LIBRARY
OF T^JE
UNIVERSITY OF CALIFORNIA.
TABLES
FOB
u (J
OF THE
PROVIDENCE PATTERN," ETC.
BY
EDMUND B. WESTOX,
M. A.M. SOC. C. E ; M. INST. C. E.; ENGINEER IN CHARGE OF WATER DEPARTMENT, CITY ENGINEERS
OFFICE, PROVIDENCE, R. I.
SECOND EDITION.
REHRINTED FROM ENGINEERING NEWS, JUNE 21 AND 28, 1890.
NEW YORK:
ENGINEERING NEWS PUBLISHING CO.,
1896.
TABLES
FOR
THE "V
UNIVERSITY
IDENCE PATTERN," ETC.
BY
EDMUND B. WESTON,
M. AM. 80C. C. E.J ASSOC. M. INST. C. E.: ENGINEER IN CHARGE OF WATER DEPARTMENT,
CITY ENGINEER'S OFFICE, PROVIDENCE, R. I.
MISCELLANEOUS DATA RELATING TO LAYING WATER PIPE, ETC., NOT IN-
CLUDING THE COST OF THE PlPE.
Ordinary labor was considered at $1.50 per day.
Short lengths. — Total cost of laying 6-in. pipe per lin. ft. from 15 to 50
ft., including excavating and back-filling for the same; in easy digging, $0.34;
in medium digging, $0.45.
Extra Excavation. — In easy digging, $0.20 percu. yd.
Rock. — Average cost of blasting rock per cu. yd., $2.00
Maximum " •' " " " 3.00
Bridges. — Cost of crossing bridges, laying pipe, boxing, etc., 12 in., $1.50
per. lin. ft.; cost of crossing bridges, laying pipe, boxing, etc. , Sin. $1.32
per lin. ft.
Kail roads. — Cost per lin. ft. of laying 374 ft. of 16-in. pipe that passed
under two railroad tracks $0.50.
Work of one man. — The average proportion of work that an ordinary
laborer will perform in one day, at excavating, refilling and laying pipe (not
including calking, etc.), is as follows:
inch
In easy digging 21 lineal feet of 6
" medium '
17.2
M
* •*
" hard
10.3
««
« ,t
" easy
" medium '
19.3
13.4
«
• 8
' 12
" easy
" medium '
9.0
4.4
7,
' 20
' 24
Average cost of excavation for a 24-io. pipe.— The average
cost of excavating and back-filling in medium digging, for a line of 21-in.
pipe 19,416 ft. long (the average depth of the trench being 6.60 ft. in depth),
with ordinary labor at $1.50 per day, was $0.32 per cu. yd.
TABLE NO. 1.
WEIGHT OF WATER PIPES, OF THE "PROVIDENCE PATTERN.1
Length, 12ft. over all.
Nominal
diameter
in ins.
Class.
Fhick-
ness of
shell in
ins.
Length
that pipe (
will lay.
Depth
>f bell
in ins.
Weight in pounds .
Standard
veight in '
Ibs.
Greatest
jro posed
head
in ft.
ser run-' i
ning ft.
>er run- ^
ning ft.
as laid.
of shell.
/ ti
13-32
11.83
2.00
19.61
18.11 232
60
j
7-i6
•
20.88
19.37 247
100
b'
7-16
"
20.88
19.37 247
140
4 <
1532
»»
«
22.06
20.61 261
180
1
£
15-32
•<
'
22.06
20.61 281
220
^
D
15-32
"
4
22.06
2061 261
260
ft
7 16
11.83
2.00
30.25
28.25 i 358
60
f
15-32
32.11
30.12 380
100
i
t
"
• '
33.98
31.99
402
140
b •<
B
17-32
,,
44
33.98
35.75
31.99
33.81
402
423
180
220
I
D
l,-32
'•
44
35.75
33.81
423
2dO
ft
15-32
11.82
2.15
42.64
39.93
504
60
J
45.09
42.43
533
100
^
17-32
••
»>
47.63
44.92
563
140
8 -<
TJ
9 18
t.
.«
49.92
47.39
590
180
^,
19 32
»»
<•
52.53
49.84
621
220
1
£>
1332
"
44
52.53 49.84
621
260
/ ft
y
11.81
2 27
56.13
52.58
663
60
i 5
17-32
59.27
55.70
700
100
1 b
9 16
«.
«»
62.31
58.80
736
140
10 •< «
. W-62
(•
4»
65.37
61.89
» 772
180
i
(/
<>
"
68.50
61.95
809
220
D
2132
•«
'4
71.54
68.00
845
260
/ ft
17-32
11.83
2.40
71.19
66.81
840
60
(
A
9-16
"
75.00
70.57
885
100
»<
««
82.37
78.02
972
140
12
12
21-3:'
«*
83.10
81.72
1,016
180
1
c
11-16
it
89 75
85.40
1,059
220
I,
D
"
93.47
89.06
1,103
230
a
19-32
11.78
2.70
105.31
93.77
1.240
60
A
21-3^
115.28
108.76
1,358
10)
11-16
a
'<•
120.34
113.73
1,417 140
16 •<
B
M
• '
«•
130.14
123.61
1,533 180
C
13 16
0
..
139.96
133.41
1.648 220
!
D
27-3J
44
"
114.88
138.28
1,706 260
'
ft
2132
11.75
2.95
145.14
135. 80
1,706 60
f
A
2332
157.62
148.29
1,852 100
b
25-32
•
169.98
160.70
1,998 140
20 •<
B
27-32 '4
•
182.38
173.05
2,143 180
I
"
'
194.99
185.30
2,292 220
v
D 31-32
44
4 I 207.24
197.49
2,436 280
a 2332
11.73
3.20
190.83
177.91
2,239 60
f
A
13.18
213.30
2J0.36
2.502
100
I
b
"
• '
228.16
215.24
2,677
140
24 •<
B
151ri
»'
«»
242.97
230.03
2,850
180
i
C \ 1 1-32
"
"
266.UO
252.09
3,121
220
I
D
1 3-32
44
44
280.66
268.70
3,233
260
a
13-16
11.70
3.63
269.66
250.33
3,155
60
A
29-32
297.78
278.38
3,484
100
1
1
«
• <
325.56
306.i'5
3,809
140
30 1
B
1 1-16
ii
"
344.10
324.74
4,026
180
1
C
1 3-16
*»
"
382.56
361.48
4,476
220
v
D
1 9-32
•«
11
409.91
388.83
4,798
260
ft
y
11.67
4.00
351.41
323.93
4,101
60
1
A
1
396.49
368.98
4,627
100
1U
»4
«*
441.13
413.7^
5,148
140
36 -(
B
18
*»
"
485.60
458.15
5,687
180
1
C
1 11-32
"
• '
522.07
491.27
6,091
220
I
D
1 15-32
"
14
566.04
535.17
6,604
260
ft
1 5 32
11.54
5;50
632.06
569.93
7,295
60
i
A
1 5 16
707.09
644.91
8.161
100
b
1 15-32
»>
«'
781.60
719.42
9,0-21
140
48 •<
B
"
'«
855.68
793.49
9,876
180
C
1 25-32
• «
"
939.20
867.00
10,840
220
D
1 15-16
"
1.012.33
940.10
11,684 260
The thickness of the cast-iron pipes given in this table were calculated by
the following formulas:
For diameters greater than 36 ins., t = .00003 II D + .0125 D + .33; for di-
ameters of 36 ins. and less, t =.03003 H D + .01 D + .30; t = thickness in decimals
of an inch; D = diameter in inches; H = head in feet.
