(navigation image)
Home American Libraries | Canadian Libraries | Universal Library | Community Texts | Project Gutenberg | Children's Library | Biodiversity Heritage Library | Additional Collections
Search: Advanced Search
Anonymous User (login or join us)
Upload
See other formats

Full text of "TITLE LIST OF DOCUMENTS MADE PUBLICLY AVAILABLE VOL 1 NO 2"

Available from 
National Technical Information Service 

Springfield, Virginia 22161 
Price: Printed Copy $9.50; Microfiche $3.00 

The price of this document for requesters outside 
of the North American Continent can be obtained 
from the National Technical Information Service. 



NUREG-0540 
Vol. 1, No. 2 
A5 



February 1 28, 1979 



Division of Technical Information and Document Control 

Office of Administration 

U.S. Nuclear Regulatory Commission 

Washington, D.C, 20555 



CONTENTS 

Preface v 

Contents Arranged by Docket Number vii 

Contents Alphabetic Arrangement by Licensee or 

Contents Facility Name xiii 

Docketed Items 1 

Low Level Radwaste Disposal Sites - Docket 27 1 

Domestic Licensing of Source Material - Docket 40 1 

Domestic Licensing of Production and Utilization 
Facilities - Docket 50 3 

Domestic Licensing of Special Nuclear 

Material - Docket 70 157 

Packaging of Radioactive Material for Transport and 

Transportation of Radioactive Material Under 

Certain Condtions - Docket 71 163 

Nondocketed Items 164 

Personal Author Index 189 

Corporate Source Index 198 

Citizen Group/Individual/Media 198 

Engineering and/or Construction and/or Consulting 198 

Educational Institutions 198 

Foreign Governments and Agencies 198 

Legal/Law Firms/Insurance Companies 198 

Local Government/ Agencies 199 

Medical Institutions/Labs 199 

Manufacturers/Equipment and Supplies 199 

Professional/Industry Institutions, Societies 200 

State Governments/ Agencies 200 

Other U.S. Federal Government Agencies 201 

Utilities, Power Reactors 201 

Research Institutions and Labs 208 

U. S. Nuclear Regulatory Commission 209 

Report Number Index 219 



in 



PREFACE 



The Title List of Documents Made Publicly Available is a monthly publication. It contains descriptions of 
the information received and generated by the U. S. Nuclear Regulatory Commission (NRC), This informa- 
tion includes (I) docketed material associated with civilian nuclear power plants and other uses of radioactive 
materials and (2) nondocketed material received and generated by NRC pertinent to its role as a regulatory 
agency. As used here, docketed does not refer to Court dockets; it refers to the system by which NRC 
maintains its regulatory records. This series of documents is indexed by a Personal Author Index, a Corporate 
Source Index, and a Report Number Index. 

The docketed information includes the information formerly issued through the Department of Energy's 
Technical Information Center under the title Power Reactor Docket Information (PRDI) and, in addition, 
information received or generated on other uses of radioactive materials. The last issue of PRDI, published 
in January 1979, was an annual cumulation of the information for 1978. The Title List series initialed by 
this document replaces PRDI, which will no longer be prepared. Plans for providing microfiche of the 
docketed material will be announced in a future issue of the Title List and in other mailings and 
announcements. 

We are making the monthly issues produced in 1979 available free to all who subscribed to PRDI in Calendar 
Year 1978. We are doing this to encourage your comments, criticisms, and suggestions. In particular, if 
there are title descriptions that are not meaningful, please let us know so that we can correct the data base. 
In so far as possible, we would like this document to be a valuable part of your reference material. Near the 
end of 1979, subscriptions will be solicited for Calendar Year 1980 at a fee yet to be established. 



DOCKETED ITEMS 

The principal elements of the docketed item entries are: 



7901010001 DOCKET 50-247 INDIAN POINT STATION, UNIT 2. 

(LER 78-031/03X-1 on 781022: One instrument channel of containment 
pressure safeguards logic became deenergized when static inverter associated 
with channel failed. Caused by defective static inverter. 
MAKEPEACE, J.M. Commonwealth Edison Co. 79/01/12. lp. 

1. NRC Accession Number. 

2. NRC Docket Number. 

3. Name of facility, licensee, or transportation package model number. 

4. Description of information contained in the document. 

5. Personal author. An asterisk in this position indicates that there is no personal author. 

6. Corporate, agency, or nonindividual source. 

7. Date of document described. 

8. Pages in document. 

9. If this space is blank, the document is available in the NRC Public Document Room, 1717 H St., N.W., 
Washington, D. C. 20555, If this space is filled, the entry may be "Available at NRC" with or without a 
price; "Available at NTIS";or "Available at GPO" . 



The Docketed Items list is arranged sequentially , first by Docket Number and then by Accession 
Number. Indented items are enclosures to nonlndented items and generally are out of Accession 
Number sequence. 

If the docketed document has a contract (FIN) number or a formal report number, it will appear in 
the last line of the item following entry 6. 

NONDOCKETED ITEMS 

The principal elements of the nondocketcd items are: 



7901060007 NUREG/CR-0161 

/ "Dynamic Analysis to Establish Normal Shock & Vibration Environs 
_ J Experienced by Radioactive National Shipping Package." Quarterly 
Q)i Progress Report 780101-780331. Identifies parameters wliich affect 
I normal shock & vibration environs. 

FIELDS, S.R., MECH, S.J. Hanford Engineering Development Laboratory. 
FIN A-2093J 78/1 1/30. 26pp. Available at NTIS. \ 

l.NRC Accession Number. 

2. NRC Report Number. 

3. Title and description of information contained in the document. 

4. Personal author(s). An asterisk in this position indicates that there is no personal author. 

5. Corporate, agency or other nonindividual source. 

6. Contract or financial (FIN) number (If any). If the document has a secondary report number it will 
appear following this entry. 

7. Date of document described, 

8. Pages in document. 

9. If this space is blank, the document is available in the NRC Public Document Room, 1717 H St., N. W., 
Washington, D.C. 20555, If this space is filled, the entry may be "Available at NRC" with or without a 
price; "Available at NTIS"; or "Available at GPO". 



The Nondocketed Items list is arranged sequentially by Accession Number. Indented items are 
enclosures to nonindented items, 

NOTES: 

1. The address for NTIS is: 



2. The address for GPO is: 



National Technical Information Science 
Springfield, Virginia 22161 



Superintendent of Documents 
Government Printing Office 
Washington, D. C. 20402 



VI 



CONTENTS 
ARRANGEMENT BY DOCKET NUMBER 



Docket Name 



27-039 Sheffield, !L.> Nuclear engineering 

Co., Inc. 

27-048 Richland, WA., Nuclear Engineering 

Co., Inc. 



40-0299 Union Carbide Corp. 

40-1162 General Electric Co., Aircraft 
Engine Group 

40-2259 Pathfinder Mines Corp. 

40-3453 Atlas Minerals 

40-6943 Standard Oil Co. 

40-7982 Honeywell, Inc. 

40-8027 Kerr-McGee Corp. 

40-8035 Cotter Corp. 

40-8040 Ccrac, Inc. 

40-8196 Wilmington Medical Center 

40-8200 Cleveland Cliffs Iron Co. 

40-8348 In Situ Uranium Leaching Project, 
Union 76 Exploration Co. 

40-8452 Bear Creek Mining Co. 

40-8502 Wyoming Mining Corp., Irigary 
Mine 

40-8566 Cleveland Cliffs Iron Co. 

40-8584 Union 76 Exploration Co. 

40-8602 United Nuclear Corp. 

40-8641 Energy Fuels Nuclear, Inc, 

40-8663 Nuclear Dynamics, Inc. 

40-8681 Energy Fuels Nuclear, Inc. 

40-8707 Envirologic Systems, Inc. 

40-8714 Cleveland Cliffs Iron Co. 



Page 



Docket 



1 


50-3 




50-5 


1 






50-10 




50-13 


I 






50-18 


1 






50-27 


1 






50-29 


1 






50-30 


1 






50-54 


2 






50-62 


2 






50-70 


2 






50-83 


2 






50-87 


2 






50-98 


2 






50-99 


2 






50-106 


2 


50-111 


2 






50-128 


2 


50-133 


2 


50-134 


2 






50-139 


2 




2 


50-151 


3 


50-155 


3 


50-156 


3 


50-160 



Name Page 

Indian Point Station, Unit I 3 

Pennsylvania State Univ. Research 4 
Reactor 

Dresden Nuclear Power Station, Unit 1 4 

Babcock & Wilcox Co. Critical 5 
Facility 

Vallecitos Boiling Water Reactor 5 

Washington Stale Univ. Research 5 
Reactor 

Yankee-Rowe Nuclear Power Station 5 

Plitm Brook Research Reactor 6 

Pawling Research Reactor 6 

Univ, of Virginia Research Reactor 6 

General Electric Test Reactor 6 

Univ. of Florida Training Reactor 7 

Westinglionse Critical Experiment 7 

Univ. of Delaware Research Reactor 7 

Babcock & Wilcox Test Reactor 7 

Oregon State Univ. Research Reactor 7 

North Carolina State Univ. Research 7 
Reactor 

Texas A & M Univ. Research Reactor 7 

Humboldt Bay Power Plant, Unit 3 7 

Worcester Poly tech Inst. Research 8 
Reactor 

Univ. of Washington Research 8 
Reactor 

Univ. of Illinois Research Reactor 8 

Big Rock Point Nuclear Power Plant 8 

Univ, of Wisconsin Research Reactor 8 

Georgia Institute of Technology 8 
Research Reactor 



vii 



Docket Name 

50-171 Peach Boltoni Atomic Power 

Station, Unit I 

50-183 Vallccitos Experimental Superheat 

Reactor 

50-185 Plum Brook Reactor - Mock-up 

50-186 Univ. of Missouri Research Reactor 

50-201 West Valley Reprocessing Plant 

50-206 San Onot'rc Nuclear Station, Unit 1 

50-213 Haddam Neck Plant 

50-2 1 9 Oysler Creek Nuclear Power Plant 

50-220 Nine Mile Point Nuclear Station, Unit 1 

50-224 Univ. of California Research Reactor 

50-237 Dresden Nuclear Power Station, Unit 2 

50-244 Robert Emmet Ginna Nuclear Plant, 

Unit 1 

50-245 Millstone Nuclear Power Station, 

Unit 1 

50-247 Indian Point Station, Unit 2 

50-249 Dresden Nuclear Power Station, Unit 3 

50-250 Turkey Point Plant, Unit 3 

50-25 1 Turkey Point Plant, Unit 4 

50-254 Quad-Cities Station, Unit 1 

50-255 Palisades Nuclear Plant 

50-259 Browns Terry Nuclear Power Station, 

Unit 1 

50-260 Browns Ferry Nuclear Power Station, 

Unit 2 

50-26 1 KB. Robinson Plant, Unit 2 

50-263 Monticello Nuclear Generating Plant 

50-265 Quad-Cities Station, Unit 2 

50-266 Point Beach Nuclear Plant, Unit 1 

50-267 Tort St. Vrain Nuclear Generating 

Station 

50-269 Oconee Nuclear Station, Unit 1 

50-270 Oconee Nuclear Station, Unit 2 

50-271 Vermont Yankee Nuclear Power 

Station 

50-272 Salem Nuclear Generating Station, 

Unit 1 

50-275 Diablo Canyon Nuclear Power Plant, 

Unit 1 



Page 


Docket 


8 


50-277 


8 


50-278 


9 


50-280 


9 


50-281 


9 


50-282 


9 


50-284 


10 


50-285 


11 


50-286 


12 


50-287 


13 


50-289 


13 






50-293 


15 






50-295 


16 


50-296 


17 


50-298 


18 


50-301 


19 


50-302 


20 


50-304 


21 


50-305 


22 


50-306 


24 






50-309 


25 


50-311 


26 


50-312 


27 


50-313 


28 


50-315 


29 






50-316 


30 






50-317 


31 




32 


50-318 


33 






50-320 


34 






50-321 


36 


50-322 



Name Page 

Peach Bottom Atomic Power Station, 37 

Unit 2 



Peach Bottom Atomic Power Station, 39 
Unit 3 

Surry Power Station, Unit 1 40 

Surry Power Station, Unit 2 41 

Prairie Island Nuclear Station, Unit 1 43 

Idaho State Univ, Research Reactor 43 

Fort Calhoun Station, Unit 1 43 

Indian Point Station, Unit 3 44 

Oconee Nuclear Station, Unit 3 45 

Three Mile Island Nuclear Station, 46 
Unit 1 

Pilgrim Nuclear Power Station, Unit 1 47 

Zion Nuclear Power Station, Unit 1 48 

Browns Ferry Nuclear Power Station, 50 
Unit3 

Cooper Nuclear Station 5 1 

Point Beach Nuclear Plant, Unit 2 52 

Crystal River Nuclear Plant, Unit 3 52 

Zion Nuclear Power Station, Unit 2 54 

Kewaunee Nuclear Power Plant 55 

Prairie Island Nuclear Station, 56 
Unit 2 

Maine Yankee Atomic Power Plant 57 

Salem Nuclear Generating Station, 58 
Unit 2 

Rancho Seco Nuclear Generating Station 58 

Arkansas Nuclear One, Unit 1 59 

Donald C. Cook Nuclear Power Plant, 60 
Unit 1 

Donald C. Cook Nuclear Power Plant, 61 
Unit 2 

Calvert Cliffs Nuclear Power Plant, 63 
Unit 1 

Calvert Cliffs Nuclear Power Plant, ^4 
Unit 2 

Three Mile Island Nuclear Station, 55 
Unit 2 

Edwin I. Hatch Nuclear Plant, Unit 1 66 

Shoreham Nuclear Power Station 68 



Docket 

50-323 

50-324 
50-325 

50-327 
50-328 
50-329 
50-330 
50-331 
50-332 
50-333 

50-334 
50-335 
50-336 

50-338 
50-339 
50-341 

50-344 
50-346 

50-348 

50-352 
50-353 
50-354 
50-355 
50-358 

50-361 
50-362 
50-363 
50-364 
50-366 
50-367 
50-368 



Name 

Diablo Canyon Nuclear Power Plant, 
Unit 2 

Brunswick Steam Electric Plant, 
Unit 2 

Brunswick Steam Electric Plant, 
Unit 1 

Sequoyah Nuclear Plant, Unit 1 
Seinioyali Nuclear Plant, Unit 2 
Midland Plant, Unit 1 
Midland Plant, Unit 2 
Dtianc Arnold Energy Center 
Barnwell Reprocessing Plant 

James A. Fitzpatrick Nuclear Power 
Plant 

Beaver Valley Power Station, Unit 1 
St. Lucie Plant, Unit 1 

Millstone Nuclear Power Station, 
Uni!2 

North Anna Power Station, Unit 1 
North Anna Power Station, Unit 2 

Enrico Fcrini Atomic Power Plant, 

Unit 2 

Trojan Nuclear Plant, Unit 1 

Davis-Bcsse Nuclear Power Station, 
Unit 1 

Joseph M, Farley Nuclear Plant, 
Unit 1 

Limerick Generating Station, Unit 1 
Limerick Generating Station, Unit 2 
Hope Creek Nuclear Station, Unit 1 
Hope Creek Nuclear Station, Unit 2 

WUliain H. Zimmer Nuclear Station, 

Unit 1 

San Onofre Nuclear Station, Unit 2 
San Onofre Nuclear Station, Unit 3 
Forked River Nuclear Station, Unit 1 
Joseph M. Farley Nuclear Plant, Unit 2 
Edwin I. Hatch Nuclear Plant, Unit 2 
Bailly Generating Station 
Arkansas Nuclear One, Unit 2 



Page 


Docket 


69 


50-369 


70 


50-370 


71 


50-373 




50-374 


73 






50-382 


74 






50-387 


75 




76 


50-388 


78 






50-389 


79 






50-390 


79 






50-391 


80 


50-395 


31 






50-396 


82 






50-397 


83 


50-400 


85 






50-401 


86 






50-402 


87 




89 


50-403 


90 


50-404 




50-405 


91 






50-409 


92 






50-410 


93 




93 


50-412 


94 


50-413 




50-414 


95 






50-415 


96 






50-416 


96 






50-417 


97 






50-423 


97 




99 


50-424 


100 


50-425 



Name 

William B. MacGuirc Nuclear Station, 
Unit 1 

William B. MacGuirc Nuclear Station, 
Unit 2 

LaSalle County Station, Unit 1 
LaSalle County Station, Unit 2 
Watcrforcl Generating Station, Unit 3 

Susquehannji Steam Electric Station, 
Unit 1 

Snsquehanna Steam Electric Station, 
Unit 2 

St. Lucic Plant, Unit 2 

Watts Bar Nuclear Plant, Unit 1 

Watts Bar Nuclear Plant, Unit 2 

Virgil C. Summer Nuclear Station, 
Unit 1 

Univ. of Virginia Cavalier Reactor 
WPPSS Nuclear Project, Unit 2 

Shearon Harris Nuclear Power Plant, 
Unit 1 

Shearon Harris Nuclear Power Plant, 
Unit 2 

Shearon Harris Nuclear Power Plant, 
Unit3 

Shearon Plarrls Nuclear Power Plant, 
Unit 4 

North Anna Power Station, Unit 3 
North Anna Power Station, Unit 4 
La Crosse Boiling Water Reactor 

Nine Mile Point Nuclear Station, 
Unit 2 

Beaver Valley Power Station, Unit 2 
CaEawba Nuclear Station, Unit 1 
Catawba Nuclear Station, Unit 2 
Brazil Nuclear Plant 
Grand Gulf Nuclear Station, Unit 1 
Grand Gulf Nuclear Station, Unit 2 

