LIBRARY
OF T^JE
UNIVERSITY OF CALIFORNIA.
TABLES
FOB
u (J
OF THE
PROVIDENCE PATTERN," ETC.
BY
EDMUND B. WESTOX,
M. A.M. SOC. C. E ; M. INST. C. E.; ENGINEER IN CHARGE OF WATER DEPARTMENT, CITY ENGINEERS OFFICE, PROVIDENCE, R. I.
SECOND EDITION.
REHRINTED FROM ENGINEERING NEWS, JUNE 21 AND 28, 1890.
NEW YORK: ENGINEERING NEWS PUBLISHING CO.,
1896.
TABLES
FOR
THE "V
UNIVERSITY
IDENCE PATTERN," ETC.
BY
EDMUND B. WESTON,
M. AM. 80C. C. E.J ASSOC. M. INST. C. E.: ENGINEER IN CHARGE OF WATER DEPARTMENT, CITY ENGINEER'S OFFICE, PROVIDENCE, R. I.
MISCELLANEOUS DATA RELATING TO LAYING WATER PIPE, ETC., NOT IN- CLUDING THE COST OF THE PlPE.
Ordinary labor was considered at $1.50 per day.
Short lengths. — Total cost of laying 6-in. pipe per lin. ft. from 15 to 50 ft., including excavating and back-filling for the same; in easy digging, $0.34; in medium digging, $0.45.
Extra Excavation. — In easy digging, $0.20 percu. yd.
Rock. — Average cost of blasting rock per cu. yd., $2.00 Maximum " •' " " " 3.00
Bridges. — Cost of crossing bridges, laying pipe, boxing, etc., 12 in., $1.50 per. lin. ft.; cost of crossing bridges, laying pipe, boxing, etc. , Sin. $1.32 per lin. ft.
Kail roads. — Cost per lin. ft. of laying 374 ft. of 16-in. pipe that passed under two railroad tracks $0.50.
Work of one man. — The average proportion of work that an ordinary laborer will perform in one day, at excavating, refilling and laying pipe (not including calking, etc.), is as follows:
inch
In easy digging 21 lineal feet of 6 |
|||
" medium ' |
17.2 |
M |
* •* |
" hard |
10.3 |
«« |
« ,t |
" easy " medium ' |
19.3 13.4 |
« |
• 8 ' 12 |
" easy " medium ' |
9.0 4.4 |
7, |
' 20 ' 24 |
Average cost of excavation for a 24-io. pipe.— The average cost of excavating and back-filling in medium digging, for a line of 21-in. pipe 19,416 ft. long (the average depth of the trench being 6.60 ft. in depth), with ordinary labor at $1.50 per day, was $0.32 per cu. yd.
TABLE NO. 1.
WEIGHT OF WATER PIPES, OF THE "PROVIDENCE PATTERN.1
Length, 12ft. over all.
Nominal diameter in ins. |
Class. |
Fhick- ness of shell in ins. |
Length that pipe ( will lay. |
Depth >f bell in ins. |
Weight in pounds . |
Standard veight in ' Ibs. |
Greatest jro posed head in ft. |
|
ser run-' i ning ft. |
>er run- ^ ning ft. |
|||||||
as laid. |
of shell. |
|||||||
/ ti |
13-32 |
11.83 |
2.00 |
19.61 |
18.11 232 |
60 |
||
j |
7-i6 |
• |
20.88 |
19.37 247 |
100 |
|||
b' |
7-16 |
" |
20.88 |
19.37 247 |
140 |
|||
4 < |
1532 |
»» |
« |
22.06 |
20.61 261 |
180 |
||
1 |
£ |
15-32 |
•< |
' |
22.06 |
20.61 281 |
220 |
|
^ |
D |
15-32 |
" |
4 |
22.06 |
2061 261 |
260 |
|
ft |
7 16 |
11.83 |
2.00 |
30.25 |
28.25 i 358 |
60 |
||
f |
15-32 |
32.11 |
30.12 380 |
100 |
||||
i |
t |
" |
• ' |
33.98 |
31.99 |
402 |
140 |
|
b •< |
B |
17-32 |
,, |
44 |
33.98 35.75 |
31.99 33.81 |
402 423 |
180 220 |
I |
D |
l,-32 |
'• |
44 |
35.75 |
33.81 |
423 |
2dO |
ft |
15-32 |
11.82 |
2.15 |
42.64 |
39.93 |
504 |
60 |
|
J |
45.09 |
42.43 |
533 |
100 |
||||
^ |
17-32 |
•• |
»> |
47.63 |
44.92 |
563 |
140 |
|
8 -< |
TJ |
9 18 |
t. |
.« |
49.92 |
47.39 |
590 |
180 |
^, |
19 32 |
»» |
<• |
52.53 |
49.84 |
621 |
220 |
|
1 |
£> |
1332 |
" |
44 |
52.53 49.84 |
621 |
260 |
|
/ ft |
y |
11.81 |
2 27 |
56.13 |
52.58 |
663 |
60 |
|
i 5 |
17-32 |
59.27 |
55.70 |
700 |
100 |
|||
1 b |
9 16 |
«. |
«» |
62.31 |
58.80 |
736 |
140 |
|
10 •< « |
. W-62 |
(• |
4» |
65.37 |
61.89 |
» 772 |
180 |
|
i |
(/ |
<> |
" |
68.50 |
61.95 |
809 |
220 |
|
D |
2132 |
•« |
'4 |
71.54 |
68.00 |
845 |
260 |
|
/ ft |
17-32 |
11.83 |
2.40 |
71.19 |
66.81 |
840 |
60 |
|
( |
A |
9-16 |
" |
75.00 |
70.57 |
885 |
100 |
|
»< |
«« |
82.37 |
78.02 |
972 |
140 |
|||
12 |
12 |
21-3:' |
«* |
83.10 |
81.72 |
1,016 |
180 |
|
1 |
c |
11-16 |
it |
89 75 |
85.40 |
1,059 |
220 |
|
I, |
D |
" |
93.47 |
89.06 |
1,103 |
230 |
||
a |
19-32 |
11.78 |
2.70 |
105.31 |
93.77 |
1.240 |
60 |
|
A |
21-3^ |
115.28 |
108.76 |
1,358 |
10) |
|||
11-16 |
a |
'<• |
120.34 |
113.73 |
1,417 140 |
|||
16 •< |
B |
M |
• ' |
«• |
130.14 |
123.61 |
1,533 180 |
|
C |
13 16 |
0 |
.. |
139.96 |
133.41 |
1.648 220 |
||
! |
D |
27-3J |
44 |
" |
114.88 |
138.28 |
1,706 260 |
|
' |
ft |
2132 |
11.75 |
2.95 |
145.14 |
135. 80 |
1,706 60 |
|
f |
A |
2332 |
157.62 |
148.29 |
1,852 100 |
|||
b |
25-32 |
• |
169.98 |
160.70 |
1,998 140 |
|||
20 •< |
B |
27-32 '4 |
• |
182.38 |
173.05 |
2,143 180 |
||
I |
" |
' |
194.99 |
185.30 |
2,292 220 |
|||
v |
D 31-32 |
44 |
4 I 207.24 |
197.49 |
2,436 280 |
|||
a 2332 |
11.73 |
