NUREG-0540
Vol. 4, No. 10
October 1-31, 1982
Office of Administration
U.S. Nuclear Regulatory Commission
% ^ V"
*****
Aviiiliiblc fmrn
NRC/GPO Siiln
nt of Dnairni'Mti
l 1'nntiini Office
Wnshmiium. I). 0. '^(MO?
A yo.it 's subscription consisis of 1? ISSUDS (or
this
Sinqla copius of this,
arc iiviiiliihli! from Niiiion.il Tctilmical
Infurcn.UJon Snrvico, SprinqfmUl, VA 22
icrofichi! of siiuilo tiopius <iui
lu from NRC/GPQ Salos Prourom
Washington. D, C. 2055B
NUREG-0540
Vol. 4, No. 10
Title List of
Documents Made Publicly Available
October 1-31, 1982
Division of Technical Information and Document Control
Office of Administration
U.S. Nuclear Regulatory Commission
Washington, D.C. 20555
CONTENTS
Preface v
Arrangement of Items by Docket Number ix
Alphabetic Arrangement of Docket Items by Facility Name xvii
Docketed Items
Low Level Radwaste Disposal Sites Docket 27 1
Domestic Licensing of Source Material Docket 40 1
Domestic Licensing of Production and Utilization Facilities Docket 50 7
Domestic Licensing of Special Nuclear Material Docket 70 328
Packaging of Radioactive Material for Transport and Transportation of
Radioactive Material Under Certain Conditions Docket 71 335
Nondocketed Items
10 CFR Commission Meeting Records 339
ACRS Advisory Committee on Reactor Safeguards 339
COMMISSION NRC Commissioners 340
CONTRACT NRC Contracts and Modifications 340
FOIA Freedom of Information Act Requests and Releases 347
GEN TECH IS Generic Technical Issues 364
I&E Inspection and Enforcement 365
MISC Public Document Room Miscellaneous 366
NUREG NUREG Reports and Related Correspondence 366
ORG Correspondence with Other Organizations 370
PR Proposed Rule 371
PRM Petition for Rulemaking 374
PROJ Projects - Predocket Licensing 374
PT 21 Noncompliance Reports and Related Correspondence 374
QA999 Quality Assurance Inspections 374
REGGD Regulatory Guides 376
RES Research and Technical Assistance Reports 377
REVIEW GROUP NRC Research Review Groups 378
SECY Position Papers Before the Commission 379
STATE PROG State Programs 379
TOPREP Vendor Reports and Related Correspondence 380
WASTE MOT Nuclear Waste Management 383
XPORTLIC Export and Import Licenses 384
Personal Author Index 389
Corporate Source Index 419
Report Number Index 449
Cross Reference of Enclosures to Principal Documents 45 1
Appendix A Definitions of Docket 50 Categories A-l
Appendix B Definitions of Nondocketed Categories B-l
111
PREFACE
The Tide List of Documents Made Publicly A variable is a monthly publication. It contains descriptions of the in-
formation received and generated by the U.S. Nuclear Regulatory Commission (NRC). This information includes
( 1 ) docketed material associated with civilian nuclear power plants and other uses of radioactive materials and (2)
nondocketed material received and generated by NRC pertinent to its role as a regulatory agency. As used here,
docketed does not refer to Court dockets; it refers to the system by which NRC maintains its regulatory records.
This series of documents is indexed by a Personal Author Index, a Corporate Source Index, and a Report Number
Index,
The docketed information contained in the Title List includes the information formerly issued through the Depart-
ment of Energy publication Power Reactor Docket Information, last published in January 1979. Microfiche of the
docketed information listed in the Title List is available for sale on a subscription basis from the National Technical
Information Service (NTIS). See NOTES at the end of the Preface for the complete NT1S address.
We encourage your comments, criticisms, and suggestions. In particular, if there are title descriptions that are not
meaningful, please let us know so that we can correct the data base. In so far as possible, we would like this docu-
ment to be a valuable part of your reference material.
DOCKETED ITEMS
The listings within Docket 50 are divided into the categories used for filing and searching in the NRC Public Docu-
ment Room. Those categories are:
A. Application/construction stage documents and correspondence
B. Utility Preliminary Safety Analysis Report (PSAR), amendments
C. Utility Environmental Report (ER), amendments and correspondence
D. NRC Draft and Final Environmental (Impact) Statements (DES and FES), and correspondence
E. NRC Safety Evaluation Report (SER), supplements and correspondence
F. Security, medical, emergency and fire-protection plans
G. Adjudicatory correspondence
H. General correspondence
I . Financial information
J. Insurance and indemnity information
K. Utility Final Safety Analysis Report (FSAR) and amendments
L, Limited work authorization and related correspondence
M. Antitrust correspondence
N. Antitrust hearing transcripts
O. Advisory Committee on Reactor Safeguards (ACRS) reports and correspondence
P. Operating license stage documents and correspondence
Q. Inspection reports, IE Bulletins and correspondence
R. Periodic operating reports and related correspondence
S. Reportable occurrences. LERs and related correspondence
T. Hearing transcripts on non-antitrust matters
U, Congressional/executive correspondence
V, Licensing operators and related correspondence
W. Decommissioning stage documents and correspondence
X Onsite low-level wastes storage
Appendix A sets forth those categories and describes [he materials available in each Omission of a category in the
listing for a docket indicates (hat no documents in that category were filed in the time period of the report.
The principal elements of the entries in the list are'
(T) P Operating license stage documents & correspondence
203090028 Responds to 820201 Itr requesting documents re environ qualification of
electrical equipment All nonpropnetary repts will be provided to Franklin Research
Ctr by 820408. Proprietary repts will be provided to NRC by 8205 10.
MILLS, L.M. (7) Tennessee Valley Authority. (T) 82/03/04 VASSALLO. D B
Operating Reactors Branch 2. Q Ip, 1216:254. 24XFiche: 50-259,82/03/04,
8203090028. , | ^ A
1. NRC/PDR Document category (see Appendix A)
2. NRC Accession Number (year, month, day, and sequence number of item).
3. Description of information contained in the document.
4. Personal author(s). An asterisk in this position indicates ihat there is no personal author,
5. Corporate, agency or nonindividual source.
6. Date of document described.
1. Recipient of document and NRC or corporate affiliation.
8. Pages in this document.
9. The NRC 48X microfiche designation for this document. This five-digit portion of this entry is the number of
the microfiche copy of this document that is available to NRC staff who have access to 48X microfiche files
10. This three-digit portion of this entry is the number of the frame on which this document starts.
1 1. The 24X Fiche designation consists of the docket number followed by the date of the document and the acces-
sion number for (he document. This designation provides the information needed by subscribers to the Na-
tional Technical Information Service docket microfiche to locate the document fiche.
12. If this space is blank, the document is available to the public only in the NRC Public Document Room, 1717 H
St., N.W., Washington, D.C. 20555. If this space is filled, it gives other sources for copies of the document.
The entry may be "Available at NRC" for sale; "Available at NT1S"; or "Available at GPO."
The Docketed Items list is arranged sequentially by Docket Number, category, and then by date of principal items.
Entries indented and preceded by a dash are items that were submitted as enclosures to principal items. In general,
indented items are not in accession number sequence. If the docketed document has a con tract (FIN) number or a
formal report number, it will appear in the last line of the item following entry 5.
NONDOCKETED ITEMS
The nondocketed items are divided into the categories used for filing and searching in the NRC Public Document
Room. These categories and their symbols are:
10CFR Commission Meeting Records
ACRS Advisory Committee on Reactor Safeguards
COMMISSION NRC Commissioners
CONTRACT NRC Contracts and Modifications
DISCLOSURE Financial Disclosure Information
FOIA ~- Freedom of Information Act Requests and Releases
GEN TECH I S Generic Technical Issues
I&E Inspection and Enforcement
MISC Public Document Room Miscellaneous
NUREG NUREG Reports and Related Correspondence
ORG Correspondence with Other Organizations
PR Proposed Rule
PRM Petition for Rulemakmg
PROJ Projects Predocket Licensing
PT21 Noncompliance Reports and Related Correspondence
QA999 Quality Assurance Inspections
REGGD Regulatory Guides
RES Research and Technical Assistance Reports
REVIEW GRP NRC Research Review Groups
RM Rulemakings
SECY Position Papers Before the Commission
STATE PROG State Programs
TOPREP Vendor Reports and Related Correspondence
WASH Regulatory Publications Pre-NUREG Series
WASTE MGT Nuclear Waste Management
XPORTL1C Export and Import Licenses
Appendix B sets forth these categories and describes the material available in each Omission of a category in the
listing for a docket indicates that no documents in that category were filed in the time period of the report.
The principal elements of the nondocketed items are;
(7) NU REG- NU REG Reports and Related Correspondence
8203090207 NU REG/CR- 1 672 V02
/ RISK ASSESSMENT METHODOLOGY DEVELOPMENT FOR WASTE ISOLATION
1 IN GEOLOGIC MEDIA. Technical Review of Documents
| NUREG/CR-1262, NUREG/CR-1376, NUREG/CR-1377, NUREG/CR-1397 &
(NUREG/CR-1608. -_^ - "O
STEVENS, C.A., FULLWOOD, R.A., BASIN, S.L. Science ApplicrnionsTInc.
FIN B-6694. SAI-262-8I-PA. 82/02/28, Division of Risk Analysis.
1 23 p. Available at NRC, 4 $6,00. fl 21 76:21 7, f
0-
1. Nondocketed category
2. NRC Accession Number (year, month, day, and sequence number of item)
3. NRC Report Number
4. Title and description of information contained in the document
5. Personal author(s). An asterisk in this position indicates that there is no personal author.
6. Corporate, agency or other nonindividual source.
7. Contract or financial (FIN) number (if any). If the document has a secondary report number, it will appear
following this entry.
8. Secondary report number assigned by originator.
9 Date of document described.
10, NRC organizational recipient.
1 1, Pages in document.
12. All NUREG-series documents are available for purchase at NRC. Information on ordering documents is given
below. All NUREG-series documents are also available at NTIS, Information on ordering from NTIS is also
given below.
13. Price for which NRC sells the document.
vn
U. The NRC 48X microfiche designation for (his document. This five-digit portion of this entry is the number of
the microfiche copy of this document that is available to NRC staff who have access to 48X microfiche files
15 This three-digit portion ol this entry is the number of the frame on which this document Mans.
The Nondocketed Items list is arranged sequentially by Accession Number within category, Indented items pre-
ceded bv a dash are enclosures to unmdented items.
NOTES.
1 The address for NRC is.
Director
Division of Technical Information and Document Control
U.S, Nuclear Regulatory Commission
Washington, D.C 20555
To place orders, send check or money order, payable to the Superintendent of Documents GPO Deposit Ac-
count holders may charge their orders by calling (301 ) 492-9530.
2 The address for NT1S is:
National Technical Information Service
Springfield, Virginia 22161
To place orders for or to obtain price information about NRC publications at NTIS, either write to NTIS or call
the Sales Desk at (703) 557-4650. Specify the NRC report number and title when you place your order. Publica-
tions can be charged to American Express credit cards; supply the chargecard number when placing your order
3. The address for the PDR is:
1717 H Street, N W,
Washington, D.C. 20555
To place orders, either write to the NRC PDR or call (202} 634-3274. When ordering documents listed in this
publication, please identify the Document Accession Number for each citation.
Paper copy and microfiche of the documents listed in this title list may be purchased. Reproduction charges for
duplication areas follows: (1) paper to paper is SO. 05 per page except for oversized documents and engineering
drawings, which vary from $0.50 to SI 00 per square foot; (2) microform to paper is $0.05 a page for pages on
microfiche and is $0.20 a square foot for a full-size print or SO. 25 for a reduced-size print ( 1 8" x 24" ) of a draw-
ing on an aperture card; and (3) microform to microform is $0. 10 per microfiche and $0 20 per aperture card.
Orders completed for mailing or for a special delivery service will have an additional fee for the actual mailing,
shipping, or delivery service rate. Unless a user requests special packing materials, there is no additional charge
by the contractor for handling and wrapping materials.
Please acknowledge a willingness to assume charges for all orders but do not send payments. Orders will be pro-
cessed and mailed with a bill from Literature Research C ompany. An account may be established with the
Literature Research Company by calling(703)-94l-801&
vin
ARRANGEMENT OF ITEMS
Docket Name Page
Low Level Ridwasfe Disposal Sites Docket 27
27-010 Beatty, NV, U.S. Ecology, Inc.
27-039 Sheffield, 1L, U.S. Ecology, Inc.
27-047 Barnwell, SC, Chem-Nuclear Systems, Inc.
27-048 Richiand, WA, U .S. Ecology, Inc.
Domestic Licensing of Source Material Docket 40
40-0017 Dow Chemical Co., Midland, MI
Union Carbide Corp. , Grand Junction, CO
Western Nuclear Corp., Jeffrey City, WY
NL Industries, Inc., Niagara Palls, NY
BV DOCKET NUMBER
40-0299
40-1162
40-1202
40-1341
Tennessee Valley Authority,
Chattanooga, TN
40-2061 Kerr-McGee Chemical Corp.,
Oklahoma City, OK
40-2259 Pathfinder Mines Corp., Rivcrton, WY
40-3392 Allied Chemical Corp. , Morristown, NJ
40-3453 Atlas Mineral, Inc., Denver, CO
40-6622 Pathfinder Mines Corp.,
Shirley Basin, WY
40-6659 Getty Oil Co. Petrotomlcs Co.,
Shirley Basin, WY
40-7580 Fansted, Inc., North Chicago, IL
40-8027 Kerr-McOee Nuclear Corp.,
Oklahoma City, OK
40-8084 Rio Algom Corp., Moab, UT
40-8102 Exxon Co. USA, Houston, TX
40-81 1 1 Kennecott Copper Corp., Salt Lake City, UT
40-8153 Lebanon Steel Foundry, Lebanon, PA
40-8355 Amax Speciality Metals Corp.,
Parkersburg, WV
40-8380 Rocky Mountain Energy Co.,
Broom field, CO
e
Docket
Name
Page
40-8452
Bear Creek Uranium Co., Casper, WY
4
1
40-8502
Wyoming Mineral Corp., Lakewood, CO
5
1
40-8577
Air Force, Dept, of, Vandenberg AFB, CA
5
1
40-8602
Silver King Mines, Inc., Casper, WY
5
1
40-8610
Stepan Chemical Co., Maywood, NJ
5
40-8632
Army, Dept. of, Chambersburg, PA
5
1
40-8681
Energy Fuels Nuclear, Inc., Denver, CO
5
1
40-8697
Rocky Mountain Energy Co., Denver, CO
6
2
2
40-8698
40-8714
Plateau Resources, Ltd.,
Grand Junction, CO
Cleveland-Cliffs Iron Co,, Cleveland, OH
6
6
2
40-8728
Teton Exploration Drilling Co., Inc.,
Casper, WY
6
2
40-8743
Conoco, Inc., Denver, CO
6
2
40-8745
Ogle Petroleum, Inc., Casper, WY
6
2
2
40-8768
40-8771
Kerr-McGee Nuclear Corp.,
Oklahoma City, OK
Mclapal Resources Co., Phoenix, AZ
6
6
3
40-8781
Teton Exploration Drilling Co,, Inc.,
Casper, WY
6
3
40-8786
Uranium Resources, Inc., Richardson, TX
7
3
40-8793
Conoco, Inc., Denver, CO
7
3
40-8820
Amax Environmental Services, Inc. ,
Golden, CO
7
4
40-8824
Target Research, Inc., Wharton, NJ
7
4
4
4
Domestic Licensing of Production and Utilization Facilities
Docket 50
50-3 Indian Point Station, Unit 1
50-10 Dresden Nuclear Power Station, Unit 1
7
8
4
50-13
Babcock & Wllcox Co. Critical Facility
9
4
50-20
Massachusetts Institute of Technology
Research Reader
9
Docket
50-22
50-27
50-29
50-54
50-57
50-62
50-70
50-72
50-83
50-133
50-142
50-148
50-151
50-155
50-160
50-170
50-182
50-184
50-186
50-188
50-192
50-199
50-201
50-206
50-208
50-213
50-219
50-220
50-223
50-228
50-237
50-244
Name
Westinghouse Test Reactor
Washington StateUniv. Research Reactor
Yankee-Rowe Nuclear Power Station
Union Carbide Research Reactor
StateUniv. of New York Research Reactor
Univ. of Virginia Research Reactor
General Electric Test Reactor
Univ. of Utah Research Reactor
Univ. of Florida Training Reactor
Humboldt Bay Power Plant, Unit 3
UCLA Training Rector
Univ. of Kansas Research Reactor
Univ. of Illinois Research Reactor
Big Rock Point Nuclear Plant
Georgia Institute of Technology
Research Reactor
National Naval Medical Center
PurdueUniv. Research Reactor
National Bureau of Standards Reactor
Univ. of Missouri Research Reactor
Kansas State Univ. Research Reactor
Univ. of Texas Research Reactor
Manhattan College Research Reactor
West Valley Reprocessing Plant
San Onofre Nuclear Station, Unit 1
Columbia Univ. Research Reactor
Haddam Neck Plant
Oyster Creek Nuclear Power Plant
Nine Mile Point Nuclear Station, Unit 1
Univ. of Lowell Research Reactor
Aerotest Radiography & Research Reactor
Dresden Nuclear Power Station, Unit 2
Robert Emmet Ginna Nuclear Plant, Unit 1
Millstone Nuclear Power Station, Unit 1
Page
Docket
9
50-247
9
50-249
9
50-250
12
50-251
12
50-254
12
50-255
12
50-259
13
50-260
13
50-261
13
50-263
13
50-264
14
50-265
14
50-266
14
50-267
17
50-269
50-270
17
50-271
18
50-272
18
50-275
18
50-277
18
50-278
18
50-280
18
50-281
18
50-282
19
50-285
22
50-286
22
50-287
23
50-289
26
28
50-293
28
50-295
28
50-296
30
50-298
34
50-301
Name Page
Indian Point Station, Unit 2 36
Dresden Nuclear Power Station, Unit 3 41
Turkey Point Plant, Unit 3 43
Turkey Point Plant, Unit 4 45
Quad-CitiesStation, Unit 1 47
Palisades Nuclear Plant 49
Browns Ferry Nuclear Power Station, Unit 1 5 1
Browns Ferry Nuclear Power Station, Unit 2 54
H. B. Robinson Plant, Unit 2 55
Monticello Nuclear Generating Plant 58
Dow Chemical Co. 60
Quad-Cities Station, Unit 2 60
Point Beach Nuclear Plant, Unit 1 62
Fort St. Vrain Nuclear Generating Station 66
Oconee Nuclear Station, Unit 1 67
Oconee Nuclear Station, Unit 2 69
Vermont Yankee Nuclear Power Station 71
Salem Nuclear Generating Station, Unit 1 73
Diablo Canyon Nuclear Power Plant, Unit 1 76
Peach Bottom Atomic Power Station, Unit 2 79
Peach Bottom Atomic Power Station, Unit 3 81
Surry Power Station, Unit 1 82
Surry Power Station, Unit 2 85
Prairie Island Nuclear Station, Unit 1 87
Fort Calhoun Station, Unit 1 89
Indian Point Station, Unit 3 90
Oconee Nuclear Station, Unit 3 93
Three Mile Island Nuclear Station, Unit 1 96
Pilgrim Nuclear Power Station, Unit 1 101
Zion Nuclear Power Station, Unit! 102
Browns Ferry Nuclear Power Station, Unit 3 106
Cooper Nuclear Station 107
Point Beach Nuclear Plant, Unit 2 108
Docket Name
50-302 Crystal River Nuclear Plant, Unit 3
50-304 Zion Nuclear Power Station, Unit 2
50-305 Kewaunee Nuclear Power Plant
50-306 Prairie Island Nuclear Station, Unit 2
50-309 Maine Yankee Atomic Power Plant
50-3 1 1 Salem Nuclear Generating Station, Unit 2
50-312 Rancho Seco Nuclear Generating Station
50-313 Arkansas Nuclear One, Unit 1
50-315 Donald C Cook Nuclear Power Plant, Unit I
50-316 Donald C. Cook Nuclear Power Plant, Unit 2
50-317 Calvert Cliffs Nuclear Power Plant, Unit 1
50-3 1 8 Calvert Cliffs Nuclear Power Plant, Unit 2
50-320 Three Mile Island Nuclear Station, Unit 2
50-321 Edwin I. Hatch Nuclear Plant, Unit 1
50-322 Shoreham Nuclear Power Station
50-323 Diablo Canyon Nuclear Power Plant, Unit 2
50-324 Brunswick Steam Electric Plant, Unit 2
50-325 Brunswick Steam Electric Plant, Unit 1
50-327 Sequoyah Nuclear Plant, Unit 1
50-328 Sequoyah Nuclear Plant, Unit 2
50-329 Midland Plant, Unll 1
50-330 Midland Plant, Unit 2
50-33 1 Duane Arnold Energy Center
50-333 James A. Fltzpatrlck Nuclear Power Plant
50-334 Beaver Valley Power Station, Unit 1
50-335 St. Lucie Plant, Unit 1
50-336 Millstone Nuclear Power Station, Unit 2
50-338 North Anna Power Station, Unit 1
50-339 North Anna Power Station, Unit 2
50-341 Enrico Fermi Atomic Power Plant, Unit 2
50-344 Trojan Nuclear Plant
50-346 Davis-Besse Nuclear Power Station, Unit 1
50-348 Joseph M. Farley Nuclear Plant, Unit 1
Page
Docket
111
50-352
113
50-353
116
50-354
118
50-355
119
50-358
122
50-361
126
50-362
129
50-363
131
50-364
134
50-366
137
50-367
141
50-368
144
50-369
146
50-370
148
50-373
152
50-374
154
50-382
159
50-387
164
50-388
166
50-389
168
50-390
172
50-391
176
50-395
178
50-397
180
50-400
182
50-401
184
50-402
186
50-403
189
50-404
192
50-405
194
50-409
195
50-410
197
50-412
Name
Limerick Generating Station, Unit 1
Limerick Generating Station, Unit 2
Hope Creek Nuclear Station, Unit 1
Hope Creek Nuclear Station, Unil 2
William H. Zimmer Nuclear Station, Unit 1
San Onofre Nuclear Station, Unit 2
San Onofre Nuclear Station, Unit 3
Forked River Nuclear Station, Unit 1
Joseph M. Farley Nuclear Plant, Unit 2
Edwin I, Hatch Nuclear Plant. Unit 2
Bailty Generating Station
Arkansas Nuclear One, Unit 2
William B. McGuire Nuclear Station, Unit 1
William B. McGuire Nuclear Station, Unit 2
LaSalle County Station, U nit 1
LaSalle County Station, Unit 2
Waterford Generating Station, Unit 3
Susquehanna Steam Electric Station, Unit 1
Susquehanna Steam Electric Station, Unit 2
St. Lucie Plant, Unit 2
Watts Bar Nuclear Plant, Unit 1
Watts Bar Nuclear Plant, Unit 2
Virgil C. Summer Nuclear Station, Unit 1
WPPSS Nuclear Project, Unit 2
Shewon Harris Nuclear Power Plant, Unit 1
Shearon Harris Nuclear Power Plant, Unit 2
Shearon Harris Nuclear Power Plant, Unit 3
Shearon Harris Nuclear Power Plant, Unit 4
North Anna Power Station, Unit 3
North Anna Power Station, Unit 4
La Crosse Boiling Water Reactor
Nine Mile Point Nuclear Station, Unit 2
Beaver Valley Power Station, Unit 2
201
203
204
204
206
209
210
210
213
21 5
216
218
221
222
226
228
230
234
235
238
241
244
246
248
251
254
254
254
254
255
257
258
Docket Name
50-413 Catawba Nuclear Station, Unit 2
50-414 Catawba Nuclear Station. Unit 2
50-416 Grand Gulf Nuclear Station, Unit 1
50-417 Grand Gulf Nuclear Station, Unit 2
50-423 Millstone Nuclear Power Station, Unit 3
50-424 Alvin W.VogtleNuclear Plant, Unit 1
50-425 Alvin W. Vogtle Nuclear Plant, Unit 2
50-434 Surry Power Station. Unit 3
50-435 Surry Power Station, Unit 4
STN-50-437 Floating Nuclear Plant
50-438 Bellefonte Nuclear Plant, Unit t
50-439 Bellefonte Nuclear Plant. Unit 2
50-440 Perry Nuclear Power Plant, Unit 1
50-441 Perry Nuclear Power Plant, Unit2
50-441 Seabrook Nuclear Station, Unit 1
50-444 Seabrook Nuclear Station, Unit 2
50-445 Comanche Peak Steam Electric Station,
Unitl
50-446 Comanche Peak Steam Electric Station,
Unit 2
STN-50-447 GESSAR-238
STN-50-454 Byron Station, Unit 1
STN-50-455 ByronStation, Unit2
STN-50-456 Braidwood Station, Unit 1
STN-50-457 Braidwood Station, Unit 2
50-458 River Bend Station, Unit 1
50-459 River Bend Station, Unit 2
50-460 WPPSS Nuclear Project, Unit 1
50-461 Clinton Power Station, Unit 1
50-462 Clinton Power Station, Unit 2
50-466 Aliens Creek Nuclear Station, Unit 1
STN-50-470 CESSAR System 80
Page
Docket
258
STN-50-485
261
STN-50-488
263
STN-50-489
267
STN -50-490
269
STN-50-491
269
STN-50-492
270
STN-50-493
271
STN-50-498
271
STN-50-499
271
STN-50-508
271
STN-50-509
274
50-513
276
50-514
280
50-515
284
STN-50-518
286
STN-50-519
287
STN-50-520
STN-50-521
289
50-522
290
50-523
29 1
STN-50-528
293
STN-50-529
295
STN-50-530
296
50-537
297
STN-50-546
298
STN-50-547
298
STN-50-553
299
STN-50-554
301
STN-50-556
301
STN-50-557
301
STN-50-566
301
STN-50-567
302
STN-50-584
Name Page
Sterling Power Nuclear Project, Unit 1 303
Perkins Nuclear Station, Unit 1 303
Perkins Nuclear Station, Unit 2 303
Perkins Nuclear Station, Unit 3 304
Cherokee Nuclear Station, Unit 1 304
Cherokee Nuclear Station, Unit 2 304
Cherokee Nuclear Station, Unit 3 304
South Texas Project, Unit 1 304
South Texas Project, Unit 2 305
WPPSS Nuclear Project, Unit 3 306
WPPSS Nuclear Project, Unit 5 307
WPPSS Nuclear Project, Unit 4 307
Pebble Springs Nuclear Plant, Unit 1 307
Pebble Springs Nuclear Plant, Unit 2 307
Hartsville Nuclear Plant, Unit 1 307
Hartsville Nuclear Plant, Unit 2 308
Hartsville Nuclear Plant, Unit 3 308
Hartsville Nuclear Plant, Unit 4 309
Skagit Nuclear Power Project, Unit 1 309
Skagit Nuclear Power Project, Unit2 310
Palo Verde Nuclear Station, Unit 1 311
Palo Verde Nuclear Station, Unit 2 314
Palo Verde Nuclear Station, Unit 3 316
Clinch River Breeder Reactor 3 1 8
Marble Hill Nuclear Station, Unit 1 325
Marble Hill Nuclear Station, Unit 2 326
Phipps Bend Nuclear Station, Unit 1 326
Phipps Bend Nuclear Station, Unit 2 326
Black Fox Station, Unit 1 327
Black Fox Station, Unit 2 327
Yellow Creek Nuclear Plant, Unit 1 327
Yellow Creek Nuclear Plant, Unit 2 327
Gibbsar, Glbbs & Hill 328
Xll
Docket Name
Domestic Licensing of Special Nuclear Material Docket 70
70-0007 ICN Pharmaceuticals, Inc.,
Irvine, CA
70-0025 Rockwell International Corp.,
Canoga Park, CA
70-0027 Babcock & Wilcox Co., Lynchburg, VA
70-0033 Texas Instruments, Inc. , Attleboro, MA
70-0036 Combustion Engineering, Inc., Windsor, CT
70-0135 Babcock & Wilcox Co., Apollo, PA
70-0143 Nuclear Fuel Services, Inc., Erwin, TN
70-0223 California, Univ. of, Los Angeles, CA
70-0278 Dow Chemical Co. , Midland, MI
70-0364 Babcock & Wilcox Co. , Apollo, PA
70-0371 UNC Naval Products, Inc., Uncasville, CT
70-0398 Commerce, Dept. of, Washington, DC
70-0416 Colorado State Univ., Ft. Collins, CO
70-0633 Pan American World Airways, Inc. ,
Patrick AFB, FL
70-0687 Union Carbide Corp., Tuxedo, NY
70-0753 Wheaton College, Wheaton, IL
70-0754 General Electric Co., Pleasanton, CA
70-0820 United Nuclear Corp.,
Wood River Junction, RI
70-0824 Babcock & Wilcox Co., Lynchburg, VA
70-1 100 Combustion Engineering, Inc., Windsor, CT
70-1 1 13 General Electric Co., Wilmington, NC
70-1 143 Westinghouse Electric Corp., Pittsburgh, PA
70-1 151 Westinghouse Electric Corp., Pittsburgh, PA
70-1201 Babcock & Wilcox Co., Lynchburg, VA
70-1257 Exxon Nuclear Co., Inc., Richland, WA
70-1510 Nuclear Assurance Corp., Atlanta, GA
70-1621 Duquesne Light Co., Pittsburgh, PA
70-1739 Tri-State Motor Transit Co., Joplln, MO
70-21 16 Lawrence General Hospital, Lawrence, MA
70-2650 St. John's Mercy Medical Center,
St, Louis, MO
age
Docket
Name
Page
70-2748
Scioto Memorial Hospital, Portsmouth, OH
334
70-2789
Missouri, Univ. of, Columbia, MO
334
328
70-2792
Lower Bucks Hospital, Bristol, PA
334
328
70-2873
Puerto Rico, Univ. of, Mayaguez, PR
334
328
70-2942
Harper-Grace Hospitals, Detroit, MI
334
328
70-2944
Duke Power Co., Charlotte, NC
334
329
70-2946
Louisiana Power & Light Co.,
New Orleans, LA
334
329
70-2949
Arizona Public Service Co., Phoenix, AZ
334
329
70-2955
Bellow International Co., Washington, DC
334
330
70-2957
Florida Power & Light Co. , Miami, FL
334
330
70-2968
Cleveland Electric Illuminating Co.,
330
Cleveland, OH
335
330
Packaging of Radioactive Material for Transport and Transportation
331
of Radioactive Material Under Certain Conditions Docket 71
331
71-0030
General Atomic Co.
335
71-0481
Monroe X-Ray Co., Inc.
335
331
71-5908
Model: DOT-6M Type B, Babcock &
331
Wilcox Co.
335
331
71-5926
Model: GE-100, General Electric Co.
335
331
71-5939
Model: GE- 1500, General Electric Co.
335
71-6115
Model: R1010-0032, Energy, Dept. of
335
331
71-6346
Model: FSV-U General Atomic Co.
335
332
71-6347
Model: FSV-3, General Atomic Co.
335
332
71-6574
Model: HN-200, Hlttman Nuclear*
332
Development Corp,
332
71-6601
Model: CNS 8-120, Chem-Nuclear Systems,
Inc.
jj;>
333
71-6639
Model: MH-1A, Army, Dept. of
335
333
71-6677
Model: LP-12, Energy, Dept. of
335
333
71-6678
Model: LP-50, Energy, Depl. of
336
333
71-6698
Model: NFS-4, Nuclear Fuel Services, Inc.
336
333
71-6703
Model: RG-I, General Atomic Co.
336
334
71-6745
Model; FSV-2, General Atomic Co.
336
334
71-9001
Model: IF-300, General Electric Co.
336
334
71-9010
Model: NLI-1/2, NL Industries, Inc.
336
Xlll
[)<xkt< Name
71-9034 Model. TRlGA-1, General Atomic Co
71-9037 Model- TR1GA-2. General Atomic Co.
71-9044 Model. GE-1600, General Elecmc Co
71-9057 Model- FPD-100, General Atomic Co
71-9079 Model. HN-100, Series 24 2A, Hlttman
Nuclear & Development Corp.
71-9080 Model: 9080. Hlttman Nuclear*
Development Corp.
7I-W8I Model. CNS-!600.Chem-Nuclear Systems,
Inc.
71-9086 Model- HN-IOO. Series I. Hlttman Nuclear
& Development Corp.
71-9089 Model HN-IOOS, Hiltinan Nuclear
& Development Corp.
Page
Docket
336
71-9091
336
71-9094
336
71-9096
336
71-9098
336
71-9111
336
71-9150
336
71-9151
336
71-9167
337
71-9964
Name
Model: 30A&30B, Gulf Nuclear Co.
Model: CNS I4-I95-H, Chem-Nuclcnr
Systems, Inc.
Model: CNS 21-300, Chem-Nuclear
Systems. Inc.
Model: UCC-20WC-2&2A, Union
Carbide Corp.
Model: CNS6-80-2, Chetn-Nuclear
Systems, Inc.
Model: PAT-2, Energy, Depl. of
Model: HN-lOO, Series 3, Hlttman Nuclenr
& Development Corp.
Model: Type B.Amersham Corp,
Model: LP-I2-1, Energy, Dept. of
5 1 '
ALPHABETIC ARRANGEMENT OF
Name Docket Page
Low Level Radwaste Disposal Siles Docket 27
Barnwctl, SC, Chem-Nuclear Systems, Inc.
Beatty, NV, U.S. Ecology, Inc.
Richland, WA, U.S. Ecology, Inc.
Sheffield, IL, U.S. Ecology, Inc.
Domestk Licensing of Source Material Docket 40
Air Force, Dept. of, Vandenberg AFB, CA
Allied Chemical Corp., Morristown, NJ
Amax Environmental Services, Inc., Golden, CO
Amax Speciality Metals Corp.,
Parkersburg, WV
Army, Dept. of, Chambcrsburg, PA
Atlas Mineral, Inc., Denver, CO
Bear Creek Uranium Co., Casper, WY
Cleveland-Cliffs Iron Co., Cleveland, OH
Conoco, Inc., Denver, CO
Conoco, Inc., Denver, CO
Dow Chemical Co., Midland, MI
Energy Fuels Nuclear, Inc. , Denver, CO
Exxon Co. USA, Houston, TX
Famteel, Inc., North Chicago, IL
Getty Oil Co. Peirotomlcs Co.,
Shirley Basin, WY
Kennecott Copper Corp., Salt Lake City, UT
Kerr-McOee Chemical Corp.,
Oklahoma City, OK
Kerr-McOee Nuclear Corp., Oklahoma City, OK
Kerr-McOee Nuclear Corp., Oklahoma City, OK
Lebanon Steel Foundry, Lebanon, PA
27-047
1
27-010
1
27-048
1
27-039
1
40-8577
5
40-3392
2
40-8820
7
40-8355
4
40-8632
5
40-3453
2
40-8452
4
40-8714
6
40-8743
6
40-8793
7
40-0017
1
40-8681
5
40-8102
4
40-7580
3
40-6659
3
40-8111
4
40-2061
2
40-8027
3
40-8768
6
40-8133
4
DOCKET ITEMS BY FACILITY NAME
Name Docket Page
Metapaf Resources Co., Phoenix, AZ
NL Industries, Inc., Niagara Falls, NY
Ogle Petroleum, Inc., Casper, WY
Pathfinder Mines Corp., R I vert on, WY
Pathfinder Mines Corp. , Shirley Basin, WY
Plateau Resources, Ltd., Grand Junction, CO
Rto Algom Corp, , Moab, UT
Rocky Mountain Energy Co., Broom Held, CO
Rocky Mountain Energy Co., Denver, CO
Silver King Mines, Inc., Casper, WY
Stepan Chemical Co,, May wood, NJ
Target Research, Inc., Wharton, NJ
Tennessee Valley Authority* Chattanooga, TK
Teton Exploration Drilling Co., Inc.,
Casper, WY 40*8728
Teton Exploration Drilling Co,, Inc. ,
Casper, WY 40-8781
Union Carbide Corp., Grand Junction, CO 40-0299
Uranium Resources, Inc., Richard son > TX 40-8786
Western Nuclear Corp., Jeffrey City, W Y 40-1 162
Wyoming Mineral Corp., Lakewood, CO 40-8302
40-8771
6
40-1202
2
40-8745
6
40-2259
2
40-6622
3
40-8698
6
40-8084
4
40-8380
4
40-8697
6
40-8602
5
40-8610
3
40-8824
7
40-134!
2
Dome*tk Licensing of Production and Utilization Ficllltln
Docket 50
Aerotest Radiography & Research Reactor
Aliens Creek Nuclear Station, Unit I
Alvin W. VogUe Nuclear Plant, Unit I
AMn W. Vogtle Nuclear Plant, Unit 2
Arkansas Nuclear One, Unit 1
50-228
50-466
50-424
30-425
50-313
7
2
5
28
301
269
270
129
Name Docket Page
Arkansas Nuclear One, Unit 2 50-368 216
Babcock&Wilcox Co. Critical Facility 50-13 9
BailSy Generating Station 50-367 215
Beaver Valley Power Station, Unit 1 50-334 1 80
Beaver Valley Power Station, Unit 2 50-41 2 258
Bellefonte Nuclear Plant, Unit I 50-438 271
Bellefonte Nuclear Plant, Unit 2 50-439 274
Big Rock Point Nuclear Plant 50-155 14
Black Fox Station, Unit 1 STN-50-556 327
Black Fox Station, Unit 2 STN-50-557 327
Braidwood Station. Unit 1 STN-50-456 295
Braidwood Station, U nit 2 STN-50-457 296
Browns Ferry Nuclear Power Station, Unit 1 50-259 51
Browns Ferry Nuclear Power Station, UniE2 50-260 54
Browns Ferry Nuclear Power Station, Unit 3 50-296 106
Brunswick Steam Electric Plant, Unit 1 50-325 159
Brunswick Steam Electric Plant, Unit 2 50-324 1 54
Byron Station, Unit 1 STN-50-454 291
Byron Station, Unit 2 STN-50-455 293
Callaway Plant, Unit 1 STN-50-483 302
Calvert Cliffs Nuclear Power Plant, Unit 1 50-317 137
Calverl Cliffs Nuclear Power Plant, Unit 2 50-318 141
Catawba Nuclear Station, Unit 1 50-413 258
Catawba Nuclear Station, Unit 2 50-414 261
'stem 80 STN.5ft.470 1/11
Name
Comanche Peak Steam Electric Station, Unit 1
Comanche Peak Steam Electric Station, Unit 2
Cooper Nuclear Station
Crystal River Nuclear Plant, Unit 3
Davis-Besse Nuclear Power Station, Unit 1
Diablo Canyon Nuclear Power Plant, Unit I
Diablo Canyon Nuclear Power Plant, Unit 2
Donald C. Cook Nuclear Power Plant, Unit 1
Donald C. Cook Nuclear Power Plant, Unit 2
Dow Chemical Co.
Dresden Nuclear Power Station, Unit I
Dresden Nuclear Power Station, Unit 2
Dresden Nuclear Power Station, Unit 3
Duane Arnold Energy Center
Edwin I. Hatch Nuclear Plant, Unit 1
Edwin I. Hatch Nuclear Plant, Unit 2
Enrico Fermi Atomic Power Plant, Unit 2
Floating Nuclear Plant
Forked River Nuclear Station, Unit I
Fort Calhoun Station, Unit 1
Fort St. Vrain Nuclear Generating Station
General Electric Test Reactor
Georgia Institute of Technology Research
Reactor
GESSAR-238
Gibbsar.Gibbs&Hill
Grand Gulf Nuclear Station, Unit 1
Grand Gulf Nuclear Station, Unit 2
H. B. Robinson Plant, Unit 2
Haddam Neck Plant
Hartsville Nuclear Plant, Unit 1
Hartsville Nuclear Plant, Unit 2
Docket
Page
50-445
287
50-446
289
50-298
107
50-302
HI
50-346
195
50-275
76
50-323
152
50-315
131
50-316
134
50-264
60
50-10
8
50-237
28
50-249
41
50-331
176
50-321
146
50-366
213
50-341
192
STN-50-437
271
50-363
210
50-285
89
50-267
66
50-70
12
50-160
17
STN-50-447
290
STN-50-584
328
50-416
263
50-417
267
50-261
56
50-213
22
STN-50-518
307
STN-50-519
308
Name
Hartsville Nuclear Plant, Unit 3
Hartsville Nuclear Plant, Unit 4
Hope Creek Nuclear Station, Unit 1
Hope Creek Nuclear Station, Unit 2
Humboldt Bay Power Plant, Unit 3
Indian Point Station, Unit 1
Indian Point Station, Unit 2
Indian Point Station, Unit 3
James A. Fitzpatrick Nuclear Power Plant
Joseph M. Farley Nuclear Plant, Unit 1
Joseph M. Farley Nuclear Plant, Unit 2
Kansas State Univ. Research Reactor
Kewaunee Nuclear Power Plant
La Crosse Boiling Water Reactor
LaSalle County Station, Unit 1
LaSalle County Station, Unit 2
Limerick Generating Station, Unit 1
Limerick Generating Station, Unit 2
Maine Yankee Atomic Power Plant
Manhattan College Research Reactor
Marble Hill Nuclear Station, Unit 1
Marble Hill Nuclear Station, Unit 2
Massachusetts Institute of Technology
Research Reactor
Midland Plant, Unit 1
Midland Plant, Unit 2
Millstone Nuclear Power Station, Unit 1
Millstone Nuclear Power Station, Unit 2
Millstone Nuclear Power Station, Unit 3
Montlcello Nuclear Generating Plant
National Bureau of Standards Reactor
National Naval Medical Center
Docket
Page
STN-50-520
308
STN-50-521
309
50-354
203
50-355
204
50-133
13
50-37
7
50-247
36
50-286
90
50-333
178
50-348
197
50-364
210
50-188
18
50-305
116
50-409
255
50-373
222
50-374
226
50-352
199
50-353
201
50-309
119
50-199
18
STN-50-546
325
STN-50-547
326
50-20
9
50-329
168
50-330
172
50-245
34
50-336
184
50-423
269
50-263
58
50-184
18
50-170
17
Name
Nine Mile Point Nuclear Station, Unit 1
Nine Mile Point Nuclear Station, Unit 2
North Anna Power Station, Unit 1
North Anna Power Station, Unit 2
North Anna Power Station, Unit 3
North Anna Power Station, Unit 4
Oconee Nuclear Station, Unit 1
Oconee Nuclear Station, Unit 2
Oconee Nuclear Station, Unit 3
Oyster Creek Nuclear Power Plant
Palisades Nuclear Plant
Palo Verde Nuclear Station, Unit 1
Palo Verde Nuclear Station, Unit 2
Palo Verde Nuclear Station, Unit 3
Peach Bottom Atomic Power Station, Unit 2
Peach Bottom Atomic Power Station, Unit 3
Pebble Springs Nuclear Plant, Unit 1
Pebble Springs Nuclear Plant, Unit 2
Perkins Nuclear Station, Unit 1
Perkins Nuclear Station, Unit 2
Perkins Nuclear Station, Unit 3
Perry Nuclear Power Plant, Unit 1
Perry Nuclear Power Plant, Unit 2
Phipps Bend Nuclear Station, Unit 1
Phipps Bend Nuclear Station, Unit 2
Pilgrim Nuclear Power Station, Unit 1
Point Beach Nuclear Plant, Unit 1
Point Beach Nuclear Plant, Unit 2
Prairie Island Nuclear Station, Unit 1
Prairie Island Nuclear Station, Unit 2
Purdue Univ. Research Reactor
Docket
Page
50-220
26
50-410
257
50-338
186
50-339
189
50-404
254
50-405
254
50-269
67
50-270
69
50-287
93
50-219
23
50-255
49
STN-50-528
311
STN-50-529
314
STN-50-530
316
50-277
79
50-278
81
50-514
307
50-515
307
STN-50-488
303
STN-50-489
303
STN-50-490
304
50-440
276
50-441
280
STN-50-553
326
STN-50-554
326
50-293
101
5O-266
62
50-301
108
50-282
87
50-306
118
50-182
18
Name Docket
Quad-Cities Station, Unit 1 50-254
Quad-Cities Station, Unit 2 50-265
RanchoSeco Nuclear Generating Station 50-312
River Bend Station, Unit 1 50-458
River Bend Station, Unit 2 50-459
Robert Emmet Ginna Nuclear Plant, Unit 1 50-244
Salem Nuclear Generating Station, Unit 1 50-272
Salem Nuclear Generating Station, Unit 2 50-3 1 1
San Onofre Nuclear Station, Unit 1 50-206
San Onofre Nuclear Station, Unit 2 50-361
San Onofre Nuclear Station, Unit 3 50-362
Scab rook Nuclear Station, Unit 1 50-443
Seabrook Nuclear Station, Unit 2 50-444
Sequoyah Nuclear Plant, Unit 1 50-327
Sequoyah Nuclear Plant, Unit 2 50-328
Shearon Harris Nuclear Power Plant, Unit 1 50-400
Shearon Harris Nuclear Power Plant, Unit 2 50-401
Shearon Harris Nuclear Power Plant, Unit 3 50-402
Shearon Harris Nuclear Power Plant, U nit 4 50-403
Shoreham Nuclear Power Station 50-322
Skagil Nuclear Power Project, Unit 1 50-522
Slcagit Nuclear Power Project, Unit 2 30-523
South Texas Project, Unit 1 STN-50-498
South Texas Project, Unit 2 STN-50-499
nant, Unit 1 50-333
Jnit? 50-389
Page
47
60
126
297
298
30
73
122
19
206
209
284
286
164
166
248
251
254
254
148
309
310
304
305
182
233
12
303
82
N ame
Susquehanna Steam Electric Station, Unit 1
Susquehanna Steam Electric Station, Unit 2
Three Mile Island Nuclear Station, Unit 1
Three Mile Island Nuclear Station, Unit 2
Trojan Nuclear Plant
Turkey Point Plant, Unit 3
Turkey Point Plant, Unit 4
UCLA Training Reactor
Union Carbide Research Reactor
Univ. of Florida Training Reactor
Univ. of Illinois Research Reactor
Univ. of Kansas Research Reactor
Univ. of Lowell Research Reactor
Univ. of Missouri Research Reactor
Univ. ofTexas Research Reactor
Univ. of Utah Research Reactor
Univ. of Virginia Research Reactor
Vermont Yankee Nuclear Power Station
Virgil C. Summer Nuclear Station, Unit 1
Washington State Univ. Research Reactor
Waterford Generating Station, Unit 3
Watts Bar Nuclear Plant, Unit 1
Watts Bar Nuclear Plant, Unit 2
West Valley Reprocessing Plant
Westinghouse Test Reactor
William B. McGuire Nuclear Station, Unit 1
William B, McGuire Nuclear Station, Unit 2
William H. Zimmer Nuclear Station, Unit I
Wolf Creek Generating Station
Docket
Page
50-387
230
50-388
234
30-289
96
50-320
144
50-344
194
50-250
43
50-251
45
50-142
13
50-54
12
50-83
13
50-151
14
50-148
14
50-223
28
50-186
IS
50-192
18
50-72
13
50-62
U
50-271
71
50-395
244
50-27
9
50-382
228
50-390
238
50-391
241
50-201
13
50-22
9
50-369
21ft
50-370
221
50-358
204
STN-50-482
301
Docket Page
50-513 307
STN-SO-509 307
50-29 9
STN-50-566 327
STN-50-567 327
50-295 102
50-304 113
Name
WPPSS Nuclear Project, Unit 4
WPPSS Nuclear Project, Unit 5
Yankee-Rowe Nuclear Power Station
Yellow Creek Nuclear Plant, Unit 1
Yellow Creek Nuclear Plant, Unit 2
Zion Nuclear Power Station, Unit 1
Zion Nuclear Power Station, Unit 2
Domestic Licensing of Special Nuclear Material Docket 70
Arizona Public Service Co., Phoenix, AZ 70-2949 334
Babcock & Wilcox Co., Apollo, PA 70-01 35 329
Babcoclc & Wilcox Co., Apollo, PA 70-0364 330
Babcock & Wilcox Co., Lynchburg, VA 70-0027 328
Babcock & Wilcox Co., Lynchburg, VA 70-0824 332
Babcock & Wilcox Co., Lynchburg, VA 70-1201 333
California, Univ. of, Los Angeles, CA 70-0223 330
Cleveland Electric Illuminating Co.,
Cleveland, OH 70-2968 335
Colorado State Univ., Ft. Collins, CO 70-0416 331
Combustion Engineering, Inc., Windsor, CT 70-0036 329
Combustion Engineering, Inc., Windsor, CT 70-1 100 332
Commerce, Dept. of, Washington, DC 70-0398 331
Dow Chemical Co., Midland, MI 70-0278 330
Duke Power Co., Charlotte, NC 70-2944 334
Duquesne Light Co., Pittsburgh, PA 70-1621 333
Edlow International Co., Washington, DC 70-2955 334
Exxon Nuclear Co., Inc., Richland, WA 70-1257 333
Florida Power & Light Co. , Miami, FL 70-2957 334
General Electric Co., Pleasanton, CA 70-0754 331
General Electric Co., Wilmington, NC 70-1 113 332
Harper-Grace Hospitals, Detroit, MI 70-2942 334
ICN Pharmaceuticals, Inc., Irvine, CA 70-0007 328
Lawrence General Hospital, Lawrence, MA 70-2116 334
Name Docket Page
Louisiana Power & Light Co., New Orleans, LA 70-2946 334
Lower Bucks Hospital, Bristol, PA 70-2792 334
Missouri, Univ. of, Columbia, MO 70-2789 334
Nuclear Assurance Corp., Atlanta, GA 70-1510 333
Nuclear Fuel Services, Inc., Erwin, TN 70-0143 329
Pan American World Airways, Inc.,
Patrick AFB, FL 70-0633 33 1
Puerto Rico, Univ. of, Mayaguez, PR 70-2873 334
Rockwell International Corp., Canoga Park , CA 70-0025 328
Scioto Memorial Hospital, Portsmouth, OH 70-2748 334
St. John's Mercy Medical Center, St. Louis. MO 70-2650 334
Texas Instruments, Inc., Attlcboro, MA 70-0033 328
Tri-State Motor Transit Co., Joplin, MO 70-1739 334
UNC Naval Products, Inc., Uncasville, CT 70-0371 330
Union Carbide Corp., Tuxedo, NY 70-0687 331
United Nuclear Corp., Wood River Junction, RI 70-0820 331
Westinghouse Electric Corp., Pittsburgh, PA 70- 1 143 332
Westinghouse Electric Corp., Pittsburgh, PA 70-1151 333
Wheaton College, Wheaton t IL 70-0753 331
Packaging of Radioactive Material for Transport and Transportation
of Radioactive Material Under Certain Conditions Docket 71
General Atomic Co. 71-0030 335
Model; 30A&30B, Gulf Nuclear Co. 71-9091 337
Model: 9080, Hittman Nuclear & Development
Corp. 71-9080 336
Model: CNS 14-195-H, Chem-Nuciear Systems,
Inc. 71-9094 337
Model: CNS 21-300. Chem-Nuclear Systems,
Inc. 71-9096 337
Model: CNS 8-120, Chem-Nuclear Systems, Inc. 71-6601 335
Model: CNS-1600, Chem-Nuclear Systems, Inc. 71-9081 336
Model: CNS6-80-2, Chem-Nuclear Systems,
Inc. 71-9111 337
Model: DOT-6M Type B. Babcock & Wilcox
Co. 71-5908 333
Name
Docket
Page
Name
Docket
Model: FPD-IOO, General Atomic Co. 71-9057 336
Model: FSV-I. General Atomic Co. 71-6346 335
Model: FSV-2, General Atomic Co. 71-6745 336
Model: FSV-3, General Atomic Co. 71-6347 335
Model: GE-IOO,GeneraIElcctricCo. 71-5926 335
Model: GE-1500, General Electric Co. 71-5939 335
Model- GE-1600, Genera) Electric Co. 71-9044 336
Model: HN-100, Series 1, Hittman Nuclear &
Development Corp. 71-9086 336
Model: HN-100, Series 2, 2A, Hittman Nuclear
& Development Corp. 71-9079 336
Model. HN-100, Scries 3, Hillman Nuclear &
Development Corp. 71-9151 337
Model: HN-100S, Hittman Nuclear &
Development Corp. 71-9089 337
Model: HN-200, Hittman Nuclear &
Development Corp. 71-6574 335
Model: 1F-300, General Electric Co. 71-9001 336
Model; LP-12, Energy, Dept. of
Model: LP-12-I, Energy, Dept. of
Model: LP-50, Energy, Dept. of
Model: MH-1A, Army, Dept. of
Model: NFS-4, Nuclear Fuel Services, Inc.
Model: NLI-1/2, NL Industries, Inc.
Model: PAT-2, Energy, Dept. of
Model: R1010-0032, Energy, Dept. of
Model: RG-1, General Atomic Co.
Model: TRIGA-1, General Atomic Co.
Model: TRIGA-2, General Atomic Co.
Model: Type B.Amersham Corp.
Model; UCC-20WC-2 & 2A, Union Carbide
Corp.
Monroe: X-Ray Co., Inc.
71-6677
3JJ
71-9964
331
71-6678
33*
71-6639
JJi
71-6698
334
71-9010
J3fi
71-9150
33T
71-6115
33J
71-6703
M6
71-9034
J36
71-9037
336
71-9167
3*7
71-9098
1
71-0481
3J3
DOCKETED ITEMS
LOW LEVEL RADWASTE DISPOSAL SITES
UiVET J7-OIQ QEATTV, NV. U 3 ECOLQGV. INC
21026Q304 PHQ-V-Ba Oil on 021012, shipment of low level raduaste
received from GE Vallecitas Nuclear Ctr containing boi m/
hole in side Admi ni stra 1 1 ve pen.ilty of *1500 levied Permit
suspended indefinitely
THDrlrtS.R I) Region 5, Orfice of Director 02/1O/J7 Ip
15931 34>1
DOCKET 27-0.1B HIGHLAND, HA, US ECtlLOGY, INC
6210130130 PNO-v-92~Oia on B210O4. notif i od that shipment oF low I
radmaste received on B209S7 from Smith Kline t, French Labs
mas in violation of DOT regulations 47CFIJ173 393<d) ft
173 4Q3Ib) Vendor license euspendBd effective 020923
THCMAS.R D Region 9, Office nf Director 82/10/05 Ip
13,73 039
27-039 SHEFFIELD, IL. u s CCOLOGV, INC
DOMESTIC LICENSING OF SOURCE MATERIAL
DOCKET dO-0017 DDK CHEMICAL CO , MIDLAND, HI
6210120320 Summary of 030908 steering committee meeting lu/lDNS, Sta to of
IL USG5 f, US Ecology to discuss results nf Phase II portion
or tritium migration study * to determine need for Phase II
investigations Exhibits encl
SIEFKEN, P L LP"i Level Waste Licensing Branch 02/09/20
HAWKINS. E F Lou Level Waste Licencing Branch 6pp 15687 236
6210100028 Responds to FOIA request for seven categories of documents
re Doui Chemical Co & Incineration of low level raduastp
Request For fee waiver granted Forwards listed documents
FELTON. J M Division of Rules and Records B2/QB/20 WILSON. A K
Affiliation UnJinouin 2pp 1574FJ 002 24X Flcho 50-264,02/00/30,
8210100028
6210120411 Notification of contract ticcuti on. Mod 5 to "Sheffield
Trench Cap Study " Contractor Ufi I v at IL
FUEENDR.C M TechniLal Assistance Contracts "ranch TIN 8-6968-.-:
82/09/28 DAVIB.J . SIEFKFN,D Office of Nuclear Material Safqty (.
Safeguards. Di rector Ip 15671 167
- -8310130419 Mod 5. revising task repts delivery schedul e. increasing
estimated c ost' revis ing voucher submittal & substituting
updated Manual Chapter 3202, to "Sheffield Trench Cap Studg "
PORTER. F W Illinois. Unw of, Urbana-t hampai go HAOAN, T f-
Oivision of Contracts FIN B-i969-2 S2/09/2B 4pp 15691 160
5^10030095 Joint motion to continue proceedings until 830201 to
provide add] time for settlement negotiations Certificate of
S.c *nt I
LES8V,R p Hearing Branch 3 WETTERMrtHN, M J US Ecologg.
Inc (Formerly Nuclear EngineBrlngl Q2/10/OI Atomic Safety and
Licensing Board Panel 3pp 1 5604 S'-id
S2100B0075 Qrdni' granting NRC ti applicant joint motion to continue
proceedings until 03O201
CGOI)HOPE,A C Atomic Safctu and Licencing Board Panel 32/10/06
Oi'fice of the Eiecutive Legal Director Ip 156-13 367
DOCKET 27-047 OARNWELL. SC. CHEM-NUCLEAR SYSTEMS. INC
F-21QI2013S Consents to transfer of Licenses 16-13536-01 t- 46-19 S24-D1
Irora Chem-Nuc lear 9ys, Inc to UMI Ho 1 d inos. I nc All c> i s ting
obligations t> responsibilities under curront license uil 1 1 be
applicable to tt binding upon subsidiary
.,.,,. . Office of Nuclear Material Safety i SflPoguards, Di rec tor
- Waste tlanagement, Inc 3pp 15672 I6/
DAVIS, J
S2/09/07
HU I ZENOA, P
i.-J10120Hfl Confirm* 820910 arrangements for J Davis 020931 site visit
prior to attending 820933-24 meeting; in Atlanta, CA
PANODUHN, G C Lou Level Waste Licensing Branch 82/07/13
FUIWIS.J Chm-NuclHar Suttem*. Ine Ip 19693 170
B31012046S Trip rept of 820701-08 vUlt to Columbia, BC to attend State
of SC hearings O n qualifications of Waste Mgt. Inc to conduct
radioactive matl* operations under licenses currently held
bu Chnm-Nuc I ear. Inc
PANQuURN.0 C Loui Level Wste Licensing Branch 0H/07/17
HAIWINS.E: r Loui Level Waste Licensing Dranch 4pp 13671 306
--02101Q0239 Application for reneiual of Matl/uyproduc t Licenses
31-00265-06,21-002^5-02. 21-00265-011, 21-00265-0'. BNM-I 253,
STO-527 'j R-10B authorijing any byproduct matl hBtueen
Atomic Numbers 3 I Q3, ti i tium, Po-210 & Am-24I
HOVLE.H H Doui Chemical Co 73/06/25 2pp 1574B 115
Flcha 50-264, 02/OB/20,aaiO!B002B
DOCKCT 40-0279 UNION MHBIDG CORP , GRAND JUNCTION, Cfl
8210250019 Formards "Investigation of Elevated Radioactivity
Measurements Around Union Carbide Corp Inactive Tailings
Area In Gas Hills, UY. " per License Amend 10
WQNQ.T Union Carbide Corp 82/0//30 PTTENC1LL,H Uranium
Recovery Licensing Dranch Ip 1UBOQ 260
9210250021 "Investigation of Elevated Radioactivity Measurements rtrniind
Union Carbide Carp Inactive Tailings Area in Qa s Hills. WV "
Union Carbide Corp 0^/07/30 lOpp 15908 261
83101902-16 Forwards "Semiannual ALARA Rep ti Jan-June 1902," por l.i
Condition 17
WONG, T Union Carbide Corp B2/07/03 LYON'i, P
Licensing Dranch Ip 15757 001
Uranium (locovnt-g
8210190256 "Semiannual ALAfIA Rep t. Jan-June 190H " Otie oversne map
encl Aperture card Is available In PDU
* Union Caroide Corp 02/09/03 531pp 15759 003
8210130607 Requests written declaration of intent or interest in tun
listed tailings situations resulting In pollution &
contamination of grounduater* of State of MY
FRANCIS. E Wyoming. State of 02/07/07 LINEMAN. J Uranium
Recovery Licensing Dranch 3pp 19692 335
S3 10220471 Forward! ravisieo lauier limits of detection for ft-226 t.
Th-230 in mater
LYONS.P J Union Caroide Corp B2/09/2S PETTENQILL.H Division
of Fuel Cycle t> htatarial Safety 2pp 19786 321
82(0210530 Requeiti detailed breakdown of revised rsclamatiun cost
ettlmat' in order to complete evaluation of 820 BO 4
submlttal Info should be provided by 821030
PETTENOILL.H J Uranium Recovery Lliensino Branch 82/09/30
LVOMS,P Union Carbide Corp 2pp 15782 363
DOCKETED ITEMS
DO:KET 40-11*2 WESTERN NUCLEAR CORP , JEFFREY CITY.
S2 10*30123 Forurdt IE Imp Rept 40-1 162/S2-OS on B20901 No
noncomf I unce noted
CROWN, Q Dlvmon of Vindor t Technical Program, B2/O9/29
UELLEH. T Uesttrn Nuclear. Inc (subi of Phelps Dodge Corp t 2pp
15770 Ml
IE Imp Rent 40-1143/62-02 on 820901 Mo nonconp 1 lance Tinted
fijor JrjJi inspected If mill ua.ite mjt activities
SHOPENH.M rl . CAIN.C L , EVEflETT, R J Divliipn of Vendor 1
technical Programs 82/09/21 4pp 15779 143
Responds to 9507O6 1 tr commeriliiig on D6i IE dec omifli
Of K*rr-McCee Rare Earbhs facility Final atatemant will
recogniie site as alternative ttorage/d isposal site for
other residue! in West Chicago. IL
CUNNINGHAM. R E Division of Fuel Cycle & Material Safpti)
CAHfLL.P C Environmental Protection Agency Jpp I59h0 Ol'i
9310250315 Response to Korr-McOee 830133 rsnue-Bl fo r tonjo I i da t i an at
License Amend 6 in/License Amend S for hadring purposes
City dots not object Svc list end
SPE1.MAH, H J Went Chicago. 1L SPELI1AN, H -J Haialil Sp e L ni.i" fc
Asiociabet BS/ 10/22 Commi ss inner s 3pp 157'W S2I
S ubro ]t) revieu of Split Roct Mill S3O630 annual technical
e valuation of pirfornanci of tailingi (abanlTient Embankment
pertorittii ai np(ttei) Ho Further action ntcesiarij
GAHCIA.P J Uraniun Hecover v Licensing Branch B2/10/05 Uranium
RefOvrrg Licensing Branch 2pp I57at 333
DOCKET 40-2259 PATHFINDER MIKES ccnp , IIWERTQN, wv
BaiOS7O054 Trip rapt nf 830326 site visit to tomplele annunl inB|'
FRANCIS, E . KEARWeVpD Pabhfindep Mines Corp
Pathfinder Kinei Corp 2pp 15026 111
oacKer 40-1502 NL INDUSTRIES, me , NIAGARA FALLS, NV
6210010418 Forward! IE Inp Rept ^0-1203/62-01 Inquiry conducted to
determine whether formtrlv llcanseii site meats current
criteria for release for unreitricbed e
KIWJEHAW.J D Division at Enoineenng !, Technical Progiams
B2/09/23 JACOBS, J L L IndustrlsJ- Inc 2pp 1 5570 217
B3100I0429 IE Imp Rept 40-1202/82-01 on 020595-0702 Inquiry conducted
tb determine oihtthr formerly licensed site meets current
criteria For release for unrestricted use Site meets
cTi,t*Tia
jQHANSEN, J M , KIWNEMAN. J H Region 1, Of f ice of Dir ec tor
3pp 1S570 21?
8510150607 Forwards "Qujrterlij Effluent Man it on 119 Dopt.Apr Jtuno IV*
per Licsnst Condition* 51 & 54
NUOEHT.E L pabhfinder Minos Corp 0a/OS/31 bCAHANO, fl rt Ur.t
Recovery Llceniing Branch |p 15715 330
8310150613 "Quarberly Effluent Monitonng H Dp 1. Apr- June 1 <it] J " lln
ovefiiie map end Aperture card is available in 1'DH
* Pathfinder Mines Corp 03/09/31 IDpp 15715 321
S2IOI30607 Requests written declaration of intent or interoit in tu
listed tailings situations resultirig in pollution t
contamination of groundua ters of State of UV
FRANCIS.E lJ a nmlng, State of 62/07/O7 L INDIAN. ,1 Uranium
Reco-very Licensing Branch 3pp 15692 335
8210010^34 Foruardi "Summai-,, of Radiological Survey of NL I-ntf ustn es
Mtagara Fails Plant-" final rept
JACCBS. J L ML Iniluatriei, Inc 02/M/24 JDHANBEN, J Renion t
Offic* of Dirsctor 3pp 15S70 332
8210010440 "Sunuiurt of RJd.olog icsl Survey of NL Industries Niagara
Falls Plant." final rept
LEIGH.!) M NL Industries. Inc 79/05/31 137pp 15570 324
DOCKEf 40-1311 TENNESSEE VALLEV AUTHORITY. CHATTAKaOGfl. TN
9210050422 FINAL ENVIRONMENTAL STATEMENT RELArED TO THE DECOMMISSIONING
OF EDOEMONr UHANIUH MILL Dprj.t Wo 40 -I3*i 7TiB t M
Valley Authority)
Offic* of Nuclear Hsterul Safety t, SafttiuarilstDirtct*,-
4 Ba/0 o/30 3 2 0pp Ava.UoU at ^C 00
^RR-HCOEE CHEHICAU CORP , OKLAHOMA CITV,
SA T n r 'M' e ' D ' 1 B M * ^Plication tg a^end L(,ii.
STA-5B3 to allnu dismantling of Bldgi 2,10.11 f. 21
SKELLE/.M J Kerr-KcG.e Corp 82/09/14 WEISS, J) Ht.
rfanaatment Branch Ip I5B36 314 f-'cfn't
"u ir..s p "SS M ias. a s /Mfli * NIXCIM ' HA ""-I-F-I
B31012O914 Adviies that equipment cost flnalys i s. ta 1 1 inga pond
reclamation bond analysis d rec lamaU on bona lununaru
consistent ui/approved reclamation plan for Pathfinder Lucti;
Me Mill tdiJings pond
SOLLefjaERGER, D , pETTCHUILUn J Uranium HeCQvury I ic en *ing llionih
92/09/20 Uranium Recovery licensing Branch 3pp ISi!i7j O'/^
S210S20161 Forwards IE Insp Rept 40-2299/B2-O1 on Q2072V-29 ft nolici
of violation
BRDWN.O D Divulon of Vendor & Technical Program! D2/Q9/i!.'
NUSENT. E L Patfifinifer Mines Corp 2pp 15770 033
8310330165 Notice of violation Prom insp on 0^0737-29
Division of Vendor & Technical Pronrams 03/09/27 In
15773 060 '
B2) 0330171 IE Insp Rept 40-2259/83-01 on 020727-39 None nmp 1 1 fl nc o ml
failure of personnel tp shouer or monitor for contamination
prior to leaving mill restricted area
UHrTTEN.JE , DROWN.fi C , EVERETT, R J Division of VentfQr A
Technical Projrams 02/09/17 llpp 15770 061
ALLIED CHEMICAL CORP , MQRRISTOUN, NJ
fcf "" f 3 """" >n 830701
are not proprietary
t t
ensing Branch Ip 1S716 33(,
-0210270081 B.,u..ti pj^MBt of amtnrf i t ,, nft
PPHC4 on for amend to Lic.ns, STA-563 t
dinanHino of Bldjs a, 10,11 J, 21
o al
Ba
DOCKET 40-3453 ATLAS MINERAL, INC , DENVER. CD
921036007? Poruard, second Barter 1982 ^ai-Urli, ren
l "'
B3I0130'163 Rtitutiti Infp on hiarine to be h.l
Ord.r CLI-82-S, , ,h"ji"!w B
Atla, Mineral. 82/00/18 70pp 1BBIO
839
for
E AtUi Hln.r.i.
DOCKETED ITEMS
521021C021 Reviews first quarter 1132 environ rnonitoring data ! dosa
calculations for nearest receptor required bij License
Coidition 47 Compliance W/40CFR190 stds mill be determined
mtitn neu site becomes operational
t,ARC!A,F> J , FETTENGtLl.rH J Uranium Recovery Licenung Branch
B2/09/20 Uranium Recovery Licensing Branch 4pp I57G2 216
8210230476 Responds to NRC B3DBI3 1 tr re violation* noted in IE insp
rept Corrective actions hijh audible alarm setpoint reset
Monthly surface contamination survey procedures improved
RUSSELL, J E Pathfinder Mines Corp 82/09/O3 BROUN: D Rug inn
4, Office nf Director 2pp 15779 131
Issues Amend 10 to License SUA-917 in response to SI 1904
request >j revised oy B2O43B Itr Amend add! Condition 54
delineating line of authority betuieen radiation safety
coordinator t, onsitfl individual
SMITH, R D Uranium Hecovery Licensing Branch 83/09/30 Atlas
Minerals 2p p 15783 311
- 3310210525 Recommends issuance of Amend 10 to License SUA-917 in
response to S1I304 request ! revised by B3Q43B 1 tr Amend
adds Condition 34 delineating line of authority between
radiation safety officer fc onsite individual
OABCIA. P J . PETTEfJGfLL.H J Uranium Recovery Licensing Branch
B2/09/30 Uranium Recovery Licensing Branch 5pp 1 57H2 313
DOCKET 40-66S9 GETTY OIL CO - PETROTQM1CS CD , SHIRLEY BASIN, HV
8S1022051O Forward* correspondence to & from State of MY re
unauthorized disposal of raduaste in (J mill tailings
d i sposa 1 fac t 1 i t i es
PFAFF.S J Getty OH Co IPetra tomi c s ) B2/OB/26 PETTENOILL' H J
Uranium Recovery Licensing Branch 4pp 1 57B6 117
9210310254 Forwards marked-up 1 tr from Gutty Oil Co to State of HV
indicating that requested info re wells b piezometers is
on file at NflC Elpresses desire for interagency cooperation
ACKERMAN.W C Wyoming. State of S3/0?/14 SMITH- D Diviuion of
Waste Management 4pp 15774 320
DI'CKET 40-6(-32 PATHFINDER MINES CC1RP , SHIRLEY BASIN, WV
ari055G03B Forwards State at WV B20731 request for
seepage 1 820721 response
RUSSELL J E Pathfinder Mines Corp 62/07/29
No Detailed Affiliation Given 5pp 1 5793 343
info re tailings
PETTENQILL, H NHC
2IOI5060I forwards one oversi/e revised topographic map per License
Condi i- 1 on 41 Aperture card is available in PDR
SMITH, J C Pathfinder Mines Corp B3/OEI/06 Uranium Recovery
Licensing Branch Ip 19715 335
8310130638 Advises that remedial actions proposed by licensee in
response to B1I1I3 IE Mill Appraisal Rept 4O-fi659/Bl-01
sufficient to correct weaknesses Ho licensing action mill be
required
JONES. S t , GARCIA, P J Uranium Recovery Licensing Branch
B3/09/20 Uranium Recovery Licensing Branch Epp 15672 269
6210210837 Revieui environ monitoring data '< 40CFRI90 dose calc ulationu
for Petrotomics Mill, lit response to B20604 Itr NRC LOniurs
w/results submitted by licensee
JONES.S Z , PETTENOILL.H J Uranium Recovery Licensing Branch
B2/09/30 Uranium Recovery Licensing Branch 5pp 157B2 3IB
a: 10100415 Forwards "Subsurface Migration Update 6 Ansuers to NR(-
Guestions '
MUtfDO:C.E S Pathfinder Mines Corp FJ3/QB/Q<b SHLLENfleRGER. D
Uranium Recovery Licensing Branch IP 15747 330
--Ei21u[B34PO "SubiuifaCB Migration Update & Answers to NRC Oueations
tight oversiie drauings one I Aperture cards aro available in
PDR
;,UHlKICk.E S , SMITH. J C Pathfinder Mines Corp 83/O3/31 /6pp
15747 221
O = 100703i33 Forwards IE Insp Rept 40-6622/BS-02 on 030713-16 i notice
at violation
D Division of Vendor f, Toclinical Programs B2/OQ/I3
.J E Pathfinder Mines Corp 2pp 1 S633 3IB
DOCKET 40-7580 FANSTEEL, INC , NORTH CHICAOO. IL
B210280L80 Ac k receipt of 520903 Itr informing HUG of steps taken to
correct violations noted in NRC B20B13 Itr i notice of
violation Addl info requested ulthtn 10 days
BRDyiJ.G D Division nf vendor t Technical Programs B3/IO/25
PIERHET, J A Fanstee] Metals (subs of Fan uteel , Inc ) Ip
15937 019
B2102Q01B<t Reipondi to NRC B20813 Itr & notice of violation C or^ac UVH
actions portable radiation detection instruments calibr
against tuo refi & lagged in lab log book
PIERRET.JA Fansteal Metals (subs of Fansteel. Inc I G2/Q9/OJJ
BROWNi G D Division of Vendor d Technical Program* Ip
1SS37 020
-8310070365 Notice of violation from I nip on B30713-I6
a Division of Vendor !. Technical Programs 82/08/13 2pp
1S631 320
DOCKET -10-8027 KERR-MCGEE NUCLEAR CORP , OKLAHOMA CITY, OK
- -03100703'?'! IE Insp Rept 40-6632/63-02 on G2Q713-I6 Noncompl lance noted
on 920715, audio I B alarm setpolnt on survey instrument
adjusted to level eicuadinj acceptable limit
CAIN. C L . MURRAY. B . EVERETT, R J Division of Vendor (- Technical
Programs G3/OB/10 ?pp 15633 322
B2102&D543 Forward i application far amend to Licanse QUD-lOlO to
construct it operate sludge calcining plant for purpose of
converting rafFlnate sludge to readily disposable form
SH6LLEY.W J Kerr-McOes Curp B2/09/01 PAQE, R Q Uranium Ful
Llcgniing Branch 3pp 15831 091
B?l0240013 Foruaril) revisad environ QA program, per Amend 7 to License
SUA-442
SMITH, J C Pathfinder Mines Corp B2/OB/3G Uranium Recovflry
Licensing Branch Ip 15314 160
9210240949 Application for amend to Licence SUB-1010 to construct I.
operate iludg* c'lclning plant For purpose of converting
raffinate slurfgo to rraillly iflaposshl* Form Ovenlie
drauingi encl Aperture cards available in PDR
Kerr-McOe* Corp 03/09/01 133pp 15831 094
--9210260014 Revised environ QA program
* Pathfinder Mines Corp 03/08/31 92p p
B21029Q177 Forwards stability review for Number S embankment per
Condition 43 of Amend B to License 5UA-442 Rept gives ftrong
evidence that Number 3 embankment functioning according to
design features
RUSSELL, J E Pathfinder Mines Corp B2/09/I4 BQLLENBEHO Uranium
Recovery Licensing Branch llpp 1 5B7<b 233
6210120644 Advises that preliminary review of application far renewal
of License SUA-442 complete General content acceptable but
add] info will oe needed Current license valid during period
at review of renewal application
PETTEIJOILL, H J Uranium Recovery Licensing Branch 82/09/30
RITCHIE, M 1 Pathfinder Minn Corp Ip 13404 233
9210520444 Acb receipt of B20903 Itr informing NRC of atepi taken to
correct violations noted in IE insp rept
DRCMJ, G D Region 4, Office of Director 82/09/27 RUBBELL.J E
Pathfinder Mines Corp Ip 1S779 130
aai02A0365 Foruiardi OK Btate Dipt of Heal th. Industrial Uitte Mg t Div
B 20824 Itr transmitting draft permit for uge of deep
disposal uiell for permanent disposal of treated raffinatei
in ref to application for amend to License SUB-1O10
SHELLEY. W J Kerr-McOee Corp 82/08/26 PACE- R Uranium fuel
Licentino Branch 6pp 15814 349
8310260976 Forwards initial comments pn DK State Dept of Health drift
permit for use of dep dispotal uell & replacement Page 1 to
parmiti correc ting nitrogen limit Page should be inserted
into 820826 Version
6HELLEY.W J Kerr-McOee Chemical Corp dub* of Kerr-rlcOee Corp )
82/OB/31 PAOE,R fl Uranium Fuel Licensing Branch 3pp
19814 361
B2102S04B7 Reipondt to B20824 Itr outlining addl requirement* for
injection uffl 1 permit Raqueiti option to operate wall at
pressures equal to pump capacity of 400 p<i Const method! J<
map at propaod monitoring location >nc 1
SHELLEY, W J Kerr-McGee Nuclear Corp 82/09/17 HENSCH, A
Oklahoma, State of 7flp 197B6 329
DOCKETED ITEMS
8210370242 Forwards application for renewal of License SUB-C010
Reneu-a I fee encl
SHELLEY, W J Kerr-McOee Corp- 83/09/2-1 PAGE. R Uranium Fuel
Licensing Branch 3pc- 15S*9 175
8210270247 Application, for renewal of License SUB-1010 to refine U
from yellcucake. to convert U to pure U ne rafluor I de
TMT tij-five averain drawings encl Aperture cards available
in PBR
SHELLEY,W J Kerr-cSee Corp B2/09/S4 320pp 15849 17B
DCCKET 40-8034 fi|O ALGGM COHP , MDAB. UT
-B2IQ3200eO Source Matl License SUA-1106 for Kennecott Copper Col p
author-inns possession of 2,000 kg U
HALARO-JC Atomic Energy Commission 71/12/15 Ip 15786 3'>U
-S2IQ2200B6 Application for amend to License SUA-1106 licensing plont
far storage only, of refined product
SFEDDEN. H R Kennecott Copper Corp 73/11/12 MALARO, J C
Atomic Energy Commission 2fp 15786 339
-6210320089 Certificate of disposition of ma 1 1 s mat I disposed in
compl lanca U/10CFR20
* Office of Nuclear Material Safety ! Sa f eguards, Dl rec tor
76/12/17 Ip 157B6 2iO
B2I0210515 Revieui tuio const rept* For IS-ft embankment raise In
Rio- Algoro Corp louer tailings dam performe-d by Dames 6 Moore
4 fleoion 4 No further action required b-g licensee
HOC-LSEY.R T , PETTENQILL, H J Uranium Race-very Licensing Branch
83/09/30 Uranium Recovery Licensing Drancft 4pp 15792 3O7
-0310230092 Confirms recent telcans re unrestricted use of ^cility
Radiation survey* to be performed !, results sent to NUC
CARR1CO, J B Licensing Management Branch 92/04/01 FQLSdK, B
KennBtott Copper Corp 15pp 157B6 2il
DOCKET 10-6102 EXXON CD USA, BOjaTON. TX
aSIO2701?5 Forwards "Environ Mon i torlng Data for Second Quarter, 1
puriu-ant to License Conrfition 36, inr I udlng ctase evaluation
at nearest recidence * results of environ monitoring
prop.""*
VARNICKi T P Enon Nuclear Co i tnc (iUlis of Ei i-on Corp 1
82/09/0? PETTFMQILLiH J Uranljm fl*cotferv Licensing Branch
15635 34?
92103701-97 "Environ Monitoring Data lor Second Quarter. 1 1P2 "
Enon Muc]dr Co Inc fsutis of Euan Corp } B 3/09/02
Hpp 15B3S 350
DOCKET 40-9153 LEBANON STEEL FOUNDRV. LEBANON. PA
92I037Q37O Application For reneua 1 of Source Matl License SUO-I H
authorliing possession of 5i kg 1/-235. enric h8iJ to [ess than
4X. f or USB in area radiation sys
ARNDLD.M L Lebanon Steel Foundry B2/09/33 Spp 15835 001
DOCKET 10-Q3S5 AMAX SPECIALITY METALS CORP , PARHERriQURO, W^
62052'100t)3 Forwards EIA of proposed site stab it nation at AMAX, Inc
Nl/QU.W A Cranium Fuel Licensing Branch 82/03/05 KERRIGAN, J
AMAX. Inc Ip 15&E2 023
B31-02605S7 Forwards fuaunAru. of airborne emissions at principal
radionucli-des (. "Sejniatinua 1 ALARA Rept, Jan- Juno 19B3. ''
pursuant to License Conditions I'l 6 35 No liquid effluents
discharged to unrestricted areas
YARWICtt, T P Eiion Nuclaar Co , Inc Club! of Eitcm Corp )
Ba/0?/03 Uranium Becovery Licencing Ora nc h 3pp 15030 360
9210260560 "Semiannual ALARA Re pt. Jan-June 19B2 "
* Ei ion Nuclear Co , Inc (subs of Enon Corji Y 02/09/03
7Spp 1SS30 263
&31QISQ531 Adviis that Euan general emergency attioti p lans, Bubmittud
iu/a20S26 Itr.ar. ac ceptao 1 H Cond i tian II to License BUA-1 13 1 ?
should be amended at Hated
JQNE9.S 2 : PETTWOILI..H J Uranium Recovery Licensing Branch
&2/O9/23 Uranium Flacovenj Uicenalng Branch Spp 15fa73 2O4
eaiOI20598 Natl fiei of Issuance of Amend 3 to License 5UA-I I3 1 ?, rovisinq
Licinie Condition 25 re emergency prejiareiln esc
SKITH.R D Uranium discovery Licensing Branch 02/09/23 EIIOI>
Corp Ip I9&72 350
GS10130432 Advlte* thdt no addl Pees FOT revi ui of applicitior For
Aminif 2 to License BUA-1139 required
HILLEfipW Llceni Fee Management Branch B3/1O/07
01LCHRIBT, J E Euan Carp Ip 15713 331
DOCKET 40-B1I1 KENNECDTT COPPEfl CORP , SALT LAKE CITY, UT
82lOEaOOii Advist* that NRC cloaad out licani* file* uhn UCDCISB
eipirid in 1776 u/o claieout survey Facility me-ots NRC
criteria for unreatr l ctd ut*
CARRJCfliJ B Ltcenilng Manaaoment Branch H3/1O/01 FOLBOH.B
KennernH- f"- " '
-8205240010 Negative declaration re storage of contaminated soil un
1 1 cense;
PAOE.R G Uranium Fuel Licensing Branch 03/05/03 4pp
IS6I2 O23
fl2053400Oi EIA supporting proposed site stao 1 1 1 lat ion
* Offict of Nuclear Material Safety ! Sa f eguards. Direc tor
52/04/30 ?0op 15612 025
DOCKEf 4O-B3BO ROCKY MDUNrAIH ENERGY CO , BRO.O.MFIELD. CO
S210I80378 Forwards "Orounduiater Restoration Ropt for fiocky Mountain
Energy-HalliAurtan-Hono power Nine Mile Lai B R&D In Situ
U Project "
NEUMANN, M fi Rockv Mountain Energy Co 92/OS/30 NEUMANN, M H
Uranium Recovery Licensing Branch ACKERMAN, U , GARLAND. U Ui|omn
State of 3ff 1S747 001
B21Q1B04O5 "Orounduater Restoration Kept for Rocki/ Mountain Eneray
Halllburton-Hono Pouer Nine Mile La*r RID In Situ U
Project " On* ove-riue map a ncl Aperture card is available
in POfl
. Rocfcy Mountain Energy Co B3/06/31 2I6pp 15747 004
DOCKET 40-S4Sa BEAR CREEK URANIUM CO , CASPER, WY
S210150644 foruards gradation resulti for Zone III sandstone in
tailings disposal area. In response to B20BQ& Itr Gradation
ttiti f-or Zont IV c layitone alio submitted
HEDLOCK, R L Bear Cre* Uranium Co BS/OB/20 BCARANO. R A
PETTENOILLiH J Uranium Recovery Licensing Branch !3pp
19715 212
921oaoi0084 Forwards Self-Bond BCU399-01 to Permit 399 for Bear Cruet
U Co
BRVAH.v J Hyeningi State of 82/OB/SO FLDRV,C Uranium Recavi
Licensing Branch 4pp 1BB14 149
a2IOSS044A ForonrJs self-bond indemnity agreement to Permit 399 for
Bear Creek U Kill betueen State of MY Dept of Environ
Quality * Union Pacific Corp Vendor agreed to indemnify any
liability Incurred by Bear Creek
BRYAW. V. J Wvoming. Stat* of B 2/08/30 FLORY, C Uranium Rocavc
Licensing Brnch Spp 15898 350
9210120634 ftevi *ui fiTit quarter tfBS environ monitoring data I- do an
calculations fop Baar Creek U Hill Licensa Conditions 17,49
1 54 latltfjad.
FLOHY.C. A , PETTENOILL.H J Uranium Recovery Licensing Branch
82/07/20. Uranium Recovery Licensing Branch 3fy 15672 273
tu 1 1 tM5>
DOCKET 10-5503 WYOMING MINERAL CORP . LAKDJaOD. CO
B.,10270160 Forwards "Irigaraij Mine &i te. Semiannual Activity fc
Monitoring RB pt, Jan-June. 1983 "
COh^OV, D W Wyoming Mineral Corp B2/09/25 Region 4, Office of
Director 2p a 1 5B35 332
8210270227 Application for amend to License EUC-I3SO to (ill aid
staballoy to be used in terchangeab I in/depleted U when
referring to U allays
SMITH. L E Army,Dept of, Headquarters Materiel Deve lopmen t I>
Readiness Command 62/O8/20 Dlvinon of Fuel Cycle t. Material
Safety 2p p 1 SS36 Q44
83102701B3 "Irigaraij Mine Si te. Semiannual Activity & Monitoring Hept,
Jan-June. 1982 "
* looming Mineral Corp B2/OB/25 I4pp 15Q35 334
B21004033S Discusses aitinon i a-ni trato relationships applied tn
groundwater restoration at WV Mineral Corp Ingaray U
Solution Mining Project in FES '/ responses to comments on
DCS
LOGSDON.M J , LINEMAN. J J Uranium Recovery Licensing Branch
B2/09/07 Uranium RecoveMj Licensing Branch 3pp 15597 102
DQ-KEF 40-8577 AIR FORCE, DEPf OF. VANDENBERG AFD, CA
621027017'' Forwards application for amend to License BUB-12B9,
reflecting changes in Western Space *, Missile Ccr radiation
protection committee ! use of TLD Instead of film badges
I1DLL1IIGER.L J Air Force, Dept of, Radioisotope Committee 82/09/14
Division or Fuel Cycle & Material Safety 4pp 15333 023
210270182 Application for amend to License SUB-12S9, refl ect I ng
changes in Western Space >' Missile Ctr radiation protection
committee Personnel resumes encl
I1EIN7.E L Air Force, Dept of, Hadioisotope CammitteB B2/09/14
J3op 15B35 027
DOCKET 40-0691 EfJEROV FUELS NUCLEAR, INC , DENVER. CO
9310220516 Submits questions re Amend H. Condition IS to License
5UA-I35B Rewording of composition of internal audit
committee suggested to alloui for reorgani la tion
BAKER.C E Energy Fuels Nuclear, [nc B2/OB/2Q OILLEN. D Uranium
Recovery Licensing Branch 2pp I 37Q6 036
8210250034 Application for amend to License SUA-1359, revi sing
representation on inteinal audit committee Si recipient of
semiannual ALARA audits
BAKER, C E Energy Fuels Nuclear, InC B3/08/30 OILLEN, D Uranium
Recovery Licensing Branch 3pp I 500B 347
8210250006 Foruards "Effluent t, Monitoring Rept, Apr-June 1982 "
BAKER, C E Energy Fuels Nuclear, Inc B2/OB/27 01LLEN, D Uranium
Recovery Licensing Branch lp 15BOB 133
S21025000S "Effluent t Monitoring Rep t, Apr-June 1982 "
Energy Fuels Nuclear, Inc B2/08/27 45pp 15SOB 136
B2102S0017 Forwards "Semiannual ALARA Audit Rept for Energy Fuels
Nuclear. Inc Whit* Mesa U Ml 11 , D land Ing, UT "
BAUER, C G Energy Fuels Nuclear, Inc 32/08/31 vINCELETTE,M D
Energy Fuels Nuclear, Inc lp 15914 303
DUCKET 40-8602 SILVER KING MINES. INC , CASPER, HV
621G350Q54 Forwards "Preoperationa 1 Radiological Environ Monitoring
Wept, Jan-June 1982 "
WCLFF.C E Silver King Mining, Inc B2/OB/27 SCARANO, R A
Uranium Recovery Licensing Branch 3pp 1 580S 016
--S2103SQOS& "Prcopcrationa 1 Radiologltal Environ Monitoring Rept,
Jan-June, 1982 "
' Sliver King Mining, Inc 82/OB/27 107pp 1 5BOB 019
321O27C040 Forwards three warranty doerfs per BSOBIO telcon All deeds to
be assigned to Silver King Mine, Inc as trustee For TVA Deeds
fu] f 1 1 1 lano ouinenhip requirements
WOLFF, C E Silver King Mining, Inc 03/03/20 PANTELL, S Bivlsion
of Fuel Cycle ', Material S^fcti; 1 6p p 15B36 09f>
--B310S6001B "Simiannual ALARA Audit Rept for Energy Fuels Nuclear, Inc
WhitB Msa U Mill.nianiflng.ur "
* Energy Fuels Nuclear, Inc B2/OB/31 llpp 15BH 306
B210260022 Application for amend to License SUA-13SS, author! ' i"3
ducharge of tjilingu into Cell 3 prior to completion of
conlt of Cell 4 safety dike Progressive const of safety dike
mill contain vol of potential spill
BAKER, C E Energy Fuels NucUar, Inc S2/09/02 OILLEN, Uranium
Recovery Licensing Branch Gpp I5B1431B
8210270209 Advises that schedule for initiation of const on Cell 3
safety dike at White Mesa mill be delayed [ wk beyond date
set forth in B2040B Itr Completion of safety dike may be
delayed until Spring 1933
DAKER.C E Energy Fuels Nuclear, Inc B2/09/03 OILLEN, D Uranium
Recovery Licensing Branch lp 1 3636 034
BOCXET 10-8610 STEFAN CHEMICAL CD , HrtYUODD. NJ
210260341 Forwards QA Program Insp Rept 99990001/03-13 on 020923
No nonconp I lance noted
KTNtJEMAN.J D Region 1. Office of Director, 02/10/32 FIORE,R A
Mayuiood, NJ FIORE.R A Flore (. Jaskot 2pp 1BB03 033
-83102603^5 QA Program Insp Rept 99990001/82-13 on B20923 Nn
nonconp 1 lance noted Major areai inspected measurement of
radiation levels 1 gathering of sediment samples in & along
Coles Brook , Mayiuaod, NJ
JQHANEEN, J , KINNEMAN.J D Region 1, Office of Director
O2/10/31 6pp 15SO3 035
-62-10260352 naquests info on whether proposed stream clearance project
would create haiard re ladluactive contamination in vicinity
of broofr Sketches encl
FIBRE,!) A Mayuood. NJ FIORE, R A Finre & Jasfcot 82/09/14
KINflEMAH.J D Region 1, Office of Director CQSOLITO.F Neiu
Jertey. State of 4PP 10003 041
DOCKET 40-9633 ARMY, DEPT QF, CHAMDERSBURO, PA
3310270223 Foruarifs application to amend License 9UC-13BO to allow
staballoy to be used interchangeably u/dpleted U uhen
referring to U alloys
TARAB, D K ArmU'Dept of, Headquarters Materiel Development &
Readiness Command 82/OS/27 Division of Fuel Cycle & Material
Safety lp 1 BB36 O43
S31027Q'133 Forwards "Tailings Cover Duslgn Revision" In response to
NRC B208I2 request for info re application for amend to
Llcinse BUA-I35B Proposnd reduction in thickness of tailings
reclamation cover adequate
BAKER, C E Energy Fuels Nuclear, Inc B3/09/03 OILLEN, D Uranium
Recovery Licensing Branth lp 15833 001
8210370439 "Tailing* Cover Design Revision
i D'Appolonla Consulting Engineersi Inc
19833 003
S2/OS/2S SSpp
82100-10363 Notification of 920913 meeting in/Energy Fuels Nuclear in
Silver Spring, MD to dlicusi Hh(t Met* Facility reclamation
p Ian, asioc iated cottt Ii proposed surety arrangements
OILLEN. M Uranium Recovery Licensing Branch 92/O9/0?
L!NHAW, J J , PETTENCILL.H J , FLEHINO, T, E NHC - No Detailed
Affiliation Oivtn 2pp 13597 191
B310120641 Recofnmenifs no action be taken on licensee request For
hearing on license .amend to require surety For
decommi islonl ng & reclamation issue may be mooted bu
licensee submitti! of revised reclamation plan
LI NEMAN, J J Uranium Recovery Licensing Branch 82/09/17
KLUC8IK.J F Office of the Oen*r*l Counsel lp 19672 27B
9210810532 Issuei Amend 15 to Licenn SUA-1350. in response to B209Q2
request Amend adds Itttn g to License Condition 24 allowing
licensee to forego const of Cell 3 safety diki
StllTHrfi D Uranium Recovery Licensing Branch 02/09/30 Energy
Fu.lt Nucllar, Inc lp 15762 329
B2 1 02 10534 Recommends issuance of Amend 1 15 to Licentt BUA-133Si in
response to 330902 nquist Amend add* Item g to License
Condition 26 allowing licensee to forepo const of Cell 3
ufity dike
OILLEN, D M Uranium Ricoverif Licensing Branch 02/10/04
Uranium Recovery Licensing Branch 2pp 15783 326,
DOCKETED ITEMS
DOCKET 10-8-697 RflCKV MGUNTAIN ENEflQY CO , DENVER, CD
83102B045I Advi,et that differences idtntlfied in tuo lab finding for
potassium value! due to different la* procedures or lab
capabilities Differences in pH value! dua to NML reporting
field values
SCHHITTDIEL, P Wyoming. State of B2/Q4/27 Wyoming. State of
4pp 15353 34k
8210250043 Forwards corncted rapt for radion ut 1 1 de eoruentrat i ons in
Pattern 2 injection b production uells from D20401
stabilliatfon jamples for. "Reno Creek Pattern S Restoration
Rept Addendum "
NEUMANN, M R Rocfcu Mountain Energy CD BS/0?/09 KALMAN. K
Uranium Recovery Licensing Branch 2pp IS77S 348
821Q040344 Discuiie* revieu af Itocku. Mountain Energy 19&2 second
quarterly rept For Reno Creek Site No fol Louup actions
necessary
KALMAIMt L , LINEHAN.J J Uranium Recovery Licensing B r ancn
Ba/09/HJ Uranium Recovery Licensing Branch 2pp 15597 IBS
DOCKET 40-94.98 PLATEAU RESOURCES, LTD , GRAND JUNCTION, CO
6310240577 Object! to conditions on comment a mint of mining in Unit 3
Collection of baseline water quality data in Unit 3 prior to
mining unnec essari; to insure environ protection of
grounduater
CATCHPOLE.Q J Ogle Petroleum, tnc
State of 3-pp I5B30 139
B3/Q9/02 FRANCIS, E Wyoming,
8210120571 Req.ueitl that aacand aquifer pump test be performed prior tr
licensing injiction of liilviant into Mining Unit 2 are lone
to evaluate confining nature of lower claystone layer
Previous teit Inadequate
LINEHAN.J J Uranium Recovery Licensing Branch B2/09/1O dgle
Petroleum. Inc Ip 15672 331
B210120604 Respond! to request to analyie Hint Unit 2 pump test
& associated data Uit af ratio method to determine vertical
hydraulic conductivity of louor aquitard invalid
HILLIAH3, R E HI 1 1 lami-Rob ine tte & Associates, Inc Q2/09/1O
Mllliajii-Rubinttta (. Associate*, Inc 9p p 15J.7S 352
82IOSS0046 Foruardi in-plant radon concentrations table for first half
af 1983, pr NRC requflit
SAUHDERB.O A Oglv Petroleum. Inc 62/09/10 SMITH. D Uranium
Rtcnvirv Licensing Branch Ip 15B&3 004
1210260019 Confirms 820030 c onvenat ion re temporary suipenslnn at
production at Shoataring Canuon LI processing facility
YeltDtiic-ike- In iya preientli) being racovered Plant ui II
return* milling i mining bg late 19Q4
OERDEMUN.F M Plateau RtourcBS. Ltd 63^03/34 FLEMING.! NRC -
Ma Detailed Affiliation. Given Ip 15014 317
00-0714 CLEVELAND-CLIFFS IROU CD . CLEVELflMD, DH
J31 052051 S HotLfltg that Cleveland Cliffs surface ditchargi operation
monitoring program comfllies u/re^uirHments of HPDES Permit
WY-OQ307B3 No furthar action required
PDHLE.J A . LIHEH/iM,J d Uranium Rocovtru Licensing Branch
B2/06/03 Uranium Recovery Llcansin^ Dranch Ip 157H6 O69
Jai022003ti ndvist that License SUA-13SH amended to roviue License
Condition 10 r authortud use of eipdnded ion eichang>i
reiin
SCAHANO.fl A Uranium Recovery LieBnsin} Dranch B2/09/30
LQUOERBACKi T E Cl ovaUnd-Cl if f s Iron Co 2pp 157B4 SB1.
IOCKET 10-673S TETON EXPLORATEON DRILLIHO CO , INC , CASPEfl. MY
1210230412 Forwards Stats of WV Dept of Environ Oualiti), Land
Quality Dlv 92051? Itr accsptJnj groundwattr stahil t lat ion
in H long flnul**r In advising of plugging op ione tuellc
APPEU-R fi Teton E'ploration Driliinn Co , Inc sa/oa/23
ROSSiF H Htc - Ma Detailed Affiliation Given Son J5B39
--B2102Q0049 "Radon Oas Concentration in uCi/ml. " Jan-June 19B2
4 Ogle Petroleum^ Inc B3/09/ 10 Ip 15BA3 005
DOCKET 40-3769 KEHR-MCCEE NUCLEAR CORP , OKLAHOMA CITY, OK
8210040:365 Diacusies review of Kerr-McGee Q-Sand Project quarterly rapt
For Jan-Mar 1 932 To date.no serious events identified
which necessitate change of operations or shutdown
WE&TBRODK.K , LIHEH^N.J J Uranium ftecoveru Licensing Dranch
B2/O9/07 Oranlirm Rncoverv Licensing Draneh 4pp 1 S597 193
DOCKET 40-8771 MELAPAI RESOURCES CO , PHOENIX.
621012053i Advisei that no violation found during NRC a SO 4 06-07
in-operational safety imp
FLETMtfJO.T E , MARTIN. D E Uranium Recovery Licensing Branch
aa/Q9/H2 Uranium Recovery Licensing Dranch Ip 1 5673 216
DUCKEF 4Q-B7B1 TGTON EXPLORATION DHIULINO CD , INC , CASPER, HY
82IOS700fi6 Eipr*sin appreciation for Ofportunity to revieu (. comin
on DES for Teton Eiploration Drilling Project Document
adequate re compatibility ui/local & regional coraprnhons 1 v*
planning
MATUSCHECKrR J Housing ft Urban Deve lopment. Dept of B2/QG/OS
SCAHANO. R A Uranium Recovery Licensing Dranch Ip 15Q36 197
I2I01S0494 Aifvlm that prupond lh-plant radiation lafetij pi-Qoram
acceptablt u/luted xceptions, Condi tion* 25 (> 30 af License
BLTA-1373 shauld be rvvitad as itated
SOLLGNDERGEH, D , PEITTENQILL, H J. Ur-anlum R.covBrv Licensing Iraneh
RDBB.FW Uran 1 urn Recovery Licensing Branch pp
nj.x,
6210350032 Commenti on application procesi to dati Ule of environ refi
for NRC pur-poin fimilar to State of WY format will save
conilderab 1 * preparation time
APPEL.R R United Nuclear Corp 02/08/23 SCARANO. R A Uranium
fleCBVerij Licenilng Branch 3pp 19FJ03 349
B210BiQQ94 Faruardi itate agency Commettts on project DEB Enc 1
analyiai support issuance of combined source It byproduct
matl license, sub j to specific licensing candlttani of other
localiitate: It federal stdt tt regulations
HER&CHLER.E Myomingr State of B3/OB/26 SCARANO, R A Uranium
Ricovery Llcenting Branch 9pp 15510 330
eai0260097 Catmint i on DES Sentence that mobile fire units ar
maintained by Convene County Rural Flri Control Asioc
should be added to Page 3-20
LW4DELL.B.E Huomino, State of B2/07/19 Uranium Recoverij
Licensing Branch IP 19B10 339
821QiiaOfil9 Forwards safety evaluation supporting isiuanci of Licn*e
SUA-1403 for commercial In itu leach U mine li recovery
plant
UUOLSEY, R.T , PETTENOILL. H J Uranium Recovery Licensing Branch
B2/09/30 Uranium Recovery Licensing Branch Ip, 1S672 238
831Qi:?OA24 Safty evaluation supporting issuance of License SUA-140
for commercial In situ leach U min* !< recovery plant.
MOOL8EY-F T , PETTENOILL, H J Uranium Retoveru Licenslno Branch
83/09/20 25pp. 19673 '239
DOCKETED ITEMS
"10-0796 URANIUM RESOURCES, INC , RICHARDSON, TX
O Advisory Committee on Reactor Safeguards reports & correspon donee
G2lOlB035ii Forwards response to NRC 850723 Itr re ma 1 f unc ti oning flow
PDB
PCLIZZA.HS Uranium Resources, Inc 82/00/12 L INEHAN. J J
Uraniun Recovery Licunsing Branch 3pp 1371)7 332
E31fMB0359 'Pond Soil Analysis :l
* Affiliation Unl-nown B2/O2/22 3pp 13747 337
B2L0250QI3 "North Platte Project Quarterly Hep t. 8304 1 5-O7 15 "
Uranium Resources. Inc 62/03/23 fcflpp 1 SBOB 183
.8210130479 Approves licensee restoration of RJ-D wellfield using
combination g roundua t er 5 weep t, reinjection of reverse
osmosis treated water Nells will oe restored to propor
levels at end of restoration
WESTGROQK. M D . LINEHAN, J J Uranium Recovery Licensing Branch
B2/O7/17 Uranium Recovery Licensing Branch 2pp 15672 O51
DOCKET 10-9793 CONOCO, INC , DENVER. CO
QS10D4034B Discusses CONOCO. Inc request for withdrawal of Ruby Ranch
In Si'.u U Project application Option of withdrawing
application granted
VOUMG, V A . LINEHAN, J J Uranium Recovery Licensing Branch
02/O9/10 Uranium Recovery Licensing Branch 4pp 15597 1H7
4Q-B920 AHA* ENVIRONMENTAL SERVICES, INC , GOLDEN, CD
E>;iQ25Q035 Advises that radioactive contaminated soil removed fraa
adjacent property owned by Chiyoda Steel Corp Author! la (,1 on
by Chiyoda to enter property ft remove soil encl
KEPPLER.P AflAX, Inc 02/09/31 NIXON,W NRr - No Detailed
Affiliation Give" 3pp 1 5308 349
0307180077 Forwards comments on PRA tudy dealing u/seiamic haiard
Validity of conclusions rest on quality of primary data
bases !i assumption! in both studies Repts are not valid risk
assessments due to data base limitations
POMEROY. P H Flondout Associates POMEROY, P W ACHS - Advisory
Committee on Reactor Safeguards 83/00/34 OKRENT, D ACRQ -
Advisory Comnittee on Reactor Safeguards 7pp 1 5B76 001 24K
Fiehe 50-003,82/08/24.0207100077
P Operating license staga documents (.
rres pond ence
6009080466 Forwards response to 800820 request for status rept re
Zion/Indian Point task action plan flesponsi b 1 11 1 1 es are in
area of severe accident mitigation features 81 not in interim
Operational actions portion
MEYER, J F Reactor Systems Branch BO/OB/25 NOVAK, T H Assistant
Director for Operating Reactors 2pp 034B4 009 24X
Fichc SO-Q03. QO/O0/25. B0090B0466
8010210036 Discusses SEP Branch review of sijs environ qualification
of safety-related electrical equipment for 11 SEP plants
MCKENNAi E M Systematic Evaluation Program Branch BO/07/30
LAINAB.G C Division of Licensing 2pp 03647 209 24X
Flche 50-003,80/09/30,0010310036
8210120103 Addl response to FOIA request for nine categories of records
generated by present NflC Commissi oner s. pr imarl ly Chairman
Palladino li Commiss ianflr Roberts & Uhlte House Forwards
App B documents
FELTON,J M Division of Rules and Records B2/O7/12 UDELL. R A
Critical Mass Energi, Project 3pp 15690 117 24X
Fiche 50-000,82/07/12,0210120103
92101201BB Notifies that facility ul 1 1 be d ecorammlssloned by uti 1
rather than make ECCS mods to meet NHC criteria Utll
proposed research funding cannot be provided Recommends
approval of proposed Itr to utll
ZECH.O NRC - No Detailed Affiliation Given B1/1I/OS
ROBERTS, T M Commissioners lp 15690 160 24X
Flche 30-000, B2/07/1S- B3IOI30103
DDCKET 40-8924 TARGET RESEARCH, INC , WHAfJTDN, NJ
8210370373 Forwards application for source mall license, authori I Ing
nosiest] on of 6, OOO kg U a 1 loy, enr 1 ch ed to If BY. U-23B, for
usa in assembling armor-p I en ing projectiles
QAKUM.K E Target Research, Inc 82/O9/15 Division of Fual
Cycle t, rlatsrial Safety Ip 15035 S20
'-13310270370 Application for license to possess 6,000 kg depleted U
alloy, enriched to 99 8X U-S38, f or use in assembling
flrmor-pierc Ing projectiles
GIWDAGNO.V Target Research, Inc H2/Q9/I4 17pp 1 5B35 3P1
8210010401 Forwards application to amend Licenses DPR-26 & DPfl-5,
changing Tech Specs re facility organiiatlon t Unit 2
Tech Specs 3 6 & 4 4 r containment isolation valves 3 12 &
4 12 in pipe line! Clasi I, II t, III fees encl
O'TODLE.J D Consolidated Ediion Co of Neui York B3/OH/31
VflROA. S A Operating Reactors Branch 1 3pp 15572 211 34X
Flche 50-003, B3/OB/31. 0210010401
B210010409 Application to amend Licenses DPR-26 & DPR-3, revis 1 ng Tech
Spec Figures 3 3 6 6 3-2 re facility organiiation far
Units 1 !< a, res(iec tivoty
O'TOOLG.J D Consolidated Edison Co of New York 82/08/31 Hpp
13372 211 24X Flche 50-003,82/08/31,0210010401
DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES
DOCKET 50-3 INDIAN POINT STATION. UNIT I
F Security, medical, emergency & fire protection plans
-B210Q10414 Proposed revisions to Tech Spec Figures 3 a & 6 2-2,
rvflicting change in organliational structure to include
position of operation) superintendent Safety assessment
encl
* Consolidated Edison Co of Neu York 03/08/31 6pp
19973 216 24X Fiche 50-003,03/08/31,3210010401
9210280148 Releases public version of revised emergency plan
imp 1 iment ing procedures
TELTON, J M Division of Rules and Records 02/1O/13 Document
Management Branch Ip 1 5B62 371 24X Fiche 50-003.83/10/12,
B21O28014B
B2IOS90154 Forwards public version of revisions to Emergency Plan
Implementing procedures IP-1030 re airborne radioiodine
determination i IP-1046 re utll personnel responsibilities
during Unit 3 emergencies
Q'TOaLE,J D Consolidated Edison Co of Neiu York B2/1O/01
H/.YNES.R C fiagipn 1, Office of Director 3pp 13862 372 24X
Fiche 50-003,82/10/12,8210380118
-8210010435 Application to amend License DPR-26i revising Tech Specs
3 6 & 4 4 t o establish requirements for action required when
containment isolation valves are Inoperable & reflect
changes to isolation valve provisions
O'TOOLE, J D Consolidated Edison Co of Hew York 62/08/31 Bpo
15973 222 24K Fiche 30-003, B2/OB/31, 02 1O010401
-8210010438 Proposed revisions to Tech Specs 3 6 b 4 4, estab 1 1 sli ing
specific requirements for action during inonerabi li ty of
containment Isolation valves & reflecting changes It add i tons
to Isolation valve provision! Safety assessment Encl
* Consolidated Edison Co of Neu York B2/OB/31 20pp
1B37S 224 24X Fiche 50-003.83/08/31,8310010401
8210580159 Public version of revisions to Emergency Plan Implementing
Procedures IP-(020 re airborne radioiodlne determination <
IP-1046 re utll personnel responsibilities during Unit 3
emergent! es
* Consolidated Edison Co of Neui York 82/O9/OI 16pp
1B862 275 24X Fiche 30-003, B3/10/ 12. 831028014B
-B210010443 Application to amend License DPR-26, revi s inn Tech Spec
Sections 3 13 & 4 13 to defflect editorial change
safety-related pipe lines Si to efflsct editorial change
O'TOOLErJ D Consolidated Edison Co of Neui York 83/08/31 3pp
15573 344 24X Flchi 30-003,02/03/31,8210010401
-8310010449 Proposed revisions to Tech Spec Sections 3 13 tt 4 12j
reflecting redesigned support sus for lif ety-related pipa
lines i. to efftct editorial change Safety assessment end.
* Consolidated Edison Co of hteui York 02/08/31 IBpp
1SS72 246 24X Fichs 50-003, B3/OB/31 , SSI 0010401
DOCKETED ITEMS
Inspection reports- IE Bulletins
IE info flat.ce 80-35. Suppl 1. "Liking S. Dulodged 1-125
'Dwision ofVueT Facilities. Materials fc Safeguards
cinioI.S.t.d EdMon Cc of N.u Vor k 6pp .5761 S5
24 < Fich. 50- 000. E)a/l 0/04,6303190333
IE Bulletin B3-03, "Streis Corrosion Cracking in Th>cl-
arje-Dianf tar. Stainless Steel. Rec irculation B-js
Pipino at OUR Plants " Sve Hit encl
DEYCUrjO.n C Director'* Office, Office of Inspection and
Enforcer-enl B2/1O/I4 Consolidated Ednon Co of Neu Vor t
I33pp IS310 IS5 24X F.cAe 50-000. S2/10/ 14. B30B11023B
DOCKET 50-10 DRESDEN NUCLEAR POWER STATION, UNIT I
F Security, medical, emrjenc<J t, fire protection plans
Fteledsex public version of reviled generating station
snerjeiKY plan corporate cnmnand ctr emergency plan
Lipplefn'n t ing procedure
FFt-TOW.J M Division of Rules and Hecords 33/09/16 Document
HaniSBflient Branch Ip 15564 122 24K Fi che 90-000. B2/09/li,
P Operating license stage documenta 6 correspondence
9210240526 Forward* Revision 3 of Chapter of "Offsite Dose
GuLDE/J^'c" 1 "co^on^ealth Edison Co B2/10/G6 CASE, E e afrit, of
Nuclear Reactor Reoulatmn. D.rector 2pp 15B05 137 24X
Fiche 50-000,82/10/06,8210260526
BJI0360542 Revision 3 of Chapter 9 of "Offsite Hose Calculation
/"comonuealth Edison Co 82/09/30 B3 P p 1 5B05 139 2<1X
Fiche 50-000,82/10/06,8210360526
8310130326 Comment* on prnposed .tape of Phase 111 of SEP as reflected
in individual topic definition* appended to B30909 ] tr
Staff encouraged to develop t, implement mean*, to incorporate
positive attributes of Phase III in licensee/NRC interface
HACICH.R M SEP Owners Group KACICH.R M Northeast Nuclear Cnerj<|
Co (suds of Northeast Utilities! 83/10/07 EIBENHUT, D
Division of Licensing 7pp 15682 179 24X Tiche SO-OOO, OB/10/07,
B210I 30326
B2I01B0196 Forward! "Final Status Rapt in Proparat i on for Chemital
Cleanino of Dresden 1, " Sept 1903
RAUSCH. T J CommonoiBfllth Edison Co B3/10/I2 E1SENHUT.D
Division of Licensing IP 15749 135 24X Ficfi* 50-010. BS/ HI/IP.
B2101B0196
B20 1 !2 C JOIB9 Forusrils public version of Revision A to generating station
BnerijBncu plJn corporate command ctr Emergency Plan
Ifiplementin0 Procedure EOF-3. "Environ/Ernei-jencY
Coordinator " Receipt form end
PrtJOlJSKt.J E Conmonwealth Edison Co 62/09/01 DENTCN. H R
- Nn Detailed Affiliation Owen Ip 15564 133 24X
Fichn 50-000. 92/O9/16. 6209290125
NRC
-0209290225 Public version of Revision 4 to generating station
(ffergsnc,/ Plan corporate command ctr emergency plan
Implement in 9 Procedure EDF-3, "Envi ran/Emergency
Coordinator "
PAJOUSKI.J E . UTEHSRt.L A . FLESSNEFI. S A Commonwealth Edison
Co B3/OB/3I llpp 15564 124 24X Fiche 50-000.82/09/16.
6210130376 Aivi-sei that installation of offsite dose calculation SIJB
program fully operational tracking model t operational
A-model uill be dala.j*iJ until B21231 to enmplete prim*
cociputilr instillation
SWAflTZ.ED Comraonusalth Edison Co 32/10/06 DGHION, M R Office
of Nuclear Reactor Regulation. Director 2pp 156B2 093 24X
Fichs SO-aaO.es/10/06.Q2l0130376
S310E9QQ47 Retejjes public version of revision! to Quad Cities, Zion
it Dresdan emsrgency plsi anreBi 6 revised genrafcui[
station emergncij plan be 1-ephgne dirertopy
PEL TON, J M Division of Rules and Records 02/10^08 Document
Management Branch Ip 15877 313 24K Fichs 50-000,62/10/03.
3210270047
8210290060 Foruiirdi public version of Revision 3 to Quad Cities t Zton
inergentu. plan anncies. Revision S to Dresden tmergincg plan
anriBi. Ravn ion to Byron emergency plan annei 4. revised
jennratina ttation ninargtncij plan telephone directory
MOORE, R D Common wealth Edison Co 83/07/30 DEMTON, H R NRC -
Na D* tilled Affiliation Qiven 5pp 13977314 24 X
Flth* 50-OOO.B2/10/OB.B310290047
8310E95077 Put-He version of Revision 3 to Quad Clkiei t Zion
emergency plan jmneies. Revision 2 to Dresden emerjencu plan
antii L Rcvlcion O to B^ron Bmersencg plan annti
Conmonuealtli Edison Co B2/06/30 103pp 3877319 24X
FUlie 30-000.95/10/05,8210290047
B2102900BB PubUc version gf revised generating station inergency plan
teliphan* dirvctory
CAU.E.D P COAnonuealth Edison Co 82/08/12 43pp 13B7B SIB
24X Fich* 50-000, B2/1O/ OB. 631039004 7
aai02E035a Providei info rt organitatlon I performance of depts
niponlible For r*dlatiaa protection activl til*, p er 830702
commitment Training coordinator anignid in Apr 1903 to
Improve health phytlci training programs
TflAHU, T R Comrnanwtalth Eriison Co 82/10/14 DENTOH, H R Office
at Muclear Reactor R*gvl*lion, Dinctor 9pp 15776 2B7 24 V
Fiche SO-000, B=/10/14.9210a2035B
8SlOBS6l70 Aitvitti that plant t pr>p*redne> far offtte protection
near feclUtu. e4eo,uate t will fee applied in event of
radiological iarjencif IL Btite t local plant approved tubj
to verification of jdi^mcy of alerting & notification njj
THOMAS. L, M Faderal Erjticif Hanaaenent Agencg B2/10/14
&lftCKS. M J Office of tn Eietutiv* Director for Operations It
tS7Bq:aSS 94X Flche 50-010,aa/IO/M. B2102S0170
B2101BOI9 1 ? "Final Status Rept in Preparation for Chemical Cte.imng
Dresden 1." Sept 1901 Aperture cards avjilatile in PPFi
. Dow Chemical Co DNB-D1-034 Bl/09/30 SBSpp 15719 ltd
24X Fiche 50-010. B2/1O/ 12, B2101BO196
Inspection reports. IE Bulletins t/ correspondence
S210060329 Foruards IE Insp Repts 50-010/B2-02. 50-237/02-03 t
50-249/B2-O3 on 830119-0^18 Wo noncnmp 1 lane e noted
LITTLE, W S Division of Engineering t Technical Programs OH/07/2
REED, C Commonwealth Edison Co 2pp 15615 331 2<1X
Fiche 50-010,82/09/22,8210060329
B210060335 IE lusp Kepts 30-010/82-02. 50-217/B2-OD d 90-249/03-01 o
820119-02IB Na noncomp 1 lance noted Major areas inspected
open (. unreiolved items i items of noncomp 1 lance ru
integrated leal rate test
REIMAHM.F W Region 3, Office of Director JrtCKIH, I N Divliio
of Engineering t. Technical Programs 32/07/21 7pp ES&lit 'J1,t
24X F^c^B 50-010. 82/09/22, B3I0060329
B210150523 Poruards IE Insp Repts BO-OIO/R2-1 3, SO-237/B3-I7 J
30-249/82-1B on 820700-0909 tt notice of violation
STREETER.JF Dlviiion of Project fc Oesirfent Programs B2/OW2H
REED.C Commonwealth Edllon Co 2pp 13713 099 24K
Fiche 80-010, 82/09/2B. B21OI50S23
B210I50530 Notice of violation from insf on 82070E3-OQ09
STREETEft.J F Division of Project & Resident Programs
Ip 15713 101 24X Fiche 50-010. B2/09/2B. 8310150933
B3101S0538 IE Imp Repts 50-010/83-13,50-237/63-17 t. 90-249/82-1(1 01
62070B-OB09 Noncorap 1 lance noted failure to IISUB (, perform
air pressure test procedure
TON-SUE.! M , JOflDrtN.M J . WALKER, R Division of Project It
Resident Programs BS/O9/2B Bpp 15713 1O2 24X
Fiche 50-010, B2/09/2B, 92101S0523
8210150539 Foruardi IE Insp Repts 50-010/92-15,50-337/82-19 fc
50-249/B2-20 on BiOB30-0903 No noncompl lance noted
PAPESIELLO.C J Division of Emergency Preparedness t Operational
Support 8S/10/OI REED.C, Commonuealth Edijon Co Bpp
15714 179 24X Fiche 50-010,82/10/01,8210150339
B210150543 IE Insp Hepts 50-010/82-15, 50-237/B2-19- k 30-249/83-80 Di
B30830-0903 1 09 No noncompl i ance notid Major area*
Inspected conf irmalorii measurements programi QC program for
analytical measurements t> environ monitoring program
SCHUMACHER, M C , NICHOLSON, H A . JANU6KA, A fi Division of
Emergency Preparedness d Operational Support 82/09/30 7po
15714 177 24X Fiche 50-010, B2/1O/01 ,B31O150S39
820B190233 IE Info Notice 80-38, Suppl 1, "Leaking S, 01. lodged 1-123
Implant Seeds " Svc lilt encl
SSiiiftl DI * UU " ;*/<! FHlti. Materials * aaf.gu*rd
2?i 2i ^ . Con lll " lat '"i EiHion Co of Neu York 6ipp 157A1 290
H4X Fiehe 50-000,02/10/06.8206190233 fV
DOCKETED ITEMS
S20SI9023B IE Bulletin B3-Q3. "Stress Corrosion Grading in Thick-
Ual 1. Large-Diametiir, Stainless Steel p Rec Ircu lation Eys
Piping at DWH Plants " Svc list end
OEYQUNG,R C Director's Office. Office of Inspection and
Enforcement 82/10/14 Consolidated Edison Co of Neui Vorlr
123pp 1SB1O 125 34 X Fiche 50-QOO. B3/10/ 14. 8200190230
R Periodic operating reports t related corre spondenc
B3I018Q077 Forward! monthly operating repts for Sept 1992
SCOTT.D J Commonwealth Edison Co 82/IO/01 Director's
Office of Inspection and Enforcement Ip 15719 001 34 X
Fiche 30-010,62/10/01.8210100077
R Periodic operating reports b related corresppndenc
6310130420 Forwards "Annual Insp of Retired Heitinghouse Testing
Reactor per License TR-2 for 1133 "
NARDIiA J Westlnghouse Electric Corp 62/07/30 Standard llation
J, Special Projects Branch Ip 15690 264 24 X
Fiche 50-032, 82/09/30.8210130430
821013042o "Annual Insp of Retired Us*tinghoue Testing Reactor per
License TR-2 fnr 1903 "
* Weitinghouse Electric Corp 82/09/16 3pp 15650 263 S4X
Fiche 50-OS2, 82/09/30, 821013Q42O
Monthly operating repts for Sept 19B2
SCHRQEDeR.H A Coinnonuea 1 th Edison Co 62/10/O1 23pp
15718 002 24X Fiche 50-01O, B2/1O/QI , 821OI00097
DOCKET 50-27 WASHINGTON STATE UNW RESEARCH REACTOR
Q Intpection reports, IE Bulletins & correspondence
DOCKET 50-13 HADCQCK l> HILCDX CD CRITICAL FACILITY
F Security, medical, energency *t fire protection plans
0210190632 Forwards IE Insp Rept 50-027/02-02 on 830714-16 i 0010
noncomp 1 lane* noted
DOQKiH E Division of Radiological Safety i- Safeguards Program
02/10/01 WILBON.W Washington, l/niv of 3pp 15740 029
Fiche 50-027, S2/10/01,B210l90ci32
3210210194 Forwards IE Safeguards In*P Repts 5O-013/02-O3 t,
70-OB24/82-IO on S2O<!3D-tOOl No noficomp 1 lance noted
G1DSON, A F Division of Engineering & Technical Programs B2/10/I5
ElfGELDER.T C Babcock t Wilco. Co 2pp 13765 304 24X
FichB 50-013.82/10/15,8210210194
--6^10310206 IE Safeguards Insp Repts 30-013/82-O3 b 70-0824/92-10 on
820130-1001 No noncomp 1 lance noted Major areas inspected
physical protection of lou enriched SMI Details withheld
<ref 10CFH2 790)
GGODE.n . MCCU1RE.D I) Division of Engineevina t. Technical
Programs B2/1O/15 Ip IS76S 3O6 SIX FichB 50-013,82/10/19,
S210210194
--8310190636 IE Imp Rept 50-027/Q2-02 on 820714-16 (. 0810 Mo
noncompl lane e noted Major areas Inspected radiation control
programj Inc ludlng posting & libeling. personnel monitoring.
Instrument calibr Si effluent monitoring
GARCIA, E N , HENSLAWSHI.F A, . BOOK. H E Divifl ion of Radio! ogl cal
Safety t> Safeguards Program 82/09/30 6pp 15740 027 24X
Fiche BO-027, 82/10/01, 0210190632
DOCKET 50-29 YANKEE-ROHE NUCLEAR POWER STATION
F Security, madicali emergency d Fire protection plans
P Operating license stage documents !* corrospondonce
aaiPO-10?14 DebaiU evaluation of discrepancy between electronically
simulated reactor d channel periods revealed in calibr test
performed on Log-N-2 channel No unsafe condition eiisted &
n.o Tech Spec violation occurred
OLSE1V.A F Consolidation Coal Co 82/07/27 Standard 1 iat ion &
Spatial Projects Branch 3pp 19583 120 21 X Fiche 9O-013.
02/09/27, 8210040214
Inspection reports, IE Bulletins b correspondence
6210060034 Forward* IE Safeguards Insp Rept 50-029/62-09 on 020803-05
No noniomp 1 ianct noted
HARTf N, T T Division of Engineering * Technical Programs 82/09/27
HEIDER.L H Yankee Atomic Electric Co 2pp 15615 031 24X
Fiche 50-029,83/09/37,8310060034
6210060049 IE Safeguards Insp Rept 50-029/02-09 on 020802-09 No
noncomp I ianct noted Major areai Inspected testing b maint
records, phy steal barriers in protected & vltJl areas &
security syi pouier supply Details withheld tref 10CFH73 21)
DUNLAP,J,H, , SMITH.O C , CODY, A T Diviiian of Engineering t.
Technical Pronrams 82/09/33 Ip 15613 OS3 24X
Fiche 50-027,82/09/9718210060034
aasO2I01<?4 Forunrds IE Safeguards Insp Repta 50-013/B2-03 t
70-OB24/B2-10 on 820730-1001 No noncomp 1 lance notsd,
GIOSON.A F Division of Engineering fr Technical Programs SS/10/19
Ef,'GELDCR,T C Babcock b Uilco. Co 2pp 1576S 304 24X
Fiche 50-013. 92/10/15,0210310194
9210310206 IE Safeguards Insp Repts 50-013/82-03 b 70-0024/82-10 on
&Z0930-I001 No noncomp 1 lane* noted Major areas inspected
physical protection of low enriched SMI Details withheld
(ref IOCFR2 790)
OaODE.fi , HCOUIRE.D R Division of Engineering fc Technical
Programs 83/10/13 Ip 13765306 24X FichB SO-013, 82/ 10/13.
6210210194
8210060306 Act receipt of 020027 1 tr Informing NRC of steps taken to
Inpltment recommendations nnted In IE Emergency Preparedness
Appraisal Rept 30-039/81-20
SMITH,0 H Division of Emergency Preparedness & Operational Support
02/09/29 HEIDER.L H Yankoe Atomic Electric Co Ip 13617 330
24 X Fiche 90-027,82/09/29,8210060306
8210060310 Responds to NRC 830630 Itr re findings noted in IE Em>rency
Preparedness Appraisal Rept SO-029/B1-20 Corrective actions
chemistry personnel placed on ndlo pager sy to afford
earlier notification & response
HEIDER.L H Yankee Atomic Electric Co 02/00/27 HAYNE8, R C
Region 1, Office of Director. &2pp 19619-331 24X
Fiche 80-037, 82/09/39.8210060304
DOCKET 50-20 MASSACHUSETTS INBT OF TECH RES REACTOR
F Security, medical, emergency b fire protection plans
S31Q1'?0334 Forward 5 Revision 27 to SAfi for MIT research reactor,
al-fecting physical security plan SAR withheld
fref 10CFR2 790)
CLARK, L Massachusetts Institute of Technology 82/10/13
TEBEBCO.R L Assistant Director for Licensing Ip 15742 125 24X
Fiche 50-020, 63/10/13, 821O190334
DOCKET 50-23 WESTINOHOUSE TEST REACTOR
Inspection reports, IE Bulletins it correspondence
0210(30420 Forwards "Annual Insp of Retired Uestinghouse Testing
Reactor per License TR-2 for 19B2 "
HARD1.A J Meitinghouse Electric Corp 82/09/30 Standard! ration
V Special Prgjectl Branch Ip 15480 264 24X
Ftch* 50-032, B2/09/30- S210130420
3210130426 "Annual Insp of Retired Uestlnghous* Testing Reactor per
Ufcense TR-2 for 1982 "
4 Westlnghouse Electric Corp 02/07/16 3pp I96BO.S&5, 24X
Fichu 30-022, 82/09/30, 8210130420
8210210943 Forwards Amend 73 to License PPR-3 b notice of issuance
Amend incorporates gurd training I< qualification plan,
in response to licensee 61O610 & 1208 Applications
CRUTCHFIELD, D Operating Reactors Branch 5 82/09/30 KAY, J A
Yankee Atomic Electric Co 3pp 15793 392, 24 X
Fiche' 90-027, 82/07/30,8210210949
6210210952 Amend 73 to License DPR-3, requir inj implementation of nuard
training d qualification plan uiithln 60 days It qualification
of All security personnel ulthin 2 yrs
CRUTCHFIELD, D Operating Reactors Branch 3 83/09/30, Sp p
13782'353 24X Flehe SQ-Q29i 32/09/30, 031 021054S
6210210899 Notice of issuance of Amend 73 to License DPR-3
CRUrCHFIELD,D Operating Reactors Branch 3 82/09/30 2pp,
IS702 338 24X Flchs 30-027,82/07/30,8210210345
6210220133 Ack receipt of 820927 Itr informing NRC of stvps taken to
correct violations noted In IE Safeguards Imp Rept
30-029/82-08.
STAR09TECKI,R. Division of Project & Resident Programs B2/10/IS
HEIDERi L H Yankee Atonic Electric Co Ip 13778.090, 24 X
Fiche 80-029, S2/10/I5, 82102201B3
10
DOCKETED ITEMS
--B2I0220157 Responds to- MRC 030901 1 tr re violation* noted in IE
Safeguards [nip Rept 50-Q29/B2-OH Corrective- action*
wmtifld <ref 10CFFt2 790)
HEIDBt.L H Yankee Atomic Electric CD 62/09/27 HAYNES, n C
Rsjic-n I. Office of Dlrtctnr 2pp 15778 071 24 K
Ficht 30-029, B3/10/1.5.BiJlQ220153
8210210552 Amend 73 to Licenie DPR-3, requir Ing implementation of guard
training Si nualif itation plan within 60 dags Si qualification
at all security personnel uithin 2 yrs
CRUTCHFIELD.D Operating Reactors Branch 3 B2/09/30 5p P
13782 355 24X Flchs 50-029,82/09/30.8210310545
Operating license *tage (ocurasnti ti corres pondenee
10040399 RBO.uets processing of lilted documents re EP Topic
11-04 E. "Darn Integrity, "
SHITH.H Operating Reactors Br:neti S 62/09/17 Division of
Technical Information i Document Control 2pp 15597 226 34 X
FIcKe SO--029, 82/09/17.92100-10399
10040135 Forward-* safety, valuation b tesnnitl evaluation repti of
licensee response to proposed design modi to de-graded grid
voltage Schedule tor response requeited uithin 3O da.ya
CHUTCHFIELD,D Operating Reactors Branch 5 B3/09/27 KAV, J A
Yankee Afcomte Electric. Co 0pp 1 SS83 093 24 X
Fiche 50-029. 83/09/37, 8210040132
B21Q040139 Bafetu, evaluation n degraded grid voltage protection for
Clasi IE iijt Design acceptable subj to resolution of lilted
items
Operating Reactors Brancfi 9 82/09/27 7j p 13533 097 24*
Flche 30-029,62/09/27.62100^0132
-820*200^75 "Proposefl Dign Mods i T*ch Spec Chingei on Qrid Voltage
DBpadat ion tor Van** Rotii Muclear Pouer Station,"
tcchnieal nv*lutton rtpt
SELAN.J C Laurence Llvcrmtire LaborBtorn FIH A- 0250
UCID-19147 92/07/30 tiKC - No Detailed Affiliation fciven
I3pp I55B3 104 24X Fich* 90-O29, 8S/O9/27, 8210040132
210130207 ForuariJ* aafetij evaluation of SEP Topic 1 1 1-4 C r
Internally gentratei) niiiilo Qtnei-ation of Internal
iriinUti within facility mill not prevent life ihutdawn
CARUSO, R Dp* rating Reactor* Branch 5- 82/09/59 KftV, J A Yanl*e
Atomic Electric Co 2Bpp. 15692 135 B4X Ttch* 50-089.32/09/29.
8210120207
Fropaiiit Change 17B to License DPR-3, aid-ing !, deleting
containmRiit Isolation valves, speciifijinQ iquipment
paramtars. ad ding neu equipment d rec ateg-ar li Ing valvti to
ace omniodate mod Imp lementatian during refueling outage
HE10ER.L H Vanh< Atomic Elaccric Co 62/09/30 Of fie ( of
Nuclear Reactor Rffjulatio-ni Director 9pp 15640 244 24*.
Fich 50-OB?. e2/O9/30,8S10Q8009S
B2100B0103 Pr D jioEed Tcti Spec pageii aidri ln,gi & deleting containment
isolation Va Ives. ap-ee 1 f uing *qulpment pramfrtr . adding neu
sqjiprasril b recategorli ing valv^i to acconmodate nod
implementation! during refvtling outaa&
* Yanie-e Atorntc Electric Co 62/09/30 22>P- 1S&40 253 21X
Flctis 50-029,92/09/30. B2IOOB009B
8310120341 Forujtrd* *aFty evaluation k technical evaluation repts of
SEP Toplc II -3, fl. 1 1-3 fli II-3 B 1 & I 1-3 C r hydrolooic
coni<itr*tioni Facility rfoti not meet MRC c^lte^ia
Deviation* will be resolved in integrated tafetij aneiiment.
CARUSB,fl aper*tlng Reictan Branch 9 B2/09/3Q BAY, J, A, Yanbuv
Atonic Electric Co, 3!pp 19691 001 24X Fich* 50-029. 88/09/30,
B210 120245
B209 100369 "Hydrologlca 1 Cam id aratloni (SEP. 1 1-3 A. E, Q l.CllII-3Q),
technical evaluation rtpt
SHEHRERiJ Franklin Initituti/Franli lin Reiiarch Center.
HRC-03-79-11B TBR-C5257-42i 92/08/06 STALED NfiC - No
Retailed Affiliation Given Blpp. 19651:032 24X
" 139, 32/09/30, B21012024S
8210210553 Wotice of usuance of Amend 73 to Licente DPR-3
C-RUTCHFIELD, D Operating Reactors Branch 5 82/09/30 2p p
15782 35-8 24X Flche 30-029, 92/O9/30. BSl 0210545
B210O70169 Forwards topic difference summary for GEP Topic II1-6,
"Eelimlc Design Considerations" ft updated diffeience
sum-naries for Topics V-10 B,V-11 U.VII-3(- 1X-3 re RHR BU.U
k iijs required for safe shutdown
CARUSO. R Operating Reactors Branch 5 82/10/01 KAY, J A Yankee
Atomic Elqctnc Co 7pp 15627 001 34X Ficlie 50-029. B2/1Q/O1 ,
B2L0070U9
6210070035 Forwards draft safety evaluations of SEP Topio III-& re
ieijmic design considerations & SEP 111-11 re component
integrity Ltcenix proposal re dedicated hot shutdown sys
will be evaluated during integrated assessment of facility
CARUSO.R Operating Reactors Branch 5 82/10/04 KAY, J A Yankee-
Atomic Electric Co 20pp I562B 331 24X Flche SO- 039. S2/ 1 0/04,
B2100700BS
B2 1007007 1 "Seismic Design Bases & Criteria for Yankee Roue
Generating Station SEP "
* Engineering Decision Analysis Company, Inc EDAC 173-130 03
DRF 79/01/31 39pp 15628 351 24X Flche 50-039,82/10/04,
B21007Q085
B210070074 "SEP. Review of Seismic Re-evaluation Program of Yan*ee
Nuclear Pouer Station "
. NHC - No Detailed Affiliation Given 92/0?/30 B3pp
15629 018 24X Fiche 30-029, B2/10/04. 8510070085
9210070099 "TecKnical Evaluation of Yankee Roue Power Station BiUmit
Qiil$n, " Aug 1983
HHIDOES.T L , BUSCH,3 I , THOMPSaN, T R EQJ.Q, Inc FIN A-&12A
EOO-EA-6017 62/08/31 CIIENO. T Division of Licensing 3t>'Jff
15629 100 24X Flche 50-029, 82/10/04, 6310070083
8210)30326 Comments an proposed scope of Phase III of SEP as rcFlected
in individual topic definition! appended to 820909 Itr
Staff eneouragid to develop t> implement means to incorporate
poiltive attributes of Phase III in 1 Iceneec/NRC interface
KnCICHiR H SEP Owners Oruup KACICH.R H Northeast Nuclear Cnr g u
Co (subi of Northeast Utilities} 63/10/07 CISENHUT, D
Diviilon of Licensing 7pp 15682 179 24X Flche 50-000, 92/ 1Q/OV,
8510130326
8210130401 Concurs u/content of systematic aEtessment of licensee
performance board recommendations, per NRC B20903 Itr
Licensee action on primary vent stack monitor failui-es
should be clarified to show thorough evaluation of LEfts
KAY.J Yankee Atomic Electric Co B2/10/OB STAROSTeCKl , R
Division of Project & Resident Programs 2pp 15682 070 S4X
Flche SO-029. B2/10/OB, B31013040I
8210150363 Responds to Generic Ltr 82-12 re plant working hours Plant
policy re uoi-Hng houn should not be Incorporated Into
Tch Specs due to IDS* of flexibility
KAY.J A YanVee Atomic Electric Co B2/10/OB E1SENHUT,D Q
Division of Licensing 2pp 15704 305 24X Fiche 90-059. B3/ 10/00,
0210130343
82101BOIB7 Clarifies B20B04 request for oddl Info re NUnEO-0737.
Item II B 3, "Post-Accident Sampling Sij " Guidance on
meeting tiUREQ-0737 crit*rla dlscusied
CRUTCHPIELDiO Operating Reactor! Branch 3 H2/10/OB KAYi -J A
Yantee Atomic Electric Co 3pp 13719,130 24X
Fiche 30-029, B2/IO/OB, B3I0160187
B2I02101S3 Foruards .valuation of SEP Topic I1I-3 A, "Effect* of High
Water Level on Structures," band on 82031B BAR Turbine J,
ive bltfgsiscreenuall & pumphous* unprotected from postulated
flood condition
CARUBQ.R Ojieriting Reactors Branch 5 B2/10/13 KAY, J A Vank*
Atomic Electric Co, 7pp 1S766 027 24X Fiche 30-029,82/10/13,
8210210123
B2101906B6 Application to amend License DPR-3, replacing 40 fuel
aiiamblies to refuel fnr Core XVI operation fc iniecting
Cfjclt dependent piramatert in Tech Sped
HEIDER.L H Yankee Atomic Electric Co B2/10/15 Office at
Nuclear Reactor Regulation. Qirector Sop 1373B 163 24X
Flchi 50-089,82/10/15,8210190696
8810190690 Proposed T.ch Spec; no d inserting cucl. dependent p.rie
Yankee Atomic Electric Co 82/10/18 2Spp, 1373B 1A7 B*X
Fiche 30-029,82/10/13,8210190686, P
DOCKETED ITEMS
a3lOB0094 Application to amend App A of License DPR-3, c nns i sti rig of
Proposed Change I 79, a 1 lowing increase in plant operating
flexibility while maintaining sufficient RHR Fioui to ensure
reactor vssl tatter temp does not exceed 140 F in Mode 6
HEIDER.L H Yankee Atomic Electric Co 83/10/15 Office OF
Nuclear Reactor Regulation, Director 2pp 13B37 IBS 24X
Fiche 50-039.82/10/15.8310200094
H2I013O4O1 Concur* til/content of sijstema 1 1 c assessment of licensee
performance board recommendations, per NRC 820903 Itr
Licensee action on primary vent stack monitor failures
should be clarified to show thorough evaluation of LEfis
KAY.J Yankee Atomic Electric Co 82/10/O8 STAROSTECKI. R
Division of Project f, Resident Programs 2pp 15602 070 24X
Fiche 50-029,82/10/08,8210130401
8210260103 Pi oposed Tech Spec Change 179, allowing increase in plant
operating flenbllity while maintaining sufficient RHR flow
to ensure reactor vessel water temp does not eiceed 1 4O F in
Mode &
* Yankee Atomic Electric Co 62/10/15 4pp 15937 1S7 24X
Fiche 50-039,82/10/15,6210200091
Q Inspection reports, IE Bulletins tc c orresp undone e
3310070007 Responds to FQ1A request for eight categories of records re
steam generators b steam turbines App A documents provided
in R Udell Ft) I A Request 81-313 Forwards documents listed In
App D
FELTGN, J H Division of Rules and Hecords 02/OS/IO LONG, D J
Winthrop. Stimion, Putnam t, Roberts 9pp 15615 063 24X
Fiche 50-000, 0a/OB/ IO, B2IQO7OOO7
B21007Q139 Forwards tabulated data on steam generator insp & maint at
facilities Data should be provided to licensees
IPPOLITO, T Operating Reactors Assessment Branch B2/04/0 1
VAROA. B Operating Reactors Branch 1 CLARK. R Operating
Reactors Branch 3 STQLZ,J Operating Reactors Branch 4 5pp
15615 131 24X Tiche 50-QQO, B2/OB/ 10, 831 OO70007
8310070172 Forwards info re steam generator integrity & Insps at all
operating PHfta.per 75032O ic 31 requests Details of insps,
including defect ind tea ti ons. tube plugging criteria & tubes
plugged ui 1 1 not bo provided eicept for Point Beach 1
GOLLER.KR Division of Reactor Licensing (NHR-1973 only)
75/03/24 MACCARY.H f Division of Technical HOVIBUI (NRR-1975
onlu) 5pp 15645 I9fc 24X Fiche 50-000,02/08/10,0210070007
3210060034 Forwards IE Safeguards Insp Rept SO-029/B2-09 nn 820002-05
No noncomp 1 lance noted
MARTIN. T T Division of Engineering t. Technical Programs 02/09/37
HEIDEH.L H Yankee Atomic Electric Co 2pp IS615 031 21X
Fiche 30-039.92/09/27,0210060031
--3310060049 IE Safeguards Insp Rept 30-029/02-09 on 020B02-03 No
noncomp I lanes noted Major areas Inspected testing b maint
records. phy slcal barriers in protected & vita! areas 4
security sus power supply Detail* withhold {ref 10CFR73 SI)
DIM.AP.J M , SMITH. C . GODY. A T Division of Engineering fc
Technical Programs 82/09/83 Ip ISA! 5 033 24X
Fiche 30-029. 03/09/27. 02IOQAOQ34
0310060306 Act receipt of 820027 Itr Informing NHC of steps taken to
implement rec ommendationi noted in IE Emergency Preparedness
Appraisal Rep i 50-029/81-20
SHITH.O H Division of Emergency Preparedness & Operational Support
82/09/39 HEIDER.L H Yantee Atomic Electric Co Ip 15619 330
24X Fiche 5O-029, 82/09/29. B310060306
-- B210060310 Reipondi to NRC B2Q630 Itr re findings noted in IE Emergency
Preparedness Appraisal Rept 30-029/81-30 Corrective actions
chemistry personnel placed on radio pager ys to afford
earlier notification & response
HEIDER.L H Yankee Atomic Electric Co B2 /OS/27 HAYNEB, R C
Region 1. Office of Director 62pp 19619 231 24 X
Fiche 50-029. B2/09/29, 0210060306
6210290147 Forwards IE Insp Rept SQ-029/B2-10 on S20B03-0930 No
noncomp 1 lance noted
5TAHD5TECKI,R Division of Project Si Resident Programs B2/1O/O0
HEIDER.L H Yankee Atomic Electric Co 2p p 13051 214 24X
Fiche 50-029. 82/10/08. B31O290147
0210290157 IE Insp Rept 50-029/02-10 on S20802-0903 No noncamp 1 lance
noted Major areas inspected review of plant operation, p lant
maint obser vat ion, p lant events, LERs . 1 icensee plant info
rept, per iod ic b special repti & preparation For refueling
COLLINS, S J , OALLO.R M Division of Project ! Resident Prooraws
82/10/07 16pP 15S54 216 24X Fiche 50-029, B2/10/OB, 021 039O147
820B190338 IE Bulletin S2-03, "Stress Corrosion Cracking in Thick-
Mal 1. Large-Di ameter. Stainless Steel, Recircu lation Sys
Piping at BUR Plants " Svc list end
DEYOUNO.R C Director's Office. Office of Inspection and
Enforcement SE/10/14 Consolidated Edison Co of New York
lISpp 15010 123 24X Fiche 50-000, BB/10/ 14, 920S190238
8210220153 Ac I receipt of S20927 Itr informing NRC of steps taken to
correct violation* noted in IE Safeguards Insp Rept
SO-029/02-OB
5TAROSTECKI,R Division of Project & Resident Programs B2/1O/1S
HEIDER.L H Yanltee Atomic Electric Co Ip 13778 090 24X
Fiche 50-029,82/10/15.8310220153
8210220137 Responds to NRC 020901 Itr re violations noted in IE
Safeguards Insp Rapt 50-029/03-OB Corrective actions
withheld (ref 10CFR2 790)
HEIDER.L H Vankee Atomic Electric Co 83/09/27 HAYNE8, R C
Region 1, Office of Director 2pp 1577B 091 24X
Fiche 50-029. 0S/10/15, B210230I53
3 Reportflblo occurrences, LERs & related correspondence
8310010000 Responds to FOIA request for 19 categories of documents re
nuclear reactor events & safety problems Forward documents
listed in App A
FEU TON. J M Division of Rules and Records 82/06/28 UDELL, R A
Critical Mass Energy Project ISpp 13727 003 24X
Fiche 90-000.82/06/29,8210010000
8109280175 Requests addl Info re Ion of offsite power event on 910914,
SAND3.S P Director's Office SI/07/18 CARUSD.fi Operation
Reactors Branch 3 Ip 13730 230 24X Ftthe 30-000,32/06/28,
8210010008
8210010161 Discusses potential problem re sequoyah reactor pressure
naiz le, mpp lifflBnt ing 000332 memo Underctad cracfcs found by
us* of ultrasonic equipment Addl items of recent origin
discussed Related info end
DENTON.H R Office of Nucler Reactor Regulation, Director
BO/02/S8 AHEARNE, J Convni s i oner s 9p p 1 5727 1 78 24 X
Fiche 30-000,03/06/26,8210010008
8210130230 Forwards LER B2-03S/03L-0
AUriO.H.A Yankee Atomic Electric Co B2/09/30 HAYNES, R C
Rigion 1. Officl of Director Ip 13675 2&9 24X
Ficht 30-029,82/09/30,8210130330
B2I01SO272 Forwards evaluation of utll response to SEP Topic II 1-3 C,
"Inservlce Insp of Water Control Structures " Present imp
program does not conform u/Reg Guide 1 127 t should be
modified to Incorporate NRC recommendations
CARUSO, R Operating Reactor* Branch 5 Q2/1O/04 KAY. J A Yankee
Atomic Electric Co lOpp IS65I 190 24X Fiche 50-029, 82/1 0/01,
0310I30272
-8210130235 LER Q2-023/03L-0 on B20931,gas leak developed in weld
joining safety valve drain line to valve body on unite gas
decay 2 drum safety valve Cause not stated Leaking uield
Isolated, ground out & reuielded
RICE.DA Yanfcc* Atomic Elaetric Co 82/09/30 Region 1,
Office of Director Ip 13675 370 24X Fiche 50-029.82/09/30,
8210130230
~-9207190431 "Hydrolog i ca 1 Cons i derail ons, Ins ervice Imp of Mater Control
Structures (SEP III-3 O.Yantee fiou/e Nuclear Power Station,"
technical evaluation rept
SCHERRER.J Franklin Institute/Franklin Research Center
MHC-03-79-1 19 TER-C5257-544 S2/07/15 BTALEY, NRC -No
Detailed Affiliation Owen 39pp IS&S1 200 34X
Fiche 30-029,82/10/04.8310120272
82Q81V0233 IE Info Notice 80-35, Suppl 1, "Laaking It Dislodged 1-125
Implant Seeds " Svc list end
COBB.L I Division of Fuel Facilities, Materials h Saf toward
83/10/06 Consolidated Editon Co of Neu York &6pp 13741 950
21 X Fiche 90-000,02/10/06,8200190233
8210130218 Forwards LER 82-037/03L-0
AUTIO.H A Yankee Atomic Electric Co 82/10/01 HAYNEB.R C
Rlglon 1, Office of Director Ip 15673 239 24X
Ficht 30-029,82/10/01,8210130818
8210130223 LEft 82-027/03L-0 on 02090Si uhile In Mode 1, auxiliary boiler
room sprinkler \l Isolated to stop i repair gasket leak
Cauiad by i niuf flcient gasket contact w/valve TS-V-739
Oasket replaced,
MAY, E L Yank*e Atomic Electric Co 82/10/01 Region 1. DfPics
of Director Ip 13679 236, S4X Fiche 30-029,83/10/01.
B21013021B
12
DOCKETED ITEMS
3510130519 Forward! LER 82-026/03L-0
AUriO.H A Vantee Atonic Electric Co 82/10/01 HAYNEB.R C
R.jion 1, Cfflct of Director lp 1 5662 361 34*
fit.hr 50-029, 62/10/01, 8210130315
-B210133331 LER S2-036/03L-0 on 020902. whi le performing turvii 1 lanct of
lou nin ooUnl flou lyt train A, loop 3, ptiaie C rlV
f*iltd to drop out uhen de-enerjued Caused bg abnorn"!
amount of friction bttuten pjungtr 4 ufftr buihing
FHENCH.L D Yanlee Atonic Electric Co 82/10/01 Region 1.
Office at Director lp IS6B2 342 24X Fich< SO-029. 63/10/01,
B21 013051 9
DOCKET 50-62 UNIV Or VIRGINIA RESEARCH REACTOR
E NRC Safety Evaluation Report (SER), suppls & correspondence
9210050377 SAFETY EVALUATION REPORT RELATED TO THE RENEWAL OF THE
OPERATING LICENSE FOR THE UNIVERSITY OF VIRGINIA OPEN-POOL
RESEARCH REACTOR Docket No SO-O63
Division at Licensing NUREG-0928 92/09/30 77pp Available
at NRC *5 00 13626 030 24X Fiche 50-062,92/09/30,6^10050377
P Op I rating license stage documents ( correspondence
I2I0260I0 1 ? LER B2-032/01T on 621006. poi itive Indication observed during
shipping of second Cycle full aisembl". 0-37S AnjlSiiJ ihoul
atiembly causdJ ilight intreati in reactor coolant activity
tfurlna tors 15 operation
AuTIQ.H A Vanl.e Atonic Electric Co B2/IO/07 KAYNES. R C
Bigion 1, Offic, of Director lp 1 5799 1 16 24X
Fiche 50-029,02/10/07,821026010''
Q3100600B6 Inforrat of minor mods made to ECC5 piping Flaiibli piping
installed on tank nrfe of remote coupling to provide
necenari; meviment for coupling alignment Repair uill have
no advene (Ffect on ability of ECCS to perform
BRENIZER, JS Virginia, Unw of B2/09/37 Btandanfi id t idn !,
Special Projecti Branch 6pp 13615 033 24X Fiche 50-Oi2,
8a/ 09/27, B21 0060096
2-1M90267 Part 21 dficiencu rept re potintial galling problem betuean
itrm (. bonne-t of 1 25-inch t larger A105 carbon iteel &
A192-F32 v*lvn lupflitd F*b 1701-Aug 1983 V*lvei ihould be
lltllctd t itltn */Qr bonnet replaced
I9ABELLE.L D Conval- Inc 03/10/11 HAVNES, R C B>gion I, Office
of Director I7pp 15954 333 24X Fithe 90-000,33/10/11.
B2 10290367
JJ0260106 RO 5O-29/82-33 on B31009, "tiiln conlant pump 1 v>nt isolation
valve uild diicavered ilfgntlij malit Meld will b( ripalred
during current refueling outjjff
AUTIO.H A Yankee Atonic Electric Co B2/IO/12 HAYNE9, fl C
Reoion I. Office of Director lp 15799 1 1 9 24K
Fieht 50-029. 82/10/12,8210260106
'I026016S Foruurdi LER 82-029/03L-0
AUriO.H A Vankte Atonic Elnctrlt Co 92/10/13 HAYNE8, R C
Region 1, Office of Director lp 1579? 001 24 X
Fichi 50-029,82/10/13.8210260163
B210260169 LER B2-039/03L-Q on 620913, dur Ing refuillng outage in Mode 5
ubile perforining callbr of itean generator narrow-range
Itvtl trip lyi. trip iitpolnt 3 found less than Tech Bpec
Unit Cauted bu ntpoint rfnft
FfiENCH, L D Vante* Atomic Electric Co B2/10/13 Region 1>
Offic* of Director lp 1 57<59 002 24X Ficht 30-029.83/10/13,
S3 10240165
[02&O4SB LER B2-039/01T on BS1013, realtor protection iiji permissive
}Jita61>i B/S 4BO & B/S 433 found calibr out of tolerance
'auied bij lurveillance procedure inadequacy Bistable*
ee'Hbr
(UJIO.H A Yankee Atomic electric Co 82/10/13 HAYNEB, R C
legion I, Office of n( Pector , i p 15BO& 393 24X
iche SO-0
OSSOOBS LER BE- 032 na* been canceled
iLirlO, H A Yantee Atomic El*ctrlc Co B3S 1O/20 HAVNE3, R C
'3 ion I, Of Fie, of Director lp 15637 183 34 X
lent 90-029.82/10/20.6210280035
KET 50-54 UNION CARBIDE RESEARCH REACTOR
Operating llc*nte itaga documents b correspondence
0130302 Foriurli figure* inadvertantl v anttted from GO 0323
pplication For rtneual of Llcinie R-at t addl minor
hangis to Tech B>ec*
OTW.H H Union Carbide Corp B2/O9/29 BEflNAflD.H
tandardiiation l> Special Project* Branch ISpp 1S670 313
icht 50-054, B3/0'9/29,Bai013O302
210130306 Propniid Tech Spec changei re furled elplrimenti k
i taffingi supplementing 800333 application to renew Licenie
fl-Bi
Union Carbide Corp B2S09/29 Spp 15670 333 24 )(
Fiche: SO-OS4. 82/09/29. B21 01 30302
KET SO-57 STATE UNIV OF HEM YORK RESEARCH REACTOR
Security* medical, emergency t fire protection plani
OO10377 Forudrd* Rtviilon 4 to ncuritg pln Revision withheld
rtf 10CFR2, 790)
EHRViL.e Nu York. 8tatUnlv of, Buffalo BR/09/17 THOMAS, C
tndar4iritjn b Spvcial Projtcti Branch, lp 13573 191 24 X
ltd*' 90-097, 82/09/17.9210010877
B2IOOB0237 Foruardi licensee 83092 Hr to ORNL requesting shipment of
DOE-ouined MTR tupe reactor fuel using HFIR spent fuel
ihippinj ca*l
DEHNECHE.P E Virginia. Univ of 62/09/30 CARTER./) E
Standarifi lation b Special Projects Branch 3pp 1S63H 07fl ,*4X
Fiche 50-062,82/09/30,8310080237
8210120475 Foruardi Amend 15 to Licenie R-i6. CIA t> notice of usuant*/
negative declaration Amend reneui DL for 20 ijr>
THOMAS. C Standardnation t- Special Projects Branch 82/0 9 /JO
BREN1IER. J S Virginia. Univ of 2pp 15672 005 24X
FUh> 50-063,82/09/30,8210120473
B2101204BO Amend 15 to License R-66, renewing OL For SO qrs
THOMA8.C Standardliation t. Special Projects Branch 32/09/:iO
34pp 15672007 24X Fiche 50-062,82/09/30.8210120475
-B2101204B7 CIA supporting Amend 15 to License R-66
Standardliation t. Special Projects Branch 02/O9/30
15672 042 24X Fiche 50-06S, H2/09/30, 021 0120475
3pp
B210IS0492 Notice of renewal of facility OL !< negative declaration
re Amend 15 to Llceni* R-66
THOMAS.C StandardJidtion i Special Projects Branch 02/09/30
2pp 15672 049 24X Fiche 50-062, Q2/09/30, 021012O475
B2101HOOI4 Sobnlti daily highlight for B20930 NBfl Isgued 30-yr
reneual of License R-66
CARTER<R E Standard! lation b Special Project* Branch 82/10/01
CASE.E . CARTER.J Office of Nuclear Reactor Regulation. DlncUr
EISENHUT, D Division of Licensing lp 13717 352 24X
Fiche SO-062, B2/10/01, 8210180014
DOCKET 50-70 GENERAL ELECTRIC TEST REACTOR
C Adjudicator^ correipondence
6210200087 Notici at ASLB reconst itution JH Frye. cha irman & H For*mar,
t CA Llnenberger. members
COTTER. fl P Atomic Safety and Liceniing Board Panel B2/IO/H
Sff 15753 196 24X Fiche 30-070,82/10/14,6210300087
82102203*3 Memorandum t order directing OE to file rept on intention to
tubnlt applicatloni to renew OL !, SHM Uc*n se, uith in 15 days
of ivc of order
FRYE.J H Atomic Safety and Liceniing Board Panel 82/10/31
Oeneral Electric Co 3pp 15776 263 34X Fiche 30-070,82/10/21.