TABLE No. 2.
ESTIMATED AVERAGE CO IT PER LINEAL FOOT OF LAYING CLASSES A AND B, OF
CAST-IRON WATER PIPE OF THE "PROVIDENCE PATTERN," AND EXCAVATING
AND BACK-FILLING FOR THE SAME, IN MEDIUM DIGGING, WHEN THE MARKET VALUE
OF THE PIPE, IS AT DIFFERENT RATE3 PER TON. GATES AND " SPECIALS " ARE
INCLUDED, BUT NOT HYDRANTS.
Cost per
Ton,
and.
DIAMETER
OF PIPE IN INCHES.
Cost per
Ton,
and
Class.
4
6
8
10 12
18
20
24
30
36
48
Class.
A. ..
0.425
0.610
0.783 1.008 1.245
1.8)9
2.604
3.502
4.919
6.360' 11.0071 ..A.
_
$2d^
B. .
0.410
0.635
0.848 1.079 1.377
2.076 2.902 3.855
5.500
7.396 12.735, . B.
$Jo
of / A. . .
0.437 0 627
0.812 1.038 1.283
1.957
2.684 3 608
5.096
6.547
11.341 ..A.
26 \
B. ..
0.452 0.653
0.873 1.112 .420
2.142
2.993
3.975
5.670
7.625
13.138
..B.
'•O
'A.
0 448 0.614
0.835 1.068 .320
2.015
2.763
3.714
5.243
6.734
11.675
..A.
01
27 IB:::
0.163 0.671
0.898 1.145 .463
2.207
3.085
4.095| 5.839
7.854
13.541
. B.
27
'A.
0 459 0.631
0.853 1.098 .353
2.074
2.843
3.819 5.391
6.921
12.009
..A.
OP
28 j
B*
0.475 0.689
0.923, 1.178 .506
2.272
3.176
4.245 6.009
8.082 13.944
..B.
to
A.
0.470i 0.673
0.88) 1.128 .396
2.132
2.923
3.925J 5.538
7.HJ9 12.343
..A.
.1(1
29-
j}'
0.436 0.707
0.918
1.211 .550
2.338
3.268
4.334 6.178
8.311
14.347
..B.
JQf
A. ::
0 481
0.535
0.905
1.153 .434
2.190
3.002
4.030
5.686
7 296
12.677
. A.
Oft
30
B.
0.493
0.725-
0 973
1.214 -593
2.403
3 359
4.454
6.348
8.540
14.750
. B.
30
A. ..
0.492
0.742
0.926
1.188 .472
2.248
3.082
4.136
5.833
7 483
13.011
..A.
31
B. ..
0.513 0.743
0.938
1.276 .653
2.468
3.451
4.574
6.517
8.768
15.154
..B.
31
A...
0.5331 0.729
0.943
1.213 .510
2.307
3.162
4 241
5.980
7.671 13.345
..A.
oo
32
B. ..
0.521 0.761
1.023
1.309 .679
2.534
3.542
4.693
6.686
8.997 15.557
..B.
61
A...
0.514
0.748
0.971
1.243 .548
2.365
3 2tl
4.347
6.128
7 858 13.679
.A.
oo
33
B. ..
0.535
0.779
4.043
1.1342' .722
2.599
3.634
4.813
6.856
9.226 15.S60
. B.
66
A. ..
0.525
0.762
0.934
1.273 .536
2.423
3.321
4 453 6.275
8.045 14.013
.A.
'.» i
31^
0.544
0.797
1 073
1.375 765
2 664
3 726
4.933 7.025
9.454 I«.c63
..B.
o4
A. : .
0.553
0.77)
1.017
1.308 .621
2.481
3 400
4.558
6 423
8 232! 14.347
O"
35
B. ..
0.538
0 815
1.093
1.408 .809
2.730
3.817
5.052
7.1 5
9.683 16 766
'.'.B!
OJ
op
A.
0.547
0.793
1.039 1.338! .662
2.540
3.480
4 664
6.570
8.4*0 14.681
. A.
Of!
36
B. ..
0.5)3
0 835
1.124; 1.440 .852
2.795
3.909
5.172
7 364
9.9,-2 17.169
..B.
BO
OT
A. ..
0.553
0.813
1.032
1.383 .699
2 598
3.560
4.769
6 717
8.607
15 015
.A.
O>7
37
B. .
0.579
0.851
1.14.)
1.473 895
2.860
4.000
5.292
7.534
10.141
17.572
B.
61
A. ..
0.570 0.83)
1.085
1.3)81 .737 2.653
3.639
4.875
6-865
8 794
15.349
..A.
no
o3
B. ..
0.591
0 8ii)
1.1711 1.503
.933
2.926
4.092
5 412
7.703
10.369
17.S75 ..B.
OO
A...
0.581
0.847
1 133 1.427
.775
2 714
3.719
4.981
7.012
8.981 15.083
A.
on
o3
B. ..
0.602
0.857
1.199
1.533
1.931
2.991
4.183
5.53L
7.873
10.5981 18.o79
..B.
3v
A...
1.582
0.861
1.13)
1.457
1.813J 2.773
3.798
5.086
7 160
9.169 16.017
..A.
40
4J
B. ..
0.644
0.935
1.224
1.572
2.025
3.056
4.275
5.651
8.042
10.8271 18.782
..B.