3.20 |
190.83 |
177.91 |
2,239 60 |
|||
f |
A |
13.18 |
213.30 |
2J0.36 |
2.502 |
100 |
||
I |
b |
" |
• ' |
228.16 |
215.24 |
2,677 |
140 |
|
24 •< |
B |
151ri |
»' |
«» |
242.97 |
230.03 |
2,850 |
180 |
i |
C \ 1 1-32 |
" |
" |
266.UO |
252.09 |
3,121 |
220 |
|
I |
D |
1 3-32 |
44 |
44 |
280.66 |
268.70 |
3,233 |
260 |
a |
13-16 |
11.70 |
3.63 |
269.66 |
250.33 |
3,155 |
60 |
|
A |
29-32 |
297.78 |
278.38 |
3,484 |
100 |
|||
1 |
1 |
« |
• < |
325.56 |
306.i'5 |
3,809 |
140 |
|
30 1 |
B |
1 1-16 |
ii |
" |
344.10 |
324.74 |
4,026 |
180 |
1 |
C |
1 3-16 |
*» |
" |
382.56 |
361.48 |
4,476 |
220 |
v |
D |
1 9-32 |
•« |
11 |
409.91 |
388.83 |
4,798 |
260 |
ft |
y |
11.67 |
4.00 |
351.41 |
323.93 |
4,101 |
60 |
|
1 |
A |
1 |
396.49 |
368.98 |
4,627 |
100 |
||
1U |
»4 |
«* |
441.13 |
413.7^ |
5,148 |
140 |
||
36 -( |
B |
18 |
*» |
" |
485.60 |
458.15 |
5,687 |
180 |
1 |
C |
1 11-32 |
" |
• ' |
522.07 |
491.27 |
6,091 |
220 |
I |
D |
1 15-32 |
" |
14 |
566.04 |
535.17 |
6,604 |
260 |
ft |
1 5 32 |
11.54 |
5;50 |
632.06 |
569.93 |
7,295 |
60 |
|
i |
A |
1 5 16 |
707.09 |
644.91 |
8.161 |
100 |
||
b |
1 15-32 |
»> |
«' |
781.60 |
719.42 |
9,0-21 |
140 |
|
48 •< |
B |
" |
'« |
855.68 |
793.49 |
9,876 |
180 |
|
C |
1 25-32 |
• « |
" |
939.20 |
867.00 |
10,840 |
220 |
|
D |
1 15-16 |
" |
1.012.33 |
940.10 |
11,684 260 |
The thickness of the cast-iron pipes given in this table were calculated by the following formulas:
For diameters greater than 36 ins., t = .00003 II D + .0125 D + .33; for di- ameters of 36 ins. and less, t =.03003 H D + .01 D + .30; t = thickness in decimals of an inch; D = diameter in inches; H = head in feet.
TABLE No. 2.
ESTIMATED AVERAGE CO IT PER LINEAL FOOT OF LAYING CLASSES A AND B, OF CAST-IRON WATER PIPE OF THE "PROVIDENCE PATTERN," AND EXCAVATING AND BACK-FILLING FOR THE SAME, IN MEDIUM DIGGING, WHEN THE MARKET VALUE OF THE PIPE, IS AT DIFFERENT RATE3 PER TON. GATES AND " SPECIALS " ARE INCLUDED, BUT NOT HYDRANTS.
Cost per Ton, and. |
DIAMETER |
OF PIPE IN INCHES. |
Cost per Ton, and |
|||||||||||
Class. |
4 |
6 |
8 |
10 12 |
18 |
20 |
24 |
30 |
36 |
48 |
Class. |
|||
A. .. |
0.425 |
0.610 |
0.783 1.008 1.245 |
1.8)9 |
2.604 |
3.502 |
4.919 |
6.360' 11.0071 ..A. |
_ |
|||||
$2d^ |
B. . |
0.410 |
0.635 |
0.848 1.079 1.377 |
2.076 2.902 3.855 |
5.500 |
7.396 12.735, . B. |
$Jo |
||||||
of / A. . . |
0.437 0 627 |
0.812 1.038 1.283 |
1.957 |
2.684 3 608 |
5.096 |
6.547 |
11.341 ..A. |
|||||||
26 \ |
B. .. |
0.452 0.653 |
0.873 1.112 .420 |
2.142 |
2.993 |
3.975 |
5.670 |
7.625 |
13.138 |
..B. |
'•O |
|||
'A. |
0 448 0.614 |
0.835 1.068 .320 |
2.015 |
2.763 |
3.714 |
5.243 |
6.734 |
11.675 |
..A. |
|||||
01 27 IB::: |
0.163 0.671 |
0.898 1.145 .463 |
2.207 |
3.085 |
4.095| 5.839 |
7.854 |
13.541 |
. B. |
27 |
|||||
'A. |
0 459 0.631 |
0.853 1.098 .353 |
2.074 |
2.843 |
3.819 5.391 |
6.921 |
12.009 |
..A. |
OP |
|||||
28 j |
B* |
0.475 0.689 |
0.923, 1.178 .506 |
2.272 |
3.176 |
4.245 6.009 |
8.082 13.944 |
..B. |
to |
|||||
A. |
0.470i 0.673 |
0.88) 1.128 .396 |
2.132 |
2.923 |
3.925J 5.538 |
7.HJ9 12.343 |
..A. |
.1(1 |
||||||
29- |
j}' |
0.436 0.707 |
0.918 |
1.211 .550 |
2.338 |
3.268 |
4.334 6.178 |
8.311 |
14.347 |
..B. |
JQf |
|||
A. :: |
0 481 |
0.535 |
0.905 |
1.153 .434 |
2.190 |
3.002 |
4.030 |
5.686 |
7 296 |
12.677 |
. A. |
|||
Oft 30 |
B. |
0.493 |
0.725- |
0 973 |
1.214 -593 |
2.403 |
3 359 |
4.454 |
6.348 |
8.540 |
14.750 |
. B. |
30 |
|
A. .. |
0.492 |
0.742 |
0.926 |
1.188 .472 |
2.248 |
3.082 |
4.136 |
5.833 |
7 483 |
13.011 |
..A. |
|||
31 |
B. .. |
0.513 0.743 |
0.938 |
1.276 .653 |
2.468 |
3.451 |
4.574 |
6.517 |
8.768 |
15.154 |
..B. |
31 |
||
A... |
0.5331 0.729 |
0.943 |
1.213 .510 |
2.307 |
3.162 |
4 241 |
5.980 |
7.671 13.345 |
..A. |
oo |
||||
32 |
B. .. |
0.521 0.761 |
1.023 |
1.309 .679 |
2.534 |
3.542 |
4.693 |
6.686 |
8.997 15.557 |
..B. |
61 |
|||
A... |
0.514 |
0.748 |
0.971 |
1.243 .548 |
2.365 |
3 2tl |
4.347 |
6.128 |
7 858 13.679 |
.A. |
oo |
|||
33 |
B. .. |
0.535 |
0.779 |
4.043 |
1.1342' .722 |
2.599 |
3.634 |
4.813 |
6.856 |
9.226 15.S60 |
. B. |
66 |
||
A. .. |
0.525 |
0.762 |
0.934 |
1.273 .536 |
2.423 |
3.321 |
4 453 6.275 |
8.045 14.013 |
.A. |
'.» i |
||||
31^ |
0.544 |
0.797 |
1 073 |
1.375 765 |
2 664 |
3 726 |
4.933 7.025 |
9.454 I«.c63 |
..B. |
o4 |
||||
A. : . |
0.553 |
0.77) |
1.017 |
1.308 .621 |
2.481 |
3 400 |
4.558 |
6 423 |
8 232! 14.347 |
O" |
||||
35 |
B. .. |
0.538 |
0 815 |
1.093 |
1.408 .809 |
2.730 |
3.817 |
5.052 |
7.1 5 |
9.683 16 766 |
'.'.B! |