8210220343
P Operating license stage documenti 4 correspondence
B2102S0110 Application to amend Licenie TR-1, reo,uei tins addl Tich Bpti
change) reflecting reovl of irradiated BNM bu eliminating
tests re reactor bldg integrity
CUHNINOHAM.O E General Electric Co 82/10/12 TEDESCO.R L
Aislstant Director for Liceniino 2po 15767 02S S4X
Fiche 50-070,62/10/12.0210250110
" 8S i?f 5 ? U3 , Propo " (l Tich fi P Be el**"!*' reflecting removal of irradiate
HW by elininating tuts re rctor bldg intejritu
General Electric Co 82/10/12 3pp, 15707 030 S4X
Fiche 30-070, BS/10/12, 0210230110
DOCKETED ITEMS
13
DOCKET 50-72 UNIV OF UTAH RESEARCH REACTOR
At* receipt of 020924 Itr Forwarding revised annual
operating rapt for 1981
SE1DL,W C Division of Resident. Reactor Project & Engineering
Program B2/10/22 JAC.ODB.H R Utah. Univ of Jp 15799 156
?4X Fiche 90-072, B3/10/22, 8210360224
R Periodic operating reports & related correspondence
82 102501 92 Forwards third quarterly status rept re plant opera 1 1 nnal
status d util activities, per H3O216 order Study re future
deposition of plant uill be completed within & months of
issuance of NRC final reactor safety pulley itaternent
QHLBACH.R , CRANE,f> A LOCKE. R f Pacific Gas S. Electric Co
BS/ 10/01 LA70p R rf . 9CHINK, B R . LINENBERflER, O Atomic Safety and
Licensing Board Panel 3pp 1 57B7 336 24X Fiche 50-133.02/10/01,
B21 0290192
-8310260230 Forwards revised "Annual Operating Kept, 1981 "
JACOHS,H R Utah, Uni, of 92/09/24 MADSEN. G L Region 4,
Office of Director lp 1S799 157 34X Ficha 50-073,03/10/33,
BSl 0240224
-B210260334 Revised "Annual Operating Rept, 1981 "
5AND3UIST.G M Utah. Unw of 93/O9/34 3pp
Fiche 50-073,02/10/33.0210240224
DOCKET 50-93 UNIV DF FLORIDA TRAINING REACTOR
d Inspection reports. IE Bulletins & correspondence
9210010120 Forwards IE Insp Rept 5O-OB3/B2-02 on 020811-13 NO
noricomp 1 lance noted
VERRELLI.fl ff Division of Project t- Resident Programs 92/09/31
-JACOBS, AM Florida, Univ of, Gainesville 2pp 1S566Q32 34 X
Fiche SO-O8J. 82/OB/31, 8210010120
--6310010122 IE Insp Hept 50-OQ3/92-0? on B20811-13 No noncomp 1 lance
noted Major areas inspected radiation protection
PEERV.W W . BARfl.K P Division of Engineering i Technical
Programs S3/08/30 3pp 19566 034 24X Fiche SO-OB3, B2/OB/3I ,
B2100I0120
DOCKET 50-133 HUMBOLDT Qrt V POUEfi PLANT, UNIT 3
F Security, medical, emergency (. fire protection plans
R21Q01019B Forward* safeguards iffo re changes Implemented IP security
plan Info withheld <ref 10CFR73 21 J
CWflNE.P A Pacific Qas t. Electric Co B2/07/33 DENTON, H R
Office of Nuclear Reactor Regulation, Director lp 15968 077 31)
Fiche 50-133, S2/09/33, 831O010J9H
fl Adjudicatory correspondence
221006018'? Ordur etending time until B2I013 for Commission to act to
review Director's Decision OD-B3-7
CHILK.S J Office of the Secretary nf the Commission 83/10/04
Conmisiioners lp 15613238 34X Fiche 50-133,62/10/04,
821G0601B9
8210250196 Third quartarly status rep t for facility Certificate of Sv
one 1
LOCKE, R F Pacific Saa fc Electric Co B2/1O/O1 4pp 137H7 330
24X Fiche 50-133,82/10/01,9210350193
DOCKET 50-143 UCLA TRAINING REACTOR
F Security, medical, emergency & fire protection plant
02102900S3 Partial response to F01A request for documents re UCLA Lao
tr research reactors Forwards documents Hated in App A
FELTON, J M Division of Rules and Records S2/0'7/O3 HIK3CH. D
Government Ac countao 1 1 1 ty Project 2pp 1 5B64 195 24X
Flche 50-142,82/09/03,9210290023
B210390O36 Requests that licensee submit neu physical security plan
to comply u/neui regulations to lOCFRSO. 70 b 73 bg 740 J 07
8KOVHOLT, D J Atomic Energy Commission, Directorate of Lie arising
73/11/30 HICKS, T E California, State of lp 15B64 259 24K
Fieri* 30-142,02/09/03.5210390023
BSI0290043 FBI-ward* addl info re physical security plan Info withheld
(i-ef 10CFR2 7901
ASHBAUGH, C E California, Univ of, Los Angelas 74/11/27
COLLER. K R Atomic Energy Commission, Directorate of Licensing
Ip I3B64 360 24X Fiche 30-142, B2/09/03, SaiO29Q023
8210390051 Forwards SNM Inventory Info for nonpciuor reactor Facilities
Info withheld (ref 10CFF12 790 Author! lat ion to retain,
Inventory requested
ABHuAUOH.C E California, Univ at, Lot Angelas 76/01/30
OOLLEfl.K R Division of Operatinrj Reactors 3pp 15864 343 S4X
Fiche 30-143,82/09/03,9210390023
8101300333 Notifies that unce reactor operating fe S.VM storage, sites
jra contiguous. facl 11 ty must Implemant interim Category I
physical securitv requirements Compliance plan required by
810131
MILLER, J R Standardl lation fc Spacial Project* Dranch fll/OI/13
WEOST.W F California. Univ of, Los Angeles lp 15865 093
2-JX Fiche 50-H2.82/09/03.B21Q390033
Adjudicatoi-y correspondence
B3E0150193 Advises that Commiision declined review of Director's
Decision DD-82-7 Time for Commission to act epired Decision
became final agency action an B21012
CHILK.S J Office of the Secretary of the Commission 82/10/13
GUEMTHER, H Affiliation Unknoun lp 13707 339 24X
FicM 50-133,92/10/13.8210150193
P Operating license stage documents t< corres pondencB
Q21O2iO359 Responds to oenoric Ltr B2-12, "Policy on Factor* Cauflina
Fatisue of Operating Personnel at Nuclear Reactors "
Eiistlng procedures comply u/pollcy statement
CflANE,P A Pacific Oa fc Elctric Co B3/IO/21 rURAQLIA,F J
Licensinfl Branch 3 lp 15804 3SB S4H Fiche 30-133, 02/10/31,
82 1 0260359
Q Inspection reports, IE Bulletins & correspondence
B20B170233 IE Info Notice 80-35, Suppl 1, "Leaking (, Dislodged 1-125
Implant Seeds " Sve list enel
COPB. L I Division of Fuel FaciHtlis, Materials b Safiguardi
S3/1O/06 Consolidated Editor, Co of NBUI York &&pp 13761 SSO
24X Fiche 50-OOOr 02/10/06, 8300190233
0203190239 IE Bulletin 82-03, "Stres* Corrosion Craikino in Thick-
Hal 1, Large-Diameter, Stainless Btflel , Rec ircu latlon Sys
Piping at DWR Plants " Bvc list encl
DEVDUNO.R C Director's Office, Office of Inspection and
Enforcement 02/10/14 Consolidated Edison Co of Neu York
MSpp 15810 1S5 24X Fiche 50-000,82/10/14,0308190238
6210QB0077 Response supporting Committee to Bridge the Qp 030930
nation for summary dismissal of NRC Si util 020901 % 03
motions for ummary disposi tlon. A8LB ttatements on use of
summary dlipoiitlon flagrantly disregarded by NRC 6 util
SHIRLEV.B J 8*nta r[anlca,CA 82/1O/06 Atomic Safety and
Licensing Board Panel 6pp 15640 193 24X Flchr 5O-I4S. 83/1O/06,
8310080077
6310130361 Reiponsi opposing Committee to Bridge tha Oap 830920 notion
to dlsmin NRC & applicant 820701 summary disposition
motion* Eitension until 9-2111S should be granted to allow
Committee reiponse W/Cert If icate of Svc
WODDHEAD,C P Hearing Branch I 82/10/00 Atomic Safety and
Licn*ing Board Panal 26pp 13693 184 24K Fiche 90-142,82/10/08,
02101 S0261
9210150454 Rupontt oppoiing Committee to Bridge the Cap 92-0930 motion
to dismiss NRC ti util inotioni for summary disposition
Comminion rule* preclude dismissal of summary disposition
motion* filed per ichidul* W/Certlf lat of Bvc
CORMIER. W H California, Univ ofi Los Angeles, 32/10/06 Atomic
Safety and LUenilng Board Panel l?pp 15703 13S S4X
Rich* 90-143,02/10/00,8210150456
B2I02S0076 Forunrdi UCLA 821008 Itr to NRC amending Fell 1980 licn**
reniUMl pplicatlon Change* include reducing licensed limit
on permlislble Inventory of fuel to lets than 500 g
enriched U-339
CPRMIER.W H California, Univ. of, Los Angtlei. G2/10/1S
FRYExJ H < PARIS, H , LUEBKE, E A Atomic Safety and Uc.n.ing Soard
Panel llflp 13789 353 24X Fiche SO- MB. 82/10/1 5, 8210230076
DOCKETED ITEMS
8210350223 Memorandum t order denying Committee to Bridge tha Gap (CBfi!
620920 motion to summarily dismiss NRC & util motions for
lummarij disposition or alternative relief UCLA.NflC tt CBO
must furnish lists of citations of matt fact
LUEBKE, E A , PAR IS, O H . FRVE. J H Atomic Safety and Licensing Board
Panel 82/10/25 Commit toe to Bridge the Gap 12pp 15789 314
34X Fiche 50-142.83/10/23, B2102S0223
P Operating license itag tfoeumints correipondenc e
Requeits amend to application for 10CFH70 lic*nse to reflect
reduced inventory of unl rradiat ed U-235 reactor fuel
THOMAS. C Standardnation ! Special Projects Brancfi 82/09/27
MEOST.M F California. Univ if. Los Angeles lp 15696 OB2 24*
Flche 50-142, BS/OW37, 02101301 I 5
6210500091 Application for amend to Feb 19QO renewal application for
License R-7 I, rep I ac 1 ng pages re reduction of permissible
inventory of reactor full t altering purpose & function of
lafety high I BVI I radiation monitor
WEQST, H F California. Univ of. Let Angeles 92/10/O3
THOMAS, C Standardifat ion t Special Projects Branch lOpp
157B3 198 24* Flche 50- 143. 85/10/08, 821O20OOB1
B21Q25D076 Forwards UCLA B2100B 1 tr to NHC amending Fab 19BO license
renewal application Changes include reducing licensed limit
an permissible inventory of fuel to 1 e*s than 500 g
enriched U-235
CORMIER, HH California. Univ of. Las Angeles
FRYE.J H , PARIS. M , LUEBWE.,
DQCKEF 50-153 DIG ROCK POINT MJCLEAR PLANT
F Security, medical' emergency fr fire protection plant
Panel
UPP
S2/10/15
Atomic Safety and Licensing Board
15739 352 34X Flcfie 30-142.83/10/15.6310250076
Inepection reports, IE Bulletins 6 c orresp otidenc B
6310290033 Partial response to FQIA request far documents re UCLA Lab
tr research T sac tori Forwards documents lifted in Ajip A
FELTON, J M Division of ttult-s and Records B2/09/03 HIRSCM.D
fiovernm.e-nt Ac coun taoi 1 i ty Project 3pp 1 5B64 195 24 X
ricfit go-i-12, es/c-7^03, eaioa023
9210290049 Discusses imp of activities duthariied under License fi-71
SNH-9T4 on 750520 No ooncomp 1 lance noted Major areai
Impacted control of EMM t. uleetive eians of procedures d
personnel i nttrvi euis
ENOELKEM, R H Region 5, San Francisco, Off lie of the Director
75/Ofi/IO BROHN. W V California, Un iv of. i_m Angeles lp
I5B44 562 24X Fiche 50-142. S2/O9/03,821 0290023
DOCKET 5Q-I4B WWIV OF KANSAS RE9EARCH REACTOR
H fieneral corr tspondence
B209270090 FOIA request tor six documents re Unlv of KS research
reactor
flOaiNEOH, S Affiliation Unknoun B l 2/O9/47 PELTOW, J tl Dlvnion.
of Bulei and Hflcordi Spp I9i3fi &1O 24X Flche-SO-He.e3/09/O7,
9203290097 FQIA request tor dacumentl re Univ of KS rviearcn reactor
UARNESjC Affiliation (Jnfctidun B2/09X07 DocketinS ft Servicea
flcanch lp. 15BB7 119 SAX Fiche 50-I4B, 92/09/O7, 830Q290097
82100&04G7 Hesjondi to FQIA request for si* documents r? Univ of KS
rexaarch reactor Req.u<st referrad to PDR For protesting
FELTON.JM Division of Rules and Records 82/09/13 HOHIHSON, 8
Affiliation UnHnoun lp JS636 212 24X Fiche. 50-14B, B2/0/13,
6210060437
B2iOaS03Bf Respond! to FQIA request for lifted document* rg Un I v of K9
r'lfarch raac tor R>q.uest referred to PDR far pracesilng
FfLTON.J H Dlvllign of Rules and Records BSfCf}/ 14 BARNE3,C
Affiliation Unknown lp I5B59 ISO 24X Fiche SO-14B, BB/09/14,
S2102S03B9
DOCKET SO- 131 UNIV OF ILLINOIS RESEARCH REACTOR
g deportable occurrencet. LEfli & related eorre ipondencr
831013047i RD from B20103-O5O5 reactor operated undar rKctor operator
iii/^eiplrad lie ini. Cu*Bd by ov*rsight Unllcenied operator
in charge of operation For jpproi SO-h. Individual tFiling
application for Hc<n*e
BECK, 0. P Ulinoii, Univ of, Urbana~Ch<npalgn 33/09/29
Dlvitioti of Llceniing ttff 156S2-141 34X Fiche 30-1S1.B2/09/S9,
8310130476
92100&0232 Foruard* "tlill f "~e protection info re associated circuitsn
alternite safe inutdoun design & emergency condenser caustic
attack, in response co NF1C 830430 Hr t, MJC questions raised
during BSOTOB-O? site meetino coneernino 10CFH50 App B
UANDEWAt-LE, D J Consumers Power Co 62/09/30 CRUTCHF1EL.D. t>
Gperafing Reactors Branch 5 57pji 15620 062 24X
Fiche 50-155, 82/09/20, 6210060232
9310090279 Confirms commitment to incorporate responses to IE Inap Kept
50-155/61-17 into emergency plan implementing procedures t.
requests approval to use general ofc control ctr as
temporary emergency operation! facility
VANDEWALLE. D J Consumers Power Co B2/10/01 KEPPLERi J (lesion
3, Office of Director 5pp I 5638 203 34X Tichc 50-1 55. B2 / 10/01.
9310080379
B21Q2Q0039 FoTiuards emergency preparedness pamphlet for use in S-milt-
mergincy plannlns 'one in Charlevon Count V & part of
Em nit County Pamphlet incorporates revisions fc mods set
forth lt> ASLB B30B06 partial initial decision
(JALLO.J Isham, Lincoln t BeaU CALLO, J Consumers Pouier -Tn
32/10/14 OLOCH.P B . PARIS.O H , SHQN, F J Atomic Bafetg and
Licensing DoariJ Panel 30pp 15756 1-19 24X Tichc 50-1 55. B3t 10/11.
321020002?
6210250371 Provides addl info on proposed shift technical advisor
position based on review of plant administrative procedures
ii lite emergency plan Si implementing procedures Min shift
provide* necessary protection jn event of emargencij
DORDINE.T C Consumer) Power Co 02/10/19 CHUTCHFIEt.!), D
Qperatino Reactors Branch 9 Jpp 15790 136 2flX
Ficfi* 50-1S9, 62/10/19, B2I0250371
Ad judl CJtoru. rorreipondenCE
8210010400 Motion for extension of time until 921011 to file petition,
for reconsideration 4/or motion For clarification re
amor) trie Y planning portions of ASLD B20914 decision
Certificate of Svc end
OALLO.J Consumers Pouer Co OALLD. J Isham, Lincoln !. Dnalfl
B2/09/38 Atomic Safety and Licensing Hoard Panel 3pp
13S7S 176 24X Flche 50- 1 35, 93/09/2B, B210010-IOB
D2IOO 10146 ForuariK util 320916 1 tr to NRC re future scheduling
matters- in ipsnt fuel pool mod proceeding Delated
corrup ondence
OALLO.J llham. Lincoln Si Brale OALLO, J Consumers Pouer Co
32/09/29 BLOCK. P B , PARIS, D !i . BHOM, F J Atomic Safetu anil
Licenilng Board Panel 4pp 1 5572 292 24* Flcho 90-155.02/09/29.
3210010446
B2100400HI Forward! proposed finding of fact fc conclusions of law on
O'Neill Contention It E 3 re critlcalitu
GODDflHO.R J Hearing Hrancli 3 82/1O/OI HLOCH, P U , SHONt T J ,
PARIB,D H Atomic Safety and Licensing Board Panel lp 15504 QJ.?
24X FUhl 50-lSS.a2/10/01,62100400BI
B2100400B3 Propoied findings of fact & conclusions of lau on O'Neil)
Contention II E-3 re criticality
CODDARD, R J Kiaring Branch 3 B2/10/01 lOpp 15SQ4 313 24X
Fiche 50-153,82/10/01,8210040081
S3100S0232 Propoied initial deciiion on criticalltg contention
Certificate of BVI encl
GALLO.J , THORHTON.P Con*umeri Pouier Co OALLO, J Isham, l-incoln
t, Biale 92/10/01 26pp 15610 353 24X Fichs 50-155,82/10/01.
B2 10030233
9210050356 Proposed findings of Fact h conclusions of lau on
critlcalitu cgnt'ntion Certificate of Svc encl
OM-LQiJ , THORNTON.? Consumers Pouier Co OALLDi J Iihaf. Linteln
* Beale 93/10/01 17pp 13609 035 24X Flche 50-155i S2/ 1 0/01,
821005035a
B210060204 Hut ion to estiollih hearing dates during uik of BBl 1 1 S-19 to
lltlg*te Chriiti-Maria CDntentioni 2,9(11,9(61,9(8) k 9(9) &
O'Neill Contention! II A, II D I tt E-4 Earlu resolution of
iiiuti serves intereiti of parties W/Certlf icate of Svc
OALLO.J Cnniumsn Power Co OALLO, J Qallo< J 82/10/01
Atomic Safety antf Licintinj Board Panel Qpp 15614 163 24X
Fichl 90-199.62/10/01,8210060204
BS100a0192 Order deferring briefing of Chritta-Maria eiceptions to 4BLB
920719 third partial initial decision b tailing time far
filing eiceptlons to future partial initial decisions until
vc of last decision Piecemeal revleui unproductive
TDMPKIW8, B A Atonic Safety *nd Licencing Appeal Panel B2/ 1O/0-1
3ff 15613,270 S4X Flche' 50-159, B2/10/Q4, SB10060192
DOCKETED ITEMS
15
51O13Q44B Forwards reply to intervenoi proposed Finilings of fact
conclusions of law on O'Neill Contention 1 1 -C re cask drop
i s ue
COPELAND.V G Isham, Lincoln & Heale CQPELAND, V O Consumers
Peuar Co B3/10/06 QLOCH. P B , PARIS, O H . BHON. F J Atomic
Sdfety and Licensing Board Panel lp IS6B2 110 24X
Fiche 50-155. 03/10/06,8210130449
0210210349 Memorandum , order denying util B21001 motion to establish
hearing dates & 821013 motion far clarification Hearing on
times delated by applicant deferred Clarification motion
not ripe for adjudication
EILOCH.P , PAfHS.O H , SHOW, F J Atomic Safety and Licensing Hoard
Panel 02/1O/19 Consumers Power Co 3pp 15764 201 24X
Fiche 50-155.02/10/19,3210210349
-B2I0130457 Replij to intervenor proposed findings of fact ti conclusi
of lati on O'Neill Contention Il-C re cask drop issue
GrtLLD.J : ropELAND.V G Consumers Pomer Co OALLO, J Isham,
Lincoln '. Denis B3/10/O7 9pp 15602 119 24X
Ficlie 50-155,92/10/06,0210130440
-0210130471 affidavit of TC Dordina r
.isual acuity requirement for cra
u/stds of ANSI B3O 2-1976, "Overhe
nanniNE, T C Consumers Pataer Co
F-icho 50- 155. B3/10/O6, 8210130440
e util commitments to upgrade
e operators to comply
d t, Qantrys Cranes" to
15652 1 20 34X
D210150300 Motion for ei tension of time until B212O3 for util to
denonatrate that def i r t enc I es ore remeif led. are not serious
or arc being remedied Util has diligently pursued steps to
addi ess def ic icnc ies
GALLO, J Consumers Power Co GALLO, J Isham, Lincoln & Beal
82/10/12 Atomic Safety and Licensing Board Pane! Spp
13707 273 34X riche 50-155,03/10/12,0210150300
--EI2IQI50307 Affidavit of HIJ Sinderman re util ac
ASLH 820914 initial decision Adrfl time requir
h document info in nanner consistent [u/ASLfl r
Certificate of Svc encl
SINUEBHAMpR U Consumers Power Co H2/10/1I
24X Fiche 50-155. QZ/10/ 12. B2101 503OO
tions in rospona
ed to assemb 1 e
c q u e s t
I6 P n 15707
B21QI50341 Responses opposing licensee motion to fragment hearing
Intervenors would be domed right to be represented by
counsel , noney luould be masted & fragmentation would violate
intent O f ASLAD order Certificate of Svc end
SEUHCLiU Chnsta-Miii la SEHHEL. H AntiQth College of Lau
02/10/12 Atomic bafety and Licensing Board Panel 6pp
1570600? 24X Fiche 50-155,82/10/12,0210150341
BJ10150470 RBRly to Cftr i sla-Mar la 0H0927 propoaad findings of fact 8c
conclusions of lau on Q'Meill Contention IIE-3 ro
cnticality Contention M/o merit t- should be dismissed
Certificate nf Bvc encl
GALLO.J , ThOfiNTON.P Consumers Pouier Co QALLO, J [sham, Lincoln
4 Deals S2/IO/12 lOpp 15703 063 2flK Ficne 50- 1 55i 02/1 0/13,
82l0150i}70
S210ia02Oh Mplion for clarification d/or petition for reconsideration
of portion of ASLB 020914 partial initial dBcifiion re logjl
reiliiircment of NUREQ-0654 Terra "relocation requirement"
unclear Ceitificate of Svc encl
GAULO. J Consumers Power Co OALLO. J Isham. Lincoln b Beale
13/10/12 Atomic Safety and Licensing Board Panel 6pp
15710 I2S 24X Fiche 50- 1 55. B2/10/12, EJ2101S0306
B210I6034J Motion for eitension of time until 021013 to File motion FDI
clarification i>/ar petition for reconsideration of ASLB
B20914 partial initial decision Holiday to honor Columbus
Day not considered In schedule
OALLD, J Consumers Power Co OALLO, J IB ham, Lincoln & Deale
32/10/12 Atomic Safety and Licensing Board Pansl Spp
15718 059 24X Flehe 50- 1 59. 02/10/ 12. 02101BO243
8310210331 Opposition to licensee motion to continue plant operations
w/o compliance ui/ASLQ order on emergency planning Continued
operation u/o adequate planning poses throat to lives 1
health of citliens H/Csrt 1 f icate of Svc
SEI1KEL, H . HIKTQf.D Chr i sta-Mana SEMHEL, H Antioch Collego of
La<ii 03/10/21 Atomic Safety and Licensing Board Panel 6pp
13765 153 24X Fiche 50- 155, B2/10/21 , Q3102 1O30I
0210220330 Memorandum (. order granting util 321012 motion for eitalifliiiii
of time until 821203 to tomply w/ASLB 331014 order to
demonstrate compliance Hi/Commission emergency planning
requirements
BLOCH.P D , PARIS.O H , SHON. F J Atomic Safety and Licensing Han Hi
Panel B2/1O/21 Carolina Powar 4 Light Co 3pp 13776 OOH
24X Fiche 50- 1 55, 02/10/21 , 821023Q333
0210250301 Advises that Region 3 will notifij util to delete erronoilus
language in omaroency preparedness pamphlet re respiratory
protection measures Mods mould not contreveno ASLB order
OODDARD.P, J Hearing Branch 3 83/10/23 DLOCH. P B . PARIS, II ,
SHON,F J Atomic Safety and Licensing Board Panel Spp 15790 I' I')
2-JX Fiche 50-155.02/10/32,8210250301
B310290291 Confirms Q21Q26 telcon Intervcnor has not decided whutlinr
to file 10CFR2 306 petition to suspend or revoke license
because of emergency planning concerns
DACHMANN.RO Hearing Branch 1 B2/IO/2B SEMMEL.H Antioch
College of Law Ip 15054 072 24X Fiche 50-195,02/10/28,
03103902?!
J Insurance & indemnity information
S210050100 Submits responses to S20712 questions concerning add I
insurance coverage re B20622 request for exemption
BACON. J L Consumers Power Co B2/00/10 SrtLTZMAN, J Office nf
State Prooranu, Director 3pp 15603 390 24X
FJelie 50-153, 02/06/10.8310030100
P Operatinj license stags documents fr correspondence
Q2I03B0013 Responds to FOIA request for all i nterna I. non-pub I ic
documents, nomosi evaluati on repts fr other mat! dealing u/
nuclear plant operations Forwards document' listed in App A
rELTON, J M Division of Rules and Records 92/09/17 MCINNISi I)
News & Observer 5pp 15B60 065 24X Fichu 50-OOO.B2/09/17,
B2102B0013
0203310034 Forwards draft info notice i-e deficiencies in air filtration
(- ventilation sys Hot ice based on radioactive resin releiae
at Pilgrim 1 & on four related events at other plants
involving deficiencies in maint '< testing of filter sys
MATTBOM.n J Division of Systems Integration (post BI1005)
82/OB/OS JORDAN.E L Division of Engineering t. Quality
Assurance Spp 15B61 024 34X Fiche 90-000,02/09/17,0210200011
G2I0150167 Homorialiies B2100B telcon u/ASt-D re NfiC position on util
B2IOQ1 motion to establish hearing dates NRC agrees to
splitting hearing into tuo phases but dates pose unalterable
conflict u/another hearing for ASLB chairman fr NRC counsel
GODDARD.R J Hearing Branch 3 B2/10/13 DLOCH, P D , SHON, F J ,
PARIS.O H Atomic Safety and Licensing Board Panel 2pp
15707 100 24X Fiche SO-I 55, S3/10/I3, B3101 30167
8210150469 Forwards Zech 031012 trip rept of 930929 site visit,
suirraan i ing events t, conversations
ROBERTS,! M Commissioner* S3/10/I3 SEMHEL, H Antioch College
of Lam BEMMEL.H Chr is tfl-Mar la 3pp 15703 060 24X
Fich* 50-155,83/10/13.0310150469
0210200029 Forwards emergency preparedness pamphlet for use In S-mtle
emergency planning tone in Charlevoi* County & part of
Em-net County Pamphlet Incorporates revisions t* mods sat
foi-tn in ASLD 030806 partial initial decision
GALLOr J ISham, Lincoln L Beale GALLO, J Consumers Pouier Cn
62/10/14 BLOCH.P . PARIS.O H . SHON, F J Atomic Safety and
Licensing Board Panel 30pp 157&S 149 24 X Fiche 50-153/ 83/10/14,
62 1 0200039
10
DOCKETED ITEMS
B210Q7001B Draft "Offsite Dose Calculation Manual," Palisades Plant
t Consumers Power Co B2/O9/24 55pp 1562B 276 2**
Fiche SO-QOO, BJ/09/29, 9210070013
8210050425 Foruardt "Evaluation of High Energy Pipe Gruak Inside
Containment for Big Rock Point Wuclear Plant," in response
j- CFP Tt\fiit III 5 3
MANDEHALLE, J Consumers Paw** CD 02/07/30 CRUTCHFIELB, D
Operating Reactors Branch 5 2pp 15607 042 SAX
Firhe 30-103. B2/09/30, 821005042S
aalOC-50427 "Evaluation of High Energy Pipe Break Inside Containment foi
Dig flocl Point Nuclear Plant "
WEBER. W V MAGEfl.T R , R ICCftHDELLA. P NUTECW (Nuclear Technalngu,
Inc I CPC-Ot-110 fiOD Bl/IO/33 7"?pp 15407 044 34X
Fl-che 50-155,83/09/30,8210030425
E2I006015? Cornmen,U on WflC draft safety evaluation of SEP Topic V-5,
"RCPD toalrBB Dt tectaon. " per 820319 request Info muting
from T*ole* I J 3 of S3O319 subrtiittal encl Detection au>
(neat Intent of current licansunj criteria
VANDEWALLE, D J Consumers Pouer Co B2/O9/30' CRtlTCHFIEUM)
Operating Reactors Branch 5 9pP 1SA14 047 2<IX
Fiche 90-153, 62/09/30.8310060152
6310060239 Forward* response to HttC request for add) Info on SEP Topic
1(1-2. "Wind & Tornarfo Lo-adinji " ApP C soporsndes 0SO903
subnlttal Dratiins Jhotiing croa-*c t ion of south end of
control roon uall Jn be retrieved from NMS5
VANDEWALLE.D J Consumeri Pousr Co B2/O9/30 CRUTCHFIELD. D
Qfei-ating Reactors Dranch 5 12pp ISil^ 327 24X
F(cne 50-13S, B3/09/30. 8310060239
B210060341 "Spec* for Dea igning , Furn 1 sh ing t Erecting Jietnfor ced
Concre'te Ch inney "
* Bethtel Corp 31S9 C-21 41/03/17 I2pp 1561 339 H4X
Fichs 50-(35, 92/09/30,3210060339
S310250091 Forwards draft safety evaluation Ic tecfinical evaluation
rept, "Desijn Codes, DBS ig n Criteria 6 toad Combinations
(SEP I1I-7 B>,Bi9 Rock Point IJ Utll requested to respD-ndl to
factual -CDrrectneii of SER in 30 rfaijs
CflUrCHFIELD,D Oparatins Reactors- Branch 5 B2/0'9/30
VANDEMALLE,1> J Consumers Poiuer Co llpp 157BB OO1 34X
Fiche 50-155. 83/09/30, 8210250091
82Q7I60459 "Daiign Cades, Dei I gn Criteria Si Loading Combinations
(&EP 111-7 BI.Big Rock Point," technical evaluation rept
STILHELL.T FranHin |nt tl tuta/Frank 1 in Ruearch Center
HflC-03-79-I IS TEJ1-C5257-317 82/07/13 PEFlfilNKO, D NHC - Ho
Detailed Affiliation OJv*n al^pp 157BB 012 24 X
Flch* SO-1S&, 82/0-J/30, 0210330091
821015046'? Foruardt Zech 821012 trip rept nf S2092B *ite visit,
iu-nraari i ing events t, ronvenati nns
ROBERTS, TH Commissioners 92/10/13 SEMMEL. H rtntiocli College
of Uau SEMHEL.H Chn sta-Har la 3pp 15703 06O 34X
Flche 30-155.52/10/13,5210150469
luation of SEP TQJIIC
Low Pressure
Core spray 5i; E
821O150533 Co/n-nenti on 020015 final safety ev
V 1 1 A, "Requ irementt for Isolation of High
Sys" * V-ll B, "RHFI Interlock Requirements
designed to perform function safely
TCUEH.K A Consumar Pouer Co B3/10/13 CFiUTCHFlELD, D CJpcrdtir
Reactors Branch 5 flpp 15713 115 24X Flche 50-155, 92/1O/ I J,
BSl 0150533
821O230213 Forward! evaluation of SCP Topic I 11-4 C, "Internally
elated SEfi Facility
Will be basic input
Generated HissilEi," >r
criteria for topic Irtf
sarety atseisinent
CRUTCHF1ELD, 1) Operating Fleactor? Branch
VAIJDEUALl-e. D J Congumers Power Co 25pp
Flche 30-153.82/10/14.0210250213
its acceptance
integrated
02/10/14
IS/OH 247
e2tO22036S Forwards safety evaluation of MJRCG-0737. I turn 1 1
"Containment Isolation Dependdb i I i ty " Facility meets
guidance Item resolved
CRUTCHFIELD, D Operating Reactors Branch 5 O2/IO/10
VANDEHALLE, D Consumers Power Co 5pp 15/79 IB 1 ? MY.
Fiche 30-153, B2/10/IB, 0210320360
0210260323 Forward) Amenil 54 to License DPD-6, safety evaluation lr
notice of ncuance ! availability Amend approves Tech bpec
changes re NUREQ-0737. Item [I F 1(3) on leal testing
intervals
CRUKHFIELD, C Dperatinj Reactors Branch 'j 02/10/lB
VAHDEHALLE.D J Consumers Power Co Ip 1 57vO OiO 24X
Fiche 50-155. 02/IO/lfi. B2ID25O323
92103503^7 Amend 34 to License DPR-i. chang i ng Tech Specs re cantainnFiil
high radiation monitor requirement by TMI Action Item
II F t(3) on leal testinq intervals
CRUrcHFIELD, D Operat ing Rear tors Branch 5 32/10/10 IDpp
15790 Oil 24X Fiche 50-155. B2/IO/ 18, BJ[ 02503^3
--921O250333 Safety evaluation supporting Amend 54 to License DfR-i,
Office of Nuclear Reactor Regulation, Director (32/10/111 Jpp
15790 021 24X Tithe 50-155.82/10/18,6210250323
8210250337 Notice of issuance !. availability of Amend 54 to LuBiist
OPR-4
CHUrCHFlELD,!) Operating Reactors Branch 5 02/10/10 3p p
15790 034 24X Fiche 50-135,02/10/1810210250323
S2I013032& Cnmment* on propoad scDpe o* Phase 111 of SEP at reflected
tn indivlrfual tropic definitioni ajpended to H20909 Itr
Staff encouraged to ifovaiop & Implement msans- to Incorporate
poiitlv* ittrlbutei of Phase Itl in I Ic rnse e/MRC interface
KACICH,R H B-p OtuneTi Croup KACtCII. R M Northeast KueUar Energy
Co 4uli4 of Northeast Utilities) S2/IO/07 EISENHUT, D
Division of Uctnitng ?PP I SASS 179 24X Flchs 5O-000, Bff/IO/07,
82IOI3032&
82101S050S Advili of FranHin Research Cfcr BS043O technical
evaluation rapt, "Containment Leakaoe Rabe Te,stira-(A 041."
Eiemptions for initrument preitUTe- Unas should te granted
Wo significant dearadatlon of panetrfltion seals observed
DOHDIHE.TC Carolina Power t. Light Co 82/10/13 CHUTCHFIELD- D
Operating Reacton Branch 5, Set 15714 2 IO 24X
Fuhe SO-I&3, 83/10/13. 8210150303
S2IOl?Q'!59 forward* curratlE status of projiroin to evaluate adequacy of
overload ( *hoirt-clr(u i t protection *<ir alctrl<al circuit!
that p through reactor containment p-ef SEP Topic VIIf-4
"Elsctri^al Penetrations of Reactor Containment."
TOMES. K A Consumer* Pownr Co BH/IO/12- CRUTCHFIELD, D Oparatinfl
Rejctors Branch 9 2IpP 19740 26B 24K Fiehe 50-000, B2./10/12.
BB10190-1S9
8210300041 Forward* afety evaluation of SEP Topic IX-3, "Ventilation
S>ft " Evaluation uill bi basic input ta inte<grat*d safety
aiitisreent Aim forwards "Rgvlew aP Pe*lgn It Dpiration of
Ventilation Syi For SEP Plants," technical evaluation rept
CRUTCHFIELD, D Operating Reactor* Dranch S NRC-03-79-UB
B3/10/1K VflNUEHftULKi J Consumeri Pou>r Co 9pp 19735; 3 SB
24.X Flch* 50-159. B2/10/I8, 8210200041,
B2QB18QOS2, "R'tvleu of D*lgn b Operation of Ventilation B?* for SEP
Plants," final technical evaluation rept
HERR10ri,R.C Franklin Intlt-utB/FrnklIn Reie-rch Centrr
NftO-jOa-79-tIB. TER-C52S7-4I4 B2/03/I3 BBOWN, 3 NRC - No
, Olt'll Affiliation Oivenj, Slpp 15756 009 24K
6210220117 Foruarils CE turbine hydraulic control lever Diagram
21273I6-A (ALTO).r>q,uestad t>(j Power Si(> Branch during 821013
conference rail per SEP Topic I II-4 B, "Tirroinc Missiles "
TDMEfJ.K A Consumers Pouer Co 92/1O/I9 CRUTCHFIELD, D Operating
Reactors Branch 3 2pp 15770 147 B4X Fiche 50- 15S, 02/10/ IV.
8210220117
8210E70370 Foruiards draft tafetit evaluation of SEP Topics III-6>
"Seismic Design Considerations" & III-ll. "Component
Integrity " Lieiima analyses of struc tures- hurl Bd piping &
reactor coolant loop piping inadequate
CHUTCHFIELD.D Operating Reactors Dranch 5 03/10/19
VANDEHALLE. D Consumers pouer Co 3ipp 15852 04E1 24X
Ficfie 50-153, 83/10/19,8210270270
8208110271 Foruarifi geotechnlcal review of leismic safutg margin 'lull
In response to virbal request during 620534 meeting Range of
10! I shear moduli values used in parametric study by
licensee adequately envelope expected values
LEAR<0 Hydrologic & Gen technical Engineering Dranch B2/07/30
RUSSELL, M T SylteiMtic Evaluation Program Branch lOpp
15B52 108 24X Fiche SO-I35, B3/10/I9, B31027027O
9303230010 Foruards "seismic Revivui of Rig Rock Point Nuclear Payer
Plant Containment Shell Strui ture, as Part of SEP "
LO, T Llurnce Livermore Lahoratory FIM A-O43i Q2/05/2O
RUB9ELL,H T Syitematic Evaluation Program Drflnch Ip
15838 11B 24X FIch 50-155,82/10/19,6210270270
BSO-3290020 "BismU Review of Big Roc* Point Nuclear Power Planti
Containment Shell Structure, s Part of SEP "
LIAMiC V goto, Inc FIN A-0436 SBO-307 B2/04/30 NHC -Hi
Di-tUed AfFillation Qiven SBpp 15032 119 34 X
Fiche 80-133,82/10/19,0210370370
82102702B8 "Selsmlt Desion. " informal ttchnical evaluation npt
CALL, v 9.1 THOMPSON, t R K0t,0, Inc FIN A-o424 EOO-EA-60S1
82/99/30 HERRINQ.K Diviiion of Licensing S2pp tSBSS 146
24X FUfit 30-198,82/10/19,8210270270
DOCKETED ITEMS
3210250310 Forwards safety evaluation of SEP Topic XV-19,
....clients Resulting From Spectrum of Postulated Piping
Breaks Within RCPB (Rad 10 lagi ca 1 ) " Facility meets
ate e a tape e criteria
CrtuTCHFlELD, 1> Operating Rejctors Branch 5 13/10/20
WUPEWALLE, D J Consumers Pomer Co lOpp 15770 033
Fiche 50-J55. B3/10/20 921OS503IO
5 Reportable occurrencei
Delated correspondence
3210060351 PNO- 1 1 1-83-099 on 820914, ABLB issued order delinoating
rfef ic lends) In state otftite emerge ttL\) pre parerfness UtH
given 1 month to domotiitra te deficiencies remedied
PAGLIARO. J . AXELSON.H , PAFERrELUO. C Region 3, Office of Director
Bi/09/20 Ip 1563B 11B 24X Fich* 50-1 55, 62/09/20, 021000035 1
S210270263 Advises that NlWEG-0737, I terns II K 3 IB S. II K 3 45 ro
autonatic dep i essur i lation sijs, inapp 1 1 cab 1 e to facility
rfierefoi e. I terns resolved
CJiUrCHFlELD. D PperJUng Reactors Branch 5 B2/10/20
VHNDEUALUE. D Consumers Pouier Co flpp 1 5BS9 O43 24X
Fitfie 50-155, 82/1O/30. 821O270265
Inspection rppoi ts, IE Bulletins '' correspondence
T Hearing transcripts on non-ant i trust matters
6210590360 Forwards, signed original transcript of L Reiter deposition
taken on B20917 W/o enc 1
DACHHANN.fi Hearing Branch 1 62/10/39 OAL-LO, J laham. Lliieoli
>, Qeate OALLO.J Consumers Pnuier Co Ip 13053 OB9 24X
Fiche 50-155. 82/lO/28,021O2'?Q3fi0
0^10050336 Acli receipt of B20 1 ?!? I tr informing NHC of seeps taleii to
correct noncomcl lance noted in IE Insp Hept 50-155/B2-12
SPESSAID.R L Division of Project >, riesidcnl Programs H2/O9/2-1
DEIJllf.P. B Consumer? Power Co ID ISblO 098 SIX
FichP 50-155, f!2/09/2fl.S3!005O336
--62100503'12 Responds to NRC 82031? l*r ic noncomp 1 lance noted in IF Insp
Rept 50-153/U2-12 Corrective actions unau thori i ed activity
terninated on 920617, Fo 1 1 ouii ng reviobi bij operations
super intend ent
VANUEUrtLLE, D J Consumers Power Co B2/09/17 KEPPLER. J
Region 3. Office of Director 3pp 15610 0*79 24X
Fiche 30-155.03/09/24, Q21005O336
3^10030279 Confirms commitment to incorporate responses to IE Insp Hept
50-1 55/EJ1-I7 into emeigencg plan implementing procedures &
requests approval to USD general oft control ctr as
temporary emergency operations facility
E. D J Consumers Pouer Co 02/10/01 KEPPLGR, J G Hogion
3. Office of n lree t 01 -
1563B 203 21X Ficho 50-155.83/10/01,
IE Info Notice 80-35. Suppl
Implant Deeds " Sue list ccl
COHQ. L 1 Division of Fuel Facilities. Material
63/10/06 Consolidated Edison Co of Neu Vort
2'1X Fiche 50-000, S3/IO/06.B20Bl 1 i'02J3
"Leaking t, Dislodgeif 1-125
& Safeguards
A6pp 19761 250
so-140 OEIOROIA INQT OF TECH REBEMICH REACTOR
Inspection reportti IE ftulletlne !. t orresp onitenc e
6310320312 Act re-ceipt of 9.21004 1 tr informing fJfiC of steps taker, to
correct violations noted in IE Inap Rept 9Q-160/B2-02
VEHRELLI. D M Dlviflion of Project !. nemdent Programs B2/10/H
CARLSON, WO Oe-orgla Institute of Technology Ip 15776 1(7 34X
Fiche 50-160, Q3/1O/I4, 831O22O3I2
0210220319 fimponJi to NBC 82Q9QB 1 tr rt violations noted in 1C Insp
Rept 30-1AO/B2-O2 Corroctlvc actions personnel counseled
RUSSELL. J L Georgia Institute of Technology 32/10/04
yeRRELl.IiD M Division of Project fc Jlosiifont Programs 3pp
15776 MB 34X Fiche 50- 160, 02/JO/I4, B2I O230312
--G21022Q323 Foriuarda IE Ir>sp Rep t SO-160/B2-02 on 020025-26 * notttE
of violation
VERRELLI.D H Division of Project !. Resident programs 02/09/00
DAVIS, M V Oaurgiji Institute of Te chnology Spp 19776 121 3 -IX
Flche SO-160, S2/[O/14.D210S203ia
-3210220330 Notice of violation from in9.fi on 020a25-2i
* Division of Project & Resident Programs 03/09/08 Ip
19776 123 24X Ficho 90-E60. B2/ 1O/1 4. 0210320312
3310320233 Forwards evaluation of SCP Topic I 1 1-3 C, "Inserviee Insp of
Water Conti ol "Structures " Insp prograrn needs mod to tonfnrra
nj/Rcg Guide 1 127
CFIUTCH--IEUO, D Clperatinj Reactort Branch 5 02/10/12
VAIIDEWALUr. D J Consumers Poun-r Co Bpp 13775 104 24X
Fiche 50-159, 92/10/1^.9310220233
-B21022034I IE Imp Rapt 50-160/02-O? on 820EJ25-26 Noncoinp 1 lance
noted on B2 05 1 3, i rrad latecT mat I re mo veil from biological
shield penetration H-13 ui/g health pdys-ics supervision
PEEHV, H W , BARfl. K Division of Project fc Resldont Programn
BJ/09/07 -Ip 19776 124 24K Ficlie 90- 160, B2/10/ 14, B910 i aa031S
"Itydrological Cons iileratione Inservice Insp of Water Control
Structurag, (SEP. I I-3A. B, D I , C. I [ I-3D 1. " technical
evaluation repl
SCHERRER.J Frank 1m Institute/Franklin fiesoarch Center
NHC-03 79-118 TEn-C52S7-542 82/04/23 BTALEV, NRC - No
Detailed Affiliation Given ISpp 15775 112 24X
FichP 50-155, S2/10/I2, B210220233
300190230 IE Bulletin 02-03, "Stress Corrosion Cracking in Thlclt-
Wfl 1 1, l.arge~Di ameter, Stainless Steel, lee ircu lation Kyi
fjplng a*- BUR Plants " Svt H E t end
DBYOUNQ.R C Director's Office. Dffica of Inspection anil
HViTortement a2/10'14 Consol iriated Edl*on Co of NEUI York
113pp 1S010 125 24X Fiche 50-000, E13/1Q/ 14, 920H19023B
^10260220 AdvMBi that spiked air partlculste filter being forwarded
to util for analysis, per H20429 discussion Utll results uilll
<> compared u/NRC analysis, in effort to close out open item
i n IE Insp Rept SO-1 S5/S2-Q7
PAPERIELUO,C J Division of Emergemy Preparednsss 4 Operational
Support 02/10/20 HOFFMAN. D P Consumers Power Co Ip
1 SB04 217 24X Ficho 50-1 5S, 02/10/20, 8210260230
?!O2o0315 Ack receipt of B21015 Itr Informing NRG of *tepi taken to
correct violations noted in IE Imp Hept 30-153/92-09
HaRELHIB.C E Division of Project & Resident Prngrami 02/10/33
DEHITT, R Consumers Power Co Ip 15799 32B 24X
Fiche 50-155, S3/IO/22, B21026031 5
Bat03603l6 Reipondi to NRC 020917 Itr r violation! noted in IE Insp
Rept SO-159/B2-0? Corrective actions training procedural k
requirement* revised & luill be clarified bg 830101
VAUDEWftLLE, I) J Consumer* Power Co 02/10/15 KEPPLEfi, J
Region 3, Office of Director 6pp 1S799 329 24X
Flche 50-195,02/10/22,8210360315
DUCKET 50-170 NATIONAL NAVAl- MEDICAU CEHTER
Adjudicatory corraap ondence
0210050273 Order tchBduling B21013 prenearing conferenca in Bet hcada, Ml)
re remaining outstanding issues Pi opposed schedule^ should be
pretented
HOVTiH F Atomic SaF-ety jnd Licensing Board Panel B2/10/01 Sjip
IS609 191 24X FichD 50- 1 70, 02/10/01 , O21Q050373
8210150317 Btcond nupp lemon tfl I respnnte to first set of
interrogatories Certificate of 8vc o-ncl Related
correspondent e
MrtCKLIN.L Citiiens for Nuqlaar Reac tor Safeti/.Inc MACKUIM.L
Initltute for Public Representation 82/10/00 49pp IS701 H70
24X Fiche 30-170, B2/ 10/00, SSI 0130317
8210IS0399 Provides info r counsel for Citiiens for Nuclear F) actor
Safitg E Entuitle to continue as counsel L Hacklin <- tnit
for Public Rp r*nta tion mill withdraw as couniel effective
B21219,
MACKLIH.L Intlfcut8 for Puhlic Konraienta tion MACKL1N, L
Cltiien* fur Nuclnjr Reactor gafatu, tr-c 83/10/08 HOVT,H Atomic
Saf>tg and Lionilng floird Panel Spp 19704 052 24X
Fiche 90-170,98/10/00,0210130395
8210220439 Faruarils motion for end protective order to protect against
public discloiure or rnliutu of I StiMinan addrott ti
telephone number
HACKLIN'L Institute for Public fi*prsnt tion HACKLIN, L,
Citiiens for Noclaar Reactor- Bifet.lnc 02/10/19 HOYT.H Atomic
3f*tg and Ucninlng Board Panel if 15778 S3? 24X
Fiche 30-170. 82/10/19. 0210230439,
8210220448 Motion for protective order to protect againtt public
disclosure or mlui of I Stillman tddraet b telephone
number PropoitJ protective order fc CBrtific*te of Svc encl
MACKLIMiL.M 8, Citiieni tar Nucltr Reactor Siffty.Inc
MACKLIN.L, H, a, Intitut* for Public Rapr eientatinn 82/10/19.
Atomic Safety and 1 Licensing Board Panel 5pp 15778 240 B4X
Fiche B0-1
18
DOCKETED ITEMS
9310250235 Order granting Cltiiens for Nuclear Reactor Safety 621019
motion for protective order to protect againit public
diitloiur* or misuse of I Stlllman address b telephone
number
HOVT.H F Atomic Safety and Licensing Board Panel 83/10/21
Citiiens for Nuclear Reactor Safety, Inc Ip 13780 397 S4X
Fjcne 30-170, 92/10/21. 6310250333
9210360330 Provide! date) when Citlieni for Nuclear Reactor Safety
would be available for plant tour
HACKUM, L Inititute far Public Represents tion MACKL1N.L
Citueni lot Nuclear Reactor Safety. Inc 53/10/31 HOYT, H At omit
Satft<i and Licensing Board Panel 2pp 15837 007 24X
Fiche 50-170.83/10/31.8210280220
DOCKET 50-186 UNIV OF MISSOURI RESEARCH REALTOR
Inspection reports. IF Bulletin* t> correspondence
8210050339 Forwards IE Insp Rept 50-I06/B2-Q1 on B20B16-17 & notitc of
violation
MILLER, JR Division of Engineering 4 Technical Programs IJJJ/O7/ 1 5
AUGER, D H Missouri. Univ of, Columbia 2ap 1560900] .'MX
Fiche 50-186,82/09/15,8310030359
--8210050365 Notice of violation from (rap on B20B16-17
MILLERiJ R Division of Engineering 4 Technical Progiams
82/09/15 2pp 13609 003 24X Flche SO-106, 82/09/1 3, DaiOO'lO !*>'/
9210260423 First supp lementary answers to interrogator in Certificate
of Eve eni 1
BICKARD.D C Armed Forces Radl ob iolooical Research Institute
B3/10/22 Citiiens for Nuclear Reactor Safety, Inc I2pp
1S8O6 038 24* Fichu 50-170,82/10/32,62(0240425
H General corr espondenci
-8310050380 IE Insp Rept 50-186/83-01 on B2QBI6-17 None ompl ianro
noted failure to par form lurveys, to jiosc radlflllun (.
radioactive matls area !< storage of raduiaite at unauthDPi i o d
offsl te facility
LQYENDALE.P C , GRANT, H G , GRCGFR, L It Division of Cng Ittutir nit)
Technical Programs B2/09/M Bpp 15609 005 34X
Fithe 50-1B6. 82/09/15,0210050359
8210150200 Notice af change of addresi
ENTWISLE.E B Citiieni for Nuclear Reactor Safety. Inc
ENTHIBLE.E B EntuisU.E B 85/10/08 Ip 1S701 362
Fiche 30-170. B2/10/08, B3I0150200
T Hearing transcripts on non-ant I truit matter!
B310190238 Transcript of 831015 prehearing conference re licenii
rentuals in Dethesda, MD Pp 653-^38
Atomic Safety and Llcenting Board Pinel 63/10/15 87pp
15713 230 24X Fiche 50-170,82/10/15,8210190239
DOCKET 50-iea PURDUE UNIV RESEARCH HEACTDH
P Operating license stage documenti & correspondence
8210050540 Foruardi flmend 6 to License R-B7 & afetu evaluation Amend
changei Ttch Specs re drop tiraei of shim safetg rods & time
intervals bettugen meetingi or turveillance action
THni-WS.C Btandarduation d Special Projects Branch B2/09/13
8TA^^BERR.E H Purdue Univ 3pp 15637 204 34X
Fiche 30-192, 83/09/13, 6210030340
DOCKET 50-1BS KANSAS STATE UNIV RESEARCH REACTOR
R Periodic operating reports i. related correspondence
8310190365 Submits list of facility nroceduro changes, tea U t,
eiperiments for Oc t l9B|-Sflpt I9fl2,per IQCFRSQ 39<b)
FAU.fi E Kansas State Unlv 82/10/11 MILLER, J R Staniifli d i rut ti
I, Special Projects Branch 2pp 15/40 316 24X
Fiche 30-168, B2/10/11, 8210190365
DOCKET 50-192 UNIV OF TEXAS RESEARCH REACTOI]
P Operating llcenie stage documents t corres pundonce
0310050174 Forwards description of mods to be mado to reactor
instrumentation !< control sgs Changes will moderniie
function or reliability nf currant console functions Phaio
I. Parts A d D of changes completed
BAUER, T L Teias, Unlv of B2/07/30 KUNNICUTT Region 4,
of Director 14pp 15604 121 2flX Tiche 50-193, H2/07/30,
8210030174
-8210030343 Amend 6 to License R-B7. changing Tech Spec limits on drop
times of shim safetu rods i, changing certain surveillance
intervals
THOMAS, C D Standardiiatlon f, Special Projects Branch 62/09/13
Uflp 15637 206 34X Firhe 50-103,82/09/13.8210050540
-8210050548 Eafetu evaluation lupportlng Amend 6 to License FI-0/
Dfficn of Nuclear Riactor Regulation, Director 02/09/13 3pn
IS437 317 34X Fiche 50-182,62/09/13,8210050540
DOCKET 50-164 NATIONAL BUREAU OF STANDARDS HEACTOR
Inspection reportu IE Bulletins 1 correspondence
B210S90300 Foruiards IE Insp Rept 30-I84/B3-08 on 820900-10 & notice
of violation
STAROaTECKI.H Dlvi.ion of Project & Reiident Programs 83/10/09
CARTER.R B Commerce, Dept. of, National Bureau of Standard* 3pp
1SBBS 036 24X Fiche 90-184, 82/10/08, 8310290300
DOCKET 50-199 MANHATTAN COLLEGE RESEARCH REACTOR
P Operating license stage documents t, correspondence
0210050341 Requests guidance on procedure for renewal of 10-yr I Urns*
R-94.uihlth expires on 630930
KANE. R S Manhattan College B2/09/S3 BERNARD,!! Standard | , at I rn
fc Special Projects Branch Ip 13610 120 34X
Fiche So-199. 62/09/28,8210050341
8210260506 Responds to B2Q920 request for guidance In preparing
application to renew license NRC evaluation! of recent
application* end W/o end
u-n 8t*ndardliation (. Special Project! Branch B3/1O/M
KflNE, R 8 Menhittari College 2jip 15830 136 34X
Flch* 90-199,83/10/14,8310360506
DOCKET 50-201 WEST VALLEV REPRBCESSINO PLANT
Adjudlcatoru correspondence
8310390301 Notice of violation from insp on 820908-10
Division of Project i. Rtiident Programs 82/10/00. Ip
15835 036. 24)1 Fiche, 30-104, 82/10/08,8210290300
8210290304 IE Imp R.pt SO-IB4/B 2 -03 on 630908-10 Woncomp 1 lane, noted'
Failure to initrutt uiorler in precautioni, procedures,
purpose t functioni of protective devices used to minimlie
parsonal ciposur* to radioactive matl & radiation
S " '* KEIM !2'SA, D ' V '" on of Fl -J ict * ""* Program,
BB/09/3S 9pp 1S855'039 34X Fiche 50-184. B2/10/OB, 8310290300
R^P.rionic operating reports I. related correspondence
= P rw ; ri11 "Oprations Rept 33, Jan-June 1982,"
(.AER,R S Connerce, Dept of, National Bureau of Standards
iD^ILa o*? MAS ;L D r, ";"" * Bp.ci.I Project. Branch
lp 15673 066 2*X Fiche' 30-104. 83/09/30, B210130160.
82102605BI Forwards NFS t NY State Energ* RW) Authorltu B30916 joint
Itr notlfuing of B30916 settlement date Bettlemant satliPlet
all three conditions of Paragraph B A of License CSF-1 for
rrT n n I 1 "" ' NFS """'tV * fponsibilitg under license
fci)OAH, L Morgan, Lewis i Docklui EDOAn,O L Nuclear FUB I
Dlw,".,!!!' ^P i 9 r bS 'I S*!*" !' C ' 8WW1* CUNNINGHAM, H I.
Division of Fuel Cgcle & Material Safety | p 13830 143 34/
Ficht. 30-301. 82/07/16,8210260581
--82I0260SB2 Notifies of 020916 settlement date Settlement .atl.r.*i
thri condition! of Paragraph B A of License C8F-1 for
MCM n*A i0 V f " FS l au *i ( "' 1 * * "-Mponsibllitu under llc.n*.,
^? ^ ^* Y !;r' ri atf otl Ener V ih t, Development
Administration DEU3TER,R H Nuclear Fuel Service,, Inc ( iwn
Cuc?:W I' ? D ,' /W J* CUNNINOHAM.fi E D!V i n of rl
Cycle I, Material Safetu, l p (SS30 144 24x
Fiche 50-301, 82/09/16.8310360581
"P r ' tl0 "
* M *
3pp.
'P* 33, Jan-June 19BH
j;?5 f( Nttiot l "TMU * Btand.rfl,
67 S4X Fiche 30-184,82/09/30,8210130160
DOCKETED ITEMS
19
8210070183 Informs that time for Commission to rev! eu ALAB-679 eipired
Commission declined review Decision became final agency
action on 921OOI
CHILK S J Office of the Secretary of the Commission 82/10/O5
OirUs of the Eiecutive Legal Director lp 15634 361 24 X
Ficfm 50-201,03/10/05.9210070183
8200170083 "Design Codes, Design Criteria i Loading Combinations
(SEP. I1I-7D), " technical evaluation rent
STILHELL, T C Franklin Institute/Franklin Research Center
hFJC-03-79-llB TER-CS257-31B 02/08/13 PERSIWKO. D NRC ~ No
Detailed Affiliation Given 223pp 15602 013 34X
Fiche 30-206,82/09/51.9310050300
Operating license stage di
?spondence
GEOMORPWC PROCESSES AND EVOLUTION DF BUTTERMILK VALLEV AND
SELECTED TR IBUTARIES, WEST VALLEV, NCM YORK
BDmhXQva.J C . TIMSCN. D S , DUNNE, L A New Yorfc, Stale of FIN
B-6350 fJUREC/Cfi-2862 B3/07/31 Division of Health. Biting t,
Environment l|7pp 157B5255 34X Ficho 50-2OI . 62/07/31.
0210210041
Forwards NFS fc NY State Energy R8.D Authority 820916 joint
Itr notifying of 03071* settlement date Settlement satisfies
all three conditions of Parajraph 1 A of License CSF-1 for
termination of NFS authority & responsibility under license
EDCAR.G L Morgan, Lewis 6 Hoctius EDGAR , G L Nuclear Fuel
Services. Inc (subs Ot Getty Oil Co ) H2/09/16 CUNNINQHAM.H E
Division of Fuel Cycla ( Material Safety tp 1 3B30 I A3 SAX
Fiche 50-2O1. 02/09/16, 021O3605B1
-&21O26Q5S3 Notifies of B20916 settlement date Settlement satisfies a
t-hree conditions of Paragraph B A of License CSF-1 For
termination of NFS authority It responsibility under license
JACK.fi rt New York, State of, Energy Research t. Development
Administration DEU5TER, R 14 Nuclear Fuel Services, Inc (suba
of Cettn Oil Co ) 82/09/16 CUNN [NGHAM, R E Division af Fuel
Cycle !, Material Safety lp 1 5B30 144 34X
Fiche 50-201,82/09/16,8210360561
0207300322 Draft "SEP Structural Review of San Onofre Unit 1
Containment Structure Under Combined Loads "
LO, T Laurence Livermnre Laboratory FIN A-0436 UCID-19141
DfiFr 82/05/31 45PP 1S6Q2 331 24X Ficho 50-206,83/09/21,
8210090300
0210060003 Requests submlttal of fees for B30625 application for
Amend 62 to License DPR-42, permi ttino, delay in safety
injection ys hydraulic valve testing
MILLER. W Licenne Feo Management Branch 82/09/23 DIETCH, n
Southern California Edison CD lp 13636 266 24X
Fiche 50-306,62/09/23,0210060003
0310040062 Forward* safety evaluation rept d technical evaluation re
main steam line treat w/contlnued reeduiater addition
Analysis acceptable
CRUTCHF1ELD.D Operating Reactors "ranch 5 82/09/37 DIETCH. R
Southern California Edison CD 3pP 15534 170 24X
Fiche 30-206, 02/09/27, 021Q010O62
--8210040064 Safety evaluation re main steam line break u/conti nued
Pefduater addition Licensee commitment acceptable
tu/lnstallat Ion of auxiliary faeduater motor driven pump
u/pump runout protection
* Office of Nuclear Reactor Regulation, Director B2/09/E7 7pp
15S94 100 24X Fiche 50-206,03/09/27,6210040062
riOISQ411 Notification of contract elocution , Mod 4 to "West Valley
Wa-ste Burial " Contractor State Univ of NY, Albany
JACOHS,A flesearch Contracts Branch FIN B-6350 62/09/26
QATSOM.H , NICHOLSON, J Office of Nuclear Regulatory Research,
Director Jp 15745 375 34X Fune 50-201,82/09/26,0310100414
-Q3KHH0419 Hod 4. eitending period of performance to 031331 to "Heat
Val Letj Hast e Burial "
HASHER, a J Naiu >ork, State of QUSTrtvE.R p Division of
Contracts FIN B-6350 82/07/26 13pp 13745 376 34X
Fiche 5O-2OI, 03/09/26. 0310180414
OCKET 50-206 SAN DNQFflE NUCLEAR STATION, UNIT 1
Security, medical, emergency & fire protection plans
HlOOa0310 Acle receipt of 820910 Itr informing NfiC of steps taken to
correct violations noted in IE Insp Ropt 50-30i/B2-21
B[SHOP, T W Division of Resident, Reactoi Project & Engineering
Programs 82/10/04 FOGADTY, D J Southern California Edison Co
lp 15640 OfiO 24X Fiche 50-206, B3/ 10/O4, 82100B0210
-B2IOOB0211 Responds to NRC B20B12 I tr re violations noted in IE Insp
Rept 30-206/82-31 Corrective actions nonfire retorilant luoodj
oily rags >j combustible debris removed from areas & amend to
Include emergency light impairment prepared
FOGARTY.D J Southern California Edison Co B3/09/10
ENGELKEN. R H Region 5, Office of Diractor 5pp 15640 OBI 24X
FitJie 50-206,82/10/01,8210080210
?L 0190625 Foruarili Revision 7 to physical security plan Revision
withheld <ref 10CFR73 21 I
PASKIIt. K P Southern California Edison Co 82/10/15 EIBENHUT.D
Office of Nuclear Reactor Regulation, Director !p 13740 039
24X Fiche 30-206,82/10/15,0210190435
Operating license stage documents t- corru t pondsnce
'10iaQ013 Re#pondi to F01A request for all 1 ntlrnal. non-pub 1 it
doc umen tir menos, evaluatl on repts & other matl dealing u/
nuclear plant operations Foruiards documenbl listed in App A
FECTON. J H Oivlslon of Rules and Rvcordi 83/09/17 MC INN 1 3-D
Nw* A Observer Spp 15860 0*S 21X Fiche 50-000,82/09/17,
aa I OS900 13
8B102BOOB2 "Daslmetru Placement for Steam Oenerator Markers "
UA.RWOCK,R Institute of Nuclear Power Operations 02/01/31
13pp 138iO 310 24X Fiche 30-000i 02/09/17, 8210800013
B306030064 "PUR Main Steam Line Break W/Continued Feediuater Addition,
technical evaluation rept
VOSBURY.F H Franklin Insti t i/te/Frantl in Research Center
NRC-03-B1-130 TER-CS5O6-131 82/05/26 HEARN, P NRC - No
Detailed Affiliation Owen HSpp ISSBf 187 24X
Fiche 50-306, 83/09/27, B31004OC-62
0210040153 Advises that util proposed masonry mall test program
ace eptabl e, sub j to satisfactory resolution of concerns
delineated in enc 1 evaluation Add! info requested no later
than 30 days prior to proposed restart date
PAUL90N.U Operating Reactor* Branch 5 82/09/29 DIETCH. R
Southern California Edison Co App 1SSB2 341 24X
Fiche 50-206,82/09/29,9310040153
8310040177 Foruardi "Seismic Evaluation of Reinforced Concrete Masonry
Main, San Onofre Unit 1." Vol 5 Fuel Storage BIdg Soil
Dae I Flit Condition Evaluation, per SEP Topic in-6Noaddl
mods required to fuel storage bldg
BA8KIN.K P Southern California Edison Co B2/09/3D
CRUTCHFIELOi D Operating Reactors Dranch S lp 15563 045 24X
Fiche 50-206. 82/09/30,0310040177
B21004017B "Seismic Evaluation of Reinforced Concrete Masonry Halls,
San Onofra Unit 1> " Vol 5 Fuel Storage Cldg Soil Backfill
Condition Evaluation
* Computech Engineering Services. Inc RS43-03 V05 02/09/30
159pp 15302 046 24X Ficbe 50-506,82/09/30,0210040177
0310130276 Forwards abstract of paper on eipenence gained in
evaluating effect* of high energg line breaks at facility
Paper will be presented at ASHE Pressure Vessel tc Piping Div
$ Analysis Committee 4th Natl Congress
OASKIK'K P Southern California Edison Co 02/10/04 CHEN, P MftC
- No Detailed Affiliation Given 2fp 19678 165 24 X
Fiche 30-206. 03/10/04,8210130276
8210360249 Provide* addl tnfo supporting B20923 position that no fees
are required for Amanif 62 issued 820623 Surveillance program
previously submitted w/Amend 57 For uhlch appropriate fees
applied
BA8KIN.K P Southern California Edison Co 02/10/04 MILLER.M
LUenO Fee Management Branch tp 19779:353 24X
Fiche 50-206.82/10/04,0210260249
0210070082 Dlscuisei use -of raduraste tol Idif I cation syi Unit 3 license
condition does not prevent utll from using Chem-Nuclaar Sijsi
Inc prociis to solidify ujet solid raduaste produced at Unit
1 Baftv evaluation mill be performed
OASKIM.K P Southern California EdUon Co B2/10/03
CRUTCHFIELD, D Operating Reactor* Branch 5 2pp 13623 162, 21 X
Fiche 90-206. 82/10/O3, B2100700B2
'10050300 Forwards draft evaluation of SEP Topic IH-7 D. "Design
Codes, Design Criteria t Load Combinations " Response to
factual carre'c tness of SER t, proposed schedule for
roioluti-an of open items requested uilthln 30 day>
PAULSDN, H Operating Reactors Branch 5 02/09/21 DIETCH.fi
Southern California Edison Co 1 Ipp 15603 001 24X
FlcJie 50-20fi. 02/09/31,8210030300
0210080093 Informs that crane opera ttnfli maint !i imp procedure*
Implemented on 821001 p.r S20704 Itn insuring complianc*
w/NUREO-0412 Cost & implemontat Ion schedule of Items 1'3 to
be campleted by 921215 du* to vendor delays
KRIEOERiR H Southern California EdUon Co 02/10/09
CRUTCHFIELD, D Operating Ractor Branch S lp 15640 S36 H4X
Fiche 30-206.82/10/05,8210080093
20
DOCKETED ITEMS
3210130086 Responds to 330853 ] tr requesting info re SEP Topics [1 1-2 (,
III-* & "Wind (a Tornado" b uithhplfl Bequest cannot be
approved until appropriate affidavit submitted
CRUTCHF1ELD. D Operating Reactor* Branch 5 B2/1O/05 D1ETCH. R
Southern California Edison Co 2op 15473 134 24X
Fiche 3Q-2O4.. 82/10/03, 62ioi3QOBa
6310180070 Forward! Amend 64 to License DPJi-13. laf ely evaluation t
notice of issuance ( availability Amend revl-sei flop A Tech
Specs ti basoi to reflect revised time intervals for
entering various subcntlcal modes
CRUTCHF1ELD. D Operating Reactors Branch 5 82/10/06 DIETCH. R
Southern California Cdnon Co 3pp 15719 351 S4X
Fiche 50-2Q6. 02X10/06, 82101 B0070
921018-0073 Aiiend 64 to License DPR-13, revls ing App A Tech Spec; & base
to reflect revised tims intervals (or enti ing various
luhcr itlc a 1 operational modes when limiting c and it! on cannot
be satisfied
CRUTCHFIELD, D Operating Reactors Branch 5 B2/IO/06 7p p
1571? 354 24X Ficfie 3O-O<b, 92/10/06. B3J 01 30070
82I01BOO76 Safety evaluation supporting Amend t4 to Utcense BPH-13
' Office of Nuclear Reactor Regulation, Director Ba/lO/OA Jpp
15719 341 34X Fiche 50-506. B2/ 10/06, B3 1QIBOO70
B210IB007 1 ? Hotice of issuance t. availability of Ameno 64 to License
DPH-13
CfiUTCHFIELD, D Operating Reactors Branch S 82/10/0,6 3p p
I572Q OQl 34X Fiche 50-BQA, 63/10/06,831 OIBOO70
B210260273 Request* addl time to complete proposed Tech Specs
containment leakage t es t ing, ref I ec 1 1 ng App Jof 10CFRSO, as
requested in NRC G2OB03 ILr Proposed Tech Specs gupected to
be submitted by 321 130
KRIEQER.R U Southern California Edison Cg B2/IQ/IS
CRUTCHPIELD. D Opeiating HeaLtors Branch 5 lp I5B01 331
Fiche 50-204,82/10/15,631034.0272
B2I0260239 Forwards request far add) info to assist in NRC reviPu at
SEP Topic 11-1 F, "Be-ttiement of Foundations t, Buried
Equipment " Revised SAR incorporating appropriate revisions
re soil conditions should be submitted
CHUTCHFIELD, D Operating Reactors Branch 5 B2/IO/1B nlETCH.lt
Southern California Edison Co 9pp 1 5799 139 <34X
Fiche 50-20-tj, B2/10/IB. B210360229
8210260450 Forwards "Status of Category A Unresolved Safely Issuoi .] I
San Onofru Nuclear Generating Station Unit I " Replr provides
descr la ti on. of eacJi issue ie rf i icusiion nf NRC generic bases
for continued operation * site specific con s i ilerat i ana
MEDFQHD.H O Southern California Ediaon Co 63/10/20
CRUTCHFIE4.D, D Operating Reactors Branch 5 40pp ISfiufc 155 ,M
Fiche 50-206,62/10/20,0210260450
S2l02i0472 Forwards Bupp 1 Bfnonlal info rept re NUREG-Oiia. "Cantrnl at
Haavii Loads- at Nuclear Pogier Plants " Rept contains
coFirnitments requiring changes to crane operating procedures
to be implemented b i| [33-01 15
DASKIN,H P Southern California Edison CD 63/10/21
CRUTCHFIELD, D Operating Reactors Branch 5 lp I5g07 230 ?1K
Fiche 50-20&. 63/10/21. B2IQ2A0472
G310130326 Comminti an jiropoEed scope of Phase III o( fcEP as reflected
in individual topic definition* appended to 920909 Itr
Staff encourageil to develop t implement means to Incorporate
positive attributes of Phase III in licensee/NFIC interface
KACICH.Fi M SEP Owners Group 83/10/07 EISENHUT.D O Division of
Licenaina 7pp 136B2 17=7 24X Fiche 50-000,82/10/07,8310130336
9210100065 Clarifies NflC 830630 request for addl Info ft
II B 3i "Past-Accident Samp ling Sgs "
CRWTGHF1ELD-D Operatinj Reactors Hrancfi 5 62/10/07
Southern California Edison Co- 3pp 15730 007 24X
FicNe SO-2O6, 63/10/07, B2IOIB0065
TMI Item
B210260477 "Control af Heav-j Loads, San Onofre Nuclear Gencrat ills
Station Unit 1," supplemental info i-ept
-" Southern California Edison Co B2/1O/31 22p p 1 5007 3H
24X Fiche SO-EOoi. B3/10/21 , B51026O473
0210390169 Foruiarbs Ameni) 65 to License DPR-1 3. safety evaluation b
notice of issuance & aval lau 1 1 1 ti| Amend incorporates
NUREG-0737, Item Ii E I 1 , " Au* 1 1 lari, Feedua ter Pump 5 t,
Valves" Into Tech Spe-ca
CBUTCHFIELD. D Operating Reactors Branch 5 B2/1O/22 DIETCH, (1
Southern California Ediaon Co 3pp 15351 IB1 24X
Fiche 50-206,03/10/22,9210290169
B21 02^02 H Advises that final evaluation to determine applicability
ot EPH I program test results, for power operated relief
val wet i >af ety valves I bl ock va Ives, per TMI Item II D t , mill
be sent by 621130 Delau, due to n-ced for addl analyst))
KR[EOER,R H Southsrn California Eifison Co 8?/IO/OB
CRUTCHFIELD, D Operating ReacUrt Branch 5 lp 1SGO* 265 24K
Ficne 50-206. 92/10/09, B21026.Q2I 4
S210150144 Submits updated icheiiules re NUREG-0737. Items 1 1 E 1 a,
"AuMiliarij Fee-duster Initiation iFlqu Indication,"
I ft 1 3 1. "Limit Overtime," II fi i, "Performance Testing
o-t PHfl RalLf & SaFetq Valvei" t III D 3 4
BAgKIH.A P Southern California Erfiton Co 82/lO/la
CflUTCHFtELD, D Cper-ating Reactors Oranch 9 3pp. 19697292! S4X
Fiche SO-E06, B3/ 10/13, B21O1 BOI44
8210290175 Amsnd 65 to License DPR- 13. me orpnrati ng NUHEC-0737, Urm
II E 1 1, "AuJiiliaTu Feeduiater Pumps b Valves" into Tech
Specs
CRUrCHFICLIh D Operating Reactors Branch S 92/10/22 5p p
15934 192 24X Fiche 30-206,02/10/22,9210290169
9210290130 Safety evaluation supporting Amend 65 to License tll'lt L'3
* Office o-f Nuclear Reactor Regulation. Director 02/lO/ay
ISpp ]SB5a 197 24X Fiche SO-2O6, 82/10/23,
-82102901B3 Notice of Issuance t availability of Amend. 63 to I ii
DPR- 13
CRUTCHFIELO.D Op erating Beat tor s Branch 5 8Sf IO/3B 3|ip
I5BS4 212 24X Fiche 50-306, 92/ I 0/S2. B210290I67
B2 1 0200033 Forwards draft evaluation of SEP Topic II 1-4 Ci "Intarnallij
Centra tad Kliilii " Facility adeq.uatelij protected from
internally genarated mitslea
PAULSON, H Operating Rsacton Branch 3 82/10/12 DIETCHi ft
South rn California Edlsotl Co 33pp 13797 530 24X
Flcht 50-306, 82/10/12,8210200023
B2101S0298 Motif Ication of B2102I meafcing ui/util at plant lite bo
difcuis soil parameters re siiintlc re-evaluation per SEP
Topics II1-& (. 11-4 1
PAUL9DN.W A Opfrailng Reactors BrantJi 3 8E/IO/13 CRUTCHFIELD, D
dp (rating Reactors nnnch S app 15706 133 24X
Fiche SQ-2O6, B2/ 10V 13, 821015027B
S210170417I Bummaru of 921001 meeting w/util in D*theda,MD re scope of
tii-mit rv-evalvation program AiTdl info re vent itcl,
electrical equipment & instrument supports required
PAULBON.H A Operating Hoatton Branch 5 ez/10/13 Opratina
Reictor* Branch 8 Spp IS737 EflH S4K Flch* 50-306,83/10/13,
B210190&71
B2l02fiO"HS Adylis* that s*F etij-grada replacem>nti for commercial grade
jir.ietBT *< traniducir hava bn received & uilll be init*lUd
pi-tor to rfturn to pauar from current outflg* Upgradei
cc-mplete ncirv coirtpl lanc ui/NUREO-0737 r I tim II E 1 2
HABKIN.K. P Southern Caflfornla Edtson Co 83/IO/H
CfiUTCHFIELO, D Operating Reattori Branch S lp, 13806 134, 24X
Fiche- 50-ZQ6, 82/!0/14,82[02A041S
Inspection reports. IE Bulletins t< correspondence
B210010009 Rsiaonds to FOIA requeit for 19 categories of document* r
nuclear reactor events ?, safety problems Forwards document*
listed in App A
FELTON.J H Division of Rules anrf Records B2/0&/2B UDCLL.B A
Critical Man Enerav Project I5pp 15727 005 24V
Flclie 50-000.82/06/28,8210010006
6111191042 Camments on draft IE circular re MSIV failure! to {love
Problem u/cnntrol air for MEIV may be part of larger
spectrum of problems for many valves
MICHELEQN, C Director'* Office 81/10/01 JDRCAN.E L Dlvlilur.
at Resident k Regional Reactor Inspection lp 15730 339 4*
Fiche 90-000, B2/0>/aa,a2 10010008
0310070007 Repond to FOIA request fr eight categories of record r
steam generators t< steam turbines Ap(i A documents provided
in R Ud<ll FDtA Rnuest B1-3I3 Foruiai-ds documents lilted in
App D
PELTOH, J M Division af RuUs and Records B2/OB/1O LONO, D J
Hinthrop, Stlmion, Putnam & Roberta <?pp 1SM5 063 21 X
Ficht 90-OOOj 0B/09/10, B210O70007
8210070139 F-oruiards tabulated data on steam generator insp If nilnt *1
facllltfn Data ihould be provided to licensees
IPPOLITD.T Operating Realtor* Assessment Branch 82/04/01
VAROA,S Operating Reac tnr, Dr^nc-h 1 CLARK. R Operating
Rtactori Branch 3 STOLZ.J Operating Reactors Dranch 4 Spp
15643 131 24X Ficho 30-000, S2/O8/10, 9210070007
DOCKETED ITEMS
21
S2JOO7O172 Forwards info re steam generator integrity ! insps at all
operating PWRs. per 750320 d 21 requests Details of insps,
including defect ind I ca t ions, tube plugging criteria & tubes
plugged uill not be provided eicept for Point Death 1
GDLLER H R Division of Reactor Licensing (NRR-I97S only)
75/Q3/24 HACCARY,fi R Division o^ Technical Review <NHR-1975
only! 5pp 15645 C76 24X Fiche 50-000. 82/O8/ 10, 821007OOO7
:iOCiO2fa4 Forwards IE Insp R B j>t 50-206/B2-24 on 820802-31 No
nanconpl lance noted
BISHDPiT U Division or Resident, Reactor Project '. Engineering
Pregrans B2/O9/17 PAPAY.L T Southern California Edlaon Co
-PO ISil? 307 24* FlcHe 50-206,82/09/17,8210060264
-821006026'? IE Insp Refit 50-206/82-24 on B2OBO2-3I No none omp I lance
no t ed Ma j or areas inspec*ed plant operations during
long-term s hutdoun, annua I review of plant operal t ons, month I y
.ltd ml S surveillance activities & LER follouup
I-11LLER L KIRSCH.D F Division of Resident, Reactor Project t
engineering Prograns 02/09/16 6pp 15^19311 34X
Fit he 5O-206. B2/Q1/I7. B210060264
:iOO6O29'l Foriuards IE Insp Kept 50-206/S2-25 on B20B30-O9Q3 No
nancopipliaoce noted
BISHOP, T H Division of Resident, Reactor Project *. Engineering
Programs 82/09/21 PAPAY.L T Southern California Edison Lo
Spa 15619 223 24x Fichc 30-206, S2/O9/2I , 83I006O294
Z99 IE Insp fiept 3O-306/82-25 on B20830-O9O3 No noncompl lante
ui/seismn upgrading 01 sflfe ty-rel a t ed structures te supports
WAGhcllpU J ZHETZ!G,G B Division of Resident, Reactor Project i.
Engineering Programs B2/09/I7 5pp 15619 335 24X
Fichu SO-206, B2/09/.2I, 8210060394
'IO190232 A<- k receipt of payment of civil penalties imposed on S2GB1I
Pi sposed corrective action mill be examined in future Insp
,,<ElRAD,J f\ Enforcement Staff B2/O9/22 PAPAY, L T Southern
ralitornia Em ion Co 2p p I575B 175 21 X Fiche 50-206,05/09/22,
2 10190^32
1001004; 1 Confirms 02102! r"9t meeting in Rosemeaif.CA to discuss
M i( s tend ' i L assessment of licensee performance Anticipated
mealing att-endees ( agenda encl
CKEW3.J L Division of Resident: Reactor Project (. Engineering
Programs O2/O9/27 PAPAY, L T Southern California Eldison Co
Hpp 15ba5 317 SIX Fiche SO-206: B2/09/27, 0210010043
iO?50302 Foruards info per Hem 3 of IE Oullctin 62-02, "Degradation
or Threaded Fasteners in RCPD of PUR Plants " Rflpts retired
b-j Item 'I uill be suUnitted uitMin 90 days of outage
HrtrNCb. J G Southern California Ediaon Co S2/10/O1 CNGELKCN.R H
Regior ), Orfne of Oiroclor 5pp 1 S790 200 24X
hiche 5O-206. 82/10/01,8210250302
'101BU2JO nctt receipt of 820910 Itr informing NRC of steps taken to
correct .-mlations no'ed in IE Insp Rept 9Q-206/B2-2I
DITiHDP. T W Division of Resident, Reactor Project Ji Engineering
Prograna B2/IO/04 FOGARTV. D J Southern California Edison Co
Ip 15640 OBO 24X Fiche 5O-206, S2/ 10/04, B2100B0210
B?100a3211 DespnnJs to NRC Q208I2 Itr re violations noted in It Insp
Rept 5G-2iJt'/63-3l Corrective actions nonfiro retardant uiood,
o 1 1 1,1 rags i. combustible debris removed from areas d amend to
include emergency light impairment prepared
FDCAHTV J Southern California Edison Co S2/09/10
fNOElKCW.R H Region 5, Office of Director 5pp 15640 OBI 21X
Fiche 30-206, B2/10/04. B2IOOB0210
1OOH0212 Acli receipt of 820907 Itr informing NRC of steps taken to
correct violations noted in IE Insp Rept 50-306/B2-S3
OtSHGF. T II Division of Resident, Reactor Project fc Engineering
Programs B2/10/04 PAPAV.L T Southern California Edison Co Ip
15A3B 08A 24X Fiche 50-206,62/10/04.8210000312
5210080214 Responds to NRC 820B12 Itr re violations noted in It Insp
Rept EO-2O6/BS-23 Corrective actions station procedure
amended to Include instructions on draining reactor coolant
samples From all locations Si double valve verification
PAPAV.L T Southern California Edison Co 82/09/07
ENCELKEN, R H Region 5, Office of Director 3pp 1 S63B OB/ 24X
Ficho 50-306. 62/10/04,0210060212
081<f0233 IS Info Notice BO-35, Suppl 1, "LeaKing & Dislodged 1-125
Implant SeeOs " Svc list encl
CODE. L 1 Division of Fuel Facilities, Materials !< Safeguard)
32/10/06 Consolidated Edison Co of Neiu Vork 6{,ff 13761 2bO
24X Fiche SO-000, 33/1O/O6, 020S190233
0209190233 IE Bulletin 83-O3, "Stress Corrosion Cracking in Thick-
Ual 1, Large-Di ameter, Stain I ess Stee 1 , Rec ircu lation Sys
Piping at BWR Plants " Svc list encl
DEVOONOpR C Director's Office. Office of Inspection and
Enforcement 03/10/14 Consolidated Edison Co of Neu York
115pp 15B10 123 24X Fiche 50-OOO, B3/1Q/ 14, 830819023B
B Reportable occurrenci
LERs {, related correspondence
S2100B0124 Recommends that B10717 event re ignition of gaseous ujaete
decay tank should be considered for Inclusion in NRC third
quarterly AO rept to Congress for 19BI Details of event
enc 1
DRM3TEIN.U L Director's Office Bl/OB/06 MICHELBOH. C
Director's Office 3pp 15fi63 205 24X Fiche 50-206,01/08/06.
B2 10060 124
S21OQ1G008 Responds to F01A request foi 19 categories of documents rff
nuclear reactor event-s t- safety problems Forwards documentSi
listed in App A
FELTDN.J 11- Division of Rules and Records B2/06/3B UDELL, R A
Critical WSBS Energy Project I5pp 15727 005 24X
Fiche 50-000, BH/06/28. 031 001000H
8IOB13026B Foruards details re 010717 ignition of gaseous uas te docny
tank at facility Event should be Included In Commission
third quarterly AO rept; to Congress for 1931
ORNSTEINiH L Director's Office 81/OB/06 MICHELSON, C
Director's Office 3pp 15730 103 24X Flihe 50-000,02/06/28,
B2100I0008
8111300367 Operating Reactor Event Memorandum 81-32 on B10903, control
room operator manually tripped reactor after transient from
887. power initiation bij steam generator flou & level
oscillator Ca-used by ragulated power supply failure
ElSEIJHur.D Q Division of Licensing 01/10/31 VQLLMER, R H
Division of Engineering HANAUEf), S H Division of Human Factors
Safetij HATTSON.R J Division of Safety Technology 9p p
15731 Q3*t 34X Fiche 5O-000, B2/O6/28, H21001000B
B2011501BO Forwards draft TR notice re 910903 AO on failure of hinh
pressure safety injection sys
DIRCKS.W J Office of the Eiecutive Director for Operations
BI/12/OS CHILK.S J Office of the Secretary af the Commission
9pp 19732 007 3-JX Fiche 50-000. 82/06/20' 8210OIOOOH
8210010360 PNO-V-82-038A on, 820922. one truckload of trace contaminatO<l
sewage dumped at Log Angeles County seuage treatment
facility Contamination found In rinse truck Truck returned
to licensee for ducantami nation Addl sample* luill be taken
VUHAS.Q . UENELAWSKI.F Region 3, Office of Director 82/O9/34
Ip 15574 093 24X Ficne 50-206, S3/O9/24, 6310010260
6210190490 Foruards revised LER. 81-Q25/Q1X-2 Detailed event analynin
one 1
RAV, D Southern California Edison Co 82/10/06 ENffELKEN, fi, 11
Region 5. Office o* Director 2jip 15739 335 34X
Fiche 50-306,02/10/06,0210190490
0210190504, Reviled LER 81-Q25/01X-2 on 01 1039, uih i le conducting to 11
shutdown valv testing, ball valve CV-534 did not close
automatically on Isolation signal Gauged by failed relay
doling circuit of each valve Relays replaced
RAY, H B Southern California Ediaon Co B2/IO/06 Re
Office of Director Ip 15739 337 24 X Fiche 30-306, BS
B2 1 0190490
Q210230SQO RO 82-025 on S21013 b 13, Hre watch patrol posted
lubrication oil reservoir area but not at post Time ptriod
exceeded l~h Interval by 30 minutes Caused by personnel
miiundirstand ing
RAY,H D Southern California Edison Co 83/10/14 ENuEU
Region 5, Offio of Director 2pp 19791 096 24X
Fiche 50-2O6, Q2/IO/14, B21O2502BO
8210280066 Forwards LER B2-O23/03L-0 Detailed event analuti*
RAV.H B Southern California Ediion Co 82/10/19 EN ELK
Region 5, Offict of Director 3pp i 5B37 B49 24X
Fich 50-206,82/10/19,8210280066
0210200049 LER B2-033/03L-Q on 880?l9iflre water crosstie d
during n>u const activities Caused by incorrect const
digging praetis Uest fire water puma returned to vc Back
fire iuppreion hoes rigged
RAY, H D. Southern California Edison Co 82/10/1-9 fit
Offiee of Dir.ctor Ip 15837 291 S4X Fichu 3O-206. 82
8S103800&6
DOCKETED ITEMS
V Operator Eliminations
6210390316, Forwards "Improvements in Training !t Requal IFication.
Prdorams a Required by Till Action Items I A 2 1 !> I [ Q 4
for Ban Onofre Nuclear Senerating Station-Unit 1." technical
evaluation rept Training programs acceptable
CRUrCHFIELD, D Operating Reactors Branch 5 52/10/36 DIETCH, R
Southern California Edlion Co 3pp L5E934 101 24X
Fiche 50-206, B2/10/24,a3102'to3l6
B210290330 " IraprovemBnts in Training t Hsqual if (cation Programs
Re-quired by TMI Action Items I A 2 1 t II D 4 for San Qnofre
Nuclear Generating Station, Unl t I," technical evaluation
rtpt
Sc 1 ence Ap p 1 ic-atl uns, Inc NflC-03-Ba-<Wi SA1- 186-029- 17
82/OB/17 NRC - No Detailed Affiliation Given 1 3pp
15954 104 24X Fichs 50-306, 03/10/26.8210290316
B21Q190663 Responds to open items re SEP Topi
Considers! innx. " per 830622-23 meetings to
of leismlc re-evaluation program
COUNGIL.U Connecticut Yantee Atomic Pow
CRUTCHFJEtD, D Operating Reactors Branch 5
Fiche 5O-213, 62/09/37,8310190663
c III-6 "Seismic
discuss status
5pp
02/09/27
15739213
~82101<?066B ''Mechanical fc Electrical Equipment Seis
Program, Haddam cl Nuclear Generating Station."
rept
> Stevenson >, Associates 01C132 I B2/06/3O
15738 HIS 24X Fiche 90-313, B3/01/37. B2I 0190663
ic Re-Eva I uat ion
inter im
224pp.
8210070010) Forwards summary of SEP topics for which facility dues net
meet current licensing acceptance rritena
CflUTCHFlGLB. D Operating Reactors Qranth 5 G3/0<?/30 COUNGILiHO
Connecticut Yankee Atomic Poue r Co 45pp 1562B 032 S4X
Fiche 50-213. 92/09/30, 8910O7OOI
DOCKET 50-20B COLUMBIA UN1V RESEARCH REACTOR
P Operating license stag* documents & correspondence
83102903-09 Advie that reactor has never been fueled or operated
Fuel not on campus No plans to attlvati reactor in near
future Rsques.l variance to 10CFR50. App E retirements until
anticipated r sac tor startup
MEuKOfJlAN-E Columbia Univ H2/10/13 DEMTDM, M FI Offiea of
Nucli-ar KeactoT RaguUtion. Director Ip 1 5953 I6b SW
Fiche 50-2O3. B2/10/12, 3210390309
DOCKET 50-213 KAODAM NECK PLAMT
P QpBrating licerm ataje documin-ti *> Eorrespondence
8209300324 Fovuarda "G-e-olog i cal b Seiimalog ical Btud i BSi Hiddam Neck
Njcliar Station, Part I Hcipanitt to 1979 NIC In fa Flequest"
&. "Part II Reiponiei to 199! NIC Info Riquetti " in rc-iponta
to BEH Topics II-4 k II-4
COUNSIt.lJ O Connecticut Vant** Atomic Pouar Co BS/09/22,
CRUTCHFIELD.O Operatinfl Raactort Branch 5 2pp 13557-179 24X
Flch 50-213, B2/0?/22,S2093CX1326
--82093Q0332 "Oeologlcal I* Senmo 1 agica 1 Studies. Haddam Ned Wuclear
Station. Part 1 fleaponjes to 1979 NF1C Info Req.uit "
Twelve overslti- figure) ert 1 Aperture cardt are ivallJbl"
in PDH
* Western Oeophi/iUal, B3/07/30 194pp 13537 101 B4X
Fiche 5O-al3. 62/09/32.020^300336
8209300336 "OeologUal ! 3t i tmalogica 1 Stud l B*. Haddam Neck Nuclear
Statmn, Par t II Responses to 1731 NRC Info Ra quest "
Mine Dve*ile Figures encl Aperture card* are available in
PDH
* Ucitac-n Otophyllcal B2/07/30 117pp 15558 0|4 24X
B2100I02O7 Forwards "Hadilam Heck Plant Procsdjrs AOP 3 a-sa-C RGB
Wanting or tJoncondenstbli SBCII" b "llflUtoni Nuclear Power-
station RCS Venting Procedure OP B398, " In reipan** to THI
Action Plan I tm II B 1. "RCS Hijh Point Vent "
COUNEIL. H 0, Connrtticut y*nki* Atomic Power Co CQUNBIL. H
Narthsait Nue Imtr Enargij Co dubs at Nortrheait UtH(tte*
CQUNSIL. H 0, North. SB* Utilltisi 82/09/22 CRUTCHFIELD, D
Operating Ractori Branch 5 CLARKiFl A Operating RtictoM Dr-anch
3 3pp 1S56B 04Q S4X FUhe 90-000,02/09/22,3210010207
B210CH0210 Revitlon 5 to "Haddan Week plant Procedure AOP 3 2-22-C HCli
Vgrxting of Naneondonalb le Oasti "
* Connecticut VanLge Atonic Power Co, 02/00/26, llpp
15S6B 031 H4X FieJia 50-000, B3/09/S2,B21 0010507
B2100102M Reviiion 2 to "Millitona Nuclear Poiusr Station Unit 2 Plant
Procedure OP E39B flCS Vsntinj Proodura "
SCAC>S E Nortlmst Nucliar Energy CD <iubi of Northeait
Ut 1 1 i tts ) 82/OB/2Q llpp 15566' OiE 24X
Fich. 50-000,B2/Of/22,BBHMI0307
6210010312 R*nutiti that proceiting of BE0612 license amind 4p*lic>tlon
ba poftponiil Revl**d *pplictin changing radiological
affluent Tech Spaci ulll be docketvd on or about 821115 for
both f-acilltlai
COUNBIL, W Cornectfcut Ynfce Atomic Pauer Co COUNBIL.H 0.
Northtatt Nocltar Enarg^ Co Ciubt of NortJiiait UtiUtdi)
CCUMalL.W Northaait Utlllttei fi2/OT/E2 CLARK. R A Operating
Reacbor Branch 3 CRUTCKFIELDrD, Opiriti ng RiactoM Branch 9
3p P 1S374 047. Z1K Fieht 50-000.82/09/88.8210010312
B2I013033I Disco*i revision of admi ni stcati ve proc orturet to
incorporate revised uorMng hour guidelines t, pruvisiant
for author 1 1 ing deviations per 020309 !> 0615 requests. TMI
Item 1 A 1 3, "Shift Manning" - Oener ic Utr 82-12
COUN9IUU . CAQNETTA. d P Northeast Wuc 1 ear Enorjij Co (iubs uf
Mortheast Utilities) CDl/HSlL, W Connecticut Vflnkeo Atimiii f'ouiEr
Co B2/10/01 EISENHUT,!) C Division of Licensing 3pp
15679 127 24X Ficho SO-OOO. B3/IO/OI , B21OI 30331
S21007O404 Advices that review indicates requirements of HMEO-Q1J7
I turns IIE424*[[E4Z7re containmenl isolation
dtpendab 1 1 1 tu have tieen met
CRUTCHF1ELD. D Operating Reactors Branch 3 83/1O/04 COUNfilL.Ut
Connecticut V an kee Atomic Pouer Co 3pp 19633 314 31X
Flcho 50-213, 93/10/04,821007040'*
8310130294 Forwards "Haddam Neck Plant Seismic Doaigin" tochnical
evaluation re pt
CBUTCHFJEt-D, D Operating llegctors Branch 9
COUNSIL.IJ Connecticut Yankee Atomic Power
24X Fiche 50-213,02/10/04.8210120396
FIN A-6436 02/lu/Oi
Co 44np 1569-1 2<Jl
B2I012&30Q "Haddam Nock Plant Seismic Design." technical evaluation
rept
DHICOES^T U , DUSCII.S U , MDnTON.I) K EOtO. Inc FIN A-A4i>6
EOG-EA-AOlfa D2/00/31 CKEHG, T Divifllon of Licensing I'U'lpo
15654 293 24X Flche 5O-213, B2/10/O1.
D210I30305 Foruards aafeti; evaluation of NUDEO-0737, TMI Action Urn
II E 1 Si "AujlHarg rediuiiter Byi Automatic Initiation t
Flou Indication CF-16p F-l 7}, Haddam Neck Plant, " technical
evaluation rept
CltUTCHFIELD.D Operating Dsactnrt Branch 5 Q2/10/03 CQUWail .U Q
Connecticut Yank<( Atomic Pouier Co 6pp 156T) 37] 24X
Fiche 30-213,82/10/09,0210130205
BSOB1TO17B "Auxiliflri) Feedwatar Automatic I ni tiat ion t- flnu IndiciUt
HutfiJa Nvck Plant," technical evaluation rapt
KAUCHER.JE , FCOTNEfi, K Franklin Institute/Frank 1 In Heiearrh
Centor NflC-03-79-llB TER-C5E37-a94 B2/OP/17 KCNDALL.fi .
WIODO(i,M NHC -No Detailed Affiliation Olven I6pp S3675 '-lir
24X Fltht 30-213.82/10/05,0210130303
BE1Q1303S6 Comttuntt on proposed scape of Phase III of SEP ai re^lnttl
in Individual topic definition* appended to BSOfO'/ Itr
Staff (ncourji jed to develop li Implement means to incorporate
poittlve attrlhutti of Phase III In 1 1 cenaee/NRC Interface
KACICH.R H BEP Burners Group Q2/10/07 EISENHUT.D Biwlnon e t
Licanslng 7pp 1S6B2 179 24H Fiche 30-000, B2/IO/07, BS1OI 303Ji
6210210326 Foruardi tafstij evaluation at licensee safely tiitumi-rH ai
SEP Topic III-3 A, "Effects of Pipe Break on Structures, But,
tc Comjionnt> Inildr Containment " Methodolnpg t- acceptancr
criteria appropriate to resolve Itiuei in tafttij evaluation
CnUTCHFIELD, D Qptratlng Rise tori Drnch S 89/10/12 COUNCIL, W t
Conncbicut Vankee Atomic Pouir Co lOpp 15766 321 21 X
FUhe SO-2I3, 02/10/12,8210310226
6310270200 Foruiardt lummarg of FIRC positions on 26 unresolved al|^
litut*, contii ting of eicirpts from NRC publications & reptt
to Congreis & aiiestment of generic app Hcabtlltu, AJ*nu*tr
bailsi aiist* to warrant continued plant opuration
COUN3IL.H , DPEKA-J F Connecticut Yankee Atomic Poutr Co
COUWaiL.W Horthtait Huqlaar Energy Co dubi of Northtait
Utllltiti) B2/10/13 CRUTCHFIELD, D Operating Rector Brarnh S
4Qpp 153S4 334, 24X Fiche 50-000, BS/lO/l 3, 8210370300
33 1 0330363 Forwards "SEP Topic VII-I A, Notation of Rtuctor
SY From M0ntaf*tg Bui for HdJ*m Macli Plant, " final
technical evaluation.
CHUrCHF I ELD, C Operating Reactor* Branch 5 FIN A-64S3
CQUN8IL.U Cannecticut Yank** Atomic Power Co 2pp 19790 lit
DOCKETED ITEMS
23
"SEP Topic VII-l A, Isolation of Realtor Protection Sys From
Honsjfetij Ei|5 for HadiUm Neck Plant," final technical
evaluation
MQRKEJ1, D J . UDY.A C EG10. Inc FIN A-6425 EGC-EA-6033
SS/Q'P/aQ 23pp 157TO 153 21X Fiche 50-213, 03/1O/3Q, S31 0250363
Inspection reports: IE Bulletin;
: arresp ondenc
ZIOO-7OOD7 Responds to FOIA request for eight categories of records re
stead generators & steam turbines App A documents provided
in R Udell FOIA Revest 81-313 Forwards documents listed in
App B
FELTCN. J M Division of Roles and Records 82/00/10 LONG, D J
Winthrop. Stimsnn. P.jtnam 1 Roberts 9pp 15645 063 24X
Fiche 50-000,03/03/10,3210070007
6210070119 Forwards tabulated data on steam generator Insp tt maint at
facilities Data should be provided to licensees
tPPOLITD, T Operating Hedctors Assessment Branch B3/04/01
VAHGA.S Operating Reactors Branch 1 5pp 15645 131 24X
f-irhe 9O- QOO,a2/OS/10, S2I007QO07
E3210O7O1 '3 Forwards info re steam generator integrity t- inaps at all
nperatinj PUHs, per 750330!- 31 requests Details of insps,
including defect ind i ca I ions, tube plugging criteria t- tubes
plugged uill not be provided encept for Point Beach 1
GOLLER, K R Division or Reactor Licensing (NRR-1975 only)
75/03/21 MACCARY.n Fl Division of Technical Review (NHR-1975
only) 5pp 15645 196 24X Fiche 90-000,92/00/10,8310070007
3ZMOO1O332 Ack receipt of B20SI3 Hr informing NRC of steps taken tn
correct violations noted in IE Insp Rept 90-213/83-03
Violation ui 1 1 be rescinad due to misunderstanding re
termina 1 1 on dates of contractor employees
ItrtRTIM. 1 T Division of Engineering & Technical Programs 03/09/23
CGEJbSCL, M G Connecticut Yankee Atomic Pnuier Co 3pp 15569 164
.T-lx FicHe 50-213,33/09/23.8210010333
J10050376 Act receipt oi 82O62B evaluation of SEP Topic 111-3 C,
[nservice Insp of Water Control Structures " No comments
torL-drded
CQUNSILiW C Connecticut Yankee Atomic Power Cn 83/09/24
i IIL'TCHFICLB, D Operating Reactors Branch 5 Ip 15608 376 34X
Fiche 50-an, 03/09/24. B2IOOSO37A
Forwards request For addl info to complete review of BO 11 04
response to IE Bulletin 80-11, "Masonry Hall Design "
R-esponse expected uithin 60 days of 1 tr receipt
".LARH.R A Operating Reactors Branch 3 B2/09/2B COUNBIL, W
( onnec ticut Yankee Atomic Power Co COUNSIL.W Northeast Nuclear
Energy Co (sub* of Northeast Utilities) I3pp 15716 100 24X
Flctie 50-000,02/07/23,3210130699
8210270249 LER BI-OO5/O3L-0 on 810424. unattended ueldirio cables found
running through access In fire barr ier, poss ibly preventing
closure Caused by contractor falling to inspect fire
barriers & falling to provide connectors in cables
TEST, ft I Connecticut Yankee Atomic Pouer Co 81/05/10 Region
I, Philadelphia, Office of the Director (81/03/01) Spy
19633 342 S4X Fiche 50-213, 81/OS/ 10. 0310370315
8310010003 Respond! to FOTA request for 19 categories of documents re
nuclear reactor events t> tafetif problems Forwards document]
listed in App A
FEtrQNiJ M Division of Rules and Records B2/06/2B UDEUL.R A
Critical Mass Energy Project ISpp 1 57H7 003 34X
Fiche 50-000,82/06/28.6310010000
3111180001 Recommends comprehensi v> assessment of plant operating
conditions to determine tpecific predetermined time related
sequences of occurrence to emergence buses SRP should be
rtvlsed re dei9i feature*
A8HE. F Director's Office 81/IQ/li MICHELSON.C Director 's
Office 4pp 15731 049 24 X Fiche 50-000, 03/06/EB,
82101S0132 Forward* LER B2-006/03L-0
CRAVES, R H Connecticut Vanhe* Atomic Paiuer Ca 05/10/O5
HAVWE6.fi C Region 1, Office of Director lj> 15721 277 34X
Flihe 50-213.83/10/03,0210150132
--82I015012B LER 33-OOi/03L-0 on BS0919r emery ency tfc battery bank D.cell
42, found leaking electrolyte through team crack Inep
revealed 11 mare batteries w/cracks in same location Caused
by cell plate eipanslon against jar & battery age
QLlINN.ri D Connecticut Yankee Atomic Power Co 82/10/05
Region 1, Office of Director 2pp 15721 27 B 24 X
Fiche 50-313,02/10/05,8210150123
8210180071 Forwards LER B2-007/03L-0
GRAVES, R H Connecticut Yankee Atomic Pouier Co
HAYWEB,H C Region 1, Office of Director Ip
Fiche 50-313, 83/10/30,3310230071
02/10/20
15B37 347
8310280074 LER B2-007/03L-0 on 830927, opera tor received rod drive sl.ivfl
cyclir failure/rod stop a larm. rendering all bank subgroups
Inoperable Caused by master cycler relay hanging up due to
poor relay contact Mercury wetted contacts reuet
QLMNH, H Connecticut Yankee Atomic Pouer Co 83/10/EO
Region 1, Office of Director Ip, 16337 348 24X
Fiche 50-213,82/10/20,8210230071
DOCKET 50-319 OYSTER CREEK NUCLEAR POUER PLANT
F Security, medical, emergency b tira protection plans
-jBl 90333 IE Info Notice 80-35. Buppl 1, "Leaking (. Dislodged 1-12!)
Implant Seeds " Svc list encl
iOHD,L f Division of Fuel facilities, Materials & Safeguards
Consolidated Edison Co of Now York 66pp 19761 250
SO-000,83/10/06. 0300(90233
Ack receipt of aaOaiE Itr informing NRC of actions taken to
improve emergency preparedness program per IE EmerQencij
Preparedness Appraisal Hpt 50-B19/S2-01
ALLAN- J H Region 1, Office of Director, 02/10/12 FIEDLER, P
General Public Utilities - CPU Snrvlc* Corp 2pp 19776 326 B4X
Fiche 50-319,83/10/12,0310220102
IE QulUtin a2-03. "Stress Corrosion Cractring in Thict-
Wa I 1, Large-Diameter, Stainless Stoe I , Dec ircu la t ion Sy i
Piping at DUR. Plants " Svc list encl
DEYCUNG.R C Director's Office. Office of Inspection and
Enforcement 83/10/14 Consolidated Edison Co of Nflul York
U5pp 15810 125 24X Fichu 50-OOO, 83/1Q/ H, 8308190338
Forwards 1C Insp Rupt 50-213/BE-17 on 830823-0936 No
nnncompliancB noted
ETAFIQSTECm.R Division of Project & Resident Programs B3/10/1S,
COUNSIL.W C Connecticut Yankee Atomic Power Co Spp 15853 3i'J
24)t Fiche SO-213. 83/10/15. 03I029018 1 ?
6210390194 IE Insp Rept 30-213/82-17 on 020053-0936 Ho noncomp 1 Unca
noted Major areas inspected facility tours, log & record
re/ieu. aurvei 1 lance ti containment ent< y
REBELCWSKr, T , ELBASSER, T C Division of Project & Resident
Prosrami 83/10/14 7pp 15B5331S 34X Fiche 90-213, 82/10/13,
02I02901B9
3 Reportablc occurrences. LERs I related correspondence
9210370345 Forwards LER B1-005/03L-0
GRAVES, (I H Connecticut Yankee Atomic Pouier Co 01/05/18 ORIER.D
Region 1, Philadelphia, Office of the Director (01/03/01) la
J3B22 341 24X Fiche 50-213,81/05/18,8210370345
8210330187 Responds to IE Emergency Preparedness Appraisal Rpt
90-819/82-01 Corrective actions training program developed'
emergency control ctr moved away From control room &
ventilation syi upgraded
FIEDLER, P B, General Public Utilities - OPU Service Corp
BZ/OEt/12 SMITH, If Division of Emergency Preparednen 9pp
1377A.330, 34X Ftche 50-319,82/10/12,8210220182
8310250393 Forurd* Revision 13 to physical security plan Revision
withheld
LAOOART.rt H Qeneral Public Utllltit. - OPU Service Corp 83/10/19
Office of Nuclear Reactor Rejulation, Director IP. 15790 136
24X Fiche 50-219.03/10/17,3210290303
H General correspondence
8307180051 FOIA request for seven categories of info re nuclear matl
transported by M Rah In Apr 1900 to BeaHyi NV b General
Public Utlls submissions From 000101 per Price Anderson Act
VAN S YQC, C Tomar, Parfci, Sellgir, Simonof f & Adaurian. 82/00/34
FELTON'J M. Division of Rules anil Records. 2pp 1576O 196 34X
Fich* 50-21*?, 82/06/34, 83O71S0051
8310190163 Partial response to FOIA request for seven categories of
info re nuclear fflitl transported by N Ftoh In Apr 1980 to
6*atty,NV l> Contra! Public Utilt submivsionf lines 800101
per Trice-Anderson Act ra facility Forwards App A documents
FELTON,J M Division of Rules *nd Records. B3/09/15, VAN BYOC.C
Tom*r< Parks, Stllgtri Slmonoff & Adourian 3pp 13740,199 24X
Fleh 50-219,82/09/13.8210190163
24
DOCKETED ITEMS
Operating license stage documinti & ci
0210010063 Inform! that Euan rest Hept XN-NF -78-12. "Spray Codling
Heat Transfer Test Resu I ti, Phase-1 I Facility ti Test Data
EtiC Oi8 DWH Fuel," ui 1 1 be ulthheld per 1QCFR2 790, In
response to S2GBQi> request
CROTCHPIELD. Oparating Heacton Branch 5 03/07/23 FIEDLER, P U
General Public Utilities -CPU ServiieCorp 3pp 15567 167 24*
Firhe 50-219.32/09/22.8210010063
Q210010077 Forwards rlarV I containment long-term program, pi ant-uniqu
analysis repts for suppression chamber vent sys & torus
attached piping Safety relief valve piping analyse
completed !. foruardeil bij 031215
FIEDLER, P B Genera! Public Utilities - GPU Survi
CRUTCKFIELD. D Operating Reac tors Branch 5 2pp
Ficht 3(3-219,62/09/34,6210010077
Jill be
Corp 83/09/34
1554,6 033 21 X
8210010001 "Ouster Creel Nuclear Generating Station Hark I Containment
Long-Term Program. Planl-Unl qu* Analysis Rep t. Suppression
Chamber 1 Vent Eija "
HPH Associates, Inc MPR-733 B2/QB/31 300pp 155ifi 035
24X Fiche SO-219. 92/O9/24, 631 001OO77
--9210010095 "Oyiter Creek Nuclear Cer-erating Station Marl I Containment
Long-Term Progranii P lanl-Unl que Analysis Rept.Taru! Attached
Piping "
HPfl Associates, Inc MPR-734 S2/QS/31 157pp 155fi4 359
24X Fiche 50-219,82/09/2-1,0210010077
B2100402A1 Forwards notice of consideration of issuance of amend to
provisional QL, DPR-1A, re increase in spent Fuel storage
capacity to 2,600 assemblies
CRUTCHFIELD, D Operating Reactors Branch 5
General Public Utilities - G-PU Service Corp
Fiche 50-319,63/09/28,9210040261
B2/09/23 FIEDLER. P D
2pp 15595 003 24X
B2I004Q3A5 Notice of consideration of issuance of amend to provisional
QL.OPR-lfi, re increase in spent fuel storage capacity to
2, 00 asienblies
CRUFCHf IELD.D Operating Reactor* Branch 5 82/09/28 4pp
15595 003 24X Flcne 30-219, B2/09/28, B21O040261
82100BQ043 Foruards 1NPO "Evaluation of Oyster Creek Nuclear eaneratinn
Station." per rioselerj aiOSOi request & Stello G10626 memo
EMITH.G H Dwiiton of Emergency Prparednes 6 Operational Support
B3/09/29 TAVLOR.O H Division of Beactor Programs Ip
15643 037 24* Fiche 50-2J9, B2/0-J/29. 82100B0063
B21&OBD07-7 "Evaluation of Oyster Creel Nuclear Generating Station "
" Institute of Huelsar fouer Operations Hl/12/31 33DD
13643 O3S 24X Fiche 30-21^.1
8310370345 UJFEOflATED PLAWr SAFETV AS5ESStNT, SVSTEMATIC EVALUATION
PROSRA1 Oyster Creel Nuclear Generating Station Docket
50-219 ICPU Mucl.ar Corporation And Jerisu Central Pouer And
Li jht Companv )
Division of Licensing MJREO-OB23 DF1FT 62/09/30 537on
15850 14fi 24X Fiche 30-319, B3/O9/30, S21027O3-43
9210130326 Cufn,ntnts on proposed icope of Phait III of SEP as reflected
In Intfividual topic dafinitlani appended to 92O909 Itr
Staff encouraged to develop (, ioiplemint means to Incdrporata
5S? ri V S *' f P !i a " IH ln '""C interface
ACICH, R M SEP Owners Oroup B2/10/07 EISEWHUT.D C Division of
LIen*lng 7 rf IS6B2 1 79 24X Ftch* 30-000, S2/10/O7, 6310130326
210190502 Advi ie that company no longer performing analyses far It*.
Nuclear supplied fuel under irradiation in plant Util made
separate arrangements Util utiluing or planning to utiHi
fuel for operating conditions outside analyied j. ......
OW5LEV.G F Enon Nuclear Co , I
B2/10/13 RUBENBTEIN.L S A
Systems Ip [5740 196 24
. uf Elian Corp J
istant Director for COTB t f'l-anl
Ficne 50-219, B3/ 10/ 13, 03iQ1105CiJ
210200040 Foruards corrected FR notice of c ons idoral ion of amend
License DPR- 1 6 r ipent fuel storage cnpacity published
B2100B, reflec t ing B2I10S as deadline For requesting hearing
CRUrCliriELD, D Operating Reactors llranch S [tS/lO/ll MTLDIFI
General Pub lie Utilities - GPU iiorvicuCorp 4pp 15757 ,'Uf,
Fiche 50-219,32/10/13.6210200060
8210S601B3 Foruards Amend 63 to License DPR- 1 A, safety 8VJl nat LHII
notice of issuance ' aval labi 1 1 tij Amend anthoritcs addition
of control rod drive scram discharge vo 1 high lovel 6 roif
block to Tech Spues
CRUTCHF1ELD, D Operating Reaclois Hranch 5 02/10/15 riEGU
General Public Utilities - GPU Service Cnrp 2pp J"iW) .' !ll
Fiche 50-219. 62/10/15, B210260IB2
--Q21026Q1B5 Amnil i3 to License DPR-1 6, authon j i ng addition of CCIII)T;|
rotf drive scram discharge vul high level d sci am trip bifpiii i
rod block to Tech Specs
CfiurCHriELD.D Operating Reactors llranch 5 H^/10/]5 :',ip
15803 235 24X Fiche SO-E1?, B2/1O/ IS. OHI
,'ff
S210240IB7 Safety evaluation supporting Amend 6') to LitoiiiO fH'W
Otfice of Huclear Reactor Oegulalion, Director
13B03 241 24X Fitho 50-21?, B2/10/ I 5, E12 103ft{)ltf2
B202010167 "Technical Evaluation Rept for BWR Scram RiBCh.irnc Uw I
Lonj-Tenn Moil) Oyster Ci eck Nuclear Generating Station "
KUCHA, E Franklin Ins 1 1 tute/Frankl in Research Center
Nf)C-03-BI-I30 TEfJ-C 5506-50 02/01/27 bTCLrbTON, K Hill I
Detailed Affiliation Given 53pn 15000 34'1 24X
FlcJie SO-2C?.g2/10/15, 0210260103
iilability of Amend {,'.} in t iirn><r
8210260191 Notice of issuance
DPR- 16
CRUTCHFIELD, D Operat i ng Hcac toi s Branch 5 U3/IO/15
15Q03 SIB 24K Fiche 50-219. D2/IO/ I 5, fl21 02601H2
82102102QO Submits addl comments on GCP Chase II During final
of BEP.NRC properly h effectively asiessed oafuty intent of
SRPs & evaluated merits of alternative proposals
CLARK. P R General Puo 1 1 c Utilities - CPU GBTVICD Carp
CRUTCHFIELD, D pperating Roactoia Branch 5 2pp 13/69 1 4-H i?1
Fiche 50-219. t!2/10/ IB, 6210210280
8310250136 Foruartfs info re reactor protection Eys pouipr supnlij.u.
response to Q20702 reiiuest for aifdl info Periodic
Functional testing will be performed on assemblies by
removing motor generator set from distribution bun
FIEDLER, P B General Public Utilities - QfMJ Sorvire Corp (KVKVIu
CRUICHFIELD, D Operating Heac tors Branch 3 2pn 1 37f]7 003 [!**
Fiche 30-219, H2/I O/ 13. B2IO2S0136
8210230189 Requests approval qf Tech Spec Change noaust m r* 4*4u* L ,
of station electric distribution sys voltan*5 ** degraded
arid protectio-n for Class IE power sys, in rBiponao to OlIOlo
Itrs Voltage regulators provide no safety function
F 1^!'' P Q Bni ' rfll Public Utilities - GPU Service Corp fia/JO/JB
CRUTCHFIEUD, D Operating Reactors Brunch S Snn 19700 Pfl/i C4J
Fiche 50-319, B2/IO/10,a210250IQ9
o 9ubmitl correction, to discrepancies identified In util
821003 Itr re control room habitabllity Onp Oversije
draulnn enc 1 rtperturo card is available in PDR
, 0nral Pun lie utilities - OPU Service Corp
tlStNHUT.DG Division of Lie ens Ing Spi\ ISBS3 MSI E-IX
Fiche 50-219,03/10/19,0210290234
8210270202 Advises of reviBu of deviations to stated positions
contained in MJREO-0737, 1 1-* I [ F 1 3, "Containment IHjh
Range Radiation Monitor " Monitors expected to be in. tilled
during Cycle H rsfueling outage
CRUTCHFIELO, D Op. rating Reactors Branch 3 02/10/20 FIEDUH.P
8210250294 Notification of S2M03 mBB tin 9 ui/util in Dethesd.,HO ID
facility"'' 1 *'"" 'P" 3 " 1 "frectivene.. i n ,t,a m Bnv iron at
J ' P Bra t' n B HBactori Branch 5. B2/10/B1
1 Dranch 3 3pp 1S791 17S 3
DOCKETED ITEMS
6^10270004 Advises that response to NUfiEG-0737, 1 tern II K 3 35, "Effect
of Lou of AC Power an Pump Seals," ace ep ta b le. based on
endorserrenfc of BWH owners group position Mods to seal
cooling For r ec ircula t ion pumps not required
CRUTCHFIELD, J> Operating Reactors Branch 3 02/10/22 FIEDLER. P D
General Public Utilities - GPU Service Corp 7pp 15015 353 24X
Ftch* 50-219.02/10/22,8210270004
3210330187 Responds to IE Emergency Preparedness Appraisal Bept
50-21 9/B3-0 I Corrective actions training program developed,
emergency control c tr moved auau From control room t*
venti lation igi upgraded
FIEDLER, P B General Public Utilities - GPU Servica Corp
82/09/12 SMITH. H Division of Emergency Preparndness 9p p
15776 330 2flX Fiche 50-319, 02/1O/ 12, B21032OIH3
U2IOO80015 Addl response to FQIA request for 19 categories of info re
nLrrlear reactor events V safety problems Forwards documents
listed in App A Documents in App D completely withheld Iref
FDCA Exemption 5)
FLLTON, J M Division of Rules and Records 02/O7/12 UDELL, H A
critical (lass Energy Project 9pp 15465 027 34X
Fiche 50-QOQ, SS/07/12.B2100B0015
--Q2100SO140 Systematic assessment of luensee performance notes re
facility evaluation for Auq 19/9-Jul 1980
J NRC - Mo Detailed Affiliation Given BO/07/31 7pp
13668 OOB 24X Firhe 5O-OQO. B3/07/ IS. f]21 QOH001 5
820B190238 IE Bulletin 82-03, "Stress Corrosion CracHnc. in Thitk-
Uall, Large-Diameter, Stainleti Steel. Hue irtu latiorv Syi
Piping at BWR Plants " Svc list end
DEYOUNG.H C Director's Office. Office of Inspection and
Enforcement H2/ID/14 Consolidated Edison Co of Haw Vork
llSpp 15310 135 24X Fiche 50-000.62/10/14.8303190330
S Reportable occurrences, LEFIs tr related correspondence
8210070438 Forwards ang ineerinj evaluation rept on 010827 shutdown
cooling sys HX failure Failures diagnosd as
fatigue failures due to floui induced vibration Event not
considered flO Repairs lo be complete bij 911012
LrtMIK.O Director 's Office Bl/10/15 Direc tor 's Of t ice 7pp
15637337 SIXFiche 5O-219, SI /1O/15, 8210070438
921007036B Forwards IE Insp Hept 50-219/03-20 on 820BQ3-G907 !. notice
or via 1 a (. irjn
STAR-OSTECKI., R Division of Project & Resident Programs 03/09/2.2
FIEDLER, P D General Public Utilities - GPU Service Corp 2pp
15634 1-IB 2-JX Ficfia 50-219,02/09/22,8310070269
-f32lOO7O27D Notice of violation from insp on 030003-0907
" Division of Project t- Resident Programs 92/09/22 Ip
lSb33 ISO 24X Fiche 50-219,82/09/22.0310070268
--HP1007QU75 IE Insp Rept 50-219/B2-2O on EJ20GQ3-0907 Noncomp I i anc B
noted failure to folloiu equipment control procedures t,
prepare procedures consistent W/1GCFR20 for work involving
personnel radiation exposure
COUCILL.C . THOMAS. J . TRIPP.L E Divialon of Project t- Resident
Programs B2/09/17 lOpp 15634 111 31Xriche 50-219, 82/09/22,
OS 1 007026O
Foruards IE Insp Hept 50-219/02-19 on 020B03-06 No
TioncoiTpliatite noted
MART IN, T T Division of Fngineerlng fc Tecdnlcal Programs B3/09/24
FIEtli-ER. P 13 General Public Utilities - GPU Service Corp 2pp
1563-1 092 2AV Tiche 50-219, 02/09/24. 321O07O34J
-t33[QQ7Q345 IE Insp Rept 50-219/03-19 an 330002-06 No none omp I lane o
noted Hajor areas inspected 1 ICCISBB action on previous map
f inri i ngs , ra d la tion protection instrument calihr (. training,
pasting, labeling. ALrtRrt program ti rad waste program
liRAY.J Fl , RdUE.C rt . GFIECNHAN. C G Division of Cnglnaermg !.
rachnlcal Programs B2/09/23 lpp 15634 094 24X
Fiche 50-319. 02/09/24,8210070341
"2OBI90333 IE Info Notice 80-35. Suppl 1, "Leaning ti Dislodged I-12"i
Implant Seeds " Svc list pnci
CDBB, L I Division of Fuel Facilities. Materials % Safeguards
B2/IO/06 Consolidated Edison Co of Neu Vork 66pp 15761 350
24/ Fiche- 50-O
(-210250205 Rsquests relief from insp of listed uields using volumetric
>, surface eiam methods Results of review of inservice insp
program requirements fc justification for relief in
inspecting 10 dissimilar metal wolds end
FIEDLER. P B General Public Utilities - GPU Service Corp 03/10/00
CHUrCHFIEL.!), D Operating fieac tors Branch 5 3pp 15791 172 24X
Fichff 50-219,93/10/00,0310250209
e2iOl<?0375 Acfc receipt nf B20B31 1 tr Informing NF1C of steps taten to
correct violations noted in IE Insp Rept 3O-2I9/8O-17
MrtRTNJ, T T Division of Engineering !. Technical Programs 02/10/12
FIEDLERS n Oeneral Public Utilities - GPU Service Corp Spp
15711 O]7 24X Fiche 50-219,02/10/13.8210190375
--SS10i9039B Hsponds to NRC 920116 1 tr re violations noted in IE Insp
Rept 30-ai9/SO-l7 Corrective actions OA audit insp program
of health physics activities implemented b training i-
definitions of radiation protection staff improved
FIEDI-ER.P II Qsnarol Public Utilities - QPU Service Corp
02/03/31 SMITH.G W Division of Emergency Preparedness k
Operational Support 15pp 15741 019 24X Fiche 90-219, 93/10/13.
B21-019037B
5210220132 Ac k receipt of Q20012 1 tr informing NRC of action* taken to
improve emergency preparedness program par IE Emergency
Prepare dnes* Appraisal Rept 30-21 9/B2-01
ALUAN, J M Region ), Office of Director B2/10/1B FIEDLER, P D
General Public Utilitm - GPU Service Corp Spf 13776 338 24X
Fiche 5-Q-S19, 02/10/13,0210230102
8210010008 Responds to FOIA renuest for 19 categories of documents ro
nuclear reactor events !< safetg problems Forwards documents
1 lted In App A
FE(,TON, J M Division of Hides and Records 82/Oi/as UDELL. R A
Critical rfass Energy Project 15pp 15727 005 34X
Fiche 50-000,93/06/28.8210010000
B1102300S5 Forwards- enginoering evaluation rept on shutdown cooling sy
HX failures which occurred in late Aug 1981 Failures
diagnosed at fatigue failures due to flou Induced vibration
Recommends event not be considered AO
LANIK, G F NRC - Mo Detailed Affiliation Given 01/10/19 NHC
- Mo Detailed Affiliation Given 7pp 15731 012 SAX
Fiche 50-000, 93/06/20, 021 0010DOB
0310130167 Ho on B20B14, normo 1 shutdown initiated to investigate higher
than normal dlfterentlal pressure readings in emergency svc
water sifs Caused bij debris blockage consisting of live !
dead animal matter Organisms removed & tubes cleaned
FIEDLER, P D General Public Utilities - GPU Service Corp 02/09/23
HAVNES.R C Region 1. Office of Director 4pp 15673049 34X
Fiche 50-217,82/09/33, 0210130167
0310070178 Forwards LEFi 83-04<?/03L-0 Detailed event analysis enc)
FIEDLER, P D Oeneral Public Utilities - GPU Service Carp B3/09/H4
HAVMF3,fl C Region lr Office of Director 3pp 15634 290 S4X
FichB 50-219, SS/09/S-t,B21007017fl
02100701B1 LER 02-049/03L-0 on 030839, seven hijdraiflic anuoiors failed
functional teiting after feeing, r-eplaceil bi; certified
functional spare! Two snubbers had improper matl seal*
Caused bij seal degradation tc/or worn poppet valves
CHARTERINAi J Oeneral Public Utilities - GPU Service Corp
82/09/34 Region I, Office of Director Ip 15634 301 2<1X
Fiche 30-319,02/09/24,8310070170
8210070330 Forwards LEtt B2-04B/03L-O Detailed avent analusis e
FIEDLER. P D General Public Utilities - OPU Service Corp
HAYNES, R C Region 1. Office of Director 3pp 19637 151
Fiche 50-219, Ba/09/27. 9210070236
0310070341 LER B3-04S/0>3L-0 on 020S26. reactor water level
instrument* tton for ont channel in each of several safety
igi randered inoperable as result oF loss of ret column
head
RIOOLE, E I General Public Utilities - OPU Bar vice Corp
02/09/37 Region 1. OfPita of Director Ip !5<b37 134 3-IX
Fiche 50-319, B2/09/27, B31O07023S
8210130357 RO on S2QB29. reactor startup conducted w/ inoperable rad
worth mlnimlier Hlnlmiier fal)*d due to defective clod
drive module In slot 4J of CPU unit, damagingi several
component* All damaged components rep laced
FIEDLER. P B Oeneral Public Utilities - OPU Service Corp 03/09/HB
HAVNES.H C Region I. Office of Director Spp 19679 010 H4K
Fiche 30-219. B3/09/20. 0210130357
0310060376 PNO-l-fl2-OA3 on Q210QI , anonumous phone caller notified
licensee that bomb uaf set to go off In plant No bomb
discovered in protected area
COWOTLL, C , TfiIPP, MCCABE Region 1, Office, of Director. B2/10/01
Ip 15619055 24X Fiche 50-319, S3/10/01. 8210060376
8210150090 Forward* LER B2-050/03L-0 DttnUeif event analuiit encl
FIEDLER, P Oeneral Public Utilities - OPU Service Corp 82/IO/O1
HAYNES.R C Region fi Office of Director 3pp I570J 170 24X
Fiche 50-219,82/10/01,8210150099
26
DOCKETED ITEMS
9210150113 LER B2-050/O3L-0 on 620623, reactor vesml prrsiur L led in
i ict 11 of I 1O fits u/Ttactor water temp greater than 212 F
Caused bu inadequate Procedure A02 4 001 Teft procedure ulll
bi reviewed to redefine temp/fret jure requirement*
SAWTELLA.A General PuHir Utilities - OPU Service Corp
S2/10/01 Rejion 1. Office of Director Ip I57O1 1BI 34X
FUh 50-219-03/10/01. 82lDlSOO=p0
P Operating license stage documents ft correc pondonct
8310050514 Approves r ecircu lation B
prior to safe-end r (placem-ont
VASSALLO, D S Operdting Reactors
Niagara Mohaul Power Corp 3pp
FichB 50-230. B3/09/02,B21QQ50QI4
Tomoval Info
Branch 2
15634 OSO
B2/09/02
24*
DOCKET 50-220 WINE fULE POINT HUCLEAR ^
F Securjtu. medical, aiierger-cu t firs protection plans
S3I001Q275 Forward* "Su,tetn.tic Assessment oF Licentee Performance
ISALPl.Nine Mil* Point Nuclear Station Lftil t I." for May I?3I
-Anr l9B3,utll B2Q73B Itr re performance improvements A NHC
920630 request (-it of SftLP 630700 meetmj attendees end
HAVNES.R i Region 1, Office of Director 62/09/38 RHODE, K
Niagara rtahiul Power Corp 4pp- 15548 337 24X
Fiehe 50-220, 82 J '0?/2Q,B210010273
--B2100102BO "Su,s-t*fntlc Alignment of Licensee Per formance, Nina rllle
point nuclear Station Unit 1," for flay 19Bl-Apr 1983
Ragion 1, DFfict. of Director 32^06/29 27j>p 1 35iS 331 24X
Fiche 50-220,62/07/^0, B2I001&a7S
83IOOC.O303 Atii receipt of 93033-1 Ur informing NRG of ttepi talcen to
improve Ittmi li(3itlfld tn Af? t A, 13 8. C of IE Emergency
FTparedni flppraiia! npt 30-320/Q1-JB
SMITH, C H Division n-F EmTg*ncv Preparedness 6 Bperational Support
B2/09X29 RUDBE'O . Niajjara Mortaul Poue-p Carp 2pp 13il4 01B
24X Fiche 50-8a0.e3/0?/a9BEI0060203
S2I006020S Respondt to HOC B30222 Itr trajis mitt ing IE Emergency
Freparerfne!! ApprainI Rept 50-230/01-10 Description* of
jfisstnutnt/icUons (a be taktn for impravina Items
identified In Appi A> Q t C of reft end
LGMPOES. T Nlagar* Mohawk Pouer Corp 82/03/34 HflVHES, R C
Rfjion I. Office df Director 22pp 13614 020 24 X
Fiche SO-220, 02/09/2 1 ?, Q23CO60203
Forwards revleu of safe ihntdoun an*lg!U in reipans to
B2042& requeit for add I Info rt 10CFRBO,Cipp R,3ectiDn>
III ! Ill L DC *iit 129-valt anal^lls for brtalar fuse
coordination to be completed bij 821231
JWWAN, C V Niagara Hnhaul Poutr Corp, B2/10/01 VASSftU.0, B D
Operating Reactors Branch 2 lj> 19994 001 24X
Fich 50-SSOj 82/10/01, 8210040296
8210040303 ftp p R revnu of s*fe ihutdDLin analylli-
* Niagara Hob'ut Pwir Corp 2/10/01 44ij>p
Fittit SO-220, 02/10/01. B3I00402W
tS59A 003 SIX
9210050-083 FortLtarifi "Dupersian Modil Doicr ip 1 1 on for Ulnt Hile Potfity
Jamvt A Fitip*trcl Wuclur Stations, " upgraded
metOrolojic 1 (JI de-sCription p(r TH-I Action ltn III A 2
DflVWE, J P Pou.r Authority oF the Statr of Nu Yart B3/1O/OI
VASSALLO, D D Operating Realtors Branch S 2pp 13604 233 H4X
Fiehe 50-333j sa/10/Dl. B2IOOMOS3
S310I20632 Aflvi jes that S00421 request For title change of
vlce-prei iden t cloied out uncc ut I ! advised change no
longer required
VASSflLLO, D B aporaliifl Reactors Blanch 2 B3/09/17 J}J'3f., I) 4"
Niagara rlohaul Power Carp 2pp 15672 271 21X
Fiche 50-330, B3/O9/1 7. B2lOI20i33
82lOO'l0033 3utmil Info re removal * rep laccmont of rcattor
recirculdtion *u piping. per B20922 r*nuB3 I Combined
man rem eipomri estimates bounded bij original estimate nf
2.90i man ram
NflNCAW. C V Niagara Hahauik Pouer Corp B2/O9/27 EIBENJUT, P C!
Diviiion of Licensing 3pp I 3 Si 5 I 70 24X Tithe 50 22O, II,V(IV
B3 1 00 1 0033
re canta i nment
of HURCQ-Q73f &
program Fee
B2I0040H7 Foruards fae for tech Spec change
dependabil I tij [n compl lance u/rcqu I remcnts
reactor ret i rcula 1 1 on safe-end rap I acements
submittal in response to NflC B30S25 Itr
tWMGAN, C V Niagara Hohaut Power Corp 82/09/27 OIGQin i( lituntf
Fee Msnageraent Branef. 2p(f ISSBI IB? 24X Ficho SO-?JO, IU HVIf.'l,
B21D040I17
&2I00401B2 Fartuards "Nine Mile Point Unit I Station Power Disli ihntion
Sji (CUss IE) Luad Stud^ ti Field Test," in response tn Mlir
9 1 0202 reiuest Required motor rewinding i- cabin rep I acemBJil.
vii.ll tm performad during neit scheduled refueling outage
LEMPOES, T E Niagara (Inhauf* Power Corp B2/O9/27 VAB'iAINJ.II U
Operating Realtors Branch 2 3pp 15382 306 3-1X
Flche, 50-220. B2/09/27. B3IOO'1(11Q3
--B210010183 "fline Mila Point Unit 1 Station Power Distribu t inn 'm*
(Class IE) Load Studi/ !. Field Test "
DLASIfiK.L J , IflOEIJIO. J . LAIRD, ft C Niagara rloliauih Cow or I nrp
ffl/13/10 96pp 15502 210- 24X fiche 50 220, OSfOf/'Jf. fl.'l (HUfJllW
S3IOOI027S Foruartl! "Eijstematir Assessment of Licensee Pci f or-n.nn
<BAl.Pl.Nine HUB Point Nuclear Station Unit 1." for Mag I "7111
-Apr 1982,11111 EJ307SS Itr re performance improvements d NIK.
02O630 requtit List of SAUP 020706 meeting attendees end
HAVHES, R C RegiDn I. Office of Director O2/09/3H RHUUI , U
Nlao*r Hohawk power Corp 4pp 1556H 327 34X
Flche 50-230, 82/07/23. B21QQ10S75
92100102GO "Systematic Assessment of Licensee PBrformancp, Nlnu Mil*
Point Nuclear- Station Unit 1." fur Hay 1901-rtpr 1103
Rajion 1, office of Btrector 82/06/3S 37pp 15560 -I'M *Mi
Fiche 50-22-0, BS/09/3S. 8310010275
931.0010297 Responds to radiological controls section of
njctamatlc asiennant of Hceniee performance refit
Commitments for performance improvements provided
LEMPOES, T E Niagara Mohawk Power Corp 82/Q7/3B STAIOf, TKM . Ft
Division of Project t. Reldnt Projrams 4pp 155MI 350 i'tlf
FUhe SO-230. B2/09/2B, 3310010375
--B2 1 001 0294 Inform, of 830703 meeting at site to dist.uss NflC U'.
igltematic allotment of llcBmie performanca Ducunlon of
tfforts re raiJ 1 oloj ical control activltioi should be
prepared
ETAROBTECKr.R Division of Project b Resident Pragrams
LEMPOEB, T G Niagara Mohaufc Ppuier Corp 3pp I356B 3/i2 IMK
FichB 30-320, B3/O9/2ff, 8210010279
B2100505iO Foruarili 43 over-in drauinfit shauing connection of
alternate shutdown aijs to normal fhutdouin BUS, In reipons*
to NRC Q2O426 itr Aperture card* ara available in PDR
1WJQAN, C V Niagara rlohaul Pouar Corp B2/09/30 VA8B/M.LO, D
Operating Reactors Branch 2 Ip 15603001 24 X
Fich. 50-220,93/09/30.6210090260
B2100S0394 Notifii* thai propoud mod* to automatic deprnturl latlon
iiji logic uill not he tubmitttd until 821203 Delai| needed to
consider effect*, of lifted analyses
HAWANi C V Niagara Hohtwk pauer Carp G2/09/30 EIBENHUT. ft
Olvllion af Liceniing Ip ISiOi 348 24X FichB 50-220,03/09/31?
B2 100503 34
B2100S0111 Foruird* one ovartite revisvd ichadule for rec ircula 1 1 o
nji repairs at fac i 1 Ittf- Apertor card is available in PDH
HAKSrtHrC V Niagara Mohaut pouer Corp 02/10/01 VA3SALLO- J) D
Operating Reactor* Branch 2 Ip 15403 002 24X
Fiche- SO- 220, 82/10/01, 0810050111
DOCKETED ITEMS
27
3210130107 Submit* addl Info to B 20 927 Itr re analysis criteria far
recircu lation sijs piping replacement Reanalysis criteria
provides tame margin at original criteria High anergy line
breal would not affect engineered safeguard sys
MANtWJ.C V Niagara He-haul Power Corp B2/IO/05 EISENHUT, D Q
Division of Licensing 3pp 15673 1O1 24X Fiche 5O-220, 03/10/05,
Q210130107
8210380144 Informs that review of technical evaluation rent,
"Comparison of Plant & Model Radiological Effluent Tech
Speo t- Plant OffsitB Dose Calculation Manual. Nine Mile
Point Nuclear Station Unit 1," will be completed by 02)130
LEMPGES, T G Niagara Mohauk Pnuer Corp 03/10/25 VAS9ALLO, D D
Operating Reactors Dranch 2 lp I5B37 135 24X
Fiche 50-230, 82/10/25. 82IQ2B014't
Inspection reports' IE Bulletins b correspondence
6310080015 Addl response to FOIA requust for 19 categories of infn re
nuclear reactor events & safety problems Forward a documents
listed in App A Documents In App D completely withheld (ref
FOIA Ejemption 5)
FEU TON. J H Division of Rules and Records 82/07/12 UDELL-H A
Critical Mass Energy Project fff 15665 027 34X
Fiche 50-000.02/07/13,0210000019
--3210030107 Systematic assessment of licensee performance notes re
facility evaluation for Fab 1 930-Oc t !<?B1
* NSC - No Detailed Affiliation Given 81/O1/31 3pp
1566B 003 24X Fiche 50-000, B2/07/ 12, B3IQOB0015
J210070337 Foruarifs IE Insp Rept 50-330/83-14 on 830801-31 k notice of
vi o lit ion
SrAROSTECKI.R Division of Project It Resident Programs 83/09/23
RHODE.Q K Niagara Mohawk Pouier Corp 2pp 15634 073 34X
Fiche 30-220. 82/09/22,0310070337
-8210070342 Notice of violation from insp on B20a01~31
* Region 1> Office of Director 92/09/22 lp 1S634 075 24X
Fiche 50-220,03/09/22,8210070337
-B21007Q3SO IE Insp Rept 50-2.JO/B2-14 an 820001-31 Noneoropl lance noted
failure to follow radiation work permit r equlrementf for
full face respirators
HUDSON. B D , KIBTER.H 8 Division of Project & Resident Programs
83/09/17 Bpp 1563-1 076 24X Fiche 50-220,82/09/22,8210070337
S3 10 060 202 Ack receipt of 820324 Itr informing NRC of step* taken to
improve items identified in Apps A, D t, C at IE Emergency
Preparedness Appraisal Rapt 50-230/01-10
SMITH, H Division of Emergency Preparedness (, Operational Support
82/09/29 RHODE, ff K Niagara Mohauii Power Corp 2pp [5614 010
24X Fiche 50-220,82/09/39,8210060202
S21006020B Ruponti-s to NRC B3O332 Itr transmitting IE Emergency
Preparedness Appraisal Rept 5O-23Q/01-1O Descriptions of
asiessment/ac t ions to be taken for Improving items
identified in Apps A. D & C of rept encl
UEMPflES, T E Niagara Mohauk Power Corp 02/03/24 HAVNES. II C
Region 1. Office at Director 22pf 15614 Q20 24X
Fiche 50-220, 83/09/2?. B21O06Q202
0209190233 IE Info Watica SO-35. 3upnl 1, "Leaking t. Dislodgefl 1-12!)
Implant Seeds " Svc list encl
CODB.L I Civilian of Fuel Facilities. Materials d Safeguards
B2/1O/06 Connol IdiitBd Edlion Co of New Vork 66p(i 1 37 61 3W
24X Fiche 50-000, 32/10/Oi, H30B190333
8210210355 Foruads IE Insp Rept 5O-220/B2-I6 on P30324-27 No
noncomp liance noted
HflRTIH, T T Division of" Engineering i Technical Programs B2/10/06
RHODE, K Niagara Mohauik Power Corp 3p p [ 5766 237 24X
Fiche 50-230, 02/10/0' S2I021025S
B210210264 IE Insp flept 50-22D/B2-I6 on 020624-27 No noncomp 1 ianco
noted Major areas inspected inservlce insp program!,
activities asiocidted o/rec ] rculati nn sys nopJ, i nc lud ] ng
'jflrfer tralning/nuallf i cat ion leuield 1 proceifures
GRA.Y.E H , MCBREAKTY.R A , DUHR.J P Region I, Office of Director
02/09/14 6pp 1S766 239 24X Fiche 50-320, 02/IO/Oi. B21 02IOL>55
8210390103 Fortmrd* IE Safeguards Insp Flept 50-320/02-19 on D20915-16
No nnncompl lance noted
MARTIN, T T Division of Engineering t Technical Programs H3V10/00
SUNSEH,J J Niagara Moh-auk Power Corp 3pp 1S053 257 24X
Fiche 50-320. 82/10/00, 3310290103
--B210290107 IE Safeguards Insp Rept 50-32O/D2-1B on 020915-li No
noncomp 1 lane a noted Major areas inspected organiiation
& operation, hipn ing i receiving, storage t, internal control,
physical invantori/ ft rcorrfs ', repts
COHEN, I , HOLTNER.E . CODY, A T Dlvisinn of Englniering t,
Technical Programs S2/10/07 6pp 1SB53 359 24X
Fiche 50-320,82/10/00,8210390103
310010157 Ack receipt of 830818 Itr informing NRC of st*ps taken to
correct violations noted in IE Insp Rept 90-2SO/BS-1Q
tfARTJIN. T T Division op Engineering t Technical Programs 82/09/2')
RHODE,0 K, Niagara Kc-hauik Pouor Corp lp 15567 334 34X
Fiche 50-220, 93/09/24, 82100101S7
-S3100101&5 Reipondi to NRC 820719 Itr re violations noted In IE Insp
R*pt 30-230/82-10 Corrective actions safety evaluation b
procedures for reactor VBSB] recirculation notilt safe-end
rrplacement reviewed by site aperatloni revieu committee
LEMPOE9, T E Niagara Mohauk Power Corp B2/OB/10 MARTIN, T T
Diviiion of Enginenrlng b Technical Programs 3pp 15567 235,
24X Fiche' 90-220, 82/09/24, B2100IOI 37
'10010275 Forward t "Systematic Assessment of Licensee Performance
(SALPhNine Kile Point Nuclear Station Unit 1," for May 1901
-Apr 1982, utll 820730 Itr re performance improvements k NRC
B3OA30 raquttt Lilt of SALP 830709 meeting attende encl
HAVNS,R,C Reaion 1, Office o t plrector 82/09/28 RHODE, K
Niagara Mohaurk Pouier Corp 4pp 1556B 327 34X
Ffch* 30-320, 82/09/2B, 9310010375
82IODI0300 "Byitematlc Assesimvnt of Licensee Performance, Nine Mile
Paint Nuclear Station Unit 1," far May 1991-Apr 19B2
Region 1, Office of Director 03/06/32 27 pp 135AB 331 24X
Fiche 90-220,02/09/20,8310010375
9210010287 Responds to radiological controls section of 020622
systematic assessment of licensee performance rept
Commitments for performance improvements provided
LEriPOgg.T E Niagara Hoh.uk Power Corp B2/07/SB BTAHOflTECKIiB
Division of Projact < Residnt Programs 4ap 15368 359 24X
Fiehe 50-330, BS/09/2B, 0210010275
1210010294 Inform* of B2070B meeting at site to diacus* NRC 830623
sys-tiematlc asse*iment of licensee p erforinanei Discussion of
effort! re radiological control actlvitix should tie
pre-pared
BTAROSTECKIiR Division of Project ti Resident Programi 83/06/30
LEMPOES, T E NUgara Mohauk Pooler Corp, 3pp I556B 362 24X
Fiche 30-220,03/09/29,8210010275
02OB19023B IE Bulletin B2--03, "Stress Corrosion Cracking in Thich-
Ual 1, Large-Diameter , Stainless Steel, Rec ircu latlon Sys
Piping at BUR Plants " Svc list end
DEYOUNO.R C Director's Office, Office of Inspection and
Enforcement 82/10/14 Consolidated Edison Co of Neu York
lISpp 15810 125 34X Fiche 50-000,03/10/14,8203190238
0210240177 Ack receipt af B2091 5 Itr Informing NRC of stops taken to
correct violations noted in re Insp Rpt 50-220/82-06
HART1N, T T Division of Engineering t> Technical P 1 ograms 83/10/21
RHQDE.Q K Niagara MoSawk Punier Corp lp 13799 043 24X
Fiche 50-220, 82/10/21, Q3IO360177
3310360184 Responds to NRC B2O9I9 Itr re violations noted In IE Insp
Rept 50-S30/B2-06 Corrective actions personnel surveyed,
nasal smears taken, meat ing hold in/personnel Si disciplinary
action taken
LEMPQES.T E Niagara Mohawk Power Corp 83/09/15 MARTIN.T T
Division of Enginearing fc Technical Programs 2pp I5799 043
24X Fiche 30-220, 02/1O/2J , 0210340177
fl Periodic operating reports d related correspondance
8210130347 Foruiirds monthli) operating rept far Sept I9S3
LEMPOES.T E Niagara Mohaufc Pouer Carp Q2/IO/O6 Director's
Office. Office of Inspection and Enforcement lp 15679 134 21X
Fiche 30-220, B2/1O/OA, 3210130347
6210130390 Monthly operating rept for 6*pt 19Q2
ROMAN, T H Niagara Monaiuk Power Corp, 02/10/05
34X Fiche 30-33Q.S3/10/06,B21013Q347
4pp IS679 135
Rvportable occurrence*' LERs fc related correspondence
0B10150133 Foruards LER 91-019/OC3L-0
DARTLETT.J Niagara Monauk Power Corp 01/07/07 ORIER.fl H
Rvglon 1, Philadelphia. Office of the Director (91/03/01) tp
15697 083 24X Fiche 30-320,81/07/07,0210150135
28
DOCKETED ITEMS
-9210150142 LEft B1-019/03L-0 on B10607.uJi 1 1 e p?rFori7.( local leal rat.
tilting- 1-inch F" T '"'**">" valvf 39 ' 11 '""' "
cwdwur i MM. II" '*"> fal " d to "** Cflu " d " V U rn
seating t packing ma H * Valve renacled
NEILO'J Hiajara H^auK P 01 uer Corp 61/07/06 fiioion I-
rtiUd.ip*"*; a-fi <" - ^rector <BI/03/01> IP I 3697 QB4
34K Ficfte 50-230. B1/G7./O7, B2LQ1 50135
B2Q929Q1B9 Fopuardt public version of Revision 4 to generalinj static*
emergency plan corporate command ctr Emergency Flan
Impl-i-menting Procedure EOF-3, "Envipon/Emergency
Coordinator " Receipt form end
PAJOWBKT.J E Commonwealth Editon Ca 82/09/01 DENTON. H JI HPC
- Ho Detail til Affiliation Owen lp 133A4 123 24X
FiChe 30-000, 03/07/16,8209290135
0210040234 Forward* LER OS-G12/04L-0 -,,,
LEWCE5, T E Miajara Mnhaul Pntisr Cor[i 02/09/24
Rtgion I. Office of Director IP 1 5*>21 071 24K
Fich* so-330.
-B2100(,029l LEfl B2-OI3/04L--0 on 830H31.lou.Br limit of detection
s.Rnlivity net met P" several rad lanucl ides in analysis f
fnh samplei Tech Spec. partite*" tno narrow for uitftrii
LieifrJtt uniti conversion Tech Epc reunion underujai|
PAFROU, N Niagara Na^aL I ^ Poi^er Corp S2/09/24 Region 1,
oVtlc. "f DiUur IP IS63I 072 24X F>cl,. 50-220. B2/09/24.
B2100602S4
6210010007 PNO-l-a2-03!C on 5Z0924.MOIU ultrasonic .ndications Found
in (nErgincii toidenier 5 * pipi-nj * *our in- shutdotio cooling
5-4S fifing Evaluation ies-ta!ed Indication! due to piping
n*anetru i not repoT-tatt t B
MlSTEfl:!! . QRUrmER.E Bfgior, I- 0ic* of Director B2/O9/S7 lp
ISSfiS I4E 34* FieJis 50-320,03/07/27.0210010007
8210250121 LEH B3-Q01 ha> >" cancslBil
COLL [US- H Hiag Hofcawld PDUPP Corp 02/10/19 Bojlon 1- 0**i<
of Director lp 15837 032 31X F^e^^ 50-220,02/10/19,0210280121
DDuKEr 50-223 UNIV OF LOWELL RESEARCH HEACTOH
R FeTiodii operating reports & related correspondence
G3103BOIB3 Forward* monthly operatmj for June 1783
HflLLA^E.T Lauill. Unlv at a2/10/2l Director's Office, Office
of Inspection and Enforcement IP 15037 Oil 24X
Fiche 50-223.33/10/31,8310380103
821Q280IB6 Monthly operating r(ft for June 17S2
LoueU. Univ of BE/ IO/3 1 7pp S5Q37 012 24X
Fbche SO-223. 32/10/21, 0210280183
50-23B AEflOTEBT BADIOCflAPHV fr REaEflflCH REACTOR
F Srcuntij. medical, emergency d fire protettlun plant
2ti Foruarifi IE [nsp Rept 50-223/62-02 on G30B30 !. 0902 Ho
noncompliance notBtf
3DCH.,H E Divnion of Radiologies] Safety !< Safeguards Program
83/09/15 NEWrtCECK,R flerc-test Qpefatlon* 4pp 15&H 320 24
Ticfie 30-223. B3/09/ 1&, BSJ 0060126
--S2100iOI3l IE Insp Rep-t 50-S2BJB3-03 on B2033O-0902 Na noncompllanc
notsrf HS^OP areai in(ietted radiation p-rotaetion program,
emtrgencv p]diinin^ program & anvLran monitoring prooram
CILLIS.H . WEtJSLAWEKli F A . BOOK, H E Civilian of Radiological
Safety S- 5af,guards Program 92/09/14 Spp f5bl4 324 24X
Fich* 50-228, ea/0-7/15-B21<X)A<HS6
B20?290225 Pufillc venlon of Revision 4 ta generating itation
tinirgincy plan corparate command ctr emergencij plan
IwpteniflnHnfl Procedure EOF-3, "Envl ron/Emepgencg
Coordlnatop "
PAJOWEMI.J E , LITEHSKI.L A , FLESSNER, S A Comrnqnuoal th Editon
Co B2/OB/31 llpp 15S&4 IS4 24X Fiche 30-000, 62/09/16,
H309B90123
B2 1 00 10009 Fo-rmardi info to suppl 620701 req.uost; for eiemption fron A(
R per B20?l7 telcon Request applies to Sections III 2 a
t- HI 3 b r Installation of fire suppression GVS
HAUSCH, T J Commonwealth Edison Co 82/O9/33 EI8ENHUT, D
Division of Ulcvnilng Opp 15563 1 32 24X Fiche 50-000.02/09/23,
B2IOO10007
931013O37t /idvisjt that Installation of offaits dose calculation tit
prdaTAm fully operational tracking model & operational
A-niotftl ul|I b deldvad until S2I23I to complete prime
computac installation
SWARTI, E D Commonuealth Eifison Co BS/ 10/06 DENTQN. H R U^TK*
of Nuclear Reactor Regulation, Director 2pp 15602 OS'S 34X
Fiche SO-000, 82/10/06.0210130376
S2102'!0047 Releases public version of revisions to Quad Cities, ?ion
I/ DrBiden emergency plan anneies t. revised generating
station envrgeiiEU pl-an tolephone directorij
FELTDN, J H Division of Rules and Records 82/10/00 Doc uininl
HanagsiriBnt Branch lp 15977 313 34X Fiche 50-000, Q3/1O/OQ,
S3 10390047
B21Q29QO&0 Forward! public version of Revision 3 to Quad Citltt b ?l
em*rjentij plan anne ie, (levisi on 3 to Dresden emergency plan
annei, Rfvisio-n to &u,ron emei-gency plan annei b revised
generating station imapgencg plan telephone directory
MOORE.R CojnrnonuieaLtn Edlion Co 02/07/30 DENTOfJ, H ft UK -
Ho DetalUd Affilfatlan Given 9pp 150 77 314 24X
Fiche 50-000, BS/tQ/QB, 0010290047
--B2I02?QQ77 Public version of Revision 3 to Ouad Cities !. Zlon
ern'rgencif plan anneiei. Revision 2 to Dresden emergency plan
annei Si Rtvdion to Byron emergency, plan annei
Cc-mmonwialth Ediaon Co 83/06/30 lO2pp 15877 31? S4H
FIC^IB 30-POO, H3-/10/08, 3230290047
B21029O080 Puftlii varslfln of reviled generating station etnersnc^ pl
tale-Phone direr tony
8ALLE, D P Commnnwea 1 th Edison Co 82/08/12 43pp 1987(1 alfl
24X Fich SO-000, 82/10/OS. 831 0290047
82102203S3 Providis info T> opganiiation t* perfgrraancu of deptt
responsible fop radiation protection activi t iea, per B20703
conrni tment, Tp*inlnj coordinator aisigned in Apr 19QS to
Improve health phyilcs training programs
TRAMM.T R C ommoaiu*4) th Edison Co 02/10/14 DENTON, H, R OlHte
of NucJiar Bttop Regulation, Director 9pp 19776 307 B4K
Ficha BO-000. aa/IO/U. B21022O3SB
0310230170 Advlsgi that plans b preparedness for offsite protection
neap facility adequate & uifl! be tpplied in event of
TJd iolu-g I cl imtratncij 1L State (< local plani approved subj
to verification of adequacy of alerting & notification tijt
THOMrtB.L M Fidaral Emepgrncy Management Agency B2/IO/14
DIRCKB.M J Office of the Executive Director for Operations If
1S7B3 HB5 Z4X FlcliB SO-010, 02/10/14, B210230170
Ad juflicatary carp*s pond* nee
0210010257 Decision M.AD-695 affirming LBP-01-37 t> L3P-B2-65,
ianctiorino mod to OL far Unit 3 to permit installation at
five hlgA rftniitv spent fuel storage racks t authoriilng
iiii/*nc o-f amends to OL) , respective] ij
TOUPHIHS.? A Atomic Safety and Licensing Appeal Panel
Spp 13574 03 24 X FlcJiv 30-237, 02/09/39. BS10010237
P Opir'feing license stage dectimenti ti corpelpondrnce
8210080001 Adviies that board natiflcatlon issued on 620903 rt an
aualliari; overhead crane rattier than main overhead crane to
move spent fuel pool racks ihauld have been issued u/Mumbr
BN-ea-93
MIRrtOLIA.F. An is taut Director for Safety A.nssirmnt 02/09/14
Atomic Safttv antf Licenilnt Board Panel 4pp 15660 341 24K
Fiche 90-237. B2/09/14, 8S10080001
DOCKETED ITEMS
--02100B0002 Board Notification 8S-92 informs of util failure to carry
out fuel pool rack removal & Installation in manner
described in testimony at hearings Aimliarv overhead crane
used instead of redundant main overhead crane
IPPOLITO, T A Assistant Director for Safety Assessment 03/09/03
Atomic Safety and Licensing Board Panel 3pp 15468 343 24 X
Fiche 50-237. B2/09/I4, B210080001
B21O250203 foruai-di preliminary draft of integrated plant sa*eta
assessment re pti Chapter" 4i "Integrated Assessment Summary "
Enc] draft Includes commitments lubmitterf In response to NRC
830715 Itr 1 assessme-nt moe-ting*
CRUTCHF1EUD. D Oprating fteac Irora Branch 5 83/10/15 DELOEQRGE, L
Camrooniuojlth Edison Co 60pp 1S7B9 204 24 X
Fiche 50-237. 83/10/15. 0210250303
--B2Q9210383 Recommends board notification re util use of auiiliary cram
instead af main redundant crane to install fuel racks, as
described in testimony berore A5LD Licensee has committed to
rol low testimony in completing remaining work
IPP0LITQ, T a Assistant Director for Safety Assessment 82/09/03
EISEtJHUT.D C Division of Licensing 2pp 1 566B 349 241
Fiche 50-237,02/09/14.0210080001
8210250155 Foruardi corrections to proposed Te-ch Spei Pages t S fS 3-1 :
3,3/4 3-5r supporting rrvieu of future reloads b revised
Fig urn 3 5 IrSheet 1. providing extended MAPLHOR vs eiposur"
curve* for barrier lead test assembly fuel
RAU5CH, r J Commonwealth Edison Co 82/10/10 DENTDN, H R Office
of Mud ear Reactor Regulation, Director 2pp 157BB 233 24X
Fiche 50-000, 02/10/13,8210350135
B210G50309 Forwards final safety evaluation of SEP Topit VI-4,
'Containment Molation Sijs " Evaluation ui 1 1 toe basic input
to in Be gated safety assessment Differences from current
criteria 1 is ted
CONNOR. P Operating Reactors Branch 5 02/09/24 DELCGORGE,!.
Commonuealth Edison Co 2Bpp 15609 184 24X Fiche 30-237,
82/09/24,3210050309
B210120105 Requests delay of implementation due dates re NUREO-0737,
Items II D 2. "Plant Shielding." II B 3. "Post-Act Idunt
Sampling 1 (. I I F 1 1. "Noble Oas Effluent Monitor "
SWARTZ.E D Commonwealth Edison Co 02/10/01 EISENHUT,D
Division of Licensing 5pp 15*51 237 24X Fiche 50-000,02/10/04,
B3IOI201Q5
SS ! 1 9O4&4 Informs thJt mods to BRP Section 8 3 2 re SEP Topic VIII-3
on dc power sus bus voltage monitoring & annunciation
initiated Mods uill provide battery voltage indication In
control room & mill replace process computer
ftAUSCH, T J Commonwealth Edison Co 03/10/05 O'CONNOR. P
Operating Reactors Branch S Ip 15740299 24X
Fiche 50-237,62/10/05,8210190164
6210260526 Forwards Revision 3 of Chapter 9 of "Qffslte Dose
Calculation Manual "
CDLOEM, J C Commonwealth Edison Co 03/10/06 CASE, E Office of
Muclenr Reactor Regulation, Director 2pp I5QOS 137 24X
Fiche &0-000. 02/10/06. O21O260526
B21O250177 Errata t Addenda Sheet a. replacing Page q-IO to lh LDCfl
AnlV>ii Dept for Dresden Uneti 3 t, 3 t/ Qusd Cltiss 1 & 2
Nucliar Pougr Stations "
general Electric Co NEDD-24I16A EI1R OB 82/09/30 Sop
13788 239 24JC Flche 50-OOO, 02/10/18, 93102501 55
B21Q2S0069 Provid ddl info re reactor uatET- cleanup room are-a tmp
monltori Temp elements causer no automatic plant response
beyond control room alarms
RAUSCH, T J Commonwealth Edison Co 02/10/17 E1SEWHWT.D Q
Division of Licensing 2pp I 57B7 Ofil S4X Fiche 30-000,82/10/19,
8210230069
e310260495 Provides addl info re actuation of relief valve PRV
2-i201-8O on reactor (uater cleanup sys Eiuting
configuration adequate to handle transient ui/o nither
reactor scram or reactor water cleanup overprasourilation
RAUSCH, T J Commonweal th Edison Co 82/10/19 O'CONNOR, P
Operating. Reactoi-i Branch 5 3pp 15807 257 24X
Flcha 50-237, 82/10/19, 8S103A04B5
021026O296 Formard* safety evaluation of DWR ouners group gener!*
renpante to NUREO-0737, Item II K 3 25, "Effect of Lois of
AC Power on Pump Seals " Ma (nods to seal cooling for
ree ircula tion pumps required Item resolved
CHUTCHFIELD.D Operating Reacton Branch 5 82/10/21 DELOEOJ?OE,L
Commonuiealth E<flson Co 7pp I SaOD 018 24X Fiche 90-237.
82/10/21, 6210260296
B210260S42 Revulon 3 of Chapter 9 of "Offsite Dose Calculatlo
Manual "
Commonmealth Edison Co 82/09/30 93pp 15805 135 SIX
Fiche 50-000, B2/10/06, 821026052i
3S10130326 Comment! on proposed scope of Phase III of SEP as reflected
in individual topic definitions appended to 020909 I tr
Staff encouraged to develop t Implement means to incorporate
po.itivc attributes of Phase III in licensee/NBC Interface
KACICH.R M SEP Owners Group B2/10/07 EIBENHUT* D Divlaton of
Litensing 7pp 15682 179 24X Fiche 50-000, 83/10/07, B2I0130326
3210180059 Provides addl guidance 6 clarification re 030806 request
for addl info per NUfEO-0737, I tern II Q 3, "Post-rtcc ident
Sampling Si;s " Detailed reliability analysli not required
to satisfy NRC concsrns
CRUTCHFIELD, D Operating Reactors Branch 5 82/10/OB DELOEOROE, L
Commonweal th Edison Co 3pp 15720 004 24X Fiche 50-000.
B3/1 0/03,8210100039
*210I90563 Responifa to SEP Topic IH-4 Di "Turbine Missiles " Visual t
fiber optic eiams revealed uiater cutting In line u/keyuiay*
on hub uheels
RAUSCH, T J CommonuiBalth Edison Co 02/1O/OB O'CONNOR,?
Operating Reactors Branch 3 2pp 19736 135 21X
Fiche 50-237. Sa/IO/OS, 8210190S65
'2IO190680 Forwards safety evaluation of licensee 820414 b 0611
responses to NUREO-0737, I tern II E 4 2. "Purge/Vent Valve
Isolation Dependability " Responses acceptable Topic
review tomp le ted
CRUTCHFIELD,D Operating Reactors Branch 5 82/10/13 DELOEOROE. L
Commonweal th Edison Co Spp 15738 192 24X Fiche 50-237,
82/10/13- B310190680
2101904-15 Forwards supplemental response to Generic Ltr B2-05 re
implementation status of NUREQ-0737, I terns II D 3, 1 1 F I 2,
II F 1 3, II F 1 5 i II P I 6, in response to BB1006 requet
SWARTZ.E D Commonwealth Edison Co 92/10/14 EIseNHUT.D
Division of Licensing Spp [5741 202 24X Fiche 50-000, S2/10/14,
B210I90445
210220335 Forward* info re NUREO-0737, I tern It D 1, "Perf ormnc e
Testing of BUR Safety/Relief Valves," per 820727 request
Info adequately demonstrates applicability of result* of EWR
owners group generic test rept NEDE-249S9-P to facility
SIMRTZ.E D Commonwealth Edison Co 82/10/19 EISENHUT, D
Oiv.sion of Licensing 17pp 13776 Oil 24X FUhe 50-237,02/10/19,
B210220335
Inspection reports, IE Bulletins !< c orresponrience
0310060329 Forwards IE Imp Repti 50-010/68-02, 50-S37/B2-03 &
50-249/S2-O3 on B20119-O218 Mo noncflmp J ianc e noted
LITTLE, H 3 Division of Engineering t< Technical Program*
REED.C Commonwealth Edisan Co Sp-P 15419 331 24 X
Fiche 30-010, 82/07/a3.9S100A0329
821O060335 IE InBp Repts 30-010/82-02. 50-237/82-03 S. 50-1349/02-03 on
8Z0117-0318 No noncomp 1 lane e noted Major a mas InafectBil
open 1 unresolved Items & Items af noncompl iance re
integrated leak rat a test
RETIHAUN-F H Raglan 3r Office of Director JACK 1 H, I N Division
of Engineering & Technical Programs 02/07/31 7pn 13*15 333
24X Fiche 30-010IB3/O7/22.B210O60329
6210130533 Forward* IE Inap Reptt SO-O10/82-1 3, 30-337/82-17
50-247/02-1B on B20708-OB09 & notice of violation
BTRGETER, J F Division of Project ti fleudent ^rograiniB
REEO.C Commonui*lth Ediion Co 2pp 13713 O97 r" 1 "
FIcfi" 30-010- 82/0?/28,eaiOI50S23
B210I3093B IE Insp R.pts SO-0(0/G2-1 3, 50-237/02-17 S<
8SO70B-OS09 Noncomp 1 lance noted failure to iiiue &
ir pressure teit procedure
TONOUE.T M , JORDAN.M J r WALKER, R D Division of
Resident Program 53/09/28 Bpp 157(3 1O2 S'
Flch. SO-010, 82/09/38, B210130523
9210060359 Act ncBipt af 320910 1 tr Informing NRC of i
correct violation! not*rf In IE Imp fiopti SO-237/B1-C
50-249/81-32, 90-SB4/Bl-2-3i 30-263/81-23. 50-295/BI-31 (
30-30^1/81-29
SPES9ARD<R L Division of Project ( Resident Progr*n
REED.C Commonuefllth Edlcon Co Ip 15618 334 24
Fiche. 50-OOOr 82/10/01,6210060339,
0aioO60347 R*ipondt to NRC S207IB 1 tr re vloUtloni n
Rep t 50-237/BI-39, 50-249/BI -32, SO- 2-54/8 1. -33, SO-B63
30-293/01-31 i< 30-304/BI-i??- Correttive action* trl
mgt priorities re plant availability mill be contfuc
REED, C Commonwealth Edison Co B3/07/10 KEPPLE
3, Office of Director 13pp. 15618,385 24X
Fiihe.SO-OOO, 02/10/01,0210060339,
30
DOCKETED ITEMS
a2100BOI7a Forwards listing of piping su which fail to meet FSAR
requirements, per (IRC BOOB IS con-f I rmatariy at t ion I tr IE
Bulletin 79-14 operabllltu evaluation updntts taill not be
provided far Dresden & On ad Cities Final update by Die I9B2
RAUBCH.T J ConnonaiBjlth Edison Co B2/10/QI HEPPLER.JG Region
3, Office of Director 6pp 15-640 159 24X Fiche 50-000.62/10/01.
