LIBRARY

OF T^JE

UNIVERSITY OF CALIFORNIA.

TABLES

FOB

u (J

OF THE

PROVIDENCE PATTERN," ETC.

BY

EDMUND B. WESTOX,

M. A.M. SOC. C. E ; M. INST. C. E.; ENGINEER IN CHARGE OF WATER DEPARTMENT, CITY ENGINEERS OFFICE, PROVIDENCE, R. I.

SECOND EDITION.

REHRINTED FROM ENGINEERING NEWS, JUNE 21 AND 28, 1890.

NEW YORK: ENGINEERING NEWS PUBLISHING CO.,

1896.

TABLES

FOR

THE "V

UNIVERSITY

IDENCE PATTERN," ETC.

BY

EDMUND B. WESTON,

M. AM. 80C. C. E.J ASSOC. M. INST. C. E.: ENGINEER IN CHARGE OF WATER DEPARTMENT, CITY ENGINEER'S OFFICE, PROVIDENCE, R. I.

MISCELLANEOUS DATA RELATING TO LAYING WATER PIPE, ETC., NOT IN- CLUDING THE COST OF THE PlPE.

Ordinary labor was considered at $1.50 per day.

Short lengths. Total cost of laying 6-in. pipe per lin. ft. from 15 to 50 ft., including excavating and back-filling for the same; in easy digging, $0.34; in medium digging, $0.45.

Extra Excavation. In easy digging, $0.20 percu. yd.

Rock. Average cost of blasting rock per cu. yd., $2.00 Maximum " •' " " " 3.00

Bridges. Cost of crossing bridges, laying pipe, boxing, etc., 12 in., $1.50 per. lin. ft.; cost of crossing bridges, laying pipe, boxing, etc. , Sin. $1.32 per lin. ft.

Kail roads. Cost per lin. ft. of laying 374 ft. of 16-in. pipe that passed under two railroad tracks $0.50.

Work of one man. The average proportion of work that an ordinary laborer will perform in one day, at excavating, refilling and laying pipe (not including calking, etc.), is as follows:

inch

In easy digging 21 lineal feet of 6

" medium '

17.2

M

* •*

" hard

10.3

««

« ,t

" easy " medium '

19.3 13.4

«

8 ' 12

" easy " medium '

9.0 4.4

7,

' 20

' 24

Average cost of excavation for a 24-io. pipe.— The average cost of excavating and back-filling in medium digging, for a line of 21-in. pipe 19,416 ft. long (the average depth of the trench being 6.60 ft. in depth), with ordinary labor at $1.50 per day, was $0.32 per cu. yd.

TABLE NO. 1.

WEIGHT OF WATER PIPES, OF THE "PROVIDENCE PATTERN.1

Length, 12ft. over all.

Nominal diameter in ins.

Class.

Fhick- ness of shell in ins.

Length that pipe ( will lay.

Depth >f bell in ins.

Weight in pounds .

Standard veight in ' Ibs.

Greatest jro posed head in ft.

ser run-' i ning ft.

>er run- ^ ning ft.

as laid.

of shell.

/ ti

13-32

11.83

2.00

19.61

18.11 232

60

j

7-i6

20.88

19.37 247

100

b'

7-16

"

20.88

19.37 247

140

4 <

1532

»»

«

22.06

20.61 261

180

1

£

15-32

•<

'

22.06

20.61 281

220

^

D

15-32

"

4

22.06

2061 261

260

ft

7 16

11.83

2.00

30.25

28.25 i 358

60

f

15-32

32.11

30.12 380

100

i

t

"

'

33.98

31.99

402

140

b •<

B

17-32

,,

44

33.98 35.75

31.99 33.81

402 423

180 220

I

D

l,-32

'•

44

35.75

33.81

423

2dO

ft

15-32

11.82

2.15

42.64

39.93

504

60

J

45.09

42.43

533

100

^

17-32

••

»>

47.63

44.92

563

140

8 -<

TJ

9 18

t.

49.92

47.39

590

180

^,

19 32

»»

<•

52.53

49.84

621

220

1

£>

1332

"

44

52.53 49.84

621

260

/ ft

y

11.81

2 27

56.13

52.58

663

60

i 5

17-32

59.27

55.70

700

100

1 b

9 16

«.

«»

62.31

58.80

736

140

10 •< «

. W-62

(•

65.37

61.89

» 772

180

i

(/

<>

"

68.50

61.95

809

220

D

2132

•«

'4

71.54

68.00

845

260

/ ft

17-32

11.83

2.40

71.19

66.81

840

60

(

A

9-16

"

75.00

70.57

885

100

»<

««

82.37

78.02

972

140

12

12

21-3:'

«*

83.10

81.72

1,016

180

1

c

11-16

it

89 75

85.40

1,059

220

I,

D

"

93.47

89.06

1,103

230

a

19-32

11.78

2.70

105.31

93.77

1.240

60

A

21-3^

115.28

108.76

1,358

10)

11-16

a

'<•

120.34

113.73

1,417 140

16 •<

B

M

'

«•

130.14

123.61

1,533 180

C

13 16

0

..

139.96

133.41

1.648 220

!

D

27-3J

44

"

114.88

138.28

1,706 260

'

ft

2132

11.75

2.95

145.14

135. 80

1,706 60

f

A

2332

157.62

148.29

1,852 100

b

25-32

169.98

160.70

1,998 140

20 •<

B

27-32 '4

182.38

173.05

2,143 180

I

"

'

194.99

185.30

2,292 220

v

D 31-32

44

4 I 207.24

197.49

2,436 280

a 2332

11.73

3.20

190.83

177.91

2,239 60

f

A

13.18

213.30

2J0.36

2.502

100

I

b

"

'

228.16

215.24

2,677

140

24 •<

B

151ri

»'

«»

242.97

230.03

2,850

180

i

C \ 1 1-32

"

"

266.UO

252.09

3,121

220

I

D

1 3-32

44

44

280.66

268.70

3,233

260

a

13-16

11.70

3.63

269.66

250.33

3,155

60

A

29-32

297.78

278.38

3,484

100

1

1

«

<

325.56

306.i'5

3,809

140

30 1

B

1 1-16

ii

"

344.10

324.74

4,026

180

1

C

1 3-16

"

