1975 ANNUAL REPORT 1976
%
O'SHAUGHNESSY DAM
FEB 2 8 1978
DOCUMENTS DEPT.
8.F. PV JLIC LIBRARY
HETCH HETCHY
WATER AND POWER
PUBLIC UTILITIES COMMISSION
<y-
CITY AND COUNTY OF SAN FRANCISCO
CITY AND COUNTY OF SAN FRANCISCO
PUBLIC UTILITIES COMMISSION
ANNUAL REPORT
FISCAL YEAR 1975-76
HETCH HETCHY WATER AND POWER SYSTEM
AND
BUREAU OF LIGHT, HEAT AND POWER
0. L. MOORE
GENERAL MANAGER
4 47610 SFPL: ECONO JR
36 SFPL 03/15/02 12
CITY AND COUNTY OF SAN FRANCISCO
GEORCE R. MOSCONE - MAYOR
PUBLIC UTILITIES COMMISSION
JOHN F. HEMNING, Jr
DENNIS V. CAREY
H. WELTON FLYNN
JOSEPH P. BYRNE
LYDIA LARSEN
JOHN D. CROWLEY
President
Vice President
Commissioner
Commissi oner
Commissioner
General Manager
ANNUAL REPORT
FISCAL YEAR 1975-76
HETCH HETCHY WATER AND POWER DEPARTMENT
ORAL L. MOORE - General Manager
This report is respectfully dedicated to
Hetch Hetchy employees, past and present,
whose devoted nnd conscientious efforts have
made possible these accomplishments for
San Francisco.
Digitized by the Internet Archive
in 2013
http://archive.org/details/4annualreportsanf
The picture on the front cover of 0' Shaughnessy Dam
was taken on June 7, 1923, before the dam was raised
an additional 85.5 feet.
In the 75th year since the first lands were acquired for the
Hetch Hetchy Water and Power system, and in the midst of a very
dry year, it is fitting to recognize the foresight, industry
and dedication of the people who conceived, built and operate
that system. One and three-quarter million San Francisco Bay
Area residents receive a supply of first quality water from
Iletch Hetchy. How did it all come about?
The Metropolitan Bay Area of 1901 consisted of a San Francisco
of 350,000 population, and a collection of small, quiet towns
around the Bay. Booming growth, a high level of civic pride,
and t he belief of every citizen that San Francisco was to be
the leading metropolis of the Pacific Coast were the keynotes
of the times.
Some dissatisfaction with the commercial supplier, the Spring
Valley Water Company, prevailed, occasioned by high rates,
periodic shortages and recurring water quality problems. That
dissatisfaction had prompted language in the Charter enacted
in 1900, setting as a goal the acquisition and construction of
a municipally owned water supply system. What was needed was
a plentiful, high-quality water source that would meet the
area's need for at least 100 years. Looking east to the Sierra
Nevada, the planners found such a source in Yosemite National
Park. But the water was 150 miles awayl
The "City that knows how" was determined that the water system
would be built, and the first land was purchased, and water
rights established, in 1901. The ensuing struggle for permis-
sion to build a dam in Hetch Hetchy valley went on for years.
When the United States Congress confirmed the City's right to
proceed in 1913, construction commenced on the largest such
project on the Pacific Coast up to that time. After 21 years,
and the expenditure of some $100 million, the first water
arrived at Crystal Springs Reservoir via the Hetch Hetchy
aqueduct in 1934. The drama surrounding the leadership, poli-
tics, and the engineering and construction effort involved in
the project would be worthy of an epic novel, as expansion of
the system to meet water and power demand continues down to the
present .
The large and complex system was designed to be built in incre-
ments as demand increased. The master plan concept of a full
gravity aqueduct system to Crystal Springs, established in 1912,
has been followed as the system has grown through the years to
the present capacity of 300 million gallons daily. As a by-
product of the falling water, hydroelectric generating capa-
bility of 340 megawatts has been constructed; a major economic
asset for San Francisco. Additional elements of the system are
planned for construction as the demand increases.
- 1
Today, the benefits of the Hetch Hetchy project are so matter-
of-factly accepted that the public has granted the system its
highest accolade: cheap, pure and plentiful water is taken for
grant cd !
2 -
:.
The last concrete in the original O'Shaughnessy Dam
construction was poured in April, 1923, bringing the
total to 398,000 cubic yards. The height of the dam
was 226.5 feet above the original streambed and 344.5
feet from the bottom of the foundation. It was 298
feet thick at the base and 15 feet at the top. At the
time it was constructed, it was the second highest dam
in the United States, Arrowrock in Idaho winning by
ten feet. Between 1934 and 1938 it was raised an
additional 85.5 feet.
HIGHLIGHTS
Financially, the outcome of Hctch Hetchy's Water and Power
system operation for 1975-76 was influenced by two major events
which occurred during the year - one man-made and the other
the result of a natural occurrence.
Breakdown of wage negotiations for the upcoming fiscal year
between City's crafts workers and the Board of Supervisors
resulted in a 38-day strike by City employees including electri-
cians, plumbers, carpenters, laborers, street cleaners, etc.
who are members of the crafts union. The strike began March
31, 1 (.l 7 6 and ended on May 8, 1976. The public transit system
was quickly brought to a halt when the Municipal Railway drivers
joined the strike at the very outset. The importance of the
Hetch Hetchy Water and Power system operation to the success or
failure of the strike was not to be overlooked. It, too, was
forced to shut down with all hydroelectric generators stopping
production at 1400 hours on April 2, followed by complete
cessation of water delivery to the San Francisco Water Depart-
ment for domestic purposes.
The drought brought on by the lack of precipitation in the
winter of 1975-76, resulting in the smallest snow melt runoff
from the Hetch Hetchy, Cherry and Eleanor Watersheds in the 59
years of record, has left the three reservoirs at less than
601 full at the end of the report year. In order to conserve
as much water as possible for domestic use in the Bay Area, the
average daily power draft at Kirkwood and Moccasin Powerhouses
beginning June 1, 1976, was reduced to 300 million gallons per
day to coincide with the Hetch Hetchy Aqueduct capacity and the
anticipated San Francisco Water Department demand for the next
several months. In addition, the power draft at Holm Powerhouse
was reduced to 200 cubic feet per second in order to conserve
water at Lake Lloyd so that, if later conditions require, such
water can be directed into the Hetch Hetchy Aqueduct.
Ill Till HETCHY ORGANIZATION AND FUNCTIONS
Under policies established by the San Francisco Public Utilities
Commission, the HETCII HETCHY WATER AND POWER DEPARTMENT and the
BUREAU OF LI CUT, HEAT AND POWER serve the City and County of
San Francisco in the dual function of operating department and
service bureau.
Iletch Iletchy is a municipally-owned system of storage reservoirs
and aqueducts which collects water from the Tuolumne River
watershed and delivers it to the San Francisco Water Department.
As a by-product of falling water, Hetch Hetchy operates and
maintains hydroelectric generating stations and high voltage
transmission lines for the production and distribution of elec-
tric energy.
Through its Transit Power Division, Hetch Hetchy has funded,
operated, maintained and provided improvements for the electric
facilities of the San Francisco Municipal Railway since July 1,
1969.
In order to handle this additional responsibility, Hetch Hetchy
assumed control of the equipment and personnel of the Overhead
Lines and Motive Power Sections of the Municipal Railway.
All of Hetch Hetchy' s expenses, including those of the Transit
Power Division, are supported by water and power revenues.
The Bureau of Light, Heat and Power administers contracts for
furnishing electric, gas and steam services to municipal depart-
ments and handles monthly billings. It also administers con-
tracts for furnishing street lighting services and for operation
and maintenance of City-owned street lighting. Financing,
design and construction of City-owned street lighting improve-
ments are under the jurisdiction of the Department of Public
Works, and plans for these improvements must be approved by the
Public Utilities Commission through this Bureau. The Bureau is
financed by appropriations from municipal departments and gas
tax funds.
For fiscal year 1975-76, the Department administered budgeted
funds for all purposes as follows:
Budget
Hetch Hetchy Water and Power
Hetch Hetchy Water and Power
(Transit Power Division)
Bureau of Light, Heat and Power
Number
of
Total Amount
Employees
Appropriated
219
$ 21,350,716
52
4,505,194
11
9,493,990
282
$ 35,349,900
0' Shaughnessy Dam as it looks now.
PLANS FOR THE NliAR FUTURE
Finns for future Ilctcli Hetchy construction are included in the
City's current Capita] Improvement Plan.
Projects which will be added next year will include the
following:
Cherry Eleanor Pumping Station
We have studied the possibility of installing pumps at the
Cherry end of the Cherry Eleanor Tunnel. This study determined
that it was economically feasible to capture, for electrical
generation, water which presently spills at Lake Eleanor during
the runoff season. Preliminary design work will commence this
year, while the necessary permits and approvals are being
obtained.
Moccasin Powerhouse Bypass
Studies are planned to make improvements on Rattlesnake Creek
and Rig Jackass Creek to permit the discharge of water from
Priest Reservoir into the fletch Hetchy Aqueduct for use in
times of emergency when Moccasin Powerhouse is not operative.
7 -
HETCH 1IETCHY WATER AND POWER SYSTEM
REVENUE AND EXPENDITURES
Revenue from Ketch Ketchy Water and Power operations is derived
principally from two sources:
1. Sale of electric power and energy to San Francisco Municipal
departments, Modesto and Turlock Irrigation Districts in
the San Joaquin Valley, and seven industrial customers.
Kaiser Cement f( Gypsum Corporation Santa Clara County
Kaiser Aluminum d, Chemical Corporation Santa Clara County
Lockheed Missiles and Space Company, Santa Clara County
Tnc .
General Motors Corporation Alameda County
IBM Corporation Santa Clara County
Liquid Air, Inc. Alameda County
Norris Industries, Riverbank Stanislaus County
2. Sale of water to the San Francisco Water Department.
POWER SALES
Gross sale of electric energy amounted to $20,224,183, up from
$18,484,718 during 1974-75. Although this revenue appears to
be a new record, it does not have the same significance as the
record revenue of last year. The reasons are not so obvious
without knowing the following:
(1) Much of the increase is due to the very large amount
of supplementary power and energy which City had to
purchase for resale and which was resold to the
customers at substantially the same high price at
which it was purchased.
(2) The offset to last year's record revenue in terms of
expenditure for supplementary power and energy was
only $99,734, whereas this year the offset is
$4,389,319. Therefore, from the standpoint of net
earnings, the department finds itself in a much less
profitable financial position than that of last year.
Power and energy delivered to all City Departments increased
1.9% over the previous year, mainly the result of increased
consumption at the San Francisco General Hospital where addi-
tional power for construction of the new facilities nearly
doubled the total requirements of 11,091,942 kilowatthours for
1974-75. Consumption at the Airport, usually the single largest
energy consumer among the City departments, has remained sub-
stantially the same as 1974-75. The requirements for the San
Francisco Water Department have again increased 9.31, reflecting
more pumping required by the drought condition. The Municipal
Railway showed a decrease of 12.21 in annual consumption over
the previous year, largely as a result of the Muni shutdown
during the City employees' strike.
Power and energy delivered to Modesto Irrigation District,
Hetch Hetchy's largest power customer, and to Turlock Irrigation
District, the third largest, increased by 17.71 and 13.6%
respectively this year. These increases in purchases clearly
reflect the dry year operation of the Districts' own plant where
power is derived from water stored behind Don Pedro Dam.
The hope of exceeding the record generation of 1974-75 was
effectively shattered by the drought and the strike. Instead,
the opposite was achieved with the lowest production recorded
in seven years of operation of the present project. By
comparison, the 1975-76 total output of 1,640,671,000 kilowatt-
hours is 20% less than the record output of 2,057,609,000
kilowatthours for 1974-75.
Hetch Hetchy power is sold to City Departments at cost, repre-
senting a saving to taxpayers for 1975-76 of approximately $3.2
million compared to the cost if supplied by the local investor-
owned utility.
One of the benefits resulting from the June 24, 1975 Amendment
Agreement witli the Pacific Cas and Electric Company for wheeling
Hetch Hetchy power to City's municipal customers was the reduc-
tion in energy which City has to supply to compensate the
Company for losses incurred in transmission and distribution.
The data for 1975-76 indicates that 33,248,681 kilowatthours
was delivered to the Company for this purpose, almost 41,000,000
kilowatthours less than that required under the old agreements.
This reduction in losses when sold to industrial customers at
prices effective during the year returned to the City additional
revenue in excess of $650,000.
In last year's annual report, it was estimated that the new
electric power rates which were scheduled to go into effect
July, 1975 would increase Hetch Hetchy's power revenue for 1975-
76 from sales to the municipal customers (including resale to
Airport tenants) by one million dollars. Comparison of results
for 1974-75 and 1975-76 has confirmed the accuracy of this
prognostication. Another revision of the rates is scheduled
for action by the Public Utilities Commission in July 1976.
Adoption of the proposed rates will boost revenue from sales to
private consumers and municipal users another $900,000 in the
upcoming fiscal year.
August 1975 marked the first month of higher rates for Hetch
Hetchy power sold to the Modesto and Turlock Irrigation Districts
under signed agreements with them dated May 22, 1973 and
November 6, 1972 respectively.
WATER SALES
This past year, revenue from sale of water and standby service
to the San Francisco Water Department was $6,550,000, $428,000
less than cost to Hetch Iletchy.
- 10 -
Miscelloneous
Revenue
$ 187,307
6.5(
Bond Inte rest
ond Redemption
$ 8,640, 856
Copitol Improvement
Hetch Metchy Project
$ 326, 341
HETCH HETCHY REVENUES
AND EXPENDITURES
FISCAL YEAR 1975-76
M
CO
en
ID
o
:e
i
\—
\—
<t
=s
o
_i
20-
cc
10
5-
o-
SUPPLEMENTAL
1966 1967 1968 1969 1970 1971 1972 1973 1974 1975 1976
( Year Ending June 30 )
HETCH HETCHY POWER SYSTEM OUTPUT
20-
CO
o
o
o
CO
o
15
10-
5-
1966 1967 1968 1969 1970 1971 1972 1973 1974 1975 1976
( Year Ending June 30 )
REVENUE FROM SALE OF ELECTRIC ENERGY
12
WATLR PRODUCTION AND TRANSMISSION
Prcci pitation recorded for the year at our measuring stations
was 58°6 of the long term average.
During the year, 70,086,900,000 gallons of water were diverted
from the Tuolumne River watershed through the Hetch Hetchy
Aqueduct to the San Francisco Water Department, representing
71" oT the City's total customer consumption. In addition,
237,693,456 gallons were delivered to the United States
Atomic Lnergy Commission at Mocho Shaft of the City's Coast
Range Tunnel for use at the Lawrence Radiation Laboratory at
Livermore; 49,306,396 gallons were delivered to Groveland
Community Service District in Tuolumne County from the Mountain
Tunnel .
Appendix Table 6 shows comparative data on precipitation,
runoff, storage and delivery of the Hetch Hetchy Water Supply
System.
300,000
CO
o
i—
a
UJ
cc
200,000
100,000 —
cc
0 —
1 1971 -72 ' 1972-73 ' 1973-74 ' 1974 -75 ' 1975-76 '
DELIVERIES OF WATER TO
SAN FRANCISCO WATER DEPARTMENT
13
Woodrow Wilson, President of the United States,
presented this plaque to the Honorable James Rolph,
Jr., Mayor of San Francisco, expressing his support
and enthusiasm for the Hetch Hetchy Act.
OF] R MING AND MAINTENANCE - MOCCASIN DIVISION
IIPI.M POWERHOUSE UNIT NO. 2 GENERATOR
At approximately D842 hours on Sunday, January 25, 1976, the
13,800 volt stator winding of Generator No. 2 at Dion R. Holm
Powerhouse failed. Preliminary investigation indicated that
approximately 8 of the 216 coils had heen damaged. However,
detailed examination following removal of the rotor assembly
disclosed that a total of 16 coils would have to be replaced.
Several of these coils were still functional, but dc high
voltage testing showed that they would probably fail in a short
time and were therefore deemed unacceptable for continued use.
Portions of insulation on 4 field poles were also damaged by
hot metal splatters from the stator windings when the failure
occurred, requiring re-insulation of the affected area. All
repair work was performed by departmental personnel, with
supervision provided by the field engineers from All is-Chalmers ,
the generator manufacturer. The repairs were completed and the
generating unit returned to service by the middle of March.
A board of inquiry consisting of the senior electrical engi-
neering staff members was formed to investigate the failure for
cause and to recommend corrective measures. A final report is
expected to include analyses and possible solutions to this
maintenance problem whereby the reliability of the equipment
can be improved .
CHERRY DAM HOI, LOW JET VALVE RliPAIRS
The Machine Shop repaired one of the two 60 -inch valves used to
release water from Lake Lloyd. The valve was leaking badly and
water had gotten into the operating mechanism. If allowed to
remain in place, it would have been necessary to replace the
valve in a short period of time. It was necessary to build up
and machine the body and plug seats, replace a brass bushing,
a leather packing and two thrust bearings. Other miscellaneous
repairs were made to broken or defective parts. The Mechanical
I.ngineering Section provided engineering and procurement assis-
tance to the Machine Shop, including inspection of work done to
the plug seat by a local shop. At the end of the fiscal year,
repairs were nearing completion and the valve will be available
for use during the next runoff season.
LARNER JOHNSON RliLI EF VALVE NO. 2 AT SAN JOAQUIN VALVE HOUSE
The relief valve on Pipeline No. 2 at the San Joaquin Valve
House was removed from service during pipe cleaning and painting
(HH-511R). The machine shop used this time to completely
rebuild the valve including braising and remachining the seats.
- 15 -
The old Moccasin Powerhouse completed June, 1925
The new Moccasin Powerhouse completed May 20, 1969,
Oril RAT I ON AND MAINTENANCE - TRANSIT POWER DIVISION
The Transit Tower Division is responsible for supplying the 600
volt direct current power that is necessary to operate the
strertcars and trolley coaches of the San Francisco Municipal
Ra i 1 way .
The Transit Power Division is composed of two sections - the
Motive Power Section and the Overhead Lines Section.
Motive Power Section
11!
The Motive Power Section operates and maintains seven sub-
stations which convert electric power from 12,000 volts
alternating current to 600 volts direct current by means of
motor-generators, synchronous converters, and mercury arc
rectifiers. (See Appendix Table 3 for statistical data.)
Motive Power is also responsible for maintaining the electric
motors and associated control equipment for operating the
cable-winding machinery located in the Cable Car Powerhouse at
Washington and Mason Streets. In addition, Motive Power does
periodic inspection, cleaning, adjusting and repairing the
streetcar and trolley coach recorders at Central Control of the
Municipal Railway. The substations operate 24 hours per day,
36 5 days per year.
In anticipation of the need to assume responsibility for eigh-
teen new substations, this section perused and commented on the
wiring and control schemes proposed for these stations.
A new mimic board showing the new stations in schematic form
was constructed and installed at the Rryant Substation. As new
automatic stations are completed and become operational, they
will be monitored and controlled from this remote location.
Since Outer Mission and West Portal Stations are presently
unmanned, controls for these stations were designed and
installed on this new mimic hoard. This new status display
and control board will continually be augmented with new
automatic station controls until such time as it shall be super-
seded by a more sophisticated and flexible Supervisory Control
System.
Overhead Lines Section
The primary function of the Overhead Lines Section is to main-
tain in satisfactory operating condition the trolley wire over-
head facilities and the electric distribution system which
conveys power to it. This electric distribution system consists
of both overhead lines and underground cables.
17 -
Secondary functions include the maintenance of the Municipal
Railway Signal Systems and the electric light and power systems
of all Municipal Railway buildings.
During the fiscal year 1975-76, the Overhead Lines Section
responded to 3606 emergency calls. In addition to emergency
calls, this section had a regular and extensive maintenance
program for overhauling all overhead and underground facilities.
This section operated with three shifts per day, seven days a
week. Monday through Friday, the normal workday shift was from
8:00 a.m. to 3:30 p.m. with a two-man emergency crew on the
"swing" or evening shift (3:30 p.m. -10:30 p.m.) and the grave-
yard shift (1:00 a.m. -8:00 a.m.).
On Saturdays, Sundays and holidays a two-man emergency crew was
available on each of the three eight-hour shifts; midnight to
8:00 a.m., 8:00 a.m. to 4:00 p.m., and 4:00 p.m. to midnight.
Overhead and underground facilities were systematically
inspected, and worn or damaged parts were replaced before they
could cause accidents or malfunction of equipment.
A considerable amount of damage to overhead facilities was
caused by trolley coaches de-wiring and snagging their poles in
the overhead facilities and tearing them down, or by breaking
the spans with the flaying poles. Such damage was repaired at
no cost to the Municipal Railway. Other parties who damaged
our facilities were billed for the cost of repairs. This
included damage to overhead facilities caused by high loads on
trucks or careless operation of crane equipment and damage to
underground feeder cables by contractors digging into our duct
lines. During 1975-76, responsible parties were billed for 7
damage cases totalling $3,728.53. The Overhead Lines Section
also performed work for building owners and contractors under
work orders amounting to 18 jobs totalling $44,183.13. This
work included moving trolley poles to accommodate driveways;
relocating trolley poles and feeders to permit construction of
new buildings; temporarily removing trolley wires and feeders
to permit passage of high loads: and shifting of trolley wires
and feeders for various excavations.
The Overhead Lines Section engaged in many other activities of
a related nature which it is especially equipped to perform.
These additional, duties included repairs, maintenance and
construction of electrical systems in Muni's car barns, offices
and shops ; welding and rebuilding of worn overhead lines special
work; making and rebuilding parts for switches, warning block
signals, car recorders, and strand alarms for the cable car
system; installing mobile radio equipment; installing streetcar
and bus stop signs and public information signs.
In Marcli 1976 the section curtailed operations for a six week
period during a labor dispute involving city Craft workers.
1« -
Mr. 0' Shaughnessy, City Engineer, inspecting
project on August 11, 1918.
ENGINEERING DIVISION
The Engineering Division of Hetch Hetcliy Water and Power provides
engineering services for the Hetch Hetchy Project and the Transit
Power Division. These services include the preparation of
studies, reports, cost estimates, and plans and specifications
for new construction, for replacement of structures and for items
of major maintenance. Surveying, inspection of construction,
contract administration and payment recommendations are provided
for all construction work under Hetch Hetchy Water and Power.
Work of unusual magnitude or which requires special knowledge
and expertise is done by engineering consulting firms which have
the necessary manpower and qualifications. The Engineering
Division is organized into five main sections: Structural and
Civil, Electrical, Mechanical, Architectural, and Construction.
During the year, plans and specifications were prepared for the
following work to facilitate and maintain Hetch Hetchy operations:
III' -4 5 4 - Reconstruct Moccasin Sewage Disposal System.
A package sewage treatment plant producing an odorless effluent
and sludge has been planned to replace the existing septic tank
system. This project is a carryover from last year due to the
slowness to acquire approval for the Federal "Clean Water Grant"
which we reapplied for last year. Conceptual approval has been
received. The EIR and the Project Report received approval from
the State Water Resources Control Board, and we are now awaiting
Federal EPA approval. The Hughes site for the effluent sprinkler
field was purchased during the year.
HH-4 77 - Moccasin Penstock Valve House.
A contract was let for the construction of a steel frame struc-
ture to enclose the butterfly valves at the head of Moccasin
Penstock. This structure will provide protection and security
for the valves.
HH- 511R - San Joaquin Pipeline No. 2, Repair Lining.
A contract was let for cleaning the interior of the pipe and
applying a coal-tar lining. This work was necessary because
the existing cement mortar lining, which protects the steel pipe
from corrosion, has been softened by action of the soft water
and the invert is being eroded away.
HH-512 - San Joaquin River Valve House, Repairs and Piping.
Under this contract, which was completed during the year, new
sump pumps and related piping were installed at the San Joaquin
River Valve House. Also, under this contract, a leaking manifold
at the valve house was repaired.
:o -
The Supervisors' inspection party on Red Mountain
Bar Cableway - July 14, 1927.
HH- 51 4 - Moccasin Administration Building, Replace Heating
System.
The plans and specifications to replace the existing oil burning
steam heating system and bring the electrical service at the
building up to code were completed and bids opened this year.
The existing heating system had become expensive to maintain
and operate because of its age and its use of fuel oil. The
replacement of the oil by electric heating necessitated increas-
ing the capacity of the building electrical system, and improv-
ing it to meet code requirements.
HH-539 - Repair and Taint Concrete Trolley Poles (Van Ness
Avenue) .
A contract has been let to repair and paint concrete trolley
poles on Van Ness Avenue. This work is part of a program to
rehabilitate all trolley poles in the City.
HH- 545 - Repair, Reroof Hetch Hetchy Buildings, Moccasin and
Early Intake.
A contract was let for the reroofing of the Machine Shop and
five (5) cottages at Moccasin; reroofing Kirkwood Powerhouse at
Parly Intake, and replacement of parapet flashing and construc-
tion of joint flashing at Holm Poiverhouse near Parly Intake.
HH- 5 5 5 - Replace, Repair and Paint Steel Trolley Poles (Mission
Street) .
Contract plans and specifications have been completed to
replace, repair and paint steel trolley poles on Mission Street.
The contract is scheduled to start in September 1976. This
work is part of a continuing program to rehabilitate all trolley
poles in the City.
HH-554 - Construction of #47 Trolley Coach Loop at Army Street.
At the request of the Municipal Railway, a contract was let to
restore the terminal loop of the #47 trolley coach line to Army
Street. Several years ago the route was shorted to turn back
at 25th Street in order to facilitate the construction of the
freeway interchange at Army Street and Potrero Avenue. The
Department of Public Works funded the project.
HH- 5 56 - Claribel Lateral Timber Bridge.
A contract was let for the construction of a timber bridge to
replace an existing wood plank bridge across the Oakdale
Irrigation District's lateral that has collapsed. The bridge
provides access for maintenance and inspection along our right-
of-way.
- 22 -
The Honorable James Rolph, Jr., Mayor, and City Engineer
M. M. 0' Shaughnessy and party at holing through of the
Foot Hill Tunnel on January 5, 1934.
HH-564 - Moccasin and Tesla Portal Buildings - Exterior Repair,
Painting and Roof Preservative
A contract was let for exterior repair and painting of fourteen
(14) cottages at Moccasin and caretaker's cottage at Tesla
Portal including painting of Chlorinator, Pumphouse and Generator
Buildings. This work also includes roof repair and painting of
the vehicle storage shed at Moccasin.
Market Street Reconstruction
Plans and specifications for relocation of trolley wires on
Market Street were prepared for inclusion in various DPW
contracts for reconstruction of Market Street.
- 24
View looking downstream, showing the flume intake
in the temporary cofferdam across Moccasin Creek,
above the location of the downstream dam of the
Moccasin Reservoir, July 14, 1927.
The completed Moccasin Spillway at the approximate
site of the Diversion Flume Reconstruction completed
March 18, 1976.
POWER IMPROVEMENT PROGRAM
Work during Fiscal Year 1975-70 under the UMTA-approved Federal
Grant for the Power Improvement Program was as follows:
1. Grant Amendments
Based on our application submitted in February 1975, and
updated in November 1975, Amendment No. 1, increasing the
total Project Cost from $29.6 to $38.4 million and the
Federal Grant from $19.8 to $26.8 million, was approved by
UMTA on May 20, 1976. The additional funds were approved
to cover increased costs due to inflation and revised Project
requirements for the current fiscal year. An additional
amendment to provide sufficient funds for the balance of the
Project, increasing the total Project cost to $50.5 million
and the Federal Grant to $36.5 million, is currently in the
final stages of approval by UMTA and is expected in July
1976.
2 . Electrification Project
A) Contracts
Construction commenced on Contract HH-521, Market Street
Subway Electrification, Embarcadero Station to Duboce
Portal on July 14, 1975. Bids were received on July 9,
1975 on Contract MR-622, Twin Peaks Tunnel Electrifica-
tion, Structural Repairs and Improvements. Due to
irregularities in the low bid and claim of the low bidder
of ambiguity on the application of the San Francisco
Plan, the Public Utilities Commission on July 29, 1975
voted to reject all bids and readvertise. The contract
was readvertised as Contract MR-622R and bids were
received on August 27, 1975. The contract was awarded
on September 10, 1975 to Abbett Electric Corporation,
San Francisco, California, who submitted the low bid of
$3,022,910, which includes an amount of $1,416,422 for
the Power Improvement Program portion of the contract.
The contract was certified by the City Controller on
October 10, 1975. Construction commenced on October 27,
1975.
Plans and specifications for Contract HH-531, Market
Street Subway F.l ectrif ication , Duboce Junction to Eureka
Station, were approved by UMTA. Bids were received on
February 26, 1976. The contract was awarded on March 9,
1976 to Amelco Electric, San Francisco, California, who
submitted the low bid of $195,428. The contract was
certified by the City Controller on April 12, 1976.
Construction commenced on April 26, 1976.
26 -
B) Oesign Services
The consultant, PBQ5D, Inc. and Gibbs 5 Hill, Inc.
(PBGII) continued work on final design contract plans
and specifications.
Contract plans and specifications for the PIP and TIP
portions of Contract HH-536, Streetcar Overhead System,
West Portal Avenue, Conversion for Pantograph Operation,
and Related Street Lighting Work were completed and will
be transmitted to UMTA for approval in July. This con-
tract is scheduled for advertising in July 1976.
Plans and specifications at the 9 5% completion level to
be incorporated into purchase orders for special Trolley
Coach Streetcar Crossing Hardware were submitted by the
consultant. Review was completed and comments were
transmitted to the consultant for incorporation into
final documents. The special hardware will be purchased
by the City, due to the 6-month manufacturing lead time,
and will be furnished to several installation contractors.
Plans and specifications at the 95% completion level for
the streetcar overhead system conversion for pantograph
operation for Contracts HH-524 ("K" Line), HH-532
("N" Line), HH-533 ("J" Line), HH-534 ("L" Line), and
HH-535 ("M" Line) were submitted by the consultant, and
are being reviewed for final completion.
Plans and specifications at the 60% completion level for
streetcar overhead system conversion for pantograph
operation for Contract HH-530 ("J" £ "N" Lines, Duboce
Portal) were submitted by the consultant. Review was
completed and comments were transmitted to the consultant
for incorporation into the 95% completion level submittal
clue in July 1.976.
Amendment No. 1 to the existing professional services
agreement, approved by the PUC on June 24, 1975, was
approved by UMTA on Scptmcber 5, 1975. This amendment
was executed by the consultant, PBGH, on September 19,
1975 and certified by the City Controller on October 27,
1975.
C) Cable Purchase
Orders were placed with Cyprus Wire and Cable Co., South
San Franicsco, California for insulated copper feeder
cable to be furnished as required under the $3,151,452
purchase contract. A total of 325,000 feet of the five
types of cable, having a value of $800,000, was received
2 7
during the fiscal year and delivered to the installation
contractors for the Market Street Subway and Twin Peaks
Tunnel electrification contracts, and for the Downtown,
Civic ("enter and Church Substations equipment installa-
tion contract. An additional 85,000 feet of cable was
ordered but not received as yet, for other substation
and feeder undergrounding contracts.
5 . Substation Project
A) Contracts
Plans and specifications for Contract HH-522, Civic
Center, Church and Downtown Substations, Installation of
Electrical Equipment, were approved by UMTA on July 21,
1975. Bids were received on August 14, 1975. The
contract was awarded on August 28, 1975 to De Narde
Construction Company, who submitted the low bid of
$652,990. The contract was certified by the Controller
on September 17, 1975. Construction commenced on
October 6, 1975.
Plans and specifications for Contract HH-528, Laguna
Honda and Judah Substations, Construct Buildings and
Install Equipment, were completed and transmitted to
UMTA for approval on October 28, 1975. The plans and
specifications were approved by UMTA on November 11,
1975 and bids were received on December 11, 1975. The
contract was awarded on January 8, 1976 to Herrero
Brothers, Inc. who submitted the low bid of $567,913.
The contract was certified by the City Controller on
February 5, 1976. Construction commenced on March 1,
1976. Plans and specifications for Contract HH-529,
Carl Substation, Construct Building and Install Equip-
ment, were completed and transmitted to UMTA for approval
on February 25, 1976. The plans and specifications were
approved by UMTA. on March 9, 1976. Bids were received
on April 1, 1976. The contract was awarded on April 27,
1976 to S.J. Amoroso Construction Co., Inc., Foster City,
California, who submitted the low bid of $597,800.
The contract was certified by the City Controller on
June 9, 1976. Construction is scheduled to start early
in July, following issuance of a building permit by the
Department of Public Works.
Tlans and specifications for Contract HIT- 5 4 4, Fillmore
Substation, Construct Building and Install Equipment,
were completed and transmitted to UMTA for approval on
May 26, 1976. The plans and specifications were approved
by UMTA on June 4, 1976. The contract was advertised
with bids scheduled to be received on July 15, 1976.
H ) Design Services
The Consultant Bechtel , Inc. continued design work on
the substation buildings and equipment installation.
Final plans and specifications for Contract IIH-545,
Outer Mission Substation, Install Equipment, were com-
pleted by the consultant.
Final plans and specifications for Contract HH-547, San
Jose Substation, Install Equipment, were completed by
the consultant.
Plans and specifications at the 85°6 completion level for
Contract 1111-540, Randolph Substation, Construct Building
and Install Equipment, were submitted by the consultant.
Review was completed and comments were transmitted to the
consultant for incorporation into the final documents.
Plans and specifications at the 85% completion level for
Contract IIH-548, Taraval Substation, Construct Building
and Install Equipment, were submitted by the consultant
and arc being reviewed for final completion.
Plans and specifications at the 8 5% completion level for
Contract 1111-550, West Portal Substation, Install Equip-
ment, were submitted by the consultant and are being
reviewed for final completion.
Amendment No. 2 to the existing Professional Services
Agreements, approved by the Public Utilities Commission
on May 27, 1975, was approved by UMTA on July 17, 1975.
This amendment was certified by the City Controller on
September 10, 1975.
Amendment. No. 3 to the Existing Professional Services
Agreement was negotiated with the consultant. The amend-
ment, which provides for additional services in the
review of drawing submittals from the substation equip-
ment manufacturer, I-T-E Imperial Corporation, was
approved by the Public Utilities Commission on November
25, 1975, and was transmitted to UMTA for approval on
November 18, 1975.
Amendment No. 4 to the existing Professional Services
Agreement was negotiated with the consultant. The
amendment, which provides for additional design services
for Fillmore, Taraval and Bryant Substations, was
approved by the Public Utilities Commission on December 9,
1975, and was transmitted to UMTA for approval on
December 11, 1975.
- 29
Amendments No. 3 and 4 were approved by UMTA on February
4, 1976 and January 21, 1976, respectively, and were
certified by the City Controller on February 9, 1976.
The consultant continued design work on Bryant and
Richmond Substations (Contracts HH-549 and HH-551).
Building design for tbe relocated Taraval Substation
received Phase I and Phase II approval from the San
Francisco Art Commission. Final approval (Phase III)
was received for three substations: Fillmore, Randolph
and Taraval. Tin's completes Art Commission approval on
all six substation buildings.
C) Substation Sites
The use of either of two alternative sites for Taraval
Substation was approved by City Planning on July 10,
1975 as conforming to the Master Plan. Appraisals on
both sites were completed. An Offer to Sell the pre-
ferred alternate site was received from the owner. A
resolution authorizing the acquisition of the property
from Northern Counties Title Company was adopted by the
PUC on September 10, 1975. A resolution approving
acquisition of the property was adopted by the Board of
Supervisors on October 6, 1975. The deed granting the
property to the City and County of San Francisco was
recorded on October 29, 1975.
A resolution authorizing the acquisition of an easement
from the Pacific Gas and Electric Company for the
Randolph Substation was adopted by the PUC on July 29,
1975. On September 2, 1975, the Board of Supervisors
adopted a resolution approving the acquisition of the
easement. The deed granting the easement to the City
and County of San Francisco was recorded on October 3,
1975.
A resolution authorizing acquisition of property from
the San Francisco Redevelopment Agency for the Fillmore
Substation site was adopted by the Public Utilities
Commission on April 27, 1976. On June 7, 1976, the Board
of Supervisors adopted a resolution approving the acqui-
sition of the property. The deed conveying the property
to the City and County of San Francisco was executed by
the San Francisco Redevelopment Agency on June 8, 1976
and was deposited in escrow on June 28, 1976. The deed
will be recorded in July 1976.
- 30
With the recording of the deed for the Fillmore Substation
site, all property acquisition for the six new substation
buildings will be completed.
D) Iiquipment Purchase
The substation equipment manufacturer, I-T-E Imperial
Corporation, continued production on the $5,896,000
purchase contract.
Review of shop drawings submitted by ITE continued.
Modification of Contract No. 1, covering changes to
Laguna Honda Substation equipment was processed. Modifi-
cation of Contract No. 2, covering changes to the gap
breakers and providing for local warehousing of sub-
station equipment was processed.
Deliveries of equipment commenced. Equipment for the Gap
Breaker Stations at Eureka and Forest Hill was delivered
to the Contractor, Abbett Electric, at the jobsite
(Contract MR-622R) on January 27, 1976, and for the Gap
Breaker Stations at Powell and Van Ness was delivered to
the Contractor, Amelco Electric, at the jobsite (Contract
HH-521) on February 5, 1976. Equipment for the first
stage of construction at Downtown Substation was received
for installation by the Contractor, De Narde Construction
Co., on February 19 and 20, 1976, and equipment for Church
Substation was received for installation by the Contractor,
De Narde Construction Co., on March 16, 1976 and lowered
through the street hatch into the substation (Contract
HH-522). The equipment for Civic Center Substation was
received and lowered into the station through the roof
hatch opening at the U.N. Plaza on June 8, 1976. Addi-
tional equipment is being received at the local warehouse
for later deliveries to installation contractors.
Approximately 60% of the contract equipment is now on
hand.
A Service Engineer, assigned by ITE to assist during
installation and testing of the new equipment, provided
assistance at the four Gap Breaker Stations and at
Downtown, Civic Center and Church Substations.
Work commenced on the preparation of plans and specifica-
tions for the purchase of additional substation equipment
for Stations E, F, J, and N. The recently approved
amendment to the Power Improvement Program provides for
the acquisition and rehabilitation of these substations,
now owned by the Pacific Gas and Electric Company.
31
Control and Communication Project
The Consultant, Systems Control, Inc., had submitted the
preliminary report in June 197S. Review was completed on
the alternate systems designs presented in the preliminary
report. The choice of design was made by Hetch Hetchy. The
consultant was directed to proceed with detailed design.
The consultant delivered the Supervisory Control System
specifications, at the 30% completion level, for review. In
addition, the consultant submitted the design criteria for
the subway maintenance telephone system for approval. Review
of the submittals and design criteria was completed by Hetch
Hetchy. The consultant was notified to proceed with prepara-
tion of final plans and specifications.
