Full text of "TITLE IST OF DOCUMENTS MADE PUBLICLY AVALIABLE VOL 4 NO 10"

NUREG-0540 
Vol. 4, No. 10 




October 1-31, 1982 



Office of Administration 

U.S. Nuclear Regulatory Commission 




% ^ V" 

***** 



Aviiiliiblc fmrn 
NRC/GPO Siiln 



nt of Dnairni'Mti 
l 1'nntiini Office 
Wnshmiium. I). 0. '^(MO? 

A yo.it 's subscription consisis of 1? ISSUDS (or 
this 



Sinqla copius of this, 

arc iiviiiliihli! from Niiiion.il Tctilmical 

Infurcn.UJon Snrvico, SprinqfmUl, VA 22 



icrofichi! of siiuilo tiopius <iui 
lu from NRC/GPQ Salos Prourom 
Washington. D, C. 2055B 



NUREG-0540 
Vol. 4, No. 10 



Title List of 

Documents Made Publicly Available 



October 1-31, 1982 



Division of Technical Information and Document Control 

Office of Administration 

U.S. Nuclear Regulatory Commission 

Washington, D.C. 20555 



CONTENTS 

Preface v 

Arrangement of Items by Docket Number ix 

Alphabetic Arrangement of Docket Items by Facility Name xvii 

Docketed Items 

Low Level Radwaste Disposal Sites Docket 27 1 

Domestic Licensing of Source Material Docket 40 1 

Domestic Licensing of Production and Utilization Facilities Docket 50 7 

Domestic Licensing of Special Nuclear Material Docket 70 328 

Packaging of Radioactive Material for Transport and Transportation of 

Radioactive Material Under Certain Conditions Docket 71 335 

Nondocketed Items 

10 CFR Commission Meeting Records 339 

ACRS Advisory Committee on Reactor Safeguards 339 

COMMISSION NRC Commissioners 340 

CONTRACT NRC Contracts and Modifications 340 

FOIA Freedom of Information Act Requests and Releases 347 

GEN TECH IS Generic Technical Issues 364 

I&E Inspection and Enforcement 365 

MISC Public Document Room Miscellaneous 366 

NUREG NUREG Reports and Related Correspondence 366 

ORG Correspondence with Other Organizations 370 

PR Proposed Rule 371 

PRM Petition for Rulemaking 374 

PROJ Projects - Predocket Licensing 374 

PT 21 Noncompliance Reports and Related Correspondence 374 

QA999 Quality Assurance Inspections 374 

REGGD Regulatory Guides 376 

RES Research and Technical Assistance Reports 377 

REVIEW GROUP NRC Research Review Groups 378 

SECY Position Papers Before the Commission 379 

STATE PROG State Programs 379 

TOPREP Vendor Reports and Related Correspondence 380 

WASTE MOT Nuclear Waste Management 383 

XPORTLIC Export and Import Licenses 384 

Personal Author Index 389 

Corporate Source Index 419 

Report Number Index 449 

Cross Reference of Enclosures to Principal Documents 45 1 

Appendix A Definitions of Docket 50 Categories A-l 

Appendix B Definitions of Nondocketed Categories B-l 



111 



PREFACE 

The Tide List of Documents Made Publicly A variable is a monthly publication. It contains descriptions of the in- 
formation received and generated by the U.S. Nuclear Regulatory Commission (NRC). This information includes 
( 1 ) docketed material associated with civilian nuclear power plants and other uses of radioactive materials and (2) 
nondocketed material received and generated by NRC pertinent to its role as a regulatory agency. As used here, 
docketed does not refer to Court dockets; it refers to the system by which NRC maintains its regulatory records. 
This series of documents is indexed by a Personal Author Index, a Corporate Source Index, and a Report Number 
Index, 

The docketed information contained in the Title List includes the information formerly issued through the Depart- 
ment of Energy publication Power Reactor Docket Information, last published in January 1979. Microfiche of the 
docketed information listed in the Title List is available for sale on a subscription basis from the National Technical 
Information Service (NTIS). See NOTES at the end of the Preface for the complete NT1S address. 

We encourage your comments, criticisms, and suggestions. In particular, if there are title descriptions that are not 
meaningful, please let us know so that we can correct the data base. In so far as possible, we would like this docu- 
ment to be a valuable part of your reference material. 

DOCKETED ITEMS 

The listings within Docket 50 are divided into the categories used for filing and searching in the NRC Public Docu- 
ment Room. Those categories are: 

A. Application/construction stage documents and correspondence 

B. Utility Preliminary Safety Analysis Report (PSAR), amendments 

C. Utility Environmental Report (ER), amendments and correspondence 

D. NRC Draft and Final Environmental (Impact) Statements (DES and FES), and correspondence 

E. NRC Safety Evaluation Report (SER), supplements and correspondence 

F. Security, medical, emergency and fire-protection plans 

G. Adjudicatory correspondence 
H. General correspondence 

I . Financial information 

J. Insurance and indemnity information 

K. Utility Final Safety Analysis Report (FSAR) and amendments 

L, Limited work authorization and related correspondence 

M. Antitrust correspondence 

N. Antitrust hearing transcripts 

O. Advisory Committee on Reactor Safeguards (ACRS) reports and correspondence 

P. Operating license stage documents and correspondence 

Q. Inspection reports, IE Bulletins and correspondence 

R. Periodic operating reports and related correspondence 

S. Reportable occurrences. LERs and related correspondence 

T. Hearing transcripts on non-antitrust matters 

U, Congressional/executive correspondence 

V, Licensing operators and related correspondence 



W. Decommissioning stage documents and correspondence 
X Onsite low-level wastes storage 

Appendix A sets forth those categories and describes [he materials available in each Omission of a category in the 
listing for a docket indicates (hat no documents in that category were filed in the time period of the report. 

The principal elements of the entries in the list are' 

(T) P Operating license stage documents & correspondence 







203090028 Responds to 820201 Itr requesting documents re environ qualification of 
electrical equipment All nonpropnetary repts will be provided to Franklin Research 
Ctr by 820408. Proprietary repts will be provided to NRC by 8205 10. 

MILLS, L.M. (7) Tennessee Valley Authority. (T) 82/03/04 VASSALLO. D B 
Operating Reactors Branch 2. Q Ip, 1216:254. 24XFiche: 50-259,82/03/04, 
8203090028. , | ^ A 







1. NRC/PDR Document category (see Appendix A) 

2. NRC Accession Number (year, month, day, and sequence number of item). 

3. Description of information contained in the document. 

4. Personal author(s). An asterisk in this position indicates ihat there is no personal author, 

5. Corporate, agency or nonindividual source. 

6. Date of document described. 

1. Recipient of document and NRC or corporate affiliation. 

8. Pages in this document. 

9. The NRC 48X microfiche designation for this document. This five-digit portion of this entry is the number of 
the microfiche copy of this document that is available to NRC staff who have access to 48X microfiche files 

10. This three-digit portion of this entry is the number of the frame on which this document starts. 

1 1. The 24X Fiche designation consists of the docket number followed by the date of the document and the acces- 
sion number for (he document. This designation provides the information needed by subscribers to the Na- 
tional Technical Information Service docket microfiche to locate the document fiche. 

12. If this space is blank, the document is available to the public only in the NRC Public Document Room, 1717 H 
St., N.W., Washington, D.C. 20555. If this space is filled, it gives other sources for copies of the document. 
The entry may be "Available at NRC" for sale; "Available at NT1S"; or "Available at GPO." 

The Docketed Items list is arranged sequentially by Docket Number, category, and then by date of principal items. 
Entries indented and preceded by a dash are items that were submitted as enclosures to principal items. In general, 
indented items are not in accession number sequence. If the docketed document has a con tract (FIN) number or a 
formal report number, it will appear in the last line of the item following entry 5. 

NONDOCKETED ITEMS 

The nondocketed items are divided into the categories used for filing and searching in the NRC Public Document 
Room. These categories and their symbols are: 

10CFR Commission Meeting Records 

ACRS Advisory Committee on Reactor Safeguards 

COMMISSION NRC Commissioners 

CONTRACT NRC Contracts and Modifications 

DISCLOSURE Financial Disclosure Information 

FOIA ~- Freedom of Information Act Requests and Releases 

GEN TECH I S Generic Technical Issues 



I&E Inspection and Enforcement 

MISC Public Document Room Miscellaneous 

NUREG NUREG Reports and Related Correspondence 

ORG Correspondence with Other Organizations 

PR Proposed Rule 

PRM Petition for Rulemakmg 

PROJ Projects Predocket Licensing 

PT21 Noncompliance Reports and Related Correspondence 

QA999 Quality Assurance Inspections 

REGGD Regulatory Guides 

RES Research and Technical Assistance Reports 

REVIEW GRP NRC Research Review Groups 

RM Rulemakings 

SECY Position Papers Before the Commission 

STATE PROG State Programs 

TOPREP Vendor Reports and Related Correspondence 

WASH Regulatory Publications Pre-NUREG Series 

WASTE MGT Nuclear Waste Management 

XPORTL1C Export and Import Licenses 

Appendix B sets forth these categories and describes the material available in each Omission of a category in the 
listing for a docket indicates that no documents in that category were filed in the time period of the report. 

The principal elements of the nondocketed items are; 

(7) NU REG- NU REG Reports and Related Correspondence 







8203090207 NU REG/CR- 1 672 V02 

/ RISK ASSESSMENT METHODOLOGY DEVELOPMENT FOR WASTE ISOLATION 
1 IN GEOLOGIC MEDIA. Technical Review of Documents 
| NUREG/CR-1262, NUREG/CR-1376, NUREG/CR-1377, NUREG/CR-1397 & 
(NUREG/CR-1608. -_^ - "O 

STEVENS, C.A., FULLWOOD, R.A., BASIN, S.L. Science ApplicrnionsTInc. 

FIN B-6694. SAI-262-8I-PA. 82/02/28, Division of Risk Analysis. 

1 23 p. Available at NRC, 4 $6,00. fl 21 76:21 7, f 



0- 




1. Nondocketed category 

2. NRC Accession Number (year, month, day, and sequence number of item) 

3. NRC Report Number 

4. Title and description of information contained in the document 

5. Personal author(s). An asterisk in this position indicates that there is no personal author. 

6. Corporate, agency or other nonindividual source. 

7. Contract or financial (FIN) number (if any). If the document has a secondary report number, it will appear 
following this entry. 

8. Secondary report number assigned by originator. 
9 Date of document described. 

10, NRC organizational recipient. 

1 1, Pages in document. 

12. All NUREG-series documents are available for purchase at NRC. Information on ordering documents is given 
below. All NUREG-series documents are also available at NTIS, Information on ordering from NTIS is also 
given below. 

13. Price for which NRC sells the document. 



vn 



U. The NRC 48X microfiche designation for (his document. This five-digit portion of this entry is the number of 

the microfiche copy of this document that is available to NRC staff who have access to 48X microfiche files 
15 This three-digit portion ol this entry is the number of the frame on which this document Mans. 

The Nondocketed Items list is arranged sequentially by Accession Number within category, Indented items pre- 
ceded bv a dash are enclosures to unmdented items. 



NOTES. 

1 The address for NRC is. 

Director 

Division of Technical Information and Document Control 

U.S, Nuclear Regulatory Commission 

Washington, D.C 20555 

To place orders, send check or money order, payable to the Superintendent of Documents GPO Deposit Ac- 
count holders may charge their orders by calling (301 ) 492-9530. 

2 The address for NT1S is: 

National Technical Information Service 
Springfield, Virginia 22161 

To place orders for or to obtain price information about NRC publications at NTIS, either write to NTIS or call 
the Sales Desk at (703) 557-4650. Specify the NRC report number and title when you place your order. Publica- 
tions can be charged to American Express credit cards; supply the chargecard number when placing your order 

3. The address for the PDR is: 
1717 H Street, N W, 
Washington, D.C. 20555 

To place orders, either write to the NRC PDR or call (202} 634-3274. When ordering documents listed in this 
publication, please identify the Document Accession Number for each citation. 

Paper copy and microfiche of the documents listed in this title list may be purchased. Reproduction charges for 
duplication areas follows: (1) paper to paper is SO. 05 per page except for oversized documents and engineering 
drawings, which vary from $0.50 to SI 00 per square foot; (2) microform to paper is $0.05 a page for pages on 
microfiche and is $0.20 a square foot for a full-size print or SO. 25 for a reduced-size print ( 1 8" x 24" ) of a draw- 
ing on an aperture card; and (3) microform to microform is $0. 10 per microfiche and $0 20 per aperture card. 
Orders completed for mailing or for a special delivery service will have an additional fee for the actual mailing, 
shipping, or delivery service rate. Unless a user requests special packing materials, there is no additional charge 
by the contractor for handling and wrapping materials. 

Please acknowledge a willingness to assume charges for all orders but do not send payments. Orders will be pro- 
cessed and mailed with a bill from Literature Research C ompany. An account may be established with the 
Literature Research Company by calling(703)-94l-801& 



vin 



ARRANGEMENT OF ITEMS 

Docket Name Page 

Low Level Ridwasfe Disposal Sites Docket 27 
27-010 Beatty, NV, U.S. Ecology, Inc. 
27-039 Sheffield, 1L, U.S. Ecology, Inc. 
27-047 Barnwell, SC, Chem-Nuclear Systems, Inc. 
27-048 Richiand, WA, U .S. Ecology, Inc. 
Domestic Licensing of Source Material Docket 40 
40-0017 Dow Chemical Co., Midland, MI 

Union Carbide Corp. , Grand Junction, CO 
Western Nuclear Corp., Jeffrey City, WY 
NL Industries, Inc., Niagara Palls, NY 



BV DOCKET NUMBER 



40-0299 
40-1162 
40-1202 
40-1341 



Tennessee Valley Authority, 
Chattanooga, TN 



40-2061 Kerr-McGee Chemical Corp., 
Oklahoma City, OK 

40-2259 Pathfinder Mines Corp., Rivcrton, WY 
40-3392 Allied Chemical Corp. , Morristown, NJ 
40-3453 Atlas Mineral, Inc., Denver, CO 

40-6622 Pathfinder Mines Corp., 
Shirley Basin, WY 

40-6659 Getty Oil Co. Petrotomlcs Co., 
Shirley Basin, WY 

40-7580 Fansted, Inc., North Chicago, IL 

40-8027 Kerr-McOee Nuclear Corp., 
Oklahoma City, OK 

40-8084 Rio Algom Corp., Moab, UT 

40-8102 Exxon Co. USA, Houston, TX 

40-81 1 1 Kennecott Copper Corp., Salt Lake City, UT 

40-8153 Lebanon Steel Foundry, Lebanon, PA 

40-8355 Amax Speciality Metals Corp., 
Parkersburg, WV 

40-8380 Rocky Mountain Energy Co., 
Broom field, CO 



e 


Docket 


Name 


Page 




40-8452 


Bear Creek Uranium Co., Casper, WY 


4 


1 


40-8502 


Wyoming Mineral Corp., Lakewood, CO 


5 


1 


40-8577 


Air Force, Dept, of, Vandenberg AFB, CA 


5 


1 


40-8602 


Silver King Mines, Inc., Casper, WY 


5 


1 


40-8610 


Stepan Chemical Co., Maywood, NJ 


5 




40-8632 


Army, Dept. of, Chambersburg, PA 


5 


1 


40-8681 


Energy Fuels Nuclear, Inc., Denver, CO 


5 


1 


40-8697 


Rocky Mountain Energy Co., Denver, CO 


6 


2 
2 


40-8698 
40-8714 


Plateau Resources, Ltd., 
Grand Junction, CO 

Cleveland-Cliffs Iron Co,, Cleveland, OH 


6 
6 


2 


40-8728 


Teton Exploration Drilling Co., Inc., 
Casper, WY 


6 


2 


40-8743 


Conoco, Inc., Denver, CO 


6 


2 


40-8745 


Ogle Petroleum, Inc., Casper, WY 


6 


2 
2 


40-8768 
40-8771 


Kerr-McGee Nuclear Corp., 
Oklahoma City, OK 

Mclapal Resources Co., Phoenix, AZ 


6 
6 


3 


40-8781 


Teton Exploration Drilling Co,, Inc., 
Casper, WY 


6 


3 


40-8786 


Uranium Resources, Inc., Richardson, TX 


7 


3 


40-8793 


Conoco, Inc., Denver, CO 


7 


3 


40-8820 


Amax Environmental Services, Inc. , 
Golden, CO 


7 


4 


40-8824 


Target Research, Inc., Wharton, NJ 


7 


4 
4 
4 


Domestic Licensing of Production and Utilization Facilities 
Docket 50 

50-3 Indian Point Station, Unit 1 
50-10 Dresden Nuclear Power Station, Unit 1 


7 
8 


4 


50-13 


Babcock & Wllcox Co. Critical Facility 


9 


4 


50-20 


Massachusetts Institute of Technology 
Research Reader 


9 



Docket 

50-22 

50-27 

50-29 

50-54 

50-57 

50-62 

50-70 

50-72 

50-83 

50-133 

50-142 

50-148 

50-151 

50-155 

50-160 

50-170 
50-182 
50-184 
50-186 
50-188 
50-192 
50-199 
50-201 
50-206 
50-208 
50-213 
50-219 
50-220 
50-223 
50-228 
50-237 
50-244 



Name 

Westinghouse Test Reactor 
Washington StateUniv. Research Reactor 
Yankee-Rowe Nuclear Power Station 
Union Carbide Research Reactor 
StateUniv. of New York Research Reactor 
Univ. of Virginia Research Reactor 
General Electric Test Reactor 
Univ. of Utah Research Reactor 
Univ. of Florida Training Reactor 
Humboldt Bay Power Plant, Unit 3 
UCLA Training Rector 
Univ. of Kansas Research Reactor 
Univ. of Illinois Research Reactor 
Big Rock Point Nuclear Plant 

Georgia Institute of Technology 
Research Reactor 

National Naval Medical Center 
PurdueUniv. Research Reactor 
National Bureau of Standards Reactor 
Univ. of Missouri Research Reactor 
Kansas State Univ. Research Reactor 
Univ. of Texas Research Reactor 
Manhattan College Research Reactor 
West Valley Reprocessing Plant 
San Onofre Nuclear Station, Unit 1 
Columbia Univ. Research Reactor 
Haddam Neck Plant 
Oyster Creek Nuclear Power Plant 
Nine Mile Point Nuclear Station, Unit 1 
Univ. of Lowell Research Reactor 
Aerotest Radiography & Research Reactor 
Dresden Nuclear Power Station, Unit 2 
Robert Emmet Ginna Nuclear Plant, Unit 1 
Millstone Nuclear Power Station, Unit 1 



Page 


Docket 


9 


50-247 


9 


50-249 


9 


50-250 


12 


50-251 


12 


50-254 


12 


50-255 


12 


50-259 


13 


50-260 


13 


50-261 


13 


50-263 


13 


50-264 


14 


50-265 


14 


50-266 


14 


50-267 


17 


50-269 




50-270 


17 






50-271 


18 






50-272 


18 






50-275 


18 






50-277 


18 






50-278 


18 






50-280 


18 






50-281 


18 






50-282 


19 






50-285 


22 






50-286 


22 






50-287 


23 






50-289 


26 




28 


50-293 


28 


50-295 


28 


50-296 


30 


50-298 


34 


50-301 



Name Page 

Indian Point Station, Unit 2 36 

Dresden Nuclear Power Station, Unit 3 41 

Turkey Point Plant, Unit 3 43 

Turkey Point Plant, Unit 4 45 

Quad-CitiesStation, Unit 1 47 

Palisades Nuclear Plant 49 

Browns Ferry Nuclear Power Station, Unit 1 5 1 

Browns Ferry Nuclear Power Station, Unit 2 54 

H. B. Robinson Plant, Unit 2 55 

Monticello Nuclear Generating Plant 58 

Dow Chemical Co. 60 

Quad-Cities Station, Unit 2 60 

Point Beach Nuclear Plant, Unit 1 62 

Fort St. Vrain Nuclear Generating Station 66 

Oconee Nuclear Station, Unit 1 67 

Oconee Nuclear Station, Unit 2 69 

Vermont Yankee Nuclear Power Station 71 

Salem Nuclear Generating Station, Unit 1 73 

Diablo Canyon Nuclear Power Plant, Unit 1 76 

Peach Bottom Atomic Power Station, Unit 2 79 

Peach Bottom Atomic Power Station, Unit 3 81 

Surry Power Station, Unit 1 82 

Surry Power Station, Unit 2 85 

Prairie Island Nuclear Station, Unit 1 87 

Fort Calhoun Station, Unit 1 89 

Indian Point Station, Unit 3 90 

Oconee Nuclear Station, Unit 3 93 

Three Mile Island Nuclear Station, Unit 1 96 

Pilgrim Nuclear Power Station, Unit 1 101 

Zion Nuclear Power Station, Unit! 102 

Browns Ferry Nuclear Power Station, Unit 3 106 

Cooper Nuclear Station 107 

Point Beach Nuclear Plant, Unit 2 108 



Docket Name 

50-302 Crystal River Nuclear Plant, Unit 3 

50-304 Zion Nuclear Power Station, Unit 2 

50-305 Kewaunee Nuclear Power Plant 

50-306 Prairie Island Nuclear Station, Unit 2 

50-309 Maine Yankee Atomic Power Plant 

50-3 1 1 Salem Nuclear Generating Station, Unit 2 

50-312 Rancho Seco Nuclear Generating Station 

50-313 Arkansas Nuclear One, Unit 1 

50-315 Donald C Cook Nuclear Power Plant, Unit I 

50-316 Donald C. Cook Nuclear Power Plant, Unit 2 

50-317 Calvert Cliffs Nuclear Power Plant, Unit 1 

50-3 1 8 Calvert Cliffs Nuclear Power Plant, Unit 2 

50-320 Three Mile Island Nuclear Station, Unit 2 

50-321 Edwin I. Hatch Nuclear Plant, Unit 1 

50-322 Shoreham Nuclear Power Station 

50-323 Diablo Canyon Nuclear Power Plant, Unit 2 

50-324 Brunswick Steam Electric Plant, Unit 2 

50-325 Brunswick Steam Electric Plant, Unit 1 

50-327 Sequoyah Nuclear Plant, Unit 1 

50-328 Sequoyah Nuclear Plant, Unit 2 

50-329 Midland Plant, Unll 1 

50-330 Midland Plant, Unit 2 

50-33 1 Duane Arnold Energy Center 

50-333 James A. Fltzpatrlck Nuclear Power Plant 

50-334 Beaver Valley Power Station, Unit 1 

50-335 St. Lucie Plant, Unit 1 

50-336 Millstone Nuclear Power Station, Unit 2 

50-338 North Anna Power Station, Unit 1 

50-339 North Anna Power Station, Unit 2 

50-341 Enrico Fermi Atomic Power Plant, Unit 2 

50-344 Trojan Nuclear Plant 

50-346 Davis-Besse Nuclear Power Station, Unit 1 

50-348 Joseph M. Farley Nuclear Plant, Unit 1 



Page 


Docket 


111 


50-352 


113 


50-353 


116 


50-354 


118 


50-355 


119 


50-358 


122 


50-361 


126 


50-362 


129 


50-363 


131 


50-364 


134 


50-366 


137 


50-367 


141 


50-368 


144 


50-369 


146 


50-370 


148 


50-373 


152 


50-374 


154 


50-382 


159 


50-387 


164 


50-388 


166 


50-389 


168 


50-390 


172 


50-391 


176 


50-395 


178 


50-397 


180 


50-400 


182 


50-401 


184 


50-402 


186 


50-403 


189 


50-404 


192 


50-405 


194 


50-409 


195 


50-410 


197 


50-412 



Name 

Limerick Generating Station, Unit 1 
Limerick Generating Station, Unit 2 
Hope Creek Nuclear Station, Unit 1 
Hope Creek Nuclear Station, Unil 2 
William H. Zimmer Nuclear Station, Unit 1 
San Onofre Nuclear Station, Unit 2 
San Onofre Nuclear Station, Unit 3 
Forked River Nuclear Station, Unit 1 
Joseph M. Farley Nuclear Plant, Unit 2 
Edwin I, Hatch Nuclear Plant. Unit 2 
Bailty Generating Station 
Arkansas Nuclear One, Unit 2 
William B. McGuire Nuclear Station, Unit 1 
William B. McGuire Nuclear Station, Unit 2 
LaSalle County Station, U nit 1 
LaSalle County Station, Unit 2 
Waterford Generating Station, Unit 3 
Susquehanna Steam Electric Station, Unit 1 
Susquehanna Steam Electric Station, Unit 2 
St. Lucie Plant, Unit 2 
Watts Bar Nuclear Plant, Unit 1 
Watts Bar Nuclear Plant, Unit 2 
Virgil C. Summer Nuclear Station, Unit 1 
WPPSS Nuclear Project, Unit 2 
Shewon Harris Nuclear Power Plant, Unit 1 
Shearon Harris Nuclear Power Plant, Unit 2 
Shearon Harris Nuclear Power Plant, Unit 3 
Shearon Harris Nuclear Power Plant, Unit 4 
North Anna Power Station, Unit 3 
North Anna Power Station, Unit 4 
La Crosse Boiling Water Reactor 
Nine Mile Point Nuclear Station, Unit 2 
Beaver Valley Power Station, Unit 2 



201 

203 

204 

204 

206 

209 

210 

210 

213 

21 5 

216 

218 

221 

222 

226 

228 

230 

234 

235 

238 

241 

244 

246 

248 

251 

254 

254 

254 

254 

255 

257 

258 



Docket Name 

50-413 Catawba Nuclear Station, Unit 2 

50-414 Catawba Nuclear Station. Unit 2 

50-416 Grand Gulf Nuclear Station, Unit 1 

50-417 Grand Gulf Nuclear Station, Unit 2 

50-423 Millstone Nuclear Power Station, Unit 3 

50-424 Alvin W.VogtleNuclear Plant, Unit 1 

50-425 Alvin W. Vogtle Nuclear Plant, Unit 2 

50-434 Surry Power Station. Unit 3 

50-435 Surry Power Station, Unit 4 

STN-50-437 Floating Nuclear Plant 

50-438 Bellefonte Nuclear Plant, Unit t 

50-439 Bellefonte Nuclear Plant. Unit 2 

50-440 Perry Nuclear Power Plant, Unit 1 

50-441 Perry Nuclear Power Plant, Unit2 

50-441 Seabrook Nuclear Station, Unit 1 

50-444 Seabrook Nuclear Station, Unit 2 

50-445 Comanche Peak Steam Electric Station, 
Unitl 

50-446 Comanche Peak Steam Electric Station, 
Unit 2 

STN-50-447 GESSAR-238 

STN-50-454 Byron Station, Unit 1 

STN-50-455 ByronStation, Unit2 

STN-50-456 Braidwood Station, Unit 1 

STN-50-457 Braidwood Station, Unit 2 

50-458 River Bend Station, Unit 1 

50-459 River Bend Station, Unit 2 

50-460 WPPSS Nuclear Project, Unit 1 

50-461 Clinton Power Station, Unit 1 

50-462 Clinton Power Station, Unit 2 

50-466 Aliens Creek Nuclear Station, Unit 1 
STN-50-470 CESSAR System 80 



Page 


Docket 


258 


STN-50-485 


261 


STN-50-488 


263 


STN-50-489 


267 


STN -50-490 


269 


STN-50-491 


269 


STN-50-492 


270 


STN-50-493 


271 


STN-50-498 


271 


STN-50-499 


271 


STN-50-508 


271 


STN-50-509 


274 


50-513 


276 


50-514 


280 


50-515 


284 


STN-50-518 


286 


STN-50-519 


287 


STN-50-520 




STN-50-521 


289 






50-522 


290 


50-523 


29 1 


STN-50-528 


293 


STN-50-529 


295 


STN-50-530 


296 


50-537 


297 


STN-50-546 


298 


STN-50-547 


298 


STN-50-553 


299 


STN-50-554 


301 


STN-50-556 


301 


STN-50-557 


301 


STN-50-566 


301 


STN-50-567 


302 


STN-50-584 



Name Page 

Sterling Power Nuclear Project, Unit 1 303 

Perkins Nuclear Station, Unit 1 303 

Perkins Nuclear Station, Unit 2 303 

Perkins Nuclear Station, Unit 3 304 

Cherokee Nuclear Station, Unit 1 304 

Cherokee Nuclear Station, Unit 2 304 

Cherokee Nuclear Station, Unit 3 304 

South Texas Project, Unit 1 304 

South Texas Project, Unit 2 305 

WPPSS Nuclear Project, Unit 3 306 

WPPSS Nuclear Project, Unit 5 307 

WPPSS Nuclear Project, Unit 4 307 

Pebble Springs Nuclear Plant, Unit 1 307 

Pebble Springs Nuclear Plant, Unit 2 307 

Hartsville Nuclear Plant, Unit 1 307 

Hartsville Nuclear Plant, Unit 2 308 

Hartsville Nuclear Plant, Unit 3 308 

Hartsville Nuclear Plant, Unit 4 309 

Skagit Nuclear Power Project, Unit 1 309 

Skagit Nuclear Power Project, Unit2 310 

Palo Verde Nuclear Station, Unit 1 311 

Palo Verde Nuclear Station, Unit 2 314 

Palo Verde Nuclear Station, Unit 3 316 

Clinch River Breeder Reactor 3 1 8 

Marble Hill Nuclear Station, Unit 1 325 

Marble Hill Nuclear Station, Unit 2 326 

Phipps Bend Nuclear Station, Unit 1 326 

Phipps Bend Nuclear Station, Unit 2 326 

Black Fox Station, Unit 1 327 

Black Fox Station, Unit 2 327 

Yellow Creek Nuclear Plant, Unit 1 327 

Yellow Creek Nuclear Plant, Unit 2 327 

Gibbsar, Glbbs & Hill 328 



Xll 



Docket Name 

Domestic Licensing of Special Nuclear Material Docket 70 

70-0007 ICN Pharmaceuticals, Inc., 
Irvine, CA 

70-0025 Rockwell International Corp., 
Canoga Park, CA 

70-0027 Babcock & Wilcox Co., Lynchburg, VA 

70-0033 Texas Instruments, Inc. , Attleboro, MA 

70-0036 Combustion Engineering, Inc., Windsor, CT 

70-0135 Babcock & Wilcox Co., Apollo, PA 

70-0143 Nuclear Fuel Services, Inc., Erwin, TN 

70-0223 California, Univ. of, Los Angeles, CA 

70-0278 Dow Chemical Co. , Midland, MI 

70-0364 Babcock & Wilcox Co. , Apollo, PA 

70-0371 UNC Naval Products, Inc., Uncasville, CT 

70-0398 Commerce, Dept. of, Washington, DC 

70-0416 Colorado State Univ., Ft. Collins, CO 

70-0633 Pan American World Airways, Inc. , 
Patrick AFB, FL 

70-0687 Union Carbide Corp., Tuxedo, NY 
70-0753 Wheaton College, Wheaton, IL 
70-0754 General Electric Co., Pleasanton, CA 

70-0820 United Nuclear Corp., 

Wood River Junction, RI 

70-0824 Babcock & Wilcox Co., Lynchburg, VA 

70-1 100 Combustion Engineering, Inc., Windsor, CT 

70-1 1 13 General Electric Co., Wilmington, NC 

70-1 143 Westinghouse Electric Corp., Pittsburgh, PA 

70-1 151 Westinghouse Electric Corp., Pittsburgh, PA 

70-1201 Babcock & Wilcox Co., Lynchburg, VA 

70-1257 Exxon Nuclear Co., Inc., Richland, WA 

70-1510 Nuclear Assurance Corp., Atlanta, GA 

70-1621 Duquesne Light Co., Pittsburgh, PA 

70-1739 Tri-State Motor Transit Co., Joplln, MO 

70-21 16 Lawrence General Hospital, Lawrence, MA 

70-2650 St. John's Mercy Medical Center, 
St, Louis, MO 



age 


Docket 


Name 


Page 




70-2748 


Scioto Memorial Hospital, Portsmouth, OH 


334 




70-2789 


Missouri, Univ. of, Columbia, MO 


334 


328 










70-2792 


Lower Bucks Hospital, Bristol, PA 


334 


328 


70-2873 


Puerto Rico, Univ. of, Mayaguez, PR 


334 


328 


70-2942 


Harper-Grace Hospitals, Detroit, MI 


334 


328 


70-2944 


Duke Power Co., Charlotte, NC 


334 


329 


70-2946 


Louisiana Power & Light Co., 








New Orleans, LA 


334 


329 










70-2949 


Arizona Public Service Co., Phoenix, AZ 


334 


329 










70-2955 


Bellow International Co., Washington, DC 


334 


330 










70-2957 


Florida Power & Light Co. , Miami, FL 


334 


330 










70-2968 


Cleveland Electric Illuminating Co., 




330 




Cleveland, OH 


335 


330 








Packaging of Radioactive Material for Transport and Transportation 


331 


of Radioactive Material Under Certain Conditions Docket 71 


331 


71-0030 


General Atomic Co. 


335 




71-0481 


Monroe X-Ray Co., Inc. 


335 


331 










71-5908 


Model: DOT-6M Type B, Babcock & 




331 




Wilcox Co. 


335 


331 


71-5926 


Model: GE-100, General Electric Co. 


335 


331 


71-5939 


Model: GE- 1500, General Electric Co. 


335 




71-6115 


Model: R1010-0032, Energy, Dept. of 


335 


331 










71-6346 


Model: FSV-U General Atomic Co. 


335 


332 










71-6347 


Model: FSV-3, General Atomic Co. 


335 


332 










71-6574 


Model: HN-200, Hlttman Nuclear* 




332 




Development Corp, 




332 


71-6601 


Model: CNS 8-120, Chem-Nuclear Systems, 








Inc. 


jj;> 


333 










71-6639 


Model: MH-1A, Army, Dept. of 


335 


333 










71-6677 


Model: LP-12, Energy, Dept. of 


335 


333 










71-6678 


Model: LP-50, Energy, Depl. of 


336 


333 










71-6698 


Model: NFS-4, Nuclear Fuel Services, Inc. 


336 


333 










71-6703 


Model: RG-I, General Atomic Co. 


336 


334 










71-6745 


Model; FSV-2, General Atomic Co. 


336 


334 










71-9001 


Model: IF-300, General Electric Co. 


336 


334 


71-9010 


Model: NLI-1/2, NL Industries, Inc. 


336 



Xlll 



[)<xkt< Name 

71-9034 Model. TRlGA-1, General Atomic Co 

71-9037 Model- TR1GA-2. General Atomic Co. 

71-9044 Model. GE-1600, General Elecmc Co 

71-9057 Model- FPD-100, General Atomic Co 

71-9079 Model. HN-100, Series 24 2A, Hlttman 
Nuclear & Development Corp. 

71-9080 Model: 9080. Hlttman Nuclear* 
Development Corp. 

7I-W8I Model. CNS-!600.Chem-Nuclear Systems, 
Inc. 

71-9086 Model- HN-IOO. Series I. Hlttman Nuclear 
& Development Corp. 

71-9089 Model HN-IOOS, Hiltinan Nuclear 
& Development Corp. 



Page 


Docket 


336 


71-9091 


336 


71-9094 


336 






71-9096 


336 






71-9098 


336 






71-9111 


336 






71-9150 


336 






71-9151 


336 






71-9167 


337 


71-9964 



Name 

Model: 30A&30B, Gulf Nuclear Co. 

Model: CNS I4-I95-H, Chem-Nuclcnr 
Systems, Inc. 

Model: CNS 21-300, Chem-Nuclear 
Systems. Inc. 

Model: UCC-20WC-2&2A, Union 
Carbide Corp. 

Model: CNS6-80-2, Chetn-Nuclear 
Systems, Inc. 

Model: PAT-2, Energy, Depl. of 

Model: HN-lOO, Series 3, Hlttman Nuclenr 
& Development Corp. 

Model: Type B.Amersham Corp, 
Model: LP-I2-1, Energy, Dept. of 



5 1 ' 



ALPHABETIC ARRANGEMENT OF 

Name Docket Page 

Low Level Radwaste Disposal Siles Docket 27 

Barnwctl, SC, Chem-Nuclear Systems, Inc. 

Beatty, NV, U.S. Ecology, Inc. 

Richland, WA, U.S. Ecology, Inc. 

Sheffield, IL, U.S. Ecology, Inc. 

Domestk Licensing of Source Material Docket 40 

Air Force, Dept. of, Vandenberg AFB, CA 

Allied Chemical Corp., Morristown, NJ 

Amax Environmental Services, Inc., Golden, CO 

Amax Speciality Metals Corp., 
Parkersburg, WV 

Army, Dept. of, Chambcrsburg, PA 
Atlas Mineral, Inc., Denver, CO 
Bear Creek Uranium Co., Casper, WY 
Cleveland-Cliffs Iron Co., Cleveland, OH 
Conoco, Inc., Denver, CO 
Conoco, Inc., Denver, CO 
Dow Chemical Co., Midland, MI 
Energy Fuels Nuclear, Inc. , Denver, CO 
Exxon Co. USA, Houston, TX 
Famteel, Inc., North Chicago, IL 

Getty Oil Co. Peirotomlcs Co., 
Shirley Basin, WY 

Kennecott Copper Corp., Salt Lake City, UT 

Kerr-McOee Chemical Corp., 
Oklahoma City, OK 

Kerr-McOee Nuclear Corp., Oklahoma City, OK 
Kerr-McOee Nuclear Corp., Oklahoma City, OK 
Lebanon Steel Foundry, Lebanon, PA 



27-047 


1 


27-010 


1 


27-048 


1 


27-039 


1 


40-8577 


5 


40-3392 


2 


40-8820 


7 


40-8355 


4 


40-8632 


5 


40-3453 


2 


40-8452 


4 


40-8714 


6 


40-8743 


6 


40-8793 


7 


40-0017 


1 


40-8681 


5 


40-8102 


4 


40-7580 


3 


40-6659 


3 


40-8111 


4 


40-2061 


2 


40-8027 


3 


40-8768 


6 


40-8133 


4 



DOCKET ITEMS BY FACILITY NAME 

Name Docket Page 

Metapaf Resources Co., Phoenix, AZ 
NL Industries, Inc., Niagara Falls, NY 
Ogle Petroleum, Inc., Casper, WY 
Pathfinder Mines Corp., R I vert on, WY 
Pathfinder Mines Corp. , Shirley Basin, WY 
Plateau Resources, Ltd., Grand Junction, CO 
Rto Algom Corp, , Moab, UT 
Rocky Mountain Energy Co., Broom Held, CO 
Rocky Mountain Energy Co., Denver, CO 
Silver King Mines, Inc., Casper, WY 
Stepan Chemical Co,, May wood, NJ 
Target Research, Inc., Wharton, NJ 
Tennessee Valley Authority* Chattanooga, TK 

Teton Exploration Drilling Co., Inc., 
Casper, WY 40*8728 

Teton Exploration Drilling Co,, Inc. , 
Casper, WY 40-8781 

Union Carbide Corp., Grand Junction, CO 40-0299 

Uranium Resources, Inc., Richard son > TX 40-8786 

Western Nuclear Corp., Jeffrey City, W Y 40-1 162 

Wyoming Mineral Corp., Lakewood, CO 40-8302 



40-8771 


6 


40-1202 


2 


40-8745 


6 


40-2259 


2 


40-6622 


3 


40-8698 


6 


40-8084 


4 


40-8380 


4 


40-8697 


6 


40-8602 


5 


40-8610 


3 


40-8824 


7 


40-134! 


2 



Dome*tk Licensing of Production and Utilization Ficllltln 
Docket 50 



Aerotest Radiography & Research Reactor 
Aliens Creek Nuclear Station, Unit I 
Alvin W. VogUe Nuclear Plant, Unit I 
AMn W. Vogtle Nuclear Plant, Unit 2 
Arkansas Nuclear One, Unit 1 



50-228 
50-466 
50-424 
30-425 
50-313 



7 
2 
5 

28 
301 
269 
270 
129 



Name Docket Page 

Arkansas Nuclear One, Unit 2 50-368 216 

Babcock&Wilcox Co. Critical Facility 50-13 9 

BailSy Generating Station 50-367 215 

Beaver Valley Power Station, Unit 1 50-334 1 80 

Beaver Valley Power Station, Unit 2 50-41 2 258 

Bellefonte Nuclear Plant, Unit I 50-438 271 

Bellefonte Nuclear Plant, Unit 2 50-439 274 

Big Rock Point Nuclear Plant 50-155 14 

Black Fox Station, Unit 1 STN-50-556 327 

Black Fox Station, Unit 2 STN-50-557 327 

Braidwood Station. Unit 1 STN-50-456 295 

Braidwood Station, U nit 2 STN-50-457 296 

Browns Ferry Nuclear Power Station, Unit 1 50-259 51 

Browns Ferry Nuclear Power Station, UniE2 50-260 54 

Browns Ferry Nuclear Power Station, Unit 3 50-296 106 

Brunswick Steam Electric Plant, Unit 1 50-325 159 

Brunswick Steam Electric Plant, Unit 2 50-324 1 54 

Byron Station, Unit 1 STN-50-454 291 

Byron Station, Unit 2 STN-50-455 293 

Callaway Plant, Unit 1 STN-50-483 302 

Calvert Cliffs Nuclear Power Plant, Unit 1 50-317 137 

Calverl Cliffs Nuclear Power Plant, Unit 2 50-318 141 

Catawba Nuclear Station, Unit 1 50-413 258 

Catawba Nuclear Station, Unit 2 50-414 261 

'stem 80 STN.5ft.470 1/11 



Name 

Comanche Peak Steam Electric Station, Unit 1 

Comanche Peak Steam Electric Station, Unit 2 

Cooper Nuclear Station 

Crystal River Nuclear Plant, Unit 3 

Davis-Besse Nuclear Power Station, Unit 1 

Diablo Canyon Nuclear Power Plant, Unit I 

Diablo Canyon Nuclear Power Plant, Unit 2 

Donald C. Cook Nuclear Power Plant, Unit 1 

Donald C. Cook Nuclear Power Plant, Unit 2 

Dow Chemical Co. 

Dresden Nuclear Power Station, Unit I 

Dresden Nuclear Power Station, Unit 2 

Dresden Nuclear Power Station, Unit 3 

Duane Arnold Energy Center 

Edwin I. Hatch Nuclear Plant, Unit 1 

Edwin I. Hatch Nuclear Plant, Unit 2 

Enrico Fermi Atomic Power Plant, Unit 2 

Floating Nuclear Plant 

Forked River Nuclear Station, Unit I 

Fort Calhoun Station, Unit 1 

Fort St. Vrain Nuclear Generating Station 

General Electric Test Reactor 

Georgia Institute of Technology Research 
Reactor 

GESSAR-238 
Gibbsar.Gibbs&Hill 
Grand Gulf Nuclear Station, Unit 1 
Grand Gulf Nuclear Station, Unit 2 
H. B. Robinson Plant, Unit 2 
Haddam Neck Plant 
Hartsville Nuclear Plant, Unit 1 
Hartsville Nuclear Plant, Unit 2 



Docket 


Page 


50-445 


287 


50-446 


289 


50-298 


107 


50-302 


HI 


50-346 


195 


50-275 


76 


50-323 


152 


50-315 


131 


50-316 


134 


50-264 


60 


50-10 


8 


50-237 


28 


50-249 


41 


50-331 


176 


50-321 


146 


50-366 


213 


50-341 


192 


STN-50-437 


271 


50-363 


210 


50-285 


89 


50-267 


66 


50-70 


12 


50-160 


17 


STN-50-447 


290 


STN-50-584 


328 


50-416 


263 


50-417 


267 


50-261 


56 


50-213 


22 


STN-50-518 


307 


STN-50-519 


308 



Name 

Hartsville Nuclear Plant, Unit 3 
Hartsville Nuclear Plant, Unit 4 
Hope Creek Nuclear Station, Unit 1 
Hope Creek Nuclear Station, Unit 2 
Humboldt Bay Power Plant, Unit 3 
Indian Point Station, Unit 1 
Indian Point Station, Unit 2 
Indian Point Station, Unit 3 
James A. Fitzpatrick Nuclear Power Plant 
Joseph M. Farley Nuclear Plant, Unit 1 
Joseph M. Farley Nuclear Plant, Unit 2 
Kansas State Univ. Research Reactor 
Kewaunee Nuclear Power Plant 
La Crosse Boiling Water Reactor 
LaSalle County Station, Unit 1 
LaSalle County Station, Unit 2 
Limerick Generating Station, Unit 1 
Limerick Generating Station, Unit 2 
Maine Yankee Atomic Power Plant 
Manhattan College Research Reactor 
Marble Hill Nuclear Station, Unit 1 
Marble Hill Nuclear Station, Unit 2 

Massachusetts Institute of Technology 
Research Reactor 

Midland Plant, Unit 1 
Midland Plant, Unit 2 
Millstone Nuclear Power Station, Unit 1 
Millstone Nuclear Power Station, Unit 2 
Millstone Nuclear Power Station, Unit 3 
Montlcello Nuclear Generating Plant 
National Bureau of Standards Reactor 
National Naval Medical Center 



Docket 


Page 


STN-50-520 


308 


STN-50-521 


309 


50-354 


203 


50-355 


204 


50-133 


13 


50-37 


7 


50-247 


36 


50-286 


90 


50-333 


178 


50-348 


197 


50-364 


210 


50-188 


18 


50-305 


116 


50-409 


255 


50-373 


222 


50-374 


226 


50-352 


199 


50-353 


201 


50-309 


119 


50-199 


18 


STN-50-546 


325 


STN-50-547 


326 


50-20 


9 


50-329 


168 


50-330 


172 


50-245 


34 


50-336 


184 


50-423 


269 


50-263 


58 


50-184 


18 


50-170 


17 



Name 

Nine Mile Point Nuclear Station, Unit 1 

Nine Mile Point Nuclear Station, Unit 2 

North Anna Power Station, Unit 1 

North Anna Power Station, Unit 2 

North Anna Power Station, Unit 3 

North Anna Power Station, Unit 4 

Oconee Nuclear Station, Unit 1 

Oconee Nuclear Station, Unit 2 

Oconee Nuclear Station, Unit 3 

Oyster Creek Nuclear Power Plant 

Palisades Nuclear Plant 

Palo Verde Nuclear Station, Unit 1 

Palo Verde Nuclear Station, Unit 2 

Palo Verde Nuclear Station, Unit 3 

Peach Bottom Atomic Power Station, Unit 2 

Peach Bottom Atomic Power Station, Unit 3 

Pebble Springs Nuclear Plant, Unit 1 

Pebble Springs Nuclear Plant, Unit 2 

Perkins Nuclear Station, Unit 1 

Perkins Nuclear Station, Unit 2 

Perkins Nuclear Station, Unit 3 

Perry Nuclear Power Plant, Unit 1 

Perry Nuclear Power Plant, Unit 2 

Phipps Bend Nuclear Station, Unit 1 

Phipps Bend Nuclear Station, Unit 2 

Pilgrim Nuclear Power Station, Unit 1 

Point Beach Nuclear Plant, Unit 1 

Point Beach Nuclear Plant, Unit 2 

Prairie Island Nuclear Station, Unit 1 

Prairie Island Nuclear Station, Unit 2 

Purdue Univ. Research Reactor 



Docket 


Page 


50-220 


26 


50-410 


257 


50-338 


186 


50-339 


189 


50-404 


254 


50-405 


254 


50-269 


67 


50-270 


69 


50-287 


93 


50-219 


23 


50-255 


49 


STN-50-528 


311 


STN-50-529 


314 


STN-50-530 


316 


50-277 


79 


50-278 


81 


50-514 


307 


50-515 


307 


STN-50-488 


303 


STN-50-489 


303 


STN-50-490 


304 


50-440 


276 


50-441 


280 


STN-50-553 


326 


STN-50-554 


326 


50-293 


101 


5O-266 


62 


50-301 


108 


50-282 


87 


50-306 


118 


50-182 


18 



Name Docket 

Quad-Cities Station, Unit 1 50-254 

Quad-Cities Station, Unit 2 50-265 

RanchoSeco Nuclear Generating Station 50-312 

River Bend Station, Unit 1 50-458 

River Bend Station, Unit 2 50-459 

Robert Emmet Ginna Nuclear Plant, Unit 1 50-244 

Salem Nuclear Generating Station, Unit 1 50-272 

Salem Nuclear Generating Station, Unit 2 50-3 1 1 

San Onofre Nuclear Station, Unit 1 50-206 

San Onofre Nuclear Station, Unit 2 50-361 

San Onofre Nuclear Station, Unit 3 50-362 

Scab rook Nuclear Station, Unit 1 50-443 

Seabrook Nuclear Station, Unit 2 50-444 

Sequoyah Nuclear Plant, Unit 1 50-327 

Sequoyah Nuclear Plant, Unit 2 50-328 

Shearon Harris Nuclear Power Plant, Unit 1 50-400 

Shearon Harris Nuclear Power Plant, Unit 2 50-401 

Shearon Harris Nuclear Power Plant, Unit 3 50-402 

Shearon Harris Nuclear Power Plant, U nit 4 50-403 

Shoreham Nuclear Power Station 50-322 

Skagil Nuclear Power Project, Unit 1 50-522 

Slcagit Nuclear Power Project, Unit 2 30-523 
South Texas Project, Unit 1 STN-50-498 
South Texas Project, Unit 2 STN-50-499 

nant, Unit 1 50-333 

Jnit? 50-389 



Page 

47 

60 

126 

297 

298 

30 

73 

122 

19 

206 

209 

284 

286 

164 

166 

248 

251 

254 

254 

148 

309 

310 

304 

305 

182 

233 

12 
303 

82 



N ame 

Susquehanna Steam Electric Station, Unit 1 
Susquehanna Steam Electric Station, Unit 2 
Three Mile Island Nuclear Station, Unit 1 
Three Mile Island Nuclear Station, Unit 2 
Trojan Nuclear Plant 
Turkey Point Plant, Unit 3 
Turkey Point Plant, Unit 4 
UCLA Training Reactor 
Union Carbide Research Reactor 
Univ. of Florida Training Reactor 
Univ. of Illinois Research Reactor 
Univ. of Kansas Research Reactor 
Univ. of Lowell Research Reactor 
Univ. of Missouri Research Reactor 
Univ. ofTexas Research Reactor 
Univ. of Utah Research Reactor 
Univ. of Virginia Research Reactor 
Vermont Yankee Nuclear Power Station 
Virgil C. Summer Nuclear Station, Unit 1 
Washington State Univ. Research Reactor 
Waterford Generating Station, Unit 3 
Watts Bar Nuclear Plant, Unit 1 
Watts Bar Nuclear Plant, Unit 2 
West Valley Reprocessing Plant 
Westinghouse Test Reactor 
William B. McGuire Nuclear Station, Unit 1 
William B, McGuire Nuclear Station, Unit 2 
William H. Zimmer Nuclear Station, Unit I 
Wolf Creek Generating Station 



Docket 


Page 


50-387 


230 


50-388 


234 


30-289 


96 


50-320 


144 


50-344 


194 


50-250 


43 


50-251 


45 


50-142 


13 


50-54 


12 


50-83 


13 


50-151 


14 


50-148 


14 


50-223 


28 


50-186 


IS 


50-192 


18 


50-72 


13 


50-62 


U 


50-271 


71 


50-395 


244 


50-27 


9 


50-382 


228 


50-390 


238 


50-391 


241 


50-201 


13 


50-22 


9 


50-369 


21ft 


50-370 


221 


50-358 


204 


STN-50-482 


301 



Docket Page 

50-513 307 

STN-SO-509 307 

50-29 9 

STN-50-566 327 

STN-50-567 327 

50-295 102 

50-304 113 



Name 

WPPSS Nuclear Project, Unit 4 

WPPSS Nuclear Project, Unit 5 

Yankee-Rowe Nuclear Power Station 

Yellow Creek Nuclear Plant, Unit 1 

Yellow Creek Nuclear Plant, Unit 2 

Zion Nuclear Power Station, Unit 1 

Zion Nuclear Power Station, Unit 2 
Domestic Licensing of Special Nuclear Material Docket 70 

Arizona Public Service Co., Phoenix, AZ 70-2949 334 

Babcock & Wilcox Co., Apollo, PA 70-01 35 329 

Babcoclc & Wilcox Co., Apollo, PA 70-0364 330 

Babcock & Wilcox Co., Lynchburg, VA 70-0027 328 

Babcock & Wilcox Co., Lynchburg, VA 70-0824 332 

Babcock & Wilcox Co., Lynchburg, VA 70-1201 333 

California, Univ. of, Los Angeles, CA 70-0223 330 

Cleveland Electric Illuminating Co., 

Cleveland, OH 70-2968 335 

Colorado State Univ., Ft. Collins, CO 70-0416 331 

Combustion Engineering, Inc., Windsor, CT 70-0036 329 

Combustion Engineering, Inc., Windsor, CT 70-1 100 332 

Commerce, Dept. of, Washington, DC 70-0398 331 

Dow Chemical Co., Midland, MI 70-0278 330 

Duke Power Co., Charlotte, NC 70-2944 334 

Duquesne Light Co., Pittsburgh, PA 70-1621 333 

Edlow International Co., Washington, DC 70-2955 334 

Exxon Nuclear Co., Inc., Richland, WA 70-1257 333 

Florida Power & Light Co. , Miami, FL 70-2957 334 

General Electric Co., Pleasanton, CA 70-0754 331 

General Electric Co., Wilmington, NC 70-1 113 332 

Harper-Grace Hospitals, Detroit, MI 70-2942 334 

ICN Pharmaceuticals, Inc., Irvine, CA 70-0007 328 

Lawrence General Hospital, Lawrence, MA 70-2116 334 



Name Docket Page 

Louisiana Power & Light Co., New Orleans, LA 70-2946 334 

Lower Bucks Hospital, Bristol, PA 70-2792 334 

Missouri, Univ. of, Columbia, MO 70-2789 334 

Nuclear Assurance Corp., Atlanta, GA 70-1510 333 

Nuclear Fuel Services, Inc., Erwin, TN 70-0143 329 

Pan American World Airways, Inc., 

Patrick AFB, FL 70-0633 33 1 

Puerto Rico, Univ. of, Mayaguez, PR 70-2873 334 

Rockwell International Corp., Canoga Park , CA 70-0025 328 

Scioto Memorial Hospital, Portsmouth, OH 70-2748 334 

St. John's Mercy Medical Center, St. Louis. MO 70-2650 334 

Texas Instruments, Inc., Attlcboro, MA 70-0033 328 

Tri-State Motor Transit Co., Joplin, MO 70-1739 334 

UNC Naval Products, Inc., Uncasville, CT 70-0371 330 

Union Carbide Corp., Tuxedo, NY 70-0687 331 

United Nuclear Corp., Wood River Junction, RI 70-0820 331 

Westinghouse Electric Corp., Pittsburgh, PA 70- 1 143 332 

Westinghouse Electric Corp., Pittsburgh, PA 70-1151 333 

Wheaton College, Wheaton t IL 70-0753 331 

Packaging of Radioactive Material for Transport and Transportation 
of Radioactive Material Under Certain Conditions Docket 71 

General Atomic Co. 71-0030 335 

Model; 30A&30B, Gulf Nuclear Co. 71-9091 337 

Model: 9080, Hittman Nuclear & Development 

Corp. 71-9080 336 

Model: CNS 14-195-H, Chem-Nuciear Systems, 

Inc. 71-9094 337 

Model: CNS 21-300. Chem-Nuclear Systems, 

Inc. 71-9096 337 

Model: CNS 8-120, Chem-Nuclear Systems, Inc. 71-6601 335 

Model: CNS-1600, Chem-Nuclear Systems, Inc. 71-9081 336 

Model: CNS6-80-2, Chem-Nuclear Systems, 

Inc. 71-9111 337 

Model: DOT-6M Type B. Babcock & Wilcox 

Co. 71-5908 333 



Name 



Docket 



Page 



Name 



Docket 



Model: FPD-IOO, General Atomic Co. 71-9057 336 

Model: FSV-I. General Atomic Co. 71-6346 335 

Model: FSV-2, General Atomic Co. 71-6745 336 

Model: FSV-3, General Atomic Co. 71-6347 335 

Model: GE-IOO,GeneraIElcctricCo. 71-5926 335 

Model: GE-1500, General Electric Co. 71-5939 335 

Model- GE-1600, Genera) Electric Co. 71-9044 336 

Model: HN-100, Series 1, Hittman Nuclear & 

Development Corp. 71-9086 336 

Model: HN-100, Series 2, 2A, Hittman Nuclear 

& Development Corp. 71-9079 336 

Model. HN-100, Scries 3, Hillman Nuclear & 

Development Corp. 71-9151 337 

Model: HN-100S, Hittman Nuclear & 

Development Corp. 71-9089 337 

Model: HN-200, Hittman Nuclear & 

Development Corp. 71-6574 335 

Model: 1F-300, General Electric Co. 71-9001 336 



Model; LP-12, Energy, Dept. of 
Model: LP-12-I, Energy, Dept. of 
Model: LP-50, Energy, Dept. of 
Model: MH-1A, Army, Dept. of 
Model: NFS-4, Nuclear Fuel Services, Inc. 
Model: NLI-1/2, NL Industries, Inc. 
Model: PAT-2, Energy, Dept. of 

Model: R1010-0032, Energy, Dept. of 
Model: RG-1, General Atomic Co. 

Model: TRIGA-1, General Atomic Co. 
Model: TRIGA-2, General Atomic Co. 

Model: Type B.Amersham Corp. 

Model; UCC-20WC-2 & 2A, Union Carbide 
Corp. 

Monroe: X-Ray Co., Inc. 



71-6677 


3JJ 


71-9964 


331 


71-6678 


33* 


71-6639 


JJi 


71-6698 


334 


71-9010 


J3fi 


71-9150 


33T 


71-6115 


33J 


71-6703 


M6 


71-9034 


J36 


71-9037 


336 


71-9167 


3*7 


71-9098 


1 


71-0481 


3J3 



DOCKETED ITEMS 



LOW LEVEL RADWASTE DISPOSAL SITES 

UiVET J7-OIQ QEATTV, NV. U 3 ECOLQGV. INC 



21026Q304 PHQ-V-Ba Oil on 021012, shipment of low level raduaste 
received from GE Vallecitas Nuclear Ctr containing boi m/ 
hole in side Admi ni stra 1 1 ve pen.ilty of *1500 levied Permit 
suspended indefinitely 

THDrlrtS.R I) Region 5, Orfice of Director 02/1O/J7 Ip 
15931 34>1 



DOCKET 27-0.1B HIGHLAND, HA, US ECtlLOGY, INC 



6210130130 PNO-v-92~Oia on B210O4. notif i od that shipment oF low I 
radmaste received on B209S7 from Smith Kline t, French Labs 
mas in violation of DOT regulations 47CFIJ173 393<d) ft 
173 4Q3Ib) Vendor license euspendBd effective 020923 
THCMAS.R D Region 9, Office nf Director 82/10/05 Ip 
13,73 039 



27-039 SHEFFIELD, IL. u s CCOLOGV, INC 



DOMESTIC LICENSING OF SOURCE MATERIAL 

DOCKET dO-0017 DDK CHEMICAL CO , MIDLAND, HI 



6210120320 Summary of 030908 steering committee meeting lu/lDNS, Sta to of 
IL USG5 f, US Ecology to discuss results nf Phase II portion 
or tritium migration study * to determine need for Phase II 
investigations Exhibits encl 

SIEFKEN, P L LP"i Level Waste Licensing Branch 02/09/20 
HAWKINS. E F Lou Level Waste Licencing Branch 6pp 15687 236 



6210100028 Responds to FOIA request for seven categories of documents 
re Doui Chemical Co & Incineration of low level raduastp 
Request For fee waiver granted Forwards listed documents 
FELTON. J M Division of Rules and Records B2/QB/20 WILSON. A K 
Affiliation UnJinouin 2pp 1574FJ 002 24X Flcho 50-264,02/00/30, 
8210100028 



6210120411 Notification of contract ticcuti on. Mod 5 to "Sheffield 
Trench Cap Study " Contractor Ufi I v at IL 

FUEENDR.C M TechniLal Assistance Contracts "ranch TIN 8-6968-.-: 
82/09/28 DAVIB.J . SIEFKFN,D Office of Nuclear Material Safqty (. 
Safeguards. Di rector Ip 15671 167 

- -8310130419 Mod 5. revising task repts delivery schedul e. increasing 
estimated c ost' revis ing voucher submittal & substituting 
updated Manual Chapter 3202, to "Sheffield Trench Cap Studg " 
PORTER. F W Illinois. Unw of, Urbana-t hampai go HAOAN, T f- 
Oivision of Contracts FIN B-i969-2 S2/09/2B 4pp 15691 160 

5^10030095 Joint motion to continue proceedings until 830201 to 
provide add] time for settlement negotiations Certificate of 
S.c *nt I 

LES8V,R p Hearing Branch 3 WETTERMrtHN, M J US Ecologg. 
Inc (Formerly Nuclear EngineBrlngl Q2/10/OI Atomic Safety and 

Licensing Board Panel 3pp 1 5604 S'-id 

S2100B0075 Qrdni' granting NRC ti applicant joint motion to continue 
proceedings until 03O201 

CGOI)HOPE,A C Atomic Safctu and Licencing Board Panel 32/10/06 
Oi'fice of the Eiecutive Legal Director Ip 156-13 367 



DOCKET 27-047 OARNWELL. SC. CHEM-NUCLEAR SYSTEMS. INC 

F-21QI2013S Consents to transfer of Licenses 16-13536-01 t- 46-19 S24-D1 
Irora Chem-Nuc lear 9ys, Inc to UMI Ho 1 d inos. I nc All c> i s ting 
obligations t> responsibilities under curront license uil 1 1 be 
applicable to tt binding upon subsidiary 

.,.,,. . Office of Nuclear Material Safety i SflPoguards, Di rec tor 
- Waste tlanagement, Inc 3pp 15672 I6/ 



DAVIS, J 
S2/09/07 



HU I ZENOA, P 



i.-J10120Hfl Confirm* 820910 arrangements for J Davis 020931 site visit 
prior to attending 820933-24 meeting; in Atlanta, CA 
PANODUHN, G C Lou Level Waste Licensing Branch 82/07/13 
FUIWIS.J Chm-NuclHar Suttem*. Ine Ip 19693 170 

B31012046S Trip rept of 820701-08 vUlt to Columbia, BC to attend State 
of SC hearings O n qualifications of Waste Mgt. Inc to conduct 
radioactive matl* operations under licenses currently held 
bu Chnm-Nuc I ear. Inc 

PANQuURN.0 C Loui Level Wste Licensing Branch 0H/07/17 
HAIWINS.E: r Loui Level Waste Licensing Dranch 4pp 13671 306 



--02101Q0239 Application for reneiual of Matl/uyproduc t Licenses 
31-00265-06,21-002^5-02. 21-00265-011, 21-00265-0'. BNM-I 253, 
STO-527 'j R-10B authorijing any byproduct matl hBtueen 
Atomic Numbers 3 I Q3, ti i tium, Po-210 & Am-24I 
HOVLE.H H Doui Chemical Co 73/06/25 2pp 1574B 115 
Flcha 50-264, 02/OB/20,aaiO!B002B 



DOCKCT 40-0279 UNION MHBIDG CORP , GRAND JUNCTION, Cfl 



8210250019 Formards "Investigation of Elevated Radioactivity 
Measurements Around Union Carbide Corp Inactive Tailings 
Area In Gas Hills, UY. " per License Amend 10 

WQNQ.T Union Carbide Corp 82/0//30 PTTENC1LL,H Uranium 
Recovery Licensing Dranch Ip 1UBOQ 260 

9210250021 "Investigation of Elevated Radioactivity Measurements rtrniind 
Union Carbide Carp Inactive Tailings Area in Qa s Hills. WV " 
Union Carbide Corp 0^/07/30 lOpp 15908 261 



83101902-16 Forwards "Semiannual ALARA Rep ti Jan-June 1902," por l.i 
Condition 17 

WONG, T Union Carbide Corp B2/07/03 LYON'i, P 
Licensing Dranch Ip 15757 001 



Uranium (locovnt-g 



8210190256 "Semiannual ALAfIA Rep t. Jan-June 190H " Otie oversne map 
encl Aperture card Is available In PDU 
* Union Caroide Corp 02/09/03 531pp 15759 003 

8210130607 Requests written declaration of intent or interest in tun 
listed tailings situations resulting In pollution & 
contamination of grounduater* of State of MY 

FRANCIS. E Wyoming. State of 02/07/07 LINEMAN. J Uranium 
Recovery Licensing Dranch 3pp 19692 335 

S3 10220471 Forward! ravisieo lauier limits of detection for ft-226 t. 
Th-230 in mater 

LYONS.P J Union Caroide Corp B2/09/2S PETTENQILL.H Division 

of Fuel Cycle t> htatarial Safety 2pp 19786 321 

82(0210530 Requeiti detailed breakdown of revised rsclamatiun cost 
ettlmat' in order to complete evaluation of 820 BO 4 
submlttal Info should be provided by 821030 

PETTENOILL.H J Uranium Recovery Lliensino Branch 82/09/30 
LVOMS,P Union Carbide Corp 2pp 15782 363 



DOCKETED ITEMS 



DO:KET 40-11*2 WESTERN NUCLEAR CORP , JEFFREY CITY. 



S2 10*30123 Forurdt IE Imp Rept 40-1 162/S2-OS on B20901 No 
noncomf I unce noted 

CROWN, Q Dlvmon of Vindor t Technical Program, B2/O9/29 
UELLEH. T Uesttrn Nuclear. Inc (subi of Phelps Dodge Corp t 2pp 
15770 Ml 



IE Imp Rent 40-1143/62-02 on 820901 Mo nonconp 1 lance Tinted 
fijor JrjJi inspected If mill ua.ite mjt activities 
SHOPENH.M rl . CAIN.C L , EVEflETT, R J Divliipn of Vendor 1 
technical Programs 82/09/21 4pp 15779 143 



Responds to 9507O6 1 tr commeriliiig on D6i IE dec omifli 
Of K*rr-McCee Rare Earbhs facility Final atatemant will 
recogniie site as alternative ttorage/d isposal site for 
other residue! in West Chicago. IL 

CUNNINGHAM. R E Division of Fuel Cycle & Material Safpti) 
CAHfLL.P C Environmental Protection Agency Jpp I59h0 Ol'i 

9310250315 Response to Korr-McOee 830133 rsnue-Bl fo r tonjo I i da t i an at 
License Amend 6 in/License Amend S for hadring purposes 
City dots not object Svc list end 

SPE1.MAH, H J Went Chicago. 1L SPELI1AN, H -J Haialil Sp e L ni.i" fc 
Asiociabet BS/ 10/22 Commi ss inner s 3pp 157'W S2I 



S ubro ]t) revieu of Split Roct Mill S3O630 annual technical 
e valuation of pirfornanci of tailingi (abanlTient Embankment 
pertorittii ai np(ttei) Ho Further action ntcesiarij 

GAHCIA.P J Uraniun Hecover v Licensing Branch B2/10/05 Uranium 

RefOvrrg Licensing Branch 2pp I57at 333 



DOCKET 40-2259 PATHFINDER MIKES ccnp , IIWERTQN, wv 



BaiOS7O054 Trip rapt nf 830326 site visit to tomplele annunl inB|' 
FRANCIS, E . KEARWeVpD Pabhfindep Mines Corp 
Pathfinder Kinei Corp 2pp 15026 111 



oacKer 40-1502 NL INDUSTRIES, me , NIAGARA FALLS, NV 

6210010418 Forward! IE Inp Rept ^0-1203/62-01 Inquiry conducted to 
determine whether formtrlv llcanseii site meats current 
criteria for release for unreitricbed e 

KIWJEHAW.J D Division at Enoineenng !, Technical Progiams 
B2/09/23 JACOBS, J L L IndustrlsJ- Inc 2pp 1 5570 217 

B3100I0429 IE Imp Rept 40-1202/82-01 on 020595-0702 Inquiry conducted 
tb determine oihtthr formerly licensed site meets current 
criteria For release for unrestricted use Site meets 

cTi,t*Tia 

jQHANSEN, J M , KIWNEMAN. J H Region 1, Of f ice of Dir ec tor 
3pp 1S570 21? 



8510150607 Forwards "Qujrterlij Effluent Man it on 119 Dopt.Apr Jtuno IV* 
per Licsnst Condition* 51 & 54 

NUOEHT.E L pabhfinder Minos Corp 0a/OS/31 bCAHANO, fl rt Ur.t 

Recovery Llceniing Branch |p 15715 330 

8310150613 "Quarberly Effluent Monitonng H Dp 1. Apr- June 1 <it] J " lln 
ovefiiie map end Aperture card is available in 1'DH 
* Pathfinder Mines Corp 03/09/31 IDpp 15715 321 

S2IOI30607 Requests written declaration of intent or interoit in tu 
listed tailings situations resultirig in pollution t 
contamination of groundua ters of State of UV 

FRANCIS.E lJ a nmlng, State of 62/07/O7 L INDIAN. ,1 Uranium 
Reco-very Licensing Branch 3pp 15692 335 



8210010^34 Foruardi "Summai-,, of Radiological Survey of NL I-ntf ustn es 
Mtagara Fails Plant-" final rept 

JACCBS. J L ML Iniluatriei, Inc 02/M/24 JDHANBEN, J Renion t 
Offic* of Dirsctor 3pp 15S70 332 

8210010440 "Sunuiurt of RJd.olog icsl Survey of NL Industries Niagara 
Falls Plant." final rept 
LEIGH.!) M NL Industries. Inc 79/05/31 137pp 15570 324 



DOCKEf 40-1311 TENNESSEE VALLEV AUTHORITY. CHATTAKaOGfl. TN 

9210050422 FINAL ENVIRONMENTAL STATEMENT RELArED TO THE DECOMMISSIONING 
OF EDOEMONr UHANIUH MILL Dprj.t Wo 40 -I3*i 7TiB t M 

Valley Authority) 

Offic* of Nuclear Hsterul Safety t, SafttiuarilstDirtct*,- 
4 Ba/0 o/30 3 2 0pp Ava.UoU at ^C 00 



^RR-HCOEE CHEHICAU CORP , OKLAHOMA CITV, 



SA T n r 'M' e ' D ' 1 B M * ^Plication tg a^end L(,ii. 
STA-5B3 to allnu dismantling of Bldgi 2,10.11 f. 21 
SKELLE/.M J Kerr-KcG.e Corp 82/09/14 WEISS, J) Ht. 
rfanaatment Branch Ip I5B36 314 f-'cfn't 



"u ir..s p "SS M ias. a s /Mfli * NIXCIM ' HA ""-I-F-I 



B31012O914 Adviies that equipment cost flnalys i s. ta 1 1 inga pond 
reclamation bond analysis d rec lamaU on bona lununaru 
consistent ui/approved reclamation plan for Pathfinder Lucti; 
Me Mill tdiJings pond 

SOLLefjaERGER, D , pETTCHUILUn J Uranium HeCQvury I ic en *ing llionih 
92/09/20 Uranium Recovery licensing Branch 3pp ISi!i7j O'/^ 

S210S20161 Forwards IE Insp Rept 40-2299/B2-O1 on Q2072V-29 ft nolici 
of violation 

BRDWN.O D Divulon of Vendor & Technical Program! D2/Q9/i!.' 
NUSENT. E L Patfifinifer Mines Corp 2pp 15770 033 

8310330165 Notice of violation Prom insp on 0^0737-29 

Division of Vendor & Technical Pronrams 03/09/27 In 
15773 060 ' 

B2) 0330171 IE Insp Rept 40-2259/83-01 on 020727-39 None nmp 1 1 fl nc o ml 
failure of personnel tp shouer or monitor for contamination 
prior to leaving mill restricted area 

UHrTTEN.JE , DROWN.fi C , EVERETT, R J Division of VentfQr A 
Technical Projrams 02/09/17 llpp 15770 061 



ALLIED CHEMICAL CORP , MQRRISTOUN, NJ 



fcf "" f 3 """" >n 830701 
are not proprietary 



t t 

ensing Branch Ip 1S716 33(, 



-0210270081 B.,u..ti pj^MBt of amtnrf i t ,, nft 
PPHC4 on for amend to Lic.ns, STA-563 t 
dinanHino of Bldjs a, 10,11 J, 21 



o al 



Ba 



DOCKET 40-3453 ATLAS MINERAL, INC , DENVER. CD 
921036007? Poruard, second Barter 1982 ^ai-Urli, ren 

l "' 



B3I0130'163 Rtitutiti Infp on hiarine to be h.l 
Ord.r CLI-82-S, , ,h"ji"!w B 



Atla, Mineral. 82/00/18 70pp 1BBIO 



839 



for 



E AtUi Hln.r.i. 



DOCKETED ITEMS 



521021C021 Reviews first quarter 1132 environ rnonitoring data ! dosa 
calculations for nearest receptor required bij License 
Coidition 47 Compliance W/40CFR190 stds mill be determined 
mtitn neu site becomes operational 

t,ARC!A,F> J , FETTENGtLl.rH J Uranium Recovery Licenung Branch 
B2/09/20 Uranium Recovery Licensing Branch 4pp I57G2 216 



8210230476 Responds to NRC B3DBI3 1 tr re violation* noted in IE insp 
rept Corrective actions hijh audible alarm setpoint reset 
Monthly surface contamination survey procedures improved 
RUSSELL, J E Pathfinder Mines Corp 82/09/O3 BROUN: D Rug inn 
4, Office nf Director 2pp 15779 131 



Issues Amend 10 to License SUA-917 in response to SI 1904 
request >j revised oy B2O43B Itr Amend add! Condition 54 
delineating line of authority betuieen radiation safety 
coordinator t, onsitfl individual 

SMITH, R D Uranium Hecovery Licensing Branch 83/09/30 Atlas 

Minerals 2p p 15783 311 

- 3310210525 Recommends issuance of Amend 10 to License SUA-917 in 
response to S1I304 request ! revised by B3Q43B 1 tr Amend 
adds Condition 34 delineating line of authority between 
radiation safety officer fc onsite individual 

OABCIA. P J . PETTEfJGfLL.H J Uranium Recovery Licensing Branch 
B2/09/30 Uranium Recovery Licensing Branch 5pp 1 57H2 313 



DOCKET 40-66S9 GETTY OIL CO - PETROTQM1CS CD , SHIRLEY BASIN, HV 

8S1022051O Forward* correspondence to & from State of MY re 
unauthorized disposal of raduaste in (J mill tailings 
d i sposa 1 fac t 1 i t i es 

PFAFF.S J Getty OH Co IPetra tomi c s ) B2/OB/26 PETTENOILL' H J 
Uranium Recovery Licensing Branch 4pp 1 57B6 117 

9210310254 Forwards marked-up 1 tr from Gutty Oil Co to State of HV 
indicating that requested info re wells b piezometers is 
on file at NflC Elpresses desire for interagency cooperation 
ACKERMAN.W C Wyoming. State of S3/0?/14 SMITH- D Diviuion of 
Waste Management 4pp 15774 320 



DI'CKET 40-6(-32 PATHFINDER MINES CC1RP , SHIRLEY BASIN, WV 



ari055G03B Forwards State at WV B20731 request for 
seepage 1 820721 response 

RUSSELL J E Pathfinder Mines Corp 62/07/29 
No Detailed Affiliation Given 5pp 1 5793 343 



info re tailings 
PETTENQILL, H NHC 



2IOI5060I forwards one oversi/e revised topographic map per License 
Condi i- 1 on 41 Aperture card is available in PDR 

SMITH, J C Pathfinder Mines Corp B3/OEI/06 Uranium Recovery 

Licensing Branch Ip 19715 335 



8310130638 Advises that remedial actions proposed by licensee in 
response to B1I1I3 IE Mill Appraisal Rept 4O-fi659/Bl-01 
sufficient to correct weaknesses Ho licensing action mill be 
required 

JONES. S t , GARCIA, P J Uranium Recovery Licensing Branch 
B3/09/20 Uranium Recovery Licensing Branch Epp 15672 269 

6210210837 Revieui environ monitoring data '< 40CFRI90 dose calc ulationu 
for Petrotomics Mill, lit response to B20604 Itr NRC LOniurs 
w/results submitted by licensee 

JONES.S Z , PETTENOILL.H J Uranium Recovery Licensing Branch 
B2/09/30 Uranium Recovery Licensing Branch 5pp 157B2 3IB 



a: 10100415 Forwards "Subsurface Migration Update 6 Ansuers to NR(- 
Guestions ' 

MUtfDO:C.E S Pathfinder Mines Corp FJ3/QB/Q<b SHLLENfleRGER. D 

Uranium Recovery Licensing Branch IP 15747 330 

--Ei21u[B34PO "SubiuifaCB Migration Update & Answers to NRC Oueations 
tight oversiie drauings one I Aperture cards aro available in 
PDR 

;,UHlKICk.E S , SMITH. J C Pathfinder Mines Corp 83/O3/31 /6pp 
15747 221 

O = 100703i33 Forwards IE Insp Rept 40-6622/BS-02 on 030713-16 i notice 
at violation 

D Division of Vendor f, Toclinical Programs B2/OQ/I3 

.J E Pathfinder Mines Corp 2pp 1 S633 3IB 



DOCKET 40-7580 FANSTEEL, INC , NORTH CHICAOO. IL 

B210280L80 Ac k receipt of 520903 Itr informing HUG of steps taken to 
correct violations noted in NRC B20B13 Itr i notice of 
violation Addl info requested ulthtn 10 days 

BRDyiJ.G D Division nf vendor t Technical Programs B3/IO/25 
PIERHET, J A Fanstee] Metals (subs of Fan uteel , Inc ) Ip 
15937 019 

B2102Q01B<t Reipondi to NRC B20813 Itr & notice of violation C or^ac UVH 
actions portable radiation detection instruments calibr 
against tuo refi & lagged in lab log book 

PIERRET.JA Fansteal Metals (subs of Fansteel. Inc I G2/Q9/OJJ 
BROWNi G D Division of Vendor d Technical Program* Ip 
1SS37 020 



-8310070365 Notice of violation from I nip on B30713-I6 

a Division of Vendor !. Technical Programs 82/08/13 2pp 
1S631 320 



DOCKET -10-8027 KERR-MCGEE NUCLEAR CORP , OKLAHOMA CITY, OK 



- -03100703'?'! IE Insp Rept 40-6632/63-02 on G2Q713-I6 Noncompl lance noted 
on 920715, audio I B alarm setpolnt on survey instrument 
adjusted to level eicuadinj acceptable limit 

CAIN. C L . MURRAY. B . EVERETT, R J Division of Vendor (- Technical 
Programs G3/OB/10 ?pp 15633 322 



B2102&D543 Forward i application far amend to Licanse QUD-lOlO to 
construct it operate sludge calcining plant for purpose of 
converting rafFlnate sludge to readily disposable form 
SH6LLEY.W J Kerr-McOes Curp B2/09/01 PAQE, R Q Uranium Ful 
Llcgniing Branch 3pp 15831 091 



B?l0240013 Foruaril) revisad environ QA program, per Amend 7 to License 
SUA-442 

SMITH, J C Pathfinder Mines Corp B2/OB/3G Uranium Recovflry 

Licensing Branch Ip 15314 160 



9210240949 Application for amend to Licence SUB-1010 to construct I. 
operate iludg* c'lclning plant For purpose of converting 
raffinate slurfgo to rraillly iflaposshl* Form Ovenlie 
drauingi encl Aperture cards available in PDR 
Kerr-McOe* Corp 03/09/01 133pp 15831 094 



--9210260014 Revised environ QA program 

* Pathfinder Mines Corp 03/08/31 92p p 



B21029Q177 Forwards stability review for Number S embankment per 
Condition 43 of Amend B to License 5UA-442 Rept gives ftrong 
evidence that Number 3 embankment functioning according to 
design features 

RUSSELL, J E Pathfinder Mines Corp B2/09/I4 BQLLENBEHO Uranium 
Recovery Licensing Branch llpp 1 5B7<b 233 

6210120644 Advises that preliminary review of application far renewal 
of License SUA-442 complete General content acceptable but 
add] info will oe needed Current license valid during period 
at review of renewal application 

PETTEIJOILL, H J Uranium Recovery Licensing Branch 82/09/30 
RITCHIE, M 1 Pathfinder Minn Corp Ip 13404 233 

9210520444 Acb receipt of B20903 Itr informing NRC of atepi taken to 
correct violations noted in IE insp rept 

DRCMJ, G D Region 4, Office of Director 82/09/27 RUBBELL.J E 
Pathfinder Mines Corp Ip 1S779 130 



aai02A0365 Foruiardi OK Btate Dipt of Heal th. Industrial Uitte Mg t Div 
B 20824 Itr transmitting draft permit for uge of deep 
disposal uiell for permanent disposal of treated raffinatei 
in ref to application for amend to License SUB-1O10 
SHELLEY. W J Kerr-McOee Corp 82/08/26 PACE- R Uranium fuel 
Licentino Branch 6pp 15814 349 

8310260976 Forwards initial comments pn DK State Dept of Health drift 
permit for use of dep dispotal uell & replacement Page 1 to 
parmiti correc ting nitrogen limit Page should be inserted 
into 820826 Version 

6HELLEY.W J Kerr-McOee Chemical Corp dub* of Kerr-rlcOee Corp ) 
82/OB/31 PAOE,R fl Uranium Fuel Licensing Branch 3pp 
19814 361 

B2102S04B7 Reipondt to B20824 Itr outlining addl requirement* for 
injection uffl 1 permit Raqueiti option to operate wall at 
pressures equal to pump capacity of 400 p<i Const method! J< 
map at propaod monitoring location >nc 1 

SHELLEY, W J Kerr-McGee Nuclear Corp 82/09/17 HENSCH, A 
Oklahoma, State of 7flp 197B6 329 



DOCKETED ITEMS 



8210370242 Forwards application for renewal of License SUB-C010 
Reneu-a I fee encl 

SHELLEY, W J Kerr-McOee Corp- 83/09/2-1 PAGE. R Uranium Fuel 
Licensing Branch 3pc- 15S*9 175 

8210270247 Application, for renewal of License SUB-1010 to refine U 
from yellcucake. to convert U to pure U ne rafluor I de 
TMT tij-five averain drawings encl Aperture cards available 
in PBR 
SHELLEY,W J Kerr-cSee Corp B2/09/S4 320pp 15849 17B 



DCCKET 40-8034 fi|O ALGGM COHP , MDAB. UT 



-B2IQ3200eO Source Matl License SUA-1106 for Kennecott Copper Col p 
author-inns possession of 2,000 kg U 
HALARO-JC Atomic Energy Commission 71/12/15 Ip 15786 3'>U 

-S2IQ2200B6 Application for amend to License SUA-1106 licensing plont 
far storage only, of refined product 

SFEDDEN. H R Kennecott Copper Corp 73/11/12 MALARO, J C 
Atomic Energy Commission 2fp 15786 339 

-6210320089 Certificate of disposition of ma 1 1 s mat I disposed in 
compl lanca U/10CFR20 

* Office of Nuclear Material Safety ! Sa f eguards, Dl rec tor 
76/12/17 Ip 157B6 2iO 



B2I0210515 Revieui tuio const rept* For IS-ft embankment raise In 
Rio- Algoro Corp louer tailings dam performe-d by Dames 6 Moore 
4 fleoion 4 No further action required b-g licensee 

HOC-LSEY.R T , PETTENQILL, H J Uranium Race-very Licensing Branch 
83/09/30 Uranium Recovery Licensing Drancft 4pp 15792 3O7 



-0310230092 Confirms recent telcans re unrestricted use of ^cility 
Radiation survey* to be performed !, results sent to NUC 
CARR1CO, J B Licensing Management Branch 92/04/01 FQLSdK, B 
KennBtott Copper Corp 15pp 157B6 2il 



DOCKET 10-6102 EXXON CD USA, BOjaTON. TX 



aSIO2701?5 Forwards "Environ Mon i torlng Data for Second Quarter, 1 
puriu-ant to License Conrfition 36, inr I udlng ctase evaluation 
at nearest recidence * results of environ monitoring 

prop.""* 

VARNICKi T P Enon Nuclear Co i tnc (iUlis of Ei i-on Corp 1 
82/09/0? PETTFMQILLiH J Uranljm fl*cotferv Licensing Branch 
15635 34? 

92103701-97 "Environ Monitoring Data lor Second Quarter. 1 1P2 " 
Enon Muc]dr Co Inc fsutis of Euan Corp } B 3/09/02 
Hpp 15B3S 350 



DOCKET 40-9153 LEBANON STEEL FOUNDRV. LEBANON. PA 



92I037Q37O Application For reneua 1 of Source Matl License SUO-I H 
authorliing possession of 5i kg 1/-235. enric h8iJ to [ess than 
4X. f or USB in area radiation sys 
ARNDLD.M L Lebanon Steel Foundry B2/09/33 Spp 15835 001 



DOCKET 10-Q3S5 AMAX SPECIALITY METALS CORP , PARHERriQURO, W^ 

62052'100t)3 Forwards EIA of proposed site stab it nation at AMAX, Inc 
Nl/QU.W A Cranium Fuel Licensing Branch 82/03/05 KERRIGAN, J 
AMAX. Inc Ip 15&E2 023 



B31-02605S7 Forwards fuaunAru. of airborne emissions at principal 
radionucli-des (. "Sejniatinua 1 ALARA Rept, Jan- Juno 19B3. '' 
pursuant to License Conditions I'l 6 35 No liquid effluents 
discharged to unrestricted areas 

YARWICtt, T P Eiion Nuclaar Co , Inc Club! of Eitcm Corp ) 
Ba/0?/03 Uranium Becovery Licencing Ora nc h 3pp 15030 360 

9210260560 "Semiannual ALARA Re pt. Jan-June 19B2 " 

* Ei ion Nuclear Co , Inc (subs of Enon Corji Y 02/09/03 
7Spp 1SS30 263 

&31QISQ531 Adviis that Euan general emergency attioti p lans, Bubmittud 
iu/a20S26 Itr.ar. ac ceptao 1 H Cond i tian II to License BUA-1 13 1 ? 
should be amended at Hated 

JQNE9.S 2 : PETTWOILI..H J Uranium Recovery Licensing Branch 
&2/O9/23 Uranium Flacovenj Uicenalng Branch Spp 15fa73 2O4 

eaiOI20598 Natl fiei of Issuance of Amend 3 to License 5UA-I I3 1 ?, rovisinq 
Licinie Condition 25 re emergency prejiareiln esc 

SKITH.R D Uranium discovery Licensing Branch 02/09/23 EIIOI> 

Corp Ip I9&72 350 

GS10130432 Advlte* thdt no addl Pees FOT revi ui of applicitior For 
Aminif 2 to License BUA-1139 required 

HILLEfipW Llceni Fee Management Branch B3/1O/07 
01LCHRIBT, J E Euan Carp Ip 15713 331 



DOCKET 40-B1I1 KENNECDTT COPPEfl CORP , SALT LAKE CITY, UT 

82lOEaOOii Advist* that NRC cloaad out licani* file* uhn UCDCISB 
eipirid in 1776 u/o claieout survey Facility me-ots NRC 
criteria for unreatr l ctd ut* 

CARRJCfliJ B Ltcenilng Manaaoment Branch H3/1O/01 FOLBOH.B 
KennernH- f"- " ' 



-8205240010 Negative declaration re storage of contaminated soil un 
1 1 cense; 

PAOE.R G Uranium Fuel Licensing Branch 03/05/03 4pp 
IS6I2 O23 



fl2053400Oi EIA supporting proposed site stao 1 1 1 lat ion 

* Offict of Nuclear Material Safety ! Sa f eguards. Direc tor 
52/04/30 ?0op 15612 025 



DOCKEf 4O-B3BO ROCKY MDUNrAIH ENERGY CO , BRO.O.MFIELD. CO 



S210I80378 Forwards "Orounduiater Restoration Ropt for fiocky Mountain 
Energy-HalliAurtan-Hono power Nine Mile Lai B R&D In Situ 
U Project " 

NEUMANN, M fi Rockv Mountain Energy Co 92/OS/30 NEUMANN, M H 
Uranium Recovery Licensing Branch ACKERMAN, U , GARLAND. U Ui|omn 
State of 3ff 1S747 001 

B21Q1B04O5 "Orounduater Restoration Kept for Rocki/ Mountain Eneray 
Halllburton-Hono Pouer Nine Mile La*r RID In Situ U 
Project " On* ove-riue map a ncl Aperture card is available 
in POfl 
. Rocfcy Mountain Energy Co B3/06/31 2I6pp 15747 004 



DOCKET 40-S4Sa BEAR CREEK URANIUM CO , CASPER, WY 



S210150644 foruards gradation resulti for Zone III sandstone in 
tailings disposal area. In response to B20BQ& Itr Gradation 
ttiti f-or Zont IV c layitone alio submitted 

HEDLOCK, R L Bear Cre* Uranium Co BS/OB/20 BCARANO. R A 
PETTENOILLiH J Uranium Recovery Licensing Branch !3pp 
19715 212 



921oaoi0084 Forwards Self-Bond BCU399-01 to Permit 399 for Bear Cruet 
U Co 

BRVAH.v J Hyeningi State of 82/OB/SO FLDRV,C Uranium Recavi 
Licensing Branch 4pp 1BB14 149 

a2IOSS044A ForonrJs self-bond indemnity agreement to Permit 399 for 
Bear Creek U Kill betueen State of MY Dept of Environ 
Quality * Union Pacific Corp Vendor agreed to indemnify any 
liability Incurred by Bear Creek 

BRYAW. V. J Wvoming. Stat* of B 2/08/30 FLORY, C Uranium Rocavc 
Licensing Brnch Spp 15898 350 



9210120634 ftevi *ui fiTit quarter tfBS environ monitoring data I- do an 
calculations fop Baar Creek U Hill Licensa Conditions 17,49 
1 54 latltfjad. 

FLOHY.C. A , PETTENOILL.H J Uranium Recovery Licensing Branch 
82/07/20. Uranium Recovery Licensing Branch 3fy 15672 273 



tu 1 1 tM5> 



DOCKET 10-5503 WYOMING MINERAL CORP . LAKDJaOD. CO 



B.,10270160 Forwards "Irigaraij Mine &i te. Semiannual Activity fc 
Monitoring RB pt, Jan-June. 1983 " 

COh^OV, D W Wyoming Mineral Corp B2/09/25 Region 4, Office of 

Director 2p a 1 5B35 332 



8210270227 Application for amend to License EUC-I3SO to (ill aid 
staballoy to be used in terchangeab I in/depleted U when 
referring to U allays 

SMITH. L E Army,Dept of, Headquarters Materiel Deve lopmen t I> 
Readiness Command 62/O8/20 Dlvinon of Fuel Cycle t. Material 

Safety 2p p 1 SS36 Q44 



83102701B3 "Irigaraij Mine Si te. Semiannual Activity & Monitoring Hept, 
Jan-June. 1982 " 
* looming Mineral Corp B2/OB/25 I4pp 15Q35 334 

B21004033S Discusses aitinon i a-ni trato relationships applied tn 
groundwater restoration at WV Mineral Corp Ingaray U 
Solution Mining Project in FES '/ responses to comments on 
DCS 

LOGSDON.M J , LINEMAN. J J Uranium Recovery Licensing Branch 
B2/09/07 Uranium RecoveMj Licensing Branch 3pp 15597 102 



DQ-KEF 40-8577 AIR FORCE, DEPf OF. VANDENBERG AFD, CA 



621027017'' Forwards application for amend to License BUB-12B9, 
reflecting changes in Western Space *, Missile Ccr radiation 
protection committee ! use of TLD Instead of film badges 
I1DLL1IIGER.L J Air Force, Dept of, Radioisotope Committee 82/09/14 
Division or Fuel Cycle & Material Safety 4pp 15333 023 

210270182 Application for amend to License SUB-12S9, refl ect I ng 
changes in Western Space >' Missile Ctr radiation protection 
committee Personnel resumes encl 

I1EIN7.E L Air Force, Dept of, Hadioisotope CammitteB B2/09/14 
J3op 15B35 027 



DOCKET 40-0691 EfJEROV FUELS NUCLEAR, INC , DENVER. CO 



9310220516 Submits questions re Amend H. Condition IS to License 
5UA-I35B Rewording of composition of internal audit 
committee suggested to alloui for reorgani la tion 

BAKER.C E Energy Fuels Nuclear, [nc B2/OB/2Q OILLEN. D Uranium 
Recovery Licensing Branch 2pp I 37Q6 036 

8210250034 Application for amend to License SUA-1359, revi sing 
representation on inteinal audit committee Si recipient of 
semiannual ALARA audits 

BAKER, C E Energy Fuels Nuclear, InC B3/08/30 OILLEN, D Uranium 
Recovery Licensing Branch 3pp I 500B 347 

8210250006 Foruards "Effluent t, Monitoring Rept, Apr-June 1982 " 

BAKER, C E Energy Fuels Nuclear, Inc B2/OB/27 01LLEN, D Uranium 
Recovery Licensing Branch lp 15BOB 133 

S21025000S "Effluent t Monitoring Rep t, Apr-June 1982 " 

Energy Fuels Nuclear, Inc B2/08/27 45pp 15SOB 136 

B2102S0017 Forwards "Semiannual ALARA Audit Rept for Energy Fuels 
Nuclear. Inc Whit* Mesa U Ml 11 , D land Ing, UT " 

BAUER, C G Energy Fuels Nuclear, Inc 32/08/31 vINCELETTE,M D 
Energy Fuels Nuclear, Inc lp 15914 303 



DUCKET 40-8602 SILVER KING MINES. INC , CASPER, HV 



621G350Q54 Forwards "Preoperationa 1 Radiological Environ Monitoring 
Wept, Jan-June 1982 " 

WCLFF.C E Silver King Mining, Inc B2/OB/27 SCARANO, R A 
Uranium Recovery Licensing Branch 3pp 1 580S 016 

--S2103SQOS& "Prcopcrationa 1 Radiologltal Environ Monitoring Rept, 
Jan-June, 1982 " 
' Sliver King Mining, Inc 82/OB/27 107pp 1 5BOB 019 

321O27C040 Forwards three warranty doerfs per BSOBIO telcon All deeds to 
be assigned to Silver King Mine, Inc as trustee For TVA Deeds 
fu] f 1 1 1 lano ouinenhip requirements 

WOLFF, C E Silver King Mining, Inc 03/03/20 PANTELL, S Bivlsion 
of Fuel Cycle ', Material S^fcti; 1 6p p 15B36 09f> 



--B310S6001B "Simiannual ALARA Audit Rept for Energy Fuels Nuclear, Inc 
WhitB Msa U Mill.nianiflng.ur " 
* Energy Fuels Nuclear, Inc B2/OB/31 llpp 15BH 306 

B210260022 Application for amend to License SUA-13SS, author! ' i"3 
ducharge of tjilingu into Cell 3 prior to completion of 
conlt of Cell 4 safety dike Progressive const of safety dike 
mill contain vol of potential spill 

BAKER, C E Energy Fuels NucUar, Inc S2/09/02 OILLEN, Uranium 
Recovery Licensing Branch Gpp I5B1431B 

8210270209 Advises that schedule for initiation of const on Cell 3 
safety dike at White Mesa mill be delayed [ wk beyond date 
set forth in B2040B Itr Completion of safety dike may be 
delayed until Spring 1933 

DAKER.C E Energy Fuels Nuclear, Inc B2/09/03 OILLEN, D Uranium 
Recovery Licensing Branch lp 1 3636 034 



BOCXET 10-8610 STEFAN CHEMICAL CD , HrtYUODD. NJ 



210260341 Forwards QA Program Insp Rept 99990001/03-13 on 020923 
No nonconp I lance noted 

KTNtJEMAN.J D Region 1. Office of Director, 02/10/32 FIORE,R A 
Mayuiood, NJ FIORE.R A Flore (. Jaskot 2pp 1BB03 033 

-83102603^5 QA Program Insp Rept 99990001/82-13 on B20923 Nn 
nonconp 1 lance noted Major areai inspected measurement of 
radiation levels 1 gathering of sediment samples in & along 
Coles Brook , Mayiuaod, NJ 

JQHANEEN, J , KINNEMAN.J D Region 1, Office of Director 
O2/10/31 6pp 15SO3 035 

-62-10260352 naquests info on whether proposed stream clearance project 
would create haiard re ladluactive contamination in vicinity 
of broofr Sketches encl 

FIBRE,!) A Mayuood. NJ FIORE, R A Finre & Jasfcot 82/09/14 
KINflEMAH.J D Region 1, Office of Director CQSOLITO.F Neiu 
Jertey. State of 4PP 10003 041 



DOCKET 40-9633 ARMY, DEPT QF, CHAMDERSBURO, PA 



3310270223 Foruarifs application to amend License 9UC-13BO to allow 
staballoy to be used interchangeably u/dpleted U uhen 
referring to U alloys 

TARAB, D K ArmU'Dept of, Headquarters Materiel Development & 
Readiness Command 82/OS/27 Division of Fuel Cycle & Material 

Safety lp 1 BB36 O43 



S31027Q'133 Forwards "Tailings Cover Duslgn Revision" In response to 
NRC B208I2 request for info re application for amend to 
Llcinse BUA-I35B Proposnd reduction in thickness of tailings 
reclamation cover adequate 

BAKER, C E Energy Fuels Nuclear, Inc B3/09/03 OILLEN, D Uranium 
Recovery Licensing Branth lp 15833 001 



8210370439 "Tailing* Cover Design Revision 
i D'Appolonla Consulting Engineersi Inc 
19833 003 



S2/OS/2S SSpp 



82100-10363 Notification of 920913 meeting in/Energy Fuels Nuclear in 
Silver Spring, MD to dlicusi Hh(t Met* Facility reclamation 
p Ian, asioc iated cottt Ii proposed surety arrangements 
OILLEN. M Uranium Recovery Licensing Branch 92/O9/0? 
L!NHAW, J J , PETTENCILL.H J , FLEHINO, T, E NHC - No Detailed 
Affiliation Oivtn 2pp 13597 191 

B310120641 Recofnmenifs no action be taken on licensee request For 
hearing on license .amend to require surety For 
decommi islonl ng & reclamation issue may be mooted bu 
licensee submitti! of revised reclamation plan 
LI NEMAN, J J Uranium Recovery Licensing Branch 82/09/17 
KLUC8IK.J F Office of the Oen*r*l Counsel lp 19672 27B 

9210810532 Issuei Amend 15 to Licenn SUA-1350. in response to B209Q2 
request Amend adds Itttn g to License Condition 24 allowing 
licensee to forego const of Cell 3 safety diki 

StllTHrfi D Uranium Recovery Licensing Branch 02/09/30 Energy 

Fu.lt Nucllar, Inc lp 15762 329 

B2 1 02 10534 Recommends issuance of Amend 1 15 to Licentt BUA-133Si in 
response to 330902 nquist Amend add* Item g to License 
Condition 26 allowing licensee to forepo const of Cell 3 
ufity dike 

OILLEN, D M Uranium Ricoverif Licensing Branch 02/10/04 
Uranium Recovery Licensing Branch 2pp 15783 326, 



DOCKETED ITEMS 



DOCKET 10-8-697 RflCKV MGUNTAIN ENEflQY CO , DENVER, CD 

83102B045I Advi,et that differences idtntlfied in tuo lab finding for 
potassium value! due to different la* procedures or lab 
capabilities Differences in pH value! dua to NML reporting 
field values 

SCHHITTDIEL, P Wyoming. State of B2/Q4/27 Wyoming. State of 

4pp 15353 34k 

8210250043 Forwards corncted rapt for radion ut 1 1 de eoruentrat i ons in 
Pattern 2 injection b production uells from D20401 
stabilliatfon jamples for. "Reno Creek Pattern S Restoration 
Rept Addendum " 

NEUMANN, M R Rocfcu Mountain Energy CD BS/0?/09 KALMAN. K 
Uranium Recovery Licensing Branch 2pp IS77S 348 

821Q040344 Discuiie* revieu af Itocku. Mountain Energy 19&2 second 
quarterly rept For Reno Creek Site No fol Louup actions 
necessary 

KALMAIMt L , LINEHAN.J J Uranium Recovery Licensing B r ancn 
Ba/09/HJ Uranium Recovery Licensing Branch 2pp 15597 IBS 



DOCKET 40-94.98 PLATEAU RESOURCES, LTD , GRAND JUNCTION, CO 



6310240577 Object! to conditions on comment a mint of mining in Unit 3 
Collection of baseline water quality data in Unit 3 prior to 
mining unnec essari; to insure environ protection of 
grounduater 

CATCHPOLE.Q J Ogle Petroleum, tnc 
State of 3-pp I5B30 139 



B3/Q9/02 FRANCIS, E Wyoming, 



8210120571 Req.ueitl that aacand aquifer pump test be performed prior tr 
licensing injiction of liilviant into Mining Unit 2 are lone 
to evaluate confining nature of lower claystone layer 
Previous teit Inadequate 

LINEHAN.J J Uranium Recovery Licensing Branch B2/09/1O dgle 

Petroleum. Inc Ip 15672 331 

B210120604 Respond! to request to analyie Hint Unit 2 pump test 
& associated data Uit af ratio method to determine vertical 
hydraulic conductivity of louor aquitard invalid 
HILLIAH3, R E HI 1 1 lami-Rob ine tte & Associates, Inc Q2/09/1O 
Mllliajii-Rubinttta (. Associate*, Inc 9p p 15J.7S 352 

82IOSS0046 Foruardi in-plant radon concentrations table for first half 
af 1983, pr NRC requflit 

SAUHDERB.O A Oglv Petroleum. Inc 62/09/10 SMITH. D Uranium 
Rtcnvirv Licensing Branch Ip 15B&3 004 



1210260019 Confirms 820030 c onvenat ion re temporary suipenslnn at 
production at Shoataring Canuon LI processing facility 
YeltDtiic-ike- In iya preientli) being racovered Plant ui II 
return* milling i mining bg late 19Q4 

OERDEMUN.F M Plateau RtourcBS. Ltd 63^03/34 FLEMING.! NRC - 
Ma Detailed Affiliation. Given Ip 15014 317 



00-0714 CLEVELAND-CLIFFS IROU CD . CLEVELflMD, DH 



J31 052051 S HotLfltg that Cleveland Cliffs surface ditchargi operation 
monitoring program comfllies u/re^uirHments of HPDES Permit 
WY-OQ307B3 No furthar action required 

PDHLE.J A . LIHEH/iM,J d Uranium Rocovtru Licensing Branch 
B2/06/03 Uranium Recovery Llcansin^ Dranch Ip 157H6 O69 

Jai022003ti ndvist that License SUA-13SH amended to roviue License 
Condition 10 r authortud use of eipdnded ion eichang>i 
reiin 

SCAHANO.fl A Uranium Recovery LieBnsin} Dranch B2/09/30 
LQUOERBACKi T E Cl ovaUnd-Cl if f s Iron Co 2pp 157B4 SB1. 



IOCKET 10-673S TETON EXPLORATEON DRILLIHO CO , INC , CASPEfl. MY 

1210230412 Forwards Stats of WV Dept of Environ Oualiti), Land 
Quality Dlv 92051? Itr accsptJnj groundwattr stahil t lat ion 
in H long flnul**r In advising of plugging op ione tuellc 
APPEU-R fi Teton E'ploration Driliinn Co , Inc sa/oa/23 
ROSSiF H Htc - Ma Detailed Affiliation Given Son J5B39 



--B2102Q0049 "Radon Oas Concentration in uCi/ml. " Jan-June 19B2 
4 Ogle Petroleum^ Inc B3/09/ 10 Ip 15BA3 005 



DOCKET 40-3769 KEHR-MCCEE NUCLEAR CORP , OKLAHOMA CITY, OK 



8210040:365 Diacusies review of Kerr-McGee Q-Sand Project quarterly rapt 
For Jan-Mar 1 932 To date.no serious events identified 
which necessitate change of operations or shutdown 
WE&TBRODK.K , LIHEH^N.J J Uranium ftecoveru Licensing Dranch 
B2/O9/07 Oranlirm Rncoverv Licensing Draneh 4pp 1 S597 193 



DOCKET 40-8771 MELAPAI RESOURCES CO , PHOENIX. 



621012053i Advisei that no violation found during NRC a SO 4 06-07 
in-operational safety imp 

FLETMtfJO.T E , MARTIN. D E Uranium Recovery Licensing Branch 
aa/Q9/H2 Uranium Recovery Licensing Dranch Ip 1 5673 216 



DUCKEF 4Q-B7B1 TGTON EXPLORATION DHIULINO CD , INC , CASPER, HY 



82IOS700fi6 Eipr*sin appreciation for Ofportunity to revieu (. comin 
on DES for Teton Eiploration Drilling Project Document 
adequate re compatibility ui/local & regional coraprnhons 1 v* 
planning 

MATUSCHECKrR J Housing ft Urban Deve lopment. Dept of B2/QG/OS 
SCAHANO. R A Uranium Recovery Licensing Dranch Ip 15Q36 197 



I2I01S0494 Aifvlm that prupond lh-plant radiation lafetij pi-Qoram 
acceptablt u/luted xceptions, Condi tion* 25 (> 30 af License 
BLTA-1373 shauld be rvvitad as itated 
SOLLGNDERGEH, D , PEITTENQILL, H J. Ur-anlum R.covBrv Licensing Iraneh 

RDBB.FW Uran 1 urn Recovery Licensing Branch pp 
nj.x, 



6210350032 Commenti on application procesi to dati Ule of environ refi 
for NRC pur-poin fimilar to State of WY format will save 
conilderab 1 * preparation time 

APPEL.R R United Nuclear Corp 02/08/23 SCARANO. R A Uranium 
fleCBVerij Licenilng Branch 3pp 19FJ03 349 

B210BiQQ94 Faruardi itate agency Commettts on project DEB Enc 1 
analyiai support issuance of combined source It byproduct 
matl license, sub j to specific licensing candlttani of other 
localiitate: It federal stdt tt regulations 

HER&CHLER.E Myomingr State of B3/OB/26 SCARANO, R A Uranium 
Ricovery Llcenting Branch 9pp 15510 330 

eai0260097 Catmint i on DES Sentence that mobile fire units ar 
maintained by Convene County Rural Flri Control Asioc 
should be added to Page 3-20 

LW4DELL.B.E Huomino, State of B2/07/19 Uranium Recoverij 

Licensing Branch IP 19B10 339 

821QiiaOfil9 Forwards safety evaluation supporting isiuanci of Licn*e 
SUA-1403 for commercial In itu leach U mine li recovery 
plant 

UUOLSEY, R.T , PETTENOILL. H J Uranium Recovery Licensing Branch 
B2/09/30 Uranium Recovery Licensing Branch Ip, 1S672 238 



831Qi:?OA24 Safty evaluation supporting issuance of License SUA-140 
for commercial In situ leach U min* !< recovery plant. 
MOOL8EY-F T , PETTENOILL, H J Uranium Retoveru Licenslno Branch 
83/09/20 25pp. 19673 '239 



DOCKETED ITEMS 



"10-0796 URANIUM RESOURCES, INC , RICHARDSON, TX 



O Advisory Committee on Reactor Safeguards reports & correspon donee 



G2lOlB035ii Forwards response to NRC 850723 Itr re ma 1 f unc ti oning flow 

PDB 

PCLIZZA.HS Uranium Resources, Inc 82/00/12 L INEHAN. J J 

Uraniun Recovery Licunsing Branch 3pp 1371)7 332 

E31fMB0359 'Pond Soil Analysis :l 

* Affiliation Unl-nown B2/O2/22 3pp 13747 337 

B2L0250QI3 "North Platte Project Quarterly Hep t. 8304 1 5-O7 15 " 
Uranium Resources. Inc 62/03/23 fcflpp 1 SBOB 183 

.8210130479 Approves licensee restoration of RJ-D wellfield using 
combination g roundua t er 5 weep t, reinjection of reverse 
osmosis treated water Nells will oe restored to propor 
levels at end of restoration 

WESTGROQK. M D . LINEHAN, J J Uranium Recovery Licensing Branch 
B2/O7/17 Uranium Recovery Licensing Branch 2pp 15672 O51 



DOCKET 10-9793 CONOCO, INC , DENVER. CO 



QS10D4034B Discusses CONOCO. Inc request for withdrawal of Ruby Ranch 
In Si'.u U Project application Option of withdrawing 
application granted 

VOUMG, V A . LINEHAN, J J Uranium Recovery Licensing Branch 
02/O9/10 Uranium Recovery Licensing Branch 4pp 15597 1H7 



4Q-B920 AHA* ENVIRONMENTAL SERVICES, INC , GOLDEN, CD 



E>;iQ25Q035 Advises that radioactive contaminated soil removed fraa 
adjacent property owned by Chiyoda Steel Corp Author! la (,1 on 
by Chiyoda to enter property ft remove soil encl 

KEPPLER.P AflAX, Inc 02/09/31 NIXON,W NRr - No Detailed 
Affiliation Give" 3pp 1 5308 349 



0307180077 Forwards comments on PRA tudy dealing u/seiamic haiard 
Validity of conclusions rest on quality of primary data 
bases !i assumption! in both studies Repts are not valid risk 
assessments due to data base limitations 

POMEROY. P H Flondout Associates POMEROY, P W ACHS - Advisory 
Committee on Reactor Safeguards 83/00/34 OKRENT, D ACRQ - 
Advisory Comnittee on Reactor Safeguards 7pp 1 5B76 001 24K 
Fiehe 50-003,82/08/24.0207100077 



P Operating license staga documents (. 



rres pond ence 



6009080466 Forwards response to 800820 request for status rept re 
Zion/Indian Point task action plan flesponsi b 1 11 1 1 es are in 
area of severe accident mitigation features 81 not in interim 
Operational actions portion 

MEYER, J F Reactor Systems Branch BO/OB/25 NOVAK, T H Assistant 
Director for Operating Reactors 2pp 034B4 009 24X 
Fichc SO-Q03. QO/O0/25. B0090B0466 

8010210036 Discusses SEP Branch review of sijs environ qualification 
of safety-related electrical equipment for 11 SEP plants 
MCKENNAi E M Systematic Evaluation Program Branch BO/07/30 
LAINAB.G C Division of Licensing 2pp 03647 209 24X 
Flche 50-003,80/09/30,0010310036 

8210120103 Addl response to FOIA request for nine categories of records 
generated by present NflC Commissi oner s. pr imarl ly Chairman 
Palladino li Commiss ianflr Roberts & Uhlte House Forwards 
App B documents 

FELTON,J M Division of Rules and Records B2/O7/12 UDELL. R A 
Critical Mass Energi, Project 3pp 15690 117 24X 
Fiche 50-000,82/07/12,0210120103 

92101201BB Notifies that facility ul 1 1 be d ecorammlssloned by uti 1 
rather than make ECCS mods to meet NHC criteria Utll 
proposed research funding cannot be provided Recommends 
approval of proposed Itr to utll 

ZECH.O NRC - No Detailed Affiliation Given B1/1I/OS 
ROBERTS, T M Commissioners lp 15690 160 24X 
Flche 30-000, B2/07/1S- B3IOI30103 



DDCKET 40-8924 TARGET RESEARCH, INC , WHAfJTDN, NJ 



8210370373 Forwards application for source mall license, authori I Ing 
nosiest] on of 6, OOO kg U a 1 loy, enr 1 ch ed to If BY. U-23B, for 
usa in assembling armor-p I en ing projectiles 

QAKUM.K E Target Research, Inc 82/O9/15 Division of Fual 

Cycle t, rlatsrial Safety Ip 15035 S20 

'-13310270370 Application for license to possess 6,000 kg depleted U 
alloy, enriched to 99 8X U-S38, f or use in assembling 
flrmor-pierc Ing projectiles 
GIWDAGNO.V Target Research, Inc H2/Q9/I4 17pp 1 5B35 3P1 



8210010401 Forwards application to amend Licenses DPR-26 & DPfl-5, 
changing Tech Specs re facility organiiatlon t Unit 2 
Tech Specs 3 6 & 4 4 r containment isolation valves 3 12 & 
4 12 in pipe line! Clasi I, II t, III fees encl 
O'TODLE.J D Consolidated Ediion Co of Neui York B3/OH/31 
VflROA. S A Operating Reactors Branch 1 3pp 15572 211 34X 
Flche 50-003, B3/OB/31. 0210010401 

B210010409 Application to amend Licenses DPR-26 & DPR-3, revis 1 ng Tech 
Spec Figures 3 3 6 6 3-2 re facility organiiation far 
Units 1 !< a, res(iec tivoty 

O'TOOLG.J D Consolidated Edison Co of New York 82/08/31 Hpp 
13372 211 24X Flche 50-003,82/08/31,0210010401 



DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES 

DOCKET 50-3 INDIAN POINT STATION. UNIT I 

F Security, medical, emergency & fire protection plans 



-B210Q10414 Proposed revisions to Tech Spec Figures 3 a & 6 2-2, 
rvflicting change in organliational structure to include 
position of operation) superintendent Safety assessment 
encl 

* Consolidated Edison Co of Neu York 03/08/31 6pp 
19973 216 24X Fiche 50-003,03/08/31,3210010401 



9210280148 Releases public version of revised emergency plan 
imp 1 iment ing procedures 

TELTON, J M Division of Rules and Records 02/1O/13 Document 

Management Branch Ip 1 5B62 371 24X Fiche 50-003.83/10/12, 
B21O28014B 

B2IOS90154 Forwards public version of revisions to Emergency Plan 
Implementing procedures IP-1030 re airborne radioiodine 
determination i IP-1046 re utll personnel responsibilities 
during Unit 3 emergencies 

Q'TOaLE,J D Consolidated Edison Co of Neiu York B2/1O/01 
H/.YNES.R C fiagipn 1, Office of Director 3pp 13862 372 24X 
Fiche 50-003,82/10/12,8210380118 



-8210010435 Application to amend License DPR-26i revising Tech Specs 
3 6 & 4 4 t o establish requirements for action required when 
containment isolation valves are Inoperable & reflect 
changes to isolation valve provisions 

O'TOOLE, J D Consolidated Edison Co of Hew York 62/08/31 Bpo 
15973 222 24K Fiche 30-003, B2/OB/31, 02 1O010401 

-8210010438 Proposed revisions to Tech Specs 3 6 b 4 4, estab 1 1 sli ing 
specific requirements for action during inonerabi li ty of 
containment Isolation valves & reflecting changes It add i tons 
to Isolation valve provision! Safety assessment Encl 
* Consolidated Edison Co of Neu York B2/OB/31 20pp 
1B37S 224 24X Fiche 50-003.83/08/31,8310010401 



8210580159 Public version of revisions to Emergency Plan Implementing 
Procedures IP-(020 re airborne radioiodlne determination < 
IP-1046 re utll personnel responsibilities during Unit 3 
emergent! es 

* Consolidated Edison Co of Neui York 82/O9/OI 16pp 
1B862 275 24X Fiche 30-003, B3/10/ 12. 831028014B 



-B210010443 Application to amend License DPR-26, revi s inn Tech Spec 
Sections 3 13 & 4 13 to defflect editorial change 
safety-related pipe lines Si to efflsct editorial change 
O'TOOLErJ D Consolidated Edison Co of Neui York 83/08/31 3pp 
15573 344 24X Flchi 30-003,02/03/31,8210010401 

-8310010449 Proposed revisions to Tech Spec Sections 3 13 tt 4 12j 
reflecting redesigned support sus for lif ety-related pipa 
lines i. to efftct editorial change Safety assessment end. 
* Consolidated Edison Co of hteui York 02/08/31 IBpp 
1SS72 246 24X Fichs 50-003, B3/OB/31 , SSI 0010401 



DOCKETED ITEMS 



Inspection reports- IE Bulletins 



IE info flat.ce 80-35. Suppl 1. "Liking S. Dulodged 1-125 

'Dwision ofVueT Facilities. Materials fc Safeguards 

cinioI.S.t.d EdMon Cc of N.u Vor k 6pp .5761 S5 
24 < Fich. 50- 000. E)a/l 0/04,6303190333 

IE Bulletin B3-03, "Streis Corrosion Cracking in Th>cl- 
arje-Dianf tar. Stainless Steel. Rec irculation B-js 
Pipino at OUR Plants " Sve Hit encl 

DEYCUrjO.n C Director'* Office, Office of Inspection and 
Enforcer-enl B2/1O/I4 Consolidated Ednon Co of Neu Vor t 

I33pp IS310 IS5 24X F.cAe 50-000. S2/10/ 14. B30B11023B 



DOCKET 50-10 DRESDEN NUCLEAR POWER STATION, UNIT I 

F Security, medical, emrjenc<J t, fire protection plans 



Fteledsex public version of reviled generating station 

snerjeiKY plan corporate cnmnand ctr emergency plan 
Lipplefn'n t ing procedure 

FFt-TOW.J M Division of Rules and Hecords 33/09/16 Document 

HaniSBflient Branch Ip 15564 122 24K Fi che 90-000. B2/09/li, 



P Operating license stage documenta 6 correspondence 

9210240526 Forward* Revision 3 of Chapter of "Offsite Dose 

GuLDE/J^'c" 1 "co^on^ealth Edison Co B2/10/G6 CASE, E e afrit, of 
Nuclear Reactor Reoulatmn. D.rector 2pp 15B05 137 24X 
Fiche 50-000,82/10/06,8210260526 

BJI0360542 Revision 3 of Chapter 9 of "Offsite Hose Calculation 

/"comonuealth Edison Co 82/09/30 B3 P p 1 5B05 139 2<1X 
Fiche 50-000,82/10/06,8210360526 

8310130326 Comment* on prnposed .tape of Phase 111 of SEP as reflected 
in individual topic definition* appended to B30909 ] tr 
Staff encouraged to develop t, implement mean*, to incorporate 
positive attributes of Phase III in licensee/NRC interface 
HACICH.R M SEP Owners Group KACICH.R M Northeast Nuclear Cnerj<| 
Co (suds of Northeast Utilities! 83/10/07 EIBENHUT, D 
Division of Licensing 7pp 15682 179 24X Tiche SO-OOO, OB/10/07, 
B210I 30326 

B2I01B0196 Forward! "Final Status Rapt in Proparat i on for Chemital 
Cleanino of Dresden 1, " Sept 1903 

RAUSCH. T J CommonoiBfllth Edison Co B3/10/I2 E1SENHUT.D 
Division of Licensing IP 15749 135 24X Ficfi* 50-010. BS/ HI/IP. 
B2101B0196 



B20 1 !2 C JOIB9 Forusrils public version of Revision A to generating station 
BnerijBncu plJn corporate command ctr Emergency Plan 
Ifiplementin0 Procedure EOF-3. "Environ/Ernei-jencY 
Coordinator " Receipt form end 



PrtJOlJSKt.J E Conmonwealth Edison Co 62/09/01 DENTCN. H R 
- Nn Detailed Affiliation Owen Ip 15564 133 24X 
Fichn 50-000. 92/O9/16. 6209290125 



NRC 



-0209290225 Public version of Revision 4 to generating station 
(ffergsnc,/ Plan corporate command ctr emergency plan 
Implement in 9 Procedure EDF-3, "Envi ran/Emergency 
Coordinator " 

PAJOUSKI.J E . UTEHSRt.L A . FLESSNEFI. S A Commonwealth Edison 
Co B3/OB/3I llpp 15564 124 24X Fiche 50-000.82/09/16. 



6210130376 Aivi-sei that installation of offsite dose calculation SIJB 
program fully operational tracking model t operational 
A-model uill be dala.j*iJ until B21231 to enmplete prim* 
cociputilr instillation 

SWAflTZ.ED Comraonusalth Edison Co 32/10/06 DGHION, M R Office 
of Nuclear Reactor Regulation. Director 2pp 156B2 093 24X 
Fichs SO-aaO.es/10/06.Q2l0130376 

S310E9QQ47 Retejjes public version of revision! to Quad Cities, Zion 
it Dresdan emsrgency plsi anreBi 6 revised genrafcui[ 
station emergncij plan be 1-ephgne dirertopy 

PEL TON, J M Division of Rules and Records 02/10^08 Document 

Management Branch Ip 15877 313 24K Fichs 50-000,62/10/03. 

3210270047 

8210290060 Foruiirdi public version of Revision 3 to Quad Cities t Zton 
inergentu. plan anncies. Revision S to Dresden tmergincg plan 
anriBi. Ravn ion to Byron emergency plan annei 4. revised 
jennratina ttation ninargtncij plan telephone directory 
MOORE, R D Common wealth Edison Co 83/07/30 DEMTON, H R NRC - 
Na D* tilled Affiliation Qiven 5pp 13977314 24 X 
Flth* 50-OOO.B2/10/OB.B310290047 

8310E95077 Put-He version of Revision 3 to Quad Clkiei t Zion 

emergency plan jmneies. Revision 2 to Dresden emerjencu plan 
antii L Rcvlcion O to B^ron Bmersencg plan annti 
Conmonuealtli Edison Co B2/06/30 103pp 3877319 24X 
FUlie 30-000.95/10/05,8210290047 

B2102900BB PubUc version gf revised generating station inergency plan 

teliphan* dirvctory 

CAU.E.D P COAnonuealth Edison Co 82/08/12 43pp 13B7B SIB 

24X Fich* 50-000, B2/1O/ OB. 631039004 7 

aai02E035a Providei info rt organitatlon I performance of depts 
niponlible For r*dlatiaa protection activl til*, p er 830702 
commitment Training coordinator anignid in Apr 1903 to 
Improve health phytlci training programs 

TflAHU, T R Comrnanwtalth Eriison Co 82/10/14 DENTOH, H R Office 
at Muclear Reactor R*gvl*lion, Dinctor 9pp 15776 2B7 24 V 
Fiche SO-000, B=/10/14.9210a2035B 

8SlOBS6l70 Aitvitti that plant t pr>p*redne> far offtte protection 
near feclUtu. e4eo,uate t will fee applied in event of 
radiological iarjencif IL Btite t local plant approved tubj 
to verification of jdi^mcy of alerting & notification njj 
THOMAS. L, M Faderal Erjticif Hanaaenent Agencg B2/10/14 
&lftCKS. M J Office of tn Eietutiv* Director for Operations It 
tS7Bq:aSS 94X Flche 50-010,aa/IO/M. B2102S0170 



B2101BOI9 1 ? "Final Status Rept in Preparation for Chemical Cte.imng 

Dresden 1." Sept 1901 Aperture cards avjilatile in PPFi 

. Dow Chemical Co DNB-D1-034 Bl/09/30 SBSpp 15719 ltd 

24X Fiche 50-010. B2/1O/ 12, B2101BO196 

Inspection reports. IE Bulletins t/ correspondence 

S210060329 Foruards IE Insp Repts 50-010/B2-02. 50-237/02-03 t 
50-249/B2-O3 on 830119-0^18 Wo noncnmp 1 lane e noted 
LITTLE, W S Division of Engineering t Technical Programs OH/07/2 

REED, C Commonwealth Edison Co 2pp 15615 331 2<1X 
Fiche 50-010,82/09/22,8210060329 

B210060335 IE lusp Kepts 30-010/82-02. 50-217/B2-OD d 90-249/03-01 o 

820119-02IB Na noncomp 1 lance noted Major areas inspected 

open (. unreiolved items i items of noncomp 1 lance ru 

integrated leal rate test 

REIMAHM.F W Region 3, Office of Director JrtCKIH, I N Divliio 

of Engineering t. Technical Programs 32/07/21 7pp ES&lit 'J1,t 

24X F^c^B 50-010. 82/09/22, B3I0060329 

B210150523 Poruards IE Insp Repts BO-OIO/R2-1 3, SO-237/B3-I7 J 
30-249/82-1B on 820700-0909 tt notice of violation 

STREETER.JF Dlviiion of Project fc Oesirfent Programs B2/OW2H 
REED.C Commonwealth Edllon Co 2pp 13713 099 24K 
Fiche 80-010, 82/09/2B. B21OI50S23 



B210I50530 Notice of violation from insf on 82070E3-OQ09 
STREETEft.J F Division of Project & Resident Programs 
Ip 15713 101 24X Fiche 50-010. B2/09/2B. 8310150933 



B3101S0538 IE Imp Repts 50-010/83-13,50-237/63-17 t. 90-249/82-1(1 01 

62070B-OB09 Noncorap 1 lance noted failure to IISUB (, perform 

air pressure test procedure 

TON-SUE.! M , JOflDrtN.M J . WALKER, R Division of Project It 

Resident Programs BS/O9/2B Bpp 15713 1O2 24X 

Fiche 50-010, B2/09/2B, 92101S0523 

8210150539 Foruardi IE Insp Repts 50-010/92-15,50-337/82-19 fc 
50-249/B2-20 on BiOB30-0903 No noncompl lance noted 
PAPESIELLO.C J Division of Emergency Preparedness t Operational 
Support 8S/10/OI REED.C, Commonuealth Edijon Co Bpp 
15714 179 24X Fiche 50-010,82/10/01,8210150339 

B210150543 IE Insp Hepts 50-010/82-15, 50-237/B2-19- k 30-249/83-80 Di 

B30830-0903 1 09 No noncompl i ance notid Major area* 
Inspected conf irmalorii measurements programi QC program for 
analytical measurements t> environ monitoring program 
SCHUMACHER, M C , NICHOLSON, H A . JANU6KA, A fi Division of 
Emergency Preparedness d Operational Support 82/09/30 7po 
15714 177 24X Fiche 50-010, B2/1O/01 ,B31O150S39 

820B190233 IE Info Notice 80-38, Suppl 1, "Leaking S, 01. lodged 1-123 
Implant Seeds " Svc lilt encl 

SSiiiftl DI * UU " ;*/<! FHlti. Materials * aaf.gu*rd 

2?i 2i ^ . Con lll " lat '"i EiHion Co of Neu York 6ipp 157A1 290 

H4X Fiehe 50-000,02/10/06.8206190233 fV 



DOCKETED ITEMS 



S20SI9023B IE Bulletin B3-Q3. "Stress Corrosion Grading in Thick- 
Ual 1. Large-Diametiir, Stainless Steel p Rec Ircu lation Eys 
Piping at DWH Plants " Svc list end 

OEYQUNG,R C Director's Office. Office of Inspection and 
Enforcement 82/10/14 Consolidated Edison Co of Neui Vorlr 

123pp 1SB1O 125 34 X Fiche 50-QOO. B3/10/ 14. 8200190230 



R Periodic operating reports t related corre spondenc 



B3I018Q077 Forward! monthly operating repts for Sept 1992 

SCOTT.D J Commonwealth Edison Co 82/IO/01 Director's 

Office of Inspection and Enforcement Ip 15719 001 34 X 
Fiche 30-010,62/10/01.8210100077 



R Periodic operating reports b related corresppndenc 



6310130420 Forwards "Annual Insp of Retired Heitinghouse Testing 
Reactor per License TR-2 for 1133 " 

NARDIiA J Westlnghouse Electric Corp 62/07/30 Standard llation 

J, Special Projects Branch Ip 15690 264 24 X 
Fiche 50-032, 82/09/30.8210130430 

821013042o "Annual Insp of Retired Us*tinghoue Testing Reactor per 
License TR-2 fnr 1903 " 

* Weitinghouse Electric Corp 82/09/16 3pp 15650 263 S4X 
Fiche 50-OS2, 82/09/30, 821013Q42O 



Monthly operating repts for Sept 19B2 
SCHRQEDeR.H A Coinnonuea 1 th Edison Co 62/10/O1 23pp 
15718 002 24X Fiche 50-01O, B2/1O/QI , 821OI00097 



DOCKET 50-27 WASHINGTON STATE UNW RESEARCH REACTOR 
Q Intpection reports, IE Bulletins & correspondence 



DOCKET 50-13 HADCQCK l> HILCDX CD CRITICAL FACILITY 

F Security, medical, energency *t fire protection plans 



0210190632 Forwards IE Insp Rept 50-027/02-02 on 830714-16 i 0010 
noncomp 1 lane* noted 

DOQKiH E Division of Radiological Safety i- Safeguards Program 
02/10/01 WILBON.W Washington, l/niv of 3pp 15740 029 
Fiche 50-027, S2/10/01,B210l90ci32 



3210210194 Forwards IE Safeguards In*P Repts 5O-013/02-O3 t, 
70-OB24/82-IO on S2O<!3D-tOOl No noficomp 1 lance noted 
G1DSON, A F Division of Engineering & Technical Programs B2/10/I5 

ElfGELDER.T C Babcock t Wilco. Co 2pp 13765 304 24X 
FichB 50-013.82/10/15,8210210194 

--6^10310206 IE Safeguards Insp Repts 30-013/82-O3 b 70-0824/92-10 on 
820130-1001 No noncomp 1 lance noted Major areas inspected 
physical protection of lou enriched SMI Details withheld 
<ref 10CFH2 790) 

GGODE.n . MCCU1RE.D I) Division of Engineevina t. Technical 
Programs B2/1O/15 Ip IS76S 3O6 SIX FichB 50-013,82/10/19, 
S210210194 



--8310190636 IE Imp Rept 50-027/Q2-02 on 820714-16 (. 0810 Mo 
noncompl lane e noted Major areas Inspected radiation control 
programj Inc ludlng posting & libeling. personnel monitoring. 
Instrument calibr Si effluent monitoring 

GARCIA, E N , HENSLAWSHI.F A, . BOOK. H E Divifl ion of Radio! ogl cal 
Safety t> Safeguards Program 82/09/30 6pp 15740 027 24X 
Fiche BO-027, 82/10/01, 0210190632 



DOCKET 50-29 YANKEE-ROHE NUCLEAR POWER STATION 

F Security, madicali emergency d Fire protection plans 



P Operating license stage documents !* corrospondonce 



aaiPO-10?14 DebaiU evaluation of discrepancy between electronically 
simulated reactor d channel periods revealed in calibr test 
performed on Log-N-2 channel No unsafe condition eiisted & 
n.o Tech Spec violation occurred 

OLSE1V.A F Consolidation Coal Co 82/07/27 Standard 1 iat ion & 

Spatial Projects Branch 3pp 19583 120 21 X Fiche 9O-013. 
02/09/27, 8210040214 



Inspection reports, IE Bulletins b correspondence 



6210060034 Forward* IE Safeguards Insp Rept 50-029/62-09 on 020803-05 
No noniomp 1 ianct noted 
HARTf N, T T Division of Engineering * Technical Programs 82/09/27 

HEIDER.L H Yankee Atomic Electric Co 2pp 15615 031 24X 
Fiche 50-029,83/09/37,8310060034 

6210060049 IE Safeguards Insp Rept 50-029/02-09 on 020802-09 No 
noncomp I ianct noted Major areai Inspected testing b maint 
records, phy steal barriers in protected & vltJl areas & 
security syi pouier supply Details withheld tref 10CFH73 21) 
DUNLAP,J,H, , SMITH.O C , CODY, A T Diviiian of Engineering t. 
Technical Pronrams 82/09/33 Ip 15613 OS3 24X 
Fiche 50-027,82/09/9718210060034 



aasO2I01<?4 Forunrds IE Safeguards Insp Repta 50-013/B2-03 t 
70-OB24/B2-10 on 820730-1001 No noncomp 1 lance notsd, 
GIOSON.A F Division of Engineering fr Technical Programs SS/10/19 

Ef,'GELDCR,T C Babcock b Uilco. Co 2pp 1576S 304 24X 
Fiche 50-013. 92/10/15,0210310194 

9210310206 IE Safeguards Insp Repts 50-013/82-03 b 70-0024/82-10 on 
&Z0930-I001 No noncomp 1 lane* noted Major areas inspected 
physical protection of low enriched SMI Details withheld 
(ref IOCFR2 790) 

OaODE.fi , HCOUIRE.D R Division of Engineering fc Technical 
Programs 83/10/13 Ip 13765306 24X FichB SO-013, 82/ 10/13. 
6210210194 



8210060306 Act receipt of 020027 1 tr Informing NRC of steps taken to 
Inpltment recommendations nnted In IE Emergency Preparedness 
Appraisal Rept 30-039/81-20 

SMITH,0 H Division of Emergency Preparedness & Operational Support 
02/09/29 HEIDER.L H Yankoe Atomic Electric Co Ip 13617 330 
24 X Fiche 90-027,82/09/29,8210060306 

8210060310 Responds to NRC 830630 Itr re findings noted in IE Em>rency 
Preparedness Appraisal Rept SO-029/B1-20 Corrective actions 
chemistry personnel placed on ndlo pager sy to afford 
earlier notification & response 

HEIDER.L H Yankee Atomic Electric Co 02/00/27 HAYNE8, R C 
Region 1, Office of Director. &2pp 19619-331 24X 
Fiche 80-037, 82/09/39.8210060304 



DOCKET 50-20 MASSACHUSETTS INBT OF TECH RES REACTOR 
F Security, medical, emergency b fire protection plans 

S31Q1'?0334 Forward 5 Revision 27 to SAfi for MIT research reactor, 
al-fecting physical security plan SAR withheld 
fref 10CFR2 790) 

CLARK, L Massachusetts Institute of Technology 82/10/13 
TEBEBCO.R L Assistant Director for Licensing Ip 15742 125 24X 
Fiche 50-020, 63/10/13, 821O190334 



DOCKET 50-23 WESTINOHOUSE TEST REACTOR 

Inspection reports, IE Bulletins it correspondence 

0210(30420 Forwards "Annual Insp of Retired Uestinghouse Testing 
Reactor per License TR-2 for 19B2 " 

HARD1.A J Meitinghouse Electric Corp 82/09/30 Standard! ration 

V Special Prgjectl Branch Ip 15480 264 24X 
Ftch* 50-032, B2/09/30- S210130420 

3210130426 "Annual Insp of Retired Uestlnghous* Testing Reactor per 
Ufcense TR-2 for 1982 " 

4 Westlnghouse Electric Corp 02/07/16 3pp I96BO.S&5, 24X 
Fichu 30-022, 82/09/30, 8210130420 



8210210943 Forwards Amend 73 to License PPR-3 b notice of issuance 
Amend incorporates gurd training I< qualification plan, 
in response to licensee 61O610 & 1208 Applications 
CRUTCHFIELD, D Operating Reactors Branch 5 82/09/30 KAY, J A 
Yankee Atomic Electric Co 3pp 15793 392, 24 X 
Fiche' 90-027, 82/07/30,8210210949 

6210210952 Amend 73 to License DPR-3, requir inj implementation of nuard 
training d qualification plan uiithln 60 days It qualification 
of All security personnel ulthin 2 yrs 

CRUTCHFIELD, D Operating Reactors Branch 3 83/09/30, Sp p 
13782'353 24X Flehe SQ-Q29i 32/09/30, 031 021054S 

6210210899 Notice of issuance of Amend 73 to License DPR-3 

CRUrCHFIELD,D Operating Reactors Branch 3 82/09/30 2pp, 
IS702 338 24X Flchs 30-027,82/07/30,8210210345 

6210220133 Ack receipt of 820927 Itr informing NRC of stvps taken to 
correct violations noted In IE Safeguards Imp Rept 
30-029/82-08. 

STAR09TECKI,R. Division of Project & Resident Programs B2/10/IS 
HEIDERi L H Yankee Atonic Electric Co Ip 13778.090, 24 X 
Fiche 80-029, S2/10/I5, 82102201B3 



10 



DOCKETED ITEMS 



--B2I0220157 Responds to- MRC 030901 1 tr re violation* noted in IE 
Safeguards [nip Rept 50-Q29/B2-OH Corrective- action* 
wmtifld <ref 10CFFt2 790) 

HEIDBt.L H Yankee Atomic Electric CD 62/09/27 HAYNES, n C 
Rsjic-n I. Office of Dlrtctnr 2pp 15778 071 24 K 
Ficht 30-029, B3/10/1.5.BiJlQ220153 



8210210552 Amend 73 to Licenie DPR-3, requir Ing implementation of guard 
training Si nualif itation plan within 60 dags Si qualification 
at all security personnel uithin 2 yrs 

CRUTCHFIELD.D Operating Reactors Branch 3 B2/09/30 5p P 
13782 355 24X Flchs 50-029,82/09/30.8210310545 



Operating license *tage (ocurasnti ti corres pondenee 

10040399 RBO.uets processing of lilted documents re EP Topic 
11-04 E. "Darn Integrity, " 

SHITH.H Operating Reactors Br:neti S 62/09/17 Division of 

Technical Information i Document Control 2pp 15597 226 34 X 
FIcKe SO--029, 82/09/17.92100-10399 

10040135 Forward-* safety, valuation b tesnnitl evaluation repti of 
licensee response to proposed design modi to de-graded grid 
voltage Schedule tor response requeited uithin 3O da.ya 
CHUTCHFIELD,D Operating Reactors Branch 5 B3/09/27 KAV, J A 
Yankee Afcomte Electric. Co 0pp 1 SS83 093 24 X 
Fiche 50-029. 83/09/37, 8210040132 

B21Q040139 Bafetu, evaluation n degraded grid voltage protection for 
Clasi IE iijt Design acceptable subj to resolution of lilted 
items 

Operating Reactors Brancfi 9 82/09/27 7j p 13533 097 24* 
Flche 30-029,62/09/27.62100^0132 

-820*200^75 "Proposefl Dign Mods i T*ch Spec Chingei on Qrid Voltage 
DBpadat ion tor Van** Rotii Muclear Pouer Station," 
tcchnieal nv*lutton rtpt 

SELAN.J C Laurence Llvcrmtire LaborBtorn FIH A- 0250 
UCID-19147 92/07/30 tiKC - No Detailed Affiliation fciven 

I3pp I55B3 104 24X Fich* 90-O29, 8S/O9/27, 8210040132 

210130207 ForuariJ* aafetij evaluation of SEP Topic 1 1 1-4 C r 
Internally gentratei) niiiilo Qtnei-ation of Internal 
iriinUti within facility mill not prevent life ihutdawn 
CARUSO, R Dp* rating Reactor* Branch 5- 82/09/59 KftV, J A Yanl*e 
Atomic Electric Co 2Bpp. 15692 135 B4X Ttch* 50-089.32/09/29. 
8210120207 



Fropaiiit Change 17B to License DPR-3, aid-ing !, deleting 
containmRiit Isolation valves, speciifijinQ iquipment 
paramtars. ad ding neu equipment d rec ateg-ar li Ing valvti to 
ace omniodate mod Imp lementatian during refueling outage 
HE10ER.L H Vanh< Atomic Elaccric Co 62/09/30 Of fie ( of 

Nuclear Reactor Rffjulatio-ni Director 9pp 15640 244 24*. 
Fich 50-OB?. e2/O9/30,8S10Q8009S 

B2100B0103 Pr D jioEed Tcti Spec pageii aidri ln,gi & deleting containment 

isolation Va Ives. ap-ee 1 f uing *qulpment pramfrtr . adding neu 
sqjiprasril b recategorli ing valv^i to acconmodate nod 
implementation! during refvtling outaa& 

* Yanie-e Atorntc Electric Co 62/09/30 22>P- 1S&40 253 21X 
Flctis 50-029,92/09/30. B2IOOB009B 

8310120341 Forujtrd* *aFty evaluation k technical evaluation repts of 
SEP Toplc II -3, fl. 1 1-3 fli II-3 B 1 & I 1-3 C r hydrolooic 
coni<itr*tioni Facility rfoti not meet MRC c^lte^ia 
Deviation* will be resolved in integrated tafetij aneiiment. 
CARUSB,fl aper*tlng Reictan Branch 9 B2/09/3Q BAY, J, A, Yanbuv 
Atonic Electric Co, 3!pp 19691 001 24X Fich* 50-029. 88/09/30, 
B210 120245 

B209 100369 "Hydrologlca 1 Cam id aratloni (SEP. 1 1-3 A. E, Q l.CllII-3Q), 

technical evaluation rtpt 

SHEHRERiJ Franklin Initituti/Franli lin Reiiarch Center. 
HRC-03-79-11B TBR-C5257-42i 92/08/06 STALED NfiC - No 
Retailed Affiliation Given Blpp. 19651:032 24X 
" 139, 32/09/30, B21012024S 



8210210553 Wotice of usuance of Amend 73 to Licente DPR-3 

C-RUTCHFIELD, D Operating Reactors Branch 5 82/09/30 2p p 
15782 35-8 24X Flche 30-029, 92/O9/30. BSl 0210545 

B210O70169 Forwards topic difference summary for GEP Topic II1-6, 
"Eelimlc Design Considerations" ft updated diffeience 
sum-naries for Topics V-10 B,V-11 U.VII-3(- 1X-3 re RHR BU.U 
k iijs required for safe shutdown 

CARUSO. R Operating Reactors Branch 5 82/10/01 KAY, J A Yankee 
Atomic Elqctnc Co 7pp 15627 001 34X Ficlie 50-029. B2/1Q/O1 , 
B2L0070U9 

6210070035 Forwards draft safety evaluations of SEP Topio III-& re 
ieijmic design considerations & SEP 111-11 re component 
integrity Ltcenix proposal re dedicated hot shutdown sys 
will be evaluated during integrated assessment of facility 
CARUSO.R Operating Reactors Branch 5 82/10/04 KAY, J A Yankee- 
Atomic Electric Co 20pp I562B 331 24X Flche SO- 039. S2/ 1 0/04, 
B2100700BS 

B2 1007007 1 "Seismic Design Bases & Criteria for Yankee Roue 
Generating Station SEP " 

* Engineering Decision Analysis Company, Inc EDAC 173-130 03 
DRF 79/01/31 39pp 15628 351 24X Flche 50-039,82/10/04, 
B21007Q085 

B210070074 "SEP. Review of Seismic Re-evaluation Program of Yan*ee 
Nuclear Pouer Station " 

. NHC - No Detailed Affiliation Given 92/0?/30 B3pp 
15629 018 24X Fiche 30-029, B2/10/04. 8510070085 

9210070099 "TecKnical Evaluation of Yankee Roue Power Station BiUmit 
Qiil$n, " Aug 1983 

HHIDOES.T L , BUSCH,3 I , THOMPSaN, T R EQJ.Q, Inc FIN A-&12A 
EOO-EA-6017 62/08/31 CIIENO. T Division of Licensing 3t>'Jff 
15629 100 24X Flche 50-029, 82/10/04, 6310070083 

8210)30326 Comments an proposed scope of Phase III of SEP as rcFlected 
in individual topic definition! appended to 820909 Itr 
Staff eneouragid to develop t> implement means to incorporate 
poiltive attributes of Phase III in 1 Iceneec/NRC interface 
KnCICHiR H SEP Owners Oruup KACICH.R H Northeast Nuclear Cnr g u 
Co (subi of Northeast Utilities} 63/10/07 CISENHUT, D 
Diviilon of Licensing 7pp 15682 179 24X Flche 50-000, 92/ 1Q/OV, 
8510130326 

8210130401 Concurs u/content of systematic aEtessment of licensee 
performance board recommendations, per NRC B20903 Itr 
Licensee action on primary vent stack monitor failui-es 
should be clarified to show thorough evaluation of LEfts 
KAY.J Yankee Atomic Electric Co B2/10/OB STAROSTeCKl , R 
Division of Project & Resident Programs 2pp 15682 070 S4X 
Flche SO-029. B2/10/OB, B31013040I 

8210150363 Responds to Generic Ltr 82-12 re plant working hours Plant 
policy re uoi-Hng houn should not be Incorporated Into 
Tch Specs due to IDS* of flexibility 

KAY.J A YanVee Atomic Electric Co B2/10/OB E1SENHUT,D Q 
Division of Licensing 2pp 15704 305 24X Fiche 90-059. B3/ 10/00, 
0210130343 

82101BOIB7 Clarifies B20B04 request for oddl Info re NUnEO-0737. 
Item II B 3, "Post-Accident Sampling Sij " Guidance on 
meeting tiUREQ-0737 crit*rla dlscusied 

CRUTCHPIELDiO Operating Reactor! Branch 3 H2/10/OB KAYi -J A 
Yantee Atomic Electric Co 3pp 13719,130 24X 
Fiche 30-029, B2/IO/OB, B3I0160187 



B2I02101S3 Foruards .valuation of SEP Topic I1I-3 A, "Effect* of High 
Water Level on Structures," band on 82031B BAR Turbine J, 
ive bltfgsiscreenuall & pumphous* unprotected from postulated 
flood condition 

CARUBQ.R Ojieriting Reactors Branch 5 B2/10/13 KAY, J A Vank* 
Atomic Electric Co, 7pp 1S766 027 24X Fiche 30-029,82/10/13, 
8210210123 

B2101906B6 Application to amend License DPR-3, replacing 40 fuel 
aiiamblies to refuel fnr Core XVI operation fc iniecting 
Cfjclt dependent piramatert in Tech Sped 

HEIDER.L H Yankee Atomic Electric Co B2/10/15 Office at 

Nuclear Reactor Regulation. Qirector Sop 1373B 163 24X 
Flchi 50-089,82/10/15,8210190696 



8810190690 Proposed T.ch Spec; no d inserting cucl. dependent p.rie 
Yankee Atomic Electric Co 82/10/18 2Spp, 1373B 1A7 B*X 
Fiche 30-029,82/10/13,8210190686, P 



DOCKETED ITEMS 



a3lOB0094 Application to amend App A of License DPR-3, c nns i sti rig of 
Proposed Change I 79, a 1 lowing increase in plant operating 
flexibility while maintaining sufficient RHR Fioui to ensure 
reactor vssl tatter temp does not exceed 140 F in Mode 6 
HEIDER.L H Yankee Atomic Electric Co 83/10/15 Office OF 

Nuclear Reactor Regulation, Director 2pp 13B37 IBS 24X 
Fiche 50-039.82/10/15.8310200094 



H2I013O4O1 Concur* til/content of sijstema 1 1 c assessment of licensee 
performance board recommendations, per NRC 820903 Itr 
Licensee action on primary vent stack monitor failures 
should be clarified to show thorough evaluation of LEfis 
KAY.J Yankee Atomic Electric Co 82/10/O8 STAROSTECKI. R 
Division of Project f, Resident Programs 2pp 15602 070 24X 
Fiche 50-029,82/10/08,8210130401 



8210260103 Pi oposed Tech Spec Change 179, allowing increase in plant 
operating flenbllity while maintaining sufficient RHR flow 
to ensure reactor vessel water temp does not eiceed 1 4O F in 
Mode & 

* Yankee Atomic Electric Co 62/10/15 4pp 15937 1S7 24X 
Fiche 50-039,82/10/15,6210200091 

Q Inspection reports, IE Bulletins tc c orresp undone e 

3310070007 Responds to FQ1A request for eight categories of records re 
steam generators b steam turbines App A documents provided 
in R Udell Ft) I A Request 81-313 Forwards documents listed In 
App D 

FELTGN, J H Division of Rules and Hecords 02/OS/IO LONG, D J 
Winthrop. Stimion, Putnam t, Roberts 9pp 15615 063 24X 
Fiche 50-000, 0a/OB/ IO, B2IQO7OOO7 

B21007Q139 Forwards tabulated data on steam generator insp & maint at 
facilities Data should be provided to licensees 
IPPOLITO, T Operating Reactors Assessment Branch B2/04/0 1 
VAROA. B Operating Reactors Branch 1 CLARK. R Operating 
Reactors Branch 3 STQLZ,J Operating Reactors Branch 4 5pp 
15615 131 24X Tiche 50-QQO, B2/OB/ 10, 831 OO70007 

8310070172 Forwards info re steam generator integrity & Insps at all 
operating PHfta.per 75032O ic 31 requests Details of insps, 
including defect ind tea ti ons. tube plugging criteria & tubes 
plugged ui 1 1 not bo provided eicept for Point Beach 1 
GOLLER.KR Division of Reactor Licensing (NHR-1973 only) 
75/03/24 MACCARY.H f Division of Technical HOVIBUI (NRR-1975 
onlu) 5pp 15645 I9fc 24X Fiche 50-000,02/08/10,0210070007 

3210060034 Forwards IE Safeguards Insp Rept SO-029/B2-09 nn 820002-05 
No noncomp 1 lance noted 
MARTIN. T T Division of Engineering t. Technical Programs 02/09/37 

HEIDEH.L H Yankee Atomic Electric Co 2pp IS615 031 21X 
Fiche 30-039.92/09/27,0210060031 

--3310060049 IE Safeguards Insp Rept 30-029/02-09 on 020B02-03 No 
noncomp I lanes noted Major areas Inspected testing b maint 
records. phy slcal barriers in protected & vita! areas 4 
security sus power supply Detail* withhold {ref 10CFR73 SI) 
DIM.AP.J M , SMITH. C . GODY. A T Division of Engineering fc 
Technical Programs 82/09/83 Ip ISA! 5 033 24X 
Fiche 30-029. 03/09/27. 02IOQAOQ34 

0310060306 Act receipt of 820027 Itr Informing NHC of steps taken to 
implement rec ommendationi noted in IE Emergency Preparedness 
Appraisal Rep i 50-029/81-20 
SHITH.O H Division of Emergency Preparedness & Operational Support 

82/09/39 HEIDER.L H Yantee Atomic Electric Co Ip 15619 330 
24X Fiche 5O-029, 82/09/29. B310060306 

-- B210060310 Reipondi to NRC B2Q630 Itr re findings noted in IE Emergency 
Preparedness Appraisal Rept 30-029/81-30 Corrective actions 
chemistry personnel placed on radio pager ys to afford 
earlier notification & response 

HEIDER.L H Yankee Atomic Electric Co B2 /OS/27 HAYNEB, R C 
Region 1. Office of Director 62pp 19619 231 24 X 
Fiche 50-029. B2/09/29, 0210060306 



6210290147 Forwards IE Insp Rept SQ-029/B2-10 on S20B03-0930 No 
noncomp 1 lance noted 

5TAHD5TECKI,R Division of Project Si Resident Programs B2/1O/O0 
HEIDER.L H Yankee Atomic Electric Co 2p p 13051 214 24X 
Fiche 50-029. 82/10/08. B31O290147 

0210290157 IE Insp Rept 50-029/02-10 on S20802-0903 No noncamp 1 lance 
noted Major areas inspected review of plant operation, p lant 
maint obser vat ion, p lant events, LERs . 1 icensee plant info 
rept, per iod ic b special repti & preparation For refueling 
COLLINS, S J , OALLO.R M Division of Project ! Resident Prooraws 
82/10/07 16pP 15S54 216 24X Fiche 50-029, B2/10/OB, 021 039O147 

820B190338 IE Bulletin S2-03, "Stress Corrosion Cracking in Thick- 
Mal 1. Large-Di ameter. Stainless Steel, Recircu lation Sys 
Piping at BUR Plants " Svc list end 

DEYOUNO.R C Director's Office. Office of Inspection and 
Enforcement SE/10/14 Consolidated Edison Co of New York 

lISpp 15010 123 24X Fiche 50-000, BB/10/ 14, 920S190238 

8210220153 Ac I receipt of S20927 Itr informing NRC of steps taken to 
correct violation* noted in IE Safeguards Insp Rept 
SO-029/02-OB 

5TAROSTECKI,R Division of Project & Resident Programs B2/1O/1S 
HEIDER.L H Yanltee Atomic Electric Co Ip 13778 090 24X 
Fiche 50-029,82/10/15.8310220153 

8210220137 Responds to NRC 020901 Itr re violations noted in IE 
Safeguards Insp Rapt 50-029/03-OB Corrective actions 
withheld (ref 10CFR2 790) 

HEIDER.L H Vankee Atomic Electric Co 83/09/27 HAYNE8, R C 
Region 1, Office of Director 2pp 1577B 091 24X 
Fiche 50-029. 0S/10/15, B210230I53 

3 Reportflblo occurrences, LERs & related correspondence 

8310010000 Responds to FOIA request for 19 categories of documents re 
nuclear reactor events & safety problems Forward documents 
listed in App A 

FEU TON. J M Division of Rules and Records 82/06/28 UDELL, R A 
Critical Mass Energy Project ISpp 13727 003 24X 
Fiche 90-000.82/06/29,8210010000 

8109280175 Requests addl Info re Ion of offsite power event on 910914, 
SAND3.S P Director's Office SI/07/18 CARUSD.fi Operation 
Reactors Branch 3 Ip 13730 230 24X Ftthe 30-000,32/06/28, 
8210010008 

8210010161 Discusses potential problem re sequoyah reactor pressure 
naiz le, mpp lifflBnt ing 000332 memo Underctad cracfcs found by 
us* of ultrasonic equipment Addl items of recent origin 
discussed Related info end 

DENTON.H R Office of Nucler Reactor Regulation, Director 
BO/02/S8 AHEARNE, J Convni s i oner s 9p p 1 5727 1 78 24 X 
Fiche 30-000,03/06/26,8210010008 

8210130230 Forwards LER B2-03S/03L-0 

AUriO.H.A Yankee Atomic Electric Co B2/09/30 HAYNES, R C 
Rigion 1. Officl of Director Ip 13675 2&9 24X 
Ficht 30-029,82/09/30,8210130330 



B2I01SO272 Forwards evaluation of utll response to SEP Topic II 1-3 C, 
"Inservlce Insp of Water Control Structures " Present imp 
program does not conform u/Reg Guide 1 127 t should be 
modified to Incorporate NRC recommendations 

CARUSO, R Operating Reactor* Branch 5 Q2/1O/04 KAY. J A Yankee 
Atomic Electric Co lOpp IS65I 190 24X Fiche 50-029, 82/1 0/01, 
0310I30272 



-8210130235 LER Q2-023/03L-0 on B20931,gas leak developed in weld 
joining safety valve drain line to valve body on unite gas 
decay 2 drum safety valve Cause not stated Leaking uield 
Isolated, ground out & reuielded 

RICE.DA Yanfcc* Atomic Elaetric Co 82/09/30 Region 1, 

Office of Director Ip 13675 370 24X Fiche 50-029.82/09/30, 
8210130230 



~-9207190431 "Hydrolog i ca 1 Cons i derail ons, Ins ervice Imp of Mater Control 
Structures (SEP III-3 O.Yantee fiou/e Nuclear Power Station," 
technical evaluation rept 

SCHERRER.J Franklin Institute/Franklin Research Center 
MHC-03-79-1 19 TER-C5257-544 S2/07/15 BTALEY, NRC -No 
Detailed Affiliation Owen 39pp IS&S1 200 34X 
Fiche 30-029,82/10/04.8310120272 

82Q81V0233 IE Info Notice 80-35, Suppl 1, "Laaking It Dislodged 1-125 
Implant Seeds " Svc list end 

COBB.L I Division of Fuel Facilities, Materials h Saf toward 
83/10/06 Consolidated Editon Co of Neu York &6pp 13741 950 

21 X Fiche 90-000,02/10/06,8200190233 



8210130218 Forwards LER 82-037/03L-0 

AUTIO.H A Yankee Atomic Electric Co 82/10/01 HAYNEB.R C 
Rlglon 1, Office of Director Ip 15673 239 24X 
Ficht 30-029,82/10/01,8210130818 

8210130223 LEft 82-027/03L-0 on 02090Si uhile In Mode 1, auxiliary boiler 
room sprinkler \l Isolated to stop i repair gasket leak 
Cauiad by i niuf flcient gasket contact w/valve TS-V-739 
Oasket replaced, 

MAY, E L Yank*e Atomic Electric Co 82/10/01 Region 1. DfPics 

of Director Ip 13679 236, S4X Fiche 30-029,83/10/01. 
B21013021B 



12 



DOCKETED ITEMS 



3510130519 Forward! LER 82-026/03L-0 

AUriO.H A Vantee Atonic Electric Co 82/10/01 HAYNEB.R C 
R.jion 1, Cfflct of Director lp 1 5662 361 34* 
fit.hr 50-029, 62/10/01, 8210130315 

-B210133331 LER S2-036/03L-0 on 020902. whi le performing turvii 1 lanct of 
lou nin ooUnl flou lyt train A, loop 3, ptiaie C rlV 
f*iltd to drop out uhen de-enerjued Caused bg abnorn"! 
amount of friction bttuten pjungtr 4 ufftr buihing 
FHENCH.L D Yanlee Atonic Electric Co 82/10/01 Region 1. 

Office at Director lp IS6B2 342 24X Fich< SO-029. 63/10/01, 
B21 013051 9 



DOCKET 50-62 UNIV Or VIRGINIA RESEARCH REACTOR 

E NRC Safety Evaluation Report (SER), suppls & correspondence 

9210050377 SAFETY EVALUATION REPORT RELATED TO THE RENEWAL OF THE 
OPERATING LICENSE FOR THE UNIVERSITY OF VIRGINIA OPEN-POOL 
RESEARCH REACTOR Docket No SO-O63 

Division at Licensing NUREG-0928 92/09/30 77pp Available 
at NRC *5 00 13626 030 24X Fiche 50-062,92/09/30,6^10050377 

P Op I rating license stage documents ( correspondence 



I2I0260I0 1 ? LER B2-032/01T on 621006. poi itive Indication observed during 
shipping of second Cycle full aisembl". 0-37S AnjlSiiJ ihoul 
atiembly causdJ ilight intreati in reactor coolant activity 
tfurlna tors 15 operation 

AuTIQ.H A Vanl.e Atonic Electric Co B2/IO/07 KAYNES. R C 
Bigion 1, Offic, of Director lp 1 5799 1 16 24X 
Fiche 50-029,02/10/07,821026010'' 



Q3100600B6 Inforrat of minor mods made to ECC5 piping Flaiibli piping 
installed on tank nrfe of remote coupling to provide 
necenari; meviment for coupling alignment Repair uill have 
no advene (Ffect on ability of ECCS to perform 

BRENIZER, JS Virginia, Unw of B2/09/37 Btandanfi id t idn !, 

Special Projecti Branch 6pp 13615 033 24X Fiche 50-Oi2, 
8a/ 09/27, B21 0060096 



2-1M90267 Part 21 dficiencu rept re potintial galling problem betuean 
itrm (. bonne-t of 1 25-inch t larger A105 carbon iteel & 
A192-F32 v*lvn lupflitd F*b 1701-Aug 1983 V*lvei ihould be 
lltllctd t itltn */Qr bonnet replaced 

I9ABELLE.L D Conval- Inc 03/10/11 HAVNES, R C B>gion I, Office 
of Director I7pp 15954 333 24X Fithe 90-000,33/10/11. 
B2 10290367 

JJ0260106 RO 5O-29/82-33 on B31009, "tiiln conlant pump 1 v>nt isolation 
valve uild diicavered ilfgntlij malit Meld will b( ripalred 
during current refueling outjjff 

AUTIO.H A Yankee Atonic Electric Co B2/IO/12 HAYNE9, fl C 
Reoion I. Office of Director lp 15799 1 1 9 24K 
Fieht 50-029. 82/10/12,8210260106 



'I026016S Foruurdi LER 82-029/03L-0 

AUriO.H A Vankte Atonic Elnctrlt Co 92/10/13 HAYNE8, R C 

Region 1, Office of Director lp 1579? 001 24 X 

Fichi 50-029,82/10/13.8210260163 



B210260169 LER B2-039/03L-Q on 620913, dur Ing refuillng outage in Mode 5 
ubile perforining callbr of itean generator narrow-range 
Itvtl trip lyi. trip iitpolnt 3 found less than Tech Bpec 
Unit Cauted bu ntpoint rfnft 

FfiENCH, L D Vante* Atomic Electric Co B2/10/13 Region 1> 

Offic* of Director lp 1 57<59 002 24X Ficht 30-029.83/10/13, 
S3 10240165 

[02&O4SB LER B2-039/01T on BS1013, realtor protection iiji permissive 
}Jita61>i B/S 4BO & B/S 433 found calibr out of tolerance 
'auied bij lurveillance procedure inadequacy Bistable* 

ee'Hbr 

(UJIO.H A Yankee Atomic electric Co 82/10/13 HAYNEB, R C 
legion I, Office of n( Pector , i p 15BO& 393 24X 

iche SO-0 



OSSOOBS LER BE- 032 na* been canceled 

iLirlO, H A Yantee Atomic El*ctrlc Co B3S 1O/20 HAVNE3, R C 

'3 ion I, Of Fie, of Director lp 15637 183 34 X 

lent 90-029.82/10/20.6210280035 



KET 50-54 UNION CARBIDE RESEARCH REACTOR 

Operating llc*nte itaga documents b correspondence 



0130302 Foriurli figure* inadvertantl v anttted from GO 0323 
pplication For rtneual of Llcinie R-at t addl minor 
hangis to Tech B>ec* 

OTW.H H Union Carbide Corp B2/O9/29 BEflNAflD.H 
tandardiiation l> Special Project* Branch ISpp 1S670 313 
icht 50-054, B3/0'9/29,Bai013O302 



210130306 Propniid Tech Spec changei re furled elplrimenti k 
i taffingi supplementing 800333 application to renew Licenie 
fl-Bi 

Union Carbide Corp B2S09/29 Spp 15670 333 24 )( 
Fiche: SO-OS4. 82/09/29. B21 01 30302 



KET SO-57 STATE UNIV OF HEM YORK RESEARCH REACTOR 
Security* medical, emergency t fire protection plani 



OO10377 Forudrd* Rtviilon 4 to ncuritg pln Revision withheld 
rtf 10CFR2, 790) 

EHRViL.e Nu York. 8tatUnlv of, Buffalo BR/09/17 THOMAS, C 
tndar4iritjn b Spvcial Projtcti Branch, lp 13573 191 24 X 
ltd*' 90-097, 82/09/17.9210010877 



B2IOOB0237 Foruardi licensee 83092 Hr to ORNL requesting shipment of 
DOE-ouined MTR tupe reactor fuel using HFIR spent fuel 
ihippinj ca*l 

DEHNECHE.P E Virginia. Univ of 62/09/30 CARTER./) E 
Standarifi lation b Special Projects Branch 3pp 1S63H 07fl ,*4X 
Fiche 50-062,82/09/30,8310080237 

8210120475 Foruardi Amend 15 to Licenie R-i6. CIA t> notice of usuant*/ 
negative declaration Amend reneui DL for 20 ijr> 

THOMAS. C Standardnation t- Special Projects Branch 82/0 9 /JO 
BREN1IER. J S Virginia. Univ of 2pp 15672 005 24X 
FUh> 50-063,82/09/30,8210120473 

B2101204BO Amend 15 to License R-66, renewing OL For SO qrs 

THOMA8.C Standardliation t. Special Projects Branch 32/09/:iO 
34pp 15672007 24X Fiche 50-062,82/09/30.8210120475 



-B2101204B7 CIA supporting Amend 15 to License R-66 

Standardliation t. Special Projects Branch 02/O9/30 
15672 042 24X Fiche 50-06S, H2/09/30, 021 0120475 



3pp 



B210IS0492 Notice of renewal of facility OL !< negative declaration 
re Amend 15 to Llceni* R-66 

THOMAS.C StandardJidtion i Special Projects Branch 02/09/30 
2pp 15672 049 24X Fiche 50-062, Q2/09/30, 021012O475 

B2101HOOI4 Sobnlti daily highlight for B20930 NBfl Isgued 30-yr 
reneual of License R-66 

CARTER<R E Standard! lation b Special Project* Branch 82/10/01 
CASE.E . CARTER.J Office of Nuclear Reactor Regulation. DlncUr 
EISENHUT, D Division of Licensing lp 13717 352 24X 
Fiche SO-062, B2/10/01, 8210180014 



DOCKET 50-70 GENERAL ELECTRIC TEST REACTOR 
C Adjudicator^ correipondence 



6210200087 Notici at ASLB reconst itution JH Frye. cha irman & H For*mar, 
t CA Llnenberger. members 

COTTER. fl P Atomic Safety and Liceniing Board Panel B2/IO/H 
Sff 15753 196 24X Fiche 30-070,82/10/14,6210300087 

82102203*3 Memorandum t order directing OE to file rept on intention to 
tubnlt applicatloni to renew OL !, SHM Uc*n se, uith in 15 days 
of ivc of order 

FRYE.J H Atomic Safety and Liceniing Board Panel 82/10/31 
Oeneral Electric Co 3pp 15776 263 34X Fiche 30-070,82/10/21. 
8210220343 

P Operating license stage documenti 4 correspondence 

B2102S0110 Application to amend Licenie TR-1, reo,uei tins addl Tich Bpti 
change) reflecting reovl of irradiated BNM bu eliminating 
tests re reactor bldg integrity 

CUHNINOHAM.O E General Electric Co 82/10/12 TEDESCO.R L 
Aislstant Director for Liceniino 2po 15767 02S S4X 
Fiche 50-070,62/10/12.0210250110 

" 8S i?f 5 ? U3 , Propo " (l Tich fi P Be el**"!*' reflecting removal of irradiate 
HW by elininating tuts re rctor bldg intejritu 
General Electric Co 82/10/12 3pp, 15707 030 S4X 
Fiche 30-070, BS/10/12, 0210230110 



DOCKETED ITEMS 



13 



DOCKET 50-72 UNIV OF UTAH RESEARCH REACTOR 



At* receipt of 020924 Itr Forwarding revised annual 
operating rapt for 1981 

SE1DL,W C Division of Resident. Reactor Project & Engineering 
Program B2/10/22 JAC.ODB.H R Utah. Univ of Jp 15799 156 
?4X Fiche 90-072, B3/10/22, 8210360224 



R Periodic operating reports & related correspondence 

82 102501 92 Forwards third quarterly status rept re plant opera 1 1 nnal 
status d util activities, per H3O216 order Study re future 
deposition of plant uill be completed within & months of 
issuance of NRC final reactor safety pulley itaternent 
QHLBACH.R , CRANE,f> A LOCKE. R f Pacific Gas S. Electric Co 
BS/ 10/01 LA70p R rf . 9CHINK, B R . LINENBERflER, O Atomic Safety and 
Licensing Board Panel 3pp 1 57B7 336 24X Fiche 50-133.02/10/01, 
B21 0290192 



-8310260230 Forwards revised "Annual Operating Kept, 1981 " 

JACOHS,H R Utah, Uni, of 92/09/24 MADSEN. G L Region 4, 
Office of Director lp 1S799 157 34X Ficha 50-073,03/10/33, 
BSl 0240224 



-B210260334 Revised "Annual Operating Rept, 1981 " 
5AND3UIST.G M Utah. Unw of 93/O9/34 3pp 
Fiche 50-073,02/10/33.0210240224 



DOCKET 50-93 UNIV DF FLORIDA TRAINING REACTOR 

d Inspection reports. IE Bulletins & correspondence 

9210010120 Forwards IE Insp Rept 5O-OB3/B2-02 on 020811-13 NO 
noricomp 1 lance noted 

VERRELLI.fl ff Division of Project t- Resident Programs 92/09/31 
-JACOBS, AM Florida, Univ of, Gainesville 2pp 1S566Q32 34 X 
Fiche SO-O8J. 82/OB/31, 8210010120 

--6310010122 IE Insp Hept 50-OQ3/92-0? on B20811-13 No noncomp 1 lance 
noted Major areas inspected radiation protection 
PEERV.W W . BARfl.K P Division of Engineering i Technical 
Programs S3/08/30 3pp 19566 034 24X Fiche SO-OB3, B2/OB/3I , 
B2100I0120 



DOCKET 50-133 HUMBOLDT Qrt V POUEfi PLANT, UNIT 3 

F Security, medical, emergency (. fire protection plans 

R21Q01019B Forward* safeguards iffo re changes Implemented IP security 
plan Info withheld <ref 10CFR73 21 J 

CWflNE.P A Pacific Qas t. Electric Co B2/07/33 DENTON, H R 
Office of Nuclear Reactor Regulation, Director lp 15968 077 31) 
Fiche 50-133, S2/09/33, 831O010J9H 

fl Adjudicatory correspondence 



221006018'? Ordur etending time until B2I013 for Commission to act to 
review Director's Decision OD-B3-7 

CHILK.S J Office of the Secretary nf the Commission 83/10/04 
Conmisiioners lp 15613238 34X Fiche 50-133,62/10/04, 
821G0601B9 



8210250196 Third quartarly status rep t for facility Certificate of Sv 
one 1 

LOCKE, R F Pacific Saa fc Electric Co B2/1O/O1 4pp 137H7 330 
24X Fiche 50-133,82/10/01,9210350193 



DOCKET 50-143 UCLA TRAINING REACTOR 

F Security, medical, emergency & fire protection plant 

02102900S3 Partial response to F01A request for documents re UCLA Lao 
tr research reactors Forwards documents Hated in App A 
FELTON, J M Division of Rules and Records S2/0'7/O3 HIK3CH. D 
Government Ac countao 1 1 1 ty Project 2pp 1 5B64 195 24X 
Flche 50-142,82/09/03,9210290023 

B210390O36 Requests that licensee submit neu physical security plan 
to comply u/neui regulations to lOCFRSO. 70 b 73 bg 740 J 07 
8KOVHOLT, D J Atomic Energy Commission, Directorate of Lie arising 
73/11/30 HICKS, T E California, State of lp 15B64 259 24K 
Fieri* 30-142,02/09/03.5210390023 

BSI0290043 FBI-ward* addl info re physical security plan Info withheld 
(i-ef 10CFR2 7901 

ASHBAUGH, C E California, Univ of, Los Angelas 74/11/27 
COLLER. K R Atomic Energy Commission, Directorate of Licensing 
Ip I3B64 360 24X Fiche 30-142, B2/09/03, SaiO29Q023 

8210390051 Forwards SNM Inventory Info for nonpciuor reactor Facilities 
Info withheld (ref 10CFF12 790 Author! lat ion to retain, 
Inventory requested 

ABHuAUOH.C E California, Univ at, Lot Angelas 76/01/30 
OOLLEfl.K R Division of Operatinrj Reactors 3pp 15864 343 S4X 
Fiche 30-143,82/09/03,9210390023 

8101300333 Notifies that unce reactor operating fe S.VM storage, sites 

jra contiguous. facl 11 ty must Implemant interim Category I 

physical securitv requirements Compliance plan required by 
810131 

MILLER, J R Standardl lation fc Spacial Project* Dranch fll/OI/13 

WEOST.W F California. Univ of, Los Angeles lp 15865 093 
2-JX Fiche 50-H2.82/09/03.B21Q390033 



Adjudicatoi-y correspondence 



B3E0150193 Advises that Commiision declined review of Director's 
Decision DD-82-7 Time for Commission to act epired Decision 
became final agency action an B21012 

CHILK.S J Office of the Secretary of the Commission 82/10/13 
GUEMTHER, H Affiliation Unknoun lp 13707 339 24X 
FicM 50-133,92/10/13.8210150193 

P Operating license stage documents t< corres pondencB 

Q21O2iO359 Responds to oenoric Ltr B2-12, "Policy on Factor* Cauflina 
Fatisue of Operating Personnel at Nuclear Reactors " 
Eiistlng procedures comply u/pollcy statement 

CflANE,P A Pacific Oa fc Elctric Co B3/IO/21 rURAQLIA,F J 
Licensinfl Branch 3 lp 15804 3SB S4H Fiche 30-133, 02/10/31, 
82 1 0260359 

Q Inspection reports, IE Bulletins & correspondence 

B20B170233 IE Info Notice 80-35, Suppl 1, "Leaking (, Dislodged 1-125 
Implant Seeds " Sve list enel 

COPB. L I Division of Fuel FaciHtlis, Materials b Safiguardi 
S3/1O/06 Consolidated Editor, Co of NBUI York &&pp 13761 SSO 

24X Fiche 50-OOOr 02/10/06, 8300190233 

0203190239 IE Bulletin 82-03, "Stres* Corrosion Craikino in Thick- 
Hal 1, Large-Diameter, Stainless Btflel , Rec ircu latlon Sys 
Piping at DWR Plants " Bvc list encl 

DEVDUNO.R C Director's Office, Office of Inspection and 
Enforcement 02/10/14 Consolidated Edison Co of Neu York 

MSpp 15810 1S5 24X Fiche 50-000,82/10/14,0308190238 



6210QB0077 Response supporting Committee to Bridge the Qp 030930 
nation for summary dismissal of NRC Si util 020901 % 03 
motions for ummary disposi tlon. A8LB ttatements on use of 
summary dlipoiitlon flagrantly disregarded by NRC 6 util 
SHIRLEV.B J 8*nta r[anlca,CA 82/1O/06 Atomic Safety and 

Licensing Board Panel 6pp 15640 193 24X Flchr 5O-I4S. 83/1O/06, 
8310080077 

6310130361 Reiponsi opposing Committee to Bridge tha Oap 830920 notion 
to dlsmin NRC & applicant 820701 summary disposition 
motion* Eitension until 9-2111S should be granted to allow 
Committee reiponse W/Cert If icate of Svc 

WODDHEAD,C P Hearing Branch I 82/10/00 Atomic Safety and 

Licn*ing Board Panal 26pp 13693 184 24K Fiche 90-142,82/10/08, 
02101 S0261 

9210150454 Rupontt oppoiing Committee to Bridge the Cap 92-0930 motion 
to dismiss NRC ti util inotioni for summary disposition 
Comminion rule* preclude dismissal of summary disposition 
motion* filed per ichidul* W/Certlf lat of Bvc 

CORMIER. W H California, Univ ofi Los Angeles, 32/10/06 Atomic 

Safety and LUenilng Board Panel l?pp 15703 13S S4X 
Rich* 90-143,02/10/00,8210150456 

B2I02S0076 Forunrdi UCLA 821008 Itr to NRC amending Fell 1980 licn** 
reniUMl pplicatlon Change* include reducing licensed limit 
on permlislble Inventory of fuel to lets than 500 g 
enriched U-339 

CPRMIER.W H California, Univ. of, Los Angtlei. G2/10/1S 
FRYExJ H < PARIS, H , LUEBKE, E A Atomic Safety and Uc.n.ing Soard 
Panel llflp 13789 353 24X Fiche SO- MB. 82/10/1 5, 8210230076 



DOCKETED ITEMS 



8210350223 Memorandum t order denying Committee to Bridge tha Gap (CBfi! 
620920 motion to summarily dismiss NRC & util motions for 
lummarij disposition or alternative relief UCLA.NflC tt CBO 
must furnish lists of citations of matt fact 

LUEBKE, E A , PAR IS, O H . FRVE. J H Atomic Safety and Licensing Board 
Panel 82/10/25 Commit toe to Bridge the Gap 12pp 15789 314 

34X Fiche 50-142.83/10/23, B2102S0223 



P Operating license itag tfoeumints correipondenc e 



Requeits amend to application for 10CFH70 lic*nse to reflect 
reduced inventory of unl rradiat ed U-235 reactor fuel 
THOMAS. C Standardnation ! Special Projects Brancfi 82/09/27 
MEOST.M F California. Univ if. Los Angeles lp 15696 OB2 24* 
Flche 50-142, BS/OW37, 02101301 I 5 

6210500091 Application for amend to Feb 19QO renewal application for 
License R-7 I, rep I ac 1 ng pages re reduction of permissible 
inventory of reactor full t altering purpose & function of 
lafety high I BVI I radiation monitor 

WEQST, H F California. Univ of. Let Angeles 92/10/O3 
THOMAS, C Standardifat ion t Special Projects Branch lOpp 
157B3 198 24* Flche 50- 143. 85/10/08, 821O20OOB1 

B21Q25D076 Forwards UCLA B2100B 1 tr to NHC amending Fab 19BO license 
renewal application Changes include reducing licensed limit 
an permissible inventory of fuel to 1 e*s than 500 g 
enriched U-235 

CORMIER, HH California. Univ of. Las Angeles 
FRYE.J H , PARIS. M , LUEBWE., 



DQCKEF 50-153 DIG ROCK POINT MJCLEAR PLANT 

F Security, medical' emergency fr fire protection plant 



Panel 



UPP 



S2/10/15 
Atomic Safety and Licensing Board 



15739 352 34X Flcfie 30-142.83/10/15.6310250076 



Inepection reports, IE Bulletins 6 c orresp otidenc B 

6310290033 Partial response to FQIA request far documents re UCLA Lab 
tr research T sac tori Forwards documents lifted in Ajip A 
FELTON, J M Division of ttult-s and Records B2/09/03 HIRSCM.D 
fiovernm.e-nt Ac coun taoi 1 i ty Project 3pp 1 5B64 195 24 X 

ricfit go-i-12, es/c-7^03, eaioa023 



9210290049 Discusses imp of activities duthariied under License fi-71 
SNH-9T4 on 750520 No ooncomp 1 lance noted Major areai 
Impacted control of EMM t. uleetive eians of procedures d 
personnel i nttrvi euis 

ENOELKEM, R H Region 5, San Francisco, Off lie of the Director 
75/Ofi/IO BROHN. W V California, Un iv of. i_m Angeles lp 
I5B44 562 24X Fiche 50-142. S2/O9/03,821 0290023 



DOCKET 5Q-I4B WWIV OF KANSAS RE9EARCH REACTOR 
H fieneral corr tspondence 



B209270090 FOIA request tor six documents re Unlv of KS research 
reactor 

flOaiNEOH, S Affiliation Unknoun B l 2/O9/47 PELTOW, J tl Dlvnion. 
of Bulei and Hflcordi Spp I9i3fi &1O 24X Flche-SO-He.e3/09/O7, 



9203290097 FQIA request tor dacumentl re Univ of KS rviearcn reactor 
UARNESjC Affiliation (Jnfctidun B2/09X07 DocketinS ft Servicea 

flcanch lp. 15BB7 119 SAX Fiche 50-I4B, 92/09/O7, 830Q290097 

82100&04G7 Hesjondi to FQIA request for si* documents r? Univ of KS 
rexaarch reactor Req.u<st referrad to PDR For protesting 
FELTON.JM Division of Rules and Records 82/09/13 HOHIHSON, 8 
Affiliation UnHnoun lp JS636 212 24X Fiche. 50-14B, B2/0/13, 
6210060437 

B2iOaS03Bf Respond! to FQIA request for lifted document* rg Un I v of K9 
r'lfarch raac tor R>q.uest referred to PDR far pracesilng 
FfLTON.J H Dlvllign of Rules and Records BSfCf}/ 14 BARNE3,C 
Affiliation Unknown lp I5B59 ISO 24X Fiche SO-14B, BB/09/14, 
S2102S03B9 



DOCKET SO- 131 UNIV OF ILLINOIS RESEARCH REACTOR 

g deportable occurrencet. LEfli & related eorre ipondencr 

831013047i RD from B20103-O5O5 reactor operated undar rKctor operator 
iii/^eiplrad lie ini. Cu*Bd by ov*rsight Unllcenied operator 
in charge of operation For jpproi SO-h. Individual tFiling 
application for Hc<n*e 

BECK, 0. P Ulinoii, Univ of, Urbana~Ch<npalgn 33/09/29 
Dlvitioti of Llceniing ttff 156S2-141 34X Fiche 30-1S1.B2/09/S9, 
8310130476 



92100&0232 Foruard* "tlill f "~e protection info re associated circuitsn 
alternite safe inutdoun design & emergency condenser caustic 
attack, in response co NF1C 830430 Hr t, MJC questions raised 
during BSOTOB-O? site meetino coneernino 10CFH50 App B 
UANDEWAt-LE, D J Consumers Power Co 62/09/30 CRUTCHF1EL.D. t> 
Gperafing Reactors Branch 5 57pji 15620 062 24X 
Fiche 50-155, 82/09/20, 6210060232 

9310090279 Confirms commitment to incorporate responses to IE Inap Kept 
50-155/61-17 into emergency plan implementing procedures t. 
requests approval to use general ofc control ctr as 
temporary emergency operation! facility 

VANDEWALLE. D J Consumers Power Co B2/10/01 KEPPLERi J (lesion 
3, Office of Director 5pp I 5638 203 34X Tichc 50-1 55. B2 / 10/01. 
9310080379 

B21Q2Q0039 FoTiuards emergency preparedness pamphlet for use in S-milt- 
mergincy plannlns 'one in Charlevon Count V & part of 
Em nit County Pamphlet incorporates revisions fc mods set 
forth lt> ASLB B30B06 partial initial decision 

(JALLO.J Isham, Lincoln t BeaU CALLO, J Consumers Pouier -Tn 
32/10/14 OLOCH.P B . PARIS.O H , SHQN, F J Atomic Bafetg and 
Licensing DoariJ Panel 30pp 15756 1-19 24X Tichc 50-1 55. B3t 10/11. 
321020002? 