OJ |
||
op |
A. |
0.547 |
0.793 |
1.039 1.338! .662 |
2.540 |
3.480 |
4 664 |
6.570 |
8.4*0 14.681 |
. A. |
Of! |
|||
36 |
B. .. |
0.5)3 |
0 835 |
1.124; 1.440 .852 |
2.795 |
3.909 |
5.172 |
7 364 |
9.9,-2 17.169 |
..B. |
BO |
|||
OT |
A. .. |
0.553 |
0.813 |
1.032 |
1.383 .699 |
2 598 |
3.560 |
4.769 |
6 717 |
8.607 |
15 015 |
.A. |
O>7 |
|
37 |
B. . |
0.579 |
0.851 |
1.14.) |
1.473 895 |
2.860 |
4.000 |
5.292 |
7.534 |
10.141 |
17.572 |
B. |
61 |
|
A. .. |
0.570 0.83) |
1.085 |
1.3)81 .737 2.653 |
3.639 |
4.875 |
6-865 |
8 794 |
15.349 |
..A. |
no |
||||
o3 |
B. .. |
0.591 |
0 8ii) |
1.1711 1.503 |
.933 |
2.926 |
4.092 |
5 412 |
7.703 |
10.369 |
17.S75 ..B. |
OO |
||
A... |
0.581 |
0.847 |
1 133 1.427 |
.775 |
2 714 |
3.719 |
4.981 |
7.012 |
8.981 15.083 |
A. |
on |
|||
o3 |
B. .. |
0.602 |
0.857 |
1.199 |
1.533 |
1.931 |
2.991 |
4.183 |
5.53L |
7.873 |
10.5981 18.o79 |
..B. |
3v |
|
A... |
1.582 |
0.861 |
1.13) |
1.457 |
1.813J 2.773 |
3.798 |
5.086 |
7 160 |
9.169 16.017 |
..A. |
40 |
|||
4J |
B. .. |
0.644 |
0.935 |
1.224 |
1.572 |
2.025 |
3.056 |
4.275 |
5.651 |
8.042 |
10.8271 18.782 |
..B. |
4U |
|
11 |
A... |
0.605 |
0.831 |
1.155 |
1.487 |
1.851 |
2.831 |
3.878 |
5.192 |
7.307 |
9.3561 16.351 |
..A. |
41 |
|
41 |
1 B. |
0.625 |
0.923 |
1.249 |
1.605 |
2.068 |
3.122 |
4.366 |
5 771 |
8.211 |
11.055 19.185 |
..B. |
4 L |
|
19 J |
fA... |
0.614 |
0 893 |
4.173 |
1.547 |
1.839 |
2.839 |
3.958 |
5.297 |
7.454 |
9.543 16 685 |
..A. |
19 |
|
42 |
B. .. |
0.657 |
0.941 |
1.271 |
1.637 |
2.111 |
3.187 |
.458 |
5.890 8.1:81 |
11.284 |
19 588 |
..B. |
4- |
|
10 ( A. . . |
0.62. |
0.915! 1.193 |
1.547 |
1.927 |
2.947 |
.037 |
5403 7. '02 |
9.731 |
17 (19 |
..A. |
._ |
|||
43 |
L B. . . |
0.649 |
0 959 |
1.293 |
1.670 |
2.14 |
3.252 |
.549 |
6.010 8.550 |
11 513 |
19.S91 |
..B. |
4o |
|
, t |
A. . |
0.636 |
0.932 |
1.965 |
3.003 |
.117 |
5.503J 7.749 |
9.918 |
17.353 |
. A. |
11 |
|||
44 |
B, |
0.630! 0.977 |
024 |
l'.7d3 |
2.197 |
3.318 |
.641 |
6.130 8.72011.741 |
20.S94 |
..B. |
44 |
|||
0.647 |
0.949 |
1.244 |
1.637 |
2.003 |
3.064 |
.137 |
5.614 7.896 |
10.105 |
17.687 |
..A. |
A £ |
|||
45 |
B* |
0.872 |
0.995 |
1.349 |
1.733 |
2.241 |
3.383 |
.732 |
6 249 |
8.88911-870 |
20 797 |
. B. |
40 |
|
j/» |
f A'. ' : |
0.658 |
0.933 |
1 237 |
1.657 |
2.010 |
3 122 |
4.276 |
5 720 |
8 044 |
10 292 |
18 021 |
..A. |
|
46 |
IB. |
0 684| 1.013 |
1.374 |
1.769 |
2.234 |
3 448 |
4.824 |
6 369 9 059 |
12 199 |
'/1. 2(10 |
..B. |
46 |
||
A. |
0.639 0.983 |
1.637 |
2.078 |
3 180 |
4.356 |
5 82* 8 191 |
10 480 |
18 355 |
..A |
Art |
||||
47 |
IB. .. |
0.695 |
1.031 |
1 393 |
1.8)2 |
2.327 |
3 514 |
4.915 |
6 489 9.228 12 428 |
21 604 |
..B. |
4/ |
||
gm |
A. .. |
0.63) 1.0 0 |
1.312 |
1.697 |
2 116 |
3. 39 |
4 435 |
5 931 8 339 |
10 667 |
I860, A. |
48 |
|||
48 |
B. |
0.707 |
1 0'<9 |
1.424 |
1.834 |
2.370 |
3.579 |
5 007 |
(> 609 9.398 |
12 656 |
22 007 |
..B. |
4o |
|
A... |
0 691 1.017 |
1 1.335 |
1.727 |
2.154 |
3.297 |
4.515 |
6 036 i 8 486 |
10 854 |
19 024 |
4Q |
||||
49 |
B. . |
0 718! 1 057 |
1.449 |
1.867 |
2.413 |
3.644 |
5 0)8 |
6 7281 9 567 |
12.885 |
22 410 ..B. |
±v |
|||
dri |
A... |
0 702 1.034 |
1 358 1.757 |
2.192 |
3.355 |
4 595 |
6 142! 8 65311 041 |
19 358 . A. |
CA |
|||||
OU |
B. .. |
0.730 |
1.085 |
1.475 1.90J |
2 456 |
3 710 |
5 DC |
G 843 9 737 |
13 114 |
22 813 |
. B. |
on |
The thickness of the Class A pipe was based upon a static pressure of 10(> ft., and the Class B pipe upon a static pressure of 180 ft.
The figures include the cost of pipe, gates an I " specials," the cost of cart- ing, laying and setting, and excavating and back-filling for the same, and all other expenses generally incurred in ordinary water pipe laying, with the exception of the cost of hydrants.
The cost of "specials" was based upon $0.025 per pound, with pipe at $30 per ton, the cost of air-cocks (used only with pipes having a diameter larger than 20 in.), at $10 each, and the cost of the gates the same as given in Table No. 3.
Ordinary labor was considered at $1.50 per day.
Depth of Pipe.— The depth of the axis of the pipe below the surf ace of the ground has been considered in all cases as 4.67 ft.
I!
s 15 a s &
32 8 22 S3
B SZ S
1 8
8 S.
gs s s 3
g3j « o ^
- -
a s s s- s
I 1 1 1
^-o^is I *j 2 S S 22 S
I i
S 2
£ S S S
o
= ! § o i u -SH 5 s
I H
11
8 .* . -
S S § S
i-l QC O
« - |
XX^-;X^^rfo(=<=(=eSOOC5C;300000f-l— I'-K-'rH^Hr-KMNCO
i; * O I
,c^
a-MdMd;N|:E;:S;:a;:S;:a;:S;
ST-J J-2irt hl»-«T3 :»,"TTJ t^-TT: ^S'O ^^^ t^S^ ^ST3. >>S'?.