B21008017B
B2101S0539 Forwards IE Ino Rpti 50-QE 0/B2-1 5. 5Q-237/B3-I9 t
50-249/93-20 an 82QB3O-0903 No noncoirijilianc e noted
PAPFRfELLOi C J Division of Encrgfncij Preparedness 1 Operational
Support B2/10/O1 REI>, C Cojnmonutalth Edison CD 3pp
[5714 17S 24X Flcn 30-010,02/10/01,8210150539
--B31015O543 IE Imp Kept* 50-OIO/B2-1 3, 50-237/82-19 i 50-249/03-20 on
820930 -O9O 3 i 09 No noncompl lance noted hajor ara-ai
intpect-ed c. onf irma torij meanjr tntintf program. OC program tor
analytical mesuremnt ti environ monitoring program
SCHUMACHER. (1 C . NICHOLBON.N A . JANUEHA, ft O D(vl*lon of
Emeroencij Preparednsss !. DacT-ttional Support 62/09/30 7pn
15714 177 S4X Fltlit 50-030. S2/1O/OI,B31 0130339
H2100o0266 Confirm* 021103 enfor<*nont confeTinte at Region 3 oft re OA
jiptcts associated u/prac urenent, Inttal lati on S, use of
non-qual 1 f i ed valve guida-i ir B I (ctranujnet ic relief valves
at facilities
SPESSARD.R L Division of Projict ( Resident Program* 63/10/04
REED, C Commonwealth Ed 1 sen Co I? 1564Q. !B1 24K
Fiche 30-000, 62/lO/04,a31OOaoi"!0
831008019O Con Firm B21103 enforctfnint confr<nce at lit 5, ion 3 ofc re QA,
aspects, aiinc [ateri u/proc urement. In-stal latf on ti use of
non-qualified valv* guidrs tr I tctn>magnt i c relief calves
at facilltiaa
SPESSARD. R L Division of Projict t Rendent Programs B2/ I 0/04
REEO,c Caminoniutalth Edison Co I p 15MO IB1 24X
Fiche 50-OOO. 83/10/04, OaiOQBO HO
8208190233 IE Info Hotlce 30-39. Sup pi 1. "Leaking & Dislodged 1-125
Implant Sitdi " SVE list ancl
CDBB,L I Divulon of Fuel Faciliti**, Mittrials i Safeguard i
ea/10/OA Conolidted Editon. Co of Niu Vark itpp. 15761 25O
24X Fiehe 50-000. B3/ IO/OA. 820B190833
BSO&19023B IE Bulletin 92-O3, "Btreii Corroiion Cracking in Thlck-
Wall, Larg-Dlam*t>T>Btainleii St*el , Ret irtu lation EIJI
Piping at QWFt Plant! " Svc lilt etit i
DEVOUNO'R C Dirtctor'n Oiftti, Office of Inspection and
EnforcBmtnt eS/IO/14 Coniol itfattd Ediion Co of Ueiu Vor I
119pp 1981O 1E3 24K Flchi 90*000.62/10/14,13309190233
R Periodic operating report* 4 related ccrreip-onienc e
8210130097 Foruardt manthlij operating repts for Sept 1<?S2
SCQTT, D J CommonnrBalth Ediion Co B3/10/01 Director's Office,
Office gf [npction and Enforctment 1p 15719 001 24X
FichR 5Q-OSO. B3/10/01,B210180097
8210<H01BB FofniariJi LER B2-040/03L-0
SCOTT, J Commonwealth Eduoti Co S2/09/ 1 5 KEPPLER. J Jtijipn
3. Office of Director Ip 1 55B3 164 24X Fiche 50-237, 62/ Off 13,
S2IOO4016B
S3I0040189 LER B2-040yt>3L-O on B20B30, valve Z-I601-33A eihUI ted
oindlng during movement uhile performinfl torua-drgue 1 1
vacuum braler operjbititij test (DOS 1600-7) Cause not
determined Repairs to be made during neit outage
NEE, D T C Dromon wed 1 1 h Ed lion Co B3/09/15 Region 1, Oftici cl
Director 2p p 155&3 IfiS 24X Fiche 50-237, B3/09/I 5, Q2IOO40 169
8210050237 Faruardi LER &2-03B/03L-0
5CDTT, D J Commoniueal th Ediion Co Q2/09/S2 KEPPLER, J a Pp^icn
3. Office of Director Ip 1S411 O26 2fl X Fiche 50-237,02/09/32,
3210QS0227
B2100S0233 -LER B3-Q3BJQ3L-Q on 83082, during MS IV timing turvdUanu
valves 2-203-IC t- 2-203-1D had closed times of 2 2S-s t,
2 67-. rupee 1 1 velij Caused bij timing mechanism drift Valve*
adjusted
RhfEE, B ommonuiHalth Edison Co 62/09/22 Region 3, Gffui cl
Director 2pp IS611 O37 24X Fiche 30-237, S2/O9/22, 6310050M7
led due to brolen
spray ing tuattr
nf ormer
B210040190 PWO-1II-B2-101 on B20BS4, p lant tri
ust*r line to generator hydrogen cooling ag
onto current tr*n*farnnr Line repaired & tr
replaced
TDNSUE. T , WALKER. R . STREETER. J Region 3, Office of Director
83/09/27 l(i 15393 167 24K Fiche 50-237.82/09/37,0310010170
3310250266 Fnruards LER e2-04a/03L-0
SCdTT.D J Comflioniuealth Ediion Co Q2/10/12 KEPPLER, J fltflni
3. Office of Director Ip 15791 145 34X Fiche 50-237,03/10/13,
S2 10350269
--621035037B LER 83-042/03L-O on 820930, contro I rod drive H-IO o^trtu.
*lirn annunciated & rai pontion indication lost Caused bi/
uncnupld inn*r filter Drive recoupled at greater than 30V
power Drive will be overhauled during neit refueling outage
HOLLAND, F Commonwealth Ediion Co 93/10/12 Region 3. UUitt
gf Director 2pp 15791 146 34X Fiche 50-237,62/10/13.
8210350268
0210250233 Fnr<j*rd LER 62-013/011-0
SCOTT, D J Comnonueal th Edlton Co S2/1O/M KEPPLEH.JO (trjion
3, Office of Director lo 15791 102 2-1X Firhe 50-237, D3/ 10'H,
B3102S02S3
--B2I0230296 LER B2-042/01T-0 on 021002, s igh tg lasa isolation t vert
vilvti reported open u/no indication of BICBSC makeup
Calculatloni Indicate leakage uai in eicen of Tech Spec
Caused by operator error Valves closed
HDL L AND. P Commonuiea 1th Edison Co 62/10/H Region 3, OtMci
o* Director 3pp IS7?1 103 34X Ficha 50-237, B2/10/lfl.
62102S02B3
--Q210I8O100 Monthlv operatins rtpti for Sept 1983
SCHRQEBERiB A Commonwealth Erf 1 son CD 02/10/01
15716 O02- S4JI Fiche 50-010,03/10/01.9210180097
DOCKET 90-344 ROBERT EMMET BINNA NUCLEAR PLANT- UNIT 1
F Security, tnidlcal, emergancy ft fire protection plans
S Importable occurri-nces. LEBs d related coTrespondenc*
8210150044 Forward! LER S1-O59/03L-0
SCDTT, D J ConnonuiBalth diton Co 81/10/09
3. Chieaoo, Office of the Dlrettor {31/03/011
Ftche.30-237. 61/10/08,8210190044
KEPPLER, J Region
Ip 13701 136 24X
B2101 50049 LER 81-059/03L-O an 8IO?IO, uhili comJuctlnj) imp on pump
2A.CCSW outboard bearing found burned out Caumed 61; lack of
lubrication In iraled bearing During replacgd*
Z3RHAS, H R Connanuealth Edison Co Bl^lO/oa Rigion 3i
ChU*gp, QfMci of 6h J)ir*ctir (BI/03/OI) Sao 15701 127 H4X
FlcA* 30-337,81/10/03,8210130044,
610k50&21 Relnaiei public version of revision to emergency plan
implementing procedures
FELTON.J H Division of Rules and Records 62/09/30 Docuntnl
Management Branch Ip 15717 064 24X Fiche 50-344, B2/OW30,
8210130431
--&21015Q&43 Foruardt public version of revision to emergency plan
Implementing procedures, including Procedure 5C-41 1 r* NY
State usrnlna point tBl t ti Procedure SC-'llO re insp of
emaTgincu equipment
MAIEft.J Rochester 0i ti Elettrlc Cnrp 62/09/23
CRUKHFIELD, Q Qp-erating Reactors Branch 5 Ip 15717 04 5
FUhe SO-244,B2/Q9/30.BE10130fi21
6EIOOBOOIS Add I nsponse to FOIA ren.gst for 19 categories of info re
nuclear reactor vents t safety problems Forwards documents
listed in App A Docunents In App B conplettlu ulthhild (rif
FO I A Eiemption 9)
FELTON. J,M Division of Rulei inif Record*. 8J/07/I2 UDELLrfi A
Critical H*t Eneroy Project 9pp Bi65 027 24X
Flchl 30-000, ea/07/ia,BSIOOBOOi3
-S210C-BO197 NRC operation* ctr uiige ehrt re events t fitUUU*
HI NRC - No Ditilted AffiHetlon Olven 82/07/13, Ip
24X Fiche SO-000, Ba/07/la.flaiOMOOl9
B21OI5O64B Public version of revision to emergency pl>n implement**)
prociduresi including Procedure BC-411 re NV State yarning
point phone test ii Procedure SC-410 re insp of emergency
equij ment
BODIKEiJ C , SPECTER.B M Rochetter Oas & Electric Corp
92/09/20 4Spp, 15717 066 24X Fiche 50-344,62/09/30,82101504?!
B21O19QSBO Ack receipt of B20224 Itr informing NRC of steps taken U
ic-rreet violations notBrf in IE Imp Rept 30-244/B1-22
ALLAN, H Region li Office of Director 82/1 0/O7 HAIER.J E
Rocn*ttr Oat f Electric Corp Ip 1S739 307 24X
Fiche 30-244,32/10/07,6210190380
DOCKETED ITEMS
31
-- 0210190591 Responds to NHC BI1215 Itr re violations noted in IE Insp
Rept 50-244/01-23 Corrective actions emergency plan training
program Mill be realigned by 620115 to be consistent u/
functional area requirements
M41ER,J Rochester Gat t, Electric Corp B2/02/24 HAYNES. ft C
Region 1. Office of Director 4pp 15739 3QB 34X
Ficne 50-244. B2/1O/O7. 6210I905BO
--8003310I79 Forwards NIC evaluation of use of four miiett oiide fuel
ailemblivi lor Cijc IB 10 Ufc of a*emliliei is acceptable u/nu
changes For future cycles NRC mill require, increase in
nuclear uncertainty re total pe-aking Factor
CHECH, P B Reactor Safety Branch 00/03/11 2IEMHNN.D L
Operating Reactor* Branch 2 (Pr 80042BI Qpp 15727 O3<b 24X
Fiche 5O-000, S2/Ot/2B, 0210G10QO8
--3210190618 Responds to NBC 911215 Itr re violations noted in IE Insp
Rept 50-244/81-22 Corrective actions clarified required
aition, eliminated existing ambiguities, inconsistenciei b
MAIFR.J E Rochester Gas t, Electric Corp 02/04/19 HAVNE6. fl C
Region I. Office of Director 2pp 15739 312 34X
Fiche 50-244,02/10/07,6310190580
8210120103 riddl response to FOIA requeit for nina categories of recordi
generated by present NRC Comnis i loners, prlmarl Ig Cnairman
Palladino tt Commlsi inner Roberts & White House Forward*
App B document*
FELTON, J M Division of Rules and Records 62/07/12 UDELL, rt A
Critical Mass Energij "roject 3pp 19690 117 24X
Fiche 5Q-OOO, 03/07/12,8310130103
--Q3fOI9063/ Responds to NRC B20530 Itr re violations noted in IE Insp
Repl 50-244/81-23 Corrective actions committee established
to evaluate & inventory supplies Rept will oe submitted
by 621231
MAIER.J E Rochester Gas (, Electric Corp 82/06/30 SMITH, hi
Division af Emergency Preparedness * Operational Support 22pp
19739 314 24V Fithe 90-244, 92/10/07. B21 O1905BO
B21QIEQL31 Agree* u/polnt raised 1 in 820201 in a mo re NIC incident
response program Point* raised bij staff mill be addressed
in rept on le*son learned 1 at incident response ctr from
fan i 1 I ty event
PALLADINO, N J Commissioners B2/02/16 RDDEHTS, T M
Camiiisiioneri Ij 1 9i9O 13B 34* Fiche 9Q-OOO, B2/07/1 3,
82101^0103
--B2IO1'?0447 Responds to NRC 611215 Itr re violations noted in IE Infip
Rept 50-24-t /Bl-22 Corrective actions revision of Emergency
Plan SC-1 completed prior to startup after 19B2 refueling
shutdown
HAIER.J E Rochester Oaa 1 Electric Corp B2/10/07 HAVNES. R C,
Region 1, Office of Director lp 15739 336 24X
Fiche 50-241. Q2/10/07, B2101905BO
8310070007 Respond* to FOIA request for eight categories of records ro
steam generator" & steam turbines App A documents provided
in R Udell FOIA Request 81-313 Foruards documents listed in
App B
FELTON, J M Division * RuUs and Records B2/0&/10 LONQ, D J
Minthrop, Sttmson, Putnam t- Roberts 9pp 15645 063 34X
Fiche 30-OOO. 62/C-a/10,a2I0070'007
6210210212 Ack receipt n F 821015 ! tr informing NIC of steps taken to
coirect violations noted in IE Insp Rept 50-244/63-15
STARQSTECHI.R Division of Project ! Resident Programs B2/ 10/25
MrtlER.J E Rochester Gas 1 Electric Corp lp 15B53 279 24X
Ficfte 50-214. aa'10/35, 0210290212
-0203170310 Foryardt background summary of operating eiperience iu/
stean genoratoTi prior to 080125 tube rupture
JOHNSTON, W V Aiaistant Oirectcr for Materials & Qualifications
Engineering B2/QI /2B LAINAS.fi C Assistant director for Safo
Asueumtnt Spp 15645 10-) 24X Fi che, 50-000. 62/03/10-
0210070007
--8210^90317 Responds to NRC 630914 Itr re violations noted In IE Insp
RepL 50-244/92-15 Corrective actions situation reviewed
4 determined to be Isolated case Further action unnecessary
MAIII,J C Rochester Gas t Electric Corp S2/10/19 ERUNNEH.E J
Region 1, Office of Director 2pp 15853200 34X
Tiche 50-2441,82/10/25.0210290213
Adjudicator^ correspondence
62102110060 Updates B20730 status rept on MRC issuances Final integrated
plant safety assessment rept to be issued on 021039
Conversion safety evaluation rept d update to FES to 6e
issued in Nov
VQUNG.M A Hearing Dranch 4 B2/IO/26 OfiOSBMAN, H , LUEBKE.E A .
fiDLE.R F Atomic Safety and Licensing Board Panel lp 15937 263
24X Fiche 50-244. 02/IO/2i, 6210290060
O Advisory Committee on Reactor Safeguards reports (. correspondence
8200290010 Summariios 260th ACRS meeting on B2Q81S-14 in Washington, DC
re full pouier OLs For Orand Oulf I '- Watts Bar I & II,
systematic evaluation ', integrated reliability assessment
or Gmna ! control roam habl tab i 1 1 ty
SlfEWHON.P ACRS - Advisory Committee on Reactor Safeguards
82/03/06 PALLADINQ.NJ Commissioners 3pp 15649233 34X
FlchO 50-000. 82/OB/26. 6300390010
B2101B0074 Foriuards B209I7 response to ACR8 comments t, recommendations
per facility SEP revieiu
CRUTCHF1ELD, D Operating Reactors Branch 5 03/10/07 MA1EH.JG
Rochester Gas fc Electric Corp 2pp 15719 347 34X
Fiche 50-244, Q2/10/07. B2I0100071
83101600B3 Responrfi to ACRS 02081 B comments & recommendations re
facility SEP review Draft NUREQ-0821 uil 1 1 be revised to
reflect agreements
DENTON.H R Office of Nuclear Reactor Regulation. Director
62/09/17 SHEWMON.P S ACRS - Advisory Committee on Reactor
Safeguards 2pp 15719 349 24X Fiche 50-244, S3/10/07i
0310190074
P Operating license stage documents b correspondence
9210010008 Responds to FDIA request far 19 categories of document* re
nuclear reactor events & safety problems Foruards documents
listed in App A
FELTON. J rl Division of Rules and Records B2/O6/38 UDELL -R A
Critical Mas Energy Project 15pp 15727 005 24X
Tiche 50-000i B2/06/2B. 821001000B
-0202240397 Submits daily highlight re 820203 Insp of steam generator II
to determine location of BSD 129 ruptured tube event Eddy
current tests performed on tube near periphery on hot leg
ild & four adjacent tubes
LYONS, J E Operating Reactors Branch 5 B2/02/O3 DfNTQN.H
CARTER, J , EIBENHUTrD NRC - NP Detailed Affiliation Oiven lp
15645 039 34K Fiche 30-000,63/08/10,8210070007
-S203020267 Submiti dallv highlights For B2021O meeting w/util ro
requiremBTit s far restart Pi-tor to restart, util should finnh
fiber optic imp of secondary side of B steam generator h
obtain dssignir opinion on effects of plugging
LYONS, J E OparatinJ Reactor* Branch S 82/02/11 DENTON.H F? ,
CARTER, J , EIBENHUT, D NRC - No Detailed Affiliation Olvan lp
1S645 092 34X Fich*- 50-OOO, 83/OB/IO, B210O70007
-B2030405O2 Submiti dailij highlight re television insp of D steam
generator revealing mis singi partial ly mliilnig !< damaged
tubes d presence of foreign object's Meeting tu/NRC planned
LYONS, J E, Operating React&rs Branch 3 B2/02/19 DBNTON. H i
CASTER, J . EI8ENHUT, D NRC - No Detailed Affiliation Olven, lp
15645 O9i 2flX Fich* BO-OOC-, 82/OB/ I 0, 8310070007
-BB03100S93 Submltii dally highlights re imp of ruptured tube usino
fiber optics rive-Inch kite shaped rupture caused liu, tfcre-as
corroiion linked to differential eipan*ion batueen tuba ti
tube urjpper uedge Tube being plugged
UVONS.J.E Operatino Reacton Branth 5 02/03/03 OENTON.H .
CARTER.J , EISENHttT, D NRC - No DBtailed Affiliation Qtvon lp
19645 0<?1 84X Fiche SO-OOOr 83/OB/ 10, SS10O70Q07
-8203110334 Submits highlight* re fiboT optic Inveit i gatl on of leconiljifg
(id< of B team geneTatnr revealing damage to previously
plugged tubei Preltmlnary indicatiors ihou one tube severed
Investigation of peripheral area continuing,
LYONS, J E Operating Reactors Branch 5 02/03/12 DENTON.rl >
CARTER, J , EISENKUT.D NRC - No Detailed Affiliation Olvon lp,
1S64S 094 24X Fichff SO-OOOj B2/OB/1O,B31 007O007
-920311033'? Submit! daily highlight* r Insp or periphery of B atflam
generator hot leg Inip remit* indicate appro i 7-10
previouly plugged tubm in peripheral area leverly darvagad
TV insp planned for A t< B generator*.
LYONS, J E Operating Reactors Branch 5. 32/02/1 A DEfJTDN, H
CARTER.J . EIBENHOT, D NRC - No Detailed Affiliation Oivin Spp
13i4S 093 24X Fich" 90-000183/08/10,0310070007
-B2031I04O3 Forward* rpi>nse to JD Dumele, chairman of Pollution Control
Board, State at ILi questions In S3OI 27 Itr
JOHN8TON,W, V A*ii*t*nt Director for Materials Si Ouali t ica tion*
Engineering BS/Ot/SS. LATWAS, 0, Aniitint Director tor Safety.
Alsessmint, 2pp, 13445 IBi 24X Fiche, SO-OOO, 0H/OB/10,
8210070007.'
32
DOCKETED ITEMS
-8306070250 Forwards Operating Reactors Assessment Branch input for
Oinna restart afetg evaluation rept. Section 5. re (team
generator tnsp program, failur * analysis t. repairs
IPPDLITO, I-A Operating Reactors Assessment Branch 62/05/13
CRUTCHFIELD, D Operating FJeacton Branch 3 43.pp 1 5445 I3B
24X Fiche 50-000. S2/08/ 1O, B31 0070007
B210Q10444 Responds to NBC 8209O2 request for review of NUfl.EO-0737,
Item II B 3i ' J Po* t-Acc ident Sampling " Criterion iiiili be
adequately addressed bu. 830213
rtAIER. J E Rochester Oas Electric Corp 82/09/33 CflUTCur 1FLO,
Operating Ruacto-ri Branch 5 lp 1 5S7O 174 SIX
Flche 50-244. B2/09/23. B21O01O44'!
-82062'?OA55 Forwards Mechanical Engineering Branch input to re
Sections 4 S through 4 0. 5 l.S 3.5 4, 61 & 62, per 820433
request
HNICHT.J P Assistant Director for Components t. Structures
B2/O6/15 LAINftS.Q C Assistant Director fc
I3pp 15i45 153 24X Fiche 50-000, B2/QB/IQ,
En 9 ineen.no
Asses srtient
B2!OD7OOQ7
Safety
-8210070030 Util handout from 820210 meeting u/NRC re 830125 steam
generator tuba rupture at facility
* Rochester Oas & Elatr-lc Corp 82/03/10 I7pp 1SM5 O72
2AX Fiche 50-000, B2/GB/ 10, 621 0070007
-6210070069 Submit! daily highlight re H20210 meeting u/util concern]
requirements to 6 e met prior to restart of facility Ho
suFfi-clent baafi presentad at this time to permit plant to
return to operation
LYONS, J E Operating Reactors Branch S B2/03/ I 1 DENTDN, H ,
CARTER, J , EISENHUT, D NRC - Ho Detailed Affiliation Given lp
15645 -093 24X FichH 50-000. S2/OB/ 10, 82I0070DO7
-8210070073 Submits dailij highlight re util 620319 press conference
presenting updat-e on recovery activities at facility
Muting lu/NRC icneduled tar SSQ303
t.VONS.J E Operating Reactors Branch 5 B2/O2/22 DENTON. H .
CARTER, J , EIBENHUT.D NRC - No Detailed Affiliation Given lp
15645 077 34 X Flche 50-000, 62/OB/ 10, 0210070007
9310010337 Forward* application to amend App A of License DPJ1-10 i.
proposed Tech Specs to permit reorgan I lation of plant staff
HAIER. J E Rochester Gas fc Electric Corp B2/09/S8 DENTON, II fi
Office of Nuclear Reactor Regulation. Director lp 15574 14-1 ?*.<
Flche 3O-244, B3/O9/3B.B2100I0357
Bai001O3&5 Application to amend App A of License DPR-18, c hanj i
Specs to permit reorgan i lat ion of plant staff
MAIER.J E Rochester Oas 8, Electric Corp B2/Q9/28 2|>p
19S74 143 24X Fiche 50-244. B2/07/3B. 931 0010357
g lri.li
-6310010369 Proposed Tech Sp
plant staff
* Rochester a s t Electric Corp B2/09/38
24X Fiche 5O-244, 82/09/28. 8210010357
changes to permit reurgani i jti on of
ilnp 19571 147
9310040281 Forward t application to amend License DPH-19, rpvi i ing
containment Isolation boundary requirements
- ~ Rocheitr Gas & Electric Corp B3/09/2B
HA1EH, J
Office of Nuclear Reactor Regulatu
FUh* 50-244, e3/O?/28, B21004O2a I
Direc tor
lp
DEW TOW, H II
15507 IfiV 24K
8210040384 Application to amend License DPR-10, rei s ing c out* i
Isolation boundary table
MAIER.J E Rochester 0-as d Electric Corp 82/O9/3B 4pp
155B7 17O S4X FlcKe SO-244, S2/07/2B, 821 OO4O3BI
-B2 1 0070076 Submits dailij highlight re B203O1 meeting u/util 1 SE0302
meeting u/W tit ing house in Qethesda.rlD to discuss recovery
ictlvitiei at Facility L generic fteam generator tube
degradation i respective lij
tVONBjJ E Operating R eaetorl Branch S 89/02/26 DENTON. H .
CARTER. J i EI5ENHUT.O MRC - Ha Detailed Affiliation Given lp
IS64S 098 34X Fiche 50-MO, 62/09/10, S210070QQ7
-8210070030 Sutimlti datlij highlight re B3O301 meeting u/util re propnted
rtcavtry program for facility NRC concurred u/ proposal to
remove small number of steam generator tube sections for
metal lurglcal eiam
LYQNSiJ E Operating Reactor* Branch S B3/03/04 DENTON . H .
CARTER, J , EISENHUTiD MRC - Ha Detailed Affiliation Given lp
1S645 077 24X Fiche 50-000,63/09/10,8210070007
-6210070033 Submit! daily .highlight re util completion of cutting 3-inch
hole In ittam generator B an 62030 B Burst tube & tube*
fi44C54,R43C5'l & R43CS6 Temovsd for metal 1 iirglcal Eiam
Meeting tentatively scheduled for 930332
LYONS.J, E Operating Fleaceon Branch 3 B2/03/IO DENTON , H ,
CARTER, J . EISENHLfT.D MRC - Ha Detailed Affiliation Given lp
15M5 100 24X Fiche 50-000, 62/09/10^21 0070007
-82(0070087 Buomita dally highlight re 830323 meeting w/utii t
Wt it Inotious concerning status of proposed repair
activltiei Tuentij-f our tubts removed from stean generator B
Foreign abject found in Unfj* Area 4
CVONBjJ E Operating fieactor* Branch 5 83/04/03 DEHTON. H ,
CARTER, J , EISENHUT.D NRC - No Detailed Affiliation Oivn Hpp
IS645 1O1 24X Fiche 30-000,63/08/10.6310070007
-6210O700W Submits daily highlight r nitart of facility, Plant
eipdcted to be ready for operation! above 5/1 power upon
compl*tian of itartup pnyilci tistlng on 820335
LYONSj J E Operating Rtaitort Branch 3 B3/0&/25 DEN TON , H ,
CARTER, J , EISENHUT.D NRC - No Detailed Affiliation Olvan lp
1S648 1O3 24X Flctte SO-OOO, 63/03/10,821 00700O7
-8310070131 Foruardi prHminjcij eitimate of Uak rate vi tim* during
Ulnn* 20125 *tea<n ganei-ator tube rupture event S. plot
ihowing Imp ortatit parameters ti ita-tut of sys
IPPQLITO.T A OperatliiD Reactors Aiseisnent Branch 83/03/05
ROE. J. NRC - No Detailed Affiliation Oiven 3pp 15i45 12( 34X
Ficne 50-000, 32/09/10,8210070007
-B210070135 Btvil rept tnout r. Olnna 820135 team tenirabar tube
rupture svent HRC lith monthly tatui rep t ID Congrnn ra
TH1-1 reitaTt end
* NRC - Ho Detailed Affiliation ffivtn 82/03/11 3np
136 12B, 24X Flthe 80-000, Ba/OS/10rB21 00700O7
-8210070165 Devil rp I Input re remov* I of telectfd tube samplta throujh
two acceii ferti drilled In tide of itesm generator to
otitiin niBtallur-gical data for evalwation of it* am generator
B tube failure; mecjianiim
* NfiC - No DetaiUd Affiliation Oivin aa/04/OB a pp
1564S 136 S4K Fiehr 30-OOO, 02/08/10,631 0070007
B2100402B8 Proposed change to Tech Spec Page 3 h-h i
iSiOlation boundary table Safety evaluation enc 1
Rochester Ga.i 6 Electric Corp 82/09/28 3pp
Flcne 50-344, 83/09/3B, B3100402BI
c on tai nnent
159B7 171 JM*
B21DOS0214 Notifies that except for occasional transient specici>iD
federally listed or (iropased threatened or endangered
Iptciei eint in project impact area, in response to B3O902
request Federal list of endangered ipeclea end
HAMILTDM.P P I n ter lor, Dept oP, Fish 4r Wildlife Service US/O 4 ?/.^
CnUTCHFIELD. D Operating Reactors Branch 5 3pp 15611 357 it'll
FUhe SO-244, 0a/0?/2B, B2IO05031 4
B210050059 Approves B00220 request for withholding info re uie of Allied
onife -fuel assemblies for Cycle 10 from public disclosure
<ref 10CFH3 790)
CRUTCHFIELD.D Operating Reactori Branch S B2/09/29
WIESErlANN, R A Ueit inghouse Electric Corp 3pp 1503 171 ^4*
Fiche 50-344,82/07/29,8210050059
B210I3032& Comments on proposed scope of Phase III of SEP at reflected
in individual topic definitions appended to 930909 1 tr
Staff encouraged to develop L implement means to incorporate
poiltlve attributes of Phase III in licensee/NRC Interface
MCICH.R M SEP Owners Croup B2/1O/07 EISENHUT.D Division of
Licenslngi 7pp 15A93 179 24X Flche 3O-000, 82/10/07, B210iaOJi?6
B210130074 Foru/ards 920917 response to ACRS comments b recoirnnunildtiHars
per facility SEP review
CRUTCHFIELD, D Qperating Reactor* Branch 5 Q2/1O/07 MftlEO.JE
Roc h niter Oai b Electric Corp Spy I 371 9 347 24X
Fiche 80-244, S2/1Q/07,H2101B0074
6210160033 Reipondt to ACRS B20818 comment! & recommendation! rs
ficllltij SEP rfrVieui Draft NUREG-09E1 ui 1 1 be reviled to-
reflect agree;me<nti
D EN TO Mi H R Office of Nuclear Reactor Regulation, Director
B2/09/17 6HEWMON.P B ACRB - Advisory Committee on Reactor
Safeguard? 2fp 13719 349 24X Fiche 30-244, B3/1O/O7,
3310180074
B2IO190083 Forward i Amend 54 to LUensi DPR-1B. laf ety evaluation t
notice of Issuance & availability Amend approvei provisions
upilatinih containment isolation valve in Table 3 6-1. to
reflect plant lua mod
CRUTCHFfELD.D Operating Reactors Branch 3 82/10/07 MAIEft, J E
Rochtltsr Oat & Electric Corp Sff 15719 294 24X
Fiehe 50-244,82/10/0-7,6210180062
821O1600B7 Amend 34 to License DPR-18. appro ving provision* upJating
containmeTit Isolation valve In Table 3 6-1, to reflect plant
iu.i mod
CRUTCHFIELD, D Operating Reactors Branch S 62/10/07 lp
19717 S76 24X Flcht. 90-244, 8S/10/07, BB1 01B0082
321O1S0090 Stfet(j evaluation supporting Amend 94 to LUenie DPR- IB
* Offic* of Muclear Reactor Regulation! Director 82/10/07 3p
15717' 300 24X Flche SO-244. B2/10/07. B2101800B2
DOCKETED ITEMS
33
--S210180094 Notice of issuance t. availability of Amend 54 to Lie
DPR-1H
CRUrCHMEt-D,D Operating Reac tors Branch 5 B2/IO/07 2p p
15717 303 24X Fiche 50-244, B2/10/07. B2I 01SOOB2
B2JOiaOU2 Forwards 631004 FR not ire. announc i no ACRS Subcommittee nn
Eitrotne Eiternal Phenomena B21Q01 & 33 men ting? in Santa
Manic at CA ta discuss Flooding k seismic hazards
CflUTCHFIELD, D Operating Reactors Branch 5 62/1O/O7 tlAIEFl. J E
Rochester Oas t, Electric Corp 3pp 15719 332 24X
Fiche 50-244. B2/10/07, B210IB01 12
8210190149 Forwards Amend 55 to License DPR-1 Bi safety evaluation J.
notice of issuance d availability Amend incorporates neu
License Condition 2 CUO) to confirm that neit steam
generator insp uill be performed during refueling outage
CRUTCHFIELD. D Operating Reactors Branch 5 S2/1O/OB MAIER, J E
Jioch*str Cas t, Electric Corp 2pp 15719 1O5 24X
Fichu- 50-341. 83/10/08,8310180149
-S2IO1G0153 Amend 55 ti
Condition 2 CUO) tc
Involving c ddy cum
6 performed during
License DPH-10i incorporat ing neu License
confirm that tie it steam generator insp
nt Ic visual insps I. mater lancing mill
refueling outage
CJIUTCHFIELD.D Operati ng Reac tors Branch 5 B2/IO/00 2pp
IS719 107 24X Fiche 50-244. 02/1Q/OB, 6210180149
--821007O172 Foruaids info re stc
operating PIJHs.pcr 750320 1 I
including defect indications
plugged uill not be provided
GOLLER.K H Division of Reai
75/O3/24 tIACCAflV, R fi Dlvi
only) Spp
15645 196
am generator integiitg ', insps at
1 requests Details of insps.
tube plugging ciileria >t tubes
eicept for Point Beach 1
toi Licensing (NHR-I97D on lijl
sion of technical Flcvieu (NRR-15'2
Fiche 50-000. !3/OB/ 10. H210070O07
B208190233 IE Info Notice 8-3b, Sup p 1 1,
Implant Seeds " Svc liat o-ncl
COBB.L 1 Division of Fu&l FarilitiBs. Mutenal
82/10/06 Consolidated Edison Co of Neu Yot 1
24X Fiche 30-000.92/10/06 H30Q1 90231
king ", umlodgud 1-125
afeguards
8210130439
visual in
Hunt in
:ti\
>ddi;
inlet probab I u caused bi|
pi es*ur i lation f i am prim
I1AIGR.JE Rochester lia
Operating Reactors Eran
lube in U-stearo gene
lot up 1 1 c 5 ,
Fiche 50-244. O2/ 1O/06, B2I O I, 10419
educti
ry side through leaking plug
t Electric Corp 02/10/06
H 5 Ipp 1 5602 OH) 24X
cHUrLHFiri.l). U
B21O210201 Foruiardi IE Insp Rppt 5Q~244/B<>-16 on f);i()Q30 0903 No
none oiup liance noted
MARTIN.T T Division of Engineering t- Technical Programs
MAIER, J E nocheatar Gas fr electric Corp ^pp ISM/, 34b
Fiche SO-244, 82/1O/06., Q2I O210201
S2I01B0153 Safety evaluation supporting Amend 35 to License DPR-lfl
< Office of Nuclear Reactor Regulation, Director 02/10/08 3pp
15719 109 24X Fiche 50-244. 83/10/08, 82 1OIB01 49
--3210180161 Notice of i S3 nan
DPR-1S
CRUTCHFIELB.D Operating Reactors Dranch 3 82/10/08
1571"? 113 24X Fiche 50-24-1, B3/IO/QH, B2I OIG0149
t aval 1 ab 1 1 1 tij of Amend 55 to License
2pP
--Q210210213 IE Insp Dept 5(1-244/03-16 nn (W0030 0903 Ni
noted Major areas inspected falloiiiup on previously
changes & mods ^ mod & cTesign program
BLUMQERG.N . uISSEIT.P , CAPHTOH, I Division of Project 1
Resident Programs B2/1O/Q3 9pp 15766 147 34X
Fiche 50-244,02/10/06.8210210301
B21OiaOkBl Clarifies 020903 request for addl info re NUREO-0737, Item
II & 3. "Poat-Accidont Sampling Sys " Clarification section
of U20902 Itr provides staff gu i del ines. not requirements
on muetlno NUfiEC-0737 criteria
CRIUCHFIELD.D Operating Reactors Branch 5 B2/10/Oa MAIEI.J E
RochBBtBr Oas (. Electric Corp 3pp 15719 115 34X
Fiche 30-244, B2/10/OB. S21O1B01Q I
R21022O105 Advims that revieu of util 910901 respansa to NUIIEQ-07T/,
Itum III D 3 4, "Control Room Hab 1 tab i 1 1 tiji " camptetud Issuo
satisfactorily resolved etcept for single failure criterion
of intake tt r!iauat ductuork
CnUTCHPTELD, D Operating Reactors Branch 5 FJ2/1O/1E3 MAIEU. J E
.Rochester Oaa J< Electric Corp 2pp 15775 100 24X
Fichn Sft-241! 82/10/13.8210220105
0207140037 Informs that info submitted by licensee in rosponse to
mjREC-0737. Item III D 3 4, "Control Room Hab i tab i I i fry"
accBp tab le
HUHPHV, D W BattolU Memorial Institute, Pacific Northuiost
FIN B-2333 B2/03/S3 HULMAN, L Accidont
2pp 15773 102 24X Ficho 50-244, 82/1 0/1B,
Laboratory
Evaluation Branch
9210220105
D2 1 025027 5 Forwards status rept re unresolved safety issues, par NRC
B20iI7 reojuest Info includes description of problem based
an NRC (facurnentatlon
KAIER, J E Rochester Oas !< Electric Corp Q2/IO/19 CRUTCHTIELD, D
Operating Reactors Branch 5 47pp 15791 049 24X
Fiche SO-344, B2/10/19, B210250275
Irtipeetian roportui IE Bulletins b correspondence
6210-070007 Raspondi to FQIA request for eight categories of TBCOTOB re
strain generator! b Htoam turbines App A documents provided
in a Uilll FOIA Heo.uest Bl-313 Forwards documents listed in
App B
F ELTON. J M nivision of Rules and Records 82/08/10 LONG, D J
Wlnthrop. Stimson, Putnam t< Roberta 9pp 15i45 063 24X
Flcho 30-000.82/00/10,83(0070007
3210070033 Submit* dally highlight re May 19B1 Insp of ruptured tube in
Qlnni ste<m generator Failed tube located in uadge ataa of
itaam generator
UVONS, J E Operating Reactors Branch S sa/OS/04 DENTON.H ,
CAHTH,J., EIBENHUTiD NRC - No Detailed Affiliation Given lp
[5643 090 24X Fich 50-MQ, BS/OS/10, BSI 0070007
0210070139 Forward! tabulated data on steam generator insp t mainl at
facilities Data should be provided to licensees
IPPOLTTO. T Operating Reactors Assessment Branch B2/04/01
VARCJA, S Operating Reactors Branch 1 Spp 1SA43 131 34X
Fiche SO-OOO, 82/oa/lO, 8210070007
B2101905BO Ack receipt of E120024 Itr inpormi.ig NR1 of s
correct violationo noti'd in 1C Insp Flspt 10-244/01-22
ALLAN. JM Region 1. Office of Director (12/10/07
Rochester Oas !, Electric Coi p lp 15739 107 24X
Fiche 50-244, B2/10/07. B2I 0190500
--B210190S9I Responds to NSC Bl 1215 Itr re violations noted I r> It
Ropt 50-244 /B1-2J Conectivo actions emergency plan training
program ui 1 1 be realigned by 030115 to be consistent ui/
functional area requirements
I1AIER.J E Rochester Oas k Elertric Corp t!2/OJ/2rt IIAYNE'i.
Region 1. Office of Director -Jpp 1573V "301] 24X
Fiche 50-S4 4, B2/ 10/07.0310190500
~fl2l019061B fleiponds to NilC Bl 121-i Itr re violations noted in 3L Imp
Rept 50-244/ai-22 Correc t Ivo aclions clarified required
action, eliminated eiisting ambiguities, incunei stenc ma t>
error* for emargsncy functions
MAIEFI.J E Hoche6*-Dr Gas t. Electric Corp 0a/04/|? Hrt^HES.t! <
Region 1. Office of Dlrectoi 2pp 137,19 )!.' Mil.
Fiche 5Q~244 1 82/10/07,B210I'70'iBO
9310190637 Responus to NRC 820530 llr re violatinns noted in II luip
Kept 50-214/01-22 Corrective actions committal' established
to evaluate & inventory supplies Repl uiill be submitted
by 821231
MAIER, J E Rochester Qas '< Electric Corp 0.2/06/30 &HITM.O M
Division of Emergency Propaiedness L Operational Support ^-!pp
15739 314 24X Fiche SO-24'1. 92/10/0/, B21 OI905BO
0310190647 Responds to NRC B112IS Itr re violations noted in IL Intp
flept 50-244/01-22 Correc t ive actions revision of Emergency
Plan SC-I completed prior to startup after 19B2 refueling
shutdown
MAIER.J E Rochester Gas !, Electric Corp Q2/10/07 HAVNCS, R C
Region 1, Office of Director lp 15739 33i 24X
FichB 50-244,82/10/07, B210I90500
8210180149 Forwards Amend 53 to Lic&nse DPfl-18. safety evaluation b
notice of issuance >j availability Amend incorporates iieu
License Condition 2 CUO) to confirm that unit steam
generator insp mill bo pot-formed during refueling outage
CRUTCHFIELD, 1) Operating Reactors Branch 5 02/10/03 MAIEH, J k
Rochester Gas (, Elaetric Corp 2pp 15719 105 34X
Fiche 30-244, H3/10/OB, 0310180149
--8210180153 Amend 55 to License DPR-1 B, incorporatino neu License
Condition 2 C<10) to confirm that next steam generator insp
Involving eddy currant b visual insps & mater lancing uill
be performed during refueling outage
CRUTCHFIELD, D Operating Reactors Branch 5 B3/10/OB 2pj>
13719 107 24X Fiche 30-H44, 83/10/08, 821 0180149
B21Q1H013B Safety evaluation supporting Amend 55 to License DPR-1B
* Office of Nuclear Reactor Regulation, Director B2/10/08 3pp
13719 109 34X Fiche 30-B44. B2/10/00I 82 101B0149
34
DOCKETED ITEMS
liability of Amend 55 to Licenss
DPR- IB
CRUrCHFIELD.D Ooe
13719 192 24X Fic-
tino Reactors Branch 3 83/10/09
50-24-J, B2/1O/Q6-. B31Q1B0149
2pp
821022034'; Ark receipt o> B20915 i' 1005 Itfs informing NRC of steps
taken to correct violations noted 1 in IE Insp Kept
5.0-2-) 4/32-] 4
STARDSTECK1.J) Division of Project 6 Resident Programs B2/IO/13
MAJER, J E Winchester Qas I, ESectric Corp Ip 15777 355 24X
Fichs 50-214, S2/10/I3. 9210330344
--8210220352 Responds to NBC B20816 Ifcr re violations noted in IE Insp
Rep* 5Q-244/B2-14 Corrective actioni all four 480-volt
safeguard buses tested & draft test procedure issued to
affi.it? engineering dopt far review
MAIER'J E Rochester Gas '. Electric Corp 82/09/15 DRUMMER. E J
Region I, Office of Director 3pp 15777 356 34X
Fiche 50-344, B2/10/-13.8210220344
9210220360 Responds to NRC BSQGli Itr re violations noted In It Insp
Rept 50^244/82-14 Correttive a-ctiotis all Four 480-vo 1 t
cffsite engineering dept for revipu
MATER. J E Rochester Gas I Electric Corp B2/10/05 QRUNNER, E J
Region I, Office of Director 2pp 13777 35D 2-JX
Ficne 50-244, 92/10/13. 0210230344
2QB 1 9O230 TE Oulletin 32-O3, "Stress Corrosion Cracking In Thi
Wal 1. Large-Diameter. Stainless SteeL H ec ircu lation Sys
Piping at DWR Plant! " Svc list enc I
DEYBUNG.R C Director's Office. Office of Inspection and
Enforcement 82/10M4 Coriiol idat ed Edison Co of Neu Vor k
115pp 15B1O 123 34X Ficne 50-000.85/10/14,8200190239
B2101907O3 LER S2-022/01T on BSlOOl.on* tube of A steam generatoT inltt
found u/crevice intergrenular attack indication above
plugging limit steam generator inlet had 28 tubes above
plug-Ding limit 6 3 Hi/stress corrosion Rept follows
SI.'QUt B A Rochester Gas & Electric Corp B2/10/Q4 HAYMES, ft C
Region 1, Office of Director Ip 19736 154 24X
FlchB 50-344, B2/1O/04,S21Q1 1 70703
8210250334 Forwards LEFi B2-022/OIT-0
MAIER.J E Rochester Oas i Electric Corp B2/10/15
Region J, Office of Director Ip 1 579O 001 24X
Flcn& 5O-244, B2/10/13, B21O250334
8210250343 LER 62-022/011-0 on BSIOOl.eddu. current eiam of tlean
generator A Inlet indicated one tube u/erevicc in tergranolar
attack indication above plugging criteria tc 32 tubes an
steam generator B u/ind 1 cations All 33 tubes plugged
BODINE.J C Rochester Gas & Electric Corp 02/10/15 ItcQlDn
Office of Director 2pp 13790 002 24X Flthe 90-344,1)3/10/19.
8310350334
DOCKET &0-24S MILLSTONE NUCLEAR POUER STATIDfJ, UNIT 1
F Security, medicali emergency (. fire protection plans
8210040120 Discusses util compliance ui/SEP Topic VIII-3 0, "DC Pn
Siji But Voltage Monitoring & Annunciation "Sufficient
monitoring equipment provided in control room or locallij to
alert operators of dc sijs trouble No mods needed
CDUM5I4..H G Northeast Nuclear Energy Co (subs of Northent
Utilitlesl COUfJSIL.H G Northeast Utilities 82/09/23
CKUTCBFIELD, D Operating Reactors Branch S 3pp 15591 204
Flche 50-245,03/09/23,3210040120
Forwards IE Imp Rept SO-244/82-1Q
noncomp liance noted
STAR05TECKI.R Division of Project
KAlEfi.J E Rochester G*s i EUctn
Fiche 50-244, 02/10X14, S31O290I7I
020901-093O No
Beslilent Programs
Corp 2pp 15953
B210210182 Forwards IE Insp flept) 50-345/82-17 (. 50-334/BS-I9 on
B2 080 0-0925 No nnncompl iance noted
STAHOSTECK1.R Division of Project t Resident Programi Viif 10/0/
COL/WSIL.U Northeast Nuclear Energy Co (subs of Northlt
UUIitifs) 2pp IS766 041 24X Fiche 50-245, S2/10/07, SS10BIOIDJ
-8210290173 IE Insp flept 5O-244/82-I8 on fl309Ol-0930 No noncompl lati
noted Major areas inspected plant operati ons, survei 1 lane fl
te-s 1 1 ng> LERs, 1 1 censed ' nonl i censed employee- training
programs I, follouiuo ot TMI lessons leained implementation
z innEisrwjpf? p , BAUNACK,WH . KISIER.HQ Division OP project t
Reiiilent Programs 83/10/13 llpp I5B53 290 24X
Ficjie 50-244.Ba/10/14.9310290l7
B2102IOI96 IE Imp Repts 50-24S''B2-I7 fc 50-336/02-19 on SSOllOU-OWB *.
noncompliance noted l-fajop areas inspected plant ti refueling
op era 1 1 onii equipment alignments b read iness. rad iatlon
protection ti physical security
SHEDLOSKV. J T , LIPINBKI.Dfi . ELASSER. T C Division ot Pra/rct I
Resident Programs 02/1O/05 ISpp 18766 043 24X
Fiche 50-245. 82/10/07, H2102I01B3
2102'?0212 AcV receipt of 821015 llr informing 1IRC of steps taken tn
correct violations noted in IE Inspfjcpt 50-344/B2-15
SrAROBTECKI.R Division of Project t Hetident Program! B2/IO/25
rtAIER.J E Rochester Oa i J, Electric Corp Iji 13853 27*} 24X
Fiche 50-214,03/10/25,0310270212
-8210290217 Rc-iponds to IJRC 830914 Itr re violations noted in It Insp
Bept 50-244/02-15 Corrective actions lituation reviouetf
! determined to be isolated case Further action unnecessary
MftlER. J E Rochester Cas fc Eloctric Corp B2/IO/15 EJBUMNER.E J
Region 1, Office nF Director 2pp 15B93 2BO 24X
Fiche 50-244, B2/IO/25, B2I029O212
P Operatinj license stage documents tt correspondence
8310010312 Rea.uts that processino of S2OB1S license amend ppl
b postponed Revised application changing radiological
effluant Tech Specs mill be docUted on or about 021113 for
both facilltir*
COUNaiL.M Connecticut YanfceB Atomic Pouter Co CClUNBILp H
Northeast Nuclear Energy Co dubs of Northeast Utilltlnil
COUNBIL.H Northeast Utilities 02/09/22 CLASH, H A Optr
Reactor* Branch 3 CRUTCHFIELD. D Operating Reacton Brunch B
3pp 1S&74 047 24X Fiche 3O-000, B3/09/22, 9210010312
B2100S01IB Forwards summary of differences For SEP topics b diKrl
of (ntendirf actions Schedule provided for topics, requiring
addl Info Topics will o addressed in detail in topic-
ipec 1 f ic correiipondeno
COUN8IL.U Northeast Nuclear Energy Co (subs of Northeast
Utilities) COUN9IL.U Northeast Utilities S2/09/2S,
CRUTCHFIELD, D Operating Reactors Branch 3 40pp 1 5i04 IBS
Flche 5O-34S, B2/09/33, 82100501 IS
B21001O320 Summarij of BH0915 meeting u/util In Bethesda, MD- rl fDil
Cdmbvt Ib le g*s control evaluation - fuel/clad gap iodln*
release, vs uater rjdiolijsts rat's Calculati onal methoddlagv
pruented in util 6 20 BOA submittal acceptable
SHEA. J J Operating Reactors Branch 5 B2/09/23 Qpr*Un)
Fcaactors Branch 3 6pp 15974 040 24X Fiche 30-249,02/09/33.
Q210O103SO
0210050177 Comments on NRC evaluation of SEP Topic V1II-2, "Emirgtnii
Ortsite Power Sv* " Protective trips of gas turbine
interlocki sihould -be bypassed under accident condition*
unless bypassing trip would result In machine destruction
COUNSIL.U NortJiBjst NucUar Energy Co dub* of rJortheait
Util itiBs) COUMBIL, W O Northeast Utilities 88/09/27
CHUTCHFIELD, D Operating Reactors Branch 5 4pp 1 3603 330 3*1
FicK" 30-B45, aa/09/a7i8aiOOSO177
8210040233 Inform that SEP Topic V-6, "Reactor Vassel InUgritv."
mtiti current criterl* Evaluation mill be basic input to
integrated safety assessment for facility,
SHEA, J Operating FJactor> Branch 3 BS/09/S9 COUNSIL.H
Northeast Nuclear Energg Co (subs of Northnast Utilitltl) Sip
159B1 360 24X Fitbe. SO-24S, B2/09/29i aai0040233.
DOCKETED ITEMS
35
e310Q40S'3 Informs that licensee response to Item (a) of NRC 83062B 1 tr
rr SEC Topic iII-5 D, 'Pipe Break Outside Containment,"
acceptable NRC draft evaluation factually correct Si
considered final NRC evaluation of topic
StIEA.J Operating Reactors Branch 5 83/09/39 CQUNSIL.W
Northeast Nuclear Energy Co (subs of Northeast Utilities) 3pp
15537 135 24X Fiche 50-245, B2/09/29, 8210040293
SH10Q6aO<ia Comments on HRC
aJuation of SEP Topic 1II-4 D, "Tur
provide assurance that turbine missiles not safety concern
COUNSIL.U Northeast Nuclear Energy Co (subs of Northeast
Utilities! CQUN5IL.WG Northeast Utilities 82/09/29
CflUTCHF IELD, D Operatsng Heactois Branch 5 2pp 15614 332
Fiche 50-245, 02/09/29, B210Q6004B
6210060094 Responds to open items identified in 820630 safety
evaluations for 6EP Topics IEI-6, "Seismic Design
Considerations" & IM-11, "Component Integrity " Corrections
4 status of IE Bulletin 79-14 program mods cncl
COUNS rL . U Northeast Nuclear Energy Co (subs of Northeasl
Utilities! CQUNSIL.H Northeast Utilities B3/Q9/29
CRUrCHFIELD. D Operating Reactors Branch 5 9pp 156(5 O13
Fiche 30-245. 62/09/2?, B2I 0060094
24 X
5210390-105 He-spanils to request for estimate of amount of Iodine
released to coolant following LOCA Total earn inventory of
iodine, botti staile ft radioactive i sotopes. a pproi 10 tg.
uj/var i a t 1 an depending an fuel burnup
HULMAN.L G Attident Evaluation Branch B2/O9/29 CRUTCHFI ELD, D
Operating Reactors Branch 3 3pP I S063 307 24X
Fiche 5O-245, 33/09/29. B21O290403
fi21OI503B2 Advises that gas turbine generator bldg can adequately
resist design basis tornado load i ngs, per SEP Topic III-2 re
'.und 6 tornado loadings Technical evaluation rapt t- final
SEW enc 1
ShTA,J Operating Reactors Branch 5 03/09/30 COUNSIL, WO
Northeast Nuclear Energy Co (subs of Northeast Utilities) 9pp
35710 241 24X Fiche 50-345. B3/O9/3O. B2JOI 503G2
92-06530020 'Wind ti Tornado Loadings," technical evaluation rept
BARRETT, D J , AOARWAL.H Franklin Institute/Franklin Research
Center NRC-O3-79-1 IB TED-C5257-403 82/06/21 PERSINKQ, D
r.RC - No Detailed Affiliation Given ISOpp 15710 2S4 24X
Fiche 50-2-45, 02/09/30,9210150332
0210130331 Discusses revision of admin i strati ve procedures to
incorporate revised working hour guidelines fc provisions
for authorizing deviations per B2020B i- 041 3 requests, TMI
It-em I A 1 3. "Shift Manning" (. Generic Utr B2-I2
COUNSIL W G , CrtONETTA J P Northeast Nuclear Energy Co (subs op
Northeast Utilities! COUNSIL. W O Connecticut Vankee Atomic Power
Co B2/1O/OI EISENHUT. D G Division of Licensing 3pp
15679 127 24X Fiche 30-000,92/10/01,6210130331
S21O130O93 Forwards request for addl info re containment purge & vent
operabllity (H-24) necessary to complete revleui
CFIUTCHFICLD. D Operating Reactors Branch 5 B2/10/OS COUNSIL, U G
Northeast Nuclear Energy Co (subs of Northeast Utilities) 4pp
15673 115 21X Fiche 30-345, 02/10/03. B2101 30093
B31O130326 Comments on proposed scope of Phase III of SEP as reflected
in indtvidual topic definitions appended to 020909 1 tr
Staff encouraged to develop J. implement means to incorporate
positive attributes of Phase III in licensee/NRC interface
KACICH.H rl SEP Ouners Group 62/10/07 EISENHUT, D Division of
Licensing 7pp 15693 179 34X Fiche 9Q-OOO, 02/10/07, 83101 30326
82I02S04B6 Forward* Final evaluation of SEP Topic VI-fl. "Containment
Isolation Sy-s >' Deviations from review guidelines listed
Implementation of administrative conlrols on valves
recommended
SHEfc.J *1 Operating Reactors Branch 5 B2/IO/OB CDUNBIL. W
Northeast Nuclaar Energy Co (subs of Northeast Utilities) 34pp
15779 03t 24X Fiche 50-345: B2/IO/OB, 8210320486
9210270200 Forward* summary of NRC positions on 26 unresolved safety
is-suts. tons! t ti ng of eicerpti from NRC publication* t, repti
to Congress fc assessment of generic applicability Adequate
basis ciiati to warrant continued plant operation
COUWSILiW . OPEKA. J F Connecticut Yankee Atomic Pouer Co
CDUNSIL.M G Uortheast Nuclear Energy Co (subs of Northeast
Utilities) 82/10/13 CRUTCHFIELD.D Operating Reactors Branth 5
5Hpp 15921 354 24X Fiche 50-000. 02/10/1 3, B21027O200
a2102AOI94 Discuss" utik review of rod control circuitry No credible
single -failure could coule inadvertent movement of more than
on* control rod at time Info should resolve concerns r
SEP Topic 1V-3, "Reactivity Control Sys "
CDUNBIL. W G Northeast NucUar Energy Co (sobs o# Northeast
Utilities) COUNSIL, U G Northeast Utilities 82/10/14
CRUTCMFIEU), D Operating Reactor* Branch 5 2pp 13799 019 24X
Fiche 50-245. B2/10/14 9210360194
921O2&0414 Provides addl info re 2-phase degraded grid unoervDltage
protection scheme for Class IE pouier sy< in response to
820623 renuest Mods uill be deferred until 1994 refueling
outage Next rept uill be submitted during Jul 1983
CQUNSIL.W Northeast Nuclear Energy Co (subs of Northeast
Utilities) COUNSIL.W G , QPEKA, J F Northeast Utilities
82V10/I4 CRUTCHFIELD.D Operating Reactors Branch 5 6pp
13B06 H4 24X Fiche 50-245,83/10/14.9310260414
931O250134 Forwards draft Integrated plant safety assessment rept Dr.ift
provided for SEP Subcommittee 931026-27 meeting
CRUTCHFIELD.D Operating Reactors Branch 5 82/1O/1S CQUNSIL.W O
Northeast Nuclear Energy Co (sub* of Northeast Utilities) 79p(i
157B? 1A4 24X Fiche 50-245, S2/10/ 15, 82102S0124
B31O260519 Forwards proprietary "9TR Bundle Submi ttal, Mi 1 1 stone-1
Segmented Test Rod Dundle,Suppl 6," as app to 921015 Reload
B license amend submlttal Rept withheld Iref 10CFR2 790)
CDUNSIL.W O . OPEKA.J F Nortneast Nuclear Energy Co (subs of
Northeast Utilities) COUNSIL.W Q Northeast Utilities 83/10/19
CRUTCHFIECD, D Operating Aeacton Branch 5 3pp 15305328 24X
Fiche 50-243,82/10/15,521026051?
luation of SEP Topic III-l,
Syn, " in response
8210260459 Forwards corrections to draft ev
"Classification of Struc tures, Components
to 820505 request
COUN3!L,W 6 , BISHOP, R W Northeast Nuclear Energy Co (subs of
Northeast Utilities) COUNSIL, W G Northeast Utilities 82/10/17
CRUTCHFIELD.D Operating Heacton Branth 5 13pp 15H06 310 S4X
Fiche 30-345. 02/10/19. S3I 0260459
9210250319 Advises that SEP Topic Vl-6 "Containment Leal Testing,"
considered complete to conduct integrated assessment
Multi-plant Item A-4 rev leu will be conducted independent of
SEP
SHEA.J Operating Realtors Branch 5 82/10/22 COUNCIL, W
Northeast Nuclear Energy Co (subs of Northeast Utilities) lp
1578B 34-) 2<1X Fiche 30-245, Q2/10/32, 821O330219
Inspection reports, IE Bulletins ! correspondence
8210060233 Advlsei that masonry uall mods uii 11 be complete by Nov 1982
& const will be completed by June 1983, per IE Bulletin
80-11
COUN8IL, W C Northeast Nuclear Energy Co (subs at NortdSJSt
Utilities) COUNSILiW Northeast Utilities U2/09/24
HAyfJEB, R C Region 1, Office of Director 2pp 13620 DOS 24X
Flche 30-243, 02/07/24,0210060333
821015069? Foruards req.uest for addl info to complete review of SOllO-1
response to IE Bulletin HO-11, "Masonry Hall Design "
Response eipicted within 60 days of 1 tr receipt
CLARK, R A Operating Reactors Branch 3 BS/O9/2S COUNSIL. M
Connecticut Yankee Atomic Pouer Co COUNSIL, WG Northeast Nuclear
Energy CD (subs of Northeast Utilities) 13pp 13716 IOO 24 X
Fiche 30-000,93/09/29,9310150699
82100600HB Comment* on NBC evaluation of SEP Topic III-4 B, "Turbine
Kissilis " Current insp & testing schedule* adequate to
provide assurance that turbine missiles not safety concern
COUNSIL. U G Northeast Nuclear Energy CP (aubs of Northeast
Utilities) CQUNSI1.,H Northeast Utilities 82/09/29
CRUTCHFIELD.D Operating neactari Craned 5 2pp 1S614 332 34X
Fiche 50-243i B2/09/2 1 ?, B210C-6004S
8310070332 Ac k receipt of 820914 1 tr informing NRC of steps taken to
correct violations noted In IE Insp Rept* 50-245/02-10 !<
50-336/92-14
MARTIN.T T Division of Engineering i Technical programs 82/10/05
CQUNBILrM G Northeast Nuclear Energy Co dubs of North "flat
Utilities) lp 13634 051 B4X Flche 30-343, B3/1O/03, 9210O703S2
8310070356 Responds to MRC 820313 Itr re violation* noted In It Insp
R*pts 50-243/B2-IO l> 30-336/93-14 Corrective actions
controlled documents updated >/ Unit 1 control roan drawing
deficiencies corrected
COUNBIL.U G Northeast Nuclear Energy CD (subs of Northeast
Utilities) COUNSIL, W Q Northeast Utilities 3/09/14
MARTIN.r T Division of Engineering & Technical Programs 3pp
IS634 033 24X Flche. 5O-345, 02/10/05, 0210070352
82081*70233 IE Info Notico 80-35. Sup pi 1, "Leaking ft Dislodged 1-135
Implant Seeds " Bvc list ncl
COBBrL I Diviilon of Fuel Facilities. Materials & Safeguards
82/10/06 Consolidated Edison Co, of New Vort 6&pp 13761 2SO
24X Fich 30-000. S3/IO/06, B20BI90333
9210210182 Forwards IE Imp Repti 50-243/B2-17 d 50~336/82~1? on
B3080Q-0923 No noncompl iincn noted
STAR03TECKI.R Division of Project tt Resident Programs 63/10/07
COUNSIL, W G Norehiast Nuclear Energy Co (subs at Northeast
Utilities) 3pp 15766 041, 34 X Fiche 30-345, 93/10/07, B31O31018S
36
DOCKETED ITEMS
8210210(96 IE Insp Septs 50-2-15/82-17 i 30-336/02-1^ on B20BQB-O925 MD
non compliance noted Hajar art at inspected plant ! refueling
oper at ions, eqii 1 pment a I ijnmenti b riadlnessiradiation
protection & physical security
5HEDLOSKY, J T , L1PINSKE.D R , ELASSFB, T C Divliion of Project t.
Resident Programs 62/IO/Q3 I5pp 15766 O43 24X
Fiche 50-345,82/10/07,9310210183
IE Bulletin B2-03, "Stress Corrosion Cracking in ThiEl-
Wal I. Large-Diane ter. Stainless Steel. Fee ircu I ation Sy
Piping. at BUB Plant* " Svc list end
DEYQUMQ.R C Director's Office, Office nf Inspection and
Enforcement B2/IO/14 Conjolidated Edison Co of New Vor I
Il5pp 15910 1H5 24* Fiche 50-000,82/10/14,9209190236
B2 10220479 Notification of 831039 meeting u/v 1 1 1 in Bethe Ida, MD to
discuss spray sparger crack Indications detected during
visual insp usina underwater television iquiptnent
SHEA, J J Operating Reactors Branch 5 B2/10/21 CRUTCHF1ELD. D
Operating React-on branch 5 3pp 15779 0-75 34X
Fiche 50-345. 62/1O/31. S2102ZO479
S Reportabte occurrences, LERi & related correspondence
B21OQ1Q009 Responds to FGIA request tor 19 categories of documents re
nuclear reactor events fi lafetig .problems Forwards Hocumentt
1 1 sted I n App A
FELTQN.J M Division of Rules Jnd Records B2/Qfi/2S UDELL, R A
Critical Masi Energy Project !5pp 13727 005 94X
Ficlie 30-OQO, sa/OA/aa, B210010008
8103190719 Operating Reactor Event Memo Bl-29 re cpacking in several
ASI1E Code Class 1 & Class 3 piping sy> Affected su. are
isolation c ohdensori shu tdomh tool ing. cleanup d LP I
subsystem Defective sections are under repair
EISEIJHUT..D Division of Licensing SI/03/05 VdLUMEflifl
Division of Engineering flpp 15738359 24X
Fiche 50-000,82/06/23, B2100IOOOO
931QOBQ015 Addk response to FOIA request for 19 categories of info ro
nuclear reactor events ( safety problems Forwards documents
lifted in App A Documents In App 8 eomp late lij withheld <ref
FOIA Eiemp t Ion 5)
FELTOU,J M Division of Rulm and Retards 83/07/12 UDELL, Fl A
Critical Mass Energy Project 9pp 1 5663 O37 S4X
Fiche 50-000, Ha/07/12, 92100SO01 5
830607010;, Dperatinfl Reactor Event MB mo 83-01 re 010910 reactor scra
u/uater banner evnt Study of Unresolved Safettj Issue A-l
shoui'S no other water hammer event* In BHfl Isolation
condens-ara
EIBEN>llJTiD a Division of Licensing B2/03/35 VDLLflEfl, R H
Division of Engineering HATTeON, R J Division a? a-ystems
Integration (post 811005) HAHAUER , S H Division of Safety
Tschnologu 7pp 156i3 ISO 24X Fiche 50-000,33/07/12,
B210C3QOI5,
6210070360 LER QS-01Q/OIP on e30?25,uhile p*rPormlng remote vitiml ttisp
at core spray spargers, tract Indication identified on one
core sprau sparger to junction toi urldi.Addl info ull 1 be
pravi-dfd in 1 fl-daij follouutt rept
MROCZKA, E J Northeast Nuctear Encrjy Co Cubs of Northeast
Utilitieel HROCZKA- E d hfarthvast Utilities B2/09/a7
HAVfJES.R C Region f. Office of director Ip 15634 059 BVt
Ffche 30-24S, 02/09/27.0310070360
B2102H)130 LR B3-01S/01T-0 on B3Q935, crac k indication itfentifltd ei
one core spraij iparger to junction boi uifld Caused bij high
itiel-d residual stresses Stress corrosion cracking iridij have
initiated indication Sparger hold clamp will be installed
Thin-L.T S Northeast Utilitim H3/10/12 Region I, llffLt* *l
Director Ip 137A3 OB9 24X Fiche 30-345, B3/ IO/ 13,
9310220103 Forward* LER 02-O21/03L -0 Defailed event analysis e
rWOCZKA, E J Northeast Nuclear Cnergy Co (suhs of Northea
Utilities) KROCIHA.EJ Northeast Uci 1 1 1 les 62/lOVin
HAVNEa.R C Region 1, Office of Direttor 2pp 1577Q Iftf
Fiche 50-2H5. B2/1O/13. 0210220103
--B210S2010S LER 32-021/03L-0 on 030913. d less I generator Iri^H ^un
operational readiness demonstration test Caused bij brolon
nnj tijpe mire Iu9 at current transformer secondary
connection due to FLeung during installation
THJLL, T S Northeast Nuclear Energy Co (subs of Northonit
Utilities) B5/10/13 Region 1. Office of Direr tor Ip
I577B 171 aflX Fiche 50-245.62/10/13,8310230103
821O22OII2 Faruards LER 62-020/011-0 Detailed event analgm ( m i
KRQCZKA.E J , MRDCZKA. E J Northeast Nuclear Energy Co Hubs of
Northeast Utilities* 82/10/15 HAYNES. R C Region 1, Uffic* of
Director 3p p 1S778 164 24X Fiche 50-245. B3/ IO/1S. OSmJJi) | I .
--B2102201I4. LER B5-020/01T-0 on 620930, four ITT Online] ) mulhlinrn 4i
to fall uithin recormnended range Fui ther analysis shuupd
that only one inubber Failed design acceptance range (.annul
hi| oil (callage through cracked reservoir
THULL,T B Northeast Nuclear Energy Co (subs nf riorlhujtl
Utilities* B3/10/15 Region l< Office of Direcio, in
S577fl 167 24X Fiche 50-249,92/10/15,0210220112
6210220195 Foi-uardi LER 02-019/01T-0 Detailed event an,al 41 it tin l
HnaCZKA.E J Northeast Nuclear Energy Co (subs of Morthe*t
Utilities) MRdCZKrt. E J Northeast Utilities G2/ia/i<i
H(VYNES,R C Region 1, Office nf Director 2pp 15/// ,/() ,'tt
Fiche 50-245,92/10/15,8310320191
-SS10220201 UER 32-Olfl/OlT-O on 920928, five safotij leliiif vd1v
to ctpen at requlrfld setpolnt Cause being invest Iga tfi) bu W
Two valves uilll be replaced or rebuilt Other three uill bo
remarked t> retested
THULL, T S Northeast Nuclear Energy Co (subs nf Unr irndi
UtllUies) a2/IO-/15 Region I. Office of Dirtclor U
13777 272 24X Fiche 50-245, 02/10/ 1 5- 0310930195
DOCKET 5Q-S47 INDIAN POINT STATION, UNIT 2
F Security, medical, emergency 1 fire protection plant
B210Q-6.0149 Forwards "Testing t Repair af Blren Portion of Mrt N
Not 1 f itat ion Sijs for Indian Point Nucloar Pamer Gonor.i 1 1 nj
Plants" per tfjicusston at Q2090B status meeting
KELLV.J J Poujftr Authority of the State of Neu Yorl Kiitfi'H l'>
DAVIDDFF, B NSW Yorl, State of Ip 15611 E99 3<U
Fiche 30-247, 92/09/15,6210060145
~B-al00601il8 "Taatina & Repair of Slron Portion oF Alert b
Bys fnr Indian Point Nuclear Pouer Generating Plani "
i Pouer Authority of the State of Neu Vorfc Q3Jai/\4
13&I4 396 24X Fiehe 50-247, B2/09/ IS, B2100i0145
9210070-304 LER 32-019/01P on 830938, three safety, re! to* Valve* failed
to open at required setpoint pressure during bench test
Cause under invistigat i on Three remaining tafety relief
valvii uill be removed tt bench tested.
MROCIA.E J Moi-theast Nuclear Energy Co (subs of Northeait
Utilities) UROCZKA.E J Moi-th&ast Utilities 82/09/29
HAYHE8.R C fiegton lj OfflC of Direttor Ip 15634 245 24X
FiClie 50-243, 82/09/29. 6310070304
921O070250 TOetopu messioe of LER 82-020/OLP on 830930, ITT OHnnell
snufcbers failetf loctup . bl*tl rafce renuirements Snubbers
(uitl be m*ds operable a r replaced prior to reactor startup
MRDCZKA, E J Mortlnist Hueltar Enerau Co Isubs of Mnrth*s t
Utilities) MROCZHA.E J Morthest Utilities B2/JO/01
HAVNESj R C Region I- Office of Director U 15634 287 21X
Fiche- 50-243, 82/10/01,8310070380
flai031t)4S3 Foruardl LER B2-01B/01T-0 D-t.iUd ivint analysis incl
HROC2KA.E J Horthtait Nuclear Energy Co (subs of Northitist
UtilitletJ. MfiaCIKA.E J Northeast Utilities 82/10/12
HAYNEa.R C. Region Ir Offit. af Director, 2flp IS7i3 OB7, 24X
Fiche 50-B4B, B2/ 10/12- BBIOEI0423
S2102BOHa Releases public Version of revised emergoncg plan
imp lemintliig prociduroi
F ELTON, J M Division of Rules and Records 62/10/12 Dncu
Manajement Branch Ip 1 5Bi3 271 24X Fiche M>-Q(KJ, (\U/ |(>/ 1 j
6210260145
82I02S0154 FoTuardi public vertlon of revisions to Emergen<v J'
Implementln-j Procedures IP-1020 re airborne radioiodtn*
determination t, IP-1046 re util personnel respDiis Ibl li t lit
during Unit 3 emergencies
O'TOOLEjJ D Consolidated Edison Co of New York SJa/lO/O!
HAVNEB.R C Region I, Office of D( rac tor 3pp I9DA3 tf'J
Ficha SO-OO3, B2/10/I2.B2102SOHB
621028013? Public version of ^.visions to Emergency Plan Inp]
Procedures IP-l&ao re airborne radiotodine datermlna t Ion i
IP-10"IA re util personnel rtsponsib 1 1 itins duri"B Unit 3
intergenc; ins
Cotnolitfated Edison Co of Neu York 92/09/01 ll,tp
1&962 275 SIX Fiche 50-003,62/10/12,0210200149
DOCKETED ITEMS
37
Advises that serious deficiencies in emergency preparedness
will not, be corrected since State of lit 4r FEMA not
addressing concerns of local officials by involvement in
c urr ent f. hang ts
HOLT, J Public Interest Research Croup. New York PDSNR,P
Parents Concerned About Indian Paint FLEISHER. Z S West Branch
Conservation Association 62/10/15 PAULADINO, N J , AHEARNE, J F ,
GIlltJSKY V Commissioners 5p p 15755 OS3 24X
Fiche 50-217. B2/1O/15, 9310200019
8310200019 Advises that serious deficiencies in
mill not be corrected since State of NY & FEMA not
addressing concerns of local officials 6y involvemei
current changes
HOLT, J Public Interest Research Group. Neiu York
Parents Concerned About Indian Point FLEISHER. I S
Conservation Association 03/10/15 PALLADINQ.N J
QILINSKY.v Commissioners 5pp 15755 OB3 24X
Fiche 50-247, B2/10/I 5, 9310200019
gency prflparednt
PQSNER. P
West Uranc
ft d j ud i
Act receipt of 800416 memo u/inap repts verifying inteiim
na required of facilities in 8O02I1 confirmatory
s Requests verification that Item F 2 in orders is met
E 5 in U Gammill 800317 memo should be F 5
, T 11 A5sistant Birector for Operating Heactors GO/06/13
,S E Division of Reactor Operations Inspections Ip
29-5 2-1X Fiche 50-?'I7, BO/O6/O3, S0062307SB
eilO060235 Declines invitation to appear before Subcommittee on
Energy Conservation '< foiuer Sub tommi t tee investigation is
intrjsicn into ongoing regulatory proceeding i, threatens
independence of Commas.! on
MORGAN, C Morgan Associates MORGAN. C P uuier Authority of the
St^jte or Meu York 02/09/30 QTTINQFR.R L House of Rep , Energy
Cqinnerce lOpp 15619 360 24X Tiche 10-247, 82/O9/3Q, B210060235
[1^1.0040109 Order CLI-82-201 r eques 1 1 ng ASLU reconstituted by
C.LI-S2-24 to estimate uhen recommendations called for bg
Ct.l-81-aa can be provided
C*HLH,S J Office of the Secretary of the Commission B2/10/01
Atomic Safety and Licensing Hoard Panel Ip 15560 350 SAX
Fiche 50-217. 92/10/01,82100.10109
83102203B9 Subroittal of comments on ASLB B21001 mem or an li urn ft o
motion for ASLQ to Issue reformulated contentions on
Commission Questions 3 te 4 by 331115 i to restore
Contention 6 2 Certificate of Svc enc 1
TQSCANI.K Parents Concerned About Indian Point 83/IO/lS
Atomic Safety and Licensing Board Panel 2pp 15777 307
Fiche 50-247, 92/10/15,8210230339
621O2I0370 Requests destruction of Uest Branch Conservation Assor
821011 reply to B21001 memorandum t, order !> substitution of
enc 1 veri ion
FLEISHER, Z B West Branch Conservation Association 92/lO/lB
NRC - No Detailed Affiliation Oiven Ip 157i4 099 24X
Flihe 90-247, 82/10/19,6310210390
B210210397 Response to B21O01 memorandum fc order Certificate of Svc
enc 1
FLEISHER. Z B Uest Branch Conservation Association 82/1O/13
4pp 157A4 100 24X Fiche 50-247, B2/1O/1B, 8210210390
310200059 Response to AELQ 821001 order ASLB should narrow language
01- ASLD Question 1 1 ! adapt proposed schedule for
continuation of proceeding Certificate of Svc end
MDi3RE,J . MCOURREN.H J Hearing Branch 1 B2/1O/19 9pp
15757 290 24X Fiche 50-247,62/10/19,8210200059
Mcrrorandumi order icslating contentions & establishing
procedures based on Commission guidance
uLEAEDU. J P . PARIS. O H , &IIDN. F J Atomic Safetij and Licensing
Hoard Panel 02/10/01 '12pp 15609 311 24X Tiche 50-247.
tlSJ [0/O1 , B2I0050254
n2iO]30335 Motion for A&LI) to direct NRC to reschedule B210I3 meetinq
ui j u(,ils '. Bandia in Alo uijuorque. (JM to either New Vort.NY or
1,'a ih ing torn DC Intervenar unable to attend meeting In Nil
W&ISS.E I? Union of Concerned Scientists WEISS, E R Public
Interest Research Ordup-, New York H2/1O/07 Atomic Safety and
Licensing Board Panel 3pp 1 S6S2 OSQ 24X Tlche SO-S47, H2/10/O7,
3310130335
- -O21-0130337 Motion for Commission to direct that all future meetings on
IS5UBS be held in NY o' Wash i ng ton. DC 1 that intervenors be
given notice concurrently u/other parties
I^EISS.E R Union of Concerned Scientists WEISS. E fi Public
Inte.ost Research Group. Neu York S2/10/07 Comm! saionori
2pp 156S2 033 24X fiche 50-2-17. B2/IO/07, B2IO1 30335
. Reply to ASLG B3IOOI memonandum fc order Plant should be
totally reinspected u/appropi la te testa Of pi p ing. e I ec tr ical
', tqntrol SMS conducted List of parties should bo shortened
to active participants Certificate of Svc enel
FLCISH^f),! S West Branch Conservation Association B2/10/I1 'Ipp
1S7IB !?! 34X Fitho 50-247, 02/10/1 1 , 8S1Q1SQ203
Order denying UCS/NY PIRC B31O07 motion to direct NRC to
reschedule B21013 meeting in Al bunuerque, NM to NY or
Wa sh ing t on, DC Only Commission has jurisdiction over NHC
porrormance of administrative responsibilities
PfiRIS.D H . SHON.F J , GLEABDfJ. J P Atomic Safety and Licanainf)
Uoard Parvet B2/10/12 Union of Concerned Scientists 3p p
L3701 194 34X Fiche 50-247.02/10/12,9210150092
S21022Q375 Request for nod of ASLB 8210O1 order, to permit Roe Han*
County to continue presentation of witnesses re Commission
Questions 314 prior to taking evidence on Questions 1,2.S.
6 t, 7
THORSEN.E D Rack land County, NY 92/10/19 Atomic Safety and
Licensing Board Panel 2pp 15779 187 24X Fiche 50-247,62X10/19.
B2 I022037S
B21O2HO'1IO Joint response of inlervenors to ASLB B2100I order Meaning
of "discussion" of probability should be clarified & ASLD
should immediately reformulate contentions on Questions
3 fr 4 Certificate of Svc enc 1
UEIBS.E R, Union of Concerned Scientists HEISS, E R Harmon J.
Weiss B2/10/19 Atomic Safety and Licensing Board Panel I3np
1577S 313 24X Fiche 50-247, 62/10/19. B210220410
B21O250031 Proposed hearing schedule Certificate of Bvc end
GfiANBENBURO. D Consolidated Edison Co of Neu York MORGAN, C
Pouer Authority of the State of New Yorl MORGAN, C Moroan
Associates B2/10/19 9pp 15797 049 21X Fiche 50-247, S2/ 10/i9,
B2I02500B1
82102502I& Response to ASLB 931001 order reformulating contentions
Opposes admission df new Contention I 1 , Content! ons 2-l(a)-
(d),2 2<a> & 2 2<b> ^ ASLC Question 2 2 1 Notice of
appearance % Certificate of Svc encl
MGRQitN,C Pouer Authority of the State of New York MORGAN, C
Morgan Associate* 82/10/19 Atomic Safety and Licensing Board
Panel 35pp 1S7B9 166 2flX Fiche 50-247,93/10/19,9210250216
8210290265 Notice of appearance in proceeding
BAUM,B L Power Authority of the State of New York
Morgan Asfociatet B2/10/19 Ip 15791 153 24X
Flch 50-247. 82/10/19, B21Q3S0265
3310150141 Order scheduling B21 103-04 prehearing conference in Whitp
P]ainsiNY re oral argument on responses to ASLQ S2IOOI
memDrandi/m ( order restating contentions
GLEASON. J P Atomic Safety and Licensing Board Panel B2/10/13
2pp 1569B 306 24X Fjche SO-247, 82/10/13- B310I 50141
Motion in response to ASLB B21001 order, reques t ing
clarification i importance of term "d i ECUSB Ion" & eitension
of time to determine position re Issue of consolidation
Certificate of Svc encl
KAPUAM. C Neu York, NY 82/10/13 Atomic Safety and Licensing
Board Pjnel 7pp 1S719 123 24X Fiche 50-247, QS/IO/1 3, B21 01B013B
9510200069 Telegraphic order granting licensee reo,uest for e'tenaior of
t l.n& to file responses to B21OO1 order All party responses
due B2I019
GI.EASOH.J P Atomic Safety and Licensing Board Panel B2/10/I4
Pojtr Authority of the State of Neu York Ip 15757 2BO 24X
Fjche 50-247. 82/10/14, B210300069
B2102502B7 Motion for order reversing ASLQ B31001 memorandum fc
order re taking of testimony on Questions 3 d 4 Ii
establishing schedule for presentation of testimony upon
expiration of 120-day tloeft Certificate of Svc encl
VETERE.L A Hettchester County, NY B2/10/1? Atomic 8Sfe-tg and
Licensing Hoard Panel 7pp 13791 165 24X Fiche 30-247,63/10/19.
8210250287
B2102S03S4 Memorandum re ASLB B21001 order reformulating contentions
Object i to neu Contention 1 1, Bases la & 111 , Contentions
S l(a),2 Kb), 2 Kc),2 Hd>,2 2<a) S< 3 2(b) Certificate of
Svc end
BRANDENBURG., B Commonweal th Editon Co B2/10/19 Atomic Safety
and Licenoing Board Panel 49pp 15790 243 24X
Flch SO-247, B2/10/19. B210250324
S2102SOQ99 Motion fur leave to file memorandum in reponte to ASLD
B31001 order 1 day lati Mechanical difficulties encountered
iii/uord processing iquipment Certificate of Svc encl
BRANDENBURG* B Consolidated Edison Co of New York 82/10/20
CnmmisiionBri 6pp 15787 062 24X Fich SO-S47, B2/ 10/20,
B21O2S0099-
38
DOCKETED ITEMS
6210200242 Requ e-sta Cnmraiss i on issue" order directing all meetings
between NRC t licensee be held Ih Wash irig ton, DC or NY. that
intervanori receive notice of meetings cone urrently u/utils
fc that intervenors be provided u/minutel of 821013 meeting
WEISS, R Harmon i Hem WEISS, E fi Union of Concerned
Scientist! aa/10/25 PALLAD1TO.N J , AHEARNS, J , QILINSKV, V
Ccn-.-nissioners 2pp 15337 05B 34X FUho 50-347. B2/ 10/23,
B2102BOP42
93103BQ330 Advises that NRC does not intend to respond to intervenor
motions filed in response to ASLD 621001 order until after
021103-0-1 preparing conference
MOORE. J E Hearing Branch 1 S2/JO/27 GLFA3ON. d P . SHQM, r J .
PARIS, D H Atomic Safety any Liceniing Board Pane] Ip 15FJJ7
24* Fuhe 50-247,92/10/27.8310260230
8210290353 Response opposing UC3/NV P1RO 091012 motion to direct NRC
reschedule all future nettings an hearing Issues In NY or
Mashing ton. DC NRC should be permitted fleiiblHty to
detsrnln-e most appro-priat e location U/Certi f icat* of Sv<
KCGURREN.H J Hearing Branch I 93/10/27 Commn* ( oners 9pp
I3B39 04B 24* Fiche 50-247,82/10/37.0210980353
S21Q2W271 Advises that, licenioes plan to address all mat ten raisoi]
responias/mot loni re ASLB H2I001 memorandum & order at
B31103-Q4 prehearlng conference
DRANDENBUHO. B Cgnsol Ida ted Crflson Co oP Hem York MORGAN. C
Pn'Jer Authority of the State of [Jeiu York MORGAN, C Morgan
Asiociatei 33/10/27 GLEASOW.J P , SHON. F J , PARIS, H Atomic
Sjfetu and Licensing Hoard Panel 2pj> 15BB3 01 a P4X
Fiths 50-247. aa/10/a7,BaiOS90271
H General correspondence
B0073IOI17 Forward* request for add! info requirad to complete Irani),
fleiearch Ctr evaluation of adequacy of steam generator Si
reactor coolant pump supports Request should be sent to
I icenae-e
HlCHMAM.k R Operating Reactors Assessment Branch DO/O7/H
VARCAiS A Operating Reactors Branch 1 7pp 03056 2fcg ^4*
Fich* 3O-247, BO/07/lfl, 8007310117
0CGB05022Q Request! LB Mar ah be permitted to continue reviewing
overpressure protection ys J. associated Tech Specs
NCViAK.T Assistant Director for Operating Reactors QO/0'/ iO
ERhSTiM L Assistant Director for Technology Review j [>
03079 175 24* Fiche SO-S47, QO/O7/30. S000OS0220
B00813074fl Suffmaru of 900617 meeting u/utils in Dethesda.MD i-
conlainment structural response to core mo 1 1 accident
sequenc e;
hEVER.J F Power Systems Branch 90/07/31 Power Quitimi
3pp 03246 2'13 24X Fiche 50-247,00/07/31.0000130711
insp of hijdraul it
icessiv*
S009100IO'l Approves Tech Specs revision proposal r
tluid o f snubbers supplied by common reservoir &
Fluid lots due to eiternal tubing leakage
BARRETT. LH Operating Reactors Assessment Dranch (10/00/05
VAUGA. S A Operating Reactors Branch I (Pro B0043Q) In
03SI& Ofl 24X fiche 50-5.17, BO/OB/05, QOO91 00101
6008310627 Forwards request For addl info re spent fuel pool rrrailir
Info needed to complete review of uti I application for
license amend
fiUBENSTEIN, L. S Assistant Director for Care t, ConUlnmoiH <>|ivtA>
BO/OB/OQ NOVAK.T H Assistant Director for Opeiating Hp,i L tuii
3pp 0339? 306 24X Fiche SO 247, 00/03/00.
6.2 10 350272 Requests substitution of SL Qaum u/TH Fray on official eve
list for proceeding -Related correspondence
COLARULLI.P F Morgan Associates CDLAfiULLI, P F Power Authority
of the State oF flau rork &3/10/I9 STUCKV.B H Docketing S,
Servicei Branch Ip 15791 190 E4X Fithe 50-247,33/10/19,
3310230273
Forwards recomnnnilations on staff tasfc action pln \
sent to licensees For revicu { response
DAR-RETT.LH Operating Reactor! Assessment Branch CiO/QU/OSI
VAROA. S A Operating Reactors Dranch I (Pre 000-120) flop
0351i OA6 2flX Fiche 30-247.80/00/09,8009100100
Advisori; Conmitte* on Reactor 5>afguards re-ports t. c orrespondenci
82071B0077 Foruarils comments on PRA Itudy dealing u/selsmlc halai-d
Valldit<| of c ont lus tons rest on quality of primary data
tjaii ti asiuiript Ions in both itudiei Reptt ape not valid risk
asieiimenti duo to data bale limitations
POHEROV, P H Rondout Alsoclatvi PDMEI10V, P H ACRB - Advisory
Committee on Re-actor Saf*auard* 33/00/24 OKRENT, D ACWB -
Arfvdory Cnnnnlttee on fleactor SafejuariJa 7pp 13976 001 34X
Fiche 50-003, 62/06/34. B2071BQ077
B009030334 Formards Reactor Fuel Section questions re LOPftfl f,io 1
core prevmualij containing HIPAf? fuel Questions shouli] lit
roruarded to I icertseo
flUBEN6T,EIN, L S Assistant Oireclor for Core >, Canlall^ftn )'V>1
QO/09/1B NOVAK.TM Assistant Director for Operating flidClo
3pp 03463 O33 24K Fiche 50-247, QO/OS/ 10. 8009030^4
SOO'?uB04i,6 Forward! response to BOOB20 rD<(uest for stjilut rtpt I
Iion/Itufian Point task action plan Re sponi i h i 1 1 tl as *r In
area of severe accident mitigation FeaturHs fc not in interim
operational actions portion
MEYtR.J F Reactor Systems Branch 00/08/25 NOVAK, T M ^i
Director for Operating Reactors 2pp O3404 009 VAX
TLchB 30-003. ao/00/25, BOO-?OBn4A(,
DOCKETED ITEMS
39
tt 0240644 Forwards safety evaluation
for
electrical override of manual
ntainment ventilation Isolation V
ion Feature:
o> li jr ESF sys
QLSHIUSKI.J A Operating Reactors Assessment Uranch SO/lO/06
VASOA, B A Operating Reactors Branch I 3pp 03661 092 24X
Flthe 50-247, BO/ lO/Gd>, 8O1Q240644
8210O10401 Forwards application to amend Licenses DPR-26 !< DPR-5,
changing Tech Specs re facility organuation & Unit 2
Tech Specs 3 6 & 4 4 re containment isolation valves 3 12 t
4 12 in pipe lines Class I, II t< III fees sue]
O'TOGLE.J D Consolidated Edison Co of Neu York 83/OB/3I
VARGA.S A Operating Reactors Branch I 3pp 15572 211 24X
Fiche 50-003.03/08/31,3210010401
G'flO7Q3l2 Advises that FranHin Research Ctr uas notified to proceed
j/ final evaluation of fracture toughness of steam generator
' reactor coolant pump supports Due to util BOOB2B request
tor dp Idij, app ropr i ate conservative assumptions mill be made
OLSHtNSIU J A Operating Reactors Assessment Branch NRC-03-79-I IB
QG/lO/Qd VrtROA.S A Operating Reactors Branch 1 2pp
03t&l 209 24X Fiche 50-217. BO/ 1O/O6. BOIO270313
pn i i I IG034 Requests Instrumentation % Control Sys Branch evaluation of
end Licenses DPR-26 tt DPR-5. revis inp. TB
e facility organ! la t ion for
u I i 1 respnn-,05 to question
dt faci I i ties Info will aid b
te-.at.ures re backfltting oh se
1PE1S. T P Ruactor Systems Ii
Instru^entaliun i Control Stjs
50-217 QO/IO/0? B0111100Q4
incore ins tr umen ta t ion tubes
inch evaluation mitigation
;re mitigation Features
inch 80/10/09 SATTERFIELD, R
;ms Branch Ip O2227 001 24X
Foruarils NRC questions '. u> i I answers re hackfltting of
severe accident mitigation features Evaluation needed In two
Ul 5
SPEIS. T P Reactor Systems Branch
'-rut tural Engineering Branch Ip
Fiche S0-?i17, BO/10/17, BOIO2BOO9B
BO/10/17
65767 184
SCHAUER, F P
24X
'IQM200025 Forwards Pomar Sys Branch evaluation of difference!
Indian Point 2 t, 3. in response to technical assistance
i e quest Requests meeting u/licensee prior to formal responsi
'o evaluation
tHEC^ P S Assistant Director for Plant Systems BO/IQ/31
fOVAI'.T Assistant Director for Operating Reactors 21pp
03743 111 24X Fiche SO-2'17, BO/ IO/21 , 801 1200025
']OL 1210204 Forwards draft safety evaluation of licensee response to
lasV Action Plan Hen II E 1 2 Automatic initiation logic,
i its tru--entat i on & associated circuitry ', automatic feedualer
i 1 ou indication channels meel safety-grade requirements
, K Instrumentation ft Control Systems Branch 00/10/32
. E Operating Reactors Branch I Bpp 03744 123 34X
D che SO- 247. 00/10/22,901 12LO284
f)1OlO5052EI Forwards questionnaire to be completed by each neai term 1)1.
' each liceised plant by B01107 Objective 15 to assess best
collective judgment re eitent of problems recently
eipersenced at facility
UlRDANiE L Office of Inspection ', Enforcement, Office of the
ftiraetoi 80/10/28 BRUNNER, E J Region I. Philadelphia, Reactor
Operations Nuclear Support Branch LEWIS.R C llegion 2. Atlanta.
Pip-actor Qperations Nuclear Guppoit Branch HEISHHAN.R F Region 3,
Thicagar Reactor Operations tluclear Support Branch 2pp 943B1 JBii
2.1* Fiche SO-24/.aO/10/2Q,B101050520
1O11O70227 Requests all operating reactor project managers to conduct
telephone survey u/1 icensees to determine If plants are
susceptible to svc water leaks Results of survey requested
bv 001031
IJLSHAII, L H Operating Reactors Branch 1 00/10/29 Operating
H*actors Branch 1 Ip 03715 124 2-)X Ftche 50-347,80/10/29.
DO I IO70227
Bill 1120679 Forwards response to request for determination of licensing
basis for reactor pressure vessel & containment fan coaler
jifs re FSAR requirements & current NRC criteria Licensee
must perform thermal & stress analysis of vessel
LAINAS.G C Assistant Director for Safety Assessment GO/10/39
EISGNHUT, D Division of Licensing 6pp 03719 357 34X
Tic he &O-247. BO/ 10/29,601 112O679
G011100165 Submits revision of relative concentration for thorb-term
releaie following an accident Facilities aicluiion radius
found to be Sao meters resulting in relative concentration
equal to 00091 sec/cu meter In louthusst direction
HOUSTON i R U Accident Evaluation Branch 80/10/30 VAROA, S A
Operating Reactors Branch I Ip 6576B 03 1 34X
Ficho 50-347,00/10/30,0011100163
9207050095 FOIA request far eight categories of record! re staam
generators tt staam turbines
LONG. D J Winthrop, Stlmson, Putnam b Roberts 82/07/13 Office
of Administration 3pp 15645 060 24X Fiche 50-247,02/07/13,
6207050085
&21 0070007 Responds to FOIA request for eight categories of records re
steam generators & steam turbines App A documents provided
in R Utfell FOIA Request 31-313 Foruiard* documents listed In
App B
FELTON, J M Division of Rules and Records 82/09/10 LQNQi D J
Uinthroa, Stlmson, Putnam t< Roberts 9pp 15645 O63 24X
Fiche 50-000,92/08/10,9210070007
-B210010409 Application to
Spec Figures 3 3 & 6 2-2
Units I 1, 5, respectively
O'TOOLE, J D Consolidated Edison Co of New York
15572 214 34X Fiche 50-003. B2/OB/31, B2I00104Q1
8210010414 Proposed revisions to Tech Spec Figures 3 2 & 6 2-2,
reflecting change In organizational structure to include
position of operations superintendent Safety assessment
enc 1
* Consolidated Edison Co of New York 92/OB/31 6pp
15S72 216 24X Fiche 50-OO3. 02/OB/31 , 821 0010401
8310010425 Application to amend License DPR-26, revising Tech Specs
3 A It 4 4 to establish requirements for action required uihen
containment isolation valves are inoperable & reflect
changes to isolation valve provisions
0'TOOLE,J D Consolidated Edison Co of New York B2/OB/31 2pp
15572 222 24X Fiche 50-O03, 82/08/31, B2 100104O1
--8210010439 Proposed revisions to Tech Specs 3 6 & 4 4, establ 1 sh ing
specific requirements for action during i noperab i 1 i ty of
containment isolation valves & reflecting changes d add it on a
to isolation valve provisions Safety assessment encl
* Consolidated Edison Co of Neu York 82/00/31 20pp
13572 234 24X Fiche 30-003,82/08/31,0210010401
8310010443 Application to amend License DPR-26. revising Tech Spec
Sections 3 12 & 4 12 to defflect editorial change
safety-related pipe lines it to efflcct editorial change
O'TOOUe.J D Consolidated Edison Co of New Yorfc 82/08/31 2pp
15573 244 24X Fiche 50-003.82/08/31,0210010401
0210010449 Proposed revisions to Tech Spec Sections 3 12 !< 4 13,
reflecting redesigned support sys for saf ety-related pipe
lines tr to effect editorial change Safety assetsment encl
* Consolidated Edison Co of Neu Yorl 93/08/31 IBpp
15572 24& 34X Fiche 50-003,82/08/31,0210010401
62100S0049 Notification of 620929-30 meeting m/util t, Franklin Research
Ctr in Buchanan, NY to discuss contractor review of util
radiological effluent Tech Specs
THOMA..J Operating Reactors Branch 1 B2/09/23 VARQA. S A
Operating Reactors Branch 1 2pp 66367 356 24 X
Fiche 50-247,82/09/23,8210080049
3210130603 Informs that revieu of 010731 response to Generic Ltr Bl-01,
"Qualifications for Insp.Eiam t Testing (< Audit Personnel,"
complete Commitments b eiceptlons to Revision I to Reg Quids
i SB tt Reg Quids 1 146 acceptable
VAROA, S A Operating Reactors Branch 1 B2/09/27 O'TOOLE, J D
Consolidated Edison Co of Neu York 2pp 15692 347 24X
Fiche 50-217,92/09/27,9210130603
6210130435 Foruards responses to Items 1,3, 4 ti 3 of NRC 820319 request
for addl info re control of heavy loads (NUREfi-0613) Info
addressing Items 2, 5, 6 & 7 mill be submitted by 030131
O'TOOLEiJ D Consolidated Edison Co of New York 93/09/30
VAROA, S A Oparating Reactors Branch 1 7pp 15682 019 24X
Fiche 50-347,82/09/30,9310130455
Q2101Z0353 Foruardl Initial comment! on Sandia Natl Labs 930925
prelimnary draft 1 tr rapt on revieu * evaluation of
probabilistic safety study, addressing wind, seismic, fin.
preiiurlied tntrmal shock & tan coulrr issues
O'TOQLEiJ D Consolidated Edison Co of Neu York BAYNE. J P Power
Authority of the State of Neu York B2/10/0& VAROA, S A Operating
Reacton Branch 1 63op 15652 215 24X Ficha 50-247,82/10/06,
B2101202S3
6210190693 Advises that results of 830920 *ve miter ays test prove that
Indian Point probabilistic safety study reflect actual
plant configuration Remaining plant Improvements In 920305
Itr.eicept ATWS mad, to 6e complete by return to svi
Q'TdOLE.J D Consolidated Edison Co of Neu York 92/10/08
VAROArB A Operatinj Reactors Branch 1 Spp 15739 141 24X
Fiihe 50-247, 8S/10/OB, B21O190693
6210310032 Foruards request for addl info to complete revieu of TMt
tttm II K 3 25, "Poutr to Pump Seats " Area* of conforming
or deviation from stated position should be Identified ic
info i-t design & operation of cooling sys provided
VAROA, S A Operating Reactors Branch 1 B2/10/15 O'TOOLE, J D
Consolidated Edison Co of New York 3pp 15774 360 24X
Fiche 50-247,92/10/15,8210210033
38
DOCKETED ITEMS
821Q2E0242 Requests Commission is-sue order directing all meetings
ietuieen tJRC f, licensee be held in HasB ington, DC or NY, that
intervenar* receive notice op meetings cone urrentlij u/utils
t that intervenors he provided w/mlnutei of 621013 maetino
WEISS. E it Harmon fc We ill WE I S3. E R Union of Concerned
Scientists aB/10/25 PALLA01 NCJ.N J . AKEARNE. J , SILINBKY. V
Goir.TiisHoiiBrs 2pp 15837 OSS 34X Mche 50-347,33/10/23.
8210230342
B21O2BOS30 Advises that MRC duel not intend to respond to intervenor
motions filed In reijionse to ASLD 631001 order until after
B21 103-04 nra hearing tonfersn.ee
MOORE. J E H.arino Branch 1 S3/10/27 QLEASDN, J P . SUCH, F J .
PAtllS.O H Atomic Safety and Licencing Board Panel lp 13H37 Oaa
24X Fiche 50-347,82/10/37.6310280230
8210290353 Rusp am* opposing UC8/I1V P1RO 021013 motion to direct NHC to
reschedule all future meetings on hearing issues in NY or
Washington. DC NIC should he permitted fleiihllity to-
cjeterriina most appropriate location H/Certi f i Cate of Svc
MCCURftEN.H J Hi 31- ing Branch I 92/10/27 Cominl is loners 9pp
15637 019 24X Ficne 50-247,92/10/37,8210280353
8aiOE90271 Advises that licensees plan to address alt matters raised in
responses/motions TI ASUS 821OOS memorandum t orfler at
E2UO3-G4 preheat-ing conference
BRANDENBURG, D Consolidated Edison Co of New Yorl MORGAN, C
Pojer Authority of the State of tltia York MCRGAN, C Horoan
A&jocntes 83/10/27 CLEASON.J P , SHOW, F -J , PAIJI5,O K Atomic
Safaty and Licencing Board Panel 2pp 13353013 24 X
Fiche 50-247, 02/10/37.0210290271
H General e orreiponqlBnci
6007310117 Forwards rsqueit for add! info required to cocnnletB rr,iiiUii
Hesearch Ctr evaluation of' adequacy of steam generator t,
reactor coolant pump supports Request should be sent to
I icensee
WICHWW.tt R Operating Reactors Assessment Branch 3Q/O7/14
VARGA, S A Operating Realtors Branch 1 7pp O3056 2fcQ $.%
Fiche 50-347. 60/07/11, 3007310117
3008050230 Bequest) LB Marsh be permitted ID continue r
overpressure protection sijs !> associated Tech Specs
NOVAK. T Assistant Director for Operating Reactors
ERfJST.HL Assistant Director for Technology Review
QDO/B 175 24X Fiche 30-3.17, BO/0//3O, 8009030230
Bo/Q//'i<;
[|>
9009130744 Summary of BOOM? meeting ui/uUls in Qethesua. MO r*
containment structural response to core melt accident
Sequences
I1EYER.J F Power Systems Dranch BO/07/31 Power (auiiim
3pp 0326(> 243 34X Fiche 50-247- 60/O7/3 I, 000013074^
insp of hijil ran I
6009100104 Approvo Tech Specs revision proposal r
tluid of snubb*ra supplied bg common reservoii 1 li
fluid lose tfue to eiternal tubing leahaoe
BARRETT, LH Operating Reactors AssesBmant Branch
VAHOrt.S A Operating Reactors Branch 1 iPre 500'12[i1 lp.
03S16 071 24X Fiche 50-347, BO/Oa/05. B009IOO1O4
BQOB210627 Forwards request For addl info IB spent fuel potil >r*>Ur,
InFo needed to complete review of util application for
I icense amend
RUBENSTEIN.C S Assistant Director for Core J- Conlnlnme'il 'juilrai
80/08/08 NQVrtK, T M Assistant Director f 01 Qpei alinj fi,M L,,, *
3pp 03383 30A 34X Fichu 50-247,80/00/09,1
321025-0572 Requests substitution of SL Baum u/TR Fray on official avt
lut for praceadlng Related correspondence
COLARULLI.P F Morgan Associates CDLARULH.P F Power Authority
of the State of Neu Vark 83/10/19 STUCKY, S W Docketing t,
Services Branch lp 15771 190 34X Fiche 50-247,03/10/19,
3310390273
Q Advisory Conmsttee on Reactor Safeguards report 3 & correspondence
&2O71&Q077 Foruards comments on PftA study dealing ui/seismic hazard
Validity of conclusions rest on quality of primary data
bases & assumption) in both studies Rtpti are not valid rllk
assasEments due to data bate limitations
POKEROV, P M Rondout ftslotlats* POMERDV, P U ACRB - Advisortf
Commibtea on Reactor Safeguard! 83/09/21 OKRENT, D ACRS -
Advisorij Committee on Reactor Safeguards 7pp 13B7i 00 i 24X
Ficho 50-003,62/08/31,0207150077
P Dperatins license stage documents t correspondence
8009100100 Forwards recommendations on staff task action plan t n ti
sent to licensees For reviiiui >, response
BARRETT. L H Operating Reactors Assessment Dranch KO/Oii/flll
VARQA, 8 A Operating Reactors Branch 1 (Pre 00042111 lip n
03916 Oi6 24X Fiche 50-247, BO/00/OEt, E100 1 ?! OOlOO
BOOS030334 Forwarfls Reactor Fuel Bectlan quoationa re tlll'ftH tnl i-
care previously containing HI PA!) Fuel Questions ghoul it [is
foruarded to liEenseo
RUBENSTE1N.L S Assistant Director fur Core S- roiitflli.mBiil hji(,j
80/03/18 NQVAK.T H Assistant Director for OnerjUinn U,iiH-nri
3pp O34&3 022 24X Fichs 50-247, QO/OQ/1B, 00070301 VI
6009080466 Forwards response tQ BOOQ20 request for slJilui rt"pl <r
Zion/lndian Point task action plan Responsibilities Are in
are* of severe accident mitigation features d not In liuai In
operational actions portion
MEVtiR.J f Reactor Systems Branch BO/OB/35 NEIVAK. T H ftio]
Director Por Operating Reactors 2pp 03404 007 J4x
Tiche EO-003, 80/OS/29, 600^000466
8006240951 Diseysus postulated ful handling accident inililt
tontainmenti bated on llonm 77061S accident analysis
Analysis includis uiont ilngl* failure during accidant
Safety evaluation & containment purge iija Tech Specs end
DAfiREtTiL Operatins Reattors Assessment Hranch BO/Ofi/Q6
VAROA.S OpBratlng Bo-actor* Dranch 1 3pp 02767 167 34
Fiche 50-247. 80/06/06, 6006P40B51
8010150103 Discusses union representat i va allogation r li*r a
security guard oDT-sonnal Add] info necessary prior to Nll{
investigation of alUgotlons
WARIl.W J Office oF Inapection fc CnforcBmont, OfPlc nt l
Dlrnctar 80/09/29 Officn of Inspection b izitfoi ctmtttt,
the Director app 03630 36E) 24X Tuha 30-347, 00/01) ijft,
BOI0150I03
9007010658 Operating ftsactor Ev.nt Memo BO-7 re nearlu aUultaneoui
trip* of Units S fi 3 Event uat of negligible safety
significance & trips unre unreloteil t coincidental
EISEMHUT.D Divi*ion of Llnniino 60/06/13 VQI.LHER.R H
Division of Enginring MATTSQNi R J Division of Safety
Tethnologu HAN*AUER.6 H Division of Human Factors Safety Snp
02BI5 14,5 2-1X Flch 50-2il7iSO/06/13,B00701063B
BO 09250 2 31 Buhmiti dascriptlon of uorV being dona on *.ni)yiii at
releases from Facilities Bimpl* l-D mul ticampartminl U T r*i
hydraulic code being written to analyie variety of I VIJI)
designs Related data one I
FENSTERMA.CHER Ractor Systams Branch BO/09/JO ttPLlli. t r
Reactor Systems Dranch 4pp O3589 297 SIX Hr* W) inf no.
6007250234
6007O7044B OoiraSino Htactor Evint Hirno BO-B re lo*i of offsite pouer
Efftcts at thunderstorm resulted in total Ion of offiltl
DOUJBT Etiirgencij dl*nl generator* functioned properly
EISENHUT.D Division of Mctnsing BO/06/13. VOLLMER.R H
Division of Englnvering ROS3.D-F Division of Systems Inteoration
(pr BllQQSI HAHAVER.S S Dtviilon of Humtn Factors Safety Bpp
02BS1 319, 2 Ficha 30-247, 60/OA/ 13, B0070704.4B
B010B20234 fin pond i to Q00717 rquet r control room rsvt lu iwc
Itr d*tJellrf tivt addl itemt to noar-term OL rnqiijr*nl
Itam III 3 4 rpqulrns analysis of control room
habltahtlUu- ty BI0101
HOUBTOM, R H Accldenk Evaluation Branch BO/0/23 VAflO* s *
Opratins Raactori Branch 1 lp 03360 001 S'X
Flch* 50-247r 90/09/25. B010S20334
B007150303 Notifies that review will b> cunductid cf Qffshor* Pouar
fihort-tirm rlsfc ituJ usfng various r*iources, in rt*poni>
to SOOfiOS requtlt Eva luatjon ui 1 1 be submitted 1 by 800922
MATrsQN, R J D-ivisUn of Saftty Technology. BO/07/02
ersenHur, a o D V (ion of Lic*nting Spp oa^sa 301
F(ehi 50-a
90a72B0312 Sum
*ccidentt on
CODELL.R Hy
' Hl|d
ij < aOOt2B mtttin) u/util rt Imp.litat ions of Clais 9
quid pathuau* at P*cilitij,
itleait t, 4<itechnfcal Engine erlng Branch flO/07/OB
D i lc fc 80t ":l""=l Engin..riT>j Brancd 9p<i.
rich, so-sw, '
B0103107B3 Foruardi rvcaaimindatic.nl for mentino auiJ|)
<nin flow rtqulreminti Licen**i must dBontrt tf'e^V
removal Por 10 minute i u/o optrator action or ret contro
valvi throttled position
CHECK.P S Atiiitant Director for Plant System*
Nt7WK.rM Assistant Director for Optrating Reactart
03647 104 24X Ftch 90-247, SO/09/aB, BOI03107B3
6010240329 Dlicuiits human factor* control room dJgn in
on 800219-22 <, 900310-11 Cornetlv. action* prot.dur..
ImpHmantation ithadijle provided. Con Ed ti PA8NV control
daslgn rpti found incomplete
MODREiV.A Divtiion of Human Factors Bafitij-
OCSHINSKIiJ Division oi Lltnins 3pp 036S9
Fichf SO"Sfl7. 80X09/29, 8010340339.
fl,^f v tl^
DOCKETED ITEMS
39
in 10 2406 44 Forwards safety evaluation re electrical override of manual
actuation features for containment ventilation isolation t
n'her ESF s ij *
ULHINSK[.J A Operating Reactors Assessment firanch BO/10/06
W,3GA S A Operating Reactors Branch 1 3pp 03661 093 34X
Fithe 5O-247, 80/10/0-6. B0102'IO(.44
B2100104O1 Forwards application to amend Licenses DPR -26 t DPR -5.
changing Tech Specs re facility orflan i lation & Unit 2
Tech Specs 3 & t, 4 4 re containment isolation valve* 3 1 2 &
4 12 in pipe lines Class I.I! d III fees encl
P'TOCILE.J D Consolidated Edison Co at He ui York 35/03/31
vARGA,S A Operating Reactors Branch 1 3op 15572 211 24X
Flche 50-003,02/03/31,8210010401
3i~i|02703l2 Advises that franHin Research Ctr iuas notified to proceed
i_' final evaluation of Fracture toughness of stnam generator
' reactor coolant punp supports Due to util BOOB2B request
lor delay , <ap p ropriats conservative assumptions null be made
OLSHfMSC 1, J A Operoiing Reactors Assessment Branch NRC-03-79-1 IB
B-0/1O/CK. VAROA, S A Operating Reactors Branch ! 2pp
O34&1 209 24X Flche 50-247,00/10/06,6010270313
sOllllCOai Bequests Iris ti umentat i on f, Control Sys Drafich evaluation of
Ljlil responses to questions IB intore instrumentation tubes
at facilities Info mill aid branch evaluation mitigation
lectures re b^ckfitting of severe mitigation features
SPEIS 1 P Ruactor Systems Branch 80/10/09 SArTERFIELD, Fl
?n tat 1 un !. Cc
)1 Systems Branch
Pith? 5O-217, 0O /1 0/07, BGl 1110084
IP
02227 001 34X
Forwards NRC questions * uti 1 answers re backfittlng nf
ccident mitiijation features evaluation needed in two
SfEIS, T P Reactor Systems Branch
S'ructural Engineering Branch lp
Fiche 50-247, 00/ IO/ I 7, 801 02E009S
60/10/17 BCHAUED.F P
65767 104 34X
90L1S003S5 Forwards Power Sys Branch evaluation of differences between
Indian Point S It 3, i n response to technical assistance
lequest Hefltieits meeting u/licensee prior to Formal response
CHECH, P E Assistant Directoi for Plant Systems BO/10/31
hC*.AC,T Asa (.slant director for Operating Reactors Hipp
G3743 111 24X ClLhe 50-247, BO/10/21 , 801 1200025
IQllSlQ-SB'l Forwarils draft safety evaluation of licensee response to
lask Action Plan Itan II E I 2 Automatic initiation logic,
I us tr ur-c'n ta f i on >t associated circuitry I, automatic feeduater
rlotu indication channels meet safety-grade requirements
SATTERFJE1D, H Instrumentation b Control Systems Branch BO/10/22
VARGfl.S Opeiating Reactors Branch 1 Bpp 03714 123 24X
Pictio 50-347. 00/10/22, B01 1310201
I1O1O5052B Fcruards questionnaire to be completed by each near-term UL
t- each licensed plant by 801107 Objective is to assess best
collective judgment re eitcnt o t problems recently
eipcr i em ed at facility
JORDAN. E L Office of Inspection t Enforcement. Office of the
Director SO/1O/20 BFiUNNER, E J Region 1, Philadelphia, Reactnr
Operations Nuclear Support Branch LEWIS, n C Region 2, Atlanta,
React Jr Operations Nuclear Support Branch HEIBKMAN.fi F Region 3,
Chicago. Reactor Operations Nuclear Support Branch 2pp "745B1 1H6
24X Fiche 50-2'17, BO/IO/2B. B101050S28
OIIO70527 Reque-sti all operating reactor project managers to conduct
telephone turveu. u/1 icensees to determine if plants are
susceptible to ivc uater teals Results of survey requested
bit Q01031
OLBHAIJ, L H Operating Reactors Branch 1 BO/IO/B9 Operating
fieaclors liranch I Ip 03715 124 24X Flche 50-247,90/10/39,
0011070327
Foruiards response to request for determination of licensing
basil for reactor pressure vesael fc containment fan cooler
si/s re FSAR r enulrements t current NRC cnturla Licensee
must perform thermal t> strest analysis of vessel
LAINAS, C C Assistant Birector for Safety Assessment BO/10/29
FISEWHUT, D O Division nf Licensing 6pp 0371? 337 24X
Fiche 50-247. flO/IO/29, SOI 1130679
011100165 Submits revision of relative concentration for short-term
releaie fnllouinj an accident Facilities exclusion radius
tound to be S2O meters resulting In relative concentration
eq.ua] to OOO31 sec/cu meter tn jouthuest direction
HOUSTCM. ft U Accident Evaluation Branch 80/10/30 VAROA, S ft
Operating Reactors Branch 1 ip 6576B 021 24X
Flchn 50-247,60/10/30,0011100163
207050095 FOIA rxtuest for eight categories of record* re steam
gBtiHrators b s taam turbines
LOMO. D J WlTithrop, Stimson, Putnam t> Roberts B2/07/13 Office
of Adminntration 3pp 15643 OfiO 24X Flche 30-347,02/07/13,
82O70300S5
621001O409 Application to amend Licenses DPH-26 fr DPR-5, r evi s ing Te
Spec Figures 3 2 S- 6 3-2 re facility organization for
Units 1 & 2, respectively
O'TODLE, J D Consolidated Edison Co of New York 62/09/31 2n
15372 314 21X Fichfl 50-003, B2/OB/31, 82 I 0010401
B21001O414 Proposed revisions to Tech Spec Figures 32*6 2-2,
reflecting change in organisational structure bo include 1
position of operations superintendent Safety asseisment
encl
Cc-nBoliifateK Edison Co of Now Vori S2/OB/31 fipp
15572 2!6 24X Ffche 50-003, B3/OB/3I , B3 I 0010401
02I001O425 Application to amend License DPR -26, revi 5 ing Tech Specs
3 6 Si 4 A to establish requirements for action required when
containment isolation valves are inoperable t reflect
changes to isolation valve provisions
O'TODLE.J consolidated Edison Co of Neu York B2/OH/31 2p
15572 222 21X Fichs 50-003, B2/OB/31, B2 I 0010101
321001O43B Proposed revisions to Tech Specs 3 6 ti 4 4, establ 1 ahing
specific requirements for action during t noperabi 1 i tij of
containment isolation valves & reflecting changes & add it an a
to isolation valve provisions Safety assessment end
* Consolidated Edison Co of Neui York 82/08/31 20pp
13573 224 24X Fiche 30-003, BH/OB/31, 9210010401
3210010443 Application to amend License DPR-36, rirvislnfl Tech Spec
Sections 3 la & 4 12 to def fleet editorial change
safety-related pipe lines b to efflect editorial change
O'TQOLE.J D Consolidated Edison Co of Meu Yor* 02/08/3 1 S(
15572 244 2fl* Fiche 50-003, 82/OB/3I. BB 10010401
3210010449 Proposed revisions to Tech Spec Sections 3 IS & 4 13,
reflecting redesigned support sya for safety-related pipe
lines t- to effect editorial change Safety assessment en-El
Consolidated Etfiaon Co of New Yorl S2/OB/G1 IBpf
15573 246 34X Fiche 50-003,82/00/31,9210010401
B2100B0049 Notification of B209S9-30 meeting Lr/util t, Franklin Ruaoar
Ctr in Buchanan. NY to discuss contractor review of util
radiological effluent Tech Specs
THOMfW D Operating Reactors Branch 1 82/07/33 VAROA, S A
Operating Reactor! Branch 1 Spp 64367 336 24X
flche 50-247j 92/09/23, SaiOOB0049
8210130603 Informs that revieu of 010731 response to Generic Ltr Ql-<
"Dual if ications for Insp, Eiam * Testing tc Audit Peror.nel, "
complete Commitments ti eiceptions to Fie vis ion 1 to Reg Quid's
1 53 It Reg Guide 1 146 acceptable
WROA.8 A Operating Reactors Branch I 82/09/37 O'TOOLE, J D
Consolidated Edison Co of Neu York 2pp 15692 947 24 K
Fiche 50-247.82/09/37,9210130602
6210130433 Forward! responses to Items 1,3,4 & B of NRC 820313 runnel
for addl Info re control of heavy loads (NUREO-0612) InPp
addressing Itemg 2,5,6 & 7 ul 1 1 be submitted by 930131
O'TODLGiJ D Consolidated Edison Co of NBU York B3/09/30
IMRGA'S A Dptrating Reactor* Branch 1 7pp lfl6B2 019 24X
Fiche 30-247,83/09/30.6210130453
S210120S53 Forward* initial comment* on Sand is Natl Lib* BSOB23
prelininary drift Itr rept on revieu *< evaluation of
probabilistic safety study, addressing ulnd.aeiimlc.flr*.
presiurlied therm*! shock d fan coaler issues
O'TOQLE.J D Consolidated Edison Co of New York BAYWEj J. P Poi
Authority of the State of Neu York B2/10/Q6 VAROA. S A. Opurat
Reactors Branch 1 6Spp, 13652 215 S4X Fiche SO-B47, Ba/lO/Ot,
8310I20S53
S210I90i93 Advises that results of BB0920 svc uiater fut bait prov* t
Indian Point probabilistic safety *tudy reflect actual
plant configuration Remaining plant Improvements In 620303
ltr,e>c*pt ATWB mod' to be complete ty return to svc
O'TOQLE.J D Consolidated Edison Co of NitJ York S2/10/OB
WROAiS A Operating Reactors H ranch 1 Spp 1S73B 141. 24X
Kiche 30-247. 82/10/03. 8210190693
310070007 Responds to FOIA request for eight categories of records re
steam generators l< steam turbines App A documents provided
in R Udell FQIA Request 81-313 Forwards document* listed in
App D
PEL TON, J M Division of Rules and Records 83/09/10 LOMO, D J
Hint hi- op, gttmton. Putnam (< Roberts <?pp 15645 063 24X
Fiche 50-OOO, B2/OB/10, 8210070007
SI0310032 Foruardii request for addl info to complete revinu of TMI
Item II K 3,25, "Power to Pump Be* It " Area* of confornanc*
or deviation from stated position should bo identified k
info re design Si operation of cooling lyi provided
VAROA.S A Operating Reactors Branch 1 32/10/13 D'TOOLE, J D
Consolidated Edison Co of Neu York 3pp 13774 360 24 X
Fiche 90-247.82/10/13,8210210032
DOCKETED ITEMS
B.210280-12F] Forwards lafaty evaluation of ddoquaK-j of station electric
distribution aijs voltages based on utll G3070 1 ? ] tr Sys
voltages adequate flaviaui closed
VftRQA, S A Operating fiedctors Branch 1 33/10710 O'TOOLE.J B
Consolidated Edllon Cn of NBU Vorlt Spp ISftfaO Ql<7 24X
FLclic Sfl ?47, H2/10/ 1(3,02 I 0-?BQ42(1
taUr, to
- -l33]C2iJCl'130 Ha Petij evaluation supc-ortlng adenuanj of
d 1 strtbwt I n n IMS voltages
-" Office of Nuclear ilflactoi Flojula 1 1 on, Director
cat BOX i-icim 10-247. n;vio/in,a?iQ3B042<i
station electric
Q2/1Q/IB 7pn
0210200133 "ftdenuaCLj f Station Electric Distribution tys, Woltanati.
Indian Point Nuclear Station, Unit 2 "
UOV. rt C i l/CUFfl, 1) A KOliO, Inc FIN A-64J9 00-EA-S307 Jld]
&3,-07/30 PEVATTE,R L Division of Systems Integration (post
anoosi I4pp isacso o.>a 31* Fteho 5o-5fl7.o?/io/ia.saioaaoi2H
E},2 I tJawraOB Mot i Pi os of ctnni-ge& in estimated schedule of completion
IMI Items II f I, "Mob lo Cos Monitoring." II D n, "Post-
Accident S.nnrling." 't III D '1 -I- "Coniro) liontn
"
Mods will bff canplctjd by end of refueling
Consolidated Eaison Co of Maul York SSflO/lt
poiating Reactors Drnnch 1 2pp 19tK)2 3'j7 3<1X
Habitat) i 1 Ity
tl"100LE,J n
WRGA, 3 A
Inspection reports. IF II ill lot i !"> d
tlBiOQEQlHO Addl response to rtllrt request fni I 1 ? categories of Info r
nucloivi reactor events t safety problems Forwards documents
listed in App A Doc limn nt a In App n i amp lolo 1 <j withheld (ref
FO1A Eionpt ion &1
FEI.TPM. Jll Division of Rules and Ilotords (92/07/12 UDELL, R A
Critical Kaaa Enn-rgy Project <?pp 1 Sf C.3 027 24X
richo so-oon, na/Of 1 / in,
E.21000QI37 Fiij staiwot 1 c a-aoi iinunfc of licetisos per f ornatics notes re
facility avjlufltion Fur 1?BO
HFIC - Mo Detailed Affiliation Gl ^on QO/12/31 7pp
19ftft7 350 HflX Piths &0 -000< B2/O//13.liaiOO[]OOI3
0310070007 noopard3 to FCIIA reqjuelt for elghl Cdtegarles of records
steam gonorators t itonra tui-hlnos App A ilocumenti provided
In il Udfftl miA f)eq,uBot l-,n^ Porwardi documtnts lifted In
ftpp D
FBI. TON, J M Dlviaian uf HiiUv anil Flecnrda BJ/OR/ 1O LOMO, D J
Hlnthroii, JUinann. Putnam T- Itoborts ^pn 1 3M5 Oil S^IX
richa 50-000,
EiSl0070ia 1 ? Forward* tabulated tlatii on it^am atnsrator Inep (c mnlnt al
facllitle Data ihoultf bo pru-vidod to L I EJ iis-oas
IPPQLITH', r Doofatino lleactoi-B ftititssnient Branch B2/04/OI
VARQA.S Dpsr-itlng lleactnra Branch 1 Spn 1S643 131 ?1X
(5SI007O173 Forwards info r* *tnara ginerator Integrity & imps at all
operating P lilts, par f5Q3PQ 1. SI irequDitB nctalli of inipt,
including defect indlca t i om. tube plugging criteria t, tubes
plugged will not be provUod nicept tor Point Iiach 1
GOLLER.K n Divliton of Heactor Licning INFin-1979 onlyl
yS/OSi'Bfl (IftCC/inr.R R Dlulnion of Technical navieu (MflR-1775
onlij) 3pf 15MB 19A 31X ricdo 50-000, S2/OB/IO, B310070'0t>7
8ai020007E3 Foruiarili itaam aonoratcr anon proaram fur 19D2 refueling^
maint outage
Q'TOCLE.J D CommonuiBdltfi Clfllon Co B2/-OD/IB VAHGA- S A
Littniing Branch 1, Hipp I37S3 179 31X F'ich* BO~B47.es/09/10,
E3B 10200070
on B20BOI-31 (, notice
B210060024 Foruiardi IE Imp FlBpt 90-3
of violation
STAHOSTECK.il R Division of J-rojet t It*ild*nt Pragrtm* flB/09/17
O'TaDLEjJ D Con*ollddtiid Ediion Co of Neu York Spp 19615 094
S4X FitJiB 90-a47rQ3/0?/l7.S2100fi0024
Bat0060041 Hottcs of violation from Imp on 020801-31
* Division of Projact i Rut dent Projrann BSfOfft.7
1S615 036 34X Ficha SO-347, 02/0 1 ?/ 17, 021 006003-4
IP.
BSI0060046 IE Imp Hup I BO-S47/B2-18 on B20S01-31 Nonccmp 1 1 ance notoil
failur* ta mulntain con t*inn B ni intgritij for isolation
valv*
REDELOH5KI, T . KOLTftY. P , KIBTEn.H Dlvitlon of Projacfc t FleBtdent
Progrann, 0E/0?/16 ISgtp ISilJ OS? H1X f ic ha 5O-B47. Ba/09/17,
0208170233 IE l n fi> Motle 90-33, Buppl 1, "Lurking S. Di*lodoBil I-1S5
Implant B*di " Bye lift ncl
COBB.L I Dlviilon of Fu.l Fscilltiet, Kt.rlli it Bffuar i
e2/10/04 <Ion*oU(Jjttd EdUon C(* at Ntw Vor* 66np 13761 SEO
24X Fitlii 30~aOO.B2/10/06,fl20B1^0a33
ftck fec.ipt of a20915 Itr informinj NJ?C of st
correct violations noteJ in IE Inip Rept 5Q~247/B2-~1'I
STAFiOsTECHI.R Division of Project Res.dont Progra
O'TDDLE.J D CD,>,Dl3dat d d i s nn Co of N 8W V D r), J B
24X FJche 50-347. 93/10/06, B210130536
--E21013O559 Forwards response to (!"(. B20SI& Itr re violations
IE Ir.sp Ropt SO-217/B2-J4 Corrective actions post-maint '
testsVlnsp per CDL-^1 wi 1 I be ensured All poat-mamt
activities after 82I1Q1 mill be verified
O'TOQLE.J Conso 1 itfated Edison Co of HPUI York 83/09/15
ST^nOBTECKI . R Division of Project t. Resident Programs 1 c
I5AQ3 3D5 24X Firhs 5O-347, 92/10/06, S2lO130-i56
S31O2I&3OO PoruariJa IE Insp Ropt 50-347/62-19
hone Qmp I i^nce rioted
STftllOSTECKI, R Diviiion of Piojett >, Residt
O'TaOLE.J Q Cansolldated Ed nan Co of Neu
34X F-'iche 50-H'l/, D2/10/O7 , 8310210300
890901 -30 No
it Progiarr
Vork
2jip
Bi/m/O?
157(^1 24
--B210360307 IE Insp Rept 5O-247/DS-19 on sao-?01-3O Mo noncomp]
noted Hajor areas inapected licensee mgt changes, operatjona
saFetij ven fication, plant tour* . operab 1 1 1 ty nf CSF.iafsty
sys challenges A LEO follouiups
nEDELOUSl^I.T . POLE*. T , KISTER.H Division of Project (.(I
Programs B2/1O/O6 17pp 157i4 35O S4K Fiche 50-:M7,
B2 102 1 0300
OMH19023Q IE Bulletin 02-03, "Stress Conosian Crackino in fhnl-
Wall, Large-Diameter. Stainless Steel, Flee ircu lation Sus
Piping at Dtlll Plants " 3v t list end
DEYOUN5.H C Director's Office. Office of Inspection and
Enforcement B2/LO/H Consolidated Edison Co of New .nrl
llSpp 15310 125 34X Fiehe 50-000, H2/10/ 14. Q20B190J1H
S Rcportable oc c urrontes. LERs t related
B31001000B Responds to FQIA request for 19 categories of dncuintnti n
nuclear reactor events ( safety problems Forwards ilotumnnti
listed in App A
FELTQW. J M Oivislo-n o* flules and Records B3/Ob/2S UDH I . ft ft
Critical Mass Energy Project I 5pp 15727 005 34X
Ficho 50-OQO, B3/OA/3B.f!2iaOIQOQB
--G01112067' Fnruardt reaponsa to request for determination of litvns
bail* for reactor prosaure vessel t i onto inment tan cooler
SIJE re FGflfi requi roments t/ current WRC criteria Licenses
must perform thermal ft stress analysis at vessel
LftlNAS. C Assistant Director for Safety Assessment
CESENHUT.D DiviEio-n of Licensing 6p p 157^0 OflS
Fiche 50~OOOra?/06/2a, 0210010008
fiOl|2-4002fl Forwards Containment Sijs Qranch discutsion papir ctimnar
facility -event ui/current licensing criteria
RUCENBTEIH. 1. Assistant DirBttor for Core 8. Conta Inmeiil -iyste*!
00/11/07 LAINAS.G Assistant Director for Safety Aisesimmt
6pfi 15733 031 21K Fiche 5O-000, Q2/06/2B. paiOOlOOOH
Q1O1090B 1 J4 ttetcrlbe^ sequence of events leading tn contalndisn t tic,
at Unit 3 Unit 3 should be allowed to vsturn lo ogiuer
operation ponding long-term actions IE Info Notice 80-07 r
containment cooler laafci b press release end
HOODS, H M Office of Inspection & Enforcement, Office of t li r
Director BO/11/13 JORDAN, E L Office of Inspection!
Enforcement, Olfice o* the Director 6pp 19720 033 aiic
Fiche 50-000, aa/os,/aa. asiooioooa
BI030903B? Informs that aafetu Program Evaluation Draneh dc-os not
develop requkrvmrnta for non-RCS leakage detection Brant"
evaluate* proposed req.uir*miin t adequacy in terms of
cust-b enat I 6 anlij*li h possible adverse consequence!
MURLEV, T E Division of 9afto Technology Ql/02/27
etSEWIiUJT, D O Division of Licensing Spp 15720033 HX
FUha 50-OOO. B3fQb/3&, B21001000B
B2100BOOIS Aildl reaponse bo FDIA request for 19 categories of Info
nuclear reactor vnts & safety problems, Forwards dotumtnti
liitsd In App A Documents) in App B complately withheld (rtf
raiA Etemptlan 9)
FELTON.J M, Division of Ru|s nrf Rocords 62/07/12 UDElt . fl A
Critical HMI Enirgi) Project 9pp 15663 037 S4X
FIeh 50-OOO. ea/O7/12i821003001S
BSOS030fil7 Foruardt "Enginaering Evaluation of Indian Point Un%*
Flooding Event of 9OI017 "
L^NHINO.M D DiT-ector'j Office 82/04/22 MICHELBOH. C
Director's Office lp 13665239 24X Fiche 30-000, 02/07 fts
82100B0015
5205030617 "Englnetring Evaluation of Indian point Unit 2 Flooi*i,
Event *f 801OI7 "
LANNINO.W D. Director's Office 82/04/30 H3pp 19663 340.
Ficht 50-OOO r e2/07/ia, 8210060019,
DOCKETED ITEMS
41
e2]006t>:W6 Forwards LER B3-036/03L-0
O'TOOLE.J D Consolidated Edison Co
HAVKES.R C Region 1, Orflce of Dirt
Fiche 50-347,82/09/34,6210060396
of Neu York S3/09/24
:tor lp 1S6IS 336 24X
--B21OOS040O LER B2-036/03L-0 on S20B25. temporary change procedure
authoTired to permit simultaneous operation under load af
tuD diesel generators during surveillance test, potential ly
reducing degree of redundancy Test procedure PTM-21 changed
SMITH; 11 C Consolidated Edison Co of Neti Vork B3/09/24
Region 1, Office of Director 2pp 15615 327 34X
Fiche 50-247, B2/07/34, 6210060396
52!QO7tJ3fil Forwards LER 82-O34/03L-0
a'TQELE.J D Consolidated Edison Co of Neu York 82/09/27
HAYNE5.R C Region 1, Office of Director lp 15634 04.0 24X
Fiche 50-247. 82/09/27. B310070361
DOCKET 30-249 DRESDEN NUCLEAR POWER STATION, UNIT 3
F Security, medical, emergency & fire protection plans
62Q9S90125 Releases public version of revlsad generating station
emergency plan corporate command ctr emerge ncy plan
imp tenanting procedure
FeLTON.J.M Division Of Rules and Records 03/09/16 Document
Management Branch lp 15564 122 SIX FUhe 50-000,83/09/16.
0209290125
B209390IB9 Forwards public version of Revision 4 to generating station
emergency plan corporate command ctr Emergency Plan
Implementing Procedure EQF-3, "Envi ron/Emergencu
Coordinator " Receipt form end
PAJOUBKI.J E Commonwealth Edison Co 02/09/01 EENTON, H R NRC
- No Detailed Affiliation Oiven lp 13364 133 24X
Fiche 50-000, B2/09/IE., B2Q < ?29012S
-82JOO7036S) LER 02-031/03L-0 on B20S2B. during normal operation , charg ing
pump 22 developed leak & uas declared inoperable Caused by
defective gasket on cylinder head A Gasket replaced t< pump
returned tn ivc
' Consolidated Edison Co of Neu York B2/09/27 Region I,
Office of Director lp 15634 061 24X Fiche 50-247,82/09/27,
S3 10070361
0209290225 Public version of Revision 4 to generating station
emergency plan corporate command ctr emergency Man
Implementing Procedure EDF-3, "Environ/EmergenCYl
Coordinator "
PAJOUSKI.J E , LITEnBHI.L A , FLESSNER, S A Commonwealth Edison
Co B2/08/3I Upp 15564 134 SAX Fiche SO-000, B2/09/1 6,
8209390129
C31001O14I Forwards LER B2-033/O1T-0
O'TOOLtt.J D Consolidated Edison Co of Haul Yorfc (32/09/20
HAVNCS. R C Region 1, Office of Director lp 15583 080 24X
Fiche 50-247, B2/09/3B, 8310Q.1014 I
--S21004Q145 LER B3-032/01T-0 on 020817, b loud ouin outer isolation valve
FCV B2I5A failed closed due to failure of solenoid valve
EOV L3I5A Caused bv open circuit In pilot solenoid valve
SOV 1315A coil Coil replaced
FITZPATRICK, B Consol I da ted Edison Co of Neu York B2/OB/31
Region I, Office of Director 3pp 15503 OB9 24X
Fiehe 50-347.02/09/33,8210040141
Forwards LER B2-035/03L-0
O'TOQLE.J B Consolidated EdnOn Co of New York 82/07/28
HAVNES.R C Region 1. Office of Director lp 156BO 241 24X
Fiche 50-347. 02/09/28, B210I304I 1
-U210J30419 LER 92-035/O3L-0 on B20029, nuc loar paiuer range
I n Iruurenta t ion channel Nil became inoperative due to
failure of power supply unit Cause of unit Failure not
stated Defective high voltage power supply removed
(JADIPURAh.P Consolidated Edison Co of Neu York B2/09/2B
Region 1. Office of Director lp 196BO 2-12 24X
Fichfr 30-247,62/09/29,3210130411
2 1 0-290267 Pdrt 21 deficiency rept re potential galling problem
stem & bonn-et of 1 35-inch Ji larger A105 carbon itsel &
AIB3-F22 valves supplied Feb 1991-Aug 19B2 Valves should be
service* & stem Ii/or bontiat replaced
JBAGELLE.L & Convdl, !nc B3/IO/11 HAYNE3, R C Reoion It
of Director 17pp 1 5854 232 24X Fiche 50-000, 82/1O/1 1,
8210290267
8210250145 Forwards LER G2-039/03L-0
D'TDDUe.J D Coniolidated Edi.on Co of Ne
HAYIJES.R C Region It Office of Director
FicJie 50-247,02/10/12,9210350143
i York 9B/IO/12
lp 15797 334 2-1X
8210250149 LER 03-039/03L-0 on 020910. chemi cal sampling indicated
13 15'/, concentration of boric acid in storage tank 22 Boric
acid transfer pump also out of svc for malnt Cause not
stated Contonti diluted
HrfjniCHS,0 Consolidated Edison Co of Neu Yort 82/10/13
Region 1, Office at Director lp 157B7 395 Z4X
Fiche 50-247, B2/IO/ 12, B2I0230145
T H-earino transcripts on non-ant i trui t matters
8210010009 Forwards info to suppl B20701 request fur exempt ion From Apn
R per 020917 telcon Request applies to Sections III O 3 a
& III 3 b re installation of fire suppression sus
RAU8CH, T J CommnniUBalth Edison Co 82/09/23 EISENHUT.D
Division of Licensing 0pp 15565 152 24X FiUie 50-000.02/09/23,
8310010009
2210130376 Advises that Installation of offaite dn9(r calculation SIJB
program fully operational tracking model tc operational
A-model uill be deUgad until 821331 to complete prime
computer installation
SUARTZ.E D Commonwealth Edison Co 82/10/06 DENTdN, H R OF fit. 9
of Nuclear Reactor Regulation, Director 2pp 13602 09B 24X
Fiche 30-000, B2/10/OA, 8310130376
0310390047 Releases puilic version of ravlslons to Quad Cities. Zion
i, Dresden emergency plan anneies tc revneil generating
station emergency plan telephone directory
PEL TON. J H Division of Rulei and Records 93/10/00 Document
Management Branch lp 15S77 313 24X Fiche 50-000,02/10/00,
8210390047
Q2102900AO Foruiards public version of Revision 3 to Quad Cities b 2 1 on
emergency plan ann*", Revision S to Dresden emergency plan
annei, fievls Ion to Byron emergency plan annei fe revised
generating station emergency plan telephone directory
MOORE, R D CommonuF&alth Ellison Co 03/07/30 DENTDN, H R NRC -
No Detailed Affiliation Given 9pp 15077 314 24K
Fiche 50-000, 82/10/OB, B310290047
0210290077 Public version of Revision 3 to Quad Cities t- Zion
emergency plan anneies, Revl si on 3 to Dresden emergency plan
nne< t Revision to Byron emergency plan annex
* Commonuealth Erf 1 a on Co Q3/06/30 lOZpp 13877 319 24 X
Fiche 50-000, B2/10/OHI 8310290047
82102906BB Public version of revised generating otation emergency plan
telephone directory
OALLEiD P Commonuealth Edison Co, B2/OB/12 43pp 18878,318
34X Fiche 30-OQQi B2/IO/00, 9210390047
8210220359 Provides Info re organiiatlon d performance of depti
rtsponilbl* for radiation protection activi tin, per 030702
commitment Training coordinator aiiiflned in Apr 1903 to
improve health physics training programs,
TRAMM.TR Commonuoalth Edison Co S2/10/14 DENTDN. H R Office
of Nuclear Reactor Regulation. Director ?pp 15776 297 84X
Fiche SO-000, 82/10/14tB2103203S9
6210060233 Testimony of JD O'Taole bafore US House of Representative*
Subcommittee on Energy t- Conservation of Committee on
Energy % Commerce re role of put lie participation in NRC
proceeding-* W/Certif icate of Svc Related correspondence
O'TOOLE.J D Consolidated Edlion Co of Neu York 83/10/01 Slpp
15621 204 S4X Fiche 30-247, B3/10/01 , S3I0060232
8210290170 Ad vim that plans t preparedneii for offilt* protection
near facility adequate d ulll be applied in event of
radiological emergency IL State ( local plans approved subj
to verification of adequacy of alerting 1 notification sys
THOMAS, L M Federal Fmirgency Hanigimant Agency 83/10/14
DIRCKS, W J Office of the Executive Director for Operation* lp
13700:803 24X Flcha 30-010- 82/10/U, B310250170,
Ad judi calory correspondent:*
0B10010257 DecUion ALAB-W5 affirmlno LBP-fll-37 !< LDP-BZ-tS,
functioning mod to OL for Unit 3 to permit installation of
five high dimity spent fuel ctorage racks tc authorizing
t*iu*nc* at amtnd* to OLi ^respectively.
TOMPKINS, B A Atomic Safety and Licensing Appeal Panel 82/09/29.
2pp 13571,054 24 X Flche^ 30-237, 92/09/39r 0810010257
DOCKETED ITEMS
P Operating licenie itase documents. * corrtspondano
6210080001 Advises that hoard notification issued on BSO?03 re USB of
auxiliary overhead crane rather than min, overhead cr*n to
move. spent fuel pool racks. should have bren issued in/Number
BK-8s-?-2
HIRftOLIA.F Assistant Director for Safety Assessment aa/09/M
Atomic Safety and Licensing Board Panel 4pp ISfifiB 341 2-tX
Flche 5Q-S37. 82/07-/14. 8210090001
B21QOBOQQE Board Notification 33-13 Informs at ufrll failure to tarry
out fuel pool rack removal t> installation in manner
described in testimony at hearings Auiiliary overhead crane
used Instaaif of ridimdant main overhead crane
rpPOLITO,T A Assistant Director for Safaty AiiBSsment 82/07/03
Atomic Safety and Licensing Boaril Panel Spp 1S460 34 S 24X
Rich* 50-237rB2/09/14,92100B0001
B2092103B3 RBcommendu board notification TI utll use of aunliary crane
inltead of main redundant crane to initall fuel racks. <
4 > tented! in testimony hefor ASLB Licensee hi cormnittld to
follou testimony in computing remaining wort,
IPPOLITD, T A Assistant Director for Safety A*tessinnt B2V09/03
EISENHUT,D Division of Licensing app 1566B 349 24X
6210120105 Recasts delay of Imp 1 ementttan due date* ra NUREQ-0737,
items tl D 3. "Plant Shielding," II D 3, 'Post-rtccia'tnt
Sampling" & II F L 1, "Noble 0*s Effluent Monitor "
SUAHTZ.E D CoiMfionuiealth Edison Co B2/10/04 EISENHUT.D
Division of Licensing 5pp 1 5&51 237 34* riclie 30-000.88/10/04,
6210120105
Forwards Revision 3 of Chapter 1 at "Off lite Dote
Calculation Manual "
GOUDEttp J C Commoniusilth Edison Co 82/10/06 CASE, G Office of
Nuclear Reactor Regulation. Director 2op 15B05 137 24X
Ftche 50-000- 62/10/06,6310360526
EJ2l02t0542 Revision 3 of Chapter 9 of "OffiiU Don Calculation
Manual "
Coffunonkunalth Edison do 62/09/30 S3pp 15805 139 24X
Flche 50-000, B2V10/06. 9210260Sai
Provide* *<U1 guldjnci k clarification re 620606 muoit
for addS info PUT NUREO-0737, It em II H 3, "Poit-rtct irfent
Sampling 3ijt " DstJile-I rellabilltg idalutit not required
bo latisfv NIIC concerns
CRUTCHFIELD. D Qpefating Rtactari Branch 9 BS/10/OH DELOEQROE,L
Commonumltft Edison Cn 3pp IS720 004 24X Ffclra 50-000.
BS/ ia/OB, 8210 18OQ5V.
9210190630 Foruardt aftu evaluation af Uciiue* G304I4 t, 0611
Tfrsponits to NUHEO-0737. Item II E 4 S. "Purgi/Vini Valve
Itolation 0*9 mdabilLtg " Rnpotim accijitablt Topic
reviiu complfttd
CRUTCHPIELD. D Operating Ractori Branch 5 B2/10/I3 uELQEQHOE, U
CammonuBalth Ed i f on CD Spp 1873B- 1T2 34X FUJie- SO-S37,
Q3101?0445 Foruiardi lupplvraental reiaani* to Ocneric Utr B2-05 re
impUmantation itatul of MUREff-0737- I tms II D 3,11 F 1 3,
II F t, 3, II F I 5 ti It F 1 A, In. mtponit to 321006 no.uBit
SMART!. E D Common toe a 1th Ediion Co 53/10/14, EISEKHUT, D
Qlvlliati or Llctniing 5pp 1S741 203. 24X Flch* 90-0-00,82/10/14,
9210170449
9E10S20333 Forward* Info re NUP.EO-0737, Item 1 1 D t. "Performance
Tutini of BWR Bafatij/RellBf V*lvei r " per 830727 requeit,
Info: adeD.uifca!y Jsraom tm t appljcabl 1 ity of riiulti op EWfl
ouncrc group genJflc t*tt rftpt NEDE-S49B9-P to facility
EUARTZ.e D Cominoiiuj.jltfi Edtion Co. 82/10/13 EIBENHUT, D 0,
Civilian of Licaniing I7pp 13776 Oil 24 1! Flche 50-837, 83/10/19,
9210220335
Bai0asdi55 Foruipdi curraclio^i to propond Tach Spie P*s*i 1,2/2,2-1 b
3 3/4- 3-5,. fupportinj rtvUu of futurt riloadi t r-avind
Flgui-a 3 B liBhtet lr providing eKt*n<f*.<i MflPLHOR vt ei|ioiur
CUTVI for barrir led ttit nimbly fuel
RiWSCH, T J Cvnnonuaalth Edi*on Co fi3/tO/lQ DENTON, H R Office
af Nuclear Reactor Rcoulatlan. Dinctor |i|i 13703,333 S4X
Fl ch- SO-OOOr fla/IO/lfl- 9210350193
--aa 10290(77 Errata h Addvnda Sheet B.rtpliEtrf Ptat 4-10 to "LOCA
Analyili Rept for Dr**dan Unit* 8131 Quad Cltiti 1 !< 2
Nuclear Poutr Statlcni "
* Oerral eitttrie Co NEDu-B414aA ERR OB. 82/09/30 3pp,
157BB-S3?, B4X FUha. SO-COO, 82/ 10/16,8810890139
921025006'? Provides addl info re reactor unter claanup room arsa * <r '
monitors Temp element* nauie no automatic plant response
beyond control room alarms
RAUSCH.T J Commonuealth Edison Co 52/10/19 EISENHUT.T)
Division of Licensing 2pp 1 57S7 OBI 24X Fiche SO-000. [!?/ 10V H
8210250069
5210860296 Foriiiardi iafty evaluation of BHFI ouitiors jroup jantrl' 1
response to NUFIEO-0737. I tern II K 3 25. "Effect of LDI of
AC Powtr on Pump Seals " No mod to seal cooling for
r trcolat ion pump raqulred Item resolvfld
CRUTCHF1ELD, D Operating Ruactora Qranch 3 BH/10/21 [)CI(JH>"-.L
Commonuealth Edison Co 7pp 15303 01B 24X FUhe 50~J7i
B3/IO/21. 52102602^6
InspFttion report*. IE Bulletins (. corrBapondei.ee
621006032'' Forwards IE Insp Repts 50-O10/B2-02, 50-237/C12-C-1 (.
50-217/62-03 on 020119-0210 No nont omp 1 lane a noted.
LITTLE, M S Dlviiian of Engineering & Technical Programs UJ'GJVj"
BEED.C ConmonUBalth Edison Co 2pp 15M5 331 2*K
Flehe 50-010,82/09/32,13310060329
8SJ0060335 IE Imp Ropts 50-010/82-02,50-337/112-03 t 30 3-TmlJ C'l i>
620119-0218 No noncomp 1 iance noted MQJOT aruaa lnt[-ect*il
open ! unreiolvad items t item* of noncomp 1 lance it
integrated le* rats test
REIMANNiF W negion 3, Office Df Director JACKIW. 1 Ol*l*i-.
of Engineering b Technical Programs aa/Qf/31 ipp
SIX Fiche SO-OJO. 03/09/23. 3310060339
B2101S05B3 Forward! IE In>p Repts 50-010/82-1 3, 5Q-!j;i7/lia
30-a49/Ba-lB On B2Q7QB-QB09 ti notice of violation
STREETER.J F Division of Project V Resident Programs
REEO.C Commonualth Edison Co 2pp 15713099 2*X
Ftcbt iO-OlO, 8S/O9/3B, 0S1 01 30323
B210150530 Notice of violation from imp on B30700~Otll)V
BTflEEIER. J F Division of Project I- RaaidBtit Program tV'CK
(p 15713 101 SIX Fich. 50-010, 82/09/33. Ba!Ql!10Bi!'t
Bal01S053H IE Imp Ropts 50-010/82-13,50-237/02-17 f, 10 a*<Jm.' II
62070B-OB09 Nnntomp 1 lance noted failure to ittui * perform
*ir preiiure tett procedure
TONOUE, T M , JORDAN, H J , WALKER -R D Division of l'rtlj*cl I,
Rtsiifent Projram B2/07/HB Qpp 19713 10B J4X
Fitht 50-010,62/09/29, B21 01 50523
6210060359 Ac k receipt, of 820910 Itr informing Nile of tpi 1*1 t" t
correct violations noted in IE Insp flepts 50-237/Hl' :\'l.
30-249/81-32, 50-3S4/BI-23. 50-365/B1-23. SO-295/fll~'ll t
50-304/91-29
SPES3ARD, R L Division nf Projoct tt notidont Progrjim
ftEEDiC ComnonuiBaltfi Ed I tan Co Ip OAIO .134 lt*K
Fkhfl 30-000, B2/IO/OI.B2J0060339
0310060367 Responds to NHC 6207 12 I tr r vlalatlont nnU4 in U
Repts 50-837/61-39,30-249/81-32, 50-294/81-23, 30-af,1/||| a |
SO-293/B1-31 l> 50-304/81-29 Corrective ctlonl Lraininj) r^t
mgt prloTltli re plant availability uill hi tOndtjtm
ftEEO.C CommoniuejrUh Eittian Co B2/09/10 KCfTIIH.,! fj a,
3. Office of Director 13pp 19610 395 94X
Flche 30-000, B2/IO/01, 921006035-7
6210080178 Foru*rd* listing of piping sui which fall to i tfj*t
requiramentt. or KRC BOOB1B confirmatory action Itr lh
Bulletin 79-14 operabllity evaluation update* ul 1 I nol ^i
provided for Dretdan & Quad Cities Final update by Ott i"Jdj
BAUBCN. T J Comnonuiealth Ediion Co 82/10/01 KIPI'IIR j c
3, Offic. f Dirrctor 6pp 15640 159 H4X Flche flri CK,i, lyjtt
BZ100SOI78
B21O150539 Forward! IE Inp R*pti 30-010/63-13,
30-24^/62-ao on BSOB30-0903 No noncomp 1 lane t no tad
PAPERIEULO.C J Division of Emtrgency Preparedntti U
Support aS/10/01. REEDiC, Commonuiealth Edltan Co
IS7U.179 34X Ficha. 30-010.82/10/01,881013033'?
8210150543 IE Insp Rpts 30-010/02-19, 50-337/flS-l) I. M) a*.
820830-0903 ti 0? No noncomp 1 i anc nattd rlajor arrii
ln-sp*ctid confirmatory m*aiyr*mnt programrQC pr|f* n
analytical measurementl ti environ monitoring progrtN
SCHUMACHER, M C , NICHOLSON, M A , JANUBKA, A Dlvll|i
Emergency Pr(pndn*ss tc Dprt(onl Qupport
15714-177. 24X Fiche 50-010,02/10/01,88101005^9
82100B0190 Confirm* 821103 enforcitnent confarine* t
aspects atmc iatd u/pracurafnmt, Initallatlon L ITS* of
nan-qualiritd valvi guldis in > lictromagnet Ic rtllll v
t cilHiis.
8PES3ARD, R. L. Division of Project b Rlltdint Pro(rj t
REED.C, CDnmonuaalth Edlion Co Ip 19640:101, SU
Fich. 30-000, 82/10/04, 9810080190
DOCKETED ITEMS
43
Notice BO-35, Suppl 1, "Loading t Dislodged 1-125
vc list end
sion of Fuel Facilities, Materials & Safeguards
of New Ynrk 66pp 15761 350
IE Inf
tmpljnt Seeds "
COBBi L I Divi
32/10/06 Consolidated Edison C
24* Fiche 5O-oaO.B2/IO/O4,S2Gai9O233
S2GB19023B IE Bulletin B3-03, "Stress Corrosion Cracking in Thiclr-
Uall. Large-Diameter. Stainless 5tee I, floe irru lation Sys
Piping at BUR Plants " Svc list end
DEVaUHO.H C Director's Office. Office of Inspection and
Enforcement B3/10/H Consolidated Edison Co of Neui Vor fc
I15pp 15910 135 SIX Fiche 50-000. 82/ 10/ I 4, B20819023B
8210130197 Forwards LER 82-034/03L-0
SCOTT.D J Commonwealth Edison Co 82/09/28 KEPPLER! J O Region
3, Office of Director Ip 13&74 117 24 X Ficfie 30-249,83/09/38!
8210130197
9210130201 LER B2-Q34/03L-O on 330901. investigation revealed that
substandard electromatic relief valv* main valve disc guide
sleav* utilized on ERV 3~2O3-3C Causerf bij personnel error in
ordering sleeve Sleeve mill be replaced
HOLLAND.? Commonwealth Edison Co B2/09/B8 Rogion 3, Office
of Director 2pp 19674 110 34X Fiche 3O-249. ea/09/EB,
8210130197
i-odic operating reports & related
spondence
6^10180097 Foruards monthly operating repts for Sept 19H2
SCOTT.D J Commonwealth Edison Co 83/10/01 Director's Offin
Office of Inspection and Enforcement Ip 1371B 001 34 X
Fich< 50-01O. 83/10/01. 8310180097
821O180100 Monthly operating repts for Sept 1982
SCHROEDER.D A Cnmiionuea 1 th Edison Co B3/1O/OI
1371FJ 002 24X Fichu 5O-OIO, B2/10/01, B2101B0097
22pp
B3101904S9 Forwards LEO 83-036/O3L-0
SCQTT.D J Commonwealth Edison Co B2/10/05 KEPPLER. JO Region
3. Office of Director Ip 15735 319 24X Fiche 30-249,83/10/03.
Q210I904SB
8210190471 LER 83-03&/03L-0 on 920912, dur in g startup 6 4SX p QUIBT.
annunciator 903-5-N-4 Indicated turbine pressure operator
load rejection d turbine stop valve icrimi bypassed on one
subchannel of Channel A half tcram circuitry
TURNQUESTiL Cofnmonuiaa 1 th Ed I ton Co 33/10/05 Reoinn 3.
Office of Director 2pp 1573S 32O 24 X Fiche 50-249,02/10/05,
S21019049B
Reportahle occurrences, LERs t. related correspondenct
6210150097 Forwards LER 81-026/03L-0
SCOTT.D J Commonwealth Ellison Co B1/1O/13
3, Chicago. Office of the Director (01/03/01)
Fiche 50-249, Bl /1O/13, B210! 50097
KEPPLER. J Region
Ip 15701 103 34X
B21Q1501OZ LER 8I-026/03L-0 on B10915, uhl 1 e shutting doum, rod P-IQ
itiouEd uirong position on rod worth mlnimiier Caused by
several diode Failures on tuo digital output printed circuit
boards Boards removed, repaired k tested satisfactorily
SCHnaEDEII.fi Cammonuealth Edison Co 01/09/29 Region 3.
Chicago. Office of the Director (81/03/01) Spp 1B7O1 1B3 24X
Fich* 50-349,81/10/13,0310150097
B21O37025I Foruarils LER Sl-040/on~0
ECOTT.D J Commonuealth Edison Co 81/12/15
3. Chicago, Office of the Director (Bl/03/01 I
Ficne SO-249-, E1/L2/1S 1 821037029!
KEPPLER.J Q Region
Ip 15B29 233 24 X
B3lO27035fl LER B1-04Q/01T-0 on 811301, when R< pressure decreased to
32 pttg.rod N-9 notched from position 03 to 04 & then to
position 06 Cause unknown Uoi-k request issued to check
single notch control auitch during next refueling outage
SCHROEDER.B A Commonwealth Ediion Co Bl/12/07 Region P.
Chicago. Office nf the Director (S1/O3/01) 3pp 15S29 234 S-JX
Fiche 5O-249. Bl/12/15, 8210270251
Forward* LER B2-035/03L-O
SCOTT.D J Coramonuealth Edison Co B2/Q9/ 14 KEPPLER.J Region
3. OfPue of DiTBctor Ip 155SI 307 24X Fiche SO-249, B3/09/I6,
B2 10010 126
0310010137 LER ea-03S/03L-0 on 820905, during testing of control rod
drive H-4 for pvertrave 1, overtravel alarm came up fc position
Indication loit, ind icat ing uncoupling of control blade from
drive Probably caused by Inner filter becoming detached
MHALEIJ, H Commonuealth Edison Co B2/09/1A Region 3, Office
of Director 2pp 1S3S1 208 24 X Fiche 30-349, B2/09/lfii
6210040136
B2102S030& Forwards updated LER 82-029/01X-1
SCOTT. D J Commonuealth Ediion Co B3/09/22 KEPPLER, J Region
3, Office of Director Ip 13791 030 24X Fiche, 50-B49, B3/09/H2,
B31O330306
--B2102S0316 Updated LER B2-029/01X-1 on 6207 12, magnetrol iiuJtche* 82C t.
82D did not trip uihen tested for proper tripping upon uater
loading Cauie not in own Visual Imp, revl eui ti weekly tilting
revealed no abnormalities Vendor revlaiu end,
VWALEN, R Cominonuealtn Edison Co 82/09/SS, Region 3, Office
of Director 3pp 13791 039 24X Fiche SO-249, 82/09/82,
8310250306
S3 102 50328 Forward* updated LER B2-023/01X-1
SCOTT, D J C omnia nuea 1th Edison Co 82/09/23 KEPPLER.J & Rvgion
3. Office of Director Ip 15790 OSS 24X Fiche SO-249, B2/09/B2,
82 102S032B
B2102S034B Updated LER 82-023/01X-1 on B203IO, no loui pouer range
monitor input to rod block monitor (ROM) notid during OOP
700-E3 Caused fru shorted steering diodes on several RBM
cards Defective diodes replaced
MORGAN, W Commonwealth Edison Co 02/09/22 Region 3. Office
of Director, 2pp 15790083 84X Fiche 50-249, B2/0 9/22,
821O25O328
8210190403 Forwards LER 92-037 /O3L-0
SCOTT, D J Commonuealth Ed it on Co BE/1 0/04 KEPPLER.J Q Region
3, Office of Director Ip 15740 33i 2lX Fiche SO-249, B3/ 1O/O6,
B210190403
0210190412 LER B2-Q37/03L-O on 020922, trana 1 ant in-tore probe ball
valve 3E mould not reclose Caused by IDS* of tension in
high tension spring in drive m&chanlim Valve closed t< spring
retenlioned
MOROAM.W Commonuealth Ediion Co 82/1O/Q6 Region 3, OPficn
of Director 2pp 1574O 397 SIX Fiche 50-249, B2/10/Oi,
B21 0190403
DOCKET 50-250 TURKEY POINT PLANT, UNIT 3
F Security medical, emergency & Fire protection plans
0209170062 Foruiards Revision 6 to physical security plan Revision
uilthhild (ref 10CFR73 21)
UHRIO.R.E Florida Power & Lioht Co B2/09/OB EISENKUT. D O
Division of HcTHing 2pp 14910 Oi9 24X Fiche 30-250,82/09/03.
02O91700&2
8210190179 Releases public veriion of emergency plan implementing
procedure
FELTON.J M Division of Ruin and Records 92/09/30, Document
Management Branch Ip 1575B 06-2 24X Fiche 50-250, 32/07/30,
8210190170
B2101901S6 Foruards public version of Emergency Plan ImplementinD
Procedures 20104. "Emergency Roster, " aolOl, "Duties of
Emergniy Coordinator," 2O1O7. "Fir e/Eplqi ion EirBrotnc iee"
% 20127 "Dutle* of Assembly Area Supervisor "
UHRIOiR E Florida Power (c Light Co, B2/&7/24 O'HEILLy, J P.
Region 2, Office Of Director Ip. 1373B.Q63, 24 X
Ficht 50-250,02/09/30, B210190I7S
8210190194 Public version of Emergency Plan Implementing Procedures
30101, "Dutiei of Emergency Coordinator," 20104, "Eflroencu
Rosten " 20107. "Fire/Exp loi on Emergencies" & 20127, "Dutle i
of Assembly Area Superviior "
Florida Pouer & Light Co 62/09/14 50pp 19739:064 H4X
Fiche 30-230,82/09/30, S21Ol?017a
S210190440 Extend.* Invitation to obterv* 021019 dtmonstr*tlon of
emBrgeney response sys at Technology for Energy
CorpiKnoivllle.TN
UHRTO.R E Florid* Pouier S. Light Co, 83/10/12 EISEMHUT. O, O.
Division of Licensing Ip 1974I:1B&. 24 X Fiche 30-OOO. B2/ 10/12,
9310190440
3210330244 Foruards revision! to physical security plan. Revisions
withheld (ref 10CFR73 21
KAMMER.D.B Tennessee Valley Authority BS/10/19 DENT DM, H f!
Office of Nuclear Reactor Regulation. Director, Ip 13769,343, 24 X
Fiche SO-B30, B2/10/19, 8810230244
0210280S91 Foruards Revision 1 to lOCFRSOApp R fire protection revlciu
Revision corrects tupographlca.1 rrorc In 820701 submlttal
UHRIOiR E, Florida Pouer b Light Co 83/10/32 EISENHUT. 0, O
Division of Licensing, Ip ISSBB'OBO, S4X Fiche- 30-2BO, B2/ 10/H3,
8210280271.
DOCKETED ITEMS
3210230293 Revision 1 to 10CFR50 App R firs protection rtvicu
* FBorldi Power 1 Light Co 02/10/23 63j>j> 15039 OBI 24X
Fiel*B 50-250,62/10/22, 8210380391
P Operating license stage document! & correspondence
9210070007 Responds to FOIA renuut for tight tstejories at retards re
steam generator! tt ttntti turbines App A, documents provided
in R Udell FOIA Request 91-313 Farmsrds dacumintt li*t*d in
App B
PEL TOW, J rt Diviilon of Rules and Rstords BB/08/JO LONO, D J
Winthrop, Stimiom Putnam & Roberts 9pp 1 5443 063 3-fX
Flehe 30-000, 82/08/10. 8210070007
B3JOI30&21 Summary of itt Interview full tuning 820713-15 audit of
pre*suri i ed thermal shock in-plant training programi d
opt rating pracsdura*
CROTEI-JHUIS, M Operating React or t Brancn 1 02/09/15 Operating
RtacEOr* Branch 1 5pp J5672 3*1 24 X Flche 50-250. B2/09/ IS,
6210130621
B2102B0013 Responds to FOIA requeit for all i nterna I j non-pub I It
documeti ti i nemos. evaluation rept* i other matl dealing m/
nuclear plant operations Forwards document! lilted In App tt
FeLTON.J M Diviiion of flules and Record* B3/Q9/17 flCINNIS.*
IJtui t, dburver flpp ISfiiO 045 24K Fit JIB 30-000, 83/07/1 7.