6210250371 Provides addl info on proposed shift technical advisor 
position based on review of plant administrative procedures 
ii lite emergency plan Si implementing procedures Min shift 
provide* necessary protection jn event of emargencij 
DORDINE.T C Consumer) Power Co 02/10/19 CHUTCHFIEt.!), D 
Qperatino Reactors Branch 9 Jpp 15790 136 2flX 
Ficfi* 50-1S9, 62/10/19, B2I0250371 



Ad judl CJtoru. rorreipondenCE 



8210010400 Motion for extension of time until 921011 to file petition, 
for reconsideration 4/or motion For clarification re 
amor) trie Y planning portions of ASLD B20914 decision 
Certificate of Svc end 

OALLO.J Consumers Pouer Co OALLD. J Isham, Lincoln !. Dnalfl 
B2/09/38 Atomic Safety and Licensing Hoard Panel 3pp 

13S7S 176 24X Flche 50- 1 35, 93/09/2B, B210010-IOB 

D2IOO 10146 ForuariK util 320916 1 tr to NRC re future scheduling 
matters- in ipsnt fuel pool mod proceeding Delated 
corrup ondence 

OALLO.J llham. Lincoln Si Brale OALLO, J Consumers Pouer Co 
32/09/29 BLOCK. P B , PARIS, D !i . BHOM, F J Atomic Safetu anil 
Licenilng Board Panel 4pp 1 5572 292 24* Flcho 90-155.02/09/29. 
3210010446 

B2100400HI Forward! proposed finding of fact fc conclusions of law on 
O'Neill Contention It E 3 re critlcalitu 

GODDflHO.R J Hearing Hrancli 3 82/1O/OI HLOCH, P U , SHONt T J , 
PARIB,D H Atomic Safety and Licensing Board Panel lp 15504 QJ.? 
24X FUhl 50-lSS.a2/10/01,62100400BI 

B2100400B3 Propoied findings of fact & conclusions of lau on O'Neil) 
Contention II E-3 re criticality 

CODDARD, R J Kiaring Branch 3 B2/10/01 lOpp 15SQ4 313 24X 
Fiche 50-153,82/10/01,8210040081 

S3100S0232 Propoied initial deciiion on criticalltg contention 
Certificate of BVI encl 

GALLO.J , THORHTON.P Con*umeri Pouier Co OALLO, J Isham, l-incoln 
t, Biale 92/10/01 26pp 15610 353 24X Fichs 50-155,82/10/01. 
B2 10030233 

9210050356 Proposed findings of Fact h conclusions of lau on 
critlcalitu cgnt'ntion Certificate of Svc encl 

OM-LQiJ , THORNTON.? Consumers Pouier Co OALLDi J Iihaf. Linteln 
* Beale 93/10/01 17pp 13609 035 24X Flche 50-155i S2/ 1 0/01, 
821005035a 

B210060204 Hut ion to estiollih hearing dates during uik of BBl 1 1 S-19 to 
lltlg*te Chriiti-Maria CDntentioni 2,9(11,9(61,9(8) k 9(9) & 
O'Neill Contention! II A, II D I tt E-4 Earlu resolution of 
iiiuti serves intereiti of parties W/Certlf icate of Svc 
OALLO.J Cnniumsn Power Co OALLO, J Qallo< J 82/10/01 
Atomic Safety antf Licintinj Board Panel Qpp 15614 163 24X 
Fichl 90-199.62/10/01,8210060204 

BS100a0192 Order deferring briefing of Chritta-Maria eiceptions to 4BLB 
920719 third partial initial decision b tailing time far 
filing eiceptlons to future partial initial decisions until 
vc of last decision Piecemeal revleui unproductive 
TDMPKIW8, B A Atonic Safety *nd Licencing Appeal Panel B2/ 1O/0-1 
3ff 15613,270 S4X Flche' 50-159, B2/10/Q4, SB10060192 



DOCKETED ITEMS 



15 



51O13Q44B Forwards reply to intervenoi proposed Finilings of fact 
conclusions of law on O'Neill Contention 1 1 -C re cask drop 
i s ue 

COPELAND.V G Isham, Lincoln & Heale CQPELAND, V O Consumers 
Peuar Co B3/10/06 QLOCH. P B , PARIS, O H . BHON. F J Atomic 
Sdfety and Licensing Board Panel lp IS6B2 110 24X 
Fiche 50-155. 03/10/06,8210130449 



0210210349 Memorandum , order denying util B21001 motion to establish 
hearing dates & 821013 motion far clarification Hearing on 
times delated by applicant deferred Clarification motion 
not ripe for adjudication 

EILOCH.P , PAfHS.O H , SHOW, F J Atomic Safety and Licensing Hoard 
Panel 02/1O/19 Consumers Power Co 3pp 15764 201 24X 

Fiche 50-155.02/10/19,3210210349 



-B2I0130457 Replij to intervenor proposed findings of fact ti conclusi 
of lati on O'Neill Contention Il-C re cask drop issue 
GrtLLD.J : ropELAND.V G Consumers Pomer Co OALLO, J Isham, 
Lincoln '. Denis B3/10/O7 9pp 15602 119 24X 
Ficlie 50-155,92/10/06,0210130440 



-0210130471 affidavit of TC Dordina r 
.isual acuity requirement for cra 
u/stds of ANSI B3O 2-1976, "Overhe 

nanniNE, T C Consumers Pataer Co 
F-icho 50- 155. B3/10/O6, 8210130440 



e util commitments to upgrade 
e operators to comply 
d t, Qantrys Cranes" to 



15652 1 20 34X 



D210150300 Motion for ei tension of time until B212O3 for util to 
denonatrate that def i r t enc I es ore remeif led. are not serious 
or arc being remedied Util has diligently pursued steps to 
addi ess def ic icnc ies 

GALLO, J Consumers Power Co GALLO, J Isham, Lincoln & Beal 
82/10/12 Atomic Safety and Licensing Board Pane! Spp 

13707 273 34X riche 50-155,03/10/12,0210150300 



--EI2IQI50307 Affidavit of HIJ Sinderman re util ac 
ASLH 820914 initial decision Adrfl time requir 
h document info in nanner consistent [u/ASLfl r 
Certificate of Svc encl 

SINUEBHAMpR U Consumers Power Co H2/10/1I 
24X Fiche 50-155. QZ/10/ 12. B2101 503OO 



tions in rospona 
ed to assemb 1 e 
c q u e s t 

I6 P n 15707 



B21QI50341 Responses opposing licensee motion to fragment hearing 
Intervenors would be domed right to be represented by 
counsel , noney luould be masted & fragmentation would violate 
intent O f ASLAD order Certificate of Svc end 

SEUHCLiU Chnsta-Miii la SEHHEL. H AntiQth College of Lau 
02/10/12 Atomic bafety and Licensing Board Panel 6pp 

1570600? 24X Fiche 50-155,82/10/12,0210150341 

BJ10150470 RBRly to Cftr i sla-Mar la 0H0927 propoaad findings of fact 8c 
conclusions of lau on Q'Meill Contention IIE-3 ro 
cnticality Contention M/o merit t- should be dismissed 
Certificate nf Bvc encl 

GALLO.J , ThOfiNTON.P Consumers Pouier Co QALLO, J [sham, Lincoln 
4 Deals S2/IO/12 lOpp 15703 063 2flK Ficne 50- 1 55i 02/1 0/13, 
82l0150i}70 

S210ia02Oh Mplion for clarification d/or petition for reconsideration 
of portion of ASLB 020914 partial initial dBcifiion re logjl 
reiliiircment of NUREQ-0654 Terra "relocation requirement" 
unclear Ceitificate of Svc encl 

GAULO. J Consumers Power Co OALLO. J Isham. Lincoln b Beale 
13/10/12 Atomic Safety and Licensing Board Panel 6pp 

15710 I2S 24X Fiche 50- 1 55. B2/10/12, EJ2101S0306 

B210I6034J Motion for eitension of time until 021013 to File motion FDI 
clarification i>/ar petition for reconsideration of ASLB 
B20914 partial initial decision Holiday to honor Columbus 
Day not considered In schedule 

OALLD, J Consumers Power Co OALLO, J IB ham, Lincoln & Deale 
32/10/12 Atomic Safety and Licensing Board Pansl Spp 

15718 059 24X Flehe 50- 1 59. 02/10/ 12. 02101BO243 



8310210331 Opposition to licensee motion to continue plant operations 
w/o compliance ui/ASLQ order on emergency planning Continued 
operation u/o adequate planning poses throat to lives 1 
health of citliens H/Csrt 1 f icate of Svc 

SEI1KEL, H . HIKTQf.D Chr i sta-Mana SEMHEL, H Antioch Collego of 
La<ii 03/10/21 Atomic Safety and Licensing Board Panel 6pp 

13765 153 24X Fiche 50- 155, B2/10/21 , Q3102 1O30I 

0210220330 Memorandum (. order granting util 321012 motion for eitalifliiiii 
of time until 821203 to tomply w/ASLB 331014 order to 
demonstrate compliance Hi/Commission emergency planning 
requirements 

BLOCH.P D , PARIS.O H , SHON. F J Atomic Safety and Licensing Han Hi 
Panel B2/1O/21 Carolina Powar 4 Light Co 3pp 13776 OOH 

24X Fiche 50- 1 55, 02/10/21 , 821023Q333 

0210250301 Advises that Region 3 will notifij util to delete erronoilus 
language in omaroency preparedness pamphlet re respiratory 
protection measures Mods mould not contreveno ASLB order 
OODDARD.P, J Hearing Branch 3 83/10/23 DLOCH. P B . PARIS, II , 
SHON,F J Atomic Safety and Licensing Board Panel Spp 15790 I' I') 
2-JX Fiche 50-155.02/10/32,8210250301 

B310290291 Confirms Q21Q26 telcon Intervcnor has not decided whutlinr 
to file 10CFR2 306 petition to suspend or revoke license 
because of emergency planning concerns 

DACHMANN.RO Hearing Branch 1 B2/IO/2B SEMMEL.H Antioch 
College of Law Ip 15054 072 24X Fiche 50-195,02/10/28, 
03103902?! 



J Insurance & indemnity information 



S210050100 Submits responses to S20712 questions concerning add I 
insurance coverage re B20622 request for exemption 
BACON. J L Consumers Power Co B2/00/10 SrtLTZMAN, J Office nf 
State Prooranu, Director 3pp 15603 390 24X 
FJelie 50-153, 02/06/10.8310030100 

P Operatinj license stags documents fr correspondence 

Q2I03B0013 Responds to FOIA request for all i nterna I. non-pub I ic 
documents, nomosi evaluati on repts fr other mat! dealing u/ 
nuclear plant operations Forwards document' listed in App A 
rELTON, J M Division of Rules and Records 92/09/17 MCINNISi I) 
News & Observer 5pp 15B60 065 24X Fichu 50-OOO.B2/09/17, 
B2102B0013 

0203310034 Forwards draft info notice i-e deficiencies in air filtration 
(- ventilation sys Hot ice based on radioactive resin releiae 
at Pilgrim 1 & on four related events at other plants 
involving deficiencies in maint '< testing of filter sys 
MATTBOM.n J Division of Systems Integration (post BI1005) 
82/OB/OS JORDAN.E L Division of Engineering t. Quality 
Assurance Spp 15B61 024 34X Fiche 90-000,02/09/17,0210200011 



G2I0150167 Homorialiies B2100B telcon u/ASt-D re NfiC position on util 
B2IOQ1 motion to establish hearing dates NRC agrees to 
splitting hearing into tuo phases but dates pose unalterable 
conflict u/another hearing for ASLB chairman fr NRC counsel 
GODDARD.R J Hearing Branch 3 B2/10/13 DLOCH, P D , SHON, F J , 
PARIS.O H Atomic Safety and Licensing Board Panel 2pp 
15707 100 24X Fiche SO-I 55, S3/10/I3, B3101 30167 

8210150469 Forwards Zech 031012 trip rept of 930929 site visit, 
suirraan i ing events t, conversations 

ROBERTS,! M Commissioner* S3/10/I3 SEMHEL, H Antioch College 
of Lam BEMMEL.H Chr is tfl-Mar la 3pp 15703 060 24X 
Fich* 50-155,83/10/13.0310150469 



0210200029 Forwards emergency preparedness pamphlet for use In S-mtle 
emergency planning tone in Charlevoi* County & part of 
Em-net County Pamphlet Incorporates revisions t* mods sat 
foi-tn in ASLD 030806 partial initial decision 

GALLOr J ISham, Lincoln L Beale GALLO, J Consumers Pouier Cn 
62/10/14 BLOCH.P . PARIS.O H . SHON, F J Atomic Safety and 
Licensing Board Panel 30pp 157&S 149 24 X Fiche 50-153/ 83/10/14, 
62 1 0200039 



10 



DOCKETED ITEMS 



B210Q7001B Draft "Offsite Dose Calculation Manual," Palisades Plant 
t Consumers Power Co B2/O9/24 55pp 1562B 276 2** 
Fiche SO-QOO, BJ/09/29, 9210070013 

8210050425 Foruardt "Evaluation of High Energy Pipe Gruak Inside 
Containment for Big Rock Point Wuclear Plant," in response 
j- CFP Tt\fiit III 5 3 

MANDEHALLE, J Consumers Paw** CD 02/07/30 CRUTCHFIELB, D 
Operating Reactors Branch 5 2pp 15607 042 SAX 
Firhe 30-103. B2/09/30, 821005042S 

aalOC-50427 "Evaluation of High Energy Pipe Break Inside Containment foi 
Dig flocl Point Nuclear Plant " 

WEBER. W V MAGEfl.T R , R ICCftHDELLA. P NUTECW (Nuclear Technalngu, 
Inc I CPC-Ot-110 fiOD Bl/IO/33 7"?pp 15407 044 34X 
Fl-che 50-155,83/09/30,8210030425 

E2I006015? Cornmen,U on WflC draft safety evaluation of SEP Topic V-5, 
"RCPD toalrBB Dt tectaon. " per 820319 request Info muting 
from T*ole* I J 3 of S3O319 subrtiittal encl Detection au> 
(neat Intent of current licansunj criteria 

VANDEWALLE, D J Consumers Pouer Co B2/O9/30' CRtlTCHFIEUM) 
Operating Reactors Branch 5 9pP 1SA14 047 2<IX 
Fiche 90-153, 62/09/30.8310060152 

6310060239 Forward* response to HttC request for add) Info on SEP Topic 
1(1-2. "Wind & Tornarfo Lo-adinji " ApP C soporsndes 0SO903 
subnlttal Dratiins Jhotiing croa-*c t ion of south end of 
control roon uall Jn be retrieved from NMS5 

VANDEWALLE.D J Consumeri Pousr Co B2/O9/30 CRUTCHFIELD. D 
Qfei-ating Reactors Dranch 5 12pp ISil^ 327 24X 
F(cne 50-13S, B3/09/30. 8310060239 

B210060341 "Spec* for Dea igning , Furn 1 sh ing t Erecting Jietnfor ced 
Concre'te Ch inney " 

* Bethtel Corp 31S9 C-21 41/03/17 I2pp 1561 339 H4X 
Fichs 50-(35, 92/09/30,3210060339 

S310250091 Forwards draft safety evaluation Ic tecfinical evaluation 
rept, "Desijn Codes, DBS ig n Criteria 6 toad Combinations 
(SEP I1I-7 B>,Bi9 Rock Point IJ Utll requested to respD-ndl to 
factual -CDrrectneii of SER in 30 rfaijs 

CflUrCHFIELD,D Oparatins Reactors- Branch 5 B2/0'9/30 
VANDEMALLE,1> J Consumers Poiuer Co llpp 157BB OO1 34X 
Fiche 50-155. 83/09/30, 8210250091 

82Q7I60459 "Daiign Cades, Dei I gn Criteria Si Loading Combinations 
(&EP 111-7 BI.Big Rock Point," technical evaluation rept 
STILHELL.T FranHin |nt tl tuta/Frank 1 in Ruearch Center 
HflC-03-79-I IS TEJ1-C5257-317 82/07/13 PEFlfilNKO, D NHC - Ho 
Detailed Affiliation OJv*n al^pp 157BB 012 24 X 
Flch* SO-1S&, 82/0-J/30, 0210330091 



821015046'? Foruardt Zech 821012 trip rept nf S2092B *ite visit, 
iu-nraari i ing events t, ronvenati nns 

ROBERTS, TH Commissioners 92/10/13 SEMMEL. H rtntiocli College 
of Uau SEMHEL.H Chn sta-Har la 3pp 15703 06O 34X 
Flche 30-155.52/10/13,5210150469 



luation of SEP TQJIIC 

Low Pressure 
Core spray 5i; E 



821O150533 Co/n-nenti on 020015 final safety ev 
V 1 1 A, "Requ irementt for Isolation of High 
Sys" * V-ll B, "RHFI Interlock Requirements 
designed to perform function safely 

TCUEH.K A Consumar Pouer Co B3/10/13 CFiUTCHFlELD, D CJpcrdtir 
Reactors Branch 5 flpp 15713 115 24X Flche 50-155, 92/1O/ I J, 
BSl 0150533 

821O230213 Forward! evaluation of SCP Topic I 11-4 C, "Internally 



elated SEfi Facility 
Will be basic input 



Generated HissilEi," >r 

criteria for topic Irtf 

sarety atseisinent 

CRUTCHF1ELD, 1) Operating Fleactor? Branch 

VAIJDEUALl-e. D J Congumers Power Co 25pp 

Flche 30-153.82/10/14.0210250213 



its acceptance 
integrated 



02/10/14 
IS/OH 247 



e2tO22036S Forwards safety evaluation of MJRCG-0737. I turn 1 1 
"Containment Isolation Dependdb i I i ty " Facility meets 
guidance Item resolved 

CRUTCHFIELD, D Operating Reactors Branch 5 O2/IO/10 
VANDEHALLE, D Consumers Power Co 5pp 15/79 IB 1 ? MY. 
Fiche 30-153, B2/10/IB, 0210320360 



0210260323 Forward) Amenil 54 to License DPD-6, safety evaluation lr 
notice of ncuance ! availability Amend approves Tech bpec 
changes re NUREQ-0737. Item [I F 1(3) on leal testing 
intervals 

CRUKHFIELD, C Dperatinj Reactors Branch 'j 02/10/lB 
VAHDEHALLE.D J Consumers Power Co Ip 1 57vO OiO 24X 
Fiche 50-155. 02/IO/lfi. B2ID25O323 

92103503^7 Amend 34 to License DPR-i. chang i ng Tech Specs re cantainnFiil 
high radiation monitor requirement by TMI Action Item 
II F t(3) on leal testinq intervals 

CRUrcHFIELD, D Operat ing Rear tors Branch 5 32/10/10 IDpp 
15790 Oil 24X Fiche 50-155. B2/IO/ 18, BJ[ 02503^3 

--921O250333 Safety evaluation supporting Amend 54 to License DfR-i, 
Office of Nuclear Reactor Regulation, Director (32/10/111 Jpp 
15790 021 24X Tithe 50-155.82/10/18,6210250323 

8210250337 Notice of issuance !. availability of Amend 54 to LuBiist 
OPR-4 

CHUrCHFlELD,!) Operating Reactors Branch 5 02/10/10 3p p 
15790 034 24X Fiche 50-135,02/10/1810210250323 



S2I013032& Cnmment* on propoad scDpe o* Phase 111 of SEP at reflected 
tn indivlrfual tropic definitioni ajpended to H20909 Itr 
Staff encouraged to ifovaiop & Implement msans- to Incorporate 
poiitlv* ittrlbutei of Phase Itl in I Ic rnse e/MRC interface 
KACICH,R H B-p OtuneTi Croup KACtCII. R M Northeast KueUar Energy 
Co 4uli4 of Northeast Utilities) S2/IO/07 EISENHUT, D 
Division of Uctnitng ?PP I SASS 179 24X Flchs 5O-000, Bff/IO/07, 
82IOI3032& 

82101S050S Advili of FranHin Research Cfcr BS043O technical 
evaluation rapt, "Containment Leakaoe Rabe Te,stira-(A 041." 
Eiemptions for initrument preitUTe- Unas should te granted 
Wo significant dearadatlon of panetrfltion seals observed 
DOHDIHE.TC Carolina Power t. Light Co 82/10/13 CHUTCHFIELD- D 
Operating Reacton Branch 5, Set 15714 2 IO 24X 
Fuhe SO-I&3, 83/10/13. 8210150303 

S2IOl?Q'!59 forward* curratlE status of projiroin to evaluate adequacy of 
overload ( *hoirt-clr(u i t protection *<ir alctrl<al circuit! 
that p through reactor containment p-ef SEP Topic VIIf-4 
"Elsctri^al Penetrations of Reactor Containment." 

TOMES. K A Consumer* Pownr Co BH/IO/12- CRUTCHFIELD, D Oparatinfl 
Rejctors Branch 9 2IpP 19740 26B 24K Fiehe 50-000, B2./10/12. 
BB10190-1S9 

8210300041 Forward* afety evaluation of SEP Topic IX-3, "Ventilation 
S>ft " Evaluation uill bi basic input ta inte<grat*d safety 
aiitisreent Aim forwards "Rgvlew aP Pe*lgn It Dpiration of 
Ventilation Syi For SEP Plants," technical evaluation rept 
CRUTCHFIELD, D Operating Reactor* Dranch S NRC-03-79-UB 
B3/10/1K VflNUEHftULKi J Consumeri Pou>r Co 9pp 19735; 3 SB 
24.X Flch* 50-159. B2/10/I8, 8210200041, 

B2QB18QOS2, "R'tvleu of D*lgn b Operation of Ventilation B?* for SEP 
Plants," final technical evaluation rept 

HERR10ri,R.C Franklin Intlt-utB/FrnklIn Reie-rch Centrr 
NftO-jOa-79-tIB. TER-C52S7-4I4 B2/03/I3 BBOWN, 3 NRC - No 

, Olt'll Affiliation Oivenj, Slpp 15756 009 24K 



6210220117 Foruarils CE turbine hydraulic control lever Diagram 
21273I6-A (ALTO).r>q,uestad t>(j Power Si(> Branch during 821013 
conference rail per SEP Topic I II-4 B, "Tirroinc Missiles " 
TDMEfJ.K A Consumers Pouer Co 92/1O/I9 CRUTCHFIELD, D Operating 
Reactors Branch 3 2pp 15770 147 B4X Fiche 50- 15S, 02/10/ IV. 
8210220117 

8210E70370 Foruiards draft tafetit evaluation of SEP Topics III-6> 

"Seismic Design Considerations" & III-ll. "Component 
Integrity " Lieiima analyses of struc tures- hurl Bd piping & 
reactor coolant loop piping inadequate 

CHUTCHFIELD.D Operating Reactors Dranch 5 03/10/19 

VANDEHALLE. D Consumers pouer Co 3ipp 15852 04E1 24X 
Ficfie 50-153, 83/10/19,8210270270 

8208110271 Foruarifi geotechnlcal review of leismic safutg margin 'lull 
In response to virbal request during 620534 meeting Range of 
10! I shear moduli values used in parametric study by 
licensee adequately envelope expected values 

LEAR<0 Hydrologic & Gen technical Engineering Dranch B2/07/30 
RUSSELL, M T SylteiMtic Evaluation Program Branch lOpp 
15B52 108 24X Fiche SO-I35, B3/10/I9, B31027027O 

9303230010 Foruards "seismic Revivui of Rig Rock Point Nuclear Payer 
Plant Containment Shell Strui ture, as Part of SEP " 
LO, T Llurnce Livermore Lahoratory FIM A-O43i Q2/05/2O 
RUB9ELL,H T Syitematic Evaluation Program Drflnch Ip 
15838 11B 24X FIch 50-155,82/10/19,6210270270 

BSO-3290020 "BismU Review of Big Roc* Point Nuclear Power Planti 
Containment Shell Structure, s Part of SEP " 

LIAMiC V goto, Inc FIN A-0436 SBO-307 B2/04/30 NHC -Hi 

Di-tUed AfFillation Qiven SBpp 15032 119 34 X 
Fiche 80-133,82/10/19,0210370370 

82102702B8 "Selsmlt Desion. " informal ttchnical evaluation npt 
CALL, v 9.1 THOMPSON, t R K0t,0, Inc FIN A-o424 EOO-EA-60S1 
82/99/30 HERRINQ.K Diviiion of Licensing S2pp tSBSS 146 
24X FUfit 30-198,82/10/19,8210270270 



DOCKETED ITEMS 



3210250310 Forwards safety evaluation of SEP Topic XV-19, 
....clients Resulting From Spectrum of Postulated Piping 
Breaks Within RCPB (Rad 10 lagi ca 1 ) " Facility meets 
ate e a tape e criteria 

CrtuTCHFlELD, 1> Operating Rejctors Branch 5 13/10/20 
WUPEWALLE, D J Consumers Pomer Co lOpp 15770 033 
Fiche 50-J55. B3/10/20 921OS503IO 



5 Reportable occurrencei 



Delated correspondence 



3210060351 PNO- 1 1 1-83-099 on 820914, ABLB issued order delinoating 
rfef ic lends) In state otftite emerge ttL\) pre parerfness UtH 
given 1 month to domotiitra te deficiencies remedied 

PAGLIARO. J . AXELSON.H , PAFERrELUO. C Region 3, Office of Director 
Bi/09/20 Ip 1563B 11B 24X Fich* 50-1 55, 62/09/20, 021000035 1 



S210270263 Advises that NlWEG-0737, I terns II K 3 IB S. II K 3 45 ro 
autonatic dep i essur i lation sijs, inapp 1 1 cab 1 e to facility 
rfierefoi e. I terns resolved 

CJiUrCHFlELD. D PperJUng Reactors Branch 5 B2/10/20 
VHNDEUALUE. D Consumers Pouier Co flpp 1 5BS9 O43 24X 
Fitfie 50-155, 82/1O/30. 821O270265 



Inspection rppoi ts, IE Bulletins '' correspondence 



T Hearing transcripts on non-ant i trust matters 

6210590360 Forwards, signed original transcript of L Reiter deposition 
taken on B20917 W/o enc 1 

DACHHANN.fi Hearing Branch 1 62/10/39 OAL-LO, J laham. Lliieoli 
>, Qeate OALLO.J Consumers Pnuier Co Ip 13053 OB9 24X 
Fiche 50-155. 82/lO/28,021O2'?Q3fi0 



0^10050336 Acli receipt of B20 1 ?!? I tr informing NHC of seeps taleii to 
correct noncomcl lance noted in IE Insp Hept 50-155/B2-12 
SPESSAID.R L Division of Project >, riesidcnl Programs H2/O9/2-1 
DEIJllf.P. B Consumer? Power Co ID ISblO 098 SIX 
FichP 50-155, f!2/09/2fl.S3!005O336 

--62100503'12 Responds to NRC 82031? l*r ic noncomp 1 lance noted in IF Insp 
Rept 50-153/U2-12 Corrective actions unau thori i ed activity 
terninated on 920617, Fo 1 1 ouii ng reviobi bij operations 
super intend ent 

VANUEUrtLLE, D J Consumers Power Co B2/09/17 KEPPLER. J 
Region 3. Office of Director 3pp 15610 0*79 24X 
Fiche 30-155.03/09/24, Q21005O336 

3^10030279 Confirms commitment to incorporate responses to IE Insp Hept 
50-1 55/EJ1-I7 into emeigencg plan implementing procedures & 
requests approval to USD general oft control ctr as 
temporary emergency operations facility 

E. D J Consumers Pouer Co 02/10/01 KEPPLGR, J G Hogion 



3. Office of n lree t 01 - 



1563B 203 21X Ficho 50-155.83/10/01, 



IE Info Notice 80-35. Suppl 
Implant Deeds " Sue list ccl 
COHQ. L 1 Division of Fuel Facilities. Material 
63/10/06 Consolidated Edison Co of Neu Vort 

2'1X Fiche 50-000, S3/IO/06.B20Bl 1 i'02J3 



"Leaking t, Dislodgeif 1-125 



& Safeguards 
A6pp 19761 250 



so-140 OEIOROIA INQT OF TECH REBEMICH REACTOR 

Inspection reportti IE ftulletlne !. t orresp onitenc e 

6310320312 Act re-ceipt of 9.21004 1 tr informing fJfiC of steps taker, to 
correct violations noted in IE Inap Rept 9Q-160/B2-02 
VEHRELLI. D M Dlviflion of Project !. nemdent Programs B2/10/H 
CARLSON, WO Oe-orgla Institute of Technology Ip 15776 1(7 34X 
Fiche 50-160, Q3/1O/I4, 831O22O3I2 

0210220319 fimponJi to NBC 82Q9QB 1 tr rt violations noted in 1C Insp 
Rept 30-1AO/B2-O2 Corroctlvc actions personnel counseled 
RUSSELL. J L Georgia Institute of Technology 32/10/04 
yeRRELl.IiD M Division of Project fc Jlosiifont Programs 3pp 
15776 MB 34X Fiche 50- 160, 02/JO/I4, B2I O230312 

--G21022Q323 Foriuarda IE Ir>sp Rep t SO-160/B2-02 on 020025-26 * notttE 
of violation 

VERRELLI.D H Division of Project !. Resident programs 02/09/00 
DAVIS, M V Oaurgiji Institute of Te chnology Spp 19776 121 3 -IX 
Flche SO-160, S2/[O/14.D210S203ia 



-3210220330 Notice of violation from in9.fi on 020a25-2i 

* Division of Project & Resident Programs 03/09/08 Ip 
19776 123 24X Ficho 90-E60. B2/ 1O/1 4. 0210320312 



3310320233 Forwards evaluation of SCP Topic I 1 1-3 C, "Inserviee Insp of 
Water Conti ol "Structures " Insp prograrn needs mod to tonfnrra 
nj/Rcg Guide 1 127 

CFIUTCH--IEUO, D Clperatinj Reactort Branch 5 02/10/12 
VAIIDEWALUr. D J Consumers Poun-r Co Bpp 13775 104 24X 
Fiche 50-159, 92/10/1^.9310220233 



-B21022034I IE Imp Rapt 50-160/02-O? on 820EJ25-26 Noncoinp 1 lance 
noted on B2 05 1 3, i rrad latecT mat I re mo veil from biological 
shield penetration H-13 ui/g health pdys-ics supervision 
PEEHV, H W , BARfl. K Division of Project fc Resldont Programn 
BJ/09/07 -Ip 19776 124 24K Ficlie 90- 160, B2/10/ 14, B910 i aa031S 



"Itydrological Cons iileratione Inservice Insp of Water Control 
Structurag, (SEP. I I-3A. B, D I , C. I [ I-3D 1. " technical 
evaluation repl 

SCHERRER.J Frank 1m Institute/Franklin fiesoarch Center 
NHC-03 79-118 TEn-C52S7-542 82/04/23 BTALEV, NRC - No 
Detailed Affiliation Given ISpp 15775 112 24X 
FichP 50-155, S2/10/I2, B210220233 

300190230 IE Bulletin 02-03, "Stress Corrosion Cracking in Thlclt- 
Wfl 1 1, l.arge~Di ameter, Stainless Steel, lee ircu lation Kyi 
fjplng a*- BUR Plants " Svt H E t end 

DBYOUNQ.R C Director's Office. Dffica of Inspection anil 
HViTortement a2/10'14 Consol iriated Edl*on Co of NEUI York 

113pp 1S010 125 24X Fiche 50-000, E13/1Q/ 14, 920H19023B 

^10260220 AdvMBi that spiked air partlculste filter being forwarded 
to util for analysis, per H20429 discussion Utll results uilll 
<> compared u/NRC analysis, in effort to close out open item 
i n IE Insp Rept SO-1 S5/S2-Q7 

PAPERIELUO,C J Division of Emergemy Preparednsss 4 Operational 
Support 02/10/20 HOFFMAN. D P Consumers Power Co Ip 
1 SB04 217 24X Ficho 50-1 5S, 02/10/20, 8210260230 

?!O2o0315 Ack receipt of B21015 Itr Informing NRG of *tepi taken to 
correct violations noted in IE Imp Hept 30-153/92-09 
HaRELHIB.C E Division of Project & Resident Prngrami 02/10/33 
DEHITT, R Consumers Power Co Ip 15799 32B 24X 
Fiche 50-155, S3/IO/22, B21026031 5 

Bat03603l6 Reipondi to NRC 020917 Itr r violation! noted in IE Insp 
Rept SO-159/B2-0? Corrective actions training procedural k 
requirement* revised & luill be clarified bg 830101 
VAUDEWftLLE, I) J Consumer* Power Co 02/10/15 KEPPLEfi, J 
Region 3, Office of Director 6pp 1S799 329 24X 
Flche 50-195,02/10/22,8210360315 



DUCKET 50-170 NATIONAL NAVAl- MEDICAU CEHTER 
Adjudicatory corraap ondence 



0210050273 Order tchBduling B21013 prenearing conferenca in Bet hcada, Ml) 
re remaining outstanding issues Pi opposed schedule^ should be 
pretented 

HOVTiH F Atomic SaF-ety jnd Licensing Board Panel B2/10/01 Sjip 
IS609 191 24X FichD 50- 1 70, 02/10/01 , O21Q050373 

8210150317 Btcond nupp lemon tfl I respnnte to first set of 
interrogatories Certificate of 8vc o-ncl Related 
correspondent e 

MrtCKLIN.L Citiiens for Nuqlaar Reac tor Safeti/.Inc MACKUIM.L 
Initltute for Public Representation 82/10/00 49pp IS701 H70 
24X Fiche 30-170, B2/ 10/00, SSI 0130317 

8210IS0399 Provides info r counsel for Citiiens for Nuclear F) actor 
Safitg E Entuitle to continue as counsel L Hacklin <- tnit 
for Public Rp r*nta tion mill withdraw as couniel effective 
B21219, 

MACKLIH.L Intlfcut8 for Puhlic Konraienta tion MACKL1N, L 
Cltiien* fur Nuclnjr Reactor gafatu, tr-c 83/10/08 HOVT,H Atomic 
Saf>tg and Lionilng floird Panel Spp 19704 052 24X 
Fiche 90-170,98/10/00,0210130395 

8210220439 Faruarils motion for end protective order to protect against 
public discloiure or rnliutu of I StiMinan addrott ti 
telephone number 

HACKLIN'L Institute for Public fi*prsnt tion HACKLIN, L, 
Citiiens for Noclaar Reactor- Bifet.lnc 02/10/19 HOYT.H Atomic 
3f*tg and Ucninlng Board Panel if 15778 S3? 24X 
Fiche 30-170. 82/10/19. 0210230439, 

8210220448 Motion for protective order to protect againtt public 
disclosure or mlui of I Stillman tddraet b telephone 
number PropoitJ protective order fc CBrtific*te of Svc encl 
MACKLIMiL.M 8, Citiieni tar Nucltr Reactor Siffty.Inc 
MACKLIN.L, H, a, Intitut* for Public Rapr eientatinn 82/10/19. 
Atomic Safety and 1 Licensing Board Panel 5pp 15778 240 B4X 
Fiche B0-1 



18 



DOCKETED ITEMS 



9310250235 Order granting Cltiiens for Nuclear Reactor Safety 621019 
motion for protective order to protect againit public 
diitloiur* or misuse of I Stlllman address b telephone 
number 

HOVT.H F Atomic Safety and Licensing Board Panel 83/10/21 
Citiiens for Nuclear Reactor Safety, Inc Ip 13780 397 S4X 
Fjcne 30-170, 92/10/21. 6310250333 

9210360330 Provide! date) when Citlieni for Nuclear Reactor Safety 
would be available for plant tour 

HACKUM, L Inititute far Public Represents tion MACKL1N.L 
Citueni lot Nuclear Reactor Safety. Inc 53/10/31 HOYT, H At omit 
Satft<i and Licensing Board Panel 2pp 15837 007 24X 
Fiche 50-170.83/10/31.8210280220 



DOCKET 50-186 UNIV OF MISSOURI RESEARCH REALTOR 

Inspection reports. IF Bulletin* t> correspondence 

8210050339 Forwards IE Insp Rept 50-I06/B2-Q1 on B20B16-17 & notitc of 
violation 
MILLER, JR Division of Engineering 4 Technical Programs IJJJ/O7/ 1 5 

AUGER, D H Missouri. Univ of, Columbia 2ap 1560900] .'MX 
Fiche 50-186,82/09/15,8310030359 

--8210050365 Notice of violation from (rap on B20B16-17 

MILLERiJ R Division of Engineering 4 Technical Progiams 

82/09/15 2pp 13609 003 24X Flche SO-106, 82/09/1 3, DaiOO'lO !*>'/ 



9210260423 First supp lementary answers to interrogator in Certificate 
of Eve eni 1 

BICKARD.D C Armed Forces Radl ob iolooical Research Institute 
B3/10/22 Citiiens for Nuclear Reactor Safety, Inc I2pp 

1S8O6 038 24* Fichu 50-170,82/10/32,62(0240425 



H General corr espondenci 



-8310050380 IE Insp Rept 50-186/83-01 on B2QBI6-17 None ompl ianro 
noted failure to par form lurveys, to jiosc radlflllun (. 
radioactive matls area !< storage of raduiaite at unauthDPi i o d 
offsl te facility 

LQYENDALE.P C , GRANT, H G , GRCGFR, L It Division of Cng Ittutir nit) 
Technical Programs B2/09/M Bpp 15609 005 34X 
Fithe 50-1B6. 82/09/15,0210050359 



8210150200 Notice af change of addresi 

ENTWISLE.E B Citiieni for Nuclear Reactor Safety. Inc 
ENTHIBLE.E B EntuisU.E B 85/10/08 Ip 1S701 362 
Fiche 30-170. B2/10/08, B3I0150200 



T Hearing transcripts on non-ant I truit matter! 



B310190238 Transcript of 831015 prehearing conference re licenii 
rentuals in Dethesda, MD Pp 653-^38 

Atomic Safety and Llcenting Board Pinel 63/10/15 87pp 
15713 230 24X Fiche 50-170,82/10/15,8210190239 



DOCKET 50-iea PURDUE UNIV RESEARCH HEACTDH 

P Operating license stage documenti & correspondence 



8210050540 Foruardi flmend 6 to License R-B7 & afetu evaluation Amend 
changei Ttch Specs re drop tiraei of shim safetg rods & time 
intervals bettugen meetingi or turveillance action 
THni-WS.C Btandarduation d Special Projects Branch B2/09/13 
8TA^^BERR.E H Purdue Univ 3pp 15637 204 34X 
Fiche 30-192, 83/09/13, 6210030340 



DOCKET 50-1BS KANSAS STATE UNIV RESEARCH REACTOR 

R Periodic operating reports i. related correspondence 

8310190365 Submits list of facility nroceduro changes, tea U t, 
eiperiments for Oc t l9B|-Sflpt I9fl2,per IQCFRSQ 39<b) 

FAU.fi E Kansas State Unlv 82/10/11 MILLER, J R Staniifli d i rut ti 
I, Special Projects Branch 2pp 15/40 316 24X 
Fiche 30-168, B2/10/11, 8210190365 



DOCKET 50-192 UNIV OF TEXAS RESEARCH REACTOI] 

P Operating llcenie stage documents t corres pundonce 

0310050174 Forwards description of mods to be mado to reactor 
instrumentation !< control sgs Changes will moderniie 
function or reliability nf currant console functions Phaio 
I. Parts A d D of changes completed 

BAUER, T L Teias, Unlv of B2/07/30 KUNNICUTT Region 4, 
of Director 14pp 15604 121 2flX Tiche 50-193, H2/07/30, 
8210030174 



-8210030343 Amend 6 to License R-B7. changing Tech Spec limits on drop 
times of shim safetu rods i, changing certain surveillance 
intervals 

THOMAS, C D Standardiiatlon f, Special Projects Branch 62/09/13 
Uflp 15637 206 34X Firhe 50-103,82/09/13.8210050540 

-8210050548 Eafetu evaluation lupportlng Amend 6 to License FI-0/ 

Dfficn of Nuclear Riactor Regulation, Director 02/09/13 3pn 
IS437 317 34X Fiche 50-182,62/09/13,8210050540 



DOCKET 50-164 NATIONAL BUREAU OF STANDARDS HEACTOR 
Inspection reportu IE Bulletins 1 correspondence 

B210S90300 Foruiards IE Insp Rept 30-I84/B3-08 on 820900-10 & notice 
of violation 

STAROaTECKI.H Dlvi.ion of Project & Reiident Programs 83/10/09 
CARTER.R B Commerce, Dept. of, National Bureau of Standard* 3pp 
1SBBS 036 24X Fiche 90-184, 82/10/08, 8310290300 



DOCKET 50-199 MANHATTAN COLLEGE RESEARCH REACTOR 

P Operating license stage documents t, correspondence 

0210050341 Requests guidance on procedure for renewal of 10-yr I Urns* 
R-94.uihlth expires on 630930 

KANE. R S Manhattan College B2/09/S3 BERNARD,!! Standard | , at I rn 
fc Special Projects Branch Ip 13610 120 34X 
Fiche So-199. 62/09/28,8210050341 

8210260506 Responds to B2Q920 request for guidance In preparing 
application to renew license NRC evaluation! of recent 
application* end W/o end 



u-n 8t*ndardliation (. Special Project! Branch B3/1O/M 
KflNE, R 8 Menhittari College 2jip 15830 136 34X 
Flch* 90-199,83/10/14,8310360506 



DOCKET 50-201 WEST VALLEV REPRBCESSINO PLANT 
Adjudlcatoru correspondence 



8310390301 Notice of violation from insp on 820908-10 

Division of Project i. Rtiident Programs 82/10/00. Ip 
15835 036. 24)1 Fiche, 30-104, 82/10/08,8210290300 

8210290304 IE Imp R.pt SO-IB4/B 2 -03 on 630908-10 Woncomp 1 lane, noted' 
Failure to initrutt uiorler in precautioni, procedures, 
purpose t functioni of protective devices used to minimlie 
parsonal ciposur* to radioactive matl & radiation 

S " '* KEIM !2'SA, D ' V '" on of Fl -J ict * ""* Program, 
BB/09/3S 9pp 1S855'039 34X Fiche 50-184. B2/10/OB, 8310290300 

R^P.rionic operating reports I. related correspondence 



= P rw ; ri11 "Oprations Rept 33, Jan-June 1982," 
(.AER,R S Connerce, Dept of, National Bureau of Standards 

iD^ILa o*? MAS ;L D r, ";"" * Bp.ci.I Project. Branch 
lp 15673 066 2*X Fiche' 30-104. 83/09/30, B210130160. 



82102605BI Forwards NFS t NY State Energ* RW) Authorltu B30916 joint 
Itr notlfuing of B30916 settlement date Bettlemant satliPlet 
all three conditions of Paragraph B A of License CSF-1 for 
rrT n n I 1 "" ' NFS """'tV * fponsibilitg under license 
fci)OAH, L Morgan, Lewis i Docklui EDOAn,O L Nuclear FUB I 

Dlw,".,!!!' ^P i 9 r bS 'I S*!*" !' C ' 8WW1* CUNNINGHAM, H I. 
Division of Fuel Cgcle & Material Safety | p 13830 143 34/ 

Ficht. 30-301. 82/07/16,8210260581 

--82I0260SB2 Notifies of 020916 settlement date Settlement .atl.r.*i 
thri condition! of Paragraph B A of License C8F-1 for 
MCM n*A i0 V f " FS l au *i ( "' 1 * * "-Mponsibllitu under llc.n*., 
^? ^ ^* Y !;r' ri atf otl Ener V ih t, Development 
Administration DEU3TER,R H Nuclear Fuel Service,, Inc ( iwn 

Cuc?:W I' ? D ,' /W J* CUNNINOHAM.fi E D!V i n of rl 
Cycle I, Material Safetu, l p (SS30 144 24x 
Fiche 50-301, 82/09/16.8310360581 



"P r ' tl0 " 

* M * 
3pp. 



'P* 33, Jan-June 19BH 
j;?5 f( Nttiot l "TMU * Btand.rfl, 
67 S4X Fiche 30-184,82/09/30,8210130160 



DOCKETED ITEMS 



19 



8210070183 Informs that time for Commission to rev! eu ALAB-679 eipired 
Commission declined review Decision became final agency 
action on 921OOI 

CHILK S J Office of the Secretary of the Commission 82/10/O5 
OirUs of the Eiecutive Legal Director lp 15634 361 24 X 
Ficfm 50-201,03/10/05.9210070183 



8200170083 "Design Codes, Design Criteria i Loading Combinations 
(SEP. I1I-7D), " technical evaluation rent 

STILHELL, T C Franklin Institute/Franklin Research Center 
hFJC-03-79-llB TER-CS257-31B 02/08/13 PERSIWKO. D NRC ~ No 
Detailed Affiliation Given 223pp 15602 013 34X 
Fiche 30-206,82/09/51.9310050300 



Operating license stage di 



?spondence 



GEOMORPWC PROCESSES AND EVOLUTION DF BUTTERMILK VALLEV AND 
SELECTED TR IBUTARIES, WEST VALLEV, NCM YORK 

BDmhXQva.J C . TIMSCN. D S , DUNNE, L A New Yorfc, Stale of FIN 
B-6350 fJUREC/Cfi-2862 B3/07/31 Division of Health. Biting t, 

Environment l|7pp 157B5255 34X Ficho 50-2OI . 62/07/31. 
0210210041 



Forwards NFS fc NY State Energy R8.D Authority 820916 joint 
Itr notifying of 03071* settlement date Settlement satisfies 
all three conditions of Parajraph 1 A of License CSF-1 for 
termination of NFS authority & responsibility under license 
EDCAR.G L Morgan, Lewis 6 Hoctius EDGAR , G L Nuclear Fuel 
Services. Inc (subs Ot Getty Oil Co ) H2/09/16 CUNNINQHAM.H E 
Division of Fuel Cycla ( Material Safety tp 1 3B30 I A3 SAX 
Fiche 50-2O1. 02/09/16, 021O3605B1 

-&21O26Q5S3 Notifies of B20916 settlement date Settlement satisfies a 
t-hree conditions of Paragraph B A of License CSF-1 For 
termination of NFS authority It responsibility under license 
JACK.fi rt New York, State of, Energy Research t. Development 
Administration DEU5TER, R 14 Nuclear Fuel Services, Inc (suba 
of Cettn Oil Co ) 82/09/16 CUNN [NGHAM, R E Division af Fuel 
Cycle !, Material Safety lp 1 5B30 144 34X 
Fiche 50-201,82/09/16,8210360561 



0207300322 Draft "SEP Structural Review of San Onofre Unit 1 
Containment Structure Under Combined Loads " 

LO, T Laurence Livermnre Laboratory FIN A-0436 UCID-19141 
DfiFr 82/05/31 45PP 1S6Q2 331 24X Ficho 50-206,83/09/21, 
8210090300 

0210060003 Requests submlttal of fees for B30625 application for 
Amend 62 to License DPR-42, permi ttino, delay in safety 
injection ys hydraulic valve testing 

MILLER. W Licenne Feo Management Branch 82/09/23 DIETCH, n 
Southern California Edison CD lp 13636 266 24X 

Fiche 50-306,62/09/23,0210060003 

0310040062 Forward* safety evaluation rept d technical evaluation re 
main steam line treat w/contlnued reeduiater addition 
Analysis acceptable 

CRUTCHF1ELD.D Operating Reactors "ranch 5 82/09/37 DIETCH. R 
Southern California Edison CD 3pP 15534 170 24X 
Fiche 30-206, 02/09/27, 021Q010O62 

--8210040064 Safety evaluation re main steam line break u/conti nued 
Pefduater addition Licensee commitment acceptable 
tu/lnstallat Ion of auxiliary faeduater motor driven pump 
u/pump runout protection 

* Office of Nuclear Reactor Regulation, Director B2/09/E7 7pp 
15S94 100 24X Fiche 50-206,03/09/27,6210040062 



riOISQ411 Notification of contract elocution , Mod 4 to "West Valley 
Wa-ste Burial " Contractor State Univ of NY, Albany 
JACOHS,A flesearch Contracts Branch FIN B-6350 62/09/26 
QATSOM.H , NICHOLSON, J Office of Nuclear Regulatory Research, 
Director Jp 15745 375 34X Fune 50-201,82/09/26,0310100414 

-Q3KHH0419 Hod 4. eitending period of performance to 031331 to "Heat 
Val Letj Hast e Burial " 

HASHER, a J Naiu >ork, State of QUSTrtvE.R p Division of 
Contracts FIN B-6350 82/07/26 13pp 13745 376 34X 

Fiche 5O-2OI, 03/09/26. 0310180414 



OCKET 50-206 SAN DNQFflE NUCLEAR STATION, UNIT 1 

Security, medical, emergency & fire protection plans 

HlOOa0310 Acle receipt of 820910 Itr informing NfiC of steps taken to 
correct violations noted in IE Insp Ropt 50-30i/B2-21 
B[SHOP, T W Division of Resident, Reactoi Project & Engineering 
Programs 82/10/04 FOGADTY, D J Southern California Edison Co 
lp 15640 OfiO 24X Fiche 50-206, B3/ 10/O4, 82100B0210 

-B2IOOB0211 Responds to NRC B20B12 I tr re violations noted in IE Insp 
Rept 30-206/82-31 Corrective actions nonfire retorilant luoodj 
oily rags >j combustible debris removed from areas & amend to 
Include emergency light impairment prepared 
FOGARTY.D J Southern California Edison Co B3/09/10 
ENGELKEN. R H Region 5, Office of Diractor 5pp 15640 OBI 24X 
FitJie 50-206,82/10/01,8210080210 

?L 0190625 Foruarili Revision 7 to physical security plan Revision 
withheld <ref 10CFR73 21 I 
PASKIIt. K P Southern California Edison Co 82/10/15 EIBENHUT.D 

Office of Nuclear Reactor Regulation, Director !p 13740 039 
24X Fiche 30-206,82/10/15,0210190435 

Operating license stage documents t- corru t pondsnce 

'10iaQ013 Re#pondi to F01A request for all 1 ntlrnal. non-pub 1 it 
doc umen tir menos, evaluatl on repts & other matl dealing u/ 
nuclear plant operations Foruiards documenbl listed in App A 
FECTON. J H Oivlslon of Rules and Rvcordi 83/09/17 MC INN 1 3-D 
Nw* A Observer Spp 15860 0*S 21X Fiche 50-000,82/09/17, 
aa I OS900 13 

8B102BOOB2 "Daslmetru Placement for Steam Oenerator Markers " 
UA.RWOCK,R Institute of Nuclear Power Operations 02/01/31 
13pp 138iO 310 24X Fiche 30-000i 02/09/17, 8210800013 



B306030064 "PUR Main Steam Line Break W/Continued Feediuater Addition, 
technical evaluation rept 

VOSBURY.F H Franklin Insti t i/te/Frantl in Research Center 
NRC-03-B1-130 TER-CS5O6-131 82/05/26 HEARN, P NRC - No 
Detailed Affiliation Owen HSpp ISSBf 187 24X 
Fiche 50-306, 83/09/27, B31004OC-62 

0210040153 Advises that util proposed masonry mall test program 
ace eptabl e, sub j to satisfactory resolution of concerns 
delineated in enc 1 evaluation Add! info requested no later 
than 30 days prior to proposed restart date 

PAUL90N.U Operating Reactor* Branch 5 82/09/29 DIETCH. R 
Southern California Edison Co App 1SSB2 341 24X 
Fiche 50-206,82/09/29,9310040153 

8310040177 Foruardi "Seismic Evaluation of Reinforced Concrete Masonry 
Main, San Onofre Unit 1." Vol 5 Fuel Storage BIdg Soil 
Dae I Flit Condition Evaluation, per SEP Topic in-6Noaddl 
mods required to fuel storage bldg 

BA8KIN.K P Southern California Edison Co B2/09/3D 
CRUTCHFIELOi D Operating Reactors Dranch S lp 15563 045 24X 
Fiche 50-206. 82/09/30,0310040177 

B21004017B "Seismic Evaluation of Reinforced Concrete Masonry Halls, 
San Onofra Unit 1> " Vol 5 Fuel Storage Cldg Soil Backfill 
Condition Evaluation 

* Computech Engineering Services. Inc RS43-03 V05 02/09/30 
159pp 15302 046 24X Ficbe 50-506,82/09/30,0210040177 

0310130276 Forwards abstract of paper on eipenence gained in 
evaluating effect* of high energg line breaks at facility 
Paper will be presented at ASHE Pressure Vessel tc Piping Div 
$ Analysis Committee 4th Natl Congress 

OASKIK'K P Southern California Edison Co 02/10/04 CHEN, P MftC 
- No Detailed Affiliation Given 2fp 19678 165 24 X 
Fiche 30-206. 03/10/04,8210130276 

8210360249 Provide* addl tnfo supporting B20923 position that no fees 
are required for Amanif 62 issued 820623 Surveillance program 
previously submitted w/Amend 57 For uhlch appropriate fees 
applied 

BA8KIN.K P Southern California Edison Co 02/10/04 MILLER.M 
LUenO Fee Management Branch tp 19779:353 24X 
Fiche 50-206.82/10/04,0210260249 

0210070082 Dlscuisei use -of raduraste tol Idif I cation syi Unit 3 license 
condition does not prevent utll from using Chem-Nuclaar Sijsi 
Inc prociis to solidify ujet solid raduaste produced at Unit 
1 Baftv evaluation mill be performed 
OASKIM.K P Southern California EdUon Co B2/10/03 
CRUTCHFIELD, D Operating Reactor* Branch 5 2pp 13623 162, 21 X 
Fiche 90-206. 82/10/O3, B2100700B2 



'10050300 Forwards draft evaluation of SEP Topic IH-7 D. "Design 

Codes, Design Criteria t Load Combinations " Response to 

factual carre'c tness of SER t, proposed schedule for 

roioluti-an of open items requested uilthln 30 day> 

PAULSDN, H Operating Reactors Branch 5 02/09/21 DIETCH.fi 

Southern California Edison Co 1 Ipp 15603 001 24X 

FlcJie 50-20fi. 02/09/31,8210030300 



0210080093 Informs that crane opera ttnfli maint !i imp procedure* 
Implemented on 821001 p.r S20704 Itn insuring complianc* 
w/NUREO-0412 Cost & implemontat Ion schedule of Items 1'3 to 
be campleted by 921215 du* to vendor delays 
KRIEOERiR H Southern California EdUon Co 02/10/09 
CRUTCHFIELD, D Operating Ractor Branch S lp 15640 S36 H4X 
Fiche 30-206.82/10/05,8210080093 



20 



DOCKETED ITEMS 



3210130086 Responds to 330853 ] tr requesting info re SEP Topics [1 1-2 (, 
III-* & "Wind (a Tornado" b uithhplfl Bequest cannot be 
approved until appropriate affidavit submitted 

CRUTCHF1ELD. D Operating Reactor* Branch 5 B2/1O/05 D1ETCH. R 
Southern California Edison Co 2op 15473 134 24X 

Fiche 3Q-2O4.. 82/10/03, 62ioi3QOBa 

6310180070 Forward! Amend 64 to License DPJi-13. laf ely evaluation t 
notice of issuance ( availability Amend revl-sei flop A Tech 
Specs ti basoi to reflect revised time intervals for 
entering various subcntlcal modes 

CRUTCHF1ELD. D Operating Reactors Branch 5 82/10/06 DIETCH. R 
Southern California Cdnon Co 3pp 15719 351 S4X 
Fiche 50-2Q6. 02X10/06, 82101 B0070 

921018-0073 Aiiend 64 to License DPR-13, revls ing App A Tech Spec; & base 
to reflect revised tims intervals (or enti ing various 
luhcr itlc a 1 operational modes when limiting c and it! on cannot 
be satisfied 

CRUTCHFIELD, D Operating Reactors Branch 5 B2/IO/06 7p p 
1571? 354 24X Ficfie 3O-O<b, 92/10/06. B3J 01 30070 

82I01BOO76 Safety evaluation supporting Amend t4 to Utcense BPH-13 
' Office of Nuclear Reactor Regulation, Director Ba/lO/OA Jpp 
15719 341 34X Fiche 50-506. B2/ 10/06, B3 1QIBOO70 

B210IB007 1 ? Hotice of issuance t. availability of Ameno 64 to License 
DPH-13 

CfiUTCHFIELD, D Operating Reactors Branch S 82/10/0,6 3p p 
I572Q OQl 34X Fiche 50-BQA, 63/10/06,831 OIBOO70 



B210260273 Request* addl time to complete proposed Tech Specs 
containment leakage t es t ing, ref I ec 1 1 ng App Jof 10CFRSO, as 
requested in NRC G2OB03 ILr Proposed Tech Specs gupected to 
be submitted by 321 130 

KRIEQER.R U Southern California Edison Cg B2/IQ/IS 
CRUTCHPIELD. D Opeiating HeaLtors Branch 5 lp I5B01 331 
Fiche 50-204,82/10/15,631034.0272 



B2I0260239 Forwards request far add) info to assist in NRC reviPu at 
SEP Topic 11-1 F, "Be-ttiement of Foundations t, Buried 
Equipment " Revised SAR incorporating appropriate revisions 
re soil conditions should be submitted 

CHUTCHFIELD, D Operating Reactors Branch 5 B2/IO/1B nlETCH.lt 
Southern California Edison Co 9pp 1 5799 139 <34X 

Fiche 50-20-tj, B2/10/IB. B210360229 

8210260450 Forwards "Status of Category A Unresolved Safely Issuoi .] I 
San Onofru Nuclear Generating Station Unit I " Replr provides 
descr la ti on. of eacJi issue ie rf i icusiion nf NRC generic bases 
for continued operation * site specific con s i ilerat i ana 
MEDFQHD.H O Southern California Ediaon Co 63/10/20 
CRUTCHFIE4.D, D Operating Reactors Branch 5 40pp ISfiufc 155 ,M 

Fiche 50-206,62/10/20,0210260450 

S2l02i0472 Forwards Bupp 1 Bfnonlal info rept re NUREG-Oiia. "Cantrnl at 
Haavii Loads- at Nuclear Pogier Plants " Rept contains 
coFirnitments requiring changes to crane operating procedures 
to be implemented b i| [33-01 15 

DASKIN,H P Southern California Edison CD 63/10/21 
CRUTCHFIELD, D Operating Reactors Branch 5 lp I5g07 230 ?1K 

Fiche 50-20&. 63/10/21. B2IQ2A0472 



G310130326 Comminti an jiropoEed scope of Phase III o( fcEP as reflected 
in individual topic definition* appended to 920909 Itr 
Staff encourageil to develop t implement means to Incorporate 
positive attributes of Phase III in licensee/NFIC interface 
KACICH.Fi M SEP Owners Group 83/10/07 EISENHUT.D O Division of 
Licenaina 7pp 136B2 17=7 24X Fiche 50-000,82/10/07,8310130336 



9210100065 Clarifies NflC 830630 request for addl Info ft 
II B 3i "Past-Accident Samp ling Sgs " 

CRWTGHF1ELD-D Operatinj Reactors Hrancfi 5 62/10/07 
Southern California Edison Co- 3pp 15730 007 24X 
FicNe SO-2O6, 63/10/07, B2IOIB0065 



TMI Item 



B210260477 "Control af Heav-j Loads, San Onofre Nuclear Gencrat ills 
Station Unit 1," supplemental info i-ept 

-" Southern California Edison Co B2/1O/31 22p p 1 5007 3H 

24X Fiche SO-EOoi. B3/10/21 , B51026O473 



0210390169 Foruiarbs Ameni) 65 to License DPR-1 3. safety evaluation b 
notice of issuance & aval lau 1 1 1 ti| Amend incorporates 
NUREG-0737, Item Ii E I 1 , " Au* 1 1 lari, Feedua ter Pump 5 t, 
Valves" Into Tech Spe-ca 

CBUTCHFIELD. D Operating Reactors Branch 5 B2/1O/22 DIETCH, (1 
Southern California Ediaon Co 3pp 15351 IB1 24X 

Fiche 50-206,03/10/22,9210290169 



B21 02^02 H Advises that final evaluation to determine applicability 
ot EPH I program test results, for power operated relief 
val wet i >af ety valves I bl ock va Ives, per TMI Item II D t , mill 
be sent by 621130 Delau, due to n-ced for addl analyst)) 
KR[EOER,R H Southsrn California Eifison Co 8?/IO/OB 
CRUTCHFIELD, D Operating ReacUrt Branch 5 lp 1SGO* 265 24K 
Ficne 50-206. 92/10/09, B21026.Q2I 4 

S210150144 Submits updated icheiiules re NUREG-0737. Items 1 1 E 1 a, 
"AuMiliarij Fee-duster Initiation iFlqu Indication," 
I ft 1 3 1. "Limit Overtime," II fi i, "Performance Testing 
o-t PHfl RalLf & SaFetq Valvei" t III D 3 4 
BAgKIH.A P Southern California Erfiton Co 82/lO/la 
CflUTCHFtELD, D Cper-ating Reactors Oranch 9 3pp. 19697292! S4X 
Fiche SO-E06, B3/ 10/13, B21O1 BOI44 



8210290175 Amsnd 65 to License DPR- 13. me orpnrati ng NUHEC-0737, Urm 
II E 1 1, "AuJiiliaTu Feeduiater Pumps b Valves" into Tech 
Specs 

CRUrCHFICLIh D Operating Reactors Branch S 92/10/22 5p p 
15934 192 24X Fiche 30-206,02/10/22,9210290169 

9210290130 Safety evaluation supporting Amend 65 to License tll'lt L'3 
* Office o-f Nuclear Reactor Regulation. Director 02/lO/ay 
ISpp ]SB5a 197 24X Fiche SO-2O6, 82/10/23, 



-82102901B3 Notice of Issuance t availability of Amend. 63 to I ii 
DPR- 13 

CRUTCHFIELO.D Op erating Beat tor s Branch 5 8Sf IO/3B 3|ip 
I5BS4 212 24X Fiche 50-306, 92/ I 0/S2. B210290I67 



B2 1 0200033 Forwards draft evaluation of SEP Topic II 1-4 Ci "Intarnallij 
Centra tad Kliilii " Facility adeq.uatelij protected from 
internally genarated mitslea 

PAULSON, H Operating Rsacton Branch 3 82/10/12 DIETCHi ft 
South rn California Edlsotl Co 33pp 13797 530 24X 
Flcht 50-306, 82/10/12,8210200023 

B2101S0298 Motif Ication of B2102I meafcing ui/util at plant lite bo 
difcuis soil parameters re siiintlc re-evaluation per SEP 
Topics II1-& (. 11-4 1 
PAUL9DN.W A Opfrailng Reactors BrantJi 3 8E/IO/13 CRUTCHFIELD, D 

dp (rating Reactors nnnch S app 15706 133 24X 
Fiche SQ-2O6, B2/ 10V 13, 821015027B 

S210170417I Bummaru of 921001 meeting w/util in D*theda,MD re scope of 
tii-mit rv-evalvation program AiTdl info re vent itcl, 
electrical equipment & instrument supports required 
PAULBON.H A Operating Hoatton Branch 5 ez/10/13 Opratina 

Reictor* Branch 8 Spp IS737 EflH S4K Flch* 50-306,83/10/13, 
B210190&71 

B2l02fiO"HS Adylis* that s*F etij-grada replacem>nti for commercial grade 
jir.ietBT *< traniducir hava bn received & uilll be init*lUd 
pi-tor to rfturn to pauar from current outflg* Upgradei 
cc-mplete ncirv coirtpl lanc ui/NUREO-0737 r I tim II E 1 2 
HABKIN.K. P Southern Caflfornla Edtson Co 83/IO/H 
CfiUTCHFIELO, D Operating Reattori Branch S lp, 13806 134, 24X 
Fiche- 50-ZQ6, 82/!0/14,82[02A041S 



Inspection reports. IE Bulletins t< correspondence 

B210010009 Rsiaonds to FOIA requeit for 19 categories of document* r 
nuclear reactor events ?, safety problems Forwards document* 

listed in App A 

FELTON.J H Division of Rules anrf Records B2/0&/2B UDCLL.B A 
Critical Man Enerav Project I5pp 15727 005 24V 
Flclie 50-000.82/06/28,8210010006 

6111191042 Camments on draft IE circular re MSIV failure! to {love 
Problem u/cnntrol air for MEIV may be part of larger 
spectrum of problems for many valves 

MICHELEQN, C Director'* Office 81/10/01 JDRCAN.E L Dlvlilur. 
at Resident k Regional Reactor Inspection lp 15730 339 4* 
Fiche 90-000, B2/0>/aa,a2 10010008 

0310070007 Repond to FOIA request fr eight categories of record r 
steam generators t< steam turbines Ap(i A documents provided 
in R Ud<ll FDtA Rnuest B1-3I3 Foruiai-ds documents lilted in 
App D 

PELTOH, J M Division af RuUs and Records B2/OB/1O LONO, D J 
Hinthrop, Stlmion, Putnam & Roberta <?pp 1SM5 063 21 X 
Ficht 90-OOOj 0B/09/10, B210O70007 

8210070139 F-oruiards tabulated data on steam generator insp If nilnt *1 
facllltfn Data ihould be provided to licensees 
IPPOLITD.T Operating Realtor* Assessment Branch 82/04/01 
VAROA,S Operating Reac tnr, Dr^nc-h 1 CLARK. R Operating 
Rtactori Branch 3 STOLZ.J Operating Reactors Dranch 4 Spp 
15643 131 24X Ficho 30-000, S2/O8/10, 9210070007 



DOCKETED ITEMS 



21 



S2JOO7O172 Forwards info re steam generator integrity ! insps at all 
operating PWRs. per 750320 d 21 requests Details of insps, 
including defect ind I ca t ions, tube plugging criteria & tubes 
plugged uill not be provided eicept for Point Death 1 
GDLLER H R Division of Reactor Licensing (NRR-I97S only) 
75/Q3/24 HACCARY,fi R Division o^ Technical Review <NHR-1975 
only! 5pp 15645 C76 24X Fiche 50-000. 82/O8/ 10, 821007OOO7 

:iOCiO2fa4 Forwards IE Insp R B j>t 50-206/B2-24 on 820802-31 No 
nanconpl lance noted 

BISHDPiT U Division or Resident, Reactor Project '. Engineering 
Pregrans B2/O9/17 PAPAY.L T Southern California Edlaon Co 
-PO ISil? 307 24* FlcHe 50-206,82/09/17,8210060264 

-821006026'? IE Insp Refit 50-206/82-24 on B2OBO2-3I No none omp I lance 
no t ed Ma j or areas inspec*ed plant operations during 
long-term s hutdoun, annua I review of plant operal t ons, month I y 
.ltd ml S surveillance activities & LER follouup 

I-11LLER L KIRSCH.D F Division of Resident, Reactor Project t 
engineering Prograns 02/09/16 6pp 15^19311 34X 
Fit he 5O-206. B2/Q1/I7. B210060264 

:iOO6O29'l Foriuards IE Insp Kept 50-206/S2-25 on B20B30-O9Q3 No 
nancopipliaoce noted 

BISHOP, T H Division of Resident, Reactor Project *. Engineering 
Programs 82/09/21 PAPAY.L T Southern California Edison Lo 
Spa 15619 223 24x Fichc 30-206, S2/O9/2I , 83I006O294 



Z99 IE Insp fiept 3O-306/82-25 on B20830-O9O3 No noncompl lante 

ui/seismn upgrading 01 sflfe ty-rel a t ed structures te supports 
WAGhcllpU J ZHETZ!G,G B Division of Resident, Reactor Project i. 
Engineering Programs B2/09/I7 5pp 15619 335 24X 
Fichu SO-206, B2/09/.2I, 8210060394 

'IO190232 A<- k receipt of payment of civil penalties imposed on S2GB1I 
Pi sposed corrective action mill be examined in future Insp 
,,<ElRAD,J f\ Enforcement Staff B2/O9/22 PAPAY, L T Southern 
ralitornia Em ion Co 2p p I575B 175 21 X Fiche 50-206,05/09/22, 
2 10190^32 

1001004; 1 Confirms 02102! r"9t meeting in Rosemeaif.CA to discuss 
M i( s tend ' i L assessment of licensee performance Anticipated 
mealing att-endees ( agenda encl 

CKEW3.J L Division of Resident: Reactor Project (. Engineering 
Programs O2/O9/27 PAPAY, L T Southern California Eldison Co 
Hpp 15ba5 317 SIX Fiche SO-206: B2/09/27, 0210010043 

iO?50302 Foruards info per Hem 3 of IE Oullctin 62-02, "Degradation 
or Threaded Fasteners in RCPD of PUR Plants " Rflpts retired 
b-j Item 'I uill be suUnitted uitMin 90 days of outage 

HrtrNCb. J G Southern California Ediaon Co S2/10/O1 CNGELKCN.R H 

Regior ), Orfne of Oiroclor 5pp 1 S790 200 24X 
hiche 5O-206. 82/10/01,8210250302 

'101BU2JO nctt receipt of 820910 Itr informing NRC of steps taken to 
correct .-mlations no'ed in IE Insp Rept 9Q-206/B2-2I 
DITiHDP. T W Division of Resident, Reactor Project Ji Engineering 
Prograna B2/IO/04 FOGARTV. D J Southern California Edison Co 
Ip 15640 OBO 24X Fiche 5O-206, S2/ 10/04, B2100B0210 

B?100a3211 DespnnJs to NRC Q208I2 Itr re violations noted in It Insp 
Rept 5G-2iJt'/63-3l Corrective actions nonfiro retardant uiood, 
o 1 1 1,1 rags i. combustible debris removed from areas d amend to 
include emergency light impairment prepared 
FDCAHTV J Southern California Edison Co S2/09/10 
fNOElKCW.R H Region 5, Office of Director 5pp 15640 OBI 21X 
Fiche 30-206, B2/10/04. B2IOOB0210 

1OOH0212 Acli receipt of 820907 Itr informing NRC of steps taken to 
correct violations noted in IE Insp Rept 50-306/B2-S3 
OtSHGF. T II Division of Resident, Reactor Project fc Engineering 
Programs B2/10/04 PAPAV.L T Southern California Edison Co Ip 
15A3B 08A 24X Fiche 50-206,62/10/04.8210000312 

5210080214 Responds to NRC 820B12 Itr re violations noted in It Insp 
Rept EO-2O6/BS-23 Corrective actions station procedure 
amended to Include instructions on draining reactor coolant 
samples From all locations Si double valve verification 
PAPAV.L T Southern California Edison Co 82/09/07 

ENCELKEN, R H Region 5, Office of Director 3pp 1 S63B OB/ 24X 
Ficho 50-306. 62/10/04,0210060212 

081<f0233 IS Info Notice BO-35, Suppl 1, "LeaKing & Dislodged 1-125 
Implant SeeOs " Svc list encl 

CODE. L 1 Division of Fuel Facilities, Materials !< Safeguard) 
32/10/06 Consolidated Edison Co of Neiu Vork 6{,ff 13761 2bO 

24X Fiche SO-000, 33/1O/O6, 020S190233 



0209190233 IE Bulletin 83-O3, "Stress Corrosion Cracking in Thick- 
Ual 1, Large-Di ameter, Stain I ess Stee 1 , Rec ircu lation Sys 
Piping at BWR Plants " Svc list encl 

DEVOONOpR C Director's Office. Office of Inspection and 
Enforcement 03/10/14 Consolidated Edison Co of Neu York 

115pp 15B10 123 24X Fiche 50-OOO, B3/1Q/ 14, 830819023B 



B Reportable occurrenci 



LERs {, related correspondence 



S2100B0124 Recommends that B10717 event re ignition of gaseous ujaete 
decay tank should be considered for Inclusion in NRC third 
quarterly AO rept to Congress for 19BI Details of event 
enc 1 

DRM3TEIN.U L Director's Office Bl/OB/06 MICHELBOH. C 
Director's Office 3pp 15fi63 205 24X Fiche 50-206,01/08/06. 
B2 10060 124 

S21OQ1G008 Responds to F01A request foi 19 categories of documents rff 
nuclear reactor event-s t- safety problems Forwards documentSi 
listed in App A 

FELTDN.J 11- Division of Rules and Records B2/06/3B UDELL, R A 
Critical WSBS Energy Project I5pp 15727 005 24X 
Fiche 50-000, BH/06/28. 031 001000H 

8IOB13026B Foruards details re 010717 ignition of gaseous uas te docny 
tank at facility Event should be Included In Commission 
third quarterly AO rept; to Congress for 1931 
ORNSTEINiH L Director's Office 81/OB/06 MICHELSON, C 
Director's Office 3pp 15730 103 24X Flihe 50-000,02/06/28, 
B2100I0008 

8111300367 Operating Reactor Event Memorandum 81-32 on B10903, control 
room operator manually tripped reactor after transient from 
887. power initiation bij steam generator flou & level 
oscillator Ca-used by ragulated power supply failure 
ElSEIJHur.D Q Division of Licensing 01/10/31 VQLLMER, R H 
Division of Engineering HANAUEf), S H Division of Human Factors 
Safetij HATTSON.R J Division of Safety Technology 9p p 
15731 Q3*t 34X Fiche 5O-000, B2/O6/28, H21001000B 

B2011501BO Forwards draft TR notice re 910903 AO on failure of hinh 
pressure safety injection sys 

DIRCKS.W J Office of the Eiecutive Director for Operations 
BI/12/OS CHILK.S J Office of the Secretary af the Commission 
9pp 19732 007 3-JX Fiche 50-000. 82/06/20' 8210OIOOOH 

8210010360 PNO-V-82-038A on, 820922. one truckload of trace contaminatO<l 
sewage dumped at Log Angeles County seuage treatment 
facility Contamination found In rinse truck Truck returned 
to licensee for ducantami nation Addl sample* luill be taken 
VUHAS.Q . UENELAWSKI.F Region 3, Office of Director 82/O9/34 
Ip 15574 093 24X Ficne 50-206, S3/O9/24, 6310010260 

6210190490 Foruards revised LER. 81-Q25/Q1X-2 Detailed event analynin 
one 1 

RAV, D Southern California Edison Co 82/10/06 ENffELKEN, fi, 11 
Region 5. Office o* Director 2jip 15739 335 34X 
Fiche 50-306,02/10/06,0210190490 

0210190504, Reviled LER 81-Q25/01X-2 on 01 1039, uih i le conducting to 11 
shutdown valv testing, ball valve CV-534 did not close 
automatically on Isolation signal Gauged by failed relay 
doling circuit of each valve Relays replaced 
RAY, H B Southern California Ediaon Co B2/IO/06 Re 

Office of Director Ip 15739 337 24 X Fiche 30-306, BS 
B2 1 0190490 

Q210230SQO RO 82-025 on S21013 b 13, Hre watch patrol posted 
lubrication oil reservoir area but not at post Time ptriod 
exceeded l~h Interval by 30 minutes Caused by personnel 
miiundirstand ing 

RAY,H D Southern California Edison Co 83/10/14 ENuEU 
Region 5, Offio of Director 2pp 19791 096 24X 
Fiche 50-2O6, Q2/IO/14, B21O2502BO 

8210280066 Forwards LER B2-O23/03L-0 Detailed event analuti* 
RAV.H B Southern California Ediion Co 82/10/19 EN ELK 
Region 5, Offict of Director 3pp i 5B37 B49 24X 
Fich 50-206,82/10/19,8210280066 

0210200049 LER B2-033/03L-Q on 880?l9iflre water crosstie d 
during n>u const activities Caused by incorrect const 
digging praetis Uest fire water puma returned to vc Back 
fire iuppreion hoes rigged 

RAY, H D. Southern California Edison Co 82/10/1-9 fit 

Offiee of Dir.ctor Ip 15837 291 S4X Fichu 3O-206. 82 
8S103800&6 



DOCKETED ITEMS 



V Operator Eliminations 



6210390316, Forwards "Improvements in Training !t Requal IFication. 
Prdorams a Required by Till Action Items I A 2 1 !> I [ Q 4 
for Ban Onofre Nuclear Senerating Station-Unit 1." technical 
evaluation rept Training programs acceptable 

CRUrCHFIELD, D Operating Reactors Branch 5 52/10/36 DIETCH, R 
Southern California Edlion Co 3pp L5E934 101 24X 
Fiche 50-206, B2/10/24,a3102'to3l6 



B210290330 " IraprovemBnts in Training t Hsqual if (cation Programs 
Re-quired by TMI Action Items I A 2 1 t II D 4 for San Qnofre 
Nuclear Generating Station, Unl t I," technical evaluation 
rtpt 

Sc 1 ence Ap p 1 ic-atl uns, Inc NflC-03-Ba-<Wi SA1- 186-029- 17 
82/OB/17 NRC - No Detailed Affiliation Given 1 3pp 

15954 104 24X Fichs 50-306, 03/10/26.8210290316 



B21Q190663 Responds to open items re SEP Topi 
Considers! innx. " per 830622-23 meetings to 
of leismlc re-evaluation program 
COUNGIL.U Connecticut Yantee Atomic Pow 
CRUTCHFJEtD, D Operating Reactors Branch 5 
Fiche 5O-213, 62/09/37,8310190663 



c III-6 "Seismic 
discuss status 



5pp 



02/09/27 
15739213 



~82101<?066B ''Mechanical fc Electrical Equipment Seis 
Program, Haddam cl Nuclear Generating Station." 
rept 

> Stevenson >, Associates 01C132 I B2/06/3O 
15738 HIS 24X Fiche 90-313, B3/01/37. B2I 0190663 



ic Re-Eva I uat ion 

inter im 



224pp. 



8210070010) Forwards summary of SEP topics for which facility dues net 
meet current licensing acceptance rritena 
CflUTCHFlGLB. D Operating Reactors Qranth 5 G3/0<?/30 COUNGILiHO 

Connecticut Yankee Atomic Poue r Co 45pp 1562B 032 S4X 
Fiche 50-213. 92/09/30, 8910O7OOI 



DOCKET 50-20B COLUMBIA UN1V RESEARCH REACTOR 

P Operating license stag* documents & correspondence 

83102903-09 Advie that reactor has never been fueled or operated 

Fuel not on campus No plans to attlvati reactor in near 

future Rsques.l variance to 10CFR50. App E retirements until 
anticipated r sac tor startup 

MEuKOfJlAN-E Columbia Univ H2/10/13 DEMTDM, M FI Offiea of 

Nucli-ar KeactoT RaguUtion. Director Ip 1 5953 I6b SW 
Fiche 50-2O3. B2/10/12, 3210390309 



DOCKET 50-213 KAODAM NECK PLAMT 

P QpBrating licerm ataje documin-ti *> Eorrespondence 

8209300324 Fovuarda "G-e-olog i cal b Seiimalog ical Btud i BSi Hiddam Neck 
Njcliar Station, Part I Hcipanitt to 1979 NIC In fa Flequest" 
&. "Part II Reiponiei to 199! NIC Info Riquetti " in rc-iponta 
to BEH Topics II-4 k II-4 

COUNSIt.lJ O Connecticut Vant** Atomic Pouar Co BS/09/22, 
CRUTCHFIELD.O Operatinfl Raactort Branch 5 2pp 13557-179 24X 
Flch 50-213, B2/0?/22,S2093CX1326 

--82093Q0332 "Oeologlcal I* Senmo 1 agica 1 Studies. Haddam Ned Wuclear 
Station. Part 1 fleaponjes to 1979 NF1C Info Req.uit " 
Twelve overslti- figure) ert 1 Aperture cardt are ivallJbl" 
in PDH 

* Western Oeophi/iUal, B3/07/30 194pp 13537 101 B4X 
Fiche 5O-al3. 62/09/32.020^300336 

8209300336 "OeologUal ! 3t i tmalogica 1 Stud l B*. Haddam Neck Nuclear 
Statmn, Par t II Responses to 1731 NRC Info Ra quest " 
Mine Dve*ile Figures encl Aperture card* are available in 
PDH 

* Ucitac-n Otophyllcal B2/07/30 117pp 15558 0|4 24X 



B2100I02O7 Forwards "Hadilam Heck Plant Procsdjrs AOP 3 a-sa-C RGB 
Wanting or tJoncondenstbli SBCII" b "llflUtoni Nuclear Power- 
station RCS Venting Procedure OP B398, " In reipan** to THI 
Action Plan I tm II B 1. "RCS Hijh Point Vent " 
COUNEIL. H 0, Connrtticut y*nki* Atomic Power Co CQUNBIL. H 
Narthsait Nue Imtr Enargij Co dubs at Nortrheait UtH(tte* 
CQUNSIL. H 0, North. SB* Utilltisi 82/09/22 CRUTCHFIELD, D 
Operating Ractori Branch 5 CLARKiFl A Operating RtictoM Dr-anch 
3 3pp 1S56B 04Q S4X FUhe 90-000,02/09/22,3210010207 

B210CH0210 Revitlon 5 to "Haddan Week plant Procedure AOP 3 2-22-C HCli 

Vgrxting of Naneondonalb le Oasti " 

* Connecticut VanLge Atonic Power Co, 02/00/26, llpp 

15S6B 031 H4X FieJia 50-000, B3/09/S2,B21 0010507 

B2100102M Reviiion 2 to "Millitona Nuclear Poiusr Station Unit 2 Plant 

Procedure OP E39B flCS Vsntinj Proodura " 

SCAC>S E Nortlmst Nucliar Energy CD <iubi of Northeait 

Ut 1 1 i tts ) 82/OB/2Q llpp 15566' OiE 24X 

Fich. 50-000,B2/Of/22,BBHMI0307 

6210010312 R*nutiti that proceiting of BE0612 license amind 4p*lic>tlon 
ba poftponiil Revl**d *pplictin changing radiological 
affluent Tech Spaci ulll be docketvd on or about 821115 for 
both f-acilltlai 

COUNBIL, W Cornectfcut Ynfce Atomic Pauer Co COUNBIL.H 0. 
Northtatt Nocltar Enarg^ Co Ciubt of NortJiiait UtiUtdi) 
CCUMalL.W Northaait Utlllttei fi2/OT/E2 CLARK. R A Operating 
Reacbor Branch 3 CRUTCKFIELDrD, Opiriti ng RiactoM Branch 9 
3p P 1S374 047. Z1K Fieht 50-000.82/09/88.8210010312 



B2I013033I Disco*i revision of admi ni stcati ve proc orturet to 
incorporate revised uorMng hour guidelines t, pruvisiant 
for author 1 1 ing deviations per 020309 !> 0615 requests. TMI 
Item 1 A 1 3, "Shift Manning" - Oener ic Utr 82-12 

COUN9IUU . CAQNETTA. d P Northeast Wuc 1 ear Enorjij Co (iubs uf 
Mortheast Utilities) CDl/HSlL, W Connecticut Vflnkeo Atimiii f'ouiEr 
Co B2/10/01 EISENHUT,!) C Division of Licensing 3pp 
15679 127 24X Ficho SO-OOO. B3/IO/OI , B21OI 30331 

S21007O404 Advices that review indicates requirements of HMEO-Q1J7 
I turns IIE424*[[E4Z7re containmenl isolation 
dtpendab 1 1 1 tu have tieen met 
CRUTCHF1ELD. D Operating Reactors Branch 3 83/1O/04 COUNfilL.Ut 

Connecticut V an kee Atomic Pouer Co 3pp 19633 314 31X 
Flcho 50-213, 93/10/04,821007040'* 

8310130294 Forwards "Haddam Neck Plant Seismic Doaigin" tochnical 
evaluation re pt 



CBUTCHFJEt-D, D Operating llegctors Branch 9 
COUNSIL.IJ Connecticut Yankee Atomic Power 
24X Fiche 50-213,02/10/04.8210120396 



FIN A-6436 02/lu/Oi 
Co 44np 1569-1 2<Jl 



B2I012&30Q "Haddam Nock Plant Seismic Design." technical evaluation 
rept 

DHICOES^T U , DUSCII.S U , MDnTON.I) K EOtO. Inc FIN A-A4i>6 
EOG-EA-AOlfa D2/00/31 CKEHG, T Divifllon of Licensing I'U'lpo 
15654 293 24X Flche 5O-213, B2/10/O1. 



D210I30305 Foruards aafeti; evaluation of NUDEO-0737, TMI Action Urn 
II E 1 Si "AujlHarg rediuiiter Byi Automatic Initiation t 
Flou Indication CF-16p F-l 7}, Haddam Neck Plant, " technical 
evaluation rept 
CltUTCHFIELD.D Operating Dsactnrt Branch 5 Q2/10/03 CQUWail .U Q 

Connecticut Yank<( Atomic Pouier Co 6pp 156T) 37] 24X 
Fiche 30-213,82/10/09,0210130205 

BSOB1TO17B "Auxiliflri) Feedwatar Automatic I ni tiat ion t- flnu IndiciUt 
HutfiJa Nvck Plant," technical evaluation rapt 

KAUCHER.JE , FCOTNEfi, K Franklin Institute/Frank 1 In Heiearrh 
Centor NflC-03-79-llB TER-C5E37-a94 B2/OP/17 KCNDALL.fi . 
WIODO(i,M NHC -No Detailed Affiliation Olven I6pp S3675 '-lir 
24X Fltht 30-213.82/10/05,0210130303 

BE1Q1303S6 Comttuntt on proposed scape of Phase III of SEP ai re^lnttl 
in Individual topic definition* appended to BSOfO'/ Itr 
Staff (ncourji jed to develop li Implement means to incorporate 
poittlve attrlhutti of Phase III In 1 1 cenaee/NRC Interface 
KACICH.R H BEP Burners Group Q2/10/07 EISENHUT.D Biwlnon e t 
Licanslng 7pp 1S6B2 179 24H Fiche 30-000, B2/IO/07, BS1OI 303Ji 

6210210326 Foruardi tafstij evaluation at licensee safely tiitumi-rH ai 
SEP Topic III-3 A, "Effects of Pipe Break on Structures, But, 
tc Comjionnt> Inildr Containment " Methodolnpg t- acceptancr 
criteria appropriate to resolve Itiuei in tafttij evaluation 
CnUTCHFIELD, D Qptratlng Rise tori Drnch S 89/10/12 COUNCIL, W t 

Conncbicut Vankee Atomic Pouir Co lOpp 15766 321 21 X 
FUhe SO-2I3, 02/10/12,8210310226 

6310270200 Foruiardt lummarg of FIRC positions on 26 unresolved al|^ 
litut*, contii ting of eicirpts from NRC publications & reptt 
to Congreis & aiiestment of generic app Hcabtlltu, AJ*nu*tr 
bailsi aiist* to warrant continued plant opuration 
COUN3IL.H , DPEKA-J F Connecticut Yankee Atomic Poutr Co 
COUWaiL.W Horthtait Huqlaar Energy Co dubi of Northtait 
Utllltiti) B2/10/13 CRUTCHFIELD, D Operating Rector Brarnh S 
4Qpp 153S4 334, 24X Fiche 50-000, BS/lO/l 3, 8210370300 



33 1 0330363 Forwards "SEP Topic VII-I A, Notation of Rtuctor 
SY From M0ntaf*tg Bui for HdJ*m Macli Plant, " final 
technical evaluation. 

CHUrCHF I ELD, C Operating Reactor* Branch 5 FIN A-64S3 
CQUN8IL.U Cannecticut Yank** Atomic Power Co 2pp 19790 lit 



DOCKETED ITEMS 



23 



"SEP Topic VII-l A, Isolation of Realtor Protection Sys From 
Honsjfetij Ei|5 for HadiUm Neck Plant," final technical 
evaluation 

MQRKEJ1, D J . UDY.A C EG10. Inc FIN A-6425 EGC-EA-6033 
SS/Q'P/aQ 23pp 157TO 153 21X Fiche 50-213, 03/1O/3Q, S31 0250363 



Inspection reports: IE Bulletin; 



: arresp ondenc 



ZIOO-7OOD7 Responds to FOIA request for eight categories of records re 
stead generators & steam turbines App A documents provided 
in R Udell FOIA Revest 81-313 Forwards documents listed in 
App B 

FELTCN. J M Division of Roles and Records 82/00/10 LONG, D J 
Winthrop. Stimsnn. P.jtnam 1 Roberts 9pp 15645 063 24X 
Fiche 50-000,03/03/10,3210070007 

6210070119 Forwards tabulated data on steam generator Insp tt maint at 
facilities Data should be provided to licensees 
tPPOLITD, T Operating Hedctors Assessment Branch B3/04/01 
VAHGA.S Operating Reactors Branch 1 5pp 15645 131 24X 
f-irhe 9O- QOO,a2/OS/10, S2I007QO07 

E3210O7O1 '3 Forwards info re steam generator integrity t- inaps at all 
nperatinj PUHs, per 750330!- 31 requests Details of insps, 
including defect ind i ca I ions, tube plugging criteria t- tubes 
plugged uill not be provided encept for Point Beach 1 
GOLLER, K R Division or Reactor Licensing (NRR-1975 only) 
75/03/21 MACCARY.n Fl Division of Technical Review (NHR-1975 
only) 5pp 15645 196 24X Fiche 90-000,92/00/10,8310070007 

3ZMOO1O332 Ack receipt of B20SI3 Hr informing NRC of steps taken tn 
correct violations noted in IE Insp Rept 90-213/83-03 
Violation ui 1 1 be rescinad due to misunderstanding re 
termina 1 1 on dates of contractor employees 
ItrtRTIM. 1 T Division of Engineering & Technical Programs 03/09/23 

CGEJbSCL, M G Connecticut Yankee Atomic Pnuier Co 3pp 15569 164 
.T-lx FicHe 50-213,33/09/23.8210010333 

J10050376 Act receipt oi 82O62B evaluation of SEP Topic 111-3 C, 

[nservice Insp of Water Control Structures " No comments 
torL-drded 

CQUNSILiW C Connecticut Yankee Atomic Power Cn 83/09/24 

i IIL'TCHFICLB, D Operating Reactors Branch 5 Ip 15608 376 34X 
Fiche 50-an, 03/09/24. B2IOOSO37A 



Forwards request For addl info to complete review of BO 11 04 
response to IE Bulletin 80-11, "Masonry Hall Design " 
R-esponse expected uithin 60 days of 1 tr receipt 

".LARH.R A Operating Reactors Branch 3 B2/09/2B COUNBIL, W 
( onnec ticut Yankee Atomic Power Co COUNSIL.W Northeast Nuclear 
Energy Co (sub* of Northeast Utilities) I3pp 15716 100 24X 
Flctie 50-000,02/07/23,3210130699 



8210270249 LER BI-OO5/O3L-0 on 810424. unattended ueldirio cables found 
running through access In fire barr ier, poss ibly preventing 
closure Caused by contractor falling to inspect fire 
barriers & falling to provide connectors in cables 

TEST, ft I Connecticut Yankee Atomic Pouer Co 81/05/10 Region 

I, Philadelphia, Office of the Director (81/03/01) Spy 
19633 342 S4X Fiche 50-213, 81/OS/ 10. 0310370315 

8310010003 Respond! to FOTA request for 19 categories of documents re 
nuclear reactor events t> tafetif problems Forwards document] 
listed in App A 

FEtrQNiJ M Division of Rules and Records B2/06/2B UDEUL.R A 
Critical Mass Energy Project ISpp 1 57H7 003 34X 
Fiche 50-000,82/06/28.6310010000 

3111180001 Recommends comprehensi v> assessment of plant operating 
conditions to determine tpecific predetermined time related 
sequences of occurrence to emergence buses SRP should be 
rtvlsed re dei9i feature* 

A8HE. F Director's Office 81/IQ/li MICHELSON.C Director 's 
Office 4pp 15731 049 24 X Fiche 50-000, 03/06/EB, 



82101S0132 Forward* LER B2-006/03L-0 

CRAVES, R H Connecticut Vanhe* Atomic Paiuer Ca 05/10/O5 
HAVWE6.fi C Region 1, Office of Director lj> 15721 277 34X 
Flihe 50-213.83/10/03,0210150132 

--82I015012B LER 33-OOi/03L-0 on BS0919r emery ency tfc battery bank D.cell 
42, found leaking electrolyte through team crack Inep 
revealed 11 mare batteries w/cracks in same location Caused 
by cell plate eipanslon against jar & battery age 
QLlINN.ri D Connecticut Yankee Atomic Power Co 82/10/05 
Region 1, Office of Director 2pp 15721 27 B 24 X 
Fiche 50-313,02/10/05,8210150123 



8210180071 Forwards LER B2-007/03L-0 

GRAVES, R H Connecticut Yankee Atomic Pouier Co 
HAYWEB,H C Region 1, Office of Director Ip 
Fiche 50-313, 83/10/30,3310230071 



02/10/20 
15B37 347 



8310280074 LER B2-007/03L-0 on 830927, opera tor received rod drive sl.ivfl 
cyclir failure/rod stop a larm. rendering all bank subgroups 
Inoperable Caused by master cycler relay hanging up due to 
poor relay contact Mercury wetted contacts reuet 
QLMNH, H Connecticut Yankee Atomic Pouer Co 83/10/EO 
Region 1, Office of Director Ip, 16337 348 24X 
Fiche 50-213,82/10/20,8210230071 



DOCKET 50-319 OYSTER CREEK NUCLEAR POUER PLANT 

F Security, medical, emergency b tira protection plans 



-jBl 90333 IE Info Notice 80-35. Buppl 1, "Leaking (. Dislodged 1-12!) 

Implant Seeds " Svc list encl 

iOHD,L f Division of Fuel facilities, Materials & Safeguards 

Consolidated Edison Co of Now York 66pp 19761 250 
SO-000,83/10/06. 0300(90233 



Ack receipt of aaOaiE Itr informing NRC of actions taken to 
improve emergency preparedness program per IE EmerQencij 
Preparedness Appraisal Hpt 50-B19/S2-01 

ALLAN- J H Region 1, Office of Director, 02/10/12 FIEDLER, P 
General Public Utilities - CPU Snrvlc* Corp 2pp 19776 326 B4X 
Fiche 50-319,83/10/12,0310220102 



IE QulUtin a2-03. "Stress Corrosion Cractring in Thict- 
Wa I 1, Large-Diameter, Stainless Stoe I , Dec ircu la t ion Sy i 
Piping at DUR. Plants " Svc list encl 

DEYCUNG.R C Director's Office. Office of Inspection and 
Enforcement 83/10/14 Consolidated Edison Co of Nflul York 

U5pp 15810 125 24X Fichu 50-OOO, 83/1Q/ H, 8308190338 



Forwards 1C Insp Rupt 50-213/BE-17 on 830823-0936 No 
nnncompliancB noted 

ETAFIQSTECm.R Division of Project & Resident Programs B3/10/1S, 
COUNSIL.W C Connecticut Yankee Atomic Power Co Spp 15853 3i'J 
24)t Fiche SO-213. 83/10/15. 03I029018 1 ? 

6210390194 IE Insp Rept 30-213/82-17 on 020053-0936 Ho noncomp 1 Unca 
noted Major areas inspected facility tours, log & record 
re/ieu. aurvei 1 lance ti containment ent< y 

REBELCWSKr, T , ELBASSER, T C Division of Project & Resident 
Prosrami 83/10/14 7pp 15B5331S 34X Fiche 90-213, 82/10/13, 
02I02901B9 

3 Reportablc occurrences. LERs I related correspondence 

9210370345 Forwards LER B1-005/03L-0 

GRAVES, (I H Connecticut Yankee Atomic Pouier Co 01/05/18 ORIER.D 
Region 1, Philadelphia, Office of the Director (01/03/01) la 
J3B22 341 24X Fiche 50-213,81/05/18,8210370345 



8210330187 Responds to IE Emergency Preparedness Appraisal Rpt 
90-819/82-01 Corrective actions training program developed' 
emergency control ctr moved away From control room & 
ventilation syi upgraded 

FIEDLER, P B, General Public Utilities - OPU Service Corp 
BZ/OEt/12 SMITH, If Division of Emergency Preparednen 9pp 
1377A.330, 34X Ftche 50-319,82/10/12,8210220182 

8310250393 Forurd* Revision 13 to physical security plan Revision 
withheld 
LAOOART.rt H Qeneral Public Utllltit. - OPU Service Corp 83/10/19 

Office of Nuclear Reactor Rejulation, Director IP. 15790 136 
24X Fiche 50-219.03/10/17,3210290303 



H General correspondence 



8307180051 FOIA request for seven categories of info re nuclear matl 
transported by M Rah In Apr 1900 to BeaHyi NV b General 
Public Utlls submissions From 000101 per Price Anderson Act 
VAN S YQC, C Tomar, Parfci, Sellgir, Simonof f & Adaurian. 82/00/34 
FELTON'J M. Division of Rules anil Records. 2pp 1576O 196 34X 
Fich* 50-21*?, 82/06/34, 83O71S0051 

8310190163 Partial response to FOIA request for seven categories of 
info re nuclear fflitl transported by N Ftoh In Apr 1980 to 
6*atty,NV l> Contra! Public Utilt submivsionf lines 800101 
per Trice-Anderson Act ra facility Forwards App A documents 
FELTON,J M Division of Rules *nd Records. B3/09/15, VAN BYOC.C 
Tom*r< Parks, Stllgtri Slmonoff & Adourian 3pp 13740,199 24X 
Fleh 50-219,82/09/13.8210190163 



24 



DOCKETED ITEMS 



Operating license stage documinti & ci 



0210010063 Inform! that Euan rest Hept XN-NF -78-12. "Spray Codling 
Heat Transfer Test Resu I ti, Phase-1 I Facility ti Test Data 
EtiC Oi8 DWH Fuel," ui 1 1 be ulthheld per 1QCFR2 790, In 
response to S2GBQi> request 

CROTCHPIELD. Oparating Heacton Branch 5 03/07/23 FIEDLER, P U 
General Public Utilities -CPU ServiieCorp 3pp 15567 167 24* 
Firhe 50-219.32/09/22.8210010063 



Q210010077 Forwards rlarV I containment long-term program, pi ant-uniqu 
analysis repts for suppression chamber vent sys & torus 
attached piping Safety relief valve piping analyse 
completed !. foruardeil bij 031215 

FIEDLER, P B Genera! Public Utilities - GPU Survi 
CRUTCKFIELD. D Operating Reac tors Branch 5 2pp 
Ficht 3(3-219,62/09/34,6210010077 



Jill be 



Corp 83/09/34 
1554,6 033 21 X 



8210010001 "Ouster Creel Nuclear Generating Station Hark I Containment 
Long-Term Program. Planl-Unl qu* Analysis Rep t. Suppression 
Chamber 1 Vent Eija " 

HPH Associates, Inc MPR-733 B2/QB/31 300pp 155ifi 035 
24X Fiche SO-219. 92/O9/24, 631 001OO77 

--9210010095 "Oyiter Creek Nuclear Cer-erating Station Marl I Containment 
Long-Term Progranii P lanl-Unl que Analysis Rept.Taru! Attached 
Piping " 

HPfl Associates, Inc MPR-734 S2/QS/31 157pp 155fi4 359 
24X Fiche 50-219,82/09/2-1,0210010077 

B2100402A1 Forwards notice of consideration of issuance of amend to 
provisional QL, DPR-1A, re increase in spent Fuel storage 



capacity to 2,600 assemblies 

CRUTCHFIELD, D Operating Reactors Branch 5 

General Public Utilities - G-PU Service Corp 
Fiche 50-319,63/09/28,9210040261 



B2/09/23 FIEDLER. P D 
2pp 15595 003 24X 



B2I004Q3A5 Notice of consideration of issuance of amend to provisional 
QL.OPR-lfi, re increase in spent fuel storage capacity to 
2, 00 asienblies 

CRUFCHf IELD.D Operating Reactor* Branch 5 82/09/28 4pp 
15595 003 24X Flcne 30-219, B2/09/28, B21O040261 

82100BQ043 Foruards 1NPO "Evaluation of Oyster Creek Nuclear eaneratinn 
Station." per rioselerj aiOSOi request & Stello G10626 memo 
EMITH.G H Dwiiton of Emergency Prparednes 6 Operational Support 

B3/09/29 TAVLOR.O H Division of Beactor Programs Ip 
15643 037 24* Fiche 50-2J9, B2/0-J/29. 82100B0063 

B21&OBD07-7 "Evaluation of Oyster Creel Nuclear Generating Station " 
" Institute of Huelsar fouer Operations Hl/12/31 33DD 
13643 O3S 24X Fiche 30-21^.1 



8310370345 UJFEOflATED PLAWr SAFETV AS5ESStNT, SVSTEMATIC EVALUATION 
PROSRA1 Oyster Creel Nuclear Generating Station Docket 
50-219 ICPU Mucl.ar Corporation And Jerisu Central Pouer And 
Li jht Companv ) 

Division of Licensing MJREO-OB23 DF1FT 62/09/30 537on 
15850 14fi 24X Fiche 30-319, B3/O9/30, S21027O3-43 

9210130326 Cufn,ntnts on proposed icope of Phait III of SEP as reflected 
In Intfividual topic dafinitlani appended to 92O909 Itr 
Staff encouraged to develop (, ioiplemint means to Incdrporata 

5S? ri V S *' f P !i a " IH ln '""C interface 

ACICH, R M SEP Owners Oroup B2/10/07 EISEWHUT.D C Division of 

LIen*lng 7 rf IS6B2 1 79 24X Ftch* 30-000, S2/10/O7, 6310130326 



210190502 Advi ie that company no longer performing analyses far It*. 
Nuclear supplied fuel under irradiation in plant Util made 



separate arrangements Util utiluing or planning to utiHi 

fuel for operating conditions outside analyied j. ...... 

OW5LEV.G F Enon Nuclear Co , I 
B2/10/13 RUBENBTEIN.L S A 
Systems Ip [5740 196 24 



. uf Elian Corp J 

istant Director for COTB t f'l-anl 
Ficne 50-219, B3/ 10/ 13, 03iQ1105CiJ 



210200040 Foruards corrected FR notice of c ons idoral ion of amend 
License DPR- 1 6 r ipent fuel storage cnpacity published 
B2100B, reflec t ing B2I10S as deadline For requesting hearing 
CRUrCliriELD, D Operating Reactors llranch S [tS/lO/ll MTLDIFI 

General Pub lie Utilities - GPU iiorvicuCorp 4pp 15757 ,'Uf, 
Fiche 50-219,32/10/13.6210200060 



8210S601B3 Foruards Amend 63 to License DPR- 1 A, safety 8VJl nat LHII 
notice of issuance ' aval labi 1 1 tij Amend anthoritcs addition 
of control rod drive scram discharge vo 1 high lovel 6 roif 
block to Tech Spues 

CRUTCHF1ELD, D Operating Reaclois Hranch 5 02/10/15 riEGU 
General Public Utilities - GPU Service Cnrp 2pp J"iW) .' !ll 
Fiche 50-219. 62/10/15, B210260IB2 



--Q21026Q1B5 Amnil i3 to License DPR-1 6, authon j i ng addition of CCIII)T;| 
rotf drive scram discharge vul high level d sci am trip bifpiii i 
rod block to Tech Specs 

CfiurCHriELD.D Operating Reactors llranch 5 H^/10/]5 :',ip 
15803 235 24X Fiche SO-E1?, B2/1O/ IS. OHI 



,'ff 



S210240IB7 Safety evaluation supporting Amend 6') to LitoiiiO fH'W 
Otfice of Huclear Reactor Oegulalion, Director 
13B03 241 24X Fitho 50-21?, B2/10/ I 5, E12 103ft{)ltf2 



B202010167 "Technical Evaluation Rept for BWR Scram RiBCh.irnc Uw I 
Lonj-Tenn Moil) Oyster Ci eck Nuclear Generating Station " 
KUCHA, E Franklin Ins 1 1 tute/Frankl in Research Center 
Nf)C-03-BI-I30 TEfJ-C 5506-50 02/01/27 bTCLrbTON, K Hill I 

Detailed Affiliation Given 53pn 15000 34'1 24X 
FlcJie SO-2C?.g2/10/15, 0210260103 



iilability of Amend {,'.} in t iirn><r 



8210260191 Notice of issuance 
DPR- 16 

CRUTCHFIELD, D Operat i ng Hcac toi s Branch 5 U3/IO/15 
15Q03 SIB 24K Fiche 50-219. D2/IO/ I 5, fl21 02601H2 



82102102QO Submits addl comments on GCP Chase II During final 
of BEP.NRC properly h effectively asiessed oafuty intent of 
SRPs & evaluated merits of alternative proposals 
CLARK. P R General Puo 1 1 c Utilities - CPU GBTVICD Carp 
CRUTCHFIELD, D pperating Roactoia Branch 5 2pp 13/69 1 4-H i?1 
Fiche 50-219. t!2/10/ IB, 6210210280 

8310250136 Foruartfs info re reactor protection Eys pouipr supnlij.u. 
response to Q20702 reiiuest for aifdl info Periodic 
Functional testing will be performed on assemblies by 
removing motor generator set from distribution bun 

FIEDLER, P B General Public Utilities - QfMJ Sorvire Corp (KVKVIu 
CRUICHFIELD, D Operating Heac tors Branch 3 2pn 1 37f]7 003 [!** 
Fiche 30-219, H2/I O/ 13. B2IO2S0136 

8210230189 Requests approval qf Tech Spec Change noaust m r* 4*4u* L , 
of station electric distribution sys voltan*5 ** degraded 
arid protectio-n for Class IE power sys, in rBiponao to OlIOlo 
Itrs Voltage regulators provide no safety function 

F 1^!'' P Q Bni ' rfll Public Utilities - GPU Service Corp fia/JO/JB 
CRUTCHFIEUD, D Operating Reactors Brunch S Snn 19700 Pfl/i C4J 
Fiche 50-319, B2/IO/10,a210250IQ9 



o 9ubmitl correction, to discrepancies identified In util 
821003 Itr re control room habitabllity Onp Oversije 
draulnn enc 1 rtperturo card is available in PDR 



, 0nral Pun lie utilities - OPU Service Corp 

tlStNHUT.DG Division of Lie ens Ing Spi\ ISBS3 MSI E-IX 
Fiche 50-219,03/10/19,0210290234 



8210270202 Advises of reviBu of deviations to stated positions 
contained in MJREO-0737, 1 1-* I [ F 1 3, "Containment IHjh 
Range Radiation Monitor " Monitors expected to be in. tilled 
during Cycle H rsfueling outage 
CRUTCHFIELO, D Op. rating Reactors Branch 3 02/10/20 FIEDUH.P 



8210250294 Notification of S2M03 mBB tin 9 ui/util in Dethesd.,HO ID 
facility"'' 1 *'"" 'P" 3 " 1 "frectivene.. i n ,t,a m Bnv iron at 
J ' P Bra t' n B HBactori Branch 5. B2/10/B1 

1 Dranch 3 3pp 1S791 17S 3 



DOCKETED ITEMS 



6^10270004 Advises that response to NUfiEG-0737, 1 tern II K 3 35, "Effect 
of Lou of AC Power an Pump Seals," ace ep ta b le. based on 
endorserrenfc of BWH owners group position Mods to seal 
cooling For r ec ircula t ion pumps not required 

CRUTCHFIELD, J> Operating Reactors Branch 3 02/10/22 FIEDLER. P D 
General Public Utilities - GPU Service Corp 7pp 15015 353 24X 
Ftch* 50-219.02/10/22,8210270004 



3210330187 Responds to IE Emergency Preparedness Appraisal Bept 
50-21 9/B3-0 I Corrective actions training program developed, 
emergency control c tr moved auau From control room t* 
venti lation igi upgraded 

FIEDLER, P B General Public Utilities - GPU Servica Corp 
82/09/12 SMITH. H Division of Emergency Preparndness 9p p 
15776 330 2flX Fiche 50-319, 02/1O/ 12, B21032OIH3 



U2IOO80015 Addl response to FQIA request for 19 categories of info re 
nLrrlear reactor events V safety problems Forwards documents 
listed in App A Documents in App D completely withheld Iref 
FDCA Exemption 5) 

FLLTON, J M Division of Rules and Records 02/O7/12 UDELL, H A 
critical (lass Energy Project 9pp 15465 027 34X 
Fiche 50-QOQ, SS/07/12.B2100B0015 

--Q2100SO140 Systematic assessment of luensee performance notes re 
facility evaluation for Auq 19/9-Jul 1980 
J NRC - Mo Detailed Affiliation Given BO/07/31 7pp 
13668 OOB 24X Firhe 5O-OQO. B3/07/ IS. f]21 QOH001 5 



820B190238 IE Bulletin 82-03, "Stress Corrosion CracHnc. in Thitk- 
Uall, Large-Diameter, Stainleti Steel. Hue irtu latiorv Syi 
Piping at BWR Plants " Svc list end 

DEYOUNG.H C Director's Office. Office of Inspection and 
Enforcement H2/ID/14 Consolidated Edison Co of Haw Vork 

llSpp 15310 135 24X Fiche 50-000.62/10/14.8303190330 

S Reportable occurrences, LEFIs tr related correspondence 

8210070438 Forwards ang ineerinj evaluation rept on 010827 shutdown 
cooling sys HX failure Failures diagnosd as 
fatigue failures due to floui induced vibration Event not 
considered flO Repairs lo be complete bij 911012 

LrtMIK.O Director 's Office Bl/10/15 Direc tor 's Of t ice 7pp 

15637337 SIXFiche 5O-219, SI /1O/15, 8210070438 



921007036B Forwards IE Insp Hept 50-219/03-20 on 820BQ3-G907 !. notice 
or via 1 a (. irjn 

STAR-OSTECKI., R Division of Project & Resident Programs 03/09/2.2 
FIEDLER, P D General Public Utilities - GPU Service Corp 2pp 
15634 1-IB 2-JX Ficfia 50-219,02/09/22,8310070269 

-f32lOO7O27D Notice of violation from insp on 030003-0907 

" Division of Project t- Resident Programs 92/09/22 Ip 
lSb33 ISO 24X Fiche 50-219,82/09/22.0310070268 

--HP1007QU75 IE Insp Rept 50-219/B2-2O on EJ20GQ3-0907 Noncomp I i anc B 
noted failure to folloiu equipment control procedures t, 
prepare procedures consistent W/1GCFR20 for work involving 
personnel radiation exposure 

COUCILL.C . THOMAS. J . TRIPP.L E Divialon of Project t- Resident 
Programs B2/09/17 lOpp 15634 111 31Xriche 50-219, 82/09/22, 

OS 1 007026O 



Foruards IE Insp Hept 50-219/02-19 on 020B03-06 No 
TioncoiTpliatite noted 
MART IN, T T Division of Fngineerlng fc Tecdnlcal Programs B3/09/24 

FIEtli-ER. P 13 General Public Utilities - GPU Service Corp 2pp 
1563-1 092 2AV Tiche 50-219, 02/09/24. 321O07O34J 

-t33[QQ7Q345 IE Insp Rept 50-219/03-19 an 330002-06 No none omp I lane o 
noted Hajor areas inspected 1 ICCISBB action on previous map 
f inri i ngs , ra d la tion protection instrument calihr (. training, 
pasting, labeling. ALrtRrt program ti rad waste program 
liRAY.J Fl , RdUE.C rt . GFIECNHAN. C G Division of Cnglnaermg !. 
rachnlcal Programs B2/09/23 lpp 15634 094 24X 
Fiche 50-319. 02/09/24,8210070341 

"2OBI90333 IE Info Notice 80-35. Suppl 1, "Leaning ti Dislodged I-12"i 
Implant Seeds " Svc list pnci 

CDBB, L I Division of Fuel Facilities. Materials % Safeguards 
B2/IO/06 Consolidated Edison Co of Neu Vork 66pp 15761 350 

24/ Fiche- 50-O 



(-210250205 Rsquests relief from insp of listed uields using volumetric 
>, surface eiam methods Results of review of inservice insp 
program requirements fc justification for relief in 
inspecting 10 dissimilar metal wolds end 

FIEDLER. P B General Public Utilities - GPU Service Corp 03/10/00 
CHUrCHFIEL.!), D Operating fieac tors Branch 5 3pp 15791 172 24X 
Fichff 50-219,93/10/00,0310250209 

e2iOl<?0375 Acfc receipt nf B20B31 1 tr Informing NF1C of steps taten to 
correct violations noted in IE Insp Rept 3O-2I9/8O-17 
MrtRTNJ, T T Division of Engineering !. Technical Programs 02/10/12 

FIEDLERS n Oeneral Public Utilities - GPU Service Corp Spp 
15711 O]7 24X Fiche 50-219,02/10/13.8210190375 

--SS10i9039B Hsponds to NRC 920116 1 tr re violations noted in IE Insp 
Rept 30-ai9/SO-l7 Corrective actions OA audit insp program 
of health physics activities implemented b training i- 
definitions of radiation protection staff improved 
FIEDI-ER.P II Qsnarol Public Utilities - QPU Service Corp 
02/03/31 SMITH.G W Division of Emergency Preparedness k 
Operational Support 15pp 15741 019 24X Fiche 90-219, 93/10/13. 
B21-019037B 

5210220132 Ac k receipt of Q20012 1 tr informing NRC of action* taken to 
improve emergency preparedness program par IE Emergency 
Prepare dnes* Appraisal Rept 30-21 9/B2-01 

ALUAN, J M Region ), Office of Director B2/10/1B FIEDLER, P D 
General Public Utilitm - GPU Service Corp Spf 13776 338 24X 
Fiche 5-Q-S19, 02/10/13,0210230102 



8210010008 Responds to FOIA renuest for 19 categories of documents ro 
nuclear reactor events !< safetg problems Forwards documents 
1 lted In App A 

FE(,TON, J M Division of Hides and Records 82/Oi/as UDELL. R A 
Critical rfass Energy Project 15pp 15727 005 34X 
Fiche 50-000,93/06/28.8210010000 

B1102300S5 Forwards- enginoering evaluation rept on shutdown cooling sy 

HX failures which occurred in late Aug 1981 Failures 

diagnosed at fatigue failures due to flou Induced vibration 

Recommends event not be considered AO 

LANIK, G F NRC - Mo Detailed Affiliation Given 01/10/19 NHC 

- Mo Detailed Affiliation Given 7pp 15731 012 SAX 

Fiche 50-000, 93/06/20, 021 0010DOB 

0310130167 Ho on B20B14, normo 1 shutdown initiated to investigate higher 
than normal dlfterentlal pressure readings in emergency svc 
water sifs Caused bij debris blockage consisting of live ! 
dead animal matter Organisms removed & tubes cleaned 
FIEDLER, P D General Public Utilities - GPU Service Corp 02/09/23 

HAVNES.R C Region 1. Office of Director 4pp 15673049 34X 
Fiche 50-217,82/09/33, 0210130167 

0310070178 Forwards LEFi 83-04<?/03L-0 Detailed event analysis enc) 

FIEDLER, P D Oeneral Public Utilities - GPU Service Carp B3/09/H4 

HAVMF3,fl C Region lr Office of Director 3pp 15634 290 S4X 
FichB 50-219, SS/09/S-t,B21007017fl 

02100701B1 LER 02-049/03L-0 on 030839, seven hijdraiflic anuoiors failed 

functional teiting after feeing, r-eplaceil bi; certified 
functional spare! Two snubbers had improper matl seal* 
Caused bij seal degradation tc/or worn poppet valves 
CHARTERINAi J Oeneral Public Utilities - GPU Service Corp 
82/09/34 Region I, Office of Director Ip 15634 301 2<1X 

Fiche 30-319,02/09/24,8310070170 



8210070330 Forwards LEtt B2-04B/03L-O Detailed avent analusis e 
FIEDLER. P D General Public Utilities - OPU Service Corp 

HAYNES, R C Region 1. Office of Director 3pp 19637 151 
Fiche 50-219, Ba/09/27. 9210070236 



0310070341 LER B3-04S/0>3L-0 on 020S26. reactor water level 
instrument* tton for ont channel in each of several safety 
igi randered inoperable as result oF loss of ret column 
head 

RIOOLE, E I General Public Utilities - OPU Bar vice Corp 
02/09/37 Region 1. OfPita of Director Ip !5<b37 134 3-IX 

Fiche 50-319, B2/09/27, B31O07023S 

8210130357 RO on S2QB29. reactor startup conducted w/ inoperable rad 
worth mlnimlier Hlnlmiier fal)*d due to defective clod 
drive module In slot 4J of CPU unit, damagingi several 
component* All damaged components rep laced 
FIEDLER. P B Oeneral Public Utilities - OPU Service Corp 03/09/HB 

HAVNES.H C Region I. Office of Director Spp 19679 010 H4K 
Fiche 30-219. B3/09/20. 0210130357 

0310060376 PNO-l-fl2-OA3 on Q210QI , anonumous phone caller notified 
licensee that bomb uaf set to go off In plant No bomb 
discovered in protected area 

COWOTLL, C , TfiIPP, MCCABE Region 1, Office, of Director. B2/10/01 
Ip 15619055 24X Fiche 50-319, S3/10/01. 8210060376 

8210150090 Forward* LER B2-050/03L-0 DttnUeif event analuiit encl 

FIEDLER, P Oeneral Public Utilities - OPU Service Corp 82/IO/O1 

HAYNES.R C Region fi Office of Director 3pp I570J 170 24X 
Fiche 50-219,82/10/01,8210150099 



26 



DOCKETED ITEMS 



9210150113 LER B2-050/O3L-0 on 620623, reactor vesml prrsiur L led in 
i ict 11 of I 1O fits u/Ttactor water temp greater than 212 F 
Caused bu inadequate Procedure A02 4 001 Teft procedure ulll 
bi reviewed to redefine temp/fret jure requirement* 
SAWTELLA.A General PuHir Utilities - OPU Service Corp 
S2/10/01 Rejion 1. Office of Director Ip I57O1 1BI 34X 

FUh 50-219-03/10/01. 82lDlSOO=p0 



P Operating license stage documents ft correc pondonct 



8310050514 Approves r ecircu lation B 
prior to safe-end r (placem-ont 
VASSALLO, D S Operdting Reactors 
Niagara Mohaul Power Corp 3pp 
FichB 50-230. B3/09/02,B21QQ50QI4 



Tomoval Info 



Branch 2 
15634 OSO 



B2/09/02 
24* 



DOCKET 50-220 WINE fULE POINT HUCLEAR ^ 

F Securjtu. medical, aiierger-cu t firs protection plans 

S3I001Q275 Forward* "Su,tetn.tic Assessment oF Licentee Performance 
ISALPl.Nine Mil* Point Nuclear Station Lftil t I." for May I?3I 
-Anr l9B3,utll B2Q73B Itr re performance improvements A NHC 
920630 request (-it of SftLP 630700 meetmj attendees end 
HAVNES.R i Region 1, Office of Director 62/09/38 RHODE, K 
Niagara rtahiul Power Corp 4pp- 15548 337 24X 
Fiehe 50-220, 82 J '0?/2Q,B210010273 

--B2100102BO "Su,s-t*fntlc Alignment of Licensee Per formance, Nina rllle 
point nuclear Station Unit 1," for flay 19Bl-Apr 1983 

Ragion 1, DFfict. of Director 32^06/29 27j>p 1 35iS 331 24X 
Fiche 50-220,62/07/^0, B2I001&a7S 

83IOOC.O303 Atii receipt of 93033-1 Ur informing NRG of ttepi talcen to 
improve Ittmi li(3itlfld tn Af? t A, 13 8. C of IE Emergency 
FTparedni flppraiia! npt 30-320/Q1-JB 
SMITH, C H Division n-F EmTg*ncv Preparedness 6 Bperational Support 

B2/09X29 RUDBE'O . Niajjara Mortaul Poue-p Carp 2pp 13il4 01B 
24X Fiche 50-8a0.e3/0?/a9BEI0060203 

S2I006020S Respondt to HOC B30222 Itr trajis mitt ing IE Emergency 
Freparerfne!! ApprainI Rept 50-230/01-10 Description* of 
jfisstnutnt/icUons (a be taktn for impravina Items 
identified In Appi A> Q t C of reft end 

LGMPOES. T Nlagar* Mohawk Pouer Corp 82/03/34 HflVHES, R C 
Rfjion I. Office df Director 22pp 13614 020 24 X 
Fiche SO-220, 02/09/2 1 ?, Q23CO60203 



Forwards revleu of safe ihntdoun an*lg!U in reipans to 
B2042& requeit for add I Info rt 10CFRBO,Cipp R,3ectiDn> 
III ! Ill L DC *iit 129-valt anal^lls for brtalar fuse 
coordination to be completed bij 821231 

JWWAN, C V Niagara Hnhaul Poutr Corp, B2/10/01 VASSftU.0, B D 
Operating Reactors Branch 2 lj> 19994 001 24X 
Fich 50-SSOj 82/10/01, 8210040296 



8210040303 ftp p R revnu of s*fe ihutdDLin analylli- 
* Niagara Hob'ut Pwir Corp 2/10/01 44ij>p 
Fittit SO-220, 02/10/01. B3I00402W 



tS59A 003 SIX 



9210050-083 FortLtarifi "Dupersian Modil Doicr ip 1 1 on for Ulnt Hile Potfity 
Jamvt A Fitip*trcl Wuclur Stations, " upgraded 
metOrolojic 1 (JI de-sCription p(r TH-I Action ltn III A 2 
DflVWE, J P Pou.r Authority oF the Statr of Nu Yart B3/1O/OI 
VASSALLO, D D Operating Realtors Branch S 2pp 13604 233 H4X 
Fiehe 50-333j sa/10/Dl. B2IOOMOS3 



S310I20632 Aflvi jes that S00421 request For title change of 
vlce-prei iden t cloied out uncc ut I ! advised change no 
longer required 

VASSflLLO, D B aporaliifl Reactors Blanch 2 B3/09/17 J}J'3f., I) 4" 
Niagara rlohaul Power Carp 2pp 15672 271 21X 
Fiche 50-330, B3/O9/1 7. B2lOI20i33 

82lOO'l0033 3utmil Info re removal * rep laccmont of rcattor 
recirculdtion *u piping. per B20922 r*nuB3 I Combined 
man rem eipomri estimates bounded bij original estimate nf 
2.90i man ram 

NflNCAW. C V Niagara Hahauik Pouer Corp B2/O9/27 EIBENJUT, P C! 
Diviiion of Licensing 3pp I 3 Si 5 I 70 24X Tithe 50 22O, II,V(IV 
B3 1 00 1 0033 



re canta i nment 
of HURCQ-Q73f & 
program Fee 



B2I0040H7 Foruards fae for tech Spec change 
dependabil I tij [n compl lance u/rcqu I remcnts 
reactor ret i rcula 1 1 on safe-end rap I acements 
submittal in response to NflC B30S25 Itr 

tWMGAN, C V Niagara Hohaut Power Corp 82/09/27 OIGQin i( lituntf 
Fee Msnageraent Branef. 2p(f ISSBI IB? 24X Ficho SO-?JO, IU HVIf.'l, 
B21D040I17 

&2I00401B2 Fartuards "Nine Mile Point Unit I Station Power Disli ihntion 
Sji (CUss IE) Luad Stud^ ti Field Test," in response tn Mlir 
9 1 0202 reiuest Required motor rewinding i- cabin rep I acemBJil. 
vii.ll tm performad during neit scheduled refueling outage 
LEMPOES, T E Niagara (Inhauf* Power Corp B2/O9/27 VAB'iAINJ.II U 
Operating Realtors Branch 2 3pp 15382 306 3-1X 
Flche, 50-220. B2/09/27. B3IOO'1(11Q3 

--B210010183 "fline Mila Point Unit 1 Station Power Distribu t inn 'm* 
(Class IE) Load Studi/ !. Field Test " 

DLASIfiK.L J , IflOEIJIO. J . LAIRD, ft C Niagara rloliauih Cow or I nrp 
ffl/13/10 96pp 15502 210- 24X fiche 50 220, OSfOf/'Jf. fl.'l (HUfJllW 

S3IOOI027S Foruartl! "Eijstematir Assessment of Licensee Pci f or-n.nn 
<BAl.Pl.Nine HUB Point Nuclear Station Unit 1." for Mag I "7111 
-Apr 1982,11111 EJ307SS Itr re performance improvements d NIK. 
02O630 requtit List of SAUP 020706 meeting attendees end 
HAVHES, R C RegiDn I. Office of Director O2/09/3H RHUUI , U 
Nlao*r Hohawk power Corp 4pp 1556H 327 34X 
Flche 50-230, 82/07/23. B21QQ10S75 

92100102GO "Systematic Assessment of Licensee PBrformancp, Nlnu Mil* 
Point Nuclear- Station Unit 1." fur Hay 1901-rtpr 1103 
Rajion 1, office of Btrector 82/06/3S 37pp 15560 -I'M *Mi 
Fiche 50-22-0, BS/09/3S. 8310010275 



931.0010297 Responds to radiological controls section of 
njctamatlc asiennant of Hceniee performance refit 
Commitments for performance improvements provided 
LEMPOES, T E Niagara Mohawk Power Corp 82/Q7/3B STAIOf, TKM . Ft 

Division of Project t. Reldnt Projrams 4pp 155MI 350 i'tlf 
FUhe SO-230. B2/09/2B, 3310010375 



--B2 1 001 0294 Inform, of 830703 meeting at site to dist.uss NflC U'. 
igltematic allotment of llcBmie performanca Ducunlon of 
tfforts re raiJ 1 oloj ical control activltioi should be 
prepared 
ETAROBTECKr.R Division of Project b Resident Pragrams 

LEMPOEB, T G Niagara Mohaufc Ppuier Corp 3pp I356B 3/i2 IMK 
FichB 30-320, B3/O9/2ff, 8210010279 



B2100505iO Foruarili 43 over-in drauinfit shauing connection of 
alternate shutdown aijs to normal fhutdouin BUS, In reipons* 
to NRC Q2O426 itr Aperture card* ara available in PDR 
1WJQAN, C V Niagara rlohaul Pouar Corp B2/09/30 VA8B/M.LO, D 
Operating Reactors Branch 2 Ip 15603001 24 X 
Fich. 50-220,93/09/30.6210090260 



B2100S0394 Notifii* thai propoud mod* to automatic deprnturl latlon 
iiji logic uill not he tubmitttd until 821203 Delai| needed to 
consider effect*, of lifted analyses 

HAWANi C V Niagara Hohtwk pauer Carp G2/09/30 EIBENHUT. ft 
Olvllion af Liceniing Ip ISiOi 348 24X FichB 50-220,03/09/31? 
B2 100503 34 



B2100S0111 Foruird* one ovartite revisvd ichadule for rec ircula 1 1 o 
nji repairs at fac i 1 Ittf- Apertor card is available in PDH 
HAKSrtHrC V Niagara Mohaut pouer Corp 02/10/01 VA3SALLO- J) D 
Operating Reactor* Branch 2 Ip 15403 002 24X 
Fiche- SO- 220, 82/10/01, 0810050111 



DOCKETED ITEMS 



27 



3210130107 Submit* addl Info to B 20 927 Itr re analysis criteria far 
recircu lation sijs piping replacement Reanalysis criteria 
provides tame margin at original criteria High anergy line 
breal would not affect engineered safeguard sys 

MANtWJ.C V Niagara He-haul Power Corp B2/IO/05 EISENHUT, D Q 
Division of Licensing 3pp 15673 1O1 24X Fiche 5O-220, 03/10/05, 
Q210130107 

8210380144 Informs that review of technical evaluation rent, 
"Comparison of Plant & Model Radiological Effluent Tech 
Speo t- Plant OffsitB Dose Calculation Manual. Nine Mile 
Point Nuclear Station Unit 1," will be completed by 02)130 
LEMPGES, T G Niagara Mohauk Pnuer Corp 03/10/25 VAS9ALLO, D D 
Operating Reactors Dranch 2 lp I5B37 135 24X 
Fiche 50-230, 82/10/25. 82IQ2B014't 



Inspection reports' IE Bulletins b correspondence 



6310080015 Addl response to FOIA requust for 19 categories of infn re 
nuclear reactor events & safety problems Forward a documents 
listed in App A Documents In App D completely withheld (ref 
FOIA Ejemption 5) 

FEU TON. J H Division of Rules and Records 82/07/12 UDELL-H A 
Critical Mass Energy Project fff 15665 027 34X 
Fiche 50-000.02/07/13,0210000019 

--3210030107 Systematic assessment of licensee performance notes re 
facility evaluation for Fab 1 930-Oc t !<?B1 

* NSC - No Detailed Affiliation Given 81/O1/31 3pp 
1566B 003 24X Fiche 50-000, B2/07/ 12, B3IQOB0015 

J210070337 Foruarifs IE Insp Rept 50-330/83-14 on 830801-31 k notice of 
vi o lit ion 

SrAROSTECKI.R Division of Project It Resident Programs 83/09/23 
RHODE.Q K Niagara Mohawk Pouier Corp 2pp 15634 073 34X 
Fiche 30-220. 82/09/22,0310070337 

-8210070342 Notice of violation from insp on B20a01~31 

* Region 1> Office of Director 92/09/22 lp 1S634 075 24X 
Fiche 50-220,03/09/22,8210070337 

-B21007Q3SO IE Insp Rept 50-2.JO/B2-14 an 820001-31 Noneoropl lance noted 
failure to follow radiation work permit r equlrementf for 
full face respirators 

HUDSON. B D , KIBTER.H 8 Division of Project & Resident Programs 
83/09/17 Bpp 1563-1 076 24X Fiche 50-220,82/09/22,8210070337 



S3 10 060 202 Ack receipt of 820324 Itr informing NRC of step* taken to 
improve items identified in Apps A, D t, C at IE Emergency 
Preparedness Appraisal Rapt 50-230/01-10 
SMITH, H Division of Emergency Preparedness (, Operational Support 

82/09/29 RHODE, ff K Niagara Mohauii Power Corp 2pp [5614 010 
24X Fiche 50-220,82/09/39,8210060202 

S21006020B Ruponti-s to NRC B3O332 Itr transmitting IE Emergency 
Preparedness Appraisal Rept 5O-23Q/01-1O Descriptions of 
asiessment/ac t ions to be taken for Improving items 
identified in Apps A. D & C of rept encl 

UEMPflES, T E Niagara Mohauk Power Corp 02/03/24 HAVNES. II C 
Region 1. Office at Director 22pf 15614 Q20 24X 
Fiche 50-220, 83/09/2?. B21O06Q202 

0209190233 IE Info Watica SO-35. 3upnl 1, "Leaking t. Dislodgefl 1-12!) 
Implant Seeds " Svc list encl 

CODB.L I Civilian of Fuel Facilities. Materials d Safeguards 
B2/1O/06 Connol IdiitBd Edlion Co of New Vork 66p(i 1 37 61 3W 

24X Fiche 50-000, 32/10/Oi, H30B190333 

8210210355 Foruads IE Insp Rept 5O-220/B2-I6 on P30324-27 No 
noncomp liance noted 
HflRTIH, T T Division of" Engineering i Technical Programs B2/10/06 

RHODE, K Niagara Mohauik Power Corp 3p p [ 5766 237 24X 
Fiche 50-230, 02/10/0' S2I021025S 

B210210264 IE Insp flept 50-22D/B2-I6 on 020624-27 No noncomp 1 ianco 
noted Major areas inspected inservlce insp program!, 
activities asiocidted o/rec ] rculati nn sys nopJ, i nc lud ] ng 
'jflrfer tralning/nuallf i cat ion leuield 1 proceifures 

GRA.Y.E H , MCBREAKTY.R A , DUHR.J P Region I, Office of Director 
02/09/14 6pp 1S766 239 24X Fiche 50-320, 02/IO/Oi. B21 02IOL>55 

8210390103 Fortmrd* IE Safeguards Insp Flept 50-320/02-19 on D20915-16 
No nnncompl lance noted 
MARTIN, T T Division of Engineering t Technical Programs H3V10/00 

SUNSEH,J J Niagara Moh-auk Power Corp 3pp 1S053 257 24X 
Fiche 50-320. 82/10/00, 3310290103 

--B210290107 IE Safeguards Insp Rept 50-32O/D2-1B on 020915-li No 
noncomp 1 lane a noted Major areas inspected organiiation 
& operation, hipn ing i receiving, storage t, internal control, 
physical invantori/ ft rcorrfs ', repts 

COHEN, I , HOLTNER.E . CODY, A T Dlvisinn of Englniering t, 
Technical Programs S2/10/07 6pp 1SB53 359 24X 
Fiche 50-320,82/10/00,8210390103 



310010157 Ack receipt of 830818 Itr informing NRC of st*ps taken to 
correct violations noted in IE Insp Rept 90-2SO/BS-1Q 
tfARTJIN. T T Division op Engineering t Technical Programs 82/09/2') 

RHODE,0 K, Niagara Kc-hauik Pouor Corp lp 15567 334 34X 
Fiche 50-220, 93/09/24, 82100101S7 

-S3100101&5 Reipondi to NRC 820719 Itr re violations noted In IE Insp 
R*pt 30-230/82-10 Corrective actions safety evaluation b 
procedures for reactor VBSB] recirculation notilt safe-end 
rrplacement reviewed by site aperatloni revieu committee 
LEMPOE9, T E Niagara Mohauk Power Corp B2/OB/10 MARTIN, T T 
Diviiion of Enginenrlng b Technical Programs 3pp 15567 235, 
24X Fiche' 90-220, 82/09/24, B2100IOI 37 

'10010275 Forward t "Systematic Assessment of Licensee Performance 
(SALPhNine Kile Point Nuclear Station Unit 1," for May 1901 
-Apr 1982, utll 820730 Itr re performance improvements k NRC 
B3OA30 raquttt Lilt of SALP 830709 meeting attende encl 
HAVNS,R,C Reaion 1, Office o t plrector 82/09/28 RHODE, K 
Niagara Mohaurk Pouier Corp 4pp 1556B 327 34X 
Ffch* 30-320, 82/09/2B, 9310010375 

82IODI0300 "Byitematlc Assesimvnt of Licensee Performance, Nine Mile 
Paint Nuclear Station Unit 1," far May 1991-Apr 19B2 
Region 1, Office of Director 03/06/32 27 pp 135AB 331 24X 
Fiche 90-220,02/09/20,8310010375 

9210010287 Responds to radiological controls section of 020622 
systematic assessment of licensee performance rept 
Commitments for performance improvements provided 
LEriPOgg.T E Niagara Hoh.uk Power Corp B2/07/SB BTAHOflTECKIiB 

Division of Projact < Residnt Programs 4ap 15368 359 24X 
Fiehe 50-330, BS/09/2B, 0210010275 

1210010294 Inform* of B2070B meeting at site to diacus* NRC 830623 
sys-tiematlc asse*iment of licensee p erforinanei Discussion of 
effort! re radiological control actlvitix should tie 
pre-pared 
BTAROSTECKIiR Division of Project ti Resident Programi 83/06/30 

LEMPOES, T E NUgara Mohauk Pooler Corp, 3pp I556B 362 24X 
Fiche 30-220,03/09/29,8210010275 



02OB19023B IE Bulletin B2--03, "Stress Corrosion Cracking in Thich- 
Ual 1, Large-Diameter , Stainless Steel, Rec ircu latlon Sys 
Piping at BUR Plants " Svc list end 

DEYOUNO.R C Director's Office, Office of Inspection and 
Enforcement 82/10/14 Consolidated Edison Co of Neu York 

lISpp 15810 125 34X Fiche 50-000,03/10/14,8203190238 

0210240177 Ack receipt af B2091 5 Itr Informing NRC of stops taken to 
correct violations noted in re Insp Rpt 50-220/82-06 
HART1N, T T Division of Engineering t> Technical P 1 ograms 83/10/21 

RHQDE.Q K Niagara MoSawk Punier Corp lp 13799 043 24X 
Fiche 50-220, 82/10/21, Q3IO360177 

3310360184 Responds to NRC B2O9I9 Itr re violations noted In IE Insp 
Rept 50-S30/B2-06 Corrective actions personnel surveyed, 
nasal smears taken, meat ing hold in/personnel Si disciplinary 
action taken 

LEMPQES.T E Niagara Mohawk Power Corp 83/09/15 MARTIN.T T 
Division of Enginearing fc Technical Programs 2pp I5799 043 
24X Fiche 30-220, 02/1O/2J , 0210340177 



fl Periodic operating reports d related correspondance 



8210130347 Foruiirds monthli) operating rept far Sept I9S3 

LEMPOES.T E Niagara Mohaufc Pouer Carp Q2/IO/O6 Director's 

Office. Office of Inspection and Enforcement lp 15679 134 21X 
Fiche 30-220, B2/1O/OA, 3210130347 



6210130390 Monthly operating rept for 6*pt 19Q2 

ROMAN, T H Niagara Monaiuk Power Corp, 02/10/05 
34X Fiche 30-33Q.S3/10/06,B21013Q347 



4pp IS679 135 



Rvportable occurrence*' LERs fc related correspondence 



0B10150133 Foruards LER 91-019/OC3L-0 

DARTLETT.J Niagara Monauk Power Corp 01/07/07 ORIER.fl H 
Rvglon 1, Philadelphia. Office of the Director (91/03/01) tp 
15697 083 24X Fiche 30-320,81/07/07,0210150135 



28 



DOCKETED ITEMS 



-9210150142 LEft B1-019/03L-0 on B10607.uJi 1 1 e p?rFori7.( local leal rat. 
tilting- 1-inch F" T '"'**">" valvf 39 ' 11 '""' " 
cwdwur i MM. II" '*"> fal " d to "** Cflu " d " V U rn 
seating t packing ma H * Valve renacled 

NEILO'J Hiajara H^auK P 01 uer Corp 61/07/06 fiioion I- 

rtiUd.ip*"*; a-fi <" - ^rector <BI/03/01> IP I 3697 QB4 
34K Ficfte 50-230. B1/G7./O7, B2LQ1 50135 



B2Q929Q1B9 Fopuardt public version of Revision 4 to generalinj static* 
emergency plan corporate command ctr Emergency Flan 
Impl-i-menting Procedure EOF-3, "Envipon/Emergency 
Coordinator " Receipt form end 

PAJOWBKT.J E Commonwealth Editon Ca 82/09/01 DENTON. H JI HPC 
- Ho Detail til Affiliation Owen lp 133A4 123 24X 
FiChe 30-000, 03/07/16,8209290135 



0210040234 Forward* LER OS-G12/04L-0 -,,, 

LEWCE5, T E Miajara Mnhaul Pntisr Cor[i 02/09/24 

Rtgion I. Office of Director IP 1 5*>21 071 24K 

Fich* so-330. 



-B2100(,029l LEfl B2-OI3/04L--0 on 830H31.lou.Br limit of detection 
s.Rnlivity net met P" several rad lanucl ides in analysis f 
fnh samplei Tech Spec. partite*" tno narrow for uitftrii 
LieifrJtt uniti conversion Tech Epc reunion underujai| 
PAFROU, N Niagara Na^aL I ^ Poi^er Corp S2/09/24 Region 1, 

oVtlc. "f DiUur IP IS63I 072 24X F>cl,. 50-220. B2/09/24. 
B2100602S4 

6210010007 PNO-l-a2-03!C on 5Z0924.MOIU ultrasonic .ndications Found 
in (nErgincii toidenier 5 * pipi-nj * *our in- shutdotio cooling 
5-4S fifing Evaluation ies-ta!ed Indication! due to piping 
n*anetru i not repoT-tatt t B 

MlSTEfl:!! . QRUrmER.E Bfgior, I- 0ic* of Director B2/O9/S7 lp 
ISSfiS I4E 34* FieJis 50-320,03/07/27.0210010007 

8210250121 LEH B3-Q01 ha> >" cancslBil 

COLL [US- H Hiag Hofcawld PDUPP Corp 02/10/19 Bojlon 1- 0**i< 

of Director lp 15837 032 31X F^e^^ 50-220,02/10/19,0210280121 



DDuKEr 50-223 UNIV OF LOWELL RESEARCH HEACTOH 

R FeTiodii operating reports & related correspondence 

G3103BOIB3 Forward* monthly operatmj for June 1783 

HflLLA^E.T Lauill. Unlv at a2/10/2l Director's Office, Office 

of Inspection and Enforcement IP 15037 Oil 24X 
Fiche 50-223.33/10/31,8310380103 

821Q280IB6 Monthly operating r(ft for June 17S2 

LoueU. Univ of BE/ IO/3 1 7pp S5Q37 012 24X 
Fbche SO-223. 32/10/21, 0210280183 



50-23B AEflOTEBT BADIOCflAPHV fr REaEflflCH REACTOR 
F Srcuntij. medical, emergency d fire protettlun plant 



2ti Foruarifi IE [nsp Rept 50-223/62-02 on G30B30 !. 0902 Ho 
noncompliance notBtf 

3DCH.,H E Divnion of Radiologies] Safety !< Safeguards Program 
83/09/15 NEWrtCECK,R flerc-test Qpefatlon* 4pp 15&H 320 24 
Ticfie 30-223. B3/09/ 1&, BSJ 0060126 

--S2100iOI3l IE Insp Rep-t 50-S2BJB3-03 on B2033O-0902 Na noncompllanc 
notsrf HS^OP areai in(ietted radiation p-rotaetion program, 
emtrgencv p]diinin^ program & anvLran monitoring prooram 
CILLIS.H . WEtJSLAWEKli F A . BOOK, H E Civilian of Radiological 
Safety S- 5af,guards Program 92/09/14 Spp f5bl4 324 24X 
Fich* 50-228, ea/0-7/15-B21<X)A<HS6 



B20?290225 Pufillc venlon of Revision 4 ta generating itation 
tinirgincy plan corparate command ctr emergencij plan 
IwpteniflnHnfl Procedure EOF-3, "Envl ron/Emepgencg 
Coordlnatop " 

PAJOWEMI.J E , LITEHSKI.L A , FLESSNER, S A Comrnqnuoal th Editon 
Co B2/OB/31 llpp 15S&4 IS4 24X Fiche 30-000, 62/09/16, 

H309B90123 

B2 1 00 10009 Fo-rmardi info to suppl 620701 req.uost; for eiemption fron A( 
R per B20?l7 telcon Request applies to Sections III 2 a 
t- HI 3 b r Installation of fire suppression GVS 
HAUSCH, T J Commonwealth Edison Co 82/O9/33 EI8ENHUT, D 
Division of Ulcvnilng Opp 15563 1 32 24X Fiche 50-000.02/09/23, 
B2IOO10007 

931013O37t /idvisjt that Installation of offaits dose calculation tit 
prdaTAm fully operational tracking model & operational 
A-niotftl ul|I b deldvad until S2I23I to complete prime 
computac installation 

SWARTI, E D Commonuealth Eifison Co BS/ 10/06 DENTQN. H R U^TK* 
of Nuclear Reactor Regulation, Director 2pp 15602 OS'S 34X 
Fiche SO-000, 82/10/06.0210130376 

S2102'!0047 Releases public version of revisions to Quad Cities, ?ion 
I/ DrBiden emergency plan anneies t. revised generating 
station envrgeiiEU pl-an tolephone directorij 

FELTDN, J H Division of Rules and Records 82/10/00 Doc uininl 

HanagsiriBnt Branch lp 15977 313 34X Fiche 50-000, Q3/1O/OQ, 
S3 10390047 

B21Q29QO&0 Forward! public version of Revision 3 to Quad Citltt b ?l 

em*rjentij plan anne ie, (levisi on 3 to Dresden emergency plan 

annei, Rfvisio-n to &u,ron emei-gency plan annei b revised 

generating station imapgencg plan telephone directory 

MOORE.R CojnrnonuieaLtn Edlion Co 02/07/30 DENTOfJ, H ft UK - 

Ho DetalUd Affilfatlan Given 9pp 150 77 314 24X 

Fiche 50-000, BS/tQ/QB, 0010290047 

--B2I02?QQ77 Public version of Revision 3 to Ouad Cities !. Zlon 
ern'rgencif plan anneiei. Revision 2 to Dresden emergency plan 
annei Si Rtvdion to Byron emergency, plan annei 
Cc-mmonwialth Ediaon Co 83/06/30 lO2pp 15877 31? S4H 
FIC^IB 30-POO, H3-/10/08, 3230290047 

B21029O080 Puftlii varslfln of reviled generating station etnersnc^ pl 

tale-Phone direr tony 

8ALLE, D P Commnnwea 1 th Edison Co 82/08/12 43pp 1987(1 alfl 

24X Fich SO-000, 82/10/OS. 831 0290047 

82102203S3 Providis info T> opganiiation t* perfgrraancu of deptt 
responsible fop radiation protection activi t iea, per B20703 
conrni tment, Tp*inlnj coordinator aisigned in Apr 19QS to 
Improve health phyilcs training programs 

TRAMM.T R C ommoaiu*4) th Edison Co 02/10/14 DENTON, H, R OlHte 
of NucJiar Bttop Regulation, Director 9pp 19776 307 B4K 
Ficha BO-000. aa/IO/U. B21022O3SB 



0310230170 Advlsgi that plans b preparedness for offsite protection 
neap facility adequate & uifl! be tpplied in event of 
TJd iolu-g I cl imtratncij 1L State (< local plani approved subj 
to verification of adequacy of alerting & notification tijt 
THOMrtB.L M Fidaral Emepgrncy Management Agency B2/IO/14 
DIRCKB.M J Office of the Executive Director for Operations If 
1S7B3 HB5 Z4X FlcliB SO-010, 02/10/14, B210230170 



Ad juflicatary carp*s pond* nee 



0210010257 Decision M.AD-695 affirming LBP-01-37 t> L3P-B2-65, 
ianctiorino mod to OL far Unit 3 to permit installation at 
five hlgA rftniitv spent fuel storage racks t authoriilng 
iiii/*nc o-f amends to OL) , respective] ij 

TOUPHIHS.? A Atomic Safety and Licensing Appeal Panel 
Spp 13574 03 24 X FlcJiv 30-237, 02/09/39. BS10010237 



P Opir'feing license stage dectimenti ti corpelpondrnce 



8210080001 Adviies that board natiflcatlon issued on 620903 rt an 
aualliari; overhead crane rattier than main overhead crane to 
move spent fuel pool racks ihauld have been issued u/Mumbr 
BN-ea-93 

MIRrtOLIA.F. An is taut Director for Safety A.nssirmnt 02/09/14 
Atomic Safttv antf Licenilnt Board Panel 4pp 15660 341 24K 
Fiche 90-237. B2/09/14, 8S10080001 



DOCKETED ITEMS 



--02100B0002 Board Notification 8S-92 informs of util failure to carry 
out fuel pool rack removal & Installation in manner 
described in testimony at hearings Aimliarv overhead crane 
used instead of redundant main overhead crane 

IPPOLITO, T A Assistant Director for Safety Assessment 03/09/03 
Atomic Safety and Licensing Board Panel 3pp 15468 343 24 X 
Fiche 50-237. B2/09/I4, B210080001 



B21O250203 foruai-di preliminary draft of integrated plant sa*eta 
assessment re pti Chapter" 4i "Integrated Assessment Summary " 
Enc] draft Includes commitments lubmitterf In response to NRC 
830715 Itr 1 assessme-nt moe-ting* 

CRUTCHF1EUD. D Oprating fteac Irora Branch 5 83/10/15 DELOEQRGE, L 
Camrooniuojlth Edison Co 60pp 1S7B9 204 24 X 
Fiche 50-237. 83/10/15. 0210250303 



--B2Q9210383 Recommends board notification re util use of auiiliary cram 
instead af main redundant crane to install fuel racks, as 
described in testimony berore A5LD Licensee has committed to 
rol low testimony in completing remaining work 
IPP0LITQ, T a Assistant Director for Safety Assessment 82/09/03 

EISEtJHUT.D C Division of Licensing 2pp 1 566B 349 241 
Fiche 50-237,02/09/14.0210080001 



8210250155 Foruardi corrections to proposed Te-ch Spei Pages t S fS 3-1 : 
3,3/4 3-5r supporting rrvieu of future reloads b revised 
Fig urn 3 5 IrSheet 1. providing extended MAPLHOR vs eiposur" 
curve* for barrier lead test assembly fuel 

RAU5CH, r J Commonwealth Edison Co 82/10/10 DENTDN, H R Office 
of Mud ear Reactor Regulation, Director 2pp 157BB 233 24X 
Fiche 50-000, 02/10/13,8210350135 



B210G50309 Forwards final safety evaluation of SEP Topit VI-4, 
'Containment Molation Sijs " Evaluation ui 1 1 toe basic input 
to in Be gated safety assessment Differences from current 
criteria 1 is ted 

CONNOR. P Operating Reactors Branch 5 02/09/24 DELCGORGE,!. 
Commonuealth Edison Co 2Bpp 15609 184 24X Fiche 30-237, 
82/09/24,3210050309 

B210120105 Requests delay of implementation due dates re NUREO-0737, 
Items II D 2. "Plant Shielding." II B 3. "Post-Act Idunt 
Sampling 1 (. I I F 1 1. "Noble Oas Effluent Monitor " 
SWARTZ.E D Commonwealth Edison Co 02/10/01 EISENHUT,D 
Division of Licensing 5pp 15*51 237 24X Fiche 50-000,02/10/04, 
B3IOI201Q5 

SS ! 1 9O4&4 Informs thJt mods to BRP Section 8 3 2 re SEP Topic VIII-3 
on dc power sus bus voltage monitoring & annunciation 
initiated Mods uill provide battery voltage indication In 
control room & mill replace process computer 

ftAUSCH, T J Commonwealth Edison Co 03/10/05 O'CONNOR. P 
Operating Reactors Branch S Ip 15740299 24X 
Fiche 50-237,62/10/05,8210190164 

6210260526 Forwards Revision 3 of Chapter 9 of "Qffslte Dose 
Calculation Manual " 

CDLOEM, J C Commonwealth Edison Co 03/10/06 CASE, E Office of 
Muclenr Reactor Regulation, Director 2pp I5QOS 137 24X 
Fiche &0-000. 02/10/06. O21O260526 



B21O250177 Errata t Addenda Sheet a. replacing Page q-IO to lh LDCfl 
AnlV>ii Dept for Dresden Uneti 3 t, 3 t/ Qusd Cltiss 1 & 2 
Nucliar Pougr Stations " 

general Electric Co NEDD-24I16A EI1R OB 82/09/30 Sop 
13788 239 24JC Flche 50-OOO, 02/10/18, 93102501 55 

B21Q2S0069 Provid ddl info re reactor uatET- cleanup room are-a tmp 
monltori Temp elements causer no automatic plant response 
beyond control room alarms 

RAUSCH, T J Commonwealth Edison Co 02/10/17 E1SEWHWT.D Q 
Division of Licensing 2pp I 57B7 Ofil S4X Fiche 30-000,82/10/19, 
8210230069 

e310260495 Provides addl info re actuation of relief valve PRV 
2-i201-8O on reactor (uater cleanup sys Eiuting 
configuration adequate to handle transient ui/o nither 
reactor scram or reactor water cleanup overprasourilation 
RAUSCH, T J Commonweal th Edison Co 82/10/19 O'CONNOR, P 
Operating. Reactoi-i Branch 5 3pp 15807 257 24X 
Flcha 50-237, 82/10/19, 8S103A04B5 

021026O296 Formard* safety evaluation of DWR ouners group gener!* 
renpante to NUREO-0737, Item II K 3 25, "Effect of Lois of 
AC Power on Pump Seals " Ma (nods to seal cooling for 
ree ircula tion pumps required Item resolved 
CHUTCHFIELD.D Operating Reacton Branch 5 82/10/21 DELOEOJ?OE,L 

Commonuiealth E<flson Co 7pp I SaOD 018 24X Fiche 90-237. 
82/10/21, 6210260296 



B210260S42 Revulon 3 of Chapter 9 of "Offsite Dose Calculatlo 
Manual " 

Commonmealth Edison Co 82/09/30 93pp 15805 135 SIX 
Fiche 50-000, B2/10/06, 821026052i 

3S10130326 Comment! on proposed scope of Phase III of SEP as reflected 
in individual topic definitions appended to 020909 I tr 
Staff encouraged to develop t Implement means to incorporate 
po.itivc attributes of Phase III in licensee/NBC Interface 
KACICH.R M SEP Owners Group B2/10/07 EIBENHUT* D Divlaton of 
Litensing 7pp 15682 179 24X Fiche 50-000, 83/10/07, B2I0130326 

3210180059 Provides addl guidance 6 clarification re 030806 request 
for addl info per NUfEO-0737, I tern II Q 3, "Post-rtcc ident 
Sampling Si;s " Detailed reliability analysli not required 
to satisfy NRC concsrns 
CRUTCHFIELD, D Operating Reactors Branch 5 82/10/OB DELOEOROE, L 

Commonweal th Edison Co 3pp 15720 004 24X Fiche 50-000. 
B3/1 0/03,8210100039 

*210I90563 Responifa to SEP Topic IH-4 Di "Turbine Missiles " Visual t 
fiber optic eiams revealed uiater cutting In line u/keyuiay* 
on hub uheels 

RAUSCH, T J CommonuiBalth Edison Co 02/1O/OB O'CONNOR,? 
Operating Reactors Branch 3 2pp 19736 135 21X 
Fiche 50-237. Sa/IO/OS, 8210190S65 

'2IO190680 Forwards safety evaluation of licensee 820414 b 0611 
responses to NUREO-0737, I tern II E 4 2. "Purge/Vent Valve 
Isolation Dependability " Responses acceptable Topic 
review tomp le ted 
CRUTCHFIELD,D Operating Reactors Branch 5 82/10/13 DELOEOROE. L 

Commonweal th Edison Co Spp 15738 192 24X Fiche 50-237, 
82/10/13- B310190680 

2101904-15 Forwards supplemental response to Generic Ltr B2-05 re 
implementation status of NUREQ-0737, I terns II D 3, 1 1 F I 2, 
II F 1 3, II F 1 5 i II P I 6, in response to BB1006 requet 
SWARTZ.E D Commonwealth Edison Co 92/10/14 EIseNHUT.D 
Division of Licensing Spp [5741 202 24X Fiche 50-000, S2/10/14, 
B210I90445 

210220335 Forward* info re NUREO-0737, I tern It D 1, "Perf ormnc e 
Testing of BUR Safety/Relief Valves," per 820727 request 
Info adequately demonstrates applicability of result* of EWR 
owners group generic test rept NEDE-249S9-P to facility 
SIMRTZ.E D Commonwealth Edison Co 82/10/19 EISENHUT, D 
Oiv.sion of Licensing 17pp 13776 Oil 24X FUhe 50-237,02/10/19, 
B210220335 



Inspection reports, IE Bulletins !< c orresponrience 



0310060329 Forwards IE Imp Repti 50-010/68-02, 50-S37/B2-03 & 
50-249/S2-O3 on B20119-O218 Mo noncflmp J ianc e noted 
LITTLE, H 3 Division of Engineering t< Technical Program* 

REED.C Commonwealth Edisan Co Sp-P 15419 331 24 X 
Fiche 30-010, 82/07/a3.9S100A0329 



821O060335 IE InBp Repts 30-010/82-02. 50-237/82-03 S. 50-1349/02-03 on 
8Z0117-0318 No noncomp 1 lane e noted Major a mas InafectBil 
open 1 unresolved Items & Items af noncompl iance re 
integrated leak rat a test 

RETIHAUN-F H Raglan 3r Office of Director JACK 1 H, I N Division 
of Engineering & Technical Programs 02/07/31 7pn 13*15 333 
24X Fiche 30-010IB3/O7/22.B210O60329 

6210130533 Forward* IE Inap Reptt SO-O10/82-1 3, 30-337/82-17 
50-247/02-1B on B20708-OB09 & notice of violation 
BTRGETER, J F Division of Project ti fleudent ^rograiniB 
REEO.C Commonui*lth Ediion Co 2pp 13713 O97 r" 1 " 
FIcfi" 30-010- 82/0?/28,eaiOI50S23 



B210I3093B IE Insp R.pts SO-0(0/G2-1 3, 50-237/02-17 S< 
8SO70B-OS09 Noncomp 1 lance noted failure to iiiue & 
ir pressure teit procedure 

TONOUE.T M , JORDAN.M J r WALKER, R D Division of 
Resident Program 53/09/28 Bpp 157(3 1O2 S' 

Flch. SO-010, 82/09/38, B210130523 



9210060359 Act ncBipt af 320910 1 tr Informing NRC of i 
correct violation! not*rf In IE Imp fiopti SO-237/B1-C 
50-249/81-32, 90-SB4/Bl-2-3i 30-263/81-23. 50-295/BI-31 ( 
30-30^1/81-29 

SPES9ARD<R L Division of Project ( Resident Progr*n 
REED.C Commonuefllth Edlcon Co Ip 15618 334 24 
Fiche. 50-OOOr 82/10/01,6210060339, 



0aioO60347 R*ipondt to NRC S207IB 1 tr re vloUtloni n 
Rep t 50-237/BI-39, 50-249/BI -32, SO- 2-54/8 1. -33, SO-B63 
30-293/01-31 i< 30-304/BI-i??- Correttive action* trl 
mgt priorities re plant availability mill be contfuc 
REED, C Commonwealth Edison Co B3/07/10 KEPPLE 
3, Office of Director 13pp. 15618,385 24X 
Fiihe.SO-OOO, 02/10/01,0210060339, 



30 



DOCKETED ITEMS 



a2100BOI7a Forwards listing of piping su which fail to meet FSAR 
requirements, per (IRC BOOB IS con-f I rmatariy at t ion I tr IE 
Bulletin 79-14 operabllltu evaluation updntts taill not be 
provided far Dresden & On ad Cities Final update by Die I9B2 
RAUBCH.T J ConnonaiBjlth Edison Co B2/10/QI HEPPLER.JG Region 
3, Office of Director 6pp 15-640 159 24X Fiche 50-000.62/10/01. 
B21008017B 

B2101S0539 Forwards IE Ino Rpti 50-QE 0/B2-1 5. 5Q-237/B3-I9 t 
50-249/93-20 an 82QB3O-0903 No noncoirijilianc e noted 

PAPFRfELLOi C J Division of Encrgfncij Preparedness 1 Operational 
Support B2/10/O1 REI>, C Cojnmonutalth Edison CD 3pp 
[5714 17S 24X Flcn 30-010,02/10/01,8210150539 

--B31015O543 IE Imp Kept* 50-OIO/B2-1 3, 50-237/82-19 i 50-249/03-20 on 
820930 -O9O 3 i 09 No noncompl lance noted hajor ara-ai 
intpect-ed c. onf irma torij meanjr tntintf program. OC program tor 
analytical mesuremnt ti environ monitoring program 
SCHUMACHER. (1 C . NICHOLBON.N A . JANUEHA, ft O D(vl*lon of 
Emeroencij Preparednsss !. DacT-ttional Support 62/09/30 7pn 
15714 177 S4X Fltlit 50-030. S2/1O/OI,B31 0130339 

H2100o0266 Confirm* 021103 enfor<*nont confeTinte at Region 3 oft re OA 
jiptcts associated u/prac urenent, Inttal lati on S, use of 
non-qual 1 f i ed valve guida-i ir B I (ctranujnet ic relief valves 
at facilities 

SPESSARD.R L Division of Projict ( Resident Program* 63/10/04 
REED, C Commonwealth Ed 1 sen Co I? 1564Q. !B1 24K 
Fiche 30-000, 62/lO/04,a31OOaoi"!0 

831008019O Con Firm B21103 enforctfnint confr<nce at lit 5, ion 3 ofc re QA, 
aspects, aiinc [ateri u/proc urement. In-stal latf on ti use of 
non-qualified valv* guidrs tr I tctn>magnt i c relief calves 
at facilltiaa 

SPESSARD. R L Division of Projict t Rendent Programs B2/ I 0/04 
REEO,c Caminoniutalth Edison Co I p 15MO IB1 24X 
Fiche 50-OOO. 83/10/04, OaiOQBO HO 

8208190233 IE Info Hotlce 30-39. Sup pi 1. "Leaking & Dislodged 1-125 
Implant Sitdi " SVE list ancl 

CDBB,L I Divulon of Fuel Faciliti**, Mittrials i Safeguard i 
ea/10/OA Conolidted Editon. Co of Niu Vark itpp. 15761 25O 

24X Fiehe 50-000. B3/ IO/OA. 820B190833 

BSO&19023B IE Bulletin 92-O3, "Btreii Corroiion Cracking in Thlck- 
Wall, Larg-Dlam*t>T>Btainleii St*el , Ret irtu lation EIJI 
Piping at QWFt Plant! " Svc lilt etit i 

DEVOUNO'R C Dirtctor'n Oiftti, Office of Inspection and 
EnforcBmtnt eS/IO/14 Coniol itfattd Ediion Co of Ueiu Vor I 

119pp 1981O 1E3 24K Flchi 90*000.62/10/14,13309190233 



R Periodic operating report* 4 related ccrreip-onienc e 



8210130097 Foruardt manthlij operating repts for Sept 1<?S2 

SCQTT, D J CommonnrBalth Ediion Co B3/10/01 Director's Office, 

Office gf [npction and Enforctment 1p 15719 001 24X 
FichR 5Q-OSO. B3/10/01,B210180097 



8210<H01BB FofniariJi LER B2-040/03L-0 

SCOTT, J Commonwealth Eduoti Co S2/09/ 1 5 KEPPLER. J Jtijipn 
3. Office of Director Ip 1 55B3 164 24X Fiche 50-237, 62/ Off 13, 
S2IOO4016B 

S3I0040189 LER B2-040yt>3L-O on B20B30, valve Z-I601-33A eihUI ted 
oindlng during movement uhile performinfl torua-drgue 1 1 
vacuum braler operjbititij test (DOS 1600-7) Cause not 
determined Repairs to be made during neit outage 

NEE, D T C Dromon wed 1 1 h Ed lion Co B3/09/15 Region 1, Oftici cl 

Director 2p p 155&3 IfiS 24X Fiche 50-237, B3/09/I 5, Q2IOO40 169 

8210050237 Faruardi LER &2-03B/03L-0 

5CDTT, D J Commoniueal th Ediion Co Q2/09/S2 KEPPLER, J a Pp^icn 
3. Office of Director Ip 1S411 O26 2fl X Fiche 50-237,02/09/32, 
3210QS0227 

B2100S0233 -LER B3-Q3BJQ3L-Q on 83082, during MS IV timing turvdUanu 
valves 2-203-IC t- 2-203-1D had closed times of 2 2S-s t, 
2 67-. rupee 1 1 velij Caused bij timing mechanism drift Valve* 
adjusted 

RhfEE, B ommonuiHalth Edison Co 62/09/22 Region 3, Gffui cl 

Director 2pp IS611 O37 24X Fiche 30-237, S2/O9/22, 6310050M7 



led due to brolen 

spray ing tuattr 
nf ormer 



B210040190 PWO-1II-B2-101 on B20BS4, p lant tri 
ust*r line to generator hydrogen cooling ag 
onto current tr*n*farnnr Line repaired & tr 
replaced 

TDNSUE. T , WALKER. R . STREETER. J Region 3, Office of Director 
83/09/27 l(i 15393 167 24K Fiche 50-237.82/09/37,0310010170 

3310250266 Fnruards LER e2-04a/03L-0 

SCdTT.D J Comflioniuealth Ediion Co Q2/10/12 KEPPLER, J fltflni 
3. Office of Director Ip 15791 145 34X Fiche 50-237,03/10/13, 
S2 10350269 

--621035037B LER 83-042/03L-O on 820930, contro I rod drive H-IO o^trtu. 
*lirn annunciated & rai pontion indication lost Caused bi/ 
uncnupld inn*r filter Drive recoupled at greater than 30V 
power Drive will be overhauled during neit refueling outage 
HOLLAND, F Commonwealth Ediion Co 93/10/12 Region 3. UUitt 

gf Director 2pp 15791 146 34X Fiche 50-237,62/10/13. 
8210350268 



0210250233 Fnr<j*rd LER 62-013/011-0 

SCOTT, D J Comnonueal th Edlton Co S2/1O/M KEPPLEH.JO (trjion 
3, Office of Director lo 15791 102 2-1X Firhe 50-237, D3/ 10'H, 
B3102S02S3 

--B2I0230296 LER B2-042/01T-0 on 021002, s igh tg lasa isolation t vert 

vilvti reported open u/no indication of BICBSC makeup 

Calculatloni Indicate leakage uai in eicen of Tech Spec 
Caused by operator error Valves closed 

HDL L AND. P Commonuiea 1th Edison Co 62/10/H Region 3, OtMci 

o* Director 3pp IS7?1 103 34X Ficha 50-237, B2/10/lfl. 
62102S02B3 



--Q210I8O100 Monthlv operatins rtpti for Sept 1983 
SCHRQEBERiB A Commonwealth Erf 1 son CD 02/10/01 
15716 O02- S4JI Fiche 50-010,03/10/01.9210180097 



DOCKET 90-344 ROBERT EMMET BINNA NUCLEAR PLANT- UNIT 1 
F Security, tnidlcal, emergancy ft fire protection plans 



S Importable occurri-nces. LEBs d related coTrespondenc* 



8210150044 Forward! LER S1-O59/03L-0 

SCDTT, D J ConnonuiBalth diton Co 81/10/09 
3. Chieaoo, Office of the Dlrettor {31/03/011 
Ftche.30-237. 61/10/08,8210190044 



KEPPLER, J Region 
Ip 13701 136 24X 



B2101 50049 LER 81-059/03L-O an 8IO?IO, uhili comJuctlnj) imp on pump 
2A.CCSW outboard bearing found burned out Caumed 61; lack of 
lubrication In iraled bearing During replacgd* 
Z3RHAS, H R Connanuealth Edison Co Bl^lO/oa Rigion 3i 

ChU*gp, QfMci of 6h J)ir*ctir (BI/03/OI) Sao 15701 127 H4X 
FlcA* 30-337,81/10/03,8210130044, 



610k50&21 Relnaiei public version of revision to emergency plan 
implementing procedures 

FELTON.J H Division of Rules and Records 62/09/30 Docuntnl 

Management Branch Ip 15717 064 24X Fiche 50-344, B2/OW30, 
8210130431 



--&21015Q&43 Foruardt public version of revision to emergency plan 

Implementing procedures, including Procedure 5C-41 1 r* NY 

State usrnlna point tBl t ti Procedure SC-'llO re insp of 
emaTgincu equipment 

MAIEft.J Rochester 0i ti Elettrlc Cnrp 62/09/23 

CRUKHFIELD, Q Qp-erating Reactors Branch 5 Ip 15717 04 5 
FUhe SO-244,B2/Q9/30.BE10130fi21 



6EIOOBOOIS Add I nsponse to FOIA ren.gst for 19 categories of info re 
nuclear reactor vents t safety problems Forwards documents 
listed in App A Docunents In App B conplettlu ulthhild (rif 
FO I A Eiemption 9) 

FELTON. J,M Division of Rulei inif Record*. 8J/07/I2 UDELLrfi A 
Critical H*t Eneroy Project 9pp Bi65 027 24X 
Flchl 30-000, ea/07/ia,BSIOOBOOi3 

-S210C-BO197 NRC operation* ctr uiige ehrt re events t fitUUU* 
HI NRC - No Ditilted AffiHetlon Olven 82/07/13, Ip 
24X Fiche SO-000, Ba/07/la.flaiOMOOl9 



B21OI5O64B Public version of revision to emergency pl>n implement**) 
prociduresi including Procedure BC-411 re NV State yarning 
point phone test ii Procedure SC-410 re insp of emergency 
equij ment 

BODIKEiJ C , SPECTER.B M Rochetter Oas & Electric Corp 
92/09/20 4Spp, 15717 066 24X Fiche 50-344,62/09/30,82101504?! 