382.56

361.48

4,476

220

v

D

1 9-32

•«

11

409.91

388.83

4,798

260

ft

y

11.67

4.00

351.41

323.93

4,101

60

1

A

1

396.49

368.98

4,627

100

1U

»4

«*

441.13

413.7^

5,148

140

36 -(

B

18

"

485.60

458.15

5,687

180

1

C

1 11-32

"

'

522.07

491.27

6,091

220

I

D

1 15-32

"

14

566.04

535.17

6,604

260

ft

1 5 32

11.54

5;50

632.06

569.93

7,295

60

i

A

1 5 16

707.09

644.91

8.161

100

b

1 15-32

»>

«'

781.60

719.42

9,0-21

140

48 •<

B

"

855.68

793.49

9,876

180

C

1 25-32

«

"

939.20

867.00

10,840

220

D

1 15-16

"

1.012.33

940.10

11,684 260

The thickness of the cast-iron pipes given in this table were calculated by the following formulas:

For diameters greater than 36 ins., t = .00003 II D + .0125 D + .33; for di- ameters of 36 ins. and less, t =.03003 H D + .01 D + .30; t = thickness in decimals of an inch; D = diameter in inches; H = head in feet.

TABLE No. 2.

ESTIMATED AVERAGE CO IT PER LINEAL FOOT OF LAYING CLASSES A AND B, OF CAST-IRON WATER PIPE OF THE "PROVIDENCE PATTERN," AND EXCAVATING AND BACK-FILLING FOR THE SAME, IN MEDIUM DIGGING, WHEN THE MARKET VALUE OF THE PIPE, IS AT DIFFERENT RATE3 PER TON. GATES AND " SPECIALS " ARE INCLUDED, BUT NOT HYDRANTS.

Cost per Ton, and.

DIAMETER

OF PIPE IN INCHES.

Cost per Ton, and

Class.

4

6

8

10 12

18

20

24

30

36

48

Class.

A. ..

0.425

0.610

0.783 1.008 1.245

1.8)9

2.604

3.502

4.919

6.360' 11.0071 ..A.

_

$2d^

B. .

0.410

0.635

0.848 1.079 1.377

2.076 2.902 3.855

5.500

7.396 12.735, . B.

$Jo

of / A. . .

0.437 0 627

0.812 1.038 1.283

1.957

2.684 3 608

5.096

6.547

11.341 ..A.

26 \

B. ..

0.452 0.653

0.873 1.112 .420

2.142

2.993

3.975

5.670

7.625

13.138

..B.

'•O

'A.

0 448 0.614

0.835 1.068 .320

2.015

2.763

3.714

5.243

6.734

11.675

..A.

01

27 IB:::

0.163 0.671

0.898 1.145 .463

2.207

3.085

4.095| 5.839

7.854

13.541

. B.

27

'A.

0 459 0.631

0.853 1.098 .353

2.074

2.843

3.819 5.391

6.921

12.009

..A.

OP

28 j

B*

0.475 0.689

0.923, 1.178 .506

2.272

3.176

4.245 6.009

8.082 13.944

..B.

to

A.

0.470i 0.673

0.88) 1.128 .396

2.132

2.923

3.925J 5.538

7.HJ9 12.343

..A.

.1(1

29-

j}'

0.436 0.707

0.918

1.211 .550

2.338

3.268

4.334 6.178

8.311

14.347

..B.

JQf

A. ::

0 481

0.535

0.905

1.153 .434

2.190

3.002

4.030

5.686

7 296

12.677

. A.

Oft

30

B.

0.493

0.725-

0 973

1.214 -593

2.403

3 359

4.454

6.348

8.540

14.750

. B.

30

A. ..

0.492

0.742

0.926

1.188 .472

2.248

3.082

4.136

5.833

7 483

13.011

..A.

31

B. ..

0.513 0.743

0.938

1.276 .653

2.468

3.451

4.574

6.517

8.768

15.154

..B.

31

A...

0.5331 0.729

0.943

1.213 .510

2.307

3.162

4 241

5.980

7.671 13.345

..A.

oo

32

B. ..

0.521 0.761

1.023

1.309 .679

2.534

3.542

4.693

6.686

8.997 15.557

..B.

61

A...

0.514

0.748

0.971

1.243 .548

2.365

3 2tl

4.347

6.128

7 858 13.679

.A.

oo

33

B. ..

0.535

0.779

4.043

1.1342' .722

2.599

3.634

4.813

6.856

9.226 15.S60

. B.

66

A. ..

0.525

0.762

0.934

1.273 .536

2.423

3.321

4 453 6.275

8.045 14.013

.A.

'.» i

31^

0.544

0.797

1 073

1.375 765

2 664

3 726

4.933 7.025

9.454 I«.c63

..B.

o4

A. : .

0.553

0.77)

1.017

1.308 .621

2.481

3 400

4.558

6 423

8 232! 14.347

O"

35

B. ..

0.538

0 815

1.093

1.408 .809

2.730

3.817

5.052

7.1 5

9.683 16 766

'.'.B!

OJ

op

A.

0.547

0.793

1.039 1.338! .662

2.540

3.480

4 664

6.570

8.4*0 14.681

. A.

Of!

36

B. ..

0.5)3

0 835

1.124; 1.440 .852

2.795

3.909

5.172

7 364

9.9,-2 17.169

..B.

BO

OT

A. ..

0.553

0.813

1.032

1.383 .699

2 598

3.560

4.769

6 717

8.607

15 015

.A.

O>7

37

B. .

0.579

0.851

1.14.)

1.473 895

2.860

4.000

5.292

7.534

10.141

17.572

B.

61

A. ..

0.570 0.83)

1.085

1.3)81 .737 2.653

3.639

4.875

6-865

8 794

15.349

..A.

no

o3

B. ..

0.591

0 8ii)

1.1711 1.503

.933

2.926

4.092

5 412

7.703

10.369

17.S75 ..B.

OO

A...

0.581

0.847

1 133 1.427

.775

2 714

3.719

4.981

7.012

8.981 15.083

A.

on

o3

B. ..

0.602

0.857

1.199

1.533

1.931

2.991

4.183

5.53L

7.873

10.5981 18.o79

..B.

3v

A...

1.582

0.861

1.13)

1.457

1.813J 2.773

3.798

5.086

7 160

9.169 16.017

..A.

40

4J

B. ..

0.644

0.935

1.224

1.572

2.025

3.056

4.275

5.651

8.042

10.8271 18.782

..B.