8210200013
820B310034 Forwards draft Info notice re deficiencies in *ir filtration
fc ventilation iys Notice b*ee! on radioactive r.ain relt-ao
at Pilgrim 1 fc on four r*latd *v>nt* at other plants
involving deficiencies in jnalnt & tistlng of Filter lui
MATT80N, R J Dlvlilon of System* Integration (pott 81 1003 J
BS/Oa/OS JOHDAN.E. L Division of Enginttrlng & duality
AtUTanc. 3pp ISB61.034 24X Flche 50-000.63/09/17,8210330013
&2t02BOlOO Notlfiti that on 920224, Aldirtan adviiid that rapt tant r
pot ilb IB uilllPul violation of nporting T nuir^minti &
f*liif Icatlan of OA & guard quallf leation rtcord* it
63/03^01 Offie* at
lcho 50-000, B2/09/1 7.
E OfMc* of Importer J. Aurfitop
Insjuctor b Auditor lp 19861 037 SIX
B2102B0013
62100SOSS9 Rnut luhmittal of f*ei for BSObOt, rv^uait for Ttch Spec
ctiangtt r* dagradld grid voltag* 4 S30B10 nqueit for
appro vi I of mod* to turbine runback |.y*
DIOOB,ft M 4.ic*n* Fit Hjn*atm*nt Branch 32/DY/23 UHRIO. R, E
Fieri if* Paw.r tt LJ)ht Co lp I3fr6 2W 2fl)l Fteh* 30-230,
02/09/23,5210050509
3210370353 Fq-rwarili util 621012 I tr containing paijmint of LlCinu ttf
ft* r> r-cdundancij in RHR iijs rcquotcd in NRC B20B16 t tr
UHRIOiR E Florida Power & Light Co 82/10/21 DIGGB, H M List,,
F*t Manqiinent Branch lp 1 5B28 279 24X Fiche 50-330. BJ/ 10/91.
8210270253
Inipctiun report*. IE Uulltin* tt e oireapnndeni: e
B21007Q007 Sepond> to FDIA request for eight categories of TitorAt
steim gntraton d iteajn turbines App A documnnts pravidtd
in R Udell FDIA Requagt 31-313 Forwards documents liit*d In
App B
FELTON. J H Division of Rule* and Records 82/09/10 LONO, D J
Mlnthrop, Btimion, Putnam * Roberts 9pp 15645 Oi3 3*31
Flctif 5O-000. 92/08/10,8310070007
B2 10070 139 Forward! tabulated data on steam generator
facilltla* Dti should tin provided to licensee*
IPPOLITO^T Operating Reacton Aiiesment Branch
VAROA, 9 Operating Reactors Branch 1 3pp 19643
FIchB SO-OOO, 82/OB/IO, 8210070007
B210070172 Fo-ruiarda info re iteam gEneratnr integrity t iniji *l Jl
operJtlns PURt-ptr 730320 t, 21 requests Details of lntpi>
including defect Indici t ions, tube plugginu criteria 4 tubri.
plugged ul I 1 not bo provitfid eicept for Point Beach 1
HOLLER, K R Division of Reactor Licensing <NRR-]v73 onlyl
73/03/24 MrtCCARY.R R Division of Technical Revliu (lfflR-1^^5
onli;) 5pp 13645 194 24X Flche 50-000, B2/OB/IO, QBI0070007
B2100103(6 Ack receipt oF 9^0B35 Itr informing NHC of ittpi takin tt
corrct violation* noted in IE Insp flspt* 50-350/02-21 tc
50-231/82-24
DANCE, H C Division of Prqject ! Resident Projrams OZ/09/13
UHRIO, K E Florida Power & Light Co lp 19568 &24 ;MX
Flche 30-350, 82/09/13, B21Q010316
9210010321 Retponds to NRG 820736 Itr r* violation! nat*d In It l*i
Repti 50-2SO/Ba-24 (c 50-351/B2-24 Corrective action* plant
manager dlicutteil need for Increased control of activLltil
affecting fire barrinr penetrations ui/const personnal
UHHIO.R E Florida Power (< Light Co B2/Oa/S3 Q'ncllLV. J P
Region S. Office of Director 3pp 13968 223 34 K
Fiche 5O-25
82100103S? Forwards IE Inap Rejjta 50-250/BH-2' t. aO-2Bl/OB M4 an
aaOSSi-OiSS t< notice of violation
LEWIS, R C Division of Project & Resident Program* DJ/07/Jt
UHRIO.fi E, Florida Power t, Light Co 2pp 13560 330 Bit
Flcht 50-230, 63/09/13, 8210010316
eat0010B.?B Forunrdi rspon* to NfiC 930219 Itr pgiiuittlng addl Irvfo r
anvlron q,ual 1 f icJt ion of TMI action I temt contalnrd In
NUREO-0737
UHRIO, R G. Florida. Pouur fa Light Co, 92/09/84 VAFlOA.g, A,
Opvnting Rtactart Brnncti ) Sipp IS 373 1SS 24X
FieJif 3Q-2BQ. 03/09/24, BB100l029iS
B2l004QaBl ForuiArdi rvitii chadult far providing final retponn ra
control of hav^ laadi on Ouldtlin* 4 dpgclal lifting
dvvicit) t. Oulrfelln* 7 (cranf deslg-n> Only manufacturer*
can obtain rvquetttd Info
UHRIOpR E FlOTid* Power b Lljht Co, Ba/0?/ao, VAROA, B A.
Operftfelnd R*ctort Branch 1. 2pp. 18621,163, 24 S
Fi<h*iHO-a5tt.
B2101&0107 RtvUd pplU*Uan for ftmendi 97 I Bl to
DPfl-41. rsp*ctlvH)'SiiTr*ctIng tvpographlcl e/rro
I>PH-3l t>
OHR
DHRIQrR,E FHrlda Pnuer S< tight Go BS/10/JI EIBENHUT. D 0.
DlvU(PH of (.Utnitng lp. 15704;OES. a*X Piche: 30-280, BB/ 10/11,
ea i oiso-107,
(Jorricttd p*gtt to Tech eptti r* BUR u r repkaclno
B01230 tubmUt'l.
Florid" Power & Light Co 38/10/11, Bpp, 15704,026
o, ea/io/i l, aaiojB0407.
851013043*? MviiM tN*t rfvLnw of current statut of nucl*r pouitr plant
staff marling hourt par 9anirlc Utr BH-K indUtt
rtituirementf *dnwtflv *nforc*d b-u Jncprportlon In
ai)iniiiitratlv procvrivrit Amtnrf to Tach Sjie unn*c*t*ru.
UHfltIOip,e. Florida Peuir t Liaht Co- 82/10/12. EiaE-NHUT^O. 0.
004. Z4X Flch. OO-Z
611 019055? Fnrwarijt puiflnt of prfl r o** d llctni* mend fit r>
rtdundancu In flHR *i|".
UHRIOtft. E Florid* Power & Lijht Cq, B3/10/18. MH-1.ER, H, 0.
Llcent-i Fie Hng*n*nt Prnch, !>?> 15733:014. 24K
--9210010339 Notice of violation from imp on 020826-0633
LEWIS, J? C Division of Project tc Riiident Programs OS/ 07 fit
S P P !55iS 330 34X Flche, 50-250, 32/07/13.0310010^16
8310010346 IE Insp flipts 50-250/B2-24 & 30-251/83-S.l on f)3092t. OW
Noncomp Nance noted Inadequate corrective action allouid
recurri-neo Df reportabl* condition re failure to adfiire la
radiation war* permit
TOOT-LOWELL, R . JULIAN- C Dlviilon of Project d l)4il<l|iil Pre|ra>t
B2/Q7/26 6pp [SiB,E3a 34X Flche 50-B50. 02/0?/ 13. OSIOOtC) i
0209190233 IE Info Notice B0~35, Suppl 1, "Leahing I, DUloJ)fJ 1-151
Implant Seeds " Qvc lilt end
COBBrL, I. Diviilon of Fuel FacilltKsr Noteriali (, Btfiguirfl.
62/10/04 Cons.nl (dated Editon Co of Neui York iipp I97&I JV3
24X Fie he, 80-000,02/10/06,8808190233
B2 1 0220394 Ach rvcaipt of 820927 Itr informing NRC of tttpt tjVcn ti
corrict violation* noted in IE Insp Ripts SO-290/B3-BO i
50-SSlfBS-Se
LEHIBj R C. Divliion of Project ti Resident Pragrami Q3/lO'OD
UHftlO.R E Florida Power t Uight Co lp 15776 093 R4IE
: 90-230, 92/10/08. 8210220296
1210320304 FUtpondl to NRG 820326 Itr re violations ndtl-i In 1C T
Rfftt 5<J-EBO/aa-2B h 90-291/QB-3B Corrective actloni *c<til
log ef tab ll-fhtd to control accin to high radiation araf
AUrm 1^1 Initallid on Unit 3 RHR pit acc>* gate
UHIOrR.E. Florida Power j, Light Co B2/09/27 a'REILtV. J (
Region 2. Qfftc* of Director 2pp. 13776-094. S4X
Fithe.BO-K30, 83/10/06,0810380296
eaioaaoato FOTWW*! IE tnp Ript so-aao/sa-aa t.
980426-0723 b notice of violation.
LEWIS, R, Q, DtvUIon ef Projict ti Rviidan'- Program*
UHKIO.fi C Florida Pow.r J< Light Co. 3pp 10776 '094
: 80-230, 62/10/Oa<a210Sa02fi
941
-8310230317 Notice of violation from imp on B2Q626-072B
* Dlvlflon of Project * Riid*nt Programi.
15776; OS'S. &4X Flchl' SO-SSO, 82/10/08,821 0880396
DOCKETED ITEMS
45
--331022032? IE Insp Repts 50-250/02-20 J. 50-231/32-28 on B2O626-0725
Hone amp lianee noted on B2O7O1 , ground level gates to Unit 4
HUH pit stairways, surveyed at date rates exceeding 1,000-
I'ounrf opin If unattended
VOOT-LCyELL.R . JULIAN. C Division at Project t, Resident Programs
82/08/24 Spp 15776 099 24X Fiche 50-250,02/10/09-8210230294
8210190440 Eitends invitation to observe 821019 do
emergency response syi at Technology for Energy
Corp.Knoiville.TN
UHRIO, R E Florida Pouer !, Light Co 83/10/12
Division of Lioniing Ip 15741 186 24X FIc
821019044O
EIEENHUT, D
B 5o-ooo.es/io/is,
B2101 I KI35{ Advises that util review of current nuclear plant itaff
iimrfclnj hours indicates that overtime restriction* meet
intent of revised NRC policy Requirements incorporated in
jjni t n i strati vt procedures need not be added to Tech Specs
UHRIQ.R Florida Power fc Light CD 82/10/12 EI8ENHUT, D
Civilian of Lictnling Ip 15742 111 24 X Fiche 50-250, S2/ 1O/12.
821O 190351
930819O239 IE Bulletin 93-03, "Stress Corrosion Cracking in Thick-
Ual 1. Large-Diameter, Stainless Bteel . Rec Ireu latian Bus
Piping at BUR Planti " Svc list one 1
DEYOUMQ, RC Director's Office, Office of Inspection and
Enforcement G2/10/14 Consolidated Ed i tan Co of NBU York
IISpj). IS810 125 24X Fiehe 30-000, 82/1O/ 14. 0200190238
8 Raportable occurrences, LERs d related correspondence
B2100SCHO4 Foruards "Engineering Evaluation of Fteduater Transient fc
Sui Pipe Dpeat at Turkey Point Unit 3 on 801119," In
response to request re Congressman DD Faicell 010129 1 tr
MCCHELSON.C Director's Office 81/03/O2 REHM. T A Office of the
Encutive Director for Operations Ip 15670 001 24 X
Ftch* 90-230,81/03/02,8210080104
B21009O252 Foruards LER 82-Q12/01T-Q
UILLIAMS.J W Florida Power b Light Co 82/10/O1
Region 2, Office of Director ip 15638 113 24X
Rich*- 90-250, 02/10/01, B2100B02S2
O'REILLY, J P
--821QO8G257 LEB 82-012/01T-0 on 820917. inp revealed that electrical
p*n tT-ation did not meet double barrier criteria at 10CFHSO
!. testability requirements of App J Caused by failure to
properly document plant changes Plant change implemented
PACE.P L Florida Poluer d Light Co BH/ 10/01 Region S, DPflc
of Director 3po 13638 113 2flX Fiche 50-230,02/10/01,
6S1OOB0252
B210H601.lt Forwards LER 02-013/03L-0
WILLIAM8,J H Florida Pouer 5. tight Co B2/10/1B
Ftfli(m S, Office of Director Ip 19799 103, S4X
Fiche 50-2SO,a2/10/lEtr0210260116
O-fiEILLY, J P
9210280291 Forwards Revulon 1 to 10CFR50 App R fire protection revieui
Revision corrects typographical error* (n B20701 sufimittal
UHRIO. R E Florida Pouer & Light Co 82/10/22 EISENHUT, D
Division of Licensing Ip 15B3S 080 24X Fiche 50-250,82/10/32,
82 10280391
8310280293 Revision 1 to IOCFR50 App R firB protection review
* Florida Pouer t. Light Co B2/10/22 63pp 1 5838 081 34 X
Fiche 50-250,02/10/22.8210200291
P Operating license stage documents t* correspondence
8210070007 Respond! to FOIA request for eight categories of records re
steam generator* tt steam turbines App A documents provided
in R Udell FOIA Request Bl-313 Foruardt documents lilted in
App B
FELTON, J H Division of Rule* and Records 02/08/10 LONQ, D J
Winthrop, Stlmion, Putnam & Robert* 9pp 19i4S 063 24X
Fichi 50-000, Q2/OB/IO, 0210070007
8210200013 Responds to FQIA request for all i nternal. non-publ ic
documents, memos, evaluation repti t- other matl dealing u/
nuclear plant operations Forwards documents listed in App A
FELTON.J M Dlvisinn of Rules and Records 83/O9/17 MCINNIS, D
Neuis b Observer 3pp 1 SBiO Oi5 24X Fiche SO-ODD, 02/09/17,
0210280013
0210280100 Notifiei that on 020224, C Alderson advised that refit sent r
possible uiillful violation of reporting requirements t
falsif ication of OA d guard qualification records at
facilities
RESNER.K E Office of Inspector & Auditor 02/03/01 Office of
Inspector b Auditor Ip 15861 039 24 X Fiche 50-000,02/09/17,
82102B0013
8210030589 Requests submittal of fee; for 830406 request for Tech Spec
changes re degraded grid voltage t< 020010 request for
approval of mods to turbine runbacfc sys
DIOOS.R M License Foe Management Branch 02/09/23 UHRIO, R E
Florida Power (< Light Co Ip 15626 290 24X Fiche 50-230,
82/09/23, S210090509
--9210260117 LER 02-013/03L-0 on 820917, iteam turbine pressure control
valve CV-37O7 did not close completely, resulting in poor
pressure b causing >afetu relief valve to trip auxiliary
f tiediiiater pump C Caused by foreign natter under valve seat
PACE.P.L Florida Pouer h Light Co 82/10/18 Region 2, Office
of Director 3pp 15799 106 24X Fiche , 50-230, BS/10/18,
3210260116
021001089B Forwards response to NRC 020217 Itr requesting addl info re
environ qualification of TMI action items contained in
NUREO-0737
UHRIOrR.E Florida Pouer k Light Co B3/O9/24 V ARC A, 3 A
Operating Reactors Branch 1 S6pp 15S73 125 24X
Fiche 50-230,92/09/24,8210010392
DOCKET 50-251 TURKEY POINT PLANT, UNIT 4
F Security, medical, emergency t fire protection plans
02Q917OO&2 Forwards Revision 6 to physical security pUn Revision
withheld (ref 10CFR73 21 1
UrlttlOjR E Florida Pouier & Light Co 82/09/00. EIBENHUTi D
Division of Licensing 2pp 14910,069 24X Fiche 80-S30i 02/09/08,
8209170062
02-10190178 Releases public version of emergency plan Implementing
procedure
FELTON, J H Division of Rules and Records, 83/09/30. Document
Management Branch Ip 15738 062 24X Fi ehe. flO-230i 82/09/30i
8210190178
921Q19O106 Forwards public version of Emergency Plan Implementing
Procedures 30104i "Emergency Roster," 20101, "Dutie* of
Eimrgeney Coordinator," 20107, "Fire/Explosion Emergencies"
& 20 127 "Dutie* of Assembly Area Supervisor "
UHRIO, R E Florida Pouar & Light Co 82/09/24 'REILLY, J P,
Region 2, Off Ic* of Director Ip 15798 063 24X
Fieh*. 30-290,02/09/30,8210190178,
821Q19O194 Public version of Emergency Plan Implementing Procedure*
H01O1, "Duties of Emergency Coordinator," 201O4, "Emergency
Hotter," 20107, "Fire/Eplosion Emergencies" b 20127, "Duties
of Audibly Ar'B Supervisor "
* Florid* Power i Lioht Co 02/07/16 SOnp 137SB'Oi4 24X
Fiche 30-290,02/09/30,8210190178
0210060281 Foruards revised schedule for providing final response ro
control of heavy loads on Guideline 4 (special lifting
devices) & Guideline 7 (crane design) Only manufacturers
can obtain requested info
(JHRIO.R E Florid* Pouer t< Light Co 02/09/30 VAROAi S A
Operating Reactors Branch 1 2pp 15621 162 24X
Fiche 30-290,82/09/30.8210060281
8210130407 Revised application for Amends 07 b 81 to Licenses DPR-31 &
DPR-41, respec tlvely, correct ing typographical error* re DHR
sys
UHRIO, R E Florida Pouer t Light Co 82/10/11 EISENHUT, D
Division of Licensing IP 15704 029 24 X Fiche 50-250,03/10/11.
8210190407
0210150413 Corrected pages to Tech Bpecs re DHR sys, replacing pages in
801230 submlttal
* Florida Power & Light Co 02/10/11 2pp 13704 026 24X
Fiche 50-250,02/10/11,8210130407.
8210150439 Advises that review of current status of nuclear pouier plant
itaff working hours per QenerU Ltr 82-22 Indicates
requirement! adequately enforced by incorporation in
administrative procedures Amend to Tech Bpecs unnecessary
UHRIO. R E Florida Pouer b Light Co. 02/10/12 EIBENHUT.D
Division of Licensing. Ip 13705 004 24X Fiche 50-250,03/10/12,
0210190439
8210190559 Foruards payment of proposed license amend fee re
redundancy in RHR sys.
UHRIOifi E, Florida Pouier It Light Co 82/10/12 MILLER, H
Llcen*e Fee Management Branch 2pp 13733 014 24X
Fie he. 30-230, 02/10/12,0210190999
46
DOCKETED ITEMS
Q210S20090 rtdvisei that procedures/plans submitted For l/nlt 3 for
steam generator repair project apply to Unit 4 1 need not
UHH!"R E" Florida Power b Light Co B2/EO/15 E1SENHUT. D G
Dwlnon of Licensing lp I577B 163 24* Fichu 50-251, B2/ 10/15,
621032009O
921O27O253 forwards util B21012 1 tr containing payment of license amend
fit re redundancy in RHR sys requested in NRC 820316 Itr
UJIftlO.R E Florlila Power (.Light: Co B3/10/21 BICGS.R M LitsniB
Fee Management Branch lp 15B2B S7B 24X Fiche 50-230, BS/ 10/21 ,
B31Q27O353
Q Inspection reports. IE Bulletins ! correspondence
0210070007 Responds to FOIA request for eight categories of records TO
stam generators S, iteam turbines App A documents provided
in Ud*ll FOlft Request Bl-313 Forwards documents luted in
App- B
FELTQN.O M Division of Rules and Records 82/09/10- LONQ, J
Winthrop, Stimson, Pu tnam t J!ob ert* ?PP 1S4450A3 34X
Fiche 50-000, 02/03/10-8210070007
--B31Q07Q139 Foruards tabulated data on steam generator insp li maint at
facilities Data should be provided to Ijtenseea
[PPCLITQpT Operating Reactors Assessment Branch 33/04/01
VAROA, S Operating Reactors Dranch 1 5pp 19645 131 24X
Fiche 50-000,82/03/10-8310070007
B21007O172 Forwards info re (team generator Integrity !. inspi at all
operating PHRs, per 750320 fc 21 requests Details of insp 5.
including defect indication*, tu-be plugging criteria & tubes
plugged ui 1 1 not be provided eicept for Point Death 1
GOLLER, K R Division of Reactor Licensing (NflR-1975 anlg)
7S/O3/24 MACCARV.R R Division of Technical Review INRR-1975
onli;) 5pp 15645 196 24X Fiche SO-OOO, 82/00/10, 821Q070007
9310010316 Ac k receipt of B20825 Itr informing NflC of steps taken to
correct violations noted in EE Insp Repts 30-250/92-24 &
50-29 1 /B3-24
DANCE. H C Division of Project !< Resident Programs 02/07/13
UHRIO.ff E Florida Power t Light Co lp 1556Q 224 24X
Fiche 90-250, 82/09/13, 0310010316
8310-010321 fleEponds. to NRC B20726 Itr TC violations noted in IE tnap
Repcs 50-250/02-24 t, 5O-251/H2-34 Corrective actions plant
iianager discussed need for increased control af activities
affecting fire barrier penetrations Mi/const penonnel
UHRIG, R Florida Pouer t Liolit Co 93/00/33 O'REILLY, J P
(legion 2. Office of Director 3pp 155oB H25 24X
Fiche 50-250,82/09/13, B2100103l.
B2I0010329 Forwards IE Insp Repts 50-250/82-24 k 50-251/82-24 an
620526-06-25 6 notice of violation
LEWIS, H C Division of Projtcfc !r BesiiTent Proor-ans B2/Q7/3&
OUR 1C. R E Florida Power 6 Llg-ht Co 2pp 1 SSfiB S3B 24X
Fiche 50-250,83/09/13,6210010316
B21001033B Notkce of violation from insp on B20926-062S
LEWIS. R C Division of Project V Resident Programs B3/O7/36
2pp 15548 230 24X Fiche 50-350.02/09/13,8210010316
IE Insp R*pts SO-230/B3-2il t 50-251/93-21 on 820326-0635
Moncomp llance noted inadequate corrective action allowed
recurrence of reportable condition re failure to adhere, ta
radiation uork permit
VOGT-LOWELL, Ft , JULIAN-C Division of Project t, Resident Program
82/07/26 &i>p 19968 232 24X Fichu 30-350, 82/09/13, 3310010314
8209190233- IE Info Notice BO-35, Sup pi 1, "Leating fc Dislodged 1-133
Implant Seeds " Svc list end
COBB.L I Division Of Fuel Facilititi, Materials tt Safeguard I
82/10/06 Consolidated Edison Co of Maw York 66pp 15761 250
24X Fiche 50-000, B2/10/06. B20S190233
Aek receipt of B30?37 1 tr informing NRC of iteps taken to
correct violation! noted in IE In-sp RepU B 0-3 5 0/92-80 t
50~251/8a-2B
LEHIB.R C Division of Project t Resident Progi-aBii B2/IO/08
UHRlO.ff E Flontfa Power k Light Co lp 13776 093 24X
Fien 50-350.
--8210320310 Fopiuards IE Imp fiepti 50-B5O/B2-28 8. 30-351/62-30 on
B2Q&26-0723 (, notice of violation
LE-WrB.R C Division of Project & Resident Programs BH/OB/J6
UHRIQ, R E Florida Power L Light Co 3pp 1577i 096 24X
Fiche SO-250,B2/10/OS,B21022029i
--6210230317 Notice of violation from ln*p on B204.26-0725
Division of Prnjact 8- Resident Programs S3/OB/26 lp
13776 098 24X Ficha 50-230,62/10/09,8210220296
0210220329 IE Insp Ftepts 50-250/S2-SB i 30-251/03-28 on 020636-0735
WoJicompltance notad on 82O7O1 , ground level gates tn Unit fl
RHfl pit stairuisgs. survegsd at dose rates exceeding 1,000.
found op-en & unattended
Vn8T-LQHELL,R , JULIAN, C Division of Project & Resident Pro grim
B2/OB/24 Spp 15776 099 24X Fiche 50-350,82/10/00,0310220394
8310190351 Adviiei that util reviey of current nuclear plant staff
uorting hours indicates that overtime restriction* meet
intent of revised NRC policy Requirements incorporated In
administrative procedures k need not be added to Tech Specs
UHRIO.fi E Florida Pouior 6 Light Co B2/10/1S ElSENHUTiD
Division of Licensing lp 13742 111 24 X Fichu' 50-230, 82/ 10/ I Jl-
0210190331
820819023B IE Bulletin 82-03, "Stress Corrosion Cracking in Thltl-
Uall, Large-Diameter, Stainless Steel, Rec ircu latiun Bgs
Piping at BWR PUnts " Svc Hit encl
DEYOUNOjfl C Director's Office. Office of Inspection and
Enforcement 83/10/14 Consolidated Edison Co of New Vor k
H5pp 15810 125 24X Fiche 30-000, 82/10/ 14, B20819O23B
S Reportac-le occurrences. LEFls & related correspondence
8209210429 Responds to FOIA request for eight categories of LER i
Forwards documents listed in App A
FELTON. J H Division of Rules and Records B3/OB/20 ARNOtD.J
Miami Herald 3pp 14946 262 24X Ficha 50-000,82/08/30,
9209210423
B2092105E9 Forwards draft FR notice re AO pressure transient i during
shutdown at nuclear pouar plant for approval
BIRCKS, W J Office of the Eieeutlve Director for Operation!
B2/07/29 CHILK, S J Office of the Becretarg of the Commission
llpp I494i 353 21X Fiche 50-000. B2/08/30, B20921043S
62102700S3 Mil response to FOIA request for eight caUgorin of 1 bHi
Forujards document* listed In App A App t) documents uithhald
(ref FOTA Eiemptlon 5)
FELTON, J M DIvilion of Rules and Retards B2/09/20 ARNOLD, J
Miami Herald 4pp 1 5636 221 24X Fiche 50-331, 83/09/BO,
B21OB7-0-OQ3
82 1027 00 96 Concurs u/draft Cominlasion paper proposing facility law
temp overpressure event as AO
DENTON.H R Office of Nuclear Reactor Regulation, Director
B1/OE./1& MICHELSOM, C Director's Office 2pp 1 3B36 370 H 1 *
F(ch 50-291, 62/09/20,8210270083
-B310220304 Responds to NHC B2002A Itr- re violations noted in IE Insp
Repts. 30-250/62-28 I. SO-251/8E-Sa Corrective action iccess
log titabllihed to control acceei ta high radiation araa-i
Alarm iiji [nstallad on Unit 3 BHR pft access gat*
UHRtO.R E Florida Power- t. Light Co 0B/0?/27 O'REILLY, J P.
Region S, Office of Director 2pp IS77& 094 34X
Fiche 50-250.62/10/05,32102202^
B20624O11 1 ? Requests approval of AO determination re pressure tr*ntl
while- unit shuttfoun in preparation for startup
DIR-CK.S, W J Office of the Eiecutlve Director for Operation*
SECV-Ba-2&5 62/06/17 lOpp 15B36 272 24 X
Fiche 50-S1,B2/09/20, B2102700B3
8210060209 Foruarifs LER G2-013/03L-0
HILLrAMB. J H Florida Pouer & Light CD B2/10/01 O'UEIU-V.J P
Region 2. Bffic* of Dlnctar lp 15614 043, 24K
Fiche 50-391,92/10/01,821006020?
--82100&O21S LEfi GB-013/03L-Q1, an B20<?Oi,RCS experienced ra-nld dttriati
preiiure Caused bij failed" open presstirl IMT ipraij valve 1
Rgiebor manually trEpped d automatic safety Injection
actuated Pressure control regained using charging pump*
PACE, P L Florid* Pouer b Light Co 92/10/01 Retoft 9, QfMc
of Director, 3pp. 15614044 24X Fiehe 30-251, B2/IO/01.
ea 1006020?
Qai019037i PND-n-82-107-on 921010, unit shut doun for ehdulnl
refueling & malnt for & months, Al 1 three steam generators,
mill be repliced Licensee plans neui releasa.
LAND'S,* D, JULIAN, C ft Region S, Office of Director B3,/ 1 QV I !?
lp I5740'3I5 24X Fiche 50-231. BS/lO/la, B21019037A
DOCKETED ITEMS
47
DOCfET 50-254 QUAD-CITIES STATION. UNIT 1
F Security, medical, emergency >j fire protection plans
&JQ9290I25 F!eleas
publ n
rsion of revised generating station
fnergeiscy plan corporate command c tr emergency plan
inp le-ment ing procedure
.FELTON, J H Division of flules and Records 02/09/16 Document
Jlanajpnont Branch lp 15561 139 SIX Fiche 50-000, 02/09/1 6,
S2Q9290I25
-620 9 2 90189 Forwards public version of Revision 4 to generatiny station
Ej-ergency plan corporate command ctr Emergency Plan
Implementing ProcedurB EOF-3, "Envl ron/Emergenc ij
Coordinator " Receipt fortti end
P/uCLJfaKI, J E Commonwealth Edison Co 02/Q9/01 DEN ION. H n NIW
- llo Detailed Affiliation Oiven lp 15564 123 24X
FichP 50-000, B2/0<7/1A,S209270125
-8209370225 Public version of Revision 4 to generating station
emergency plan corpoiate command ctr emergency plan
Implementing Procedure EOF-3, "Environ/Emergency
(.oord inatar H
PAJOilSKI.J E Commonwealth Edison Co 82/OH/31 llpp
155i4 134 24* Ficne 50-000,82/09/16.0309290125
H21Q010O09 Forwards info to suppl 820701 request for eiemption from App
ft per 020917 telcon Request applies to Sections III G 2 a
t, III C 3 b re installation of fire suppression sijs
ftflUSCH, T J Commonwealth Edison Co 02/O9/23 EI6ENHUT.D
Division of Licensing Bpp 1 5545 152 24X Fiche 5O-000, 82/09/23,
8510010009
G2I0120546 Releases public version of revised cover sheet to facility
FELTCN.J M Division of Rules and Records 02/09/24 Document
tlanasenent Branch lp 13672 219 2-)X Tiche 50-254, 82/09/2-1,
--9210130551 Forwards public version of revision cover sheut to facility
procedures Completion of encl checklist requested
KrtUIVIANrtKIS, N Commonwealth Ellison Co 02/09/15 DENTON.H R
Office of Nuclear Reactor Regulation, Director 6pp 15672 220
24X Fiche 50-254.03/09/2-1,0210120346
B2101504B7 Forwards IE Insp Rnpts 50-254/82-14 ti 30-565/02-16 on
02OB23-25 b 09O3 h 09 No noncomp 1 ianc e notod
i-EPPLER.JG Region 3, Office of Director 02/O9/30 REED. C
Con-no rues 1th Edison Co 3pp 1S721 SS9 24X flchc 50-234,82/09/30,
0310150407
8310190753 Forwards S20922 1 tr re lat submittals of exercise
scenarios l< failure to adhere to FEMA Guidance Memo 17 It
FEMA does not observe eierc lie, of f s its authorities uil 1 1 not
partlc ipate
HIWD.J A Division of Emergency Preparadness b Operational Support
B2/10/I2 REED.C Commonwealth Edison Co 2pp 15736 247 24X
Ftche SO-254, 02/1O/12, 8210190753
8210190760 Discusses concern* re late submittals of emergency eiertic
scenarios t, failure to adhere to FEMA Outdance Memo 17
Future eierciie not meeting intent of advance notification
guidance should be postponed or canceled
BF1EHENY. P J Federal Emergency Management Agency 02/09/23
KEPPLEH.J Region 3, Office of Director lp 19736 249 S-4X
FlchB 50-254,82/10/12.8210190733
8210200361 Heleases public version of reviled emergency plan
implementinD procadurei
FELTON. J M Division of Rulei and Records 82/10/12 Document
Management Branch lp 158S9 20-1 24X Fichu 50-254,82/10/12,
82102B0361
B2102SQ364 Forward! public version of revised emergency plan
implementjnfl procedures, inc lud ing Procedures OEP 200-0 re
emergency i ond i tions, OEP 200-T1 re omeraaniy action levels i
OEP 330-3 re SPINO control terminal operation
KOVACK, T 8 , OERNER.L F Commonuealth Edison Co 82/09/23
DENTON.H R MM - No Detailed Affiliation Oiven 3pp 1S8S9 SOS
24X Fiche 50 -254. 02/10/12. B210280361
3210290375 Public version of reviled emergency plan implementing
procedures, including Procedures QEP 2OO-O re emergency
condition), OEP 200-T1 re emergency action levels i> OEP 330-3
re SPINO control terminal operation
Commonuealth Edison Co Q2/09/23 21pp 15859 2O7 24X
Fiche 50-234,82/10/12,3210250361
8210220358 Provides info re organization & performance of depts
responsible for radiation protection ac tivl ti es, per 02O702
commitment Training coordinator assigned in Apr 1902 to
improve health physics training programs
TRAMK.T R Commonwealth Edison Co 82/10/14 DENTON.H (1 Office
of Nuclear Reactor Regulation, Director 9pp 15776 2H7 3-IX
Fiche 50-000. 02/10/11. 0210220339
8210230309 Respond* to 820917 telcon requDit for Info r fire
protection safe shutdown rept Items 2 & 3 are preliminary
results, SDBJ to revision following engineering review
RAUSCH-T J Commonwealth Edition Co 82/10/18 EIEGNHUT.D
Division of Licensing App 15790 2IS 24X Flche 50-334,82/10/18,
0210250309
--OHIOIEO'195 IE Insp Ropts 50-254/82-1-1 t 50-263/B2-16 on B20823-25 ii
0903 t, 09 No noncompl lance noted Major areas inspected
emergency preparedness eierciae & licensee actions on
previously identified emergency preparedness Items
PMILLIPB.H P . SMITH. M J , AXELSON, W U Division of Emergency
Preparedness & Operational Support 82/09/29 ISpp I 37S 1 293
24K fiche 50-254. B2/09/30, 82101S04Q7
0210130376 Advises that ins tal l.it inn of off site dose calculation nje
program Pullij operational tracking model t operational
A-model will be delayed until 021231 to complete prime
computer Installation
BWftRTZ.E D Cnmmonuealth Edison Co H2/10/06 DENTQN, H R Office
at Nuclear Reactor Regulation, Director 2pp 15602 098 24X
Fiche 30-000, S2/IO/O6. 0210130376
0210570047 Releases public version of revisions to Quad Cities, lion fc
Dresden emergency plan anneies it revised gansrating
station emergency plan telephone directory
F ELTOH. J H Division of Rules and Records 02/10/OS Document
Clanage-nent Branch lp 15877 313 24X Fiche 50-000, 02/10/OB,
S3 10290 04 7
6210290060 Forwards public version of Revision 3 to Quad Cities ti Zion
emersencv plan anneies, fievl s i on 2 to Dresden emergency plan
annei, Revision to Byron emergency, plan annei & revised
generating station emergency plan telephone directory
HOORE, H D Commonwealth Edison Co 82/07/30 DENTON.H R NfiC -
Ho Detailed Affiliation Given 5pp 13877 314 24X
Fiche SO-000, B2/10/OB, H210290047
0210290077 Public version of Revision 3 to Quad Cltiei I, Zlon
emergency plan annetes. Hevis i on 2 to Dresden emergency plan
annei fe Revision to Dyron emergency plan anno
* CommonuiBaUh Edison Co 02/06/30 325pp 15077 319 24X
Fiche 50-000,82/10/00,8210290047,
P Operating license stage documents If correspondents
9210050142 Requests that charcoal adsorber F64-DVM2 be counted uUhln
2 uks of rece Ipt, decay corrected to 770319 lnvels &
raturned Liquid beta analyses results received in NIC
B2Q9I7 Itr will be incorporated in rapt addendum
PAPEfllECLOiC J Division of Emergency Preparednms t> Operational
Support 82/09/2B KALIVIANAK IS, N CommonuiBaUh Edison Co lp.
13603 167 24X Ficho 30-254,82/07/30,8210050142
8210120105 Requests delay of implementation due dates re NURE6-0737.
Items II B 2, "PUnt Shielding," II B 3, "Post-Accidint
Sampling" d II F 1 I. "Noble Qa f Effluent Monitor "
SWARTZ.E D Commc-nurealth Edison Co 02/10/04 EIBENHUT.D
Division of Licensing 5pp 15i51 237 24X Fiche 30-000,83/10/04,
8210120103
8210260326 Forwards Revision 3 of Chapter 9 of "Qffsite Date
Calculation Manual. "
ODLDEN, J C Commonuealtk Edison Co 82/10/06 CASE, E 6 Office at
Nuclear Raactfor Regulation, Director Spp 15805 137 24 K
Fiche' 50-000, 62/10/06,0210260526
8210260542 Revision 3 of Chanter 9 of "DfMlte Dose Calculation
Manual "
tt CofllmOTiuoalth Ediion Co 82/07/30 83pp 15903' 139 E4X
Fiche 30-000,02/10/06,8210260326
82101G0059 Provides addl guidance b clarification r 320806 requeit
far addl Info per NUREO-0737r Item II B 3, "Past-Accident
Sampling S^s " Detailed rellabilltu analysis not required
to satisfy NFIC concerns
CRUTCHFIELD.D Operating Reactors Branch- 5 02/10/08 DELOEOROE, U
CommonujeaHh Ediion Co 3pp 157SO 004 24X Flche: SO-000,
92/10/08, 8910180057
B3102900B8 Public version of revised generating station emeroBney plan
telephone directory
OALLE. D P Commonuealth Edison Co 82/08/12 43pp 13878 218
H4X Fiche 30-000,02/10/00,8210270047
40
DOCKETED ITEMS
8210I907BO Foruardi "CE BUR Eitended Load Lini Limit Analysis for Quad
Cities Nti-clear Payer Station Unit l.Cjcle 7 & Unit 2, Cycle
6 "
RAUSCH, T J Commonwealth Edison Co 03/10/12 EISENHUT.D
Division of Licensing Ip 15736 20-6 24X Ftche 50-254,92/10/13.
B2I01907BO
B2JCOaOt7fl Forwards listing of piping sgs uhich fail to meet fQAH
requirement s, p ir NRC EIQOB18 confirmatory action Itr IE
Bulletin 79-14 oper-abi 1 1 tg evaluation updates will not be
provided for Dresden U Quad Cities Final update bij Dec 1903
fiAUSCH,T J Commonwealth Ednon Co B2/1O/01 KEPPLER.JO Fttjlr
3. Office of Director 6pp 15640 159 24X Fiche 30-000, UJ/lO/Or.
8210QS017B
--S2IO19Q7B'5 "GE BWH Ejtended Load Lin Limit Analgsii for &uad Citiaa
Nuclear Pouer Station, Uni t 1, Cgc Je 7 t. Un 1 1 2, Cgc 1 e & "
* General Electric Co ^600-22192 8S/O7/3I 3lpp 13736 307
24X Fichu 50-254, B2/ 10/12. 621 01907HO
B310190445 Forwards supplemental response to Generic Ltr B2-05 re
implementation status of NUF1E0-0737, I terns II fl 3, II F 1 Z.
II F 1 3. 11 F 1 3 & II F 1 6, in response to BElOOi requeit
SIWRTZ, E D Commonwealth Ednan Co B3/10/14 EISENHUT.D G
Division of Ljcin.ing 5pp 15741 302 24X Fiche 90-000.82/10/14,
82 1 Ol 9044 5
8210250114 Application fat- amend to Licenie DPR-29. chang ing lafety
relief actuating Betpoint of Target Hack valvi to 1,135 psig
t, changing setjioint of tiuo el c tromat i c relief valves to
1.119 pals
RAUBCH, T J Commonwealth Edison Co B3/IC/1B DENTDN. H R Office
of Nuclear Haacfcop Regulation, Director 3pp 13737 032 24X
Fiche 50-254,132/1.0/18.9210250114
Proposed changes to ^BI^ Spen changing *ft(j relief
actuating setpaint of Target Rack valve to 1.135 piig i
iB-tpojnt of tuo ilc tromaHc relief valvci to 1,113 pi fa
* Comtnanuejiltli Edtion Co S3/IOyia 3p p 15797 O35 24X
Fiche 5O-254, 03/10/13,6210350114
3210250155 Foruarfs coTrectfont to propoisd Tech Spec Pagi 1 2/2 2-1 t,
3 3/4 3-S, lup porting revleui of Puturi reloads tt reviled
Figura 351, Sheet I, providing aitendfrd MAPLHGR vi etpaiure
ciiTvci for barrier lead teat assembly Fuel
RAUSCH. T J Cammoni*3lth Edison Co Sa/IO/lB DENTON, H Fl OFFics
of Nuclear Reactor Regulation, Director Spp 1S7QB 233 24X
Ficho 50-
8210080190 Couf irrn* B21 103 enforcement conference at ftp a inn :i n f t rt
aspects diiac latfld u/proc uremen t, instal lati on t uie af
tiDn-qual 1 f 1 ed valve guides in electromagnetic relief valvet
at faciliUaj
SPESSARD. R L Division of Project fc Resident Programs t!3/l(l/iJ<
REED. C Commouwsal th Edison Co Ip 15640 1G1 SIX
Fiche SO-OOO, 62/10/O4, B2IOOB019O
9209190233 IE Info NoUc 80-35. Suppl 1. "Leaking t, Dlalo
Implant Eesds " Svc list end
CdBBpL I Divinan of Fuel Facilities, Materials f, <j a f c
Sa/IO/O6 Consolidated Edison Co of Neui Vorfc (,A[ip
24X Fiche 50-OOO. H2/ I O/06. B200I90233
IE BulLotin B2-03. "Stress Corrosion Cracking in IhUlt
Hal I , Large -Di ampler, Stainless SteeliRecirculation BIJ s
Piping at BWR Plants " Svc list enc 1
DEYOUWO. R C Director's Office, Office of Inspection and
Enforcement O2/10/I4 Consolidated Edison Co of 1 [leu Vorl
115pp 15310 1S9 24K Fiche 50-000, B2/10/ 14, B20B1VQ23B
it Periodic operating rnpnrts 1 related correapondenc
9210130306 Forwards monthly operating repts for Qept 1?02
HALIVIANAKIS, N Commonuiaal th Edison Co 82/10/01 Dlrt-rlor
Office, Office of Inspection and Enforcement Ip IDitlO '1)9 .'*'
Fiche 50-254. H2/IOy01, B2101303B6
Monthly operating repts for Sept 1903
8US9, R D Cummonuaal th Edison Co 82/10/04 I3pp
E4X Fithe 50-254, B3/10/01 , B2I01303B6
BStOESOlA 1 ? ftviid proposed Tech Spec Page* 1 2/B 2-1 & 3 3/4 3-3,
lupporting review of Future reloadi !j revised Figum 3 9 lr
Sheet 1, providing oitindnd HAPLMGR vi eipoture curves for
barrier lead t*t assimlblij fual Supenedes BSODlt variicn
* Comjnonuedlth Ediinn Co 62/10^ 19 4p p 15763 233 24X
Fieh 50-000,82/10/13,8210350138
0510250177 Errata t Addenda Sheet B.rvplating Page 4-10 to "LOCA
Analysis Rept for Dresden l/nita 2 t 3 & duad Cltl< 1 i S
Muclear Pnuer Stations "
General Electric Co rfDO-2414AA EflR 08 03/09/30 3n p
157B8 239 K4X Fithe 30-000, 82/iO/ 1S.B31 0290193,
cm area temp
S2tOZ500&9 Provides addl info re reactor water cleanup rocn
monitors Temp elemanti cause no automatic plant reipans*
Gtgantf contro 1 room alarms
FAl/SCHtT J Commonwealth EdUon Co H2/1O/19 EIBENHUT.D
Division of Licensing 2pp 15737 091 24X Fiche 30-000,82/10/19,
B3/1O230069
Inspection reports, IE BuJUtln* & correspondence
B210I504B7 Forwards IE Imp Repts 50-234/82-14 k 90-269/62-16 on
820023-33 t 0903 d 09, Mo noncomp lianc r noted
KEPPLEfi, J Region 3, Office of Director 82/09/30 REED, C
Commonwealth Edison Co 3pp 15721 389 24 X Flcht 30-254,83/09/30,
G2I01504B7
eaiQ15049S IE Inp Repts BO-334/B2-14 S< 30-3-65/8S-16 on fl20B23-33 S.
O903 (r 09 No- nan<ompltanc e noted. Major areas inspected'
emergency p repar idnis* etirclseii licensee actloni on
prtvidutly identified emergencg preparednect itimi
PHILLIPB, H p , SKITH.H J , AKELSON, M L Division of Eaergencg
Preparedness b Operational Support 82/09/29 ISpp 13721 292
BflX Fiche 50-HS4. 02/09/30, Bai01504H7
8210060399 Ack receipt of 820910 Itr informing HHC of ittpt t*kn to
correct violation noted in IE Insp Arpts 50-337/B1-39,
50-249/81-32, 50-334/81-23. 30-aiS/Bl-33, 90-29B/B1-31 ti
50-304/81-29
8PEBBARD, R L Civilian of Project & Raiidsnt Program*. Ba/IO/01
REED.C. Commonwealth Edidn CD Ip, 1961fl 394 24X
Flehe; &0-000, aa/10/0'1 , H210060-3S9
S Reportable ocEUvrencas, LEHs !i related correspondence
BOUOA0561 DiicuiiB* Facility 770103 loss of air event d effKl nn
tcram capabilltij Consorvati vo analysis of data indlcatai
short opsntor response time Immediate scram on loss of
control rod drivelina air handpr should be required
LANIK.G Director'! Office BO/10/20 M1CHCLSON.C DiniUftr't
Office 3pp 19692 26B 24X Fiche SO-254, BD/10/20,
-BOJ 1060565 Forwards senior rendent inspector BOOBE9 memo rt ff*tl
Of facility 77O1O3 lost of air event li its effect on Itr*
capabi 1 1 ty
HCPPLER, J Region 3. Chicago, Office of the DirocldT (W/u'fl*
M1CHELSCIN, C Director's Office Ip 15692 271 24V
Fiche 50-254,00/10/30,8011060561
B0110&056a Dlicutos facllitg 7701O3 loss of air ovonl t, iff*** f
icrair capabiltty Event indicates that scram discharoe vol,
although Pilled to approi 59X capac i ti), was capable at
accepting vol o-f uatsr to shut doun reactor aafelij
CHRISSOTIHOS.M Region 3, Chicago. Office of the Dinctor
GO/00/E? SPEBBARD, fl L Region 3, Chicago, Reactor tlpiral li.ni
Nuclear Supfnrt Branch 2pp 15692 272 24X
Fiche 50-254, BO/10/HO, 801 1060561
921006.0398 Faruards LER 62-026/03L-0
KALIVIANA^rS, N Camrnonuial th Edlion Co 82/09/37
Region 3, Office of Director Ip 15616 017 2 -IX
Fiche 30-234. fiZ/09/27, 8310060393
S21OO&040S LEfl B2-026/03L-0 on 830906, f Unge seal gaitt Idt >4ll
found nceedlng 30 SCFH Ic possinlij exceadlng Tech Sp*c llnll
of 36 73 SCFH for double-gasket seals Caused bg sei]
gasket detor f orat Ion Qasket to be rBpaired/replaod
HENDEtJHALL.ee Commonweal th Edison Co 82/09/27 HH L Of. 3,
Office of Director Ip 19616018 24X Fiche 90-254,
8210060399.
9210130324 Forward* LER 62-029/01T-0
KALIvIANAKIS, M -CoiMionuealth Ediipn Co B 2/09/20
Ft*glon 3, Office of Director Ip 19678 292 24X
Fith 50-BS4, aa/09/2B,8210l30324
HEPPLEH, J
82100603&7 Retpondt to HRC K0712 Itr r violation* noted in IE In up
Rtptt 50-S37/H1-39-, SO-249/Bl-saf 80-254/81-33, SO-S65/B1-23,
80-H95/BI-31 & SO-304/B1-S9, Corrective ac tiani' training for
ngt prtoritie* re plant aval lability uill b canductad
REED.C Commonusmli Ed i ion Co fla/09/10 KEPPLER,J.fl Region
3, Office op Director lipp 18618.338 24X
Ftcht SO-OOO, BS/10/01, BSiOOA03S9.
3210130323 LER 83-029/011-0 on 82091A, tuo small craclri found IB
affected ion* of welds 12S-F9 & F10 of reactor water cleirvup
lyi piping Causul bij stress corrosion Piping to be replaced
w/stalnleiB itel pip* ti fittings prior to startup
WILOUS,D Conintonuealth Edison Co S2/09/2B Region 3' Qff
of Dlrsctor. 4jp 1367B 293, 24X Fiche 50-254, eS/0?/Mh
8210130324.
DOCKETED ITEMS
49
E?L0130413 Foruards LER B2-027/Q3L-0
fALIYIANftKIS, I! Commonweal tfi Edna
Jlpjion 3, Office of Director I p
Fiche 50-251, B2/OW29, B210I 30413
i Co B2/09/29 KEPPLER, J
I56BO 243 24X
LER S2-027/Q3L-0 on 030902, e lee tromagnettc relief valve main
/alve guides It piston rings inadvertently ordered as
nonsa f e ty-r e lated Caused by inadequate imp lamentation of
T7ETZ.C- Commonwealth Edison Co B2/09/29 Region 3. Office of
Director- Ip 15690 244 24X Fiche 50-254. 82/09/29, B2I01 304 13
0=J|0130501 Forwards LER B2-025/O3L-0
Krtl_IVIAIIftlUS. M Commonwealth Ediann Co 82/09/29 KEPPLER. J
Jlejion 3. Office of Director- Ip 15602 109 SIX
Fiehe 5O-2Sfl. B2/Q9/29, B210I30501
! LEU 92-OP5/03L-0 on B30907, 1/2A standby gas treatment train
heater found tripped dm ing Procedure OOP 020-1 Caused by
conservative suitch setting due to inadequate aetpoint
d i FFetenc. ea Heater trip reset
L1HOU.H Commonwealth Edison Co B2/09/29 Region 3, Office of
Director 3pp 15602 110 24X Fiche IiQ-254, 82/09/29, B21Q1305O1
DOCKET SO-35S PALISADES NUCLEAR PI-ANT
F Security, medical, emergency & fire protection plan*
0310050302 Updates status (< schedule for responses to NUHEQ-0737, Items
t D 3- "Plant Safety parameter Display Coniale" & III A S,
"Improving Licensee Emergency Preparedness - Long-term "
JOHNSON, fi D Consumers Power CO B2/09/3O CHUTCHF1ELD,
Operating Reactors Branch 9 2pp 15402 359 24X
Fiche 30-2S3, 82/09/30, B2I OOS03Q2
821O2BOOSB Releases public version of revised emergency plan
FELTBN* J M Division of doles and Records 02/10/03 Document
Management Branch Ip 15862 124 24X Fiche 50-255,82/10/06,
821Q2BQ058
0210280061 Forwards public version of Revision 1 to emergency plan
* Consumars Power Co 02/09/24 NRC - Mo Detailed Affiliation
Given 3pp 15063 125 24X Fiche 5O-295, 82/10/OB, B310230O3S
8310280063 Public version or Revision 1 tu emergency plan
RAN/, J Consumers Power Cn 92/07/14 lOSpp 15862 137 24X
FichH 50-255.02/10/00.0210230059
2LO13O25I Fc-rcii4rds LER 82-O31/03L-0
KrtLIVIflNAKIS- fJ Cammonuealth Edison Co 82/09/30
Region 3. Office of Director Ip 1 5676 O94 SIX
Fiche 3O-254, B2/09/3O. 821O1.1025J
--11310130253 LEF1 D2-O31/O3L-0 on B20909.f(CIC sus taken out of svc tn
uncouple turbine from pump Caused by need to perform
scheduled turbine overspeed surveillance test
LIHaU, H Cnmmonuie.ilth Edison Co B3/09/3O Region 3. Office of
Director ] p 1S67S 095 24X F]Che SO-35-J. B2/09/30, 02101 302S1
3JtO130J6i Toruards LER 82-032/03L-0
HftLIWlAIJAKIS, N ComUDn'Jeal th Edison Co H2/09/30 KEPPLER. J
Hegion 3. Office of Director Ip I 54O2 136 3<tX
Tiche 50-254. B3/09/30, 0310130466
Q21O3001CI7 Submit* response to NRC questions re util B20701 Pirn
protection submit tal
OQHNSON.n D Consumers Power Co S2/1O/25 CRUTCHF IELO, D
Operating Reactors Branch 5 3pp 15037 191 24X
Fiche SO-35S, 03/10/25, 02102S01O7
G Adjudicabary correspondence
821O1901SO He^ust assntance in representing Oreat Lakes Energy
Alliance in steam generator replacement proceeding Author
de-eply involved in Midland proceeding
SINCLAIR. M draft Lakes Energy Alliance B2/10/04 OAF1DE,
Oovernmenfc AccountadiUtg Project 2pp 15735 323 24X
Fiche 50-255i B2/10/04. 0310I904SO
-S21O13047y LEU B2-032/03L-0 on B20905,HPCr removed from avc la/a
actuation of e I er. tromat i c relief valves Caused by need to
perform scAeduled turbine overspeed surveillance test UPC I
si|E mill be- tasted operable upon return to pouier
LEHOU. H CommonueaUh Etflson Co B2/O9/30 Region 3, Office of
nttector Ip 1S6B2 137 alXritlie 50-234, B3/O9/30. S21013O46b
0210000032 Motion for indefinite contlnuanco of proceeding Need f-nr
steam generator rep lacoment alleviated due to better than
eipected corrasion performance of steam generator tubes
Future rate of corrosion unpredictable W/Certlf Icatc of Svc
STEPTOE.P P Consumer* Power Co STEPTOB, P P Inham, Lincoln fc
Beale 02/10/05 Atomic Safety and Licensing Board Panel App
15640 209 24X Ffcho 90-233,03/10/05,0210000083
Forwards LCD 82-Q30/Q3L-Q
. N Commonwealth Edison Co B2/IO/01
If* g i on 3. Office of Director Ip 15674 100 24X
Fiche 50-234, 92/10/01.0210130193
KEPPLEH, J 6
03100S009? Notice of appearance in proceeding
BTPTOE,P P Conumert Power Co aTEPTO^i P P liham, Lincoln ti
Beale 63/10/05 Ip 15640 375 24X ftche BO-29S. 03/10/05.
0210080099
B3\Ql3QlVt> LEfl B2-030/03L-0 on B20905, lulii IB testing RHFI svc water
pump 1 -IOO1 -65Di pac Hng found burned Caused by eicesslve
tightening in packing to limit leakage Mods installed to
protect bearings from seal leakage
SCHNITZMEVER, J Commonwealth Cdlson CD 02/09/03 fleoion 3.
Officfl of Director 3pp 15674 1O1 24 X Fiche 50-2S4, B2/ 10/01,
Q31O13CH92
62102700B7 Rstpoma to applicant 031003 motion for indefinite
continuance NRC dom nc-t object to motion Certificate of Eve
encl
BABTHiC A Hearino Branch 1 82/10/23 Atomic Safety and
Licensing Board Panel 2pp 13BS2 330 24)1 Fiche 30-235, 02/1O/25,
02102700B7
i2lGl<?065B Forwards LER 02-020/03L-0
hfltlVIrtlMHra. M Commonwealth Edison Co S2/10/04
Rooion 3, Office of Director Ip 15737 267 24X
Fich* 30-254. H2/1Q/Q4, 0210190658
KEPPLER, J
-B210190700 LEB 03 -030/03L-0 on 030930 t 21.RCJC area high temp
isolation 01S-2B.3 switches 1-IJ60-14A, 1-1360-17B t,
l-136O-l6Cr would not trip Cause not specifically determined
Failed switches returned to manufacturer for analysis
PfiEUBS.M Commonwealtti Edison Co 82/10/04 Region 3, Offitt
of Director 3pp 15737 26B 24X Flcha 50-254,83/10/04,
62 1 01 906 59
21O2S0148 Forwards supplemental UER a2-022/Q3L-l
HALIVIANAKIS, N Commonwealth Edicon Co 82/10/07
flegjon 3. Office of Director Ip 15787 360 24X
Fiche 50-254, B2/IO/07. 0210250140
KEPPLGR, J
P Operating license stage documents ti correspondence
8310120033 Ack receipt of 820030 application proposing Tech Spec
changes re ESF filtration sgt Application provide*
luppltmintal Info to 7B0306 pre-fee application No add! ft*
required Refund of B3QB30 application fee authoTliid
MILLER, M B LJctnie Fee Hanaoem*nt Branch 83/09/23
VANDEUALLE. D J Consumers Pouer Co, Ip 15689' 203 24X
Fiche 50-393,82/09/23,0310120033
821005007H Discu*s 020209 final assessment rept for 0EP Topic IX-4,
"Boron Addition 8v " CJiict valvm 3408,3409 & 3410 tfioultf
bt added to T*ch Spec Table 4 3 1 RuponiB requested uithin
45 diyi
CRUrCHFIELD, D, Operating fllactorl Brinch 5 92/09/89
VANDEMALLE.D J Consumers ROUST Co 2pp 1S603 1S6 24K
Fiche 30-255,62/09/29,9210030073
-0310250153 Supplemental LEF1 B2-022/03L-I on 820816,maint outage for
1/3B dleiel fire pump eiceeded 7-day limit Cause not stated
Diesal pump luear rings replaced
LIHOU, H Cammanuealth Etjison Co 83/10/07 Region 3, Office of
Director Ip 157B7 361 24X Fiehe 30-254,02/10/07.0210250148
3210070013 Forwards draft "Offilte Da Calculation Manual" for
facilities
VANDEWALLE, D J. Consumer* Pouer Co 83/09/2? CRUTCHF1ELD.
Operating Rtuctort Branch 5 Ip 13*28 223 B4X
FichB'9O-000, 62/09/39,8310070013
3IO204c.7 PMO-III-02-1I2 utll notified that high density fuel storage
racfc* installed do not meet design criteria for spacing due
to bowing condition Manufacturer reanalyzed seismic response
of racks & concluded bowed distance acceptable
GRDBE.J . HrtLKER.R , 8THEETER. J Region 3, Office of Director
S2/10/1B Ip 13806 237 24X Fiche SO-H54, B2/10/18, 8210260467
0210070018 Drift "Offilte Dos* CulcuUtion Manual," Pulisaifai Plant
Consumer* Pouier Co 82/09/24 SSpp 15628 276 24X
Fiche- SO-000, 82/09/29. 8B10O700O
DOCKETED ITEMS
821C03Q265 Confirm* that auiiHarij feeduaUr >g mod provides for pumpt,
P-8A & P-BC to be loaded on emtroentv Jieiel generators upon
Ion of off si t power
JQHNSON.B D Con.uinr* Pouiir Co B2/09/30 CRUKHFIELD, D
Operating R.acton Branch 5 lp 19610 233 24X
Fiche 50-255,82/09/30,3310050265
gaiOOSOSOa Uadt*i -status t schedule for responses to NUREQ-0737, Items
I D 2, ' J Plant Safety Parameter Display Console" tc III A S.
"Improving l-icenm Emergency preparednesi - Lang-Term "
JDHNSQN f 9 D Consumers Paiuar Co 03/09730 CHUTCKF1ELD. D
Operating R-aeton Branch 5 2pp 15602 359 24X
Fiche 90-255, S2/07/30.B210Q50302
B21O13007B Submiti Info ft failure of control rod to fully insert
during teiting in hot shutdown condition Locking pau & pin<
piiton guido tube, rack aisemblij * oivel gear homing
replaced All defective uncoupling tools ramovid From ivc
JOHNSON!, B D Consumers Pnuer Co B2/10/06 CRl>TCHFIELD, D
Op era tins Reactors Branch 9 4pp 15451 B4fi 24X
Fiche 30-253, 82/10/06, aai01E007B
9210200276 Inform* of neuj commitment datei for MJREC-0737. Itemi
II F 1 I. II F 1 B, II F I 3, II F 164 II D 3
JOHNSON, E D Consumers Power Co 92/10/35 CRUTCHFIELD, D
Operating Reactor* Brand! 5 3pp 15937 304 24X
Flcne 90-2SS, aa/IO/35, 32(0290276
Inspection report*, IE Bulletins f. c orresp
B2100B0015 Addl response to FQIA renueft for 19 categories of info r
nuclear reactor events S- safety problems Forwards document!
listed In App A Documents in ftpp B completely withheld {ref
FOIA Eemption 5)
FELTQN.J M Division oF Rules and Records 02/07/12 UOELLrR A
Critical Haas Energy Project 9pp I56i5 037 24X
Fiche 90-000, Q2/07/ia,B2100a0015
H21QOH0144 Systematic aiieRsmerit af licensee performance notei rt
l*eilltg evaluation for 79090 1 -BQ090 1
NRC - No Detailed Affiliation Given 80/09/01 iQpp
11669 015 24X Fich" 50-000, Q3/O7/ 13, D2100BQ015
82101203B3 Foruard* *uppl ta safety avaluation of BEP Topics II-3 A,
II-3 B h 11-3 C reanaJyiirto design basis urg level for
fjcility Unrctolvrif diffifences nou camidereil acceptably
riio-lVBit t< topic ravieiui Complete
HAMBACH.T V Operatino Beactori Branch. 5 B2/1Q/07
VAMDEHALLE. D J Con^umerl Pouer Co, 5pp 15653 033 24X
Fiche 30-255, 62/10/07,8210)20323
9210070007 Repond to FQIA request for eight categories of record*
iteam genirators It steam turbines App A documents provided
in R Udell F01A Rquest BI-313 Forwards documents listed In
App D
FELtON. J M Divimion of Ftitles and Records Ba/OB/IO LOHO, J
Uinthropj Stinnon, Putnam (. Roberts 9pp 15645 063 24X
Fiche 50-000, B2/OB/10,H210070007
S3lOt3O32i Comment* on proposed nopi of Phase III of SEP at reflected
in individual topic definition! appended to B2090? Itr
Staff incourdgacl to develop i. implemenl; means to incorporate
poitive attribute* of Phase III in I ictniee/NRC interface
KACJCH, R M SEP Qunnr-i Oroup aa/lO/O? EISEHUT-D Division nf
Litensinu 7pp 15603 179 24X Fiehi 50-000,62/10/07,9310130326
82101S0110 Frovldvi add! guidance re purpose of HF1C B20630 reiuest
for aildl info concarnins NUREO-O73S, I tm 11. B 3 re
poit~*cc1dent iiffipling <vs
CRUTCHFIELD, D OperJtina Rticton Branch 3 63/10/07
VA.NDEUALLE, D J Corumei-s Power Co 3pp 13719 319 341C
Flcln:50-255, 82/10/07,8210160110
B210070172 Foruiards inPo re steam generator integi-ity (. intps at all
operating PWRs. per 7S0320 * 21 requests Details of intps,
including defect Indication!- tube plugging criteria b tubes
plugged uill not be provided eicept For Point Beach 1
ODLLER.K R Division oP Reactor Licensing (NRR-1975 onlif)
75/03/24 MACCARY.n R Division of Technical Kevieu INFtn-1975
only) 5pp 19645 196 24X FichB 50-000,02/09/10,3310070007
8210190421 Forwards IE Imp Rept 5Q-255/B2-30 during Auo 1983 t r.alJti
of violation
STflEETERfJ F Division of Project (. Resident Proorami
DEWITT, n D Consumers Pouer Co 2pp 13741 034 24X
Fiihe 30-2S5. B2/O7/39, B2IO190421
G210130334 Foruardt evaluation* o-f open Itirat identified In NRC 830213
Itr re BEP Topic 1 1 1-7 B, "Design CoistrDai ior Criteria b
Load Combination*'" per utll 320917 Commitmsnt Code change
uitll not affect i*fetij margin of plant structures
WNDEMAULE, J Consooiers Power Co FJ2/10/OB CRUTCHFIELD, D
aper&tlng Riactart Branch 3 \Sff- 1S679 140 24X
FichB 30-295,02/10/08,6210130334
B210170459 Forwards current status of program to- evaluate Jnuacy af
overload Si short-circuit protection tor elactrlcal circuit!
that pats through reactsr containment per BEP Topic VIII-4
"Electrical Penetrations of Reactor Containment "
TONER, K, A Coniunun Powir Co 82/10/12 CRUTCHFIELD, fr Operating
Reactor* Branch 5 21pp 19740 ttbB 24X Piche 30-000, B3/10/1S,
S3 10190499
921019&35 FoTUtrdi lummBri) af (ctioni taken to uddrei* specific 820412
draft KUREO-OaaO cane errs re eccintric loads tk valve
functional) i 11 t<j in mall bore piping Summary of plant to
perform addl analysts e-n control valve GV-3003 enck
TONER, K. A Consumer! Pouer Co B2/10/13 CRUTCHFIELD, D Oparatlng
Reactors Branch 9 91pp 197&1 299 84 X Fichu 30-293,62/10/13,
G2101909HS
asiOW054i. Summ*riie sttu ol utll commitment re 8EP Topic IX-3,
"Station Svc ti Cooling Mater fiijf " Analysii verifying that
component coaling water- tajnp limits are not erceeifeif undir
postulated condition* uill bi lubnitteil bg 821113
TQHEfl.K A Coniumen Pou*r Co B2/10/15 CRUTCKFIELD.D Operating
Seactcri Branch 9 2pp. 19791. 3el, 24X Fiche 30-299, fla/IO/ 13,
B2HH 90946
B310S20IB6 Provlil*s- aJdl info re control roan totlc ch*micl i
self-contained breathing ppr*tu in reiponie to NUREO-
0737> Item III.D 3 4 on contol roon tiabltabi Uti/i pr 820730
1-to.uei t
JOHNSON, B D. Coniumeri Power Co. 82/10/IV, CRUTCHFIELD, D,
Operatinj React on Branch 3. ?pp, 13777.354. 34 X
Fichl 50-258,02/10/1?, a210220iaf>
-8210190437 Notice of violation from insp during Auo 1103
BTREETEH. J F Division of Project fc Resident Programi
lp 13741 036 24X Fi the 50-359.03/09/39,0210190421
-0210190449 IE Imp ftept 50-2SS/B2-20 during Aug 1903 Moneomp L i*nci
not<d,an B30B31iDBA 0ei(.uencer Test Procedure T-I57 rivlted
during implementation b new steps involving bijpast of safety
functions performed ui/a permlsilon of shift supervisor
JOROENSEN-B L . HELLER. J K , REYES, U A Division of Project I
Resident Program* 82/09/29 7pp 19741 037 B4K
Fiche BO-2S9. 02/09/29,0210190421
Q210190699 Foruards IE Mgt Meeting Hept 30-B55/03-2I on DHO^Ofl fJo
noncomplince noted
KEPPLER.d Region 3, Office it Director 02/10/04 DEHITT-Ft I
Consumers Pouer Co 3pp 19737 276, 24X Ticha 30-233,1)3/10/04,
0310190699
8210190707 IE Mgt Meeting Rept 30-833/02-21 on 020900 Mo noneonjll
noted Kajor areas discussed current tt'tui of util program
for meeting rtquiramen ts of 010309 confirmatory order rt
regulatory improvement program
JuRQENSEN.D L.. BPEBSARD, R, L Dtvitton of Project i, Hi<I*rl
Progrnns 02/10/01 i3pp 19737 270 24X IMche 50-BB9.0a/ Itlf.
8210190699.
3208190233 IE Info Notice 00-39, Sup pi 1, "Leaving t< Dltlodgid [-1
Implant Btldt, " Svc lUt end,
COBS, L, I Di vilion of Fuel Facilities, Materials fc Bafeguirtf*
82/10/06 ContolUatad Edison Co of Neui York 46pf 13761
34X F i the- BQ-000, 02/10/06,02081 90233
620019023B IE Bulletin B2-Q3i "Strets Corrosion Cracking In Thiil-
Mall, Large~Dim*ter< Stalnlest Steeli Recireulitlon Silt
Piping at BHR Plant)., " 8vc list me 1
DEYQUNO.R C Director'* Office, Office of Inspection and
Enforcement, BB/10/14. Caniolidated Edison Co of HIM VQV-!
llSpp 19910:129, 24X Fiche, 90-000, 82/10/14, 0208190330
9210260179 Respond* to- 820817 re^ueit for removal of adffiinUtrakive
limit on auxiliary feeduiater flam rate to ittm ganerator.
Limit* iflicirsifif in KRC 801001 t<nmeillati action Itr no
longer appropriate New flou ratis ihouH be eitablithed.
KePPLER.O.O Region 3, Office Of Director. B2/10/20, JOHNSON, B D
Contumen Pauer Co, lp. 15799:036 B4X Fiche: 30-233, BS/10/20i
B210260I7&- Act receipt of supplemental 02092? Itr in farm! rig NflC ftf
ittpi ta.ken to correct Violations noted in IE Intp Rpt
SO-2SB/92-07
NaREL.il/9iC , Dlviiion of Engineering & Technical Projfuti,
02/10/18, DEWITTiR.B Consumtri Power Co. lp, 19799 (MS 31
FichB' 80-299, B2/10/18. 0210360176.
DOCKETED ITEMS
61
821O26Q103 Suppls response bo K"C B30412 Itr re violations noted in
IE Imp Kept 5O-29S/62-07 Coi rective actions NQS-traceab le
hydrometer received t, compared in/by drometers used far
lurve I 1 1 arc e Calibr results end
JOHMSaN, B D Consumers Power Co 03/09/29 KEPPLER, J Region
3. Office of Director 2pp 15799 O46 24X Fiche 50-255,
02/10/60.6210360176
Periodic operating reports
> ipondance
'210S3013B Forwards monthlij operating rept for Sept 1902
KENNEDY. D M Consumers Power Co B2/10/OS NRC - No Detailed
Affiliation Given fp 15673 090 24X Fiche 30-355,82/10/09,
-B21QI30145 Monthly operating rept For Sept 1983
PETERSON.!) A . VANDEflflERG. D Consumers Power Co 82/10/04 4pp
15-673 091 24X Fiche 50-255, B2/1O/08, 821 0130138
Heportable occurrences, LERs V related correspondence
1210130146 Forwards LEU 81-01 1/03L-Q
HOFFMAN, D P Consumers Pouer CD SI/03/37
Chicago. Office of the Director 101/03/01)
Fiche 50-255. Bl /O3/27, B3101 5O146
KEPPLER, J Region 3,
Ip 15697 083 SIX
-B31OI50153 LER 81-O11/03L-0 on BI0304. d lese 1 generator 1-1 overspend t
low air pressure alarms actuated t, mould not reset after 16
cylinder leak test Caused by broken micro-switch due to
high impact resulting From improper use of trip lever
* Consumers Pouer Co 91/03/27 Region 3< Chicago, Office of
the Director (B1/Q3/OU Ip 15697 OB4 24X
Fiche 50-255.81/03/27,6210130146
8210190404 Forward* LER 02-033/Q3L-0
JQHN90N.B t> Consumers Pouer Co 02/1Q/11 KEPPLER, J Q HBBI" 3.
Office of flirector Ip 15739 357 24X Flch* 50-1355,82/10/11.
B210I9Q604
6310190615 LER a2-02a/O3L~0 on 9309(5. b on c acid heat trace circuit 4O1
(gravity feed lini to charging pumasl failed Hndundant
channel remained operable Couied by failed heater element
Heater element replaced
Consumers Power Co 82/IO/H Region 3, Office of Director
Ip 13739 359 24X Fiche. 50-253, BE/ IS/ 1 I, 0210190604
8210190620 Forward! LER B2-039/03L-0
JQHNSON.B Consumers Pouer Co 93/10/11 KEPPLEJ1, J Q Rsnion 3,
Office of Director 1|> 15737 219 24X Fiche 50-353, B2/10/ 1 1<
8210190620
B21019062B LER B2-029/03L-Q on e2O9I6,T-82D {lafatu injection tank III
level reached Tecfi Spec limit of 199 inch" three time* in
34- h period Cain id bi; minor leakage p*it loop check valve &
fill & drain valve Fill & (Train cycled tn itop leakage
* Consumers Power Co 82/10/11 Region 3' Office of Director
Ip 13737 220 24X Fich* 30-255, B2/1O/1 1 , 921Q190620
8210190639 Foruiardi LER S3-030/03L~0
JOHNSON. D D Coniumers Poiuer Co, 83/1O/11 KCPPLEf?. J O Rosinn 3,
Office of Director Ip 15-740 044 24X Fiche 30-235,83/10/11.
0210190639
62101 90 1 4V LR 82-030/03L-0 on &3Q127, boric acid lieat trace circuit 133
failed Redundant ehanntl remained operable Caused tij blown
fuse in controller Circuitry tested 1 & Pua e replaced
* Consumer* Paiutr Ce B2/IQ/11 Region 3j Office -of Director
Ip (3740 045 24X Ftche 50-253.82/10/11,8310190637
21OO7O415 Discueaes abnormal uear encountered on ALOVCO suing chock
valves initalled in lou pressure safety Injection 5iji IE
stiDuld istue info notice to inform licensees of problem
MICHELSON.C Director's Office 91/12/23 OEVQUNO, R C Director'a
Oiflte, OfFice of Inspection and Enforcement 5pp 15637 3S7 24X
Fich* 50-255,81/13/33,82100701115
55001COOQ Responds to FOIrt request for 19 categories of documents re
nuclear reactor events (< safety problems Forwards documents
1 11 ted in App A
FEt-TOM, J H Division of Rules and Records 02/O6/28 UDELL. R, A
Critical Mass Energy Project ISpp 1S727 005 24X
Fiche SO-O'OO, 82/06/2B, 9210Q10QQB
-B201200&53 Hecommenda issuance of info notice to inform licensees of
problems u/AUOVCD suing check vatvet as encountered at
facility Abnormal uear reported in LER B 1-037
rllCHELSDH.C Director's Office B1/1S/23 DEVOUNC.fi C
Director's Office, Office of Inspection and Enforcement 5pp,
IS732 076 24X Fiche 50-000, B3/06/2B, B21001000B
210040213 Forwards LEfl 0a-026/03L-0
JQHMBOM, D Consumers Power Co 02/09/39 KEPPLER, J Region 3,
Office of Director Ip 15613 097 34X Fiche 50-255.02/09/39,
B31OO&02I3
-0310040216 LER 82-026/03L-0 on B20901 . determined that four fire doors
mfg by Protective Matls Co not documented to confirm testing
& approval bij nationally recogniied lab Caused by vendor
failure to obtain certification following mods
CaniuJneri Pouier Co B2/09/29 Region 3, Office of Director
Ip 13413 09B 24X Fiche 50-253.02/09/29,0210060213
21O13O146 Forwards LER B2-027/03L-0
JOHN50M, D J> Consumers Power Co 02/09/30 KEPPLER, J Region 3,
Office of Director Ip 15673 OB4 24X Fiche, 50-2B3, 82/09/30.
9310130146
-8210130i56 LER 82-027/03L-0 on 020901 . procedural inadeo.uac i es
diEcovered uihich could cause reduction in degree of
redundancy In containment cooling lys Procedures revised
to require fjns to be declared Inoperable If stopped
* Consumers Pouer Co 82/09/30 Region 3, Offie* of Director
Ip 1S673 005 24X Fiche 50-255, B2/09/30r B2J0130116
JIO18O1B6 Furuards LER 82-031/03L-0
JOHHSON.B D Con.umrs Power Co, S2/10/06 HEPPLER, J Region 3.
Office of Director Ip 1371B 177 24X Fiche SO-B33, BB/JO/06,
DOCKET SO-399 BRQUM8 FERRY NUCLEAR POUER STATION, UNIT 1
F Security, medical, emergency & fire protection plans
8209170101 Foruiardl minor revision* to proposed physical security plan
Revision* withheld tret IQCFH73 21)
MILLS, L H Tennesiee Valley Authority. 32/03/31 DENTON, H H
Office of Nuclear Reactor Regulation. Director, 3pp 14910 OBI
24X Fiche 50-2S9i 02/00/31,8209170101
0310210034 STATION BLACKOUT AT DROWNS FERRY UNIT PNE>IOttINE AMD NOBLE
GAS DISTRIBUTION AND RELEASE
WICHNER.R P , WEBER, C F. . LOfiENZ.R A Oak Ridge National Laboratory
FIN B-0452 NUHEO/CH-31B2 VOa B3/OW3Q Division of Accident
Evaluation S61pp. (3773,001 34X FJche 50-259,03/09/3-0,
03 102 10034
8210330336 Forwards security plan table of contents Table of contents
ulthheld (ref 10CFR73 21)
HAMMER, D 8 Tennesiee Vill*u Authority 03/10/19 DENTOM, H. R
Office of Nuclear Reactor Regulation! Director Ip L5?ea 363 21X
Fiche, 50-299, 02/10/19, 0310350336
Adjudicator!/ correspondence
8210120391 Response to ASLAD 02O930 orilor to provide any supp lemsntal
info re questions posJ to util Authoriiat [on i* for S-gr
storage of lou level raduaita. la/v limit on use of module*
for interim use on backup bails.
RAW8QN, R,J Hearing Branch 4 82/10/03 Spp 13659 071 24X
Fiche, S0-S39i Sa/10/OBi B2101SO271.
0210120299 Affldivit of P Logien re afplication for storage of lou
level radwast* No restriction rei(URsta<l or contempla ted
limiting use of modules anlv to interim use an backup basis
LOYSEN.P Advanced Fuel itBpent Fuel Licensing Branch aS/IO/OQ
aapp 15692.079 34X Fiche , 50-289, 82/10/03, 82101S0291.
B21012030B Affidavit of JR McOrath Ttmilg re<nrst Por ren*ual of
facility license filed far Bs-atlif'NV lou level raduiait*
dlspaial facilltu HV State Board of Health voted not to
reneu facility licence,
HCORATHiJ.R Auittant Director fop State Ajrim*nti
ea/10/OB 2pp !SiB3. 10H 24X Flche.flO-K
-8B10IB0191 LER 82-031/03L-0 on 030909,1-1 diesel generator water jacket
h*ttr found inaperable Caused by corrosion of heater
elsment. Heater replaced u/slmllar typt element Mod developed
to replace heater element
Consumers Power Co 82/10/06 Region 3. Office at Director
Ip 15718 173 24X Fiche SO-2S3, 82/10/06. B2101801B6
0210120316 Affidavit of 8N Salomon South*t IneT-tt*te Lou Lvel
Raduaste Kg t Compact agreed to -clove BarnuialliBC Facility
on 921231 & open new fite on 91 1331. Certificate af Bvc encl.
SALOMONiB. N Ailistant Director for State Agraments Pro-aram*.
B2/10/OB 4pp. 13632 104 21X Fiche: 80-2*9, 08/10/00,0210150391
DOCKETED ITEMS
B210230Q63 Telecopy mesiige of juation far ASLA& to grant 30-day
intention to rsipond to ASLB B30920 order Tim* netesiary to
eiplore settlement possibilities of til matters in
controversy
PYLE, B PIJ|, R B 02/10/30 Docketing i. Services Branch If)
157B7 Ofil 24X Ficfie 50-259,32/10/30,8210250063
62-10260429 Motion for eite-nsion of time until B21121 to respond to
B2092Q order Time nee-iisarg to explore poii 1 b i 1 itiai of
settlement Certificate of Sve end
PVLE, R B Fylij R B S3 /JO/20 Atomic Safety and Liceniirig
Appeal Panel 2pp 15906 036 21 X Fichs 50-259.62/10/20,
82102A0429
K Utility Final Sifatu Analysis Report (FSARt fc amende
0308170297 Chapter 2 to Browns Ferry updated FSAJJ, "Bit* "
* Tennessee Valley Authority B2/08/I2 346p,p 1-4852 302
Ffche 50-359, 92/OB/13, B20B170S97
P Operating license stage documents ti correspondence
B210Q5026S Apol icat Inn to Amend License DPH-33. revlsins Cycle 5 mai
criticaE pouer ratio values Error discovered In active fuel
length used in original Cycle S analvils Approval ronuesled
by 821119
MILLS, L H Tennessee Valley Authority B3/09/31 DENTON, H 19
Office at Nuclear Reactor Regulation. Director 2pp 15&11 331
24X Fiche 30259, 92/09721 . 0210Q5Q2&B
82100601 IB Si) itema tic assessment of licensee performance notn n
facility evaluation for Apr I97<?~Mar 1980
* NRC - No Detailed Affiliation Owen SO/03/31 App
15667 3IS 34X Fiche 50-000.92/07/12,0210080015
8210150105 Notifies that corrective actions re IE Insp RepU
50-259/BI-13. 5O-36-Q/81-13 ! 50-296/BI - 13 delayed Procedure
BPH NBQE3 re eiam of CSSQ items to be reviled by 820915
&0R.J A Tennessee Valley Authority B2/07/13 8 'fiElLLf, J P
Rejton 2. Office of Director lp 15701 159 24X
Flche 30-239. 82/07/13,8310150105
Bai0220t'51 Provide* iupplamental rssponso to NFIC Itr re violattani
noted in IE Insp Repts 50-239/82-10,50-360/83-10 ',
50-296/92-10 Div nf procedures Manual NB2A3 luill not be
rvid until B2100I due- to scope of effort involved
HIULB.L M Tennesiae Valleij Authority 83/OB/1B O'REILLY, JP
Beoion 2, Office of Director lp 1 577H 104 24X
Flche SQ-35 1 ?. 32/OB/IB, B21022015I
B210O10035 Confirms 920909 iite meeting to dH
r* raduai-te shipments Agenda encl
O'REILLY. J P Region 2, Office of Director
Tennessee Valley Authority 2pp 15565 16'
Flche 50-259. 82/09/03. aaiOOlOOSS
02/09/03
24X
82IOO10430 Faruards IE Insp Repts 50-359/82-25. 50-2tO/a2-a'> t,
50-396/62-35 on 820910-11 Nn noncomp 1 i anco noted
VEfiRELLl.D M Division of Project f> Resident Programs 03/09/01
PAHRIS, H C Tennessee Valleij Authority 2pp 15570 211 J4*
Fiche 5O-259. aa/09/03, 8210O10130
32100&0271 PropolBd Tech Specs re mai critical fnouier ratio
Tennessee vallecj Authority B2/OW31 3pp 15611 233 24X
FicJie 50-2S?.B2/09/21,B2I005oa4Q
82100&D301 Application to amend License DPR-33. updating curve of
preai-ure v temp to extend applicability thro'iigh 5
effective full pouer ijri Approval of changt re^uestid by
Q21126
MILLS, L H Tennessee Valley Authority B3/09/23 DEHTOH. H n
Office of Nuclear Reactor Regulation. Director 2pp 1S419 2fJ
24X FlchB 50-259,82/09/23,8310060301
Proposed Tech Spec Figure 3 6-1. updating curve of pressure
vs temp to attend applicability through 5 effective full
v rennente Valley Authority 82/09/33
Ftche 50-259.65/09/23,9310060301
3pp
6210070259 Forward's response to NRC request for dddl Info on
NUHEO-061S, "Control of Heavy Loads of Nu-Elear Power
Plants "
MILLS, L M Tennessee Valley Authority B3/09/29 VASaALLO. D D
Operating Reactors Branch 2 Sopp 19635 343 21 X
Ftchu 30-2B9, B2/0?/29, 02I0070S5S
62100002 IS Forward* addl info in response to NRC 820800 request re
NUREO-0737. Item II K 3 24, "Adei^uaci) of Space Cooling far
HPC1 * RCIC, "
MILLfliL H Tennesiea Valley Authority 82/10/04 DEN TON, H R
Office of Nuclear Reactor Regulation, Director 3pp 15639' 091
S4X Fiche- 50-259, B2/10/04i 82100G031B
9210130142 Foruards description of final modi & changes to BUR tcram
ays t hort-term Interim tturniltnuntt for Unit S Mods uili
bi imp leminteK for Unit Z before startup from Reload 4
outa-ge lc subsequent Units 1 & 3 outages
HILLS, L M Tvnneiiee Valley Auth&i-ltij BE/lO/Oi DENTOH, H. ft
Office af Mu clear Reactor Regul'tloni Director 4pp 13673 OB6,
B4X Flche 50-259.82/10/06,8210130142
821.0250096 Foruardi revision to BE 1 006 implementing procedure*
HILLS, L K Tetinvstee Valley Authority. 82/10/15 DEN TOM, H R
Office of Nuclear Reactor Regulation, Director- lp 13793:098
Ficht' 90-S97, 82/10/15,0210290096
S-tX
--B210250101 F1evii*d Imp Unending procedurei.
Tnnse Vill eg ftutharlty &3/10/15
Flche SD~S
lipp 1B793, 059
021001O-432 IE Insp Repti 50-259/83-35,50-360/02-25 fc S&-a?4/8?-a en
020010-11 No noncompl iance noted Major areas Inspected
reactor secondary containment integrity problem ti MBIV
testing
BROPK9, E M , JrtPE. F Division of Engineering 6 Technical I'mjiam
82/08/27 4pp 15570 213 24X Fiche 50-239,02/09/01,02101110*^
9310150399 Foruai-ds IE Imp Repts SO-259/B2-2G, 50-360/9B-PO !.
50-29A/82-2B on G2OB30-0903 No noncomp 1 lane e noted
VERRELLI.B 11 Division of Project t, ResidEnt Programs
PARRIS.H Tannesaee Valley Authority 2np 1 57Ofl 029
Fithe 50-259. 82/O9/2Q, B210150399
8210130406 IE Inp ftepts. 90-259/92-26,50-260/02-20 (, 50-aV6/(ja-3H ti
80030-09Q3 No noncomp 1 iance noted Major areas inspected
insrvic Imp program t inservire testing program review
GIFtARD.E H , BLAKE. J Division of Engineering t. Technical
Programs 9H/D7/1& 4pp 1 5704 031 24X Fiche 30-359, OS/09'2' 1
32I01S0397
0210010097 Approves revised cammltmont dates for Item 23 af App I to
IE [n*ii Rents 30-259/91-19,30-260/01-19 & 50-296/B1-I? !.
Item C 2 af App A to IE Insp Depts 50-259/03-12, 50-26O/Q2-IS
t 50-29A/82-12
LEUIB. R C Division of Project (. ftesident Programs 02/09/33
PARRIS.H Tennessee Valley Authority lp 15563 GO I 34X
Flche 50-259. 82/07/33,0210010097
B2100IO1Q4 Dequestt citension to respond to App C. Item 23 tn [E Imp
Repts 90-25'?/'81~19, 30-260/81-19 & 50-396/81-19 t. Item C 2 In
IE Imp Rpti 50-2B9/B2-12, 50-260/82-12 t. 50-296/82-12
Responses ui.ll be submitted by B30I01 & 021101, respec tlvilu
MILLS, L H. Tennessee Valley Authority 82/09/O1 P'REILLV. ,1 P
Region S, Office of Director lp 15565 O02 24X
Flche 50-2B?, BS/09/22. 0210010097
821001032& Forwards lummiry of 82 09 OB enforcement meeting u/uU 1 la
ditcuit corrective actions re leakage during shipment of lou
level uaste li utll plena for improving employee training
D'RErLLY, JP Region 2, Office of Director B2/09/22 PAIJfllB.HI!
Tennessee Val IBIJ Authority 4pp 1556? 188 24X
Fiche:BO-a3J. 82/09/22,9210010326
8210OL029O Ach reciipt of supplemental BS0901 Itr Informing NFIC or
steps taken to correct Violation D noted In IE Insp ftvpti
BO-259/B1-26, 50-260/62-26 & SO-296/91-2i
LEMIB.K C Division of Project b Resident Programs
PAftfUSj H Tannaisee Valley Authority lp 15S73 103
Flche. 30-289, 83/09/24,0210010290
Q, Inspection report*, IE Bulletins & correipondanc*
8210080015 rtd-dl reiponsa to FOIA r*nut*t for 19 categories of info re
nuclear reactor events & safety problems, Foryards document*
lilted in App A Dociimints in App B completely ulthhtld (ref
FOIA Exemption 9).
PEL TON, J H Civilian of Ruin and Aecordl 82/07/12. UDELL, IT A
Critical Hass Energy Project 9pji, ISiiB 037 24X
Fichf 30-000, 32/07/12. QS100B0019
B210010304 Foruiards reviiad response to NRC 8H02B Itr re vloUtle>l
noted {n IE Insp Kept* 50-259/82-26, 50-260/02-26 t,
90-296/82-2& Corrective actions R factor returned to within
limits fc revision to Tech Spec approved
MILLS, L,M Ttnnessee valley Authority 82/09/01 0'REILC.V. J F
Region S, Office of Director 3pp 15573- 1B4 4X
flcfie 50-259. B2/09/H4, B210010290
DOCKETED ITEMS
53
a21030390 Foruarrfs IE Insp Repts 50-359/B2-29. 50-360/82-29 fc
SQ-lfb/BS-S 1 } on B20906-10 No none omp 1 lance noted
WERfiELUl.D 11 Division of Project t. Resident Pragrams B2/09/30
PAFRIS.M G Tennessee Valley Authority 3pp I 377? 220 2-1X
FuJie 50-259.02/09/30,8210350390
210130565 Forward* LER 8a-O69/03L-Q
GREEN. H J Tennessee Valley Authority 82/10/03 O'REILLY, J P
Region 2, Office of Director Ip 1 5683 110 2flX
Fichu 50-357, B2/10/05. 8310130565
--E21G220'1Ol IE Insp Rupts 50-259/82-29,50-260/82-29 t, 50-276/B2-29 on
E2O9O6-1O fJo noncomp 1 lance noted Major areas Inspected Unit
3 refueling I maint outage & procedural compliance of
health pjiys i c s-re lated practices bij workers
COLLKJS.T R , BARR.K P Division of Engineering t Technical
Program* 82/09/27 5pp 15779 223 24X Flche 50-259.83/09/30,
8210220390
-8210130569 LER B2-069/03L-0 on 830907, during startup testing, rod
sequence control sys found Inoperable Caused by failure of
QE sequence generator card Model 193B948QAA Card replaced Si
testing sat isfac torllg completed
IRDY, D J Tennessee Valley Authority 82/10/05 Region 2.
Office of Director 2pp 136B3 111 24X Fiche SO-239, B2/ 10/03.
0210130569
2LOOB0219 Forwards revised request for relief from Inservice Insn 7 re
inati e&sib le uelds in piping penetrations te under rigid pipe
restraints Dest effort visual eiam will be performed during
su.5 hij d i os tat ic pressure test
MILLS, L H Tennessee Valley Authority 02/lO/Ofl DEN TON. H R
Office of Nuclear Reactor Regulation, Director 3pp 15638 OB3
24-f Fiche 50-259, B2/1O/04. B2IOOBO219
B3QB190233 IE Info Notice BO-3S, Buppl 1, "Leaving J- Dislodged 1-135
Jnplant Seeds " Svc list end
CQDB.L I Division of Fuel Facilities, Materials & Safeguards
BS/30/O6 Consolidated Edison Co of New York AApp 157M 2M>
24* Ficha EO-OQO, B3/10/06 B2O8170233
S3IO150218 Formal ds update of present uiork (c schedule for
implementation of insps required under IE Bulletins 79-02 t
79-14 Phase II evaluation mill not be completed until
H40B01
HILLS, L M Tennessee Valley Authority 92/10/O7 O'REILLY. J P
Region S. Office of Director 2pp 15703 276 21X
Fiche 30-259, 82/ 10/07. B31015021 B
0209190239 IE Bulletin 8S-Q3, "Stress Corrosion Cracking in Thick-
Hal 1, Large-Di ameter, Stain 1 ess Steel . Rec in u la tl on Sys
Piping at BUR Plants " Svc list end
DEMJUNC.R C Director's Office. Office of Inspection and
Enforcement B2/1O/14 Consolidated Edison Co of New Vork
l!5pp 15BIO 125 24X Fiche 50-000. B2/1O/ 1 ), 830B19O23B
5 fleportable occurrences, LERs fc related correspondence
C-210120129 Advises of need For in-depth evaluation of potential for
unaccep Labla interaction octiueen control rod drive sijs &
nonessential control air sys Margin of safety Inherent In
licen^ncf design basis should be promptly restored
rflCHELSOM.C Director's Office BO/OH/18 DENTQN, H fl Office of
HucIoaT Heaclor Regulation, Director 3pp 15692 190 24X
Fiche SO-296, GO/OB/IB. 8210120129
8210130165 Foruards LEfl 82-072/03L-0
OREEH- H J Tennessee Valley Authority 82/10/07 O'REILLY,J P
Region 2, Office of Director Ip 1 S673 054 24 X
Flihe 50-259, S2/IO/O7. B210130165
8210130169 LER 82-072/O3L-Q on B20908, during startup, rod worth
mini ml I er (RUN) applied rod blocks uihen rod 30- 5 1 selected
Caused by lilting tuo rods twice in RUM sequence due to
typing error RUM sequence corrected i returned to svc
NAVE, E Tennsisoe Valley Authority 82/10/07 Region S.
of Director 2pp 15673 O55 24X FUhe 50-359,62/10/07,
8210130165
821O13017B Forwards LER 92-075/011-0
OREEIJ. H J Ttnnenee Valley Authority 82/10/07 O'HEILLV.
Region 2, Office of Director Ip 19673 046 34X
Fiche 50-259,83/10/07,8210130172
-8210130176 LER 82-075/OIT-O on 820924, four degraded voltage relays,
three timers t one 1 oss-of-vo I tags relay found to be outside
allowable Tech Spec setpoint range Caused by setpolnt drift
Relays recalibr t returned to svc
CHRISTOPHER, N Tennessee Valley Authority 83/10/07 Region 2,
Office of Director 2pp 15673 047 3flX Flche 50-SS?, B2/ 1O/O7.
S210130172
B21O130429 Forwards LER 8a-070/03L-0
GREEN, H J Termenee Valley Authority S2/10/07 0'REILLV,
Region 2, Office of Director Ip 15681 160 24X
Flche 50-359r 82/10/07,8310130429
B210I3043B LER B2-070/03L-0 on 82090B, whl le ealitir reactor protection
*ys high-water live! stuitchet on tcram discharge tanki level
switch LS-B5-4SE operated at 37 ga 1 Ions, c ontrary to Tech
Specs Caused by callbr drift on level switch EL-305-EI-X
IRBY, J Tennessee Valley Authority B2/1O/07 Region B.
Office of Director 3(io 15681 161 34X Flche 50-399.62/10/07.
821013042?
520*300170 roruards LER 83-071/01T-0
SHEtHiH J Tennessee Valley Authority B2/09/24 O'REILLY, J P
Region 2, Office of Director Ip 13553 231 24X
Fiche 50-359.83/09/24,8209300170
--8^09300175 LER 82-O71/01T-0 on B20909.HPCI condensate storage tank
lou level switches LB-73-56A 4 LS-73-36D failed to operate
Caused by dirty b corroded level switches activating plates
Plate points cleaned
IFIHY. If J Tennessea Valley Authority 82/09/24 Region 2,
Office of Director 2p p 13553 282 21X Flche 50-259,83/09/24,
6209300170
8310220053 Forwards LER 8a-073/Q3L~0
OREEH. H J Tennessee Valley Authority 82/10/08 O'flEILLY, J P
Region 2. Office of Director Ip 13778 204 24X
Fiche 90-257, 83/10/08,8210230033
B2102S0057 LER 82-073/03L-0 on 820910. while performino malnt on dlesol
generator Ar fuel oil flowed out discharge filter drain vatve
when transfer pumps Hipp lied oil to day tank Caused by
personnel error Responsible person relnstructad
PORTER, M R Tennessee Vallau Authority 82/10/08 Region S,
Office of Director Ip I977B 205 2-1X Fiche 50-259, 82/1 0/OB,
8210320053
321-0060409 Forwards LER B2-067/03L.-0
GREEN. H J Tennessee Valley Authority 02/09/30 O'REILLY, J P
(legion a, Office of Director Ip 13615 319 24X
Fiche 5O-339, B2/09/30.B21 0060409
8310060113 LER 82-O67/O3L-0 on 82O901 . during normal operatl on. uih i IB
performing fire protection surveillance imp, heat detection
lone A for spreader room A common to Units 1 8, a found
Inoperable Caused by loose fire protection panel relay
rtURPMV. E Tennessee Valley Authority 82/09^30 Region 'A
flffUe of Director 2pp 15615 320 24X Fiche 50-239r 92/09/30,
B3 1 006040?
8210290054 Forward* followup LER S2-023/03X-2
OREEJ4, H Tennessee Villiy Authority 82/10/13 O'REILLY! J P
Rsjlon 2, Office of Director Ip 13B54 050 24X
Fiche 50-357,82/10/13,8210290034
B210290057 Follouup LER B2-OH3/03X-3 on 820327. recircu lation pump 1A
tripped due to spurious generator starter relay operation
Caused by Hi-ttmp relay trip Relay reset in 20 minutes &
pump return sd to *vc No recurrence control planned
CHRISTOPHER, W Tennessee Valley Authority 82/10/13 Region a,
Office of Director 3pp 13854 051 24X Fieh* 50-259,83/10/13.
SKI 0290031
Forwards LER B3-06B/03L-0
J Tennessee Valley Authority B2/09/30 O'RCILLY. J P
Rejion S- Office of Director Ip 15615 004 24X
Fiche 30-259,82/09/30,8210060414
8210290062 Forwards updated LER B2-042/03X-1
GREEN, H J Tenneiaea Valley Authority 82/10/13 O'REILLY, J P
Riglon 2, Qfflet of Director Ip 13853 339 24X
Flchf 30-257, 82/10/13, B310390042
8210060122 LER B3-06S/03L-0 on 820902, whi 1 e performing primary
containment Isolation valve leak rate text. A hydrogen
analuier became inoperable Caused by failed hydrogen sample
Inlet pump power relay contacts
CARTER, B D Tennessee Valley Authority 82/09/30 Region 2,
Office of Director 3pp 15613 005 24X Fiche 50-259i Bfl/09/aOi
S2COO&0414
B310290064, Updated LER B2-043/03X-1 on BHOkiB, quarterl Surveillance
Insp 3 S B for testing of HPCI (< RCIC vacuum relief valves
not performed ptr ASXE Section XI Caused by personnel error
Foreman misplaced performance reminder
CAMPBELL, 0, Tennessee Valley Authority 83/1O/13 Region 2-
Off*e of Director 2p 15833 340 2-)X Flche 50-239,82/10/13,
82I029006S
54
DOCKETED ITEMS
9210290317 Forward* updated LEH B2-031/03X-2
GREEW. H J Tennessee Valley Authority 83/10/13 O'REILLV. J P
Region 2, Office af Director lp 1 5853 OGO 24X
Flche 50-259, B2/IO/13,B310290317
--B2IQ29035I Updated LER B2-031/03X-2 on 820510, hydroOBn analijiBr B
Inoperable du to failure of hydrogen sample Itilet pump
Caused hij failurt of Allen Bradley rtl*1 Model 700-fjaOOAI
contacts Relau Investigation results eipetted 93O31S
CARTER, S Tennessee Valley Authority 83/10/13 Region 3.
Office of Director 2p p 15853 OBI 24X Flche 50-239,62/10/13.
0210290317
8210290369 Foruardi LER B2-077/03L-0
CflEEN.H J Tennessee Valley Authority B2/10/J5
fiejion 3. Otfio nf Director lp 15653 OS3 2
Ficfie 50-259,82/10/15,6210290368'
O'KEILLV, J P
--B210290371 LER 92-077/03L-0 on 820918, control rod 3B-39 declared
inoperable due to fuse failure alarms A high-water level
alarm indicating Caused by control rot drive hydraulic
control unit accumulator level switch ising grounded
Ml/HPHY,D E Tenne!ee Valley Authority B3/IO/1S Region 2.
Office of Director 2pji I5B53 084 24X Fichu 50-SS9, S2/ IO/1S.
9210260381 Forwards LEfi 02-076/03L-0
SREEM, H J Tennessee ValJe Authority Ba/10/l<? O'SEILLY.J P
Region 3, Office of Director If 13803 35? 24X
Fiche 50-257,82/10/19,9310260391
0210E604Q7 LER 82-O76/03L-0 on B2IW25, turb ine bids roof vr>t mrnilKor-
CAM 1-90-251 became Inoperable Caused by failure of ptimp
drive motor, model 6K56-2C due to end of natural Jife Drive
motor replaced,
THORPE, A A Tennessee Vallu Authority BB/1O/I Region S,
Office of Director 2p 13803360 24 X Ficlie SO-259, B2/I O/ 19,
B2102i036l
6210260212 Forward* updated LER 62-Ofi7/03X-l
flHEEN.H J Tnns*ee Va 1 1 eu Authority 83/10/20 O'REILLY, J P
Rlgion 2, Qffica of Director lp 15799 153 23X
Fiche 50-259, 82/ 10/20, 9210260218
8310360222 Updated LER 82-067/03X-1 on 820?Dl,heat detection i one For
(.prefer room A & pnactmn cprlnkler automatic initiation
circuit Found fnoperabie Caused ti) lODle fir* prntection
panel relay Relay reposltioned t clipped in place
MURPHY, D E T(nn(B*>e Valley Authority B2/IO/20 Region a,
Office of Director 2pj 13799 134 24X Flche 50-H&9. Q2/ 10/50.
B210SA0212
Adjudicator!; (orre'spondenc e
82101202?! Rfiponse to ASLAO 020920 order to provide flnij sup
info re quettion-i posed to util Author i lati on IE for 5-ijr
for Interim me on backup bails
RAUSCH, R J Hearing Branch 4 B2/10/OS Bpp 15653 071
Ficne SO-259, B2/1O/OB, 82101 20291 _
821012029'? Affidavit of P Loysen re application For sloragi! of lev
level raduaita No- restriction requested or concempla tetf
llmltinj use of modules only to interim use on dacltup basil
LOVSEN.P Advanced Fuel 5 Spent Fuel Licensing RraniN BJ/IC/
2-3pp IS6S2 O77 24K Fiche 30-259, B2/IO/OB.
B21012Q30B Affidavit of JR McGrath Timely request for renewal l
facility license filed for DeatlpjiNV low level radujas It
disposal facility Nt' State Board of Health voted not to
reneui facility license
MCORATH, J R Assistant Director for State Agreement.! Pronjriss
02/10/08 Spp 13652 102 24X Fiche 5O-259, 02/10/00. n2IOU'O.NI
62J012031A Affidavit of SN Salomon Southeast Interstate Leu Livtl
Raduaste tig t Compact agreed to close Darnuell.SC Facility
on <?3l23l f* open n>u tite on 911231 Certificate of Svc enc]
SALOMON. 5 H Assistant Director for State Agreements I'ragroni
62/10/08 flpp 15452 104 24X Fiche 5O-259, 02/10/OH, OJIOK'02 ,1
5210250043 Telecopy iressage of motion for ASLAB to grant 'BQ-d.iy
eitenaion to reipond to ASL3 S2O920 Older Time necessary to
eiplore settlement pou its 1 1 1 ties of all matters in
controversy
PYLE, R D Pyle. R D S2/IO/2O Docketing t Servic&s Dranih If
157B7 Oil 24X Fiche 5O-259, B2/10/20. 02102S0063
Sai02i>0fl29 Motion for attention of time until B3I131 to respond to
030920 -orifer Time necessary to eiplore possibilities of
settlement Certificate of Svc encl
PVL,R D Pyle, R Q 62/1O/20 Atomic Safetij and Llcmilna
Appeal Panel 2pp I5BO6 O36 24 X Fichu 50-259, 02/10/39.
B210Z60429
Operating license itage documents b correspondence
B210070255 ForuarifB response to HfiC request for addl info on
NUF1EO-0612, "Control of Keavif Loads of Nuclear Pouier
Plants "
MILLS, L fl Tenneisee Valley Authority B2/09/3B VABSrtJ-LlJ, B
Operating Agactors Branch 2 Sipp 1S635 243 24X
Fich* 50-239, B2/09/2B, 821 0070355
T Hear-In! tranicr-ipt* on non-antl trust mattert
B210070133 Testimony of JW Hutton answering ASLAD quesittons on lou
level raduaite fflgt nptlont Availaollltu of adequate spat*
to dispose of loui level uiastes in neit 5yri uncertain
Certifteate of Svc encl
HUTTOM.J M Tennessee Valley Authority S2/IO/OI ISpp,
15627 03J 24X Flche 50-H59i 63/10/01 , B210070133
DOCKET 30-2*0 DROWNS FERRY NUCLEAR POWER STATION, UNIT 2
F, Security, ntdlcal, emergency & fire protection plnt
8209170101 Forward! minor revisions to propanil phgilcdl securitg plan
Rsvilioni uithhtld (ref 10CFH73 21)
HILLS, L H r*nnetie Vall* v Authority B2/OS/3I DEWTON, H R
aftict of Nuclear Reactor Rejulatiorii Director, 2pp 14910 OBI
2JX Fie he- 30-259. eff/OB/31 , S209170101,
plan table af contents Tabl* of content!
8210230234 Foruards iBcurit
withheld Cr*f 10CFR73 2U
KAMMER.D B Tennee Valley Autha
Office of Nuclear Reactor Regulation
Fich* 80-239. B2/10/19, 8210250236
ti) 6S/10/I9
Dine tor lp
DENTON,H H
13739 363
9JIOOS021B Foruards adtfl info in response to NRC B2080B requtfit ri
WBEG-0737* Item II K 3 24, "Adequacy of Space Cooling for
HPC1 fc RCIC "
MILLB.L H Tenn*iee Valley Authority S3 /1 0/04 DENFON.K H
Office of Nuclear Reactor Regulation. Director 2pp IS&IO <1V]
3W Fiche 50-259, 02/10/04,9210090216
6210130143 Foruards rfo'scrip t ion of filial mods b changes to BHH *
-tys S short-term Interim conrnl tmentf for Unit 2 Moid uilll
be jmplefflBnted for Unit 3 before startup from Reload 4
outage & subsequent Unit* 1 b 3 outages
HILLS, L H Tonnesie* ValJey Authority B2/10/06 DEN TON, 1 1 II
Dfflco of Nuclear Reactor Regulation, Director 4pp 15673 Olifi
24X Flene 50-259,62/10/04.0210130142
82102S0067 Application to amen* License DPR-52 to accomodate Relnid
Cycle 5 operation & outag*~rela ted mods Approval by B3QII.2
requeited to avoid impacting refueling & startup
MILLS, L.M Tenneisae Valle<i Authority S2/10/15 DENTDH, H P
Office of Hue 1 tar flae tor Regulation, Director 2pg 15792 149
24X Fich* SO-2-&0, BS/IO/19, B2102S0067
8310250070 Proposa-o 1 Tech Spot c hangei, aecomodacinj Reload 4,Cycli
operation It o<ut*ga~r*tate<[ mods
* Tenne**fe Vallvy Authority 82/10/15 B2pp 13792 147 ?
FitdeiBO-SiO, 02/10/15,8210250067
Ba 10 23024 4 Forward* revisions to physical security plan Revisions
ulthhaU (ref 10CFR73, 21)
HAMMER, S Tenntisee Valley AJtfioritg BS/lQ/f) DENTON, H A
Office of Nuclear Reactor Regulation, Dine tor lp, 13769 349 24X
Flche. 50-290, B2/10/I9, BS10aSOS44
-8310350074 "Supplemental "eloarf Licensing Bubmittal for n. r c-wn
Nuclear Plant, Cycle 5, Unit 2j Reload 4 "
HILF,C.L , I^RBIE, W, A , CHURNLEY, J 3 deneral Electric Co
VIOOSSOlAflO 92/07X31 3fipp 15792 23O 24X
FUhi SO-260, 82/10'/IS, 8210250067
BZ102S0077 Errt* . Addentfa Sheet 4 to NEDD-240BB-1, "LOCA
for Brown i Ferry Nuclear Plaint, Unit 2 "
* General EKctric Co NEOD-240Ba-l NO 4 ERR 82/07/31
15792,895, 24 X Flche 50-2&0, B2/IO/15, B21 0230067
Bf(i
DOCKETED ITEMS
--a2lQ22007B Errata t, Addenda Sheet 5 to NEDO-240BB-1 . "LQCA Analy;
r'oi Droons Ferry Nuclear Plant. Unit 2 "
" General Electric Co NEDO-^OBB-l N05 ERR B2/OB/31 3pp
15792 263 24X Ficne 50-260,62/10/15,0210930067
P2I025GQ96 Forward* revision to 821006 implementing procedures
hILLS.L M Tennessee Valley Authority 83/10/15 DENTON, K R
Office of Nuclear Reactor Regulation, Directoi lp 15773 058
Fifhe 50-259, S2/1Q/I 5. B21O250Q96
15793 059 24X
- B2 102501 Ol Revised implementing procedures
Tennessee Valley Authority B2/IO/IS lpp
Fithe 50-239 82/10/15.9210350096
Inspection reports. [E Bulletins d correspondence
A-ddi response to F01A request for 19 categories of info r
nuclear reactor events I/ safety problems Forwards documents
listed in App A Documents in App B completely withheld (ref
FC11A Eiemption 51
FELT01I, J M Division of Rules and Recntds 02/07/12 UDELL. H A
Critical Mass Energy Project 9pp 15669 O27 24X
Fiche 50-OOO, 82/07/12. B2100SOO1 9
-B2lOQ9Olia Systematic assessment of licensee performance note
facility evaluation for Apr 1979-Mar 1900
- NRC - Ha Detailed Affiliation Given BO/03/31 6pp
15667 315 24X Fiche 50-000. 83/07/ 1,2, B21 006001 5
Notifies that corrective actions re IE Insp Oepts
5O-2S9/al-l3 50-240/BI-13 1 50-296/B1-13 delayed Procedure
DPI1 I-BCE3 re eiam of CSSG items to be revised hy 82O915
DP-ER. J A Tennessee Va I ley Authoi i ty B2/07/13 O'REILLY, J P
Region 3. Office of Director lp 15701 159 24X
Fiche 50-259. B2/07/13. 8^10150105
F,?lQ-33Q151 Provides supplemental response to HRC lir re violaliano
noted in !E Insp Repts SO-2S9/B2-10, 50-260/B2-10 &
50-296/62-10 Div of procedures Manual NB2A3 will not be
revised until 831001 ifue to scope of effort involved
MLLS, L n Tennessee Valley Authority S3/OB/1B Q'REILLY.J P
Rpjion 2 Office of Duet lor lp 15778 106 34X
Fiche 50-259. B2/OB/1B, B21022OI 5 1
&;iGQtQO35 Confirms B20908 tite meeting to discuss recent violations
re raduaste shipments Agenda end
O'HEIULV J P Region 2. Office of Director as/Ot/03 PARR IB. H U
Tennessee <. J alltt} Authority 2p p 19565 l&ii SIX
Fiche 50-259.82/09/03,0210010035
E121001Q430 Forwards IE Insp Hepts 50-259/02-25, 5O-260/EJ2-25 8-
50-296/62-35 on B30B10-11 No none onp I 1 nnco noted
VFRREUL I . D 11 Division of Project fc Resident Programs 82/09/03
fViRBIS. ll<J Tennessee Valley AUthoi lly 2pp 15570 211 SIX
full* SO-25 1 ?, 62/09/03, Q2100I0430
S2100J0326 Foruiards (ummarij of B2090B enforcement meetlnj u/uti 1 to
ducuu corrective actions re leakage during shipment of loiu
level uaste It util plans for Improving employee training
O'REILLV.J P Region 2, Office of Director B2/09/22 PARR IS. H IS
Tannefsie Valley Authority 4pp 15569 IBB 24 X
Ficha 50-259, 82/09/22, H2IODI0326
B21DOl02?0 Ack receipt of lupplemental B20901 1 tr informing NRC of
steps taken to correct Violation D noted in IE Inep Repti
50-359/61-26, SO-260/B2-36 l< 50-396/BI-26
LEWIS, R C Division of Project & Resident Programs 83/09/24
PARR'S, H G Tennessee Valley Authority lp 15373 1S3 E4X
Fiche 30-259, 32/09/34,6210010290
--B2I0010301 Forwards revise* reiponte to NRC B1I03B Itr re Violation H
noted in IE Imp Rapts 30-239/62-26, 50-26 O/B2-26 b
5O-296/B2-26 Corrective actions fl factor returned to uilthin
limits & revision to Tech Spec approved
MILLS.L H Tennessee Valley Authority B2/09/OI D'HEILLY-J P
Region 2, Office of Director 3pp 15373 184 24X
Fiche 90-299, B2/09/24, BS10O10290
9210220390 Forward! IE Imp Repts 50-259/83-29,90-260/82-29 i
50-296/93-2? on 830906-10 No noncompl ianc* noted
VERRELLI.D H Division of Project t Resident Programs B2/09/30
PARR IS, H Q Tenneisee Ville v Authority 2pp 15779 230 SIX
Fiche 50-3S7r B2/09/30,H2I0220390
3210220401 IE Insp Repts SO-259/82-S9, 50-E60/B2-29 & 50-296/82-29 on
320906-10 No noncomp 1 lance noted Major areas impacted Unit
3 refueling d fflaint outage & procedural compliance of
health phyi Ics-re lated practices by uiorfcen
COLLINS, T R , BARR.K P Division o# Engineering & Technical
Pronfams B2/09/27 Spp 1577? 222 24X Fiche 50-25<?r 82/O9/JO,
B210220390
82100B0219 Forwards revised request for relief from Inservice Insp / re
inaccessible welds in piping penetrations (< under rigid pipe
restraints Best effort visual eiam mill fae performed during
sijs hydrostatic pressure test
MILLS, L M Tennessee Valley Authority B2/10/04 DENTQM, H R
Office of Nuclear Reactor Regulation, Director 3pp I963B OB3
24X Fiche 50-359,83/10/04,8210000219
8208190233 IE Info Notice 80-35, Buppl 1, "Leaking !t Dislodged I-1S5
Implant Seeds " Svc lilt encl
COSO.L I Division of Fuel Facilities, Materials & Safeguards
82/10/06 Consolidated Edison Co of Neol York 66pp 19761 2 SO
24X Fiche 50-000, 83/10/06, BSOB190233
8210150318 Forwards update of present work tt schedule for
implementation of irtsps required under IE Bulletin* 79-O2 &
79-14 Phase II evaluation mill not be completed until
B40B01
MILLS- L,H Tenneisee Valley Authority 82/10/07 O'REtLLV, J P
Region 2, Office of Director 2pp 19705 276 24X
FichB 80-359, B3/10/07,B21Q19021S
-Sai0010432 IE Insp Repts M>~?59/B2-2b, SO-2iO/B2-25 t. 90-296/82-25 an
SZ0910-1I No noncomp 1 iance nateif Major areas inspected
reactor secondary containment integrity problem * ME5IV
*ei t ing
DRCO^SrE H . JAPE. F Division of Engineering !< Technical Pniftrams
82/OS/27 4pp 15970 213 24X Tlche 50-359,82/09/03,8210010430
S30B190238 IE Bulletin B2-03, "Stress Corrosion Cracking in Thick-
Nail, Large-Diameter, Stainless Stol, Reclrculation Syi
Pipitifl at BWR Plants " Svc Hit end,
DEYOUNO,R c Director's Offic*- Office of Inspection and
Enforcement S2/10/I4 Consolidated Edison Co of N*w Vork
113pp 19BIO 125 34X Fiihe SO-000, B2/10/ 14. aaOB19023B
U21015O399 Foruard* IE Insp Repts 90-B59/B2-3B, 50-260/B2-29 &
50-296/03-23 on B20S30-0903 Ho noncomp 1 lane e noted
VERRELLEiD H Division of Project d Resident Programi 82/09/KO
PrtRHIS, H O TennHssea Valley Authority 2pp 15704 029 24X
Fiche 50-259, 82/09/20, 62101 50399
--9210I5O40i IE Insp Repts &0-359/82-2B, 50-260/B3-2B t. 50-396/83-26 on
E20B30-0903 Ho noncomp 1 lance noted Major areas inspected
inserviiE Insp program * inservice testing program revieu
OIRARD,E H , BLAKE. J Division of Engineering t Technical
Prograns 82/09/16 4pp 1 S704 031 21X Fiche 50-399.32/09/20,
E21 01 50399
9310O10097 Approve* reviseil commitment dates for Item 29 of App C to
IE tnsp Hents 50-259/61-19,50-260/81-19 i 50-296/B1-I9 fr
Item C 3 of Aft & to ^ Insp Repts SO-259/B2-13, 50-260/B2-12
> t SO-29A/B2-12
LEWIBrR C Division of Project * Resident Programs B2/09/2H
PARSES. H O Tennessee Valley Authority lp 15565 001 24X
Fiche 50-259,82/09/22,8210010097
8210OIOIO4 Rq,ue*ts eitension to respond to App G,Item 25 in IE Jnsp
Rpta 50-259/81-19,50-260/81-19 (, 50-296/B1-19 & Item C S in
IE Insp Heptt 50-259/82-12, 50-260/S2- 12 (< 50-S96/B2-13
Responses uill b> submitted by B30101 & 821 I01i respec tively
KILLS, L ri Tennessee Valley Authority 82/09/01 O'REILLYrJ P
Region 2, Office of Director lp 19565 002 34X
Fiche 50-2S9. B2/09/22. 8210010097
S Reportable accurrencesi LERs d related correspondence
B2I01S0129 Advise* of nd far in-depth evaluation of potential for
unacc>ptaol > ' I nterac tion bettueen control rod drive sys &
nnnessentlal control air syt Margin et safety inherent In
licensed design basis should be promptly restored
MICHELSON.C Director's Office BO/OB/IB DEN TON. H R pfficu of
Nuclear Reactor Regulation, Director 3pp 15692 150 C4X
Fiche 90-296, BO/OB/IB. B310120129
8310070490 Discusses 810406 deliberate pump trip Control switch n
manipulated for tuo trains of circulating water ii/s
resulting In pump trip FBI & util Investigations failed to
find culprit Ev*nt listed In safeguards watch list
LAWINGiU D. Director'* Office 8I/0&/34 Director's Office.
lp 15644 39B 34X Flch- 50-260, Sl/Oi/24, 8310070490
821001000B Responds to FBIA request for 19 categories of documents re
nuclear reactor evtnts h safety problems Koruards documents
listed in App A,
FELTON-J, M Division of Rules and Records, B2/06/2B UDELL, R, A
Critical Mass Energy Project 15pp 15727.005 24 X
Fiche- 50-000, BS/06/ae- 0210010000
DOCKETED ITEMS
BlO71ib007 i ; Informs that manipulation of control switches for tun
of circulating uater sys re-suited in trippinn of tun
circulating mater pumps locatid in intake structure PD 1
Investigated fc Found no evi-dsr.ce of uho operated switches
LWJNINOiW D Dlroctor's Office B1/Q6/34 nireclor'i Offic
If 15727 250 24X Flche 50-000.62/06/28,0310010009
9510360349 Forward* LEH S2-OP9V03L-0
GREEN. H J Tennessea Vatleij Authority 62/1Q/19 a'flEILLV, J P
FleoiQn 2, Dfflc* of Director !p 1 5903 347 34X
Fiche SO-260. Ba/lO/! 1 ?, a21Q3i<X]49
--B310360353 LEfi B2-039/03L-0 on B20951 , plnh o 1 a leak discovered in 3-
fire protection line- supplying Uator to cable-trail fined
water spray sijs CJntaed 6y through-uaH pitting corrosion
attack UUvasonit testing to be done bij 030201
KECKEtSEN.T TenninSBB Valley Authority 92/10/19 Region B,
Office of Birector 3fp 15602 346 24X Fltha 30-360,02/10/19,
B210-260349
Hfl Hobinson rchmc*l
321O06O334 "Radiation Shielding Analysis F
Support Ctr /Emergency Operating Facility
DRCDE.H U , IJATHrtN, S J . SCH1IDT, E R NUS Corp NUS-4L54
B3/06/30 54pp 15,|i? 134 24XFictic 50-261, Q3/1O/O4, B21 CXV..9 J
H Goneral corresp ondent B
Requests IJRC direct all offi
utll vice-prei ident. due to B30930 ret
JOKES. J A CaroJina Power *< Liglt CD
Office of Nuclear Reactor Regulation,
Fithe SO-OOO, a3/'09/27, S21OOIO03S
ial correspondence ID LK J
rement a^ JA Jones
03/01/27 DEtJrOM.H R
Director Ip 15!)(,3 314
B210l3032^ Requeats changea to distribution list For DUJIEQ-OOJO.
"LicensciJ Operating Reactors - Status Summary Ropl "
Zll1HERriAN,S R Carolina POUBT '- Ligfit Co B2/1O/11 MtrE-M f>
A DP Sy-ate-ms Development Rianch 2pp 1 5683 361 24X
FichB 50-000,32/10/111.6210130323
92102*0417 Foruardt LEO B2-03a/03L-0
OREEW-H J Tenncssea Va ! 1 eij Authority Q2/10/17 0'REILLV,J P
Region 2, Office of Director Ip 1 SB06 150 24X
Fithe 30-3AO. B2/10/S9, 3210260-117
--B21&2604-16 LEFI 82-03Q/O^L-0 on 320921 , duping refuel 1 ng, turb i ne to
reactor lililg doors 237 t, 23B opened t Imul taneoua I<J . brea I Ing
tecondary c onta i nmen t Caused bu Folger rtdams Interlock lys
failure due to loose door latch screw]
TAVLOR. D Tennes9ee Valley Authority 02/10/19 Region 2.
Office of Director 2p-p 13Q06 131 24 X Fiche 50-2&O, B2/ 10/ 17.
9310260417
T Hearing transcripts on non-ant L tros t matteri
B210070133 Testimony of JW Hutton answering ASLftD questions
level raduiaite itgt options Availability of adequate space
to dispose of law level w.istos in neit S yr i uncertain
Certificate n f Svc end
HUTTOlhJ u TanneMoff Va H c-ij Authority 62/10/01 12pp
15627 031 24K Fiche 50-337. B2/10/0-1 . Q510O70133
DOCKET SO-3&1 H D RQ3INBDM PLANT, UNIT a
F Security, medical, aner^encij t< fire protection plan
82 10250202 Foruarils itenflTia for S2101-1 small-scale omorg encij
prrparedneaj eierclae
ZJKnERMfiN.S R Carolina Pouier t Light Co 02/07/OH STOHR, J P
Division of Emergency rre-pareilntis d Dpsrational Support Spp
1378Q S72 21X FichH SO-Sfil. H2/09/OE. B31O2S0203
6310150396 Fo-l-uaril* IE Inspi Rep t 50-2t,l /BZ-S'i on 830014-19 No
none amp] 1 a nee noted
LEWIS, R C Division of Prajucl t, Reildont Fragrant BH/0 1 ?/!?
JQHfQ, J A CaToltna Pouer !, Light Co app 1S701 033 2-H
FUhB 30~2il, B3/09/I7, B21015Q396
--9310150101 IE InBp Rept 30-2M/B3-29 on B30016-19 No noncnniji 1 ionea
noted Major araai Inspected rAdioluglcal tmcrgencY
prepare>dnes s
CLIHE.H E , JEMKfNSiO R Division of Emarjency Prsaaredness 6
Operattonel Bupport Sa/07/lfi ISpp 1 370il 037 24X
Fithe 90-2it,flS/fl9/t7, BSI013039A
Qperat I no lit
stage documents
6210080015 Addl response to FQ1A request for 19 categoriei D f Info
nuclear reactor events ( safety problems Foruards documshtt
listed in rtjip A Documents tn App B completely withhold Iruf
FOIfl Eieraption 5)
FELTU/i. J M Division of Rules and Records Q2/O7/12 UI>blL,R
Critical Mas* Energti Project ?pp I S665 037 2rtX
Flc^e 50-OOO, S2/O7/J2.
--BlOi2201&5 Provides results of discussion u/licensee TB appdrsiH
pToblem u/proper sealing of containment purge valves
Licensee estimattd that eicessive leakage condition occur rut
at freijuencij nf one tsnve for every five valve cycles
DAMCE.N C ffegion a, Atlanta. Office of tho Dirsctc-r 7H/ I 0.
^DRDAN. E L Division of Reactor Operations Inspections i?pp
1566S 1A5 34X Fiche 5O-OOO, 8P/07/ 12. Q2IOOB0015
13210070007 Responds tn PDIA request for
ight categi
steam geiieratnrs t< it earn turbines App A documents provided
in R Udell FOIA Request 81-313 Forwards documents listed n
App D
FtLTQK.J H Division of Rules and Records 82/CWIO
Uintfirop. Stimaon, Putnam * Huberts 9pp 15643 063
Fiche 50-OOO. Ba/08/IO. B21O070007
tOIJO. O J
MX
D207160044 FQIA i-oqujst for all Internal non-public dnrumortl. u na
evaluation reptu & other mabl dealing u/nuclear pl^nt
opera* i ona
KCIN"1S,D Neuis & Observer 92/08/17 Office Q F Adminii t TL
Ip 15B60 O6d 24X Fiche 50-000, 82/00/1 7, 02O7IR0014
02102B0013 Reaponds to FOIA request for all i nternal, non-pulil 1 1
tfocumentsi memos, evaJua tion reptj other rnstl dealing u/
nucle-ar plant operations Faruarda documents listed in App H
FELTED. J H Division of Rules and Records 02/09/17 HCIHHIh
New* fi Ooerver Spfl I 5BAO 065 24X Fiche 50-000. OZfOVf 17,
B2102G0013
7900130694 Recommgnds. licensee be requested to submit lalid tili.
process control program d offcite dase calculation (nariudl to
aid in timely revieu of radiological effluent lech Spoct
Foruat dt guidelines
COLLINS, J T Effluent Treatment Systems Branch 79/06/31
SCHWEUCER, A Operating Reactors Branch 1 (Pru 771030] IDpp.
15960 072 24X Fiche 30-000,02/09/17,0310200013
11070101-40 Ma rked-up memo re Q 10323 engineering evaluation rrpt tr,
010129 RCS leak Event I TBcummendat inns will fac taken into
consideration for Further evaluation Info has been
transmitted to utils
DENTCN.H R Dffica of Nuclear Reactor Rogulation. Dlv<(lor
SI/06/15 MICHELSDN. C Director's Office 3pp 1SR60 S3t l
Fich SO-OOO.SS/09/17, 8310260013
I10BS70422 NoUfiea that ubll B01201 request far lieenn ju
pent fuel pool storage eipanaion is acceptable Safety
evaluation d E1A Itiput encl
KREOER, W E Asiistant Director for Radiation Protectinn
01/07/23 NQVAK-T Atsistant Director for Operating Rti
6pp 1SB60 240 24X Ftche 50-000,02/09/17,8310380013
31120aOB5B FoTtiiardi Input to afety evaluation ! EIA of propoul
full pool torH8* capacity eipansion Evaluation & *pprl*il
bated on Info provided in 801301 Itr Proposed mod
actoptab la
HOUSTON, R H Ace id ant Evaluation Branch, Bl/11/17, VAROA, s
Operating R t actoT Br*ncd [ 3pp 15860 24i 24K
Fiche. 50-000,63/09/17, 821oaB0013
DOCKETED ITEMS
57
-0201,200650 Forwards technical evaluation of deviation in licensee
B1O333 response to requ iremcn ts of NUHEQ-O737 Item II F 1-1
Technical evaluation should be forwarded to licensee for
jus t 1 Pica ti on of deviations
JJREGER.W E Assistant Director for Radiation Protection
81/12/15 NOVAK> T II Assistant Director for Operating Reactors
2pp 15B&0 265 24X Fiche 5O-QOO. 82/Q9/ 17. B21O200013
9210150198 Responds to 02O707 request for rep t documenting pressuriier
power operated rellaf valvo I. pressuriier safety valve
failures per NUREG-0737, Item 1 1 K 3 3 No failures or
challenges identified from BIQ-401 to present
ZIKMERMAN.S R Carolina Pourer & Light Co B2/10/O9 VAF1CA, B A
Operating Reactors Branch 1 2pp 13707 271 24X
Fiche 30-261, 82/10/06, B21015O190
-t32O1.20'O6A2 "Add! Accident Monitoring Instruments t i on. " technical
evaluation of response to Attachment 1 of Item II F 1 of
MJREO-O737 Tun major deviations from requirements
unacc ep tan 1 e
HUCHrON.fi L Euon Nucleai Co . Inc (subs nf Euon Corp )
Ql/ I I/O=
15960 ?t,7 24X Fiche 50-000.02/09/17,82102130013
B2O322O5 1 4 Forwards safety evaluation ', EIA supporting util 020129
request lo allou use of circulating uater pump discharge
flou as backup source for dilution in calculating
radioactive liquid effluent release uhen pump out of svc
HOUSTON, ft U Assisfant Director for Radiation Protection
B2/O2/26 IIQVAK, T M Assistant Director For Operating Reactors
7pp 15CM 017 24X Fiche 50-000. S2/09/ 17, B2IO3B0013
B21O190709 Foruards "Supplemental Info for Degraded Grid Voltage
Analsi*'CP fe L.HE Robinson Nuclear Generating Station
Unit 3 " in response to B10131 request re adoquacy of
electrical distribution sys voltage
EURY,L H Carolina Pnuar & Light Co 82/10/14 VARQrt, 8 A
Operating Reactors Branch 1 3pp 15737 207 2flX
Fiche 50-261,82/10/1-1,6210190709
0210190720 "Supplemental Info for Degraded Qnd Voltage Ana 1 ij s i a, CP&L,
HB Robinson Nuclear Generating Station Unit 2 "
NARAYANI. I V , FIELDS, W W , CASEY, B J Ebacco Services, Inc
(subs of Gnserch Cprp ) B2/09/30 209pp 15737 290 24X
Fichu 50-261,62/10/14,6210190709
H2Q5O5i>4HO Forwards audit of procedures & training for pressurued
thermal shock Control room emergency procedures remain
uplghted touard core cooling & do not go far enough in
addressing pressuriied thermal shock issue
I1AZETIS,.C R NBC - No Detailed Affiliation Given 82/Q4/15
THOMPSON, H L Division of Human Factors Safety 30pp 15861 045
21X Fiche 50-000, B2/09/17, B21O2BO01 3
O209I501O& Provides requested add! info re 02073O pouer operated relief
tai*.e blocV valva failure Maint errors made during previous
activities listed
BflOWH, E . LANNING,W u Reactor Operations Analysis Branch
32/08/25 SEYFRIT.K V Reactor Operations Analysis Branch 3pp
ISBil 34-J 3-1X Ficfie 50-000.02/09/17,8210280013
--3210203042 Responds to encl E Urley 7B1229 request for extension to
aubmit draft effluent Tech Specs Request unacceptable Util
reason for eitensian not valid Draft Toch Specs must be
iub-nitted by 790215
COLLINS, J T Effluent Treatment Systems Branch 79/01/OB
SCHUEIICER. A Operating Jleactois Branch I IPre 791030) lp
15060 OB 1 ? ^4X Fithe 50-000, B2/O 1 ?/ 1 7, D2I O2S0013
--82-KKSQQB2 "Dosimetrij Placement fni Steam Generator Workers "
MARNnCtt, R Institute of Nuclear Power Operations 62/01/31
13pp 1SB40 310 24X Fiche 50-000. B2/09/17. B21O200013
Q210O1GQ51 Ac k receipt of 820S23 Itr requesting temporary relief from
c o"ni tments re training of shift technical advisora Program
approved ! request foiujrdeif to NOR for evaluation
O'REILLV, J P Region 2, Office of Director 02/09/20 JPNES, J A
Carolina Pouer & Light Co lp 1 53ft S 333 24X
Fiche 50-000,02/09/20,8310010051
6210260475 Application to amend License DPR-23. revisi ng Te^ch KpecB to
clarify In-place testing criteria used on iaFetij-re lated
HEPA filter sui fc compliance y/mare recent ANSI s td
EURV, L (J Carolina Poujar t, Light Co 02/10/22 VARGA, S A
Operating Reactors Branch 1 Bpp 15006 220 24X
Fiche B0-2il. 02/10/33,6310360475
8210260493 Proposed Tech Spec changes clarifying in-place tositino
criteria used on saf ety-rela ted HEPA filter sys tt
compliance u/more recant ANSI std
* Carolina Poumr K Light Co 82/10/22 2pp 1 5806 230 24 X
Fiche 50-2il,8S/10/Sa. 0210260473
92I026090B Application for amend to License BPft-23, revising Tech Spec
to clarify limiting conditions of operation ifor pressuriier
code safety valvoi
eURY.L H Carolina Pouier b Light Co 03/10/S2 VAROA. S A
Operating Reactors Branch 1 2pp 15909 133 24X
Fiche 50-261, 62/10/22, B21036Q500
0210260511 Proposed Tech Spec 3 1 t 3 re pressurlior code safety
valves
Carolina Power & Light Co 02/10/S2 lp 15903 135 24X
Fiche 50-261, aa/10/32. B2102i050a
9310290358 Requests intension until 821215 for submltlal of schedule
TMI Item II H 3, "Past-rtc c iden t Sampllnn By S " HRC 020924
request for addl info significantly eipanded scape of uark
ZIMMERMAN'S R Carolina Pouer i- Light Co 82/10/36 VAROA, S A
Operating Reactors Branch 1 lp 15B53 04? 24X
Fiehe 30-261. 02/10/3A,BaiOa90398
O Inspection reportsr IE Bulletins t correspondence
2|0 1 0197 Renuests addl info documenting linui each criterion of
liUHEQ-0737, Ii-em II B 3. "Post-Accident Sampling Bus" ha>
been satisfied, in ordHi to conduct post-implementation
re/ieu Schedule requested within 20 daijs
VAROA.S A Licensing Branch I 82/09/24 JONES, J A Carolina
Pouer & Light Co lOpp 15976 247 24X Fiche 50-261, B2/09/24,
6210290177
8210070007 Responds to FOIA request For eight categories of records re
steam generator! & steam turbine* App A documents provided
in R Udtll FQIA Rfqueit B 1-313 Forward i document) listed In
App B
FELTOH, J H Division of Rule* and Records 93/08/10 LONG. D, J
Uinthrop, Stlnnonr Putnam & Roberts 9pp 15645 063 24X
Fiche 30-000,82/00/10,9210070007
831005000^ Advises that response to 920310 request For addl info re
rJLifIEG-0737, Item I! B I. "RCS Vents, " will be submitted &
.nontbs 4 e- fore end of first refueling scheduled to begin In
Dec 19B3
EURV.L II Carolina Pouer >, Light Co 82/10/01 VAROA, S A
Operating Reactors Branch 1 lp 156OS 192 24X
Fiche 50-261,92/10/01,021005000?
S2 10060013 Application to amend License DPR-23 consisting of revision
to Tec& Specs providing three auiiliarij feeduater purapi
operable prior to eiceeding HCS temp of 350 f
EORV.L IJ Carolina Power t. Light Co B2/10/01 VARGA, S A
Opirating Reactors Branch 1 2pp 15619 074 24X
FUha SO-261, 92/10/01,8210060013
031007013? Forward! tabulated data on steam generator Inap & malnt at
facilities Data shoulif be provided to licensees
IPPQLITOiT nperating Reactori Alignment Branch 82/01/01
VAROA'Q Operating Reactors Branch 1. 9pP 15645 131 24X
FiChS 50-000,92/08/10,8210070007
9210070172 Foruarils irifa re steam generator intagnty ti Inflpa at all
op*riting PWR, pir 7303HO & 21 requeiti Details of Intpi,
Including defect Indicationi, tube ptugsin) criteria t- tubei
plugged mill not be provided eicept for Paint Beach 1
OQLLER, K R Division of Reactor Licensing (NRR-1975 only)
75/03/24 MACCASY.fl R Division of Tachnical Review (NRR-197G
only) Spp 1564S 196 24X Fiche 90-000.02/00/10,8310070007
0210060016 Proposed revision to Tech Specs providinfi three auxiliary
feeduater pumps operable prior to exceeding RCS temp of
350 F
* Carolina Power (. Light Co 92/10/01 Spp 15615 076 24X
Fiche 50-361. 82/10/01. B2100600I3
8210010173 Forwards IE fnep Rept 50-261/82-30 on 830810-13 No
noncomp 1 iJnce not id
VERRELLI.D M Division of Project k Resident Programs 62/09/09
JONES, J A Carolina Pouier it Light Co 3pp 1S36B 132 24X
Fich* 50-261, 82/09/08.6210010173
82 IO1 &0264 Foruards addl info re plant-specific homogeneout numbar
dentlties for matls >j fluid in reactor vessel core region,
per 32(3917 request for info re pressurized thermal shock
ZliMMERHAN.S R Carolina Pouer t Light Co 82/10/07 VAROA, S A
Operating Reactors Branch 1 7pp 15703 254 S4X
Fiche 30-261,32/10/07,0210150264
0210010176 IE Imp Rcpt 50-261/82-30 on 820810-12 No noncomp 1 iance
noted Major artai lnif>*cted post-refueling startup teats
& closeout of earlier nforcemtnt item
BURNETT.P T , JAPE, F Dlvitlon of Engineering & Technical
Programs 62/09/02 6pp 1B36B-134 24X Flcha SO-261, B2/09/OB,
B210010173
DOCKETED ITEMS
6310130396 Forward* IE Imp Rept 50-261/02-37 on 620616-19 No
noncnmj) 1 ianc* noted
LEWIS. R C Division of Project t Resident Programs 82/09/17
JOtJES.J A Carolina Pouer tc Light Co 2flp 15704 035 24X
FUhe 50-361., 33/09/17, B2HM50396
92IOJ5G40I IE Imp Rept 50-261/B2-29 on B3QSI6-19 No nonccmplia
notad Major artai inspected radi ul og lea 1 emergency
prep-areifna* i
CLIHE.U E j JENKINS, Q R Divliion of Emergency Preparedness
Operational Support B2/O9/16 ISpp 15704 037 24X
Fiche 50-261, 62/09/17. B310150396
8210190240 Forwards updatad LER BO-027/OIT-1
STARKEY", R B Carolina PDUJPF t Light Co B2/1O/1I O'RE ILLV. J I
Rgion a. Office of Director Ip 19745 196 24X
Flche SO-3
--B3I0190244 Updated LER 90-027/01T-1 on 601 122, re laij FIT-9 in re
protection train A failed to re-energile during periodic
telt of reactor protection logic Caused by shorting of lead
uire connection to call wires Relay replaced
CDX,ff T Carolina Power J. Light CD 82/1O/11 Region 2,
of Director 4pp 15742 197 24X Fiche 50-261.82/10/11,
02101902-10
62I0150-19-3 Reo.uei.ts addl info re util response to IE Bulletin BO-ll.
"Masonry Wall Design " Info required bg 021133 to complete
revieu
VAROA.S A Operating Reactors Branch 1 BB/10/Q4 JONES. J fl
Carolina Poiuir & Light Co 4pp 15717 271 24X
Flcha 10-Eil. B2/1O/04, BSHH50493
S20Q190233 IE Info Notice 00-35, Buppl 1- "Leaking t- Dislodged 1-125
Implant Seed! " Bvc lit encl
CDBB.L r Dlvlilon of Fuol Facilities, Material* 6 Safeguards
83/10/06 Coniolirfated Edison Co of Ngu York 66pp 19761 250
24K Fitn 50-OOO, 82/10/06, B30BI9O233
6210290074, Forwards updated LCH S1-031/01T-1
STARKEV.R B C*rnllna Pouor b Light Co 82/1O/22
Rigion 2, Office of Director Ip 1 S9S4 Q3fl 24X
Ftchs 50-361.82/10/22,8210290074
D'RETLLV.J
--6210290070 UpJatetl LEH BI-031/01T-1 on 81 12O1 , dur ing hot thutdoun.
presturiier PORV block valve o>parators diif not fullij shut
block valves Cauiad bij improper rasint Valves closed
nanua 1 Ig
COX.H T Carolina Power b Light Co B2/1O/22 Region a. Cffit
of Director 3pp 159S4 029 24X Flchc 50-261,62/10/32.
8210290074
IE Bulletin B2-03, "Stress Corrosion Cracking in Thict-
Usl i. Lirgs-Di amt*r, Stain 1 ifsi Steel , Rec Irrulatlon Sg
Piping at BWR Plants " Svc list ncl
DEVOUNO, R C Director's Office, OFfic* of Inspection and
Enforcement 82/IO/L4 Conin 1 idated Edlsoci Co of New York
H5pn, 15010 125 34X Flche 50-000.63/10/14,8303190238
B21O220495 Act receipt of 621 DOS 1 tr informing MRC of steps taiun to
correcb vlolationa noted in IE Jn*p Rept 50-261/62-37
LEWIS, R C Division of Project 4 Hesldent Programs B2/1Q/18
UTLEY.E E Carolina Power &> Liaht Co Ip 13779 009 24X
Flche 50-261, 9E/10/1B, B210230195
6210290333 Foruard* LER 82-013/03L-0
STARKEV.R B Carolina Pouer & Light Co B2/10/23
Region 2, Office of Director Ip 1 5B53 103 24X
Fichu 50-261, B2/10/2S. H2I0390333
O'REILLV, J
-- 6210290339 LER B2-013/03L-0 on SS0923, svc uater pump A Failed U
riitart following periodic to at Cauied by failed control
pouier futes Fuses replaced d pump started b ratcsted
COX.H T Carolina Power t Light Co B3/ iO/33 Region 2, (
of Director 3pj> 13033 104 24X Fiche 50-261,62/10/22,
8310290333
--0210520499 fiesiponds to NHC 83090S Itr re violations noted In IE Insp
RBpt 50-261 /82-S7 Currectfve actions changes to plant
operating manual included in permanent change book &
operations revltlona statui list updated twice weekli;
STARKEV-R B Carolina Pom.r t Uijht Co 83/10/00 O'REILLY.J P
Region S, flffie* of Director 4pp 15779 010 SIX
FUha 50-2il,B2/lO/ia. B-210230495
8210220500 Forwards IE Insp Rep t 30-2M/B2-27 on 820711-0810 fc notice
of violation
LEWIS, R G Division of Project t Resident Programs 62/09/08
JCWE3, J A Carolina Pouer & Light Co Spp 15779 014 54X
Fiche SO-H
DDCHET 30-263 HDNTICELLD NUCLEAR OENERATIHQ PLANT
F Security, medical, emergency & Fire protection plans
8210150395 Forwards IE Insp Kept 50-263/82-09 on 020703-0929 Mo
none amp 1 ianc e noted
STREETER, J F Division of Project t> Resident Programs B2/0<J/;>a
LARSON. C E Northern States Pouier Co 2pp 15703 272 24X
Fiche 50-363, B2/09/SB, 8310150385
8210150-386 IE Insp Rent 50-263/32-09 on 020703-0020 No noncgnp I U
noted Major areas inspected LER fol louiup. operational safety
verif ication. fire protect ion/ prevent ion, securitg perannnel
quail Hca ti ons, operator overtime U onslte review commlttoe
EROHH, C H , MADISON, A L , WALKER, R Division of Project b
Resident Programs 82/09/26 5pp 1S703 274 24X
Ficne 30-263, 62/09/20, B210I5030S
DOCKETED ITEMS
~-B210QIOQ4i Proposed Tec ft Specs re surveil lance, reactor pro tec t inn
iron i tor i ng sys, jet pump surva 1 1 1 anc e, orga nl la t ion I steam
line area temp suited deviation
Northern States Pouer Co 05/09/24 60pp 15565 IBS SIX
Fichff 50-3B3. 82/09/24. 82IOQIO036
821024O209 Forwards check to complete fee payment far Addendum 1 to
8O1O10 license amend request
MUSOLF, D Northern States Pouer Co 62/10/22 D1GOS, R H License
Fee Management Branch Ip 15799 153 24X Ffche 50-363,83/10/33,
8210260209
21OQi0377 Forwards application for amend to License DPR-22,App A
Amend changes Pages 207 >, 2O9 to remove 3-cycle per minute
mm source range monitor count rate when tuo or fewer
d>d jacent assemblies eiist in quadrant
fHISnLf. D Northern States Pouer CD 82/09/30 Office of Nuclear
tteactor Reflation. Director Ip 15615 340 24X
Ficfce 50-2,63, 82/09/30, 82100A0377
-6210060380 Application for amend to License DPR-22, App A Amend changes
Paiges 207 fc 309 to remove 3-cycle per minute mm source
range monitor count rate uihen turn or feuer adjacent
as-s-enb 1 1*5 eiist in quadrant
KUSOLF, D Northern States Pouer Co 82/09/30 4pp 15615 341
24X Fiche 50-263,02/09/30.8210060377
-B21OQAQ3B6 Proposed Tech Specs 3/fl 10. removing 3-cycle per minute mm
source range monitor count rate uhen tuio or fewer adjacent
as-semol ies eiist in quadrant
* Northern States Pouer Co B2/09/30 3pp 15615 345 24X
Flthe 50-263.82/09/30,8210060377
Inspection report*. IE Bulletins t, correspondence
0210030015 Addl response to FOIA request for 19 categories of info re
nucloar reactor events & safety problems Forwards documents
listed In App A Documents in App B completely withheld (ref
FOIA Eiemptlon 5)
FELTQN.J M Division of Rules and Records 82/07/13 UDELL jfi A
Critical Mai* Energy Project 9pp 15665 027 34X
Fiche 50-000,82/07/13.6210080015
-S105380476 Request! that regions confirm licensee lubmittal of rept fur
satisfactory imp 1 emantation of Item 4 of IE Bulletin 7"7-26,
Ravi si on 1
JORDAN, E L Division of Resident & Regional Reactor Inspection
Bl/05/18 CRIER, B H Region 1. Philadelphia, Office of the
Director (81/O3/01) O'REILLY.JP Region 2, Atlanta. Office of
the Director (81/O3/01) KEPPLER, J Region 3. Chicago, Office
of the Director (81/03/011 Ip 1 S668 130 24X
Ficho 90-000.82/07/12,9210000015
S21Q] 3O261 Submits add! info re application For single loop operation
licence amend, In response to HOC 830920 request MAPLHGR
reduction factors reviewed by OE & found applicable to
Cutle 1O
MU5GC.F, D Northern States Power Co 82/10/O5 Office of Nuclear
Realtor Regulation. Director Ip 15676 014 34X
Ficfie 50-263,82/10/05,8310130261
e21Ol3O2tO Discusses implementation of NflC guidelines for worling
FiourSi provi ried in Generic Ltr B2-12 Revised 1 guidelines have
been imp I cmen ted, tu/e icep t i ons of 72-Ji per uk limitation !i
relief from control ftoard duties
HtjSOLF. D Northern States Power Co 82/10/07 Office of Nuclear
Reactor Regulation. Director 2pp 15676 013 24X
Fiche 5Q-000, B3/1O/O7, 021OI3026O
6210150-364 Forwards response to request for info In Sections 3 it 2 3
of Oeneric Ltr S1-O7 re overhead handling ays Revloed 9
month subroittal. "Control of Heavy Loads" & review of
special tifing devices also enc I
r-,USULF, D Northern Stales Power Co 02/10/11 Office of Nuclear
deaclor Regulation. Director I6p 15715 103 24X
Fiche 50-363. B2/10/1 1, 83101 5O364
B3IOI5O377 "Evaluation of Conformance iu/NUREQ-0612 for Dryuiel I/Reactor
Ve*el Head ! Dryer/Sepal ator Sling Lifting Devices "
BMITIJ.SH . VQGEL, T N NUTECH (Nuclear TechnoUfly, Inc )
H3F-77-Q08 83/09/29 Hpp 15715 118 24X
Fiche 50-263,82/10/11,8210130364
--8310150500 "Design Spec for Reactor Vessel Head Lifting Device "
FISCHER, L , VOGEL, T N . SMITH, J K NUTECH (Nuclear Technology,
Inc ) NSP-77-OQ1 ROO S2/O9/H4 9pp 13715 132 24X
Ficfie 50-263,82/10/11,0210150364
B31O15050") "Evaluation of Selected Special Lifting Devices for
Compliance u/NUREO-0612 "
SMITH, JK , VQGEL. T N NUTECH (Nuclear Technology, Inc )
hSP-77-007 ROO 82/09/24 I2pp 15715 141 24X
Flcfie 50-263,82/10/11.8210150364
821015O3BS Foruardi IE Insp Rept 50-263/82-09 on 820703-08S8 No
nan camp 1 la nee noted
STREETER, J F Division of Project tc Resident Programs 02/09/30
LARSON. C E Northern States Power Co 2pp 15703 272 24X
Fiche 50-263, 83/09/28, B2101903B5
--82I01503B6 IE Insp Rept 50-263/82-09 on 820703-0828 No noncompl ianco
noted Major areas impacted LER fol loiuup, operational tafaty
verification. fire protec tion/prevention, s ecuri ty personnel
qua 1 i f icati ons, operator overtime & onslte revieui committee
BRQUN.C H , MADIsgN, A L , WALKER, R D Division of Project &
Resident Programs 82/09/28 5pp 15703 374 24X
Fiche 50-263.82/09/28,8310150385
82I013O166 Confirms plans for 921014 meeting in Olen Ellyn. IL to
discuss proposed corrective action for cracks In welds
on indcap of rec irculation Loop A
SPESSARDi R L Division of Project d Resident Programs 82/10/05
LARSON, C E Northern States Pnuer Co Ip 15673 053 24 X
Fiche 50-263, B2/IO/05, S210I30166
820819D233 IE Info Notice 80-35, Suppl 1, "Leaking & Dislodged 1-125
Implant 8eeds " Bvc Hit end
CODG. L I Division of Ful Facilities, Materials Si Safeguards
82/1O/06 Consolidated Eifiion Co of He a York 66pp 13741,390
24X Fiche 50-000. 82/10/06, B209190233
020819O238 IE Bulletin 82-03, "Stress Corroaion Cracking In Thlck-
Wa 1 1 1 Large- Dl amateri Stainless Steel, lieclrculati on Sys
Piping at BUR Plant* " Svc list encl
DEYQUNO.R C Director's Office, Office flf Inspection and
Enforcement 83/10/14 Consolidated Edison Co af Hew York
115pp 15810 123 34X Fiche 50-000,02/10/14.8308190239
82102S0320 Confirmatory action itr re actions util uill undertake as
result of 821014 meeting at Region 3 ofc re crack
indications found on uelds on rec irculetion sys piping
KEPPLER.J 0, Region 3, Office of Director 02/10/19 LARSON. C E
Northern States Pouer Co 2pp 15790 224 24 X
Fichu 50-363,02/10/19.0210250330
B31O15Q509 "Design Spec for Dryer Si Steam Separator Sling Lifting
D-evice- "
FISHER, L . VQGEL.T N . SMITH, J K NUTECH (Nuclear Technology,
Inc ) N5P-77-003 ROO B2/09/34 9pp 15719 153 24X
Ficho 50-263.82/10/11,8210150364
B21O19O479 Informs that control room & technical support ctr
habltabU itu *y* mod, per NUHEQ-0737, I tern II D 3 4 will be
delayed until S30515 due to need for denon work, untimely
naEI delivery & low productivity Revised schedule encl
MUSOLF. DJ Northern States Power Co 82/10/13 Office of Nuclear
Reactor Regulation, Director 3pp 157-10 263 24X
Flche 30-263,82/10/13,8210190479
9310350320 Confirmatory action Itr re actions util will undertaha as
result of 021014 meeting at Region 3 ofc re crack
indication* found on welds on r selrculation sys piping
KEPPLER, J Region 3, Office of Director 82/10/19 LARSON, C E
Northern States Power Co 2pp 15790 224 24X
FUhe 50-263.82/10/19,0210350320
8 Reportable occurrences, LEfts b related correspondence
8310150174 Forward* LER B1-020/Q3L~0
MAYER, L Northern States Power Co 81/08/24 KEPPLER.J 0.
Region 3, Chicago, Office of the Director (81/03/01) Ip
13707 193 24X FichB 30-263. 81 /OB/24, B2101 50174
8210150180 LER B1-020/03L-0 on 310724, main stream leak revealed in
drain line ta condenser Caused by piping leaking immediately
dounitream of 43 degree elbou due to eroeion It impingement
resulting from steam fc uater flow from restricting orifice.
TOBIN.P A Northern State*. Power Co Bl/08/34 Region 3i
Chicago, Office of the Director (81/03/01) Ip 19707 194 24X
Fie he 50-263,01/08/24,8210130174,
B2100SOIB2 PNO-II1-S2-103 on B20929, rad ic-grap h of recireulation loop
cap A revealed four cracks extending from weld root into
adjacent heat-if f ec tad lone Mo through-wall cracking
evident Repair procedures und'er evaluation
WALKER, R , JORDAN, M Region 3, Office of Director 82/09/28 Ip.
1S603 344 24X Fiche 50-263,82/09/28,8210050162
DOCKETED ITEMS
9210130396 F^nu IE i**t .tt so-atuez-a-J
^n'r'Si^r, of Fr^ct H.,-.n. Fr.jj.-.
JWEB.JA C*ToUMPWt tLljM O 2 " 1570403
Fichi 50-261. 8J/09/17. 8210150396
-6210150*0! IE IW S*P* 30-361/63-2? " 620616-19 Wo nincQMUM
nti* Major *r.s In.pettil rai.i.iE.l ,nta*nc v
a. rational Support 82W1* 19P
Ftche 50-341. 88/09/17. B2I01503W
9310190240 Forwards updated LER BO-037/01T-1
STARKEV.R B Carolina Pauer t LlBht Co B3/|(>/11 Q
Recion 3. Office of Oiroctor lp 13J"42 I'M .MX
Fichu 50-261, 22/10/11,8310190340
--8210-190244 Updated LER BO-027/01T-1 on GUI I J, rUy "t V ,- "'
(ratectian tritn A failed (o re-enorij i iu during pfrisiiic
ttt of ractor protection logic Caiisud t n vh|jrlin( e t Ui'
uire tonnaction to coil uires Relay rcpl.icod
CQX'H T Carolina Poiuer !. Light Co [13/10/11 l!i|u~""
Df Director flPP 15742 197 2-1X Fich* HO ,'M, Hj/ [0. II
831 01 90240
aJdl info re u* ' 1 response to IE Bulletin 90-11,
n - Inf. roquirfrd by
A Op.r.t.ng BMtUr. Branch 1
Carolina Pou.r i Llaht Co 4pp 15717371
FUht 80-261. HB/10/04.G2I0150493
JQ(fES '
B30BIWB33 IE Ufa Notice 8O-3S.
1. "UaUr. B * Dislodged l-
v
B3/1Q/06 Consolidate Cd(n Co of
24K Flch 50-0
8210290074 Forwards updatoo LER
BTARKEV^fi B Carolina Poiuer (, Light Co
R*glon 2, Office of Director lp 193
Flche 30-2S1, B2/10/23. 0310290074
6310290070 Updated LEU S1-031/OIT-1 on Bl 1901. dm th<g n I
(rea<uri>Br PQHV black valve operator! did nut It'lJ^ i
block valve 5 Caused dy improper maint V<lvu iU<it|
ruriuai Ii;
COXhM T Carolina Poiuer & Light Co UJ' Kl/J.' li
of Director 3pp 15854 OK9 3flX Fichu 10 J6J,(i.^]i
B20ai-!Oa3B IE tulUtfn B2-03. "Btr S
on Crt ing in Thicl
,
Piping at BUS Plant* " Svt Hit "=V
DEVOUNO.H C B*cti"i Of*<. 0". o Inspection >*
Eftfort-nt BB/IC/U Com olldated EJlsonCo of MeuVorfc
i MK Fi.n. 50-000.62/10/14,0308190233
BS10220493 AcK r.t-ipt *f 021008 1 fer informlnfl MRC of iteps tlm to
correct vl.lli*i>i notad In IE Insp R*pt 90-261 /SB- ?7
LEUIB.R C Dtvl.i<m ttf ft.^t ""* ^^SVrw 1
UTLEV.E E Carolina PDI^BT i Lljht Co lp 13779 009 24X
Fiche BO-261. 92/10/13. 82(0220'! 9 5
3210-590333 Foruarils LCR 82*01 3/03L-0
STARHEY.R B Carolina Power Si Light Cu HV/ltiS-r'
fiBoion 3, Off let, of Director lp 15E1SJ 101 J4i
Ficho 30-261,62/10/22. B2I0290333
0210290339 LER 62-013/O3L-0 on H209H3. SVL u*tir pn
rt ft Art following periodic teat Cauioil bij fall*)
power fuses Fuses rnplaced & punip ttjrluJ t. ula
CQX'H T Carolina pouer S- LM'it Co HJ/ 10/J^
or Director 2pp 13Q53 104 SIX ritbt fill Jt,l,
8210390333
? fiespondl to KftC S309QB Jtr r violationi noted In IE Inap
R.pt 50-261^63-37 Corrective actiom thangea to plant
oosiatlnj runual incluileiJ in permanent change toirlr 6
O priiton r.vi.lons .t4tu* Hit updated *"*** tlI W n , Dlr ,, . )p
BTMKEY.R Carolina Power (. Ulght Co 02/10/OQ D'REltLV.J P
n*?in 2- Olflct of DlfBctor 4pp 13779 01O 24X
Flehr 50-861, BanO/lB. 8210230495
Rept 50-Eil/B2-27 on OH0711-OB1O t. notice
8210^205(30 Fotur.^* IE
a c ""oivislan of Proj*ct i Resident
. A Cal-ollna Powr t> Llht Co Stt
Fiche,50-S6l,aa/lO/fB.fl310220495
ogr-am* B2/07/OH
15779 014 24X
-B21022050I Notle* of violation from insp on 620711-0310
Bullion of Prajtt !, Resident Program &3/09/OB
15779-01A 24X FiKha 90-261- BS/lOflB.B3W32f>W5
iff
6310320504 IE In*P Rpt 50-2&1/S2-27 on 820711-0310 lion ( omp li ante
notad adttuatf, review procedures not imp! minted for ftilnt
procedure MPI-10 for lafetu'felated Instrument valv
UElSE.s", BUROEfl.C Division of Project k Resident ''''Ol'-ams
82/09/02 lapp- 0779 013 24* FUtie 50-261,82/10/13.9210220499
R Periodic operating reports t, related corroipondEnee
9210130242 Forward* monthly operatlna rept for Bept 19S&
STAFWEY.R B C.rolina Power ft Lloht Co 02/lQ/OB &EVOUMO. R C
Qtretoe' Offic*' Office of Intfectlon *nd Enforcement lp
I5A7B OP6 24X Fithe SO-B61. B2/1 0/09,031 01 3024B
8210130244 Monthly operating npt tor Bipt 1982
NORRtS.HR Crallna PUT (. Light Co B2/10/03 3pp
18678 097. 24X Plena: 50-261 , 32/10/06.821 0130242
3 Reportage onurrences. LEFi b related correspotidenie
B2iQBa026S Forward* LER B2-OI2/03L-0,
STARK.EY.R.B Carolina Power b Light Co B2/10/OA D'REILLV.J.P
H.jion 2. Offici- af Director, lp. 15776 B02 S4X
BS10220S67 LCR 83-Oia/03L-0, on 820<!06,t 94X power, latdcun rrllef valve
CVC-3O3 llftid t uould not rr*aat Caintd by w(er hamntr
UJ* to ap4T*tor trror in realignment of charging pump fron
rtclrculiUon la normal opratlon. Operator counseled,
COK, K. T. Ciroltna Pouir fc Light Co 32/10/06 _RsIon 3, Office
of Director 3pp 13776203 24X flche 30-Sf.l, I
3810330869,
DOCKET 30-263 MONTICELLD NUCLEAR QENPIATKW I't ftlH
F Securitui medical, amergcniy t fire protocUon
B210150335 Fruards IE Insp Rept 30-263/Oa-OV on ll.'itA h
none om pi lane a noted
STREEren.J F Division of Project t> ntldtnl t'uijn**.
LrtflSOtf.C E f/orthern State* pouor Co 2pp O/i'i.*,
Fiche 30-243, 02/09/23, Q2I 01503B5
BSI01&0396 IE Insp Rept 50-243/82-OV t,n UM /ill l-K.il
no(i( Major arei inpacted l-ER f ollauup, aim tl H i
veri fic^tioni f ire protec t ion/prevnn 1 1 un. *i t I li
qual if icatl on*i operator overtime fc onilte I tv 1 1 j t ..
DflOWWiC H . rlAOISQN, A L , WALKER, R D 1)1 vl t lur. u
RnUent Program* 32/0-7/aa 5pp 13/0 I JM .<
Flc^e 5-0-263. 03/09/33.0210130305
32102-60190 B*nueti that R HaUer OB addd lu I
to provide for uncorted acc to vlt#l t a
HEPPLER.J Region 3. Office of Director
Nortnern 3tat. Pour Co lp 13799 160 J
82/10/30,
P Operating license tage documents li corripOMii-[ i
B210040003 Responds to H20B2S I tr re spent lul r . ...... ^
nutlficat ion rea.u(rmahts of *hlpmnntt o* I rraduiiif ' M '
fuel contained In 10CFR73 37
KEHCZEBjM B RejJon 3i Office of Dlractor HjjUilm ;* *
Minnesota, State of 2pp 13577 26? 8AX MiM ' .4 1 t.'
8310040003
0210010060 Forwards modified Info to B20907 iuppUm n 1rl ">* <
60(008 license amend request
MUSDLF.D, Northern State* Poutr Co Da/Of/JJ <**i.i'!