4U
11
A...
0.605
0.831
1.155
1.487
1.851
2.831
3.878
5.192
7.307
9.3561 16.351
..A.
41
41
1 B.
0.625
0.923
1.249
1.605
2.068
3.122
4.366
5 771
8.211
11.055 19.185
..B.
4 L
19 J
fA...
0.614
0 893
4.173
1.547
1.839
2.839
3.958
5.297
7.454
9.543 16 685
..A.
19
42
B. ..
0.657
0.941
1.271
1.637
2.111
3.187
.458
5.890 8.1:81
11.284
19 588
..B.
4-
10 ( A. . .
0.62.
0.915! 1.193
1.547
1.927
2.947
.037
5403 7. '02
9.731
17 (19
..A.
._
43
L B. . .
0.649
0 959
1.293
1.670
2.14
3.252
.549
6.010 8.550
11 513
19.S91
..B.
4o
, t
A. .
0.636
0.932
1.965
3.003
.117
5.503J 7.749
9.918
17.353
. A.
11
44
B,
0.630! 0.977
024
l'.7d3
2.197
3.318
.641
6.130 8.72011.741
20.S94
..B.
44
0.647
0.949
1.244
1.637
2.003
3.064
.137
5.614 7.896
10.105
17.687
..A.
A £
45
B*
0.872
0.995
1.349
1.733
2.241
3.383
.732
6 249
8.88911-870
20 797
. B.
40
j/»
f A'. ' :
0.658
0.933
1 237
1.657
2.010
3 122
4.276
5 720
8 044
10 292
18 021
..A.
46
IB.
0 684| 1.013
1.374
1.769
2.234
3 448
4.824
6 369 9 059
12 199
'/1. 2(10
..B.
46
A.
0.639 0.983
1.637
2.078
3 180
4.356
5 82* 8 191
10 480
18 355
..A
Art
47
IB. ..
0.695
1.031
1 393
1.8)2
2.327
3 514
4.915
6 489 9.228 12 428
21 604
..B.
4/
gm
A. ..
0.63) 1.0 0
1.312
1.697
2 116
3. 39
4 435
5 931 8 339
10 667
I860, A.
48
48
B.
0.707
1 0'<9
1.424
1.834
2.370
3.579
5 007
(> 609 9.398
12 656
22 007
..B.
4o
A...
0 691 1.017
1 1.335
1.727
2.154
3.297
4.515
6 036 i 8 486
10 854
19 024
4Q
49
B. .
0 718! 1 057
1.449
1.867
2.413
3.644
5 0)8
6 7281 9 567
12.885
22 410 ..B.
±v
dri
A...
0 702 1.034
1 358 1.757
2.192
3.355
4 595
6 142! 8 65311 041
19 358 . A.
CA
OU
B. ..
0.730
1.085
1.475 1.90J
2 456
3 710
5 DC
G 843 9 737
13 114
22 813
. B.
on
The thickness of the Class A pipe was based upon a static pressure of
10(> ft., and the Class B pipe upon a static pressure of 180 ft.
The figures include the cost of pipe, gates an I " specials," the cost of cart-
ing, laying and setting, and excavating and back-filling for the same, and all
other expenses generally incurred in ordinary water pipe laying, with the
exception of the cost of hydrants.
The cost of "specials" was based upon $0.025 per pound, with pipe at
$30 per ton, the cost of air-cocks (used only with pipes having a diameter
larger than 20 in.), at $10 each, and the cost of the gates the same as given in
Table No. 3.
Ordinary labor was considered at $1.50 per day.
Depth of Pipe.— The depth of the axis of the pipe below the surf ace of
the ground has been considered in all cases as 4.67 ft.
I!
s 15 a s &
32 8
22 S3
B SZ S
1 8
8 S.
gs s s 3
g3j « o ^
- -
a s s s- s
I 1 1 1
^-o^is I *j 2 S S 22 S
I i
S 2
£ S
S S
o
= ! §
o i u -SH
5 s
I H
11
8 .* . -
S S § S
i-l QC O
« - |
XX^-;X^^rfo(=<=(=eSOOC5C;300000f-l— I'-K-'rH^Hr-KMNCO
i; * O I
,c^
a-MdMd;N|:E;:S;:a;:S;:a;:S;
ST-J J-2irt hl»-«T3 :»,"TTJ t^-TT: ^S'O ^^^ t^S^ ^ST3. >>S'?.
§ lg
^ 03 '3
O j£,
M «-
i if
'•as s
> p
••c 2
45 fc*^
P eS-C
'El
OB 5
ill
*-> *S ^
P &JLOD
^ ^ p, g a
§1! 12
R^ P flj ^-02
•"•^ as JB
O «D «D
£t
P4
O
x ee-
I !
-M O
S 'i
ZrS'O S-*3 S -^
o^^.88*5-
^
TABLE NO. 4.
WEIGHT AND COST OF SPECIAL CASTINGS, ETC.
To be used in connection with Table No 3 when greater accuracy with regard to
•" specials " is required.
Nature of
" special"
Xin inches).
Length that
" special"
will lay.
Weight
in
pounds.
Cost at
$ .03 per
pound.
Nature of
"special"
;(in inches).
Length that
"special"
will lay.
Weight
in
pounds.
Cost at
$.03 per
pound.
Branches.
Feet.
$
Reducers.
Feet.
$
6X 4
6X6
6 X 6 X 6
6X8
6 X 6 X 8
8 X 4
8X6
3 x e
8X8X8
8X8X6
8X6X6
10 X 6
10 X 6 X 6
10 X 8 X 6
10 X 8
10 X 8 X 8
12 X 6
12 X 6 X 6
12 X 8 X 6
12 X 8
12 X 8 X 8
12 X 10
12 X 12
16 X 6
16 X 6 X G
16 X 8 X 6
16 X 8
16 X 8 X 8
16 X 10
16 X 12
16 X 12 X 12
16 X 16
20 X 6
20 X 6 X 6
20 X 8
20 X 8 X 6
20 y 10
.20 X 10 X 8
20 X 12
20 X 16
24 X 6
24 X 6 X 6
24 X 8
24 X 8 X 8
24 X 10
24 X 12
24 X 16
24 X24
30 X 6
SOX 8
30X 8 X 6
-30 X 8 X 8
30 x 10
30 X 12
30 X 12 X 8
30 X 16
30 X 20
30X24
30 X 24 X 12
30X30
Blow offs..