4U

11

A...

0.605

0.831

1.155

1.487

1.851

2.831

3.878

5.192

7.307

9.3561 16.351

..A.

41

41

1 B.

0.625

0.923

1.249

1.605

2.068

3.122

4.366

5 771

8.211

11.055 19.185

..B.

4 L

19 J

fA...

0.614

0 893

4.173

1.547

1.839

2.839

3.958

5.297

7.454

9.543 16 685

..A.

19

42

B. ..

0.657

0.941

1.271

1.637

2.111

3.187

.458

5.890 8.1:81

11.284

19 588

..B.

4-

10 ( A. . .

0.62.

0.915! 1.193

1.547

1.927

2.947

.037

5403 7. '02

9.731

17 (19

..A.

._

43

L B. . .

0.649

0 959

1.293

1.670

2.14

3.252

.549

6.010 8.550

11 513

19.S91

..B.

4o

, t

A. .

0.636

0.932

1.965

3.003

.117

5.503J 7.749

9.918

17.353

. A.

11

44

B,

0.630! 0.977

024

l'.7d3

2.197

3.318

.641

6.130 8.72011.741

20.S94

..B.

44

0.647

0.949

1.244

1.637

2.003

3.064

.137

5.614 7.896

10.105

17.687

..A.

A £

45

B*

0.872

0.995

1.349

1.733

2.241

3.383

.732

6 249

8.88911-870

20 797

. B.

40

j/»

f A'. ' :

0.658

0.933

1 237

1.657

2.010

3 122

4.276

5 720

8 044

10 292

18 021

..A.

46

IB.

0 684| 1.013

1.374

1.769

2.234

3 448

4.824

6 369 9 059

12 199

'/1. 2(10

..B.

46

A.

0.639 0.983

1.637

2.078

3 180

4.356

5 82* 8 191

10 480

18 355

..A

Art

47

IB. ..

0.695

1.031

1 393

1.8)2

2.327

3 514

4.915

6 489 9.228 12 428

21 604

..B.

4/

gm

A. ..

0.63) 1.0 0

1.312

1.697

2 116

3. 39

4 435

5 931 8 339

10 667

I860, A.

48

48

B.

0.707

1 0'<9

1.424

1.834

2.370

3.579

5 007

(> 609 9.398

12 656

22 007

..B.

4o

A...

0 691 1.017

1 1.335

1.727

2.154

3.297

4.515

6 036 i 8 486

10 854

19 024

4Q

49

B. .

0 718! 1 057

1.449

1.867

2.413

3.644

5 0)8

6 7281 9 567

12.885

22 410 ..B.

±v

dri

A...

0 702 1.034

1 358 1.757

2.192

3.355

4 595

6 142! 8 65311 041

19 358 . A.

CA

OU

B. ..

0.730

1.085

1.475 1.90J

2 456

3 710

5 DC

G 843 9 737

13 114

22 813

. B.

on

The thickness of the Class A pipe was based upon a static pressure of 10(> ft., and the Class B pipe upon a static pressure of 180 ft.

The figures include the cost of pipe, gates an I " specials," the cost of cart- ing, laying and setting, and excavating and back-filling for the same, and all other expenses generally incurred in ordinary water pipe laying, with the exception of the cost of hydrants.

The cost of "specials" was based upon $0.025 per pound, with pipe at $30 per ton, the cost of air-cocks (used only with pipes having a diameter larger than 20 in.), at $10 each, and the cost of the gates the same as given in Table No. 3.

Ordinary labor was considered at $1.50 per day.

Depth of Pipe.— The depth of the axis of the pipe below the surf ace of the ground has been considered in all cases as 4.67 ft.

I!

s 15 a s &

32 8 22 S3

B SZ S

1 8

8 S.

gs s s 3

g3j « o ^

- -

a s s s- s

I 1 1 1

^-o^is I *j 2 S S 22 S

I i

S 2

£ S S S

o

= ! § o i u -SH 5 s

I H

11

8 .* . -

S S § S

i-l QC O

« - |

XX^-;X^^rfo(=<=(=eSOOC5C;300000f-l— I'-K-'rH^Hr-KMNCO

i; * O I

,c^

a-MdMd;N|:E;:S;:a;:S;:a;:S;

ST-J J-2irt hl»-«T3 :»,"TTJ t^-TT: ^S'O ^^^ t^S^ ^ST3. >>S'?.

§ lg

^ 03 '3

O j£,

M «-

i if

'•as s

> p ••c 2

45 fc*^

P eS-C

'El

OB 5

ill

*-> *S ^

P &JLOD

^ ^ p, g a

§1! 12

R^ P flj ^-02

•"•^ as JB

O «D «D £t

P4

O

x ee-

I !

-M O

S 'i

ZrS'O S-*3 S -^

o^^.88*5-

^

TABLE NO. 4.

WEIGHT AND COST OF SPECIAL CASTINGS, ETC.

To be used in connection with Table No 3 when greater accuracy with regard to •" specials " is required.

Nature of " special" Xin inches).

Length that " special" will lay.

Weight in pounds.

Cost at $ .03 per pound.

Nature of "special" ;(in inches).

Length that "special" will lay.

Weight in pounds.

Cost at $.03 per pound.

Branches.

Feet.

$

Reducers.

Feet.

$

6X 4 6X6 6 X 6 X 6 6X8 6 X 6 X 8 8 X 4 8X6

3 x e

8X8X8 8X8X6 8X6X6 10 X 6 10 X 6 X 6 10 X 8 X 6 10 X 8 10 X 8 X 8 12 X 6 12 X 6 X 6 12 X 8 X 6 12 X 8 12 X 8 X 8 12 X 10 12 X 12 16 X 6 16 X 6 X G 16 X 8 X 6 16 X 8 16 X 8 X 8 16 X 10 16 X 12 16 X 12 X 12 16 X 16 20 X 6 20 X 6 X 6 20 X 8 20 X 8 X 6 20 y 10 .20 X 10 X 8 20 X 12 20 X 16 24 X 6 24 X 6 X 6 24 X 8 24 X 8 X 8 24 X 10 24 X 12 24 X 16 24 X24 30 X 6 SOX 8 30X 8 X 6 -30 X 8 X 8 30 x 10 30 X 12 30 X 12 X 8 30 X 16 30 X 20 30X24 30 X 24 X 12 30X30

Blow offs..