Millstone Nuclear Power Station, 
Unit 3 

Alvin W. Vogtle Nuclear Plant, Unit 1 
Alvin W. Vogtle Nuclear Plant, Unit 2 



114 
114 

115 

116 
116 
117 
118 

118 
118 
118 
118 

118 
119 
120 

120 
120 



Docket Name 

50433 UC - Santa Barbara Research 
Reactor 

STN-50-437 Floating Nuclear Pianl 

50438 Bellefonte Nuclear Plant, Unit 1 

50439 Bellefonte Nuclear Plant, Unit 2 

50440 Perry Nuclear Power Plant, Unit 1 

50441 Perry Nuclear Power Plant, Unit 2 

50443 Seabrook Nuclear Station, Unit 1 

50444 Seabrook Nuclear Station, Unit 2 

50445 Comanchc Peak Steam Electric 

Station, Unit 1 

50446 Comanche Peak Steam Electric 

Station, Unit 2 

STN-50447 GESSAR-238 

50448 Douglns Point Nuclear Station, Unit 1 

50449 Douglas Point Nuclear Station, Unit 2 

50454 Byron Station, Unit 1 

50455 Byron Station, Unit 2 

50456 Braidwood Station, Unit 1 

50457 Braidwood Station, Unit 2 

50458 River Bend Station, Unit 1 

50459 River Bend Station, Unit 2 

50460 WPPSS Nuclear Project, Unit 1 

50461 Clinton Power Station, Unit 1 

50462 Clinton Power Station, Unit 2 

50463 Fulton Generating S tation, Unit 1 

50464 Fulton Generating Station, Unit 2 

50466 Aliens Creek Nuclear Station, Unit 1 

50467 Aliens Creek Nuclear Station, Unit 2 
50-468 Laguna Verde Station, Unit 1 

STN-50470 CESSAR System 80 

50471 Pilgrim Nuclear Power Station, Unit 2 

50-472 Pilgrim Nuclear Power Station, Unit 3 

STN-50-477 Atlantic Generating Station, Unit 1 

STN-50-478 Atlantic Generating Station, Unit 2 

STN-50-482 Wolf Creek Generating Station 

STN-50-483 Galloway Plant, Unit 1 



Page 


Docket 


121 


STN-5 0-484 




STN-50-485 


121 






STN-5 0-4 8 6 


122 






STN-5 0-488 


122 






STN-5 0-489 


122 






STN-5 0-490 


123 






STN-5 0-491 


123 






STN-50-492 


124 






STN-5 0-49 3 


124 






STN-50-495 


126 


50-496 




50-497 


128 






STN-50-498 


128 






STN-5 0-499 


128 






50-500 


128 




129 


50-501 


130 






STN-50-502 


131 






STN-5 0-503 


132 






STN-50-508 


132 






STN-50-509 


132 






50-510 


132 






50-511 


132 






50-512 


133 






50-513 


133 






50-514 


133 






50-515 


133 






STN-50-516 


133 






STN-50-517 


133 






STN-50-518 


133 






STN-50-519 


133 






STN-50-520 


133 






STN-50-521 


134 






STN-50-522 


134 




136 


STN-50-523 



Name Page 

Tyrone Energy Fink, Unit 1 135 
Sterling Power Project, Nuclear, Unit 1 136 

Galloway Plant, Unit 2 136 

Perkins Nuclear Station, Unit 1 1 36 

Perkins Nuclear Station, Unit 2 137 

PeFkins Nuclear Station, Unit 3 138 

Cherokee Nuclear Station, Unit 1 139 

Cherokee Nuclear Station, Unit 2 139 

Cherokee Nuclear Station, Unit 3 139 

SWESSAR-P1 139 
Montague Nuclear Power Station, Unit 1 140 
Montague Nuclear Power Station, Unit 2 140 

South Texas Project, Unit 1 140 

South Texas Project, Unit 2 142 

Davis-Besse Nuclear Power Station, 144 
Unit 2 

Davis-Besse Nuclear Power Station, 144 
Unit 3 

Haven Nucleai Plant, Unit 1 144 

Haven Nuclear Plant, Unit 2 145 

WPPSS Nuclear Project, Unit 3 145 

WPPSS Nuclear Project, Unit 5 145 

Blue Hills Station, Unit 1 145 

Blue Hills Station, Unit 2 145 

Laguna Verde Station, Unit 2 145 

WPPSS Nuclear Project, Unit 4 145 

Pebble Springs Nuclear Plant, Unit 1 146 

Pebble Springs Nuclear Plant, Unit 2 146 

Jamcsport Nuclear Station, Unit 1 146 

Jatnesport Nuclear Station, Unit 2 147 

Hartsville Nuclear Plant, Unit 1 147 

Hartsville Nuclear Plant, Unit 2 147 

Hartsville Nuclear Plant, Unit 3 148 

Hartsville Nuclear Plant, Unit 4 148 

Skagit Nuclear Power Project, 143 
Unitl 

Skagit Nuclear Power Project, 149 

Unit 2 



Docket Name 

STN-50-528 Palo Verde Nuclear Station, Unit 1 

STN-50-529 Palo Verde Nuclear Station, Unit 2 

STN-50-530 Palo Verde Nuclear Station, Unit 3 

STN-50-531 GESSAR-251 

50-537 Clinch River Breeder Reactor 

STN-50-545 RESAR-35 

STN-50-546 Marble Hill Nuclear Station, Unit 1 

STN-50-547 Marble Hill Nuclear Station, Unit 2 

50-549 Greene County Nuclear Power Plant 

STN-50-55G GESSAR-238-BOP Interface 

50-553 Plripps Bend Nuclear Plant, Unit 1 

50-554 Pliipps Bend Nuclear Plant, Unit 2 

STN-50-556 Black Fox Station, Unit 1 

STN-50-5S7 Black Fox Station, Unit 2 



Page 


Docket 


150 


50-560 


150 


STN-50-566 


150 


STN-50-567 


ISO 


STN-50-568 


150 


STN-50-569 


151 


STN-50-580 


151 


STN-50-581 


151 


50-582 


151 


50-583 


152 


STN-50-584 


152 


STN-50-592 


152 


STN-50-593 


152 


50-596 


153 


50-597 



Name Page 

BOPPSAR 153 

Yellow Creek Nuclear Plant, Unit t 153 

Yellow Creek Niiclenr Plant, Unit 2 154 

NEP Nuclear, Unit 1 154 

NEP Nuclear, Unit 2 154 

Erie Nuclear Plant, Unit 1 155 

Brie Nuclear Plant, Unit 2 155 

Sundesert, Unit 1 155 

Simcleseit, Unit 2 155 

GIBBSAR 155 

Palo Verde Nuclear Station, Unit 4 156 

Palo Verde Nuclear Station, Unit 5 156 

New Haven, Unit 1 156 

New Haven, Unit 2 156 



xi 



CONTENTS 
ALPHABETIC ARRANGEMENT BY LICENSEE OR FACILITY NAME 



Name 

Richland, WA., Nuclear Engineering 
Co., Inc. 

Sheffield, IL,, Nuclear Engineering 
Co., Inc. 



Alias Minerals 

Bear Creek Mining Co. 

Ccrac, Inc. 

Cleveland Cliffs Iron Co. 

Cleveland Cliffs Iron Co. 

Cleveland Cliffs Iron Co. 

Cotter Corp. 

Energy Fuels Nuclear, Inc. 

Energy Fuels Nuclear, Inc. 

Envirologic Systems, Inc. 

General Electric Co., Aircraft 
Engine Group 

Honeywell, Inc. 

In Situ Uranium Leaching Project, 
Union 76 Exploration Co. 

Kerr-McGce Corp. 
Nuclear Dynamics, Inc, 
Pathfinder Mines Corp. 
Standard Oil Co. 
Union Carbide Corp. 
Union 76 Exploration Co, 
United Nuclear Corp. 
Wilmington Medical Center 
Wyoming Mining Corp., Irigary Mine 



Docket 


Page 


27-048 


1 


27-039 


1 


40-3453 


1 


40-8452 


2 


40-8040 


2 


40-8200 


2 


40-8566 


2 


40-8714 


3 


40-8035 


2 


40-8641 


2 


40-8681 


3 


40-8707 


3 


40-1162 


1 


40-7982 


2 


40-8348 


2 


, 40-8027 


2 


40-8663 


2 


40-2259 


1 


40-6943 


1 


40-0299 


1 


40-8584 


2 


40-8602 


2 


40-8196 


2 


40-8502 


2 



Name 

Aliens Creek Nuclear Station, Unit 1 
Aliens Creek Nuclear Station, Unit 2 
Alvin W. Vogtlc Nuclear Plant, Unit 1 
Alvin W. Vogtle Nuclear Plant, Unit 2 
Arkansas Nuclear One, Unit 1 
Arkansas Nuclear One, Unit 2 
Atlantic Generating Station, Unit 1 
Atlantic Generating Station, Unit 2 

Babcock & Wilcox Co. Critical 
Facility 

Babcock & Wilcox Test Reactor 
Ballly Generating Station 
Barnwell Reprocessing Plant 
Beaver Valley Power Station, Unit 1 
Beaver Valley Power Station, Unit 2 
Bellefontc Nuclear Plant, Unit 1 
Bellofonte Nuclear Plant, Unit 2 
Big Rock Point Nuclear Power Plant 
Black Fox Station, Unit 1 
Black Fox Station, Unit 2 
Blue Hills Station, Unit 1 
Blue Hills Station, Unit 2 
BOPPSAR 

Braidwood Station, Unit 1 
Braidwood Station, Unit 2 
Brazil Nuclear Plant 

Browns Ferry Nuclear Power Station, 
Unit 1 



Docket 


Page 


50-466 


133 


50-467 


133 


50-424 


120 


50-425 


120 


50-313 


59 


50-368 


100 


STN-50-477 


133 


STN-50-478 


134 


50-13 


5 


50-99 


7 


50-367 


99 


50-332 


79 


50-334 


80 


50-412 


118 


50-438 


122 


50-439 


122 


50-155 


8 


STN-50-556 


152 


STN-50-557 


153 


50-510 


145 


50-511 


145 


50-560 


153 


50-456 


130 


50-457 


131 


50-415 


118 



50-259 



24 



xlii 



Name Docket 

Browns Ferry Nuclear Power Station, 

Unit 2 50-260 

Drowns ferry Nuclear Power Station, 

Unit 3 50-296 

Brunswick Steam Electric Plant, Unit 2 50-324 

Brunswick Steam Electric Plant, Unit 1 50-325 

Byron Station, Unit 1 50-454 

Byron Station, Unit 2 50-455 

Galloway Plant, Unit 1 STN-50-483 

Galloway Plant, Unit 2 STN-50-486 

Calveit Cliffs Nuclear Power Plant, 

Unit! 50-317 

Calvert Cliffs Nuclear Power Plant, 
Unit 2 

Catawba Nuclear Station, Unit 1 
Catawba Nuclear Station, Unit 2 
CESSAR System 80 
Cherokee Nuclear Station, Unit 1 
Cherokee Nuclear Station, Unit 2 
Cherokee Nuclear Station, Unit 3 
Clinch River Breeder Reactor 
Clinton Power Station, Unit 1 
Clinton Power Station, Unit 2 

Comanche Peak Steam Electric Station, 

Unit 1 50-445 

Comanche Peak Steam Electric Station, 

Unit 2 50-446 

Cooper Nuclear Station 50-298 

Crystal River Nuclear Plant, Unit 3 50-302 

Davis-Bessc Nuclear Power Station, Unit 1 50-346 

Davis-Besse Nuclear Power Station, Unit 2 50-500 

Davis-Besse Nuclear Power Station, Unit 3 50-501 

Diablo Canyon Nuclear Power Plant, 

Unit 1 50-275 

Diablo Canyon Nuclear Power Plant, 

Unit 2 50-323 

Donald C. Cook Nuclear Power Plant, 

Unitl 50-315 

Donald C. Cook Nuclear Power Plant, 

Unit 2 50-316 



25 

50 
70 
71 
128 
129 
135 
136 

63 



50-318 


64 


50-413 


118 


50-414 


118 


STN-50-470 


133 


STN-50-491 


139 


STN-50-492 


139 


STN-5 0-49 3 


139 


50-537 


150 


50-461 


132 


50-462 


132 



124 

126 
51 

52 

89 

144 

144 

36 
69 
60 
61 



Name 

Douglas Point Nuclear Station, Unit 1 

Douglas Point Nuclear Station, Unit 2 

Dresden Nuclear Power Station, Unit 1 

Dresden Nuclear Power Station, Unit 2 

Dresden Nuclear Power Station, Unit 3 

Dunne Arnold Energy Center 

Edwin I. Hatch Nuclear Plant, Unit 1 

Edwin I. Hatch Nuclear Plant, Unit 2 

Enrico Fermi Atomic Power Plant, Unit 2 

Erie Nuclear Plant, Unit 1 

Erie Nuclear Plant, Unit 2 

Floating Nuclear Plant 

Forked River Nuclear Station, Unit 1 

Fort Callioun Station, Unit 1 

Fort St. Vrain Nuclear Generating 
Station 

Fulton Generating Station, Unit 1 
Fulton Generating Station, Unit 2 
General Electric Test Reactor 

Georgia Institute of Technology Research 
Reactor 

GESSAR-238 

GESSAR-238-BOP Interface 
GCSSAR-25 1 
GIBBSAR 

Grant! Gulf Nuclear Station, Unit 1 
Grand Gulf Nuclear Station, Unit 2 
Greene County Nuclear Power Plant 
H.D. Robinson Plant, Unit 2 
Haddam Neck Plant 
Hartsville Nuclear Plant, Unit 1 
Hartsvillo Nuclear Plant, Unit 2 
Hartsville Nuclear Plant, Unit 3 
Hartsville Nuclear Plant, Unit 4 
Haven Nuclear Plant, Unit 1 
Haven Nuclear Plant, Unit 2 



Docket 


Page 


50-448 


128 


50-449 


128 


50-10 


4 


50-237 


13 


50-249 


18 


50-331 


78 


50-321 


66 


50-366 


97 


50-341 


86 


STN-50-580 


155 


STN-50-581 


155 


STN-50-437 


121 


50-363 


96 


50-285 


43 


50-267 


30 


5U-463 


133 


50-464 


133 


50-70 


6 


50-160 


8 


STN-5 0-447 


128 


STN-50-550 


152 


50-531 


150 


STN-50-584 


155 


50-416 


118 


50-417 


119 


50-549 


151 


50-261 


26 


50-213 


10 


STN-5 0-5 18 


147 


STN-50-519 


147 


STN-50-520 


148 


STN-50-521 


148 


STN-50-502 


144 


STN-5 0-5 03 


145 



xiv 



Name 

Hope Creek Nuclear Station, Unit 1 

Hope Creek Nuclear Station, Unit 2 

Humboldt Bay Power Plant, Unit 3 

Idaho State Univ. Research Reactor 

Indian Point Station, Unit 1 

Indian Point Station, Unit 2 

Indian Point Station, Unit 3 

James A. Fitzpatrick Nuclear Power Plant 

Jamesport Nuclear Station, Unit 1 

Jamesport Nuclear Station, Unit 2 

Joseph M. Farley Nuclear Plant, Unit 1 

Joseph M, Farley Nuclear Plant, Unit 2 

Kewaimee Nuclear Power Plant 

LaCrosse Boiling Water Reactor 

Laguna Verde Station, Unit 1 

Laguna Verde Station, Unit 2 

LaSalle County Station, Unit 1 

LaSaile County Station, Unit 2 

Limerick Generating Station, Unit 1 

Limerick Generating Station, Unit 2 

Maine Yankee Atomic Power Plant 

Marble Hill Nuclear Station, Unit 1 

Marble Hill Nuclear Station, Unit 2 

Midland Plant, Unit 1 

Midland Plant, Unit 2 

Millstone Nuclear Power Station, Unit 1 

Millstone Nuclear Power Station, Unit 2 

Millstone Nuclear Power Station, Unit 3 

Montague Nuclear Power Station, Unit 1 

Montague Nuclear Power Station, Unit 2 

Monticello Nuclear Generating Plant 

NEP Nuclear, Unit 1 

NEP Nuclear, Unit 2 

New Haven, Unit 1 

New Haven, Unit 2 

Nine Mile Point Nuclear Station, Unit 1 



Docket 


Page 


50-354 


93 


50-355 


93 


50-133 


7 


50-284 


43 


50-3 


3 


50-247 


17 


50-286 


44 


50-333 


79 


STN-50-516 


146 


STN-50-517 


147 


50-348 


90 


50-364 


97 


50-305 


55 


50-409 


117 


50-468 


133 


50-512 


145 


50-373 


103 


50-374 


104 


50-352 


91 


50-353 


92 


50-309 


57 


STN-50-546 


151 


STN-50-547 


151 


50-329 


75 


50-330 


76 


50-245 


16 


50-336 


82 


50-423 


120 


50-496 


140 


50-497 


140 


50-263 


27 


STN-50-568 


154 


STN-5 0-569 


154 


50-596 


156 


50-597 


156 


50-220 


12 



Name 

Nine Mile Point Nuclear Station, Unit 2 
North Anna Power Station, Unit 1 
North Anna Power Station, Unit 2 
North Anna Power Station, Unit 3 
North Anna Power Station, Unit 4 

North Carolina State Univ. Research 
Reactor 

Oconee Nuclear Station, Unit 1 
Oconee Nuclear Station, Unii 2 
Oconee Nuclear Station, Unit 3 
Oregon State Univ. Research Reactor 
Oyster Creek Nuclear Power Plant 
Palisades Nuclear Plant 
Palo Verde Nuclear Station, Unit 1 
Palo Verde Nuclear Station, Unit 2 
Palo Verde Nuclear Station, Unit 3 
Palo Verde Nuclear Station, Unit 4 
Palo Verde Nuclear Station, Unit 5 
Pawling Research Reactor 

Peach Bottom Atomic Power Station, 
Unit 1 

Peach Bottom Atomic Power Station, 
Unit 2 

Peach Bottom Atomic Power Station, 
Unit 3 

Pebble Springs Nuclear Plant, Unit 1 
Pebble Springs Nuclear Plant, Unit 2 

Pennsylvania Slate Univ. Researcli 
Reactor 

Perkins Nuclear Station, Unit 1 
Perkins Nuclear Station, Unit 2 
Perkins Nuclear Station, Unit 3 
Perry Nuclear Power Plant, Unit 1 
Perry Nuclear Power Plant, Unit 2 
Phipps Bend Nuclear Plant, Unit 1 
Phipps Bend Nuclear Plant, Unit 2 
Pilgrim Nuclear Power Station, Unit 1 
Pilgrim Nuclear Power Station, Unit 2 



