BA3C IV. SO. (V) Vffl. SUPPLEMENTARY ZNTORMATION (1) Constructional features (2) Changes introduced in the plans of the dam and in the method of carry* ing out the work Materials for masonry, as stone, mortar, etc. were*taken by tippers with motive power and the work was executed departmentally. Earth was carried by tippers and the work was done under piece work agencies. The composite dam between Ch. 53 and 58 was replaced by an earthen Dam, 8 feet top width and 2 to 1 earthen slopes and 1J to 1 revetment slopes. The top width of the earth backing to main dam was re hiced fro T\ 15 to 10 feet. Sanctioned proposal was for weirs 950 feet and 785 feet respectively at Left and Eight flanks discharging with a head of 5 feet. The weir at right flank was abandoned due to bad founds and 3 new weirs at left flank were built. The length of weirs built at left flank are 120 feet, 170 feet and 90 feet. The head over the crest was raised from 5 feet to 6 feet. The length of 950 feet weir was curtailed by 10 feel. The sanctioned design of both right flank and left flank sluices were changed. The ventand shutters at right flank are the same as sanc- tioned while at left flank 2 vents, 4' X 5' were provided instead of 3 vents, 4' X 5'. It was raised by one foot above the of the dam. (3) Noteworthy oeeurreatf&s &nd accidents (4) Operation of the dam :— (a) Regulation (6) Silting of the reservoir— (i) Total silt deposited (w) Bate of silting (ra) Density of &e silt deposited (0? deite