§ lg
^ 03 '3
O j£,
M «-
i if
'•as s
> p ••c 2
45 fc*^
P eS-C
'El
OB 5
ill
*-> *S ^
P &JLOD
^ ^ p, g a
§1! 12
R^ P flj ^-02
•"•^ as JB
O «D «D £t
P4
O
x ee-
I !
-M O
S 'i
ZrS'O S-*3 S -^
o^^.88*5-
^
TABLE NO. 4.
WEIGHT AND COST OF SPECIAL CASTINGS, ETC.
To be used in connection with Table No 3 when greater accuracy with regard to •" specials " is required.
Nature of " special" Xin inches). |
Length that " special" will lay. |
Weight in pounds. |
Cost at $ .03 per pound. |
Nature of "special" ;(in inches). |
Length that "special" will lay. |
Weight in pounds. |
Cost at $.03 per pound. |
Branches. |
Feet. |
$ |
Reducers. |
Feet. |
$ |
||
6X 4 6X6 6 X 6 X 6 6X8 6 X 6 X 8 8 X 4 8X6 3 x e 8X8X8 8X8X6 8X6X6 10 X 6 10 X 6 X 6 10 X 8 X 6 10 X 8 10 X 8 X 8 12 X 6 12 X 6 X 6 12 X 8 X 6 12 X 8 12 X 8 X 8 12 X 10 12 X 12 16 X 6 16 X 6 X G 16 X 8 X 6 16 X 8 16 X 8 X 8 16 X 10 16 X 12 16 X 12 X 12 16 X 16 20 X 6 20 X 6 X 6 20 X 8 20 X 8 X 6 20 y 10 .20 X 10 X 8 20 X 12 20 X 16 24 X 6 24 X 6 X 6 24 X 8 24 X 8 X 8 24 X 10 24 X 12 24 X 16 24 X24 30 X 6 SOX 8 30X 8 X 6 -30 X 8 X 8 30 x 10 30 X 12 30 X 12 X 8 30 X 16 30 X 20 30X24 30 X 24 X 12 30X30 Blow offs.. |
3.22 3.22 3 22 3.22 3 22 3.20 3.20 3.o6 3 20 3.20 3.20 3 36 3.36 3.36 3.36 3.36 3.22 3.22 3.22 3.^2 3.22 3.39 3.22 3.03 3.03 3.03 3.20 3.20 3.20 3.20 3.20 3.20 '. .84 .84 .84 .84 .84 .84 .84 .84 .53 .53 .53 .53 .53 ' .53 .53 .53 5.04 5.04 5.04 5.04 5.04 5.04 5.04 5.04 5.04 5.04 5.04 5.04 |
190 190 235 218 265 239 243 287 362 315 234 353 360 426 356 446 394 469 581 428 481 535 453 5»8 660 661 641 733 638 627 800 84o 1123 1202 1183 • 1190 1112 1250 1233 1383 1082 1453 1345 1540 1463 1408 1537 1656 1955 1980 2150 2145 2078 2048 2210 2290 2288 2560 2695 2478 |
5.70 5.70 7.05 6.54 7.95 7 17 7.29 8.61 10.86 9.45 8.52 10.59 10.80 12.78 10.68 13.38 11.82 14.07 17.43 12.84 14.43 16.05 13.59 17.64 19.80 19.83 19.23 21.99 19 14 18.31 24.00 23.35 33.69 36.06 35.49 35.70 33.36 37.50 36.99 41.49 32.46 43.59 40.35 46.20 43.89 42.24 46.11 49.68 53.65 59.40 64.50 64.35 62.34 61.44 66 30 68.70 68.64 71.80 80 85 74.34 |
6 to 4 8 to 6 10 to 8 12 to 8 16 to 12 20 to 16 24 to 12 30 to 24 Turns. 4—1-16 4-*6 Sie 6— y* 8-1-16 8-K 8-V4 10-1-16 io-4$ 12- K Bevel hubs 6 8 10 12 Spig't caps 6 8 10 12 16 Bell caps. 6 8 10 12 16 20 24 30 Plugs. 6 8 12 Sleeves. 4 6 8 10 12 16 20 24 30 36 Gate boxes Large ' " rings. ' cov'rs Small box (6") ' cover (6 ') " box (8") 1 cover (8") |
1 63 1.95 1.65 2.61 2.70 4.17 4.59 3.04 1.55 1.33 1.89 1.58 1.42 1.38 3.57 3 32 2.25 3.48 3.23 3.22 1 75 1.74 3.94 1.72 |
65 105 148 205 338 863 923 1158 48 47 61 90 92 109 233 239 136 291 296 443 90 130 316 219 39 57 78 110 155 41 63 78 118 160 220 342 548 10 15 27 67 38 56 80 107 131 207 319 457 637 907 689 142 83 137 19 160 38 |
1 95 3.15 4 44 6.15 10.14 25.89 27.69 34.74 1.44 1.41 1.83 2.70 2.76 3.27 6.99 7.17 4.08 8.73 8.88 13.28 2.78 3.90 9.48 6.57 1.17 1.71 2.34 3.36 4.65 1.23 1.89 2.34 3.54 4.b0 6.60 10.26 16.44 .30 .45 .81 2.01 1.14 1.68 2.40 3.21 3.93 6.21 9.57 13. 7 J 19.11 27.21 20.67 4.26 2 49 4.11 .57 4.80 1.14 |
|
|||||||
|
|||||||
|
|||||||
|
|||||||
24 X 6 30 X 8 Manholes.. . . |
|||||||
4.53 5.04 |
1377 2055 |
41.31 61.65 |
|||||
21 30 36 Hydrant |
4.53 5.04 4.00 |
1625 2020 2015 1010 491 102 |
48.75 60.60 60.45 |
||||
Hydrant box Frame and cover |
14.73 3.06 |
||||||
|
|||||||
TABLE NO. 5.
COST IN DETAIL OF LAYING WATER PIPE OF THE "PROVIDENCE PATTERN/' INCLUDING EXCAVATING AND BACK-FILLING FOR THE SAME.
Excavation (Easy Digging).
Items. |
Diameter in inches. |
Average prices of labor, etc. |
||||||
4 |
G |
8 |
10 .0707 .0219 .0216 .0 69 .0111 .0553 .0136 .0275 |
12 |
13 |
20 |
24 |
|
1 Trenching 2 Laying 3 Foreman 4 Tools, etc., etc 5 Calking 6 Lead 7 Teams . . ... |
.0422 .0129 .0130 .0041 .0106 .0224 .0070 .0078 |
.0518 .0162 .0158 .0050 .0107 .0320 .0090 .0149 |
.0611 .0191 .0188 .0059 .0108 .0431 .0115 .0208 |
.0798 .0249 .0244 .0078 .0118 .0683 .0160 .0346 .2676 |
.1445 .0370 .0303 .0134 .0159 .0950 .0203 .0518 .4082 |
.2088 .0497 .0360 .0191 .0301 .1203 .0216 .0746 |
$1.50 1.50 3.00 1.1% of 1 » nd 2. $2.25 5c. per pound. $2.25 $1 per ton. |
|
8 Carting |
||||||||
Total . |
||||||||
.1200 |
.1554 |
.1911 |
.2286 |
.5602 |
Cost of Easy Digging reduced to $1 and Ic.