B21O19QSBO Ack receipt of B20224 Itr informing NRC of steps taken U 
ic-rreet violations notBrf in IE Imp Rept 30-244/B1-22 
ALLAN, H Region li Office of Director 82/1 0/O7 HAIER.J E 
Rocn*ttr Oat f Electric Corp Ip 1S739 307 24X 
Fiche 30-244,32/10/07,6210190380 



DOCKETED ITEMS 



31 



-- 0210190591 Responds to NHC BI1215 Itr re violations noted in IE Insp 
Rept 50-244/01-23 Corrective actions emergency plan training 
program Mill be realigned by 620115 to be consistent u/ 
functional area requirements 

M41ER,J Rochester Gat t, Electric Corp B2/02/24 HAYNES. ft C 
Region 1. Office of Director 4pp 15739 3QB 34X 
Ficne 50-244. B2/1O/O7. 6210I905BO 



--8003310I79 Forwards NIC evaluation of use of four miiett oiide fuel 
ailemblivi lor Cijc IB 10 Ufc of a*emliliei is acceptable u/nu 
changes For future cycles NRC mill require, increase in 
nuclear uncertainty re total pe-aking Factor 

CHECH, P B Reactor Safety Branch 00/03/11 2IEMHNN.D L 
Operating Reactor* Branch 2 (Pr 80042BI Qpp 15727 O3<b 24X 
Fiche 5O-000, S2/Ot/2B, 0210G10QO8 



--3210190618 Responds to NBC 911215 Itr re violations noted in IE Insp 
Rept 50-244/81-22 Corrective actions clarified required 
aition, eliminated existing ambiguities, inconsistenciei b 

MAIFR.J E Rochester Gas t, Electric Corp 02/04/19 HAVNE6. fl C 
Region I. Office of Director 2pp 15739 312 34X 
Fiche 50-244,02/10/07,6310190580 



8210120103 riddl response to FOIA requeit for nina categories of recordi 
generated by present NRC Comnis i loners, prlmarl Ig Cnairman 
Palladino tt Commlsi inner Roberts & White House Forward* 
App B document* 

FELTON, J M Division of Rules and Records 62/07/12 UDELL, rt A 
Critical Mass Energij "roject 3pp 19690 117 24X 

Fiche 5Q-OOO, 03/07/12,8310130103 



--Q3fOI9063/ Responds to NRC B20530 Itr re violations noted in IE Insp 
Repl 50-244/81-23 Corrective actions committee established 
to evaluate & inventory supplies Rept will oe submitted 
by 621231 

MAIER.J E Rochester Gas (, Electric Corp 82/06/30 SMITH, hi 
Division af Emergency Preparedness * Operational Support 22pp 
19739 314 24V Fithe 90-244, 92/10/07. B21 O1905BO 



B21QIEQL31 Agree* u/polnt raised 1 in 820201 in a mo re NIC incident 

response program Point* raised bij staff mill be addressed 
in rept on le*son learned 1 at incident response ctr from 
fan i 1 I ty event 

PALLADINO, N J Commissioners B2/02/16 RDDEHTS, T M 

Camiiisiioneri Ij 1 9i9O 13B 34* Fiche 9Q-OOO, B2/07/1 3, 
82101^0103 



--B2IO1'?0447 Responds to NRC 611215 Itr re violations noted in IE Infip 
Rept 50-24-t /Bl-22 Corrective actions revision of Emergency 
Plan SC-1 completed prior to startup after 19B2 refueling 
shutdown 

HAIER.J E Rochester Oaa 1 Electric Corp B2/10/07 HAVNES. R C, 
Region 1, Office of Director lp 15739 336 24X 
Fiche 50-241. Q2/10/07, B2101905BO 



8310070007 Respond* to FOIA request for eight categories of records ro 
steam generator" & steam turbines App A documents provided 
in R Udell FOIA Request 81-313 Foruards documents listed in 
App B 

FELTON, J M Division * RuUs and Records B2/0&/10 LONQ, D J 
Minthrop, Sttmson, Putnam t- Roberts 9pp 15645 063 34X 
Fiche 30-OOO. 62/C-a/10,a2I0070'007 



6210210212 Ack receipt n F 821015 ! tr informing NIC of steps taken to 
coirect violations noted in IE Insp Rept 50-244/63-15 
STARQSTECHI.R Division of Project ! Resident Programs B2/ 10/25 
MrtlER.J E Rochester Gas 1 Electric Corp lp 15B53 279 24X 
Ficfte 50-214. aa'10/35, 0210290212 



-0203170310 Foryardt background summary of operating eiperience iu/ 
stean genoratoTi prior to 080125 tube rupture 

JOHNSTON, W V Aiaistant Oirectcr for Materials & Qualifications 
Engineering B2/QI /2B LAINAS.fi C Assistant director for Safo 
Asueumtnt Spp 15645 10-) 24X Fi che, 50-000. 62/03/10- 
0210070007 



--8210^90317 Responds to NRC 630914 Itr re violations noted In IE Insp 
RepL 50-244/92-15 Corrective actions situation reviewed 
4 determined to be Isolated case Further action unnecessary 
MAIII,J C Rochester Gas t Electric Corp S2/10/19 ERUNNEH.E J 

Region 1, Office of Director 2pp 15853200 34X 
Tiche 50-2441,82/10/25.0210290213 



Adjudicator^ correspondence 



62102110060 Updates B20730 status rept on MRC issuances Final integrated 
plant safety assessment rept to be issued on 021039 
Conversion safety evaluation rept d update to FES to 6e 
issued in Nov 

VQUNG.M A Hearing Dranch 4 B2/IO/26 OfiOSBMAN, H , LUEBKE.E A . 
fiDLE.R F Atomic Safety and Licensing Board Panel lp 15937 263 
24X Fiche 50-244. 02/IO/2i, 6210290060 

O Advisory Committee on Reactor Safeguards reports (. correspondence 

8200290010 Summariios 260th ACRS meeting on B2Q81S-14 in Washington, DC 
re full pouier OLs For Orand Oulf I '- Watts Bar I & II, 
systematic evaluation ', integrated reliability assessment 
or Gmna ! control roam habl tab i 1 1 ty 

SlfEWHON.P ACRS - Advisory Committee on Reactor Safeguards 
82/03/06 PALLADINQ.NJ Commissioners 3pp 15649233 34X 
FlchO 50-000. 82/OB/26. 6300390010 

B2101B0074 Foriuards B209I7 response to ACR8 comments t, recommendations 
per facility SEP revieiu 

CRUTCHF1ELD, D Operating Reactors Branch 5 03/10/07 MA1EH.JG 
Rochester Gas fc Electric Corp 2pp 15719 347 34X 
Fiche 50-244, Q2/10/07. B2I0100071 

83101600B3 Responrfi to ACRS 02081 B comments & recommendations re 
facility SEP review Draft NUREQ-0821 uil 1 1 be revised to 
reflect agreements 

DENTON.H R Office of Nuclear Reactor Regulation. Director 
62/09/17 SHEWMON.P S ACRS - Advisory Committee on Reactor 
Safeguards 2pp 15719 349 24X Fiche 50-244, S3/10/07i 
0310190074 

P Operating license stage documents b correspondence 

9210010008 Responds to FDIA request far 19 categories of document* re 
nuclear reactor events & safety problems Foruards documents 
listed in App A 

FELTON. J rl Division of Rules and Records B2/O6/38 UDELL -R A 
Critical Mas Energy Project 15pp 15727 005 24X 
Tiche 50-000i B2/06/2B. 821001000B 



-0202240397 Submits daily highlight re 820203 Insp of steam generator II 
to determine location of BSD 129 ruptured tube event Eddy 
current tests performed on tube near periphery on hot leg 
ild & four adjacent tubes 

LYONS, J E Operating Reactors Branch 5 B2/02/O3 DfNTQN.H 
CARTER, J , EIBENHUTrD NRC - NP Detailed Affiliation Oiven lp 
15645 039 34K Fiche 30-000,63/08/10,8210070007 

-S203020267 Submiti dallv highlights For B2021O meeting w/util ro 
requiremBTit s far restart Pi-tor to restart, util should finnh 
fiber optic imp of secondary side of B steam generator h 
obtain dssignir opinion on effects of plugging 

LYONS, J E OparatinJ Reactor* Branch S 82/02/11 DENTON.H F? , 
CARTER, J , EIBENHUT, D NRC - No Detailed Affiliation Olvan lp 
1S645 092 34X Fich*- 50-OOO, 83/OB/IO, B210O70007 

-B2030405O2 Submiti dailij highlight re television insp of D steam 
generator revealing mis singi partial ly mliilnig !< damaged 
tubes d presence of foreign object's Meeting tu/NRC planned 
LYONS, J E, Operating React&rs Branch 3 B2/02/19 DBNTON. H i 
CASTER, J . EI8ENHUT, D NRC - No Detailed Affiliation Olven, lp 
15645 O9i 2flX Fich* BO-OOC-, 82/OB/ I 0, 8310070007 

-BB03100S93 Submltii dally highlights re imp of ruptured tube usino 
fiber optics rive-Inch kite shaped rupture caused liu, tfcre-as 
corroiion linked to differential eipan*ion batueen tuba ti 
tube urjpper uedge Tube being plugged 

UVONS.J.E Operatino Reacton Branth 5 02/03/03 OENTON.H . 
CARTER.J , EISENHttT, D NRC - No DBtailed Affiliation Qtvon lp 
19645 0<?1 84X Fiche SO-OOOr 83/OB/ 10, SS10O70Q07 

-8203110334 Submits highlight* re fiboT optic Inveit i gatl on of leconiljifg 
(id< of B team geneTatnr revealing damage to previously 
plugged tubei Preltmlnary indicatiors ihou one tube severed 
Investigation of peripheral area continuing, 

LYONS, J E Operating Reactors Branch 5 02/03/12 DENTON.rl > 
CARTER, J , EISENKUT.D NRC - No Detailed Affiliation Olvon lp, 
1S64S 094 24X Fichff SO-OOOj B2/OB/1O,B31 007O007 

-920311033'? Submit! daily highlight* r Insp or periphery of B atflam 
generator hot leg Inip remit* indicate appro i 7-10 
previouly plugged tubm in peripheral area leverly darvagad 
TV insp planned for A t< B generator*. 

LYONS, J E Operating Reactors Branch 5. 32/02/1 A DEfJTDN, H 
CARTER.J . EIBENHOT, D NRC - No Detailed Affiliation Oivin Spp 
13i4S 093 24X Fich" 90-000183/08/10,0310070007 

-B2031I04O3 Forward* rpi>nse to JD Dumele, chairman of Pollution Control 
Board, State at ILi questions In S3OI 27 Itr 

JOHN8TON,W, V A*ii*t*nt Director for Materials Si Ouali t ica tion* 
Engineering BS/Ot/SS. LATWAS, 0, Aniitint Director tor Safety. 
Alsessmint, 2pp, 13445 IBi 24X Fiche, SO-OOO, 0H/OB/10, 
8210070007.' 



32 



DOCKETED ITEMS 



-8306070250 Forwards Operating Reactors Assessment Branch input for 
Oinna restart afetg evaluation rept. Section 5. re (team 
generator tnsp program, failur * analysis t. repairs 
IPPDLITO, I-A Operating Reactors Assessment Branch 62/05/13 
CRUTCHFIELD, D Operating FJeacton Branch 3 43.pp 1 5445 I3B 
24X Fiche 50-000. S2/08/ 1O, B31 0070007 



B210Q10444 Responds to NBC 8209O2 request for review of NUfl.EO-0737, 
Item II B 3i ' J Po* t-Acc ident Sampling " Criterion iiiili be 
adequately addressed bu. 830213 
rtAIER. J E Rochester Oas Electric Corp 82/09/33 CflUTCur 1FLO, 

Operating Ruacto-ri Branch 5 lp 1 5S7O 174 SIX 
Flche 50-244. B2/09/23. B21O01O44'! 



-82062'?OA55 Forwards Mechanical Engineering Branch input to re 
Sections 4 S through 4 0. 5 l.S 3.5 4, 61 & 62, per 820433 
request 

HNICHT.J P Assistant Director for Components t. Structures 
B2/O6/15 LAINftS.Q C Assistant Director fc 
I3pp 15i45 153 24X Fiche 50-000, B2/QB/IQ, 



En 9 ineen.no 
Asses srtient 
B2!OD7OOQ7 



Safety 



-8210070030 Util handout from 820210 meeting u/NRC re 830125 steam 
generator tuba rupture at facility 

* Rochester Oas & Elatr-lc Corp 82/03/10 I7pp 1SM5 O72 
2AX Fiche 50-000, B2/GB/ 10, 621 0070007 



-6210070069 Submit! daily highlight re H20210 meeting u/util concern] 
requirements to 6 e met prior to restart of facility Ho 
suFfi-clent baafi presentad at this time to permit plant to 
return to operation 

LYONS, J E Operating Reactors Branch S B2/03/ I 1 DENTDN, H , 
CARTER, J , EISENHUT, D NRC - Ho Detailed Affiliation Given lp 
15645 -093 24X FichH 50-000. S2/OB/ 10, 82I0070DO7 



-8210070073 Submits dailij highlight re util 620319 press conference 
presenting updat-e on recovery activities at facility 
Muting lu/NRC icneduled tar SSQ303 

t.VONS.J E Operating Reactors Branch 5 B2/O2/22 DENTON. H . 
CARTER, J , EIBENHUT.D NRC - No Detailed Affiliation Given lp 
15645 077 34 X Flche 50-000, 62/OB/ 10, 0210070007 



9310010337 Forward* application to amend App A of License DPJ1-10 i. 
proposed Tech Specs to permit reorgan I lation of plant staff 
HAIER. J E Rochester Gas fc Electric Corp B2/09/S8 DENTON, II fi 
Office of Nuclear Reactor Regulation. Director lp 15574 14-1 ?*.< 
Flche 3O-244, B3/O9/3B.B2100I0357 



Bai001O3&5 Application to amend App A of License DPR-18, c hanj i 
Specs to permit reorgan i lat ion of plant staff 
MAIER.J E Rochester Oas 8, Electric Corp B2/Q9/28 2|>p 
19S74 143 24X Fiche 50-244. B2/07/3B. 931 0010357 



g lri.li 



-6310010369 Proposed Tech Sp 
plant staff 

* Rochester a s t Electric Corp B2/09/38 
24X Fiche 5O-244, 82/09/28. 8210010357 



changes to permit reurgani i jti on of 
ilnp 19571 147 



9310040281 Forward t application to amend License DPH-19, rpvi i ing 
containment Isolation boundary requirements 
- ~ Rocheitr Gas & Electric Corp B3/09/2B 



HA1EH, J 

Office of Nuclear Reactor Regulatu 

FUh* 50-244, e3/O?/28, B21004O2a I 



Direc tor 



lp 



DEW TOW, H II 
15507 IfiV 24K 



8210040384 Application to amend License DPR-10, rei s ing c out* i 
Isolation boundary table 

MAIER.J E Rochester 0-as d Electric Corp 82/O9/3B 4pp 
155B7 17O S4X FlcKe SO-244, S2/07/2B, 821 OO4O3BI 



-B2 1 0070076 Submits dailij highlight re B203O1 meeting u/util 1 SE0302 
meeting u/W tit ing house in Qethesda.rlD to discuss recovery 
ictlvitiei at Facility L generic fteam generator tube 
degradation i respective lij 

tVONBjJ E Operating R eaetorl Branch S 89/02/26 DENTON. H . 
CARTER. J i EI5ENHUT.O MRC - Ha Detailed Affiliation Given lp 
IS64S 098 34X Fiche 50-MO, 62/09/10, S210070QQ7 

-8210070030 Sutimlti datlij highlight re B3O301 meeting u/util re propnted 
rtcavtry program for facility NRC concurred u/ proposal to 
remove small number of steam generator tube sections for 
metal lurglcal eiam 

LYQNSiJ E Operating Reactor* Branch S B3/03/04 DENTON . H . 
CARTER, J , EISENHUTiD MRC - Ha Detailed Affiliation Given lp 
1S645 077 24X Fiche 50-000,63/09/10,8210070007 

-6210070033 Submit! daily .highlight re util completion of cutting 3-inch 
hole In ittam generator B an 62030 B Burst tube & tube* 
fi44C54,R43C5'l & R43CS6 Temovsd for metal 1 iirglcal Eiam 
Meeting tentatively scheduled for 930332 

LYONS.J, E Operating Fleaceon Branch 3 B2/03/IO DENTON , H , 
CARTER, J . EISENHLfT.D MRC - Ha Detailed Affiliation Given lp 
15M5 100 24X Fiche 50-000, 62/09/10^21 0070007 

-82(0070087 Buomita dally highlight re 830323 meeting w/utii t 
Wt it Inotious concerning status of proposed repair 
activltiei Tuentij-f our tubts removed from stean generator B 
Foreign abject found in Unfj* Area 4 

CVONBjJ E Operating fieactor* Branch 5 83/04/03 DEHTON. H , 
CARTER, J , EISENHUT.D NRC - No Detailed Affiliation Oivn Hpp 
IS645 1O1 24X Fiche 30-000,63/08/10.6310070007 

-6210O700W Submits daily highlight r nitart of facility, Plant 
eipdcted to be ready for operation! above 5/1 power upon 
compl*tian of itartup pnyilci tistlng on 820335 
LYONSj J E Operating Rtaitort Branch 3 B3/0&/25 DEN TON , H , 
CARTER, J , EISENHUT.D NRC - No Detailed Affiliation Olvan lp 
1S648 1O3 24X Flctte SO-OOO, 63/03/10,821 00700O7 

-8310070131 Foruardi prHminjcij eitimate of Uak rate vi tim* during 
Ulnn* 20125 *tea<n ganei-ator tube rupture event S. plot 
ihowing Imp ortatit parameters ti ita-tut of sys 

IPPQLITO.T A OperatliiD Reactors Aiseisnent Branch 83/03/05 
ROE. J. NRC - No Detailed Affiliation Oiven 3pp 15i45 12( 34X 
Ficne 50-000, 32/09/10,8210070007 

-B210070135 Btvil rept tnout r. Olnna 820135 team tenirabar tube 
rupture svent HRC lith monthly tatui rep t ID Congrnn ra 
TH1-1 reitaTt end 

* NRC - Ho Detailed Affiliation ffivtn 82/03/11 3np 
136 12B, 24X Flthe 80-000, Ba/OS/10rB21 00700O7 

-8210070165 Devil rp I Input re remov* I of telectfd tube samplta throujh 
two acceii ferti drilled In tide of itesm generator to 
otitiin niBtallur-gical data for evalwation of it* am generator 
B tube failure; mecjianiim 

* NfiC - No DetaiUd Affiliation Oivin aa/04/OB a pp 
1564S 136 S4K Fiehr 30-OOO, 02/08/10,631 0070007 



B2100402B8 Proposed change to Tech Spec Page 3 h-h i 
iSiOlation boundary table Safety evaluation enc 1 
Rochester Ga.i 6 Electric Corp 82/09/28 3pp 
Flcne 50-344, 83/09/3B, B3100402BI 



c on tai nnent 
159B7 171 JM* 



B21DOS0214 Notifies that except for occasional transient specici>iD 
federally listed or (iropased threatened or endangered 
Iptciei eint in project impact area, in response to B3O902 
request Federal list of endangered ipeclea end 

HAMILTDM.P P I n ter lor, Dept oP, Fish 4r Wildlife Service US/O 4 ?/.^ 
CnUTCHFIELD. D Operating Reactors Branch 5 3pp 15611 357 it'll 
FUhe SO-244, 0a/0?/2B, B2IO05031 4 

B210050059 Approves B00220 request for withholding info re uie of Allied 
onife -fuel assemblies for Cycle 10 from public disclosure 
<ref 10CFH3 790) 

CRUTCHFIELD.D Operating Reactori Branch S B2/09/29 
WIESErlANN, R A Ueit inghouse Electric Corp 3pp 1503 171 ^4* 
Fiche 50-344,82/07/29,8210050059 

B210I3032& Comments on proposed scope of Phase III of SEP at reflected 
in individual topic definitions appended to 930909 1 tr 
Staff encouraged to develop L implement means to incorporate 
poiltlve attributes of Phase III in licensee/NRC Interface 
MCICH.R M SEP Owners Croup B2/1O/07 EISENHUT.D Division of 
Licenslngi 7pp 15A93 179 24X Flche 3O-000, 82/10/07, B210iaOJi?6 

B210130074 Foru/ards 920917 response to ACRS comments b recoirnnunildtiHars 
per facility SEP review 

CRUTCHFIELD, D Qperating Reactor* Branch 5 Q2/1O/07 MftlEO.JE 
Roc h niter Oai b Electric Corp Spy I 371 9 347 24X 
Fiche 80-244, S2/1Q/07,H2101B0074 

6210160033 Reipondt to ACRS B20818 comment! & recommendation! rs 
ficllltij SEP rfrVieui Draft NUREG-09E1 ui 1 1 be reviled to- 
reflect agree;me<nti 

D EN TO Mi H R Office of Nuclear Reactor Regulation, Director 
B2/09/17 6HEWMON.P B ACRB - Advisory Committee on Reactor 
Safeguard? 2fp 13719 349 24X Fiche 30-244, B3/1O/O7, 
3310180074 

B2IO190083 Forward i Amend 54 to LUensi DPR-1B. laf ety evaluation t 
notice of Issuance & availability Amend approvei provisions 
upilatinih containment isolation valve in Table 3 6-1. to 
reflect plant lua mod 

CRUTCHFfELD.D Operating Reactors Branch 3 82/10/07 MAIEft, J E 
Rochtltsr Oat & Electric Corp Sff 15719 294 24X 
Fiehe 50-244,82/10/0-7,6210180062 

821O1600B7 Amend 34 to License DPR-18. appro ving provision* upJating 
containmeTit Isolation valve In Table 3 6-1, to reflect plant 
iu.i mod 

CRUTCHFIELD, D Operating Reactors Branch S 62/10/07 lp 
19717 S76 24X Flcht. 90-244, 8S/10/07, BB1 01B0082 

321O1S0090 Stfet(j evaluation supporting Amend 94 to LUenie DPR- IB 
* Offic* of Muclear Reactor Regulation! Director 82/10/07 3p 
15717' 300 24X Flche SO-244. B2/10/07. B2101800B2 



DOCKETED ITEMS 



33 



--S210180094 Notice of issuance t. availability of Amend 54 to Lie 
DPR-1H 

CRUrCHMEt-D,D Operating Reac tors Branch 5 B2/IO/07 2p p 
15717 303 24X Fiche 50-244, B2/10/07. B2I 01SOOB2 



B2JOiaOU2 Forwards 631004 FR not ire. announc i no ACRS Subcommittee nn 
Eitrotne Eiternal Phenomena B21Q01 & 33 men ting? in Santa 
Manic at CA ta discuss Flooding k seismic hazards 

CflUTCHFIELD, D Operating Reactors Branch 5 62/1O/O7 tlAIEFl. J E 
Rochester Oas t, Electric Corp 3pp 15719 332 24X 
Fiche 50-244. B2/10/07, B210IB01 12 

8210190149 Forwards Amend 55 to License DPR-1 Bi safety evaluation J. 
notice of issuance d availability Amend incorporates neu 
License Condition 2 CUO) to confirm that neit steam 
generator insp uill be performed during refueling outage 
CRUTCHFIELD. D Operating Reactors Branch 5 S2/1O/OB MAIER, J E 
Jioch*str Cas t, Electric Corp 2pp 15719 1O5 24X 
Fichu- 50-341. 83/10/08,8310180149 



-S2IO1G0153 Amend 55 ti 
Condition 2 CUO) tc 
Involving c ddy cum 
6 performed during 



License DPH-10i incorporat ing neu License 
confirm that tie it steam generator insp 

nt Ic visual insps I. mater lancing mill 

refueling outage 



CJIUTCHFIELD.D Operati ng Reac tors Branch 5 B2/IO/00 2pp 
IS719 107 24X Fiche 50-244. 02/1Q/OB, 6210180149 



--821007O172 Foruaids info re stc 
operating PIJHs.pcr 750320 1 I 
including defect indications 
plugged uill not be provided 
GOLLER.K H Division of Reai 
75/O3/24 tIACCAflV, R fi Dlvi 



only) Spp 



15645 196 



am generator integiitg ', insps at 
1 requests Details of insps. 
tube plugging ciileria >t tubes 
eicept for Point Beach 1 
toi Licensing (NHR-I97D on lijl 
sion of technical Flcvieu (NRR-15'2 
Fiche 50-000. !3/OB/ 10. H210070O07 



B208190233 IE Info Notice 8-3b, Sup p 1 1, 
Implant Seeds " Svc liat o-ncl 

COBB.L 1 Division of Fu&l FarilitiBs. Mutenal 
82/10/06 Consolidated Edison Co of Neu Yot 1 

24X Fiche 30-000.92/10/06 H30Q1 90231 



king ", umlodgud 1-125 
afeguards 



8210130439 
visual in 



Hunt in 



:ti\ 



>ddi; 



inlet probab I u caused bi| 
pi es*ur i lation f i am prim 
I1AIGR.JE Rochester lia 
Operating Reactors Eran 



lube in U-stearo gene 



lot up 1 1 c 5 , 



Fiche 50-244. O2/ 1O/06, B2I O I, 10419 



educti 
ry side through leaking plug 

t Electric Corp 02/10/06 
H 5 Ipp 1 5602 OH) 24X 



cHUrLHFiri.l). U 



B21O210201 Foruiardi IE Insp Rppt 5Q~244/B<>-16 on f);i()Q30 0903 No 
none oiup liance noted 
MARTIN.T T Division of Engineering t- Technical Programs 

MAIER, J E nocheatar Gas fr electric Corp ^pp ISM/, 34b 
Fiche SO-244, 82/1O/06., Q2I O210201 



S2I01B0153 Safety evaluation supporting Amend 35 to License DPR-lfl 

< Office of Nuclear Reactor Regulation, Director 02/10/08 3pp 
15719 109 24X Fiche 50-244. 83/10/08, 82 1OIB01 49 



--3210180161 Notice of i S3 nan 
DPR-1S 

CRUTCHFIELB.D Operating Reactors Dranch 3 82/10/08 
1571"? 113 24X Fiche 50-24-1, B3/IO/QH, B2I OIG0149 



t aval 1 ab 1 1 1 tij of Amend 55 to License 
2pP 



--Q210210213 IE Insp Dept 5(1-244/03-16 nn (W0030 0903 Ni 
noted Major areas inspected falloiiiup on previously 

changes & mods ^ mod & cTesign program 

BLUMQERG.N . uISSEIT.P , CAPHTOH, I Division of Project 1 

Resident Programs B2/1O/Q3 9pp 15766 147 34X 

Fiche 50-244,02/10/06.8210210301 



B21OiaOkBl Clarifies 020903 request for addl info re NUREO-0737, Item 
II & 3. "Poat-Accidont Sampling Sys " Clarification section 
of U20902 Itr provides staff gu i del ines. not requirements 
on muetlno NUfiEC-0737 criteria 

CRIUCHFIELD.D Operating Reactors Branch 5 B2/10/Oa MAIEI.J E 
RochBBtBr Oas (. Electric Corp 3pp 15719 115 34X 
Fiche 30-244, B2/10/OB. S21O1B01Q I 

R21022O105 Advims that revieu of util 910901 respansa to NUIIEQ-07T/, 
Itum III D 3 4, "Control Room Hab 1 tab i 1 1 tiji " camptetud Issuo 
satisfactorily resolved etcept for single failure criterion 
of intake tt r!iauat ductuork 

CnUTCHPTELD, D Operating Reactors Branch 5 FJ2/1O/1E3 MAIEU. J E 
.Rochester Oaa J< Electric Corp 2pp 15775 100 24X 
Fichn Sft-241! 82/10/13.8210220105 

0207140037 Informs that info submitted by licensee in rosponse to 
mjREC-0737. Item III D 3 4, "Control Room Hab i tab i I i fry" 
accBp tab le 

HUHPHV, D W BattolU Memorial Institute, Pacific Northuiost 
FIN B-2333 B2/03/S3 HULMAN, L Accidont 

2pp 15773 102 24X Ficho 50-244, 82/1 0/1B, 



Laboratory 
Evaluation Branch 
9210220105 



D2 1 025027 5 Forwards status rept re unresolved safety issues, par NRC 

B20iI7 reojuest Info includes description of problem based 
an NRC (facurnentatlon 

KAIER, J E Rochester Oas !< Electric Corp Q2/IO/19 CRUTCHTIELD, D 

Operating Reactors Branch 5 47pp 15791 049 24X 
Fiche SO-344, B2/10/19, B210250275 

Irtipeetian roportui IE Bulletins b correspondence 

6210-070007 Raspondi to FQIA request for eight categories of TBCOTOB re 
strain generator! b Htoam turbines App A documents provided 
in a Uilll FOIA Heo.uest Bl-313 Forwards documents listed in 
App B 

F ELTON. J M nivision of Rules and Records 82/08/10 LONG, D J 
Wlnthrop. Stimson, Putnam t< Roberta 9pp 15i45 063 24X 
Flcho 30-000.82/00/10,83(0070007 

3210070033 Submit* dally highlight re May 19B1 Insp of ruptured tube in 

Qlnni ste<m generator Failed tube located in uadge ataa of 
itaam generator 

UVONS, J E Operating Reactors Branch S sa/OS/04 DENTON.H , 
CAHTH,J., EIBENHUTiD NRC - No Detailed Affiliation Given lp 
[5643 090 24X Fich 50-MQ, BS/OS/10, BSI 0070007 

0210070139 Forward! tabulated data on steam generator insp t mainl at 

facilities Data should be provided to licensees 
IPPOLTTO. T Operating Reactors Assessment Branch B2/04/01 
VARCJA, S Operating Reactors Branch 1 Spp 1SA43 131 34X 
Fiche SO-OOO, 82/oa/lO, 8210070007 



B2101905BO Ack receipt of E120024 Itr inpormi.ig NR1 of s 
correct violationo noti'd in 1C Insp Flspt 10-244/01-22 
ALLAN. JM Region 1. Office of Director (12/10/07 
Rochester Oas !, Electric Coi p lp 15739 107 24X 
Fiche 50-244, B2/10/07. B2I 0190500 



--B210190S9I Responds to NSC Bl 1215 Itr re violations noted I r> It 
Ropt 50-244 /B1-2J Conectivo actions emergency plan training 
program ui 1 1 be realigned by 030115 to be consistent ui/ 
functional area requirements 

I1AIER.J E Rochester Oas k Elertric Corp t!2/OJ/2rt IIAYNE'i. 
Region 1. Office of Director -Jpp 1573V "301] 24X 
Fiche 50-S4 4, B2/ 10/07.0310190500 



~fl2l019061B fleiponds to NilC Bl 121-i Itr re violations noted in 3L Imp 
Rept 50-244/ai-22 Correc t Ivo aclions clarified required 
action, eliminated eiisting ambiguities, incunei stenc ma t> 
error* for emargsncy functions 

MAIEFI.J E Hoche6*-Dr Gas t. Electric Corp 0a/04/|? Hrt^HES.t! < 
Region 1. Office of Dlrectoi 2pp 137,19 )!.' Mil. 
Fiche 5Q~244 1 82/10/07,B210I'70'iBO 

9310190637 Responus to NRC 820530 llr re violatinns noted in II luip 
Kept 50-214/01-22 Corrective actions committal' established 
to evaluate & inventory supplies Repl uiill be submitted 
by 821231 

MAIER, J E Rochester Qas '< Electric Corp 0.2/06/30 &HITM.O M 
Division of Emergency Propaiedness L Operational Support ^-!pp 
15739 314 24X Fiche SO-24'1. 92/10/0/, B21 OI905BO 

0310190647 Responds to NRC B112IS Itr re violations noted in IL Intp 
flept 50-244/01-22 Correc t ive actions revision of Emergency 
Plan SC-I completed prior to startup after 19B2 refueling 
shutdown 

MAIER.J E Rochester Gas !, Electric Corp Q2/10/07 HAVNCS, R C 
Region 1, Office of Director lp 15739 33i 24X 
FichB 50-244,82/10/07, B210I90500 

8210180149 Forwards Amend 53 to Lic&nse DPfl-18. safety evaluation b 
notice of issuance >j availability Amend incorporates iieu 
License Condition 2 CUO) to confirm that unit steam 
generator insp mill bo pot-formed during refueling outage 
CRUTCHFIELD, 1) Operating Reactors Branch 5 02/10/03 MAIEH, J k 
Rochester Gas (, Elaetric Corp 2pp 15719 105 34X 
Fiche 30-244, H3/10/OB, 0310180149 

--8210180153 Amend 55 to License DPR-1 B, incorporatino neu License 
Condition 2 C<10) to confirm that next steam generator insp 
Involving eddy currant b visual insps & mater lancing uill 
be performed during refueling outage 

CRUTCHFIELD, D Operating Reactors Branch 5 B3/10/OB 2pj> 
13719 107 24X Fiche 30-H44, 83/10/08, 821 0180149 

B21Q1H013B Safety evaluation supporting Amend 55 to License DPR-1B 
* Office of Nuclear Reactor Regulation, Director B2/10/08 3pp 
13719 109 34X Fiche 30-B44. B2/10/00I 82 101B0149 



34 



DOCKETED ITEMS 



liability of Amend 55 to Licenss 



DPR- IB 

CRUrCHFIELD.D Ooe 
13719 192 24X Fic- 



tino Reactors Branch 3 83/10/09 
50-24-J, B2/1O/Q6-. B31Q1B0149 



2pp 



821022034'; Ark receipt o> B20915 i' 1005 Itfs informing NRC of steps 
taken to correct violations noted 1 in IE Insp Kept 
5.0-2-) 4/32-] 4 

STARDSTECK1.J) Division of Project 6 Resident Programs B2/IO/13 
MAJER, J E Winchester Qas I, ESectric Corp Ip 15777 355 24X 
Fichs 50-214, S2/10/I3. 9210330344 

--8210220352 Responds to NBC B20816 Ifcr re violations noted in IE Insp 
Rep* 5Q-244/B2-14 Corrective actioni all four 480-volt 
safeguard buses tested & draft test procedure issued to 
affi.it? engineering dopt far review 
MAIER'J E Rochester Gas '. Electric Corp 82/09/15 DRUMMER. E J 

Region I, Office of Director 3pp 15777 356 34X 
Fiche 50-344, B2/10/-13.8210220344 

9210220360 Responds to NRC BSQGli Itr re violations noted In It Insp 
Rept 50^244/82-14 Correttive a-ctiotis all Four 480-vo 1 t 

cffsite engineering dept for revipu 

MATER. J E Rochester Gas I Electric Corp B2/10/05 QRUNNER, E J 

Region I, Office of Director 2pp 13777 35D 2-JX 
Ficne 50-244, 92/10/13. 0210230344 



2QB 1 9O230 TE Oulletin 32-O3, "Stress Corrosion Cracking In Thi 
Wal 1. Large-Diameter. Stainless SteeL H ec ircu lation Sys 
Piping at DWR Plant! " Svc list enc I 

DEYBUNG.R C Director's Office. Office of Inspection and 
Enforcement 82/10M4 Coriiol idat ed Edison Co of Neu Vor k 

115pp 15B1O 123 34X Ficne 50-000.85/10/14,8200190239 



B2101907O3 LER S2-022/01T on BSlOOl.on* tube of A steam generatoT inltt 
found u/crevice intergrenular attack indication above 
plugging limit steam generator inlet had 28 tubes above 
plug-Ding limit 6 3 Hi/stress corrosion Rept follows 
SI.'QUt B A Rochester Gas & Electric Corp B2/10/Q4 HAYMES, ft C 
Region 1, Office of Director Ip 19736 154 24X 
FlchB 50-344, B2/1O/04,S21Q1 1 70703 



8210250334 Forwards LEFi B2-022/OIT-0 

MAIER.J E Rochester Oas i Electric Corp B2/10/15 
Region J, Office of Director Ip 1 579O 001 24X 
Flcn& 5O-244, B2/10/13, B21O250334 



8210250343 LER 62-022/011-0 on BSIOOl.eddu. current eiam of tlean 
generator A Inlet indicated one tube u/erevicc in tergranolar 
attack indication above plugging criteria tc 32 tubes an 
steam generator B u/ind 1 cations All 33 tubes plugged 
BODINE.J C Rochester Gas & Electric Corp 02/10/15 ItcQlDn 

Office of Director 2pp 13790 002 24X Flthe 90-344,1)3/10/19. 
8310350334 



DOCKET &0-24S MILLSTONE NUCLEAR POUER STATIDfJ, UNIT 1 
F Security, medicali emergency (. fire protection plans 



8210040120 Discusses util compliance ui/SEP Topic VIII-3 0, "DC Pn 
Siji But Voltage Monitoring & Annunciation "Sufficient 
monitoring equipment provided in control room or locallij to 
alert operators of dc sijs trouble No mods needed 
CDUM5I4..H G Northeast Nuclear Energy Co (subs of Northent 
Utilitlesl COUfJSIL.H G Northeast Utilities 82/09/23 
CKUTCBFIELD, D Operating Reactors Branch S 3pp 15591 204 
Flche 50-245,03/09/23,3210040120 



Forwards IE Imp Rept SO-244/82-1Q 
noncomp liance noted 

STAR05TECKI.R Division of Project 
KAlEfi.J E Rochester G*s i EUctn 
Fiche 50-244, 02/10X14, S31O290I7I 



020901-093O No 



Beslilent Programs 
Corp 2pp 15953 



B210210182 Forwards IE Insp flept) 50-345/82-17 (. 50-334/BS-I9 on 
B2 080 0-0925 No nnncompl iance noted 

STAHOSTECK1.R Division of Project t Resident Programi Viif 10/0/ 
COL/WSIL.U Northeast Nuclear Energy Co (subs of Northlt 
UUIitifs) 2pp IS766 041 24X Fiche 50-245, S2/10/07, SS10BIOIDJ 



-8210290173 IE Insp flept 5O-244/82-I8 on fl309Ol-0930 No noncompl lati 
noted Major areas inspected plant operati ons, survei 1 lane fl 
te-s 1 1 ng> LERs, 1 1 censed ' nonl i censed employee- training 
programs I, follouiuo ot TMI lessons leained implementation 

z innEisrwjpf? p , BAUNACK,WH . KISIER.HQ Division OP project t 

Reiiilent Programs 83/10/13 llpp I5B53 290 24X 
Ficjie 50-244.Ba/10/14.9310290l7 



B2102IOI96 IE Imp Repts 50-24S''B2-I7 fc 50-336/02-19 on SSOllOU-OWB *. 
noncompliance noted l-fajop areas inspected plant ti refueling 
op era 1 1 onii equipment alignments b read iness. rad iatlon 
protection ti physical security 

SHEDLOSKV. J T , LIPINBKI.Dfi . ELASSER. T C Division ot Pra/rct I 
Resident Programs 02/1O/05 ISpp 18766 043 24X 
Fiche 50-245. 82/10/07, H2102I01B3 



2102'?0212 AcV receipt of 821015 llr informing 1IRC of steps taken tn 
correct violations noted in IE Inspfjcpt 50-344/B2-15 
SrAROBTECKI.R Division of Project t Hetident Program! B2/IO/25 
rtAIER.J E Rochester Oa i J, Electric Corp Iji 13853 27*} 24X 
Fiche 50-214,03/10/25,0310270212 

-8210290217 Rc-iponds to IJRC 830914 Itr re violations noted in It Insp 
Bept 50-244/02-15 Corrective actions lituation reviouetf 
! determined to be isolated case Further action unnecessary 
MftlER. J E Rochester Cas fc Eloctric Corp B2/IO/15 EJBUMNER.E J 

Region 1, Office nF Director 2pp 15B93 2BO 24X 
Fiche 50-244, B2/IO/25, B2I029O212 



P Operatinj license stage documents tt correspondence 



8310010312 Rea.uts that processino of S2OB1S license amend ppl 
b postponed Revised application changing radiological 
effluant Tech Specs mill be docUted on or about 021113 for 
both facilltir* 

COUNaiL.M Connecticut YanfceB Atomic Pouter Co CClUNBILp H 
Northeast Nuclear Energy Co dubs of Northeast Utilltlnil 
COUNBIL.H Northeast Utilities 02/09/22 CLASH, H A Optr 
Reactor* Branch 3 CRUTCHFIELD. D Operating Reacton Brunch B 
3pp 1S&74 047 24X Fiche 3O-000, B3/09/22, 9210010312 



B2100S01IB Forwards summary of differences For SEP topics b diKrl 
of (ntendirf actions Schedule provided for topics, requiring 
addl Info Topics will o addressed in detail in topic- 
ipec 1 f ic correiipondeno 

COUN8IL.U Northeast Nuclear Energy Co (subs of Northeast 
Utilities) COUN9IL.U Northeast Utilities S2/09/2S, 
CRUTCHFIELD, D Operating Reactors Branch 3 40pp 1 5i04 IBS 
Flche 5O-34S, B2/09/33, 82100501 IS 

B21001O320 Summarij of BH0915 meeting u/util In Bethesda, MD- rl fDil 
Cdmbvt Ib le g*s control evaluation - fuel/clad gap iodln* 
release, vs uater rjdiolijsts rat's Calculati onal methoddlagv 
pruented in util 6 20 BOA submittal acceptable 

SHEA. J J Operating Reactors Branch 5 B2/09/23 Qpr*Un) 

Fcaactors Branch 3 6pp 15974 040 24X Fiche 30-249,02/09/33. 
Q210O103SO 



0210050177 Comments on NRC evaluation of SEP Topic V1II-2, "Emirgtnii 
Ortsite Power Sv* " Protective trips of gas turbine 
interlocki sihould -be bypassed under accident condition* 
unless bypassing trip would result In machine destruction 
COUNSIL.U NortJiBjst NucUar Energy Co dub* of rJortheait 
Util itiBs) COUMBIL, W O Northeast Utilities 88/09/27 
CHUTCHFIELD, D Operating Reactors Branch 5 4pp 1 3603 330 3*1 
FicK" 30-B45, aa/09/a7i8aiOOSO177 



8210040233 Inform that SEP Topic V-6, "Reactor Vassel InUgritv." 
mtiti current criterl* Evaluation mill be basic input to 
integrated safety assessment for facility, 

SHEA, J Operating FJactor> Branch 3 BS/09/S9 COUNSIL.H 
Northeast Nuclear Energg Co (subs of Northnast Utilitltl) Sip 
159B1 360 24X Fitbe. SO-24S, B2/09/29i aai0040233. 



DOCKETED ITEMS 



35 



e310Q40S'3 Informs that licensee response to Item (a) of NRC 83062B 1 tr 
rr SEC Topic iII-5 D, 'Pipe Break Outside Containment," 
acceptable NRC draft evaluation factually correct Si 
considered final NRC evaluation of topic 

StIEA.J Operating Reactors Branch 5 83/09/39 CQUNSIL.W 
Northeast Nuclear Energy Co (subs of Northeast Utilities) 3pp 
15537 135 24X Fiche 50-245, B2/09/29, 8210040293 



SH10Q6aO<ia Comments on HRC 



aJuation of SEP Topic 1II-4 D, "Tur 

provide assurance that turbine missiles not safety concern 
COUNSIL.U Northeast Nuclear Energy Co (subs of Northeast 
Utilities! CQUN5IL.WG Northeast Utilities 82/09/29 
CflUTCHF IELD, D Operatsng Heactois Branch 5 2pp 15614 332 
Fiche 50-245, 02/09/29, B210Q6004B 

6210060094 Responds to open items identified in 820630 safety 
evaluations for 6EP Topics IEI-6, "Seismic Design 
Considerations" & IM-11, "Component Integrity " Corrections 
4 status of IE Bulletin 79-14 program mods cncl 

COUNS rL . U Northeast Nuclear Energy Co (subs of Northeasl 
Utilities! CQUNSIL.H Northeast Utilities B3/Q9/29 
CRUrCHFIELD. D Operating Reactors Branch 5 9pp 156(5 O13 
Fiche 30-245. 62/09/2?, B2I 0060094 



24 X 



5210390-105 He-spanils to request for estimate of amount of Iodine 
released to coolant following LOCA Total earn inventory of 
iodine, botti staile ft radioactive i sotopes. a pproi 10 tg. 
uj/var i a t 1 an depending an fuel burnup 

HULMAN.L G Attident Evaluation Branch B2/O9/29 CRUTCHFI ELD, D 
Operating Reactors Branch 3 3pP I S063 307 24X 
Fiche 5O-245, 33/09/29. B21O290403 

fi21OI503B2 Advises that gas turbine generator bldg can adequately 
resist design basis tornado load i ngs, per SEP Topic III-2 re 
'.und 6 tornado loadings Technical evaluation rapt t- final 
SEW enc 1 

ShTA,J Operating Reactors Branch 5 03/09/30 COUNSIL, WO 
Northeast Nuclear Energy Co (subs of Northeast Utilities) 9pp 
35710 241 24X Fiche 50-345. B3/O9/3O. B2JOI 503G2 

92-06530020 'Wind ti Tornado Loadings," technical evaluation rept 
BARRETT, D J , AOARWAL.H Franklin Institute/Franklin Research 
Center NRC-O3-79-1 IB TED-C5257-403 82/06/21 PERSINKQ, D 
r.RC - No Detailed Affiliation Given ISOpp 15710 2S4 24X 
Fiche 50-2-45, 02/09/30,9210150332 

0210130331 Discusses revision of admin i strati ve procedures to 
incorporate revised working hour guidelines fc provisions 
for authorizing deviations per B2020B i- 041 3 requests, TMI 
It-em I A 1 3. "Shift Manning" (. Generic Utr B2-I2 

COUNSIL W G , CrtONETTA J P Northeast Nuclear Energy Co (subs op 
Northeast Utilities! COUNSIL. W O Connecticut Vankee Atomic Power 
Co B2/1O/OI EISENHUT. D G Division of Licensing 3pp 

15679 127 24X Fiche 30-000,92/10/01,6210130331 

S21O130O93 Forwards request for addl info re containment purge & vent 
operabllity (H-24) necessary to complete revleui 

CFIUTCHFICLD. D Operating Reactors Branch 5 B2/10/OS COUNSIL, U G 
Northeast Nuclear Energy Co (subs of Northeast Utilities) 4pp 
15673 115 21X Fiche 30-345, 02/10/03. B2101 30093 

B31O130326 Comments on proposed scope of Phase III of SEP as reflected 
in indtvidual topic definitions appended to 020909 1 tr 
Staff encouraged to develop J. implement means to incorporate 
positive attributes of Phase III in licensee/NRC interface 
KACICH.H rl SEP Ouners Group 62/10/07 EISENHUT, D Division of 
Licensing 7pp 15693 179 34X Fiche 9Q-OOO, 02/10/07, 83101 30326 

82I02S04B6 Forward* Final evaluation of SEP Topic VI-fl. "Containment 
Isolation Sy-s >' Deviations from review guidelines listed 
Implementation of administrative conlrols on valves 
recommended 

SHEfc.J *1 Operating Reactors Branch 5 B2/IO/OB CDUNBIL. W 
Northeast Nuclaar Energy Co (subs of Northeast Utilities) 34pp 
15779 03t 24X Fiche 50-345: B2/IO/OB, 8210320486 

9210270200 Forward* summary of NRC positions on 26 unresolved safety 
is-suts. tons! t ti ng of eicerpti from NRC publication* t, repti 
to Congress fc assessment of generic applicability Adequate 
basis ciiati to warrant continued plant operation 
COUWSILiW . OPEKA. J F Connecticut Yankee Atomic Pouer Co 
CDUNSIL.M G Uortheast Nuclear Energy Co (subs of Northeast 
Utilities) 82/10/13 CRUTCHFIELD.D Operating Reactors Branth 5 
5Hpp 15921 354 24X Fiche 50-000. 02/10/1 3, B21027O200 

a2102AOI94 Discuss" utik review of rod control circuitry No credible 
single -failure could coule inadvertent movement of more than 
on* control rod at time Info should resolve concerns r 
SEP Topic 1V-3, "Reactivity Control Sys " 

CDUNBIL. W G Northeast NucUar Energy Co (sobs o# Northeast 
Utilities) COUNSIL, U G Northeast Utilities 82/10/14 
CRUTCMFIEU), D Operating Reactor* Branch 5 2pp 13799 019 24X 
Fiche 50-245. B2/10/14 9210360194 



921O2&0414 Provides addl info re 2-phase degraded grid unoervDltage 
protection scheme for Class IE pouier sy< in response to 
820623 renuest Mods uill be deferred until 1994 refueling 
outage Next rept uill be submitted during Jul 1983 
CQUNSIL.W Northeast Nuclear Energy Co (subs of Northeast 
Utilities) COUNSIL.W G , QPEKA, J F Northeast Utilities 
82V10/I4 CRUTCHFIELD.D Operating Reactors Branch 5 6pp 
13B06 H4 24X Fiche 50-245,83/10/14.9310260414 

931O250134 Forwards draft Integrated plant safety assessment rept Dr.ift 
provided for SEP Subcommittee 931026-27 meeting 
CRUTCHFIELD.D Operating Reactors Branch 5 82/1O/1S CQUNSIL.W O 

Northeast Nuclear Energy Co (sub* of Northeast Utilities) 79p(i 
157B? 1A4 24X Fiche 50-245, S2/10/ 15, 82102S0124 

B31O260519 Forwards proprietary "9TR Bundle Submi ttal, Mi 1 1 stone-1 
Segmented Test Rod Dundle,Suppl 6," as app to 921015 Reload 
B license amend submlttal Rept withheld Iref 10CFR2 790) 
CDUNSIL.W O . OPEKA.J F Nortneast Nuclear Energy Co (subs of 
Northeast Utilities) COUNSIL.W Q Northeast Utilities 83/10/19 
CRUTCHFIECD, D Operating Aeacton Branch 5 3pp 15305328 24X 
Fiche 50-243,82/10/15,521026051? 



luation of SEP Topic III-l, 
Syn, " in response 



8210260459 Forwards corrections to draft ev 
"Classification of Struc tures, Components 
to 820505 request 
COUN3!L,W 6 , BISHOP, R W Northeast Nuclear Energy Co (subs of 
Northeast Utilities) COUNSIL, W G Northeast Utilities 82/10/17 
CRUTCHFIELD.D Operating Heacton Branth 5 13pp 15H06 310 S4X 
Fiche 30-345. 02/10/19. S3I 0260459 

9210250319 Advises that SEP Topic Vl-6 "Containment Leal Testing," 
considered complete to conduct integrated assessment 
Multi-plant Item A-4 rev leu will be conducted independent of 
SEP 

SHEA.J Operating Realtors Branch 5 82/10/22 COUNCIL, W 
Northeast Nuclear Energy Co (subs of Northeast Utilities) lp 

1578B 34-) 2<1X Fiche 30-245, Q2/10/32, 821O330219 

Inspection reports, IE Bulletins ! correspondence 

8210060233 Advlsei that masonry uall mods uii 11 be complete by Nov 1982 
& const will be completed by June 1983, per IE Bulletin 
80-11 

COUN8IL, W C Northeast Nuclear Energy Co (subs at NortdSJSt 
Utilities) COUNSILiW Northeast Utilities U2/09/24 
HAyfJEB, R C Region 1, Office of Director 2pp 13620 DOS 24X 
Flche 30-243, 02/07/24,0210060333 

821015069? Foruards req.uest for addl info to complete review of SOllO-1 
response to IE Bulletin HO-11, "Masonry Hall Design " 
Response eipicted within 60 days of 1 tr receipt 

CLARK, R A Operating Reactors Branch 3 BS/O9/2S COUNSIL. M 
Connecticut Yankee Atomic Pouer Co COUNSIL, WG Northeast Nuclear 
Energy CD (subs of Northeast Utilities) 13pp 13716 IOO 24 X 
Fiche 30-000,93/09/29,9310150699 

82100600HB Comment* on NBC evaluation of SEP Topic III-4 B, "Turbine 
Kissilis " Current insp & testing schedule* adequate to 
provide assurance that turbine missiles not safety concern 
COUNSIL. U G Northeast Nuclear Energy CP (aubs of Northeast 
Utilities) CQUNSI1.,H Northeast Utilities 82/09/29 
CRUTCHFIELD.D Operating neactari Craned 5 2pp 1S614 332 34X 
Fiche 50-243i B2/09/2 1 ?, B210C-6004S 

8310070332 Ac k receipt of 820914 1 tr informing NRC of steps taken to 
correct violations noted In IE Insp Rept* 50-245/02-10 !< 
50-336/92-14 
MARTIN.T T Division of Engineering i Technical programs 82/10/05 

CQUNBILrM G Northeast Nuclear Energy Co dubs of North "flat 
Utilities) lp 13634 051 B4X Flche 30-343, B3/1O/03, 9210O703S2 

8310070356 Responds to MRC 820313 Itr re violation* noted In It Insp 
R*pts 50-243/B2-IO l> 30-336/93-14 Corrective actions 
controlled documents updated >/ Unit 1 control roan drawing 
deficiencies corrected 

COUNBIL.U G Northeast Nuclear Energy CD (subs of Northeast 
Utilities) COUNSIL, W Q Northeast Utilities 3/09/14 
MARTIN.r T Division of Engineering & Technical Programs 3pp 
IS634 033 24X Flche. 5O-345, 02/10/05, 0210070352 

82081*70233 IE Info Notico 80-35. Sup pi 1, "Leaking ft Dislodged 1-135 
Implant Seeds " Bvc list ncl 

COBBrL I Diviilon of Fuel Facilities. Materials & Safeguards 
82/10/06 Consolidated Edison Co, of New Vort 6&pp 13761 2SO 

24X Fich 30-000. S3/IO/06, B20BI90333 

9210210182 Forwards IE Imp Repti 50-243/B2-17 d 50~336/82~1? on 
B3080Q-0923 No noncompl iincn noted 

STAR03TECKI.R Division of Project tt Resident Programs 63/10/07 
COUNSIL, W G Norehiast Nuclear Energy Co (subs at Northeast 
Utilities) 3pp 15766 041, 34 X Fiche 30-345, 93/10/07, B31O31018S 



36 



DOCKETED ITEMS 



8210210(96 IE Insp Septs 50-2-15/82-17 i 30-336/02-1^ on B20BQB-O925 MD 
non compliance noted Hajar art at inspected plant ! refueling 
oper at ions, eqii 1 pment a I ijnmenti b riadlnessiradiation 
protection & physical security 

5HEDLOSKY, J T , L1PINSKE.D R , ELASSFB, T C Divliion of Project t. 
Resident Programs 62/IO/Q3 I5pp 15766 O43 24X 
Fiche 50-345,82/10/07,9310210183 



IE Bulletin B2-03, "Stress Corrosion Cracking in ThiEl- 
Wal I. Large-Diane ter. Stainless Steel. Fee ircu I ation Sy 
Piping. at BUB Plant* " Svc list end 

DEYQUMQ.R C Director's Office, Office nf Inspection and 
Enforcement B2/IO/14 Conjolidated Edison Co of New Vor I 

Il5pp 15910 1H5 24* Fiche 50-000,82/10/14,9209190236 

B2 10220479 Notification of 831039 meeting u/v 1 1 1 in Bethe Ida, MD to 
discuss spray sparger crack Indications detected during 
visual insp usina underwater television iquiptnent 

SHEA, J J Operating Reactors Branch 5 B2/10/21 CRUTCHF1ELD. D 
Operating React-on branch 5 3pp 15779 0-75 34X 
Fiche 50-345. 62/1O/31. S2102ZO479 

S Reportabte occurrences, LERi & related correspondence 

B21OQ1Q009 Responds to FGIA request tor 19 categories of documents re 
nuclear reactor events fi lafetig .problems Forwards Hocumentt 
1 1 sted I n App A 

FELTQN.J M Division of Rules Jnd Records B2/Qfi/2S UDELL, R A 
Critical Masi Energy Project !5pp 13727 005 94X 
Ficlie 30-OQO, sa/OA/aa, B210010008 



8103190719 Operating Reactor Event Memo Bl-29 re cpacking in several 

ASI1E Code Class 1 & Class 3 piping sy> Affected su. are 

isolation c ohdensori shu tdomh tool ing. cleanup d LP I 

subsystem Defective sections are under repair 

EISEIJHUT..D Division of Licensing SI/03/05 VdLUMEflifl 

Division of Engineering flpp 15738359 24X 

Fiche 50-000,82/06/23, B2100IOOOO 

931QOBQ015 Addk response to FOIA request for 19 categories of info ro 
nuclear reactor events ( safety problems Forwards documents 
lifted in App A Documents In App 8 eomp late lij withheld <ref 
FOIA Eiemp t Ion 5) 

FELTOU,J M Division of Rulm and Retards 83/07/12 UDELL, Fl A 
Critical Mass Energy Project 9pp 1 5663 O37 S4X 
Fiche 50-000, Ha/07/12, 92100SO01 5 

830607010;, Dperatinfl Reactor Event MB mo 83-01 re 010910 reactor scra 

u/uater banner evnt Study of Unresolved Safettj Issue A-l 
shoui'S no other water hammer event* In BHfl Isolation 
condens-ara 

EIBEN>llJTiD a Division of Licensing B2/03/35 VDLLflEfl, R H 
Division of Engineering HATTeON, R J Division a? a-ystems 
Integration (post 811005) HAHAUER , S H Division of Safety 
Tschnologu 7pp 156i3 ISO 24X Fiche 50-000,33/07/12, 
B210C3QOI5, 

6210070360 LER QS-01Q/OIP on e30?25,uhile p*rPormlng remote vitiml ttisp 
at core spray spargers, tract Indication identified on one 
core sprau sparger to junction toi urldi.Addl info ull 1 be 
pravi-dfd in 1 fl-daij follouutt rept 

MROCZKA, E J Northeast Nuctear Encrjy Co Cubs of Northeast 
Utilitieel HROCZKA- E d hfarthvast Utilities B2/09/a7 
HAVfJES.R C Region f. Office of director Ip 15634 059 BVt 
Ffche 30-24S, 02/09/27.0310070360 



B2102H)130 LR B3-01S/01T-0 on B3Q935, crac k indication itfentifltd ei 
one core spraij iparger to junction boi uifld Caused bij high 
itiel-d residual stresses Stress corrosion cracking iridij have 
initiated indication Sparger hold clamp will be installed 
Thin-L.T S Northeast Utilitim H3/10/12 Region I, llffLt* *l 

Director Ip 137A3 OB9 24X Fiche 30-345, B3/ IO/ 13, 



9310220103 Forward* LER 02-O21/03L -0 Defailed event analysis e 
rWOCZKA, E J Northeast Nuclear Cnergy Co (suhs of Northea 
Utilities) KROCIHA.EJ Northeast Uci 1 1 1 les 62/lOVin 
HAVNEa.R C Region 1, Office of Direttor 2pp 1577Q Iftf 
Fiche 50-2H5. B2/1O/13. 0210220103 



--B210S2010S LER 32-021/03L-0 on 030913. d less I generator Iri^H ^un 
operational readiness demonstration test Caused bij brolon 
nnj tijpe mire Iu9 at current transformer secondary 
connection due to FLeung during installation 

THJLL, T S Northeast Nuclear Energy Co (subs of Northonit 
Utilities) B5/10/13 Region 1. Office of Direr tor Ip 

I577B 171 aflX Fiche 50-245.62/10/13,8310230103 

821O22OII2 Faruards LER 62-020/011-0 Detailed event analgm ( m i 
KRQCZKA.E J , MRDCZKA. E J Northeast Nuclear Energy Co Hubs of 
Northeast Utilities* 82/10/15 HAYNES. R C Region 1, Uffic* of 
Director 3p p 1S778 164 24X Fiche 50-245. B3/ IO/1S. OSmJJi) | I . 

--B2102201I4. LER B5-020/01T-0 on 620930, four ITT Online] ) mulhlinrn 4i 
to fall uithin recormnended range Fui ther analysis shuupd 
that only one inubber Failed design acceptance range (.annul 
hi| oil (callage through cracked reservoir 

THULL,T B Northeast Nuclear Energy Co (subs nf riorlhujtl 
Utilities* B3/10/15 Region l< Office of Direcio, in 

S577fl 167 24X Fiche 50-249,92/10/15,0210220112 

6210220195 Foi-uardi LER 02-019/01T-0 Detailed event an,al 41 it tin l 
HnaCZKA.E J Northeast Nuclear Energy Co (subs of Morthe*t 
Utilities) MRdCZKrt. E J Northeast Utilities G2/ia/i<i 
H(VYNES,R C Region 1, Office nf Director 2pp 15/// ,/() ,'tt 
Fiche 50-245,92/10/15,8310320191 



-SS10220201 UER 32-Olfl/OlT-O on 920928, five safotij leliiif vd1v 
to ctpen at requlrfld setpolnt Cause being invest Iga tfi) bu W 
Two valves uilll be replaced or rebuilt Other three uill bo 
remarked t> retested 

THULL, T S Northeast Nuclear Energy Co (subs nf Unr irndi 
UtllUies) a2/IO-/15 Region I. Office of Dirtclor U 

13777 272 24X Fiche 50-245, 02/10/ 1 5- 0310930195 



DOCKET 5Q-S47 INDIAN POINT STATION, UNIT 2 

F Security, medical, emergency 1 fire protection plant 

B210Q-6.0149 Forwards "Testing t Repair af Blren Portion of Mrt N 
Not 1 f itat ion Sijs for Indian Point Nucloar Pamer Gonor.i 1 1 nj 
Plants" per tfjicusston at Q2090B status meeting 

KELLV.J J Poujftr Authority of the State of Neu Yorl Kiitfi'H l'> 
DAVIDDFF, B NSW Yorl, State of Ip 15611 E99 3<U 

Fiche 30-247, 92/09/15,6210060145 



~B-al00601il8 "Taatina & Repair of Slron Portion oF Alert b 
Bys fnr Indian Point Nuclear Pouer Generating Plani " 
i Pouer Authority of the State of Neu Vorfc Q3Jai/\4 
13&I4 396 24X Fiehe 50-247, B2/09/ IS, B2100i0145 



9210070-304 LER 32-019/01P on 830938, three safety, re! to* Valve* failed 
to open at required setpoint pressure during bench test 
Cause under invistigat i on Three remaining tafety relief 
valvii uill be removed tt bench tested. 

MROCIA.E J Moi-theast Nuclear Energy Co (subs of Northeait 
Utilities) UROCZKA.E J Moi-th&ast Utilities 82/09/29 
HAYHE8.R C fiegton lj OfflC of Direttor Ip 15634 245 24X 
FiClie 50-243, 82/09/29. 6310070304 

921O070250 TOetopu messioe of LER 82-020/OLP on 830930, ITT OHnnell 
snufcbers failetf loctup . bl*tl rafce renuirements Snubbers 
(uitl be m*ds operable a r replaced prior to reactor startup 
MRDCZKA, E J Mortlnist Hueltar Enerau Co Isubs of Mnrth*s t 
Utilities) MROCZHA.E J Morthest Utilities B2/JO/01 
HAVNESj R C Region I- Office of Director U 15634 287 21X 
Fiche- 50-243, 82/10/01,8310070380 

flai031t)4S3 Foruardl LER B2-01B/01T-0 D-t.iUd ivint analysis incl 
HROC2KA.E J Horthtait Nuclear Energy Co (subs of Northitist 
UtilitletJ. MfiaCIKA.E J Northeast Utilities 82/10/12 
HAYNEa.R C. Region Ir Offit. af Director, 2flp IS7i3 OB7, 24X 
Fiche 50-B4B, B2/ 10/12- BBIOEI0423 



S2102BOHa Releases public Version of revised emergoncg plan 
imp lemintliig prociduroi 

F ELTON, J M Division of Rules and Records 62/10/12 Dncu 

Manajement Branch Ip 1 5Bi3 271 24X Fiche M>-Q(KJ, (\U/ |(>/ 1 j 
6210260145 



82I02S0154 FoTuardi public vertlon of revisions to Emergen<v J' 
Implementln-j Procedures IP-1020 re airborne radioiodtn* 
determination t, IP-1046 re util personnel respDiis Ibl li t lit 
during Unit 3 emergencies 

O'TOOLEjJ D Consolidated Edison Co of New York SJa/lO/O! 
HAVNEB.R C Region I, Office of D( rac tor 3pp I9DA3 tf'J 
Ficha SO-OO3, B2/10/I2.B2102SOHB 



621028013? Public version of ^.visions to Emergency Plan Inp] 
Procedures IP-l&ao re airborne radiotodine datermlna t Ion i 

IP-10"IA re util personnel rtsponsib 1 1 itins duri"B Unit 3 

intergenc; ins 

Cotnolitfated Edison Co of Neu York 92/09/01 ll,tp 

1&962 275 SIX Fiche 50-003,62/10/12,0210200149 



DOCKETED ITEMS 



37 



Advises that serious deficiencies in emergency preparedness 
will not, be corrected since State of lit 4r FEMA not 
addressing concerns of local officials by involvement in 
c urr ent f. hang ts 

HOLT, J Public Interest Research Croup. New York PDSNR,P 
Parents Concerned About Indian Paint FLEISHER. Z S West Branch 
Conservation Association 62/10/15 PAULADINO, N J , AHEARNE, J F , 
GIlltJSKY V Commissioners 5p p 15755 OS3 24X 
Fiche 50-217. B2/1O/15, 9310200019 



8310200019 Advises that serious deficiencies in 

mill not be corrected since State of NY & FEMA not 
addressing concerns of local officials 6y involvemei 
current changes 

HOLT, J Public Interest Research Group. Neiu York 
Parents Concerned About Indian Point FLEISHER. I S 
Conservation Association 03/10/15 PALLADINQ.N J 
QILINSKY.v Commissioners 5pp 15755 OB3 24X 
Fiche 50-247, B2/10/I 5, 9310200019 



gency prflparednt 



PQSNER. P 
West Uranc 



ft d j ud i 



Act receipt of 800416 memo u/inap repts verifying inteiim 
na required of facilities in 8O02I1 confirmatory 
s Requests verification that Item F 2 in orders is met 
E 5 in U Gammill 800317 memo should be F 5 

, T 11 A5sistant Birector for Operating Heactors GO/06/13 
,S E Division of Reactor Operations Inspections Ip 
29-5 2-1X Fiche 50-?'I7, BO/O6/O3, S0062307SB 



eilO060235 Declines invitation to appear before Subcommittee on 
Energy Conservation '< foiuer Sub tommi t tee investigation is 

intrjsicn into ongoing regulatory proceeding i, threatens 

independence of Commas.! on 

MORGAN, C Morgan Associates MORGAN. C P uuier Authority of the 
St^jte or Meu York 02/09/30 QTTINQFR.R L House of Rep , Energy 
Cqinnerce lOpp 15619 360 24X Tiche 10-247, 82/O9/3Q, B210060235 

[1^1.0040109 Order CLI-82-201 r eques 1 1 ng ASLU reconstituted by 
C.LI-S2-24 to estimate uhen recommendations called for bg 
Ct.l-81-aa can be provided 

C*HLH,S J Office of the Secretary of the Commission B2/10/01 
Atomic Safety and Licensing Hoard Panel Ip 15560 350 SAX 
Fiche 50-217. 92/10/01,82100.10109 



83102203B9 Subroittal of comments on ASLB B21001 mem or an li urn ft o 
motion for ASLQ to Issue reformulated contentions on 
Commission Questions 3 te 4 by 331115 i to restore 
Contention 6 2 Certificate of Svc enc 1 

TQSCANI.K Parents Concerned About Indian Point 83/IO/lS 
Atomic Safety and Licensing Board Panel 2pp 15777 307 
Fiche 50-247, 92/10/15,8210230339 



621O2I0370 Requests destruction of Uest Branch Conservation Assor 
821011 reply to B21001 memorandum t, order !> substitution of 
enc 1 veri ion 

FLEISHER, Z B West Branch Conservation Association 92/lO/lB 
NRC - No Detailed Affiliation Oiven Ip 157i4 099 24X 
Flihe 90-247, 82/10/19,6310210390 



B210210397 Response to B21O01 memorandum fc order Certificate of Svc 
enc 1 

FLEISHER. Z B Uest Branch Conservation Association 82/1O/13 
4pp 157A4 100 24X Fiche 50-247, B2/1O/1B, 8210210390 

310200059 Response to AELQ 821001 order ASLB should narrow language 
01- ASLD Question 1 1 ! adapt proposed schedule for 
continuation of proceeding Certificate of Svc end 
MDi3RE,J . MCOURREN.H J Hearing Branch 1 B2/1O/19 9pp 
15757 290 24X Fiche 50-247,62/10/19,8210200059 



Mcrrorandumi order icslating contentions & establishing 
procedures based on Commission guidance 

uLEAEDU. J P . PARIS. O H , &IIDN. F J Atomic Safetij and Licensing 
Hoard Panel 02/10/01 '12pp 15609 311 24X Tiche 50-247. 
tlSJ [0/O1 , B2I0050254 

n2iO]30335 Motion for A&LI) to direct NRC to reschedule B210I3 meetinq 
ui j u(,ils '. Bandia in Alo uijuorque. (JM to either New Vort.NY or 
1,'a ih ing torn DC Intervenar unable to attend meeting In Nil 
W&ISS.E I? Union of Concerned Scientists WEISS, E R Public 
Interest Research Ordup-, New York H2/1O/07 Atomic Safety and 

Licensing Board Panel 3pp 1 S6S2 OSQ 24X Tlche SO-S47, H2/10/O7, 
3310130335 

- -O21-0130337 Motion for Commission to direct that all future meetings on 
IS5UBS be held in NY o' Wash i ng ton. DC 1 that intervenors be 
given notice concurrently u/other parties 

I^EISS.E R Union of Concerned Scientists WEISS. E fi Public 
Inte.ost Research Group. Neu York S2/10/07 Comm! saionori 

2pp 156S2 033 24X fiche 50-2-17. B2/IO/07, B2IO1 30335 



. Reply to ASLG B3IOOI memonandum fc order Plant should be 

totally reinspected u/appropi la te testa Of pi p ing. e I ec tr ical 
', tqntrol SMS conducted List of parties should bo shortened 
to active participants Certificate of Svc enel 

FLCISH^f),! S West Branch Conservation Association B2/10/I1 'Ipp 
1S7IB !?! 34X Fitho 50-247, 02/10/1 1 , 8S1Q1SQ203 



Order denying UCS/NY PIRC B31O07 motion to direct NRC to 
reschedule B21013 meeting in Al bunuerque, NM to NY or 
Wa sh ing t on, DC Only Commission has jurisdiction over NHC 
porrormance of administrative responsibilities 

PfiRIS.D H . SHON.F J , GLEABDfJ. J P Atomic Safety and Licanainf) 
Uoard Parvet B2/10/12 Union of Concerned Scientists 3p p 

L3701 194 34X Fiche 50-247.02/10/12,9210150092 



S21022Q375 Request for nod of ASLB 8210O1 order, to permit Roe Han* 
County to continue presentation of witnesses re Commission 
Questions 314 prior to taking evidence on Questions 1,2.S. 
6 t, 7 

THORSEN.E D Rack land County, NY 92/10/19 Atomic Safety and 

Licensing Board Panel 2pp 15779 187 24X Fiche 50-247,62X10/19. 
B2 I022037S 

B21O2HO'1IO Joint response of inlervenors to ASLB B2100I order Meaning 
of "discussion" of probability should be clarified & ASLD 
should immediately reformulate contentions on Questions 
3 fr 4 Certificate of Svc enc 1 

UEIBS.E R, Union of Concerned Scientists HEISS, E R Harmon J. 
Weiss B2/10/19 Atomic Safety and Licensing Board Panel I3np 

1577S 313 24X Fiche 50-247, 62/10/19. B210220410 

B21O250031 Proposed hearing schedule Certificate of Bvc end 
GfiANBENBURO. D Consolidated Edison Co of Neu York MORGAN, C 
Pouer Authority of the State of New Yorl MORGAN, C Moroan 
Associates B2/10/19 9pp 15797 049 21X Fiche 50-247, S2/ 10/i9, 
B2I02500B1 

82102502I& Response to ASLB 931001 order reformulating contentions 
Opposes admission df new Contention I 1 , Content! ons 2-l(a)- 
(d),2 2<a> & 2 2<b> ^ ASLC Question 2 2 1 Notice of 
appearance % Certificate of Svc encl 

MGRQitN,C Pouer Authority of the State of New York MORGAN, C 
Morgan Associate* 82/10/19 Atomic Safety and Licensing Board 

Panel 35pp 1S7B9 166 2flX Fiche 50-247,93/10/19,9210250216 



8210290265 Notice of appearance in proceeding 

BAUM,B L Power Authority of the State of New York 
Morgan Asfociatet B2/10/19 Ip 15791 153 24X 
Flch 50-247. 82/10/19, B21Q3S0265 



3310150141 Order scheduling B21 103-04 prehearing conference in Whitp 
P]ainsiNY re oral argument on responses to ASLQ S2IOOI 
memDrandi/m ( order restating contentions 

GLEASON. J P Atomic Safety and Licensing Board Panel B2/10/13 
2pp 1569B 306 24X Fjche SO-247, 82/10/13- B310I 50141 



Motion in response to ASLB B21001 order, reques t ing 
clarification i importance of term "d i ECUSB Ion" & eitension 
of time to determine position re Issue of consolidation 
Certificate of Svc encl 

KAPUAM. C Neu York, NY 82/10/13 Atomic Safety and Licensing 

Board Pjnel 7pp 1S719 123 24X Fiche 50-247, QS/IO/1 3, B21 01B013B 

9510200069 Telegraphic order granting licensee reo,uest for e'tenaior of 
t l.n& to file responses to B21OO1 order All party responses 
due B2I019 

GI.EASOH.J P Atomic Safety and Licensing Board Panel B2/10/I4 
Pojtr Authority of the State of Neu York Ip 15757 2BO 24X 
Fjche 50-247. 82/10/14, B210300069 



B2102502B7 Motion for order reversing ASLQ B31001 memorandum fc 
order re taking of testimony on Questions 3 d 4 Ii 
establishing schedule for presentation of testimony upon 
expiration of 120-day tloeft Certificate of Svc encl 

VETERE.L A Hettchester County, NY B2/10/1? Atomic 8Sfe-tg and 

Licensing Hoard Panel 7pp 13791 165 24X Fiche 30-247,63/10/19. 
8210250287 

B2102S03S4 Memorandum re ASLB B21001 order reformulating contentions 
Object i to neu Contention 1 1, Bases la & 111 , Contentions 
S l(a),2 Kb), 2 Kc),2 Hd>,2 2<a) S< 3 2(b) Certificate of 
Svc end 

BRANDENBURG., B Commonweal th Editon Co B2/10/19 Atomic Safety 

and Licenoing Board Panel 49pp 15790 243 24X 
Flch SO-247, B2/10/19. B210250324 

S2102SOQ99 Motion fur leave to file memorandum in reponte to ASLD 
B31001 order 1 day lati Mechanical difficulties encountered 
iii/uord processing iquipment Certificate of Svc encl 
BRANDENBURG* B Consolidated Edison Co of New York 82/10/20 
CnmmisiionBri 6pp 15787 062 24X Fich SO-S47, B2/ 10/20, 
B21O2S0099- 



38 



DOCKETED ITEMS 



6210200242 Requ e-sta Cnmraiss i on issue" order directing all meetings 
between NRC t licensee be held Ih Wash irig ton, DC or NY. that 
intervanori receive notice of meetings cone urrently u/utils 
fc that intervenors be provided u/minutel of 821013 meeting 
WEISS, R Harmon i Hem WEISS, E fi Union of Concerned 
Scientist! aa/10/25 PALLAD1TO.N J , AHEARNS, J , QILINSKV, V 
Ccn-.-nissioners 2pp 15337 05B 34X FUho 50-347. B2/ 10/23, 
B2102BOP42 



93103BQ330 Advises that NRC does not intend to respond to intervenor 
motions filed in response to ASLD 621001 order until after 
021103-0-1 preparing conference 

MOORE. J E Hearing Branch 1 S2/JO/27 GLFA3ON. d P . SHQM, r J . 
PARIS, D H Atomic Safety any Liceniing Board Pane] Ip 15FJJ7 
24* Fuhe 50-247,92/10/27.8310260230 

8210290353 Response opposing UC3/NV P1RO 091012 motion to direct NRC 
reschedule all future nettings an hearing Issues In NY or 
Mashing ton. DC NRC should be permitted fleiiblHty to 
detsrnln-e most appro-priat e location U/Certi f icat* of Sv< 
KCGURREN.H J Hearing Branch I 93/10/27 Commn* ( oners 9pp 

I3B39 04B 24* Fiche 50-247,82/10/37.0210980353 

S21Q2W271 Advises that, licenioes plan to address all mat ten raisoi] 

responias/mot loni re ASLB H2I001 memorandum & order at 
B31103-Q4 prehearlng conference 

DRANDENBUHO. B Cgnsol Ida ted Crflson Co oP Hem York MORGAN. C 

Pn'Jer Authority of the State of [Jeiu York MORGAN, C Morgan 
Asiociatei 33/10/27 GLEASOW.J P , SHON. F J , PARIS, H Atomic 

Sjfetu and Licensing Hoard Panel 2pj> 15BB3 01 a P4X 
Fiths 50-247. aa/10/a7,BaiOS90271 



H General correspondence 



B0073IOI17 Forward* request for add! info requirad to complete Irani), 
fleiearch Ctr evaluation of adequacy of steam generator Si 
reactor coolant pump supports Request should be sent to 
I icenae-e 

HlCHMAM.k R Operating Reactors Assessment Branch DO/O7/H 
VARCAiS A Operating Reactors Branch 1 7pp 03056 2fcg ^4* 
Fich* 3O-247, BO/07/lfl, 8007310117 



0CGB05022Q Request! LB Mar ah be permitted to continue reviewing 
overpressure protection ys J. associated Tech Specs 
NCViAK.T Assistant Director for Operating Reactors QO/0'/ iO 
ERhSTiM L Assistant Director for Technology Review j [> 
03079 175 24* Fiche SO-S47, QO/O7/30. S000OS0220 



B00813074fl Suffmaru of 900617 meeting u/utils in Dethesda.MD i- 
conlainment structural response to core mo 1 1 accident 
sequenc e; 

hEVER.J F Power Systems Branch 90/07/31 Power Quitimi 

3pp 03246 2'13 24X Fiche 50-247,00/07/31.0000130711 



insp of hijdraul it 
icessiv* 



S009100IO'l Approves Tech Specs revision proposal r 
tluid o f snubbers supplied by common reservoir & 
Fluid lots due to eiternal tubing leakage 
BARRETT. LH Operating Reactors Assessment Dranch (10/00/05 
VAUGA. S A Operating Reactors Branch I (Pro B0043Q) In 
03SI& Ofl 24X fiche 50-5.17, BO/OB/05, QOO91 00101 

6008310627 Forwards request For addl info re spent fuel pool rrrailir 
Info needed to complete review of uti I application for 
license amend 

fiUBENSTEIN, L. S Assistant Director for Care t, ConUlnmoiH <>|ivtA> 
BO/OB/OQ NOVAK.T H Assistant Director for Opeiating Hp,i L tuii 
3pp 0339? 306 24X Fiche SO 247, 00/03/00. 



6.2 10 350272 Requests substitution of SL Qaum u/TH Fray on official eve 
list for proceeding -Related correspondence 

COLARULLI.P F Morgan Associates CDLAfiULLI, P F Power Authority 
of the State oF flau rork &3/10/I9 STUCKV.B H Docketing S, 
Servicei Branch Ip 15791 190 E4X Fithe 50-247,33/10/19, 
3310230273 



Forwards recomnnnilations on staff tasfc action pln \ 
sent to licensees For revicu { response 

DAR-RETT.LH Operating Reactor! Assessment Branch CiO/QU/OSI 
VAROA. S A Operating Reactors Dranch I (Pre 000-120) flop 
0351i OA6 2flX Fiche 30-247.80/00/09,8009100100 



Advisori; Conmitte* on Reactor 5>afguards re-ports t. c orrespondenci 

82071B0077 Foruarils comments on PRA Itudy dealing u/selsmlc halai-d 
Valldit<| of c ont lus tons rest on quality of primary data 
tjaii ti asiuiript Ions in both itudiei Reptt ape not valid risk 
asieiimenti duo to data bale limitations 

POHEROV, P H Rondout Alsoclatvi PDMEI10V, P H ACRB - Advisory 
Committee on Re-actor Saf*auard* 33/00/24 OKRENT, D ACWB - 
Arfvdory Cnnnnlttee on fleactor SafejuariJa 7pp 13976 001 34X 
Fiche 50-003, 62/06/34. B2071BQ077 



B009030334 Formards Reactor Fuel Section questions re LOPftfl f,io 1 
core prevmualij containing HIPAf? fuel Questions shouli] lit 
roruarded to I icertseo 

flUBEN6T,EIN, L S Assistant Oireclor for Core >, Canlall^ftn )'V>1 
QO/09/1B NOVAK.TM Assistant Director for Operating flidClo 
3pp 03463 O33 24K Fiche 50-247, QO/OS/ 10. 8009030^4 

SOO'?uB04i,6 Forward! response to BOOB20 rD<(uest for stjilut rtpt I 
Iion/Itufian Point task action plan Re sponi i h i 1 1 tl as *r In 
area of severe accident mitigation FeaturHs fc not in interim 
operational actions portion 

MEYtR.J F Reactor Systems Branch 00/08/25 NOVAK, T M ^i 
Director for Operating Reactors 2pp O3404 009 VAX 
TLchB 30-003. ao/00/25, BOO-?OBn4A(, 



DOCKETED ITEMS 



39 



tt 0240644 Forwards safety evaluation 



for 



electrical override of manual 



ntainment ventilation Isolation V 



ion Feature: 
o> li jr ESF sys 

QLSHIUSKI.J A Operating Reactors Assessment Uranch SO/lO/06 
VASOA, B A Operating Reactors Branch I 3pp 03661 092 24X 
Flthe 50-247, BO/ lO/Gd>, 8O1Q240644 



8210O10401 Forwards application to amend Licenses DPR-26 !< DPR-5, 
changing Tech Specs re facility organuation & Unit 2 
Tech Specs 3 6 & 4 4 re containment isolation valves 3 12 t 
4 12 in pipe lines Class I, II t< III fees sue] 

O'TOGLE.J D Consolidated Edison Co of Neu York 83/OB/3I 
VARGA.S A Operating Reactors Branch I 3pp 15572 211 24X 
Fiche 50-003.03/08/31,3210010401 



G'flO7Q3l2 Advises that FranHin Research Ctr uas notified to proceed 
j/ final evaluation of fracture toughness of steam generator 
' reactor coolant pump supports Due to util BOOB2B request 
tor dp Idij, app ropr i ate conservative assumptions mill be made 
OLSHtNSIU J A Operating Reactors Assessment Branch NRC-03-79-I IB 

QG/lO/Qd VrtROA.S A Operating Reactors Branch 1 2pp 
03t&l 209 24X Fiche 50-217. BO/ 1O/O6. BOIO270313 

pn i i I IG034 Requests Instrumentation % Control Sys Branch evaluation of 



end Licenses DPR-26 tt DPR-5. revis inp. TB 
e facility organ! la t ion for 



u I i 1 respnn-,05 to question 
dt faci I i ties Info will aid b 
te-.at.ures re backfltting oh se 
1PE1S. T P Ruactor Systems Ii 
Instru^entaliun i Control Stjs 



50-217 QO/IO/0? B0111100Q4 



incore ins tr umen ta t ion tubes 
inch evaluation mitigation 
;re mitigation Features 
inch 80/10/09 SATTERFIELD, R 
;ms Branch Ip O2227 001 24X 



Foruarils NRC questions '. u> i I answers re hackfltting of 
severe accident mitigation features Evaluation needed In two 

Ul 5 

SPEIS. T P Reactor Systems Branch 
'-rut tural Engineering Branch Ip 
Fiche S0-?i17, BO/10/17, BOIO2BOO9B 



BO/10/17 
65767 184 



SCHAUER, F P 
24X 



'IQM200025 Forwards Pomar Sys Branch evaluation of difference! 
Indian Point 2 t, 3. in response to technical assistance 
i e quest Requests meeting u/licensee prior to formal responsi 
'o evaluation 

tHEC^ P S Assistant Director for Plant Systems BO/IQ/31 
fOVAI'.T Assistant Director for Operating Reactors 21pp 
03743 111 24X Fiche SO-2'17, BO/ IO/21 , 801 1200025 



']OL 1210204 Forwards draft safety evaluation of licensee response to 
lasV Action Plan Hen II E 1 2 Automatic initiation logic, 
i its tru--entat i on & associated circuitry ', automatic feedualer 
i 1 ou indication channels meel safety-grade requirements 

, K Instrumentation ft Control Systems Branch 00/10/32 
. E Operating Reactors Branch I Bpp 03744 123 34X 
D che SO- 247. 00/10/22,901 12LO284 

f)1OlO5052EI Forwards questionnaire to be completed by each neai term 1)1. 
' each liceised plant by B01107 Objective 15 to assess best 
collective judgment re eitent of problems recently 
eipersenced at facility 

UlRDANiE L Office of Inspection ', Enforcement, Office of the 
ftiraetoi 80/10/28 BRUNNER, E J Region I. Philadelphia, Reactor 

Operations Nuclear Support Branch LEWIS.R C llegion 2. Atlanta. 
Pip-actor Qperations Nuclear Guppoit Branch HEISHHAN.R F Region 3, 
Thicagar Reactor Operations tluclear Support Branch 2pp 943B1 JBii 
2.1* Fiche SO-24/.aO/10/2Q,B101050520 

1O11O70227 Requests all operating reactor project managers to conduct 
telephone survey u/1 icensees to determine If plants are 
susceptible to svc water leaks Results of survey requested 
bv 001031 

IJLSHAII, L H Operating Reactors Branch 1 00/10/29 Operating 

H*actors Branch 1 Ip 03715 124 2-)X Ftche 50-347,80/10/29. 
DO I IO70227 

Bill 1120679 Forwards response to request for determination of licensing 
basis for reactor pressure vessel & containment fan coaler 
jifs re FSAR requirements & current NRC criteria Licensee 
must perform thermal & stress analysis of vessel 

LAINAS.G C Assistant Director for Safety Assessment GO/10/39 
EISGNHUT, D Division of Licensing 6pp 03719 357 34X 
Tic he &O-247. BO/ 10/29,601 112O679 

G011100165 Submits revision of relative concentration for thorb-term 
releaie following an accident Facilities aicluiion radius 
found to be Sao meters resulting in relative concentration 
equal to 00091 sec/cu meter In louthusst direction 
HOUSTON i R U Accident Evaluation Branch 80/10/30 VAROA, S A 
Operating Reactors Branch I Ip 6576B 03 1 34X 
Ficho 50-347,00/10/30,0011100163 

9207050095 FOIA request far eight categories of record! re staam 
generators tt staam turbines 

LONG. D J Winthrop, Stlmson, Putnam b Roberts 82/07/13 Office 

of Administration 3pp 15645 060 24X Fiche 50-247,02/07/13, 
6207050085 

&21 0070007 Responds to FOIA request for eight categories of records re 
steam generators & steam turbines App A documents provided 
in R Utfell FOIA Request 31-313 Foruiard* documents listed In 
App B 

FELTON, J M Division of Rules and Records 82/09/10 LQNQi D J 
Uinthroa, Stlmson, Putnam t< Roberts 9pp 15645 O63 24X 
Fiche 50-000,92/08/10,9210070007 



-B210010409 Application to 

Spec Figures 3 3 & 6 2-2 

Units I 1, 5, respectively 

O'TOOLE, J D Consolidated Edison Co of New York 

15572 214 34X Fiche 50-003. B2/OB/31, B2I00104Q1 



8210010414 Proposed revisions to Tech Spec Figures 3 2 & 6 2-2, 
reflecting change In organizational structure to include 
position of operations superintendent Safety assessment 
enc 1 

* Consolidated Edison Co of New York 92/OB/31 6pp 
15S72 216 24X Fiche 50-OO3. 02/OB/31 , 821 0010401 

8310010425 Application to amend License DPR-26, revising Tech Specs 
3 A It 4 4 to establish requirements for action required uihen 
containment isolation valves are inoperable & reflect 
changes to isolation valve provisions 
0'TOOLE,J D Consolidated Edison Co of New York B2/OB/31 2pp 

15572 222 24X Fiche 50-O03, 82/08/31, B2 100104O1 

--8210010439 Proposed revisions to Tech Specs 3 6 & 4 4, establ 1 sh ing 
specific requirements for action during i noperab i 1 i ty of 
containment isolation valves & reflecting changes d add it on a 
to isolation valve provisions Safety assessment encl 

* Consolidated Edison Co of Neu York 82/00/31 20pp 
13572 234 24X Fiche 30-003,82/08/31,0210010401 

8310010443 Application to amend License DPR-26. revising Tech Spec 
Sections 3 12 & 4 12 to defflect editorial change 
safety-related pipe lines it to efflcct editorial change 
O'TOOUe.J D Consolidated Edison Co of New Yorfc 82/08/31 2pp 

15573 244 24X Fiche 50-003.82/08/31,0210010401 

0210010449 Proposed revisions to Tech Spec Sections 3 12 !< 4 13, 
reflecting redesigned support sys for saf ety-related pipe 
lines tr to effect editorial change Safety assetsment encl 

* Consolidated Edison Co of Neu Yorl 93/08/31 IBpp 
15572 24& 34X Fiche 50-003,82/08/31,0210010401 

62100S0049 Notification of 620929-30 meeting m/util t, Franklin Research 
Ctr in Buchanan, NY to discuss contractor review of util 
radiological effluent Tech Specs 

THOMA..J Operating Reactors Branch 1 B2/09/23 VARQA. S A 
Operating Reactors Branch 1 2pp 66367 356 24 X 
Fiche 50-247,82/09/23,8210080049 

3210130603 Informs that revieu of 010731 response to Generic Ltr Bl-01, 
"Qualifications for Insp.Eiam t Testing (< Audit Personnel," 
complete Commitments b eiceptlons to Revision I to Reg Quids 
i SB tt Reg Quids 1 146 acceptable 

VAROA, S A Operating Reactors Branch 1 B2/09/27 O'TOOLE, J D 
Consolidated Edison Co of Neu York 2pp 15692 347 24X 
Fiche 50-217,92/09/27,9210130603 

6210130435 Foruards responses to Items 1,3, 4 ti 3 of NRC 820319 request 
for addl info re control of heavy loads (NUREfi-0613) Info 
addressing Items 2, 5, 6 & 7 mill be submitted by 030131 
O'TOOLEiJ D Consolidated Edison Co of New York 93/09/30 
VAROA, S A Oparating Reactors Branch 1 7pp 15682 019 24X 
Fiche 50-347,82/09/30,9310130455 

Q2101Z0353 Foruardl Initial comment! on Sandia Natl Labs 930925 
prelimnary draft 1 tr rapt on revieu * evaluation of 
probabilistic safety study, addressing wind, seismic, fin. 
preiiurlied tntrmal shock & tan coulrr issues 

O'TOQLEiJ D Consolidated Edison Co of Neu York BAYNE. J P Power 
Authority of the State of Neu York B2/10/0& VAROA, S A Operating 
Reacton Branch 1 63op 15652 215 24X Ficha 50-247,82/10/06, 
B2101202S3 

6210190693 Advises that results of 830920 *ve miter ays test prove that 
Indian Point probabilistic safety study reflect actual 
plant configuration Remaining plant Improvements In 920305 
Itr.eicept ATWS mad, to 6e complete by return to svi 
Q'TdOLE.J D Consolidated Edison Co of Neu York 92/10/08 
VAROArB A Operatinj Reactors Branch 1 Spp 15739 141 24X 
Fiihe 50-247, 8S/10/OB, B21O190693 

6210310032 Foruards request for addl info to complete revieu of TMt 
tttm II K 3 25, "Poutr to Pump Seats " Area* of conforming 
or deviation from stated position should be Identified ic 
info i-t design & operation of cooling sys provided 
VAROA, S A Operating Reactors Branch 1 B2/10/15 O'TOOLE, J D 
Consolidated Edison Co of New York 3pp 15774 360 24X 
Fiche 50-247,92/10/15,8210210033 



38 



DOCKETED ITEMS 



821Q2E0242 Requests Commission is-sue order directing all meetings 
ietuieen tJRC f, licensee be held in HasB ington, DC or NY, that 
intervenar* receive notice op meetings cone urrentlij u/utils 
t that intervenors he provided w/mlnutei of 621013 maetino 
WEISS. E it Harmon fc We ill WE I S3. E R Union of Concerned 
Scientists aB/10/25 PALLA01 NCJ.N J . AKEARNE. J , SILINBKY. V 
Goir.TiisHoiiBrs 2pp 15837 OSS 34X Mche 50-347,33/10/23. 
8210230342 

B21O2BOS30 Advises that MRC duel not intend to respond to intervenor 
motions filed In reijionse to ASLD 631001 order until after 
B21 103-04 nra hearing tonfersn.ee 

MOORE. J E H.arino Branch 1 S3/10/27 QLEASDN, J P . SUCH, F J . 
PAtllS.O H Atomic Safety and Licencing Board Panel lp 13H37 Oaa 
24X Fiche 50-347,82/10/37.6310280230 

8210290353 Rusp am* opposing UC8/I1V P1RO 021013 motion to direct NHC to 
reschedule all future meetings on hearing issues in NY or 
Washington. DC NIC should he permitted fleiihllity to- 
cjeterriina most appropriate location H/Certi f i Cate of Svc 
MCCURftEN.H J Hi 31- ing Branch I 92/10/27 Cominl is loners 9pp 

15637 019 24X Ficne 50-247,92/10/37,8210280353 

8aiOE90271 Advises that licensees plan to address alt matters raised in 
responses/motions TI ASUS 821OOS memorandum t orfler at 
E2UO3-G4 preheat-ing conference 

BRANDENBURG, D Consolidated Edison Co of New Yorl MORGAN, C 
Pojer Authority of the State of tltia York MCRGAN, C Horoan 
A&jocntes 83/10/27 CLEASON.J P , SHOW, F -J , PAIJI5,O K Atomic 
Safaty and Licencing Board Panel 2pp 13353013 24 X 
Fiche 50-247, 02/10/37.0210290271 



H General e orreiponqlBnci 



6007310117 Forwards rsqueit for add! info required to cocnnletB rr,iiiUii 
Hesearch Ctr evaluation of' adequacy of steam generator t, 
reactor coolant pump supports Request should be sent to 
I icensee 

WICHWW.tt R Operating Reactors Assessment Branch 3Q/O7/14 
VARGA, S A Operating Realtors Branch 1 7pp O3056 2fcQ $.% 
Fiche 50-347. 60/07/11, 3007310117 



3008050230 Bequest) LB Marsh be permitted ID continue r 
overpressure protection sijs !> associated Tech Specs 
NOVAK. T Assistant Director for Operating Reactors 
ERfJST.HL Assistant Director for Technology Review 
QDO/B 175 24X Fiche 30-3.17, BO/0//3O, 8009030230 



Bo/Q//'i<; 
[|> 



9009130744 Summary of BOOM? meeting ui/uUls in Qethesua. MO r* 
containment structural response to core melt accident 
Sequences 

I1EYER.J F Power Systems Dranch BO/07/31 Power (auiiim 

3pp 0326(> 243 34X Fiche 50-247- 60/O7/3 I, 000013074^ 



insp of hijil ran I 



6009100104 Approvo Tech Specs revision proposal r 
tluid of snubb*ra supplied bg common reservoii 1 li 
fluid lose tfue to eiternal tubing leahaoe 
BARRETT, LH Operating Reactors AssesBmant Branch 
VAHOrt.S A Operating Reactors Branch 1 iPre 500'12[i1 lp. 
03S16 071 24X Fiche 50-347, BO/Oa/05. B009IOO1O4 



BQOB210627 Forwards request For addl info IB spent fuel potil >r*>Ur, 
InFo needed to complete review of util application for 
I icense amend 

RUBENSTEIN.C S Assistant Director for Core J- Conlnlnme'il 'juilrai 
80/08/08 NQVrtK, T M Assistant Director f 01 Qpei alinj fi,M L,,, * 
3pp 03383 30A 34X Fichu 50-247,80/00/09,1 



321025-0572 Requests substitution of SL Baum u/TR Fray on official avt 
lut for praceadlng Related correspondence 

COLARULLI.P F Morgan Associates CDLARULH.P F Power Authority 
of the State of Neu Vark 83/10/19 STUCKY, S W Docketing t, 
Services Branch lp 15771 190 34X Fiche 50-247,03/10/19, 
3310390273 

Q Advisory Conmsttee on Reactor Safeguards report 3 & correspondence 

&2O71&Q077 Foruards comments on PftA study dealing ui/seismic hazard 
Validity of conclusions rest on quality of primary data 
bases & assumption) in both studies Rtpti are not valid rllk 
assasEments due to data bate limitations 

POKEROV, P M Rondout ftslotlats* POMERDV, P U ACRB - Advisortf 
Commibtea on Reactor Safeguard! 83/09/21 OKRENT, D ACRS - 
Advisorij Committee on Reactor Safeguards 7pp 13B7i 00 i 24X 
Ficho 50-003,62/08/31,0207150077 

P Dperatins license stage documents t correspondence 



8009100100 Forwards recommendations on staff task action plan t n ti 
sent to licensees For reviiiui >, response 

BARRETT. L H Operating Reactors Assessment Dranch KO/Oii/flll 
VARQA, 8 A Operating Reactors Branch 1 (Pre 00042111 lip n 
03916 Oi6 24X Fiche 50-247, BO/00/OEt, E100 1 ?! OOlOO 

BOOS030334 Forwarfls Reactor Fuel Bectlan quoationa re tlll'ftH tnl i- 
care previously containing HI PA!) Fuel Questions ghoul it [is 
foruarded to liEenseo 

RUBENSTE1N.L S Assistant Director fur Core S- roiitflli.mBiil hji(,j 
80/03/18 NQVAK.T H Assistant Director for OnerjUinn U,iiH-nri 
3pp O34&3 022 24X Fichs 50-247, QO/OQ/1B, 00070301 VI 

6009080466 Forwards response tQ BOOQ20 request for slJilui rt"pl <r 
Zion/lndian Point task action plan Responsibilities Are in 
are* of severe accident mitigation features d not In liuai In 
operational actions portion 

MEVtiR.J f Reactor Systems Branch BO/OB/35 NEIVAK. T H ftio] 
Director Por Operating Reactors 2pp 03404 007 J4x 
Tiche EO-003, 80/OS/29, 600^000466 



8006240951 Diseysus postulated ful handling accident inililt 
tontainmenti bated on llonm 77061S accident analysis 
Analysis includis uiont ilngl* failure during accidant 
Safety evaluation & containment purge iija Tech Specs end 
DAfiREtTiL Operatins Reattors Assessment Hranch BO/Ofi/Q6 
VAROA.S OpBratlng Bo-actor* Dranch 1 3pp 02767 167 34 
Fiche 50-247. 80/06/06, 6006P40B51 



8010150103 Discusses union representat i va allogation r li*r a 
security guard oDT-sonnal Add] info necessary prior to Nll{ 
investigation of alUgotlons 

WARIl.W J Office oF Inapection fc CnforcBmont, OfPlc nt l 
Dlrnctar 80/09/29 Officn of Inspection b izitfoi ctmtttt, 

the Director app 03630 36E) 24X Tuha 30-347, 00/01) ijft, 
BOI0150I03 



9007010658 Operating ftsactor Ev.nt Memo BO-7 re nearlu aUultaneoui 
trip* of Units S fi 3 Event uat of negligible safety 
significance & trips unre unreloteil t coincidental 
EISEMHUT.D Divi*ion of Llnniino 60/06/13 VQI.LHER.R H 
Division of Enginring MATTSQNi R J Division of Safety 
Tethnologu HAN*AUER.6 H Division of Human Factors Safety Snp 
02BI5 14,5 2-1X Flch 50-2il7iSO/06/13,B00701063B 



BO 09250 2 31 Buhmiti dascriptlon of uorV being dona on *.ni)yiii at 
releases from Facilities Bimpl* l-D mul ticampartminl U T r*i 
hydraulic code being written to analyie variety of I VIJI) 
designs Related data one I 

FENSTERMA.CHER Ractor Systams Branch BO/09/JO ttPLlli. t r 
Reactor Systems Dranch 4pp O3589 297 SIX Hr* W) inf no. 
6007250234 



6007O7044B OoiraSino Htactor Evint Hirno BO-B re lo*i of offsite pouer 
Efftcts at thunderstorm resulted in total Ion of offiltl 
DOUJBT Etiirgencij dl*nl generator* functioned properly 
EISENHUT.D Division of Mctnsing BO/06/13. VOLLMER.R H 
Division of Englnvering ROS3.D-F Division of Systems Inteoration 
(pr BllQQSI HAHAVER.S S Dtviilon of Humtn Factors Safety Bpp 
02BS1 319, 2 Ficha 30-247, 60/OA/ 13, B0070704.4B 



B010B20234 fin pond i to Q00717 rquet r control room rsvt lu iwc 
Itr d*tJellrf tivt addl itemt to noar-term OL rnqiijr*nl 
Itam III 3 4 rpqulrns analysis of control room 
habltahtlUu- ty BI0101 

HOUBTOM, R H Accldenk Evaluation Branch BO/0/23 VAflO* s * 
Opratins Raactori Branch 1 lp 03360 001 S'X 
Flch* 50-247r 90/09/25. B010S20334 



B007150303 Notifies that review will b> cunductid cf Qffshor* Pouar 
fihort-tirm rlsfc ituJ usfng various r*iources, in rt*poni> 
to SOOfiOS requtlt Eva luatjon ui 1 1 be submitted 1 by 800922 
MATrsQN, R J D-ivisUn of Saftty Technology. BO/07/02 

ersenHur, a o D V (ion of Lic*nting Spp oa^sa 301 

F(ehi 50-a 



90a72B0312 Sum 
*ccidentt on 
CODELL.R Hy 

' Hl|d 



ij < aOOt2B mtttin) u/util rt Imp.litat ions of Clais 9 

quid pathuau* at P*cilitij, 

itleait t, 4<itechnfcal Engine erlng Branch flO/07/OB 

D i lc fc 80t ":l""=l Engin..riT>j Brancd 9p<i. 
rich, so-sw, ' 



B0103107B3 Foruardi rvcaaimindatic.nl for mentino auiJ|) 
<nin flow rtqulreminti Licen**i must dBontrt tf'e^V 
removal Por 10 minute i u/o optrator action or ret contro 
valvi throttled position 

CHECK.P S Atiiitant Director for Plant System* 
Nt7WK.rM Assistant Director for Optrating Reactart 
03647 104 24X Ftch 90-247, SO/09/aB, BOI03107B3 

6010240329 Dlicuiits human factor* control room dJgn in 
on 800219-22 <, 900310-11 Cornetlv. action* prot.dur.. 
ImpHmantation ithadijle provided. Con Ed ti PA8NV control 
daslgn rpti found incomplete 
MODREiV.A Divtiion of Human Factors Bafitij- 
OCSHINSKIiJ Division oi Lltnins 3pp 036S9 
Fichf SO"Sfl7. 80X09/29, 8010340339. 



fl,^f v tl^ 



DOCKETED ITEMS 



39 



in 10 2406 44 Forwards safety evaluation re electrical override of manual 
actuation features for containment ventilation isolation t 
n'her ESF s ij * 

ULHINSK[.J A Operating Reactors Assessment firanch BO/10/06 
W,3GA S A Operating Reactors Branch 1 3pp 03661 093 34X 
Fithe 5O-247, 80/10/0-6. B0102'IO(.44 



B2100104O1 Forwards application to amend Licenses DPR -26 t DPR -5. 
changing Tech Specs re facility orflan i lation & Unit 2 
Tech Specs 3 & t, 4 4 re containment isolation valve* 3 1 2 & 
4 12 in pipe lines Class I.I! d III fees encl 

P'TOCILE.J D Consolidated Edison Co at He ui York 35/03/31 
vARGA,S A Operating Reactors Branch 1 3op 15572 211 24X 
Flche 50-003,02/03/31,8210010401 



3i~i|02703l2 Advises that franHin Research Ctr iuas notified to proceed 
i_' final evaluation of Fracture toughness of stnam generator 
' reactor coolant punp supports Due to util BOOB2B request 
lor delay , <ap p ropriats conservative assumptions null be made 
OLSHfMSC 1, J A Operoiing Reactors Assessment Branch NRC-03-79-1 IB 

B-0/1O/CK. VAROA, S A Operating Reactors Branch ! 2pp 
O34&1 209 24X Flche 50-247,00/10/06,6010270313 

sOllllCOai Bequests Iris ti umentat i on f, Control Sys Drafich evaluation of 
Ljlil responses to questions IB intore instrumentation tubes 
at facilities Info mill aid branch evaluation mitigation 
lectures re b^ckfitting of severe mitigation features 
SPEIS 1 P Ruactor Systems Branch 80/10/09 SArTERFIELD, Fl 



?n tat 1 un !. Cc 



)1 Systems Branch 



Pith? 5O-217, 0O /1 0/07, BGl 1110084 



IP 



02227 001 34X 



Forwards NRC questions * uti 1 answers re backfittlng nf 
ccident mitiijation features evaluation needed in two 



SfEIS, T P Reactor Systems Branch 
S'ructural Engineering Branch lp 
Fiche 50-247, 00/ IO/ I 7, 801 02E009S 



60/10/17 BCHAUED.F P 
65767 104 34X 



90L1S003S5 Forwards Power Sys Branch evaluation of differences between 
Indian Point S It 3, i n response to technical assistance 
lequest Hefltieits meeting u/licensee prior to Formal response 

CHECH, P E Assistant Directoi for Plant Systems BO/10/31 
hC*.AC,T Asa (.slant director for Operating Reactors Hipp 
G3743 111 24X ClLhe 50-247, BO/10/21 , 801 1200025 

IQllSlQ-SB'l Forwarils draft safety evaluation of licensee response to 
lask Action Plan Itan II E I 2 Automatic initiation logic, 
I us tr ur-c'n ta f i on >t associated circuitry I, automatic feeduater 
rlotu indication channels meet safety-grade requirements 
SATTERFJE1D, H Instrumentation b Control Systems Branch BO/10/22 

VARGfl.S Opeiating Reactors Branch 1 Bpp 03714 123 24X 
Pictio 50-347. 00/10/22, B01 1310201 

I1O1O5052B Fcruards questionnaire to be completed by each near-term UL 
t- each licensed plant by 801107 Objective is to assess best 
collective judgment re eitcnt o t problems recently 
eipcr i em ed at facility 

JORDAN. E L Office of Inspection t Enforcement. Office of the 
Director SO/1O/20 BFiUNNER, E J Region 1, Philadelphia, Reactnr 
Operations Nuclear Support Branch LEWIS, n C Region 2, Atlanta, 
React Jr Operations Nuclear Support Branch HEIBKMAN.fi F Region 3, 
Chicago. Reactor Operations Nuclear Support Branch 2pp "745B1 1H6 
24X Fiche 50-2'17, BO/IO/2B. B101050S28 

OIIO70527 Reque-sti all operating reactor project managers to conduct 
telephone turveu. u/1 icensees to determine if plants are 
susceptible to ivc uater teals Results of survey requested 
bit Q01031 

OLBHAIJ, L H Operating Reactors Branch 1 BO/IO/B9 Operating 

fieaclors liranch I Ip 03715 124 24X Flche 50-247,90/10/39, 
0011070327 



Foruiards response to request for determination of licensing 
basil for reactor pressure vesael fc containment fan cooler 
si/s re FSAR r enulrements t current NRC cnturla Licensee 
must perform thermal t> strest analysis of vessel 

LAINAS, C C Assistant Birector for Safety Assessment BO/10/29 
FISEWHUT, D O Division nf Licensing 6pp 0371? 337 24X 
Fiche 50-247. flO/IO/29, SOI 1130679 

011100165 Submits revision of relative concentration for short-term 
releaie fnllouinj an accident Facilities exclusion radius 
tound to be S2O meters resulting In relative concentration 
eq.ua] to OOO31 sec/cu meter tn jouthuest direction 
HOUSTCM. ft U Accident Evaluation Branch 80/10/30 VAROA, S ft 
Operating Reactors Branch 1 ip 6576B 021 24X 
Flchn 50-247,60/10/30,0011100163 

207050095 FOIA rxtuest for eight categories of record* re steam 
gBtiHrators b s taam turbines 

LOMO. D J WlTithrop, Stimson, Putnam t> Roberts B2/07/13 Office 

of Adminntration 3pp 15643 OfiO 24X Flche 30-347,02/07/13, 
82O70300S5 



621001O409 Application to amend Licenses DPH-26 fr DPR-5, r evi s ing Te 
Spec Figures 3 2 S- 6 3-2 re facility organization for 
Units 1 & 2, respectively 

O'TODLE, J D Consolidated Edison Co of New York 62/09/31 2n 
15372 314 21X Fichfl 50-003, B2/OB/31, 82 I 0010401 

B21001O414 Proposed revisions to Tech Spec Figures 32*6 2-2, 
reflecting change in organisational structure bo include 1 
position of operations superintendent Safety asseisment 
encl 
Cc-nBoliifateK Edison Co of Now Vori S2/OB/31 fipp 

15572 2!6 24X Ffche 50-003, B3/OB/3I , B3 I 0010401 

02I001O425 Application to amend License DPR -26, revi 5 ing Tech Specs 
3 6 Si 4 A to establish requirements for action required when 
containment isolation valves are inoperable t reflect 
changes to isolation valve provisions 

O'TODLE.J consolidated Edison Co of Neu York B2/OH/31 2p 
15572 222 21X Fichs 50-003, B2/OB/31, B2 I 0010101 

321001O43B Proposed revisions to Tech Specs 3 6 ti 4 4, establ 1 ahing 
specific requirements for action during t noperabi 1 i tij of 
containment isolation valves & reflecting changes & add it an a 
to isolation valve provisions Safety assessment end 
* Consolidated Edison Co of Neui York 82/08/31 20pp 
13573 224 24X Fiche 30-003, BH/OB/31, 9210010401 

3210010443 Application to amend License DPR-36, rirvislnfl Tech Spec 
Sections 3 la & 4 12 to def fleet editorial change 
safety-related pipe lines b to efflect editorial change 
O'TQOLE.J D Consolidated Edison Co of Meu Yor* 02/08/3 1 S( 
15572 244 2fl* Fiche 50-003, 82/OB/3I. BB 10010401 

3210010449 Proposed revisions to Tech Spec Sections 3 IS & 4 13, 
reflecting redesigned support sya for safety-related pipe 
lines t- to effect editorial change Safety assessment en-El 
Consolidated Etfiaon Co of New Yorl S2/OB/G1 IBpf 

15573 246 34X Fiche 50-003,82/00/31,9210010401 

B2100B0049 Notification of B209S9-30 meeting Lr/util t, Franklin Ruaoar 
Ctr in Buchanan. NY to discuss contractor review of util 
radiological effluent Tech Specs 

THOMfW D Operating Reactors Branch 1 82/07/33 VAROA, S A 
Operating Reactor! Branch 1 Spp 64367 336 24X 
flche 50-247j 92/09/23, SaiOOB0049 

8210130603 Informs that revieu of 010731 response to Generic Ltr Ql-< 
"Dual if ications for Insp, Eiam * Testing tc Audit Peror.nel, " 
complete Commitments ti eiceptions to Fie vis ion 1 to Reg Quid's 
1 53 It Reg Guide 1 146 acceptable 

WROA.8 A Operating Reactors Branch I 82/09/37 O'TOOLE, J D 
Consolidated Edison Co of Neu York 2pp 15692 947 24 K 
Fiche 50-247.82/09/37,9210130602 

6210130433 Forward! responses to Items 1,3,4 & B of NRC 820313 runnel 
for addl Info re control of heavy loads (NUREO-0612) InPp 
addressing Itemg 2,5,6 & 7 ul 1 1 be submitted by 930131 
O'TODLGiJ D Consolidated Edison Co of NBU York B3/09/30 
IMRGA'S A Dptrating Reactor* Branch 1 7pp lfl6B2 019 24X 
Fiche 30-247,83/09/30.6210130453 

S210120S53 Forward* initial comment* on Sand is Natl Lib* BSOB23 
prelininary drift Itr rept on revieu *< evaluation of 
probabilistic safety study, addressing ulnd.aeiimlc.flr*. 
presiurlied therm*! shock d fan coaler issues 

O'TOQLE.J D Consolidated Edison Co of New York BAYWEj J. P Poi 
Authority of the State of Neu York B2/10/Q6 VAROA. S A. Opurat 
Reactors Branch 1 6Spp, 13652 215 S4X Fiche SO-B47, Ba/lO/Ot, 
8310I20S53 

S210I90i93 Advises that results of BB0920 svc uiater fut bait prov* t 
Indian Point probabilistic safety *tudy reflect actual 
plant configuration Remaining plant Improvements In 620303 
ltr,e>c*pt ATWB mod' to be complete ty return to svc 
O'TOQLE.J D Consolidated Edison Co of NitJ York S2/10/OB 
WROAiS A Operating Reactors H ranch 1 Spp 1S73B 141. 24X 
Kiche 30-247. 82/10/03. 8210190693 



310070007 Responds to FOIA request for eight categories of records re 
steam generators l< steam turbines App A documents provided 
in R Udell FQIA Request 81-313 Forwards document* listed in 
App D 

PEL TON, J M Division of Rules and Records 83/09/10 LOMO, D J 
Hint hi- op, gttmton. Putnam (< Roberts <?pp 15645 063 24X 
Fiche 50-OOO, B2/OB/10, 8210070007 



SI0310032 Foruardii request for addl info to complete revinu of TMI 
Item II K 3,25, "Power to Pump Be* It " Area* of confornanc* 
or deviation from stated position should bo identified k 
info re design Si operation of cooling lyi provided 
VAROA.S A Operating Reactors Branch 1 32/10/13 D'TOOLE, J D 
Consolidated Edison Co of Neu York 3pp 13774 360 24 X 
Fiche 90-247.82/10/13,8210210032 



DOCKETED ITEMS 



B.210280-12F] Forwards lafaty evaluation of ddoquaK-j of station electric 
distribution aijs voltages based on utll G3070 1 ? ] tr Sys 
voltages adequate flaviaui closed 

VftRQA, S A Operating fiedctors Branch 1 33/10710 O'TOOLE.J B 
Consolidated Edllon Cn of NBU Vorlt Spp ISftfaO Ql<7 24X 

FLclic Sfl ?47, H2/10/ 1(3,02 I 0-?BQ42(1 



taUr, to 



- -l33]C2iJCl'130 Ha Petij evaluation supc-ortlng adenuanj of 
d 1 strtbwt I n n IMS voltages 
-" Office of Nuclear ilflactoi Flojula 1 1 on, Director 

cat BOX i-icim 10-247. n;vio/in,a?iQ3B042<i 



station electric 
Q2/1Q/IB 7pn 



0210200133 "ftdenuaCLj f Station Electric Distribution tys, Woltanati. 
Indian Point Nuclear Station, Unit 2 " 

UOV. rt C i l/CUFfl, 1) A KOliO, Inc FIN A-64J9 00-EA-S307 Jld] 
&3,-07/30 PEVATTE,R L Division of Systems Integration (post 
anoosi I4pp isacso o.>a 31* Fteho 5o-5fl7.o?/io/ia.saioaaoi2H 



E},2 I tJawraOB Mot i Pi os of ctnni-ge& in estimated schedule of completion 

IMI Items II f I, "Mob lo Cos Monitoring." II D n, "Post- 

Accident S.nnrling." 't III D '1 -I- "Coniro) liontn 

" 



Mods will bff canplctjd by end of refueling 
Consolidated Eaison Co of Maul York SSflO/lt 
poiating Reactors Drnnch 1 2pp 19tK)2 3'j7 3<1X 



Habitat) i 1 Ity 
tl"100LE,J n 
WRGA, 3 A 



Inspection reports. IF II ill lot i !"> d 



tlBiOQEQlHO Addl response to rtllrt request fni I 1 ? categories of Info r 
nucloivi reactor events t safety problems Forwards documents 
listed in App A Doc limn nt a In App n i amp lolo 1 <j withheld (ref 
FO1A Eionpt ion &1 

FEI.TPM. Jll Division of Rules and Ilotords (92/07/12 UDELL, R A 
Critical Kaaa Enn-rgy Project <?pp 1 Sf C.3 027 24X 

richo so-oon, na/Of 1 / in, 



E.21000QI37 Fiij staiwot 1 c a-aoi iinunfc of licetisos per f ornatics notes re 
facility avjlufltion Fur 1?BO 

HFIC - Mo Detailed Affiliation Gl ^on QO/12/31 7pp 

19ftft7 350 HflX Piths &0 -000< B2/O//13.liaiOO[]OOI3 

0310070007 noopard3 to FCIIA reqjuelt for elghl Cdtegarles of records 
steam gonorators t itonra tui-hlnos App A ilocumenti provided 
In il Udfftl miA f)eq,uBot l-,n^ Porwardi documtnts lifted In 
ftpp D 

FBI. TON, J M Dlviaian uf HiiUv anil Flecnrda BJ/OR/ 1O LOMO, D J 
Hlnthroii, JUinann. Putnam T- Itoborts ^pn 1 3M5 Oil S^IX 
richa 50-000, 



EiSl0070ia 1 ? Forward* tabulated tlatii on it^am atnsrator Inep (c mnlnt al 
facllitle Data ihoultf bo pru-vidod to L I EJ iis-oas 
IPPQLITH', r Doofatino lleactoi-B ftititssnient Branch B2/04/OI 
VARQA.S Dpsr-itlng lleactnra Branch 1 Spn 1S643 131 ?1X 



(5SI007O173 Forwards info r* *tnara ginerator Integrity & imps at all 
operating P lilts, par f5Q3PQ 1. SI irequDitB nctalli of inipt, 
including defect indlca t i om. tube plugging criteria t, tubes 
plugged will not be provUod nicept tor Point Iiach 1 
GOLLER.K n Divliton of Heactor Licning INFin-1979 onlyl 
yS/OSi'Bfl (IftCC/inr.R R Dlulnion of Technical navieu (MflR-1775 
onlij) 3pf 15MB 19A 31X ricdo 50-000, S2/OB/IO, B310070'0t>7 

8ai020007E3 Foruiarili itaam aonoratcr anon proaram fur 19D2 refueling^ 
maint outage 

Q'TOCLE.J D CommonuiBdltfi Clfllon Co B2/-OD/IB VAHGA- S A 
Littniing Branch 1, Hipp I37S3 179 31X F'ich* BO~B47.es/09/10, 
E3B 10200070 



on B20BOI-31 (, notice 



B210060024 Foruiardi IE Imp FlBpt 90-3 
of violation 

STAHOSTECK.il R Division of J-rojet t It*ild*nt Pragrtm* flB/09/17 
O'TaDLEjJ D Con*ollddtiid Ediion Co of Neu York Spp 19615 094 
S4X FitJiB 90-a47rQ3/0?/l7.S2100fi0024 



Bat0060041 Hottcs of violation from Imp on 020801-31 
* Division of Projact i Rut dent Projrann BSfOfft.7 
1S615 036 34X Ficha SO-347, 02/0 1 ?/ 17, 021 006003-4 



IP. 



BSI0060046 IE Imp Hup I BO-S47/B2-18 on B20S01-31 Nonccmp 1 1 ance notoil 
failur* ta mulntain con t*inn B ni intgritij for isolation 
valv* 

REDELOH5KI, T . KOLTftY. P , KIBTEn.H Dlvitlon of Projacfc t FleBtdent 
Progrann, 0E/0?/16 ISgtp ISilJ OS? H1X f ic ha 5O-B47. Ba/09/17, 



0208170233 IE l n fi> Motle 90-33, Buppl 1, "Lurking S. Di*lodoBil I-1S5 
Implant B*di " Bye lift ncl 

COBB.L I Dlviilon of Fu.l Fscilltiet, Kt.rlli it Bffuar i 
e2/10/04 <Ion*oU(Jjttd EdUon C(* at Ntw Vor* 66np 13761 SEO 

24X Fitlii 30~aOO.B2/10/06,fl20B1^0a33 



ftck fec.ipt of a20915 Itr informinj NJ?C of st 
correct violations noteJ in IE Inip Rept 5Q~247/B2-~1'I 
STAFiOsTECHI.R Division of Project Res.dont Progra 
O'TDDLE.J D CD,>,Dl3dat d d i s nn Co of N 8W V D r), J B 
24X FJche 50-347. 93/10/06, B210130536 



--E21013O559 Forwards response to (!"(. B20SI& Itr re violations 

IE Ir.sp Ropt SO-217/B2-J4 Corrective actions post-maint ' 

testsVlnsp per CDL-^1 wi 1 I be ensured All poat-mamt 
activities after 82I1Q1 mill be verified 

O'TOQLE.J Conso 1 itfated Edison Co of HPUI York 83/09/15 
ST^nOBTECKI . R Division of Project t. Resident Programs 1 c 
I5AQ3 3D5 24X Firhs 5O-347, 92/10/06, S2lO130-i56 



S31O2I&3OO PoruariJa IE Insp Ropt 50-347/62-19 
hone Qmp I i^nce rioted 

STftllOSTECKI, R Diviiion of Piojett >, Residt 

O'TaOLE.J Q Cansolldated Ed nan Co of Neu 
34X F-'iche 50-H'l/, D2/10/O7 , 8310210300 



890901 -30 No 



it Progiarr 



Vork 



2jip 



Bi/m/O? 
157(^1 24 



--B210360307 IE Insp Rept 5O-247/DS-19 on sao-?01-3O Mo noncomp] 
noted Hajor areas inapected licensee mgt changes, operatjona 
saFetij ven fication, plant tour* . operab 1 1 1 ty nf CSF.iafsty 
sys challenges A LEO follouiups 

nEDELOUSl^I.T . POLE*. T , KISTER.H Division of Project (.(I 
Programs B2/1O/O6 17pp 157i4 35O S4K Fiche 50-:M7, 
B2 102 1 0300 



OMH19023Q IE Bulletin 02-03, "Stress Conosian Crackino in fhnl- 
Wall, Large-Diameter. Stainless Steel, Flee ircu lation Sus 
Piping at Dtlll Plants " 3v t list end 

DEYOUN5.H C Director's Office. Office of Inspection and 
Enforcement B2/LO/H Consolidated Edison Co of New .nrl 

llSpp 15310 125 34X Fiehe 50-000, H2/10/ 14. Q20B190J1H 



S Rcportable oc c urrontes. LERs t related 



B31001000B Responds to FQIA request for 19 categories of dncuintnti n 
nuclear reactor events ( safety problems Forwards ilotumnnti 
listed in App A 

FELTQW. J M Oivislo-n o* flules and Records B3/Ob/2S UDH I . ft ft 
Critical Mass Energy Project I 5pp 15727 005 34X 
Ficho 50-OQO, B3/OA/3B.f!2iaOIQOQB 

--G01112067' Fnruardt reaponsa to request for determination of litvns 
bail* for reactor prosaure vessel t i onto inment tan cooler 
SIJE re FGflfi requi roments t/ current WRC criteria Licenses 
must perform thermal ft stress analysis at vessel 
LftlNAS. C Assistant Director for Safety Assessment 
CESENHUT.D DiviEio-n of Licensing 6p p 157^0 OflS 
Fiche 50~OOOra?/06/2a, 0210010008 



fiOl|2-4002fl Forwards Containment Sijs Qranch discutsion papir ctimnar 

facility -event ui/current licensing criteria 

RUCENBTEIH. 1. Assistant DirBttor for Core 8. Conta Inmeiil -iyste*! 
00/11/07 LAINAS.G Assistant Director for Safety Aisesimmt 
6pfi 15733 031 21K Fiche 5O-000, Q2/06/2B. paiOOlOOOH 

Q1O1090B 1 J4 ttetcrlbe^ sequence of events leading tn contalndisn t tic, 

at Unit 3 Unit 3 should be allowed to vsturn lo ogiuer 
operation ponding long-term actions IE Info Notice 80-07 r 
containment cooler laafci b press release end 

HOODS, H M Office of Inspection & Enforcement, Office of t li r 
Director BO/11/13 JORDAN, E L Office of Inspection! 
Enforcement, Olfice o* the Director 6pp 19720 033 aiic 

Fiche 50-000, aa/os,/aa. asiooioooa 

BI030903B? Informs that aafetu Program Evaluation Draneh dc-os not 

develop requkrvmrnta for non-RCS leakage detection Brant" 
evaluate* proposed req.uir*miin t adequacy in terms of 
cust-b enat I 6 anlij*li h possible adverse consequence! 
MURLEV, T E Division of 9afto Technology Ql/02/27 
etSEWIiUJT, D O Division of Licensing Spp 15720033 HX 
FUha 50-OOO. B3fQb/3&, B21001000B 

B2100BOOIS Aildl reaponse bo FDIA request for 19 categories of Info 
nuclear reactor vnts & safety problems, Forwards dotumtnti 
liitsd In App A Documents) in App B complately withheld (rtf 
raiA Etemptlan 9) 

FELTON.J M, Division of Ru|s nrf Rocords 62/07/12 UDElt . fl A 
Critical HMI Enirgi) Project 9pp 15663 037 S4X 
FIeh 50-OOO. ea/O7/12i821003001S 

BSOS030fil7 Foruardt "Enginaering Evaluation of Indian Point Un%* 

Flooding Event of 9OI017 " 

L^NHINO.M D DiT-ector'j Office 82/04/22 MICHELBOH. C 

Director's Office lp 13665239 24X Fiche 30-000, 02/07 fts 

82100B0015 

5205030617 "Englnetring Evaluation of Indian point Unit 2 Flooi*i, 

Event *f 801OI7 " 

LANNINO.W D. Director's Office 82/04/30 H3pp 19663 340. 

Ficht 50-OOO r e2/07/ia, 8210060019, 



DOCKETED ITEMS 



41 



e2]006t>:W6 Forwards LER B3-036/03L-0 
O'TOOLE.J D Consolidated Edison Co 
HAVKES.R C Region 1, Orflce of Dirt 
Fiche 50-347,82/09/34,6210060396 



of Neu York S3/09/24 
:tor lp 1S6IS 336 24X 



--B21OOS040O LER B2-036/03L-0 on S20B25. temporary change procedure 
authoTired to permit simultaneous operation under load af 
tuD diesel generators during surveillance test, potential ly 
reducing degree of redundancy Test procedure PTM-21 changed 
SMITH; 11 C Consolidated Edison Co of Neti Vork B3/09/24 
Region 1, Office of Director 2pp 15615 327 34X 
Fiche 50-247, B2/07/34, 6210060396 

52!QO7tJ3fil Forwards LER 82-O34/03L-0 

a'TQELE.J D Consolidated Edison Co of Neu York 82/09/27 
HAYNE5.R C Region 1, Office of Director lp 15634 04.0 24X 
Fiche 50-247. 82/09/27. B310070361 



DOCKET 30-249 DRESDEN NUCLEAR POWER STATION, UNIT 3 

F Security, medical, emergency & fire protection plans 

62Q9S90125 Releases public version of revlsad generating station 
emergency plan corporate command ctr emerge ncy plan 
imp tenanting procedure 

FeLTON.J.M Division Of Rules and Records 03/09/16 Document 

Management Branch lp 15564 122 SIX FUhe 50-000,83/09/16. 
0209290125 

B209390IB9 Forwards public version of Revision 4 to generating station 
emergency plan corporate command ctr Emergency Plan 
Implementing Procedure EQF-3, "Envi ron/Emergencu 
Coordinator " Receipt form end 

PAJOUBKI.J E Commonwealth Edison Co 02/09/01 EENTON, H R NRC 
- No Detailed Affiliation Oiven lp 13364 133 24X 
Fiche 50-000, B2/09/IE., B2Q < ?29012S 



-82JOO7036S) LER 02-031/03L-0 on B20S2B. during normal operation , charg ing 
pump 22 developed leak & uas declared inoperable Caused by 
defective gasket on cylinder head A Gasket replaced t< pump 
returned tn ivc 

' Consolidated Edison Co of Neu York B2/09/27 Region I, 

Office of Director lp 15634 061 24X Fiche 50-247,82/09/27, 
S3 10070361 



0209290225 Public version of Revision 4 to generating station 
emergency plan corporate command ctr emergency Man 
Implementing Procedure EDF-3, "Environ/EmergenCYl 
Coordinator " 

PAJOUSKI.J E , LITEnBHI.L A , FLESSNER, S A Commonwealth Edison 
Co B2/08/3I Upp 15564 134 SAX Fiche SO-000, B2/09/1 6, 
8209390129 



C31001O14I Forwards LER B2-033/O1T-0 

O'TOOLtt.J D Consolidated Edison Co of Haul Yorfc (32/09/20 
HAVNCS. R C Region 1, Office of Director lp 15583 080 24X 

Fiche 50-247, B2/09/3B, 8310Q.1014 I 

--S21004Q145 LER B3-032/01T-0 on 020817, b loud ouin outer isolation valve 
FCV B2I5A failed closed due to failure of solenoid valve 
EOV L3I5A Caused bv open circuit In pilot solenoid valve 
SOV 1315A coil Coil replaced 

FITZPATRICK, B Consol I da ted Edison Co of Neu York B2/OB/31 
Region I, Office of Director 3pp 15503 OB9 24X 
Fiehe 50-347.02/09/33,8210040141 



Forwards LER B2-035/03L-0 
O'TOQLE.J B Consolidated EdnOn Co of New York 82/07/28 
HAVNES.R C Region 1. Office of Director lp 156BO 241 24X 
Fiche 50-347. 02/09/28, B210I304I 1 



-U210J30419 LER 92-035/O3L-0 on B20029, nuc loar paiuer range 
I n Iruurenta t ion channel Nil became inoperative due to 
failure of power supply unit Cause of unit Failure not 
stated Defective high voltage power supply removed 
(JADIPURAh.P Consolidated Edison Co of Neu York B2/09/2B 
Region 1. Office of Director lp 196BO 2-12 24X 
Fichfr 30-247,62/09/29,3210130411 



2 1 0-290267 Pdrt 21 deficiency rept re potential galling problem 
stem & bonn-et of 1 35-inch Ji larger A105 carbon itsel & 
AIB3-F22 valves supplied Feb 1991-Aug 19B2 Valves should be 
service* & stem Ii/or bontiat replaced 

JBAGELLE.L & Convdl, !nc B3/IO/11 HAYNE3, R C Reoion It 
of Director 17pp 1 5854 232 24X Fiche 50-000, 82/1O/1 1, 

8210290267 



8210250145 Forwards LER G2-039/03L-0 

D'TDDUe.J D Coniolidated Edi.on Co of Ne 
HAYIJES.R C Region It Office of Director 
FicJie 50-247,02/10/12,9210350143 



i York 9B/IO/12 
lp 15797 334 2-1X 



8210250149 LER 03-039/03L-0 on 020910. chemi cal sampling indicated 
13 15'/, concentration of boric acid in storage tank 22 Boric 
acid transfer pump also out of svc for malnt Cause not 
stated Contonti diluted 

HrfjniCHS,0 Consolidated Edison Co of Neu Yort 82/10/13 
Region 1, Office at Director lp 157B7 395 Z4X 
Fiche 50-247, B2/IO/ 12, B2I0230145 



T H-earino transcripts on non-ant i trui t matters 



8210010009 Forwards info to suppl B20701 request fur exempt ion From Apn 
R per 020917 telcon Request applies to Sections III O 3 a 
& III 3 b re installation of fire suppression sus 
RAU8CH, T J CommnniUBalth Edison Co 82/09/23 EISENHUT.D 
Division of Licensing 0pp 15565 152 24X FiUie 50-000.02/09/23, 
8310010009 

2210130376 Advises that Installation of offaite dn9(r calculation SIJB 
program fully operational tracking model tc operational 
A-model uill be deUgad until 821331 to complete prime 
computer installation 

SUARTZ.E D Commonwealth Edison Co 82/10/06 DENTdN, H R OF fit. 9 
of Nuclear Reactor Regulation, Director 2pp 13602 09B 24X 
Fiche 30-000, B2/10/OA, 8310130376 

0310390047 Releases puilic version of ravlslons to Quad Cities. Zion 
i, Dresden emergency plan anneies tc revneil generating 
station emergency plan telephone directory 

PEL TON. J H Division of Rulei and Records 93/10/00 Document 

Management Branch lp 15S77 313 24X Fiche 50-000,02/10/00, 
8210390047 

Q2102900AO Foruiards public version of Revision 3 to Quad Cities b 2 1 on 
emergency plan ann*", Revision S to Dresden emergency plan 
annei, fievls Ion to Byron emergency plan annei fe revised 
generating station emergency plan telephone directory 
MOORE, R D CommonuF&alth Ellison Co 03/07/30 DENTDN, H R NRC - 
No Detailed Affiliation Given 9pp 15077 314 24K 
Fiche 50-000, 82/10/OB, B310290047 

0210290077 Public version of Revision 3 to Quad Cities t- Zion 
emergency plan anneies, Revl si on 3 to Dresden emergency plan 
nne< t Revision to Byron emergency plan annex 
* Commonuealth Erf 1 a on Co Q3/06/30 lOZpp 13877 319 24 X 
Fiche 50-000, B2/10/OHI 8310290047 

82102906BB Public version of revised generating otation emergency plan 
telephone directory 

OALLEiD P Commonuealth Edison Co, B2/OB/12 43pp 18878,318 
34X Fiche 30-OQQi B2/IO/00, 9210390047 

8210220359 Provides Info re organiiatlon d performance of depti 
rtsponilbl* for radiation protection activi tin, per 030702 
commitment Training coordinator aiiiflned in Apr 1903 to 
improve health physics training programs, 

TRAMM.TR Commonuoalth Edison Co S2/10/14 DENTDN. H R Office 
of Nuclear Reactor Regulation. Director ?pp 15776 297 84X 
Fiche SO-000, 82/10/14tB2103203S9 



6210060233 Testimony of JD O'Taole bafore US House of Representative* 
Subcommittee on Energy t- Conservation of Committee on 
Energy % Commerce re role of put lie participation in NRC 
proceeding-* W/Certif icate of Svc Related correspondence 
O'TOOLE.J D Consolidated Edlion Co of Neu York 83/10/01 Slpp 
15621 204 S4X Fiche 30-247, B3/10/01 , S3I0060232 



8210290170 Ad vim that plans t preparedneii for offilt* protection 
near facility adequate d ulll be applied in event of 
radiological emergency IL State ( local plans approved subj 
to verification of adequacy of alerting 1 notification sys 
THOMAS, L M Federal Fmirgency Hanigimant Agency 83/10/14 
DIRCKS, W J Office of the Executive Director for Operation* lp 
13700:803 24X Flcha 30-010- 82/10/U, B310250170, 



Ad judi calory correspondent:* 



0B10010257 DecUion ALAB-W5 affirmlno LBP-fll-37 !< LDP-BZ-tS, 
functioning mod to OL for Unit 3 to permit installation of 
five high dimity spent fuel ctorage racks tc authorizing 
t*iu*nc* at amtnd* to OLi ^respectively. 

TOMPKINS, B A Atomic Safety and Licensing Appeal Panel 82/09/29. 
2pp 13571,054 24 X Flche^ 30-237, 92/09/39r 0810010257 



DOCKETED ITEMS 



P Operating licenie itase documents. * corrtspondano 

6210080001 Advises that hoard notification issued on BSO?03 re USB of 
auxiliary overhead crane rather than min, overhead cr*n to 
move. spent fuel pool racks. should have bren issued in/Number 

BK-8s-?-2 

HIRftOLIA.F Assistant Director for Safety Assessment aa/09/M 
Atomic Safety and Licensing Board Panel 4pp ISfifiB 341 2-tX 
Flche 5Q-S37. 82/07-/14. 8210090001 

B21QOBOQQE Board Notification 33-13 Informs at ufrll failure to tarry 

out fuel pool rack removal t> installation in manner 
described in testimony at hearings Auiiliary overhead crane 
used Instaaif of ridimdant main overhead crane 

rpPOLITO,T A Assistant Director for Safaty AiiBSsment 82/07/03 
Atomic Safety and Licensing Boaril Panel Spp 1S460 34 S 24X 
Rich* 50-237rB2/09/14,92100B0001 

B2092103B3 RBcommendu board notification TI utll use of aunliary crane 

inltead of main redundant crane to initall fuel racks. < 
4 > tented! in testimony hefor ASLB Licensee hi cormnittld to 
follou testimony in computing remaining wort, 

IPPOLITD, T A Assistant Director for Safety A*tessinnt B2V09/03 
EISENHUT,D Division of Licensing app 1566B 349 24X 



6210120105 Recasts delay of Imp 1 ementttan due date* ra NUREQ-0737, 
items tl D 3. "Plant Shielding," II D 3, 'Post-rtccia'tnt 
Sampling" & II F L 1, "Noble 0*s Effluent Monitor " 
SUAHTZ.E D CoiMfionuiealth Edison Co B2/10/04 EISENHUT.D 
Division of Licensing 5pp 1 5&51 237 34* riclie 30-000.88/10/04, 
6210120105 



Forwards Revision 3 of Chapter 1 at "Off lite Dote 
Calculation Manual " 

GOUDEttp J C Commoniusilth Edison Co 82/10/06 CASE, G Office of 
Nuclear Reactor Regulation. Director 2op 15B05 137 24X 
Ftche 50-000- 62/10/06,6310360526 

EJ2l02t0542 Revision 3 of Chapter 9 of "OffiiU Don Calculation 
Manual " 

Coffunonkunalth Edison do 62/09/30 S3pp 15805 139 24X 
Flche 50-000, B2V10/06. 9210260Sai 



Provide* *<U1 guldjnci k clarification re 620606 muoit 
for addS info PUT NUREO-0737, It em II H 3, "Poit-rtct irfent 
Sampling 3ijt " DstJile-I rellabilltg idalutit not required 
bo latisfv NIIC concerns 
CRUTCHFIELD. D Qpefating Rtactari Branch 9 BS/10/OH DELOEQROE,L 

Commonumltft Edison Cn 3pp IS720 004 24X Ffclra 50-000. 
BS/ ia/OB, 8210 18OQ5V. 

9210190630 Foruardt aftu evaluation af Uciiue* G304I4 t, 0611 
Tfrsponits to NUHEO-0737. Item II E 4 S. "Purgi/Vini Valve 
Itolation 0*9 mdabilLtg " Rnpotim accijitablt Topic 
reviiu complfttd 

CRUTCHPIELD. D Operating Ractori Branch 5 B2/10/I3 uELQEQHOE, U 
CammonuBalth Ed i f on CD Spp 1873B- 1T2 34X FUJie- SO-S37, 



Q3101?0445 Foruiardi lupplvraental reiaani* to Ocneric Utr B2-05 re 
impUmantation itatul of MUREff-0737- I tms II D 3,11 F 1 3, 
II F t, 3, II F I 5 ti It F 1 A, In. mtponit to 321006 no.uBit 
SMART!. E D Common toe a 1th Ediion Co 53/10/14, EISEKHUT, D 
Qlvlliati or Llctniing 5pp 1S741 203. 24X Flch* 90-0-00,82/10/14, 
9210170449 

9E10S20333 Forward* Info re NUP.EO-0737, Item 1 1 D t. "Performance 
Tutini of BWR Bafatij/RellBf V*lvei r " per 830727 requeit, 
Info: adeD.uifca!y Jsraom tm t appljcabl 1 ity of riiulti op EWfl 
ouncrc group genJflc t*tt rftpt NEDE-S49B9-P to facility 
EUARTZ.e D Cominoiiuj.jltfi Edtion Co. 82/10/13 EIBENHUT, D 0, 
Civilian of Licaniing I7pp 13776 Oil 24 1! Flche 50-837, 83/10/19, 
9210220335 

Bai0asdi55 Foruipdi curraclio^i to propond Tach Spie P*s*i 1,2/2,2-1 b 
3 3/4- 3-5,. fupportinj rtvUu of futurt riloadi t r-avind 
Flgui-a 3 B liBhtet lr providing eKt*n<f*.<i MflPLHOR vt ei|ioiur 
CUTVI for barrir led ttit nimbly fuel 

RiWSCH, T J Cvnnonuaalth Edi*on Co fi3/tO/lQ DENTON, H R Office 
af Nuclear Reactor Rcoulatlan. Dinctor |i|i 13703,333 S4X 
Fl ch- SO-OOOr fla/IO/lfl- 9210350193 

--aa 10290(77 Errata h Addvnda Sheet B.rtpliEtrf Ptat 4-10 to "LOCA 
Analyili Rept for Dr**dan Unit* 8131 Quad Cltiti 1 !< 2 
Nuclear Poutr Statlcni " 

* Oerral eitttrie Co NEDu-B414aA ERR OB. 82/09/30 3pp, 
157BB-S3?, B4X FUha. SO-COO, 82/ 10/16,8810890139 



921025006'? Provides addl info re reactor unter claanup room arsa * <r ' 
monitors Temp element* nauie no automatic plant response 
beyond control room alarms 

RAUSCH.T J Commonuealth Edison Co 52/10/19 EISENHUT.T) 
Division of Licensing 2pp 1 57S7 OBI 24X Fiche SO-000. [!?/ 10V H 
8210250069 

5210860296 Foriiiardi iafty evaluation of BHFI ouitiors jroup jantrl' 1 
response to NUFIEO-0737. I tern II K 3 25. "Effect of LDI of 
AC Powtr on Pump Seals " No mod to seal cooling for 
r trcolat ion pump raqulred Item resolvfld 
CRUTCHF1ELD, D Operating Ruactora Qranch 3 BH/10/21 [)CI(JH>"-.L 

Commonuealth Edison Co 7pp 15303 01B 24X FUhe 50~J7i 
B3/IO/21. 52102602^6 

InspFttion report*. IE Bulletins (. corrBapondei.ee 

621006032'' Forwards IE Insp Repts 50-O10/B2-02, 50-237/C12-C-1 (. 
50-217/62-03 on 020119-0210 No nont omp 1 lane a noted. 
LITTLE, M S Dlviiian of Engineering & Technical Programs UJ'GJVj" 

BEED.C ConmonUBalth Edison Co 2pp 15M5 331 2*K 
Flehe 50-010,82/09/32,13310060329 

8SJ0060335 IE Imp Ropts 50-010/82-02,50-337/112-03 t 30 3-TmlJ C'l i> 
620119-0218 No noncomp 1 iance noted MQJOT aruaa lnt[-ect*il 
open ! unreiolvad items t item* of noncomp 1 lance it 
integrated le* rats test 

REIMANNiF W negion 3, Office Df Director JACKIW. 1 Ol*l*i-. 
of Engineering b Technical Programs aa/Qf/31 ipp 
SIX Fiche SO-OJO. 03/09/23. 3310060339 



B2101S05B3 Forward! IE In>p Repts 50-010/82-1 3, 5Q-!j;i7/lia 
30-a49/Ba-lB On B2Q7QB-QB09 ti notice of violation 
STREETER.J F Division of Project V Resident Programs 
REEO.C Commonualth Edison Co 2pp 15713099 2*X 
Ftcbt iO-OlO, 8S/O9/3B, 0S1 01 30323 



B210150530 Notice of violation from imp on B30700~Otll)V 

BTflEEIER. J F Division of Project I- RaaidBtit Program tV'CK 
(p 15713 101 SIX Fich. 50-010, 82/09/33. Ba!Ql!10Bi!'t 

Bal01S053H IE Imp Ropts 50-010/82-13,50-237/02-17 f, 10 a*<Jm.' II 

62070B-OB09 Nnntomp 1 lance noted failure to ittui * perform 

*ir preiiure tett procedure 

TONOUE, T M , JORDAN, H J , WALKER -R D Division of l'rtlj*cl I, 

Rtsiifent Projram B2/07/HB Qpp 19713 10B J4X 

Fitht 50-010,62/09/29, B21 01 50523 

6210060359 Ac k receipt, of 820910 Itr informing Nile of tpi 1*1 t" t 
correct violations noted in IE Insp flepts 50-237/Hl' :\'l. 
30-249/81-32, 50-3S4/BI-23. 50-365/B1-23. SO-295/fll~'ll t 
50-304/91-29 

SPES3ARD, R L Division nf Projoct tt notidont Progrjim 
ftEEDiC ComnonuiBaltfi Ed I tan Co Ip OAIO .134 lt*K 
Fkhfl 30-000, B2/IO/OI.B2J0060339 



0310060367 Responds to NHC 6207 12 I tr r vlalatlont nnU4 in U 
Repts 50-837/61-39,30-249/81-32, 50-294/81-23, 30-af,1/||| a | 
SO-293/B1-31 l> 50-304/81-29 Corrective ctlonl Lraininj) r^t 
mgt prloTltli re plant availability uill hi tOndtjtm 
ftEEO.C CommoniuejrUh Eittian Co B2/09/10 KCfTIIH.,! fj a, 
3. Office of Director 13pp 19610 395 94X 
Flche 30-000, B2/IO/01, 921006035-7 



6210080178 Foru*rd* listing of piping sui which fall to i tfj*t 

requiramentt. or KRC BOOB1B confirmatory action Itr lh 
Bulletin 79-14 operabllity evaluation update* ul 1 I nol ^i 
provided for Dretdan & Quad Cities Final update by Ott i"Jdj 
BAUBCN. T J Comnonuiealth Ediion Co 82/10/01 KIPI'IIR j c 
3, Offic. f Dirrctor 6pp 15640 159 H4X Flche flri CK,i, lyjtt 
BZ100SOI78 



B21O150539 Forward! IE Inp R*pti 30-010/63-13, 

30-24^/62-ao on BSOB30-0903 No noncomp 1 lane t no tad 
PAPERIEULO.C J Division of Emtrgency Preparedntti U 
Support aS/10/01. REEDiC, Commonuiealth Edltan Co 
IS7U.179 34X Ficha. 30-010.82/10/01,881013033'? 



8210150543 IE Insp Rpts 30-010/02-19, 50-337/flS-l) I. M) a*. 
820830-0903 ti 0? No noncomp 1 i anc nattd rlajor arrii 
ln-sp*ctid confirmatory m*aiyr*mnt programrQC pr|f* n 
analytical measurementl ti environ monitoring progrtN 
SCHUMACHER, M C , NICHOLSON, M A , JANUBKA, A Dlvll|i 
Emergency Pr(pndn*ss tc Dprt(onl Qupport 
15714-177. 24X Fiche 50-010,02/10/01,88101005^9 



82100B0190 Confirm* 821103 enforcitnent confarine* t 
aspects atmc iatd u/pracurafnmt, Initallatlon L ITS* of 
nan-qualiritd valvi guldis in > lictromagnet Ic rtllll v 
t cilHiis. 

8PES3ARD, R. L. Division of Project b Rlltdint Pro(rj t 
REED.C, CDnmonuaalth Edlion Co Ip 19640:101, SU 
Fich. 30-000, 82/10/04, 9810080190 



DOCKETED ITEMS 



43 



Notice BO-35, Suppl 1, "Loading t Dislodged 1-125 
vc list end 
sion of Fuel Facilities, Materials & Safeguards 

of New Ynrk 66pp 15761 350 



IE Inf 

tmpljnt Seeds " 
COBBi L I Divi 

32/10/06 Consolidated Edison C 

24* Fiche 5O-oaO.B2/IO/O4,S2Gai9O233 



S2GB19023B IE Bulletin B3-03, "Stress Corrosion Cracking in Thiclr- 
Uall. Large-Diameter. Stainless 5tee I, floe irru lation Sys 
Piping at BUR Plants " Svc list end 

DEVaUHO.H C Director's Office. Office of Inspection and 
Enforcement B3/10/H Consolidated Edison Co of Neui Vor fc 

I15pp 15910 135 SIX Fiche 50-000. 82/ 10/ I 4, B20819023B 



8210130197 Forwards LER 82-034/03L-0 

SCOTT.D J Commonwealth Edison Co 82/09/28 KEPPLER! J O Region 
3, Office of Director Ip 13&74 117 24 X Ficfie 30-249,83/09/38! 
8210130197 

9210130201 LER B2-Q34/03L-O on 330901. investigation revealed that 
substandard electromatic relief valv* main valve disc guide 
sleav* utilized on ERV 3~2O3-3C Causerf bij personnel error in 
ordering sleeve Sleeve mill be replaced 

HOLLAND.? Commonwealth Edison Co B2/09/B8 Rogion 3, Office 

of Director 2pp 19674 110 34X Fiche 3O-249. ea/09/EB, 
8210130197 



i-odic operating reports & related 



spondence 



6^10180097 Foruards monthly operating repts for Sept 19H2 

SCOTT.D J Commonwealth Edison Co 83/10/01 Director's Offin 

Office of Inspection and Enforcement Ip 1371B 001 34 X 
Fich< 50-01O. 83/10/01. 8310180097 



821O180100 Monthly operating repts for Sept 1982 

SCHROEDER.D A Cnmiionuea 1 th Edison Co B3/1O/OI 
1371FJ 002 24X Fichu 5O-OIO, B2/10/01, B2101B0097 



22pp 



B3101904S9 Forwards LEO 83-036/O3L-0 

SCQTT.D J Commonwealth Edison Co B2/10/05 KEPPLER. JO Region 
3. Office of Director Ip 15735 319 24X Fiche 30-249,83/10/03. 
Q210I904SB 

8210190471 LER 83-03&/03L-0 on 920912, dur in g startup 6 4SX p QUIBT. 
annunciator 903-5-N-4 Indicated turbine pressure operator 
load rejection d turbine stop valve icrimi bypassed on one 
subchannel of Channel A half tcram circuitry 

TURNQUESTiL Cofnmonuiaa 1 th Ed I ton Co 33/10/05 Reoinn 3. 

Office of Director 2pp 1573S 32O 24 X Fiche 50-249,02/10/05, 
S21019049B 



Reportahle occurrences, LERs t. related correspondenct 



6210150097 Forwards LER 81-026/03L-0 

SCOTT.D J Commonwealth Ellison Co B1/1O/13 
3, Chicago. Office of the Director (01/03/01) 
Fiche 50-249, Bl /1O/13, B210! 50097 



KEPPLER. J Region 
Ip 15701 103 34X 



B21Q1501OZ LER 8I-026/03L-0 on B10915, uhl 1 e shutting doum, rod P-IQ 
itiouEd uirong position on rod worth mlnimiier Caused by 
several diode Failures on tuo digital output printed circuit 
boards Boards removed, repaired k tested satisfactorily 
SCHnaEDEII.fi Cammonuealth Edison Co 01/09/29 Region 3. 

Chicago. Office of the Director (81/03/01) Spp 1B7O1 1B3 24X 
Fich* 50-349,81/10/13,0310150097 



B21O37025I Foruarils LER Sl-040/on~0 

ECOTT.D J Commonuealth Edison Co 81/12/15 
3. Chicago, Office of the Director (Bl/03/01 I 
Ficne SO-249-, E1/L2/1S 1 821037029! 



KEPPLER.J Q Region 

Ip 15B29 233 24 X 



B3lO27035fl LER B1-04Q/01T-0 on 811301, when R< pressure decreased to 
32 pttg.rod N-9 notched from position 03 to 04 & then to 
position 06 Cause unknown Uoi-k request issued to check 
single notch control auitch during next refueling outage 
SCHROEDER.B A Commonwealth Ediion Co Bl/12/07 Region P. 

Chicago. Office nf the Director (S1/O3/01) 3pp 15S29 234 S-JX 
Fiche 5O-249. Bl/12/15, 8210270251 



Forward* LER B2-035/03L-O 
SCOTT.D J Coramonuealth Edison Co B2/Q9/ 14 KEPPLER.J Region 
3. OfPue of DiTBctor Ip 155SI 307 24X Fiche SO-249, B3/09/I6, 
B2 10010 126 

0310010137 LER ea-03S/03L-0 on 820905, during testing of control rod 

drive H-4 for pvertrave 1, overtravel alarm came up fc position 

Indication loit, ind icat ing uncoupling of control blade from 

drive Probably caused by Inner filter becoming detached 

MHALEIJ, H Commonuealth Edison Co B2/09/1A Region 3, Office 

of Director 2pp 1S3S1 208 24 X Fiche 30-349, B2/09/lfii 

6210040136 

B2102S030& Forwards updated LER 82-029/01X-1 

SCOTT. D J Commonuealth Ediion Co B3/09/22 KEPPLER, J Region 
3, Office of Director Ip 13791 030 24X Fiche, 50-B49, B3/09/H2, 
B31O330306 

--B2102S0316 Updated LER B2-029/01X-1 on 6207 12, magnetrol iiuJtche* 82C t. 
82D did not trip uihen tested for proper tripping upon uater 
loading Cauie not in own Visual Imp, revl eui ti weekly tilting 
revealed no abnormalities Vendor revlaiu end, 

VWALEN, R Cominonuealtn Edison Co 82/09/SS, Region 3, Office 

of Director 3pp 13791 039 24X Fiche SO-249, 82/09/82, 
8310250306 

S3 102 50328 Forward* updated LER B2-023/01X-1 

SCOTT, D J C omnia nuea 1th Edison Co 82/09/23 KEPPLER.J & Rvgion 
3. Office of Director Ip 15790 OSS 24X Fiche SO-249, B2/09/B2, 
82 102S032B 

B2102S034B Updated LER 82-023/01X-1 on B203IO, no loui pouer range 

monitor input to rod block monitor (ROM) notid during OOP 

700-E3 Caused fru shorted steering diodes on several RBM 

cards Defective diodes replaced 

MORGAN, W Commonwealth Edison Co 02/09/22 Region 3. Office 

of Director, 2pp 15790083 84X Fiche 50-249, B2/0 9/22, 

821O25O328 



8210190403 Forwards LER 92-037 /O3L-0 

SCOTT, D J Commonuealth Ed it on Co BE/1 0/04 KEPPLER.J Q Region 
3, Office of Director Ip 15740 33i 2lX Fiche SO-249, B3/ 1O/O6, 
B210190403 

0210190412 LER B2-Q37/03L-O on 020922, trana 1 ant in-tore probe ball 
valve 3E mould not reclose Caused by IDS* of tension in 
high tension spring in drive m&chanlim Valve closed t< spring 
retenlioned 

MOROAM.W Commonuealth Ediion Co 82/1O/Q6 Region 3, OPficn 

of Director 2pp 1574O 397 SIX Fiche 50-249, B2/10/Oi, 
B21 0190403 



DOCKET 50-250 TURKEY POINT PLANT, UNIT 3 

F Security medical, emergency & Fire protection plans 

0209170062 Foruiards Revision 6 to physical security plan Revision 
uilthhild (ref 10CFR73 21) 

UHRIO.R.E Florida Power & Lioht Co B2/09/OB EISENKUT. D O 
Division of HcTHing 2pp 14910 Oi9 24X Fiche 30-250,82/09/03. 
02O91700&2 

8210190179 Releases public veriion of emergency plan implementing 
procedure 

FELTON.J M Division of Ruin and Records 92/09/30, Document 

Management Branch Ip 1575B 06-2 24X Fiche 50-250, 32/07/30, 
8210190170 

B2101901S6 Foruards public version of Emergency Plan ImplementinD 
Procedures 20104. "Emergency Roster, " aolOl, "Duties of 
Emergniy Coordinator," 2O1O7. "Fir e/Eplqi ion EirBrotnc iee" 
% 20127 "Dutle* of Assembly Area Supervisor " 

UHRIOiR E Florida Power (c Light Co, B2/&7/24 O'HEILLy, J P. 
Region 2, Office Of Director Ip. 1373B.Q63, 24 X 
Ficht 50-250,02/09/30, B210190I7S 

8210190194 Public version of Emergency Plan Implementing Procedures 
30101, "Dutiei of Emergency Coordinator," 20104, "Eflroencu 
Rosten " 20107. "Fire/Exp loi on Emergencies" & 20127, "Dutle i 
of Assembly Area Superviior " 

Florida Pouer & Light Co 62/09/14 50pp 19739:064 H4X 
Fiche 30-230,82/09/30, S21Ol?017a 

S210190440 Extend.* Invitation to obterv* 021019 dtmonstr*tlon of 
emBrgeney response sys at Technology for Energy 
CorpiKnoivllle.TN 

UHRTO.R E Florid* Pouier S. Light Co, 83/10/12 EISEMHUT. O, O. 
Division of Licensing Ip 1974I:1B&. 24 X Fiche 30-OOO. B2/ 10/12, 
9310190440 

3210330244 Foruards revision! to physical security plan. Revisions 
withheld (ref 10CFR73 21 

KAMMER.D.B Tennessee Valley Authority BS/10/19 DENT DM, H f! 
Office of Nuclear Reactor Regulation. Director, Ip 13769,343, 24 X 
Fiche SO-B30, B2/10/19, 8810230244 

0210280S91 Foruards Revision 1 to lOCFRSOApp R fire protection revlciu 
Revision corrects tupographlca.1 rrorc In 820701 submlttal 
UHRIOiR E, Florida Pouer b Light Co 83/10/32 EISENHUT. 0, O 
Division of Licensing, Ip ISSBB'OBO, S4X Fiche- 30-2BO, B2/ 10/H3, 
8210280271. 