The 901 completion level submittal is scheduled for August
1976.
Feeder Underground ing
A) United Nations Plaza (DPW Contract 23,476)
All PIP work on this contract was completed in accordance
with the contract plans and specifications on September
25, 1975.
B) Judah Street (DPW Contract 23,506)
All PIP work on this contract was completed in accordance
with the contract plans and specifications.
C) Ocean Avenue and Phelan Avenue Rechannelization and
Track Reconstruction (DPW Contract 23,7277
Plans and specifications for the TIP and PIP portions of
DPW Contract 23,727 for Ocean and Phelan Avenues
Rechannelization, which will include relocation of
trolley poles and the overhead trolley wire system and
the undergrounding of feeder cables, along with Muni
streetcar track relocation and rerailing, were approved
by UMTA on April 7, 1976. The plans and specifications
were approved by the State (FAU) on June 4, 1976. The
contract was advertised on June 29, 1976 with bids
scheduled to be received on August 4, 1976.
D) Fillmore Street, Hayes to Pine Streets, Underground Power
Facilities (Contract HH-491)
All work on this contract was completed in accordance
with contract plans and specifications.
32
E ) Ocean Avon ue , Junipc ro Serra Boulevard to Harold Avenue
Underground Duct System (Contract HH-502)
All work on this contract was completed in accordance
with contract plans and specifications.
F) 19th Avenue, Randolph and Broad Street - Underground
Duct System (Contract 1111-519)
All work on this contract was completed in accordance
with contract plans and specifications on October 24,
1975.
G) Church Street - 22nd Street to 30th Street - Underground
Duct System (Contract HH-497J
Plans and specifications for constructing manholes and
underground duct banks in Church Street between 22nd
Street and 30th Street were completed and transmitted to
UMTA for approval on November 13, 1975. The plans and
specifications were approved by UMTA on December 9, 1975,
The contract was awarded on January 13, 1976 to Abbett
Electric Corporation, San Francisco, California who
submitted the low bid of $109,590. The contract was
certified by the City Controller on February 4, 1976.
Construction commenced on February 16, 1976.
H) Taraval Street and 46th Avenue - 20th Avenue to Vicente
Street - Underground Duct System (Contract HH-503)
Plans and specifications for constructing manholes and
underground duct banks in Taraval Street and 46th Avenue
between 20th Avenue and Vicente Street, were completed
and transmitted to UMTA for approval on October 28, 1975,
The plans and specifications were approved by UMTA on
November 5, 1975. Bids were received on January 15,
1976. The contract was awarded on January 27, 1976 to
Peter Kiewit Sons' Company who submitted the low bid of
$246,200. The contract was certified by the City
Controller on March 9, 1976. Construction commenced on
March 29, 1976.
I ) Sutter Street - Presidio Avenue to Leavenworth
Underground Duct System (Contract HH-521T)
Plans and specifications for constructing manholes and
underground duct banks in Sutter Street between Presidio
Avenue and Leavenworth were completed and transmitted to
UMTA for approval on September 4, 1975. The plans and
specifications were approved by UMTA on September 16,
1975. Bids were received on November 13, 1975. The
33
contract was awarded on November 25, 1975 to R. Flatland '
Company, San Mateo, California, who submitted the low
bid of $372,835. The contract was certified by the City
Controller on January 8, 1976. Construction commenced
on January 26, 1976.
J) McAllister Street - Divisadero to Leavenworth
Underground Duct System (Contract HH-526)
Plans and specifications for constructing manholes and
underground duct banks in McAllister Street between
Divisadero and Leavenworth were completed and transmitted
to UMTA on December 22, 1975. The plans and specifica-
tions were approved by UMTA on January 14, 1976. Bids
were received on February 2, 1976. The contract was
awarded on March 9, 1976 to R. Flatland Company. San
Mateo, California who submitted the low bid of $248,430.
The contract was certified by the City Controller on
May 27, 1976. Construction commenced on June 1, 1976.
K) Ashbury, Fillmore, Church, 18th and Other Streets
Underground Duct System (Contract HH-527)
Plans and specifications for constructing manholes and
underground duct banks in Ashbury, Fillmore, Church,
18th and Other Streets were completed and transmitted to
UMTA for approval on March 3, 1976. The plans and
specifications were approved by UMTA on March 9, 1976.
Bids were received on April 15, 1976. The contract was
awarded on April 27, 1976 to The Lowrie Paving Company,
South San Francisco, California, who submitted the low
bid of $367,998.50. The contract was certified by the
City Controller on June 4, 1976. Construction commenced
on June 28, 1976.
L) Ocean Avenue, Persia Avenue and Mission Street - Metro
Center to Russia Street - Underground Duct System
(Contract HH-537)"
Plans and specifications for constructing manholes and
underground duct banks in Ocean Avenue, Persia Avenue
and Mission Street from the new Muni Metro Center to
Russia Street were completed and transmitted to UMTA for
approval on July 25, 1975. The plans and specifications
were approved by UMTA on August 8, 197 5. Bids were
received on October 2, 1975. The contract was awarded
on October 14, 1975 to Venturini Corporation, San Mateo,
California, who submitted the low bid of $127,267.
Construction commenced on December 22, 1975. All work
on this contract was completed in accordance with
contract plans and specifications on June 3, 1976.
34 -
M) Judah Street - 20th to 4 8th Avenues - Underground Duct
System (Contract HH-523J
Work remained suspended on the preparation of plans
and specifications for constructing manholes and under-
ground duct banks in Judah Street between 20th and 48th
Avenues. Feeder cables will be installed in these duct
banks under a later contract. The delay is due to DPW
determination of the extent of the Street Improvement
and Track Reconstruction work.
N) Feeder Underground - Folsom and Howard Streets
(Contract~TJlf^T8T
0) Feeder Undergrounding - Sutter and McAllister Streets
(Contract 7TTI - 5401
P ) Feeder Undergrounding - Irving, Carl, Duboce
Fillmore and Church Streets (Contract HH-552)
Work commenced on the preparation of plans and specifi-
cations for installation of feeder cables in duct banks
constructed under other contracts.
Q) San Jose Avenue and Broad Street - Metro Center to
Plymouth Stree~t - Underground Duct System
XContract HH^STST]
R) Folsom and Howard Streets, Main to 11th Streets
Underground Duct System (Contract HH-559)
S) Haight Street - Stanyan to Gough Streets - Underground
Duct System (Contract HH-560)
T) Fillmore, Jackson, Presidio and Other Streets
Underground Duct System (Contract HH-561)
U) Fulton and McAllister Streets - Stanyan to Divisadero
Underground Duct System (Contract HH-562)
V) Folsom Street - 11th to 16th Streets and 11th Street
Market to Bryant - Underground Duct System
(Contract HH-563)
W) Hayes Street - Van Ness Avenue to Stanyan Street
Underground Duct System (Contract HH-567)
Work commenced on the preparation of plans and specifi-
cations for constructing manholes and underground duct
banks. Feeder cables will be installed in these duct
banks under later contracts.
35
X) Other Work
Preliminary engineering and plans and specifications are
proceeding for duct lines and feeder undergrounding in
accordance with the requirements of the Program.
Y) Manhole Frames and Covers (Second Contract)
Delivery of all manhole frames and covers, totalling 100
sets, was completed on September 15, 1975.
Z) Manhole Frames and Covers (Third Contract)
Contract documents for purchasing an additional 200
sets of manhole frames and covers for use on future Power
Improvement Program contracts were prepared and trans-
mitted to UMTA for approval on April 15, 1976, and were
approved by UMTA on May 4, 1976. Bids are scheduled to
be received by the City Purchaser on July 16, 1976.
6 . Overhead Line Work
A) K-Line, Transit Power Facilities, Street Lighting and
Related Work (Contract HH-517)
Plans and specifications for trolley pole replacement,
overhead trolley wire reconstruction, feeder under-
grounding and street lighting on Junipero Serra Boulevard
from St. Francis Circle to Ocean Avenue, and for feeder
cable installation in duct banks previously constructed
under Contracts HH-498 and HH-502 on West Portal Avenue
and on Ocean Avenue, were completed and transmitted to
UMTA for approval on December 9, 1975. The plans and
specifications were approved by UMTA on December 15, 1975
Bids were received on January 29, 1975. The contract
was certified by the City Controller on April 17, 1976.
Construction commenced on May 24, 1976.
B) K-Line, Ocean Avenue at Route 280 Overpass, Track
Reconstruction and~Power Facilities (Contract MR-620)
Plans and specifications for trolley overhead work and
underground duct lines to be included in Contract MR-620,
"K" Line, Ocean Avenue at Route 280 Overpass, Track
Reconstruction and Power Facilities, were completed and
transmitted to TIP on November 20, 1975. The plans and
specifications were completed by TIP and transmitted to
UMTA for approval on January 23, 1976. The plans and
specifications were approved by UMTA on February 18,
1976. Bids were received on March 12, 1976. The low
bid in the amount of $328,820 includes an amount of
- 36
$64,526 for the Power Improvement Program (PIP) portion
of the work. The contract was awarded to Homer J. Olsen,
Inc., Union City, California on April 9, 1976. The
contract was certified by the City Controller on June 16,
1976. Construction work commenced on June 28, 1976.
C) Transit Preferential Street Program: Mission Street and
Fourth Street, Muni Passenger Platforms and Muni Power
Facilities (DPW Contract 25,834)
Plans and specifications for the PIP portion of Depart-
ment of Public Works (DPW) Contract No. 23,834, Transit
Preferential Street Program: Mission Street, Beale to
South Van Ness Avenue; and Fourth Street, Market to
Townsend; which include the relocation of trolley coach
overhead facilities, were transmitted to UMTA for
approval on October 14, 1975. The Department of Public
Works transmitted the final contract plans and specifica-
tions were approved by UMTA on April 7, 1976 and the
State (FAU) on April 29, 1976. Advertising of the
contract is awaiting scheduling by the Department of
Public Works.
7 . Miscellaneous
A) Coordination meetings of the joint staffs of Transit
Improvement Program and the Power Improvement Program
were held.
B) Coordination meetings were held between Hetch Hetchy
staff and the consultants on the electrification,
substation and control and communication projects.
37 -
BUREAU OF LIGHT, HEAT AND POWER
STREET LIGHTING
General
The lighting of public streets within the City of San Francisco
is provided by facilities which are, on a City-wide basis, 43.51
owned by the City; 54.7s owned by the Pacific Gas and Electric
Company; and a small percentage, 1.81, jointly owned. In the
underground areas, where the economic advantage of City ownership
is greatest, 81.31 of the lights are City-owned. Five years ago,
the corresponding figure was 74.41.
In fiscal year 1933-34, the cost for street lighting was $1.25
per capita; last year, with approximately thirty times as much
light on the~streets and public thoroughfares, the cost per
capita was approximately $1.85. ~
Maintenance and repair of City-owned installations was performed
under two contracts. One provided for group replacement of
lamps in accordance with schedules developed by the Bureau. A
second contract covered work required for repair of damaged and
defective equipment, painting and miscellaneous maintenance.
Under contract, the Pacific Gas and Electric Company furnished
street lighting service as directed, including the furnishing,
maintenance and operation of Company-owned facilities. Certain
services were provided also for City-owned facilities, including
switching and control, replacement of individual lamps and
globes, and emergency work required during other than normal
working hours.
Electric energy for all City and Company-owned streetlight opera-
tion was supplied by the Hetch Hetchy power system.
Engineering
The Bureau reviews, recommends changes, approvals or rejections
of, and correlates all street lighting installations, including
that done by the Department of Public Works, the Pacific Gas and
Electric Company, the State of California, subdividers , etc.
During the fiscal year 1975-76, 19 street lighting contracts,
involving a total of 819 new streetlights, were approved by the
Public Utilities Commission. Plans were submitted only after
careful checking to determine that illumination will exceed the
minimum requirements established by the American National
Standards Institute; and that all materials used, and manner of
installation, meet with the applicable local, state and federal
rules, regulations and statutes governing the installation of
electrical works.
- 38
BUREAU OF LIGHT, HEAT & POWER
REVENUES AND EXPENDITURES
FISCAL YEAR 1975-1976
Operation and Maintenance
As of June 30, 1976, a total of 37,378 City-owned and Company-
owned streetlights were in service to the public streets, parks,
viaducts, overcrossings , tunnels and underpasses. A summary of
the number and type of units in service at the end of the fiscal
year is shown in Appendix Table.
A total of $1,326,226 was expended for operation, maintenance,
and repair of the street lighting system. Of the total cost,
$12,649 was paid by the State for its share of the operation and
maintenance of street lighting at intersections on City streets,
which are part of the State Highway system.
During the fiscal year, there were 114 accidents involving damage
to City-owned street lighting property. Investigation was made,
as soon as possible, to remove hazards to the public and obstruc-
tions to traffic. Total cost of repairs to damaged City-owned
street lighting property was $73,125. Every effort was made to
secure reimbursement for damages incurred from responsible
parties. Previous experience indicates that approximately three-
fourths of the repair costs will be recovered.
Complaints
During the year, 48 complaints requiring field investigation
were received and acted upon. These complaints concerned
inadequate illumination, objectionable glare in windows, and
requests for temporary and permanent relocation of street
lighting poles.
Improvements
During the fiscal year 1975-76, a total of 868 new City-owned
streetlights were placed in service at a cost of $724,798.
Improvements were financed by State Gasoline Tax and the 1964
and 1972 Street Lighting Bond Issues as indicated in Appendix
Tables 16 and 17.
40
UTILITY SERVICES TO MUNICIPAL DEPARTMENTS
General
Electric energy supplied to municiapl departments is generated
on the Hetch Hetchy power system and delivered to various service
points by transmission and distribution facilities of Pacific
Gas and Electric Company under a wheeling contract. Natural gas
supplied to municipal departments is furnished by the Pacific
Gas and Electric Company under a service contract.
Municipal Consumption of Electricity and Gas
During the fiscal year, 486,936,786 kilowatthours of electrical
energy were consumed through 1,054 municipal accounts at an
expenditure of $6,077,738. Of the above, 147,463,469 kilowatt-
hours of energy were supplied to the San Francisco International
Airport for resale to tenants. Natural gas consumption was
17,787,179 therms through 556 accounts at a cost of $2,691,890.
There were several increases in gas rates last year which
increased the cost to municipal accounts by approximately
$805,652. The average cost per therm increased by approximately
421.
A summary of consumption and expenditures for these commodities
is shewn in Tables 12 and 13.
- 41
APPENDIX
TABLE
: 1
HETCH HETCHY
WATER AND POWER*
COMPARISON OF BUDGETED AND ACTUAL
EXPENDITURES (INCLUDING ENCUMBRANCES)
FISCAL YEAR 1975-76
OE
DESCRIPTION
BUDGET
ACTUAL
-UNDER, OVER
110
Permanent Salaries
$
779,469
$
649,653
$ -129,816
111
Overtime
15,750
15,400
-300
112
Holiday Pay
4,070
2,662
-1,408
1?0
Temporary Salaries
53,180
49,102
-4,078
130
Wages
1
,789,623
1
,427,802
-361,821
139
Permanent Salaries - Gardeners
58,107
53,393
-4,714
200
Contractual Services
79,090
97,226
18,136
216
Maint. and Repair of Auto Equipment
12,000
6,118
-5,882
231-1
Purchase of Power for Resale
4
,284,000
3
,903,720
-380,280
231-2
Service Charge for Transm. and Dist.
2
,500,000
2
,436,435
-63,565
2.rl
Subsistence of Employees
10,000
3,464
-6,536
300
Materials and Supplies
140,875
157,519
16,644
640
Water Rights and Damage Claims
12,000
- 9 -
-12,000
641
Hydrography
45,800
45,713
-87
801
Accident Compensation
24,750
42,438
17,688
804
Claims
500
163
-337
812
Fidelity Insurance
72
82
10
813
Automobile Insurance
11,130
11,130
- 9 -
814
Fire Insurance
23,064
23,064
- 9 -
815
Miscellaneous Insurance
39,498
39,498
- 9 -
853
Assessments
45,000
17,077
-27,923
854
Membership Dues
5,312
5,744
432
855
Fee to U.S. Gov't. - Raker Act
30,000
30,000
- 9 -
856
Maint. of Roads - Raker Act
15,000
15,000
- 9 -
860
Retirement Allowances
550,401
367,277
-183,124
8^2
Social Security
114,902
119,989
5,087
865
Health Service System
58,916
33,410
-25,506
870
Taxes
525,396
525,312
-84
880
Rental - Transm. Lines and Offices
136,400
111,900
-24,500
900
Services of Other Departments
TOTAL OPERATION AND MAINTENANCE
$12
864,121
,228,426
864,121
$11,054,412
- 9 -
$ -1,174,014
400
Equipment
59,634
59,628
-6
4 76
Library and Reference Books
800
- 9 -
-800
500
Additions and Betterments
24,000
24,000
- 9 -
700
Reconstruction and Replacement
197,000
197,000
- 9 -
830
Bond Interest and Redemption
TOTALS
8
$21
,840,856
,350,716
8
$20
,840,856
,175,896
- 9 -
$ -1,174,820
* Does not include Transit Power Division - Table 4 or Bureau of Light,
Heat and Power - Table 11.
TABLE 2
SUMMARY OF TAXES
FISCAL YEAR 1975-76
HETCH HETCHY PROJECT
Tax Levying Bodies
Alameda County
San Joaquin County
San Mateo County
Stanislaus County
Tuolumne County
Banta-Carbona Irrigation Dist.
Oakdale Irrigation Dist.
West Stanislaus Irrigation Dist.
Assessed Values
2,350.00
42,250.00
3,610.00
116,170.00
5,706,865.00
3,642.28
25,897.00
4,250.00
Total Amount
of Taxes
284.62
4,533.68
322.10
11,442.62
507,957.24
156.62
544.94
153.00
$ 5,905,034.28
$ 525,394.82
•o
'J
4-1
i
u
■n
<D
>
:•
c
o
O
u
o
>4^
ES
2
o
4J
C -H
(D to
a
tJ
•H
i-l <v
to >
(1)
o c
3
o o
£
o
0>
x:
>
00 01
<!
•H X
X! *J
X!
4J
01 01
X
X o
60
U
TJ
01
0)
X
c
S
•X3
n
1)
•— i
U
a.
■H
m
to
o.
•r-i
CO
5S
p-:
O
W
o
M
en
G
<c
0-
w
F^
H
CO
M
pi
CO
§
Z
8S
O
tx
H
M
H
-D
0)
a)
r^
u
n
03
Q
U
in
C
M
a
o o
o o
m m
o o
o o
o o
o o
o o
cm m
o o o
o o o
m m o
CO CM n N NH
l— 1
o-
i-l i-H
<t
CM
cm
CM CM
CM
ON
C\
O CTv
On
X s s s
LI
<c
3
•H
o
4-1
c
3
M-l
o
01
•3
ui
>
co
M
CO
CO
O
TO
X
X
•-t
01
c
*o
to
4J
c
i-l
c
01
CO
•1-1
0)
x
C
0)
4-1
c
:=>
0)
U
a
c
•1-1
o
4J
60
c
01
OJ
in
•H
f-4
X
h
x:
XI
4-1
0)
tn
to
•H
CO
0)
o
£
<4-l
•1-1
1-4
u
4-1
j-j
E
to
u
01
CO
0)
u
T3
«0
o
4-1
c
0)
i-l
4-J
4-1
o
i-l
C
u
u
o
•o
CI
CO
a)
0)
<u
C
aj
•1-1
4-1
e
i-l
•H
"O
1-1
(0
a
M
U-l
0)
0)
•H
C
•H
a)
•i-l
1-1
0)
01
i-i
3
>
4J
CO
c
cr
>-■
c
O
e
>■>
w
o
0
0)
4-1
4J
i—i
4-1
u
prf
<0
o
01
i-i
c
TO
X
c
T>
CO
0
u
to
o
4-1
O
c
■H
<D
3
M
0)
B
•1-1
CO
c
O
<
10
»-l
bO
h
0)
C
u
■a
X
•H
<u
o
o
fr
i-i.
4-1
p
>
>J
c
0,
•H
o
C
I-l
X
3
3
0)
3
o
o
o
U
G
0)
u
4-1
C
u
to
4J
4-1
Vi
o
>.
0)
0)
c
01
IM
s
CO
S
4J
aj
0)
3
0
CO
w
e
II
II
II
V
3
ex
to
0)
•I-l
cc
1-1
4-1
a o
OS
•o
o
3
•iH
£
1
as
o
CO
1!
c
I-l
0)
01
c
CD
TABLE 4
HETCH HETCHY WATER AND POWER
TRANSIT POWER DIVISION
COMPARISON OF BUDGETED AND ACTUAL EXPENDITURES
(INCLUDING ENCUMBRANCES)
FISCAL YEAR 1975-76
OE DESCRIPTION
110-1 Permanent Salaries
130-1 Wages
200-1 Contractual Services
300-1 Materials and Supplies
801-1 Accident Compensation
860-1 Retirement Allowance
862-1 Social Security
865-1 Health Service System
900-1 Services of Other Departments
TOTAL OPERATION AND MAINT.
700 Reconstruction and
Replacement
TOTAL
]
JUDGET
$
ACTUAL
36,532
$
■UNDER, OVER
$
75,529
-38,997
1,
,230,128
30,000
56,000
35,250
247,147
50,723
10,159
175,258
973,844
2,055
14,973
18,571
160,723
52,508
14,620
175,258
-256,284
-27,945
-41,027
-16,679
-86,424
1,785
4,461
- e -
$
1
,910,194
$1
,449,084
$
-461,110
2
,595,000
2
,595,000
- e -
$
4
,505,194
$4
,044,084
$
-461,110
TABLE 5
HETCH HETCHY WATER AND POWER
SUMMARY OF RECEIPTS AND EXPENDITURES
FISCAL YEAR 1975-76
RECEIPTS
Revenue from Sale of
Electrical Energy
Revenue from Sale of
Water and Standby
Charge, SFWD
Other Revenue
BUDGET
$ 15,883,000
6,500,000
100,000
$ 22,483,000
ACTUAL -UNDER, OVER
$ 19,693,525 $ 3,810,525
6,500,000
187,307
- 9 -
87,307
$ 26,380,832 $ 3,897,832
EXPENDITURES
Total Expenditures
$ 25,855,910
$ 24,219,980 $-1,635,930
r-» <-i
oo
•* -3-
00 6-?
CO o
CO CM
- LO
vo o>
m
!>■ cm
o
co cm
vO
CO -sj"
oo en
m o\
1/1 \C f J
CO CO
hm s
CM i-H
• • o
ON t~~ i-H
On o
co <*
vo in
rN o> vo
CM CO CM
CO CM
O CO *
vO VON
OO CM
CM O
CO in
in oo
CO 1^ s^
ON 00
r- s-S
on in
in \0
f-» CO
<-* o
oo ro
uo co
«* r-l
in vo
oo m
in oo
IS
oo on
r-. cm s-S
on in
N0\0
O r-
. . O
<)■ *£3 i-l
v£> <t
CO »*
CM CM
o -o cu
4-> PSP-1
u
CD
Jj
C/3
4-1
^
a.
Pi
CU
TO
a.
W
X
►J
<c
<
TO
M
>
o cu cu
u
P«
erf
•u ^ J4
O
a
w
CU CO tfl
H
<
en
« >J i-J
o
O
o
vO
O
o
en
CO
.— <
O
00
r^
vD
ifl
CM
c-i
CM
o
CX
H
CU
^
60
erf
CO
W
U
^>
01
H
>
iJ
<
o- u
cu cu
P 01
CJ T>
to 3
TABT.K 7
UETCU UETCHY POWER SYSTEM
ILECTRIC ENERGY GENERATED, PURCHASED, AND DISTRIBUTED
FISCAL YEAR 1975-76
1'l.ANT DATA
Moccasin Powerhouse
Dion R. Holm Powerhouse
Robert C. Kirkwood Powerhouse
Total
energy generated and purchased (kilowatt-hours)
Gross Generation
Nameplate IU
iti
nR
Cap,
ability
Annual
Plant
(Kilowatts
■)
(Ki
lowatts)
Factor - 7„
90,000
104,000
50.6
135,000
150,000
50.0
67,500
85,000
70.2
292,500
339,000
Moccasin Powerhouse
Dion R. Holm Powerhouse
Robert C. Kirkwood Powerhouse
460,560,000
657,219,000
522,892,000
1,640,671,000
Station Service
Moccasin Powerhouse
Dion R. Holm Powerhouse
Robert C. Kirkwood Powerhouse
Met Generation
Supplementary Energy
"Bank" Withdrawal*
Purchase (PGandE)
Total
ENERGY DISTRIBUTED (KILOWATT-HOURS)
Sales
Municipal Accounts
Modesto Irrigation District
Turlock Irrigation District
Kaiser Cement and Gypsum Corp.
Kaiser Aluminum and Chemical Corp.
Morris Industries, Inc.
Lockheed Missiles and Space Co. Inc,
General Motors Corporation
I B M Corporation
Liquid Air, Inc.
Miscel laneous Customers
lion-Revenue
Project Use
"Bank" Deposit*
Losses
Hetch Hetchy System
PGandE System (Municipal Accounts)
Total
841,700
1,238,750
772,150
36,545,220
247,922,311
490,203,242
865,104,000
248,817,883
78,351,659
11,280,000
7,167,744
80,177,458
28,837,778
25,761,600
12,547,200
929.851
3,277,963
2,773,513
33,816,359
33,248,681
2,852,600
1,637,818,400
284,467,531
1,922,285,931
1,849,169,415
6,051,476
67,065,040
1,922,285,931
In accordance with letter-agreement between City and PGandE dated 6/24/75
TABLE 8
1IETCII HETCHY POWER SYSTEM
COMPARATIVE ELECTRIC ENERGY SALES TO CUSTOMERS
FISCAL YEARS 1974-75 AND 1975-76
(Nearest 100,000 Kilowatthours)
CUSTOMER
1974-75
1975-76
Municipal Accounts
International Airport
Municipal Railway
Public Works
Street Lighting
Unified School District
Water Department
Other City Departments
Modesto Irrigation District
Turlock Irrigation District
Kaiser Cement and Gypsum Corp.
Kaiser Aluminum and Chemical Corp.
Morris Industries, Inc.
Lockheed Missiles & Space Co., Inc.
General Motors Corporation
IBM Corporation
Liquid Air, Inc.
Miscellaneous Customers
189,900,000
64,800,000
26,600,000
45,800,000
38,300,000
44,000,000
71,900,000
734,900,000
219,100,000
143,700,000
28,100,000
21,700,000
209,300,000
76,000,000
82,100,000
28,100,000
800,000
189,200,000
56,900,000
26,800,000
46,400,000
39,700,000
48,400,000
82,800,000
865,100,000
248,800,000
78,400,000
11,300,000
7,200,000
80,200,000
28,800,000
25,800,000
12,500,000
900,000
TOTAL
2,025,100,000
1,849,200,000
TABLE 9
RETCH HETCHY POWER SYSTEM
COMPARATIVE GROSS REVENUE RECEIVED FROM SALE OF ELECTRIC ENERGY
FISCAL YEARS 1974-75 AND 1975-76
(Nearest $1,000)
CUSTOMER 1974-75 1975-76
Municipal Accounts
International Airport $ 1,588,000 $ 2,542,000
Municipal Railway 649,000 649,000
Public Works 333,000 330,000
Street Lighting 485,000 517,000
Unified School District 567,000 553,000
Water Department 395,000 4-76,000
Other City Departments 912,000 1,011,000
Modesto Irrigation District 4,289,000 7,457,000
Turlock Irrigation District 1,483,000 2,283,000
Kaiser Cement and Gypsum Corp. 1,927,000 1,318,000
Kaiser Aluminum and Chemical Corp. 418,000 220,000
Norris Industries, Inc. 227,000 164,000
Lockheed Missiles & Space Co., Inc. 2,772,000 1,454,000
General Motors Corporation 1,054,000 572,000
IBM Corporation 1,122,000 478,000
Liquid Air, Inc. 373,000 190,000
Miscellaneous Customers 9,000 10,000
TOTAL $ 18,603,000 $ 20,224,000
t )
o
■
o
m
m
m
r j
•-
oa
O
a
ii
■— i
in
0>
. •
n
m
C 1
m
m
r«i
t
0
UN
o
Cl
O
( >
>o
m
o
m
vC
CM
in
p»
cm
si
.->
r— 1
a
O
CJN
m
r^
m
in
st
in
BO
>c
O
,_,
tN
p .
tM
tn
in
CM
St
-j
m
■'i
^o
i^
en
-t
r-j
c\l O en en o <f
st o oo in o st
CM O CO vO O Is*
m
St
in
,_,
O
in
O
( >
m
CO
Ml
cm
r-t
00
m
cm
T H
o in oo oo
a\ if) <j- in
Sf 00 CM
00 O O O ^O r-l
m
o
o
00
in
m
r^
00
rj
00
cn
a-
CM
50
r-4
u
r— i
■o
st in cm t-i
oo oo O O i-i
m in o O in
st N vD N OO
i in en >0 st cm
i r-4 oo in m o\
-> o
r^
m
cm
3 O
00
CM
t )
3 O
m
st
( )
i st oo r-. idn on
I O in st en O
i en <t> o i-< oo
in
on
-t
in
S.
r-l
m
^O
r-l
CM
>o
in
in
in
r-l
in
r-l
CM
o
O
O
O
ON
1 )
iO
CM
st
JO
in
n
r— 1
^D
no
<t
DO
r-
St
B0
o
in
p-l
H
in
00
SO
^O o o o o o
NN-JOOIN 1 1
1 1 vO 1
i en
CO OlCON N O 1 1
i i m i
i en
st cn in in en m ' '
t i in t
i in
cn in cm vD t-i cm
oo oo O in en cm
<f rv en -<
m
St
in
<t
tyi
en
St
1— 1
St
r— 1
tN
on
m
o
1-4
in
r-l
O
CM
O
O
o
! )
r-.
c^
CN
m
CO
tO
r-4
IN
CO
St
St
00
—1
1 — 1
CM
cn
— 1
St
in
o
m
-X)
kO
on o o o o o
O O O O O viO
en O O O *£> in
on
10
St
00
,_,
in
in
r-(
00
10
eM
CM
CI
OO
St
en
m
en
00 00 r-l
O m cm
m oo st
i ■ i i
till
10 00
CJ\ C3N
in vo
o
O
O
o
en
m
CM
St
0>
CO
in
1 — 1
l-»
—i
LI
C3N
m
r-l
en
CO
St
tn
e J
m
CO
vO
o
O
o
C '
o
O
CO
St
•—>
o
o
St
in
m
i-
O
CM
CO
r— 1
CM
O
cn
on
cn
in
CO
i0
lO
St
kO
m
St
St
o
St
-O
r-<
cn
r-^
vO
DO
St
C3
— 1
tn
tn
St
m
r^
CTi
St
P"N
lO
CT-
CT>
o
cn
MC
cn
St
r-l
ON O O in O CO
00 O O O O ^3
r^ o cm cm O r^.
m
o
CJ> Is*
>D
Si
10
10
c ■>
St
--I CM
c;^
10
o
r^
"""
r~»
iX) t— 1
CTi
^O
ON
CO
I I I I
I I I I
CO JO O cm en
r-» en \D in en
<t in cn h
moooomoo^oo
inoooocoocom'JD
^-loooostostom
r-*
r— 1
^O "0
er-
ON
rj
O en
r-l
CM
IN
in en
st
en
^o
oo in
cn
r-l
rn
St IN
m
o
10
CM 10
iO
COCOr-leNJONsfSl-Sl-CNlCO
ineMcMincncMcjNOcno
sf e-^ en *-* i— ' •— '
I I I IN
I I I St
I I I IN
IN O r-l
v0 CM
en m
r— I \0
o
oo
10
ON
eg
ON
St
IN
10
cn
O
CM
IN
St
cn
r-l
CM
CM
01
0)
V)
;?
3
0
o
a,
.r.
u
T5
CI)
n
s
a
o
3
On
H
U 4J 2
3 B -^ -2
O r-l ^ 3
tn
6J
eo
*
-n
4J
n
C
o
HH
h
CO
u
T)
CJ
.a
H
rc
Cm
3
O
4-1
N- '
CO
H
Q Q cn x: i-i
ex u
c c >,
O O O ■-# co
O nj erj
U 60 M
CJ -H i
J-t
•r-l
■O
6
o
ai
h
-G
tM
cn
l )
cu
n
r-l
«■)
0)
•rJ
60
cn
JJ C 4J O „
r-IC:-r-lt/lC!<t/)0«50
M U S
3M U(j-r-l4JC0 «0
-O cacj4JgOr4}-!Ci)
to
O- o ^
•r-l 4J O
o tn o
■U 01 r-l
c -a
U<r-| to CO 2TJ
3 O 3 to to O
7j ?: h « ^ «
J-i}jcnr-iOM>-.cu
tU CU-rJ 3 m Oi 0)e^
tn tn >j o -i-i r-i ^:
•■-I VJ U r-l rJ H CJ
VJ U -rl CU
CI) 3 CJ
C S C* cn
CU CO -r-l -rJ
O M rJ >J
-J
a.
01
iJ
u
CJ
CD
«
■-—)
c
0
eg
S-l
eo
p-
-
TABU'. 11
BUREAU OF LIGHT, HEAT AND POWER
COMPARISON OF BUDGETED AND ACTUAL EXPENS1TURES AND RECEIPTS
(INCLUDING ENVUMBRANCES)
FISCAL YEAR 1975-76
()[•:
DESCRIPTION
BUDGET
ACTUAL
-UNDER
+OVER
EXPENDITURES
110 Permanent Salaries $ 175,980 $ 158,116 $ -17,864
111 Overtime 550 261 -289
112 Holiday Pay 400 261 -139
200 Contractual Services 1,250 1,259 +9
231 Lighting and Heating of Public
Buildings - General 2,113,223 2,076,281 -36,942
231-1 Lighting and Heating of Public
Buildings - Special Fund 6,086,322 6,140,693 +54,371
231-2 Lighting of Public Streets -
Pacific Gas and Electric Co. 577,000 581,186 +4,186
231-3 Lighting of Public Streets -
Hetch Hetchy 493,000 504,549 +11,549
231-4 Lighting of Public Streets -
Calif. Division of Highways 1,200 1,200 -9-
300 Materials and Supplies 460 490 +30
813 Auto Insurance 257 222 -35
860 Retirement Allowance 28,732 25,761 -2,971
862 Social Security 8,190 5,792 -2,398
865 Health Service System 5,793 3,884 -1,909
954 EDP - PUC Data Processing 1,633 1,633 -9-
TOTAL
$9,493,990
$9,501,5$
$ +7,591
RECEIPTS
Interfund Receipts*
Ad Valorem Taxes
TOTAL
$7,641,616
1,852,374
$9,493,990
$7,928,551
1,573,037
$9,501,588
$ +286,935
-279,337
$ -7,598
WORK ORDER APPROPRIATIONS FROM ROAD FUND
DESCRIPTION
TOTAL FUNDS EXPENDITURE
-UNDER
+OVER
Maintenance and Repair of
Street Lighting Installation
$ 205,000
$ 205,007
+7
* Transfers from other Departments.
!
tabu: 12
bureau of lio»f ,~ "heat and power
EXPENDITURE FOR ELECTRICITY FOR MUNICIPAL PURPOSES
FISCAL
YEAR 1975 -
1976
NO. OF
CONSUMPTION
DEPARTMENT
ACCOUNTS
1
KILOWATT-HOUR
1,095,360
EXPENDITURES
Art Museum
12,696
Auditorium and Brooks Hall
1
b, 539, 200
5b,bl5
^bild Care Centers
12
239,69b
b,908
City Demonstration Agency (a)
1
77,680
1,202
City Planning
1
81,1*60
1,38b
De Young Museum
1
3, 206, bOO
33,6bl
Disaster Corp.
1
78
l,2bb
Electricity
5
bb6,070
7,106
Farmer's Market
1
19,696
b21
Fire
59
3,036,107
53,699
Hassler Health Home
1
201,000
3,000
Health
37
26,7h2,105
257,322
Hetch Hetbhy
6
lUU,12l»
2,926
Hidden Valley Ranch
1
938,880
11,139
International Airport (b)
18
189,260,331
2,5b2,05b
Junior Collepe District
26
7, 69b, 518
88,100
■Juvenile Hall
3
l,blb,b63
15,601
Lepion of Honor
1
550,800
7,019
Library
31
2,727,hU3
bO, 796
Log Cabin Ranch
13
358,219
7,111
Municipal Railway
73
56,869,769
6b8,92b
Parking Authority
18
193,116
b,032
Police
15
871,030
lb, 877
Public Buildings
11
lb, 829, 365
lb9,091
Public Works
106
26,b68,126
32b, 721
Purchasing
5
b8l,068
6,9b2
Heal Estate
b
253,960
b,033
r'r>creation and Park
202
10,305,Qb8
I63,b73
Recreation and Park - Candlestick Park
3
1,993,676
53,160
Recreation and Park - Yatch Harbor
32
1,31b, U76
2b, 276
Sheriff
3
1,636,280
16,706
Social Services
5
815, 2b8
10,92b
Street Lighting Operations (.003)
1
b6,383,311
50b, 5b?
Uni fied School District
222
31,985,522
b 6b, 706
r'-ir Memorial
1
l,377,8b0
17,200
Water
128
b8,38b,523
b76,269
TOTAL MUNICIPAL DEPARTMENTS
1,050
b86,936,786
6,029,667
Academy of Sciences
2
2,951,060
30,17b
State of California: Stredt Liphtinp
1
(c)
12,6b9
Traffic Devices
1
315,396
5,2b8
ORAND TOTAL FROM HETCH HETCHY
i,o5U
b90,203,2h2
6,077,738
Motes: (a) New Account, previously charged in Real Estate Department
(b) Including Ib7,b63,b69 KV/H resold at commercial rates for $2,197,598
to Airport tenants
(c) Included under Street Lighting Operations.