Docket 


Page 


50-410 


118 


50-338 


83 


50-339 


85 


50-404 


116 


50-405 


116 


50-111 


7 


50-269 


31 


50-270 


32 


50-287 


45 


50-106 


7 


50-219 


11 


50-255 


22 


STN-50-528 


150 


STN-50-529 


150 


STN-50-530 


150 


STN-50-592 


156 


STN-50-593 


156 


50-54 


6 


50-171 


8 


50-277 


37 


50-278 


39 


50-514 


146 


50-515 


146 


50-5 


4 


STN-50-488 


136 


STN-50-489 


137 


STN-50-490 


138 


50-440 


122 


50-441 


123 


50-553 


152 


50-554 


152 


50-293 


47 


50-471 


133 



Name 

Pilgrim Nuclear Power Station, Unit 3 

Plum Brook Reactor - Mock-up 

Plum Brook Research Reactor 

Point Ueach Nuclear Plant, Unit 1 

Point Deach Nuclciir Plant, Unit 2 

Prairie Island Nuclear Station, Unit 1 

Prairie Island Nuclear Station, Unit 2 

Quad-Cities Station, Unit 1 

Quad-Cities Station, Unit 2 

Rancho Scco Nuclear Generating Station 

RESAR-3S 

River Bend Station, Unit 1 

River Bend Station, Unit 2 

Robert Emmet Ginna Nuclear Plant, 
Unit 1 

Salem Nuclear Generating Station, 
Unit 1 

Salem Nuclear Generating Station, 
Unit 2 

San Onofre Nuclear Station, Unit 1 
San Onofie Nuclear Station, Unit 2 
San Onofie Nuclear Station, Unit 3 
Seabrook Nuclear Station, Unit 1 
Seabrook Nuclear Station, Unit 2 
Sequoynh Nuclear Plant, Unit 1 
Scquoyali Nuclear Plant, Unit 2 

Shcaron Harris Nuclear Power Plant, 
Unit 1 

Shearon Harris Nuclear Power Plant, 
Unit 2 

Shearon Harris Nuclear Power Plant, 
Unit 3 

Shearon Harris Nuclear Power Plant, 
Unit 4 

Shoiehain Nuclear Power Station 
Skagit Nuclear Power Project, Unit 1 
Skagit Nuclear Power Project, Unit 2 
South Texas Project, Unit 1 
South Texas Project, Unit 2 



Docket 


Page 


50-472 


133 


50-185 


9 


50-30 


6 


50-266 


29 


50-301 


52 


50-282 


43 


50-306 


56 


50-254 


21 


50-265 


28 


50-312 


58 


STN-50-545 


151 


50-458 


132 


50-459 


132 


50-244 


15 


50-272 


34 


50-311 


58 


50-206 


9 


50-361 


95 


50-362 


9C 


50-443 


123 


50-444 


124 


50-327 


73 


50-328 


74 


50-400 


113 


50-401 


114 


50-402 


114 


50-403 


115 


50-322 


68 


STN-50-522 


148 


STN-50-523 


149 


STN-SQ-498 


140 


STN-50-499 


142 



Name 

Sterling Power Project, Nuclear, Unit I 

St. Lucic Plant, Unit I 

Si. Lucie Plant, Unit 2 

Sundesert, Unit 1 

Sundcsert, Unit 2 

Surry Power Station, Unit 1 

Siirry Power Station, Unit 2 

Susquelianna Steam Electric Station, 
Unit 1 

Susquehainiji Steam Electric Station, 
Unit 2 

SWCSSAR-P1 

Texas A&M Univ. Research Reactor 

Tlirce Mile Island Nuclear Station, 
Unit I 

Three Mile Island Nuclear Station, 
Unit 2 

Trojan Nuclear Plant, Unit 1 
Turkey Point Plant, Unit 3 
Turkey Point Plant, Unit 4 
Tyrone Energy Park, Unit 1 
UC - Santa Barbara Research Reactor 
Univ. of California Rescarcli Reactor 
Univ, of Delaware Research Reactor 
Univ. of Florida Training Reactor 
Univ. of Illinois Research Reactor 
Univ. of Missouri Research Reactor 
Univ. of Virginia Cavalier Reactor 
Univ. of Virginia Research Reactor 
Univ. of Wisconsin Research Reactor 
Univ. of Washington Research Reactor 
Vatlccitos Dolling Water Reactor 

Vallecitos Experimental Superheat 
Reactor 

Vermont Yankee Nuclear Power Station 

Virgil C. Summer Nuclear Station, 
Unit 1 

Washington State Univ. Research 
Reactor 



Docket 


Page 


STN-5Q-485 


136 


50-335 


81 


50-389 


109 


50-582 


155 


50-583 


155 


50-280 


40 


50-281 


41 



50-387 

50-388 

STN-50-495 
50-128 

50-289 



105 

107 

139 

7 

46 



50-320 


65 


50-344 


87 


50-250 


19 


50-251 


20 


STN-50-484 


135 


50-433 


121 


50-224 


13 


50-98 


7 


50-83 


7 


50-151 


8 


50-186 


9 


50-396 


111 


50-62 


6 


50-156 


8 


50-139 


8 


50-18 


5 


50-183 


8 


50-271 


33 


50-395 


110 


50-27 


5 



xvi 



Name Docket Page 

Waterford Generating Station, Unit 3 50-382 105 

Walts Bar Nuclear Plant, Unit 1 50-390 109 

Watts Bar Nuclear Plant, Unit 2 50-391 110 

Westinghouse Critical Experiment 50-87 7 

West Viillcy Reprocessing Plant 50-201 9 

William B. MacGuirc Nuclear Station, 

Unit I 50-369 101 

William I). MttcGnirc Nuclear Station, 

Unit 2 50370 102 

William H. Zimmer Nuclear Station, 

Unit 1 50-358 94 

Wolf Creek Generating Station STN-50-482 134 



Name Docket I*^ 

Worcester Polytedi hist. Research 

Reacior 50-134 H 

WPPSS Nuclear Project, Unit 1 50-460 1 32 

WPPSS Nuclear Project, Unit 2 50-397 1 1 2 

WPPSS Nuclear Project, Unit 3 STN-50-50S 1 45 

WPPSS Nuclear Project, Unit 4 50-5 13 I 45 

WPPSS Nuclear Project, Unit 5 STN-50-509 1 45 

Yankec-Rowe Nuclear Power Station 50-29 5 

Yellow Creek Nuclear Plant, Unit I STN-50-566 1 53 

Yellow Creek Nuclear Plant, Unit 2 STN-50-567 1 54 

Zion Nuclear Power Station, Unit 1 50-295 48 

Zion Nuclear Power Station, Unit 2 50-304 54 



XVII 



DOCKETED ITEMS 



LOW LEVEL RADWASTE DISPOSAL SITES 



7902140099 DOCKET 37-O39 Sheffield, IL, , Nucloar Engineering Co. 
Forwards "Site Stratigraph Ic Study - Shof field, IL Lou Level 
Radioactive Haste Disposal Site" dtd 790123. responding to 
NRC 771216 & 7B0013 requests for aildl info. 
HAEFli T. S, Arco Petroleum Products Co. 79/01/25. 2pp. 



DOMESTIC LICENSING OF SOURCE MATERIAL 

7902140017 DOCKET 40-0299 Union Carbide Corp. 

Responds lo Dec 1976 EPA stds d the plan to conform w/flLARA 
requirement of 1OCFH20. LI sts equipment. anci 1 lary 
instrumentation b maint. , 
WONQ. T. Union Carbide Corp. 79/01/23, 3pp. 



7902140102 DOCKET 37-039 Sheffield. IL. . Nuclear Engineering Co. 
"Site StratigrapliU Study - Sheffield, IL Lou Level 
Radioactive Haste Disposal Site." 
* Arco Petroleum Products Cn, 79/01/23. 101pp. 

790206017S DOCKET 37-039 Sheffield, IL. . Nucloar Engineering Co. 
Informs that intervenor H Schieler requests permission to 
insp tunnel at nuclear disposal site on 790103. Certi ficate 

HCRAE, D. J. D. J. McRae 5. Johnson. Martin fc Russell. 79/01/03. 2p. 

7902260535 DOCKET 27-039 Sheffield, IL. . Nuclear Engineering Co. 
Intervenor County of Bureau, IL. objects to suspension of 
licensing proceed Ings, cross-moves for dismissal or denial 
of Nuclear Engineering Go's eipansion site application. 
Affidavit & Certificate of Bvc end. 
MAD80N.B., HOLLERICH, C. J. Illinois, State of. 79/01/13, 6pp. 



7903050293 DOCKET 37-039 Sheffield. IL. . Nuclear Engineering Co. 
Memorandum of intervenors Schieler, et al.ln opposition to 
applicant's motion to suspend further proceedings! f i Us 
cross-motion to dismiss or deny mot i on. Requests oral 
argument in site proceedings. Certi fi cate of Bvc encl. 
MCRAE, D, J. D. J. McRae & Johnson. Martin t, Russell. 79/01/16. 



17pp. 



7902260618 DOCKET 40-1162 Western Nuclear 

No comments on DE13 (NUHEQ- Q451 > for Split Rack U mill. 
DICKSQN.F.S. Wyoming, State of, 79/01/15. Ip. 

7902380527 DOCKET 40-1162 Western Nuclear 

Comments on DEIS (NUREO-0451 >: notes concern re radioactive 
chemicals, tailing pond* erosion, pond seepage of affluents & 
other environ problems. 
PORTER, 0. T. Wyoming Outdoor Council. 79/01/19. Spp. 

7902H0424 DOCKET 4O-1162 Western Nuclear 

Forwards assessment of radiological impact of mil 1. Expresses 
serious doubt about effectiveness of dirt cover & sand dam, 
which are prone to severe erosion, Estimates Th in tailings 
will hill 22.000 million people. 
LOCHBTET.U. A. Pennsylvania State Univ. 79/01/22. Spp. 

7902140441 DOCKET 40-1162 Western Nuclear 

Ack receipt of draft environ statement for operation of 

mill, but will be unable to comment in timely manner, Reserves 

right to comment prior to issuance of license. Lists 

evaluative criteria. 

WALL. L. 8. Advisory Council on Historic Preservation. 79/01/S3, 

2pp. 



7902060337 DOCKET 27-039 Sheffield, IL. , Nuclear Engineering Co. 
Licensee's answer to IL 790109 memo, oppos ing applicant's 
motion to suspend further proceedings & cross-motion to 
dismiss or deny. Certi ficate of Bvc encl. 
CONNER, T. B. Connor, Moore Si Corbop. 79/O1/22, IBpp. 

79023B01BO DOCKET 27-039 Sheffield, IL. , Nuclear Engineering Co. 
Forwards 79011B 1 tr from IL EPA re Nuclear Engineering Co 
special waste disposal site at Bhef f i eld, IL, 
DHAOONETTE. K. S. Lou Lflvel Haste Branch. 79/01/24. 3pp. 



79022B0213 DOCKET 40-1162 Western Nucloar 

Submits rept re effluents released to unrestricted areas for 

period 7807O1 to 790101. 

BLAIR, P. L. Computer Systems Support Corp. 79/01/29. Ip. 

7902220103 DOCKET 40-1162 Western Nuclear 

Provides comments on DES to assure that FES will be more 
complete 5. accurate in consideration of wildlife resources. 
Discusses surface mater, vegetation & various wildlife oP 
area. Concludes data not site-specific. 
DEXTER, W. D, Wyoming, State of. 79/01/31. 4pp. 



79022B01B1 DOCKET 27-039 Sheffield, IL. , Nuclear Engineering Co. 
In response to 7B1S1S 1 tr re Nuclear Engineering Co special 
waste disposal si to, forwards addl info re location of 
buried chemical mantes, monitor ing of data from site, borings 
info, details an berm t< evaluative criteria. 
PEHTILLI, J. F. Illinois, State of. 79/01/1B. 50pp. 



7903320342 DOCKET 40-1162 Western Nuclear 

Forwards response to 7B120S request for addl info re 
geology, seismology, & geotechnlcal engineering at tailing 

RANBOMEiJ. W. Computer Systems Support Corp. 79/O3/O5, 120pp. 



7902140076 DOCKET 27-039 Sheffield, IL. , Nuclear Engineering Co. 
Supports cross-motions of intervenops to dismiss or deny 
application for site expansion based on similar NRC croes- 
motion fc due to applicant's refusal to supply info. 
Certificate of Svc encl. 
RE1S, E. J. Hearings Division. 79/O1/23. 3pp'. 

7902330198 DOCKET 27-039 Sheffield, IL. , Nuclear Engineering Co. 
Intervenor's response opposing cross-motions to dismiss or 
deny. Urges that no justification exists to interrupt 
operations & that applicant has supplied all requested Info. 
CANNON, J. M. Affiliation Unknown. 79/O2/06. 3pp. 

7902140208 DOCKET 27-039 Sheffield. IL. , Nuclear Engineerinu Co. 
Licensee's answer to intervenops' memorandum opposing motion 
to suspend further proceedings & cross-motion to dismiss or 
deny. Responds to NHC's opposition to suspension. Certificate 

CONNER. T. D.', WETTERHAHN. M. J. Connor, Moore 8, Corbop. 79/02/01. 
17pp. 

79030B0001 DOCKET 27-04S Rlchland, WA. .Nuclear Engineering Co. 
Partial response to 7B0322 requost for addl info. Forwards 
portions of document which will,mhen complete, address all 
topics mentioned in request, including KEND code.W/encl 
pertinent portions of referenced documents. 

BAER.T.S. Nuclear Engineering Co., Inc. (subs, of Teledyne. Inc.). 
79/01/30. Spp. 

79020B0004 DOCKET 27-048 Richland, WA., Nuclear Engineering Co. 
Completed portion of "Hanford Commerial Lou Level Waste 
Disposal Facility. " Finished rept ulll be submitted early 
March 1979. 

Nuclear Engineering Co.. Inc. (subs, of Teledune, Inc.). NECO 
79-001. 79/02/2B. 390pp. 



7903360011 DOCKET 40-3339 Pathfinder Mines Corp, 
Forwards tailing mgt alternatives For U mills for 
eiamlnation of long term stability characteristics per ORNL 
contract. Requests that throe specific cap elemental failure 
modes be Included in review, W/o encl, 

BCARANO.R.A. Division of Fuel Cycle d Material Safety. 79/03/03. 
2pp. 

7902010340 DOCKET 40-3433 Atlas Minerals 

Forwards FES (NUREQ-Q453) on considerations re Moab U mill. 
8CARANO, R.A, Fuel Process, S. Fab. Branch, 79/01/33. Ip, 

7903010251 DOCKET 40-3453 Atlafl Minerals 

Notice of availability of FES (NUREQ-0453) For Moab U mill. 
SCARANQ. It. A. Fuel Process, b Fab. Branch. 79/01/19. 2gp, 

79020102S7 DOCKET 40-3433 Atlas Minerals 

FES re application for renewal of source matl license 
SUA-917. Discusses existing environ, operations, environ 
effects, monitoring programs, alternatives It cost-benefit 
summary. Relicensing approved. 

Office of Nuclear Material Safety t< Safeguards. NUREO-04S3. 
79/01/31. 200pp. Available at NTIS. 

7903210131 DOCKET 40-6943 Standard Oil Co. 

License renewal application for Btd Oil Co to retain source 
matl in amount of 400 Ib of U oxide. 
BROWN. 0. R. The West Co. 79/01/03. 14pp. 

7902020001 DOCKET 40-6943 Standard Oil Co. 

Foruards info rs 790103 application for renewal of Source 
Hatl License SUD-6B6, Renewal fee application sent to 
Licensing Staff for processing. 
JACKSON, G. License Fee Management Branch. 79/01/10. Ip. 



DOCKETED ITEMS 



7902140091 DOCKET 40-7762 Honeywell 

Application #01- ran-eual of Source Matl License BUD-971 fur 
Honeywell to use 3QO. 000 kg U-235 For development, mfg, test ti 
analysis of ordnance device). W/enc 1 supporting documentation 
Including handling procedures ! drawings. 
BUTTON, M. A. Hydrocarbon Research. 79/01/26, 49pp. 



79Q22I0003 DOCKET 40-6348 In Situ Uranium Leaching Project 
Forwards synopsis of research in iltu U leaching test 
project. Plans addl aquifer monitoring to determine 
stabliiation of restored aquifer for Spring b Summer op 
1979. 
QOTH.W.C. National Nuclear Corp. 79/01/34. BOpp. 



79022H0389 DOCKET 40-B027 Kerr-McQee Corp. 

Forwards IE Investigation Rept 7B-02 on 7B1204-05 re LUense 
BUfl-lOlO.Np noncompllance noted. 

BHQWN.C.D. Region 4, Dallas. Full Facility & Materials Safety 

Branch. 79/O1/10. 3pp. 

7902280394 DOCKET 40-80S7 Kerr-McQee Corp. 

IE Investigation Kept 7B-02 on 791304-05. No noncompl iance 

noted. Major areas inspected: 7Q1201 incident In which about 

7OO lig natural U in form of nitrates was discharged into IL 

River. H/encl pertinent documents. 

BROUN.Q.D. Region 4, Dallas, Fuel Facility & Materials Safety 

Branch. EVERETT, R. J, Region 4. Dallas, Office of the Director. 

79/01/10. 19pp. 



7902260011 DOCKET 40-0432 Bear Crek Mining Co. 

Forwards tailing mgt alternatives for U mills for 

e lamination of long term stability character 1 sties por ORNL 

contract. Requests that three specific cap elemental failure 

modes be Included in revleiu. U/o and. 

BCARANO.R.A. Division of Fuel Cycle & Material Safety. 77/02/OB. 

2pp. 

7902280246 DOCKET 40-8452 Bear Creek Mining Co. 

Follow! up 790129 telcon re lou volume air quality sltai. 

Intends to relocate loin & high volume air quality samplers 

to same local*. U/oversiie map. 

MEDUOCKi Ft. L. Pullman, Inc., Pullman Power Products Dtv. 79/03/09. 

2pp. 



7902090099 DOCKET 4O-B035 Cotter Corp. 

Responds to 780919 1 tr re proposed use of airport property 
t foruiards decontamination plans for removal of contaminated 
lot 1 from site. 
CROH.W.T. Fuel Process. It Fab. Branch. 78/11/09, 13pp. 