DOCKETED ITEMS 



3210230293 Revision 1 to 10CFR50 App R firs protection rtvicu 

* FBorldi Power 1 Light Co 02/10/23 63j>j> 15039 OBI 24X 
Fiel*B 50-250,62/10/22, 8210380391 

P Operating license stage document! & correspondence 

9210070007 Responds to FOIA renuut for tight tstejories at retards re 
steam generator! tt ttntti turbines App A, documents provided 
in R Udell FOIA Request 91-313 Farmsrds dacumintt li*t*d in 
App B 

PEL TOW, J rt Diviilon of Rules and Rstords BB/08/JO LONO, D J 
Winthrop, Stimiom Putnam & Roberts 9pp 1 5443 063 3-fX 
Flehe 30-000, 82/08/10. 8210070007 

B3JOI30&21 Summary of itt Interview full tuning 820713-15 audit of 
pre*suri i ed thermal shock in-plant training programi d 
opt rating pracsdura* 

CROTEI-JHUIS, M Operating React or t Brancn 1 02/09/15 Operating 

RtacEOr* Branch 1 5pp J5672 3*1 24 X Flche 50-250. B2/09/ IS, 
6210130621 

B2102B0013 Responds to FOIA requeit for all i nterna I j non-pub I It 
documeti ti i nemos. evaluation rept* i other matl dealing m/ 
nuclear plant operations Forwards document! lilted In App tt 
FeLTON.J M Diviiion of flules and Record* B3/Q9/17 flCINNIS.* 
IJtui t, dburver flpp ISfiiO 045 24K Fit JIB 30-000, 83/07/1 7. 
8210200013 

820B310034 Forwards draft Info notice re deficiencies in *ir filtration 

fc ventilation iys Notice b*ee! on radioactive r.ain relt-ao 
at Pilgrim 1 fc on four r*latd *v>nt* at other plants 
involving deficiencies in jnalnt & tistlng of Filter lui 
MATT80N, R J Dlvlilon of System* Integration (pott 81 1003 J 
BS/Oa/OS JOHDAN.E. L Division of Enginttrlng & duality 
AtUTanc. 3pp ISB61.034 24X Flche 50-000.63/09/17,8210330013 

&2t02BOlOO Notlfiti that on 920224, Aldirtan adviiid that rapt tant r 

pot ilb IB uilllPul violation of nporting T nuir^minti & 
f*liif Icatlan of OA & guard quallf leation rtcord* it 

63/03^01 Offie* at 

lcho 50-000, B2/09/1 7. 



E OfMc* of Importer J. Aurfitop 
Insjuctor b Auditor lp 19861 037 SIX 
B2102B0013 



62100SOSS9 Rnut luhmittal of f*ei for BSObOt, rv^uait for Ttch Spec 
ctiangtt r* dagradld grid voltag* 4 S30B10 nqueit for 
appro vi I of mod* to turbine runback |.y* 

DIOOB,ft M 4.ic*n* Fit Hjn*atm*nt Branch 32/DY/23 UHRIO. R, E 
Fieri if* Paw.r tt LJ)ht Co lp I3fr6 2W 2fl)l Fteh* 30-230, 
02/09/23,5210050509 



3210370353 Fq-rwarili util 621012 I tr containing paijmint of LlCinu ttf 
ft* r> r-cdundancij in RHR iijs rcquotcd in NRC B20B16 t tr 
UHRIOiR E Florida Power & Light Co 82/10/21 DIGGB, H M List,, 
F*t Manqiinent Branch lp 1 5B28 279 24X Fiche 50-330. BJ/ 10/91. 
8210270253 



Inipctiun report*. IE Uulltin* tt e oireapnndeni: e 



B21007Q007 Sepond> to FDIA request for eight categories of TitorAt 
steim gntraton d iteajn turbines App A documnnts pravidtd 
in R Udell FDIA Requagt 31-313 Forwards documents liit*d In 
App B 

FELTON. J H Division of Rule* and Records 82/09/10 LONO, D J 
Mlnthrop, Btimion, Putnam * Roberts 9pp 15645 Oi3 3*31 
Flctif 5O-000. 92/08/10,8310070007 



B2 10070 139 Forward! tabulated data on steam generator 
facilltla* Dti should tin provided to licensee* 
IPPOLITO^T Operating Reacton Aiiesment Branch 
VAROA, 9 Operating Reactors Branch 1 3pp 19643 
FIchB SO-OOO, 82/OB/IO, 8210070007 



B210070172 Fo-ruiarda info re iteam gEneratnr integrity t iniji *l Jl 

operJtlns PURt-ptr 730320 t, 21 requests Details of lntpi> 
including defect Indici t ions, tube plugginu criteria 4 tubri. 
plugged ul I 1 not bo provitfid eicept for Point Beach 1 
HOLLER, K R Division of Reactor Licensing <NRR-]v73 onlyl 
73/03/24 MrtCCARY.R R Division of Technical Revliu (lfflR-1^^5 
onli;) 5pp 13645 194 24X Flche 50-000, B2/OB/IO, QBI0070007 

B2100103(6 Ack receipt oF 9^0B35 Itr informing NHC of ittpi takin tt 
corrct violation* noted in IE Insp flspt* 50-350/02-21 tc 
50-231/82-24 

DANCE, H C Division of Prqject ! Resident Projrams OZ/09/13 
UHRIO, K E Florida Power & Light Co lp 19568 &24 ;MX 
Flche 30-350, 82/09/13, B21Q010316 

9210010321 Retponds to NRG 820736 Itr r* violation! nat*d In It l*i 

Repti 50-2SO/Ba-24 (c 50-351/B2-24 Corrective action* plant 
manager dlicutteil need for Increased control of activLltil 
affecting fire barrinr penetrations ui/const personnal 
UHHIO.R E Florida Power (< Light Co B2/Oa/S3 Q'ncllLV. J P 
Region S. Office of Director 3pp 13968 223 34 K 
Fiche 5O-25 



82100103S? Forwards IE Inap Rejjta 50-250/BH-2' t. aO-2Bl/OB M4 an 
aaOSSi-OiSS t< notice of violation 

LEWIS, R C Division of Project & Resident Program* DJ/07/Jt 
UHRIO.fi E, Florida Power t, Light Co 2pp 13560 330 Bit 
Flcht 50-230, 63/09/13, 8210010316 



eat0010B.?B Forunrdi rspon* to NfiC 930219 Itr pgiiuittlng addl Irvfo r 
anvlron q,ual 1 f icJt ion of TMI action I temt contalnrd In 
NUREO-0737 

UHRIO, R G. Florida. Pouur fa Light Co, 92/09/84 VAFlOA.g, A, 
Opvnting Rtactart Brnncti ) Sipp IS 373 1SS 24X 
FieJif 3Q-2BQ. 03/09/24, BB100l029iS 

B2l004QaBl ForuiArdi rvitii chadult far providing final retponn ra 
control of hav^ laadi on Ouldtlin* 4 dpgclal lifting 
dvvicit) t. Oulrfelln* 7 (cranf deslg-n> Only manufacturer* 
can obtain rvquetttd Info 

UHRIOpR E FlOTid* Power b Lljht Co, Ba/0?/ao, VAROA, B A. 
Operftfelnd R*ctort Branch 1. 2pp. 18621,163, 24 S 
Fi<h*iHO-a5tt. 



B2101&0107 RtvUd pplU*Uan for ftmendi 97 I Bl to 
DPfl-41. rsp*ctlvH)'SiiTr*ctIng tvpographlcl e/rro 



I>PH-3l t> 



OHR 



DHRIQrR,E FHrlda Pnuer S< tight Go BS/10/JI EIBENHUT. D 0. 
DlvU(PH of (.Utnitng lp. 15704;OES. a*X Piche: 30-280, BB/ 10/11, 
ea i oiso-107, 



(Jorricttd p*gtt to Tech eptti r* BUR u r repkaclno 
B01230 tubmUt'l. 

Florid" Power & Light Co 38/10/11, Bpp, 15704,026 
o, ea/io/i l, aaiojB0407. 



851013043*? MviiM tN*t rfvLnw of current statut of nucl*r pouitr plant 
staff marling hourt par 9anirlc Utr BH-K indUtt 
rtituirementf *dnwtflv *nforc*d b-u Jncprportlon In 
ai)iniiiitratlv procvrivrit Amtnrf to Tach Sjie unn*c*t*ru. 
UHfltIOip,e. Florida Peuir t Liaht Co- 82/10/12. EiaE-NHUT^O. 0. 

004. Z4X Flch. OO-Z 



611 019055? Fnrwarijt puiflnt of prfl r o** d llctni* mend fit r> 
rtdundancu In flHR *i|". 

UHRIOtft. E Florid* Power & Lijht Cq, B3/10/18. MH-1.ER, H, 0. 

Llcent-i Fie Hng*n*nt Prnch, !>?> 15733:014. 24K 



--9210010339 Notice of violation from imp on 020826-0633 

LEWIS, J? C Division of Project tc Riiident Programs OS/ 07 fit 
S P P !55iS 330 34X Flche, 50-250, 32/07/13.0310010^16 

8310010346 IE Insp flipts 50-250/B2-24 & 30-251/83-S.l on f)3092t. OW 
Noncomp Nance noted Inadequate corrective action allouid 
recurri-neo Df reportabl* condition re failure to adfiire la 
radiation war* permit 

TOOT-LOWELL, R . JULIAN- C Dlviilon of Project d l)4il<l|iil Pre|ra>t 
B2/Q7/26 6pp [SiB,E3a 34X Flche 50-B50. 02/0?/ 13. OSIOOtC) i 

0209190233 IE Info Notice B0~35, Suppl 1, "Leahing I, DUloJ)fJ 1-151 
Implant Seeds " Qvc lilt end 

COBBrL, I. Diviilon of Fuel FacilltKsr Noteriali (, Btfiguirfl. 
62/10/04 Cons.nl (dated Editon Co of Neui York iipp I97&I JV3 

24X Fie he, 80-000,02/10/06,8808190233 

B2 1 0220394 Ach rvcaipt of 820927 Itr informing NRC of tttpt tjVcn ti 
corrict violation* noted in IE Insp Ripts SO-290/B3-BO i 
50-SSlfBS-Se 

LEHIBj R C. Divliion of Project ti Resident Pragrami Q3/lO'OD 
UHftlO.R E Florida Power t Uight Co lp 15776 093 R4IE 
: 90-230, 92/10/08. 8210220296 



1210320304 FUtpondl to NRG 820326 Itr re violations ndtl-i In 1C T 
Rfftt 5<J-EBO/aa-2B h 90-291/QB-3B Corrective actloni *c<til 
log ef tab ll-fhtd to control accin to high radiation araf 
AUrm 1^1 Initallid on Unit 3 RHR pit acc>* gate 
UHIOrR.E. Florida Power j, Light Co B2/09/27 a'REILtV. J ( 
Region 2. Qfftc* of Director 2pp. 13776-094. S4X 
Fithe.BO-K30, 83/10/06,0810380296 



eaioaaoato FOTWW*! IE tnp Ript so-aao/sa-aa t. 

980426-0723 b notice of violation. 
LEWIS, R, Q, DtvUIon ef Projict ti Rviidan'- Program* 
UHKIO.fi C Florida Pow.r J< Light Co. 3pp 10776 '094 
: 80-230, 62/10/Oa<a210Sa02fi 



941 



-8310230317 Notice of violation from imp on B2Q626-072B 
* Dlvlflon of Project * Riid*nt Programi. 
15776; OS'S. &4X Flchl' SO-SSO, 82/10/08,821 0880396 



DOCKETED ITEMS 



45 



--331022032? IE Insp Repts 50-250/02-20 J. 50-231/32-28 on B2O626-0725 
Hone amp lianee noted on B2O7O1 , ground level gates to Unit 4 
HUH pit stairways, surveyed at date rates exceeding 1,000- 
I'ounrf opin If unattended 

VOOT-LCyELL.R . JULIAN. C Division at Project t, Resident Programs 
82/08/24 Spp 15776 099 24X Fiche 50-250,02/10/09-8210230294 



8210190440 Eitends invitation to observe 821019 do 
emergency response syi at Technology for Energy 
Corp.Knoiville.TN 

UHRIO, R E Florida Pouer !, Light Co 83/10/12 
Division of Lioniing Ip 15741 186 24X FIc 
821019044O 



EIEENHUT, D 

B 5o-ooo.es/io/is, 



B2101 I KI35{ Advises that util review of current nuclear plant itaff 
iimrfclnj hours indicates that overtime restriction* meet 
intent of revised NRC policy Requirements incorporated in 
jjni t n i strati vt procedures need not be added to Tech Specs 
UHRIQ.R Florida Power fc Light CD 82/10/12 EI8ENHUT, D 
Civilian of Lictnling Ip 15742 111 24 X Fiche 50-250, S2/ 1O/12. 
821O 190351 

930819O239 IE Bulletin 93-03, "Stress Corrosion Cracking in Thick- 
Ual 1. Large-Diameter, Stainless Bteel . Rec Ireu latian Bus 
Piping at BUR Planti " Svc list one 1 

DEYOUMQ, RC Director's Office, Office of Inspection and 
Enforcement G2/10/14 Consolidated Ed i tan Co of NBU York 

IISpj). IS810 125 24X Fiehe 30-000, 82/1O/ 14. 0200190238 

8 Raportable occurrences, LERs d related correspondence 

B2100SCHO4 Foruards "Engineering Evaluation of Fteduater Transient fc 
Sui Pipe Dpeat at Turkey Point Unit 3 on 801119," In 
response to request re Congressman DD Faicell 010129 1 tr 
MCCHELSON.C Director's Office 81/03/O2 REHM. T A Office of the 
Encutive Director for Operations Ip 15670 001 24 X 
Ftch* 90-230,81/03/02,8210080104 



B21009O252 Foruards LER 82-Q12/01T-Q 

UILLIAMS.J W Florida Power b Light Co 82/10/O1 
Region 2, Office of Director ip 15638 113 24X 
Rich*- 90-250, 02/10/01, B2100B02S2 



O'REILLY, J P 



--821QO8G257 LEB 82-012/01T-0 on 820917. inp revealed that electrical 
p*n tT-ation did not meet double barrier criteria at 10CFHSO 
!. testability requirements of App J Caused by failure to 
properly document plant changes Plant change implemented 
PACE.P L Florida Poluer d Light Co BH/ 10/01 Region S, DPflc 

of Director 3po 13638 113 2flX Fiche 50-230,02/10/01, 
6S1OOB0252 



B210H601.lt Forwards LER 02-013/03L-0 

WILLIAM8,J H Florida Pouer 5. tight Co B2/10/1B 
Ftfli(m S, Office of Director Ip 19799 103, S4X 
Fiche 50-2SO,a2/10/lEtr0210260116 



O-fiEILLY, J P 



9210280291 Forwards Revulon 1 to 10CFR50 App R fire protection revieui 
Revision corrects typographical error* (n B20701 sufimittal 
UHRIO. R E Florida Pouer & Light Co 82/10/22 EISENHUT, D 
Division of Licensing Ip 15B3S 080 24X Fiche 50-250,82/10/32, 
82 10280391 



8310280293 Revision 1 to IOCFR50 App R firB protection review 

* Florida Pouer t. Light Co B2/10/22 63pp 1 5838 081 34 X 
Fiche 50-250,02/10/22.8210200291 



P Operating license stage documents t* correspondence 



8210070007 Respond! to FOIA request for eight categories of records re 
steam generator* tt steam turbines App A documents provided 
in R Udell FOIA Request Bl-313 Foruardt documents lilted in 
App B 

FELTON, J H Division of Rule* and Records 02/08/10 LONQ, D J 
Winthrop, Stlmion, Putnam & Robert* 9pp 19i4S 063 24X 
Fichi 50-000, Q2/OB/IO, 0210070007 

8210200013 Responds to FQIA request for all i nternal. non-publ ic 
documents, memos, evaluation repti t- other matl dealing u/ 
nuclear plant operations Forwards documents listed in App A 
FELTON.J M Dlvisinn of Rules and Records 83/O9/17 MCINNIS, D 
Neuis b Observer 3pp 1 SBiO Oi5 24X Fiche SO-ODD, 02/09/17, 
0210280013 

0210280100 Notifiei that on 020224, C Alderson advised that refit sent r 
possible uiillful violation of reporting requirements t 
falsif ication of OA d guard qualification records at 
facilities 

RESNER.K E Office of Inspector & Auditor 02/03/01 Office of 

Inspector b Auditor Ip 15861 039 24 X Fiche 50-000,02/09/17, 
82102B0013 

8210030589 Requests submittal of fee; for 830406 request for Tech Spec 
changes re degraded grid voltage t< 020010 request for 
approval of mods to turbine runbacfc sys 

DIOOS.R M License Foe Management Branch 02/09/23 UHRIO, R E 
Florida Power (< Light Co Ip 15626 290 24X Fiche 50-230, 
82/09/23, S210090509 



--9210260117 LER 02-013/03L-0 on 820917, iteam turbine pressure control 
valve CV-37O7 did not close completely, resulting in poor 
pressure b causing >afetu relief valve to trip auxiliary 
f tiediiiater pump C Caused by foreign natter under valve seat 
PACE.P.L Florida Pouer h Light Co 82/10/18 Region 2, Office 

of Director 3pp 15799 106 24X Fiche , 50-230, BS/10/18, 
3210260116 



021001089B Forwards response to NRC 020217 Itr requesting addl info re 
environ qualification of TMI action items contained in 
NUREO-0737 

UHRIOrR.E Florida Pouer k Light Co B3/O9/24 V ARC A, 3 A 
Operating Reactors Branch 1 S6pp 15S73 125 24X 
Fiche 50-230,92/09/24,8210010392 



DOCKET 50-251 TURKEY POINT PLANT, UNIT 4 

F Security, medical, emergency t fire protection plans 

02Q917OO&2 Forwards Revision 6 to physical security pUn Revision 
withheld (ref 10CFR73 21 1 

UrlttlOjR E Florida Pouier & Light Co 82/09/00. EIBENHUTi D 
Division of Licensing 2pp 14910,069 24X Fiche 80-S30i 02/09/08, 
8209170062 

02-10190178 Releases public version of emergency plan Implementing 
procedure 

FELTON, J H Division of Rules and Records, 83/09/30. Document 

Management Branch Ip 15738 062 24X Fi ehe. flO-230i 82/09/30i 
8210190178 

921Q19O106 Forwards public version of Emergency Plan Implementing 
Procedures 30104i "Emergency Roster," 20101, "Dutie* of 
Eimrgeney Coordinator," 20107, "Fire/Explosion Emergencies" 
& 20 127 "Dutie* of Assembly Area Supervisor " 

UHRIO, R E Florida Pouar & Light Co 82/09/24 'REILLY, J P, 
Region 2, Off Ic* of Director Ip 15798 063 24X 
Fieh*. 30-290,02/09/30,8210190178, 

821Q19O194 Public version of Emergency Plan Implementing Procedure* 
H01O1, "Duties of Emergency Coordinator," 201O4, "Emergency 
Hotter," 20107, "Fire/Eplosion Emergencies" b 20127, "Duties 
of Audibly Ar'B Supervisor " 

* Florid* Power i Lioht Co 02/07/16 SOnp 137SB'Oi4 24X 
Fiche 30-290,02/09/30,8210190178 



0210060281 Foruards revised schedule for providing final response ro 
control of heavy loads on Guideline 4 (special lifting 
devices) & Guideline 7 (crane design) Only manufacturers 
can obtain requested info 

(JHRIO.R E Florid* Pouer t< Light Co 02/09/30 VAROAi S A 
Operating Reactors Branch 1 2pp 15621 162 24X 
Fiche 30-290,82/09/30.8210060281 

8210130407 Revised application for Amends 07 b 81 to Licenses DPR-31 & 
DPR-41, respec tlvely, correct ing typographical error* re DHR 
sys 

UHRIO, R E Florida Pouer t Light Co 82/10/11 EISENHUT, D 
Division of Licensing IP 15704 029 24 X Fiche 50-250,03/10/11. 
8210190407 

0210150413 Corrected pages to Tech Bpecs re DHR sys, replacing pages in 
801230 submlttal 

* Florida Power & Light Co 02/10/11 2pp 13704 026 24X 
Fiche 50-250,02/10/11,8210130407. 

8210150439 Advises that review of current status of nuclear pouier plant 
itaff working hours per QenerU Ltr 82-22 Indicates 
requirement! adequately enforced by incorporation in 
administrative procedures Amend to Tech Bpecs unnecessary 
UHRIO. R E Florida Pouer b Light Co. 02/10/12 EIBENHUT.D 
Division of Licensing. Ip 13705 004 24X Fiche 50-250,03/10/12, 
0210190439 

8210190559 Foruards payment of proposed license amend fee re 
redundancy in RHR sys. 

UHRIOifi E, Florida Pouier It Light Co 82/10/12 MILLER, H 
Llcen*e Fee Management Branch 2pp 13733 014 24X 
Fie he. 30-230, 02/10/12,0210190999 



46 



DOCKETED ITEMS 



Q210S20090 rtdvisei that procedures/plans submitted For l/nlt 3 for 
steam generator repair project apply to Unit 4 1 need not 

UHH!"R E" Florida Power b Light Co B2/EO/15 E1SENHUT. D G 
Dwlnon of Licensing lp I577B 163 24* Fichu 50-251, B2/ 10/15, 
621032009O 

921O27O253 forwards util B21012 1 tr containing payment of license amend 
fit re redundancy in RHR sys requested in NRC 820316 Itr 
UJIftlO.R E Florlila Power (.Light: Co B3/10/21 BICGS.R M LitsniB 
Fee Management Branch lp 15B2B S7B 24X Fiche 50-230, BS/ 10/21 , 
B31Q27O353 

Q Inspection reports. IE Bulletins ! correspondence 

0210070007 Responds to FOIA request for eight categories of records TO 
stam generators S, iteam turbines App A documents provided 
in Ud*ll FOlft Request Bl-313 Forwards documents luted in 
App- B 

FELTQN.O M Division of Rules and Records 82/09/10- LONQ, J 
Winthrop, Stimson, Pu tnam t J!ob ert* ?PP 1S4450A3 34X 
Fiche 50-000, 02/03/10-8210070007 

--B31Q07Q139 Foruards tabulated data on steam generator insp li maint at 
facilities Data should be provided to Ijtenseea 
[PPCLITQpT Operating Reactors Assessment Branch 33/04/01 
VAROA, S Operating Reactors Dranch 1 5pp 19645 131 24X 
Fiche 50-000,82/03/10-8310070007 

B21007O172 Forwards info re (team generator Integrity !. inspi at all 
operating PHRs, per 750320 fc 21 requests Details of insp 5. 
including defect indication*, tu-be plugging criteria & tubes 
plugged ui 1 1 not be provided eicept for Point Death 1 
GOLLER, K R Division of Reactor Licensing (NflR-1975 anlg) 
7S/O3/24 MACCARV.R R Division of Technical Review INRR-1975 
onli;) 5pp 15645 196 24X Fiche SO-OOO, 82/00/10, 821Q070007 

9310010316 Ac k receipt of B20825 Itr informing NflC of steps taken to 
correct violations noted in EE Insp Repts 30-250/92-24 & 
50-29 1 /B3-24 

DANCE. H C Division of Project !< Resident Programs 02/07/13 
UHRIO.ff E Florida Power t Light Co lp 1556Q 224 24X 
Fiche 90-250, 82/09/13, 0310010316 

8310-010321 fleEponds. to NRC B20726 Itr TC violations noted in IE tnap 

Repcs 50-250/02-24 t, 5O-251/H2-34 Corrective actions plant 

iianager discussed need for increased control af activities 

affecting fire barrier penetrations Mi/const penonnel 

UHRIG, R Florida Pouer t Liolit Co 93/00/33 O'REILLY, J P 

(legion 2. Office of Director 3pp 155oB H25 24X 

Fiche 50-250,82/09/13, B2100103l. 

B2I0010329 Forwards IE Insp Repts 50-250/82-24 k 50-251/82-24 an 

620526-06-25 6 notice of violation 

LEWIS, H C Division of Projtcfc !r BesiiTent Proor-ans B2/Q7/3& 
OUR 1C. R E Florida Power 6 Llg-ht Co 2pp 1 SSfiB S3B 24X 
Fiche 50-250,83/09/13,6210010316 

B21001033B Notkce of violation from insp on B20926-062S 

LEWIS. R C Division of Project V Resident Programs B3/O7/36 
2pp 15548 230 24X Fiche 50-350.02/09/13,8210010316 



IE Insp R*pts SO-230/B3-2il t 50-251/93-21 on 820326-0635 
Moncomp llance noted inadequate corrective action allowed 
recurrence of reportable condition re failure to adhere, ta 
radiation uork permit 

VOGT-LOWELL, Ft , JULIAN-C Division of Project t, Resident Program 
82/07/26 &i>p 19968 232 24X Fichu 30-350, 82/09/13, 3310010314 

8209190233- IE Info Notice BO-35, Sup pi 1, "Leating fc Dislodged 1-133 
Implant Seeds " Svc list end 

COBB.L I Division Of Fuel Facilititi, Materials tt Safeguard I 
82/10/06 Consolidated Edison Co of Maw York 66pp 15761 250 

24X Fiche 50-000, B2/10/06. B20S190233 



Aek receipt of B30?37 1 tr informing NRC of iteps taken to 
correct violation! noted in IE In-sp RepU B 0-3 5 0/92-80 t 
50~251/8a-2B 

LEHIB.R C Division of Project t Resident Progi-aBii B2/IO/08 
UHRlO.ff E Flontfa Power k Light Co lp 13776 093 24X 
Fien 50-350. 



--8210320310 Fopiuards IE Imp fiepti 50-B5O/B2-28 8. 30-351/62-30 on 
B2Q&26-0723 (, notice of violation 

LE-WrB.R C Division of Project & Resident Programs BH/OB/J6 
UHRIQ, R E Florida Power L Light Co 3pp 1577i 096 24X 
Fiche SO-250,B2/10/OS,B21022029i 

--6210230317 Notice of violation from ln*p on B204.26-0725 

Division of Prnjact 8- Resident Programs S3/OB/26 lp 
13776 098 24X Ficha 50-230,62/10/09,8210220296 

0210220329 IE Insp Ftepts 50-250/S2-SB i 30-251/03-28 on 020636-0735 
WoJicompltance notad on 82O7O1 , ground level gates tn Unit fl 
RHfl pit stairuisgs. survegsd at dose rates exceeding 1,000. 
found op-en & unattended 

Vn8T-LQHELL,R , JULIAN, C Division of Project & Resident Pro grim 
B2/OB/24 Spp 15776 099 24X Fiche 50-350,82/10/00,0310220394 

8310190351 Adviiei that util reviey of current nuclear plant staff 
uorting hours indicates that overtime restriction* meet 
intent of revised NRC policy Requirements incorporated In 
administrative procedures k need not be added to Tech Specs 
UHRIO.fi E Florida Pouior 6 Light Co B2/10/1S ElSENHUTiD 
Division of Licensing lp 13742 111 24 X Fichu' 50-230, 82/ 10/ I Jl- 
0210190331 

820819023B IE Bulletin 82-03, "Stress Corrosion Cracking in Thltl- 
Uall, Large-Diameter, Stainless Steel, Rec ircu latiun Bgs 
Piping at BWR PUnts " Svc Hit encl 

DEYOUNOjfl C Director's Office. Office of Inspection and 
Enforcement 83/10/14 Consolidated Edison Co of New Vor k 

H5pp 15810 125 24X Fiche 30-000, 82/10/ 14, B20819O23B 

S Reportac-le occurrences. LEFls & related correspondence 

8209210429 Responds to FOIA request for eight categories of LER i 
Forwards documents listed in App A 

FELTON. J H Division of Rules and Records B3/OB/20 ARNOtD.J 
Miami Herald 3pp 14946 262 24X Ficha 50-000,82/08/30, 
9209210423 

B2092105E9 Forwards draft FR notice re AO pressure transient i during 
shutdown at nuclear pouar plant for approval 
BIRCKS, W J Office of the Eieeutlve Director for Operation! 
B2/07/29 CHILK, S J Office of the Becretarg of the Commission 
llpp I494i 353 21X Fiche 50-000. B2/08/30, B20921043S 

62102700S3 Mil response to FOIA request for eight caUgorin of 1 bHi 
Forujards document* listed In App A App t) documents uithhald 
(ref FOTA Eiemptlon 5) 

FELTON, J M DIvilion of Rules and Retards B2/09/20 ARNOLD, J 
Miami Herald 4pp 1 5636 221 24X Fiche 50-331, 83/09/BO, 
B21OB7-0-OQ3 

82 1027 00 96 Concurs u/draft Cominlasion paper proposing facility law 
temp overpressure event as AO 

DENTON.H R Office of Nuclear Reactor Regulation, Director 
B1/OE./1& MICHELSOM, C Director's Office 2pp 1 3B36 370 H 1 * 
F(ch 50-291, 62/09/20,8210270083 



-B310220304 Responds to NHC B2002A Itr- re violations noted in IE Insp 
Repts. 30-250/62-28 I. SO-251/8E-Sa Corrective action iccess 
log titabllihed to control acceei ta high radiation araa-i 
Alarm iiji [nstallad on Unit 3 BHR pft access gat* 
UHRtO.R E Florida Power- t. Light Co 0B/0?/27 O'REILLY, J P. 
Region S, Office of Director 2pp IS77& 094 34X 
Fiche 50-250.62/10/05,32102202^ 



B20624O11 1 ? Requests approval of AO determination re pressure tr*ntl 
while- unit shuttfoun in preparation for startup 
DIR-CK.S, W J Office of the Eiecutlve Director for Operation* 
SECV-Ba-2&5 62/06/17 lOpp 15B36 272 24 X 
Fiche 50-S1,B2/09/20, B2102700B3 

8210060209 Foruarifs LER G2-013/03L-0 

HILLrAMB. J H Florida Pouer & Light CD B2/10/01 O'UEIU-V.J P 
Region 2. Bffic* of Dlnctar lp 15614 043, 24K 
Fiche 50-391,92/10/01,821006020? 

--82100&O21S LEfi GB-013/03L-Q1, an B20<?Oi,RCS experienced ra-nld dttriati 
preiiure Caused bij failed" open presstirl IMT ipraij valve 1 
Rgiebor manually trEpped d automatic safety Injection 
actuated Pressure control regained using charging pump* 
PACE, P L Florid* Pouer b Light Co 92/10/01 Retoft 9, QfMc 

of Director, 3pp. 15614044 24X Fiehe 30-251, B2/IO/01. 

ea 1006020? 

Qai019037i PND-n-82-107-on 921010, unit shut doun for ehdulnl 
refueling & malnt for & months, Al 1 three steam generators, 
mill be repliced Licensee plans neui releasa. 

LAND'S,* D, JULIAN, C ft Region S, Office of Director B3,/ 1 QV I !? 
lp I5740'3I5 24X Fiche 50-231. BS/lO/la, B21019037A 



DOCKETED ITEMS 



47 



DOCfET 50-254 QUAD-CITIES STATION. UNIT 1 

F Security, medical, emergency >j fire protection plans 



&JQ9290I25 F!eleas 



publ n 



rsion of revised generating station 



fnergeiscy plan corporate command c tr emergency plan 

inp le-ment ing procedure 

.FELTON, J H Division of flules and Records 02/09/16 Document 

Jlanajpnont Branch lp 15561 139 SIX Fiche 50-000, 02/09/1 6, 
S2Q9290I25 

-620 9 2 90189 Forwards public version of Revision 4 to generatiny station 
Ej-ergency plan corporate command ctr Emergency Plan 
Implementing ProcedurB EOF-3, "Envl ron/Emergenc ij 
Coordinator " Receipt fortti end 

P/uCLJfaKI, J E Commonwealth Edison Co 02/Q9/01 DEN ION. H n NIW 
- llo Detailed Affiliation Oiven lp 15564 123 24X 
FichP 50-000, B2/0<7/1A,S209270125 



-8209370225 Public version of Revision 4 to generating station 
emergency plan corpoiate command ctr emergency plan 

Implementing Procedure EOF-3, "Environ/Emergency 

(.oord inatar H 

PAJOilSKI.J E Commonwealth Edison Co 82/OH/31 llpp 

155i4 134 24* Ficne 50-000,82/09/16.0309290125 



H21Q010O09 Forwards info to suppl 820701 request for eiemption from App 
ft per 020917 telcon Request applies to Sections III G 2 a 
t, III C 3 b re installation of fire suppression sijs 
ftflUSCH, T J Commonwealth Edison Co 02/O9/23 EI6ENHUT.D 
Division of Licensing Bpp 1 5545 152 24X Fiche 5O-000, 82/09/23, 
8510010009 

G2I0120546 Releases public version of revised cover sheet to facility 

FELTCN.J M Division of Rules and Records 02/09/24 Document 

tlanasenent Branch lp 13672 219 2-)X Tiche 50-254, 82/09/2-1, 



--9210130551 Forwards public version of revision cover sheut to facility 
procedures Completion of encl checklist requested 

KrtUIVIANrtKIS, N Commonwealth Ellison Co 02/09/15 DENTON.H R 
Office of Nuclear Reactor Regulation, Director 6pp 15672 220 
24X Fiche 50-254.03/09/2-1,0210120346 

B2101504B7 Forwards IE Insp Rnpts 50-254/82-14 ti 30-565/02-16 on 
02OB23-25 b 09O3 h 09 No noncomp 1 ianc e notod 

i-EPPLER.JG Region 3, Office of Director 02/O9/30 REED. C 
Con-no rues 1th Edison Co 3pp 1S721 SS9 24X flchc 50-234,82/09/30, 
0310150407 



8310190753 Forwards S20922 1 tr re lat submittals of exercise 
scenarios l< failure to adhere to FEMA Guidance Memo 17 It 
FEMA does not observe eierc lie, of f s its authorities uil 1 1 not 
partlc ipate 

HIWD.J A Division of Emergency Preparadness b Operational Support 
B2/10/I2 REED.C Commonwealth Edison Co 2pp 15736 247 24X 
Ftche SO-254, 02/1O/12, 8210190753 

8210190760 Discusses concern* re late submittals of emergency eiertic 
scenarios t, failure to adhere to FEMA Outdance Memo 17 
Future eierciie not meeting intent of advance notification 
guidance should be postponed or canceled 

BF1EHENY. P J Federal Emergency Management Agency 02/09/23 
KEPPLEH.J Region 3, Office of Director lp 19736 249 S-4X 
FlchB 50-254,82/10/12.8210190733 

8210200361 Heleases public version of reviled emergency plan 
implementinD procadurei 

FELTON. J M Division of Rulei and Records 82/10/12 Document 

Management Branch lp 158S9 20-1 24X Fichu 50-254,82/10/12, 
82102B0361 

B2102SQ364 Forward! public version of revised emergency plan 
implementjnfl procedures, inc lud ing Procedures OEP 200-0 re 
emergency i ond i tions, OEP 200-T1 re omeraaniy action levels i 
OEP 330-3 re SPINO control terminal operation 
KOVACK, T 8 , OERNER.L F Commonuealth Edison Co 82/09/23 
DENTON.H R MM - No Detailed Affiliation Oiven 3pp 1S8S9 SOS 
24X Fiche 50 -254. 02/10/12. B210280361 

3210290375 Public version of reviled emergency plan implementing 
procedures, including Procedures QEP 2OO-O re emergency 
condition), OEP 200-T1 re emergency action levels i> OEP 330-3 
re SPINO control terminal operation 

Commonuealth Edison Co Q2/09/23 21pp 15859 2O7 24X 
Fiche 50-234,82/10/12,3210250361 

8210220358 Provides info re organization & performance of depts 
responsible for radiation protection ac tivl ti es, per 02O702 
commitment Training coordinator assigned in Apr 1902 to 
improve health physics training programs 

TRAMK.T R Commonwealth Edison Co 82/10/14 DENTON.H (1 Office 
of Nuclear Reactor Regulation, Director 9pp 15776 2H7 3-IX 
Fiche 50-000. 02/10/11. 0210220339 

8210230309 Respond* to 820917 telcon requDit for Info r fire 
protection safe shutdown rept Items 2 & 3 are preliminary 
results, SDBJ to revision following engineering review 
RAUSCH-T J Commonwealth Edition Co 82/10/18 EIEGNHUT.D 
Division of Licensing App 15790 2IS 24X Flche 50-334,82/10/18, 
0210250309 



--OHIOIEO'195 IE Insp Ropts 50-254/82-1-1 t 50-263/B2-16 on B20823-25 ii 
0903 t, 09 No noncompl lance noted Major areas inspected 
emergency preparedness eierciae & licensee actions on 
previously identified emergency preparedness Items 
PMILLIPB.H P . SMITH. M J , AXELSON, W U Division of Emergency 
Preparedness & Operational Support 82/09/29 ISpp I 37S 1 293 
24K fiche 50-254. B2/09/30, 82101S04Q7 

0210130376 Advises that ins tal l.it inn of off site dose calculation nje 
program Pullij operational tracking model t operational 
A-model will be delayed until 021231 to complete prime 
computer Installation 

BWftRTZ.E D Cnmmonuealth Edison Co H2/10/06 DENTQN, H R Office 
at Nuclear Reactor Regulation, Director 2pp 15602 098 24X 
Fiche 30-000, S2/IO/O6. 0210130376 

0210570047 Releases public version of revisions to Quad Cities, lion fc 
Dresden emergency plan anneies it revised gansrating 
station emergency plan telephone directory 

F ELTOH. J H Division of Rules and Records 02/10/OS Document 

Clanage-nent Branch lp 15877 313 24X Fiche 50-000, 02/10/OB, 
S3 10290 04 7 

6210290060 Forwards public version of Revision 3 to Quad Cities ti Zion 

emersencv plan anneies, fievl s i on 2 to Dresden emergency plan 

annei, Revision to Byron emergency, plan annei & revised 

generating station emergency plan telephone directory 

HOORE, H D Commonwealth Edison Co 82/07/30 DENTON.H R NfiC - 

Ho Detailed Affiliation Given 5pp 13877 314 24X 

Fiche SO-000, B2/10/OB, H210290047 

0210290077 Public version of Revision 3 to Quad Cltiei I, Zlon 

emergency plan annetes. Hevis i on 2 to Dresden emergency plan 
annei fe Revision to Dyron emergency plan anno 
* CommonuiBaUh Edison Co 02/06/30 325pp 15077 319 24X 
Fiche 50-000,82/10/00,8210290047, 



P Operating license stage documents If correspondents 



9210050142 Requests that charcoal adsorber F64-DVM2 be counted uUhln 
2 uks of rece Ipt, decay corrected to 770319 lnvels & 
raturned Liquid beta analyses results received in NIC 
B2Q9I7 Itr will be incorporated in rapt addendum 

PAPEfllECLOiC J Division of Emergency Preparednms t> Operational 
Support 82/09/2B KALIVIANAK IS, N CommonuiBaUh Edison Co lp. 
13603 167 24X Ficho 30-254,82/07/30,8210050142 

8210120105 Requests delay of implementation due dates re NURE6-0737. 
Items II B 2, "PUnt Shielding," II B 3, "Post-Accidint 
Sampling" d II F 1 I. "Noble Qa f Effluent Monitor " 
SWARTZ.E D Commc-nurealth Edison Co 02/10/04 EIBENHUT.D 
Division of Licensing 5pp 15i51 237 24X Fiche 30-000,83/10/04, 
8210120103 

8210260326 Forwards Revision 3 of Chapter 9 of "Qffsite Date 
Calculation Manual. " 

ODLDEN, J C Commonuealtk Edison Co 82/10/06 CASE, E 6 Office at 
Nuclear Raactfor Regulation, Director Spp 15805 137 24 K 
Fiche' 50-000, 62/10/06,0210260526 

8210260542 Revision 3 of Chanter 9 of "DfMlte Dose Calculation 
Manual " 

tt CofllmOTiuoalth Ediion Co 82/07/30 83pp 15903' 139 E4X 
Fiche 30-000,02/10/06,8210260326 

82101G0059 Provides addl guidance b clarification r 320806 requeit 
far addl Info per NUREO-0737r Item II B 3, "Past-Accident 
Sampling S^s " Detailed rellabilltu analysis not required 
to satisfy NFIC concerns 
CRUTCHFIELD.D Operating Reactors Branch- 5 02/10/08 DELOEOROE, U 

CommonujeaHh Ediion Co 3pp 157SO 004 24X Flche: SO-000, 
92/10/08, 8910180057 



B3102900B8 Public version of revised generating station emeroBney plan 
telephone directory 

OALLE. D P Commonuealth Edison Co 82/08/12 43pp 13878 218 
H4X Fiche 30-000,02/10/00,8210270047 



40 



DOCKETED ITEMS 



8210I907BO Foruardi "CE BUR Eitended Load Lini Limit Analysis for Quad 
Cities Nti-clear Payer Station Unit l.Cjcle 7 & Unit 2, Cycle 
6 " 

RAUSCH, T J Commonwealth Edison Co 03/10/12 EISENHUT.D 
Division of Licensing Ip 15736 20-6 24X Ftche 50-254,92/10/13. 
B2I01907BO 



B2JCOaOt7fl Forwards listing of piping sgs uhich fail to meet fQAH 
requirement s, p ir NRC EIQOB18 confirmatory action Itr IE 
Bulletin 79-14 oper-abi 1 1 tg evaluation updates will not be 
provided for Dresden U Quad Cities Final update bij Dec 1903 
fiAUSCH,T J Commonwealth Ednon Co B2/1O/01 KEPPLER.JO Fttjlr 
3. Office of Director 6pp 15640 159 24X Fiche 30-000, UJ/lO/Or. 
8210QS017B 



--S2IO19Q7B'5 "GE BWH Ejtended Load Lin Limit Analgsii for &uad Citiaa 
Nuclear Pouer Station, Uni t 1, Cgc Je 7 t. Un 1 1 2, Cgc 1 e & " 
* General Electric Co ^600-22192 8S/O7/3I 3lpp 13736 307 
24X Fichu 50-254, B2/ 10/12. 621 01907HO 

B310190445 Forwards supplemental response to Generic Ltr B2-05 re 
implementation status of NUF1E0-0737, I terns II fl 3, II F 1 Z. 
II F 1 3. 11 F 1 3 & II F 1 6, in response to BElOOi requeit 
SIWRTZ, E D Commonwealth Ednan Co B3/10/14 EISENHUT.D G 
Division of Ljcin.ing 5pp 15741 302 24X Fiche 90-000.82/10/14, 
82 1 Ol 9044 5 

8210250114 Application fat- amend to Licenie DPR-29. chang ing lafety 
relief actuating Betpoint of Target Hack valvi to 1,135 psig 
t, changing setjioint of tiuo el c tromat i c relief valves to 
1.119 pals 

RAUBCH, T J Commonwealth Edison Co B3/IC/1B DENTDN. H R Office 
of Nuclear Haacfcop Regulation, Director 3pp 13737 032 24X 

Fiche 50-254,132/1.0/18.9210250114 



Proposed changes to ^BI^ Spen changing *ft(j relief 
actuating setpaint of Target Rack valve to 1.135 piig i 
iB-tpojnt of tuo ilc tromaHc relief valvci to 1,113 pi fa 
* Comtnanuejiltli Edtion Co S3/IOyia 3p p 15797 O35 24X 
Fiche 5O-254, 03/10/13,6210350114 

3210250155 Foruarfs coTrectfont to propoisd Tech Spec Pagi 1 2/2 2-1 t, 
3 3/4 3-S, lup porting revleui of Puturi reloads tt reviled 
Figura 351, Sheet I, providing aitendfrd MAPLHGR vi etpaiure 
ciiTvci for barrier lead teat assembly Fuel 

RAUSCH. T J Cammoni*3lth Edison Co Sa/IO/lB DENTON, H Fl OFFics 
of Nuclear Reactor Regulation, Director Spp 1S7QB 233 24X 
Ficho 50- 



8210080190 Couf irrn* B21 103 enforcement conference at ftp a inn :i n f t rt 
aspects diiac latfld u/proc uremen t, instal lati on t uie af 
tiDn-qual 1 f 1 ed valve guides in electromagnetic relief valvet 
at faciliUaj 

SPESSARD. R L Division of Project fc Resident Programs t!3/l(l/iJ< 
REED. C Commouwsal th Edison Co Ip 15640 1G1 SIX 
Fiche SO-OOO, 62/10/O4, B2IOOB019O 



9209190233 IE Info NoUc 80-35. Suppl 1. "Leaking t, Dlalo 
Implant Eesds " Svc list end 

CdBBpL I Divinan of Fuel Facilities, Materials f, <j a f c 
Sa/IO/O6 Consolidated Edison Co of Neui Vorfc (,A[ip 

24X Fiche 50-OOO. H2/ I O/06. B200I90233 



IE BulLotin B2-03. "Stress Corrosion Cracking in IhUlt 
Hal I , Large -Di ampler, Stainless SteeliRecirculation BIJ s 
Piping at BWR Plants " Svc list enc 1 

DEYOUWO. R C Director's Office, Office of Inspection and 
Enforcement O2/10/I4 Consolidated Edison Co of 1 [leu Vorl 

115pp 15310 1S9 24K Fiche 50-000, B2/10/ 14, B20B1VQ23B 



it Periodic operating rnpnrts 1 related correapondenc 



9210130306 Forwards monthly operating repts for Qept 1?02 

HALIVIANAKIS, N Commonuiaal th Edison Co 82/10/01 Dlrt-rlor 

Office, Office of Inspection and Enforcement Ip IDitlO '1)9 .'*' 
Fiche 50-254. H2/IOy01, B2101303B6 



Monthly operating repts for Sept 1903 
8US9, R D Cummonuaal th Edison Co 82/10/04 I3pp 
E4X Fithe 50-254, B3/10/01 , B2I01303B6 



BStOESOlA 1 ? ftviid proposed Tech Spec Page* 1 2/B 2-1 & 3 3/4 3-3, 
lupporting review of Future reloadi !j revised Figum 3 9 lr 
Sheet 1, providing oitindnd HAPLMGR vi eipoture curves for 
barrier lead t*t assimlblij fual Supenedes BSODlt variicn 
* Comjnonuedlth Ediinn Co 62/10^ 19 4p p 15763 233 24X 
Fieh 50-000,82/10/13,8210350138 

0510250177 Errata t Addenda Sheet B.rvplating Page 4-10 to "LOCA 
Analysis Rept for Dresden l/nita 2 t 3 & duad Cltl< 1 i S 
Muclear Pnuer Stations " 

General Electric Co rfDO-2414AA EflR 08 03/09/30 3n p 
157B8 239 K4X Fithe 30-000, 82/iO/ 1S.B31 0290193, 



cm area temp 



S2tOZ500&9 Provides addl info re reactor water cleanup rocn 
monitors Temp elemanti cause no automatic plant reipans* 
Gtgantf contro 1 room alarms 
FAl/SCHtT J Commonwealth EdUon Co H2/1O/19 EIBENHUT.D 
Division of Licensing 2pp 15737 091 24X Fiche 30-000,82/10/19, 
B3/1O230069 

Inspection reports, IE BuJUtln* & correspondence 

B210I504B7 Forwards IE Imp Repts 50-234/82-14 k 90-269/62-16 on 
820023-33 t 0903 d 09, Mo noncomp lianc r noted 

KEPPLEfi, J Region 3, Office of Director 82/09/30 REED, C 
Commonwealth Edison Co 3pp 15721 389 24 X Flcht 30-254,83/09/30, 
G2I01504B7 

eaiQ15049S IE Inp Repts BO-334/B2-14 S< 30-3-65/8S-16 on fl20B23-33 S. 
O903 (r 09 No- nan<ompltanc e noted. Major areas inspected' 
emergency p repar idnis* etirclseii licensee actloni on 
prtvidutly identified emergencg preparednect itimi 
PHILLIPB, H p , SKITH.H J , AKELSON, M L Division of Eaergencg 
Preparedness b Operational Support 82/09/29 ISpp 13721 292 
BflX Fiche 50-HS4. 02/09/30, Bai01504H7 

8210060399 Ack receipt of 820910 Itr informing HHC of ittpt t*kn to 
correct violation noted in IE Insp Arpts 50-337/B1-39, 
50-249/81-32, 50-334/81-23. 30-aiS/Bl-33, 90-29B/B1-31 ti 
50-304/81-29 

8PEBBARD, R L Civilian of Project & Raiidsnt Program*. Ba/IO/01 
REED.C. Commonwealth Edidn CD Ip, 1961fl 394 24X 
Flehe; &0-000, aa/10/0'1 , H210060-3S9 



S Reportable ocEUvrencas, LEHs !i related correspondence 



BOUOA0561 DiicuiiB* Facility 770103 loss of air event d effKl nn 
tcram capabilltij Consorvati vo analysis of data indlcatai 
short opsntor response time Immediate scram on loss of 
control rod drivelina air handpr should be required 
LANIK.G Director'! Office BO/10/20 M1CHCLSON.C DiniUftr't 
Office 3pp 19692 26B 24X Fiche SO-254, BD/10/20, 



-BOJ 1060565 Forwards senior rendent inspector BOOBE9 memo rt ff*tl 
Of facility 77O1O3 lost of air event li its effect on Itr* 
capabi 1 1 ty 
HCPPLER, J Region 3. Chicago, Office of the DirocldT (W/u'fl* 

M1CHELSCIN, C Director's Office Ip 15692 271 24V 
Fiche 50-254,00/10/30,8011060561 

B0110&056a Dlicutos facllitg 7701O3 loss of air ovonl t, iff*** f 
icrair capabiltty Event indicates that scram discharoe vol, 
although Pilled to approi 59X capac i ti), was capable at 
accepting vol o-f uatsr to shut doun reactor aafelij 
CHRISSOTIHOS.M Region 3, Chicago. Office of the Dinctor 
GO/00/E? SPEBBARD, fl L Region 3, Chicago, Reactor tlpiral li.ni 
Nuclear Supfnrt Branch 2pp 15692 272 24X 
Fiche 50-254, BO/10/HO, 801 1060561 



921006.0398 Faruards LER 62-026/03L-0 

KALIVIANA^rS, N Camrnonuial th Edlion Co 82/09/37 
Region 3, Office of Director Ip 15616 017 2 -IX 
Fiche 30-234. fiZ/09/27, 8310060393 



S21OO&040S LEfl B2-026/03L-0 on 830906, f Unge seal gaitt Idt >4ll 
found nceedlng 30 SCFH Ic possinlij exceadlng Tech Sp*c llnll 
of 36 73 SCFH for double-gasket seals Caused bg sei] 
gasket detor f orat Ion Qasket to be rBpaired/replaod 
HENDEtJHALL.ee Commonweal th Edison Co 82/09/27 HH L Of. 3, 

Office of Director Ip 19616018 24X Fiche 90-254, 
8210060399. 



9210130324 Forward* LER 62-029/01T-0 

KALIvIANAKIS, M -CoiMionuealth Ediipn Co B 2/09/20 
Ft*glon 3, Office of Director Ip 19678 292 24X 
Fith 50-BS4, aa/09/2B,8210l30324 



HEPPLEH, J 



82100603&7 Retpondt to HRC K0712 Itr r violation* noted in IE In up 
Rtptt 50-S37/H1-39-, SO-249/Bl-saf 80-254/81-33, SO-S65/B1-23, 
80-H95/BI-31 & SO-304/B1-S9, Corrective ac tiani' training for 
ngt prtoritie* re plant aval lability uill b canductad 
REED.C Commonusmli Ed i ion Co fla/09/10 KEPPLER,J.fl Region 
3, Office op Director lipp 18618.338 24X 
Ftcht SO-OOO, BS/10/01, BSiOOA03S9. 



3210130323 LER 83-029/011-0 on 82091A, tuo small craclri found IB 
affected ion* of welds 12S-F9 & F10 of reactor water cleirvup 
lyi piping Causul bij stress corrosion Piping to be replaced 
w/stalnleiB itel pip* ti fittings prior to startup 
WILOUS,D Conintonuealth Edison Co S2/09/2B Region 3' Qff 

of Dlrsctor. 4jp 1367B 293, 24X Fiche 50-254, eS/0?/Mh 
8210130324. 



DOCKETED ITEMS 



49 



E?L0130413 Foruards LER B2-027/Q3L-0 
fALIYIANftKIS, I! Commonweal tfi Edna 
Jlpjion 3, Office of Director I p 
Fiche 50-251, B2/OW29, B210I 30413 



i Co B2/09/29 KEPPLER, J 
I56BO 243 24X 



LER S2-027/Q3L-0 on 030902, e lee tromagnettc relief valve main 
/alve guides It piston rings inadvertently ordered as 
nonsa f e ty-r e lated Caused by inadequate imp lamentation of 

T7ETZ.C- Commonwealth Edison Co B2/09/29 Region 3. Office of 

Director- Ip 15690 244 24X Fiche 50-254. 82/09/29, B2I01 304 13 

0=J|0130501 Forwards LER B2-025/O3L-0 

Krtl_IVIAIIftlUS. M Commonwealth Ediann Co 82/09/29 KEPPLER. J 
Jlejion 3. Office of Director- Ip 15602 109 SIX 
Fiehe 5O-2Sfl. B2/Q9/29, B210I30501 



! LEU 92-OP5/03L-0 on B30907, 1/2A standby gas treatment train 
heater found tripped dm ing Procedure OOP 020-1 Caused by 
conservative suitch setting due to inadequate aetpoint 
d i FFetenc. ea Heater trip reset 

L1HOU.H Commonwealth Edison Co B2/09/29 Region 3, Office of 

Director 3pp 15602 110 24X Fiche IiQ-254, 82/09/29, B21Q1305O1 



DOCKET SO-35S PALISADES NUCLEAR PI-ANT 

F Security, medical, emergency & fire protection plan* 

0310050302 Updates status (< schedule for responses to NUHEQ-0737, Items 
t D 3- "Plant Safety parameter Display Coniale" & III A S, 
"Improving Licensee Emergency Preparedness - Long-term " 
JOHNSON, fi D Consumers Power CO B2/09/3O CHUTCHF1ELD, 
Operating Reactors Branch 9 2pp 15402 359 24X 
Fiche 30-2S3, 82/09/30, B2I OOS03Q2 

821O2BOOSB Releases public version of revised emergency plan 

FELTBN* J M Division of doles and Records 02/10/03 Document 

Management Branch Ip 15862 124 24X Fiche 50-255,82/10/06, 
821Q2BQ058 

0210280061 Forwards public version of Revision 1 to emergency plan 

* Consumars Power Co 02/09/24 NRC - Mo Detailed Affiliation 

Given 3pp 15063 125 24X Fiche 5O-295, 82/10/OB, B310230O3S 

8310280063 Public version or Revision 1 tu emergency plan 

RAN/, J Consumers Power Cn 92/07/14 lOSpp 15862 137 24X 
FichH 50-255.02/10/00.0210230059 



2LO13O25I Fc-rcii4rds LER 82-O31/03L-0 

KrtLIVIflNAKIS- fJ Cammonuealth Edison Co 82/09/30 
Region 3. Office of Director Ip 1 5676 O94 SIX 
Fiche 3O-254, B2/09/3O. 821O1.1025J 



--11310130253 LEF1 D2-O31/O3L-0 on B20909.f(CIC sus taken out of svc tn 
uncouple turbine from pump Caused by need to perform 
scheduled turbine overspeed surveillance test 

LIHaU, H Cnmmonuie.ilth Edison Co B3/09/3O Region 3. Office of 

Director ] p 1S67S 095 24X F]Che SO-35-J. B2/09/30, 02101 302S1 

3JtO130J6i Toruards LER 82-032/03L-0 

HftLIWlAIJAKIS, N ComUDn'Jeal th Edison Co H2/09/30 KEPPLER. J 
Hegion 3. Office of Director Ip I 54O2 136 3<tX 
Tiche 50-254. B3/09/30, 0310130466 



Q21O3001CI7 Submit* response to NRC questions re util B20701 Pirn 
protection submit tal 

OQHNSON.n D Consumers Power Co S2/1O/25 CRUTCHF IELO, D 
Operating Reactors Branch 5 3pp 15037 191 24X 
Fiche SO-35S, 03/10/25, 02102S01O7 



G Adjudicabary correspondence 



821O1901SO He^ust assntance in representing Oreat Lakes Energy 
Alliance in steam generator replacement proceeding Author 
de-eply involved in Midland proceeding 

SINCLAIR. M draft Lakes Energy Alliance B2/10/04 OAF1DE, 
Oovernmenfc AccountadiUtg Project 2pp 15735 323 24X 
Fiche 50-255i B2/10/04. 0310I904SO 



-S21O13047y LEU B2-032/03L-0 on B20905,HPCr removed from avc la/a 
actuation of e I er. tromat i c relief valves Caused by need to 
perform scAeduled turbine overspeed surveillance test UPC I 
si|E mill be- tasted operable upon return to pouier 

LEHOU. H CommonueaUh Etflson Co B2/O9/30 Region 3, Office of 

nttector Ip 1S6B2 137 alXritlie 50-234, B3/O9/30. S21013O46b 



0210000032 Motion for indefinite contlnuanco of proceeding Need f-nr 
steam generator rep lacoment alleviated due to better than 
eipected corrasion performance of steam generator tubes 
Future rate of corrosion unpredictable W/Certlf Icatc of Svc 
STEPTOE.P P Consumer* Power Co STEPTOB, P P Inham, Lincoln fc 
Beale 02/10/05 Atomic Safety and Licensing Board Panel App 

15640 209 24X Ffcho 90-233,03/10/05,0210000083 



Forwards LCD 82-Q30/Q3L-Q 

. N Commonwealth Edison Co B2/IO/01 
If* g i on 3. Office of Director Ip 15674 100 24X 
Fiche 50-234, 92/10/01.0210130193 



KEPPLEH, J 6 



03100S009? Notice of appearance in proceeding 

BTPTOE,P P Conumert Power Co aTEPTO^i P P liham, Lincoln ti 
Beale 63/10/05 Ip 15640 375 24X ftche BO-29S. 03/10/05. 
0210080099 



B3\Ql3QlVt> LEfl B2-030/03L-0 on B20905, lulii IB testing RHFI svc water 
pump 1 -IOO1 -65Di pac Hng found burned Caused by eicesslve 
tightening in packing to limit leakage Mods installed to 
protect bearings from seal leakage 

SCHNITZMEVER, J Commonwealth Cdlson CD 02/09/03 fleoion 3. 

Officfl of Director 3pp 15674 1O1 24 X Fiche 50-2S4, B2/ 10/01, 
Q31O13CH92 



62102700B7 Rstpoma to applicant 031003 motion for indefinite 
continuance NRC dom nc-t object to motion Certificate of Eve 
encl 

BABTHiC A Hearino Branch 1 82/10/23 Atomic Safety and 

Licensing Board Panel 2pp 13BS2 330 24)1 Fiche 30-235, 02/1O/25, 
02102700B7 



i2lGl<?065B Forwards LER 02-020/03L-0 

hfltlVIrtlMHra. M Commonwealth Edison Co S2/10/04 
Rooion 3, Office of Director Ip 15737 267 24X 
Fich* 30-254. H2/1Q/Q4, 0210190658 



KEPPLER, J 



-B210190700 LEB 03 -030/03L-0 on 030930 t 21.RCJC area high temp 
isolation 01S-2B.3 switches 1-IJ60-14A, 1-1360-17B t, 
l-136O-l6Cr would not trip Cause not specifically determined 
Failed switches returned to manufacturer for analysis 
PfiEUBS.M Commonwealtti Edison Co 82/10/04 Region 3, Offitt 

of Director 3pp 15737 26B 24X Flcha 50-254,83/10/04, 
62 1 01 906 59 



21O2S0148 Forwards supplemental UER a2-022/Q3L-l 
HALIVIANAKIS, N Commonwealth Edicon Co 82/10/07 
flegjon 3. Office of Director Ip 15787 360 24X 
Fiche 50-254, B2/IO/07. 0210250140 



KEPPLGR, J 



P Operating license stage documents ti correspondence 

8310120033 Ack receipt of 820030 application proposing Tech Spec 
changes re ESF filtration sgt Application provide* 
luppltmintal Info to 7B0306 pre-fee application No add! ft* 
required Refund of B3QB30 application fee authoTliid 
MILLER, M B LJctnie Fee Hanaoem*nt Branch 83/09/23 
VANDEUALLE. D J Consumers Pouer Co, Ip 15689' 203 24X 
Fiche 50-393,82/09/23,0310120033 

821005007H Discu*s 020209 final assessment rept for 0EP Topic IX-4, 
"Boron Addition 8v " CJiict valvm 3408,3409 & 3410 tfioultf 
bt added to T*ch Spec Table 4 3 1 RuponiB requested uithin 
45 diyi 

CRUrCHFIELD, D, Operating fllactorl Brinch 5 92/09/89 
VANDEMALLE.D J Consumers ROUST Co 2pp 1S603 1S6 24K 
Fiche 30-255,62/09/29,9210030073 



-0310250153 Supplemental LEF1 B2-022/03L-I on 820816,maint outage for 
1/3B dleiel fire pump eiceeded 7-day limit Cause not stated 
Diesal pump luear rings replaced 

LIHOU, H Cammanuealth Etjison Co 83/10/07 Region 3, Office of 

Director Ip 157B7 361 24X Fiehe 30-254,02/10/07.0210250148 



3210070013 Forwards draft "Offilte Da Calculation Manual" for 
facilities 

VANDEWALLE, D J. Consumer* Pouer Co 83/09/2? CRUTCHF1ELD. 
Operating Rtuctort Branch 5 Ip 13*28 223 B4X 
FichB'9O-000, 62/09/39,8310070013 



3IO204c.7 PMO-III-02-1I2 utll notified that high density fuel storage 
racfc* installed do not meet design criteria for spacing due 
to bowing condition Manufacturer reanalyzed seismic response 
of racks & concluded bowed distance acceptable 

GRDBE.J . HrtLKER.R , 8THEETER. J Region 3, Office of Director 
S2/10/1B Ip 13806 237 24X Fiche SO-H54, B2/10/18, 8210260467 



0210070018 Drift "Offilte Dos* CulcuUtion Manual," Pulisaifai Plant 
Consumer* Pouier Co 82/09/24 SSpp 15628 276 24X 
Fiche- SO-000, 82/09/29. 8B10O700O 



DOCKETED ITEMS 



821C03Q265 Confirm* that auiiHarij feeduaUr >g mod provides for pumpt, 
P-8A & P-BC to be loaded on emtroentv Jieiel generators upon 
Ion of off si t power 

JQHNSON.B D Con.uinr* Pouiir Co B2/09/30 CRUKHFIELD, D 
Operating R.acton Branch 5 lp 19610 233 24X 
Fiche 50-255,82/09/30,3310050265 

gaiOOSOSOa Uadt*i -status t schedule for responses to NUREQ-0737, Items 
I D 2, ' J Plant Safety Parameter Display Console" tc III A S. 
"Improving l-icenm Emergency preparednesi - Lang-Term " 
JDHNSQN f 9 D Consumers Paiuar Co 03/09730 CHUTCKF1ELD. D 
Operating R-aeton Branch 5 2pp 15602 359 24X 
Fiche 90-255, S2/07/30.B210Q50302 

B21O13007B Submiti Info ft failure of control rod to fully insert 
during teiting in hot shutdown condition Locking pau & pin< 
piiton guido tube, rack aisemblij * oivel gear homing 
replaced All defective uncoupling tools ramovid From ivc 
JOHNSON!, B D Consumers Pnuer Co B2/10/06 CRl>TCHFIELD, D 
Op era tins Reactors Branch 9 4pp 15451 B4fi 24X 
Fiche 30-253, 82/10/06, aai01E007B 



9210200276 Inform* of neuj commitment datei for MJREC-0737. Itemi 
II F 1 I. II F 1 B, II F I 3, II F 164 II D 3 
JOHNSON, E D Consumers Power Co 92/10/35 CRUTCHFIELD, D 
Operating Reactor* Brand! 5 3pp 15937 304 24X 
Flcne 90-2SS, aa/IO/35, 32(0290276 



Inspection report*, IE Bulletins f. c orresp 



B2100B0015 Addl response to FQIA renueft for 19 categories of info r 
nuclear reactor events S- safety problems Forwards document! 
listed In App A Documents in ftpp B completely withheld {ref 
FOIA Eemption 5) 

FELTQN.J M Division oF Rules and Records 02/07/12 UOELLrR A 
Critical Haas Energy Project 9pp I56i5 037 24X 
Fiche 90-000, Q2/07/ia,B2100a0015 

H21QOH0144 Systematic aiieRsmerit af licensee performance notei rt 
l*eilltg evaluation for 79090 1 -BQ090 1 

NRC - No Detailed Affiliation Given 80/09/01 iQpp 
11669 015 24X Fich" 50-000, Q3/O7/ 13, D2100BQ015 



82101203B3 Foruard* *uppl ta safety avaluation of BEP Topics II-3 A, 
II-3 B h 11-3 C reanaJyiirto design basis urg level for 
fjcility Unrctolvrif diffifences nou camidereil acceptably 
riio-lVBit t< topic ravieiui Complete 

HAMBACH.T V Operatino Beactori Branch. 5 B2/1Q/07 
VAMDEHALLE. D J Con^umerl Pouer Co, 5pp 15653 033 24X 
Fiche 30-255, 62/10/07,8210)20323 



9210070007 Repond to FQIA request for eight categories of record* 
iteam genirators It steam turbines App A documents provided 
in R Udell F01A Rquest BI-313 Forwards documents listed In 
App D 

FELtON. J M Divimion of Ftitles and Records Ba/OB/IO LOHO, J 
Uinthropj Stinnon, Putnam (. Roberts 9pp 15645 063 24X 
Fiche 50-000, B2/OB/10,H210070007 



S3lOt3O32i Comment* on proposed nopi of Phase III of SEP at reflected 
in individual topic definition! appended to B2090? Itr 
Staff incourdgacl to develop i. implemenl; means to incorporate 
poitive attribute* of Phase III in I ictniee/NRC interface 
KACJCH, R M SEP Qunnr-i Oroup aa/lO/O? EISEHUT-D Division nf 
Litensinu 7pp 15603 179 24X Fiehi 50-000,62/10/07,9310130326 

82101S0110 Frovldvi add! guidance re purpose of HF1C B20630 reiuest 
for aildl info concarnins NUREO-O73S, I tm 11. B 3 re 
poit~*cc1dent iiffipling <vs 

CRUTCHFIELD, D OperJtina Rticton Branch 3 63/10/07 
VA.NDEUALLE, D J Corumei-s Power Co 3pp 13719 319 341C 
Flcln:50-255, 82/10/07,8210160110 



B210070172 Foruiards inPo re steam generator integi-ity (. intps at all 
operating PWRs. per 7S0320 * 21 requests Details of intps, 
including defect Indication!- tube plugging criteria b tubes 
plugged uill not be provided eicept For Point Beach 1 
ODLLER.K R Division oP Reactor Licensing (NRR-1975 onlif) 
75/03/24 MACCARY.n R Division of Technical Kevieu INFtn-1975 
only) 5pp 19645 196 24X FichB 50-000,02/09/10,3310070007 

8210190421 Forwards IE Imp Rept 5Q-255/B2-30 during Auo 1983 t r.alJti 
of violation 

STflEETERfJ F Division of Project (. Resident Proorami 
DEWITT, n D Consumers Pouer Co 2pp 13741 034 24X 
Fiihe 30-2S5. B2/O7/39, B2IO190421 



G210130334 Foruardt evaluation* o-f open Itirat identified In NRC 830213 
Itr re BEP Topic 1 1 1-7 B, "Design CoistrDai ior Criteria b 
Load Combination*'" per utll 320917 Commitmsnt Code change 
uitll not affect i*fetij margin of plant structures 
WNDEMAULE, J Consooiers Power Co FJ2/10/OB CRUTCHFIELD, D 
aper&tlng Riactart Branch 3 \Sff- 1S679 140 24X 
FichB 30-295,02/10/08,6210130334 

B210170459 Forwards current status of program to- evaluate Jnuacy af 
overload Si short-circuit protection tor elactrlcal circuit! 
that pats through reactsr containment per BEP Topic VIII-4 
"Electrical Penetrations of Reactor Containment " 

TONER, K, A Coniunun Powir Co 82/10/12 CRUTCHFIELD, fr Operating 
Reactor* Branch 5 21pp 19740 ttbB 24X Piche 30-000, B3/10/1S, 
S3 10190499 

921019&35 FoTUtrdi lummBri) af (ctioni taken to uddrei* specific 820412 
draft KUREO-OaaO cane errs re eccintric loads tk valve 
functional) i 11 t<j in mall bore piping Summary of plant to 
perform addl analysts e-n control valve GV-3003 enck 

TONER, K. A Consumer! Pouer Co B2/10/13 CRUTCHFIELD, D Oparatlng 
Reactors Branch 9 91pp 197&1 299 84 X Fichu 30-293,62/10/13, 
G2101909HS 

asiOW054i. Summ*riie sttu ol utll commitment re 8EP Topic IX-3, 
"Station Svc ti Cooling Mater fiijf " Analysii verifying that 
component coaling water- tajnp limits are not erceeifeif undir 
postulated condition* uill bi lubnitteil bg 821113 

TQHEfl.K A Coniumen Pou*r Co B2/10/15 CRUTCKFIELD.D Operating 
Seactcri Branch 9 2pp. 19791. 3el, 24X Fiche 30-299, fla/IO/ 13, 
B2HH 90946 



B310S20IB6 Provlil*s- aJdl info re control roan totlc ch*micl i 
self-contained breathing ppr*tu in reiponie to NUREO- 
0737> Item III.D 3 4 on contol roon tiabltabi Uti/i pr 820730 
1-to.uei t 

JOHNSON, B D. Coniumeri Power Co. 82/10/IV, CRUTCHFIELD, D, 
Operatinj React on Branch 3. ?pp, 13777.354. 34 X 
Fichl 50-258,02/10/1?, a210220iaf> 



-8210190437 Notice of violation from insp during Auo 1103 
BTREETEH. J F Division of Project fc Resident Programi 
lp 13741 036 24X Fi the 50-359.03/09/39,0210190421 



-0210190449 IE Imp ftept 50-2SS/B2-20 during Aug 1903 Moneomp L i*nci 
not<d,an B30B31iDBA 0ei(.uencer Test Procedure T-I57 rivlted 
during implementation b new steps involving bijpast of safety 
functions performed ui/a permlsilon of shift supervisor 
JOROENSEN-B L . HELLER. J K , REYES, U A Division of Project I 
Resident Program* 82/09/29 7pp 19741 037 B4K 
Fiche BO-2S9. 02/09/29,0210190421 



Q210190699 Foruards IE Mgt Meeting Hept 30-B55/03-2I on DHO^Ofl fJo 
noncomplince noted 

KEPPLER.d Region 3, Office it Director 02/10/04 DEHITT-Ft I 
Consumers Pouer Co 3pp 19737 276, 24X Ticha 30-233,1)3/10/04, 
0310190699 

8210190707 IE Mgt Meeting Rept 30-833/02-21 on 020900 Mo noneonjll 
noted Kajor areas discussed current tt'tui of util program 
for meeting rtquiramen ts of 010309 confirmatory order rt 
regulatory improvement program 

JuRQENSEN.D L.. BPEBSARD, R, L Dtvitton of Project i, Hi<I*rl 
Progrnns 02/10/01 i3pp 19737 270 24X IMche 50-BB9.0a/ Itlf. 
8210190699. 



3208190233 IE Info Notice 00-39, Sup pi 1, "Leaving t< Dltlodgid [-1 
Implant Btldt, " Svc lUt end, 

COBS, L, I Di vilion of Fuel Facilities, Materials fc Bafeguirtf* 
82/10/06 ContolUatad Edison Co of Neui York 46pf 13761 

34X F i the- BQ-000, 02/10/06,02081 90233 



620019023B IE Bulletin B2-Q3i "Strets Corrosion Cracking In Thiil- 
Mall, Large~Dim*ter< Stalnlest Steeli Recireulitlon Silt 
Piping at BHR Plant)., " 8vc list me 1 

DEYQUNO.R C Director'* Office, Office of Inspection and 
Enforcement, BB/10/14. Caniolidated Edison Co of HIM VQV-! 

llSpp 19910:129, 24X Fiche, 90-000, 82/10/14, 0208190330 



9210260179 Respond* to- 820817 re^ueit for removal of adffiinUtrakive 
limit on auxiliary feeduiater flam rate to ittm ganerator. 
Limit* iflicirsifif in KRC 801001 t<nmeillati action Itr no 
longer appropriate New flou ratis ihouH be eitablithed. 
KePPLER.O.O Region 3, Office Of Director. B2/10/20, JOHNSON, B D 
Contumen Pauer Co, lp. 15799:036 B4X Fiche: 30-233, BS/10/20i 



B210260I7&- Act receipt of supplemental 02092? Itr in farm! rig NflC ftf 
ittpi ta.ken to correct Violations noted in IE Intp Rpt 
SO-2SB/92-07 

NaREL.il/9iC , Dlviiion of Engineering & Technical Projfuti, 
02/10/18, DEWITTiR.B Consumtri Power Co. lp, 19799 (MS 31 
FichB' 80-299, B2/10/18. 0210360176. 



DOCKETED ITEMS 



61 



821O26Q103 Suppls response bo K"C B30412 Itr re violations noted in 
IE Imp Kept 5O-29S/62-07 Coi rective actions NQS-traceab le 
hydrometer received t, compared in/by drometers used far 
lurve I 1 1 arc e Calibr results end 

JOHMSaN, B D Consumers Power Co 03/09/29 KEPPLER, J Region 
3. Office of Director 2pp 15799 O46 24X Fiche 50-255, 
02/10/60.6210360176 



Periodic operating reports 



> ipondance 



'210S3013B Forwards monthlij operating rept for Sept 1902 

KENNEDY. D M Consumers Power Co B2/10/OS NRC - No Detailed 

Affiliation Given fp 15673 090 24X Fiche 30-355,82/10/09, 



-B21QI30145 Monthly operating rept For Sept 1983 

PETERSON.!) A . VANDEflflERG. D Consumers Power Co 82/10/04 4pp 
15-673 091 24X Fiche 50-255, B2/1O/08, 821 0130138 



Heportable occurrences, LERs V related correspondence 



1210130146 Forwards LEU 81-01 1/03L-Q 
HOFFMAN, D P Consumers Pouer CD SI/03/37 
Chicago. Office of the Director 101/03/01) 
Fiche 50-255. Bl /O3/27, B3101 5O146 



KEPPLER, J Region 3, 
Ip 15697 083 SIX 



-B31OI50153 LER 81-O11/03L-0 on BI0304. d lese 1 generator 1-1 overspend t 
low air pressure alarms actuated t, mould not reset after 16 
cylinder leak test Caused by broken micro-switch due to 
high impact resulting From improper use of trip lever 
* Consumers Pouer Co 91/03/27 Region 3< Chicago, Office of 

the Director (B1/Q3/OU Ip 15697 OB4 24X 
Fiche 50-255.81/03/27,6210130146 



8210190404 Forward* LER 02-033/Q3L-0 

JQHN90N.B t> Consumers Pouer Co 02/1Q/11 KEPPLER, J Q HBBI" 3. 
Office of flirector Ip 15739 357 24X Flch* 50-1355,82/10/11. 
B210I9Q604 

6310190615 LER a2-02a/O3L~0 on 9309(5. b on c acid heat trace circuit 4O1 
(gravity feed lini to charging pumasl failed Hndundant 
channel remained operable Couied by failed heater element 
Heater element replaced 

Consumers Power Co 82/IO/H Region 3, Office of Director 

Ip 13739 359 24X Fiche. 50-253, BE/ IS/ 1 I, 0210190604 

8210190620 Forward! LER B2-039/03L-0 

JQHNSON.B Consumers Pouer Co 93/10/11 KEPPLEJ1, J Q Rsnion 3, 
Office of Director 1|> 15737 219 24X Fiche 50-353, B2/10/ 1 1< 
8210190620 

B21019062B LER B2-029/03L-Q on e2O9I6,T-82D {lafatu injection tank III 
level reached Tecfi Spec limit of 199 inch" three time* in 
34- h period Cain id bi; minor leakage p*it loop check valve & 
fill & drain valve Fill & (Train cycled tn itop leakage 

* Consumers Power Co 82/10/11 Region 3' Office of Director 
Ip 13737 220 24X Fich* 30-255, B2/1O/1 1 , 921Q190620 

8210190639 Foruiardi LER S3-030/03L~0 

JOHNSON. D D Coniumers Poiuer Co, 83/1O/11 KCPPLEf?. J O Rosinn 3, 
Office of Director Ip 15-740 044 24X Fiche 30-235,83/10/11. 
0210190639 

62101 90 1 4V LR 82-030/03L-0 on &3Q127, boric acid lieat trace circuit 133 
failed Redundant ehanntl remained operable Caused tij blown 
fuse in controller Circuitry tested 1 & Pua e replaced 

* Consumer* Paiutr Ce B2/IQ/11 Region 3j Office -of Director 
Ip (3740 045 24X Ftche 50-253.82/10/11,8310190637 



21OO7O415 Discueaes abnormal uear encountered on ALOVCO suing chock 
valves initalled in lou pressure safety Injection 5iji IE 
stiDuld istue info notice to inform licensees of problem 
MICHELSON.C Director's Office 91/12/23 OEVQUNO, R C Director'a 
Oiflte, OfFice of Inspection and Enforcement 5pp 15637 3S7 24X 
Fich* 50-255,81/13/33,82100701115 

55001COOQ Responds to FOIrt request for 19 categories of documents re 
nuclear reactor events (< safety problems Forwards documents 
1 11 ted in App A 

FEt-TOM, J H Division of Rules and Records 02/O6/28 UDELL. R, A 
Critical Mass Energy Project ISpp 1S727 005 24X 
Fiche SO-O'OO, 82/06/2B, 9210Q10QQB 

-B201200&53 Hecommenda issuance of info notice to inform licensees of 
problems u/AUOVCD suing check vatvet as encountered at 
facility Abnormal uear reported in LER B 1-037 
rllCHELSDH.C Director's Office B1/1S/23 DEVOUNC.fi C 
Director's Office, Office of Inspection and Enforcement 5pp, 
IS732 076 24X Fiche 50-000, B3/06/2B, B21001000B 

210040213 Forwards LEfl 0a-026/03L-0 

JQHMBOM, D Consumers Power Co 02/09/39 KEPPLER, J Region 3, 
Office of Director Ip 15613 097 34X Fiche 50-255.02/09/39, 
B31OO&02I3 

-0310040216 LER 82-026/03L-0 on B20901 . determined that four fire doors 
mfg by Protective Matls Co not documented to confirm testing 
& approval bij nationally recogniied lab Caused by vendor 
failure to obtain certification following mods 

CaniuJneri Pouier Co B2/09/29 Region 3, Office of Director 

Ip 13413 09B 24X Fiche 50-253.02/09/29,0210060213 

21O13O146 Forwards LER B2-027/03L-0 

JOHN50M, D J> Consumers Power Co 02/09/30 KEPPLER, J Region 3, 
Office of Director Ip 15673 OB4 24X Fiche, 50-2B3, 82/09/30. 
9310130146 

-8210130i56 LER 82-027/03L-0 on 020901 . procedural inadeo.uac i es 
diEcovered uihich could cause reduction in degree of 
redundancy In containment cooling lys Procedures revised 
to require fjns to be declared Inoperable If stopped 
* Consumers Pouer Co 82/09/30 Region 3, Offie* of Director 

Ip 1S673 005 24X Fiche 50-255, B2/09/30r B2J0130116 

JIO18O1B6 Furuards LER 82-031/03L-0 

JOHHSON.B D Con.umrs Power Co, S2/10/06 HEPPLER, J Region 3. 
Office of Director Ip 1371B 177 24X Fiche SO-B33, BB/JO/06, 



DOCKET SO-399 BRQUM8 FERRY NUCLEAR POUER STATION, UNIT 1 
F Security, medical, emergency & fire protection plans 

8209170101 Foruiardl minor revision* to proposed physical security plan 
Revision* withheld tret IQCFH73 21) 

MILLS, L H Tennesiee Valley Authority. 32/03/31 DENTON, H H 
Office of Nuclear Reactor Regulation. Director, 3pp 14910 OBI 
24X Fiche 50-2S9i 02/00/31,8209170101 

0310210034 STATION BLACKOUT AT DROWNS FERRY UNIT PNE>IOttINE AMD NOBLE 
GAS DISTRIBUTION AND RELEASE 
WICHNER.R P , WEBER, C F. . LOfiENZ.R A Oak Ridge National Laboratory 

FIN B-0452 NUHEO/CH-31B2 VOa B3/OW3Q Division of Accident 

Evaluation S61pp. (3773,001 34X FJche 50-259,03/09/3-0, 
03 102 10034 

8210330336 Forwards security plan table of contents Table of contents 
ulthheld (ref 10CFR73 21) 

HAMMER, D 8 Tennesiee Vill*u Authority 03/10/19 DENTOM, H. R 
Office of Nuclear Reactor Regulation! Director Ip L5?ea 363 21X 
Fiche, 50-299, 02/10/19, 0310350336 



Adjudicator!/ correspondence 



8210120391 Response to ASLAD 02O930 orilor to provide any supp lemsntal 
info re questions posJ to util Authoriiat [on i* for S-gr 
storage of lou level raduaita. la/v limit on use of module* 
for interim use on backup bails. 

RAW8QN, R,J Hearing Branch 4 82/10/03 Spp 13659 071 24X 
Fiche, S0-S39i Sa/10/OBi B2101SO271. 

0210120299 Affldivit of P Logien re afplication for storage of lou 
level radwast* No restriction rei(URsta<l or contempla ted 
limiting use of modules anlv to interim use an backup basis 
LOYSEN.P Advanced Fuel itBpent Fuel Licensing Branch aS/IO/OQ 
aapp 15692.079 34X Fiche , 50-289, 82/10/03, 82101S0291. 

B21012030B Affidavit of JR McOrath Ttmilg re<nrst Por ren*ual of 
facility license filed far Bs-atlif'NV lou level raduiait* 
dlspaial facilltu HV State Board of Health voted not to 
reneu facility licence, 

HCORATHiJ.R Auittant Director fop State Ajrim*nti 
ea/10/OB 2pp !SiB3. 10H 24X Flche.flO-K 



-8B10IB0191 LER 82-031/03L-0 on 030909,1-1 diesel generator water jacket 
h*ttr found inaperable Caused by corrosion of heater 
elsment. Heater replaced u/slmllar typt element Mod developed 
to replace heater element 

Consumers Power Co 82/10/06 Region 3. Office at Director 

Ip 15718 173 24X Fiche SO-2S3, 82/10/06. B2101801B6 



0210120316 Affidavit of 8N Salomon South*t IneT-tt*te Lou Lvel 
Raduaste Kg t Compact agreed to -clove BarnuialliBC Facility 
on 921231 & open new fite on 91 1331. Certificate af Bvc encl. 
SALOMONiB. N Ailistant Director for State Agraments Pro-aram*. 
B2/10/OB 4pp. 13632 104 21X Fiche: 80-2*9, 08/10/00,0210150391 



DOCKETED ITEMS 



B210230Q63 Telecopy mesiige of juation far ASLA& to grant 30-day 
intention to rsipond to ASLB B30920 order Tim* netesiary to 
eiplore settlement possibilities of til matters in 
controversy 

PYLE, B PIJ|, R B 02/10/30 Docketing i. Services Branch If) 

157B7 Ofil 24X Ficfie 50-259,32/10/30,8210250063 

62-10260429 Motion for eite-nsion of time until B21121 to respond to 
B2092Q order Time nee-iisarg to explore poii 1 b i 1 itiai of 
settlement Certificate of Sve end 

PVLE, R B Fylij R B S3 /JO/20 Atomic Safety and Liceniirig 

Appeal Panel 2pp 15906 036 21 X Fichs 50-259.62/10/20, 
82102A0429 



K Utility Final Sifatu Analysis Report (FSARt fc amende 



0308170297 Chapter 2 to Browns Ferry updated FSAJJ, "Bit* " 

* Tennessee Valley Authority B2/08/I2 346p,p 1-4852 302 
Ffche 50-359, 92/OB/13, B20B170S97 



P Operating license stage documents ti correspondence 

B210Q5026S Apol icat Inn to Amend License DPH-33. revlsins Cycle 5 mai 
criticaE pouer ratio values Error discovered In active fuel 
length used in original Cycle S analvils Approval ronuesled 
by 821119 

MILLS, L H Tennessee Valley Authority B3/09/31 DENTON, H 19 
Office at Nuclear Reactor Regulation. Director 2pp 15&11 331 
24X Fiche 30259, 92/09721 . 0210Q5Q2&B 



82100601 IB Si) itema tic assessment of licensee performance notn n 
facility evaluation for Apr I97<?~Mar 1980 
* NRC - No Detailed Affiliation Owen SO/03/31 App 
15667 3IS 34X Fiche 50-000.92/07/12,0210080015 

8210150105 Notifies that corrective actions re IE Insp RepU 
50-259/BI-13. 5O-36-Q/81-13 ! 50-296/BI - 13 delayed Procedure 
BPH NBQE3 re eiam of CSSQ items to be reviled by 820915 
&0R.J A Tennessee Valley Authority B2/07/13 8 'fiElLLf, J P 
Rejton 2. Office of Director lp 15701 159 24X 
Flche 30-239. 82/07/13,8310150105 

Bai0220t'51 Provide* iupplamental rssponso to NFIC Itr re violattani 
noted in IE Insp Repts 50-239/82-10,50-360/83-10 ', 
50-296/92-10 Div nf procedures Manual NB2A3 luill not be 
rvid until B2100I due- to scope of effort involved 
HIULB.L M Tennesiae Valleij Authority 83/OB/1B O'REILLY, JP 
Beoion 2, Office of Director lp 1 577H 104 24X 
Flche SQ-35 1 ?. 32/OB/IB, B21022015I 



B210O10035 Confirms 920909 iite meeting to dH 
r* raduai-te shipments Agenda encl 
O'REILLY. J P Region 2, Office of Director 
Tennessee Valley Authority 2pp 15565 16' 
Flche 50-259. 82/09/03. aaiOOlOOSS 



02/09/03 
24X 



82IOO10430 Faruards IE Insp Repts 50-359/82-25. 50-2tO/a2-a'> t, 
50-396/62-35 on 820910-11 Nn noncomp 1 i anco noted 

VEfiRELLl.D M Division of Project f> Resident Programs 03/09/01 
PAHRIS, H C Tennessee Valleij Authority 2pp 15570 211 J4* 
Fiche 5O-259. aa/09/03, 8210O10130 



32100&0271 PropolBd Tech Specs re mai critical fnouier ratio 

Tennessee vallecj Authority B2/OW31 3pp 15611 233 24X 
FicJie 50-2S?.B2/09/21,B2I005oa4Q 

82100&D301 Application to amend License DPR-33. updating curve of 
preai-ure v temp to extend applicability thro'iigh 5 
effective full pouer ijri Approval of changt re^uestid by 
Q21126 

MILLS, L H Tennessee Valley Authority B3/09/23 DEHTOH. H n 
Office of Nuclear Reactor Regulation. Director 2pp 1S419 2fJ 
24X FlchB 50-259,82/09/23,8310060301 



Proposed Tech Spec Figure 3 6-1. updating curve of pressure 
vs temp to attend applicability through 5 effective full 



v rennente Valley Authority 82/09/33 
Ftche 50-259.65/09/23,9310060301 



3pp 



6210070259 Forward's response to NRC request for dddl Info on 
NUHEO-061S, "Control of Heavy Loads of Nu-Elear Power 
Plants " 

MILLS, L M Tennessee Valley Authority B3/09/29 VASaALLO. D D 
Operating Reactors Branch 2 Sopp 19635 343 21 X 
Ftchu 30-2B9, B2/0?/29, 02I0070S5S 

62100002 IS Forward* addl info in response to NRC 820800 request re 
NUREO-0737. Item II K 3 24, "Adei^uaci) of Space Cooling far 
HPC1 * RCIC, " 

MILLfliL H Tennesiea Valley Authority 82/10/04 DEN TON, H R 
Office of Nuclear Reactor Regulation, Director 3pp 15639' 091 
S4X Fiche- 50-259, B2/10/04i 82100G031B 

9210130142 Foruards description of final modi & changes to BUR tcram 
ays t hort-term Interim tturniltnuntt for Unit S Mods uili 
bi imp leminteK for Unit Z before startup from Reload 4 
outa-ge lc subsequent Units 1 & 3 outages 

HILLS, L M Tvnneiiee Valley Auth&i-ltij BE/lO/Oi DENTOH, H. ft 
Office af Mu clear Reactor Regul'tloni Director 4pp 13673 OB6, 
B4X Flche 50-259.82/10/06,8210130142 

821.0250096 Foruardi revision to BE 1 006 implementing procedure* 
HILLS, L K Tetinvstee Valley Authority. 82/10/15 DEN TOM, H R 
Office of Nuclear Reactor Regulation, Director- lp 13793:098 
Ficht' 90-S97, 82/10/15,0210290096 



S-tX 



--B210250101 F1evii*d Imp Unending procedurei. 
Tnnse Vill eg ftutharlty &3/10/15 
Flche SD~S 



lipp 1B793, 059 



021001O-432 IE Insp Repti 50-259/83-35,50-360/02-25 fc S&-a?4/8?-a en 
020010-11 No noncompl iance noted Major areas Inspected 
reactor secondary containment integrity problem ti MBIV 
testing 

BROPK9, E M , JrtPE. F Division of Engineering 6 Technical I'mjiam 
82/08/27 4pp 15570 213 24X Fiche 50-239,02/09/01,02101110*^ 



9310150399 Foruai-ds IE Imp Repts SO-259/B2-2G, 50-360/9B-PO !. 
50-29A/82-2B on G2OB30-0903 No noncomp 1 lane e noted 
VERRELLI.B 11 Division of Project t, ResidEnt Programs 
PARRIS.H Tannesaee Valley Authority 2np 1 57Ofl 029 
Fithe 50-259. 82/O9/2Q, B210150399 



8210130406 IE Inp ftepts. 90-259/92-26,50-260/02-20 (, 50-aV6/(ja-3H ti 
80030-09Q3 No noncomp 1 iance noted Major areas inspected 
insrvic Imp program t inservire testing program review 
GIFtARD.E H , BLAKE. J Division of Engineering t. Technical 
Programs 9H/D7/1& 4pp 1 5704 031 24X Fiche 30-359, OS/09'2' 1 
32I01S0397 

0210010097 Approves revised cammltmont dates for Item 23 af App I to 
IE [n*ii Rents 30-259/91-19,30-260/01-19 & 50-296/B1-I? !. 
Item C 2 af App A to IE Insp Depts 50-259/03-12, 50-26O/Q2-IS 

t 50-29A/82-12 

LEUIB. R C Division of Project (. ftesident Programs 02/09/33 

PARRIS.H Tennessee Valley Authority lp 15563 GO I 34X 

Flche 50-259. 82/07/33,0210010097 

B2100IO1Q4 Dequestt citension to respond to App C. Item 23 tn [E Imp 
Repts 90-25'?/'81~19, 30-260/81-19 & 50-396/81-19 t. Item C 2 In 
IE Imp Rpti 50-2B9/B2-12, 50-260/82-12 t. 50-296/82-12 
Responses ui.ll be submitted by B30I01 & 021101, respec tlvilu 
MILLS, L H. Tennessee Valley Authority 82/09/O1 P'REILLV. ,1 P 
Region S, Office of Director lp 15565 O02 24X 
Flche 50-2B?, BS/09/22. 0210010097 

821001032& Forwards lummiry of 82 09 OB enforcement meeting u/uU 1 la 
ditcuit corrective actions re leakage during shipment of lou 
level uaste li utll plena for improving employee training 
D'RErLLY, JP Region 2, Office of Director B2/09/22 PAIJfllB.HI! 
Tennessee Val IBIJ Authority 4pp 1556? 188 24X 
Fiche:BO-a3J. 82/09/22,9210010326 

8210OL029O Ach reciipt of supplemental BS0901 Itr Informing NFIC or 
steps taken to correct Violation D noted In IE Insp ftvpti 
BO-259/B1-26, 50-260/62-26 & SO-296/91-2i 
LEMIB.K C Division of Project b Resident Programs 
PAftfUSj H Tannaisee Valley Authority lp 15S73 103 
Flche. 30-289, 83/09/24,0210010290 



Q, Inspection report*, IE Bulletins & correipondanc* 

8210080015 rtd-dl reiponsa to FOIA r*nut*t for 19 categories of info re 
nuclear reactor events & safety problems, Foryards document* 
lilted in App A Dociimints in App B completely ulthhtld (ref 
FOIA Exemption 9). 

PEL TON, J H Civilian of Ruin and Aecordl 82/07/12. UDELL, IT A 
Critical Hass Energy Project 9pji, ISiiB 037 24X 
Fichf 30-000, 32/07/12. QS100B0019 



B210010304 Foruiards reviiad response to NRC 8H02B Itr re vloUtle>l 
noted {n IE Insp Kept* 50-259/82-26, 50-260/02-26 t, 
90-296/82-2& Corrective actions R factor returned to within 
limits fc revision to Tech Spec approved 

MILLS, L,M Ttnnessee valley Authority 82/09/01 0'REILC.V. J F 
Region S, Office of Director 3pp 15573- 1B4 4X 
flcfie 50-259. B2/09/H4, B210010290 



DOCKETED ITEMS 



53 



a21030390 Foruarrfs IE Insp Repts 50-359/B2-29. 50-360/82-29 fc 
SQ-lfb/BS-S 1 } on B20906-10 No none omp 1 lance noted 

WERfiELUl.D 11 Division of Project t. Resident Pragrams B2/09/30 
PAFRIS.M G Tennessee Valley Authority 3pp I 377? 220 2-1X 
FuJie 50-259.02/09/30,8210350390 



210130565 Forward* LER 8a-O69/03L-Q 

GREEN. H J Tennessee Valley Authority 82/10/03 O'REILLY, J P 
Region 2, Office of Director Ip 1 5683 110 2flX 
Fichu 50-357, B2/10/05. 8310130565 



--E21G220'1Ol IE Insp Rupts 50-259/82-29,50-260/82-29 t, 50-276/B2-29 on 
E2O9O6-1O fJo noncomp 1 lance noted Major areas Inspected Unit 
3 refueling I maint outage & procedural compliance of 
health pjiys i c s-re lated practices bij workers 

COLLKJS.T R , BARR.K P Division of Engineering t Technical 
Program* 82/09/27 5pp 15779 223 24X Flche 50-259.83/09/30, 
8210220390 



-8210130569 LER B2-069/03L-0 on 830907, during startup testing, rod 
sequence control sys found Inoperable Caused by failure of 
QE sequence generator card Model 193B948QAA Card replaced Si 
testing sat isfac torllg completed 

IRDY, D J Tennessee Valley Authority 82/10/05 Region 2. 

Office of Director 2pp 136B3 111 24X Fiche SO-239, B2/ 10/03. 
0210130569 



2LOOB0219 Forwards revised request for relief from Inservice Insn 7 re 
inati e&sib le uelds in piping penetrations te under rigid pipe 
restraints Dest effort visual eiam will be performed during 
su.5 hij d i os tat ic pressure test 

MILLS, L H Tennessee Valley Authority 02/lO/Ofl DEN TON. H R 
Office of Nuclear Reactor Regulation, Director 3pp 15638 OB3 
24-f Fiche 50-259, B2/1O/04. B2IOOBO219 



B3QB190233 IE Info Notice BO-3S, Buppl 1, "Leaving J- Dislodged 1-135 
Jnplant Seeds " Svc list end 

CQDB.L I Division of Fuel Facilities, Materials & Safeguards 
BS/30/O6 Consolidated Edison Co of New York AApp 157M 2M> 

24* Ficha EO-OQO, B3/10/06 B2O8170233 

S3IO150218 Formal ds update of present uiork (c schedule for 

implementation of insps required under IE Bulletins 79-02 t 

79-14 Phase II evaluation mill not be completed until 

H40B01 

HILLS, L M Tennessee Valley Authority 92/10/O7 O'REILLY. J P 

Region S. Office of Director 2pp 15703 276 21X 

Fiche 30-259, 82/ 10/07. B31015021 B 

0209190239 IE Bulletin 8S-Q3, "Stress Corrosion Cracking in Thick- 
Hal 1, Large-Di ameter, Stain 1 ess Steel . Rec in u la tl on Sys 
Piping at BUR Plants " Svc list end 

DEMJUNC.R C Director's Office. Office of Inspection and 
Enforcement B2/1O/14 Consolidated Edison Co of New Vork 

l!5pp 15BIO 125 24X Fiche 50-000. B2/1O/ 1 ), 830B19O23B 

5 fleportable occurrences, LERs fc related correspondence 

C-210120129 Advises of need For in-depth evaluation of potential for 
unaccep Labla interaction octiueen control rod drive sijs & 
nonessential control air sys Margin of safety Inherent In 
licen^ncf design basis should be promptly restored 

rflCHELSOM.C Director's Office BO/OH/18 DENTQN, H fl Office of 
HucIoaT Heaclor Regulation, Director 3pp 15692 190 24X 

Fiche SO-296, GO/OB/IB. 8210120129 



8210130165 Foruards LEfl 82-072/03L-0 

OREEH- H J Tennessee Valley Authority 82/10/07 O'REILLY,J P 
Region 2, Office of Director Ip 1 S673 054 24 X 
Flihe 50-259, S2/IO/O7. B210130165 



8210130169 LER 82-072/O3L-Q on B20908, during startup, rod worth 
mini ml I er (RUN) applied rod blocks uihen rod 30- 5 1 selected 
Caused by lilting tuo rods twice in RUM sequence due to 
typing error RUM sequence corrected i returned to svc 
NAVE, E Tennsisoe Valley Authority 82/10/07 Region S. 

of Director 2pp 15673 O55 24X FUhe 50-359,62/10/07, 
8210130165 



821O13017B Forwards LER 92-075/011-0 

OREEIJ. H J Ttnnenee Valley Authority 82/10/07 O'HEILLV. 
Region 2, Office of Director Ip 19673 046 34X 
Fiche 50-259,83/10/07,8210130172 



-8210130176 LER 82-075/OIT-O on 820924, four degraded voltage relays, 
three timers t one 1 oss-of-vo I tags relay found to be outside 
allowable Tech Spec setpoint range Caused by setpolnt drift 
Relays recalibr t returned to svc 

CHRISTOPHER, N Tennessee Valley Authority 83/10/07 Region 2, 

Office of Director 2pp 15673 047 3flX Flche 50-SS?, B2/ 1O/O7. 
S210130172 



B21O130429 Forwards LER 8a-070/03L-0 

GREEN, H J Termenee Valley Authority S2/10/07 0'REILLV, 
Region 2, Office of Director Ip 15681 160 24X 
Flche 50-359r 82/10/07,8310130429 



B210I3043B LER B2-070/03L-0 on 82090B, whl le ealitir reactor protection 

*ys high-water live! stuitchet on tcram discharge tanki level 

switch LS-B5-4SE operated at 37 ga 1 Ions, c ontrary to Tech 
Specs Caused by callbr drift on level switch EL-305-EI-X 
IRBY, J Tennessee Valley Authority B2/1O/07 Region B. 

Office of Director 3(io 15681 161 34X Flche 50-399.62/10/07. 
821013042? 



520*300170 roruards LER 83-071/01T-0 

SHEtHiH J Tennessee Valley Authority B2/09/24 O'REILLY, J P 
Region 2, Office of Director Ip 13553 231 24X 
Fiche 50-359.83/09/24,8209300170 

--8^09300175 LER 82-O71/01T-0 on B20909.HPCI condensate storage tank 
lou level switches LB-73-56A 4 LS-73-36D failed to operate 
Caused by dirty b corroded level switches activating plates 
Plate points cleaned 

IFIHY. If J Tennessea Valley Authority 82/09/24 Region 2, 

Office of Director 2p p 13553 282 21X Flche 50-259,83/09/24, 
6209300170 



8310220053 Forwards LER 8a-073/Q3L~0 

OREEH. H J Tennessee Valley Authority 82/10/08 O'flEILLY, J P 
Region 2. Office of Director Ip 13778 204 24X 
Fiche 90-257, 83/10/08,8210230033 

B2102S0057 LER 82-073/03L-0 on 820910. while performino malnt on dlesol 
generator Ar fuel oil flowed out discharge filter drain vatve 
when transfer pumps Hipp lied oil to day tank Caused by 
personnel error Responsible person relnstructad 

PORTER, M R Tennessee Vallau Authority 82/10/08 Region S, 

Office of Director Ip I977B 205 2-1X Fiche 50-259, 82/1 0/OB, 
8210320053 



321-0060409 Forwards LER B2-067/03L.-0 

GREEN. H J Tennessee Valley Authority 02/09/30 O'REILLY, J P 
(legion a, Office of Director Ip 13615 319 24X 
Fiche 5O-339, B2/09/30.B21 0060409 

8310060113 LER 82-O67/O3L-0 on 82O901 . during normal operatl on. uih i IB 
performing fire protection surveillance imp, heat detection 
lone A for spreader room A common to Units 1 8, a found 
Inoperable Caused by loose fire protection panel relay 
rtURPMV. E Tennessee Valley Authority 82/09^30 Region 'A 

flffUe of Director 2pp 15615 320 24X Fiche 50-239r 92/09/30, 
B3 1 006040? 



8210290054 Forward* followup LER S2-023/03X-2 

OREEJ4, H Tennessee Villiy Authority 82/10/13 O'REILLY! J P 
Rsjlon 2, Office of Director Ip 13B54 050 24X 
Fiche 50-357,82/10/13,8210290034 

B210290057 Follouup LER B2-OH3/03X-3 on 820327. recircu lation pump 1A 
tripped due to spurious generator starter relay operation 
Caused by Hi-ttmp relay trip Relay reset in 20 minutes & 
pump return sd to *vc No recurrence control planned 

CHRISTOPHER, W Tennessee Valley Authority 82/10/13 Region a, 

Office of Director 3pp 13854 051 24X Fieh* 50-259,83/10/13. 
SKI 0290031 



Forwards LER B3-06B/03L-0 

J Tennessee Valley Authority B2/09/30 O'RCILLY. J P 
Rejion S- Office of Director Ip 15615 004 24X 
Fiche 30-259,82/09/30,8210060414 



8210290062 Forwards updated LER B2-042/03X-1 

GREEN, H J Tenneiaea Valley Authority 82/10/13 O'REILLY, J P 
Riglon 2, Qfflet of Director Ip 13853 339 24X 
Flchf 30-257, 82/10/13, B310390042 



8210060122 LER B3-06S/03L-0 on 820902, whi 1 e performing primary 
containment Isolation valve leak rate text. A hydrogen 
analuier became inoperable Caused by failed hydrogen sample 
Inlet pump power relay contacts 

CARTER, B D Tennessee Valley Authority 82/09/30 Region 2, 

Office of Director 3pp 15613 005 24X Fiche 50-259i Bfl/09/aOi 
S2COO&0414 



B310290064, Updated LER B2-043/03X-1 on BHOkiB, quarterl Surveillance 
Insp 3 S B for testing of HPCI (< RCIC vacuum relief valves 
not performed ptr ASXE Section XI Caused by personnel error 
Foreman misplaced performance reminder 

CAMPBELL, 0, Tennessee Valley Authority 83/1O/13 Region 2- 

Off*e of Director 2p 15833 340 2-)X Flche 50-239,82/10/13, 
82I029006S 



54 



DOCKETED ITEMS 



9210290317 Forward* updated LEH B2-031/03X-2 

GREEW. H J Tennessee Valley Authority 83/10/13 O'REILLV. J P 
Region 2, Office af Director lp 1 5853 OGO 24X 
Flche 50-259, B2/IO/13,B310290317 

--B2IQ29035I Updated LER B2-031/03X-2 on 820510, hydroOBn analijiBr B 
Inoperable du to failure of hydrogen sample Itilet pump 
Caused hij failurt of Allen Bradley rtl*1 Model 700-fjaOOAI 
contacts Relau Investigation results eipetted 93O31S 
CARTER, S Tennessee Valley Authority 83/10/13 Region 3. 

Office of Director 2p p 15853 OBI 24X Flche 50-239,62/10/13. 
0210290317 



8210290369 Foruardi LER B2-077/03L-0 

CflEEN.H J Tennessee Valley Authority B2/10/J5 
fiejion 3. Otfio nf Director lp 15653 OS3 2 
Ficfie 50-259,82/10/15,6210290368' 



O'KEILLV, J P 



--B210290371 LER 92-077/03L-0 on 820918, control rod 3B-39 declared 
inoperable due to fuse failure alarms A high-water level 
alarm indicating Caused by control rot drive hydraulic 
control unit accumulator level switch ising grounded 
Ml/HPHY,D E Tenne!ee Valley Authority B3/IO/1S Region 2. 

Office of Director 2pji I5B53 084 24X Fichu 50-SS9, S2/ IO/1S. 



9210260381 Forwards LEfi 02-076/03L-0 

SREEM, H J Tennessee ValJe Authority Ba/10/l<? O'SEILLY.J P 
Region 3, Office of Director If 13803 35? 24X 

Fiche 50-257,82/10/19,9310260391 

0210E604Q7 LER 82-O76/03L-0 on B2IW25, turb ine bids roof vr>t mrnilKor- 

CAM 1-90-251 became Inoperable Caused by failure of ptimp 

drive motor, model 6K56-2C due to end of natural Jife Drive 

motor replaced, 

THORPE, A A Tennessee Vallu Authority BB/1O/I Region S, 

Office of Director 2p 13803360 24 X Ficlie SO-259, B2/I O/ 19, 

B2102i036l 

6210260212 Forward* updated LER 62-Ofi7/03X-l 

flHEEN.H J Tnns*ee Va 1 1 eu Authority 83/10/20 O'REILLY, J P 
Rlgion 2, Qffica of Director lp 15799 153 23X 
Fiche 50-259, 82/ 10/20, 9210260218 

8310360222 Updated LER 82-067/03X-1 on 820?Dl,heat detection i one For 

(.prefer room A & pnactmn cprlnkler automatic initiation 

circuit Found fnoperabie Caused ti) lODle fir* prntection 

panel relay Relay reposltioned t clipped in place 

MURPHY, D E T(nn(B*>e Valley Authority B2/IO/20 Region a, 

Office of Director 2pj 13799 134 24X Flche 50-H&9. Q2/ 10/50. 

B210SA0212 



Adjudicator!; (orre'spondenc e 



82101202?! Rfiponse to ASLAO 020920 order to provide flnij sup 
info re quettion-i posed to util Author i lati on IE for 5-ijr 

for Interim me on backup bails 

RAUSCH, R J Hearing Branch 4 B2/10/OS Bpp 15653 071 

Ficne SO-259, B2/1O/OB, 82101 20291 _ 



821012029'? Affidavit of P Loysen re application For sloragi! of lev 
level raduaita No- restriction requested or concempla tetf 
llmltinj use of modules only to interim use on dacltup basil 
LOVSEN.P Advanced Fuel 5 Spent Fuel Licensing RraniN BJ/IC/ 
2-3pp IS6S2 O77 24K Fiche 30-259, B2/IO/OB. 



B21012Q30B Affidavit of JR McGrath Timely request for renewal l 

facility license filed for DeatlpjiNV low level radujas It 

disposal facility Nt' State Board of Health voted not to 

reneui facility license 

MCORATH, J R Assistant Director for State Agreement.! Pronjriss 

02/10/08 Spp 13652 102 24X Fiche 5O-259, 02/10/00. n2IOU'O.NI 

62J012031A Affidavit of SN Salomon Southeast Interstate Leu Livtl 

Raduaste tig t Compact agreed to close Darnuell.SC Facility 
on <?3l23l f* open n>u tite on 911231 Certificate of Svc enc] 
SALOMON. 5 H Assistant Director for State Agreements I'ragroni 
62/10/08 flpp 15452 104 24X Fiche 5O-259, 02/10/OH, OJIOK'02 ,1 

5210250043 Telecopy iressage of motion for ASLAB to grant 'BQ-d.iy 
eitenaion to reipond to ASL3 S2O920 Older Time necessary to 
eiplore settlement pou its 1 1 1 ties of all matters in 
controversy 

PYLE, R D Pyle. R D S2/IO/2O Docketing t Servic&s Dranih If 

157B7 Oil 24X Fiche 5O-259, B2/10/20. 02102S0063 

Sai02i>0fl29 Motion for attention of time until B3I131 to respond to 
030920 -orifer Time necessary to eiplore possibilities of 
settlement Certificate of Svc encl 

PVL,R D Pyle, R Q 62/1O/20 Atomic Safetij and Llcmilna 

Appeal Panel 2pp I5BO6 O36 24 X Fichu 50-259, 02/10/39. 
B210Z60429 



Operating license itage documents b correspondence 



B210070255 ForuarifB response to HfiC request for addl info on 
NUF1EO-0612, "Control of Keavif Loads of Nuclear Pouier 
Plants " 

MILLS, L fl Tenneisee Valley Authority B2/09/3B VABSrtJ-LlJ, B 
Operating Agactors Branch 2 Sipp 1S635 243 24X 
Fich* 50-239, B2/09/2B, 821 0070355 



T Hear-In! tranicr-ipt* on non-antl trust mattert 



B210070133 Testimony of JW Hutton answering ASLAD quesittons on lou 
level raduaite fflgt nptlont Availaollltu of adequate spat* 
to dispose of loui level uiastes in neit 5yri uncertain 
Certifteate of Svc encl 

HUTTOM.J M Tennessee Valley Authority S2/IO/OI ISpp, 
15627 03J 24X Flche 50-H59i 63/10/01 , B210070133 



DOCKET 30-2*0 DROWNS FERRY NUCLEAR POWER STATION, UNIT 2 
F, Security, ntdlcal, emergency & fire protection plnt 

8209170101 Forward! minor revisions to propanil phgilcdl securitg plan 
Rsvilioni uithhtld (ref 10CFH73 21) 

HILLS, L H r*nnetie Vall* v Authority B2/OS/3I DEWTON, H R 
aftict of Nuclear Reactor Rejulatiorii Director, 2pp 14910 OBI 
2JX Fie he- 30-259. eff/OB/31 , S209170101, 

plan table af contents Tabl* of content! 



8210230234 Foruards iBcurit 
withheld Cr*f 10CFR73 2U 
KAMMER.D B Tennee Valley Autha 
Office of Nuclear Reactor Regulation 
Fich* 80-239. B2/10/19, 8210250236 



ti) 6S/10/I9 
Dine tor lp 



DENTON,H H 

13739 363 



9JIOOS021B Foruards adtfl info in response to NRC B2080B requtfit ri 
WBEG-0737* Item II K 3 24, "Adequacy of Space Cooling for 
HPC1 fc RCIC " 

MILLB.L H Tenn*iee Valley Authority S3 /1 0/04 DENFON.K H 
Office of Nuclear Reactor Regulation. Director 2pp IS&IO <1V] 
3W Fiche 50-259, 02/10/04,9210090216 

6210130143 Foruards rfo'scrip t ion of filial mods b changes to BHH * 
-tys S short-term Interim conrnl tmentf for Unit 2 Moid uilll 
be jmplefflBnted for Unit 3 before startup from Reload 4 
outage & subsequent Unit* 1 b 3 outages 

HILLS, L H Tonnesie* ValJey Authority B2/10/06 DEN TON, 1 1 II 
Dfflco of Nuclear Reactor Regulation, Director 4pp 15673 Olifi 
24X Flene 50-259,62/10/04.0210130142 

82102S0067 Application to amen* License DPR-52 to accomodate Relnid 
Cycle 5 operation & outag*~rela ted mods Approval by B3QII.2 
requeited to avoid impacting refueling & startup 
MILLS, L.M Tenneisae Valle<i Authority S2/10/15 DENTDH, H P 
Office of Hue 1 tar flae tor Regulation, Director 2pg 15792 149 
24X Fich* SO-2-&0, BS/IO/19, B2102S0067 

8310250070 Proposa-o 1 Tech Spot c hangei, aecomodacinj Reload 4,Cycli 
operation It o<ut*ga~r*tate<[ mods 

* Tenne**fe Vallvy Authority 82/10/15 B2pp 13792 147 ? 
FitdeiBO-SiO, 02/10/15,8210250067 



Ba 10 23024 4 Forward* revisions to physical security plan Revisions 
ulthhaU (ref 10CFR73, 21) 

HAMMER, S Tenntisee Valley AJtfioritg BS/lQ/f) DENTON, H A 
Office of Nuclear Reactor Regulation, Dine tor lp, 13769 349 24X 
Flche. 50-290, B2/10/I9, BS10aSOS44 



-8310350074 "Supplemental "eloarf Licensing Bubmittal for n. r c-wn 
Nuclear Plant, Cycle 5, Unit 2j Reload 4 " 

HILF,C.L , I^RBIE, W, A , CHURNLEY, J 3 deneral Electric Co 
VIOOSSOlAflO 92/07X31 3fipp 15792 23O 24X 
FUhi SO-260, 82/10'/IS, 8210250067 



BZ102S0077 Errt* . Addentfa Sheet 4 to NEDD-240BB-1, "LOCA 
for Brown i Ferry Nuclear Plaint, Unit 2 " 

* General EKctric Co NEOD-240Ba-l NO 4 ERR 82/07/31 
15792,895, 24 X Flche 50-2&0, B2/IO/15, B21 0230067 



Bf(i 



DOCKETED ITEMS 



--a2lQ22007B Errata t, Addenda Sheet 5 to NEDO-240BB-1 . "LQCA Analy; 
r'oi Droons Ferry Nuclear Plant. Unit 2 " 

" General Electric Co NEDO-^OBB-l N05 ERR B2/OB/31 3pp 
15792 263 24X Ficne 50-260,62/10/15,0210930067 

P2I025GQ96 Forward* revision to 821006 implementing procedures 
hILLS.L M Tennessee Valley Authority 83/10/15 DENTON, K R 
Office of Nuclear Reactor Regulation, Directoi lp 15773 058 

Fifhe 50-259, S2/1Q/I 5. B21O250Q96 



15793 059 24X 



- B2 102501 Ol Revised implementing procedures 

Tennessee Valley Authority B2/IO/IS lpp 
Fithe 50-239 82/10/15.9210350096 



Inspection reports. [E Bulletins d correspondence 



A-ddi response to F01A request for 19 categories of info r 
nuclear reactor events I/ safety problems Forwards documents 
listed in App A Documents in App B completely withheld (ref 

FC11A Eiemption 51 

FELT01I, J M Division of Rules and Recntds 02/07/12 UDELL. H A 

Critical Mass Energy Project 9pp 15669 O27 24X 

Fiche 50-OOO, 82/07/12. B2100SOO1 9 



-B2lOQ9Olia Systematic assessment of licensee performance note 
facility evaluation for Apr 1979-Mar 1900 
- NRC - Ha Detailed Affiliation Given BO/03/31 6pp 
15667 315 24X Fiche 50-000. 83/07/ 1,2, B21 006001 5 



Notifies that corrective actions re IE Insp Oepts 
5O-2S9/al-l3 50-240/BI-13 1 50-296/B1-13 delayed Procedure 
DPI1 I-BCE3 re eiam of CSSG items to be revised hy 82O915 
DP-ER. J A Tennessee Va I ley Authoi i ty B2/07/13 O'REILLY, J P 
Region 3. Office of Director lp 15701 159 24X 
Fiche 50-259. B2/07/13. 8^10150105 

F,?lQ-33Q151 Provides supplemental response to HRC lir re violaliano 
noted in !E Insp Repts SO-2S9/B2-10, 50-260/B2-10 & 
50-296/62-10 Div of procedures Manual NB2A3 will not be 
revised until 831001 ifue to scope of effort involved 
MLLS, L n Tennessee Valley Authority S3/OB/1B Q'REILLY.J P 
Rpjion 2 Office of Duet lor lp 15778 106 34X 
Fiche 50-259. B2/OB/1B, B21022OI 5 1 

&;iGQtQO35 Confirms B20908 tite meeting to discuss recent violations 
re raduaste shipments Agenda end 

O'HEIULV J P Region 2. Office of Director as/Ot/03 PARR IB. H U 
Tennessee <. J alltt} Authority 2p p 19565 l&ii SIX 
Fiche 50-259.82/09/03,0210010035 

E121001Q430 Forwards IE Insp Hepts 50-259/02-25, 5O-260/EJ2-25 8- 
50-296/62-35 on B30B10-11 No none onp I 1 nnco noted 

VFRREUL I . D 11 Division of Project fc Resident Programs 82/09/03 
fViRBIS. ll<J Tennessee Valley AUthoi lly 2pp 15570 211 SIX 
full* SO-25 1 ?, 62/09/03, Q2100I0430 



S2100J0326 Foruiards (ummarij of B2090B enforcement meetlnj u/uti 1 to 
ducuu corrective actions re leakage during shipment of loiu 
level uaste It util plans for Improving employee training 
O'REILLV.J P Region 2, Office of Director B2/09/22 PARR IS. H IS 
Tannefsie Valley Authority 4pp 15569 IBB 24 X 
Ficha 50-259, 82/09/22, H2IODI0326 

B21DOl02?0 Ack receipt of lupplemental B20901 1 tr informing NRC of 
steps taken to correct Violation D noted in IE Inep Repti 
50-359/61-26, SO-260/B2-36 l< 50-396/BI-26 

LEWIS, R C Division of Project & Resident Programs 83/09/24 
PARR'S, H G Tennessee Valley Authority lp 15373 1S3 E4X 
Fiche 30-259, 32/09/34,6210010290 

--B2I0010301 Forwards revise* reiponte to NRC B1I03B Itr re Violation H 
noted in IE Imp Rapts 30-239/62-26, 50-26 O/B2-26 b 
5O-296/B2-26 Corrective actions fl factor returned to uilthin 
limits & revision to Tech Spec approved 

MILLS.L H Tennessee Valley Authority B2/09/OI D'HEILLY-J P 
Region 2, Office of Director 3pp 15373 184 24X 
Fiche 90-299, B2/09/24, BS10O10290 

9210220390 Forward! IE Imp Repts 50-259/83-29,90-260/82-29 i 
50-296/93-2? on 830906-10 No noncompl ianc* noted 

VERRELLI.D H Division of Project t Resident Programs B2/09/30 
PARR IS, H Q Tenneisee Ville v Authority 2pp 15779 230 SIX 
Fiche 50-3S7r B2/09/30,H2I0220390 

3210220401 IE Insp Repts SO-259/82-S9, 50-E60/B2-29 & 50-296/82-29 on 
320906-10 No noncomp 1 lance noted Major areas impacted Unit 
3 refueling d fflaint outage & procedural compliance of 
health phyi Ics-re lated practices by uiorfcen 

COLLINS, T R , BARR.K P Division o# Engineering & Technical 
Pronfams B2/09/27 Spp 1577? 222 24X Fiche 50-25<?r 82/O9/JO, 
B210220390 

82100B0219 Forwards revised request for relief from Inservice Insp / re 
inaccessible welds in piping penetrations (< under rigid pipe 
restraints Best effort visual eiam mill fae performed during 
sijs hydrostatic pressure test 

MILLS, L M Tennessee Valley Authority B2/10/04 DENTQM, H R 
Office of Nuclear Reactor Regulation, Director 3pp I963B OB3 
24X Fiche 50-359,83/10/04,8210000219 

8208190233 IE Info Notice 80-35, Buppl 1, "Leaking !t Dislodged I-1S5 
Implant Seeds " Svc lilt encl 

COSO.L I Division of Fuel Facilities, Materials & Safeguards 
82/10/06 Consolidated Edison Co of Neol York 66pp 19761 2 SO 

24X Fiche 50-000, 83/10/06, BSOB190233 

8210150318 Forwards update of present work tt schedule for 
implementation of irtsps required under IE Bulletin* 79-O2 & 
79-14 Phase II evaluation mill not be completed until 
B40B01 

MILLS- L,H Tenneisee Valley Authority 82/10/07 O'REtLLV, J P 
Region 2, Office of Director 2pp 19705 276 24X 
FichB 80-359, B3/10/07,B21Q19021S 



-Sai0010432 IE Insp Repts M>~?59/B2-2b, SO-2iO/B2-25 t. 90-296/82-25 an 
SZ0910-1I No noncomp 1 iance nateif Major areas inspected 
reactor secondary containment integrity problem * ME5IV 
*ei t ing 

DRCO^SrE H . JAPE. F Division of Engineering !< Technical Pniftrams 
82/OS/27 4pp 15970 213 24X Tlche 50-359,82/09/03,8210010430 



S30B190238 IE Bulletin B2-03, "Stress Corrosion Cracking in Thick- 
Nail, Large-Diameter, Stainless Stol, Reclrculation Syi 
Pipitifl at BWR Plants " Svc Hit end, 

DEYOUNO,R c Director's Offic*- Office of Inspection and 
Enforcement S2/10/I4 Consolidated Edison Co of N*w Vork 

113pp 19BIO 125 34X Fiihe SO-000, B2/10/ 14. aaOB19023B 



U21015O399 Foruard* IE Insp Repts 90-B59/B2-3B, 50-260/B2-29 & 
50-296/03-23 on B20S30-0903 Ho noncomp 1 lane e noted 
VERRELLEiD H Division of Project d Resident Programi 82/09/KO 
PrtRHIS, H O TennHssea Valley Authority 2pp 15704 029 24X 
Fiche 50-259, 82/09/20, 62101 50399 

--9210I5O40i IE Insp Repts &0-359/82-2B, 50-260/B3-2B t. 50-396/83-26 on 
E20B30-0903 Ho noncomp 1 lance noted Major areas inspected 
inserviiE Insp program * inservice testing program revieu 
OIRARD,E H , BLAKE. J Division of Engineering t Technical 
Prograns 82/09/16 4pp 1 S704 031 21X Fiche 50-399.32/09/20, 
E21 01 50399 

9310O10097 Approve* reviseil commitment dates for Item 29 of App C to 
IE tnsp Hents 50-259/61-19,50-260/81-19 i 50-296/B1-I9 fr 
Item C 3 of Aft & to ^ Insp Repts SO-259/B2-13, 50-260/B2-12 
> t SO-29A/B2-12 

LEWIBrR C Division of Project * Resident Programs B2/09/2H 
PARSES. H O Tennessee Valley Authority lp 15565 001 24X 
Fiche 50-259,82/09/22,8210010097 

8210OIOIO4 Rq,ue*ts eitension to respond to App G,Item 25 in IE Jnsp 
Rpta 50-259/81-19,50-260/81-19 (, 50-296/B1-19 & Item C S in 
IE Insp Heptt 50-259/82-12, 50-260/S2- 12 (< 50-S96/B2-13 
Responses uill b> submitted by B30101 & 821 I01i respec tively 
KILLS, L ri Tennessee Valley Authority 82/09/01 O'REILLYrJ P 
Region 2, Office of Director lp 19565 002 34X 
Fiche 50-2S9. B2/09/22. 8210010097 



S Reportable accurrencesi LERs d related correspondence 

B2I01S0129 Advise* of nd far in-depth evaluation of potential for 
unacc>ptaol > ' I nterac tion bettueen control rod drive sys & 
nnnessentlal control air syt Margin et safety inherent In 
licensed design basis should be promptly restored 

MICHELSON.C Director's Office BO/OB/IB DEN TON. H R pfficu of 
Nuclear Reactor Regulation, Director 3pp 15692 150 C4X 
Fiche 90-296, BO/OB/IB. B310120129 

8310070490 Discusses 810406 deliberate pump trip Control switch n 
manipulated for tuo trains of circulating water ii/s 
resulting In pump trip FBI & util Investigations failed to 
find culprit Ev*nt listed In safeguards watch list 
LAWINGiU D. Director'* Office 8I/0&/34 Director's Office. 

lp 15644 39B 34X Flch- 50-260, Sl/Oi/24, 8310070490 

821001000B Responds to FBIA request for 19 categories of documents re 
nuclear reactor evtnts h safety problems Koruards documents 
listed in App A, 

FELTON-J, M Division of Rules and Records, B2/06/2B UDELL, R, A 
Critical Mass Energy Project 15pp 15727.005 24 X 

Fiche- 50-000, BS/06/ae- 0210010000 



DOCKETED ITEMS 



BlO71ib007 i ; Informs that manipulation of control switches for tun 
of circulating uater sys re-suited in trippinn of tun 
circulating mater pumps locatid in intake structure PD 1 
Investigated fc Found no evi-dsr.ce of uho operated switches 
LWJNINOiW D Dlroctor's Office B1/Q6/34 nireclor'i Offic 

If 15727 250 24X Flche 50-000.62/06/28,0310010009 

9510360349 Forward* LEH S2-OP9V03L-0 

GREEN. H J Tennessea Vatleij Authority 62/1Q/19 a'flEILLV, J P 
FleoiQn 2, Dfflc* of Director !p 1 5903 347 34X 
Fiche SO-260. Ba/lO/! 1 ?, a21Q3i<X]49 



--B310360353 LEfi B2-039/03L-0 on B20951 , plnh o 1 a leak discovered in 3- 
fire protection line- supplying Uator to cable-trail fined 
water spray sijs CJntaed 6y through-uaH pitting corrosion 
attack UUvasonit testing to be done bij 030201 

KECKEtSEN.T TenninSBB Valley Authority 92/10/19 Region B, 

Office of Birector 3fp 15602 346 24X Fltha 30-360,02/10/19, 
B210-260349 



Hfl Hobinson rchmc*l 



321O06O334 "Radiation Shielding Analysis F 
Support Ctr /Emergency Operating Facility 

DRCDE.H U , IJATHrtN, S J . SCH1IDT, E R NUS Corp NUS-4L54 
B3/06/30 54pp 15,|i? 134 24XFictic 50-261, Q3/1O/O4, B21 CXV..9 J 



H Goneral corresp ondent B 



Requests IJRC direct all offi 
utll vice-prei ident. due to B30930 ret 
JOKES. J A CaroJina Power *< Liglt CD 
Office of Nuclear Reactor Regulation, 
Fithe SO-OOO, a3/'09/27, S21OOIO03S 



ial correspondence ID LK J 
rement a^ JA Jones 

03/01/27 DEtJrOM.H R 
Director Ip 15!)(,3 314 



B210l3032^ Requeats changea to distribution list For DUJIEQ-OOJO. 
"LicensciJ Operating Reactors - Status Summary Ropl " 
Zll1HERriAN,S R Carolina POUBT '- Ligfit Co B2/1O/11 MtrE-M f> 
A DP Sy-ate-ms Development Rianch 2pp 1 5683 361 24X 

FichB 50-000,32/10/111.6210130323 



92102*0417 Foruardt LEO B2-03a/03L-0 

OREEW-H J Tenncssea Va ! 1 eij Authority Q2/10/17 0'REILLV,J P 
Region 2, Office of Director Ip 1 SB06 150 24X 
Fithe 30-3AO. B2/10/S9, 3210260-117 

--B21&2604-16 LEFI 82-03Q/O^L-0 on 320921 , duping refuel 1 ng, turb i ne to 
reactor lililg doors 237 t, 23B opened t Imul taneoua I<J . brea I Ing 
tecondary c onta i nmen t Caused bu Folger rtdams Interlock lys 
failure due to loose door latch screw] 

TAVLOR. D Tennes9ee Valley Authority 02/10/19 Region 2. 

Office of Director 2p-p 13Q06 131 24 X Fiche 50-2&O, B2/ 10/ 17. 
9310260417 



T Hearing transcripts on non-ant L tros t matteri 



B210070133 Testimony of JW Hutton answering ASLftD questions 
level raduiaite itgt options Availability of adequate space 
to dispose of law level w.istos in neit S yr i uncertain 
Certificate n f Svc end 

HUTTOlhJ u TanneMoff Va H c-ij Authority 62/10/01 12pp 
15627 031 24K Fiche 50-337. B2/10/0-1 . Q510O70133 



DOCKET SO-3&1 H D RQ3INBDM PLANT, UNIT a 

F Security, medical, aner^encij t< fire protection plan 



82 10250202 Foruarils itenflTia for S2101-1 small-scale omorg encij 
prrparedneaj eierclae 

ZJKnERMfiN.S R Carolina Pouier t Light Co 02/07/OH STOHR, J P 
Division of Emergency rre-pareilntis d Dpsrational Support Spp 
1378Q S72 21X FichH SO-Sfil. H2/09/OE. B31O2S0203 

6310150396 Fo-l-uaril* IE Inspi Rep t 50-2t,l /BZ-S'i on 830014-19 No 
none amp] 1 a nee noted 

LEWIS, R C Division of Prajucl t, Reildont Fragrant BH/0 1 ?/!? 
JQHfQ, J A CaToltna Pouer !, Light Co app 1S701 033 2-H 
FUhB 30~2il, B3/09/I7, B21015Q396 

--9310150101 IE InBp Rept 30-2M/B3-29 on B30016-19 No noncnniji 1 ionea 
noted Major araai Inspected rAdioluglcal tmcrgencY 
prepare>dnes s 

CLIHE.H E , JEMKfNSiO R Division of Emarjency Prsaaredness 6 
Operattonel Bupport Sa/07/lfi ISpp 1 370il 037 24X 
Fithe 90-2it,flS/fl9/t7, BSI013039A 



Qperat I no lit 



stage documents 



6210080015 Addl response to FQ1A request for 19 categoriei D f Info 
nuclear reactor events ( safety problems Foruards documshtt 
listed in rtjip A Documents tn App B completely withhold Iruf 
FOIfl Eieraption 5) 

FELTU/i. J M Division of Rules and Records Q2/O7/12 UI>blL,R 
Critical Mas* Energti Project ?pp I S665 037 2rtX 
Flc^e 50-OOO, S2/O7/J2. 



--BlOi2201&5 Provides results of discussion u/licensee TB appdrsiH 
pToblem u/proper sealing of containment purge valves 
Licensee estimattd that eicessive leakage condition occur rut 
at freijuencij nf one tsnve for every five valve cycles 
DAMCE.N C ffegion a, Atlanta. Office of tho Dirsctc-r 7H/ I 0. 

^DRDAN. E L Division of Reactor Operations Inspections i?pp 
1566S 1A5 34X Fiche 5O-OOO, 8P/07/ 12. Q2IOOB0015 



13210070007 Responds tn PDIA request for 



ight categi 



steam geiieratnrs t< it earn turbines App A documents provided 
in R Udell FOIA Request 81-313 Forwards documents listed n 
App D 

FtLTQK.J H Division of Rules and Records 82/CWIO 
Uintfirop. Stimaon, Putnam * Huberts 9pp 15643 063 
Fiche 50-OOO. Ba/08/IO. B21O070007 



tOIJO. O J 
MX 



D207160044 FQIA i-oqujst for all Internal non-public dnrumortl. u na 
evaluation reptu & other mabl dealing u/nuclear pl^nt 
opera* i ona 

KCIN"1S,D Neuis & Observer 92/08/17 Office Q F Adminii t TL 

Ip 15B60 O6d 24X Fiche 50-000, 82/00/1 7, 02O7IR0014 

02102B0013 Reaponds to FOIA request for all i nternal, non-pulil 1 1 
tfocumentsi memos, evaJua tion reptj other rnstl dealing u/ 
nucle-ar plant operations Faruarda documents listed in App H 
FELTED. J H Division of Rules and Records 02/09/17 HCIHHIh 
New* fi Ooerver Spfl I 5BAO 065 24X Fiche 50-000. OZfOVf 17, 

B2102G0013 

7900130694 Recommgnds. licensee be requested to submit lalid tili. 
process control program d offcite dase calculation (nariudl to 
aid in timely revieu of radiological effluent lech Spoct 
Foruat dt guidelines 

COLLINS, J T Effluent Treatment Systems Branch 79/06/31 
SCHWEUCER, A Operating Reactors Branch 1 (Pru 771030] IDpp. 
15960 072 24X Fiche 30-000,02/09/17,0310200013 



11070101-40 Ma rked-up memo re Q 10323 engineering evaluation rrpt tr, 
010129 RCS leak Event I TBcummendat inns will fac taken into 
consideration for Further evaluation Info has been 
transmitted to utils 

DENTCN.H R Dffica of Nuclear Reactor Rogulation. Dlv<(lor 
SI/06/15 MICHELSDN. C Director's Office 3pp 1SR60 S3t l 
Fich SO-OOO.SS/09/17, 8310260013 



I10BS70422 NoUfiea that ubll B01201 request far lieenn ju 
pent fuel pool storage eipanaion is acceptable Safety 
evaluation d E1A Itiput encl 

KREOER, W E Asiistant Director for Radiation Protectinn 
01/07/23 NQVAK-T Atsistant Director for Operating Rti 
6pp 1SB60 240 24X Ftche 50-000,02/09/17,8310380013 



31120aOB5B FoTtiiardi Input to afety evaluation ! EIA of propoul 
full pool torH8* capacity eipansion Evaluation & *pprl*il 
bated on Info provided in 801301 Itr Proposed mod 
actoptab la 

HOUSTON, R H Ace id ant Evaluation Branch, Bl/11/17, VAROA, s 
Operating R t actoT Br*ncd [ 3pp 15860 24i 24K 
Fiche. 50-000,63/09/17, 821oaB0013 



DOCKETED ITEMS 



57 



-0201,200650 Forwards technical evaluation of deviation in licensee 
B1O333 response to requ iremcn ts of NUHEQ-O737 Item II F 1-1 
Technical evaluation should be forwarded to licensee for 
jus t 1 Pica ti on of deviations 

JJREGER.W E Assistant Director for Radiation Protection 
81/12/15 NOVAK> T II Assistant Director for Operating Reactors 
2pp 15B&0 265 24X Fiche 5O-QOO. 82/Q9/ 17. B21O200013 



9210150198 Responds to 02O707 request for rep t documenting pressuriier 
power operated rellaf valvo I. pressuriier safety valve 
failures per NUREG-0737, Item 1 1 K 3 3 No failures or 
challenges identified from BIQ-401 to present 

ZIKMERMAN.S R Carolina Pourer & Light Co B2/10/O9 VAF1CA, B A 
Operating Reactors Branch 1 2pp 13707 271 24X 
Fiche 30-261, 82/10/06, B21015O190 



-t32O1.20'O6A2 "Add! Accident Monitoring Instruments t i on. " technical 
evaluation of response to Attachment 1 of Item II F 1 of 
MJREO-O737 Tun major deviations from requirements 
unacc ep tan 1 e 
HUCHrON.fi L Euon Nucleai Co . Inc (subs nf Euon Corp ) 



Ql/ I I/O= 



15960 ?t,7 24X Fiche 50-000.02/09/17,82102130013 



B2O322O5 1 4 Forwards safety evaluation ', EIA supporting util 020129 
request lo allou use of circulating uater pump discharge 
flou as backup source for dilution in calculating 
radioactive liquid effluent release uhen pump out of svc 
HOUSTON, ft U Assisfant Director for Radiation Protection 
B2/O2/26 IIQVAK, T M Assistant Director For Operating Reactors 
7pp 15CM 017 24X Fiche 50-000. S2/09/ 17, B2IO3B0013 



B21O190709 Foruards "Supplemental Info for Degraded Grid Voltage 
Analsi*'CP fe L.HE Robinson Nuclear Generating Station 
Unit 3 " in response to B10131 request re adoquacy of 
electrical distribution sys voltage 

EURY,L H Carolina Pnuar & Light Co 82/10/14 VARQrt, 8 A 
Operating Reactors Branch 1 3pp 15737 207 2flX 
Fiche 50-261,82/10/1-1,6210190709 

0210190720 "Supplemental Info for Degraded Qnd Voltage Ana 1 ij s i a, CP&L, 
HB Robinson Nuclear Generating Station Unit 2 " 
NARAYANI. I V , FIELDS, W W , CASEY, B J Ebacco Services, Inc 
(subs of Gnserch Cprp ) B2/09/30 209pp 15737 290 24X 
Fichu 50-261,62/10/14,6210190709 



H2Q5O5i>4HO Forwards audit of procedures & training for pressurued 
thermal shock Control room emergency procedures remain 
uplghted touard core cooling & do not go far enough in 
addressing pressuriied thermal shock issue 

I1AZETIS,.C R NBC - No Detailed Affiliation Given 82/Q4/15 
THOMPSON, H L Division of Human Factors Safety 30pp 15861 045 
21X Fiche 50-000, B2/09/17, B21O2BO01 3 

O209I501O& Provides requested add! info re 02073O pouer operated relief 
tai*.e blocV valva failure Maint errors made during previous 
activities listed 

BflOWH, E . LANNING,W u Reactor Operations Analysis Branch 
32/08/25 SEYFRIT.K V Reactor Operations Analysis Branch 3pp 
ISBil 34-J 3-1X Ficfie 50-000.02/09/17,8210280013 

--3210203042 Responds to encl E Urley 7B1229 request for extension to 
aubmit draft effluent Tech Specs Request unacceptable Util 
reason for eitensian not valid Draft Toch Specs must be 
iub-nitted by 790215 

COLLINS, J T Effluent Treatment Systems Branch 79/01/OB 
SCHUEIICER. A Operating Jleactois Branch I IPre 791030) lp 
15060 OB 1 ? ^4X Fithe 50-000, B2/O 1 ?/ 1 7, D2I O2S0013 

--82-KKSQQB2 "Dosimetrij Placement fni Steam Generator Workers " 
MARNnCtt, R Institute of Nuclear Power Operations 62/01/31 
13pp 1SB40 310 24X Fiche 50-000. B2/09/17. B21O200013 

Q210O1GQ51 Ac k receipt of 820S23 Itr requesting temporary relief from 
c o"ni tments re training of shift technical advisora Program 
approved ! request foiujrdeif to NOR for evaluation 

O'REILLV, J P Region 2, Office of Director 02/09/20 JPNES, J A 
Carolina Pouer & Light Co lp 1 53ft S 333 24X 
Fiche 50-000,02/09/20,8310010051 



6210260475 Application to amend License DPR-23. revisi ng Te^ch KpecB to 
clarify In-place testing criteria used on iaFetij-re lated 
HEPA filter sui fc compliance y/mare recent ANSI s td 
EURV, L (J Carolina Poujar t, Light Co 02/10/22 VARGA, S A 
Operating Reactors Branch 1 Bpp 15006 220 24X 
Fiche B0-2il. 02/10/33,6310360475 

8210260493 Proposed Tech Spec changes clarifying in-place tositino 
criteria used on saf ety-rela ted HEPA filter sys tt 
compliance u/more recant ANSI std 

* Carolina Poumr K Light Co 82/10/22 2pp 1 5806 230 24 X 
Fiche 50-2il,8S/10/Sa. 0210260473 

92I026090B Application for amend to License BPft-23, revising Tech Spec 
to clarify limiting conditions of operation ifor pressuriier 
code safety valvoi 

eURY.L H Carolina Pouier b Light Co 03/10/S2 VAROA. S A 
Operating Reactors Branch 1 2pp 15909 133 24X 
Fiche 50-261, 62/10/22, B21036Q500 

0210260511 Proposed Tech Spec 3 1 t 3 re pressurlior code safety 
valves 

Carolina Power & Light Co 02/10/S2 lp 15903 135 24X 
Fiche 50-261, aa/10/32. B2102i050a 

9310290358 Requests intension until 821215 for submltlal of schedule 
TMI Item II H 3, "Past-rtc c iden t Sampllnn By S " HRC 020924 
request for addl info significantly eipanded scape of uark 
ZIMMERMAN'S R Carolina Pouer i- Light Co 82/10/36 VAROA, S A 
Operating Reactors Branch 1 lp 15B53 04? 24X 
Fiehe 30-261. 02/10/3A,BaiOa90398 



O Inspection reportsr IE Bulletins t correspondence 



2|0 1 0197 Renuests addl info documenting linui each criterion of 
liUHEQ-0737, Ii-em II B 3. "Post-Accident Sampling Bus" ha> 
been satisfied, in ordHi to conduct post-implementation 
re/ieu Schedule requested within 20 daijs 

VAROA.S A Licensing Branch I 82/09/24 JONES, J A Carolina 
Pouer & Light Co lOpp 15976 247 24X Fiche 50-261, B2/09/24, 
6210290177 



8210070007 Responds to FOIA request For eight categories of records re 
steam generator! & steam turbine* App A documents provided 
in R Udtll FQIA Rfqueit B 1-313 Forward i document) listed In 
App B 

FELTOH, J H Division of Rule* and Records 93/08/10 LONG. D, J 
Uinthrop, Stlnnonr Putnam & Roberts 9pp 15645 063 24X 
Fiche 30-000,82/00/10,9210070007 



831005000^ Advises that response to 920310 request For addl info re 
rJLifIEG-0737, Item I! B I. "RCS Vents, " will be submitted & 
.nontbs 4 e- fore end of first refueling scheduled to begin In 
Dec 19B3 

EURV.L II Carolina Pouer >, Light Co 82/10/01 VAROA, S A 
Operating Reactors Branch 1 lp 156OS 192 24X 
Fiche 50-261,92/10/01,021005000? 

S2 10060013 Application to amend License DPR-23 consisting of revision 
to Tec& Specs providing three auiiliarij feeduater purapi 
operable prior to eiceeding HCS temp of 350 f 
EORV.L IJ Carolina Power t. Light Co B2/10/01 VARGA, S A 
Opirating Reactors Branch 1 2pp 15619 074 24X 
FUha SO-261, 92/10/01,8210060013 



031007013? Forward! tabulated data on steam generator Inap & malnt at 
facilities Data shoulif be provided to licensees 
IPPQLITOiT nperating Reactori Alignment Branch 82/01/01 
VAROA'Q Operating Reactors Branch 1. 9pP 15645 131 24X 
FiChS 50-000,92/08/10,8210070007 

9210070172 Foruarils irifa re steam generator intagnty ti Inflpa at all 
op*riting PWR, pir 7303HO & 21 requeiti Details of Intpi, 
Including defect Indicationi, tube ptugsin) criteria t- tubei 
plugged mill not be provided eicept for Paint Beach 1 
OQLLER, K R Division of Reactor Licensing (NRR-1975 only) 
75/03/24 MACCASY.fl R Division of Tachnical Review (NRR-197G 
only) Spp 1564S 196 24X Fiche 90-000.02/00/10,8310070007 



0210060016 Proposed revision to Tech Specs providinfi three auxiliary 
feeduater pumps operable prior to exceeding RCS temp of 
350 F 

* Carolina Power (. Light Co 92/10/01 Spp 15615 076 24X 
Fiche 50-361. 82/10/01. B2100600I3 



8210010173 Forwards IE fnep Rept 50-261/82-30 on 830810-13 No 
noncomp 1 iJnce not id 

VERRELLI.D M Division of Project k Resident Programs 62/09/09 
JONES, J A Carolina Pouier it Light Co 3pp 1S36B 132 24X 
Fich* 50-261, 82/09/08.6210010173 



82 IO1 &0264 Foruards addl info re plant-specific homogeneout numbar 
dentlties for matls >j fluid in reactor vessel core region, 
per 32(3917 request for info re pressurized thermal shock 
ZliMMERHAN.S R Carolina Pouer t Light Co 82/10/07 VAROA, S A 
Operating Reactors Branch 1 7pp 15703 254 S4X 
Fiche 30-261,32/10/07,0210150264 



0210010176 IE Imp Rcpt 50-261/82-30 on 820810-12 No noncomp 1 iance 
noted Major artai lnif>*cted post-refueling startup teats 
& closeout of earlier nforcemtnt item 

BURNETT.P T , JAPE, F Dlvitlon of Engineering & Technical 
Programs 62/09/02 6pp 1B36B-134 24X Flcha SO-261, B2/09/OB, 
B210010173 



DOCKETED ITEMS 



6310130396 Forward* IE Imp Rept 50-261/02-37 on 620616-19 No 
noncnmj) 1 ianc* noted 

LEWIS. R C Division of Project t Resident Programs 82/09/17 
JOtJES.J A Carolina Pouer tc Light Co 2flp 15704 035 24X 
FUhe 50-361., 33/09/17, B2HM50396 

92IOJ5G40I IE Imp Rept 50-261/B2-29 on B3QSI6-19 No nonccmplia 
notad Major artai inspected radi ul og lea 1 emergency 
prep-areifna* i 

CLIHE.U E j JENKINS, Q R Divliion of Emergency Preparedness 
Operational Support B2/O9/16 ISpp 15704 037 24X 
Fiche 50-261, 62/09/17. B310150396 



8210190240 Forwards updatad LER BO-027/OIT-1 

STARKEY", R B Carolina PDUJPF t Light Co B2/1O/1I O'RE ILLV. J I 
Rgion a. Office of Director Ip 19745 196 24X 
Flche SO-3 



--B3I0190244 Updated LER 90-027/01T-1 on 601 122, re laij FIT-9 in re 
protection train A failed to re-energile during periodic 
telt of reactor protection logic Caused by shorting of lead 
uire connection to call wires Relay replaced 

CDX,ff T Carolina Power J. Light CD 82/1O/11 Region 2, 

of Director 4pp 15742 197 24X Fiche 50-261.82/10/11, 
02101902-10 



62I0150-19-3 Reo.uei.ts addl info re util response to IE Bulletin BO-ll. 
"Masonry Wall Design " Info required bg 021133 to complete 
revieu 

VAROA.S A Operating Reactors Branch 1 BB/10/Q4 JONES. J fl 
Carolina Poiuir & Light Co 4pp 15717 271 24X 
Flcha 10-Eil. B2/1O/04, BSHH50493 

S20Q190233 IE Info Notice 00-35, Buppl 1- "Leaking t- Dislodged 1-125 
Implant Seed! " Bvc lit encl 

CDBB.L r Dlvlilon of Fuol Facilities, Material* 6 Safeguards 
83/10/06 Coniolirfated Edison Co of Ngu York 66pp 19761 250 

24K Fitn 50-OOO, 82/10/06, B30BI9O233 



6210290074, Forwards updated LCH S1-031/01T-1 

STARKEV.R B C*rnllna Pouor b Light Co 82/1O/22 
Rigion 2, Office of Director Ip 1 S9S4 Q3fl 24X 
Ftchs 50-361.82/10/22,8210290074 



D'RETLLV.J 



--6210290070 UpJatetl LEH BI-031/01T-1 on 81 12O1 , dur ing hot thutdoun. 
presturiier PORV block valve o>parators diif not fullij shut 
block valves Cauiad bij improper rasint Valves closed 
nanua 1 Ig 

COX.H T Carolina Power b Light Co B2/1O/22 Region a. Cffit 

of Director 3pp 159S4 029 24X Flchc 50-261,62/10/32. 
8210290074 



IE Bulletin B2-03, "Stress Corrosion Cracking in Thict- 
Usl i. Lirgs-Di amt*r, Stain 1 ifsi Steel , Rec Irrulatlon Sg 
Piping at BWR Plants " Svc list ncl 

DEVOUNO, R C Director's Office, OFfic* of Inspection and 
Enforcement 82/IO/L4 Conin 1 idated Edlsoci Co of New York 

H5pn, 15010 125 34X Flche 50-000.63/10/14,8303190238 

B21O220495 Act receipt of 621 DOS 1 tr informing MRC of steps taiun to 
correcb vlolationa noted in IE Jn*p Rept 50-261/62-37 
LEWIS, R C Division of Project 4 Hesldent Programs B2/1Q/18 
UTLEY.E E Carolina Power &> Liaht Co Ip 13779 009 24X 
Flche 50-261, 9E/10/1B, B210230195 



6210290333 Foruard* LER 82-013/03L-0 

STARKEV.R B Carolina Pouer & Light Co B2/10/23 
Region 2, Office of Director Ip 1 5B53 103 24X 
Fichu 50-261, B2/10/2S. H2I0390333 



O'REILLV, J 



-- 6210290339 LER B2-013/03L-0 on SS0923, svc uater pump A Failed U 
riitart following periodic to at Cauied by failed control 
pouier futes Fuses replaced d pump started b ratcsted 
COX.H T Carolina Power t Light Co B3/ iO/33 Region 2, ( 

of Director 3pj> 13033 104 24X Fiche 50-261,62/10/22, 
8310290333 



--0210520499 fiesiponds to NHC 83090S Itr re violations noted In IE Insp 
RBpt 50-261 /82-S7 Currectfve actions changes to plant 
operating manual included in permanent change book & 
operations revltlona statui list updated twice weekli; 
STARKEV-R B Carolina Pom.r t Uijht Co 83/10/00 O'REILLY.J P 
Region S, flffie* of Director 4pp 15779 010 SIX 
FUha 50-2il,B2/lO/ia. B-210230495 

8210220500 Forwards IE Insp Rep t 30-2M/B2-27 on 820711-0810 fc notice 
of violation 

LEWIS, R G Division of Project t Resident Programs 62/09/08 
JCWE3, J A Carolina Pouer & Light Co Spp 15779 014 54X 
Fiche SO-H 



DDCHET 30-263 HDNTICELLD NUCLEAR OENERATIHQ PLANT 

F Security, medical, emergency & Fire protection plans 



8210150395 Forwards IE Insp Kept 50-263/82-09 on 020703-0929 Mo 
none amp 1 ianc e noted 

STREETER, J F Division of Project t> Resident Programs B2/0<J/;>a 
LARSON. C E Northern States Pouier Co 2pp 15703 272 24X 
Fiche 50-363, B2/09/SB, 8310150385 



8210150-386 IE Insp Rent 50-263/32-09 on 020703-0020 No noncgnp I U 
noted Major areas inspected LER fol louiup. operational safety 
verif ication. fire protect ion/ prevent ion, securitg perannnel 
quail Hca ti ons, operator overtime U onslte review commlttoe 
EROHH, C H , MADISON, A L , WALKER, R Division of Project b 
Resident Programs 82/09/26 5pp 1S703 274 24X 
Ficne 30-263, 62/09/20, B210I5030S 



DOCKETED ITEMS 



~-B210QIOQ4i Proposed Tec ft Specs re surveil lance, reactor pro tec t inn 
iron i tor i ng sys, jet pump surva 1 1 1 anc e, orga nl la t ion I steam 
line area temp suited deviation 

Northern States Pouer Co 05/09/24 60pp 15565 IBS SIX 
Fichff 50-3B3. 82/09/24. 82IOQIO036 



821024O209 Forwards check to complete fee payment far Addendum 1 to 
8O1O10 license amend request 

MUSOLF, D Northern States Pouer Co 62/10/22 D1GOS, R H License 
Fee Management Branch Ip 15799 153 24X Ffche 50-363,83/10/33, 
8210260209 



21OQi0377 Forwards application for amend to License DPR-22,App A 

Amend changes Pages 207 >, 2O9 to remove 3-cycle per minute 

mm source range monitor count rate when tuo or fewer 
d>d jacent assemblies eiist in quadrant 

fHISnLf. D Northern States Pouer CD 82/09/30 Office of Nuclear 

tteactor Reflation. Director Ip 15615 340 24X 
Ficfce 50-2,63, 82/09/30, 82100A0377 

-6210060380 Application for amend to License DPR-22, App A Amend changes 
Paiges 207 fc 309 to remove 3-cycle per minute mm source 
range monitor count rate uihen turn or feuer adjacent 
as-s-enb 1 1*5 eiist in quadrant 

KUSOLF, D Northern States Pouer Co 82/09/30 4pp 15615 341 
24X Fiche 50-263,02/09/30.8210060377 

-B21OQAQ3B6 Proposed Tech Specs 3/fl 10. removing 3-cycle per minute mm 
source range monitor count rate uhen tuio or fewer adjacent 
as-semol ies eiist in quadrant 

* Northern States Pouer Co B2/09/30 3pp 15615 345 24X 
Flthe 50-263.82/09/30,8210060377 



Inspection report*. IE Bulletins t, correspondence 

0210030015 Addl response to FOIA request for 19 categories of info re 
nucloar reactor events & safety problems Forwards documents 
listed In App A Documents in App B completely withheld (ref 
FOIA Eiemptlon 5) 

FELTQN.J M Division of Rules and Records 82/07/13 UDELL jfi A 
Critical Mai* Energy Project 9pp 15665 027 34X 
Fiche 50-000,82/07/13.6210080015 

-S105380476 Request! that regions confirm licensee lubmittal of rept fur 
satisfactory imp 1 emantation of Item 4 of IE Bulletin 7"7-26, 
Ravi si on 1 

JORDAN, E L Division of Resident & Regional Reactor Inspection 
Bl/05/18 CRIER, B H Region 1. Philadelphia, Office of the 
Director (81/O3/01) O'REILLY.JP Region 2, Atlanta. Office of 
the Director (81/O3/01) KEPPLER, J Region 3. Chicago, Office 
of the Director (81/03/011 Ip 1 S668 130 24X 
Ficho 90-000.82/07/12,9210000015 



S21Q] 3O261 Submits add! info re application For single loop operation 
licence amend, In response to HOC 830920 request MAPLHGR 
reduction factors reviewed by OE & found applicable to 
Cutle 1O 

MU5GC.F, D Northern States Power Co 82/10/O5 Office of Nuclear 

Realtor Regulation. Director Ip 15676 014 34X 
Ficfie 50-263,82/10/05,8310130261 

e21Ol3O2tO Discusses implementation of NflC guidelines for worling 
FiourSi provi ried in Generic Ltr B2-12 Revised 1 guidelines have 
been imp I cmen ted, tu/e icep t i ons of 72-Ji per uk limitation !i 
relief from control ftoard duties 

HtjSOLF. D Northern States Power Co 82/10/07 Office of Nuclear 

Reactor Regulation. Director 2pp 15676 013 24X 
Fiche 5Q-000, B3/1O/O7, 021OI3026O 

6210150-364 Forwards response to request for info In Sections 3 it 2 3 
of Oeneric Ltr S1-O7 re overhead handling ays Revloed 9 
month subroittal. "Control of Heavy Loads" & review of 
special tifing devices also enc I 

r-,USULF, D Northern Stales Power Co 02/10/11 Office of Nuclear 

deaclor Regulation. Director I6p 15715 103 24X 
Fiche 50-363. B2/10/1 1, 83101 5O364 

B3IOI5O377 "Evaluation of Conformance iu/NUREQ-0612 for Dryuiel I/Reactor 
Ve*el Head ! Dryer/Sepal ator Sling Lifting Devices " 
BMITIJ.SH . VQGEL, T N NUTECH (Nuclear TechnoUfly, Inc ) 
H3F-77-Q08 83/09/29 Hpp 15715 118 24X 
Fiche 50-263,82/10/11,8210130364 

--8310150500 "Design Spec for Reactor Vessel Head Lifting Device " 
FISCHER, L , VOGEL, T N . SMITH, J K NUTECH (Nuclear Technology, 
Inc ) NSP-77-OQ1 ROO S2/O9/H4 9pp 13715 132 24X 
Ficfie 50-263,82/10/11,0210150364 

B31O15050") "Evaluation of Selected Special Lifting Devices for 

Compliance u/NUREO-0612 " 

SMITH, JK , VQGEL. T N NUTECH (Nuclear Technology, Inc ) 
hSP-77-007 ROO 82/09/24 I2pp 15715 141 24X 
Flcfie 50-263,82/10/11.8210150364 



821015O3BS Foruardi IE Insp Rept 50-263/82-09 on 820703-08S8 No 
nan camp 1 la nee noted 

STREETER, J F Division of Project tc Resident Programs 02/09/30 
LARSON. C E Northern States Power Co 2pp 15703 272 24X 
Fiche 50-263, 83/09/28, B2101903B5 

--82I01503B6 IE Insp Rept 50-263/82-09 on 820703-0828 No noncompl ianco 
noted Major areas impacted LER fol loiuup, operational tafaty 
verification. fire protec tion/prevention, s ecuri ty personnel 
qua 1 i f icati ons, operator overtime & onslte revieui committee 
BRQUN.C H , MADIsgN, A L , WALKER, R D Division of Project & 
Resident Programs 82/09/28 5pp 15703 374 24X 
Fiche 50-263.82/09/28,8310150385 

82I013O166 Confirms plans for 921014 meeting in Olen Ellyn. IL to 
discuss proposed corrective action for cracks In welds 
on indcap of rec irculation Loop A 

SPESSARDi R L Division of Project d Resident Programs 82/10/05 
LARSON, C E Northern States Pnuer Co Ip 15673 053 24 X 
Fiche 50-263, B2/IO/05, S210I30166 

820819D233 IE Info Notice 80-35, Suppl 1, "Leaking & Dislodged 1-125 
Implant 8eeds " Bvc Hit end 

CODG. L I Division of Ful Facilities, Materials Si Safeguards 
82/1O/06 Consolidated Eifiion Co of He a York 66pp 13741,390 

24X Fiche 50-000. 82/10/06, B209190233 

020819O238 IE Bulletin 82-03, "Stress Corroaion Cracking In Thlck- 
Wa 1 1 1 Large- Dl amateri Stainless Steel, lieclrculati on Sys 
Piping at BUR Plant* " Svc list encl 

DEYQUNO.R C Director's Office, Office flf Inspection and 
Enforcement 83/10/14 Consolidated Edison Co af Hew York 

115pp 15810 123 34X Fiche 50-000,02/10/14.8308190239 

82102S0320 Confirmatory action itr re actions util uill undertake as 

result of 821014 meeting at Region 3 ofc re crack 

indications found on uelds on rec irculetion sys piping 

KEPPLER.J 0, Region 3, Office of Director 02/10/19 LARSON. C E 

Northern States Pouer Co 2pp 15790 224 24 X 
Fichu 50-363,02/10/19.0210250330 



B31O15Q509 "Design Spec for Dryer Si Steam Separator Sling Lifting 
D-evice- " 

FISHER, L . VQGEL.T N . SMITH, J K NUTECH (Nuclear Technology, 
Inc ) N5P-77-003 ROO B2/09/34 9pp 15719 153 24X 
Ficho 50-263.82/10/11,8210150364 

B21O19O479 Informs that control room & technical support ctr 
habltabU itu *y* mod, per NUHEQ-0737, I tern II D 3 4 will be 
delayed until S30515 due to need for denon work, untimely 
naEI delivery & low productivity Revised schedule encl 
MUSOLF. DJ Northern States Power Co 82/10/13 Office of Nuclear 

Reactor Regulation, Director 3pp 157-10 263 24X 
Flche 30-263,82/10/13,8210190479 

9310350320 Confirmatory action Itr re actions util will undertaha as 

result of 021014 meeting at Region 3 ofc re crack 

indication* found on welds on r selrculation sys piping 

KEPPLER, J Region 3, Office of Director 82/10/19 LARSON, C E 

Northern States Power Co 2pp 15790 224 24X 
FUhe 50-263.82/10/19,0210350320 



8 Reportable occurrences, LEfts b related correspondence 

8310150174 Forward* LER B1-020/Q3L~0 

MAYER, L Northern States Power Co 81/08/24 KEPPLER.J 0. 
Region 3, Chicago, Office of the Director (81/03/01) Ip 
13707 193 24X FichB 30-263. 81 /OB/24, B2101 50174 

8210150180 LER B1-020/03L-0 on 310724, main stream leak revealed in 
drain line ta condenser Caused by piping leaking immediately 
dounitream of 43 degree elbou due to eroeion It impingement 
resulting from steam fc uater flow from restricting orifice. 
TOBIN.P A Northern State*. Power Co Bl/08/34 Region 3i 

Chicago, Office of the Director (81/03/01) Ip 19707 194 24X 
Fie he 50-263,01/08/24,8210130174, 

B2100SOIB2 PNO-II1-S2-103 on B20929, rad ic-grap h of recireulation loop 
cap A revealed four cracks extending from weld root into 
adjacent heat-if f ec tad lone Mo through-wall cracking 
evident Repair procedures und'er evaluation 

WALKER, R , JORDAN, M Region 3, Office of Director 82/09/28 Ip. 
1S603 344 24X Fiche 50-263,82/09/28,8210050162 



DOCKETED ITEMS 



9210130396 F^nu IE i**t .tt so-atuez-a-J 

^n'r'Si^r, of Fr^ct H.,-.n. Fr.jj.-. 
JWEB.JA C*ToUMPWt tLljM O 2 " 1570403 
Fichi 50-261. 8J/09/17. 8210150396 

-6210150*0! IE IW S*P* 30-361/63-2? " 620616-19 Wo nincQMUM 
nti* Major *r.s In.pettil rai.i.iE.l ,nta*nc v 



a. rational Support 82W1* 19P 
Ftche 50-341. 88/09/17. B2I01503W 



9310190240 Forwards updated LER BO-037/01T-1 

STARKEV.R B Carolina Pauer t LlBht Co B3/|(>/11 Q 
Recion 3. Office of Oiroctor lp 13J"42 I'M .MX 
Fichu 50-261, 22/10/11,8310190340 



--8210-190244 Updated LER BO-027/01T-1 on GUI I J, rUy "t V ,- "' 
(ratectian tritn A failed (o re-enorij i iu during pfrisiiic 
ttt of ractor protection logic Caiisud t n vh|jrlin( e t Ui' 
uire tonnaction to coil uires Relay rcpl.icod 
CQX'H T Carolina Poiuer !. Light Co [13/10/11 l!i|u~"" 

Df Director flPP 15742 197 2-1X Fich* HO ,'M, Hj/ [0. II 
831 01 90240 



aJdl info re u* ' 1 response to IE Bulletin 90-11, 
n - Inf. roquirfrd by 



A Op.r.t.ng BMtUr. Branch 1 
Carolina Pou.r i Llaht Co 4pp 15717371 
FUht 80-261. HB/10/04.G2I0150493 



JQ(fES ' 



B30BIWB33 IE Ufa Notice 8O-3S. 



1. "UaUr. B * Dislodged l- 



v 

B3/1Q/06 Consolidate Cd(n Co of 

24K Flch 50-0 



8210290074 Forwards updatoo LER 

BTARKEV^fi B Carolina Poiuer (, Light Co 
R*glon 2, Office of Director lp 193 
Flche 30-2S1, B2/10/23. 0310290074 



6310290070 Updated LEU S1-031/OIT-1 on Bl 1901. dm th<g n I 
(rea<uri>Br PQHV black valve operator! did nut It'lJ^ i 
block valve 5 Caused dy improper maint V<lvu iU<it| 
ruriuai Ii; 

COXhM T Carolina Poiuer & Light Co UJ' Kl/J.' li 

of Director 3pp 15854 OK9 3flX Fichu 10 J6J,(i.^]i 



B20ai-!Oa3B IE tulUtfn B2-03. "Btr S 



on Crt ing in Thicl 



, 

Piping at BUS Plant* " Svt Hit "=V 

DEVOUNO.H C B*cti"i Of*<. 0". o Inspection >* 
Eftfort-nt BB/IC/U Com olldated EJlsonCo of MeuVorfc 

i MK Fi.n. 50-000.62/10/14,0308190233 



BS10220493 AcK r.t-ipt *f 021008 1 fer informlnfl MRC of iteps tlm to 
correct vl.lli*i>i notad In IE Insp R*pt 90-261 /SB- ?7 
LEUIB.R C Dtvl.i<m ttf ft.^t ""* ^^SVrw 1 
UTLEV.E E Carolina PDI^BT i Lljht Co lp 13779 009 24X 
Fiche BO-261. 92/10/13. 82(0220'! 9 5 



3210-590333 Foruarils LCR 82*01 3/03L-0 

STARHEY.R B Carolina Power Si Light Cu HV/ltiS-r' 
fiBoion 3, Off let, of Director lp 15E1SJ 101 J4i 
Ficho 30-261,62/10/22. B2I0290333 

0210290339 LER 62-013/O3L-0 on H209H3. SVL u*tir pn 
rt ft Art following periodic teat Cauioil bij fall*) 
power fuses Fuses rnplaced & punip ttjrluJ t. ula 
CQX'H T Carolina pouer S- LM'it Co HJ/ 10/J^ 
or Director 2pp 13Q53 104 SIX ritbt fill Jt,l, 
8210390333 



? fiespondl to KftC S309QB Jtr r violationi noted In IE Inap 
R.pt 50-261^63-37 Corrective actiom thangea to plant 
oosiatlnj runual incluileiJ in permanent change toirlr 6 
O priiton r.vi.lons .t4tu* Hit updated *"*** tlI W n , Dlr ,, . )p 
BTMKEY.R Carolina Power (. Ulght Co 02/10/OQ D'REltLV.J P 
n*?in 2- Olflct of DlfBctor 4pp 13779 01O 24X 
Flehr 50-861, BanO/lB. 8210230495 



Rept 50-Eil/B2-27 on OH0711-OB1O t. notice 



8210^205(30 Fotur.^* IE 

a c ""oivislan of Proj*ct i Resident 
. A Cal-ollna Powr t> Llht Co Stt 
Fiche,50-S6l,aa/lO/fB.fl310220495 



ogr-am* B2/07/OH 
15779 014 24X 



-B21022050I Notle* of violation from insp on 620711-0310 
Bullion of Prajtt !, Resident Program &3/09/OB 
15779-01A 24X FiKha 90-261- BS/lOflB.B3W32f>W5 



iff 



6310320504 IE In*P Rpt 50-2&1/S2-27 on 820711-0310 lion ( omp li ante 
notad adttuatf, review procedures not imp! minted for ftilnt 
procedure MPI-10 for lafetu'felated Instrument valv 

UElSE.s", BUROEfl.C Division of Project k Resident ''''Ol'-ams 
82/09/02 lapp- 0779 013 24* FUtie 50-261,82/10/13.9210220499 

R Periodic operating reports t, related corroipondEnee 

9210130242 Forward* monthly operatlna rept for Bept 19S& 

STAFWEY.R B C.rolina Power ft Lloht Co 02/lQ/OB &EVOUMO. R C 
Qtretoe' Offic*' Office of Intfectlon *nd Enforcement lp 
I5A7B OP6 24X Fithe SO-B61. B2/1 0/09,031 01 3024B 

8210130244 Monthly operating npt tor Bipt 1982 

NORRtS.HR Crallna PUT (. Light Co B2/10/03 3pp 
18678 097. 24X Plena: 50-261 , 32/10/06.821 0130242 

3 Reportage onurrences. LEFi b related correspotidenie 

B2iQBa026S Forward* LER B2-OI2/03L-0, 

STARK.EY.R.B Carolina Power b Light Co B2/10/OA D'REILLV.J.P 
H.jion 2. Offici- af Director, lp. 15776 B02 S4X 

BS10220S67 LCR 83-Oia/03L-0, on 820<!06,t 94X power, latdcun rrllef valve 
CVC-3O3 llftid t uould not rr*aat Caintd by w(er hamntr 
UJ* to ap4T*tor trror in realignment of charging pump fron 
rtclrculiUon la normal opratlon. Operator counseled, 
COK, K. T. Ciroltna Pouir fc Light Co 32/10/06 _RsIon 3, Office 

of Director 3pp 13776203 24X flche 30-Sf.l, I 
3810330869, 



DOCKET 30-263 MONTICELLD NUCLEAR QENPIATKW I't ftlH 
F Securitui medical, amergcniy t fire protocUon 



B210150335 Fruards IE Insp Rept 30-263/Oa-OV on ll.'itA h 
none om pi lane a noted 

STREEren.J F Division of Project t> ntldtnl t'uijn**. 
LrtflSOtf.C E f/orthern State* pouor Co 2pp O/i'i.*, 
Fiche 30-243, 02/09/23, Q2I 01503B5 



BSI01&0396 IE Insp Rept 50-243/82-OV t,n UM /ill l-K.il 
no(i( Major arei inpacted l-ER f ollauup, aim tl H i 
veri fic^tioni f ire protec t ion/prevnn 1 1 un. *i t I li 
qual if icatl on*i operator overtime fc onilte I tv 1 1 j t .. 
DflOWWiC H . rlAOISQN, A L , WALKER, R D 1)1 vl t lur. u 
RnUent Program* 32/0-7/aa 5pp 13/0 I JM .< 
Flc^e 5-0-263. 03/09/33.0210130305 



32102-60190 B*nueti that R HaUer OB addd lu I 
to provide for uncorted acc to vlt#l t a 
HEPPLER.J Region 3. Office of Director 
Nortnern 3tat. Pour Co lp 13799 160 J 
82/10/30, 



P Operating license tage documents li corripOMii-[ i 

B210040003 Responds to H20B2S I tr re spent lul r . ...... ^ 

nutlficat ion rea.u(rmahts of *hlpmnntt o* I rraduiiif ' M ' 

fuel contained In 10CFR73 37 

KEHCZEBjM B RejJon 3i Office of Dlractor HjjUilm ;* * 

Minnesota, State of 2pp 13577 26? 8AX MiM ' .4 1 t.' 