RtactoT Regulation, Director 13pp 13347 19* "i
Fteh 30-263,812/09/83,8210010060
8S10010036 Forutirds proposed amend to Llcente DPfl W (Ji'a
Sneci In areas of *urveU lance, reactor pt*t*Hl *>'!'' 't
sus, jet pump surveillance, oroan 1 latlon k lt* M' '***
temp twitch deviation
MUSOLF.D Northern States Power Co B2/09/B* tt*tinivi
RMctor Rvgulatlon, Director lp ISS&5 |M 3^'
Flche- SO-263, 92/09/24, 8310010036,
3210010041 Proposed amend to LUent DPR-aa^ **>! "* *- **'
ar*t of surveillance, reactor protettian **HTin m- .*i
pump surveillance, oroniitlon t tna lHi ** ****
u Itch deviation
HUSDLF. B Northern Statel Power Co B3/OVJ-* - -
S4X FlcJK'BO-263, 82/0-P/24I8BI 0010036
DOCKETED ITEMS
59
-921001OO46 Proposed Tech Specs re lurvs 1 1 lance, reactor protection
man I ^ur ijig spjs.jet pump surve 1 1 lane ei organi lation & steam
Northern States Pouier Co B2/09/34 fiOpp 15565 1Q3 2-!X
Fiehe 5O-263, ea/D'9/34. 8210010036
9210260309 Forwards check to complete fee payment tor Addendum 1 to
001010 license a maud request
MUSOLFj D Northarn State* Power Co 82/1O/23 DIGOS, H M License
Fee Management Branch lp lS7ff i 5S 24X Fiche 50-263,82/10/35,
BZI0260ZO9
a210O60377 Forwards application for amend to License DPR-32.App A
Amend changes Pages 207 'j 209 to remove 3-cyclo per minute
mm source range monitor eg tint rate iirhen two nr f euier
adjacent assemblies eiLst in quadrant
1USOLF, l> northern States Pouer Co 03/09/30 Office of Nuclear
Reactor Regulation. Director lp 15615 340 24X
Fiche 50-263. EJ2/09/3Op 8210060377
B2I006O3BO Application For amend to License DPH-33.App A Amend changes
Pages 207 ( 309 to remove 3-cycle per minute mm source
range monitor count rate when two or feuer adjacont
assent I te-s emt in quadrant
r-uSOLF. D Northern States Power Co O2/09/30 4pp 1S613 341
2'IX Fiche 50-Si3, 92/09/30. B2lOQi0377
B2100i03Bii Proposed Tech Specs 3/4 10. removing 3-ccle per minute min
source range monitor count rate uhen tuo or fewer adjacent
assemblies enst in quadrant
* UoT'hern States Pouer Co 83/09/30 2pp 1361S 345 34X
.Flclip 50-263. B2/09/30, Q3I0060377
Q Inspection report 5. IE Bulletins &. correspondence
B31OOB0015 ArJdl response to FOIA mqueit for 1*? catenaries of Info re
nuclear reactor events & safety problem Forwards tfocume-nta
listed In App A Documents in App completely mltJiheld (rqf
FQIA Eiemptinn 5*
FELTQN. J M Division of Rules and Records B2/O7/1H UDE4.L.R A
Critical Mass Energy Project If p 15&A9 027 24X
Fiche 50-QOO, S2/07/I2, B2IODS0015
-6103380476 Requssts that regions confirm licensee submittal of rpt for
jatiafactory implementation of Item 4 of IE Bulletin 79-24,
Revision I
JORDAN. E L Division oP fie 5. 1 du tit 1 Regional Rede tor Inspec t ion
81/05/18 OR1ER.B H Region IP Ph 1 lade I ph ia, Office of the
Director (Bl/03/01) D'REILLV.JP Region 2, Atlanta, Office of
the Director (B1/O3/01 ) KEPPLER, J Q Region 3. Chicago, Office
of the Director <S1/03/01J lp 1 5668 130 SAX
Firhe 50-OOOi 82/07/12. 0211308001 3
aaiO13026] Submitj addl info re application fo\ single Ipop operation
license nmetid, ltl response to HflC 820920 request HAPLHGR
reduction factors reviewed bij G te Found applicable to
Cyfl? 10
MU5DLF, D Northern States Pouer Co SS/IO/OS Office of Nucloar
Reactor R&gulatinn. Director lp 15676 014 24X
Fiche 5O-263, 02/10/05.8210130261
B210I3D2&0 Discusses implementation of NRC guidelines fur working
hours, provi de ri In Generic Ltr 93-15 Revised guidelines have
beon imp I emen ted, u/Hicep t loni of 72-h per uk limitation t-
relief from control board duties
MUSOLF. D Northern States Pouer Co Q2/IO/O7 Office of Nuclear
Realtor flegul ation, Director ^pp 15676 012 34X
Fiche 50-000,132/10/07,3310130360
Forwards response to request ror info in Sections 3 2 !< 2 3
of Generic Ltr 01-07 re overhead handling sys Revised 9
month suBmlttal, "Control of Heavy Loads" it review of
special lifinj devices also enc 1
MUSULr, D Northern States Poiuei Co 82/1O/11 Office of Nuclear
Reactor Regulation, Director li,p 15718 102 34X
Fiche 9O-263, B3/10/H. 021015036^
-K210I50377 "Evaluation of Conformance u/N(JREC-06ia for Dryuul 1/Reac tor
Vessel Head !, Drv*f/Sepai ator Sling Lifting Devices "
SMITH, S K . VOGEL, T N NUTECH (Nuclear Technolngij, Inc )
NSP-77'OOB 82/09/29 |4pp 15713 I1B 31X
Fiche 5O-263. 02/10/11.8210150364
--8310I50500 "Design Spec for Reactor Vessel Head Lifting Device "
FISCHER. L . VOGEL, T N , SMITH, J K NUTECH (Nuclear Technology,
Ine ) NSP-77-OOI ROO 82/09/24 9np 15715 132 24X
Fiche 50-363,02/10/11. B210150364
B2IQJ5Q50'J ''Evaluation of Selected Special Lifting Devices for
Compliance u/NUREG-0612 "
SMITH, J K . VOOEL. T N NUTECH (Nuclear Technology. Inc )
NBP-77-OO7 ROO 93/09/24 ISpp 15715 141 34X
Fiche 50-263.82/10/11-8210150364
--8B10150509 "Design Spec for Dryer li Steam Separator Sling Lifting
Device "
FISHER, L , VDOEL.T N , SI1ITH, J K NUTECH (Nuclear Tdchnolony,
Int ) NSP-77-003 ROO 82/09/24 9pp 15713 153 34X
Fiche 90-263,BS/1O/1I.B210130364
621019047? Inforini that control roam & technical support ctr
habttabi 1 itu. sijs mod. per NUREG-0737, Item II D 3 4 ui 1 1 be
delayriJ until 830515 due to need for deugn inorki untiffli ly
rnatl delivery & lou productivity Reviled schedule end
rtl/SOt-Fp D Morthern States Pouer Co 82/10/13 Office of Nuclear
fljjclor Regulation, Director 3pp 1574O 263 24 X
fiche 3O-363, B2/10/13. 8210190479
8210350330 Conf inflatory action Itr re action* util uill pjndrt*U as
res-ult of 831014 meeting at Region 3 oft re crack
indications found on ueldi on rec irculation *ys piping
KEPPLEfi.J O Rigion 3. Office of Director B2/10/19 LARSON, C E,
Northern Statts Pouer Co Spo 13790 321 24X
Ficha 5-0-263. B2/IO/I 1 ?. S2I0250320
6310150395 Forwards IE Insp Rapt 50-263/62-0^ or Ha0703-OBa0 Wo
noncomp j i ance tinted
STREGTERj J F Civilian of Project S. Resident Progranu
LARSON. C E Northern Statas Power Co 2pp 1 57O3 &7S 3Af
Flche 50-E63, 83/O9/2S, 8210150385
IE Imp Rapt 50-2A3-/B2-09 on B20703-082B No roncomp 1 ianco
noted Major ar-ea* Inspected LER fol 1 oiuup. opeTational Jfotij
verification? fire protection/prevent! on, 1 e CUT I by personnel
qualificati on* operator overtiim* fc onslte revlaw commi tte;n
DfiQWH.C H , MADISON. A L , UALKER.lt D Division of Project &
Resident Pro era mi B2/O7/2B Spp 157O3 274 SAX
Ficho 30-263, SB/O-J/aB. B210I503B5
B3iO|301i)6 Confirmi
for 021011 meeting in Olen Ellyn, IL to
discuss proposed corrective action for cracli in uieti)*-
an indcap of reel rculation Loop A
SPEBQAHD.ft L Division of Project tc Resident Program* 32/10/05
LARSON, C E Northern States Polnor Co lp 15A73 053 S4X
Fiche 30-263, 92/10/OS, 92IOI 30JA6
0209190333 IE Info Notice 80-35, Supp 1 1, "Leaking fc Dislodged 1-125
Implant Stdi " Svc list encl
CODD.L I Oiviiicn of Fuel FaellitlBs, Materials & Safeguard!
S2/ 10/06 ConiollciaUd Edison Co of Ham Vor k tApp 1S7&1 330
24X Fiche 30-000.63/10/06,8208190233
6308190338 IE Bulletin 35-03, "Stress Corrosion Cracking in Thick-
Uall'Larg-Di moteri Stain leas B tnel p Ret irtru lation Syt
Piping at HWR PUnti " Svc list nel
DEYOUNO, H Director'* Office. Office of Inspection and
Enforcement 82/10/14 Con-io-1 Iriatcd Ed i ion Co uf Neu York
H5pp 1BB10.123 2-1X FJchrt BO-000,Qa/10/14,B20B19D33l3
0210230320 Confirmatory action tic re actions util uitll under tain as
result of 831O14 meeting at Region 3 oft r crack
indication* found on MB Ids on r ee irculation sys pipinfl
KEPPLER.J O fteglon 3j Office of Director 58/10/1? LAIRBON. C E
Northern SUt.l Puucr Co 2jip 15790 24 24 X
Ficht 50-263. B2/10/1 1 ?. B31025O320
8 Reportahl* occurrences, LERs b rolated -corr-eipondenc t
S210190174 Forunrtfs LEU 81-02O/03U-O
HAYEfi, L Ncrtharn BtJtns Pouir Co el/OB/24 KEPPLER.J O.
Region 3, Chicago* OfUcf at th Director CB1/OG/OI) [p
1S707 193 BIX Flchn aO-3AS.BI/Oa/atiBB10l3O171
B2 101 SO 180 LER B1-030/O3L-0 on 810734, main steam leak r live* led in
drain lini to condenser Cjuisd by pip Ing leaking irnmdiotlij
douni tmam of 43 dagrn* elbow tua to rasion Sc impingement
resulting from steam * tuater flow from raitricting orffic*
TDBIWpp rt Kortharn 6tatt Pouiar -Co 91/09/24 Ragion 3i
Chlcigo, Office of tli* DiTtctor (B1/03/O1) lp IS707 194. 24X
Fiche 50-263,81/08/24,8210130174
02100501132 PNO-II1-B2-103. on 820928, rail logrjph* of reclrculatl on loop
cap A rave* lid four cracks iitri)ing from u)el<T root Into
diacint hvat-affected lone. Mo through~ual 1 crack ing
aviilent Rap*ir proc*t/uret under evaluation
WALKER, R , JORDAN, H- Region 3, Office et Q it fetor 62/09/28 lp.
15403344 34JC Flch- 50-263, 82/09/28, 0210050102.
60
DOCKETED ITEMS
210090117 RO on B2O93B, crac t indication In end cap of A reeirc wlation
riser itanflr-ntad bij radiography Indication*. Initially
detected by ultrasonic turn during normal Initrvice lnp
Remedial meai ures under invest! gatlon
SHfiMLA.H A NorcKirn 8tates Pouer Co 82/09/23 KEPFLER, d
Raj ion 3. Office of Director Ip 15440 304 24X
Fiche 50-363, 93/09/39,0210030117
2100fiO2SB Forward* LER 92-QOB/03L-Q.
MUSOLF. D Northern Btatei Power Co B2/09/29 Region 3. Office
at Director Ip 1562) 067 24X Fictie 5O-263, B2/09/29, B2100403SB
-a21GOiiQ36Q LER 82-QQ9/03L-0 on 630330. RC 1C barometEr condenser cooling
mater supply valvE failed Cat) SB if by levered item due to
Retort motor operator torque suitch miiad ju-itment Valve ite<n
rep I at ad
WOJCHQUSHI, A V Nortnsrn Statit Power CD 62/09/29 Region 3,
Office at Direct oi- Ip 13621 06B 34X FUhe 50-363, 93/09/29,
3210060258
820929Q235 Public version of flevnion 4 to gsnerating Italian
emergency t I an corporate cammand ctr emergency plan
Implementing Procedure EOF-3, "Environ/Emergency
Coorif inator "
PAJDHBKI. J E Commonwealth Ednon Co 82/08/31 Jlpp
S3564 124 24X Fiche 50-000. Ba/Of/ 16, 9209270123
0210010009 Foruards info to suppl G207O1 request for eicmpllon Ifc
A par 620917 telcon Request applies to 8ections III Q y j,
It! 3 b r* installation of fire suppression ays
JJAUaCH, T J Commonwealth Edison Co 92/09/23 ElBENIlUr, IV
Division of Homing Bpp 1 5563 132 24X Fiche 50-000,
B2IOOJ0009
E2l<H2054i Releases public version of revised cover sheet to fttl
procedur es
FELTDN, J H Divif-lon of Rulei and Records 82/09/24 Ibcua
Kanagement Branch Ip 15672 219 24X Fiche 50-254, D2/OP/J 4
210190289 Foruards LER B2-016/01T-0
MUSDLF. D Northirn Statu Power Co 62/10/12 Rglon 3. Office
of Director Ip. 13742 173 24X Flchi 30-243,92/10/12.9310190309
-82IO190293 LER B2-016/01T-Q on BH092S, three indication! in 22-inch
diameter reactor reclrc ulation sjs mtr manifold and cap
cDnfirmed as rejtctable Caused t>) intiroranu lar streis
toTrnaion craeiirtj End cap to be r*plE*d
HAULER, S Northern States Pour Co B2/1O/13 R*gion 3, Office
of Director Ip 15742 176 24X Ficfi* 50-263,92/10/12,
6210190289
821Q12GS51 ForuiaTds public venion of revision cover
procedures Completion of encl checklut requested
KALJVIANAKrs.N Commonuiea] th Edison Co 03/07/15
lo full'
DPfice of Nucl*r Reactor Regulation.
EflX Fiche 30-334,82/09/24,0210120344
Director 6pp
8310150487 Forward! IE Imp Repts 50-351/82-14 !. 50-S(,3/i)H If. OK
370823-23 & O903 t, 09 No noncompl ianc e noted
KEPPLER.J Rafllnn 3. Office of Director 82/09/30 |||IO <
Commonwealth Ediion Co 3pp 15721 2EJ9 24X Tichi 50 J1H,
6310150437
OCKET 50-2A-1 DOW CHEMICAL CO
1 Inturanc* & indemnity information
3100-10331 Foruardi Endorssmenti 47 (, 49 to MEL I A Policij NF-160
Endorsement 47 amends deicription of fjcilitij to incJuile
Lark In Lab
COALHELL, T H Dou Chemical Co 32/09/29 BAtTZHAN.JD Antitrust
Si Economic inalijsil D ranch (Utility Finance) 3pp 15586 111 24 X
FicJie 30-264, 82/09/29,6210040231
Operating license stage document* & correspondence
S210150495 IE Imp f!epts 50-554/92-14 fc 5O-2t5/03-l6 on
0903 >j 09 Wo noncomp 1 lance noted Major areas inipecltd
emergency p rcp-aredneis eiepcise & licensee actloni an
previc-uilij identified emerijenig preparedness itcmi
PHILLIPSrH P Division of Emergency Preparedness fc (fpt
Support B3/09/29 I5pp 157B1 393 34X Fiche 3Q 9
B210 150497
63IO130376 Advise* that installation of offatte dose calculation IH"
program Pullg operational tracking model ti operation*]
A model will t> delayed until B31S31 to complete prlmi
computer initallatlon
EITARTZ,E D Coramonueal th Ediion Co 02/10/06 DENKlrMt II lim
of Nuclear Reactor Regulation, Director 2pp 15602 OVIt .'!<
Fiche 50-000,02/10/06,9310130376
210160020 Reipjond* to FOIA recount for IOVBH categorlnl of documents
re Dou Chemical Co & incineration tit 1 ou level raduaste
Raqueit for fee waiver granted Forwards Hated document!
FELTON, J H Divliton of Rulei and Record* 62/03/20 WILSON, A K\
Affiliation Untnonin Spp 13748 002 aflX Fiche 30-2A4, 93/OB/20,
82I01B002a
9210290047 Relsii public version of revislani to Quad CllL*i< Jloi
Dresden emergancij plan anneies ! revised generating
station emuT-jaiicij plan talephone directory
FELTON, J M Division of Ruin and Records B2/10/OR l)n<L*|-'
Kanaoement Drancli Ip 1S977 313 24X Fiche 50-006, Oa/IO/(lH
6^10290047
-82101002G9 Application far rntl of Hatl/Bupcoduct License!
Bl -00363-06, 2 l-OOa6S-Oai 21-00263-04. ai-002AB-0'7,SNM- 1253,
BTfl-327 t, fl-109 author! ring any ayproducl: ntatl batuiirt
Atomic Numb en 3 & B3, tplHum. Po-210 (, Am-241
HOVLE f H fi Dou Chemlial Co 73/06/35 2pp 15740 US
Fiche- H0-2fi4, BB/08/20, 92(0160023
Repcrtable occurrence*, UERs (c related
210290202 RO on B21006,mal Punctl on OP Eberllne AWS-ti contfnuoui atr
monitor pump cautad pump to be Inoperable for approx 1-h, Wo
Ion of significant slgnalt indicated Pump repaired Changes
to procedural or equipment under rvieu
RAMPV, L W, , KMOLLiF J Dam Chemical Co 92/10/BO HILLER.J R
Stand*rdii*tton d Bpgcial Projictt Branch Ip I5S93 394 24X
Fie lie 30-264, 92/10/20,821029020?
DCKGT SO-S45 QUAD-CITIES STATION. UNIT S
Eecurltvi medical, amirgencu ft firs protaetion plans
-" - "., *-__-_ ^_-,_, _ ^___^_ _ WM - ^^.^.i,..--
1209290125 fttleai** public version of reviitif fleneratinj station
emergency plan corporate comnand ctr *mirBncv plan
implement ing procedure
FLTON.J M, Division of Ruin and 1 Records B2/09/li- Document
Managaraent Branch IB. 13SA4: ISS 24X Fiche 50-OOOj S2/09/16,
8209590129
-8209290189 Forwards public version of Rtviiion 4 to genaratitig station
marjenicy plan corpOTJite command ctr Emergenc-n Plan
Implednntino Procedurs EOF-3, "Environ/rnai-j.encv
Coordinator." Receipt fora ncl
6210290060 Forwards public veriion of Revision G to Ouad CHI rt 1, J
emsrgtncy plan annsies. Revi i i an 2 to Dresden emorgtncj ptan
annsir Revis ior to Bijron emergencij plan annei b rfvlted
generatlni) itatEon emargencij plan telephone directory
MQtlREiR D Commoruaal th Edi*on CD 82/07/30 BnirOW.Uft w: -
No Detailed; Affiliation Oiven 5pp 15877 314 IMX
Fiche 50-000. BZ/10/OB, 0B10a90047
B2I0290077 Public version of Revision 3 to Quad Citln t. IUn
emergrncij plan annexe*. Revision 2 to Dresden ernei-tlnty plan
annei & ftevition to Byron energency plan annex
* Commonwealth Edison Co B2/0&/30 325pp IDli?7 UIV Ht
FIch' 30-000, 613/10/09,0210290047
a210B9000B Public version of revised generating station
telephone d Ire ctorij
OALLE.D P Commoninaalth Edison Co 82/00/12 4Jpf
24X Fiche 50-000.62/10/09.8210290047
l3Pf&
PAJdtJSKJ, J E CoiniDfHifealth Ediian Co B2/09/O1 CMTOM.H R
- Mo Detailed Affiliation Oiven Ip 19344-123, 24X
Ftch' so-ooo,
HRC
9210190753 Foruard* B207S2 1 tr re late subtnittals of tttrclU
scanaT'lai ft Failure to adhere to FEMA Outdance Hefna 17 If
FEKA ifoei nut observe exercise, of filte authorities ut 1 1 not
part IE t pat*
HINO.J, A Division of Emergencv Preparedness b OperaLional 8u*jn
B2/10/12 REE&, C Camtnoniueilth Edison Cn 2pp 13736 91' 341
Fiche 90-294,82/10/12,0210190793
B21 01 90740 Discuiies concerni re late submltfcals of (rm*rgi > i tt( ,
scenarios < failure to adhere to FEMA Ouidance Mima 17
Future iTciia not meeting Intent of advance notif icalion
guidance should be postponed or canceled
BREHeNV.P. J Federal Emergency Management Agency BSJW3S
KEPPLER.J O Region 3, Office of Director Ip 19736 S 341
Ficht 30-Z94i 32/10/12,8210190733.
DOCKETED ITEMS
61
62102B0361 Releases public version of revised emergency plan
implementing procedures
PEL TOM, J M Division of Rules and Records 82/1O/12 Document
Management Branch Ip 1585? 204 24 X Fichu 50-294. 02/10/12,
B2102BQ361
--B2102BO364 Forwards public version of revised emergency plan
implement ing procedures, me lud ing Procedures QEP 200-0 re
emergency c end 1 1 ions, QEP 2OO-I1 re emergency action levels &
QEP 330-3 re SPIMG control terminal operation
KQv~ACK, T 3 , GERNER, L F Commonuea 1 th Edison Co 82/09/23
DENrQN.H R- NRG - No Detailed Affiliation Given 3pp 15959 305
S4X Fiche 50-234,82/10/12,8210280361
0210230155 Forwards corrections to proposed Teh Spec Pages J 2/2 2-1
3 3/4 3-B, sup porting rivieu of future reloads i revised
Figure 3 5 1. Sheet 1, providing eitended MAPLHQR vs dlposuri
curves for barrier lead tet assembly fuel
RAUBCH, T J Commontuefllth Ediion Co 02/10/10 DENTON, H R Office
of Nuclear Reactor Regulation Director Epp 1 57BB 233 24X
Fiche 30-000, BS/IO/IB. 0210250155
8210250177 Errata It Addenda Sheet B.replacina Page 4-10 to "LOCA
Analysis Rapt for Dresden Units 2 i 3 t< Quad Cities 1 J. 2
Nuc 1 ear Pouer Stationi "
* General Electric Co NEDD-24146A EF1R 08 92/09/30 3p p
13708 239 24X Flch 50-000-83/10/10.0310230155
--Q21O2S0375 Public version of reviled emergency plan implementing
procedures, including Procedures QEP 200-O re emergency
conditions. QEP 200-T1 re Emergency ac tior, levels t OEP 330-3
re SPING control terminal operation
* Communuiealth Edison Co B2/09/23 2lpp 15959 207 34X
Ficho 50-254.83/10/12,9210200361
9210250069 Provides add 1 infd re reactor mater cleanup room area temp
monitors Temp elements cause no automatic plant response
beuond control room alarms
RALJBCH, T J Commonwealth Edison Co B2/10/19 EISENHUT.D
Division of Licensing 2pp 1 57B7 001 24X Fiche 50-000.93/10/19,
8210250067
521022-0359 Provides info re organnation * performance of depta
responii&le For radiation protection ac ti vi ti es, per 820702
cominl "-men* Training coordinator assigned in Apr 1902 to
improve fiEalch physics training programs
TRrtMrt. T R Commonuealth Edison Co B2/1O/14 DENTQN, H R Office
at Nuclear Reactor Regulation, Director ?pp 15776 297 S4X
Fiche 50-000. B2/1Q/14. 9210230339
Inspection report!, IE Bulletin* i correspondence
9210150487 Forwards IE Insp Rep ts 50-294/02-14 t. 50-265/82-16 on
820023-25 tt 0903 d 09 No noncomp 1 iance notad
KEPPLEft.J Region 3. Office of Director 92/09/30 REED. C
Commonwealth Ediion Co 3pp 15731 2B9 B4X Fiche SO-254. 82/09/30,
82I01S0407
B21025Q3Q9 Responds to 820917 telcon request for info re fire
protection safe shutdown rcpt I terns 2 fr 3 are preliminary
resul f a, Bill) j to revision following engineering review
RAUBCH, T J Commonwealth Edison Co 82/10/10 EIBENHUT, D Q
Division of Licensing opp 15790 213 24X Fiche 50-254,02/10/18,
8210250309
P Operating license stage documents ti correspondent!
Q2LOOE0142 Requests that charcoal ad&orbcr F&1-DYH3 be counted, within
S LJ|B or rece ipt, decay corrected to 790319 levels &
returned Liquid beta analyse* results received in NRC
B2Q917 Itr ui 1 1 be incorporated in rept addendum
PAPER 1ELLD, C J Division of Emergency Prep aredness ti Operational
Support 93/09/20 KALIVIANAK IS, N Commonweal th Edison Co Ip
L36O5 167 21X Fiche 50-231,83/09/29,0210090142
02 101 20 105 Requsts delay of implementation due dates re NUnEO-0/37,
Items It D 2, "Plant Shielding," II D 3, "Post-Accident
Sampling" fc I I F 1 1. "Noble Oat Effluent Monitor "
SWARTZ.E I> Commonucallh Edison Co B2/IO/04 EIEENHUT. D Q
Division of Licensing 5pp 15651 337 24X Fiche 50-000,82/10/04.
BS10I3010S
9210150495 IE Imp Repts 50-254/S2-14 (< 50-269/02-li on 830923-25 S.
0903 tt Of Ho noncompl lance noted Major areas Inspected
emergency preparedness eierclse it licensee actions an
previously Identified imergency preparedness items
PHILLIP8.M P , SMITHiH J , AXELSQN, W L Division of Emergency
Preparedness ti Operational Support 92/09/29 ISpp, 19721 292.
24X Fiche 50-254, 8H-/09/30, 8210150407
B3 100603 5 9 Ack receipt of 8307 1O Itr Informing WJ1C of steps taken to
correct violations noted in 1C Imp Repts 90-237/01-39,
50-249/91-32, 50-2B4/B1-23, 90-265/81-33, 50-395/B1-31 fc
30-304/01-39
SPESSArtD, R L Division of Project (< Resident Programs B2/1O/01,
REED, C Commonuealth Edison Co Ip ISilB 394 24X
Fiche 50-000, 9E/10/01 , B210060359
8310060367 Respond* to NRC 820712 Itr re violations noted In IE In op
Repts 50-237/81-39, 30-249/81-32, 30-294/01-23, 50-363/01-23.
30-295/91-31 * 50-304/81-29 Corrective actions training for
mat priorities re plant ava i 1 abili tij lull 1 be conducted
REED.C Commonuiealth Erf i ion Co 82/09/10 KEPPLER.J.O Region
3. Office of Director 13pp 1S61B 355 24 X
Fiche 50-000,02/10/01,0210060359
(1210360526 Forwards Revision 3 of Chapter 9 of "Offsite Dote
Calculation Manual "
GOLDEN, J C Commonuealth Edison Co 82/10/06 CASE, E Office of
Nuclear Reactor Regulation, Director Zpp 15805 137 24X
Ficlie 50-000,83/10/06,3210260526
52102605^2 Revision 3 of Chapter 9 of "Offsite Dose Calculation
Manual "
> Commonuealth Edison Co 92/09/30 93pp 13005 13? 34X
Flche SO-OOO, 02/10/06, 9210360926
52LQlBOu5<? Provides addl guidance t clarification re 020806 request
for addl info per NUREG-O737. Item II H 3, "Post-Accident
Sampling Eifs " Detailed reliability analysis not required
to satisfy NRC concerns
CflUrCHFIELD, D Operating Reactors Branch 5 03/10/09 DELOEORQE, L
Commonwealth Edison Co 3pp 24X Fiche 50-000,82/10/00,0210180039
B2L019O7BO Foruards "OE BUK Eitended Load Line Limit Analysis for Ouarl
Cities Nuclear Power Station Unit 1, Cycle 7 & Unit 2, Cycle
6 '
RAUBCH. T J Commonuiealth Edion Co B2/10/12 EISENHUT, D O
Division oF Licensing Ip 15736 206 34X Fiche 50-S54, S2/ 10/13,
B210 190760
-- B2101907B5 "O OUR Eitended Load Line Limit Analysis far Quad Cities
Nuclear Pouer Station, Uni t 1, Cycle 7 fc Unit 2, Cucle 6. "
Ooneral Electric Co NEDO-23192 02/07/31 31pp. 15736-207
2-1 X Fiche 50-234, 82/10/12, S31O1907SO
S210190445 Foruiaril* supplemental response to Oeneric Ltr 92-03 re
implemintation status of NUREO-0737, 1 tems II B 3,11 F 1 Z,
II F 1 3i II F 1 5 !t II F 1 6, in response to 821006 request
SWARTZ, E D Commonuealth Edison Co 02/10/14 EISENHUT, D O
Division of Licencing 9po 24 V Fiche 50-000,02/10/14,8210190445
8210050170 Forwards listing of piping lys which fall to meet FBAR
requirements, pr NRC 800919 confirmatory action Itr IE
Bulletin 79-14 operabllltu. evaluation updates uiill not be
provided for Dresden t> Quad Cities Final update by Dec 19BS
RAUBCH, T J, Commonuaalth Edison Co 03/10/01 KEPPUEH, J Region
3, Office of Director 6pp I5640'199 24X Fiche- 30-000, B2/10/01,
8310080179
9210060366 Confirms 621103 enforcement conference at Region 3 ofc re QA
aspects associated id/procurement, intell*tion ti use of
non-qualified valve guides in electramagnat ie relief valvel
at facilities
8PE9SARD,R L Division of Project d Resident Programs, 92/10/04
RECD,C Commonwealth Edison Co Ip 15640- 1B1 24 K
Fiche 50-000, 82/10/04-, 0210090-190
0209190233 IE Info Notice 90-35, Sup pi 1, "Leaking k Dislodged I--123
Implant Beeds " Svc list encl
COfiB.L I Division of fuel F*cilitin, Material! t< Safeguards,
03/10/06 Consolidated Edison Co of Nvui York 66pp 19761.330
24X Flehe 50-000,82/10/06,8208190233
B20ai9023B IE Bulletin 62-03, "8tre Corrosion Crocking In Thick-
Mail, Large-Diameter, Stainlns Steel, Racirculatlon BIJS
Piping at DWR Plants " Svc list end
DEVOUNO.fi C Director's Office, Office of Inspection and
Enforcement 82/10/14 Cc-niol Idflted Edison Co of Neu York
115pp 19010-129 24X Flcht- 50-000, 83/IO/ 14, 8209190239
R Periodic operating riportt b related correspondence
9210130396 Forwards raontMv operating rtpts for Bept 1702,
KALIVIANAKIS.N Comnonujealth Edison Co 02/10/01. Director's
Office, Office, of In*p*ctlon and Enforcement Ip. 15680339 24 X
Flche. 30-234, 03/10/01,8210130396.
0210130390 Monthly operating rept* for Bept 19B2
BUBS.R.D CommonuiBalth Edison Co 82/10/04 !3pn
24X Fiche. 30-234, 02/10/01, B21013030A
1S4BO 341.
62
DOCKETED ITEMS
S Reportabl* ot currences, LER* & related correspondence"
3210360467 PHO- 1 1 1-82-1 12 uttl notified that high density fuel storage
racks initallcd do not meet design criteria for spacing due
to buying condition Manufacturer reanalyied seismic rfsponiir
of raclt k concluded bound instance acceptable
GROHE. J . HALXft,R . STREETER.J fcsaion 3, Office of Director
B2/1Q/18 Ip 15B06 237 24X Fiche 50-254,82/10/13,8210260407
DOCKET 30-31,1, POINT BEACH NUCLEAR PLANT, WIT 1
F Security, medical, emergency & fire protection plans
0210120267 Foruardi documentation re steam generator roplactminl
application filed prior to 820919 estab 1 1 shment of ABLD
Documentation consists of (team generator repair repti A
correspondence betuaen licensee I Commission W/o encl
RIIlOWflV.DA Shaui Pictman. Potts S, Troubridfle IHDOIJAV.DA
Wisconsin Electrlt Power Co 32/10/07 KLINE.J I! , PrtXTQN.H f
Atomic Safitg and Licensing Board Panel 3pp 15655 32? 2 + x
Fiche 50-266,82/10/07,8210120267
B21O2O0027 Notice of B21117-20 evidentiary hearing in Tiuo Jlivtrv,UlT (
adequacy of iniervice nondestructive testing of sloevei
proposed to be used to repair corroded steam generator
tube* Prehearing conference to be held after hearing
DLQCH, P & Atomic Safety and Licensing Board Panel G3/IOYIS Ip
15756 323 24X Fiche 30-266,82/10/15,8210200027
831004011*7 Discusses r vision of plant emerjenc-y respons-e procedure;
specifying meet nary precautions required before post-
accident re-entry into auxiliary bid; or facade, In reiponie
to 920914 request for Info rr NUREQ-0737, Item II B 2
FAV.C U Uis.conein Electric Power Co 02/09/24 DENTOM, H R
Office of Nuclear Reactor flegul at( on, Director CLARK, R A
Operating Reactors Branch 3 2pp 15581 301 24X
Fich 50-266,62/09/24,8210040119
B21O2O0055 Response to HI Environ Decada 820928 araenil to potman
Intervene Decade eitabllihed standing but affiant P Andsnon
must demonstrate -authority to act on behalf of Decade
Certificate of Svc encl
BACHMANN.R O , HCCURREN, H J Hearing Branch 1 82/10/10 rtl
Safetg and Liceniing Hoard Panel 4pp 15753 OO6 24 K
Fiche 50-266,82/10/15,8310200053
8210090272 Forwards addl info requested in NHC 820916 telcon to
support util 820630 App K piempti&n requgit Eight oversli
draufngi encl Ap'rtura cards are available in PDF?
FAViC M Ulsconiin Elictrlc. Pouier Co 02/09/39 DEM TON, H R
Offici of Nuclear Reactor Regulation, Director CLARK, P, A
Operating Reactari Branch 3 !3pp 13&06 047 24X
Fiih 30-266, 33/09/29, 83J005027B
8210030054 Faruardi eddl info rs proposed moils for emergancij Djppart
ctr
FAV, C M Uisconun Electric Power Co, 2/09/30 DEHTQH.H R
Office of Nuclear Reactor Regulation, Director 16pp 15403 32 B
24X Fiche 50-366,82/09/30,0210050-054
S21027O256 Rele*i public version of riviied emergency plan
imp lamenting praceiluriG
FELTQN, J H Division of Rules and Records B3/10/OB Document
Manajiment Branch Ip 1 SB3H 001 24X Ficlie 50-266,62/10/09.
6210270256
B210270259 Foriuardi public vrlon of revised emergencij plan
Implementing prooduro, including Procedures EPIP I I rr
initial clastif icatJon^ EPIP 1 3 re eitlmation of source
term 4 EPIP I 4 re radiological doie evaluation
FAV.C M Wisconsin Electric Power Co 83/09/10 DENTDJJ, H I!
Office at Nuclear Reactor Regulation, Director CLARK. B A
Operating Reactor* Branch 3 4pp 13834 002 24X
Fiche 30-266., B2/10/OS, B210270236
82102702-61 Public version of revised tm urgency plan implementing
procedures, including Procedures EPIP 1 1 re initial
c lasiif cat ion. EPIP 1 3 r estimation -of source term b
EPIP 1 4 re radiological dole evaluation
* Miicon*ln Electric Power Co 02/09/10 244pp 19834 006 24X
B2I0190471 Fopuards aifdl info re 620630 request* for eiemption from
10CFR50 Apo R concerning Fire Area ?, control room l>
vertical cable tray*, In reipons* to 821001 & 06 telcons
w/NRC H/16 nverilie drauiingi Apirture cards in PDR
FAY.C W tjlsconlini Electric Pouer Co 62/10/11 DENTOH. H,R
Off it* of Nuclear Reactor Regulation, Director CLARK, fl A
Dparatlng Reactors Branch 3 12pp 19734 390 24X
fich>;50-266, B2/10/11, B2101S047 1
Adjudicator^ E or T tip and* nee
6210250120 Notice of appearance in proceeding CertiFicati of !tvc
ANDERSON, P Wiiconiin'1 Environmental Decade 82/10/20 Jp?
157&7 116 24X Fiche 50-266,82/10/20,8210250120
8310220242 Notice of relocation of 321117-20 hearing front Tun IHvin I,
to Hilwaukee, HI Limited appearance statements will be tltin
at original location on B21I17
BLOCH, P B Atomic Safety and Licensing Doard Panel 83/10Y31 !|
1S775 351 24X Fiche 50-266,82/10/21,8210220242
G210EaO406 Ack receipt of B21Q1B Itr requesting document! Ul i L uk 1 1
cooperate but is not required to respond since nonpsrtlti
not entitled to discovery
CHURCHILL, B U Shau, Pittman. Potts b Troubridge B3/\0/ys
ANDEHBOW.P Wisconsin's Environmental Decade 3pp ISD03 lit Ifi
Fiche 5O-2&6, 82/10/22,8310260406
8210280253 Advises that utii requested to send FSAR Chapter 14 "!!*lrt|
Analv>" to UI Environ Decade, in ref to B21018 telcon S-vt
Hit encl Related correspondence
CHURCHILL, B M 3haui, Pittman, Potts b Troybridge CItUJICHILI , U U
Wilconsin Electric Power Co B2/10/25 ANDERSON, P Hitconiin'i
Envlronmintal Decade 2pp 15839 027 24X Fichu 50-26-6,113/10^*
8210280293
K Utility Final Safetij Analysis Report (FSAfi) t, amends
82Q7S90S57 Chapter 4 to Point Heach updated F9AR, "RGB "
* UlBconiin EUctrlc Pouier Co 83/07/21 102pp 14921 074
Fiche 50-266, 83/07/21,0207290337
B207H90279 Chapter 11 to Point Death updated FSAR, '
Radiation Protection St| s "
Wisconsin Electric Power Co 82/07/21 126pp
Flehe 50-264,82/07/21,8207290279
P Operating license stag* documents b correspondence
B210210O09 Rtcotnrnends rivieu of design of InterconecLion- bitwifn
redundant safety-related electrical load group* Design
ihoilld be modified to assure full compliance u/Fteg OuliTi
I A
MICHELBON.C Director'! Office BO/ OB/27, DEN TON, If R DirecUr
Offlc-e, 2pp IS7B2 208 24X Fiche' 50-066, BO/OH/27.
8310040123 Amen* to MI Environ Decade 820810 petition to intervene
including affidavits requesting HI Environ Decade to
intervene on affiant behalf Certificate of Svc encl
ANDERGON, P MUconsin's Envf ronmintal Decade S2/09/2H
CommiisioneTS Spp 1S581 196 24X Fiche, 90-266,82/09/291
82 10040 I 33
S2100IOOOB Responds to FOIA request for 19 categories of dacuitnli
nuclear reactor events t safety problems Forwards docunentl
lilted In App A
FELTON.J H Division of Rules and Records 82/06/SO UDGLU-B
Critical Mass Energy Project ISff 15787 005 24X
Fichi'9O-000, 82/06/28, 821 0010008
B21Q050251 Mimorandufl i, order granting sunrnary disposition of ill UI
Environ De*de iisuei ircept issue of deinonstration of
adaquicij of eddy current tutltij to detect cr*cliiiig
ELDCH.P . KLINE.J R . PAXTON.H C. Atonic Safety and Liceniins
Board Panel. 52/10/01. Wtscontln's Environmental Decade. IVpp
15610 304. 24K Fiche 80-266, 02/10/01, 8310090251
8002I40K04 Foruardi evaluation of proposed Tech Specs change ta |T
facility at 225O or 2000 psla Proposed changes are
acceptable H/o encl
CHECK, P S. Reactor Safety Branch 79/12/26 BCHUEMCEH. A
Operating Reactors Branch 1 (Pre B004SB) 6pp 13727.030 311
Flch* 30-OOO f 82/06/29,8210010008
B21009027B Decision ALAB-6VA affirming ASLB B11I05 order, permitting
plant to return to sv= aftir refuelino outage during uhlch
lle*ni (tanned t repair degraded ntitn generator ou
sleeving
TOMPKINB,B A, Atonic Bafetu and Liceniing Appeal Panel SB/ 10/01.
3'pp 18611:197. 24X Fiche' 80-844, S2/W/01, 8210030875.
BE 100-700 07 Responds to FOIA request for eight categories of riear
team generators ^ steam turbines, App A documents provided
in R Udell FOIA Ruqueit 31-313 Forwards documents llt*d in
App B
FELTQN, J.M, Division of Rules and Records 92/08/10 LOW. D
Winthropi Stimian, Putnam d Roberts 9pp 15645 063 S4X
PJch*- 90-000, 83/08710,8210070007
DOCKETED ITEMS
63
-79I22Q02B5 Summarifes steam generator tube leak on 730920 fc inap
Ledt rate reached 560 gpd at 5 OO AM, caused by two
tubes u/cracks located ui/in thickness of tube sheet k one
tube u/leakij plug General cause plant conversion to AVT
riQQNMi. V S Engineering Branch <Pre 79103O) 70/12/12
GRIMES. Q K Assistant Director for Engineers & Projects (Prs
79O635) 2pp J5645 2-14 StX Fiche 5O-OOO. 02/OB/ 10, B3I00700Q7
-8310070205 Submits summary of findings & comments re facility stoam
generator tub* leak incident t insp riiulti contained in
Annual Optra ting Rept 1974 flecoiwnends that licensee bo
requested to submit insp program for neit scheduled insp
BHAQ.L C Engineering flranch fPr 791030) 77/07/25
EISENHUT.D Division of Operating Reactors 2pp 1564S 235
24X Fichs 50-000,82/08/10,0210070007
-7907200103 Diitusses steam generator tube leak fc inservice insp Stsan)
jener-ator caused by deep crevice cracking of three tubes
uithiJi tube sheet Hot leg tube tests indicated 52 tubes u/
deep -crevice cracking in eicess of 5QX plugging limit
t: V S Engineering Branch (Pre 79IO3O) 79/08/17
T. ff Division of Operating Reactors 3pp 15645 554
24X FicJie 5O-GOO,82/OB/10,82lOQ7Q007
-EQ0430Q6I6 flequasts that util provide BNL tn/tube samplei For
eiarninaUon Forwards iist of tubes
HJQNAN, V S Engineering Branch BO/04/14 SCHWENCER, A
Operating Reactors Branch 1 (Pre 80042B) 2pp 15615 366
Fiche 50-000, B2/OB/1 0,621 0070007
fetij evaluation of Aug 1980 steam generator insp
mai| be operated safely per 791130 t>
-00090-1 01^3 Forwards
Cnnc]ud4?s generat
BQOI03 orders
PAULICiU.S S Materials Engineering Branch BO/OB/OB CLARK, H A
Operating Reactors Branch 2 IP 15645 307 24 X
Fiche 5O-OOQ-,S2/OB/ 10,921 0070007
-eOQ9Q4O4'J7 Safety evaluation supporting operation of steam generators
per 791I3O A B001O3 orders
Materials Engineering Branch 8O/08/OS 7pp 15645 310 H4X
Ficfie 50-000, B2/OS/IO, 6210070007
-8210070203 Forwards request for add! info re 780524 staam generator
tuba leak, per LER 78-010/Q1T-0 LER does not clearly
indicate evaluation of exact location
* Engineering Branch (Pre 791030) 7B/07/13 SCHWENCER, A
Operating Reactors Branch 1 (Pre 770633 > 3pp 15645 341 24X
Fiehe 50-000. B2/OB/10. 8210070007
-B210070217 Eiprasses appreciation for 771130 effort to perform
etsintlal licensing work an steam generator matter
EISENHUT.O Division of Operating Reactors 79/12/03
TRAHMELLiC M Operating Reactors flranch 1 (Pre 800438) If
15645 2S7 24X Fiche 50-000,93/08/10.8210070007
-8210070218 Forwards A Sequencer *< CM Trammell statement* re 791116
LEI) 79-017, per 791228 request
SCHHENCEfl.A Operating Reactors Branch 1 (Pra 80042B) 79/12/31
EISENHUT. D Division of Operating Reactors ipp 15645 353
24X Fich 50-000, 82/08/10, BB10070007
8210040414 Poruards Amend! b3 b 68 to Licenaes DPR -24 b DPR-27,
rispec tivtlg, saf ety evaluation & notice of issuance &
availability Amends revise incervice inlp Tech Specs
CUARK-R A Operating Reactori Branch 3 82/08/31 FAY.C W
Wiiconsln Electric Pouer Co 5pp 13577 134 24X
Flch* 50-266,82/08/31,8210040414
-8IIO39005O Advises that technical rovieuiers providing input for BEH
,nust ttf available to testify Jt 811029-31 hearings Schedule
', ajtinda info one 1
CLrtHK.R A Operating Reactors Branch 3 SI/10/20 MURPHY, E .
CEHEMlAS. J i MD, T NRC - No Retailed Affiliation Owen 3pp
I5643 271 24X Fiche 50-000.03/08/10,6210070007
8210040420 Amends 43 !, 69 to Licenses DPR-24 k DPR-27, r eipect ivalu,
reviling language of Tech Specs re Inservice Insp
requirement s of safety claig components to conform
U/10CFR3Q 35
CLARK, R A Operating Reactors Branch 3 83/08/31 16pp
15597 139 24X Fiche 50-266,82/08/31,8210040414
Wcnueats evaluation by 811023 of utll 810702 application for
license amend to permit steam generator tube sleeving Info
to be presented at ASLD 811029-3O hearing
COLBUflN,T Operating Reactors Branch 3 81/10/19 BALLA.HD, R L
Environmental Engineering Branch Ip 15643 270 24X
Fichu 50-000,02/08/10,8310070007
-U111OV0062 Forwards safety evaluation for proposed steam generator-
slee-vtng demonstration covering radiation protection 6
At CiFTrt a;pec ts
HflEOEB.itJ E Assistant Director for Radiation Protection
31/10/3.2 NOVAK, T A Assistant Director for Operating Reactors
4 pp. 156*5 276 24X Fiche 50-000,82/09/10,0210070007
-811I2'1QO71 Submits review of utll request to demonstrate tube sleeving
program Activities of proposed demonstration will not result
in on<j significant environ impact
BflLLARD.fi L Environmental Engineering Branch 81/10/23
CLARK, F! A Operating Reactors Branch 3 Ip 15645 S80 24X
FicJie 50-OOO, B3/OB/10. 0310O700O7
-B2Q.2I20129 Discusses environ review of application for steam generator
tub-e sleevifio program Environ impact insignificant
OALLARC.fi L Division of Engineering 82/01/25 CLARK, R A
ape-rating Reactors Branch 3 Ip 1564S 2B2 24X
Fiche 50-000. B2/OS/10, 8310070007
-8210D70LB5 Responds to 750320 question concerning 1 iteming action re
'jcilftij steam generator tube rupture Incident W/a encl
prellminari) results af tube insp performed bo 1 iceniee, Tech
Specs. & related info
GOLLEd, K R Division of Reactor Licensing (NHR-1973 only)
/5/03/3I OALLO, J Hearings Division Ip 13645' 201 21X
FichB 50-000.32/00/10,8210070007
-B210O701B7 Informs of incorrect Info contained in third paragraph at
End 3 to 7SO331 memo re facility itaam generator tube
rupture incident Corrected paragraph submitted
COLLEH-K A Division of Reactor Licensing (NRR-1975 only)
VS/Ot/O 1 ? QALLO, J Hearings Division 2pp 18645-202 S4X
Flclit 30-000,92/00/10.9210070007
-9210070191 Requests technical assistance re 730S26 steam generator tube
teakagit incident Revieu of end Info & current regulatory
requl rem*ntt re (team generator tube integrity requested by
750530 H/0 ends
LCAR.& Division of Reactor Licensing 1NRR-1979 only) 7S/O4/1B
ECHROEDER,F Division of Technical Revieu (NRR-1979 only) 3pp
15643 204 24X Fiche 50-000, 02/OB/10i SS10070007
8210040435 Safety evaluation supporting Amends 63 fr 6S to Licenses
DPR-24 & DPR-27, respectively
* Office of Nuclaar Reactor Regulation, Director 82/08/31 4pp
15597 153 24X Fiche, 80-266, B3/OQ/31, 831004041-1
8206210571 "Point Beach Nuclear Plant Units 1 t 2 Intarvica Insp
Program Tachnical Evaluation Rept "
Science Applications, Ine NRC-03-S2-096 SAI-1B6-08Q-B8
82/06/19 NRC - No Detailed Affiliation Qiveti 20pp
15597 139 34X Ficlie 50-S66, 82/08/31, S210040414
0210040427 Notice of lisuance It availability of Amends A3 & 68 to
Licenses DPR-34 & DPH-27, respective lij
CLARK, R A Operating Reactors Branch 3 82/09/31 3pp
1S597 179 24X Fiche 50-346, 02/08/31 , 8210040414
8210050005 Advises that error analysis of reactor vessel uater level
instrumentation sys requested in NRC 020617 Itr uill be
4V>ilbli by 630119
FAV.C H, Uitconsin Electric Power Co 82/07/29 DENTON, H R
Office of Nuclear Reactor Regulation, Director CLARK, R A
Operating Reactors Branch 3 Ip 15609 208 24 X
Fiche 50-366,82/09/39,6210050005
8510050055 Foriuard* info requested In NRC 82063O Itr re implementation
of THI Item II D 2. "Poit-Accl dent Sampling 0ys " Arfdl
rvquirements re backup pouer sources for lab are beyond
scope of original NUREO-0737 implementation schedule
BURSTERS Mlicontin Electric Pouer Co 02/09/30 DENTON, H R
Office of Nuclear Reactor Regulation* Director CLARK, P A
Operating Reactor* Branch 3 31pp 15603 307 34X
Fiche 30-266, 82/09/30,02100500)55
8310050233 Application to amend License* DPR-24 |> DPR-27. revlting *pent
fuel pool poison lurveillance specimen location b clarifying
conditions for operating power operated relief valve*
FAY, H Hi >c or .in Electric Pouer Co 82/09/30 DENTDN.KR
Office of Nuclear Reactor Regulation, Director, 3pp 1 3409,056,
24X FiChe.50-B64. B3/O9/30, S21OOS0332
8210050331 Proposed Tech Bpect revising spent fuel pool polton
surveillance specimen location fc clarifying condition for
operating i over-operated relief valve*
* Ulsconiln Electric Pouer Co, 82/09/30 3pp 19609' OS?
Fiche 80-266, B2/09/30,82100&OS22
84 X
64
DOCKETED ITEMS
S2102?0fl26 Forwards Amsnil 44 & 69 to Llcnin PPfl-34 t DPR-27,
reipect ivelij, saf ty evaluation fc notice of iisuance t<
aval lab iH tij Amends modify operation & survei 1 1 one* teiting
requireminti of containment purg ivpply t eihaust valves
COLBURN, r operatina Reactors Branch 3 B2/10/04 FAY, C W
Hiicnnsin Electric Power Co 4pp 159*3 143 24X
Fiche S0-26t, 82/10/04, B2102W436
9210290431 Amends 64 1 69 tP Llceniei DPfi-a4 b DPH-27, r-nspec t ively.
.Codifying operation t. surveillance teting requirements of
containment .purgn supply i> e-ihaust Isolation valvei t<
terminology of Tetfi Spec 15 4 4 on luting
CLARK. R A Oparatino Realtors Branch 3 Ba/10/04 12pp
I5B63 154 24X Piths 30-246.82/10/04.6210390426
B21Q290436 Safety evaluation supporting Amends 44 & &9 to LicansM
O-PH-24 t DPR-27. respectively
* Office of Nuclear Realtor Regulation Director 33/10/04 5pp
13B63 I4b E4X Fiche 80-266, 02/10/04, B2I029Q436
B210290441 Notice of Issuance t, availability of Amends 64 t 69 to
Licenses DPH-24 t DPR-37, respec ti vely
CLARK. R A, Operating Realtors Dranch 3 fla/10/04 2pp
lSBd.3 131 24X Fiche 30-246.83/10/04.6210290426
921Q2AQQ79 Proposes 1 Tech Spec changd incorporating reviuoni rt
ariminis trat iv control of high radiation areas
Uiscontin Electric Pouer Co 02/1O/I9 Ip 15B06 239 ^^
Fichf 50-266. B2/10/I9. 6210360476
82103130295 Application to amend Licinse* DPR-34 t DPR-27. changing Ti[i
Specs re r*q.u Inments for periodic leakage rate testing at
containment airlock doors Class I !, II amend fees end
FAV.C H Wisconsin Electric Power Co 02/10/21 DENrQN.H B
Offict a! Nuclear Raactor Regulation. Director 3pp 1SB37 273
34!>: Fiche 50-266. 62/10/31 . 82102a02?5
--S2102B029a Tech Spot Change fienuest B2, changing requirements For
periodic leatage rate testing of containment air locfc doors
t IMiconsln Electric Pouer Co 82/10/21 4pp 13B37 275 341
Fitht 50-366,02/10/31.6210300295
8210290294 Provides results of confirmatory analysis demonstrat Lng
that unacceptable radioactive release from containment
uauld not takt place as result of ima 1 1 break LOCA in uhich
ajitrator action required Kailioactlv release negligible
FAY.C M Wisconsin Electric Power Co B3/ 10/22 CLARK, R A
Operating Reactors Dranch 3 Ip [5853 135 24X
Ficho 90-266, B2/ 10/33. 3310390294
0210130267 Foruardi documentation re steam generator replacement
application filed prior to 620919 establishment of ASLB
Docunantat Ion conslatt af qteam generator repair repts d
corre-iponiience be>tuoen licensee ft Comini s i o n H/o encl
RJDOHAV.D A SNaiu, Pittmaiu Pott* t Troubr Idge. RIOOWAY.D A
Wi*cc-nin flectric Power Co 82/1O/07 HLING.J R , PAXTON. H C
Atonic Sdfitif and Licencing Doarif Panel 3pp 13652327 34X
Fiche 30-266,62/10/07.821.0120367
B210150430 Advns that refuelins Bftutdouin at end of Cucle 10 planned
to begin 821022 Startup of Cucle II e-ipected to occur in
early Dec 1932 Cycle 11 reload core designed to operate
under current no-nlnal design parameters & Tech Sftct
FAY.C H WlBcomin Electric Pomer Co S2/ 1O/1J DENTOM. H R
Office of Nuclear Reactor Regulation, Director CLARK, R A
Operating R&actors Branch 3 2pp 13704 O19 ?4X
Fiche 50-246, 62/ 10/1 1 , 82IOJS0430
62101902S4 Advises Dp mod to HC3 gas vent sy > to prevent operation of
pouer operated valves ifuring normal plant operation' per
921019 telcqn Physical rettrjining de-vice fitted on or over
valve operator sutteh
FAV.C W Wisconsin Elffctnt Pouer Co 83/10/15 DENT OH, H R
Office of Nuclear Reactor Regulation, Dime tor CLARK. R A
Operating Reactors Branch 3 Ip 1574S 177 24 X
Fiche 50-266, 82/1O/13, 921O1TO2B4
Inspection reports. IE Bulletins ! correspondence
0107270156 Forwards addl info in response to IE Bulletin BO-H re
rcasanr-v ualli Thirteen repti & 109 oversiie drawings end
Aperture cards are available in PDR
FAY.C U Wisconsin Electric Power Co 81/07/17 DENTOH. H R
Office of Nuclear Reactor Regulation, Director CLAHH. H Dj>raiirj
Reactors Dranch 3 I9pp Available at NTI5 09151 02i SIX
Fiehe SO-36A. Bl/07/17, 810727O1 56
-0107270161 "Modal Contribution to Dynamic Analysis Results "
n Computech Engineering Services, Inc R553 O.J 01/O7/31
091S1 043 24X Fiche 90-266,01/07/17,8107270196
-9107270166 "Cyclic Loading Tests of Masonry Single Pier*,Vol I - Hi:j
to Width Ra tlo of 2 "
HIDALOO.P A . MAYE6.R L. , MCHIVCM.H D California, Univ o(.
Berkeleu UCD/EERC-7Q/27 V01 70/11/30 I41pp AvailaEilt at
NTfS 09151 15B SflX Fiche SO-266, Bl/07/1 7, SI072701 56
-9107270149 "Cyclic Loading Tests of Masonry Singlo Piert.uol a -
to Width Ratio of 1 "
CHEN. B J HIDrttOOi P A . MA YE 5, R L California. Unlv of.
Berkeley UCD/EEnC-70/28 V03 7B/ 12/31 lOflpp 07151 Sfff
Fiehe 50-366,81/07/17,9107270156
B210190519 Foryairdi responses to request for addl Info on Tech
Cnange Request S3 re operation uihtn addl steam generator
tube plugging causes primary sus flaw to drop below thermal
dailgn flow value
FAViC H Uliconitn Electric Power Co B2/10/15 DENTDM, H R
Office of Muclieal- Reaefcor Regulation, Director CLARK, R A
Operating Aeactor-c Branch 3 3pp 15751 23B 24*
Fiche HO-S66, 02/10/15,8210190519
821027029^ Forwards Amend* 65 fc 70 to Licenses DPR-24 b DPfl-27.
reipectiveliji safety evaluation & notice of issuance d
availability Amend allous r-elaiatlon of monthlg turbine stop
tt governor valve tests during end of cycle operation
COLBURN.T 0, Operating Reactors Branch 3 02/10/13 FAY<C
Wiitoniin Electric Pouer Co 3pn 19936 316 24X
Liceniei DPR-24 ti DPR-27. respect ively.
nthlu toraine stop & governor valve
operation,
Branch 3 02/10/15 7ff
S.B21 0270294
L i Licenses
Spp
-BIQ7270I74 "Cyclic Loadlnj Tosts of Masonry Single Piers, vol J - ^n 1
to Hidtlv Ratio or 3 "
HIDtt-GO, P A , MAVEB.R L , MCNIVEN. H D California, Unlv at'
G*rkiU(t UCO/EERC-79/12 v03 79/05/31 I54pp Avllahl li
NTIS O7152 134 24X Fiche 30-366, 01/O7/17, 0IO727O1 56
-SI0727O178 "Shaling Table Btudy of Single-Story Masonry Hjusf*> u o! 1
Test Structure* 1 ( 2 "
OU.KAN.P , KAVE8, H L . CLGUQH.R U California, (Jniv of, BcrltN,
OCfl/EERC-7'9/23 V01 79/09/30 275pp Available at MTIS
Off3a.H77 24X Fiche- 90-266, 61/07/17,0107870136
-31072701 2: "Snaking Table Study of Single-Story Masonry House*, Vol f -
Test Structures 3 t< 4 "
OULKAN.P , MAYES.H L . CLOUQH, R H California, Univ of. BrllN|
UCB/EERC-79/24 V02 79/09/30 300pp 09153 104 24X
Fiche SO-S66,al/07/17,ai07270156
-ai07270te& "Shading Tattle Study of Single-Story Masonry lli>usil,Vol J-
Summaryi Conelui ons t> Recommendations "
CLOUCH, R,W , MAYES.R L , DULKAN, P California, Univ of, Berttln
UCD/EERC-7?/2S VO3 79/09/3O IlOpp Available at HTI8
09154 078 24X Fiche 90-266,81/07/17/0107270196
-Bt0727Oiaa "Cyclic Shear Tests of Masonry Piers,Vol I - Tut Ptlvlii '
MAYESR,L . OMATE. Y i CLOUOH. R H California, Univ of, HirkUti
EERC 7(b-B 76/05/31 lOSpp 09194 192 24X
Fiche.SO-264, 91/07/17, 8 107270 1 S6
-3iO7Z7O191 "Cyclic Shear Tests of Maionry PiersiVol 2 ~ Arnlijdi
Ttst Resiflts "
HAYESrR L . QMATE, Y , CLOUOH. fl W California, Univ of, Birkl
EERC 76-16 7&/06/30. 7Bpp 091S4 2B9 B4X
Fiehe; 50 -246,81/07/17.8107270156
-9107270194 "Strength of Timber Roof Connactions Subjected to Cftllt
Laadi "
OULKAN.P , WAYEB.R L , CLOUOH. R W California, Univ af, D.rt*Ii|
UCB/EERC-7B/17. 7B/09/30 17Ipp 0915S 005 24X
Flehe'50-26A, 81/07/17,8107870156
DOCKETED ITEMS
65
-BIQ7270196 'Literature Survey Transverse Strength of Masonry Wall;
nr-tATE. V , HA^ES.H L . CHEN. S J California. Univ of, Berkeley
L/CB/EEHC-77/O7 77/O3/31 l49pp O9155 140 21X
Fiche 50-366, 01 /O7/17. B10727O1 56
8107270193 'Literature Survey
. Tensile, Dond b Shear Strength
HAVES R L , CLOUGH:H H California. Univ of, Berkeley EERC
75-85 75/06/30 312pp O9155 3B6 34X Fiche 50-266,81/07/17.
8206210571 "Point Beach Nuclear Plant Units 1 b 2 Inmrvico 1 nap
Program Technical Evaluation Rapt "
Science Applications, Inc NHC-03-B2-094 SAI-13.6-02H-33
82/06/15 NHC - No Detailed Affiliation Qivon 20pp
19597 199 34X Fich 50-266,82/08/31,6210040414
0510040427 Notice of issuance < availability of rtmonds A3 & i.0 it
Licenses DPR-24 & DPR-37. i espec tive ly
CLARK, R A Operating Reactors Branch 3 B2/OB/31 3pp
19597 179 34X Fichs 50-266,83/08/31.8310040414
-S1O727O197 "State-of-<-hc-Art in Seismic Shear Strength of Masonry
evaluation I Revieu :
MAVEB.fi L . CLOUOH.fi W La 1 1 forma , (Jniv nf, Burialey ECHC
75-51 75/10/31 I47pp Q9I56 135 34X Ficoe 50-366, BI/O7/17,
(it 0727015ft
83100S0186 Forwards IE Insp Ropts 90-266/82-12 6 50-3O1 /B2-12 on
820303-04 t< 0619 (. notice of violation
KEPPLER.J Region 3, Office of Director 82/0?/15 BURSTEIH,
Wisconsin Electric Pouer Co 3pp 1S611 113 24X
Fiche 90-266, 03/09/13,8310050104,
21OG7QOO7 Responds to FOIA request for eight categories nf records re
strain generators & steam turbines App A documents provided
in a Udell FOIA Request Bl-313 Forwards documents listed in
App, D
r EL TOW. J M Division of Rules anil Records B2/OB/10 LONQ, D J
Mitithr-op. <3tiinson. Putnam S. Roberts 9pp 15645 063 24X
Fiche 5O-CQO. 53/03/10.8310070007
7812200205 Surmarues steam generator tube leak on 78092O t< i nsp
Lvat ^a^e reached 560 gpd at 5 00 AM. caused by two
tuies u/cracks located ui/in thickness of tube sheet tt one
(rube bi/lcaky P' U 9 General cause plant conversion to AVT
MIOfWJ. V S Engineering Branch IPre 791Q30) 78/12/13
GKEHES. D K Assistant Director for Engineers & Projects (Pre
79D625) 2pp 15645 34-1 24* Fiche 30-000, S3/OB/10, B210070007
-T9O92BO1O5 Discusses steam generator lube leak (. inservice insp Steam
generator caused by deep crevice cracking of thi ce tubes
uMthin tube sheet Hot leg tube tests indicated 52 tubes u/
deep crevice cracking in eicess of SOX plugging limit
fvDOMAN.V S Engineering Branch (Pro 791030) 79/OS/17
fclEENHUT, [1 Division of Operating Reac tors 3pp 15645 254
24X Fiche 50-000. S2/OB/ 10,021 0070007
-B2 J CO7QI3 1 ? Forwards tabulated data on s toam generator insp !( maint at
facilities. Data should be provided to licensees
IPPOLITDi T Opera'-ing Reactors Assessment Branch B2/O4/01
VARUfl. S Operating Reactors Branch 1 5pp 15645 131 24X
Fiche SO-000, 82/08/10, B3I0070007
-G21QO7QI72 Foruiards info re steam generator integrity t> insps at all
Operating PURs. per 7503501, 31 requests Details of Inspai
including defect ind icati nns, tube plugging criteria & tubes
plugged ui 1 I nol be provided cicept far Point Beach 1
GOLLER K R Division of Reactor Licensing (MRR-1975 only)
79/O3/24 MflCCARY.R R Division of Technical Hevieu [NHR-I975
Q nlHj> Spfi (5i15 196 21X Ficho 50-000, 82/08/10, 8210070007
B21005OW4 Notice of violation from Insp on 820503-04 i OAI5
KEPPLER. J Region 3, Office of Director B2/09/19 3p p
15611 MB 34X Fiche 30-266, B2/Q9/ 15, B2100S0186
B210050205 IE Insp Repts 50-266/83-12 !. 50-301-82-12 on B30S03-04 !<
0615 Nnncompl iance noted failure to control access to high
radiation areas t failure to follow approved procedures
LOVENDALE.P C . HAGUE, R L , OREGER, L R Region 3. Office o*
Director 82/07/13 Qpp 15611 121 34X Fiche 50-266. (?2/'9/15,
32 10050 186
S210D70Q33 Notifies that foes for B20B20 application requesting, relief
from certain inservice insp requirements not remitted
w/application Class lit fee category appropriate
DIOQS.R H License Fee Management Branch B2/09/23 FAY. C W
Wisconsin Electric Power Co lp 15649 346 84X
Ficha 90-266,83/07/23,8310070033
B2100S0256 Requests relief from ASME Sac tion XI , (naervico insji
requiremiinta re> frequency of reactor vessel interior exam
FAY.C W Wisconsin Electric Powor Co B3/O9/39 DENIuN, H B
Office of Nuclear Reactor Regulation, Director CLARK. R A
Operating Raactori Branch 3 4pp 15610 306 34X
Fiche 90-266, B2/O9/2 1 ?. 83100SOH9i
8210190669 Forwards IE Insp Repts 90-266/03-30 t, 50-301/B2-20 an
030914-16 No noncompl iance noted
LITTLE, H 8 Division of Engineering fc Technical Programs aa/10/04
DUMTEIN'S Wisconsin Electric Pouer Co 2pp 1573Q'1S3 24X
FichB 30-266, 82/10/04,3210190669
--88 10 WOWS IE In*p Repts 30-266/B2-20 b SO-301/B2-20 on 82071 4-16
No noncompl i*nce noteil Major areas inspected surveillance
d callbr procdora t performance history
HAS3E.R A , PEaCHEUJ M i HAWKINS, F C Division of Eng ineor i np &
Technical Programs 82/07/29 4pp 1373Q 131 24K
Fiche SO-S66, B2/10/O4. B2101 90669
--Q210O702O5 Submits summary of findings & comments le facility atenm
generator tube leak incident & Insp results contained In
Annual Operating Rapt 197& Recommends that licensed be
req.uastod to submit insp program for next scheduled insp
CHAD, L C Engineering Branch (Pra 791030) 77/07/S3
EISEIJHUr.B G Divslon of Operating Reactors 2pp 13649 335
24K Ftclie 90-000,83/08/10.8310070007
B2IOO7022B Forwards evaluation of B00236 proposed steam generator inap
It tube pulling program Recommends that program he revised
to reflect listed comments
fjOONAM-V 5 Engineering Branch 82/08/10 6CHWENCEH, A
Operating Reactors Branch 1 IPre B004E9) 2pp 15645 268 34X
Fichu 50-000, B2/OB/10, 8210070007
ti2LOQ40411 Forwards Amends 63 fc fifl lo Licenses DPR-24 U DPR-27.
respect tlvelyp safety evaluation fc notice of issuanco !<
dvallablllty Amancfg revise inservice Imp Tech Specs
CLAFIK.R A Operating Reactors Hrflnch 3 B2/OB/31 FAY, C W
IJisconsin Electric Pouer Co 5PP 13597 134 24X
Fichu 50-246. 62/08/31, 821004O414
B2IOQ4O420 Amends 63 b 68 to Licenses OPR-24 t. DPR-27, respnct ively,
ravliing language of Tech Spall re inservlce insp
requirements of safety class components to conform
U/10CFF15O 55
CLARK. R A Operating Reactors Branch 3 B2/OB/31
15597 139 24X Fiche 50-266, B3/08/31 . SSI 0040414
16pp
Q2IOD4O435 Safety evaluation supporting Amends 63 & 68 to Licenses
BPR-21 b DPR-27, respectively
* Office of Nuclear Reactor Regulation. Director 82/08/31
15597,155 24X Fiche 50-364- B3/OB/31, B31004041 4
4pp
8208190233 IE Info Notite BO-33. Buppl 1, "Leaking t Dislodgiad 1-133
tmpUnt 6edi " Svc Hit and
CODDrL I Division of Fuel Facilities, Materials (. Safeguards
82/10/06 Consolidated Edison Co of Nsui Voik 66pp 13761 230
24X FichB SO-000. 92/10/06, B30B190233
8210180067 Forwards Cla III foe rt B20B20 request for eiemptians
from certain inservice insp requirements (Jt 1 1 considers
imposition of 10CFRI70 22 fees Inappropriate an request does
not involve license amend
FAV.C U Wisconsin Elnctric Power Co 83/10/11. DENTON. H R
Office of Nuclear Reactor Regulation, Director CLARK, R A
Bperating Reactors Branch 3 lp 13730>003 34X
Fiche BO-266, S2/10/1 1 - B3101BOO67
B30B19033B IE Bulletin 8B-03. "Stress Corrosion Cracking in Thick-
Mll.Large-Dlaintt>r.8talnl*is StesI.Becircu latian Sus
Piping 't BWR Plnt. " Bvc lit encl
DEYOUNO.fi C Director's Officer Office of Inspection and
Enforcement 82/10/14 Consolidated Edison Co of NBU Yorl
119pp 13810 1SB. H4K Fich* 30-000,82/10/14,8300190238
R Periodic oparattng reports d related correspondence
8210150190 Foruiards monthly operating r*pt for Sept 1982
FAY, C W Miiconfln Electric Pouer Co B2/10/H Office of
Nuclear Raactor Renulation, Director lp 19697 074 34X
Ficht,SO-2i6, aS/IO/1 1,82101901 30
-8210150158 Monthly operating repts for Sept 19B2,
FAVtC W HUconsin Electric Power Co BH/10/04
24X Fiche go-S66.e2/10/ll>8210130150,
Qpp
1S&97.075
DOCKETED ITEMS
S Importable o ccurrence'tj LERi related correspondence
6310390259 Forward* LEfl 9S-015/03L-Q
FAY, C, W Wisconsin Electric Pouer Co 02/10/13 HEPPLER. J
Rejlon 3, Office of Director Ip 1 5791 1 4B 34X
Fiche 50-366. 82/10/13,3310350253
21025-0262 LER 82-015/03L-0 on 930914. fluid level in gat stripper noted
decreasing abnormally after stripper returned to svc
Following main* Gained by high itreiis IDU cycle failure of
lap joint flans* tub P i Lap Jpint Planoe reflated
FAY.C U Hi!COTHin Electric Pouer Co 02/10/13 RecioTi 3,
Office of Director 3pp IS771 147 S4X Fiche 50-266,02/10/13.
8210250253
8210220404 Ack receipt of B209I9 response to App A it urns of |
Emergency Preparedness Appraiial Reft 50-267/03-01 Add I Info
needed to complete avaluation of rosponso
MAD9EN.G - - - - -
Programs
15779 160 24X Fichu 30-367,02/10/19,0310220404
d to complete avaluation of retponso
N.G L Diviiton of Resident, Reactor Project S En-j insir Imj
ami B2/1O/19 LEE, ft Public Service Co of Colorado ?|i
9 160 24X Fiche SO-367,02/10/19, 0310220404
p Operating licenit stage documents 4 correspondence
9210040114 Foruardi info documentlns satisfaction of each trlttrion
of NUREO'0737i I tra fl B 3 ro post-accident sampling sys
ORML inVf itigatior of source term* remainv onlij open item
WAREMBOUJJO Pub-lie 3arvice CD of Colorado B2/09/37 CiMK.K A
Operating RBactart Branch 3 40pp 15591 lli SAX
F*che SO-2t7,e2/0 1 ?/27,8210D40H4
9210250344 Forward* LEfl 92-Q16/01T-0
FAY,C H Hueonain Electric Power Co 83/10/15 KEPPLER.J
Region 3. Office of Director Ip 15790332 24X
Fiche SO-B6&. 32/10/13,3210330344
6210350353 LER 92-016/011-0 on 821003. containment Isolation Valve
ICV-aaOOC In suction line of radioactive gas A particulatt
monitoring su.! failed to close Caused by failure of 3-uay
solenoid valve to cycle Valve closed & repaired
FAY.C U Ulieoniln Electric Power Co 02/10/15 Region 3.
Office of Director 4pp 15790 333 24X Fitht 50-266, 93/ 10/1S.
S3102S0344
9210000256 ForuJirdt "Radiochemica 1 Analysis of First Plateoul I'rntr
from Fort at Vrain High-Temp Oas-Caoled Roactor "
WAREMBDUR&,D M Public Service Co of Colorado B2/09/a/
KUZrtVC/.O HRC - No Detailed Affiliation Olven [p tihW -"J!0
Sty Flch* 50-26:7, as/09/27. 6210060256
--B2100B025B "Rat 1 ochemical Analysis of First Platoout Probg (row ft.il
St Vrain High-Temp Q4-Cooled Reactor "
BURNETTE.R D Oft Technolog iei, Inc /General Atomic Co
B2/04/30 I28jp 15649291 24X Fiche 50-367,
210080256
T Haring transcript* on non-ant i trosit matter*
3210-090052 Transcript of 921006 telephone conference to discus*
rescheduling of hnarjng In Uaih ing tt>n. DC Pp 1.342-1.352
* Atomic Safety and Licensing Board Panel 02/10/06 13pp
15643 294 24X Fiche SO-S66, 92/10/06, 0210090052
B31Q04O273 Forwards suppl to EE-1 1-0002, Revia inn 3, "Addl GurvillUnci
Fteo.ulrtmenti For PCRV Penetrations t Clocuret," tt suppl to
EE-22'-O002, Hevision I. "InservicB tnsp & Testing Program
Addl Survei 1 1-anc B RequiremBnti for Steam Oeneratnr "
BREYi H L Public Service Co of Colorado B2/09/3O CLAW. II A
Operating fleactor* Branch 3 2pp 15621 leo 24X
rtcha 30-367,02/09/30,9210060273
DOCKET 50-S67 FORT BT VRAIN MUCLEAR ftENERATIWO STrtTlDM
F Security medlcali emergencv & fire proiectlon plan*
0210060292 Sup pi to EE-1 1-0002, Revis i on S. "Fort Bt Vraln A4dl
Surveillance Requirement* for PCRV Penetrations ti Clomurn
* Public Service Co of Colorailo 32/09 /aa 12pp 1BAHI 1EIJ
24X Fiche 30-267, B2/09/30, 9210060273
9209150434 RD-leai*! public vert-ion of updated radiological em?rgvncy
response; plan.
FELTt!N.J,M Dlviiion of Ruin and Records 92/00/ES Document
Manftgament Branch Ip 14B90 193 29X Fiche 50-267, 82/0"B/33,
9207130434
~9ai00602BA Suppl to EE-22-0002. Revision 1. "Fort St Vrain Int
Imp & Titlng Program Addl Surveillance Requirement! ti'
Steam Oenerato-r "
Public Service Co of Colorado B2/09/2B 7pp ISA^I
24X Ftche 50-267, B3/09/30, S210060273
G2091Q0440 Forward! public veriion of updated radiological emergency
Tes-ponie plan, per B20315 reitueit Enct reviiinn it almoit
complete raurlte exclpt for visit on ctr !e HEfiP-FIELD
procBifiir>i W/o encl
HAREMBOimO, D Public Service Co of Colorado:, 62/09/10
ROHRER, & Director'* Otfi-ct, Office of Inspection and Enforcement
Ip 14370 174 24X Flche 30-267, 32/03/33, 9209150434
S3 1 01 90701 Forward! "Fort St Vrain Accident Reanalysn Cnde IIUH'A J
Verification Following Region Outlet Temp Redistribution,"
per B102IO meeting commitment Code accurala lij predict!
transient behavior in temp red! itribut ion configuration,
DREY. H L Publir Service Co of ColorariP 02/10/06 NOVAK, I H
Aeiistant Director for Operating Reactors Ip 1373& 355 . hJ U
Fiche SO-267, 02/10/06, 9210190701
9210250093 Commit* to reviling security plan & implementing Pro cud urn
APH Q-4 to provide fur background invt-ttlgat ion of outside
contractor personnel at Facility Screening program will be
Implemented within 60 daye
LEE,O R Public Service Co. of Coloi-jifD 62/00/25 COLL[NB,J T
Region 4i Office of Director. 3pp 15797 0&3 24X
Ficht 50-S67, B2/OB/3Bi B2102B0083
9210210073 Releases public virtlon of radiological emergency rafiponaB
plan implementing' procedures.
FELTOM, J.M Dlvleion of Rules and flu cords 03/09/27 Dncument
Management Branch Ip 19774 126 24X Ficht SO-SA7t 92/09/29,
6210310073
B21-0-2lOOai Foruerdi public veriion of radiological emergencu reaponae
plan implementing procedureii including Inp lint/oni i tt
"" " " 'ure & field monitoring
0210170706 "Fort St Vrain Accident ReanalijsJa Code (RECA Ul
Verification Following Region Outlet Temp Redistribution "
Public Service Co of Colorado B3/10/06 42pp 13/.Jh lift
34X Fiche 30-267. Ba/10/06, 8910190701
G21O270104 Forward a 931012 application to amend License DPfl-iH. T*Y HI
iurve i 1 lance rn.uir ements
L.EE, D R Put lie Service Co of Colorado Q2/10/1Q CL*HH.R
Aniitant Director for Operating Reactor* 2pp 15027 090 '4J
Fiche 90-567,02/10/15,8210270104
9210270113 Application to amend License PPR-34, changing T-tth typeci
iniervlce inip S< testing program surveillance requlrenenli
LEE, R Public Service Co of Colorado 82/10/12 9fp
ISBS7 OSS 24X Fiche 50-267, S2/IO/ IS, 021 0270104
B210270118 PropoiBd Tech Specs changes involving reierve ihulJi,ti>
lurvelllancej prlmarif coolant sys surveillance requirement),
tendon corrciion k anchor assemblies Iinpl ementatinn schiduli
& BAR encl
* Public Sirvico Co of Colorado, 02/10/15 54pp 1302' Oil
S4X Fiche 50-267. 92/10/19,8210370104
0. Inspection niporta, IE Bulletins l> correipondence
9210O50326 Forwardi IE Insp Rept 50-267/98-20 on 820901-31 lid
nancompliance no tad
MADBEN, L ClvUion of Resident, Reactor Project tt Englniirii
program 93/O9/14 LEE.O R Public Service Co of ColoriJ*
lStOB-301. 24* Fiche 50-267,32/09/16,9210050226
!tt
DOCKETED ITEMS
67
-B21003O239 IE Insp Ropt 50-267/02-20 on 820801-31 No noncomp 1 lance
noted Major areas inspected surve 1 1 lance, maint, operat I anal
safety ver i f icat i an, previous insp f inding s. p lant operations
DICKERSQN M W . PLUMLEE. G L . UE5TEHMAN. T F Division of Resident,
Reactor Project t, Engineering Programs Q2/09/10 13pp
I56OB 311 24X Fiche 50-267,33/09/16,0210050226
8310060273 Foruards suppl to EE-l 1-0003, flevi s ion 2. "Addl Surveillance
Weq.uiremt.nts for PCBV Penetrations & Closures." d suppl to
EE -22 - 00112, Flevision 1, "Inservice Insp ^ Testing Program
Addl Surveillance Requirements for Steam Generator "
SREV.H (. Public Service CD of Colorado B2/09/3O CLARK, H A
Operating Reactors Branch 3 2pp 15621 ISO 24X
FicfiB 50-267,02/09/30,8210060273
B21013Q349 Monthly opsrating TBpt for Sept 19B3
KCBRIDE.L M Public Service Co of Colorado 6B/10/06
15692 031 24X Fiche 50-267,02/10/06,6210130344
Spp
8210190653 Forwards monthly operating rept for Sept 1982
WAREMBDURO, D Public Service Co of Colorado 02/10/12
GAMMILL-W P Assistant Director for Operating Reactors 2pp
15739, OBI 24X Ficho 50-267.02/10/12,8210190653
8210190667 Monthly operating rept for Bapt 1982 Narrative summary encl
MCBRIDE.L M Pub He Service Co of Colorado G2/10/06 9pp
15739 083 24X Fiche 30-267. 82/tO/ 12, 0310190655
S RBportabla occurrences, LER* Si related correspondence
aai00602&2 Suppl to EE-ll-0002. Revision 2. "Fort Bt Vrain Addl
Surveillance Requirements For PCRV Penetrations & Closures "
Public Servile Co of Colorado B2/09/2B l2pp 15621 102
24X Fiche 50-267.92/09/30,0210060273
8210050331 Foruard* LER B2-035/03L-0 Detailed event analysis end
WAREMBOURQ'D Public Service Co of Colorado 82/09/23
COLLINS, J T Region 4. Office of Director 4pp 15602 394 24X
Fiche 50-267, B2/09/23iB2IOOS033i
--83SO06O2&6 5upp| to EE-22-0002, Revi sion 1, "Fort St Vrain Inservice
Insp A Testing Program Add] surveillance Requirement* for
Steam Generator "
< Public Service Co of Colorado 82/09/23 7pp 15621 194
34K Fiche 50-267, 82/09/30. 021 OO60273
0208190233 IE Info Notice BQ-3S, Suppl I, "Leaking I. Dislodged 1-125
Inptant Seeds " Svc list encl
COBH.L [ Division of Fuel Facilities, Material
8?/IO/06 Consolidated Edison Co of Neu York
24^ Feche 5O-000. 02/10/06, B20BI 90233
ft Safeguards
66np 19761 350
9210380142 Forwards IE Insp Rept 50-267/82-19 on 820809-13 & 0830-0903
>j notice of violation
MADS EM, C L Division of Resident, Reactor Project & Engineering
.Programs 02/10/06 LEE, R Public Service Co of Colorado 2pp
15837 227 24X Fithe 50-967.82/10/06.8210200142
--S210380H5 Wotue of violation fvom map an B20B09-13 fc 0030-0903
* Division of Resident. Reactor Project & Engineering Programs
Ip S5B37 229 24X Fiche 50-267, 03/ 10/06, 0210200142
--O2102SO149 IE Insn Rent 50-267/82-19 on 820809-13 t- 0830-0903
Noncamp I i anc e noted failure to maintain test records of
sa t oty-re ia ted design changes
REDANDj R t , WESTERMArJ, T F Division of Resident. Reactor Project
t Engineering Programs 82/09/29 9pp 15837 230 24X
Fiche 50-267,82/10/06,8210250142
0208190238 IE Bulletin B2-03. "Stress Corrosion Crackino in ThicS:-
Ual 1, Large-Diameter. Stainless Steel , Rec ircu lation Sys
Plpina at BUB Plants " Svc list encl
DEVDUNC. R C Director's Office, Office of Inspection and
En r- or cement 82/10/14 Consolidated Edison Co of Neu Yarfc
H5pp 15310 125 24X Fiche 50-000,82/10/14,8208190238
821O27Q104 Foruards 831012 application to amend License DPfi-34, revi sing
survi 1 1 Idnc e requirement)
LEE.O R Public Service Co of Colorado 82/10/15 CLARK. R
Assistant Director for Operating Reactors 2pp 15827 050 24X
Fithe 50-267.82/10/15,0210270104
B2I0270M3 Application to amend License DPR-34, chang ing Tech SpacB i-e
interview insp & testing program surveillance requirement!
LEE,0 R Public Service Co of Colorado 82/10/12 9pp
13927 052 24X FlchE 50-267.82/10/15,8210270104,
B2I0270I1B Proposed Tech Specs changes involving reserve shutdown iga
surve i 1 lone e, primary coolant sus surveillance requirements,
tendon corrosion h anchor assemblies Implementation schedule
f, SAR enc 1
* Public Service Co of Colorado 82/10/19 54pp 15B27 061
S4>: Ficoe 50-267. B2/10/15.8210270104
a31022C"404 Ack receipt of 820819 response to Apa A item of IE
Em-ergencij Preparedness Appraisal Rept 50-267/82-01 , Addl info
needed" to complete evaluation of response
MADBEM, L Division of Resident. Reactor Project t Engineering
Programs 82/10/19 LEE, R Public Service Co of Colorado 2pp
63779 ]fiO 24X Fiche 50-267,82/10/19,8210220404
R Periodic operating reports h related correspondence
B31013O344 Foruardi monthlu operating rept for Sept 1982
WrtREMBOUHC. Public Service Co of Colorado 82/10/06
Director's Officer Office of Inspection *nd Enforcement, Ip
19682 030 24X Fichu 30-267.02/10/06.8210130344
0210050337 LER 82-035/03L-0 on 020B27, eng Ins IB of itandbg generator
get 1A rendered inoperable Caused by indicator lamp i/or
lamp locket short c ircu iting, causing 15 amp fuse to blow
in engine IB, 125- volt rfc c ran lino circuit
FULLER, C Public Sarvice Co of Colorado 03/Q9/S3 Region 4.
Office of Director Ip 15602 358 24X Fiche 50-267,02/09/23,
8210090331
82101V0537 Forwards LER B2-036/03L-0 Detailed event analysis encl
(JAREMBQURO, D Public Servic* Co of Colorado B2/10/OB
COLLINS. J T Region 4, Office of Director 3pp 15751 323 24X
Fiche 50-267,02/10/08,6210190537
B210I90S43 LER B2-036/03L-0 on 820908, o no of tiao bearing uiater makeup
pumps removed from svc Caused by need to rebuild mechanical
leal due to normal uear Seal rebuilt
FULLER, C Public Service Co of Colorado 02/10/08 Region 4-
Office of Director Ip I57S1 326 24X Fiche 50-2A7, B2/10/08,
82 101 90537
B210I90547 PND- IV-B2-037 on 821013. Intfi cation of increasing reactor
faldg activity & decreasing regeneration train pressure
occurred Caused by gaseous radioactivity leaking from
flanaed line in A purification train
WESTEHMrtN.T F . MADSCN. L Region 4, Office of Director 83/10/13
Ip 15731 360 24X Fiche 50-267,82/10/13,0210190547
DOCKET 50-269 OCONEE NUCLEAR STATION, UNIT 1
F Sicuritij, medical, emergency !t fir-e protection plant
8210010352 Forward revision to tafeguardt contingency plan Revision
withheld <raf 10CFR73 21)
TUCKER, H Q Dufce Pouer Co 82/09/17 DENTON, R Office of
Nuclear Reactor Regulation, Director Ip JB574 139 34 X
Fiche 50-267,32/07/17,8210010352
0210960529 Agrees u/determination to locate fire hose itationf outside
affected fire aren Change from earlier commitment
acceptab 1>
STQLZiJ F Operating Reactors Dranch 4 82/09/33 TUCKER* H B
Duke Power Co 2pp 15B30 IS? 34X Fiche 30-269,82/09/23,
B2LOZ&OS2?
B210040S3H Application to amend Licenses DPR-3B, DPR-47 b DPR-53 Amnd
rei{ue*ti deletion of Tech Spec 6 4 2 re site emergency drill
& definition of time uithin iiihlch redundant component test
mutt be performed prior to performing malnt per Tech Spec
TUCKER, H,B Duke Pouer Co 02/09/27 DENTON,HR Office of
Nuclear Ftiactor Regulation, Director 3pp 15386 104 24 X
Fiche 30-269.82/07/27,8210040832
8210040349 Proposed revision to Tech Spec Pagei 3 3-6 & 6,4-1 r> sitt
mergincv drill t timt period within uhlch redundant
componenfc tut must be performed prior to perPorminfi maint
t Duke Power Co. 02/09/27 4pp, 159B6 107 24X
Fiche 50-269,82/09/27,8210040232
P Operating license itige documents !< correspondance
6203130356 Forward i task force on pressuHied thermal shock audit of
Rub In ton plant re adequacy of in-plant training programs
& operating procedures NRC uill conduct timilar audit at
Bruniiuick plant.
NOVAK. T K Aislitant Director for Operating Reacton. 83/04/23,
PARKER, WO Duke Pouer Co, 2pp 13089038 34X
Fie he. 50-269, 83/04/23,8303130336
68
DOCKETED ITEMS
B21G08QQ36 Rp ondl to FOIA rtnurst for document* re pin* designed to
hold neutron iMelding pads In place under Accident
c ondt tiont- Forwards documenti lilted on App A
FELTON.J M Division of Rule* and Recordi B3/OB/13 EDDLEMAN. W
Public Interest Research Or cup in NOT in Carolina 2pp 15A69 240
24X Fiehe 50-269, 92/00/13. B2100S0036
lal respnnse to Franklin Research -Ctr draTI
apt re control of heavy loadi<ptr
82IOIB0060 Foruai-di pa
technical t valuation
HUREO-0612
TUCKER. H B Duke Power Co 82/lQ/OB DENTQN, H R Off let at
Nucliar Reactor Regulation, Director 9TQLZ. J F Operating
Reactor* Branch 4 5pp 15730011 34X Flche 50-269, E2/JQ'C3
B2101800S5
S2IOOB0044 Notification of B11Q09 meeting w/util in GethesdJ.MD to
dlicun broken therm*! ihltld bolt* in Unit 1
UAQNER.P C Operating; Reactors Branch 4 81/1O/O5 BTOLZ.J F
Operating Reaction Branch 4 2pp 15669 263 24X
Flche 50-000, B2/QB/13, 82100BOQ36
8209250417 Discusses broken core barrel assembig thermal th U 1 d bolts
at Occur* 1 J. appl itab lit tu to other BW pUnti Imp of
OconeB 3 & other B6W plants iif/thermal shield bolts made o-f
nme mails r*c ommended
CLSHINSK.!, J A Division of Engineering 6 Technical Programs
B2/03/29- EIBENHUT.fl O Division of Licensing 4pp 13669 285
24X Fiehe 50-000,82/0-9/10.8210080036
8210Q101O7 Atfvfsei that util response to MIC B2O21B Itr ul 1 1 be
provided by BZ10QB Receipt of Info from crane vendor (t
ei traord 1 nari| analgtfca) work have delated response
TUCKER. H B Duke Power Co 82/09/24 DEN TOM, H R Office of
Nut liar Reactor HaguJatl on* Director STQLZj-JF Operating Reactors
Branch t Ip I 35BI 034 24X Ficfi* 30-269, 82/09/24, 8210040 107
B21QaiQ13l Responds to NRC 820908 Itr transmitting technical evaU*1
rept on emergeniu feaifuiater ius Siji may nut meet all current
criteria for seiimic nual ificat ion. bu t will remain
funct i anal lij operabia during ODE
TUCKER, H B Duk Pouar Co B2/10/13 DEN TDM, H R Dffitt of
Muclear Reactor flegulation. Director STdLZ. J F OnBralma Raiit
Branch 4 4p p 15766356 2flX Fiche 50-2i9, B2/ 10/13, 0310210131
aai021040>7 Application to amend OLnrevlsina Tech Spec 3 1 allculri
Full ;ouer operation of Unit 1 for interim period until
appropriate tafctv valve ring settings can be implemented
TUCKER- H Q Duke Pouar Co 93/10/14 DENTON, H R (IfHct 0'
Nuclear Reactor Regulation, Director STOLZ,JF Operatlnij Ruti
Branch * Bj>p 15764 030 24X Fiche 50-269, 02/10/14,
B2IQ2JO4I1 Propoied revision to Tech Spec 3 1 allaiuing full pa
operation of Unit 1 for interim period until approprut*
safety vajve ring setting can bo implemented
* Duke Pouar Ci> B2/1O/I4 Ip 13764 043 24X
Fich* 30-2A9. 02/10/14,0210210407
8210040232 Application to amend Licenses DPR-3B, DPR-47 & DPR-55 Amend
requests deletion of T*cti Spec 6 4 2 TI lit* emergency drill
I, definition of time mi thin which redundant component tv*t
must tta perfnrnifif prior to performing malnt per Tech Spec
TUCKER. H D Dukt Pouar Co BSfWfS? DENTON, H H OfPlea of
Nuclear Reactor Fteoujatl o-n, Director 8TOLZ.JF Operating Reactors
Branch 4 3y p IS5B6 104 S4X Fiche 50-349,63/09/27,9210040233
9210040245 Proposed revision to Tech Epic Pages 3 3-4 t 6 4-1 re Bite
emtrgencij drill b time period within uhlch redundant
component test must be performed prior to performing malnt
* Duke Power Co B2/&9/27 4pp 15596,107 S4X
Fiche 50-269, B2/09/27, B2IOQ40232
9210190143 Foruard* Amends [13,113 & 110 to Licenses DPR-3B. DPR-47 h
DPB-55i respec tlvelu, saf ty evaluation 1 nptlce of Issuance
& availability Amend* rtviia Tech Specs to allow ful] poui*r
operation of Unit 3 during Fuel CijclB 7
WAQNERp P C Operating Reactors Branch 4 BS/01/Sf TJCKER, H
Cuke Power Co 2pp 15737 341 34X Fiche 50-269, 02/0 9 fSI.
B210l90i45
--S210I70154 Amends 113,113 t< 110 tn Licenses DPH-3B, DPR-47 b
r*spectivel y> nvi ling Tech Specs to allow full power
operation of Unit 3 during Fuel Cycle 7
STOL7.J F Operating Reactors Branch 4. 82/07/39 31pa
J5797 343 S4X Ftche 30-2i9, 02/07/29,621 0190145
-82101 90 l&l Safety evaluation supporting Amends US, 113 & 110 to
Uctnsut DPR-38, DPB-47 J: DPR-55i res pectivetij
Office of Nucltar Raactor RflguUtlon. Director B2/09/29
1S75S-012 E4X Fiche &0-Sfi9.Ba/09/a, 6310190149
Inspection report*, IE Bulletins & correspondents
62100)70007 Responds to FDIA request for Bight cabegoi-ies of rocor^
steam generators b ate*m turbines App A documents provided
in R Udell FOIA Request 01-313 Forwards documents listed in
App Q
FELTDN.J M Division of Rules and Records B2/08/10 I 01 JO. -f
Ulnthrop, StimsoTi, Putnam & Roberts ?pp 15645 Qb3 J4*
Fiche 5O--000, Sa/08/10, B210070007
9210070172 Forwards info re iteam generator integrity t tnip*
operating P(VRi,per 750320 4 21 requests Details of Lnipt.
including defect indica tions. tube plugging criteria & tubei
plugged will not be provided except for Paint Dcctch I
COLLER,K R Division of Reactor Licensing (NRR-1775 niilu.1
7S/03/S4 MACCrtHV.R R Division of Technical fleviau tNFW-
onluj 5pp 1S&4S 196 34X Fiche 30-000, S2/OB/IO, (
ipp
B210150369 Foruard* results of investigation of Item 7s of ]C l
R.pti 50-269/32-21,50-270/02-21 t, 5O-2B7/S2-21 Defldtime
values for gamma ipactroscopij analuses of waste gas silver
leollte crtridg>* ui 1 1 cause onlij insignificant errors
TUCKER. H Duke Power Co 82/QB/17 O'REILLY.J p Haolan
Office of Director 2pp 15704 369 24X Fichu 50-a&9,
B2 1015030?,
0210-0-1OI17 Foriuardi IE Insp Repts 50-269/02-33, B0-a70/03-3a t.
50-397/82-33 on B2O817-20 No noncomp 1 lance noted
DArfC-E.H C Diviiion of Project fa Resident Prooraml 03/01/02
TWCKERjH D Duke Power Co 2pp 19366 019 24X
Fiche 30-269. 82/O9/Q2, B2100101 1 7
--82IO170169 Notice df issuance b availability ofAminds 113. 113 fc 110 to
Licenses DPR-3B, DPH-47 h BPR-55,, Tltpectivelu
BTOLZ.J F Operattnfl Reectors Branch 4 B2/0?/H9 Spt
1B7&B O1S 24X Ficne BO-24.9, B2/07/29, B21 0190145
32101B0323 Responds to B209I3 Itr re reactor bldg purge lui Position
given in BJ0707 fc 17 6trs remains unchanged Schedule for
submitting info Indicating purge sijs miets op-erabil 1 tij
reqiilTeiriBnt* reqtieitad
LAINAS.8 C Assistant Director for Operating Reactor* B2/09/30
.. . - - Co 3pp
10130323
B21Q010124 IE Insp Repts 50-269 /B2-33, 30-27 O/S3-33 i. 30-aD?/na-3J
on B206I7-2O No noncomp 1 lance noted Major areas inspected
action on pravlous nforcmnt matters, au 1 1 iaru fadwlr
header repair & Inservice insp procedures
CRQWLEY. B R. , BLAKE. J J Division of Eng ineenng t. Tictmltdl
Proorams 82/O9/01 Bpp 15566 021 34X Fiche 30-26 1 ?. Q3fGtn.l
8210010117
&ai001019B Foriujrdi IE Insp Repti 30-269/83-30,50-270/03-30 !
30-237/82-30 on 820716-0310 No noncomp 1 ianc e noted
DANCE.H C Division nf Project d Resident Programs 03/09/02
TUCKER, H D DukB Pouer Co 3pa 1 5367 23B 24X
Fichs 30-H69, ea/09/02,Q2100101BB
ongoing NRC restarcli prosram
il m Facilitg
W NBG3 plant 0cliri
Office of
Diviiion of
/07.B210130137
--B21001O!6i IE Insp ftepts 50-269/82-30,50-270/82-30 b SO-HOJ/BS-K f
G2O71&-OB1O No noncompHance noted Major areas inspected
operations* surveillance testing, maint.NUHEG-0737 moid t
refueling activities
ORDERSjW , FALCONER, D , BRYANT, J C Division of Project b Ruifr
Fro-grami G3/O9/02 t3pp 15567 HiO 24X Fiche 3Q~St-1.aSf01.-S
BS10U1013B
re adequacy of
Info
Jffice of
rating Raactors
B210I80055
eaiOOiO45B Aek rceipt of 82080S Itr informing NRC of stepi t*li
correct violations noted in IE Insp Rapti 5~0-2&9/B2-!!3,
30-270/82-23 t, 90-2B7/S2-23
LEWI8.R C DivHio-n of Project (. Resident Programs 82/09/1?
TUCKRrH. B Duke J>our CD Ip, 1557O 182 24 X
Flche, S0-2i9r 82/09/17. 821 001045B
DOCKETED ITEMS
69
--B2IQ010463 Responds to NUC 020712 1 tr re violations noted In IE Inep
Beptt 50-269/82-23. 50-370/63-33 !. 50-2B7/82-23 Corrective
actions personnel counseled ! valve 2HP-1 4 cut out d
properly reinstalled
TUCKER. H JJ DU*B Power Co 82/00/05 D 'HEILLY, J P Region 2,
Office of Director Ipp 15570 1B3 24X Fiche 50-269, 82/O9/17,
rwards IE Imp Repts 50-269/82-23. 50-270/82-33 t-
50-237/82-23 on 830510-0610 ', notice of violation
LEWIS, R C Division of Project I. Resident Programs 0S/07/12
PAHllEFf, W Q Duke Pouer Co 2pp 1 557O 187 21X
Ficlie 5Q-3A?. 82/09/17, 8210010458
B210O10471 Notice oF violation from insp on B20510-0610
DivisiOTi of Project & Resident Programs 82/O7/12 3pp
15570 189 24X Fiche 50-269,92/07/17,8210010458
SaiOOl047fl IE Inap Repts 50-267/B2-23, 50-270/B2-23 t, 50-307/02-23 on
320510-0610 Moncomp! lante noted Failure to f o 1 1 ou procedures
resulting in plant trip fc Inadequate procedure resulting in
Improper reassembly of safety-related valve
QFfDEfiS.W , FALCONER, D . BBVAHT, J C Division of Project b fiosidunt
Programs 92/07/09 ISop 15570 191 24X Fiche 50-269, 82/09/17,
S21001045B
8210190552 Monthly operating fepti for Sept 19B2
REAV1S.J A Duke Power Co 82/10/13 16pp 157S1 344 24X
Fiche 50-269, 92/10/15,9210170544
S Reportable occurrences. LERs !< related correspondence
B21015Q07 1 ? Forwards LER 81-001/O3L-0 Detailed event analysis ancl
PARKER, W Dufce Power Co ai/02/04 O'REILLV.J P Region 2,
Atlanta. Office of the Director (Bl/03/01) 3pp 13697 Oi3 24X
Fiche 50-26?, 81/02/01,8210150079
B3101500B4 LER B1-001/03L-0 an 810105, turb i ne trip from 90X full poujor
occurred Cauaed bij loss of excitation on generator Field
resulting from mismatch during personnel attempt to rail?
volt amperes reactive on Units 1 ti 3
JONES, J L Duke Pouer Co Bl /OS/04 Region S, Atlanta, Office
of the Director (Bl/03/01) lp 15677 066 34X
Fiche 50-269,81/03/04,821015007?
8210010009 Responds to FOJA request for 19 categories of document* re
nuclear reactor events & safety problems Forwards documents
listed in App A
FELTDN, J H Division of Rules and Records 83/06/28 UDELL, H A
Critical Mass Enemy Project 15pp 15727 005 24X
Fiche 50-000, 82/06/2B, B2100100QB
5^10150253 Forwards IE Insp Repts 50-269/82-32,50-270/82-32 t>
50-237/62-32 on 830817-18 No noncomp 1 lance noted
DAMCE.H C Division of Project '. Resident Programs B2/09/17
TUCKER. If B [Juke Power Co 2pp 15703 267 21X
Fiche 50-269,83/09/17.6210150253
S2tQL5Q263 IE [nap Rapts 50-269/B2-32, 5O-270/82-32 t, 50-307/02-32 an
920Q17-1H No noncompl iance noted Major areas inapected lab
-Qr, & review of rad inchemistri) procedures & recorda
EVflNB, C D . MONTGOMERY. D M Division of Emergency Preparedness ti
Operational Support B2/09/ I S 3pp 15703 269 24X
Fichu 50-269, B2/07/I7, 8210150253
621015-0(3! Forwards IE Insp Repts 50-269/B2-35, SO-270/92-3S t"
50-SB7/D2-35 on 820900-10 No noncomp 1 iance noted
BAMCE. H C Division of Project d Resident Programs B3/09/23
TUCKER. H Q fluie Power Co 2pp 15698 313 24X
Fiche 50-2&7. S3/09/23, B2101 50131
8210040374 Forward* LER BO-20/03L t HD 2&9/BO-9 re failure to open
auilllarij feeduater valve & failure of fire detection
i^Si respac t ivelij Addl attention ma<j be uiarranted
BENDER. H ACRS - Advisorij Committee on Reactor Safeguards
SO/03/23 FRALEV.R F ACRS - Advisory Committee on Reactor
Safeguards lp 1S727 373 24 X Fiche 50-OOO, 82/06/28, 821 001GOOH
8210190653 PHO- I I-B2-1 1 1 an 02tO14,Unit 2 shut doun after determinlno
that presiurlier code safety valve design flou could not be
fullg maintained if called upon Seven-dag outage required
to change valves Exemption requested for Unit 1
IONATDNI8,A , DANCE, II C Region 2, Office of Director B2/IO/14
2pp 1574O 036 K4X Flche 30-369,82/10/14.8210190653
0210290353 Forwards UEFi B2-OI4/03L-0 Detailed event analysis encl
TUCKERiH D Duke Power Co 82/10/14 Q'REILLY.J P Ren'on 2,
Office of Director, 3pp 15353 043 24X Fiche SO-269, 82/10/14,
B2 10290355
--S21O150113 IE Insp Rcpls 30-269/83-35,50-270/62-35 J. 50-237/83-33 on
820908-10 No noncomp 1 iance noted llajor araas inspected
RCS leakage calculations
DUFJNETT, P T , JAPE, F Division of Engineering * Technical
Program* 83/09/31 4pp 1 S69a 311 24X Fiche 50-269.02/09/23,
0310150131
82102?0363 LER B2-014/03L-0 between 820616-0930. reactor bldn cooling
unit fan 1A tripped on loin cpeeri thermal overloads seven
times Cause untnoun Fan under surveillance Fan motor may be
replaced If cauil of trips cannot be determined
PETTV.J C Duke Pouer Co 82/10/14 Region 2, Office of
Director lp 1SB53 046 34X Fichu 30-269, 03/10/14, B31029O355
) .Requests relief from inscrvlce imp requirements
(hvdrstfltie J of Section XI of ASME Boiler b Pressure Vessel
Code
TUCKER. H D- Duke Power Co 02/10/04 DEN TON, H H Office of
Nut lear Reactor Regulation. Director STOLZ.JF Operating Reactori
Branch 1 20pp 15678 243 24X Fiche 30-269r 83/10/O4, 821O1 30290
02Q31VQ233 IE Info Notice 00-33, Suppl 1. "Leaking & Dislodged 1-125
Implant Seeds " Svc list encl
CODD,U I Division of Fuel Facilities. Materials & Safeguards
O2/KVQ6 Co.nsalldate<f Etflann Co of Neu York 66pp 15761 250
2flX FichE 50-000,03/10/06,8308190333
8210290WO Forwards LEU B2-01S/03L-0 Detailed event analy.is end
TUCKER, H D Dule Pnuer Co S2/1O/15 O'REILLY, J P Region B.
Office of Director 3pp 13953 307 S4X Fiche, 30-269,02/10/15.
8210290190
021029019? LER S2-019/03L-0 on B20917, rsactor protection SUB trip
pushbutton declared tecbnlcallg inoperable Caused bg
procedure deficiency which did not include required test,
Necessary procedures changed
PETTY.J C Dufce Pouer Co B2/IO/15 Reginn 2, Office of
Director lp 15853 290 R4X Flche 90-269, 82/10/13,8210290190
B2 10220426 Forwards Revision 5 tn response to IE Bulletin 79-02, "Pipe
Support Base Plate Designs Using Concrete Expansion Anchor
Dolt! "
TUCKER, H a Du*e Pouer Co 82/10/08 O'REILLY, J P Region 2,
Office- of Director 24pp 15778273 24X Fiche 50-269.82/10/00,
02SO320426
E+2101902H9 EM-S2-03IA on 83)013, order imposing civil monetary penalty
Issued to licensee Action based on failure to follow
procvdures affecting safe operation of facility
nARBEfl>G j AXELRAD.J Director's Office, Office of Inspection and
Enforcement 02/10/12 lp 15701 319 34X Flche 50-269,02/10/12,
8210150285
BSOB19O23a IE Bulletin 82-03, "Stress Corrosion Cracking in TNick-
Wal 1* Large-Diameter. Stainless Steel, Rec ircu lati on Su.s
Piping at DWR Plants " Svc list end
DEVnUNO, R C Director's Office. Office of Inspection and
Enforcement B2/IQ/14 Consolidated Edison Co of Neul York,
115pp 15S10 125 24X Fiche 50-000, 82/1Q/ 14. 0208190238
=1. Periodic operating reports fc related correspondence
3210190544 Forwards monthly operating repts for Bept 1982
TUCKER. H B Dute Power Co 82/10/15 Director's Office, Office
of Inipectfon and Enforcement lp 13751 343 24 X
Fiche- 30-269. 82/10/1 5, 8210190344
DOCKET 50-270 QCQNEE NUCLEAR STATION, UNIT 2
A Application/construction stage documents b correspondence
0210010000 Reiponds to FOIA request for 19 categories of documents re
nuclear reactor events fc safety problems Forwards document*
lilted in App A
FELTON. J, M Division of Rules and Record! 02/06/20 UDELL. R, A,
Critical Hail Energy Project ISpp 19727 005 24 X
Ftche- 50-000, 82/06/88, 8210010008
B204290048 Recommend* prompt attention b> given to problem of reactor
coolant pump closure stud corrosion detected at facilities,
Response by 8204IS requested
EISENHWT, D Division of Licensing 62/03/24 HAMAUER. S H
Division of Systems Integration (poit 011005} 3pp, 15745 370
24X Fi che: 30-000. 82/06728, BSi 0010008
F Security* medic*!, emergency d fire prnttttlon plni
8B10010352 Foruards revision to tafvguards conttngency plan Davit ion
withheld (ref 10CFR73 21).
TUCKER.H.B Duke Pouir Co 62/09/17, OENTQN, H R Office of
Nuclear Reactor flegulation. Director lp 19574 139 24X
Fie he- 50-269, 02/09/17,8210010332,
70
DOCKETED ITEMS
9210260 929 Agra*] u/determinati on to locate fire hate stations outaide
affected fire araai Change from earlier commitment
aceeptab 1 e
STOLIiJ F Operating Reactor* Branch 4 92/09/23 TUCKER. H D
Duke Pouier Co 2pp 15B30 [87 24* Fichu 30-269. 02/09/23,
62 10540329
9210040332 Appl (cation to amend Liotises CPR-3a,CPR-4/ i DPR-55 Amend
penuests deletion of To eh Spec A 4 2 i* lite emergency. drill
& definition of time within which redundant component test
mutt b-e performed" prior to performing mainfc per Tecti Spec
TUCKEB.H D Dukt Pouigr Co B2/09/27 DENTCrf, H H Office at
Huclear Reactor Regulation. Director 3pp 15586 104 34 X
Flche 50-867,82/09/27,6210040533
821Q040245 Proposed revision to Tech Bpec Paoaa 3 3-6 & 6 A- 1 re Hita
mBrginciji if MI I 6 Clra period uJthin uhich rntfundant
component tut must bo performed prior to performing malcit
Dukv Power CD 92/09/27 4pp 1550*. 107, 34X
Flche 30-267,63/09/27,3210040233
P Operating licent-t itage document! ! corraspondence
B210QBQ036 Responds tn FDIA Pequest for documents ro pins dailunaQ to
hold neutron shielding pads In place under accident
cond ( tlon-i Forwards documents lilted on App A
FELTOH. J M Diviiian of Rul and Record a Ba/OB/13 EDDLEMCvH,M
Public Interest Resear-ch Group in North Carolina 2pp 19669 340
24X FIcho SO-SA7, 82/OB/ 13, B2100BOQ36
B21O04QI07 Advia that util TPi(>Dnie to NRC 820318 1 tr ulll be
provided by 921009 Receipt of info from crane vendor fc
eilraord I hary analytical uori have delayed retpunie
TUCKER, H 8 Dukt Pouer Co B3/09/S4 DEHTDN, H fl Office of
Muclfar ila*ttor Regulation, Director STOLZ, J, F Operating Reactors
Brcicn 4 Ip 18581 024 SflX Fleha 50-269,62/09/24, B2I0040 1O7
aai0010S32 Application to amend Llcrnie* DPH-3B. DPR 17 { DPfi-55 Amend
rcquett* deletion "f Tech Spec 6 4 2 rs lite emerg^nc y drill
t definition at tlma ulthln uhlcli rariondant component tt
mu it be performed prior to ptrfc-rmins mjint per Tech Spec
TUCKER, H D DuV Power Co 62/09/27 DEMTCM, H R Office of
Nuclear Reactor Reoujatton. Dlpectai- 8TOL.Z,JF Qperatlna Heactpra
Branch 4 3pp 135B& 10<t 24X FSch *, 50-869, 82/0-9/27. 0210040332
62100402'lg Propoei) r*viion fco Tech Bpet P9 3 3-4 h {, fl-1 ITE sits
iMrgiricti drill (. time period within uhich redundant
component teit must be -performed prior to pur forming nmnt
Duk. Pou.r Co B2/09/2? ^pp 1S3&6 107 34X
FUhe SO-S
respons
B2IOJ90I45 Foruiardl Amend* 113,113 te 110 to Liceniei DPa-3B.DPR-47 t,
DPH-33. respect iveli/, safety evaluation 'j notitf of 1-giuance
J. *v tlab i 1 i tij Amends revise Tech Bptcs to allou full pouier
operation of Unit 3 during Fuel Cycle 7
WAGNER, P C Operating Rsactor* Branch 4 B2/09/B 1 ? TUCKER. H D
Dukt Pouer CP. 2pp 1S797 341 84X Flchi: 30-269, Ba/O9/29,
8210190154 Amndl 113.113 4 110 to LicinUt DPR-3B, DPR-47 ti DPR-59,
rapetlvelij, reviling Teck Spaci to allou full pouiar
oparatlon op Unit 3 during Fuel Cgela 7
BTOLZiJ P. dpBYitlng Reactors Branch 4 S2/0?/29 3lpp
4a 24X Tlche 80-3^9,83/09/89.6310190143
0210190161 Ba*ti| evaluation mpporttng Amend* US, 113 t, 110 to
Llcinie* DPH-aa, DPR-47 tt DPR~59,rpectivelij,
* OPfite of (Juc.l*T Ruetor Re?ul*tiinii, Dlrictor B2/09/29
137SB O1S 24.K Fich* 30-311. B2/09/B7, BZ10I90I4S,
App
BaiOl901(,7 Notice of iituanct i. avaflalilUtu of Amnd 113, 1 1 3 fc 110 to
LUiniet DPR~3BrDPR-47 & DpR-33, reipectlvel i
srOLZ.JF Operating R*etari BraneN 4 B2/09/2 1 ?
1B75B 018 24X FUhe; 30-247. 82/09/29.B21019014S
Bop
Reipondi to B20913 Itr r reactor bldg P UTOB iyt fotition
giVTi In B107Q7 t 17 Itrt i-tmaim vnchanged, Bcheduli for
tubtfiitttni) info inif(c*lna purge nji mitii opirabillta
82/O9/30-
LAIMAS, O.C flt(Ut*nt DirEtar for Operating flactor
TUCKERrH. B. Out* PngT Co, 3pp. 15745:33* S4X
Fieh 80-369.82/09/30,6210190323
satOlBOOSS R*ponidi to NRC B20&QB reiiut for add! Lnlo n dasuac
itatlon electric diitrlbutlen Kit voltagu, Riouittd in.# o
Kftftttd by 621022.
TUCKER, H B. Dutf Powti- Co. ea/10/OB. DENTON.M R Offlct Cf
Nuclejr Rector RefluUtlan, Dinctor, aT0U,JF Operating nnn
Branch 4, IB, lS7ao.010. 24X Fiehl- 5ft-2o9,B2/lO/OB, 9210180038.
eaiOlBOOfcQ Forwards partial
technical evaluation rupt .. ,, ,
UUREO-0612
TUCKER, H B- Duke Pnuer Co B2/10/O8
Nuclear Re-actor Regulation, Director
Franklin Research Ctr !
if heavy I odd t, per
DENTOW, H ft DfF,ce i
STOL2. J F Cp.ratsng
6210210131 Re fi p on(! , to NRC B3090B Itr transmitting t ec hn,c a ] ,v.lu,(
rept on .m.rg.ncy feedwater y, S, mav not mB / t ^, t *! ' *
criteria for leilrnic qua I if ication, hut ui 1 1 remain
functionally operable Hurinp QBE
TUCKER. II D Duki Pouier Co B2/10/13 OENTON. H R Of He, of
Nuclear Reactor Regulation, Director SrQL*,JF Dpr*ttn 9 Bf.e*
Branch 4 4p o 1 976A 356 24X F.che 50-269, B2/ loySi aa!IOiai
B210210407 AnplUation to antvA DLs.revj.ing Tech Spec 3 l a |]oiT-.
full power operation O f Unit I for interim period until
DENTON. H R Offlc* ct
STOLZ. J F Op.ral , n . Ft,
50-369,
iiBn s
TUCKER. H D Dol* p Dule r Co 82/10/14
Wuciear H,, e t or fl. 9U latin, D!rector
Branch 4 Bpp i5764 038 34X Fiche
8210210411 Propoxed revHion to Tech Spec 3 I al lomng full
operation uf Unit 1 for inter im per iod until appropriate
safity valve ring setting can be implemented
Outa Pouer Co B3/1Q/14 Ip 15764 04B 34X
Flche 50-2i9, aa/10/tl, 8210310407
Inspection reports. IE Bulletins t correspondence
9210070007 Reapunds to F01A requeit for eight catenon*. ,
item generators i itetin turbines App A documents pravii
in R Udell FD Ifl F1eq.UBst ai-313 Formards documents llttei
App B
FELTON.J fl Division Of Rules and Records 02/09/10
Hinthrop, Stimson, Putnam & Roberts 9pp 15645 063
Flche SO-000, aa/Oa/10. B310070007
LOW, D
34X
-i .1
B2I0070172 FcTLUrdt info ra iteam oenerator inteoritii (, !
operating PHR,oer 75O330 fe 21 request, Details oAnis,,
Including Jafeit inrflca tions, tube plugging criteria & tubii
plugged uill not be provided ejcept for Point Beaeli I
OOLLER.K R Division of Reactor Uicensing (NRR-1975 c-nlul
73/03/21 MACCftRV.R R Divismn of Technical fi e v( e ftfla-igj'
onlyl 9pp. 15445 196 24X Fiche 50-000. B2/Osy 10, aai007QOO7
8S101S0349 PoruiarJt r.aults of invest, os t, on O f j tVT! ?4 of , E ,,.
Hepti 50-BA9/ea-21,&0-270/83-2l fc SO-2B7/B2-21 Daadtlrre
values Fop gamma ipectroscopu, analyses of uaste gas ti lv*r
leollte cartridges uill cause only insignificant irror*
TUCKE,HO Duke Pouer Co H2/OB/17 O'REILLY.JP Iteolan 3
' Ct0r app 157 4 2i * 24X FlqnB 50-269. BB/Oa/U.
8310010117 Foruardi IE lusp RepU 30-369/82-33,30-270/82-331;
30-207/92-33 on B20ai7-20 No noncompllsnce noted
2fS H :, C - Dfvi ' ll n op Project fc Resident Program.
TWCKER.H D Duke Power Co 2pp 15566 019 sax
Flche- 50-269, 83/09/02.8210010117
8810010184 IE Insp Rents 50-269 /B2-33, 3D-S70/B2-33 4 50-287/83-3*
nn 020917-20 NO noncomp 1 ia n ce noted Major areas iTiipectld
action on previous enforcement matters, au . i 1 1 airy f.edujOr
head-er rapair t> Jniervlce ittip procedures
R , BL.AKE.J J Dwliion of En H ine*rlns t T.chnle.l
*
B2100101SB For-uiardi IE Insp Rcpti 30-2i9/B2-30, 50-270/82-30 L
30-237/82-30 on 8S07[i~OaiO Ho noncomp 1 ianc e noted
OANCE.H.C Division o* Project lifiesiilent Proarams
TUCKER, KB Duke Pou,ar Co Spp IS567 S5S 24?
Ficne SO--S69, Ba/09/02, B21001015B
0310010166 IE Imp Reipts 50-269 /aa~30. 50-370/83-30 -
G20MA-QS10 Mo nt.ncoflipli.hce noted M.jor ar. al inspettetf
operationi. survHUanci testlno-malnt.NUREO-O737 mods tr
refueling ictivititt
ORDERS, H-, FALCONER, D , DRYftNT. J C Diviiion of Projec
6310010433 Aek receipt of B20B05 Itr informins NRC of item
torrtct violation, noted in IE Inp Reptf 50-fl6?/B3-33
90-270/B2-S3 ti SO-aB7/0a-23 -*w -IJ,
LEHIS.R.C. Divl*ion of Project S< Resident Progcams
TUCKER, H B Duke Power Co ip 1SS70.1B2 24k
Flche: 90-847, B2/09/17, 821001043B
DOCKETED ITEMS
71
-B2-100104&3 Responds to NRC S207I2 Itr re violations noted in IE Insp
flept( 5O-3A9/S3-23, 50-27O/92-23 ft 50-207/B2-23 Corrective
actions personnel counseled t> valve 2HP-14 cut out &
prop IT ]<t re installed
TUCKEfl. H B Duke PniuBr Co 92/09/05 'REILLY, J P Region 3,
Office of Director 4pp 15570 183 24X Fiche 50-269,03/09/17,
93100 I 045B
-6210010468 Forward! IE Imp Repts 50-269/B2-33, 5O-270/B2-23 81
SQ-S87/S2-23 on B2O510-0610 t, notice nf violation
LEWIS, R C Division ot Project t Resident Programs 62/07/13
.PARKER, W Duke Power Co 2pp 15570 187 2flX
Ficne 50-269,82/09/17. B2100I045B
--B210Q10471 Notice of violation from map on B20'!10-O610
* Division of Project f. Resident Programs 92/07/12
15570 109 24X Fichfl 50-269. 92/O9/ 1 7, S21O01045B
2pp
--B2I0010474 IE Insp Flepts 50-269/B3-23. 50-370/82-23 & 50-287/82-33 on
B-aOSIO-OSIO Noncnmpllance nntcd failure to follow procedures
resulting in plant trip & inadequate procedure resulting In
improper reassembly of safety-related valve
CrtDEflS.W . FALCONER. D , BRYANT, J C Division of Project << Resident
Program 82/07/07 12pp 15570 191 SIX Fiche 50-269, B2/09/17,
0210010453
Forwards IE Insp Repts 50-269/82-32-30-370/82-32 &
50-267/82-32 on B20B17-IB No noncornp I lance noted
DANCE, H C Division of Project t> Resident Programs 82/09/17
TUCKED. H D Duke Power Co 2pp 15703 267 34X
Tithe 5O-269. B2/09/17. B21O1 50253
6210150363 IE Insp Repts 5O-269/B2-32, 50-270/82-33 fc 50-267/82-32 on
O2O817-IS No nancompliance noted Major areas Inspected lab
QC (- revlou of radi ochemi stry procedures i records
EWiNS.C . MDNTOGMFRV. D II Division of Emergency Preparedness i
Operational Support 82/09/15 3p p 1*1703269 34X
Ficlie 50-269, B2/09/17, 9210150233
&21O150131 Forwards IE Insp Repts 50-269/62-35.50-270/82-35 (.
3O-287/B2-39 on B2090B-10 No noncompliance noted
DrtlJCE, H C Division of Project i Resident Programs da/09/23
TUCKED, H D .Duke Power CD 2pp 15698 312 24 X
Fiche 50-269,63/09/23,6210150131
-'0210150143 IE Insp Repts 50-369/92-35, 50-270/82-35 *< 30-2B7/B2-3B on
830908-10 No noncompl lance noted Major areas inspected
fiCS leofcags calculations
BURNETT, P T . JAPE. F Division of Engineering ( Technical
Projrams 02/09/21 4pp 1 569B 314 24X riche 50-S69. 82/09/23,
6210150131
Q21OI30290 Requests relief from Inservite Insp requirements
iftigdrosta t lei of Section XI of AS HE Boiler t Pressure Vessel
Code
TUCKGft.H D Duie Potuer Co 82/10/04 DENTON, H It Office of
Uuiclea-r Reactor Regulation, Director STOLZ.JF Operating Reactors
Branch 4 2Opp 15676 213 24X riche 50-269. 92/IO/Ofl, 9310130290
B20B190233 IE Info Notice BO-3S, Buppl I, "Leaking & Dislodged 1-18!)
Implant Seeds " Svc list encl
COBD.L I Division of Fuel Facilities, Materials fc Safeguards
92/10/06 Consolidated Edison Co of New Yard 66pp 19761 230
2AH Fiche 50-000- 62/10/06, 8208190233
8SlO220a26 Forwards Revision 5 to response to IE Bulletin 79-03, "Pipe
Support Bain- Plate Designs Using Concrete Eipansion Anchor
Bolts "
KICKER, H B Duke Pouer Co HS/10/OB O'REILLY.J P Region 2.
Office o* Director 24pp 1577B 273 24X Fiche 30-269,82/10/08,
33 102 20426
620Bi90a3H IE Bulletin 62-03, "Stress Coirosion Cracking in Thich-
l^all. Large-Diameter. Stainless Steel, fiec irculation Sy
Piping at DWR Plants " Svc list end
DEYDUNfi,fl C Director's Office, Office of Inspection antf
Enforcement 82/10/11 Consolidated EdUon Co of Neui York.
ll$t? IBfllO 125 24X Fiche 50-000.92/10/14,8208190238
S Reportflhle occurrences, LERs t related correspondence
B21O190653 PNQ- II-B3-1 1 1 on 931014, Unit 3 shut down after determining
that preisuriier code safety vatv design flow could not be
fully maintained if called upon Seven-day outage required
to change valves Exemption requested for Unit 1
IONATONISM , DANCE.H C Region 2. Office of Director 82/1O/14
2pp 15740036 24X Fiche 50-269,33/10/14,6210190633
B21O190&95 00 on 821014. Unit S core relief valves declared inoperable
du* to analysis prompted by EMJ safety concern Unit 3 valves
mere offsite undergoing ring adjustment Immediate ahutdoiun
of Untt 3 commenced
* Duke Poiuer Co 32/10/14 Region 3. Office nf Director lp
1S736 200 34X Fiche 50-270,82/10/14,82101906^5
B31O290083 Forwards LER B3-013/03L-0 Detailed Event analysis encl
TUCKER. H B Duke Pouer Co 62/10/15 0'F!EILLV,J P Region 2,
Office of Director Hpp 15B54 Ofl7 24X Fiche 30-270,62/10/15,
8210390083
8210290087 LER 83-01 2/03L-0 on 020916, turb 1 ne driven emer jenc y
feoduater pump declared inoperable when trip/ thrntt le valve
2K5-74 diicovered tripped In closed position Cause not
known Valve remt Video alarm uill be repaired
PETTY, J C Duke Power Co 92/10/15 Region 2, Office of
Director lp 15854 049 24X Fiche 50-270,02/10/15,9210390083
DOCKET 50-371 VERMONT YANKEE NUCLEAR POUER STATION
F Security' medical, emergency b fire protection plans
B21O120346 Informs that Revision 6 to physical security plan
acceptable Encl to B3072O 1 tr transmitting revision withheld
(raf 10CFR73 21)
VASSALLQ, D D Operating Reactors Branch 2 B3/09/22 SINCLAIR. J D
Vermont Yankee Nuclear Power Corp 2pp 15671 101 24X
Fiche 50-371, 82/09/22,9210130346
0210310331 Forwards IE Safeguards Imp Rept 50-371/82-15 on B2072B-30
Mo noncomplianc* noted
MARTIN. T T Division of Engineering & Technical Programs 83/10/04
SINCLAIR. J D, Vermont Yankee Nuclear Potner Corp 2pp 15766 331
34X Fiche 50-271,82/10/04,0210210331
B310aiO23B IE Safeguards (nsp Rept 50-371/82-15 on 820738-30 No
nnncomp t lance noted Major areas Inspected facility
organ! latlon, measurement & controls, shlpp Ing E> receiving
storage & internal control & physical inventory
DELLA RftTTA.A , WOLTNER.E F . OODY, A T Division of Ennineerinn 6
Technical Proorams B2/09/30 7pp 15766 333 SAX
Ficha 50-271, 83/1O/04, B31O210221
&21Q2704S6 Releases public version of revised emergency plan
FELTON. J M Diviilon of Rules and fleeords 63/10/08 Document
Management Branch lp ISB33 OS4 SIX Fiche 50-271, 82/1O/OB,
B21027043A
3210270430 Forward! public version of Revision 4 to emerg*
MARKTiD, I Vermont Vankee Nuclear Pouer Corp-, MARKT, D
Atomic 1 oc trie Co 02/09/30. Office of Nuclear Reac
Regulation. Director 3pp 15B33 OSS 24X Fiche 50-37
S21 0270426
8310370432 Public version of Revision 4 to emergency plan
MUflPHV.U P Vermont Yanfcae Nuclear Pouer Corp 82/09/2B
15933 097 24X Ficha 30-271, 93/10/08, 8210270426
9210180190 Foruards adifl info requested In 920812 telcon re pi
alternate shutdown sys Encl info addresses separate routing
of cables for valves FCV 3-17 it FCV 2-1S (c RHR waives
V10-I7 & V10-1B
MARSOLAI8. L D Vermont Yankee Nuclear Power Corp aa/IO/li
v~A59ALUO,I> B Operating Reactor* Branch 3 Spa 15719 IK
Fiche 30-271,88/10/13.8210180190
R Periodic operating reports & related correspondence
83101905*15 Forwards monthly operating repts for Bept 1982
TUCKER, H B Duke Power Co 83/10/15 Director's Office, Offict
of Inspection and Enforcement lp 15751 343 H4X
Fichu 50-269,82/10/13,8210190544
B2IOI90552 Monthly operating rapt* for Sept 1962
REAVIS r J A Duke Power Co 82/10/15 16pp 15751 344 24 X
Fiche 50-269, 82/10/15, 8310190544
B2102S0411 Ack receipt op 830708 Itr Informing NFIC of stps
correct violations noted in IE In*p Rept 30-271 /B2-05,
ALLAN, J.M Region t, Office of Director 82/10/12
Vermont Yankee Nuclear Pouiei* Corp lp, 13760 26 Z4X
Fiche 90-271, 02/10/12,8210320411
8210220410 Responds to NRC B20722 Itr re violation* noted ir
Bept 50-271/B2-05 Corrective action* *tudy' performed to
determine hoiu Intsnt of augmentftion goals of NUREO-0654
could be achieved after declaration of emergency.
MORPHY.H P Vermont Yankee Nuclear Poiuer Corp. 82/09/00
SMITH. If Division of Emergency Preparednis* b Operatic:
Support. 29pp 157BO 32? 24 X Fiche 90-271,82/10/13,821
72
DOCKETED ITEMS
2102BO13.4 Reloaies public version of emergency flan Itrs of agreement
FELTOH, J M Division Of Rulus and FUcords Q2/1Q/12 Dacuiuent
Management Branch lp 15962 346 Z1X Fichu 50-271.02/10/12.
0210530136
0210260135 Foruiaria public version of errata to Change <V to em&rgencij
plan App E, com tiling of Itrs. of agreement between 31e*ne
& States of VT,MA t NH, NCAA. US Air Force Si various local
dospi !i businesses Receipt Form end
I1ARKT.D Vermont Yankee -Nuclear Power Carp rtARKT. D Yankee
Atomic Electric Co 83/10/03 Office of Nuclear Reactor
fiegulatior,, Director lp 15043 24? 24X Fiche 50-2
B21Q28Q14-3 Putllq veiaion op errata to Change 4 to emergency plan App
E, consisting at 1 trs of agreement betuaen licensee t< States
of VT.Mft (* NH, fJOAft. US Air Force t. various local liosps U
businesses
a Vormont Yantme Nuclear Power Corp 1 Yankee Atomit Electric
Co 92/10/05 Plnp 15B62 230 2anriclie 50-371 . B2/ 10/13.
Q Inspection reports. IE Bulletins t- c orresp ondenct
B2lQ05Q'l<ia Forwards request for add! info based an revie
IHO responses to IE Pullet in BO- 11 re masonry wall de
VASSAL L 0, D D Operating Reactors Branch 2 S3/OG/30
Vermont YanSee Nuclear Power Corp Spp 15612 357
Ftch 50-271,92/06/30,0210050148
at SOOIOt I
ign
StNCLfilFtiJ
B2l007037i Foruards IE Imp Rept 50-?71/H2-li on 820B02-3O Ho
none omn 1 1 anc e noted
STARDBTECKt, R Division Of Proje^ 6 Resident Programs 02/09/31
SINCLAIR. J Q Vermont Yankee Nuclear Power Corp Spa 1'Sft'jn 3.1(1
2-U Ficne SO-S71pB2/09/34,H21oa70376
B2IQ07G373 IE Insp (lept 50-271/82-lfc on B20B02-30 No noncump 1 i ancr
noted Major arsai inspects!) previous insp find inos, plant
operations, physical security, operational cur veil I mice,
nvairit activities ', saFeguard sos operabilit^
RAYMOND, W J , OALLO, R M Division of Project t, Reliant ^ s , r ^<.
0^/09/22 I6pp 13^34 001 24X Fiche 30-P/l, H2/09/24, 031, 0070^6
P OpeTating license stage
correspondnnc e
92IOE101B5 Forwards safotij evaluation of methods met For anal-jut of
phij)lc= t thDrmnl-'Aijdraiil 1 c psrf ormante
VASffALLO, D B Operating Reacfcon Branch 3 B2/O9/15 SINCLAIR,,! D
Vermont VanSee Nuctflar Power Corp 2fp 1577fl 370 3flX
Flclia 50-271. S2/O9/ 15. B31 0310165
eaiOOlQIGd Advises that all future cm respond ente from lloninti I uil]
be addressed Eo UP Murphy Change will assui e Hirect
communication to senior licensee mg t i-a NF1C insp findings,
enf arc ement actions or requests
HAVNES, R C Region I, Office of Director 02/09/27
Vermont Yankee Nuclear Power Corp 3pp ] I5b7 PJ7
Ftche 30-S/l, 03/09/37. B21CO10136
MUFIPHV.U V
E331OaiO200 Safety evaluation Bup porting reload analytic methods based
am reviBU o f technical repts tubmitted hij uttl PC analgBii
of physics ti thormal-^iudi-aul i c performance
BROOKS, W . HBlliY . HOQHeV. V Office of Nuclear Reactor
Reoulation. Director B2/09/1S 27pp- 19774 372 34X
Ficfte 50-271, 02/09/15, 02J021OIB3
3210210101 Forward* Amend 73 to License DPR-aa, lafetu aval uation I,
notice of iSBuanca 6 availability rtmend Incorporato* rovlled
cor tlierwal IITJ d" rau 1 1 c Uniting conditioria of operation
during Fuel Cycle 9
RODflEY.V L Dperntlng Reactors Dranch 2, B2/09/16 SINCLAlfiiJ
Vat monfc Yankee Nuclear Powev Corp Bnp 1377^ 301 24X
fitlia SO-37I, ESfQI/ta, 931Q2KHOI
B210210112 Amend 7ff to Litensa DPrt-?Q, chano Ins Tach Specs to
Incorporate revised cora thermal hydraulic limiting
conditions during Funl CucU 9
VASSALLO.il apec-atinj Reaetors Branch 2 aa/OW16 "PP
15774 003 34X Ffcht 50-27! . BS/09/ta.
8310210121 Safety evaluation supporting Amend 72 to Uiceni DfK-SS
" Office of NucUar Reactor noguUtion, Dlrecfcor B2/09/ti 4pp
13771 307 34X Fiche 50-271,03/0^/16,0310310101
62I021OI37 Naties of usuance 6
RPH-SB
VASSALLOi D B Operating Reactors Branch S 02/09/16
13774 311 E4X Fi the- 80-871- 82/07/16,9210210101
labtlitij af Amend 72 to Llrtnts
2PP
Foruijrdi IE Insp Rept 50- 271 /fl?-i 4 an Ra07Q(,-30 t noitct
of violation
aTARQSTECKI.R Division of Project fc Resident Proprams CJ/O9/?J
BINCUAIBiJ Q Vermont Yantee Nuclear Pouer Corp 2pn 15701 JH
21X Fiche 50-271 , BS/09/27, H3IOI 50346
fiotite nf violntion from insp on B20706 30
Division of Project t Resident I'rograms QS/09/P7
19704 336 24X Firhs 30-P71. 02/09/57. B21 01 503th
~eaiO!50274 IE Insp Ropt 50-271/B2-14 on B207Q6-30 None umpllirti:
noted Paj lore to post hot jpot rfldlation area per plant
Administrative Procedure 0503 tt Teth Specs
HAVWQHD.H J . CDLLIN3,B J , GrtLUl. R M Division of Project &
RniHent Programs 02/07/31 20pp 13704 337 24X
Fiche, 50-271,02/09/27, 9210190246
S210Q40H3 Cc-miients on systematic assessment of licunsee perfcrnjr.tj
rspt, ilUcutsviI *t BS010B meetinj Hept fair appraisal of
activities for rept period
MURPHVi H P Vermont Yankee Nuclear Poiuor Corp E12/OW20
STrtnOSTe<:Kr, R Division of Projoct (. Hoidenl pi ogramt nB
15SH1 144 S4X F(c^a 50-2?!, S2/09/ES,
B21O21OBS1 Foruardi IE Safeguard* Insp Rept 50-371/np-ls nn
No nonKonpl lance noteU
MAR.T1N, T T Division of Engineering t. Technical I'roarani
SINCLAIR, J B Vermont Vdutoe Wuclsar Pouier Corp PDD
24X Ficha SO-H71. 62/10/04,8210210331 ~ YV
8210080113 Coramsnt* on sgitemaSlt a^tatiroent of Hcsniee pBrforJ
rept.dUcuBmil t 820906 seating Hppt fair appraisal of
activitts far rapt perlad
HURPHYi W P Vermont Yankee Nutltar Pcuar Corp H3/O9/as
STAROarecm.n Division of Project & t1. taunt "rograroi 3np
13SB1 Ifll. 2ax Ftche 30-371, BZfQI/SB* 62100-101 13
8210210239 IE Safeguards Insp Rept 00-871/68-13 on HP072(1-,K>
nancompllanm noted Major areas inspected facility
organiladon.fflBasurBinen t t, controls, shl pp Ing It receiving
Itorage 6 internal control 6. physical invuntoru
DELLA RATTA.A , HOUTOER , E F , GODY. A T Division a p b n gi,,*
Jsctinlcal Prooram* 82/09/30 7ff O766 333 aiX
Fichn, 50-37 1,82/10/04,8310210221
8210120343 R.quiU listing of submittalt re interview UUn D proovam
ulthln 3O tfav*
Yl\SBAU-0,l> Q Operating Reactors n ranch 3, aa/0?/S fSIWCLAIR.J !J
Vermont Yankee Nueir Power Copp 2np 15i9J 03? 24y
Flch 50-271, aa/C^/SB. 0310120343
0209110333 IE Info Notlc* ESO-3S, Suppl 1, "Leaking (. Dlli
Implant Sf*di " 9vc list end
CDBB-.L 1 Division of Tuel Pacilitles, Materials I, Bad
02/10x06 Consolidated Edison Co of New York &6op
24X Flch 30-OOOiBa/10/Oi, BEOB190233,
15741
B3KHSOt47 Informs that revision to administrative ssetlon of Inch
Soc re shift mannlnj r*qu Irnmints ti workinj hour
nuidelln** rot appropriate BultatU controU alreadu ImpoinS
( mill be subj to Insp * tnf arc mint by ftenlon J
MURPHY.W P Vermont Yank** Nucl*r Pouir CDPB
EIBENHUT, DO Division of LieinUno lp, 13709023
Flthe 00-871, B=/10/13,saiOlS0147 iva via
821013080? EN-aa-033 on or about 921013, notice of vtoUtlan t, <nc,\i,
civil prnaltif uiiU n> iued Action based on violation r
failure of station prtonnel to promntlo rocogntie ch*nai
In itji of tafitu-relattxf .qulpmtnt *
CKAIO.J , AXEUIAtW H.flion 1, Office of Director
13703 241 24X FUh 30-371,82/10/12,8210130867
.S* m "BMie-t.1 Hqdrao.n Pen.tr-tion.
V.nL DP"'**'"! HDr Branch 3 62/10/14 BIHCLAIR.J D
VBPmont Yanfci* Nuel*r Pounr Corp 1 15B34 3S9 Sx
Fih.50-B71. 93/10/11,
Ack receipt of aao-JOB Hr informinfl NflC of ttins tnim i
eopj-ec* viaUtlons noted in IE Insp Rept 50-271/02-03
ALLAH, J M R.gton I, Office of Director 82/10/1K MUHPWV U f
Vermont Yankee Nuclear Pouor Corp U 187BO 33B 2iv
Fieh. 50-271, B2/10/12.flZloaa041l o o -rfM x
DOCKETED ITEMS
73
-9310230418 Responds *o NRC. B2O722 Itr re violations noted in IE Insj
Rtp'. 30-271 /Q2-05 Corrective actions study performed tp
determine ncu intent of augmentation goals of NUREG-0654
could be achieved after declaration of emergency
MURPHV.W P Vermont Vaniee Nuclear Pouer Cnrp Ba/09/09
SMITH. C H Division or Emergency Preparedness ', Operational
Support 21pt 157BO 229 24X Fiche 50-371, 83/10/12, 031022041 1
B2100&0433 Eiemption from requirement! of Section IV F 1 nf App E ta
1QCFR50. to allow next full-scale emergency preparedness
eiercise at facility to be conducted on or about 320929
Eva 1 nation enc 1
EIGENHUT, D Division of Licensing 02/09/33 Public Service
Electric tr Qas Co of Neu Jersey 3pp 13636 230 24-X
Flche 50-273.03/09/23.8210060131
2031902.30 IE Bulletin 02-O.J. "Stress Corrosion Cracking in Thick-
Mall . Large-Di ameter. Sta in I ess Stool, fiocircu lation Sys
Piping at BWH Plants " Gvc list end
DEYOUNC.W C Director i Office. Office of Inspection and
Ent'arcenent B3/IO/14 Consolidated Edison Co of New Vor V
Il5pp 15310 125 34X Fiche 50-000.82/10/14,8208190238
ft Periodn
rre spondcnc
EJ7IOI3O1.B9 Forwards monthly operating repl fpr Sept 19B5
HLOTPHV. W P Vermont Yankee Nuclear Power Corp 82/1O/00
Wanagmnetit Information Branch lp 15674 107 24X
Ficfie 5O-271, 03/10/00, B31013O1B9
P Oper-ating license stage documents d correspondence
8210050-405 Forwards documentation of satisfactory completion nf
requirement! contained in 790921 1 tr re TMI Action Item
II E 1 1 concerning auxiliary feeduater sys
VARCA.S A Operating Reactors Branch 1 03/09/20 UDER1TZ.H A
Public Service Electric Si Qas Co of New Jersey 3pp 1 5626 377
34X Fiche 50-372.82/09/30,8210050495
8210050490 "Suppl to Safety Evaluation Kept for Salem Units 1 t. S
Imp lementat ion of Recommendations for Auiiliary Feediuater
Sys "
o Office of Nuclear Reactor Regulation, Director 82/09/20 3pp
15621, 230 SIX Flche 50-272, 02/07/20, S2 10050405
S2IO139193 Monthly operating rept for Bept 1902
Vermont Vantee Nucle
er Corp
App
15674 1OB 34X Fiche 50-271,02/10/08,6310130189
5 Reparlable occurre
lated cof respondent
6210130603 Advi ses that installed monitoring sys required by TMI Action
Items II F 1 4, II F 1 St. II F I (.acceptable t, items
considered closed
VAHQA.S A Operating Reactors Branch 1 02/09/30 UDEHITZ.R A
Public Service Electric i Oas Co of Neui Jersey 2pp 15692 349
24X Fiche 30-272.82/09/30,8210130403
&31O19OQ22 Forwards LER B2-I120/O3L-0
PELLETIEK, J P Vermnnt Yankee Nuclear Poiuer Corp 02/10/05
HAVNES. R C Region 1, Office of Director lp 15742 139 ^4X
Ficho SO- 271. 03/10/05,0310190022
--621O19OO2 1 ? LER 02-02O/03L-0 on 020902. indication on RHR 89D blinked on
' f aft at 3.700 gpm floiu rate Indication lost uhen valve
shut Caused by loose wiring on valve limit SLJI tch resulting
in los* of position indication Connection tightened
PELLETlERrJ P Vermont Yankee Nuclear Power Corp 02/10/05
Region 1. Office of Director 3pp 15742 140 34X
Fiche aO-27 I. 02/10/OS, 021O19O022
orwards LEU 83-021/03L-0
PELLET1ER.J P Vermont Yankee Nuclear Pouer Corp 02/10/12
HAVNES.R C Region 1. Office of Director lp 15766 343 34X
Ficne 50-271, 83/10/12. 8210210304
-621O210214 LER 82-021/03L-O on 020914, while performing pump opnrahilllg
surveillance on RC1C sys.RCIC tuibine tripped on overspeed
Caused by failure of electric governor module Module
replaced Bad transistor found in tach generator
PELLETIER, J P Vermont Yankee Nucleai Pouier Corp 02/10/12
Region I. Office of Director lp 15766 314 34*
FichB 30-a? 1,03/10/12, 02102I03Q4
DOCKET 50-272 QAt-EM NUCLEAR GENERATING STATION, UNIT 1
f Securityp medical, emergency i fire protection plans
6.21Q35O245 Foruiards 1902KEHA/NRC observed eierclBe scenario for B21013
eiercise Revisions reflect changes agreed upon during B20430
meeting w/NRC t FEMA
ZUPKd, J M Public Service Electric & Oas Co of New Jersey
S3/Q9/16 HAYNE9.R C Region 1, Office of Director IflBpp
157E? OO2 24X Flche 50-272. 03/09/16, B2IO250245
S3 1 036QS 1 a Foruarils eienption from requirements of 10CFR50 40 re Fire
protection of safe shutdown capability
VAROA. B A Operating Reactors Branch I B3/09/16 UDERlTZ, R A
Public Service Electric t Gas Co of Neui Jersey 3pp 13330 160
24X Fiche 50-272,82/09/16,0210360510
5310190047 Informs that util rod e> change methodologv not approveil
because of ca Iculalional content of reactivity measurement
Neui submitt*! or return to ooron dilution method requested
VAftGA.B A Operating Reactors Branch 1 82/09/29 UDERITZ.R A
Public Service Electric & Oas Co of NBU Jersey 3pp 15761 041
24X FichB 50-272.03/09/29,8210190047
S310190507 Application for amend to Licenses DPR-70 t. DPH-79, revising
core 1 imits, f rac ti ona 1 thermal pouier factor limit,
performance of RCS mater inventory balance & boron
concentration b contained vol limits
LtDENiE A Public Service Electric fr Oas Co of Neui Jersey
82/10/05 VARCAi B A Operating Reactor! Branch 1 2pp 15063 134
34X Fiche 50-272, 82/10/05, B21 01 90507
0310190515 Proposed Tech Specs supporting application to Amend Licensen
DPR-70 t- DPR-75, revis ing core 1 Imits, frac tional pouer
factor 1 imi t, performance of RCS uater inventory balance b
boron concentration ' contained vol limits
Public Service Electric t< Oai Co of Neu Jersey B2/10/05
I7pp 15863 126 24X Fiche SO-27B, B3/IO/05. S210190507
8310370136 Licensa Change Requests 82-17-30-31 b S3 to Licenses DPR-70
'/ DPR- 73 Changes involve inservlce insp of snubbers, steam
generator insp ports, containmen t ventilation valve insp b
surveillance functional testing
LINDEN, E A Public Service Electric & flag Co of Neu Jersey
B3/10/07 VAROA, S A Operating Realtors Branch I 3pp 15837 036
24X FichB SO-27H, B3/10-/07, 8210270136
8210270113 Proposed Tech Spec changes re inservice insp of snubbers,
installation of iteam generator insp port ii pressure drop
test 81 reactor trip instrumentation
Public Service Electric tt Oas Co of Neui Jersey 82/10/07
8pp 15027 029 24X Fiche 50-272, B3/10/07. 8210270136
9310180009 Advises that design changes satisfying concerns iprss(l in
020917 request for addl Info r reactor protection sy/ESF
actuation lys initiated Tech Specs uill be modified to
address setpoint changes
L1DEN, E A Public Service Else trie 1 Qas Co of Meui Jersey,
BX/ 10/08, yAROA. S A Operating Reactors Branch 1 lp 19720 024
24X Flche SO-272, B2/IO/OS, 8210180009
Exemption from requirements of 10CFHSO 4B re fire protection
of safa ahu tdouin capability
EIEEHHUT, D Division of Licensing 02/09/16 Public Service
Elnctric (. Oas Co of Neu Jersey 4pp 15830 171 24X
Flche- &0-372,S2/09/!6,82!Q360518
831024052^ Safety evaluation supporting liceniee request for eiemption
from -requlremBnts of 10CFR50 40 re fire protection of safe
shutdown capability
t Office of Nuclear Reactor Regulation Director 82/09/16 3pp
IS33O 175 34X Fiche 50-273. S3/09/16, B3 1026051S
B210Q&O431 Foruards eremption from requirements of Section IV F 1 of
App E to IOCFR50. to allow nBft full-scale emergency
preparedness eiercise at facility to be conducted on or
about B20729j granting 020709 request
VAHOA. 3 A Operating Reactors Branch 1 S2/09/33 UDERlTZi R A
Public Service Electric & Oas Co of Neui Jersey 3pp 15636 237
2-U Fich- 80-272, 02/09/23. 821 00^0431
0310020375 Informs that revleui & plant re Cycle 5 reload care is
expected to achieve burnup of 11500 HUD/MTU Startup physics
testing uill include control rod drive tests b droptlmi (c
critical boron concentration measuremantf
LIDEN, E A 'Public Service Electric t< &as Co of Neu Jer*ey
83/10/14 VAROA, S OperatJno Reactors Branch 1 4pp, 15770 191
24X Flche 50-272, BE/1Q/14, HE10E30275
0210270352 Forward! Amends 48 t, 13 to Llonces. DPR-70 ti DPR-79,
rtiptc t ively, afty evaluation & notice of issuance &
availability Amend; revises process b effluent monitor* to
agree uf/ei lit ing plant conditions
R099, W J Operating Retctors Branch 1 83/10/10 UDERITZ.R A
Public Service Electric lc Oas Co of Neu Jirtey 2pp 19S34 31B-
24X Flcha S0-272i 83/10/ IB, 0210270332
74
DOCKETED ITEMS
13 -to l_icenss DPR-70 It DPR-7S, respict ivt 1 u>
ffltient monitors to agree w/eilstlng
-S2I027Q355 Amends
reviling process
plant eondi 1 1 ons
VAFICA.S/i Operating Reactori Branch 1 B2/1O/IB
I5S34 320 24* Flch( SO-272. H2/10/ IB, B210270332
14pp
3210210464 Forwards IE Insp Rupts 90-272/83-25 t, 50-31 1/82-24 4?
820901-37 & notice of violation
ETASQSTECKJ.R Division of Project b Resident Progr*ni OSfK
UDEHITZpR A Public Service Electric t> Oat Co of Him Jinif
19763 DIB 24* Fiche 50-272, 02/10/06, Q3102IO-ti,4
9310370360 Safety evaluation supporting Amends 49 & 13 to Licenses
DPR-70 it CPF-73, respectively,
* Office of Nuclear Reactor Regulation. Dir*cfcor 92/10/19 ipp
15034 331 24X Fic/ie 50-272. B2/10/1B. &21027035S
--B31027O36i Nolle! of issuance fr availability of Amend* 49 t, 13 to
License* DPR-70 (. DPR-75, resp ti v Ig
VAR8A.S A Dp a rat ins Reactors Branch 1. B3/IO/1B Sff
15934 340 24 X Fichs 50-272, B3/10/IS. B21 0270332
Inipection reporti, EE Bulletins i c orreip andenc e
3210080015 Addl response to FQIA request for 19 categories of info re
nuclear reactor events & lafetg problem* Foruarill document'
lilted in App A Dotumsnts in App B complete lij withheld (rr-f
FQJA fiamption 5J
FELTOH, J M Division of Ruin and fit Cords B2/Q7/1K UDELL. R A
Critical Mass Energy Pr-ajsct 9pp tStAS 027 34X
Fiche 50-000.93/07/13,9210060013
--B2100BO159 Systematic aisessmint of licensee performance nates re
facility evaluation for Sept 1979-Aug 19QO
< riRC - Ma Detailed Affiliation Olven BO/09/31 Bpp
156B &43 24X Fiche 30-000, B2/O7/I2, BSIOOBQOig
map on 320901-27
82/10/O4 Ip 15763
821O2S0469 Wotice of violation Iron
* Region li Office of Director
Fiche 30-272. B2/10/06. S9103104&4
6210210477 IE I n sp Repts 50-372/B3-25 t. 30-31 1 /B3-24
Noncomp 1 i*nc noted trip breakers closed Vila two operable
IDUrce rang* instruments in ivc * Failure to submit 30-di^
LER
NCRftHOLH.L J , SUMMERS, R , TRIPP.l E Division of Project *
resident Programs S2/1O/04 I5pp 15763 021 24 X
Fithe 90-272, BS/lO/Ofip B3103I04i4
321 0270 13i> License Change Requests B2-17-EO~ai & 32 to Lice
k DPR-73 Chang*i involve intervice insp of snubfi ei-s. ittaiT
generator insp portsr conia inment ventilation valve insp
furve 1 1 1 anc e funi-tional testins
LltVDEr^E A Public Service Electric & Gai Co of Nrw Jir
B2/IO/O7 VAROA. S A Operating Reactors Branch I 3pP
24X Fiche 50-273.63/10/07,8210370136
92I027OI42 Proposed Tech Spec changes re in service insp of
installation of iteam senorator insp port s. pros sure drop
teit >i reactor trip instrumentation
' Public Service Electric & Gal Co of Ntai Jeriiv
Bpp 15BS7 039 24X Ficho SO-272. 82/10/07. aS10370l3f>
821OD70007 Reipondi. to FOIA request For ei-ght tategorisi of records
itean genaratoTS (. it earn burbinx App A doEUments provided
in R Udell FOIrt Request 01-313 Foruiardi dotuments lilted iti
tiff
FELTOH. J H Division of Rutei and Hecords H3/OB/IO LONO, D J
Uinthrop, Stimion, Putnam li Roberts 9pp 15i45 Q63 24X
Flchs SO-000, aa/Oa/IO. 021 0070007
a20B19023B IE Bulletin 92-03, "Stress Corrosion CratHnj in IhuH
Wfl 1 1 1 Lflrgi-Dtamiteri 9ta inlesi Steel'ftecirculAtion Si;i
Piping at BWR Plants " Svc list end
DEYOUNO.R C Director's Officr, Office of Inspection and
Eeif arcement 63/10/14 Consolidated Edison Co of Neu Varfc
IIBjip 15B10 123 24X Fich* 50-000. S3/IO/ 14, QSQB1W23B
S310070E3? Porwardi tabulated data on it Bam generator Imp ti maint at
facilities Da til should be provided to licensees
JfpULITO.T Ppsratlng Reactors Asiessment Branch GS/04/01
VARflA, S Operating Reactors Branch 1, 5pa 13649 131 24X
Fiche 50-000, S2/OB/10, B210O70007
B21O28G22I EN- B 2- 03 4 on 021027, notice of violation t propaxd
impoiitinn at civil penalty in amount of *10, OOO issued re
inadequate vital physical area barrier
nrjSAKCMl , AXELRAD.J Director's Office, Office of Inipitlun
Enforcement &2/10/33 Ip 1 5B37 OB9 34X Fiche 50- 372. 621 [ -l
821O2B-C-221
92L012032S Raspondt to violation! noted in IE Insp Repti 30-273/82-17
& SO-3M/B2-I7 on 820707-OB03 Corrottlve attioni
admin Is trativt nroceilure will b* reviled IP future
temporary design changes art removed on fcifflelg basis
UDERITZ.R A Public Sirvjce Electrit tc Qt Co of Hew Jersey
92/09/aa HAYN3,R C Heoion 1> Office of Director STABaBTECnl .
Division of Project !c Resident Program Spp 1SA5S 123. 34 X
Flche 50-^72, e2/0?/aB,B2lOI2033B
operating reports t< related correspondence
B31O2000B5 Forward) monthly operating rept for Sept 11B3
KIDURA.If J Public Service Electric % Oas Co of Meu Jtrti'f
62/1O/IO Director's Office, Office of Inipectlon and Efil
Ip 13757 201 24K Fiche 80-372.02/10/10,3310200083
8210310146 Fcriuardi 1C Insp Rpt 50-372/62-33 on B20B31 ! 0901-03 Mo
noncoinpl i*nca no-ted
(IflaTIN.T r Diviiion it Engineering fc Technical Programs, 92/10/09
UDERITZ.R A Public Service Electric A Dai Co of Nsu Jtrtty 2po
15766 0<?2 Z4X Flcne 30-272, B2/lft/O5. 62I021O146
8210200090 Monthly operating rept for Sop I 1982
HfLLERrL K Public 9ervic* Electric t- Oa s Co of New Jinty
92/10/10 14pp 15787 203 24X Fiche 50-272, 03f-IO/lQ. KltS
S Reportable occurrencesi LEftt t> related cor respondtnca
6210310162 IE Imp flept SO-273/B3-23 on 830B35 t, 09OI-O3 Ho
noneomp I i nce noted Major areas inspected instrvlce tilting
lurvell lance program for pumps & valvts & containment
penetration leakage testing surveillance
REKlTdfW A , BETTEHHAUSEN, L Civilian of Engineering ! Technical
Programs aa/07/29 5pp 1S74A 091 aK Fiehr 30-272,83/10/05,
6210210144
8-21012:034*' Discusses cansisteni failure of solenoid valvei ir
cont*inmtnt fan call unit svc uater flow control valve
LIceniae inve itijat ion determinid that ovsrhoated valves
cauied sticking Valves raplaceif
CHIRAMAUH Director's Office 80/09/12 Director's Cff
tSnb?0 I9O 24X Fiche 50-273. BQ/O9/12, 631012036?
9208190233 IE Info Notice 80-39, Suppl 1. "Leaking h Dislodged 1-135
Implant Sterfi " Bvc lilt end
CDBB.t I Division of Futl F*cUitUi, Materiali & Safegirirtf)
02/10/06 Cantollifjted Edison Co aP Neu Vork 46pp. 13741 250
24X Fiche: 30-000* 82/10/06,97081 90333
B21O01000B Respondi to FOIA request for 19 categories ot
nuclear reactor event* & safety problem Forufrds gfocif
lUtitf in App A
FELTON. J.M Division of Rules and Records 02/06/20
Critical Mas* Energy Project ISpp 15727 OOS 24*
Fiche 30-000, 83/06/29, 92IOOIOOOB
a a 102 10-135 Foruard* IE Insp Reptl 90-27S/92-B0 tc 50-311/88-20 on
320816-20 No noneomp I Unc* noted
MARTINET T Division of EnalneerJng 1< Technical Programs. BH/10/Oi
UOERITZiR A Public &*rvic* Electric b Oai Co, of Ntu Jiney, Spp
15763-036 34K Fiche &0-272.B2/IO/QA, 9210210435
~gai02l04&l IE lnp Repts 50-273/82-20 ft 30-31 1/62-30 on SS0916-20 Mo
noncompllance nated. Hijor areis Iniptctid: qualification &
training, radic-lofllcal survus, rWtaUan exposure permits,
posting, 1 Icanset audit] tc aiposure control
HOSEy.C.M . ROWErC.A,, OHEENMAN, E, Division of Engineering t
Technical Programs B2/09/30. Sop 19763:039, 24 K
FIchB- SO-a7S, B2/ 10/06. 82 1021 043 S,
320213023& Notifiei thet inadvertent; isolation of contalntent 14'
coolers sys du* to radiation alarms is not llkelg LER re ivf
water itolatlon valve) found closed to containment ^an coil
units does not merit further consideration
L ANN I MO, H Director'* Office 62/01/21, HICHGLSON,C DLl|t1?<
Office, Spp 19732257 24X Fi che 50-000, 92/06/55, e2100l(K>M
82100B0019 Addl response to FOIA request for 19 cteoorii at inft"
nuclear reactor event* & safety problems Foruiirdi dacumenti
lifted in App A Documents in App B completely withheld Cref
FDIA Eilmption 9)
FELTON, J H Division of Rule) and Records 92/O7/12, UDELL.lr
Critical Mais Energy Project 9pp 136A9 027 24X
Fiihe' 30-000, 92/O7/12,92100e0013
0210080197 NRC operations ctr uiage chart TB events at facLllliM
* NRC - No Dtailed Affiliation Oiven 92/07/12. Ip ISMS'
24X FIrhe- SO-000. 93/07/12, 031009001B.
DOCKETED ITEMS
75
&ZIM10ISL Foruards LER S2-067/03L-Q Detailed event analusil encl
Puftlic Service Electric t Gas Co of Neu Jersey
HAVNE5.R C Regicn I. Office of Director 3pp
1554.7 3Q2 24* Fiche 50-272, 02/09/16. S21OQ 101B1
821015O11I Foruards LER ai-OI9/03X-l Detailed event analgsis encl
MIBURAiH J Public Service Electric It QBE Co of Neiu Jer*eg
82/09/39 HAVNES, R C .Region I. Office of Director 3pp
156.97 070 34X Fithe 50-272,82/07/29,8310150111
--G21G01OI92 LER 82-069/03L-0 on B2QS31,svc water leak discovered on
charging pump IS lube oil cooler outlet piping b pump
declared inoperable Caused by erosion of piping bij s 1 1 1-
laden svc uater Pipe replaced
IfELLER, R Public Service Electric I> Oils Co of New Jerseg
e2/Oi"/!6 Region 1. Office nf Director Ip 15367 303 24X
Fieh* 50-272,a3/09/l6,82!OOl01Sl
-B2KH5Q121 LER ai-019/O3X~l on BIQ22.li Fire alarm annunciation on Panel
1R-P5 for uiaite oas corop resor observed but no aurfible alarm
heard Cauied by failure of amplifier to discriminate igi
nms from announcement function Amplifier adjuited
HELLER i R Public Service Electric & Oas Co of Mui Jerseg
S2/O9/29 Region 1. Office of Director In 15697073 24X
Flcho 50-272.ea/Q9/29,H210100Ml
2-100103-33 Foruards LER SI-D6B/03L-0 Detailed event analysis encl
KIDUflA.H J Public Service Electric & Gas Co of New Jersey
G2/O9/16 HAYfJES.fl C Region 1. Office of Director 3pp
I559 113 24X Fiche 50-372,02/07/16,8210010383
B2101S01E7 Forwards LER B2-067/Q3L-Q Detailed event analysis encl
MfDl/RA.H J Public Service Electric & Qa-s Co of New Jersey
B2/09/29 HAYNES. R C Region 1. Office of Director 3pp.