TABLE 13
BUREAU OF LIGHT, HEAT AMD POWER
EXPENDITURE FOR GAS FOR MUNICIPAL PURPOSES
FISCAL YEAR 197$ - 1976
NATURAL GAS
DEPARTMENT
Auditorium and Rrooks Hall
''hi Id Care Centers
City Demonstration Agency (a)
City Planning
Ue Young Museum
Electricity
'■"armer's Market
Pi re
Hassler Health Home
Health
Notch Hetchy
International Airnort
Tunier College District
Juvenile Hal]
Legion of Honor
I ibrary
Municipal Railway
Police
Public Buildings
Public Works
Purchasing
Real Estate
Recreation and Park
Recreation and Park - Candlestick Park
i'"r*istrar of Voters
Sheriff
Si nglo Men's Rehabilition Center
Social Services
"nifjed School District
':\r Memorial
Hater
TOTAL fTTJNICIPAL DEPARTMENTS
NO. OF
ACCOUNTS
2
11
1
1
1
2
1
5b
3
31
2
5
17
b
1
28
13
11
6
15
3
2
106
1
1
3
1
b
213
3
10
556
CONSUMPTION
THERMS
EXPENDITURES
661
lib
30,763
b,702
b,58b
727
5,265
806
282,182
b2,9H
h8,090
7,275
I486
81
582,633
87,56b
32,998
b,965
5.101,853
79b, 2 70
1,91*7
328
1,500,388
217, b20
899,10U
135,658
14104,156
66,9bl
56,329
8,5b5
113, b8o
17,b32
26b, 921
37,718
b5,807
7,017
1,175,537
169,329
26b, 32b
bb,62b
52,565
7,827
8,Ob8
1,192
1,300,528
196,975
109, 6h3
I6,b85
5,837
898
b73,7b5
68,002
37,233
5,571
55,171
8,361
b,bb3,213
677,28b
2bb,2LO
37,171
I55,b72
23,697
17,787,179
2,691,890
"ote: (a) New Account, previously charged in Real Estate Department,
TAPI.E ])i
HUUKAU OK LKifff, HKAT AND POWER
STREET LIGHTS IN SERVICE
JUNE 30 , 1976
SI7! k TYPE OF LAMP
COMPANY-
OWNED
JOINTLY-
OWNED
CITY-
OWNED
TOTAL
Hit- 1 1 Voltage Scries Circuit
1 , bob-Lumen Incandescent
2,500 " "
1,000 " "
6,000 " "
lo,000 " »
hOO-Watt Mercury Vapor
175 " ■
250 " "
I/>w Voltage Multiple Circuit
1,000-Lumen Incandescent
7,500 " »
b,000 " "
6, OQO n "
1(),000 " "
r)',500 '• Fluorescent
23,000 11 "
lOO-Watt Mercury Vapor
175 " "
2C)0 " ■'
1:00 " "
700 " ■
1,000 " ■•
250-V/att Sodium Vaoor
IjOO n "
UNDERGROUND CONNECTION
245
y97
577
llb3
6
10
177
38
10
38
hi
37
30U
22
—
■ 22
2h
73
342
127
l,ll|2
2,266
UUl
3,03l4
b,052
2U
5b7
1,01)4
ll3
236
285
10
10
79
81
...
70
70
It
58
72
2
10U
283
5
85
128
—
111
2b
—
38
38
—
It
12
—
112
112
—
3,521
3,565
—
1,338
1,375
—
li,6oh
b, 908
—
368
368
—
101
101
—
10
10
—
658
658
Hip.h Voltage Series Circuit
2,500-Lurnen Incandescent
h,000 " "
Lor; Voltage Multiple Circuit
?. , 500- Lumen Incandescent
1 1,000 ii "
6,000 '* 11
175-Watt MfTcury Vapor
250 ■• "
Loo ii ■■
TOTAI , JUNE 30, 1976
TOTAL, JUNE 30, 1975
SET CHANGE DURING THE YEAR
OVERHEAD CONNECTION
1
28
2
52
8
111, 705
1,907
798
20,429
54.7%
20,599
-170
1
—
h2
70
—
7
2
59
8
lli, 707
1,907
798
—
2
16,257
692
37,378
1.85?
L3.52
100$
700
15,762
37,061
-8
+h?5
+317
TAFLE 15
BUREAU 0^ LIGHT, HFAT AND POSTER
FXP; MiITlFRES FOR OPERATION AND MAINTENANCE OF STREET LIGHTING
ETSCAL YEA» 1975 - 76
C( 'IT 'R ACTUAL SERVICE
P. 0 . r, E . Company
Connany-owned facilities (a) 82h,lhO
Jointly-owned facilities (a) 3h,623
City-owned facilities (b) 126,819 985,582
Lrr;s deduction for energy component h0h,395 581,187
Emergency service to City-owned facilities 6,600
l>ase-Lite Coloration
Group lamp replacement - City-owned facilities 57,033
Lease-Lite C orporation
Maintenance and repair - City-owned facilities
Routine maintenance
Repair of damage caused by accidents (c)
Repair of damage caused by equipment failure
Repair of damage caused by vandals
MATERIAL AND S 1 '['PLIES (rUPNISHED BY CITY)
Damage caused by accidents (c)
Damage caused by equipment failure
Damage caused by vandals
EIKCTRTC ENERGY (HETGH HETCHY)
1x6,303,311 KWH at $0.02055/KWH less 45.5% discount
TOTAL EXPENDITURE
LE'-? AMOUNT PAID TO HFTCH HFTCHY FROM:
Gas Tax Funds for State Highway Routes
Recreation and Park Department for off-street lighting
TOTAL NET EXPENDITURE
AV -RAGE OPERATI NO COST
Pased on number of lights in service June 30, 1976, average total
cost of operation, maintenance and repair per light per year: 35«39
W PES: (a) Includes maintenance, repaor, fixed charges and
electric energy for Company-owned facilities.
(b) Includes replacement of individual lamp and broken
glassware, service and switching charges, and electric
energy.
(c) When resnonsible party is known, claim is filed for
recovery of cost.
1*7,308
h2,605
hi, 810
2,679
13h,h02
30,520
I0,8lh
1,159
h2,h93
519, h8l
l,3hl,196
12,6h9
2,281
lh,930
1,326,266
TABLE 16
BUREAU OF LIGHT, HEAT MTO POWER
NEW CITY-OWNED STREET LIGHTING INSTALLATIONS
COMPLETED DURING FISCAL YEAR 1975-76
Locations
Financed by Pond Issues:
Castle Manor Area
Laurel Heights Area <c California St,
Market St. Reconstruction Cont. 1
Market St. Reconstruction Cont. 2
Market St. Reconstruction Cont. 2B
Market St. Reconstruction Cont. h
Financed by State Gasoline Tax:
Buchanan St .-Grove to Hayes Sts.
Evans St. - Third to Jennings Sts.
Fairfax Ave. - Newhall to Mendel 1 Sts.
Galvez Ave., Newhall & Mendell Sts.
North Water Front Area
North Water Front Various Location
Park Merced Area
Turk St. - Divisadero St. to Masonic Ave.
Number of
Type
of
Value
Lights
Light
,s*
Value
17
MV
$ !iO,690
lilt
MV
113, 2h5
111
SV
82,907
165
SV
109,781
12
SV
9,125
30
SV
21,180
Total
hhh
S 376,928
2
MV
$ 6,16(3
13
MV
6h,°70
ll»
MV
37,hB5
16
MV
30,510
21
MV
39,235
2
MV
5,990
306
MV
120, h 65
!.
20
MV
b3,055
Total
l»?!i
$ 3U7,870
Grand Total
868
$ 72U.798
# MV - Mercury Vapor
SV - Sodium Vapor (High Pressure)
inofi^ouorgininNWstooM^ooHuinmvjmMoo
^rxr,10^^■',l'^OOvt)^Oln^t(10M>0<flf)^DO^*
Mrl-JhHCfrlOnffuCtOMvsrNrlOOHHl'lO
^^o«nn<oooino-JOMno>oonN-juiinoNM
<r h n iH rH rH rH co ■— m r lONComovoocosi-insi-
n
a
C)
ni
*
s
a
si
rH
u
rH
>-l
(1)
9
u
Q
B
•H
en
rH CT>
in co
vD CM
in en o I
co co in ro
m oo mo cr>
in o oo <y>
.. , » I
I I I I I I I I I
CM CM
CM o
t-i co
rH CO
CNI <?\
is r-l
V\
H
?5
y
w
>
o
p^
ft
»t*
M
Pi
It
U
S3
H
c:
H
Ph
:~
n
1
H
J
<!
H
H
UJ
<
H
33
H
tj)
H
P
!U
UJ
rj
a
M
IS
J
o
fn
^
'J
H
I— i
P
U
<
w
In
«
( I
p
PQ
H
to
O
u
►J
3
c_>
M
VA
O
H
CO
M
K
aj
a
•H
n
H
d!
o
X
en
id
od
H
u
O st 00 rH
4J £ (_l
m is is oo
n) x: cJ
vO CM in rH
u ton
. •>•»•> |
CO -H Q
CM CM vO CTi
III -II
■» m eo -j ic oi r- i st ^o vo o mo m
OUl-JOOulOiriM^NOUIN
■}-JN<tNrlrl!D(MClMniJ>
I - I I I I I I I I I
I I I I I I I I
CO
C l
rH
CO
rH
CM
Is
O
O
O
CM
rH
rH
O
st
■H
CO
m
rH
OO
ri
a.
CO
CI
CJ
in
00
00
rH
rH
n
CO
M3
rH
rH
eg
o
m
m
rH
o
rH
00
rH
vO
CO
CM
CO
CM
rH
is
en
is
rH
o
mo
m
rH
rH
rH
CO
rH
is
rH
CO
o
CM
MO
rH
CM
«*
On
is
en
U2
CM
rH
is
O
m
rH
rH
00
CM
m
00
o
H
vO
CO
co
Is
to
st-
M0
rH
ON
sT
CJl
0"N
CM
CM
in
en
.H
en
o
en
in
rH
sl-
is
co
rH
en
o
ts
CO
con
in
o
rH
MO
CM
CM
o
CO
CO
CM
rH
is
rH
O
o
rH
CM
CO
o
o
CNI
CO
o
en
is
is
-ci-
H
rH
rH
in
is
rH
is
en
On
m
m
O
ON
sr
rH
m
rH
m
vO
CM
is
on
CXI
Is
<r
en
rH
st
|s
in
inn r^ >t co h
is in cm o mo o
io h is r^ h in
oo cm m m <■ cm
«d- <r m rH rH
Is rH rH rH
I I I I I I I I I I
1 vO
<f is
<ii
r- 1
C
on m
3
rH rs
>-)
•H U
4J
s-^
a
r-l 3
•H
CM
td
a, -o
rH
sj"
•H
cr\
c
-a -a
O
rH
0
CJ CJ
CO
1
•rl
> >
<4-l
in
U
O O
en
tn
6 6
T3
CT*
ai
0) (U
0)
rH
u
r-l M
g
'-'
CJ
m
U) to
O
<
pj
C C
1
e s
4mvOM»OiOHNn-ifiriiDrsOOOiOHNr1<tiA*
ininininininvovOvOMDvovOvOvO\Ovoi — • t — i r^ n i — n
I I I I I I I I I I I I I I I I I I I I I I I
cocOst-inoiscoo^OiHcMcosi-invoisoocrvOrHcMco-d-in
mmininininininvOvOvovovovovovovovoi — n n n m^
c^cj^o^o^o^o^o^c^o^o^c^osiosicyicjxo^o^o^o^
<
i;1
n
c:
rH
m
c-
ai
P-
Tl
•H
-1
O
rH
•H
u
C
a
3
H
S
_*<:
u
0
HI
U
:■■
s
tfl
-,(
ID
iw
M
:•'
o
3
Q
■ 1
<y
nj
3
OJ
1 1
rH
3
U)
id
o
•H
>
P
u.
-H
4U
nj
O
a
03
0)
•H
M
u
M
4-1
■H
■H
3
M
u
0
P<
o
U
Ptj
i
o
Pi
en
H
VO
§
O
1^-
§
lO
H
r—
p4
2
cri
w
O
T-i
H
U
<
2
^
O
w
>^
M
>-•
a
H
u
U
hJ
H
35
<
W
Pi
o
3
H
CO
CO
M
33
2:
fn
u
o
H
c_>
w
X
r:
u
Oh
u
3
rH
M
a)
■u
m
tn
a
3
>, 3
a) m
3
< u so
o
1 oo
3
3
H
M -H
a) oj
*«
j-> a
X)
M -H
a)
O cd
0)
PM Ph
w Cd
O 3
Pi cy
a)
Cd
■u
Pi
rs
o
3
-a
00
CO
M
5
3
0J
•U
3
•H
>.
en
tn
3
cd
0)
3
1-4
•H
BC
•H
o
o
CD
4-1
u
4->
1-4
O
•H
aj
H
■u
rH
•*
D,
■H
>,
•H
>.
a;
O
cd
en
cd
3
cd
S
en
^
•H
p4
rH
•H
0)
CH
H
n
•M
M
■H
CO
QJ
a
>>
cd
4-1
&
CO
60
QJ
o
M
QJ
Ph
QJ
Jh
H
to
3
a)
4->
X)
a
M
pa
CO
3
a
xj
3
QJ
o
■H
a
•H
M
M
UJ
nj
cd
O
oo
rt
4-1
e
M
o
l-i
3
rH
a)
o
•H
3
iH
Xl
o
QJ
O
•H
0
S
£
a
(H
o
4-1
a
xl 3
CO
3
3 XI
QJ
o
U
cd oo
3
p-1
o
3
C
4-J
co cd
cd
a)
QJ
QJ
>.
rl X
T)
H
>
0)
rH
cd
CU C/5
a
u
QJ
<:
y>
•H
&
X) -
a
QJ
3
4-1
s
rH
3 O
CM
CO
C
J3
CO
rH
•H
0
QJ
S
4J
s
•«
•H
rH «
O
CU
O
>
0)
vO
CU
QJ
QJ
<f
a.
>i CO
•u
4-1
H
<
4->
<f
4-1
4J
CJ
w
U aj
CO
a)
CO
c
CO
cd
CO
4-)
,c
>-.
O.X)
>.
XJ
QJ
>%
>4-(
CM
4J
oo cd
4-1
CO
•H
-H
CO
C
o
CO
K
3
3 O
o
c
O
cd
•H
3
4-1
•H
•H
m
4->
3
M
4J
>
4-1
CO
CO
cd
4-1 Q)
O
!-)
cu
CJ
CJ
cu
o
PH
cd x)
#»
3
ffi
3
4-1
o
3
OS
p-i
M -H
4-1
Q
Q
QJ
4-1
Q
XI
CU rH
QJ
QJ
O
cu
0)
8
&, CO
OJ
X)
3
4-1
X)
u
cu
X)
XJ
rH
o
U
3
C
C
4-1
3
C
cd
•H
u
4J
3
QJ
XJ
3
CO
a
3
o
g
4J
X) o
CO
O
>
1-1
O
QJ
O
pi
CO
§^
M
<
<d
M
r-(
>
>-i
O
cd
.3
bO
>
oo
cd
<
00
&
4J
rH
00
a
U
s
QJ
M
>
u
J3
CO 3
u
0)
H
QJ
cd
-C
cu
u
rH
XI
QJ -H
3
X)
QJ
3
XJ
u
4-1
X)
QJ
S
4-1 &,
X.
3
O
O
c
cd
o
c
6
vO
cd -H
U
3>
o
CQ
P
H
CN
:=>
iH
co
O P-i
IH
4-J 5S
3
Ill
n)
3
11
ci
i (
c
n
U
o
■rl
>
n
u.
rH
ij
nj
u
G
to
•H
M
ai
bO
U
u
■H
3
•H
h
td
td w
u
P-i
3 u
<u
O 3
4J
co -a
IJ
o
03
id O
<u
c
•
U M
>
M
a
CO P-i
u
□
3
cO
td
ai
rH
f-i
TJ
44
w
r*
CO
rt
cd
rH
rH
z
Pm
Pm
0) 3
P-( 00
C
C -H
■H 3
3 -H
cr ,J
td
o u
-1 -H
> "H
•H CX
Pi -H
Ph
3
•H 13
3 3
cr td
td
o u
c a.
td a>
to prf
43
a)
M
td
t)
c
td to
a o
O T3
& rt
CO -H
13
•H 0>
O 3,
o a)
51 nrf
n
j=
P4 -3
rH 3
01 3
3 !=>
3
u o
4-1 43
O 3
(U Q
rH
W O
44
>^
td c
.a -h
3 44
co td
4J
44 CO
CO T3
td
4-> U
CU M
4*i td
td e
•d s
3 o
td -h
4-1
js td 4-i
U r-l 3
U i-t OJ
3 td 0
42 44 O.
C_> CO -H
3 3
»h tr
l-i w
> 43 OJ
•H 3 rH
U CO W
OJ 43 X)
M 4J 3
4-1 M 3
CO O O
M
V.3
0) 0J
4J > QJ
4J td t3
3 OJ 3
CO rJ C3
O 3
u o
0) M
XI 60
td k
M 01
•H TJ
> 3
•H p
g S
0J CU
.s;
M
0
CJ>
V.
J :
d
a]
r 1
u
'M
u
>•
o
a
a
- i
01
d
3
<Z)
u
^(
a
-j)
<J
o
1 1
>
u3
h
H
4J
m
a
a
3
■H
u
111
C-Ci
u
a
tH
a
•H
M
o
m
a
U
Cm
to
U UO
C
p* >.
pq C
o
d §
•H
'4-4
^ 4-i
n
o a.
c3 -H
U cfl
0)
•h I
PM
to CJ
fc PL.
cO CO
(4-1
ct)
55
j
cu
4J 4->
•H
4J
M
Q
4J r-{
d
CO (0
f-i
to
CU
01
CU tH
•rH
XI c
4J
3
4J
tj
CU O
CO
3 M
O
Ct)
d
d
d
U U
CO
CO
01
^
CU
CU
3
4J H
CJ CU
T3
r-H
CU
>
u
c
to
o d
•S S
w
3
<
o
00
4-»
u a
CO
O -H
a .-i
T3
>s W
CO
M
u
O -H
CO
3 CO
ct)
•H
4-1
01
.H cO
rH
- d
•-3 tO
s
O
to
OJ
TJ
>>p-,
o
to o
C
43
4-1
U
d
cO
Ph
M -H
-a -h
3
CU
dj
H «
CD CO
a in
c/)
c
Pm
CU
CO
15 "
o
4-1
• 3
d
O -H
T-l
U
•H
u
4-J
W C
•H
H B
ccj 3
cu
4-1
CU
a
CJ
CU CU
4J
CO
T3 PQ
0)
o
3
n
cu
CU >
XI
cu a
C
Vi
c
d
4J
M
n <a
oo
O 4J
u
4-1
3
CU
C/)
4-1
4J
•H
CU >-l
P3 O
c
CO
►-)
>
tO
CO O
kJ
■U H
3
CU
<3
d
•H
to
ct) U
B
4->
CU
o
cO
a
H "O
4J
^
C 4J
a,
CU
o
d
•H
i-t
CU
cu i-(
CU
4J H
3 co
•H
^!
o
53
to
m
4-1
4-1 10
CU
C CO
60 C
3
n
X
cu
n
to
CO
4-1 CU
1-1
•H S
ct) o
a*
ct)
3
u
■H
3
>■,
3 VJ
4J
cfl CU
iJ U
W
S
Q
o
a
Pri
to
to Ph
to
Ph Z
e e
4-1
u
Bj
«
u
o
4J
B
d
o
CJ
'376-77
1976 ANNUAL REPORT 1977
HETCH HETCHY
WATER AND POWER
CIVIC CENTER SUBSTATION
^ PUBLIC UTILITIES COMMISSION
CITY AND COUNTY OF SAN FRANCISCO
CITY AND COUNTY OF SAN FRANCISCO
PUBLIC UTILITIES COMMISSION
ANNUAL REPORT
FISCAL YEAR 1976-77
HETCH HETCHY WATER AND POWER SYSTEM
AND
BUREAU OF LIGHT, HEAT AND POWER
0. L. MOORE
GENERAL MANAGER
CITY AND COUNTY OF SAN FRANCISCO
GEORGE R. MOSCONE - MAYOR
PUBLIC UTILITIES COMMISSION
JOHN F. HENNING,
LYDIA LARSEN
H. WELT ON FLYNN
JOSEPH P. BYRNE
PETER McCREA
JOHN B. WENTZ
Jr,
President
Vice President
Commissioner
Commissioner
Commissioner
General Manager
ANNUAL REPORT
FISCAL YEAR 1976-77
HETCH HETCHY WATER AND POWER DEPARTMENT
ORAL L. MOORE - General Manager
This report is respectfully dedicated to
Hetch Hetchy employees, past and present,
whose devoted and conscientious efforts
have made possible these accomplishments
for San Francisco.
O'SHAUGHNESSY DAM AND HETCH HETCHY RESERVOIR
showing the effects of the drought in February, 1977.
HIGHLIGHTS
From the parched Redwood forests of the north state to the blazing
deserts of the south, the one single aspect that dominated all of
the water and power systems in California during the fiscal year
is an unprecedented drought and its devastating impact. For the
Hetch Hetchy Water and Power System, whose hydroelectric genera-
tion is totally dependent on water, and whose viability as a going
concern is principally dependent on power revenue, the year has
been a particularly difficult one financially.
The drought had its beginning in the winter of 1975-76 when lack
of precipitation and meager snowmelt resulted in only 605,388
acre-feet of runoff into Hetch Hetchy Reservoirs during the spring
of 1976, or 53 percent of normal. The second dry year, 1976-77,
resulted in even less runoff during the past spring, totaling only
333,504 acre-feet, or 29 percent of normal. These record low
inflows in successive years have left the three reservoirs in our
mountain watersheds at less than 45 percent of capacity at the
end of the report year.
1 -
Anticipating that the drought might continue into a second year,
the Lower Cherry Aqueduct was reconditioned in the fall of 1976
in the event that water supply to the Hetch Hetchy Aqueduct would
need to be supplemented with water from Cherry Reservoir. This
turned out to be a farsighted move when drought conditions dic-
tated shutting down Dion R. Holm Powerhouse and diverting this
water into the aqueduct to the Bay Area in October 1976.
To further conserve water in our reservoirs against future public
need, a request was submitted to the Secretary of the Interior,
in March 1977, for permission to reduce fish releases from
0' Shaughnessy Dam. So far, the Secretary has not advised us of
any decision in the matter.
Based on the precipitation record for the water year commencing
October 1, 1976, and the result of snow surveys conducted on our
mountain watersheds, the San Francisco Public Utilities Commission
instituted a mandatory 25 percent reduction in system water
consumption. The reduction was put into effect May 1, 1977, in
order to insure the ability of the Hetch Hetchy systems to meet
the needs of the San Francisco Water Department and its service
area during the continuing drought.
Comparing the amount of electric energy generated this year against
that of previous years, the adverse impact of the drought is
apparent. As generation was reduced to about 35 percent of normal,
the resulting revenue available for supplying the cash flow for
operating and maintaining the department was also reduced in
roughly the same proportion. This necessitated rescinding many of
the capital improvement projects scheduled for the year.
In spite of the above, work progressed on the federally assisted
Power Improvement Program for the rehabilitation of the Municipal
Railway transit power system. As of the end of the fiscal year,
approximately $26.5 million has been expended or encumbered. The
professional services contracts for engineering design are 90 per-
cent completed. Twenty-seven contracts for construction work and
material purchases have been completed and twenty-two are currently
in progress. Electrification of the Market Street Subway and Twin
Peaks Tunnel is nearly completed. Ten of the eighteen substations
are under construction, with three completed and in service.
Thirty miles of the eventual fifty miles of underground duct lines
are completed or under construction. Approximately 35 percent of
the underground feeder cable has been installed, and an additional
20 percent is on order for delivery to current installation
contractors. The conversion of the streetcar overhead trolley
system for pantograph operation is progressing with all work on
the "K" Line under construction; the "N" Line ready for bid; and
the "J", "L" and "M" Lines in the final design stages.
2 -
HETCH HETCHY ORGANIZATION AND FUNCTIONS
Under policies established by the San Francisco Public Utilities
Commission, the HETCH HETCHY WATER AND POWER DEPARTMENT and the
BUREAU OF LIGHT, HEAT AND POWER serve the City and County of
San Francisco in the dual function of operating department and
service bureau.
Hetch Hetchy is a municipally-owned system of storage reservoirs
and aqueducts which collects water from the Tuolumne River water-
shed and delivers it to the San Francisco Water Department. As
a by-product of falling water, Hetch Hetchy operates and maintains
hydroelectric generating stations and high voltage transmission
lines for the production and distribution of electric energy.
Through its Transit Power Division, Hetch Hetchy has funded,
operated, maintained and provided improvements for the electric
facilities of the San Francisco Municipal Railway since July 1,
1969.
In order to handle this additional responsibility, Hetch Hetchy
assumed control of the equipment and personnel of the Overhead
Lines and Motive Power Sections of the Municipal Railway.
All of Hetch Hetchy' s expenses, including those of the Transit
Power Division, are supported by water and power revenues.
The Bureau of Light, Heat and Power administers contracts for
furnishing electric, gas and steam services to municipal depart-
ments and handles monthly billings. It also administers contracts
for furnishing street lighting services and for operation and
maintenance of City-owned street lighting. Financing, design and
construction of City-owned street lighting improvements are under
the jurisdiction of the Department of Public Works, and plans for
these improvements must be approved by the Public Utilities
Commission through this Bureau. The Bureau is financed by appro-
priations from municipal departments and gas tax funds.
For fiscal year 1976-77, the Department administered budgeted
funds for all purposes as follows:
Number of Total Amount
Budget Employees Appropriated
Hetch Hetchy Water and Power 216 $ 52,999,096
Hetch Hetchy Water and Power
(Transit Power Division) 52 3,671,863
Bureau of Light, Heat and Power 11 11 ,262 ,850
279 $ 67,933,809
MOCCASIN POWERHOUSE AND RESERVOIR
HI-TCH HETCHY WATER AND POWER SYSTEM
REVENUE AND EXPENDITURES
Revenue from Hetch Hetchy Water and Power operations is derived
principally from two sources:
1. Sale of water to the San Francisco Water Department
2. Sale of electric power and energy to San Francisco Municipal
departments, Modesto and Turlock Irrigation Districts in the
San Joaquin Valley, and seven industrial customers:
Kaiser Cement § Gypsum Corporation Santa Clara County
Kaiser Aluminum § Chemical Corporation Santa Clara County
Lockheed Missiles and Space Company, Inc. Santa Clara County
General Motors Corporation Alameda County
IBM Corporation Santa Clara County
Liquid Air, Inc. Alameda County
Norris Industries, Riverbank Stanislaus County
WATER SALES
This past year, revenue from the sale of water and standby service
to the San Francisco Water Department was $8 million.
POWER SALES
Gross sale of electric energy was $43,341,973, up from $19,693,525
during 1975-76. This doubling of revenue is deceiving, since the
increase does not represent extra return on project investments
for the following reasons:
1. The increase is principally due to the record-breaking amount
of supplementary power and energy which City had to purchase
for resale, on account of the drought, and which was resold
to the customers at substantially the same high price at which
it was purchased.
2. The offset to this year's so-called record revenue, in terms of
expenditure for supplementary power and energy, is $33,921,500
instead of the $2,100,000 budgeted, leaving only $9,420,473 in
net revenue from gross, a far cry from the record net of over
$18 million for 1974-75.
Power and energy delivered to City Departments increased 2.0 per-
cent over the previous year, about the same rate as in 1975-76.
The City department mainly responsible for this increase is the
San Francisco International Airport. Consumption at the Airport,
the single largest energy consumer among the City Departments,
- 5 -
Miscelloneous Revenue
$ 124,451
Administrotion Opeialion &
Moinlenonce Tronsil
Power Division
$ 1,426,705
Copitol Improvement
Hetch Hetchy
Project
$ 221,00
HETCH HETCHY REVENUES
AND EXPENDITURES
FISCAL YEAR 1976-77
has increased by 3.2 percent, indicative of a resurgence of
construction and expansion activities. Requirements for the
Municipal Railway appear to have increased by 9.5 percent over
the previous year. This is not a valid comparison, of course,
because of last year's low consumption due to shutdown of the
public transportation system during the 38-day employees' strike.
Power and energy delivered to Modesto Irrigation District, Hetch
Hetchy's largest power customer, and to Turlock Irrigation District,
the third largest, increased by 17.2 percent and 37.9 percent
respectively this year. These increases are directly related to
the drought. The storage in Don Pedro Reservoir, upon which the
two Districts are dependent for generation and irrigation needs,
has been going down steadily and the Districts have been extremely
careful in using this precious and meager resource. Since Hetch
Hetchy is in the same predicament, 86 percent of the power deliv-
ered to the Districts by Hetch Hetchy had to be supplied from
supplementary power and energy purchased from the Pacific Gas and
Electric Company.
Total generation of 710,002,000 kilowatthours for the report year
from the project's three plants (the lowest production since 1969)
amounts to 43 percent of the output of 1,640,471,000 kilowatthours
in 1975-76. The financial strength of the Department resulting
from this decline in electric energy generation has been severely
impaired. If current conditions continue, additional shortfall
in operating revenue in the upcoming fiscal year can be anticipated.
Hetch Hetchy power is sold at cost to City Departments for munici-
pal purposes, representing a saving to taxpayers for 1976-77 of
approximately $4 million, compared to the cost if supplied by the
local investor-owned utility at rates which include a "fuel cost
adjustment" to account for the additional costs brought on by the
unending price increases in oil, gas and coal fuel used for
electric generation. Beginning September 1976, revised rates for
Hetch Hetchy power, approved by the Commission on July 13, 1976,
became effective for private consumers and municipal users. The
higher rates boosted power revenue from these sources by nearly
$1 million in the fiscal year. This is just another step in our
continuing effort to base our power rates on the value of power
in the market place, in order to maximize the return of the power
that is produced from the Hetch Hetchy system. In a fiscal year
where generation is at a record low, this increase helped to
somewhat ease the economic dislocation brought on by the reduced
generation.
SYSTEM PLANNING
As part of our efforts to increase rainfall in our mountain water-
sheds, in light of the lessons learned from the drought, the
cr
o
25-
20—
en
15-
10—
5-
HETCH HETCHY
GENERATION
SUPPLEMENTAL
~3
1967 1968 1969 1970 1971 1972 1973 1974 1975 1976 1977
( Year Ending June 30 )
HETCH HETCHY ELECTRIC ENERGY SOURCES
40 —
35—
30-
co
or
25—
—i
O
Q
u_
?0 —
o
co
^
o
lb—
10-
5 —
REVENUE DEDUCTI0
FOR SUPPLEMENTA
^
REVENUE
FOR
AF1
SUPF
"ER t
>LEM[
)EDU
■NTA
:TI0f
L
J
1967 1968 1969 1970 1971 1972 1973 1974 1975 1976 1977
( Yea r Ending June 30 )
REVENUE FROM SALE OF ELECTRIC ENERGY
Department has been investigating the feasibility of a weather
modification program. The goal is to increase precipitation by
cloud seeding of appropriate storms in the area. Preliminary
data indicate that our effort should be directed to the Cherry
Watershed. As an initial step to bring this program to fruition,
plans are under way to hire expert consultants for the preparation
of an Environmental Impact Report.
On October 22, 1976, the City and County of San Francisco, through
the Public Utilities Commission, together with the Modesto and
Turlock Irrigation Districts, submitted an "Amended Application
for Preliminary Permit, Clavey-Wards Ferry Project" to the Federal
Power Commission. The application was made in order that the City
and the Irrigation Districts might secure and maintain priority
for a license under the Federal Power Act. The proposed project
consists of three small dams and related facilities designed to
harness the unused power potential of the Tuolumne. They would be
situated on the upper reaches of the river below the City's Dion R.
Holm and Robert C. Kirkwood Powerhouses and upstream from Don
Pedro Dam. It is estimated that the project has a capability of
generating 400 megawatts of power as well as a new water supply of
11,900 acre-feet. However, actual development will depend on the
outcome of a study by federal agencies for possible inclusion of
this portion of the river in the federal wild and scenic river
system.
OPERATION AND MAINTENANCE
On Sunday, November 7, 1976, at approximately 0822 hours, the
13,800 volt metal-clad switchgear unit through which power is
supplied to the 2,500 kVA Ridge Line transformer from Generator
No. 2 at Dion R. Holm Powerhouse failed during routine testing
of a protective device. The failure resulted in destruction of
the circuit breaker element and related appurtenances. However,
service to the Ridge Line was promptly restored by connecting it
to the Mather Line, which is supplied from Robert C. Kirkwood
Powerhouse. Necessary replacements were purchased from General
Electric and installed by Department personnel with final adjust-
ment and testing performed by field engineers from General
Electric. All work was completed and service to the Ridge Line
reverted to Dion R. Holm Powerhouse on June 3, 1977.
WATER PRODUCTION AND TRANSMISSION
Precipitation recorded for the year at our measuring stations was
52 percent of the long term average. Much of this amount fell
during the normally dry summer months and did not run off.
During the year, 89,103,588,000 ga
from the Tuolumne River watershed
Aqueduct to the San Francisco Wate
105 percent of the City's total cu
deliveries represent a decision by
its local storage reserve. In add
6 percent from last year, were del
Atomic Energy Commission at Mocho
Tunnel for use at the Lawrence Rad
58,864,608 gallons, up 19 percent
Groveland Community Service Distri
Mountain Tunnel.
lions of water
through the He
r Department,
stomer consump
the Water Dep
ition, 223,307
ivered to the
Shaft of the C
iation Laborat
over 1975-76,
ct in Tuolumne
were diverted
tch Hetchy
representing
tion. The water
artment to increase
,920 gallons, down
United States
ity's Coast Range
ory at Livermore;
were delivered to
County from the
Appendix Table 6 shows comparative data on precipitation, runoff,
storage and delivery of the Hetch Hetchy Water Supply System.
300,000 —
200,000 —
or
100,000-
1 1972-73 ' 1973-74 ■ 1974-75 ' 1975-76 ' 1976-77 '
DELIVERIES OF WATER TO
SAN FRANCISCO WATER DEPARTMENT
10
OPERATION AND MAINTENANCE - TRANSIT POWER DIVISION
The Transit Power Division is responsible for supplying the 600
volt direct current power that is necessary to operate the street-
cars and trolley coaches of the San Francisco Municipal Railway.
The Transit Power Division is composed of two sections - the
Motive Power Section and the Overhead Lines Section.
Motive Power Section
The Motive Power Section operates and maintains ten substations
which convert electric power from 12,000 volts alternating current
to 600 volts direct current by means of motor-generators, synchro-
nous converters, mercury arc rectifiers and silicon rectifiers.
(See Appendix Table 3 for statistical data.) Motive Power is
also responsible for maintaining the electric motors and associated
control equipment for operating the cable-winding machinery located
in the Cable Car Powerhouse at Washington and Mason Streets. In
addition, Motive Power periodically inspects, cleans, adjusts and
repairs the streetcar and trolley coach headway recorders at
Central Control of the Municipal Railway. The substations operate
24 hours per day, 365 days per year.
In anticipation of the need to assume responsibility for eighteen
new substations being built by the Power Improvement Program
(reported elsewhere in this report) , this section perused and
commented on the wiring and control schemes proposed for these
stations. The first of the new electrical substations, Civic
Center Station, was placed in revenue service in December of 1976.
A commissioning ceremony was held by Mayor George Moscone who
dedicated this first station to the service of the citizens of
San Francisco.
A new mimic board showing the new stations in schematic form was
constructed and installed at the Bryant Substation. As each new
automatic station is completed and becomes operational, it will
be monitored and controlled from this remote location via telephone
lines. Since Civic Center, Church, Judah, Outer Mission and West
Portal Stations are presently unmanned, controls for these stations
were designed and installed on this new mimic board. This new
status display and control board will continually be augmented
with additional automatic station controls until such time as it
shall be superseded by a more sophisticated and flexible Supervisory
Control System.
Overhead Lines Section
The primary function of the Overhead Lines Section is to maintain
in satisfactory operating condition the trolley wire overhead
facilities and the electric distribution system which conveys
power to it. This electric distribution system consists of both
overhead lines and underground cables.
-11
Secondary functions include the maintenance of the Municipal
Railway Signal Systems and the electric light and power installa-
tions at all Municipal Railway buildings.
During fiscal year 1976-77, the Overhead Lines Section responded
to 3,943 emergency calls, an increase of 8 percent over the prior
year. In addition to emergency calls, this section performed a
regular and extensive ongoing maintenance program. All overhead
and underground facilities were systematically inspected and all
worn or damaged parts that could cause accidents or equipment
malfunctions were replaced. This section also operates an
emergency crew 24 hours a day year round, including all holidays.
The main work crew normally worked on the day shift but occasion-
ally was assigned to night work to overhaul facilities during the
hours Muni trolleys and streetcars do not run.
A considerable amount of damage to overhead facilities was caused
by trolley coaches de-wiring and snagging their poles in the
overhead facilities and tearing them down, or by breaking the spans
with the flaying poles. Such damage was repaired at no cost to
the Municipal Railway. Other parties who damaged our facilities
were billed for the cost of repairs. This included damage to
overhead facilities caused by high loads on trucks or careless
operation of crane equipment and damage to underground feeder
cables by contractors digging into our duct lines. During 1976-77,
responsible parties were billed for 9 damage cases totaling
$17,246.41. The Overhead Lines Section also performed work for
4 building owners and contractors under work orders amounting to
$2,994.82. This work included moving trolley poles to accommodate
driveways; relocating trolley poles and feeders to permit construc-
tion of new buildings; temporarily removing trolley wires and
feeders to permit passage of high loads; and shifting of trolley
wires and feeders for various excavations.
The Overhead Lines Section engaged in many other activities of a
related nature which it is especially equipped to perform. These
additional duties included repairs, maintenance and construction
of electrical systems in Muni's car barns, offices and shops;
welding and rebuilding of worn overhead lines special work; making
and rebuilding parts for switches, warning block signals, car
recorders, and strand alarms for the cable car system; installing
mobile radio equipment; installing streetcar and bus stop signs
and public information signs.
12 -
ENGINEERING DIVISION
The Engineering Divi
engineering services
Division and the Pow
the preparation of s
specifications for n
and for items of maj
construction, contra
are provided for all
and Power. Work of
knowledge and expert
which have the neces
Engineering Division
and Construction, El
Administration, and
sion of Hetch Het
for the Ketch He
er Improvement Pr
tudies, reports,
ew construction,
or maintenance,
ct administration
construction wor
unusual magnitude
ise is done by en
sary manpower and
is organized int
ectrical, Mechani
Special Projects
chy Water and Power provides
tchy Project, Transit Power
ogram. These services include
cost estimates, and plans and
for replacement of structures
Surveying, inspection of
and payment recommendations
k under Hetch Hetchy Water
or which requires special
gineering consulting firms
qualifications. The
o six main sections: Civil
cal, Architectural, Engineerinj
(Power Improvement Program) .
During the year, plans and specifications were prepared for the
following work to facilitate and maintain Hetch Hetchy operations
HH-454
Moccasin Sewage Treatment
Plant
A package sewage treatment plant
has been planned to replace the
existing septic tank system. This
process is a carryover from last
year due to the lengthy process
required to obtain approval for a
federal "Clean Water Grant". State
and federal permission to begin
preparation of final plans and
specifications was given in Septem-
ber, 1976. Approval of the final
plans and specifications was ob-
tained in March, 1977. The con-
struction contract has subsequently
been awarded with work to begin in
August, 19 77.