7902090402 DOCKET 40-3502 Wyoming Mining Corp. 

Requests remittance of minor safety 1 environ amend fee of 
760.00 pursuant to 79O109 request for amend to License 
8UA-1341 for alternate lliivlant program. 
WEISS, D. License Fee Management Branch. 79./O1/16. Ip. 



7902090084 DOCKET 40-BQ33 Cotter Corp. 

Forwards decontamination plans For removal of contaminated 
soil on property Formerly used by airport. W/enc 1 Itr to 
Airport Authority re NJ1C plans. Hill provldi radiological 
monitoring during decontamination tt stabl 1 1 lation. 
CROH.U.T. Fuel Process. !i Fab. Dranch. 79/01/09. Ip. 



7902140243 DOCKET 40-BSQS Wyoming Mining Corp. 

Informs that Licinse to Explore No 8 at irigary mini site 
will not autnorlie testing of alternative 1 i a iviants. Request 
to test alternative llxiviants must be submitted in writing 
u/Bupporting technical data. 
ACKERHAN, M. C. Wyoming, State of. 77/01/24. 2pp. 



7902270400 DOCKET 40-8035 Cotter Corp. 

Forwards 79011S Itr from Congressman (JA Young cautioning 
against transfer of radioactive residues from Latty Avenue 
site. Requests delay In Implementation of transfer until 
dl f Perence* can be reialved. 
CHIOSS.L.L. St. Louis, MO. 79/01/23. 3pp. 



79022AOBB1 DOCKET 40-3040 Cerac 

Forwards IE Insp Rept 40-8040/78-02 on 781030-1101 

subsequent to 7BIO30 fire i 30-day rept. No noneomp 1 lance 

noted. 

DAVIS, A. B, Region 3. Chicago. Fuel Facility & Materials Safety 

Branch. 79/Q1/10. 2pp. 

7902260SB6 DOCKET 40-8040 Cerac 

IE Insp Rept 40-0040/73-03 on 781030-1 101. No noneomp 1 iance 
noted. Major areas inspected: circumstance* re 781030 fire in 
plant eihaust sy *, effluents released, personnel exposure f. 
preventive action. W/*upporting Info. 

FINN.J.A.i OBERO.C.T., PAPEFHEULQ. C. J. Region 3, Chicago. Offl 

of the Director. 79/01/12. 34pp. 

7903060086 DOCKET 40-3196 Wilmington Medical Center, UI 
Ac! receipt 781214 Itr informing NRC of steps taken to 
correct violations noted during insp 30-123/78-01. 
30-1303/7B-01, b 40-8196/70-01. 

DRIER, B.H. Region. 1, Philadelphia, Office of the Director. 

79/O1/10. Ip, 



7902060090 DOCKET 40-B196 Wilmington Medical Center, MI 
Responds to NRC 7B1122 Itr re violations noted in IE Imp 
Repts 30-1303/7B-0 1,30- 123/70-01, 40-B19i/7B-01. Corrective 
actions; ini tiate mgt control iys ro radiation safety 
program. Consultant 's proposal end. 
CANNONiH.L. Hilminnton Medical Center. 78/12/1-1. 41pp. 

7902060092 DOCKET 10-BI96 Wilmington Medical Center, HI 
Discussti IE Insp flepts 30-1303/78-01,30-122/78-01, & 
40-BI9i/7B-01 on 700921, 23. 7B101 1-12 t IB. Forwards notice 
af Violation. 

CRIEH.B.H, Region 1. Philadelphia. Office of the Director. 

7H/11/22. 3pp. 

7902060073 DOCKET 40-B196 Wilmington Medical Center. WI 
Notice of violation from Insp on 780921,23,701011-12 & 18. 
Moncomplianee noted: inadequate mgt control ays to monitor 
radiation Bposures. required radiation surveys not performed 
an patients, licensed ma tit improperly stored. 
* Reiion 1, Philadelphia, Office of the Director. 78/11/22. 



7902310036 DOCKET 40-B302 Wyoming Mining Corp. 

Foruiards "Irigamy Mine BiteQuarterly Rept 1." 7BOQlfl-1231 

per HY Permit 478. 

WICHER8, D. L. P. H. Olatfelter Co. 79/01/26. 90pp. 

7902090031 DOCKET 40-BS66 Cleveland-Cliffs Iron Co. 

Clarifies docket numbers for In *ltu R&D applications as 
requested In 7B1116 Itr. All future submittals re Collins 
Draw operation should refer to Docket 40-8714. Docket 40-8200 
refers to North Rolling Pin test site. 
CROW.W.T. Fuel Process, b F*b. Branch. 79/01/08. 3pp. 

7902060027 DOCKET 40-B5S4 Union 76 E*plortion Co. 

Forwards Union Minerals operator bond for Sueetuater Uranium 
project as requested on 790111 by J Linehan. 
MARSHALL. J. A. Molytorp. Inc. 79/01/32. 10pp. 

790207002B DOCKET 40-8SB4 Union 76 Exploration Co. 

Foruards copies of revised pages to source matl licence 

application for Minerals Exploration Co Bueetuiater Uranium 

project. 

SALISBURY, R. V. Chicago Dridge b Iron Co, 79/01/24. 100pp. 

790214043S DOCKET 40-8602 United Nuclear Corp. 

Responds to 790102 request for maps showing bottom elevation 
on Individual pits for tailings disposal iys. Maps shou 
cross-sections in/minimum 10 ft of compacted backfill t 3 ft 
clay liner. W/10 overalls maps. 
UOCFF.C.E. United Nuclear Corp. 79/01/06. 2pp. 

79022703B9 DOCKET 40-9602 United Nuclear Corp. 

Requests response to two remaining items to enable 
completion of review of proposed tailing dam. Items concern 
proposed riprap gradation fc proposed 6 ft freeboard 
allowance for final height dam, 
SCARANQ.R. A. Fuel Process, fc Fab. Branch. 79/02/01. Ip. 

7902130143 DOCKET 40-B641 Energy Fuels Nuclear 

"Addl Archeological Test Excavations- & Inventory on White 
Meta,8an Juan. County, Southeastern UT. " 
NIEL80N. A. 8. ATCOR. 79/01/31. 200pp. 

7903140012 DOCKET 40-0663 Nuclear Dynamics 

Forwards second quarterly rept. per License Condition 29. 
Copies also being sent to MY Dipt of Environ Quality b NRC 
IbE.Reglon 4 office. 
8TOICK.A. F. Uricli Foundry Co. 79/01/36. Ip. 



7902090031 DOCKET 4O-B200 Cleveland-Cll f f Iron Co. 

Clarifies dotiet numbers for In situ R&D applications as 
requested in 7S1114 Itr. All future submittals re Collins 
Draiu operation should refer to Docket 40-8714. Docket 40-8200 
refers to North Rolling Pin test site. 
CRDH,W.T. Fuel Process, t, Fab. Dranch. 79/01/02. Epp. 



7902H0013 DOCKET 40-B663 Nuclear Dynamics 

Forwards second quarterly rept, originally due 7B1130. 
Provides reasons for delay In ript preparation. Addl 
supportive data to be forwarded as soon as prepared. 
CANNADAY. F. X. Uriel Foundry Co. 79/01/17. Ip. 



DOCKETED ITEMS 



7902140019 DOCKET 4O-8Ai3 Nuclear Dynamics 

"Quarterly Rept, Period Ending NDV 30,1978" for Source Matl 
License BUA-1331. Describes operations during 3 consecutive 
periods: circulation. Injection of Na bicarbonate t> Injection 
of MB, bicarbonate & H peroxide. 
CANNADAY.F. X. Urick Foundry Co. 79/01/17. 129pp. 



7902230191 DOCKET 40-8714 Cleveland Cliff* Iron Co. 

Respond! to request for supportive info re source matl 
license application. Bub ject Include proposed well field 
pattern, shipping distance for gel loiucafce. operating plans 
prop 01 id schadul e, 
8OI1ERV1LLE. K, 0. Desco Marine. 79/O1/16, 355pp. 



7908090417 DOCKET 4Q-8i&3 Nucltar Dyriamlcs 

Inform that second quarterly rapt, due 781130, mill be 
delivered by 790113i since the chief metallurgist fractured 
hit kneecap. some lab equipment failed t weather has been 



poor. 
CANNADAY. F. X. 



Urick Foundry Co. 78/11/30. lp. 



79Q209OO31 DOCKET 40-B714 Cleveland Cliffs Irnn Co. 

Clarifies docSret numbers for in aitu RtD applications as 
requested in 781116 Itr.All future submittals re Collins 
Draui operation should refer to Dociet 40-B714. Docket 40-B200 
refers to North Rolling Pin test site. 
CHOUiW.T. Fuel Process, tc Fab. Branch, 77/O1/03. 2pp. 



7902390488 DOCKET 40-B463 Nuclear Dynamics 

Quarterly rapt for period ending 7B113O for License 
BUA-1331. Activities included circulation Si injection of 
*odium bicarbonate. 
Advisory Council on Historic Preservation. 79/01/17. 15pp, 

7902130141 DOCKET 40-BiBl Energy Fuels Nuclear 

Forward* "Addl Archaeological Test Excavations St Inventory 
on Hhlte Mesa. San Juan County. Southeastern UT, " 
MAD8EN. D. H. Utah, State of. 79/01/31, lp. 

7902070033 DOCKET 40-B6B1 Energy Fuels Nuclear 

Informs that lternativa sites for plant would present a 
larger problem in ((litigation of cultural resources. Site is 
probably not acceptable as an archaeological district. 
KEENEiJ. P. Utah. State of. 79/01/12. 2pp. 



DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES 



7902320119 DOCKET 90-3 Indian Point Station, Unit I 
Informs that TRADOC Pamphlet 390-30, " Interservl CB 
Procedure* for Instructional 8ys Development" referenced 
NUREQ-0219 is available In microfiche form from NRC, 
HE8AU.H.J. Division of Document Control. 79/O1/09. 2pp. 



in 



79022603DO DOCKET 30-3 Indian Point Station. Unit 1 

Submits Endorsement 99 to ANl Policy NF-100, Endorsemont 87 
to HAELU Policy MF-B9, Endorsement 100 to ANl Policy NF-1QO. 
li Endorsements 2 to ANI Binder EB-9, Eu-i ( MAELU Dindors 
XB-9 b X8-i. 
CAH1LL.W. J. Consolidated Edison Co. of New York. 79/03/30. 



7908140431 DOCKET 40-9681 Energy Fuels Nuclear 

Coewents on DEIS (NUflEO-0494): suggests more space could be 
alotted for dlscuision of archaeological impacts b proposed 
itlaatlons of impacts. Notes thare are 49, not 29 sites. 
KEENE.J. B. Utah. State of. 79/01/19. 2pp. 



7902290395 DOCKET 90-3 Indian Point Station, Unit ! 

As followup to NRC 7B1119 request for subjnittal of OPFsite 
Dose Calculation Manual far approvali forwards B"tdeline for 
general contents of manual. 

QRIMEB.B.K. Assistant Director for Engineers !< Prnjeets. 
79/01/19, 5pp. 



7W2270222 DOCKET 4Q-BAB1 Energy Fuels Nuclear 

Report* that DEIS will affect numerous archaeological 

properties that nay be eligible for Inclusion In' Nat 1 

Register of Historic Places. 

HALL.L.B. Advlioru Council on Histor'ic Preservation. 79/01/1 

3pp. 

7903010299 DOCKET 40-B6B1 Energy Fuels Nuclear 

Coiuientf an DEIB (NUREfl-0494): agrees w/staff that mill site 
runoff should be directed Into a retention pond b evaporated 

TAYLDfliK.E.' Health- Education S. Welfare, Dept, of, 79/01/19, 

7W2270B2H DOCKET 40-B6B1 Energy Fuels Nuclear 

Confirm conversation rea.uesting time extension, for EPA 

review of DEIB due to backlog of U milling proposals. Advises 

that draft comments will be in bu, 790220 !> final comments 

later. 

OIEDTiJ. R. Environmental Protection Agency. 79/01/26. lp. 

7902210140 DOCKET 40-B6BI Energy Fuels Nuclear 

Supports const l> operation of U mill because of positive 
impact on joe market in the area. DEIS did not address 
socloeconemlc conditions re need for jobs. Cives Info on 
unenployeiMnt * public assistance figures. 
LYMANiH.J. Utah, State of. 79/OB/02. lp. 

79OE21Q14i DOCKET 40-H681 Energy Fuels Nuclear 

Solicit* support for U nil! project, based on its potential 
for economic boost. States design appears satisfactory for 
pollution fc uaste matl control. 
BLACK.C. Affiliation Uninoun. 79/02/03, 2pp. 



7902210149 DOCKET 4D-B681 Energy Fuels Nuclear 

Supports const of U mill for economic reasons. Expresses 
concern that EPA Is tnterferinn too greatlu. ui/energy 
development. 

. WTDN. Z. Affiliation Unknown. 79/02/04. 2pp. 



2pp. 



77022201B4 DOCKET 40-B6B1 Energy Fuels Nuclear 

Requests approval of U mill project. Believes It would be 

environmentally sound. Opposes tactics of EPA in preventing 

development, 

ACTON, P. B. Affiliation Unknown. 79/02/09. Zpp. 

79022201BB DOCKET 40-B6B1 Energy Fuels Nuclear 

Supports U mill. Believes no 111 effects mould result. Cites 

economic advantage. Believes company has competent 

technology. 

ACTON.P. Affiliation Unknown. 79/02/OB, 3pp. 

790aaaOOBa DOCKET 40-B707 Envlrologlc Systems 

Responds to NRC 790111 request for addl Info re plBns to 
incorporate facility Into commercial-scale solution mining 
facility. Alio discusses proposed testing. 
DIBTEL.B. W. Whirlpool Corp. 79/01/22. 72pp. 



79022600B2 DOCKET SO-3 Indian Point Station, Unit 1 

Requests iddl sum of *BOO. 00 for CUss I duplicate fee far 

amend to Units S fc 3 ETB. 

DIQOS'R.H. License Fee Management Branch. 79/02/03. lp. 

790226060B DOCKET 90-3 Indian Point Station, Unit 1 

Requests addl sum of *BOO fur Class 1 duplicate Fee For 

amend to Units B b 3 ETS. 

DIOQB. R. M, License Fee Management Branch. 79/05/02. lp. 

7902200014 DOCKET 90-3 Indian Point Station, Unit 1 

Submits data specified in Section 401 Certification for Jan 

1977. Concerns gross electrical output, river discharge, 

chemical discharge tc species at fish. 

MONTI, W.A, Consolidated Edison Co. of New York. 79/02/O9. 13pp. 

79022&0233 DOCKET 90-3 Indian Point Station, Unit 1 
Forwards summary of PHR purging & venting experience*. 
SEYFRIT'K.v. Region 4, Dallas, Office of the Director. 74/09/0 
4pp. 

7702210247 DOCKET SO-3 Indian Point Station, Unit 1 

Ack receipt of 7S1115 Itr transmitting Revision 1 of draft 
radiological effluent Tech Specs t NUREO-0133 far use In 
preparing license amend application. Requests extension of 
time for submittal of amend. 
CAHILL,M. Consolidated Ediioti CD. of Keu York. 79/O2/13. lp. . 

7902010292 DOCKET 90-3 Indian Point Station, Unit 1 

Forwards IE Circular 79*02, "Failure of 120 Volt Vital AC 
Pouer Supplies. " 

ORIER.D.H. Region 1. Philadelphia, Office of the Director. 
79/01/16. Bpe, 

7902130032 DOCKET 90-3 Indian Point Station, Unit 1 

Forwards IE Info Notice 79-01, "Bergen-Paterson Hydraulic 
Shock ti Suny Arrestars (HSBAK " 

CRIER, B.H. Region 1, Philadelphia, OfFIce at the Director. 
79/02/02, 2pp. 

7902290478 DOCKET 90-3 Indian Point Station, Unit 1 

Forwards IE Bullttln 79-01, "Environ Qualification of Class 
IE Equipment." M/list of 11 systematic (valuation program 
plants for which no action is required. 

CRIER, B.H. Region 1, Philadelphia, OfFIce of the Director. 
79/02/OB. 2pp. 

7902230122 DOCKET 90-3 Indian Point Station. Unit 1 

Forwards tabulation of dally record of fleh collections Far 

Jan 1979. 

CAHILL,U.J, Consolidated Edison Co. of New Yor*. 79/02/13. 4nf. 

79021401SQ DOCKET SO-3 Indian Point Station. Unit I 
Forwards LER 79-002/04 T-0. 
CAHILL,H.J. Commanuiealth Edison Co. 79/02/06. lp. 



DOCKETED ITEMS 



7902110192 DOCKET 50-3 Indian Point Station. Unit 1 
LED 79-OO2/01T-0 on 790108: reported activity of 
precipitation sample e.ceeded 10 times control station 
leve-1. Caused bg tritium releases from source o 
plant. 
MASCIULLI.B. CommonuiBalth Ed i 



than 



Co. 79/00/06. 3pp. 



7902220095 DOCKET 50-3 Indian Point Station. 
Forwards LER 7B-03B/04X-I. 
CflHILL-W.J. Consolidated Edison Co. of Ni 



Unit 1 
a fort. 79/02/14. lp. 



3pp. 



790233009B DOCKET 30-3 Indian Point Station. Unit 1 _,_,,. 

LEO 7B-03S/04X-1 on 761312: proc ip itation sample e.ceeded 10 
times control station 1 evel. Caused by trl tium releases from 
source c-utside facility. NV State Dept of Environ 
Conservation investigating area manufacturer ,o/nn/i4 

HASCIULLLS. Consolidated Edisnn Co. ofNeiuVork. 79/02/14. 

7902060306 DOCKET BO-5 Pennsylvania Stata Univ. Research Reactor 
Details minor chanoas (. related nafaty evaluation made to 
facility during 197B. Aluminum pneumatic ays Installed on 
7BOI16 & atainlffls steel pnaumatic transfer sys inatallad on 

7B0213. 

CUNNINGHAM. B. G. Pennsylvania State Univ. 79/01/29. 3pp. 