3.22 3.22 3 22 3.22 3 22 3.20 3.20 3.o6 3 20 3.20 3.20 3 36 3.36 3.36 3.36 3.36 3.22 3.22 3.22 3.^2 3.22 3.39 3.22 3.03 3.03 3.03 3.20 3.20 3.20 3.20 3.20 3.20 '. .84 .84 .84 .84 .84 .84 .84 .84 .53 .53 .53 .53 .53 ' .53 .53 .53 5.04 5.04 5.04 5.04 5.04 5.04 5.04 5.04 5.04 5.04 5.04 5.04

190 190 235 218 265 239 243 287 362 315 234 353 360 426 356 446 394 469 581 428 481 535 453 5»8 660 661 641 733 638 627 800 84o 1123 1202 1183 1190 1112 1250 1233 1383 1082 1453 1345 1540 1463 1408 1537 1656 1955 1980 2150 2145 2078 2048 2210 2290 2288 2560 2695 2478

5.70 5.70 7.05 6.54 7.95 7 17 7.29 8.61 10.86 9.45 8.52 10.59 10.80 12.78 10.68 13.38 11.82 14.07 17.43 12.84 14.43 16.05 13.59 17.64 19.80 19.83 19.23 21.99 19 14 18.31 24.00 23.35 33.69 36.06 35.49 35.70 33.36 37.50 36.99 41.49 32.46 43.59 40.35 46.20 43.89 42.24 46.11 49.68 53.65 59.40 64.50 64.35 62.34 61.44 66 30 68.70 68.64 71.80 80 85 74.34

6 to 4 8 to 6 10 to 8 12 to 8 16 to 12 20 to 16 24 to 12 30 to 24

Turns. 4—1-16

4-*6

Sie

6— y*

8-1-16 8-K

8-V4 10-1-16

io-4$

12- K

Bevel hubs 6 8 10 12

Spig't caps 6 8 10 12 16

Bell caps. 6 8 10 12 16 20 24 30

Plugs.

6 8 12

Sleeves. 4 6 8 10 12 16 20 24 30 36

Gate boxes Large ' " rings. ' cov'rs Small box (6") ' cover (6 ') " box (8") 1 cover (8")

1 63

1.95 1.65 2.61 2.70 4.17 4.59 3.04

1.55 1.33 1.89 1.58 1.42 1.38 3.57 3 32 2.25 3.48 3.23 3.22

1 75 1.74 3.94 1.72

65

105 148 205 338 863 923 1158

48 47 61 90 92 109 233 239 136 291 296 443

90 130 316 219

39 57 78 110 155

41

63 78 118 160 220 342 548

10 15 27 67

38 56 80 107 131 207 319 457 637 907

689 142 83

137 19 160 38

1 95 3.15 4 44 6.15 10.14 25.89 27.69 34.74

1.44 1.41

1.83 2.70 2.76 3.27 6.99 7.17 4.08 8.73 8.88 13.28

2.78 3.90 9.48 6.57

1.17 1.71 2.34 3.36 4.65

1.23 1.89 2.34 3.54 4.b0 6.60 10.26 16.44

.30 .45 .81 2.01

1.14 1.68 2.40 3.21 3.93 6.21 9.57 13. 7 J 19.11 27.21

20.67 4.26 2 49

4.11 .57 4.80 1.14

24 X 6

30 X 8

Manholes.. . .

4.53 5.04

1377 2055

41.31 61.65

21 30 36

Hydrant

4.53

5.04 4.00

1625 2020 2015

1010 491

102

48.75 60.60 60.45

Hydrant box Frame and cover

14.73 3.06

TABLE NO. 5.

COST IN DETAIL OF LAYING WATER PIPE OF THE "PROVIDENCE PATTERN/' INCLUDING EXCAVATING AND BACK-FILLING FOR THE SAME.

Excavation (Easy Digging).

Items.

Diameter in inches.

Average prices of labor, etc.

4

G

8

10

.0707 .0219 .0216 .0 69 .0111 .0553 .0136 .0275

12

13

20

24

1 Trenching 2 Laying 3 Foreman 4 Tools, etc., etc 5 Calking 6 Lead 7 Teams . . ...

.0422 .0129 .0130 .0041 .0106 .0224 .0070 .0078

.0518 .0162 .0158 .0050 .0107 .0320 .0090 .0149

.0611 .0191

.0188 .0059 .0108 .0431 .0115 .0208

.0798 .0249 .0244 .0078 .0118 .0683 .0160 .0346

.2676

.1445

.0370 .0303 .0134 .0159 .0950 .0203 .0518

.4082

.2088 .0497 .0360 .0191 .0301 .1203 .0216 .0746

$1.50 1.50 3.00 1.1% of 1 » nd 2. $2.25 5c. per pound. $2.25 $1 per ton.

8 Carting

Total .

.1200

.1554

.1911

.2286

.5602

Cost of Easy Digging reduced to $1 and Ic.

Trenching

0281

.0345

.0407

.047l!

.0532!

.09631

.1392 ...

$1.00

Laying

.0086

.0108

.0127

.01461

.0166

.0^47 !

.0331

1.00

Foreman

.0043

.0053

.0063

.00721

.0081

.0101

.0120

1.00

Tools, etc., etc

.0006

0007

.0008

.OOU9

.0011

.0018

.0026J

w

Calking .

.0047

0047

.0048

0049

.0052

.0071

01341

$1.00

Lead

0045

0064

0086

0111

0137

0190

0241

.01

Teams . .,

.0031

.0040

.(051

.0060

.0071

.0090,

.0096

1.00

Cartina:

.0078

.0149

.0208

.0275|

.0346|

.0518,

.0746i

1.00

Excavation (Medium Digging}

1 Trenching

0597

0697

0790

0883

0974

1700

2403

3091 ' $1 50

2 Laying

.0189

.0220

0249

0307

.0440

.0577

.06391 1.50

3 Foreman 4 Tools, etc., etc 5 Calking 6 Lead . . .

.0180 .0056 .0106 0224

.0206 .0065 .0107 .0320

.0234 .0075 .0108 0431

.0265 .0084 .0111 0553

.0294 .0093 .0118 0683

.0350 0154 .0159 .0950

.0373 .0214 .0301 .1203

039 jj 3.00 .0602 7.2^ of land 2* .0757 $2.25 .1600 5c. per pound.