Trenching |
0281 |
.0345 |
.0407 |
.047l! |
.0532! |
.09631 |
.1392 ... |
$1.00 |
Laying |
.0086 |
.0108 |
.0127 |
.01461 |
.0166 |
.0^47 ! |
.0331 |
1.00 |
Foreman |
.0043 |
.0053 |
.0063 |
.00721 |
.0081 |
.0101 |
.0120 |
1.00 |
Tools, etc., etc |
.0006 |
0007 |
.0008 |
.OOU9 |
.0011 |
.0018 |
.0026J |
w |
Calking . |
.0047 |
0047 |
.0048 |
0049 |
.0052 |
.0071 |
01341 |
$1.00 |
Lead |
0045 |
0064 |
0086 |
0111 |
0137 |
0190 |
0241 |
.01 |
Teams . ., |
.0031 |
.0040 |
.(051 |
.0060 |
.0071 |
.0090, |
.0096 |
1.00 |
Cartina: |
.0078 |
.0149 |
.0208 |
.0275| |
.0346| |
.0518, |
.0746i |
1.00 |
Excavation (Medium Digging}
1 Trenching |
0597 |
0697 |
0790 |
0883 |
0974 |
1700 |
2403 |
3091 ' $1 50 |
2 Laying |
.0189 |
.0220 |
0249 |
0307 |
.0440 |
.0577 |
.06391 1.50 |
|
3 Foreman 4 Tools, etc., etc 5 Calking 6 Lead . . . |
.0180 .0056 .0106 0224 |
.0206 .0065 .0107 .0320 |
.0234 .0075 .0108 0431 |
.0265 .0084 .0111 0553 |
.0294 .0093 .0118 0683 |
.0350 0154 .0159 .0950 |
.0373 .0214 .0301 .1203 |
039 jj 3.00 .0602 7.2^ of land 2* .0757 $2.25 .1600 5c. per pound. |
7 Teams 8 Carting ... ... |
.0070 0078 |
.0090 0149 |
.0115 0208 |
.0136 0275 |
.0160 .0346 |
.0203 0518 |
.0216 .0746 |
0228J $2.25 .1317' $1 per ton. |
Total |
1500 |
1854 |
2210 |
.2586 |
2975 |
4474 |
6030 |
.sero |
1 |
Cost of Medium Digging reduced to $1 and Ic,
Trenching . . |
.0331 |
.0465 |
0527 |
.0589 |
.06941 .1133 |
.1600' .2061 |
$1.00 |
Lay-in01 |
0126 |
0147 |
0166 |
0186 |
0205' 0293 |
0385 0426 |
1.00 |
foreman Tools, etc., etc Calking ., |
.0060 .0008 0047 |
.0069 .0009 .0047 |
.0078 .0010 0048 |
.0088 .0012 .0:49 |
.0098 .0117 .00131 .0021 .00521 .0071 |
.01241 .0132 .0030' .0037 .0134J .0336 |
1.00 w* $1.00 |
Lead . . |
0045 |
0064 |
0086 |
0111 |
0137 0190 |
0241 0320 |
.01 |
Teams |
0031 |
.0040 |
0051 |
.0060 |
.007H .0090 |
.0096 .0101 |
100 |
Carting |
0078 |
0149 |
0208 |
0275 |
0346 0518 |
0746 .1317 |
l.CO |
i |
Excavation (Hard Digging).
1 Trenching |
0860 |
0959 |
1053 |
1147 |
1300 |
2261 |
3264 |
$1 50 |
|
2 Laying , |
0271 |
0303 |
C333 |
0362 |
0411 |
05'-50 |
0669 |
1 50 |
|
3 Foreman 4 Tools etc., etc |
.0260 0081 |
.0286 0093 |
.0314 0099 |
.0343 0109 |
.0372 0118 |
.0428 0201 |
.0452 0283 |
B.OO 7 2% of 1 and 2 |
|
5 Calking 6 Lead |
.0106 0224 |
.0107 0320 |
.0108 0431 |
.0111 0553 |
.0118 0683 |
.0159 0950 |
.0301 1203 |
$2.25 |
|
7 Teams |
0070 |
0090 |
0115 |
0136 |
0160 |
0203 |
i 216 |
' $2 25 |
|
8 Carting |
.0078 |
.0149 |
.0208 |
.0275 |
.0346 |
.0513 |
.0746 |
$1 per ton. |
|
Total |
.1950 |
.2304 |
.2661 |
.3036 |
.3508 |
.5250 |
.7134 |
|
Cost of Hard Digging reduced to $1 and Ic.
Trenching |
.0573 |
Laying |
0181 |
Foreman |
.0087 |
Tools, etc., etc |
.0011 |
Calking . . . |
0047 |
Lead ... Teams . . . |
.0045 0031 |
Carting |
.0078 |
0202 .0095 .0013
0047 .0.064 .0040 .0149
.0702 .0222 0105 .0014
.0048 .0086 .0051 0208
.0765 .0241 0114 .0015
.0867 .0274 .0124 .0016
.0049! .0052
.01111 .0137
.0060, .0071
.0275 .0346
.21761..
.1507
.0353 0446J.
.0143 .0151'
.(039
.00711 .0134 ..
.0518 .0746!..
$100 1.00 1.00
w
$1.00
.01
1.00
1.00
The percentage for 24 inch includes blocks and wedges, and is 16-
9
This table, No. 5, contains the items in detail from which the cost of the labor of laying water pipe, from 4 to 24 in. in diameter, given in Table No. 3, were obtained.
The word "Trenching" is used for excavating and back-filling.
Throughout these tables Easy Digging is intended to correspond to exca- vation in sand, etc.; Medium Digging to excavation in sand and gravel, etc.; and Hard Digging to excavation in hard or moist clay, etc. The figures relat ing to medium excavation are probably the most reliable for pipes that have a diameter greater than 8 ins.
The prices given in any of the tables do not include the cost of engineering and inspection.
SUPPLEMENT TO TABLES NOS. 2, 3, AND 5.
The following table gives the items of the actual cost of the labor of laying water pipe ana excavating and back-filling for ihe same, upon which Tables Nos. 2, 3 and 5 were based, with, the exception of the cost of carting pipe, which was considered at $1.00 per ton. The table also shows a comparison of the items of actual cost with the amountx that correspond to them in Tables Nos. 2, 3 and 5. The tabl" was computed from rec- ords kept in Providence, with the exception of the data that refers to the 48-twc/i pipe, which was obtained elsewhere.