15693 324 24X Ftche 30-372. B2/O9/29. B2I01 30137
210010390 LEfl 62-O6B/03L-O on 920827, 100-f t elevation containment
lock declared inoperable after eicesswe leakage discovered
pail; inner door seals Caused by closing door y/eicesslve
force Seal replaced Installation of snubbers proposed
HeLLER.ff public Service Electric t- Gas Co of New Jersey
O2/C9/16 Region 1. Office of Diiectnr Ip 19969 196 24X
Fiche SO-2 - '2.92/O9/16,e21Q01O3B3
821015Q140 LER a2-O67/03L-O on S2O9-13,,no indication of ivc water flow
to containment fan coil unit El noted while coll unit 14
Inoperable Can tad by terminal acreui cm svc water Plow
transmitter dreading off Screw replaced
FRAHM, R Public Service Electric & Oas Co of Nfliu Jersey
82/09/39 Region I. Office of Director Ip 15678 337 24X
Ficbo 30-272, B2/0<7/27, S?10I50i27
3310070305 Faruards LER 82-073/03L-O Detailed event analysis encl
MtDURArH J Public Service Electric f, Cas Co of New Jersey
B2/09/22 HfiVNES.H C Region I. Office of Director 3pp
15fr34 1O7 34X Fiche 50-272, 02/09/22, S21OO70305
82101SQ149 Foruards LE|t 82 Q51/03X-1 Detailed evenb analvus en
HIDUflA- H J Public Service' Electric & Oaf -a of ttnia Jpig
62/09/29 HAVNEBi R C Region 1, Office at Director 3pp
15697 EBB 24X Fichu 5O-272. 82/O9/29. BB1 OI 50143
--621C-07O314 LER aa-O73/03L-O on 820906, cal nu 1 ati on showed that quadrant
pouer tilt ratio for oottom detector N42 eiceeded mat
allauable [jmit Caused by failed milllamp detector suitcti in
current meter assemolg Assembly replaced fc channel tested
FflflWM.R Public Service Electric t Gas Co of New Jerseij
B3/O9/22 Region 1, Office of Director Ip 15634 110 24X
FichEr 50-272.62/09/32,5210070305
6210190155 LER B2-051/O3X-1 on B2072S. f o-l louing redctur tripi level in
auniliary feed itovage tan' dropped b i 1 ou Tech Sp*c rain
Caused bcj binding Of valve 1DR& Valve manually cvcled t> tank
level re>itorac( to normal Valve returnecf to remote modi
HELLER. R Pu&lic Service Electric & Oas Co of New Jeng
B2/O9/27 Region 1. Office of Director Ip 13697 391 34X
Ficha 50-273, SS/O9/27. 6210150143
I3LOO7036B Forwards LER S2-Q74/04L-0 Detailed event analvsis encl
MEDUflrt,!! J Public Service Electric t Gas Co of New Jersey
B2/0-7/22 HVWNES.R C Region i. Office of Director 3pp
13634 031 24X Fiche 50-27?. B2/09/33, 8210070368
B21021O134 Foriuarrfs LEU B2-07Q/03U-0 Detailed event analgtis end
M I DURA i H J Public Service Electric 4 Gas Co of Nu Jeng
B2/10/O6 HAYNES.R C Region t. Office of Director 3pp
15764. 120 24X FichB 90-273, B2/ 10/06. B2102 1 0134
-B210Q7Q37S LER H2-07fl/04L-0 on 620903, ind ication of unplanned release
t^^^JU^h plant vent received Three individuals contaminated
during attempts to locate source Caused bg door hitting
a j.i-1-nit drain valve 1CV332. cauEing valve to loosen & open
HOLLER ;R Public Service Electric b Gas Co of Neu Jersey
03/09/22 Region I. Office of Director Ip 15634 034 24X
Fiche 50-272.83/09/22.8210070368
--621O21Q144 LER 82-070/03L-0 on 620912 & 14, presiui-Jier pre*ura
controller shifted to manual modte ui/d*creflainB pi'enure
Cauie-d bg intermittent arable in pra-llure controller or
injinw*I-aki6o station Manual-auto ttation replaced
FRAHM, R, Public Service Electric tt Oa> Co of New Jrstg
92/1O/06 Region li Dffit* of Director Ip, 18766 103 24X
Flch, 30-272, B2/1O/06. B21O210I34
2IOO70330 Furuards LER B2-071/04L-0 Detailed ovent analysis encl
MIDURAyM J Public Service Electric i Oas Co of Neu Jersey
S3/09/22 HAYNEB.R C Region 1, Office of Director 3pp
15633 35fc 24* Fiche 30-272. 02/09/22- B2100703BO
B210290216 Forwards corrected LER S2-O1 6/04L-0 Detdlled event j
enc 1
MIDURAj H J Public Service El tc trie k Oas Co of Neu Jersey
B2/IO/O6 HAVNESjfl C /leoion li affice of Director. 3pp
15953-350 24X Fiche 50-27S, 82/ 1 0/O6, BaiOa9O21t
LER S2-071/Q4L-0 on 620827. contr ol operator discovered
increasing level on Plant vent radioactivity monitor b
issuerf significant event notifications far unplanned
release-! Caused by primary coolant leakage from RGB filter
FRAIIll, R Public Service Electric & Oas Co of Neiu Jersig
62/09/32 Region 1. Office of Director Ip 15433 339 H4X
Fiche 50-272,62/09/22,8210070380
B21O29021B Corrected LEfl B2-016/04L-0 on 820336, during gaseous release
from uaste ja> mij i, tontainiiien t/plan t vent monitors IRllAi
1R12A li 1R12B incorrectly Aligned Cauied by operator failure
to properly perform operating instruction,
FRAHM,R Public Service Electric . Oa Co of Neui Jersey
82/04/13 Region 1. Office of Director Ip, 1S853 253 S4X
Fiehe 30-272, B2/lO/Oii 8210290216
2IO15CQSO Foruardi LER 82-066/O3X-1 Detailed event analysis encl
MIDI^R/l. H J Public Service Electric & Oas Co of Neiu Jerieg
B2/O9/29 HAVNES.R C Region 1. Office of Director 3pp
156-78 296 24X Fiche 50-272, B2/09/27, 82101 30058
-6210150066 LER 82-066/03X-1 on 820B25, 100 ft elevation containment air
lock outer door discovered not properly sealed Cauied bg
seal damage due to personnel closing door u/eicess i vt force
Seal replaced & door tested sat isfac tori 1 g
HELLBfliR Public Service Electric k Oas Co of Neu Jerseij
82/09/29 Region 1, Office of Director Ip 15698 299 21X
Fiche 50-272.82/09/29,6210150058
>1 01 50071 Farwardi LER 82-044/03*-! Detailed evvnt analysis encl
HIDLJfTA. H J Public Service Electric & Oai Co of Neu Jersey.
32/09/29 HANYES.R C Region 1, Office Of Director 3pp
15701 243 24X Fiche 50-272, BK/O9/29, 82101 30071
82IO1SOO7S LER B2-044/03X-I on 820623, dur ino routine operation, vital
ventilation control ctr 1C tripped, render ing control room
emergency air conditioning fan 12 inopirab le. Caused by
setpotnt drift & breaker 1CI6Y trip Breaker replaced
H&LLEH. F public Service Electric t Oas Co of Neu Jersey
62/09/29 Region 1. Office of Director Ip 1S701 B4fi S4X
FCcNe 50-272, B2/09/29, 8210150071
82IOE9031O Foruards corrected LER B2-OSO/Q4L-0 Detalleit event analysis
end
MIDUHA>H J Public arvlce Electric t Oai Co at Neu Jersey
92/1O/06 HAVNE8, R C Reflion 1. Office of Director 3pp,
15B93'O90 24X Fiche 50-27E, 82/1O/O6, 8210390310.
-B21O290314 Corrected LER B2-030VQ4L-0 on 820710, At 1 antic loggerhead
tur>tl found imp ing id on circulating water itfs intatt trath
b*r* Cauied by Inability of turtle to actively avoid
approach velocities to intake dire to weakened state
FRAHM^R Puolic Service Electric: i <9a CP. of Ncu Jersey,
32/08/06 Region 1< Office of Director Ip. 13853.093, 24X
Ficht 30-372. 82/10/06, 621Q39031Q
0210890333 Foruiards corrected LER BS-049/Oqt-O Detailed evnt analysis
encl
MIDURAi H J Public Service Electric tr 0i Co of Meu Jurug,
&B/IO/Oi, NAVNEai R C Rejion 1. Office of Director 3pp
1SBS3 014 24X Ficfie 50-273. 82/1O/OA, aai02<?O353
B21029Q361 LER B2-Q15/Q4L-Q on B20710ruat. monitor tank content*
*ample diicarded before corapocite- lanples asienbled Cauied
bg technician inadvertently pouring out sample. Personnel
covn*ltd re pTocmJuret Simulated **mple made,
FRAHM.R. Public Snrvlee EKctric & 9> Co. of Una Jerieg
63/07/28 Region 1' Office of Director. Ip. 1SB53 017. B4X
Fith* SO-27 S,BS/ 1 0/06 f 8210290333
76
DOCKETED ITEMS
DOCKET 90-273 DIABtO CANYON NUCLEAR PDHER PLANT, UNIT 1
A Apjl ieat ion/con-itruction taga document* k eornipcndince
..__ .___,,__, ...___,.,..,__ .-_-_- -^-, ._______--,._._ __.____. __-
82100IOQOB fleipond* to FOIA rea.ueit for 11 categoritt of document! r>
nuclear reeetoc- evtnte & lafety problemi. Forward* documenti
U*teif In Ayfi A
FELTOM.J Diviiion of Rule* and Recordl SS/Ob/28 UDEUL.H A
Critical H*ii Enrgv Project ISpp 1B727 009. 24X
FlcAt SO-000. S2/06/28. S2I0010QOB
BQ00Q90269 Dlicuiiei addl renulreif Inlo to bitter define potential for
cricking in reactor vatlel noilln
NOOTAH, V ff AnHtant Director for H*tirllt Ic Oualif icationi
Enfinirlng BO/05/QS TGDEBCfl.R L Aiilitant Dirictor tor
Llctniing 2pf 13727 176 B4X Fichu' 50-000, 83/OA/2B, 021 001000B
F Security.! medlealr emarjencu. b fir* protection plans
9210010406 Forward I applieitlon for emend to Llcanie DPR-7bi rivif ing
Kturltg plan
CFANE.P.A Pacific Oai (. Electric Co BB/09/17 DENTOM.H R
Office t>1 Nuclear Reactor Regulations Director lp. 19972.207, 24X
Fleh, 30-279., 02/09/17,521001040*.
--B210<0104I3 Application to amend Lieenit DPR-7A, rtviil nj tteuritu plin
B4f*]ueri(i info ftiittt.
HAMEATJB-0 A., CRANE, P, A Pacific On b Elictrlc Co B2/07/17
3j>p ]SH72:aOa, S4X fieh. 30-270, 82/09/17,B21001040i,
8210030219 Riply to applicant & NRC 820924 briefs r* lUtui af pf
apptalf froin authoriiation of loui power opr*tion Ha
adtqiJ.lt* factual bull *il*ti to support ASLD diimiml al
Joint Inttrvtnor OA conttntion ai moot M/Certif icatc of Bvc
REYNOLDS, J fl Joint Intrvinopi-Diab lo Canyon REWDLDS. J R
Cintvr For Lau in the Public Interest SS/09/3O Atonic *f
and Llcvnilng Appfll Pand Spp 15611 337 34 X
FUn* 50-279,62/09/30,8210030218
9210060220 Reply brttf to other party briifi r> noDtnift ot low |
cantentlDn-i Emgrgincij planning inuet d certain other
ifiuei moot Cartificata of Svc end
LOCKE, R F Pacific Oai t Electric Co 82/07/30 Atomic Si'
and L iteming Appeal P*nel ipp 13630 170 24X
Fieht 30-H7S, S2/09/30,B210060220
B2100'1D097 Reply to Oovsrnor Droun t< Joint Intervenon B3Q13H til
in niponie to A8LB B20902 order on mootnan of I am pcuier
iiiuo Emergency planning inuei (< lome loui pouiir
contention* mooted Certificate of Bvc encl
JONES. B W, Hairing Dranch 1 B2/10/01 Atomic Safety *nd
Liceniing Appeal Panel Iff 133BI 02A 24X Fich SO-SJi'Bit
82 100 40097
6210050190 Replij brief to util b NRC S20724 brief* r* irootnm ai
power lnuei'pir ABLE BE0902 order IIIUBI not moat
Controvar-ig ttlll eiiiti !< inue ii of practical
llgnlMcance Cirtiflcate of Svc encl
DRDWHiH H California- State of BROWN, H H Klrkpatr iet. Lttt
Hill' Chriitophir (. Philllpi 82/10/01 Atonic Bifit^ mf
Llcinilng Appeal Panel Bpp 19403 343 24X Fiche SQ-37S,63>
BS100501BO
QBI0210033 neliatei public veriloti af ravlieif effltrjeneij plin
imp lemin ting proeid'urii,
FtLTOH. J,M, Dlvliion ot Rurlti anil Racordi S2/10/OJ Document
Hifllmint Dranch if. 18762; 091 S-IX Fl ch*:50-279, 02/10/01,
0S 1021 0033,
'0210210011 Forward* public vtnlon- of rivited emrgtncv pl*n
inpliDiindng ppottdurtii Including Procedure Ep M-3 re
clilorlni r*U4tiEP M-B r* Tiunini uarnlng i EP M-G rr
conSalnmirtt tintrjencij ptrtonnel h*6eh,
CflANB,P,^, Pael'le Oti t electric Co. B2/09/23, eHOILKEN.fl H
nig ion B< aNict of Dlrtctar. 3pp, 19738:093, S-tX
FUhe. 60-378, Ba/l<V01, 3310310033
8210040196 fiiqueit for laive to ulthdraui certain exceptiani to AH
620831 initial ifecllion rtSLD B20927 clarification of i lcal
juriid'ict ion acquieicance to precondi t ioni re BOPi render
Keep tlont unnecemrij Ctrtlficate of Bvc ancl
HASSELL, D r Hearing Branch 1 82/10/04 Atomic Qttttv r.i
Lictnilng Appeal Panel 3pp 13413 173 24 X Flcha SO-B75. B2.
02 10040 1 E6
9210070143 Order ettanding time until B2100B for Coirml
reviiu ALAff-ifll
CHILK, B, J, Office of the Scrttry of the Commiiilon
Commlnloneri. lp 15627076 24 X FIche 30-273, SS/JO/03,
BS10070M5,
Public vertlcn of pevlitd initrgfncii plin Implementing
ii, Including Procidun P H-3 r chlorine reltnii
E? H-9 re Tiuniinl umrnlng Ii EP K-S re contilnntnt
I, Glictrle Co. D9/09/1-3. 64pp. 197821099. S4X
Birppl to EtS071<r ipplUjtlon far *flind ts Lie in it DPR -76 re
4**i/l-tty plan. End witliniU (ref 10CFR73, Sit.
CfUNI-P.A, PaciflB Oil b Ilieitic Co, 2/10/19, DEMTQN.H.R.i
M Ifl (SOU I A OMiei of Ht/elitr Rfattcr Rigul*tleni Ofricior. Bpp.
16X031 97V, S4X Plehe: 80-870, aa/iCVIB, BS
eorpuperdinet
n up on iff ta B30S1S pitltlan nqutitlng action under
(OCfflfl. B06, For riiion* lasted In *r>eleiid Dlrietar'i
j ebltlgn iinUd,
rh, orfltf af Mifelur flurtor Jtigulitiani Dlpietar.
, fllVNOi-DIr J. Cifllir far Lay in thi Pirtlic ln,tiri*t.
ISB43i 164, B4X Plehit: SO-B79* flS/Qf/SB, 18(039044*,
DlrietBr'i fiieiilar DD-DB-10 dmulng otp for Liu in Public
I3091B Hatitlon Mounting MC lnui ordir (a util
la *utffli* mind ta OL ta covir HA t 00 liiun.
. O'flei at Nutlef flueter Rraulillam Dlrfcter.
?ep, IBQiai E7I, 94X Flehu 90-9
8210130272 Fo-riiiardt Bin Lull ObUpo County Doird of Suptrvitor i E
action approving Bin Lull Obltpo County nuclear pouer plent
nurgencv reiponit plan It State of CA Senate Dill 1473
minding govt code. Certificate of Svc end
CRANiP,A Pacific Oat t. Elictrlc Co. SE/10/Oi JIUCiW II -
JDHfJBONrW, R . MOORE, T 5 Atomic Safety and Uceniin* tlfnl Pi
ipp. 19673.284, S4X Flche 80-275-92/10/06,0210130278
8210130332 Order CLI-B2-30 directing all natl fecurltu cUiil
be eJtpungerf from ALAD-&93 Ii underlying record Info not
iltintlel to ABLAB opinion b eipunctlon would not prt|u(lc+
my party or public
CHILKiS.J. Office of the Secretary of the Committing
2pp, 18492:108. 24X FUht 90-279,02/10/00,8210120332
6210130327 Order eitendlng timi until 821026 for Commit tint to 11
rivleu AUAB-tBl.
CHRK, fl, J, Office of the Becretary of the Commtiiic-n, B3/IC-/I
Comnltlioniflrfl. lp. 19678; 282, 24X Flche' 50-278,62/10/00,
S210130327.
8310310428 Order eitandlng tine until B21103 for Cosimllilon t*
rivliu NflR Director 62092! denial of Joint Intirvunon
lOOFftS. 806 requnt.
CH1LK. B. J, Office of the Secretary of the Convnltil^n
Cflflxmtllionirt. lp. 18743' Ofl3 2-4 X Flche: 90-279.62/14/19
SS 102 10432.
"8910890484 He tie* of lnuinii t DIrictor't Diclilen DD-BS-IO under
lOSPfla.aOft dtnuing pitiltlin feu Ctr tor Liu In Public
Inliriit cftuiil la rtquin will (a tubnlt tntni ta OL be
eavir 8A It 40 tnuii,
MNTeKiH.R, OMit ^ Nuiltir flueter Rigulitianf CJrteber,
BB/09/BB. 9pp, lBSi l?fl t B4X Fichu BO-871. 18/09/881
1210200849 Kimcrandum In reiponie to util S20924 motion far
cUrlfltAblon of ASLB 820931 initial dtcldon, Dec Iilon
lupporti coneluilon of Uu on adequacu of offiit* tnir|iMv
pUnning.
WOLF. J.F. Atomic- Bifetij and Llcenilng Board Panel B2/IO/2A
18937^086, S4X Flchl, 80-275, B2/10/26, S2102SOS45.
lBiaa40iee Brdir utindlng tlni until BRIMS *r 0*Uiin ** nfc to
ftvltw AUAB-ABL
flKJLKifl.J, Of'Ki at th* flitrttii-y of thi CiMfiilan,
SafflfllillUniri, lp, UHlfMB. B4K FiBhll BO-B79, 88/09/30,
aa ioo4 01 01.
H, Sinepil eorr eipendenei
6310020369 Advliti th*t B21010 Hr nqueitlng util r
laftbu iV* *t planti ullt tie tint to all partlil
OILIH8KV- V, Commlillontri, S2/iO/flO, SCHULK,B,
Unknown. lp. 10779:201, 24 K Fieht: 80-279, 02/10/30. 8210fflJi:
DOCKETED ITEMS
77
--321:0530367 Urges util be forced to recalculate entire seismic safety
iiji at plan t
SCHULKE.S Affiliation Unknown
Coirms*i(meT lp 15779 302
B210220363
82/10/10 GILINSKY, V
24X Fiche 50-275,82/10/20.
8310120284 "Blume Internal Review Independent Internal Review of Work
Dana by URS/Blume Engineers on Diablo Canyon Nuclear Power
Plant, " final rept
* UR8 Carp URS/JAB 02 it 33/09/30 SOpp 13654 117 24 X
Fiche 50-275.92/10X01.0210120278
Operating license stage tic
jpondenci
E21QOB0350 Informs that procedure, me lud ing proposed "Statement re
Potential of Apparent Conflicts of Interest'" meets
requirements for independence Requests procedure be included
in program mg t plan; for Phase I & Phase II
DEN TOM, H Ft Office nf Nuclear Reactor Regulation, Director
B2/O9/OS COOPER, ME Teledyne Engineering Services ip
6 31X Fiche 50-275,92/09/06,0210090330
application for amend to Lien
sec ur i tij plan
CRANE, P A Pacific Gas t. Electric Cc
Cffite of Nuc]c.ar Reactor Regulation,
Fich 50-275, B2/09/17.S2IOQ10406
92/09/17
Director lp
DPR-76, rev i Sinn
DENTON. H R
6210O10fll3 Application to amend License DPR-76, revi s ing security plan
Safeguards info deleted
rTArJFATIS. Q ft , CflANE. P A Pacific flas J. Electric Co B2/O7/17
Jpp 15572 2OB 24X Fiche 50-275,92/09/17.9210010406
S3LOO4D42V In fin-rat of decision to partially refund fees remitted u/
BOCS21 application to eitend latest CP completion dates
MtLLER.IJ O License Fee Management Branch B2/09/21 FUHDUSH, M H
Pacific Oas S- Electric Co lp 15597 262 34X
Fiche 50-275,92/09/21,9210010429
B210C-80373 Notifies that program procedure for communication from t> to
Independent design verification program will be revised to
conform w/gul del inei provided in 920927 Itr
COOPER, W E Teledyne Enerjy System 82/10/02 DEN TON. H R Office
of Nuclear Reactor Regulation, Director 2pp 13638 124 24X
Fiehe 50-273, 52/10/02,8210030272
9210090076 Forwards interim technical rept "1 ndepondent Design
Verification Program Verification Program for PQ&E
Corrective Action," Revision
DENIEON.E Robert L Cl oud Assoc ia tes, Inc B2/10/05 DENTQN, H R
Office of Nuclear Reactor Reg-ulatlqn. Director ENOELKEM, R H
Region 9, Office of Director MANEATlSiO E Pacific Qas & Electric
Co lp 13MO 277 H4X Fiche 50-278,92/10/05,9210000079
B21OOB0090 "Indtpendant Deilgn Verification Program Verification
Program for P01E Corrective Action." Revision
DENISON.E Robert L Cloud Associates, Inc P 105-4-339-003/100
82/10/05 ilpp 15440 278 24X Fiche 50-279. 02/10/05, 8210QBQQ7B
8210250167 Forwards "Diablo Canyon Nuclear Power Plant Independent
Design Verification Program Program Plan, Re vision 1, Adjunct
Program for Evaluation of Const QA "
COOPER, U E Teledyne Engineering Services B2/10/OS DENTQN, H R
Office of Nuclear Reactor Regulation, Director ENQELKEN, R H
Region 3, Office of Director MANEATIS,G A Pacific OKI t, Electric:
Co 2pp 1S7B7 120 24X Fiche 30-275-92/10/03,9210230167
&3l0130Q5fs Responds to 920737 request for status rept on design
verification program & briefing on proposed Phase II of
program Info discussing background fr current status enc 1
DIRCKS.tl J Office of the Eiecutive Director for Operations
B3/O9/24 PALLADINO.N J . GILINBKV-V , AHErtRNE. J F Commiss loners
2B>p 15692 284 24X Fiche 50-275,92/09/24.8210130056
B21QOI0I49 Provides guidance to assure independence of Telidgne
Eno- ln*ering Svca uM I e recognliing need for communication
betuieTi Teledi|ne & util
DEN TON, H R Office of Nuclear Reactor Regulation, Director
92/O972? COOPED, W E Teledijno Engineering Service* 3pp
15S67 244 24X Fiche 50-375,62/09/29,9310010149
G?IOOB0191 Foruards Revision 2 to Procedure DCNPP-IDVP-PP-005,
"Potential or Apparent Conflicts of Interest of
Individuals " Uord* "engineering mgt" inadvertently omitted
In Sittion 2 O during retyping of Revision 1
COOPER, H E TeledijnB Engineering Services B2/09/29 DENTON. H R
Office of Nuclear Reactor Regulation, Dlroc tor ENCELKEN. R H
Region -5, Office of Director MANEATIS,0 A Pacific Oas & Electric
Co lp 1564O IBS 24X Fiche 50-275,93/09/29,9310080(91
B2IOQB0193 Reviaion 3 to DCNPP- 1DVP-PP-005. "Potential or Apparent
Conflicts of Interest of Individuals "
COOPER, W E Tlerii|nB Engineering Services 02/07/39 5pp
15610 JB3 24X Fiche 50-273,92/09/39,8210090191
821O2S0171 "Diablo Cangon Nuclear Pouer Plant Independent Dnign
Verification Program Program Plan. Revision 1, Adjunct Progr>am
for Evaluation of Const Oft "
Teledyne Engineering Services 82/10/01 12pp 15787 123
24X Fichu 30-279,92/10/03.8210350167
B210230UB Forwards (iH Engalken 820715 memo re RF Reerfgr Inc e>lt
meeting concerning QA audits for consideration in eviration
of OA program
EI9ENHUT.D Division of Licensing 02/10/06 COOPER, U E
Telodvne Engineering Services, 2pp 15009 007 24K
Fiche 50-275,82/10/06.8210250169
B21O250392 Bummarg of 020910 meeting w/util & RF Reedy, Inc rf QA audit
of in-house deBign
EHOELKEN, R H Region S, Office of Director B3/09/1S
DEMTOH, H R Office of Nuclaar Reactor Hegulatlon, Director 3pp
ISBOB'OH S4X Fiche 50-375,82/10/06,9310250168
9310330240 Foruarde Independent design verification program comments on
Phaio I final rept Rept should contain detailed descriptions
of scope, criteria, methodology & modali for all structures,
sifs b components
COOPER, W E T*ldn Engineering 8ervUe 82/10/07 DENTDN, H R
Office of Nuclear Reactor Regulation, Dimeter ENQELKEN- R H
Region 9, Office of Director MANEATIB.O A, Pacific Oa k Electric
Co 16pp 13789 150 24X Fiche 30-279, B2/10/07, 831035024C-
Foruards info addressing Sections 3 1,2 S.Z 3 tc 2 4 of
Generic ttr 81-O7 re NUREG-0612; "Control of Heavy Loads "
Section ? I update! B 10921 submlttal Submit tal addressing
remaining required analyses eipected by end of Feb 1983
CRANE.P A Pacific Oaa 1 Electric Co 82/09/30 MIRAGLIA.F J
Licensing Branch 3 176pp 15605 312 24X Ficha 30-375,83/09/30,
B2IOOS0122
621005O14-1 Responds to Oeneric Ltr B3-12 re plant staff working hours
Util administrative procedures address revised working
hours
CRANE,P A Pacific Gas J, Electric Co 93/10/01 MIRAOLIA, F J
Licenaina Branch 3 lp 15605 161 34X Fiche 30-373,92/10/01,
0210050144
8210030123 Notifies of B21007 meeting w/utll in Ban Franc iico,CA
to discuss status of fhasn I & II, instrument tot rtj for
verification of corrective action b WRC 820919 Itr r fuel
load.
* T*ledyne En*rgg Systems B3/10/OB Tcledyne Energy 9ystmn*
lp 19640 137 24X FUh. 50-273, B2/ 10/08, 92100B0133
8210290446 Staff requirements mnmo re BE 1007 af f irmation/discus non !i
vote on Btnilon of conit completion dates for UPPB8:
purging af claisifled mitl In ALAB-653 if vmergency
preparednesi It risks assoclatid u/fuel loading,
CHILK, B J Office of th Secretary af the Commlttslon, BH/IO/OH
Office af the Secretary of the Commission 3pp. 13063, IBB, 34X
Fiche- 30-000, 83/10/08, B3 1 0290446
B21013027B forward* "Design Verification-Phase I," final rept t "Dluitm
Internal flevieu <BIR) Independent Internal Reviews of Work
Done bu, LfiS/Blum Engineers on Diablo Canyon Nuclear Power
Plane "
CF)ANE,P A Pacific Oas (. Electric Co 82/IO/01 EI8ENHUT, D,
Division of Licensing 2pp 1 5653 243 4X Fiche 50-275,93/10/01,
S71OI20273
931OIH03B3 "Dosign Verification - Phase 1, Final Rept "
n Pacific Oas i. Electric Co T100S743 R03 82/10/01
13653 245 24X Fiche 30-275,83/10/01,9310120378
233pp
B210190470 Provide* info r oumershlp of Cechtel Power Corp
FRIEND, H B Bichtel Corp 83/10/11 MIRAQLIA.F J Licensing
Branch 3 lp 13740 181 24X Flch* 50-375,82/10/11,9310190470,
9310270331 Advls** that Bechtel Pouer Carp i entity responsible for
work on project Qiunerihip. held bg officers of Bechtel
Oraupr Inc ,
FRIEND, H B Pacific Da* & ei.ctric Co FRIEND.H.B. Bechtel Cnrp
92/10/11 MIRAOLIA. F. J, Licensing Branch 3 lp 1SB34'339, 34 X
Fiche 90-373,82/10/11,9310370391
9310150389 8upp) to 830719 application for amend to Lleens* DP41-7A re
securltu plan ncl withheld (ref 10CFR73 31)
CRANE, P. A Pacific OBI & Electric CD 93/10/12 DENTON, H R ,
MIRAQLIA Office af Nuclear Reactor Regulation, Director, 2pp.
19703 277 24X Fiche 30-275,02/10/12,9210130309
78
DOCKETED ITEMS
8310330271 Clarifiei 921007 statement rr required ttji, i tructur* s &
component! for plant operating modes for indepindent design
verification program
COOPER, WE Teltdijna Eooineering Servicn 82/10/12 EISENHUT.O
Division of Lie truing 4pp 15790 191 24X Fiche 50-275,33/10/13,
B21O2SOS91
B21Q290Q97 Requesti eip lanatlon of protest & chronology df a.v*nis in
uiJlich TlBdu.ne discussed contt (bA review of plant ui/util.
Dichtel & SJ.W Info required to determine presence of
conflict at interest Met-tins requested
HfiOHW. H H Kirlpatvicl, Loclfijrt, Hill, Chr iitopher 4. Ph i 1 1 i pis
IfltHJN. H H California, State of B3/1Q712 COOPER, W E Tlei!nnB
Enslnserins Service* 2ap 19953 361 24X Fiche 50-278,02/10/13,
8g 10290097
Inspection reports, IE Bulletins t correspondence
9210070007 FleiDotidi to FQIA renuest for tight categories of r, co r^i
<taam generator* * iteam turbines App A documentt provided
in R Udell FOlft Request Bl-313 Forward* documents Hited in.
App B
FEUTON, J M Division of Rules and Records 82/OB/lO I fflio J
Hi n thro p, Etlmnjn, Putnam & Roberts 9pp 15645 0^3 3**.
Fiche 50-OOO. B2/OB/IO, 8210070007
--B2 10070 131 Forwards tabulated data on steam gennratnr intp 1 rjji
f*.ciliti* Dat* should be provided to licensee*
IPPDLlTDiT Operating Reactors Aiieslment Drarich (la/01/01
VAROA, S Operating Reactor* Branch I Spp 1 5643 t;i| III
Flch* 50-000,92/06/10.8210070007
8=10290214 PT-ovidn NFtC recocnnund ation re Phaia II of indvpind ent
dtiign virFlcitlon program Phase II p raj ram plan &
rti{uirmt-nt that Piiail El revi tuJ/evaluation t be completed
prior to fuHi load/lou pourr dt-cition approved
DIHCKSi W J, Office of the icutiv Director for Operation!
SECV-B2-4t4 92/10/13 61pp 15076 3&1 24X Ftihe 50-K73,
93/10/13, BS 10 2702 14
62101905-03 Adviiei that tiiio former Dchtl *mploij(i*i uill be retained
an Independent deiign verification program rndividualn dp
not violate procedure on conflict of inter* *t E> mill not
vert'^ war I p artlc tpabad in it Bechtel emplagu
COOPER, W E, TeleifHjnB Erirj I ncpri ng ServleBi 83/10/14 DENTOW, H n
Qfflce nf Nuclear Rtactor Rigjlatlon, Director ENOEt-KEM, H H
Region 3, Office of Director MANEATIS.O A Pacific On t Electric
Co, 3pp 1S791 184 24X Fiche 30-275. BE/ 10/H. 8310190533
&aiOI*P05a4 Provide* preliminary reiponn to fl 20701 raqueit for re-vieu
op seven pointi re validity oF BNL rsiults Si gnaric
impllcatiDni in -fiml rapt dancernlng analijiii of facility
COOPER, H E Telidijna Emgineerlna Services 8S/10/19 DENTON. H R
Office of tJ-uc tear Reactor Regulation, Director 3pp 15791 137
24X Fich* 5O-a7S.B3/10/15,B2l0190584
9210220371 Forward i addl lectioni for Phan I final re,pt r design
verification program per coimiitnent made In 620B20 Itr,
Rnvition A to outline Phase 1 final ript tc reviiian to
lectiani prevloutlu submitted
CRAKE.P A Pacific Oai t ElectT-ic Co 82/10/19 EIBENHUT.D
Dlvlifon of Lictnting tOIpp 13779 333 24X Fiche , 50-275.
82/10/15,6210220371
8210290210 Identified concarnt riiulting from revieu of URB/Glume
containment annulu* itructure model ivaluation Conctrni
i<ultd in iiiuance of ED! FU*i 3006 tt 3007
HRAV, R Tffledgne Engineering Services 98/10/19 MAMEATIS, A
Pacific Ojt a l*ctrU Ga 4pp 13783 293. 34 K
Flehe- 50-375, BS/10X1S, 3210350210
92I02S0316 Gammnti on Region 5 H 209 13 memo re Phaie II of in riff per Bent
dicign vii-if icition projram.pir BEIOOi refueit Change In
Ph> II not Indicated
COPPER. H E Teledyno Engineering Service* 8a/lO/I9 E1BCMHUT. D Q
Division of Licencing 3pp 15790 04B S4X Fiche SO-275. B2/IO/I9,
G2102S0319,
B2102BOB72 Not! Clis of planned 921 loi moating u/plant perconnel to
audit togiitic: plJinnlnj for activlti** performed
HEEDV,R F, fl F Rtufgi Inc B2/10/15 COOPER, UE TBledvne
Englneerini Sarvicet 3pp 15B37 292 24X Flcfte 30-373,82/10/13,
Q210SB0273
8210060133 Forward! IE Inap Diptl 50-275/62-26 b 30-yay/Cia-l'J an,
E2072fi'3OiOaii6~2D d OB30-090I Mo noncompl lanes noted
1 SHOP, T W Divliion of Huiidtnt. Reactor Project t. frf trier br
Programs 82/07/17 CRANE- P ft PacifU Oai t aiectrtc Co i
15&14 307. VAX Fiche 50-379,03/09/17,8310060133
8210060141 TE Imp ilepta 50-275/83-26 & 30-323/02-1.) on I!.'OJ
OS16-20 ( OaSO-O'POl No noticompliance noted Major are4l
Jhtpeitrnd sit* tour & mod to piping !< >lettrlc) riciu^v
supparti reiultlng from revised annulus lelimlc ipeclr^
DUnDOJH.J F , ZWETZIO.O 11 Division of Resident, llmctor
Engine* ring Programs B2/09/I7 9pp 15614 31] ,HJ
Fiche SO-275.B2/09/I7,B310060133
9209190233 IE Info Notice 80-35, Suppl 1, "Leak ins t, Ultlad)e4 1-l
Implant Seeds " Svc lilt encl
CODG.U I Division of Fuel Facilities, Material* (, IJaftnujrit
B2/1O/06 Conioliiiatad Edison Co of NBUJ York 6App ISftt
24X Fiche 90-000, 02/10/06, 92081 90233
6203190236 IE Bulletin 83-03. "Stress Con-mi on Cracking Lti IMtl-
Mal 1, Lrge-Di a,meter, Btainleu Steel, Rec ircu lallon iliji
Piping at OWR Plants " Svc list encl
DEYOUNO, R C Director's Dffic, Office of Inipicllon <biid
Enforomtnt 32/10/14 Consolidated Editon CD of Ht\i Vat*
I19pp I59IO 125 24X Ficfte BO-000, B2/10/ 14, BSOB! TOJJD
B21O2B02B7 Foruards IE Inp Hept 50-275/82-29 c-n OaoRJ'C "LOUil Po
noncomp 1 i ante noted
BISHOP i T W Division of Resident* Reactor Project h luginieil*^
Pragrami BZflO/lA CDANEiP A Pacific Oas (. Elutrle Co til
13B39 010 2flX Fich* 90-273.82/10/14.9210280207
S2102B0303 IE {nip Rupt 50-275/B2-29 on B30a29-10(>J No nurci
noted Major arcai inspected plant aperdtl ons. lurvrllltnt t
Seat ing. phi^iital securi tijiinaintr Si TMI task action p\tn
ttami
CARLSON, J D , MENDOMCA.M M , tURSCH, D F Divliian of Utii
Reactor Project fr En]inBerlng Programs B2/IO/1G Spfr
15B3? 014 24X Fiche 50-275,02/10/14,32102(103137
9210330324 Foruard* IE Imp Repts SO-27S/82-30 ti SO :IJ,I/11J -1* **
830914-16 No roncompliance noted
BISHOPiT U Division of Resident. Reactor Projflet 1 ( PH fcni if i"j
Programs 82/10/14 CRANE. P A Pacific Oat t. [ILictrlc C-3 >il
18039,019 K4X Fich 30-275, 82/10/14. S2102B033'4.
9310280330 IE In.p Repti 50-275/82-30 t, 50-323/98-14 ntl fIJ-jVU Ik
noncompliante nottf Major areas inspected implement* I ion e
indepandent verification progr*mi including indapindirti
Hualif icatloni of pertannel l< imp limtnte t ion of QA fTogran
MORRILL.P.J , ECKHrtRDT, J H , BISHOP, T H Dlvltlonof H\ti-t
Reactor Prajct li Engineering Prograns 82/IQ/OD iff
i, a4X Fiche 50-273,82/10/11.9210200354
Periodic operating reports (c related corrasponitenci
3210290319 Foruarils "Diablo Canyon Nuclear Power Plant InHH^itil
Deijn Verification Program," semimonthlu rapt for Hipt
1982
COOPER- U,E, TBledyne Enginiiring Servlcx 82/09/B4 ^CKr^-u-t
Office of Nuclear Reactor Regulation' Director, ENOfUEW. H H
Rllon S. Office of Director MANEATIB, <J, A PelMt 9*1 t tlt.i
Co. ip, IS634,U9 24X Fiche 50-278, 82/09/24.
9210290322 "Diablo Canyan Nuclear Poutr Plant Indtpin'int C* Ujn
Vtrlf ication Program," semimonthlu rvpt for flept \103
* Talftdune Engineering 6rvlc*. 82/09/24 A9pp
S4X Fiche- 90-279182/09/24,9310290319.
3210130191 Forwards "Bemimonthlv "'P* 23, Diablo Cany an VitllUi IIM
Proflram. " 830921-1004
CRANErP A Pacific Oas d Electric Co B2/10/OB OENfCw, M
Of (leu of Nuclear Reactor Regulation, Director GNGELKCtt, R t*
Region 9, Office of Director lp, 1 3477 294, iHK
FIeh: 30-275, B2/10/OB,92101SX>131
DOCKETED ITEMS
79
--210150159 "Semimonthly Flept 23, Diablo Canyon Verification Program."
B2O92 I - 1 001
HC.CH. J 9 Pacific Gas & Electric Co 82/10/OS Slpp 13i97 295
24X Fiche 50-375.33/10/00,0210150151
9210330197 Forwards "Independent Design Verification Program."
ssrumonthlu rept for Oc t 19B2
COOPED, H r. Teledyne Engineering Services B2/IO/OB DENTQN, H R
Office uf Nuclear Reactor Regulation, Director ENCELKEN, R H
Re? ton 5, Office of Director MANEAT1S.G A Pacific Oai t, Electric
Co 3pp 157B? 241 S4X Fiche SO-275, B2/ 10/OB, 821QS50197
--EJ2I0250201 "Independent Design Verification Program," semimonthly rep t
for Qit 1982
' Telerfijne Engineering Services S2/IO/OB 3<?pp 15787 267
24X Fiche SO-375. 02/10/08, B31Q250197
Advises that FtL Cloud ftsoc iates, I nc has not issued open
ifcen repts during prior reporting period
DENfSOM.e Robert L Claud Associates. Inc B2/1O/OB DENTOM, K fi
Office of Nuclear Reactor Regulation, Director ENQELKEN, R H
legion S, Office of Director MANEf\TI9,G A Pacific Oas E. Electric
Cn Ip 137S3 31S 2flX Fiche 50-275, 03/10/OS, B210250221
8210290222 LEH 02-Q09/Q1T-O an B310O7, tasti ng on auxiliary. i*ltuate.<p
iy* revealed sy* susceptible to uat*r hammer effects during
anticipated operational transient* Caused by uattr column
separation tr recombination at piping <lop e change
KAEFER.H U Pacific QBS & Electric Co 03/10/1-? Region S,
Office of Director 2p p 13893 227 24 X Fiche 30-273, BSflQf IB.
B21O270219
T Hearing transcripts an non-antitrust matter*
8310290370 Unofficial transcript of 831020 public discussion of Phase
II reverif ica tion program In Uaih ingt on. DC Pp 1-113
Supporting documentation end.
i Commissioners B2V10/2O I44pp 15B69-O93 24X
Tien* 50-275, B2/lO/3O,0ai02'?O370
Foruartti- transcript o-P Commission Q2103O meeting to
receive NBC briefing on proposed scope- of Phase II of
independent design verification program & S21O17 meeting u>J
utll J- participant* re program t, 5ECY-B2-41 4 W/o ncl
CHILK.B J Office of fcha Secretary or the Conuni as i on B2/1O/21
Office of th* Executive Legal Director IP 13779 Ell 24X
Fiche 90-273,82/10/21,0310320410
B21O2502-17 Submits Semimonthly Progress Rept 20 for 820903-10O9 Mo open
item repts issued, but tuo open item repts identified
Individuals completed acceptable statements re potential or
apparent conflicts of interest
HEEDV, R F R F Keetfy. Inc Q2/10/OQ DENTON. H H Dffica of
Miff 1 en r Reactor Regulation, Director ENOELKEN, H, H Region 5,
Office of Director MANEATIS, A Pacific Oas 4i Electric Co 2p p
I57B6 342 24X Fiche 50-275,92/10/00.3310250247
orwards DC t 19S2 semimonthly rep t, c onai i ting of Open Item
fiepts Q007~BOaO
C ESTAK.F Stone !. Webster Engineering Corp. Q2/1O/OB DENTDN. H R
Office of Murlear Reactor Regulation. Director EW3ELKEN. R H
Region 3, Office of Director MANCATIB.O A Pacific GIB (. Eloctric
Co 34pp 15790 097 2-1X flcho SO-275, S2/10/OS, 821O2SO30B
D21&EQOI57 Forwards program managers 3rd Friday Oct 19B2 r*pt re
independent design verification program
REEBV, R F R F needy, !nc B2/1O/15 COOPER, H E Taledgne
Engineering Services App 15B37 215 24X Fiche 50-273,03/10/15,
B2103BOI37
D31027O236 Forwards "Diablo Canyon Verification Program," Semimonthly
Rept 24 for B21005-1B per Commission Order CLI-81-30
CfMNE, P A Pacific Gas *. Electric Co 82/10/23 DENTON. H, (I
Office of Nuclear Reactor Regulation, Director ENOELKEN, R K
Region 5, Office of Director Ip 1 5B29 222 SAX
FichP 50-273.93/10/22,0210370236
DOCKET BO-377 PEACH BQTTOH ATOMIC PDHER STATION, UNIT 2
J Insurance & indemnity inf ormit ion
B21006Oa?6 Forward* EndnriBmont 99 to NELfA Policy. NF-140 fc End ors arren
S3 to HAELU PoliCiJ HF-67
B(JADt.E. E J Philadelphia ElactrU Co B2/09/30. SALTZMAN, J
Assistant Director for State & Licen*ee Ralotlani 3pp, 19619 HO6
E4X Fiche 50-H77. BH/09/30,
P Operating licence stage documents & correapondance
9210260013 Respond* to FOIA raquaat for all i nttrna 1 , non-pub 1 Ic
t ocumont, memos, evaluation repti tt other matl dealing u/
nuclear plant operation* Foruard-s doc umtntt listnd in App A
FELTOH-J H Division of IJulei and 1 Racords SB/09/17 MCINNI5,
MIUI b Observer 5pp 19B60 O69- 24X Ficfia 30-000 r Q2/09/I7.
8210280013
B20831Q034 Foruiardi draft info notlo ra dr f i e tune t a* in air filtration
& ventilation BUI, Notice ba&aif on radioactive resin raleas-B
at Pilgrim 1 & on four relatad ivent* at otllBr plants
involving df Icienc iei In maint t tentinj of filter t(j*.
MATTBDH, fl J Division of B u *tmi Integration <pot 911003).
B2/OB/03 JORDAN, E, L Dlviion of Englnnnirlng ( Qualitv
Ass-uranca 3pp ISOi 1-084 &4X Fiche, 30-000, 32/09/1.7. 6210290013
--EJ210370240 "Diablo Canyon Verification Program," Semimonthly Ropt 24
far 92 1005- 1 9
Pacific Oas < Electric Co 82/10/22 52p p I5S3B 233 34X
Fiche 50-375,82/10/22,0210270336
8210SS0211 Forwards "Diablo Canyon Nuclear Pouier Plant Independent
Design Verification Program," semimonthly status rept for
tkt 19B3
CDDPEfl.H E Teledyne Engineering Services B3/IO/23 DENTuN, H, R
Office of Nuclear Reactor Regulation, Director EWQEE-KEN. R H
Region 5. Office of Director MAfJEATIB,G A Pacific Oat & Eloctric
Co 2pp I5H3S 001 34 X Fiche 90-275, S2/ 10/33, SS10SB021 1
B2I0330212 "Diablo Canyon Nuclear Poyer Plant Independent Design
Varlf icatinn Program," semimonthly status rept for Oct
1733
Te Ictfyne Engineering Service* B2/1O/S2 76pp 15038. 003
24X Fiche BO-375, B2/10/22. H2102B021 1
3 Jleportable o c currencies, LERa t related correspondence
B2IO250055 PNO-V-B2-043 on B21016, unusual event declarid when gran
fire started In 500 kV switchyard On 031017, three SCO fcV
circuits tripped, resulting in loss of all offsite pouter
Second unusual event declared
STEFlMBEnO.D M Region 5, Office of Director 83/10/iA Ip
15737 100 24X Fichu 80-275,02/10/14.8310350058
821O2702I9 Forwards LER 82-009/01T-0
EKIFFER.J D Pacific Oas i Electric Co B2/10/18. ENOELKEN.R H
Region 5. Office of Director Ip I5B53 336. 24X
Ftche 50-275,32/10/10,9210390219
8210030320 Forward! "Thermal happing Rept 02-0 For 920018 for Thermal
Monitoring ne-quirxnentii " p*T rtp p B to ETT3
U ILL BEY, W B PhfUdalphta Electric <Ca 82/07/S8 JPPOLITQ, T, A
Operating React ori Branch 3 Ip 13601-336 24 X
Fiche 50-277. 82/09/23. B2100S03BO
B210050321 "Thermal Mapping Rapt 2-3 for BBOB1B far Thernil Monitoring
Raquiramcn t> "
* Philadelphia Electric Co BE/O^/SS 4pp 15SO1 33? 24X
Fit-he 50-277, fla/09/2B,aaiO<JSD320
3210150202 Foruiarde "Rapt oP Plant Startup Follouiing Fifth RFullng
autagi " Tab 19BH
ALDEN.W M, PMladtlphla Electric Co B2/1O/06, HAVNEB, R C Hog ion
L. Office of Director Ip, I57OS' 046 24 X Fiche 50-277-92/10/06,
S21O19D5GS.
8210150292 "Rspt of Plant Startup Fol lowing Fifth Refuilini Ou-tag, "
B20R19
ULRICH, HT Phil*dlphl Electric Co. 82/Oa/2B 7pp. IB703 St>7.
24X Flchi; SO-277, 82/10/04, 8310130202,
82102^0329 Submits info r potential problem u/ventllation sij*
aitaciated w/battary & emergency lulfachgear roomi solution
to p rob lam 4c chadula for conpletion of necetiarv modi Morf
will be completed by 831231
COONEV.r) J. Philadelphia Electric Co 02/1CVI4 KAVNEB, Ft C,
Region 1. Office of Director 3pp. 19803. 2O 9 S4X
Fiche: 30-277. 82/10/1 4. B21 0360029
&2102OQQ46 Foruardi application to amend Licence* DPF1-44 & DPR- 36 to
reflect mods reD,uired to mst crltirin of NUREO-OiAl, App Ai
"Mark I Contninmont Unng-Tsrin program. 1 "
BRADLEV, E J phil*d*Jpha Electric Co. B2/1O/13 DENTON . H, R.
Offico of Nirelo*F Reactor Re-gula-tlon, Director. Ip. 15736:139. S4X
Ftcha: 90-277, BS/lCf 15. sat 0200046
80
DOCKETED ITEMS
-83IC20O063 Application to amend Licn* DPR-44 & PPR-S6 to reflect
modi required to meet criteria of NUREQ-06cl, App rt, "Mark I
Containment Long-Term Prooron " Affidavit 6 Certificate of
Svc end
BWJEfi.E . BRADLEY, E J Phi ladetpfi I. Electric Co 82/10/15
7pp 15754 136 24X Fiche 30-377,02/10/13.6210200046
-8210200063 Proposed Tacti Spec pages, reflect Ing mod* required to mef
cntria of NUREO-0661, Af p AP "Hark 1 Containment Long-Term
Philadelphia Electric Co S2/10/15 6pp 15754 143 H4>!
Flehe 30-377-92/10/13.0210200044
B210070I8B Inu-rvic* imp rept completed during B20220-07Q3 refui.i-|
outage
* Philadelphia Electric Co 82/09/20 96pp 1S439 2?V an
Fiche 50-277, 02/09/39, 0210070177
6210150069 Submit* final response to IE Bulletin Bl-Oli "Gurvel 1 1 - i
of Mechanical Snubfien " Pacific Scientific Co manuftttuni
49 itiechani-cal inubbers ut ill led it facility Hit of jnoifi)
numberi twit I
DALTROFF.S L Philadelphia Electric Co B2/IO/Q4 IIAYJJFB.n C
Region 1. Office of Director 2pp 1S701 341 24X
Fiche 30-277, BZ/10/04, 8210150069
6210210297 Submits addl info re util Bl 1239 response to NUREO-OB03.
"gafstij Concerns rtunciated H/Plpi Breaks In HHJi Scram
Sijs, " in response to MRC 620924 roiuest
DALTROFF.S L Phi larfniph I a Electric Co B3/IO/1B STQLZ. J F
Operating Reactors Branch 4 IQpp 15744 267 24X
Fictie 30-277, 82/10/I9.B21021Q277
B2102IQ33G Proposes B3O131 at date for responding to NUREQ-0737, E tem
II B 3. "Poat-AcclJsnt Sampling Sv "
E-ALTRDrHS L Phi larfetph 1 a Electric Co B2/JO/13 STOLZ.-J F
Operating Reacfcar* Branch 4 2pp 13763 063 24X
Fiche 30-377. 92/10/i9iS21oai0330
IE Info Notice 80-35, Sup pi 1. "Leaking & DUlodftEJ 1-]1
Implant Setrfs " Svc lilt uncl
COBC-L I Diviiion oF Fuel Facilities Materiali A Biltjvtttt
32/JO/OG Coninlidated Ediion Co of New York Aftpp 13741 J'
24X Fichc SO-000, 82/IO/O6, 0203190233
62-10130291 Ack receipt of B20929 Itr informing WHC of tttfn
correct vlolationi noted in IE Imp Repti SO-277/Iia- 14 t,
50-278/B2-14
srAROSTECHI.H Diviiton of Project t Rendent Progrann
DALTROFF, S L Phi Jadelph ia Elec trie Co lp 1S670347
Fich 50-277,82/10/06.9310130291
e2102S019i For ward i reioonie to draft tachnical evaluation rep t re
cdntral of heav<| load 1 * Addl info r*nuitd In 620405 tetcon
one 1
DALTPIOFF.S L Phi 1 atlHtpli ia Electric Co 82/10/33 STQLZrJ F
Operating Ksacton branch 4 43pp 13339. 136 24X
FichB 30-277, B2/1O/3S, 82I02BOI96
0210130296 Reipondi to NUC B30901 Itr re viqlatic.nl noted In It. I
Rapti 50-277/BS-14 tc 50-27D/B2-14 Corrective acttoni
de'vctlva lacking machanlim replaced t periannel intructtiJ
to b mare forceful when checking locked doors
DALTROFF.S L Phi ladel ph ia El ectri c Co Q3/O7/a<?
Division of Project 4 Residatit Programs 2pp [SA7S1 HI!
Ffche 50-^77, &2/10/06i E3H10I3O391
0510230193 "Structural Andlijili of Peach Bottom Uniti 3 fc 3 Ktactor
Prexiure Venel Kearf Drop. Shroud Hnad Aiienbli; Drop d Bto*ra
Dr^ar Aiaemblu Drop Condition! "
HEBREW, M L , MQK,<? General Electric Co B3-33 82/OB/31
3Bpp 1SB39 IS1 H4K Ficfia 50-277, B3/10/25. 62102a019i
~Bal02aOS01 "Lifting DevicBi & Lifting Point* Strti* Anali/iii for
Reactor Preiiure Veisel If* ad Sti-orm-bad, Stoatn Dri/er/
Saparator Sling & S^c Platform to Caaptij U/NUREO-0612 for
Peach Uotton Unit) 2 t. 3 "
KOMQ.V H General Elactrlc Co WSE-M-03BS 83/05/31 3tpp
13839 219 24X Ficlie SO-Z77, BS/ 10/23,831 02B0194
aal02BOB04 "Liftlnj Device* t< Llftins Polntt Slre* Analyiin for Fuel
Pool Oate Lifting Paints^ Hgdraul Ic Tenilonar Lifting Device
tt Lifting Points 6 Reactor Presur Venel Insulation
Removal Lifting Device b Insulation Lifting Points "
SIUHBKI.TJ Philatfeiphia Elettric Co WSEQ-72-07B2 B2/07/3I
29pp 15B39 HSO 24 FichB 50-277, B2/10/H5. 82102DOI 96
IE Bullatin Q2-03, "Btress Corroiinn Cracklfig In Ihuk-
MaSl' Large-&mmeter.St*lnIeu Steali Rec ircu lation Gy*
Piping at BWR Plants " Svc list encl
DEVOUNO.R C Director's Office, Office of Inipectlan anil
Enforcement 83/10/14 Consolidated Ediion Co of Neu York
HSpp I5B1O 133 24X Fiche 30-000, 02/10/ 14, B20nif03.ta
R Periodic operating reports & related correspondence
B2101S0336- Forward* Thermal Happing Rep t B2-4 for B209CW for ^r*
monitoTing requirement*, per App to ETB
UILLSEYiU D Philadelphia Electric Co B2/10/OQ
Operating Reactor! Branch 3 lp 13704 277 24 X
FichB 30-277,82/10/08,6210150336
B2101303-&D Therm*! Mapping Rept 82-4 for B20909
* Philadelphia Electric Co 82/10 /OB 4pp
Fich* 30-277,aa/10/OB,Bai0150356
Inspection rsportsi TE Bulletins fc correipondence
B210070317 Foruards IE Imp Rept* 30-277/92-20 b 30-270/82-1? on
630-916-20 t- notice of violation
MARTIN, T T Division a? Engineering &, Tichnlcal Program* B2/09/B2
DALTRDFF.aL Phi UJ*lph la Electric Co 2ap 19634,139 24Y
Fich* 50-277, 62/07/22, B310070317
8210070322 Notice of violation from ln*p on BEOB 16-20,
DIvition oP Engineering b Technical Projranis
13634 137 Z4X Fiche, 80-277, 82/09/22,821 0070317
B21022O190 Foruardi- monthly operating repti For Bept 1102
COGNEY.JI J Philaifelahia Electric Co 83/10/13 Dlretl^r '
Offlcaj Office, of Inspection and Enforcement lp JB777 2'3
FichB 30-277, 82/10/13- B210230190
B210220194 Monthlg operating repts for Bept 19P2
ALDEN.HM Ph i larflphla Elec trie Co B3/10/19
24X Ficho 50-277,82/10/19,0210220190
lOpp
3 RcportaltlB occurrences, LERi t, related correipondinca
B210070330 IE In*p fipt 50-277/62-20 fc SO-27B/S2-19 on B20816-20
Nanconpl lance noted no notification given for abnormal
degradation In primary containment, evlileiicel by unacceptable
local leak rate t*st resulti for nine Isolation valvei
PULLAN!,S V , BETTiEMMAUBEW.L Diviilon of Enainrlno li Tecnnical
Programs 82/09/14 7pp 15634 13B 24X Fiche , SO-H77, BH/O9/22,
921007O317-
B210150299 Forwards IE In.p Repts 80-877/82-19 t BO-K7ES/S2-1 9 on
820807-0915 No nonccmp I lance noted
ErAHOSTECKI,R Divition of Pi-ojsct l> Ruldent Programs. 05/09/27.
DALTRDFFi 8 L. phi l*dl ph ia El ectr it Co Bpp 1S707 334 SIX
Fiche- 30-277i B2/09/a7r 3BI01 S0299
~flal015030'2 IE Insp Repts 50-277/S2-J9 t SO-37B/B2-I8 on e20B07-0?lS. No
noncompliance natif Major anas inspected opr*tic-n*l
laf ttij, radi atioii protectloni physical ttcuritujr control roon
ctlvltlai i IE bulletin followup,
BLQUOrf, A ft. , MCCANE, E C Division of Projact h Reslitent PrDgrvmi.
B2/09/20 l?pp. 18707 236 24X Fi eh' 50-277, B2/09/S7, B210130299.
B210O60074 Foruardi LER B2-027/01T-0 Detailed event an'lutlt <"t
CDOMEV. M J Philadelphia Electric Co B2/09/24 HAYMfS.R C
Region 1, Office of Director 3pp 1561S 047 24X
Fich". 30-277- B2/O9/24.B210060074
8210040033 LER 63-087/011-0, on B20910, *vc air valve to conUi r
found open Caused by ptrionntl failure to make entrv In
locked valve lo-g book uihen valvei opened Valve claftd V
lackBd
COQNEY.M.J Philadelphia Electric Co, 82/09/24 Rigid*
DfPiee of director lp, 15619 050 24X Flche, BO-377.
6Z1 0040074
32IOO6O393 LER B2-O2S/03U-0 on B20B27, cuh 1 IB performing t
teit'C RHR piimp room C cooling fan mould not start ill
utnmatic Caused bij corroded contacts on C fan suite*
DPS O4OO-16 Siultch reulred b calibr
COOMEV.H J Philadelphia Electric Co 02/09/34 KAVS r C
Ration 1. Office of Director lp 13613 194. 34 X
Fith BO-E77 J Sa/09/24.B2I0060333.
B210070I77 Forwards inservlce intp rept canpletm during 820220-0703
refueling outage, In-ij rnuiTmmti mt tati sCactorl 1(|.
CQONEV.M J J>hilad<lphla EUctPlc Co 82/09/29 HAYNEB, R. C
Rtgian 1, Dffic* of Director. lp i363S 298. 24X
Fiche. 80-277, B2/09/S?, 8210070177.
DOCKETED ITEMS
81
821QQA0047 LEO 93-026/031-0 an 830900, LIS-2-3-73B, real tor Lo-Lo-Lo
Eontainment i prag interlocl discovered out of calibr
Caused bu setpaint drift af Rosemont Model 1151 trip unit
Drvl ce recal i tr
COQNEY. M J Philadelphia Electric Co B3/09/H7 HAYNES, R C
Region 1. Office of Director IP 19615 OBB 24 X
Fiche 30-277, 82/09/27,8210060047
B21G060177 LER B2-036/03L-0 on 02O831,RHfl pump 2A failed to start
during test on Ffl-2-10-143 Caused by uncharged breaker
closing; spring due to faulty closing latch monitoring switch
COO-JEV, (1 J Philadelphia Electric Co 33/09/30 Region 1, Office
-of Direttor Ip 15615 099 24X Fiche 50-277.92/09/30,0310060177
6210]S04Cl> LER B2-031/03L-Q on 820B31, smoke detector 314 in Hnmrgencij
suit^hgear room B failed to cal ibr to Tech Spec limits
Caused dij Faulty imotc detector Detector replaced
COUNEV.M J Philadelphia Electric Cp Q3/09/30 HAVNF8, R C
Region I, Office of Dirsctnr Ip 1 57O4 029 24X
Fith* 30-277. H3/O9/30, 921O1 50400
6210150194 Forwards LER G2-Q30/O1T-0 Detailed event analysis submitted
COOMEV.H J Philadelphia Electric CD 83/10/01 HAYNES, R C
Region 1. Office of Director 3pp 13707 311 24X
TicNe 50-377. S2/1O/01, BS1Q1 50184
--02I0050321 "Therm*! Mapping Rp t B3-3 for 820B1B for Thermal Monitorinc
Acquirement! "
Philadelphia Ele.-tr-Jt Co Q3/09/3B 4pp 15601 339 24X
Fiche 50-277,82/07/28.9910090330
S210260329 Submit* info r potential problem u/vnti latinn sys
associated Li/battery & emaroencv luitchgoar roomi. tolut ion
to problem b schedule for completion of nac eviarii mods Modi
will be completed by 831231
CQONGY.M J Philadelphia Electric Co 82/1O/14 HAYNEB. B C
Re-oion 1. Office of Director 3pp 1SBO3 SOS 24X
Ftche 30-277,82/10/14.8210360329
8210EQ0016 Forwards application tc- amend Licenses DPR-44 & DPR-56 to
reflect modi required to meet criteria of NUHEO-Q661, ftpp A.
"Mart I Containment Long-Term Program "
BRADLEV.EJ Philadelphia Eloctric Co 82/10/15 DENTON, H R
Office of Nuclear Ftoactor Regulation, Director Ip 1 37S6 135 24X
Fiche 50-277, 82/10/15, 8210300046
6210300043 Application to amend Licenses DPR-4fl t> DPR-SA to reflect
mods reo.uird to maot criteria o* MUREQ-Oitl, Ap p rt, "Hart I
Containment Long-Torn* Program " Affidavit t Certificate of
Svc end
BAUER, EC , DRADLEV.E J Philadelphia Electric Co 83/10/15
7pp 1973S. 136 24X Flcih* 50-277, 82/10/ 1 5, B31020004&
--3210I5O179 LEfi 82-030/OIT-O on 020917, u/both units at power, imall
quantity of slightly contaminated water released from
recorbiner bldg into stoim drain SIJB Caused by spurious
action of Orinnell Madel 6 fire lupprescion valve
CQDHEV.M J Philadelphia Electric Co H2/10/01 Region 1,
Of fit* of Director Ip 15707 314 34X Fichu 50-277,83/10/01,
3210150154
nlO2e.O113 LER B2-029/03L-0 on S209I 5, dur ing power, supervi sorg fllarm
occurred indicating firo sys problems Investigation revealed
beat detectors in startup suitchgear bids inoperable Caused
&Y disconnected circuit breaker due to stripped screw
CODMEV.M J Philadelphia Electric Co 82/10/14 HAVNES, R C
Rag ion 1, Qffico of Director Ip 15005 247 24X
Fiche 5O-377, Ba/10/lfl, S3103601 1 3
82I039O36A PHa-I-B2-06B on 821024, pr imary sijs relief valve began
cjcUrsg during startup after moint sh utdoun. causing iiji
5'jjelJ which resulted In feed pump trip on high reactor uater
level follauej! till low love] icram HPC I manually Initiated
I'.CCfiBE.E C , KEIMIfl Ragion 1, Office of Director 83/10/25 Ip
SS053 031 34X Fiche 90-277,02/10/35,8210390366
DQCKEF 50-2'7a PEACH BOTTOM ATOMIC POWER STATION, UNIT 3
J Insurance ti Indemnity information
6510060296 Forwards Endorsement 99 to NELIA Policy NF-140 t, Endorsement
5a to HAELU Policy MF-67
URADLEV. E J Philadelphia Electric CD 83/09/30 3ALTZMAN, J
Alii 4 taut Director far State & Licensee Relations 3pp 1961? 20i
24X Fiche 50-277,82/07/30,0310060396
P Operating license stage documents & correspondence
B207-09G201 Forwards application to amend License DPR-56, changing Tech
Sp*ti to reflect changes to ODYN computer code ti including
F!vUlon 1 to "Supplemental Reload Licansino Bubmittal for
Peach Cotton Unit 3, Reload 4 "
OPADLEV.E J Philadelphia Electric Co 82/07/06. DEN TON - H R
fifties of Hue 1 ear Reactor Regulation, Director In 13708,113, 24X
Fiche BO-27B, B2/07/06, 620709O2O1
--03O70903O8 Application for amand to License DPR-B6, changino Tech Specs
to reflect changes in analgsei resulting from corrections to
ODYN computBT code
DALTflOFF.3 Phi Udelph la Electric Co 82/07/06 6pp 13708.113
24X Fiche 50-27B, B2/07/06, 0207090H01
9207090315 Tech Bpec Tables 35K2S.35K31, Flflures 3 3 K 1 t,
3 5 K a, suppnrtinB application for amend to Lic*ne DPR-3i
i Ph(ldlpJiJa Electric Co. 82/07/06 4pp 13788 120 24X
Fiche 30-278,32/07/06,6307090201
--B2O7O70234 Revision 1 to "Supp 1 amenta 1 Reload Licon*ino Submlttil for
Peach Bottom Atomic Pouer Station Unit 3. Raload 4 "
LEASER. -J D , ENOELiR E General Electric Co YI003J01A20 HOI.
82/Oi/SO 41pp 1378B- 124 24X Fiche 90-S78, S2/07/Oo, SS07090SO1
B2102000AB Proposed Tech Spec page*, r of 1 net ing mod* reqciired to meat
criteria of NUREO-06A1 , rtpp A, "Mark I Containmsnt Long-Term
Program "
* Philadelphia Electric Co 82/1O/I5 (bpp 15736 143 24X
Fiche 30-277, B2/1O/13, B3102OOO4&
8210210297 Submits odtfl info re util 811229 rnBponse to NUHEQ-OB03,
"Safaty Concerns Associated W/PIpo Breaks (n OHR Scram
Byi," in response to NRC 920824 request
DALTROFF, 8 L Philadelphia Electric Co 82/10/19 8TQLZ, J, F
Operating Reactors Branch 4 lOpp 13764 267 24X
FiChB 30-377, 8K/10/13, B21021Oa7
S210210330 Propose* 83O131 as date for i>ep and ing to NUREO-0737, Hum
II 11 3, "Post-Accident Sampling B<fi, "
DALTROFF, 8 L Philadelphia Electric Co SS/10/13 BTOLZ-J F
Operating Reactor* Branch 4 2pp 13743 O43 34X
Fiche 50-277, 82/10/13, B2IOHIO330
8210220006 Forward* application to amend Licao* DPrt-Bt, request Ing Tech
Spec change to ertend 1 insp intarval applicable- to two
inacoiilble hijdfaulii: nubb*r
BRADLEY.E J Philadelphia Electric Co Ba/lO/19 DEN TOM, H Fl
Office of Nuclear RaactOT Regulation. Director Ip 13778 219 24X
Fiche 30-270, 02/10/19, a310BaoO06
S210220007 Application to amend Licemo DPn~36, ch^noing Tech Spots to
extend Imp interval applicable to turn Inaccenlble
hydraulic snubbers CertlPlcat' of Bvc arcl
BAUER, E , BRADl,eY,E J Philadelphia Electric Co BS/10/19
6pp 1377S 22O H4X Fich 30-378, GS/10/ 19. B21022000t
82102S0196 Forwards response to draft technical evaluation rept re-
control of heavy load* Arfdl info requesfied In B20405 lelcon
encl
DALTROFF.SL Phlladelph la Electric Co 82/10/23 STOLZ, J F
Operating Reactors Branch 4 45pp. I9B39 136 24X
Fiche SO-377, B2/10/2B,Bai0280196
B2102B019B "Structural Anftlijiit of Peach Bottom Uniti 2 b 3 Reactor
Pre*ore Vet**l Head Drop., Shr-oud Head 1 Aisembly Drop t Bteam
Drv*<* Aisemblg Drop Condi tiom "
HEF)RERA,H L , HOK-O Oeneral Electric Co, 83-33 H2/OB/31
38pp 13839, IBI B4X Fi chn- SO-277- a2/lO/S3, B2102S0196,
B2I02BOS01 "Liftlna Devicei- fc Lifting Polnta etr.it AnaLyiU for
Reactor Prsun Viol Head Stro-ngbacV, Steam Drgir/
Separator Sling ft Svc Platform to- Comply W/NUREO-OA12 for
Peach Bottom Units 2 !. 3 "
KONO.Y.H, Oaneral eiactrte Co NSE-SO-OSSa 82/OS/31, 31pp
1983? 219 S4X Fiche'30~a77 J 02/10/85,0810280196
-82102B0204 "Liftlflfl Device* & Lifting Point* etre*i Anal v *t* for Fuel
Pool Oate LiPtino Points, Hgdraulic Teniionor Liftlno Devico
tc Lifting Point* & Reactor Praivure Vee.set Insulation
Removal Lifting Devico t, Insulation Lifting Point* "
SZUMBKfjT J. Philadelpnia Electric Co, , NBEO-72-07B2. 83/07/31
29pp 13839, 230 R4X Fich: 30-377, 82/10/39, 0210880196.
8210030380 Forwards "Thermal Hipping Rept 0B-3 for 820818 for Tharal
rfonltoring ftequirementsi " per App B to ETB
W1LLEEY, W B Philadelphia Electric Co 82/09/2B IPPOLITQ, T. A
Operating .Reactors Branch 3 Ip, IS6O1.3S8 24X
Fich* 30-277, 62/09/20,6810050320
82
DOCKETED ITEMS
Q Insptction reports, IE Bulletin* & correspondtnce
6S1Q07O317 Forwards IE Intp Rtptt 9Q-S77/B2-20 it 80-279/82-19 on
820816-20 & nutlet of violation
MARTJNrT T Division of Ensinttrlno t Technical Prograns 83/09/33
DALTRQFF.B L Ph i laddph I* Electric Co 2pp 19634 133 24X
Ffehe 50-B77, 82/09/32, 8210070317
6210150369 Thermal Mapping Ript 02-4 for BS0101
Philadelphia Electric Co B2/10/08 4pp
Fiehe 90-277.82/10/08.8210130396
13704 27.Q
02102EQI90 Forwards monthly operating rapts far Bipt ITBS
CDOMEYtH J Philadelphia Electric CD 02/10/15 Dirt(tE*'
Office. Ottlcr at Inspection and Enforcement Ip 1577J ZJ3
FJche 50-277, SS/10/I5.8210220190
--321007-0330 IE imp nrots 50-277/02-20 h go-27&/8e-i9 on
None a rap lie-nee nnteJ no notification given -for abnormal
dfegridation In primary containment, tvidenced by uneccip talili
local tiak rati tot resulti for nine isolation valves
PIXLAMIrB V , BETTENHAUSENiL Civilian at noln*iring b Technical
Programs. 92/09/14 7pp, 1563*. 133 24X Fl the- 50-277. &2/09/S2,
B210Q70317
8210070294 ForuariSl IE fnp Ript 50-270/91-23 on 811013-15
MARTIN, t T Division of Engi-niiring t Technical Programs
DALTROFF.S L Pfi i ladelptii* Electric Co Spp 15634-2Ifl
Flch* 90-278,92/09/34. B210070296
92/09/24
24X
9210070308 IE Tmp Rpt 30-278/81-28 on 811013-19 Noncosip 1 ianct not id
Pailurt to follow radiation protection procedure ft promptly
notify NRC In atcordanct u/lOCFRSO 72
NIKITE.R L , SREEMMANiE 0. Division of Englntrrfng ti Tichnlcal
Proj ram*. 93/07/26 10pp I5&34 320 24X Fith* 30-E73. B2/09/S4.
BB10O70296
6210130299 Faruardi IE Imp R*pti 50-277/aa-t9 *. &0-27Q/S2-IB on
920007-0719 lit noneompltinc* rated
&TARCI8TECKI.R, Division of Pro jut I t. fluidtnt fragrant BSfOt/S?.
DALTRDFF-S L Philadvlphla Eltctrlc Co 2pp 19707 234 24X
Fich: 50-877, aa/09/S7, 8BI0150279
0210150302 IE Imp Rpti SO-277/0B-19 i 50-278/82- IB on 0EOB07-0913 No
nancomplianc* notd Major artai inijitclnf, operational
laf itifi rad 1 ition t rotactionj physlol ncurltiji control room
actlvlbln It IE bullitln -fcllouup
BLOU-IH, A R. , HCCANE, E C, Diviilon of Prajact !c R*ildint Pragrarai
S2/07/20 19pp 19707236 24XF(cht SO-B77, 92/09/a7.fl2i 0150399
6208190233 IE Info Notice QO-3S, Suppl I, "Laaklng ti DUlodj*J 1-129
Implant Ond-i," Bvc Hit incl.
COSB.L I Diviilon of Full FjclHtUt. Mat trial I h SafaguaTds
82/IO/O4 ContoliJatid Edlion Co of Niu York 46pp 19761 290
24X Flchi-90-OOOi02/10VO&. 8200190233
821O1302?! Act rcctipt of 020929 Itr informing URC of (tips takan to
cornet vlolatiani not*d In IE Imp Rpti SO-277/B2-14 I.
90-27B/B3-14-
STAFIOSTECKIrR Diviiiotl at Projrct & fltildant Programs B2/ F 10/0&.
DALTROFF.SL Phi ladtlphia El ictrle Co, 1 p. 1 S&79 317 84 K
Fleh: 50-2774 B2/1O/04, 0210133291
a21013O29& Rtspondi to NRC 820901 Itr TI violation* noted In IE Into
Rapt* 50-277/82-H (. 30-270/03-14 Corrctlv actions
dtttctiv* locking .ntcharUiin rplac*d i ptrsonnl Initructid
to b mare farcaful uhin checking locktd doori,
DALTflOFF. 8 L. Philadelphia EUctrit to 82/07/3. STAflOSTECKI, R,
Division if Projitt t Retlrftnt Programi, 2pf 19o7fl 34H 34)1
Fich. 80-277, 82/10/06, 8210130291.
6300190238 IE BjlUtin Q2-03. "Strtsi Corroiion Cracking In Thlct;-
WaIlrL*rji-Di amtttr. Statnltii Btnlr Rc irculatlon 9(/t
Piping at BHS Plant I " Bvt lUt ncl,
DEYOUNO,R.C Director's Offlcti OfPIci of Inapictlon and
EnfoTctmint. 82/10/14 Coniol idattd Edison Go. of Mini York
I19pp I SB 10- [25 24X F(ih. SO-DOO, B2/ 10/14. B20B17023S
3Z1022000& Forward! application to am.nd Licima DFfl-SSi riqut Ing Tich
8pic chang* to iiittnd Imp inttrval appllctbl* to tuo
inaq<t*iib li hydraulic tnutibart.
BRADLEV,E.J. PhiladilphU Elctric Co BZ/tO/19 DENTON.H R.
Qttit* at Hue liar Rtactor flieuUtioni DJTietor Ip, 13779:819, 9'X
Flchi. 90-27B, 82/10/19,9210220006,
--82I0320007 Application to anind Llcim* WR-36, chang inj Tich Spacs to
iitind imp Intarval appliobli to tuo inaccmlbl t
hydraulic inubbart, CirtllJcti of Bvc incl,
BAUER, E. , BRADLEr.EJ Ph 1 ladllphia El ictric Co, 02/10/19,
&pp. 13779:220. 24K Flchi.SO-a7B, B8/10/ 19, B210220006.
R Periodic ptrating rtporti 1 rtUtid corritpondenc*
B21019039& FoTU.rdt Thirnal Happing Rtpt B2-4 Pop 82090? for th*rl
man i tor ing rtquirenantt, per App B to ETB
HILLSEy.H B, Philadtlphla Elictrlc Co BS/IO/OB. IPPOLlTDj r A
Operating R*aetort Branch 3. In 13704:277. 24 X
Ficht. 90-277. 82/10/03,8210180396.
S210220194 Monthly opirating rapts for Sipt 1903
ALDEN.W ft Philadelphia Electric Co 02/10/13 IDaa
24X Ficha 30-277, B3/IO/19, B210220190
S Riportable occurrincn, LERt & relatsd corrt ipandmu
S3 10 070474 Diicuins 810225 manual icram of rtactor *Mir
FHR relai) logic A ilgnil Initiated ilmultanioui clgivri
uf both recirculltion pump dlichargi valvai All bltlirv
ground tracing should bt dani u/oh/nitir u/o fum
A6HE.F Dlraitor's Offici 81/04/17 Dlnctar'i H/f
15444 351 24X Fich 90-27B, 81 /04/17, B210070474
S21001000B Rlpondl to FQIA rciiuist for 19 cmtt-gorili ol Jcm.lt'* 1 '
nuclear rtactor ivtnti ti iafitv problfmi Foruirdl docuiitnti
llitid In App A
FE4.TON. J H Division of Rulis and Records B3/Qt>/30 I/MIL **
Critic*! hUti Energy Project 15pp 15727 003 24i
Flchi 90-000, 02/06/2B,821001000S
0210050023 Discusses 810229 * Imul taneous cloiuri of rttlii*!* 1
dlschargi valves Event occurred uihlls station (inn-fnrl rt*
attimpting to rimove ground assoclatiil u/A dlv nl iai-vtt
dc iiJb(jilem
ASHE.F Director's Offlci Bl/04/17 Dlrictor'i QtHtf
15729 039 34X Fichf 90-000,02/06/28,0210010000
8210060017 LEfl 0a-019/03L-0, on 020B22, druwi 1 1 pniuri rtlerli
failed dounscale Caugid bg blown fusi Fust riplictd I 1*1
optratlon varifl*d
COOMEV.K J Philadelphia Elictrlc Co 02/09/31 HAUJE9 *
Region 1, Qtticf of Director Ip 19619 QB! Hi.
FlchB, 90-278. fla/09/81, 021 00600 17
B210I3022A LEH Q2-017/03L-0 on 020902, during huvij rtlnilgi*, tpi
uburved that vtnt stack flour recorder Indicatitf dou-nmli
on both channels Catifid bij pilot tube* filling w/uitt-r
during tevar* itorm Indication returned yh*n ilur* tuttUfl
COONEY.H, J PnlladilpMa Electric Co B2/10/01
Region 1, DffUi of Dlnctor Ip IS679 009
Flch:BC-27B. 08/10/01,0210130226
DOCKET 90-2BO 8UBHY POWER 0TATION, UNIT I
F Bfcuritv, midical, emergencv t< fire protection plint
Q210010156 Act recilpt of B20020 responstt re mrgfnttf f
dif iciBtvcy Items per 020406 confirmation of action Itr
Corrective action & plant ulll be eianlned during
sub ivquent insps
LEMIB-R.C. Division of Project *. Risldint Prograi
LEASBUflO, R H Virginia Elictric ti Fouir Co Ip- KM] If!
Flcha 50-200,02/09/10,9210010196
0210010129 Forwards revised security training d quill fit U p.r
Plan* withheld,
LEASBUnO, R H Virginia Electric t* Pouir Co OH/Of/17 M**'
Office of Nuclear Riactor Regulation, Director, VMOa.B *
Operating Reactors Branch 1 Ip 19966'013 34 X
Fi che -30-000, 83/09/17,8210010129
8210030076 Submits correction to B20628 Revision 3 to ruia-n
NUSEO-0737, Item 1.0,2, "Safetu Parameter DllpUu G^i "
Correction ihould be Included In tchedular eiciptloni
pertaining to imirgencu nsponte capabilltle*
LEASHUflO, R. H, Virginia Electric h Pouer Co. 03/07/M WV
OP*Ic> of Nuclear Reactor Regulation, Director. ElKhlfJT.&l
[Hvlijon of Licentlng Ip, 13603:109 24X Fteht -*!
aa 1005 0074.
9210210050 Rtleatu public version of changes to minim*
Imp lamenting procedure
FELTON, J M Division of Rulee and Records. 03/WiW
Mngtmtnt Branch Ip. 13774' 109. 24X Flehe. DO-OBO.
9210210090.
DOCKETED ITEMS
83
--B21O21CQ53 Foruiarils public version of Change 1 to Emergency Plan
]P Jxnentin j procedure EPIP-4 II, "Folloiuup OffsitB Release
Anenmenti " Change 3 to emergency plan re NUREO-0654
cross-ref 6 Change 3 modifying Table 5 1
DEWANDEL, E_ P Virginia Electric t- Pouier Co 02/09/17 NRC - No
Detailed Affiliation Given lp 15774 110 21X
Fiehe 50-aeo. aS/09/2?. B2102IQ05O
--83I02JQOS5 Public version of Change 1 to Emergency Plan Implementing
Procedure EPIP-4 11. "FollOLiup Offijte Release Assessment "
Virainia Electric 4 Power Co 82/09/17 Spp 1 8774 111 SAX
Fiche 50-280.62/09/29,0210210050
021021005B Public version of Chang BE 3 t 3 to emergency plan re
NUflEG-OfaSfl cross-raf t, Table 5 1, "Mm Shift Manning
Requ I renent i, " respectively
Virginia Electric (. Pouir Co 02/09/17 IQpp 15774 113 24X
Fithe 50-2BO, ea/09/39, 02102100SO
Operating license stage document! & correspondence
32102B0013 Responds to FOIA request for all i nternal , non-publ ic
documents, memo*, evaluation repts t> other matl dealing w/
nuclear plant operations Forwards documents lilted in App A,
FELTED, J M Division of Rules and Records 03/09/17 MCtNNlS-D
Neui t Observer Spp 15B60 065 SAX Fiche 90-000,82/09/17,
B21 02300 1 3
32003)0034 Forward* draft Info notice re deficiencies in *ir filtration
b ventilation tilt Notice based on radioactive resin release
at Pilgrim 1 & On four related events at other planti
involving rfefic tencies in maint It testing of filter iu,i
WiTTEDN, R J Division of Bys temt Integration (post 811005)
Sa/OayOS JORDAN-EL Division of Engineering d Quality
Assurance Spp 15B6! 034 24X Ficha 50-000.92/09/17,0210280013
J3IOIS0265 Informs of implementation status of NUREO-0737. Item II D S,
'Plant EJileld ing" per NHC 020517 requeit All required HOT*
Completed
LE/vSQURO,R H Virginia Electric (. Pouer Co 03/10/01 BENTQN, H R
Office of Nuclear Reactor Regulation. Director EIBENHUT.D
Division of Licensing 2pp 15651 230 24X Fiche 50-000. 02/10/01,
BS1O1 20265
Forwards errata to Topical Rept VEP-FRD-33, "VEPCO. Reactor
Core Thermal-Hydraulic Analysis Using COBRA IIIe/MIT
Computer Coda "
LEASBUnO.R H Virginia Electric tt Power Co B2/IO/04 DENTONj H R
Office of Nuclear Reactor Regulation. Director EI8ENHUT,DO
Division of Hcn*ing 2pp 15652 330 24X Fiche 80-000.02/10/04,
62(0120297
-6210120305 Errata to "VEPCO Reactor Care Thermal Hydraulic Analysis
Uiing CDEfJtA-irie/MIT Computer Code "
* Virginia Electric (c Power Co VEP-FRD-33 ERR 82/10/04 lp
15632 333 24X Fiche 30-000,03/10/04.0210180297
310120110 Forwards payment of requisite technical revieu fee* for
Internee map l< testing program
LEASHURO. R H Virginia Electric & Pouer Co S3/10/O5 DENTONi H R
Offlte of Nuclxar Reactor Regulation, Director VAHOA, 8, A
Derating Reactors Branch I lp 19651 830 24X
FitJie 50-2BO. 92/10/03.0210120110
92IOS2017O ForuB-rd* corrected drauing r* 1 1/3-inch drain valve
-hS-74 Vilvt Incorrectly Ijbtlid 1-K3-SOB in B309i5 1 fcr
LErtSBUHO. R H Vlrqini* Electric b Power CD, 82/10/16 DENTON, H R
Office of Nuclear Reactor Regulation. Director VAROA, B A
dpBratlttg Reacto-ri Branch 1. Spp 1 977H 043 24X
FUh* 50-280, B2/10/IB, 6210220170
821O22-017S Comments on avaluation of lignificant dynamic load* in
determining rapacity of ilings used * &r NUnEfl-O&lS Rating
can ba iaf*lu .jprmad in term* of m*i static load
LEASBURO, R H Virginia Electric & Power Co 93/10/18 DENTDN, H ft
Office of Nuclear Reactor Regulation, Director ErBENHUTj & 0.
Division of Licensing 2np 1 5777 293, 34X fMch* 9O-OOO, H2/ 10/18,
0210220179
B2102QOHit Informs that containmBtit purge valve qualification program
for 36- inch c attainment purge valve* completed To ensure
prevention of radloaictJve rel em* e, flntii automatic isolation
valve yill b> installed
LEA6BUR&, R H Virginia Electric d Pouj.r Co BH/ 10/25 DEM TOM, H n
Office of Nuclear Reactor Regulation,, Director VAfJOA, S A
Operating Reactors Branch 1 Spp 1 5SG7 316 B4X
FlcM 50-2SO, G2/10/23, B210280266
021O2S013O Informi that review of neeJ -fuel co-ntainar lifting rig
completed Rig da*s not comply u/Parag raph 3 2 I 1 of
ANSI N14 6-197B Proposed design mod for conformance being
reviewed !< will be implemented by 940323
LEASBURG.R H Virginia Electric fc Pouer Co 92/10/20 DENT ON, H Ft
Office of Nuclear Reactor Sngulation. Birec tor EISENHUTiD C
Division of Licensing lp 15B37 1&3 24X Fiche 30-2BQ. B2/ 10/33.
9210230130
Inspection reports. IE Dulletln* b c orreip onjftc
Q2100B0015 Addl response to FDIA requent for 19 categories of info re
nuclear reactor events & safety problems Forwards document*
listed in App A Document* fn App 19 completely ulthhvld (ref
FOIA Exemption St
FELTON, J rl Division of FHiles and Recorda 82/O7/1B UDELL, n, A
Critical K*ss Energy Project 9pp J56A5 O27 S4X
Fiche 30-000,02^07/12,8210000019-
0aiO000154 Sytep)>tlc a**e**ment of liceniee performance note-a re
facility evaluation for May 1 97'7-Apr 19BO
4 NRC -Ho Detailed 1 Affiliation Qlven 80/O1/GO 6pp,
1SA60-O51 24X Flche'50-OOO, B2/07/ la, 821 OOBO019
5209340421 Act receipt of util S20607 1 tr l< paumvnt of civil penalty
Dated on reviviu of inc lden.ti.no. baits for remission or
mitigation of penalty Identified
LIGBERMAN-J Enforcement Staff B2/O7/39 LEAaSUHO. n H Vtt-flinia
Electric ti Pouer Co 3pp 19974 313 31 X Fichu 90-2BO, BS/07/St,
8208260124
8706160306 Respond* to NRC 8203 10 Itr re violation* nattt In IE Inap
Rpt DO-2BO/B2-58 Corrective action* ore* tar tup chvckllit
lull! be per farcied by initrument supervl*or & all employee*
counseled re procedural compliance
LEA0BURG,R H Virginia Electric h Pouier Co B.2/0&/O9
DEYOUND.R.C Director's Office. Office af Inspection and
Enforcement 4p|i 15574 aii 24-X Fiche SO-aBO. B2/07/a9i
82OB2&O494
2JO12023B Foruards payment of requisite technical revieu fees for
relief renusts f' ola requirements of ABME Section XI
LEASBURQ. R H Virginia Electric tt Poyer Co B2/10/05 DENTDNf H R
Office of Wuclei- Reactor Regulation. Director VAfiQA, S A
Operating Reactor* Branch 1 lp 19632210 24X
Ffclie 30-aSOi 82/10/05.0210120353
SID200Q43 Application for amend to Licenses DPR-38 b DPR -37 consisting
o* proposed changes to Tech Spec* modifylnfl reporting &
notification requirements
4-EASBUROrfl H vifBinia Electric *. Pouer Co 02/10/06 DENT ON. H R
Otfitm of Nuclear Reactor Regulation, Director VAROAr S A
Operating Reactor* Branch 1. 3pp I5737'2a3 24X
rich* 30-280, 02/10/06,8210200043
-8210200046 Proposed changes to Tech Specs modifying reporting tt
notification requirements
Virginia Electric d Pouer Co 02/10/Oi Spp 15787 S2B
Fit JIB 50-2SO. BZ/10/06, 0210200043
24X
2I027O29B Ac k receipt of B20919 application requestlnj relief from
certain post-repair tst requirements of ASME codt Class III
fee requested since review involves consideration of tingle
safety i"
OlOOSjft H Licenee Fee Management Branch B2/10/19 LEA8BURO, R H,
Virginia Electric b Pouer Co lp 19636-329 S4X
F(ch 30-280, 82/10/13.B21027029B
aaiooioaas Foruard* IE insp R* P t* so-aao/B2-o4 t< g
BSOI29-02S&. Enforcement action *nb separately an QSOBIO
O'REILLY.J.P flsoion 2, Office, of Director- 82/03/13
LEASBURO.R, H. Virginia Electric b Pouar CD. Spp 13574, 32O,
Fiche 90-2BO, 82/07/29, B20a2e>0424.
24 X
0210010343 IE InP Bept* 90-850/82-04 t> 90-aHl/B2-O4 on B201K3-02H6
Noncompllance noted failure to maintain operabill ty af iteam
flow instrumentation *< to folloui QA manual ii procedure* for
documenting Inoperable steam Cloy tni trumentation.
BURKE, D J , DAVIB.M J . DANCE rH C Division of Project I. fleaident
Proorams. aa/04/09- 9pp. 19374.382 24X Fiche 30-SBOr 82/07/39-
B20B2&0424.
B210O70007 Respond* to FOIA request; for eight categories uf records re
steam genirator* ti iteam turbine*. App A documents provided
in R Ude.Il FOIA Request 81-313 Forward* documents licted In
Anp B
FEUTON,J M Division of Rule* and .Records.. B2/08/1O. LONO^ D J
MlDthrop r Stlntom Putnam i Robert* 9pp. 1S64S.O43 34 X
Fihe. 80-000. 82/08/10,8210070007.
8210070139 Forward* tabulated data on iteam generator imp & maint at
facilities Data should bi provided to licaniei*
IPPOLITD, T, Operating Reactor* Aie*sment Branch. B2/04/OL
VAROA, 8 Operating Reactor*. Branch 1 9pp. 15649 131 34X
Fiehe;SO-000,aa/08/10, 8210070007.
84
DOCKETED ITEMS
8210070173 Forwards info re itean generator Integrity i Inipi at all
operating PWR*,p*r 730320 k 21 requeitl Detail) of inipi,
including defect indita ttanti tub* plugging criteria b tube*
plugged ui I 1 not be provided ectpt -for Point Beach I
ODLLR,R R Diviilon of Reactor Litensinc INEIR-1979 only)
73/031*34 MflCCWIYiR R Divillon of Technical Revltui (NHR-1975
only) 5pfl 1S64S IfA S4X Fiche 50-000,62/09/10,5210070007
8210150139 LER 91-Q29/Q3L-0 on 810808. uih i le at 100V pouir, i ndiv idui
rod poeition indicator for rod F 12 indicated erratu*Hgi fc
IS ttepi !* than bank demand position Cauted by poor
electrical connection between coil 1 1 1 gna I module
HILGQN, J L Virginia Electric Si Power Co 0I/QS/3B flifign I
Philadelphia, Office of the Director (B1/03/OII app 13698 3C9
24X Flcn 50-280.91/09/28,0210150139
9310010156 Ack receipt of 920020 retpon*ei r emergency prepareiineis
deficiency itro* p tr 820*06 con f Irroat 1 on of action 1 tr
Corrective action b plant will an am mint [I during
lublenJent inpt
LEWlff.R C Civilian of Project t Ruidint Program* BS/09/10
LEHSBUSO.R H Virginia Electric & Poutr Co lp 15SA5 325 34X
Flthe 50-260, B2/09/1O, 62100101 So
0310130427 Faru*r<S "Imervic* Inp Pron.ram, 1 nterval 3^ B 2 1 222-9 2 1 323 "
R*!ief re^ueited from ASME Cpde.Siction XI teiting & imp
r-nuiremt n t
LEA3BURO.R H Virgin!* Electric 1 Pouer CD B2/09/21 DENTDN.H R
Dffce of Muclear Ructor Regulation. Director EISENHUT.D
Oiviilon oP Llctntjng lp 13677 152 24 X Fiche 30-3BO, B2/09/2I ,
8210130427
--321013043k "Iniervico Imp Prognm, Interval S. 621323-921582 "
Virginia Electric fc Poutr Co S2/09/SI 432pp 13iT? 193
24X Fichs: 30-280, 32/09/21,0210130487
B2I02702IS Formard* LERs 01-069/03L. 01-073/03L-0 t, ei-072/O3L~0
WIL30H.vJ L tfirginia Electric J. Pouitr Co 01/12/07 D'REIH- f J
Region 5, Atlanta, Office of the Director (Bl/03/01) |p
15B27 04? 24X Ficha 3O-S00. Bl /12/07, 8210270312
B210270215 LER B1-069/03L-0 on 91 1 1 15, d iscovered lou of ilau Ur
BK-OV'1O1 tt 103 procaii vent monitor* Cauied by radiation
monitor lampli pump circuit breaker tripping Came nut
dotrmined Breaker nsat fc pump started
WILSON, J L Virginia Electric b Pouior Co Bl/12/07 Kif.ti
ftllanta. Of fie* of the Director (81/O3/01) 3pp 1&O37 041
Fitfte 30-280,81/12/07,0210270212
B310270E2O LER B1-073/03L-0 on 91 1 10S, motor aperated valv*
to open uihan operated from control room during tetting
Cauta undttermlned Valve opened normallg uhen testd later
HILSOM.J L Virginia Electric (. Power Co 01/13/07 P*ij
Atlanta, Office of tha Director (01/O3/011 2pp 19Q37 O'A
Fiche 50-B00,ai/ia/07,B3l0270ai3
&2L02S03-31 FOTUartfl IE Intp Rept* 50-2SO/B3-2S t 30-291/02-35 on
B20830-0903 No noncorap I lane* notied
DfiNCE.H C Oiviiion of Project tc Ratidinl Programi 82/10/04
LEASJJUHO.R H Virginia Electric & Poutr Co 3pp 13774 375. 34X
Ficlie 50-280, 02/10/04. B210S20331
BE 10220356 IE Imp Rpt* SO-2SO/BB-2S S< 50-231/82-25 on 820930-0903 No
noncotnp 1 i anc* noted M*jor araae inipectvd FollouiUp on
fTfviaut nforcemant mat tin & unTi*olv*iI Itimt tt follouup
an unplanned rcleaie of gateoui Tad ioecti vltij
HOSEV.C , BARR.H P Divlilan of Enginierlng E> TtcJinlcal
Program* 92/09/3O lOpp 15776 277 4X Fiche:5O-BBO.BB/10/O4,
8210290331.
6210120110 Foruardt paijnint of requisite technical reviiu feai For
IniirvlcF imp b tEiting praerarn
LEA3BURO, R H Virginia Electric fc Pouer Co B2/10/09 DEKTON, H tt
Office if Nuclear Raattor Regulation, Director VAFOA, S A
Oparatfng Reactori Branch 1 tp 15*51 290 34X
Fich 50-290,92/10/03,8310120110
-9210270324 LEF1 B1-073/03L-0 on 01 1 108, i tolat ion valve to redrtul,
Ipray HX A failed to close Cause undetermined Valve operated
normally later Limit *ultch I> torque tattings eiamknad B,
found catl ifottonj
WIL80H, J L Virginia Electric Si Power Co SI/12/07 fttiiti
Atlanta, Office of the Director (SI/03/01) 2pp 19027 049 ,
Ftch 50-380, Bl/12/07, 3310270213
8210050103 Foruardi LER 93-OH4/03L-0
WILSON, J L Viroinifl Electric & Power Co 03/07/34
fl*9ion 2r Office of Director lp 15603 392 34X
Flche 50-280,83/09/34,8210050103
6310050109 LER fl2-OBt,/03L-0 on B30087, radia tion monitor FlH-LU-i:
Indicated 9 OE4 CPU u/o annunciation of alarm Cauitrf kif
defective puih button b setpqint djrlft Puen button replallf
ti nc-nitor rec*)ibr
H1L.SOH.J L Viroinia Electric Power Co 82/09/24 Rigii
Of fie. of Director 2pf> 13603 393 24X FichB 50-200, 02/09;
6210050103
920Q19-0233 IE Info Notice 90-39, Suppt 1, "Leading 1> DUlodged 1-129
Implant Sitdi " Sve lit encl.
COBB,L, I Qiviiion of Fuel Faceiitiai, Hatertalt & Safeguard^
03/10/Oj, Ganiolidated Ed i tan Co of MeUJ York iipp, 19741 250
24X FichB 50-000, B2/10-/06, B30B190233
Q20B19023B IE Bulletin 32-03, "3tn*i Corrosion Cracking in Thick-
Hall, Laruf-Di mutter ,St*Jnl tn Steel. Reclrcu 1 ation BUI
Piping at BUR Planti " Bvt Hit end
DEYOUNO.ft C Director'! Dffic, Office of Tnepectlon and
Enforcement. 93/10/14 Conolld*td Ediion Co of Niu Yort,
HSpp. 15810 125. R4X Fich* 80-000,82/10/14,8203190333
&21003007J Foruardl LEII 82-003/03L-0 (< updated LEfi 02-034/01 S-l
HJLSONrJ L Virjinia Electric b Pouer Co 82/09/27 CPflFH-Li
fi.flion S, Office of Director lp, 1 3603 175 24X
Fiih 30-280, a2/09/27,B21005007l
-B210050074 tER ea-083/03L-0 on 030831, performance of PT-UTE TI.I
that amp reading -for heat tracing panel 9i circuit 2H.uii
beloiii acceptance criteria Caused bij eicelilve h*at llsat
tracing replaced '* teitid
WILSON, J L Virginia Electric !< Pouir Co 02/09/27 IML'
Offic* of Director 2pp 15603 176 24X Flch* 50-360.
B3100S0071
S. RpdTt*hle o ccumncaai 1_ERi It related correspondence
3210150093 LEft 81-022/03L-0 on B10703, low floy alarm obitrved for
procn v*nt tijt Cauead bij proceii- blauiir mo tort out of ivc
du> to valve l-CM-2.1 leaking through to y-nt piping during
attempt to drain nixvd betf daminerali ler 1A for rein flit
WILSON, J L. Vlrglnl* Elictric tt Pouer Co 81/07/31 Res [on S,
ctor 3pp 15701 192 24JC Flche 50-890,81/07/31.
-8210030078 Updated LER 83-OB4/Q1X-I on Q20B08. venting lit A
pump retulted in max initantanooui releaie rate btltrg
eice-vded Cauied bij failure to change radiation monitor
tetpolnt alarmi to reflect neu vent tgi flow rat*(
WILSQH, L Virginia EUctrit & Pouer Co, 82/09/27
Office of Dirictor Spp 15603 178 34X Fichg 5O-3DO,
6210000071
321005009) Foruardi LERi B2-093/03L-0, 03-054/03L-0 t 133-092/0-X-3
WILSOH.J L Virginia Electric & Pou.r Co 83/09/27 O'REILLY.
Riglnn 2. Office of Director lp 15604 344, 34X
Fich*. 50-890. 93/09/37,8210050081.
eaioosooat, LER sa-cra/osi-o an 820904, at loox pomn-*ir tint i'
ffl*r}enc-y dieiel ganerator 1 found u/lneuff icient air
pr>-ieure to itart generator Cauied bi| failure to reitl lecil
low air prenur* Bottle* filled to 200 pit
WILBOHrJL Virginia Electric b Pouivr Co 82/09/27 Rip'
Office of Direct-or 2np IS 604 249, 84 K Fithe, 90-afl0 1 BJ/W'
eaioosooai
92100B0091 LER B3-054/03L-0 on 830905, unattended portablt (.
to clean wattrbox C iiuung around fr flooded ivc u-afcer pit
containing ivc water Valve MOV~SW-203B grounded In opan
petition Cauid bg operator error MPV-BW-S02B dried
WILSON- JL, Virginia Electric t< Power Co 02/09/27
Office of Director 3pp 1B604 247 24X Ficht aO-SBO.e
0210050061.
DOCKETED ITEMS
--B31Q050092 LER B2-092/03L-0 on 820905, at full power, DPI F-9 observed
fluctuating up to 13 steps Caused bij enposure of containment
ilde electrical panetraiion to eicesBive moisture & faulty
signal Steam leak repaired
WILSON, J L Virginia Electric J" Power Co 02/09/27 Region S,
Office c-f Director Spp 13604 350 34X Flche 50-380,83/09/27.
S210220413 LER S2-099/03L-0 an 880920, radiation monitoi-* RJ-OH-1O1 t
102.VQ-1Q3 4 104 & RM-LW-IOB lost power for 1C minutes
Caused bij blown supply fus due to Inadvertent hortinj of
control relag ' ground Fuse replaced
WILSON. J L Virginia Electric & Powar Co B2/IO/O3 Region S,
Office of Dincior 2pp 1577? 218 H4X Ficne 90-200,33/10/09.
8210320392
621O06O361 Forwards LERa 8S-OB7/03L-0 t. 02-057/03L-O
HfLSDH. J L Virginia Electric & Power Co B3/09/30 O'HEILLV, J P
ftegion S, Office of Director lp 15619 006 24X
.Fichu- 50-280,82/09/30,6210060361
B31Q06Q372 LER 82-OB7/O3L-0 on B20901 fc 20, pump t-SW-P-lOA aiperienroil
loss of sucliun power li on 830901,14 fc 20, pump 1-SW-P-IOA
insufficient NPSH Svc water replaced Svc water pumps vented
WILSON, J L Virginia Electric & Powor Co 82/O9/30 Region B.
Office of Director 3pp 15619007 34X Fiche 50-200. B2/O9/30,
32IO06O361
B210290267 Part 21 deficiencg rep t re potential galling problem between
stem & bonnet of 1 25-inch b larger A1O5 carbon steel I.
A182-F22 valves supplied Feb 1981-Auo 1932 Valves should be
serviced b item ti/or bonnet replaced
ISABELLE.L D Convfll, Inc B2/1O/11 HAYNE8. B C Raglan 1, Office
of Director 17pp I5B54 232 31 X Fiche 50-003,82/10/11,
03 10270267
8210220099 Forward* LERs 82-098/03L-0 tt B2-OS3/03L-0
UILSONiJ L Virginia Electric J. Power Co 82/1O/14
Region 2. Office of Director lp 13773 177 24X
Fiche 50-BBO, H2/10/14. B210220095
Q'HEILLY, J P
-B210060393 LER 92-Q57/03L-O on B209O1 , 13, IB & 30, pump 2-BW-P-1QA
eiperienced loss of suction pressure ( on 830913 & 14, pump
2-SW-P-1OB eiperlenced similar loss of suction Caused bij
insufficient NPSH Sue mater reduced Svc water pump vented
WILSON, J L Virginia Electric ( Power Co B2/O9/30 Region 2,
Office of Director 3pp 15619 O1O 24X Fiche SO-2BO, B2/O9/GO,
ea- 10060361
--B310220097 LER B2-099/03L-0 on S30919, 1 io.ui d waste monitor RM-LW-10B
alarm setpoint eiceeiled Tech Spaci limit during pprformance
of PT-26 1 Caused b(j defective log rate board. Defec tivt
parti replaced 1 meter calibr
WILSON, J L Virginia Electric l< Power Co 82/10/14 Raglan 3,
Office of Director 2pp 15779 178 24X Fichu 50-280, B2/ 10/14,
8210330095
21013020-1 Forwards LEHa 82-OS5/O3L-0, B2-O96/03L-0 t B2-095/03L-Q
UltSOIJ. J L Virginia Electric '. Poucr Co 82/10/04 O'REILLY.J P
fieijion 3, Office of Director lp I567S 29B 21X
Fittif 50-230.83/10/04,0210130204
-B210130208 LER B3-055/03L-0 on B20906, charg ing pump auxiliary oil pump
A tripped loading to tripping of replacement pump/motor
Auiiliarg pump failure caused bi( open winding in motor
Rep iac-ement tripping caused bi| undersneil thermal overloads
USLSDN.J L Virginia Electric fr Power Co B2/1Q/O4 Region 2,
Office of Director 3pp 15673 259 21 X Fiche 50-2BO. B2/ 1 0/04,
B210I3O3O4
B210220100 LER B3-033/03L-0 on 820914 , pomp 2-8U-P-10A lost auction
pressure Caused tg Inauf fie lent NPSH due to throttled ivc
mater Eo air conditioning Chilian Pump vented to restore
NPSH
WILSON, J L Virginia Electric b Power Co, B2/10/14 Region 9,
Office of Director 3pp 1377H ISO 24X Fiche 30-290,82/10/14.
B210220095
8210270264 Forwards LERs 8S-100/03L-0, BH-1O2/03L-O t> 0B-103/03L-0
WILSaN-J L Virginia Electric b Pouier Co 32/10/32 O'REILLY.J P
Region 2, Office of Director lp 1 3B53 1SB 24X
FichB 50-2BO, 02/10/22, 821029026-1
-d2101302l3 LER B2-096/03L-0 an B20916, w/unl t at 99H power.PT-37C
r-e/ealed that amp readings for heat tracing Panel 9, circuit
1*7. mas belou acceptance criteria Caused bij eicessive heat
Defective- heat tracing replaced (' tested
WCLSON, J L Virginia Electric 6 Poiuer Co 82/10/04 Region I
Offbce of Director 2pp 1967S 361 34 K Fiche 50-3BO, B3/ 1 0/04i
B210I3O204
-8210390270 LER BB-100/03L-0 on 820922, pump 1-BWP-10B bacamr all-bound
during U>B of air to clear sensing linss to uiater itrainert
In delta P gaugit Cautad by injecting air into svc uater
lines upstream of pump Personnel re initruc ted
WILSON, J L Virginia Electric ( P truer Co 03/10/22 Re-gion 2,
Office of Director 3pp 15893 129, 24X Flche 90-280,93/10/32,
8210290364
-B21Q1302I6 LER a2-095/O3L-0 on B2091 1 , w/unl t at full power, steam
generator C level indicntian LI-1-495 drifted high Caused by
bodg-bonnet leak on transmitter ref leg root valve Repairs
mil t> performed during ncit outage
HILSON, J L Virginia Electric It Power Co B2/IO/04 Region 2,
Office of Director 2pp 15679 363 JMX Fiche SO-2SO, 82/ 10/04i
9210130304
-0210290276 LER B2-102/03L-0 on B2O923, disc o versd pin attaching anubber
1-8HP-HBB-35B to main itiam line partially out & snubbeT
eacktd Caused undetermined Snubber stralgh tened fe pins
properlg Installed
UIUSDN.J L Virginia Electric h Poiuer CD B3/10/S3 Raglan 3,
Office of Director 2pp 15853 131 24 X Flche 90-380, B2/ 10/BB,
B3 1 0290264
0230130SOO Fcruartfs LER B2-09I/03L-0
IJIC.SD.-J, J L Virginia Electric (, po
Region 2, Office of Director lp
Fiche 50-2BO, Ba/10/01, 8210130500
jer Co 62/10/04
136B2 136 24 X
O'BEILLV, J P
8210130507 LER B2-091/03L-0 on 820905, water fc sediment found in lube
oil Of charging pump 1-CH-P-1A Caused bij leak in one tub* of
lube oil cooler Cooler replaced, oil changed & pump returned
to svc
WIL50N, J L Virginia Electric (- Pouer Co B2/10/07 Region 2,
Office of Director 2pp 15682 1B7 34 X Fiche 5Q-CBO, B2/ 10/04,
02 1 01 30900
-S2102902B2 LER 83-103/03L-0 on 830927, amp readings for he.at tracing
panel 3 circuit Z4D found btlou acceptance level Cauia
untcnouin Defective heat tracing replaced ti devign change
initiated
WILSON, J L Virginia Electric t. Power Co B2/10/S2 Region 31,
Office nf Director 2pp 13833. 133 34X Flch 9O-280, 02/ 10/23.
8210390264,
DOCKET 50-381 SURRY POUER STATION, UNIT 2
F Security, medical, emergency h fire protection plans
02102=0392 Forwards updated LER BO-019/03X-1 & LERi 82-058/03L-0 b
S3-O99/03L-0
WIt-BQM, J L Virninia Electric i Power Co 82/10/OH O'REILLV.J P
Region 3, Office of Director lp 15779 312 24X
Ficho 50-?BO. Ba/10/03, 8210320393
a21O2303'?B Updated t-ER BQ-019/Q3X-1 on 80030-V. error discovered in vol
of contaminated drain tanks for increasing tankage Caused by
or rone out labeling Vols relabeled S< other tanks evaluated
for use in liquid waste release calculations
WILSON, J L Virginia Electric t> Power Co B2/10/OB Region 2,
Office of Director 3pp 15779 313 24X Flche 50-3BO. B2/ 10/OB,
BS 1 0230372
B2IO23040S LEB 82-OSB/03L-0 on B20913, saf etu injection accumulator C
round u/i-edueed boron concentration of 1. 924 ppm Caused b
leakage through check valve 5-31-144 during sensitlied pipe
Flush Flush stopped Valve to be reworked during outage
HELSDN.J L Virginia Electric fr Pouer Co 82/1O/OB Region 2,
Office c-f Director 2pp 15779 216 24X Fiche 90-2BO, 82/ 10/Ofl,
B2 10220392
B210010156 Ack receipt ot B3QB20 responsHi r* mrgeneij preparedness
deflcitncg ittmi per 820406 confirmation of action Itr
Corrective action It plans will be tiamined during
subsequent imps,
LEWIS, R C Division of Project b Resident Program B2/O7/10
LEASBURO.fi H. Virginia Electric t. POWBF Co lp (3563 325 34X
Fiche 50-580. 82/09/10. B210010156
Forwards revised security training & nullification plans
Plans uilthheld
LEASBUflO.R.H Virginia Electric tt Pow>r Co. B3/09/17. DENTOM, H R
Offico of Nuclear Reactor Rigulatiom Director VAHOA, B A
Operating Reactors Branch 1 lp, 13366- t>l 3 24 X
Fiche 90-000,02/09/17,8310010123
B2 10030076 Submits correction tc B3O62B Reviiion 3 to reiponte to
NUREO-0737, Item I.D 2, "Safety P*rametar Dltplay Bus. "
Correction should be Included in *chedular exception*
pertaining to emergencg response capabllltlei
LEASBURO.R H. Virginia Electric fc Powar Co. H2/09/29 DENT ON, H R
Office of Nuclear Reactor Regulation, Director, EIBEWHUT, O
Diviiion of Licensing lp 19603 183 24 X Fleh* 5O-000, SS/09/S9,
BS 10030076
DOCKETED ITEMS
831021QOSQ Rlaaii public vriion at changei to mergincy plan
imp Itncnt i no procedure
FELTOM, J H Division at Rulei and Record* 92/09/27 Document
Management Branch lp 1S774 109 24X Fiche 30-200.82/09/29.
esioatooso
8210210033 Forward* public vnion of Change 1 to Emergency Plan
Implimentino, Procedurt EPIP-4 11. "Follouiup Offite Fltttaie
Aimiment. " Chin ft a 2 to rmergiiuu plan rt NUREQ-0654
cron-ref U Chanjn 3 modifying Table 5 1
BEHAtlDEL. P Virginia Electric i Pouer Co 83/09/17 HC - No
Dttailed Affiliation Oivan lp I37T4 110 24X
Fith. SO-2BO.8/0'?/29.aaiOaiOOSO
821O21005S Public veiion at Changi 1 to Emirjencij Plan Imp 1 men ting
Procedure EpIP-4 II. "Fullouup Qffiitt Rileate Ail mmxit "
ViT(inia Electric S< Pouer Co 93/09/17 2pp 13774 111 24X
, B21Q21Q050
B21021O05B Public version of Changtt 2 t, 3 to m*rjencij pl*n re
NUREQ-0634 cro*t-raf t. Tat.Se 5 I, "Kin Shift Manning
Requirement*! " raapee 1 1 vly
* Virginia Electric 1 Powar Co SB/OT/17 lOpp 15774.113 24
Fiche. 5Q-2BQ.82/09/a'?ia2l02100SO
P Operating licence stage document*!" corrHipotiienci
S210-ISQ2AS Inform* of iflpln*ntation itJttui of WUREO-0737. !tm II H 2,
"Plant Shielding" per NRC 620517 requeit All required uori
completed
t-EASDURO.R H Virlinia Elaetric t Pouer Co B2/10/OI BEWTON, H ft
Office of Nuclear Roactor Regulation. Dinttnr EISENHUT.DQ
Divilion of Licenilng Spa 1S691 230 S4X Fit hi 90-000:98/10/01,
B21012Q265
a2101202-?7 Foruarili srtflta to Topical Rept VEP-FRD-33. "VEPCO Reattor
COT* Thermal-Hydraulic Anln*i Uinn CQBRA IIIe/HIT
C<nnput*r Code "
LEA8EURO.R H Virginia Electric b Power Co 83/10/04 DENT ON . H Ft
Office at Nuclear Reactor regulation. Director ElESfJKUT, D Q
Dlviiion of Licencing 2pp 13t52 330 B4X Fiehe 50-000. B2/10/04,
92 10 120297
S2101Z0305 Errat* to "VEPCO Reactor Core Thermal Hydraulic Analysis
Utlnn CODflA-IIlc/MIT Computer Code "
Vtr^tnia Electric b F 9 ouier CD VEP-FRD-33 ERR 3S/IO/01 lp
1S652 332 S4X Flch> 90-000.62/10/04,6810120297
8210200043 Application for antnd to Lictniti DPF-32 & DPR-37 consistlnc,
of prepnced c hang** to Tech Gpeci modifying njnirHrij ^
natlficntion requlromenti.
LEftSBCRO.R.H Virginia EUctrlc (. Pouer Co B2/JO/06 DENTOM.H R
Office of Nuckaar Reactor FtaouUtton. Qirctar VAfiBA, S A
Operating Rtacton Branch 1 3pp, 15757 285 E4X
Ficht 50-230. 83/10/06.6210200043
BE 1020004 a Ppoptd chinjut to Ttth Bptti modlfijtng reporting fc
notification re<|utTn>nti
* ViTgtnla Electric b Poutr Co 82/10/06 3po 15797 ?2B B^K
FitPiB 50-260, fla/lO/06i 9210200043
6310220178 Comment* or* evaluation of aiinificant dypiamlc Ic-adi In
daterntnlng capacity o* illngt uuil pr NUREO-0612 Rallnc-
can b iafttv tisirtfid In ti-rnt of m it* tic load
LEASBURO.R H Virginia Electric . Pouer Co BE/10/1G DGHTONi H R
Or-ftc* of MucleJir Reactor Dcgulatlom Director ElfiENHUTi D
Diviilon of Lictoeins- Zpp 19777,293, S4X Flchl SO-OOO.B2/10/1B,
02 10220 17B
S2102BOaA6i In*ormi that conbticiaint ("urg valvo qualif IcabSon program
for 36-Inch containmi-nt purga vlv cniplted To inur*
pravantion of radioactlv* rUata,n*u automatic liolatlon
valve will tt Initilled.
LeASBUSO.F.K WiTjinta Eltctrit t> Poutr Co 88/10/33, DENTON^H R,
Office of Kutlerr Raactor flijuUtlor, Director. VAROA.S A
Qperatinu RtactOTi Branch 1 2pp 15B37.3IA, 2*X
B21O2B013O Infarnn that Tev(u of nu ful conttn.r Uftlna rig
cc-mpletd, Rig dttei not comply u/Parigraph 3. a 1 1 of
ANSI H14 6-1978 PropDied ileilgn moi for cerformance btins
revlNuid &ulll b Inplrnented bu 940323
LEABBUROrH.H Vlfalnla EUctrlc fc Pow r Co BS/IUSS
affle* of Nuclear Reactor R*gulatloni Dlractor, EISENHUT.D
Lle * B * 1 '** l(l - "MMAS, S4K
Ini-pection rfportir IE Bulletins
B2100B0019 Addl response to FOIA requeil for it Categnrjei
nucleaf reactor *venti ft tafttij problem* Foruiardi doiune
lilted In App A Document* in App D complitalij uithheN i
FQIA Eiempt ion S)
FELTQN, J M DivUlon af Rule* and Records B2/07/|a
Critical Man En*rjg Project 9pp 15tA5 027 34):
Fiche 50-000, 02/07/12,031006001 S
UMIL J
B210Q901S4 Sy*ttmtic assesiment of licintce prf orrrmnc. not.)
facility evaluation for Han 1979-Apr 1930
* NRC - No Detailed Affiliation Qwn 80/04/30 hoc
15668 OS! 24X Fiche 50-000. S2/O7/ 13. 831008001-1
n-i''i
B20B2&0424 AcV receipt of util B 2 0609 Itr t< pugmunt of eiu |i
Qaiad on rvl BUI of lncldsntl.no bail* for remiiolcn or
mitigation of pentltg ide.ntifled
LtEBGRMAN, J Enforcement Staff 83/07/39 UAttEURD.FI H
Electric 4 Power Co 3pp I3S74 313 24X Flch* ao EHO (J
920BB60424
Rion to NRC BHOStO Itr r vioUtion* nottjj In ] '-
Rpt 50-260/83-30 Corrsctiv* actions ptustflrtop ch(k|,l
will be p-erformsd by initrument luparvnor t nil imploum
<;ounild ri procadui-al compliance
LEASBHRO, R H Virginia EUctrlc t Pougr Co EIU/Oh^09
DEVOUNO.R C Dlmctor'i Office, Offic> of IntptcUorn irt
Enfornment 4pp 13S74 316 24X Ficlie 30-SHO.
0210010239 FnrUHrdi IE ln*p Hop t 50-280/88-04 t, SO JIII/H3 Cl
S20 123-0226 Enforcement action lent upai-uttlij on
O'REtLLV.J P Region H, Office of Director
LEA8BURO.R H Virginia Electric fc Pouir Co
Fltha 50-230,88/07/37. Q20B260424
Bt0010B4& IE ln*p Ropti 5O-2BQ/fl2-04 (, a
Noncotnp 1 Iflnci noted failure to maintain optrabl 1 i ty f tim
flow in tru mm tat Ion & to follow Oft manual b pracedurti | t >
documenting Inoptrabli (team flow Initrumentallan
QUHKE.D J , DAV1B.M J , DANCC.H C nivliidn of Prnirn l l
Program B2/04/OB 9pp 13574 323 B4K Tuhi 90-.1..1 !-J.
6210070007 Retpondl to FOIA requett for light cflttgoMit #, rt
itum 9nTitori b itaam turblnet App A document! jitn.utt
In R Udell FOIA Rqueit 81-313 Foruiai-d documinti iHUt in
App D
FELTOM, J, M Divition of Rulti ontf Records oa/0[)/10 ui'ri
Hlnthrop. Btimiqn. Putnam t> Rohertt 9pp 19M3 Qht Sti
Fjchr' 30-000- aa/OB/10, 8210070007
8210070137 Forward! tabulated data on *toam g>i)rit'>r tci^ fc
facllitdi Data ihould be provided to llctniti*
IPPDLITO.T Operating Reactori Anenmunt Dranih f* B VC,t
VAHOA.8 Optratlng Reactor* Branch 1 9pn Ifliil i^i
FUki 80-000, B2/OB/10, 8PI0070007
8310070175 Forward* info r itwam generator iriligrily 1 )-!)>
operating PHRirper 7S03SO fc 81 requett Ditallt <M iri,,
InclUiJing defect Indication!, tolie plugging crlUri* k L.tn
pltiogid ulll not be provided except fot Point On,t, j
OOLLEB.K.R. DivUlon of Reactor Licencing (Nfln -IV'S *-i.i
79/03/24 MftCCARY.R R Dlvltion of T#chn(e*l JJ(vlr <MM
onlgl, Spp 13645 196 24K Fiche 90-000.
Ack receipt of B20B20 ritponiei re traty >*i-ii
deflciancg Item per 8204Q6 confirmation of action || r
Corrective action h plin* ulll be eiamlned JurLns
iubi*quent Intpi,
UEHIBi R C Divitlon of Project fc Retldent PrcBnai 6j."jp, t
LEASBU-RO.R.H Virolnia Electric t, Power Co 1 B I9.-*S A.J" *
Fletie,!)0-2BO, 62/09/10,8310010156
aaioazoaat Forwrij IE intp R.pti so-aao/Ba-as i. M iiuitg s
saoasO-O'POa No noncompliance noted
DANCE.W.C, Dtvtion of Project I. Reildent Proii...t fer^.
LEAB8URC, RH Virginia Electric k Power Co Bpp i !>?*
Flehe 30-290,82/10/04.6210320331
-- -a21Q2203B. IE Imp Reptt 30-280/82-25 b 90-30W8J ai s^.
noncompllanct noted Major araa* fnipecttiT follow,,! in
p-viou enforcement matter* fc unretolved Il4*i !
an unplanned rela*t of gaieou* radioactlvily
HDSEYrC M , BAHRiK P Dlvl.lon of Cnglniirlna I *i 4 i,L,..i
Proarami B2/09/30 lOpp 1877* 277 3K Fl,
8310220331.
DOCKETED ITEMS
87
IE Infn Notice 00-35, Suppl I, "Leaking t Dislodged 1-125
IipLant Stall " Svc Hit end
fTDBB.t. I Division of Fuel Facilities, Materials fc Safeguards
lC/Ot Consolidated Edison Co of Naur York 66pp 15761 S5O
Fithe 30-000,82/10/06.0300190233
IE Bulletin S2-03. "Stress Corrosion Cracking in Thick-
Iftal 1, Large-Di ameter. Stainless Steel . Hue ircu lation Syt
piping at DWR Planti " Svc Hit end
0EYCUNG. R C Director'! Office, Office of Inspoction and
enforcement B2/10/14 Consolidated Edison CD of NEU York
JlBpp 1S010 IBS 24* Fichu 50-000,92/10/14.8200190238
8210130204 Forwards LERs B2-O55/O3L-Oj a2-D96/03L-Q t B2-095/03L-0
WILEDN.J L Virginia Electric fc Potu.r Co 63/10/04 O'REILLV.J P
Raglan S, Office of Director lp 15675 299 E4X
Fiche 50-230,82/10/04,9210130201
8210130203 LER 0B-Q95/03L-0 on 020906, charg Ing pump auxiliary oil pumb
A trlppBd leading to tripping of roplacoment pump /mo tor
Auilllarg pump fallur* caused by opn winding in motor
Flip lac (mint tripping caused) by under* lied thermal overload's
UILSON, J L Virginia Electric & Pouier Co B2/IO/04 Region S,
Office of Director 2pp. 15679:299 24 X Flch* BO-SBO, 02/10/04,
3210130304,
Re-portable occurrences. LERs d related correspondence
1O15O359 LER 91-013/03L-0 on 810719, c ontainment spray chemical
addition tani (CAT) level found below Tech Specs Caused by
leahiitig valve MOV-CS-2Q2B Valve scheduled for repair during
rent outage Tank level restored
nrLEQ/J.J L Virginia Electric & Pouier Co 01/08/17 .Region 2,
Atlanta, Office of the Director (BI/03/01) 2pp 19704 315 34X
Fiche- 50-291, 81/OB/17, B310150359
10370212 Forwards LERs B1-069/03L, B1-073/03L-0 8, 81-072/03L-0
WILSON. J L Virginia Electric & Power Co 81/12/07 O'flEILLY, J P
Region 2> Atlanta, Office of the Director (81/03/01) lp
15S27 O42 34X Fiche 50-300,01/12/07,8210270312
a21Q27O220 LEB B1-072/03L-0 on BI 1109, motor operated valve 2069B failod
to open uhtn operated from control room during testing
Cause undetermined Valve opened normally when tested later
WILSON, J L Virginia Electric t> Pouer Co 01/13/07 Region S,
Atlanta, Office of the Director (01 /03/OI t 2pp 15827 046 24X
Fiche 50-280>B1/12/07,8210270212
eaiQ27Q234 LER 8I-073/03L-Q on 81 1 109, Isola tion valve to rec Ircula tion
spray MX A failed to close Cause undetermined Valve operated
normal lij later Limit switch ti torque settings eiamined &
found satisfac tory
HILSQN, J L Virginia Electric d Pouer Co 81/13/07 Region 3.
Atlanta, Office of the Director (81/03/01) Spp 15327 O4 8 S4X
Fiche 50-200.01/12/07,8210270312
?IOGBOO15 Mil response to FOIA request for 19 categories of info re
nuclear reactor events & safety problems Forwards documents
listed in App A Documents in Ap p D completely withheld (ref
FOIA Exemption 5)
.FELTOU. J n Division of Rules and Records 82/07/12 UDELL, II A
Critical Mass Energy Project 9pp 13665 027 24X
Ficho 50-000,82/07/12,0210000015
-B2-D412O4B7 Discusses problems u/uiater in Fuel oil tank Case dona not
have generic implications
TREHAN.M K. Director's Office 82/04/06 MICHELSON, C,
Director's Office Spp 13665 036 24 X Fiche 90-000.02/07/13,
B210OB0Q1S
-B2Q51B0693 Forward* engineering evaluation of 8201 IB lots of rBsarvo
station, svc transformer B
TFtEHAN.N K Director's Office 82/09/10 MICHELSON.C
Director's Office 2pp 196 66 007 24X Fiche 50-000.02/07/12.
ea iocs ooi 3
3JOO5OOBI Foruiards LERa B2-093/03L-0, B2-094/03L-0 t. 82-092/03L-O
H1LEDH. J L Virginia Electric t Pouer Co 82/09/27 O'REJLLY.J.P
Region 2-, Office of Director lp 15604 244, 24X
FicfiB 50-230,82/09/27,9210050081
-B21OO50091 LER 8S-O54/03L-0 on B2090B, unatt ended portable pump In USD
to clean uatirbox C suung around b flooded svc utater pit
containing svc mater Valve MOV-8U-202B grounded in open
pgiltion Ceuied bij operator error MOV-BW-202B dried
HlLSOIt. J.L Virginia Electric t> Pouer Co 02/09/37 Region S,
Office of Director Spp 1 S404 347 24X Fiche' SO-280, 83/09/27.
821O0500B1
aiOOfc03Al Forwards LER B2-OB7/031.-0 (, 82-Q37/03L-0
WtL&OH.J L, Viroinie Electric k Pouier Co B2/09/30 O'REILLY- J P,
Region 2, Office of Director lp 15619' 006 24X
FicAs- 80-280, 82/09/30,8310060361
-B21GOA0396 LER S2-057/03L-0 on 820901,13,18 t 20. pump 2-SU-p-lOA
experienced loss of suction pressure & an B2Q913 It 14, pump
2-SU-P-10B eiperiinced similar lo of suction Caused by
insufficient NP8H Svc uater reduced Svc water pump vented,
WfLBDH, J L Virginia Electric & Pouer Co 82/09/30 Region 2,
Offlca of Director 3pp ISilf 010, 24X Fiche 50-2BO. B2/O9/30,
B31DS20434 ForuaTdt LER SS-Q5b/Q3t--Q.
WIL60H.J L Virginia Elsctrlc t< Pouiep Co 9B/10/O7
Region 2, Office of Director lp. 15773:270 24X
Fiche BQ-291. 83/10/07, B210S20424
O'REILLY, J P
B210S20435 LER a3-05c./03L~O on 920907. praii ure in nitrog.n bottle
supplying emergency air to PCV-MB-20SA & B discovered
belou limit Caused bij leaking nitrogen bottle connection
Replacement bottle correctly inttalledl.
HILSDN.J L Virginia Electric fc Pocur Co B2/10/O7 Raolon S,
Office of Director. Bpp 1577B 271 24 X Fiche; SO-28U 93/ 10/07.
8210220424
8210220392 Foruiat-di updated LER 60-019/OGX-l t, LER I S2-03a/O3L-0 b
B2-099/03L-0
MIL8DN.J.L Virginia Electric i. Pomei- Co 82/10/O8 O'REILLY.JP
Rejion 2, Office of Director lp 1S779 212 24 X
Fiche 50-280, aS/10/oe,fl2!02203?S
--8210220408 LEB 02-098/03L-0- on 030915, safety in J action accumulator C
found u/reduced boron concentration of 1.924 ppm, Caused 6(j
Leakage through check valve 2-SI-144 during itniitind pipe
flush Flush itopped Valve to be reworked during outage
WILSON, J L Virginia Electric t, Pouvr CD 93/10/08 Region S,
Office of Director 3pp 19779 216 24X Fiche 30-230,02/10/00,
6210220372
0210290367 Part Bl deficiency rept rt potential galling probUm betiuean
item t* bonnet or 1 23-Inch & larger A105 carbon steel It
A1B2-F22 valves supplied Feb 1781-Aug 1 7B2 Valves should be
serviced ! *t*m ti/or bonnet replaced
[HABELLE, LD Conval, Inc 62/10/11 HAVNEB.R.C Region 1, Off ICE
of Director 17pp 1SB54 333 24 X Fiche, 50-000. B2/10/11.
9210S902&7
B210320099 Foru.rds LER B2-098/03L-Q t B2-OS3/03L-0
MILBON, J, L Virginia Electric & Pouer Co 02/10/14.
Region 2, Office at Director. lj> 15776-177. 24X
Flch* 30-SBO.B2/10/14,S2102B009S
O'REILLY, J
LER S2-053/031--0;on Bao914-oump 2-8U-P--10A lost suction
pressure Caused bij Irsuf f ic lent MPBH dua to throttled ivc
uiater to air conditioning Chilian, Pump vented to restore
MPBH
WILSON- J,L Virginia Electric (- Pouer Co. B3/1O/14 Region 3,
Office of Director 3pp. 13778:180 24X Fiche 50-2SO.B3/10/14.
831022O099
DOCKET 30-203 PRAIBIE IBLAND NUCLEAR STATION, UNIT 1
F, Security, medical, nergBncv d flr-a protBttion plant-
0810250200 Forwards ictnarlo outline for 821014 emergency, plan
evaluation eieirelse, per NRC 920112 guidance Itr,
MARD.E C Northern SHUs Power Co B2/09/01 RBginn 3. Offico
of Director Spp 1S73B 277. 54X Fie he, BO-SB2, 8S/O9/O1, 031 02DQ20O
8210040345 Forwards IE Imp Rpt 90-202/82-19 & 90-306/92-19 on
B20B24-23 No nontomp tiance noted 1
PAPERIELLQiC J Division of Enargencu Prapar*dne*i h Dparatlonal
Support 92/O9/10 LARSOMiC, E, Northern States fouer Co Bpp,
19993 396 S4X Flehe: 90-262, B2/09/ 10. 821OO40349
--B210040354 IE, Insp Rsptl SO-S8S/G2-I9 & 30-306/82-15 on 820B24-29 No
noncampllance noted. Major *r*ai Inspected, previou*
deficianciis in prompt notification/warning igi.
PATTERSON. J.P , AXELSON. M L Division of Efflirgencu PriparadnCB 1.
Operational Support S2/09/G9. 4pp. 19993.398, S4X
6210030184 Forward.* rsviiefi Pag* 4 refl*cting NRC guLdanca on
activation of public alert & notification sgs,re 321014
etnvrgsncij plan e>ercise
WARD, EC. Northern States Pouvr Co. S2/O9/3B AXELSON.HL Ragion
3. Office) of Director, Spp. 13640:173 E4X Fiehs- 30-262, BZ/09/Sa,
82I00801B4
88
DOCKETED ITEMS
6210120339 Notification of 631001 minting u/ 1 icaniBe. BNL i Engineering,
Planning & Kg t. tnc in Bethesda.MD to diicust request* -for
exemption from 10CFR3Q.App R requirBments r tlrf
DIIANNI.D- C Operating Reactors Branch 3 B2/O?/2S CLAflK. R A
Operating Reactor! Branch 3 2pp I5&72346 24X
Fiche 30-282,82/09/29, 9210IS05B9
B2I0070172 Forward! info re steam generator integrity 4 nilpi at
operating PUR s, per 75O32O t, 21 request* Details of inijit,
Including defect ind icati ons, tube plugging criteria li tuhn
plugged ui 1 1 not be provided eicupt for Point Beach 1
GOLLER.K R Division of Reactor Licensing (NflR-1975 onlvl
73/03/24 MACCAR,R R Division of Technical Rnvlaw CURIJ-lflM
null/* 5p-p 15645 196 24X Fiche 50-000, B2/08/10,MIOO?000?
32IO26037A Ask receipt of FEKA 8SOS2A 1 tr re evaluation at offsite
Biixfrgencv preparedness For facility eiercise & associated
final oercise evaluation* Offute emergency preparedness
deficiencies should be addressed ty util
HIND-J A Division of Ennrjencij Preparedness & Operational Support
32/10/21 GILBERTS, D E Northern States Pomar Co 2pp 15604 001
Z4X Fiche 30-202. 62/10/2 1, 8210240374
3210270262 Forwards info clarifginj B2Q63Qrept. "Fire Protection Safe
Shutrfoun Analysis in CompllancB H/10CFR90, App R, Section
III t> Substantivi Dam for Sumption Req.uostB. " per
321001 meeting u/NRC
HUSGL-F,D Northern State* Pauier Co B2/IO/82 Office of Nuclear
Reactor Regulation, Director 132pp 15B29 049 SAX
Flche 50-262, 82/10/23, 8210270262
5 Qperatino Itcunse stage document! t correspondents
3210040123 Bubmtts supplemental info ra utll B20614 VBn.ust for amend
fco C-Uvn9>9 DPR-43 f. DPR~iO "LOCA ECCS Limit Ing Preal i.
Eiposure Sensitivity Analysis for EMC XN-1 6 XM-H Reload* at
Prairie Island I " applies to both Unite I (. 2
MUSDt-F,D Wopthrn State* Pouer Co 82/09/24 Office of Nuclear
Reactor Regulation, Director fp IB 581 203 24X
Fiche 30-263. 62/07/24, 9510010123
9210040345 Forward* IE Insp Ropts 50-232/63-15 fc
820S24-35 Nn noncomp 1 lance noted
PAPE^rELLO.C J Division of Emergoncu Preparedness & Optr*li = -S
Support 82/09'/10 LARBC1N,C E Northern States Pnuier Co 2}l
135?3 396 21X Fiche SO-S82, B2/09/10, H210040343
--8H10040354 IE Insp flapts 50-362/83-15 t. SO-306/Q2-15 on flJOM 1 -; ^ k,
nonenmp 1 1 ante notad Major areas inspected previoui
ijf i c ienc IB s in prompt noti f L call on/uarni ng sijs
PATTERSOW, J P , AXELSON.WL Division of Emorgeticij F'ripjrtdrrn i
Operational Support Q2/09/09 4pp 15993 35) B4*
Flche 50-232,82/09/10,8210040345
Hng 1 l>]tlodard T-IJ!
B20BI0233 IE Info Notice BO-35, Buppl 1,
Imp U tit &eds " Svc list ent 1
COD8.L I Division of Fuel Facilities, Materials t. fiaf
B2/IO/O& Consolidated Edison Co of New York ttiff
24X Fich 50-000-82/10/06.0200190233
&2SOI'Ju432 Ack receipt of 820915 HP informing NRL at !tpi it
cornet violations noted in IE Insp Hepts 30-232/02-11 1
50-3C-6/B2-I1
SPESSARD.R U Division of Project & Residont Program
LAREQ-W, C E Horthern States Power Co Ip 13741 103 1MJC
Fiche SO-28E. H2/IO/07, 0210190432
&2100S0319 Forujiriii raaponie to Core Performance Branch 830816 concerns
ro method* of monitoring core pouer d 1 itribut ioni for
Cycle 7 operation
MUSOLF, D Northern States Pawn- Co B3/09/29 Office at Njclcar
Reactor Regulation. Director 13pp 15610 2i9 24X
Fich 50-202,82/09/29.8210050319
8210130-360 Dlicuiies imp!* nentatl on of HHC guidelines for marking
hour*, provided in. Qeneric Ltr 82-12 Revised guideline! have
been Imp 1 i4Htsted. u/eicBp tioni of 72- h per ul limitation &
relief from control board dutlei.
HUSOUF, D Northern SUtai Pomer Co B2/10/07 Office of Nuclear
Reactor Regulation, Director 2pp 1567i 012 24X
Fich* 50-000, 82/10/07, B2IOI302AO
8210190139 Refunds to NRC 320317 Itr re violations not id In It |-
f)pts 50-2B2/e2-lI !. 50-304/92-11 Corrective actiani
ttartup program changed tn normalize flui diffarent*
channel a
LARSQNjC E Northorn States Power Co B2/09/1S 3IIH frH A , J F
Division of Project (. Resident Programo 3pp 1S74I IEH 3Jlr
Fiche 50-292, 82/10/07,8310190432
J*ck receipt of G2092B Itr Informino NRC gf ttipt 4lin tt
correct violations noted in IE Imp Reptu 50-^03/03-13 t
50-30i./a2-13
STREETER, J F Division of Project b Resident i'rograin* (1SMO./CJ
LrtBBON, C Northern States I'ouier Co Ip IS/04 3hl Hi
Fiche 50-332.62/10/00,9210130249
8210190422 Foruiardi "Analytii of Capsule P From Mar thorn St*tB POUOT
Co Prairie Island Unit 1 Realtor Veiifrl Radl*tion
Burvflillance Proarara "
HUSOLFrD Hortliern States Poutr Co. 82/10/12 Office of Nuclear
Hactor Regulation. Director, Ip I S741 044 24X
Fich, 50-292, aa/10/12, BS1019042S
82IO19Q429 "Analusi^ af Caplule P From Northern State* Pouer Co
Prairie Island Unit 1 Reactor Ven-el Radiation Surveillance
Program "
YANICtma, 8 E , TRnNiK C , KAISERiH T Ueltinghout* EUctrlc Corp
HCAP-IQIOH 8B/03/31 fiBpp IS741 045 24X
Fiche-50;-EB2, B2/10/1 2, 8210190422
a2tOISQ23& Reipondi to NRC 020903 Itr re violatloni nnltd in It E
Repti 90-2B2/Q2-I3 t< 50-30A/GS-13 Corrsctlvc uctioni dlllll
generator test procedures mil bo i ovi*ed bif D212QL b
investigative rtpt will be discussed u/operatan
LARSON, C E Northern States Pousr Co 02/09/20 himiltt. f r
Oivlsior. of Project & Residnnt Programs Ppp, ID/Ot ;)A2 ,il
Flche SO-2BB, 52/10/08. 02101S0249
B21O2S0164 Foruiards IE Insp Hepts SO-2HS/B2-16 fc SO-DOk/u.' IA 0"
B20701-I7 d notice of violation
BTfiEETER,J F Diviiion of Project S. Resident Program IM'IC'U
LAR&DN'C E Northern States Pouer Co 3pp 19D.1/ 111 III
Fich*, 50-232. Q2/ 10/13, 0210280164
BE 1 02601 S 4 Advlte.1 that mods rquir*d bij NUREO-tt737, I ten 111 D 3 4,
"Control Room Habl tability. " will not be completed until
83031 S due to dalayi in receipt of matt & s4npling
equipment
MUSOLF. D Northern State* Pouer Co 82/10/82 Office of Nuclear
Reactor Simulation, Director 3pp 19797.012 S4X
Fiche: S-0-2B2, aa/10/22. 821O260154
Inspection report*' IE Bulletins & correspondence
-8210280168 Notice of violation from imp on 020901 -17
STHEETER, J F Division of Project b Resident Projrini
Ip 1SB37 201 24X Fiche 30-232.02/10/13,02102(10144
B21oaa0171 IE Insp flepts 50-2B2/B2-16 . 30-306/B2-IA on
Hc-ncomp 1 ian ce noted failure to post no smoking lign In
taFetv-rela ted nuipment areas ti operators found trtiokln
D-UBRY. H, E. , REYEB,L Division of Project & Heifdertt rr
B2/10/13 kpf 1B037 2O2 24X FUhe 50-282. B2/10V 11,
DJJI: .1
e210070007 Responds to FOIA rtijuest for eight categories o rcord* re
steam generator* !c steam turbines App A dDcun*nts jrovided
In R Udell FQlfi R>q.uet 61-313 Foruards document) listed in
App B
FEL.TDM, J.H Diviiion of Rules and Rfrcords. B2/08/1O LONO, D J
WintJiropi 8tlm*cn- Putnam (< Robirti. 9pf 13445,043 24X
Fiche 50-000, S2/GB/10 r 8210X170007
3306190336 IE DulKtin 62-03, "Stress Corrosion Cruel Ing in Hut-
Mai I, Large-Di Brno tir, Stainless Stesl, Rocirculalion By*
Piping at BUR Plants " Svc list end
DeVOHJNO.R C. Director's Office. Office of Inspection in*
Enforcement. 82/10/14 Consolidated Edison Co of H Yari
ItSpp 15B10.129 34X Fiche 50-000,33/10/14,0300190339
8210O70I39 Foru*rd> tabulated dat* on ittan genirator imp ) malnt at
facilities, Data thould lie provlditf to Uciniees
IPPDL.ITO,T uperatlng Reactor* ntiannent BraneJi 82/04/01
VAFiOArB Operfrttng R*4ctori Branch I 3pp. 19643:131 24X
FichB-30-OOOj
S Rport*t-l occurrences, LEIU t rnlabd correiponilince
8B1O1S03B1 Foruardi LER 81-011/01T-0
HAVER.L Q Northern States Pouer Co B1/OB/B4 KEPI>LEft,J
Rtfflon 3, Chicago, Office of the Director (81/03/01) Lf
19704:063 24X Fiche 50-BS2, SI /OB/24, B210150381
DOCKETED ITEMS
89
--6210130390 LER Bl-01 1/O1T-0
B10Q12.D2 rfiesol generator tripped I.
lac ed out during operabilitij test Caused by generator
ape at ing in unfamiliar mode & vflr & uiatt meters being
con used by operator
HUK TAD. A A Northern States Power Co 81/08/24 R
egian 3.
CM ago, Office of the Director (B1/03/O1) 2pp 15704066 24X
Fie e 30-2B2,Bl/OB/24,a21015Q3Bl
E31O130510 Foruartfs LER Ba-O16/03L-O
I1UEOLF. D Northern States Pouev Cn S2/10/06 Region
3- Office
ol Director Ip 15iB2 256 24X Fiche 50-282,82/10/06,
0310130510
--32IQ13Q533 LEfl 83-016/03L-0 on 930906, spike occurred in HCB activity
up to I 3a uCi/0 dose equivalent I-I31 Caused bij reactor
trip { iiioienuent uashout of fission product from e*istin0
fuel defects Region 7 fuel will be removed
HUNSTAD.A ft Northern States Pomcr Co B2/10/Oei Region 3,
Office of Director fipp 15682 257 24X Fiche 50-282. B2/ lO/Oi,
8210130510
6210250179 Forwards LER B2-019/O3L-0
nljgOLF, D Northern States Power Co 62/1O/15 Region 3. OFfite
of Director Ip 1S7BB 296 24X Fichu 50-282,02/10/15,0210230179
P Operating licence stage documents i corres.pondonc e
5210010008 Responds to FOIA request for 19 ca togur-ios. of documents re
nuclear reactor event* S, safety problems Forwards documents
listed in App A
FELTOWr J M Divinon of Rules and Records 83/06/23 UfiELL-jfl A
Critical Mass Energy Project 19pp 15727 005 24X
Fiche 30-000, B2/06/aB. B21001000S
8004100193 Forwards evaluation of fatility for Cycle 6 operation All
Tech Spec changes ti safety analijjcs required for 1300 MVI
approved
CHECK, P S Reactor Safety Branch 00/03/18 REID, fl W Of or at ing
Fleactors Branch 4 (Pre BO042B ) 34pp 1 57H7 Oil 21X
Fiche 30-000, 82/Oi/26,a21CK>100oa
B210OS0015 Addl response to FDIA req.ueit for 19 categori us of info re
nuclear reactor events i safety problaras Forwards documents
lilted in App A Documents In Ap p Q complntelg withheld (ref
FOIA Eiemption 5)
FELTON. J H Dlviion of Rules and Records 02/07/12 UDELL , Ft A
Critical Ma*s Energy Project <?pp 15669 O27 24X
Fiche 30-000. SS/07/12, B210O6001 5
S210250IQ3 LER 82-019/03L~0 on S20')17. d lese 1 cooling ualer pump 3H did
not start on demand during testing Start attempt 7 minutes
later successful Cause unknown In 5 day a of tes t ing ( f ai lure
could not be reproduced
HUUSTAQ.AA Northern States Pouer Co 83/10/15 Region 3,
Office of Djrector Ip 157BB 297 SIX Fiche 50-382,02/10/19,
BZI025O179
02102503-44 Forwards LGR Bd-019/03U-0
MUSDLF. D- Northern States Power Co 63/10/15 Region 3, Office
of Director Ip 15790 177 21X Fiche 50-3B2, B2/ 10/ 15, 8ai02D0364
a2!025037i LER Ba-OtB/03t.-0 on 52091 5, d iscovered that two ventilation
flOLJ tests not performed as scheduled Caused by personnel
error Tests rescheduled
HU'NSTAD.A A Northern States Pouier Co B2/10/1S Region 3,
Office of Director Ip 15790 178 24X Ftche SO-HQa, S2/1 OJ 1 9.
0210250364
DOCKET 50-285 FDRT CALHOUN STATION. UNIT 1
A Application/construction stage documents (< corraspondance
Responds to FOIA request for 19 categories of documents ri
nuclear reactor events & safety problems Forward ( documents
Usted in Apo A
FELTOM. J M Division of Rulei and Records 62/06/38 UDELL, H A
Critical Mass Energy Project 15pp 15727 005 24X
Fichu 50-000,82/06/38,8210010000
8105040512 DlicuiSBi actions proposed us reiult of boric acid
corrosion damage of stud bolts & piping at PWfl plants IE
proposal ti schedule for actions mill be discussed at B1040?
maatlng in Bethesda.HD
ENIEZEK.J If. Division of Resident & Regional Roactor Inspection
81/04/02 EI8ENHUT.B Division of Licensing ARLOTTQ. ff A
Division of Engineering Standards 3pp 1566B 127 24X
Fiche SO-OOO, 02/07/12, B2 lOOSOOIS
6210050247 Foru-ai-ds poat-acc i oent sampling BIJ 5 status update t<
revised completion schedule per NIJREQ-O737.. Item II S 3
Reason* for delay of TMI action p iJin mod discusaod
JONEB.M C Omaha Public Pouier District B2/09/30 CLARK. B A
Operating Reactors Branch 3 3pp 15610 330 24 X
FichB 30-205, B2/09/30, 0210050347
8210060176 Advi sei of delay in receipt of motor curvet from vendor
per Q2Q521 commitment to provide justification re adequacy
nf electrical distribution sys voltaguo. Curves t, evaluation
scl>dulnd for lubmittal by B31201
JONEB.M C Omaha Public Pouier District 33/10/01 CLAI1K.H A
Operating Reactors Branch 3 Ip 15614 OO9 34X
Fiche 50-235, 82/10/01, B2100&OI76
821O290038 Forwards PNL final rep t an 020600-10 audit of pracsdurifs
training addressing prasiurii ed thermal ihnck Issue Hoi (<
min subcoolinu margin curve, NOT fc saturation curves should
be available on single plot in control room
CLARK- R A Operating Reactors Branch 3 82/1O/I2 JONES, W C
Omaha Public Pouier District 3pp 1 5077 H7O 24X
Fiche 50-285, BH/10/12, B210E9O03B
-- 8204270046' Recommends prompt attention be given to problem of reactor
coolant pump closure stud corrosion detected at facjlltios
Response by B20415 requested
EISEHHt/r.D Division of Licensing 82/O3/24 HANAUER, S. H
Division of Systems Integration (post B11005) 3pp 15745 H70
24Jf Ficlie 90-OOO,G2/Ofi/2B,921O01000S
8310270041 "Audit of Fort Calhoun Proceduros 8< Training that Address
PresiuriieiT Tharmal Shock Iue, " final ropt
CLARK, R . rtMEB.K , RANK1M, H D Qabtelle Memorial Inotituta.
Pacific Northuiiit Laboratory 85/06/30 3Spp 15877 531 K4X
FUho 50-235,82/10/12,8210290039
Security, medical, Bmergencij Jj fire protection plans
02 i
f
Forwards site security plan Revision 11 Revision withhold
tref 1OCFR73 21)
JOMES* H C Omaha Public Power District 02/08/27 DENTON. H R
Office of Nuclear Reactor Regulation, Director Ip 14710 097
Fiche 50-203,82/03/37.0209170051
631Q22O11Q Notifies of eniergcncy preparedness appraisal team B2110B
site visit to close out App a AID ite/ms identified in
IE Emergency Preparedness Appraisal Hept 30-383/62-27 on
S1I2O7-I6
SEJDLEj M C Division of Resident, Reactor Projec fc ti Engineer ing
Programs B2/10/17 JONES, W C Omaha Public Power District tp
1377S 163 24X Ftche 50-285,82/10/19,8210220110
H General correspondence
S21QG6O544 Requests that author be deleted from mailing list Further
mailings should be sent to Metropolitan Planning Agency
H1RSHEN.A H KirBhen, A H 82/07/30 TQURIQNY, E HRC - Nn
DatallB-d Affiliation Oiven lo 1SA19 320 S4K
Fichu 50-285,82/07/30,8210060244
90
DOCKETED ITEMS
3210190349 IE Imp Kept 30-295/03-17 on 620930-0903 Mo nDncom[.liar.e
noted Major areai inspected housekeepino/cleanl iriesii ontl te
review committee d callbr
MURPHV.M , FLIPPQ.T.A . KUNNKUTT. D M Division of Reiidenl.
Reactor Prajict h Engineiring Projrami 95/09/20 6pp
65742 114 Uf. rich. 50-393,82/09/22,6210190347
Forward* IE Imp a apt 50-285/82-16 on 820901-31 No
noncompl lance noted!
SEIDLE.U C Divitian of Resident, Reactor Project I. Engintenng
Programs 82/09/22 JOHES, H C Omaha Pub lie Pauer BUtrl c t Epp
15731 306 24X Fiche 50-285.82/09/22.8210190531
B3IOQS030I Foriuardi LER 83-017/O3L-0 Detailed event analysis tutBatci
JOHEStH C Omaha Public Poiusr District B2/1O/QI CLflFlK, P, A
Off ratim Reactor* Branch 3 |p 15610 261 24X
Fiche 50-2S9, 83/10/01,6210050301
B21Q050303 LER 82-017/03L-0 nn B2QB3Q, contr ol room operator n!li<ri
valve position indication (or Inboard containment delation
valve*, HCV-aaOB t B21D Caused 6y Valcor Engineering Co
solenoid valve* containing failed solenoid coili
CORE, MR Omaha Public Pouor District B2/O9/29 flepion4
Office of Dlraetor 4pp 15*10 2&2 24 X Fiche 50-2US, Ktt 10'Cl
B2 100 50301
6210190539 IE Imp Rapt 50-285/62-16 on 020601-31 No nont on.pl lanes
noted Hajor arias tnipi-ctad operational safety wan* itjtlon.
surveillance teBting-malnt, preparation for refueling 1 LER
/el louup
YANDEUL.L A i HUNNICUTT, D M Division oF Resident. R*actor Project
4 Engineering Programs B2/09/17 6pp 13751 30B 24K
Fichi 30-235,92/09/22,3210190531
3210070326 Ac k rtcipt df 920629 I tr aupp lamenting 911012 ti 0904 Itrs
informing MflC af fpi taken to corrtcC vlolatiant noted in
IE Inip Dept 50-293/61-16
BE I OLE. W C Dtvition o-f Retidint, Reactor Project t Englnccving
PTOjram* 62/IO/OS JONGB-H C Omahi Public Pouar Dlitrlct Ip
1Si34 OS 5 SAX Flcne 50-SBS, B?/10/OS, 9310070324
-8^10070333 Responds to NHC 610BOS Itr r* Violations natid in IE IriBp
Rapt 50-2a5/ai-Ii Cornctive *ctiorn *1 1 OA racordt uill be
entered into recorif ngt -141 bif 831231 [nfo updates Q10704 &
1012 ruponin
JONES, U C Onaha Public Pouin- District 62/06/29 8EIDLE, U C
Diviilon up ReildBnti Re-actor Project b Engineering Programs 2pp
15634 086 24X Flcha 50-395. 6S/10/05, B210070326
V Operator Eia mltntions
6210200077 Advisci that Util propased schedule for
0737. Item I A 1 3, "Shift Manning Requirements," hat bien
delaijed due to NfiC not having graded eiams for tuo Kniar
reactor opcratoT trainacs Meu completion date Is OJOJ01
JONEB.H C Omaha Public Pouier District SS/10/15 CLAflK, H
Operiting Reactors Branch 3 Zap 13759 354 SAX
Fiche 50-885, BS/ 10/15, 921020QO77
DOCKET 50-2fli IKBIAH POINT STATION, UNIT 3
F Security, medical, emergency (* fire protection plans
53100&0091 Submit! request for mods to emergency nuti f icat ion
to upcamino relocation of emergency facilities
DRO-MS, J C Pouer Author! tij &f the State of Neui Volt
SMITH. K Division of Emergency Preparedness & Opera 1 1 and I
2pp 13614 359 SIX Fiche 5O-2B6, B2/O9/ 1 3, B210060091
!20B190233 IE Info Notice BO-35, Supol l, "Leaking & Oil lodged 1-135
Implant Sesrfs '" Svc Hit ncl
C098.L ! Divnion o? Fu*l Facilities, Katrfali & Safeguard a
92/10/06 Consolidated Edison Co of Neu York Aipf> 15761 2110
24X FicKe 50-000. B2/ 10/06,92081 90233
BS10Q60H5 Fciruardi "Testing t, Repair of Siren Portion of Al
Ho tif lea tton By for Indian Point Nuclear POUJBT Oencrnitinj
Plant." p-er discussion at 9SO908 itatui meeting
KELLY. J J Power Authoritg of the State of Neui Vurl
DAVIDOFF, D Naw Vorki State of Ip I!t611 29S 24K
Ticfto 50-217, a2/09/I3,SZIOO6OMS
1203190338 IE Bulletin 82-03, "BtVBis Corrosion Cracking in TMck-
Hall, Large-Diameter, Stalnleit Stevl, Rec Irtu lation Sijs
Piping at BUR Plant* " Sv<; Hit end
DEVDUMQ.R C Director'* Offic*, Office of Inspection and
Enforcmnt B2/ 10/14 Consolldatgd Edison Co, of Hew Vork
HSpp 15B10 125 24X Fiche 50-000,82/10^14.8208170233,
Notifies of Bratrgency priparedneis apprelial team 621100
site visit to close out Appi A fc B item* identified in
IE Emerg*ncv Prtparidnlll Appraisal Rept 30-2B5/B2-27 on
BI1207-1A
6E1DLE.H C Division of Rasldent. Rtaetor Project fc Enginsnring
Programs B2/IO/19 JOMESj H C Omaha Public Power District Ip,
15778 16H 24X Fiehe 80-365,82/10/19,8210020110
P*rlodlt operatino reports ! r* la. ted eorre
210190736 Forwards monthly operating ript for Sept 1982
JONES, W C Omaha Public Power District. 82/10/12 DEVOUNO, R C
Director's Offlc, Office of Inipoction and Enforcement Ip
13736 S62 24* Fieh, 50-2B5, 62/10/12,62101 90736
-8210190746 Monthly operating rept for Sept i"?82
SHO.RT.R.IJ Omaha Pirbtic Pouer District B2/HJ/12 7jp
15736,263 24.X Ftche 50-285,93/10/12,8210190736
Reportable occurrence*, LER* t related correspondence
2100401B4, Foruerds UCR S2-01B/01T-0
JOWE8,W C Omaha Public Pcuir District, 92/09/20 SEIDLE.U C
Roion 4, Office of Director. Ip I95ai'3.52 34X
Ftche 50-283, 92/09/20, B2t004<HB6
-9210040187 LER B2-(Ha/01T-0 an 820917, r.vieu, pf l.clrd-nniumatic: (E/P)
valve positioners rev*aled absence of analu*i< or tatt
quiltf icatlon dat *ar Honiuuell Kndtl 67400-033
R F, Onaha Public Pousr District 93/09/17 Region 4,
Director. 4pp, 13581:333 24 X Fleha SO-3B5, 8S/09/20p
821006OMQ "Testing & Repair of Siren Portion of ftl&rl t,
Sy* for Inifian Point Nuclear Pomer Generating Plant "
Pouier Authnriti; nf the State of Neu Vorfc
I56I4 296 E4X Fiche 50-247,92/09/15.021006014^
8210130047 Notification of B20924 meeting ui/u U 1 In Bethittfa. PID ti
discuss App R Tevieu
THOMA. J Operating Reactor! Branch 1 Oa/09/20 UAF1GA. E A
Operating Reactors Branch I Bpp 15696 2S3 21K
Ficli* 50-2B6, B2/09/30. B21013O047
9310130604 Toruards Auiiliarij Bijt Drajich input to agenda -for E).?br.l
meeting in Be thasda, MO to discuss App R ti p robabillsl lc
risk aiseisment
VAHOA, 8 A Operating Reacto-r* Branch 1 62/09/21 LlNCiiMRiL h
Pouir Authorltij of the State of Neu York Gpp tSfil^ :i3l HI
Fich 50-2361 92/09/21,9210130604
e21C04020i Act receipt of 8E2Q902 Itr detcribing status nf *eli^Un
undiruiaij to -correct significant deficiencies identified by
FCHAi in response to NRC BEOB03 Itr
BrtlTHiO H Division of Emergency Preparedn*a i OpiroUaral k-)t
B2/09/27 BHONB, J C Poiuer Authority of the State OK tlia VcTt
Ip 1S&83 134, 24X Fiche 5O-2B6, 82/09/27, B3lQOtOSOh
B2L004081Q Forurds deicripti-on of activities pUnned or undiT..!,
correct deficlenciei listeif in FEMA B2O73O intrln flndirji
re adequacy of radioing ical emergency raaponsn proparidi^iii
of it at* % local govts, par HRC 620803 reqwbit
BAVKE, J. P Power Authority of the Statn of NBJ Vorl: ea/C9iiJ
HAYHE8, R C Region 1. Office of Director lip? I39&3J3J
Flth* 50-204,82/09/27. BSI0010S06
B210050079 Informs that imtallation of CRT terminal In emrrjinti
operations facilltg & video surveillance *<) * per THI Aclien
Item III-A 1 2 ulll be complateil bij end of current
refueling outage
BAVNEi J.P Power Authority of the State of New Vorl (33f<tttju
VARQArS.A Operating Fleacton Branch 1 2pp 15604 274 Hi
Flehe SO-SBo, 33/09/30, B210O50079.
210130570 Forward* I.ER 82-&17/03L-0
JONE8,H C Omahft PubUe Power Diftritt fi2/0/39 SFIDLE.W C
?i5-?K- S!:'tT ntl R " ctl>r Project t, En B initrtng Projra-M, Ip,
18479:109 B4X FichB-30-299, BS/09/S9, B210130570,
S210 190738 Forwards schedule for providing info requfitv-d In
Itr re App R
BAVNE.J P Pouer Authority at the State af New York
VAFWA.S.A Operating fiactor Branch 1 4pp 157J6 25B
Fiche SO-BBA, B2/10/12. B21019073B.
DOCKETED ITEMS
91
6210200019 Advises th
will not be correct
erious deficiencies in emergency preparo
ince State of HV t FEKA not
addressing concerns of local officials by involvement in
current changes
HOLT.J Public Interest Research Group, Neui York KESSLER.J
Rockland Cttuens for Safe Energy BCHEINER. C A Weatchester
People; Action Coal i tion. Inc 83/10/15 PALLADINO-N J .
ROBERTS, T M , AS5ELSTINE. J K Commissioners 5pp 13755 083
Fich 50-247. B2/1O/13,S2102O0019
B210300019 Advices that serious deficiencies in emergency prep are-dues
uilll not tie corrected since Stata of NV b FEMA not
addressing concerns of local official! bu Involvement In
current Chang ei
HOLT.J Public Interest Research Croup, NeuJ York POENER.P
Parents. Concerned About Indian Point FLEIEHER, Z S Unit Branch
Conservation Association 63/10/15 PALLADINO, N J , A HEAR ME, J F .
GILINBKY. V Commissioners 5p n 15755 083 24X
Flche 50-247, a2/10/lS,B21030001<?