8310040003 



0210010060 Forwards modified Info to B20907 iuppUm n 1rl ">* < 
60(008 license amend request 

MUSDLF.D, Northern State* Poutr Co Da/Of/JJ <**i.i'! 

RtactoT Regulation, Director 13pp 13347 19* "i 
Fteh 30-263,812/09/83,8210010060 

8S10010036 Forutirds proposed amend to Llcente DPfl W (Ji'a 
Sneci In areas of *urveU lance, reactor pt*t*Hl *>'!'' 't 
sus, jet pump surveillance, oroan 1 latlon k lt* M' '*** 
temp twitch deviation 

MUSOLF.D Northern States Power Co B2/09/B* tt*tinivi 

RMctor Rvgulatlon, Director lp ISS&5 |M 3^' 
Flche- SO-263, 92/09/24, 8310010036, 

3210010041 Proposed amend to LUent DPR-aa^ **>! "* *- **' 
ar*t of surveillance, reactor protettian **HTin m- .*i 
pump surveillance, oroniitlon t tna lHi ** **** 

u Itch deviation 

HUSDLF. B Northern Statel Power Co B3/OVJ-* - - 

S4X FlcJK'BO-263, 82/0-P/24I8BI 0010036 



DOCKETED ITEMS 



59 



-921001OO46 Proposed Tech Specs re lurvs 1 1 lance, reactor protection 
man I ^ur ijig spjs.jet pump surve 1 1 lane ei organi lation & steam 

Northern States Pouier Co B2/09/34 fiOpp 15565 1Q3 2-!X 
Fiehe 5O-263, ea/D'9/34. 8210010036 



9210260309 Forwards check to complete fee payment tor Addendum 1 to 
001010 license a maud request 

MUSOLFj D Northarn State* Power Co 82/1O/23 DIGOS, H M License 
Fee Management Branch lp lS7ff i 5S 24X Fiche 50-263,82/10/35, 

BZI0260ZO9 



a210O60377 Forwards application for amend to License DPR-32.App A 

Amend changes Pages 207 'j 209 to remove 3-cyclo per minute 

mm source range monitor eg tint rate iirhen two nr f euier 
adjacent assemblies eiLst in quadrant 

1USOLF, l> northern States Pouer Co 03/09/30 Office of Nuclear 

Reactor Regulation. Director lp 15615 340 24X 
Fiche 50-263. EJ2/09/3Op 8210060377 

B2I006O3BO Application For amend to License DPH-33.App A Amend changes 
Pages 207 ( 309 to remove 3-cycle per minute mm source 
range monitor count rate when two or feuer adjacont 
assent I te-s emt in quadrant 

r-uSOLF. D Northern States Power Co O2/09/30 4pp 1S613 341 
2'IX Fiche 50-Si3, 92/09/30. B2lOQi0377 

B2100i03Bii Proposed Tech Specs 3/4 10. removing 3-ccle per minute min 
source range monitor count rate uhen tuo or fewer adjacent 
assemblies enst in quadrant 

* UoT'hern States Pouer Co 83/09/30 2pp 1361S 345 34X 
.Flclip 50-263. B2/09/30, Q3I0060377 



Q Inspection report 5. IE Bulletins &. correspondence 

B31OOB0015 ArJdl response to FOIA mqueit for 1*? catenaries of Info re 
nuclear reactor events & safety problem Forwards tfocume-nta 
listed In App A Documents in App completely mltJiheld (rqf 
FQIA Eiemptinn 5* 

FELTQN. J M Division of Rules and Records B2/O7/1H UDE4.L.R A 
Critical Mass Energy Project If p 15&A9 027 24X 

Fiche 50-QOO, S2/07/I2, B2IODS0015 

-6103380476 Requssts that regions confirm licensee submittal of rpt for 
jatiafactory implementation of Item 4 of IE Bulletin 79-24, 
Revision I 

JORDAN. E L Division oP fie 5. 1 du tit 1 Regional Rede tor Inspec t ion 
81/05/18 OR1ER.B H Region IP Ph 1 lade I ph ia, Office of the 
Director (Bl/03/01) D'REILLV.JP Region 2, Atlanta, Office of 
the Director (B1/O3/01 ) KEPPLER, J Q Region 3. Chicago, Office 
of the Director <S1/03/01J lp 1 5668 130 SAX 
Firhe 50-OOOi 82/07/12. 0211308001 3 



aaiO13026] Submitj addl info re application fo\ single Ipop operation 
license nmetid, ltl response to HflC 820920 request HAPLHGR 
reduction factors reviewed bij G te Found applicable to 
Cyfl? 10 

MU5DLF, D Northern States Pouer Co SS/IO/OS Office of Nucloar 

Reactor R&gulatinn. Director lp 15676 014 24X 
Fiche 5O-263, 02/10/05.8210130261 

B210I3D2&0 Discusses implementation of NRC guidelines fur working 
hours, provi de ri In Generic Ltr 93-15 Revised guidelines have 
beon imp I emen ted, u/Hicep t loni of 72-h per uk limitation t- 
relief from control board duties 

MUSOLF. D Northern States Pouer Co Q2/IO/O7 Office of Nuclear 

Realtor flegul ation, Director ^pp 15676 012 34X 
Fiche 50-000,132/10/07,3310130360 



Forwards response to request ror info in Sections 3 2 !< 2 3 
of Generic Ltr 01-07 re overhead handling sys Revised 9 
month suBmlttal, "Control of Heavy Loads" it review of 
special lifinj devices also enc 1 

MUSULr, D Northern States Poiuei Co 82/1O/11 Office of Nuclear 

Reactor Regulation, Director li,p 15718 102 34X 
Fiche 9O-263, B3/10/H. 021015036^ 

-K210I50377 "Evaluation of Conformance u/N(JREC-06ia for Dryuul 1/Reac tor 
Vessel Head !, Drv*f/Sepai ator Sling Lifting Devices " 
SMITH, S K . VOGEL, T N NUTECH (Nuclear Technolngij, Inc ) 
NSP-77'OOB 82/09/29 |4pp 15713 I1B 31X 
Fiche 5O-263. 02/10/11.8210150364 

--8310I50500 "Design Spec for Reactor Vessel Head Lifting Device " 
FISCHER. L . VOGEL, T N , SMITH, J K NUTECH (Nuclear Technology, 
Ine ) NSP-77-OOI ROO 82/09/24 9np 15715 132 24X 

Fiche 50-363,02/10/11. B210150364 

B2IQJ5Q50'J ''Evaluation of Selected Special Lifting Devices for 

Compliance u/NUREG-0612 " 

SMITH, J K . VOOEL. T N NUTECH (Nuclear Technology. Inc ) 
NBP-77-OO7 ROO 93/09/24 ISpp 15715 141 34X 
Fiche 50-263.82/10/11-8210150364 

--8B10150509 "Design Spec for Dryer li Steam Separator Sling Lifting 
Device " 

FISHER, L , VDOEL.T N , SI1ITH, J K NUTECH (Nuclear Tdchnolony, 
Int ) NSP-77-003 ROO 82/09/24 9pp 15713 153 34X 
Fiche 90-263,BS/1O/1I.B210130364 

621019047? Inforini that control roam & technical support ctr 
habttabi 1 itu. sijs mod. per NUREG-0737, Item II D 3 4 ui 1 1 be 
delayriJ until 830515 due to need for deugn inorki untiffli ly 
rnatl delivery & lou productivity Reviled schedule end 
rtl/SOt-Fp D Morthern States Pouer Co 82/10/13 Office of Nuclear 

fljjclor Regulation, Director 3pp 1574O 263 24 X 
fiche 3O-363, B2/10/13. 8210190479 

8210350330 Conf inflatory action Itr re action* util uill pjndrt*U as 

res-ult of 831014 meeting at Region 3 oft re crack 

indications found on ueldi on rec irculation *ys piping 

KEPPLEfi.J O Rigion 3. Office of Director B2/10/19 LARSON, C E, 

Northern Statts Pouer Co Spo 13790 321 24X 
Ficha 5-0-263. B2/IO/I 1 ?. S2I0250320 



6310150395 Forwards IE Insp Rapt 50-263/62-0^ or Ha0703-OBa0 Wo 
noncomp j i ance tinted 

STREGTERj J F Civilian of Project S. Resident Progranu 
LARSON. C E Northern Statas Power Co 2pp 1 57O3 &7S 3Af 
Flche 50-E63, 83/O9/2S, 8210150385 



IE Imp Rapt 50-2A3-/B2-09 on B20703-082B No roncomp 1 ianco 
noted Major ar-ea* Inspected LER fol 1 oiuup. opeTational Jfotij 
verification? fire protection/prevent! on, 1 e CUT I by personnel 
qualificati on* operator overtiim* fc onslte revlaw commi tte;n 
DfiQWH.C H , MADISON. A L , UALKER.lt D Division of Project & 
Resident Pro era mi B2/O7/2B Spp 157O3 274 SAX 
Ficho 30-263, SB/O-J/aB. B210I503B5 



B3iO|301i)6 Confirmi 



for 021011 meeting in Olen Ellyn, IL to 



discuss proposed corrective action for cracli in uieti)*- 

an indcap of reel rculation Loop A 

SPEBQAHD.ft L Division of Project tc Resident Program* 32/10/05 

LARSON, C E Northern States Polnor Co lp 15A73 053 S4X 

Fiche 30-263, 92/10/OS, 92IOI 30JA6 

0209190333 IE Info Notice 80-35, Supp 1 1, "Leaking fc Dislodged 1-125 
Implant Stdi " Svc list encl 

CODD.L I Oiviiicn of Fuel FaellitlBs, Materials & Safeguard! 
S2/ 10/06 ConiollciaUd Edison Co of Ham Vor k tApp 1S7&1 330 

24X Fiche 30-000.63/10/06,8208190233 

6308190338 IE Bulletin 35-03, "Stress Corrosion Cracking in Thick- 
Uall'Larg-Di moteri Stain leas B tnel p Ret irtru lation Syt 
Piping at HWR PUnti " Svc list nel 

DEYOUNO, H Director'* Office. Office of Inspection and 
Enforcement 82/10/14 Con-io-1 Iriatcd Ed i ion Co uf Neu York 

H5pp 1BB10.123 2-1X FJchrt BO-000,Qa/10/14,B20B19D33l3 

0210230320 Confirmatory action tic re actions util uitll under tain as 

result of 831O14 meeting at Region 3 oft r crack 

indication* found on MB Ids on r ee irculation sys pipinfl 

KEPPLER.J O fteglon 3j Office of Director 58/10/1? LAIRBON. C E 

Northern SUt.l Puucr Co 2jip 15790 24 24 X 
Ficht 50-263. B2/10/1 1 ?. B31025O320 

8 Reportahl* occurrences, LERs b rolated -corr-eipondenc t 

S210190174 Forunrtfs LEU 81-02O/03U-O 

HAYEfi, L Ncrtharn BtJtns Pouir Co el/OB/24 KEPPLER.J O. 
Region 3, Chicago* OfUcf at th Director CB1/OG/OI) [p 
1S707 193 BIX Flchn aO-3AS.BI/Oa/atiBB10l3O171 

B2 101 SO 180 LER B1-030/O3L-0 on 810734, main steam leak r live* led in 
drain lini to condenser Cjuisd by pip Ing leaking irnmdiotlij 
douni tmam of 43 dagrn* elbow tua to rasion Sc impingement 
resulting from steam * tuater flow from raitricting orffic* 
TDBIWpp rt Kortharn 6tatt Pouiar -Co 91/09/24 Ragion 3i 

Chlcigo, Office of tli* DiTtctor (B1/03/O1) lp IS707 194. 24X 
Fiche 50-263,81/08/24,8210130174 

02100501132 PNO-II1-B2-103. on 820928, rail logrjph* of reclrculatl on loop 
cap A rave* lid four cracks iitri)ing from u)el<T root Into 
diacint hvat-affected lone. Mo through~ual 1 crack ing 
aviilent Rap*ir proc*t/uret under evaluation 

WALKER, R , JORDAN, H- Region 3, Office et Q it fetor 62/09/28 lp. 
15403344 34JC Flch- 50-263, 82/09/28, 0210050102. 



60 



DOCKETED ITEMS 



210090117 RO on B2O93B, crac t indication In end cap of A reeirc wlation 
riser itanflr-ntad bij radiography Indication*. Initially 
detected by ultrasonic turn during normal Initrvice lnp 
Remedial meai ures under invest! gatlon 

SHfiMLA.H A NorcKirn 8tates Pouer Co 82/09/23 KEPFLER, d 
Raj ion 3. Office of Director Ip 15440 304 24X 
Fiche 50-363, 93/09/39,0210030117 

2100fiO2SB Forward* LER 92-QOB/03L-Q. 

MUSOLF. D Northern Btatei Power Co B2/09/29 Region 3. Office 

at Director Ip 1562) 067 24X Fictie 5O-263, B2/09/29, B2100403SB 

-a21GOiiQ36Q LER 82-QQ9/03L-0 on 630330. RC 1C barometEr condenser cooling 

mater supply valvE failed Cat) SB if by levered item due to 

Retort motor operator torque suitch miiad ju-itment Valve ite<n 
rep I at ad 

WOJCHQUSHI, A V Nortnsrn Statit Power CD 62/09/29 Region 3, 

Office at Direct oi- Ip 13621 06B 34X FUhe 50-363, 93/09/29, 
3210060258 



820929Q235 Public version of flevnion 4 to gsnerating Italian 
emergency t I an corporate cammand ctr emergency plan 
Implementing Procedure EOF-3, "Environ/Emergency 
Coorif inator " 

PAJDHBKI. J E Commonwealth Ednon Co 82/08/31 Jlpp 
S3564 124 24X Fiche 50-000. Ba/Of/ 16, 9209270123 

0210010009 Foruards info to suppl G207O1 request for eicmpllon Ifc 
A par 620917 telcon Request applies to 8ections III Q y j, 
It! 3 b r* installation of fire suppression ays 
JJAUaCH, T J Commonwealth Edison Co 92/09/23 ElBENIlUr, IV 
Division of Homing Bpp 1 5563 132 24X Fiche 50-000, 
B2IOOJ0009 



E2l<H2054i Releases public version of revised cover sheet to fttl 
procedur es 

FELTDN, J H Divif-lon of Rulei and Records 82/09/24 Ibcua 

Kanagement Branch Ip 15672 219 24X Fiche 50-254, D2/OP/J 4 



210190289 Foruards LER B2-016/01T-0 

MUSDLF. D Northirn Statu Power Co 62/10/12 Rglon 3. Office 

of Director Ip. 13742 173 24X Flchi 30-243,92/10/12.9310190309 

-82IO190293 LER B2-016/01T-Q on BH092S, three indication! in 22-inch 
diameter reactor reclrc ulation sjs mtr manifold and cap 
cDnfirmed as rejtctable Caused t>) intiroranu lar streis 
toTrnaion craeiirtj End cap to be r*plE*d 

HAULER, S Northern States Pour Co B2/1O/13 R*gion 3, Office 

of Director Ip 15742 176 24X Ficfi* 50-263,92/10/12, 
6210190289 



821Q12GS51 ForuiaTds public venion of revision cover 
procedures Completion of encl checklut requested 
KALJVIANAKrs.N Commonuiea] th Edison Co 03/07/15 



lo full' 



DPfice of Nucl*r Reactor Regulation. 
EflX Fiche 30-334,82/09/24,0210120344 



Director 6pp 



8310150487 Forward! IE Imp Repts 50-351/82-14 !. 50-S(,3/i)H If. OK 
370823-23 & O903 t, 09 No noncompl ianc e noted 

KEPPLER.J Rafllnn 3. Office of Director 82/09/30 |||IO < 
Commonwealth Ediion Co 3pp 15721 2EJ9 24X Tichi 50 J1H, 
6310150437 



OCKET 50-2A-1 DOW CHEMICAL CO 

1 Inturanc* & indemnity information 

3100-10331 Foruardi Endorssmenti 47 (, 49 to MEL I A Policij NF-160 
Endorsement 47 amends deicription of fjcilitij to incJuile 
Lark In Lab 

COALHELL, T H Dou Chemical Co 32/09/29 BAtTZHAN.JD Antitrust 
Si Economic inalijsil D ranch (Utility Finance) 3pp 15586 111 24 X 
FicJie 30-264, 82/09/29,6210040231 

Operating license stage document* & correspondence 



S210150495 IE Imp f!epts 50-554/92-14 fc 5O-2t5/03-l6 on 
0903 >j 09 Wo noncomp 1 lance noted Major areas inipecltd 
emergency p rcp-aredneis eiepcise & licensee actloni an 
previc-uilij identified emerijenig preparedness itcmi 
PHILLIPSrH P Division of Emergency Preparedness fc (fpt 
Support B3/09/29 I5pp 157B1 393 34X Fiche 3Q 9 
B210 150497 



63IO130376 Advise* that installation of offatte dose calculation IH" 
program Pullg operational tracking model ti operation*] 
A model will t> delayed until B31S31 to complete prlmi 
computer initallatlon 

EITARTZ,E D Coramonueal th Ediion Co 02/10/06 DENKlrMt II lim 
of Nuclear Reactor Regulation, Director 2pp 15602 OVIt .'!< 
Fiche 50-000,02/10/06,9310130376 



210160020 Reipjond* to FOIA recount for IOVBH categorlnl of documents 
re Dou Chemical Co & incineration tit 1 ou level raduaste 
Raqueit for fee waiver granted Forwards Hated document! 
FELTON, J H Divliton of Rulei and Record* 62/03/20 WILSON, A K\ 
Affiliation Untnonin Spp 13748 002 aflX Fiche 30-2A4, 93/OB/20, 
82I01B002a 



9210290047 Relsii public version of revislani to Quad CllL*i< Jloi 
Dresden emergancij plan anneies ! revised generating 
station emuT-jaiicij plan talephone directory 

FELTON, J M Division of Ruin and Records B2/10/OR l)n<L*|-' 

Kanaoement Drancli Ip 1S977 313 24X Fiche 50-006, Oa/IO/(lH 
6^10290047 



-82101002G9 Application far rntl of Hatl/Bupcoduct License! 
Bl -00363-06, 2 l-OOa6S-Oai 21-00263-04. ai-002AB-0'7,SNM- 1253, 
BTfl-327 t, fl-109 author! ring any ayproducl: ntatl batuiirt 
Atomic Numb en 3 & B3, tplHum. Po-210 (, Am-241 
HOVLE f H fi Dou Chemlial Co 73/06/35 2pp 15740 US 
Fiche- H0-2fi4, BB/08/20, 92(0160023 



Repcrtable occurrence*, UERs (c related 



210290202 RO on B21006,mal Punctl on OP Eberllne AWS-ti contfnuoui atr 
monitor pump cautad pump to be Inoperable for approx 1-h, Wo 

Ion of significant slgnalt indicated Pump repaired Changes 

to procedural or equipment under rvieu 

RAMPV, L W, , KMOLLiF J Dam Chemical Co 92/10/BO HILLER.J R 
Stand*rdii*tton d Bpgcial Projictt Branch Ip I5S93 394 24X 
Fie lie 30-264, 92/10/20,821029020? 



DCKGT SO-S45 QUAD-CITIES STATION. UNIT S 

Eecurltvi medical, amirgencu ft firs protaetion plans 

-" - "., *-__-_ ^_-,_, _ ^___^_ _ WM - ^^.^.i,..-- 

1209290125 fttleai** public version of reviitif fleneratinj station 

emergency plan corporate comnand ctr *mirBncv plan 
implement ing procedure 

FLTON.J M, Division of Ruin and 1 Records B2/09/li- Document 

Managaraent Branch IB. 13SA4: ISS 24X Fiche 50-OOOj S2/09/16, 
8209590129 

-8209290189 Forwards public version of Rtviiion 4 to genaratitig station 
marjenicy plan corpOTJite command ctr Emergenc-n Plan 
Implednntino Procedurs EOF-3, "Environ/rnai-j.encv 
Coordinator." Receipt fora ncl 



6210290060 Forwards public veriion of Revision G to Ouad CHI rt 1, J 

emsrgtncy plan annsies. Revi i i an 2 to Dresden emorgtncj ptan 

annsir Revis ior to Bijron emergencij plan annei b rfvlted 

generatlni) itatEon emargencij plan telephone directory 

MQtlREiR D Commoruaal th Edi*on CD 82/07/30 BnirOW.Uft w: - 

No Detailed; Affiliation Oiven 5pp 15877 314 IMX 

Fiche 50-000. BZ/10/OB, 0B10a90047 

B2I0290077 Public version of Revision 3 to Quad Citln t. IUn 

emergrncij plan annexe*. Revision 2 to Dresden ernei-tlnty plan 
annei & ftevition to Byron energency plan annex 
* Commonwealth Edison Co B2/0&/30 325pp IDli?7 UIV Ht 
FIch' 30-000, 613/10/09,0210290047 



a210B9000B Public version of revised generating station 
telephone d Ire ctorij 

OALLE.D P Commoninaalth Edison Co 82/00/12 4Jpf 
24X Fiche 50-000.62/10/09.8210290047 



l3Pf& 



PAJdtJSKJ, J E CoiniDfHifealth Ediian Co B2/09/O1 CMTOM.H R 
- Mo Detailed Affiliation Oiven Ip 19344-123, 24X 

Ftch' so-ooo, 



HRC 



9210190753 Foruard* B207S2 1 tr re late subtnittals of tttrclU 
scanaT'lai ft Failure to adhere to FEMA Outdance Hefna 17 If 
FEKA ifoei nut observe exercise, of filte authorities ut 1 1 not 
part IE t pat* 

HINO.J, A Division of Emergencv Preparedness b OperaLional 8u*jn 
B2/10/12 REE&, C Camtnoniueilth Edison Cn 2pp 13736 91' 341 
Fiche 90-294,82/10/12,0210190793 

B21 01 90740 Discuiies concerni re late submltfcals of (rm*rgi > i tt( , 
scenarios < failure to adhere to FEMA Ouidance Mima 17 
Future iTciia not meeting Intent of advance notif icalion 
guidance should be postponed or canceled 

BREHeNV.P. J Federal Emergency Management Agency BSJW3S 
KEPPLER.J O Region 3, Office of Director Ip 19736 S 341 
Ficht 30-Z94i 32/10/12,8210190733. 



DOCKETED ITEMS 



61 



62102B0361 Releases public version of revised emergency plan 
implementing procedures 

PEL TOM, J M Division of Rules and Records 82/1O/12 Document 

Management Branch Ip 1585? 204 24 X Fichu 50-294. 02/10/12, 
B2102BQ361 

--B2102BO364 Forwards public version of revised emergency plan 
implement ing procedures, me lud ing Procedures QEP 200-0 re 
emergency c end 1 1 ions, QEP 2OO-I1 re emergency action levels & 
QEP 330-3 re SPIMG control terminal operation 
KQv~ACK, T 3 , GERNER, L F Commonuea 1 th Edison Co 82/09/23 
DENrQN.H R- NRG - No Detailed Affiliation Given 3pp 15959 305 
S4X Fiche 50-234,82/10/12,8210280361 



0210230155 Forwards corrections to proposed Teh Spec Pages J 2/2 2-1 
3 3/4 3-B, sup porting rivieu of future reloads i revised 
Figure 3 5 1. Sheet 1, providing eitended MAPLHQR vs dlposuri 
curves for barrier lead tet assembly fuel 

RAUBCH, T J Commontuefllth Ediion Co 02/10/10 DENTON, H R Office 
of Nuclear Reactor Regulation Director Epp 1 57BB 233 24X 
Fiche 30-000, BS/IO/IB. 0210250155 

8210250177 Errata It Addenda Sheet B.replacina Page 4-10 to "LOCA 
Analysis Rapt for Dresden Units 2 i 3 t< Quad Cities 1 J. 2 
Nuc 1 ear Pouer Stationi " 

* General Electric Co NEDD-24146A EF1R 08 92/09/30 3p p 
13708 239 24X Flch 50-000-83/10/10.0310230155 



--Q21O2S0375 Public version of reviled emergency plan implementing 
procedures, including Procedures QEP 200-O re emergency 
conditions. QEP 200-T1 re Emergency ac tior, levels t OEP 330-3 
re SPING control terminal operation 

* Communuiealth Edison Co B2/09/23 2lpp 15959 207 34X 
Ficho 50-254.83/10/12,9210200361 



9210250069 Provides add 1 infd re reactor mater cleanup room area temp 
monitors Temp elements cause no automatic plant response 
beuond control room alarms 

RALJBCH, T J Commonwealth Edison Co B2/10/19 EISENHUT.D 
Division of Licensing 2pp 1 57B7 001 24X Fiche 50-000.93/10/19, 
8210250067 



521022-0359 Provides info re organnation * performance of depta 
responii&le For radiation protection ac ti vi ti es, per 820702 
cominl "-men* Training coordinator assigned in Apr 1902 to 
improve fiEalch physics training programs 

TRrtMrt. T R Commonuealth Edison Co B2/1O/14 DENTQN, H R Office 
at Nuclear Reactor Regulation, Director ?pp 15776 297 S4X 
Fiche 50-000. B2/1Q/14. 9210230339 



Inspection report!, IE Bulletin* i correspondence 



9210150487 Forwards IE Insp Rep ts 50-294/02-14 t. 50-265/82-16 on 
820023-25 tt 0903 d 09 No noncomp 1 iance notad 

KEPPLEft.J Region 3. Office of Director 92/09/30 REED. C 
Commonwealth Ediion Co 3pp 15731 2B9 B4X Fiche SO-254. 82/09/30, 
82I01S0407 



B21025Q3Q9 Responds to 820917 telcon request for info re fire 
protection safe shutdown rcpt I terns 2 fr 3 are preliminary 
resul f a, Bill) j to revision following engineering review 
RAUBCH, T J Commonwealth Edison Co 82/10/10 EIBENHUT, D Q 
Division of Licensing opp 15790 213 24X Fiche 50-254,02/10/18, 
8210250309 



P Operating license stage documents ti correspondent! 



Q2LOOE0142 Requests that charcoal ad&orbcr F&1-DYH3 be counted, within 
S LJ|B or rece ipt, decay corrected to 790319 levels & 
returned Liquid beta analyse* results received in NRC 
B2Q917 Itr ui 1 1 be incorporated in rept addendum 

PAPER 1ELLD, C J Division of Emergency Prep aredness ti Operational 
Support 93/09/20 KALIVIANAK IS, N Commonweal th Edison Co Ip 
L36O5 167 21X Fiche 50-231,83/09/29,0210090142 

02 101 20 105 Requsts delay of implementation due dates re NUnEO-0/37, 
Items It D 2, "Plant Shielding," II D 3, "Post-Accident 
Sampling" fc I I F 1 1. "Noble Oat Effluent Monitor " 
SWARTZ.E I> Commonucallh Edison Co B2/IO/04 EIEENHUT. D Q 
Division of Licensing 5pp 15651 337 24X Fiche 50-000,82/10/04. 
BS10I3010S 



9210150495 IE Imp Repts 50-254/S2-14 (< 50-269/02-li on 830923-25 S. 
0903 tt Of Ho noncompl lance noted Major areas Inspected 
emergency preparedness eierclse it licensee actions an 
previously Identified imergency preparedness items 
PHILLIP8.M P , SMITHiH J , AXELSQN, W L Division of Emergency 
Preparedness ti Operational Support 92/09/29 ISpp, 19721 292. 
24X Fiche 50-254, 8H-/09/30, 8210150407 

B3 100603 5 9 Ack receipt of 8307 1O Itr Informing WJ1C of steps taken to 
correct violations noted in 1C Imp Repts 90-237/01-39, 
50-249/91-32, 50-2B4/B1-23, 90-265/81-33, 50-395/B1-31 fc 
30-304/01-39 

SPESSArtD, R L Division of Project (< Resident Programs B2/1O/01, 
REED, C Commonuealth Edison Co Ip ISilB 394 24X 
Fiche 50-000, 9E/10/01 , B210060359 

8310060367 Respond* to NRC 820712 Itr re violations noted In IE In op 
Repts 50-237/81-39, 30-249/81-32, 30-294/01-23, 50-363/01-23. 
30-295/91-31 * 50-304/81-29 Corrective actions training for 
mat priorities re plant ava i 1 abili tij lull 1 be conducted 
REED.C Commonuiealth Erf i ion Co 82/09/10 KEPPLER.J.O Region 
3. Office of Director 13pp 1S61B 355 24 X 
Fiche 50-000,02/10/01,0210060359 



(1210360526 Forwards Revision 3 of Chapter 9 of "Offsite Dote 
Calculation Manual " 

GOLDEN, J C Commonuealth Edison Co 82/10/06 CASE, E Office of 
Nuclear Reactor Regulation, Director Zpp 15805 137 24X 
Ficlie 50-000,83/10/06,3210260526 

52102605^2 Revision 3 of Chapter 9 of "Offsite Dose Calculation 
Manual " 

> Commonuealth Edison Co 92/09/30 93pp 13005 13? 34X 
Flche SO-OOO, 02/10/06, 9210360926 

52LQlBOu5<? Provides addl guidance t clarification re 020806 request 
for addl info per NUREG-O737. Item II H 3, "Post-Accident 
Sampling Eifs " Detailed reliability analysis not required 
to satisfy NRC concerns 

CflUrCHFIELD, D Operating Reactors Branch 5 03/10/09 DELOEORQE, L 
Commonwealth Edison Co 3pp 24X Fiche 50-000,82/10/00,0210180039 

B2L019O7BO Foruards "OE BUK Eitended Load Line Limit Analysis for Ouarl 
Cities Nuclear Power Station Unit 1, Cycle 7 & Unit 2, Cycle 
6 ' 

RAUBCH. T J Commonuiealth Edion Co B2/10/12 EISENHUT, D O 
Division oF Licensing Ip 15736 206 34X Fiche 50-S54, S2/ 10/13, 
B210 190760 

-- B2101907B5 "O OUR Eitended Load Line Limit Analysis far Quad Cities 
Nuclear Pouer Station, Uni t 1, Cycle 7 fc Unit 2, Cucle 6. " 
Ooneral Electric Co NEDO-23192 02/07/31 31pp. 15736-207 
2-1 X Fiche 50-234, 82/10/12, S31O1907SO 

S210190445 Foruiaril* supplemental response to Oeneric Ltr 92-03 re 
implemintation status of NUREO-0737, 1 tems II B 3,11 F 1 Z, 
II F 1 3i II F 1 5 !t II F 1 6, in response to 821006 request 
SWARTZ, E D Commonuealth Edison Co 02/10/14 EISENHUT, D O 
Division of Licencing 9po 24 V Fiche 50-000,02/10/14,8210190445 



8210050170 Forwards listing of piping lys which fall to meet FBAR 
requirements, pr NRC 800919 confirmatory action Itr IE 
Bulletin 79-14 operabllltu. evaluation updates uiill not be 
provided for Dresden t> Quad Cities Final update by Dec 19BS 
RAUBCH, T J, Commonuaalth Edison Co 03/10/01 KEPPUEH, J Region 
3, Office of Director 6pp I5640'199 24X Fiche- 30-000, B2/10/01, 
8310080179 

9210060366 Confirms 621103 enforcement conference at Region 3 ofc re QA 
aspects associated id/procurement, intell*tion ti use of 
non-qualified valve guides in electramagnat ie relief valvel 
at facilities 

8PE9SARD,R L Division of Project d Resident Programs, 92/10/04 
RECD,C Commonwealth Edison Co Ip 15640- 1B1 24 K 
Fiche 50-000, 82/10/04-, 0210090-190 

0209190233 IE Info Notice 90-35, Sup pi 1, "Leaking k Dislodged I--123 
Implant Beeds " Svc list encl 

COfiB.L I Division of fuel F*cilitin, Material! t< Safeguards, 
03/10/06 Consolidated Edison Co of Nvui York 66pp 19761.330 

24X Flehe 50-000,82/10/06,8208190233 

B20ai9023B IE Bulletin 62-03, "8tre Corrosion Crocking In Thick- 
Mail, Large-Diameter, Stainlns Steel, Racirculatlon BIJS 
Piping at DWR Plants " Svc list end 

DEVOUNO.fi C Director's Office, Office of Inspection and 
Enforcement 82/10/14 Cc-niol Idflted Edison Co of Neu York 

115pp 19010-129 24X Flcht- 50-000, 83/IO/ 14, 8209190239 

R Periodic operating riportt b related correspondence 

9210130396 Forwards raontMv operating rtpts for Bept 1702, 

KALIVIANAKIS.N Comnonujealth Edison Co 02/10/01. Director's 

Office, Office, of In*p*ctlon and Enforcement Ip. 15680339 24 X 
Flche. 30-234, 03/10/01,8210130396. 



0210130390 Monthly operating rept* for Bept 19B2 

BUBS.R.D CommonuiBalth Edison Co 82/10/04 !3pn 
24X Fiche. 30-234, 02/10/01, B21013030A 



1S4BO 341. 



62 



DOCKETED ITEMS 



S Reportabl* ot currences, LER* & related correspondence" 

3210360467 PHO- 1 1 1-82-1 12 uttl notified that high density fuel storage 
racks initallcd do not meet design criteria for spacing due 
to buying condition Manufacturer reanalyied seismic rfsponiir 
of raclt k concluded bound instance acceptable 

GROHE. J . HALXft,R . STREETER.J fcsaion 3, Office of Director 
B2/1Q/18 Ip 15B06 237 24X Fiche 50-254,82/10/13,8210260407 



DOCKET 30-31,1, POINT BEACH NUCLEAR PLANT, WIT 1 

F Security, medical, emergency & fire protection plans 



0210120267 Foruardi documentation re steam generator roplactminl 
application filed prior to 820919 estab 1 1 shment of ABLD 
Documentation consists of (team generator repair repti A 
correspondence betuaen licensee I Commission W/o encl 
RIIlOWflV.DA Shaui Pictman. Potts S, Troubridfle IHDOIJAV.DA 
Wisconsin Electrlt Power Co 32/10/07 KLINE.J I! , PrtXTQN.H f 
Atomic Safitg and Licensing Board Panel 3pp 15655 32? 2 + x 
Fiche 50-266,82/10/07,8210120267 



B21O2O0027 Notice of B21117-20 evidentiary hearing in Tiuo Jlivtrv,UlT ( 
adequacy of iniervice nondestructive testing of sloevei 
proposed to be used to repair corroded steam generator 
tube* Prehearing conference to be held after hearing 
DLQCH, P & Atomic Safety and Licensing Board Panel G3/IOYIS Ip 
15756 323 24X Fiche 30-266,82/10/15,8210200027 



831004011*7 Discusses r vision of plant emerjenc-y respons-e procedure; 
specifying meet nary precautions required before post- 
accident re-entry into auxiliary bid; or facade, In reiponie 
to 920914 request for Info rr NUREQ-0737, Item II B 2 
FAV.C U Uis.conein Electric Power Co 02/09/24 DENTOM, H R 
Office of Nuclear Reactor flegul at( on, Director CLARK, R A 
Operating Reactors Branch 3 2pp 15581 301 24X 
Fich 50-266,62/09/24,8210040119 



B21O2O0055 Response to HI Environ Decada 820928 araenil to potman 
Intervene Decade eitabllihed standing but affiant P Andsnon 
must demonstrate -authority to act on behalf of Decade 
Certificate of Svc encl 

BACHMANN.R O , HCCURREN, H J Hearing Branch 1 82/10/10 rtl 

Safetg and Liceniing Hoard Panel 4pp 15753 OO6 24 K 
Fiche 50-266,82/10/15,8310200053 



8210090272 Forwards addl info requested in NHC 820916 telcon to 
support util 820630 App K piempti&n requgit Eight oversli 
draufngi encl Ap'rtura cards are available in PDF? 
FAViC M Ulsconiin Elictrlc. Pouier Co 02/09/39 DEM TON, H R 
Offici of Nuclear Reactor Regulation, Director CLARK, P, A 
Operating Reactari Branch 3 !3pp 13&06 047 24X 
Fiih 30-266, 33/09/29, 83J005027B 

8210030054 Faruardi eddl info rs proposed moils for emergancij Djppart 
ctr 

FAV, C M Uisconun Electric Power Co, 2/09/30 DEHTQH.H R 
Office of Nuclear Reactor Regulation, Director 16pp 15403 32 B 
24X Fiche 50-366,82/09/30,0210050-054 

S21027O256 Rele*i public version of riviied emergency plan 
imp lamenting praceiluriG 

FELTQN, J H Division of Rules and Records B3/10/OB Document 

Manajiment Branch Ip 1 SB3H 001 24X Ficlie 50-266,62/10/09. 
6210270256 

B210270259 Foriuardi public vrlon of revised emergencij plan 

Implementing prooduro, including Procedures EPIP I I rr 

initial clastif icatJon^ EPIP 1 3 re eitlmation of source 

term 4 EPIP I 4 re radiological doie evaluation 

FAV.C M Wisconsin Electric Power Co 83/09/10 DENTDJJ, H I! 

Office at Nuclear Reactor Regulation, Director CLARK. B A 

Operating Reactor* Branch 3 4pp 13834 002 24X 

Fiche 30-266., B2/10/OS, B210270236 

82102702-61 Public version of revised tm urgency plan implementing 

procedures, including Procedures EPIP 1 1 re initial 

c lasiif cat ion. EPIP 1 3 r estimation -of source term b 

EPIP 1 4 re radiological dole evaluation 

* Miicon*ln Electric Power Co 02/09/10 244pp 19834 006 24X 



B2I0190471 Fopuards aifdl info re 620630 request* for eiemption from 
10CFR50 Apo R concerning Fire Area ?, control room l> 
vertical cable tray*, In reipons* to 821001 & 06 telcons 
w/NRC H/16 nverilie drauiingi Apirture cards in PDR 
FAY.C W tjlsconlini Electric Pouer Co 62/10/11 DENTOH. H,R 
Off it* of Nuclear Reactor Regulation, Director CLARK, fl A 
Dparatlng Reactors Branch 3 12pp 19734 390 24X 
fich>;50-266, B2/10/11, B2101S047 1 



Adjudicator^ E or T tip and* nee 



6210250120 Notice of appearance in proceeding CertiFicati of !tvc 
ANDERSON, P Wiiconiin'1 Environmental Decade 82/10/20 Jp? 
157&7 116 24X Fiche 50-266,82/10/20,8210250120 



8310220242 Notice of relocation of 321117-20 hearing front Tun IHvin I, 
to Hilwaukee, HI Limited appearance statements will be tltin 
at original location on B21I17 

BLOCH, P B Atomic Safety and Licensing Doard Panel 83/10Y31 !| 
1S775 351 24X Fiche 50-266,82/10/21,8210220242 

G210EaO406 Ack receipt of B21Q1B Itr requesting document! Ul i L uk 1 1 
cooperate but is not required to respond since nonpsrtlti 
not entitled to discovery 

CHURCHILL, B U Shau, Pittman. Potts b Troubridge B3/\0/ys 
ANDEHBOW.P Wisconsin's Environmental Decade 3pp ISD03 lit Ifi 
Fiche 5O-2&6, 82/10/22,8310260406 

8210280253 Advises that utii requested to send FSAR Chapter 14 "!!*lrt| 
Analv>" to UI Environ Decade, in ref to B21018 telcon S-vt 
Hit encl Related correspondence 

CHURCHILL, B M 3haui, Pittman, Potts b Troybridge CItUJICHILI , U U 
Wilconsin Electric Power Co B2/10/25 ANDERSON, P Hitconiin'i 
Envlronmintal Decade 2pp 15839 027 24X Fichu 50-26-6,113/10^* 
8210280293 



K Utility Final Safetij Analysis Report (FSAfi) t, amends 



82Q7S90S57 Chapter 4 to Point Heach updated F9AR, "RGB " 

* UlBconiin EUctrlc Pouier Co 83/07/21 102pp 14921 074 
Fiche 50-266, 83/07/21,0207290337 



B207H90279 Chapter 11 to Point Death updated FSAR, ' 
Radiation Protection St| s " 

Wisconsin Electric Power Co 82/07/21 126pp 
Flehe 50-264,82/07/21,8207290279 



P Operating license stag* documents b correspondence 

B210210O09 Rtcotnrnends rivieu of design of InterconecLion- bitwifn 
redundant safety-related electrical load group* Design 
ihoilld be modified to assure full compliance u/Fteg OuliTi 
I A 

MICHELBON.C Director'! Office BO/ OB/27, DEN TON, If R DirecUr 
Offlc-e, 2pp IS7B2 208 24X Fiche' 50-066, BO/OH/27. 



8310040123 Amen* to MI Environ Decade 820810 petition to intervene 
including affidavits requesting HI Environ Decade to 
intervene on affiant behalf Certificate of Svc encl 
ANDERGON, P MUconsin's Envf ronmintal Decade S2/09/2H 
CommiisioneTS Spp 1S581 196 24X Fiche, 90-266,82/09/291 
82 10040 I 33 



S2100IOOOB Responds to FOIA request for 19 categories of dacuitnli 
nuclear reactor events t safety problems Forwards docunentl 
lilted In App A 

FELTON.J H Division of Rules and Records 82/06/SO UDGLU-B 
Critical Mass Energy Project ISff 15787 005 24X 
Fichi'9O-000, 82/06/28, 821 0010008 



B21Q050251 Mimorandufl i, order granting sunrnary disposition of ill UI 
Environ De*de iisuei ircept issue of deinonstration of 
adaquicij of eddy current tutltij to detect cr*cliiiig 
ELDCH.P . KLINE.J R . PAXTON.H C. Atonic Safety and Liceniins 
Board Panel. 52/10/01. Wtscontln's Environmental Decade. IVpp 

15610 304. 24K Fiche 80-266, 02/10/01, 8310090251 



8002I40K04 Foruardi evaluation of proposed Tech Specs change ta |T 
facility at 225O or 2000 psla Proposed changes are 
acceptable H/o encl 

CHECK, P S. Reactor Safety Branch 79/12/26 BCHUEMCEH. A 
Operating Reactors Branch 1 (Pre B004SB) 6pp 13727.030 311 
Flch* 30-OOO f 82/06/29,8210010008 



B21009027B Decision ALAB-6VA affirming ASLB B11I05 order, permitting 
plant to return to sv= aftir refuelino outage during uhlch 
lle*ni (tanned t repair degraded ntitn generator ou 
sleeving 

TOMPKINB,B A, Atonic Bafetu and Liceniing Appeal Panel SB/ 10/01. 
3'pp 18611:197. 24X Fiche' 80-844, S2/W/01, 8210030875. 



BE 100-700 07 Responds to FOIA request for eight categories of riear 
team generators ^ steam turbines, App A documents provided 
in R Udell FOIA Ruqueit 31-313 Forwards documents llt*d in 
App B 

FELTQN, J.M, Division of Rules and Records 92/08/10 LOW. D 
Winthropi Stimian, Putnam d Roberts 9pp 15645 063 S4X 
PJch*- 90-000, 83/08710,8210070007 



DOCKETED ITEMS 



63 



-79I22Q02B5 Summarifes steam generator tube leak on 730920 fc inap 
Ledt rate reached 560 gpd at 5 OO AM, caused by two 
tubes u/cracks located ui/in thickness of tube sheet k one 
tube u/leakij plug General cause plant conversion to AVT 
riQQNMi. V S Engineering Branch <Pre 79103O) 70/12/12 
GRIMES. Q K Assistant Director for Engineers & Projects (Prs 
79O635) 2pp J5645 2-14 StX Fiche 5O-OOO. 02/OB/ 10, B3I00700Q7 



-8310070205 Submits summary of findings & comments re facility stoam 
generator tub* leak incident t insp riiulti contained in 
Annual Optra ting Rept 1974 flecoiwnends that licensee bo 
requested to submit insp program for neit scheduled insp 
BHAQ.L C Engineering flranch fPr 791030) 77/07/25 
EISENHUT.D Division of Operating Reactors 2pp 1564S 235 
24X Fichs 50-000,82/08/10,0210070007 



-7907200103 Diitusses steam generator tube leak fc inservice insp Stsan) 
jener-ator caused by deep crevice cracking of three tubes 
uithiJi tube sheet Hot leg tube tests indicated 52 tubes u/ 
deep -crevice cracking in eicess of 5QX plugging limit 

t: V S Engineering Branch (Pre 79IO3O) 79/08/17 

T. ff Division of Operating Reactors 3pp 15645 554 
24X FicJie 5O-GOO,82/OB/10,82lOQ7Q007 



-EQ0430Q6I6 flequasts that util provide BNL tn/tube samplei For 
eiarninaUon Forwards iist of tubes 

HJQNAN, V S Engineering Branch BO/04/14 SCHWENCER, A 
Operating Reactors Branch 1 (Pre 80042B) 2pp 15615 366 
Fiche 50-000, B2/OB/1 0,621 0070007 



fetij evaluation of Aug 1980 steam generator insp 
mai| be operated safely per 791130 t> 



-00090-1 01^3 Forwards 
Cnnc]ud4?s generat 
BQOI03 orders 
PAULICiU.S S Materials Engineering Branch BO/OB/OB CLARK, H A 

Operating Reactors Branch 2 IP 15645 307 24 X 
Fiche 5O-OOQ-,S2/OB/ 10,921 0070007 

-eOQ9Q4O4'J7 Safety evaluation supporting operation of steam generators 
per 791I3O A B001O3 orders 

Materials Engineering Branch 8O/08/OS 7pp 15645 310 H4X 
Ficfie 50-000, B2/OS/IO, 6210070007 



-8210070203 Forwards request for add! info re 780524 staam generator 
tuba leak, per LER 78-010/Q1T-0 LER does not clearly 
indicate evaluation of exact location 

* Engineering Branch (Pre 791030) 7B/07/13 SCHWENCER, A 
Operating Reactors Branch 1 (Pre 770633 > 3pp 15645 341 24X 
Fiehe 50-000. B2/OB/10. 8210070007 



-B210070217 Eiprasses appreciation for 771130 effort to perform 
etsintlal licensing work an steam generator matter 
EISENHUT.O Division of Operating Reactors 79/12/03 
TRAHMELLiC M Operating Reactors flranch 1 (Pre 800438) If 
15645 2S7 24X Fiche 50-000,93/08/10.8210070007 



-8210070218 Forwards A Sequencer *< CM Trammell statement* re 791116 
LEI) 79-017, per 791228 request 

SCHHENCEfl.A Operating Reactors Branch 1 (Pra 80042B) 79/12/31 
EISENHUT. D Division of Operating Reactors ipp 15645 353 
24X Fich 50-000, 82/08/10, BB10070007 



8210040414 Poruards Amend! b3 b 68 to Licenaes DPR -24 b DPR-27, 
rispec tivtlg, saf ety evaluation & notice of issuance & 
availability Amends revise incervice inlp Tech Specs 
CUARK-R A Operating Reactori Branch 3 82/08/31 FAY.C W 
Wiiconsln Electric Pouer Co 5pp 13577 134 24X 
Flch* 50-266,82/08/31,8210040414 



-8IIO39005O Advises that technical rovieuiers providing input for BEH 
,nust ttf available to testify Jt 811029-31 hearings Schedule 
', ajtinda info one 1 

CLrtHK.R A Operating Reactors Branch 3 SI/10/20 MURPHY, E . 
CEHEMlAS. J i MD, T NRC - No Retailed Affiliation Owen 3pp 
I5643 271 24X Fiche 50-000.03/08/10,6210070007 



8210040420 Amends 43 !, 69 to Licenses DPR-24 k DPR-27, r eipect ivalu, 
reviling language of Tech Specs re Inservice Insp 
requirement s of safety claig components to conform 
U/10CFR3Q 35 

CLARK, R A Operating Reactors Branch 3 83/08/31 16pp 
15597 139 24X Fiche 50-266,82/08/31,8210040414 



Wcnueats evaluation by 811023 of utll 810702 application for 
license amend to permit steam generator tube sleeving Info 
to be presented at ASLD 811029-3O hearing 
COLBUflN,T Operating Reactors Branch 3 81/10/19 BALLA.HD, R L 

Environmental Engineering Branch Ip 15643 270 24X 
Fichu 50-000,02/08/10,8310070007 

-U111OV0062 Forwards safety evaluation for proposed steam generator- 
slee-vtng demonstration covering radiation protection 6 
At CiFTrt a;pec ts 

HflEOEB.itJ E Assistant Director for Radiation Protection 
31/10/3.2 NOVAK, T A Assistant Director for Operating Reactors 
4 pp. 156*5 276 24X Fiche 50-000,82/09/10,0210070007 

-811I2'1QO71 Submits review of utll request to demonstrate tube sleeving 
program Activities of proposed demonstration will not result 
in on<j significant environ impact 

BflLLARD.fi L Environmental Engineering Branch 81/10/23 
CLARK, F! A Operating Reactors Branch 3 Ip 15645 S80 24X 
FicJie 50-OOO, B3/OB/10. 0310O700O7 

-B2Q.2I20129 Discusses environ review of application for steam generator 
tub-e sleevifio program Environ impact insignificant 
OALLARC.fi L Division of Engineering 82/01/25 CLARK, R A 
ape-rating Reactors Branch 3 Ip 1564S 2B2 24X 
Fiche 50-000. B2/OS/10, 8310070007 

-8210D70LB5 Responds to 750320 question concerning 1 iteming action re 
'jcilftij steam generator tube rupture Incident W/a encl 
prellminari) results af tube insp performed bo 1 iceniee, Tech 
Specs. & related info 

GOLLEd, K R Division of Reactor Licensing (NHR-1973 only) 
/5/03/3I OALLO, J Hearings Division Ip 13645' 201 21X 
FichB 50-000.32/00/10,8210070007 

-B210O701B7 Informs of incorrect Info contained in third paragraph at 
End 3 to 7SO331 memo re facility itaam generator tube 
rupture incident Corrected paragraph submitted 
COLLEH-K A Division of Reactor Licensing (NRR-1975 only) 
VS/Ot/O 1 ? QALLO, J Hearings Division 2pp 18645-202 S4X 
Flclit 30-000,92/00/10.9210070007 

-9210070191 Requests technical assistance re 730S26 steam generator tube 
teakagit incident Revieu of end Info & current regulatory 
requl rem*ntt re (team generator tube integrity requested by 
750530 H/0 ends 

LCAR.& Division of Reactor Licensing 1NRR-1979 only) 7S/O4/1B 
ECHROEDER,F Division of Technical Revieu (NRR-1979 only) 3pp 
15643 204 24X Fiche 50-000, 02/OB/10i SS10070007 



8210040435 Safety evaluation supporting Amends 63 fr 6S to Licenses 
DPR-24 & DPR-27, respectively 

* Office of Nuclaar Reactor Regulation, Director 82/08/31 4pp 
15597 153 24X Fiche, 80-266, B3/OQ/31, 831004041-1 

8206210571 "Point Beach Nuclear Plant Units 1 t 2 Intarvica Insp 
Program Tachnical Evaluation Rept " 

Science Applications, Ine NRC-03-S2-096 SAI-1B6-08Q-B8 
82/06/19 NRC - No Detailed Affiliation Qiveti 20pp 

15597 139 34X Ficlie 50-S66, 82/08/31, S210040414 

0210040427 Notice of lisuance It availability of Amends A3 & 68 to 
Licenses DPR-34 & DPH-27, respective lij 

CLARK, R A Operating Reactors Branch 3 82/09/31 3pp 
1S597 179 24X Fiche 50-346, 02/08/31 , 8210040414 

8210050005 Advises that error analysis of reactor vessel uater level 
instrumentation sys requested in NRC 020617 Itr uill be 
4V>ilbli by 630119 

FAV.C H, Uitconsin Electric Power Co 82/07/29 DENTON, H R 
Office of Nuclear Reactor Regulation, Director CLARK, R A 
Operating Reactors Branch 3 Ip 15609 208 24 X 
Fiche 50-366,82/09/39,6210050005 

8510050055 Foriuard* info requested In NRC 82063O Itr re implementation 
of THI Item II D 2. "Poit-Accl dent Sampling 0ys " Arfdl 
rvquirements re backup pouer sources for lab are beyond 
scope of original NUREO-0737 implementation schedule 
BURSTERS Mlicontin Electric Pouer Co 02/09/30 DENTON, H R 
Office of Nuclear Reactor Regulation* Director CLARK, P A 
Operating Reactor* Branch 3 31pp 15603 307 34X 
Fiche 30-266, 82/09/30,02100500)55 

8310050233 Application to amend License* DPR-24 |> DPR-27. revlting *pent 
fuel pool poison lurveillance specimen location b clarifying 
conditions for operating power operated relief valve* 
FAY, H Hi >c or .in Electric Pouer Co 82/09/30 DENTDN.KR 
Office of Nuclear Reactor Regulation, Director, 3pp 1 3409,056, 
24X FiChe.50-B64. B3/O9/30, S21OOS0332 



8210050331 Proposed Tech Bpect revising spent fuel pool polton 
surveillance specimen location fc clarifying condition for 
operating i over-operated relief valve* 

* Ulsconiln Electric Pouer Co, 82/09/30 3pp 19609' OS? 
Fiche 80-266, B2/09/30,82100&OS22 



84 X 



64 



DOCKETED ITEMS 



S2102?0fl26 Forwards Amsnil 44 & 69 to Llcnin PPfl-34 t DPR-27, 
reipect ivelij, saf ty evaluation fc notice of iisuance t< 
aval lab iH tij Amends modify operation & survei 1 1 one* teiting 
requireminti of containment purg ivpply t eihaust valves 
COLBURN, r operatina Reactors Branch 3 B2/10/04 FAY, C W 
Hiicnnsin Electric Power Co 4pp 159*3 143 24X 
Fiche S0-26t, 82/10/04, B2102W436 

9210290431 Amends 64 1 69 tP Llceniei DPfi-a4 b DPH-27, r-nspec t ively. 

.Codifying operation t. surveillance teting requirements of 
containment .purgn supply i> e-ihaust Isolation valvei t< 
terminology of Tetfi Spec 15 4 4 on luting 

CLARK. R A Oparatino Realtors Branch 3 Ba/10/04 12pp 
I5B63 154 24X Piths 30-246.82/10/04.6210390426 

B21Q290436 Safety evaluation supporting Amends 44 & &9 to LicansM 
O-PH-24 t DPR-27. respectively 

* Office of Nuclear Realtor Regulation Director 33/10/04 5pp 
13B63 I4b E4X Fiche 80-266, 02/10/04, B2I029Q436 

B210290441 Notice of Issuance t, availability of Amends 64 t 69 to 
Licenses DPH-24 t DPR-37, respec ti vely 

CLARK. R A, Operating Realtors Dranch 3 fla/10/04 2pp 
lSBd.3 131 24X Fiche 30-246.83/10/04.6210290426 



921Q2AQQ79 Proposes 1 Tech Spec changd incorporating reviuoni rt 
ariminis trat iv control of high radiation areas 

Uiscontin Electric Pouer Co 02/1O/I9 Ip 15B06 239 ^^ 
Fichf 50-266. B2/10/I9. 6210360476 

82103130295 Application to amend Licinse* DPR-34 t DPR-27. changing Ti[i 
Specs re r*q.u Inments for periodic leakage rate testing at 
containment airlock doors Class I !, II amend fees end 
FAV.C H Wisconsin Electric Power Co 02/10/21 DENrQN.H B 
Offict a! Nuclear Raactor Regulation. Director 3pp 1SB37 273 
34!>: Fiche 50-266. 62/10/31 . 82102a02?5 

--S2102B029a Tech Spot Change fienuest B2, changing requirements For 
periodic leatage rate testing of containment air locfc doors 
t IMiconsln Electric Pouer Co 82/10/21 4pp 13B37 275 341 
Fitht 50-366,02/10/31.6210300295 

8210290294 Provides results of confirmatory analysis demonstrat Lng 
that unacceptable radioactive release from containment 
uauld not takt place as result of ima 1 1 break LOCA in uhich 
ajitrator action required Kailioactlv release negligible 
FAY.C M Wisconsin Electric Power Co B3/ 10/22 CLARK, R A 
Operating Reactors Dranch 3 Ip [5853 135 24X 
Ficho 90-266, B2/ 10/33. 3310390294 



0210130267 Foruardi documentation re steam generator replacement 
application filed prior to 620919 establishment of ASLB 
Docunantat Ion conslatt af qteam generator repair repts d 
corre-iponiience be>tuoen licensee ft Comini s i o n H/o encl 
RJDOHAV.D A SNaiu, Pittmaiu Pott* t Troubr Idge. RIOOWAY.D A 
Wi*cc-nin flectric Power Co 82/1O/07 HLING.J R , PAXTON. H C 
Atonic Sdfitif and Licencing Doarif Panel 3pp 13652327 34X 
Fiche 30-266,62/10/07.821.0120367 

B210150430 Advns that refuelins Bftutdouin at end of Cucle 10 planned 
to begin 821022 Startup of Cucle II e-ipected to occur in 
early Dec 1932 Cycle 11 reload core designed to operate 
under current no-nlnal design parameters & Tech Sftct 
FAY.C H WlBcomin Electric Pomer Co S2/ 1O/1J DENTOM. H R 
Office of Nuclear Reactor Regulation, Director CLARK, R A 
Operating R&actors Branch 3 2pp 13704 O19 ?4X 
Fiche 50-246, 62/ 10/1 1 , 82IOJS0430 

62101902S4 Advises Dp mod to HC3 gas vent sy > to prevent operation of 
pouer operated valves ifuring normal plant operation' per 
921019 telcqn Physical rettrjining de-vice fitted on or over 
valve operator sutteh 

FAV.C W Wisconsin Elffctnt Pouer Co 83/10/15 DENT OH, H R 
Office of Nuclear Reactor Regulation, Dime tor CLARK. R A 
Operating Reactors Branch 3 Ip 1574S 177 24 X 
Fiche 50-266, 82/1O/13, 921O1TO2B4 



Inspection reports. IE Bulletins ! correspondence 



0107270156 Forwards addl info in response to IE Bulletin BO-H re 
rcasanr-v ualli Thirteen repti & 109 oversiie drawings end 
Aperture cards are available in PDR 

FAY.C U Wisconsin Electric Power Co 81/07/17 DENTOH. H R 
Office of Nuclear Reactor Regulation, Director CLAHH. H Dj>raiirj 
Reactors Dranch 3 I9pp Available at NTI5 09151 02i SIX 
Fiehe SO-36A. Bl/07/17, 810727O1 56 



-0107270161 "Modal Contribution to Dynamic Analysis Results " 
n Computech Engineering Services, Inc R553 O.J 01/O7/31 
091S1 043 24X Fiche 90-266,01/07/17,8107270196 



-9107270166 "Cyclic Loading Tests of Masonry Single Pier*,Vol I - Hi:j 
to Width Ra tlo of 2 " 

HIDALOO.P A . MAYE6.R L. , MCHIVCM.H D California, Univ o(. 
Berkeleu UCD/EERC-7Q/27 V01 70/11/30 I41pp AvailaEilt at 
NTfS 09151 15B SflX Fiche SO-266, Bl/07/1 7, SI072701 56 



-9107270149 "Cyclic Loading Tests of Masonry Singlo Piert.uol a - 
to Width Ratio of 1 " 

CHEN. B J HIDrttOOi P A . MA YE 5, R L California. Unlv of. 
Berkeley UCD/EEnC-70/28 V03 7B/ 12/31 lOflpp 07151 Sfff 

Fiehe 50-366,81/07/17,9107270156 



B210190519 Foryairdi responses to request for addl Info on Tech 
Cnange Request S3 re operation uihtn addl steam generator 
tube plugging causes primary sus flaw to drop below thermal 
dailgn flow value 

FAViC H Uliconitn Electric Power Co B2/10/15 DENTDM, H R 
Office of Muclieal- Reaefcor Regulation, Director CLARK, R A 
Operating Aeactor-c Branch 3 3pp 15751 23B 24* 
Fiche HO-S66, 02/10/15,8210190519 



821027029^ Forwards Amend* 65 fc 70 to Licenses DPR-24 b DPfl-27. 
reipectiveliji safety evaluation & notice of issuance d 
availability Amend allous r-elaiatlon of monthlg turbine stop 
tt governor valve tests during end of cycle operation 
COLBURN.T 0, Operating Reactors Branch 3 02/10/13 FAY<C 
Wiitoniin Electric Pouer Co 3pn 19936 316 24X 



Liceniei DPR-24 ti DPR-27. respect ively. 
nthlu toraine stop & governor valve 
operation, 

Branch 3 02/10/15 7ff 
S.B21 0270294 



L i Licenses 

Spp 



-BIQ7270I74 "Cyclic Loadlnj Tosts of Masonry Single Piers, vol J - ^n 1 
to Hidtlv Ratio or 3 " 

HIDtt-GO, P A , MAVEB.R L , MCNIVEN. H D California, Unlv at' 
G*rkiU(t UCO/EERC-79/12 v03 79/05/31 I54pp Avllahl li 
NTIS O7152 134 24X Fiche 30-366, 01/O7/17, 0IO727O1 56 

-SI0727O178 "Shaling Table Btudy of Single-Story Masonry Hjusf*> u o! 1 
Test Structure* 1 ( 2 " 
OU.KAN.P , KAVE8, H L . CLGUQH.R U California, (Jniv of, BcrltN, 

OCfl/EERC-7'9/23 V01 79/09/30 275pp Available at MTIS 
Off3a.H77 24X Fiche- 90-266, 61/07/17,0107870136 

-31072701 2: "Snaking Table Study of Single-Story Masonry House*, Vol f - 
Test Structures 3 t< 4 " 
OULKAN.P , MAYES.H L . CLOUQH, R H California, Univ of. BrllN| 

UCB/EERC-79/24 V02 79/09/30 300pp 09153 104 24X 
Fiche SO-S66,al/07/17,ai07270156 

-ai07270te& "Shading Tattle Study of Single-Story Masonry lli>usil,Vol J- 
Summaryi Conelui ons t> Recommendations " 
CLOUCH, R,W , MAYES.R L , DULKAN, P California, Univ of, Berttln 

UCD/EERC-7?/2S VO3 79/09/3O IlOpp Available at HTI8 
09154 078 24X Fiche 90-266,81/07/17/0107270196 

-Bt0727Oiaa "Cyclic Shear Tests of Masonry Piers,Vol I - Tut Ptlvlii ' 
MAYESR,L . OMATE. Y i CLOUOH. R H California, Univ of, HirkUti 
EERC 7(b-B 76/05/31 lOSpp 09194 192 24X 
Fiche.SO-264, 91/07/17, 8 107270 1 S6 



-3iO7Z7O191 "Cyclic Shear Tests of Maionry PiersiVol 2 ~ Arnlijdi 
Ttst Resiflts " 

HAYESrR L . QMATE, Y , CLOUOH. fl W California, Univ of, Birkl 
EERC 76-16 7&/06/30. 7Bpp 091S4 2B9 B4X 
Fiehe; 50 -246,81/07/17.8107270156 



-9107270194 "Strength of Timber Roof Connactions Subjected to Cftllt 
Laadi " 
OULKAN.P , WAYEB.R L , CLOUOH. R W California, Univ af, D.rt*Ii| 

UCB/EERC-7B/17. 7B/09/30 17Ipp 0915S 005 24X 
Flehe'50-26A, 81/07/17,8107870156 



DOCKETED ITEMS 



65 



-BIQ7270196 'Literature Survey Transverse Strength of Masonry Wall; 
nr-tATE. V , HA^ES.H L . CHEN. S J California. Univ of, Berkeley 
L/CB/EEHC-77/O7 77/O3/31 l49pp O9155 140 21X 
Fiche 50-366, 01 /O7/17. B10727O1 56 



8107270193 'Literature Survey 



. Tensile, Dond b Shear Strength 



HAVES R L , CLOUGH:H H California. Univ of, Berkeley EERC 
75-85 75/06/30 312pp O9155 3B6 34X Fiche 50-266,81/07/17. 



8206210571 "Point Beach Nuclear Plant Units 1 b 2 Inmrvico 1 nap 
Program Technical Evaluation Rapt " 

Science Applications, Inc NHC-03-B2-094 SAI-13.6-02H-33 
82/06/15 NHC - No Detailed Affiliation Qivon 20pp 

19597 199 34X Fich 50-266,82/08/31,6210040414 

0510040427 Notice of issuance < availability of rtmonds A3 & i.0 it 
Licenses DPR-24 & DPR-37. i espec tive ly 

CLARK, R A Operating Reactors Branch 3 B2/OB/31 3pp 
19597 179 34X Fichs 50-266,83/08/31.8310040414 



-S1O727O197 "State-of-<-hc-Art in Seismic Shear Strength of Masonry 
evaluation I Revieu : 

MAVEB.fi L . CLOUOH.fi W La 1 1 forma , (Jniv nf, Burialey ECHC 
75-51 75/10/31 I47pp Q9I56 135 34X Ficoe 50-366, BI/O7/17, 
(it 0727015ft 



83100S0186 Forwards IE Insp Ropts 90-266/82-12 6 50-3O1 /B2-12 on 
820303-04 t< 0619 (. notice of violation 

KEPPLER.J Region 3, Office of Director 82/0?/15 BURSTEIH, 
Wisconsin Electric Pouer Co 3pp 1S611 113 24X 
Fiche 90-266, 03/09/13,8310050104, 



21OG7QOO7 Responds to FOIA request for eight categories nf records re 
strain generators & steam turbines App A documents provided 
in a Udell FOIA Request Bl-313 Forwards documents listed in 
App, D 

r EL TOW. J M Division of Rules anil Records B2/OB/10 LONQ, D J 
Mitithr-op. <3tiinson. Putnam S. Roberts 9pp 15645 063 24X 
Fiche 5O-CQO. 53/03/10.8310070007 

7812200205 Surmarues steam generator tube leak on 78092O t< i nsp 
Lvat ^a^e reached 560 gpd at 5 00 AM. caused by two 
tuies u/cracks located ui/in thickness of tube sheet tt one 
(rube bi/lcaky P' U 9 General cause plant conversion to AVT 
MIOfWJ. V S Engineering Branch IPre 791Q30) 78/12/13 
GKEHES. D K Assistant Director for Engineers & Projects (Pre 
79D625) 2pp 15645 34-1 24* Fiche 30-000, S3/OB/10, B210070007 

-T9O92BO1O5 Discusses steam generator lube leak (. inservice insp Steam 
generator caused by deep crevice cracking of thi ce tubes 
uMthin tube sheet Hot leg tube tests indicated 52 tubes u/ 
deep crevice cracking in eicess of SOX plugging limit 
fvDOMAN.V S Engineering Branch (Pro 791030) 79/OS/17 
fclEENHUT, [1 Division of Operating Reac tors 3pp 15645 254 
24X Fiche 50-000. S2/OB/ 10,021 0070007 

-B2 J CO7QI3 1 ? Forwards tabulated data on s toam generator insp !( maint at 
facilities. Data should be provided to licensees 
IPPOLITDi T Opera'-ing Reactors Assessment Branch B2/O4/01 
VARUfl. S Operating Reactors Branch 1 5pp 15645 131 24X 
Fiche SO-000, 82/08/10, B3I0070007 

-G21QO7QI72 Foruiards info re steam generator integrity t> insps at all 
Operating PURs. per 7503501, 31 requests Details of Inspai 
including defect ind icati nns, tube plugging criteria & tubes 
plugged ui 1 I nol be provided cicept far Point Beach 1 
GOLLER K R Division of Reactor Licensing (MRR-1975 only) 
79/O3/24 MflCCARY.R R Division of Technical Hevieu [NHR-I975 
Q nlHj> Spfi (5i15 196 21X Ficho 50-000, 82/08/10, 8210070007 



B21005OW4 Notice of violation from Insp on 820503-04 i OAI5 

KEPPLER. J Region 3, Office of Director B2/09/19 3p p 
15611 MB 34X Fiche 30-266, B2/Q9/ 15, B2100S0186 

B210050205 IE Insp Repts 50-266/83-12 !. 50-301-82-12 on B30S03-04 !< 

0615 Nnncompl iance noted failure to control access to high 
radiation areas t failure to follow approved procedures 
LOVENDALE.P C . HAGUE, R L , OREGER, L R Region 3. Office o* 
Director 82/07/13 Qpp 15611 121 34X Fiche 50-266. (?2/'9/15, 
32 10050 186 

S210D70Q33 Notifies that foes for B20B20 application requesting, relief 
from certain inservice insp requirements not remitted 
w/application Class lit fee category appropriate 
DIOQS.R H License Fee Management Branch B2/09/23 FAY. C W 
Wisconsin Electric Power Co lp 15649 346 84X 
Ficha 90-266,83/07/23,8310070033 

B2100S0256 Requests relief from ASME Sac tion XI , (naervico insji 
requiremiinta re> frequency of reactor vessel interior exam 
FAY.C W Wisconsin Electric Powor Co B3/O9/39 DENIuN, H B 
Office of Nuclear Reactor Regulation, Director CLARK. R A 
Operating Raactori Branch 3 4pp 15610 306 34X 
Fiche 90-266, B2/O9/2 1 ?. 83100SOH9i 

8210190669 Forwards IE Insp Repts 90-266/03-30 t, 50-301/B2-20 an 
030914-16 No noncompl iance noted 
LITTLE, H 8 Division of Engineering fc Technical Programs aa/10/04 

DUMTEIN'S Wisconsin Electric Pouer Co 2pp 1573Q'1S3 24X 
FichB 30-266, 82/10/04,3210190669 

--88 10 WOWS IE In*p Repts 30-266/B2-20 b SO-301/B2-20 on 82071 4-16 
No noncompl i*nce noteil Major areas inspected surveillance 
d callbr procdora t performance history 

HAS3E.R A , PEaCHEUJ M i HAWKINS, F C Division of Eng ineor i np & 
Technical Programs 82/07/29 4pp 1373Q 131 24K 
Fiche SO-S66, B2/10/O4. B2101 90669 



--Q210O702O5 Submits summary of findings & comments le facility atenm 
generator tube leak incident & Insp results contained In 
Annual Operating Rapt 197& Recommends that licensed be 
req.uastod to submit insp program for next scheduled insp 
CHAD, L C Engineering Branch (Pra 791030) 77/07/S3 
EISEIJHUr.B G Divslon of Operating Reactors 2pp 13649 335 
24K Ftclie 90-000,83/08/10.8310070007 

B2IOO7022B Forwards evaluation of B00236 proposed steam generator inap 

It tube pulling program Recommends that program he revised 

to reflect listed comments 

fjOONAM-V 5 Engineering Branch 82/08/10 6CHWENCEH, A 

Operating Reactors Branch 1 IPre B004E9) 2pp 15645 268 34X 

Fichu 50-000, B2/OB/10, 8210070007 

ti2LOQ40411 Forwards Amends 63 fc fifl lo Licenses DPR-24 U DPR-27. 
respect tlvelyp safety evaluation fc notice of issuanco !< 
dvallablllty Amancfg revise inservice Imp Tech Specs 
CLAFIK.R A Operating Reactors Hrflnch 3 B2/OB/31 FAY, C W 
IJisconsin Electric Pouer Co 5PP 13597 134 24X 
Fichu 50-246. 62/08/31, 821004O414 

B2IOQ4O420 Amends 63 b 68 to Licenses OPR-24 t. DPR-27, respnct ively, 

ravliing language of Tech Spall re inservlce insp 



requirements of safety class components to conform 
U/10CFF15O 55 

CLARK. R A Operating Reactors Branch 3 B2/OB/31 
15597 139 24X Fiche 50-266, B3/08/31 . SSI 0040414 



16pp 



Q2IOD4O435 Safety evaluation supporting Amends 63 & 68 to Licenses 
BPR-21 b DPR-27, respectively 

* Office of Nuclear Reactor Regulation. Director 82/08/31 
15597,155 24X Fiche 50-364- B3/OB/31, B31004041 4 



4pp 



8208190233 IE Info Notite BO-33. Buppl 1, "Leaking t Dislodgiad 1-133 
tmpUnt 6edi " Svc Hit and 

CODDrL I Division of Fuel Facilities, Materials (. Safeguards 
82/10/06 Consolidated Edison Co of Nsui Voik 66pp 13761 230 

24X FichB SO-000. 92/10/06, B30B190233 

8210180067 Forwards Cla III foe rt B20B20 request for eiemptians 
from certain inservice insp requirements (Jt 1 1 considers 
imposition of 10CFRI70 22 fees Inappropriate an request does 
not involve license amend 

FAV.C U Wisconsin Elnctric Power Co 83/10/11. DENTON. H R 
Office of Nuclear Reactor Regulation, Director CLARK, R A 
Bperating Reactors Branch 3 lp 13730>003 34X 
Fiche BO-266, S2/10/1 1 - B3101BOO67 

B30B19033B IE Bulletin 8B-03. "Stress Corrosion Cracking in Thick- 
Mll.Large-Dlaintt>r.8talnl*is StesI.Becircu latian Sus 
Piping 't BWR Plnt. " Bvc lit encl 

DEYOUNO.fi C Director's Officer Office of Inspection and 
Enforcement 82/10/14 Consolidated Edison Co of NBU Yorl 

119pp 13810 1SB. H4K Fich* 30-000,82/10/14,8300190238 

R Periodic oparattng reports d related correspondence 

8210150190 Foruiards monthly operating r*pt for Sept 1982 

FAY, C W Miiconfln Electric Pouer Co B2/10/H Office of 

Nuclear Raactor Renulation, Director lp 19697 074 34X 
Ficht,SO-2i6, aS/IO/1 1,82101901 30 



-8210150158 Monthly operating repts for Sept 19B2, 
FAVtC W HUconsin Electric Power Co BH/10/04 
24X Fiche go-S66.e2/10/ll>8210130150, 



Qpp 



1S&97.075 



DOCKETED ITEMS 



S Importable o ccurrence'tj LERi related correspondence 

6310390259 Forward* LEfl 9S-015/03L-Q 

FAY, C, W Wisconsin Electric Pouer Co 02/10/13 HEPPLER. J 
Rejlon 3, Office of Director Ip 1 5791 1 4B 34X 
Fiche 50-366. 82/10/13,3310350253 

21025-0262 LER 82-015/03L-0 on 930914. fluid level in gat stripper noted 
decreasing abnormally after stripper returned to svc 
Following main* Gained by high itreiis IDU cycle failure of 
lap joint flans* tub P i Lap Jpint Planoe reflated 
FAY.C U Hi!COTHin Electric Pouer Co 02/10/13 RecioTi 3, 

Office of Director 3pp IS771 147 S4X Fiche 50-266,02/10/13. 
8210250253 



8210220404 Ack receipt of B209I9 response to App A it urns of | 
Emergency Preparedness Appraiial Reft 50-267/03-01 Add I Info 
needed to complete avaluation of rosponso 
MAD9EN.G - - - - - 

Programs 

15779 160 24X Fichu 30-367,02/10/19,0310220404 



d to complete avaluation of retponso 

N.G L Diviiton of Resident, Reactor Project S En-j insir Imj 
ami B2/1O/19 LEE, ft Public Service Co of Colorado ?|i 
9 160 24X Fiche SO-367,02/10/19, 0310220404 



p Operating licenit stage documents 4 correspondence 

9210040114 Foruardi info documentlns satisfaction of each trlttrion 
of NUREO'0737i I tra fl B 3 ro post-accident sampling sys 
ORML inVf itigatior of source term* remainv onlij open item 
WAREMBOUJJO Pub-lie 3arvice CD of Colorado B2/09/37 CiMK.K A 
Operating RBactart Branch 3 40pp 15591 lli SAX 
F*che SO-2t7,e2/0 1 ?/27,8210D40H4 



9210250344 Forward* LEfl 92-Q16/01T-0 

FAY,C H Hueonain Electric Power Co 83/10/15 KEPPLER.J 
Region 3. Office of Director Ip 15790332 24X 
Fiche SO-B6&. 32/10/13,3210330344 

6210350353 LER 92-016/011-0 on 821003. containment Isolation Valve 
ICV-aaOOC In suction line of radioactive gas A particulatt 
monitoring su.! failed to close Caused by failure of 3-uay 
solenoid valve to cycle Valve closed & repaired 

FAY.C U Ulieoniln Electric Power Co 02/10/15 Region 3. 

Office of Director 4pp 15790 333 24X Fitht 50-266, 93/ 10/1S. 
S3102S0344 



9210000256 ForuJirdt "Radiochemica 1 Analysis of First Plateoul I'rntr 
from Fort at Vrain High-Temp Oas-Caoled Roactor " 
WAREMBDUR&,D M Public Service Co of Colorado B2/09/a/ 
KUZrtVC/.O HRC - No Detailed Affiliation Olven [p tihW -"J!0 
Sty Flch* 50-26:7, as/09/27. 6210060256 

--B2100B025B "Rat 1 ochemical Analysis of First Platoout Probg (row ft.il 
St Vrain High-Temp Q4-Cooled Reactor " 
BURNETTE.R D Oft Technolog iei, Inc /General Atomic Co 

B2/04/30 I28jp 15649291 24X Fiche 50-367, 
210080256 



T Haring transcript* on non-ant i trosit matter* 



3210-090052 Transcript of 921006 telephone conference to discus* 
rescheduling of hnarjng In Uaih ing tt>n. DC Pp 1.342-1.352 
* Atomic Safety and Licensing Board Panel 02/10/06 13pp 
15643 294 24X Fiche SO-S66, 92/10/06, 0210090052 



B31Q04O273 Forwards suppl to EE-1 1-0002, Revia inn 3, "Addl GurvillUnci 
Fteo.ulrtmenti For PCRV Penetrations t Clocuret," tt suppl to 
EE-22'-O002, Hevision I. "InservicB tnsp & Testing Program 
Addl Survei 1 1-anc B RequiremBnti for Steam Oeneratnr " 
BREYi H L Public Service Co of Colorado B2/09/3O CLAW. II A 
Operating fleactor* Branch 3 2pp 15621 leo 24X 
rtcha 30-367,02/09/30,9210060273 



DOCKET 50-S67 FORT BT VRAIN MUCLEAR ftENERATIWO STrtTlDM 
F Security medlcali emergencv & fire proiectlon plan* 



0210060292 Sup pi to EE-1 1-0002, Revis i on S. "Fort Bt Vraln A4dl 
Surveillance Requirement* for PCRV Penetrations ti Clomurn 
* Public Service Co of Colorailo 32/09 /aa 12pp 1BAHI 1EIJ 
24X Fiche 30-267, B2/09/30, 9210060273 



9209150434 RD-leai*! public vert-ion of updated radiological em?rgvncy 
response; plan. 

FELTt!N.J,M Dlviiion of Ruin and Records 92/00/ES Document 

Manftgament Branch Ip 14B90 193 29X Fiche 50-267, 82/0"B/33, 
9207130434 



~9ai00602BA Suppl to EE-22-0002. Revision 1. "Fort St Vrain Int 
Imp & Titlng Program Addl Surveillance Requirement! ti' 
Steam Oenerato-r " 

Public Service Co of Colorado B2/09/2B 7pp ISA^I 
24X Ftche 50-267, B3/09/30, S210060273 



G2091Q0440 Forward! public veriion of updated radiological emergency 
Tes-ponie plan, per B20315 reitueit Enct reviiinn it almoit 
complete raurlte exclpt for visit on ctr !e HEfiP-FIELD 
procBifiir>i W/o encl 

HAREMBOimO, D Public Service Co of Colorado:, 62/09/10 
ROHRER, & Director'* Otfi-ct, Office of Inspection and Enforcement 
Ip 14370 174 24X Flche 30-267, 32/03/33, 9209150434 



S3 1 01 90701 Forward! "Fort St Vrain Accident Reanalysn Cnde IIUH'A J 
Verification Following Region Outlet Temp Redistribution," 
per B102IO meeting commitment Code accurala lij predict! 
transient behavior in temp red! itribut ion configuration, 
DREY. H L Publir Service Co of ColorariP 02/10/06 NOVAK, I H 
Aeiistant Director for Operating Reactors Ip 1373& 355 . hJ U 
Fiche SO-267, 02/10/06, 9210190701 



9210250093 Commit* to reviling security plan & implementing Pro cud urn 
APH Q-4 to provide fur background invt-ttlgat ion of outside 
contractor personnel at Facility Screening program will be 
Implemented within 60 daye 

LEE,O R Public Service Co. of Coloi-jifD 62/00/25 COLL[NB,J T 
Region 4i Office of Director. 3pp 15797 0&3 24X 
Ficht 50-S67, B2/OB/3Bi B2102B0083 

9210210073 Releases public virtlon of radiological emergency rafiponaB 
plan implementing' procedures. 

FELTOM, J.M Dlvleion of Rules and flu cords 03/09/27 Dncument 

Management Branch Ip 19774 126 24X Ficht SO-SA7t 92/09/29, 
6210310073 

B21-0-2lOOai Foruerdi public veriion of radiological emergencu reaponae 
plan implementing procedureii including Inp lint/oni i tt 
"" " " 'ure & field monitoring 



0210170706 "Fort St Vrain Accident ReanalijsJa Code (RECA Ul 

Verification Following Region Outlet Temp Redistribution " 

Public Service Co of Colorado B3/10/06 42pp 13/.Jh lift 

34X Fiche 30-267. Ba/10/06, 8910190701 

G21O270104 Forward a 931012 application to amend License DPfl-iH. T*Y HI 
iurve i 1 lance rn.uir ements 

L.EE, D R Put lie Service Co of Colorado Q2/10/1Q CL*HH.R 
Aniitant Director for Operating Reactor* 2pp 15027 090 '4J 
Fiche 90-567,02/10/15,8210270104 

9210270113 Application to amend License PPR-34, changing T-tth typeci 
iniervlce inip S< testing program surveillance requlrenenli 
LEE, R Public Service Co of Colorado 82/10/12 9fp 
ISBS7 OSS 24X Fiche 50-267, S2/IO/ IS, 021 0270104 

B210270118 PropoiBd Tech Specs changes involving reierve ihulJi,ti> 

lurvelllancej prlmarif coolant sys surveillance requirement), 
tendon corrciion k anchor assemblies Iinpl ementatinn schiduli 
& BAR encl 

* Public Sirvico Co of Colorado, 02/10/15 54pp 1302' Oil 
S4X Fiche 50-267. 92/10/19,8210370104 



0. Inspection niporta, IE Bulletins l> correipondence 



9210O50326 Forwardi IE Insp Rept 50-267/98-20 on 820901-31 lid 
nancompliance no tad 

MADBEN, L ClvUion of Resident, Reactor Project tt Englniirii 
program 93/O9/14 LEE.O R Public Service Co of ColoriJ* 
lStOB-301. 24* Fiche 50-267,32/09/16,9210050226 



!tt 



DOCKETED ITEMS 



67 



-B21003O239 IE Insp Ropt 50-267/02-20 on 820801-31 No noncomp 1 lance 
noted Major areas inspected surve 1 1 lance, maint, operat I anal 
safety ver i f icat i an, previous insp f inding s. p lant operations 

DICKERSQN M W . PLUMLEE. G L . UE5TEHMAN. T F Division of Resident, 
Reactor Project t, Engineering Programs Q2/09/10 13pp 
I56OB 311 24X Fiche 50-267,33/09/16,0210050226 

8310060273 Foruards suppl to EE-l 1-0003, flevi s ion 2. "Addl Surveillance 
Weq.uiremt.nts for PCBV Penetrations & Closures." d suppl to 
EE -22 - 00112, Flevision 1, "Inservice Insp ^ Testing Program 
Addl Surveillance Requirements for Steam Generator " 
SREV.H (. Public Service CD of Colorado B2/09/3O CLARK, H A 
Operating Reactors Branch 3 2pp 15621 ISO 24X 
FicfiB 50-267,02/09/30,8210060273 



B21013Q349 Monthly opsrating TBpt for Sept 19B3 

KCBRIDE.L M Public Service Co of Colorado 6B/10/06 
15692 031 24X Fiche 50-267,02/10/06,6210130344 



Spp 



8210190653 Forwards monthly operating rept for Sept 1982 
WAREMBDURO, D Public Service Co of Colorado 02/10/12 
GAMMILL-W P Assistant Director for Operating Reactors 2pp 
15739, OBI 24X Ficho 50-267.02/10/12,8210190653 

8210190667 Monthly operating rept for Bapt 1982 Narrative summary encl 
MCBRIDE.L M Pub He Service Co of Colorado G2/10/06 9pp 
15739 083 24X Fiche 30-267. 82/tO/ 12, 0310190655 



S RBportabla occurrences, LER* Si related correspondence 



aai00602&2 Suppl to EE-ll-0002. Revision 2. "Fort Bt Vrain Addl 
Surveillance Requirements For PCRV Penetrations & Closures " 
Public Servile Co of Colorado B2/09/2B l2pp 15621 102 
24X Fiche 50-267.92/09/30,0210060273 



8210050331 Foruard* LER B2-035/03L-0 Detailed event analysis end 
WAREMBOURQ'D Public Service Co of Colorado 82/09/23 
COLLINS, J T Region 4. Office of Director 4pp 15602 394 24X 
Fiche 50-267, B2/09/23iB2IOOS033i 



--83SO06O2&6 5upp| to EE-22-0002, Revi sion 1, "Fort St Vrain Inservice 
Insp A Testing Program Add] surveillance Requirement* for 
Steam Generator " 

< Public Service Co of Colorado 82/09/23 7pp 15621 194 
34K Fiche 50-267, 82/09/30. 021 OO60273 



0208190233 IE Info Notice BQ-3S, Suppl I, "Leaking I. Dislodged 1-125 
Inptant Seeds " Svc list encl 

COBH.L [ Division of Fuel Facilities, Material 
8?/IO/06 Consolidated Edison Co of Neu York 

24^ Feche 5O-000. 02/10/06, B20BI 90233 



ft Safeguards 
66np 19761 350 



9210380142 Forwards IE Insp Rept 50-267/82-19 on 820809-13 & 0830-0903 
>j notice of violation 

MADS EM, C L Division of Resident, Reactor Project & Engineering 
.Programs 02/10/06 LEE, R Public Service Co of Colorado 2pp 
15837 227 24X Fithe 50-967.82/10/06.8210200142 

--S210380H5 Wotue of violation fvom map an B20B09-13 fc 0030-0903 
* Division of Resident. Reactor Project & Engineering Programs 
Ip S5B37 229 24X Fiche 50-267, 03/ 10/06, 0210200142 



--O2102SO149 IE Insn Rent 50-267/82-19 on 820809-13 t- 0830-0903 
Noncamp I i anc e noted failure to maintain test records of 
sa t oty-re ia ted design changes 

REDANDj R t , WESTERMArJ, T F Division of Resident. Reactor Project 
t Engineering Programs 82/09/29 9pp 15837 230 24X 
Fiche 50-267,82/10/06,8210250142 

0208190238 IE Bulletin B2-03. "Stress Corrosion Crackino in ThicS:- 
Ual 1, Large-Diameter. Stainless Steel , Rec ircu lation Sys 
Plpina at BUB Plants " Svc list encl 

DEVDUNC. R C Director's Office, Office of Inspection and 
En r- or cement 82/10/14 Consolidated Edison Co of Neu Yarfc 

H5pp 15310 125 24X Fiche 50-000,82/10/14,8208190238 

821O27Q104 Foruards 831012 application to amend License DPfi-34, revi sing 
survi 1 1 Idnc e requirement) 

LEE.O R Public Service Co of Colorado 82/10/15 CLARK. R 
Assistant Director for Operating Reactors 2pp 15827 050 24X 
Fithe 50-267.82/10/15,0210270104 

B2I0270M3 Application to amend License DPR-34, chang ing Tech SpacB i-e 
interview insp & testing program surveillance requirement! 
LEE,0 R Public Service Co of Colorado 82/10/12 9pp 
13927 052 24X FlchE 50-267.82/10/15,8210270104, 

B2I0270I1B Proposed Tech Specs changes involving reserve shutdown iga 
surve i 1 lone e, primary coolant sus surveillance requirements, 
tendon corrosion h anchor assemblies Implementation schedule 
f, SAR enc 1 

* Public Service Co of Colorado 82/10/19 54pp 15B27 061 
S4>: Ficoe 50-267. B2/10/15.8210270104 

a31022C"404 Ack receipt of 820819 response to Apa A item of IE 
Em-ergencij Preparedness Appraisal Rept 50-267/82-01 , Addl info 
needed" to complete evaluation of response 

MADBEM, L Division of Resident. Reactor Project t Engineering 
Programs 82/10/19 LEE, R Public Service Co of Colorado 2pp 
63779 ]fiO 24X Fiche 50-267,82/10/19,8210220404 



R Periodic operating reports h related correspondence 



B31013O344 Foruardi monthlu operating rept for Sept 1982 
WrtREMBOUHC. Public Service Co of Colorado 82/10/06 
Director's Officer Office of Inspection *nd Enforcement, Ip 
19682 030 24X Fichu 30-267.02/10/06.8210130344 



0210050337 LER 82-035/03L-0 on 020B27, eng Ins IB of itandbg generator 
get 1A rendered inoperable Caused by indicator lamp i/or 
lamp locket short c ircu iting, causing 15 amp fuse to blow 
in engine IB, 125- volt rfc c ran lino circuit 

FULLER, C Public Sarvice Co of Colorado 03/Q9/S3 Region 4. 

Office of Director Ip 15602 358 24X Fiche 50-267,02/09/23, 
8210090331 

82101V0537 Forwards LER B2-036/03L-0 Detailed event analysis encl 
(JAREMBQURO, D Public Servic* Co of Colorado B2/10/OB 
COLLINS. J T Region 4, Office of Director 3pp 15751 323 24X 
Fiche 50-267,02/10/08,6210190537 

B210I90S43 LER B2-036/03L-0 on 820908, o no of tiao bearing uiater makeup 
pumps removed from svc Caused by need to rebuild mechanical 
leal due to normal uear Seal rebuilt 

FULLER, C Public Service Co of Colorado 02/10/08 Region 4- 

Office of Director Ip I57S1 326 24X Fiche 50-2A7, B2/10/08, 
82 101 90537 

B210I90547 PND- IV-B2-037 on 821013. Intfi cation of increasing reactor 
faldg activity & decreasing regeneration train pressure 
occurred Caused by gaseous radioactivity leaking from 
flanaed line in A purification train 

WESTEHMrtN.T F . MADSCN. L Region 4, Office of Director 83/10/13 
Ip 15731 360 24X Fiche 50-267,82/10/13,0210190547 



DOCKET 50-269 OCONEE NUCLEAR STATION, UNIT 1 

F Sicuritij, medical, emergency !t fir-e protection plant 

8210010352 Forward revision to tafeguardt contingency plan Revision 
withheld <raf 10CFR73 21) 

TUCKER, H Q Dufce Pouer Co 82/09/17 DENTON, R Office of 
Nuclear Reactor Regulation, Director Ip JB574 139 34 X 
Fiche 50-267,32/07/17,8210010352 

0210960529 Agrees u/determination to locate fire hose itationf outside 
affected fire aren Change from earlier commitment 
acceptab 1> 

STQLZiJ F Operating Reactors Dranch 4 82/09/33 TUCKER* H B 
Duke Power Co 2pp 15B30 IS? 34X Fiche 30-269,82/09/23, 
B2LOZ&OS2? 

B210040S3H Application to amend Licenses DPR-3B, DPR-47 b DPR-53 Amnd 
rei{ue*ti deletion of Tech Spec 6 4 2 re site emergency drill 
& definition of time uithin iiihlch redundant component test 
mutt be performed prior to performing malnt per Tech Spec 
TUCKER, H,B Duke Pouer Co 02/09/27 DENTON,HR Office of 
Nuclear Ftiactor Regulation, Director 3pp 15386 104 24 X 
Fiche 30-269.82/07/27,8210040832 

8210040349 Proposed revision to Tech Spec Pagei 3 3-6 & 6,4-1 r> sitt 
mergincv drill t timt period within uhlch redundant 
componenfc tut must be performed prior to perPorminfi maint 
t Duke Power Co. 02/09/27 4pp, 159B6 107 24X 
Fiche 50-269,82/09/27,8210040232 

P Operating license itige documents !< correspondance 

6203130356 Forward i task force on pressuHied thermal shock audit of 
Rub In ton plant re adequacy of in-plant training programs 
& operating procedures NRC uill conduct timilar audit at 
Bruniiuick plant. 

NOVAK. T K Aislitant Director for Operating Reacton. 83/04/23, 
PARKER, WO Duke Pouer Co, 2pp 13089038 34X 
Fie he. 50-269, 83/04/23,8303130336 



68 



DOCKETED ITEMS 



B21G08QQ36 Rp ondl to FOIA rtnurst for document* re pin* designed to 
hold neutron iMelding pads In place under Accident 
c ondt tiont- Forwards documenti lilted on App A 

FELTON.J M Division of Rule* and Recordi B3/OB/13 EDDLEMAN. W 
Public Interest Research Or cup in NOT in Carolina 2pp 15A69 240 
24X Fiehe 50-269, 92/00/13. B2100S0036 



lal respnnse to Franklin Research -Ctr draTI 
apt re control of heavy loadi<ptr 



82IOIB0060 Foruai-di pa 
technical t valuation 
HUREO-0612 

TUCKER. H B Duke Power Co 82/lQ/OB DENTQN, H R Off let at 
Nucliar Reactor Regulation, Director 9TQLZ. J F Operating 
Reactor* Branch 4 5pp 15730011 34X Flche 50-269, E2/JQ'C3 
B2101800S5 



S2IOOB0044 Notification of B11Q09 meeting w/util in GethesdJ.MD to 
dlicun broken therm*! ihltld bolt* in Unit 1 

UAQNER.P C Operating; Reactors Branch 4 81/1O/O5 BTOLZ.J F 
Operating Reaction Branch 4 2pp 15669 263 24X 
Flche 50-000, B2/QB/13, 82100BOQ36 

8209250417 Discusses broken core barrel assembig thermal th U 1 d bolts 
at Occur* 1 J. appl itab lit tu to other BW pUnti Imp of 
OconeB 3 & other B6W plants iif/thermal shield bolts made o-f 
nme mails r*c ommended 

CLSHINSK.!, J A Division of Engineering 6 Technical Programs 
B2/03/29- EIBENHUT.fl O Division of Licensing 4pp 13669 285 
24X Fiehe 50-000,82/0-9/10.8210080036 

8210Q101O7 Atfvfsei that util response to MIC B2O21B Itr ul 1 1 be 
provided by BZ10QB Receipt of Info from crane vendor (t 
ei traord 1 nari| analgtfca) work have delated response 
TUCKER. H B Duke Power Co 82/09/24 DEN TOM, H R Office of 
Nut liar Reactor HaguJatl on* Director STQLZj-JF Operating Reactors 
Branch t Ip I 35BI 034 24X Ficfi* 30-269, 82/09/24, 8210040 107 



B21QaiQ13l Responds to NRC 820908 Itr transmitting technical evaU*1 
rept on emergeniu feaifuiater ius Siji may nut meet all current 
criteria for seiimic nual ificat ion. bu t will remain 
funct i anal lij operabia during ODE 

TUCKER, H B Duk Pouar Co B2/10/13 DEN TDM, H R Dffitt of 
Muclear Reactor flegulation. Director STdLZ. J F OnBralma Raiit 
Branch 4 4p p 15766356 2flX Fiche 50-2i9, B2/ 10/13, 0310210131 

aai021040>7 Application to amend OLnrevlsina Tech Spec 3 1 allculri 
Full ;ouer operation of Unit 1 for interim period until 
appropriate tafctv valve ring settings can be implemented 
TUCKER- H Q Duke Pouar Co 93/10/14 DENTON, H R (IfHct 0' 
Nuclear Reactor Regulation, Director STOLZ,JF Operatlnij Ruti 
Branch * Bj>p 15764 030 24X Fiche 50-269, 02/10/14, 



B2IQ2JO4I1 Propoied revision to Tech Spec 3 1 allaiuing full pa 
operation of Unit 1 for interim period until approprut* 
safety vajve ring setting can bo implemented 
* Duke Pouar Ci> B2/1O/I4 Ip 13764 043 24X 
Fich* 30-2A9. 02/10/14,0210210407 



8210040232 Application to amend Licenses DPR-3B, DPR-47 & DPR-55 Amend 
requests deletion of T*cti Spec 6 4 2 TI lit* emergency drill 
I, definition of time mi thin which redundant component tv*t 
must tta perfnrnifif prior to performing malnt per Tech Spec 
TUCKER. H D Dukt Pouar Co BSfWfS? DENTON, H H OfPlea of 
Nuclear Reactor Fteoujatl o-n, Director 8TOLZ.JF Operating Reactors 
Branch 4 3y p IS5B6 104 S4X Fiche 50-349,63/09/27,9210040233 

9210040245 Proposed revision to Tech Epic Pages 3 3-4 t 6 4-1 re Bite 
emtrgencij drill b time period within uhlch redundant 
component test must be performed prior to performing malnt 
* Duke Power Co B2/&9/27 4pp 15596,107 S4X 
Fiche 50-269, B2/09/27, B2IOQ40232 

9210190143 Foruard* Amends [13,113 & 110 to Licenses DPR-3B. DPR-47 h 
DPB-55i respec tlvelu, saf ty evaluation 1 nptlce of Issuance 
& availability Amend* rtviia Tech Specs to allow ful] poui*r 
operation of Unit 3 during Fuel CijclB 7 

WAQNERp P C Operating Reactors Branch 4 BS/01/Sf TJCKER, H 
Cuke Power Co 2pp 15737 341 34X Fiche 50-269, 02/0 9 fSI. 
B210l90i45 



--S210I70154 Amends 113,113 t< 110 tn Licenses DPH-3B, DPR-47 b 
r*spectivel y> nvi ling Tech Specs to allow full power 
operation of Unit 3 during Fuel Cycle 7 

STOL7.J F Operating Reactors Branch 4. 82/07/39 31pa 
J5797 343 S4X Ftche 30-2i9, 02/07/29,621 0190145 



-82101 90 l&l Safety evaluation supporting Amends US, 113 & 110 to 
Uctnsut DPR-38, DPB-47 J: DPR-55i res pectivetij 
Office of Nucltar Raactor RflguUtlon. Director B2/09/29 
1S75S-012 E4X Fiche &0-Sfi9.Ba/09/a, 6310190149 



Inspection report*, IE Bulletins & correspondents 



62100)70007 Responds to FDIA request for Bight cabegoi-ies of rocor^ 
steam generators b ate*m turbines App A documents provided 
in R Udell FOIA Request 01-313 Forwards documents listed in 
App Q 

FELTDN.J M Division of Rules and Records B2/08/10 I 01 JO. -f 
Ulnthrop, StimsoTi, Putnam & Roberts ?pp 15645 Qb3 J4* 
Fiche 5O--000, Sa/08/10, B210070007 



9210070172 Forwards info re iteam generator integrity t tnip* 
operating P(VRi,per 750320 4 21 requests Details of Lnipt. 
including defect indica tions. tube plugging criteria & tubei 
plugged will not be provided except for Paint Dcctch I 
COLLER,K R Division of Reactor Licensing (NRR-1775 niilu.1 
7S/03/S4 MACCrtHV.R R Division of Technical fleviau tNFW- 
onluj 5pp 1S&4S 196 34X Fiche 30-000, S2/OB/IO, ( 



ipp 



B210150369 Foruard* results of investigation of Item 7s of ]C l 
R.pti 50-269/32-21,50-270/02-21 t, 5O-2B7/S2-21 Defldtime 
values for gamma ipactroscopij analuses of waste gas silver 
leollte crtridg>* ui 1 1 cause onlij insignificant errors 
TUCKER. H Duke Power Co 82/QB/17 O'REILLY.J p Haolan 
Office of Director 2pp 15704 369 24X Fichu 50-a&9, 
B2 1015030?, 



0210-0-1OI17 Foriuardi IE Insp Repts 50-269/02-33, B0-a70/03-3a t. 

50-397/82-33 on B2O817-20 No noncomp 1 lance noted 

DArfC-E.H C Diviiion of Project fa Resident Prooraml 03/01/02 

TWCKERjH D Duke Power Co 2pp 19366 019 24X 

Fiche 30-269. 82/O9/Q2, B2100101 1 7 



--82IO170169 Notice df issuance b availability ofAminds 113. 113 fc 110 to 
Licenses DPR-3B, DPH-47 h BPR-55,, Tltpectivelu 
BTOLZ.J F Operattnfl Reectors Branch 4 B2/0?/H9 Spt 
1B7&B O1S 24X Ficne BO-24.9, B2/07/29, B21 0190145 

32101B0323 Responds to B209I3 Itr re reactor bldg purge lui Position 
given in BJ0707 fc 17 6trs remains unchanged Schedule for 
submitting info Indicating purge sijs miets op-erabil 1 tij 
reqiilTeiriBnt* reqtieitad 

LAINAS.8 C Assistant Director for Operating Reactor* B2/09/30 
.. . - - Co 3pp 

10130323 



B21Q010124 IE Insp Repts 50-269 /B2-33, 30-27 O/S3-33 i. 30-aD?/na-3J 
on B206I7-2O No noncomp 1 lance noted Major areas inspected 
action on pravlous nforcmnt matters, au 1 1 iaru fadwlr 
header repair & Inservice insp procedures 

CRQWLEY. B R. , BLAKE. J J Division of Eng ineenng t. Tictmltdl 
Proorams 82/O9/01 Bpp 15566 021 34X Fiche 30-26 1 ?. Q3fGtn.l 
8210010117 

&ai001019B Foriujrdi IE Insp Repti 30-269/83-30,50-270/03-30 ! 
30-237/82-30 on 820716-0310 No noncomp 1 ianc e noted 
DANCE.H C Division nf Project d Resident Programs 03/09/02 
TUCKER, H D DukB Pouer Co 3pa 1 5367 23B 24X 
Fichs 30-H69, ea/09/02,Q2100101BB 



ongoing NRC restarcli prosram 
il m Facilitg 
W NBG3 plant 0cliri 

Office of 

Diviiion of 
/07.B210130137 



--B21001O!6i IE Insp ftepts 50-269/82-30,50-270/82-30 b SO-HOJ/BS-K f 
G2O71&-OB1O No noncompHance noted Major areas inspected 
operations* surveillance testing, maint.NUHEG-0737 moid t 
refueling activities 

ORDERSjW , FALCONER, D , BRYANT, J C Division of Project b Ruifr 
Fro-grami G3/O9/02 t3pp 15567 HiO 24X Fiche 3Q~St-1.aSf01.-S 
BS10U1013B 



re adequacy of 
Info 

Jffice of 
rating Raactors 
B210I80055 



eaiOOiO45B Aek rceipt of 82080S Itr informing NRC of stepi t*li 

correct violations noted in IE Insp Rapti 5~0-2&9/B2-!!3, 

30-270/82-23 t, 90-2B7/S2-23 

LEWI8.R C DivHio-n of Project (. Resident Programs 82/09/1? 

TUCKRrH. B Duke J>our CD Ip, 1557O 182 24 X 

Flche, S0-2i9r 82/09/17. 821 001045B 



DOCKETED ITEMS 



69 



--B2IQ010463 Responds to NUC 020712 1 tr re violations noted In IE Inep 
Beptt 50-269/82-23. 50-370/63-33 !. 50-2B7/82-23 Corrective 
actions personnel counseled ! valve 2HP-1 4 cut out d 
properly reinstalled 

TUCKER. H JJ DU*B Power Co 82/00/05 D 'HEILLY, J P Region 2, 
Office of Director Ipp 15570 1B3 24X Fiche 50-269, 82/O9/17, 



rwards IE Imp Repts 50-269/82-23. 50-270/82-33 t- 
50-237/82-23 on 830510-0610 ', notice of violation 
LEWIS, R C Division of Project I. Resident Programs 0S/07/12 
PAHllEFf, W Q Duke Pouer Co 2pp 1 557O 187 21X 
Ficlie 5Q-3A?. 82/09/17, 8210010458 

B210O10471 Notice oF violation from insp on B20510-0610 

DivisiOTi of Project & Resident Programs 82/O7/12 3pp 
15570 189 24X Fiche 50-269,92/07/17,8210010458 

SaiOOl047fl IE Inap Repts 50-267/B2-23, 50-270/B2-23 t, 50-307/02-23 on 
320510-0610 Moncomp! lante noted Failure to f o 1 1 ou procedures 
resulting in plant trip fc Inadequate procedure resulting in 
Improper reassembly of safety-related valve 

QFfDEfiS.W , FALCONER, D . BBVAHT, J C Division of Project b fiosidunt 
Programs 92/07/09 ISop 15570 191 24X Fiche 50-269, 82/09/17, 
S21001045B 



8210190552 Monthly operating fepti for Sept 19B2 

REAV1S.J A Duke Power Co 82/10/13 16pp 157S1 344 24X 
Fiche 50-269, 92/10/15,9210170544 

S Reportable occurrences. LERs !< related correspondence 

B21015Q07 1 ? Forwards LER 81-001/O3L-0 Detailed event analysis ancl 
PARKER, W Dufce Power Co ai/02/04 O'REILLV.J P Region 2, 
Atlanta. Office of the Director (Bl/03/01) 3pp 13697 Oi3 24X 
Fiche 50-26?, 81/02/01,8210150079 

B3101500B4 LER B1-001/03L-0 an 810105, turb i ne trip from 90X full poujor 
occurred Cauaed bij loss of excitation on generator Field 
resulting from mismatch during personnel attempt to rail? 
volt amperes reactive on Units 1 ti 3 

JONES, J L Duke Pouer Co Bl /OS/04 Region S, Atlanta, Office 

of the Director (Bl/03/01) lp 15677 066 34X 

Fiche 50-269,81/03/04,821015007? 

8210010009 Responds to FOJA request for 19 categories of document* re 
nuclear reactor events & safety problems Forwards documents 
listed in App A 

FELTDN, J H Division of Rules and Records 83/06/28 UDELL, H A 
Critical Mass Enemy Project 15pp 15727 005 24X 
Fiche 50-000, 82/06/2B, B2100100QB 



5^10150253 Forwards IE Insp Repts 50-269/82-32,50-270/82-32 t> 
50-237/62-32 on 830817-18 No noncomp 1 lance noted 
DAMCE.H C Division of Project '. Resident Programs B2/09/17 
TUCKER. If B [Juke Power Co 2pp 15703 267 21X 
Fiche 50-269,83/09/17.6210150253 

S2tQL5Q263 IE [nap Rapts 50-269/B2-32, 5O-270/82-32 t, 50-307/02-32 an 

920Q17-1H No noncompl iance noted Major areas inapected lab 

-Qr, & review of rad inchemistri) procedures & recorda 

EVflNB, C D . MONTGOMERY. D M Division of Emergency Preparedness ti 

Operational Support B2/09/ I S 3pp 15703 269 24X 

Fichu 50-269, B2/07/I7, 8210150253 

621015-0(3! Forwards IE Insp Repts 50-269/B2-35, SO-270/92-3S t" 
50-SB7/D2-35 on 820900-10 No noncomp 1 iance noted 
BAMCE. H C Division of Project d Resident Programs B3/09/23 
TUCKER. H Q fluie Power Co 2pp 15698 313 24X 
Fiche 50-2&7. S3/09/23, B2101 50131 



8210040374 Forward* LER BO-20/03L t HD 2&9/BO-9 re failure to open 
auilllarij feeduater valve & failure of fire detection 
i^Si respac t ivelij Addl attention ma<j be uiarranted 
BENDER. H ACRS - Advisorij Committee on Reactor Safeguards 
SO/03/23 FRALEV.R F ACRS - Advisory Committee on Reactor 
Safeguards lp 1S727 373 24 X Fiche 50-OOO, 82/06/28, 821 001GOOH 

8210190653 PHO- I I-B2-1 1 1 an 02tO14,Unit 2 shut doun after determinlno 
that presiurlier code safety valve design flou could not be 
fullg maintained if called upon Seven-dag outage required 
to change valves Exemption requested for Unit 1 

IONATDNI8,A , DANCE, II C Region 2, Office of Director B2/IO/14 
2pp 1574O 036 K4X Flche 30-369,82/10/14.8210190653 

0210290353 Forwards UEFi B2-OI4/03L-0 Detailed event analysis encl 
TUCKERiH D Duke Power Co 82/10/14 Q'REILLY.J P Ren'on 2, 
Office of Director, 3pp 15353 043 24X Fiche SO-269, 82/10/14, 
B2 10290355 



--S21O150113 IE Insp Rcpls 30-269/83-35,50-270/62-35 J. 50-237/83-33 on 
820908-10 No noncomp 1 iance noted llajor araas inspected 
RCS leakage calculations 

DUFJNETT, P T , JAPE, F Division of Engineering * Technical 
Program* 83/09/31 4pp 1 S69a 311 24X Fiche 50-269.02/09/23, 
0310150131 



82102?0363 LER B2-014/03L-0 between 820616-0930. reactor bldn cooling 
unit fan 1A tripped on loin cpeeri thermal overloads seven 
times Cause untnoun Fan under surveillance Fan motor may be 
replaced If cauil of trips cannot be determined 
PETTV.J C Duke Pouer Co 82/10/14 Region 2, Office of 

Director lp 1SB53 046 34X Fichu 30-269, 03/10/14, B31029O355 



) .Requests relief from inscrvlce imp requirements 
(hvdrstfltie J of Section XI of ASME Boiler b Pressure Vessel 
Code 

TUCKER. H D- Duke Power Co 02/10/04 DEN TON, H H Office of 
Nut lear Reactor Regulation. Director STOLZ.JF Operating Reactori 
Branch 1 20pp 15678 243 24X Fiche 30-269r 83/10/O4, 821O1 30290 

02Q31VQ233 IE Info Notice 00-33, Suppl 1. "Leaking & Dislodged 1-125 
Implant Seeds " Svc list encl 

CODD,U I Division of Fuel Facilities. Materials & Safeguards 
O2/KVQ6 Co.nsalldate<f Etflann Co of Neu York 66pp 15761 250 

2flX FichE 50-000,03/10/06,8308190333 



8210290WO Forwards LEU B2-01S/03L-0 Detailed event analy.is end 
TUCKER, H D Dule Pnuer Co S2/1O/15 O'REILLY, J P Region B. 
Office of Director 3pp 13953 307 S4X Fiche, 30-269,02/10/15. 
8210290190 



021029019? LER S2-019/03L-0 on B20917, rsactor protection SUB trip 
pushbutton declared tecbnlcallg inoperable Caused bg 
procedure deficiency which did not include required test, 
Necessary procedures changed 

PETTY.J C Dufce Pouer Co B2/IO/15 Reginn 2, Office of 

Director lp 15853 290 R4X Flche 90-269, 82/10/13,8210290190 



B2 10220426 Forwards Revision 5 tn response to IE Bulletin 79-02, "Pipe 
Support Base Plate Designs Using Concrete Expansion Anchor 
Dolt! " 

TUCKER, H a Du*e Pouer Co 82/10/08 O'REILLY, J P Region 2, 
Office- of Director 24pp 15778273 24X Fiche 50-269.82/10/00, 
02SO320426 

E+2101902H9 EM-S2-03IA on 83)013, order imposing civil monetary penalty 
Issued to licensee Action based on failure to follow 
procvdures affecting safe operation of facility 

nARBEfl>G j AXELRAD.J Director's Office, Office of Inspection and 
Enforcement 02/10/12 lp 15701 319 34X Flche 50-269,02/10/12, 
8210150285 

BSOB19O23a IE Bulletin 82-03, "Stress Corrosion Cracking in TNick- 
Wal 1* Large-Diameter. Stainless Steel, Rec ircu lati on Su.s 
Piping at DWR Plants " Svc list end 

DEVnUNO, R C Director's Office. Office of Inspection and 
Enforcement B2/IQ/14 Consolidated Edison Co of Neul York, 

115pp 15S10 125 24X Fiche 50-000, 82/1Q/ 14. 0208190238 

=1. Periodic operating reports fc related correspondence 

3210190544 Forwards monthly operating repts for Bept 1982 

TUCKER. H B Dute Power Co 82/10/15 Director's Office, Office 

of Inipectfon and Enforcement lp 13751 343 24 X 
Fiche- 30-269. 82/10/1 5, 8210190344 



DOCKET 50-270 QCQNEE NUCLEAR STATION, UNIT 2 

A Application/construction stage documents b correspondence 

0210010000 Reiponds to FOIA request for 19 categories of documents re 
nuclear reactor events fc safety problems Forwards document* 
lilted in App A 

FELTON. J, M Division of Rules and Record! 02/06/20 UDELL. R, A, 
Critical Hail Energy Project ISpp 19727 005 24 X 
Ftche- 50-000, 82/06/88, 8210010008 

B204290048 Recommend* prompt attention b> given to problem of reactor 
coolant pump closure stud corrosion detected at facilities, 
Response by 8204IS requested 

EISENHWT, D Division of Licensing 62/03/24 HAMAUER. S H 
Division of Systems Integration (poit 011005} 3pp, 15745 370 
24X Fi che: 30-000. 82/06728, BSi 0010008 

F Security* medic*!, emergency d fire prnttttlon plni 

8B10010352 Foruards revision to tafvguards conttngency plan Davit ion 
withheld (ref 10CFR73 21). 

TUCKER.H.B Duke Pouir Co 62/09/17, OENTQN, H R Office of 
Nuclear Reactor flegulation. Director lp 19574 139 24X 
Fie he- 50-269, 02/09/17,8210010332, 



70 



DOCKETED ITEMS 



9210260 929 Agra*] u/determinati on to locate fire hate stations outaide 
affected fire araai Change from earlier commitment 
aceeptab 1 e 

STOLIiJ F Operating Reactor* Branch 4 92/09/23 TUCKER. H D 
Duke Pouier Co 2pp 15B30 [87 24* Fichu 30-269. 02/09/23, 
62 10540329 

9210040332 Appl (cation to amend Liotises CPR-3a,CPR-4/ i DPR-55 Amend 
penuests deletion of To eh Spec A 4 2 i* lite emergency. drill 
& definition of time within which redundant component test 
mutt b-e performed" prior to performing mainfc per Tecti Spec 
TUCKEB.H D Dukt Pouigr Co B2/09/27 DENTCrf, H H Office at 
Huclear Reactor Regulation. Director 3pp 15586 104 34 X 
Flche 50-867,82/09/27,6210040533 

821Q040245 Proposed revision to Tech Bpec Paoaa 3 3-6 & 6 A- 1 re Hita 

mBrginciji if MI I 6 Clra period uJthin uhich rntfundant 
component tut must bo performed prior to performing malcit 
Dukv Power CD 92/09/27 4pp 1550*. 107, 34X 
Flche 30-267,63/09/27,3210040233 

P Operating licent-t itage document! ! corraspondence 

B210QBQ036 Responds tn FDIA Pequest for documents ro pins dailunaQ to 
hold neutron shielding pads In place under accident 
cond ( tlon-i Forwards documents lilted on App A 

FELTOH. J M Diviiian of Rul and Record a Ba/OB/13 EDDLEMCvH,M 
Public Interest Resear-ch Group in North Carolina 2pp 19669 340 
24X FIcho SO-SA7, 82/OB/ 13, B2100BOQ36 

B21O04QI07 Advia that util TPi(>Dnie to NRC 820318 1 tr ulll be 
provided by 921009 Receipt of info from crane vendor fc 
eilraord I hary analytical uori have delayed retpunie 
TUCKER, H 8 Dukt Pouer Co B3/09/S4 DEHTDN, H fl Office of 
Muclfar ila*ttor Regulation, Director STOLZ, J, F Operating Reactors 
Brcicn 4 Ip 18581 024 SflX Fleha 50-269,62/09/24, B2I0040 1O7 

aai0010S32 Application to amend Llcrnie* DPH-3B. DPR 17 { DPfi-55 Amend 
rcquett* deletion "f Tech Spec 6 4 2 rs lite emerg^nc y drill 
t definition at tlma ulthln uhlcli rariondant component tt 
mu it be performed prior to ptrfc-rmins mjint per Tech Spec 
TUCKER, H D DuV Power Co 62/09/27 DEMTCM, H R Office of 
Nuclear Reactor Reoujatton. Dlpectai- 8TOL.Z,JF Qperatlna Heactpra 
Branch 4 3pp 135B& 10<t 24X FSch *, 50-869, 82/0-9/27. 0210040332 

62100402'lg Propoei) r*viion fco Tech Bpet P9 3 3-4 h {, fl-1 ITE sits 

iMrgiricti drill (. time period within uhich redundant 
component teit must be -performed prior to pur forming nmnt 
Duk. Pou.r Co B2/09/2? ^pp 1S3&6 107 34X 
FUhe SO-S 



respons 



B2IOJ90I45 Foruiardl Amend* 113,113 te 110 to Liceniei DPa-3B.DPR-47 t, 
DPH-33. respect iveli/, safety evaluation 'j notitf of 1-giuance 
J. *v tlab i 1 i tij Amends revise Tech Bptcs to allou full pouier 
operation of Unit 3 during Fuel Cycle 7 

WAGNER, P C Operating Rsactor* Branch 4 B2/09/B 1 ? TUCKER. H D 
Dukt Pouer CP. 2pp 1S797 341 84X Flchi: 30-269, Ba/O9/29, 



8210190154 Amndl 113.113 4 110 to LicinUt DPR-3B, DPR-47 ti DPR-59, 
rapetlvelij, reviling Teck Spaci to allou full pouiar 
oparatlon op Unit 3 during Fuel Cgela 7 

BTOLZiJ P. dpBYitlng Reactors Branch 4 S2/0?/29 3lpp 
4a 24X Tlche 80-3^9,83/09/89.6310190143 



0210190161 Ba*ti| evaluation mpporttng Amend* US, 113 t, 110 to 
Llcinie* DPH-aa, DPR-47 tt DPR~59,rpectivelij, 
* OPfite of (Juc.l*T Ruetor Re?ul*tiinii, Dlrictor B2/09/29 
137SB O1S 24.K Fich* 30-311. B2/09/B7, BZ10I90I4S, 



App 



BaiOl901(,7 Notice of iituanct i. avaflalilUtu of Amnd 113, 1 1 3 fc 110 to 
LUiniet DPR~3BrDPR-47 & DpR-33, reipectlvel i 
srOLZ.JF Operating R*etari BraneN 4 B2/09/2 1 ? 
1B75B 018 24X FUhe; 30-247. 82/09/29.B21019014S 



Bop 



Reipondi to B20913 Itr r reactor bldg P UTOB iyt fotition 
giVTi In B107Q7 t 17 Itrt i-tmaim vnchanged, Bcheduli for 
tubtfiitttni) info inif(c*lna purge nji mitii opirabillta 

82/O9/30- 



LAIMAS, O.C flt(Ut*nt DirEtar for Operating flactor 
TUCKERrH. B. Out* PngT Co, 3pp. 15745:33* S4X 
Fieh 80-369.82/09/30,6210190323 



satOlBOOSS R*ponidi to NRC B20&QB reiiut for add! Lnlo n dasuac 
itatlon electric diitrlbutlen Kit voltagu, Riouittd in.# o 
Kftftttd by 621022. 

TUCKER, H B. Dutf Powti- Co. ea/10/OB. DENTON.M R Offlct Cf 
Nuclejr Rector RefluUtlan, Dinctor, aT0U,JF Operating nnn 
Branch 4, IB, lS7ao.010. 24X Fiehl- 5ft-2o9,B2/lO/OB, 9210180038. 



eaiOlBOOfcQ Forwards partial 

technical evaluation rupt .. ,, , 

UUREO-0612 

TUCKER, H B- Duke Pnuer Co B2/10/O8 

Nuclear Re-actor Regulation, Director 



Franklin Research Ctr ! 
if heavy I odd t, per 

DENTOW, H ft DfF,ce i 
STOL2. J F Cp.ratsng 



6210210131 Re fi p on(! , to NRC B3090B Itr transmitting t ec hn,c a ] ,v.lu,( 
rept on .m.rg.ncy feedwater y, S, mav not mB / t ^, t *! ' * 
criteria for leilrnic qua I if ication, hut ui 1 1 remain 
functionally operable Hurinp QBE 

TUCKER. II D Duki Pouier Co B2/10/13 OENTON. H R Of He, of 
Nuclear Reactor Regulation, Director SrQL*,JF Dpr*ttn 9 Bf.e* 
Branch 4 4p o 1 976A 356 24X F.che 50-269, B2/ loySi aa!IOiai 

B210210407 AnplUation to antvA DLs.revj.ing Tech Spec 3 l a |]oiT-. 
full power operation O f Unit I for interim period until 



DENTON. H R Offlc* ct 
STOLZ. J F Op.ral , n . Ft, 
50-369, 



iiBn s 

TUCKER. H D Dol* p Dule r Co 82/10/14 

Wuciear H,, e t or fl. 9U latin, D!rector 

Branch 4 Bpp i5764 038 34X Fiche 



8210210411 Propoxed revHion to Tech Spec 3 I al lomng full 
operation uf Unit 1 for inter im per iod until appropriate 
safity valve ring setting can be implemented 
Outa Pouer Co B3/1Q/14 Ip 15764 04B 34X 
Flche 50-2i9, aa/10/tl, 8210310407 



Inspection reports. IE Bulletins t correspondence 

9210070007 Reapunds to F01A requeit for eight catenon*. , 
item generators i itetin turbines App A documents pravii 
in R Udell FD Ifl F1eq.UBst ai-313 Formards documents llttei 
App B 

FELTON.J fl Division Of Rules and Records 02/09/10 
Hinthrop, Stimson, Putnam & Roberts 9pp 15645 063 
Flche SO-000, aa/Oa/10. B310070007 



LOW, D 
34X 



-i .1 



B2I0070172 FcTLUrdt info ra iteam oenerator inteoritii (, ! 
operating PHR,oer 75O330 fe 21 request, Details oAnis,, 
Including Jafeit inrflca tions, tube plugging criteria & tubii 
plugged uill not be provided ejcept for Point Beaeli I 
OOLLER.K R Division of Reactor Uicensing (NRR-1975 c-nlul 

73/03/21 MACCftRV.R R Divismn of Technical fi e v( e ftfla-igj' 
onlyl 9pp. 15445 196 24X Fiche 50-000. B2/Osy 10, aai007QOO7 

8S101S0349 PoruiarJt r.aults of invest, os t, on O f j tVT! ?4 of , E ,,. 
Hepti 50-BA9/ea-21,&0-270/83-2l fc SO-2B7/B2-21 Daadtlrre 
values Fop gamma ipectroscopu, analyses of uaste gas ti lv*r 
leollte cartridges uill cause only insignificant irror* 
TUCKE,HO Duke Pouer Co H2/OB/17 O'REILLY.JP Iteolan 3 

' Ct0r app 157 4 2i * 24X FlqnB 50-269. BB/Oa/U. 



8310010117 Foruardi IE lusp RepU 30-369/82-33,30-270/82-331; 
30-207/92-33 on B20ai7-20 No noncompllsnce noted 
2fS H :, C - Dfvi ' ll n op Project fc Resident Program. 
TWCKER.H D Duke Power Co 2pp 15566 019 sax 
Flche- 50-269, 83/09/02.8210010117 

8810010184 IE Insp Rents 50-269 /B2-33, 3D-S70/B2-33 4 50-287/83-3* 
nn 020917-20 NO noncomp 1 ia n ce noted Major areas iTiipectld 
action on previous enforcement matters, au . i 1 1 airy f.edujOr 
head-er rapair t> Jniervlce ittip procedures 

R , BL.AKE.J J Dwliion of En H ine*rlns t T.chnle.l 

* 



B2100101SB For-uiardi IE Insp Rcpti 30-2i9/B2-30, 50-270/82-30 L 
30-237/82-30 on 8S07[i~OaiO Ho noncomp 1 ianc e noted 
OANCE.H.C Division o* Project lifiesiilent Proarams 
TUCKER, KB Duke Pou,ar Co Spp IS567 S5S 24? 
Ficne SO--S69, Ba/09/02, B21001015B 

0310010166 IE Imp Reipts 50-269 /aa~30. 50-370/83-30 - 

G20MA-QS10 Mo nt.ncoflipli.hce noted M.jor ar. al inspettetf 
operationi. survHUanci testlno-malnt.NUREO-O737 mods tr 
refueling ictivititt 
ORDERS, H-, FALCONER, D , DRYftNT. J C Diviiion of Projec 



6310010433 Aek receipt of B20B05 Itr informins NRC of item 
torrtct violation, noted in IE Inp Reptf 50-fl6?/B3-33 
90-270/B2-S3 ti SO-aB7/0a-23 -*w -IJ, 

LEHIS.R.C. Divl*ion of Project S< Resident Progcams 
TUCKER, H B Duke Power Co ip 1SS70.1B2 24k 
Flche: 90-847, B2/09/17, 821001043B 



DOCKETED ITEMS 



71 



-B2-100104&3 Responds to NRC S207I2 Itr re violations noted in IE Insp 
flept( 5O-3A9/S3-23, 50-27O/92-23 ft 50-207/B2-23 Corrective 
actions personnel counseled t> valve 2HP-14 cut out & 
prop IT ]<t re installed 

TUCKEfl. H B Duke PniuBr Co 92/09/05 'REILLY, J P Region 3, 
Office of Director 4pp 15570 183 24X Fiche 50-269,03/09/17, 
93100 I 045B 

-6210010468 Forward! IE Imp Repts 50-269/B2-33, 5O-270/B2-23 81 
SQ-S87/S2-23 on B2O510-0610 t, notice nf violation 
LEWIS, R C Division ot Project t Resident Programs 62/07/13 
.PARKER, W Duke Power Co 2pp 15570 187 2flX 
Ficne 50-269,82/09/17. B2100I045B 



--B210Q10471 Notice of violation from map on B20'!10-O610 
* Division of Project f. Resident Programs 92/07/12 
15570 109 24X Fichfl 50-269. 92/O9/ 1 7, S21O01045B 



2pp 



--B2I0010474 IE Insp Flepts 50-269/B3-23. 50-370/82-23 & 50-287/82-33 on 
B-aOSIO-OSIO Noncnmpllance nntcd failure to follow procedures 
resulting in plant trip & inadequate procedure resulting In 
improper reassembly of safety-related valve 

CrtDEflS.W . FALCONER. D , BRYANT, J C Division of Project << Resident 
Program 82/07/07 12pp 15570 191 SIX Fiche 50-269, B2/09/17, 
0210010453 



Forwards IE Insp Repts 50-269/82-32-30-370/82-32 & 
50-267/82-32 on B20B17-IB No noncornp I lance noted 

DANCE, H C Division of Project t> Resident Programs 82/09/17 
TUCKED. H D Duke Power Co 2pp 15703 267 34X 
Tithe 5O-269. B2/09/17. B21O1 50253 

6210150363 IE Insp Repts 5O-269/B2-32, 50-270/82-33 fc 50-267/82-32 on 
O2O817-IS No nancompliance noted Major areas Inspected lab 
QC (- revlou of radi ochemi stry procedures i records 

EWiNS.C . MDNTOGMFRV. D II Division of Emergency Preparedness i 
Operational Support 82/09/15 3p p 1*1703269 34X 
Ficlie 50-269, B2/09/17, 9210150233 

&21O150131 Forwards IE Insp Repts 50-269/62-35.50-270/82-35 (. 
3O-287/B2-39 on B2090B-10 No noncompliance noted 
DrtlJCE, H C Division of Project i Resident Programs da/09/23 
TUCKED, H D .Duke Power CD 2pp 15698 312 24 X 
Fiche 50-269,63/09/23,6210150131 

-'0210150143 IE Insp Repts 50-369/92-35, 50-270/82-35 *< 30-2B7/B2-3B on 
830908-10 No noncompl lance noted Major areas inspected 
fiCS leofcags calculations 

BURNETT, P T . JAPE. F Division of Engineering ( Technical 
Projrams 02/09/21 4pp 1 569B 314 24X riche 50-S69. 82/09/23, 
6210150131 

Q21OI30290 Requests relief from Inservite Insp requirements 
iftigdrosta t lei of Section XI of AS HE Boiler t Pressure Vessel 
Code 

TUCKGft.H D Duie Potuer Co 82/10/04 DENTON, H It Office of 
Uuiclea-r Reactor Regulation, Director STOLZ.JF Operating Reactors 
Branch 4 2Opp 15676 213 24X riche 50-269. 92/IO/Ofl, 9310130290 

B20B190233 IE Info Notice BO-3S, Buppl I, "Leaking & Dislodged 1-18!) 
Implant Seeds " Svc list encl 

COBD.L I Division of Fuel Facilities, Materials fc Safeguards 
92/10/06 Consolidated Edison Co of New Yard 66pp 19761 230 

2AH Fiche 50-000- 62/10/06, 8208190233 

8SlO220a26 Forwards Revision 5 to response to IE Bulletin 79-03, "Pipe 

Support Bain- Plate Designs Using Concrete Eipansion Anchor 
Bolts " 

KICKER, H B Duke Pouer Co HS/10/OB O'REILLY.J P Region 2. 

Office o* Director 24pp 1577B 273 24X Fiche 30-269,82/10/08, 
33 102 20426 

620Bi90a3H IE Bulletin 62-03, "Stress Coirosion Cracking in Thich- 
l^all. Large-Diameter. Stainless Steel, fiec irculation Sy 
Piping at DWR Plants " Svc list end 

DEYDUNfi,fl C Director's Office, Office of Inspection antf 
Enforcement 82/10/11 Consolidated EdUon Co of Neui York. 

ll$t? IBfllO 125 24X Fiche 50-000.92/10/14,8208190238 



S Reportflhle occurrences, LERs t related correspondence 

B21O190653 PNQ- II-B3-1 1 1 on 931014, Unit 3 shut down after determining 
that preisuriier code safety vatv design flow could not be 
fully maintained if called upon Seven-day outage required 
to change valves Exemption requested for Unit 1 

IONATONISM , DANCE.H C Region 2. Office of Director 82/1O/14 
2pp 15740036 24X Fiche 50-269,33/10/14,6210190633 

B21O190&95 00 on 821014. Unit S core relief valves declared inoperable 
du* to analysis prompted by EMJ safety concern Unit 3 valves 
mere offsite undergoing ring adjustment Immediate ahutdoiun 
of Untt 3 commenced 

* Duke Poiuer Co 32/10/14 Region 3. Office nf Director lp 

1S736 200 34X Fiche 50-270,82/10/14,82101906^5 

B31O290083 Forwards LER B3-013/03L-0 Detailed Event analysis encl 
TUCKER. H B Duke Pouer Co 62/10/15 0'F!EILLV,J P Region 2, 
Office of Director Hpp 15B54 Ofl7 24X Fiche 30-270,62/10/15, 
8210390083 

8210290087 LER 83-01 2/03L-0 on 020916, turb 1 ne driven emer jenc y 
feoduater pump declared inoperable when trip/ thrntt le valve 
2K5-74 diicovered tripped In closed position Cause not 
known Valve remt Video alarm uill be repaired 
PETTY, J C Duke Power Co 92/10/15 Region 2, Office of 

Director lp 15854 049 24X Fiche 50-270,02/10/15,9210390083 



DOCKET 50-371 VERMONT YANKEE NUCLEAR POUER STATION 

F Security' medical, emergency b fire protection plans 

B21O120346 Informs that Revision 6 to physical security plan 
acceptable Encl to B3072O 1 tr transmitting revision withheld 
(raf 10CFR73 21) 
VASSALLQ, D D Operating Reactors Branch 2 B3/09/22 SINCLAIR. J D 

Vermont Yankee Nuclear Power Corp 2pp 15671 101 24X 
Fiche 50-371, 82/09/22,9210130346 

0210310331 Forwards IE Safeguards Imp Rept 50-371/82-15 on B2072B-30 
Mo noncomplianc* noted 
MARTIN. T T Division of Engineering & Technical Programs 83/10/04 

SINCLAIR. J D, Vermont Yankee Nuclear Potner Corp 2pp 15766 331 
34X Fiche 50-271,82/10/04,0210210331 

B310aiO23B IE Safeguards (nsp Rept 50-371/82-15 on 820738-30 No 
nnncomp t lance noted Major areas Inspected facility 
organ! latlon, measurement & controls, shlpp Ing E> receiving 
storage & internal control & physical inventory 

DELLA RftTTA.A , WOLTNER.E F . OODY, A T Division of Ennineerinn 6 
Technical Proorams B2/09/30 7pp 15766 333 SAX 
Ficha 50-271, 83/1O/04, B31O210221 

&21Q2704S6 Releases public version of revised emergency plan 

FELTON. J M Diviilon of Rules and fleeords 63/10/08 Document 

Management Branch lp ISB33 OS4 SIX Fiche 50-271, 82/1O/OB, 
B21027043A 



3210270430 Forward! public version of Revision 4 to emerg* 
MARKTiD, I Vermont Vankee Nuclear Pouer Corp-, MARKT, D 
Atomic 1 oc trie Co 02/09/30. Office of Nuclear Reac 

Regulation. Director 3pp 15B33 OSS 24X Fiche 50-37 
S21 0270426 



8310370432 Public version of Revision 4 to emergency plan 
MUflPHV.U P Vermont Yanfcae Nuclear Pouer Corp 82/09/2B 
15933 097 24X Ficha 30-271, 93/10/08, 8210270426 



9210180190 Foruards adifl info requested In 920812 telcon re pi 
alternate shutdown sys Encl info addresses separate routing 
of cables for valves FCV 3-17 it FCV 2-1S (c RHR waives 
V10-I7 & V10-1B 

MARSOLAI8. L D Vermont Yankee Nuclear Power Corp aa/IO/li 
v~A59ALUO,I> B Operating Reactor* Branch 3 Spa 15719 IK 
Fiche 30-271,88/10/13.8210180190 



R Periodic operating reports & related correspondence 

83101905*15 Forwards monthly operating repts for Bept 1982 

TUCKER, H B Duke Power Co 83/10/15 Director's Office, Offict 

of Inspection and Enforcement lp 15751 343 H4X 
Fichu 50-269,82/10/13,8210190544 

B2IOI90552 Monthly operating rapt* for Sept 1962 

REAVIS r J A Duke Power Co 82/10/15 16pp 15751 344 24 X 
Fiche 50-269, 82/10/15, 8310190544 



B2102S0411 Ack receipt op 830708 Itr Informing NFIC of stps 
correct violations noted in IE In*p Rept 30-271 /B2-05, 
ALLAN, J.M Region t, Office of Director 82/10/12 
Vermont Yankee Nuclear Pouiei* Corp lp, 13760 26 Z4X 
Fiche 90-271, 02/10/12,8210320411 



8210220410 Responds to NRC B20722 Itr re violation* noted ir 
Bept 50-271/B2-05 Corrective action* *tudy' performed to 
determine hoiu Intsnt of augmentftion goals of NUREO-0654 
could be achieved after declaration of emergency. 
MORPHY.H P Vermont Yankee Nuclear Poiuer Corp. 82/09/00 
SMITH. If Division of Emergency Preparednis* b Operatic: 
Support. 29pp 157BO 32? 24 X Fiche 90-271,82/10/13,821 



72 



DOCKETED ITEMS 



2102BO13.4 Reloaies public version of emergency flan Itrs of agreement 
FELTOH, J M Division Of Rulus and FUcords Q2/1Q/12 Dacuiuent 

Management Branch lp 15962 346 Z1X Fichu 50-271.02/10/12. 
0210530136 

0210260135 Foruiaria public version of errata to Change <V to em&rgencij 
plan App E, com tiling of Itrs. of agreement between 31e*ne 
& States of VT,MA t NH, NCAA. US Air Force Si various local 
dospi !i businesses Receipt Form end 

I1ARKT.D Vermont Yankee -Nuclear Power Carp rtARKT. D Yankee 
Atomic Electric Co 83/10/03 Office of Nuclear Reactor 

fiegulatior,, Director lp 15043 24? 24X Fiche 50-2 



B21Q28Q14-3 Putllq veiaion op errata to Change 4 to emergency plan App 
E, consisting at 1 trs of agreement betuaen licensee t< States 
of VT.Mft (* NH, fJOAft. US Air Force t. various local liosps U 
businesses 

a Vormont Yantme Nuclear Power Corp 1 Yankee Atomit Electric 
Co 92/10/05 Plnp 15B62 230 2anriclie 50-371 . B2/ 10/13. 



Q Inspection reports. IE Bulletins t- c orresp ondenct 



B2lQ05Q'l<ia Forwards request for add! info based an revie 
IHO responses to IE Pullet in BO- 11 re masonry wall de 
VASSAL L 0, D D Operating Reactors Branch 2 S3/OG/30 

Vermont YanSee Nuclear Power Corp Spp 15612 357 
Ftch 50-271,92/06/30,0210050148 



at SOOIOt I 
ign 

StNCLfilFtiJ 



B2l007037i Foruards IE Imp Rept 50-?71/H2-li on 820B02-3O Ho 
none omn 1 1 anc e noted 

STARDBTECKt, R Division Of Proje^ 6 Resident Programs 02/09/31 
SINCLAIR. J Q Vermont Yankee Nuclear Power Corp Spa 1'Sft'jn 3.1(1 
2-U Ficne SO-S71pB2/09/34,H21oa70376 

B2IQ07G373 IE Insp (lept 50-271/82-lfc on B20B02-30 No noncump 1 i ancr 
noted Major arsai inspects!) previous insp find inos, plant 
operations, physical security, operational cur veil I mice, 
nvairit activities ', saFeguard sos operabilit^ 

RAYMOND, W J , OALLO, R M Division of Project t, Reliant ^ s , r ^<. 
0^/09/22 I6pp 13^34 001 24X Fiche 30-P/l, H2/09/24, 031, 0070^6 



P OpeTating license stage 



correspondnnc e 



92IOE101B5 Forwards safotij evaluation of methods met For anal-jut of 
phij)lc= t thDrmnl-'Aijdraiil 1 c psrf ormante 
VASffALLO, D B Operating Reacfcon Branch 3 B2/O9/15 SINCLAIR,,! D 

Vermont VanSee Nuctflar Power Corp 2fp 1577fl 370 3flX 
Flclia 50-271. S2/O9/ 15. B31 0310165 



eaiOOlQIGd Advises that all future cm respond ente from lloninti I uil] 
be addressed Eo UP Murphy Change will assui e Hirect 
communication to senior licensee mg t i-a NF1C insp findings, 
enf arc ement actions or requests 

HAVNES, R C Region I, Office of Director 02/09/27 
Vermont Yankee Nuclear Power Corp 3pp ] I5b7 PJ7 
Ftche 30-S/l, 03/09/37. B21CO10136 



MUFIPHV.U V 



E331OaiO200 Safety evaluation Bup porting reload analytic methods based 
am reviBU o f technical repts tubmitted hij uttl PC analgBii 
of physics ti thormal-^iudi-aul i c performance 
BROOKS, W . HBlliY . HOQHeV. V Office of Nuclear Reactor 
Reoulation. Director B2/09/1S 27pp- 19774 372 34X 
Ficfte 50-271, 02/09/15, 02J021OIB3 

3210210101 Forward* Amend 73 to License DPR-aa, lafetu aval uation I, 
notice of iSBuanca 6 availability rtmend Incorporato* rovlled 
cor tlierwal IITJ d" rau 1 1 c Uniting conditioria of operation 
during Fuel Cycle 9 

RODflEY.V L Dperntlng Reactors Dranch 2, B2/09/16 SINCLAlfiiJ 
Vat monfc Yankee Nuclear Powev Corp Bnp 1377^ 301 24X 
fitlia SO-37I, ESfQI/ta, 931Q2KHOI 



B210210112 Amend 7ff to Litensa DPrt-?Q, chano Ins Tach Specs to 
Incorporate revised cora thermal hydraulic limiting 
conditions during Funl CucU 9 

VASSALLO.il apec-atinj Reaetors Branch 2 aa/OW16 "PP 
15774 003 34X Ffcht 50-27! . BS/09/ta. 



8310210121 Safety evaluation supporting Amend 72 to Uiceni DfK-SS 
" Office of NucUar Reactor noguUtion, Dlrecfcor B2/09/ti 4pp 
13771 307 34X Fiche 50-271,03/0^/16,0310310101 



62I021OI37 Naties of usuance 6 
RPH-SB 

VASSALLOi D B Operating Reactors Branch S 02/09/16 
13774 311 E4X Fi the- 80-871- 82/07/16,9210210101 



labtlitij af Amend 72 to Llrtnts 
2PP 



Foruijrdi IE Insp Rept 50- 271 /fl?-i 4 an Ra07Q(,-30 t noitct 
of violation 

aTARQSTECKI.R Division of Project fc Resident Proprams CJ/O9/?J 
BINCUAIBiJ Q Vermont Yantee Nuclear Pouer Corp 2pn 15701 JH 
21X Fiche 50-271 , BS/09/27, H3IOI 50346 



fiotite nf violntion from insp on B20706 30 
Division of Project t Resident I'rograms QS/09/P7 
19704 336 24X Firhs 30-P71. 02/09/57. B21 01 503th 



~eaiO!50274 IE Insp Ropt 50-271/B2-14 on B207Q6-30 None umpllirti: 
noted Paj lore to post hot jpot rfldlation area per plant 
Administrative Procedure 0503 tt Teth Specs 

HAVWQHD.H J . CDLLIN3,B J , GrtLUl. R M Division of Project & 
RniHent Programs 02/07/31 20pp 13704 337 24X 
Fiche, 50-271,02/09/27, 9210190246 

S210Q40H3 Cc-miients on systematic assessment of licunsee perfcrnjr.tj 
rspt, ilUcutsviI *t BS010B meetinj Hept fair appraisal of 
activities for rept period 

MURPHVi H P Vermont Yankee Nuclear Poiuor Corp E12/OW20 
STrtnOSTe<:Kr, R Division of Projoct (. Hoidenl pi ogramt nB 

15SH1 144 S4X F(c^a 50-2?!, S2/09/ES, 



B21O21OBS1 Foruardi IE Safeguard* Insp Rept 50-371/np-ls nn 
No nonKonpl lance noteU 
MAR.T1N, T T Division of Engineering t. Technical I'roarani 

SINCLAIR, J B Vermont Vdutoe Wuclsar Pouier Corp PDD 
24X Ficha SO-H71. 62/10/04,8210210331 ~ YV 



8210080113 Coramsnt* on sgitemaSlt a^tatiroent of Hcsniee pBrforJ 
rept.dUcuBmil t 820906 seating Hppt fair appraisal of 
activitts far rapt perlad 

HURPHYi W P Vermont Yankee Nutltar Pcuar Corp H3/O9/as 
STAROarecm.n Division of Project & t1. taunt "rograroi 3np 
13SB1 Ifll. 2ax Ftche 30-371, BZfQI/SB* 62100-101 13 



8210210239 IE Safeguards Insp Rept 00-871/68-13 on HP072(1-,K> 
nancompllanm noted Major areas inspected facility 
organiladon.fflBasurBinen t t, controls, shl pp Ing It receiving 
Itorage 6 internal control 6. physical invuntoru 
DELLA RATTA.A , HOUTOER , E F , GODY. A T Division a p b n gi,,* 
Jsctinlcal Prooram* 82/09/30 7ff O766 333 aiX 
Fichn, 50-37 1,82/10/04,8310210221 



8210120343 R.quiU listing of submittalt re interview UUn D proovam 
ulthln 3O tfav* 
Yl\SBAU-0,l> Q Operating Reactors n ranch 3, aa/0?/S fSIWCLAIR.J !J 

Vermont Yankee Nueir Power Copp 2np 15i9J 03? 24y 
Flch 50-271, aa/C^/SB. 0310120343 



0209110333 IE Info Notlc* ESO-3S, Suppl 1, "Leaking (. Dlli 
Implant Sf*di " 9vc list end 

CDBB-.L 1 Division of Tuel Pacilitles, Materials I, Bad 
02/10x06 Consolidated Edison Co of New York &6op 

24X Flch 30-OOOiBa/10/Oi, BEOB190233, 



15741 



B3KHSOt47 Informs that revision to administrative ssetlon of Inch 
Soc re shift mannlnj r*qu Irnmints ti workinj hour 
nuidelln** rot appropriate BultatU controU alreadu ImpoinS 
( mill be subj to Insp * tnf arc mint by ftenlon J 
MURPHY.W P Vermont Yank** Nucl*r Pouir CDPB 
EIBENHUT, DO Division of LieinUno lp, 13709023 
Flthe 00-871, B=/10/13,saiOlS0147 iva via 



821013080? EN-aa-033 on or about 921013, notice of vtoUtlan t, <nc,\i, 
civil prnaltif uiiU n> iued Action based on violation r 
failure of station prtonnel to promntlo rocogntie ch*nai 
In itji of tafitu-relattxf .qulpmtnt * 

CKAIO.J , AXEUIAtW H.flion 1, Office of Director 
13703 241 24X FUh 30-371,82/10/12,8210130867 



.S* m "BMie-t.1 Hqdrao.n Pen.tr-tion. 

V.nL DP"'**'"! HDr Branch 3 62/10/14 BIHCLAIR.J D 
VBPmont Yanfci* Nuel*r Pounr Corp 1 15B34 3S9 Sx 
Fih.50-B71. 93/10/11, 



Ack receipt of aao-JOB Hr informinfl NflC of ttins tnim i 

eopj-ec* viaUtlons noted in IE Insp Rept 50-271/02-03 

ALLAH, J M R.gton I, Office of Director 82/10/1K MUHPWV U f 

Vermont Yankee Nuclear Pouor Corp U 187BO 33B 2iv 

Fieh. 50-271, B2/10/12.flZloaa041l o o -rfM x 



DOCKETED ITEMS 



73 



-9310230418 Responds *o NRC. B2O722 Itr re violations noted in IE Insj 
Rtp'. 30-271 /Q2-05 Corrective actions study performed tp 
determine ncu intent of augmentation goals of NUREG-0654 
could be achieved after declaration of emergency 
MURPHV.W P Vermont Vaniee Nuclear Pouer Cnrp Ba/09/09 
SMITH. C H Division or Emergency Preparedness ', Operational 
Support 21pt 157BO 229 24X Fiche 50-371, 83/10/12, 031022041 1 



B2100&0433 Eiemption from requirement! of Section IV F 1 nf App E ta 
1QCFR50. to allow next full-scale emergency preparedness 
eiercise at facility to be conducted on or about 320929 
Eva 1 nation enc 1 

EIGENHUT, D Division of Licensing 02/09/33 Public Service 

Electric tr Qas Co of Neu Jersey 3pp 13636 230 24-X 
Flche 50-273.03/09/23.8210060131 



2031902.30 IE Bulletin 02-O.J. "Stress Corrosion Cracking in Thick- 
Mall . Large-Di ameter. Sta in I ess Stool, fiocircu lation Sys 
Piping at BWH Plants " Gvc list end 

DEYOUNC.W C Director i Office. Office of Inspection and 
Ent'arcenent B3/IO/14 Consolidated Edison Co of New Vor V 

Il5pp 15310 125 34X Fiche 50-000.82/10/14,8208190238 



ft Periodn 



rre spondcnc 



EJ7IOI3O1.B9 Forwards monthly operating repl fpr Sept 19B5 

HLOTPHV. W P Vermont Yankee Nuclear Power Corp 82/1O/00 

Wanagmnetit Information Branch lp 15674 107 24X 
Ficfie 5O-271, 03/10/00, B31013O1B9 



P Oper-ating license stage documents d correspondence 



8210050-405 Forwards documentation of satisfactory completion nf 
requirement! contained in 790921 1 tr re TMI Action Item 
II E 1 1 concerning auxiliary feeduater sys 

VARCA.S A Operating Reactors Branch 1 03/09/20 UDER1TZ.H A 
Public Service Electric Si Qas Co of New Jersey 3pp 1 5626 377 
34X Fiche 50-372.82/09/30,8210050495 

8210050490 "Suppl to Safety Evaluation Kept for Salem Units 1 t. S 
Imp lementat ion of Recommendations for Auiiliary Feediuater 
Sys " 

o Office of Nuclear Reactor Regulation, Director 82/09/20 3pp 
15621, 230 SIX Flche 50-272, 02/07/20, S2 10050405 



S2IO139193 Monthly operating rept for Bept 1902 



Vermont Vantee Nucle 



er Corp 



App 



15674 1OB 34X Fiche 50-271,02/10/08,6310130189 



5 Reparlable occurre 



lated cof respondent 



6210130603 Advi ses that installed monitoring sys required by TMI Action 
Items II F 1 4, II F 1 St. II F I (.acceptable t, items 
considered closed 

VAHQA.S A Operating Reactors Branch 1 02/09/30 UDEHITZ.R A 
Public Service Electric i Oas Co of Neui Jersey 2pp 15692 349 
24X Fiche 30-272.82/09/30,8210130403 



&31O19OQ22 Forwards LER B2-I120/O3L-0 

PELLETIEK, J P Vermnnt Yankee Nuclear Poiuer Corp 02/10/05 
HAVNES. R C Region 1, Office of Director lp 15742 139 ^4X 
Ficho SO- 271. 03/10/05,0310190022 

--621O19OO2 1 ? LER 02-02O/03L-0 on 020902. indication on RHR 89D blinked on 
' f aft at 3.700 gpm floiu rate Indication lost uhen valve 
shut Caused by loose wiring on valve limit SLJI tch resulting 
in los* of position indication Connection tightened 
PELLETlERrJ P Vermont Yankee Nuclear Power Corp 02/10/05 
Region 1. Office of Director 3pp 15742 140 34X 
Fiche aO-27 I. 02/10/OS, 021O19O022 



orwards LEU 83-021/03L-0 
PELLET1ER.J P Vermont Yankee Nuclear Pouer Corp 02/10/12 
HAVNES.R C Region 1. Office of Director lp 15766 343 34X 
Ficne 50-271, 83/10/12. 8210210304 

-621O210214 LER 82-021/03L-O on 020914, while performing pump opnrahilllg 
surveillance on RC1C sys.RCIC tuibine tripped on overspeed 
Caused by failure of electric governor module Module 
replaced Bad transistor found in tach generator 
PELLETIER, J P Vermont Yankee Nucleai Pouier Corp 02/10/12 
Region I. Office of Director lp 15766 314 34* 
FichB 30-a? 1,03/10/12, 02102I03Q4 



DOCKET 50-272 QAt-EM NUCLEAR GENERATING STATION, UNIT 1 
f Securityp medical, emergency i fire protection plans 

6.21Q35O245 Foruiards 1902KEHA/NRC observed eierclBe scenario for B21013 
eiercise Revisions reflect changes agreed upon during B20430 
meeting w/NRC t FEMA 

ZUPKd, J M Public Service Electric & Oas Co of New Jersey 
S3/Q9/16 HAYNE9.R C Region 1, Office of Director IflBpp 
157E? OO2 24X Flche 50-272. 03/09/16, B2IO250245 

S3 1 036QS 1 a Foruarils eienption from requirements of 10CFR50 40 re Fire 
protection of safe shutdown capability 

VAROA. B A Operating Reactors Branch I B3/09/16 UDERlTZ, R A 
Public Service Electric t Gas Co of Neui Jersey 3pp 13330 160 
24X Fiche 50-272,82/09/16,0210360510 



5310190047 Informs that util rod e> change methodologv not approveil 
because of ca Iculalional content of reactivity measurement 
Neui submitt*! or return to ooron dilution method requested 
VAftGA.B A Operating Reactors Branch 1 82/09/29 UDERITZ.R A 
Public Service Electric & Oas Co of NBU Jersey 3pp 15761 041 
24X FichB 50-272.03/09/29,8210190047 

S310190507 Application for amend to Licenses DPR-70 t. DPH-79, revising 
core 1 imits, f rac ti ona 1 thermal pouier factor limit, 
performance of RCS mater inventory balance & boron 
concentration b contained vol limits 

LtDENiE A Public Service Electric fr Oas Co of Neui Jersey 
82/10/05 VARCAi B A Operating Reactor! Branch 1 2pp 15063 134 
34X Fiche 50-272, 82/10/05, B21 01 90507 

0310190515 Proposed Tech Specs supporting application to Amend Licensen 
DPR-70 t- DPR-75, revis ing core 1 Imits, frac tional pouer 
factor 1 imi t, performance of RCS uater inventory balance b 
boron concentration ' contained vol limits 

Public Service Electric t< Oai Co of Neu Jersey B2/10/05 
I7pp 15863 126 24X Fiche SO-27B, B3/IO/05. S210190507 

8310370136 Licensa Change Requests 82-17-30-31 b S3 to Licenses DPR-70 
'/ DPR- 73 Changes involve inservlce insp of snubbers, steam 
generator insp ports, containmen t ventilation valve insp b 
surveillance functional testing 

LINDEN, E A Public Service Electric & flag Co of Neu Jersey 
B3/10/07 VAROA, S A Operating Realtors Branch I 3pp 15837 036 
24X FichB SO-27H, B3/10-/07, 8210270136 

8210270113 Proposed Tech Spec changes re inservice insp of snubbers, 
installation of iteam generator insp port ii pressure drop 
test 81 reactor trip instrumentation 

Public Service Electric tt Oas Co of Neui Jersey 82/10/07 
8pp 15027 029 24X Fiche 50-272, B3/10/07. 8210270136 

9310180009 Advises that design changes satisfying concerns iprss(l in 
020917 request for addl Info r reactor protection sy/ESF 
actuation lys initiated Tech Specs uill be modified to 
address setpoint changes 

L1DEN, E A Public Service Else trie 1 Qas Co of Meui Jersey, 
BX/ 10/08, yAROA. S A Operating Reactors Branch 1 lp 19720 024 
24X Flche SO-272, B2/IO/OS, 8210180009 



Exemption from requirements of 10CFHSO 4B re fire protection 
of safa ahu tdouin capability 

EIEEHHUT, D Division of Licensing 02/09/16 Public Service 

Elnctric (. Oas Co of Neu Jersey 4pp 15830 171 24X 
Flche- &0-372,S2/09/!6,82!Q360518 

831024052^ Safety evaluation supporting liceniee request for eiemption 
from -requlremBnts of 10CFR50 40 re fire protection of safe 
shutdown capability 

t Office of Nuclear Reactor Regulation Director 82/09/16 3pp 
IS33O 175 34X Fiche 50-273. S3/09/16, B3 1026051S 

B210Q&O431 Foruards eremption from requirements of Section IV F 1 of 
App E to IOCFR50. to allow nBft full-scale emergency 
preparedness eiercise at facility to be conducted on or 
about B20729j granting 020709 request 

VAHOA. 3 A Operating Reactors Branch 1 S2/09/33 UDERlTZi R A 
Public Service Electric & Oas Co of Neui Jersey 3pp 15636 237 
2-U Fich- 80-272, 02/09/23. 821 00^0431 



0310020375 Informs that revleui & plant re Cycle 5 reload care is 
expected to achieve burnup of 11500 HUD/MTU Startup physics 
testing uill include control rod drive tests b droptlmi (c 
critical boron concentration measuremantf 

LIDEN, E A 'Public Service Electric t< &as Co of Neu Jer*ey 
83/10/14 VAROA, S OperatJno Reactors Branch 1 4pp, 15770 191 
24X Flche 50-272, BE/1Q/14, HE10E30275 

0210270352 Forward! Amends 48 t, 13 to Llonces. DPR-70 ti DPR-79, 
rtiptc t ively, afty evaluation & notice of issuance & 
availability Amend; revises process b effluent monitor* to 
agree uf/ei lit ing plant conditions 

R099, W J Operating Retctors Branch 1 83/10/10 UDERITZ.R A 
Public Service Electric lc Oas Co of Neu Jirtey 2pp 19S34 31B- 
24X Flcha S0-272i 83/10/ IB, 0210270332 



74 



DOCKETED ITEMS 



13 -to l_icenss DPR-70 It DPR-7S, respict ivt 1 u> 
ffltient monitors to agree w/eilstlng 



-S2I027Q355 Amends 
reviling process 
plant eondi 1 1 ons 
VAFICA.S/i Operating Reactori Branch 1 B2/1O/IB 
I5S34 320 24* Flch( SO-272. H2/10/ IB, B210270332 



14pp 



3210210464 Forwards IE Insp Rupts 90-272/83-25 t, 50-31 1/82-24 4? 
820901-37 & notice of violation 

ETASQSTECKJ.R Division of Project b Resident Progr*ni OSfK 
UDEHITZpR A Public Service Electric t> Oat Co of Him Jinif 
19763 DIB 24* Fiche 50-272, 02/10/06, Q3102IO-ti,4 



9310370360 Safety evaluation supporting Amends 49 & 13 to Licenses 
DPR-70 it CPF-73, respectively, 

* Office of Nuclear Reactor Regulation. Dir*cfcor 92/10/19 ipp 
15034 331 24X Fic/ie 50-272. B2/10/1B. &21027035S 

--B31027O36i Nolle! of issuance fr availability of Amend* 49 t, 13 to 
License* DPR-70 (. DPR-75, resp ti v Ig 

VAR8A.S A Dp a rat ins Reactors Branch 1. B3/IO/1B Sff 
15934 340 24 X Fichs 50-272, B3/10/IS. B21 0270332 



Inipection reporti, EE Bulletins i c orreip andenc e 



3210080015 Addl response to FQIA request for 19 categories of info re 
nuclear reactor events & lafetg problem* Foruarill document' 
lilted in App A Dotumsnts in App B complete lij withheld (rr-f 
FQJA fiamption 5J 

FELTOH, J M Division of Ruin and fit Cords B2/Q7/1K UDELL. R A 
Critical Mass Energy Pr-ajsct 9pp tStAS 027 34X 
Fiche 50-000.93/07/13,9210060013 

--B2100BO159 Systematic aisessmint of licensee performance nates re 
facility evaluation for Sept 1979-Aug 19QO 
< riRC - Ma Detailed Affiliation Olven BO/09/31 Bpp 
156B &43 24X Fiche 30-000, B2/O7/I2, BSIOOBQOig 



map on 320901-27 
82/10/O4 Ip 15763 



821O2S0469 Wotice of violation Iron 
* Region li Office of Director 
Fiche 30-272. B2/10/06. S9103104&4 



6210210477 IE I n sp Repts 50-372/B3-25 t. 30-31 1 /B3-24 

Noncomp 1 i*nc noted trip breakers closed Vila two operable 

IDUrce rang* instruments in ivc * Failure to submit 30-di^ 

LER 

NCRftHOLH.L J , SUMMERS, R , TRIPP.l E Division of Project * 

resident Programs S2/1O/04 I5pp 15763 021 24 X 

Fithe 90-272, BS/lO/Ofip B3103I04i4 



321 0270 13i> License Change Requests B2-17-EO~ai & 32 to Lice 
k DPR-73 Chang*i involve intervice insp of snubfi ei-s. ittaiT 
generator insp portsr conia inment ventilation valve insp 
furve 1 1 1 anc e funi-tional testins 

LltVDEr^E A Public Service Electric & Gai Co of Nrw Jir 
B2/IO/O7 VAROA. S A Operating Reactors Branch I 3pP 
24X Fiche 50-273.63/10/07,8210370136 



92I027OI42 Proposed Tech Spec changes re in service insp of 
installation of iteam senorator insp port s. pros sure drop 
teit >i reactor trip instrumentation 

' Public Service Electric & Gal Co of Ntai Jeriiv 
Bpp 15BS7 039 24X Ficho SO-272. 82/10/07. aS10370l3f> 



821OD70007 Reipondi. to FOIA request For ei-ght tategorisi of records 
itean genaratoTS (. it earn burbinx App A doEUments provided 
in R Udell FOIrt Request 01-313 Foruiardi dotuments lilted iti 

tiff 

FELTOH. J H Division of Rutei and Hecords H3/OB/IO LONO, D J 
Uinthrop, Stimion, Putnam li Roberts 9pp 15i45 Q63 24X 
Flchs SO-000, aa/Oa/IO. 021 0070007 



a20B19023B IE Bulletin 92-03, "Stress Corrosion CratHnj in IhuH 
Wfl 1 1 1 Lflrgi-Dtamiteri 9ta inlesi Steel'ftecirculAtion Si;i 
Piping at BWR Plants " Svc list end 

DEYOUNO.R C Director's Officr, Office of Inspection and 
Eeif arcement 63/10/14 Consolidated Edison Co of Neu Varfc 

IIBjip 15B10 123 24X Fich* 50-000. S3/IO/ 14, QSQB1W23B 



S310070E3? Porwardi tabulated data on it Bam generator Imp ti maint at 
facilities Da til should be provided to licensees 
JfpULITO.T Ppsratlng Reactors Asiessment Branch GS/04/01 
VARflA, S Operating Reactors Branch 1, 5pa 13649 131 24X 
Fiche 50-000, S2/OB/10, B210O70007 



B21O28G22I EN- B 2- 03 4 on 021027, notice of violation t propaxd 
impoiitinn at civil penalty in amount of *10, OOO issued re 
inadequate vital physical area barrier 

nrjSAKCMl , AXELRAD.J Director's Office, Office of Inipitlun 
Enforcement &2/10/33 Ip 1 5B37 OB9 34X Fiche 50- 372. 621 [ -l 
821O2B-C-221 



92L012032S Raspondt to violation! noted in IE Insp Repti 30-273/82-17 
& SO-3M/B2-I7 on 820707-OB03 Corrottlve attioni 
admin Is trativt nroceilure will b* reviled IP future 
temporary design changes art removed on fcifflelg basis 
UDERITZ.R A Public Sirvjce Electrit tc Qt Co of Hew Jersey 
92/09/aa HAYN3,R C Heoion 1> Office of Director STABaBTECnl . 

Division of Project !c Resident Program Spp 1SA5S 123. 34 X 
Flche 50-^72, e2/0?/aB,B2lOI2033B 



operating reports t< related correspondence 



B31O2000B5 Forward) monthly operating rept for Sept 11B3 

KIDURA.If J Public Service Electric % Oas Co of Meu Jtrti'f 
62/1O/IO Director's Office, Office of Inipectlon and Efil 

Ip 13757 201 24K Fiche 80-372.02/10/10,3310200083 



8210310146 Fcriuardi 1C Insp Rpt 50-372/62-33 on B20B31 ! 0901-03 Mo 
noncoinpl i*nca no-ted 

(IflaTIN.T r Diviiion it Engineering fc Technical Programs, 92/10/09 
UDERITZ.R A Public Service Electric A Dai Co of Nsu Jtrtty 2po 
15766 0<?2 Z4X Flcne 30-272, B2/lft/O5. 62I021O146 



8210200090 Monthly operating rept for Sop I 1982 

HfLLERrL K Public 9ervic* Electric t- Oa s Co of New Jinty 
92/10/10 14pp 15787 203 24X Fiche 50-272, 03f-IO/lQ. KltS 



S Reportable occurrencesi LEftt t> related cor respondtnca 



6210310162 IE Imp flept SO-273/B3-23 on 830B35 t, 09OI-O3 Ho 
noneomp I i nce noted Major areas inspected instrvlce tilting 
lurvell lance program for pumps & valvts & containment 
penetration leakage testing surveillance 

REKlTdfW A , BETTEHHAUSEN, L Civilian of Engineering ! Technical 
Programs aa/07/29 5pp 1S74A 091 aK Fiehr 30-272,83/10/05, 
6210210144 



8-21012:034*' Discusses cansisteni failure of solenoid valvei ir 
cont*inmtnt fan call unit svc uater flow control valve 
LIceniae inve itijat ion determinid that ovsrhoated valves 
cauied sticking Valves raplaceif 

CHIRAMAUH Director's Office 80/09/12 Director's Cff 

tSnb?0 I9O 24X Fiche 50-273. BQ/O9/12, 631012036? 



9208190233 IE Info Notice 80-39, Suppl 1. "Leaking h Dislodged 1-135 
Implant Sterfi " Bvc lilt end 

CDBB.t I Division of Futl F*cUitUi, Materiali & Safegirirtf) 
02/10/06 Cantollifjted Edison Co aP Neu Vork 46pp. 13741 250 

24X Fiche: 30-000* 82/10/06,97081 90333 



B21O01000B Respondi to FOIA request for 19 categories ot 
nuclear reactor event* & safety problem Forufrds gfocif 
lUtitf in App A 

FELTON. J.M Division of Rules and Records 02/06/20 
Critical Mas* Energy Project ISpp 15727 OOS 24* 
Fiche 30-000, 83/06/29, 92IOOIOOOB 



a a 102 10-135 Foruard* IE Insp Reptl 90-27S/92-B0 tc 50-311/88-20 on 
320816-20 No noneomp I Unc* noted 

MARTINET T Division of EnalneerJng 1< Technical Programs. BH/10/Oi 
UOERITZiR A Public &*rvic* Electric b Oai Co, of Ntu Jiney, Spp 
15763-036 34K Fiche &0-272.B2/IO/QA, 9210210435 

~gai02l04&l IE lnp Repts 50-273/82-20 ft 30-31 1/62-30 on SS0916-20 Mo 
noncompllance nated. Hijor areis Iniptctid: qualification & 
training, radic-lofllcal survus, rWtaUan exposure permits, 
posting, 1 Icanset audit] tc aiposure control 

HOSEy.C.M . ROWErC.A,, OHEENMAN, E, Division of Engineering t 
Technical Programs B2/09/30. Sop 19763:039, 24 K 
FIchB- SO-a7S, B2/ 10/06. 82 1021 043 S, 



320213023& Notifiei thet inadvertent; isolation of contalntent 14' 
coolers sys du* to radiation alarms is not llkelg LER re ivf 
water itolatlon valve) found closed to containment ^an coil 
units does not merit further consideration 

L ANN I MO, H Director'* Office 62/01/21, HICHGLSON,C DLl|t1?< 
Office, Spp 19732257 24X Fi che 50-000, 92/06/55, e2100l(K>M 

82100B0019 Addl response to FOIA request for 19 cteoorii at inft" 
nuclear reactor event* & safety problems Foruiirdi dacumenti 
lifted in App A Documents in App B completely withheld Cref 
FDIA Eilmption 9) 

FELTON, J H Division of Rule) and Records 92/O7/12, UDELL.lr 
Critical Mais Energy Project 9pp 136A9 027 24X 
Fiihe' 30-000, 92/O7/12,92100e0013 



0210080197 NRC operations ctr uiage chart TB events at facLllliM 
* NRC - No Dtailed Affiliation Oiven 92/07/12. Ip ISMS' 
24X FIrhe- SO-000. 93/07/12, 031009001B. 