Length of pipe used in feet. |
Excavating, back-filling and laying. |
3. Calking. |
4. Teaming |
Total of 1, *,3 and 4. |
Total corre- sponding to 1, L>, 3 and 4, from Table No, 5, etc. |
|||
Exca- vating, etc. |
Laying, etc. |
Total of i and 2. |
Total corre- sponding to 1 and 2 from Table No. 5, etc. |
|||||
4 inch. Medium Digging. |
||||||||
1,214 Ave., etc.. |
$.09460 |
$.09660 |
$.01300 |
$.00650 |
||||
$.09460 |
$.09660 |
$.01300 |
$.00650 |
$.11410 |
$.11420 |
|||
ti-inch, Easy Digging. |
||||||||
480 422 38U 533 201 378 401 416 364 181 320 711 545 1,501 228 265 485 266 442 Ave., etc.. |
$.06781 .10147 .06374 .07576 ' .09127 .06874 06039 .07416 .05818 .08057 .05778 .05108 .05771 .07488 .07017 ,06566 ,05567 .05677 .06493 |
$.00959 .02177 .02253 .01444 .01975 .02063 01376 ,01696 .01922 .1.1362 .01906 .01293 .01686 .02037 .01211 .01389 .01136 .01038 .01040 |
$.00338 .01173 .0,067 .01098 .00564 .01518 .00899 .01083 .OOJ25 .01373 .01053 .(,0854 .00950 .00480 .0(294 .00426 .00324 .00338 .00355 |
$.01171 .01173 .01067 .01098 .01237 .01518 .01011 .01083 .00928 .01373 .O10.i6 .00886 .00872 .00524 .00496 .00423 .00326 .00338 .00358 |
||||
|
||||||||
I |
||||||||
|
||||||||
1 |
||||||||
$.06825 |
$.01577 |
$.08402 |
$.08380 |
$.00827 |
$.00891 |
$.10120 | $.10350 |
||
6-inch, Medium, Digging. |
||||||||
526 666 242 7^2 727 144 318 164 428 1,039 138 597 129 131 311 273 406 Ave., etc.. |
$.09366 .(18989 .114996 .07204 .10241 .12185 .14775 .06288 .06301 .09476 .06594 .05717 .1031i> .08992 .07180 .143nO .087ul |
$.02319 .01477 .01901 .01883 .01264 .04756 .01448 .01413 .01998 .01625 .02(538 .01540 .02155 .01637 .01479 .02817 .02227 |
$.01198 .01117 .00930 .00922 .01362 .02027 .01416 .00060 ,01157 .01474 .01138 .01131 .01566 .01055 .00868 .015(51 .00999 |
$.01198 .01)981 .01115 .01014 .01208 .02034 ,0(1919 .009(56 .01157 .01278 .01145 .01040 .01217 .01056 .00868 .01399 .00777 $.01140 |
||||
$.08918 |
$.02034 |
$.10952 |
$.11230 |
$.01333 |
$.13425 |
$.13200 |
10
Supplement to Tables Nos. 2, 3, and 5. (Continued.)
Excavating, back-filling and laying. |
||||||||
Total |
||||||||
corre- |
||||||||
Length of |
Total corre- |
sponding to 1, 2, 3 |
||||||
pipe used in feet. |
14 Exca- vating, |
2.1 Laying, etc |
Total of 1 and 2. |
sponding to 1 and 2 from |
8 Calking. |
4. Teaming |
Total of 1, 2,3 and 4. |
and 4, from Table |
etc. |
Table |
No. 5, |
||||||
Is o.5, |
etc. |
|||||||
etc. |
6-inch, Hard Digging.
265 |
$.08276 |
$.02301 |
$.01275 |
$.01698 |
||||
307 |
.14378 |
.01645 |
01098 |
01101 |
||||
Ave., etc.. |
$.11327 |
$.01973 |
$.13300 |
$.15480 |
$.01186 |
$.01399 |
$.15885 |
$.17450 |
8-inch, Medium Digging.
496 |
$.08794 |
$.02458 |
$.00907 |
$.00544 |
||||
3,743 |
.06898 |
.01654 |
.00541 |
.00421 |
||||
5*9 |
.07656 |
.01272 |
.00425 |
|||||
82 |
.OJ756 |
.01122 |
.01098 |
|||||
Ave., etc.. |
$.08276 |
$.01626 |
$.09902 |
$.12730 |
$.00743 |
$.00483 |
$.11130 |
$.14960 |
S-inch, Hard Digging.
157 |
$.12540 |
$.02924 |
$.02147 |
$.01433 |
||||
Ave., etc |
$.12540 |
$.02924 |
$.15464 |
$.17000 |
$.02147 |
$.01433 |
$.19044 |
$.19230 |
1'2-inch, Easy Digging.
1,255 |
$.09207 |
$.02388 |
$.01147 |
$.00609 |
||||
Ave., etc |
$.09207 |
$.02388 |
$.11595 |
$.12910 |
$.01147 |
$.00609 |
$.13351 |
$.15690 |
12-inch, Medium Digging.
1,132 |
$.09627 |
$.04595 |
$.11220 |
$.01193 |
$.00569 |
|||
2 161 |
.12400 |
.01030 |
||||||
4283 |
.10070 |
01650 |
|
|||||
1 785 |
.13350 |
|||||||
589 |
.16930 |
0°10) |
||||||
Ave etc |
$.13394 |
$.15750 |
$.01193 |
$.01337 |
$ 15920 |
$ 18530 |
||
16-inch, Medium Digging.
374 |
$ 22818 |
$.04904 |
$.27720 |
$.02107 |
$.02045 |
|||
2,839 |
.25830 |
.01820 |
||||||
Ave., etc.. |
|
|
$.-6780 |
$.24900 |
$.02107 |
$.01933 |
$.30820 |
$.28520 |
20-inch, Easy Digging.
242 |
$.15876 |
$.04417 |
$.02508 |
$.02513 |
||||
1 450 |
.15820 |
.08383 |
.03010 |
.04310 |
||||
Ave., etc.. |
$.15848 |
$.05400 |
$.21250 |
$.29450 |
$.02759 |
$.03411 |
$.27420 |
$.34620 |
24-mc/i, Medium Digging. *(
19 416 |
$ 32820 |
$.07310 |
$.07570 |
$.02280 |
||||
Ave, etc.. |
$.32820 |
$.07310 |
$.40130 |
$.41260 |
$.07570 |
$ 02280 |
$.49980 |
$.51110 |
11
Supplement to Tables Nos. 2, 3, and 5. (Continued.)
Excavating, back-filling and laying |
1 |
|||||||
Total |
||||||||
corre- |
||||||||
Total |
sponding |
|||||||
Length of pipe used in feer, |
Exca- vating, etc. |
r 24 Laying, etc. |
Total of 1 and 2. |
corre- sponding to 1 and 2 from Table |
3. Calking. |
4. Teaming |
Total of 1, 2,3 and!. |
tol. 2, 3 and 4, from Table No. 5, |
No. 5, |
etc. |
|||||||
etc. |
21-inch, Medium Digg'fig (2.) |
|||||||
19,416 Ave., etc.. |
$.38940 |
$.08180 |
$.07570 $.07570 |
$.02230 |
i |
||
^.36940 |
$.08180 |
$.45120 |
|
$.02280 |
$.54970 j |
||
30-inch, Easy Digging. |
||||||||
561 Ave etc |
$.37000 |
$.08420 $.08420 |
||||||
$.37000 |
||||||||
48-inch, Medium Digging.
$1.950t $1.650t
t Including foreman.
* (1) Reduced by proportion to correspond to a depth of 4.67, from (2) 5.43 feet the ac- tual depth.
t These figures include calking. The $1.95 is based upon ordinary labor at $1.75 per day, and $2. 00 per day for laying. The $1.65 is based upon labor at $1.50 per day, and was reduced by proportion from $1.95, assuming that the number of layers \, as 1-10 the number of other laborers.
TABLE NO. 6.
COMPARISON BETWEEN THE TOTAL COST PER LINEAL FOOT OF THE LABOR OF LAYING WATER PIPE AND EXCAVATING AND BACK-FILLING FOR THE SAME, ETC., GIVEN IN THE PRECEDING TABLES, FOR MEDIUM DIGGING, AND WHAT THE TOTAL COST WOULD BE IF THE TRENCHING, ETC., HAD BEEN BASED UPON $0.30 PER CUBIC YARD INSTEAD OF THE AMOUNTS CHARGED TO TRENCHING, ETC., IN TABLE NO. 5. THE COST OF LAYING, ETC., HAS BEEN CONSIDERED THE SAME IN BCTH CASES.