3.22
3.22
3 22
3.22
3 22
3.20
3.20
3.o6
3 20
3.20
3.20
3 36
3.36
3.36
3.36
3.36
3.22
3.22
3.22
3.^2
3.22
3.39
3.22
3.03
3.03
3.03
3.20
3.20
3.20
3.20
3.20
3.20
'. .84
.84
.84
.84
.84
.84
.84
.84
.53
.53
.53
.53
.53
' .53
.53
.53
5.04
5.04
5.04
5.04
5.04
5.04
5.04
5.04
5.04
5.04
5.04
5.04
190
190
235
218
265
239
243
287
362
315
234
353
360
426
356
446
394
469
581
428
481
535
453
5»8
660
661
641
733
638
627
800
84o
1123
1202
1183 •
1190
1112
1250
1233
1383
1082
1453
1345
1540
1463
1408
1537
1656
1955
1980
2150
2145
2078
2048
2210
2290
2288
2560
2695
2478
5.70
5.70
7.05
6.54
7.95
7 17
7.29
8.61
10.86
9.45
8.52
10.59
10.80
12.78
10.68
13.38
11.82
14.07
17.43
12.84
14.43
16.05
13.59
17.64
19.80
19.83
19.23
21.99
19 14
18.31
24.00
23.35
33.69
36.06
35.49
35.70
33.36
37.50
36.99
41.49
32.46
43.59
40.35
46.20
43.89
42.24
46.11
49.68
53.65
59.40
64.50
64.35
62.34
61.44
66 30
68.70
68.64
71.80
80 85
74.34
6 to 4
8 to 6
10 to 8
12 to 8
16 to 12
20 to 16
24 to 12
30 to 24
Turns.
4—1-16
4-*6
Sie
6— y*
8-1-16
8-K
8-V4
10-1-16
io-4$
12- K
Bevel hubs
6
8
10
12
Spig't caps
6
8
10
12
16
Bell caps.
6
8
10
12
16
20
24
30
Plugs.
6
8
12
Sleeves.
4
6
8
10
12
16
20
24
30
36
Gate boxes
Large '
" rings.
' cov'rs
Small box
(6")
' cover
(6 ')
" box
(8")
1 cover
(8")
1 63
1.95
1.65
2.61
2.70
4.17
4.59
3.04
1.55
1.33
1.89
1.58
1.42
1.38
3.57
3 32
2.25
3.48
3.23
3.22
1 75
1.74
3.94
1.72
65
105
148
205
338
863
923
1158
48
47
61
90
92
109
233
239
136
291
296
443
90
130
316
219
39
57
78
110
155
41
63
78
118
160
220
342
548
10
15
27
67
38
56
80
107
131
207
319
457
637
907
689
142
83
137
19
160
38
1 95
3.15
4 44
6.15
10.14
25.89
27.69
34.74
1.44
1.41
1.83
2.70
2.76
3.27
6.99
7.17
4.08
8.73
8.88
13.28
2.78
3.90
9.48
6.57
1.17
1.71
2.34
3.36
4.65
1.23
1.89
2.34
3.54
4.b0
6.60
10.26
16.44
.30
.45
.81
2.01
1.14
1.68
2.40
3.21
3.93
6.21
9.57
13. 7 J
19.11
27.21
20.67
4.26
2 49
4.11
.57
4.80
1.14
24 X 6
30 X 8
Manholes.. . .
4.53
5.04
1377
2055
41.31
61.65
21
30
36
Hydrant
4.53
5.04
4.00
1625
2020
2015
1010
491
102
48.75
60.60
60.45
Hydrant box
Frame and
cover
14.73
3.06
TABLE NO. 5.
COST IN DETAIL OF LAYING WATER PIPE OF THE "PROVIDENCE PATTERN/' INCLUDING
EXCAVATING AND BACK-FILLING FOR THE SAME.
Excavation (Easy Digging).
Items.
Diameter in inches.
Average
prices of
labor, etc.
4
G
8
10
.0707
.0219
.0216
.0 69
.0111
.0553
.0136
.0275
12
13
20
24
1 Trenching
2 Laying
3 Foreman
4 Tools, etc., etc
5 Calking
6 Lead
7 Teams . . ...
.0422
.0129
.0130
.0041
.0106
.0224
.0070
.0078
.0518
.0162
.0158
.0050
.0107
.0320
.0090
.0149
.0611
.0191
.0188
.0059
.0108
.0431
.0115
.0208
.0798
.0249
.0244
.0078
.0118
.0683
.0160
.0346
.2676
.1445
.0370
.0303
.0134
.0159
.0950
.0203
.0518
.4082
.2088
.0497
.0360
.0191
.0301
.1203
.0216
.0746
$1.50
1.50
3.00
1.1% of 1 » nd 2.
$2.25
5c. per pound.
$2.25
$1 per ton.
8 Carting
Total .
.1200
.1554
.1911
.2286
.5602
Cost of Easy Digging reduced to $1 and Ic.
Trenching
0281
.0345
.0407
.047l!
.0532!
.09631
.1392 ...
$1.00
Laying
.0086
.0108
.0127
.01461
.0166
.0^47 !
.0331
1.00
Foreman
.0043
.0053
.0063
.00721
.0081
.0101
.0120
1.00
Tools, etc., etc
.0006
0007
.0008
.OOU9
.0011
.0018
.0026J
w
Calking .
.0047
0047
.0048
0049
.0052
.0071
01341
$1.00
Lead
0045
0064
0086
0111
0137
0190
0241
.01
Teams . .,
.0031
.0040
.(051
.0060
.0071
.0090,
.0096
1.00
Cartina:
.0078
.0149
.0208
.0275|
.0346|
.0518,
.0746i
1.00
Excavation (Medium Digging}
1 Trenching
0597
0697
0790
0883
0974
1700
2403
3091 ' $1 50
2 Laying
.0189
.0220
0249
0307
.0440
.0577
.06391 1.50
3 Foreman
4 Tools, etc., etc
5 Calking
6 Lead . . .
.0180
.0056
.0106
0224
.0206
.0065
.0107
.0320
.0234
.0075
.0108
0431
.0265
.0084
.0111
0553
.0294
.0093
.0118
0683
.0350
0154
.0159
.0950
.0373
.0214
.0301
.1203
039 jj 3.00
.0602 7.2^ of land 2*
.0757 $2.25
.1600 5c. per pound.