7902230119 DOCKET 50-10 Dresden Nuclear Power Station. Unit 1 
Inform* that TRADOC Pamphlet 330-30. " Interservice 
Procedures for Instructional Sys Development" referenced in 
NUF1EG-0219 la available In microfiche form from NRC. 
BE8AU.H.J. Division of Document Control. 79/01/09, 2pp. 

7902200013 DOCKET 30-10 Dresden Nuclear Power Station. Unit 1 
Forwards interim security plan for facilities describing 
compensatory muaiureB to be implemented on 790223. End 
withheld Iref 10CFH2. 790). 
REED,C. Commonwealth Edison Co. 79/02/02. lp. 

7902280265 DOCKET 50-1O Brendan Nuclear PouiBr Station, Unit 1 
Forwards Revision 4 tp modified amended security plan for 
Dresden t. Quad Cities fc Revision 3 to modified amended 
security plan for Zion.Entl withheld (ref 10CFRH.790). 
LEE.D. Commonwealth Edison Co. 79/02/20. tp. 

7902230196 DOCKET 50-1O Dresden Nuclear Pouier Station, Unit I 
Forwards 197Q Annual Rept for utll, 
BRESEWftNN. R. W, Commonwealth Edison Co, 77/02/13. lp. 



79032301?'! DOCKET 50-10 Dresden Nuclear Power Station, 
197B Annual Rept. Rnviews 197B, f ive gear summary of 
operations fc mgt. k finanical statement, 
Commonwealth Edison Co. 7B/13/31. 24pp. 



7903210339 DOCKET 30-10 Dresden Nuclear Power Station, Unit 1 
Forwards Endorsement 2 to Binders EE-i, XG-I , EB.-a, XD-2, ED-3, 
XB-3, EB-29 J XB-29,EB-30,XB-30, EB-ia, XD-42, EG-43, XB-43, 
evidencing secondary financial protection. 
DBTER.J. Commonwealth Edison Co. 79/02/14, 19pp. 



790B2I0340 DOCKET 30-1O Dresden Nuclear Power Station, Unit 1 
Formar-ds Amend, US to Indemnity Agreement NF-43, Amend 97 to 
MKF-aS.flmcnd 36 to NF-187, Amend 47 to MF-34. Amend IS to 
NF-BOli Amind 39 to MF-64. 6 Amend B to NF-253 for calendar 
Dear 1179. 
OSTERiJ. Commonwealth Edison Co. 79/02/14, Bpp. 

7902260G3S DOCKET 50-10 Dresden Nuclear Power Station, Unit 1 
Forwards Info on BUR venting practices, 

DANCE, H.C. Region 3, Chicago, Office of the Director, 7S/03/09, 

5pp. 

7902060293 DOCKET 80-1O Dresden Nuclear Power Station, Unit 1 
Meeting ui/util on 790123 to discuss open items needing 
resolution before unit returns to svc has been cancelled. 
O'CONNOR, P. H. Operating Reactor* Branch 2. 79/01/09. 2pp. 

7902210115 DOCKET 30-1O Dresden Nuclear Power Station, Unit 1 
Act receipt of 78121B Itr informing NRC of steps taken to 
correct violation* noted during Insp on 781010-13 b 14-19. 
HIND, J. A, Region 3. Chicago, Safeguards Branch. 79/01/26, lp. 



7902140293 DOCKET 50-10 Dresden Nuclear Power Station, Unit 1 
Discusses three programs that evaluate results of chemical 
cleaning: component insp program, metal surveillance program a 
radiation levl determination. 
BTEPHENBON, B. B, Commonwealth Edison Co. 78/U/2B. 2Opp, 

7902140255 DOCKET 50-10 Dresden Nuclear Paver Station, Unit 1 
"Dresden 1 Radiation Level Reduction Program, Intergranular 
Corrosion Testa of Sensitiied Type-304 Stainless Steel in 
Dow NS-1, Stress Corrosion Cracking Tests of Type 304 
Stainless Steel & Carbon & Lou Alloy Steals. " 
WALKER, U. L. peneral Electric Co. NEDC-24143. 70/09/30. 40pp. 

7903110337 DOCKET 50-iO Dresden Nuclear Power Station, Unit 1 
"Final Rent on Suppl Metallurgical Studies for Chemical 
Cleaning of Dresden 1," Discusses corrosion tests in Dow 
solvent NS-1 fe effectiveness & corrosion effects of USD of 
Dow dilute copper rinse during chemical cleaning. 
* Te.as Instruments, Inc. DN8-D1-029. 79/01/24. 74pp. 

79O2140262 DOCKET 50-10 Dresden Nuclear Poiuer Station, Unit 1 
"Radiation Let/el Program Corrosion Tests, Progress Wept for 
Oct 197B. ' Loha term evaluation of sffectB of exposure ta 
Dow NS-1 solvent on stress corrosion cracking of sansitiied 
Tupe 304 stainless steel In simulated BWR environ. 
WALKER, H. L. General Electric Co, 73-509-139. 78/10/31. 33pp. 

7902140264 DOCKET 30-1O Dresden Nuclear Power Station, Unit 1 
"Radiation Level Program Corrosion Tetta. Progress Rept for 
Aug 1977." Fracturs mechanics tests o# simulated clad cracks 
in ABTM A334 Or Fl mpOBod to Doui NB-l denning solvent. 
WrtUKEfl.W.L, General Electrit Co. 77-309-70. 77/OB/OB. 19pp. 

7902140267 DOCKET 50-10 Dresden Nuclear Power Station, Unit 1 
"Radiation Level Program Corrosion Testa. Prograa* Rept for 
Dec 1977." Frocture mechanics tests of simulated clad cracks 
in ABTM A333-Pli A302-B. A106-3 Si A105 Blposed to Dow NS-1 
cleaning solvant. 
UALKEfi.W. L. Beneral Electric Co, 70-309-002. 7B/01/03. 22pp. 

7902140269 DOCKET SQ-10 Dresden Nuclear Power Station, Unit 1 
"Raolation Level Program Corrosion Tests, Progres Rept for 
Apr 197B. " Fracture mechanics tests of simulated clad cracks 
in addl ImatB of ASTM A33S-P1 , A302-D, A104.-B b A103 exposed 
to Dow NS-1 cleaning solvent. 
H/lLKER,W. L. General Electric Co. 7B-509-d6, 7B/04/2B. 41pp. 

7902140271 DQCKET BO-10 Dresden Nuclear Power Station, Unit 1 
"Radiation Levol Reduction Program, Evaluation nf Long Term 
Tests of Simulated Clad-Cracked Specimens. " 
WALKER, W. L. General Electric Co. 509-ATH-17. 7B/1H/OA. 7pp. 

7902140203 DOCKET 30-10 Dresden Nuclear Power Station, Unit 1 
Informs of decision not to convert to std Tech Specs. 
Conversion would b a significant tine & manpower burden 
in/no compensating increase in safety or efficiency. 
REED.C. Commanuoalth Edison Co. 79/02/OB. Epp, 

7902150353 DOCKET 50-10 Dresden Nuclear Power Station, Unit 1 
Repts status of HPC I su,s. Most structural work on HPCI bldo 
finished excapt for minor itnm, OE is currently working on 
thermal shoe* analyiii i Enon Is progressing on App K 
analysis. 
JANECEK.R.F. Commonwealth Edison Co. 79/02/09. Hpp. 

7903260S07 DOCKET 30-10 DrinJen Nuclear Pouier Station, Unit 1 
Forwards draft evaluation of systematic evaluation program 
Topics V-10, D, v-11. B & Vtl-3 re safe shutdown sys. Requests 
confirmation or correction of fact* within 30 days. 
ZIEMANN.D.L, Operating Reactors Branch 3. 79/02/09. 100pp. 

7908240431 DOCKET 30-10 Dresden Nuclear Power Station, Unit 1 
Request* change In License* DPR-2, DPR-19 It DPR-23. Forwards 
proposed changes'. Of fs i te Dose Calculation Manual required by 
NRC 7B1118 Itr b discussion of principal differences from 
NRC guideline* for manual development. 
REED.C. Commonuioal th Edison Co. 79/02/16. 40pp. 

790226044S DOCKET 30-10 Dresden Nuclear Power Station, Unit 1 
Offslt* Dose Calculation Manual for Dresden Station. 
Commonwtfllth Edison Co. 79/OH/BB. 16Opp. 



7902120206 DOCKET 30-10 Dresden Nuclear Pouier Station, Unit 1 
Responds to NRC 7BIE21 request for verification of Info ro 
systematic evaluation program Topic V-11. A, "Requirements 
for Isolation of High & Low Pressure Systems." Provide) info 
requested. 
JANECEK.R.F. Commonweal th Edison Co, 79/03/03, 4pp. 

7902140230 DOCKET 50-10 Dresden Nuclear Power Station, Unit 1 
Forwards addl info re chemical cleaning In response to NRC 
7S0502 request, 
JANECEK.R.F. Commomweal th Edison Co, 79/OH/03. 3pp. 



7902260010 DOCKET 50-1O Dresden Nuclear Poiuer Station, Unit 1 
Forwards IE Insp Repts 30-01O/7B-32, SO-B37/7B-30 & 
SO-349/7B-30 on 781031-1103 & 1129. 

DAVIS.A.D- Region 3, Chicago, Fuel Facility fc Materials Safety 

Branch. 79/01/10. 2pp. 

7902260012 DOCKET SD-10 Drden Nuclear Power Station, Unit 1 
IE Insp liepts SO-010/7B-32, 50-237/7B-30 h BQ-249/7B-30 on 
7B103I-1I03 & 1IH9. No Items of noncompllance nntd. Major 
areas lnp:mgt controls, environ protection proorams (> 
Internal audits.. 

OE9TMAN, M, J. , JANUBKA, A. 0. - GRANT, U, B. Region 3, Chicago, Fuel 

Facility t Materials Safety Branch. 79/01/OS. 9pp. 



DOCKETED ITEMS 



79033*0090 DOCKET 90-10 Dre*den Nuclear Pouir Station, Unit 1 
Forward* IE In*p Ript 80-010/78-33.30-337/79-31 & 
3C-24?/7B~31 on 7B1101-1SO1 fc notice at violation. 

FIOREU.1,0. Region 3. Chicago, Reactor Operations Nuclear Support 
Branch. 79/01/13. 2pp. 



7903230173 DOCKET 30-13 Babcock t. Wllco. Co. Critical Facility 
Responds to 790302 Itr. Provides details of amnunts i. 
enrichments oft SNM. Ajrcea to add license condition requiring 
nod of reactor security plan. Claimi no eiemptions for any 

OLSEN.A.F. Babcock t Wilcai Co. 79/02/16. 3pp. 



7902260034 DOCKET 50-10 Dresden Nyclear Pouer Station, Unit 1 
Notice of violation from inap on 7B1 101-7B1201 . 

* Region 3. Chicago, Reactor Operations Nuclear Support Branch. 
79/01/09. lp. 



7902030133 DOCKET 30-1B Vallecitos [toiling Water Reactor 
Forwards copies of Endorsement 107 ta AMI Policy NF-i i. 
Endorsement 17 to MfiELU Policy HF-95. 
CORREA, C. Marsh t. McLennan. Inc. 79/01/29. 3pp. 



79Q22iOQ6i DOCKET SO-1O Dresden Nuclear Power Station, Unit 1 
IE Insp Repts 50-010/78-33. 80-237/78-31 t. 5O-249/7B-31 on 
7B1101-1201. Noncompliance noted ; fai lure to follow temporary 
procedure change & failure to perform a surveillance. 
KNOP.R.C., DARKER. J. L. , SMITH, J. ReoionS, Chicago, Office of 
the Director. 79/01/O9. 15pp. 

7902330131 DOCKET 30-10 Dresden Nuclear Power Station, Unit 1 
Ack rece'ipt of 790117 Itr Informing NRC of steps taken to 
correct violation! noted in IE Insp Repts 30-10/7G-31, 
30-237/7B-29 fc 80-249/78-39. 

DAVIB.A. B. Reoion 3, Chicago. . Fuel Facility (. Materials Safety 
Branch. 79/01/31. lp. 

7902230134 DOCKET 30-10 Dresden Nucloar Power Station, Unit 1 
RetDonds to NRC 790103 Itr ro violation noted In IE Insp 
Reptt 30-10/78-31,30-237/78-29 (c 30-249/78-29 on 781115-17, 
21-22. Corrective actionsinew procedures reviewed h 
reemphaiiied. 
REED, C. Commonwealth Edison Co. 79/01/17. 3pp. 

7902120034 DOCKET 80-10 Dresden Nuclear Power Station. Unit 1 
Forward* IE Info Notice 79-01. "Bergen-Paterson Hydraulic 
Shock h Sway Arresters (HB8A)", toimin-i 

KEPPLER.J.Q Reoion 3, Chicano, Office of the Director. 79/02/02. 

4pp. 

7902120034 DOCKET 30-10 Drden Nuclear Pouier Bta.tion, Unit 1 
Forwards IE Info Notice 79-01, "Brrgen-Paterson Hydraulic 

'S* *":!' ic'ago. Office of ,h. Director. 79/02/02. 



-,,,/nD/no 

79/02/09. 



7902210220 DOCKET 30-10 Dresden Nuclear Power Station. Unit 1 
Forwards IE Bulletin 79-01, "Environ Qualification of Clasa 
IE Eq.ulpant. " W/lit of 11 systematic evaluation program 
plants for which no action in required, 
KEPPLER.J.O. Reflion 3, Chicago, Office of th. Director. 

lp. 



7902270282 DOCKET 30-10 Dresden Nuclear Power Station, Unit 1 
Forwards IE Info Notice 79-03, "Limi torque Valve Oeared 

'''c' 1 LUb R"e fl "n'3. Chicago, Office of the Director. 79/02/09. 



7902260420 DOCKET 30-1B vallecltos Boiling Wator Reactor 
Forwards Annual Rept 14 for deactivated facility includins 
Btatu* of facility, periodic insp. radiation !. contaminat ion. 
CUNNINGHAM, 0. E. General Electric Co. .Nuclear Energy Products Div. 
79/02/Ofa. lp. 

7902360424 DOCKET 90-18 Vallecitos Boiling Water Reactor 

Annual Rapt 14 describes routine Insp & results of rfldiatinn 
t, contamination surveys. ,.,,-,, 

* General Electric Co. , Nuclear Energy Products Div. 70/12/31. 

-.pp. 

7902230149 DOCKET SO-27 Washington State Univ. Research Reactor 
Provides info ri projected SUM requirements d associated 
categories for License R-76. Idsnti f lea deflree of enrichment 
of U-233. Suggests mod of Tech Specs to be consistent with 
current practice. ,, 

WILSON, W. E. Washington State Untv. 79/O2/13. 2pp. 

7902150217 DOCKET 30-37 Washington State Univ. Research Reactor 
Forwards IE Insp Rpt 30-27/7B-03 on 781SlB-aO. No 

CREUsTj. L* Reoion 3, San Francisco, Reactor Operations Nuclear 
Support Branch. 79/01/10. 2pp. 

7902150230 DOCKET 30-27 Washington State Univ. Research Reactor 
IE Insp fiept SO-27/7B-03 on 701318-20. ND noncompliance 
noted Areas inspected: organ! ration, logs (. racords, review t 
audit, requalification training, procedures, surveillance !< 

JOHNBTONVij. . JOHNSON.A.D. fiaglon B, San Francisco, Reactor 
Operations Nuclear Support Branch. 79/01/09. 3pp. 

7902220119 DOCKET 50-39 Yankee-Roue Nuclear Power Station 
Informs that TRADOC Pamphlet 330-30, "Interservice 
Procedures for Instructional Sys Development" referenced in 
NUHEO-0219 is available in microfiche form from NHC. 
BEBAW, W. J. Division of Document Control. 79/01/09. 3pp. 

790B260098 DOCKET 30-29 Yankee-Roue Nuclear Power Station 
Amended security plan has been reviewed t d t c '"'" ... 
are discussed In Encl A.uhich is ulthheld Iref 10CFR2. 790). 
Addl commitments in Encl A should be incorpnrated Into plan. 
ZIEMANN.D. L. Operating Reactor* Branch 2. 79/01/24. 3pp. 



7902270232 DOCKET 80-10 Dresden Nuclear Power Station, Unit 1 
Forward! IE Info Notiea 79-03, "Llmltorque Valve Seared 

SKS$ LUb R.gt"n'3, Chicago, Office of th. Director. 79/02/09. 
IP- 

7903220083 DOCKET BO-10 Dresden Nuclear Power Station, Unit 1 
Foruardt monthly operating .rapt for Jan l<?7 ,9, 
BTEPHENBQN, B. B Commonweal th Edison Co. 79/O2/13. lp. 

79022200B4 DOCKET 50-10 Dresden Nuclear Power Station. Unit 1 
Monthly operating rept for Jan 1979. _,.,,_, , 0nn 
PHELAN. J.F. Commonwealth Edison Co, 79/01/31. 18pp. 

7902140340 DOCKET 30-13 Dabcock b Wilcox Co. Critical Facility 
Forward* corracted transmittal Itr t. amend to License CX-10 
dtd 7B11S9. Original Itr fc amend show incorrect equivalent 
weight for 3 Ci of Am, Corrected amend should be substituted 

REIDiR.H. Operating Reactor* Branch 4. 79/01/24. 2pp. 

790214034B DOCKET 50-13 Babcoek t. Hilco< Co. Critical Facility 
Forird Anund 10 to License CX-10 in response to 7B062A 
rtutit. Amend permits substitution of Am-Be neutron sources 
for Fu-Be neutron sources fc permits authorirfltion to receive 
aoi*i* fc ute up to 3 Cl <1,34Q g) of Am, ,.,, 
REID.R.H. Operating Reactors Branch 4. 78/11/29. 2pp. 

7903140334 DOCKET 30-13 Babcoek tc Uilco< Co. Critical Facility 
Attend 10 to License CX-10 authoriiinfl possession 
l> use of up to 373 kg of contained U-233 fc up to 

REIDiftlV 'operatino Reactors Branch 4. 79/11/29. 2pp. 



7902130439 DOCKET 80-29 Yankee-Roue Nuclear Pouer Station 
Reouests addl Info fire protection guidelines, control, 
responsibilities, t, QA.W/encl questionnaire t. NRC positions 

ZIEMANN, D, L. Operating Reactors Branch 2. 79/01/23. 6pp. 