7 Teams 8 Carting ... ...

.0070 0078

.0090 0149

.0115 0208

.0136

0275

.0160 .0346

.0203 0518

.0216 .0746

0228J $2.25 .1317' $1 per ton.

Total

1500

1854

2210

.2586

2975

4474

6030

.sero

1

Cost of Medium Digging reduced to $1 and Ic,

Trenching . .

.0331

.0465

0527

.0589

.06941 .1133

.1600' .2061

$1.00

Lay-in01

0126

0147

0166

0186

0205' 0293

0385 0426

1.00

foreman Tools, etc., etc Calking .,

.0060 .0008 0047

.0069 .0009 .0047

.0078 .0010 0048

.0088 .0012 .0:49

.0098 .0117 .00131 .0021 .00521 .0071

.01241 .0132 .0030' .0037 .0134J .0336

1.00

w*

$1.00

Lead . .

0045

0064

0086

0111

0137 0190

0241 0320

.01

Teams

0031

.0040

0051

.0060

.007H .0090

.0096 .0101

100

Carting

0078

0149

0208

0275

0346 0518

0746 .1317

l.CO

i

Excavation (Hard Digging).

1 Trenching

0860

0959

1053

1147

1300

2261

3264

$1 50

2 Laying ,

0271

0303

C333

0362

0411

05'-50

0669

1 50

3 Foreman 4 Tools etc., etc

.0260 0081

.0286 0093

.0314 0099

.0343 0109

.0372 0118

.0428 0201

.0452 0283

B.OO

7 2% of 1 and 2

5 Calking 6 Lead

.0106 0224

.0107 0320

.0108 0431

.0111 0553

.0118 0683

.0159 0950

.0301 1203

$2.25

7 Teams

0070

0090

0115

0136

0160

0203

i 216

' $2 25

8 Carting

.0078

.0149

.0208

.0275

.0346

.0513

.0746

$1 per ton.

Total

.1950

.2304

.2661

.3036

.3508

.5250

.7134

Cost of Hard Digging reduced to $1 and Ic.

Trenching

.0573

Laying

0181

Foreman

.0087

Tools, etc., etc

.0011

Calking . . .

0047

Lead ... Teams . . .

.0045 0031

Carting

.0078

0202 .0095 .0013

0047 .0.064 .0040 .0149

.0702 .0222 0105 .0014

.0048 .0086 .0051 0208

.0765 .0241 0114 .0015

.0867 .0274 .0124 .0016

.0049! .0052

.01111 .0137

.0060, .0071

.0275 .0346

.21761..

.1507

.0353 0446J.

.0143 .0151'

.(039

.00711 .0134 ..

.0518 .0746!..

$100 1.00 1.00

w

$1.00

.01

1.00

1.00

The percentage for 24 inch includes blocks and wedges, and is 16-

9

This table, No. 5, contains the items in detail from which the cost of the labor of laying water pipe, from 4 to 24 in. in diameter, given in Table No. 3, were obtained.

The word "Trenching" is used for excavating and back-filling.

Throughout these tables Easy Digging is intended to correspond to exca- vation in sand, etc.; Medium Digging to excavation in sand and gravel, etc.; and Hard Digging to excavation in hard or moist clay, etc. The figures relat ing to medium excavation are probably the most reliable for pipes that have a diameter greater than 8 ins.

The prices given in any of the tables do not include the cost of engineering and inspection.

SUPPLEMENT TO TABLES NOS. 2, 3, AND 5.

The following table gives the items of the actual cost of the labor of laying water pipe ana excavating and back-filling for ihe same, upon which Tables Nos. 2, 3 and 5 were based, with, the exception of the cost of carting pipe, which was considered at $1.00 per ton. The table also shows a comparison of the items of actual cost with the amountx that correspond to them in Tables Nos. 2, 3 and 5. The tabl" was computed from rec- ords kept in Providence, with the exception of the data that refers to the 48-twc/i pipe, which was obtained elsewhere.

Length of pipe used in feet.

Excavating, back-filling and laying.

3. Calking.

4.

Teaming

Total of 1, *,3 and 4.

Total corre- sponding to 1, L>, 3 and 4, from Table No, 5, etc.

Exca- vating, etc.

Laying, etc.

Total of i and 2.

Total corre- sponding to 1 and 2 from Table No. 5, etc.

4 inch. Medium Digging.

1,214 Ave., etc..

$.09460

$.09660

$.01300

$.00650

$.09460

$.09660

$.01300

$.00650

$.11410

$.11420

ti-inch, Easy Digging.

480 422 38U 533 201 378 401 416 364 181 320 711 545 1,501 228 265 485 266 442

Ave., etc..

$.06781 .10147 .06374 .07576 ' .09127 .06874 06039 .07416 .05818 .08057 .05778 .05108 .05771 .07488 .07017 ,06566 ,05567 .05677 .06493

$.00959 .02177 .02253 .01444 .01975 .02063 01376 ,01696 .01922 .1.1362 .01906 .01293 .01686 .02037 .01211 .01389 .01136 .01038 .01040

$.00338 .01173 .0,067 .01098 .00564 .01518 .00899 .01083 .OOJ25 .01373 .01053 .(,0854 .00950 .00480 .0(294 .00426 .00324 .00338 .00355

$.01171 .01173 .01067 .01098 .01237 .01518 .01011 .01083 .00928 .01373 .O10.i6 .00886 .00872 .00524 .00496 .00423 .00326 .00338 .00358

I

1

$.06825

$.01577

$.08402

$.08380

$.00827

$.00891

$.10120 | $.10350

6-inch, Medium, Digging.

526 666 242 7^2 727 144 318 164 428 1,039 138 597 129 131 311 273 406

Ave., etc..

$.09366 .(18989 .114996 .07204 .10241 .12185 .14775 .06288 .06301 .09476 .06594 .05717 .1031i> .08992 .07180 .143nO .087ul

$.02319 .01477 .01901 .01883 .01264 .04756 .01448 .01413 .01998 .01625 .02(538 .01540 .02155 .01637 .01479 .02817 .02227

$.01198 .01117 .00930 .00922 .01362 .02027 .01416 .00060 ,01157 .01474 .01138 .01131 .01566 .01055 .00868 .015(51 .00999

$.01198 .01)981 .01115 .01014 .01208 .02034 ,0(1919 .009(56 .01157 .01278 .01145 .01040 .01217 .01056 .00868 .01399 .00777

$.01140

$.08918

$.02034

$.10952

$.11230

$.01333

$.13425

$.13200

10

Supplement to Tables Nos. 2, 3, and 5. (Continued.)