7 Teams
8 Carting ... ...
.0070
0078
.0090
0149
.0115
0208
.0136
0275
.0160
.0346
.0203
0518
.0216
.0746
0228J $2.25
.1317' $1 per ton.
Total
1500
1854
2210
.2586
2975
4474
6030
.sero
1
Cost of Medium Digging reduced to $1 and Ic,
Trenching . .
.0331
.0465
0527
.0589
.06941 .1133
.1600' .2061
$1.00
Lay-in01
0126
0147
0166
0186
0205' 0293
0385 0426
1.00
foreman
Tools, etc., etc
Calking .,
.0060
.0008
0047
.0069
.0009
.0047
.0078
.0010
0048
.0088
.0012
.0:49
.0098 .0117
.00131 .0021
.00521 .0071
.01241 .0132
.0030' .0037
.0134J .0336
1.00
w*
$1.00
Lead . .
0045
0064
0086
0111
0137 0190
0241 0320
.01
Teams
0031
.0040
0051
.0060
.007H .0090
.0096 .0101
100
Carting
0078
0149
0208
0275
0346 0518
0746 .1317
l.CO
i
Excavation (Hard Digging).
1 Trenching
0860
0959
1053
1147
1300
2261
3264
$1 50
2 Laying ,
0271
0303
C333
0362
0411
05'-50
0669
1 50
3 Foreman
4 Tools etc., etc
.0260
0081
.0286
0093
.0314
0099
.0343
0109
.0372
0118
.0428
0201
.0452
0283
B.OO
7 2% of 1 and 2
5 Calking
6 Lead
.0106
0224
.0107
0320
.0108
0431
.0111
0553
.0118
0683
.0159
0950
.0301
1203
$2.25
7 Teams
0070
0090
0115
0136
0160
0203
i 216
' $2 25
8 Carting
.0078
.0149
.0208
.0275
.0346
.0513
.0746
$1 per ton.
Total
.1950
.2304
.2661
.3036
.3508
.5250
.7134
Cost of Hard Digging reduced to $1 and Ic.
Trenching
.0573
Laying
0181
Foreman
.0087
Tools, etc., etc
.0011
Calking . . .
0047
Lead ...
Teams . . .
.0045
0031
Carting
.0078
0202
.0095
.0013
0047
.0.064
.0040
.0149
.0702
.0222
0105
.0014
.0048
.0086
.0051
0208
.0765
.0241
0114
.0015
.0867
.0274
.0124
.0016
.0049! .0052
.01111 .0137
.0060, .0071
.0275 .0346
.21761..
.1507
.0353 0446J.
.0143 .0151'
.(039
.00711 .0134 ..
.0518 .0746!..
$100
1.00
1.00
w
$1.00
.01
1.00
1.00
The percentage for 24 inch includes blocks and wedges, and is 16-
9
This table, No. 5, contains the items in detail from which the cost of the labor
of laying water pipe, from 4 to 24 in. in diameter, given in Table No. 3, were
obtained.
The word "Trenching" is used for excavating and back-filling.
Throughout these tables Easy Digging is intended to correspond to exca-
vation in sand, etc.; Medium Digging to excavation in sand and gravel, etc.;
and Hard Digging to excavation in hard or moist clay, etc. The figures relat
ing to medium excavation are probably the most reliable for pipes that have a
diameter greater than 8 ins.
The prices given in any of the tables do not include the cost of engineering
and inspection.
SUPPLEMENT TO TABLES NOS. 2, 3, AND 5.
The following table gives the items of the actual cost of the labor of laying water pipe
ana excavating and back-filling for ihe same, upon which Tables Nos. 2, 3 and 5 were
based, with, the exception of the cost of carting pipe, which was considered at $1.00 per
ton. The table also shows a comparison of the items of actual cost with the amountx
that correspond to them in Tables Nos. 2, 3 and 5. The tabl" was computed from rec-
ords kept in Providence, with the exception of the data that refers to the 48-twc/i pipe,
which was obtained elsewhere.
Length of
pipe used
in feet.
Excavating, back-filling and laying.
3.
Calking.
4.
Teaming
Total of
1, *,3
and 4.
Total
corre-
sponding
to 1, L>, 3
and 4,
from
Table
No, 5,
etc.
Exca-
vating,
etc.
Laying,
etc.
Total of
i and 2.
Total
corre-
sponding
to 1 and
2 from
Table
No. 5,
etc.
4 inch. Medium Digging.
1,214
Ave., etc..
$.09460
$.09660
$.01300
$.00650
$.09460
$.09660
$.01300
$.00650
$.11410
$.11420
ti-inch, Easy Digging.
480
422
38U
533
201
378
401
416
364
181
320
711
545
1,501
228
265
485
266
442
Ave., etc..
$.06781
.10147
.06374
.07576
' .09127
.06874
06039
.07416
.05818
.08057
.05778
.05108
.05771
.07488
.07017
,06566
,05567
.05677
.06493
$.00959
.02177
.02253
.01444
.01975
.02063
01376
,01696
.01922
.1.1362
.01906
.01293
.01686
.02037
.01211
.01389
.01136
.01038
.01040
$.00338
.01173
.0,067
.01098
.00564
.01518
.00899
.01083
.OOJ25
.01373
.01053
.(,0854
.00950
.00480
.0(294
.00426
.00324
.00338
.00355
$.01171
.01173
.01067
.01098
.01237
.01518
.01011
.01083
.00928
.01373
.O10.i6
.00886
.00872
.00524
.00496
.00423
.00326
.00338
.00358
I
1
$.06825
$.01577
$.08402
$.08380
$.00827
$.00891
$.10120 | $.10350
6-inch, Medium, Digging.
526
666
242
7^2
727
144
318
164
428
1,039
138
597
129
131
311
273
406
Ave., etc..
$.09366
.(18989
.114996
.07204
.10241
.12185
.14775
.06288
.06301
.09476
.06594
.05717
.1031i>
.08992
.07180
.143nO
.087ul
$.02319
.01477
.01901
.01883
.01264
.04756
.01448
.01413
.01998
.01625
.02(538
.01540
.02155
.01637
.01479
.02817
.02227
$.01198
.01117
.00930
.00922
.01362
.02027
.01416
.00060
,01157
.01474
.01138
.01131
.01566
.01055
.00868
.015(51
.00999
$.01198
.01)981
.01115
.01014
.01208
.02034
,0(1919
.009(56
.01157
.01278
.01145
.01040
.01217
.01056
.00868
.01399
.00777
$.01140
$.08918
$.02034
$.10952
$.11230
$.01333
$.13425
$.13200
10
Supplement to Tables Nos. 2, 3, and 5. (Continued.)