7902120194 DOCKET 30-29 Yankee-Roue Nuclear Power Station 
Foruard* fire hazards analysis uhich discusses safe plant 
shutdown d cooldown capability in event of fire. Responds to 
NRC 781230 Itr requesting addl info on shutdown capability. 
MOODY. D. E. Yankee Atomic Electric Co. 79/03/03. 9pp. 

7902BB03B2 DOCKET 30-29 Yankee-Roue Nuclear Pouer Station 
Foruardi propo*ed actions re outstanding fire protection 
issues: investloation will determine means of detecting fires. 
in containment i. 12 addl portable eitingulshors ulll be 
provided in containment. 
MOODY, D. E, Yankee Atomic Electric Co. 79/02/32. lp. 



7902360233 DOCKET 30-29 Yankee-Rowe Nuclear Power Btation 
Foruards summary of PWR pursing ti venting eiperiences. 
SEYFRIT.K.V. Region 4. Dallas, Office of the Director. 
4pp. 



74/09/03, 



7902010289 DOCKET 30-29 Yankee-Roue Nuclear Power Station 
Forwards draft evaluation of systematic evaluation program 
for RHH sys hiat exchnoer tube failures. Host primary 
protection sys criteria have been met, but action should be 
initiated rn environ protection. 
ZIEMANN,D.L. Operating Reactors Branch 2. 79/01/17. 3po. 

7902280533 DOCKET 50-29 Yankee-Howe Nuclear Pouer Station 
Submits backaround info re application for license amend to 
permit operation In idle loop mode*. Reactor trippee 76011J fc 
application for amend In event defective pump could not b 
replaced on time. Application withdrawn. 
BURCER.A, Operating Reactors Branch 2. 79/01/24. lp. 



6 



DOCKETED ITEMS 



79O2330Q7B DOCKET 50-29 Yankee-Howe Nuclear Power Station 
Forward draft evaluation of usteraatic evaluation program 
Topic 11-2. DJ "Availability af Meteorological Data In 
Control Room. " Requests response uiitMn 30 dagi. 
ZIEMANN.D. L. Operating Reactors Branch S. 79/O2/01, 4pp. 



7902060234 DOCKET 50-29 Yanfcoe-nauie Nuclear Pouer Station 
LER 79-001/03L-O on 790103; during normal operation, f I lt*r 
alarm on containment main coolant SUB leakage air 
participate monitor was received. Caused by running out a* 
vlctoreen tgpe HV-7O Part B41-1-164 filter paper. 
noUTWELL, R. L. Yanfcee Atomic Electric Co. 79/03/OH, Ip. 



79Q2230O79 DOCKET 30-29 Yan fcee-RoidB Nuclear Pouor Station 

Forward* redraft evaluation of systematic Evaluation program 
Topic IV-l.Aj "Operation U/Lesi Than All Loop a in Svc. " 
Requests response uilthin 3O dags. 
ZIEttANN.D. U. Operating Reactors Branch 2. 79/02/01. by p . 

7902120071 DOCKET 30-27 Yankee-Roue Nuclear Power Station 

Forwards nod to Appendli tt of 1 1 cense- Proposed Change 193 re 
crane traval & spent fuel pi t. Support ing doc (mentation end. 
VANBENBUROH. D. E. Yanfcee Atomic Electric Co. 79/03/07. 57pp. 

79Q215O3BB DOCKET 50-29 Yan koe-fiaiHB Nuclear Power Station 
Responds to 770926 request For evaluation of boron dilution 
ace I dents possibly resulting From ran* t limiting i ingle 
Failure or operator error. No addl boron dilution svant 
possible. 
OROCE.R.H. Yankee Atomic Electric Co. 79/O2/I2, tp. 

79QS1904OB DOCKET 30-29 Yan kee-Raue Nuclear Power Station 
Documents info presenteri to NRC at 761230 meeting u/uli 1 t, 
Systematic. Evaluation Program Branch re seismic evaluation. 
Delineates basic program plan c omponents. Development cat) 
proceed no Further w/o NRC seismic input data, 
QRDCE.R.H. Yankee Atomic Electric CD. 79/02/13. 2pp. 



7903SA0293 DOCKET 50-29 Yankee-Roue Nutlaar Pouer Station 
Forwards correction* to NRC evaluation of systematic 
evaluation program Topic V-10. A, 
OROCE.R.H. Yankee Atomic Electric Co. 79/O2/13. 2pp. 



7902230022 DOCKET 50-29 Yankee-fiauK Nuclear Pouar Station 

Forwards revised tabulation sheets for environ qualification 
af lafetg-rel-a ted electrical equipment re systematic 
evaluation pro-gram. Changes imp 1 B-mentcd during recant 
refueling shutdown. when level instrumentation was replaced. 
QROCE.R-H. Yankee Atomic Electric Co. 79/03/14. 7pp. 

7702270311 DOCKET SO-29 Yankee-Roue Nuclear Pguer Station 
Respond* to NRC 790123 Itr ui/flddl info an administrative 
controls. 
MOODY, D. E. Yankee Atomic Electric Co. 79/OS/23. 3pp. 

7902090129 DOCKET 50-29 Yankee-Roue Nuclear Pflwer Station 
Forwards IE Insp Rept 50-OB9/7B-22 on 73t20i-07. Wo 
none amp 1 iance noted. 

CARLSON. R. T. Region 1. Philadelphia, Reactor Construction & 

Engineering Support Drench. 7B/12/36. 3pp. 

7903090140 DOCKET 50-39 Yankee-Roue Nuclear Pouier Station 
IE Insp Rept 5O-Q29/7B-22 on 7B1S06-07, No noncomp lianc e 
noted. Major areas inspected: Inaervlce examination 
ac tlvi tiesjinod af poat-LOCA TBC irculatf on sijs t eddg current 
e i amir it inn af steam genarat-or tubes. 

SANDERSj W. F. . EDNETER.S. Region 1, Philadelphia, Reactor 

Construction t Engineering Support Branch, 7B/12/20, 3pp. 



79O2O10376 DOCKET 50-29 Yankee-Roue Nuclear Power Station 
FoTuiards IE Circular 79-08, "Failure of 120 Volt Vital AC 
P ouer Suppl Us, " 

GRlEfl.n.H. Region 1- Philadelphia. Office of th* Director. 

79^01/16. Bpp. 

7902130020' DOCKET 50-S9 Yankee-Roue Nuclear Power Station 
Forwards IE Info Notice 79-01 . "Bergen-Paterson Hydraulic 
Shnck & Suiaij Arrestors (HS3A>," 

ORIER.B.H. Region 1, Philadelphia. Office of the Director. 

79/O2/O2. Ip. 

7902360808 DOCKET SO-29 Van kee-Rouit Nuclear Power Station 
Forward! IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment," W/list of 11 Bijitnmatic evaluation program 
plant* For which no action is required. 

ORIER.D.H, Region 1, Philadelphia. OFfica of the Director. 

79/02/03. IP. 



7902200047 DOCKET 90-29 Yankee-Roue Nuclear Pouer Station 
ForliJarlJ* monthly operHtinn rpt For Jan 1979, 
MOODV.D.E. Yankee Atomic Electric Co. 79/03/12. ip. 



790220004B DOCKET 90-27 Yankee-Roue Nuclear Power Statinn 
Monthly operating rept Por Oan 1979. 
SJOOHEN.R.M. Yankee Atomic Electric Co. 79/02/13. 4pp. 



79O2O60S30 DOCKET SO-29 Ydnkee-Rawe NucUar Power Station 
Forward* LER 79-001 /03L-0'. 

. A, Yan*e Atomic Electric Co. 79/O2/D2. Ip, . 



790237O24Q DOCKET 3O-29 YankBH-Rouie Nuclear Power Station 
ForuariJfi LER 79-OO3/03L-0. 
AUT1D,H. A. Yankee Atomic Electric Co. 79/02/21. Ip, 

7902270243 DOCKET 50-29 Yankee-Roue Nuclear Pouier Station 

LER 79-OO3/03L-O on 790113: during unscheduled ihutdoum Ittan 
generator chloride concentration eaceeded 0.3 ppm Tech Oft 
limit. Caused by steam generator's chemical hideout. 
DOUTWELL, F?. L. Yankee Atomic Electric Co. 79/02/B1, Ip. 

7902270273 DOCKET 30-29 Yatiliee-RouiB Nuclear Pouer Station 
Foruards LER 77-OOS/03L-0, 
AuriD,H. A. Yankee Atomic Electric Co. 79/03/21. Ip. 

7902270276 DOCKET SO-29 Yankee-Roue Nuclear Pouer Station 
LER 79-OOS/Q3L-O on 790122: fol louiing plant trip, control roe* 
operator Found Rod 22 failed to drop into core from 07 
Inches on the> scram tt all rods in svoup uere not within 
plm/minuB B Inches. Caused by crud buildup after repuellnj 
MAY.E.L, Yankee Atomic Electric Co. 79/02/21. ip. 

79O227Q3fcS DOCKET 30-29 Yonfcee-Rouie Nuclear Power Station 
RO 50-029/79-0";. on 79O219:leok Found in fire suppress ion 
maker sys betuaan valves FS-V-i41, FS-V-i42 fc FS-Y-617, Couit 
untnouin. 
AUTIO.H.A. Yankee Atomic Electric Co. 79/02/21. 2pn. 

790226O4B2 DOCKET SO-30 Plum Brook Research Reactor Facility 
Forwards "Rept of Reactor Standby Condition for NftGA Plum 
Brook Reactor" for 1970, 
DIDELOT, n. C. , DEY, U. National Aeronautics & Space Admin, 79' 



7902260439 DOCKET 50-30 Plum Brook Research Reactor Facility 
"Rept of Reactor Standby Condition For NASA Plum Brook 
Reactor. " Annual rapt For 197B. 
National Aeronautics & Space Admin. 79/02/17. 6pp. 

77022BO301 DOCKET 50-34 Pauling Research Reactor 

Requests immediate^ Tech Bpec change to License R-B1 to 
Increase production of U-233, due to recent slowdown in 
Canadian production uhich threatened shortage to U9 madlo-l 
supp lien. 
MCQQVERN, J. J. Union Carbide Corp. 79/02/21. Ip. 



7902320244 DOCKET SO-63 Univ. of Virginia Research Reactor 
Forwards IE Insp Repts 50-062/78-03 d 50-39i/7fl-02 on 
781128-30 & notice of violation. 

LONSpF. J. Region 2< Atlantai Reactor Operations Nucltr ITune.i 

Branch. 7S/1S/1Q. 2pp. 

790222024i DOCKET 30-62 Univ. of Virginia Research Ralop 
Wotic of violation from inap on 701129-30. 

LONG. F, J. Region S< Atlanta, Reactor Operation* NutlrBwi 

Branch. 78/1H/1B. Ip. 

79 02 a 203 &O DOCKET 90-62 Univ. of Virginia Retearch Raactc-r 
IE Insp Repts 3O-Ofe3/7B-03 b 30-396/78-02 on 781130-30. 
HoncompllancB natetf: Reactor Safety Committee approved 
procedure ^Bvislon resulting in reactor operating fr-on 
7B 1033-1.133 ui/tcram sultch inoperable. 

LEWIS, n,C. Region 2, Atlanta, Reactor Operotion* HuetHf 

Support Branch. 7B/12/18. Spp. 

790HB7Oiai DOCKET ao-62 Univ. of Virginia Research fleact-nr 
Forwards IE Insp Repti 50-062/7S-01 (< 00-39i/7B-03 on 
7B.122B-B9. No noncampl iance noted. 
KENNA, W. ff. Regions. Atlanta. Safeguards Branch. TffQl/l* I 

7902370126 DOCKET SO-6E Univ. of Virginia Research Reactor 
IE Imp Rpt 30-062/78-04 tt 50-39i/7B-03 on 7aiSSQ~Z9. Hi 
tianccmpliancB noted. Major area Inspected: physical lecurtt^ 
progran. 

BEBECKER.K. H. , QILLESP1E, F. P. Region 2, Atlanta. Blfl|Ur<i 

Branch. 79/01/11. 3pp. 

790B1S017B DOCKET 30-7O Qeneral Electric Tt Reactor 

Forward* 761212 joint Itr from three individuals e*preiln| 

views re OETR. Ltr it written limited appearance statement 

per 10CFRS. 713. 

CHANDLER, L. -J. Office of the E>ecutlve Legal Director. 

Ip. 



DOCKETED ITEMS 



77021301B9 DOCKET 30-70 General Electric Test Reactor 

Urges ihutdoun of facility dus to nearby earthquake fault, 
toileity ot Pu oxide b'24iOOO gear half-life of Pu. Requests 
due coniderat Ion of inherent danger* involved in nuclear 
energy. 
, JOHNSON, D,- WEBER, C., HART, S, Affl 1 iation Unlnoun. 78/12/li 



7902230249 DOCKET 90-70 General Electric Test Reactor 

Intervenor Friend* at the Eartli'* reponse to ASLB 790119 
order. Request* referral of OE 7B0626 1 nterrojatory 1 a/ all 
respan*es to NRC. Certificate of Svc encl. 
BALDWIN, W. A. Friends of the Earth. 77/01/55. 2pp. 

7902030093 DOCKET 50-70 General Electric Tet Reactor 

Dismisses Intervenors' 790123 (notion requesting referral 

of BE Interrogatory 1 & associated papers- 

LUTONiE. Atomic Safety and Lic*n*lng Board Panel. 77701/39. lp. 

7902230167 DOCKET 90-70 Central Electric Test Reactor 
Repts investigation finding* r excessive leakage fate. 
Found laak source at containment ventilation sya exhaust 
duct isolation valves. Performed satisfactory ad juitmenti ulll 
make further adjutment during next retest Interval. 
DARMlTZELiR. U. General Electric Co. .Nuclear Energy Products Div. 
79/02/12. Spp. 

7902210078 DOCKET 80-93 Univ. of Florida Training Reactor 
Forward* IE Insp Rept 30-083/7B-0& on 7B1E03. 
No noncompliance noted. 

SUTHERLAND, J. T. Region S, Atlanta, Fuel Facility lc Materials 

Safety Branch. 78/12/26. Spp. 

7902210102 DOCKET 9O-83 Univ. of Florida Training Reactor 
IE Insp Rept 90-083/78-06 an 7B1B09. No none amp 1 lance noted, 
Major area inspec ted; emergency drill observation. 

HUFHAM.J.W. Region 2, Atlanta, Fuel Facility fc Materials Safety 

Branch. 7B/L2/S6. 4pp. 

7902010396 DOCKET SO-B7 Westlnghouse -Critical Experiment 
Forwards IE Imp Rept SO-OB7/7B-07 on 781,227-29, No 
noneompllanee noted. 
HIND, J. A. Region 3, Chicago, Safeguards Branch. 79/01/22. Spp. 



79020SU203 DOCKET 50-99 Babcock t, Wile ox Tost Reactor 

Responds to NRC 7BQB21 1 tr. Forwards Info re financial data, 
business conduc tedi organizational structure, radiological 
mon J toring, sa f ety haiartfB & Tech Specs. 
OLSEN, A. F. Bad cock {iWiltoi Cn. 79/O1/37. 7pp. 

7905090509 DOCKET 5O-99 Babcock !. Wilcoi Test Reactor 

Annual rept for fiscal year ending 780331. Forwards fact book 
S< SEC form 10-K ai suppl. 

* J. Rag McDermott i. Co. 7B/O3/31. 199pp. 

7903090212 DOCKET 50-99 Dab cock t. Wilcox Test Reactor 
App A to Tech Specs for Liceni* R-47. Dl scuises safety 
limit BJ limiting conditions for operation, survel 1 lance 
requirement's, dm 1 gn features & adminlltrative control*. 

* Babeock tc Wilcox Co. 70/12/31. 44pp. 

7902030216 DOCKET 90-99 Babcnck fc Wilcoi Test Reactor 
Safety haiarda evaluation repti update for License R-47. 
Diicus-ses Bite locating Ct descrlpt ion, operati on, reactor 
accidents & maint commitmsnt. 
Dabcock t Uilco Co. UAU-74, 73/11/30. 27pp. 

790223O173 DOCKET 50-99 Babcock tc Milcox Test Reactor 
Respondti to 7903Q2 Itr. Prov i de> datolll ot amount* b 
enrichments of BNM. Agreei t-a add license condition requiring 
mod of reactor eeurlty plan, Claims nc. eimptldnt for any 
SNH. 
QLSEN, A. F. Dabcock EiHltcoi Co. 79/O2/1A. Spp. 

79OB09O339 DOCKET 50-106 Oregon Btatu Univ. Research Reactor 
Foruiard* application for const permit & license to operate 
nodal AON-SD1 nuclear training reactor-. Requests expeditious 
treatment of application, as reactor currentlv In OR tc must 
be radg far training claisei bv Fall 1779. 
DAVIS, M. C. Morthuesitarn Univ. 79/O1/26. lp. 

7903090360 DOCKET SO-lOfr Oregon State Univ. Research Roactor 
"Nuclear Training Reactor Clats 1O4 Operating License fc 
Const Permit Application" for model AON-SOli srrial 114. 
Includes Financial considerations' SARi operator license's & 
rvqualif Icatlon tralnlngi physical security b Fuel shipment. 
DAvIB, M. C. , VAN MODRDENNEM Ncrthuie stem Univ. 78/07/30. S9Dpp. 



7902010368 DOCKET SQ-87 Wntinghouit Critical Experiment 
IE Imp Rept 90-OB7/7B-07 on 781237-29. No noncomp llance 
noted. Major areas inspected: eeur itu plan tt Implementation 
re protection of SNM, security orgainiatton. Details uithheld. 
(PI* 10CFR2, 790). 

CHRI8TOFFER, 8. . HDWELL, J, C. , HIND, J. A. Re H ion 3, Chicago, 

Safeguards Dr-anch. 79/01/19. lp. 



7902260393 DOCKET 90-07 Huttlnghouie Critical Eiperiment 
Forwards "Annual Rept for 1978. " 
ROTH, J. M. WtitinohQuta Electric Corp. 79/02/09. IP. 