DAVID SHAW, STATIONARY ENGINEER,
PERFORMING A TEST AT THE MOCCASIN
SEWAGE TREATMENT PLANT
13 -
HH-514 - Moccasin Administration Building, Replace Heating System
Under this contract, completed during the year, the old heating
system, using costly fuel oil, was replaced by a new electrical
heating/ventilating system. In addition, extensive electrical
improvements were made to bring the existing electrical system up
to code requirements, and extensive plumbing and architectural
improvements were also made.
HH-54 9 - Bryant Substation and Power Control Center
The Power Control Center (part of the Power Improvement Program
described elsewhere in this report) was originally to be installed
in the existing Bryant Substation building. When engineering
investigations of this 1904 building revealed that it did not meet
seismic standards, it was determined to construct a new building
to house both the Control Center and the new substation. The
Control Center portion of the building will accommodate the facili-
ties for remote supervisory control of the eighteen new automatic
substations that will provide electric power for the Municipal
Railway. The design of the substation portion of the building
was performed by our consultants under the Power Improvement
Program. The design of the Power Control Center portion of the
building has nearly been completed by Hetch Hetchy personnel.
The design of the facility has received approval of the Art
Commission and a City Planning Commission Environmental Impact
Report determination of no significant effect on the environment.
HH - 5 5 5 - Red Mountain Bar Surge Shaft Cover
A construction contract was let to cover the surge shaft with a
steel frame and steel sheets to provide a barrier against debris
entering the water supply.
HH-557 - Paint Steel Trolley Poles, Various Locations
A construction contract was let to prepare and paint trolley poles
in numerous locations throughout the City. This work is part of
a continuing program to rehabilitate all of the trolley poles in
the City that are not to be replaced under the Power Improvement
Program or other federal grant.
HH - 5 6 5 - Lower Cherry Aqueduct Rehabilitation
In anticipation of a continued drought, an emergency construction
contract was let to rehabilitate the Lower Cherry Aqueduct in
order to supplement the water supply to Hetch Hetchy Aqueduct with
water from Lake Lloyd and Lake Eleanor. This three mile long
aqueduct was originally constructed in 1917, had not been used
since 1960, and was in poor condition. The contract has been
completed and diversion of water began in November 1976 with a
capability of supplying approximately 130 mgd into the Hetch
Hetchy Aqueduct at Early Intake.
- 14
HH-566 - San Joaquin Valve House - Backflow Prevention and
Replacement of Miscellaneous Pipeline Appurtenances
Design of this facility has been directed toward a determination
of the actual water level in Elliott Cut and how it is controlled.
HH-568 - Moccasin New Vehicle Refueling Station
Plans and specifications have been completed to replace and
relocate the existing vehicle refueling station that does not meet
present operating and safety requirements. The new location will
also provide for the new air pollution control regulations.
HH - 5 7 3 - Replace, Repair and Paint Trolley Poles, Various Locations
A contract was let to replace, repair and paint trolley poles at
various locations. This work is part of a continuing program to
rehabilitate all of the trolley poles in the City that are not to
be replaced under the Power Improvement Program or other federal
grant.
HH-576 - Hughes Leithold and Foothill Waterlines
Replace and Repair
Design work on this project involved research into the actual loss
of water from natural springs that resulted from the construction
of the Foothill Tunnel in the 1930 's, and included field surveys
to the existing temporary supply system.
15 -
POWER IMPROVEMENT PROGRAM
V.'ork during fiscal year 1976-77 under the UMTA-approved Federal
Grant for the Power Improvement Program was as follows:
1 . Grant Amendment
Amendment No. 2 to the Project Grant was approved by UMTA on
July 21, 1976. This final amendment provides sufficient funds
for the balance of the Project and increases the total Project
Cost to $50.5 million and the Federal Grant to $36.5 million.
2 . Project Status
As of the end of the fiscal year, approximately $26.5 million
has been expended or encumbered. The professional services
contracts for engineering design are 90 percent completed.
Twenty-seven contracts for construction work and material
purchases have been completed and twenty-two are currently in
progress. Electrification of the Market Street Subway and
Twin Peaks Tunnel is nearly completed. Ten of the eighteen
substations are under construction, with three completed and
in service. Thirty miles of the eventual fifty miles of
underground duct lines are completed or under construction.
Approximately 35 percent of the underground feeder cable has
been installed and an additional 20 percent is on order for
delivery to current installation contractors. The conversion
of the streetcar overhead trolley system for pantograph
operation is progressing with all work on the "K" Line under
construction, the "N" Line ready for bid and the "J", "L" and
"M" Lines in the final design stages. Details of the various
projects and contracts are in the following sections.
3 . Electrification and Overhead Conversion
A) Contracts
Construction was essentially completed on Contract HH-521,
Market Street Subway Electrification, Embarcadero Station
to Duboce Portal. Modification of Contract No. 5, in the
amount of $122,690, for corrective work required for final
alignment of the catenary system to suit field conditions,
was approved by UMTA on June 9, 1977. The Contractor
commenced work on the modification.
Construction neared completion on Contract HH-531, Market
Street Subway Electrification, Duboce Junction to Eureka
Station.
All PIP work included in Contract MR-622R, Twin Peaks
Tunnel Electrification, Structural Repairs and Improvements
was completed on June 17, 1977.
- 16 -
JUNIPERO SERRA BLVD. LOOKING NORTH FROM OCEAN AVE,
m^HHBH
BEFORE-Overhead feeder cables and streetcar trolley overhead
AFTER-New trolley/streetlight poles and pantograph type overhead
17
Plans and specifications for Contract HH-524, K Line
Streetcar Overhead System, Conversion for Pantograph
Operation, were completed and transmitted to UMTA for
approval on November 2, 1976. Following approval of
plans and specifications by UMTA, bids were received on
December 2, 1976. The contract was awarded on December 14,
1976 to Amelco Electric, San Francisco, California, who
submitted the low bid of $239,000. The contract was
certified by the City Controller on January 24, 1977.
Construction commenced on February 21, 1977.
Plans and specifications for Contract HH-536, Streetcar
Overhead System, West Portal Avenue, Conversion for
Pantograph Operation, were completed and transmitted to
UMTA for approval on July 28, 1976. Following approval
of plans and specifications by UMTA, bids were received
on August 26, 1976. The contract was awarded on
September 14, 1976 to Mahoney Electric Co. Inc., San
Francisco, California, who submitted the low bid of
$295,671. The contract was certified by the City
Controller on October 21, 1976. Construction commenced
on November 8, 1976.
Construction was completed on Contract HH-517, K-Line
Transit Power Facilities, Street Lighting and Related
Work. Included was the installation of new trolley poles
and overhead trolley wire reconstruction for pantograph
operation on Junipero Serra Boulevard.
Construction on Contract MR-620, "K" Line, Ocean Avenue
at Route 280 Overpass, Track Reconstruction and power
Facilities, was completed. Included was overhead trolley
wire reconstruction for pantograph operation.
Final contract documents for Purchase Contract No. 1 for
Special Trolley Coach/Streetcar Crossing Hardware were
completed and transmitted to the City Purchaser. The
special hardware will be purchased by the City, due to
the six-month manufacturing lead time, and will be
furnished to several installation contractors. The
contract was advertised by the City Purchaser on October 4,
1976. Bids were received on October 29, 1976. The
contract was awarded to Ohio Brass Co., who submitted the
sole bid in the amount of $20,049. The manufacturer, Ohio
Brass Co., completed fabrication of the special trolley
coach/streetcar crossing hardware and delivery was made on
June 8, 1977.
Final contract documents for Purchase Contract No. 2 for
Special Trolley Coach/Streetcar Crossing Hardware were
completed and transmitted to the City Purchaser. Bids
were received on May 20, 1977. On June 27, 1977, the
City Purchaser awarded the contract to Ohio Brass Co.,
who submitted the low bid of $24,275.
During this year, the Municipal Railway outfitted an
existing PCC streetcar with an LRV pantograph, floodlights,
and an observation window in the roof. The location of
the pantograph on this PCC is essentially identical to
its location on the new LRV streetcars now being manufac-
tured for the City of San Francisco. This car was and
will be used by Hetch Hetchy as an overhead trolley system
test car, testing the catenary systems installed in the
Market Street Subway and Twin Peaks Tunnel and testing
the surface overhead trolley systems being converted for
pantograph operation under various contracts. The car
will remain in regular passenger service except when
required for testing.
B) Design
The Consultant, PBQ$D, Inc. and Gibbs $ Hill, Inc. (PBGH)
continued work on final design contract plans and
specifications .
Hetch Hetchy review continued on plans and specifications
at the 95 percent completion level as submitted by the
Consultant for streetcar overhead system conversion for
pantograph operation for Contracts HH-530 ("J" Line -
Duboce to 17th Street), HH-532 ("N" Line), HH-533 ("J"
Line), HH-534 ("LM Line), and HH-535 ("M" Line), with
emphasis on Contract HH-532 ("N" Line) .
Review was completed on the 95 percent completion level
plans and specifications for Contract HH-532, "N" Line
Streetcar Overhead System, Church Street to Nineteenth
Avenue, Conversion for Pantograph Operation, and Sunset
Tunnel Electrification. Comments were transmitted to
the Consultant, PBGH, for incorporation into the final
contract documents. Following return of plans and
specifications from the Consultant, with corrections,
preparation of final contract documents commenced.
Contract is scheduled to be advertised in August 1977.
Plans and specifications to be included in DPW Contracts
23,919 and 23,920 - Judah Street, 19th to 32nd Avenue and
32nd Avenue to La Playa, Street Improvement and Track
Reconstruction, were completed and transmitted to the
Department of Public Works. The work to be included
consists of replacement of trolley poles and conversion
of the streetcar overhead system for pantograph operation,
19
This work was formerly part of Contract HH-532, and the
plans and specifications were prepared by the Consultant,
PBGH. The plans and specifications were approved by UMTA
on May 13, 1977, and June 27, 1977 respectively. Plans
and specifications for DPW Contract 23,919 were approved
by the State (FAU) on June 23, 1977. The contract is
scheduled to be advertised by DPW in July 1977. Adver-
tising of DPW Contract 23,920 is awaiting approval by
the State (FAU) .
Plans and specifications for new trolley pole foundations
on the "M" Line from St. Francis Circle to Junipero Serra
Boulevard were completed and delivered to Muni (TIP) on
May 27, 1977 for inclusion in Contract MR-643, "M" Line
Rerailing. The new trolley poles and overhead conversion
work will be done later under Contract HH-535.
Plans and specifications were completed and transmitted to
Muni (TIP) on March 31, 1977 for Contract MR-642, West
Portal Avenue, Track Reconstruction. The work to be
included consists of the relocation of the streetcar
overhead to suit the new track alignment.
The Consultant completed work of determining the nature,
degree, cause and correction of deviations in catenary
construction from contract designs in the Market Street
Subway. Drawings for the corrective work were completed
and issued to the Contractors.
- 20
Substations
A) Contracts
Construction neared completion on Contract HH-522, Civic
Center, Church, and Downtown Substations, Installation of
Electrical Equipment. The Contractor completed installa-
tion of substation equipment and performed pre-energization
tests at Church and Civic Center Substations. On
November 23, 1976, the Civic Center Substation was dedi-
cated and Unit No. 2 (12 kV ac switchgear, transformer,
4000 kw silicon diode rectifier and 600 V dc switchgear)
was placed in operation. On December 23, 1976, Unit No. 1
(12 kV ac switchgear, transformer, 4000 kw silicon diode
rectifier and 600 V dc switchgear) was placed in operation.
On March 21, 1977, the second major unit of the Power
Improvement Program, Church Substation, consisting of two
4000 kw transformer-rectifier units and associated 12 kV
ac and 600 V dc switchgear, was placed in operation. Unit
No. 1, Phase I at Downtown Substation (12 kV ac switchgear,
transformer, 4000 kw silicon diode rectifier and 600 V
switchgear) was inspected, tested and on July 22, 1976
The Honorable George Moscone, Mayor, and Oral L. Moore, General
Manager, Hetch Hetchy Water and Power, at the dedication ceremony
of the Civic Center Substation, November 23, 1976.
- 21
placed in operation and began supplying 600-volt dc power
to Muni vehicles on lower Market Street and adjacent areas.
Installation of Unit 1, Phase I equipment completed the
first of four phases required to replace the obsolete
rotating machines with modern equipment while keeping the
substation in operation. The Contractor completed the
removal of the old equipment and prepared for installation
of the remainder of the new equipment in the final Phase IV
of the conversion.
Construction neared completion on Contract HH-528, Laguna
Honda and Judah Substations, Construct Buildings and
Install Equipment. On April 29, 1977 Judah Substation
was energized and load tested. This single-unit 4000 kw
rectifier substation began providing power for the "N"
Line streetcars on Judah Street from 20th Avenue to
La Playa on May 3, 1977.
Construction commenced on Contract HH-529, Carl Substation,
Construct Building and Install Equipment, on July 19, 1976.
Bids were received on July 15, 1976 for Contract HH-544,
Fillmore Substation, Construct Building and Install
Equipment. The contract was awarded on July 27, 1976 to
Herrero Brothers, Inc., San Francisco, California, who
submitted the low bid of $641,840. The contract was
certified by the City Controller on August 25, 1976.
Construction commenced on September 13, 1976.
Plans and specifications for Contract HH-546, Randolph
Substation, Construct Building and Install Equipment,
were completed and transmitted to UMTA for approval on
November 8, 1976. The plans and specifications were
approved by UMTA on November 24, 1976. Bids were received
on January 13, 1977. The contract was awarded on
January 25, 1977 to Kaplan-Jones, Joint Venture, who
submitted the low bid of $226,900. The contract was
certified by the City Controller on February 14, 1977.
Construction commenced on March 7, 1977.
Plans and specifications for Contract HH-547, San Jose
Substation, Install Equipment, were completed and trans-
mitted to UMTA for approval on September 14, 1976. The
plans and specifications were approved by UMTA on
September 28, 1976. Bids were received on October 14,
1976. The contract was awarded on October 26, 1976 to
L. K. Comstock § Co., Inc., who submitted the low bid of
$84,790. The contract was certified by the City Controller
on February 3, 1977. Construction commenced on February 28,
1977.
- 22
Plans and specifications for Contract IIH-548, Taraval
Substation, Construct Building and Install Equipment,
were completed and transmitted to UMTA for approval on
January 11, 1977. The plans and specifications were
approved by UMTA on February 3, 1977. Bids were received
on February 24, 1977. The contract was awarded on March 8,
1977 to J. DiGiorgio $ Sons, who submitted the low bid of
$253,950. The contract was certified by the City
Controller on March 23, 1977. Construction commenced on
April 18, 1977.
B) Design
The Consultant, Bechtel, Inc., completed design work on
the substation buildings and equipment installation.
Final plans and specifications for Contract HH-549, Bryant
Substation, Construct Building and Install Equipment, were
received from the Consultant in May 1977. The plans and
specifications will be included in one contract for the
construction of the Bryant Substation and Power Control
Center Building. The design for the Power Control Center
portion of the building is nearing completion by Hetch
Hetchy Engineering personnel.
Final plans and specifications for Contract HH-550, West
Portal Substation, Install Equipment, were received from
the Consultant in October 1976. Advertising of the con-
tract must be deferred until the structure, which is a
part of the new West Portal Station being constructed by
BART, is completed sufficiently in early 1978.
Final plans and specifications for Contract HH-551,
Richmond Substation, Install Equipment, were received
from the Consultant in April 1977. Advertising of the
contract must be deferred until the new West Portal
Substation is completed in 1978, and the equipment from
the existing West Portal Substation will be available for
relocation to Richmond Substation.
Advertising of Contract HH-545, Outer Mission Substation,
Install Equipment, is being deferred until the completion
of the new San Jose Substation under Contract HH-547. The
plans and specifications for HH-545 were previously com-
pleted by the Consultant. This is necessary so that the
Outer Mission Substation can be shut down during recon-
struction and its load temporarily assumed by the San Jose
Substation.
The building design for the new combined Bryant Substation
and Power Control Center received approval from the San
Francisco Art Commission.
- 23
The City Planning Commission issued a negative declaration
of environmental impact and approved the project as con-
forming to the Master Plan.
C) Equipment Purchase
The substation equipment manufacturer, ITE-Gould, completed
production on the $5,896,000 purchase contract.
Review of shop drawings submitted by ITE-Gould was
completed.
Negotiations were conducted with ITE-Gould for a contract
modification to provide additional equipment for Laguna
Honda Substation. The second rectifier, transformer and
related switchgear to be purchased will provide power
reliability in the Twin Peaks Tunnel. This addition to
the Project was approved by UMTA in the Grant Amendment.
Deliveries of equipment under the purchase contract were
virtually completed. Equipment for Laguna Honda, Judah
and Downtown Substations were received by the Contractors,
Herrero Brothers, Inc. (Laguna Honda and Judah) and DeNarde
Construction Co. (Downtown) and is being installed. This
completed delivery to the site for five substations. For
the remaining substations, all items of the equipment,
except for minor shortages, are on hand at the local ware-
house for later pickup by the installation contractors.
Meetings were held with factory representatives from ITE-
Gould to resolve outstanding minor problems that have
developed during installation and initial operation of
the new substation equipment.
The Service Engineer, assigned by ITE-Gould to assist
during installation and testing of the new equipment,
continued to provide assistance at Downtown, Civic Center,
Church, Laguna Honda and Judah Substations.
Work continued on the preparation of plans and specifica-
tions for the purchase of additional substation equipment
for Stations E, F, J and N.
Control and Communications
Plans and specifications at the 90 percent completion level
for Contract HH-569, Supervisory Control System, Equipment
Purchase and Installation, were resubmitted by the Consultant,
Systems Control, Inc., in January 1977. Review was completed,
and the plans and specifications were returned to the Consultant
with comments and corrections to be incorporated into the final
plans and specifications.
24
Plans and specifications at the 90 percent completion level
for Contract HH-574, Communication Cable and Subway Maintenance
Telephone System, Installation Contract No. 1, were submitted
by the Consultant. Review was completed and the plans and
specifications were returned to the Consultant with comments
to be incorporated into the final plans and specifications.
Amendment No. 1 to the existing professional services agreement
was negotiated with the Consultant. The amendment provides
for additional design services necessary to extend the super-
visory control system to the four additional substations - E,
F, J and N, recently added to the PIP, and to increase the
flexibility of the maintenance telephone system. The amendment
which increases the total cost of the agreement from $85,895
to $93,607, was approved by the PUC on August 24, 1976, and
was certified by the City Controller on September 28, 1976.
6. Cable Purchase
Orders totaling 370,000 feet of insulated power cable were
placed during the fiscal year for contracts in progress that
require City-furnished cable. A total of approximately 780,000
feet of cable has been purchased under the contract with
Cyprus Wire § Cable Company, which expired on June 30, 1977.
Efforts to extend the contract were unsuccessful.
Contract documents were prepared and transmitted to UMTA on
June 13, 1977 for a new contract to provide the estimated
650,000 feet of cable required to complete the planned work
under the Power Improvement Program. The contract documents
were approved by UMTA on June 21, 1977. Bids are scheduled
to be received by the City Purchaser on July 8, 1977.
7 . Feeder Undergrounding
A) Church Street - 22nd Street to 30th Street - Underground
Duct System (Contract HH-497) '.
All work on this contract was completed in accordance with
contract plans and specifications on July 14, 1976.
B) Taraval Street and 46th Avenue - 20th Avenue to Vicente
Street - Underground Duct System (Contract HH-503)
All work on this contract was completed in accordance with
contract plans and specifications on October 8, 1976.
C) K-Line, Transit Power Facilities, Street Lighting and
Related Work (Contract HH-517)
All work on this contract was completed in accordance with
contract plans and specifications. Included was underground
- 25
feeder cable installation in previously constructed duct
banks on West Portal and Ocean Avenues and Junipero Serra
Boulevard.
D) Sutter - Presidio Avenue to Leavenworth - Underground Duct
System (Contract HH-525J
All work on this contract was completed in accordance with
contract plans and specifications on September 14, 1976.
E) McAllister Street - Divisadero to Leavenworth - Underground
Duct System (Contract HH-526)
All work on this contract was completed in accordance with
contract plans and specifications on November 24, 1976.
F) Ashbury, Fillmore, Church, 18th and Other Streets
Underground Duct System (Contract HH-526)
All work on this contract was completed in accordance with
contract plans and specifications on January 13, 1977.
G) K-Line, Ocean Avenue at Route 280 Overpass, Track
Reconstruction and Power Facilities (Contract MR-620)
All work on this contract was completed in accordance with
contract plans and specifications. Included was the
construction of underground duct lines.
H) Ocean Avenue and Phelan Avenue Rechannelization and Track
Reconstruction (DPK Contract 23,727)
Bids were received on August 4, 1976 for DPW Contract 23,727
for Ocean and Phelan Avenues Rechannelization, which
includes relocation of trolley poles and the overhead trol-
ley wrire system and the undergrounding of feeder cables,
along with Muni streetcar track relocation and rerailing.
The contract was awarded on September 3, 1976 to Homer J.
Olsen, Inc., Union City, California, who submitted the low
bid of $1,415,831. The amount bid for the PIP work included
in the contract was $63,962. The contract was certified
by the City Controller on November 8, 1976. Construction
commenced on November 10, 1976.
I) Judah Street - 20th to 48th Avenues - Underground Power
Facilities (Contract HH-523)
Plans and specifications for construction of manholes and
underground duct banks and the installation of feeder
cables and related work were completed and transmitted to
UMTA for approval on November 22, 1976. Included in the
26
contract to be funded under the Transit Improvement
Program is the furnishing and installing of new trolley/
streetlight poles and the furnishing and installing of
new feed spans and related work. The plans and specifica-
tions were approved by UMTA on December 1, 1976. Bids
were received on December 16, 1976. The contract was
awarded on January 11, 1977 to L. K. Comstock {j Company,
Inc., San Francisco, California, who submitted the low
bid of $355,462. The contract was certified by the
City Controller on February 8, 1977. Construction
commenced on February 28, 1977.
J) Sutter, McAllister and Fillmore Streets - Underground
Power Facilities and Related Work (Contract HH-540)
Plans and specifications for the installation of feeder
cables in duct banks constructed under Contracts HH-525
and HH-526 were completed and transmitted to UMTA for
approval on August 23, 1976. The plans and specifications
were approved by UMTA on September 8, 1976. Bids were
received on September 16, 1976. The contract was awarded
on September 28, 1976 to Abbett Electric Corporation,
San Francisco, California, who submitted the low bid of
$238,495. The contract was certified by the City
Controller on October 14, 1976. Construction commenced
on November 8, 1976.
K) J, N, No. 22 and 33 Lines, Underground Power Facilities
(Contract HH-552J"
Plans and specifications for installation of feeder cables
in duct banks constructed under Contracts HH-497 and
HH-527, and in existing duct banks in Carl and Irving
Streets, were transmitted to UMTA for approval on March 2,
1977. Following approval by UMTA, bids were received on
March 31, 1977. The contract was awarded on April 12,
1977 to Amelco Electric, San Francisco-, California, who
submitted the low bid of $238,950. The contract was
certified by the City Controller on May 5, 1977. Construe-
tion commenced on May 23, 1977.
L) Folsom and Howard Streets, Eleventh Street to Main Street
Underground Duct System (Contract HH-559)
Plans and specifications for constructing manholes and
underground duct banks in Folsom and Howard Streets
between Eleventh and Main Streets were completed and
transmitted to UMTA for approval on August 23, 1976.
The plans and specifications were approved by UMTA on
27 -
September 8, 1976. Bids were received on September 16,
1976. The contract was awarded on September 28, 1976
to McGuire § Hester, Oakland, California, who submitted
the low bid of $629,735. The contract was certified by
the City Controller on October 25, 1976. Construction
commenced on November 15, 1976.
M) Haight Street - Stanyan to Gough - Underground Duct
System (Contract HH-560)"
Plans and specifications for constructing manholes and
underground duct banks in Haight Street, between Stanyan
and Gough, were completed and transmitted to UMTA for
approval on February 4, 1977. The plans and specifica-
tions were approved by UMTA on February 25, 1977. Bids
were received on March 10, 1977. The contract was
awarded on March 22, 1977 to Underground Construction
Co., Inc., San Leandro, California, who submitted the
low bid of $329,847. The contract was certified by the
City Controller on April 7, 1977. Construction work
commenced on May 2, 1977.
N) Fillmore, Jackson, Presidio and Other Streets
Underground Duct System (Contract HH-561)
Plans and specifications for constructing manholes and
underground duct banks in Fillmore, Jackson, Presidio and
other streets were completed and transmitted to UMTA for
approval on October 29, 1976. The plans and specifica-
tions were approved by UMTA on November 10, 1976. Bids
were received on December 2, 1976. The contract was
awarded on December 14, 1976 to W. R. Thomason, Inc.,
Martinez, California, who submitted the low bid of
$614,000. The contract was certified by the City
Controller on January 11, 1977. Construction work
commenced on January 31, 1977.
0) Fulton and McAllister Streets - 8th Avenue to Diyisadero
STreet - Underground Duct System (Contract HH-562)
Plans and specifications for constructing manholes and
underground duct banks in Fulton and McAllister Streets
between 8th Avenue and Divisadero Street were transmitted
to UMTA for approval on April 5, 1977. The plans and
specifications were approved by UMTA on April 19, 1977.
Bids were received on May 12, 1977. The contract was
awarded on May 24, 1977 to Amalgamated Superior
Engineering, Inc., Oakland, California, who submitted
the low bid of $312,275. The contract was certified
by the City Controller on June 10, 1977, and the
Contractor was notified of the starting date of July 5,
1977.
28 -
P) Folsom Street - 11th to 16th Streets and 11th Street
Market to Bryant - Underground Duct SysteW
(Contract" HH-565J
Plans and specifications for constructing manholes and
underground duct banks in Folsom Street between 11th and
16th Streets and in 11th Street between Market and Bryant
were completed and transmitted to UMTA for approval on
September 10, 1976. The plans and specifications were
approved by UMTA on September 28, 1976. Bids were received
on October 14, 1976. The contract was awarded on
October 26, 1976 to Underground Construction Co., Inc.,
San Leandro, California, who submitted the low bid of
$169,075. The contract was certified by the City
Controller on November 17, 1976. Construction work
commenced on December 13, 1976. All work on this contract
was completed in accordance with contract plans and
specifications on April 14, 1977.
Q) Hayes Street - Van Ness to Stanyan - Underground Duct
System (Contract HH-567)"
Plans and specifications for constructing manholes and
underground duct banks in Hayes Street between Van Ness
Avenue and Stanyan Street were completed and transmitted
to UMTA for approval on June 2, 1977. The plans and
specifications were approved by UMTA on June 21, 1977.
Bids are scheduled to be received on July 21, 1977.
R) Broad Street and San Jose Avenue, M-Line Track Extension
(Contract~MR-644)
Plans and specifications for the PIP portion of work to
be included in Municipal Railway Contract MR-644, Broad
Street and San Jose Avenue, M-Line Track Extension, were
completed and transmitted to TIP on April 8, 1977. The
work to be included consists of construction of manholes
and underground duct banks in San Jose Avenue and Broad
Street, from Plymouth Avenue to Mt. Vernon Avenue. This
work was formerly part of Contract HH-558. Advertising
by TIP for receipt of bids for this contract is awaiting
approval by UMTA of amendment to System Improvement Program
(SIP) .
S) Feeder Undergrounding - Folsom and Howard Streets
(Contract HH-448)"
Work continued on the preparation of plans and specifica-
tions for the installation of feeder cables in underground
duct banks constructed under other contracts.
29
T) Ocean Avenue - Phelan Avenue to Outer Mission Substation
Underground Power Facilities and Related Work
CContract HH-578)
Work commenced on the preparation of plans and specifica-
tions for the installation of feeder cables in duct banks
constructed under DPW Contract 23,727 and Contracts MR-620
and HH-537. Also to be included in this contract will be
the removal of overhead feeders on Ocean Avenue from
Junipero Serra Boulevard to Mission Street and on San Jose
Avenue between Ocean Avenue and Geneva Substation.
U) Union, Parnassus and Clayton Streets - Underground Duct
System (Contract HH-579)
V) Bryant, 16th, Mission, South Van Ness and Other Streets
Underground Duct System (Contract HH-580)
W) California Street - Parker to 32nd Avenue and 8th Avenue
California to Fulton - Underground Duct System"
(Contract HH-581J"
X) San Jose Avenue - Mt . Vernon Avenue to Metro Center
FFLine Track Extension (Future Municipal Railway Contract)
Work commenced on the preparation of plans and specifica-
tions for constructing manholes and underground duct banks.
Feeder cables will be installed in these duct banks under
later contracts.
Y) Other Work
Preliminary engineering and plans and specifications are
proceeding for duct lines and feeder undergrounding in
accordance with the requirements of the Program.
Z) Manhole Frames and Covers (Third Contract)
Bids were received on July 16, 1976 for purchasing an
additional 200 sets of manhole frames and covers for use
on future Power Improvement Program contracts. The contract
was awarded to Neenah Foundry Company, Neenah, Wisconsin,
who submitted the low bid of $68,000. Delivery of the
frames and covers was completed on February 28, 1977.
Transit Preferential Street Program: Mission Street and
Fourth Street, Muni Passenger Platforms and Muni Power
Facilities (DPW Contract 23,834)
Advertising of Department of Public Works (DPW) Contract
No. 23,834, Transit Preferential Street Program: Mission
- 30 -
Street, Beale to South Van Ness Avenue; and Fourth Street,
Market to Townsend, which includes the relocation of trolley
coach overhead facilities, is awaiting scheduling by the
Department of Public Works.
Miscellaneous
A) Coordination meetings of the joint staffs of Transit
Improvement Program and the Power Improvement Program
were held.
B) Coordination meetings were held between Hetch Hetchy staff
and the Consultants on the electrification, substation and
control and communication projects.
31 -
BUREAU OF LIGHT, HEAT AND POWER
STREET LIGHTING
General
The lighting of public streets within the City of San Francisco
is provided by facilities which are, on a City-wide basis, 44.0
percent owned by the City; 54.2 percent owned by the Pacific Gas
and Electric Company; and a small percentage, 1.8 percent, jointly
owned. In the underground areas, where the economic advantage of
City ownership is greatest, 82.4 percent of the lights are City-
owned. Five years ago, the corresponding figure was 78.3 percent.
In fiscal year 1933-34, the cost for street lighting was $1.25 per
capita; last year, with approximately thirty times as much light
on the streets and public thoroughfares , the cost per capita was"
approximately $2.18.
Maintenance and repair of City-owned installations was performed
under two contracts. One provided for group replacement of lamps
in accordance with schedules developed by the Bureau. A second
contract covered work required for repair of damages and defective
equipment, painting and miscellaneous maintenance.
Under contract, the
and Electric Company
street lighting serv
rected, including th
ing , maintenance and
of Company-owned fac
Certain services wer
also for City-owned
including switching
replacement of indiv
and globes, and emer
required during othe
mal working hours.
Pacific Gas
furnished
ice as di-
e furnish-
operation
ilities .
e provided
facilities ,
and control ,
idual lamps
gency work
r than nor-
Electric energy for all City
and Company-owned streetlight
operation was supplied by the
Hetch Hetchy power system.
NEW STREETLIGHTS ON
BOSWORTH STREET
32 -
!
BUREAU OF LIGHT, HEAT & POWER
REVENUES AND EXPENDITURES
FISCAL YEAR 1976-1977
33
Engineering
The Bureau reviews, recommends changes, approvals or rejections
of, and correlates all street lighting installations, including
that done by the Department of Public Works, the Pacific Gas and
Electric Company, the State of California, subdividers, etc.
During the fiscal year 1976-77, 14 street lighting contracts,
involving a total of 664 new streetlights, were approved by the
Public Utilities Commission. Plans were submitted for approval
> only after careful checking to determine that illumination will
exceed the minimum requirements established by the American
National Standards Institute; and that all materials used, and
manner of installation, meet with the applicable local, state and
federal rules, regulations and statutes governing the installation
of electrical works.
Operation and Maintenance
As of June 30, 1977, a total of 37,446 City-owned and Company-
owned streetlights were in service to the public streets, parks,
viaducts, overcrossings , tunnels and underpasses. A summary of
the number and type of units in service, at the end of the fiscal
year, is shown in Appendix Table 14.
A total of $1,524,286 was expended for operation, maintenance,
and repair of the street lighting system. Of the total cost,
$18,773 was paid by the State for its share of the operation and
maintenance of street lighting at intersections on City streets,
which are part of the State Highway system.
During the fiscal year, there were 127 accidents involving damage
to City-owned street lighting property. Investigation was made,
as soon as possible, to remove hazards to the public and obstruc-
tions to traffic. Total cost of repairs to damaged City-owned
street lighting property was $104,000. Every effort was made to
secure reimbursement for damages incurred from responsible parties.
Previous experience indicates that more than half of the repair
costs will be recovered.
Complaints
During the year, 40 complaints requiring field investigation were
received and acted upon. These complaints concerned inadequate
illumination, objectionable glare in windows, and requests for
temporary and permanent relocation of street lighting poles.
Improvements
During the fiscal year 1976-77, a total of 691 new City-owned
streetlights were placed in service at a cost of $1,184,878.
Improvements were financed by State Gasoline Tax and the 1964
and 1972 Street Lighting Bond Issue as indicated in Appendix
Tables 16 and 17.
- 34
1
UTILITY SERVICES TO MUNICIPAL DEPARTMENTS
General
Electric energy supplied to municipal departments is generated on
the Hetch Hetchy power system and delivered to various service
points by transmission and distribution facilities of Pacific Gas
and Electric Company under a wheeling contract. Natural gas
supplied to municipal departments is furnished by the Pacific Gas
and Electric Company under a service contract.
Municipal Consumption of Electricity and Gas
During the fiscal year, 496,305,458 kilowatthours of electrical
energy were consumed through 1,072 municipal accounts at an
expenditure of $6,966,586. Of the above, 152,161,432 kilowatt-
hours of energy were supplied to the San Francisco International
Airport for resale to tenants. Natural gas consumption was
17,174,388 therms through 560 accounts at a cost of $3,321,758.
There were several increases in gas rates last year which
increased the cost to municipal accounts by approximately
$629,868. The average cost per therm increased by approximately
28 percent.
A summary of consumption and expenditures for these commodities
is shown in Tables 12 and 13.
- 35 -
HOWARD P. GRANT
Jl
fin
ui
uu uu
PgQPlg
WOJJii
JACK O'ROURKE
JOE F. DE GRACA
EVERETT M. HINTZE B, KEVIN R. WALSH
36
APPENDIX
HETCH HETCHY RESERVOIR
Hetch Hetchy Reservoir, which provides a water supply for almost
2,000,000 people in the Bay Area, is shown here at its lowest
point during the drought... at 6.8 percent of capacity.
37
CONTENTS OF APPENDIX
Table 1 Summary of Receipts, Expenditures and Taxes
Table 2 Comparison of Budgeted and Actual Expenditures
Table 3 Motive Power Section - Substations
Table 4 TRANSIT POWER DIVISION - Comparison of Budgeted and
Actual Expenditures
Table 5 Construction Contracts
Table 6 Precipitation, Runoff, Storage and Delivery
Table 7 Electric Energy Generated, Purchased, and Distributed
Table 8 Comparative Electric Energy Sales to Customers
Table 9 Comparative Gross Revenue Received From Sale of
Electric Energy
Table 10 Electric Energy Generated, Purchased, and Distributed
By Fiscal Years
Table 11 Comparison of Budgeted and Actual Expenditures and
Receipts
Table 12 Expenditure for Electricity for Municipal Purposes
Table 13 Expenditure for Gas for Municipal Purposes
Table 14 Streetlights in Service
Table 15 Expenditures for Operation and Maintenance of
Street Lighting
Table 16 New City-Owned Street Lighting Installations
Table 17 Historical Cost of City-Owned Street Lighting
Improvements
38
TABLE 1
HETCH HETCHY WATER AND POWER
SUMMARY OF RECEIPTS, EXPENDITURES AND TAXES
FISCAL YEAR 1976-77
RECEIPTS
Revenue from Sale of Electrical
Energy
Revenue from Sale of Water
and Standby Charge, SFWD
Other Revenue
Total Revenue
EXPENDITURES
Total Expenditures
TAXES
Tax Levying Entity
Alameda County
San Joaquin County
San Mateo County
Stanislaus County
Tuolumne County
Banta-Carbona Irrigation Dist.
Oakdale Irrigation Dist.
West Stanislaus Irrigation Dist.
Total
Budget
Actual
-Under, Over
$ 40,933,000
$
43,341,973
$ 2,408,973
8,000,000
8,000,000
100,000
124,451
$ 24,451
$ 49,033,000
$
51,466,424
$ 2,433,424
$ 56,670,959
$
55,970,922
$ -700,037
Total Amount
No. of Bills
As:
$
sessed Values
2,450.00
of Taxes
10
$ 292.76
12
45,375.00
4,481.18
16
3,900.00
361.36
79
124,310.00
12,602.74
42
6,105,311.00
559,936.46
1
3,642.28
156.62
4
25,897.00
535.94
1
4,250.00
153.00
165
$
6,315,135.28
$ 578,520.06
- 39 -
OE
TABLE 2
HETCH HETCHY WATER AND POWER*
COMPARISON OF BUDGETED AND ACTUAL EXPENDITURES (INCLUDING ENCUMBRANCES)
FISCAL YEAR 1976-77
DESCRIPTION
110 Permanent Salaries
110-1 Permanent Salaries - Crafts
111 Overtime
11-1 Overtime - Crafts
112 Holiday Pay
112-1 Holiday Pay - Crafts
113 Extended Workweek
113-1 Extended Workweek - Crafts
120 Temporary Salaries
120-1 Temporary Salaries - Crafts
139 Permanent Salaries - Gardeners
200 Contractual Services
216 Maint. and Repair of Auto Equipment
231-1 Purchase of Power for Resale
231-2 Service Charge for Transm. and Dist.
251 Subsistence of Employees
300 Materials and Supplies
640 Water Rights and Damage Claims
641 Hydrography
801 Accident Compensation
804 Claims
812 Fidelity Insurance
813 Automobile Insurance
814 Fire Insurance
815 Miscellaneous Insurance
853 Assessments
854 Membership Dues
855 Watershed Protection
855 Fee to U.S. Gov't - Raker Act
856 Maint. of Roads - Raker Act
860 Retirement Allowances
862 Social Security
865 Health Service System
870 Taxes
880 Rental - Transm. Lines and Offices
900 Services of Other Departments
TOTAL OPERATION AND MAINTENANCE
400 Equipment
500 Additions and Betterments
700 Reconstruction and Replacement
830 Bond Interest and Redemption
TOTAL
* Does not include Transit Power Division - Table 4 or Bureau of Light,
Heat and Power - Table 11.