DOCKETED ITEMS 



75 



&ZIM10ISL Foruards LER S2-067/03L-Q Detailed event analusil encl 

Puftlic Service Electric t Gas Co of Neu Jersey 
HAVNE5.R C Regicn I. Office of Director 3pp 
1554.7 3Q2 24* Fiche 50-272, 02/09/16. S21OQ 101B1 



821015O11I Foruards LER ai-OI9/03X-l Detailed event analgsis encl 
MIBURAiH J Public Service Electric It QBE Co of Neiu Jer*eg 
82/09/39 HAVNES, R C .Region I. Office of Director 3pp 
156.97 070 34X Fithe 50-272,82/07/29,8310150111 



--G21G01OI92 LER 82-069/03L-0 on B2QS31,svc water leak discovered on 
charging pump IS lube oil cooler outlet piping b pump 
declared inoperable Caused by erosion of piping bij s 1 1 1- 
laden svc uater Pipe replaced 

IfELLER, R Public Service Electric I> Oils Co of New Jerseg 
e2/Oi"/!6 Region 1. Office nf Director Ip 15367 303 24X 

Fieh* 50-272,a3/09/l6,82!OOl01Sl 



-B2KH5Q121 LER ai-019/O3X~l on BIQ22.li Fire alarm annunciation on Panel 
1R-P5 for uiaite oas corop resor observed but no aurfible alarm 
heard Cauied by failure of amplifier to discriminate igi 
nms from announcement function Amplifier adjuited 
HELLER i R Public Service Electric & Oas Co of Mui Jerseg 
S2/O9/29 Region 1. Office of Director In 15697073 24X 

Flcho 50-272.ea/Q9/29,H210100Ml 



2-100103-33 Foruards LER SI-D6B/03L-0 Detailed event analysis encl 
KIDUflA.H J Public Service Electric & Gas Co of New Jersey 
G2/O9/16 HAYfJES.fl C Region 1. Office of Director 3pp 
I559 113 24X Fiche 50-372,02/07/16,8210010383 



B2101S01E7 Forwards LER B2-067/Q3L-Q Detailed event analysis encl 
MfDl/RA.H J Public Service Electric & Qa-s Co of New Jersey 
B2/09/29 HAYNES. R C Region 1. Office of Director 3pp. 
15693 324 24X Ftche 30-372. B2/O9/29. B2I01 30137 



210010390 LEfl 62-O6B/03L-O on 920827, 100-f t elevation containment 
lock declared inoperable after eicesswe leakage discovered 

pail; inner door seals Caused by closing door y/eicesslve 
force Seal replaced Installation of snubbers proposed 

HeLLER.ff public Service Electric t- Gas Co of New Jersey 

O2/C9/16 Region 1. Office of Diiectnr Ip 19969 196 24X 

Fiche SO-2 - '2.92/O9/16,e21Q01O3B3 



821015Q140 LER a2-O67/03L-O on S2O9-13,,no indication of ivc water flow 
to containment fan coil unit El noted while coll unit 14 
Inoperable Can tad by terminal acreui cm svc water Plow 
transmitter dreading off Screw replaced 

FRAHM, R Public Service Electric & Oas Co of Nfliu Jersey 
82/09/39 Region I. Office of Director Ip 15678 337 24X 

Ficbo 30-272, B2/0<7/27, S?10I50i27 



3310070305 Faruards LER 82-073/03L-O Detailed event analysis encl 
MtDURArH J Public Service Electric f, Cas Co of New Jersey 
B2/09/22 HfiVNES.H C Region I. Office of Director 3pp 
15fr34 1O7 34X Fiche 50-272, 02/09/22, S21OO70305 



82101SQ149 Foruards LE|t 82 Q51/03X-1 Detailed evenb analvus en 
HIDUflA- H J Public Service' Electric & Oaf -a of ttnia Jpig 
62/09/29 HAVNEBi R C Region 1, Office at Director 3pp 
15697 EBB 24X Fichu 5O-272. 82/O9/29. BB1 OI 50143 



--621C-07O314 LER aa-O73/03L-O on 820906, cal nu 1 ati on showed that quadrant 
pouer tilt ratio for oottom detector N42 eiceeded mat 
allauable [jmit Caused by failed milllamp detector suitcti in 
current meter assemolg Assembly replaced fc channel tested 
FflflWM.R Public Service Electric t Gas Co of New Jerseij 
B3/O9/22 Region 1, Office of Director Ip 15634 110 24X 

FichEr 50-272.62/09/32,5210070305 



6210190155 LER B2-051/O3X-1 on B2072S. f o-l louing redctur tripi level in 
auniliary feed itovage tan' dropped b i 1 ou Tech Sp*c rain 
Caused bcj binding Of valve 1DR& Valve manually cvcled t> tank 
level re>itorac( to normal Valve returnecf to remote modi 
HELLER. R Pu&lic Service Electric & Oas Co of New Jeng 
B2/O9/27 Region 1. Office of Director Ip 13697 391 34X 

Ficha 50-273, SS/O9/27. 6210150143 



I3LOO7036B Forwards LER S2-Q74/04L-0 Detailed event analvsis encl 
MEDUflrt,!! J Public Service Electric t Gas Co of New Jersey 
B2/0-7/22 HVWNES.R C Region i. Office of Director 3pp 
13634 031 24X Fiche 50-27?. B2/09/33, 8210070368 



B21021O134 Foriuarrfs LEU B2-07Q/03U-0 Detailed event analgtis end 
M I DURA i H J Public Service Electric 4 Gas Co of Nu Jeng 
B2/10/O6 HAYNES.R C Region t. Office of Director 3pp 
15764. 120 24X FichB 90-273, B2/ 10/06. B2102 1 0134 



-B210Q7Q37S LER H2-07fl/04L-0 on 620903, ind ication of unplanned release 
t^^^JU^h plant vent received Three individuals contaminated 
during attempts to locate source Caused bg door hitting 
a j.i-1-nit drain valve 1CV332. cauEing valve to loosen & open 
HOLLER ;R Public Service Electric b Gas Co of Neu Jersey 
03/09/22 Region I. Office of Director Ip 15634 034 24X 

Fiche 50-272.83/09/22.8210070368 



--621O21Q144 LER 82-070/03L-0 on 620912 & 14, presiui-Jier pre*ura 
controller shifted to manual modte ui/d*creflainB pi'enure 
Cauie-d bg intermittent arable in pra-llure controller or 
injinw*I-aki6o station Manual-auto ttation replaced 
FRAHM, R, Public Service Electric tt Oa> Co of New Jrstg 
92/1O/06 Region li Dffit* of Director Ip, 18766 103 24X 

Flch, 30-272, B2/1O/06. B21O210I34 



2IOO70330 Furuards LER B2-071/04L-0 Detailed ovent analysis encl 
MIDURAyM J Public Service Electric i Oas Co of Neu Jersey 
S3/09/22 HAYNEB.R C Region 1, Office of Director 3pp 
15633 35fc 24* Fiche 30-272. 02/09/22- B2100703BO 



B210290216 Forwards corrected LER S2-O1 6/04L-0 Detdlled event j 
enc 1 

MIDURAj H J Public Service El tc trie k Oas Co of Neu Jersey 
B2/IO/O6 HAVNESjfl C /leoion li affice of Director. 3pp 
15953-350 24X Fiche 50-27S, 82/ 1 0/O6, BaiOa9O21t 



LER S2-071/Q4L-0 on 620827. contr ol operator discovered 
increasing level on Plant vent radioactivity monitor b 
issuerf significant event notifications far unplanned 
release-! Caused by primary coolant leakage from RGB filter 
FRAIIll, R Public Service Electric & Oas Co of Neiu Jersig 
62/09/32 Region 1. Office of Director Ip 15433 339 H4X 

Fiche 50-272,62/09/22,8210070380 



B21O29021B Corrected LEfl B2-016/04L-0 on 820336, during gaseous release 
from uaste ja> mij i, tontainiiien t/plan t vent monitors IRllAi 
1R12A li 1R12B incorrectly Aligned Cauied by operator failure 
to properly perform operating instruction, 
FRAHM,R Public Service Electric . Oa Co of Neui Jersey 
82/04/13 Region 1. Office of Director Ip, 1S853 253 S4X 

Fiehe 30-272, B2/lO/Oii 8210290216 



2IO15CQSO Foruardi LER 82-066/O3X-1 Detailed event analysis encl 
MIDI^R/l. H J Public Service Electric & Oas Co of Neiu Jerieg 
B2/O9/29 HAVNES.R C Region 1. Office of Director 3pp 
156-78 296 24X Fiche 50-272, B2/09/27, 82101 30058 

-6210150066 LER 82-066/03X-1 on 820B25, 100 ft elevation containment air 
lock outer door discovered not properly sealed Cauied bg 
seal damage due to personnel closing door u/eicess i vt force 
Seal replaced & door tested sat isfac tori 1 g 
HELLBfliR Public Service Electric k Oas Co of Neu Jerseij 
82/09/29 Region 1, Office of Director Ip 15698 299 21X 

Fiche 50-272.82/09/29,6210150058 

>1 01 50071 Farwardi LER 82-044/03*-! Detailed evvnt analysis encl 
HIDLJfTA. H J Public Service Electric & Oai Co of Neu Jersey. 
32/09/29 HANYES.R C Region 1, Office Of Director 3pp 
15701 243 24X Fiche 50-272, BK/O9/29, 82101 30071 

82IO1SOO7S LER B2-044/03X-I on 820623, dur ino routine operation, vital 
ventilation control ctr 1C tripped, render ing control room 
emergency air conditioning fan 12 inopirab le. Caused by 
setpotnt drift & breaker 1CI6Y trip Breaker replaced 
H&LLEH. F public Service Electric t Oas Co of Neu Jersey 
62/09/29 Region 1. Office of Director Ip 1S701 B4fi S4X 

FCcNe 50-272, B2/09/29, 8210150071 



82IOE9031O Foruards corrected LER B2-OSO/Q4L-0 Detalleit event analysis 
end 

MIDUHA>H J Public arvlce Electric t Oai Co at Neu Jersey 
92/1O/06 HAVNE8, R C Reflion 1. Office of Director 3pp, 
15B93'O90 24X Fiche 50-27E, 82/1O/O6, 8210390310. 

-B21O290314 Corrected LER B2-030VQ4L-0 on 820710, At 1 antic loggerhead 
tur>tl found imp ing id on circulating water itfs intatt trath 
b*r* Cauied by Inability of turtle to actively avoid 
approach velocities to intake dire to weakened state 
FRAHM^R Puolic Service Electric: i <9a CP. of Ncu Jersey, 
32/08/06 Region 1< Office of Director Ip. 13853.093, 24X 

Ficht 30-372. 82/10/06, 621Q39031Q 

0210890333 Foruiards corrected LER BS-049/Oqt-O Detailed evnt analysis 
encl 

MIDURAi H J Public Service Electric tr 0i Co of Meu Jurug, 
&B/IO/Oi, NAVNEai R C Rejion 1. Office of Director 3pp 
1SBS3 014 24X Ficfie 50-273. 82/1O/OA, aai02<?O353 

B21029Q361 LER B2-Q15/Q4L-Q on B20710ruat. monitor tank content* 
*ample diicarded before corapocite- lanples asienbled Cauied 
bg technician inadvertently pouring out sample. Personnel 
covn*ltd re pTocmJuret Simulated **mple made, 
FRAHM.R. Public Snrvlee EKctric & 9> Co. of Una Jerieg 
63/07/28 Region 1' Office of Director. Ip. 1SB53 017. B4X 

Fith* SO-27 S,BS/ 1 0/06 f 8210290333 



76 



DOCKETED ITEMS 



DOCKET 90-273 DIABtO CANYON NUCLEAR PDHER PLANT, UNIT 1 

A Apjl ieat ion/con-itruction taga document* k eornipcndince 

..__ .___,,__, ...___,.,..,__ .-_-_- -^-, ._______--,._._ __.____. __- 

82100IOQOB fleipond* to FOIA rea.ueit for 11 categoritt of document! r> 
nuclear reeetoc- evtnte & lafety problemi. Forward* documenti 
U*teif In Ayfi A 

FELTOM.J Diviiion of Rule* and Recordl SS/Ob/28 UDEUL.H A 
Critical H*ii Enrgv Project ISpp 1B727 009. 24X 
FlcAt SO-000. S2/06/28. S2I0010QOB 

BQ00Q90269 Dlicuiiei addl renulreif Inlo to bitter define potential for 
cricking in reactor vatlel noilln 

NOOTAH, V ff AnHtant Director for H*tirllt Ic Oualif icationi 
Enfinirlng BO/05/QS TGDEBCfl.R L Aiilitant Dirictor tor 
Llctniing 2pf 13727 176 B4X Fichu' 50-000, 83/OA/2B, 021 001000B 

F Security.! medlealr emarjencu. b fir* protection plans 

9210010406 Forward I applieitlon for emend to Llcanie DPR-7bi rivif ing 
Kturltg plan 

CFANE.P.A Pacific Oai (. Electric Co BB/09/17 DENTOM.H R 
Office t>1 Nuclear Reactor Regulations Director lp. 19972.207, 24X 
Fleh, 30-279., 02/09/17,521001040*. 

--B210<0104I3 Application to amend Lieenit DPR-7A, rtviil nj tteuritu plin 
B4f*]ueri(i info ftiittt. 

HAMEATJB-0 A., CRANE, P, A Pacific On b Elictrlc Co B2/07/17 
3j>p ]SH72:aOa, S4X fieh. 30-270, 82/09/17,B21001040i, 



8210030219 Riply to applicant & NRC 820924 briefs r* lUtui af pf 
apptalf froin authoriiation of loui power opr*tion Ha 
adtqiJ.lt* factual bull *il*ti to support ASLD diimiml al 
Joint Inttrvtnor OA conttntion ai moot M/Certif icatc of Bvc 
REYNOLDS, J fl Joint Intrvinopi-Diab lo Canyon REWDLDS. J R 
Cintvr For Lau in the Public Interest SS/09/3O Atonic *f 

and Llcvnilng Appfll Pand Spp 15611 337 34 X 
FUn* 50-279,62/09/30,8210030218 

9210060220 Reply brttf to other party briifi r> noDtnift ot low | 
cantentlDn-i Emgrgincij planning inuet d certain other 
ifiuei moot Cartificata of Svc end 

LOCKE, R F Pacific Oai t Electric Co 82/07/30 Atomic Si' 

and L iteming Appeal P*nel ipp 13630 170 24X 
Fieht 30-H7S, S2/09/30,B210060220 

B2100'1D097 Reply to Oovsrnor Droun t< Joint Intervenon B3Q13H til 
in niponie to A8LB B20902 order on mootnan of I am pcuier 
iiiuo Emergency planning inuei (< lome loui pouiir 
contention* mooted Certificate of Bvc encl 

JONES. B W, Hairing Dranch 1 B2/10/01 Atomic Safety *nd 

Liceniing Appeal Panel Iff 133BI 02A 24X Fich SO-SJi'Bit 
82 100 40097 

6210050190 Replij brief to util b NRC S20724 brief* r* irootnm ai 
power lnuei'pir ABLE BE0902 order IIIUBI not moat 
Controvar-ig ttlll eiiiti !< inue ii of practical 
llgnlMcance Cirtiflcate of Svc encl 

DRDWHiH H California- State of BROWN, H H Klrkpatr iet. Lttt 
Hill' Chriitophir (. Philllpi 82/10/01 Atonic Bifit^ mf 

Llcinilng Appeal Panel Bpp 19403 343 24X Fiche SQ-37S,63> 
BS100501BO 



QBI0210033 neliatei public veriloti af ravlieif effltrjeneij plin 
imp lemin ting proeid'urii, 

FtLTOH. J,M, Dlvliion ot Rurlti anil Racordi S2/10/OJ Document 

Hifllmint Dranch if. 18762; 091 S-IX Fl ch*:50-279, 02/10/01, 
0S 1021 0033, 

'0210210011 Forward* public vtnlon- of rivited emrgtncv pl*n 
inpliDiindng ppottdurtii Including Procedure Ep M-3 re 
clilorlni r*U4tiEP M-B r* Tiunini uarnlng i EP M-G rr 
conSalnmirtt tintrjencij ptrtonnel h*6eh, 

CflANB,P,^, Pael'le Oti t electric Co. B2/09/23, eHOILKEN.fl H 
nig ion B< aNict of Dlrtctar. 3pp, 19738:093, S-tX 
FUhe. 60-378, Ba/l<V01, 3310310033 



8210040196 fiiqueit for laive to ulthdraui certain exceptiani to AH 
620831 initial ifecllion rtSLD B20927 clarification of i lcal 
juriid'ict ion acquieicance to precondi t ioni re BOPi render 
Keep tlont unnecemrij Ctrtlficate of Bvc ancl 
HASSELL, D r Hearing Branch 1 82/10/04 Atomic Qttttv r.i 

Lictnilng Appeal Panel 3pp 13413 173 24 X Flcha SO-B75. B2. 
02 10040 1 E6 



9210070143 Order ettanding time until B2100B for Coirml 
reviiu ALAff-ifll 

CHILK, B, J, Office of the Scrttry of the Commiiilon 
Commlnloneri. lp 15627076 24 X FIche 30-273, SS/JO/03, 
BS10070M5, 



Public vertlcn of pevlitd initrgfncii plin Implementing 
ii, Including Procidun P H-3 r chlorine reltnii 
E? H-9 re Tiuniinl umrnlng Ii EP K-S re contilnntnt 



I, Glictrle Co. D9/09/1-3. 64pp. 197821099. S4X 



Birppl to EtS071<r ipplUjtlon far *flind ts Lie in it DPR -76 re 
4**i/l-tty plan. End witliniU (ref 10CFR73, Sit. 
CfUNI-P.A, PaciflB Oil b Ilieitic Co, 2/10/19, DEMTQN.H.R.i 
M Ifl (SOU I A OMiei of Ht/elitr Rfattcr Rigul*tleni Ofricior. Bpp. 
16X031 97V, S4X Plehe: 80-870, aa/iCVIB, BS 



eorpuperdinet 



n up on iff ta B30S1S pitltlan nqutitlng action under 
(OCfflfl. B06, For riiion* lasted In *r>eleiid Dlrietar'i 

j ebltlgn iinUd, 

rh, orfltf af Mifelur flurtor Jtigulitiani Dlpietar. 

, fllVNOi-DIr J. Cifllir far Lay in thi Pirtlic ln,tiri*t. 
ISB43i 164, B4X Plehit: SO-B79* flS/Qf/SB, 18(039044*, 



DlrietBr'i fiieiilar DD-DB-10 dmulng otp for Liu in Public 
I3091B Hatitlon Mounting MC lnui ordir (a util 
la *utffli* mind ta OL ta covir HA t 00 liiun. 

. O'flei at Nutlef flueter Rraulillam Dlrfcter. 

?ep, IBQiai E7I, 94X Flehu 90-9 



8210130272 Fo-riiiardt Bin Lull ObUpo County Doird of Suptrvitor i E 
action approving Bin Lull Obltpo County nuclear pouer plent 
nurgencv reiponit plan It State of CA Senate Dill 1473 
minding govt code. Certificate of Svc end 
CRANiP,A Pacific Oat t. Elictrlc Co. SE/10/Oi JIUCiW II - 
JDHfJBONrW, R . MOORE, T 5 Atomic Safety and Uceniin* tlfnl Pi 
ipp. 19673.284, S4X Flche 80-275-92/10/06,0210130278 



8210130332 Order CLI-B2-30 directing all natl fecurltu cUiil 
be eJtpungerf from ALAD-&93 Ii underlying record Info not 
iltintlel to ABLAB opinion b eipunctlon would not prt|u(lc+ 
my party or public 

CHILKiS.J. Office of the Secretary of the Committing 
2pp, 18492:108. 24X FUht 90-279,02/10/00,8210120332 

6210130327 Order eitendlng timi until 821026 for Commit tint to 11 
rivleu AUAB-tBl. 

CHRK, fl, J, Office of the Becretary of the Commtiiic-n, B3/IC-/I 
Comnltlioniflrfl. lp. 19678; 282, 24X Flche' 50-278,62/10/00, 
S210130327. 



8310310428 Order eitandlng tine until B21103 for Cosimllilon t* 
rivliu NflR Director 62092! denial of Joint Intirvunon 
lOOFftS. 806 requnt. 

CH1LK. B. J, Office of the Secretary of the Convnltil^n 
Cflflxmtllionirt. lp. 18743' Ofl3 2-4 X Flche: 90-279.62/14/19 
SS 102 10432. 



"8910890484 He tie* of lnuinii t DIrictor't Diclilen DD-BS-IO under 
lOSPfla.aOft dtnuing pitiltlin feu Ctr tor Liu In Public 
Inliriit cftuiil la rtquin will (a tubnlt tntni ta OL be 
eavir 8A It 40 tnuii, 

MNTeKiH.R, OMit ^ Nuiltir flueter Rigulitianf CJrteber, 
BB/09/BB. 9pp, lBSi l?fl t B4X Fichu BO-871. 18/09/881 



1210200849 Kimcrandum In reiponie to util S20924 motion far 
cUrlfltAblon of ASLB 820931 initial dtcldon, Dec Iilon 
lupporti coneluilon of Uu on adequacu of offiit* tnir|iMv 
pUnning. 

WOLF. J.F. Atomic- Bifetij and Llcenilng Board Panel B2/IO/2A 
18937^086, S4X Flchl, 80-275, B2/10/26, S2102SOS45. 



lBiaa40iee Brdir utindlng tlni until BRIMS *r 0*Uiin ** nfc to 
ftvltw AUAB-ABL 

flKJLKifl.J, Of'Ki at th* flitrttii-y of thi CiMfiilan, 
SafflfllillUniri, lp, UHlfMB. B4K FiBhll BO-B79, 88/09/30, 

aa ioo4 01 01. 



H, Sinepil eorr eipendenei 



6310020369 Advliti th*t B21010 Hr nqueitlng util r 
laftbu iV* *t planti ullt tie tint to all partlil 
OILIH8KV- V, Commlillontri, S2/iO/flO, SCHULK,B, 
Unknown. lp. 10779:201, 24 K Fieht: 80-279, 02/10/30. 8210fflJi: 



DOCKETED ITEMS 



77 



--321:0530367 Urges util be forced to recalculate entire seismic safety 
iiji at plan t 

SCHULKE.S Affiliation Unknown 
Coirms*i(meT lp 15779 302 
B210220363 



82/10/10 GILINSKY, V 
24X Fiche 50-275,82/10/20. 



8310120284 "Blume Internal Review Independent Internal Review of Work 
Dana by URS/Blume Engineers on Diablo Canyon Nuclear Power 
Plant, " final rept 

* UR8 Carp URS/JAB 02 it 33/09/30 SOpp 13654 117 24 X 
Fiche 50-275.92/10X01.0210120278 



Operating license stage tic 



jpondenci 



E21QOB0350 Informs that procedure, me lud ing proposed "Statement re 
Potential of Apparent Conflicts of Interest'" meets 
requirements for independence Requests procedure be included 
in program mg t plan; for Phase I & Phase II 

DEN TOM, H Ft Office nf Nuclear Reactor Regulation, Director 
B2/O9/OS COOPER, ME Teledyne Engineering Services ip 
6 31X Fiche 50-275,92/09/06,0210090330 



application for amend to Lien 



sec ur i tij plan 

CRANE, P A Pacific Gas t. Electric Cc 
Cffite of Nuc]c.ar Reactor Regulation, 
Fich 50-275, B2/09/17.S2IOQ10406 



92/09/17 
Director lp 



DPR-76, rev i Sinn 
DENTON. H R 



6210O10fll3 Application to amend License DPR-76, revi s ing security plan 
Safeguards info deleted 

rTArJFATIS. Q ft , CflANE. P A Pacific flas J. Electric Co B2/O7/17 
Jpp 15572 2OB 24X Fiche 50-275,92/09/17.9210010406 

S3LOO4D42V In fin-rat of decision to partially refund fees remitted u/ 
BOCS21 application to eitend latest CP completion dates 
MtLLER.IJ O License Fee Management Branch B2/09/21 FUHDUSH, M H 
Pacific Oas S- Electric Co lp 15597 262 34X 
Fiche 50-275,92/09/21,9210010429 



B210C-80373 Notifies that program procedure for communication from t> to 
Independent design verification program will be revised to 
conform w/gul del inei provided in 920927 Itr 

COOPER, W E Teledyne Enerjy System 82/10/02 DEN TON. H R Office 
of Nuclear Reactor Regulation, Director 2pp 13638 124 24X 
Fiehe 50-273, 52/10/02,8210030272 

9210090076 Forwards interim technical rept "1 ndepondent Design 
Verification Program Verification Program for PQ&E 
Corrective Action," Revision 

DENIEON.E Robert L Cl oud Assoc ia tes, Inc B2/10/05 DENTQN, H R 
Office of Nuclear Reactor Reg-ulatlqn. Director ENOELKEM, R H 
Region 9, Office of Director MANEATlSiO E Pacific Qas & Electric 
Co lp 13MO 277 H4X Fiche 50-278,92/10/05,9210000079 

B21OOB0090 "Indtpendant Deilgn Verification Program Verification 
Program for P01E Corrective Action." Revision 

DENISON.E Robert L Cloud Associates, Inc P 105-4-339-003/100 
82/10/05 ilpp 15440 278 24X Fiche 50-279. 02/10/05, 8210QBQQ7B 

8210250167 Forwards "Diablo Canyon Nuclear Power Plant Independent 
Design Verification Program Program Plan, Re vision 1, Adjunct 
Program for Evaluation of Const QA " 

COOPER, U E Teledyne Engineering Services B2/10/OS DENTQN, H R 
Office of Nuclear Reactor Regulation, Director ENQELKEN, R H 
Region 3, Office of Director MANEATIS,G A Pacific OKI t, Electric: 
Co 2pp 1S7B7 120 24X Fiche 30-275-92/10/03,9210230167 



&3l0130Q5fs Responds to 920737 request for status rept on design 
verification program & briefing on proposed Phase II of 
program Info discussing background fr current status enc 1 
DIRCKS.tl J Office of the Eiecutive Director for Operations 
B3/O9/24 PALLADINO.N J . GILINBKV-V , AHErtRNE. J F Commiss loners 
2B>p 15692 284 24X Fiche 50-275,92/09/24.8210130056 

B21QOI0I49 Provides guidance to assure independence of Telidgne 
Eno- ln*ering Svca uM I e recognliing need for communication 
betuieTi Teledi|ne & util 

DEN TON, H R Office of Nuclear Reactor Regulation, Director 
92/O972? COOPED, W E Teledijno Engineering Service* 3pp 
15S67 244 24X Fiche 50-375,62/09/29,9310010149 

G?IOOB0191 Foruards Revision 2 to Procedure DCNPP-IDVP-PP-005, 
"Potential or Apparent Conflicts of Interest of 
Individuals " Uord* "engineering mgt" inadvertently omitted 
In Sittion 2 O during retyping of Revision 1 

COOPER, H E TeledijnB Engineering Services B2/09/29 DENTON. H R 
Office of Nuclear Reactor Regulation, Dlroc tor ENCELKEN. R H 
Region -5, Office of Director MANEATIS,0 A Pacific Oas & Electric 
Co lp 1564O IBS 24X Fiche 50-275,93/09/29,9310080(91 

B2IOQB0193 Reviaion 3 to DCNPP- 1DVP-PP-005. "Potential or Apparent 
Conflicts of Interest of Individuals " 

COOPER, W E Tlerii|nB Engineering Services 02/07/39 5pp 
15610 JB3 24X Fiche 50-273,92/09/39,8210090191 



821O2S0171 "Diablo Cangon Nuclear Pouer Plant Independent Dnign 
Verification Program Program Plan. Revision 1, Adjunct Progr>am 
for Evaluation of Const Oft " 

Teledyne Engineering Services 82/10/01 12pp 15787 123 
24X Fichu 30-279,92/10/03.8210350167 

B210230UB Forwards (iH Engalken 820715 memo re RF Reerfgr Inc e>lt 
meeting concerning QA audits for consideration in eviration 
of OA program 

EI9ENHUT.D Division of Licensing 02/10/06 COOPER, U E 
Telodvne Engineering Services, 2pp 15009 007 24K 
Fiche 50-275,82/10/06.8210250169 

B21O250392 Bummarg of 020910 meeting w/util & RF Reedy, Inc rf QA audit 
of in-house deBign 

EHOELKEN, R H Region S, Office of Director B3/09/1S 
DEMTOH, H R Office of Nuclaar Reactor Hegulatlon, Director 3pp 
ISBOB'OH S4X Fiche 50-375,82/10/06,9310250168 

9310330240 Foruarde Independent design verification program comments on 
Phaio I final rept Rept should contain detailed descriptions 
of scope, criteria, methodology & modali for all structures, 
sifs b components 

COOPER, W E T*ldn Engineering 8ervUe 82/10/07 DENTDN, H R 
Office of Nuclear Reactor Regulation, Dimeter ENQELKEN- R H 
Region 9, Office of Director MANEATIB.O A, Pacific Oa k Electric 
Co 16pp 13789 150 24X Fiche 30-279, B2/10/07, 831035024C- 



Foruards info addressing Sections 3 1,2 S.Z 3 tc 2 4 of 
Generic ttr 81-O7 re NUREG-0612; "Control of Heavy Loads " 
Section ? I update! B 10921 submlttal Submit tal addressing 
remaining required analyses eipected by end of Feb 1983 
CRANE.P A Pacific Oaa 1 Electric Co 82/09/30 MIRAGLIA.F J 
Licensing Branch 3 176pp 15605 312 24X Ficha 30-375,83/09/30, 
B2IOOS0122 

621005O14-1 Responds to Oeneric Ltr B3-12 re plant staff working hours 
Util administrative procedures address revised working 
hours 

CRANE,P A Pacific Gas J, Electric Co 93/10/01 MIRAOLIA, F J 
Licenaina Branch 3 lp 15605 161 34X Fiche 30-373,92/10/01, 
0210050144 



8210030123 Notifies of B21007 meeting w/utll in Ban Franc iico,CA 
to discuss status of fhasn I & II, instrument tot rtj for 
verification of corrective action b WRC 820919 Itr r fuel 
load. 

* T*ledyne En*rgg Systems B3/10/OB Tcledyne Energy 9ystmn* 

lp 19640 137 24X FUh. 50-273, B2/ 10/08, 92100B0133 

8210290446 Staff requirements mnmo re BE 1007 af f irmation/discus non !i 
vote on Btnilon of conit completion dates for UPPB8: 
purging af claisifled mitl In ALAB-653 if vmergency 
preparednesi It risks assoclatid u/fuel loading, 

CHILK, B J Office of th Secretary af the Commlttslon, BH/IO/OH 
Office af the Secretary of the Commission 3pp. 13063, IBB, 34X 
Fiche- 30-000, 83/10/08, B3 1 0290446 



B21013027B forward* "Design Verification-Phase I," final rept t "Dluitm 
Internal flevieu <BIR) Independent Internal Reviews of Work 
Done bu, LfiS/Blum Engineers on Diablo Canyon Nuclear Power 
Plane " 

CF)ANE,P A Pacific Oas (. Electric Co 82/IO/01 EI8ENHUT, D, 
Division of Licensing 2pp 1 5653 243 4X Fiche 50-275,93/10/01, 
S71OI20273 



931OIH03B3 "Dosign Verification - Phase 1, Final Rept " 
n Pacific Oas i. Electric Co T100S743 R03 82/10/01 
13653 245 24X Fiche 30-275,83/10/01,9310120378 



233pp 



B210190470 Provide* info r oumershlp of Cechtel Power Corp 

FRIEND, H B Bichtel Corp 83/10/11 MIRAQLIA.F J Licensing 
Branch 3 lp 13740 181 24X Flch* 50-375,82/10/11,9310190470, 

9310270331 Advls** that Bechtel Pouer Carp i entity responsible for 
work on project Qiunerihip. held bg officers of Bechtel 
Oraupr Inc , 

FRIEND, H B Pacific Da* & ei.ctric Co FRIEND.H.B. Bechtel Cnrp 
92/10/11 MIRAOLIA. F. J, Licensing Branch 3 lp 1SB34'339, 34 X 
Fiche 90-373,82/10/11,9310370391 

9310150389 8upp) to 830719 application for amend to Lleens* DP41-7A re 
securltu plan ncl withheld (ref 10CFR73 31) 

CRANE, P. A Pacific OBI & Electric CD 93/10/12 DENTON, H R , 
MIRAQLIA Office af Nuclear Reactor Regulation, Director, 2pp. 
19703 277 24X Fiche 30-275,02/10/12,9210130309 



78 



DOCKETED ITEMS 



8310330271 Clarifiei 921007 statement rr required ttji, i tructur* s & 
component! for plant operating modes for indepindent design 
verification program 

COOPER, WE Teltdijna Eooineering Servicn 82/10/12 EISENHUT.O 
Division of Lie truing 4pp 15790 191 24X Fiche 50-275,33/10/13, 
B21O2SOS91 

B21Q290Q97 Requesti eip lanatlon of protest & chronology df a.v*nis in 
uiJlich TlBdu.ne discussed contt (bA review of plant ui/util. 
Dichtel & SJ.W Info required to determine presence of 
conflict at interest Met-tins requested 

HfiOHW. H H Kirlpatvicl, Loclfijrt, Hill, Chr iitopher 4. Ph i 1 1 i pis 
IfltHJN. H H California, State of B3/1Q712 COOPER, W E Tlei!nnB 
Enslnserins Service* 2ap 19953 361 24X Fiche 50-278,02/10/13, 
8g 10290097 



Inspection reports, IE Bulletins t correspondence 



9210070007 FleiDotidi to FQIA renuest for tight categories of r, co r^i 
<taam generator* * iteam turbines App A documentt provided 
in R Udell FOlft Request Bl-313 Forward* documents Hited in. 
App B 

FEUTON, J M Division of Rules and Records 82/OB/lO I fflio J 
Hi n thro p, Etlmnjn, Putnam & Roberts 9pp 15645 0^3 3**. 
Fiche 50-OOO. B2/OB/IO, 8210070007 

--B2 10070 131 Forwards tabulated data on steam gennratnr intp 1 rjji 
f*.ciliti* Dat* should be provided to licensee* 
IPPDLlTDiT Operating Reactors Aiieslment Drarich (la/01/01 
VAROA, S Operating Reactor* Branch I Spp 1 5643 t;i| III 
Flch* 50-000,92/06/10.8210070007 



8=10290214 PT-ovidn NFtC recocnnund ation re Phaia II of indvpind ent 
dtiign virFlcitlon program Phase II p raj ram plan & 
rti{uirmt-nt that Piiail El revi tuJ/evaluation t be completed 
prior to fuHi load/lou pourr dt-cition approved 
DIHCKSi W J, Office of the icutiv Director for Operation! 
SECV-B2-4t4 92/10/13 61pp 15076 3&1 24X Ftihe 50-K73, 
93/10/13, BS 10 2702 14 

62101905-03 Adviiei that tiiio former Dchtl *mploij(i*i uill be retained 
an Independent deiign verification program rndividualn dp 
not violate procedure on conflict of inter* *t E> mill not 
vert'^ war I p artlc tpabad in it Bechtel emplagu 

COOPER, W E, TeleifHjnB Erirj I ncpri ng ServleBi 83/10/14 DENTOW, H n 
Qfflce nf Nuclear Rtactor Rigjlatlon, Director ENOEt-KEM, H H 
Region 3, Office of Director MANEATIS.O A Pacific On t Electric 
Co, 3pp 1S791 184 24X Fiche 30-275. BE/ 10/H. 8310190533 

&aiOI*P05a4 Provide* preliminary reiponn to fl 20701 raqueit for re-vieu 
op seven pointi re validity oF BNL rsiults Si gnaric 
impllcatiDni in -fiml rapt dancernlng analijiii of facility 
COOPER, H E Telidijna Emgineerlna Services 8S/10/19 DENTON. H R 
Office of tJ-uc tear Reactor Regulation, Director 3pp 15791 137 
24X Fich* 5O-a7S.B3/10/15,B2l0190584 

9210220371 Forward i addl lectioni for Phan I final re,pt r design 
verification program per coimiitnent made In 620B20 Itr, 
Rnvition A to outline Phase 1 final ript tc reviiian to 
lectiani prevloutlu submitted 

CRAKE.P A Pacific Oai t ElectT-ic Co 82/10/19 EIBENHUT.D 
Dlvlifon of Lictnting tOIpp 13779 333 24X Fiche , 50-275. 
82/10/15,6210220371 

8210290210 Identified concarnt riiulting from revieu of URB/Glume 
containment annulu* itructure model ivaluation Conctrni 
i<ultd in iiiuance of ED! FU*i 3006 tt 3007 

HRAV, R Tffledgne Engineering Services 98/10/19 MAMEATIS, A 
Pacific Ojt a l*ctrU Ga 4pp 13783 293. 34 K 
Flehe- 50-375, BS/10X1S, 3210350210 

92I02S0316 Gammnti on Region 5 H 209 13 memo re Phaie II of in riff per Bent 
dicign vii-if icition projram.pir BEIOOi refueit Change In 
Ph> II not Indicated 

COPPER. H E Teledyno Engineering Service* 8a/lO/I9 E1BCMHUT. D Q 
Division of Licencing 3pp 15790 04B S4X Fiche SO-275. B2/IO/I9, 
G2102S0319, 

B2102BOB72 Not! Clis of planned 921 loi moating u/plant perconnel to 
audit togiitic: plJinnlnj for activlti** performed 



HEEDV,R F, fl F Rtufgi Inc B2/10/15 COOPER, UE TBledvne 
Englneerini Sarvicet 3pp 15B37 292 24X Flcfte 30-373,82/10/13, 
Q210SB0273 



8210060133 Forward! IE Inap Diptl 50-275/62-26 b 30-yay/Cia-l'J an, 
E2072fi'3OiOaii6~2D d OB30-090I Mo noncompl lanes noted 
1 SHOP, T W Divliion of Huiidtnt. Reactor Project t. frf trier br 
Programs 82/07/17 CRANE- P ft PacifU Oai t aiectrtc Co i 
15&14 307. VAX Fiche 50-379,03/09/17,8310060133 



8210060141 TE Imp ilepta 50-275/83-26 & 30-323/02-1.) on I!.'OJ 
OS16-20 ( OaSO-O'POl No noticompliance noted Major are4l 
Jhtpeitrnd sit* tour & mod to piping !< >lettrlc) riciu^v 
supparti reiultlng from revised annulus lelimlc ipeclr^ 
DUnDOJH.J F , ZWETZIO.O 11 Division of Resident, llmctor 
Engine* ring Programs B2/09/I7 9pp 15614 31] ,HJ 
Fiche SO-275.B2/09/I7,B310060133 



9209190233 IE Info Notice 80-35, Suppl 1, "Leak ins t, Ultlad)e4 1-l 
Implant Seeds " Svc lilt encl 

CODG.U I Division of Fuel Facilities, Material* (, IJaftnujrit 
B2/1O/06 Conioliiiatad Edison Co of NBUJ York 6App ISftt 

24X Fiche 90-000, 02/10/06, 92081 90233 



6203190236 IE Bulletin 83-03. "Stress Con-mi on Cracking Lti IMtl- 
Mal 1, Lrge-Di a,meter, Btainleu Steel, Rec ircu lallon iliji 
Piping at OWR Plants " Svc list encl 

DEYOUNO, R C Director's Dffic, Office of Inipicllon <biid 
Enforomtnt 32/10/14 Consolidated Editon CD of Ht\i Vat* 

I19pp I59IO 125 24X Ficfte BO-000, B2/10/ 14, BSOB! TOJJD 



B21O2B02B7 Foruards IE Inp Hept 50-275/82-29 c-n OaoRJ'C "LOUil Po 
noncomp 1 i ante noted 

BISHOP i T W Division of Resident* Reactor Project h luginieil*^ 
Pragrami BZflO/lA CDANEiP A Pacific Oas (. Elutrle Co til 
13B39 010 2flX Fich* 90-273.82/10/14.9210280207 



S2102B0303 IE {nip Rupt 50-275/B2-29 on B30a29-10(>J No nurci 
noted Major arcai inspected plant aperdtl ons. lurvrllltnt t 
Seat ing. phi^iital securi tijiinaintr Si TMI task action p\tn 
ttami 

CARLSON, J D , MENDOMCA.M M , tURSCH, D F Divliian of Utii 
Reactor Project fr En]inBerlng Programs B2/IO/1G Spfr 
15B3? 014 24X Fiche 50-275,02/10/14,32102(103137 



9210330324 Foruard* IE Imp Repts SO-27S/82-30 ti SO :IJ,I/11J -1* ** 
830914-16 No roncompliance noted 

BISHOPiT U Division of Resident. Reactor Projflet 1 ( PH fcni if i"j 
Programs 82/10/14 CRANE. P A Pacific Oat t. [ILictrlc C-3 >il 
18039,019 K4X Fich 30-275, 82/10/14. S2102B033'4. 

9310280330 IE In.p Repti 50-275/82-30 t, 50-323/98-14 ntl fIJ-jVU Ik 
noncompliante nottf Major areas inspected implement* I ion e 
indepandent verification progr*mi including indapindirti 
Hualif icatloni of pertannel l< imp limtnte t ion of QA fTogran 
MORRILL.P.J , ECKHrtRDT, J H , BISHOP, T H Dlvltlonof H\ti-t 
Reactor Prajct li Engineering Prograns 82/IQ/OD iff 

i, a4X Fiche 50-273,82/10/11.9210200354 



Periodic operating reports (c related corrasponitenci 



3210290319 Foruarils "Diablo Canyon Nuclear Power Plant InHH^itil 
Deijn Verification Program," semimonthlu rapt for Hipt 
1982 

COOPER- U,E, TBledyne Enginiiring Servlcx 82/09/B4 ^CKr^-u-t 
Office of Nuclear Reactor Regulation' Director, ENOfUEW. H H 
Rllon S. Office of Director MANEATIB, <J, A PelMt 9*1 t tlt.i 
Co. ip, IS634,U9 24X Fiche 50-278, 82/09/24. 



9210290322 "Diablo Canyan Nuclear Poutr Plant Indtpin'int C* Ujn 
Vtrlf ication Program," semimonthlu rvpt for flept \103 
* Talftdune Engineering 6rvlc*. 82/09/24 A9pp 
S4X Fiche- 90-279182/09/24,9310290319. 



3210130191 Forwards "Bemimonthlv "'P* 23, Diablo Cany an VitllUi IIM 
Proflram. " 830921-1004 

CRANErP A Pacific Oas d Electric Co B2/10/OB OENfCw, M 
Of (leu of Nuclear Reactor Regulation, Director GNGELKCtt, R t* 
Region 9, Office of Director lp, 1 3477 294, iHK 
FIeh: 30-275, B2/10/OB,92101SX>131 



DOCKETED ITEMS 



79 



--210150159 "Semimonthly Flept 23, Diablo Canyon Verification Program." 
B2O92 I - 1 001 

HC.CH. J 9 Pacific Gas & Electric Co 82/10/OS Slpp 13i97 295 
24X Fiche 50-375.33/10/00,0210150151 

9210330197 Forwards "Independent Design Verification Program." 
ssrumonthlu rept for Oc t 19B2 

COOPED, H r. Teledyne Engineering Services B2/IO/OB DENTQN, H R 
Office uf Nuclear Reactor Regulation, Director ENCELKEN, R H 
Re? ton 5, Office of Director MANEAT1S.G A Pacific Oai t, Electric 
Co 3pp 157B? 241 S4X Fiche SO-275, B2/ 10/OB, 821QS50197 

--EJ2I0250201 "Independent Design Verification Program," semimonthly rep t 
for Qit 1982 

' Telerfijne Engineering Services S2/IO/OB 3<?pp 15787 267 
24X Fiche SO-375. 02/10/08, B31Q250197 



Advises that FtL Cloud ftsoc iates, I nc has not issued open 
ifcen repts during prior reporting period 

DENfSOM.e Robert L Claud Associates. Inc B2/1O/OB DENTOM, K fi 
Office of Nuclear Reactor Regulation, Director ENQELKEN, R H 
legion S, Office of Director MANEf\TI9,G A Pacific Oas E. Electric 
Cn Ip 137S3 31S 2flX Fiche 50-275, 03/10/OS, B210250221 



8210290222 LEH 02-Q09/Q1T-O an B310O7, tasti ng on auxiliary. i*ltuate.<p 
iy* revealed sy* susceptible to uat*r hammer effects during 
anticipated operational transient* Caused by uattr column 
separation tr recombination at piping <lop e change 
KAEFER.H U Pacific QBS & Electric Co 03/10/1-? Region S, 

Office of Director 2p p 13893 227 24 X Fiche 30-273, BSflQf IB. 
B21O270219 

T Hearing transcripts an non-antitrust matter* 

8310290370 Unofficial transcript of 831020 public discussion of Phase 
II reverif ica tion program In Uaih ingt on. DC Pp 1-113 
Supporting documentation end. 

i Commissioners B2V10/2O I44pp 15B69-O93 24X 
Tien* 50-275, B2/lO/3O,0ai02'?O370 



Foruartti- transcript o-P Commission Q2103O meeting to 
receive NBC briefing on proposed scope- of Phase II of 
independent design verification program & S21O17 meeting u>J 
utll J- participant* re program t, 5ECY-B2-41 4 W/o ncl 
CHILK.B J Office of fcha Secretary or the Conuni as i on B2/1O/21 
Office of th* Executive Legal Director IP 13779 Ell 24X 
Fiche 90-273,82/10/21,0310320410 



B21O2502-17 Submits Semimonthly Progress Rept 20 for 820903-10O9 Mo open 
item repts issued, but tuo open item repts identified 
Individuals completed acceptable statements re potential or 
apparent conflicts of interest 

HEEDV, R F R F Keetfy. Inc Q2/10/OQ DENTON. H H Dffica of 
Miff 1 en r Reactor Regulation, Director ENOELKEN, H, H Region 5, 
Office of Director MANEATIS, A Pacific Oas 4i Electric Co 2p p 
I57B6 342 24X Fiche 50-275,92/10/00.3310250247 



orwards DC t 19S2 semimonthly rep t, c onai i ting of Open Item 
fiepts Q007~BOaO 

C ESTAK.F Stone !. Webster Engineering Corp. Q2/1O/OB DENTDN. H R 
Office of Murlear Reactor Regulation. Director EW3ELKEN. R H 
Region 3, Office of Director MANCATIB.O A Pacific GIB (. Eloctric 
Co 34pp 15790 097 2-1X flcho SO-275, S2/10/OS, 821O2SO30B 

D21&EQOI57 Forwards program managers 3rd Friday Oct 19B2 r*pt re 
independent design verification program 

REEBV, R F R F needy, !nc B2/1O/15 COOPER, H E Taledgne 
Engineering Services App 15B37 215 24X Fiche 50-273,03/10/15, 
B2103BOI37 

D31027O236 Forwards "Diablo Canyon Verification Program," Semimonthly 
Rept 24 for B21005-1B per Commission Order CLI-81-30 
CfMNE, P A Pacific Gas *. Electric Co 82/10/23 DENTON. H, (I 
Office of Nuclear Reactor Regulation, Director ENOELKEN, R K 
Region 5, Office of Director Ip 1 5B29 222 SAX 
FichP 50-273.93/10/22,0210370236 



DOCKET BO-377 PEACH BQTTOH ATOMIC PDHER STATION, UNIT 2 
J Insurance & indemnity inf ormit ion 



B21006Oa?6 Forward* EndnriBmont 99 to NELfA Policy. NF-140 fc End ors arren 
S3 to HAELU PoliCiJ HF-67 

B(JADt.E. E J Philadelphia ElactrU Co B2/09/30. SALTZMAN, J 
Assistant Director for State & Licen*ee Ralotlani 3pp, 19619 HO6 
E4X Fiche 50-H77. BH/09/30, 



P Operating licence stage documents & correapondance 

9210260013 Respond* to FOIA raquaat for all i nttrna 1 , non-pub 1 Ic 
t ocumont, memos, evaluation repti tt other matl dealing u/ 
nuclear plant operation* Foruard-s doc umtntt listnd in App A 
FELTOH-J H Division of IJulei and 1 Racords SB/09/17 MCINNI5, 
MIUI b Observer 5pp 19B60 O69- 24X Ficfia 30-000 r Q2/09/I7. 
8210280013 

B20831Q034 Foruiardi draft info notlo ra dr f i e tune t a* in air filtration 
& ventilation BUI, Notice ba&aif on radioactive resin raleas-B 
at Pilgrim 1 & on four relatad ivent* at otllBr plants 
involving df Icienc iei In maint t tentinj of filter t(j*. 
MATTBDH, fl J Division of B u *tmi Integration <pot 911003). 
B2/OB/03 JORDAN, E, L Dlviion of Englnnnirlng ( Qualitv 
Ass-uranca 3pp ISOi 1-084 &4X Fiche, 30-000, 32/09/1.7. 6210290013 



--EJ210370240 "Diablo Canyon Verification Program," Semimonthly Ropt 24 
far 92 1005- 1 9 

Pacific Oas < Electric Co 82/10/22 52p p I5S3B 233 34X 
Fiche 50-375,82/10/22,0210270336 

8210SS0211 Forwards "Diablo Canyon Nuclear Pouier Plant Independent 
Design Verification Program," semimonthly status rept for 
tkt 19B3 

CDDPEfl.H E Teledyne Engineering Services B3/IO/23 DENTuN, H, R 
Office of Nuclear Reactor Regulation, Director EWQEE-KEN. R H 
Region 5. Office of Director MAfJEATIB,G A Pacific Oat & Eloctric 
Co 2pp I5H3S 001 34 X Fiche 90-275, S2/ 10/33, SS10SB021 1 

B2I0330212 "Diablo Canyon Nuclear Poyer Plant Independent Design 
Varlf icatinn Program," semimonthly status rept for Oct 
1733 

Te Ictfyne Engineering Service* B2/1O/S2 76pp 15038. 003 
24X Fiche BO-375, B2/10/22. H2102B021 1 

3 Jleportable o c currencies, LERa t related correspondence 

B2IO250055 PNO-V-B2-043 on B21016, unusual event declarid when gran 
fire started In 500 kV switchyard On 031017, three SCO fcV 
circuits tripped, resulting in loss of all offsite pouter 
Second unusual event declared 

STEFlMBEnO.D M Region 5, Office of Director 83/10/iA Ip 
15737 100 24X Fichu 80-275,02/10/14.8310350058 

821O2702I9 Forwards LER 82-009/01T-0 

EKIFFER.J D Pacific Oas i Electric Co B2/10/18. ENOELKEN.R H 
Region 5. Office of Director Ip I5B53 336. 24X 
Ftche 50-275,32/10/10,9210390219 



8210030320 Forward! "Thermal happing Rept 02-0 For 920018 for Thermal 
Monitoring ne-quirxnentii " p*T rtp p B to ETT3 

U ILL BEY, W B PhfUdalphta Electric <Ca 82/07/S8 JPPOLITQ, T, A 
Operating React ori Branch 3 Ip 13601-336 24 X 
Fiche 50-277. 82/09/23. B2100S03BO 

B210050321 "Thermal Mapping Rapt 2-3 for BBOB1B far Thernil Monitoring 
Raquiramcn t> " 

* Philadelphia Electric Co BE/O^/SS 4pp 15SO1 33? 24X 
Fit-he 50-277, fla/09/2B,aaiO<JSD320 

3210150202 Foruiarde "Rapt oP Plant Startup Follouiing Fifth RFullng 
autagi " Tab 19BH 

ALDEN.W M, PMladtlphla Electric Co B2/1O/06, HAVNEB, R C Hog ion 
L. Office of Director Ip, I57OS' 046 24 X Fiche 50-277-92/10/06, 
S21O19D5GS. 

8210150292 "Rspt of Plant Startup Fol lowing Fifth Refuilini Ou-tag, " 
B20R19 

ULRICH, HT Phil*dlphl Electric Co. 82/Oa/2B 7pp. IB703 St>7. 
24X Flchi; SO-277, 82/10/04, 8310130202, 

82102^0329 Submits info r potential problem u/ventllation sij* 

aitaciated w/battary & emergency lulfachgear roomi solution 

to p rob lam 4c chadula for conpletion of necetiarv modi Morf 

will be completed by 831231 

COONEV.r) J. Philadelphia Electric Co 02/1CVI4 KAVNEB, Ft C, 

Region 1. Office of Director 3pp. 19803. 2O 9 S4X 

Fiche: 30-277. 82/10/1 4. B21 0360029 

&2102OQQ46 Foruardi application to amend Licence* DPF1-44 & DPR- 36 to 
reflect mods reD,uired to mst crltirin of NUREO-OiAl, App Ai 
"Mark I Contninmont Unng-Tsrin program. 1 " 

BRADLEV, E J phil*d*Jpha Electric Co. B2/1O/13 DENTON . H, R. 
Offico of Nirelo*F Reactor Re-gula-tlon, Director. Ip. 15736:139. S4X 
Ftcha: 90-277, BS/lCf 15. sat 0200046 



80 



DOCKETED ITEMS 



-83IC20O063 Application to amend Licn* DPR-44 & PPR-S6 to reflect 
modi required to meet criteria of NUREQ-06cl, App rt, "Mark I 
Containment Long-Term Prooron " Affidavit 6 Certificate of 
Svc end 

BWJEfi.E . BRADLEY, E J Phi ladetpfi I. Electric Co 82/10/15 
7pp 15754 136 24X Fiche 30-377,02/10/13.6210200046 

-8210200063 Proposed Tacti Spec pages, reflect Ing mod* required to mef 
cntria of NUREO-0661, Af p AP "Hark 1 Containment Long-Term 

Philadelphia Electric Co S2/10/15 6pp 15754 143 H4>! 
Flehe 30-377-92/10/13.0210200044 



B210070I8B Inu-rvic* imp rept completed during B20220-07Q3 refui.i-| 
outage 

* Philadelphia Electric Co 82/09/20 96pp 1S439 2?V an 
Fiche 50-277, 02/09/39, 0210070177 

6210150069 Submit* final response to IE Bulletin Bl-Oli "Gurvel 1 1 - i 
of Mechanical Snubfien " Pacific Scientific Co manuftttuni 
49 itiechani-cal inubbers ut ill led it facility Hit of jnoifi) 
numberi twit I 

DALTROFF.S L Philadelphia Electric Co B2/IO/Q4 IIAYJJFB.n C 
Region 1. Office of Director 2pp 1S701 341 24X 
Fiche 30-277, BZ/10/04, 8210150069 



6210210297 Submits addl info re util Bl 1239 response to NUREO-OB03. 
"gafstij Concerns rtunciated H/Plpi Breaks In HHJi Scram 
Sijs, " in response to MRC 620924 roiuest 

DALTROFF.S L Phi larfniph I a Electric Co B3/IO/1B STQLZ. J F 
Operating Reactors Branch 4 IQpp 15744 267 24X 
Fictie 30-277, 82/10/I9.B21021Q277 

B2102IQ33G Proposes B3O131 at date for responding to NUREQ-0737, E tem 
II B 3. "Poat-AcclJsnt Sampling Sv " 

E-ALTRDrHS L Phi larfetph 1 a Electric Co B2/JO/13 STOLZ.-J F 
Operating Reacfcar* Branch 4 2pp 13763 063 24X 
Fiche 30-377. 92/10/i9iS21oai0330 



IE Info Notice 80-35, Sup pi 1. "Leaking & DUlodftEJ 1-]1 
Implant Setrfs " Svc lilt uncl 

COBC-L I Diviiion oF Fuel Facilities Materiali A Biltjvtttt 
32/JO/OG Coninlidated Ediion Co of New York Aftpp 13741 J' 

24X Fichc SO-000, 82/IO/O6, 0203190233 



62-10130291 Ack receipt of B20929 Itr informing WHC of tttfn 
correct vlolationi noted in IE Imp Repti SO-277/Iia- 14 t, 
50-278/B2-14 

srAROSTECHI.H Diviiton of Project t Rendent Progrann 
DALTROFF, S L Phi Jadelph ia Elec trie Co lp 1S670347 
Fich 50-277,82/10/06.9310130291 



e2102S019i For ward i reioonie to draft tachnical evaluation rep t re 
cdntral of heav<| load 1 * Addl info r*nuitd In 620405 tetcon 
one 1 

DALTPIOFF.S L Phi 1 atlHtpli ia Electric Co 82/10/33 STQLZrJ F 
Operating Ksacton branch 4 43pp 13339. 136 24X 
FichB 30-277, B2/1O/3S, 82I02BOI96 



0210130296 Reipondi to NUC B30901 Itr re viqlatic.nl noted In It. I 
Rapti 50-277/BS-14 tc 50-27D/B2-14 Corrective acttoni 
de'vctlva lacking machanlim replaced t periannel intructtiJ 
to b mare forceful when checking locked doors 
DALTROFF.S L Phi ladel ph ia El ectri c Co Q3/O7/a<? 

Division of Project 4 Residatit Programs 2pp [SA7S1 HI! 
Ffche 50-^77, &2/10/06i E3H10I3O391 



0510230193 "Structural Andlijili of Peach Bottom Uniti 3 fc 3 Ktactor 
Prexiure Venel Kearf Drop. Shroud Hnad Aiienbli; Drop d Bto*ra 
Dr^ar Aiaemblu Drop Condition! " 

HEBREW, M L , MQK,<? General Electric Co B3-33 82/OB/31 
3Bpp 1SB39 IS1 H4K Ficfia 50-277, B3/10/25. 62102a019i 

~Bal02aOS01 "Lifting DevicBi & Lifting Point* Strti* Anali/iii for 
Reactor Preiiure Veisel If* ad Sti-orm-bad, Stoatn Dri/er/ 
Saparator Sling & S^c Platform to Caaptij U/NUREO-0612 for 
Peach Uotton Unit) 2 t. 3 " 

KOMQ.V H General Elactrlc Co WSE-M-03BS 83/05/31 3tpp 
13839 219 24X Ficlie SO-Z77, BS/ 10/23,831 02B0194 

aal02BOB04 "Liftlnj Device* t< Llftins Polntt Slre* Analyiin for Fuel 
Pool Oate Lifting Paints^ Hgdraul Ic Tenilonar Lifting Device 
tt Lifting Points 6 Reactor Presur Venel Insulation 
Removal Lifting Device b Insulation Lifting Points " 
SIUHBKI.TJ Philatfeiphia Elettric Co WSEQ-72-07B2 B2/07/3I 
29pp 15B39 HSO 24 FichB 50-277, B2/10/H5. 82102DOI 96 



IE Bullatin Q2-03, "Btress Corroiinn Cracklfig In Ihuk- 
MaSl' Large-&mmeter.St*lnIeu Steali Rec ircu lation Gy* 
Piping at BWR Plants " Svc list encl 

DEVOUNO.R C Director's Office, Office of Inipectlan anil 
Enforcement 83/10/14 Consolidated Ediion Co of Neu York 

HSpp I5B1O 133 24X Fiche 30-000, 02/10/ 14, B20nif03.ta 

R Periodic operating reports & related correspondence 

B2101S0336- Forward* Thermal Happing Rep t B2-4 for B209CW for ^r* 
monitoTing requirement*, per App to ETB 
UILLSEYiU D Philadelphia Electric Co B2/10/OQ 
Operating Reactor! Branch 3 lp 13704 277 24 X 
FichB 30-277,82/10/08,6210150336 



B2101303-&D Therm*! Mapping Rept 82-4 for B20909 
* Philadelphia Electric Co 82/10 /OB 4pp 
Fich* 30-277,aa/10/OB,Bai0150356 



Inspection rsportsi TE Bulletins fc correipondence 

B210070317 Foruards IE Imp Rept* 30-277/92-20 b 30-270/82-1? on 
630-916-20 t- notice of violation 
MARTIN, T T Division a? Engineering &, Tichnlcal Program* B2/09/B2 

DALTRDFF.aL Phi UJ*lph la Electric Co 2ap 19634,139 24Y 
Fich* 50-277, 62/07/22, B310070317 



8210070322 Notice of violation from ln*p on BEOB 16-20, 
DIvition oP Engineering b Technical Projranis 
13634 137 Z4X Fiche, 80-277, 82/09/22,821 0070317 



B21022O190 Foruardi- monthly operating repti For Bept 1102 

COGNEY.JI J Philaifelahia Electric Co 83/10/13 Dlretl^r ' 

Offlcaj Office, of Inspection and Enforcement lp JB777 2'3 
FichB 30-277, 82/10/13- B210230190 



B210220194 Monthlg operating repts for Bept 19P2 
ALDEN.HM Ph i larflphla Elec trie Co B3/10/19 
24X Ficho 50-277,82/10/19,0210220190 



lOpp 



3 RcportaltlB occurrences, LERi t, related correipondinca 



B210070330 IE In*p fipt 50-277/62-20 fc SO-27B/S2-19 on B20816-20 
Nanconpl lance noted no notification given for abnormal 
degradation In primary containment, evlileiicel by unacceptable 
local leak rate t*st resulti for nine Isolation valvei 
PULLAN!,S V , BETTiEMMAUBEW.L Diviilon of Enainrlno li Tecnnical 
Programs 82/09/14 7pp 15634 13B 24X Fiche , SO-H77, BH/O9/22, 
921007O317- 

B210150299 Forwards IE In.p Repts 80-877/82-19 t BO-K7ES/S2-1 9 on 
820807-0915 No nonccmp I lance noted 

ErAHOSTECKI,R Divition of Pi-ojsct l> Ruldent Programs. 05/09/27. 
DALTRDFFi 8 L. phi l*dl ph ia El ectr it Co Bpp 1S707 334 SIX 
Fiche- 30-277i B2/09/a7r 3BI01 S0299 

~flal015030'2 IE Insp Repts 50-277/S2-J9 t SO-37B/B2-I8 on e20B07-0?lS. No 
noncompliance natif Major anas inspected opr*tic-n*l 
laf ttij, radi atioii protectloni physical ttcuritujr control roon 
ctlvltlai i IE bulletin followup, 

BLQUOrf, A ft. , MCCANE, E C Division of Projact h Reslitent PrDgrvmi. 
B2/09/20 l?pp. 18707 236 24X Fi eh' 50-277, B2/09/S7, B210130299. 



B210O60074 Foruardi LER B2-027/01T-0 Detailed event an'lutlt <"t 
CDOMEV. M J Philadelphia Electric Co B2/09/24 HAYMfS.R C 
Region 1, Office of Director 3pp 1561S 047 24X 
Fich". 30-277- B2/O9/24.B210060074 



8210040033 LER 63-087/011-0, on B20910, *vc air valve to conUi r 
found open Caused by ptrionntl failure to make entrv In 
locked valve lo-g book uihen valvei opened Valve claftd V 
lackBd 

COQNEY.M.J Philadelphia Electric Co, 82/09/24 Rigid* 

DfPiee of director lp, 15619 050 24X Flche, BO-377. 
6Z1 0040074 



32IOO6O393 LER B2-O2S/03U-0 on B20B27, cuh 1 IB performing t 
teit'C RHR piimp room C cooling fan mould not start ill 
utnmatic Caused bij corroded contacts on C fan suite* 
DPS O4OO-16 Siultch reulred b calibr 

COOMEV.H J Philadelphia Electric Co 02/09/34 KAVS r C 
Ration 1. Office of Director lp 13613 194. 34 X 
Fith BO-E77 J Sa/09/24.B2I0060333. 



B210070I77 Forwards inservlce intp rept canpletm during 820220-0703 
refueling outage, In-ij rnuiTmmti mt tati sCactorl 1(|. 
CQONEV.M J J>hilad<lphla EUctPlc Co 82/09/29 HAYNEB, R. C 
Rtgian 1, Dffic* of Director. lp i363S 298. 24X 
Fiche. 80-277, B2/09/S?, 8210070177. 



DOCKETED ITEMS 



81 



821QQA0047 LEO 93-026/031-0 an 830900, LIS-2-3-73B, real tor Lo-Lo-Lo 
Eontainment i prag interlocl discovered out of calibr 
Caused bu setpaint drift af Rosemont Model 1151 trip unit 
Drvl ce recal i tr 

COQNEY. M J Philadelphia Electric Co B3/09/H7 HAYNES, R C 
Region 1. Office of Director IP 19615 OBB 24 X 
Fiche 30-277, 82/09/27,8210060047 

B21G060177 LER B2-036/03L-0 on 02O831,RHfl pump 2A failed to start 
during test on Ffl-2-10-143 Caused by uncharged breaker 
closing; spring due to faulty closing latch monitoring switch 

COO-JEV, (1 J Philadelphia Electric Co 33/09/30 Region 1, Office 

-of Direttor Ip 15615 099 24X Fiche 50-277.92/09/30,0310060177 

6210]S04Cl> LER B2-031/03L-Q on 820B31, smoke detector 314 in Hnmrgencij 
suit^hgear room B failed to cal ibr to Tech Spec limits 
Caused dij Faulty imotc detector Detector replaced 
COUNEV.M J Philadelphia Electric Cp Q3/09/30 HAVNF8, R C 
Region I, Office of Dirsctnr Ip 1 57O4 029 24X 
Fith* 30-277. H3/O9/30, 921O1 50400 

6210150194 Forwards LER G2-Q30/O1T-0 Detailed event analysis submitted 
COOMEV.H J Philadelphia Electric CD 83/10/01 HAYNES, R C 
Region 1. Office of Director 3pp 13707 311 24X 
TicNe 50-377. S2/1O/01, BS1Q1 50184 



--02I0050321 "Therm*! Mapping Rp t B3-3 for 820B1B for Thermal Monitorinc 
Acquirement! " 

Philadelphia Ele.-tr-Jt Co Q3/09/3B 4pp 15601 339 24X 
Fiche 50-277,82/07/28.9910090330 

S210260329 Submit* info r potential problem u/vnti latinn sys 
associated Li/battery & emaroencv luitchgoar roomi. tolut ion 
to problem b schedule for completion of nac eviarii mods Modi 
will be completed by 831231 

CQONGY.M J Philadelphia Electric Co 82/1O/14 HAYNEB. B C 
Re-oion 1. Office of Director 3pp 1SBO3 SOS 24X 
Ftche 30-277,82/10/14.8210360329 

8210EQ0016 Forwards application tc- amend Licenses DPR-44 & DPR-56 to 
reflect modi required to meet criteria of NUHEO-Q661, ftpp A. 
"Mart I Containment Long-Term Program " 

BRADLEV.EJ Philadelphia Eloctric Co 82/10/15 DENTON, H R 
Office of Nuclear Ftoactor Regulation, Director Ip 1 37S6 135 24X 
Fiche 50-277, 82/10/15, 8210300046 

6210300043 Application to amend Licenses DPR-4fl t> DPR-SA to reflect 
mods reo.uird to maot criteria o* MUREQ-Oitl, Ap p rt, "Hart I 
Containment Long-Torn* Program " Affidavit t Certificate of 
Svc end 

BAUER, EC , DRADLEV.E J Philadelphia Electric Co 83/10/15 
7pp 1973S. 136 24X Flcih* 50-277, 82/10/ 1 5, B31020004& 



--3210I5O179 LEfi 82-030/OIT-O on 020917, u/both units at power, imall 
quantity of slightly contaminated water released from 
recorbiner bldg into stoim drain SIJB Caused by spurious 
action of Orinnell Madel 6 fire lupprescion valve 
CQDHEV.M J Philadelphia Electric Co H2/10/01 Region 1, 

Of fit* of Director Ip 15707 314 34X Fichu 50-277,83/10/01, 
3210150154 

nlO2e.O113 LER B2-029/03L-0 on S209I 5, dur ing power, supervi sorg fllarm 
occurred indicating firo sys problems Investigation revealed 
beat detectors in startup suitchgear bids inoperable Caused 
&Y disconnected circuit breaker due to stripped screw 
CODMEV.M J Philadelphia Electric Co 82/10/14 HAVNES, R C 
Rag ion 1, Qffico of Director Ip 15005 247 24X 
Fiche 5O-377, Ba/10/lfl, S3103601 1 3 

82I039O36A PHa-I-B2-06B on 821024, pr imary sijs relief valve began 
cjcUrsg during startup after moint sh utdoun. causing iiji 
5'jjelJ which resulted In feed pump trip on high reactor uater 
level follauej! till low love] icram HPC I manually Initiated 
I'.CCfiBE.E C , KEIMIfl Ragion 1, Office of Director 83/10/25 Ip 
SS053 031 34X Fiche 90-277,02/10/35,8210390366 



DQCKEF 50-2'7a PEACH BOTTOM ATOMIC POWER STATION, UNIT 3 
J Insurance ti Indemnity information 

6510060296 Forwards Endorsement 99 to NELIA Policy NF-140 t, Endorsement 
5a to HAELU Policy MF-67 

URADLEV. E J Philadelphia Electric CD 83/09/30 3ALTZMAN, J 
Alii 4 taut Director far State & Licensee Relations 3pp 1961? 20i 
24X Fiche 50-277,82/07/30,0310060396 

P Operating license stage documents & correspondence 

B207-09G201 Forwards application to amend License DPR-56, changing Tech 
Sp*ti to reflect changes to ODYN computer code ti including 
F!vUlon 1 to "Supplemental Reload Licansino Bubmittal for 
Peach Cotton Unit 3, Reload 4 " 

OPADLEV.E J Philadelphia Electric Co 82/07/06. DEN TON - H R 
fifties of Hue 1 ear Reactor Regulation, Director In 13708,113, 24X 
Fiche BO-27B, B2/07/06, 620709O2O1 

--03O70903O8 Application for amand to License DPR-B6, changino Tech Specs 
to reflect changes in analgsei resulting from corrections to 
ODYN computBT code 

DALTflOFF.3 Phi Udelph la Electric Co 82/07/06 6pp 13708.113 
24X Fiche 50-27B, B2/07/06, 0207090H01 

9207090315 Tech Bpec Tables 35K2S.35K31, Flflures 3 3 K 1 t, 
3 5 K a, suppnrtinB application for amend to Lic*ne DPR-3i 
i Ph(ldlpJiJa Electric Co. 82/07/06 4pp 13788 120 24X 
Fiche 30-278,32/07/06,6307090201 

--B2O7O70234 Revision 1 to "Supp 1 amenta 1 Reload Licon*ino Submlttil for 
Peach Bottom Atomic Pouer Station Unit 3. Raload 4 " 
LEASER. -J D , ENOELiR E General Electric Co YI003J01A20 HOI. 
82/Oi/SO 41pp 1378B- 124 24X Fiche 90-S78, S2/07/Oo, SS07090SO1 



B2102000AB Proposed Tech Spec page*, r of 1 net ing mod* reqciired to meat 

criteria of NUREO-06A1 , rtpp A, "Mark I Containmsnt Long-Term 
Program " 

* Philadelphia Electric Co 82/1O/I5 (bpp 15736 143 24X 
Fiche 30-277, B2/1O/13, B3102OOO4& 

8210210297 Submits odtfl info re util 811229 rnBponse to NUHEQ-OB03, 
"Safaty Concerns Associated W/PIpo Breaks (n OHR Scram 
Byi," in response to NRC 920824 request 

DALTROFF, 8 L Philadelphia Electric Co 82/10/19 8TQLZ, J, F 
Operating Reactors Branch 4 lOpp 13764 267 24X 
FiChB 30-377, 8K/10/13, B21021Oa7 

S210210330 Propose* 83O131 as date for i>ep and ing to NUREO-0737, Hum 
II 11 3, "Post-Accident Sampling B<fi, " 

DALTROFF, 8 L Philadelphia Electric Co SS/10/13 BTOLZ-J F 
Operating Reactor* Branch 4 2pp 13743 O43 34X 
Fiche 50-277, 82/10/13, B2IOHIO330 

8210220006 Forward* application to amend Licao* DPrt-Bt, request Ing Tech 
Spec change to ertend 1 insp intarval applicable- to two 
inacoiilble hijdfaulii: nubb*r 

BRADLEY.E J Philadelphia Electric Co Ba/lO/19 DEN TOM, H Fl 
Office of Nuclear RaactOT Regulation. Director Ip 13778 219 24X 
Fiche 30-270, 02/10/19, a310BaoO06 

S210220007 Application to amend Licemo DPn~36, ch^noing Tech Spots to 

extend Imp interval applicable to turn Inaccenlble 
hydraulic snubbers CertlPlcat' of Bvc arcl 

BAUER, E , BRADl,eY,E J Philadelphia Electric Co BS/10/19 
6pp 1377S 22O H4X Fich 30-378, GS/10/ 19. B21022000t 

82102S0196 Forwards response to draft technical evaluation rept re- 
control of heavy load* Arfdl info requesfied In B20405 lelcon 
encl 

DALTROFF.SL Phlladelph la Electric Co 82/10/23 STOLZ, J F 
Operating Reactors Branch 4 45pp. I9B39 136 24X 
Fiche SO-377, B2/10/2B,Bai0280196 

B2102B019B "Structural Anftlijiit of Peach Bottom Uniti 2 b 3 Reactor 

Pre*ore Vet**l Head Drop., Shr-oud Head 1 Aisembly Drop t Bteam 
Drv*<* Aisemblg Drop Condi tiom " 

HEF)RERA,H L , HOK-O Oeneral Electric Co, 83-33 H2/OB/31 
38pp 13839, IBI B4X Fi chn- SO-277- a2/lO/S3, B2102S0196, 



B2I02BOS01 "Liftlna Devicei- fc Lifting Polnta etr.it AnaLyiU for 
Reactor Prsun Viol Head Stro-ngbacV, Steam Drgir/ 
Separator Sling ft Svc Platform to- Comply W/NUREO-OA12 for 
Peach Bottom Units 2 !. 3 " 

KONO.Y.H, Oaneral eiactrte Co NSE-SO-OSSa 82/OS/31, 31pp 
1983? 219 S4X Fiche'30~a77 J 02/10/85,0810280196 

-82102B0204 "Liftlflfl Device* & Lifting Point* etre*i Anal v *t* for Fuel 
Pool Oate LiPtino Points, Hgdraulic Teniionor Liftlno Devico 
tc Lifting Point* & Reactor Praivure Vee.set Insulation 
Removal Lifting Devico t, Insulation Lifting Point* " 
SZUMBKfjT J. Philadelpnia Electric Co, , NBEO-72-07B2. 83/07/31 
29pp 13839, 230 R4X Fich: 30-377, 82/10/39, 0210880196. 



8210030380 Forwards "Thermal Hipping Rept 0B-3 for 820818 for Tharal 
rfonltoring ftequirementsi " per App B to ETB 

W1LLEEY, W B Philadelphia Electric Co 82/09/2B IPPOLITQ, T. A 
Operating .Reactors Branch 3 Ip, IS6O1.3S8 24X 
Fich* 30-277, 62/09/20,6810050320 



82 



DOCKETED ITEMS 



Q Insptction reports, IE Bulletin* & correspondtnce 

6S1Q07O317 Forwards IE Intp Rtptt 9Q-S77/B2-20 it 80-279/82-19 on 
820816-20 & nutlet of violation 
MARTJNrT T Division of Ensinttrlno t Technical Prograns 83/09/33 

DALTRQFF.B L Ph i laddph I* Electric Co 2pp 19634 133 24X 
Ffehe 50-B77, 82/09/32, 8210070317 



6210150369 Thermal Mapping Ript 02-4 for BS0101 
Philadelphia Electric Co B2/10/08 4pp 
Fiehe 90-277.82/10/08.8210130396 



13704 27.Q 



02102EQI90 Forwards monthly operating rapts far Bipt ITBS 

CDOMEYtH J Philadelphia Electric CD 02/10/15 Dirt(tE*' 

Office. Ottlcr at Inspection and Enforcement Ip 1577J ZJ3 
FJche 50-277, SS/10/I5.8210220190 



--321007-0330 IE imp nrots 50-277/02-20 h go-27&/8e-i9 on 

None a rap lie-nee nnteJ no notification given -for abnormal 
dfegridation In primary containment, tvidenced by uneccip talili 
local tiak rati tot resulti for nine isolation valves 
PIXLAMIrB V , BETTENHAUSENiL Civilian at noln*iring b Technical 
Programs. 92/09/14 7pp, 1563*. 133 24X Fl the- 50-277. &2/09/S2, 
B210Q70317 



8210070294 ForuariSl IE fnp Ript 50-270/91-23 on 811013-15 
MARTIN, t T Division of Engi-niiring t Technical Programs 

DALTROFF.S L Pfi i ladelptii* Electric Co Spp 15634-2Ifl 
Flch* 90-278,92/09/34. B210070296 



92/09/24 
24X 



9210070308 IE Tmp Rpt 30-278/81-28 on 811013-19 Noncosip 1 ianct not id 
Pailurt to follow radiation protection procedure ft promptly 
notify NRC In atcordanct u/lOCFRSO 72 

NIKITE.R L , SREEMMANiE 0. Division of Englntrrfng ti Tichnlcal 
Proj ram*. 93/07/26 10pp I5&34 320 24X Fith* 30-E73. B2/09/S4. 
BB10O70296 

6210130299 Faruardi IE Imp R*pti 50-277/aa-t9 *. &0-27Q/S2-IB on 
920007-0719 lit noneompltinc* rated 

&TARCI8TECKI.R, Division of Pro jut I t. fluidtnt fragrant BSfOt/S?. 
DALTRDFF-S L Philadvlphla Eltctrlc Co 2pp 19707 234 24X 
Fich: 50-877, aa/09/S7, 8BI0150279 

0210150302 IE Imp Rpti SO-277/0B-19 i 50-278/82- IB on 0EOB07-0913 No 

nancomplianc* notd Major artai inijitclnf, operational 

laf itifi rad 1 ition t rotactionj physlol ncurltiji control room 

actlvlbln It IE bullitln -fcllouup 

BLOU-IH, A R. , HCCANE, E C, Diviilon of Prajact !c R*ildint Pragrarai 

S2/07/20 19pp 19707236 24XF(cht SO-B77, 92/09/a7.fl2i 0150399 

6208190233 IE Info Notice QO-3S, Suppl I, "Laaklng ti DUlodj*J 1-129 
Implant Ond-i," Bvc Hit incl. 

COSB.L I Diviilon of Full FjclHtUt. Mat trial I h SafaguaTds 
82/IO/O4 ContoliJatid Edlion Co of Niu York 46pp 19761 290 

24X Flchi-90-OOOi02/10VO&. 8200190233 

821O1302?! Act rcctipt of 020929 Itr informing URC of (tips takan to 
cornet vlolatiani not*d In IE Imp Rpti SO-277/B2-14 I. 
90-27B/B3-14- 

STAFIOSTECKIrR Diviiiotl at Projrct & fltildant Programs B2/ F 10/0&. 
DALTROFF.SL Phi ladtlphia El ictrle Co, 1 p. 1 S&79 317 84 K 
Fleh: 50-2774 B2/1O/04, 0210133291 

a21013O29& Rtspondi to NRC 820901 Itr TI violation* noted In IE Into 

Rapt* 50-277/82-H (. 30-270/03-14 Corrctlv actions 

dtttctiv* locking .ntcharUiin rplac*d i ptrsonnl Initructid 

to b mare farcaful uhin checking locktd doori, 

DALTflOFF. 8 L. Philadelphia EUctrit to 82/07/3. STAflOSTECKI, R, 

Division if Projitt t Retlrftnt Programi, 2pf 19o7fl 34H 34)1 
Fich. 80-277, 82/10/06, 8210130291. 

6300190238 IE BjlUtin Q2-03. "Strtsi Corroiion Cracking In Thlct;- 
WaIlrL*rji-Di amtttr. Statnltii Btnlr Rc irculatlon 9(/t 
Piping at BHS Plant I " Bvt lUt ncl, 

DEYOUNO,R.C Director's Offlcti OfPIci of Inapictlon and 
EnfoTctmint. 82/10/14 Coniol idattd Edison Go. of Mini York 

I19pp I SB 10- [25 24X F(ih. SO-DOO, B2/ 10/14. B20B17023S 

3Z1022000& Forward! application to am.nd Licima DFfl-SSi riqut Ing Tich 
8pic chang* to iiittnd Imp inttrval appllctbl* to tuo 
inaq<t*iib li hydraulic tnutibart. 

BRADLEV,E.J. PhiladilphU Elctric Co BZ/tO/19 DENTON.H R. 
Qttit* at Hue liar Rtactor flieuUtioni DJTietor Ip, 13779:819, 9'X 
Flchi. 90-27B, 82/10/19,9210220006, 

--82I0320007 Application to anind Llcim* WR-36, chang inj Tich Spacs to 
iitind imp Intarval appliobli to tuo inaccmlbl t 
hydraulic inubbart, CirtllJcti of Bvc incl, 

BAUER, E. , BRADLEr.EJ Ph 1 ladllphia El ictric Co, 02/10/19, 
&pp. 13779:220. 24K Flchi.SO-a7B, B8/10/ 19, B210220006. 

R Periodic ptrating rtporti 1 rtUtid corritpondenc* 

B21019039& FoTU.rdt Thirnal Happing Rtpt B2-4 Pop 82090? for th*rl 
man i tor ing rtquirenantt, per App B to ETB 

HILLSEy.H B, Philadtlphla Elictrlc Co BS/IO/OB. IPPOLlTDj r A 
Operating R*aetort Branch 3. In 13704:277. 24 X 
Ficht. 90-277. 82/10/03,8210180396. 



S210220194 Monthly opirating rapts for Sipt 1903 

ALDEN.W ft Philadelphia Electric Co 02/10/13 IDaa 
24X Ficha 30-277, B3/IO/19, B210220190 



S Riportable occurrincn, LERt & relatsd corrt ipandmu 



S3 10 070474 Diicuins 810225 manual icram of rtactor *Mir 
FHR relai) logic A ilgnil Initiated ilmultanioui clgivri 
uf both recirculltion pump dlichargi valvai All bltlirv 
ground tracing should bt dani u/oh/nitir u/o fum 
A6HE.F Dlraitor's Offici 81/04/17 Dlnctar'i H/f 

15444 351 24X Fich 90-27B, 81 /04/17, B210070474 



S21001000B Rlpondl to FQIA rciiuist for 19 cmtt-gorili ol Jcm.lt'* 1 ' 
nuclear rtactor ivtnti ti iafitv problfmi Foruirdl docuiitnti 
llitid In App A 

FE4.TON. J H Division of Rulis and Records B3/Qt>/30 I/MIL ** 
Critic*! hUti Energy Project 15pp 15727 003 24i 
Flchi 90-000, 02/06/2B,821001000S 



0210050023 Discusses 810229 * Imul taneous cloiuri of rttlii*!* 1 
dlschargi valves Event occurred uihlls station (inn-fnrl rt* 
attimpting to rimove ground assoclatiil u/A dlv nl iai-vtt 
dc iiJb(jilem 

ASHE.F Director's Offlci Bl/04/17 Dlrictor'i QtHtf 

15729 039 34X Fichf 90-000,02/06/28,0210010000 



8210060017 LEfl 0a-019/03L-0, on 020B22, druwi 1 1 pniuri rtlerli 
failed dounscale Caugid bg blown fusi Fust riplictd I 1*1 
optratlon varifl*d 

COOMEV.K J Philadelphia Elictrlc Co 02/09/31 HAUJE9 * 
Region 1, Qtticf of Director Ip 19619 QB! Hi. 
FlchB, 90-278. fla/09/81, 021 00600 17 



B210I3022A LEH Q2-017/03L-0 on 020902, during huvij rtlnilgi*, tpi 
uburved that vtnt stack flour recorder Indicatitf dou-nmli 
on both channels Catifid bij pilot tube* filling w/uitt-r 
during tevar* itorm Indication returned yh*n ilur* tuttUfl 
COONEY.H, J PnlladilpMa Electric Co B2/10/01 
Region 1, DffUi of Dlnctor Ip IS679 009 
Flch:BC-27B. 08/10/01,0210130226 



DOCKET 90-2BO 8UBHY POWER 0TATION, UNIT I 

F Bfcuritv, midical, emergencv t< fire protection plint 



Q210010156 Act recilpt of B20020 responstt re mrgfnttf f 
dif iciBtvcy Items per 020406 confirmation of action Itr 
Corrective action & plant ulll be eianlned during 
sub ivquent insps 

LEMIB-R.C. Division of Project *. Risldint Prograi 
LEASBUflO, R H Virginia Elictric ti Fouir Co Ip- KM] If! 
Flcha 50-200,02/09/10,9210010196 



0210010129 Forwards revised security training d quill fit U p.r 
Plan* withheld, 

LEASBUnO, R H Virginia Electric t* Pouir Co OH/Of/17 M**' 
Office of Nuclear Riactor Regulation, Director, VMOa.B * 
Operating Reactors Branch 1 Ip 19966'013 34 X 
Fi che -30-000, 83/09/17,8210010129 



8210030076 Submits correction to B20628 Revision 3 to ruia-n 
NUSEO-0737, Item 1.0,2, "Safetu Parameter DllpUu G^i " 
Correction ihould be Included In tchedular eiciptloni 
pertaining to imirgencu nsponte capabilltle* 
LEASHUflO, R. H, Virginia Electric h Pouer Co. 03/07/M WV 
OP*Ic> of Nuclear Reactor Regulation, Director. ElKhlfJT.&l 
[Hvlijon of Licentlng Ip, 13603:109 24X Fteht -*! 

aa 1005 0074. 



9210210050 Rtleatu public version of changes to minim* 
Imp lamenting procedure 

FELTON, J M Division of Rulee and Records. 03/WiW 
Mngtmtnt Branch Ip. 13774' 109. 24X Flehe. DO-OBO. 
9210210090. 



DOCKETED ITEMS 



83 



--B21O21CQ53 Foruiarils public version of Change 1 to Emergency Plan 
]P Jxnentin j procedure EPIP-4 II, "Folloiuup OffsitB Release 
Anenmenti " Change 3 to emergency plan re NUREO-0654 
cross-ref 6 Change 3 modifying Table 5 1 

DEWANDEL, E_ P Virginia Electric t- Pouier Co 02/09/17 NRC - No 

Detailed Affiliation Given lp 15774 110 21X 
Fiehe 50-aeo. aS/09/2?. B2102IQ05O 

--83I02JQOS5 Public version of Change 1 to Emergency Plan Implementing 
Procedure EPIP-4 11. "FollOLiup Offijte Release Assessment " 
Virainia Electric 4 Power Co 82/09/17 Spp 1 8774 111 SAX 
Fiche 50-280.62/09/29,0210210050 

021021005B Public version of Chang BE 3 t 3 to emergency plan re 
NUflEG-OfaSfl cross-raf t, Table 5 1, "Mm Shift Manning 
Requ I renent i, " respectively 

Virginia Electric (. Pouir Co 02/09/17 IQpp 15774 113 24X 
Fithe 50-2BO, ea/09/39, 02102100SO 



Operating license stage document! & correspondence 



32102B0013 Responds to FOIA request for all i nternal , non-publ ic 
documents, memo*, evaluation repts t> other matl dealing w/ 
nuclear plant operations Forwards documents lilted in App A, 
FELTED, J M Division of Rules and Records 03/09/17 MCtNNlS-D 
Neui t Observer Spp 15B60 065 SAX Fiche 90-000,82/09/17, 
B21 02300 1 3 

32003)0034 Forward* draft Info notice re deficiencies in *ir filtration 
b ventilation tilt Notice based on radioactive resin release 
at Pilgrim 1 & On four related events at other planti 
involving rfefic tencies in maint It testing of filter iu,i 
WiTTEDN, R J Division of Bys temt Integration (post 811005) 
Sa/OayOS JORDAN-EL Division of Engineering d Quality 
Assurance Spp 15B6! 034 24X Ficha 50-000.92/09/17,0210280013 

J3IOIS0265 Informs of implementation status of NUREO-0737. Item II D S, 
'Plant EJileld ing" per NHC 020517 requeit All required HOT* 
Completed 

LE/vSQURO,R H Virginia Electric (. Pouer Co 03/10/01 BENTQN, H R 
Office of Nuclear Reactor Regulation. Director EIBENHUT.D 
Division of Licensing 2pp 15651 230 24X Fiche 50-000. 02/10/01, 
BS1O1 20265 



Forwards errata to Topical Rept VEP-FRD-33, "VEPCO. Reactor 
Core Thermal-Hydraulic Analysis Using COBRA IIIe/MIT 
Computer Coda " 

LEASBUnO.R H Virginia Electric tt Power Co B2/IO/04 DENTONj H R 
Office of Nuclear Reactor Regulation. Director EI8ENHUT,DO 
Division of Hcn*ing 2pp 15652 330 24X Fiche 80-000.02/10/04, 
62(0120297 

-6210120305 Errata to "VEPCO Reactor Care Thermal Hydraulic Analysis 
Uiing CDEfJtA-irie/MIT Computer Code " 

* Virginia Electric (c Power Co VEP-FRD-33 ERR 82/10/04 lp 
15632 333 24X Fiche 30-000,03/10/04.0210180297 

310120110 Forwards payment of requisite technical revieu fee* for 
Internee map l< testing program 

LEASHURO. R H Virginia Electric & Pouer Co S3/10/O5 DENTONi H R 
Offlte of Nuclxar Reactor Regulation, Director VAHOA, 8, A 
Derating Reactors Branch I lp 19651 830 24X 
FitJie 50-2BO. 92/10/03.0210120110 



92IOS2017O ForuB-rd* corrected drauing r* 1 1/3-inch drain valve 
-hS-74 Vilvt Incorrectly Ijbtlid 1-K3-SOB in B309i5 1 fcr 
LErtSBUHO. R H Vlrqini* Electric b Power CD, 82/10/16 DENTON, H R 
Office of Nuclear Reactor Regulation. Director VAROA, B A 
dpBratlttg Reacto-ri Branch 1. Spp 1 977H 043 24X 

FUh* 50-280, B2/10/IB, 6210220170 

821O22-017S Comments on avaluation of lignificant dynamic load* in 
determining rapacity of ilings used * &r NUnEfl-O&lS Rating 
can ba iaf*lu .jprmad in term* of m*i static load 

LEASBURO, R H Virginia Electric & Power Co 93/10/18 DENTDN, H ft 
Office of Nuclear Reactor Regulation, Director ErBENHUTj & 0. 
Division of Licensing 2np 1 5777 293, 34X fMch* 9O-OOO, H2/ 10/18, 
0210220179 

B2102QOHit Informs that containmBtit purge valve qualification program 
for 36- inch c attainment purge valve* completed To ensure 
prevention of radloaictJve rel em* e, flntii automatic isolation 
valve yill b> installed 

LEA6BUR&, R H Virginia Electric d Pouj.r Co BH/ 10/25 DEM TOM, H n 
Office of Nuclear Reactor Regulation,, Director VAfJOA, S A 
Operating Reactors Branch 1 Spp 1 5SG7 316 B4X 
FlcM 50-2SO, G2/10/23, B210280266 

021O2S013O Informi that review of neeJ -fuel co-ntainar lifting rig 
completed Rig da*s not comply u/Parag raph 3 2 I 1 of 
ANSI N14 6-197B Proposed design mod for conformance being 
reviewed !< will be implemented by 940323 

LEASBURG.R H Virginia Electric fc Pouer Co 92/10/20 DENT ON, H Ft 
Office of Nuclear Reactor Sngulation. Birec tor EISENHUTiD C 
Division of Licensing lp 15B37 1&3 24X Fiche 30-2BQ. B2/ 10/33. 
9210230130 

Inspection reports. IE Dulletln* b c orreip onjftc 

Q2100B0015 Addl response to FDIA requent for 19 categories of info re 
nuclear reactor events & safety problems Forwards document* 
listed in App A Document* fn App 19 completely ulthhvld (ref 
FOIA Exemption St 

FELTON, J rl Division of FHiles and Recorda 82/O7/1B UDELL, n, A 
Critical K*ss Energy Project 9pp J56A5 O27 S4X 
Fiche 30-000,02^07/12,8210000019- 

0aiO000154 Sytep)>tlc a**e**ment of liceniee performance note-a re 
facility evaluation for May 1 97'7-Apr 19BO 
4 NRC -Ho Detailed 1 Affiliation Qlven 80/O1/GO 6pp, 
1SA60-O51 24X Flche'50-OOO, B2/07/ la, 821 OOBO019 

5209340421 Act receipt of util S20607 1 tr l< paumvnt of civil penalty 
Dated on reviviu of inc lden.ti.no. baits for remission or 
mitigation of penalty Identified 

LIGBERMAN-J Enforcement Staff B2/O7/39 LEAaSUHO. n H Vtt-flinia 
Electric ti Pouer Co 3pp 19974 313 31 X Fichu 90-2BO, BS/07/St, 
8208260124 

8706160306 Respond* to NRC 8203 10 Itr re violation* nattt In IE Inap 
Rpt DO-2BO/B2-58 Corrective action* ore* tar tup chvckllit 
lull! be per farcied by initrument supervl*or & all employee* 
counseled re procedural compliance 

LEA0BURG,R H Virginia Electric h Pouier Co B.2/0&/O9 
DEYOUND.R.C Director's Office. Office af Inspection and 
Enforcement 4p|i 15574 aii 24-X Fiche SO-aBO. B2/07/a9i 
82OB2&O494 



2JO12023B Foruards payment of requisite technical revieu fees for 
relief renusts f' ola requirements of ABME Section XI 
LEASBURQ. R H Virginia Electric tt Poyer Co B2/10/05 DENTDNf H R 
Office of Wuclei- Reactor Regulation. Director VAfiQA, S A 
Operating Reactor* Branch 1 lp 19632210 24X 
Ffclie 30-aSOi 82/10/05.0210120353 

SID200Q43 Application for amend to Licenses DPR-38 b DPR -37 consisting 
o* proposed changes to Tech Spec* modifylnfl reporting & 
notification requirements 

4-EASBUROrfl H vifBinia Electric *. Pouer Co 02/10/06 DENT ON. H R 
Otfitm of Nuclear Reactor Regulation, Director VAROAr S A 
Operating Reactor* Branch 1. 3pp I5737'2a3 24X 
rich* 30-280, 02/10/06,8210200043 



-8210200046 Proposed changes to Tech Specs modifying reporting tt 
notification requirements 

Virginia Electric d Pouer Co 02/10/Oi Spp 15787 S2B 
Fit JIB 50-2SO. BZ/10/06, 0210200043 



24X 



2I027O29B Ac k receipt of B20919 application requestlnj relief from 
certain post-repair tst requirements of ASME codt Class III 
fee requested since review involves consideration of tingle 
safety i" 

OlOOSjft H Licenee Fee Management Branch B2/10/19 LEA8BURO, R H, 
Virginia Electric b Pouer Co lp 19636-329 S4X 
F(ch 30-280, 82/10/13.B21027029B 



aaiooioaas Foruard* IE insp R* P t* so-aao/B2-o4 t< g 

BSOI29-02S&. Enforcement action *nb separately an QSOBIO 
O'REILLY.J.P flsoion 2, Office, of Director- 82/03/13 
LEASBURO.R, H. Virginia Electric b Pouar CD. Spp 13574, 32O, 
Fiche 90-2BO, 82/07/29, B20a2e>0424. 



24 X 



0210010343 IE InP Bept* 90-850/82-04 t> 90-aHl/B2-O4 on B201K3-02H6 
Noncompllance noted failure to maintain operabill ty af iteam 
flow instrumentation *< to folloui QA manual ii procedure* for 
documenting Inoperable steam Cloy tni trumentation. 

BURKE, D J , DAVIB.M J . DANCE rH C Division of Project I. fleaident 
Proorams. aa/04/09- 9pp. 19374.382 24X Fiche 30-SBOr 82/07/39- 
B20B2&0424. 

B210O70007 Respond* to FOIA request; for eight categories uf records re 
steam genirator* ti iteam turbine*. App A documents provided 
in R Ude.Il FOIA Request 81-313 Forward* documents licted In 
Anp B 

FEUTON,J M Division of Rule* and .Records.. B2/08/1O. LONO^ D J 
MlDthrop r Stlntom Putnam i Robert* 9pp. 1S64S.O43 34 X 
Fihe. 80-000. 82/08/10,8210070007. 

8210070139 Forward* tabulated data on iteam generator imp & maint at 
facilities Data should bi provided to licaniei* 
IPPOLITD, T, Operating Reactor* Aie*sment Branch. B2/04/OL 
VAROA, 8 Operating Reactor*. Branch 1 9pp. 15649 131 34X 
Fiehe;SO-000,aa/08/10, 8210070007. 



84 



DOCKETED ITEMS 



8210070173 Forwards info re itean generator Integrity i Inipi at all 
operating PWR*,p*r 730320 k 21 requeitl Detail) of inipi, 
including defect indita ttanti tub* plugging criteria b tube* 
plugged ui I 1 not be provided ectpt -for Point Beach I 
ODLLR,R R Diviilon of Reactor Litensinc INEIR-1979 only) 
73/031*34 MflCCWIYiR R Divillon of Technical Revltui (NHR-1975 
only) 5pfl 1S64S IfA S4X Fiche 50-000,62/09/10,5210070007 



8210150139 LER 91-Q29/Q3L-0 on 810808. uih i le at 100V pouir, i ndiv idui 
rod poeition indicator for rod F 12 indicated erratu*Hgi fc 
IS ttepi !* than bank demand position Cauted by poor 
electrical connection between coil 1 1 1 gna I module 
HILGQN, J L Virginia Electric Si Power Co 0I/QS/3B flifign I 

Philadelphia, Office of the Director (B1/03/OII app 13698 3C9 
24X Flcn 50-280.91/09/28,0210150139 



9310010156 Ack receipt of 920020 retpon*ei r emergency prepareiineis 
deficiency itro* p tr 820*06 con f Irroat 1 on of action 1 tr 
Corrective action b plant will an am mint [I during 
lublenJent inpt 

LEWlff.R C Civilian of Project t Ruidint Program* BS/09/10 
LEHSBUSO.R H Virginia Electric & Poutr Co lp 15SA5 325 34X 
Flthe 50-260, B2/09/1O, 62100101 So 

0310130427 Faru*r<S "Imervic* Inp Pron.ram, 1 nterval 3^ B 2 1 222-9 2 1 323 " 
R*!ief re^ueited from ASME Cpde.Siction XI teiting & imp 
r-nuiremt n t 

LEA3BURO.R H Virgin!* Electric 1 Pouer CD B2/09/21 DENTDN.H R 
Dffce of Muclear Ructor Regulation. Director EISENHUT.D 
Oiviilon oP Llctntjng lp 13677 152 24 X Fiche 30-3BO, B2/09/2I , 
8210130427 

--321013043k "Iniervico Imp Prognm, Interval S. 621323-921582 " 

Virginia Electric fc Poutr Co S2/09/SI 432pp 13iT? 193 
24X Fichs: 30-280, 32/09/21,0210130487 



B2I02702IS Formard* LERs 01-069/03L. 01-073/03L-0 t, ei-072/O3L~0 
WIL30H.vJ L tfirginia Electric J. Pouitr Co 01/12/07 D'REIH- f J 
Region 5, Atlanta, Office of the Director (Bl/03/01) |p 
15B27 04? 24X Ficha 3O-S00. Bl /12/07, 8210270312 

B210270215 LER B1-069/03L-0 on 91 1 1 15, d iscovered lou of ilau Ur 
BK-OV'1O1 tt 103 procaii vent monitor* Cauied by radiation 
monitor lampli pump circuit breaker tripping Came nut 
dotrmined Breaker nsat fc pump started 

WILSON, J L Virginia Electric b Pouior Co Bl/12/07 Kif.ti 

ftllanta. Of fie* of the Director (81/O3/01) 3pp 1&O37 041 
Fitfte 30-280,81/12/07,0210270212 



B310270E2O LER B1-073/03L-0 on 91 1 10S, motor aperated valv* 
to open uihan operated from control room during tetting 
Cauta undttermlned Valve opened normallg uhen testd later 
HILSOM.J L Virginia Electric (. Power Co 01/13/07 P*ij 

Atlanta, Office of tha Director (01/O3/011 2pp 19Q37 O'A 
Fiche 50-B00,ai/ia/07,B3l0270ai3 



&2L02S03-31 FOTUartfl IE Intp Rept* 50-2SO/B3-2S t 30-291/02-35 on 
B20830-0903 No noncorap I lane* notied 

DfiNCE.H C Oiviiion of Project tc Ratidinl Programi 82/10/04 
LEASJJUHO.R H Virginia Electric & Poutr Co 3pp 13774 375. 34X 
Ficlie 50-280, 02/10/04. B210S20331 

BE 10220356 IE Imp Rpt* SO-2SO/BB-2S S< 50-231/82-25 on 820930-0903 No 
noncotnp 1 i anc* noted M*jor araae inipectvd FollouiUp on 
fTfviaut nforcemant mat tin & unTi*olv*iI Itimt tt follouup 
an unplanned rcleaie of gateoui Tad ioecti vltij 
HOSEV.C , BARR.H P Divlilan of Enginierlng E> TtcJinlcal 
Program* 92/09/3O lOpp 15776 277 4X Fiche:5O-BBO.BB/10/O4, 
8210290331. 

6210120110 Foruardt paijnint of requisite technical reviiu feai For 
IniirvlcF imp b tEiting praerarn 

LEA3BURO, R H Virginia Electric fc Pouer Co B2/10/09 DEKTON, H tt 
Office if Nuclear Raattor Regulation, Director VAFOA, S A 
Oparatfng Reactori Branch 1 tp 15*51 290 34X 
Fich 50-290,92/10/03,8310120110 



-9210270324 LEF1 B1-073/03L-0 on 01 1 108, i tolat ion valve to redrtul, 
Ipray HX A failed to close Cause undetermined Valve operated 
normally later Limit *ultch I> torque tattings eiamknad B, 
found catl ifottonj 

WIL80H, J L Virginia Electric Si Power Co SI/12/07 fttiiti 

Atlanta, Office of the Director (SI/03/01) 2pp 19027 049 , 
Ftch 50-380, Bl/12/07, 3310270213 



8210050103 Foruardi LER 93-OH4/03L-0 

WILSON, J L Viroinifl Electric & Power Co 03/07/34 
fl*9ion 2r Office of Director lp 15603 392 34X 
Flche 50-280,83/09/34,8210050103 



6310050109 LER fl2-OBt,/03L-0 on B30087, radia tion monitor FlH-LU-i: 
Indicated 9 OE4 CPU u/o annunciation of alarm Cauitrf kif 
defective puih button b setpqint djrlft Puen button replallf 
ti nc-nitor rec*)ibr 

H1L.SOH.J L Viroinia Electric Power Co 82/09/24 Rigii 

Of fie. of Director 2pf> 13603 393 24X FichB 50-200, 02/09; 
6210050103 



920Q19-0233 IE Info Notice 90-39, Suppt 1, "Leading 1> DUlodged 1-129 
Implant Sitdi " Sve lit encl. 

COBB,L, I Qiviiion of Fuel Faceiitiai, Hatertalt & Safeguard^ 
03/10/Oj, Ganiolidated Ed i tan Co of MeUJ York iipp, 19741 250 

24X FichB 50-000, B2/10-/06, B30B190233 

Q20B19023B IE Bulletin 32-03, "3tn*i Corrosion Cracking in Thick- 
Hall, Laruf-Di mutter ,St*Jnl tn Steel. Reclrcu 1 ation BUI 
Piping at BUR Planti " Bvt Hit end 

DEYOUNO.ft C Director'! Dffic, Office of Tnepectlon and 
Enforcement. 93/10/14 Conolld*td Ediion Co of Niu Yort, 

HSpp. 15810 125. R4X Fich* 80-000,82/10/14,8203190333 



&21003007J Foruardl LEII 82-003/03L-0 (< updated LEfi 02-034/01 S-l 
HJLSONrJ L Virjinia Electric b Pouer Co 82/09/27 CPflFH-Li 
fi.flion S, Office of Director lp, 1 3603 175 24X 
Fiih 30-280, a2/09/27,B21005007l 



-B210050074 tER ea-083/03L-0 on 030831, performance of PT-UTE TI.I 
that amp reading -for heat tracing panel 9i circuit 2H.uii 
beloiii acceptance criteria Caused bij eicelilve h*at llsat 
tracing replaced '* teitid 

WILSON, J L Virginia Electric !< Pouir Co 02/09/27 IML' 

Offic* of Director 2pp 15603 176 24X Flch* 50-360. 
B3100S0071 



S. RpdTt*hle o ccumncaai 1_ERi It related correspondence 

3210150093 LEft 81-022/03L-0 on B10703, low floy alarm obitrved for 
procn v*nt tijt Cauead bij proceii- blauiir mo tort out of ivc 
du> to valve l-CM-2.1 leaking through to y-nt piping during 
attempt to drain nixvd betf daminerali ler 1A for rein flit 
WILSON, J L. Vlrglnl* Elictric tt Pouer Co 81/07/31 Res [on S, 

ctor 3pp 15701 192 24JC Flche 50-890,81/07/31. 



-8210030078 Updated LER 83-OB4/Q1X-I on Q20B08. venting lit A 
pump retulted in max initantanooui releaie rate btltrg 
eice-vded Cauied bij failure to change radiation monitor 
tetpolnt alarmi to reflect neu vent tgi flow rat*( 
WILSQH, L Virginia EUctrit & Pouer Co, 82/09/27 
Office of Dirictor Spp 15603 178 34X Fichg 5O-3DO, 
6210000071 



321005009) Foruardi LERi B2-093/03L-0, 03-054/03L-0 t 133-092/0-X-3 
WILSOH.J L Virginia Electric & Pou.r Co 83/09/27 O'REILLY. 
Riglnn 2. Office of Director lp 15604 344, 34X 
Fich*. 50-890. 93/09/37,8210050081. 



eaioosooat, LER sa-cra/osi-o an 820904, at loox pomn-*ir tint i' 

ffl*r}enc-y dieiel ganerator 1 found u/lneuff icient air 
pr>-ieure to itart generator Cauied bi| failure to reitl lecil 
low air prenur* Bottle* filled to 200 pit 

WILBOHrJL Virginia Electric b Pouivr Co 82/09/27 Rip' 

Office of Direct-or 2np IS 604 249, 84 K Fithe, 90-afl0 1 BJ/W' 

eaioosooai 



92100B0091 LER B3-054/03L-0 on 830905, unattended portablt (. 
to clean wattrbox C iiuung around fr flooded ivc u-afcer pit 
containing ivc water Valve MOV~SW-203B grounded In opan 
petition Cauid bg operator error MPV-BW-S02B dried 
WILSON- JL, Virginia Electric t< Power Co 02/09/27 
Office of Director 3pp 1B604 247 24X Ficht aO-SBO.e 
0210050061. 



DOCKETED ITEMS 



--B31Q050092 LER B2-092/03L-0 on 820905, at full power, DPI F-9 observed 
fluctuating up to 13 steps Caused bij enposure of containment 
ilde electrical panetraiion to eicesBive moisture & faulty 
signal Steam leak repaired 

WILSON, J L Virginia Electric J" Power Co 02/09/27 Region S, 

Office c-f Director Spp 13604 350 34X Flche 50-380,83/09/27. 



S210220413 LER S2-099/03L-0 an 880920, radiation monitoi-* RJ-OH-1O1 t 
102.VQ-1Q3 4 104 & RM-LW-IOB lost power for 1C minutes 
Caused bij blown supply fus due to Inadvertent hortinj of 
control relag ' ground Fuse replaced 

WILSON. J L Virginia Electric & Powar Co B2/IO/O3 Region S, 

Office of Dincior 2pp 1577? 218 H4X Ficne 90-200,33/10/09. 
8210320392 



621O06O361 Forwards LERa 8S-OB7/03L-0 t. 02-057/03L-O 

HfLSDH. J L Virginia Electric & Power Co B3/09/30 O'HEILLV, J P 
ftegion S, Office of Director lp 15619 006 24X 
.Fichu- 50-280,82/09/30,6210060361 

B31Q06Q372 LER 82-OB7/O3L-0 on B20901 fc 20, pump t-SW-P-lOA aiperienroil 
loss of sucliun power li on 830901,14 fc 20, pump 1-SW-P-IOA 

insufficient NPSH Svc water replaced Svc water pumps vented 
WILSON, J L Virginia Electric & Powor Co 82/O9/30 Region B. 

Office of Director 3pp 15619007 34X Fiche 50-200. B2/O9/30, 
32IO06O361 



B210290267 Part 21 deficiencg rep t re potential galling problem between 
stem & bonnet of 1 25-inch b larger A1O5 carbon steel I. 
A182-F22 valves supplied Feb 1981-Auo 1932 Valves should be 
serviced b item ti/or bonnet replaced 

ISABELLE.L D Convfll, Inc B2/1O/11 HAYNE8. B C Raglan 1, Office 
of Director 17pp I5B54 232 31 X Fiche 50-003,82/10/11, 
03 10270267 



8210220099 Forward* LERs 82-098/03L-0 tt B2-OS3/03L-0 
UILSONiJ L Virginia Electric J. Power Co 82/1O/14 
Region 2. Office of Director lp 13773 177 24X 
Fiche 50-BBO, H2/10/14. B210220095 



Q'HEILLY, J P 



-B210060393 LER 92-Q57/03L-O on B209O1 , 13, IB & 30, pump 2-BW-P-1QA 
eiperienced loss of suction pressure ( on 830913 & 14, pump 
2-SW-P-1OB eiperlenced similar loss of suction Caused bij 
insufficient NPSH Sue mater reduced Svc water pump vented 
WILSON, J L Virginia Electric ( Power Co B2/O9/30 Region 2, 

Office of Director 3pp 15619 O1O 24X Fiche SO-2BO, B2/O9/GO, 
ea- 10060361 



--B310220097 LER B2-099/03L-0 on S30919, 1 io.ui d waste monitor RM-LW-10B 
alarm setpoint eiceeiled Tech Spaci limit during pprformance 
of PT-26 1 Caused b(j defective log rate board. Defec tivt 
parti replaced 1 meter calibr 

WILSON, J L Virginia Electric l< Power Co 82/10/14 Raglan 3, 

Office of Director 2pp 15779 178 24X Fichu 50-280, B2/ 10/14, 
8210330095 



21013020-1 Forwards LEHa 82-OS5/O3L-0, B2-O96/03L-0 t B2-095/03L-Q 
UltSOIJ. J L Virginia Electric '. Poucr Co 82/10/04 O'REILLY.J P 
fieijion 3, Office of Director lp I567S 29B 21X 
Fittif 50-230.83/10/04,0210130204 

-B210130208 LER B3-055/03L-0 on B20906, charg ing pump auxiliary oil pump 
A tripped loading to tripping of replacement pump/motor 
Auiiliarg pump failure caused bi( open winding in motor 
Rep iac-ement tripping caused bi| undersneil thermal overloads 
USLSDN.J L Virginia Electric fr Power Co B2/1Q/O4 Region 2, 

Office of Director 3pp 15673 259 21 X Fiche 50-2BO. B2/ 1 0/04, 
B210I3O3O4 



B210220100 LER B3-033/03L-0 on 820914 , pomp 2-8U-P-10A lost auction 
pressure Caused tg Inauf fie lent NPSH due to throttled ivc 
mater Eo air conditioning Chilian Pump vented to restore 
NPSH 

WILSON, J L Virginia Electric b Power Co, B2/10/14 Region 9, 

Office of Director 3pp 1377H ISO 24X Fiche 30-290,82/10/14. 
B210220095 

8210270264 Forwards LERs 8S-100/03L-0, BH-1O2/03L-O t> 0B-103/03L-0 
WILSaN-J L Virginia Electric b Pouier Co 32/10/32 O'REILLY.J P 
Region 2, Office of Director lp 1 3B53 1SB 24X 
FichB 50-2BO, 02/10/22, 821029026-1 



-d2101302l3 LER B2-096/03L-0 an B20916, w/unl t at 99H power.PT-37C 
r-e/ealed that amp readings for heat tracing Panel 9, circuit 

1*7. mas belou acceptance criteria Caused bij eicessive heat 
Defective- heat tracing replaced (' tested 

WCLSON, J L Virginia Electric 6 Poiuer Co 82/10/04 Region I 

Offbce of Director 2pp 1967S 361 34 K Fiche 50-3BO, B3/ 1 0/04i 
B210I3O204 



-8210390270 LER BB-100/03L-0 on 820922, pump 1-BWP-10B bacamr all-bound 
during U>B of air to clear sensing linss to uiater itrainert 
In delta P gaugit Cautad by injecting air into svc uater 
lines upstream of pump Personnel re initruc ted 

WILSON, J L Virginia Electric ( P truer Co 03/10/22 Re-gion 2, 

Office of Director 3pp 15893 129, 24X Flche 90-280,93/10/32, 
8210290364 



-B21Q1302I6 LER a2-095/O3L-0 on B2091 1 , w/unl t at full power, steam 
generator C level indicntian LI-1-495 drifted high Caused by 
bodg-bonnet leak on transmitter ref leg root valve Repairs 
mil t> performed during ncit outage 

HILSON, J L Virginia Electric It Power Co B2/IO/04 Region 2, 

Office of Director 2pp 15679 363 JMX Fiche SO-2SO, 82/ 10/04i 
9210130304 



-0210290276 LER B2-102/03L-0 on B2O923, disc o versd pin attaching anubber 
1-8HP-HBB-35B to main itiam line partially out & snubbeT 
eacktd Caused undetermined Snubber stralgh tened fe pins 
properlg Installed 

UIUSDN.J L Virginia Electric h Poiuer CD B3/10/S3 Raglan 3, 

Office of Director 2pp 15853 131 24 X Flche 90-380, B2/ 10/BB, 
B3 1 0290264 



0230130SOO Fcruartfs LER B2-09I/03L-0 
IJIC.SD.-J, J L Virginia Electric (, po 
Region 2, Office of Director lp 
Fiche 50-2BO, Ba/10/01, 8210130500 



jer Co 62/10/04 
136B2 136 24 X 



O'BEILLV, J P 



8210130507 LER B2-091/03L-0 on 820905, water fc sediment found in lube 
oil Of charging pump 1-CH-P-1A Caused bij leak in one tub* of 
lube oil cooler Cooler replaced, oil changed & pump returned 
to svc 

WIL50N, J L Virginia Electric (- Pouer Co B2/10/07 Region 2, 

Office of Director 2pp 15682 1B7 34 X Fiche 5Q-CBO, B2/ 10/04, 
02 1 01 30900 



-S2102902B2 LER 83-103/03L-0 on 830927, amp readings for he.at tracing 
panel 3 circuit Z4D found btlou acceptance level Cauia 
untcnouin Defective heat tracing replaced ti devign change 
initiated 

WILSON, J L Virginia Electric t. Power Co B2/10/S2 Region 31, 

Office nf Director 2pp 13833. 133 34X Flch 9O-280, 02/ 10/23. 
8210390264, 



DOCKET 50-381 SURRY POUER STATION, UNIT 2 

F Security, medical, emergency h fire protection plans 



02102=0392 Forwards updated LER BO-019/03X-1 & LERi 82-058/03L-0 b 
S3-O99/03L-0 

WIt-BQM, J L Virninia Electric i Power Co 82/10/OH O'REILLV.J P 
Region 3, Office of Director lp 15779 312 24X 
Ficho 50-?BO. Ba/10/03, 8210320393 

a21O2303'?B Updated t-ER BQ-019/Q3X-1 on 80030-V. error discovered in vol 
of contaminated drain tanks for increasing tankage Caused by 
or rone out labeling Vols relabeled S< other tanks evaluated 
for use in liquid waste release calculations 

WILSON, J L Virginia Electric t> Power Co B2/10/OB Region 2, 

Office of Director 3pp 15779 313 24X Flche 50-3BO. B2/ 10/OB, 
BS 1 0230372 

B2IO23040S LEB 82-OSB/03L-0 on B20913, saf etu injection accumulator C 
round u/i-edueed boron concentration of 1. 924 ppm Caused b 
leakage through check valve 5-31-144 during sensitlied pipe 
Flush Flush stopped Valve to be reworked during outage 
HELSDN.J L Virginia Electric fr Pouer Co 82/1O/OB Region 2, 

Office c-f Director 2pp 15779 216 24X Fiche 90-2BO, 82/ 10/Ofl, 
B2 10220392 



B210010156 Ack receipt ot B3QB20 responsHi r* mrgeneij preparedness 
deflcitncg ittmi per 820406 confirmation of action Itr 
Corrective action It plans will be tiamined during 
subsequent imps, 

LEWIS, R C Division of Project b Resident Program B2/O7/10 
LEASBURO.fi H. Virginia Electric t. POWBF Co lp (3563 325 34X 
Fiche 50-580. 82/09/10. B210010156 



Forwards revised security training & nullification plans 
Plans uilthheld 

LEASBUflO.R.H Virginia Electric tt Pow>r Co. B3/09/17. DENTOM, H R 
Offico of Nuclear Reactor Rigulatiom Director VAHOA, B A 
Operating Reactors Branch 1 lp, 13366- t>l 3 24 X 
Fiche 90-000,02/09/17,8310010123 

B2 10030076 Submits correction tc B3O62B Reviiion 3 to reiponte to 
NUREO-0737, Item I.D 2, "Safety P*rametar Dltplay Bus. " 
Correction should be Included in *chedular exception* 
pertaining to emergencg response capabllltlei 

LEASBURO.R H. Virginia Electric fc Powar Co. H2/09/29 DENT ON, H R 
Office of Nuclear Reactor Regulation, Director, EIBEWHUT, O 
Diviiion of Licensing lp 19603 183 24 X Fleh* 5O-000, SS/09/S9, 
BS 10030076 



DOCKETED ITEMS 



831021QOSQ Rlaaii public vriion at changei to mergincy plan 
imp Itncnt i no procedure 

FELTOM, J H Division at Rulei and Record* 92/09/27 Document 

Management Branch lp 1S774 109 24X Fiche 30-200.82/09/29. 

esioatooso 

8210210033 Forward* public vnion of Change 1 to Emergency Plan 

Implimentino, Procedurt EPIP-4 11. "Follouiup Offite Fltttaie 

Aimiment. " Chin ft a 2 to rmergiiuu plan rt NUREQ-0654 

cron-ref U Chanjn 3 modifying Table 5 1 

BEHAtlDEL. P Virginia Electric i Pouer Co 83/09/17 HC - No 

Dttailed Affiliation Oivan lp I37T4 110 24X 

Fith. SO-2BO.8/0'?/29.aaiOaiOOSO 

821O21005S Public veiion at Changi 1 to Emirjencij Plan Imp 1 men ting 

Procedure EpIP-4 II. "Fullouup Qffiitt Rileate Ail mmxit " 

ViT(inia Electric S< Pouer Co 93/09/17 2pp 13774 111 24X 

, B21Q21Q050 



B21021O05B Public version of Changtt 2 t, 3 to m*rjencij pl*n re 

NUREQ-0634 cro*t-raf t. Tat.Se 5 I, "Kin Shift Manning 
Requirement*! " raapee 1 1 vly 

* Virginia Electric 1 Powar Co SB/OT/17 lOpp 15774.113 24 
Fiche. 5Q-2BQ.82/09/a'?ia2l02100SO 

P Operating licence stage document*!" corrHipotiienci 

S210-ISQ2AS Inform* of iflpln*ntation itJttui of WUREO-0737. !tm II H 2, 
"Plant Shielding" per NRC 620517 requeit All required uori 
completed 

t-EASDURO.R H Virlinia Elaetric t Pouer Co B2/10/OI BEWTON, H ft 
Office of Nuclear Roactor Regulation. Dinttnr EISENHUT.DQ 
Divilion of Licenilng Spa 1S691 230 S4X Fit hi 90-000:98/10/01, 
B21012Q265 

a2101202-?7 Foruarili srtflta to Topical Rept VEP-FRD-33. "VEPCO Reattor 
COT* Thermal-Hydraulic Anln*i Uinn CQBRA IIIe/HIT 
C<nnput*r Code " 

LEA8EURO.R H Virginia Electric b Power Co 83/10/04 DENT ON . H Ft 
Office at Nuclear Reactor regulation. Director ElESfJKUT, D Q 
Dlviiion of Licencing 2pp 13t52 330 B4X Fiehe 50-000. B2/10/04, 
92 10 120297 

S2101Z0305 Errat* to "VEPCO Reactor Core Thermal Hydraulic Analysis 

Utlnn CODflA-IIlc/MIT Computer Code " 

Vtr^tnia Electric b F 9 ouier CD VEP-FRD-33 ERR 3S/IO/01 lp 

1S652 332 S4X Flch> 90-000.62/10/04,6810120297 

8210200043 Application for antnd to Lictniti DPF-32 & DPR-37 consistlnc, 
of prepnced c hang** to Tech Gpeci modifying njnirHrij ^ 
natlficntion requlromenti. 

LEftSBCRO.R.H Virginia EUctrlc (. Pouer Co B2/JO/06 DENTOM.H R 
Office of Nuckaar Reactor FtaouUtton. Qirctar VAfiBA, S A 
Operating Rtacton Branch 1 3pp, 15757 285 E4X 
Ficht 50-230. 83/10/06.6210200043 

BE 1020004 a Ppoptd chinjut to Ttth Bptti modlfijtng reporting fc 

notification re<|utTn>nti 

* ViTgtnla Electric b Poutr Co 82/10/06 3po 15797 ?2B B^K 
FitPiB 50-260, fla/lO/06i 9210200043 

6310220178 Comment* or* evaluation of aiinificant dypiamlc Ic-adi In 
daterntnlng capacity o* illngt uuil pr NUREO-0612 Rallnc- 
can b iafttv tisirtfid In ti-rnt of m it* tic load 
LEASBURO.R H Virginia Electric . Pouer Co BE/10/1G DGHTONi H R 
Or-ftc* of MucleJir Reactor Dcgulatlom Director ElfiENHUTi D 
Diviilon of Lictoeins- Zpp 19777,293, S4X Flchl SO-OOO.B2/10/1B, 
02 10220 17B 

S2102BOaA6i In*ormi that conbticiaint ("urg valvo qualif IcabSon program 
for 36-Inch containmi-nt purga vlv cniplted To inur* 
pravantion of radioactlv* rUata,n*u automatic liolatlon 
valve will tt Initilled. 

LeASBUSO.F.K WiTjinta Eltctrit t> Poutr Co 88/10/33, DENTON^H R, 
Office of Kutlerr Raactor flijuUtlor, Director. VAROA.S A 
Qperatinu RtactOTi Branch 1 2pp 15B37.3IA, 2*X 



B21O2B013O Infarnn that Tev(u of nu ful conttn.r Uftlna rig 
cc-mpletd, Rig dttei not comply u/Parigraph 3. a 1 1 of 
ANSI H14 6-1978 PropDied ileilgn moi for cerformance btins 
revlNuid &ulll b Inplrnented bu 940323 
LEABBUROrH.H Vlfalnla EUctrlc fc Pow r Co BS/IUSS 
affle* of Nuclear Reactor R*gulatloni Dlractor, EISENHUT.D 

Lle * B * 1 '** l(l - "MMAS, S4K 



Ini-pection rfportir IE Bulletins 



B2100B0019 Addl response to FOIA requeil for it Categnrjei 
nucleaf reactor *venti ft tafttij problem* Foruiardi doiune 
lilted In App A Document* in App D complitalij uithheN i 
FQIA Eiempt ion S) 

FELTQN, J M DivUlon af Rule* and Records B2/07/|a 
Critical Man En*rjg Project 9pp 15tA5 027 34): 
Fiche 50-000, 02/07/12,031006001 S 



UMIL J 



B210Q901S4 Sy*ttmtic assesiment of licintce prf orrrmnc. not.) 
facility evaluation for Han 1979-Apr 1930 
* NRC - No Detailed Affiliation Qwn 80/04/30 hoc 
15668 OS! 24X Fiche 50-000. S2/O7/ 13. 831008001-1 



n-i''i 



B20B2&0424 AcV receipt of util B 2 0609 Itr t< pugmunt of eiu |i 
Qaiad on rvl BUI of lncldsntl.no bail* for remiiolcn or 
mitigation of pentltg ide.ntifled 

LtEBGRMAN, J Enforcement Staff 83/07/39 UAttEURD.FI H 
Electric 4 Power Co 3pp I3S74 313 24X Flch* ao EHO (J 
920BB60424 



Rion to NRC BHOStO Itr r vioUtion* nottjj In ] '- 
Rpt 50-260/83-30 Corrsctiv* actions ptustflrtop ch(k|,l 
will be p-erformsd by initrument luparvnor t nil imploum 
<;ounild ri procadui-al compliance 

LEASBHRO, R H Virginia EUctrlc t Pougr Co EIU/Oh^09 
DEVOUNO.R C Dlmctor'i Office, Offic> of IntptcUorn irt 
Enfornment 4pp 13S74 316 24X Ficlie 30-SHO. 



0210010239 FnrUHrdi IE ln*p Hop t 50-280/88-04 t, SO JIII/H3 Cl 
S20 123-0226 Enforcement action lent upai-uttlij on 
O'REtLLV.J P Region H, Office of Director 
LEA8BURO.R H Virginia Electric fc Pouir Co 
Fltha 50-230,88/07/37. Q20B260424 



Bt0010B4& IE ln*p Ropti 5O-2BQ/fl2-04 (, a 

Noncotnp 1 Iflnci noted failure to maintain optrabl 1 i ty f tim 
flow in tru mm tat Ion & to follow Oft manual b pracedurti | t > 
documenting Inoptrabli (team flow Initrumentallan 
QUHKE.D J , DAV1B.M J , DANCC.H C nivliidn of Prnirn l l 
Program B2/04/OB 9pp 13574 323 B4K Tuhi 90-.1..1 !-J. 



6210070007 Retpondl to FOIA requett for light cflttgoMit #, rt 
itum 9nTitori b itaam turblnet App A document! jitn.utt 
In R Udell FOIA Rqueit 81-313 Foruiai-d documinti iHUt in 
App D 

FELTOM, J, M Divition of Rulti ontf Records oa/0[)/10 ui'ri 
Hlnthrop. Btimiqn. Putnam t> Rohertt 9pp 19M3 Qht Sti 
Fjchr' 30-000- aa/OB/10, 8210070007 



8210070137 Forward! tabulated data on *toam g>i)rit'>r tci^ fc 
facllitdi Data ihould be provided to llctniti* 
IPPDLITO.T Operating Reactori Anenmunt Dranih f* B VC,t 
VAHOA.8 Optratlng Reactor* Branch 1 9pn Ifliil i^i 
FUki 80-000, B2/OB/10, 8PI0070007 



8310070175 Forward* info r itwam generator iriligrily 1 )-!)> 
operating PHRirper 7S03SO fc 81 requett Ditallt <M iri,, 
InclUiJing defect Indication!, tolie plugging crlUri* k L.tn 
pltiogid ulll not be provided except fot Point On,t, j 
OOLLEB.K.R. DivUlon of Reactor Licencing (Nfln -IV'S *-i.i 
79/03/24 MftCCARY.R R Dlvltion of T#chn(e*l JJ(vlr <MM 
onlgl, Spp 13645 196 24K Fiche 90-000. 



Ack receipt of B20B20 ritponiei re traty >*i-ii 
deflciancg Item per 8204Q6 confirmation of action || r 
Corrective action h plin* ulll be eiamlned JurLns 
iubi*quent Intpi, 

UEHIBi R C Divitlon of Project fc Retldent PrcBnai 6j."jp, t 
LEASBU-RO.R.H Virolnia Electric t, Power Co 1 B I9.-*S A.J" * 
Fletie,!)0-2BO, 62/09/10,8310010156 



aaioazoaat Forwrij IE intp R.pti so-aao/Ba-as i. M iiuitg s 

saoasO-O'POa No noncompliance noted 

DANCE.W.C, Dtvtion of Project I. Reildent Proii...t fer^. 
LEAB8URC, RH Virginia Electric k Power Co Bpp i !>?* 
Flehe 30-290,82/10/04.6210320331 



-- -a21Q2203B. IE Imp Reptt 30-280/82-25 b 90-30W8J ai s^. 
noncompllanct noted Major araa* fnipecttiT follow,,! in 
p-viou enforcement matter* fc unretolved Il4*i ! 
an unplanned rela*t of gaieou* radioactlvily 
HDSEYrC M , BAHRiK P Dlvl.lon of Cnglniirlna I *i 4 i,L,..i 
Proarami B2/09/30 lOpp 1877* 277 3K Fl, 
8310220331. 



DOCKETED ITEMS 



87 



IE Infn Notice 00-35, Suppl I, "Leaking t Dislodged 1-125 
IipLant Stall " Svc Hit end 
fTDBB.t. I Division of Fuel Facilities, Materials fc Safeguards 

lC/Ot Consolidated Edison Co of Naur York 66pp 15761 S5O 

Fithe 30-000,82/10/06.0300190233 



IE Bulletin S2-03. "Stress Corrosion Cracking in Thick- 
Iftal 1, Large-Di ameter. Stainless Steel . Hue ircu lation Syt 
piping at DWR Planti " Svc Hit end 

0EYCUNG. R C Director'! Office, Office of Inspoction and 
enforcement B2/10/14 Consolidated Edison CD of NEU York 

JlBpp 1S010 IBS 24* Fichu 50-000,92/10/14.8200190238 



8210130204 Forwards LERs B2-O55/O3L-Oj a2-D96/03L-Q t B2-095/03L-0 
WILEDN.J L Virginia Electric fc Potu.r Co 63/10/04 O'REILLV.J P 
Raglan S, Office of Director lp 15675 299 E4X 
Fiche 50-230,82/10/04,9210130201 

8210130203 LER 0B-Q95/03L-0 on 020906, charg Ing pump auxiliary oil pumb 
A trlppBd leading to tripping of roplacoment pump /mo tor 
Auilllarg pump fallur* caused by opn winding in motor 
Flip lac (mint tripping caused) by under* lied thermal overload's 
UILSON, J L Virginia Electric & Pouier Co B2/IO/04 Region S, 

Office of Director 2pp. 15679:299 24 X Flch* BO-SBO, 02/10/04, 
3210130304, 



Re-portable occurrences. LERs d related correspondence 

1O15O359 LER 91-013/03L-0 on 810719, c ontainment spray chemical 
addition tani (CAT) level found below Tech Specs Caused by 
leahiitig valve MOV-CS-2Q2B Valve scheduled for repair during 
rent outage Tank level restored 

nrLEQ/J.J L Virginia Electric & Pouier Co 01/08/17 .Region 2, 

Atlanta, Office of the Director (BI/03/01) 2pp 19704 315 34X 
Fiche- 50-291, 81/OB/17, B310150359 

10370212 Forwards LERs B1-069/03L, B1-073/03L-0 8, 81-072/03L-0 
WILSON. J L Virginia Electric & Power Co 81/12/07 O'flEILLY, J P 
Region 2> Atlanta, Office of the Director (81/03/01) lp 
15S27 O42 34X Fiche 50-300,01/12/07,8210270312 

a21Q27O220 LEB B1-072/03L-0 on BI 1109, motor operated valve 2069B failod 
to open uhtn operated from control room during testing 
Cause undetermined Valve opened normally when tested later 
WILSON, J L Virginia Electric t> Pouer Co 01/13/07 Region S, 

Atlanta, Office of the Director (01 /03/OI t 2pp 15827 046 24X 
Fiche 50-280>B1/12/07,8210270212 

eaiQ27Q234 LER 8I-073/03L-Q on 81 1 109, Isola tion valve to rec Ircula tion 
spray MX A failed to close Cause undetermined Valve operated 
normal lij later Limit switch ti torque settings eiamined & 
found satisfac tory 

HILSQN, J L Virginia Electric d Pouer Co 81/13/07 Region 3. 

Atlanta, Office of the Director (81/03/01) Spp 15327 O4 8 S4X 
Fiche 50-200.01/12/07,8210270312 

?IOGBOO15 Mil response to FOIA request for 19 categories of info re 
nuclear reactor events & safety problems Forwards documents 
listed in App A Documents in Ap p D completely withheld (ref 
FOIA Exemption 5) 

.FELTOU. J n Division of Rules and Records 82/07/12 UDELL, II A 
Critical Mass Energy Project 9pp 13665 027 24X 
Ficho 50-000,82/07/12,0210000015 

-B2-D412O4B7 Discusses problems u/uiater in Fuel oil tank Case dona not 
have generic implications 

TREHAN.M K. Director's Office 82/04/06 MICHELSON, C, 
Director's Office Spp 13665 036 24 X Fiche 90-000.02/07/13, 
B210OB0Q1S 

-B2Q51B0693 Forward* engineering evaluation of 8201 IB lots of rBsarvo 
station, svc transformer B 

TFtEHAN.N K Director's Office 82/09/10 MICHELSON.C 
Director's Office 2pp 196 66 007 24X Fiche 50-000.02/07/12. 

ea iocs ooi 3 

3JOO5OOBI Foruiards LERa B2-093/03L-0, B2-094/03L-0 t. 82-092/03L-O 
H1LEDH. J L Virginia Electric t Pouer Co 82/09/27 O'REJLLY.J.P 
Region 2-, Office of Director lp 15604 244, 24X 
FicfiB 50-230,82/09/27,9210050081 

-B21OO50091 LER 8S-O54/03L-0 on B2090B, unatt ended portable pump In USD 
to clean uatirbox C suung around b flooded svc utater pit 
containing svc mater Valve MOV-8U-202B grounded in open 
pgiltion Ceuied bij operator error MOV-BW-202B dried 
HlLSOIt. J.L Virginia Electric t> Pouer Co 02/09/37 Region S, 

Office of Director Spp 1 S404 347 24X Fiche' SO-280, 83/09/27. 
821O0500B1 

aiOOfc03Al Forwards LER B2-OB7/031.-0 (, 82-Q37/03L-0 

WtL&OH.J L, Viroinie Electric k Pouier Co B2/09/30 O'REILLY- J P, 
Region 2, Office of Director lp 15619' 006 24X 
FicAs- 80-280, 82/09/30,8310060361 

-B21GOA0396 LER S2-057/03L-0 on 820901,13,18 t 20. pump 2-SU-p-lOA 
experienced loss of suction pressure & an B2Q913 It 14, pump 
2-SU-P-10B eiperiinced similar lo of suction Caused by 
insufficient NP8H Svc uater reduced Svc water pump vented, 
WfLBDH, J L Virginia Electric & Pouer Co 82/09/30 Region 2, 

Offlca of Director 3pp ISilf 010, 24X Fiche 50-2BO. B2/O9/30, 



B31DS20434 ForuaTdt LER SS-Q5b/Q3t--Q. 

WIL60H.J L Virginia Elsctrlc t< Pouiep Co 9B/10/O7 
Region 2, Office of Director lp. 15773:270 24X 
Fiche BQ-291. 83/10/07, B210S20424 



O'REILLY, J P 



B210S20435 LER a3-05c./03L~O on 920907. praii ure in nitrog.n bottle 
supplying emergency air to PCV-MB-20SA & B discovered 
belou limit Caused bij leaking nitrogen bottle connection 
Replacement bottle correctly inttalledl. 

HILSDN.J L Virginia Electric fc Pocur Co B2/10/O7 Raolon S, 

Office of Director. Bpp 1577B 271 24 X Fiche; SO-28U 93/ 10/07. 
8210220424 

8210220392 Foruiat-di updated LER 60-019/OGX-l t, LER I S2-03a/O3L-0 b 
B2-099/03L-0 

MIL8DN.J.L Virginia Electric i. Pomei- Co 82/10/O8 O'REILLY.JP 
Rejion 2, Office of Director lp 1S779 212 24 X 
Fiche 50-280, aS/10/oe,fl2!02203?S 

--8210220408 LEB 02-098/03L-0- on 030915, safety in J action accumulator C 
found u/reduced boron concentration of 1.924 ppm, Caused 6(j 
Leakage through check valve 2-SI-144 during itniitind pipe 
flush Flush itopped Valve to be reworked during outage 
WILSON, J L Virginia Electric t, Pouvr CD 93/10/08 Region S, 

Office of Director 3pp 19779 216 24X Fiche 30-230,02/10/00, 
6210220372 

0210290367 Part Bl deficiency rept rt potential galling probUm betiuean 
item t* bonnet or 1 23-Inch & larger A105 carbon steel It 
A1B2-F22 valves supplied Feb 1781-Aug 1 7B2 Valves should be 
serviced ! *t*m ti/or bonnet replaced 

[HABELLE, LD Conval, Inc 62/10/11 HAVNEB.R.C Region 1, Off ICE 
of Director 17pp 1SB54 333 24 X Fiche, 50-000. B2/10/11. 
9210S902&7 



B210320099 Foru.rds LER B2-098/03L-Q t B2-OS3/03L-0 
MILBON, J, L Virginia Electric & Pouer Co 02/10/14. 
Region 2, Office at Director. lj> 15776-177. 24X 
Flch* 30-SBO.B2/10/14,S2102B009S 



O'REILLY, J 



LER S2-053/031--0;on Bao914-oump 2-8U-P--10A lost suction 
pressure Caused bij Irsuf f ic lent MPBH dua to throttled ivc 
uiater to air conditioning Chilian, Pump vented to restore 
MPBH 

WILSON- J,L Virginia Electric (- Pouer Co. B3/1O/14 Region 3, 

Office of Director 3pp. 13778:180 24X Fiche 50-2SO.B3/10/14. 
831022O099 



DOCKET 30-203 PRAIBIE IBLAND NUCLEAR STATION, UNIT 1 

F, Security, medical, nergBncv d flr-a protBttion plant- 

0810250200 Forwards ictnarlo outline for 821014 emergency, plan 
evaluation eieirelse, per NRC 920112 guidance Itr, 

MARD.E C Northern SHUs Power Co B2/09/01 RBginn 3. Offico 

of Director Spp 1S73B 277. 54X Fie he, BO-SB2, 8S/O9/O1, 031 02DQ20O 

8210040345 Forwards IE Imp Rpt 90-202/82-19 & 90-306/92-19 on 
B20B24-23 No nontomp tiance noted 1 

PAPERIELLQiC J Division of Enargencu Prapar*dne*i h Dparatlonal 
Support 92/O9/10 LARSOMiC, E, Northern States fouer Co Bpp, 
19993 396 S4X Flehe: 90-262, B2/09/ 10. 821OO40349 

--B210040354 IE, Insp Rsptl SO-S8S/G2-I9 & 30-306/82-15 on 820B24-29 No 
noncampllance noted. Major *r*ai Inspected, previou* 
deficianciis in prompt notification/warning igi. 

PATTERSON. J.P , AXELSON. M L Division of Efflirgencu PriparadnCB 1. 
Operational Support S2/09/G9. 4pp. 19993.398, S4X 



6210030184 Forward.* rsviiefi Pag* 4 refl*cting NRC guLdanca on 
activation of public alert & notification sgs,re 321014 
etnvrgsncij plan e>ercise 

WARD, EC. Northern States Pouvr Co. S2/O9/3B AXELSON.HL Ragion 
3. Office) of Director, Spp. 13640:173 E4X Fiehs- 30-262, BZ/09/Sa, 
82I00801B4 



88 



DOCKETED ITEMS 



6210120339 Notification of 631001 minting u/ 1 icaniBe. BNL i Engineering, 
Planning & Kg t. tnc in Bethesda.MD to diicust request* -for 
exemption from 10CFR3Q.App R requirBments r tlrf 

DIIANNI.D- C Operating Reactors Branch 3 B2/O?/2S CLAflK. R A 
Operating Reactor! Branch 3 2pp I5&72346 24X 
Fiche 30-282,82/09/29, 9210IS05B9 



B2I0070172 Forward! info re steam generator integrity 4 nilpi at 
operating PUR s, per 75O32O t, 21 request* Details of inijit, 
Including defect ind icati ons, tube plugging criteria li tuhn 
plugged ui 1 1 not be provided eicupt for Point Beach 1 
GOLLER.K R Division of Reactor Licensing (NflR-1975 onlvl 
73/03/24 MACCAR,R R Division of Technical Rnvlaw CURIJ-lflM 
null/* 5p-p 15645 196 24X Fiche 50-000, B2/08/10,MIOO?000? 



32IO26037A Ask receipt of FEKA 8SOS2A 1 tr re evaluation at offsite 
Biixfrgencv preparedness For facility eiercise & associated 
final oercise evaluation* Offute emergency preparedness 
deficiencies should be addressed ty util 

HIND-J A Division of Ennrjencij Preparedness & Operational Support 
32/10/21 GILBERTS, D E Northern States Pomar Co 2pp 15604 001 
Z4X Fiche 30-202. 62/10/2 1, 8210240374 

3210270262 Forwards info clarifginj B2Q63Qrept. "Fire Protection Safe 
Shutrfoun Analysis in CompllancB H/10CFR90, App R, Section 
III t> Substantivi Dam for Sumption Req.uostB. " per 
321001 meeting u/NRC 

HUSGL-F,D Northern State* Pauier Co B2/IO/82 Office of Nuclear 

Reactor Regulation, Director 132pp 15B29 049 SAX 
Flche 50-262, 82/10/23, 8210270262 

5 Qperatino Itcunse stage document! t correspondents 

3210040123 Bubmtts supplemental info ra utll B20614 VBn.ust for amend 
fco C-Uvn9>9 DPR-43 f. DPR~iO "LOCA ECCS Limit Ing Preal i. 
Eiposure Sensitivity Analysis for EMC XN-1 6 XM-H Reload* at 
Prairie Island I " applies to both Unite I (. 2 

MUSDt-F,D Wopthrn State* Pouer Co 82/09/24 Office of Nuclear 

Reactor Regulation, Director fp IB 581 203 24X 
Fiche 30-263. 62/07/24, 9510010123 



9210040345 Forward* IE Insp Ropts 50-232/63-15 fc 
820S24-35 Nn noncomp 1 lance noted 

PAPE^rELLO.C J Division of Emergoncu Preparedness & Optr*li = -S 
Support 82/09'/10 LARBC1N,C E Northern States Pnuier Co 2}l 
135?3 396 21X Fiche SO-S82, B2/09/10, H210040343 

--8H10040354 IE Insp flapts 50-362/83-15 t. SO-306/Q2-15 on flJOM 1 -; ^ k, 
nonenmp 1 1 ante notad Major areas inspected previoui 
ijf i c ienc IB s in prompt noti f L call on/uarni ng sijs 

PATTERSOW, J P , AXELSON.WL Division of Emorgeticij F'ripjrtdrrn i 
Operational Support Q2/09/09 4pp 15993 35) B4* 
Flche 50-232,82/09/10,8210040345 



Hng 1 l>]tlodard T-IJ! 



B20BI0233 IE Info Notice BO-35, Buppl 1, 
Imp U tit &eds " Svc list ent 1 
COD8.L I Division of Fuel Facilities, Materials t. fiaf 
B2/IO/O& Consolidated Edison Co of New York ttiff 

24X Fich 50-000-82/10/06.0200190233 



&2SOI'Ju432 Ack receipt of 820915 HP informing NRL at !tpi it 
cornet violations noted in IE Insp Hepts 30-232/02-11 1 
50-3C-6/B2-I1 

SPESSARD.R U Division of Project & Residont Program 
LAREQ-W, C E Horthern States Power Co Ip 13741 103 1MJC 
Fiche SO-28E. H2/IO/07, 0210190432 



&2100S0319 Forujiriii raaponie to Core Performance Branch 830816 concerns 
ro method* of monitoring core pouer d 1 itribut ioni for 
Cycle 7 operation 

MUSOLF, D Northern States Pawn- Co B3/09/29 Office at Njclcar 

Reactor Regulation. Director 13pp 15610 2i9 24X 
Fich 50-202,82/09/29.8210050319 

8210130-360 Dlicuiies imp!* nentatl on of HHC guidelines for marking 
hour*, provided in. Qeneric Ltr 82-12 Revised guideline! have 
been Imp 1 i4Htsted. u/eicBp tioni of 72- h per ul limitation & 
relief from control board dutlei. 

HUSOUF, D Northern SUtai Pomer Co B2/10/07 Office of Nuclear 

Reactor Regulation, Director 2pp 1567i 012 24X 
Fich* 50-000, 82/10/07, B2IOI302AO 



8210190139 Refunds to NRC 320317 Itr re violations not id In It |- 
f)pts 50-2B2/e2-lI !. 50-304/92-11 Corrective actiani 
ttartup program changed tn normalize flui diffarent* 
channel a 

LARSQNjC E Northorn States Power Co B2/09/1S 3IIH frH A , J F 
Division of Project (. Resident Programo 3pp 1S74I IEH 3Jlr 
Fiche 50-292, 82/10/07,8310190432 



J*ck receipt of G2092B Itr Informino NRC gf ttipt 4lin tt 
correct violations noted in IE Imp Reptu 50-^03/03-13 t 
50-30i./a2-13 

STREETER, J F Division of Project b Resident i'rograin* (1SMO./CJ 
LrtBBON, C Northern States I'ouier Co Ip IS/04 3hl Hi 
Fiche 50-332.62/10/00,9210130249 



8210190422 Foruiardi "Analytii of Capsule P From Mar thorn St*tB POUOT 
Co Prairie Island Unit 1 Realtor Veiifrl Radl*tion 
Burvflillance Proarara " 

HUSOLFrD Hortliern States Poutr Co. 82/10/12 Office of Nuclear 

Hactor Regulation. Director, Ip I S741 044 24X 
Fich, 50-292, aa/10/12, BS1019042S 

82IO19Q429 "Analusi^ af Caplule P From Northern State* Pouer Co 
Prairie Island Unit 1 Reactor Ven-el Radiation Surveillance 
Program " 

YANICtma, 8 E , TRnNiK C , KAISERiH T Ueltinghout* EUctrlc Corp 
HCAP-IQIOH 8B/03/31 fiBpp IS741 045 24X 
Fiche-50;-EB2, B2/10/1 2, 8210190422 



a2tOISQ23& Reipondi to NRC 020903 Itr re violatloni nnltd in It E 
Repti 90-2B2/Q2-I3 t< 50-30A/GS-13 Corrsctlvc uctioni dlllll 
generator test procedures mil bo i ovi*ed bif D212QL b 
investigative rtpt will be discussed u/operatan 
LARSON, C E Northern States Pousr Co 02/09/20 himiltt. f r 
Oivlsior. of Project & Residnnt Programs Ppp, ID/Ot ;)A2 ,il 
Flche SO-2BB, 52/10/08. 02101S0249 

B21O2S0164 Foruiards IE Insp Hepts SO-2HS/B2-16 fc SO-DOk/u.' IA 0" 
B20701-I7 d notice of violation 

BTfiEETER,J F Diviiion of Project S. Resident Program IM'IC'U 
LAR&DN'C E Northern States Pouer Co 3pp 19D.1/ 111 III 
Fich*, 50-232. Q2/ 10/13, 0210280164 



BE 1 02601 S 4 Advlte.1 that mods rquir*d bij NUREO-tt737, I ten 111 D 3 4, 
"Control Room Habl tability. " will not be completed until 
83031 S due to dalayi in receipt of matt & s4npling 
equipment 

MUSOLF. D Northern State* Pouer Co 82/10/82 Office of Nuclear 

Reactor Simulation, Director 3pp 19797.012 S4X 
Fiche: S-0-2B2, aa/10/22. 821O260154 



Inspection report*' IE Bulletins & correspondence 



-8210280168 Notice of violation from imp on 020901 -17 
STHEETER, J F Division of Project b Resident Projrini 
Ip 1SB37 201 24X Fiche 30-232.02/10/13,02102(10144 



B21oaa0171 IE Insp flepts 50-2B2/B2-16 . 30-306/B2-IA on 
Hc-ncomp 1 ian ce noted failure to post no smoking lign In 
taFetv-rela ted nuipment areas ti operators found trtiokln 
D-UBRY. H, E. , REYEB,L Division of Project & Heifdertt rr 
B2/10/13 kpf 1B037 2O2 24X FUhe 50-282. B2/10V 11, 



DJJI: .1 



e210070007 Responds to FOIA rtijuest for eight categories o rcord* re 
steam generator* !c steam turbines App A dDcun*nts jrovided 
In R Udell FQlfi R>q.uet 61-313 Foruards document) listed in 
App B 

FEL.TDM, J.H Diviiion of Rules and Rfrcords. B2/08/1O LONO, D J 
WintJiropi 8tlm*cn- Putnam (< Robirti. 9pf 13445,043 24X 
Fiche 50-000, S2/GB/10 r 8210X170007 



3306190336 IE DulKtin 62-03, "Stress Corrosion Cruel Ing in Hut- 
Mai I, Large-Di Brno tir, Stainless Stesl, Rocirculalion By* 
Piping at BUR Plants " Svc list end 

DeVOHJNO.R C. Director's Office. Office of Inspection in* 
Enforcement. 82/10/14 Consolidated Edison Co of H Yari 

ItSpp 15B10.129 34X Fiche 50-000,33/10/14,0300190339 



8210O70I39 Foru*rd> tabulated dat* on ittan genirator imp ) malnt at 
facilities, Data thould lie provlditf to Uciniees 
IPPDL.ITO,T uperatlng Reactor* ntiannent BraneJi 82/04/01 
VAFiOArB Operfrttng R*4ctori Branch I 3pp. 19643:131 24X 
FichB-30-OOOj 



S Rport*t-l occurrences, LEIU t rnlabd correiponilince 



8B1O1S03B1 Foruardi LER 81-011/01T-0 

HAVER.L Q Northern States Pouer Co B1/OB/B4 KEPI>LEft,J 
Rtfflon 3, Chicago, Office of the Director (81/03/01) Lf 
19704:063 24X Fiche 50-BS2, SI /OB/24, B210150381 



DOCKETED ITEMS 



89 



--6210130390 LER Bl-01 1/O1T-0 



B10Q12.D2 rfiesol generator tripped I. 



lac ed out during operabilitij test Caused by generator 




ape at ing in unfamiliar mode & vflr & uiatt meters being 




con used by operator 




HUK TAD. A A Northern States Power Co 81/08/24 R 


egian 3. 


CM ago, Office of the Director (B1/03/O1) 2pp 15704066 24X 


Fie e 30-2B2,Bl/OB/24,a21015Q3Bl 




E31O130510 Foruartfs LER Ba-O16/03L-O 




I1UEOLF. D Northern States Pouev Cn S2/10/06 Region 


3- Office 


ol Director Ip 15iB2 256 24X Fiche 50-282,82/10/06, 


0310130510 



--32IQ13Q533 LEfl 83-016/03L-0 on 930906, spike occurred in HCB activity 
up to I 3a uCi/0 dose equivalent I-I31 Caused bij reactor 
trip { iiioienuent uashout of fission product from e*istin0 
fuel defects Region 7 fuel will be removed 

HUNSTAD.A ft Northern States Pomcr Co B2/10/Oei Region 3, 

Office of Director fipp 15682 257 24X Fiche 50-282. B2/ lO/Oi, 
8210130510 

6210250179 Forwards LER B2-019/O3L-0 

nljgOLF, D Northern States Power Co 62/1O/15 Region 3. OFfite 

of Director Ip 1S7BB 296 24X Fichu 50-282,02/10/15,0210230179 



P Operating licence stage documents i corres.pondonc e 

5210010008 Responds to FOIA request for 19 ca togur-ios. of documents re 
nuclear reactor event* S, safety problems Forwards documents 
listed in App A 

FELTOWr J M Divinon of Rules and Records 83/06/23 UfiELL-jfl A 
Critical Mass Energy Project 19pp 15727 005 24X 

Fiche 30-000, B2/06/aB. B21001000S 

8004100193 Forwards evaluation of fatility for Cycle 6 operation All 
Tech Spec changes ti safety analijjcs required for 1300 MVI 
approved 

CHECK, P S Reactor Safety Branch 00/03/18 REID, fl W Of or at ing 
Fleactors Branch 4 (Pre BO042B ) 34pp 1 57H7 Oil 21X 
Fiche 30-000, 82/Oi/26,a21CK>100oa 

B210OS0015 Addl response to FDIA req.ueit for 19 categori us of info re 
nuclear reactor events i safety problaras Forwards documents 
lilted in App A Documents In Ap p Q complntelg withheld (ref 
FOIA Eiemption 5) 

FELTON. J H Dlviion of Rules and Records 02/07/12 UDELL , Ft A 
Critical Ma*s Energy Project <?pp 15669 O27 24X 
Fiche 30-000. SS/07/12, B210O6001 5 



S210250IQ3 LER 82-019/03L~0 on S20')17. d lese 1 cooling ualer pump 3H did 
not start on demand during testing Start attempt 7 minutes 
later successful Cause unknown In 5 day a of tes t ing ( f ai lure 
could not be reproduced 

HUUSTAQ.AA Northern States Pouer Co 83/10/15 Region 3, 

Office of Djrector Ip 157BB 297 SIX Fiche 50-382,02/10/19, 
BZI025O179 

02102503-44 Forwards LGR Bd-019/03U-0 

MUSDLF. D- Northern States Power Co 63/10/15 Region 3, Office 

of Director Ip 15790 177 21X Fiche 50-3B2, B2/ 10/ 15, 8ai02D0364 

a2!025037i LER Ba-OtB/03t.-0 on 52091 5, d iscovered that two ventilation 
flOLJ tests not performed as scheduled Caused by personnel 
error Tests rescheduled 

HU'NSTAD.A A Northern States Pouier Co B2/10/1S Region 3, 

Office of Director Ip 15790 178 24X Ftche SO-HQa, S2/1 OJ 1 9. 
0210250364 



DOCKET 50-285 FDRT CALHOUN STATION. UNIT 1 

A Application/construction stage documents (< corraspondance 



Responds to FOIA request for 19 categories of documents ri 
nuclear reactor events & safety problems Forward ( documents 
Usted in Apo A 

FELTOM. J M Division of Rulei and Records 62/06/38 UDELL, H A 
Critical Mass Energy Project 15pp 15727 005 24X 
Fichu 50-000,82/06/38,8210010000 



8105040512 DlicuiSBi actions proposed us reiult of boric acid 
corrosion damage of stud bolts & piping at PWfl plants IE 
proposal ti schedule for actions mill be discussed at B1040? 
maatlng in Bethesda.HD 

ENIEZEK.J If. Division of Resident & Regional Roactor Inspection 
81/04/02 EI8ENHUT.B Division of Licensing ARLOTTQ. ff A 
Division of Engineering Standards 3pp 1566B 127 24X 

Fiche SO-OOO, 02/07/12, B2 lOOSOOIS 

6210050247 Foru-ai-ds poat-acc i oent sampling BIJ 5 status update t< 
revised completion schedule per NIJREQ-O737.. Item II S 3 
Reason* for delay of TMI action p iJin mod discusaod 
JONEB.M C Omaha Public Pouier District B2/09/30 CLARK. B A 
Operating Reactors Branch 3 3pp 15610 330 24 X 
FichB 30-205, B2/09/30, 0210050347 

8210060176 Advi sei of delay in receipt of motor curvet from vendor 
per Q2Q521 commitment to provide justification re adequacy 
nf electrical distribution sys voltaguo. Curves t, evaluation 
scl>dulnd for lubmittal by B31201 

JONEB.M C Omaha Public Pouier District 33/10/01 CLAI1K.H A 
Operating Reactors Branch 3 Ip 15614 OO9 34X 
Fiche 50-235, 82/10/01, B2100&OI76 

821O290038 Forwards PNL final rep t an 020600-10 audit of pracsdurifs 
training addressing prasiurii ed thermal ihnck Issue Hoi (< 
min subcoolinu margin curve, NOT fc saturation curves should 
be available on single plot in control room 

CLARK- R A Operating Reactors Branch 3 82/1O/I2 JONES, W C 
Omaha Public Pouier District 3pp 1 5077 H7O 24X 
Fiche 50-285, BH/10/12, B210E9O03B 



-- 8204270046' Recommends prompt attention be given to problem of reactor 
coolant pump closure stud corrosion detected at facjlltios 
Response by B20415 requested 

EISEHHt/r.D Division of Licensing 82/O3/24 HANAUER, S. H 
Division of Systems Integration (post B11005) 3pp 15745 H70 
24Jf Ficlie 90-OOO,G2/Ofi/2B,921O01000S 



8310270041 "Audit of Fort Calhoun Proceduros 8< Training that Address 
PresiuriieiT Tharmal Shock Iue, " final ropt 

CLARK, R . rtMEB.K , RANK1M, H D Qabtelle Memorial Inotituta. 
Pacific Northuiiit Laboratory 85/06/30 3Spp 15877 531 K4X 
FUho 50-235,82/10/12,8210290039 



Security, medical, Bmergencij Jj fire protection plans 



02 i 
f 



Forwards site security plan Revision 11 Revision withhold 
tref 1OCFR73 21) 

JOMES* H C Omaha Public Power District 02/08/27 DENTON. H R 
Office of Nuclear Reactor Regulation, Director Ip 14710 097 
Fiche 50-203,82/03/37.0209170051 



631Q22O11Q Notifies of eniergcncy preparedness appraisal team B2110B 
site visit to close out App a AID ite/ms identified in 
IE Emergency Preparedness Appraisal Hept 30-383/62-27 on 
S1I2O7-I6 

SEJDLEj M C Division of Resident, Reactor Projec fc ti Engineer ing 
Programs B2/10/17 JONES, W C Omaha Public Power District tp 
1377S 163 24X Ftche 50-285,82/10/19,8210220110 



H General correspondence 



S21QG6O544 Requests that author be deleted from mailing list Further 
mailings should be sent to Metropolitan Planning Agency 
H1RSHEN.A H KirBhen, A H 82/07/30 TQURIQNY, E HRC - Nn 
DatallB-d Affiliation Oiven lo 1SA19 320 S4K 
Fichu 50-285,82/07/30,8210060244 



90 



DOCKETED ITEMS 



3210190349 IE Imp Kept 30-295/03-17 on 620930-0903 Mo nDncom[.liar.e 
noted Major areai inspected housekeepino/cleanl iriesii ontl te 
review committee d callbr 

MURPHV.M , FLIPPQ.T.A . KUNNKUTT. D M Division of Reiidenl. 
Reactor Prajict h Engineiring Projrami 95/09/20 6pp 
65742 114 Uf. rich. 50-393,82/09/22,6210190347 



Forward* IE Imp a apt 50-285/82-16 on 820901-31 No 
noncompl lance noted! 

SEIDLE.U C Divitian of Resident, Reactor Project I. Engintenng 
Programs 82/09/22 JOHES, H C Omaha Pub lie Pauer BUtrl c t Epp 
15731 306 24X Fiche 50-285.82/09/22.8210190531 



B3IOQS030I Foriuardi LER 83-017/O3L-0 Detailed event analysis tutBatci 
JOHEStH C Omaha Public Poiusr District B2/1O/QI CLflFlK, P, A 
Off ratim Reactor* Branch 3 |p 15610 261 24X 
Fiche 50-2S9, 83/10/01,6210050301 

B21Q050303 LER 82-017/03L-0 nn B2QB3Q, contr ol room operator n!li<ri 
valve position indication (or Inboard containment delation 
valve*, HCV-aaOB t B21D Caused 6y Valcor Engineering Co 
solenoid valve* containing failed solenoid coili 
CORE, MR Omaha Public Pouor District B2/O9/29 flepion4 

Office of Dlraetor 4pp 15*10 2&2 24 X Fiche 50-2US, Ktt 10'Cl 
B2 100 50301 



6210190539 IE Imp Rapt 50-285/62-16 on 020601-31 No nont on.pl lanes 
noted Hajor arias tnipi-ctad operational safety wan* itjtlon. 
surveillance teBting-malnt, preparation for refueling 1 LER 
/el louup 

YANDEUL.L A i HUNNICUTT, D M Division oF Resident. R*actor Project 
4 Engineering Programs B2/09/17 6pp 13751 30B 24K 
Fichi 30-235,92/09/22,3210190531 

3210070326 Ac k rtcipt df 920629 I tr aupp lamenting 911012 ti 0904 Itrs 
informing MflC af fpi taken to corrtcC vlolatiant noted in 
IE Inip Dept 50-293/61-16 

BE I OLE. W C Dtvition o-f Retidint, Reactor Project t Englnccving 
PTOjram* 62/IO/OS JONGB-H C Omahi Public Pouar Dlitrlct Ip 
1Si34 OS 5 SAX Flcne 50-SBS, B?/10/OS, 9310070324 

-8^10070333 Responds to NHC 610BOS Itr r* Violations natid in IE IriBp 
Rapt 50-2a5/ai-Ii Cornctive *ctiorn *1 1 OA racordt uill be 
entered into recorif ngt -141 bif 831231 [nfo updates Q10704 & 
1012 ruponin 

JONES, U C Onaha Public Pouin- District 62/06/29 8EIDLE, U C 
Diviilon up ReildBnti Re-actor Project b Engineering Programs 2pp 
15634 086 24X Flcha 50-395. 6S/10/05, B210070326 



V Operator Eia mltntions 



6210200077 Advisci that Util propased schedule for 

0737. Item I A 1 3, "Shift Manning Requirements," hat bien 
delaijed due to NfiC not having graded eiams for tuo Kniar 
reactor opcratoT trainacs Meu completion date Is OJOJ01 
JONEB.H C Omaha Public Pouier District SS/10/15 CLAflK, H 
Operiting Reactors Branch 3 Zap 13759 354 SAX 
Fiche 50-885, BS/ 10/15, 921020QO77 



DOCKET 50-2fli IKBIAH POINT STATION, UNIT 3 

F Security, medical, emergency (* fire protection plans 



53100&0091 Submit! request for mods to emergency nuti f icat ion 
to upcamino relocation of emergency facilities 
DRO-MS, J C Pouer Author! tij &f the State of Neui Volt 
SMITH. K Division of Emergency Preparedness & Opera 1 1 and I 
2pp 13614 359 SIX Fiche 5O-2B6, B2/O9/ 1 3, B210060091 



!20B190233 IE Info Notice BO-35, Supol l, "Leaking & Oil lodged 1-135 
Implant Sesrfs '" Svc Hit ncl 

C098.L ! Divnion o? Fu*l Facilities, Katrfali & Safeguard a 
92/10/06 Consolidated Edison Co of Neu York Aipf> 15761 2110 

24X FicKe 50-000. B2/ 10/06,92081 90233 



BS10Q60H5 Fciruardi "Testing t, Repair of Siren Portion of Al 
Ho tif lea tton By for Indian Point Nuclear POUJBT Oencrnitinj 
Plant." p-er discussion at 9SO908 itatui meeting 
KELLY. J J Power Authoritg of the State of Neui Vurl 
DAVIDOFF, D Naw Vorki State of Ip I!t611 29S 24K 
Ticfto 50-217, a2/09/I3,SZIOO6OMS 



1203190338 IE Bulletin 82-03, "BtVBis Corrosion Cracking in TMck- 
Hall, Large-Diameter, Stalnleit Stevl, Rec Irtu lation Sijs 
Piping at BUR Plant* " Sv<; Hit end 

DEVDUMQ.R C Director'* Offic*, Office of Inspection and 
Enforcmnt B2/ 10/14 Consolldatgd Edison Co, of Hew Vork 

HSpp 15B10 125 24X Fiche 50-000,82/10^14.8208170233, 



Notifies of Bratrgency priparedneis apprelial team 621100 
site visit to close out Appi A fc B item* identified in 
IE Emerg*ncv Prtparidnlll Appraisal Rept 30-2B5/B2-27 on 
BI1207-1A 

6E1DLE.H C Division of Rasldent. Rtaetor Project fc Enginsnring 
Programs B2/IO/19 JOMESj H C Omaha Public Power District Ip, 
15778 16H 24X Fiehe 80-365,82/10/19,8210020110 



P*rlodlt operatino reports ! r* la. ted eorre 



210190736 Forwards monthly operating ript for Sept 1982 
JONES, W C Omaha Public Power District. 82/10/12 DEVOUNO, R C 
Director's Offlc, Office of Inipoction and Enforcement Ip 
13736 S62 24* Fieh, 50-2B5, 62/10/12,62101 90736 

-8210190746 Monthly operating rept for Sept i"?82 

SHO.RT.R.IJ Omaha Pirbtic Pouer District B2/HJ/12 7jp 
15736,263 24.X Ftche 50-285,93/10/12,8210190736 

Reportable occurrence*, LER* t related correspondence 

2100401B4, Foruerds UCR S2-01B/01T-0 

JOWE8,W C Omaha Public Pcuir District, 92/09/20 SEIDLE.U C 
Roion 4, Office of Director. Ip I95ai'3.52 34X 
Ftche 50-283, 92/09/20, B2t004<HB6 

-9210040187 LER B2-(Ha/01T-0 an 820917, r.vieu, pf l.clrd-nniumatic: (E/P) 
valve positioners rev*aled absence of analu*i< or tatt 
quiltf icatlon dat *ar Honiuuell Kndtl 67400-033 

R F, Onaha Public Pousr District 93/09/17 Region 4, 

Director. 4pp, 13581:333 24 X Fleha SO-3B5, 8S/09/20p 



821006OMQ "Testing & Repair of Siren Portion of ftl&rl t, 
Sy* for Inifian Point Nuclear Pomer Generating Plant " 
Pouier Authnriti; nf the State of Neu Vorfc 
I56I4 296 E4X Fiche 50-247,92/09/15.021006014^ 



8210130047 Notification of B20924 meeting ui/u U 1 In Bethittfa. PID ti 
discuss App R Tevieu 

THOMA. J Operating Reactor! Branch 1 Oa/09/20 UAF1GA. E A 
Operating Reactors Branch I Bpp 15696 2S3 21K 
Ficli* 50-2B6, B2/09/30. B21013O047 

9310130604 Toruards Auiiliarij Bijt Drajich input to agenda -for E).?br.l 
meeting in Be thasda, MO to discuss App R ti p robabillsl lc 
risk aiseisment 

VAHOA, 8 A Operating Reacto-r* Branch 1 62/09/21 LlNCiiMRiL h 
Pouir Authorltij of the State of Neu York Gpp tSfil^ :i3l HI 
Fich 50-2361 92/09/21,9210130604 

e21C04020i Act receipt of 8E2Q902 Itr detcribing status nf *eli^Un 
undiruiaij to -correct significant deficiencies identified by 
FCHAi in response to NRC BEOB03 Itr 

BrtlTHiO H Division of Emergency Preparedn*a i OpiroUaral k-)t 
B2/09/27 BHONB, J C Poiuer Authority of the State OK tlia VcTt 
Ip 1S&83 134, 24X Fiche 5O-2B6, 82/09/27, B3lQOtOSOh 

B2L004081Q Forurds deicripti-on of activities pUnned or undiT..!, 
correct deficlenciei listeif in FEMA B2O73O intrln flndirji 
re adequacy of radioing ical emergency raaponsn proparidi^iii 
of it at* % local govts, par HRC 620803 reqwbit 

BAVKE, J. P Power Authority of the Statn of NBJ Vorl: ea/C9iiJ 
HAYHE8, R C Region 1. Office of Director lip? I39&3J3J 
Flth* 50-204,82/09/27. BSI0010S06 

B210050079 Informs that imtallation of CRT terminal In emrrjinti 
operations facilltg & video surveillance *<) * per THI Aclien 
Item III-A 1 2 ulll be complateil bij end of current 
refueling outage 

BAVNEi J.P Power Authority of the State of New Vorl (33f<tttju 
VARQArS.A Operating Fleacton Branch 1 2pp 15604 274 Hi 
Flehe SO-SBo, 33/09/30, B210O50079. 



210130570 Forward* I.ER 82-&17/03L-0 

JONE8,H C Omahft PubUe Power Diftritt fi2/0/39 SFIDLE.W C 
?i5-?K- S!:'tT ntl R " ctl>r Project t, En B initrtng Projra-M, Ip, 
18479:109 B4X FichB-30-299, BS/09/S9, B210130570, 



S210 190738 Forwards schedule for providing info requfitv-d In 
Itr re App R 

BAVNE.J P Pouer Authority at the State af New York 
VAFWA.S.A Operating fiactor Branch 1 4pp 157J6 25B 
Fiche SO-BBA, B2/10/12. B21019073B. 



DOCKETED ITEMS 



91 



6210200019 Advises th 
will not be correct 



erious deficiencies in emergency preparo 
ince State of HV t FEKA not 

addressing concerns of local officials by involvement in 

current changes 

HOLT.J Public Interest Research Group, Neui York KESSLER.J 

Rockland Cttuens for Safe Energy BCHEINER. C A Weatchester 

People; Action Coal i tion. Inc 83/10/15 PALLADINO-N J . 

ROBERTS, T M , AS5ELSTINE. J K Commissioners 5pp 13755 083 

Fich 50-247. B2/1O/13,S2102O0019 



B210300019 Advices that serious deficiencies in emergency prep are-dues 
uilll not tie corrected since Stata of NV b FEMA not 
addressing concerns of local official! bu Involvement In 
current Chang ei 

HOLT.J Public Interest Research Croup, NeuJ York POENER.P 
Parents. Concerned About Indian Point FLEIEHER, Z S Unit Branch 
Conservation Association 63/10/15 PALLADINO, N J , A HEAR ME, J F . 
GILINBKY. V Commissioners 5p n 15755 083 24X 

Flche 50-247, a2/10/lS,B21030001<? 