Excavating, back-filling and laying.

Total

corre-

Length of

Total corre-

sponding to 1, 2, 3

pipe used in feet.

14 Exca- vating,

2.1 Laying,

etc

Total of 1 and 2.

sponding to 1 and 2 from

8

Calking.

4.

Teaming

Total of 1, 2,3 and 4.

and 4, from Table

etc.

Table

No. 5,

Is o.5,

etc.

etc.

6-inch, Hard Digging.

265

$.08276

$.02301

$.01275

$.01698

307

.14378

.01645

01098

01101

Ave., etc..

$.11327

$.01973

$.13300

$.15480

$.01186

$.01399

$.15885

$.17450

8-inch, Medium Digging.

496

$.08794

$.02458

$.00907

$.00544

3,743

.06898

.01654

.00541

.00421

5*9

.07656

.01272

.00425

82

.OJ756

.01122

.01098

Ave., etc..

$.08276

$.01626

$.09902

$.12730

$.00743

$.00483

$.11130

$.14960

S-inch, Hard Digging.

157

$.12540

$.02924

$.02147

$.01433

Ave., etc

$.12540

$.02924

$.15464

$.17000

$.02147

$.01433

$.19044

$.19230

1'2-inch, Easy Digging.

1,255

$.09207

$.02388

$.01147

$.00609

Ave., etc

$.09207

$.02388

$.11595

$.12910

$.01147

$.00609

$.13351

$.15690

12-inch, Medium Digging.

1,132

$.09627

$.04595

$.11220

$.01193

$.00569

2 161

.12400

.01030

4283

.10070

01650

1 785

.13350

589

.16930

0°10)

Ave etc

$.13394

$.15750

$.01193

$.01337

$ 15920

$ 18530

16-inch, Medium Digging.

374

$ 22818

$.04904

$.27720

$.02107

$.02045

2,839

.25830

.01820

Ave., etc..

$.-6780

$.24900

$.02107

$.01933

$.30820

$.28520

20-inch, Easy Digging.

242

$.15876

$.04417

$.02508

$.02513

1 450

.15820

.08383

.03010

.04310

Ave., etc..

$.15848

$.05400

$.21250

$.29450

$.02759

$.03411

$.27420

$.34620

24-mc/i, Medium Digging. *(

19 416

$ 32820

$.07310

$.07570

$.02280

Ave, etc..

$.32820

$.07310

$.40130

$.41260

$.07570

$ 02280

$.49980

$.51110

11

Supplement to Tables Nos. 2, 3, and 5. (Continued.)

Excavating, back-filling and laying

1

Total

corre-

Total

sponding

Length of pipe used in feer,

Exca- vating, etc.

r 24

Laying, etc.

Total of 1 and 2.

corre- sponding to 1 and 2 from Table

3. Calking.

4.

Teaming

Total of 1, 2,3 and!.

tol. 2, 3 and 4, from Table No. 5,

No. 5,

etc.

etc.

21-inch, Medium Digg'fig (2.)

19,416 Ave., etc..

$.38940

$.08180

$.07570 $.07570

$.02230

i

^.36940

$.08180

$.45120

$.02280

$.54970 j

30-inch, Easy Digging.

561 Ave etc

$.37000

$.08420 $.08420

$.37000

48-inch, Medium Digging.

$1.950t $1.650t

t Including foreman.

* (1) Reduced by proportion to correspond to a depth of 4.67, from (2) 5.43 feet the ac- tual depth.

t These figures include calking. The $1.95 is based upon ordinary labor at $1.75 per day, and $2. 00 per day for laying. The $1.65 is based upon labor at $1.50 per day, and was reduced by proportion from $1.95, assuming that the number of layers \, as 1-10 the number of other laborers.

TABLE NO. 6.

COMPARISON BETWEEN THE TOTAL COST PER LINEAL FOOT OF THE LABOR OF LAYING WATER PIPE AND EXCAVATING AND BACK-FILLING FOR THE SAME, ETC., GIVEN IN THE PRECEDING TABLES, FOR MEDIUM DIGGING, AND WHAT THE TOTAL COST WOULD BE IF THE TRENCHING, ETC., HAD BEEN BASED UPON $0.30 PER CUBIC YARD INSTEAD OF THE AMOUNTS CHARGED TO TRENCHING, ETC., IN TABLE NO. 5. THE COST OF LAYING, ETC., HAS BEEN CONSIDERED THE SAME IN BCTH CASES.

SI-

~~ ~ -~

At $0.30 per cubic yard.

From Table No. 5.

8J5.5

fail*

SlfeS

Q

Laying, etc.

Trenching, etc.

Total.

Laying, etc.

Trenching, etc.

Total.

$.0676 .0886 .1099 .1334 .1583 .2235 .3)35 .4876

$.1382 .1506 ,16o2 1758 .1890 .2160 .2447 .2742

$.2058 .2392 .2731 .3092 .3474 .4395 .5482 .7618

$ 0676 .0886 .1099 .1334 .1583 .2235 .3035 »4876

$.0833 .0968 .1111 .1252 .1392 .2239 3154 .3754

$.1509 .18£4 .2210 .2586 .2975 .4474 .6189 8630

+$.0549 + .0538 4- .0521 •f .0506 4- .0498 .0079 - .0707 - .1012

In this table, under the division headed "At $0.30 per Cubic Yard," the cost per lineal foot of Trenching, etc., is based upon the excavation at $0.30 per cubic yard, measured in the trench, instead of the actual cost, and takes the place of the amounts charged in Table No. 5, for medium digging, to trench- ing, teaming, and % the amount charged to foreman and tools, etc. (ex- clusive of the cost of blocks and wedges, which are included in the cost of Tools, etc., for 24-inch pipe, in Table No. 5). The figures relating to laying, etc., are the same as those charged in Table No. 5 for medium digging, to laying, calking, lead, carting, and % the amount charged to foreman and tools, etc. (exclusive of the cost of blocks and wedges, which are included in the cost of tools, etc., for 24-inch pipe, in Table No. 5). In each instance, in calculating the cubic contents of the trench, the width was considered as 2 feet more than the diameter of the pipe and % of a foot deeper than the water line of the same.