BUDGET
1
$
ACTUAL
-UNDER, OVER
$ 823,518
785,429
$ -38,089
1,219,893
1
087,895
-131,998
15,000
10,804
-4,196
121,539
73,888
-47,651
2,200
2,181
-19
2,282
2,282
-
3,869
3,439
-430
10,460
13,603
3,143
55,000
30,441
-24,559
192,000
143,217
-48,783
54,653
54,653
-
101,745
94,218
-7,527
10,209
8,422
-1,787
34,007,000
33
,921,500
-85,500
2,515,000
2
,568,255
53,255
4,000
1,944
-2,056
192,202
232,597
40,395
5,000
944
-4,056
49,800
47,909
-1,891
45,335
45,335
-
500
4,420
3,920
82
82
-
10,599
10,599
-
8,297
26,439
18,142
39,007
39,007
-
51,091
51,091
-
300
366
66
20,000
20,000
-
30,000
30,000
-
15,000
15,000
-
589,119
437,612
-151,507
140,037
135,831
-4,206
77,872
71,665
-6,207
578,520
578,520
-
116,400
114,733
-1,667
982,047
969,176
-12,871
$42,089,576
$41
,633,497
-456,079
106,825
104,850
-1,975
221,000
221,000
-
1,978,035
1
,978,035
-
8,603,660
8
$52
,603,660
,541,042
-
$52,999,096
-458,054
- 40 -
-o
01
u
u
■u
V-.
01
>
>
c
o
o
o
u
vC
e
o
4-1
s
S co
O *0
O
CU 0)
a
,a C
C
0)
TJ cfl
rl
01 iH
01
M r-
S
•H
CO 10
T)
O. -H
C
01
cfl
p.
H
o
o
o
o
o
o
o
o
o
O
o
o
m
LO
c
CN
CO
H
H
N
o o
o
O
rH
<f
rH
iH <r
rH iH
rH
rH
CM
CM
CM
CN CN
on on
on
ON
o\
ON
ON
ON ON
a a a a
b c
c O
QJ
c
C
Cfi
4J
C
u
o
P
0)
o
1
|H
n
C
4J
H
£
a. -h
CO
o
u
a
4-J
d
01
0)
Cfl
•H
o
£,
iH
JC
l-l
.C
a
to
.O
4J
0)
Cfl
cfl
1-1
cfl
II
II
0)
>,»4H
S
o
r-l
iH
o
•H
l-l
4-1
4-)
O
>
cO
CJ
CO
a
to
rl
o
01
01
M
T)
CO
o
0)
4-1
C
rH
4-1
4-1
o
rH
C
o
TJ
o
CO
(1)
a
GJ
•H
4-1
B
TJ
rH
CO
(X
Ol
01
•H
e
•H
u
CJ
Cfl
•H
3
cfl
c
cr
C
>,
W
•u
4-1
u
rH
cO
O
01
rH
c
J2
c
-a
Cfl
o
4-1
o
c
•H
01
S
•H
en
CO
u
(10
l-i
4->
CO
.c
•H
01
•H
4J
l-l
>
c
>.
•H
O
c
3
0)
!3
o
-C
Ol
CJ
CO
4-1
4-1
l-l
0)
C
Ol
IH
4->
o>
ai
£
O
CO
cr.
B
CJ
3
&
CO •
0)
•H
CO
•H
4-1 t-l
a,
T3
CJ
3
•H CM
>,
C
a)
a"
C ON
H
rH
,Q
CD
!=> rH
41
TABLE 4
HETCH HETCHY WATER AND POWER
TRANSIT POWER DIVISION
COMPARISON OF BUDGETED AND ACTUAL EXPENDITURES
(INCLUDING ENCUMBRANCES)
FISCAL YEAR 1976-77
OE DESCRIPTION
110 Permanent Salaries
110-1 Permanent Salaries - Crafts
111-1 Overtime - Crafts
112-1 Holiday Pay - Crafts
113-1 Extended Work Week - Crafts
120-1 Temporary Salaries - Crafts
200 Contractual Services
300 Materials and Supplies
800 Accident Compensation
860 Retirement Allowances
862 Social Security
865 Health Service System
900 Services of Other Departments
TOTAL OPERATION AND MAINTENANCE
400 Equipment
700 Reconstruction and Replacements
TOTAL
-UNDER
BUDGET
ACTUAL
OVER
$
68,425
840,522
91,398
8,851
43,080
8,000
10,626
57,798
20,665
266,830
48,672
28,708
175,113
$
34,548
750,385
99,651
8,718
25,943
9,071
4,092
27,118
20,665
199,471
47,205
26,425
173,413
$
-33,877
-90,137
8,253
-133
-17,137
1,071
-6,534
-30,680
-67,359
-1,467
-2,283
-1,700
$
1,668,688
3,175
2,000,000
$
1
2
,426,705
3,175
,000,000
$
-241,983
$
3,671,863
$
3
,429^880
$
-241^983
42 -
U 00 u
o q co
3 -h oj
1-1 j"
O Q r-l
cfl
QJ CD o
3 C
co
H
IN.
U
r-~
i
1
H
r^
Z
ON
o
H
u
fa
z
<
o
fa
M
►"
H
C_>
►J
P
<
W
u
H
to
co
H
B5
fa
o
o
Cfl C
S H
I I
o
*o
0)
c
rH
CO
w
rH
4J
o
cd
o
rH
H
fa
3 rH
O
CO
3
•H
4J
CO
O
>>
CO
4-1
r-4
p
a)
•H
o
dj
0)
^
CO
o
3
S
4->
4-1
iH
HI
•H
M
o
fa
o
3
QJ
CO
t-l
3
4-1
O
•H
4-1
01
4-1
r-l
0)
O T3
3
4-1
•H
3
14-1
01
p
>
CO
0)
3
u s
HI
01
i-l
•H
o
U-l
<
w
>*
fa
3
H ed
>
CJ
•H
•a
t-i
o
o
o
<D
CO
o
01
<
U
o
01
4-1
Xi
a
X
•H
>
4-1 CO
4-1
CO
4J
O
3
3
4-1
4-1
T)
X
<
c >.
X
CO
fa
CO
01
Q
T3
O
00
•H
CO
D.
•H CO
4J
e
t-l
rH
3
■rl
«*
■H
0)
CO
o
6
CO t-l
VO
cy
0)
u
01
Cd
O
CO
4-1
•H
X
u
1-1
a)
fa fa
-*
4-1
4-1
CD
fa
4-1
CO
o
CJ
u
00
X)
4-1
c
CO
s
>>
XI
H
4-1
JJ
CO
0)
o
•H
CO
•O cfl
T3
0)
r*.
o
•a
CO
3
CJ
H
3
fa
>
4->
co
>,
3 rJ
a
u
CO
fa
3
&
O
r-l
cfl
0)
X
o
3
(U
4J
CO
CO
CO
•H
CO
XI
•H
3
4J
e
4-1
h
Cfl
u
OJ
>
4-1
4-1
3
4-1
X
CO
a
o
o>
I-I
fa
fa
a)
4J
m s
CO
CJ
•H
00
c/>
CO
o
3
•H
<N
5
CO
M
u
•H O
4-1
4-1
o
3
CO
3
4-1
i-i
3
o
a
r-l
4J
3
CO 4J
0)
01
4J
Q
3
•H
4-1
CO
cr
fa
4-1
o
4-1
CO
Q
3. rH
o>
01
CO
4J
01
M
u
u
01
U-l
0)
0) 3
u
u
(1)
•o
>-i
X!
ai
o
0)
CO
0)
•3
01
01
X
•d
fa fa
i->
4-1
3
e
H
00
u
i-i
4-1
c
i-i
0)
3
u
3
r-l
4-1
3
CO
CO
C
3
•H
4-1
0)
3
o
cfl
1-1
3
4-1
O
4->
r-l
3
« s
<U
O
1
►J
CO
TJ
0)
T-l
a
4-1
O
CO
T-l
CO
o
O
o> o
c
rH
>
h
Cfl
c_>
4-1
•H
CO
r-l
CO
g
I-i
o
o
CO
<
00
<U
4-1
4-1
CJ
CO
Vj
60
o>
r-l
r-l
3
&0
CO cfl
•H
>
u
3
0)
01
n
O
4-1
4-1
X
l-i
c
0)
0)
a>
1-1
iH 0)
CO
CO
X
<u
•H
01
^
CO
•H
CO
a
cfl
o»
•H
>
4-1
>
0)
3.rH
co
u
■U
X)
►J
n
(-1
X
>
X
0)
T3
•3
r-l
3
4J
cfl
13
<u o
•H
cO
o
c
4-1
CO
s
•H
3
rH
3
3
O
3
0)
C
fa1 fa
s
H
CN|
»
W
CO
g
fa
U
CO
w
•-)
it3
farf
u
CO
rJ
S3
J-i o
4-1 S5
3
1
5C
i
S3
S3
1
S3
S3
1
S3
1
S3
1
S3
3
S3
S3
S3
S3
S3
S3
S3
43
rH
M
CO
u
a
CO
ai
•H
M
u
00
<J
rH
iH
c
M
u
o
PL4
o
u
S o
,0 O
01
XI
O
0)
-0
C
CO
•H
M
c
cd
c
4J
4J
3
0
00
4-1
3
0
CJ
CO
O
4-1
s
co
0
JS
4-1
•H
H
3
O
•H
4J
•H
CU
ri
4-1
0
4-1
H
M
u
•H
4-1
CO
4-»
-O
4-1
U
0
00
CO
3
cd
CO
4-1
3
■H
CO
a)
u
0)
C
-C
O
M
rl
H
Q
4-1
4->
CO
0)
•H
4-1
&
0
^i
0)
cO
00
6
01
a)
CO
CO
C
e
M
CO
14-1
u
rl
•H
rH
.M
-a
-0
-a
£>
c
O
p.
4J
0
4-1
U
hJ
rH
u u
«
c
J3
s
3
H
O
•H
a
CO
a
c
-3
CO
■H
•H
cu 0
CO
!=
a
3
CO
3
0)
.*
cu
0
XI
CO
4-)
fn
S S
•H
M
0
T3
cr
rH
cu
4->
■H
C
00
4-1
Q.
01
0
>
3
rl
.3
C
3
w
w
u
co
CO
CO
3
0)
QJ
cu
XI
P-. "3
•H
■u
,3
00
CO
CO
O
3
>-.
(J
•H
^
Pd
rl
3
cu
a
0)
O
M
TJ
•H
rH
>-> w
co
CU
3
4-1
u
4-1
cO
-0 4J
a*
CU
3
CO
4-1
rH
CO
>
O
.3
CO
*
CO
3 CO
M
-a
•"3
00
CO
CO
s
O
XI
s
•H
00
Jg
4-)
rl
3 rH
4-1
4-1
01
c
C
4-1
4-1
rd
4J
CO
0
4-1
•H
OJ
T3
0)
0 cu
01
C/-J
rl
t3
XI
■rl
CO
CO
3
0)
c_>
CO
rJ
*
0)
C
4-1
U ptl
01
O
s
T3
-0
3
CO
3
.c
rl
0)
i-4
CO
CO
00
u
*
E
CO
rH
3
M
O
n
a)
4->
3
4-1
•H
rl T3
4-1
4J
<-i
CO
•H
CO
4-1
•rl
0)
OJ
ex
CU
3
CO
>>
rH
CU 3
CO
rl
rH
u
CO
3
"3
ai
4-1
>
3
0
01
0)
0)
rH
-a 3
O
e
•H
a)
*3
ca
4-1
3
cu
O
0
c
u
>
4-1
rH
<
3
U
3
0)
tn
aj
C
01
CO
n
3
(1)
.3
4J
<!
c
rH
O
S CO
0)
3
■u
M
O
4J
4-1
01
4-1
3
M
>
cu co
•H
O
s
0)
4-1
a
CO
4-1
33
O
3
M
00
CO
>-l
cd
<
cO
CO
O
l-l
« -H
(0
>
>•>
>> CO
3
cu
4-1
3
O
rl
XI
CO
o,
H
CO 4-1
•H
Kj
CO
H
e
CO
M
e
CO
i-t
4J
CU
4-1
rH
00
01
0)
n
4J -H
H
CU
3
u
<u
C
4-1
ex
x»
0)
0
0)
«
0
4-1
:s
-C
4J
CO
cu
CU rH
rH
J
4-1
£>
0)
4J
3
CO
•H
rH
l-l
►M
0
0)
4J
4-1
CO
4-1
3
CU
4-1
CU ft
<tj
O
x\
j=
CO
60
C
3
V-i
•H
M
XI
M
rJ
c
rH
3
u
•H
rH
4-1
u u
a
O
3
CO
4-1
r*.
CO
0
cr
CO
3
CO
3
4-1
O
CO
0)
CO
0
cd
O
3
4-1 CO
S
4J
Q
<
0
CO
►J
0
W
U
FQ
2
O
CO
&4
Ph
OS
>
a
Ph
04
co
CO Ci4
- 44 -
4»s
U 00 l-i
o 3 cfl
4-1 3
O Q .H
41 II U
3 3 to
iH O -H
to Q fa
>
r-i
ij
a
u
c
cfl
01
•H
u
u
HI
4-1
TH
■H
c
M
h
o
Pm
o
0
•H
M
U
H
c
43
CO
o
CU
M
CU
M
3
4»S 4J
4)
■H
CU
CO
4-1
CX
3
o
3
3
o
C C
4J
>
M
r-H
3
W
cu
O
i-i
O
o
•H
to i-l
CO
b
u
CX i-l
CJ
CO
CO
cu
43
4=
44
)-■ to
cu
S
0)
CO
O
3
o
1
cfl
o
cfl
O
CO
fa fa
S
to
S3
M
•->
J
M
>->
«*3
s
o
s
U
z
4=
CJ
u
cfl
cu
o
>
-o
u
O
c
.-H
4-1
CJ
>>
4-1
•U
4-1
4-1
4J
CO
CU
CU
>>
42
►»
CJ
c
o
3
4-1
3
CO
CU
cu
0)
44
s
o
r-H
3
o>
3
cu
i-H
a
cu
cu
en
4J
u
rH
<44
•H
4J
M
M
s
M
B
i-H
3
S
3
CU
CO
4-1
i-l
Cfl
CO
tu
CO
4-)
c
4-1
P-
CO
M
ex
•H
■H
CO
O
4=
to
SB
fa
CO
■H
co
•H
4-1
4-1
•H
►4
4-1
44
U
CO
U 01
3
3
3
3
CO
CO
3
•H
3
3
H
O C
4=
X)
o
cr
o
cr
3
3
cr
CO
H
•H
o
CU
O -H
o
C
o
w
u
w
M
o
W
CO
•H
CO
•H
r~-
60
2 -J
4-i
3
o
u
fa
co
<■
u
cu
H
iH
i-H
cfl
CO
3
- s
35
c
a
i-H
3
i-l
3
t-i
o
fa
-a
•H
44
CO
CO o
•H
o
tO
o
CO
O
3
cfl
IS
3
s
o
CU
H tH
44
CO
•H
4-1
•H
4J
•H
o
4-1
i-l
cfl
Z
CU
(11 (0
o
CO
■u
CO
4-1
CO
4-)
•H
CO
-d
0>
3
i-l
I-l
& to
o
u
a)
3
tO
3
CO
4-1
3
3
£
M
o
t4W
44
cfl
O -H
M
u
4-1
H
4->
M
4-1
CO
M
cfl
O
■H
o
CO
pa
H S
01
o
CO
co
co
44
fa
cfl
CO
10
PS
S
43
T3
43
•d
43
CO
•a
CM
^
a
cu
3
>,
3
tH C
3
3
3
3
3
43
3
CN
■o
14
cu
r-i
O
E
•H
01 CO
T3
to
(0
CO
a)
CO
3
cfl
3
0
(Hi
o
•H
CO
CD U
3
BO
4-1
co
3
s
Pi
4-1
<
44
4-> H
CO
oo
01
00
J3
60
CU
3
60
O
o
O
3
co
c
u
c
CX
3
CO
cu
iH
3
z
u
T3
cu
>»
3
44
3
4*
M
•H
0)
o
•H
i-l
•H
o
e
CO
•H
00
cu
a
cu
M
cfl
O
44 M
•H
T3
,M
e
•a
O
XI
■-)
CX
>
■a
n
14
4-1
co
■H
44
2
3 CO
CO
H
01
i-i
iH
"O
i-l
•H
cfl
i-H
z
IJ
03
i-H
1-1
CO
D.
■H 3
3. iH
ij
i-H
•H
3
•H
3
3
H
•H
-a
H
a
o
3
o
•3
CO CU
0)
3
c
•H
3
CO
3
cfl
cr
cfl
3
c
CU
cu
i-l
o
o
cu
fa z
PS
pa
H
fa
pa
M
pa
CO
w
H
pa
•->
►a
BJ
Pi
H
u
hJ
PCi
44 O
3 Z
O
PC SC PS ^C ^ S . — i Ph ^C Pm
PC Pu Pu PS 32 P2 P2 Pm PC PC
45
H
ij
a
u
v.
ad
0/
•h
m
U
00
j-i
iH
T-i
c
M
u
o
Cw
o
u
X)
o
3
e
•H
B
3
4-1
o
O
o
.3
u
3
H
oo
H
1-1
4-1
0)
CO
Pi
13
s
3
o
P
u
S
X» O
C -H
3 -U
O U
U 3
60 1-1
u u
CD CO
XJ 3
c o
00
c
•H
I
u
X!
co
o
3
CO
4-1
XI
4-1
00<4H
•H
U
3
3
c
3
3
o
4J
4J
tH
O
cu
3
(0
•H
o
3
3
3
•H
>
o
J3
*3
4J
■3
>i
XJ
Pi
4J
o
M
M
cu
1-1
00
3
O
3
l-i
rH
•H
u
0)
«
rH
oo
3
cO
D
(0
m
•H
X)
rH
4J
>
W
)-l
O
Q
3
c
•H
>>
td
cu
o
O
J3
o
pq
CO
-Q
rB
i-j
X)
•H
XJ
4J
4J
3
o
CO
0)
c
o
X>
C
VO
rH
oo
JC
4J
c
rH
01
4J
13
4J
■H
3
rH
3
CO
3
3
3
o
cu
i-H
CU
a
CO
O
o
B
4-1
•H
PH
PC
•w
.O
O
cu
3
<u
a)
l-i
o
•H
CD
U
4J
4J
•H
PU
1-1
4-1
CO
4J
h
oo
4-J
en
4-1
O
3
4->
rS
CL,
U
4-1
cu
>,
co
p-
i-i
en
CO
(U
•H
CJ
CJ
•H
cd
>.
CO
<u
3
f*.
0)
.3
•w
>>
CO
3
4J
l-i
rH
cu
i-i
CO
co
X)
4->
2
CO
CO
Ph
X>
3
o
C_>
i-H
e
4-1
4-1
3
c
rH
rH
cu
BC
w
■H
o
CO
CO
4J
O
J3
rH
4-1
CO
3
cu
■H
O
CO
u
CO
4J
o
<u
l-i
cr
«H
o
O
H
rH
c
■1
3
^J
n
■i
CU
3
H
•H
<
O
cu
H
O
•H
4J
o
o
CO
4-1
0)
o
3
3
00
Ck
CO
cu
CO
4-1
CU
r4
XI
a.
CD
>%
4J
O
•3
i-t
2
e
<D
•3
•-)
4)
cu
4J
X)
3
01
>
in
3
•H
•H
cu
Xf
<u
u
3
CU
u
CO
3
3
pi
■H
u
3
4J
M
cu
CO
3
O
•U
4J
3
l-i
4-1
3
4J
3
O
U
pa
4-1
c
CO
4J
co
CO
O
3
4J
co
X
o
3
>-i
3
X
1
3
co
o
>>
H
>-,
co
4J
V-i
•H
o
>
u
M
M
•H
•3
4J
co
4J
00
o
B
B
c
00
CO
•H
l-i
4-1
0)
4J
4_)
u
0)
J3
u
e
>-i
CD
o
CU
M
3
l-l
cu
rl
rH
co
X>
3
(0
(0
0)
4J
00
0)
i-H
0)
4-1
CO
>
0)
CJ
CU
CO
3
3
3
6
•H
o
5
r4
o
•H
•3
rH
x:
CO
rH
cu
X)
a
4J
cu
&
4J
O
•H
CO
o
o
4J
3
CO
3
•H
4-1
>>
o
rH
3
o
X
i-i
O
o
a
H
Pl,
hJ
PC
CO
O
EC
E3
fn
O
CO
CX4
w
s
S w
P4
rJ
H
3 Z
- 46 -
?~
^
£
H
3
H
n
2
1
Ed
>-
Ed
1
c
Cfl
H
H
00
U.
>-
h
EC
•h rsi
oo s^s
O r-
oo o s^s
m r».
cm cr>
-* O
m iH o
00 CO
CM CM
o m
• • u-i
00 r-i
o CO
-3-
-* in
rH CSl
rH CM
co
LO CO
r- CM 8*S
cm on O
• • o
»* \D rH
en sr
X
ON
cn
m
O
r»
v£>
~*
CM
cm
r^
<r
4-1 >. 0-1
01 o
0) (fl Q.
53 -3 <
U 13 g
00 CM
CO u->
m
o
o
H <
\D » M
r^ oo vo
m <■ to
r~ on ^o
CM co CM
CO CM
O 00 vO
VO vO CM
CO CM
1/1 \0
00 m
m oo
rH
■u
o o o
•rl
•H
vO O O
P.
U
CO 00 -H
Cfl
n3
a
o oo r~
0
a)
O O CM
2
u
CO CM
0>
>N
rH
>N >*
CD
ra m
a
•a -o
(0
•H
u u
U-J
0) 0)
a. c
M
O
<U E
<4H
00 3
« e
rH
M v*
<fl
0) X
4J
> m
0
< a
H
►>
u
rH
CD
c
0)
£
s
4-1
w
to
cd
01
E
•H
o
•H
rQ
tf
E
4-1
O
o
u
u
4-1
3
c<
■a
a
(1)
■g
•
3
M
C/5
S
o
t=»
^
CO
,fl
B
0>
U
o
4J
u
rH
iH
01
rH
W
53
a
M
1)
-£
rl
o
O
o
4-1
o
E
01
ON
u
33
0)
LO
>
UH
<M
•H
0
CO
rJ
C
Ifi
o
o
•-{
u
■H
03
4-1
3
>>
a
cr
M
u
0)
0)
01
>
a
u
•rH
0
0
<-t
0
0)
0)
UH
1
■o
o
- 47
TABLE 7
HETCH HETCHY POWER SYSTEM
ELECTRIC ENERGY GENERATED, PURCHASED, AND DISTRIBUTED
Annual P1j
Factor -
41.9
11.5
41.3
710,002
1,804
PLANT DATA
FISCAL YEAR 1976-77
Nameplate Rating
(Kilowatts)
Capability
(Kilowatts)
104,000
150,000
85,000
339,000
330,510,000
135,416,000
244,076,000
853,800
499,290
451,590
int
%
Moccasin Powerhouse
Dion R. Holm Powerhouse
Robert C. Kirkwood Powerhouse
Total
ENERGY GENERATED AND PURCHASED
90,000
135,000
67,500
292,500
(KILOWATT-HOURS)
Gross Generation
Moccasin Powerhouse
Dion R. Holm Powerhouse
Robert C. Kirkwood Powerhouse
Station Service
Moccasin Powerhouse
Dion R. Holm Powerhouse
Robert C. Kirkwood Powerhouse
,000
,680
Net Generation
Supplementary Energy
"Bank" Withdrawal*
Purchase (PGandE)
Total
ENERGY DISTRIBUTED (KILOWATT-HOURS)
Sales
Municipal Accounts
Modesto Irrigation District
Turlock Irrigation District
Kaiser Cement and Gypsum Corp.
Kaiser Aluminum and Chemical Corp.
Norris Industries, Inc.
Lockheed Missiles and Space Co. Inc.
General Motors Corporation
IBM Corporation
Liquid Air, Inc.
Miscellaneous Customers
Non-Revenue
Project Use
"Bank" Deposit*
Losses
Hetch Hetchy System
PGandE System (Municipal Accounts)
Total
1,468,919,029
499,833,145
1,013,509,726
591,956,719
0
0
2,058,278
0
0
0
0
824,292
2,965,669
0
36,002,634
29,965,886
708,197,320
1,468,919,029
2,177,116,349
2,108,182,160
2,965,669
65,968,520
2,177,116,349
* In accordance with letter-agreement between City and PGandE dated 6/24/75
- 48 -
TABLE 8
HETCH HETCHY POWER SYSTEM
COMPARATIVE ELECTRIC ENERGY SALES TO CUSTOMERS
FISCAL YEARS 1975-76 AND 1976-77
(Nearest 100,000 Kilowatthours)
CUSTOMER
1975-76
1976-77
Municipal Accounts
International Airport
Municipal Railway
Public Works
Street Lighting
Unified School District
Water Department
Other City Departments
Modesto Irrigation District
Turlock Irrigation District
Kaiser Cement and Gypsum Corp.
Kaiser Aluminum and Chemical Corp.
Norris Industries, Inc.
Lockheed Missiles & Space Co., Inc
General Motors Corporation
IBM Corporation
Liquid Air, Inc.
Miscellaneous Customers
189,200,000
56,900,000
26,800,000
46,400,000
39,700,000
48,400,000
82,800,000
865,100,000
248,800,000
78,400,000
11,300,000
7,200,000
80,200,000
28,800,000
25,800,000
12,500,000
900,000
195,200,000
62,300,000
26,000,000
46,000,000
39,100,000
44,900,000
86,300,000
1,013,500,000
592,000,000
0
0
2,100,000
0
0
0
0
800,000
TOTAL
1,849,200,000
2,108,200,000
49 -
TABLE 9
HETCH HETCHY POWER SYSTEM
COMPARATIVE GROSS REVENUE RECEIVED FROM SALE OF ELECTRIC ENERGY
FISCAL YEARS 1975-76 AND 1976-77
(Nearest $1,000)
CUSTOMER
1975-76
1976-77
Municipal Accounts
International Airport
Municipal Railway
Public Works
Street Lighting
Unified School District
Water Department
Other City Departments
Modesto Irrigation District
Turlock Irrigation District
Kaiser Cement and Gypsum Corp.
Kaiser Aluminum and Chemical Corp.
Norris Industries, Inc.
Lockheed Missiles & Space Co., Inc.
General Motors Corporation
IBM Corporation
Liquid Air, Inc.
Miscellaneous Customers
2,542,000
649,000
330,000
517,000
553,000
476,000
1,011,000
7,457,000
2,283,000
1,318,000
220,000
164,000
1,454,000
572,000
478,000
190,000
10,000
3,081,000
781,000
359,000
559,000
612,000
509,000
1,126,000
20,982,000*
12,484,000*
124,000
35,000
32,000*
134,000
37,000
60,000
17,000
10,000
TOTAL
$ 20,224,000
$ 40,942,000
* Indicates amount as paid by customer
50
p
o
o
o
CM
r^
<?
o
tO
-*
m
«i
vc
o*
Ni
0\
vt
CI
CM
rn
«a
■ -1
i— i
CM
in vo on o o co
<t <n •— i r~
r-< f*» ri CM
O O O O cm
00 I I I I
o
O
a
( )
m
in
m
^j
DO
o
O
0\
r- 1
CO
P>
c?n
r-l
0>
in
r-l
m
in
CM
<f
tO
in
O
^
CM
CM
en
m
N
<t
CM
m
o>
si>
l>»
C|
<t
CM
<*• o oo m
CM o 00 NO
m <r r-i r-i o i~»
o in oo oo
on vo <t r-
■J- oo CM
00 00 O O r-4
in r^ o O m
•J N >D N CO
I I I r-» r-» i— i r- O
I I i N n vD vf M
i i i i-i oo r-» in o>
O oo m cm
CO N IM H
en en
vO r-l
on m
o
o
O
( )
tO
en
o
in
tO
cnj
r>
l*»
CM
<t
CTN
-H
O
o
(Ti
m
o
rn
r^
4
m
CO
tO
m o o o o in
on o o o o m
CO
o
o
O
tO
r-l
m
o
o
^O
p-.
m
r>»
oo
cm
oo
en
CTN
CM
CO
"""I
tO
.—i
nO
h ^ oven co r-i
CO Cl H <f (N| N
<r r-» cm ,-i
O O r~ m O
o o co cm o
o o en o- «
It « « « 0\
I i I <f co r-. on o
I I I O N4C1CO
i i i en on o i-i
o
o
O
O
ON
o
tO
CM
<r
CO
rs
SO
tO
oo
<t
CO
p»«
o-
00
NO
m
t-H
.—1
m
CO
tO
r-l
en
a-)
r^
cm
r—
m
r-4
m
o
<t
<r
vO
<t
en
<r
r~ o O O O no
ON o O O O r-l
nO o o o o o
N CM <fO O N
00 ON 00 CM CM O
vt en ri r-«. rn m
<f r>. rn <— i
i no i i i en
i in • i i en
i in i i i r»
in
-*
m
<t
CN
en
st
•— i
-t
r-l
c-l
ON
en
O
r-l
r^
r-l
O
CM
O
O
O
O
r^
0t
CM
in
00
s.O
.—i
r^
CO
<t
<t
co
. — i
<—i
CM
en
^
v-r
in
(5
m
NO
NO
CTN
o
O
O
o
a
O
O
O
O
o
no
on
o
o
o
to
r^
ON
nO
st
co
I-I
m
m
00
NO
rj
CM
CM
CO
<t
en
m
m
co oo r-i m i-i cm
O m cm -j" en cm
m 00 <f r-l
i i i i i i i r*.
I I I I i i i st
I I I I I I I oo
nO 00
ON ON
r-. no
rs.
CO
00
O
i— i
r-l
<f
m
NO
CO
<t
tO
CO
r-l
o-
r-l
r-l
CM
C5
a
o
( )
en
en
CM
<r
ON
co
in
r-l
p~
r-t
m
ON
m
. — 1
en
CO
<t
en
O
rM
in
CO
ND
O
<t
NO
en
<*
<t
o
<t
O
en
en
r^
NS
CO
«*
O
ONoomooooo
OOOOOOnOOnO
r~»OcMCMOr>.or^
m o
ON
r^.
sO
<t
NO
NO
o <t
-^
r-j
ON
NO
o
f~^
r-< r»
to
H
ON
nC
ON
CO
I I I I I
I I I I I
I I I I I
cONOOcMcnr~-rs.o
r~.ONNomcnr-imoo
<}■ r^. en i-i
r» no
co in
cm r^
o
CO
CO
JS
O
CO
u
rJ
u
•u
i-l
1— 1
CJ
CO
11
o
to
U)
g G
o
CO
CJ
U
v.
3
•-<
-4
3 o
c
O
u
3
CJ
0
O
Q
a
CO 43
1— 1
CJ
•r-l
-3
e
o
Pm
a. o
E
O
o
4)
43
ca
C
d
P-.
CO
OJ
U
4-)
05
Vj
■a
*
4J
O
0
CJ cfl
CO
•r-l
JG
Cm
CO
CO
3
m
o
i— i
r«
~->
•-N r-l
c
•r-l
tJ
o
3
u
QJ
D
O
3
o
CO
O
CO
W co
3
•U
u
"■8 |
—I
O
3
r-l
d
0
CJ
J=
C
3
u
0i
5
•a 4J
O
C3
CO
I-l
^
CJ
1-1
CO
0
d
u
Pm
_<;
o
Cd
CO
c o
rJ
0
00
CO
4J C
4J
to
CO
u
•r-l
M
CO
V
r-<
i-l
2
rJ
CO 4J
<
o
•r-l
1-4
3 iJ
CO
O
<
CO
O
CO
O
4-1
3
z
s
6
•r-1
J2
W
T3
O J3
H
<
u
rJ
CD g
3
C
u
u
•r-l
4J
CO
•t
O
a
0
r-l
^
3
J=
P-, 3
O
u
rJ
S 3
-a
H
CO
o
4_l
s:
o
r-l
rJ
01
i-i
(1|
o
OO
rJ
J-)
n— ' CO
H
z
r-l
H
M
CD r-l
3
•rJ
3
•r-l
2
o
•rJ
C
H
pej
•
<
■r-i
o
CO
U <
H
CO
3
TJ
z
■3
a <
CO
OJ
<
S
a
H
3
<u
r-l
Q.
o
^
OJ
rJ
O
<U
r-4
rJ
■-I
3
nd
—1
Z
w
H
•r-l
4-1
O
rJ U
CO
-M
o
P
;>>
CD
CO
o
-3
r-4
3
K
m
K!
4-)
w
o
33
o
m
o
OJ 01
i-l
3
U-l
Q-,
CJ
-3
u
CJ
•r4
OJ
cu
2
CO
'-I
-^
£1
CO
co
•r-l
OJ
1— 1
co co
U
O
•r-4
r-4
^
CJ
3
O
p>
H
u
c
O
w
C
u
M
CJ
3
■3
rJ
1-1 T-l
M
rJ
—1
w
l—l
a
d
a
cr
CO
cu
CJ>
o
o
X!
rJ
'->
u
Cm
r— i
3
0
3
CO CO
O
OJ
CO
•-I
to
o
OJ
CO
•r 1
•^
k;
o
•-J
O
P-|
CO
3
H
CD
^
"^~;
H
i4 m
z
r3
U
<
>
-J
CJ
1-^
rJ
X
i
H
^
n
pd
s
r
P-i
00
r-l
co
d
o
Z
en
Q
Z
- 51 -
OE
TABLE
11
BUREAU OF LIGHT,
HEAT AND POWER
COMPARISON OF BUDGETED AND ACTUAL EXPENDITURES
AND
RECEIPTS
(INCLUDING ENCUMBRANCES)
FISCAL YEAR 1976-77
-UNDER
DESCRIPTION
BUDGET
ACTUAL
+0VER
EXPENDITURES
Permanent Salaries
$ 181,225
$
153,913
$ -27,312
Overtime
538
538
9
Holiday Pay
537
9
-537
Contractual Services
1,284
1,338
+54
Lighting and Heating of Public
Buildings - General
2,372,380
2
,617,266
+244,886
Lighting and Heating of Public
Buildings - Special Fund
7,440,009
7
,130,728
-309,281
Lighting of Public Streets -
Pacific Gas and Electric Co.
695,380
706,554
+11,174
Lighting of Public Streets -
Hetch Hetchy
507,620
540,350
+32,730
Lighting of Public Streets -
Calif. Division of Highways
1,400
1,400
9
Materials and Supplies
500
499
-1
Equipment
1,700
1,507
-193
Auto Insurance
257
257
9
Retirement Allowance
33,408
28,459
-4,949
Social Security
8,205
5,757
-2,448
Health Service System
6,407
4,911
-1,496
EDP - PUC Data Processing
12,000
12,000
9
TOTAL
$11,262,850
$11
,205,477
$ -57,373
RECEIPTS
Interfund Receipts*
$ 8,718,076
$ 8
,389,311
$-328,765
Ad Valorem Taxes
2,544,774
2
,816,166
+271,392
TOTAL
$11,262,850
$11
,205,477
$ -57,373
WORK ORDER APPROPRIATIONS FROM ROAD FUND
-UNDER
DESCRIPTION
TOTAL FUNDS
EXPENDITURE
+OVER
Maintenance and Repair of
Street Lighting Installations
$ 238,372
$
239,667
$ +1,295
* Transfers from other Departments,
52
TABLE 12
BUREAU OF LIGHT, HEAT AND POWER
EXPENDITURE FOR ELECTRICITY FOR MUNICIPAL PURPOSES
FISCAL YEAR 1976-77
DEPARTMENT
Art Commission (a)
Art Museum
Auditorium and Brooks Hall
Child Care Centers
City Demonstration Agency
City Planning
De Young Museum
Disaster Corp.
Electricity
Farmer's Market
Fire
Hassler Health Home
Health
Hetch Hetchy
Hidden Valley Ranch
International Airport (b)
Junior College District
Juvenile Hall
Legion of Honor
Library
Log Cabin Ranch
Municipal Railway
Parking Authority
Police
Public Buildings
Public Works
Purchasing
Real Estate
Recreation and Park
Recreation and Park - Candlestick Park
Recreation and Park - Yacht Harbor
Sheriff
Social Services
Street Lighting Operations (.003)
Unified School District
War Memorial
Water
TOTAL MUNICIPAL DEPARTMENTS
Academy of Sciences
State of California:
Street Lighting
Traffic Devices
GRAND TOTAL FROM HETCH HETCHY
NO. OF
CONSUMPTION
ACCOUNTS
KILOWATT-HOUR
EXPENDITURES
3
38,320
792
2
1,248,640
15,938
1
4,917,000
66,933
12
268,067
5,391
1
170,720
2,925
1
80,660
1,440
1
3,059,200
36,573
1
117
1,711
5
844,218
11,051
1
25,706
520
59
2,993,742
54,644
1
133,000
2,375
A3
29,520,323
299,786
6
128,975
2,728
1
827,040
11,485
18
195,244,022
3,081,124
26
7,746,837
100,695
3
1,397,914
16,825
1
533,600
7,839
31
2,444,828
39,228
13
307,759
6,427
75
62,282,949
780,500
18
179,171
3,672
15
828,646
14,904
14
15,301,621
168,256
111
25,712,986
353,696
5
533,334
7,697
5
245,248
5,341
208
9,997,703
167,708
3
2,078,538
66,212
32
1,153,833
21,859
3
1,429,560
16,374
5
854,272
11,812
1
45,976,235
540,350
219
31,373,067
510,535
2
1,525,360
22,057
126
44,882,247
509,183
1,072
496,305,458
6,966,586
2
3,212,291
36,343
1
(c)
18,773
1
315,396
5,596
1,076
499,833,145
7,027,298
Notes: (a) New Account.
(b) Including 152,161,432 KWH resold at commercial rates for $2,682,816
to Airport tenants.
(c) Included under Street Lighting Operations.