Excavating, back-filling and laying.
Total
corre-
Length of
Total
corre-
sponding
to 1, 2, 3
pipe used
in feet.
14
Exca-
vating,
2.1
Laying,
etc
Total of
1 and 2.
sponding
to 1 and
2 from
8
Calking.
4.
Teaming
Total of
1, 2,3
and 4.
and 4,
from
Table
etc.
Table
No. 5,
Is o.5,
etc.
etc.
6-inch, Hard Digging.
265
$.08276
$.02301
$.01275
$.01698
307
.14378
.01645
01098
01101
Ave., etc..
$.11327
$.01973
$.13300
$.15480
$.01186
$.01399
$.15885
$.17450
8-inch, Medium Digging.
496
$.08794
$.02458
$.00907
$.00544
3,743
.06898
.01654
.00541
.00421
5*9
.07656
.01272
.00425
82
.OJ756
.01122
.01098
Ave., etc..
$.08276
$.01626
$.09902
$.12730
$.00743
$.00483
$.11130
$.14960
S-inch, Hard Digging.
157
$.12540
$.02924
$.02147
$.01433
Ave., etc
$.12540
$.02924
$.15464
$.17000
$.02147
$.01433
$.19044
$.19230
1'2-inch, Easy Digging.
1,255
$.09207
$.02388
$.01147
$.00609
Ave., etc
$.09207
$.02388
$.11595
$.12910
$.01147
$.00609
$.13351
$.15690
12-inch, Medium Digging.
1,132
$.09627
$.04595
$.11220
$.01193
$.00569
2 161
.12400
.01030
4283
.10070
01650
1 785
.13350
589
.16930
0°10)
Ave etc
$.13394
$.15750
$.01193
$.01337
$ 15920
$ 18530
16-inch, Medium Digging.
374
$ 22818
$.04904
$.27720
$.02107
$.02045
2,839
.25830
.01820
Ave., etc..
$.-6780
$.24900
$.02107
$.01933
$.30820
$.28520
20-inch, Easy Digging.
242
$.15876
$.04417
$.02508
$.02513
1 450
.15820
.08383
.03010
.04310
Ave., etc..
$.15848
$.05400
$.21250
$.29450
$.02759
$.03411
$.27420
$.34620
24-mc/i, Medium Digging. *(
19 416
$ 32820
$.07310
$.07570
$.02280
Ave, etc..
$.32820
$.07310
$.40130
$.41260
$.07570
$ 02280
$.49980
$.51110
11
Supplement to Tables Nos. 2, 3, and 5. (Continued.)
Excavating, back-filling and laying
1
Total
corre-
Total
sponding
Length of
pipe used
in feer,
Exca-
vating,
etc.
r 24
Laying,
etc.
Total of
1 and 2.
corre-
sponding
to 1 and
2 from
Table
3.
Calking.
4.
Teaming
Total of
1, 2,3
and!.
tol. 2, 3
and 4,
from
Table
No. 5,
No. 5,
etc.
etc.
21-inch, Medium Digg'fig (2.)
19,416
Ave., etc..
$.38940
$.08180
$.07570
$.07570
$.02230
i
^.36940
$.08180
$.45120
$.02280
$.54970 j
30-inch, Easy Digging.
561
Ave etc
$.37000
$.08420
$.08420
$.37000
48-inch, Medium Digging.
$1.950t $1.650t
t Including foreman.
* (1) Reduced by proportion to correspond to a depth of 4.67, from (2) 5.43 feet the ac-
tual depth.
t These figures include calking. The $1.95 is based upon ordinary labor at $1.75 per
day, and $2. 00 per day for laying. The $1.65 is based upon labor at $1.50 per day, and
was reduced by proportion from $1.95, assuming that the number of layers \, as 1-10 the
number of other laborers.
TABLE NO. 6.
COMPARISON BETWEEN THE TOTAL COST PER LINEAL FOOT OF THE LABOR OF LAYING
WATER PIPE AND EXCAVATING AND BACK-FILLING FOR THE SAME, ETC., GIVEN IN THE
PRECEDING TABLES, FOR MEDIUM DIGGING, AND WHAT THE TOTAL COST WOULD BE IF
THE TRENCHING, ETC., HAD BEEN BASED UPON $0.30 PER CUBIC YARD INSTEAD OF THE
AMOUNTS CHARGED TO TRENCHING, ETC., IN TABLE NO. 5. THE COST OF LAYING, ETC.,
HAS BEEN CONSIDERED THE SAME IN BCTH CASES.
SI-
~~ ~ -~
At $0.30 per cubic yard.
From Table No. 5.
8J5.5
fail*
SlfeS
Q
Laying,
etc.
Trenching,
etc.
Total.
Laying,
etc.
Trenching,
etc.
Total.
$.0676
.0886
.1099
.1334
.1583
.2235
.3)35
.4876
$.1382
.1506
,16o2
1758
.1890
.2160
.2447
.2742
$.2058
.2392
.2731
.3092
.3474
.4395
.5482
.7618
$ 0676
.0886
.1099
.1334
.1583
.2235
.3035
»4876
$.0833
.0968
.1111
.1252
.1392
.2239
3154
.3754
$.1509
.18£4
.2210
.2586
.2975
.4474
.6189
8630
+$.0549
+ .0538
4- .0521
•f .0506
4- .0498
— .0079
- .0707
- .1012
In this table, under the division headed "At $0.30 per Cubic Yard," the cost
per lineal foot of Trenching, etc., is based upon the excavation at $0.30 per
cubic yard, measured in the trench, instead of the actual cost, and takes the
place of the amounts charged in Table No. 5, for medium digging, to trench-
ing, teaming, and % the amount charged to foreman and tools, etc. (ex-
clusive of the cost of blocks and wedges, which are included in the cost of
Tools, etc., for 24-inch pipe, in Table No. 5). The figures relating to laying, etc.,
are the same as those charged in Table No. 5 for medium digging, to laying,
calking, lead, carting, and % the amount charged to foreman and tools, etc.
(exclusive of the cost of blocks and wedges, which are included in the cost of
tools, etc., for 24-inch pipe, in Table No. 5). In each instance, in calculating
the cubic contents of the trench, the width was considered as 2 feet more than
the diameter of the pipe and % of a foot deeper than the water line of the
same.
12
TABLE NO. 7.