12 TABLE NO. 7.

AMOUNT PER LINEAL FOOT TO BE ADDED TO THE FIGURES GIVEN IN THE PRECEDING TABLES FOR RELAYING PAVING, ETC., IN CASES WHEN THE STREETS ARE PAVED BE- FORE THE WATER PIPE IS LAID.

Diameter of pipe in

inches

4

6

8

10

12

16

20

24

30

36

48

Cobble stones Granite blocks laid

$0.12

$0.12

$0.12

$0.13

$0.13

$0.14

$0.16

$0.17

$0.18

$0.20

$0.23

upon a sand founda-

tion

0.18

0.18

0.18

0.19

0.20

0.22

0.24

0.25

0.27

0.30

0.35

Granite blocks, con-

crete foundation,

joints filled with pea gravel and asphal-

,

tum

0.93

0.96

1.C1

1.05

1.09

1.18

1.32

.1.37

1 50

1.64

;1-M

The cost of a square yard of broken stone £ ins. thicfc, put properly in place in a street, would be about $0.40.

The figures in this table were based upon a trench 3 ft. wider at the surface of the ground than the diameter of the pipe, in order to allow for caving, etc.

The cobble stone paving was considered at $ 0.30 per square yard, the granite blocks laid upon sand foundation at $0.45 per square yard, and the granite blocks laid upon a concrete foundation, etc., at $3.46 per square yard. The granite blocks were estimated to lay from 24 to 27 per square yard.

TABLE NO. 8.

AVERAGE COST OF LAYING LEAD SERVICE PIPE, INCLUDING EXCAVATING AND BACK- FILLING FOR THE SAME.

Tap and stop.

Pipe per lineal foot.

Tap, stop,

"Wpicrht

Laying, etc., pil

3tc., including )e.

tapping.

Lead pipe.

Tin-lined lead pipe.

%inch.

V-2 "t I4 "

$6.00 6.23 6.81 8.67 10.71

inch. 1 4 '

\y\ ite

3.00 pounds. 4.00 4.75 6.00 9.00 10.00

$0.34 0.40 0.45 0.52 0.70 0.76

$0.52 0.64 0.73

r.88

1.24 1.36

The labor of excavating, back-filling and laying, etc., was considered in all cases for lead pipe at $0.16 per foot. The price used for lead pipe was $0.06 per pound, and the price for tin-lined lead pipe $0.12 per pound.

ENGINEERING NEWS

AND AHERICAN RAILWAY JOURNAL

Published every Thursday at Tribune Building, New York. 23d Year. Five Dollars.

Engineering News contains each week twenty- four pages of valuable reading matter, cover- ing the entire field of engineering science in both this and foreign countries. Railways, water- works, bridges, manufacturing and technical, con- tracting, mechanical and electrical industries are fully reported, and detailed working drawings and full descriptions are given of all the more im- portant and note worthy structures and enterprises. Record is kept of the proceedings of the engi- neering and technical societies and clubs, and the latest technical books and magazines are fully re- viewed and discussed. The correspondence col- umns contain communications from engineers, contractors and others, regarding matters of cur- rent interest.

The advertising columns and those of "Con- struction News" constitute the most complete rec- ord of the current contract work of engineering in the United States that is obtainable. Together they make a very complete index of new rail- roads, new water-works, sewer building, street paving, highways, river and harbor improve- ment, bridge construction, public buildings erect- ed, tunneling, pile driving, dredging, blasting op- erations, experiments and actual work in concrete and cement, electricity and gas, artesian wells, canals, everything, in fact, having any relation to public work, or the business of civil engineering and contracting, while from the abstracts of bids published from week to week, the prices of labor, materials and other elements of cost of engineer- ing work in different parts of the country are ob- tainable.

A PARTIAL LIST

OF THE LATEST AND MOST

POPULAR ENGINEERING PUBLICATIONS

FOR SALE BY

THE ENGINEERING NEWS PUBLISHING CO., TRIBUNE BUILDING. NEW YORK.

BAKER. Surveying instruments $3.00

BAKER. Masonry Construction 5.00

BAUMEISTER. Cleaning and Sewerage of Cities,

2d Ed 2.50

BARSTOW. Cost of Laying Water Pipe 10

BERG. Buildings and Structures of American Rail- roads 7.50

BLACK. Public Works of the U. S 5.00

BOUSCAREN. Specifications for Highway Bridges

and Viaducts of Iron and Steel 25

BOUSCAREN. Specifications for Railroad Bridges

and Viaducts of Iron and Steel 25

BOVEY. Hydraulics, A Treatise on 4.00

BUCHANAN. Tables of Squares of Feet and Inches. 2.00

BURKE. Brick for Street Pavements 50

BYRNES. Highway Construction 5.00

CHAMBERS. Mathematical Tables . . 1.75

CHURCH. Mechanics of Engineering G.OO

CLOUGH. What an Engineer Should Know About

Electricity 50

COOPER. Specifications of Iron and Steel Highway

Bridges and Viaducts, 1890, Last Ed 25

COOPER. Specifications of Irca and Steel Railroad

Bridges and Viaducts, 1890, Last Ed 25

COOPER. American Railroad Bridges 2.00

CRANDALL. Earthwork Tables 3 .50

CREHORE. Tables and Diagrams for Engineers ana

Architects. 15 Tables and 9 Diagrams, 25 and 50

Cents. List Sent on Request. CROSS. Engineer's Field Book. 4th Ed. 1893.

Greatly Enlarged 1.00

CUMMINGS. Specifications for Electric Lighting of

Buildings 25

CLAY, CUNNINGHAM, STOWELL. Specifications

for Structural Steel 25

DAVIS. Table for Obtaining Differences of Altitude.

In Paper, 50 Cents; Cloth 1.00

DRINKER. Tunneling, Explosive Compounds and

Rock Drills 25.00

DU BOIS. Strains in Framed Structures 10.00

DU BOIS. Mechanics. Vols. 1 and 3, each . . 3.50

Vol. 2 4.00

DUNHAM. Plat and Profile Book 1.00

FANNING. Water Supply Engineering 5.00

FERREL. Treatise on the Winds 4.00

FISH. Lettering 1.00

FLYNN. Flow of Water in Channels 50

FLYNN. Hydraulic Tables 50

FOSTER. Wooden Trestle Bridges 5.00

FOWLER. Specifications for Roofs and Iron Build- ings 25

FREITAG. Architectural Engineering 2.50

GENERAL INDEX TO ENGINEERING NEWS, 1874

to 1890 1.00

GILLMORE. Limes, Hydraulic Mortars and Cements 4.00

GOODHUE, Municipal Improvements 1.75

GOULD. Practical Hydraulic Formulas for the Dis- tribution of Water Through Long Pipes. Revised

and Enlarged Edition 1.50

GOULD. Specifications for Dams and Reservoirs. . 25 GREENE. Graphics for Engineers, Architects and Builders.