7902380231 DOCKET 50-111 North Carolina State Univ. Research Reactor 
Ack recaipt of application to reneui License R-i3, ftppl Icatlon 
U tlmelij,sa cxtetlng license is still valid. 
RElDiR. H- Operating Reactors Branch 4. 79/02/09. lp. 

790B130176 DOCKET BO-J2S Tesas AfcH Univ. Re*earch Reactor 
Foru-ardB safety- analyiei for Amend 7 to License R-93, 
Propo to modify Tech Bpec to permit radiography op up to 
9 Ib of explosive mat] In a radiography facility associated 
in/Nuclear Science Center Reactor. 
BERO.R.R. Texas A t, M Univ. 79/OH/06. ISpp, 



790226039& DOCKET 9O-87 Mestinghousn Critical Experiment 
"Annual Rept for 197B, " 
FEROUSIN, C. C. , ROTH.J.M. Metinghaue Electric Corp. 79/02/09. 

9pp. 

790208009& DOCKET 90-98 Univ. of Delaware Rosearch Reactor 
Ack receipt of 790103 Itr Informing NRC of stip taken to 
correct violations noted In IE Insp Repts 30-098/78-01 ti 
70-709/78-01. 

SMITH, O.H, Region 1, Philadelphia, Fuel Facility !< Materials 

Safety Branch. 79/01/19. lp. 



7902220119 DOCKET 30-133 Humbolt Dag Power Plant, Unit 3 
Inform* that TRADOC Pamphlet 35Q-3Qj "Interservice 
Procedures for Instruct Lanal 9ys Devetopnent" referenced, in 
NUREO-O217 it available In mlcr&F ieh* form from NRC. 
BESAW.W.J. Dlvllon of Sacument Control. 79/01/09. 2pp. 



7902260174 DOCKET 50-133 Humlxjlt Dag Pouer Plant, Unit 3 

Util motion to hold proceedings In abeyance until 791001 to 

enable addl geologic investigation & analysis. Certificate of 
Svc encl. 

LOCKE, R.D. Pacific Oas & Electric Co. 79/01/26, 9pp. 



7903080097 DOCKET 90-99 Univ. of Dilauare Research Reactor 
Responds to NRC 7B1214 Itr re violations noted in IE Imp 
Rept* 30-09B/78-01 fc 70-709/78-01. Corrtetive ctlons:all 
radiation protection instruments uiill be calibr at 6-month 
Intervals. Ful 1 compliance expected by, 770130. 
JQHANBEN, J. M, Delaware, Univ. of. 79/01/03. lp. 

7902080099 DOCKET 90-99 Univ. of Delaware Reiear-ch Reactor 
Forwards IE Insp Reptt BO-098/7B-01 S. 7O-709/78-01 on 781101 
& notice of violation. 

SHITHiO.H. Region 1, Philadelphia, Fuel Facility b Material* 

Safety Branch. 79/13/11, Spp. 



7902BA0331 DOCKET SO-133 Humbolt Bay Power Plant, Unit 3 
Info frojii license* on BVJR purging, 

SPENCER, G, 9. Region 3- San Franciico, Office of the Director. 

73/O2/1H, lp. 

79022B03B5 DOCKET BO- 133 Humbolt Bay Power Plant, Unit 3 
As fallouup to NRC 7B1113 request *r submittal of Offslte 
Dose Calculation Manual for approval, Forwards guideline* for 
general contents of manual. 

GRIMEBrB.K. Aislitanb Director for Engineers & Project*. 

79/01/ie, 5pp. 



79020B0100 DOCKET SO- 98 Univ. of Delauare Raearch Reactor 
Notice of violation from Imp on 7B1101. 

* Rtgion 1, Philadelphia, Fuel Factlltij b Haterlals Safety 

Branch. 78/13/22. lp. 

790SOBD104 DOCKET 9O-9a Univ. of Delauare Research Reactor 
IE Insp Rept* 50-098/78-01 fc 70-709/7B-01 on 7811O1. 
Noncompllance notad: f allurl to calibr radiation protection 
Instrument* durlngi 11 monthn prior to 701101 tc to submit 
annual Mar 1 operating rapti for past tuo ifrt, 
PLUMLEE, K, E. , CROCKER, H. H. Raglonl, Philadelphia, Fuel 

Facility b Materlalt Safetu Branch. 7B/12/11. 8pp. 



7702130010 DOCKET 80-133 Humbolt Bay. Power Plant. Unit 3 
Respond* to NRC 7B0929 i< 781124 Itr* transmitting IE 
Bulletins 76-12 l< 7B-12A "Abyplcal Meld Matl in Reactor 
Preura Vessel Melds." Plan* to propose schedule for 
submission ot into after vtudytng seismic Issues. 
CRANE, P. A, Pacific Oas & Electric Co, 73/12/06. ip. 



7902BSQ091 DOCKET 00-133 Hunbolt Bay Power Plant, Unit 3 
Reipond* to NRC 781219 Itr Forwarding IE Bulletin 70-14. 
Completed revleu indicaba* last raplacement of Buna-N natls 
occurred in Ouna 1979. All Buna-N matls In control rod scram 
igi uilll lie replaced before startup. 
CRANE, P. A, Pacific 04* Ei Electric Co. 79/01/37. 2pp., 



8 

7902120127 DOCKET 30-133 HwBibolt Dag Power Plant, Unit 3 
ForuariJi IE Info Notice 79-01, "Bergen-Paterson Hydraulic 
Shock t Swag Arrestors (H5SA). 
ENQELKEN.R. H, Region 5, San Francisc 

79/02/02. If.. 



DOCKETED ITEMS 



Office of the Director. 



7902330071 DOCKET 30-133 Humbolt Bay Poiuer Plant, Unit 3 

Forward's IE Bulletin 79-01, "Environ Qualification of Clati 
IE Equipment. " U/lit of 11 sgstematle evaluation program 
plants for which no action is required, 

ENGLEKEN.R. H. Region S, San Francisco. Office of the Dir 

79/03/09. tp. 

790227O38S DOCKET 30-133 Humbolt Bay Poiusr Plant, Unit 3 
Forwards IE Info Notice 79~03i "Limi torque Valvs Geared 
Limit Switch Lubricant." 

ENQLEKENi R. H. Region 5i San Franciscoi Office of the Dir 

79/03/09. Ip. 



7902050199 DOCKET 50-133 Humbolt Sag Power Plant, Unit 3 

Forward* "Quarterly Status Rept of Investigations b Mads, 
Qct-Dsc 1978, Rept 20. " 

CRANE. P. A. Pacific Gas fr Electric Co. 79/01/30. Ip. 



7902Q50163 DOCKET 50-133 Humbolt Bag Pouer Plant. Unit 3 

"Quarterly Status Rept of Investigation* !. Mods, Oct-Dec 
197B, Rept 20. " 

Pacific Oas Si Electric Co. 79/01/29. Ip. 



7902220030 DOCKET 30-133 Humbolt Bag Pouier Plant. Ui 
Forward! monthly operating rept for Jan 1979. 
WEEKS, E.D. Pacific Oas t< Electric Co. 79/02/12, 



IP. 



7902230032 DOCKET 30-133 Humbolt Dag Fouler Plant, Unit 3 
Monthly opsrating rept for Jan 1979. 
GETTY. B. C, Pacific Oai Si Electric Co. 79/02/OB. 3pp. 



7902060E71 DOCKET 30-134 Worcester Polytech Inst. Research Reactor 
Repti no change* in modi of operation or use of open pool 
reactor facil itg. Currently 3 senior licensee t> 3 operator 
llcanie at fat 1 Hty. Byproduct matl license has been renewed 
fc no other license amends currently ponding. 
HILBUHj L. C. Worcester Polytechnic Inst. 79/01/30. Ip. 

7902060273 DOCKET 30-139 Univ. of Washington Reeareh Reactor 
Forar-d "Annual Rept for 197B. " 
CHALK, H, B. Wellington. Univ. of. 79/01/30. Ip. 

7902O60.27S DOCKET 30-139 Univ. of Washington Research Reactor 
Annual operating rept for 1979. Includes dates of unscheduled 
shutdouns. corrective t preventive malnt.data re radioactive 
releases to environ ti environ surveys outside facility. 
Washington, Univ. of. 79/01/30. 3pp. 

790226O345 DOCKET 50-151 Univ. of Illinois Research Reactor 
Forward s "Annual Rept for 197B. " 
BECK.O.P., CHILTON.B.B. Illinois. Univ. of. 79/03/19. ipp. 



7902200041 DOCKET 30-153 Big Rock Point Muclear Plant 

Shutdown For refueling fc malnt estimated to last tuo months. 
KOSCHIK.M. 0. Consumers Power Co. 79/02/02. Ip. 

7903260393 DOCKET 30-135 Dig Rock Point Nuclear Plant 

Forwards proposed change to Tech Specs re updated spent fuel 

storage info.U/end Class II amend fee. 

DIXELiD. A. Consumers Power Co. 79/03/19. 4pp. 

7902270333 DOCKET SO-15S Big Rock Point Nuclear Plant 

Forwards addl info an topical rept XN-NF-7B-33. "Bio Roc* 
Point LOCA Analgsis Using the Enon Nuclear Co Non-Jet Pump 
BUR Evaluation Model, Large Break Eiample Problem," 
Revision 1. 
BIXEL, D. A. Consumers Pauier Co. 79/02/22. 12pp. 

7902270306 DOCKET 30-159 Dig RocV Point Nuclear Plant 

Responds to NRC 79O113 Itr bg agreeing to perform analysis 
of soismic review u/NHC in systematic evaluation program. 
BIXEL. D. A. Consumer* Pouer Co. 79/03/23. Ip. 

7902030149 DOCKET 30-133 Bin Rock Point Nuclear Plant 

Forwards description of Inaervice tet program for pumps, b 
valves 5. requests for relief from specific code 
requirements, based on ASME Boiler & Pressure Vessel Code, 
1977 edition. Supplements 7S1B32 Itr. 
BIXEL, D. A. Consumer* Pauer Co. 79/02/01. 2Bpp. 

7902330076 DOCKET 00-153 Bio Rock Point Nuclear Plant 
Preliminary review of 781222 submlttal. "Description of 
Inservice Insp Program & Requests for fitlief from Specific 
ABhE Code Requirements. " Approve* time eitenalon Cor insp 
program. 
ZIEMANN, D. L. Operating Reactors Branch 2. 79/02/01. 2pp, 

79031200S2 DOCKET 3O-1S3 Dig Rock Point Nuclear Plant 

Forwards IE Info Notice 79-01, "Bergan-Paterson Hydraulic 

Shock d Sway Arrettors <HB8A>". 

KEPPLEfl, J, 0. Region 3, Chicago, Office of the Director. 79/02/02. 



7902310316 DOCKET 30-133 Qlo Rock Point Nuclear Plant 

Forwards IE Dulls tin 79-01. "Environ Oualif ication of Clt 
IE Equipment." 14/list of 11 systematic evaluation program 
plants for which no action 1 required. 

KEPPLER.J.O. Raglan 3. Chicago, Office of the Director. 79/08/0?. 

Ip. 

7902270343 DOCKET 90-199 Dig Rock Point Nuclear Plant 
Forwards IE Info Notice 79-03, "Limitorque Valve Seared 
Limit Buitch Lubricant. " 

KEPPLER.J.O. Region 3, Chicago. Office of the Director. 79/03/09. 

Ip. 

7902120192 DOCKET 3O-156 Univ. of Wisconsin Re*earch Reactor 
Provides info re 17.8 kg of contained U-233 license limit 
b allocation tables relating to request for llcvnte amend. 
CA5HUELL, R. J. Wisconsin, Univ. of. 79/02/09. 2pp. 



7902220119 DOCKET 90-199 Big Rock Point Nuclear Plant 

Informs that TRADOC Pamphlet 390-30, "Inter*ervice Procedures 
for Instructional Sgi Development" referenced in NUREO-0219 
Is available 1 in microfiche form from NRC. 
BEBAW.W, J. DIvUion of Document Control. 79/01/09. 3pp. 



79022&017B DOCKET 90-133 Big Rock Point Nuclear Plant 

Forwards further NRC positions re fire protection program 
<Jtd 77032?.Uritten responses requested bg 790209. 
ZIEMANNiD.L. Operating Reactors Branch B. 79/01/29. 4pp. 

7903060339 DOCKET 30-153 Big Rod Point Nuclear Plant 

Inform* of title change from Security Operations Supervisor 
to Properlg Protection Supervisor effective immedlatelg. 
Chang* iiiill be reflected In revised securltg plans expected 
to on approved bg end of Feb 1979. 
HOFFMAN, D. P. Consumers Power Co. 79/03/01. Ip. 

790313036B DOCKET 30-135 Big Rock Point Nuclear Plant 

Forward i responses to NRC 790129 suppl staff positions re 
fire protection covering emergeneg shutdoun procedure, air 
handling equipment in control room !< Fire suppression sys. 
HOFFMAN, D.P. Consumer* Power Co. 79/02/13. 4pp, 



79022BOZB3 DOCKET 30-139 Big Rock Point Nuclear Plant 
Forwards revlted security plan,uhlch identifies 
unresolved Items tt basis for util positions. Also includes 
status of Security II mods It compensatory measures. Encl 
withheld (re* 10CFR2.790). 
HOFFMAN, D.P. Con*umers Power Co. 79/02/21, Ip. 



7902130134 DOCKET 90-199 Big Rock Point Nuclear Plant 
Forward* Endorsement 77 to AMI Policy NF-117. Reflects 
advance premium for 1979 calendar year, 
FOSTER. B.C. Consumer* Pouer Co. 79/02/07. 2pp. 



7902010399 DOCKET 30-136 Univ. of Wiiconnin Research Reactor 
porwerds IE Insp Rept 90-15&/7B-OS on 7B1B09-07, No 
noncompllance noted. 
HIND- J. A, Region 3, Chicago. Safeguards Branch. 79/01/22. 



7903010394 DOCKET 30-15& Univ. of Wisconsin Research Reactor 
IE Insp Rept 50-196/78-03 on 7B1B05-07. No noncotnpliance 
noted. Major areas Inspected; implementation of security plan 
re protection af SNM. security organization & alarm lys. 
Details withheld (ref 10CFR2. 790). 

MADEDA. T. J. . CQ8BURN, J. M. , HIND, J, A. Region 3. Chicago. 

Safeguards Branch. 79/01/1S. Ip. 

7902020227 DOCKET 30-1&0 Oeargla , Inst. of Tech. Research Reactor 
Answers question* raised by NRC In response to OA Teeh 
7S0913 request for mod of App A to license R-97. Answers 
concern oroaniiat lonal changes !< shim-safety blade maint. 
DAVIS.M.v. Otorgla Inititute of Technology. 77/01/23. 4pp. 

7902090119 DOCKET 90-171 Peach Bottom Atomic Pouer Station. Unit 1 
Forwards reviled title page. revised Page iv ti ney Page 16-1 
for Hay 1978 physical security plan, Also forwards cople* 
"Explanation of Revisions to Phyilcal Security Plan" dtd 
Jan 1979. Pagai h documents withheld (raf 10CFRB. 790). 
BRADLEY.E.J, Philadelphia Electric Co. 79/O1/31. 3pp, 

7903260399 DOCKET 90-183 Valleclto* Experimental 5up*rh*t Reactor 
Forward* Annual Rept 11 for deactivated vallvclto* 
experimental superheat reactor. 

CUMMINSHAM, 0. E. Oeneral Electric Co. .Nuclear Energy Products Div. 
79/03/09. Ip. 



DOCKETED ITEMS 



7-702260402 DOCKET 30-193 Vallecito. Experimental Superheat Reactor 
Annual Rept 11 for deactivated Vallecitos eiperimerital 
luparheat reactor for 1979. Concludes that reactor Is fining 
maintained in safe shutdown condition, 

V > 9mrml ""trie Co. .Nuclear Energy Products Div. 
3pp, 



7902260341 DOCKET 5O-1B3 Plum Brook Reactor - Mock-up 
Forward! "Reactor Standby Condition for NASA Plum Brook 
Mockup Reactor, Annual Rept for 197B. " 
DEY.H. , DIDELOT.R.C. National Aeronautics b Space Admin 



79/03/20. 



7902260344 DOCKET SO-1B3 Plum Brook Reactor - Mock-up 
"Reactor Standby Condition for NASA Plum Brook Mockup 
Reactor, Annual fiept for 197H. " 
4 
National Aeronautics & Space Admin. 79/OS/17. 3 PP . 

7902210139 DOCKET SO-1S6 Univ. of Missouri Research Reactor 
Forward! IE Insp Rapt 30-1S6/7B-03 on 7612O9-07 
No noncompliance noted. 

DAVI3.A.B. Region 3, Chicago, Fuel Facility I. Materials Safety 

Branch. 79/01 /OB, 2pp. 

7903210167 DOCKET 30-1B6 Univ. of Missouri Research Reactor 
IE Insp Rapt 90-1S6/7B-OS on 7B120a-O7.No noncompliance 
noted. Major areas inspected: radiation protection & radwaste 
mgt program*. 

H1ATT.J.W., MILLER, D. E. Region 3, Chicago, Fuel Facility 4 

Materials Safety Branch. 79/01/OB. 9pp. 

7902260B08 DOCKET 50-201 West Valley Reprocessing Plant 
Forwards requested documents: "Compilation of Radioactive 
Maste Disposal Classification Qys Data Base," "Interim 
Safety Evaluation 1" & NRC Itr forwarding former rept to 
Dept of Energy. W/o ancl. 
HAUQHNEY.C. J. Fuel Reprocess. & Recycle Branch. 79/01/23. lp. 

.790203014B DOCKET 30-201 West Val lay. Reprocessing Plant 

Responds to 781127 request for info. Forwards DOE "Western 
NV Nuclear Svc Center Study, Final Rept for Public Comment." 
Other rept* requested are available from NRCi request has 
been sent to. appropriate oft, 
OERTEL, 0. K. Energy, Dept. of. 79/01/16. 3pp. 

7902360071 DOCKET 90-201 West Valley Reprocessing Plant 

Ack receipt of encl 790104 Itr re fixing leak In uaste tank 
Hill forward Itr to NRC tinea high level ua.te tank BD-2 pan 
defects fall within NRC area of responsibility 
OERTEL, O.K. Energy, Dept. of. 79/01/lfl. 3pp. 