AMOUNT PER LINEAL FOOT TO BE ADDED TO THE FIGURES GIVEN IN THE PRECEDING
TABLES FOR RELAYING PAVING, ETC., IN CASES WHEN THE STREETS ARE PAVED BE-
FORE THE WATER PIPE IS LAID.
Diameter of pipe in
inches
4
6
8
10
12
16
20
24
30
36
48
Cobble stones
Granite blocks laid
$0.12
$0.12
$0.12
$0.13
$0.13
$0.14
$0.16
$0.17
$0.18
$0.20
$0.23
upon a sand founda-
tion
0.18
0.18
0.18
0.19
0.20
0.22
0.24
0.25
0.27
0.30
0.35
Granite blocks, con-
crete foundation,
•
joints filled with pea
gravel and asphal-
,
tum
0.93
0.96
1.C1
1.05
1.09
1.18
1.32
.1.37
1 50
1.64
;1-M
The cost of a square yard of broken stone £ ins. thicfc, put properly in place
in a street, would be about $0.40.
The figures in this table were based upon a trench 3 ft. wider at the surface
of the ground than the diameter of the pipe, in order to allow for caving, etc.
The cobble stone paving was considered at $ 0.30 per square yard, the
granite blocks laid upon sand foundation at $0.45 per square yard, and the
granite blocks laid upon a concrete foundation, etc., at $3.46 per square yard.
The granite blocks were estimated to lay from 24 to 27 per square yard.
TABLE NO. 8.
AVERAGE COST OF LAYING LEAD SERVICE PIPE, INCLUDING EXCAVATING AND BACK-
FILLING FOR THE SAME.
Tap and stop.
Pipe per lineal foot.
Tap, stop,
"Wpicrht
Laying, etc.,
pil
3tc., including
)e.
tapping.
Lead
pipe.
Tin-lined
lead pipe.
%inch.
V-2 "t
I4 "
$6.00
6.23
6.81
8.67
10.71
}£ inch.
1 4 '
\y\ •
ite •
3.00 pounds.
4.00
4.75
6.00
9.00
10.00
$0.34
0.40
0.45
0.52
0.70
0.76
$0.52
0.64
0.73
r.88
1.24
1.36
The labor of excavating, back-filling and laying, etc., was considered in all
cases for lead pipe at $0.16 per foot. The price used for lead pipe was $0.06 per
pound, and the price for tin-lined lead pipe $0.12 per pound.
ENGINEERING NEWS
AND
AHERICAN RAILWAY JOURNAL
Published every Thursday at Tribune Building, New York.
23d Year. Five Dollars.
Engineering News contains each week twenty-
four pages of valuable reading matter, cover-
ing the entire field of engineering science in both
this and foreign countries. Railways, water-
works, bridges, manufacturing and technical, con-
tracting, mechanical and electrical industries are
fully reported, and detailed working drawings
and full descriptions are given of all the more im-
portant and note worthy structures and enterprises.
Record is kept of the proceedings of the engi-
neering and technical societies and clubs, and the
latest technical books and magazines are fully re-
viewed and discussed. The correspondence col-
umns contain communications from engineers,
contractors and others, regarding matters of cur-
rent interest.
The advertising columns and those of "Con-
struction News" constitute the most complete rec-
ord of the current contract work of engineering
in the United States that is obtainable. Together
they make a very complete index of new rail-
roads, new water-works, sewer building, street
paving, highways, river and harbor improve-
ment, bridge construction, public buildings erect-
ed, tunneling, pile driving, dredging, blasting op-
erations, experiments and actual work in concrete
and cement, electricity and gas, artesian wells,
canals, everything, in fact, having any relation to
public work, or the business of civil engineering
and contracting, while from the abstracts of bids
published from week to week, the prices of labor,
materials and other elements of cost of engineer-
ing work in different parts of the country are ob-
tainable.
A PARTIAL LIST
OF THE LATEST AND MOST
POPULAR ENGINEERING PUBLICATIONS
FOR SALE BY
THE ENGINEERING NEWS PUBLISHING CO.,
TRIBUNE BUILDING. NEW YORK.
BAKER. Surveying instruments $3.00
BAKER. Masonry Construction 5.00
BAUMEISTER. Cleaning and Sewerage of Cities,
2d Ed 2.50
BARSTOW. Cost of Laying Water Pipe 10
BERG. Buildings and Structures of American Rail-
roads 7.50
BLACK. Public Works of the U. S 5.00
BOUSCAREN. Specifications for Highway Bridges
and Viaducts of Iron and Steel 25
BOUSCAREN. Specifications for Railroad Bridges
and Viaducts of Iron and Steel 25
BOVEY. Hydraulics, A Treatise on 4.00
BUCHANAN. Tables of Squares of Feet and Inches. 2.00
BURKE. Brick for Street Pavements 50
BYRNES. Highway Construction 5.00
CHAMBERS. Mathematical Tables . . 1.75
CHURCH. Mechanics of Engineering G.OO
CLOUGH. What an Engineer Should Know About
Electricity 50
COOPER. Specifications of Iron and Steel Highway
Bridges and Viaducts, 1890, Last Ed 25
COOPER. Specifications of Irca and Steel Railroad
Bridges and Viaducts, 1890, Last Ed 25
COOPER. American Railroad Bridges 2.00
CRANDALL. Earthwork Tables 3 .50
CREHORE. Tables and Diagrams for Engineers ana
Architects. 15 Tables and 9 Diagrams, 25 and 50
Cents. List Sent on Request.
CROSS. Engineer's Field Book. 4th Ed. 1893.
Greatly Enlarged 1.00
CUMMINGS. Specifications for Electric Lighting of
Buildings 25
CLAY, CUNNINGHAM, STOWELL. Specifications
for Structural Steel 25
DAVIS. Table for Obtaining Differences of Altitude.
In Paper, 50 Cents; Cloth 1.00
DRINKER. Tunneling, Explosive Compounds and
Rock Drills 25.00
DU BOIS. Strains in Framed Structures 10.00
DU BOIS. Mechanics. Vols. 1 and 3, each . . 3.50
Vol. 2 4.00
DUNHAM. Plat and Profile Book 1.00
FANNING. Water Supply Engineering 5.00
FERREL. Treatise on the Winds 4.00
FISH. Lettering 1.00
FLYNN. Flow of Water in Channels 50
FLYNN. Hydraulic Tables 50
FOSTER. Wooden Trestle Bridges 5.00
FOWLER. Specifications for Roofs and Iron Build-
ings 25
FREITAG. Architectural Engineering 2.50
GENERAL INDEX TO ENGINEERING NEWS, 1874
to 1890 1.00
GILLMORE. Limes, Hydraulic Mortars and Cements 4.00
GOODHUE, Municipal Improvements 1.75
GOULD. Practical Hydraulic Formulas for the Dis-
tribution of Water Through Long Pipes. Revised
and Enlarged Edition 1.50
GOULD. Specifications for Dams and Reservoirs. . 25
GREENE. Graphics for Engineers, Architects and
Builders.