SI-
~~ ~ -~
At $0.30 per cubic yard. |
From Table No. 5. |
8J5.5 fail* SlfeS Q |
||||
Laying, etc. |
Trenching, etc. |
Total. |
Laying, etc. |
Trenching, etc. |
Total. |
|
$.0676 .0886 .1099 .1334 .1583 .2235 .3)35 .4876 |
$.1382 .1506 ,16o2 1758 .1890 .2160 .2447 .2742 |
$.2058 .2392 .2731 .3092 .3474 .4395 .5482 .7618 |
$ 0676 .0886 .1099 .1334 .1583 .2235 .3035 »4876 |
$.0833 .0968 .1111 .1252 .1392 .2239 3154 .3754 |
$.1509 .18£4 .2210 .2586 .2975 .4474 .6189 8630 |
+$.0549 + .0538 4- .0521 •f .0506 4- .0498 — .0079 - .0707 - .1012 |
In this table, under the division headed "At $0.30 per Cubic Yard," the cost per lineal foot of Trenching, etc., is based upon the excavation at $0.30 per cubic yard, measured in the trench, instead of the actual cost, and takes the place of the amounts charged in Table No. 5, for medium digging, to trench- ing, teaming, and % the amount charged to foreman and tools, etc. (ex- clusive of the cost of blocks and wedges, which are included in the cost of Tools, etc., for 24-inch pipe, in Table No. 5). The figures relating to laying, etc., are the same as those charged in Table No. 5 for medium digging, to laying, calking, lead, carting, and % the amount charged to foreman and tools, etc. (exclusive of the cost of blocks and wedges, which are included in the cost of tools, etc., for 24-inch pipe, in Table No. 5). In each instance, in calculating the cubic contents of the trench, the width was considered as 2 feet more than the diameter of the pipe and % of a foot deeper than the water line of the same.
12 TABLE NO. 7.
AMOUNT PER LINEAL FOOT TO BE ADDED TO THE FIGURES GIVEN IN THE PRECEDING TABLES FOR RELAYING PAVING, ETC., IN CASES WHEN THE STREETS ARE PAVED BE- FORE THE WATER PIPE IS LAID.
Diameter of pipe in |
|||||||||||
inches |
4 |
6 |
8 |
10 |
12 |
16 |
20 |
24 |
30 |
36 |
48 |
Cobble stones Granite blocks laid |
$0.12 |
$0.12 |
$0.12 |
$0.13 |
$0.13 |
$0.14 |
$0.16 |
$0.17 |
$0.18 |
$0.20 |
$0.23 |
upon a sand founda- |
|||||||||||
tion |
0.18 |
0.18 |
0.18 |
0.19 |
0.20 |
0.22 |
0.24 |
0.25 |
0.27 |
0.30 |
0.35 |
Granite blocks, con- |
|||||||||||
crete foundation, |
• |
||||||||||
joints filled with pea gravel and asphal- |
, |
||||||||||
tum |
0.93 |
0.96 |
1.C1 |
1.05 |
1.09 |
1.18 |
1.32 |
.1.37 |
1 50 |
1.64 |
;1-M |
The cost of a square yard of broken stone £ ins. thicfc, put properly in place in a street, would be about $0.40.
The figures in this table were based upon a trench 3 ft. wider at the surface of the ground than the diameter of the pipe, in order to allow for caving, etc.
The cobble stone paving was considered at $ 0.30 per square yard, the granite blocks laid upon sand foundation at $0.45 per square yard, and the granite blocks laid upon a concrete foundation, etc., at $3.46 per square yard. The granite blocks were estimated to lay from 24 to 27 per square yard.
TABLE NO. 8.
AVERAGE COST OF LAYING LEAD SERVICE PIPE, INCLUDING EXCAVATING AND BACK- FILLING FOR THE SAME.
Tap and stop.
Pipe per lineal foot.
Tap, stop, |
"Wpicrht |
Laying, etc., pil |
3tc., including )e. |
||
tapping. |
Lead pipe. |
Tin-lined lead pipe. |
|||
%inch. V-2 "t I4 " |
$6.00 6.23 6.81 8.67 10.71 |
}£ inch. 1 4 ' \y\ • ite • |
3.00 pounds. 4.00 4.75 6.00 9.00 10.00 |
$0.34 0.40 0.45 0.52 0.70 0.76 |
$0.52 0.64 0.73 r.88 1.24 1.36 |
The labor of excavating, back-filling and laying, etc., was considered in all cases for lead pipe at $0.16 per foot. The price used for lead pipe was $0.06 per pound, and the price for tin-lined lead pipe $0.12 per pound.
ENGINEERING NEWS
AND AHERICAN RAILWAY JOURNAL
Published every Thursday at Tribune Building, New York. 23d Year. Five Dollars.
Engineering News contains each week twenty- four pages of valuable reading matter, cover- ing the entire field of engineering science in both this and foreign countries. Railways, water- works, bridges, manufacturing and technical, con- tracting, mechanical and electrical industries are fully reported, and detailed working drawings and full descriptions are given of all the more im- portant and note worthy structures and enterprises. Record is kept of the proceedings of the engi- neering and technical societies and clubs, and the latest technical books and magazines are fully re- viewed and discussed. The correspondence col- umns contain communications from engineers, contractors and others, regarding matters of cur- rent interest.
The advertising columns and those of "Con- struction News" constitute the most complete rec- ord of the current contract work of engineering in the United States that is obtainable. Together they make a very complete index of new rail- roads, new water-works, sewer building, street paving, highways, river and harbor improve- ment, bridge construction, public buildings erect- ed, tunneling, pile driving, dredging, blasting op- erations, experiments and actual work in concrete and cement, electricity and gas, artesian wells, canals, everything, in fact, having any relation to public work, or the business of civil engineering and contracting, while from the abstracts of bids published from week to week, the prices of labor, materials and other elements of cost of engineer- ing work in different parts of the country are ob- tainable.
A PARTIAL LIST
OF THE LATEST AND MOST
POPULAR ENGINEERING PUBLICATIONS
FOR SALE BY
THE ENGINEERING NEWS PUBLISHING CO., TRIBUNE BUILDING. NEW YORK.
BAKER. Surveying instruments $3.00
BAKER. Masonry Construction 5.00
BAUMEISTER. Cleaning and Sewerage of Cities,
2d Ed 2.50
BARSTOW. Cost of Laying Water Pipe 10
BERG. Buildings and Structures of American Rail- roads 7.50
BLACK. Public Works of the U. S 5.00
BOUSCAREN. Specifications for Highway Bridges
and Viaducts of Iron and Steel 25
BOUSCAREN. Specifications for Railroad Bridges
and Viaducts of Iron and Steel 25
BOVEY. Hydraulics, A Treatise on 4.00
BUCHANAN. Tables of Squares of Feet and Inches. 2.00
BURKE. Brick for Street Pavements 50
BYRNES. Highway Construction 5.00
CHAMBERS. Mathematical Tables . . 1.75
CHURCH. Mechanics of Engineering G.OO
CLOUGH. What an Engineer Should Know About
Electricity 50
COOPER. Specifications of Iron and Steel Highway
Bridges and Viaducts, 1890, Last Ed 25
COOPER. Specifications of Irca and Steel Railroad
Bridges and Viaducts, 1890, Last Ed 25
COOPER. American Railroad Bridges 2.00
CRANDALL. Earthwork Tables 3 .50
CREHORE. Tables and Diagrams for Engineers ana
Architects. 15 Tables and 9 Diagrams, 25 and 50
Cents. List Sent on Request. CROSS. Engineer's Field Book. 4th Ed. 1893.