Part I., Roof Trusses 1.25

Part II., Bridge Trusses 2.50

Part III., Arches in Wood, Iron and Stone.2.50

HAZEN. Filtration of Public Water Supplies 2.00

HEATH'S Manual of Lime and Cement 2.50

HENCK. Field Book for R. R. Engineers 2.50

HERMANN. Steam Shovels and Steam Shovel Work. 1.00 HERSCHEL AND NORTH. Road Making and Main- tenance 50

HERSCHEL. Continuous Revolving Draw Bridges. . 1.50

HODGMAN. Manual of Land Surveying 2.50

HODGMAN. Surveyor's Tables 1.00

HOWE. Continuous Girder, Theory of 1.25

HOWE. Diagrams for Bridge Engiueers 50

JACOBY. Plain Lettering, Text Book on 3.00

JOHNSON. Drainage Tables 10

JOHNSON. Surveying, Theory and Practice of 4.00

JOHNSON, BRYAN AND TURNEAURE. Designing of Modern Framed btrusturas, Theory and Practice

in the 30.00

JOHNSON. Engineering Contracts and Speciflcations.4.00 JUDSON. City Roads and Pavements. Paper, 75;

Cloth 1.00

JACOBS. Storage Reservoirs 50

KATTE. Railroad Specifications.

No. 1. Construction of Graduation and Masonry. Contents: Articles of Agreement, Formation, Graduation, Masonry, Including Specifications for Laying Masonry in Freezing Weather, Foundations, Timber, Iron Work, General Provisions Ap- plicable to All Work, Indemnity

Bond, 16 pages 25

No. 2. Standard Pile and Timber Trestle

Building 5

No. 3. Cross ties 5

. No. 4. Tracklaying 10

KENT. Mechanical Engineer's Pocket-Book 5.00

KIDDER. Architect's and Builder's Pocket-Book. . 4.00

LOVELL. Practical Switchwork 1.50

McCORD. Mechanical Drawing, in 2 parts. Each.. 2.50

McGEE. Areas of Triangles 10

McGEE. Metrical Equivalents 50

MAHAN. Civil Engineering 5.00

MERRIMAN AND BROOKS. Hand-Book for Sur- veyors 2.00

MERRIMAN. Hydraulics, 5th Ed 4.00

MERRIMAN. Roofs and Bridges, A Text Book on.

Part I., Stresses in Simple Trusses.... 2.50

Part II., Graphic Statics 2.50

MERRIMAN AND JACOBY. Part III., Bridge Design. 5.00

MERRIMAN. Methods of Least Squares 2.00

MERRIMAN. Mechanics of Materials 4.00

MOORE. Tables for Irregular Cross Sections. Com- putation 1.25

NEWMAN. Scamping Tricks 1.00

OCKERSON. Mississippi River, From St. Louis to the

Sea. Paper, $3.00; Cloth, $4.00; Morocco 5.00

OSBORN. Tables of Moments of Inertia 3.00

OSBORN AND HYDE. Specifications for Metal High- way Bridge Superstructure 25

OSBORN AND HYDE. General Specifications for

Bridge Substructure 25

OSBORN AND HYDE. General Specifications for

Railway Bridges 25

PARSON. Landscape Gardening 3.50

PARSONS. Turnouts 25

PATTON. Civil Engineering 7.50

PATTON. Foundations 5.00.

PAUL. Railway Surveys and Resurveys 25

RAFTER AND BAKER. Sewage Disposal in the

United States 6.00

REA. Block Signaling 2.00

REID. Topographical Drawing and Sketching 5.00

REINHARDT. Lettering for Draughtsmen, Engi- neers and Students 1.00

RICHARDS. Compressed Air 1.50

RICHARDS. Centrifugal Pumps 1.00

ROCKWELL. Roads and Pavements in France 1.25

SEARLES. Field Engineering 3.00

SEARLES. The Railroad Spiral 1.50

SHAW. Municipal Government in Great Britain.. 2.00

SHAW. Municipal Government in Europe 2.50

SHUNK. Field Engineer 2.50

SMITH. Pocket Geologist and Mineralogist 1.00

SMITH. Topographical Drawing 2.50

SIEBERT AND BIGGIN. Modern Stone Cutting and

Masonry 1.50

SPALDING. Hydraulic Cements, Testing and Using 1.00

SPALDING. Roads and Pavements 2.00

STALEY AND PIERSON. Separate System of Sew- erage 3.00

PENCE. Stand Pipe Accidents and Failures 1.00

THACHER. Specifications for Highway Bridges... 25

THACHER. Specifications for Railroad Bridges 25

THOMSON. Specifications for Structural Steel for

R. R. Bridges 10

TORRE Y. Switch Layouts and Curve Easements. . 1.00

TRAUTWINE. Civil Engineer's Pocket-Book 5.00

TRAUTWINE. Excavations and Embankments V2.00

VEGA. Logarithmic Tables 2.25

WADDELL. Highway Bridge Specifications 50

WADDELL. Iron Highway Bridges 4.00

WADDELL. Live Loads for Railroad Bridges 25

WARING. Modern Methods of Sewage Disposal. . 2.00 WEGMANN. Masonry Dams, Design and Construc- tion of 5.00

WELLINGTON. Economic Theory of the Location

of Railways 5.00

WELLINGTON. Excavation and Embankments 4.00

WELLINGTON, BAKER AND PENNIMAN. Car

Lighting 1.00

WELLINGTON. Piles and Pile Driving, 2d Ed 1.00

WESTON. Cost of Laying Cast Iron Water Pipe,

2d Ed 25

WHEELER. Civil Engineering 4.00

WILSON. Irrigation Engineering 4.00

Any of the above books will be sent post paid on re- ceipt of price by

THE ENGINEERING NEWS PUBLISHING CO.

O,

LIBRARY

Due two

alter date.

118315