Part I., Roof Trusses 1.25
Part II., Bridge Trusses 2.50
Part III., Arches in Wood, Iron and Stone.2.50
HAZEN. Filtration of Public Water Supplies 2.00
HEATH'S Manual of Lime and Cement 2.50
HENCK. Field Book for R. R. Engineers 2.50
HERMANN. Steam Shovels and Steam Shovel Work. 1.00
HERSCHEL AND NORTH. Road Making and Main-
tenance 50
HERSCHEL. Continuous Revolving Draw Bridges. . 1.50
HODGMAN. Manual of Land Surveying 2.50
HODGMAN. Surveyor's Tables 1.00
HOWE. Continuous Girder, Theory of 1.25
HOWE. Diagrams for Bridge Engiueers 50
JACOBY. Plain Lettering, Text Book on 3.00
JOHNSON. Drainage Tables 10
JOHNSON. Surveying, Theory and Practice of 4.00
JOHNSON, BRYAN AND TURNEAURE. Designing of
Modern Framed btrusturas, Theory and Practice
in the 30.00
JOHNSON. Engineering Contracts and Speciflcations.4.00
JUDSON. City Roads and Pavements. Paper, 75;
Cloth 1.00
JACOBS. Storage Reservoirs 50
KATTE. Railroad Specifications.
No. 1. Construction of Graduation and
Masonry. Contents: Articles of
Agreement, Formation, Graduation,
Masonry, Including Specifications
for Laying Masonry in Freezing
Weather, Foundations, Timber,
Iron Work, General Provisions Ap-
plicable to All Work, Indemnity
Bond, 16 pages 25
No. 2. Standard Pile and Timber Trestle
Building 5
No. 3. Cross ties 5
. No. 4. Tracklaying 10
KENT. Mechanical Engineer's Pocket-Book 5.00
KIDDER. Architect's and Builder's Pocket-Book. . 4.00
LOVELL. Practical Switchwork 1.50
McCORD. Mechanical Drawing, in 2 parts. Each.. 2.50
McGEE. Areas of Triangles 10
McGEE. Metrical Equivalents 50
MAHAN. Civil Engineering 5.00
MERRIMAN AND BROOKS. Hand-Book for Sur-
veyors 2.00
MERRIMAN. Hydraulics, 5th Ed 4.00
MERRIMAN. Roofs and Bridges, A Text Book on.
Part I., Stresses in Simple Trusses.... 2.50
Part II., Graphic Statics 2.50
MERRIMAN AND JACOBY. Part III., Bridge Design. 5.00
MERRIMAN. Methods of Least Squares 2.00
MERRIMAN. Mechanics of Materials 4.00
MOORE. Tables for Irregular Cross Sections. Com-
putation 1.25
NEWMAN. Scamping Tricks 1.00
OCKERSON. Mississippi River, From St. Louis to the
Sea. Paper, $3.00; Cloth, $4.00; Morocco 5.00
OSBORN. Tables of Moments of Inertia 3.00
OSBORN AND HYDE. Specifications for Metal High-
way Bridge Superstructure 25
OSBORN AND HYDE. General Specifications for
Bridge Substructure 25
OSBORN AND HYDE. General Specifications for
Railway Bridges 25
PARSON. Landscape Gardening 3.50
PARSONS. Turnouts 25
PATTON. Civil Engineering 7.50
PATTON. Foundations 5.00.
PAUL. Railway Surveys and Resurveys 25
RAFTER AND BAKER. Sewage Disposal in the
United States 6.00
REA. Block Signaling 2.00
REID. Topographical Drawing and Sketching 5.00
REINHARDT. Lettering for Draughtsmen, Engi-
neers and Students 1.00
RICHARDS. Compressed Air 1.50
RICHARDS. Centrifugal Pumps 1.00
ROCKWELL. Roads and Pavements in France 1.25
SEARLES. Field Engineering 3.00
SEARLES. The Railroad Spiral 1.50
SHAW. Municipal Government in Great Britain.. 2.00
SHAW. Municipal Government in Europe 2.50
SHUNK. Field Engineer 2.50
SMITH. Pocket Geologist and Mineralogist 1.00
SMITH. Topographical Drawing 2.50
SIEBERT AND BIGGIN. Modern Stone Cutting and
Masonry 1.50
SPALDING. Hydraulic Cements, Testing and Using 1.00
SPALDING. Roads and Pavements 2.00
STALEY AND PIERSON. Separate System of Sew-
erage 3.00
PENCE. Stand Pipe Accidents and Failures 1.00
THACHER. Specifications for Highway Bridges... 25
THACHER. Specifications for Railroad Bridges 25
THOMSON. Specifications for Structural Steel for
R. R. Bridges 10
TORRE Y. Switch Layouts and Curve Easements. . 1.00
TRAUTWINE. Civil Engineer's Pocket-Book 5.00
TRAUTWINE. Excavations and Embankments V2.00
VEGA. Logarithmic Tables 2.25
WADDELL. Highway Bridge Specifications 50
WADDELL. Iron Highway Bridges 4.00
WADDELL. Live Loads for Railroad Bridges 25
WARING. Modern Methods of Sewage Disposal. . 2.00
WEGMANN. Masonry Dams, Design and Construc-
tion of 5.00
WELLINGTON. Economic Theory of the Location
of Railways 5.00
WELLINGTON. Excavation and Embankments 4.00
WELLINGTON, BAKER AND PENNIMAN. Car
Lighting 1.00
WELLINGTON. Piles and Pile Driving, 2d Ed 1.00
WESTON. Cost of Laying Cast Iron Water Pipe,
2d Ed 25
WHEELER. Civil Engineering 4.00
WILSON. Irrigation Engineering 4.00
Any of the above books will be sent post paid on re-
ceipt of price by
THE ENGINEERING NEWS PUBLISHING CO.
O,
LIBRARY
Due two
alter date.
118315