53
TABLE 13
BUREAU OF LIGHT, HEAT AND POWER
EXPENDITURE FOR GAS FOR MUNICIPAL PURPOSES
FISCAL YEAR 1976-1977
NATURAL GAS
DEPARTMENT
Art Commission (a)
Auditorium and Brooks Hall
Child Care Centers
City Demonstration Agency
City Planning
De Young Museum
Electricity
Farmer's Market
Fire
Hassler Health Home
Health
Hetch Hetchy
International Airport
Junior College District
Juvenile Hall
Legion of Honor
Library
Municipal Railway
Police
Public Buildings
Public Works
Purchasing
Real Estate
Recreation and Park
Recreation and Park - Candlestick Park
Registrar of Voters
Sheriff
Single Men's Rehabilitation
Social Services
Unified School District
War Memorial
Water
TOTAL MUNICIPAL DEPARTMENTS
NO. OF
CONSUMPTION
ACCOUNTS
THERMS
EXPENDITURES
2
3,398
680
2
1,007
197
11
30,156
5,723
1
9,539
1,878
1
4,551
883
1
238,287
46,149
2
38,560
7,566
1
335
70
54
441,321
85,108
3
1,443
293
34
6
,011,678
1,141,123
2
1,730
341
5
1
,444,270
278,861
17
606,221
116,916
4
404,798
78,562
1
49,483
9,685
28
93,808
18,256
14
264,005
54,733
11
40,994
7,925
5
1
,233,393
239,823
15
284,860
59,913
3
42,173
8,242
3
4,203
762
105
1
,118,168
216,320
1
94,716
18,366
1
2,934
557
3
438,175
84,274
1
15,179
2,758
4
48,849
9,532
211
3
,832,147
752,904
3
235,392
46,277
11
138,615
27,081
560
17
,174,388
3,321,758
Note: (a) New Account
- 54
TABLE 14
BUREAU OF LIGHT, HEAT AND POWER
STREETLIGHTS IN SERVICE
JUNE 30, 1977
SIZE & TYPE OF LAMP
High Voltage Series Circuit
1,000-Lumen Incandescent
2,500-Lumen Incandescent
4,000-Lumen Incandescent
6,000-Lumen Incandescent
10,000-Lumen Incandescent
400-Watt Mercury Vapor
175-Watt Mercury Vapor
250-Watt Mercury Vapor
Low Voltage Multiple Circuit
1,000-Lumen Incandescent
2,500^Lumen Incandescent
4,000-Lumen Incandescent
6,000-Lumen Incandescent
10,000-Lumen Incandescent
5,500-Lumen Fluorescent
23,000-Lumen Fluorescent
100-Watt Mercury Vapor
175-Watt Mercury Vapor
250-Watt Mercury Vapor
400-Watt Mercury Vapor
700-Watt Mercury Vapor
1,000-Watt Mercury Vapor
250-Watt Sodium Vapor
400-Watt Sodium Vapor
COMPANY-
JOINTLY-
CITY-
OWNED
OWNED
OWNED
TOTAL
UNDERGROUND CONNECTION
___
22
___
22
245
24
62
331
937
122
1
,065
2,124
571
449
2
,455
3,475
430
17
515
962
6
43
232
4
79
281
4
81
2
__.
___
60
60
10
4
54
68
142
5
109
256
34
5
84
123
10
14
24
38
38
38
4
42
111
111
45
3
,783
3,828
34
1
,641
1,675
304
4
,660
4,964
369
369
100
100
309
309
658
658
OVERHEAD CONNECTION
High Voltage Series Circuit
2,500-Lumen Incandescent
4,000-Lumen Incandescent
Low Voltage Multiple Circuit
2,500-Lumen Incandescent
4,000-Lumen Incandescent
6,000-Lumen Incandescent
175-Watt Mercury Vapor
250-Watt Mercury Vapor
400-Watt Mercury Vapor
TOTAL, JUNE 30, 1977
TOTAL, JUNE 30, 1976
NET CHANGE DURING THE YEAR
1
1
14
14
2
58
8
14,697
49
2
107
8
14,699
2
1,908
1,908
802
802
20,298
691
16,457
37,446
54.2%
1.8%
44.0%
100%
20,429
692
16,257
37,378
131
1
200
68
- 55
TABLE 15
BUREAU OF LIGHT, HEAT AND POWER
EXPENDITURES FOR OPERATION AND MAINTENANCE OF STREET LIGHTING
FISCAL YEAR 1976 - 77
CONTRACTUAL SERVICE
P. G. & E. Company
Company-owned facilities (a) 883,566
Jointly-owned facilities (a) 30,875
City-owned facilities (b) 105,038 1,019,479
Less deduction for energy component 312,925 706,554
Emergency service to City-owned facilities 5,946
Lease-Lite Corporation
Group lamp replacement - City-owned facilities 58,485
Lease-Lite Corporation
Maintenance and repair - City-owned facilities
Routine maintenance 50,130
Repair of damage caused by accidents (c) 53,392
Repair of damage caused by equipment failure 44,857
Repair of damage caused by vandals 2 ,615 150,994
MATERIAL AND SUPPLIES (FURNISHED BY CITY)
Damage caused by accidents (c) 37,713
Damage caused by equipment failure 14,495
Damage caused by vandals 2 ,160 54,368
ELECTRIC ENERGY (HETCH HETCHY)
45,976,235/KWH at $0.02408/KWH less 48.6% discount 569,053
TOTAL EXPENDITURE 1,545,400
LESS AMOUNT PAID TO HETCH HETCHY FROM:
Gas Tax Funds for State Highway Routes . 18,773
Recreation and Park Department for off-street lighting 2,341 21,114
TOTAL NET EXPENDITURE 1,524,286
AVERAGE OPERATING COST
Based on number of lights in service June 30, 1977, average total
cost of operation, maintenance and repair per light per year: 40. 71
NOTES: (a) Includes maintenance, repair, fixed charges and
electric energy for Company-owned facilities.
(b) Includes replacement of individual lamp and broken
glassware, service and switching charges, and electric
energy.
(c) When responsible party is known, claim is filed for
recovery of cost.
56 -
TABLE 16
BUREAU OF LIGHT, HEAT AND POWER
NEW CITY-OWNED STREET LIGHTING INSTALLATIONS
COMPLETED DURING FISCAL YEAR 1976-77
Number of Type of
Lights Lights*
Locations
Financed by Bond Issues:
Trumbull St. - Mission to Alemany St.
Fillmore - Chestnut
Bayshore Blvd. - Costa St. to County Line
Fillmore - Sutter
Maiden Lane - Grant Ave. to Kearny St.
Outer Richmond and Sunset Area
Potrero Ave. - Division to Army
Valencia St. - Market to Mission
Eugenia Ave. Stairway, Prospect Ave. to
Winfield St.
Value
Total
11
MV
$
22,001
58
MV
77,968
27
MV
140
SV
286,520
54
MV
65,401
4
MV
6,132
125
MV
284,133
119
MV
118,881
142
MV
293,066
2
MV
6,944
682
$1
,161,045
Financed by State Gasoline Tax:
John Mulr Drive
Newhall and Mendall Sts.
Total
Grand Total
5
4
9
691
MV
MV
$ 17,310
6,523
$ 23,833
$1,184,878
*MV - Mercury Vapor
SV - Sodium Vapor (High Pressure)
57
m o
~3- CO
CO
.— i
en
00
SO
O
-9
00
c-
CM
SO
m
e i
en
in
CM
cn
o
CM
O
VL>
SO
00
sC
C l
m
SO
r-
O
00
H
O
C]
ir,
SO
en
m
st
m
r-1
vC>
oo
o
en
en
-*
00
i •
00
r ■»
o
CM rH
sr on
sr *-(
•a
o
CM
00
m
rH
00
CI
oo
rH
o
m
rH
en
o
■H
en
SO
o
i-H
or;
cn
a-.
sr
o
o
in
i-l
en
o
o
CM
so
o
-7
O
r-4
m
en
r-l
m
st
en
o
m
o
CM
^3-
■a
C J
r ■
Si
H
vO
SO
CO
r-i
CM
CI
r 1
rH
</>
o
«
a.
OD
rH Os CO
O
CO
00 CO
m
<r
c
'.<
in co <r
so
O
CO 00
^
0*
ed
U
so cm m
CO
O
m o
00
a\
3 -u
jn a
oo a>
>.
4J
cn
u
^
OJ
hi
ex
c
0
■■■
Pm
a
O -<f 00 H CM SO CM
m r~ r^ oo sr cm st
SO CN in rH i— I SO CM
•> - « « I
CM CM VO OS ST o
<rmOOsrsOO>rHsrvOvOOsom
OCTs^rooinCTscor^cor^omr^
<r^*r~~*cMMcMoocMcor^inos
SOCO CMr^OOOmOsvOrHcMOO
r^-CM rH rH CO rH rH CM CO
I I I I I I
- I I I I I I I
00
c
■H
U1
•U
-75
rC
C
Ml
0
•H
CQ
r-J
B
0J
u
0
DO
rH
oj
id
X
>
cd
H
<
I I I I I I I I I I I
O-N
C-l
rH
CM
O
CM rH
sr
m
CO
m
CT.
cr>
rH
-.1"
cj
o
<r rH
t-t
-h
CM
sr
CM
co
en
cr.
r^
o
sr o
cn
H
CTi
CJ
c^
CM
00
rH
vo
rH
o o
SO
en
vO
rH
CO
CM
a)
co
rH
SO
U-l rH
CO
CJ
r-~
SO
n-
m
rH
CO
VO
CJ
in oo
i-l iH
CM
H
Cl
rH
cH
</>
CO
m tH
rH 00
•H iH
rH
co
o
CI
vo
sr
vD
CI
ST
CT>
vO
CO
VO
C4
rH
o
ro
rH
rH
co
CO
oo
o
rH
vO
<r
co
CO
r-
sO
vO
cH
OA
o^
ON
CM
CJ
m
CO
'-O
rH
CO
o
CO
in
rH
vO
VO
co
rH
CO
o
CO
CO
CO
oo
CI
OA
CO
r-~ CM
rH CM
SO
O
CO
co
sr
vO
CM
VD
H
cH
o
O
rH
CM
CO
O
o
CM
co
o
co
CJ>
rH
rH
rH
m
rH
CO
m
CO
o
rH
m
rH
m
VO
VD
CM
CM
St
CO
CO
CJ
St
vO
</>
m
<jy
mH N-ItOH
r-~ m cm o vo o
vo rH r- r^ i-H in
oo cm in m si" cm
-Jst m H H
r- rH iH rH
I I I I I
I I I I I
<finsor^cocriOtHcMcMsrinsor^ooasOrHcMco<rinsor~~
inmmminmsosovososOsosovovovDr^r^r^r^r^r^r^r^
I I I I I I I I I I I I I I I I I I I I I I I I
cocosrinsor-~cocr>0'HcMco<i'insoi~--oocriOi-HCMcosrinso
inmininmmininsosovosovosososososoi — i^ — r-~r-~r»r~»r^
CTvO^CTsOSCTsC^O^C)>CT»0>C7SOSO^C^
r- 1
C
4-1
ON VD
3
O T)
rH r^
!-n
3 C
U 3
•H
^-^
CJ
CXT3
rH
CM
CO
•H
<f
•O TJ
O
ON
C
01 0)
ca
rH
O
> >
14H
1
•H
o o
in
^
e e
TJ
co
cd
OJ <D
CJ
as
OJ
U U
C
rH
m
3=
^— '
o
CO CO
o
0,
C C
1
<
rt
o o
>^
12
•H ^H
4-1
P-
4J 4J
•H
>n
ft) I-i
•H
<C CO
ft ^
•H CJ C
58 -
CITY AND COUNTY OF SAN FRANCISCO
PUBLIC UTILITIES COMMISSION
DOCUMENTS D€W.
SAN FRANCISCO
PUBLIC LIBRARY
ANNUAL REPORT
FISCAL YEAR 1977-78
HETCH HETCHY WATER AND POWER SYSTEM
AND
BUREAU OF LIGHT, HEAT AND POWER
P 0t E L 1
0. L. MOORE
GENERAL MANAGER
CITY AND COUNTY OF SAN FRANCISCO
GEORGE R. MOSCONE - MAYOR
PUBLIC UTILITIES COMMISSION
JOHN F. HENNING, JR.
CLAIRE C. PILCHER
H. WELTON FLYNN
PETER McCREA
JOHN M. SANGER
JOHN B. WENTZ
President
Vice President
Commissioner
Commissioner
Commissioner
General Manager
ANNUAL REPORT
FISCAL YEAR 1977-78
HETCH HETCHY WATER AND POWER DEPARTMENT
ORAL L. MOORE - General Manager
This report is respectfully dedicated to
Hetch Hetchy employees, past and present,
whose devoted and conscientious efforts
have made possible these accomplishments
for San Francisco.
HIGHLIGHTS
In spite of a very poor first half, resulting from drought, and in spite
of rate limitations established by court order, Hetch Hetchy finished the
year with record high power revenues, both as to gross and net after
power purchases.
Starting with less than half full reservoirs at the beginning of the year,
a third dry year was very much a possibility. In order to create the
necessary funding to carry on operations in the face of potentially record
expenditures for purchased power, a substantial portion of the previously
budgeted capital improvements was rescinded. With heavy rains and snows
falling on our mountain watersheds throughout the winter, resulting in
spring runoffs which turned out to be the second highest recorded in the
last 60 years, the severe drought, which has impacted the Department's opera-
tions during the past two years ( ended and was replaced with a situation
where our powerhouses were scheduled for all-out generation during the last
half of the Fiscal Year. Combined with decreased power demands of the
Modesto and Turlock Irrigation Districts, the Increased generation permitted
Hetch Hetchy to sell much of its power at market rates in the last 6 months.
This enabled the Public Utilities Commission to transfer $6 million of the
Department's year-end surplus to the General Fund.
As noted later in the report, the remaining $3 million from this year's
surplus is earmarked for a reserve fund for protection of the City against
possible failure of current litigation involving Hetch Hetchy power rates.
To illustrate the remarkable turn-around of the last 6 months, a few selected
comparisons between the two halves of the year is revealing.
First 6 Months
Last 6 Months
1. Dion R. Holm Powerhouse Generation
54 million
kilowatthours
551 million
kilowatthours
2. Total Hetch Hetchy Generation
280 million
kilowatthours
1,121 million
kilowatthours
3. Expenditure for Purchased Power
4. Net Power Revenue (Gross Revenue
less Purchased Power)
$25.9 million
$5.2 million
$3.7 million
$15.8 million
5. Sales to Assigned Industrial
Customers
0 kilowatthours 207 million
$0.2 million kilowatthours
$7.9 million
- 1 -
HETCH HETCHY ORGANIZATION AND FUNCTIONS
Under policies established by the San Francisco Public Utilities Commission, the
HETCH HETCHY WATER AND POWER DEPARTMENT and the BUREAU OF LIGHT, HEAT AND POWER
serve the City and County of San Francisco in the dual function of operating
department and service bureau.
Hetch Hetchy is a municipally-owned system of storage reservoirs and aqueducts
which collects water from the Tuolumne River watershed and delivers it to the
San Francisco Water Department. As a by-product of falling water, Hetch Hetchy
operates and maintains hydroelectric generating stations and high voltage
transmission lines for the production and distribution of electric energy.
Through its Transit Power Division, Hetch Hetchy has funded, operated, maintained
and provided improvements for the electric facilities of the San Francisco
Municipal Railway since July 1, 1969.
In order to handle this additional responsibility, Hetch Hetchy assumed control
of the equipment and personnel of the Overhead Lines and Motive Power Sections
of the Municipal Railway.
All of Hetch Hetchy' s expenses, including those of the Transit Power Division,
are supported by water and power revenues.
The Bureau of Light, Heat and Power administers contracts for furnishing electric,
gas and steam services to municipal departments and handles monthly billings.
It also administers contracts for furnishing street lighting services and for
operation and maintenance of City-owned street lighting. Financing, design and
construction of City-owned street lighting improvements are under the juris-
diction of the Department of Public Works, and plans for these improvements
must be approved by the Public Utilities Commission through this Bureau. The
Bureau is financed by appropriations from municipal departments and gas tax
funds.
For fiscal year 1977-78, the Department administered budgeted funds for all
purposes as follows:
Budget
Hetch Hetchy Water and Power
Hetch Hetchy Water and Power
(Transit Power Division)
Bureau of Light, Heat and Power
Number of
Employees
224
59
_11
294
Total .Amount
Appropriated
$ 47,896,609
1,647,178
15,909,708
$ 65,453,495
2 -
HETCH IIETCIIY WATER AND POWER SYSTEM
REVENUE AND EXPENDITURES
Revenue from Ketch Hetchy Water and Power operations is derived principally from
two sources:
1. Sale of water to the San Francisco Water Department
2 . Sale of electric power and energy to San Francisco Municipal departments,
Modesto and Turiock Irrigation Districts in the San Joaquin Valley, and seven
industrial customers:
Kaiser Cement & Gypsum Corporation
Kaiser Aluminum & Chemical Corporation
Lockheed Missiles and Space Company, Tnc,
General Motors Corporation
TRM Corporation
Ltnuid Air, Inc.
Norris Industries, Riverbank
Santa Clara County
Santa Clara County
Santa Clara County
Alameda County
Santa Clara County
Alameda County
Stanislaus County
WATER SALES
This past year revenue from the sale of water and standby service to the San
Francisco Water Department was $7,175 million
POWER SALES
Cross sales of electric energy was 49,971,915 t and increase of 6,629,942 from
the $43,341 ,973 for 1976-77. The increase, by itself, appears substantial, but
the significance of the increase goes beyond these numbers for the following
reasons;
(1) The offset to this year's power revenue in terms of expenditure for
supplementary power and energy is $29,561,113, down from $33,921,500,
leaving a net revenue from gross of $21,123,114 for the year as compared
to $9,420,473 for 1976-77. This new high in net revenue replaced the
record $18 million achieved in 1974-75.
(2) The increase was achieved through the sale of power and energy
generated during the months of March through June 1978 when all
project plants were in maximum production in order to take full
advantage of the record inflow and, at the same time, to delay filling
of the reservoirs, thus minimizing spill.
Power and Energy delivered to the City Departments decreased 2.1 percent over
the previous year. The City department mainly responsible for this decrease is
the San Francisco Water Department whose consumption dropped 31.3 per cent. Due
to the effectiveness of both voluntary and mandatory water rationing programs
during the drought, there wan considerably less need for pumping and filtration
- 3 -
Miscel lo neous Revenue
$154,270
Toies
$641,031
Copilol Improvement
Ketch Helchy Project
$356,600
Administrotion
Operolion ond
Mointenonce
Transit Power
Division
$1,499,324
HETCH HETCHY REVENUES
AND EXPENDITURES
FISCAL YEAR 1977-78
of the domestic water supply. On the other side of the ledger, consumptions
of the Municipal Railway and the Unified School District for the year have
increased 7.5 per cent and 5 . 5 per cent respectively. The increase incurred
l>y the Municipal Railway Is directly related to the completion of the John M.
Woods Motor Coach Center and the Muni Metro Center, major facilities for the
storage and maintenance of motor coaches, streetcars and eventually the new
light rail vehicles. The magnitude of the increase incurred by the schools
(including the community colleges) is uncharacteristic of the load based on
historical records. A concerted effort in energy conservation might provide
the key to reducing this groving consumption. Besides the San Francisco Water
Department, consumption at the San Francisco international Airport also
decreased 1.8 per cent as compared to previous year. In the face of continuing
construction activities, this decrease seems to imply that energy conservation
practices by both managment and tenants might be bearing fruit.
Power and energy delivered to Modesto Irrigation District, perennially Hetch
Hetchy 's largest power customer, and to Turlbck Irrigation District, normally
the third largest but for 1977-78 the second largest, dropped 1.2 per cent and
2.6 per cent respectively this year. These decreases are directly related to
the dramatic ending of the drought which enabled the two Districts to supply
during the last 6 months over 244 million kilowatthours of energy from their
own generation as compared to 31 million kilowatthours in the first 6 months.
Total generation of 1,401,610,000 kilowatthours for the report year from the
project's three power plants represents a doubling of the 710,002,000 kilowatthours
for 1976-77 which had the unenviable distinction of being the lowest production
year since completion of the expanded system in 1969. The financial Impact of
the additional generation can best be demonstrated by a comparison of the sales
to the assigned industrial customers which are billed at current PCandE rates:
^pro kilowatthours for 1976-77 versus 210 million kilowatthours for 1977-78,
producing a revenue gain of $7.7 millions.
Two conflicting rulings rendered by U.S. District Court judges during the year
have affected our revenue from sale of Hetch Hetchy power. Both cases center
on the question whether prior approval of the Secretary of Interior is required
for rates charged by the San Francisco Public Utilities Commission for sale of
Hetch Hetchy generated power for commercial purposes. On September 15, 1977
Judge Cecil Poole, U.S. District Court for the Northern District of California,
rendered a summary judgment in favor of City in the case of City and County of
San Francisco vs. Various Airlines. Judge Poole ruled that the San Francisco
Public Utilities Commission has the legal right to set rates for Hetch Hetchy
power without approval of the Secretary of the Interior. The matter came to
issue when the Public Utilities Commission, following historical practice,
raised power rates to those prevailing in the service area in July 1975. The
airlines initially refused to pay, contending that Hetch Hetchy power rates
must be approved by the Secretary. On February 8, 1978. Judge Phillip Wilkins,
U.S. District Court for the Kastern District of California, rendered two
decisions in the case of the Modesto and Turlock irrigation Districts vs. City
and County of San Francisco. The case was initiated by the two Districts in
response to City's withdrawing of Class 3 Power (commercial power) from them
on July 1, 1976.
- 5 -
^->—
5 20
o
X
I
<
Q
2
o
Q
UJ
OS
o
l"5-
10-
0-
HETCH HETCHY
GENERATION
!<3-
|§ SUPPLEMENTAL
1968 1969 1970 1971 1972 1973 1974 1975 1976 1977 1978
(Year Ending June 30)
HETCH HETCHY ELECTRIC ENERGY SOURCES
50-
45
40-
l/l
35—
cr
<
_)
_J
o
30—
Q
U
O
?5-
in
^
o
20-
15-
10 —
5-
REVENUE DEDUCTION
FOR SUPPLEMENTAL
Flv!*:?
['•'•'-''■'J
!\vl"/
JvT^l
■■■■■.■/
1
REVE
NUE
:0R
AFT
SUPP
ER C
LEME
EDU(
NTAL
;tion
1968 1969 1970 1971 1972 1973 1974 1975 1976 1977 1978
(Year Ending June 30)
RFVFNIIF FROM SAI F OF Fl Ff.TRir. FNFRfiY
In favor of the City, the Judge held that the right of City to withdraw Class
3 Hetch Hetchy power and substituting it with power purchased from PGandE
involves a threshhold question of contract interpretation which, by virtue of
the arbitration clause in the contracts, must be referred to arbitration.
Against the City is the decision that the Secretary of the Interior must approve
Hetch Hetchy power rates and the City therefore is restrained from selling Hetch
Hetchy power for commercial purposes to any purchaser at rates not approved by
the Secretary. Notices of appeal have been filed by opponents of the decisions.
Even with the two cases now consolidated on appeal, resolution of the issues
appears a long way down the road.
Meanwhile, a reserve fund of $6,125 million is being established from this year's
remaining surplus and the anticipated surplus for 1978-79 to protect the City
from a substantial liability should the pending litigation be resolved against
the City.
Hetch Hetchy power is sold at cost to City Departments for municipal purposes,
representing a saving to taxpayers for 1977-78 of approximately $8 million,
compared to the cost if supplied by the local investor-owned utility at rates
which include a "fuel cost adjustment" to account for the high costs of non-
renewable fuels used for electric generation.
In a continuing effort to maximize return of the power produced from its own
system, Hetch Hetchy increased its rates for private consumers and municipal
users to the level of current market value on July 1977 and again on April 1978.
These increases would have more than doubled power revenue from the San
Francisco International Airport - from about $3 million a year to $6.9 million.
However, due to Judge Wilkin's decision as noted above, such hopeful gain was
not achieved. Under guidelines suggested by the City Attorney's office while
the injunction is being appealed, billing to the Airport tenants must revert
to the Pre- July 1, 1975 rates beginning with the month of March 1978.
SYSTEM PLANNING
As mentioned in the annual report last year about plans for initiating a weather
modification program in the Cherry watershed area to increase its water yield,
the City on December 1977 entered into a professional services contract with
Environmental Science Associates, Inc., Foster City, California, for the
preparation of an Environmental Impact Report. Steady progress is being made
on the report draft, with approximately 30 per cent completed as of the end of
the fiscal year.
- 7
WATLR PRODUCTION AND TRANSMISSION
Precipitation recorded for the year at our measuring stations was 159% of the
long term average.
During the year, 51,935, 400, 000 gallons of water were diverted from the
Tuolumne River watershed through the Iletch lletchy Aqueduct to the San
Francisco Water Department, representing 78% of the City's total customer
consumption. In addition, 199,7)3,204 gallons, down 9% from last year,
were delivered to the United States Atomic Energy Commission at Mocho
Shaft of the City's Coast Range Tunnel for use at the Lawrence Radiation
Laboratory at Livermore; 49,932,740 gallons, down 15% from 1976/77, were
delivered to Groveland Community Service District in Tuolumne County from
the Mountain Tunnel.
Appendix Table 6 shows comparative data on precipitation, runoff, storage
and delivery of the Iletch lletchy Water Supply System.
300,000 —
Q
UJ
o
LlI
LL
LlI
IX
<
200,000
100,000-
1 1973-74 ' 1974-75 ' 1975-76 ' 1976-77 ' 1977-78
DELIVERIES OF WATER TO
SAN FRANCISCO WATER DEPARTMENT
OPERATION AND MAINTENANCE - TRANSIT POWER DIVISION
The Transit Power Division is responsible for supplying the 600 volt direct
current power that is necessary to operate the streetcars and trolley coaches
of the San Francisco Municipal Railway.
The Transit Power Division is composed of two sections - the Motive Power
Section and the Overhead Lines Section.
Motive Power Section
The Motive Power Section presently operates and maintains sixteen substations
which convert electric power from 12,000 volts alternating current to 600 volts
direct current by means of motor-generators, synchronous converters, mercury
arc rectifiers and silicon rectifiers. (See Appendix Table 3 for statistical
data.) Motive Power is also responsible for maintaining the electric motors
and associated control equipment for operating the cable-winding machinery
located in the Cable Car Powerhouse at Washington and Mason Streets. In
addition, Motive Power periodically inspects, cleans, adjusts and repairs the
streetcar and trolley coach headway recorders at Central Control of the
Municipal Railway. The substations operate 24 hours per day, 365 days per year.
In anticipation of the need to assume responsibility for the eighteen new
substations being built by the Power Improvement Program (reported elsewhere
in this report) , this section perused and commented on the wiring and control
schemes proposed for these stations. The first of the new electrical
substations, Civic Center Station, was placed in revenue service in December
of 1976. Subsequently, in fiscal year 1977-78, nine new substations were
placed in service: Downtown, Church, Judah, Fillmore, Carl, San Jose, Randolph,
Taraval and Laguna Honda.
A mimic board showing the new stations in schematic form was modified to
incorporate these new stations at the Bryant Substation. As each new automatic
station was completed and became operational, it was monitored and controlled
from this remote location via telephone lines, since all the new stations are
presently unmanned. The controls for these stations were designed and installed
on this mimic board. This status display and control board will continually
be augmented with additional automatic station controls until such time as it
shall be superseded by a more sophisticated and flexible Supervisory Control
System.
Overhead Lines Section
The primary function of the Overhead Lines Section is to maintain in satisfactory
operating condition the trolley wire overhead facilities and the electric
distribution system which conveys power to it. This electric distribution system
consists of both overhead lines and underground cables.
Secondary functions include the maintenance of the Municipal Railway Signal
Systems and the electric light and power installations at all Municipal Railway
buildings.
- 9 -
During fiscal year 1977-78, the Overhead Lines Section responded to 3,649
emergency calls, a decrease of 8% over the prior year. In addition to emergency
calls, this section performed a regular and extensive ongoing maintenance pro-
gram. All overhead and underground facilities were systematically inspected and
all worn or damaged parts that could cause accidents or equipment malfunctions
were replaced. This section also operated an emergency crew 24 hours a day
year round, including all holidays. The main work crew normally worked on the
day shift but occasionally was assigned to night work to overhaul facilities
during the hours Muni trolleys and streetcars do not run.
A considerable amount of damage to overhead facilities was caused by trolley
coaches de-wiring and snagging their poles in the overhead facilities and
tearing them down, or by breaking the spans with the flaying poles. Such damage
was repaired at no cost to the Municipal Railway. Other parties who damaged
our facilities were billed for the cost of repairs. This included damage to
overhead facilities caused by high loads on trucks or careless operation of crane
equipment and damage to underground feeder cables by contractors digging into
our duct lines. During 1977-78, responsible parties were billed for 11 damage
cases totaling $6,946.34. The Overhead Lines Section also performed work for
19 building owners and contractors under work orders amounting to $23,587.32.
This work included moving trolley poles to accommodate driveways; relocating
trolley poles and feeders to permit construction of new buildings; temporarily
removing trolley wires and feeders to permit passage of high loads; and shifting
of trolley wires and feeders for various excavations.
The Overhead Lines Section engaged in many other activities of a related nature
which it is especially equipped to perform. These additional duties included
repairs, maintenance and construction of electrical systems in Muni's car barns,
offices and shops; welding and rebuilding of worn overhead lines special work;
making and rebuilding parts for switches, warning block signals, car recorders,
and strand alarms for the cable car system; installing mobile radio equipment;
installing streetcar and bus stop signs and public information signs.
- 10 -
ENGINEERING DIVISION
The Engineering Division of Hetch Hetchy Water and Power provides engineering
services for the Hetch Hetchy Project, Transit Power Division and the Power
Improvement Program. These services include the preparation of studies,
reports, cost estimates, and plans and specifications for new construction,
for replacement of structures and for items of major maintenance. Surveying,
inspection of construction, contract administration and payment recommendations
are provided for all construction work under Hetch Hetchy Water and Power.
Work of unusual magnitude or which requires special knowledge and expertise is
clone by engineering consulting firms which have the necessary manpower and
qualifications. The Engineering Division is organized into six main sections:
Civil and Construction, Electrical, Mechanical, Architectural, Engineering
Administration, and Special Projects (Power Improvement Program).
During the year, plans and specifications were prepared for the following work
to facilitate and maintain Hetch Hetchy operations:
HH-549 - Bryant Substation and Power Control Center (Under Power Improvement
Program)
Plans and specifications for the Bryant Substation and Power Control Center,
"Construct Building and Install Equipment", was completed in January 1978.
Hetch Hetchy Water and Power and our consultants, Bechtel Incorporated have
jointly prepared the plans and specifications. The Power Control Center portion
of the building was exclusively designed by Hetch Hetchy. The building will
be constructed on vacant City property, located adjacent to the existing
Bryant Substation. The substation will supply 615 volt D.C. traction power
to Municipal Railway trolley coaches. The Power Control Center will accommodate
facilities for a shop, offices, and a power system supervisory control room.
The PUC received bids on March 2, 1978, and the responsible low bid of $1,020,000
submitted by Moore Construction of San Francisco was approved and the contract
was awarded by PUC on March 14, 1978. Construction commenced in June 1978 and
completion of project is scheduled for July 1979. The Bryant Substation and
Power Control Center will complete the new substation construction program
under the Power Improvement Program (PIP) .
HH-566 - San Joaquin Valve House - Backflow Prevention and Replacement of
Miscellaneous Mechanical Work
Contract documents were prepared to prevent contaminated and polluted river
water in Elliott Cut from entering the pipelines when they are drained for
maintenance purposes in this area. The contract also includes the replacement
of certain mechanical appurtenances at the valve house, Oakdale meter house
and on the pipelines.
HH-57_0 -_Surface West Portal and Priest Roads
A construction contract was let to resurface and seal the service roads into
West Portal and Priest Reservoir to prevent the further deterioration of these
roadways .
- 11 -
HV1-577 - OakdaleJ?ortal Sand Trap
Plans and specifications have been prepared to construct a sand and gravel
trap in the existing manifold which connects the San Joaquin pipelines to the
Foothill Tunnel. The pipelines are being subjected to unusual wear along the
invert of the pipes, caused by sand and gravel carried from the tunnel into
these pipes. This contract will eliminate this source of wear to the pipelines.
HH-591 - Cherry Road Slide Repair
Plans and specifications were prepared for repairing a slide area on Cherry
Road near Cherry aqueduct tunnel portal 2-A by stabilizing the downhill slope
and by excavating into the upslope bank to relocate a portion of the roadway
away from the slide area.
HH-593 - Paint and Repair Downtown Substation (Under Power Improvement Program)
Plans and specifications have been prepared for the painting and repairs to
the existing substation building. Work includes carbon-dust debris removal
from building surfaces that was produced by the old rotary generators.
Existing large windows on Stevenson Street will be elevated for added security.
Interior and exterior painting and installation of additional lighting fixtures
will complete the work on this operational substation.
HH-595 - Moccasin Sewage Plant, Replace Sanitary Sewer
Plans and specifications were prepared and a contract let for replacing a
portion of the sanitary sewer in Moccasin Village which has deteriorated badly
over the years. Construction is scheduled to start in July 1978.
Moccasin Powerhouse, Turbine and Bypass Bulkhead Gates. A purchase contract
was let for the fabrication of structural steel gates which are required so
that inspection or maintenance work can be performed in the discharge side
of either unit separately, while the other unit remains in service. At
present, both units must be shut down to accomplish this work. Bids were
received in November 1977 with the gates to be delivered in July 1978.
- 12 -
During the months of February and March, the Foothill Tunnel and San
Joaquin Pipelines were shut down for inspection. The following
observations were reported:
Moccasin Re-regulating Reservoir
The bypass pipe is in good condition. The entrance to the Foothill
Tunnel and Moccasin gate tower slide gate are in good condition, showing
very little leakage with the reservoir elevation at 916. 0(+).
Red Mountain Bar Wasteway
The slide gate is in good condition. The concrete mortar lining D/S of
the gate had eroded in a number of places but were repaired during the
shutdown.
Foothill Tunnel - Red Mountain Bar Wasteway to Oakdale Portal
The Tunnel from Rock River Lime Treatment Plant to Red Mountain Bar is
in good condition; no slides nor blockages, but some water infiltration.
The Tunnel from Rock River Lime Treatment Plant to Oakdale Portal is in
excellent condition, with no new slides or blockages. Some infiltration
water into the Tunnel was noted and measured to be approximately 38 cfm.
The sand trap at Oakdale Portal surge shaft had collected no appreciable
amount of snad and the bulkhead was removed.
San Joaquin Pipelines
Pipeline No. 1 - The mortar lining was in good condition, showing no
erosion nor deterioration on the invert section with less than 1/16 in.
depth of the lining showing signs of "dead" mortar.
Pipeline No. 2 - The lining in this pipeline shows considerable deteriora-
tion since the last inspection three years ago. Some of this changed
condition is due to the cleaning attempts performed under HH Contract 511-R.
Areas of "dead" mortar have been removed along with small pieces of lining
adjacent to cracks and previous bare metal spots. The coal tar paint
east of Oakdale is doing an adequate job of protecting the mortar lining.
Pipeline No. 3 - The mortar lining on the invert of the line has eroded
to a width of 14 in. to 18 in. ; along this trough there remains a maximum
of 1/4 in. mortar and in much of the area bare metal has been exposed.
The remaining lining shows some deterioration due to leaching cement from
the mortar by the pure water from Hetch Hetchy Reservoir. The outer 1/16 in.
to 1/8 in. is "dead" mortar and can be removed by a single pass with a
sharp metal object. Below this "dead" mortar, the remaining 3/8 in. to
1/2 in. of lining is hard, sound mortar.
- 13 -
TrolLey Overhead Program (TOP)
The Public Utilities Commission has filled an application with the Department
of Transportation, United States of America, for a grant under the Urban Mass
Transportation Act of 1964, as amended, for a trolley coach overhead program
for the San Francisco Municipal Railway. The program will be administered by
Hetch Hetchy Water and Power since it is responsible for power distribution
to Municipal Railway trolley coaches. The Trolley Overhead Program (TOP) will
reconstruct and replace worn-out portions of the existing trolley coach system
and construct trolley coach interconnections, turnarounds and traffic adjust-
ments .
The estimated cost of the program is $12,692,000 of which $10,153,600 (80%)
will be funded by the Federal Government and $2,538,400 (207») will be funded
from Hetch Hetchy revenues.
Installation of Depth Sensor in Rock River Shaft of Hetch Hetchy Aqueduct
A transducer type depth sensor was installed in the Rock River Shaft of the
Hetch Hetchy Aqueduct with a signal cable connecting the sensor to a digital
readout indicator in the operator's office of the adjacent Lime Treatment
Plant. This installation permits the Moccasin operator to telephone the
operator of the Lime Treatment Plant and obtain the reading of the water
level indicator. By knowing the water level at the Moccasin Reservoir and
the water level at the Rock River Shaft, the flow in the aqueduct can be
readily determined. Prior to the installation of the depth sensor, it was
necessary to dispatch a man to the Oakdale Portal of the aqueduct to read
the pressure gauge.
- 14 -
Sale of Diseased Trees - Baseline Road - F.ast of Camp Mather
An Agreement to sell diseased Ponderosa and Sugar Pine Trees
located on Baseline Road East of Camp Mather on property owned by
the City and County under the jurisdiction of Iletch Hetchy Water
and Power was processed through the City Purchasing Department.
Under the Agreement, twenty-seven (27) trees were sold to Mr.
tl.irk J. Wienert, Jr., of Wienert Lumber Company. A payment of
approximately $4,500, based on terms of the Agreement was trans-
mitted by Mr. Wienert to the Purchasing Department for deposit in
a Iletch lletchy Water and Power account.
15 -
ENGINEERING DIVISION - Power Improvement: Program
Work during Fiscal Year 1977-78 under the UMTA-approved Federal Grant for the
Power Improvement Program was as follows:
1 . Project Status
As of the end of the fiscal year, approximately $32 million of the $50.5
million Project grant has been expended or encumbered. The professional
services contracts for engineering design are 957- completed. Forty-seven
contracts for construction work and material purchases have been completed
and seventeen are currently in progress. Ten of the eighteen substations
have been completed and are in service, and two additional are under
construction. The old Turk-Fillmore and West Portal Substations have been
taken out of service. Electrification of the Market Street Subway and
Twin Peaks Tunnel is completed and has been tested by operation of the new
Light Rail Vehicles. Conversion of the surface streetcar overhead trolley
system for pantograph operation is nearly completed on the "K" line, the
"N" and "J" lines are under construction, and the "L" and "M" lines are in
the final design stages. Thirty-six miles of the eventual forty-five miles
of underground duct lines are completed or under construction. Approximately
557o of the 1.5 million feet of underground feeder cable has been installed
and some of the abandoned overhead feeders have been removed. Details of
the various projects and contracts are in the following sections.
2 . Electrification and Overhead Conversion
A) Contracts
Construction was completed on Contracts HH-521, Market Street Subway
Electrification, Embarcadero Station to Duboce Portal and HH-531, Market
Street Subway Electrification, Duboce Junction to Eureka Station. On
November 7, 1977, the new electrification system was energized for the
first time. Fifteen circuit breakers were closed at the recently completed
Downtown, Civic Center and Church Substations, sending 600-volt dc power
through 35 miles of power cables feeding the new 3-1/2 mile, twin-tunnel,
overhead-catenary system. All circuits tested satisfactorily. On
November 8, 1977, the first electrically powered vehicle was operated
in the new subway. P.C.C. Streetcar No. 1008, outfitted with a LRV-type
pantograph, was run from the Eureka Station to the Embarcadero Station
and back, first at slow speed and then at speeds up to 40 mph. Operation
of the pantograph on the catenary tested satisfactorily. On December 16,
1977, the first LRV was operated in the subway. 50 mph speed runs were
made by a single LRV and, on December 22, 1977, the first two-car train
made its initial runs in the subway. Testing of the two LRVs in the
subway and on the existing and partially reconstructed surface overhead
trolley system continued. Additional test runs were made, with a single
LRV and a two-car train, confirming the operation of the pantograph and
the LRV on the new catenary system and power system. Final testing of
the new catenary system in the Market Street Subway, following minor
adjustments resulting from earlier testing, was satisfactorily completed
on June 23, 1978.