Ad iud i c atorij correspondenc
BC.O!)53O7aa Acl receipt of 300416 memo u/insp rapls verifying interim
ac^iPtu required of Facilities in BOOS I i confirmatory
[ten E 5 in U Qammi 1 1 B00317 memo should be F 5
NOWW.T II Assistant Director ror Operating Reactors 80/06/13
ERYAN. S E Division of Reactor Operations Inspections lp
G2765 2B5 24X Flche 50-247, BO/06/O3, 8O062307BB
S31QQ60235 Declines invitation to appear before Subcommittee on
Energy Conservation It Power Subcommittee investigation Is
intrusion into ongoing regulatory proceeding d threatens
Lndepend erice of Commission
r-DHGAN.C Morgan Associa'es MOJJQAN, C Pouier Authorttg of the
State of Ncu York 03/09/30 OTTINGEFi.R L House of Rep . Energy
Ca-Terce lOpp 15619 360 24X Fiche 50-247.03/09/30,0310060335
8210040103 Order CLI-B2-2S, requos t ing ASLQ reconstituted by
CL [-62-24 to estimate when recommendations called for by
CLJ-B1-23 can be provided
CHJLK. S J Office of the Secretary of the Commission 82/10/01
Atomic Safety and Licensing Board Panel lp 1S5HO 350 24X
Fiche 50-217, 92/10/01, 9310040100
B21O2203B9 Submittal of comments on ABLB B210O1 memorandum t, order S-
motion for ASLB to issue reformulated contentions, on
Commission Questions 3 & 4 6y 331115 fc to restore
Contention 6 2 Certificate of Svi one 1
TOSOANIiK Parents Concerned About Indian Point 92/10/15
Atomic Safety and Licensing Board Panel 2pp 15777 307 24X
Fiche 30-247, 02/ 1O/15, B2I02203B9
8210210390 Requests destruction of West Branch Conservation Asioc
S31011 reply to B21001 memo! amJum ( order J. substitution of
end version
FLEJ9HER. I 3 West Branch Conservation Association 83/10/10
NfIC - No Detailed Affiliation Oivnn lp 1S764 099 24X
Flche SO-247, B2/ 10/ IB, B21O210370
B21O210397 Response to 331001 mcmnran ium t order Certificate, of Bvc
enc 1
FLEISHEHiZ S West Dranch Conservation Association 02/10/13
4pp I57A4 1OO 24X Fiche 50-247^ S2/1O/ IB, 821 0210370
0210300059 Response to ASLD 9210O1 ardor ASLB should narrow language
of ASLB Question 1 1 & adopt proposed schedule for
continuation of proceeding Certificate nf Svc enc 1
MOORE, J . HCOURREN.H J Hearing Branch 1 B2/1O/17 9pp
15757 290 24X Ficbs 50-B47, B2/ 1 O/ If, S210200059
SS10O5 | 3aS4 Memorandum t, order restating contentions & establishing
procedures based on Commission guidance
SLErtSQW. J P . PARIS, H , SHOW, F J Atomic Safety and Licensing
Hoard Panel B2/10/O1 ,12pp 15609 211 SAX Flche 50-347,
82/10/01, B2IQQ50254
6210130335 HoUnn for AELD la direct; NRC ta reschedule B21013 mectiliq
u/utils ( Sandia in Albuquernue. NH to either Now Yorli NV or
Washing ton. DC Intervenor unable to attend meeting In KM
LVEtSS.E R Union of Concerned Scientists WEISS, E R Public
[uterus!. Research Group, Neu York 82/10/07 Atomic Safety and
Licensing Doard Panel 3pp 1 56B2 05O 24X fiche 50-347,02/10/07,
--B21O130337 Motion for Commission to direct that all future meetings nn
liius-a tie held in MV or Wash Ing ton, DC t< that intervenors bo
glten notice concurrent ly ui/other parties
IJEI-B9. E H Union df Concerned Scientists UEI8S, E R Public
Interest Research Group. Neu York 02/10/07 Commission ers
2pp 15692 053 24X Fiche 50-247, H3/1O/O7, 8210130335
2L01B02O3 Reply to ASLD 321001 memorandum t> order Plant should be
totally reinspectad u/appropr la te tests of p i ping, e 1 ec tri cal
i. control tys conductod List of parties should be shortened
to active participants Certificate of Svc encl
FLEIEHERrZ S Uest Dranch Conservation Association B3/IO/1 1 4pp
L571S 13-1 21X Fiche 50-247,02/10/11,8210150303
6210150092 Order denijing UCS/NV PIRO 021007 motion to direct NRC to
reschedule 931013 meeting in Al buquerquB, NM to NY or
Uajli Ington, DC Only Conmi s si nn has jurisdiction over NRC
performance of administrative responsibilities
PARIS, H , SHON.F J . SLEASON, J P Atomic Safety and Licensing
Board Panel B2/IO/13 Union oi Concerned Scientists 3p p
137O1 191 24X Fiche 30-247,62/10/12,8210150092
BS 1032037 5 Request for mod of ASLD B210Q1 order, to permit Rockland
Counti) to continue pra'Sn tat ton nf ultnesse* re Commission
Ouistions 3 d 4 prior to taking evidence on Guvstioni liSiS,
6 t, 7
THORSEN,E Rockland County. HV 3S/IO/11 Atomic Bafety and
Licensing Doard Panel 2pp 15779 187 24X Fiche 5O-247r 82/1O/19,
0210220375
8310230410 Joint response of intervenors to AELD 831001 order Meaning
of "ducuBi i on" of probability should be clarified & ABLB
should immed lately reformulate contentions on Questions
3 4 fl Certificate of Svc end
WEISS. E R Union of CDncarnerf Scientists WEIS3, E R Harmon ft
Weiit BE/ Id/19 Atomic Safe-ty and Licensing Board Panel, IHpp
1S77S 313 24X Fiche 30-347,83/10/19,8310320410
Proposed hearing schedube, Certificate of Svc end
DRANDEWBURe, D Consol idateJ Ed 1 son Co of Neu Yard MORGAN, C
Pnuier Authority of the State of Neu York MORGAN, C Morgan
Associates 03/10/1? 9pp 19787 OA1 24X Flche 30-247,03/10/19,
B2102500B1
8310230216 Rtsponse to ASLB 021001 nrtfer ref ormulatinfl eonttntions
Opposes adnlaslon of neu Contention t 1, Con tentlons 2~l<al-
<d).2 aia) b 2 2(b) & ASLP Queition 3 S 1 Not ICE. of
appearance fc Certificate of Svc encl
MORGAN, C Pouer Authoritv of the State of NBUI York MORGAN, C
Morgan Associates 82/10/1? Atomic Safety and Licensing Gourd
Panel 35pp I57B9 166 24 X Ficlie 50-H17. 82/1O/1 9, 82102S0214
0210250265 Nafcica of appearance In proceeding
BAUMi S L Power Authority of the State of Nou Yorl
Morgan Associates B2/10/19 lp IS791 152 24X
Fiche 30-347,88/10/19. 0310350265
liAUM, S L
G51O15O141 Order scheduling 031103-04 prehearlng conference In White
Plain*. NY re oral argument on responses to ASLD 8S1001
memorandum fc older restating contentions
GLEASOM.J P Atomic Safety and Licensing Board Panel B2/10/12
2pp IBcWS 306 24X Fiche 50-247, 83/10/13. 8310150141
6210160130 Motion in response to ASLD 021001 order, req,uest ing
clarification & importance of term "discussion" & extension
of time to determine position re issue of consolidation
Certificate of Svc encl
KAPLAN.C Neui Yorfc.NV 83/10/13 Atomic Safety and Licensing
Boar* Panel 7ap 15719 123 24X Flche 50-347. 82/10/13, 8210180139
3210300069 Telegraphic order granting licensee request for extension of
lime to file responses to 821001 order All party responses
dut 821019
GLEASQN.J P Atomic Safety and Licensing Board Panel 82/10/1-1
Pojer Authority of the State of New York lp 15757 2BO 24X
Fiche 50-247-62/10/14,8210200069
8210290287 Motion for order mvursinj ASLB 821001 memorandum ti
order re taking of testimony on Questions 3 d 4 &
establishing schedule for prns e-nta tion of testimony upon
expiration of 120-day clod Certificate of Bvc encl
VGTEREr L A Uestchester Count i/ rN/ 02X10/19 Atomic Safety and
Licenslnj Board Panel 7pp 1 37-?! 163 24X FUn* 50-817,02/10/19,
8210250307
8310390324 Memorandum re ASLB 8H1OO1 order roformulating contention*
Objects ta neu Contention 1 1, Da-sea la & lb . Contention!
2 Ka>,2 l(b),2. Kc),S Hd),2 S<a) & 2 2(b > , Crt i t icate of
Svc incl
HRANDENDORO. B Commonuia 1th Eifison Co 02/10/1? Atomic Safety
and Licensing Board Panel 49pp. 15770 243 24X
Fiche 50-247, 0a/10/19r 02102303H4-
8210250099 Motion for leave to file memorandum In response to ASLB
021001 order 1 dy late Mechanical difficulties encountered
lit/ward processing equipment Certificate of Svc encl
BRANDENBURG. B Consolidated Edison Co of Neu York. 82/1O/2O.
Commisionen &pp 15707 Oc>2 24* Fie he 30-247,02/10/20,
8210350099
92
DOCKETED ITEMS
92102B0242 Request* Conuni ss IOTI issue order directing all meetings
between NSC t, licensee be, held in HashlnBton, DC or UY, that
intervennrs receive notice of meeting! concurrently u/utlls
4 that intervenors be provided ui/minute* of B21013 meeting
WEISS.E R Harmon 6 Melss UEISS.E fi Union at Concerned
Scientists 62/10/23 PALLAD-INO. N J . AHEARNG.d , QILiNSKY. V
Comi.1 si toners Sfy I SB37 OSB 24X Flche 30-247,92/10/35,
0210280243
9210280230 Advises tfiat NIC dots not intend to respond to intervsnor
motion* filed in response to ASLD 621001 oril*r until after
621103-04 prnhfjring conference
MOORE, J E Hearing Branch 1 BS/10V27, OLEASON. J P , SHOtl, F J ,
PARIS, H Atomic Safety *<"> Licensing Hoard Panel Ip 13037 083
H-1X Fiche 5O-247. BZI 1O/27. B2102B0230
G0090&D466 Forwards rasponso to 000620 request for status ript it
Zion/Indian Point task action plan Responsibilities ir Ln
arc' of severe accident mitigation features k not in inUrln
aperit ional actions portion
MEVEfl.J F Reactor Sustemi Branch BO/OB/25 NOVAK, T d Ai
Director *or Operating Reactors 2pp 03484 00? 24X
FieM 90-003.00/08/35,6009080466
6010150103 Discusses union representative allegation re htr< itsirii if
security guard personnel Addl info necessary prior to Fl/lC
Investigation of allegation!
WARD.H J Office of Inspection ! Enforcement, Office or t>
Director 30/09/28 Office of Inspection (< nf ore imir,! > Offn" Y
the Director 2pp 03630 260 24X PUbe 50-347. 6VCB/Sd.
B01C150103
8210*90353 Response opposing UCS/NY PIfiO 021012 motion to direct NBC to
reschedule all future meeting* on hearing issues in NV or
Washington, DC NRC hould b* permitted flexibility to
dettrmint most Appropriate location W/Certi f icat* of Svc
MCOURREN.H J Hearing Branch 1 B2/10/37 Cnunmf tilontrs 9pp
15839 04S 34X Flche 50-247, B2/10/27, B2102B0353
B2i0290371 Anvi s*s that Ucenieec plJin toadilrBsi all mafctir* raiied in
r(mnses/mot ion re ASLB 621001 nmnorindum fc order at
B21 103-04 prehearing conference
SRANDENBURO, B Consol ldat*if EiJiaon Co of HeuYork MDROAH, C
pcu*r Author! tu of the State at Nu Vort HDROAIJ, C Morgan
Anoclatei 62/10/27 OLEASOW. J P . SHOW, F J . FAfHS.O h 1 Atomic
Safety and Lioniing Board Panel 2pp 15333 012 SIX
Fiche 50-247. B2/10/27, 8210270271
8009250234 Submit* description of work being done on anal^tit ef
releatr* from facilities Simple 1-D mul tlcompartm B nt thirril
hydraulic cade being untten to analyie variety of FVCE
dsslgni Related dita encl
FENSTERMACHEH Seactor Systems n ranc h 80/09/10 BPEid.l P
Reactor Systems Branch 4pp 03SS9 2B7 24X Fiche 30 JiJ.aV
9009250234
BQ102S0234 Responds to B00917 request ra control room revliu WJC S
Itr detailed five adtfl items to near-term OL renu Irentnt i
Item 111 D 3 4 requires analysi* of control room
habitabilitu bu B10101
HOUSTON, H M Accident Evaluation Qrancn BO/09/23 VAROA, B A
Operating Racton Branch 1 Ip 03560 001 24X
PicliB 30-347. 00/09/25, 8010220234
H General correspondence
9210190713 Informs that S3 lullo ! HA Burns authorlieii to sign util
Itrt to MHC
BAVIJE.J P Pguer Authorltv of the State of MBUI Vort 62/10/10
Office of Nuclear R*actor Reoulalion, Director 2p(> IS733 209
SIX Fiche 50-000. 92/10/13, 8210190713
B210250272 Raquetti subatl tut ion of L Djum u/TR Freij on official ivc
li*fc for proceeding Ralated correspondanca
COLARULLI.P F Morgan Associates COLARULLI.P F Power Authority
of the State of Neu Vork 82/10/19 STUCHV. B W Docketing &
Service! Branch If 15791 190 24XFiche 5D-B47. B2/ 10/19.
B2102S0272
6010310793 Foruards recommendations for meeting auiillirij fod
min flow rquirements Licensee must demonstrate d*c*v f>t
re-no vi I for 10 minutes ui/o operator action or rei*t <on1rsl
valve throttled position
CHECK, P S Assistant Director for Plant BY it ems 00/0 '^iO
NOVAK, T H Assistant Director for Operating ReaeUri ijp
O3647 104 3At Fiche 50-247, BO/09/20, 00102 10703
6011110094 Requests Instrumentation & Control SYI Branch twiluit
util responses to questions re incore ins tr umentn 1 1 on lulu
at facilities Info mil aid branch evaluation mittgaUtui
features re backfitting of severe mitigation fciiturvi
SPEIS, T P Reactor Sustains Branch BO/10/09 GATTtRI III 0. R
tnstrumBntacion & Control Sgstims Branch Ip QS'J'^7 001 3*
Flche 50-247.00/10/09.0011110004
O Advisory Committt* on Reactor Safeguards reports !c corr*ip ondencp
B207 180077 Forwards tomnent) on PHA study dealing u/seismtc hacarri
Validity of conclusions rest on quality of primary data
tames & ailufflptlons in both studies Rept* arn not valid risk
assessments duo to data bat* limitations
POMEROY.P H RondOJt Associates B3/00/24 OKREHF, D ACRS -
Atfvtsorij ComnittBe on Reactor Safeguard* 7pn 15B7 001 24X
Fich> 90-206,82/08/24.8207180077
P Operating 1 i cen stage documents b corrBspondance
B007010A59 Qnvracins Raactor Event Htmo BD-7 ra nvarlij simul taneoLs
trips of Units 3 fc 3 Evint uas of negligible saf*tg
significant* b trips uere unrelated & coincidental
EISENHUT. D Division of Licensing SO/06/13 VOLLHER. B H
Division of Engineering MATTSDN, R J Dlvimton of Bafetij
TBclinDlogy. HANAUER.S H Dlviiion of Human Factors Safetg Bpp
02613 149 24X Fichu 50-247, BO/Oi/13, B007010638
60072803)2 Bummaru, af 800625 meeting u/util Te imp licaticn* of Clao-s 9
accidents on Hyatt pathuAua at facilltv
CODEC, L. R Hvdrolog-ic: & Q(ottcAnic4l Engineering Branch. BO/07/08
LEAR.O Hvdrolagic & 0o technical Engineering Branch 9pp
030 iA 253. 24X Fichu SO-247. 80/07/09, B0072803I2
8005050220 Requests LG Mjnh be permitted to continue reviewing
ovcrprv IIUTI protection sys b asiociatid Tech Bpecj
NOVAK, T Assistant Director for Operating Reactors 80/07/30.
ERNBT, M L Aislstant Dinctor for Technologij Revieu IP
03078. 175- 24X Flche, SO-247, BO/07/30,BOOS050220.
800B130741 Summary of B 004 17 meeting u/utiU In Bathesda.MD re
containment structural responie to core ne!t acci-dent
squnc*
MEVERiJ, F Pautf agstimi Branch BO/07/3J Po*r Suttins Branch
3pp 03ai6'S-13 24X Flche 30-247,80/07/31.80081307*4
3009100100 Forwards rBconmindatiani on staff tk action plan to be
ent to licensees for revleuft respc-nse.
BARRETTiL H, Operating Rlactors Asstisntnt BrancJi BO/OB/OS
Vfi9QHtG.fi Opritlng Reactor* Branch 1 <Prt Q0042B) Bff
03516 Oi4 S4X Fiche- 30-247, BO/OB/OSr8009100IOO.
60SO2B009B Foruards NRC questions t< util ansuars ri bathflll
sevire accident mitigation features Evaluation nstded In l
uli
SPEIS, T P Reactor Sustema Branch 00/10/17 BCKAULIt,*
Structural Engineering Branch Ip 69767 104 iMX
Fichi 50-247.00/10/17,8010200090
90112O0025 Foruardi Pouer Sus Branch evaluation of dUfirmm
Indian Point 2 ft 3, in response to technical assistance
request Requests meeting u/liceniee prior to formal rtlponis
to evaluation
CHECK, P B Assistant Director far Plant SusUm* OO/IQ/JJI
NDVAK.T Assistant Director for Operating Reactors ULftt
O3743 111 24X Fiche 30-247,00/10/21,801130002!!
B2IOO70007 Reaponifs to FOIA renuest for eight categarlei ol rttt'H
I tii in generators & steam turbines App A documents provUid
In R Udell FQIA Request 01-313 Forwards documents HttiJ irv
App B
FELTOM.J M Division of Rules and Records 02/OB/lO 1 W*8 t J
Uinthrop. Stimson. Putnam t< Roberts ?pp 19649 0&3 3*'
Fiche 30-000, 02/OB/lO, 0210070007
9210090452 Requests comments on draft Bandla "Ltr Rtpt on Rtvtmit
Evaluation of Indian Point Probabilistic Safetu Studv" b
821001 netting to discuss comments will be held apprai
621013 U/a end
VAROA.S A OperJiting Reactors Branch 1 82/09/13 BINCIM* 1.
Pourar Author itg of the State of New York 2pp 13656 81A i*t
Flche 9O-2B6. 82/0?/13,9210090432
8210040400 Notification of S20921 meeting u/utll in Oethtili.HO 1i
discuss p-ropased repair program for steam generator shell
THOMAtJ a Operatino Reactors Branch 1 82/Ov/lfi VAflO* B *
aperating- Reactors Branch 1 Ip 19S97 220 B4X
Fiche: SO-2B&, 02/09/16. B210040400
S2JO030534 Ra<(uests replg to BO 09 23 request for addl info n ***
program
VAROArS A Operating Reactors Branch 1 B2/07/2I 8IMCI*!* I h
Pfl.j.r Author! tg of the State of Neu York Epf> 13*34 M* W
Fiche SO-H86, S2/09/21, B2100S0934
DOCKETED ITEMS
021029030") Requests results of evaluation*, analyse! & detailed
ascription of any ongoing or planned Imp it plant d
schedule for repair to steam generator Results requested
ultPiin 30 dags of recelp* of Itr
EISENFWT.D O Division of Licensing 82/07/24 SINCLAIR. L W
Pouier- Authority of the State of New York 3pp 15876 244 H4X
Fieri* 50-296, 82/09/34,0210290203
62lOiaOOi3 Summary of 820921 meeting w/ut il. Westinghouse. C-E << BMI re
problem! u/steam generator tubes Utll proposed to sleeve
degraded tube; t, plug remaining tubes
Ui e-ugrapha e-ncl
ThOMA. J D Operating Reactors Branch I 82/09/20 Operating
fl*a;tors Branch 1 BOpp 15694 276 24X Fiche 50-286,03/09/33,
B21O13O063
Forwards responses to 02Q31S request for addl info, Items 1.
3,3 (. B re control of heavy loads, per B2042 1 commitment
Responses to items 5, 6 >j 7 le supplemental response to Item
3 will fee provided bij 821130
P Pocuer Authority of the State of New York 02/09/30
A Operating Reactors Branch 1 9pp 15614 111 24X
Fiche 50-2Q6: 82/09/30, a2lOOc.018t
e2JOI2O353 Foruards initial comments on Sandia Natl Labs BS0025
preliminary draft Itr rept on review 6 evaluation of
probabilistic lafetif s tudi;' addressing mind, sei imicr Fire,
pre-isur 1 1 ed thermal shock & fan coaler issues
EJ'TOCLE.J 1 D Consolidated Edison Co of New Vork DAVfJE, J P Pooler
Authority oF the Statfl of fjeu Vork 02/1O/06 VAROA, 3 A Operating
Reactors Branch 1 62pp 15652215 24X Fiche 50-247, 02/10/Od,
8210350253
SZIO150031 Foruards addl payment required for BSObOA application to
a.T.end Tech Specs re mg t organijation struc ture, per NRC
B3Q713 Itr Addl payment made under protect pending final
determination of legality of fee schedule
BJV.I-JE. J P Pomer Authority of the State of Nw Vork B2/10/00
MILLER. IJ a License Fee Management Branth 3pp 15701 S65 24X
Fie he 50-000. 82/10/00. 02101 B0t)31
8210070139 Forward* tabulated data an steam oenerator inp A matnt at
facilities Data ihould be provided to licensees
IPPQLITOrT Operating Reactor* At aesimein t Branch B2/04/01
VAROA, S Operating Reactor* Branch 1 5-pp 15649 131 24X
Fiche 30-000,82/00/10.8210070007
821007Q2U Forward* IE Insp Rapt 50-234/82-16 on 320014-0915 Ho
noneompliance noted
6TAROSTECKI,R Division oF ProjBtt & Resident Programs 62/09/33,
BRONB, J C Pouier Authority of the State of Neui York; 2pp
19634 246 2-5X Fiche 50-286* B2/O9/23. H21OO70S14
S21OO70216 IE Insp Rept SO-2at/S2-16 on 02O816-091 S Mo noneomp 1 i anc a
noted Major areas inspected plank operati onii plant tour.
surveillance, mainti purj Ing tt venting af tantainmenti test !i
ma*uramint equipment pragram
FDLEV, T . KENNV-T J , KISTER, H Dlvulon of Prajict tt R*iident
Prworams 82/09/S2 lOpp IH634 H4B 24X FJthe 50-BBA, BS/09/23,
8210070314
8210290203 Request* resulti of e yt I umti, on*, dnaly tat J< detiiltrf
deicriptlon of ing ongoing or ptannBt) imp & plans Si
ichdule for repair to itaarn ganeratoi- Result* rvqueited
within 30 dagi of receipt of Itr,
EISEMHUT, D fi Dlvliion of Llcniing 82/09/24 SINCLAIR, L. U
Pouir Authority of tha State of Ntu York. 3pp 15876 244 S4X
Fieh* 30"28i, 52/09/24,8210290203
8205190233 IE Info Notice 90-35, Suppl 1, "Leaking k Dislodged 1-129
Imp 1 ant B*di " eve lilt encl
CODH.L I Dlvltion of Fuel FacllitJe*, Materiali & Safaguard*
82/1 O/06 Goniolidated Edlion Co of New Vark &6pp 13761 250
24X Fiche 50-000, BH/lO/Oi, B20B1 9OS33
B20B190B38 IE Bulletin B2-03, "8tTs Corrosion Cracking In Thick-
Mail, Large -Dldmiteri0tainless Bteel.R (circulation 9ys
Piping at BUR Plants " Svc Hit enc 1
DEY-OUNO,Ft C Director'! Qffie*. Office of Inspection and
Enforcement 82/10/14 Consolidated Edlion Co of NBU Vork
115pp 15910 129 24X Fiche SO-000, S2/1O/ 14, 8208190236
Foruards info re NUREQ-0737, 1 tern II u 3, "Post-Ace id &nt
Eanpling Sgs, " par NRC 820630 Itr
J P Pouisr Authority of the State of New York B2/1Q/12
.S A Operating Reactors Branch 1 2pp 15736 272 2
Fiche 50-286.02/10/13,8210190720
"Response to 820630 NRC Info Request Concerning
Pos t-Accid-ent Sampling "
i Power Authority of the State of Meu York 02/10/31
1573i 27-1 24X Fiche 50-206,02/10/13,8310190720
Forwards request for addl info re TH! Item It K 3 25,
r to Furp Seals " Areas of confor/nance t> deviation
stated position should be identified Si info re design (<
tion of affected cooling sys provided
S rt Operating Reactors Branch I 02/10/13 SINCLAIR, L, W
Po.er Author, ty of the State of New York 3pp 15706 211 84X
Fit lie 30-286, B2/ 1 0/ 15, B21O2204S5
G3IO?10-159 Forwards application to amend License DPR -64 ti proposed
Tecfi Spec changes re steam generator surveillance
re-qu ir emetitf
BAVJVE, J P Power Authority of the State of Neu York 02/10/18
VAFtCA, S A Operating Reactors Branch 1 2pp 15768 236 24X
Fiche 50-2SA, 02/1O/1B, 8210210459
R Periodic operating reports & related correspondence
9210180088 ForuJn-di monthly opel-ating rapt for Sept 1982
BROWS, J C Pqunr Authority al the State or Meu Yart 92/09/13
Management Information Branch lp 15717 340 SIX
Fl cho. 50-286, B2/09/12, B210I BOOB3
8210160091 Monthly operating* t-ept tor Sept 1982
AUTERINO.L power Authority of tha Eta fee of Neu York BS/10/O1
6pp. 19719 341 24X Ftche 5O-2B6. 83/09/12, 8S1O1BOOHB
S Reportable occurrencei, LEHi tt related carreipondence
8210390267 Part 21 deficiency rvp t re pottntial galling problem betuiaen
stem t batinit of 1 HS-lnch (< larger A103 carbon Bteel &
A1B2-F22 valv*i supplied Feb 1931-AU9 1982 Valvoa fhould be
serviced &t stem b/or bonnet replaced
I8A8ELLE.L D, Corwal. Inc 32/10/11 HAVNEB. K C Region 1, QfPieo
of Director 17pp. 13834 233 24X Fiche SO-000, SS/IO/ 1 1.
8BI02902A7.
T Hearing transcripts on non-ant ltru*t mttars
B2 1 02 1 0170 Application to amend License DPR-64 changing Tech Specs re
tteam gene-rator siirvei 1 lance requirements
BAVNE.J P Power Authority of the State of Neu York 0B/10/1B
Epp 15762 238 24X Ficht 50-20fii 82/10/ IB, 8S10B1O459
B31Q21Q473 Propoiei) Tech Spec changes re steam generator
sur-vei 1 lance requirements
Power Authority of the State of New York 82/10/18
157&2 240 24X Fiche 50-206,82/10/10,0210210459
16pp
S21G2BQQ7O Foruaris response to NRC B20924 requ*t for info re girth
tiie-ld repair program
SAVMEiU P Power Authority nf the State of New York 82/10/39
EISENHUT, D Division of Licensing Slpp 19849 099 34 X
Fiche 50-286,82/10/25,8210280070
O Inspection reports, IE Bulletins & correspondence
6310070007 Responds to FQIA request for eight categories of records re
steam genera ton & steam turbines App A documents providad
in R Udili FDIA Request ai-313 Foruards documents listed In
ADO
FELTOM, J M Division of Rules and Records 82/08/10 LONG, D, J
UsntArop, Stimion, Putnam & Roberts 9pp 19643 063 24 X
Fiche 50-000,82/08/10,9210070007
B2100&O232 Testimony of JD D'Toole before US Kouie of RopT*n t ati voa
Bubcomml ttee on Energy Si Conservation o-P Committee on
Euerou ti Commerce re rol* of public participation in NRC
proceedings W/Certif Icat* df Bye Rvlate-d correspondence,
D'TODLE, J D Consolidated Ed it on Co oF Neu Yorfc B2/1O/OI Blpp
15631,204 24X Fiche BO-247, B3/1Q/O1 , B21O060H32
DOCKET BO-287 OCONEE NUCLEAR STATION, UNIT 3
F Securi tit i me i(ic*l i emergency l< fire protect ion p lane
B21001O352 Foruardt revilon to lafeguarda cont ingenc,i| plan Revision
withheld (ref 10CFR7321)
TUCKER, H B Duke Power Co 82/09/17, DGNTDN, H H OFCIe of
Nuclear Reactor Rogulationr Director lp 15374,139 84 K
Flctl* 30-269, 88/09/17,8210010352
821026032? Agr*es u/d* termination to locate fir* hose itafclon* outiidi
affected fire areas Change from earlier commitment
accepteble
8TOLZ,J F Operating Reactor* Branch 4 88/09/33 TUCKER,H,B
Duke Power Co 2pp I3B30. 1B9. 24X Fiche 30-2i9,
B2 10260329
94
DOCKETED ITEMS
B310040232 Application to amend Llcen-es DPR-33, DPR-47 5. DPR-55
r-quftts deletion of Tech Bpet 6 4 2 r. siti em-rfl.ncy drill
J, dlflnltlon of time within uhlch redundant component test
rnu-t be performed prior to performing maint per Tch Spec
TUCKEK.H B Duke Power Co 82/09/27 DENION.H R Drflce o<
Nu*lar Rtactor Regulation. Director 3pp 15SBA 104 24X
Fich* 50-269. B2/O9/27, B2 10040 238
B2IOI80323 Rapond* to 820913 1 tr re reactor bldg purge l-j
given in 91O7O7 t 17 Itrs remains unchanged Schedule for
submitting Info indicating purge sus meets operaoilltu
nquirements requested
LAINAS. C C Assistant Director for Operating Reactars
TUCKER. H B DuKe Pouer Co 3pp 15745334 24X
Fiche 30-269. B2/09/3Q. 8210180333
6210040245 Prooc-ied revision to Tee* Spec Pages 3 3*6 b i 4-1 re site
emergency drill & time, period" uitKin uihieh redundant
component test must b performed prior to performing oiaint
Dulfl Pouer Co B2/09/27 4pp I55B6 107 24X
Fiche 50-24.9, B2/Q9/27. 3210040332
P Operating license tag documents 4 correspondence
6210090036 fta-poniJs to FQIA riqueit for documents re pin* designed td
hold neutron shielding pads in place under accident
condition* Foruardf documents listed on App A
FELTON.J M Division of Rule* and Record! 82/09/13 EDDLEKAW.W
Public Interest Res-arch Group in North Carolina 2pp 134,69 240
24* Flchs 30-237, BB/OB/IS, B210QB0036
621QOB004.7 Discusi-s work iteme to be accomplished after 9BQ423
shutdown for eitindeiJ r-fueUng outage Louer thermal ihield
bolt- mill be replaced u/Inconel K-7SO tudi 6 nut asiemblg
Unit 3 tcheituleif to return to operation on B20?1S
WAQNEft.P C Operating Re*ctor Branch A B2/06/IS DENTDW, H H ,
CAflTER.J r EISENHUT.D NHC - No Detailed Affiliation Oiven lp
a 2 4X Fictie 50-000. B2/OB/lDi B2100B003&
B210040107 Advliai that utt 1 i-nporte to WJC 82021B Itr uill be
providei bg B2100B, ficip t of info From trane vendor 4:
aitraordinary analytical wort have delayed reipone
TUCKERiH D, DuSe Pomar Co B2/09/34 CEMTOM.K R Office of
Nuclear Reactor Regulation, Director STCLZrJ F Operatlno factors
Branch 4 lp I55BI 024 24X Fiche 50-2&9, 82/07/24, 6210010 107
6210040338 Application to amend Llcenies DPR-3B. 0^(1-47 (. DPR-3S Amend
requeit* delation of Teen Bne A 4 3 r *ite emergencij drill
k definition of tlni uiithin yhicA r-edundant companint tut
muit fce performed prior to performing irmlnt per Tech ap*e
TUCKER, H B Dule Power Co B3/07/27 DENTPN. H R Office of
Nucl*r Reactor Regulation, Director STOLZ,J F Operating Reactora
Sratlih 4 3pp- 15586" 104 24X Ficha 50-269,62/09/27.9210040232
6210010245 Proposed" reviiion to Tech Bpec Pagei 3 3-A t 6 4-1 re site
emertericu drill t> timt period within which redundant
component be*t mu*t be performtd prior to performing maint.
* Duke Pouer Co BB/09/27 4pp ISS'Sfc 107 24X
Filhf 50-269, 82/09/37, B2I004023a
B210190519 Di9Cu**ei NOR actions taltn under Task Interface A]rnir'
B2-2O tor *tam generator auiillarij fevduiatcr hoader
d-anage Liceniet authoriifd to reaume pouer operation it
Oconve 3
EI3EMHUT, D O Division of Licensing B2/lO/Oi DLBHlrrChl.J
Division of Engineering 1 Technical Programs lp 15717 Bfi! ;.
Fiche SO-000, B2/ 10/06, 82101 50519
B2101S052B Foruiard* aafatu evaluation re ance-thr&uoh itai |j'i-<
repair li energencij feeduater tyi mod Licenoee juttioTtiid la
retume potuer operation
LftlNAS. G Assistant Director for Operating Ra<t-0ri OJV.1 : H
TUCHEfl.H D Duke Power Co 2pp 13717 262 241:
Ftche 30-OOO, B2/10/Oi, S21O150519
B2I0150&35 Safety evaluation supporting resumption of power 4|i"'^
follouing once-through iteaFn generator repair 4 eitierg*neu
feeduAtar iga modi
UAGNER, P C , HAFIZ.A , RIDOELY, J Assistant n lp , c tor (or On" >
Raactoo 83/09/29 7pp 15717 264 34X Fith 50-000. Bin', x
S2IOI30S19
8310130502 Advises that Flow demonstration !i uiater hamner 1ilti,|ir
MRC B20929 1 1 r. conf irra that modified autlllarg feedwitir
sy* latiifactor^ Sijt supplies required amount of feeduitir
taf no evidence of mater hammer phenomenon
TUCKEfi.H B Out* Power Co B2/10/07 DENTON, H R llfflie B*
Nuclear Reactor Regulation Director STOLZ-JF OpiratlfJ "i "'
Branch 4 lp 15692 S32 24X Fiche 30-387, B2/ 1 0/07, u210l3Wf
62101SOO&5 Rxpondi to NfiC B20&OB request for addl Into n i9fl..*tF>
ibation alectric distribution syi voltages Requm-ted Into
expected bu 821022
TUCKER, H D Duhe Power Co B2/10/OB DENTDN.lt R (IflKi a*
Nuclear Reactor Regulation, Director BTOLZ.JF Opratln| P+t '
Branch 4 lp 15720 010 24X Fiche 50-S69, S2/10/09.
-921O1300&O Forwards partial response to Franklin Itvseaich Clr
tichnical avaluatlon rept re control of heavv lo*cft.pr
TUCKER, H B Dute Pouer Co 83/10/09 DENTOM, H R GfFli-r i
Nuclear Roactor Regulation, Director BTdLZ, J F Clptr4Ui|
Reacton Branch 4 5pp 1S720 Oil 24X Ficha SO-So 1 ?, DJ/10
8210180053
9210110145 Forwards Amend* 113,113 It 110 to- Llcens-es DPR-3B. DPR-47 t,
DPR-33, repec t Jvely, aaf t<i evaluation -Si notice of issuance
& availability Attends revise Tech Spies to alloui full pouer
operation of Unit 3 during Fuel Cycle 7
WAQNEft, P C Operating Reactor* Branch 4 B2/D7/29 TUCKER; H B
Dule POUIBT Co. 2pp 15737341- 34X Fiche flO- 269, 32/09/29.
B2XOI7014-S
821O2J013I Reiponds to MRC 9 2090 B Itr transmitting technical i-
rjit on emergencij feeduiater iiji Syi may not meat atL currinK
criteria for seismic q.ua 1 1 f Icat ion. but ul 1 1 remain
func t iona 1 lij operable during ODE
TUCKER, H D Duke PouBr Co B2/10/I3 DENTDNi H R Cffltl o
Muelear Reactor Regulation, Director STOLZ, J F GpirAtir
Dranch 4 4pp 13766 356 34 X Fiche 50-269,02/10/13-
8210190184 Amends. 113.113 E. 110 to LUtntsi DPR-39,DPR-47 fc DPR-55,
respec tivelij, revisins Tech Bpeci ta allow full pauer
operation at Unit 3 during Fuel Cycle 7
BTQLI.J F Operating Reactors Branch 4 62/09/39 31pp
1S7S7 343 24K Flehe- 30-269, B2/09/29, B2IO190I 49
-BB10W01A1 Safttij evaluation -supporting Amends 113,113 b 110 to
Uesnitu DPB-3B, DPR-47 * DPR-S3, respectlveilj
* Office of Nuclear fleactor Rigulatlan, Dirctor a2/09/Z9
15758 018. 24X Flcha 30-269- B2/09/27, B2 1O170145
6pp
~ B21019O1A9 Notice of {nuance J, yal l*b il 1 1 of Amendt 113.113 Si 110 to
Licns DPR.-3S, DPR-t7 !. DPB-9S, respectively
8TQL2iJ F. QperatinB Reactors. Branch 4 8B/09/8?, 2pp
15758 01B. 24X Fi ehe. SO-B4?, B2/09/S7, B21019014B.
8210210292 Advitu that revieu of info on mad* to emergency feaduater
syi & rvpalrt mida ta onci-tnTough sttain gineratori
complete. Plant mag resume operatton u/llited eonditlont
LAIHA8,0 c Anlitant Director for Operating Reacton B2/09/S9,
TUCKER, H, H Djke Pouir Co 3pp 19774:1347. B4X
FIch, SO-2B7., 82/09/2?, B&102 10292
3210210407 Application to amend DL>, revi sing Tech Spec 3 I Mtr.'|
full pouer operation of Unit 1 for Interim period -until
appropriate lafety valve ring settings can be imp leminled
TUCKER, H B, Duke Power Co 82/10/14 DENTDN.II R OlUtt *f
NucUar Reactor Regulation, Dine tor STQLZ, J F Clparaiif-f *tj.
Branch 4 80 p 15764 03 S 24 X Fiche 50-349, 62/10/14, S3JOJ1C+: 1
8210210411 Proposed revision to Tech Spec 3 1 allowing lull it.i'
operation of Unit 1 for interim period until approprl *lt
lafetu, valve ring setting can be implemented
1 Duftg Pocjtr Co, B2/10/14 lp 19764 04B 24V
Fichl>: S 0-26 9, B2/10/14, B210210407
OJ Inipection reports, IE Bulletins 1< correspondence
B210O70007 fleipandt to FOIA request for eight categarlrt tl tt
*tim generator! ti steam turbines App A documents pravltfea
in R Udell FOIA Request 81-313 Forwards document! 1UU< i
App B,
FELTDN.J H Division of Rules and Recordl, B2/OB/fO LOA
Hlnthrop, Stimion, Putnam t Roberti ?pp 19649 063 StI
Flche:5-0-OOO, 82/03/10,8210070007
8210210299 Safety evaluation supporting etean generator repair It
emergency feeduater iiji morit
* Office of Nuclear Rtactor Regulation, Director. 82/09/39. 7pp.
19774:390, 24X Fieht. S0-2fl7, 82/09/B?, 8210210292,
9210070172 Forwards info re steam generator Inttarit^ ! irt|i tt
operating PWft-s, per 790320 b 21 requests Detail* ol Inipi.
Including <Tafct indications, tube plugging criteria i. t-ulu
plugged will not be provided except for Point Beach I
QOLLER, K. R. Division of Reactor Licensing (WHH-I97J -gnl,-:
73/03/24, MACCARY 1 R.fl Division of Technical Flevliu <MM-ifT
onli|> Spp, 13649 194, 24K Fieht 90-000, 82/OS/IO, WJMTCX T
DOCKETED ITEMS
95
015036'? Forwards results of investigation of Item 7a of IE Insp
'epli 3O-269/B2-2I. 50-270/02-21 t> 30-287/82-21 Deadtlma
alut! for gairma spectroscopij analysBB of waste gas silver
eolite cartrlrfgea will cause onlij insignificant errors
OCHER.H B Duke Pouier Co 82/OB/I7 Q'fiEILLY, J P Region S,
Iffice of Director 3pp 1S7O4 269 24X Fiche 50-269, BS/QB/17,
13101 5O369
8210130290 Request*. relief from intorvue inp rq.uir ementa
(hydrostaticl of Git t ion XI of AS HE Boiler ! Prure Veiul
Code
TUCKER, H B Duka Power Co 92/10/04 DENrQN.H R Office at
Nuclear Reactor Regulation, Director STOLZpJF Operating Reacto
Dr*nch 4 20pp lSA7ff 243 24X Fiche 30-269, B2/ 10/04, B210130390
QOI0117 Forwards IE Inap Repts 50-269/83-33, SO-27O/B2-33 b
,0-337 /SJ-aa an S20B17-20 No noncomp 1 iance noted
irtrrcE.M C Division nf Project !< Resident Programs 82/09/03
HJCKER.ll D Duke fouler Co 3p p 15566 O19 24*
xch 50-269, 03/09/02,6210010117
'310010134 IE Insp Ropts 50-269/83-33,50-970/82-33 (. 30-337/03-33
on 8.20Q17-2O Ho noncomp I iance noted Major areas inspected
action OBI previous enforcement matters, au 11 1 lary feeduatar
header repair !< insorvice Imp procedures
CROULE^.D R , BLAKE, J J Division of Engineering t. Technical
Pragrans B2/09/01 Bpp 1 5566 021 24X Fiche 50-269, 02/09/OB,
aaicoioi 17
OQIOISQ Forwards IE Insp Repts 50-269/82-3O, 9Q-27O/02-30 ti
iQ-287/a2-3Q on 0307(6-0810 Mo noncomp 1 lane e noted
WICE. H C Hiviston nf Project 6 Resident Programs 82/09/03
UCER,H C Dulo Pnuier Co 2pp 15567 258 24X
Jche 5O-269, 82/09/02,0310010158
IE Insp Ropts 50-269/82-30-30-270/82-30 fc 30-287/32-30 on
e3O71&-OS10 No noncompliance noted Hajnr areas inspected
operations , survei 1 lance testi tig- mainti NUREQ-0737 mods EC
refue-ling activities
ORDERS. U , FALCONER. D , BRVANT, J C Division of Project & Resident
Programs B2/O9/02 13pp 15567 36O 24X Fiche 50-369,82/09/02.
8208190233 IE Info Notice BO -35. Sup pi 1, "Lasting & Dllladgeil 1-123
Implant Setdi " Svc list *nel*
COBB-L I Diviiion of Fu e 1 Facllltln, Materials
B2/10/06 ConiolidatBd Edison Co of Meu York
24X Fiche SO-OOO. B2/ EO/06, 93081 90233,
Safeguards
66pp 15761 250
B2 10220426 Foruardt Rivliion 5 to rKponie to IE Bulletin 79-02, "Pipe
Support Dale Plate Deiigns U* i n g Concre-fce Eipanilon Anchor
OoLtt "
TUCKER, H B Dull* Pauirr Ca B2/1O/OB O'flEILLV-J P Region S,
1577B 373 SAX FichB 50-269, B3/10/OB.
OfPic of Director
0310220436
24pp
830B19023B IE Bulletin 82-03, "5fcrs Corrosion Cracting in Thick-
Mai l,Large-Dim ter, Stilnlei* Stael, Recireulati on Sgs
Piping t BHR Planti Bvc list gucl
DEVaUNO.fi C Dlractor'i Officer Office of In a pec U on and
Enforcement B2/10/14 Contol Ida t ed Ediion Co of MHJ York
115pp 1501O IBS 24 K Fich* 30-OOOj H3/1O/ 14, B20B19023B
R Period if ope rot ing reporfei & related corrsmp nndonce
B310190544 Forward* monthlg operating rpt for Sept 19B2
TUCKER, H D Duke Power Ca 82/1O/IS Director'* Office, Office
at Inspection and En f op cement Ip 19751 343 Z4X
Fichu 50-36?, ea/10/19, B31OI70344
CG1O43B Act receipt of 830HOD Itr informing NRC of steps taken to
Direct violations noted. In IE Insp Itepts 50-2t9/02-23,
>o-27o/e2-23 (. 5o-aa7/aa-23
, ft C Division of Project fc Resident Programs B3/09/17
D Duke Power Co Ip 1 557O 102 34X
'tclte S0-?ii9, Ba/0?/17, 0310010458
3210010463 Rasponils to NRC 820712 Itr re violations noted in IE Insp
FlBpts 50-369/32-23,50-370/82-23 4 50-287/82-23 Corrective
actions porsonnel counseled & valve 3HP-I4 cut out ft
proper lij roinitalled
IUCHEH.H G Duke Pouiar Co B2/OB/05 'REILLY, J P Region S.
Office of Director 4pp 15570 183 24X FichB 50-269,82/09/17,
Q2100IO43B
Forwards IE Insp Repts 30-269/03-23,90-270/82-23 b
SO-2S7/BS-2.T an 820910-0610 (. notice of violation
LEWIS. R C Division of Project i Residnnt Programs 82/07/12
PARKER, W O Duke Pouier Co 2pp 15370 187 24X
Fiche 50-267,82/09/17,8210010458
B2I0190553 Hanthlg operating rpt for Bep.t 19
REAVIS, J, A Dak 9 Pouier Co 83/10/15 lipp
Fiche 50-267.82/10/15,9210190344.
15791 344 24X
8 Reportable occ irrranceai LERs & related tor rasp and once
S210120114 Advi*e of immediate need for imputing specific
requirement* r operational rvatrictlcmi far- Class IE
12O-volt ac vital instrument buiam in operating p lantl
MICHELSON.C Director's OPfieo BO/07/15 DEN TON, H R Office aP
Mutiear Raacbor Regulation. Director If 3667 165 34 K
Fiche 50-000, BO/07/I3. B21012O1 1 4
83I001000B Responds to POIA Tq.uet for 1? categoTte* of documentn ro
nuclear reactor svnnti ti tjfetij prob-lamt Foruiarda document'
lilted in App A
FEL.TDN. J H Division flf Rule* and Records 82/06/39 UDELL, R. A
Critical Mass Ensrog Project ISpp 15737 003 H4X
Fiche SO-OOO, 82/06/20.3210010000
IE Insp Repts 50-269/82-33,50-570/82-03 fc 50-287/83-33 On
020510-OJilO Noncomp 1 iance noted failure to follow procedures
resulting in plant trip l Inadequate procedure resulting in
improper reassembly of safety-related valve
OREEfIS, H , FALCQNER.D , BRVANT.J C Division of Project fc Rosident
Programs B2/07/09 Igpp 15570 191 24X Fiche 30-869.82/09/17,
O2 100 10458
10150353 Forwards IE Insp Repts 50-269/83-32,50-870/83-32 &
30-207/32-32 on 820817-10 No noncorap 1 ianeo noted
DANCE. H C Division of Project (. Resident Programs 83/09/17
TUCKER, II B Duke Pouier Co 2pp 15703 267 24 X
Fiche 50-269-82/09/17,5310150253
IE Insp Repts 50-269/82-32,50-270/82-32 S- 50-287/82-33 on
Q20817-1B No noncorapllanCB noted Major areas inipec tei)< lab
dC & rev leu of radiochemi stry procedures Si records
EvAN3,C D , MONTGOMERY, D K Diviiion of Emergency Preparednett &
Operational Support 82/09/19 3pp 15703 369 34X
Fiche 50-3ii9,a3/09/l?,flS10ig0253
10ISO131 Foruarila IE Insp Ropti 50-269/82-33, 50-370/B2-35 t
50-237/82-33 on 830909-10 No nonconR 1 ianca noted*
DAHCEr M C Division of Project & Resident Program* 88/09/33
TUCKER rH D Duke Pouer Co, 2pp 1569S 312, 24X
Fiche 50-269,83/09/33-8210190131
6210150143 IE Insp Repts 90-269/82-38,90-270/82-39 & 5Q-287/B2.-35- on
BSOfOB~lQ No noncomp 1 iance noted Major areai inspected
ftCS leakage calculation*
BUHNeTf.F T, , JAPE.F Divifion of Engineering 1. Tnchnical
Prc-gr am i 62/09/21 4pp 19698:314 S4X Fiche SO- 2i9. 02/09/23,
8210190447 PNO- 1 1 -B2-10B- on BH1O1 O, Increating stam generator tube
leakage indicated in 3A iteam gvnvrator Reactor placed in
hot shutdouinv No abnormal radioactive relaases Identified
IflNATQHlfirA, . DRYANT, J C, Rag i an 2, Office a* Director 83/10/13
Ip 13740' It 1 ? 24X Fich* SO-UB7. BS/10/1S, B21OI 90447
0210190633 PKO-II~B3~111 on aSlQ14,Ur.it 3 ,hut dc-un after determining
that pi-eisur i ler cad* *aftu valve iSevign flow could not be
fully maintained if called upon B*ven-rfay outage required
ta change valve* Enamp tloti requeittd for Unit 1
IGNATON!S,A Ftaglon 2. Office at Director 82/30/14 Spp 24H
Ficha. 80-207. BB/10/14, B21OI 90AS3.
8210190699 R8 on BS1014,Unlt Z care relief valves declared Inoperable
due to inlyilt prompted ou. Bin vafetg concarn, Ifnl t 3 valvii
uere offiltv undergoing ring id jutmnt Immediate shutiTouin
at Unit 2 commenced.
* Duko POUIT Co B2/10/14. Rfgion S, Dftica of Director. Ip.
1S736 BOO 24X Fich' SO-270, 82/10/14, B21O19O693.
8210290303 Foruardt LER BZ-OlO/OlT-O D*taild >v*nt analu.l end
TUCKER, H B DuKe POUBF Co 92/10/16 O'REILLY, J.P Region 3.
Office of Director. Spp 13993 01B Z4X FichB, 30-287. BB/10/ IS.
821027O30B
--6210390313 LER B2-Q1Q/O1T-0 on 821004, diicovdrail that waellu boron
wait* starag* tank boron lample not taknn ai ichedirleif,
contrary to Tech epic 4, 1 3 Cauied bg parionn*! not having
cce* ta patted ichadifla board 1 Board rap la,c>d.
PETTV,J C. Dute Power Co. B2/1O/I8. Region 2, Office of
Director. Ip. 19BS3 OBI 24>C FUNf 50-2S7. B2/10/ie, 8210.2TO3GB
96
DOCKETED ITEMS
DOCKET 50-2B9 THREE NILE ISLAND NUCLEAR STATION, UNIT i
F Security medical, emergency !i fire protection plan*
B21Q050471 Forward* iiamption from annual emergency plan eerciie
requirement* of IWFRSOj App E T level of govt
part U ioatlon
SIOLZ.J F Opt-4t l ng Reactor* Branch 4 B2/09/14 HUKlLt-H D
Qneral Put 1 i c Utilltie* * CPU Service Corp, 7pp 15636 271 24X
Fich* SQ-2B?, 82/09/14.8210050471
Eai0030495 Exemption from annual emergency plan requirements re IttVel
of govt par ticipation in eiercnea
EISENHUT.D Division of Liceniing BS/Q9/14 Osner*! Public
Utilities - GpU Service Corp flpp 1S62-6 398 24X
Fiche 50-289, 82V09/ 14, aai005(H91
82IO06032B Forwards revisions to fit** fiaiards analysis rept ti App R
Sett ion III TI iafe ihutdo-un evaluation
HUKILL.H D General Public 1/tiliti* -CPU Service Corf S2/10/O1
EISENHUTj D Dlvlsinn of Licrntins 2pp 15620 013. 24X
Fich* 50-237.62/10/01,3210060220
8210060230 Revltiorn to fire h,aiard analysis rept k App R Section
1 1 [ re iafe shutdown evaluation
General Public Utilitim - OPU Service Carp 82/10/01 32pp
15630 019 34X Fiche 50-239, S2/1&/OI.S21 0060223
8210050176 Brief in mpport of eiceptians to ASLD B1CB27 & B30'
partial Initial decisions re mgt ittuet h reopened
proceed ing i
BRiftOFOaD.L . DORDSHOW. J Three Kilo Island Alurt 03/09/30
Atomic Safety and Liceniing Appial Panel 93pp 15i04'OB3
Fichr 50-389,83/09/30,0210050176
621003O192 Brief on e. captions to ABLB B10B27 t 020727 pirtltl
dtciilonn on mgt Inuat, training !< integritv Certificate O f
Svc encl
AAHODT, M H Aamodt*. Tho 82/07/30 Atomic Bafetij tnd U
Appeal Pans-l 36pp 15607 336 24X FichB DO-2B9,
82100501V2
B210050237 Adviiv* that THI AUrt unable ta pruiont f ul l j itiit
some L*iut >n brlif due to severe time constralnti
BRADFORD, 1. ThrssMile I i land Alert B2/07/30 EDLEfli J
Safety and Licenting Appeal Panel DUCK. J H , KOHL, C Alnfl
ard Licencing Board Panel Ip 15609 051 34 X
Fiche,SO-2a9. 92/09/30.6210050237
S2 100 602 10 Brief tupportlng UCg brief on sicsptions la Atl B
partial irittl*! decision ASLD cannot continue to r D lv on
operator judo rn*nt understanding d integrity to CDmpeiitalr
for lacli of reliable equipment Certificate of Svc ncl
HE I S3, E R Hrtrojiolltan Editnn Co WEISS, E R tl.irmnn , Ut
B2/ 09/30 Atomic Safety and Licensing Appeal Pnel 16 (*
15614 121 24X Fichtt 50-2B9, 02/09/30. B210060210
B21OI3024B Advitec of dlry farm located ipproi 1 I mile* rait of TMI
ijielding ifoae c omrai tmiint greater than fix of isven prviant
milfc lampling tfcation* R=!ult of land cenui to bo included
in. 530501 annual radiological environ operating rept
HUKIUL.H D Ovneral Public utiliti** -CPU Service Corp B2/10/04
HAYNES.R C Region 1< Office of [H rue tor Ip 15476 008 24X
Fiche BO-aB9. B3/10/C.+,931O130B4B
ClaTi*|* position re Action 4 ut IE Bulletin 77-21, "Ternn
Effec-ti on E-*vl HeaGurementi " Iricluilon of tablei. curvti
or CQrrvctior Factors in emergency procedures uill
unneceii-ari 1'y comjil icat praceduret,
HUnlLL.H D General Public Utilitis* -OPU Bervice Corp BH/IO/01
llAYNea.ft C F1gion I. Office cf Dicector 2pp 15701 334 34X
Fie h' 50-889! ea/10/04, 621015020-2
B31O06021B Qrmf in tupport of exceptions to ASLD B3b?l pirll* 1
Initial decision on reopened proceeding on operator
cheating CertlfiCAte at Svc encl
ADt-ER.R H Penni^lvania. Slate of 03/09/30 ft t omit CTifrlU
Lioniina Appeal Panel 45pp 15614 343 24X rich* 90-fQV.
62/09/30, B21O06O21B
Q210070194 Fnruardt TNI training program asHHSiemint, rBpr*tn.tt r-t
recent view or program & covering hearing topics Q|=u hat
made i i gnif i cant progress Recommendat ion for changgi mad*
W/o rfpt Bvc Hit oncl
BLAKEjE L Shatir. Pittman, Potti fc Traiubridge BUAHt. L b.
HetropiMitdn Edit on Co 02/10/05 EDLES.G J > DUCK. J II , Ki'S-
Atomic Safety and Licensing Appeal Panel 4pp IHiiBI BM J+l
Fiche 50-289, BK/ 10/05, B210070194
G310130161 Reipondf to ABLftD 011B04 partial initial deciilpn re aler
t- notification ayi Siren *i]i for offiltt alerting adeg.uat*>
pending determination of compliance u/NUREQ-0454 &
FEHA REP-1.
KRIMH.R H Federal Emirjonci; Management rtgencg 0B/10/Q6
ttRIHES, D Dlvition df Emaroencu PrapArttfneti 9pp 15673 0'61,
Fich* 50-267, ea/10/Ofi.B2l013016l
321O1303SO Bobmiti updated itatu) rept on offiJtt emergency planning
tiiuet at facility Emergency prfrparedneit brochures
dlitributvif Slrtn iy tetting titifactoril(j ccmpleted
Con<nuncati or> drill held an quarterly haiii
KRIMtl.R H F*>d*ral Emergency Management Agency 85/10/0*
CRIMES, 9 K Division af Emergency Priparadnti Bpp 15*79.150
24X Fich* 50-26?. 02/10/06,6310130320
Ad judicatorg correspondence
6310070080 Board Notification B2-93 foruards RJ Mttion 020830 memo
to DO Eiienhut notifglnj of r(ult of Samiicale tfit on
fd & -bleed capabllitv
LAINflS.O.C Aiilitjnt Director for Operating Reaeton fl2/09/14
Alamit Safety and Liceniing Appeal Ptntl 4pp 15645:317 24X
Flehe 80-289. B2/0 1 ?/!*, B21 0070020
9210070032 Renjaiti all PUR llcenilng boariti bi informed of rinultt o f
8miicle feed d bleed teife. Uneipectid uncoviru of cor*
ImUlator occurred
MATTEON.R.J. Divition of SijtiM Integration <po-it B11C-03).
B8/OS/30 EIBENKUr, D, J Dlvfilon of Lictnting 3pp. ISfi49-321
S4X Ft ch: 50-2B9, B2/09y 1 4, B2I007002B
8210070035 Rtcomniendu (hat board notification on SmUc*li Fetd & blued
ei[prinint not be inued
BASBETI. O E DIvlilon of Accident Evaluation 92/OB/23
SPEIS-T. P. AttUtant Director for R*ctop Safetif 2Bp
1S649 324 34X Fiche: 90-2B9, 82/0?/14.Bai007002e.
3210010487 Menarandiin fc order granting liceniet nquttt to refer Aanodt
8BO-)03 motion to reopen tvdan*i*rg retoril to A BLAB ABLAB
Iflcli jurliflctlon over mbj matter
0MITHiI-M. Atomic Bafti| and Lieenilng Boafd Panel BS/Qf/St
Metropolitan Ed lion Co. 3pp, IBSi9;3S3. 24X Fieha 50-.239, B S/09/29,
BE 100 10427.
8210070133 Order tcheduling 02110? hearings in Harriiburg, I=A C er
mill hear partlee re ASLB 011214 h 820727 partial Itllll*!
decliioni ^ uill hold public meeting on restart
CHILK. S J Office of the Secretary of the Commliiion (l;/l-C^
3pp 13627 077 24X Fiche 50-237.02/10/06.031007014')
210080094 Foruiardi liceniee fint annual progrtts repl on ir^il
of ia,ct replica ilmuUtar Did package delayed from Apr la
Sept. 1782 Installation eipectsil in 1-7SS Svc Hit int]
QUAKE, E, L Shaui. Pittman, Pott* k Troubridg* Di/tHE.t [
Metropolitan Etflion Co ea/IO/Oi EDLES, J . BUCK, J II , fQ
Atomic. Safetg and Liceniing Appeal Panel 7pp ISt^O U1J
Fich 30-289,82/10/06,9210000074
8210120274 Reapondl to 020914 n oa rd Notification DM-OK-yD r
teiti on feed t< blied t> motion that ABLAQ direct HilC Ln
provide pertinent documentation UCB Etceptioni 9- 1 I , I6> lO
& 1O7 should be nuitalned W/Certi f 1 ca t of Bvc
POLLARD, B, D . WEIGSrER Union of Concerned SeUntltti
Harnon I Ueiti 82/10/07 Atomic Safety and tlcenitng
Panel 17pp 15A53 297 S4X Fiche 50-207, 02/10/07,
8210130279 Mvitft that Itr-dmig nated Individual rttlgnH
S2IOI9 Individual uai MRC liceniad control room operilor
wJion ptrformance an teiti V e>ami uai lnut in riopine*
p4>ae op praceeding Svc li*t encl
BLAKE.E L Shauj Pittman, Pott* t< Troubridge BLAKE . t I
Metropolitan Edion Co 02/10/07. EDLEB. J . DUCK.J II ,
Atomic Bafety and Liceniing Appeal Panel Gpp 19670 IA?
Fie he- 30-209.82/10/07, 0210130278
. ( ,
2*.
B210l2025i Foruardl Corami*lon 82 1006 order ichtdullnp.
in Harr itburg.PA. in reiponi* to B1121& requeit
BICKMITil. Office of the Q>nral Countnl 02/10/00 10( , ~
Kile Itland Public Interdt Reinurce Center Ip, ISA13!|| ...
Fiche 50-269,02/10/08,8210120256
8310120314 Forward* Commliilon BS1006 order advlilng of
meeting in HarrlburgiPA
BICHWIT, L, Dffle. of th Oeneral Couniel 82/10/00
Dauphin, County, PA Ip 1S631 251 24X Fiehe, 30-Sa
9210120314.
8210130238 Req.ueiti to make limited appearance itatemenl *t t,
8211O7 meeting In Karriiburg. PA re lifting of im|d|ati **'
f tuc tiveneie order*
HOFFHAM, J Fi-lendi & Family of TM1. fl2/10/OB CHILX.fl .
of the Beeretary of the Commlfdon Ip 13470 aOS 94]
Fich*' so-aa9 f ea/io/oa, 0210130233
DOCKETED ITEMS
97
S-aiG2H)359 Motion to file brief supporting etceptions to ASLB B 10807 I,
330727 partial initial decisions out of tin* an SSI 002
C ircumi tantes beyond intervene? control necessitate
eitension Certificate of Svc end
AAMODT.M H Aamodti, The S2/IO/09 Atomic Safety and Licensing
Appeal Panel 4pp 15763343 24X Fiche SQ-2B9. BS/ 10/09,
Q21D21O399.
82101S01AO Advliei that Itr-deiionated Individuals *c VV will not
T-Biponif to UCS, Commonwealth of PA, THI Alert b Aamodt* brief
supporting eiceptioni TTt! Alert Eiceptions 23 ti 24 & Aamodt
Eiception 133 waived
VQIOT, H H LeBoeuf, Lamb, Lefby ic MacRae 82/10/13 EOLEB- J ,
BUCK..) H . KOHL.C N Atomic Safety and Licensing Appeal Pan* 1 If
13719 169 24X Ficho 50-209. 82/10/13, B2101S0160
Memorandum ! Order CL1-B2-31 directing IE to determine
uhether civil penalty proceeding ihould OB Instituted
against licensee for acti uncovered in hearing It Ofc of
[ fives i igationi to investigate illeged matl falie statement
CHILK, S J Office of the Secretary of the Convni It ion 82/10/14
IQpfl 15711 135 24X Flche 30-289, B2/1O/1 4, B2I01B0180
6310300033 Advi iff that licensee will file on* coniol idated brief-
931104, in rssponse ta Commonuaa 1 th of PA.TMI Alert, UCB &
Aaitiadt brief! supporting appellant eiceptioni re mgt
is-sues.Svc lilt end
BLAKE. E L Shaui. Pittman, Potti t< Troubridge BLAKE, E L
Metropolitan Ed i ion Co 62/10/14 EDLES, J . DUCK. J H , KOHL,
Atomic Safety and Lie Billing Appeal Panel
Fichu 50-289,03/10/14,8210300033
4pp
157S7 304
24X
831O2COOOS, Order directing NRC to respond to UCB B21007 motion,
c hjrac tn icd ai reiponie to Board Notification BN-EJ2~93,
that NfiC provide all document* re temitcale teit on feed b
b I ead capabi 1 ity
SHOEHAKEH, C. J Atomic Safety and Liccniing Appeal Panel 02/10/13
Office of th* Executive Legal Director 3pp 1S7S3.20S 34X
Fieho 30-209. B2/10/15, B210200006
B21029O332 Corrft ted separate vieui of Cummi i s ionen TM Roberts &
V Oilinsky on Order CLI-82-31
ROBERT8.T M , OILINSKV. V Commi is i oner* 83/10/21 4pp
15790 078 24X Fiche 80-209,03/10/21,0310250325
B2 103404 3 3 Decision AC.AB~j,9S affirming ASLB deemon not to require
predistributl on of permanent record doiim*ttri (, modifyinfl
decision on ern*rqenc-y mupport director
SHOEMAKER, C J Atomic Safety and Liceniing Appeal Panel S2/10/22
67pp 1980S 323 SAX Fiche SO-SBt, 02/10/22, J
6210260449 Dsciiioii ALAQ-&97 affirming ASLB decltioni or emergencij
planning u/condition that Commanuiral t h of PA agricultural
info brochure be given to farmer* in (0-mile plum* eipO'iure
emergency planning ion*
SHOEHAKER.C J Atomic Safety and Licensing Ajipsal Panel BSJ IQ/22
SOpp 15307, OS'S 24X Fich* 5O-2B9. 62 /IO/22, B21O36011?
B210204fia Order CLI-B2-32 advising that ASLAD ihould not be conctrnud
about current Bfc-atui of compliance ui/restart raqui r ementi
Proceeding ihould determine n*c stsarij actioni to protect
public t prograis of long-term ittmi
CHILK, B J Office of the Secretrartf of fane CommistiDn 02/1O/22
Atomic Safety anif Licanung Appeal Panel 4pp 1 9B06 224 3 -IX
Fiche 50-289. B2/10/S2, aS!O2iO46B
B210270090 Reiponie to ASLAB 021015 order UCS rque*t *or relief in
B21O07 reiponte to Board Notification BN-B3-<)3 should be
denied All document* MRC consider! relevant & matl re
Semitcaie tev ts lerved on UCS
RAUEON. R J Hxring Branch 4 B2/1O/25 lOpp 15015 302 H4X
FichB SO-HB 1 ?. 82/10/2S, 3210370090
B21O27O093 Affidavit aP BU Bheron ! WL Jensen re Semiscalc S-SH-2
reiulti Tet t rufiult* do not raise significant safety isiuai
do not nhibit any neu phenomena It can be adequately
predicted by lifting computer codet W/Cert if ica ta of Svc
EHERDN, D 14 , JENSEN, W L Reactor Sgitams Branch 02/10/33 43pp
19815 311 34X Ficha SO-ES?, B2/10/23. 031027009O
Order otending time until 831022 for CommiiBion to act to
review ALAB-AB3
CHILK.B J Office of the Secretaru of tha Comralstion 82/10/15
CommiHiionen Ip 15753 SI I 24X Fiche 50-299,88/10/19,
3210200011.
SSI OH 1037 B Ad vim that author ui 11 repreient Commonwealth of PA at
821 IO9 oral preientationi before Comminion. Svc list end
ADLER.fi M Psnntijlvania, 5Ute of 82/10/18 CHILK, B J Office of
thw Secrataru of the CommlBtlon, 3pp 13763 147 24X
F icha. 50-289, B2/10/1H, B210H10378
e2lO2Q400 AdvUei that NO Aamodt ulll repreienl; Aamodt family at
O21I09 o-ral preientations in Harri*burg,PA
AAHDDT. H M Aamadti, The 82/10/17 CHILK. S J. Office of the
Secretary of the Commission IP 19803, 103 21 X
Fiche 50-289, 82/10/19,8210260400
831O21Q374 Notifies that licensee will appear at 881109 public hearing
to make presentation d respond to queftloni re restart
Licansve etpect* to reierve portion of time for rebuttal of
other preientationi Svc Hit end
TRQUBfllDQE, F Shay, Ptttman, Pottc & Trnubrldge TRQWBRIDOEiO F
Kebropolttan Edi*on Co 82/10/20, PALLADINO.N J . OILIN8KY, V .
AHEARNE, J F. Commisiionari 4pp, 19762 014 24 X
Flche 30-aa 1 ?, 82/10/20,8210210374
B210SB0250 Confirms B2IO25 telcon in which Docketing b Bvc Drancli
agreed to add name to ivc liitiai counsel far Iti deni-gnated
Individuali D & W Related correipondence
KCBRIDE.H F, LeDueuf, Lama. Leiby & K*cRdi 93/10/35 DoeltBtinn
(, Service! Branch Ip 1 5837 O50 24X Fiche 50-2B9, BP/JO/aD,
8210280250
B2I0200360 Reply opposing UCS 021OO7 responie to Board Notification
82-93 re Sunlit* la tetts of f**d ti blcod & motion that
ASLB direct NRC to prqvide documentation Feed it ble-ed
cap*clfey not eBiential to operation W/Cei- 1 i f j cate of Bvc
BAXTER, T A Matropo 1 1 6an Edit on Co BAXTER, T A Sham, Pittmun,
Potts b Troubridge, B3/10/2S Atomic Safety and Licensing Boar4
Panel 9pp 1&B49 146 24X FicJia-SO-aa 1 ?, B3/ 10^25. 821 OHB0360
B2102B02fi5 Ordur allocating time for presentation of oral arguments on
imiiedidte ef f >ctlvenei of ASLB B2O7E7 & 811214 partial
initial decisions Iisgei to be discussed in detail lilted
CHILK, S J Office of th Secretary of the Commission B2/10/37
2pp. 15837.312 24 X Fiche 30-389, 02/ 10/27, B210SB0263
Bal0StG493 Order eitablishing arrangementi for 821109 meetings In
K*rr 1 ibura> PA r* restart
CHILK.B J Office of the Secretary of the Commission. 82/10/20.
3pf 15762.89? 24X Flch- 50-889, 82/10/20, 8210210493,
8210220443 Advises that JM Cutchlng.JR Goldberg t, Jfi Or* will
rB-p-rc*.>nt HRC at oral argumint on whether to lift
I immediately effective shutdown orders In vieu of ASLB
B207S7 ti B1IS14 partial initial decisions.
GttAVrJ.R. Kearing Branch 4. 82/10/20 CHILK, S J Office of the
Secretary of the Commission Ip. 1977B 33B 24 X
FJchei a-O-SBt, 82/10/20, BS10220449.
93102204^5 Advise* that author mill represent UCB at B21107 oral
tirgi/ment Certificate of Eve encl
WEJ8S.E R Harmon & Heii., MEIBS.E. fi Union of Concerned
Scientists. 82/10/80 PALLADINO.N, J , AHEAHNE, J, , OILINSKY, V.
ConmivsiDneri 4pp 19779: 121 24X Fiche: 30-289, 32/10/30,
0210320443-
B21O25O329 Foruard* Commi si loners TH Robert* fc V QUinikij corrected
npjrat* viius on Order CLI-S2-31
STUCKV-S M. Docketing & Services Branch. 08/10/21 Office of the
Excutiv Leg*l Director. Ip, 13790.077. 24X Fiche 50-2B9,
02/10/21,8210290329
DOCKETED ITEMS
6210070440 Pe,p Q nd* to 620935 ! tr transiting constitu.nl JB HUF*
330310 inquiri, re restart Chances ade a* r.ault of reopenad
nraceedlngs uill satisfy conta-m*
DIRCK5 H J Office of the Emeutive airactor For Operation*
33/0-5/16 SPECTEfl.A Senate 4pp 13649 2-34 24X
Fiche 50-299. a2/0?/!6. H21007O44O
Request* response to constituent JB Hurst Q20B10 Inquiries
NRC - Ho Deta.led
24* F>ch. 50-2B9, EJ2/0*/! fe, S210070440
aat031050l Respond to constituent J Doroshou 930025 Itr r* ASLU
Bitial initial decision on cheating TM1 Alert Jileo
eitflptlons to dcision presented vl eius on re*tart to
DIRCKS, U J Office of the Efetutive Director for Operation*
B2/09/2 1 ? SPECTER, A Semti 9(p 157B2 266 24X
Pith* go-as?, aa/09/a 1 ?. saioaiosoi
S2H0350015 Re. ponds to cunstitufrnt J Doi-oiTnau 030820 Uf re ASUD 330727
partial initial decision Commission U now deciding rut act
DIHCKS.w J Office of the Executive DiriKtor far Operations
B2/09/2 1 ? PRdXMIflE.U Senat* 7pp 1 5SOQ 126 24X
Fiche 50-239.82/09/29.9210250015
ratnr- eam cheating must be
,S!r lr T" 5 HU. d I.l,nl *Urt S2/10/83 PALL^WO.N J ,
CILINSKY, V . AHEARNG, J F Commi stloner I 2pp 15037 042 BtX
Opinf-s that n""tlon
r lr T" 5 HU. d I.l,nl
V . AHEARNG, J F Com
50-269, B2/10/2S, B2102B033A
J Insurance & indemnity lnForma*10-n
ai0150U7 Forward* Endorsements 53 fc 54 tg MAELU Policy HF-73 t
Endorsements 1 ft i2 to NEUIA PoliCV NF-330
OERETV, H F OenBTal Public Utilities - QPU Service Corp. B2/10/07
SALT Z MAM, J Antitrust * Economic analysis flrjncli lUtlUtg Finaneel
5pp 15i,9/ 359 2flX Flche 50-289, BE/10/07. B213IS0147
O AdviSQpy Commit tn on Reactor SaFegtiardi repnrts t coiTBapon dnnc
9310090015 Addl i-BSoonso t" FD1A raqyest for 19 categories of Info vo
nuclear reactor fvents k saFetu problem Foi-wards documents
llstaa in App A Document* In rtpp D complote 1 a withheld (ref
FOIA Sierantlon 9) ,
FtLTOH, J H Division of F!uli and Httord* H3/O7/I2 UDELL, R rt
CTiftical Mass Energy Project 9pp 15663 097 24X
Fiche 50-O
--0aiOOS0051 Forwards Gsnaral PutHc Utils 020*07 Ncuif (loltase 43-
discussing sutpBitorf cause of TMI-1 *t""i fenerator tube
degradation prnh l4n fc prDpaed repairs Repair* estimated
to DC completed bij act 1982
MAJOR, ft ACRB - AiCvl.stiry Committee an Reactor Baf()uardi
63/04/20 KDECLERtD W ACRS - Adylsorij Committee on Reactor
Safeguard* SpP 15665 157 24* FlchB 50-000, &2/07/1S,
9210030015
U2I0270-)10 summary of ACR3 Sifbtomniittee on He tal Component! 620407
moBtino tn Palo Alto.CA re status of Steam 0nar*tor
ouinert group progT^m & THI-l iteam generatDr problimt t-
mods
* ACttS -~ Advisory Camffllttee an Reactor Ssft9uar<ll 85/08/11
ACRB - Advisory Comml tt*e on Reactor Safeguards 9pp 15B33 2A
S^X FichB 50-289, 33/OFJ/ 1 1 , B210E70410
licence stag* document! fc coTr*ipcindBnct
iift-lj evaluation ra mad
d to inadvertent
' o*s of
mntalian pauir
MICHL30tg,C Dlrctor'
B1071B047B FoMjjrdi safoty val"ation re mod to correct ln*dvirlF I
opening of tnai|iheric dump valvas on DWR plant* during Jell
of initrum*nt control iy non-nuclear initTumentatlon
paiuer
OaWSTEfH.H Director'* Office 81/09/04 MICJtEiLenn. C
Director'* Office 2pp 1373O B30 B4X Flche 50-000, B3/0*'*!
sal oo 10008
Addl response to FOIA rsquast for 19 cHttgorlti ct k r Ft n
nuclear rejctor eventi fc safety problem* Foruiirdt dccuntnli
Hsteri in rtpp A Documents tn App H completely niltNhtld lr*t
FOIA Eiamptton 5>
FELTDN, J M DlvUlon of Rules and Record* 02/07/12 V[il I- *
Critical Masi Enerjy Project 9pn 1 5663 > 02? 34!(
Fich* 50-000. B2/07/12.02100B001 5
9304300536 Foruirdi std order for DDE work "Eva 1 mtl an of T11-1 ''j
Oeflerotur Corroion "
VDLLMER.fi H. Division of Engineering. FIN n-?3(jfl QlSfH/:-3
FRMLINO,A Enerny. Oept of 2pp 15463,137 B*
Fichi 50-000, 62/07/12(0310080015
Bao-l?0014a Btd order for DOE work' "Evaluation of IMI I tin** in""",
CorrDiJun." Isiued to BNWL
VOULMER.R H Division of Engineering FIN D -3504 y W.O*' *
Ip ISAiS 13B 3-VX Fiche SO-000, 08/07/1 a.
-QP04290237 Di icu)s info available re unit fleam gent'* tar t Tr,
reptst itatui updates ti notebooks Of Info on tuh
f atrrica tloh , identl f icat Ion b operating history tut I W/<J
KOVAK. T H Atsiitant Director for Licensing 03/04/01
EISENHUT, D Division of Licensing app ISjbiB 3JI 7*1
Fiche &0-000,fl2/07/12.B210000015
-8303230533 Hecomnendfl formal revieui of fac i 1 1 ti| stain fenirit,r
corrosion problem, Detsi led Jlscuirton of ratianalt for
request Bite 1
JOHN S TON, H V Anistant Director for Mator-lal* I, U-jillfiH l*t '
Engineerini 32/09/19 NQvAK. T Asilvtant Director ar C(i'<-
Reactnrs Spp 13669' 146 24X Fiche, 90-000.1
eaOfiI40339 Dlicuisii facility iteam sontfrator- tube nv(* i *>i-J<
liconiae to- diicuo details of procedures In bt follovtt
proposed NftC mill develop complimentary i nit>peni)ir>t pncfrj*
Intend'ed to verify repair pracai.
MOVAW. f H Assistant Director for Operating llMdcri Gltto .<
E1BENHUT. D Division of Licensing 2pp iSfcfcJ JS? ***
Flchi SO-000. BS/07/12,B21(X)BOOlg,
B20f>2906i6 Defines Div of Englnaarlnfl reppnlbl I liln fc ifiit'Nn
tisure efficient d high quality revteu of llctnitt p*cp**el
for rpairtna Tfll teem generator tube,
VDLLMERjR H Divltlon of Enj)lne.>rtng B2/06/H
Atslttant Director for Materials !> Qual iMotlans
KN1OHT. J P Assistant Director for Compo nenll h (UnU'l
Englnaarlng. Spp 19666. 132. 24X Flch* BO-000. ift)Jt\ t
B5IOOQ0019,
Foruards std order for DDE uiorki "Evolunli
Qtntraiofi " (nud to BNWL period of ferformmct u
to 921015 U/na ddl cott U NRC
VDULMER.R, H, Diviiion of Engineering, FIN 8-2306
FREMLIN0.A En*rgy> D.pt, of. lp.
FUH- Ho-ooo, 82/07/12, aaioosoois
B21403007& gtd order for DDE work "Evaluation of 1HJ I
Oeneraton " IssUld to BNWL,
VDULHER.H.H. Diviion of Enfllneering. PIN H-3M6 3
lp 1S666.IB1, 24 X Fiche: SO-000, 02/07/lS, B3100WWI9
of dacumanti re
I2/06/2S (JDELU.fi. A
19 24X
HJ
ffacommendi approval of deferral of l|l*flinliH*=i ft
WfiEQ-0737, Items II B 3. II F, 1. 4, II F 1.3 & II F I <& vMll
63O33J or b*for restart. Approval of Item II B B 3 IJiUvlJ
be ufthfield until revleui completion,
DIRCKS-U J. Office of the Executive Director for Dir*l|f
7pp 15624033, 24 X Flcht M-B99.Da/0*y li.fej t Xs.
6210050920 Inform* that Commit* Ion y{ll be brlffid n H
rteomniBndationt re reitrt certification In Mr Eijl j,^j
prior to Commission decision on ef f ectivontll of <MilB
Initial dicltlon,
DIRCKBrH J. Office of the ElKcutive Director far Oj4Ml B ,
02/03/IX PAUAD1NO.W. J Cummittionir*, lp
Fleht.SO-299,B2/09/16,fl21003030A
ng re reactor yatar lavoX
tv to mil
iquireunnti for
ICHELBON.C Dii-etor'
t, aa/06/2S. 92100 1 QQQB
BZ10050336 Inform* that package re facility rimrl i% n (
Ccnnliiftfi for approval of change in MUREQ-0737 f|lt II
boron precipitation problem affect* confarfftnce
w/regulafctonii deferral amount* to exemption
HCIMTQ.J Office of the Eieeutlv* L*oa] Olrfciar
EI6ENHUT,D. 0, DivI.iOn of Llcenitng 4pp.
Fi<h: 80-289- 82/0^/U. B210030306
DOCKETED ITEMS
99
B20705GG4O Requests NUREQ-0737 requirement deferrals be addressed as
outlined In Commission 010335 order Paper distunes staff
plant far certifying completion of restart requirements on
5ECY-B2-230 t. describes approach to be taken on NUREG-0737
PALLABINO. N J Commissioners B2/O7/27 DIRCKS, W J Office of
the Eiecutive Director for Operations Ip Available at NRC
lire 15624 043 24 X Flche 50-209, 82/09/ 16, S2100505Ofi
9210130548 Forwards Rctvition 1 to "TMI-1 Bteam Oanerator Repair Safety
Evaluation, " submitted on B2Q82O at suppl to LER 91-13
Revision* tfo not affoct previous conclusion! Hnvislon
withheld (ref 10CFR2 790>
HUKILL.H D Oeneral Public Utilities - BPU Service Corp. B2/1Q/O5
EISENHUT.D 8 Division of Licensing Ip 13494 195 24X
Fiche 50-289, 62/10/05.6210130540
8310210503 Provide* Commission id/status of implementation of NUHEO-0737
requirements on tMI-1 Recommend s deferral of Implementation
dates lor MUREQ-0737, Item* II D 3, 1 1 F 1 4, 1 1 F 1 3 &
11 F 1 i until 830331 or before restart
DJRCKS.U J Office of the Eiecutive Director for Operations
5ECV-BS-3B4 02/09/16 14pp 1 57B3 283 SAX Fiche 50-2B9,
02/09/14.. 9210210503
821029014.2 Not! f (cation of date c Jiang e for 921018-19 noebings ui/ifHl t.
consultants in Getheedi. MD to d iscuss remits of it cam
generator repair qua 1 i f 1 cot ion progr m. ed du current te-sting
program & RGB cleaning
JACOBS. H H Operating Ruactors Branch 4 S2/1O/05- BTOLZ, J F
Operating Reactors Branch 4 Ip 15Q7A 329 4)!
Fiche 30-29^fi2/10/OS. 6210270163
821OOE0113 raruards outline of Phase 1 ventilation separation program
to mart short-term intent of ASLD 811214 order Program
completed ! s ij j turned over to plant operations Further
detail* discussed in restart rept, Suppl 1, Part 2
KIMILL..H D General Public Utilities - GPU Service Corp 82/09/29
SFOLZ.J F Operating Reactors Branch 4 4pp 1S6O3 257 24X
Fiche 50-2B9. 82/09/29,8310030113
6MQQ5019i Forwards table listing 96 emergency feeduater sgs/ln strument
air valves as suppi to 320714 1 tr valves structurally t,
operationally adequate during SSE stresses & normal loads
HUKILL.H Oeneral Public Utilities - GPU Service Corp
STDLZ.J F Operating Reactors Branch 4 2pp 15&09 292
Fiche 50-289.02/09/29,8210050196
82/09/29
2 -IX
S21QO70372 Advises that util has contracted ui/Elec tronic Asoc i ates, Inc
for basic principles trainer Contracted date of delivery is
Dec t<9B2
HUKILL.H Oeneral Public Utilities - GPU Service Corp B2/09/29
SrOLZ.J F Operating Reactors Branch 4 Ip 15633 317 SIX
FicUe 50-299.82/07/29,8210070372
B2I01E0043 Notification at 82IO13-14 meeting ui/PNL, OHNL. Frank 1 i n
Researth Ctr. OH State t util In Bethesda, MD to review status
of steam generator recovery program
JACCmB.R H Operating Reactor* Branch 4 02/09/29 STOL7- J F
Operating Reactors Branch 4 2pp 15499 205 24X
Fiche 50-28-?. 92/09/39.8210120043
B2IOI3Q20a Forward i application to amend License DPR-50 consisting of
Tech Spec Change Request UBideletlng rtpp B Tech Speci
HUKILL.H D Oeneral Public Utilities - GPU Service Corp 83/09/30
STOLZ. J F Operating Reactors Branch 4 Ip 15674 127 24 X
Fiche 50-289. 82/07/30. B2I0130206
3210270342 Clarifies request far addl info re TM! I Urn It B 3, "Poxt-
Accldent Sampling Sys "
STOLZ, J F Operating Reactors Branch 4. 82/1O/07 MJK1LL, H D
General Public Utilities - CPU Service Corp 5pp 13931 319. 34X
Flche SO-HB9. 92/10/07- S21027034B
92102203:49 Staff requirement! mamo re BS1OO& briefing on ttatui of
certification of licet! see compliance m/reitart requirement*
CKILK. 3 J Office of the Efrcretaru of the Commnsitn S2/10/12
Office of the Beere&ary of the Commi talon Ip 15766 210 3*X
Fiche SO-E09, 92/10/12,0210220349
821O25Q092 Faruirdi operational DA plan far facilltiei
FIEDLER, P B Oeneral Public Utilities - SPU Service Corp B2/10/13
CHUTCHFIELD. D Operating Reactor) Branch 9 2pp 13792 265 24 K
Fiche BO-000, Ba/10/12, BS1D250092
8210250097 Operational OA plan for facilities
KAYANAS.W C , LONO, R L , HLIKtLL.H D Ooneral Public Utilitios -
OPU Service Oprp IOOO-PLM-7BOO Ol ROO B2/O9/O1 ISOpp
I57TO 26? 24X Fiche 80-000^02/10/12,9210250093
aaiO270QS Forwards docirments to be placed in PDR. Documents respond to
NRDC b Sierra Club 820917 third request far production of
documents b Sierra Club 37th et of Interrogator lei,
SHEENEV.MF Offics itf the E*ecuiive Legal Director B3/iQ/33
SCOTTiS Document Management Branch 4pp, 15G19 092 24 X
Fiche 3O-000. 93/10/SS. 821O27O01 9
6210270020 "Greater Commitment Needed to Solve Continuing Problems a
TMIj " rept to CongveiH
* QBrieral Accounting Office, EHD-91-106 Bl /OB/26 122pj>
18810-096 24X Fiche' BO-OOO, aa/ 10/82. B21 0370013
-821OI3O21O Application to amend License DPR-50 consisting of Tech Bpnc
Change Request HBrdeletlng App D Tech Specs Justification
enct
HUKILL.H D Oeneral Public Utilities - OPU Service Corn
62/O9/30 3pp 15674 128 24X Fiche 50-2B9, S2/09/30i B210 13020i
Foruard* "AssB*sment of Selected TMI-1 Training PTogramSj"
Vol I Rcpt concludes that util has made significant progress
In past 3 yri to expand TMI training capability & to improve
quality of training programs
ARNDLD.R C Oeneral Public Utilities - OPU Service Carp B2/10/OI,
OENFON, H R Office of Nuclear Reactor Regulation. Director Ip
O20 24X Fiche 30-289, B2/10/01 , B210060342
B51O290204 Foruards summary itatui rept for item* needing NRC
certification prior to restart. per 7 90S 09 order tt notCc* of
hearing. Date of equlvalant timing for verification ulll ha
provided in future statu* aummaries
AHNOLOiR C Oenral Public Utilities - OPU Service Corp
DEN TON. H R Off Us o-F Nuclear Reactor fUgulatian. Director 3pf
19B53 293 K4X Fiche 3O-287, BZ/lO/SEli 8210290ZO4
Inspection report*. IE Bulletins b c orreipondenca
B2100B0015 Addl response to FOIA request far 17 categories of info re
-821006G3'S "Assessment of Selected TMI-1 Training Programs," Vol 1
v Data Deitgn Laboratories 82/09/10 301pp 15A18 021 24X
Fiche 50-289,82/10/01, 8210060342
9210030043 Foruards status rept re procurement b installation of
replica ilmu 1 atop, per B20B27 mg t piping fc instrumental ion
diagrams Second status rept mill be provided in Oct 1993
HUKILL.H D Oeneral Public Utilities - OPU Service Corp B2/10/04
STQLZ<J F Operating Reactors Branch 4 3pp 19643 281 24X
Fich 50-239,82/10/04,8210080043
331(30003 OB Poruarifs first status rtpt re procurement t. installation of
replic* simulator for TMI-l.per requirements of Paragraph
593 (3) of 610827 mgt P1D Next status rept mill be provided
in Oct 1983
HUKILL.H D general Public Utilities - OPU Service Corp B2/10/04.
STTJLZrJ F, Operating Reaction Branch 4 3pp 15A3fl'044 E4X
Fiche 50-269. 82/10/04. 82100B030B
S31013024S Advises of dairij farm located appro* 1.1 mile* east of TMI
yielding dose commitment greater than six of seven present
milk sampling stations Results of land census to be included
In 030301 annual radiological environ operating rept
HUX1LL.H D Qeneral Public Utilities - OPU Service Corp B2/10/04,
HAVNES.fi C Region 1, Office of Director Ip 1S676 OOS SIX
Rich* 30-2B9i 92/10/O4, BZ1013024B
100
DOCKETED ITEMS
621013032! ForwiMl* IE Insp Rep-t 50-299/62-13 on BBQBOB-05. 31 6
09(31-03 Ho noncompJ Jnce noted
STAROSTECKI.R Division of Project t, Rutdent Pi-oormt S2/ ID/01
HLJUILL.H D Oeri*r*l Public Iftilitlei - CPU Servlet Corp 2p?
18703 ZIB 24X FUhe 50-2S9. B2-/ 10/01. 82101.S022I
--S210070135 Btvil rept input re Qinna B201S5 steain atngTat
ruptur. event NRC loth monthlg status rept t Cenri
THt-l restart end sre*
* MSC - No Detailed Affiliation Given 82/03/11 3 OB
IS645 IKS 24X Fiche 90-000, 82/OS/ 10,6310070007
In.
8210130232 IE line- Rp t 50-289 /Sa-V3 on 92OBOB-05, 31 t> 0901-03
Mo noncomnl iance noted Major areas Inspected actions an
pi-flout Into f Indln9i> rrac tor blilg flood ltv*l limitations
plant shielding daiign revleu b restart modl-lnipletnentatiQn
HAVERHAMP, D , EflPEN. P . FABftNQ, A Division of Project t Resident
Program 92/10/01 BOpp 15709 314 34V Flehe 50-239.93/10/01,
3210130221
6210130202 Clarifies poiition re Action 4 of IE Bulletin 77-21, "Temp
Effecti on Ltvl Hiasurefflents " [tieluiion of tablet, curvet
or curl-action fact on in omergeneij praodurei will
unntt Kir i IY com plicate procedure*
HUH ILL. H D General Public Uti 11 tin - flPU Sir vice Carp 02 / 10/04
HAVWE3, R.C Region 1, Office of Director S f p 15701 334. 24 X
Fithe 80-239. 92/10/04, 8210IS02Q2
82 mi 50076 Notifies that 820929 IE Imp Rent 50-aB9/B2-V4 un tubmitteiJ
u/Brroneou* Imp Ript Number B2-12
STAROSTECWI.R Civilian of Praject t, Rt*itfnt Projrarm ea/10/OS
HUK.ILL,H D Oanirnit Public Utllitlit - OPU Sirvici Corp lo
13696 339 34X Fie h e, 30-237, BS/10/OS. B2101 50076
B2102604 1 ? 1 ? Poruarili Rvlinn 1 to "Efflutnt !, Haiti DitODt*!
Semiannual Repti Jan-June I1B2 " Revision reflocti change in
F-SS batch mode 'or jacond quarter
HUILL,H B CJeniral Public Utilifciet - GPU Service Corn fi>n-
HAVWES.S C Region I, Offlc. of Director In IBGOA \ -,,. ,,,
Fisht 50-S39. B2/IO/1S, 831Q36QW} '
921034,0605 ReviliOn I to "Effluent & Waite Di*po,,1 Seml.nnuili
Jan-./un 1902 " *r,nujr t f
* Gsitirtl Public Uttlltttt - OPU Service Corp B2/IG/15 ,
ISQOi 137 24X Fiche 30-2B9, Q2/1O/ IS, 631 024,0199 '
S ReportAbl* occurrinoir LERt t r*lated corre*pondtnc
UML1 t
a pond, to FDIA r E o.uet for 19 ctegon, o f
nuclear i-*etor ivents fc liifttij ppohlemi ForiuaTdt dnEu
lUted In App ft o EU
FELTCM. J M Division oF Rulei and Recordt B3VQ&/3Q
Critical Wn Energy Project I5pp 1572? OOfl B4X
Fie hi 30-000-8a/06/aB,B2100IQOOB
9210150083 Forwanji IE Imp Rept 50-2B9/ea-14 nn BaOB07-007 No
nunc omp Hinct noted.
BTAH03TECI,B Division at Projict bRxldint Prosrami 02/09/S9
HUKIUL.H D, Oenaral Public UtUltlit - OPU Btrvict Corp 2pp
^10 a Fich*'30-289,SZ/10/OS.Bai0150074
B210150091 IE Imp Rept 30-289/32-14 on 8SQB07-0907 Ho noncomplianee
noted Major *reai ini|iitt*(I plant opfrafciom Including, itiam
aenerator rtp-alrl It restii-t nods
CONTE, R j VQUHO.F , F AS AN 0. ft Division of Project Si Resident
Pro.]ram S3/09/2t ipp IStfi 342 24X Fich 30-SB9, 92/10/03,
0310130074
B2 10210052 Faruardl IE Imp Ript 50-269/82-111 on BB0907-10 Mo
noncompl lance notrd
MARTINET T Division of Enolnetrlnu t Tehni<*l Pi'oprJmi S2/ltW03
HMAtLU.H D 0ns-al T-jtlic Utilities - OPU Sirvkt Corp Bop
15762 018 24X Fichs' 50-289. B2/10/03iS210210U52
RBcommBnda compreheniive antia ra ent of plajit agr*t,
condition* to determine specific predetermined tiff,* re3tttl
nquences of occurrsnce to emeroency husei SRP ihojjd b
rvsEo" r detign feature*
ASHE.F Director's Office, 01/10/16 MJCHELSQN.C
Office 4pp 15731 04? B4X Flche &0-000.
Qlr
S210130SIS Foruardi LEU B3-013/03L-0
HUKILL.H G Central Public Utilities - OPU Service COT-* H -
HAYNES, R C Region 1, Office of Director In (BARS aw .*
Fiche SO-aB7, 82/07/29,631013031 S * "
-BE1G130S26 LEU 92-013/Q3L-0 on B20H30, plant of Fluent r*dj.*,t
(RM-L-7J had no sample flow Caused bij open braaker on iHtt} f
pufnp BR-P-1 Breaker closei] Operator survelllanie pr^are*
continued to ensure proper tloui
Oenerel Public Utilities - OPU OTV*C. CDJJ
egion 1. Office of Director 2nc I3/f\a an
8TEPHEN90N! C J
Flchf , 50-239, 82/09/29,881013031 5
B21021005& IE Imp Rgpt 50-269/62-16 on Q20907-10 No nancomn llancW
noted Major areas Inspectid Ucensie action re THI Item
I C 7 on feedback of opiratlng experience b Item 1 C 6 on
verification of testing It n*tnt *ctlyiHis
HEVR.O M i CAPHTON, D. L Blvlsion of Enjinearinj t. TecfcnicaJ
Proframi 82/07/39 6p[> 18762 020 H4X Ftehe' 10-2B9J B2/1Q/O5,
8210210092
B210070345 PhfD-THI-B2-020 on Q2100B- game poai hr ippr* htnait
prnpertu d turned over to state police k 0m Commit,* joii No
vital ras threateneJ Security increased Litins ut I I
WIEBE.O , BELLrtMYrR Region 1, Office of Director
30& 34X Flch* 30~289, B2/10/06, 8210070269
B20S190233 IE Info NotH:* 80-33, Buppl I, >'L*kir B (, Dltlodj|d 1-125
Implant Seed*. " Bvc list encl.
CQB3, 1, r Division of Fuel Facilities, Materials t Safeguards
82/IO/0& Conlolidetkd Edlion Co af Htu Yorl ifcpn 15741,390
S4iC Fit(i 50-000,
IE Bulletin 62-03, "atnsi Corrosion Creekino lh Thick-
WalljLai-ne-DlannteriStainUst Steel, Reclrculatlan Syi
Piping *t BMR Plants " Svc list encl
OEVOVMO.R C D(retcr'i Office. Office of Impec tlmt and
Fnforcament B2/10/14. Consolidated Edion Co &f Htu York.
nspp isato.ias B4.X Fiche so-ooo, 92/10/14,8200170233
S2H3a<?OOii8 Fopyr-d IE Insp Hept 50-839/65-10 an B20920-24 No
noncompl lance no ted.
H 5fJI, N : T ,, T ;, Dltfillon of Enilnitring i. Tichnltal Progr*ni, 92/10/13
HUhlLL.H D. general Public; Otllltlei - OPU Service COT>O 2pp
13983,342, 24X FicKe SO-2B9, B2/10/1S, B210S9006B
6210290072 IE I n sp fl.pt 80-289/83-18 or, 820980-2* H noncftmp Hanee
notd riajftp areas [nipec tta- licensii action on prtviom
in*p Itent, prmce-ifuree t, repreientaUve record* & Intel-view*
ir/per tunnel
HMW.r , MrtPyOA.fl , CrtPHrON, D L, Division of Englnetrlng t,
Ttchnical Program Ba/10/OB Iftpo 13933 344 34*
Ficti* 50-289, B2/10/lS,aai029006
R __Pf'oJ ( -= "r6ing ripc-rfc* tt rtUted corripandenc.e
8210070007 Ritpondi to FOM qii*st for fight cetegorUs of r.c orot re
""i n : ?i'" n 1 ' ***f" *wk*"-*PP * Joeum.nt, erovidtil
FOIA Hi^uetb 81-313, Forward, < CLi n t, lit.d In
ft
B
, Division of FUjl,, , n(t ft
Wlnthtop, atieiion, Potnm ii Ottberts.
Fiche- BO-000, BS/&B/10, Sai0070007
9pn
62/08/10-
LOriO, 0,
S4S
B2102604B3 PNO-1-B2-047 on 631022, k Intt U einanel
rou of tubei i n D once-through steam generator
involves controllerf detonation within tube Horn*
attention eipectod
CONIE.R , UeiHIO.R , BTAHOBTecKI.R Region 1.
83/10/22 If, 13B06 233 84X Flchi 90-2B9.
cond ur t,j.i
c * Sll ,
, B2IMI*
T Hearing trinstrlpts on non-*nti trust mattari
8210130075 Foruiei-di Commission determination statement uttktiH
tranecrtpt of B20910 restert proceeding "
CHICK. B J Office of the Becret*rg of tha Commission S3'
Public Oocuinint Branch to |3i<?6 250, 84X Flcht -sb-seS.K
0210130007 Commission determination ul thhul dida tr*nterl.L 4
Commision B20910 dltcutilon of Contested Uiu i i n rl ,,tir
proceedlnj "'*'
CHIUK.B J Office of the Secretary of the Coi*|ei er F3
If 19i.94iasi 24X Fiche SO-B89, S2/09/3B, BB10I 3>Jo75
B210a70tB8 Trantcrlpt of 82100A public meeting re tt*t ut * 1
cerfctjlcation an licensee compliance u/ratft raulr. H i:
on THI-l in HMhinaton.DC.Pp 1-34 MiWMn
* CafumUilonerl B3/10/06 34pp 1UB3B 276 3*y
FUh.&0-aa9, 83/10/06.8210270100,
6210210420 Forwards transcript of Commlision 831&J4 nt ,,. t
ve.isl ui*t*r level indicator program Comnrntt holrf b,
iiibmittta ni| B211Q1
CHILK.B J. Office of th* 8ecretar V at tb> Cem.i.J-ft '
Off le*> of the Executive Legal Director, |p, 157A? ? 3 J
Flehe.BO-aa9.B2/10/lB.B21oai0428 *
DOCKETED ITEMS
101
H2LO21O434 Transcript of 821014 public meeting in Wash ing ton, DC Pp
1-91 Vieugrapha re request For NJ?C approval of
rpcannendat ions for implementation of NUREG-0737, I tern II F 2
end
< Commiss i oners B2/ 10/1-1 91 PP 15763 273 34 X
Fuhe 50-269,82/10/15 5210210130
.^ET 50-E93 PILGRIM NUCLEAR POWER STATION, UNIT i
Operating license stage documents >< correspondence
S-1009C015 Addl response to FOIA request for 19 categories of infn r
nuclear r*actgr events i satety problems Foruiards documents
Intod in ftpp rt Documents in Afl p H completely withheld: (ref
FQIA Eiemjitian 5)
FELTDIJ, J M Division of Rules and Retards 62/07/12 UDELL. R A
Critical Mass Energy Project 9pp 15665 027 24X
Fiche 5O-O30 ea/O7/13,82lOOBOOl5
Forwards "Engineering Evaluation of Salt Svc Mater iit|s Fir
Blockage at Pilgrim Nuclear Pouer Station bi; Blue Mussels
fflytilus d 1 1 us ) " Further rec ommen da ti on s re sy s fduling by
aquatic organism! not needed
JMBRO.E V mrector 5 Office B2/O3/1B rUCHELSQN, C Dlrettor'
Office 2pp 15h66 073 24* Fiche 5O-OOO, B2/O7/12, B2I008001 3
Engineering Evaluation at Bait Svc Watar Syi Flou Ulockaoe
at Pilgrim \uclear Pouer Station by Dluc Mussels <Mutllu5
Ed t I us) "
JMGRQ.E I' Director's Office 82/03/31 Mpp 15666 075 24X
Fiche 50-000, 02/07/12, 8210080015
- -USO5I3Q-I 1 1 Advises that engineering evaluation of saltwater sys 1 1 oui
h-locka^e liu blue mussels indicates surveillanco lequircments
in fet A Specs are not sufficient to demonstrate sys
aperab i I i ty
IKHELSCIN, C Director's Office 82/05/06 DENTQH, H It Office of
Nuclear Reactor Regulation, Director 3pp 15666 O70 24X
riche 50-000, 82/07/13.621 OOBOO 15
Q Inspection reports. IE Bulletins Z< c o-rresp ondenc-e
8204160212 Respond! to tJRC 9201 IS notice of violation b proposed
impD*ition of civil penalties Corrective actions containment
atrrvoipher ic control aya made fullij operable on B1O6O3 &
procedure re por Formance of analyses being reviewed
STASZESKY.F H Boston Edison Co B3/Q3/19 DEYDUN3, R C
Director's Office, Office of Inspection and Enforcement llpp
ISAM 275 24X Fiche) SO-293, B2/O3/1 1 ?, S2O4 1 60213
6304160323 Foruiards performance improvement program in response to
NRC 8S011B order modifying 1 I c ense. effec 1 1 ve imrne-d ia te lij
Program details IB to 2'3-month nerioil that mill result
HARRINGTON, H DJ Qastt
I, Office of Director
82/03/19, B201160313
Edison Co S2/O3/1B HAVNES, Fl C HE
3pp 15611 2B4 24X Fiche 5O-293,
8204160225 "Performance Improvement Plan
* Boston Edison Co 32/OD/OB I6pp
Fiche 50-293, 32/03/19, 820-1160212
15611 2B7
B51OOBOO15 Addl responae to FOIA request far 19 categories of Info re
nuclear reactor events 6 safety problems Foruards documents
luted in App rt Documents in Ap p 3 completely withheld fref
FQIA Exemption S)
FEUTON,J M Division of Rules and Records 83/07/12 UDELL. R A
Critical Mass Energy Project <?.pp 15665 O27 24X
Flcho 50-000, B2/O7/13, B2100aoO15
performance notes
tOpp
Systematic: assessment of licen
facility evaluation for Aug-Oec I960
^ NRC - No Detailed Affiliation Given 80/13/31
154,68 025 34X Fiche 50-OOO, 82/Q7J 13. 931 00300 I &
8210070377 ForiuaTfls IE Insp Rept 5O-293/32-33 nn B20B17-2O No
none emp 1 ianca noted
MftfmN, T T Division of Ensineenng < Technical Programs B3/Q9/2S
HARRINOTDN.H D Boston Edison Co 2po I5&31 162 SIX
Fiche 50-293. B2/09/22. B21 OO7O277
Application For Proposed Change 82-11 to License DP
c Ft a ft g i n>g Tecfi Speca 1 7 D I d 3 7 D 2 to permit operation
in ! betuaen reactor nodes Linen isolation valve is
inoperable
nAfiftlllOTQW, W D Goston Edl5on Co S2/O9/30 VASBALLO, D u
Operating Reactors Branch 2 2up 15615 044 24 X
Firhe 5O -2v3. 82/09/30, B21O0600SO
8210.070283 IE Insp Rept 50-293/63-23 on B20817-2D No noncnmp Uanco
noted Major areas inspected licensee action on previous Insp
f inding. f ol louup on IE Dulletin Bl-Ot surve 1 1 lane e of
mechanical snub&crs & Cycle 6 p ost-pefuc I Ing startup tests
PETHONE.C D BETTENFmUSEN, L Region J, Office of Director
H2/09/09 7pp. I5i34 16-t 24X Fiche 50-293, 02/09/32, a?1007O277
Proposed changes to Tech Specs 37DI&37D3 alloiuing
aporation in ! oetueen reactor mode luhen isolation valve IB
inoperable b satlsFijing CDnditions for primary containment
integrity
a fltston Ediion Co B2/09/30 lp 1561S 046 21X
FK h f- 50-293, 82/09/30, 8210060080
6210010373 Confirm* licensee actions taken in response to Revision 1 of
performance improvement program discussed during 620924 mg t
meeting Summary of areas needing clarification or
corrvc tlons Bnc I
HAYNES.R C Region 1. OFfite of Director B2/OW37
HARRINQTON.y D Eos ton Edison CD 3pp 15573 097 24X
Flthe 50-293,132/09/27.0310010373
riO150144 Requests extension to submit Hark I containment program
plant-unique analysis Delay due to need for eitensivu QA
verification not previously Identified by Teledyne Corp
t-artlSI.A V Boston Edison Co 82/10/03 VrtSBALLO, D D Operating
Reactors Branch 2 lp 15705 005 24X Flclie 50-293, 92/10/OB.
G21Q1SO144
82I015DQ01 Foruards IE Insp Rept 80-393/32-22 on BBOB02-09Q6 1- notice
o* violation
STrtftOSTECKIiR Division of Proje-ct Jr Resident Programs 83/09/20
HARRINGTON, W p Doston Edison Co- &pp 1 567> 295 24X
Fiche 50-H93- B2/0=?/2e. B21O1 5OOO I
5210E20015 Concurs u/LLL evaluation of util 330617 submittal re
degraded protection for Class IE power sija Mods, procedures,
operating restrictions i voltage schedules will ensure that
Class IE equipment will nut be exposed to degraded voltage
^AESflLLD. D G Operating Reactors Branch 2 82/10/08 MORIS!, A V
3c* tori Edison Co 2pp 13786 226 24X Fiche 50-293.82/10/08,
821O230QI5
821O22OG17 Safety evaluation supporting licensee conclusion that aditl
protection not required for unit aunltary trans former pouier
source to -Class IE buses
FfiEVATTE.R Operating Reactors Branch Z 82/iO/QB 4pp
1S7O6 32B 24X Fiche 50-293,82/10/08.8310320015
6209130461 "Technical Evaluation Rept (Revision I) on Proposed Design
Mods & Tech Spec Changes on Orid voltage Degradation for
Pilgrim Nuclear Power Stati on, Ifni t I "
SELAH-J C Laurence Uvermore Laboratory FIN A-QS9O UCID-1B6B9
RO-1 B2/OB/3Q WRC - No Detailed Affiliation Oiven 13pp
1978A 332 24X Fiche 50-293, 82/10/OB,
8aiO35QO35 Forwards filino fee for 830930 proposed Tech Spec Change
B2-1J
MORISr,A V Boston Ediion Co 82/10/15 VA8SALLO, D D Operating
Re-actors Branch 2 lp 15787 07S 24X Fiche 50-293,92/10/19.
6S1O2SOOB5
-B21OIS0003 Notica of violation from imp on B3OB02-07O&
* Division op Project & Resident Programs B2/Q9/33
2B7 24X Fiche 30-E73, BZ/Qt/38. B2I01 30001
B2 101 5001 7 IE Irtsp Rept 5Q-EV3/B3-2S on 520603-0906 Noncomp lUnco
no'ted failure to notify NRC iwlthin 1-h nf raactor scpam
I- to perform leak rat* test required bij liiniCing ccndltiono
for operation fur inoperable alarm sys
JOHNSON.J , EICHENHOLZ, H , ELSASBER, T Division of Project &
Resident Programs 83/09/22 2Opp 13696 2B9 24 X
Ftche 50-293, 82/09/30, B310I500O1
B2100501i6 Forwards response to reque-st for further Info re IE Bulletin
80-11 "Ma -sorry Ufl 1 1 Design " Issues discussed Include sliear
itri-** far- safety-related shear wal 1 i, t) loclc pul louts, use of
Branson f ormu 1*. masonry mall cr-ac*s d allouiable tension
MORISI.A V Boston Edison Co 82/09/29 VASSALLO, D B Operating
Re-actors Branch Z Bpp 1960S 114. 24X Ficha 90-293,82/09/29.
02 10050 166
621C06Q15Q Act receipt of 920BO& t: H7 1 trs informing NRC of steps taken
to correct violations noted in 1C Insp Rept 5Q-2?3/B2-lS
8TAROSTECKI,R Division of Project b Resident ^ragr^ms. 83/09/30
HARRINOTON.H D, Boston Edison Co lp 15613 OBI 24X
Fiche 50-293, B2/O9/3O, B2I006OI50
102
DOCKETED ITEMS
~aaiQ060U4 He, ponds to NRC 0S07O7 ler re violations noted in IE Inap
Jlept 50-393/62-12 Corrective action* draft trainina plan
written, interim administrative controls re Tetb Specs
l ^;S5T^?V P "S"!?-n P E2"i"" tl /w?K -m !TEC!. R
Division of Project fc Resident Programs 2pp 15615 063 34*
Fithie 30-293, a2/0 1 ?/30,B2100it>ISO
6210060160 Respond* 'o WC S2O707 1U re violation* noted in IE Insp
Rapt 50-293/92-13 Corrective action! addl operator training
iinplerriscit-etf 6 reactor uattr level dlvaroenc* iisue
incorporated into opSiator requal i f I cation pn
Division of Project * Resident Programs 4pp
Fiche 50-293.62/09/30.8210060150
B210220521 Notification of 031005 meeting u/fti! in King of Prussia. PA
to discus) licensee response to MftC order
ELSASSEfi.T Division Of Project !. Resident Program* 92/09/30
DIHCKS.W J Office of He Eiecutive Director for Operations
DFVOijrJG.R C Director's Office. Office of Inspection and
Enforcement MURRAV, J P Office of the Enecntive Lejal Qirector
lp 157FJ4. 076 24* Ftthe 50-273, 82/09/30, 82*0220321
a2081'50233 IE Info Notice SO-35, Suppl 1. "Leaking t Dislodged I-I3S
Implant Setrti " Svt lut ntl
CCJIIB.L 1 Divl.lon of Fuel FiclliUii. "*"; fc j"""'twt 33O
B2/10/06 Consolidated tdi*on Co of flew Yard *>6pp 19761 -t3B
2AX Fielie SO-000'6a/10/O6, 8209190233
8310170731 Corapletfs respons* to IE Bulletin 30-04, "ESF fleset
Controls " Revieu Of action,!, taken in compliance afoul Jet In.
rovvaled daficiancies In Temporarij Procndure Bl~l,!\ re valv
totting Ntu teit pt-ocenjurei developeil
MOFUBI.A f Boston Ednon CD GS/IO^O? HASHES, B C Rejion I.
Office of Director 2pp 15736 310 24X Fiche 90-293,83/10/07,
9210190721
8310290275 Forurd IE Irup RP* 5-?93/02-S5 on 020914-17 Mn
nancornp 1 1 ance noted
fttffTIH, f I" Division of Engineering ft Technical Program Qa/lO/lj
HARRIM3TDM-W D Boston Edison Co Ppp i 5QS4 059 34X
Fieh 30-293,93/10/13,8210290275
0210390280 IE In*? Bepfc 50-293/B2-25 on 030914-17 No noncompl lane e
noted Major araai inspected inaervlce inp prosrain d drauisng
control, 1 icenie action on previous Inirj findings t Licensee
rttpons* to IE bulletinc
KCBRtARTV.R A DUilR. J C Division of Engineering ! Tethnlcal
Program* B2/10/05 4pp 13BS4 Oftl B4K Fiche 50-293,62/10/13.
931Q29&375
BS09190238 IE Bulletin B2-03. "Stress Corrosion Crstklnj in ThicV-
Wall.Larje-DiimBtar.StalnilBSs Stul. Rfft irculation Syt
Pioitifi at GHR Plants " Svc lia< entl
5EVOLJNQ.R C Director'* Office. Office of Inspection and
enforcement 02/10-/U Contol igated Edison Co of Neu Yorlc
llgpp ISaiO 123 S41C Ficfte 50-000,02/10/14,8309190238
3 Reportahle o<ccur i rince, LERi * related correspondence
0210130155 Informs of aiiaq,uncy of iraffc IE in'o notice. "Potential
Failure of BWR B-ictup Manual 8c pan Capabi 11 ty" initlatpd
t<l NHR, IE (< OE iubtenunt So 900939 LER BO-03B/01T-0
CHIBAHAL.rt DlT'ctor's Office Ba/lE/18 Dlrectnr't Office lp
1S692. 179 24X Fiche 50-an, BO/I2/IB, 8310IS0155
B210060030 LEB 02-034 /03L-0 on 820926. both HPCI ^rea
Biji taken out "' svc for corrective maint Majnt req
to pai'itiirs from steam leal condensing inside tietoc
causing false smoke indication Detectors replaced t
UMITHEV. C C Boston Edison Co 02/O9/24 RfrOJ
DlrectoT lp 15615 0/3 21X Fiche 50-293, 82/09/
6310070315 Forwards LEII B2-U36/03L-0
MrtTKIS, C J Boston Cdison Co 83/Of/P 1 }
Drfice of Direitor lp 15637 112 2'1X
B3 I 007024 5
HftVNES, R f R ( , l(m
--B210570247 LER e2-036/03L O on 820903, dur ing 75/. pOLjer , main Un Li
flou indicator I) merit to ', three other sluam flouj
increased Cause suspected to be valve stem separation Finn
poppet Valve repair plan lui 1 1 oe imp lumen toil aftpi oidaqf
WKrrflEV.C Boston Edison Co 03/09/39 Hegiori I, l]lfut \.f
Oii-Hctoi lp 156T/ 113 24X Fiche 50-291, Ba/O-J/Jv. U,nOOf)'.'C
6210070340 Foruiards LER 02-Q35/O3L-0
MA.TH1S.C J Boston Edison Co 62/0'''/29 HftYNCfS. H C Hegiun 1
Office of Director lp 15634 Odd 24X Tithe SO-? ft l!.VO?/ t V.
B21 007^3*0
--9ai007034& LEB B2-035/03L-O nn 8201330, dc, ns HPC1 Obrvvif lanti tul
jland seal condenser gasket Failed Caused by ovcrarcsluit o(
jastet during startup Casket mat! changed to rutlitr boiideJ
asbestos Unit tested '> returned to svc
IjHITrJEV.O G Ooston Edison Co B2/09/2 1 ? fleoi,
Director ]p 1 5d34 Oi7 24X Fiche 5O-293: Q2/O9,
82(0130472 Forwards updated LER B2-003/ 1 ?7X-1
MftTHIS.C J Boston Edison Co B3/Q9/3O HAYNES> C
Office of Director lp 15i02 132 ?4K Fithe SO -."H.
8210130473
fltijli,, ],
021013047^ Wpdateil LER B2-003/99X-1 On 830901, ut,l nroflrn ialic
revised Tech Specs being reviewed For submilttil Lo UJii
Updated reo rgani tat ion chart encl
WrilTMEV.O O Ooston Edison Co 83/09/30 JtBninn I, IIMu
Director 3pp 15682 133 24X f-lche 50-2?3. a3/QV/M HJJOl
rtuardt updated LEft 82 -0-I4/O3X-1
HATHISiC -J Doston Edison Co 02/10/01 HAYNtS. [1 C fltgign I
Dff!c of Director If 15737 53f 24X Tlcfie 30 -d*/ !. JU/1W0]
B2 10-190335
BP10170S37 Updated LER ea-O31/03K-| or. Q308Pft. b H 111 Hl'( 1 JIM fyt
rfetector i|s made inoperable Caused by need Fo-r torrednt
.na-tnt due to False smoke indication resulting from
condBnsat ion Inside detectors Detectors removed li r<rp|>iH
qtliTHEY.S G Oostan EHison Co 82/10/01 Kc-jlon |. lltn,( *
Oirectar lp 19/37 240 2<J* Ficho 50-213. HL 1 / IO/01 , (l.'l')l , -
B21023012? Forwards LEIt B2-039/Q3L-0
MATHia.C J Boston Edison Co 82/10/30 HAYNES. (I C
Office of Director lp 15937 117 3-1X Ficho ISO -BWl
B2102SOI27
--&310290131 LER B3-039/03L-0 on S20920. tuning tcotn of thru TIM
utr cleanup isolation valves 1201-2. -9 !. -GO nol
fartftetad uithin allaued time Caused by operatlorval
coH'straint* requiring testing at reduced potuur
WHlTlfEy,0 Qoston Edison Co 82/10/20 Ration J llFfin t
DiTflctor 2pp 15837 118 34X Fiche 50 -293, 0."/10/SQ, nilOiiil 1
Foru*fda araft IE info notice, "Potential Failure of WR
Backup Manual Scran Capabi) itij'" per 3Q120S msetinf
agrmf rit
LAIWA3, C Atii'tant Director for Sifttv Asaesinsnt 90/12/15
JORDAM, L Division if Rttsldmt & Jtigional H*actor InipEttiori
4pp l$t>12 ISO 34)! Fichu 50 -293. BO/12/18. 8240130135
8Z10040IOO Forwardt LER 82-037/03L-0
MATHI3, C J Bo* ton Etflvon Co 62/09/22 HAYNEB, fi C Rogien 1,
Office o* Director lp 15530 354 2 Fiche 3O-2?3,
8210040100
9210280146 Forwardi LER H2-040/03L-0
.C J Goltnn EJiaon Co 82/1O/20 HAVNE3, H C Pilltn t
of Director lp. 15B37 225 24X Fiche 50-29,1,1)3/10'."
--8210290180 LER B3-040/03L-0 on 6209SO, f ounil realtor pmui
initiation function of turbine atop valva conplited 1 Jj
[ate Cauied by dtciglon to defer test due to HSIV D lint
liatitlon TracUng s^s implemented to prevent rscuTHni-
UfltTNEY.O Boston Edison Co 82/10/20 Ftcglon 1,
Oirtct-jT lp I5B37 S26 24X Fiche 30-293, 93/10/20.
8^10040109 LER B3-Q37/03L-0 pn 8Z0623, three monlhln functinrjl
tui-vifl lancet performed in illght ticats at allowable S3K
tolerjrita Cauted bij piptonnil avtright Bnlr lavfl
compllanca review implenenttd Propotel ti*t -aide Planned.
UHITNEV.O 0, Boiton Edin r Co B2/09/82 Beaton 1. Office of
Director Iff 15980:393 24X Ficha. 30-393, SZ/Oq/BS, 6210040100
8210060023 Foruardt LER ea-034/031
MATHIB.C J. Boton Ediion Co, 83/09^34 K4VNE0, fi C Kit fun I,
Dffici of Director lp IS&iS 072 24X Plcht 30-8
92100 t0023
DOCKET 30-295 I ION MUCLEflfi POWER STATION- UNIT I
F Security, medicalr emergency 6 fire protection plant
8209290125 Rclaatet public veriion of revised generating ill 1 !)**
entirgency plan corporate convnanrf ctr emergBnci) pljn
Imp t minting procedure
FELVQU.J H DiviVion at Rules *nd Rtcordi 93/09/16 tit
Hng men.t Branch. IP 15564 122 24X FUh 50-000,
6209290139
DOCKETED ITEMS
103
B2C92901B9 Forwards public version of Revision 4 to generating station
emergency plan corporate command ctr Emergency Plan
Implementing Procedure EDF-3, "Environ/Emergency
Coordinator " Receipt form encl
PAJDHSKI.J E Commonwealth Edison Co 83/07/01 DENTON, H R NRC
- No Detailed Affiliation Owen lp 15344 123 24X
F(el* 50-000.82/09/16,8209390125
B2W21Q325 Public version of Revision 4 to generating station
esierntncy plan corporate command ctr Emergency Plan
Imp levanting Procedure EDF-3, "Environ/Emergency
Coordinator "
PAJOUEKI.J E Commonwealth Edison Co 82/03/31 llpp
15564 124 24X Fiche 50-000,02/09/16,8309390125
&21QOB002"? Releases public version of revision to emergency plan
imp lamen ting procedure
FELTOfl.J M Division of Rules and Records 82/09/22 Document
Management Branch lp 156i9 307 24X Fiche 50-295,82/09/23,
6210000029
&3100S003Q Forwards public version of Revision 3 to Emergency Plan
Implementing Procedure EPIP 350-3, "Radiological Supplies
for Medical Emergencies " Receipt form encl
PLIHL, G Commonwealth Edison Co 02/09/O7 DENTON, H R NRC - No
Detailed Affiliation Given lp 13669 305 24*
FLche 50-275, 03/09/22.0310080029
--B21QOBOQ31 Public version of Revision 3 to Emergency Plan Implementing
Procedure EPIP 550-3, "Radio 1 og ical Supplies for Medical
Emergencies " Procedure change request form encl
Commonuiealth Edison CD 82/09/03 Bpf 15669 309 34X
Fiche 50-295- 83/09/23. 8210080029
B21O050207 Forwards revised eiomption requests from provisions of
JQCFH50. App R, Section III 2 re post-fire shutdown
capabil i ty, per 820917 tolcon
LEWriNE.F Commonuoalth Edison CD 82/10/01 DENTON, H R Office
of Huclear Reactor Regulation, Director 30pp 15&I1'086 24X
Fiche 50-295, 82/10/01,0210050207
B21OI3Q37& Advises that installation of offsite dose calculation sys
program fully operational tracking model tt operational
A- mod el uill be delayed until 021231 to complete prime
computer installation
SHARTZ,E D Commonwealth Edison Co 83/10/06 DENTON. K H Office
of Nuclear Reactor Regulation. Director 2pp 15682 098, 24X
Fie he 50-000,82/10/06,0210130376
Q2I0290047 Releases public version of revisions to Quad CitiBs, Zion b
Dresden emergency plan anneies tt revised oenerating
station emergency plan telephone directory
FEL.TON, J H Division of Rules antf Records B3/10/00 Document
.Management Branch lp 1S077 313 24X Fiche 50-000,82/10/00,
G21O290047
S21O3900AO Forwards public version of Revision 3 to Quad Cities t Zlon
emergency plan anneies, Revisi on S to Dresden emergency plan
annex. Revis ion to Byron emergency plan annex & revised
generating station emergency plan telephone directory
MOORE, n D Commonwealth Edison Co 83/07/30 DENTDN, H R NRC -
No Detailed Affiliation Given 5pp 15977 314 24X
Fiche 50-000,82/10/08,8210290047
B210290077 Public version of Revision 3 to Quad Cities b Zion
emergency plan anneies. Revision Z bo Dresden emergency plan
.annex t Revision to Byron emergency plan annoi
* Commonwealth Edison Co 82/06/30 325pp 1S877 319. 24X
Fiche 50-000,03/10/08,8210390047
B210290OBa Public version of revised generating station emergency plan
telephone directory
OALLE.D P Commonwealth Edison Co 82/08/12 43pp 15078 218
34X Fiche 50-000, 02/IO/OBi B210B90047
E21O2BOH7 Releases public version of revised emergency plan
imp I e merit ing procedure,
FELTDN.J H Division of Rules and Record! 82/10/12 Document
Management Branch lp 15862 241 2-tX Fiche 90-295,85/10/12,
B2102301 17
B3I02801EO Forwards public version of Revision 2 to Emergency Plan
Implementing Procedure EPIP 150-1, "Stores Director "
Receipt form tncl.
PL I ML, O Cammoniuealth Edison Co B2/09/17, DENTON. H, NRC - No
Detailed Affiliation Oiven lp 15842 342 24 X
Ficbe 50-295,02/10/12,8210280117
6210260419 Releases public version of revised emergancy plan
implementing procedure
FELTQN.J M Division of Rules and Record* B2/1O/12 Document
Management Branch lp 15860 001 24X Fiche 50-295.83/10/12,
B21020Q419
0H10290424 Formal-tit public version of Revision 3 fco Emergency Plaiv
Implementing Procedure 11O-1, "Station Director " Procedure
change request & receipt forms enel
PLIML.O Commonwealth Edison Co 83/09/17 DENTQN, H R NRC - No
Detailed Affiliation Oivcn 2pp 1S860 002 34 X
Fiche 30-293,83/10/12,3210280419
8810230427 Public version of Revision 5 to Emergency Plan Implementing
Procedure 110-lr "Station Director " Reviseii index encl
* Commonwealth Edison Co B2/09/16 3p p 15S60 004. 24 X
Fiche 5O-29S.82/1Q/12, 9310280419
B21O2SQ442 Helaaies; public version of revised emergency plan
imp lamenting procedure
FELTON, J M Division of Rules and Record* 82/10/12 Document
Management Bran-ch fp 15639 001 24X Fiche 90-295,92/10/12,
0310280442
0210200445 Forwards public version of Revision 4 bo Emergency Plan
Implementing Procedure EPIP 350-3, "Environ emergency
Kit & Emergency Operation* Facility Radiological Equipment "
Receipt form enel
PLTMI.,0 Commonuealth Edison Co 82/07/10 DENTON, H R NRC - No
Detailed Affiliation Given lp 15859 003 24 X
Fiche 50-293. B2/10/12, B210200442
8210200447 Public version of Revision fl to Emergency Plan
Implementing Procedure EPIP 550-2, "Environ Emergency Kit &
Emergency Opera tinni Facility Radiological Equipment "
Procedure ehanga request -farm encl
* Commonuiealth Edison Co 83/09/03 3p p 1585? 003 24 X
Fiche 50-275.B2/10/12, BS10300442
B2103SO350 Pros-id*! info re organiiatlon & performance of deptv
raiponsible for radiation protection activl ties, per 020702
commitment Training coordinator assigned in Apr 1702 to
improve health physics training programs
TRAHH.T R Commonwealth Edison Co Q2/1O/14 DENTON, H R Office
of Nuclear Rinctor Regulation, Director 9pp 15776 287. 34X
Ft ck ' 50-000, S2/ 10/14, 021 02203S8
S2102BO405 Notification of 821020-29 meeting s u/utll (. DNL in 8athida,
HD to discuss ti resolve questions on proposed etemptlan to
App R
HI001NTON, D Operating Reactors Branch 1 82/10/22, VAROA, 8, A.
Operating Reactori Branch 1. 2pp 15859,327 24>X
Fich 50-S9S, BB/10/22,8ai02B0403
H Oeneral correflpondenc*
B2 102 10235 Comment* on facility operation NltC ihoultf deny util
permission to USB high bifrnup nuclear fuel Evidence
supporting continued operation of facility should be
provided to p ub 1 ic
QUIOO, C Pollution i. Envirnnmantal Problems. Inc 02/1O/11.
Director's OffitB, Office of Inspection and Enforcement Spp
1=5746 2B9, 24X Ficho 50-K9S, 0B/IO/1 1 , SSlOaiOS35
J Iniuranc* & Indemnity information
B21OOAO2S3 Foruardi Endorsements 60 fc 51 to NELIA Policy NF-301 !< MAELU
Policy MF-M, reipBCtlvelij
OSTEH.J Common uiaa 1th Edison Co BS/10/01 SALTZrWN.J, Asiistant
Director for State b Licence* Relations. Spp 15621,073. S4X
Fleh*' 50-295, B3S 1O/OI, 331 00402B3
Q Advisory Committee on Reactor 0afeguard*. reports tt correspondence
B21O27O400. Comment* on probabilistic risk assessment per B11221
matl.Oineral met hod ti principles emplayid in analysis of
possible rthquafce shaking t> site appear to applij modern
stat* of *rt tschninud,
TRIFONACiM D Southern California, Univ, of, TRIFUNAC, M. D. ACRB ~
Advisory Commit t* on Reactor Safeguards 82/02/23 ORIESMEVER. J M,
ACRS - Advisory, Committee on Reactor Safeguards Spp, 15032,353,
34X Fiche, 90-295, 82/02/23, 0210270403
P Qper-ating license stag* documents & correspondence
Public version of Revision 2 to Emergency Plan Implementing
Procedure EPIP 150-1. "Stores Director." Procedure change
request form end
Commonwealth Edison Co 82/09/16 Spp 1986S 243 24X
Fiche. 90-295, 02/10/12, 02102801 17
0007150303 Notifies that revlu will be conducted of Offshore Pouier- 8ye
short-term risk studies uiing various resources) in response
to eOOoOS re<tuBit Evaluation mill b* submitted by B009S2
MATTSON, R. J. Diviilon of Bafetv Technclogy BO/O7/02
EISENHUTiD 0. Division of Licensing 2pp OS9SH'301, 24X
FUh 30-247, 80/07/02,0007130303
104
DOCKETED ITEMS
BOQ0I3OT4'' Summary of 8006" nutlng ui/util* In Bethtida, tID ri
containmint itructural re*pcni to eon nelt accident
tiquancit
HEVEHi J F Pouir Bdt Branch 00/07/31 Power Bqitem* Branch
3pp (13246 S43 Z*-* Fichi 30-247,80/07/31. BOQBI30744
6210120105 Requeiti delay of implementation due dat*> i- NVflEO IV
Item* IT B 2, "Plant Shielding, " II B 3, "Poit-rtct Hint
Sairtplinj" & II F 1 1. "Noble 0*i Effluunt Monitor "
SUARTZ.E Commonwealth Ediion Co 02/10/01 ElbENIIUTMlS
Divinon at Ulceniino 5pp 15651 237 24X Fi<h 50-000. Slt\:
821012010S
6009100100 FBruardl reconuiindationi on staff tail action pln to b
unt to licsnitii for review t rejponn,
BARRETT, L H Opirating Ractor* Aiiennint Branth 00/OB/OB
VARQAiS A Qp*rting Reitton Branch 1 IPre 900-428) Bff
03516 Oio a -IX Flcha 30-247, BO/QB/OB, 6009100100
BC09250234 Submit! deicrlptlon of uorl being don* on anal^ilt of
reliaiet free, f ictliUei. Simple C-D nul ticompaTtment thirnal
hydraulic cod i bring written, to analijn variety of FVCB
de*isni Helaeid data and
FgNSTERMACHER Reactor Sijittn. Branch BO/09/10 SPEIS, T P
Reactor Syitimi Branch 4pp 03S09 257 24X Fich* 50-2*7,00/07/10,
B009250334
SOlOS2 l Oa34 Ropon,d to BOO 1 ?!? ren,uet ri control room riviiiv NRC 600507
Itr drtail-ed five addl itini to nea-r-ti-rn OL req.uirenentt
Item III D 3 4 requirei analy*li o-f control room
hjibltftbilitj Mj 0L0101
HOtJaiOMiR W AceidatH EvaluatEan Branch BO/O?/35 VARffAi B A
Cptratino Riattor* Branth I lp 03560 001 24X
Ficfti 30-247. BO/09 /2S. 8010220234
S010B1003& Diicumi 5EP Branch rsvieu af J environ qualification
o-f <if*tu-rilatH ilectrical tquipntnt far 11 SEP pla-nti
MCKENNA.e M Svltoffla*** Evaluation Prporsm branch 60/07/30
L(MNA3-OC DivEiion of LUiniing app 036*7 289 84 X
F if hi, 30-003, aO/09/30.eO102t003A
8011110034 Rsqutiti Iiistrunentaticn & Control Si/i Branch gvalution of
util rriponmfi to qu'itianc rt inco-n Cnitrum-tntatidn tubo
at ficilltiii rnfo will aid branch evaluation mitigation
fditure* r back fitting of over* nittgatton Fiaturd
SPEIS.T P Rtactor 8<jitmi Branch 00/10/09 BATTERFIELD. R
Inttrumintatlon & Control Syttimi Branch lp 02227 001 SAX
FJch 30-247.80/10/09,8011110004
SQiOSSOOIB Foruardi NRC nusition* t util aniutrs re bactfltting of
iBVira accident mitigation fiaturti Evaluation ntedrd in tuo
nit i
SfEIS.T P Rictor Sgittmi Branch EO/10/17 BCHAUR,F P
Structural Enolnnrtng Branch lp 45747 104 24X
Flchff 30-247, 90/10/17,9010200098
8310260526 Forwarili Rviilon 3 of Chapter 9 of "Qfftjti Dott
CalcuJ-a tlon ManuiJ "
ODLDEt(,J C Commonwealth Edion Co B2/1O/06 CASE 1 , E 9
Nucliar Ftvactor RtguUtion, Director 2pp 15E)05- 137
Ficfit 30-000, Ha/10/06, B210260526
3210260943 Revliion 3 af Chaptr 9 of "Off site Don Cllcitlatfi-
Manual "
Commommalth Edison Co 92/09/30 03pp 15D05 1*19 Hi
Fieht 50-000-63/10/06,8210260326
BSI 022039 9 Supp li B20414 raiponii to Franklin Rttvartli Ctr 6IIC.1
t*chni<al tva luation rapt ri control af haavg lojdi
(HUREO-OfclBf. ptr B20B24 (< 23 tilconi
LENTIHEpFO Commonutilth Ediion Co B3/10/1S D-FNIDr; H B .
of Nucliar Rtactor Regulation, Diroctor 3pp IS??/ 12? :IE
Flch* 50-298, aa/IO/13. 0210220399
B310190443 Forwarii addl info re NUREO-0737, I ttm IJ D 3, ^H-
Accidant Sampling Sgs, " in reiponie to fJiC 020722 llr
Util eurr*ntl(j punulng paillbilltv of developlno prcc^uTi
to eftimate cart iJamage via Hritlnghouic ounon group
3UARTZ.E D Commonujeal th Ed I son Co 02/10/13 FIGTKI^I C*
Division of Llctntinu 13pp 13741 1B7 24X F-lch* 90-9^3.^
B2EOI90443
8210=70344 Notification of B2I115-J6 meeting* u/utll In Olin tLI^.
to diicuf.* baiei for current inservice tettlng propoied
eiempt ion, inc ludlng alternative) to requirxf Inipi
MIQOINTON, D Operating Reactori Branch 1 BS/tQ/'JJ t' AS 31, 8"
Operatino Reactor* Branch 1 2pp 1 9S3( 354 24X
FIche SO-295, 92/10/22,8210270344
Inipactlon rporti, IE Bulletins k e orreip ondsntt
E210O50105 Foruiird* IE Inup Rapt 30-295/82-09 on
i notice af violation
HEPPLER.J ft. 9 ion 3, Office of Director Q3/07/W
Coimnanuialth Ediion Co 2pp 13403 022 S4X I lent
62/07/09, 0210030105
0210070007 flupondi to FOIA requeit for tight categoriei of ricordi re
itiam ganrratori b ftMin turtitm App A daccments provided
in R Udell FOIA Requitt 81-313 Faruardi document* lilted In
App B
FULTON. J H Divltlon of Ruin >nd Records 82/00/10 LONO, D J
Minthrop. Stlmion, Putnam ti Rottrti 9pp 1S645-OA3 74X
richi 50-OOO, B2/08/10,92I0070007
B2031104Q3 Forwarifi reipon*i lo JB Dunela. chairman of Pollution Control
Board, State of IL. qutitioni in 920127 Itr
JOHNS TOW, M V Ai-ilitant JJlrtctor for Katirfal* & flu*l if leati on*
Englnitring 02/03/22 LAINAS, Aniitant Director for Safttv
Aiceitment Spp 1 SMS, ISA 24 X Fiche 50-000 , B 3/Ofl/lOi
8210070007
82091603113 Buppli B20B31 Itr rt B20TOB meetltig t Region 3 ore
Recent upr*tion of Unit 2 u/tuo Inoperabli auiiliarv
feedu-alt-r punpi Added to aginda
REFPLE*. J O. Region 3, Off let of Director. 03/09/03 REED, C
Common UF* 1th EdUan Co lp 14?04:OB7 S4X Flche 50 - a W, 82/09/03,
82091 60903
921004021 B R<iuitt reaf t iT-natl on of technical baili for oper-atloti
at 100K poiuir Blgnlf leant financial penaltif-i Incurred due
to ojitritlcn In ovirlij coniirvatlve Banner.
STIEfE.H, L Comnonwealth Ediion Co, 63/09/27 DEVOUNfl, R C,
Dirtctor'4 Dfflcei Office of Inipectian and En'orceoant 3pp
(5S83 119. S4f Flcne SO-S95, 62/09/27,8210040310
BS100S0270 Faruardi vinglt CIii III anend rei for prtpoiid diange to
LUenie DPR-39
LEKTIHE.F. O, Connionuaa Ith Ediion Co B2/09V27. DEKIOh", tf R Office
Of Hucler fit actor Regulation. Director lp 15409-164 24 X
Fichu 30-295,32/09/27,6210050270,
8210080111 Forward! conpUtion ititui * revitid ichedule for
inppoveaiinit aade to central room dltplay tine* 1900 r*pti
ftf 80088? conflrMtoTif ordtf
LENTIME.F. 0. Cc-BMcnua 1 1 h EdUan Co 62/10/01 DENTON, H R Office
of Nuclear Reactor Regulation, DIrteter. 4pp 1S640 A93 SAX
Fichu: SO-299, 63/10/04, B?l ftnoni - *
-8310050107 Notice of violation from imp on B203HO " J JI -010?
KEPPLER, J Region 3, Office of Director G3/Q7/Q? 3
13603,024 24X Fiehe 50-295,82/07/09,9210090103
-BSlOOBOlia IE Intp Rept 50-299/82-09 on 320330-314 007 00 fc !l
Noncompllance noted individual received uhole bo-ig rllalii'
doie In eiceff of three rm ti failure to adequately iufH| I
evaluate radiation leveli beneath reactor velvel
MILLER, D E , OREQER.L R DivUion of Engineering t FnK-lt*:
Pr a or* ms, a2/0i/ll 14pp 15605 057 84 X Flehl 50- * J *H' '
9210090105
0210070007 Respondi to FOIA requett for eight categorlei af rui
iteam B*ntrton ( iteam turbinei App A document! proviJil
in R UdlL FOIA Requeit Bl-313 Foruardf documenti 111 til 1*
ripp B
FELTON^J M Dlviilon of Rulei and Recordi, B3/00/10 ICfrt.'
Minthrop, Btimion. Putnam 1< Robert* 9pp 1 36 4 9 Oi3 E4I
Flch* 30-000, 92/08/10,0210070007.
62100701 a? Foruardf tabulated data on (team generator Inie I w
facd itiei. Data ihould be provided to licennei
[PPOLITO, T. Operating Reactori Attenment Branch, BiWZ'.
VARQAiS, Operating Reactori Branch 1 9pp. 106*9 III !' :
F iehe. 90-00 0, 92/00/10, B210070007,
6210070172 Feruardf info re iteam generator integrLlii i IMJi
optratingj FMRiiper 750320 It 21 requeiti Detail* el Ln.ifi<
including defect indicatlonu tube plugging crltri* I UU*
plugged will not be provided except for Point Death I
OOLLER,K R. Diviiion of Reactor Licenilng (NflR-fl enli I
78/03/2-4 HACCARV.R R. DivUion of Technical Rviw lM**-J
only) 9pp 15443' 196. S4X Fiche 30-000, 02/06/10-
S2I0190SoB Foru*rdi IE Enforcenunt Conference t Imp fltpK
& 50-304/92-17 on G2D717-090? h notice of violation
BPESBARD^R L. Divliion of Project t< Rteldunt Proor*
REEDiC Convn onoea 1 th EdUan Co Bpp. 15736 119
Flch* 30-Z1S, 82/09/30, 821019034B.
341
R.
9210190979 Notice af violation from in*p on 520717-0031
* Division of Project 4 Reiident Programi. BS/0 1 J/
15736:113 34X Fieht: 30-295, 82/09/30,0210190948
DOCKETED ITEMS
105
-B21O19059? IE Enforcement Conference t. Insp Reptj 90-295/82-19 (.
50-304/6-3-17 on B2O717-0909 Nancomn 1 lance noted failure to
follow 600229 conf irmatorij order requiring aipedi tlou*
thutdQLjn whenever auiiliarg feedwater sys inoperable
MATEitS.J R , SCHNE1DER.8 , REYES. L Region 3. Oftlft of
Director 03/09/22 9pp 15736 111 24X Fiche- 30-295.03/09/30.
D21019056B
B31006O359 Ack receipt of B 20<?10 Itr informing NHC of steps taken to
correct violation* noted in IE Insp Repts 50-337 /B l~39t
50-249/81-32, SO-254/B1-23, 50-265/91-23, 50-395/81-31 t,
SO-304/81-39
SP-ESSATj, R 4. Division of Project b Resident Programs 82/10/01
HEED.C Commonwealth Edison Co (p 15618 354 E4X
Fiche 50-000.03/10/01,8210060359
3 Roporteil* occurrences, LERs & related correspondence
9,210120163 Discusses finding* re numerous -failure of containment
isolation vilvn All failure* resulted from inoperable ASCO
Serial 6320 solenoid va 1 vm. uoua I lq duo ta oil in air
supply Valves undergoing qual ification
LANNINOrH D Director's Office 80/00/23 Director's Office
2pp I5&92 2IA 24X Fiche 50-275. EO/OB/23, 9S101201B2
B2100 1 7O429 Dlscussei B10115 solenoid valve failure Failure of valve to
sMft attributed to impuritie* in oil settling on valve
surface Valve* replaced No further action recommended
ASHE, F Director 's Off ica 01/1 1/10 MICHELSON, C Director'!
Office 4pp 13644 317 24X Fiche 30-278, Bl/1 1/ 1O, 8210070429
3310060367 Responds to NRC 020712 1 tr re violations noted in IE Insp
Rept I 30-237/B1-39, 50-249/81-32,50-254/91-23, 50-26 5/0 1-23,
50-295/01-31 6 50-J04/0 1 -S9 Corrective actions training- far
mq t priorities re plant availability uii 1 1 be conducted
FJEEB.C Commonwealth Edison Co BS/09/10 KEPPLER, J Region
3. Office of Director ISpp 15618 359 34 X
Ficne 50-000,03/10/01,8210060359
8210070422 R-ecoromend'S IE issue info notice to inform license* of
possible inadequate sucve il lance For proper tuning of
output capacitance for certain inverters Recommendation
bated on B1O30S t* 26 sola output tram-former *horts
HELTGMEB, C Director's Office. B1/12/1O JORDAN, E L Division
of Resident & Regional Reactor Inspection, 4pp 15644 205 24X
Ficfie 50-295.81/12/10,0310070438
Forwards listing of piping sya which fail to meet F8AR
requirements, per NRC 800818 conf irmatory action Itr IE
Bulletin 79-14 operability evaluation updates utU not be
provided for Dreiden ! Quad Cities Final update by Pec 19B3
RAUSCH. T J Commonwealth Edison Co 82/10/01 HEPPLER, J Region
3, Office of Director 6pp 15640 159 24X Fiche 50-000,82/10/01,
BE10OS017B
21O190617 Forwards IE Insp Rept 50-295/83-21 on B2Q90S- 1 No
nan coop I ] an CB noted
LITTLE-M S Division of Engineering & Technical Programs 82/10/03
REED, C Commonwealth Ediion Co 3pp 13739 094 24X
Fiche 50-295, B2/10/05. B210I90617
0210010003 Re spend i to FOIA req,UBtt for 19 categories of documents i-a
nuclear raoctor events t safe*v problems Forwards document*
llcted In Apf A
FELTON,J M Division of Rules and ftecords. 02/06/29 UDGti..n.A
Critical Mass Energy Project ISpp 15727 005 E4X
Fiche 30-000, B2/O6/2S, 031 00100OB
8111270314 Bucuties LER ai-002/O3X~l. d td Bl043-0,re inoperable solenoid
valvas, Cause found to be Impurities in internal mechanisms
Valves replaced ui/Kene valve* & solenoids u/higher itrengtfi
coil Findings to be Inc orpor a ted in instrument air study
ABHE, F Director 's Office, 01 /I I/ JO MICHELSQN, C Director 'a
Office 3p|i 13731 109 24X Fiche 50-000.02/06/38,8310010008
-Gai0190t26 IE Insp Rept 50-295/B2-21 on B20908-1O No noncompl ianco
noted Major areas impacted Cijde 7 control rod drop time
testsr control rod drive & position indication cheeks i.
r tact or thermocouple/resistance temp device cross callbr
ROBINSON, D L . JACK I W, I N Region 3, Office of Director
S3/IO/01 4pp 15739 096 2flX Fiche 50-295, B2/1 O/OS, 8310 190617
SSlOOBOOBH PHO~lll-3S-tOi> on B2O930. uh i 1 e operating at full pouerp
one of tuio main feeduater pump* Palled Reactor control rot
drive *v* failed to invert rods automatically Causeif by
faultg circuit board Circuit board replaced
REVEB, L . STnEETEfi,J , SPES3ARD. R Reolon 3. Office of Director
B?/1O/O1 lp 15640 222 24* Fiche' 30-295. BH/10/OI, B21008008B
IE Info Notice 80-39, Suppl 1, "Leaking & Dislodged 1-123
Implant Seeds " Svc list encl
CDBD.L I Division of Fuel Facilities, Materials Si Safeguards
BB/]Q/Q> Consolidated Edison Co of New York 66pp 19761-2DO
34X Ficrte 50-000. 83/10/06. B20BI 90233
At* recBipt of B20910 Itr informing NRC of steps taken to
con set violations noted in IE Insp Rents 30-279/82-14 i
5-Q-3G4/Q3-13 Interpretation of Tech Spec 1 D unacc fff t-abl*
SPESSrtRD, R L Division of Project 6 Resident Programs 82/10/07
REED, G Commonwealth Edilon Co lp 19739 361 34X
Ftche 90-395, 02/10/07,8310190613
821OI9Q624 Repondi to NRC 620913 Itr re violations noted In IE In&p
Repts SO-2?S/Ba-14 tt 90-304/B2-13 Disputes NHC
classification of 020629 reactor trip Trip inadvertent
Interpretation of Tech Spec 1 D encl
8TIEOE, W L Commonwealth Edison Co 82/09/10 KEPPLER. J
Rag ion 3, -Office of Director 4pp 1S740 001 24 X
FicJi* 50-2?9, 82/10/07, 8210190613
O819023B IE Bulletin 92-03, "Streis Corrosion Cracking in Thick-
Wal 1. Large-Diameter, Stainless Steel, Hec Ircu laiion BIJ-B
Piping at OUR Plants " Svc list encl
DEYOUNO,R C Director's Office. Office of Inspection *nd
En-f Q-pcBinent 82/10/14 Cansalldated Edison Co of Neu Vork
113pp 15810 125 34X Fiche 30-000,83/10/14-8308190230
IO27G34-) Motification of 8211 1S-1A meetings w/uti 1 In 01 en El Iijn, IL
to discuss bases for current inservlce tatting propound
exemption, Inc luding alternatives to required inipi
JICGINrON.D Operating Reactori Branch I. 82/10/22, VAROA. B A
3prafclnig Reactors Branch 1 2pp 13831-364 24 X
~iche SO-293, 02/10/22, B210270344
Periodic ope ratine reports b related correspondence
LO19040S Forwards monthlg operating ripts for Sept 19B2
JRAESSER.K L Commonweal th Edison Co 8S/10/06 Director's
Jffice, Office of Inspection nd Enforcement lp 13704 003 24X
-fen* 30-3?3 P 62/10/06,8210150405.
121OI50411 Monthly operating repts for Sipt 1985
AUSTIN. Commonwealth Edison Co 82/10/06 llpf>.
24X Ficfce 50-299,83/10/06,8210190409.
8310190699 Forwards LER B2-027/O3L-Q
ORAESSER.H L Commonwealth Edison Co 33/10/09 KEPPLErt, J B
Rgfon 3. OP t ice of Director lp 15738 143 24X
Fiche 30-393, 83/IO/Q5, a2i0170c,B9
8210190719 LER 03-027 /03L-0 on S20905, 1C containment spray rflettel
driven pump Pounrf completely void t>P engine jacket water,
Caused *Y leak In jacket uaber heater due ta corrosion
Heater replaced u/ptpe plug Neu heater-e ordered
SHIM, K CommaniiiBalth Edlton Co S3/10/O5 Region 3, Office of
Director 1 p. 13739 144 24 X Fl c he- SO-393, 03/10/03,
0310190493 Forward's LER B2-02e/Q3L-0
QRAEBSEfi, K L Commonuel th Edison Co B2/10/O0 KEPPLER- J
Region 3, Office of Director lp IS740 SAA 24X
Ficha- 30-393. B2/lO/OB,B21OlfO403,
821O170493 LER B2-028/03L-0- an 62O910, dur ing surveillance at 1OOX.
ptnj*r,RHR mlniPlou control valve suitch 1F1C-4IOA failed fc
would not close mlnlflou valve at 100O gpm as designed
Caused by switch nut of tolerance Mod initiated
BIMGOELI.fl L Conmonuealth Ed It on Co aS/10/08 Region 3i
Office of Director lp 1574O 267 2-4X Fiche, SO-39S, HS/IO/OS,
8210190103-
821026-0399 Forwards LER 82-O30/03U-O
ORAEBBER, K L Commonuiea 1 th EdUcn Co 0S/10/I7. KEPPLERi J
Raglan 3, Office of Director. lp 1 9S03 327 S4X
Fiche S0-293i 82/10/19,
B21Q2&041f LER B2-O3D/03L-0-tin B20919, charg Irg flou found 30 gpn. la on
than letdown flow Increased demand on eharfllng flow control
v*lve did* -not Increase floui rate Caused by fatigue Rotating
element replaced) Investigation ongoing
BINOOELI. B. L. Commonwealth Edison Co 92/10/19 Region 3,
Office at Director 3pt 19B03-33B. 24 X Ftchi 80-893. 62/10/19,
S2IOS&0399
821OZ60S33 Fnruard* LER 8S-O29/03L-0
ORAESBER.K L, Commonweal th Edison Co. 83/10/30 KPPLER<J. Q
Region 3, Office of Diractor lp. 15303:039 24X
FUh'30~29S, 92/1O/20,
106
DOCKETED ITEMS
SJ1026025* LER 82-029/03L-0 on B2Q920ilogU relay NC41M-XA atioclated
u/pouier range XlOX reactor trip Far train A malfunctl oned
nonconerva tively Caused bj plunger pin ihlftlng to one lide
& binding agalntt mla<j housing
flGHDE.J E Coflimonijealth Edlion Co BS/ 10/20 Rtglon 3; Office
aF Director lp 19903 030 24 X Fichi 50-S95. B2/10/20,
&21 0260*33
B21013QJ42 Forwards description of final mods & changct to BUR icrji
iijs & fJiort-trrm interim commitments For Unit 3 Modi will
be implemented For Unit Z before startup from Reload -4
outage it subuquent Uniti 1 t 3 outagci
MILLS. L M tennenea Valleg Authority 82/10/06 HE If TOW. H R
Office of Nucltr Reactor Regulation, Director 4pp 13673 OP4
24X Flehe SO-259. a2/lO/06,B210130!42
DOCKET S0-2a BROWNS FERRY NUCLEAR POWER STATION, UNIT 3
F Security, medical, emergency & fin protection plant
3310350096 Forward* revision to B21QQ6 implementing procedures
HILLBrL rt Tirvnesee Valley Authority B3/10/15 DENTOW.H N
Office of Nuclear Reactor Regulation, Director In 15793 = a
Fiche 30-239, 63/10/15,3210250096
B209170101 Forward i minor rBVisioni to proposed physical security plan
Revisions withheld (rot 10CFH73 21)
KlLi.8, L M Tennessee Valley Autnorlfcij 68/03/31 DENTON, H R
Office af Nuclear Reactor Regulation, Director Spp 14910 091
24X Fiche 30-299.82/08/31.9209170101
Forward-! security plan table of contents Tb1i of conte
ulthlield Iref IOCFR73 211
HAMMER, D S Tenneiiaa Valley Authority 02710/19 DEN TON, H R
Office of Nuclear Reactor Regulation. Director lp 1 S78B 3 A3
Fich 30-259,
9210250244 Foruards revliloni to phijfita] security plan Revitioni
uiitnheld (raf 10CFR73 31 )
KAMKEft, D S Trm<m Va 11 14 Autnorft^ 82/10/19 DEN TOM. H R
Office of Nuclear .Reactor Rtgulation, Director lp 15769 34S
Fithe 30-250, B2/10/19. B210250244
Adjud icatorij com spondenc*
02 1 0350101 Ravited implementing procedures
* Tennenee Valley Authoriti; 82/10/15
Flche- 50-23-?, 32/1O/I5, 9310350096
lipp
13793 059 211
[nipection reportii IE Bulletins It correspondence
BB100B0015 Addl rtiaonsr to FOIA request for 19 categories of infs
nucliar r*Jctoi- events (< iafetij problems Forwards document*
llittif in App A Documents In App B completslij uiithheld Irif
FOIA Eiernp 1 1 on S 1
FECTOM, J H Division of Rules and Record! 83/07/13 UDZLi.il t
Critical Ma Eneroy Project 9pp 15465 027 24X
Flcli* 30-000, B3/O7/12.B2100Q0015
bap
Systematic asiessniant of licensee parformance notif
evaluation for Apr 1979-Mar I9BO
HI NRC - Ho Detailed Affiliation Given BO/03/31
I36i7 31S 24X Fiche 30 000, 82/07/12. H21 OOHO015
921012029L Retponae to ASLAE B2092O order to provtdi any sup
info r nueitiont jiossi to utll Autliorl Jt(on ii for 3-ur
itorage of loui level radud-ttii oi/o Unit on use af modules
for interim ute on backup baiii
RAWEOfJ, H J HoPifig Branch 4 82/10/09 Bpp 1 5652 071
FUhe 50-259, 92/10/-09,
S210130105 Notifin* that corrective acttoni ro IE Imp rtepts
30-2S9/H1-13. 50-26.0/B1-13 b 30-296/81-13 dDlayod Procedure
DPM HBOE3 re e>am of CSSO I terns to be revised by D30915
DQMER.JA Tenneiian Va 1 leg Author i tu 92/07/1,1
Region 2, Office of Director lp 15701 159 24X
Fleft* SO-25?, 82/07/13, 9210150105
Q210IS0299 Affidavit of P L.oysn re application for storage o-f Inu
level raduaite Ha restriction requested or ton t (inflated
Uniting us of modulai only to Inttrlm use on bjctup bails
LQVBENiP Advanced Fuel 1 Spent Fuil Licensing Branch 62/10/OB
H3pp 156S2 079 24X Fico* 90-239, 62/10/03,9210120291
8210120309 Affidavit af JR taGrach Timily request ror- renawal af
facility liceme fllld for B*atlUrNV tou level radu&fte
dliposal fa ci Utii NV Statu Board of Hulth voted nc-t to
reneu Facility llcante
HCOHATHi J fi Assistant Direttor for Stjt* Agreemintt Progra-un
B2/1O/09 ?pp 1B652 102. 3<5X Fieh* W-3S9, B2/IO'/Oa, 8210 120371
9210230151 Pcovidei tupplemental reaponie to NHC 1 tr re vlolatiort
noted In IE Inp P*pts SO-S39/B2-1O, 30-260/82-10 it
30-296/02-10 Dlv of procedures Manual NB2A3 mill not be
revHed until 82100-1 due to icope of effort Involved
MILLBfL M TtnnessB Val ley Author i ty B2/OB/1B Q'REILLV.JP
Rejjlon S, Q*fic of Director ip 15770 106 24X
Ficher50-2594 B2XOS/1 B. B2I0220151
fl3l 0010035 Cofiflrmi 62O90B iite meeting to discuss recent
re raduMtte ihlpmnta Agenda end
O'REILLY, J P. Region 2, Office of Director 82/09/03
TtnnB*e Valley Authority 2pp 19965 166 24X
Fiche 30-239. &2/09/O3, 0210010033
--92 10 1 203 16 AffUavlt of SM Bale man Sout^ett Intertti Lou Level
Radius its Mgt Compjct agreed to elate Barnu*! 1, EC facility
on 921231 8. optn nw tits on 91 1231, Certi P Icatr of Bvc encl,
8ALOJ10M,B N Anlitint Director for State Agreement! Progran*
B2/10/09 4pa 15432 104. a Flehe. 30-239. S2/JO/03, 8210 120271
B2102SOOi3 Telecopy n*nage of motion for rtBLAD to grant 30-Jay
itenslon to Tiipond to ASLB B20920 order. Tlitw nictturu to
explore lettl enenb poislbt lltln of all nttin In
controversy
P ?5 2, Pgl ' " fl - B *W Oocleting (, eervic. i Branch lc
IS7B7-061 S4X Fiche 30-239, B2/ lft/20, B210SB0063,
82:10240459 Motion For eittncton of tine until 621121 to respond to
920930 order Time niceisary to explore pan it 11 Itiei of
ledtlenant Certificate of Svc encl
PVLE.R B Pg|,, R. B 02/10/20. Atonic Safety and Llcimlng
Appeal Panel 2pp JSB06 036 S4X Flche 50-83?, B2/10/SO,
B2102&0429
B210010430 ForLKi-di IE Insp Repti 90-359/82-29, 90-260/62-S3 t,
50-396/B2--BS on 820aiO~ll No noncomp 1 iance noted
vEftflELLl.D M Dlvisian of Project t> Resident Progrsmj
PARRI9,H TenneisBB Valley Authority 2pp 15570 211 3-**
Flthe SO-259, 62/07/03, B210010430
BJ10010432 IE Imp Rapts 50-297/82-25,30-260/82-23 b SO-3W&Z-1
920310-11 No non compliance noted Major areac Impacted
reactor leconifary containment integrity problem d M8IV
testing
HROOKS.e H , JAPE.F, Division of Enoineerinfl (. Technical Pro]'
B2/OS/27 4pp 1S370 213 24X Flche 50-239, Ba/09/03,0310011
8210150399 Foruardt IE Imp flepts 50-2S9/B2-2H, 30-240/B2-2B fc
30-296/B2-28 on 830830-0903 No noncompl lane e noted
VeflHELU.D M Dlvliion of Project fc Resident Prnorams B2/09/H
PARfllS.H O Tvnnftliea Valley Authoritg 2pp 13704 029 B4
Flchti 90-237, S2/09/20, 8210130399
P Oparatlng llcinte itage documantt i carreinondince
P H|l 11 '! r ?* p 5 n i' to NftC "1""* fm '"1 info on
"Control gf Heavy Loarfi of Hurl ear Pouir
MILLS.L,H, Ttnneneo Valley Authority- B2/09/28 VASBrtUO, D D
Operating Reactors Branch 3 86pp. 13433 243 sat
Flchf 50-299, B2/09/2a f e21007023S
,, in Mlp " BM t0 ^ BBOB( > 3 "1*
"Atqu of Space Coalliri for
DENTON.H, R
HPCI RCIC
1 " 1 ""
62 1 01 5040A IE Intp Repts 50-259/B2-2B, 5Q-36Q/fl2-2B k 30-296/03-15
B20'830-0903 No noncompllance notad Major area* Intpacleri
Ititervlce imp program ti Inserviet testing program review
OIRAHDi E H , BLAKE. J Division of Engineering 1 Technical
Proirann. S2/09/1A 4pf 13704'031 B4X Fiche 30-239,83/0^
&E101S0399,
8210010097 Approve* ravlaed commitment date* for It<n 23 of App Ct
IE Ifltp Reptt BO-239/81-19, 30-260/81-19 ti 30-296/81-191.
Iten C.2 e-t App A to IE Insp Repts 30-239/92-la, 3Q-a6Q/B2-12
& 30-37&/B2-12.
LEMIB.R C. DIvilUn oC Project & Residnt Programs 38/09/23
PARR1S,HO. Tennem. Valley Authority, lp 13345 001 S4K
Flehe' &0-2S-?, fl2/09/aS, 8210010097
CU I I tfVBt)
107
--83 IOOIOIQ4 Requests ei ten si on to respond to App Ci I tern 25 in IE Insp
R*pts 50-259/at-l 1 ?. 50-26O/B1-19 *> 5O-S96/91-19 fc Item C 2 Jn
IE Imp Rents 50-S59/B2-12, 50-260/82-12 (, 50-S96/82-12
Hipor>5{>i uil] be submitted by 0301 Ol 4 021 101 , respect! vly
HILLS, L M Tennessee Valley Authority 82/09/01 O'REILLY, J P
Region 2. Office of Director Ip 15565 002 24X
Fichi 50-359,32/09/22.0210010097
81 12210339 Faru/ards description of events b resulting action rfl high
circulating current asjociated u/Inverter output due to
lack of circuit tuning IE circular or info notice ihoulrf be
issued to addres-s Issue
HLTEI1ES.C J Director's Office Gl/lS/lO JORDAN, E L
Director's Office 4pp 15731 36], SAX Fiche 50-000,02/06/28.
