TEOKEEWADI DAM IV. 24. (Til) VIL NAVIGATION WORKS (a) Length, of river where naviga- 13'5 miles tion has been made possible by the construction of the dam (6) Type of cargo transported (c) Number of passengers trans- ported annually (d) Annual income from source at item (2)and (3). («) Navigation Lock (t) Location (») Lock chamber, clear size (Hi) Lift (i) Maximum (H) Minimum (w) Estimated leakage tima VIQ. SUPPLEMENTARY INFORMATION (!) Constructional features (2) Changes introduced in the plans of the dam and in the method of carrying out the work (3) Noteworthy occurrences and acci- dents. (d) Operation of the dam (a) Regulation (6) Silting of the reservoir (t) Total silt deposited (u) Rate of silting (Hi) Density of the silt deposi- ted. (w) Rate of advancement of delta (c) Actual yield as against estimated (d) Various measurements and observations (i) Evaporation losses (n) Sweating below the dam (m) Temperature measurements, (it?) Seepage and regeneration 2*9 (c) 229,568 aero feet (i) Estimated to be 5 feet in a year approximately. (iv) Maximum 0*440 cusees with lake foU.