Ad iud i c atorij correspondenc 



BC.O!)53O7aa Acl receipt of 300416 memo u/insp rapls verifying interim 
ac^iPtu required of Facilities in BOOS I i confirmatory 

[ten E 5 in U Qammi 1 1 B00317 memo should be F 5 

NOWW.T II Assistant Director ror Operating Reactors 80/06/13 
ERYAN. S E Division of Reactor Operations Inspections lp 
G2765 2B5 24X Flche 50-247, BO/06/O3, 8O062307BB 

S31QQ60235 Declines invitation to appear before Subcommittee on 
Energy Conservation It Power Subcommittee investigation Is 

intrusion into ongoing regulatory proceeding d threatens 

Lndepend erice of Commission 

r-DHGAN.C Morgan Associa'es MOJJQAN, C Pouier Authorttg of the 
State of Ncu York 03/09/30 OTTINGEFi.R L House of Rep . Energy 
Ca-Terce lOpp 15619 360 24X Fiche 50-247.03/09/30,0310060335 

8210040103 Order CLI-B2-2S, requos t ing ASLQ reconstituted by 
CL [-62-24 to estimate when recommendations called for by 
CLJ-B1-23 can be provided 

CHJLK. S J Office of the Secretary of the Commission 82/10/01 
Atomic Safety and Licensing Board Panel lp 1S5HO 350 24X 
Fiche 50-217, 92/10/01, 9310040100 



B21O2203B9 Submittal of comments on ABLB B210O1 memorandum t, order S- 
motion for ASLB to issue reformulated contentions, on 
Commission Questions 3 & 4 6y 331115 fc to restore 
Contention 6 2 Certificate of Svi one 1 

TOSOANIiK Parents Concerned About Indian Point 92/10/15 
Atomic Safety and Licensing Board Panel 2pp 15777 307 24X 
Fiche 30-247, 02/ 1O/15, B2I02203B9 

8210210390 Requests destruction of West Branch Conservation Asioc 
S31011 reply to B21001 memo! amJum ( order J. substitution of 
end version 

FLEJ9HER. I 3 West Branch Conservation Association 83/10/10 
NfIC - No Detailed Affiliation Oivnn lp 1S764 099 24X 

Flche SO-247, B2/ 10/ IB, B21O210370 

B21O210397 Response to 331001 mcmnran ium t order Certificate, of Bvc 
enc 1 

FLEISHEHiZ S West Dranch Conservation Association 02/10/13 
4pp I57A4 1OO 24X Fiche 50-247^ S2/1O/ IB, 821 0210370 

0210300059 Response to ASLD 9210O1 ardor ASLB should narrow language 
of ASLB Question 1 1 & adopt proposed schedule for 
continuation of proceeding Certificate nf Svc enc 1 
MOORE, J . HCOURREN.H J Hearing Branch 1 B2/1O/17 9pp 
15757 290 24X Ficbs 50-B47, B2/ 1 O/ If, S210200059 



SS10O5 | 3aS4 Memorandum t, order restating contentions & establishing 
procedures based on Commission guidance 

SLErtSQW. J P . PARIS, H , SHOW, F J Atomic Safety and Licensing 
Hoard Panel B2/10/O1 ,12pp 15609 211 SAX Flche 50-347, 
82/10/01, B2IQQ50254 

6210130335 HoUnn for AELD la direct; NRC ta reschedule B21013 mectiliq 
u/utils ( Sandia in Albuquernue. NH to either Now Yorli NV or 
Washing ton. DC Intervenor unable to attend meeting In KM 
LVEtSS.E R Union of Concerned Scientists WEISS, E R Public 
[uterus!. Research Group, Neu York 82/10/07 Atomic Safety and 

Licensing Doard Panel 3pp 1 56B2 05O 24X fiche 50-347,02/10/07, 



--B21O130337 Motion for Commission to direct that all future meetings nn 
liius-a tie held in MV or Wash Ing ton, DC t< that intervenors bo 
glten notice concurrent ly ui/other parties 

IJEI-B9. E H Union df Concerned Scientists UEI8S, E R Public 
Interest Research Group. Neu York 02/10/07 Commission ers 

2pp 15692 053 24X Fiche 50-247, H3/1O/O7, 8210130335 

2L01B02O3 Reply to ASLD 321001 memorandum t> order Plant should be 
totally reinspectad u/appropr la te tests of p i ping, e 1 ec tri cal 
i. control tys conductod List of parties should be shortened 
to active participants Certificate of Svc encl 

FLEIEHERrZ S Uest Dranch Conservation Association B3/IO/1 1 4pp 
L571S 13-1 21X Fiche 50-247,02/10/11,8210150303 

6210150092 Order denijing UCS/NV PIRO 021007 motion to direct NRC to 
reschedule 931013 meeting in Al buquerquB, NM to NY or 
Uajli Ington, DC Only Conmi s si nn has jurisdiction over NRC 
performance of administrative responsibilities 

PARIS, H , SHON.F J . SLEASON, J P Atomic Safety and Licensing 
Board Panel B2/IO/13 Union oi Concerned Scientists 3p p 

137O1 191 24X Fiche 30-247,62/10/12,8210150092 



BS 1032037 5 Request for mod of ASLD B210Q1 order, to permit Rockland 
Counti) to continue pra'Sn tat ton nf ultnesse* re Commission 
Ouistions 3 d 4 prior to taking evidence on Guvstioni liSiS, 
6 t, 7 

THORSEN,E Rockland County. HV 3S/IO/11 Atomic Bafety and 

Licensing Doard Panel 2pp 15779 187 24X Fiche 5O-247r 82/1O/19, 
0210220375 

8310230410 Joint response of intervenors to AELD 831001 order Meaning 
of "ducuBi i on" of probability should be clarified & ABLB 
should immed lately reformulate contentions on Questions 
3 4 fl Certificate of Svc end 

WEISS. E R Union of CDncarnerf Scientists WEIS3, E R Harmon ft 
Weiit BE/ Id/19 Atomic Safe-ty and Licensing Board Panel, IHpp 

1S77S 313 24X Fiche 30-347,83/10/19,8310320410 



Proposed hearing schedube, Certificate of Svc end 
DRANDEWBURe, D Consol idateJ Ed 1 son Co of Neu Yard MORGAN, C 
Pnuier Authority of the State of Neu York MORGAN, C Morgan 
Associates 03/10/1? 9pp 19787 OA1 24X Flche 30-247,03/10/19, 
B2102500B1 

8310230216 Rtsponse to ASLB 021001 nrtfer ref ormulatinfl eonttntions 
Opposes adnlaslon of neu Contention t 1, Con tentlons 2~l<al- 
<d).2 aia) b 2 2(b) & ASLP Queition 3 S 1 Not ICE. of 
appearance fc Certificate of Svc encl 

MORGAN, C Pouer Authoritv of the State of NBUI York MORGAN, C 
Morgan Associates 82/10/1? Atomic Safety and Licensing Gourd 

Panel 35pp I57B9 166 24 X Ficlie 50-H17. 82/1O/1 9, 82102S0214 



0210250265 Nafcica of appearance In proceeding 

BAUMi S L Power Authority of the State of Nou Yorl 
Morgan Associates B2/10/19 lp IS791 152 24X 
Fiche 30-347,88/10/19. 0310350265 



liAUM, S L 



G51O15O141 Order scheduling 031103-04 prehearlng conference In White 
Plain*. NY re oral argument on responses to ASLD 8S1001 
memorandum fc older restating contentions 

GLEASOM.J P Atomic Safety and Licensing Board Panel B2/10/12 
2pp IBcWS 306 24X Fiche 50-247, 83/10/13. 8310150141 

6210160130 Motion in response to ASLD 021001 order, req,uest ing 
clarification & importance of term "discussion" & extension 
of time to determine position re issue of consolidation 
Certificate of Svc encl 

KAPLAN.C Neui Yorfc.NV 83/10/13 Atomic Safety and Licensing 

Boar* Panel 7ap 15719 123 24X Flche 50-347. 82/10/13, 8210180139 

3210300069 Telegraphic order granting licensee request for extension of 
lime to file responses to 821001 order All party responses 
dut 821019 

GLEASQN.J P Atomic Safety and Licensing Board Panel 82/10/1-1 
Pojer Authority of the State of New York lp 15757 2BO 24X 
Fiche 50-247-62/10/14,8210200069 



8210290287 Motion for order mvursinj ASLB 821001 memorandum ti 
order re taking of testimony on Questions 3 d 4 & 
establishing schedule for prns e-nta tion of testimony upon 
expiration of 120-day clod Certificate of Bvc encl 

VGTEREr L A Uestchester Count i/ rN/ 02X10/19 Atomic Safety and 

Licenslnj Board Panel 7pp 1 37-?! 163 24X FUn* 50-817,02/10/19, 
8210250307 

8310390324 Memorandum re ASLB 8H1OO1 order roformulating contention* 
Objects ta neu Contention 1 1, Da-sea la & lb . Contention! 
2 Ka>,2 l(b),2. Kc),S Hd),2 S<a) & 2 2(b > , Crt i t icate of 
Svc incl 

HRANDENDORO. B Commonuia 1th Eifison Co 02/10/1? Atomic Safety 

and Licensing Board Panel 49pp. 15770 243 24X 
Fiche 50-247, 0a/10/19r 02102303H4- 

8210250099 Motion for leave to file memorandum In response to ASLB 
021001 order 1 dy late Mechanical difficulties encountered 
lit/ward processing equipment Certificate of Svc encl 
BRANDENBURG. B Consolidated Edison Co of Neu York. 82/1O/2O. 
Commisionen &pp 15707 Oc>2 24* Fie he 30-247,02/10/20, 
8210350099 



92 



DOCKETED ITEMS 



92102B0242 Request* Conuni ss IOTI issue order directing all meetings 
between NSC t, licensee be, held in HashlnBton, DC or UY, that 
intervennrs receive notice of meeting! concurrently u/utlls 
4 that intervenors be provided ui/minute* of B21013 meeting 
WEISS.E R Harmon 6 Melss UEISS.E fi Union at Concerned 
Scientists 62/10/23 PALLAD-INO. N J . AHEARNG.d , QILiNSKY. V 
Comi.1 si toners Sfy I SB37 OSB 24X Flche 30-247,92/10/35, 
0210280243 

9210280230 Advises tfiat NIC dots not intend to respond to intervsnor 
motion* filed in response to ASLD 621001 oril*r until after 
621103-04 prnhfjring conference 

MOORE, J E Hearing Branch 1 BS/10V27, OLEASON. J P , SHOtl, F J , 
PARIS, H Atomic Safety *<"> Licensing Hoard Panel Ip 13037 083 
H-1X Fiche 5O-247. BZI 1O/27. B2102B0230 



G0090&D466 Forwards rasponso to 000620 request for status ript it 
Zion/Indian Point task action plan Responsibilities ir Ln 
arc' of severe accident mitigation features k not in inUrln 
aperit ional actions portion 

MEVEfl.J F Reactor Sustemi Branch BO/OB/25 NOVAK, T d Ai 
Director *or Operating Reactors 2pp 03484 00? 24X 
FieM 90-003.00/08/35,6009080466 



6010150103 Discusses union representative allegation re htr< itsirii if 
security guard personnel Addl info necessary prior to Fl/lC 
Investigation of allegation! 

WARD.H J Office of Inspection ! Enforcement, Office or t> 
Director 30/09/28 Office of Inspection (< nf ore imir,! > Offn" Y 

the Director 2pp 03630 260 24X PUbe 50-347. 6VCB/Sd. 
B01C150103 



8210*90353 Response opposing UCS/NY PIfiO 021012 motion to direct NBC to 
reschedule all future meeting* on hearing issues in NV or 
Washington, DC NRC hould b* permitted flexibility to 
dettrmint most Appropriate location W/Certi f icat* of Svc 
MCOURREN.H J Hearing Branch 1 B2/10/37 Cnunmf tilontrs 9pp 

15839 04S 34X Flche 50-247, B2/10/27, B2102B0353 

B2i0290371 Anvi s*s that Ucenieec plJin toadilrBsi all mafctir* raiied in 
r(mnses/mot ion re ASLB 621001 nmnorindum fc order at 
B21 103-04 prehearing conference 

SRANDENBURO, B Consol ldat*if EiJiaon Co of HeuYork MDROAH, C 
pcu*r Author! tu of the State at Nu Vort HDROAIJ, C Morgan 
Anoclatei 62/10/27 OLEASOW. J P . SHOW, F J . FAfHS.O h 1 Atomic 
Safety and Lioniing Board Panel 2pp 15333 012 SIX 
Fiche 50-247. B2/10/27, 8210270271 



8009250234 Submit* description of work being done on anal^tit ef 
releatr* from facilities Simple 1-D mul tlcompartm B nt thirril 
hydraulic cade being untten to analyie variety of FVCE 
dsslgni Related dita encl 

FENSTERMACHEH Seactor Systems n ranc h 80/09/10 BPEid.l P 
Reactor Systems Branch 4pp 03SS9 2B7 24X Fiche 30 JiJ.aV 
9009250234 



BQ102S0234 Responds to B00917 request ra control room revliu WJC S 
Itr detailed five adtfl items to near-term OL renu Irentnt i 
Item 111 D 3 4 requires analysi* of control room 
habitabilitu bu B10101 

HOUSTON, H M Accident Evaluation Qrancn BO/09/23 VAROA, B A 
Operating Racton Branch 1 Ip 03560 001 24X 
PicliB 30-347. 00/09/25, 8010220234 



H General correspondence 



9210190713 Informs that S3 lullo ! HA Burns authorlieii to sign util 
Itrt to MHC 

BAVIJE.J P Pguer Authorltv of the State of MBUI Vort 62/10/10 
Office of Nuclear R*actor Reoulalion, Director 2p(> IS733 209 
SIX Fiche 50-000. 92/10/13, 8210190713 

B210250272 Raquetti subatl tut ion of L Djum u/TR Freij on official ivc 
li*fc for proceeding Ralated correspondanca 

COLARULLI.P F Morgan Associates COLARULLI.P F Power Authority 
of the State of Neu Vork 82/10/19 STUCHV. B W Docketing & 
Service! Branch If 15791 190 24XFiche 5D-B47. B2/ 10/19. 
B2102S0272 



6010310793 Foruards recommendations for meeting auiillirij fod 
min flow rquirements Licensee must demonstrate d*c*v f>t 
re-no vi I for 10 minutes ui/o operator action or rei*t <on1rsl 
valve throttled position 

CHECK, P S Assistant Director for Plant BY it ems 00/0 '^iO 
NOVAK, T H Assistant Director for Operating ReaeUri ijp 
O3647 104 3At Fiche 50-247, BO/09/20, 00102 10703 



6011110094 Requests Instrumentation & Control SYI Branch twiluit 
util responses to questions re incore ins tr umentn 1 1 on lulu 
at facilities Info mil aid branch evaluation mittgaUtui 
features re backfitting of severe mitigation fciiturvi 
SPEIS, T P Reactor Sustains Branch BO/10/09 GATTtRI III 0. R 
tnstrumBntacion & Control Sgstims Branch Ip QS'J'^7 001 3* 
Flche 50-247.00/10/09.0011110004 



O Advisory Committt* on Reactor Safeguards reports !c corr*ip ondencp 

B207 180077 Forwards tomnent) on PHA study dealing u/seismtc hacarri 
Validity of conclusions rest on quality of primary data 
tames & ailufflptlons in both studies Rept* arn not valid risk 
assessments duo to data bat* limitations 

POMEROY.P H RondOJt Associates B3/00/24 OKREHF, D ACRS - 
Atfvtsorij ComnittBe on Reactor Safeguard* 7pn 15B7 001 24X 
Fich> 90-206,82/08/24.8207180077 

P Operating 1 i cen stage documents b corrBspondance 

B007010A59 Qnvracins Raactor Event Htmo BD-7 ra nvarlij simul taneoLs 
trips of Units 3 fc 3 Evint uas of negligible saf*tg 
significant* b trips uere unrelated & coincidental 
EISENHUT. D Division of Licensing SO/06/13 VOLLHER. B H 
Division of Engineering MATTSDN, R J Dlvimton of Bafetij 
TBclinDlogy. HANAUER.S H Dlviiion of Human Factors Safetg Bpp 
02613 149 24X Fichu 50-247, BO/Oi/13, B007010638 

60072803)2 Bummaru, af 800625 meeting u/util Te imp licaticn* of Clao-s 9 
accidents on Hyatt pathuAua at facilltv 

CODEC, L. R Hvdrolog-ic: & Q(ottcAnic4l Engineering Branch. BO/07/08 
LEAR.O Hvdrolagic & 0o technical Engineering Branch 9pp 
030 iA 253. 24X Fichu SO-247. 80/07/09, B0072803I2 

8005050220 Requests LG Mjnh be permitted to continue reviewing 
ovcrprv IIUTI protection sys b asiociatid Tech Bpecj 
NOVAK, T Assistant Director for Operating Reactors 80/07/30. 
ERNBT, M L Aislstant Dinctor for Technologij Revieu IP 
03078. 175- 24X Flche, SO-247, BO/07/30,BOOS050220. 

800B130741 Summary of B 004 17 meeting u/utiU In Bathesda.MD re 
containment structural responie to core ne!t acci-dent 
squnc* 

MEVERiJ, F Pautf agstimi Branch BO/07/3J Po*r Suttins Branch 

3pp 03ai6'S-13 24X Flche 30-247,80/07/31.80081307*4 

3009100100 Forwards rBconmindatiani on staff tk action plan to be 
ent to licensees for revleuft respc-nse. 

BARRETTiL H, Operating Rlactors Asstisntnt BrancJi BO/OB/OS 
Vfi9QHtG.fi Opritlng Reactor* Branch 1 <Prt Q0042B) Bff 
03516 Oi4 S4X Fiche- 30-247, BO/OB/OSr8009100IOO. 



60SO2B009B Foruards NRC questions t< util ansuars ri bathflll 

sevire accident mitigation features Evaluation nstded In l 
uli 

SPEIS, T P Reactor Sustema Branch 00/10/17 BCKAULIt,* 
Structural Engineering Branch Ip 69767 104 iMX 
Fichi 50-247.00/10/17,8010200090 



90112O0025 Foruardi Pouer Sus Branch evaluation of dUfirmm 
Indian Point 2 ft 3, in response to technical assistance 
request Requests meeting u/liceniee prior to formal rtlponis 
to evaluation 

CHECK, P B Assistant Director far Plant SusUm* OO/IQ/JJI 
NDVAK.T Assistant Director for Operating Reactors ULftt 
O3743 111 24X Fiche 30-247,00/10/21,801130002!! 



B2IOO70007 Reaponifs to FOIA renuest for eight categarlei ol rttt'H 
I tii in generators & steam turbines App A documents provUid 
In R Udell FQIA Request 01-313 Forwards documents HttiJ irv 
App B 

FELTOM.J M Division of Rules and Records 02/OB/lO 1 W*8 t J 
Uinthrop. Stimson. Putnam t< Roberts ?pp 19649 0&3 3*' 
Fiche 30-000, 02/OB/lO, 0210070007 

9210090452 Requests comments on draft Bandla "Ltr Rtpt on Rtvtmit 

Evaluation of Indian Point Probabilistic Safetu Studv" b 

821001 netting to discuss comments will be held apprai 
621013 U/a end 

VAROA.S A OperJiting Reactors Branch 1 82/09/13 BINCIM* 1. 

Pourar Author itg of the State of New York 2pp 13656 81A i*t 
Flche 9O-2B6. 82/0?/13,9210090432 

8210040400 Notification of S20921 meeting u/utll in Oethtili.HO 1i 
discuss p-ropased repair program for steam generator shell 
THOMAtJ a Operatino Reactors Branch 1 82/Ov/lfi VAflO* B * 
aperating- Reactors Branch 1 Ip 19S97 220 B4X 
Fiche: SO-2B&, 02/09/16. B210040400 

S2JO030534 Ra<(uests replg to BO 09 23 request for addl info n *** 
program 

VAROArS A Operating Reactors Branch 1 B2/07/2I 8IMCI*!* I h 
Pfl.j.r Author! tg of the State of Neu York Epf> 13*34 M* W 
Fiche SO-H86, S2/09/21, B2100S0934 



DOCKETED ITEMS 



021029030") Requests results of evaluation*, analyse! & detailed 
ascription of any ongoing or planned Imp it plant d 
schedule for repair to steam generator Results requested 
ultPiin 30 dags of recelp* of Itr 

EISENFWT.D O Division of Licensing 82/07/24 SINCLAIR. L W 
Pouier- Authority of the State of New York 3pp 15876 244 H4X 
Fieri* 50-296, 82/09/34,0210290203 

62lOiaOOi3 Summary of 820921 meeting w/ut il. Westinghouse. C-E << BMI re 
problem! u/steam generator tubes Utll proposed to sleeve 
degraded tube; t, plug remaining tubes 
Ui e-ugrapha e-ncl 

ThOMA. J D Operating Reactors Branch I 82/09/20 Operating 

fl*a;tors Branch 1 BOpp 15694 276 24X Fiche 50-286,03/09/33, 
B21O13O063 



Forwards responses to 02Q31S request for addl info, Items 1. 

3,3 (. B re control of heavy loads, per B2042 1 commitment 

Responses to items 5, 6 >j 7 le supplemental response to Item 

3 will fee provided bij 821130 

P Pocuer Authority of the State of New York 02/09/30 
A Operating Reactors Branch 1 9pp 15614 111 24X 

Fiche 50-2Q6: 82/09/30, a2lOOc.018t 

e2JOI2O353 Foruards initial comments on Sandia Natl Labs BS0025 
preliminary draft Itr rept on review 6 evaluation of 
probabilistic lafetif s tudi;' addressing mind, sei imicr Fire, 
pre-isur 1 1 ed thermal shock & fan coaler issues 

EJ'TOCLE.J 1 D Consolidated Edison Co of New Vork DAVfJE, J P Pooler 
Authority oF the Statfl of fjeu Vork 02/1O/06 VAROA, 3 A Operating 
Reactors Branch 1 62pp 15652215 24X Fiche 50-247, 02/10/Od, 
8210350253 

SZIO150031 Foruards addl payment required for BSObOA application to 
a.T.end Tech Specs re mg t organijation struc ture, per NRC 
B3Q713 Itr Addl payment made under protect pending final 
determination of legality of fee schedule 

BJV.I-JE. J P Pomer Authority of the State of Nw Vork B2/10/00 
MILLER. IJ a License Fee Management Branth 3pp 15701 S65 24X 
Fie he 50-000. 82/10/00. 02101 B0t)31 



8210070139 Forward* tabulated data an steam oenerator inp A matnt at 
facilities Data ihould be provided to licensees 
IPPQLITOrT Operating Reactor* At aesimein t Branch B2/04/01 
VAROA, S Operating Reactor* Branch 1 5-pp 15649 131 24X 
Fiche 30-000,82/00/10.8210070007 

821007Q2U Forward* IE Insp Rapt 50-234/82-16 on 320014-0915 Ho 
noneompliance noted 

6TAROSTECKI,R Division oF ProjBtt & Resident Programs 62/09/33, 
BRONB, J C Pouier Authority of the State of Neui York; 2pp 
19634 246 2-5X Fiche 50-286* B2/O9/23. H21OO70S14 

S21OO70216 IE Insp Rept SO-2at/S2-16 on 02O816-091 S Mo noneomp 1 i anc a 
noted Major areas inspected plank operati onii plant tour. 
surveillance, mainti purj Ing tt venting af tantainmenti test !i 
ma*uramint equipment pragram 

FDLEV, T . KENNV-T J , KISTER, H Dlvulon of Prajict tt R*iident 
Prworams 82/09/S2 lOpp IH634 H4B 24X FJthe 50-BBA, BS/09/23, 

8210070314 

8210290203 Request* resulti of e yt I umti, on*, dnaly tat J< detiiltrf 
deicriptlon of ing ongoing or ptannBt) imp & plans Si 
ichdule for repair to itaarn ganeratoi- Result* rvqueited 
within 30 dagi of receipt of Itr, 

EISEMHUT, D fi Dlvliion of Llcniing 82/09/24 SINCLAIR, L. U 
Pouir Authority of tha State of Ntu York. 3pp 15876 244 S4X 
Fieh* 30"28i, 52/09/24,8210290203 

8205190233 IE Info Notice 90-35, Suppl 1, "Leaking k Dislodged 1-129 
Imp 1 ant B*di " eve lilt encl 

CODH.L I Dlvltion of Fuel FacllitJe*, Materiali & Safaguard* 
82/1 O/06 Goniolidated Edlion Co of New Vark &6pp 13761 250 

24X Fiche 50-000, BH/lO/Oi, B20B1 9OS33 

B20B190B38 IE Bulletin B2-03, "8tTs Corrosion Cracking In Thick- 
Mail, Large -Dldmiteri0tainless Bteel.R (circulation 9ys 
Piping at BUR Plants " Svc Hit enc 1 

DEY-OUNO,Ft C Director'! Qffie*. Office of Inspection and 
Enforcement 82/10/14 Consolidated Edlion Co of NBU Vork 

115pp 15910 129 24X Fiche SO-000, S2/1O/ 14, 8208190236 



Foruards info re NUREQ-0737, 1 tern II u 3, "Post-Ace id &nt 
Eanpling Sgs, " par NRC 820630 Itr 

J P Pouisr Authority of the State of New York B2/1Q/12 
.S A Operating Reactors Branch 1 2pp 15736 272 2 
Fiche 50-286.02/10/13,8210190720 



"Response to 820630 NRC Info Request Concerning 
Pos t-Accid-ent Sampling " 

i Power Authority of the State of Meu York 02/10/31 
1573i 27-1 24X Fiche 50-206,02/10/13,8310190720 



Forwards request for addl info re TH! Item It K 3 25, 
r to Furp Seals " Areas of confor/nance t> deviation 
stated position should be identified Si info re design (< 
tion of affected cooling sys provided 

S rt Operating Reactors Branch I 02/10/13 SINCLAIR, L, W 
Po.er Author, ty of the State of New York 3pp 15706 211 84X 
Fit lie 30-286, B2/ 1 0/ 15, B21O2204S5 

G3IO?10-159 Forwards application to amend License DPR -64 ti proposed 
Tecfi Spec changes re steam generator surveillance 
re-qu ir emetitf 

BAVJVE, J P Power Authority of the State of Neu York 02/10/18 
VAFtCA, S A Operating Reactors Branch 1 2pp 15768 236 24X 
Fiche 50-2SA, 02/1O/1B, 8210210459 



R Periodic operating reports & related correspondence 

9210180088 ForuJn-di monthly opel-ating rapt for Sept 1982 

BROWS, J C Pqunr Authority al the State or Meu Yart 92/09/13 
Management Information Branch lp 15717 340 SIX 
Fl cho. 50-286, B2/09/12, B210I BOOB3 

8210160091 Monthly operating* t-ept tor Sept 1982 

AUTERINO.L power Authority of tha Eta fee of Neu York BS/10/O1 
6pp. 19719 341 24X Ftche 5O-2B6. 83/09/12, 8S1O1BOOHB 

S Reportable occurrencei, LEHi tt related carreipondence 

8210390267 Part 21 deficiency rvp t re pottntial galling problem betuiaen 
stem t batinit of 1 HS-lnch (< larger A103 carbon Bteel & 
A1B2-F22 valv*i supplied Feb 1931-AU9 1982 Valvoa fhould be 
serviced &t stem b/or bonnet replaced 

I8A8ELLE.L D, Corwal. Inc 32/10/11 HAVNEB. K C Region 1, QfPieo 
of Director 17pp. 13834 233 24X Fiche SO-000, SS/IO/ 1 1. 
8BI02902A7. 



T Hearing transcripts on non-ant ltru*t mttars 



B2 1 02 1 0170 Application to amend License DPR-64 changing Tech Specs re 
tteam gene-rator siirvei 1 lance requirements 

BAVNE.J P Power Authority of the State of Neu York 0B/10/1B 
Epp 15762 238 24X Ficht 50-20fii 82/10/ IB, 8S10B1O459 



B31Q21Q473 Propoiei) Tech Spec changes re steam generator 
sur-vei 1 lance requirements 

Power Authority of the State of New York 82/10/18 
157&2 240 24X Fiche 50-206,82/10/10,0210210459 



16pp 



S21G2BQQ7O Foruaris response to NRC B20924 requ*t for info re girth 
tiie-ld repair program 

SAVMEiU P Power Authority nf the State of New York 82/10/39 
EISENHUT, D Division of Licensing Slpp 19849 099 34 X 
Fiche 50-286,82/10/25,8210280070 

O Inspection reports, IE Bulletins & correspondence 

6310070007 Responds to FQIA request for eight categories of records re 
steam genera ton & steam turbines App A documents providad 
in R Udili FDIA Request ai-313 Foruards documents listed In 
ADO 

FELTOM, J M Division of Rules and Records 82/08/10 LONG, D, J 
UsntArop, Stimion, Putnam & Roberts 9pp 19643 063 24 X 
Fiche 50-000,82/08/10,9210070007 



B2100&O232 Testimony of JD D'Toole before US Kouie of RopT*n t ati voa 
Bubcomml ttee on Energy Si Conservation o-P Committee on 
Euerou ti Commerce re rol* of public participation in NRC 
proceedings W/Certif Icat* df Bye Rvlate-d correspondence, 
D'TODLE, J D Consolidated Ed it on Co oF Neu Yorfc B2/1O/OI Blpp 
15631,204 24X Fiche BO-247, B3/1Q/O1 , B21O060H32 



DOCKET BO-287 OCONEE NUCLEAR STATION, UNIT 3 

F Securi tit i me i(ic*l i emergency l< fire protect ion p lane 

B21001O352 Foruardt revilon to lafeguarda cont ingenc,i| plan Revision 
withheld (ref 10CFR7321) 

TUCKER, H B Duke Power Co 82/09/17, DGNTDN, H H OFCIe of 
Nuclear Reactor Rogulationr Director lp 15374,139 84 K 
Flctl* 30-269, 88/09/17,8210010352 

821026032? Agr*es u/d* termination to locate fir* hose itafclon* outiidi 
affected fire areas Change from earlier commitment 
accepteble 

8TOLZ,J F Operating Reactor* Branch 4 88/09/33 TUCKER,H,B 
Duke Power Co 2pp I3B30. 1B9. 24X Fiche 30-2i9, 
B2 10260329 



94 



DOCKETED ITEMS 



B310040232 Application to amend Llcen-es DPR-33, DPR-47 5. DPR-55 
r-quftts deletion of Tech Bpet 6 4 2 r. siti em-rfl.ncy drill 
J, dlflnltlon of time within uhlch redundant component test 
rnu-t be performed prior to performing maint per Tch Spec 
TUCKEK.H B Duke Power Co 82/09/27 DENION.H R Drflce o< 
Nu*lar Rtactor Regulation. Director 3pp 15SBA 104 24X 
Fich* 50-269. B2/O9/27, B2 10040 238 



B2IOI80323 Rapond* to 820913 1 tr re reactor bldg purge l-j 
given in 91O7O7 t 17 Itrs remains unchanged Schedule for 
submitting Info indicating purge sus meets operaoilltu 
nquirements requested 

LAINAS. C C Assistant Director for Operating Reactars 
TUCKER. H B DuKe Pouer Co 3pp 15745334 24X 
Fiche 30-269. B2/09/3Q. 8210180333 



6210040245 Prooc-ied revision to Tee* Spec Pages 3 3*6 b i 4-1 re site 
emergency drill & time, period" uitKin uihieh redundant 
component test must b performed prior to performing oiaint 
Dulfl Pouer Co B2/09/27 4pp I55B6 107 24X 
Fiche 50-24.9, B2/Q9/27. 3210040332 

P Operating license tag documents 4 correspondence 

6210090036 fta-poniJs to FQIA riqueit for documents re pin* designed td 
hold neutron shielding pads in place under accident 
condition* Foruardf documents listed on App A 

FELTON.J M Division of Rule* and Record! 82/09/13 EDDLEKAW.W 
Public Interest Res-arch Group in North Carolina 2pp 134,69 240 
24* Flchs 30-237, BB/OB/IS, B210QB0036 

621QOB004.7 Discusi-s work iteme to be accomplished after 9BQ423 
shutdown for eitindeiJ r-fueUng outage Louer thermal ihield 
bolt- mill be replaced u/Inconel K-7SO tudi 6 nut asiemblg 
Unit 3 tcheituleif to return to operation on B20?1S 
WAQNEft.P C Operating Re*ctor Branch A B2/06/IS DENTDW, H H , 
CAflTER.J r EISENHUT.D NHC - No Detailed Affiliation Oiven lp 
a 2 4X Fictie 50-000. B2/OB/lDi B2100B003& 



B210040107 Advliai that utt 1 i-nporte to WJC 82021B Itr uill be 
providei bg B2100B, ficip t of info From trane vendor 4: 
aitraordinary analytical wort have delayed reipone 
TUCKERiH D, DuSe Pomar Co B2/09/34 CEMTOM.K R Office of 
Nuclear Reactor Regulation, Director STCLZrJ F Operatlno factors 
Branch 4 lp I55BI 024 24X Fiche 50-2&9, 82/07/24, 6210010 107 

6210040338 Application to amend Llcenies DPR-3B. 0^(1-47 (. DPR-3S Amend 
requeit* delation of Teen Bne A 4 3 r *ite emergencij drill 
k definition of tlni uiithin yhicA r-edundant companint tut 
muit fce performed prior to performing irmlnt per Tech ap*e 
TUCKER, H B Dule Power Co B3/07/27 DENTPN. H R Office of 
Nucl*r Reactor Regulation, Director STOLZ,J F Operating Reactora 
Sratlih 4 3pp- 15586" 104 24X Ficha 50-269,62/09/27.9210040232 

6210010245 Proposed" reviiion to Tech Bpec Pagei 3 3-A t 6 4-1 re site 
emertericu drill t> timt period within which redundant 
component be*t mu*t be performtd prior to performing maint. 
* Duke Pouer Co BB/09/27 4pp ISS'Sfc 107 24X 
Filhf 50-269, 82/09/37, B2I004023a 



B210190519 Di9Cu**ei NOR actions taltn under Task Interface A]rnir' 
B2-2O tor *tam generator auiillarij fevduiatcr hoader 
d-anage Liceniet authoriifd to reaume pouer operation it 
Oconve 3 

EI3EMHUT, D O Division of Licensing B2/lO/Oi DLBHlrrChl.J 
Division of Engineering 1 Technical Programs lp 15717 Bfi! ;. 
Fiche SO-000, B2/ 10/06, 82101 50519 

B2101S052B Foruiard* aafatu evaluation re ance-thr&uoh itai |j'i-< 

repair li energencij feeduater tyi mod Licenoee juttioTtiid la 

retume potuer operation 

LftlNAS. G Assistant Director for Operating Ra<t-0ri OJV.1 : H 

TUCHEfl.H D Duke Power Co 2pp 13717 262 241: 

Ftche 30-OOO, B2/10/Oi, S21O150519 

B2I0150&35 Safety evaluation supporting resumption of power 4|i"'^ 

follouing once-through iteaFn generator repair 4 eitierg*neu 

feeduAtar iga modi 

UAGNER, P C , HAFIZ.A , RIDOELY, J Assistant n lp , c tor (or On" > 

Raactoo 83/09/29 7pp 15717 264 34X Fith 50-000. Bin', x 

S2IOI30S19 

8310130502 Advises that Flow demonstration !i uiater hamner 1ilti,|ir 
MRC B20929 1 1 r. conf irra that modified autlllarg feedwitir 
sy* latiifactor^ Sijt supplies required amount of feeduitir 
taf no evidence of mater hammer phenomenon 

TUCKEfi.H B Out* Power Co B2/10/07 DENTON, H R llfflie B* 
Nuclear Reactor Regulation Director STOLZ-JF OpiratlfJ "i "' 
Branch 4 lp 15692 S32 24X Fiche 30-387, B2/ 1 0/07, u210l3Wf 

62101SOO&5 Rxpondi to NfiC B20&OB request for addl Into n i9fl..*tF> 
ibation alectric distribution syi voltages Requm-ted Into 
expected bu 821022 

TUCKER, H D Duhe Power Co B2/10/OB DENTDN.lt R (IflKi a* 
Nuclear Reactor Regulation, Director BTOLZ.JF Opratln| P+t ' 
Branch 4 lp 15720 010 24X Fiche 50-S69, S2/10/09. 



-921O1300&O Forwards partial response to Franklin Itvseaich Clr 

tichnical avaluatlon rept re control of heavv lo*cft.pr 



TUCKER, H B Dute Pouer Co 83/10/09 DENTOM, H R GfFli-r i 
Nuclear Roactor Regulation, Director BTdLZ, J F Clptr4Ui| 
Reacton Branch 4 5pp 1S720 Oil 24X Ficha SO-So 1 ?, DJ/10 
8210180053 



9210110145 Forwards Amend* 113,113 It 110 to- Llcens-es DPR-3B. DPR-47 t, 
DPR-33, repec t Jvely, aaf t<i evaluation -Si notice of issuance 
& availability Attends revise Tech Spies to alloui full pouer 
operation of Unit 3 during Fuel Cycle 7 

WAQNEft, P C Operating Reactor* Branch 4 B2/D7/29 TUCKER; H B 
Dule POUIBT Co. 2pp 15737341- 34X Fiche flO- 269, 32/09/29. 
B2XOI7014-S 



821O2J013I Reiponds to MRC 9 2090 B Itr transmitting technical i- 
rjit on emergencij feeduiater iiji Syi may not meat atL currinK 
criteria for seismic q.ua 1 1 f Icat ion. but ul 1 1 remain 
func t iona 1 lij operable during ODE 

TUCKER, H D Duke PouBr Co B2/10/I3 DENTDNi H R Cffltl o 
Muelear Reactor Regulation, Director STOLZ, J F GpirAtir 
Dranch 4 4pp 13766 356 34 X Fiche 50-269,02/10/13- 



8210190184 Amends. 113.113 E. 110 to LUtntsi DPR-39,DPR-47 fc DPR-55, 
respec tivelij, revisins Tech Bpeci ta allow full pauer 
operation at Unit 3 during Fuel Cycle 7 

BTQLI.J F Operating Reactors Branch 4 62/09/39 31pp 
1S7S7 343 24K Flehe- 30-269, B2/09/29, B2IO190I 49 



-BB10W01A1 Safttij evaluation -supporting Amends 113,113 b 110 to 
Uesnitu DPB-3B, DPR-47 * DPR-S3, respectlveilj 
* Office of Nuclear fleactor Rigulatlan, Dirctor a2/09/Z9 
15758 018. 24X Flcha 30-269- B2/09/27, B2 1O170145 



6pp 



~ B21019O1A9 Notice of {nuance J, yal l*b il 1 1 of Amendt 113.113 Si 110 to 
Licns DPR.-3S, DPR-t7 !. DPB-9S, respectively 
8TQL2iJ F. QperatinB Reactors. Branch 4 8B/09/8?, 2pp 
15758 01B. 24X Fi ehe. SO-B4?, B2/09/S7, B21019014B. 

8210210292 Advitu that revieu of info on mad* to emergency feaduater 
syi & rvpalrt mida ta onci-tnTough sttain gineratori 
complete. Plant mag resume operatton u/llited eonditlont 
LAIHA8,0 c Anlitant Director for Operating Reacton B2/09/S9, 
TUCKER, H, H Djke Pouir Co 3pp 19774:1347. B4X 
FIch, SO-2B7., 82/09/2?, B&102 10292 



3210210407 Application to amend DL>, revi sing Tech Spec 3 I Mtr.'| 
full pouer operation of Unit 1 for Interim period -until 
appropriate lafety valve ring settings can be imp leminled 
TUCKER, H B, Duke Power Co 82/10/14 DENTDN.II R OlUtt *f 
NucUar Reactor Regulation, Dine tor STQLZ, J F Clparaiif-f *tj. 
Branch 4 80 p 15764 03 S 24 X Fiche 50-349, 62/10/14, S3JOJ1C+: 1 

8210210411 Proposed revision to Tech Spec 3 1 allowing lull it.i' 
operation of Unit 1 for interim period until approprl *lt 
lafetu, valve ring setting can be implemented 
1 Duftg Pocjtr Co, B2/10/14 lp 19764 04B 24V 
Fichl>: S 0-26 9, B2/10/14, B210210407 



OJ Inipection reports, IE Bulletins 1< correspondence 



B210O70007 fleipandt to FOIA request for eight categarlrt tl tt 
*tim generator! ti steam turbines App A documents pravltfea 
in R Udell FOIA Request 81-313 Forwards document! 1UU< i 
App B, 

FELTDN.J H Division of Rules and Recordl, B2/OB/fO LOA 
Hlnthrop, Stimion, Putnam t Roberti ?pp 19649 063 StI 
Flche:5-0-OOO, 82/03/10,8210070007 



8210210299 Safety evaluation supporting etean generator repair It 
emergency feeduater iiji morit 

* Office of Nuclear Rtactor Regulation, Director. 82/09/39. 7pp. 
19774:390, 24X Fieht. S0-2fl7, 82/09/B?, 8210210292, 



9210070172 Forwards info re steam generator Inttarit^ ! irt|i tt 
operating PWft-s, per 790320 b 21 requests Detail* ol Inipi. 
Including <Tafct indications, tube plugging criteria i. t-ulu 
plugged will not be provided except for Point Beach I 
QOLLER, K. R. Division of Reactor Licensing (WHH-I97J -gnl,-: 
73/03/24, MACCARY 1 R.fl Division of Technical Flevliu <MM-ifT 
onli|> Spp, 13649 194, 24K Fieht 90-000, 82/OS/IO, WJMTCX T 



DOCKETED ITEMS 



95 



015036'? Forwards results of investigation of Item 7a of IE Insp 
'epli 3O-269/B2-2I. 50-270/02-21 t> 30-287/82-21 Deadtlma 
alut! for gairma spectroscopij analysBB of waste gas silver 
eolite cartrlrfgea will cause onlij insignificant errors 
OCHER.H B Duke Pouier Co 82/OB/I7 Q'fiEILLY, J P Region S, 
Iffice of Director 3pp 1S7O4 269 24X Fiche 50-269, BS/QB/17, 
13101 5O369 



8210130290 Request*. relief from intorvue inp rq.uir ementa 
(hydrostaticl of Git t ion XI of AS HE Boiler ! Prure Veiul 
Code 

TUCKER, H B Duka Power Co 92/10/04 DENrQN.H R Office at 
Nuclear Reactor Regulation, Director STOLZpJF Operating Reacto 
Dr*nch 4 20pp lSA7ff 243 24X Fiche 30-269, B2/ 10/04, B210130390 



QOI0117 Forwards IE Inap Repts 50-269/83-33, SO-27O/B2-33 b 

,0-337 /SJ-aa an S20B17-20 No noncomp 1 iance noted 

irtrrcE.M C Division nf Project !< Resident Programs 82/09/03 

HJCKER.ll D Duke fouler Co 3p p 15566 O19 24* 

xch 50-269, 03/09/02,6210010117 

'310010134 IE Insp Ropts 50-269/83-33,50-970/82-33 (. 30-337/03-33 
on 8.20Q17-2O Ho noncomp I iance noted Major areas inspected 
action OBI previous enforcement matters, au 11 1 lary feeduatar 
header repair !< insorvice Imp procedures 

CROULE^.D R , BLAKE, J J Division of Engineering t. Technical 
Pragrans B2/09/01 Bpp 1 5566 021 24X Fiche 50-269, 02/09/OB, 

aaicoioi 17 



OQIOISQ Forwards IE Insp Repts 50-269/82-3O, 9Q-27O/02-30 ti 
iQ-287/a2-3Q on 0307(6-0810 Mo noncomp 1 lane e noted 
WICE. H C Hiviston nf Project 6 Resident Programs 82/09/03 

UCER,H C Dulo Pnuier Co 2pp 15567 258 24X 

Jche 5O-269, 82/09/02,0310010158 



IE Insp Ropts 50-269/82-30-30-270/82-30 fc 30-287/32-30 on 
e3O71&-OS10 No noncompliance noted Hajnr areas inspected 
operations , survei 1 lance testi tig- mainti NUREQ-0737 mods EC 
refue-ling activities 

ORDERS. U , FALCONER. D , BRVANT, J C Division of Project & Resident 
Programs B2/O9/02 13pp 15567 36O 24X Fiche 50-369,82/09/02. 



8208190233 IE Info Notice BO -35. Sup pi 1, "Lasting & Dllladgeil 1-123 
Implant Setdi " Svc list *nel* 

COBB-L I Diviiion of Fu e 1 Facllltln, Materials 
B2/10/06 ConiolidatBd Edison Co of Meu York 

24X Fiche SO-OOO. B2/ EO/06, 93081 90233, 



Safeguards 
66pp 15761 250 



B2 10220426 Foruardt Rivliion 5 to rKponie to IE Bulletin 79-02, "Pipe 
Support Dale Plate Deiigns U* i n g Concre-fce Eipanilon Anchor 
OoLtt " 
TUCKER, H B Dull* Pauirr Ca B2/1O/OB O'flEILLV-J P Region S, 

1577B 373 SAX FichB 50-269, B3/10/OB. 



OfPic of Director 
0310220436 



24pp 



830B19023B IE Bulletin 82-03, "5fcrs Corrosion Cracting in Thick- 
Mai l,Large-Dim ter, Stilnlei* Stael, Recireulati on Sgs 
Piping t BHR Planti Bvc list gucl 

DEVaUNO.fi C Dlractor'i Officer Office of In a pec U on and 
Enforcement B2/10/14 Contol Ida t ed Ediion Co of MHJ York 

115pp 1501O IBS 24 K Fich* 30-OOOj H3/1O/ 14, B20B19023B 

R Period if ope rot ing reporfei & related corrsmp nndonce 

B310190544 Forward* monthlg operating rpt for Sept 19B2 

TUCKER, H D Duke Power Ca 82/1O/IS Director'* Office, Office 

at Inspection and En f op cement Ip 19751 343 Z4X 
Fichu 50-36?, ea/10/19, B31OI70344 



CG1O43B Act receipt of 830HOD Itr informing NRC of steps taken to 
Direct violations noted. In IE Insp Itepts 50-2t9/02-23, 

>o-27o/e2-23 (. 5o-aa7/aa-23 

, ft C Division of Project fc Resident Programs B3/09/17 

D Duke Power Co Ip 1 557O 102 34X 
'tclte S0-?ii9, Ba/0?/17, 0310010458 

3210010463 Rasponils to NRC 820712 Itr re violations noted in IE Insp 
FlBpts 50-369/32-23,50-370/82-23 4 50-287/82-23 Corrective 
actions porsonnel counseled & valve 3HP-I4 cut out ft 
proper lij roinitalled 

IUCHEH.H G Duke Pouiar Co B2/OB/05 'REILLY, J P Region S. 
Office of Director 4pp 15570 183 24X FichB 50-269,82/09/17, 
Q2100IO43B 



Forwards IE Insp Repts 30-269/03-23,90-270/82-23 b 
SO-2S7/BS-2.T an 820910-0610 (. notice of violation 
LEWIS. R C Division of Project i Residnnt Programs 82/07/12 
PARKER, W O Duke Pouier Co 2pp 15370 187 24X 
Fiche 50-267,82/09/17,8210010458 



B2I0190553 Hanthlg operating rpt for Bep.t 19 
REAVIS, J, A Dak 9 Pouier Co 83/10/15 lipp 
Fiche 50-267.82/10/15,9210190344. 



15791 344 24X 



8 Reportable occ irrranceai LERs & related tor rasp and once 

S210120114 Advi*e of immediate need for imputing specific 
requirement* r operational rvatrictlcmi far- Class IE 
12O-volt ac vital instrument buiam in operating p lantl 
MICHELSON.C Director's OPfieo BO/07/15 DEN TON, H R Office aP 
Mutiear Raacbor Regulation. Director If 3667 165 34 K 
Fiche 50-000, BO/07/I3. B21012O1 1 4 

83I001000B Responds to POIA Tq.uet for 1? categoTte* of documentn ro 
nuclear reactor svnnti ti tjfetij prob-lamt Foruiarda document' 
lilted in App A 

FEL.TDN. J H Division flf Rule* and Records 82/06/39 UDELL, R. A 
Critical Mass Ensrog Project ISpp 15737 003 H4X 
Fiche SO-OOO, 82/06/20.3210010000 



IE Insp Repts 50-269/82-33,50-570/82-03 fc 50-287/83-33 On 
020510-OJilO Noncomp 1 iance noted failure to follow procedures 
resulting in plant trip l Inadequate procedure resulting in 
improper reassembly of safety-related valve 

OREEfIS, H , FALCQNER.D , BRVANT.J C Division of Project fc Rosident 
Programs B2/07/09 Igpp 15570 191 24X Fiche 30-869.82/09/17, 
O2 100 10458 



10150353 Forwards IE Insp Repts 50-269/83-32,50-870/83-32 & 

30-207/32-32 on 820817-10 No noncorap 1 ianeo noted 

DANCE. H C Division of Project (. Resident Programs 83/09/17 

TUCKER, II B Duke Pouier Co 2pp 15703 267 24 X 

Fiche 50-269-82/09/17,5310150253 



IE Insp Repts 50-269/82-32,50-270/82-32 S- 50-287/82-33 on 
Q20817-1B No noncorapllanCB noted Major areas inipec tei)< lab 
dC & rev leu of radiochemi stry procedures Si records 
EvAN3,C D , MONTGOMERY, D K Diviiion of Emergency Preparednett & 
Operational Support 82/09/19 3pp 15703 369 34X 
Fiche 50-3ii9,a3/09/l?,flS10ig0253 

10ISO131 Foruarila IE Insp Ropti 50-269/82-33, 50-370/B2-35 t 

50-237/82-33 on 830909-10 No nonconR 1 ianca noted* 

DAHCEr M C Division of Project & Resident Program* 88/09/33 

TUCKER rH D Duke Pouer Co, 2pp 1569S 312, 24X 

Fiche 50-269,83/09/33-8210190131 

6210150143 IE Insp Repts 90-269/82-38,90-270/82-39 & 5Q-287/B2.-35- on 
BSOfOB~lQ No noncomp 1 iance noted Major areai inspected 
ftCS leakage calculation* 

BUHNeTf.F T, , JAPE.F Divifion of Engineering 1. Tnchnical 
Prc-gr am i 62/09/21 4pp 19698:314 S4X Fiche SO- 2i9. 02/09/23, 



8210190447 PNO- 1 1 -B2-10B- on BH1O1 O, Increating stam generator tube 
leakage indicated in 3A iteam gvnvrator Reactor placed in 
hot shutdouinv No abnormal radioactive relaases Identified 
IflNATQHlfirA, . DRYANT, J C, Rag i an 2, Office a* Director 83/10/13 
Ip 13740' It 1 ? 24X Fich* SO-UB7. BS/10/1S, B21OI 90447 

0210190633 PKO-II~B3~111 on aSlQ14,Ur.it 3 ,hut dc-un after determining 
that pi-eisur i ler cad* *aftu valve iSevign flow could not be 
fully maintained if called upon B*ven-rfay outage required 
ta change valve* Enamp tloti requeittd for Unit 1 

IGNATON!S,A Ftaglon 2. Office at Director 82/30/14 Spp 24H 
Ficha. 80-207. BB/10/14, B21OI 90AS3. 

8210190699 R8 on BS1014,Unlt Z care relief valves declared Inoperable 
due to inlyilt prompted ou. Bin vafetg concarn, Ifnl t 3 valvii 
uere offiltv undergoing ring id jutmnt Immediate shutiTouin 
at Unit 2 commenced. 

* Duko POUIT Co B2/10/14. Rfgion S, Dftica of Director. Ip. 

1S736 BOO 24X Fich' SO-270, 82/10/14, B21O19O693. 

8210290303 Foruardt LER BZ-OlO/OlT-O D*taild >v*nt analu.l end 
TUCKER, H B DuKe POUBF Co 92/10/16 O'REILLY, J.P Region 3. 
Office of Director. Spp 13993 01B Z4X FichB, 30-287. BB/10/ IS. 
821027O30B 

--6210390313 LER B2-Q1Q/O1T-0 on 821004, diicovdrail that waellu boron 
wait* starag* tank boron lample not taknn ai ichedirleif, 
contrary to Tech epic 4, 1 3 Cauied bg parionn*! not having 
cce* ta patted ichadifla board 1 Board rap la,c>d. 
PETTV,J C. Dute Power Co. B2/1O/I8. Region 2, Office of 

Director. Ip. 19BS3 OBI 24>C FUNf 50-2S7. B2/10/ie, 8210.2TO3GB 



96 



DOCKETED ITEMS 



DOCKET 50-2B9 THREE NILE ISLAND NUCLEAR STATION, UNIT i 
F Security medical, emergency !i fire protection plan* 

B21Q050471 Forward* iiamption from annual emergency plan eerciie 
requirement* of IWFRSOj App E T level of govt 
part U ioatlon 

SIOLZ.J F Opt-4t l ng Reactor* Branch 4 B2/09/14 HUKlLt-H D 
Qneral Put 1 i c Utilltie* * CPU Service Corp, 7pp 15636 271 24X 
Fich* SQ-2B?, 82/09/14.8210050471 

Eai0030495 Exemption from annual emergency plan requirements re IttVel 
of govt par ticipation in eiercnea 

EISENHUT.D Division of Liceniing BS/Q9/14 Osner*! Public 

Utilities - GpU Service Corp flpp 1S62-6 398 24X 
Fiche 50-289, 82V09/ 14, aai005(H91 

82IO06032B Forwards revisions to fit** fiaiards analysis rept ti App R 
Sett ion III TI iafe ihutdo-un evaluation 

HUKILL.H D General Public 1/tiliti* -CPU Service Corf S2/10/O1 
EISENHUTj D Dlvlsinn of Licrntins 2pp 15620 013. 24X 
Fich* 50-237.62/10/01,3210060220 

8210060230 Revltiorn to fire h,aiard analysis rept k App R Section 
1 1 [ re iafe shutdown evaluation 

General Public Utilitim - OPU Service Carp 82/10/01 32pp 
15630 019 34X Fiche 50-239, S2/1&/OI.S21 0060223 



8210050176 Brief in mpport of eiceptians to ASLD B1CB27 & B30' 
partial Initial decisions re mgt ittuet h reopened 
proceed ing i 

BRiftOFOaD.L . DORDSHOW. J Three Kilo Island Alurt 03/09/30 
Atomic Safety and Liceniing Appial Panel 93pp 15i04'OB3 
Fichr 50-389,83/09/30,0210050176 



621003O192 Brief on e. captions to ABLB B10B27 t 020727 pirtltl 
dtciilonn on mgt Inuat, training !< integritv Certificate O f 
Svc encl 

AAHODT, M H Aamodt*. Tho 82/07/30 Atomic Bafetij tnd U 

Appeal Pans-l 36pp 15607 336 24X FichB DO-2B9, 
82100501V2 



B210050237 Adviiv* that THI AUrt unable ta pruiont f ul l j itiit 
some L*iut >n brlif due to severe time constralnti 
BRADFORD, 1. ThrssMile I i land Alert B2/07/30 EDLEfli J 
Safety and Licenting Appeal Panel DUCK. J H , KOHL, C Alnfl 
ard Licencing Board Panel Ip 15609 051 34 X 
Fiche,SO-2a9. 92/09/30.6210050237 



S2 100 602 10 Brief tupportlng UCg brief on sicsptions la Atl B 
partial irittl*! decision ASLD cannot continue to r D lv on 
operator judo rn*nt understanding d integrity to CDmpeiitalr 
for lacli of reliable equipment Certificate of Svc ncl 
HE I S3, E R Hrtrojiolltan Editnn Co WEISS, E R tl.irmnn , Ut 
B2/ 09/30 Atomic Safety and Licensing Appeal Pnel 16 (* 

15614 121 24X Fichtt 50-2B9, 02/09/30. B210060210 



B21OI3024B Advitec of dlry farm located ipproi 1 I mile* rait of TMI 
ijielding ifoae c omrai tmiint greater than fix of isven prviant 
milfc lampling tfcation* R=!ult of land cenui to bo included 
in. 530501 annual radiological environ operating rept 
HUKIUL.H D Ovneral Public utiliti** -CPU Service Corp B2/10/04 
HAYNES.R C Region 1< Office of [H rue tor Ip 15476 008 24X 
Fiche BO-aB9. B3/10/C.+,931O130B4B 



ClaTi*|* position re Action 4 ut IE Bulletin 77-21, "Ternn 
Effec-ti on E-*vl HeaGurementi " Iricluilon of tablei. curvti 
or CQrrvctior Factors in emergency procedures uill 
unneceii-ari 1'y comjil icat praceduret, 

HUnlLL.H D General Public Utilitis* -OPU Bervice Corp BH/IO/01 
llAYNea.ft C F1gion I. Office cf Dicector 2pp 15701 334 34X 
Fie h' 50-889! ea/10/04, 621015020-2 



B31O06021B Qrmf in tupport of exceptions to ASLD B3b?l pirll* 1 
Initial decision on reopened proceeding on operator 
cheating CertlfiCAte at Svc encl 

ADt-ER.R H Penni^lvania. Slate of 03/09/30 ft t omit CTifrlU 

Lioniina Appeal Panel 45pp 15614 343 24X rich* 90-fQV. 
62/09/30, B21O06O21B 

Q210070194 Fnruardt TNI training program asHHSiemint, rBpr*tn.tt r-t 
recent view or program & covering hearing topics Q|=u hat 
made i i gnif i cant progress Recommendat ion for changgi mad* 
W/o rfpt Bvc Hit oncl 

BLAKEjE L Shatir. Pittman, Potti fc Traiubridge BUAHt. L b. 
HetropiMitdn Edit on Co 02/10/05 EDLES.G J > DUCK. J II , Ki'S- 
Atomic Safety and Licensing Appeal Panel 4pp IHiiBI BM J+l 
Fiche 50-289, BK/ 10/05, B210070194 



G310130161 Reipondf to ABLftD 011B04 partial initial deciilpn re aler 
t- notification ayi Siren *i]i for offiltt alerting adeg.uat*> 
pending determination of compliance u/NUREQ-0454 & 
FEHA REP-1. 

KRIMH.R H Federal Emirjonci; Management rtgencg 0B/10/Q6 
ttRIHES, D Dlvition df Emaroencu PrapArttfneti 9pp 15673 0'61, 
Fich* 50-267, ea/10/Ofi.B2l013016l 

321O1303SO Bobmiti updated itatu) rept on offiJtt emergency planning 
tiiuet at facility Emergency prfrparedneit brochures 
dlitributvif Slrtn iy tetting titifactoril(j ccmpleted 
Con<nuncati or> drill held an quarterly haiii 
KRIMtl.R H F*>d*ral Emergency Management Agency 85/10/0* 
CRIMES, 9 K Division af Emergency Priparadnti Bpp 15*79.150 
24X Fich* 50-26?. 02/10/06,6310130320 



Ad judicatorg correspondence 



6310070080 Board Notification B2-93 foruards RJ Mttion 020830 memo 
to DO Eiienhut notifglnj of r(ult of Samiicale tfit on 
fd & -bleed capabllitv 

LAINflS.O.C Aiilitjnt Director for Operating Reaeton fl2/09/14 
Alamit Safety and Liceniing Appeal Ptntl 4pp 15645:317 24X 
Flehe 80-289. B2/0 1 ?/!*, B21 0070020 

9210070032 Renjaiti all PUR llcenilng boariti bi informed of rinultt o f 
8miicle feed d bleed teife. Uneipectid uncoviru of cor* 
ImUlator occurred 

MATTEON.R.J. Divition of SijtiM Integration <po-it B11C-03). 
B8/OS/30 EIBENKUr, D, J Dlvfilon of Lictnting 3pp. ISfi49-321 
S4X Ft ch: 50-2B9, B2/09y 1 4, B2I007002B 

8210070035 Rtcomniendu (hat board notification on SmUc*li Fetd & blued 
ei[prinint not be inued 

BASBETI. O E DIvlilon of Accident Evaluation 92/OB/23 
SPEIS-T. P. AttUtant Director for R*ctop Safetif 2Bp 
1S649 324 34X Fiche: 90-2B9, 82/0?/14.Bai007002e. 

3210010487 Menarandiin fc order granting liceniet nquttt to refer Aanodt 
8BO-)03 motion to reopen tvdan*i*rg retoril to A BLAB ABLAB 
Iflcli jurliflctlon over mbj matter 

0MITHiI-M. Atomic Bafti| and Lieenilng Boafd Panel BS/Qf/St 
Metropolitan Ed lion Co. 3pp, IBSi9;3S3. 24X Fieha 50-.239, B S/09/29, 
BE 100 10427. 



8210070133 Order tcheduling 02110? hearings in Harriiburg, I=A C er 
mill hear partlee re ASLB 011214 h 820727 partial Itllll*! 
decliioni ^ uill hold public meeting on restart 
CHILK. S J Office of the Secretary of the Commliiion (l;/l-C^ 
3pp 13627 077 24X Fiche 50-237.02/10/06.031007014') 

210080094 Foruiardi liceniee fint annual progrtts repl on ir^il 
of ia,ct replica ilmuUtar Did package delayed from Apr la 
Sept. 1782 Installation eipectsil in 1-7SS Svc Hit int] 
QUAKE, E, L Shaui. Pittman, Pott* k Troubridg* Di/tHE.t [ 
Metropolitan Etflion Co ea/IO/Oi EDLES, J . BUCK, J II , fQ 
Atomic. Safetg and Liceniing Appeal Panel 7pp ISt^O U1J 
Fich 30-289,82/10/06,9210000074 



8210120274 Reapondl to 020914 n oa rd Notification DM-OK-yD r 
teiti on feed t< blied t> motion that ABLAQ direct HilC Ln 
provide pertinent documentation UCB Etceptioni 9- 1 I , I6> lO 
& 1O7 should be nuitalned W/Certi f 1 ca t of Bvc 
POLLARD, B, D . WEIGSrER Union of Concerned SeUntltti 
Harnon I Ueiti 82/10/07 Atomic Safety and tlcenitng 

Panel 17pp 15A53 297 S4X Fiche 50-207, 02/10/07, 



8210130279 Mvitft that Itr-dmig nated Individual rttlgnH 
S2IOI9 Individual uai MRC liceniad control room operilor 
wJion ptrformance an teiti V e>ami uai lnut in riopine* 
p4>ae op praceeding Svc li*t encl 

BLAKE.E L Shauj Pittman, Pott* t< Troubridge BLAKE . t I 
Metropolitan Edion Co 02/10/07. EDLEB. J . DUCK.J II , 
Atomic Bafety and Liceniing Appeal Panel Gpp 19670 IA? 
Fie he- 30-209.82/10/07, 0210130278 



. ( , 
2*. 



B210l2025i Foruardl Corami*lon 82 1006 order ichtdullnp. 
in Harr itburg.PA. in reiponi* to B1121& requeit 
BICKMITil. Office of the Q>nral Countnl 02/10/00 10( , ~ 
Kile Itland Public Interdt Reinurce Center Ip, ISA13!|| ... 
Fiche 50-269,02/10/08,8210120256 



8310120314 Forward* Commliilon BS1006 order advlilng of 
meeting in HarrlburgiPA 

BICHWIT, L, Dffle. of th Oeneral Couniel 82/10/00 
Dauphin, County, PA Ip 1S631 251 24X Fiehe, 30-Sa 
9210120314. 



8210130238 Req.ueiti to make limited appearance itatemenl *t t, 
8211O7 meeting In Karriiburg. PA re lifting of im|d|ati **' 
f tuc tiveneie order* 

HOFFHAM, J Fi-lendi & Family of TM1. fl2/10/OB CHILX.fl . 
of the Beeretary of the Commlfdon Ip 13470 aOS 94] 

Fich*' so-aa9 f ea/io/oa, 0210130233 







DOCKETED ITEMS 



97 



S-aiG2H)359 Motion to file brief supporting etceptions to ASLB B 10807 I, 
330727 partial initial decisions out of tin* an SSI 002 
C ircumi tantes beyond intervene? control necessitate 
eitension Certificate of Svc end 

AAMODT.M H Aamodti, The S2/IO/09 Atomic Safety and Licensing 

Appeal Panel 4pp 15763343 24X Fiche SQ-2B9. BS/ 10/09, 
Q21D21O399. 

82101S01AO Advliei that Itr-deiionated Individuals *c VV will not 
T-Biponif to UCS, Commonwealth of PA, THI Alert b Aamodt* brief 
supporting eiceptioni TTt! Alert Eiceptions 23 ti 24 & Aamodt 
Eiception 133 waived 

VQIOT, H H LeBoeuf, Lamb, Lefby ic MacRae 82/10/13 EOLEB- J , 
BUCK..) H . KOHL.C N Atomic Safety and Licensing Appeal Pan* 1 If 
13719 169 24X Ficho 50-209. 82/10/13, B2101S0160 



Memorandum ! Order CL1-B2-31 directing IE to determine 
uhether civil penalty proceeding ihould OB Instituted 
against licensee for acti uncovered in hearing It Ofc of 
[ fives i igationi to investigate illeged matl falie statement 
CHILK, S J Office of the Secretary of the Convni It ion 82/10/14 
IQpfl 15711 135 24X Flche 30-289, B2/1O/1 4, B2I01B0180 



6310300033 Advi iff that licensee will file on* coniol idated brief- 
931104, in rssponse ta Commonuaa 1 th of PA.TMI Alert, UCB & 
Aaitiadt brief! supporting appellant eiceptioni re mgt 
is-sues.Svc lilt end 

BLAKE. E L Shaui. Pittman, Potti t< Troubridge BLAKE, E L 
Metropolitan Ed i ion Co 62/10/14 EDLES, J . DUCK. J H , KOHL, 



Atomic Safety and Lie Billing Appeal Panel 
Fichu 50-289,03/10/14,8210300033 



4pp 



157S7 304 



24X 



831O2COOOS, Order directing NRC to respond to UCB B21007 motion, 
c hjrac tn icd ai reiponie to Board Notification BN-EJ2~93, 
that NfiC provide all document* re temitcale teit on feed b 
b I ead capabi 1 ity 
SHOEHAKEH, C. J Atomic Safety and Liccniing Appeal Panel 02/10/13 

Office of th* Executive Legal Director 3pp 1S7S3.20S 34X 
Fieho 30-209. B2/10/15, B210200006 



B21029O332 Corrft ted separate vieui of Cummi i s ionen TM Roberts & 
V Oilinsky on Order CLI-82-31 

ROBERT8.T M , OILINSKV. V Commi is i oner* 83/10/21 4pp 

15790 078 24X Fiche 80-209,03/10/21,0310250325 

B2 103404 3 3 Decision AC.AB~j,9S affirming ASLB deemon not to require 
predistributl on of permanent record doiim*ttri (, modifyinfl 
decision on ern*rqenc-y mupport director 

SHOEMAKER, C J Atomic Safety and Liceniing Appeal Panel S2/10/22 
67pp 1980S 323 SAX Fiche SO-SBt, 02/10/22, J 



6210260449 Dsciiioii ALAQ-&97 affirming ASLB decltioni or emergencij 
planning u/condition that Commanuiral t h of PA agricultural 
info brochure be given to farmer* in (0-mile plum* eipO'iure 
emergency planning ion* 

SHOEHAKER.C J Atomic Safety and Licensing Ajipsal Panel BSJ IQ/22 
SOpp 15307, OS'S 24X Fich* 5O-2B9. 62 /IO/22, B21O36011? 

B210204fia Order CLI-B2-32 advising that ASLAD ihould not be conctrnud 
about current Bfc-atui of compliance ui/restart raqui r ementi 
Proceeding ihould determine n*c stsarij actioni to protect 
public t prograis of long-term ittmi 

CHILK, B J Office of the Secretrartf of fane CommistiDn 02/1O/22 
Atomic Safety anif Licanung Appeal Panel 4pp 1 9B06 224 3 -IX 

Fiche 50-289. B2/10/S2, aS!O2iO46B 

B210270090 Reiponie to ASLAB 021015 order UCS rque*t *or relief in 
B21O07 reiponte to Board Notification BN-B3-<)3 should be 
denied All document* MRC consider! relevant & matl re 
Semitcaie tev ts lerved on UCS 

RAUEON. R J Hxring Branch 4 B2/1O/25 lOpp 15015 302 H4X 
FichB SO-HB 1 ?. 82/10/2S, 3210370090 

B21O27O093 Affidavit aP BU Bheron ! WL Jensen re Semiscalc S-SH-2 
reiulti Tet t rufiult* do not raise significant safety isiuai 
do not nhibit any neu phenomena It can be adequately 
predicted by lifting computer codet W/Cert if ica ta of Svc 
EHERDN, D 14 , JENSEN, W L Reactor Sgitams Branch 02/10/33 43pp 
19815 311 34X Ficha SO-ES?, B2/10/23. 031027009O 



Order otending time until 831022 for CommiiBion to act to 
review ALAB-AB3 

CHILK.B J Office of the Secretaru of tha Comralstion 82/10/15 
CommiHiionen Ip 15753 SI I 24X Fiche 50-299,88/10/19, 
3210200011. 

SSI OH 1037 B Ad vim that author ui 11 repreient Commonwealth of PA at 
821 IO9 oral preientationi before Comminion. Svc list end 
ADLER.fi M Psnntijlvania, 5Ute of 82/10/18 CHILK, B J Office of 
thw Secrataru of the CommlBtlon, 3pp 13763 147 24X 
F icha. 50-289, B2/10/1H, B210H10378 

e2lO2Q400 AdvUei that NO Aamodt ulll repreienl; Aamodt family at 
O21I09 o-ral preientations in Harri*burg,PA 

AAHDDT. H M Aamadti, The 82/10/17 CHILK. S J. Office of the 
Secretary of the Commission IP 19803, 103 21 X 
Fiche 50-289, 82/10/19,8210260400 

831O21Q374 Notifies that licensee will appear at 881109 public hearing 
to make presentation d respond to queftloni re restart 
Licansve etpect* to reierve portion of time for rebuttal of 
other preientationi Svc Hit end 

TRQUBfllDQE, F Shay, Ptttman, Pottc & Trnubrldge TRQWBRIDOEiO F 
Kebropolttan Edi*on Co 82/10/20, PALLADINO.N J . OILIN8KY, V . 
AHEARNE, J F. Commisiionari 4pp, 19762 014 24 X 
Flche 30-aa 1 ?, 82/10/20,8210210374 



B210SB0250 Confirms B2IO25 telcon in which Docketing b Bvc Drancli 
agreed to add name to ivc liitiai counsel far Iti deni-gnated 
Individuali D & W Related correipondence 

KCBRIDE.H F, LeDueuf, Lama. Leiby & K*cRdi 93/10/35 DoeltBtinn 

(, Service! Branch Ip 1 5837 O50 24X Fiche 50-2B9, BP/JO/aD, 
8210280250 

B2I0200360 Reply opposing UCS 021OO7 responie to Board Notification 
82-93 re Sunlit* la tetts of f**d ti blcod & motion that 
ASLB direct NRC to prqvide documentation Feed it ble-ed 
cap*clfey not eBiential to operation W/Cei- 1 i f j cate of Bvc 
BAXTER, T A Matropo 1 1 6an Edit on Co BAXTER, T A Sham, Pittmun, 
Potts b Troubridge, B3/10/2S Atomic Safety and Licensing Boar4 

Panel 9pp 1&B49 146 24X FicJia-SO-aa 1 ?, B3/ 10^25. 821 OHB0360 

B2102B02fi5 Ordur allocating time for presentation of oral arguments on 
imiiedidte ef f >ctlvenei of ASLB B2O7E7 & 811214 partial 
initial decisions Iisgei to be discussed in detail lilted 
CHILK, S J Office of th Secretary of the Commission B2/10/37 
2pp. 15837.312 24 X Fiche 30-389, 02/ 10/27, B210SB0263 



Bal0StG493 Order eitablishing arrangementi for 821109 meetings In 
K*rr 1 ibura> PA r* restart 

CHILK.B J Office of the Secretary of the Commission. 82/10/20. 
3pf 15762.89? 24X Flch- 50-889, 82/10/20, 8210210493, 



8210220443 Advises that JM Cutchlng.JR Goldberg t, Jfi Or* will 
rB-p-rc*.>nt HRC at oral argumint on whether to lift 
I immediately effective shutdown orders In vieu of ASLB 
B207S7 ti B1IS14 partial initial decisions. 

GttAVrJ.R. Kearing Branch 4. 82/10/20 CHILK, S J Office of the 
Secretary of the Commission Ip. 1977B 33B 24 X 
FJchei a-O-SBt, 82/10/20, BS10220449. 



93102204^5 Advise* that author mill represent UCB at B21107 oral 
tirgi/ment Certificate of Eve encl 

WEJ8S.E R Harmon & Heii., MEIBS.E. fi Union of Concerned 
Scientists. 82/10/80 PALLADINO.N, J , AHEAHNE, J, , OILINSKY, V. 
ConmivsiDneri 4pp 19779: 121 24X Fiche: 30-289, 32/10/30, 
0210320443- 



B21O25O329 Foruard* Commi si loners TH Robert* fc V QUinikij corrected 
npjrat* viius on Order CLI-S2-31 

STUCKV-S M. Docketing & Services Branch. 08/10/21 Office of the 

Excutiv Leg*l Director. Ip, 13790.077. 24X Fiche 50-2B9, 
02/10/21,8210290329 



DOCKETED ITEMS 



6210070440 Pe,p Q nd* to 620935 ! tr transiting constitu.nl JB HUF* 
330310 inquiri, re restart Chances ade a* r.ault of reopenad 
nraceedlngs uill satisfy conta-m* 

DIRCK5 H J Office of the Emeutive airactor For Operation* 
33/0-5/16 SPECTEfl.A Senate 4pp 13649 2-34 24X 
Fiche 50-299. a2/0?/!6. H21007O44O 

Request* response to constituent JB Hurst Q20B10 Inquiries 



NRC - Ho Deta.led 
24* F>ch. 50-2B9, EJ2/0*/! fe, S210070440 



aat031050l Respond to constituent J Doroshou 930025 Itr r* ASLU 
Bitial initial decision on cheating TM1 Alert Jileo 
eitflptlons to dcision presented vl eius on re*tart to 

DIRCKS, U J Office of the Efetutive Director for Operation* 
B2/09/2 1 ? SPECTER, A Semti 9(p 157B2 266 24X 
Pith* go-as?, aa/09/a 1 ?. saioaiosoi 

S2H0350015 Re. ponds to cunstitufrnt J Doi-oiTnau 030820 Uf re ASUD 330727 
partial initial decision Commission U now deciding rut act 

DIHCKS.w J Office of the Executive DiriKtor far Operations 
B2/09/2 1 ? PRdXMIflE.U Senat* 7pp 1 5SOQ 126 24X 
Fiche 50-239.82/09/29.9210250015 

ratnr- eam cheating must be 



,S!r lr T" 5 HU. d I.l,nl *Urt S2/10/83 PALL^WO.N J , 
CILINSKY, V . AHEARNG, J F Commi stloner I 2pp 15037 042 BtX 



Opinf-s that n""tlon 

r lr T" 5 HU. d I.l,nl 

V . AHEARNG, J F Com 

50-269, B2/10/2S, B2102B033A 

J Insurance & indemnity lnForma*10-n 



ai0150U7 Forward* Endorsements 53 fc 54 tg MAELU Policy HF-73 t 
Endorsements 1 ft i2 to NEUIA PoliCV NF-330 

OERETV, H F OenBTal Public Utilities - QPU Service Corp. B2/10/07 
SALT Z MAM, J Antitrust * Economic analysis flrjncli lUtlUtg Finaneel 
5pp 15i,9/ 359 2flX Flche 50-289, BE/10/07. B213IS0147 



O AdviSQpy Commit tn on Reactor SaFegtiardi repnrts t coiTBapon dnnc 

9310090015 Addl i-BSoonso t" FD1A raqyest for 19 categories of Info vo 
nuclear reactor fvents k saFetu problem Foi-wards documents 
llstaa in App A Document* In rtpp D complote 1 a withheld (ref 
FOIA Sierantlon 9) , 

FtLTOH, J H Division of F!uli and Httord* H3/O7/I2 UDELL, R rt 
CTiftical Mass Energy Project 9pp 15663 097 24X 
Fiche 50-O 



--0aiOOS0051 Forwards Gsnaral PutHc Utils 020*07 Ncuif (loltase 43- 
discussing sutpBitorf cause of TMI-1 *t""i fenerator tube 
degradation prnh l4n fc prDpaed repairs Repair* estimated 
to DC completed bij act 1982 

MAJOR, ft ACRB - AiCvl.stiry Committee an Reactor Baf()uardi 
63/04/20 KDECLERtD W ACRS - Adylsorij Committee on Reactor 
Safeguard* SpP 15665 157 24* FlchB 50-000, &2/07/1S, 
9210030015 

U2I0270-)10 summary of ACR3 Sifbtomniittee on He tal Component! 620407 
moBtino tn Palo Alto.CA re status of Steam 0nar*tor 
ouinert group progT^m & THI-l iteam generatDr problimt t- 
mods 

* ACttS -~ Advisory Camffllttee an Reactor Ssft9uar<ll 85/08/11 
ACRB - Advisory Comml tt*e on Reactor Safeguards 9pp 15B33 2A 
S^X FichB 50-289, 33/OFJ/ 1 1 , B210E70410 



licence stag* document! fc coTr*ipcindBnct 



iift-lj evaluation ra mad 
d to inadvertent 

' o*s of 

mntalian pauir 
MICHL30tg,C Dlrctor' 



B1071B047B FoMjjrdi safoty val"ation re mod to correct ln*dvirlF I 
opening of tnai|iheric dump valvas on DWR plant* during Jell 
of initrum*nt control iy non-nuclear initTumentatlon 
paiuer 

OaWSTEfH.H Director'* Office 81/09/04 MICJtEiLenn. C 
Director'* Office 2pp 1373O B30 B4X Flche 50-000, B3/0*'*! 

sal oo 10008 



Addl response to FOIA rsquast for 19 cHttgorlti ct k r Ft n 
nuclear rejctor eventi fc safety problem* Foruiirdt dccuntnli 
Hsteri in rtpp A Documents tn App H completely niltNhtld lr*t 
FOIA Eiamptton 5> 

FELTDN, J M DlvUlon of Rules and Record* 02/07/12 V[il I- * 
Critical Masi Enerjy Project 9pn 1 5663 > 02? 34!( 
Fich* 50-000. B2/07/12.02100B001 5 

9304300536 Foruirdi std order for DDE work "Eva 1 mtl an of T11-1 ''j 
Oeflerotur Corroion " 

VDLLMER.fi H. Division of Engineering. FIN n-?3(jfl QlSfH/:-3 
FRMLINO,A Enerny. Oept of 2pp 15463,137 B* 
Fichi 50-000, 62/07/12(0310080015 

Bao-l?0014a Btd order for DOE work' "Evaluation of IMI I tin** in""", 
CorrDiJun." Isiued to BNWL 

VOULMER.R H Division of Engineering FIN D -3504 y W.O*' * 
Ip ISAiS 13B 3-VX Fiche SO-000, 08/07/1 a. 



-QP04290237 Di icu)s info available re unit fleam gent'* tar t Tr, 
reptst itatui updates ti notebooks Of Info on tuh 
f atrrica tloh , identl f icat Ion b operating history tut I W/<J 

KOVAK. T H Atsiitant Director for Licensing 03/04/01 
EISENHUT, D Division of Licensing app ISjbiB 3JI 7*1 
Fiche &0-000,fl2/07/12.B210000015 

-8303230533 Hecomnendfl formal revieui of fac i 1 1 ti| stain fenirit,r 
corrosion problem, Detsi led Jlscuirton of ratianalt for 
request Bite 1 

JOHN S TON, H V Anistant Director for Mator-lal* I, U-jillfiH l*t ' 
Engineerini 32/09/19 NQvAK. T Asilvtant Director ar C(i'<- 
Reactnrs Spp 13669' 146 24X Fiche, 90-000.1 



eaOfiI40339 Dlicuisii facility iteam sontfrator- tube nv(* i *>i-J< 
liconiae to- diicuo details of procedures In bt follovtt 
proposed NftC mill develop complimentary i nit>peni)ir>t pncfrj* 
Intend'ed to verify repair pracai. 

MOVAW. f H Assistant Director for Operating llMdcri Gltto .< 
E1BENHUT. D Division of Licensing 2pp iSfcfcJ JS? *** 
Flchi SO-000. BS/07/12,B21(X)BOOlg, 

B20f>2906i6 Defines Div of Englnaarlnfl reppnlbl I liln fc ifiit'Nn 
tisure efficient d high quality revteu of llctnitt p*cp**el 
for rpairtna Tfll teem generator tube, 
VDLLMERjR H Divltlon of Enj)lne.>rtng B2/06/H 
Atslttant Director for Materials !> Qual iMotlans 
KN1OHT. J P Assistant Director for Compo nenll h (UnU'l 
Englnaarlng. Spp 19666. 132. 24X Flch* BO-000. ift)Jt\ t 
B5IOOQ0019, 



Foruards std order for DDE uiorki "Evolunli 
Qtntraiofi " (nud to BNWL period of ferformmct u 
to 921015 U/na ddl cott U NRC 

VDULMER.R, H, Diviiion of Engineering, FIN 8-2306 
FREMLIN0.A En*rgy> D.pt, of. lp. 

FUH- Ho-ooo, 82/07/12, aaioosoois 



B21403007& gtd order for DDE work "Evaluation of 1HJ I 
Oeneraton " IssUld to BNWL, 

VDULHER.H.H. Diviion of Enfllneering. PIN H-3M6 3 
lp 1S666.IB1, 24 X Fiche: SO-000, 02/07/lS, B3100WWI9 



of dacumanti re 



I2/06/2S (JDELU.fi. A 
19 24X 



HJ 



ffacommendi approval of deferral of l|l*flinliH*=i ft 
WfiEQ-0737, Items II B 3. II F, 1. 4, II F 1.3 & II F I <& vMll 
63O33J or b*for restart. Approval of Item II B B 3 IJiUvlJ 
be ufthfield until revleui completion, 

DIRCKS-U J. Office of the Executive Director for Dir*l|f 
7pp 15624033, 24 X Flcht M-B99.Da/0*y li.fej t Xs. 



6210050920 Inform* that Commit* Ion y{ll be brlffid n H 
rteomniBndationt re reitrt certification In Mr Eijl j,^j 
prior to Commission decision on ef f ectivontll of <MilB 
Initial dicltlon, 

DIRCKBrH J. Office of the ElKcutive Director far Oj4Ml B , 
02/03/IX PAUAD1NO.W. J Cummittionir*, lp 
Fleht.SO-299,B2/09/16,fl21003030A 



ng re reactor yatar lavoX 
tv to mil 

iquireunnti for 

ICHELBON.C Dii-etor' 
t, aa/06/2S. 92100 1 QQQB 



BZ10050336 Inform* that package re facility rimrl i% n ( 
Ccnnliiftfi for approval of change in MUREQ-0737 f|lt II 
boron precipitation problem affect* confarfftnce 
w/regulafctonii deferral amount* to exemption 
HCIMTQ.J Office of the Eieeutlv* L*oa] Olrfciar 
EI6ENHUT,D. 0, DivI.iOn of Llcenitng 4pp. 
Fi<h: 80-289- 82/0^/U. B210030306 



DOCKETED ITEMS 



99 



B20705GG4O Requests NUREQ-0737 requirement deferrals be addressed as 
outlined In Commission 010335 order Paper distunes staff 
plant far certifying completion of restart requirements on 
5ECY-B2-230 t. describes approach to be taken on NUREG-0737 
PALLABINO. N J Commissioners B2/O7/27 DIRCKS, W J Office of 
the Eiecutive Director for Operations Ip Available at NRC 
lire 15624 043 24 X Flche 50-209, 82/09/ 16, S2100505Ofi 



9210130548 Forwards Rctvition 1 to "TMI-1 Bteam Oanerator Repair Safety 
Evaluation, " submitted on B2Q82O at suppl to LER 91-13 
Revision* tfo not affoct previous conclusion! Hnvislon 
withheld (ref 10CFR2 790> 

HUKILL.H D Oeneral Public Utilities - BPU Service Corp. B2/1Q/O5 
EISENHUT.D 8 Division of Licensing Ip 13494 195 24X 
Fiche 50-289, 62/10/05.6210130540 



8310210503 Provide* Commission id/status of implementation of NUHEO-0737 
requirements on tMI-1 Recommend s deferral of Implementation 
dates lor MUREQ-0737, Item* II D 3, 1 1 F 1 4, 1 1 F 1 3 & 
11 F 1 i until 830331 or before restart 

DJRCKS.U J Office of the Eiecutive Director for Operations 
5ECV-BS-3B4 02/09/16 14pp 1 57B3 283 SAX Fiche 50-2B9, 
02/09/14.. 9210210503 



821029014.2 Not! f (cation of date c Jiang e for 921018-19 noebings ui/ifHl t. 
consultants in Getheedi. MD to d iscuss remits of it cam 
generator repair qua 1 i f 1 cot ion progr m. ed du current te-sting 
program & RGB cleaning 

JACOBS. H H Operating Ruactors Branch 4 S2/1O/05- BTOLZ, J F 
Operating Reactors Branch 4 Ip 15Q7A 329 4)! 
Fiche 30-29^fi2/10/OS. 6210270163 



821OOE0113 raruards outline of Phase 1 ventilation separation program 
to mart short-term intent of ASLD 811214 order Program 
completed ! s ij j turned over to plant operations Further 
detail* discussed in restart rept, Suppl 1, Part 2 

KIMILL..H D General Public Utilities - GPU Service Corp 82/09/29 
SFOLZ.J F Operating Reactors Branch 4 4pp 1S6O3 257 24X 
Fiche 50-2B9. 82/09/29,8310030113 

6MQQ5019i Forwards table listing 96 emergency feeduater sgs/ln strument 
air valves as suppi to 320714 1 tr valves structurally t, 



operationally adequate during SSE stresses & normal loads 
HUKILL.H Oeneral Public Utilities - GPU Service Corp 
STDLZ.J F Operating Reactors Branch 4 2pp 15&09 292 
Fiche 50-289.02/09/29,8210050196 



82/09/29 
2 -IX 



S21QO70372 Advises that util has contracted ui/Elec tronic Asoc i ates, Inc 
for basic principles trainer Contracted date of delivery is 
Dec t<9B2 

HUKILL.H Oeneral Public Utilities - GPU Service Corp B2/09/29 
SrOLZ.J F Operating Reactors Branch 4 Ip 15633 317 SIX 
FicUe 50-299.82/07/29,8210070372 

B2I01E0043 Notification at 82IO13-14 meeting ui/PNL, OHNL. Frank 1 i n 
Researth Ctr. OH State t util In Bethesda, MD to review status 
of steam generator recovery program 

JACCmB.R H Operating Reactor* Branch 4 02/09/29 STOL7- J F 
Operating Reactors Branch 4 2pp 15499 205 24X 
Fiche 50-28-?. 92/09/39.8210120043 

B2IOI3Q20a Forward i application to amend License DPR-50 consisting of 
Tech Spec Change Request UBideletlng rtpp B Tech Speci 
HUKILL.H D Oeneral Public Utilities - GPU Service Corp 83/09/30 
STOLZ. J F Operating Reactors Branch 4 Ip 15674 127 24 X 
Fiche 50-289. 82/07/30. B2I0130206 



3210270342 Clarifies request far addl info re TM! I Urn It B 3, "Poxt- 
Accldent Sampling Sys " 

STOLZ, J F Operating Reactors Branch 4. 82/1O/07 MJK1LL, H D 
General Public Utilities - CPU Service Corp 5pp 13931 319. 34X 
Flche SO-HB9. 92/10/07- S21027034B 

92102203:49 Staff requirement! mamo re BS1OO& briefing on ttatui of 
certification of licet! see compliance m/reitart requirement* 
CKILK. 3 J Office of the Efrcretaru of the Commnsitn S2/10/12 
Office of the Beere&ary of the Commi talon Ip 15766 210 3*X 
Fiche SO-E09, 92/10/12,0210220349 

821O25Q092 Faruirdi operational DA plan far facilltiei 

FIEDLER, P B Oeneral Public Utilities - SPU Service Corp B2/10/13 

CHUTCHFIELD. D Operating Reactor) Branch 9 2pp 13792 265 24 K 
Fiche BO-000, Ba/10/12, BS1D250092 

8210250097 Operational OA plan for facilities 

KAYANAS.W C , LONO, R L , HLIKtLL.H D Ooneral Public Utilitios - 
OPU Service Oprp IOOO-PLM-7BOO Ol ROO B2/O9/O1 ISOpp 
I57TO 26? 24X Fiche 80-000^02/10/12,9210250093 

aaiO270QS Forwards docirments to be placed in PDR. Documents respond to 
NRDC b Sierra Club 820917 third request far production of 
documents b Sierra Club 37th et of Interrogator lei, 
SHEENEV.MF Offics itf the E*ecuiive Legal Director B3/iQ/33 
SCOTTiS Document Management Branch 4pp, 15G19 092 24 X 
Fiche 3O-000. 93/10/SS. 821O27O01 9 

6210270020 "Greater Commitment Needed to Solve Continuing Problems a 
TMIj " rept to CongveiH 

* QBrieral Accounting Office, EHD-91-106 Bl /OB/26 122pj> 
18810-096 24X Fiche' BO-OOO, aa/ 10/82. B21 0370013 



-821OI3O21O Application to amend License DPR-50 consisting of Tech Bpnc 
Change Request HBrdeletlng App D Tech Specs Justification 
enct 

HUKILL.H D Oeneral Public Utilities - OPU Service Corn 
62/O9/30 3pp 15674 128 24X Fiche 50-2B9, S2/09/30i B210 13020i 



Foruard* "AssB*sment of Selected TMI-1 Training PTogramSj" 
Vol I Rcpt concludes that util has made significant progress 
In past 3 yri to expand TMI training capability & to improve 
quality of training programs 

ARNDLD.R C Oeneral Public Utilities - OPU Service Carp B2/10/OI, 
OENFON, H R Office of Nuclear Reactor Regulation. Director Ip 
O20 24X Fiche 30-289, B2/10/01 , B210060342 



B51O290204 Foruards summary itatui rept for item* needing NRC 
certification prior to restart. per 7 90S 09 order tt notCc* of 
hearing. Date of equlvalant timing for verification ulll ha 
provided in future statu* aummaries 

AHNOLOiR C Oenral Public Utilities - OPU Service Corp 
DEN TON. H R Off Us o-F Nuclear Reactor fUgulatian. Director 3pf 
19B53 293 K4X Fiche 3O-287, BZ/lO/SEli 8210290ZO4 

Inspection report*. IE Bulletins b c orreipondenca 

B2100B0015 Addl response to FOIA request far 17 categories of info re 



-821006G3'S "Assessment of Selected TMI-1 Training Programs," Vol 1 
v Data Deitgn Laboratories 82/09/10 301pp 15A18 021 24X 
Fiche 50-289,82/10/01, 8210060342 



9210030043 Foruards status rept re procurement b installation of 
replica ilmu 1 atop, per B20B27 mg t piping fc instrumental ion 
diagrams Second status rept mill be provided in Oct 1993 
HUKILL.H D Oeneral Public Utilities - OPU Service Corp B2/10/04 
STQLZ<J F Operating Reactors Branch 4 3pp 19643 281 24X 
Fich 50-239,82/10/04,8210080043 



331(30003 OB Poruarifs first status rtpt re procurement t. installation of 
replic* simulator for TMI-l.per requirements of Paragraph 
593 (3) of 610827 mgt P1D Next status rept mill be provided 
in Oct 1983 

HUKILL.H D general Public Utilities - OPU Service Corp B2/10/04. 
STTJLZrJ F, Operating Reaction Branch 4 3pp 15A3fl'044 E4X 
Fiche 50-269. 82/10/04. 82100B030B 



S31013024S Advises of dairij farm located appro* 1.1 mile* east of TMI 
yielding dose commitment greater than six of seven present 
milk sampling stations Results of land census to be included 
In 030301 annual radiological environ operating rept 
HUX1LL.H D Qeneral Public Utilities - OPU Service Corp B2/10/04, 
HAVNES.fi C Region 1, Office of Director Ip 1S676 OOS SIX 
Rich* 30-2B9i 92/10/O4, BZ1013024B 



100 



DOCKETED ITEMS 



621013032! ForwiMl* IE Insp Rep-t 50-299/62-13 on BBQBOB-05. 31 6 
09(31-03 Ho noncompJ Jnce noted 

STAROSTECKI.R Division of Project t, Rutdent Pi-oormt S2/ ID/01 
HLJUILL.H D Oeri*r*l Public Iftilitlei - CPU Servlet Corp 2p? 
18703 ZIB 24X FUhe 50-2S9. B2-/ 10/01. 82101.S022I 



--S210070135 Btvil rept input re Qinna B201S5 steain atngTat 
ruptur. event NRC loth monthlg status rept t Cenri 
THt-l restart end sre* 

* MSC - No Detailed Affiliation Given 82/03/11 3 OB 
IS645 IKS 24X Fiche 90-000, 82/OS/ 10,6310070007 



In. 



8210130232 IE line- Rp t 50-289 /Sa-V3 on 92OBOB-05, 31 t> 0901-03 
Mo noncomnl iance noted Major areas Inspected actions an 
pi-flout Into f Indln9i> rrac tor blilg flood ltv*l limitations 
plant shielding daiign revleu b restart modl-lnipletnentatiQn 
HAVERHAMP, D , EflPEN. P . FABftNQ, A Division of Project t Resident 
Program 92/10/01 BOpp 15709 314 34V Flehe 50-239.93/10/01, 
3210130221 

6210130202 Clarifies poiition re Action 4 of IE Bulletin 77-21, "Temp 
Effecti on Ltvl Hiasurefflents " [tieluiion of tablet, curvet 
or curl-action fact on in omergeneij praodurei will 
unntt Kir i IY com plicate procedure* 

HUH ILL. H D General Public Uti 11 tin - flPU Sir vice Carp 02 / 10/04 
HAVWE3, R.C Region 1, Office of Director S f p 15701 334. 24 X 
Fithe 80-239. 92/10/04, 8210IS02Q2 

82 mi 50076 Notifies that 820929 IE Imp Rent 50-aB9/B2-V4 un tubmitteiJ 
u/Brroneou* Imp Ript Number B2-12 

STAROSTECWI.R Civilian of Praject t, Rt*itfnt Projrarm ea/10/OS 
HUK.ILL,H D Oanirnit Public Utllitlit - OPU Sirvici Corp lo 
13696 339 34X Fie h e, 30-237, BS/10/OS. B2101 50076 



B2102604 1 ? 1 ? Poruarili Rvlinn 1 to "Efflutnt !, Haiti DitODt*! 
Semiannual Repti Jan-June I1B2 " Revision reflocti change in 
F-SS batch mode 'or jacond quarter 

HUILL,H B CJeniral Public Utilifciet - GPU Service Corn fi>n- 
HAVWES.S C Region I, Offlc. of Director In IBGOA \ -,,. ,,, 
Fisht 50-S39. B2/IO/1S, 831Q36QW} ' 

921034,0605 ReviliOn I to "Effluent & Waite Di*po,,1 Seml.nnuili 
Jan-./un 1902 " *r,nujr t f 

* Gsitirtl Public Uttlltttt - OPU Service Corp B2/IG/15 , 
ISQOi 137 24X Fiche 30-2B9, Q2/1O/ IS, 631 024,0199 ' 

S ReportAbl* occurrinoir LERt t r*lated corre*pondtnc 



UML1 t 



a pond, to FDIA r E o.uet for 19 ctegon, o f 
nuclear i-*etor ivents fc liifttij ppohlemi ForiuaTdt dnEu 
lUted In App ft o EU 

FELTCM. J M Division oF Rulei and Recordt B3VQ&/3Q 
Critical Wn Energy Project I5pp 1572? OOfl B4X 
Fie hi 30-000-8a/06/aB,B2100IQOOB 



9210150083 Forwanji IE Imp Rept 50-2B9/ea-14 nn BaOB07-007 No 
nunc omp Hinct noted. 

BTAH03TECI,B Division at Projict bRxldint Prosrami 02/09/S9 
HUKIUL.H D, Oenaral Public UtUltlit - OPU Btrvict Corp 2pp 
^10 a Fich*'30-289,SZ/10/OS.Bai0150074 



B210150091 IE Imp Rept 30-289/32-14 on 8SQB07-0907 Ho noncomplianee 
noted Major *reai ini|iitt*(I plant opfrafciom Including, itiam 
aenerator rtp-alrl It restii-t nods 

CONTE, R j VQUHO.F , F AS AN 0. ft Division of Project Si Resident 
Pro.]ram S3/09/2t ipp IStfi 342 24X Fich 30-SB9, 92/10/03, 
0310130074 

B2 10210052 Faruardl IE Imp Ript 50-269/82-111 on BB0907-10 Mo 
noncompl lance notrd 

MARTINET T Division of Enolnetrlnu t Tehni<*l Pi'oprJmi S2/ltW03 
HMAtLU.H D 0ns-al T-jtlic Utilities - OPU Sirvkt Corp Bop 
15762 018 24X Fichs' 50-289. B2/10/03iS210210U52 



RBcommBnda compreheniive antia ra ent of plajit agr*t, 

condition* to determine specific predetermined tiff,* re3tttl 
nquences of occurrsnce to emeroency husei SRP ihojjd b 
rvsEo" r detign feature* 

ASHE.F Director's Office, 01/10/16 MJCHELSQN.C 
Office 4pp 15731 04? B4X Flche &0-000. 



Qlr 



S210130SIS Foruardi LEU B3-013/03L-0 

HUKILL.H G Central Public Utilities - OPU Service COT-* H - 
HAYNES, R C Region 1, Office of Director In (BARS aw .* 
Fiche SO-aB7, 82/07/29,631013031 S * " 

-BE1G130S26 LEU 92-013/Q3L-0 on B20H30, plant of Fluent r*dj.*,t 
(RM-L-7J had no sample flow Caused bij open braaker on iHtt} f 
pufnp BR-P-1 Breaker closei] Operator survelllanie pr^are* 
continued to ensure proper tloui 

Oenerel Public Utilities - OPU OTV*C. CDJJ 
egion 1. Office of Director 2nc I3/f\a an 



8TEPHEN90N! C J 



Flchf , 50-239, 82/09/29,881013031 5 



B21021005& IE Imp Rgpt 50-269/62-16 on Q20907-10 No nancomn llancW 
noted Major areas Inspectid Ucensie action re THI Item 
I C 7 on feedback of opiratlng experience b Item 1 C 6 on 
verification of testing It n*tnt *ctlyiHis 

HEVR.O M i CAPHTON, D. L Blvlsion of Enjinearinj t. TecfcnicaJ 
Proframi 82/07/39 6p[> 18762 020 H4X Ftehe' 10-2B9J B2/1Q/O5, 
8210210092 



B210070345 PhfD-THI-B2-020 on Q2100B- game poai hr ippr* htnait 
prnpertu d turned over to state police k 0m Commit,* joii No 
vital ras threateneJ Security increased Litins ut I I 

WIEBE.O , BELLrtMYrR Region 1, Office of Director 
30& 34X Flch* 30~289, B2/10/06, 8210070269 



B20S190233 IE Info NotH:* 80-33, Buppl I, >'L*kir B (, Dltlodj|d 1-125 
Implant Seed*. " Bvc list encl. 

CQB3, 1, r Division of Fuel Facilities, Materials t Safeguards 
82/IO/0& Conlolidetkd Edlion Co af Htu Yorl ifcpn 15741,390 

S4iC Fit(i 50-000, 



IE Bulletin 62-03, "atnsi Corrosion Creekino lh Thick- 
WalljLai-ne-DlannteriStainUst Steel, Reclrculatlan Syi 
Piping *t BMR Plants " Svc list encl 

OEVOVMO.R C D(retcr'i Office. Office of Impec tlmt and 
Fnforcament B2/10/14. Consolidated Edion Co &f Htu York. 

nspp isato.ias B4.X Fiche so-ooo, 92/10/14,8200170233 

S2H3a<?OOii8 Fopyr-d IE Insp Hept 50-839/65-10 an B20920-24 No 
noncompl lance no ted. 

H 5fJI, N : T ,, T ;, Dltfillon of Enilnitring i. Tichnltal Progr*ni, 92/10/13 
HUhlLL.H D. general Public; Otllltlei - OPU Service COT>O 2pp 
13983,342, 24X FicKe SO-2B9, B2/10/1S, B210S9006B 

6210290072 IE I n sp fl.pt 80-289/83-18 or, 820980-2* H noncftmp Hanee 
notd riajftp areas [nipec tta- licensii action on prtviom 
in*p Itent, prmce-ifuree t, repreientaUve record* & Intel-view* 
ir/per tunnel 

HMW.r , MrtPyOA.fl , CrtPHrON, D L, Division of Englnetrlng t, 
Ttchnical Program Ba/10/OB Iftpo 13933 344 34* 
Ficti* 50-289, B2/10/lS,aai029006 

R __Pf'oJ ( -= "r6ing ripc-rfc* tt rtUted corripandenc.e 

8210070007 Ritpondi to FOM qii*st for fight cetegorUs of r.c orot re 
""i n : ?i'" n 1 ' ***f" *wk*"-*PP * Joeum.nt, erovidtil 
FOIA Hi^uetb 81-313, Forward, < CLi n t, lit.d In 



ft 



B 



, Division of FUjl,, , n(t ft 
Wlnthtop, atieiion, Potnm ii Ottberts. 
Fiche- BO-000, BS/&B/10, Sai0070007 



9pn 



62/08/10- 



LOriO, 0, 
S4S 



B2102604B3 PNO-1-B2-047 on 631022, k Intt U einanel 
rou of tubei i n D once-through steam generator 
involves controllerf detonation within tube Horn* 
attention eipectod 

CONIE.R , UeiHIO.R , BTAHOBTecKI.R Region 1. 
83/10/22 If, 13B06 233 84X Flchi 90-2B9. 



cond ur t,j.i 



c * Sll , 

, B2IMI* 



T Hearing trinstrlpts on non-*nti trust mattari 

8210130075 Foruiei-di Commission determination statement uttktiH 
tranecrtpt of B20910 restert proceeding " 

CHICK. B J Office of the Becret*rg of tha Commission S3' 
Public Oocuinint Branch to |3i<?6 250, 84X Flcht -sb-seS.K 

0210130007 Commission determination ul thhul dida tr*nterl.L 4 
Commision B20910 dltcutilon of Contested Uiu i i n rl ,,tir 
proceedlnj "'*' 

CHIUK.B J Office of the Secretary of the Coi*|ei er F3 
If 19i.94iasi 24X Fiche SO-B89, S2/09/3B, BB10I 3>Jo75 

B210a70tB8 Trantcrlpt of 82100A public meeting re tt*t ut * 1 

cerfctjlcation an licensee compliance u/ratft raulr. H i: 
on THI-l in HMhinaton.DC.Pp 1-34 MiWMn 

* CafumUilonerl B3/10/06 34pp 1UB3B 276 3*y 
FUh.&0-aa9, 83/10/06.8210270100, 

6210210420 Forwards transcript of Commlision 831&J4 nt ,,. t 
ve.isl ui*t*r level indicator program Comnrntt holrf b, 
iiibmittta ni| B211Q1 

CHILK.B J. Office of th* 8ecretar V at tb> Cem.i.J-ft ' 
Off le*> of the Executive Legal Director, |p, 157A? ? 3 J 
Flehe.BO-aa9.B2/10/lB.B21oai0428 * 



DOCKETED ITEMS 



101 



H2LO21O434 Transcript of 821014 public meeting in Wash ing ton, DC Pp 
1-91 Vieugrapha re request For NJ?C approval of 

rpcannendat ions for implementation of NUREG-0737, I tern II F 2 
end 

< Commiss i oners B2/ 10/1-1 91 PP 15763 273 34 X 
Fuhe 50-269,82/10/15 5210210130 



.^ET 50-E93 PILGRIM NUCLEAR POWER STATION, UNIT i 

Operating license stage documents >< correspondence 



S-1009C015 Addl response to FOIA request for 19 categories of infn r 
nuclear r*actgr events i satety problems Foruiards documents 
Intod in ftpp rt Documents in Afl p H completely withheld: (ref 
FQIA Eiemjitian 5) 

FELTDIJ, J M Division of Rules and Retards 62/07/12 UDELL. R A 
Critical Mass Energy Project 9pp 15665 027 24X 
Fiche 5O-O30 ea/O7/13,82lOOBOOl5 



Forwards "Engineering Evaluation of Salt Svc Mater iit|s Fir 
Blockage at Pilgrim Nuclear Pouer Station bi; Blue Mussels 
fflytilus d 1 1 us ) " Further rec ommen da ti on s re sy s fduling by 
aquatic organism! not needed 

JMBRO.E V mrector 5 Office B2/O3/1B rUCHELSQN, C Dlrettor' 
Office 2pp 15h66 073 24* Fiche 5O-OOO, B2/O7/12, B2I008001 3 



Engineering Evaluation at Bait Svc Watar Syi Flou Ulockaoe 
at Pilgrim \uclear Pouer Station by Dluc Mussels <Mutllu5 
Ed t I us) " 

JMGRQ.E I' Director's Office 82/03/31 Mpp 15666 075 24X 

Fiche 50-000, 02/07/12, 8210080015 

- -USO5I3Q-I 1 1 Advises that engineering evaluation of saltwater sys 1 1 oui 
h-locka^e liu blue mussels indicates surveillanco lequircments 
in fet A Specs are not sufficient to demonstrate sys 
aperab i I i ty 

IKHELSCIN, C Director's Office 82/05/06 DENTQH, H It Office of 
Nuclear Reactor Regulation, Director 3pp 15666 O70 24X 
riche 50-000, 82/07/13.621 OOBOO 15 



Q Inspection reports. IE Bulletins Z< c o-rresp ondenc-e 

8204160212 Respond! to tJRC 9201 IS notice of violation b proposed 
impD*ition of civil penalties Corrective actions containment 
atrrvoipher ic control aya made fullij operable on B1O6O3 & 
procedure re por Formance of analyses being reviewed 
STASZESKY.F H Boston Edison Co B3/Q3/19 DEYDUN3, R C 
Director's Office, Office of Inspection and Enforcement llpp 

ISAM 275 24X Fiche) SO-293, B2/O3/1 1 ?, S2O4 1 60213 

6304160323 Foruiards performance improvement program in response to 
NRC 8S011B order modifying 1 I c ense. effec 1 1 ve imrne-d ia te lij 
Program details IB to 2'3-month nerioil that mill result 



HARRINGTON, H DJ Qastt 
I, Office of Director 
82/03/19, B201160313 



Edison Co S2/O3/1B HAVNES, Fl C HE 
3pp 15611 2B4 24X Fiche 5O-293, 



8204160225 "Performance Improvement Plan 
* Boston Edison Co 32/OD/OB I6pp 
Fiche 50-293, 32/03/19, 820-1160212 



15611 2B7 



B51OOBOO15 Addl responae to FOIA request far 19 categories of Info re 
nuclear reactor events 6 safety problems Foruards documents 
luted in App rt Documents in Ap p 3 completely withheld fref 
FQIA Exemption S) 

FEUTON,J M Division of Rules and Records 83/07/12 UDELL. R A 
Critical Mass Energy Project <?.pp 15665 O27 24X 

Flcho 50-000, B2/O7/13, B2100aoO15 



performance notes 
tOpp 



Systematic: assessment of licen 
facility evaluation for Aug-Oec I960 
^ NRC - No Detailed Affiliation Given 80/13/31 
154,68 025 34X Fiche 50-OOO, 82/Q7J 13. 931 00300 I & 



8210070377 ForiuaTfls IE Insp Rept 5O-293/32-33 nn B20B17-2O No 
none emp 1 ianca noted 
MftfmN, T T Division of Ensineenng < Technical Programs B3/Q9/2S 

HARRINOTDN.H D Boston Edison Co 2po I5&31 162 SIX 

Fiche 50-293. B2/09/22. B21 OO7O277 



Application For Proposed Change 82-11 to License DP 
c Ft a ft g i n>g Tecfi Speca 1 7 D I d 3 7 D 2 to permit operation 
in ! betuaen reactor nodes Linen isolation valve is 
inoperable 

nAfiftlllOTQW, W D Goston Edl5on Co S2/O9/30 VASBALLO, D u 
Operating Reactors Branch 2 2up 15615 044 24 X 
Firhe 5O -2v3. 82/09/30, B21O0600SO 



8210.070283 IE Insp Rept 50-293/63-23 on B20817-2D No noncnmp Uanco 
noted Major areas inspected licensee action on previous Insp 
f inding. f ol louup on IE Dulletin Bl-Ot surve 1 1 lane e of 
mechanical snub&crs & Cycle 6 p ost-pefuc I Ing startup tests 
PETHONE.C D BETTENFmUSEN, L Region J, Office of Director 
H2/09/09 7pp. I5i34 16-t 24X Fiche 50-293, 02/09/32, a?1007O277 



Proposed changes to Tech Specs 37DI&37D3 alloiuing 
aporation in ! oetueen reactor mode luhen isolation valve IB 
inoperable b satlsFijing CDnditions for primary containment 
integrity 

a fltston Ediion Co B2/09/30 lp 1561S 046 21X 
FK h f- 50-293, 82/09/30, 8210060080 



6210010373 Confirm* licensee actions taken in response to Revision 1 of 
performance improvement program discussed during 620924 mg t 
meeting Summary of areas needing clarification or 
corrvc tlons Bnc I 

HAYNES.R C Region 1. OFfite of Director B2/OW37 
HARRINQTON.y D Eos ton Edison CD 3pp 15573 097 24X 
Flthe 50-293,132/09/27.0310010373 



riO150144 Requests extension to submit Hark I containment program 
plant-unique analysis Delay due to need for eitensivu QA 
verification not previously Identified by Teledyne Corp 
t-artlSI.A V Boston Edison Co 82/10/03 VrtSBALLO, D D Operating 
Reactors Branch 2 lp 15705 005 24X Flclie 50-293, 92/10/OB. 
G21Q1SO144 



82I015DQ01 Foruards IE Insp Rept 80-393/32-22 on BBOB02-09Q6 1- notice 
o* violation 

STrtftOSTECKIiR Division of Proje-ct Jr Resident Programs 83/09/20 
HARRINGTON, W p Doston Edison Co- &pp 1 567> 295 24X 
Fiche 50-H93- B2/0=?/2e. B21O1 5OOO I 



5210E20015 Concurs u/LLL evaluation of util 330617 submittal re 
degraded protection for Class IE power sija Mods, procedures, 
operating restrictions i voltage schedules will ensure that 
Class IE equipment will nut be exposed to degraded voltage 
^AESflLLD. D G Operating Reactors Branch 2 82/10/08 MORIS!, A V 
3c* tori Edison Co 2pp 13786 226 24X Fiche 50-293.82/10/08, 
821O230QI5 

821O22OG17 Safety evaluation supporting licensee conclusion that aditl 

protection not required for unit aunltary trans former pouier 
source to -Class IE buses 

FfiEVATTE.R Operating Reactors Branch Z 82/iO/QB 4pp 
1S7O6 32B 24X Fiche 50-293,82/10/08.8310320015 

6209130461 "Technical Evaluation Rept (Revision I) on Proposed Design 

Mods & Tech Spec Changes on Orid voltage Degradation for 

Pilgrim Nuclear Power Stati on, Ifni t I " 

SELAH-J C Laurence Uvermore Laboratory FIN A-QS9O UCID-1B6B9 

RO-1 B2/OB/3Q WRC - No Detailed Affiliation Oiven 13pp 

1978A 332 24X Fiche 50-293, 82/10/OB, 



8aiO35QO35 Forwards filino fee for 830930 proposed Tech Spec Change 
B2-1J 

MORISr,A V Boston Ediion Co 82/10/15 VA8SALLO, D D Operating 
Re-actors Branch 2 lp 15787 07S 24X Fiche 50-293,92/10/19. 
6S1O2SOOB5 



-B21OIS0003 Notica of violation from imp on B3OB02-07O& 
* Division op Project & Resident Programs B2/Q9/33 
2B7 24X Fiche 30-E73, BZ/Qt/38. B2I01 30001 



B2 101 5001 7 IE Irtsp Rept 5Q-EV3/B3-2S on 520603-0906 Noncomp lUnco 
no'ted failure to notify NRC iwlthin 1-h nf raactor scpam 
I- to perform leak rat* test required bij liiniCing ccndltiono 
for operation fur inoperable alarm sys 

JOHNSON.J , EICHENHOLZ, H , ELSASBER, T Division of Project & 
Resident Programs 83/09/22 2Opp 13696 2B9 24 X 

Ftche 50-293, 82/09/30, B310I500O1 

B2100501i6 Forwards response to reque-st for further Info re IE Bulletin 
80-11 "Ma -sorry Ufl 1 1 Design " Issues discussed Include sliear 
itri-** far- safety-related shear wal 1 i, t) loclc pul louts, use of 
Branson f ormu 1*. masonry mall cr-ac*s d allouiable tension 
MORISI.A V Boston Edison Co 82/09/29 VASSALLO, D B Operating 
Re-actors Branch Z Bpp 1960S 114. 24X Ficha 90-293,82/09/29. 

02 10050 166 

621C06Q15Q Act receipt of 920BO& t: H7 1 trs informing NRC of steps taken 
to correct violations noted in 1C Insp Rept 5Q-2?3/B2-lS 
8TAROSTECKI,R Division of Project b Resident ^ragr^ms. 83/09/30 
HARRINOTON.H D, Boston Edison Co lp 15613 OBI 24X 
Fiche 50-293, B2/O9/3O, B2I006OI50 



102 



DOCKETED ITEMS 



~aaiQ060U4 He, ponds to NRC 0S07O7 ler re violations noted in IE Inap 
Jlept 50-393/62-12 Corrective action* draft trainina plan 
written, interim administrative controls re Tetb Specs 

l ^;S5T^?V P "S"!?-n P E2"i"" tl /w?K -m !TEC!. R 

Division of Project fc Resident Programs 2pp 15615 063 34* 
Fithie 30-293, a2/0 1 ?/30,B2100it>ISO 

6210060160 Respond* 'o WC S2O707 1U re violation* noted in IE Insp 
Rapt 50-293/92-13 Corrective action! addl operator training 
iinplerriscit-etf 6 reactor uattr level dlvaroenc* iisue 
incorporated into opSiator requal i f I cation pn 

Division of Project * Resident Programs 4pp 
Fiche 50-293.62/09/30.8210060150 

B210220521 Notification of 031005 meeting u/fti! in King of Prussia. PA 
to discus) licensee response to MftC order 

ELSASSEfi.T Division Of Project !. Resident Program* 92/09/30 
DIHCKS.W J Office of He Eiecutive Director for Operations 
DFVOijrJG.R C Director's Office. Office of Inspection and 
Enforcement MURRAV, J P Office of the Enecntive Lejal Qirector 
lp 157FJ4. 076 24* Ftthe 50-273, 82/09/30, 82*0220321 

a2081'50233 IE Info Notice SO-35, Suppl 1. "Leaking t Dislodged I-I3S 
Implant Setrti " Svt lut ntl 

CCJIIB.L 1 Divl.lon of Fuel FiclliUii. "*"; fc j"""'twt 33O 
B2/10/06 Consolidated tdi*on Co of flew Yard *>6pp 19761 -t3B 

2AX Fielie SO-000'6a/10/O6, 8209190233 

8310170731 Corapletfs respons* to IE Bulletin 30-04, "ESF fleset 
Controls " Revieu Of action,!, taken in compliance afoul Jet In. 
rovvaled daficiancies In Temporarij Procndure Bl~l,!\ re valv 
totting Ntu teit pt-ocenjurei developeil 

MOFUBI.A f Boston Ednon CD GS/IO^O? HASHES, B C Rejion I. 
Office of Director 2pp 15736 310 24X Fiche 90-293,83/10/07, 
9210190721 

8310290275 Forurd IE Irup RP* 5-?93/02-S5 on 020914-17 Mn 
nancornp 1 1 ance noted 
fttffTIH, f I" Division of Engineering ft Technical Program Qa/lO/lj 

HARRIM3TDM-W D Boston Edison Co Ppp i 5QS4 059 34X 
Fieh 30-293,93/10/13,8210290275 

0210390280 IE In*? Bepfc 50-293/B2-25 on 030914-17 No noncompl lane e 
noted Major araai inspected inaervlce inp prosrain d drauisng 
control, 1 icenie action on previous Inirj findings t Licensee 
rttpons* to IE bulletinc 

KCBRtARTV.R A DUilR. J C Division of Engineering ! Tethnlcal 
Program* B2/10/05 4pp 13BS4 Oftl B4K Fiche 50-293,62/10/13. 
931Q29&375 

BS09190238 IE Bulletin B2-03. "Stress Corrosion Crstklnj in ThicV- 
Wall.Larje-DiimBtar.StalnilBSs Stul. Rfft irculation Syt 
Pioitifi at GHR Plants " Svc lia< entl 

5EVOLJNQ.R C Director'* Office. Office of Inspection and 
enforcement 02/10-/U Contol igated Edison Co of Neu Yorlc 

llgpp ISaiO 123 S41C Ficfte 50-000,02/10/14,8309190238 

3 Reportahle o<ccur i rince, LERi * related correspondence 

0210130155 Informs of aiiaq,uncy of iraffc IE in'o notice. "Potential 
Failure of BWR B-ictup Manual 8c pan Capabi 11 ty" initlatpd 
t<l NHR, IE (< OE iubtenunt So 900939 LER BO-03B/01T-0 
CHIBAHAL.rt DlT'ctor's Office Ba/lE/18 Dlrectnr't Office lp 

1S692. 179 24X Fiche 50-an, BO/I2/IB, 8310IS0155 



B210060030 LEB 02-034 /03L-0 on 820926. both HPCI ^rea 
Biji taken out "' svc for corrective maint Majnt req 
to pai'itiirs from steam leal condensing inside tietoc 
causing false smoke indication Detectors replaced t 
UMITHEV. C C Boston Edison Co 02/O9/24 RfrOJ 

DlrectoT lp 15615 0/3 21X Fiche 50-293, 82/09/ 



6310070315 Forwards LEII B2-U36/03L-0 

MrtTKIS, C J Boston Cdison Co 83/Of/P 1 } 
Drfice of Direitor lp 15637 112 2'1X 
B3 I 007024 5 



HftVNES, R f R ( , l(m 



--B210570247 LER e2-036/03L O on 820903, dur ing 75/. pOLjer , main Un Li 
flou indicator I) merit to ', three other sluam flouj 
increased Cause suspected to be valve stem separation Finn 
poppet Valve repair plan lui 1 1 oe imp lumen toil aftpi oidaqf 
WKrrflEV.C Boston Edison Co 03/09/39 Hegiori I, l]lfut \.f 

Oii-Hctoi lp 156T/ 113 24X Fiche 50-291, Ba/O-J/Jv. U,nOOf)'.'C 

6210070340 Foruiards LER 02-Q35/O3L-0 

MA.TH1S.C J Boston Edison Co 62/0'''/29 HftYNCfS. H C Hegiun 1 

Office of Director lp 15634 Odd 24X Tithe SO-? ft l!.VO?/ t V. 
B21 007^3*0 

--9ai007034& LEB B2-035/03L-O nn 8201330, dc, ns HPC1 Obrvvif lanti tul 
jland seal condenser gasket Failed Caused by ovcrarcsluit o( 
jastet during startup Casket mat! changed to rutlitr boiideJ 
asbestos Unit tested '> returned to svc 
IjHITrJEV.O G Ooston Edison Co B2/09/2 1 ? fleoi, 

Director ]p 1 5d34 Oi7 24X Fiche 5O-293: Q2/O9, 



82(0130472 Forwards updated LER B2-003/ 1 ?7X-1 

MftTHIS.C J Boston Edison Co B3/Q9/3O HAYNES> C 
Office of Director lp 15i02 132 ?4K Fithe SO -."H. 
8210130473 



fltijli,, ], 



021013047^ Wpdateil LER B2-003/99X-1 On 830901, ut,l nroflrn ialic 
revised Tech Specs being reviewed For submilttil Lo UJii 
Updated reo rgani tat ion chart encl 

WrilTMEV.O O Ooston Edison Co 83/09/30 JtBninn I, IIMu 

Director 3pp 15682 133 24X f-lche 50-2?3. a3/QV/M HJJOl 



rtuardt updated LEft 82 -0-I4/O3X-1 
HATHISiC -J Doston Edison Co 02/10/01 HAYNtS. [1 C fltgign I 
Dff!c of Director If 15737 53f 24X Tlcfie 30 -d*/ !. JU/1W0] 
B2 10-190335 



BP10170S37 Updated LER ea-O31/03K-| or. Q308Pft. b H 111 Hl'( 1 JIM fyt 
rfetector i|s made inoperable Caused by need Fo-r torrednt 
.na-tnt due to False smoke indication resulting from 
condBnsat ion Inside detectors Detectors removed li r<rp|>iH 
qtliTHEY.S G Oostan EHison Co 82/10/01 Kc-jlon |. lltn,( * 

Oirectar lp 19/37 240 2<J* Ficho 50-213. HL 1 / IO/01 , (l.'l')l , - 



B21023012? Forwards LEIt B2-039/Q3L-0 

MATHia.C J Boston Edison Co 82/10/30 HAYNES. (I C 
Office of Director lp 15937 117 3-1X Ficho ISO -BWl 
B2102SOI27 



--&310290131 LER B3-039/03L-0 on S20920. tuning tcotn of thru TIM 
utr cleanup isolation valves 1201-2. -9 !. -GO nol 
fartftetad uithin allaued time Caused by operatlorval 
coH'straint* requiring testing at reduced potuur 

WHlTlfEy,0 Qoston Edison Co 82/10/20 Ration J llFfin t 

DiTflctor 2pp 15837 118 34X Fiche 50 -293, 0."/10/SQ, nilOiiil 1 



Foru*fda araft IE info notice, "Potential Failure of WR 
Backup Manual Scran Capabi) itij'" per 3Q120S msetinf 
agrmf rit 

LAIWA3, C Atii'tant Director for Sifttv Asaesinsnt 90/12/15 
JORDAM, L Division if Rttsldmt & Jtigional H*actor InipEttiori 
4pp l$t>12 ISO 34)! Fichu 50 -293. BO/12/18. 8240130135 

8Z10040IOO Forwardt LER 82-037/03L-0 

MATHI3, C J Bo* ton Etflvon Co 62/09/22 HAYNEB, fi C Rogien 1, 
Office o* Director lp 15530 354 2 Fiche 3O-2?3, 
8210040100 



9210280146 Forwardi LER H2-040/03L-0 

.C J Goltnn EJiaon Co 82/1O/20 HAVNE3, H C Pilltn t 
of Director lp. 15B37 225 24X Fiche 50-29,1,1)3/10'." 



--8210290180 LER B3-040/03L-0 on 6209SO, f ounil realtor pmui 
initiation function of turbine atop valva conplited 1 Jj 
[ate Cauied by dtciglon to defer test due to HSIV D lint 
liatitlon TracUng s^s implemented to prevent rscuTHni- 
UfltTNEY.O Boston Edison Co 82/10/20 Ftcglon 1, 

Oirtct-jT lp I5B37 S26 24X Fiche 30-293, 93/10/20. 



8^10040109 LER B3-Q37/03L-0 pn 8Z0623, three monlhln functinrjl 
tui-vifl lancet performed in illght ticats at allowable S3K 
tolerjrita Cauted bij piptonnil avtright Bnlr lavfl 
compllanca review implenenttd Propotel ti*t -aide Planned. 
UHITNEV.O 0, Boiton Edin r Co B2/09/82 Beaton 1. Office of 

Director Iff 15980:393 24X Ficha. 30-393, SZ/Oq/BS, 6210040100 



8210060023 Foruardt LER ea-034/031 

MATHIB.C J. Boton Ediion Co, 83/09^34 K4VNE0, fi C Kit fun I, 
Dffici of Director lp IS&iS 072 24X Plcht 30-8 
92100 t0023 



DOCKET 30-295 I ION MUCLEflfi POWER STATION- UNIT I 

F Security, medicalr emergency 6 fire protection plant 

8209290125 Rclaatet public veriion of revised generating ill 1 !)** 

entirgency plan corporate convnanrf ctr emergBnci) pljn 
Imp t minting procedure 

FELVQU.J H DiviVion at Rules *nd Rtcordi 93/09/16 tit 

Hng men.t Branch. IP 15564 122 24X FUh 50-000, 
6209290139 



DOCKETED ITEMS 



103 



B2C92901B9 Forwards public version of Revision 4 to generating station 
emergency plan corporate command ctr Emergency Plan 
Implementing Procedure EDF-3, "Environ/Emergency 
Coordinator " Receipt form encl 

PAJDHSKI.J E Commonwealth Edison Co 83/07/01 DENTON, H R NRC 
- No Detailed Affiliation Owen lp 15344 123 24X 
F(el* 50-000.82/09/16,8209390125 

B2W21Q325 Public version of Revision 4 to generating station 
esierntncy plan corporate command ctr Emergency Plan 
Imp levanting Procedure EDF-3, "Environ/Emergency 
Coordinator " 

PAJOUEKI.J E Commonwealth Edison Co 82/03/31 llpp 
15564 124 24X Fiche 50-000,02/09/16,8309390125 

&21QOB002"? Releases public version of revision to emergency plan 
imp lamen ting procedure 

FELTOfl.J M Division of Rules and Records 82/09/22 Document 

Management Branch lp 156i9 307 24X Fiche 50-295,82/09/23, 
6210000029 

&3100S003Q Forwards public version of Revision 3 to Emergency Plan 
Implementing Procedure EPIP 350-3, "Radiological Supplies 
for Medical Emergencies " Receipt form encl 

PLIHL, G Commonwealth Edison Co 02/09/O7 DENTON, H R NRC - No 
Detailed Affiliation Given lp 13669 305 24* 
FLche 50-275, 03/09/22.0310080029 

--B21QOBOQ31 Public version of Revision 3 to Emergency Plan Implementing 
Procedure EPIP 550-3, "Radio 1 og ical Supplies for Medical 
Emergencies " Procedure change request form encl 
Commonuiealth Edison CD 82/09/03 Bpf 15669 309 34X 
Fiche 50-295- 83/09/23. 8210080029 

B21O050207 Forwards revised eiomption requests from provisions of 
JQCFH50. App R, Section III 2 re post-fire shutdown 
capabil i ty, per 820917 tolcon 

LEWriNE.F Commonuoalth Edison CD 82/10/01 DENTON, H R Office 
of Huclear Reactor Regulation, Director 30pp 15&I1'086 24X 
Fiche 50-295, 82/10/01,0210050207 

B21OI3Q37& Advises that installation of offsite dose calculation sys 
program fully operational tracking model tt operational 
A- mod el uill be delayed until 021231 to complete prime 
computer installation 

SHARTZ,E D Commonwealth Edison Co 83/10/06 DENTON. K H Office 
of Nuclear Reactor Regulation. Director 2pp 15682 098, 24X 
Fie he 50-000,82/10/06,0210130376 

Q2I0290047 Releases public version of revisions to Quad CitiBs, Zion b 
Dresden emergency plan anneies tt revised oenerating 
station emergency plan telephone directory 

FEL.TON, J H Division of Rules antf Records B3/10/00 Document 

.Management Branch lp 1S077 313 24X Fiche 50-000,82/10/00, 
G21O290047 

S21O3900AO Forwards public version of Revision 3 to Quad Cities t Zlon 
emergency plan anneies, Revisi on S to Dresden emergency plan 
annex. Revis ion to Byron emergency plan annex & revised 
generating station emergency plan telephone directory 
MOORE, n D Commonwealth Edison Co 83/07/30 DENTDN, H R NRC - 
No Detailed Affiliation Given 5pp 15977 314 24X 
Fiche 50-000,82/10/08,8210290047 

B210290077 Public version of Revision 3 to Quad Cities b Zion 
emergency plan anneies. Revision Z bo Dresden emergency plan 
.annex t Revision to Byron emergency plan annoi 
* Commonwealth Edison Co 82/06/30 325pp 1S877 319. 24X 
Fiche 50-000,03/10/08,8210390047 

B210290OBa Public version of revised generating station emergency plan 

telephone directory 

OALLE.D P Commonwealth Edison Co 82/08/12 43pp 15078 218 

34X Fiche 50-000, 02/IO/OBi B210B90047 

E21O2BOH7 Releases public version of revised emergency plan 
imp I e merit ing procedure, 

FELTDN.J H Division of Rules and Record! 82/10/12 Document 

Management Branch lp 15862 241 2-tX Fiche 90-295,85/10/12, 
B2102301 17 

B3I02801EO Forwards public version of Revision 2 to Emergency Plan 

Implementing Procedure EPIP 150-1, "Stores Director " 

Receipt form tncl. 

PL I ML, O Cammoniuealth Edison Co B2/09/17, DENTON. H, NRC - No 

Detailed Affiliation Oiven lp 15842 342 24 X 

Ficbe 50-295,02/10/12,8210280117 



6210260419 Releases public version of revised emergancy plan 
implementing procedure 

FELTQN.J M Division of Rules and Record* B2/1O/12 Document 

Management Branch lp 15860 001 24X Fiche 50-295.83/10/12, 
B21020Q419 

0H10290424 Formal-tit public version of Revision 3 fco Emergency Plaiv 
Implementing Procedure 11O-1, "Station Director " Procedure 
change request & receipt forms enel 

PLIML.O Commonwealth Edison Co 83/09/17 DENTQN, H R NRC - No 
Detailed Affiliation Oivcn 2pp 1S860 002 34 X 
Fiche 30-293,83/10/12,3210280419 

8810230427 Public version of Revision 5 to Emergency Plan Implementing 
Procedure 110-lr "Station Director " Reviseii index encl 

* Commonwealth Edison Co B2/09/16 3p p 15S60 004. 24 X 
Fiche 5O-29S.82/1Q/12, 9310280419 

B21O2SQ442 Helaaies; public version of revised emergency plan 
imp lamenting procedure 

FELTON, J M Division of Rules and Record* 82/10/12 Document 

Management Bran-ch fp 15639 001 24X Fiche 90-295,92/10/12, 
0310280442 

0210200445 Forwards public version of Revision 4 bo Emergency Plan 
Implementing Procedure EPIP 350-3, "Environ emergency 
Kit & Emergency Operation* Facility Radiological Equipment " 
Receipt form enel 

PLTMI.,0 Commonuealth Edison Co 82/07/10 DENTON, H R NRC - No 
Detailed Affiliation Given lp 15859 003 24 X 
Fiche 50-293. B2/10/12, B210200442 

8210200447 Public version of Revision fl to Emergency Plan 

Implementing Procedure EPIP 550-2, "Environ Emergency Kit & 
Emergency Opera tinni Facility Radiological Equipment " 
Procedure ehanga request -farm encl 

* Commonuiealth Edison Co 83/09/03 3p p 1585? 003 24 X 
Fiche 50-275.B2/10/12, BS10300442 

B2103SO350 Pros-id*! info re organiiatlon & performance of deptv 
raiponsible for radiation protection activl ties, per 020702 
commitment Training coordinator assigned in Apr 1702 to 
improve health physics training programs 

TRAHH.T R Commonwealth Edison Co Q2/1O/14 DENTON, H R Office 
of Nuclear Rinctor Regulation, Director 9pp 15776 287. 34X 
Ft ck ' 50-000, S2/ 10/14, 021 02203S8 

S2102BO405 Notification of 821020-29 meeting s u/utll (. DNL in 8athida, 
HD to discuss ti resolve questions on proposed etemptlan to 
App R 

HI001NTON, D Operating Reactors Branch 1 82/10/22, VAROA, 8, A. 
Operating Reactori Branch 1. 2pp 15859,327 24>X 
Fich 50-S9S, BB/10/22,8ai02B0403 



H Oeneral correflpondenc* 



B2 102 10235 Comment* on facility operation NltC ihoultf deny util 
permission to USB high bifrnup nuclear fuel Evidence 
supporting continued operation of facility should be 
provided to p ub 1 ic 

QUIOO, C Pollution i. Envirnnmantal Problems. Inc 02/1O/11. 
Director's OffitB, Office of Inspection and Enforcement Spp 
1=5746 2B9, 24X Ficho 50-K9S, 0B/IO/1 1 , SSlOaiOS35 

J Iniuranc* & Indemnity information 

B21OOAO2S3 Foruardi Endorsements 60 fc 51 to NELIA Policy NF-301 !< MAELU 
Policy MF-M, reipBCtlvelij 

OSTEH.J Common uiaa 1th Edison Co BS/10/01 SALTZrWN.J, Asiistant 
Director for State b Licence* Relations. Spp 15621,073. S4X 
Fleh*' 50-295, B3S 1O/OI, 331 00402B3 

Q Advisory Committee on Reactor 0afeguard*. reports tt correspondence 

B21O27O400. Comment* on probabilistic risk assessment per B11221 
matl.Oineral met hod ti principles emplayid in analysis of 
possible rthquafce shaking t> site appear to applij modern 
stat* of *rt tschninud, 

TRIFONACiM D Southern California, Univ, of, TRIFUNAC, M. D. ACRB ~ 
Advisory Commit t* on Reactor Safeguards 82/02/23 ORIESMEVER. J M, 

ACRS - Advisory, Committee on Reactor Safeguards Spp, 15032,353, 
34X Fiche, 90-295, 82/02/23, 0210270403 



P Qper-ating license stag* documents & correspondence 



Public version of Revision 2 to Emergency Plan Implementing 
Procedure EPIP 150-1. "Stores Director." Procedure change 
request form end 

Commonwealth Edison Co 82/09/16 Spp 1986S 243 24X 
Fiche. 90-295, 02/10/12, 02102801 17 



0007150303 Notifies that revlu will be conducted of Offshore Pouier- 8ye 
short-term risk studies uiing various resources) in response 
to eOOoOS re<tuBit Evaluation mill b* submitted by B009S2 
MATTSON, R. J. Diviilon of Bafetv Technclogy BO/O7/02 
EISENHUTiD 0. Division of Licensing 2pp OS9SH'301, 24X 
FUh 30-247, 80/07/02,0007130303 



104 



DOCKETED ITEMS 



BOQ0I3OT4'' Summary of 8006" nutlng ui/util* In Bethtida, tID ri 
containmint itructural re*pcni to eon nelt accident 
tiquancit 

HEVEHi J F Pouir Bdt Branch 00/07/31 Power Bqitem* Branch 

3pp (13246 S43 Z*-* Fichi 30-247,80/07/31. BOQBI30744 



6210120105 Requeiti delay of implementation due dat*> i- NVflEO IV 
Item* IT B 2, "Plant Shielding, " II B 3, "Poit-rtct Hint 
Sairtplinj" & II F 1 1. "Noble 0*i Effluunt Monitor " 
SUARTZ.E Commonwealth Ediion Co 02/10/01 ElbENIIUTMlS 
Divinon at Ulceniino 5pp 15651 237 24X Fi<h 50-000. Slt\: 

821012010S 



6009100100 FBruardl reconuiindationi on staff tail action pln to b 
unt to licsnitii for review t rejponn, 

BARRETT, L H Opirating Ractor* Aiiennint Branth 00/OB/OB 
VARQAiS A Qp*rting Reitton Branch 1 IPre 900-428) Bff 
03516 Oio a -IX Flcha 30-247, BO/QB/OB, 6009100100 

BC09250234 Submit! deicrlptlon of uorl being don* on anal^ilt of 
reliaiet free, f ictliUei. Simple C-D nul ticompaTtment thirnal 
hydraulic cod i bring written, to analijn variety of FVCB 
de*isni Helaeid data and 

FgNSTERMACHER Reactor Sijittn. Branch BO/09/10 SPEIS, T P 
Reactor Syitimi Branch 4pp 03S09 257 24X Fich* 50-2*7,00/07/10, 
B009250334 

SOlOS2 l Oa34 Ropon,d to BOO 1 ?!? ren,uet ri control room riviiiv NRC 600507 
Itr drtail-ed five addl itini to nea-r-ti-rn OL req.uirenentt 
Item III D 3 4 requirei analy*li o-f control room 
hjibltftbilitj Mj 0L0101 

HOtJaiOMiR W AceidatH EvaluatEan Branch BO/O?/35 VARffAi B A 

Cptratino Riattor* Branth I lp 03560 001 24X 

Ficfti 30-247. BO/09 /2S. 8010220234 

S010B1003& Diicumi 5EP Branch rsvieu af J environ qualification 

o-f <if*tu-rilatH ilectrical tquipntnt far 11 SEP pla-nti 
MCKENNA.e M Svltoffla*** Evaluation Prporsm branch 60/07/30 
L(MNA3-OC DivEiion of LUiniing app 036*7 289 84 X 
F if hi, 30-003, aO/09/30.eO102t003A 

8011110034 Rsqutiti Iiistrunentaticn & Control Si/i Branch gvalution of 
util rriponmfi to qu'itianc rt inco-n Cnitrum-tntatidn tubo 
at ficilltiii rnfo will aid branch evaluation mitigation 
fditure* r back fitting of over* nittgatton Fiaturd 
SPEIS.T P Rtactor 8<jitmi Branch 00/10/09 BATTERFIELD. R 
Inttrumintatlon & Control Syttimi Branch lp 02227 001 SAX 
FJch 30-247.80/10/09,8011110004 

SQiOSSOOIB Foruardi NRC nusition* t util aniutrs re bactfltting of 
iBVira accident mitigation fiaturti Evaluation ntedrd in tuo 
nit i 

SfEIS.T P Rictor Sgittmi Branch EO/10/17 BCHAUR,F P 
Structural Enolnnrtng Branch lp 45747 104 24X 
Flchff 30-247, 90/10/17,9010200098 



8310260526 Forwarili Rviilon 3 of Chapter 9 of "Qfftjti Dott 
CalcuJ-a tlon ManuiJ " 

ODLDEt(,J C Commonwealth Edion Co B2/1O/06 CASE 1 , E 9 
Nucliar Ftvactor RtguUtion, Director 2pp 15E)05- 137 
Ficfit 30-000, Ha/10/06, B210260526 



3210260943 Revliion 3 af Chaptr 9 of "Off site Don Cllcitlatfi- 
Manual " 

Commommalth Edison Co 92/09/30 03pp 15D05 1*19 Hi 
Fieht 50-000-63/10/06,8210260326 



BSI 022039 9 Supp li B20414 raiponii to Franklin Rttvartli Ctr 6IIC.1 
t*chni<al tva luation rapt ri control af haavg lojdi 
(HUREO-OfclBf. ptr B20B24 (< 23 tilconi 

LENTIHEpFO Commonutilth Ediion Co B3/10/1S D-FNIDr; H B . 
of Nucliar Rtactor Regulation, Diroctor 3pp IS??/ 12? :IE 
Flch* 50-298, aa/IO/13. 0210220399 



B310190443 Forwarii addl info re NUREO-0737, I ttm IJ D 3, ^H- 
Accidant Sampling Sgs, " in reiponie to fJiC 020722 llr 
Util eurr*ntl(j punulng paillbilltv of developlno prcc^uTi 
to eftimate cart iJamage via Hritlnghouic ounon group 
3UARTZ.E D Commonujeal th Ed I son Co 02/10/13 FIGTKI^I C* 
Division of Llctntinu 13pp 13741 1B7 24X F-lch* 90-9^3.^ 
B2EOI90443 



8210=70344 Notification of B2I115-J6 meeting* u/utll In Olin tLI^. 
to diicuf.* baiei for current inservice tettlng propoied 
eiempt ion, inc ludlng alternative) to requirxf Inipi 
MIQOINTON, D Operating Reactori Branch 1 BS/tQ/'JJ t' AS 31, 8" 
Operatino Reactor* Branch 1 2pp 1 9S3( 354 24X 
FIche SO-295, 92/10/22,8210270344 



Inipactlon rporti, IE Bulletins k e orreip ondsntt 



E210O50105 Foruiird* IE Inup Rapt 30-295/82-09 on 
i notice af violation 
HEPPLER.J ft. 9 ion 3, Office of Director Q3/07/W 
Coimnanuialth Ediion Co 2pp 13403 022 S4X I lent 
62/07/09, 0210030105 



0210070007 flupondi to FOIA requeit for tight categoriei of ricordi re 
itiam ganrratori b ftMin turtitm App A daccments provided 
in R Udell FOIA Requitt 81-313 Faruardi document* lilted In 
App B 

FULTON. J H Divltlon of Ruin >nd Records 82/00/10 LONO, D J 
Minthrop. Stlmion, Putnam ti Rottrti 9pp 1S645-OA3 74X 
richi 50-OOO, B2/08/10,92I0070007 

B2031104Q3 Forwarifi reipon*i lo JB Dunela. chairman of Pollution Control 
Board, State of IL. qutitioni in 920127 Itr 

JOHNS TOW, M V Ai-ilitant JJlrtctor for Katirfal* & flu*l if leati on* 
Englnitring 02/03/22 LAINAS, Aniitant Director for Safttv 
Aiceitment Spp 1 SMS, ISA 24 X Fiche 50-000 , B 3/Ofl/lOi 
8210070007 

82091603113 Buppli B20B31 Itr rt B20TOB meetltig t Region 3 ore 
Recent upr*tion of Unit 2 u/tuo Inoperabli auiiliarv 
feedu-alt-r punpi Added to aginda 

REFPLE*. J O. Region 3, Off let of Director. 03/09/03 REED, C 
Common UF* 1th EdUan Co lp 14?04:OB7 S4X Flche 50 - a W, 82/09/03, 
82091 60903 

921004021 B R<iuitt reaf t iT-natl on of technical baili for oper-atloti 
at 100K poiuir Blgnlf leant financial penaltif-i Incurred due 
to ojitritlcn In ovirlij coniirvatlve Banner. 

STIEfE.H, L Comnonwealth Ediion Co, 63/09/27 DEVOUNfl, R C, 
Dirtctor'4 Dfflcei Office of Inipectian and En'orceoant 3pp 
(5S83 119. S4f Flcne SO-S95, 62/09/27,8210040310 

BS100S0270 Faruardi vinglt CIii III anend rei for prtpoiid diange to 
LUenie DPR-39 

LEKTIHE.F. O, Connionuaa Ith Ediion Co B2/09V27. DEKIOh", tf R Office 
Of Hucler fit actor Regulation. Director lp 15409-164 24 X 
Fichu 30-295,32/09/27,6210050270, 

8210080111 Forward! conpUtion ititui * revitid ichedule for 
inppoveaiinit aade to central room dltplay tine* 1900 r*pti 
ftf 80088? conflrMtoTif ordtf 

LENTIME.F. 0. Cc-BMcnua 1 1 h EdUan Co 62/10/01 DENTON, H R Office 
of Nuclear Reactor Regulation, DIrteter. 4pp 1S640 A93 SAX 
Fichu: SO-299, 63/10/04, B?l ftnoni - * 



-8310050107 Notice of violation from imp on B203HO " J JI -010? 
KEPPLER, J Region 3, Office of Director G3/Q7/Q? 3 
13603,024 24X Fiehe 50-295,82/07/09,9210090103 



-BSlOOBOlia IE Intp Rept 50-299/82-09 on 320330-314 007 00 fc !l 
Noncompllance noted individual received uhole bo-ig rllalii' 
doie In eiceff of three rm ti failure to adequately iufH| I 
evaluate radiation leveli beneath reactor velvel 
MILLER, D E , OREQER.L R DivUion of Engineering t FnK-lt*: 
Pr a or* ms, a2/0i/ll 14pp 15605 057 84 X Flehl 50- * J *H' ' 
9210090105 



0210070007 Respondi to FOIA requett for eight categorlei af rui 
iteam B*ntrton ( iteam turbinei App A document! proviJil 
in R UdlL FOIA Requeit Bl-313 Foruardf documenti 111 til 1* 
ripp B 

FELTON^J M Dlviilon of Rulei and Recordi, B3/00/10 ICfrt.' 
Minthrop, Btimion. Putnam 1< Robert* 9pp 1 36 4 9 Oi3 E4I 

Flch* 30-000, 92/08/10,0210070007. 



62100701 a? Foruardf tabulated data on (team generator Inie I w 
facd itiei. Data ihould be provided to licennei 
[PPOLITO, T. Operating Reactori Attenment Branch, BiWZ'. 
VARQAiS, Operating Reactori Branch 1 9pp. 106*9 III !' : 
F iehe. 90-00 0, 92/00/10, B210070007, 



6210070172 Feruardf info re iteam generator integrLlii i IMJi 
optratingj FMRiiper 750320 It 21 requeiti Detail* el Ln.ifi< 
including defect indicatlonu tube plugging crltri* I UU* 
plugged will not be provided except for Point Death I 
OOLLER,K R. Diviiion of Reactor Licenilng (NflR-fl enli I 
78/03/2-4 HACCARV.R R. DivUion of Technical Rviw lM**-J 
only) 9pp 15443' 196. S4X Fiche 30-000, 02/06/10- 



S2I0190SoB Foru*rdi IE Enforcenunt Conference t Imp fltpK 
& 50-304/92-17 on G2D717-090? h notice of violation 
BPESBARD^R L. Divliion of Project t< Rteldunt Proor* 
REEDiC Convn onoea 1 th EdUan Co Bpp. 15736 119 
Flch* 30-Z1S, 82/09/30, 821019034B. 



341 



R. 



9210190979 Notice af violation from in*p on 520717-0031 
* Division of Project 4 Reiident Programi. BS/0 1 J/ 
15736:113 34X Fieht: 30-295, 82/09/30,0210190948 



DOCKETED ITEMS 



105 



-B21O19059? IE Enforcement Conference t. Insp Reptj 90-295/82-19 (. 
50-304/6-3-17 on B2O717-0909 Nancomn 1 lance noted failure to 
follow 600229 conf irmatorij order requiring aipedi tlou* 
thutdQLjn whenever auiiliarg feedwater sys inoperable 
MATEitS.J R , SCHNE1DER.8 , REYES. L Region 3. Oftlft of 
Director 03/09/22 9pp 15736 111 24X Fiche- 30-295.03/09/30. 
D21019056B 

B31006O359 Ack receipt of B 20<?10 Itr informing NHC of steps taken to 
correct violation* noted in IE Insp Repts 50-337 /B l~39t 
50-249/81-32, SO-254/B1-23, 50-265/91-23, 50-395/81-31 t, 
SO-304/81-39 

SP-ESSATj, R 4. Division of Project b Resident Programs 82/10/01 
HEED.C Commonwealth Edison Co (p 15618 354 E4X 
Fiche 50-000.03/10/01,8210060359 



3 Roporteil* occurrences, LERs & related correspondence 

9,210120163 Discusses finding* re numerous -failure of containment 
isolation vilvn All failure* resulted from inoperable ASCO 
Serial 6320 solenoid va 1 vm. uoua I lq duo ta oil in air 
supply Valves undergoing qual ification 

LANNINOrH D Director's Office 80/00/23 Director's Office 

2pp I5&92 2IA 24X Fiche 50-275. EO/OB/23, 9S101201B2 

B2100 1 7O429 Dlscussei B10115 solenoid valve failure Failure of valve to 
sMft attributed to impuritie* in oil settling on valve 
surface Valve* replaced No further action recommended 
ASHE, F Director 's Off ica 01/1 1/10 MICHELSON, C Director'! 
Office 4pp 13644 317 24X Fiche 30-278, Bl/1 1/ 1O, 8210070429 



3310060367 Responds to NRC 020712 1 tr re violations noted in IE Insp 
Rept I 30-237/B1-39, 50-249/81-32,50-254/91-23, 50-26 5/0 1-23, 
50-295/01-31 6 50-J04/0 1 -S9 Corrective actions training- far 
mq t priorities re plant availability uii 1 1 be conducted 
FJEEB.C Commonwealth Edison Co BS/09/10 KEPPLER, J Region 
3. Office of Director ISpp 15618 359 34 X 
Ficne 50-000,03/10/01,8210060359 



8210070422 R-ecoromend'S IE issue info notice to inform license* of 
possible inadequate sucve il lance For proper tuning of 
output capacitance for certain inverters Recommendation 
bated on B1O30S t* 26 sola output tram-former *horts 

HELTGMEB, C Director's Office. B1/12/1O JORDAN, E L Division 
of Resident & Regional Reactor Inspection, 4pp 15644 205 24X 
Ficfie 50-295.81/12/10,0310070438 



Forwards listing of piping sya which fail to meet F8AR 
requirements, per NRC 800818 conf irmatory action Itr IE 
Bulletin 79-14 operability evaluation updates utU not be 
provided for Dreiden ! Quad Cities Final update by Pec 19B3 
RAUSCH. T J Commonwealth Edison Co 82/10/01 HEPPLER, J Region 
3, Office of Director 6pp 15640 159 24X Fiche 50-000,82/10/01, 
BE10OS017B 

21O190617 Forwards IE Insp Rept 50-295/83-21 on B2Q90S- 1 No 
nan coop I ] an CB noted 
LITTLE-M S Division of Engineering & Technical Programs 82/10/03 

REED, C Commonwealth Ediion Co 3pp 13739 094 24X 
Fiche 50-295, B2/10/05. B210I90617 



0210010003 Re spend i to FOIA req,UBtt for 19 categories of documents i-a 
nuclear raoctor events t safe*v problems Forwards document* 
llcted In Apf A 

FELTON,J M Division of Rules and ftecords. 02/06/29 UDGti..n.A 
Critical Mass Energy Project ISpp 15727 005 E4X 
Fiche 30-000, B2/O6/2S, 031 00100OB 

8111270314 Bucuties LER ai-002/O3X~l. d td Bl043-0,re inoperable solenoid 
valvas, Cause found to be Impurities in internal mechanisms 
Valves replaced ui/Kene valve* & solenoids u/higher itrengtfi 
coil Findings to be Inc orpor a ted in instrument air study 
ABHE, F Director 's Office, 01 /I I/ JO MICHELSQN, C Director 'a 
Office 3p|i 13731 109 24X Fiche 50-000.02/06/38,8310010008 



-Gai0190t26 IE Insp Rept 50-295/B2-21 on B20908-1O No noncompl ianco 
noted Major areas impacted Cijde 7 control rod drop time 
testsr control rod drive & position indication cheeks i. 
r tact or thermocouple/resistance temp device cross callbr 
ROBINSON, D L . JACK I W, I N Region 3, Office of Director 
S3/IO/01 4pp 15739 096 2flX Fiche 50-295, B2/1 O/OS, 8310 190617 



SSlOOBOOBH PHO~lll-3S-tOi> on B2O930. uh i 1 e operating at full pouerp 
one of tuio main feeduater pump* Palled Reactor control rot 
drive *v* failed to invert rods automatically Causeif by 
faultg circuit board Circuit board replaced 

REVEB, L . STnEETEfi,J , SPES3ARD. R Reolon 3. Office of Director 
B?/1O/O1 lp 15640 222 24* Fiche' 30-295. BH/10/OI, B21008008B 



IE Info Notice 80-39, Suppl 1, "Leaking & Dislodged 1-123 
Implant Seeds " Svc list encl 

CDBD.L I Division of Fuel Facilities, Materials Si Safeguards 
BB/]Q/Q> Consolidated Edison Co of New York 66pp 19761-2DO 

34X Ficrte 50-000. 83/10/06. B20BI 90233 



At* recBipt of B20910 Itr informing NRC of steps taken to 
con set violations noted in IE Insp Rents 30-279/82-14 i 
5-Q-3G4/Q3-13 Interpretation of Tech Spec 1 D unacc fff t-abl* 
SPESSrtRD, R L Division of Project 6 Resident Programs 82/10/07 
REED, G Commonwealth Edilon Co lp 19739 361 34X 
Ftche 90-395, 02/10/07,8310190613 

821OI9Q624 Repondi to NRC 620913 Itr re violations noted In IE In&p 
Repts SO-2?S/Ba-14 tt 90-304/B2-13 Disputes NHC 
classification of 020629 reactor trip Trip inadvertent 
Interpretation of Tech Spec 1 D encl 

8TIEOE, W L Commonwealth Edison Co 82/09/10 KEPPLER. J 
Rag ion 3, -Office of Director 4pp 1S740 001 24 X 
FicJi* 50-2?9, 82/10/07, 8210190613 

O819023B IE Bulletin 92-03, "Streis Corrosion Cracking in Thick- 

Wal 1. Large-Diameter, Stainless Steel, Hec Ircu laiion BIJ-B 

Piping at OUR Plants " Svc list encl 

DEYOUNO,R C Director's Office. Office of Inspection *nd 

En-f Q-pcBinent 82/10/14 Cansalldated Edison Co of Neu Vork 

113pp 15810 125 34X Fiche 30-000,83/10/14-8308190230 

IO27G34-) Motification of 8211 1S-1A meetings w/uti 1 In 01 en El Iijn, IL 

to discuss bases for current inservlce tatting propound 

exemption, Inc luding alternatives to required inipi 

JICGINrON.D Operating Reactori Branch I. 82/10/22, VAROA. B A 

3prafclnig Reactors Branch 1 2pp 13831-364 24 X 

~iche SO-293, 02/10/22, B210270344 

Periodic ope ratine reports b related correspondence 

LO19040S Forwards monthlg operating ripts for Sept 19B2 

JRAESSER.K L Commonweal th Edison Co 8S/10/06 Director's 

Jffice, Office of Inspection nd Enforcement lp 13704 003 24X 
-fen* 30-3?3 P 62/10/06,8210150405. 



121OI50411 Monthly operating repts for Sipt 1985 

AUSTIN. Commonwealth Edison Co 82/10/06 llpf>. 
24X Ficfce 50-299,83/10/06,8210190409. 



8310190699 Forwards LER B2-027/O3L-Q 

ORAESSER.H L Commonwealth Edison Co 33/10/09 KEPPLErt, J B 
Rgfon 3. OP t ice of Director lp 15738 143 24X 
Fiche 30-393, 83/IO/Q5, a2i0170c,B9 

8210190719 LER 03-027 /03L-0 on S20905, 1C containment spray rflettel 
driven pump Pounrf completely void t>P engine jacket water, 
Caused *Y leak In jacket uaber heater due ta corrosion 
Heater replaced u/ptpe plug Neu heater-e ordered 

SHIM, K CommaniiiBalth Edlton Co S3/10/O5 Region 3, Office of 

Director 1 p. 13739 144 24 X Fl c he- SO-393, 03/10/03, 



0310190493 Forward's LER B2-02e/Q3L-0 

QRAEBSEfi, K L Commonuel th Edison Co B2/10/O0 KEPPLER- J 
Region 3, Office of Director lp IS740 SAA 24X 
Ficha- 30-393. B2/lO/OB,B21OlfO403, 

821O170493 LER B2-028/03L-0- an 62O910, dur ing surveillance at 1OOX. 
ptnj*r,RHR mlniPlou control valve suitch 1F1C-4IOA failed fc 
would not close mlnlflou valve at 100O gpm as designed 
Caused by switch nut of tolerance Mod initiated 
BIMGOELI.fl L Conmonuealth Ed It on Co aS/10/08 Region 3i 

Office of Director lp 1574O 267 2-4X Fiche, SO-39S, HS/IO/OS, 
8210190103- 

821026-0399 Forwards LER 82-O30/03U-O 

ORAEBBER, K L Commonuiea 1 th EdUcn Co 0S/10/I7. KEPPLERi J 
Raglan 3, Office of Director. lp 1 9S03 327 S4X 
Fiche S0-293i 82/10/19, 



B21Q2&041f LER B2-O3D/03L-0-tin B20919, charg Irg flou found 30 gpn. la on 
than letdown flow Increased demand on eharfllng flow control 
v*lve did* -not Increase floui rate Caused by fatigue Rotating 
element replaced) Investigation ongoing 

BINOOELI. B. L. Commonwealth Edison Co 92/10/19 Region 3, 

Office at Director 3pt 19B03-33B. 24 X Ftchi 80-893. 62/10/19, 
S2IOS&0399 

821OZ60S33 Fnruard* LER 8S-O29/03L-0 

ORAESBER.K L, Commonweal th Edison Co. 83/10/30 KPPLER<J. Q 
Region 3, Office of Diractor lp. 15303:039 24X 
FUh'30~29S, 92/1O/20, 



106 



DOCKETED ITEMS 



SJ1026025* LER 82-029/03L-0 on B2Q920ilogU relay NC41M-XA atioclated 
u/pouier range XlOX reactor trip Far train A malfunctl oned 
nonconerva tively Caused bj plunger pin ihlftlng to one lide 
& binding agalntt mla<j housing 

flGHDE.J E Coflimonijealth Edlion Co BS/ 10/20 Rtglon 3; Office 

aF Director lp 19903 030 24 X Fichi 50-S95. B2/10/20, 
&21 0260*33 



B21013QJ42 Forwards description of final mods & changct to BUR icrji 
iijs & fJiort-trrm interim commitments For Unit 3 Modi will 
be implemented For Unit Z before startup from Reload -4 
outage it subuquent Uniti 1 t 3 outagci 

MILLS. L M tennenea Valleg Authority 82/10/06 HE If TOW. H R 
Office of Nucltr Reactor Regulation, Director 4pp 13673 OP4 
24X Flehe SO-259. a2/lO/06,B210130!42 



DOCKET S0-2a BROWNS FERRY NUCLEAR POWER STATION, UNIT 3 
F Security, medical, emergency & fin protection plant 



3310350096 Forward* revision to B21QQ6 implementing procedures 
HILLBrL rt Tirvnesee Valley Authority B3/10/15 DENTOW.H N 
Office of Nuclear Reactor Regulation, Director In 15793 = a 
Fiche 30-239, 63/10/15,3210250096 



B209170101 Forward i minor rBVisioni to proposed physical security plan 
Revisions withheld (rot 10CFH73 21) 

KlLi.8, L M Tennessee Valley Autnorlfcij 68/03/31 DENTON, H R 
Office af Nuclear Reactor Regulation, Director Spp 14910 091 
24X Fiche 30-299.82/08/31.9209170101 



Forward-! security plan table of contents Tb1i of conte 
ulthlield Iref IOCFR73 211 

HAMMER, D S Tenneiiaa Valley Authority 02710/19 DEN TON, H R 
Office of Nuclear Reactor Regulation. Director lp 1 S78B 3 A3 
Fich 30-259, 



9210250244 Foruards revliloni to phijfita] security plan Revitioni 
uiitnheld (raf 10CFR73 31 ) 

KAMKEft, D S Trm<m Va 11 14 Autnorft^ 82/10/19 DEN TOM. H R 
Office of Nuclear .Reactor Rtgulation, Director lp 15769 34S 
Fithe 30-250, B2/10/19. B210250244 



Adjud icatorij com spondenc* 



02 1 0350101 Ravited implementing procedures 
* Tennenee Valley Authoriti; 82/10/15 
Flche- 50-23-?, 32/1O/I5, 9310350096 



lipp 



13793 059 211 



[nipection reportii IE Bulletins It correspondence 

BB100B0015 Addl rtiaonsr to FOIA request for 19 categories of infs 
nucliar r*Jctoi- events (< iafetij problems Forwards document* 
llittif in App A Documents In App B completslij uiithheld Irif 
FOIA Eiernp 1 1 on S 1 

FECTOM, J H Division of Rules and Record! 83/07/13 UDZLi.il t 
Critical Ma Eneroy Project 9pp 15465 027 24X 
Flcli* 30-000, B3/O7/12.B2100Q0015 



bap 



Systematic asiessniant of licensee parformance notif 

evaluation for Apr 1979-Mar I9BO 

HI NRC - Ho Detailed Affiliation Given BO/03/31 
I36i7 31S 24X Fiche 30 000, 82/07/12. H21 OOHO015 



921012029L Retponae to ASLAE B2092O order to provtdi any sup 
info r nueitiont jiossi to utll Autliorl Jt(on ii for 3-ur 
itorage of loui level radud-ttii oi/o Unit on use af modules 
for interim ute on backup baiii 

RAWEOfJ, H J HoPifig Branch 4 82/10/09 Bpp 1 5652 071 
FUhe 50-259, 92/10/-09, 



S210130105 Notifin* that corrective acttoni ro IE Imp rtepts 
30-2S9/H1-13. 50-26.0/B1-13 b 30-296/81-13 dDlayod Procedure 
DPM HBOE3 re e>am of CSSO I terns to be revised by D30915 
DQMER.JA Tenneiian Va 1 leg Author i tu 92/07/1,1 
Region 2, Office of Director lp 15701 159 24X 
Fleft* SO-25?, 82/07/13, 9210150105 



Q210IS0299 Affidavit of P L.oysn re application for storage o-f Inu 
level raduaite Ha restriction requested or ton t (inflated 
Uniting us of modulai only to Inttrlm use on bjctup bails 
LQVBENiP Advanced Fuel 1 Spent Fuil Licensing Branch 62/10/OB 
H3pp 156S2 079 24X Fico* 90-239, 62/10/03,9210120291 

8210120309 Affidavit af JR taGrach Timily request ror- renawal af 
facility liceme fllld for B*atlUrNV tou level radu&fte 
dliposal fa ci Utii NV Statu Board of Hulth voted nc-t to 
reneu Facility llcante 

HCOHATHi J fi Assistant Direttor for Stjt* Agreemintt Progra-un 
B2/1O/09 ?pp 1B652 102. 3<5X Fieh* W-3S9, B2/IO'/Oa, 8210 120371 



9210230151 Pcovidei tupplemental reaponie to NHC 1 tr re vlolatiort 
noted In IE Inp P*pts SO-S39/B2-1O, 30-260/82-10 it 
30-296/02-10 Dlv of procedures Manual NB2A3 mill not be 
revHed until 82100-1 due to icope of effort Involved 
MILLBfL M TtnnessB Val ley Author i ty B2/OB/1B Q'REILLV.JP 
Rejjlon S, Q*fic of Director ip 15770 106 24X 
Ficher50-2594 B2XOS/1 B. B2I0220151 



fl3l 0010035 Cofiflrmi 62O90B iite meeting to discuss recent 
re raduMtte ihlpmnta Agenda end 

O'REILLY, J P. Region 2, Office of Director 82/09/03 
TtnnB*e Valley Authority 2pp 19965 166 24X 
Fiche 30-239. &2/09/O3, 0210010033 



--92 10 1 203 16 AffUavlt of SM Bale man Sout^ett Intertti Lou Level 
Radius its Mgt Compjct agreed to elate Barnu*! 1, EC facility 
on 921231 8. optn nw tits on 91 1231, Certi P Icatr of Bvc encl, 
8ALOJ10M,B N Anlitint Director for State Agreement! Progran* 
B2/10/09 4pa 15432 104. a Flehe. 30-239. S2/JO/03, 8210 120271 

B2102SOOi3 Telecopy n*nage of motion for rtBLAD to grant 30-Jay 
itenslon to Tiipond to ASLB B20920 order. Tlitw nictturu to 
explore lettl enenb poislbt lltln of all nttin In 
controversy 

P ?5 2, Pgl ' " fl - B *W Oocleting (, eervic. i Branch lc 

IS7B7-061 S4X Fiche 30-239, B2/ lft/20, B210SB0063, 

82:10240459 Motion For eittncton of tine until 621121 to respond to 
920930 order Time niceisary to explore pan it 11 Itiei of 
ledtlenant Certificate of Svc encl 

PVLE.R B Pg|,, R. B 02/10/20. Atonic Safety and Llcimlng 

Appeal Panel 2pp JSB06 036 S4X Flche 50-83?, B2/10/SO, 
B2102&0429 



B210010430 ForLKi-di IE Insp Repti 90-359/82-29, 90-260/62-S3 t, 
50-396/B2--BS on 820aiO~ll No noncomp 1 iance noted 
vEftflELLl.D M Dlvisian of Project t> Resident Progrsmj 
PARRI9,H TenneisBB Valley Authority 2pp 15570 211 3-** 
Flthe SO-259, 62/07/03, B210010430 

BJ10010432 IE Imp Rapts 50-297/82-25,30-260/82-23 b SO-3W&Z-1 
920310-11 No non compliance noted Major areac Impacted 
reactor leconifary containment integrity problem d M8IV 
testing 

HROOKS.e H , JAPE.F, Division of Enoineerinfl (. Technical Pro]' 
B2/OS/27 4pp 1S370 213 24X Flche 50-239, Ba/09/03,0310011 

8210150399 Foruardt IE Imp flepts 50-2S9/B2-2H, 30-240/B2-2B fc 
30-296/B2-28 on 830830-0903 No noncompl lane e noted 
VeflHELU.D M Dlvliion of Project fc Resident Prnorams B2/09/H 
PARfllS.H O Tvnnftliea Valley Authoritg 2pp 13704 029 B4 
Flchti 90-237, S2/09/20, 8210130399 



P Oparatlng llcinte itage documantt i carreinondince 



P H|l 11 '! r ?* p 5 n i' to NftC "1""* fm '"1 info on 
"Control gf Heavy Loarfi of Hurl ear Pouir 

MILLS.L,H, Ttnneneo Valley Authority- B2/09/28 VASBrtUO, D D 
Operating Reactors Branch 3 86pp. 13433 243 sat 
Flchf 50-299, B2/09/2a f e21007023S 



,, in Mlp " BM t0 ^ BBOB( > 3 "1* 

"Atqu of Space Coalliri for 

DENTON.H, R 



HPCI RCIC 

1 " 1 "" 



62 1 01 5040A IE Intp Repts 50-259/B2-2B, 5Q-36Q/fl2-2B k 30-296/03-15 
B20'830-0903 No noncompllance notad Major area* Intpacleri 
Ititervlce imp program ti Inserviet testing program review 
OIRAHDi E H , BLAKE. J Division of Engineering 1 Technical 
Proirann. S2/09/1A 4pf 13704'031 B4X Fiche 30-239,83/0^ 
&E101S0399, 

8210010097 Approve* ravlaed commitment date* for It<n 23 of App Ct 
IE Ifltp Reptt BO-239/81-19, 30-260/81-19 ti 30-296/81-191. 
Iten C.2 e-t App A to IE Insp Repts 30-239/92-la, 3Q-a6Q/B2-12 

& 30-37&/B2-12. 

LEMIB.R C. DIvilUn oC Project & Residnt Programs 38/09/23 

PARR1S,HO. Tennem. Valley Authority, lp 13345 001 S4K 

Flehe' &0-2S-?, fl2/09/aS, 8210010097 



CU I I tfVBt) 



107 



--83 IOOIOIQ4 Requests ei ten si on to respond to App Ci I tern 25 in IE Insp 
R*pts 50-259/at-l 1 ?. 50-26O/B1-19 *> 5O-S96/91-19 fc Item C 2 Jn 
IE Imp Rents 50-S59/B2-12, 50-260/82-12 (, 50-S96/82-12 
Hipor>5{>i uil] be submitted by 0301 Ol 4 021 101 , respect! vly 
HILLS, L M Tennessee Valley Authority 82/09/01 O'REILLY, J P 
Region 2. Office of Director Ip 15565 002 24X 
Fichi 50-359,32/09/22.0210010097 



81 12210339 Faru/ards description of events b resulting action rfl high 
circulating current asjociated u/Inverter output due to 
lack of circuit tuning IE circular or info notice ihoulrf be 
issued to addres-s Issue 

HLTEI1ES.C J Director's Office Gl/lS/lO JORDAN, E L 
Director's Office 4pp 15731 36], SAX Fiche 50-000,02/06/28. 