021O01O008
= 210010326 Fnrcjards imnmary of 020908 enforcement meeting u/uti 1 to
dicun corrective actions re leakage during shipment of lou
level uastt tt util plans for improving employee training
O'fieiLLV, J P Region 2, Office of Director 02/09/22 PARRIS, H
Tennessee Valley Authority 4pp 15569 IBS 24 X
ffche 50-359.62/09/33,0210010326
2IQOIO290 Act receipt at supplemental 920901 I tr informing NRC of
tep* taken to correct Violation B noted in IE Imp Repts
50-359/81-36, 5Q~aAO/B2-26 i- 5O-296/01-26
LEWIS, fl C Dwliion of Project & Resident Programs 32/09/34
F ARRIS, HG Tennessee Valley Authority Ip 15573 183 24X
Fuhe SO-2S?, 82/09/24.0310010290
B21&0600B2 "Summary of Ofc of Analy*lt & Evaluation of Operational Data
Analysts ti Evaluation of Broims Ferrv Unit 3 Partial Failure
to Scram Event of a 00 62 a "
LANIK.O Director's Office SI/1I/30 H2pp 19731 263 24X
Fiche 50-OOO, 62/06/23, B21O010OOB
B210080015 Addl response to FOIA request for 19 categories of info re
nuclear reactor events & -safety problem* Forwards documents
listed in App A Document! In App B comple>belg withheld (i-ef
FOIA Eemptiort S)
FELTON,J rl Division of Rules and Records 02/O7/12 UDELL, R A
Critical Hist Energy Project 9pp 13ti3 O27 2<tX
Fiche 50-000,82/07/13,6210000015
-631OOJO30* ForiLrards revised response to NRC 811028 1 tr re Violation D
noted in IE Imp Repts 30-359/62-26,50-260/82-26 &
EO-29&/8S-26 Corrective actions R factor returned to within
linili t revision to Tech Spec approved
t11LL.S f L ft Tennessee Valley Authority 02/09/01 O'REILLY.J P
Region 2, Office of Director 3pfi 18573 101 24X
:iO22O390 Foriiiartf* IE Insp fiepts 50-239/02-29,50-260/02-29 t,
5O-a76/e5~S9 on 02O90A-10 No noncomp 1 iance notod
UERHELLI.D M Division of Project fc Resident Programs B2/09/3O
PARfltS.K G Tennessee Valley Authority Kpp 1 5779 230 24X
Fiefte 50-259. B2/09/30. 0210220390
B310230-SO! IE Insp Repts 5O-259/82-29, 50-S60/B2-29 t< 50-396/02-29 on
6207D&-IO No noncomp 1 lane E noted Major areas Inspected Unit
2 refueling fr naint outage ti procedural compliance of
^l^alt^ pfiys ics- re lated practices by workers
COi-LINrg,r R , BARR.K P Division of Enoineering & Technical
Pros-rami 62/09/27 Spp 13779 222 24X Ficne 30-239,02/09/30,
eaiO22t>390
B2100fl0197 NRC operation* etr uiage chart r events at facilities
* NRC - No detailed Affiliation Given 82/07/10 Ip IS its 2S1
24X Fiche SO-000, B2/07/12, 021 OOSOO I 3
8210060265 Foriuardi LER ea-O42/OaL-0
OREENrH J Tannesiea Valleg Authority es-/C9/3B O'REILLY, J P
Region S, Office of Director. Ip 19621 0,A SAX
Fiche 30-296, 02/09/23, 621 006O265
~a2IOOiOH7O LGR B2-043/03C-0 on 020831 , d iese 1 generator 3C right bank
*lr starteri failed to develop mln rpm Caused by looie bolt*
on right lank air start valve 833-3 Units tightened
PORTER, MR Tenn5iB3 Valley Authoritg, 0S/09/20 Region 3,
Office of Director Sp p 154H1 077 24 X Fiehe 50-396, 92/09/20,
821OO60265
S210130157 Forwards LEU Ba-O43/03L-O
OREEH,H d Tenneasea Vallny Authority 82/IO/07 O'HEILLV, J P
fi B lon 2, Office of Oirector Ip. 15673 O77. 34X
Flche 30-296, 82/10/07,6310130157
IQO3Q2I9 Foriuard-s revised request for relief from Insdrvice Insp 7 re
I nj cc t s s i, h le uelds In piping penetration! tt under rigid pipe
rtTainti Best effort visual el am will be performed during
ivi hydrostatic pressure test
1ILLS, L M Tennessee Valley Authority 82/10/04 DENTON, H, R
3*fice of Nuclear Reactor Regulation, Director 3pp 1S63B 083
?4X Fiche 50-259.82/10/04,8210080219
--0210130162 LEfl 82-043/03L-O on 020909 r 460-vo It reactor motor operated
valve board 3DN motor-generator set rsmnved from svc whan
g*n*rator/f lywheel bill aaaring bee am* naliy Cau*d by lack
of Adequate lubricant film on bearing Bearing replaced
AARON, J, A nnneisee Vail eg Authority 82/10/07 Region S,
Office of Director Spp 13673 070 24* Fiche 50-296,82/10/07,
B21OI30157
! 3110533 IE Info Notice 80-35, Suppl 1, "Ueakind (. Dlllodged I-1SS
.Tf lant Sefds " Svc list encl
QBB.L. I Division of Fuel Facilities, Materials
S-'IO/Ofi Consolidated Edison Co of Neui Vart
'4X Ftche SO-OOO, B3/IO/Oi, 8208190233
Safeguards
66pp 19761 2&0
d 1502 IS F<jruai-d update of present work b schedule for
tap 1 vflKntaHon c-f insps required under IE Bulletins 79-03 &
9-14 Friai* II evaluation will not be completed until
3OBOI
ILLS. L H Tennessee Valley Authority 03/10/07 O'REILLY, J P
gicm 2. Oftici at Diractor 2pp 13705 276 34X
IChp 5O-259. B2/1CV07, 8210150318
]E BulUtin 02-03, "Stress Corrosion Cracklna in Thick-
ill. Lir5pe-Dijimter, Stainless 0teel,Recirculatlon Sij
ip Ing at DWH Plants " Svc Hit encl
tYOUHO.ft C Director's Office, Office of Inspection and
-.forcemvnt SZ/IO/14 Consolidated Edison Co of Neu York
ISpp I5B10 125 24X Fiche 50-000,82/10/14,0200190238
occurre<ncesi LCRs Ii related cor reipondence
8210290231 Foruard* updated LER 02-O37/01X-1
GflEEIJ'H J Tennessee Valley Authority 92/10/14 O'REILLY, J, P,
Region 2, Office of Director Ip 15QS3 231 24X
Fich*- so-296, ea/io/i 4,
--0ai02 < ?0232 Updated LER Ba-037/OlX-l on B20H24, flur ing Instrumentation
callbr for corB standby coaling *yi Euppresvion chamber,
cillbr v*lve on level tuiitth US -73- 57 A found open rendering
tuiltchei inoperable Cauied by open valve Valve closed
IRBV-B J Tennessee ValUy Author! tij B2/10/13 Region 2,
Office of Director 2pp 15053,232 S4X Fiche 50-296,82/10/14,
8310270231
T Hearing tranicr Ipts an nc-n-antltruit mabtri
3210070133 Testimony of M Hutton answering ASLAU questloni on lou
level raduast* mgt optloni Availability of <idei|uate *pace
to dispose of lou levvl waitea in n*t 3 yri orctrtain
Ctrtif 1 cat* of Svc ncl
HUTTOM, JW TennesseB V.lleu Authority B2/HVOI, 12pp
15637 031 24X Fiche 50-2IS9, B2/IO/OI , 82J007O133
K12O129 AJvi*ei of need for in~dpth evaluation of potential for
,accptab] e interaction betueen control rod drive lye b
ni*ntiat control air sys Margin of safety Inherent in
cvnsed tf*ilgn basis should he promptly restored
CHELSOM.C Director's Offic* 80/08/10 DENTON, H, R Office of
clear flnJctor Regulation, Director 3pp 15692,130 24X
ch*. 3Q-296, eo/OBJ'ie,a2101201S9
Retponrfi to FOIA request for 19 categories of documinti r
rl*ar reactor event* d safty problems. Forward* documents
t<f In App A
LTON.J M flivliion. of Rules and Records. 02/06/B8 UDELL, tt. ft
lttc*t Hait Energy Project ISpp 19727 009 24X
cha 5O-OOO> BS/Ot/SB.SSlOOtOOOB.
DOCKET 60-298 CQOPEfi NUCUEAR STATION
F Se-curifcyr medfcali emergency & fir protsction plans
SS 100 10038 Foruardi rept of change to af*juT<f* plan, Rvltion 0,
Rept Withheld (rejf 10CFR2. 79O ti 10CFR73.21).
PILANT'J.H Ntbraska Public Pouer Diitrict. 82/O9/13,
VASSALLO, D B Dperatint Rtactors Branch 2 tp 19967' 153 34 X
Fiche 3O-39S, B2/09/13, 8210010O98
8210130318 Forward! change! to Revielon 1 tfi laffguardi plan, Changes
uitJiheld (raf iOCFRZ 790 & 10CFR73 21)
PILANT. J,M, NeJ>rska Public Pouer Dlttrict BS/10/04, VftSflALD, D. B.
Opirating Reactori Branch Z Spp 13473 l&O 24X
Fiche- SO-29B, B2/ 10/04, 82I013031B
108
DOCKETED ITEMS
B2101B0320 Forwariil QE proprietary uniqiri analvilt Mpti for facility
Riptt withheld (nr loCFfla 7*501
&1ESEL.B. Operating R*4ttor Branch 2 B2/IO/0* BUBRAMONI AN. N
Franklin Inttltutr/Franll In Research Gentir Ip 11746, CIS 24 X
Flchi SO-29B, 62/10/04,8210130320
B 8102402 17 Forward! raiponie to NRC B2QB09 Itr forwarding notlct o*
violation fc propoiid imposition of civil penalty t< order
modifying llcinse Magnitude of infurctmtnt action not
warrant id
JONES, <! H Nebraska Public Poutr OlttrUt 82/10/07 DCVDUNOufl C
Director's Offlcin Office of tnipectton and EnfcTcimtnt. S4pp
13B04 OBI, B4X Fiefie 50-E9B, B2/10/OJ, B210240217,
BS10220254 Submit! update to B20416 reiponte to 0-tnerle Ltr SB-OS.
confirming optrabllltii t< ln*tlltion ol poit-Trll
requirement p ir NUiREQ-0737, Itim II F 1 n acci-dtnt
Monitor tnj Irntrujnmtfttion, noble gat b lodint pertlculate
PILANT.J H Nebrecka Public Paiuer Dittriet B2/10/1-B
E(EENHUT,D 9 Civilian of Uetntlnj Ip 1S774 226 24 X
Ficht SQ-29B, 82/io/iB.
8JI0260298 For-uardi IE Safeguard* Imp Hept 5Q-299/B2-2B on
aaOBaO-om-Notlte of violation withheld (r*f IOCFR73 31).
MADSEfliO 1 L DIvltLnn o-f Htiidinti Rttctor Project t> Enginitring
Pregnni, S3 /1 0/22 PILANT.J h Mtbrijln Public Poiuir Dlitrict.
2(>p la01'3B9 S4X Flch,aO-3
B2I02i030t IE 9*#igurdt R.pt 80-298/92-13 an 020330-0901 Mnncaffp lU
not>d,ditil* ulthhfld <rtf 10CFH73 91)
CALEWELLffi A , HEU.Y. J A F. R)ion 4> Of lie* of Dlrtcti>r
33/10/14 Ip, 19301,360 S4K Flch*' 30-29B, 62/10/22, S21GSAOE9B
P OptrHnfl llcinti *tg documtnti !
0210120801 Fflrwjirdf ordir fflftJItglng 910113 ordiT' n tindlng eanpltlon
rfftti for Ini t]l4tlan of plant fflodt ntidiil to <0inplu u/
NUSEO-0641. App A to ttdrt of Full Cyll 9,
'D,&, Operating Ructoet Bl-ineh a e?/0?/19, PILANT.JM,
Pifbllc Poutr DUtrict, 2pp, 134B^;BO<? 24 X
-sa[01SOS70 QrAtt madl^ijlng BlOJia Qrdir.tittndlng conplitlon dit far
intt*Utlon of pUnt modi n4id to comply u/NURE&-06ilr
App A t itifb of Full Cijclt "?,
EI0EWHJT,D. *. DtvHUn of Hctn*ing, 02/09/1B. hlibrifk* Public
Pouir Dmrlet, 6pf, 18684:211, 84X Fichu 3Q-29B, fla/09/1 B;
aaioiaoBS4.
ej!02fiOE17 Forward! raipon** to NRC 8BOS09 Itr foruapd juj notiti oi
violation t, propond impontion of civil pvnaltij t ordtr-
nadlfqing He enit Magnitude of n forte men t action not
warranted
JGWeB.C R Ntbraika Public Pour Dutriet flS/10/07 OEVDIJHJ H
Dirtctor'* Offitt, Offlei of Inlpoetion and En fore am tut Bin,
15804 OSI Z4K Fieha 50-290.02/10/07,0310240217
8209190239 IE Dull. tin 02-03, "Strut Corrosion Clicking in Ihm-
Wall,Lrg-Di jmi t>r> Stainlt ti Btial, Rc Ircu lat i an Bn,
Pipinj at BWR Plant* " Bvc Hit tncl
DEVOl/NO-R C Birestor'i Offic*, Office of lnp act ifln *i,j
Enforcimnt 62/10/14 Coniolidated Ediion Co of Hiu Van
lISpp 15S10 1HS 24)i Fiche 50-000, 92/10/ 14. 33001^0230
9210220130 Acfc ricaipt of 820910 Itr informing NHC of ttept \,im t,
corrrct violattorn not*d In IE Imp Rpt 50-2?a/ga-|i
MADBEH.O L EMvlilon of Rftidnt, Rtactor Projett t. Enoiiurlri
Projpami B2/10/14 PILWJT.J M Nebraska Public Powtr DlilrlM
Ip 19779 US 24X Flch* 50-B9B. 92/ 10/14, B2103B0130
-8210220134 Rfipandt to NRC B20913 Itr r wiolationi notrt m IE j
ftept 50-298/02-16 Cocrtctive aetioni tntrg uiayi into *
*fPectid *ri paitiil, locked or obnrviblt to radiographii
Ddc 1 p 1 inir ij action taltin re Procedure 7 4 4,Rvifjon 1?
PILAMT,J M Ntbraika Public Power Diitrict &2/O9/10
MADBEH.O L Division of R.tidont, Reactor Project fc Enjirinr,
Prosi-ami 3pp 13778 117 B4K Fieh. 30-29H, B2/10/ H,
S21026032S Foruard* rivitioni to S20329 Relief Requatt RP-0! i f-
re lnsrvic Insp/teitlnj requirements for pumps fc vdlvti
PCLANf, J M Nebraska Public Poioer District 62/10/19
VABS^LLOrD B Operating Riactnrs Branch 2 4tp 13795 31* :,.
Flehu- SO-29S, 92/10/19,8B10B603SB
92102AO299 Forward* IE Safeauardt Inp Rapt 30-K7a/fl2-2B on
620830-0901 Notice of violation withheld (rf 10CFf?73 ai;
MADSENiO L Division of Ruident, Reactor Project i Enolnrtmi
Programs B2/1O/S2 PILANT.J.M Nibrask* Public POLI*T District
2pp 1BB01 389 2flX Fiche 50-299, 82/10/28,8210360298
Hanivn
--821-0260301 IE gafguardl fltpt BO-2?B/flia-2S on
notad- dtl U uithheld (ref 10CFR73 SI)
CALDUEUU, R A., KELLV, J A F Region 4, Office of Director
B2/10/14 Ip, 1SB01 360 24X Flche SO-H^a, B2/10/2B, BBIOJt-
fl. Riportabli oecurrncs, UERs t rilated corrnpondenee
9210270300 Informt thit tntigrjtlon of- NUflBO-0737, Itun II.K.3, 27
"CetMiitn flif t-tvil" i It I.D.I, "Control Room Dtiljn
PIT ull eaOfSO eamnltinenti uJll tllminati opirator
ult(ti( from ei*nglng uittr livel,
. D, B, Op*ntlng Reton Branch 9, 52/IO/ia, P1LAFJT.J.H,
Pot He Peutr Olitrltt, 2pp, lBS3ii33?, S4X
Fi chi! SO-S^a, 93/10/12! S310a7030S,
921001000B Rstpondi to FOIA riquest for 19 cabeflorlei of
nucltar flactor tventi ti lafetu problem) Forwarifi dotu
Utfi> in App ft
FELTONiJ M Divlelon of Rules and Records BZJObfZB
CPlticil Ha*i En*rgu Project. ISpp 15727,009 24)!
Flcht; 90-000, 02/06/20,6210010008,
6210230384 flubmits upditi t<i 8204 li rtlpfrnii to 0narle Ltr 93-08.
confirming apiribllltu * InitiLlatlcn of pait-THI
fMulrininti pr HUflEO-0737, I6t n II, P. 1 rt tec^int
fflnltorlng Initrunintatianinabli gt fc lodlm j*rtteulti,
PltANTrJ.M, N*bra.ik* Public Power Dlitrlct. S2/10/1B.
fl, 0. DWlden o# Lletnilr;, If, i?74nBSB. MX
WB. 6a/io/ie,aaioaaoaB4.
Forutfrdi ravliloni tb BaMa? Rillif Riquift* RP-03 It HP-04
PI InifFvlc* inip/*tH(flj riquirtnint* far punpi t vjlvn,
PILANr. J.H. Mfbriti Public Pguir DUtrlet, 82/10/H,
VAIflALLOiD.B, 0?ir**lng RucUn Jtinch 0. +)), lB799j344, B4V
r*UkiiM-8fliU/lQ/lf,H10MOaRI.
Bubniti juitmeitlnn far (entinu.J flint opiratlon n OE de
ntrllct. r*Uwr* e/ M fflntro]Jr< dui to fitrifi
itivlren uiil net ^ict nfi ihutdoyn, Cntr(-llri uill
Nibriika Public "ouir Dliirfct.
D, B. Oj>ri<ilnfl RactM Branch S. Ip,
P
Bullltlni h "Ttiipondiiiti
IB in* NO*UI io-as, suppi i, "(.lining
ftitat," flvc Hit mcl,
X 1 ' 10 ?^*/!!'!,?" 11 !"* 1 ' "''UU I- Bifi
Oanialidititl Edlien CD. of Ntu Vark. ftiiip,
"
DOCKET W-301 POINT BEACH NUCLEAR PUNT, UNIT S
F. SuHtg. medical, emergency b fire protection plant
flit 0040 119 DlieuiiBi rtviiion of pUnt emergency reipons* ureiH
i(ieiCij(nj ntceiiari; precaution* requlrad before poit-
aesldent rt-entry into *u>fllrij bldg or facade, In ropeni*
to B20914 raqueit for Info re NUREO-0737, ItM II D,2
FAY*C,H. Ultconlin Electric Pouttr Co. 88/O9/24 DENT OH. H *
Office of NoeJ*p fl*tor ffejulatjan, Director, CtrtftK.fl A
Opfratlr-g fleactoM Branch 3, 2pp IS9B1.201. 24K
Flch*: 30-266. gz/Of/24, 8210040H9
9210090373 Furui-<ft aildl Info refl.uilted In NRC B209li til<n It
lupport utll 920630 App R entmptlon requett, Eight ovirtlti
driwinei ene 1 , Apirtun cardi an availabli in PDR,
FAYrC.H. Wliconlin Elietrlc Power Co. 82/09/29, DEHTWH*
Drf let of Nuc teat- Ructor Rijulition, Dlrvctar CLARK, (1 A
Djrtln Rc*cn Branch 3 13pp. 18A06- 047. 24X
for n*rginii| it<fl
B3100BQ054 Forward! addl info n propond ma
ctr.
FAViC U, UUeemln Electric Pouir Co 82/09/30. DENIOM.m
Qttitt of NIK 1 ear fine tor Regulation, Director. Ifcsp IJM3 3
S4X Flehi: SO-aii, BS/09/30, B2100SOOD4.
B210S70396 Riltat** public version of rivlteit mirgnc v tint
Impltmintina pracedurii.
PELTOHrJ. H. Dlvlilon of Rulit and Racords. 93/10/DQ. tn**^
Branch, Ip. 19834.001. 24X Rent" BO-Wi.eS'H^l
DOCKETED ITEMS
109
6210270259 Forwards public version of revised emergency plan
implementing procedures. inc luding Procedures EPIP 1 1 re
initial classification, EPIP 1 3 re estimation of source
term t EPIP l 4 re radiological dose evaluation
FA/, C W Wisconsin Etuctric Power Co B2/09/10 DENTON, H R
Office of Nuclear Reactor Regulation, Director CLARK, R A
Operating Reactors Branch 3 4pp 15334 002 34*
FicUB 5O-266, 82/1O/OB, B210270236
SS1O27-0241 Public version of revised emergency plan implementing
procedures, inc luding Procedures EPIP 1 1 re Initial
c lass l f l c at ion. EPIP 1 3 re estimation of source term fc
EPIP 1 4 re radiological dose evaluation
* Wisconsin Electric Poiuer Co 82/09/10 244pp 1 5834 006 24X
Fjche 50-266,82/10/09.8310270256
BS1Q150471 Foruards addl info re S2O630 requests for exemption from
1 CCFR5O App f? concerning Fire Area 9, control room t.
vertical cable trays, in response to B2I001 t. 06 t e Icons
in, / SvjlC H/16 oversne drawings Aperture cards in PDR
FAY.C H Wisconsin Electric Power Co B2/10/11 DENTON, H R
Office of Muclear Reactor Regulation, Director CLARK, R A
Ope-ra'.ing Reactors Branch 3 12pp 15734 350 24X
Fiche 50-266,82/10/11.0210150471
8310040414 Forward* Amands A3 (t 6S to Licenses DPR-24 i DPR-37,
respectively, safety evaluation * notice of iisuance b
availability Amend* revise insorvice inp Tech Specs
CLARK. R A Operating Reactors Branch 3 62/08/31 FAY, C W
Wisconsin Electric Pauer Co 5pp 13397 134 24X
Fiche 50-266, B2/OB/31.B2100'1Q414
B21004042Q Amonds 63 & 6B to Licenses DPR-24 b DPR-27. respec t Ive lyi
revising language of Tech Spec* re Inservice imp
requirements of safety class component! to conform
'J/1OCFRSO 33
CLARK, R A Operating Reactors Branch 3 B2/OB/31 16pp
15597 37 24X Fiche SO-266, B2/QO/31 . B21 0040414
8210040429 Safety evaluation supporting Amends 63 & 68 to Licenses
DPR-24 t/ DPR-27, respectively
* Office at Nuclear Reactor Regulation, Director 82/08/31 4pp
1S597 135 24X Fiche 30~2ifi, 32/03/31, BS 10040414
B21004O4S7 Notice of issuance & availability op Amend* 63 & -60 *o
License* DPR-24 & DPR-27, respec tively
CLARK, R A Operating Reactor* Branch 3 B3/09/3I 3pp
15997 179 24X Fiche 50-366. 82/00/31, B210040414
Ad juif natory
apondence
3310050251 ttsmorandum >< order granting summary disposition of all WI
Environ Decade issues except issue of demon strati on of
a d e qi/aEy of eddy current testing tp detect cracking
BL.OCH, P C , KLINE, J R < PAXTON. H C Atomic Safety and Licens ii>g
Board Panel 82/1O/QI Wisconsin's Environmental Decade 19pp
306 24X Ficho 50-266, S2/ 10/01 , B21O050251
otice of 6^1117-20 evidentiary hearing in Two Rivers. HI rt
a tfe nuactj of inservice nondestructive testing of sleeves
tubes Prehearin; conference to be held after hearing
BLOCK. P D Atomic Safety and Licensing Board Panel 82/10/15 lp
325 24X Fictie 50-266. 83/ IO/ 15. B310200027
B310050005 Adviies that error analysis of reactor vesiel water leve-1
Intruni*ntaticin ay requested In NRC BSO61? 1 tr uill a*
available by 330115
FAV.C W Wisconsin Electric Poiur Co aa/O9/H9 DEMrON, H R
Office of Nuclear Reactor Regtila tion. Director CLARK' R A
Operatino Heactoi-a Branch 3 lp ]S605aOS 24X
Fiche 50-266, B2/09/29. S21OOMOO5
82100SOOS5 Foruiarils infa rea,uiteiJ in NRC B2Oi30 Itr r Implementation
of TMI Item II D 3. "Post-rteciBent Sampling 8ys " Addl
requirements re backup pouier lource* for lab are beyond
scop* of original NUREO-0737 implementation schedule
BURSTEIN, S Wiicansin Electric Pomer Co 82/09/30 DENTON, H R
Officn of Nuclear Reactor Regulation- Director CLARK, P A
Oporating Reactors Branch 3 SIpp 15603 307 S4X
Fiche 50-2ii, B3/09/30. B21O050055
Notice of relocation of B21H7-20 hearing From Tuo RiVerB.MI
ta Mi luaut ee, UI Limited appearance statements uill be taken
at original location on 921117
BLOCK. P H Atomic Safety and Licensing Hoard Panel 32/10/21 lp
35] 24* Fiche 50-266, B2/10/21 . B310220H42
license stage documents J- correspondence
Recommends review of design of int erconection between
r-edundant safety-related electrical load groups Design
should be modified to assure full compliance in/Hog Guide
1 A
Director's Office 00/OB/27 DENTON. H R Director's
2pp 157B2 208 24X Fiche 50-266,80/09/27,8310210009
Office
Responds to FDIA request for If categories of documents re
nuclear t-eactror events & safety problems Forwards documents
li-sted in App A
FELTDfJ. M Division of Rules and Recorda S2/06/2B UDELL , R A
Critical Mass Energy Project ISpp 15727 005 34X
Fiche 50-000. B2/O6/2B. B21OOI0008
-- eOO314O204 Faruarils evaluation of proposed Tech Specs change to operate
facility at 3350 or 2000 psia Proposed changes are
acceptable W/o end
CHECK, P S Reactor Safety Branch 77/12/26 9CHWENCER. A
Operating Reactors Branch 1 (Pre 300428) 6pp 15727 030 24X
Fiche 5O-OOO. B2/06/38, 921OOiOOO8
QS1OO70OO7 Responds to F01A request for eight categories of records re
s team generators t steam turbines App A documents provided
in R Udell FtllA Request 81-313 Forwards documents listed in
It
, J M Division of Rules and Records 82/08/10 LONG, D J
Wintfir-op. Btimson, Putnam & Roberts 9pp 1 SMS 063 B4X
F*iehe 50-000, B2/OB/10. B210070007
Bl IO290030 Advises that technical reviewers providing input for SER
must be available to testify at 01IO39-31 hearings Schedule
tt agenda info encl
CL.ARK,R A Operating Reactors Branch 3 81/10/20 MURPHY ,E .
^EHEKIAS, J . HO, T NRC - No Detailed Affiliation Given 3pP
15643 271 24X Fiche 50-000,82/08/10,9210070007,
S11O30O460 Requists evaluation by 811023 of util S10708 application for
license anend to permit steam generator tuba sleeving Info
to bfl presented at ASLB 811039-30 hearing
COLBURH. T Operating Reactors Branch 3 Bl/10/19 BALLARD, R. L
Environmental Engineering Branch lp 15643 270 24X
f="*chfl 30-000,83/08/10,8810070007
8210050222 Application to amend Licenses DPR-24 << DPR-27. revis i up spent
fuel pool poiioh surveillance specimen location & clarifying
condition! for operating poiuer-operat ed relief valves
FAY,C W Wisconsin Electric Power Co 03/09/30 DEN TON, H R
QffiCB of Muclear Reactor Regulation, Director, 3pp 15609 054
24X Fiche 50-266, B2/07/30, BB1005O232
6210030231 Propotad Tech Spec* revising spent fuel pool poison
surveillance specimen location b clarifying condition for
operating p our-aperated relief valve*
Miitonsin Electric Power Co S2/O9/30 3pp 13609 OS9 2-VX
Fiche 90-866.82^09/30,3210030233
8210290426 ForuardB Amends 64 4 69 to Licenses DPR-24 i DPR-27,
reipectivelij' safety evaluation & notice at issuance t.
availability Aminds modify operation i surveillance testing
requirements of containment purge supply & eihaust valves
COLBURN.T Operating Reactors Branch 3 B2/10/04 FAV.C W
Wiiconiiti Electric Puuer Co 4pp 1 SB63 143 24X
Fiche 30-866.82/10/04,0210290426
8310890431 Amend* t4 fc 69 to Licenses DPR-24 & DPR-27. reifiec t ive ly.
modifying operation t> curve! 1 1-ance testing requirements of
containment purge supply & aiheust Isolation valvei t
terminology of Tech Spec 15 4.4 an testing,
CLARK, R A Operating Reactor* Branch 3 83/10/04 12pp
13963. 184 84X Fiche 5O-Sfii, H3V10/O4J B210290426
B2i02904Q6 Safety evaluation supporting Amends 64 b 69 to Licenses
DPR-24 It DPR-27, respectively
^ Office of Nuclaar Reactor Regulation. Director 82/10/04 5pp
15BS3 146 24X Fiche 50-266- B2/10/04, 8210390426
S21029O441 Notice o-f Issuance Si availabllitv of Amends 64 h &9 to
License* DPR-24 & DPR-27, respective ly
CLARK.R A Operating Reactors Branch 3 B2/10/04 2pp,
1SB63 151 24X Fiche 5Q-St,ti, BH/10/04, B2I03904S6
92101902B4 Advises of mod to RGB 441 vent sys to prevent operation of
power operated valves during normal plant operation, per
821012 telcon Physical restraining device fitted an or aver
valve operator switch
FAY,C W Wisconsin Electric Power Co- 82/10/19 DEMTON.H, R
Office of Nuclear Reactor Rigulatlani Director sCLARKi R. A
Operating Reactore Branch 3 lp J5743'177 24X
Fiche SO-266i B2/1O/13, 83IOJ90HB4
110
DOCKETED ITEMb
6310270594 Forwards Amends 65 & 7O to (.Icense-i DPH-24 t. DPft-27,
respec 1 1 vely. aft"j evaluation if notice of issuance &
availab 1 litg Amend allots relaxation of monthly turbine it op
t. governor valwe tetts during end of cycle operation
COLBURN, T Operating Reactors Branch 3 82/10/15 FAY. C H
Wisconsin Electric Pauer Co 3pp 1 5036 316 24X
Fiche 50-266. B2/10/19.B210270S94
--B2I0270H97 Amend* 65 t 70 to Llceniet DPR-24 t DPR-E7, respect ivelij.
allotting T lai-stl on of monthly turbine it op S< governor valve
tiiti during end af cycle operation
CLARK, R A Operating fleactor Branch 3 92/10/15 7pp
I5S3& 3JS H4X Fiche 30-366,62/10/15-6310370391
B2 10270302 Safety evaluation supporting Amend* 65 t TO to Llc*nc.ia
DPft-24 & DPR-27. respectively
aeficR af NuclHar Reactor .Regulation, Director 82/10/15 Kpn
15836 323 24K Finne 90-266. a2/lO/15.B210B70294
5210270303 Notice of liuanc* 6 availability of Amend* 65 t 70 to
License! DPR-24 & DPfl-27, resp ectlve li)
CLARK. R A Operating Reactor* Branch 3 62/10/15 Spp
13036 327 24X Flcln 3O-264, 93/IO/1S, B21 0370294
5210260476 Application to amend Licenses DPfl-24 & DPR-27. r*vi 1 1 ng Tech
Spec re administrative control of hiofi radiation great
FAV.C H Wisconsin Electric Pousr Co 83/10/19 DENTQN. H R
Office of Nuclear Reactor Regulation. Director 2pp 1SBQ6 933
24X Fiche 90-266rB2/H>/I<J,B210260476
B210S60479 Proposed Toch Spec change* Incorporating revisions re
administrative control of high radiation areas
Wisconsin Electric Pouuer Co B2/10/I9 lp ISSOi 235 24X
Ftchi 50-266, 82/10/19, B2I02C.0476
-BI0727D179 "Shaking Tabla Study of SinglB-BtDfu Maianru llnui.. u,i ,
Tf*t Structure* J i 3 " V i.v i
CULKAM, P , HAVES.R L , CLOUGH.R H California. Um v of Brl.i
UCD/EERC-79/23 V01 79/09/30 275pp Availatl, at HtlS
09132 277 24X Fich 50-266, Ql/07/ 1 7, BIO727QI56
-9I072701B2 "ShaUng Table Studg of Slnale-Btopy Maonru Mount. ^oll
T*t Structorei 364"
aULAH, P . MAVeS.R L . CLOUOH.R U California, Unw ol, Brl.l
UCB/EERC-79/24 V02 7^/07/30 300pp O9153 IBfl a*
Fiche 50-264,61/07/17. BI07270I56
-S107270195 "Shaking Table Study nf Bi ng la-StDry HSSOTIFV tlouw
Sunm.irg.CeinclulDn9 t Recommendations "
CLOUOH. R H , HAYES, R L , OULKAH. P California, Univ ol, D
UCB/GERC-79/23 V03 79/09/30 HOpp Available al WTIB
O9IS4 07B 24X FichB 50-266. Bl /07/17. Q1072701S6
-BI0727OIBB "Cyclic Shear Testi of Maionry Plon.Vol J - T..[ n,, i t .
MAVEa.n L . OHATE.Y , CUOUOH. R W CflUfornla, Unlv of, B.ri.j..
EERC 7fi-B 76/09/31 lOSpp 09154 1B2 24X
Flche 50-266, 81/07/17,0107370156
-B10727019I "Cyclic Shear Teit of Masonpy Pler,Vol B - rtrnkii.tP
Teit Riults "
MAVES.R L , OMATE.Y , CLGUOH, R W Califnrnia. Un lv nf, D.tlrU,
EERC 76-16 76/06/30 78pp 091S4 2BB 24K '
Fiche 50-266,31/07/17. 8107270156
--Bi07270l E H "Strength of Timber Roof Connectioni Subjected to
CULKAN.P , MAVES.R L , CLQUGH, R M California, Unlv e f, t
UCB/EERC-7B/17 7B/09/30 I71pp 09133 003 24X
Fiche 50~2t6,Bl/07/17pBlO7270156
&2105SOE?5 Application to amend Licen<ii DPR-&4 * DPn-27. -changing Tech
Spect re ra<tu iremants for periodic leakage rate taiting of
containment airlock door* Class I d 1 1 amend ftix encl
FAV.C H Uiiconiin Electric Powr Co 92/IO/al DEMTON.H R
Office of Nuclear Rraetcr Regulation, Director 3pp 1 5B37 B72
Q4X Fiche- 9-0-266,32/10/2 1 , 92102B02-95
S3103BQ29B Tach Spec Chan 91? Rebuilt ea,chaninj requirements (or
periodic leakage rate testing uf containment air lock doori
* Hifconiin Electric Pomer Co S2/LO/21 4pp 15837 275 24X
Flchn 50-266^2/10/21.9210280295
B2 102 9 0394 Providn ritults of cnnf Irmatoru 'nalijili drmnnitrat Ing
tli it unacteptabl* radioactive rla*f from containniint
would not take place a-l remit of (mail t>r*k LQCA In ujilch
operator action re^ulr-ac 1 fladloactlve releaie negligible
FrtY.C H. WUconfln EUctnc Power Co 02yiO'/22 CLARK, R rt
Operating Reactors Branch 3 lp 15B53 135. 24X
Fichu 50-256. 82/10/22,9210390894
Intpectmn reparti< IE Sulletini (. carrei pondtnce
810.7270154. Foruardi ad-Jl info in response to IE Bulletin. GO-1 1 re
iMftmry uallt Thirteen rapts fc 109 averilia drayinji enc3
Aperture card* am available In PDR
FAY.C.W Wliconiin Electric Pouer Cg. BI/O7/17. DEH10N.H R
Off(c< of Hut laar Reactor Rejulstlon, Director, CLARK, R Qperatinj
ReJicton BrTieh 3, 17pp. Available at NTI9 09151. 026 2 + X
Flchi 30-2i6, B1/07/17.B107270156
-8107270! 61 "Modal Canbribution to Dyti*mit Analijaii HuHi "
Computech Englnearins Girvitft. Inc H353 03, Ql/07/31
Q9131-04& 24X Flehe SO-J66, BI/07/17.8I072701B6
HSpp
-B107270166 "Cyclic Laadinj T(*t of Monru Blngle Ptr,y-i>l 1 - Haloht
to Width Ratio of 3 "
HIDALOO.f A , flAVES.R.L , HCHIVEN, H California, Ujiiv at.
Berlitl.u UCfl/EERC-7B/a7 V01 7B/U/30 I41dp Available t
MFIB 091S1-1SB 2 Flcht BO-S66, 81/07/17, 01078701 36
-31Q7S70U9 "Coellc Loading TeE of W.ionr\| QingU PlBM.Vol 2 - H.iaht
to WJiJth flatio of I. "
CHEH.B J , HIDM.QQ.P A , HAVES, B L California, Univ of-
BerU V , UCS/EEHC-TS/aa V02 7B/18/3I. IBSpp O915I 390 3
Fiche, 50-366,81/07/17, B107270JS6
-8107270174 "Cyclic Loaillna Teiei of Haionri| BlngU PlemVol 3 - Htiolit
to Width Ratio of 05,"
HIDrt(.ftO,P A , MAVEaJfl L , MCMIVEH, H D California, Wntv or,
Berleltj UCB/EEnC-7?/l2 V03 77/05/31. l&4pp Av*ilab} t
NTIS 091SB 184. 24X Fiche- 30-346,81/07/17,8107270136,
ei07270i7d "Literature Survey Transverse Strength of HaonTu
GHATE.Y . MAVES.R L , CHEN, S J California. Unlv of. Drr
UCB/ERC-77/07 77/O3/3I 119pp 09155 110 BIX
Fiche 50-2i6,BI/07/17,B1072701S6
81 07270 19B "Literature Survey Compres s 1 ve, Tensi le, Bond j, (l
Q f Masonry "
HAYES, R L , CLOUGH.n H California, Unlv of. aerially
75-15 75/06/30 2l2pp 09155 2B6 24X Fiche 50-BA6,
B107H7013&
--8107270199 "B tate-of-the-Art in Seismic Shear Strength al Httt-i,
Evaluation d Revieui "
HAVES, R L , CUOUOH, R W California, Univ of, Qarkeliy Eih,
75-31 75/10/31 H7pp 09156 135 24X Fiche SO-2i D .ul/OJJI '
8107270196
6210070007 Responds to F01A request for eight tatsgorUt ol rtrorJl'
steam generators & iteam turbines App A documents provide!
In R Vdell FQ1A Requeit Sl-313 Forwards documents llitfd In.
App D,
FELTON, J M Division of Rules and Records BH/OQ/ 1O LOW. C J
Wlnthrop. Stlnuon, Putnam (< Robert* 9pp 1564S 063 B*K
Fiefi* 50-OOO. u2/OB/10,82iOO70007
3210070139 Forwards tabulated data on tteam generator inij I wi
^a^llitlei Data should be provided to licensee)
IPPOLITD.T Operating Reactors Assciiment Branch 02/04/01
VAflOA,8 apefating Reactors Branch I. 5pp ISft^S 13] 3r
Ftche 50-000, S2/QB/1Q, B210070007
8210070172 Foriuerds info re steam generator integrity t, Inifl J
operatins PWR,per 750330 (. 21 requests Details of ftufi,
including defect Indications, tube plugging criteria 1 UIIL
plugged y{ 1 1 not be provided except for Point Beach I
OOLLER.K R Division of Reactor Licensing {NnR-1173 onl(l
79/03/24, MACCARY.fl.R Division of Technical Revltw )|ffl!-l*l]
onlyl Spp 15645 196 24X Fiche 50-000,82/00/10, t
S210O404H Forwards Amnili 63 ti 6B to Licenses DPR-24 b DPS-IT.
Tipectivlu. *afetv evluatlon << notice of iisuance t,
availability Amends rtvlie Iniervice imp Tech Specs
CLARK. R A Operating ReacUr* Branch 3, 08/09/31 FAY,* U
Ulicontin Electric Pouer Co Spp 15597 134 34X
Flche- 90-266J B2/OB/31, 8210040414
-B210040420 Amends 43 & 6B to Licensee DPR-24 t DPR-27. rn>U
reviiinj language of Tech 9peet re iniirvici Intp
requlrtwenti of lafety ctacs components to conform
U/10CFRSO. 53
CLARK, R. A Operating Reactor* Branch 3 92/08/31 lt>r
1S3?7 137 B4X Fiche. 30-266, 82/08/31,9210040414
-B21004D4SS Baf*ty evaluation supportino Amends 43 t> iB to Us^
DPR-24 1. JJPR-27.repctively,
Office of Nuclear Reactor Regulation, Director 3/01/11
1S397-1SS.. 24X Fiche 30-266.02/00/31, B2100404M
DOCKETED ITEMS
111
--204210571 "Point Bsach Nuclear Plant Units 1 1 2 Inserviee In*p
Program Technical Evaluation Ropt "
* Sclent? Applications, Inc NRC-O3-B2-096 8A1-1B6-02B-23
B2/04/15 NHC - No Detailed Affiliation Given 20pp
I55?7 159 24X Fiche 50-266, 02/08/31, B21004O414
3pp
Notice of usuancB S< availability of Amend* 63 (c 68 to
Licensee DPB-24 t, DPR-27- respec ti ve lu
CLAW,!? A Opsrating Reactors Branch 3 B2/OB/31
Ficha 50-346,82/09/31,8310040414
B2 100 4 0333 Updated LER B2-003/OIT-1 on B307S7, d i ecovered S of 3 level
instrument* on C baric AC id storage tank powered from common
source Cause not determined due to poor early maint of
document* Miring corrected
FAY, C W Hisconiln Electric Fouler Co BS/Q1/S3 Region 3,
Office of Director 5pp I9616.O23 24 X Ficne 90-301,82/09/30,
B31O060339
T Hearing transcript* on non-antitrust matter*
21GQ501S4 Forwards IE Inap Repts 50-366/83-13 (. 50-301/02-13 on
920303-04 ft 0615 t, notice at violation
^FPPLER.J Region 3. Office of Diroctor B3/09/1S BURSTEIN, 8
Wisconsin Electric Power CD 3pp 15611 113 24X
Fithe 5Q-246. H2/09/15, B21005O106
8210080053 Transcript of B210Q6 telephone conference to diicun
rescheduling of hearing in Wasd ing ton, DC Pp 1,342-1,352
* Atomic Safety and Licensing Board Panel B2/LO/0& IBpp
19643 2B4 24X Fiche 50-266, B2/1O/O6. 8210060052
-S2100501"?.! flotice of violation from insp on 030503-04 t, 0615
PEPPLCR.J G Region 3, Office of Director 83/09/15 3pp
15f.ll 1IB 24X Fiche 50-36i, 03/09/ 15,6210050186
DOCKET 50-302 CRVSTAL RIVER NUCLEAR PLANT, UNIT 3
F Security, medical, emergency tt fire pro-tee t Lou plani
-B2IO050S05 IE Insp Ropts SO-366/B3-12 L 50-301-02-12 on B20503-04 S,
Obis Nontonpliarico noted failure to control access to high
radiation areas ! failure to follow approved procedures
LOVENDALE. P C , HrtGUE.fi L , GREGEH. L R Region 3, Office nf
Director Q3/07/13 Spp 15611 121 34X Fiche 50-266,83/09/15,
B21005Q1B&
82 10270 229 Forwards IE Safeguards Imp Rept 50-303/83-17 on 630706-09
& notice of v iolat i on. Not i ce of violation & rept detail-!
withhold (re* 10CFR73.21)
LEU 18. R C Division of Pro-ject V Rflildtnt Programi B2/07/S6
HANCOCK, J A Florida Power Corp Spp. 15B23.O07 24X
Fiche 50-302. 62/07/36.0210270329
32 1 0050356 Requests relief from ASME Section XI. inservice inp
requirements re frequency of reactor veifial interior elam
FAV, C !J Wisconsin Electric Power CD 0S/09/39 DENTQNi H R
Ofr-icB of Nuclear Reactor Regulation. Director CLARK- R A
Operating Reactors Branch 3 4pp 15610 SBC, 31X
FicSe 50-266,02/09/29,0210050356
031037023? IE Safeguard. Imp Kept SO-SOa/BB-l? On B3Q7Ql,-Q1
Noncampllance noted failirre to initiate adequate
compensator v meaturei Oetaili withheld (ref 1OCFR7J 31)
PERNV, C , MCOUlflE. D R Dlv(*ion of Engineering < Tochnical
Programs B2/O7/22, Iji 19823 OO9. 34 X Fl ctia, 5O-302, B2/07/26-
8310270229
Saiiit ! ?066 I J FoTuarifs IE Inap Rapt* SO-266/B2-20 t, SO-30I/02-SO on
No noncompl lanco noted
S Division of Engineering I Technical program* 03/10/O4
ECKSTEIN. S Uisconstn Electric Power Co Epp I573B 152 24X
Ficde 50-266,02/10/04,0210190669
S2IOI9067S IE Imp Repts 50-266/82-20 & 30-301/02-20 on B20914-16
Mo nonconp 1 lance noted Major areas inspected surveillance
fr calibr jirocedurea !< performance historij
HAS5F.R A , PEBCHEL.J H , HAWKINS. F C Division of Engineering fc
Technical Programs 82/0?/29 4pp 15730 154 24X
Fi Che 50-2i6, 03/10/04, 0210170669
IE Info Notice 00-33. Suppl 1, "Leaking !< Dislodged 1-128
Inplant Seod " Bvc li*t end
COBfl.t ] D t vision of Fuel Facilities, Materials bOafeguards
63/10/06 Consolidated Edison Co of NOLI York 66pp 15761 35O
2-I< Fichc 50-000,62/10/06, B200190233
0203190230 IE Bulletin B2-03, "Stress Corrosion Cracking In Thick-
*Ja] !. Large-Diameter, Stainlesi Steel, Rec ircu latlon Bys
Piping at a\tR Plants " Bvc list enc 1
DEVOUNO.R C Director's Office. Office of Inspection *nd
Enfarcement B2/10/H Consolidated Edison Co, of Neui York
15S1O 133 24X Fiche 50-000.03/10/14,8308190230
R Penoific operating reports & related correspondence
B21O15Q15O Foi-uiaros monthly operating rept* for Sept 1903
FrtY.C IJ Wisconsin Electric Power Co 02/10/11 Office of
Nuclear Re-ac tor Regulation. Director lp 15697074 S4X
Fiche- 5O-2-66. B2/IO/1 1 , S21013015O
8310)50158 Monthly operating rept* for Spt 19B2
FAY. C W Wisconsin Electric Pouer Co 82/10/04 8pp 13697 075
24X Fiche 30-266, B3/10/1 1. S2101501 50
5 Reportablo occurrenies. LERs (< related corre*pondence
a2lOlEO3BO Advises that operator action necessary to protect B&U plants
from etce-ssive feeduater transients BtW plants do not employ
niS/i ste-am generator level turbine or reactor trips to
protect against transients
CREENELL. J S Director's Office. BO/09/12 MICHELBON, C,
Director'-s Office 34pp 15689286 24X Fiche 50-327,50/09/12,
831OI2O390
B310240370 Ack receipt of BSOBSB Itr informing HRC of i-tepi taken to
correct violations noted in IE Safeguards Insp Rept
5O-302/B2-17 Enc 1 containing BaPegudrdi Info withheld <ref
1OCFR73 SI)
LEWIS, R C Di viiion of Project & Rttidint Programs 92/09/17
HANCOCHrJ A Florida Power Corf 3pp. I5SO4 HSS H4X
Fiche 50-302,02/09/17,8210260370
B210260377 Forward* rasaonse to NRC B2O736 Itr re violations noted in
IE Safe-guards Imp Rept 50-302/02-1 7. Deta i 1 uilthheld (raf
10CFR73 21 d IOCFR2 790)
DAVWARD.P V, Florida Pouar Corp 92/09/33 O'REILLY, J F> Ktalan
2, Office of Director lp, 159O4 257 24 X Fiche 30-302.83/09/174
821O2&0370
3310010379 Ack receipt of B2O907 Itr informing NttC of ttejm taken to
cornet emirs incy planning tef icienciei noted in IE Inij>
Rept 50-303/62-06
LEWIS, R C Division of Project - Resident Proorami B2/09/20.
HANCOCK. J A Florida Power Corp lp- 19973-053 24X
Flche 30-302, 02/09/2Oi 821 C-010379,
B21O010044 Ack receipt of B 20701 Itr Informing NRC of ctp taken to
correct emergency prepare ilnest deficiency noted In IE
Emergency Pre paretfness Appraisal Repb SO-302/B1 ~14
LEWIS, R C Division of Project & flvidnt Programs 82/09/23.
HANCOCK, J A. Florida Poutr Corp lp t35A3-32O EJX
Fiehe SO-30S, 02/09/33,6310010044
8210010049 Respond* to NRC 810911 Itr re emergon-cy prp*redni
deficivncg noted In IE fmergencif Preparvdnnai Apprajj*!
Rept SO-3O2/81-14, Corrective act ioni naiii moteorologic*!
tauer to be built ueit of plant.
MARDIB, D 0. Florida Power Corp. 02/09/O1 d'HEILLY, J.P Rs-Qion
2, Office of Director lp 19569 321. Z4X Fiche. 30-302, 02/09/22,
&2 1 00 10044
8210260-0-03 Releases public ver*lon of revised radiological emergency
response plan
FELTOW, J.M Division of Aulei and Record*. B2/10/09. Dacutnant
Hanagomant Qranc^. lp. 19811,001. E4XFIch* 9O-30Si B2/10/O5,
02 10240008,
B210BA0010 Foruiarni public version of RevliLon 1 to radiological
emergency nspania plani In retponio to NRC 82O40B Itr
BAVMARD.P Y. Florida Pr.uep Carp, 82/OV/2B. O'REILLY, J. P. Region
2, Office of Dlr-ctoT tp ISBI1 002, 24X FJchi SO-3O3, 08/10/03,
B21Q2&OOOS
B3lQQtO3S5 Fpfwarils updated LER B2-OOS/01T-0
FAY-C H Hiconin Electric Power Co B2/09/2B, KEPPLER. J 0.
Hug ion 3, Office of Director lp 15616 022 24X
Ficll* SQ-3Q1, S3/09 /3B,S21004032S
-8310260013 Public verilon of Revision 1 to r<J tologic*! nergincy.
nsaani* plan.
* florid* Power Corp. 83/03/27, SSBpp. 13S11 003 S4X
Flche: 80-302, 82^10/05,6210260006
112
DOCKETED ITEMS
3210260309 Ack receipt of G21OI5 Itr informing MRC at steps tat rn to
correct violation* noted in IE Safeguard's Insp Rept
50-303/02-17
LEUJS.R C Division of Project 1 Reiident Program* B2/10/J2
HANCOCK, J A Florida Ptwr Corp lp 138O2 361 34 X
Fieh SO-30B.es/10/K3, 821026Q309
9210260436 Forwards revmon to B20219 subroittal r caltuUII
mea i ur emeriti of bui voliaget used to demonitrat* adequate
of ilectrieal diitributton sys '
BAYNARD-P Y Florida Pour Corp Q2/10/19 STOLZ. J F n
Reactors Branch A 43pp 13B06 246 24X Piche SO-3'
B2 102 60 43 A
B21036Q31Q Reipon,d tn riftC 020917 Itr re violation* noted in IE
Safeguard* Imp dap* 50-302/82-17 Corrective actions
uithhs-ld <nf lOCFflE 790 t 10CFR73 31)
BAVNABD^P V Florida Power Corp 82/10/13 O'HEILLY.J P fltaion
Z, Office of Diraitor Ip 19902 362 24X Fiche 50-302,82/10/52.
U21O36O30 1 ?
6210260423 flnoiti concurrence u/interim pUn to maintain linn LIU
for ehitnfttru control in once-through (team genaraUhi In
high energy lint itite during each startup until Unfurl V
Condition reportid in LER 32-098 Amend tee ulll be itrit
BAYMAHD.P V Florida Power Corp 82/10/22 BTOL7.J F Oernbix
RiactQTi Branch 4 2pp ISflOA 313 34X FUhe 50-303,
6210360422 vs.
P Operating lic*na itaje docunfnti & torrsspondttic e
82101BOO10 Faruar-dt raq.u*t -for tddl info r-o UnrnolvtiJ Safity t&nj
B-34 rs aptrabilitij of pur^i v*lvpi
STQLI.J F Operating Button Branch 4 52/07/20 HANCOCK. J A
Florid* POUBP Corp 7pp 1S717 353 24K Fiche 30-302,02/09/20,
B21020'i54 Upoatu itatui of ate-enfl task force *(Uon pUn Tin
force "ctivltiei tiplctBd to be concludiif by 62123] Finj)
refit ! rpcopnm*ndd Implementation plant will bt lobmlll.j i>..
930121 " "*
&AVHARD.P Y Florida Power Corp 82/10/22 BTOUI. J F 0>ifjt -
R.aetort Dranch 4 3pp 1SB07 120 S4X Fithe 30-30?,
821Q2AQ4S4
92101 BOO35 Adviiei that plant emergency ftiduater automatic Initiation
!< flou Indication l/s ccmpltj u/NRC 1 ong-trm af Btij-jrade
requlr emeriti u/ iceptiofi re control room indication of
ov*rr id Ing automatic Initiation capablllt^
STOLZ.J F OjBrating Reactor* Branch 4 02/09/27 HANCOCK., J A
Florltf* Fotutr Corp 7pp 1374i S60 S4K F(ch 50-302. B2/ 09X87,
B2 101 BO 035
B210SfiO*97 Submiti response! to End l.Quvitioni 1 i, a in. MHC 3". i/i
Itr re Oetiiric Item 0-24i "Oprability of Purge Vlvi " *"
H/flvi overiite drauilng* Apirtur* cardi are vat|at>l In
PDR
BAYWARD, P Y Florida Pouer Corp 82/10/22 370LI. J F
Realtor. Drench 4 3pp 15809 B44 24X Flche SO-HOS.
"
Osirtt
esoa 190290 "AuHliarg FeedyntiT Stfs Automatic Initiation t Ft ou
Intfltat ion, Crigtal River Unit 3, " tvchmcal eviluation r>j>t
KAUOHEFI'-J E Franklin IcntituU/Frjntl in ftaieirch Center
(jHC-oa-79-i ia TER-cgsa7-28a aa/oe/17 KEH&ALL,R MHC - H
B. tailed Affiliation OJvn Ibpp. l&74b 267, 24X
Flche- 50-30Z. S2/&9/27, B2I01B0033
B2IOOfi017e Submiti update to 601106 reipaniei T interim ra
evaluation prosram itudg rttommendatj on* Mo further eatunenie
offered
SAYNAHD.P Y Florida Power Carp -B2/-09/29 STOUZ. J F Operatinj
ntaetors Branch 4 9pp. lSi.14 01O 34X Fleht 3 0-3O2i 62/09/37.
8210060190
921. 00602 fc3 Submit* primary tut reiulti re ijiftrly goal for
containment purffitig t (me. per TMI Action Item II E A S>
baitd on data collected during 30-d*v tett period uhich
began on 320723
DWNARD.P V Florida Power Corp, 02/09/29 BTOLZ.JF, Ojiiratinjl
Reaetor Branch 4
EJ310QAQ263
2pp
[S6E1 063
Flche 50-302, B2/0?/a?,
8310150316 Elaqueitt aicmptLon from 10CFD3-0 44(c]G) lill) requiring
rcdctar va*f 1 hia-3 -high point vent Altirnativ* Aiithod*
for want performance provided in ufcil B10130 >u*m( ttal, in
T(.one to HUflEO-0737, Item [I B.I
BAVMAHB.P Y Florida Power Corft B2/10/1S. flTPLZ, J F Operating
Reictori Branch A 3pp 15705'3B3 24X Fich* 50-302,62/10/12,
Q Imptc tlon reporti, IE Bulletin! & correspondence
B3100B001S Addl nsporne to FQIA request for 19 Cataaorlti of Hf* -i
nuclear reactor events lc aafitg problem* Forward! dQcuflir.tt
Jlitfl in App A Document! in App B camp let* lu ufthhild trtt
Ft) I A Emnptlon 9)
FELTQN f J M Diviiion of Rules and Record) 92/07/13 UEflL I l
Critical Maif Energy Project 9pp 1S665 OH7 B4X
Fiche SO-GOOi 62/07/12, B2IOOB0015
B2100B0125 Suttemitic ai B iment uf llcensne perfornjirii nolei n
facility iwalmtion for Mai; t97*-Apr 1930
* NRC - No Ditallad Affiliation Given BO/04/3O 7 5 B
13667 327 24X Ftche 30-000, B2/07/12, B3100B0013
B210270239 Foruardi IE Saf.guardi Intp Rept 30-303/02-17 on OJOIrt 7
* notice of violation Notice of violation fc rept dftaLli
ulthheH Cref 10CFR73 21)
LEWIS.!! C Division of Project (. Resident Program* NlCJ'll
HAtJCOCK, J A Florida Power Corp 2pp 158H3 007 SI I
Fiehe 50-302, B2/07/SA. 8210270229
BS10270239 IE Bafegu^rds Insp dipt SO~303/BS-I7 on O^OJOh 07
Noncompl iance noted failure to Initiate adequate
eompeneafcor.) meatures Detail* withheld <rf lOCFn/.l 3IF
PERHV.C., MCOUIRE.D R Division of Engineerlnj fc fithnUH
Programt 88/07/83 Ip 13B33 007 24X Fieh 30 JM.eJU'.i
8210270229
6^10190691 Provide* addl Info re oe calcjlationi for NURE8-0737, Item
It B a, " Oaatgn Of Plant SMelding k Environ Qualif icit ion
af Equipment fc-r Spacet/Biji Which M*u Be Uie-j in Pot-
Accidgnt Operations "
Y Flopids Powr Corp B2/1Q/12 BTOLZiJ F OparatinB
'ranch 4, Sop 15736 201 24x Fitha, 30-30&, 92/10/18,
B210340370 Ac k r*cei|>t of BHOflas Hr informing NfiC 0* itii l.hi.
correct violations noted In IE Safeguard* Imp Dipt
30-303/82-17 End eontaininj iafgttar*Ji info ulthhald Irtt
10CFJ173 81)
LEHI3,R C. Division of Project t Resident Proorami 07/09/1)
HAHCOCKrJ A Florirfa Pouor Corp 2pp 13Q04 33D S4j
Ftth* 00-302, BS/09/I 7,6210260370.
^erm uork schedule re NUREO-ObSO,
"lodels for LCKA AnflIi;- It. " not
14 to tncanplfte thort-tern
'd u/MRC tprvl of rept
ifp B2/10/14 LAINA8, 8 C, A.. It taut
, lp. 13739' 143 2
8810260377 Forwards response to NRC 820726 Itr- re violiUa"! s,i
IE Safeguard! Imp Rept 30-302/82-17 Detail* wltMitlf trtt
10CFR73 SI ti 10CFR2 7fQ)
8AVNARD', P Y, Florida Pouitr Corp B2/OB/33 D'ftE]U,V. J f r^
2, 0*fic of Director ip 13B04 H37 24K FUhi JO-3M.K1'
82103^0370
visan licensed at senior
b WflEO-0737,
EIBEMHUT, D C Division
">S, B2/10/1S,
8210010379 A.ck ricelp* of 820907 Itr inFormlnj NRC of iliii 1U<i n
correct amergencv planning deficiencies noted in IE Enti
Rept 90-30S/B3-08
LEWIB,fi C Division of Project lc Resident Prooram df/Ct'l!
HANCOCK, J, A Florida Pouier Corp Ip. 1SB73 DBS, 3
Flehe 30-302. 08/09/80,8210010379.
8210010044 Ack ncelpt of B20901 Itr informinj NRC of ilfll Uln
correct m*rg*ncv preparedness deficiency notej in IE
Emaratncy Preparedness Appri*l Rapt SO-302/81-U
LEWIS.R.C. Division of Project fc Resident Progr*i
HAHCQCKiJ.A. Florida Power Corp Ip 13363;3-aO 241
Flchi 90-302i 82/07/S2, B310010044
DOCKETED ITEMS
113
Responds to NRC 010?11 1 tr re emergency preparedntss
deficiency noted in IE Emergency Preparedness Appraisal
Rep-t 30-3Q2/B1-14 Corrective actioni ntui meteorological
>touer to be built west of plant
MARDES.J) Florida Pouar Corp BS/09/01 O'REILLY.J P RegUm
2. Dfflcn df Director Ip 15565 321 24* Fiche 30-302. 92/09/22,
9210010014
Discusses potential problem re Squoyah realtor pressure
noaile, su-pp lementing 800222 memo Underelad cracfc* found by
uit of ultrasonic equipment Add 1 items of recant origin
discussed Related info- enc 1
DENTON, H fl Office of Nuclear Reactor Re-su !**><">" Diractc-r
flO/oa/Sa AHEARNE.J , QILIHSKY.V . KENNEDY, P Commi ssianer*
<?pp 15727 170 24X Fiche 50-CKK), ft2/OA/2a, B3100(QOGB
aSOSl10233 IE Info Notice QO-35, Suppl 1, "Leaking tc Dislodged 1-125
Implant Etetfs " Svc lut encl
COaa,L I Division of Fuel Facilities, Material! b Safeguards.
BS/lO/Oi Consolidated Edison Co of Nuu Yor* ifipp 157fil 250
3*f Ficb* 5Q-OOQ,H2/lu/06,820Bl 1 ?0233
6208190236 IE Bulletin 03-03, "Struii Corrosion Cracking in Thick-
Hal 1 , Large-Diameter, Stainless Steel, Rec ircu lation Sijs
Piping at BWfi Plant; " Svc list encl
OtVQUNQ.R C Director's Office, Office of Inspection and
Enforcement BS/10/14 Consolidated Edison Co of Neui York
115p.p 15310 123 '34X Fiche 50-000, B2/1Q/ 14, 820BI9033B
V receipt of 821015 Itl- informing NRC at steps taken to
correct violations noted in IE Safeguard! Insp Rapt
5Q-302/B2-17
LEWIS. R C Division of Project t Resident Programs B2/IO/22.
HANCDCK-J A Florida Power Corp Ip I SBO2 361 24X
Fiche 30-302. HS/1O/23, B21QS60309
Reiponds to NRC 320917 Itr re violations noted in IE
Safeguard* Insp Rapt 50-302/82-17 Corrective actions
JiCKnald (ret 10CFR2 790 & 10CFR73 21)
GAVMAFtD.P V Florida Power Corp 62/10/15 O'REILLViJ P Rofl'an
S. Qffift of Director Ip 1 5B02 31,3 24X Fiche 50-303-02/10/23,
B2 1 0360309
S Rpportabli
UER* Si related correspondancg
DISCUISHI docaij heat closed cycle cooling uiater pump motor
being out of tpec Caused bv inadequate lubrication Problnm
highlight? vu 1 neralu 1 1 ty of nuclear power plants to
i n ad -equate lubTlcation Sped & uiarl order encl
ORWSTE1N.H U Director's Office BO/03/20 MICHELSON.C
Diret(c,r'-3 Office 4pp 15649 337 24X Fiche 30-302,80/03/20,
8001020420
631Q12O3BO Adv'iies that operator action nectrssary to protect UIiH plants
from BiCBtsivv feailijater transients DtiH plants do not employ
Mgh steam generator level turbine or reactor trips ta
.protect againit transients
CAESUELL.J 3 Director's Office BO/09/13 MICHELSdN, C
Director'! Office 34pp 1S6S9 23(, 24 X Fiche 50-302,60/09/12,
8210-120300
Q&1O23O435 Foruards jummari) of B00930 transient, all igator cllf event
While at 19^ poiuer, instruilient test 1 eadi fell causing
fetduatBr runbact d control rod insertion
DRNSTEIN. H t Dinctor'i Office SO/10/08 HICHELBON.C
Oirvctor'ig Office 3pp 15693 265 34X Fiche 30-302, 00/IO/Ofl,
BOIQ33Q433
3013290! IB Dlacutses conclusions of engineering evaluation of ttcam
gene<ratar overfill transients *t C-E ti West inghoue plants
1-AtJMJtje, g D Director's Office BO/10/29 MICHELSON, C Director's
Bttitt 3pp 1S693 263 24X Fiche 50-000,00/10/29,8012390110
J31OO1O008 Responds to FDIA request for 19 catigories of documents re
nuclear reactor events t safety problemi Forwards document*
] i t t*J in App A
PEL TOW, O M Division of fiul.i and Records 82/06/BB UDEtL. R- A
Critical Mass Energy Project 15pp 157S7 005 24X
Flctit &O-000, 62/06/20,8210010000
-~BlOibl5O5S5 Informs that ESFAS relay failure revieued to dit'rmlne
significant number of fai lurei, safety consequences &
nu-at if ica Stors of E8FAS ralayi Failure considered simple
isolated gvtnt fc does not uarrant further action
LAINAS.O C Assistant Director for Safety Asieisment SI /OS/OS.
EISEMHUT, t) Division of Llcenilng 2pp 1S730 137 2<4X
Fiche 50-000,92/06/28,8210010006
aiO9QB&417 Cod-eludes that no addl actions are required re en8in*red
safeguard* relay failure* Various relayi, Including nau
Cr^don relays, should be monitored as watch list item*
Failures *fter Sept 19B1 outage should be reviewed 1
CH1RAMAL,M Director'! Office Bl/OB/ZB MICHELBON.C
Director'* Office 2pp 1S730 12B 24X Fiche 80-000, 02 /OA/ S3,
9310130310 Forward! tER 8a-045/03L-0
HANCOCK, J A Florida Pouer Corp 62/10/O1 O'REILLY, J P *"
B, Office Of Dir.ctor Ip 1367B 333 S4X Fich* 50-302, 62/10-/OI.
B21013O310
BB10130319 LER B2-O45/03L-O on B2070i, emeTfl nncj foeduoter ultra&onlc
flou' irdicator FW-313-FI ditcovered innpsrablo & train
arbitrarily declared innnsrable Caused bij fntlod power
sucply-Pouer supply raplacul t indicator repaired
FORP.EW Florida Po-uar Corp 83/10/01 Region 2, Office of
Dir*ctor 2p p 19670 339 24X Fiche 50-302, 62/10/01. B210 13031O
8210130320 Forwards LER 82-057/03L-0
HANCOCK, J A Florida Payer Corp US/lO/Ol O'REILLY. J P P?9on
2, Office af Director Ip 1S69S 352 24X Fiche 50-302,92/10/01,
B21OI30920
__ B210130930 LER 82-O57/0-3L-0 on B203B7. con ba inment isolation valvo in
ivc uioter ays (BWV-t 1 ?) not strofce tin* teitad follouino
maint Canned by parsonne.1 failure to include etrokB time
testlno in uark request Maint planners instructed
FORD.E H Florirfa Power Corp. BB/10/Q1 Rejton 2. OFFIcs at
Director 2pp E56BS 353 3 Fiche 30-302,62/10/01.6210130320
S21O190A77 FariiiardB LER 92-05B/OIT-0
LUTKEHAUS.TC Florid* Power Cc-rp B2/10/03 O'REILLV, J P Regian
2, Office al Director tp 13730 162 24 X Fiche 30-303,92/10/00,
e210l'70iiB7 LER B2-09B/O1T-O on 620924. value lineups Hantiflei) which
allo-u onco through steam jenerator drain lines to oe usd
for blnudoun operation* it alo sllowt high energy fluid
through line* Cauaeif bu inadequate review of sys dstign
UILSDN.K R Florida Pou&p Corp Q2/1O/OS fleoion 2, Offico of
Director Spp 1573B 143 24X Fiche 30-302,92/10/06,9210190677
92101*70271 PNO-IE-B2-113 on B21014,rle In, airborn* radioac tivi tij
level* In reactor bldg detected Caused bu leak in vicinity
of reactor coolant drain tank Unit shut doum & will b out
o-f vc tar about 3 w*i to invBttijata t> repair laaV
RQOOE,J F , BRDWNLEE.V L Rogion 2, Office of Director 82/10/13,
2p 15737311 24X fiche 50-3O2, BB/ 10/13. 9210190271
B31Q820052 Forwards LEU B2-039/03L-0.
HANCQCK.J A Florida PDUmr Corp B2/1O/13 O'REILLY.J P floginn
2, Office of Director Ip 1S77B2O7 aiK Fitlio- 30-30-3, B2/ 10/ 1 3,
9210220092
921O22Q03fc LER B2-059/O3L-Q on B20915. valve DHV-tll an decay haatline
D ttlltt to control Flaa Caused by inoperable flnu switch
Buifich replaced S. eUir 6 DHV-1U functionally tested
u/satiifactoru rasults.
HUftHeS.P.O Florida Pnuer Corp 92/10/15 FUgian 2, OfUct of
Director Spp 1577FJ: SOB 24X Fi ch- SO-302, B2/10/1 S, 0210220033
0S10290186 RQ 92-O5Bvhigh anergij lines exist in reactor bldg Study
on rtf training line* fur pipe uhip comp leted. Al tornafclvs
under review ftaquests approval to maintain lines tmbll
BAYNMSDiP Y Florida Pouer Corp B2/lO/a HTOLI, J. F Opsvatlng
Reactors Sranth 4 2pp ISB53 309 24X Flch* 30-302, SB/ 1O/ 22,
S21O29O166
B21O2903ia Informs thJt special rept sup.po*edlv ancl In 021001
submitted LER B2-049 dvtfrrnined to be mom uteFul as battl*
of Tech Spc change reniuvst ta b* lubmlttsd *t lflt*r <lat.
BAYNARO.P V Florida Fouier Corp. B3/iO/25, D J RILLY, J P- ReBlon
2, Office of Director tp 13B53, 1S8 24X Fiche 30-302,62/10/23.
B21029O312
DOCKET SO-304 ZION NUCLEAR POWER STATION, UNIT 8
F Security. meilUalr amerganty li fir* protection plans
B209290125 Relaaifs public version af revised ganerating itttLon
emerg'Tici) plan corporate command ctr emergency plan
implementing procedure.
FELTONj J M. Division of Rules and Rcord B2/09/1A Dneumsnt
Mananenant Branch lp- 13Si4, 122 24X Flehe: 5O-OOO. B2/09/14,
114
DOCKETED ITEMS
8209290199 Forward* public verilon of Revii ion 4 to generating Italian
emergency plan corporate ccfunand ctr Etoergencij Plan
Implementing Procedure EGF-3. "Environ/Emergency
Coordinator " Receipt form tncl
PAJOHSHI.J E CcmirLanwaalth EJHon Co 82/09/01 DENTOW, H R NBC
- Ha Detail d Affiliation Oivin lp 13344.123 S4X
Filh 50-000, 82/09/16, 8209290123
8209270229 Public venion of RrvHion 4 to p.tirating itation
mtrgenEV plan rorporate command etr Eflirgintg P>"
Implementing Proc*<fure EOF-a, "Environ/Ernei-jencY
Coordinator "
PAJOWSKI.J E Commonwealth Editcn C& 02/06/31 Upp
1356.4 124 24X Ficho SO-000. 82/09/ 16. 6309290123
B2100BOQ29 Rdleaie-i public vsnion of rtvition to emergency plan
imp 1 mien t ing procedure
FELTON.J M DlvUIon of Ruin and Birordi B2/09/22 Document
Management Branch ip 1 5oA9 307 24XKiehi 50-893. 6 2 fOt/ S S.
83 1 0080027
6210QB003Q Foruirdi public veriion of Reviiion 3 to Emtrjeney Plan
Implementlnc Procedure EPIP 530-3. "Radiological 8upp|iei
for Medical Emergenei*! " Receipt form end
PLIML.O Commonwealth Edtlon Co 62/09/07 DENTOM, M R NBC - No
Detailed Affiliation Olven lp 15449-303 24*
Flche- 30-295. B2/09/22. 8210060089
S2100B0031 Public version of Rvlilon 3 to Emergency Alan I nip lamenting
ProteJur* EPIP 390-3, "Radial og leal Supplit* for Htdical
Emirg inc iB " Proee^uro changi r(q.unt farm ancl.
* CoiMiontiitjitf. Edlion Co S*/0?/03 Bpp 1S649 309 24X
Fleht 30-295,82/09/22.8210080029
ForuiarJi rvled inmotion. rtqusitt from provlilans of
lOCFRSO.App B.Bictlon HI. Sri p&ft-firt ihutdouin
capability, ptr 6209(7 tslcon
LENTIMC.FO Commonwealth Edii on Co B2/10/01 DEMTOH, H R Officr,
of Nuclvar Riactor fijultion, Dlrtctor. 30pp. 15tll 066 SIX.
FEchl 50-293, 98/10/01,3310050207,
8210l3037i Advil!* that InmtalUtton of offilti dot* calculation njo
program fully oparatlonal t Tiding modal t oparattonal
A-mo-fil ulll be daliijid until B21231 to conpliti (>rim
computtr In-itallJticn
BUART7,E D Camraoritfulth Edtion Ca BSflO/Ol, DENTON, H R Office
of Hue Liar Rt actor Rtgulatlon, Dinct-OT 2pp 15iB2 098 StX
FicFit SO-OOO. fl2/10/06tS2H3130376
Q210290047 Ptltaiit public vtriion at rtviiiont to Qii*d Citi-ii. lion d
Drafdrn cnxrgancq plan anniio 1 rtvinif jsntratina
tation inifrganev plan taltphani dlractori/.
FEtTOM, J II Divlilon of Rulti and Ritords B2/10/08 Documant
Maiugamcnt Branch lp. 1SB77 313 24X Flchi- 90-000, QS/10/09,
B2 10290047.
BS103900iO Forward! public vtrilon of Rtwlilon 3 to Quad Cltlte S> lion
i<n*rgani:v plan *nninii Rivliian 2 to Drnidin narginci| pUn
annaiiRtvt* Ion to Byron vntrgincv plan mini t> rtyind
gtntratlng ttition <an*r gtncv plan tiliphont idiractory
HQQRE.R D. Commonuaal t h Edlion Co. SS/07/30, DEHTDN. H R NRC -
Mo Dttallad Affiliation Otvin 5pj, 15877 G14 34 K
Fichi 90-000, aa/10/08, B2I0290047
6210390077 Public vanlon a* Rtviiion 3 to Quad CittM Zlon
nrg*ticy plan annnaii Raviiicn 2 to Draiii*n inirganty plan
annti ti Ravlilan to Bijron inargincy plan annvx
Gommanunlth Edlion Co 62/06/30 323pp 19877,317 24X
Fleha . 30-000, 82/10/08, 8810290047,
6210230419 R*liiiii public veriion of ravind imarnincv pi in
Inplimcnt ing proeidun
FEI.TON.J M Biviiion of Rulai and Record! 02/10/1? Dotiii
Hanagtmtnt Branch lp 15B60 001 24X Ficha BO-295, OS/ltl/l J
B2102E0419
6210280424 Forward! public vsnion of Fiaviiion 5 t
Impliine-ntino Procufure 11O-1. "Station Dirtctor
ch*ngi rq r uit 4 noipt form tnel
PLIHLiO Commonutal th Ediion Co Q2/07/17
Datilltd Affiliation Olvin 2pp 1 SBiO O02 24X
FlcAf 50-299,62/10/12,8210280419
II fl SPC
B210280427 Public vrsion of Hviilon 5 to Emtrsncif Plan
Procidur* 110-1, "Station Dinctor " Rtviiird irvtfai and
Caimnonkinalfi Edlion Ca 93/07/16 5p p 15360 004
Fleh* 50^295,62/10/13.6210280419
Q2102S0442 Riliait* public vsrtion of ravind niBrgneij plin
irnplifflf nt ihfl pructdurff
FELTCW.J M Dlvliion of Ruin and Rcord B3/IO/12 Dmctfi
Managimant DrBnch, lp 15839 001 24X Ficha 50-395, D3/10/IJ r
32102B0442.
9210280445 Faruardi public vinlon of Flivi* ion 4 to ErnT(in<i Pli
Implmnt Ing Procsdure EPIP 3SO"S, "Environ E~mrgn-CY
Kit b Emrg>ncv Oparationi Facility Radiological Cqutpntnl "
R*c*lpt form tncl
PLIMLiO Commanuaalth Ediion Co 82/09/ 1O. DENTGJMI Ft If:
DtUUad Affiliation Oivon lp 1 5059 002 34 X
Flchi 50-275,62/10/12,6210260442
82 10280 4 47 Public version of Rsviiion 4 to Em*roan[g Plan
Implementing Proctdur EPIP 330-2. "Environ emBrjanig K1( I
Emirgincij Operation* Facility Radiological Equipment *
Pro-odurt changi riqueit form tncl
* Commonunalth Edison Co B2/09/03 8pp 13059 003 HI
FUhe 50-295,82/10/12.6210280442
D2t022035Q Providt* Info re organiiation 1 pa vf ormant > of J-iptl
raiponlibli fur radiation protection ac tivi ti*, per 090-703
coraml tment Training coordinator anigned In Apr 19GB ^o
improve health phgiici training program,
TRANM.T.R Commonuialth Ediian Co Q2/10/14 DEHTOW. HP Otti '
at Kuclaar Reactor Regulation, Dlracbor ?pp 1 37 74 IC7 241
Fich* BO-000, 82/10/14 r 0310220338
8210260405 Notification of 821026-29 nuetinot u/utll tc DNL In BHHi,i,
MD to d lieu ii d reiolw* o.ueition* on propoeed mraption la
fipp H
WJOOINTONiD DperaUng Reactor* Branch 1 3/10/22 WMA.S *
Opirating Reactor* Branch I 2pp 15859 327 S4X
Flch* S0-a?9, 82/10/22,9210260409
H Oineral carre*pond*nct
8210210239 Commanti on facility operation NRC ihould d*n|| utU
permit* 'on to ute high turnup nuclaar fuel Evidence
luppoi-tlnp continued opiration of facllltg *houl4 b*
provided to public
QUIOOiC Pollution tc Environmental Problem*, Inc DSMOJIS
Director'* Offic. OFfici of Inipiction and Enforcintnt }f|
137&&.2S? S4X Fichl 30-295,62/10/11.9210210239
D Advliorg Conmitti* on Reactor Safeguardi report* &
8210270408 Commenti on probab i 1 litit riik *ittnm-tnt pr II II J! I
inatl.0tn.tral mithod* b principle* emplatjed in analuili at
poiiible earthquake ihaklng b lit* appear to apply mudirn
itat* of art technique!,
TREFUNAC.M D Sou thorn California, Univ of TRIFUNACiJID
Aifvliorij Committee on Reactor Bafiguardi 92/O2/23
ACRB - Advii-org Commlttie on Riactor Safeguardi
24X Fich*' 90-293,82/02/23,8210270406.
t. aparating Itcente itag* document* b correspondence?
60071 S0303 Notlfin that revieu ulll be conducted of Dlfllsn I** 1 '
(hort-t*rm rtk itudiai uilng variou* rnourca*, In ruptnn
to eOOiOS req.uet Evaluation uill be tubmitttd bi| 0009JJ
MATTSOM.fi J, Dtvlilon at Safety Technolagv 30/07/03
EIBENHUT, D. Divldan of Licenilng. 2pp. 02992'aOl. W
Flehe- 30-847, 80/07/02,8007190303,
8210070007 Reipond* to FOIA requeit for eight cjtijarlli *f
ittan jenTfcor t> (team turbine* App A document! provlll
in R Udell FDIA Requait 81-313 Forward* document! llltH
App B.
FEtTON, J H Dlyliion of Rulei and Racordi B2/OG/IO
Wlnthrop. Stioiion, Putnam fc Robert! 9pp. 19MS:Oo<3
FIe*e: 30-000, 82/08/10,8210070007
DOCKETED ITEMS
116
-6203110403 Forwards response to OD Dume le, C hairman of Pollution Control
Board, State of IL. questions In 820127 Itr
JCHflSTQNpH V Assistant Director for Materials 1< Qualifications
Engineering B 2/02/22 LA IN AS. Assistant Director for Safety
Aiteiintnt 2pp 15643 12i 24X FichB 50-000. B2/OB/IO,
G2 1 00 70007
3^9160503 Suppls B20S31 Itr re 020903 meeting at Region 3 ofc
Recent operation of Unit 2 u/tuio inoperable auxiliary
* eed-uattr pumps added to agenda
HEPPLERpJ C Region 3. Office of Director 82/09/03 HEED, C
CiHr-aonuealth Edison Co Ip 14904 087 24 X FichB 50-295. B2/G9/Q3,
B2Q9I40503
31O04O218 Requeits rsaff irmation of technical basil for operation
at tOOK oower Sianificant financial penalties incurred due
to operation in overly conservative manner
SriEDE.U L Commanuealth Edison Co 82/09/27 DEVOUN8, R C
Ciroc tor 'i Office, Office of Inspection and Enforcement 3pp
15533 115 24X Ficha 50-395,83/09/27.8210040218
21OOBQI1I Forward* completion status fc revised schedule far
Improvement* made to control room dlsplag since 1980 rept,
p*r BO 03 3? conf irmatory order
LEfjriME.f O Commonwealth Editan Co 82/10/04 DENTQN, H R Office
of Nuclear Reactor Regulation. Director 4pp 13640 022, 24X
Fiche 30-299. 82/10/04, S2100B01 1 1
'IO13O1QS flequsts delay of impl ementfl tion due dates re MJHEC-0737,
It (ins II B 3, "Plant Shielding," II B 3, "Post-Accident
Sampling" t> I I F 1 ! "Noble Gal Effluent Monitor "
SWAFJTZ.E D Commoniuealth Edison Co 82/1O/04 EIBENHUTi D
Division of Licening 5pp 1S65I 237 24X Fiche 50-000,32/10/04,
B2IOE20105
'IO2&.O52& Forwards Revision 3 of Chapter 9 of "Offsite Dose
Calculation tUnual "
COLD EH. J C Commonwealth Edison Co SS/ 10/06 CASE. E O Office of
Nuclear Reactor Regulation, Director Bpp 19805 137 B4X
Ficho 50-COO. B2/10/06, B210260326
B2101905AB Forwards IE Enforcement Conference t, Insp Repts 50-295/B2-19
t, SO-304/B2-I7 on S2O717-090? S< notice of violation
EPES gftRD,fl L Division of Project * Resident Programs B2/O'9/3O
REED.C Commoniuealth Ediaon Co 2pp 1 5736 112 S4X
Fiche 90-295,82/09/30,8210190969
8210190579 Notice of violation from inp on B20717-OB31
* Division of Project & Resident Programs 02/09/30 tp.
19736 113 24X Fiche 30-295, S2/09/3O. B21 Ol 90SA9
8210190599 IE Enforcement Conference & InP R'pts 50-275/82-19 &
SO-304/B2-17 on B2.0717-OW? Noncomp 1 lance noted failure to
follow 8C-022 1 ? conf Inflatory ordar requiring expeditious
shutdown whenever au>iliary feeduater sys inoperable
MATEftS.J R , SCHNEIDER, , REYES. L Rleglon 3, Office ',_,.
Director 82/09/22 9pp 15736.114. S.4K Fl ch e. 50-295, 02/09/30,
82101 9096B
8210060399 Acli receipt of B20910 Itr informing MflC of steps taken to
correct violations noted in IE Insp Repts 30-237/B1-39,
50-849/01-32, 50-2S4/S1-23, 50-263/81-83, 50-295/81-31 &
SPESSARD.fi L Division of Project ft Resident Programs, B2/10/O1
REED.C Commonwealth Edison Co Ip 1S61B 354 24X
Fiehe. SO-00&, 82/10/01, 8210040359
821004.0367 Responds to NBC 820712 Itr re violation* noted in IE Insp
Repts 90-237/B1-39, 50-249/61-32.50-254/01-23! 30-2A5/01-23,
50-29S/81-31 I- 5O-304/B1-27 Corrective actions training for
mot priorities re plant availability will b* conducted
REED.C Commonuealth Edison Co 82/O9/10, KEPPLEH, J Roglon
3, Office of Director 13pp 19iIB 395 24X
Fiche 50-000, B2/10/01, B210Od0359
B21008017S Foruiards listing of piping DS yhleh fall to meet FBAR
requirements, per NRC 800918 confirmatory action Itr. IE
Bulletin 79-14 operabilitv evaluation updates will not b*
provided for Dresden (- fluad Cities Final update bij Dec 19B2,
RAU8CH,T, J, Commonuealth Edison Co. 82/1O/O1 KEPPLER.JO. Ragion
3, Office of Director ipp 15640:139. 24X Fiche 80-000, B2/ 10/01 ,
B2100B0178
Revision 3 of Chapter 9 of "Offsite Dose Calculation
Manual "
Commonwealth Edison Co 02/09/30 03pp 15B05 139 24X
Fithe 50-000,92/10/06.8210260526
10220399 Suppis 820414 response to FranHtn Research Ctr Si 1003 draft
technical evaluation rept re control of hnavu loads
<tHJREQ-Qt,l2>, per 820854 b 25 telconi
LENT1NE.F O Commonwealth Ediion Co 82/10/12 DENTQN, H R Office
of Huclear Reactor Regulation, Director 3pp 15777 329 24X
FAchff 50-275, S2/IO/I2,B2I02203v9
1OI70443 Forwards juJdl info re NUREG-0737, I tern II B 3, "Pott-
Accident Sampling Sija, " In response to NRC 820722 Itr
UtiL currently pursuing possibility of developing procedure
to ottintat* core damage via Hestinghouie owners group
BHART2 f E D Commonweal th Edison Co B2/1O/13 EIEENHUT>D
Division of Licensing ISpp 15741 187 24X Fiche 50-293,02/10/13,
B21Q19O443
1O37O344 NotiFication of B21115-16 meetings u/Util in Olen El lijnr IL
to- discuss bates for current in*ervice letting proposed
aiemp t ion. inc luding alternatives to required imps
WlC-OrNTON.D Operating Reactors Branch 1 BE/10/22 VAROA, B A
Qperdting Reactors Branch 1 Zpp 15851,354 24 X
Ficn 50-299, 82/10/22, 8310370344
Inspection reports, IE Bulletins tc correspondence
IOO7OOO7 Responds to FOIA r*quet for eight categories of records re
Itcain gencritori b >tem turbines, App A documents provided
to R Udell FQtA Request 81-313 Foruardi document! listed In
\fp B
"ELTON. J H Division of Rules and Records B2/OB/IO, LOW, D. J.
Vintfirop, Stlmson. Putnam ti Roberts. 9pp. 19645.063 24X
rick* 80-000, 52/08/10,8210070007
3B10O7O13? Foruiirds tabulated date on steam generator insp li maint at
facitCEles Data ihoutd be provided to licensees
IPPDLITO. T Operating Reactors Assessment Branch 82/04/01
VARQA.8 Operating R*ctor Branch 1 3pp 1S445 131. 24X
Ficft* 50-000,82/08/10,8210070007.
B20Blf0233 IE Info Notice BO-35, Buppl 1. "Leaking < Dislodged 1-135
Implant Seeds " Bvc list end
CDBB, L I. Division of Fuol Facilities. Materials b Baf3Urds
82/10/Oi Consolidat^J Edison Co, of NBU York fiApp 13761 E90,
24X Fitb 50-000, S2/10/06r B20B190233
S21O190613 Acl. receipt of S2Q91Q Itr informinfl NHC of steps ta* en to
correct violations noted In IE Insp Kept. SO-S9S/B2-14 !
90-304/B2-13 Inttrpr-tatl on of Tech Spec 1 O. D unec|ieable
SPESSARD.R L Division of Projct t Reiidnnt Programs 82/10/07
REED.C Commonyealth Edison Co. Ip 1&739 361 B4!C
Fiche 50-273, 82/10/07, BalOlTOiia
8210190624 Responds to NRC B20B13 Itr re violations noted in IE lnp
Rtptl HO-273/B2-14 fc 30-304/B2-13. Dispute s NRC
eUsslficetion of 820625 reactor trip, Trip Inadvertent
Interpretation of Tech Spec 1 D end,
STIEDE.W L Commonwealth Edison Co. BH/09/1O KEPpLEfW. O
Region 3, Office, of Director. 4pfl 1574O.O01. B4X
Fiche' 50-293,02/10/07.0210190613,
820B19023B IE Bultetin B2-03. "Btr-ess Corrosion Cracking In Thick-
Wall, Large-Diameter, Btainles Steel, Reelrculation S-ji
Piping t BWH Plant* " Bvc Hsfc end
DEYOUN0, R C, Dirsetor's Office, Office op Inspection and
Enforcement S2/1O/14 Consolidated Edlion Co, of New Vor Ic
115pp. 15S10 123 24X Fiche BO-OOO, S2/1O/ 14r B20QI9023B
B31O270344 Notification of B2-111B-I6 meetiTtg" W/utll in Olin El lyn. IL
to discuss bases for current intervice testing propoferf
exemption, InEludlno alternatives to required lns.pi.
W1Q01NTQN.D. Operattng Reactor* Branch 1. 02/1O/22, VAROA, B.A,
Oesretino Reactors Branch 1 2pp 1BB31-3S4 B4K
Fiche: 0-39S 82/10/22,8210270344
R Periodic operating reports t, related correspondence
B21O19O4O5 Forwards monthly operating repts for Sept 190S,
ORAESSR,K, U Commonwealth Edison Co, B2/10/Oi, Director's
Office, Office of Inspection and Enforcement Ip, IS7O4.003 34X
Fiche: 30-299, B3/iO/Oi, 82101S040S
JaiO07O172 Forwards info re steam generator integrity & insps at ell
operating P'HRs.per 790320 & 21 requests, Details of insps.
Including defect indication*' tube plugging criteria & tubes
plugged ui 1 1 not be provided eicept for Point Beach 1.
CDLLER,H ft Division of Reactor Licensing (NRR-1973 onlgf
7S/O3/24 HACCARV,R R Dlvitldn of Technical Review (NRfl-1975
onlu) Spp 13443 196 24 x Fich* 50-000, 83/08/10, SS10070007.
8210190411 Monthly operatltig repts for Sept ilB
AUSTIN, Commonwialth Edison Co 62/10/06.
24X Fiche. 30-298, 83/10/06,821 0150408.
llpp. 19704:004,
116
DOCKETED ITEMS
S ftepartablr occurrence*, LEHs & related corritpondtnc*
8210070423 Secomminifi IE I i sue Into notice to Inform licsnsr* of
possible indnu*t* surv* lllanc* far proper tuning o-f
output capacitance far certain Inverters Recommendation
caied on 910509 d 29 ml* output transformer shorts
HELTEHEB, C J Director's Office S1/12/1C JORDAN, L Oiviiion
of Resident & Rtalanal Reactor Inipcctlan 4pp. 15414 2S5 24X
Fi che- 50-295, 81 /1 2/10. B21 00 70422
DOCKET 30-305 KEWAUNEE NUCLEAR POHEfl PLANT
F Security, medical. emergency It fira protection
820917004! Forinardi draft vital area definition rept (or fmliU
Dlv of Safeguardi ulll rcviiui technical bail* -for rpt
during 980927-1001 lit* visit U/o end
VAROA.3 A Opratlno Reactor* Branch 1 SH/OS/OB OlEStERit if
Wiitoniin Public Service Corp Ip 14910 106 24*
Flthi 50-305, 92/09/OB, B20917Q061
8310010009 Respond* to FOIA request for 19 categories of docuirunt i re
nuclear reactor events 4 safety pro bl inn Forwards, docuninbt
llitcd in App A
FELTON. J M Division of Rules and Records. 92/06/26 UDELL. fl A
Critical Mm Energy Project 15pp S5727 (JOS 24X
rich! SO-OOO.B2'/Ofa/2B-e210010008
91 12210538 Forwards description -of events t resulting action r nigh
circulating current auociated u/lnvirtir output dut to
lact of circuit tuning IE circular or info notice ihauld bi
lliuid to addMii lituv
HELTEHES, C Dirsctor'i 0>ffici 81/12/10, JORDAN, E L
Dlnctor't Office 4pp 19731 361 24X Fichu. 50-000, 82/06/23,
B21001000B
Ac k cooptration in planning Div at Safegujrdi BJOtJ?-] ::
rgul*topy P fc tivtnin revinu Ttam will evaluate ovtrill
f f { t(wn* t -of ncurltg program to dctirmin* It (aftguiTli
ngulatiQnt Yield acoptable Uv*l of protiction
EI6ENHUT.D Dtviiion of Lic.niing 83/O9/20 Ote6LEH,CU
Wil co-Hi in Public Birvice Corp Spp 19672 O74 a^x
Ficnt 30-309, B2/09/EO, 8310120305
aS100B020t Forward i IE 5af*tg Evaluation Rcpt SO-309/02-IT Jur Lr | n
I9S3 Mo no-ncomp 1 ine no tod
H1N5. J A Divfiion at Emergtncij Pr*p*rtdni 11 Ic 0(irtlanil S It
BS/Of/SS (JIESLER.C H Wl.coniin Public Siirvic. Corp 2
ISA 40 090 24X Fiche 50-305, 02/09/22, BZ 100 BO 201
-8203090&&9 Rupanili to rtquect to evaluate Ql 121 1 trip of two init
auiiliary fnifuat*T punpi from lou iLtHon. Init-aMitlon of
time rl*v on itartino cirtnitrj at motor driven -tuiilfarv
fcadwatic pump-i will eltminjte probltm
IUKDR-D Dirtctor'i Pfflci 82/02/24 MICHBLSON-C DLrtctor'
Oitlcr 3ft 19730 339 S4X Fi che' 50-000, B2/O6A29, 92I0010QQ3
8210030204 IE Safetg Evaluation Kept 50-305/82-17 during Auj K-Ei
Nt nontompl i nt noted Major areas Inipec tad amer-gtntv
ptn dtd Nov 19B1
PAOL1ARO, J A i AKELSONr W L Division of Emergency Prrpl'flriMl
Optration*! Sjppqrt 82/09/20 32pp 13640 Q<33 S4I
Fichi BO-305, 92/09/22,0210090201
8210050075 Suinnarg of 910513 opir^tlng reactor nvent) hitting
LAINAB, C A*iitin.t Olric-tor for Bft(j An*iim*nt B1/05/1Q
EIEEUHUT. D AitUUnt Diractcnr for Lie inting It ft 1572? 160
24X Fichi, 50-304. 82/Ofc/aB, 8310010000
G210130300 Faruardi CUvinon 3 to sscuritij force training I
quftlEFication m*nu*l Revition withheld (ref 10CF02 7VDI
OIEBLER.C M Mliconiin Public Servic* Corp B2/0?/il9
Office of Muclear Reactor Regulition, Director 2pp 1S610
24X! Flch> 50-30S,BS/0?/29, 8210130300
9210040114, Foruirdi LER aa-02l/C3L-0
CRAEBSEH.K L Commonuial th Ediian Go B2/Q9/S4 KFPPLER, J
R.gjor 3, Off tea of Dtractor Ip 155BI 191 34*
Flcn* 50-304,92/09/24,9210040114
B210040IB1 LER 82-021/03L-0 on B80B27. dur in running t>f 2A turbin
drivrn aurfliarij fatdwattT pump, flow obiervtiJ on pirnp 2
dlicharg* htadir -Cauitd b"j Improper prectdure
imp Itmnntit I on Prt>cdur* uill br revln-1
JOHNSON, Cnramonunalth EJlion Co 82/0 9/24, Rtgton 3<
of Director Ip 15591 192 24 X Flth* SQ-304,
8210040116
B3/07/30 KEPfLER, J
Oi5 S4K
ruardi LER
CRriea3ER.K-L Cannonuaalth Ed i ion Co
Region 3, Office of Director \f>
Flcht 30-304, B2/09/30,Q210060aoa
BEHD040267 LER eB-032/OX-0'9n SS0903, conti inrrunt ipraij dlan 1-drivin
pump 2C filled to ttart during remo-ti ontrol ro-om itartup
for mcJi*nl cal mint Cauitd by iGlcly undtripeed i witch In
c lot id paiitlon due to impurltlii Sultcn *elf-cl>inr<]
SHI Mi K Commonwealth Edtion Co 82/OT/30 Fltglan 3, Office of
Director Ip 1S&3I Oi6 2*1! Flche SO- 304, 62/09/30, B2100oOZt3
aai01B0167 Forward i LEB B2-OS3/03L--0,
ORAES8ES.K L Conmonueanii Edion Co 82/10/07 KEPPLGR, J
Rejion 3, Office o? Director Ip 137(8 1B2 24 X
Fich* 50-301, 82/10/07, BB101SOI67
6210180179 LEfi sa-023/03L-l> &n 920907,88 it*am gentrator level channel
2L-549 dtd no-t tract Cauitd b v failure of transmitter
(Flchr/Portr 1^DS49BKBBABBB-^S). TrinimCtter rplaed
Invei t lgtlon ongoing
CANTHELL.p E Commonui 1 th Edlion Co BS/IO/07 Region 3,
Offle* of Dlractor Ip 15718 183 34X Fiefie: SO~304,B2/10/07,
3201B01i7
5210050103 Forwards IE Safeguard* Inp Ftept 30-303/02- If, or* flJIEJ
i notice of violation Notice of violation withheld
(ref 10CFH73 211
KILLER. J R Diviiion of Engineering t, Technical Ftcyrifi tJ
OTESLER.C W Witeonsin Public Service Corp Spp iSiOJ HJ
Fiche 50-303.82/09/30,6210050102
8210050110 IE Safeguards Insp Rapt 50-305/Ba-li on QSQO'a if
Haneomp lianca noted failure to certifg qua lit leal lent tt<
itcurltv force number*. Dt*i 1 1 uiithhild (reP IQCFR73 Ell
flELANOEfl-J. L . CREED. J R Region 3. Office of Dirtctor 6J
Ip. 156O3 297 24X Fichv 30-305, B3/09/30, D2100SOIOJ
B210I305S1 Provides info ro change! to facillti/ flr p.to^ltlU^
conmitmtnti flvlid mod schedule submitted in At tach-nint I
of utll 820S04 Itr should be considered ma* t current li
accurate schedule
OIEBLEfl,C M Wlsconiln Public Service Corp 83/10/00
Off lc* of Nuclear Reactor Regulation, Director 2p? ISfrTfl
24X Flcha 30-305, 92/10/06, S2101305S1
8S 1023042 3 Forward! one-time fiemption from 10CFH90 App f-rnu
energvicij prepartdnesi exercise be conducted annually
EIBENHUT, DO Diviiion of Licensing 8S/10/15 OlEBlEfl.l
Mlicontln Public Etrvice Corp 2pp ISBhO OH ?4(
Flefte' SO-30S, 02/10/1S, 0210280423
32103604,23 One-tlffli exemption from 10CFR30 App , riquU InM* 1 "
tnnrjentv prvparednest eierclse Neit tiercit* tchttwllf
for B31101
EJSENHUT, D O Division of Licensing 82/10/13 WIIIBMJ
Public Service Corp 3pp 19860 014, 24X Flcht >0-301i >'
8210290433
P Operating licenss stage documents & correipondnc
6310240219 Forward* LER aa-024/01T-0
SRAESSEfir tt, L Camnonueal th Erfison Co 02/10/17.
R.afon 3, Offlt. of DirttUf, Ip 15804:262, ZAt
Fiche. SO-304, 62/10/19,8210240219
8210010)7? Application to amsnd Licensi DPR-4C3j rtvltinj Tick S
raDTg*ntiaton of nuclear dept
OIESLER.C. H Hlsconiln Public Service Corp 82/09/27 ^K
Nuclear Reactor Rsgulatton, Director 2pp ISSfi? Sfl7 1't
Fiche. 50-303. B2/09/27, S210010I79.
~9Si026023 LER B2-024/01T-0 an 650926, u,h!U taking RGB io!ld. dilution
occurred via incorrect nUup luhen cpnt*lntnt Intigrltu wat
not intact w/ihutdoun rglr> Caused bu ptrsonnel trror
Opr*tor ralnttructeil
T'NIENI.H . CoiMierivaaltlv Ed I ion Co, 82/10/11'. Region 3,
**- 2+X Fich, 50-304,02/10/19,
-S21OOIOISA Proposed Tech Specs reflecting org anil* than t JJl'
torporat* nuclear engineering staf t , elarl * iflny trt^liHl *'
meeting! & line of authority for nuclear safety r*v(ii
ay if it committee It i homing functional r*ipon*lblll tltl
* Miiconiln PUBllc Strvlc* Corp, 82/09/S7 13pp li'
24X Ficht: 30-308, 92/09/27,6210010179
DOCKETED ITEMS
117
6310060312 Advise* that analyses of plant-specific safety & relief
diva Discharge piping per NUREO-O737. Hem II D 1 require
jror* tine than proposed In 82O712 Itr Item resolution uill
be identified fc implementation schedule provided b<j 831113
CIESLER, C U Wisconsin Public Service Corp 82/09/27
EISEMHUT.D Division of Licensing Ip 1S619 169 24X
Firh 50-303,02/09/27,8210060312
B21OI 30600 Informs that review of 810831 %, 0915 responses to Oeneric
Letter 81-01. "Qualifications for Insp. Exam & Testing tt
Audit Personnel," completed Commitments t eiceptions to
Fe/inon I to Reg Ouides 1 56 it 1 146 acceptable
VARQA.5 A Operating Reactors Branch 1 82/09/28 OIESLER, C U
HicoTi*in Public Service Corp 2pp 15692 345 24X
Ficho 50-3O5. B2'09/2B,821013060O
S3IIJ21O395 Forwards safety evaluation of Generic Issue B-24,
"Containment Purging During Normal PI ant Op eration "
t.TJREC-0737, Item II E 4 2 mill be completed by purge & vent
revieu Technical evaluation encl
VAROA, S A Operating Reactors Qranch 1 82/09/30 CIESLER, C U
HLiccnun Public Service Corp 9pp 15772 314 24X
Fiche 30-303,82/09/30,6210210395
62-1O2I04Q3 Safety evaluation of containment purging t" venting during
normal operation Request for addl info re QA program encl
* HRC - No Detailed Affiliation Given B2/09/3O 4pp
15772 323 24X Fiche 30-305. 62/09/30, S21 OS10395
8-310210410 Safety evaluation of facility override of containment
purge isolation Licensee should demonstrate that override
condition automatically removed upon clearing initial signal
or provide sgs level annunciation
* NRC - No Detailed Affiliation Given 83/09/30 2pp
15772 337 24X Fiche 50-305,02/09/30,0310210375
B01OO7O330 "Technical Evaluation of Electri cal , Instrumentation it
Control Design Aspects of Override of Containment Purge
Valve Isolation tt Other Engineered Safety Features for
Heuaunee Nuclear Pouer Plant "
HACKETT. D B EOt.0, Inc EQO-1 1S3-4160 80/09/30 NRC - No
Detailed Affiliation Given 23pp 15772 329 24X
Fichi 50-305,63/09/30,8210210395
Comments on t-IRC proposed generic requirements for steam
generators Opposes requtrementsi favor ing mg t control program
currently in effect Program should be at volition of utll
mg I t, notice requirements
QIESLER.C H Miscons in Pub 1 ic Service Corp 62/10/04
IPPQLITO, T A Operating Reactors Assessment Branch 4pp
156SB 070 24X Fiche 50-3O5. 03/10/04, B2I007010B
aaiOJ9O40? Forwards progress update an implementing NUREO-0737. Items
II B 3, II B 4, II F 1 3. IIF16&1IID34
arESLER.C W Wisconsin Public Service Corp 82/10/14
ISEN4)ur, D G Division of Licensing 4pp 15733 331 24X
Fi che- 50-309, 03/10/14, 6210190489
is-pection reports, IE Bulletins b correspondence
B21O070Q07 Responds tn FOIA request for eight categories of records re
steam generators Ic steam turbines App A documents provided
in R Udell FOIA Request H1-3I3 Forwards documents listed in
App B
FELTON, J H Division of Rules anS Records 82/OS/1Q LQN8, D J
Wlnthrop, Stlmsan, Putnam h Roberts 9pp 15645 063 24 X
Fiche 50-000,62/08/10,6210070007
B2100SO204 IE Btfaty Evaluation Rept 30-305/B2-17 ifuriliB AUB l^BH
No noncompl Ijnce noted Major Tea* impacted emergence/
plan dtd Nov 1981.
PAGLIARD.J A - AXELSON, U L Division o* Emrfl*ncu Prpardns fc
Operation*! Support 02/09/20 32 (>p 1 364O- OfS 24X
FlchB =0-305.83/09/32.8210030201
8310060328 Farutrifi util B20917 riflan*t to MHC B2O71S quaitloni r> IE
Bulltln BO-04. indvertentl() sent fco Region 3
OIESLER, C W Wisconsin Public BaTvite Corp BZ/Qt/21 VAROA, a A
Operating Ructor* Branch 1 Ip 13619:028 SIX
Flcha, 50-309, BZ/09/29, B21O06O3ZB
8210050102 Foruards IE Bafaguardm lnp Rept 5O~303/B2~t6 on B20BE3-37
t, notice of viol*tin Notice of violation withheld
Iref 10CFH?a 31)
MILLER, JR. Division of EngineBrino < Taehnical Program! B2/09/3O,
OIESLER.C.W Wisconsin Public Sirvlca Corp Bpp 1 S603 B9S 24X
Fich* BO-303, ea/O9/30, BBlOOOOloa.
6210050110 IE Bafi-ouardi Intp Rept 90-303/32-16 on 920833-27
Noncomplijnca noted failure to certify qual if Isatlons- for
security force members Details withheld <rf IOCFR73 21J
BELANOEH.J L. i CREED. J R fieolon 3i Office of Director 33/01/33
Ip 15603 297 S4X Flcha 30-305,82/09/30,0310030102
8210060174 Forujirds conf irmatorii mm a sure men ts program data addendum
sheet for IE Insp Rept 30-305/02 QB h c toting out Open Item
50-305/B2-OB-01-
PAPERIELLO. C J. Division of Em erg one g Preparedne-si & Op>ratlot>al
Support 8S/10/05 OIEBLEfi, C M. WJiconsin Public Service Carp
Ip IS640 157 24X Fiche 50-3O5, B3/ 10/OS, 8310080-174
621O080177 Addendum to IE Inp Rept 50-305/92-08 coniting of
confirmatory meacuretiKn ti program data iheeb re 6r-B9 {<
Sr-90 samples Sample* balcw coirpariion llmlti
* Region 3, Office of Director B2/10/O3 Ip. 19640 158 24 X
Fiche 50-305, 02/10/034 821003017*
8208190533 IE Info Notice BO-3S, Sup pi 1, "Latino *< Dltladfled I-1S3
Implant Seeds " Svc list encl
CODE, L I Division of Fual Facilities. Material! It Safeguards
B2/1O/O6 Consolidated Ediion CD of Nu Vorl 66pp. 157il 3BO
24X Fiche 50-000, 82/JO/06, 8303190233.
8210190532 Confirms i-chedule for 02101B enforcarnent conferenco at
Region 3 ofcs to tflscuis potential escalated enforcement
action! r> rtcent Identification of capped containment
preiiure tensing lines
KEPPLER.J Region 3. Office of OirDctor 92/1O/I3 MATHEWSi E. U
Wlit on* in Public Service Corp Ip 157S1 2S4 24X
Ficht so-309. ea/io/i3,siaioi9os3ia
82102BOB23 FDTUJjTdt 1 Insp FUpt SO-305/B2-13 on B2O701-OB31 & noblcoa
of violation b deviation
STREETER, J F Division of Project & Reildent Programs 83/10/13
OIE8LER.C U Mltconsin Public. Birvice Corp 2pp. ISQSt 279 24 X
Flcfce 30-303, 82/10/13,0310300223
--63102B022& Notice of violation from imp on Q20701-OB31
STREETER. J F Division of Project b Revldent Program*. B2/10/13
Ij. 19B39 961. 24X Fiche, 30-303,02/10/13, 8210230823
82102B0229 Notice of deviation from Intp on 320701-0631.
STREETERf J, F. Division of Project t Red*nt Program! B2/10/13
Ip 19B37 262 24X Fi eh * 30-303, 32/ 10/13, 8310360223.
0310070139 Forwards tabulated data on steam generator Insp t maint at
facilities Data should be provided to licensees
(PPOLITO, T Operating Reactors Assessment Branch 82/04/01
VAROA, S Operating Reactors Branch 1 5pp 15645,131 24X
Flche 50-000,82/08/10,8210070007
-- 82102B0232 IE Imp Rept 90-303/82-13 on 620701-0831 Moniompli anca
noted failure to maintain control of comb uitib 1 e matli ti to
isiue operatlam ma mo ac at B20B2O
NLSDM,R.L , REYES, L- A, Division af Project & Roildent Program*
62/10/Ofi 10pp. 15B37.283 24 X Flchi ' 80-305, 03/10/13, 821 OBBOB23
S21O070I72 Forwards info re steam generator integrity d ineps at all
operating PURs.per 7S03EO b 21 requests Details of imp*.
in-eluding defect indications, tune plugging criteria St tubes
plugged mil not be provided eicept for Point Deach 1
OOLLER.K R Division Df Reactor Licensing (NRR-1975 onlv>
75/03/24 HACCARY.RR Division of Technical Revieu (NRR-J97S
onlif) 5pp 15645 196 24X Fiche 30-000, 62/Ofl/lO, 8210O70O07
GSfOQBOSOL Foruards IE Safitu Evaluation Rept 50-305/82-17 during Aug
[?B2 No noncomp 1 lance noted
HIHO.J A Division of Emergency Preparednes* ti Opsrattonal Support
BS!/0?/22 eiE3LER,C W Misconsin Public Service Corp 2pp
15640 090. 24J< Ficha 50-303,82/09/22,8210080201
8208190238 IE Bulletin 82-03, "Btrvif. Corroiion Cracfcing in ThUk-
Uall,Large-DlantBteT,Stalnlesi 9 tvel, Dec Ircu latlon 8u
Piping at BUR Plants " Svt Hit gncl
DEYOUNO.R C Director's Office, Office of Inpectlon and
Enforcement, 82/1O/14 Consolidated Edison Co of Nu Vorfc
119pp 15810' I2S. 24X Fiche' 30-000, 82/1O/ 14> 820819023B,
92108&01&1 Confirm* schedule far B21O22 tifor cgment cunfarenca u/util
to Jlitut* potent!*! escalated enforcement action r* recent
identification of capped containment prenur-e tiniing lines.
SPE3SARD. R L Division of Project ti Resident Progrimi 02/10/15
MATHEW3, E, R. WUconsln Public Service Carp. Ip 1379 1 ? 007. S4K
Flche. 90-309.82/10/13,8210260161
118
DOCKETED ITEMS
B Riporfrable occurrences LEFi tt related eorreponiJ>nc
B2I01201B2 Dlicuiie* finding* T numeroui failure* of containment
flotation valve* All FalluTii reiulte-J fron Inopiraltte ASCO
Serin B3EO olenold vilv. uiiralla dui to nil In air
lupplv Valve* undergoing qualification
LANNIW9.M Director'* Office 00/06/2? Dinctor'i Office
2pp 13492 216 24X Fiche 3Q-29S, SQ/08/J2, S210I21HB2
0210040136 FoTuardi LEft 92-036/03L-0 & updated B1-Q-36/03X-I
QIEBLCR.C M Wlieoniln Public Service Corp B2/&7/24 KEPPLEH, J
Reoion 3, Office of Director IP 15582 317 24X
FIcfie 50-309, 82/09/34, B21Q040156
8210040159 LER B2-02a/Q3L-0 or. 920625, damper on Train A failed open
c-auilng loni iBiclal ventilation fin to i.tart automatically
Cjuird &v bad coll an lalenoid controlling exhauit Miter
inltt daropir Cell replaced
BEflKHOFT.B L HI icon* In Public Servici Corp &2/09/S4 Region
3, Of fit* of Director lp 15302 316 24X Fiche 50-303, B2/09/B4,
B21004015i
B21C-04QIi2 Updated LER 81-036/03X-E' an 61 1 1 03,motor drive auiiliaru
fenJuater lube oil pump continued to run uhen pump IA
itoppad Cauied ky exce-lv u*ar d mliili gnnint o-P lultch
llntagt mtchiniim Warn p*rti rplac*d
B-LANT,J L, Htacanitn Public Bsrvict Corp 62/09/21 Rigian 3,
Office of Dlnctor 2pp 155BE 31? SIX Flcht 90-309. BS/09/S4,
B2 10040 ISA
9210040354 IE Imp Htpti 50-282/92-13 i SD-30i/02~l5 on BK3JI H
noncomp lian ct notsd Major *rt*i infp*ct*<( prviaui
ifif icivnci 1 1 in prompt notlf ication/uarnlng njt
PATTEfiSON, J P Dlvition of Emargeney PTB par.dnm I l)i, T , 1 1 -..
Support 62^0^/09 4pp 15593 358 24 X Fit!,* SO-Mlll.D^C?'
B210040345 * u '
B2100B01S4 Forward! rvid Pagt 4 reflecting NRC gutdlntt (n
activation of puollc *lrt tc notification iv**r* OJ10I*
mirgtncu p]an utrcilt
WARD.E C Northtrn Stati Pouier Co 03/07/30 AKFIiiUN u L tt
3. Office of Director 2pp 13640 1 7S 24X richu SO ,'tfj GJ/;I V
8E100B0.1S4
621012050? Notification oF 921001 meting ui/1 1 c initl. DNL k frihnr'.
Planning ( Hg t. Jnc In Btth.id*,HD to ditcitii rsquiili far
tiinptlon from lOCFRSO.App fi riqulremcnt* re flrt
protic 1 1 on
DIIANNI.D C Qptratlng Ftiaeton Branch 3 Ha/O^/Jf) f(W>' t *
Operating Raacton Brinch 3 2pp 13672 346 34X
Fiche 90-292,03/09/23,821012058'?
B210260374 Ac* reenipt of FEMA S20526 1 tr re tvalu.Hpti of a'tLti
imergencv priparedniti for facility Bierciiv ti 4ti<icn|i-4
final tierciie evaluation! Offiite imerginc ij prtc*nifni n
defleitnctei ihould b> addr*ntd b</ utll
HIND.J A. Division of Emtrgency Preparedni 1 Uprrtt luntL fl ti
82/10/21 OILBERTBrD E Nor t turn State* Power Co Jit \ir *
24X Fiche- 50-BB2, 82/10/81, 0210260374
92101^0333 Formrdl LEfts 92-OB9/01X-1 & B2-C-3t/03L-0
OIEfiLER.C U Miiconln Public a*rvlc* Corp 82/10/11
Ftigion 3. Offlei of Dlrtctar. lp 1S742 E07 24X
Fiehf 3Q-305i B2/10/U. B2101W353
HEPPLEH.J
-8EJfll?03SS LER B2-Oa?/01X-l flTl BZ0927. d I icovirad that monthly tafltinfl
rtqulrsmtnti iioad'ad far tcntilrifnirt ri<fttioTi nanitort
R-ll tt fi-12 Cuid by pottpontmtnt of tsi-t dui to backup
radiation monitor bting out of ivc & ptrtannil ovtrilght
4 Miieaniln Public Strvici Corp B2/10/1I Atglati 3. OPFlci of
Olrtctor. 2pp 1S742 I OB 24XFichi 50-305,82/10/11,6210190393
-82 1 01 9035i LER 92-03 1/03L-0 on 320913, trl in ID of ihlvld bldg vint
filled to tailtch to E-vcirculitlan ifOdt *Ftir draulng v-icuun
Rtc ircu lotion d*rnprr filid to apin dui ta brottn hydraulic
punp on il ctro-JnjdrL)Uc dinptr actuator, Dptritor rtpljod
uEHNHOFT.8 L Hliconln Public SirvUt Carp. SS/10/I3 H>oion
3, OPfic* of DiTtctor. lp 15742 110 24 K Fich* SO-305, B3/IQ/1 1,
8210190393
8210240260 Foruarrfi LER 82-030/O1 T-0
QIE&LER, C.tf Hiiconiln Public Strvlci Corp 02/10/10
Rigion 3- Qfflci of Director lp I37f9 349 24X
Fiehi 30-305,
KEPPLER, J D
8210270Bi? Foruard* info clarifying 820630 ript, "I In Pial
Shutdown Analgtli in Compllanct W/10CFRSO, App R.Ontion
III O It Sjbitantive Ba*ii for Eiemptlan Rnuiti. " ptr
821001 jnteting u/NHC
HUSDLF.D- Northern States Powtr Co 63/10/2a llfflu
Reactor Regulation, Director 132pp I9B2? 0-1 V 3*1
Fiche SO-2B2, 63/10/22,8210270262
P Operating lie en-it itage documnt tt correi pondgnct
S21O0401B3 Submit* lupplenintal info re util OaOi M muni
to- Llcenin DPR-42 d DPR-iO "LOCA ECCS Limiting Jlritt t
EtpoiuTt Seniitivitij Analgiii for ENC XN-1 tt Xrl-lt Wtlotli
Prairie Island I " applln to both Unit* 1 8. U
rlUSOLFjJ) Northern State* Power Co B2/09/24 Offld
Reactor Rrgulatlon, Director lp 15901' 2O3 U4|f
Fiche 90-282- 02/09/24. B210040123
B21OOS0319 Forward* reiponia to Core Performanca OrtniK ^.'"U
T* methodi of monitoring core pouir dlitribu t ioni tar
C<;c le 7 opera tier
MUaOLF.D Northern atatti Power Co 02/07/HV (\ltni
Fttactor Aaoulattom Director 13pp 19610 260 J4I
Flcha 30-262, 92/09/2?, 0210050319
6210340263 LER B2-O30/OIT-0 an 821004. itniing HUM on all 1 1
contalnminfe pr*itur traninltttr* found capped off Intl4e>
rtnderlng traninl tteri inaptrable, Cautid by nFvtling capi
Inadverttnt lu pUcidi on end* of tenting 1 inei Capi removed.
MARCHI.tf L Mliconin Public Service Corp 03/1O/1S Rag ton 3.
Office of Director lp 1579? 349. 24* Flene 30-303-B3/10/1B.
&2 10340240
Q210l302iO Dlicunet Implementation of NRC guldatlnii In' un
hourii provided In Oaneric Ltr 82-12 Revlted guldelinn ij.r
been Implemen tadiu/nctpt ioni of 72-h per ul IlmlUUo- t
relief from control board dutlei
rlUSOLF.D Northern 8t*tei Power Co 02/10/07 (|fm >'
Reactor Aegulationi Director, Spp, 1S676 018 a + <
Fiche: 30-000- 0B/10/07.B210130260
V Operator
8210050263 Dticribt! Implvnantatl on of unior reactor operat-or upgrade
training to- complg w/WJHEO-07a7i I tem l.AS 1, "Senior
Reactor Operator Qua I i'lcatloni " All potential candidate*
cannot be examinid until Hag/Ju-ne of 1983
OIE9LER.C M Hlitoniin Public Service Carp, 02/09/29. DENTtWJ, H R
Office of Nuclear Reactor Regulation. Director 3po
24X Ftche' SO-305, 82/09/39, 02IOOW263
S210BiOl54 Advliei that modi required bu MJRE 0-0737, Hit Ml C 1 >
"Co-ntrol Room HBbltabUity< " ul 1 1 not be completed ur.nl
B30313 dut to delay* in receipt of matl d lainplln)
equipment.
HUBOLF. D Northern State* Power Co 82/10/22 Ufltli t' *.
Reactor Regulation. Director 3pp, 10799 012 S +
Fich:SO-2B2, 02/10/22,8210260134
Inspection report*, IE Bulletin* & eorrep andanc*
B210070007 Reipondt to FOIA requett for eight CAtiforUi <l ">*
iteam generator* 4 iteam turbine* App A documenti (ro^iril
in R Udell FOIA Requeit Sl-313 Foruiardi docirmentl llHtf )<
Aff B
PEL. TON, 0. N Dlvition of Rule* and Record*. 02/00/10 1C* S
MInthrop. Stimton. Putnan IcRoliertt 9pj>, 19649 0*1 3'T
Flche 30-OOOj 92/09/10,0210070007
BS10070139 FTiard* tabulated dat* on ct**m gn*r<Lr 1*11 I *
fad 1 1 tie*. Data ihould be provided to liceni*l
IPPDLITO-T. Operating Reactor* Atieitmint Branch ttW 3
VAROAiS Operating Reactor* Branch 1 9pp I5a41 111 !*
Ftche. 50-000, B2/OB/10, B210070007.
DOCKETED ITEMS
119
S21Q07O172 Forwards info re steam generator integrity & inpi at all
oplratlng PURi.per 790320 b 21 requests Details of Inspl.
including defect indications, tub* plugging criteria & tub**
plugged uill not be provided except for Point Beach 1.
OOLLER. K R Division of Rtactor Licensing (NRR-1973 onlg)
73/03/24 MACCARY. R R. Division of Technical Review (NRR-197S
only) 5pp ISMS 196 24X Fiehe 50-000, 88/08/10, 8210070007
9210040045 Forwards IE Imp Repts 50-382/62-15 fc 30-306/82-13 on
Baoaa4-29- No noncompliance noted
PAPRIELLO,C J Civilian of Emergencg PrBparedness b Operational
Support 83/09/10 LAR60N.C E Northern States Power Co 2pp
1339-3 35& B4X Fleha 90-502. 82/09/10, 8210040343,
S Reportable occurrences. LERi t, related correspondence
6310190726 Forward! LEfi S2-017/03L-0
KUSOLF.D Northern States Power Co 82/10/00 Region 3. Office
of Director Ip 13737- 144 24X Fiche 50-306,82/10/03,8210190726
--02IO190749 LER B2-017/O3L-O on BB0900, tuo undervolUge relagi found
to trip outside tolarancn band of 90 plus or minifi 2X a f
nominal voltage Causa not stated Relagt reealinr
HUN9TAD,A A Narthsrn States Pouier Co 82/10/03 Region 3,
Office at Director Ip 15737 145 S4X Fiche 50-306,82/10/00,
B21OI9O726
32I004O354 IE Insp Repts 50-2B3/B2-15 l> 50-306/03-13 on 820B24-25 No
TicncompUance noted Major areas inspected previous
dFicienc ie in prompt notification/warning igi
PATTERSON.J P , AXEL8QN.U L Division of Emergency Preparedness !.
Operational Support 82/09/09. 4pp 15993 338 24X
iFiche 50-2B2,B2/09/10,8210040345
B2]0130,5o3 Forwards "Inservice Insp-Exam Summarg. Prairie Island Nuclear
Generating Plant-Unit 11,820601-0709 "
HUSOLF, D Northern Stata, Power Co 82/10/03 Office of Nuclear
Keaetor Regulation. Director Ip 1S6B3 118 24X
Fieh- 30-306, 82/10/05,8210130363
&210I30566 Inservlce Insp rept on 820601-0709 Rept summarizes eiam
remltc of balance-of-plant tt eddg current exam of steam
generator tubing
ANHERSON.J1 T , SCMANEN, J F , DAHLMAN, L C Northern States Power
Co. B2/09/I8 100pp 19683119 24K Fiche 50-306, 82/10/09.
8810130563
B2GB19O233 IE Info Notice BO-33. Buppl 1, "Leaking It Dislodged 1-129
Implant Seeds Svc list enel
COBD.L I Division of Fuel Facilities, Material* b Safeguard!
e2/lO/06 Consolidated Edison Co of New Yoi-k 66pp 19761 350
34X Flchm 30-000,82/10/06, 620B190233
B21OI90432 A< t receipt of B20915 Itr informing NBC of steps tak an to
corTict violations notad In IE Insp Repts 30-202/82-11 &
SQ-30A/B2-1 1
SPESSARD, R L Division of Project S, Resident Programs B2/1O/07
LARSON, C E Northern States Power Co Ip, 18741 182 24X
Fiehe) 30-202,82/10/07.8310190433
B21O17D439 Responds to NRC 820317 Itr re violations noted In IE Insp
Rpte, SO-2B2/B2-11 fc 30-306/82-11 Corrective actions
startup program changed to normaliie flu* difference
channels
LAR8QN,C E Northern States Power Co 82/09/13 BTREETER , J F
Division of Project li Resident Programs 2pp 15741 IBS S4X
FlehB 30-282,82/10/07,8210190432
62 HM 50249 Aei receipt of 820928 Itr informing NRC of steps taken to
correct violations noted In IE Insp Repts 30-2B2/B2-I3 &
30-306/B2-13
BTREETER.J F Division of Projact & Resident Programs 02/10/08
LARSON. C. E Northern States Power Co, Ip 1B704 361. 24X
FicJit aO-2S2>82/10/00,B210190249
S210150295 Responds to NRC SB0902 1 tr re violations noted In IE Insp
Hapt* 30-282/82-13 b 30-306/B2-13 Corrective actions- dlesel
generator test procedures will ba revised bg 821201 &
Invai t ijative rept uill be discussed u/operators
LAFtBON'C E Northern States Power Co 82/09/28 BTREGTER-J F
Division of Project 8. Rasidant Programs 2pp 13704,342 34X
Flche. 90-3B3, 82/10/08. 02101 30249
S21OS801A4. FoTW*rds IE Insp Repts 30-282/82-16 I, 30-306/B2-16 on
02O9O1-17 & notice of violation
STREETER, J, F Division of Project i Resident Programs 83/10/13
LARSON- C. E, Northern States Power Co 2pp 19837 199. 24X
Fichi. SO-282, 52/10/13.8210280164
DOCKET 50-309 MAINE YANKEE ATOMIC POWER PLANT
F Security, madical> emergency & fire protection plani
6210070094 Forwards Amend 64 to Llcenie DPR-36 & notice of issuance &
availability Arnand requires meint of safeguards contlngencg
fc guard training b qualification plan
NEITHER, K L Operating Reactors Branch 3 93/09/1S OARHITY.J H
Maine Yankee Atonic Pouiar Co 4pp 19646 3S1 24X
Fiche 30-309,82/09/15,8210070054
621O0700S9 Amand i4 to Liceni* DPR-36, includ ing requirement to maintain
Commission approved guard training & qualification plan
CLARK, R A Operating Faactors Branch 3 82/09/15 2pp
358 24 X Fiche: 30-309,82/09/13,0210070034
8210O700AO Notice of issuance t, aval lab 11 itg of Amend 64 to License
DPR-36
CLARK. R A OjKratino Jfeactors Branch 3 82/09/15 3pp
15&46 357 24 X Fich 90-307,82/09/19.8210070094
Q21005O013 Rle*( public venlon of vol II of amBrgencg plan
FELTON, J H. Division of Rules and Records 83/09/16 Document
Management Branch Ip 1S622 321 24XFiche 30-309, B2/O9/1A,
9310050013.
8210050015 Forward* public version of Vol II of emergency pl*n Receipt
form encl
* Maine Yanfcee Atomic Paiuer Co 02/OQ/30 EISENHUT,D NRC -
No Detailed Affiliation Given, 2pp 15622222 24X
Ficne 30-309. e2/09/16i B210030Q13
B21O05001B Public veraion of Uol II of emergencg plan
Maine Vankee Atomic Power Co 02/07/12 211pp
34X Flche 30-309- 82/09/16,0310050013
15622 S?4
6210210136 Forujrda IE Imp Rpt 30-309/82-12 on B20726-30 No
noncomp liance noted
ALLANrJ M Rvglon 1, Office of Director 02/10/Ot RANDAZZA, J Q
MilTl* Yin 1*1 Atomic Pouer Co Bpp 15766 107, 24X
FUh*. 30-309, B2/lO/06iB21O210136
--B21O210142 IE Insp Rapt 50-309/02-12 on 020726-30 No none ompllanc o
no>t*d Major araa inipected follouiip of emergency
pT*par*ndess ibens from B1090B-15 appraisal
14OJNA8. E- J . CROCKER, H H Division of EmergenEg Preparedness t
Operational Support. 82/09/30, llpp. 13744 109 S4X
Fiche SO-307,aa/10/06, 82102I013o
8210210313 Foruar*! IE Safeguards Insp Rept 90-309/08-11 on 020719-21
1 notice of violation
MARTIN. T T Division of Engineering tc Technical Programs B2/IO/07
RANDAZZA, J B Maine Vanfcae Atomic Pouier Co 2pp 19764'227 24X
FieNt: 30-309, B2/1O/07, B210S10313
--82102103U NotlcB of violation from insp on 820719-21
* Division of Enginstrlng d Technical Programi 82/10/07 Ip
1S744 229 24X Fiche: 50-309, 82/10/07,8210210313
3210280171 IE Insp Repis 90-282/82-16 fc 90-30i/B2-16 or S20901-17,
Nonconpllance noted 1 failure to post no smoking sign in
fBty-rl*Ud equipment area* Ic operators found smoking.
DUBRV, N E, , REYEB.L Division of Project & Resident Program*
82/10/12. 6pp. 1BB37-202 24X Fi ch*. 30-282, B2/10/13, 821O2B0164
S20B190MS IE Bulletin B2-03, "Stress Corroaion Cracking in Thiek-
HllrLarg-Dlmeter,atalnles* Steel, Reclrculation 8ys
Piping at BUR Plants. ", Bvc list encl
DEYQUNOi R C Director's Office. Office of Inspection and
Enforcement 82/10/14 Consolidated Edison Co. of Neu York
115pp. ISS10.12S, 24X Ficht'SO-000,83/10/t4.820019033B.
8210210321 IE Safeguards Insp Rapt 3Q-3Q9/B2-11 on 820719-21.
Noncomp Kane* noted failure to establish SNM control t,
accounting procedures to assure that sources b datectors
rctlvd, controlled, Inventoried t (hipped properlg,
KUBHNERjlJ L,, CODY. A, T. Division of Engineering t Technical
Frogratns 82/07/14 7pp. 13764.230. 24X Flche- 30-309- B2/10/07,
9210210313
B21013017B Ack r*olpt of B20527 Itr informing NRC of steps taken to
correct violations not erf in IE Safeguards Insp Rept
30-309/81-02 Corrective actions withheld (ref 10CFR73 21).
MARTIN. T, T Blvlsion of Engineering fc Technical Programs 02/10/00
RANDAZZA, J.B. Maine Van* ee Atomic Pouiar Co 2pp. I3673'020 24X
FIeh. 30-309, S2X1O/08, BaJOl30l7B.
120
DOCKETED ITEMS
S3l02t30QB7 Advuei of recent changes to B30601 scuntu p ian, me luding
moving portion of perimeter security fence !< observa-i i on
toner to provide ad-fl area within protected area Changes do
not decrease ef f ec t 1 venei s of p!an
GABRITV.J H Maine Vanlne Atomic Pow.r Co 62/1O/21 DENTON, H R
Office uf Nuclear Reactor fltju ] aUon. Director Ip 1 SG37 134 24 X
Flche 50-307, G2/10/.21,B2103BO<}B7
hi General corr*i|>Dndnc*
ip-ondenc e
a21005023i Re&ponse opposing NFIC te util objection* to Soluble HE Pouer-
830930 addl specific contentions NRC b util itds sought to
be imposed are unfairly t improperly restrictive of
intervetior right to be fisard
MltLEft-D S Senible Maine Pouer MILLER. D S Miller, D S
62/09/30 Atomic Safety ant Licensing Board Panel 13pp
L56GB 34? 24)! Ficf-e 50-309.83X09/30,6210050336
E21Q0601TO RespoiM* opposing NHC & util 820915 repliei to State of HE
620330 addl con t*n t ions All contenti DTII should tie admitted
Certificate of Svc encl
AHflEHS.p Hair.*, State of B2/Q9/3Q Atmnic Safety. and Licensing!
EaariJ Panel 34pp 15613 340 24X FLche 50-309, B2/09/30.
8210040190
ruamf 1QCFH2 Su&parl D per B2090i request
GUTIERREZ, J H Hearing Branch 3 &2/IO/01 MILLER, D B
Miller, D S 9pp E5643 O30 24K Flche SO-3Q9, 82/ 10/01, G2100BQOi<7
G210I30314 Answer opposing Sensible ME 1 Pouer 830924 motion for
clarification fc m&iJ of ASLD 620113 order on sdmisiibtHty
D* contontioni Filing i) untimely & forbidden by
regulations Certificate of Svc end
DIONAN, r , GAD,H K Haine Vanlcte Atomic Pouier Co DIOWAH, T
Ropm ** Oraij 92/10/09 Atonic SaPstij and Licensing Board Panel
4pp lSt70 151 24X Fiche 50-309,92/10/09,8310130314
53)0150134 FDruardt ABLE 820715 partial InUlil decision in Gig Hocl
Point spent furl fool amend proceeding Eamo procedure^ r*
EIS ill ou Id be uied in instant caie
GUTlERflEZ.J M We4rino Branch 3 32/10/13 LAID, R H . HAND.C H ,
HQF1R1S.P A Atomic Safety and Licensing Hoard Panel 2pj>
15697 3fl6 24X Flche 50-309,82/10/13,3210150134
aaiOS0006& Ftepl^ opposing NRC !, applicant opposition to Sentibl* ME
Pouer motion for util disclosure nation ihould not b p
charac ternatf as premature discovery Info requested oaiic t,
esiential to orocveding Certificate of Svc encl
HILLEfl.D S Sensible Ka i ne Pousr MILLER, D S Mi 1 1 er, D 3
02/10/13 Atomic Safety and Licensing Board Panel Spp
15757 201 24X Fitfte 50-309. BS/10/ S3, B210Z00065
9210350^160 Rpspqnie opposinij Bentible HE P-owi r 8209^4 (Sation for
clarification t, mod oF ASLO B2041S order rifling On
admmibLlitij of Pciuier propoiei) cantentioni Motion merely
repeats argumenti already rejec terf Certificate of Svc and
GUTIERREZ. J M Hearing Branch 3 B2/IO/14 Atc-mlc Eafeti) and
Licensinj Doard Panel ipp 13703 106 24X Flcfie SO-SO 1 ?, 83/10/14,
8210150460
B21024O457 Forward* Saf Pomer fop ME. EG GarretliJB Green fc J Jfrabek
requeit for I isujnc-o of show came ord*r to lleense-v
MUBIlftY, p L Hurray, Plumb t, Kuri-aij MURRAV, P L Saf PWIT for
Main* 32/10/20 DtrBctor'i Offietj nfflee of Inspection and
Enforcement ip, 1 9BO7 123 B4K FlcJie 50-309.83/10/20.8510260*57
S21026,Q4fi5 Safe Pouer IDT ME, E9 O.rrett.JB Qrven tc J Jr*b,l r. quest
for t mo a tide of thou came orfler to licensee Adequate
financial bacting muat be ihoun to rail* capital required
to continue operations & to make capital fnveitntnt
rtUHHAv.P L Safe Power for Halne KUftnAY, P L MurFau, Pljmh &
Hui-rag 32/10/20 Director's office, Office of Iniptction and
Enforcement 6pj> 15B07 124 34K Pick* 30-309,92/10/30,
0210260457
6510380227 Comment* on URC B210I3 Itr to ASLB re contention! Dicliion
an mertti In Bip Rack Point cast dan na-t affect
idmif stb il i tij of cantentlenl- In instant caie
AHRENS.P Main*- State of 82/10/20 LAZO, R M . HAND, C, K ,
KORHIS.P A Atomic Safeti) and Licensing Board Panel Gpn
15S37 083 24X Fiche 80-307, 82/10/30,8210260227
rnu.it* fop docunenti
9210290303 First set o* Interrojatorles
Certificate of five end
KILLER, |> 8 San&lbU Maine Pour MILLER, D 3 HilUnB G
B2/10/25 Mains Vanl> Atomic Pauer Co 9pp 13853 170
Fiche 50-309,92/10/28,821-0370303
9210340202 Request* response to listed questioni re aMiflnnent at
pronnel during shutdown d nature ot uorl personnel till] hi
conducting at plant
BARROWS, J Haine Nuclear Referendum Committee
CLriRKifi A Operating Reactors Branch 3 Ip
Fiche 30-307. 82/10/31. B210B<M202
BS/10/2]
1S004 S70
P Operating licence stage documents E. correHpondsnca
S310040074 Advlie* that Itoms 1,2 ic 3 of NRC Conf irmatOru Artl&n Lti
Q2-01 have been satisfied per util S20202, S3 t, 030f] |tr
Approval for facilitg restart requoited
QAflRITViJ H Maine Yankee Atomic Poiuer Co 02/03/13 HAVNE'S C
Rsoion 1, Office of Director CLARK, R A Operating Hearten Hrj
3 Epp 155S1 141 24X Fiche 50-309, B2/03/ IS. B310040074
B2I001000Q R.ipondt to FOIA request for 19 categories of dgcvBftir r
nuclear reactor events & safetg problems Foriuardi docuninti
Uited In App A
FELTONj J M Division of Rules and Records S2/Ofi/ai5 UDElL.a i
Critlral Mass Energy Project 15pp 15737 009 S4X
Fch* 50-000.32/04/28,5310010009
9204270049 Recommends prompt attention be given to problia if TII
coolant pump closure stud corrosion dotec ted at FncjJHIri
Response -b u 820415 requested
EISENHUTiD Division of Licensing 82/03/24 HANAl>fl,9 K
Diviuon of Systems Integration (post 311005) 3po ti>s* pi
24X Fiche 30-0-00. 82/06/23, B310010008
8210040077 Aitvlici that refueling water storage tank ]vl iHptl-L
for au-tomatlc rec irculation actuation signal thould nol br
changed tn short term, per 390727 Itr
OftRRITViJ H Maine Vankee fltomic Pouer Co B2/07/2R HA>He.BI
Region I, Office of Director 2pp 15391 270 24K
Fich 50-307,92/07/30,9210040077
B21004D217 Submits addl info to 320727 Itr re refueling, uitir u :r n
tank UmB upper limit 5 uate r level louer limit Reanalym
of HPSH for ECCB performance included safeguards pumpi,
fluid i)i t< calculations of piping BUS
tfARRITV, J H Maine Yankee Atomic Pouter Co 02/07/39 IU.VMS I [
Region 1. Office of Director 2pp 15Sa3-ilB 24X
Fiche 50-309,92/07/37,8210040217
B20-?2i0514 Requests addl info re reflponaes to NUflEO-0737. IttR
III D 3 4, "Control Room HabI tabilii-y " Reiponie rnunlH
ulthin 60 ddijs of receipt of Itr
CLARK, R A Qperatins Reactors Oranch 3 52/09/01 OAfimll', J*
KiEne Ytrtle* Atomic Power Co 2pp 14947 KOI 24 X
Fiche 30-309, B2/09/01,8209210S14
B209210923 Informs of acceptabi 1 i tg of control room hbi Ulll Ll t H,
on llcemee r**ponses to NUREO-0737, Item III D 3 4
Concluiloti bued on preient plant igs & preumn
Implementation of effective HVAC mods
MURPKV.D U Battelle Memorial Institute, Pacific Norlhuit
Laboratory, FIN E-2323 B2/03/23 HULMAN. L Ac (Hint
Evaluation Branch 3pp 14747203 24X FJche ' 30-309,
S2092 10314.
9310050497 Forwards Amend 63 to License DPR-3t, tut t tu vt)uJ
notlc. of fs*u*nc t> availability Amend changes Tch Speu
maCifig limitinj conditions for operation mora restrictive
increaiing mtirvlllance requirements for vntll*tion tut
NFLSON.C C Op*rating Reactors Branch 3 &2/09/07
M*lne Ynfca Atomic Pouier Co 3pp 1362i 304 24K
Fiche:SOi-309j 82/O9/07, B21 0050497.
8810050503 Amend 63 to License DPR-36, changing Tch Bptct 1*
limiting conditioni for op ar *tion more restrictive (c
ncra*ing lUTveillance requirBmBnti for ventilation L
filter tig i.
CLARK, R A. Operating Reactors Branch 3 9S/09/Q7 H>f
I36S6 307. 24X Flche SO-309. 82/09/07iB210030'1-97
--8Z100S0503 BPiig evaluation supporting Amnil 63 to Ucrflii
Dffleo op Nuclear Reactor Regulation, I>lrB:tor
lift 13636.321 24X Fiche. 30-309, 83/09/07, B210Q5CH?7
B2100BOS09 Notice of issuance tt availabilitu o* Aratnd 41 li I *.
BPR-3A *
CLARK, R A
Operating Reactors Branch 3 B2/Q*}fQ7
24X Fiche. 30-309, B2/09/07, S210030-I97
DOCKETED ITEMS
121
B21QO4Q413 R-eq.ueits addl into re Q 10403 proposed mod to fech Spocs
concerning j-nuobtir surveillance Response requested within
3O days
CLARK. R A Operating Heactors Branch 3 02/09/11 GARRITY, d H
Maine Yankee Atomic Power CD 2pp 15597 235 34X
Fi-che 5Q-3O9. 82/09/14,3210040413
8210130360 Application to amend Ap-p A of License DPR-36. eonni*t ino. of
Propoied Change 92. modi *y ing Tech Specs to rastrict
op eration* uih en reactor protective ya channel* Ii ESF
actuation iyi liniors bypased,
RANDAZZA.J B Maine Yankee Atomic Power Co, B2/IO/07 CLARKi R A
Operating Reactors Branch 3 2p-p 1567? 1 17 24X
Fich* 50-309, B2/10/O7,Bai01303AO
e2lQO4Q423 Advim that ubil response to MJREQ-0737, I tern 1 1 K. 3 3.
"Reporting Relief 6 Safety Valve Failures !< Challenges."
accep tab l-e
HE I TWER, M L Operating Reactor' Branch 3 82/09/15 QAnfllTY.J H
Maine Yankee Atomic Power Co Spp 15597 S39 2-1X
Fiche 50-30?. 82/09/45. 9310040423
B21O13O3A7 Proposed change* to Tech Spec 3 9, r-es trie ting operations
uhn reactor protective &ys channel* !i EBF actuation *y*
sen*ors bypassed
* Ha in IP Vankee Atonic Power Co 82/10/07 ipp. 15679 119 2 -IX
Fiehe 50-309,92/10/07,8310130-360
6510070054 Forwards Amend 64 to License DPR-36 t. notice of issuance t,
availability Amend requires raaint of safeguard! contingency
-'* guard training & qualification plan
HEITWER.K L Operating Reactor* Branch 3 02/09/15 OARRITY. J H
Mains Yankee Atomic Ponier Co 4pp 13646 351 24X
Fiche 50-309.63/09/15,8210070054
S3 10070059 Amend 64 to License DPR-36. inc 1 ud ing requirement to maintain
Commission approved guard training !t qualification plan
CLftBK,R A Operating Reactors Branch 3 82/09/13 2pp,
156,46 355 34X Fiche 30-309,02/09/15,0310070054
B310G70060 Notice of issuance t, avai lahi 1 i tu of Amend M to License;
DPfl-36
CLARK, R A Operating Reactors Branch G 82/09/15 2pp
15646 357 24X Fiche 9O-309, 02/09/ 15, B310070Q54
B21G25Q367 Forwards audit rapt re procedures t< training on pressuriiod
ther-mal shod containing specific recommendation for
training program Requests summary of plans in response to
T tt ommendatiDns uitfiin 45 days
CLAHK, R A Operating Reactors Branch 3 B 2/09/23 &ARRITY .J H
Maine Yankee Atomic Pouer Co 34pp 15807 341 24X
FirhB 50-309,83/09/23.0210350267
OS1O060171 Application for amend to Tech Specs App A re Cgcle 7 core
p erf ornan c B analgsis
RAIJDAZZA. J Mama Yankee Atomic Pouter Co 02/09/2? Office of
Nuclear Reactor Regulation, Director 3pp 15614 06B 24X
iFiche 50-309,82/09/29,9310060171
821O27O008 Forward* Revision 2 to "Inservico Inap b Testing Pro-gram "
OARRITY.J H Maine Yankee Atomic Ptnuer Co 02/10/12 CLARH. R A
Operating Reactors- Branch 3 lp 15822 134 24 X
Hen* 50-309, 82/lO/12,B21037000B
B210S7OQO9 Reviiion 2 to 'Tnservlee Inip- EJ Taating Proflram "
JONES, D L Maine Yankee Atomic Pouer Co 92/09/21 133pp
ISB3S 135 24X Fich* 50-309,83/10/12,3210270008
0210220203 Forwards addl info re "Environ Qualification of
S*Petv-R>lati(f Electrical Equipment," Item A 1 HM W/n ancl
OARRITV, J H Main* Yankee Atomic Pouer Co S2/10/1B CLflRK, R A
Operating Reactors Branch 3 3pp 15776;35A 24X
Fich* 50-309, B2/lt>/18,aai-03BOa03
8210250098 Cl*Mfi NUrtEQ-0737, I tern 1 1 D 4 J , "Training for Mitigating
Core Damag-e, " per NRC B20714 reques-t All repldcement
llceniiad operator* & shift tcchnic-al advlvnr* receive
training prior to assuming duties
CARRITV.J H Maine Vankee Atonic Pouer Co 62/10/IB CLARK, R A
Operating ReactoJ-i Branch 3 2pp 19787 1 09 24X
Fiche 50-3O9, B2/1O/18, B21O2SO07B
B21O230212 Informs that saturation monitor upgrading delagad due to
e<LUi-prcent availability Rosemoutit reiiitance tamp detoctcri
(RTD) ulll lie u*if in conjunction iu/it0am tables to provide
adequate backup in case of Io*i of RTD indication
OARR1TY.J H Maine Yankee Atonic Power Co 02/10/19 CLASH, R A
Operating Reactor* Branch 3 2pp 15776-sa 1 ? 24X
Fich* SO-309, 92/1O/19, 0210220812
-SaiOO60173 ProposBii changes to Tech Specs re Cycle 7 core performance
analijs i E
Maine Yankee Atomic Power Co 02/09/29 36pp 15614 O71 24J(
Ftehe 50-309,82/09/27,6210060171
Notification of changed location for 021013 meeting lu/utils
in Be-the-sda, MD to dlscuis Cycle 7 reload package
H1TNER,K L Operating Reactors Branch 3 83/10/05 CLARK, R A
Operating Reactors Branch 3 lp 15076 220 24X
Fiche 50-309. 02/10/05. B210290160
0310290165 Notification of 021013 meeting u/utiU in Be thenTa, MD to
dltcuuo Cycle 7 reload package
HEITNER.K L Operating Reactors Branch 3 02/10/05 CLARK, H A
Operating Reactors Branch 3 2pp 1 5B66 360 34X
Fiche 50-309,92/10/05,9210290165
S31O13O2S2 Proposed Change 94 to License DPR-36, App A Hod renders RCB
pouei operated relief valves temporarily inoperable during
hydrostatic testing tuhen setpoint approached Approval
requested prior to startup of Cycle 7
RANDAZKt.J B Maine Yankee Atomic Power Co B2/10/07 CLARK, R A
Operating Reactors Branch 3 3pp 13678 042 24X
Fiche 50-309,82/10/07,3210130232
8210260420 Advi that mi tallafcion of isolation valvaa In Istrinuin,
team generator b 1 ouidoun tt auiiliary steam lire's uill not
tie completeif during 1982 refueling dti to late equipment
4>'liveri(. Initallatlon to be conpletvif tij n-eit oiitagv
OARRITY.J H Maine Yankee Atomic Power Co. 82/10/21 CLARKrd A
Operating Reactors Branch 3 lp. 15SO&314 24 X
Ficnt 50-309, B2/10/21 , 821O26042O
B210a001il Adviiee that selnnic design r-avteu re auiillaru feo>duiatar
si^i saismlc qualification uill 1 not b* cpmpletd as
committed to In vtt.1 B10B05 Itr but in accordance u/p]an
praiented In utll B20621 Itr.
OARRITV-J H Maine Yankee Atomic Pouer Co S2/10/22 CLARK, I) A
Operating Reactor* Branch 3 lp 15937:209 24 X
Fiche 50-309, 82/10/22, 0210230161.
Q Inspection report!. IE Bulletins b corre-ipondence
S21O07OOO7 Reiponili to FOTA request for oigJit <catagorie of rocoriS* re
stejn generator* b iteam turbines App A document* provided
in R UdilL FOIA Jtaqumt 81-313 Foruard* document* Hated in
App B
FELTONrJ M Division of Rule* and 1 Records 82/0 B/ 10- LOMO, D, J
Utnthrop, Btimson, Putnam t> Rnberts. 9pp 1SA45 043 24 K
Fiche 50-OQO, 82/Oe/lO, 8210070007
S3 IO1 30354 Proposed Tech Spec Pages 3 3-1 through 3 3-3, render Ing RCS
pouer-Qpera ted relief valves temporarilK inoperable during
hijdro-s tatic testing wlitn setpoint approached
* Maine Yankee Atomic Payer Co 82/10/07 3pp 1S67B 045 24X
Fiche 30-309,83/10/07,8310130252
9210130233 Proposed Change 95 to License DPfl-36, mod ifg Ing Tech Specs
to satisfy generic concerns re containment purge t> vent sijs
% tests required to verify valve operability for on-line
purge It leakage rate of isolation valves
flANQAZZA, J.B Maine Yankee Atomic Pouer Co 82/10/07 CLARH.fi A
Operating Reactor* Branch 3 3pp 15678' a 97 B4X
F L c ha- 50-307, 82/10/07, 8S101302S3
B21Q1302B& Proposed Tech Spec changes re containment purge b vent sgs
b tents required to veriftf valve operabi I ity for on-line
purge 5< leakage rate of isolation valves
flalne Yankee Atomic Power Co 82/10/07 Spp 1SA7B 30O 24X
Fiche 50-3O9,82/10/07,82101302B3
6210Q7O172 Forwards info re steam generator integr-Etij ti infp at all
operating PHRs. p"T 7S032O & 21 requent* Detail* of insp*i
including defect indication*, tube plugging crl-tvrla b tube*
plugged uill not be provided oxcept for Point Dach I.
OOLLER.K R Division of Reactor Licensing (NRR-1973 only)
79/03/24 MACCARV, R.R Dlvltion c-f Technical Rovliu (NRR-1973
only) Spp. 13643. 1^6 24X fiche 50-000,82/03/10,8210070007,
B210O7O3S7 Foruards IE Enforcement Conference Rept 30-309/B2-14 on
B20iO2 tc 0714 Ha noncomp 1 iance noted Enfrc emvnt action
pending It uill be foruiarded under separate covar.
8TARQBTECKI , R Divliion of Project b Rtiide-nt Pro D ram* 82/09/20
RAN0AZZA. J B Hln Yankee Atonic: Power Co 9pp 13634 062 24X
Fiche. 90-309, 812/09/2018210070357,
B2100703BI IE Enforcement Conferane. Rept 5O~30-?/a214 on 920602 tc
0711. Mo noncomplianc* note*, Ma jor arejii discussed NRC
concerns re dtiign change control l> event reporting
uakne*ss Identified in IE Insp Rept 50-309/02-O9,
SHETLAND,? , 9ALLO, R Division of Projact fc Resident Programs
82/09/09, Spp, 13634 064. 24X F eh e, 50-309, 02/09/20. B210070357
122
DOCKETED ITEMS
6210060302 Reiponrft to 820708 requnfc tor Jdd 1 info re control element
eitenblu fa fuel aitenblit fretting wear inipe
CAHRITYiJ II mini VanLii fttom ! c Psuiir Co B2/0?/2B CLASH. R A
Operating Re-iton Branch 3 4pp ISA I? 202 24*
Flche, SO-309. B2/OW28,B21006Q302
S21Q1S039B Faiurd< reipanie *D RC rBqueit for add I info rt IE
Bulletin BO-ll, "Haionry Hall Drflgn " All required (nod*
ineUllfd f>u 630301. Kith error detected yhicfi requires
itr*ngthning of uill mill b* accampl iih*d at If 63 outage
OARItm, J H Maine VinkBt Atomic Poutr Co 82/0-9/30 CtAflH. H A
Operating Reactart Dnnch 3 7Bpp 13703 SB4 34 X
Flch* 50-309, 82/09/30, 82I01!Oa?B
9 20 B 190233 IE Info Notice BO-33, Suppl 1, "Lealing t. Dlilcdgid 1-125
Impl-tnt BiJi " 6ve lilt incl
COBB.L I Divltion of Fuel Fitilititi, HaterUll S, Safigutrdl
B2/1-Q/06 Contolidated Ediian Co of Hem York 64pp 157il 250
24 X rich* 50-000. B2/1G/OA.S209I 90233
-B210S7Q177 LER B1-005/03L-0 on S10509, one of thi-ae BAB
ewitehei failed to eloie Cauitd by matl incom
Switch replaced w/improvBd model utillilng (talnleti
In place of bran
* Halm Van In Atomic Power Co 81/09/26 Report I,
Philadelphia, Office of the Director (Bl/03/On l p
B4K FIch t 30-309,81/05/26.8210370165
0210290267 Part SI dtfUianty rtpt r potsntlal gallinj. pTttllft l
tm ti Bonnat nf 1 2S-ineh d lrflr A105 carbon tteo-1 (,
A1B7-F22 vilv*f ttipplltd Feb IfBl-Aug 19Q2 Valwei ihoulj J f
KrvUad 6 itim 6 /or bonnot repUced
IBABELLE.L D Conval, Inc Q2/10/11 WAYNES, R C H^]on I
of ftlrtetor 17pp 15BS4 232 24X Fich 5O-000* B3/IOM1.
8210-290247
S21031001S Forward! LER B2-027/03L-0
WOODiE C Haln Y*nt Atomic Poiuer Co 02/10/12 lUjloi
Offict at DirtctDT lp 13766 021 24X Fichc 30-309,
821021001 3
8210210136 Formal-ill IE In*p R.pt 30-309/82-13 on 030726-30 Ho
none amp I ianei nottd
ALLAW, J H Rigion 1, Officr of Dlrotbor BS/ 10/04 RANDAZZA.J E
M*ini Vankti Atomic POUBT C 2pp 1 57iS 107 2HX
Flchv 50-30?, 82/10/06,0210210136
0210310142 IE Imp Rtpt 90-309/B2-L2 an 820796-30 No TiDncampl ianc ir
nottd hijor *TI Inipactitf o]louup of *mirgncy
prtparinJon ittni from 910908-13 appraitat,
UaJHAS,E J , CJIQCKERiH U DIviilon of Eniirgtncu Prtpjrcdnail Ir
Op*rationl Eupport B2/09/30 llpp 19766 107 24 X
Ficht 80-309,82/10/0^6210210136
8210210019 LER B2-027/03L-0 on 930929. conta i nment iioUtldi i l|-j
nfftn injection actuation sisnJl it**m stnirato-r blciuJ^gn
Valv> BDr-T-32 fiilnd to fulli; cloBi Cauaed by \oon icriu-
lodgd (t*tun iliik *< aeating surface Parts rplaca
NELSON, H H Min Vankft Atomic PouifT Co ES/lOi'13 Rtimj
Offlt* OP Dlr<tor lp 15766 022 24X Ftcfie 30-309, fitf/l O'Li
8210210019
0210260193 Foruardl LER S2-026/03L-0
HOOD, E C Hi In* Yinkut Atomic Powtr Co B2/1O/IQ Hiflfln. I,
OfCU* of Director IP 1DB04 272 24X Fich* SO-309. QlflQf Lfl
3210260193
8210210313 forujrdi IE Saf*g<u*rd* Imp R*pt SO-309/B5-11 on 830719-31
t natict of violation
KARTlNiT T Division of Enoiniirins t Tchnlcal Pvoor*m B2/10/07
BAKDAZZA, J B Halnt Yatitti Atomic Pouir Co 2pp 15764 227 34 X
FichB 50-309. 82/10/07,^210210313
--9210210316 Notict of vUUUon from imp on 020719-21
DiviilDn of EnglJittrlnj t Ttchnlcal FTogpairi B2/10/07 lp
15764 327 24X Flch* 30-309. a?/l 0/07*62 1 0210313.
8210210321 IE 3iftgmr<Ji Imp Ript SO-309/Ba-ll on B20719-21
HoncDinplldiicB no-Ud failure ti> titablnh SNH eontro-1 h
accounting procidurci to anui~ that isui-cti 1 -Jflttctari
nc (iv*d. control l*dj Invtntori erf t. ihipped praptrlij
KUSHHER.H,L , ODDY, A T DlvUion of ffnglntiriro A Thn(el
Programi S2/OWH 7pp. 19764>a30, ?4X FicJlt 50-309, B2/10/07,
BK 10210313
92101^0178 Ack ncalpt of 820927 Itr [nformlng HRC of itepi talin to
correct violations noted in IE Safeguard* Imp Rapt
SO-30?/B1-0? CorrtctivB action* uJthhlif (rat 10CFJJ73 21).
MAR T I Mi T T- Dlvltlon of Englnnring & Tichnieal Programi B2/10/Oa
FtAMDAZZAiJ D. hi in. VntiB Atonic Pouftr Co Sop 15673 020 34 X
Flch*' 50-369, 62/10'Oa, B2IOI30I7B
B21027000B Foruardi ftviiion i to "Innrvic* Imp d Ttitlng Proji-am "
OARHITY.J.H Malnt Vanl Atonic Poiur Co B2/IO./12 CLARK. R A.
Opirafelng RvattcTi Branch 3 lp JS822 134 24 X
Ftchf 90-309,62/10/12,6210270008,
--621027000 1 ? Rfvltion 2 to 'Iniervlet Intp (. Tttting Pro
JDNESjO L Hilnt Yantl* Atonic Poutl- C. BS/Qt/31,
15B22.13S 2*K Fich*. 30-339, B2/10/ 12, 9210270003
133pp
620917023-a IE BulUtin 82-03, "Strut Corroclon Cracking in Thlck-
WlliLara,~Diim*ttr.SUiM t it Steth Rvclrculation 9(ji
Piping t BWR PUnti. " 8vc Hit *ncl.
DEVOUNO,R.C. DlractOT'i Qffler Offic of Intpiction and
En fore* mint. 82/10/H Coniolidatid Eli inn Co of Hcu fort
119pp. ISQIO'129, E4X Ficht 90-000,92/10/14.6209190238
B3 1 0240 200 LER ?a-026/03U-0 on 620924. ont steam gen*rto
failn) to optrat* d tuo v*lv* operated -above Tech BJI
limit* during tait Cauied bij instrument drift Cautt u^
initrumint drift unknown
NELSOM.R H H*ini Vani.t Atomic Power Co 92/10/10
Offic* of Dirtctor 2pp 15B04 273 24X Ficht
B2 102601 93
Higlcn t
Foruarif* LER B2-028/03L-0
WOOD, E C Main* Vantit Atomic Poutr Co S2/10/1E1
Offio of Director lp 1579 146 24X Flch* SO-
BK10Z&OI99
831O260208 LEO 82-02B/03L-0 on B20929. conta Inmant liolilign L|<r,
Ttt rttultcd in unip*ctfrf opening of control *lfnt
drive fflichaniim coolir retui-n valve Caused bij op*n toll IT,
Agaitat ESF reiet panal valve twitch control rUy
NELSON. R H H*in* Yankee Atomic Pouiir Co Ba/ 10/10 Ri|iii
Offlc* of Dirtctor 2pp 13799 149 34X Ficli* 30-30!,o;/i: I
8210360 1 1 ? 1 ?
8210760327 LER B2-029/01T-0- tehiluld edd v currant tnU of tint
gntr*tor 2 tubai revealed tmall number of tubai irctedlij
tube plugjlng limit
OAftRlTVjJ H, Maine Yankee Atomic Pouer Co B2/IO/1Q PifUs
Office of Director lp 1SB01.362 24X Fichu 50-30*. OS'lt'J'Je
6510260337,
8210270343 LER B2-029/01T-1 eddy current test* on ltel jinMil
ttibei revealed 10 tubei etceeding tub* plugging limit Clulil
bv ihort radiui bind tube degradation Condition *lto
reported by ilmiler C-E plant
OARRIT'i'-J H Mftin* Yanhee Atomic Foultr Co 62/10/19 RIJ
Offie* o- Director lp. 1SBS3 02B 24X Ftefct. 90-309. IK/lfl'
ezl02?03*3
DOCKET 30-311 SALEM NUCLEAR OENERATINO STATION, UNIT 2
F Securlt^i madlcali emergency & fire protection plant
82102*0144 Fnruirdi addl info re IE Bulletin BO-ll. Tuo addl maionrv
mail* identified In fuel bldg One null located inuth of
pent fuel pool tc on* will adjacent to ventiUtian
pinthouiB. Det Ign adequacy mill be ri-evaluatif.
OARHITYi J.H. Maine Yankee Atonic Poorer Co 62/10/21. flLARK, R. A
Operating R-ector Srinch 3. 2pp. 15799, OB7. 24X
FJeJie 50-30?, 82/10/21, B2t0260I44
3 Reportable occurrenceti LERi b related correipondence
fl2lOS70l4S Foruarde LER 31-OOS/03L-0
HOODiE C Heine Yankee Atomic Putr Co BHJOZ/2k Utaion \i
Philadelphia, Qf'lee of the Dirictor (81/03/01). lp. 15922.385
24 If FI Ch ~ ' *** -*"*** **..*eei*iwei _. ^ . - ^ . _ ' *'^ < " <ai. i - -
8210290249 Friuar<li 19B2 FEHA/NRC obierved aiarciti icirtrla '*' 6-
eierciia Revltioni reflect changee agr*ed upon during BIO'W
meetlnj u/NRC t, FEHA
ZUPKO, J, H. Public Service Electric h Qa Co. of Keu Jtrill
B2/07/1&. HAYNE8.R C. Region 1, Office of Director H9lt
137B<?;OOa 24K Flche SO-273,82/09/16, 8210260348
BB 1026-03 IB F&rw*rdt eienption from requlremanti. of IOCFBSO *B T f" 1
pratectlcn of tmfi ihutdoun capability
VAR0A.S.A, Operating Reactort Braneh 1, 82/09/ii LH)fll",*t
PiiBll<: Svrvlc* Electric t Oai Co, of Neui J>T*g 3pf I WO id
34 K Flcfi,. 50-Z7H, B2/0?/16, 621026031B,
--8210360921 ExaAptlon from requirement* of 1OCFR80 48 rt I In n*
of iafe *hutdaun capability.
EIBENHUf, D. 0, Divleton of Licencing 82/09/1* PUli! &*"'
Electric b O*B Co of New Jeriey. 4pp, 19830 171 *
Ftche: 3Q-373. 92/09/14, 8210240510,
DOCKETED ITEMS
123
921oa&Q524 Safety evaluation supporting licensee request for exemption
from requirements of IQCFRSO 48 re fire protection of i*fi
shutdown capability
* Office of Nuclear Reactor Regulation, Director 02/09/16 3pp
15930 175 24X Fichu 50-272.02/09/16.8210260516
SaiCHJi0431 Forwards eiemptien from requirements of Section IV F 1 of
App E to IOCFRSO, to allow neit full-seal* emergency
preparedness eierclse at Facility to be conducted on or
about BS0939, granting S20709 request
VABSA.S A Operatins Reactor* Branch I 02/09/23 UDERITZ, R A
Public Service Electric & Qas Co of New Jersey 3pp 15636 337
24K Fiche 50-272,02/09/23,0210060431
--aaiO060433 Eiemption from I equipments of Section IV F I of App E ti
lOCFR50,to alloiu neit full-scale emergency preparedness
exercise at facility to be conducted on or about 02O927
Evaluation end
etSENHUT.D Division of Licensing 02/09/23 Public Service
Electric !. 0*4 Co of New Jersey Spp 15636 230 24X
Ffche 50-272,03/09/23.6210000431
P Operating license stag! document* & correspondence
e?IOO1000B Respond! to FO1A request for 19 categories of documents ro
nuclear reactor events d safety problems Foruards documents
1 i tted in App A
FEL-TOM.j M Division of Rules and Records 82/06/29 UDELL, R A
Critical Mass Energy Project ISpp 15737 005 24X
Fiche 50-000, B2/06/30, 0210010000
S Discusses addl required info to batter define potential for
cracking in reactor vessel noliles
MQOHAN, V S Assistant Director for Materials & Qualifications
Engineering 00/05/05 TEDESCQ. R L Assistant Director for
Licensing 2pp 15727 176 24X Fiche 50-000, 0S/06/2S, 621O01000g
-8203310099 Foruards memo re equipment malfunctions