Greatly Enlarged 1.00
CUMMINGS. Specifications for Electric Lighting of
Buildings 25
CLAY, CUNNINGHAM, STOWELL. Specifications
for Structural Steel 25
DAVIS. Table for Obtaining Differences of Altitude.
In Paper, 50 Cents; Cloth 1.00
DRINKER. Tunneling, Explosive Compounds and
Rock Drills 25.00
DU BOIS. Strains in Framed Structures 10.00
DU BOIS. Mechanics. Vols. 1 and 3, each . . 3.50
Vol. 2 4.00
DUNHAM. Plat and Profile Book 1.00
FANNING. Water Supply Engineering 5.00
FERREL. Treatise on the Winds 4.00
FISH. Lettering 1.00
FLYNN. Flow of Water in Channels 50
FLYNN. Hydraulic Tables 50
FOSTER. Wooden Trestle Bridges 5.00
FOWLER. Specifications for Roofs and Iron Build- ings 25
FREITAG. Architectural Engineering 2.50
GENERAL INDEX TO ENGINEERING NEWS, 1874
to 1890 1.00
GILLMORE. Limes, Hydraulic Mortars and Cements 4.00
GOODHUE, Municipal Improvements 1.75
GOULD. Practical Hydraulic Formulas for the Dis- tribution of Water Through Long Pipes. Revised
and Enlarged Edition 1.50
GOULD. Specifications for Dams and Reservoirs. . 25 GREENE. Graphics for Engineers, Architects and Builders.
Part I., Roof Trusses 1.25
Part II., Bridge Trusses 2.50
Part III., Arches in Wood, Iron and Stone.2.50
HAZEN. Filtration of Public Water Supplies 2.00
HEATH'S Manual of Lime and Cement 2.50
HENCK. Field Book for R. R. Engineers 2.50
HERMANN. Steam Shovels and Steam Shovel Work. 1.00 HERSCHEL AND NORTH. Road Making and Main- tenance 50
HERSCHEL. Continuous Revolving Draw Bridges. . 1.50
HODGMAN. Manual of Land Surveying 2.50
HODGMAN. Surveyor's Tables 1.00
HOWE. Continuous Girder, Theory of 1.25
HOWE. Diagrams for Bridge Engiueers 50
JACOBY. Plain Lettering, Text Book on 3.00
JOHNSON. Drainage Tables 10
JOHNSON. Surveying, Theory and Practice of 4.00
JOHNSON, BRYAN AND TURNEAURE. Designing of Modern Framed btrusturas, Theory and Practice
in the 30.00
JOHNSON. Engineering Contracts and Speciflcations.4.00 JUDSON. City Roads and Pavements. Paper, 75;
Cloth 1.00
JACOBS. Storage Reservoirs 50
KATTE. Railroad Specifications.
No. 1. Construction of Graduation and Masonry. Contents: Articles of Agreement, Formation, Graduation, Masonry, Including Specifications for Laying Masonry in Freezing Weather, Foundations, Timber, Iron Work, General Provisions Ap- plicable to All Work, Indemnity
Bond, 16 pages 25
No. 2. Standard Pile and Timber Trestle
Building 5
No. 3. Cross ties 5
. No. 4. Tracklaying 10
KENT. Mechanical Engineer's Pocket-Book 5.00
KIDDER. Architect's and Builder's Pocket-Book. . 4.00
LOVELL. Practical Switchwork 1.50
McCORD. Mechanical Drawing, in 2 parts. Each.. 2.50
McGEE. Areas of Triangles 10
McGEE. Metrical Equivalents 50
MAHAN. Civil Engineering 5.00
MERRIMAN AND BROOKS. Hand-Book for Sur- veyors 2.00
MERRIMAN. Hydraulics, 5th Ed 4.00
MERRIMAN. Roofs and Bridges, A Text Book on.
Part I., Stresses in Simple Trusses.... 2.50
Part II., Graphic Statics 2.50
MERRIMAN AND JACOBY. Part III., Bridge Design. 5.00
MERRIMAN. Methods of Least Squares 2.00
MERRIMAN. Mechanics of Materials 4.00
MOORE. Tables for Irregular Cross Sections. Com- putation 1.25
NEWMAN. Scamping Tricks 1.00
OCKERSON. Mississippi River, From St. Louis to the
Sea. Paper, $3.00; Cloth, $4.00; Morocco 5.00
OSBORN. Tables of Moments of Inertia 3.00
OSBORN AND HYDE. Specifications for Metal High- way Bridge Superstructure 25
OSBORN AND HYDE. General Specifications for
Bridge Substructure 25
OSBORN AND HYDE. General Specifications for
Railway Bridges 25
PARSON. Landscape Gardening 3.50
PARSONS. Turnouts 25
PATTON. Civil Engineering 7.50
PATTON. Foundations 5.00.
PAUL. Railway Surveys and Resurveys 25
RAFTER AND BAKER. Sewage Disposal in the
United States 6.00
REA. Block Signaling 2.00
REID. Topographical Drawing and Sketching 5.00
REINHARDT. Lettering for Draughtsmen, Engi- neers and Students 1.00
RICHARDS. Compressed Air 1.50
RICHARDS. Centrifugal Pumps 1.00
ROCKWELL. Roads and Pavements in France 1.25
SEARLES. Field Engineering 3.00
SEARLES. The Railroad Spiral 1.50
SHAW. Municipal Government in Great Britain.. 2.00
SHAW. Municipal Government in Europe 2.50
SHUNK. Field Engineer 2.50
SMITH. Pocket Geologist and Mineralogist 1.00
SMITH. Topographical Drawing 2.50
SIEBERT AND BIGGIN. Modern Stone Cutting and
Masonry 1.50
SPALDING. Hydraulic Cements, Testing and Using 1.00
SPALDING. Roads and Pavements 2.00
STALEY AND PIERSON. Separate System of Sew- erage 3.00
PENCE. Stand Pipe Accidents and Failures 1.00
THACHER. Specifications for Highway Bridges... 25
THACHER. Specifications for Railroad Bridges 25
THOMSON. Specifications for Structural Steel for
R. R. Bridges 10
TORRE Y. Switch Layouts and Curve Easements. . 1.00
TRAUTWINE. Civil Engineer's Pocket-Book 5.00
TRAUTWINE. Excavations and Embankments V2.00
VEGA. Logarithmic Tables 2.25
WADDELL. Highway Bridge Specifications 50
WADDELL. Iron Highway Bridges 4.00
WADDELL. Live Loads for Railroad Bridges 25
WARING. Modern Methods of Sewage Disposal. . 2.00 WEGMANN. Masonry Dams, Design and Construc- tion of 5.00
WELLINGTON. Economic Theory of the Location
of Railways 5.00
WELLINGTON. Excavation and Embankments 4.00
WELLINGTON, BAKER AND PENNIMAN. Car
Lighting 1.00
WELLINGTON. Piles and Pile Driving, 2d Ed 1.00
WESTON. Cost of Laying Cast Iron Water Pipe,
2d Ed 25
WHEELER. Civil Engineering 4.00
WILSON. Irrigation Engineering 4.00
Any of the above books will be sent post paid on re- ceipt of price by
THE ENGINEERING NEWS PUBLISHING CO.
O,
LIBRARY
Due two
alter date.
118315