16 -
Construction neared completion on Contract HH-524, K Line Streetcar
Overhead System, Conversion for Pantograph Operation.
Construction neared completion on Contract HH-536, Streetcar Overhead
System, West Portal Avenue, Conversion for Pantograph Operation.
P[P and 'HP construction work was completed on DPW Contract 23,727 for
Ocean and Phelan Avenues Rechanneli zation, which included relocation
of trolley poles and the overhead trolley wire system, along with
Muni streetcar track relocation and rerailing.
Plans and specifications for Contract HH-532, "N" Line Streetcar
Overhead System, Church Street to Nineteenth Avenue, Conversion for
Pantograph Operation, and Sunset Tunnel Electrification, were
transmitted to UMTA for approval on August 5, 1977. The plans and
specifications were approved by UMTA on August 19, 1977. Bids were
received on September 15, 1977. The contract was awarded on September
27, 1977, to Amelco Electric, San Francisco, California, who submitted
the low bid of $441,552. The contract was certified by the City
Controller on November 8, 1977. Construction commenced on November
28, 1977.
Plans and specifications for the PIP and TIP portions of the Department
of Public Works (DPW) Contracts 23,919 and 23,920 - Judah Street, 19th
to 32nd Avenues and 32nd Avenue to LaPlaya, Street Improvement and
Track Reconstruction, which include replacement of trolley poles
and conversion of the streetcar overhead system for pantograph
operation, along with Muni streetcar track rerailing, were advertised
by the Department of Public Works on July 29, 1977 and August 30, 1977
respectively. Bids were received on August 31, 1977 and on September
21, 1977. Contract 23,919 was awarded on September 30, 1977, to Bay
Cities Paving and Crading, Inc., who submitted the low bid in the
amount of $1,333,215. Contract 23,920 was awarded on October 24, 1977
to Homer J. Olsen, Inc., who submitted the low bid in the amount of
$1,474,515. Construction commenced on both contract on December 7, 1977.
Plans and specifications for Contract HH-533, "J" Line Streetcar
Overhead System, Duboce Avenue to 30th Street, Conversion for
Pantograph Operation, were completed and transmitted to UMTA for
-approval on February 9, 1978. The plans and specifications were
approved by UMTA on February 16, 1978. Bids were received on March
30, 1978. The contract was awarded on April 11, 1978, to L. K. Comstock
& Co., who submitted the low bid in the amount of $576,990. The
contract was certified by the City Controller on May 8, 1978. Construction
work commenced on May 22, 1978.
The manufacturer, Ohio Brass Co., completed fabrication of the special
trolley coach/streetcar crossing hardware (Contract No. 2). The
special hardware was delivered on January 6, 1978. The hardware will
be installed under Contract HH-533.
- 17 -
B) Design
The consultant, PBQ&D, Inc. and Cibbs & Hill, Inc. (PBGH) completed
design work on contract plans and specifications.
Final plans and specifications for Contract HH-534, "L" Line
Streetcar Overhead System, West Portal Avenue to Wawona Street,
Conversion for Pantograph Operation, were received from the consultant
on October L4, 1977. Advertising of the contract was deferred until
completion of rcrailing work by Muni. Final contract documents are
being prepared for advertising in October, 1978.
Final plans specifications for Contract HH-535, "M" Line Streetcar
Overhead System, St. Francis Circle to Plymouth and Broad Streets,
Conversion for Pantograph Operation, were received from the consultant,
PBGH, on February 3, 1978. Advertising of the contract was deferred
until completion of rerailing work by Muni. Final contract documents
will be prepared for advertising in December, 1978.
Work commenced on preparing the plans and specifications for the
final relocation and conversion to pantograph operation of the overhead
trolley wire system within the limits of the new West Portal Station.
The information will be transmitted to BART and the work will be
performed under an allowance in BART Contract 1S0041.
Work commenced on preparing plans and specifications for the purchase
and installation of special overhead hardware to permit temporary
PCC streetcar operation at the Muni Metro Rail Center. The new
overhead system being installed under Contract MR-609 was designed
for LRV pantograph use only.
Substations
A) Contracts
Construction was completed on Contract HH-522, Civic Center, Church,
and Downtown Substations, Installation of Electrical Equipment. On
October 19, 1977, Unit No. 2 (4,000 kw transformer and rectifier) was
energized and placed in operation at Downtown Substation. This
completed the final phase of the equipment conversion and put the
substation in full service.
Construction was completed on Contract HH-528, Laguna Honda and Judah
Substations, Construct Buildings and Install Equipment. On October
25, 1977, the new 3,000 kw transformer and rectifier at Laguna Honda
Substation were energized. Final connections in the Twin Peaks Tunnel
were made in November 1977 and the substation was placed in service on
December 16, 1977.
Construction was completed on Contract HH-529, Carl Substation, Construct
Building and Install Equipment. On February 10, 1978, the 12 kV electric
service connections were completed and the two 3,000 kw transformer-rectifier
- 18 -
units were energized. On March 11, 1978, after connections were made
to feeder cables outside the substation (under Contract HH-552) , the
substation was placed in service and began supplying power to the "N"
Judah Streetcar line from Ninth Avenue to Church and Duboce (Including
the Sunset Tunnel).
Construction was completed on Contract HH-544, Fillmore Substation,
Construct Building and [nstall Equipment, on .January 31, 1978. On
January 13, 1978, the 12 kV electric service connections were completed
and the two 6,000 kw transformer-rectifier units were energized. On
March 31, 1978, after connections "ere made to feeder cables outside
the substation (under Contract HH-540), the substation was placed in
service and began supplying power to various trolley coach lines.
Construction was essentially completed on Contract HH-546, Randolph
Substation, Construct Building and Install Equipment. On March 16,
1978, the 12 kV electric service connections were completed and
the 3,000 kw transformer-rectifier unit was energized. The substation
will supply power to the "M" Streetcar line when service is resumed
following the current rerailing project.
Construct ion was essentially completed on Contract HH-547, San Jose
Substation, Install Equipment. On March 15, 1978, the substation was
placed in service. The 4,000 kw transformer-rectifier unit began
supplying power to the new Muni Metro Center and to the streetcar
lines Ocean Avenue.
Construction was completed on Contract HH-548, Taraval Substation,
Construct Building and Install Equipment. On May 16, 1978, the 4,000 kw
transformer-rectifier unit was energized and placed in service supplying
power to the "L" streetcar line on Taraval Street.
Plans and specifications for Contract HH-549, Bryant Substation and
Power Control Center, Construct Building and Install Equipment, were
completed and transmitted to UMTA for approval on January 26, 1978.
The plans and specifications were approved by UMTA on February 8,1978.
Bids were received on March 2, 1978. The contract was awarded on
March 14, 1978 to Moore Construction Co., San Francisco, California,
who submitted the low bid of $1,020,000. The contract was certified
by the City Controller on April 5, 1978. Construction work1 commenced
on April 24, 1978.
Plans and specifications for Contract HH-550, West Portal Substation,
Install Equipment, were completed and transmitted to UMTA for approval
on November 23, 1977. The plans and specifications were approved by
UMTA on December 13, 1977. Bids were received on December 21, 1977.
The low bid, in the amount of $244,300, was submitted by L. K. Comstock
& Co. However, the low bidder, and the second and third bidders,
failed to meet the Minority Business Enterprise and Affirmative Action
requirements. All bids were rejected by the Public Utilities Commission
on January 10, 1978, and the contract was readvertised as Contract
1IH-550R, West Portal Substation, Install Equipment. Bids were received
on February 2, 1978. The contract was awarded on February 14, 1978
to Emil J Wrber Electric Co., San Francisco, California, who submitted
the low bid of $220,033. The contract was certified by the City
- 19 -
Hon t roller on March 13, 1978. Construction work commenced on April 3,
19/8. On May 31, 1978, the old West Portal Substation was shut down.
The existing equipment was removed and placed In storage for later
installation at Richmond Substation under Contract 1IH-551. The
existing structure was demolished by BART to enable completion of
the new West Portal Station.
Feeder cable connections were completed under Contracts HH-540 and
1111-55"? to transfer circuits and loads from the old Turk Substation
to the new Fillmore, Carl, Civic Center and Church Substations. On
April 20, 1978, the final circuit change was completed and Turk
Substation was taken out of service. Following removal and salvage
of equipment belonging to Pacific Gas and Electric Company and the
City, the building will be disposed of by MunL.
13) Design
Work resumed on the completion of final plans and specifications
for Contract 1111-545 , Outer Mission Substation, Install Equipment.
The work had been deferred until the completion of the new San Jose
Substation under Contract 11H-547. Following the energizing of San
Jose Substation, Outer Mission Substation was temporarily shut down
and the old mercury-are rectifier was removed and replaced by the
new 750 kw slllcon-di.ode unit. The work was done by the Transit
Power Division personnel. The station trolley coach load was carried
by the San Jose Substation. Contract HH-545 will complete the
substation rehabilitation and furnish and Install auxiliary equipment.
Work resumed on the completion of final plans and specifications for
Contract HH -551, Richmond Substation, Install Equipment. The work
had been deferred until the equipment from the old West Portal Substation
became available as a result of work under Contract HH-550R. The
equipment will be installed at Richmond Substation to replace obsolete
rotating machinery.
Work commenced on the preparation of plans and specifications for
Contract HH-597, Laguna Honda Substation, Install Additional Equipment.
The additional equipment consists of the second rectifier unit to
provide power reliability in the Twin Peaks Tunnel, as approved In
the Project Amendment.
Work commenced on the preparation of plans and specifications for
Contract 1IH-598, Civic Center and Church Substations, Escape Hatches
and Related Work. This contract will construct emergency exists
from the underground substations that were not provided in the
original construction of the structures by CART.
C ) Equipment Purchase
Modification No. 3 to the purchase contract with ITE-Could, the
equipment supplier, to provide additional equipment for Laguna Honda
Substation (a second rectifier, transformer and related switchgear)
was submitted to UMTA for approval on July 6, 1977. The modification
of contract, in the amount of $357,367, was approved by UMTA on
August 11, 1977. The modification of contract was executed on August
25, 1977.
- 20 -
Modification Uo. 6 to 'he purchase contract, Lo provide addltLoual
feeder circuit breakers for Downtown, Civic Center and Church
Substations, in the amount of $136,907, «,« submitted to UMTA for
approval on June 23, 1978. The additional breakers are required to
maintain trolley coach service on Market Street which had been
scheduled to be rerouted to Mission Street in the original plan.
The substation equipment manufacturer, [TE-Could, completed deliveries
to the local warehouse o£ the additional equipment for Laguna Honda
Substation (the second rectifier, transformer and related switchgear)
ordered under contract Modification Mo. 3.
Substation equipment, furnished to the City under the purchase
contract and stored by ITE -Could at the local warehouse, was received
at the warehouse by the City's installation contractors and transported
to and installed in the various substations. All equipment, except
for Bryant Substation and Laguna Honda Substation addition, has been
delivered to the sites.
The Service Engineer, assigned by 1TE -Gould to assist during installation
and testing of Che new equipment, continued to provide assistance, as
requi red .
Work continued on the preparation of plans and specifications for the
purchase of additional substation equipment for Stations E, F, J and N.
U . Control and Communication
The consultant, Systems Control, Inc., submitted final plans and specifications
for Contract HH-569, Supervisory Control System - Equipment Purchase and
Installation on December 9, 1977. Final contract documents are being
prepared.
The consultant continued "ork on the plans and specifications for
Contract HH-574, Communication Cable and Subway Maintenance Telephone
System Installation.
5. Cable Purchase
243,000 feet of cable previously ordered under the contract with Cyprus
Wire & Cable Co. was received and delivered to various installation
contractors. These deliveries completed receipt of the 780,000 feet of
cable ordered under the purchase contract.
Bids were received by the City Purchaser on July 8, 1977 for a second
purchase contract to provide the estimated 650,000 feet of insulated
power cable required to complete the planned work under the Power
Improvement Program. Review of the seven bids submitted indicated
that the bid submitted by Phelps Dodge Cable & Wire Co., the second low
bidder, was the lowest responsive bid. Supporting data was sent to
UMTA along with a request for approval to award the contract. Approval
was received from UMTA and the contract was awarded by the City Purchaser
- 21 -
Co Phelps Dodge Cable & Wire Co. on September 29, 1977. Approximately
31,000 feet of insulated power cable was delivered by Phelps Dod,ge Cable
& Wire Co. to our contractor, Amelco Electric Co., for installation In
the Sunset Tunnel under Contract HH-532. An additional 35,000 feet of
cable was order for Contract HH 578.
6 . Feeder Underground Ing
A) Juclah Street ■ 7.0th to 48th Avenues - Underground Power Facilities
(Contract HH-523)
All work on this contract was completed In accordance with contract
plans and specifications on May 18, 1978.
B ) . 1, N, No. 22 and 33 Lines, Underground Power Facilities (Contract HH-552)
All work on this contract was completed In accordance with contract
plans and specifications on May 5, 1978.
C ) Folsom and Howard Streets, Eleventh Street to Main Street - Underground
Duct System (Contract HH-559)
All work on this contract was completed in accordance with contract
plans and specifications on November 16, 1977.
U) llalght Street - Stanyan to Cough - Underground Duct System (Contract HH-560)
All work on this contract was completed In accordance with contract
plans and specifications on September 16, 1977.
E ) Fillmore, lackson, Presidio and Other Streets - Underground Duct System
(Contract I1H-561)
All work on this contract was completed In accordance with contract
plans and specifications on October 10, 1977.
F) Fulton and McAllister Streets - 8th Avenue to Dlvlsadero Street -
Underground Duct System (Contract HH-562)
All work on this contract was completed in accordance with contract
plans and specifications in December 1977.
G) Ocean Avenue and Phelan Avenue Rechannellratlon and Track Reconstruction
(I)PW Contract 23,727)
All PIP work was completed on DPW Contract 23,727 for Ocean and
Phelan Avenues Rechanne lira tion, which Included the undergroundlng
of feeder cables, along with Muni streetcar track relocation and
rerailing.
1 1 ) Sutter, McAllister and Fillmore Streets - Underground Power Facilities
and Related Work (Contract HH-540)
The Contractor essentially completed the contract work on Installation
of feeder cable In duct lines constructed under Contract HH-525 and HH-526.
- 22 -
1) Hayes Street - Van Ness to Stanyan - Underground Duct System (Contract
HH-567)
Bids were received on July 21, 1977 for constructing manholes and
underground duct banks in Hayes Street between Van Ness Avenue and
Stanyan Street. The contract was awarded on August 9, 1977 to
Underground Construction Co., Inc., San Leandro, California, who
submitted the low bid of $363,288. The contract was certified by
the City Controller on August 25, 1977. Construction work commenced on
September 12, 1977. All work on this contract was completed In
accordance with contract plans and specifications on March 7, 1978.
J) Ocean, San lose and Onondaga Avenues, Underground Power Facilities
and Related Work (Contract HH-578)
Plans and specifications were completed for the installation of
feeder cables In duct banks constructed under DPW Contract 23,727
and Contracts MR -620 and HH-537.
Also Included in this contract is the removal of overhead feeders
on Ocean Avenue from Junipero Serra Boulevard to Mission Street
and on San Jose Avenue between Ocean Avenue and Geneva Substation.
The plans and specifications were transmitted to UMTA for approval on
December 12, 1977, and were approved by UMTA on December 19, 1977.
Bids were received on January 12, 1978. The contract was awarded on
January 24, 1978 to L. K. Comstock & Company, Inc., San Francisco,
California, who submitted the low bid of $123,185. The contract was
certified by the City Controller on March 7, 1978. Construction
commenced on March 27, 1978.
K) Union, Parnassus and Clayton Streets - Underground Duct System
(Contract HH-579)
Plans and specifications for constructing manholes and underground
duct banks in Union, Parnassus and Clayton Streets were completed
and transmitted to UMTA for approval on August 29, 1977. The plans
and specifications were approved by UMTA on September 14, 1 *> 7 7 - Bids
were received on October 13, 1977. The contract was awarded on
October 25, 1977 to Homer J. Olsen, Inc., Union City, California, who
submitted the low bid of $318,350. The contract was certified by
the City Controller on November 8, 1977. Construction commenced on
November 28, 1977. All work on this contract was completed In
accordance with contract plans and specifications on June 9, 1978.
L ) Mission, Bryant, Ala meda, 16th, 14th and 8th Streets, and South Van
Ness Avenue Underground Duct System (Contract HH-580)
Plans and specifications for constructing manholes and underground
duct banks in Mission, Bryant, Alameda, 16th, 14th and 8th Streets,
and South Van Ness Avenue were completed and transmitted to UMTA
for approval on January 26, 1.978. The plans and specifications
were approved by UMTA on February 6, 1978. Bids were received on
February 16, 1978. The contract was awarded on February 28, 1978 to
- 23 -
Underground Construction Co., [nc.f San Leandro, CalLfornia, who
submitted the low bid of $530,353. The contract was certified by
the City Controller on March 13, 1978. Construction commenced on
April 3, 1978.
M) California Street, Eighth Avenue and 32nd Avenue - Underground Duct
System (Contract HH-581)
Plans and speci fications for constructing manholes and underground
duct banks in California Street between Parker and 32nd Avenues,
in 8th Avenue between California and Fulton Streets, and in 32nd
Avenue between California and Clement Streets were completed and
transmitted to IJMTA for approval on April 17, 1978. The plans and
specifications were approved by UMTA on April 25, 1978. Advertising
of contract is awaiting scheduling with other work.
N ) lit oad Street and Son Jose Avenue, M-Ltne Track Extension, Power
Facilities and Sewer Replacement and Enlargement (Contract MR-644)
Bids were received by TIP on March 7, 1978 for Contract MR-644,
Broad Street and San Jose Avenue, M-Line Track Extension, which
includes construction of manholes and underground duct banks in
San Jose Avenue and Broad Street from Plymouth Avenue to Mt. Vernon
Avenue, for the Power Improvement Program. The contract was awarded
on March 28, 1978 to Homer J. Olsen, Inc., who submitted the low bid
of $667,339, which includes $118,250 for PIP work. The contract was
certified by the City Controller on May 8, 1978. Construction
commenced on May 15, 1978.
0) San Jose Avenue - Mt . Vernon Avenue to Metro Center, M-Llne Track
Extension (Contract MR-657)
Work continued on the preparation of plans and specifications for
the PIP portion of work to be included in Municipal Railway Contract
MR-657 for San Jose Avenue, M-Line Track Extension. The work to be
included consists of construction of manholes and underground duct
banks in San Jose Avenue from Mt. Vernon Avenue to the Metro Center.
P) South Van Ness Avenue - 16th Street to Army Street and Army Street -
South Van Hess Avenue to Mission Street - Underground Duct System
"(Contract HH-582)
Q) Mission Street - Army Street to Geneva Avenue - Underground Duct
System (Contract HH-583)
R ) Mission Street - 2nd Street to Embarcadero, 3rd and 4th Streets -
Market to Townsend - Underground Duct System (Contract HH-584)
Work commenced on the preparation of plans and specifications for
constructing manholes and underground duct banks. Feeder cables will
be installed in these duct banks under later contracts.
- 24 -
S ) f installation of Folsom Street Trolley System (Contract HH-448)
Work continued on the preparation of plans and specifications
for the underground! ng of feeders (PIP portion of the work) to be
Included in Contract 1111-448).
T) Fillmore, Jackson, Presidio and Union Streets - Underground Power
Facilities (Contract HH-585)
Work commenced on the preparation of plans and specifications for
the installation of feeder cables in duct banks constructed under
Contracts HH-561 and HH-579.
U) Bryant, Alameda and 16th Streets - Underground Power Facilities
Contract HU-586)
Work commenced on the preparation of plans and specifications for
the installation of feeder cables in duct banks constructed under
Contract Hll-563, and in duct banks being constructed under Contract
11H-580.
V) Western Addition Area - Overhead Feeder Removal (Contract HH-592)
Work commenced on the preparation of plans and specifications for
the removal of overhead feeders which were replaced by underground
feeder cables under Contracts Hll-491, UH-540 and HH-552.
- 25 -
BUREAU OF LIGHT, HEAT AND POWER
STREETLIGHTING
General
The lighting of public streets within the City of San Francisco is provided by
facilities which are, on a City-wide basis, 44.2% owned by the City; 54.0%
owned by the Pacific Gas and Electric Company; and a small percentage, 1.8%,
jointly owned. In the underground areas, where the economic advantage of City
ownership is greatest, 82.77., of the lights are City-owned. Five years ago,
the corresponding figure was 80.27,.
In fiscal year 1933-34, the cost for street lighting was $1.25 per capita; last
H e §r , w i th approximately thirty times _a s much 1 i gh t _o n the streets and public
thoroughfares, the cost per capita was approximately $2.49.
Maintenance and repair of City-owned installations were performed under two
contracts. One provided for group replacement of lamps in accordance with
schedules developed by the Bureau. A second contract covered work required
for repair of damaged and defective equipment, painting and miscellaneous
maintenance.
Under contract, the Pacific Gas and Electric Company furnished streetlighting
service as directed, including the furnishing, maintenance and operation of
Company-owned facilities. Certain services were provided also for City-owned
facilities, including switching and control replacement of individual lamps
and globes, and emergency work required during other than normal working hours.
Electric energy for all City and Company-owned streetlight operation was
supplied by the Hetch Hetchy power system.
Engineering
The Bureau reviews, reconmends changes, approvals or rejections of, and correlates
all streetlighting installations, including that done by the Department of
Public Works, the Pacific Gas and Electric Company, the State of California,
subdividers, etc.
During the fiscal year 1977-78, 10 streetlighting contracts, involving a total
of 495 new streetlights, were approved by the Public Utilities Commission.
Plans were submitted for approval only after careful checking to determine that
illumination will exceed the minimum requirements established by the American
National Standards Institute; and that all materials used, and manner of
installation, meet with the applicable local, state and federal rules, regulations
and statues governing the installation of electrical works.
- 26 -
BUREAU OF
REVENUES
FISCAL
LIGHT, HEAT & POWER
AND EXPENDITURES
YEAR 1977-1978
UTILITY SERVICES _T0 MUNICIPAL DEPARTMENTS
General
Electric energy supplied to municipal departments is generated on the Hetch
Hetchy power system and delivered to various service points by transmission
and distribution facilities of Pacific Gas and Electric Company under a
wheeling contract. Natural gas and steam supplied to municipal departments
are furnished by the Pacific Gas and Electric Company under a service contract,
Municipal Consumption of Electricity, Gas and Steam
During the fiscal year, 489,325,403 kilowatthours of electrical energy were
consumed through 1,072 municipal accounts at an expenditure of $10,573,618.
Of the above, 152,224,799 kilowatthours of energy were supplied to the San
Francisco International Airport for resale to tenants. Natural gas
consumption was 16,484,928 therms through 550 accounts at a cost of $3,623,447
There were several increases in gas rates last year which increased the cost
to municipal accounts by approximately $435,000. The average cost per therm
increased by approximately 127».
A summary of consumption and expenditures for these commodities is shown in
Tables 12 and 13.
- 28 -
Operation and Maintenance
As of June 30, 1978, a total of 37,544 City-owned and Company-owned streetlights
were in service to the public streets, parks, viaducts, overcrossings, tunnels
and underpasses. A summary of the number and type of units in service at the
end of fiscal year is shown in Appendix Table 14.
A total of $1,740,591 was expended for operation, maintenance, and repair of
the streetlighting system. Of the total cost, $22,631 was paid by the State
for its share of the operation and maintenance of streetlighting at intersections
on City streets, which are part of the State Highway system.
During the fiscal year, there were 149 accidents involving damage to City-owned
streetlighting property. Investigation was made, as soon as possible, to
remove hazards to the public and obstructions to traffic. Total cost of repairs
to damaged City-owned streetlighting property was $139,679. Every effort was
made to secure reimbursement for damages incurred from responsible parties.
Previous experience indicates that more than half of the repair costs will be
recovered.
Complaints
During the year, 39 complaints requiring field investigation were received and
acted upon. These complaints concerned inadequate illumination, objectionable
glare in windows, and requests for temporary and permanent relocation of street-
lighting poles.
Improvements
During the fiscal year 1977,78, a total of 543 new City-owned streetlights were
placed in service at a cost of $913,585. Improvements were financed by State
Gasoline Tax and the 1964 and 1972 Streetlighting Bond Issue as indicated in
Appendix Tables 16 and 17.
- 29 -
TABLE 1
HETCH HETCIIY WATER AND
POWER
SUMMARY
OF
RECEIPTS, EXPENDITURES
AND TAXES
FISCAL YEAR 1977-
78
RECEIPTS
Budget
Actual
-Under, Over
Revenue from Sale of Electrical
$ 42,083,030
$ 49,971,915
$ 7,888,885
Energy
Revenue from Sale of Water
7,175,000
7, 175.00C
i
and Standby Charge, SFWD
Other Revenue
100,000
154,270
1
54,270
Total Revenue
$ 49,358,030
$ 57^301^185
$ 7,943,155
EXPENDITURES
Total Expenditures
$ 49,543,787
$ 48,248,729
i
$-1,295,058
TAXES
Total Amount
Tax Levying Entity
No. of Bills
10
Assessed Values
$ 2,650.00
of Taxes
A]ameda County
$ 310.74
San Joaquin County
12
49,375.
00
4,880.22
San Mateo County
16
4,245.
00
349.16
Stanislaus County
80
136,320.
00
13,404.52
Tuolumne County
43
6,642,856.
00
621,176.64
P.anta-Carbona Irrigation Dist
1
4,391.
16
188.82
Oakdale Irrigation Dist.
4
26,710.
00
552.20
West Stanislaus Irrigation Dist.
1
4,250.
00
168.30
Total
167
$ 6,870,797.
16
$ 641,030.60
TABLE 2
HETCH HETCHY WATER AND_PqWER*
COMPARISON OF BUDGETED AND ACTUAL EXPENDITURES (INCLUDING ENCUMBRANCES^
FISCAL YEAR 1977-78
OE DESCRIPTION
110 Permanent Salaries $
110-1 Permanent Salaries - Crafts
111 Overtime
1 1 1-1 Overtime - Crafts
1 12 Holiday Pay
1 13 Extended Workweek
113-1 Extended Workweek - Crafts
120 Temporary Salaries
120-1 Temporary Salaries - Crafts
139 Permanent Salaries - Garderners
200 Contractual Services
216 Maintenance and Repair of Autos
231-1 Purchase of Power for Resale
231-2 Service Charge for Transm. and Dist .
251 Subsistence and Care of Persons
269 Other Professional Services
300 Materials and Supplies
389 Subsistence
640 Water Rights and Damage Claims
641 Hydrography
801 Accident Compensation
804 Claims
812 Fidelity Insurance
813 Automobile Insurance
814 Fire Insurance
815 Miscellaneous Insurance
853 Assessments
854 Membership Dues
855 Watershed Protection-Natl Park Service
855 Fee to U.S. Govt. - Raker Act
856 Maintenance of Roads - Raker Act
860 Retirement Allowances
862 Social Security
865 Health Service System
870 Taxes
880 Rental of Offices
900 Services of Other Departments
BUDGET
Actual
-UNDER, OVER
808,368
$ 767,509
$ -40,859
1,160,413
1,072,563
-87,850
15,680
14,147
-1,533
85 , 300
76,929
-8,371
2,620
2,609
-11
4,280
2 , 684
-1,596
10,460
10,460
-
57,288
33,750
-23,538
175,000
154,397
-20,603
54,566
54,535
-31
84,327
77,218
-7,109
10,000
8,267
-1,733
0,600,000
29,926,961
-673,039
2,898,000
2,637,700
-260,300
3,500
2,489
-1,011
64,500
62,564
-1,936
171,402
183,780
-12,378
16,305
12,276
4,029
1,000
-
-1,000
56,900
56,900
-
45,335
35,128
-10,207
500
-
-500
82
82
-
28,734
28,734
-
35,027
35,027
-
43,315
39,498
-3,817
48,614
40,304
-8,310
366
559
193
10,000
10,000
-
30,000
30,000
-
35,000
35,000
-
646,316
646,316
-
136,963
137,259
296
87,958
85,094
-2,864
641,031
641,031
-
62,400
62,400
-
935J.91
929,194
-5,997
TOTAL OPERATION AND MAINTENANCE $39,066,741
400 Equipment 107,400
500 Additions and Betterments 145,000
700 Facilities Maintenance 211,600
830 Bond Interest and Rdemption 8,365,868
TOTAL $47,896^609
$37,913,364
113,573
145,000
211,600
8,365,868
$-1,153,377
-6,173
i^^t.9^405 iLL.lit!i204_
* Does not include Transit Power Division
Heat and Power - Table 11.
Table 4 of Bureau of Light,
o o o
o o o
m in o
o
o
O
o
VO
t^
tH <-4 <r
t-H
iH
f-H
.H
r^
r^
CM CNI CM
O
<T>
o>
On
o>
<j\
o> cr> cr>
S
o
U
(0
CO
XI
o
O
M
>
o
o
x\
A
►o
<D
0)
•H
u
n)
.H
■u
c
>
a
•a
rH
H
C
3
01
•H
X\
3
•H
cfl
cd
O
o
O
u
•->
fn
U
CO
00
r-
"0
r -
01
o
c^
4~>
-o
iH
rl
0)
>
^
>
BJ
c
O
i!
o
O
►«
u
kC
H
ttj
o
m
5
«j
u
n
■H
te
4-1 CU WO
S co
II
II
cd
T-i
-a
o-<:
s
3
0)
•H
cd
2
DS
u
CO
CO
<f
c
T3
U
rH
CD
m
CD
ON
01
o
•H
rH
43
<-{
>4-l
M
•H
s
CU
u
4J
4-1
•H
4J
o
C
U
M
3
0)
0)
3
0)
CO
M
O
>
0)
0)
CO
m
c
>
I-"
3
cd
o
o
id
ex
o
s
4J
C_)
x:
u
cd
Q)
•H
13
u
CO
CO
x
tH
3
0)
3
■u
4-1
•H
cd
c
O
•H
co
u
c
a
>>
a
o
o
o
M
e
o
1
14
M
4-1
M
x:
cd
01
to
o
o
O
T3
a
4-1
&
01
O
•H
o
rH
O
B
Xi
s
CO
43
4-1
CO
cd
X
cd
H
II
0)
id
4-1
&
o
<D
•H
u
•H
-o
s
4-1
1
CJ
s
O)
cd
X
CO
0)
4J
0)
3
c
x)
CO
01
cu
• •
4J
B
rH
•u
4J
o
a.
rH
c
o
3
•H
cd
01
c
3
4-1
B
O)
cr
CO
Q.
<D
V-i
0)
s
•H
u
cd
•H
3
cd
s
cr
>,
o
>N
w
4->
CU
•H
rH
cd
X
CO
rH
a
x
4-1
M
cd
o
4-1
0)
s
■H
QJ
>
•H
01
CO
CO
s
(30 •
H
4J
3
o
VH rH
01
•H
cd
o
M CN
>
3
o
O ON
c
3
oi
0)
rH
o
X
X
<u
u
CO
4->
rl 3
0)
T3
CU -H
m
4->
3
CU
s
o
cd
c<j
O
cu
o
cd
CO 3
u
•H
4-)
rH
4-> 3
ex
T3
CO
D.
•H (U
X
3
O
0)
c >
H
l-l
o
M
t= <:
cd
ca
>
c
cd
3
u
M
cd
n)
H
►J
TABLE 4
HETCH HETCHY WATER AND POWER
TRANSIT POWER DIVISION
COMPARISON OF BUDGETED AND ACTUAL EXPENDITURES
(INCLUDING ENCUMBRANCES)
FISCAL YEAR 1977-78
OE
110
110-1
111-1
112-1
120-1
200
203
300
801
860
862
865
900
400
DESCRIPTION
Permanent Salaries
Permanent Salaries - Crafts
Overtime - Crafts
Holiday Pay - Crafts
Temporary Salaries - Crafts
Contractual Services
Use of Employees' Cars
Materials and Supplies
Accident Compensation
Retirement Allowances
Social Security
Health Service System
Services of Other Departments
TOTAL OPERATION AND MAINTENANCE
Equipment
TOTAL
-UNDER
BUDGET
ACTUAL
OVER
$
83,815
818,878
99,700
15,000
10,000
10,864
2,900
53,598
20,665
228,174
59,328
35,071
195,785
$
51,847
720,045
103,720
15,000
7,108
2,849
2,588
42,997
13,224
228,174
59,443
33,935
207,670
$
-31,968
-98,833
4,020
-2,892
-8,015
-312
-10,601
-7,441
115
-1,136
11,885
$
1,633,778
13,400
$
1
,488,600
10,724
$
-145,178
-2,676
$
1,647,178
$
1
,499^324
$
-147,854
o
00
u
is
c
n)
-H
0)
14-1
U
r^
0
S
-H
m
■
3
0)
0
r-t
d
W
<fl
0
T-l
>
Q
h
H
i->
g
O
C
cd
0)
•H
M
u
00
4-1
■H
•H
C
M
M
O
P-.
O
u
tti
w
3
0
s
co
H
Q
U
oo
s
l
r~
1
pi
55
r^
n
O
cr>
c_>
1-1
<
^
0
|
►j
M
w
8
H
K-l
H
w
g
3
9
H
0
CO
CO
W
2
M
u
0
fc
H
u
W
w
a)
tH
CO
<D
M
rl tH
rH
4-1
e •
i-l
M
0 4-1
w
0
0 0
W
*i>
01 p
•a w
u d
O
0
M
O
U
0
M 4J
O
ai
1 w
rH
cd co
W «
rH
M
•-3 CO «
<D
m 0
01
Vi
c 0
1
• O
1
01
. O fl
Q 0
r4 U
a
CO U H
CO
4-1
u
i
01
K
•H
d
1
01
^
td
0
3
a
4J
0
cd
-u
•H
rl
u
Pn
0
d
01
cd
1-1
rH
0
cd
9
4J
O
tH
4-1
o>
4-1
rl
4J
3
4J
•H
^
•rl
&
<4H
0)
g
>
CO
0)
cd
d
<4H
01
i-4
rH
•rl
u
•4-1
<
(0
t^
5"
4-1
4J
01
iH
rl
P-.
•H
T)
U
0
O
O
a)
w
10
CO
i
rl
3
CJ
01
4-1
x>
O
Xi
•H
.0
d
4-1
0.
4J
W
4J
cd
4->
O
3
a
u
4J
•d
J3
3
H
0
•H
O
a
fc
cd
01
a
TJ
0
00
•rl
cd
D.
CO
2
3
01
O
0)
rH
rH
9
•H
-*
H
0)
cd
XI
cr
rH
4J
0
u
01
W
0
4J
•H
J3
rl
JS
0
4-1
w
W
u
0)
Pi
4-1
a)
0
O
rl
00
cd
cd
0)
d
Cd
>
>%
Xi
^H
4-1
4->
cd
0>
0
•d
d
rH
r^»
0
01
0
T3
cd
a
O
rH
d
Ft<
<§
4-1
3
to
0
iH
d
•H
M
p-
9
3
0
M
Cd
01
X!
9
>-J
00
u
cd
S
4-1
H
Xt
■H
3
4-1
6
4J
M
•H
4J
Xi
0
u
3
4-1
X!
CO
a
O
01
rl
p-.
•d
co
3
d
01
•H
00
CO
<d
u
C
■H
tM
»
cd
9
TJ
d
d
CO
3
00
CO
a
4-1
M
3
0
u
u
rH
0
H
•->
tO
0
•H
4-1
to
tr
P-i
4-1
0
•rl
tH
4J
3
n)
4J
0)
n
w
4J
0)
4-1
cd
3
4J
T3
0)
01
5
u
X!
0)
O
01
CO
0)
TJ
01
•d
cq
id
9
01
O
CO
H
60
u
rl
4J
d
r-l
01
§
rl
d
d
u
rl
O
•H
4-1
01
Ft
0
cd
l-l
4J
0
0
4-1
4-1
CO
4-1
rO
a
0)
hJ
en
"3
01
•H
O
4J
O
CO
•H
w
O
d
J3
50
CO
3
•H
c
cd
U
4-1
•H
W
u
CO
3
0)
3
d
0 d
CO
•H
4-1
4J
0
td
M
60
01
l-l
cd
rl
e
CO
•H
4J
0
a)
J
Ol
01
M
O
4-1
4-1
•3
rl
d
01
d
4J
a
•d
01
« -H
0
01
4^
cd
•H
CO
O
01
•H
>
a
CO
•H
r-i
H
^<S
d «
0
E
u
VI
X>
> X
01
•3
-d
>-)
d
d
3
u
•H
u
0 cd
0
M
4-1
cd
1
•H
3
rH
3
d
1
0
cd
0
cr
cd
3
1
•H 4J
s
CO
Sd
CJ
CO
W
•->
P3
M
u
►J
0
w
U
P3
4-1 CO
I
o
o
e
u
o
01 -rl
o •
01
o.
o) U
X, o
XI
h
CO C
XI
o
41 01
X w
<
o
3 co
« 0)
CO lJ
IV 3
e u
o c
i s»
c
CO 4-1
r-i d
o. •**
03 O
J*! ->
■
c
c
S
o
o
at
-r4
c
1-1
M
4J
4J
0
6
u
O
00
a
i-4
01
(0
•4-1
01
>,
u
U
4J
1-1
IJ
4-1
4-1
4-1 4J
4-1
4J
co
41
CO
01)
01
C
o
;►.
u
a
u c
B
B
CL
a
>*
a.
0
a
f-H
3
01
3 Si
r-4
4J
01
01
T3
o
i-i
CO
o
1-1
^-i
r*
;s
-.
M
a
r4 8
r-l
u
e
rl
e
CO
m
01
i-i
I-I
u
x:
CD
4-1
a
4-i a
CO
3
a
01
a
01
X
i-(
T3
M
a
>->
i-i
1)
o
u
u
CO
i-i
00 i-l
4J
r4
fi
3
4-1 -rl
XI
a.
u
(0
a
01
01
b
3
3
4-1
c
3
B 3
CO
4-1
3
0
y 3
M
CD
u
V
<o
4-1
>
O
01
T)
o
cr
o cr
6
CO
cr
Oh
3 cr
01
l-i
O
x:
u
CO
c
•o
a.