021O01O008 



= 210010326 Fnrcjards imnmary of 020908 enforcement meeting u/uti 1 to 
dicun corrective actions re leakage during shipment of lou 
level uastt tt util plans for improving employee training 
O'fieiLLV, J P Region 2, Office of Director 02/09/22 PARRIS, H 
Tennessee Valley Authority 4pp 15569 IBS 24 X 
ffche 50-359.62/09/33,0210010326 

2IQOIO290 Act receipt at supplemental 920901 I tr informing NRC of 
tep* taken to correct Violation B noted in IE Imp Repts 
50-359/81-36, 5Q~aAO/B2-26 i- 5O-296/01-26 

LEWIS, fl C Dwliion of Project & Resident Programs 32/09/34 
F ARRIS, HG Tennessee Valley Authority Ip 15573 183 24X 
Fuhe SO-2S?, 82/09/24.0310010290 



B21&0600B2 "Summary of Ofc of Analy*lt & Evaluation of Operational Data 
Analysts ti Evaluation of Broims Ferrv Unit 3 Partial Failure 
to Scram Event of a 00 62 a " 

LANIK.O Director's Office SI/1I/30 H2pp 19731 263 24X 
Fiche 50-OOO, 62/06/23, B21O010OOB 

B210080015 Addl response to FOIA request for 19 categories of info re 
nuclear reactor events & -safety problem* Forwards documents 
listed in App A Document! In App B comple>belg withheld (i-ef 
FOIA Eemptiort S) 

FELTON,J rl Division of Rules and Records 02/O7/12 UDELL, R A 
Critical Hist Energy Project 9pp 13ti3 O27 2<tX 
Fiche 50-000,82/07/13,6210000015 



-631OOJO30* ForiLrards revised response to NRC 811028 1 tr re Violation D 
noted in IE Imp Repts 30-359/62-26,50-260/82-26 & 
EO-29&/8S-26 Corrective actions R factor returned to within 
linili t revision to Tech Spec approved 

t11LL.S f L ft Tennessee Valley Authority 02/09/01 O'REILLY.J P 
Region 2, Office of Director 3pfi 18573 101 24X 



:iO22O390 Foriiiartf* IE Insp fiepts 50-239/02-29,50-260/02-29 t, 
5O-a76/e5~S9 on 02O90A-10 No noncomp 1 iance notod 

UERHELLI.D M Division of Project fc Resident Programs B2/09/3O 
PARfltS.K G Tennessee Valley Authority Kpp 1 5779 230 24X 
Fiefte 50-259. B2/09/30. 0210220390 

B310230-SO! IE Insp Repts 5O-259/82-29, 50-S60/B2-29 t< 50-396/02-29 on 
6207D&-IO No noncomp 1 lane E noted Major areas Inspected Unit 
2 refueling fr naint outage ti procedural compliance of 
^l^alt^ pfiys ics- re lated practices by workers 

COi-LINrg,r R , BARR.K P Division of Enoineering & Technical 
Pros-rami 62/09/27 Spp 13779 222 24X Ficne 30-239,02/09/30, 
eaiO22t>390 



B2100fl0197 NRC operation* etr uiage chart r events at facilities 

* NRC - No detailed Affiliation Given 82/07/10 Ip IS its 2S1 
24X Fiche SO-000, B2/07/12, 021 OOSOO I 3 

8210060265 Foriuardi LER ea-O42/OaL-0 

OREENrH J Tannesiea Valleg Authority es-/C9/3B O'REILLY, J P 
Region S, Office of Director. Ip 19621 0,A SAX 
Fiche 30-296, 02/09/23, 621 006O265 

~a2IOOiOH7O LGR B2-043/03C-0 on 020831 , d iese 1 generator 3C right bank 
*lr starteri failed to develop mln rpm Caused by looie bolt* 
on right lank air start valve 833-3 Units tightened 
PORTER, MR Tenn5iB3 Valley Authoritg, 0S/09/20 Region 3, 

Office of Director Sp p 154H1 077 24 X Fiehe 50-396, 92/09/20, 
821OO60265 

S210130157 Forwards LEU Ba-O43/03L-O 

OREEH,H d Tenneasea Vallny Authority 82/IO/07 O'HEILLV, J P 
fi B lon 2, Office of Oirector Ip. 15673 O77. 34X 
Flche 30-296, 82/10/07,6310130157 



IQO3Q2I9 Foriuard-s revised request for relief from Insdrvice Insp 7 re 

I nj cc t s s i, h le uelds In piping penetration! tt under rigid pipe 

rtTainti Best effort visual el am will be performed during 

ivi hydrostatic pressure test 

1ILLS, L M Tennessee Valley Authority 82/10/04 DENTON, H, R 

3*fice of Nuclear Reactor Regulation, Director 3pp 1S63B 083 

?4X Fiche 50-259.82/10/04,8210080219 



--0210130162 LEfl 82-043/03L-O on 020909 r 460-vo It reactor motor operated 
valve board 3DN motor-generator set rsmnved from svc whan 
g*n*rator/f lywheel bill aaaring bee am* naliy Cau*d by lack 
of Adequate lubricant film on bearing Bearing replaced 
AARON, J, A nnneisee Vail eg Authority 82/10/07 Region S, 

Office of Director Spp 13673 070 24* Fiche 50-296,82/10/07, 
B21OI30157 



! 3110533 IE Info Notice 80-35, Suppl 1, "Ueakind (. Dlllodged I-1SS 

.Tf lant Sefds " Svc list encl 

QBB.L. I Division of Fuel Facilities, Materials 
S-'IO/Ofi Consolidated Edison Co of Neui Vart 

'4X Ftche SO-OOO, B3/IO/Oi, 8208190233 



Safeguards 
66pp 19761 2&0 



d 1502 IS F<jruai-d update of present work b schedule for 

tap 1 vflKntaHon c-f insps required under IE Bulletins 79-03 & 

9-14 Friai* II evaluation will not be completed until 

3OBOI 

ILLS. L H Tennessee Valley Authority 03/10/07 O'REILLY, J P 

gicm 2. Oftici at Diractor 2pp 13705 276 34X 

IChp 5O-259. B2/1CV07, 8210150318 



]E BulUtin 02-03, "Stress Corrosion Cracklna in Thick- 
ill. Lir5pe-Dijimter, Stainless 0teel,Recirculatlon Sij 
ip Ing at DWH Plants " Svc Hit encl 

tYOUHO.ft C Director's Office, Office of Inspection and 
-.forcemvnt SZ/IO/14 Consolidated Edison Co of Neu York 

ISpp I5B10 125 24X Fiche 50-000,82/10/14,0200190238 



occurre<ncesi LCRs Ii related cor reipondence 



8210290231 Foruard* updated LER 02-O37/01X-1 

GflEEIJ'H J Tennessee Valley Authority 92/10/14 O'REILLY, J, P, 
Region 2, Office of Director Ip 15QS3 231 24X 

Fich*- so-296, ea/io/i 4, 



--0ai02 < ?0232 Updated LER Ba-037/OlX-l on B20H24, flur ing Instrumentation 
callbr for corB standby coaling *yi Euppresvion chamber, 
cillbr v*lve on level tuiitth US -73- 57 A found open rendering 
tuiltchei inoperable Cauied by open valve Valve closed 
IRBV-B J Tennessee ValUy Author! tij B2/10/13 Region 2, 

Office of Director 2pp 15053,232 S4X Fiche 50-296,82/10/14, 
8310270231 



T Hearing tranicr Ipts an nc-n-antltruit mabtri 



3210070133 Testimony of M Hutton answering ASLAU questloni on lou 
level raduast* mgt optloni Availability of <idei|uate *pace 
to dispose of lou levvl waitea in n*t 3 yri orctrtain 
Ctrtif 1 cat* of Svc ncl 

HUTTOM, JW TennesseB V.lleu Authority B2/HVOI, 12pp 
15637 031 24X Fiche 50-2IS9, B2/IO/OI , 82J007O133 



K12O129 AJvi*ei of need for in~dpth evaluation of potential for 
,accptab] e interaction betueen control rod drive lye b 

ni*ntiat control air sys Margin of safety Inherent in 

cvnsed tf*ilgn basis should he promptly restored 

CHELSOM.C Director's Offic* 80/08/10 DENTON, H, R Office of 

clear flnJctor Regulation, Director 3pp 15692,130 24X 

ch*. 3Q-296, eo/OBJ'ie,a2101201S9 



Retponrfi to FOIA request for 19 categories of documinti r 
rl*ar reactor event* d safty problems. Forward* documents 
t<f In App A 

LTON.J M flivliion. of Rules and Records. 02/06/B8 UDELL, tt. ft 
lttc*t Hait Energy Project ISpp 19727 009 24X 
cha 5O-OOO> BS/Ot/SB.SSlOOtOOOB. 



DOCKET 60-298 CQOPEfi NUCUEAR STATION 

F Se-curifcyr medfcali emergency & fir protsction plans 

SS 100 10038 Foruardi rept of change to af*juT<f* plan, Rvltion 0, 
Rept Withheld (rejf 10CFR2. 79O ti 10CFR73.21). 
PILANT'J.H Ntbraska Public Pouer Diitrict. 82/O9/13, 
VASSALLO, D B Dperatint Rtactors Branch 2 tp 19967' 153 34 X 
Fiche 3O-39S, B2/09/13, 8210010O98 

8210130318 Forward! change! to Revielon 1 tfi laffguardi plan, Changes 
uitJiheld (raf iOCFRZ 790 & 10CFR73 21) 

PILANT. J,M, NeJ>rska Public Pouer Dlttrict BS/10/04, VftSflALD, D. B. 
Opirating Reactori Branch Z Spp 13473 l&O 24X 
Fiche- SO-29B, B2/ 10/04, 82I013031B 



108 



DOCKETED ITEMS 



B2101B0320 Forwariil QE proprietary uniqiri analvilt Mpti for facility 
Riptt withheld (nr loCFfla 7*501 

&1ESEL.B. Operating R*4ttor Branch 2 B2/IO/0* BUBRAMONI AN. N 
Franklin Inttltutr/Franll In Research Gentir Ip 11746, CIS 24 X 
Flchi SO-29B, 62/10/04,8210130320 

B 8102402 17 Forward! raiponie to NRC B2QB09 Itr forwarding notlct o* 
violation fc propoiid imposition of civil penalty t< order 
modifying llcinse Magnitude of infurctmtnt action not 
warrant id 

JONES, <! H Nebraska Public Poutr OlttrUt 82/10/07 DCVDUNOufl C 
Director's Offlcin Office of tnipectton and EnfcTcimtnt. S4pp 
13B04 OBI, B4X Fiefie 50-E9B, B2/10/OJ, B210240217, 

BS10220254 Submit! update to B20416 reiponte to 0-tnerle Ltr SB-OS. 
confirming optrabllltii t< ln*tlltion ol poit-Trll 
requirement p ir NUiREQ-0737, Itim II F 1 n acci-dtnt 
Monitor tnj Irntrujnmtfttion, noble gat b lodint pertlculate 
PILANT.J H Nebrecka Public Paiuer Dittriet B2/10/1-B 
E(EENHUT,D 9 Civilian of Uetntlnj Ip 1S774 226 24 X 

Ficht SQ-29B, 82/io/iB. 



8JI0260298 For-uardi IE Safeguard* Imp Hept 5Q-299/B2-2B on 
aaOBaO-om-Notlte of violation withheld (r*f IOCFR73 31). 
MADSEfliO 1 L DIvltLnn o-f Htiidinti Rttctor Project t> Enginitring 
Pregnni, S3 /1 0/22 PILANT.J h Mtbrijln Public Poiuir Dlitrict. 
2(>p la01'3B9 S4X Flch,aO-3 



B2I02i030t IE 9*#igurdt R.pt 80-298/92-13 an 020330-0901 Mnncaffp lU 
not>d,ditil* ulthhfld <rtf 10CFH73 91) 

CALEWELLffi A , HEU.Y. J A F. R)ion 4> Of lie* of Dlrtcti>r 
33/10/14 Ip, 19301,360 S4K Flch*' 30-29B, 62/10/22, S21GSAOE9B 



P OptrHnfl llcinti *tg documtnti ! 



0210120801 Fflrwjirdf ordir fflftJItglng 910113 ordiT' n tindlng eanpltlon 
rfftti for Ini t]l4tlan of plant fflodt ntidiil to <0inplu u/ 
NUSEO-0641. App A to ttdrt of Full Cyll 9, 

'D,&, Operating Ructoet Bl-ineh a e?/0?/19, PILANT.JM, 
Pifbllc Poutr DUtrict, 2pp, 134B^;BO<? 24 X 



-sa[01SOS70 QrAtt madl^ijlng BlOJia Qrdir.tittndlng conplitlon dit far 
intt*Utlon of pUnt modi n4id to comply u/NURE&-06ilr 
App A t itifb of Full Cijclt "?, 

EI0EWHJT,D. *. DtvHUn of Hctn*ing, 02/09/1B. hlibrifk* Public 
Pouir Dmrlet, 6pf, 18684:211, 84X Fichu 3Q-29B, fla/09/1 B; 

aaioiaoBS4. 



ej!02fiOE17 Forward! raipon** to NRC 8BOS09 Itr foruapd juj notiti oi 
violation t, propond impontion of civil pvnaltij t ordtr- 
nadlfqing He enit Magnitude of n forte men t action not 
warranted 

JGWeB.C R Ntbraika Public Pour Dutriet flS/10/07 OEVDIJHJ H 
Dirtctor'* Offitt, Offlei of Inlpoetion and En fore am tut Bin, 
15804 OSI Z4K Fieha 50-290.02/10/07,0310240217 

8209190239 IE Dull. tin 02-03, "Strut Corrosion Clicking in Ihm- 
Wall,Lrg-Di jmi t>r> Stainlt ti Btial, Rc Ircu lat i an Bn, 
Pipinj at BWR Plant* " Bvc Hit tncl 

DEVOl/NO-R C Birestor'i Offic*, Office of lnp act ifln *i,j 
Enforcimnt 62/10/14 Coniolidated Ediion Co of Hiu Van 

lISpp 15S10 1HS 24)i Fiche 50-000, 92/10/ 14. 33001^0230 

9210220130 Acfc ricaipt of 820910 Itr informing NHC of ttept \,im t, 
corrrct violattorn not*d In IE Imp Rpt 50-2?a/ga-|i 
MADBEH.O L EMvlilon of Rftidnt, Rtactor Projett t. Enoiiurlri 
Projpami B2/10/14 PILWJT.J M Nebraska Public Powtr DlilrlM 
Ip 19779 US 24X Flch* 50-B9B. 92/ 10/14, B2103B0130 

-8210220134 Rfipandt to NRC B20913 Itr r wiolationi notrt m IE j 
ftept 50-298/02-16 Cocrtctive aetioni tntrg uiayi into * 

*fPectid *ri paitiil, locked or obnrviblt to radiographii 
Ddc 1 p 1 inir ij action taltin re Procedure 7 4 4,Rvifjon 1? 
PILAMT,J M Ntbraika Public Power Diitrict &2/O9/10 
MADBEH.O L Division of R.tidont, Reactor Project fc Enjirinr, 
Prosi-ami 3pp 13778 117 B4K Fieh. 30-29H, B2/10/ H, 



S21026032S Foruard* rivitioni to S20329 Relief Requatt RP-0! i f- 
re lnsrvic Insp/teitlnj requirements for pumps fc vdlvti 
PCLANf, J M Nebraska Public Poioer District 62/10/19 
VABS^LLOrD B Operating Riactnrs Branch 2 4tp 13795 31* :,. 
Flehu- SO-29S, 92/10/19,8B10B603SB 

92102AO299 Forward* IE Safeauardt Inp Rapt 30-K7a/fl2-2B on 
620830-0901 Notice of violation withheld (rf 10CFf?73 ai; 
MADSENiO L Division of Ruident, Reactor Project i Enolnrtmi 
Programs B2/1O/S2 PILANT.J.M Nibrask* Public POLI*T District 
2pp 1BB01 389 2flX Fiche 50-299, 82/10/28,8210360298 



Hanivn 



--821-0260301 IE gafguardl fltpt BO-2?B/flia-2S on 

notad- dtl U uithheld (ref 10CFR73 SI) 
CALDUEUU, R A., KELLV, J A F Region 4, Office of Director 

B2/10/14 Ip, 1SB01 360 24X Flche SO-H^a, B2/10/2B, BBIOJt- 

fl. Riportabli oecurrncs, UERs t rilated corrnpondenee 



9210270300 Informt thit tntigrjtlon of- NUflBO-0737, Itun II.K.3, 27 
"CetMiitn flif t-tvil" i It I.D.I, "Control Room Dtiljn 

PIT ull eaOfSO eamnltinenti uJll tllminati opirator 

ult(ti( from ei*nglng uittr livel, 

. D, B, Op*ntlng Reton Branch 9, 52/IO/ia, P1LAFJT.J.H, 
Pot He Peutr Olitrltt, 2pp, lBS3ii33?, S4X 
Fi chi! SO-S^a, 93/10/12! S310a7030S, 



921001000B Rstpondi to FOIA riquest for 19 cabeflorlei of 
nucltar flactor tventi ti lafetu problem) Forwarifi dotu 
Utfi> in App ft 

FELTONiJ M Divlelon of Rules and Records BZJObfZB 
CPlticil Ha*i En*rgu Project. ISpp 15727,009 24)! 
Flcht; 90-000, 02/06/20,6210010008, 



6210230384 flubmits upditi t<i 8204 li rtlpfrnii to 0narle Ltr 93-08. 
confirming apiribllltu * InitiLlatlcn of pait-THI 
fMulrininti pr HUflEO-0737, I6t n II, P. 1 rt tec^int 
fflnltorlng Initrunintatianinabli gt fc lodlm j*rtteulti, 
PltANTrJ.M, N*bra.ik* Public Power Dlitrlct. S2/10/1B. 

fl, 0. DWlden o# Lletnilr;, If, i?74nBSB. MX 

WB. 6a/io/ie,aaioaaoaB4. 



Forutfrdi ravliloni tb BaMa? Rillif Riquift* RP-03 It HP-04 
PI InifFvlc* inip/*tH(flj riquirtnint* far punpi t vjlvn, 
PILANr. J.H. Mfbriti Public Pguir DUtrlet, 82/10/H, 
VAIflALLOiD.B, 0?ir**lng RucUn Jtinch 0. +)), lB799j344, B4V 
r*UkiiM-8fliU/lQ/lf,H10MOaRI. 



Bubniti juitmeitlnn far (entinu.J flint opiratlon n OE de 
ntrllct. r*Uwr* e/ M fflntro]Jr< dui to fitrifi 
itivlren uiil net ^ict nfi ihutdoyn, Cntr(-llri uill 



Nibriika Public "ouir Dliirfct. 
D, B. Oj>ri<ilnfl RactM Branch S. Ip, 

P 



Bullltlni h "Ttiipondiiiti 



IB in* NO*UI io-as, suppi i, "(.lining 
ftitat," flvc Hit mcl, 

X 1 ' 10 ?^*/!!'!,?" 11 !"* 1 ' "''UU I- Bifi 
Oanialidititl Edlien CD. of Ntu Vark. ftiiip, 

" 



DOCKET W-301 POINT BEACH NUCLEAR PUNT, UNIT S 

F. SuHtg. medical, emergency b fire protection plant 

flit 0040 119 DlieuiiBi rtviiion of pUnt emergency reipons* ureiH 
i(ieiCij(nj ntceiiari; precaution* requlrad before poit- 
aesldent rt-entry into *u>fllrij bldg or facade, In ropeni* 
to B20914 raqueit for Info re NUREO-0737, ItM II D,2 
FAY*C,H. Ultconlin Electric Pouttr Co. 88/O9/24 DENT OH. H * 
Office of NoeJ*p fl*tor ffejulatjan, Director, CtrtftK.fl A 
Opfratlr-g fleactoM Branch 3, 2pp IS9B1.201. 24K 
Flch*: 30-266. gz/Of/24, 8210040H9 



9210090373 Furui-<ft aildl Info refl.uilted In NRC B209li til<n It 
lupport utll 920630 App R entmptlon requett, Eight ovirtlti 
driwinei ene 1 , Apirtun cardi an availabli in PDR, 
FAYrC.H. Wliconlin Elietrlc Power Co. 82/09/29, DEHTWH* 
Drf let of Nuc teat- Ructor Rijulition, Dlrvctar CLARK, (1 A 
Djrtln Rc*cn Branch 3 13pp. 18A06- 047. 24X 



for n*rginii| it<fl 



B3100BQ054 Forward! addl info n propond ma 
ctr. 

FAViC U, UUeemln Electric Pouir Co 82/09/30. DENIOM.m 
Qttitt of NIK 1 ear fine tor Regulation, Director. Ifcsp IJM3 3 
S4X Flehi: SO-aii, BS/09/30, B2100SOOD4. 

B210S70396 Riltat** public version of rivlteit mirgnc v tint 
Impltmintina pracedurii. 

PELTOHrJ. H. Dlvlilon of Rulit and Racords. 93/10/DQ. tn**^ 

Branch, Ip. 19834.001. 24X Rent" BO-Wi.eS'H^l 



DOCKETED ITEMS 



109 



6210270259 Forwards public version of revised emergency plan 

implementing procedures. inc luding Procedures EPIP 1 1 re 

initial classification, EPIP 1 3 re estimation of source 

term t EPIP l 4 re radiological dose evaluation 

FA/, C W Wisconsin Etuctric Power Co B2/09/10 DENTON, H R 

Office of Nuclear Reactor Regulation, Director CLARK, R A 

Operating Reactors Branch 3 4pp 15334 002 34* 

FicUB 5O-266, 82/1O/OB, B210270236 

SS1O27-0241 Public version of revised emergency plan implementing 

procedures, inc luding Procedures EPIP 1 1 re Initial 

c lass l f l c at ion. EPIP 1 3 re estimation of source term fc 

EPIP 1 4 re radiological dose evaluation 

* Wisconsin Electric Poiuer Co 82/09/10 244pp 1 5834 006 24X 

Fjche 50-266,82/10/09.8310270256 

BS1Q150471 Foruards addl info re S2O630 requests for exemption from 
1 CCFR5O App f? concerning Fire Area 9, control room t. 
vertical cable trays, in response to B2I001 t. 06 t e Icons 
in, / SvjlC H/16 oversne drawings Aperture cards in PDR 
FAY.C H Wisconsin Electric Power Co B2/10/11 DENTON, H R 
Office of Muclear Reactor Regulation, Director CLARK, R A 
Ope-ra'.ing Reactors Branch 3 12pp 15734 350 24X 
Fiche 50-266,82/10/11.0210150471 



8310040414 Forward* Amands A3 (t 6S to Licenses DPR-24 i DPR-37, 
respectively, safety evaluation * notice of iisuance b 
availability Amend* revise insorvice inp Tech Specs 
CLARK. R A Operating Reactors Branch 3 62/08/31 FAY, C W 
Wisconsin Electric Pauer Co 5pp 13397 134 24X 

Fiche 50-266, B2/OB/31.B2100'1Q414 

B21004042Q Amonds 63 & 6B to Licenses DPR-24 b DPR-27. respec t Ive lyi 
revising language of Tech Spec* re Inservice imp 
requirements of safety class component! to conform 
'J/1OCFRSO 33 

CLARK, R A Operating Reactors Branch 3 B2/OB/31 16pp 
15597 37 24X Fiche SO-266, B2/QO/31 . B21 0040414 

8210040429 Safety evaluation supporting Amends 63 & 68 to Licenses 
DPR-24 t/ DPR-27, respectively 

* Office at Nuclear Reactor Regulation, Director 82/08/31 4pp 
1S597 135 24X Fiche 30~2ifi, 32/03/31, BS 10040414 

B21004O4S7 Notice of issuance & availability op Amend* 63 & -60 *o 
License* DPR-24 & DPR-27, respec tively 

CLARK, R A Operating Reactor* Branch 3 B3/09/3I 3pp 
15997 179 24X Fiche 50-366. 82/00/31, B210040414 



Ad juif natory 



apondence 



3310050251 ttsmorandum >< order granting summary disposition of all WI 
Environ Decade issues except issue of demon strati on of 
a d e qi/aEy of eddy current testing tp detect cracking 
BL.OCH, P C , KLINE, J R < PAXTON. H C Atomic Safety and Licens ii>g 
Board Panel 82/1O/QI Wisconsin's Environmental Decade 19pp 

306 24X Ficho 50-266, S2/ 10/01 , B21O050251 



otice of 6^1117-20 evidentiary hearing in Two Rivers. HI rt 
a tfe nuactj of inservice nondestructive testing of sleeves 

tubes Prehearin; conference to be held after hearing 

BLOCK. P D Atomic Safety and Licensing Board Panel 82/10/15 lp 
325 24X Fictie 50-266. 83/ IO/ 15. B310200027 



B310050005 Adviies that error analysis of reactor vesiel water leve-1 
Intruni*ntaticin ay requested In NRC BSO61? 1 tr uill a* 
available by 330115 

FAV.C W Wisconsin Electric Poiur Co aa/O9/H9 DEMrON, H R 
Office of Nuclear Reactor Regtila tion. Director CLARK' R A 
Operatino Heactoi-a Branch 3 lp ]S605aOS 24X 
Fiche 50-266, B2/09/29. S21OOMOO5 

82100SOOS5 Foruiarils infa rea,uiteiJ in NRC B2Oi30 Itr r Implementation 
of TMI Item II D 3. "Post-rteciBent Sampling 8ys " Addl 
requirements re backup pouier lource* for lab are beyond 
scop* of original NUREO-0737 implementation schedule 
BURSTEIN, S Wiicansin Electric Pomer Co 82/09/30 DENTON, H R 
Officn of Nuclear Reactor Regulation- Director CLARK, P A 
Oporating Reactors Branch 3 SIpp 15603 307 S4X 
Fiche 50-2ii, B3/09/30. B21O050055 



Notice of relocation of B21H7-20 hearing From Tuo RiVerB.MI 
ta Mi luaut ee, UI Limited appearance statements uill be taken 
at original location on 921117 

BLOCK. P H Atomic Safety and Licensing Hoard Panel 32/10/21 lp 
35] 24* Fiche 50-266, B2/10/21 . B310220H42 



license stage documents J- correspondence 



Recommends review of design of int erconection between 
r-edundant safety-related electrical load groups Design 
should be modified to assure full compliance in/Hog Guide 
1 A 

Director's Office 00/OB/27 DENTON. H R Director's 

2pp 157B2 208 24X Fiche 50-266,80/09/27,8310210009 



Office 



Responds to FDIA request for If categories of documents re 
nuclear t-eactror events & safety problems Forwards documents 
li-sted in App A 

FELTDfJ. M Division of Rules and Recorda S2/06/2B UDELL , R A 
Critical Mass Energy Project ISpp 15727 005 34X 
Fiche 50-000. B2/O6/2B. B21OOI0008 

-- eOO314O204 Faruarils evaluation of proposed Tech Specs change to operate 
facility at 3350 or 2000 psia Proposed changes are 
acceptable W/o end 

CHECK, P S Reactor Safety Branch 77/12/26 9CHWENCER. A 
Operating Reactors Branch 1 (Pre 300428) 6pp 15727 030 24X 
Fiche 5O-OOO. B2/06/38, 921OOiOOO8 

QS1OO70OO7 Responds to F01A request for eight categories of records re 
s team generators t steam turbines App A documents provided 
in R Udell FtllA Request 81-313 Forwards documents listed in 
It 

, J M Division of Rules and Records 82/08/10 LONG, D J 
Wintfir-op. Btimson, Putnam & Roberts 9pp 1 SMS 063 B4X 
F*iehe 50-000, B2/OB/10. B210070007 

Bl IO290030 Advises that technical reviewers providing input for SER 
must be available to testify at 01IO39-31 hearings Schedule 
tt agenda info encl 

CL.ARK,R A Operating Reactors Branch 3 81/10/20 MURPHY ,E . 
^EHEKIAS, J . HO, T NRC - No Detailed Affiliation Given 3pP 
15643 271 24X Fiche 50-000,82/08/10,9210070007, 

S11O30O460 Requists evaluation by 811023 of util S10708 application for 
license anend to permit steam generator tuba sleeving Info 
to bfl presented at ASLB 811039-30 hearing 
COLBURH. T Operating Reactors Branch 3 Bl/10/19 BALLARD, R. L 

Environmental Engineering Branch lp 15643 270 24X 
f="*chfl 30-000,83/08/10,8810070007 



8210050222 Application to amend Licenses DPR-24 << DPR-27. revis i up spent 
fuel pool poiioh surveillance specimen location & clarifying 
condition! for operating poiuer-operat ed relief valves 
FAY,C W Wisconsin Electric Power Co 03/09/30 DEN TON, H R 
QffiCB of Muclear Reactor Regulation, Director, 3pp 15609 054 
24X Fiche 50-266, B2/07/30, BB1005O232 

6210030231 Propotad Tech Spec* revising spent fuel pool poison 
surveillance specimen location b clarifying condition for 
operating p our-aperated relief valve* 

Miitonsin Electric Power Co S2/O9/30 3pp 13609 OS9 2-VX 
Fiche 90-866.82^09/30,3210030233 

8210290426 ForuardB Amends 64 4 69 to Licenses DPR-24 i DPR-27, 
reipectivelij' safety evaluation & notice at issuance t. 
availability Aminds modify operation i surveillance testing 
requirements of containment purge supply & eihaust valves 
COLBURN.T Operating Reactors Branch 3 B2/10/04 FAV.C W 
Wiiconiiti Electric Puuer Co 4pp 1 SB63 143 24X 
Fiche 30-866.82/10/04,0210290426 

8310890431 Amend* t4 fc 69 to Licenses DPR-24 & DPR-27. reifiec t ive ly. 
modifying operation t> curve! 1 1-ance testing requirements of 
containment purge supply & aiheust Isolation valvei t 
terminology of Tech Spec 15 4.4 an testing, 
CLARK, R A Operating Reactor* Branch 3 83/10/04 12pp 
13963. 184 84X Fiche 5O-Sfii, H3V10/O4J B210290426 

B2i02904Q6 Safety evaluation supporting Amends 64 b 69 to Licenses 
DPR-24 It DPR-27, respectively 

^ Office of Nuclaar Reactor Regulation. Director 82/10/04 5pp 
15BS3 146 24X Fiche 50-266- B2/10/04, 8210390426 

S21029O441 Notice o-f Issuance Si availabllitv of Amends 64 h &9 to 
License* DPR-24 & DPR-27, respective ly 

CLARK.R A Operating Reactors Branch 3 B2/10/04 2pp, 
1SB63 151 24X Fiche 5Q-St,ti, BH/10/04, B2I03904S6 

92101902B4 Advises of mod to RGB 441 vent sys to prevent operation of 
power operated valves during normal plant operation, per 
821012 telcon Physical restraining device fitted an or aver 
valve operator switch 

FAY,C W Wisconsin Electric Power Co- 82/10/19 DEMTON.H, R 
Office of Nuclear Reactor Rigulatlani Director sCLARKi R. A 
Operating Reactore Branch 3 lp J5743'177 24X 
Fiche SO-266i B2/1O/13, 83IOJ90HB4 



110 



DOCKETED ITEMb 



6310270594 Forwards Amends 65 & 7O to (.Icense-i DPH-24 t. DPft-27, 
respec 1 1 vely. aft"j evaluation if notice of issuance & 
availab 1 litg Amend allots relaxation of monthly turbine it op 
t. governor valwe tetts during end of cycle operation 
COLBURN, T Operating Reactors Branch 3 82/10/15 FAY. C H 
Wisconsin Electric Pauer Co 3pp 1 5036 316 24X 
Fiche 50-266. B2/10/19.B210270S94 

--B2I0270H97 Amend* 65 t 70 to Llceniet DPR-24 t DPR-E7, respect ivelij. 
allotting T lai-stl on of monthly turbine it op S< governor valve 
tiiti during end af cycle operation 

CLARK, R A Operating fleactor Branch 3 92/10/15 7pp 
I5S3& 3JS H4X Fiche 30-366,62/10/15-6310370391 

B2 10270302 Safety evaluation supporting Amend* 65 t TO to Llc*nc.ia 
DPft-24 & DPR-27. respectively 

aeficR af NuclHar Reactor .Regulation, Director 82/10/15 Kpn 
15836 323 24K Finne 90-266. a2/lO/15.B210B70294 

5210270303 Notice of liuanc* 6 availability of Amend* 65 t 70 to 
License! DPR-24 & DPfl-27, resp ectlve li) 

CLARK. R A Operating Reactor* Branch 3 62/10/15 Spp 
13036 327 24X Flcln 3O-264, 93/IO/1S, B21 0370294 

5210260476 Application to amend Licenses DPfl-24 & DPR-27. r*vi 1 1 ng Tech 
Spec re administrative control of hiofi radiation great 
FAV.C H Wisconsin Electric Pousr Co 83/10/19 DENTQN. H R 
Office of Nuclear Reactor Regulation. Director 2pp 1SBQ6 933 
24X Fiche 90-266rB2/H>/I<J,B210260476 

B210S60479 Proposed Toch Spec change* Incorporating revisions re 
administrative control of high radiation areas 

Wisconsin Electric Pouuer Co B2/10/I9 lp ISSOi 235 24X 
Ftchi 50-266, 82/10/19, B2I02C.0476 



-BI0727D179 "Shaking Tabla Study of SinglB-BtDfu Maianru llnui.. u,i , 
Tf*t Structure* J i 3 " V i.v i 

CULKAM, P , HAVES.R L , CLOUGH.R H California. Um v of Brl.i 

UCD/EERC-79/23 V01 79/09/30 275pp Availatl, at HtlS 
09132 277 24X Fich 50-266, Ql/07/ 1 7, BIO727QI56 

-9I072701B2 "ShaUng Table Studg of Slnale-Btopy Maonru Mount. ^oll 
T*t Structorei 364" 
aULAH, P . MAVeS.R L . CLOUOH.R U California, Unw ol, Brl.l 

UCB/EERC-79/24 V02 7^/07/30 300pp O9153 IBfl a* 
Fiche 50-264,61/07/17. BI07270I56 



-S107270195 "Shaking Table Study nf Bi ng la-StDry HSSOTIFV tlouw 
Sunm.irg.CeinclulDn9 t Recommendations " 
CLOUOH. R H , HAYES, R L , OULKAH. P California, Univ ol, D 

UCB/GERC-79/23 V03 79/09/30 HOpp Available al WTIB 
O9IS4 07B 24X FichB 50-266. Bl /07/17. Q1072701S6 



-BI0727OIBB "Cyclic Shear Testi of Maionry Plon.Vol J - T..[ n,, i t . 
MAVEa.n L . OHATE.Y , CUOUOH. R W CflUfornla, Unlv of, B.ri.j.. 
EERC 7fi-B 76/09/31 lOSpp 09154 1B2 24X 
Flche 50-266, 81/07/17,0107370156 

-B10727019I "Cyclic Shear Teit of Masonpy Pler,Vol B - rtrnkii.tP 
Teit Riults " 

MAVES.R L , OMATE.Y , CLGUOH, R W Califnrnia. Un lv nf, D.tlrU, 
EERC 76-16 76/06/30 78pp 091S4 2BB 24K ' 

Fiche 50-266,31/07/17. 8107270156 



--Bi07270l E H "Strength of Timber Roof Connectioni Subjected to 

CULKAN.P , MAVES.R L , CLQUGH, R M California, Unlv e f, t 

UCB/EERC-7B/17 7B/09/30 I71pp 09133 003 24X 
Fiche 50~2t6,Bl/07/17pBlO7270156 



&2105SOE?5 Application to amend Licen<ii DPR-&4 * DPn-27. -changing Tech 
Spect re ra<tu iremants for periodic leakage rate taiting of 
containment airlock door* Class I d 1 1 amend ftix encl 
FAV.C H Uiiconiin Electric Powr Co 92/IO/al DEMTON.H R 
Office of Nuclear Rraetcr Regulation, Director 3pp 1 5B37 B72 
Q4X Fiche- 9-0-266,32/10/2 1 , 92102B02-95 

S3103BQ29B Tach Spec Chan 91? Rebuilt ea,chaninj requirements (or 
periodic leakage rate testing uf containment air lock doori 
* Hifconiin Electric Pomer Co S2/LO/21 4pp 15837 275 24X 
Flchn 50-266^2/10/21.9210280295 

B2 102 9 0394 Providn ritults of cnnf Irmatoru 'nalijili drmnnitrat Ing 
tli it unacteptabl* radioactive rla*f from containniint 
would not take place a-l remit of (mail t>r*k LQCA In ujilch 
operator action re^ulr-ac 1 fladloactlve releaie negligible 
FrtY.C H. WUconfln EUctnc Power Co 02yiO'/22 CLARK, R rt 
Operating Reactors Branch 3 lp 15B53 135. 24X 
Fichu 50-256. 82/10/22,9210390894 

Intpectmn reparti< IE Sulletini (. carrei pondtnce 

810.7270154. Foruardi ad-Jl info in response to IE Bulletin. GO-1 1 re 
iMftmry uallt Thirteen rapts fc 109 averilia drayinji enc3 
Aperture card* am available In PDR 

FAY.C.W Wliconiin Electric Pouer Cg. BI/O7/17. DEH10N.H R 
Off(c< of Hut laar Reactor Rejulstlon, Director, CLARK, R Qperatinj 
ReJicton BrTieh 3, 17pp. Available at NTI9 09151. 026 2 + X 
Flchi 30-2i6, B1/07/17.B107270156 



-8107270! 61 "Modal Canbribution to Dyti*mit Analijaii HuHi " 
Computech Englnearins Girvitft. Inc H353 03, Ql/07/31 
Q9131-04& 24X Flehe SO-J66, BI/07/17.8I072701B6 



HSpp 



-B107270166 "Cyclic Laadinj T(*t of Monru Blngle Ptr,y-i>l 1 - Haloht 
to Width Ratio of 3 " 

HIDALOO.f A , flAVES.R.L , HCHIVEN, H California, Ujiiv at. 
Berlitl.u UCfl/EERC-7B/a7 V01 7B/U/30 I41dp Available t 
MFIB 091S1-1SB 2 Flcht BO-S66, 81/07/17, 01078701 36 

-31Q7S70U9 "Coellc Loading TeE of W.ionr\| QingU PlBM.Vol 2 - H.iaht 
to WJiJth flatio of I. " 

CHEH.B J , HIDM.QQ.P A , HAVES, B L California, Univ of- 
BerU V , UCS/EEHC-TS/aa V02 7B/18/3I. IBSpp O915I 390 3 
Fiche, 50-366,81/07/17, B107270JS6 

-8107270174 "Cyclic Loaillna Teiei of Haionri| BlngU PlemVol 3 - Htiolit 
to Width Ratio of 05," 

HIDrt(.ftO,P A , MAVEaJfl L , MCMIVEH, H D California, Wntv or, 
Berleltj UCB/EEnC-7?/l2 V03 77/05/31. l&4pp Av*ilab} t 
NTIS 091SB 184. 24X Fiche- 30-346,81/07/17,8107270136, 



ei07270i7d "Literature Survey Transverse Strength of HaonTu 
GHATE.Y . MAVES.R L , CHEN, S J California. Unlv of. Drr 
UCB/ERC-77/07 77/O3/3I 119pp 09155 110 BIX 
Fiche 50-2i6,BI/07/17,B1072701S6 



81 07270 19B "Literature Survey Compres s 1 ve, Tensi le, Bond j, (l 
Q f Masonry " 

HAYES, R L , CLOUGH.n H California, Unlv of. aerially 
75-15 75/06/30 2l2pp 09155 2B6 24X Fiche 50-BA6, 
B107H7013& 



--8107270199 "B tate-of-the-Art in Seismic Shear Strength al Httt-i, 
Evaluation d Revieui " 

HAVES, R L , CUOUOH, R W California, Univ of, Qarkeliy Eih, 
75-31 75/10/31 H7pp 09156 135 24X Fiche SO-2i D .ul/OJJI ' 
8107270196 



6210070007 Responds to F01A request for eight tatsgorUt ol rtrorJl' 
steam generators & iteam turbines App A documents provide! 
In R Vdell FQ1A Requeit Sl-313 Forwards documents llitfd In. 
App D, 

FELTON, J M Division of Rules and Records BH/OQ/ 1O LOW. C J 
Wlnthrop. Stlnuon, Putnam (< Robert* 9pp 1564S 063 B*K 
Fiefi* 50-OOO. u2/OB/10,82iOO70007 



3210070139 Forwards tabulated data on tteam generator inij I wi 

^a^llitlei Data should be provided to licensee) 
IPPOLITD.T Operating Reactors Assciiment Branch 02/04/01 
VAflOA,8 apefating Reactors Branch I. 5pp ISft^S 13] 3r 
Ftche 50-000, S2/QB/1Q, B210070007 

8210070172 Foriuerds info re steam generator integrity t, Inifl J 

operatins PWR,per 750330 (. 21 requests Details of ftufi, 
including defect Indications, tube plugging criteria 1 UIIL 
plugged y{ 1 1 not be provided except for Point Beach I 
OOLLER.K R Division of Reactor Licensing {NnR-1173 onl(l 
79/03/24, MACCARY.fl.R Division of Technical Revltw )|ffl!-l*l] 
onlyl Spp 15645 196 24X Fiche 50-000,82/00/10, t 



S210O404H Forwards Amnili 63 ti 6B to Licenses DPR-24 b DPS-IT. 
Tipectivlu. *afetv evluatlon << notice of iisuance t, 
availability Amends rtvlie Iniervice imp Tech Specs 
CLARK. R A Operating ReacUr* Branch 3, 08/09/31 FAY,* U 
Ulicontin Electric Pouer Co Spp 15597 134 34X 
Flche- 90-266J B2/OB/31, 8210040414 



-B210040420 Amends 43 & 6B to Licensee DPR-24 t DPR-27. rn>U 
reviiinj language of Tech 9peet re iniirvici Intp 
requlrtwenti of lafety ctacs components to conform 
U/10CFRSO. 53 

CLARK, R. A Operating Reactor* Branch 3 92/08/31 lt>r 
1S3?7 137 B4X Fiche. 30-266, 82/08/31,9210040414 



-B21004D4SS Baf*ty evaluation supportino Amends 43 t> iB to Us^ 
DPR-24 1. JJPR-27.repctively, 

Office of Nuclear Reactor Regulation, Director 3/01/11 
1S397-1SS.. 24X Fiche 30-266.02/00/31, B2100404M 



DOCKETED ITEMS 



111 



--204210571 "Point Bsach Nuclear Plant Units 1 1 2 Inserviee In*p 
Program Technical Evaluation Ropt " 

* Sclent? Applications, Inc NRC-O3-B2-096 8A1-1B6-02B-23 
B2/04/15 NHC - No Detailed Affiliation Given 20pp 

I55?7 159 24X Fiche 50-266, 02/08/31, B21004O414 



3pp 



Notice of usuancB S< availability of Amend* 63 (c 68 to 
Licensee DPB-24 t, DPR-27- respec ti ve lu 
CLAW,!? A Opsrating Reactors Branch 3 B2/OB/31 
Ficha 50-346,82/09/31,8310040414 



B2 100 4 0333 Updated LER B2-003/OIT-1 on B307S7, d i ecovered S of 3 level 
instrument* on C baric AC id storage tank powered from common 
source Cause not determined due to poor early maint of 
document* Miring corrected 

FAY, C W Hisconiln Electric Fouler Co BS/Q1/S3 Region 3, 

Office of Director 5pp I9616.O23 24 X Ficne 90-301,82/09/30, 
B31O060339 



T Hearing transcript* on non-antitrust matter* 



21GQ501S4 Forwards IE Inap Repts 50-366/83-13 (. 50-301/02-13 on 
920303-04 ft 0615 t, notice at violation 

^FPPLER.J Region 3. Office of Diroctor B3/09/1S BURSTEIN, 8 
Wisconsin Electric Power CD 3pp 15611 113 24X 
Fithe 5Q-246. H2/09/15, B21005O106 



8210080053 Transcript of B210Q6 telephone conference to diicun 
rescheduling of hearing in Wasd ing ton, DC Pp 1,342-1,352 
* Atomic Safety and Licensing Board Panel B2/LO/0& IBpp 
19643 2B4 24X Fiche 50-266, B2/1O/O6. 8210060052 



-S2100501"?.! flotice of violation from insp on 030503-04 t, 0615 
PEPPLCR.J G Region 3, Office of Director 83/09/15 3pp 
15f.ll 1IB 24X Fiche 50-36i, 03/09/ 15,6210050186 



DOCKET 50-302 CRVSTAL RIVER NUCLEAR PLANT, UNIT 3 

F Security, medical, emergency tt fire pro-tee t Lou plani 



-B2IO050S05 IE Insp Ropts SO-366/B3-12 L 50-301-02-12 on B20503-04 S, 
Obis Nontonpliarico noted failure to control access to high 
radiation areas ! failure to follow approved procedures 
LOVENDALE. P C , HrtGUE.fi L , GREGEH. L R Region 3, Office nf 
Director Q3/07/13 Spp 15611 121 34X Fiche 50-266,83/09/15, 
B21005Q1B& 



82 10270 229 Forwards IE Safeguards Imp Rept 50-303/83-17 on 630706-09 
& notice of v iolat i on. Not i ce of violation & rept detail-! 
withhold (re* 10CFR73.21) 

LEU 18. R C Division of Pro-ject V Rflildtnt Programi B2/07/S6 
HANCOCK, J A Florida Power Corp Spp. 15B23.O07 24X 
Fiche 50-302. 62/07/36.0210270329 



32 1 0050356 Requests relief from ASME Section XI. inservice inp 
requirements re frequency of reactor veifial interior elam 
FAV, C !J Wisconsin Electric Power CD 0S/09/39 DENTQNi H R 
Ofr-icB of Nuclear Reactor Regulation. Director CLARK- R A 
Operating Reactors Branch 3 4pp 15610 SBC, 31X 
FicSe 50-266,02/09/29,0210050356 



031037023? IE Safeguard. Imp Kept SO-SOa/BB-l? On B3Q7Ql,-Q1 
Noncampllance noted failirre to initiate adequate 
compensator v meaturei Oetaili withheld (ref 1OCFR7J 31) 
PERNV, C , MCOUlflE. D R Dlv(*ion of Engineering < Tochnical 
Programs B2/O7/22, Iji 19823 OO9. 34 X Fl ctia, 5O-302, B2/07/26- 
8310270229 



Saiiit ! ?066 I J FoTuarifs IE Inap Rapt* SO-266/B2-20 t, SO-30I/02-SO on 

No noncompl lanco noted 

S Division of Engineering I Technical program* 03/10/O4 
ECKSTEIN. S Uisconstn Electric Power Co Epp I573B 152 24X 
Ficde 50-266,02/10/04,0210190669 

S2IOI9067S IE Imp Repts 50-266/82-20 & 30-301/02-20 on B20914-16 
Mo nonconp 1 lance noted Major areas inspected surveillance 
fr calibr jirocedurea !< performance historij 

HAS5F.R A , PEBCHEL.J H , HAWKINS. F C Division of Engineering fc 
Technical Programs 82/0?/29 4pp 15730 154 24X 
Fi Che 50-2i6, 03/10/04, 0210170669 



IE Info Notice 00-33. Suppl 1, "Leaking !< Dislodged 1-128 
Inplant Seod " Bvc li*t end 

COBfl.t ] D t vision of Fuel Facilities, Materials bOafeguards 

63/10/06 Consolidated Edison Co of NOLI York 66pp 15761 35O 

2-I< Fichc 50-000,62/10/06, B200190233 

0203190230 IE Bulletin B2-03, "Stress Corrosion Cracking In Thick- 
*Ja] !. Large-Diameter, Stainlesi Steel, Rec ircu latlon Bys 
Piping at a\tR Plants " Bvc list enc 1 

DEVOUNO.R C Director's Office. Office of Inspection *nd 
Enfarcement B2/10/H Consolidated Edison Co, of Neui York 

15S1O 133 24X Fiche 50-000.03/10/14,8308190230 



R Penoific operating reports & related correspondence 

B21O15Q15O Foi-uiaros monthly operating rept* for Sept 1903 

FrtY.C IJ Wisconsin Electric Power Co 02/10/11 Office of 

Nuclear Re-ac tor Regulation. Director lp 15697074 S4X 
Fiche- 5O-2-66. B2/IO/1 1 , S21013015O 

8310)50158 Monthly operating rept* for Spt 19B2 

FAY. C W Wisconsin Electric Pouer Co 82/10/04 8pp 13697 075 
24X Fiche 30-266, B3/10/1 1. S2101501 50 

5 Reportablo occurrenies. LERs (< related corre*pondence 

a2lOlEO3BO Advises that operator action necessary to protect B&U plants 
from etce-ssive feeduater transients BtW plants do not employ 
niS/i ste-am generator level turbine or reactor trips to 
protect against transients 

CREENELL. J S Director's Office. BO/09/12 MICHELBON, C, 
Director'-s Office 34pp 15689286 24X Fiche 50-327,50/09/12, 
831OI2O390 



B310240370 Ack receipt of BSOBSB Itr informing HRC of i-tepi taken to 
correct violations noted in IE Safeguards Insp Rept 
5O-302/B2-17 Enc 1 containing BaPegudrdi Info withheld <ref 
1OCFR73 SI) 

LEWIS, R C Di viiion of Project & Rttidint Programs 92/09/17 
HANCOCHrJ A Florida Power Corf 3pp. I5SO4 HSS H4X 
Fiche 50-302,02/09/17,8210260370 

B210260377 Forward* rasaonse to NRC B2O736 Itr re violations noted in 

IE Safe-guards Imp Rept 50-302/02-1 7. Deta i 1 uilthheld (raf 
10CFR73 21 d IOCFR2 790) 

DAVWARD.P V, Florida Pouar Corp 92/09/33 O'REILLY, J F> Ktalan 

2, Office of Director lp, 159O4 257 24 X Fiche 30-302.83/09/174 
821O2&0370 

3310010379 Ack receipt of B2O907 Itr informing NttC of ttejm taken to 
cornet emirs incy planning tef icienciei noted in IE Inij> 
Rept 50-303/62-06 

LEWIS, R C Division of Project - Resident Proorami B2/09/20. 
HANCOCK. J A Florida Power Corp lp- 19973-053 24X 
Flche 30-302, 02/09/2Oi 821 C-010379, 

B21O010044 Ack receipt of B 20701 Itr Informing NRC of ctp taken to 
correct emergency prepare ilnest deficiency noted In IE 
Emergency Pre paretfness Appraisal Repb SO-302/B1 ~14 
LEWIS, R C Division of Project & flvidnt Programs 82/09/23. 
HANCOCK, J A. Florida Poutr Corp lp t35A3-32O EJX 
Fiehe SO-30S, 02/09/33,6310010044 

8210010049 Respond* to NRC 810911 Itr re emergon-cy prp*redni 
deficivncg noted In IE fmergencif Preparvdnnai Apprajj*! 
Rept SO-3O2/81-14, Corrective act ioni naiii moteorologic*! 
tauer to be built ueit of plant. 

MARDIB, D 0. Florida Power Corp. 02/09/O1 d'HEILLY, J.P Rs-Qion 
2, Office of Director lp 19569 321. Z4X Fiche. 30-302, 02/09/22, 
&2 1 00 10044 

8210260-0-03 Releases public ver*lon of revised radiological emergency 
response plan 

FELTOW, J.M Division of Aulei and Record*. B2/10/09. Dacutnant 

Hanagomant Qranc^. lp. 19811,001. E4XFIch* 9O-30Si B2/10/O5, 
02 10240008, 

B210BA0010 Foruiarni public version of RevliLon 1 to radiological 
emergency nspania plani In retponio to NRC 82O40B Itr 
BAVMARD.P Y. Florida Pr.uep Carp, 82/OV/2B. O'REILLY, J. P. Region 
2, Office of Dlr-ctoT tp ISBI1 002, 24X FJchi SO-3O3, 08/10/03, 
B21Q2&OOOS 



B3lQQtO3S5 Fpfwarils updated LER B2-OOS/01T-0 

FAY-C H Hiconin Electric Power Co B2/09/2B, KEPPLER. J 0. 
Hug ion 3, Office of Director lp 15616 022 24X 
Ficll* SQ-3Q1, S3/09 /3B,S21004032S 



-8310260013 Public verilon of Revision 1 to r<J tologic*! nergincy. 
nsaani* plan. 

* florid* Power Corp. 83/03/27, SSBpp. 13S11 003 S4X 
Flche: 80-302, 82^10/05,6210260006 



112 



DOCKETED ITEMS 



3210260309 Ack receipt of G21OI5 Itr informing MRC at steps tat rn to 
correct violation* noted in IE Safeguard's Insp Rept 
50-303/02-17 

LEUJS.R C Division of Project 1 Reiident Program* B2/10/J2 
HANCOCK, J A Florida Ptwr Corp lp 138O2 361 34 X 
Fieh SO-30B.es/10/K3, 821026Q309 



9210260436 Forwards revmon to B20219 subroittal r caltuUII 
mea i ur emeriti of bui voliaget used to demonitrat* adequate 
of ilectrieal diitributton sys ' 

BAYNARD-P Y Florida Pour Corp Q2/10/19 STOLZ. J F n 
Reactors Branch A 43pp 13B06 246 24X Piche SO-3' 
B2 102 60 43 A 



B21036Q31Q Reipon,d tn riftC 020917 Itr re violation* noted in IE 
Safeguard* Imp dap* 50-302/82-17 Corrective actions 
uithhs-ld <nf lOCFflE 790 t 10CFR73 31) 

BAVNABD^P V Florida Power Corp 82/10/13 O'HEILLY.J P fltaion 
Z, Office of Diraitor Ip 19902 362 24X Fiche 50-302,82/10/52. 
U21O36O30 1 ? 



6210260423 flnoiti concurrence u/interim pUn to maintain linn LIU 
for ehitnfttru control in once-through (team genaraUhi In 
high energy lint itite during each startup until Unfurl V 
Condition reportid in LER 32-098 Amend tee ulll be itrit 
BAYMAHD.P V Florida Power Corp 82/10/22 BTOL7.J F Oernbix 
RiactQTi Branch 4 2pp ISflOA 313 34X FUhe 50-303, 
6210360422 vs. 



P Operating lic*na itaje docunfnti & torrsspondttic e 



82101BOO10 Faruar-dt raq.u*t -for tddl info r-o UnrnolvtiJ Safity t&nj 
B-34 rs aptrabilitij of pur^i v*lvpi 

STQLI.J F Operating Button Branch 4 52/07/20 HANCOCK. J A 
Florid* POUBP Corp 7pp 1S717 353 24K Fiche 30-302,02/09/20, 



B21020'i54 Upoatu itatui of ate-enfl task force *(Uon pUn Tin 
force "ctivltiei tiplctBd to be concludiif by 62123] Finj) 
refit ! rpcopnm*ndd Implementation plant will bt lobmlll.j i>.. 
930121 " "* 

&AVHARD.P Y Florida Power Corp 82/10/22 BTOUI. J F 0>ifjt - 
R.aetort Dranch 4 3pp 1SB07 120 S4X Fithe 30-30?, 
821Q2AQ4S4 



92101 BOO35 Adviiei that plant emergency ftiduater automatic Initiation 
!< flou Indication l/s ccmpltj u/NRC 1 ong-trm af Btij-jrade 
requlr emeriti u/ iceptiofi re control room indication of 
ov*rr id Ing automatic Initiation capablllt^ 

STOLZ.J F OjBrating Reactor* Branch 4 02/09/27 HANCOCK., J A 
Florltf* Fotutr Corp 7pp 1374i S60 S4K F(ch 50-302. B2/ 09X87, 
B2 101 BO 035 



B210SfiO*97 Submiti response! to End l.Quvitioni 1 i, a in. MHC 3". i/i 
Itr re Oetiiric Item 0-24i "Oprability of Purge Vlvi " *" 

H/flvi overiite drauilng* Apirtur* cardi are vat|at>l In 
PDR 
BAYWARD, P Y Florida Pouer Corp 82/10/22 370LI. J F 

Realtor. Drench 4 3pp 15809 B44 24X Flche SO-HOS. 

" 



Osirtt 



esoa 190290 "AuHliarg FeedyntiT Stfs Automatic Initiation t Ft ou 
Intfltat ion, Crigtal River Unit 3, " tvchmcal eviluation r>j>t 
KAUOHEFI'-J E Franklin IcntituU/Frjntl in ftaieirch Center 

(jHC-oa-79-i ia TER-cgsa7-28a aa/oe/17 KEH&ALL,R MHC - H 

B. tailed Affiliation OJvn Ibpp. l&74b 267, 24X 
Flche- 50-30Z. S2/&9/27, B2I01B0033 



B2IOOfi017e Submiti update to 601106 reipaniei T interim ra 
evaluation prosram itudg rttommendatj on* Mo further eatunenie 
offered 

SAYNAHD.P Y Florida Power Carp -B2/-09/29 STOUZ. J F Operatinj 
ntaetors Branch 4 9pp. lSi.14 01O 34X Fleht 3 0-3O2i 62/09/37. 
8210060190 

921. 00602 fc3 Submit* primary tut reiulti re ijiftrly goal for 
containment purffitig t (me. per TMI Action Item II E A S> 
baitd on data collected during 30-d*v tett period uhich 
began on 320723 
DWNARD.P V Florida Power Corp, 02/09/29 BTOLZ.JF, Ojiiratinjl 



Reaetor Branch 4 
EJ310QAQ263 



2pp 



[S6E1 063 



Flche 50-302, B2/0?/a?, 



8310150316 Elaqueitt aicmptLon from 10CFD3-0 44(c]G) lill) requiring 
rcdctar va*f 1 hia-3 -high point vent Altirnativ* Aiithod* 
for want performance provided in ufcil B10130 >u*m( ttal, in 
T(.one to HUflEO-0737, Item [I B.I 

BAVMAHB.P Y Florida Power Corft B2/10/1S. flTPLZ, J F Operating 
Reictori Branch A 3pp 15705'3B3 24X Fich* 50-302,62/10/12, 



Q Imptc tlon reporti, IE Bulletin! & correspondence 

B3100B001S Addl nsporne to FQIA request for 19 Cataaorlti of Hf* -i 
nuclear reactor events lc aafitg problem* Forward! dQcuflir.tt 
Jlitfl in App A Document! in App B camp let* lu ufthhild trtt 
Ft) I A Emnptlon 9) 

FELTQN f J M Diviiion of Rules and Record) 92/07/13 UEflL I l 
Critical Maif Energy Project 9pp 1S665 OH7 B4X 
Fiche SO-GOOi 62/07/12, B2IOOB0015 

B2100B0125 Suttemitic ai B iment uf llcensne perfornjirii nolei n 
facility iwalmtion for Mai; t97*-Apr 1930 
* NRC - No Ditallad Affiliation Given BO/04/3O 7 5 B 
13667 327 24X Ftche 30-000, B2/07/12, B3100B0013 

B210270239 Foruardi IE Saf.guardi Intp Rept 30-303/02-17 on OJOIrt 7 
* notice of violation Notice of violation fc rept dftaLli 
ulthheH Cref 10CFR73 21) 

LEWIS.!! C Division of Project (. Resident Program* NlCJ'll 
HAtJCOCK, J A Florida Power Corp 2pp 158H3 007 SI I 
Fiehe 50-302, B2/07/SA. 8210270229 

BS10270239 IE Bafegu^rds Insp dipt SO~303/BS-I7 on O^OJOh 07 
Noncompl iance noted failure to Initiate adequate 
eompeneafcor.) meatures Detail* withheld <rf lOCFn/.l 3IF 
PERHV.C., MCOUIRE.D R Division of Engineerlnj fc fithnUH 
Programt 88/07/83 Ip 13B33 007 24X Fieh 30 JM.eJU'.i 
8210270229 



6^10190691 Provide* addl Info re oe calcjlationi for NURE8-0737, Item 
It B a, " Oaatgn Of Plant SMelding k Environ Qualif icit ion 
af Equipment fc-r Spacet/Biji Which M*u Be Uie-j in Pot- 
Accidgnt Operations " 

Y Flopids Powr Corp B2/1Q/12 BTOLZiJ F OparatinB 
'ranch 4, Sop 15736 201 24x Fitha, 30-30&, 92/10/18, 



B210340370 Ac k r*cei|>t of BHOflas Hr informing NfiC 0* itii l.hi. 
correct violations noted In IE Safeguard* Imp Dipt 
30-303/82-17 End eontaininj iafgttar*Ji info ulthhald Irtt 
10CFJ173 81) 

LEHI3,R C. Division of Project t Resident Proorami 07/09/1) 
HAHCOCKrJ A Florirfa Pouor Corp 2pp 13Q04 33D S4j 
Ftth* 00-302, BS/09/I 7,6210260370. 



^erm uork schedule re NUREO-ObSO, 
"lodels for LCKA AnflIi;- It. " not 
14 to tncanplfte thort-tern 
'd u/MRC tprvl of rept 
ifp B2/10/14 LAINA8, 8 C, A.. It taut 
, lp. 13739' 143 2 



8810260377 Forwards response to NRC 820726 Itr- re violiUa"! s,i 
IE Safeguard! Imp Rept 30-302/82-17 Detail* wltMitlf trtt 
10CFR73 SI ti 10CFR2 7fQ) 

8AVNARD', P Y, Florida Pouitr Corp B2/OB/33 D'ftE]U,V. J f r^ 
2, 0*fic of Director ip 13B04 H37 24K FUhi JO-3M.K1' 
82103^0370 



visan licensed at senior 
b WflEO-0737, 

EIBEMHUT, D C Division 
">S, B2/10/1S, 



8210010379 A.ck ricelp* of 820907 Itr inFormlnj NRC of iliii 1U<i n 
correct amergencv planning deficiencies noted in IE Enti 
Rept 90-30S/B3-08 

LEWIB,fi C Division of Project lc Resident Prooram df/Ct'l! 
HANCOCK, J, A Florida Pouier Corp Ip. 1SB73 DBS, 3 
Flehe 30-302. 08/09/80,8210010379. 

8210010044 Ack ncelpt of B20901 Itr informinj NRC of ilfll Uln 
correct m*rg*ncv preparedness deficiency notej in IE 
Emaratncy Preparedness Appri*l Rapt SO-302/81-U 
LEWIS.R.C. Division of Project fc Resident Progr*i 
HAHCQCKiJ.A. Florida Power Corp Ip 13363;3-aO 241 
Flchi 90-302i 82/07/S2, B310010044 



DOCKETED ITEMS 



113 



Responds to NRC 010?11 1 tr re emergency preparedntss 
deficiency noted in IE Emergency Preparedness Appraisal 
Rep-t 30-3Q2/B1-14 Corrective actioni ntui meteorological 
>touer to be built west of plant 

MARDES.J) Florida Pouar Corp BS/09/01 O'REILLY.J P RegUm 
2. Dfflcn df Director Ip 15565 321 24* Fiche 30-302. 92/09/22, 
9210010014 



Discusses potential problem re Squoyah realtor pressure 
noaile, su-pp lementing 800222 memo Underelad cracfc* found by 
uit of ultrasonic equipment Add 1 items of recant origin 
discussed Related info- enc 1 

DENTON, H fl Office of Nuclear Reactor Re-su !**><">" Diractc-r 
flO/oa/Sa AHEARNE.J , QILIHSKY.V . KENNEDY, P Commi ssianer* 
<?pp 15727 170 24X Fiche 50-CKK), ft2/OA/2a, B3100(QOGB 



aSOSl10233 IE Info Notice QO-35, Suppl 1, "Leaking tc Dislodged 1-125 
Implant Etetfs " Svc lut encl 

COaa,L I Division of Fuel Facilities, Material! b Safeguards. 
BS/lO/Oi Consolidated Edison Co of Nuu Yor* ifipp 157fil 250 

3*f Ficb* 5Q-OOQ,H2/lu/06,820Bl 1 ?0233 

6208190236 IE Bulletin 03-03, "Struii Corrosion Cracking in Thick- 
Hal 1 , Large-Diameter, Stainless Steel, Rec ircu lation Sijs 
Piping at BWfi Plant; " Svc list encl 

OtVQUNQ.R C Director's Office, Office of Inspection and 
Enforcement BS/10/14 Consolidated Edison Co of Neui York 

115p.p 15310 123 '34X Fiche 50-000, B2/1Q/ 14, 820BI9033B 



V receipt of 821015 Itl- informing NRC at steps taken to 
correct violations noted in IE Safeguard! Insp Rapt 
5Q-302/B2-17 

LEWIS. R C Division of Project t Resident Programs B2/IO/22. 
HANCDCK-J A Florida Power Corp Ip I SBO2 361 24X 
Fiche 30-302. HS/1O/23, B21QS60309 



Reiponds to NRC 320917 Itr re violations noted in IE 
Safeguard* Insp Rapt 50-302/82-17 Corrective actions 
JiCKnald (ret 10CFR2 790 & 10CFR73 21) 

GAVMAFtD.P V Florida Power Corp 62/10/15 O'REILLViJ P Rofl'an 
S. Qffift of Director Ip 1 5B02 31,3 24X Fiche 50-303-02/10/23, 
B2 1 0360309 



S Rpportabli 



UER* Si related correspondancg 



DISCUISHI docaij heat closed cycle cooling uiater pump motor 
being out of tpec Caused bv inadequate lubrication Problnm 
highlight? vu 1 neralu 1 1 ty of nuclear power plants to 
i n ad -equate lubTlcation Sped & uiarl order encl 
ORWSTE1N.H U Director's Office BO/03/20 MICHELSON.C 
Diret(c,r'-3 Office 4pp 15649 337 24X Fiche 30-302,80/03/20, 
8001020420 

631Q12O3BO Adv'iies that operator action nectrssary to protect UIiH plants 
from BiCBtsivv feailijater transients DtiH plants do not employ 
Mgh steam generator level turbine or reactor trips ta 
.protect againit transients 

CAESUELL.J 3 Director's Office BO/09/13 MICHELSdN, C 
Director'! Office 34pp 1S6S9 23(, 24 X Fiche 50-302,60/09/12, 
8210-120300 

Q&1O23O435 Foruards jummari) of B00930 transient, all igator cllf event 
While at 19^ poiuer, instruilient test 1 eadi fell causing 
fetduatBr runbact d control rod insertion 
DRNSTEIN. H t Dinctor'i Office SO/10/08 HICHELBON.C 
Oirvctor'ig Office 3pp 15693 265 34X Fiche 30-302, 00/IO/Ofl, 
BOIQ33Q433 

3013290! IB Dlacutses conclusions of engineering evaluation of ttcam 
gene<ratar overfill transients *t C-E ti West inghoue plants 
1-AtJMJtje, g D Director's Office BO/10/29 MICHELSON, C Director's 
Bttitt 3pp 1S693 263 24X Fiche 50-000,00/10/29,8012390110 

J31OO1O008 Responds to FDIA request for 19 catigories of documents re 
nuclear reactor events t safety problemi Forwards document* 
] i t t*J in App A 

PEL TOW, O M Division of fiul.i and Records 82/06/BB UDEtL. R- A 
Critical Mass Energy Project 15pp 157S7 005 24X 
Flctit &O-000, 62/06/20,8210010000 

-~BlOibl5O5S5 Informs that ESFAS relay failure revieued to dit'rmlne 
significant number of fai lurei, safety consequences & 
nu-at if ica Stors of E8FAS ralayi Failure considered simple 
isolated gvtnt fc does not uarrant further action 

LAINAS.O C Assistant Director for Safety Asieisment SI /OS/OS. 
EISEMHUT, t) Division of Llcenilng 2pp 1S730 137 2<4X 
Fiche 50-000,92/06/28,8210010006 

aiO9QB&417 Cod-eludes that no addl actions are required re en8in*red 
safeguard* relay failure* Various relayi, Including nau 
Cr^don relays, should be monitored as watch list item* 
Failures *fter Sept 19B1 outage should be reviewed 1 
CH1RAMAL,M Director'! Office Bl/OB/ZB MICHELBON.C 
Director'* Office 2pp 1S730 12B 24X Fiche 80-000, 02 /OA/ S3, 



9310130310 Forward! tER 8a-045/03L-0 

HANCOCK, J A Florida Pouer Corp 62/10/O1 O'REILLY, J P *" 
B, Office Of Dir.ctor Ip 1367B 333 S4X Fich* 50-302, 62/10-/OI. 
B21013O310 

BB10130319 LER B2-O45/03L-O on B2070i, emeTfl nncj foeduoter ultra&onlc 
flou' irdicator FW-313-FI ditcovered innpsrablo & train 
arbitrarily declared innnsrable Caused bij fntlod power 
sucply-Pouer supply raplacul t indicator repaired 

FORP.EW Florida Po-uar Corp 83/10/01 Region 2, Office of 

Dir*ctor 2p p 19670 339 24X Fiche 50-302, 62/10/01. B210 13031O 

8210130320 Forwards LER 82-057/03L-0 

HANCOCK, J A Florida Payer Corp US/lO/Ol O'REILLY. J P P?9on 
2, Office af Director Ip 1S69S 352 24X Fiche 50-302,92/10/01, 
B21OI30920 

__ B210130930 LER 82-O57/0-3L-0 on B203B7. con ba inment isolation valvo in 
ivc uioter ays (BWV-t 1 ?) not strofce tin* teitad follouino 
maint Canned by parsonne.1 failure to include etrokB time 
testlno in uark request Maint planners instructed 
FORD.E H Florirfa Power Corp. BB/10/Q1 Rejton 2. OFFIcs at 

Director 2pp E56BS 353 3 Fiche 30-302,62/10/01.6210130320 

S21O190A77 FariiiardB LER 92-05B/OIT-0 

LUTKEHAUS.TC Florid* Power Cc-rp B2/10/03 O'REILLV, J P Regian 
2, Office al Director tp 13730 162 24 X Fiche 30-303,92/10/00, 



e210l'70iiB7 LER B2-09B/O1T-O on 620924. value lineups Hantiflei) which 

allo-u onco through steam jenerator drain lines to oe usd 

for blnudoun operation* it alo sllowt high energy fluid 

through line* Cauaeif bu inadequate review of sys dstign 

UILSDN.K R Florida Pou&p Corp Q2/1O/OS fleoion 2, Offico of 

Director Spp 1573B 143 24X Fiche 30-302,92/10/06,9210190677 

92101*70271 PNO-IE-B2-113 on B21014,rle In, airborn* radioac tivi tij 
level* In reactor bldg detected Caused bu leak in vicinity 
of reactor coolant drain tank Unit shut doum & will b out 
o-f vc tar about 3 w*i to invBttijata t> repair laaV 

RQOOE,J F , BRDWNLEE.V L Rogion 2, Office of Director 82/10/13, 
2p 15737311 24X fiche 50-3O2, BB/ 10/13. 9210190271 

B31Q820052 Forwards LEU B2-039/03L-0. 

HANCQCK.J A Florida PDUmr Corp B2/1O/13 O'REILLY.J P floginn 

2, Office of Director Ip 1S77B2O7 aiK Fitlio- 30-30-3, B2/ 10/ 1 3, 
9210220092 

921O22Q03fc LER B2-059/O3L-Q on B20915. valve DHV-tll an decay haatline 

D ttlltt to control Flaa Caused by inoperable flnu switch 

Buifich replaced S. eUir 6 DHV-1U functionally tested 

u/satiifactoru rasults. 

HUftHeS.P.O Florida Pnuer Corp 92/10/15 FUgian 2, OfUct of 

Director Spp 1577FJ: SOB 24X Fi ch- SO-302, B2/10/1 S, 0210220033 

0S10290186 RQ 92-O5Bvhigh anergij lines exist in reactor bldg Study 
on rtf training line* fur pipe uhip comp leted. Al tornafclvs 
under review ftaquests approval to maintain lines tmbll 

BAYNMSDiP Y Florida Pouer Corp B2/lO/a HTOLI, J. F Opsvatlng 
Reactors Sranth 4 2pp ISB53 309 24X Flch* 30-302, SB/ 1O/ 22, 
S21O29O166 

B21O2903ia Informs thJt special rept sup.po*edlv ancl In 021001 
submitted LER B2-049 dvtfrrnined to be mom uteFul as battl* 
of Tech Spc change reniuvst ta b* lubmlttsd *t lflt*r <lat. 
BAYNARO.P V Florida Fouier Corp. B3/iO/25, D J RILLY, J P- ReBlon 
2, Office of Director tp 13B53, 1S8 24X Fiche 30-302,62/10/23. 
B21029O312 



DOCKET SO-304 ZION NUCLEAR POWER STATION, UNIT 8 

F Security. meilUalr amerganty li fir* protection plans 

B209290125 Relaaifs public version af revised ganerating itttLon 
emerg'Tici) plan corporate command ctr emergency plan 
implementing procedure. 

FELTONj J M. Division of Rules and Rcord B2/09/1A Dneumsnt 

Mananenant Branch lp- 13Si4, 122 24X Flehe: 5O-OOO. B2/09/14, 



114 



DOCKETED ITEMS 



8209290199 Forward* public verilon of Revii ion 4 to generating Italian 

emergency plan corporate ccfunand ctr Etoergencij Plan 

Implementing Procedure EGF-3. "Environ/Emergency 

Coordinator " Receipt form tncl 

PAJOHSHI.J E CcmirLanwaalth EJHon Co 82/09/01 DENTOW, H R NBC 

- Ha Detail d Affiliation Oivin lp 13344.123 S4X 
Filh 50-000, 82/09/16, 8209290123 

8209270229 Public venion of RrvHion 4 to p.tirating itation 
mtrgenEV plan rorporate command etr Eflirgintg P>" 
Implementing Proc*<fure EOF-a, "Environ/Ernei-jencY 
Coordinator " 

PAJOWSKI.J E Commonwealth Editcn C& 02/06/31 Upp 
1356.4 124 24X Ficho SO-000. 82/09/ 16. 6309290123 

B2100BOQ29 Rdleaie-i public vsnion of rtvition to emergency plan 
imp 1 mien t ing procedure 

FELTON.J M DlvUIon of Ruin and Birordi B2/09/22 Document 

Management Branch ip 1 5oA9 307 24XKiehi 50-893. 6 2 fOt/ S S. 
83 1 0080027 

6210QB003Q Foruirdi public veriion of Reviiion 3 to Emtrjeney Plan 

Implementlnc Procedure EPIP 530-3. "Radiological 8upp|iei 

for Medical Emergenei*! " Receipt form end 

PLIML.O Commonwealth Edtlon Co 62/09/07 DENTOM, M R NBC - No 

Detailed Affiliation Olven lp 15449-303 24* 

Flche- 30-295. B2/09/22. 8210060089 

S2100B0031 Public version of Rvlilon 3 to Emergency Alan I nip lamenting 

ProteJur* EPIP 390-3, "Radial og leal Supplit* for Htdical 
Emirg inc iB " Proee^uro changi r(q.unt farm ancl. 

* CoiMiontiitjitf. Edlion Co S*/0?/03 Bpp 1S649 309 24X 
Fleht 30-295,82/09/22.8210080029 



ForuiarJi rvled inmotion. rtqusitt from provlilans of 
lOCFRSO.App B.Bictlon HI. Sri p&ft-firt ihutdouin 
capability, ptr 6209(7 tslcon 

LENTIMC.FO Commonwealth Edii on Co B2/10/01 DEMTOH, H R Officr, 
of Nuclvar Riactor fijultion, Dlrtctor. 30pp. 15tll 066 SIX. 
FEchl 50-293, 98/10/01,3310050207, 

8210l3037i Advil!* that InmtalUtton of offilti dot* calculation njo 
program fully oparatlonal t Tiding modal t oparattonal 
A-mo-fil ulll be daliijid until B21231 to conpliti (>rim 
computtr In-itallJticn 

BUART7,E D Camraoritfulth Edtion Ca BSflO/Ol, DENTON, H R Office 
of Hue Liar Rt actor Rtgulatlon, Dinct-OT 2pp 15iB2 098 StX 
FicFit SO-OOO. fl2/10/06tS2H3130376 

Q210290047 Ptltaiit public vtriion at rtviiiont to Qii*d Citi-ii. lion d 
Drafdrn cnxrgancq plan anniio 1 rtvinif jsntratina 
tation inifrganev plan taltphani dlractori/. 

FEtTOM, J II Divlilon of Rulti and Ritords B2/10/08 Documant 

Maiugamcnt Branch lp. 1SB77 313 24X Flchi- 90-000, QS/10/09, 
B2 10290047. 

BS103900iO Forward! public vtrilon of Rtwlilon 3 to Quad Cltlte S> lion 
i<n*rgani:v plan *nninii Rivliian 2 to Drnidin narginci| pUn 
annaiiRtvt* Ion to Byron vntrgincv plan mini t> rtyind 
gtntratlng ttition <an*r gtncv plan tiliphont idiractory 
HQQRE.R D. Commonuaal t h Edlion Co. SS/07/30, DEHTDN. H R NRC - 
Mo Dttallad Affiliation Otvin 5pj, 15877 G14 34 K 
Fichi 90-000, aa/10/08, B2I0290047 

6210390077 Public vanlon a* Rtviiion 3 to Quad CittM Zlon 
nrg*ticy plan annnaii Raviiicn 2 to Draiii*n inirganty plan 
annti ti Ravlilan to Bijron inargincy plan annvx 
Gommanunlth Edlion Co 62/06/30 323pp 19877,317 24X 
Fleha . 30-000, 82/10/08, 8810290047, 



6210230419 R*liiiii public veriion of ravind imarnincv pi in 
Inplimcnt ing proeidun 

FEI.TON.J M Biviiion of Rulai and Record! 02/10/1? Dotiii 

Hanagtmtnt Branch lp 15B60 001 24X Ficha BO-295, OS/ltl/l J 
B2102E0419 



6210280424 Forward! public vsnion of Fiaviiion 5 t 
Impliine-ntino Procufure 11O-1. "Station Dirtctor 
ch*ngi rq r uit 4 noipt form tnel 
PLIHLiO Commonutal th Ediion Co Q2/07/17 
Datilltd Affiliation Olvin 2pp 1 SBiO O02 24X 
FlcAf 50-299,62/10/12,8210280419 



II fl SPC 



B210280427 Public vrsion of Hviilon 5 to Emtrsncif Plan 
Procidur* 110-1, "Station Dinctor " Rtviiird irvtfai and 
Caimnonkinalfi Edlion Ca 93/07/16 5p p 15360 004 
Fleh* 50^295,62/10/13.6210280419 



Q2102S0442 Riliait* public vsrtion of ravind niBrgneij plin 
irnplifflf nt ihfl pructdurff 

FELTCW.J M Dlvliion of Ruin and Rcord B3/IO/12 Dmctfi 

Managimant DrBnch, lp 15839 001 24X Ficha 50-395, D3/10/IJ r 
32102B0442. 



9210280445 Faruardi public vinlon of Flivi* ion 4 to ErnT(in<i Pli 
Implmnt Ing Procsdure EPIP 3SO"S, "Environ E~mrgn-CY 
Kit b Emrg>ncv Oparationi Facility Radiological Cqutpntnl " 
R*c*lpt form tncl 

PLIMLiO Commanuaalth Ediion Co 82/09/ 1O. DENTGJMI Ft If: 
DtUUad Affiliation Oivon lp 1 5059 002 34 X 
Flchi 50-275,62/10/12,6210260442 



82 10280 4 47 Public version of Rsviiion 4 to Em*roan[g Plan 

Implementing Proctdur EPIP 330-2. "Environ emBrjanig K1( I 
Emirgincij Operation* Facility Radiological Equipment * 
Pro-odurt changi riqueit form tncl 

* Commonunalth Edison Co B2/09/03 8pp 13059 003 HI 
FUhe 50-295,82/10/12.6210280442 



D2t022035Q Providt* Info re organiiation 1 pa vf ormant > of J-iptl 
raiponlibli fur radiation protection ac tivi ti*, per 090-703 
coraml tment Training coordinator anigned In Apr 19GB ^o 
improve health phgiici training program, 

TRANM.T.R Commonuialth Ediian Co Q2/10/14 DEHTOW. HP Otti ' 
at Kuclaar Reactor Regulation, Dlracbor ?pp 1 37 74 IC7 241 
Fich* BO-000, 82/10/14 r 0310220338 

8210260405 Notification of 821026-29 nuetinot u/utll tc DNL In BHHi,i, 
MD to d lieu ii d reiolw* o.ueition* on propoeed mraption la 
fipp H 

WJOOINTONiD DperaUng Reactor* Branch 1 3/10/22 WMA.S * 
Opirating Reactor* Branch I 2pp 15859 327 S4X 
Flch* S0-a?9, 82/10/22,9210260409 



H Oineral carre*pond*nct 



8210210239 Commanti on facility operation NRC ihould d*n|| utU 
permit* 'on to ute high turnup nuclaar fuel Evidence 
luppoi-tlnp continued opiration of facllltg *houl4 b* 
provided to public 

QUIOOiC Pollution tc Environmental Problem*, Inc DSMOJIS 
Director'* Offic. OFfici of Inipiction and Enforcintnt }f| 
137&&.2S? S4X Fichl 30-295,62/10/11.9210210239 



D Advliorg Conmitti* on Reactor Safeguardi report* & 



8210270408 Commenti on probab i 1 litit riik *ittnm-tnt pr II II J! I 
inatl.0tn.tral mithod* b principle* emplatjed in analuili at 
poiiible earthquake ihaklng b lit* appear to apply mudirn 
itat* of art technique!, 

TREFUNAC.M D Sou thorn California, Univ of TRIFUNACiJID 
Aifvliorij Committee on Reactor Bafiguardi 92/O2/23 

ACRB - Advii-org Commlttie on Riactor Safeguardi 
24X Fich*' 90-293,82/02/23,8210270406. 



t. aparating Itcente itag* document* b correspondence? 



60071 S0303 Notlfin that revieu ulll be conducted of Dlfllsn I** 1 ' 

(hort-t*rm rtk itudiai uilng variou* rnourca*, In ruptnn 
to eOOiOS req.uet Evaluation uill be tubmitttd bi| 0009JJ 
MATTSOM.fi J, Dtvlilon at Safety Technolagv 30/07/03 
EIBENHUT, D. Divldan of Licenilng. 2pp. 02992'aOl. W 
Flehe- 30-847, 80/07/02,8007190303, 



8210070007 Reipond* to FOIA requeit for eight cjtijarlli *f 
ittan jenTfcor t> (team turbine* App A document! provlll 
in R Udell FDIA Requait 81-313 Forward* document! llltH 
App B. 

FEtTON, J H Dlyliion of Rulei and Racordi B2/OG/IO 
Wlnthrop. Stioiion, Putnam fc Robert! 9pp. 19MS:Oo<3 
FIe*e: 30-000, 82/08/10,8210070007 



DOCKETED ITEMS 



116 



-6203110403 Forwards response to OD Dume le, C hairman of Pollution Control 
Board, State of IL. questions In 820127 Itr 

JCHflSTQNpH V Assistant Director for Materials 1< Qualifications 
Engineering B 2/02/22 LA IN AS. Assistant Director for Safety 
Aiteiintnt 2pp 15643 12i 24X FichB 50-000. B2/OB/IO, 
G2 1 00 70007 

3^9160503 Suppls B20S31 Itr re 020903 meeting at Region 3 ofc 
Recent operation of Unit 2 u/tuio inoperable auxiliary 
* eed-uattr pumps added to agenda 

HEPPLERpJ C Region 3. Office of Director 82/09/03 HEED, C 
CiHr-aonuealth Edison Co Ip 14904 087 24 X FichB 50-295. B2/G9/Q3, 
B2Q9I40503 

31O04O218 Requeits rsaff irmation of technical basil for operation 
at tOOK oower Sianificant financial penalties incurred due 
to operation in overly conservative manner 

SriEDE.U L Commanuealth Edison Co 82/09/27 DEVOUN8, R C 
Ciroc tor 'i Office, Office of Inspection and Enforcement 3pp 
15533 115 24X Ficha 50-395,83/09/27.8210040218 

21OOBQI1I Forward* completion status fc revised schedule far 
Improvement* made to control room dlsplag since 1980 rept, 
p*r BO 03 3? conf irmatory order 

LEfjriME.f O Commonwealth Editan Co 82/10/04 DENTQN, H R Office 
of Nuclear Reactor Regulation. Director 4pp 13640 022, 24X 
Fiche 30-299. 82/10/04, S2100B01 1 1 

'IO13O1QS flequsts delay of impl ementfl tion due dates re MJHEC-0737, 
It (ins II B 3, "Plant Shielding," II B 3, "Post-Accident 
Sampling" t> I I F 1 ! "Noble Gal Effluent Monitor " 
SWAFJTZ.E D Commoniuealth Edison Co 82/1O/04 EIBENHUTi D 
Division of Licening 5pp 1S65I 237 24X Fiche 50-000,32/10/04, 
B2IOE20105 

'IO2&.O52& Forwards Revision 3 of Chapter 9 of "Offsite Dose 

Calculation tUnual " 

COLD EH. J C Commonwealth Edison Co SS/ 10/06 CASE. E O Office of 

Nuclear Reactor Regulation, Director Bpp 19805 137 B4X 

Ficho 50-COO. B2/10/06, B210260326 



B2101905AB Forwards IE Enforcement Conference t, Insp Repts 50-295/B2-19 
t, SO-304/B2-I7 on S2O717-090? S< notice of violation 
EPES gftRD,fl L Division of Project * Resident Programs B2/O'9/3O 
REED.C Commoniuealth Ediaon Co 2pp 1 5736 112 S4X 
Fiche 90-295,82/09/30,8210190969 

8210190579 Notice of violation from inp on B20717-OB31 

* Division of Project & Resident Programs 02/09/30 tp. 
19736 113 24X Fiche 30-295, S2/09/3O. B21 Ol 90SA9 

8210190599 IE Enforcement Conference & InP R'pts 50-275/82-19 & 
SO-304/B2-17 on B2.0717-OW? Noncomp 1 lance noted failure to 
follow 8C-022 1 ? conf Inflatory ordar requiring expeditious 
shutdown whenever au>iliary feeduater sys inoperable 
MATEftS.J R , SCHNEIDER, , REYES. L Rleglon 3, Office ',_,. 
Director 82/09/22 9pp 15736.114. S.4K Fl ch e. 50-295, 02/09/30, 
82101 9096B 

8210060399 Acli receipt of B20910 Itr informing MflC of steps taken to 
correct violations noted in IE Insp Repts 30-237/B1-39, 
50-849/01-32, 50-2S4/S1-23, 50-263/81-83, 50-295/81-31 & 

SPESSARD.fi L Division of Project ft Resident Programs, B2/10/O1 
REED.C Commonwealth Edison Co Ip 1S61B 354 24X 
Fiehe. SO-00&, 82/10/01, 8210040359 

821004.0367 Responds to NBC 820712 Itr re violation* noted in IE Insp 
Repts 90-237/B1-39, 50-249/61-32.50-254/01-23! 30-2A5/01-23, 
50-29S/81-31 I- 5O-304/B1-27 Corrective actions training for 
mot priorities re plant availability will b* conducted 
REED.C Commonuealth Edison Co 82/O9/10, KEPPLEH, J Roglon 
3, Office of Director 13pp 19iIB 395 24X 
Fiche 50-000, B2/10/01, B210Od0359 

B21008017S Foruiards listing of piping DS yhleh fall to meet FBAR 
requirements, per NRC 800918 confirmatory action Itr. IE 
Bulletin 79-14 operabilitv evaluation updates will not b* 
provided for Dresden (- fluad Cities Final update bij Dec 19B2, 
RAU8CH,T, J, Commonuealth Edison Co. 82/1O/O1 KEPPLER.JO. Ragion 
3, Office of Director ipp 15640:139. 24X Fiche 80-000, B2/ 10/01 , 
B2100B0178 



Revision 3 of Chapter 9 of "Offsite Dose Calculation 
Manual " 

Commonwealth Edison Co 02/09/30 03pp 15B05 139 24X 
Fithe 50-000,92/10/06.8210260526 

10220399 Suppis 820414 response to FranHtn Research Ctr Si 1003 draft 

technical evaluation rept re control of hnavu loads 

<tHJREQ-Qt,l2>, per 820854 b 25 telconi 

LENT1NE.F O Commonwealth Ediion Co 82/10/12 DENTQN, H R Office 

of Huclear Reactor Regulation, Director 3pp 15777 329 24X 

FAchff 50-275, S2/IO/I2,B2I02203v9 

1OI70443 Forwards juJdl info re NUREG-0737, I tern II B 3, "Pott- 

Accident Sampling Sija, " In response to NRC 820722 Itr 

UtiL currently pursuing possibility of developing procedure 

to ottintat* core damage via Hestinghouie owners group 

BHART2 f E D Commonweal th Edison Co B2/1O/13 EIEENHUT>D 

Division of Licensing ISpp 15741 187 24X Fiche 50-293,02/10/13, 

B21Q19O443 

1O37O344 NotiFication of B21115-16 meetings u/Util in Olen El lijnr IL 

to- discuss bates for current in*ervice letting proposed 

aiemp t ion. inc luding alternatives to required imps 

WlC-OrNTON.D Operating Reactors Branch 1 BE/10/22 VAROA, B A 

Qperdting Reactors Branch 1 Zpp 15851,354 24 X 

Ficn 50-299, 82/10/22, 8310370344 

Inspection reports, IE Bulletins tc correspondence 

IOO7OOO7 Responds to FOIA r*quet for eight categories of records re 

Itcain gencritori b >tem turbines, App A documents provided 

to R Udell FQtA Request 81-313 Foruardi document! listed In 

\fp B 

"ELTON. J H Division of Rules and Records B2/OB/IO, LOW, D. J. 

Vintfirop, Stlmson. Putnam ti Roberts. 9pp. 19645.063 24X 

rick* 80-000, 52/08/10,8210070007 

3B10O7O13? Foruiirds tabulated date on steam generator insp li maint at 
facitCEles Data ihoutd be provided to licensees 
IPPDLITO. T Operating Reactors Assessment Branch 82/04/01 
VARQA.8 Operating R*ctor Branch 1 3pp 1S445 131. 24X 
Ficft* 50-000,82/08/10,8210070007. 



B20Blf0233 IE Info Notice BO-35, Buppl 1. "Leaking < Dislodged 1-135 
Implant Seeds " Bvc list end 

CDBB, L I. Division of Fuol Facilities. Materials b Baf3Urds 
82/10/Oi Consolidat^J Edison Co, of NBU York fiApp 13761 E90, 

24X Fitb 50-000, S2/10/06r B20B190233 

S21O190613 Acl. receipt of S2Q91Q Itr informinfl NHC of steps ta* en to 
correct violations noted In IE Insp Kept. SO-S9S/B2-14 ! 
90-304/B2-13 Inttrpr-tatl on of Tech Spec 1 O. D unec|ieable 
SPESSARD.R L Division of Projct t Reiidnnt Programs 82/10/07 
REED.C Commonyealth Edison Co. Ip 1&739 361 B4!C 
Fiche 50-273, 82/10/07, BalOlTOiia 

8210190624 Responds to NRC B20B13 Itr re violations noted in IE lnp 
Rtptl HO-273/B2-14 fc 30-304/B2-13. Dispute s NRC 
eUsslficetion of 820625 reactor trip, Trip Inadvertent 
Interpretation of Tech Spec 1 D end, 

STIEDE.W L Commonwealth Edison Co. BH/09/1O KEPpLEfW. O 
Region 3, Office, of Director. 4pfl 1574O.O01. B4X 
Fiche' 50-293,02/10/07.0210190613, 

820B19023B IE Bultetin B2-03. "Btr-ess Corrosion Cracking In Thick- 
Wall, Large-Diameter, Btainles Steel, Reelrculation S-ji 
Piping t BWH Plant* " Bvc Hsfc end 

DEYOUN0, R C, Dirsetor's Office, Office op Inspection and 
Enforcement S2/1O/14 Consolidated Edlion Co, of New Vor Ic 

115pp. 15S10 123 24X Fiche BO-OOO, S2/1O/ 14r B20QI9023B 

B31O270344 Notification of B2-111B-I6 meetiTtg" W/utll in Olin El lyn. IL 
to discuss bases for current intervice testing propoferf 
exemption, InEludlno alternatives to required lns.pi. 
W1Q01NTQN.D. Operattng Reactor* Branch 1. 02/1O/22, VAROA, B.A, 
Oesretino Reactors Branch 1 2pp 1BB31-3S4 B4K 
Fiche: 0-39S 82/10/22,8210270344 

R Periodic operating reports t, related correspondence 

B21O19O4O5 Forwards monthly operating repts for Sept 190S, 

ORAESSR,K, U Commonwealth Edison Co, B2/10/Oi, Director's 

Office, Office of Inspection and Enforcement Ip, IS7O4.003 34X 
Fiche: 30-299, B3/iO/Oi, 82101S040S 



JaiO07O172 Forwards info re steam generator integrity & insps at ell 
operating P'HRs.per 790320 & 21 requests, Details of insps. 
Including defect indication*' tube plugging criteria & tubes 
plugged ui 1 1 not be provided eicept for Point Beach 1. 
CDLLER,H ft Division of Reactor Licensing (NRR-1973 onlgf 
7S/O3/24 HACCARV,R R Dlvitldn of Technical Review (NRfl-1975 
onlu) Spp 13443 196 24 x Fich* 50-000, 83/08/10, SS10070007. 



8210190411 Monthly operatltig repts for Sept ilB 
AUSTIN, Commonwialth Edison Co 62/10/06. 
24X Fiche. 30-298, 83/10/06,821 0150408. 



llpp. 19704:004, 



116 



DOCKETED ITEMS 



S ftepartablr occurrence*, LEHs & related corritpondtnc* 

8210070423 Secomminifi IE I i sue Into notice to Inform licsnsr* of 
possible indnu*t* surv* lllanc* far proper tuning o-f 
output capacitance far certain Inverters Recommendation 
caied on 910509 d 29 ml* output transformer shorts 
HELTEHEB, C J Director's Office S1/12/1C JORDAN, L Oiviiion 
of Resident & Rtalanal Reactor Inipcctlan 4pp. 15414 2S5 24X 
Fi che- 50-295, 81 /1 2/10. B21 00 70422 



DOCKET 30-305 KEWAUNEE NUCLEAR POHEfl PLANT 

F Security, medical. emergency It fira protection 



820917004! Forinardi draft vital area definition rept (or fmliU 
Dlv of Safeguardi ulll rcviiui technical bail* -for rpt 
during 980927-1001 lit* visit U/o end 

VAROA.3 A Opratlno Reactor* Branch 1 SH/OS/OB OlEStERit if 
Wiitoniin Public Service Corp Ip 14910 106 24* 
Flthi 50-305, 92/09/OB, B20917Q061 



8310010009 Respond* to FOIA request for 19 categories of docuirunt i re 
nuclear reactor events 4 safety pro bl inn Forwards, docuninbt 
llitcd in App A 

FELTON. J M Division of Rules and Records. 92/06/26 UDELL. fl A 
Critical Mm Energy Project 15pp S5727 (JOS 24X 
rich! SO-OOO.B2'/Ofa/2B-e210010008 

91 12210538 Forwards description -of events t resulting action r nigh 
circulating current auociated u/lnvirtir output dut to 
lact of circuit tuning IE circular or info notice ihauld bi 
lliuid to addMii lituv 

HELTEHES, C Dirsctor'i 0>ffici 81/12/10, JORDAN, E L 
Dlnctor't Office 4pp 19731 361 24X Fichu. 50-000, 82/06/23, 
B21001000B 



Ac k cooptration in planning Div at Safegujrdi BJOtJ?-] :: 
rgul*topy P fc tivtnin revinu Ttam will evaluate ovtrill 
f f { t(wn* t -of ncurltg program to dctirmin* It (aftguiTli 
ngulatiQnt Yield acoptable Uv*l of protiction 
EI6ENHUT.D Dtviiion of Lic.niing 83/O9/20 Ote6LEH,CU 
Wil co-Hi in Public Birvice Corp Spp 19672 O74 a^x 
Ficnt 30-309, B2/09/EO, 8310120305 



aS100B020t Forward i IE 5af*tg Evaluation Rcpt SO-309/02-IT Jur Lr | n 
I9S3 Mo no-ncomp 1 ine no tod 

H1N5. J A Divfiion at Emergtncij Pr*p*rtdni 11 Ic 0(irtlanil S It 
BS/Of/SS (JIESLER.C H Wl.coniin Public Siirvic. Corp 2 
ISA 40 090 24X Fiche 50-305, 02/09/22, BZ 100 BO 201 



-8203090&&9 Rupanili to rtquect to evaluate Ql 121 1 trip of two init 
auiiliary fnifuat*T punpi from lou iLtHon. Init-aMitlon of 
time rl*v on itartino cirtnitrj at motor driven -tuiilfarv 
fcadwatic pump-i will eltminjte probltm 

IUKDR-D Dirtctor'i Pfflci 82/02/24 MICHBLSON-C DLrtctor' 
Oitlcr 3ft 19730 339 S4X Fi che' 50-000, B2/O6A29, 92I0010QQ3 



8210030204 IE Safetg Evaluation Kept 50-305/82-17 during Auj K-Ei 
Nt nontompl i nt noted Major areas Inipec tad amer-gtntv 
ptn dtd Nov 19B1 

PAOL1ARO, J A i AKELSONr W L Division of Emergency Prrpl'flriMl 
Optration*! Sjppqrt 82/09/20 32pp 13640 Q<33 S4I 
Fichi BO-305, 92/09/22,0210090201 



8210050075 Suinnarg of 910513 opir^tlng reactor nvent) hitting 

LAINAB, C A*iitin.t Olric-tor for Bft(j An*iim*nt B1/05/1Q 
EIEEUHUT. D AitUUnt Diractcnr for Lie inting It ft 1572? 160 
24X Fichi, 50-304. 82/Ofc/aB, 8310010000 



G210130300 Faruardi CUvinon 3 to sscuritij force training I 
quftlEFication m*nu*l Revition withheld (ref 10CF02 7VDI 
OIEBLER.C M Mliconiin Public Servic* Corp B2/0?/il9 
Office of Muclear Reactor Regulition, Director 2pp 1S610 
24X! Flch> 50-30S,BS/0?/29, 8210130300 



9210040114, Foruirdi LER aa-02l/C3L-0 

CRAEBSEH.K L Commonuial th Ediian Go B2/Q9/S4 KFPPLER, J 
R.gjor 3, Off tea of Dtractor Ip 155BI 191 34* 
Flcn* 50-304,92/09/24,9210040114 



B210040IB1 LER 82-021/03L-0 on B80B27. dur in running t>f 2A turbin 
drivrn aurfliarij fatdwattT pump, flow obiervtiJ on pirnp 2 
dlicharg* htadir -Cauitd b"j Improper prectdure 
imp Itmnntit I on Prt>cdur* uill br revln-1 

JOHNSON, Cnramonunalth EJlion Co 82/0 9/24, Rtgton 3< 

of Director Ip 15591 192 24 X Flth* SQ-304, 
8210040116 



B3/07/30 KEPfLER, J 
Oi5 S4K 



ruardi LER 
CRriea3ER.K-L Cannonuaalth Ed i ion Co 
Region 3, Office of Director \f> 
Flcht 30-304, B2/09/30,Q210060aoa 



BEHD040267 LER eB-032/OX-0'9n SS0903, conti inrrunt ipraij dlan 1-drivin 
pump 2C filled to ttart during remo-ti ontrol ro-om itartup 
for mcJi*nl cal mint Cauitd by iGlcly undtripeed i witch In 
c lot id paiitlon due to impurltlii Sultcn *elf-cl>inr<] 
SHI Mi K Commonwealth Edtion Co 82/OT/30 Fltglan 3, Office of 

Director Ip 1S&3I Oi6 2*1! Flche SO- 304, 62/09/30, B2100oOZt3 

aai01B0167 Forward i LEB B2-OS3/03L--0, 

ORAES8ES.K L Conmonueanii Edion Co 82/10/07 KEPPLGR, J 
Rejion 3, Office o? Director Ip 137(8 1B2 24 X 
Fich* 50-301, 82/10/07, BB101SOI67 

6210180179 LEfi sa-023/03L-l> &n 920907,88 it*am gentrator level channel 
2L-549 dtd no-t tract Cauitd b v failure of transmitter 
(Flchr/Portr 1^DS49BKBBABBB-^S). TrinimCtter rplaed 
Invei t lgtlon ongoing 

CANTHELL.p E Commonui 1 th Edlion Co BS/IO/07 Region 3, 

Offle* of Dlractor Ip 15718 183 34X Fiefie: SO~304,B2/10/07, 
3201B01i7 



5210050103 Forwards IE Safeguard* Inp Ftept 30-303/02- If, or* flJIEJ 
i notice of violation Notice of violation withheld 
(ref 10CFH73 211 

KILLER. J R Diviiion of Engineering t, Technical Ftcyrifi tJ 
OTESLER.C W Witeonsin Public Service Corp Spp iSiOJ HJ 
Fiche 50-303.82/09/30,6210050102 



8210050110 IE Safeguards Insp Rapt 50-305/Ba-li on QSQO'a if 
Haneomp lianca noted failure to certifg qua lit leal lent tt< 
itcurltv force number*. Dt*i 1 1 uiithhild (reP IQCFR73 Ell 
flELANOEfl-J. L . CREED. J R Region 3. Office of Dirtctor 6J 
Ip. 156O3 297 24X Fichv 30-305, B3/09/30, D2100SOIOJ 

B210I305S1 Provides info ro change! to facillti/ flr p.to^ltlU^ 
conmitmtnti flvlid mod schedule submitted in At tach-nint I 
of utll 820S04 Itr should be considered ma* t current li 
accurate schedule 

OIEBLEfl,C M Wlsconiln Public Service Corp 83/10/00 
Off lc* of Nuclear Reactor Regulation, Director 2p? ISfrTfl 
24X Flcha 30-305, 92/10/06, S2101305S1 



8S 1023042 3 Forward! one-time fiemption from 10CFH90 App f-rnu 
energvicij prepartdnesi exercise be conducted annually 
EIBENHUT, DO Diviiion of Licensing 8S/10/15 OlEBlEfl.l 
Mlicontln Public Etrvice Corp 2pp ISBhO OH ?4( 
Flefte' SO-30S, 02/10/1S, 0210280423 



32103604,23 One-tlffli exemption from 10CFR30 App , riquU InM* 1 " 
tnnrjentv prvparednest eierclse Neit tiercit* tchttwllf 
for B31101 

EJSENHUT, D O Division of Licensing 82/10/13 WIIIBMJ 

Public Service Corp 3pp 19860 014, 24X Flcht >0-301i >' 
8210290433 



P Operating licenss stage documents & correipondnc 



6310240219 Forward* LER aa-024/01T-0 

SRAESSEfir tt, L Camnonueal th Erfison Co 02/10/17. 
R.afon 3, Offlt. of DirttUf, Ip 15804:262, ZAt 
Fiche. SO-304, 62/10/19,8210240219 



8210010)7? Application to amsnd Licensi DPR-4C3j rtvltinj Tick S 
raDTg*ntiaton of nuclear dept 

OIESLER.C. H Hlsconiln Public Service Corp 82/09/27 ^K 
Nuclear Reactor Rsgulatton, Director 2pp ISSfi? Sfl7 1't 
Fiche. 50-303. B2/09/27, S210010I79. 



~9Si026023 LER B2-024/01T-0 an 650926, u,h!U taking RGB io!ld. dilution 
occurred via incorrect nUup luhen cpnt*lntnt Intigrltu wat 
not intact w/ihutdoun rglr> Caused bu ptrsonnel trror 
Opr*tor ralnttructeil 
T'NIENI.H . CoiMierivaaltlv Ed I ion Co, 82/10/11'. Region 3, 

**- 2+X Fich, 50-304,02/10/19, 



-S21OOIOISA Proposed Tech Specs reflecting org anil* than t JJl' 
torporat* nuclear engineering staf t , elarl * iflny trt^liHl *' 
meeting! & line of authority for nuclear safety r*v(ii 
ay if it committee It i homing functional r*ipon*lblll tltl 
* Miiconiln PUBllc Strvlc* Corp, 82/09/S7 13pp li' 
24X Ficht: 30-308, 92/09/27,6210010179 



DOCKETED ITEMS 



117 



6310060312 Advise* that analyses of plant-specific safety & relief 
diva Discharge piping per NUREO-O737. Hem II D 1 require 
jror* tine than proposed In 82O712 Itr Item resolution uill 
be identified fc implementation schedule provided b<j 831113 
CIESLER, C U Wisconsin Public Service Corp 82/09/27 
EISEMHUT.D Division of Licensing Ip 1S619 169 24X 
Firh 50-303,02/09/27,8210060312 

B21OI 30600 Informs that review of 810831 %, 0915 responses to Oeneric 
Letter 81-01. "Qualifications for Insp. Exam & Testing tt 
Audit Personnel," completed Commitments t eiceptions to 
Fe/inon I to Reg Ouides 1 56 it 1 146 acceptable 

VARQA.5 A Operating Reactors Branch 1 82/09/28 OIESLER, C U 
HicoTi*in Public Service Corp 2pp 15692 345 24X 
Ficho 50-3O5. B2'09/2B,821013060O 

S3IIJ21O395 Forwards safety evaluation of Generic Issue B-24, 
"Containment Purging During Normal PI ant Op eration " 
t.TJREC-0737, Item II E 4 2 mill be completed by purge & vent 
revieu Technical evaluation encl 

VAROA, S A Operating Reactors Qranch 1 82/09/30 CIESLER, C U 
HLiccnun Public Service Corp 9pp 15772 314 24X 
Fiche 30-303,82/09/30,6210210395 

62-1O2I04Q3 Safety evaluation of containment purging t" venting during 

normal operation Request for addl info re QA program encl 

* HRC - No Detailed Affiliation Given B2/09/3O 4pp 
15772 323 24X Fiche 30-305. 62/09/30, S21 OS10395 

8-310210410 Safety evaluation of facility override of containment 

purge isolation Licensee should demonstrate that override 
condition automatically removed upon clearing initial signal 
or provide sgs level annunciation 

* NRC - No Detailed Affiliation Given 83/09/30 2pp 
15772 337 24X Fiche 50-305,02/09/30,0310210375 

B01OO7O330 "Technical Evaluation of Electri cal , Instrumentation it 

Control Design Aspects of Override of Containment Purge 

Valve Isolation tt Other Engineered Safety Features for 

Heuaunee Nuclear Pouer Plant " 

HACKETT. D B EOt.0, Inc EQO-1 1S3-4160 80/09/30 NRC - No 

Detailed Affiliation Given 23pp 15772 329 24X 

Fichi 50-305,63/09/30,8210210395 



Comments on t-IRC proposed generic requirements for steam 
generators Opposes requtrementsi favor ing mg t control program 
currently in effect Program should be at volition of utll 
mg I t, notice requirements 

QIESLER.C H Miscons in Pub 1 ic Service Corp 62/10/04 
IPPQLITO, T A Operating Reactors Assessment Branch 4pp 
156SB 070 24X Fiche 50-3O5. 03/10/04, B2I007010B 

aaiOJ9O40? Forwards progress update an implementing NUREO-0737. Items 
II B 3, II B 4, II F 1 3. IIF16&1IID34 
arESLER.C W Wisconsin Public Service Corp 82/10/14 
ISEN4)ur, D G Division of Licensing 4pp 15733 331 24X 
Fi che- 50-309, 03/10/14, 6210190489 



is-pection reports, IE Bulletins b correspondence 



B21O070Q07 Responds tn FOIA request for eight categories of records re 
steam generators Ic steam turbines App A documents provided 
in R Udell FOIA Request H1-3I3 Forwards documents listed in 
App B 

FELTON, J H Division of Rules anS Records 82/OS/1Q LQN8, D J 
Wlnthrop, Stlmsan, Putnam h Roberts 9pp 15645 063 24 X 
Fiche 50-000,62/08/10,6210070007 



B2100SO204 IE Btfaty Evaluation Rept 30-305/B2-17 ifuriliB AUB l^BH 
No noncompl Ijnce noted Major Tea* impacted emergence/ 
plan dtd Nov 1981. 

PAGLIARD.J A - AXELSON, U L Division o* Emrfl*ncu Prpardns fc 
Operation*! Support 02/09/20 32 (>p 1 364O- OfS 24X 
FlchB =0-305.83/09/32.8210030201 

8310060328 Farutrifi util B20917 riflan*t to MHC B2O71S quaitloni r> IE 
Bulltln BO-04. indvertentl() sent fco Region 3 

OIESLER, C W Wisconsin Public BaTvite Corp BZ/Qt/21 VAROA, a A 
Operating Ructor* Branch 1 Ip 13619:028 SIX 
Flcha, 50-309, BZ/09/29, B21O06O3ZB 

8210050102 Foruards IE Bafaguardm lnp Rept 5O~303/B2~t6 on B20BE3-37 
t, notice of viol*tin Notice of violation withheld 
Iref 10CFH?a 31) 

MILLER, JR. Division of EngineBrino < Taehnical Program! B2/09/3O, 
OIESLER.C.W Wisconsin Public Sirvlca Corp Bpp 1 S603 B9S 24X 
Fich* BO-303, ea/O9/30, BBlOOOOloa. 

6210050110 IE Bafi-ouardi Intp Rept 90-303/32-16 on 920833-27 

Noncomplijnca noted failure to certify qual if Isatlons- for 
security force members Details withheld <rf IOCFR73 21J 
BELANOEH.J L. i CREED. J R fieolon 3i Office of Director 33/01/33 
Ip 15603 297 S4X Flcha 30-305,82/09/30,0310030102 

8210060174 Forujirds conf irmatorii mm a sure men ts program data addendum 
sheet for IE Insp Rept 30-305/02 QB h c toting out Open Item 
50-305/B2-OB-01- 

PAPERIELLO. C J. Division of Em erg one g Preparedne-si & Op>ratlot>al 
Support 8S/10/05 OIEBLEfi, C M. WJiconsin Public Service Carp 
Ip IS640 157 24X Fiche 50-3O5, B3/ 10/OS, 8310080-174 

621O080177 Addendum to IE Inp Rept 50-305/92-08 coniting of 

confirmatory meacuretiKn ti program data iheeb re 6r-B9 {< 

Sr-90 samples Sample* balcw coirpariion llmlti 

* Region 3, Office of Director B2/10/O3 Ip. 19640 158 24 X 

Fiche 50-305, 02/10/034 821003017* 

8208190533 IE Info Notice BO-3S, Sup pi 1, "Latino *< Dltladfled I-1S3 
Implant Seeds " Svc list encl 

CODE, L I Division of Fual Facilities. Material! It Safeguards 
B2/1O/O6 Consolidated Ediion CD of Nu Vorl 66pp. 157il 3BO 

24X Fiche 50-000, 82/JO/06, 8303190233. 

8210190532 Confirms i-chedule for 02101B enforcarnent conferenco at 
Region 3 ofcs to tflscuis potential escalated enforcement 
action! r> rtcent Identification of capped containment 
preiiure tensing lines 

KEPPLER.J Region 3. Office of OirDctor 92/1O/I3 MATHEWSi E. U 
Wlit on* in Public Service Corp Ip 157S1 2S4 24X 

Ficht so-309. ea/io/i3,siaioi9os3ia 

82102BOB23 FDTUJjTdt 1 Insp FUpt SO-305/B2-13 on B2O701-OB31 & noblcoa 
of violation b deviation 

STREETER, J F Division of Project & Reildent Programs 83/10/13 
OIE8LER.C U Mltconsin Public. Birvice Corp 2pp. ISQSt 279 24 X 
Flcfce 30-303, 82/10/13,0310300223 

--63102B022& Notice of violation from imp on Q20701-OB31 

STREETER. J F Division of Project b Revldent Program*. B2/10/13 
Ij. 19B39 961. 24X Fiche, 30-303,02/10/13, 8210230823 

82102B0229 Notice of deviation from Intp on 320701-0631. 

STREETERf J, F. Division of Project t Red*nt Program! B2/10/13 
Ip 19B37 262 24X Fi eh * 30-303, 32/ 10/13, 8310360223. 



0310070139 Forwards tabulated data on steam generator Insp t maint at 
facilities Data should be provided to licensees 
(PPOLITO, T Operating Reactors Assessment Branch 82/04/01 
VAROA, S Operating Reactors Branch 1 5pp 15645,131 24X 
Flche 50-000,82/08/10,8210070007 



-- 82102B0232 IE Imp Rept 90-303/82-13 on 620701-0831 Moniompli anca 
noted failure to maintain control of comb uitib 1 e matli ti to 
isiue operatlam ma mo ac at B20B2O 

NLSDM,R.L , REYES, L- A, Division af Project & Roildent Program* 
62/10/Ofi 10pp. 15B37.283 24 X Flchi ' 80-305, 03/10/13, 821 OBBOB23 



S21O070I72 Forwards info re steam generator integrity d ineps at all 
operating PURs.per 7S03EO b 21 requests Details of imp*. 
in-eluding defect indications, tune plugging criteria St tubes 
plugged mil not be provided eicept for Point Deach 1 
OOLLER.K R Division Df Reactor Licensing (NRR-1975 onlv> 
75/03/24 HACCARY.RR Division of Technical Revieu (NRR-J97S 
onlif) 5pp 15645 196 24X Fiche 30-000, 62/Ofl/lO, 8210O70O07 

GSfOQBOSOL Foruards IE Safitu Evaluation Rept 50-305/82-17 during Aug 
[?B2 No noncomp 1 lance noted 

HIHO.J A Division of Emergency Preparednes* ti Opsrattonal Support 
BS!/0?/22 eiE3LER,C W Misconsin Public Service Corp 2pp 
15640 090. 24J< Ficha 50-303,82/09/22,8210080201 



8208190238 IE Bulletin 82-03, "Btrvif. Corroiion Cracfcing in ThUk- 
Uall,Large-DlantBteT,Stalnlesi 9 tvel, Dec Ircu latlon 8u 
Piping at BUR Plants " Svt Hit gncl 

DEYOUNO.R C Director's Office, Office of Inpectlon and 
Enforcement, 82/1O/14 Consolidated Edison Co of Nu Vorfc 

119pp 15810' I2S. 24X Fiche' 30-000, 82/1O/ 14> 820819023B, 

92108&01&1 Confirm* schedule far B21O22 tifor cgment cunfarenca u/util 
to Jlitut* potent!*! escalated enforcement action r* recent 
identification of capped containment prenur-e tiniing lines. 
SPE3SARD. R L Division of Project ti Resident Progrimi 02/10/15 
MATHEW3, E, R. WUconsln Public Service Carp. Ip 1379 1 ? 007. S4K 
Flche. 90-309.82/10/13,8210260161 



118 



DOCKETED ITEMS 



B Riporfrable occurrences LEFi tt related eorreponiJ>nc 

B2I01201B2 Dlicuiie* finding* T numeroui failure* of containment 
flotation valve* All FalluTii reiulte-J fron Inopiraltte ASCO 
Serin B3EO olenold vilv. uiiralla dui to nil In air 
lupplv Valve* undergoing qualification 

LANNIW9.M Director'* Office 00/06/2? Dinctor'i Office 

2pp 13492 216 24X Fiche 3Q-29S, SQ/08/J2, S210I21HB2 

0210040136 FoTuardi LEft 92-036/03L-0 & updated B1-Q-36/03X-I 

QIEBLCR.C M Wlieoniln Public Service Corp B2/&7/24 KEPPLEH, J 

Reoion 3, Office of Director IP 15582 317 24X 
FIcfie 50-309, 82/09/34, B21Q040156 

8210040159 LER B2-02a/Q3L-0 or. 920625, damper on Train A failed open 
c-auilng loni iBiclal ventilation fin to i.tart automatically 
Cjuird &v bad coll an lalenoid controlling exhauit Miter 
inltt daropir Cell replaced 

BEflKHOFT.B L HI icon* In Public Servici Corp &2/09/S4 Region 

3, Of fit* of Director lp 15302 316 24X Fiche 50-303, B2/09/B4, 
B21004015i 

B21C-04QIi2 Updated LER 81-036/03X-E' an 61 1 1 03,motor drive auiiliaru 
fenJuater lube oil pump continued to run uhen pump IA 
itoppad Cauied ky exce-lv u*ar d mliili gnnint o-P lultch 
llntagt mtchiniim Warn p*rti rplac*d 

B-LANT,J L, Htacanitn Public Bsrvict Corp 62/09/21 Rigian 3, 

Office of Dlnctor 2pp 155BE 31? SIX Flcht 90-309. BS/09/S4, 
B2 10040 ISA 



9210040354 IE Imp Htpti 50-282/92-13 i SD-30i/02~l5 on BK3JI H 
noncomp lian ct notsd Major *rt*i infp*ct*<( prviaui 
ifif icivnci 1 1 in prompt notlf ication/uarnlng njt 
PATTEfiSON, J P Dlvition of Emargeney PTB par.dnm I l)i, T , 1 1 -.. 
Support 62^0^/09 4pp 15593 358 24 X Fit!,* SO-Mlll.D^C?' 
B210040345 * u ' 



B2100B01S4 Forward! rvid Pagt 4 reflecting NRC gutdlntt (n 
activation of puollc *lrt tc notification iv**r* OJ10I* 
mirgtncu p]an utrcilt 

WARD.E C Northtrn Stati Pouier Co 03/07/30 AKFIiiUN u L tt 
3. Office of Director 2pp 13640 1 7S 24X richu SO ,'tfj GJ/;I V 
8E100B0.1S4 



621012050? Notification oF 921001 meting ui/1 1 c initl. DNL k frihnr'. 
Planning ( Hg t. Jnc In Btth.id*,HD to ditcitii rsquiili far 
tiinptlon from lOCFRSO.App fi riqulremcnt* re flrt 
protic 1 1 on 

DIIANNI.D C Qptratlng Ftiaeton Branch 3 Ha/O^/Jf) f(W>' t * 
Operating Raacton Brinch 3 2pp 13672 346 34X 
Fiche 90-292,03/09/23,821012058'? 



B210260374 Ac* reenipt of FEMA S20526 1 tr re tvalu.Hpti of a'tLti 
imergencv priparedniti for facility Bierciiv ti 4ti<icn|i-4 
final tierciie evaluation! Offiite imerginc ij prtc*nifni n 
defleitnctei ihould b> addr*ntd b</ utll 

HIND.J A. Division of Emtrgency Preparedni 1 Uprrtt luntL fl ti 
82/10/21 OILBERTBrD E Nor t turn State* Power Co Jit \ir * 
24X Fiche- 50-BB2, 82/10/81, 0210260374 



92101^0333 Formrdl LEfts 92-OB9/01X-1 & B2-C-3t/03L-0 
OIEfiLER.C U Miiconln Public a*rvlc* Corp 82/10/11 

Ftigion 3. Offlei of Dlrtctar. lp 1S742 E07 24X 
Fiehf 3Q-305i B2/10/U. B2101W353 



HEPPLEH.J 



-8EJfll?03SS LER B2-Oa?/01X-l flTl BZ0927. d I icovirad that monthly tafltinfl 
rtqulrsmtnti iioad'ad far tcntilrifnirt ri<fttioTi nanitort 
R-ll tt fi-12 Cuid by pottpontmtnt of tsi-t dui to backup 
radiation monitor bting out of ivc & ptrtannil ovtrilght 
4 Miieaniln Public Strvici Corp B2/10/1I Atglati 3. OPFlci of 

Olrtctor. 2pp 1S742 I OB 24XFichi 50-305,82/10/11,6210190393 

-82 1 01 9035i LER 92-03 1/03L-0 on 320913, trl in ID of ihlvld bldg vint 
filled to tailtch to E-vcirculitlan ifOdt *Ftir draulng v-icuun 
Rtc ircu lotion d*rnprr filid to apin dui ta brottn hydraulic 
punp on il ctro-JnjdrL)Uc dinptr actuator, Dptritor rtpljod 
uEHNHOFT.8 L Hliconln Public SirvUt Carp. SS/10/I3 H>oion 

3, OPfic* of DiTtctor. lp 15742 110 24 K Fich* SO-305, B3/IQ/1 1, 
8210190393 



8210240260 Foruarrfi LER 82-030/O1 T-0 

QIE&LER, C.tf Hiiconiln Public Strvlci Corp 02/10/10 

Rigion 3- Qfflci of Director lp I37f9 349 24X 
Fiehi 30-305, 



KEPPLER, J D 



8210270Bi? Foruard* info clarifying 820630 ript, "I In Pial 
Shutdown Analgtli in Compllanct W/10CFRSO, App R.Ontion 
III O It Sjbitantive Ba*ii for Eiemptlan Rnuiti. " ptr 
821001 jnteting u/NHC 

HUSDLF.D- Northern States Powtr Co 63/10/2a llfflu 

Reactor Regulation, Director 132pp I9B2? 0-1 V 3*1 
Fiche SO-2B2, 63/10/22,8210270262 



P Operating lie en-it itage documnt tt correi pondgnct 



S21O0401B3 Submit* lupplenintal info re util OaOi M muni 
to- Llcenin DPR-42 d DPR-iO "LOCA ECCS Limiting Jlritt t 
EtpoiuTt Seniitivitij Analgiii for ENC XN-1 tt Xrl-lt Wtlotli 
Prairie Island I " applln to both Unit* 1 8. U 
rlUSOLFjJ) Northern State* Power Co B2/09/24 Offld 

Reactor Rrgulatlon, Director lp 15901' 2O3 U4|f 
Fiche 90-282- 02/09/24. B210040123 



B21OOS0319 Forward* reiponia to Core Performanca OrtniK ^.'"U 
T* methodi of monitoring core pouir dlitribu t ioni tar 
C<;c le 7 opera tier 

MUaOLF.D Northern atatti Power Co 02/07/HV (\ltni 

Fttactor Aaoulattom Director 13pp 19610 260 J4I 
Flcha 30-262, 92/09/2?, 0210050319 



6210340263 LER B2-O30/OIT-0 an 821004. itniing HUM on all 1 1 
contalnminfe pr*itur traninltttr* found capped off Intl4e> 
rtnderlng traninl tteri inaptrable, Cautid by nFvtling capi 
Inadverttnt lu pUcidi on end* of tenting 1 inei Capi removed. 
MARCHI.tf L Mliconin Public Service Corp 03/1O/1S Rag ton 3. 

Office of Director lp 1579? 349. 24* Flene 30-303-B3/10/1B. 
&2 10340240 



Q210l302iO Dlicunet Implementation of NRC guldatlnii In' un 
hourii provided In Oaneric Ltr 82-12 Revlted guldelinn ij.r 
been Implemen tadiu/nctpt ioni of 72-h per ul IlmlUUo- t 
relief from control board dutlei 

rlUSOLF.D Northern 8t*tei Power Co 02/10/07 (|fm >' 

Reactor Aegulationi Director, Spp, 1S676 018 a + < 
Fiche: 30-000- 0B/10/07.B210130260 



V Operator 



8210050263 Dticribt! Implvnantatl on of unior reactor operat-or upgrade 
training to- complg w/WJHEO-07a7i I tem l.AS 1, "Senior 
Reactor Operator Qua I i'lcatloni " All potential candidate* 
cannot be examinid until Hag/Ju-ne of 1983 

OIE9LER.C M Hlitoniin Public Service Carp, 02/09/29. DENTtWJ, H R 
Office of Nuclear Reactor Regulation. Director 3po 
24X Ftche' SO-305, 82/09/39, 02IOOW263 



S210BiOl54 Advliei that modi required bu MJRE 0-0737, Hit Ml C 1 > 
"Co-ntrol Room HBbltabUity< " ul 1 1 not be completed ur.nl 
B30313 dut to delay* in receipt of matl d lainplln) 
equipment. 

HUBOLF. D Northern State* Power Co 82/10/22 Ufltli t' *. 

Reactor Regulation. Director 3pp, 10799 012 S + 
Fich:SO-2B2, 02/10/22,8210260134 



Inspection report*, IE Bulletin* & eorrep andanc* 



B210070007 Reipondt to FOIA requett for eight CAtiforUi <l ">* 
iteam generator* 4 iteam turbine* App A documenti (ro^iril 
in R Udell FOIA Requeit Sl-313 Foruiardi docirmentl llHtf )< 
Aff B 

PEL. TON, 0. N Dlvition of Rule* and Record*. 02/00/10 1C* S 
MInthrop. Stimton. Putnan IcRoliertt 9pj>, 19649 0*1 3'T 
Flche 30-OOOj 92/09/10,0210070007 



BS10070139 FTiard* tabulated dat* on ct**m gn*r<Lr 1*11 I * 
fad 1 1 tie*. Data ihould be provided to liceni*l 
IPPDLITO-T. Operating Reactor* Atieitmint Branch ttW 3 
VAROAiS Operating Reactor* Branch 1 9pp I5a41 111 !* 
Ftche. 50-000, B2/OB/10, B210070007. 



DOCKETED ITEMS 



119 



S21Q07O172 Forwards info re steam generator integrity & inpi at all 
oplratlng PURi.per 790320 b 21 requests Details of Inspl. 
including defect indications, tub* plugging criteria & tub** 
plugged uill not be provided except for Point Beach 1. 
OOLLER. K R Division of Rtactor Licensing (NRR-1973 onlg) 
73/03/24 MACCARY. R R. Division of Technical Review (NRR-197S 
only) 5pp ISMS 196 24X Fiehe 50-000, 88/08/10, 8210070007 

9210040045 Forwards IE Imp Repts 50-382/62-15 fc 30-306/82-13 on 
Baoaa4-29- No noncompliance noted 

PAPRIELLO,C J Civilian of Emergencg PrBparedness b Operational 
Support 83/09/10 LAR60N.C E Northern States Power Co 2pp 
1339-3 35& B4X Fleha 90-502. 82/09/10, 8210040343, 



S Reportable occurrences. LERi t, related correspondence 

6310190726 Forward! LEfi S2-017/03L-0 

KUSOLF.D Northern States Power Co 82/10/00 Region 3. Office 

of Director Ip 13737- 144 24X Fiche 50-306,82/10/03,8210190726 

--02IO190749 LER B2-017/O3L-O on BB0900, tuo undervolUge relagi found 
to trip outside tolarancn band of 90 plus or minifi 2X a f 
nominal voltage Causa not stated Relagt reealinr 
HUN9TAD,A A Narthsrn States Pouier Co 82/10/03 Region 3, 

Office at Director Ip 15737 145 S4X Fiche 50-306,82/10/00, 
B21OI9O726 



32I004O354 IE Insp Repts 50-2B3/B2-15 l> 50-306/03-13 on 820B24-25 No 
TicncompUance noted Major areas inspected previous 
dFicienc ie in prompt notification/warning igi 

PATTERSON.J P , AXEL8QN.U L Division of Emergency Preparedness !. 
Operational Support 82/09/09. 4pp 15993 338 24X 
iFiche 50-2B2,B2/09/10,8210040345 

B2]0130,5o3 Forwards "Inservice Insp-Exam Summarg. Prairie Island Nuclear 
Generating Plant-Unit 11,820601-0709 " 

HUSOLF, D Northern Stata, Power Co 82/10/03 Office of Nuclear 

Keaetor Regulation. Director Ip 1S6B3 118 24X 
Fieh- 30-306, 82/10/05,8210130363 

&210I30566 Inservlce Insp rept on 820601-0709 Rept summarizes eiam 
remltc of balance-of-plant tt eddg current exam of steam 
generator tubing 

ANHERSON.J1 T , SCMANEN, J F , DAHLMAN, L C Northern States Power 
Co. B2/09/I8 100pp 19683119 24K Fiche 50-306, 82/10/09. 
8810130563 

B2GB19O233 IE Info Notice BO-33. Buppl 1, "Leaking It Dislodged 1-129 
Implant Seeds Svc list enel 

COBD.L I Division of Fuel Facilities, Material* b Safeguard! 
e2/lO/06 Consolidated Edison Co of New Yoi-k 66pp 19761 350 

34X Flchm 30-000,82/10/06, 620B190233 

B21OI90432 A< t receipt of B20915 Itr informing NBC of steps tak an to 
corTict violations notad In IE Insp Repts 30-202/82-11 & 
SQ-30A/B2-1 1 

SPESSARD, R L Division of Project S, Resident Programs B2/1O/07 
LARSON, C E Northern States Power Co Ip, 18741 182 24X 
Fiehe) 30-202,82/10/07.8310190433 

B21O17D439 Responds to NRC 820317 Itr re violations noted In IE Insp 
Rpte, SO-2B2/B2-11 fc 30-306/82-11 Corrective actions 
startup program changed to normaliie flu* difference 
channels 

LAR8QN,C E Northern States Power Co 82/09/13 BTREETER , J F 
Division of Project li Resident Programs 2pp 15741 IBS S4X 
FlehB 30-282,82/10/07,8210190432 

62 HM 50249 Aei receipt of 820928 Itr informing NRC of steps taken to 
correct violations noted In IE Insp Repts 30-2B2/B2-I3 & 
30-306/B2-13 

BTREETER.J F Division of Projact & Resident Programs 02/10/08 
LARSON. C. E Northern States Power Co, Ip 1B704 361. 24X 
FicJit aO-2S2>82/10/00,B210190249 

S210150295 Responds to NRC SB0902 1 tr re violations noted In IE Insp 
Hapt* 30-282/82-13 b 30-306/B2-13 Corrective actions- dlesel 
generator test procedures will ba revised bg 821201 & 
Invai t ijative rept uill be discussed u/operators 
LAFtBON'C E Northern States Power Co 82/09/28 BTREGTER-J F 
Division of Project 8. Rasidant Programs 2pp 13704,342 34X 
Flche. 90-3B3, 82/10/08. 02101 30249 

S21OS801A4. FoTW*rds IE Insp Repts 30-282/82-16 I, 30-306/B2-16 on 
02O9O1-17 & notice of violation 

STREETER, J, F Division of Project i Resident Programs 83/10/13 
LARSON- C. E, Northern States Power Co 2pp 19837 199. 24X 
Fichi. SO-282, 52/10/13.8210280164 



DOCKET 50-309 MAINE YANKEE ATOMIC POWER PLANT 

F Security, madical> emergency & fire protection plani 

6210070094 Forwards Amend 64 to Llcenie DPR-36 & notice of issuance & 
availability Arnand requires meint of safeguards contlngencg 
fc guard training b qualification plan 

NEITHER, K L Operating Reactors Branch 3 93/09/1S OARHITY.J H 
Maine Yankee Atonic Pouiar Co 4pp 19646 3S1 24X 
Fiche 30-309,82/09/15,8210070054 

621O0700S9 Amand i4 to Liceni* DPR-36, includ ing requirement to maintain 
Commission approved guard training & qualification plan 
CLARK, R A Operating Faactors Branch 3 82/09/15 2pp 
358 24 X Fiche: 30-309,82/09/13,0210070034 



8210O700AO Notice of issuance t, aval lab 11 itg of Amend 64 to License 
DPR-36 

CLARK. R A OjKratino Jfeactors Branch 3 82/09/15 3pp 
15&46 357 24 X Fich 90-307,82/09/19.8210070094 

Q21005O013 Rle*( public venlon of vol II of amBrgencg plan 

FELTON, J H. Division of Rules and Records 83/09/16 Document 

Management Branch Ip 1S622 321 24XFiche 30-309, B2/O9/1A, 
9310050013. 

8210050015 Forward* public version of Vol II of emergency pl*n Receipt 
form encl 

* Maine Yanfcee Atomic Paiuer Co 02/OQ/30 EISENHUT,D NRC - 
No Detailed Affiliation Given, 2pp 15622222 24X 
Ficne 30-309. e2/09/16i B210030Q13 



B21O05001B Public veraion of Uol II of emergencg plan 
Maine Vankee Atomic Power Co 02/07/12 211pp 
34X Flche 30-309- 82/09/16,0310050013 



15622 S?4 



6210210136 Forujrda IE Imp Rpt 30-309/82-12 on B20726-30 No 
noncomp liance noted 

ALLANrJ M Rvglon 1, Office of Director 02/10/Ot RANDAZZA, J Q 
MilTl* Yin 1*1 Atomic Pouer Co Bpp 15766 107, 24X 
FUh*. 30-309, B2/lO/06iB21O210136 

--B21O210142 IE Insp Rapt 50-309/02-12 on 020726-30 No none ompllanc o 
no>t*d Major araa inipected follouiip of emergency 
pT*par*ndess ibens from B1090B-15 appraisal 

14OJNA8. E- J . CROCKER, H H Division of EmergenEg Preparedness t 
Operational Support. 82/09/30, llpp. 13744 109 S4X 
Fiche SO-307,aa/10/06, 82102I013o 



8210210313 Foruar*! IE Safeguards Insp Rept 90-309/08-11 on 020719-21 
1 notice of violation 

MARTIN. T T Division of Engineering tc Technical Programs B2/IO/07 
RANDAZZA, J B Maine Vanfcae Atomic Pouier Co 2pp 19764'227 24X 
FieNt: 30-309, B2/1O/07, B210S10313 

--82102103U NotlcB of violation from insp on 820719-21 

* Division of Enginstrlng d Technical Programi 82/10/07 Ip 
1S744 229 24X Fiche: 50-309, 82/10/07,8210210313 



3210280171 IE Insp Repis 90-282/82-16 fc 90-30i/B2-16 or S20901-17, 
Nonconpllance noted 1 failure to post no smoking sign in 
fBty-rl*Ud equipment area* Ic operators found smoking. 
DUBRV, N E, , REYEB.L Division of Project & Resident Program* 
82/10/12. 6pp. 1BB37-202 24X Fi ch*. 30-282, B2/10/13, 821O2B0164 

S20B190MS IE Bulletin B2-03, "Stress Corroaion Cracking in Thiek- 
HllrLarg-Dlmeter,atalnles* Steel, Reclrculation 8ys 
Piping at BUR Plants. ", Bvc list encl 

DEYQUNOi R C Director's Office. Office of Inspection and 
Enforcement 82/10/14 Consolidated Edison Co. of Neu York 

115pp. ISS10.12S, 24X Ficht'SO-000,83/10/t4.820019033B. 



8210210321 IE Safeguards Insp Rapt 3Q-3Q9/B2-11 on 820719-21. 
Noncomp Kane* noted failure to establish SNM control t, 
accounting procedures to assure that sources b datectors 
rctlvd, controlled, Inventoried t (hipped properlg, 
KUBHNERjlJ L,, CODY. A, T. Division of Engineering t Technical 
Frogratns 82/07/14 7pp. 13764.230. 24X Flche- 30-309- B2/10/07, 
9210210313 

B21013017B Ack r*olpt of B20527 Itr informing NRC of steps taken to 
correct violations not erf in IE Safeguards Insp Rept 
30-309/81-02 Corrective actions withheld (ref 10CFR73 21). 
MARTIN. T, T Blvlsion of Engineering fc Technical Programs 02/10/00 
RANDAZZA, J.B. Maine Van* ee Atomic Pouiar Co 2pp. I3673'020 24X 
FIeh. 30-309, S2X1O/08, BaJOl30l7B. 



120 



DOCKETED ITEMS 



S3l02t30QB7 Advuei of recent changes to B30601 scuntu p ian, me luding 
moving portion of perimeter security fence !< observa-i i on 
toner to provide ad-fl area within protected area Changes do 
not decrease ef f ec t 1 venei s of p!an 

GABRITV.J H Maine Vanlne Atomic Pow.r Co 62/1O/21 DENTON, H R 
Office uf Nuclear Reactor fltju ] aUon. Director Ip 1 SG37 134 24 X 
Flche 50-307, G2/10/.21,B2103BO<}B7 



hi General corr*i|>Dndnc* 



ip-ondenc e 



a21005023i Re&ponse opposing NFIC te util objection* to Soluble HE Pouer- 
830930 addl specific contentions NRC b util itds sought to 
be imposed are unfairly t improperly restrictive of 
intervetior right to be fisard 

MltLEft-D S Senible Maine Pouer MILLER. D S Miller, D S 
62/09/30 Atomic Safety ant Licensing Board Panel 13pp 

L56GB 34? 24)! Ficf-e 50-309.83X09/30,6210050336 

E21Q0601TO RespoiM* opposing NHC & util 820915 repliei to State of HE 
620330 addl con t*n t ions All contenti DTII should tie admitted 
Certificate of Svc encl 

AHflEHS.p Hair.*, State of B2/Q9/3Q Atmnic Safety. and Licensing! 

EaariJ Panel 34pp 15613 340 24X FLche 50-309, B2/09/30. 
8210040190 



ruamf 1QCFH2 Su&parl D per B2090i request 
GUTIERREZ, J H Hearing Branch 3 &2/IO/01 MILLER, D B 
Miller, D S 9pp E5643 O30 24K Flche SO-3Q9, 82/ 10/01, G2100BQOi<7 

G210I30314 Answer opposing Sensible ME 1 Pouer 830924 motion for 
clarification fc m&iJ of ASLD 620113 order on sdmisiibtHty 
D* contontioni Filing i) untimely & forbidden by 
regulations Certificate of Svc end 

DIONAN, r , GAD,H K Haine Vanlcte Atomic Pouier Co DIOWAH, T 
Ropm ** Oraij 92/10/09 Atonic SaPstij and Licensing Board Panel 

4pp lSt70 151 24X Fiche 50-309,92/10/09,8310130314 

53)0150134 FDruardt ABLE 820715 partial InUlil decision in Gig Hocl 
Point spent furl fool amend proceeding Eamo procedure^ r* 
EIS ill ou Id be uied in instant caie 

GUTlERflEZ.J M We4rino Branch 3 32/10/13 LAID, R H . HAND.C H , 
HQF1R1S.P A Atomic Safety and Licensing Hoard Panel 2pj> 
15697 3fl6 24X Flche 50-309,82/10/13,3210150134 

aaiOS0006& Ftepl^ opposing NRC !, applicant opposition to Sentibl* ME 
Pouer motion for util disclosure nation ihould not b p 
charac ternatf as premature discovery Info requested oaiic t, 
esiential to orocveding Certificate of Svc encl 
HILLEfl.D S Sensible Ka i ne Pousr MILLER, D S Mi 1 1 er, D 3 
02/10/13 Atomic Safety and Licensing Board Panel Spp 

15757 201 24X Fitfte 50-309. BS/10/ S3, B210Z00065 

9210350^160 Rpspqnie opposinij Bentible HE P-owi r 8209^4 (Sation for 
clarification t, mod oF ASLO B2041S order rifling On 
admmibLlitij of Pciuier propoiei) cantentioni Motion merely 
repeats argumenti already rejec terf Certificate of Svc and 
GUTIERREZ. J M Hearing Branch 3 B2/IO/14 Atc-mlc Eafeti) and 

Licensinj Doard Panel ipp 13703 106 24X Flcfie SO-SO 1 ?, 83/10/14, 
8210150460 

B21024O457 Forward* Saf Pomer fop ME. EG GarretliJB Green fc J Jfrabek 
requeit for I isujnc-o of show came ord*r to lleense-v 
MUBIlftY, p L Hurray, Plumb t, Kuri-aij MURRAV, P L Saf PWIT for 
Main* 32/10/20 DtrBctor'i Offietj nfflee of Inspection and 

Enforcement ip, 1 9BO7 123 B4K FlcJie 50-309.83/10/20.8510260*57 

S21026,Q4fi5 Safe Pouer IDT ME, E9 O.rrett.JB Qrven tc J Jr*b,l r. quest 
for t mo a tide of thou came orfler to licensee Adequate 
financial bacting muat be ihoun to rail* capital required 
to continue operations & to make capital fnveitntnt 
rtUHHAv.P L Safe Power for Halne KUftnAY, P L MurFau, Pljmh & 
Hui-rag 32/10/20 Director's office, Office of Iniptction and 

Enforcement 6pj> 15B07 124 34K Pick* 30-309,92/10/30, 
0210260457 

6510380227 Comment* on URC B210I3 Itr to ASLB re contention! Dicliion 
an mertti In Bip Rack Point cast dan na-t affect 
idmif stb il i tij of cantentlenl- In instant caie 
AHRENS.P Main*- State of 82/10/20 LAZO, R M . HAND, C, K , 
KORHIS.P A Atomic Safeti) and Licensing Board Panel Gpn 
15S37 083 24X Fiche 80-307, 82/10/30,8210260227 



rnu.it* fop docunenti 



9210290303 First set o* Interrojatorles 
Certificate of five end 
KILLER, |> 8 San&lbU Maine Pour MILLER, D 3 HilUnB G 
B2/10/25 Mains Vanl> Atomic Pauer Co 9pp 13853 170 

Fiche 50-309,92/10/28,821-0370303 



9210340202 Request* response to listed questioni re aMiflnnent at 
pronnel during shutdown d nature ot uorl personnel till] hi 



conducting at plant 
BARROWS, J Haine Nuclear Referendum Committee 
CLriRKifi A Operating Reactors Branch 3 Ip 
Fiche 30-307. 82/10/31. B210B<M202 



BS/10/2] 
1S004 S70 



P Operating licence stage documents E. correHpondsnca 

S310040074 Advlie* that Itoms 1,2 ic 3 of NRC Conf irmatOru Artl&n Lti 
Q2-01 have been satisfied per util S20202, S3 t, 030f] |tr 
Approval for facilitg restart requoited 

QAflRITViJ H Maine Yankee Atomic Poiuer Co 02/03/13 HAVNE'S C 
Rsoion 1, Office of Director CLARK, R A Operating Hearten Hrj 
3 Epp 155S1 141 24X Fiche 50-309, B2/03/ IS. B310040074 

B2I001000Q R.ipondt to FOIA request for 19 categories of dgcvBftir r 
nuclear reactor events & safetg problems Foriuardi docuninti 
Uited In App A 

FELTONj J M Division of Rules and Records S2/Ofi/ai5 UDElL.a i 
Critlral Mass Energy Project 15pp 15737 009 S4X 
Fch* 50-000.32/04/28,5310010009 

9204270049 Recommends prompt attention be given to problia if TII 
coolant pump closure stud corrosion dotec ted at FncjJHIri 
Response -b u 820415 requested 

EISENHUTiD Division of Licensing 82/03/24 HANAl>fl,9 K 
Diviuon of Systems Integration (post 311005) 3po ti>s* pi 
24X Fiche 30-0-00. 82/06/23, B310010008 

8210040077 Aitvlici that refueling water storage tank ]vl iHptl-L 
for au-tomatlc rec irculation actuation signal thould nol br 
changed tn short term, per 390727 Itr 

OftRRITViJ H Maine Vankee fltomic Pouer Co B2/07/2R HA>He.BI 
Region I, Office of Director 2pp 15391 270 24K 
Fich 50-307,92/07/30,9210040077 

B21004D217 Submits addl info to 320727 Itr re refueling, uitir u :r n 
tank UmB upper limit 5 uate r level louer limit Reanalym 
of HPSH for ECCB performance included safeguards pumpi, 
fluid i)i t< calculations of piping BUS 

tfARRITV, J H Maine Yankee Atomic Pouter Co 02/07/39 IU.VMS I [ 
Region 1. Office of Director 2pp 15Sa3-ilB 24X 
Fiche 50-309,92/07/37,8210040217 

B20-?2i0514 Requests addl info re reflponaes to NUflEO-0737. IttR 
III D 3 4, "Control Room HabI tabilii-y " Reiponie rnunlH 
ulthin 60 ddijs of receipt of Itr 

CLARK, R A Qperatins Reactors Oranch 3 52/09/01 OAfimll', J* 
KiEne Ytrtle* Atomic Power Co 2pp 14947 KOI 24 X 
Fiche 30-309, B2/09/01,8209210S14 

B209210923 Informs of acceptabi 1 i tg of control room hbi Ulll Ll t H, 
on llcemee r**ponses to NUREO-0737, Item III D 3 4 
Concluiloti bued on preient plant igs & preumn 
Implementation of effective HVAC mods 

MURPKV.D U Battelle Memorial Institute, Pacific Norlhuit 
Laboratory, FIN E-2323 B2/03/23 HULMAN. L Ac (Hint 
Evaluation Branch 3pp 14747203 24X FJche ' 30-309, 
S2092 10314. 

9310050497 Forwards Amend 63 to License DPR-3t, tut t tu vt)uJ 
notlc. of fs*u*nc t> availability Amend changes Tch Speu 
maCifig limitinj conditions for operation mora restrictive 
increaiing mtirvlllance requirements for vntll*tion tut 
NFLSON.C C Op*rating Reactors Branch 3 &2/09/07 
M*lne Ynfca Atomic Pouier Co 3pp 1362i 304 24K 
Fiche:SOi-309j 82/O9/07, B21 0050497. 

8810050503 Amend 63 to License DPR-36, changing Tch Bptct 1* 
limiting conditioni for op ar *tion more restrictive (c 
ncra*ing lUTveillance requirBmBnti for ventilation L 
filter tig i. 

CLARK, R A. Operating Reactors Branch 3 9S/09/Q7 H>f 
I36S6 307. 24X Flche SO-309. 82/09/07iB210030'1-97 

--8Z100S0503 BPiig evaluation supporting Amnil 63 to Ucrflii 
Dffleo op Nuclear Reactor Regulation, I>lrB:tor 
lift 13636.321 24X Fiche. 30-309, 83/09/07, B210Q5CH?7 

B2100BOS09 Notice of issuance tt availabilitu o* Aratnd 41 li I *. 
BPR-3A * 



CLARK, R A 



Operating Reactors Branch 3 B2/Q*}fQ7 
24X Fiche. 30-309, B2/09/07, S210030-I97 



DOCKETED ITEMS 



121 



B21QO4Q413 R-eq.ueits addl into re Q 10403 proposed mod to fech Spocs 
concerning j-nuobtir surveillance Response requested within 
3O days 

CLARK. R A Operating Heactors Branch 3 02/09/11 GARRITY, d H 
Maine Yankee Atomic Power CD 2pp 15597 235 34X 
Fi-che 5Q-3O9. 82/09/14,3210040413 



8210130360 Application to amend Ap-p A of License DPR-36. eonni*t ino. of 
Propoied Change 92. modi *y ing Tech Specs to rastrict 
op eration* uih en reactor protective ya channel* Ii ESF 
actuation iyi liniors bypased, 

RANDAZZA.J B Maine Yankee Atomic Power Co, B2/IO/07 CLARKi R A 
Operating Reactors Branch 3 2p-p 1567? 1 17 24X 
Fich* 50-309, B2/10/O7,Bai01303AO 



e2lQO4Q423 Advim that ubil response to MJREQ-0737, I tern 1 1 K. 3 3. 
"Reporting Relief 6 Safety Valve Failures !< Challenges." 
accep tab l-e 

HE I TWER, M L Operating Reactor' Branch 3 82/09/15 QAnfllTY.J H 
Maine Yankee Atomic Power Co Spp 15597 S39 2-1X 
Fiche 50-30?. 82/09/45. 9310040423 



B21O13O3A7 Proposed change* to Tech Spec 3 9, r-es trie ting operations 
uhn reactor protective &ys channel* !i EBF actuation *y* 
sen*ors bypassed 

* Ha in IP Vankee Atonic Power Co 82/10/07 ipp. 15679 119 2 -IX 
Fiehe 50-309,92/10/07,8310130-360 



6510070054 Forwards Amend 64 to License DPR-36 t. notice of issuance t, 
availability Amend requires raaint of safeguard! contingency 
-'* guard training & qualification plan 

HEITWER.K L Operating Reactor* Branch 3 02/09/15 OARRITY. J H 
Mains Yankee Atomic Ponier Co 4pp 13646 351 24X 
Fiche 50-309.63/09/15,8210070054 

S3 10070059 Amend 64 to License DPR-36. inc 1 ud ing requirement to maintain 
Commission approved guard training !t qualification plan 
CLftBK,R A Operating Reactors Branch 3 82/09/13 2pp, 
156,46 355 34X Fiche 30-309,02/09/15,0310070054 

B310G70060 Notice of issuance t, avai lahi 1 i tu of Amend M to License; 
DPfl-36 

CLARK, R A Operating Reactors Branch G 82/09/15 2pp 
15646 357 24X Fiche 9O-309, 02/09/ 15, B310070Q54 

B21G25Q367 Forwards audit rapt re procedures t< training on pressuriiod 
ther-mal shod containing specific recommendation for 
training program Requests summary of plans in response to 
T tt ommendatiDns uitfiin 45 days 

CLAHK, R A Operating Reactors Branch 3 B 2/09/23 &ARRITY .J H 
Maine Yankee Atomic Pouer Co 34pp 15807 341 24X 
FirhB 50-309,83/09/23.0210350267 

OS1O060171 Application for amend to Tech Specs App A re Cgcle 7 core 
p erf ornan c B analgsis 

RAIJDAZZA. J Mama Yankee Atomic Pouter Co 02/09/2? Office of 

Nuclear Reactor Regulation, Director 3pp 15614 06B 24X 
iFiche 50-309,82/09/29,9310060171 



821O27O008 Forward* Revision 2 to "Inservico Inap b Testing Pro-gram " 
OARRITY.J H Maine Yankee Atomic Ptnuer Co 02/10/12 CLARH. R A 
Operating Reactors- Branch 3 lp 15822 134 24 X 
Hen* 50-309, 82/lO/12,B21037000B 

B210S7OQO9 Reviiion 2 to 'Tnservlee Inip- EJ Taating Proflram " 
JONES, D L Maine Yankee Atomic Pouer Co 92/09/21 133pp 
ISB3S 135 24X Fich* 50-309,83/10/12,3210270008 

0210220203 Forwards addl info re "Environ Qualification of 
S*Petv-R>lati(f Electrical Equipment," Item A 1 HM W/n ancl 
OARRITV, J H Main* Yankee Atomic Pouer Co S2/10/1B CLflRK, R A 
Operating Reactors Branch 3 3pp 15776;35A 24X 
Fich* 50-309, B2/lt>/18,aai-03BOa03 

8210250098 Cl*Mfi NUrtEQ-0737, I tern 1 1 D 4 J , "Training for Mitigating 
Core Damag-e, " per NRC B20714 reques-t All repldcement 
llceniiad operator* & shift tcchnic-al advlvnr* receive 
training prior to assuming duties 

CARRITV.J H Maine Vankee Atonic Pouer Co 62/10/IB CLARK, R A 
Operating ReactoJ-i Branch 3 2pp 19787 1 09 24X 
Fiche 50-3O9, B2/1O/18, B21O2SO07B 

B21O230212 Informs that saturation monitor upgrading delagad due to 
e<LUi-prcent availability Rosemoutit reiiitance tamp detoctcri 
(RTD) ulll lie u*if in conjunction iu/it0am tables to provide 

adequate backup in case of Io*i of RTD indication 

OARR1TY.J H Maine Yankee Atonic Power Co 02/10/19 CLASH, R A 

Operating Reactor* Branch 3 2pp 15776-sa 1 ? 24X 

Fich* SO-309, 92/1O/19, 0210220812 



-SaiOO60173 ProposBii changes to Tech Specs re Cycle 7 core performance 
analijs i E 

Maine Yankee Atomic Power Co 02/09/29 36pp 15614 O71 24J( 
Ftehe 50-309,82/09/27,6210060171 



Notification of changed location for 021013 meeting lu/utils 
in Be-the-sda, MD to dlscuis Cycle 7 reload package 

H1TNER,K L Operating Reactors Branch 3 83/10/05 CLARK, R A 
Operating Reactors Branch 3 lp 15076 220 24X 
Fiche 50-309. 02/10/05. B210290160 

0310290165 Notification of 021013 meeting u/utiU in Be thenTa, MD to 
dltcuuo Cycle 7 reload package 

HEITNER.K L Operating Reactors Branch 3 02/10/05 CLARK, H A 
Operating Reactors Branch 3 2pp 1 5B66 360 34X 
Fiche 50-309,92/10/05,9210290165 

S31O13O2S2 Proposed Change 94 to License DPR-36, App A Hod renders RCB 
pouei operated relief valves temporarily inoperable during 
hydrostatic testing tuhen setpoint approached Approval 
requested prior to startup of Cycle 7 

RANDAZKt.J B Maine Yankee Atomic Power Co B2/10/07 CLARK, R A 
Operating Reactors Branch 3 3pp 13678 042 24X 
Fiche 50-309,82/10/07,3210130232 



8210260420 Advi that mi tallafcion of isolation valvaa In Istrinuin, 
team generator b 1 ouidoun tt auiiliary steam lire's uill not 
tie completeif during 1982 refueling dti to late equipment 
4>'liveri(. Initallatlon to be conpletvif tij n-eit oiitagv 
OARRITY.J H Maine Yankee Atomic Power Co. 82/10/21 CLARKrd A 
Operating Reactors Branch 3 lp. 15SO&314 24 X 
Ficnt 50-309, B2/10/21 , 821O26042O 

B210a001il Adviiee that selnnic design r-avteu re auiillaru feo>duiatar 
si^i saismlc qualification uill 1 not b* cpmpletd as 
committed to In vtt.1 B10B05 Itr but in accordance u/p]an 
praiented In utll B20621 Itr. 

OARRITV-J H Maine Yankee Atomic Pouer Co S2/10/22 CLARK, I) A 
Operating Reactor* Branch 3 lp 15937:209 24 X 
Fiche 50-309, 82/10/22, 0210230161. 

Q Inspection report!. IE Bulletins b corre-ipondence 

S21O07OOO7 Reiponili to FOTA request for oigJit <catagorie of rocoriS* re 
stejn generator* b iteam turbines App A document* provided 
in R UdilL FOIA Jtaqumt 81-313 Foruard* document* Hated in 
App B 

FELTONrJ M Division of Rule* and 1 Records 82/0 B/ 10- LOMO, D, J 
Utnthrop, Btimson, Putnam t> Rnberts. 9pp 1SA45 043 24 K 
Fiche 50-OQO, 82/Oe/lO, 8210070007 



S3 IO1 30354 Proposed Tech Spec Pages 3 3-1 through 3 3-3, render Ing RCS 
pouer-Qpera ted relief valves temporarilK inoperable during 
hijdro-s tatic testing wlitn setpoint approached 

* Maine Yankee Atomic Payer Co 82/10/07 3pp 1S67B 045 24X 
Fiche 30-309,83/10/07,8310130252 

9210130233 Proposed Change 95 to License DPfl-36, mod ifg Ing Tech Specs 
to satisfy generic concerns re containment purge t> vent sijs 
% tests required to verify valve operability for on-line 
purge It leakage rate of isolation valves 

flANQAZZA, J.B Maine Yankee Atomic Pouer Co 82/10/07 CLARH.fi A 
Operating Reactor* Branch 3 3pp 15678' a 97 B4X 
F L c ha- 50-307, 82/10/07, 8S101302S3 

B21Q1302B& Proposed Tech Spec changes re containment purge b vent sgs 
b tents required to veriftf valve operabi I ity for on-line 
purge 5< leakage rate of isolation valves 

flalne Yankee Atomic Power Co 82/10/07 Spp 1SA7B 30O 24X 
Fiche 50-3O9,82/10/07,82101302B3 



6210Q7O172 Forwards info re steam generator integr-Etij ti infp at all 

operating PHRs. p"T 7S032O & 21 requent* Detail* of insp*i 
including defect indication*, tube plugging crl-tvrla b tube* 
plugged uill not be provided oxcept for Point Dach I. 
OOLLER.K R Division of Reactor Licensing (NRR-1973 only) 
79/03/24 MACCARV, R.R Dlvltion c-f Technical Rovliu (NRR-1973 
only) Spp. 13643. 1^6 24X fiche 50-000,82/03/10,8210070007, 

B210O7O3S7 Foruards IE Enforcement Conference Rept 30-309/B2-14 on 
B20iO2 tc 0714 Ha noncomp 1 iance noted Enfrc emvnt action 
pending It uill be foruiarded under separate covar. 

8TARQBTECKI , R Divliion of Project b Rtiide-nt Pro D ram* 82/09/20 
RAN0AZZA. J B Hln Yankee Atonic: Power Co 9pp 13634 062 24X 
Fiche. 90-309, 812/09/2018210070357, 

B2100703BI IE Enforcement Conferane. Rept 5O~30-?/a214 on 920602 tc 

0711. Mo noncomplianc* note*, Ma jor arejii discussed NRC 
concerns re dtiign change control l> event reporting 
uakne*ss Identified in IE Insp Rept 50-309/02-O9, 
SHETLAND,? , 9ALLO, R Division of Projact fc Resident Programs 
82/09/09, Spp, 13634 064. 24X F eh e, 50-309, 02/09/20. B210070357 



122 



DOCKETED ITEMS 



6210060302 Reiponrft to 820708 requnfc tor Jdd 1 info re control element 
eitenblu fa fuel aitenblit fretting wear inipe 

CAHRITYiJ II mini VanLii fttom ! c Psuiir Co B2/0?/2B CLASH. R A 
Operating Re-iton Branch 3 4pp ISA I? 202 24* 
Flche, SO-309. B2/OW28,B21006Q302 

S21Q1S039B Faiurd< reipanie *D RC rBqueit for add I info rt IE 
Bulletin BO-ll, "Haionry Hall Drflgn " All required (nod* 
ineUllfd f>u 630301. Kith error detected yhicfi requires 
itr*ngthning of uill mill b* accampl iih*d at If 63 outage 
OARItm, J H Maine VinkBt Atomic Poutr Co 82/0-9/30 CtAflH. H A 
Operating Reactart Dnnch 3 7Bpp 13703 SB4 34 X 
Flch* 50-309, 82/09/30, 82I01!Oa?B 

9 20 B 190233 IE Info Notice BO-33, Suppl 1, "Lealing t. Dlilcdgid 1-125 
Impl-tnt BiJi " 6ve lilt incl 

COBB.L I Divltion of Fuel Fitilititi, HaterUll S, Safigutrdl 
B2/1-Q/06 Contolidated Ediian Co of Hem York 64pp 157il 250 

24 X rich* 50-000. B2/1G/OA.S209I 90233 



-B210S7Q177 LER B1-005/03L-0 on S10509, one of thi-ae BAB 
ewitehei failed to eloie Cauitd by matl incom 
Switch replaced w/improvBd model utillilng (talnleti 
In place of bran 

* Halm Van In Atomic Power Co 81/09/26 Report I, 

Philadelphia, Office of the Director (Bl/03/On l p 
B4K FIch t 30-309,81/05/26.8210370165 



0210290267 Part SI dtfUianty rtpt r potsntlal gallinj. pTttllft l 
tm ti Bonnat nf 1 2S-ineh d lrflr A105 carbon tteo-1 (, 
A1B7-F22 vilv*f ttipplltd Feb IfBl-Aug 19Q2 Valwei ihoulj J f 
KrvUad 6 itim 6 /or bonnot repUced 

IBABELLE.L D Conval, Inc Q2/10/11 WAYNES, R C H^]on I 
of ftlrtetor 17pp 15BS4 232 24X Fich 5O-000* B3/IOM1. 
8210-290247 



S21031001S Forward! LER B2-027/03L-0 

WOODiE C Haln Y*nt Atomic Poiuer Co 02/10/12 lUjloi 

Offict at DirtctDT lp 13766 021 24X Fichc 30-309, 
821021001 3 



8210210136 Formal-ill IE In*p R.pt 30-309/82-13 on 030726-30 Ho 
none amp I ianei nottd 

ALLAW, J H Rigion 1, Officr of Dlrotbor BS/ 10/04 RANDAZZA.J E 
M*ini Vankti Atomic POUBT C 2pp 1 57iS 107 2HX 
Flchv 50-30?, 82/10/06,0210210136 

0210310142 IE Imp Rtpt 90-309/B2-L2 an 820796-30 No TiDncampl ianc ir 
nottd hijor *TI Inipactitf o]louup of *mirgncy 
prtparinJon ittni from 910908-13 appraitat, 

UaJHAS,E J , CJIQCKERiH U DIviilon of Eniirgtncu Prtpjrcdnail Ir 
Op*rationl Eupport B2/09/30 llpp 19766 107 24 X 
Ficht 80-309,82/10/0^6210210136 



8210210019 LER B2-027/03L-0 on 930929. conta i nment iioUtldi i l|-j 
nfftn injection actuation sisnJl it**m stnirato-r blciuJ^gn 
Valv> BDr-T-32 fiilnd to fulli; cloBi Cauaed by \oon icriu- 
lodgd (t*tun iliik *< aeating surface Parts rplaca 
NELSON, H H Min Vankft Atomic PouifT Co ES/lOi'13 Rtimj 

Offlt* OP Dlr<tor lp 15766 022 24X Ftcfie 30-309, fitf/l O'Li 
8210210019 



0210260193 Foruardl LER S2-026/03L-0 

HOOD, E C Hi In* Yinkut Atomic Powtr Co B2/1O/IQ Hiflfln. I, 

OfCU* of Director IP 1DB04 272 24X Fich* SO-309. QlflQf Lfl 
3210260193 



8210210313 forujrdi IE Saf*g<u*rd* Imp R*pt SO-309/B5-11 on 830719-31 
t natict of violation 

KARTlNiT T Division of Enoiniirins t Tchnlcal Pvoor*m B2/10/07 
BAKDAZZA, J B Halnt Yatitti Atomic Pouir Co 2pp 15764 227 34 X 
FichB 50-309. 82/10/07,^210210313 

--9210210316 Notict of vUUUon from imp on 020719-21 

DiviilDn of EnglJittrlnj t Ttchnlcal FTogpairi B2/10/07 lp 
15764 327 24X Flch* 30-309. a?/l 0/07*62 1 0210313. 

8210210321 IE 3iftgmr<Ji Imp Ript SO-309/Ba-ll on B20719-21 
HoncDinplldiicB no-Ud failure ti> titablnh SNH eontro-1 h 
accounting procidurci to anui~ that isui-cti 1 -Jflttctari 
nc (iv*d. control l*dj Invtntori erf t. ihipped praptrlij 
KUSHHER.H,L , ODDY, A T DlvUion of ffnglntiriro A Thn(el 
Programi S2/OWH 7pp. 19764>a30, ?4X FicJlt 50-309, B2/10/07, 
BK 10210313 

92101^0178 Ack ncalpt of 820927 Itr [nformlng HRC of itepi talin to 
correct violations noted in IE Safeguard* Imp Rapt 
SO-30?/B1-0? CorrtctivB action* uJthhlif (rat 10CFJJ73 21). 
MAR T I Mi T T- Dlvltlon of Englnnring & Tichnieal Programi B2/10/Oa 
FtAMDAZZAiJ D. hi in. VntiB Atonic Pouftr Co Sop 15673 020 34 X 
Flch*' 50-369, 62/10'Oa, B2IOI30I7B 

B21027000B Foruardi ftviiion i to "Innrvic* Imp d Ttitlng Proji-am " 
OARHITY.J.H Malnt Vanl Atonic Poiur Co B2/IO./12 CLARK. R A. 
Opirafelng RvattcTi Branch 3 lp JS822 134 24 X 
Ftchf 90-309,62/10/12,6210270008, 



--621027000 1 ? Rfvltion 2 to 'Iniervlet Intp (. Tttting Pro 
JDNESjO L Hilnt Yantl* Atonic Poutl- C. BS/Qt/31, 
15B22.13S 2*K Fich*. 30-339, B2/10/ 12, 9210270003 



133pp 



620917023-a IE BulUtin 82-03, "Strut Corroclon Cracking in Thlck- 
WlliLara,~Diim*ttr.SUiM t it Steth Rvclrculation 9(ji 
Piping t BWR PUnti. " 8vc Hit *ncl. 

DEVOUNO,R.C. DlractOT'i Qffler Offic of Intpiction and 
En fore* mint. 82/10/H Coniolidatid Eli inn Co of Hcu fort 

119pp. ISQIO'129, E4X Ficht 90-000,92/10/14.6209190238 



B3 1 0240 200 LER ?a-026/03U-0 on 620924. ont steam gen*rto 
failn) to optrat* d tuo v*lv* operated -above Tech BJI 
limit* during tait Cauied bij instrument drift Cautt u^ 
initrumint drift unknown 

NELSOM.R H H*ini Vani.t Atomic Power Co 92/10/10 
Offic* of Dirtctor 2pp 15B04 273 24X Ficht 
B2 102601 93 



Higlcn t 



Foruarif* LER B2-028/03L-0 

WOOD, E C Main* Vantit Atomic Poutr Co S2/10/1E1 
Offio of Director lp 1579 146 24X Flch* SO- 
BK10Z&OI99 



831O260208 LEO 82-02B/03L-0 on B20929. conta Inmant liolilign L|<r, 
Ttt rttultcd in unip*ctfrf opening of control *lfnt 
drive fflichaniim coolir retui-n valve Caused bij op*n toll IT, 
Agaitat ESF reiet panal valve twitch control rUy 
NELSON. R H H*in* Yankee Atomic Pouiir Co Ba/ 10/10 Ri|iii 
Offlc* of Dirtctor 2pp 13799 149 34X Ficli* 30-30!,o;/i: I 
8210360 1 1 ? 1 ? 



8210760327 LER B2-029/01T-0- tehiluld edd v currant tnU of tint 
gntr*tor 2 tubai revealed tmall number of tubai irctedlij 
tube plugjlng limit 

OAftRlTVjJ H, Maine Yankee Atomic Pouer Co B2/IO/1Q PifUs 

Office of Director lp 1SB01.362 24X Fichu 50-30*. OS'lt'J'Je 
6510260337, 



8210270343 LER B2-029/01T-1 eddy current test* on ltel jinMil 
ttibei revealed 10 tubei etceeding tub* plugging limit Clulil 
bv ihort radiui bind tube degradation Condition *lto 
reported by ilmiler C-E plant 

OARRIT'i'-J H Mftin* Yanhee Atomic Foultr Co 62/10/19 RIJ 

Offie* o- Director lp. 1SBS3 02B 24X Ftefct. 90-309. IK/lfl' 
ezl02?03*3 



DOCKET 30-311 SALEM NUCLEAR OENERATINO STATION, UNIT 2 
F Securlt^i madlcali emergency & fire protection plant 



82102*0144 Fnruirdi addl info re IE Bulletin BO-ll. Tuo addl maionrv 
mail* identified In fuel bldg One null located inuth of 
pent fuel pool tc on* will adjacent to ventiUtian 
pinthouiB. Det Ign adequacy mill be ri-evaluatif. 

OARHITYi J.H. Maine Yankee Atonic Poorer Co 62/10/21. flLARK, R. A 
Operating R-ector Srinch 3. 2pp. 15799, OB7. 24X 
FJeJie 50-30?, 82/10/21, B2t0260I44 

3 Reportable occurrenceti LERi b related correipondence 

fl2lOS70l4S Foruarde LER 31-OOS/03L-0 

HOODiE C Heine Yankee Atomic Putr Co BHJOZ/2k Utaion \i 

Philadelphia, Qf'lee of the Dirictor (81/03/01). lp. 15922.385 

24 If FI Ch ~ ' *** -*"*** **..*eei*iwei _. ^ . - ^ . _ ' *'^ < " <ai. i - - 



8210290249 Friuar<li 19B2 FEHA/NRC obierved aiarciti icirtrla '*' 6- 
eierciia Revltioni reflect changee agr*ed upon during BIO'W 
meetlnj u/NRC t, FEHA 

ZUPKO, J, H. Public Service Electric h Qa Co. of Keu Jtrill 
B2/07/1&. HAYNE8.R C. Region 1, Office of Director H9lt 
137B<?;OOa 24K Flche SO-273,82/09/16, 8210260348 

BB 1026-03 IB F&rw*rdt eienption from requlremanti. of IOCFBSO *B T f" 1 
pratectlcn of tmfi ihutdoun capability 

VAR0A.S.A, Operating Reactort Braneh 1, 82/09/ii LH)fll",*t 
PiiBll<: Svrvlc* Electric t Oai Co, of Neui J>T*g 3pf I WO id 
34 K Flcfi,. 50-Z7H, B2/0?/16, 621026031B, 

--8210360921 ExaAptlon from requirement* of 1OCFR80 48 rt I In n* 
of iafe *hutdaun capability. 

EIBENHUf, D. 0, Divleton of Licencing 82/09/1* PUli! &*"' 

Electric b O*B Co of New Jeriey. 4pp, 19830 171 * 
Ftche: 3Q-373. 92/09/14, 8210240510, 



DOCKETED ITEMS 



123 



921oa&Q524 Safety evaluation supporting licensee request for exemption 
from requirements of IQCFRSO 48 re fire protection of i*fi 
shutdown capability 

* Office of Nuclear Reactor Regulation, Director 02/09/16 3pp 
15930 175 24X Fichu 50-272.02/09/16.8210260516 

SaiCHJi0431 Forwards eiemptien from requirements of Section IV F 1 of 
App E to IOCFRSO, to allow neit full-seal* emergency 
preparedness eierclse at Facility to be conducted on or 
about BS0939, granting S20709 request 

VABSA.S A Operatins Reactor* Branch I 02/09/23 UDERITZ, R A 
Public Service Electric & Qas Co of New Jersey 3pp 15636 337 
24K Fiche 50-272,02/09/23,0210060431 

--aaiO060433 Eiemption from I equipments of Section IV F I of App E ti 
lOCFR50,to alloiu neit full-scale emergency preparedness 
exercise at facility to be conducted on or about 02O927 
Evaluation end 

etSENHUT.D Division of Licensing 02/09/23 Public Service 

Electric !. 0*4 Co of New Jersey Spp 15636 230 24X 
Ffche 50-272,03/09/23.6210000431 

P Operating license stag! document* & correspondence 

e?IOO1000B Respond! to FO1A request for 19 categories of documents ro 
nuclear reactor events d safety problems Foruards documents 
1 i tted in App A 

FEL-TOM.j M Division of Rules and Records 82/06/29 UDELL, R A 
Critical Mass Energy Project ISpp 15737 005 24X 
Fiche 50-000, B2/06/30, 0210010000 



S Discusses addl required info to batter define potential for 
cracking in reactor vessel noliles 

MQOHAN, V S Assistant Director for Materials & Qualifications 
Engineering 00/05/05 TEDESCQ. R L Assistant Director for 
Licensing 2pp 15727 176 24X Fiche 50-000, 0S/06/2S, 621O01000g 