•a
X
c
CJ
w
o w
r-l
C
u
r< U
£
00
01
u
00
>.
o
c
•
CO
o
•o
4-1
o
r-l
01
o
co
u
c
09
-o
4-1
_c
*»
H
• — 4
B
u
r-i
B
0) r-l
4-1
w
£
•u
o
§
CO
u
c
C
f-l
C r-l
O
r-4
CO
B ^
u
C
e
"O
4)
1-1
u
r-l
4-1
1-1
o
CO
O og
i-l
3
CO
O CO
c
CD
clj
— 1
(0
CO
3
u
01
o
0)
01
to
1-1
4-1
1-1 4-1
4-1
o
4J
B
U 4J
0
O
PK
01
u
a.
01
C
00
«J
u
as
se
co
4-1
00
U CO
CO
1-1
CO
O
00
rl
u
d
03
J=
01
r.
01
oo
CJ
CO
B
co B
4-1
4J
B
•rl
» B
1-1
01
-■
b
u
i-
l-i
>
01
— 1
i-i
•o
<M
U
4-1
M
4-1 M
0)
CO
M
4-1
rl M
a
0)
O
3
4-1
o
01
<
a
I-t
01
c
O
O
CO
00
XI
4J
CO
0)
-»-<
1-1
<4-i
H
0)
■M
s
o
r-l
-o
<0
O
X
X)
TJ
45 TJ
3
CO
•a
4-1
4J -O
u
IJ
01
r-l
<
s
u
3
B
3 B
CO
XI
B
(0
e b
u
CO
C
u
u
c
co
JS
u
00
01
GO
CO
co eg
3
0}
X
01 (0
<n
o
01
u
o
rl
■u
a.
£
0)
OS
0)
01
4-1
CO
3
o
41
01
— 1
a
to
-J
CO
>-■
09
•rl
oo
01
00
JS 00
OS
c
00
CO
00
a
C
en
S
09
u
O
u
CD
4-1
a
u
c
a b
o
S
r-l
B
rH C
i-i
U
3
01
U
u
CV
SO
u
4-1
1-1
I-I
1-4
01
o
1-1
•-• i-t
<->
B
CO
•-J
4-1
O t4
hJ
<U
CO
c
V
01
o
0)
4)
i-H
1-1
•a
X
e
•o
O TJ
a.
>
•o
B
rl -O
>
1-1
>
01
u
4J
u
41
i-l
CO
i-i
CO
r-l
t-l
T3 rH
i-i
CO
r-l
CO
4J f-4
c
"O
-J
B
M
05
c
u
>-
O
Q. -H
4-1
r-l
T*
B •*<
a
3
u
fl
rS
e -r<
o
B
0
4-1
4)
09
3
4-1
to
01
3
c
1-1
3
ca 3
«
cr
CO
3
r4
O 3
z
u
<a
<->
a
CO
3
(V.
CO
to
fa
as
CO
r-l
Cu
CQ
OS CO
CO
w
H
CQ
ca
CJ PQ
o
H
m
:<
c
<T3
^
OJ
•u
>-■
:••
o
9
a
r-<
V
aj
3
OJ
O
— i
c
en
m
0
~j
>
a
u.
TO
U
o
c
to
—J
^ V
o
00
u y
<>>«
■w
C i-»
(M
s
JO O
0) U
3
Cd •
O i-l
Ss B CO
« M C
B O
O « •*
JS • kl
gj o eg
X u z
M C
Si
o u
ki 3
00 U
a
C
3
CO
H
a
-o
00
cy
c
u
-J
<U
k.
B
1)
eg
<u
oo
c
i-i
•r4
CO
oo
1
c
d
>%
S
•a
eu
0
4)
01
3
CO
01
— i
1-1
4J
4J
ki
.*
co
1-1
CO
o o
eu
ki
U
05
o
•»
m
4-1
ss
— 1 kl
.cu
co
o
u
-4
ki
kl
eg
CO
CU
O CO
"O 00
u
3
c
X
H
V
eu
kl
eu
4J
1-4 kl
4J
O
en
u
— i
V
cu
r-i
eu
ki
e
4J
CO 41
CO
u S
C
en
01 ~a
eg
C
r»
l-i
00
O
cu
4-1
«
B U
eu -o
01 01
o
3 «
Pi
0
-*
4-1
s
Cu
k.
CO
ki
" 5
PL, _,
kl
•a ki
f-l
O 4J
CO
ki
09
SsQ
41
eg co
4J
0
On eg
"O
CO
CO
^
CO
c
►>
e
4J
CO SS
eg
z
rH
a
V
O
I4
eu
T*
CO
eg "O
CO
i-i co
u u
•o 0)
eg
i-H
Z
r-i
ff)
§
CO
ki c
B co
1-1
>
m c
T3
g«
o
V4
kl
T-K
e
X
ki
CO 3
O u
1-1
-^J 4J
J9 V
C
ki
fa
«M
•<
eg
o
o
CO
U
o
co eu
1-1
Q cj
9 a
eg
o -o
i-i
o
03
kl
■H
1-1
O
3
■ kl
.* 01
<
3
CO G.
ki e
eg
^
kl
H
4J
o
4J
a
kl CO
U ki
u
o a
•rl
«M
00 eg
a
V
c
eg
c
eg
fa
CU ki
eg 4J
X
4J
i-t a
e>*
u
41
1-1
0
1-t
kl
i-i
a
4J
•o
eu oi
—I co
0
•o
eg cr
V go
0i
r-4
1-1
a
eg
CU
41
o
•o
<U
§
ki -a
41
•O
s §
4J [i]
■o 01
0
kl
•
4J
>
<U
J
c
41
kl B
■ kl
4-1
B
h
0
su
m
kl
u
o
§
o
kl
<g
ki
o
CO S3
41 01
CO
CO
B O
O -l
z
CU
H
3
j
u
CO
3
4J
kl
k. J3
>1
CU ki
&, i-l
1-1
u
4-1
u
0
•o
CO
00
4-1 •>
O 4J
co
B
> 00
eg
•*
• 1-1
eg
— i
a>
u
x
X
kl
kl
o
kl
kl
.b £
B O
O
< ki
u u
z
01 -rJ
— 1
V
CU
CO
o
<u
S
1-1
CO
A
CU
oo oo
•-I
4-1
kl
01
CO CO
C U
o.
V
kl
S
<g
•o
eg
i-i
w
3
4-1
"O
-I 3
-1 TJ
u
r-i
J2 T3
01 C
i-l eg
V
u
XJ
O
o
01
X.
eg
eg
o
i-l
6
eg o
1-1 B
3
3
CO S
3 W
•-)
►J fa
oeS
CO
CO
o
u
OS
co
Cu-
>
X
i-l
3
33 cj
fa eg
Q
fa
g
DO
i-.
£
<X1
■^-t
0)
u
>*
0
a
to
■
u
c
CT
o
— <
Q
Cn
<n
o
c
ro
--4
M
0)
M
u
u
■r-l
c
— i
u
o
u
O
u
Oj
o
•
o
u
o
09
o
1-1
o
o
u
o
tj
u
c
iH
m3
u
(0
M
U
U
u
-*
c
09
c
(1
U
tj o
04
o
«o
01
o
C -I
i"l
w
1-4
4-1
3 4-1
•o
4J
01
W
O O
C
u
(2
E
1- 3
ID
3
*N
o
00 U
V)
01
01
u
u u
C
u
60
e
01 09
<o
00
h
o
TJ C
60
C
0
j=
o
^
5 u
0}
w
O
5
CO
e
J
o
a
•
M
o
„
O
e
01
c
09
•a o
1-4
gl-
o
o o
•
U 3
<-)
60 U
u u
u
01 09
aj
tj e
u
e
e
o
M
X
0)
c
z
o
1-1
60
c
4-1
CO
TJ
■
c
CO
CO
00
^S
C TJ
CO
14
>
60
u
CO
>-l
l-l
■0 g
u
TJ
TJ Ol
i-H 4J
e
u
o
TJ
41
o
Ol
01
B
CO 3
CO C
o
i-4
•
c
-J
c
s
3
• O
CO
01
3
CO
o e
4J fl
4J
B
f-l
09
1-1
o
o
3
U l-l
TJ
l-l
e
a
l-i Ol
U CO
0)
01
CO
CO
09
c
Du
TJ
01 00
OJ
4-1
41
w
C
co >
O Cu
0)
a
4J
3
01
0-
3
o
01
0)
01 14
e
co
>
4J
0
<
04
>
CO
CO
<44
u
O
TJ
u
09
U 01
CO
<
09
1-1
c
u
1-1
JN
5s
01
<
TJ
i-l
TJ
C
CO
CO
AJ TJ
— i
j=
>s
CO
O Oi
<0 O
u
d
CO
a:
C
14
c
3
<-H
c
CO C
<
4J
CO
CO
e
ca
*-■ T*
■0
CO
tj
(0
09
■9
O
01
J-l
9
CO
co
01
u O
01 M
&
4J
U
0*
c
>
1-.
Oi
■0
Ol
4-1
4-1
c •->
0) Ol
CO
3
»-«
CO
U
0)
00
Oi
C «
u
TJ
2
u
£
01
H U
01
u
■rJ
09
u
TJ
O U
C
C
3
S e
TJ US
co
a
i-i
0)
•3
CO
0)
O
01
c
4J 01
CO
CO
C
Q
01 CO
0)
«J
£
TJ
0)
a.
0)
*n
•a
CO
4J
>> 01
>1
<0
.*
60 CO
e
t4
0)
TJ
01
CO
u
01
l-l
£
01
CO l-i
S
Id
>
TJ
u
l-l
CO «
Oh
01
§
>
0
<
a:
O
c
09
0)
-4 «J
Ol
CQ
.c
§
CO
CO TJ
09
u
0*
04
<0
01
l-l
O co
u
4J
J=
l-l
r-l C
C 60MJ
u
O
c
a
CO
t4
4-1
09
vt
4J
O
H
C co
i-l C
o
CO
u
t4
a
0)
t4
0)
*
co
4J
CO
- >*
>>
C
l-l
3
l-i
u
01 -I
o
60
09
o
u
09
u
01
0>
•^
oi u
co
o
O
00
Ol
4J
CO TJ
a
09
U
CO
■-•
CO
CO
<0
l-l
e
3
r-l
e
3 3
•w
*
CO
u
c
|H V
O i-l
01
01
o
4-1
<*4
CI
i— •
f-l
CO
C
•-4
o
C JO
u
01
£
41
1-1
01 01
O —1
TJ
SsTJ
u
CO
u
u
a
o
01
Ol
o
•-i
Ol A
a
01
4-1
■a
TJ
■J
3 M
O 3
c
CO
c
o
4-1
3
O
01
u
u
>
CO
c
> «o
3
1-1
<x>
c
s
01 4J
33 to
CO
X
3
X
CO
co
X
Cd.
H
o
<
Itl
3
< <
a
s
-4
CO
s
to co
M
i-.
o
M
U
3
c
U
^
V
<u
h
>*
a
3
a
3
■
.— <
a
01
<c
o
-J
>
a
u,
8
M
M
M
c
•»J •
e
> y
e
at
- c
V
OS
&. M
ss
t— 1
o
in ■
0> 60
O
►1
4-1 —l
-i
u
U S3
u
s
c
4)
S3
e
o
s
S3 *
«
u
01
-4 O
> ■*
>
0- S3
< y
01
0
• S
00
89
3
u
C
r««
c u
C
a
o
tl
i
sj H
0)
E
t4
•a
co
■— I
>
H
4J
o c
tM
v -a
<
O
■u CD
i
^ a
u
3
o
On SJ
X.
01
t-
T3 4J
u
01
4J
C C
s
T3 e
0>
1-
S3
«N 01
e o
i-I
-
c
«n B
0-
63 -H
C
00
0
01
c
4J
0
u
J 8
0
>*
0> eg
tH
u
01
1-1
co
3 N
u
0>
4)
OS
0) Wi
Ul
C -I
u
01
3
oi a
o
a
01 — I
3
M
C
.*
k a
3
> 41
h
4J
01
u
4J l-<
Id
H
< e
•u
CO
>
S3
co
4J
Oh
c
05
<
Vi
(j
S9
Ed
C S3
c
-C
H
£ 01
C
U
S3 JZ
o
S3
-a
63 01
0
CJ
V U
o
•o
u
T3
TJ l-i
u
<
o ai
01
3
;n
c
3 4J
0)
O OS
OS
n
ro
S3
►1 CO
OS
*
OO.-s'
^ ON
CM vD CjN
ON i-»
• • in
>C CO H
O r-.
m vo
CO vO
on m
O^ .-I
co co
cm •-<
r» ■— i
00 R-S
^o o> en
O -"" f-?
O- vj
CO CM
r- to id
00 O 00
c-> O
en m
in <}■ in
• • in
•"-• <f
MD C*
in
H <f N
CM CM
r> cm
o
O in
co cv
MD
CM .-1
O B^
r-. in
en o
O CM MD
r-» on CO
IN 0> N
CO M0 <f
CM CO CM
CO CM
CO
crs
CO
sO
O
C-l
a^
o>
^o
r~
tyi
vO
CM
n
CM
CO
CM
i-t cm r-»
O CO vO
lO \D N
CO CM
l-l C O CM
MD HOC
6 o JQ
CM O
CO
U *-> 3
co m
t— <
a- < xi
m co
m
a. a;
r-l O 3
CD CD O.
PS >J <
in co
M3 M0
CO M0
H jj o o o
u
01
cd
co t-<
u
J£
u cu
cu
CD
co
o ex
K
,-J
►J
H <C
r-l
>
r-l
-LJ
T-(
■rl
o.
'J
w
eg
Q.
o
rc
2S
U
>^
>.
CD
CO
X!
XI
)-J
l-i
O
01
CL
D.
a
cu
o
0
■U
4-1
l-l
•r-l
0)
l-l
B]
W
cc
CO
CJ
x:
m >
cm i-i
CO rJ
cu
cu
>
01
a.
j-i
—J
o
O
I— 1
o
CD
CD
iw
X)
CJ
C
CU
CC
• r-i
Vj
CD
cc
o
X)
—i io 3 i— i
TABU-: 7
HETCH HETCHY POWER SYSTEM
ELECTRIC ENERGY GENERATED, PURCHASED, AND DISTRIBUTED
PLANT DATA
Moccasin Powerhouse
Dion R. Holm Powerhouse
Robert C. Kirkwood Powerhouse
Total
FISCAL YEAR 1977-78
Nameplate Rating
(Kilowatts)
90,000
135,000
67,500
292,500
ENERGY GENERATED AND PURCHASED (KILOWATT- HOURS)
Gross Generation
Moccasin Powerhouse
Dion R. Holm Powerhouse
Robert C. Kirkwood Powerhouse
Station Service
Capability
(Kilowatts)
104,000
150,000
85,000
339,000
Moccasin Powerhouse
Dion R. Holm Powerhouse
Robert C. Kirkwood Powerhouse
Net Generation
Supplementary Energy
"Bank" Withdrawal*
Purchase (PGandE)
Total
399,590,000
605,083,000
396,937,000
823,800
869,990
552,410
Annual Plant
Factor - °L
50.7
51.2
67.1
1,401,610,000
2,246,200
1,399,363,800
21,458,861
1,005,795,856
2,426,618,517
ENERGY DISTRIBUTED (KILOWATT-HOURS)
Sales
Municipal Accounts
Modesto Irrigation District
Turlock Irrigation District
Kaiser Cement and Gypsum Corp.
Kaiser Aluminum and Chemical Corp.
Norris Industries, Inc.
Lockheed Missiles and Space Co. Inc.
General Motors Corporation
IBM Corporation
Liquid Air, Inc.
Miscellaneous Customers
489,325
1,001,443
576,535
48,214
17,640
3,498
52,819
38,358
32,299
17,358
761
,403
,706
,724
,351
,000
,307
,023
,000
,200
,000
,100
Non-Revenue
Project Use
"Bank" Deposit*
Losses
Hetch Hetchy System
PGandE System (Municipal Accounts)
Total
2,841,847
69,477,933
46,659,346
29,386,577
2,426,618,517
In accordance with letter-agreement between City and PGandE dated 6/24/75
TABLE 8
HETCH HETCHY POWER SYSTEM
COMPARATIVE ELECTRIC ENERGY SALES TO CUSTOMERS
FISCAL YEARS 1976-77 AND 1977-78
(Nearest 100,000 Kilowatthours)
CUSTOMER
Municipal Accounts
International Airport
Municipal Railway
Public Works
Street Lighting
Unified School District
Water Department
Other City Departments
Modesto Irrigation District
Turlock Irrigation District
Kaiser Cement and Gypsum Corp.
Kaiser Aluminum and Chemical Corp,
Norris Industries, Inc.
Lockheed Missiles & Space Co., Inc.
General Motors Corporation
IBM Corporation
Liquid Air, Inc.
Miscellaneous Customers
TOTAL
1976-77
1977-78
195,200,000
191,800,000
62,300,000
66,900,000
26,000,000
26,100,000
46,000,000
45,700,000
39,100,000
41,300,000
44,900,000
30,800,000
86,300,000
86,700,000
1,013,500,000
1,001,500,000
592,000,000
576,500,000
0
48,200,000
0
17,600,000
2,100,000
3,500,000
0
52,800,000
0
38,400,000
0
32,300,000
0
17,400,000
800,000
800,000
2,108,200,000
2,278,300,000
TABLE 9
11ETCH HETCHY POWER SYSTEM
COMPARATIVE GROSS REVENUE RECEIVED FROM SALE OF ELECTRIC ENERGY
FISCAL YEARS 1976-77 AND 1977-78
(Nearest $1,000)
CUSTOMERS
Municipal Accounts
International Airport
Municipal Railway
Public Works
Street Lighting
Unified School District
Water Department
Other City Departments
Modesto Irrigation District
Turlock Irrigation District
Kaiser Cement and Gypsum Corp.
Kaiser Aluminum and Chemical Corp,
Norris Industries, Inc
Lockheed Missiles & Space Co. Inc,
General Motors Corporation
IBM Corporation
Liquid Air, Inc.
Miscellaneous Customers
TOTAL
1976-77
1977-78
$ 3,081,000
$ 5,377,000
781,000
1,068,000
359,000
460,000
559,000
747,000
612,000
783,000
509,000
636,000
1,126,000
1,503,000
20,982,000*
19,979,000*
12,484,000*
12,220,000*
124,000
1,908,000
35,000
689,000
32,000*
44,000*
134,000
1,979,000
37,000
1,446,000
60,000
1,211,000
17,000
624 ,.000
10,000
10,000
$40,942,000
$50,684^000
Indicates amount as paid by customer
• >
i i
' '
( )
r-<
.1.
f 1
e
u -
vO
m
■st
kC
I--
CM
rn
,,1
O-
vO
<JN
i i
0>
m
mL3
ci
r-l
• i'
kO
m
go
o i
...
in
m
On
•j-
t
i— (
m
CM
( •
o
-^
co^OvJ-r-ior^coOOOO
OOcMinOOCMOOOO
<tr^r~coOcOOOCMOr-i
inciin<toooo\ooovoOr-i
cm <!■ co r-i .j- cn .— i in o> m vo
cn^j-incMvo-vtoococMcoi^-
o
c
O
( )
CM
IS.
i
kO
kO
-t
in
CM
kO
Ol
vO
ON
-1
cn
CM
Ol
<t
m
l-l
CM
mvoc^oooooooocM
r- 1 r-» r~
co O in
oo in cr>
o
o
o
< )
in
m
m
CM
co
oo
o
c^
r- 1
CO
r— 1
h«
o^
rH
TN
in
CM
to
in
CM
<f
vO
in
O
^
CM
—J
eM
n
in
CM
<!•
CM
in
oo
kO
r-.
CO
«d
Ol
CNOcOO"kO<toOOOOOr-<
<fOoomo<|-inr^ooin
CMO00kOOr^<rr--\DCM00
cOvtr~i-ioi~~r-.f~-i-ir~.o
OOHini»\DNfHO <t CM
NHooncMi-tHoo^-inffi
omfflcoHNOooinN
Ok kO -<t t^ r-l COCMCMi-l
sf CO N
o
o
CO
oo
in
o
in
CO
CM
kO
CM
CM
OO
i-l
o
o
O
o
<o
cn
o
m
k£3
CM
r-~
h-
CM
«d
0"l
r— 1
o
O
o>
in
oo
r-.
<1
in
OO
kO
mooooinoof~-incM
o>oooomoooocMO
OOOOOvOr-^OOCO<tO
inoooor^mvtoor^<T>CTN
r^oocMoocna>or^.vd-coo
CMOOi— I lO i- I vO CO CTi O ■— i CO
■<t r- cm i-<
vd r-~ r-l
r»
o\
<f
in
<*
F-H
in
vD
r-l
CM
k£>
f-~
in
r-
r-<
r^
•-(
r-i
CM
O
n
o
O
o>
O
kO
CM
<t
OO
r-»
00
r-l
kO
oo
<t
oo
r»>
<r
00
kO
in
.—1
m
CO
'X'
r-l
cn
CO
p«.
1^1
r>
in
*—<
cn
o
o-
<r
-40
<t
o~>
<t
r-~ O O O O kO O
o\ O O O O i-t o
o
o
O
o
O
o
00
CM
CM
-.1-
o
O
CM
vO
co
coo
00
<N
CM
O
in
<*
cn
r-~
r-
co
m
m
i i i r~
CM P* CM kO rH CM OO
00 CO O in CO CM CO
<f r-» co t-i
kO 00
v£> o
CM O0
in
<t
in
St
oo
CO
<*
r-l
St
i— 1
CM
ON
oo
o
r-l
r^
.— I
O
CM
O
o
o
( 3
r~-
0>
CM
in
CO
vD
r-l
h»
CO
<t
<t
00
r-l
CM
cn
i—i
■st
in
o
in
kO
kO
cn i-i
oo o o o o o
O O O O O kO
On O O O vO P-.
0> k£>
<r
00
r-l
in
m r-i
aj
kO
CM
CM
CM 00
<f
cn
1/3
CI
CO CO H IT! r-l N
O in cm <J- co cm
in oo -J- i-t
\D
00
03
03
l-«
kO
r-i
in
O
oo
O
CJ3
3 CD O 4J
O S o O
.C O 5 4-t
hfni: ^
CU l-i D
O .-I ^
Pm O
K •
C U
SOPi
u
O
r-l
■H
•H
CO
^i
l-i
CJ
W
i-l
•H
CO
in
0)
|
B
o
rJ
•i-l
•H
3
CU
C
CU
O
n
01
J5
M
B
O- O
o
W
c
c
>>
JJ
iJ
o
o
o
til
03
03
CO
C
•H
•H
CU
01
3
l-J
3
-U
4-J
<3
E
•H
r-l
C
o
c_>
*
<
O
CO
CO
9
l-l
•rH
03
O
p:
4-1
H
o
M
M
4J
c
■U
CO
l-l
•H
M
CO
•H
O
o
•H
•H
a
•H
0]
03
O
4J
3
10
H
<
l-l
l-i
01
e
D
•rH
4-1
CO
O
0)
o
l-l
l-l
e
3
XI
3
o
Vh
l-l
0)
03
CL.
Z
-—1
M
M
OJ
rH
0
s
O
•rH
C
P
01
o
CO
c_)
<
M
XI
P-<
cO
0)
a
H
(X
O
J*
0)
r-l
rJ
r-l
3
4-1
S
•r-l
J-)
a
n
rJ
cn
01
crj
O
X)
rH
c
O
O
03
o
CU
CU
•rH
rC
rJ
O
•H
0)
0)
0)
J«!
P3
in
■r-l
CU
r-l
cn
in
u
3
Ol
D
o
>
•1—1
c
M
a)
C
XI
l-l
•H
•H
u
o
a
§
tr
CO
01
o
nj
CO
erf
3
g
3
CO
CO
o
o
CU
m
•rl
fl
pi
1-1
PQ
Ol
H
m
£
H
M
£
B
rJ
o
M
rJ
S
1
Ph
r
03
cn
00
n
0)
M
o
o
O
0
rJ
OE
TABLK 11
BUREAU OF LIGHT, HEAT AND POWER
COMPARISON OF BUDGETED AND ACTUAL EXPENSITURES AND RECEIPTS
(INCLUDING ENCUMBRANCES)
FISCAL YEAR 1977-78
DESCRIPTION
EXPENDITURES
110 Permanent Salaries
111 Overtime
112 Holiday Pay
200 Contractual Services
231 Lighting and Heating of Public
Buildings - General
231-1 Lighting and Heating of Public
Buildings - Special Fund
231-2 Lighting of Public Streets -
Pacific Gas and Electric Co.
231-3 Lighting of Public Streets -
Hetch Hetchy
231-4 Lighting of Public Streets -
Calif. Division of Highways
300 Materials and Supplies
400 Equipment
813 Auto Insurance
860 Retirement Allowance
862 Social Security
865 Health Service System
954 EDP - PUC Data Processing
TO TAL
RECEIPTS
Interfund Receipts*
Ad Valorem Taxes
TOTAL
BUDGET
$ 11,626.594
4,283,114
ACTUAL
-UNDER
+OVER
$
180,536
$
135,780 $
-44,756
652
314
-338
392
392
9
1,400
1,393
-7
4,141,118
3
,100,521
-1,040,597
10,086,232
10
,289,264
+203,032
868,950
729,520
-139,430
543,222
675,795
+132,573
23,398
29,238
+5,840
500
499
-1
9
9
9
222
222
9
34,976
25,798
-9,178
8,120
5,707
-2,413
7,375
6,397
-978
12,615
12,615
9
$
15,909,708
$ 15
,013,455 $
-896,253
$ 10,435,121 $ -1,191,473
4,578,334 +295,220
$ 15,909,708 $ 15,013,455 $ -896,253
WORK ORDER APPROPRIATIONS FROM ROAD FUND
DESCRIPTION TOTAL FUNDS EXPENDITURE
-UNDER
+OVER
Maintenance and Repair of
Street Lighting Installation
$ 275,000 $ 279,794
+4,794
* Transfers from other Departments.
TABLE 12
BUREAU OF LIGHT, HEAT AND POWER
EXPENDITURE FOR ELECTRICITY FOR MUNICIPAL PURPOSES
FISCAL YEAR 1977-1978
DEPARTMENT
Art Commission
Art Museum
Auditorium and Brooks Hall
Chi id Care Centers
City Demonstration Agency
City Planning
Do Young Museum
Disaster Corp.
Electricity
Farmer's Market
Fire
Ilassler Health Home
Health
Hetch Hetchy
Hidden Valley Ranch
International Airport (a)
Junior College District
Juvenile Hall
Lep,ion of Honor
Library
Log Cabin Ranch
Municipal Railway
Parking Authority
Police
Public Buildings
Public Works
Purchasing
Real Estate
Recreation and Park
Recreation and Park
Recreation and Park
Sheriff
Social Services
Street Lighting Operations (.003)
Unified School District
War Memorial
Water
TOTAL MUNICIPAL DEPARTMENTS
Academy of Sciences
State of California: Street Lighting
Traffic Devices
GRAND TOTAL FROM HETCH HETCHY
Candlestick Park
Yacht Harbor
NO. OF
CONSUMPTION
ACCOUNTS
KILLOWATT-HOUR
4
243,960
1
1,252,560
1
4,996,400
12
272,222
1
198,560
1
67,140
1
3,444,800
1
78
5
841,993
1
25,969
59
2,955,819
1
161,400
43
28,943,229
7
131,738
1
804,960
18
191,823,356
27
8,328,005
2
1,338,737
1
557,600
31
2,402,503
13
317,827
84
66,924,481
18
177,648
15
814,023
7
16,395,939
111
25,738,871
5
610,627
4
222,915
208
9,296,729
3
2,100,648
32
1,147,133
3
1,109,600
3
792,456
1
45,737,934
215
32,924,049
2
1,612,720
126
30,833,276
1,068
485,547,905
2
3,462,102
1
(b)
1
315,396
1,072
489,325,403
EXPENDITURES
5
215
21
205
86
,837
6
,111
4
070
1
419
55
,074
1
,351
13
,991
586
62
,332
3
,154
420
272
3
,067
14
,629
5,376
,613
138
146
21
,596
9
,848
46
,524
7
833
1,068
,011
4
050
17
,164
244
,459
450
295
10
629
6
903
187
844
111
184
25
394
17
792
13
800
724
795
644
,623
29
163
635
653
10,491
132
53
248
22
631
6
607
10,573,618
Motes: (a) Including 152,224,7.99 KWH resold at commercial rates for $3,942,491
to Airport tenants
(b) Included under Street Lighting Operations.
TABLE 13
BUREAU OF LIGHT, HEAT AND POWER
EXPENDITURE FOR GAS FOR MUNICIPAL PURPOSES
FISCAL YEAR 1977 - 1978
NATURAL GAS
DEPARTMENT
Art Commission
A'KlLtorium and Brooks Hall
Child Care Centers
City Demonstration Agency
City Planning
De Young Museum
Electricity
Farmer's Market
Fire
llassler Health Home
Health
lletch Hetchy
International Airport
Junior College District
Juvenile Hall
Legion of Honor
Library
Municipal Railway
Police
Public Buildings
Public Works
Purchasing
Roal Estate
Recreation and Park
Recreation and Park - Candlestick Park
Registrar of Voters
Sheriff
Social Services
Unified School District
War Memorial
Water
TOTAL MUNICIPAL DEPARTMENTS
NO. OF
1
ZONSUMPTION
ACCOUNTS
THERMS
EXPENDITURES
2
16,547
3,660
2
1,089
266
11
24,781
5,553
1
10,303
2,266
1
4,151
921
1
248,318
54,321
2
38,143
8,368
1
223
63
53
422,745
93,103
1
644
169
33
5
,548,117
1,244,734
2
1,221
295
6
1
,263,323
287,455
18
951,799
208,129
3
388,560
84,984
1
48,584
10,635
28
91,187
20,300
14
347,749
72,699
11
39,853
8,854
5
1
,215,595
277,025
15
240,004
57,079
3
34,958
7,686
1
299
101
104
1
,032,061
227,021
1
85,036
18,595
1
3,161
704
3
435,502
91,928
2
26,001
5,727
208
3
,456,263
758,689
3
208,163
45,561
10
115,948
25,492
549
16,
,300,378
3,622,383
STEAM __
(Doe* not include steam generated by City)
DEPARTMENT
llf.nl th (a)
NO. OF
ACCOUNTS
CONSUMPTION
THFRMS
184,600
EXPFNDTTURF
1 , 064
lot r s: (a) Ha Account
TABLE 14
BUREAU OF LIGHT, HEAT AND POWER
STREET LIGHTS IN SERVICE
JUNE 30, 1978
SIZE i. TYPE OF LAMP
HLflh Voltaic Scries Circuit
1,000-Lumen Incandescent
2,500 "
4,000 "
6,000 "
10,000 "
400-Watt Mercury Vapor
175 "
250 "
Low Voltage Multiple Circuit
1,000-Lumen Incandescent
2,500 " "
4,000
6,000
J 0,000
5,500 " Fluorescent
2 3,000
]00-Watt Mercury Vapor
175 "
250
400
700
J ,000
150-Watt Sodium Vapor
250 "
400 "
COMPANY
JOINTLY-
CITY-
OWNED
OWNED
OWNED
TOTAL
UNDERGROUND
CONNECTION
22
22
243
24
57
324
852
122
1,040
2,014
570
445
2,061
3,076
420
17
512
949
3
43
2 31
3
79
277
3
81
2
...
49
49
8
3
50
61
166
5
109
280
32
5
83
120
8
14
22
21
21
38
2
40
111
111
92
3,865
3,957
37
1,735
1,772
305
4,823
5,128
366
366
97
97
206
206
378
378
658
658
OVERHEAD CONNECTION
Uifth Voltage Series Circuit
2,500-Lumen Incandescent
4,000 " "
Li n .- Voltage Multiple Circuit
2,500-Lumen Incandescent
4,000
6,000
175-Watt Mercury Vapor
250
400 "
TOTAL, JUNE 30, 1978
TOTAL, JUNE 30, 1977
NET CHANGE DURING THE YEAR
1
11
2
58
8
14,678
1,914
807
20,255
54.0%
20,298
-43
1
...
...
11
—
49
2
107
8
14,682
4
1,914
807
686
16,603
37,544
1.8%
44.2%
100%
691
16,457
37,446
-5
146
98
TABLE 15
liUREAU OF LIGHT, HEAT AND POWER
EXPENDITURES FOR OPERATION AND MAINTENANCE OF STREET LIGHTING
FISCAL YEAR 1977 - 78
CONTRACTUAL SERVICE
P ■ G • & E . Company
Company-owned facilities (a)
Jointly owned facilities (a)
City-owned facilities (b)
Emergency service to City owned facilities
699,037
18,894
11,589
1 case-Lite Corporation
Croup lamp replacement - City -owned facilities
I ,e ase Lite Corporation
Maintenance and repair - City-owned facilities
Routine maintenance
Repair of damage caused by accidents (c)
Repair of damage caused by equipment failure
Repair of damage caused by vandals
MATERIAL AND SUPPLIES (FURNISHED BY CITY)
Damage caused by accidents (c)
Damage caused by equipment failure
Damage caused by vandals
ELECTRIC ENERGY (HETCH HETCHY)
36,460,727 KWH at $0.04116/KWH less 60.47. discount
9,277,207 KWH at $0.04724/KWH less 64.97. discount
TOTAL EXPENDITURE
44,881
58,309
46,290
2,600
44,113
11,882
2,097
LESS AMOUNT PAID TO HETCH HETCHY FROM:
Gas Tax Funds for State Highway Routes
Kocreation and Park Department for off-street lighting
22,631
2,796-
TOTAL NET EXPENDITURE
AVERAGE OPERATING COST
Based on number of lights in service June 30, 1978, average total
cost of operation, maintenance and repair per light per year:
46.36
(a) Includes maintenance, repair, fixed charges and
electric energy for Company-owned facilities.
(b) Includes replacement of individual lamp and broken
glassware, service and switching charges, and electric
energy.
(c) When responsible party is known, claim is filed for
recovery of cost.
TABLE_16
BUREAU OF .LIGHT , HEAT AND POWER
NEW CITY-OWNEd'sTREETLIGHTING INSTALLATIONS
COMPLETED DURING FISCAL YEAR 1977-78
Loin Lions
Financed by Bond Issues:
Crossover Dr. and Park Presidio Bypass 96
Army 2nd 24th St. 137
Kezar Drive 44
Alemany Blvd .-Mission St. to San Jose 98
Irving St. -7th to 22nd Ave. 48
I.aguna Honda and Woodside Area 53
Lakeside Area 61
Type of
Light s*
SV
MV
MV
SV
MV
MV
MV
Value
232,648
92,200
57,128
237,692
96,524
50,100
135,500
Total
537
901,792
Financed by State Gasoline Tax:
Turk - Van Ness Ave. to Gough St.
MV
11,793
Grand Total
543
913,585
v>iv - Mercury Vapor
SV - Sodium Vapor (High Pressure)
U i
-1
o
-1
co
CI
rH
SI
st
oo
VO
o
st
00
I--
CM
vO
m
CM
el
in
r-l
CI
co
o
00
CM
o
St
vO
10
00
CM
in
r-.
st
e '
00
i-i
o
t i
m
en
VO
en
sf
- 1
IT!
st
rH
vo
00
r ■>
O
en
en
-r
00
o.
1-^
00
00
en
CO
o
C 1
-T
-J
H
c
C»J
00
rH
m
i-l
at.
c 1
00
r-l
o
m
en
o
SJ
en
SO
o
rH
00
en
in
rH
av
on
st
o
en
o
m
r-l
O
O
CM
VO
O
o
.-1
in
en
rH
m
St
en
o
in
O
CM
st
st
C 1
St
CO
H
IT)
c 1
rl
cj
vO
m
rH
r-l
CM
rH
H
</>
0
K
<U
to
H OM1
O CO
oo co m
st
c:
(U
m co st
vO o
CO OO vO
o>
(0
a
\d cm in
co o
m o oo
Ox
CTv 00
vo a\
>>
01
i.1
■iJ
':;
u
rd
-C
p
4-J
on
0)
V)
•H
a
O st 00 rH CM vO CM
in r^ I-. CO <f tM <f
vO CM in rH rH VO CM
CM CM VO <3> St O
CM rH .-H t-\
O r-
O ^
o a
I I I I I
mcostvoavi-lstvOvoovDm
ov<toomcrvcor^cor-.oinr-~
•jr><tNHNcoNnr^iriCA
CO N M» O
I I I I I I I I I I I
on
4-1
c
OJ
•H
CO
QJ
iJ
■■■)
M
.e
C
J-l
bU
0
n
•H
PQ
kJ
I I I I I
I I I I I I
Ov CM rH CM O CM rH
OvH <f N O <f H
co n om^ o <f o
CM 00 i-H vO rH O O
CM CO CO rH vO in rH
m rH co vo cm m oo
st m oo m m
.H rH CM St 00
co H ov O in
CM i-H CO rH Ov
1
oo
vO
r-
r^
1
eji
r^
rH
r~-
01
a
co
H
ai
H
X
0
m
co
H
cd
a
m
rH
rH
rH
co
rH
CO
o
CI
vO
rH
lO
CM
St
0>
vO
en
VO
CM
H
st
o
en
rH
rH
CO
CM
CO
00
o
rH
vO
St
00
en
vO
sr
vO
rH
0>
st
0>
CM
CM
m
ro
vO
rH
CO
o
st
CO
in
St
rH
VO
St
vO
CO
rH
CO
O
00
co
CO
co
CO
Ov
m
CO
vO
H
VO
CM
CM
O
en
oo
st
vC
CM
VO
rH
rH
O
c
rH
CI
CO
o
o
CI
SI
CO
O
St
CO
en
sf
rH
iH
rH
m
rH
st
CO
Ov
m
CO
o
st
rH
St
in
rH
m
VO
vO
CM
Ov
CJ
St
co
CO
CJ
rH
rH
vC
in
w cd
•H U
hh co
in rH 1-^ St CO rH
r^ m cm o vo o
vo rH r-» r^ rH in
oo cm m in <• cm
-T st m H H
1^- rH rH rH
I I I I 1 I I I I I I I I I I I I I
CO CO
m m
av av
invor~--oocr>OrHcMcosrmvor-^oocriOrHcMco<tinvor-~co
inininminvovovovovovovovovovor~~'i^-r^r>.r^-r-^r^.r^r^
I I I l I I I I I I l I I I I I I I I I I I I I
srmvor--ooovOrHcMcostinvor^ooovOrHcMcostinvor^
inininmininvovDvovovovovovovovor^r^r^r^r — i — ^r^-r^
CT*OvC>^CnOvOvCr*CT\0>OvCTvO^O>OVC7ACT*CyvCTvOVCr>0^
rHrHiHi-HrH-HiHrHrHrHrHrHrHrHrHrHrHrHrHrHrHrHrHi-H
•H rH
PM I")
If)
CO
c;
0
o
u
u
rH
cd