79022100B3 DOCKET 3Q-201 Mest Valley Reprocessing Plant 

Notification of 790313 meeting w/Nuclear Fuels Svc in Silver 

Spring, MD to discus* efforts to process technical data 

useful for future decontamination b decommissioning of 

facility. 

HAUOHNEY, C. J. Fuel Reprocess. ((Recycle Branch. 79/01/30. 



7902130103 DOCKET 30-201 West Valley Reprocessing Plant 
Summary of 790109 meeting in Silver Spring, MD rn efforti 
to process technical data useful for future decontamination 
h decommissioning of facility, 8. investigation of B-D2 pan 
defect, W/1964 Imp rtpts. 
HAUCHNEY, C, J. Fuel Reprocess, t, Recycle Branch. 79/01/31, 



3pp. 



13pp. 



79Q23B004B DOCKET 50-801 Melt Valley Reprocessing Plant 
Forwards IE Insp Rept 30-2Q1/7B-10 on 781120-21. No 
noncompliance noted. 

MARTIN.W.O. Region 1, Philadelphia, Safeguards Branch. 7B/1S/2Q 
2pp. 

7903260033 DOCKET 90-201 Welt Valley Reprocessing Plant 
IE Imp Rept 50-201/7B-10 on 781120-31. No noncompliance 
noted. Major areas inspected: nuclear mail control J. 
accounting. 

HOLODY.D. . JOYNER.J.H. 'Region 1, Philadelphia, Safeguards 
Branch. 7B/12/1B. 10pp. 

7902070006 DOCKET 30-201 Ueit Valley Reprocesilng Plant 
Ack receipt of 790109 Itr informing NRC of stsps taken to 
correct violations noted in IE Insp Rapt 90-201/7B-09. 
BMITH.O.H, Region 1, Philadelphia, Fuel Facility (. Materials 
Safety Branch. 79/01/19, lp. 

7902070007 DOCKET 30-201 Mest Vall.y Reprocasting Plant 
Respond! to NRC 781218 Itr re violations noted In IE Imp 
Rept 90-201/7B-09 on 7B1 118-17, Corrective actions; corrected 
tables to require surveillance surveys. Breathing lone air 
ample reiulti will be properly transcrlbst). 

OLDHAMiW.A. Nuclear Fuel Services, Int., West Valley Reprocessing 
Plant. 79/01/03, 3pp. 



7903070003 DOCKET SO-201 West Valley Reprocessing Plant 

Forwards' IE 'imp Rept 3O-301/7S-09 on 7B1113-17 4 notice of 

violation. 

SMITH, 0,H, Region 1, Ph 1 ladalph la, Fuel Facility & Haterialo 

Bafsty Branch. 7fl/ia/lB. 2pp. 

7902070010 DOCKET 30-301 West Valley Repi-ocBsBinfi Plant 
Notice of violation from insp on 7B1115-17. 

* Region 1, Philadelphia, Fuel Facility t< Materials Safety 

Branch. 78/13/13, ij>. 

7902070011 DOCKET SO-H01 West Valloy Reprocessing Plant 

IE Insp Rept 50-301/78-09 on 781 1 1 3-17, Moncomp 1 ianco noted: 
failure to follniu survey procedures t> failure to record air 
samp le evaluation. 

CLEMONS.P. E. , CRdCKEfl.H.W. Region 1, Philadelphia, Fuel 

Facility (, Materials Safety Branch. 78/12/13. 9pp. 

79022S0234 DOCKET 30-201 Ueat Valley Reprocessing Plant 

Forwards quarterly operating rept for Oct-Dec 197B. H/u encl, 
OLDHAM,W.A, Nuclear Fuel Services, Inc. (AUDI, of Getty Oil Co. ). 
79/01/24. lp. 

7902320119 DOCKET 30-206 San Onofro Nuclear Btation, Unit 1 
Informs that THADOC Pamphlet 3SO-30, "Inter aoi-vice 
Procedures for Instructional Bys Development" reParenced In 
NUREO-0219 it available in microfiche form from NfIC, 
BESAU.W.J, Division of Document Control. 79/O1/09. 2pp. 

79022703B9 DOCKET SO-H06 San Onofro Nuclear Station, Unit 1 
Suggest mnds to fire protection plan, re electrical valve 
supervision & portable smoke venting equlprnment. 
HALL, R.E. DrooHiaven National Laboratory. 79/01/31, 3pp, 

7902260233 DOCKET SO-EOfi San Onofre Nuclear Station, Unit I 
Forwards summary of PHR purging & venting ei perleuces. 
BEVFRIT.K.V. Region 4, Dallas, Office of the Director. 74/09/O3 

4pp. 

7902210197 DOCKET 30-306 San Dnnfre Nuclear Station, Unit 1 
Brief rept supplementing 7B092S rapt re reviiu of facility 
seiimic analysis. Analysis meets objective of demon* tra ting 
that reactor bldg, containment & reactor coolant loop can 
survive design basis earthquake. 
ZUDAN9, Z. Franklin Institute Research Laboratory. 70/13/39. 2jip. 

79Q2B6099Q DOCKET 30-206 Ban Onofre Nuclear Station, Unit 1 

Forwards comments on geologic fc seismic repts uied in 

geologic reviaw. Discusses onshore faul ts, fractures Sr iheai- 

joints underlying facility, basement roe* cc-mpl* I, offahoro 
gravity & magnetic data. 
DAVIB.J.F. California, State of, 79/01/16. 3pp. 

7902140239 DOCKET 30-20i San Onofre Nuclear Station, Unit 1 

Updates status of evaluation of potential for teal ring or 

biological shielding to become missile in evant of LOCA pipe) 
break. Studies do not provide sufficient Info to reiolvn 
question. 

HAYNES.J.fl. Southern California Edison Co. 79/02/07. lp. 

790S260199 DOCKET 30-206 San Onofre Nuclear Station, Unit 1 
Forwards draft evaluation of systematic evaluation program 
Topic 11-3. C. Requests response of either confirmation or 
correction of facts yithln 30 days. 
ZIEMANN, D. L. Operating Reuctors Branch 8. 79/02/OH. 30pp. 

7902260202 DOCKET 30-206 Bin Qnofre Nuclear Station, Unit 1 
Forwards draft evaluations for systematic evaluation program 
Topics V-10.D,V-ll.D,Vll-3 (, X r safe shutdoun sys.Re.iu.st! 
response of either confirmation or correction of facts 
within 30 dayi. 
ZIEKANN.D.U. Operating Reactor* Branch B. 79/03/09. IO7pp. 

7902190021 DOCKET 90-306 Sin Onofre Nuclear Station, (/nit 1 
Respond* to 7B0959 Itr transmitting IE Dullotin 7B-I2, 
"Atypical Weld Matl in Reactor Presure Vst.ol W*lds " 
Unable to ra*pond within 60 days. Seeking assi.tance from 
Wastinghouse d uiill respond at a later data. 
HEAD.J. T. Southern California Edison Co. 7B/11/SB. lp. 

7902230274 DOCKET 90-H06 Ban Onofre Nuclear Station, Unit 1 
Forward* IE Insp Rept 30-206/78-17 on 7B1219-S1 No 
noncomplianEa noted. 

BOOK,H,E. Region 3, Qan Francisco, Fuel Facilitu b Material. 

Safety Branch. 79/01/09. 3pp. ir* 

790S22027A DOCKET SO-H06 San Onofre Nuclear Station, Unit J 
IE Insp Repl 30-206/7B-17 on 701819-31. No noncdrnp H-i" 
noted. Major areas Inspected: observation of emergencu drill, 
drill critiquo b rsvieu of status of revision! to plan 
CURTIB.J.R , BOOK.H.E. Region 3, Ban Francisco, Fuel Facilitu (, 

Materials Safety Branch. 79/01/09. 9pp. * 



10 



DOCKETED ITEMS 



790-2120138 DOCKET 50-206 San Onnfre Nuclear Station. Unit 1 
Forwards IE Info Nqtice 79-01 , "Herg en-Paterson Hgdraulic 
Shock 1 Sway Arrestors (H35A). " 
ENQELKEN, R, H. Regian 3, San Franciaco, Office of thB Direc 

79/oa/oa, ip. 



7902260430 DOCKET 30-313 Haddam Neck Plant 

Forwards proposed Tech Spac chanaos re removal schedule far 
reactor vessel surveillance capsule* per 1OCFR50. 90 App H ti 
organ! latl ona 1 t administrative chanfles. W/enc 1 revision fee. 
CQUN61L.W. 0, Connecticut Yankee Atomic Power Co. 79/O1/14. 



12pp. 



7902230071 DOCHEr 30-206 San Onofre Nuclear Station. Unit 1 
Forwards IE Bulletin 79-01. "Environ ftual ification of Class 
IE Equipment. " W/list of 11 systematic Evaluation program 
plants fur uihich no action Is re-quired. 

ENQLEKEN, H. H. Region S, Ban Francisco. Office of the Director 

79/O2/O9. Ip. 



7902130177 DOCKET 50-213 Haddam Neck Plant 

Forwards repb r> fish impingement overruns. As of 790131.279 
apottail shiners were impinged, exceed ing monthly limit. 
Sosional temp changes contributed to increased imp inBBment. 
Cauie in no uiag connected to changes in plant operations. 
CRAVES, R.H. Connecticut Yankee Atomic Power CD. 79/02/02. 



Ip. 



7902270390 DOCKET 50-2-06 San Dnofre Nuclear Station. Unit 1 
Forwards IE Info Notice 79-O3. "Limltorque Valve Geared 
Limit Switch Lubricant. " 

ENQLEKEN, R, H. Region S. San Francisco, Office of the Director 

7-9/02/09. lp._ 

7902140116 DOCKET 30-206 San Dnofre Nuclear Station, Unit 1 
Forwards monthlg operating rept for Jan 1979. 
CURRAN, J. H. Southern California Ediion Co. 79/02/05. Ip. 

7-!Oai'IOllH DOCKET 30-206 San QnnPro Nuclear Station. Unit 1 
Monthly operating rept for Jan 1979. 
QQUUD.W. Southern California Edison Co. 79/02/03. 5pp. 

7902I30U1 DOCKET 30-306 San Onofre Nuclear Station, Unit i 
Forwards LER 79-001/O3U-0. 
HEAD.J.T. Southern California Edison Co. 79/02/06. 2pp. 



7902310007 DOCKET 30-213 Haddam Neck Plant 

Confirms 790221-82 site visit. Purpose of visit is to observe 
site-specific features of facility re seismic design. Meeting 
agenda. ltd evaluation plan siamic review b request for addl 
Info end. 
ZIEMANN,D. L. Operating Reactors Branch 2. 79/02/O2. 35pp. 



7902220095 DOCKET 30-513 Haddam Neck Plant 

Responds to request by T Wambach. Forwards addl aperature 

cards depicting general electrical sus. U/n encl. 

COUN8IL, U. Q. Connecticut Yankee Atomic Power Co. 79/02/07. 



IP- 



7902270294 DOCKET 50-213 Haddam Neck Plant 

Responds to NRC 790116 Itr requesting utll to review factual 
accuracy of tun draft systematic evaluation program 
evaluations. Finds drafts substanti veil) correct re current 
plant design features. Battery discharge test was omitted. 
COUNBIL. W. 0. Connecticut Yankee Atomic Power Co. 79/02/16. Ip. 



7902130112 DOCKET 9O-2Q6 Ban Onofre Nuc 1 oar Station, Unit 1 
LER 79-001/O3L-0 on 790IQ9; during normal operations, while 
testing containment isolation valvea, isolation valve on 
cooling mater from containment air handling units failed to 
close, Eiact cause undetermined, 
CUHRAN, J.M. Southern California Edison Co. 79/OS/07. Ip. 

7903220119 DOCKET 3Q-23 Haddam Neck Plant 

Infor/M that TfJADOC Pamphlet 33O-30. " Interservics Procedures 
for Instructional Su.s D-tvolppment" referenced in NUREO-0219 
is available in microfiche form From NRC. 
BE8AH,W.J. Division of Document Control, 79/01/09, Spp. 



7902010262 DOCKET 3O-213 Haddam Neck Plant 

Forwards IE Circular 79-02, "Failure of 120 Volt Vital AC 
Power Supplies. " 

ORIER.D.H. Run ion 1, Philadelphia, Office of the Director. 

79/01/16, Bpp. 

7902140149 DOCKET 30-213 Haddam Neck Plant 

Ack receipt of 790102 Itr Informing NRC of step* taken to 

correct violation noted in IE Insp Refit 8O-213/78-27. 

NDntnmpliance reduced to def ic iencij. 

BRUNNERiE.J. Region 1, Philadelphia* Reactor Operations Nuclear 

Support Branch. 79/01/22. Bpp. 



7902020244 DOCKET HO-213 Haddam Nee I Plant 

Clarifies utll position concerning Amend 28 to DPR-61, in 

p-artlcular re fire protection sijs.Isi.uei discussed include 

yard hydrants, alternate shutdown capability & fire water 

pipinj icjt, 

CQUN91L,H. 0. Connecticut Yanfcse Atomic Power Co. 79/01/24, 3pp. 

7902070087 DOCKET 50-213 Haddam Heck Plant 

Forwards NRC position re deficie-ncg in modified amended 
security plani to provide opportunity for util to 
incorporate suggested add i tlon. Reviews appeal process, 
Detail I withheld (ref lOCFRa. 790). 
71El\NN,D. L. Operating Reactors Branch 2. 79/O1/25. Ip. 

7903130140 DOCKET 30-213 Haddam (Jeci Plant 

Foruardi rtfliands 92 d 33 to rndennltg Agreement HF-3? to set 

forth 1979 advanced premium & lo amend util lite 

deicrlp tlan, respect ively. Plant site drauiing Encl 

SEOER,R.M. Connecticut Yankee Atomic Pouor Co. 79/02/06. Spp. 



79OH13019B DOCKET 50-213 Haddam Neck Plant 
Forwards Endorsement sa to Policy NF-15I, 
SEOER, R. M. Connecticut Van I no Atomic Power Co. 



7902140161 DOCKET 30-213 Haddam Neck Plant 

Respond! to NRC 781204 Itr re. violation noted in IE Imp 
Rept SO-213/7B-27. Since Tech Specs do not address height 
requirement. requests alleged violation be rescinded. 
CDUNS1L. W. 0. Connecticut Yankee Atomic Power Co. 79/01/02. 



Spp. 



79/02/06, 2pp. 



7902140163 DOCKET 30-213 Haddam Neck Plant 

Forwards IE Insp Rept 50-213/78-27 on 7B1113-16 tt notice of 

violation. 

DRUNNER.E.J. Region 1, Philadelphia, Reactor Operations Nuclear 

Support Branch. 7B/12/04. 2pp. 

790214017B DOCKET 30-213 Haddam Neck Plant 
Notice of violation from inap on 7S1113-1&. 

Region 1, Philadelphia, Reactor Operation* Nuclear Support 

Branch, 7B/1S/01. tp. 

7902140183 DOCKET 50-213 Haddam Neck Plant 

IE Insp Ilept 50-E13/7B-37 on 7BI 113-16. Noncomp 1 iance noted: 
failure to provide adequate lacked barrier for high 
radiation areas. 

LAZARUS, W. J, , KEIMIO.tt.R. Region J, Philadelphia, Reactor 

Operations Nuclear Support Branch. 78/12/01. llpp. 



790B200010 DOCKET 90-313 Haddam NB-C t Plant 

Foruards certified copies al Endorsement 3 to MAELU Binder 

XD-I1, for calendar year 1979. 

aEOEft, R. H. Connecticut Yankee Atomic Power Co. 79/02/O7. 



7902200069 DOCKET 50-513 Had dam Neck Plant 
Forwards Endorsement 4 to Dindor EB-li. 

. M, Connecticut Yankee Atomic Pouer Co. 



3pp. 



79/02/09. 2pp. 



7902260333 DOCKET 30-213 tfaddani Neck Plant 

Foruardi summary of PWR pursing & venting eperiencoB. 
SEVFRIT.K.V. fiejiDn 4, Dallas, Office of the Director. 74/09/1 

4pp. 

7902010230 DOCKET 80-213 Haddsrn Nee* Plant 

Forward* three draft evluationi of njmtamatlc evaluation 

pragram topic* re atmospheric transport, di ffusion % battery 

capacity tests. Plant deviates bij not meeting battery test 

rqulren*nts. 

ZlEMANNi D, L. Oparatlnff RBJCtora Branch 2. 79/01/16. 8pp. 

7903030197 DOCKET 90-213 Haddam Neck Plant 

Foruards revisad svttematic evaluation projram for high/low 
pretsur* si;s iialatlon>ln rsaponea to NRC 7B123B comments. 
COUNSIL.H.O. Connecticut Yankee Atomic Pouer Co. 79/01/23. 3pp. 



7902130036 DOCKET 30-213 Haddam Neck Plant 

Forwards IE Info Notice 79-01. "Dergen-PatBrson Hgdraulic 
Shock & Bwau Arresters (HBSA). " 

BRIER, B.H. Region 1, Philadelphia, Office of the Director. 

79/02/03. Ip. 

79022B04B3 DOCKET 30-213 Haddam Neck Plant 

Forwards IE 'Bulletin 79-01, "Environ Qualification of Clai* 
IE Equipment. " W/list of 11 systematic evaluation program 
plants for uhlch no action is required. 

ORIER,.D,H, (legion 1, Philadelphia. Office of the Director. 

79/02/08. IP, 



7903220063 DOCKET SO-213 Haddam Nock Plant 
Foruards monthly operating rept for Jan 1979. 
CRAVES, R. H. Connecticut Yankee Atomic Pouier Co. 



79/02/10. Ip. 



79022BOOM DOCKET 90-213 Haddam Neck Plant 
Monthlg operating rept for Jan 1979. 
EPPINQER.R. L. Connecticut Yankee Atomic Pouter Co. 
ISpp. 



7902230123 DOCKET SO-213 Haddam Neck Plant 
Foruards monthly operating rept for' Jan 1979. 
GRAvEB.R. H. Yankee Atomic Electric Co. 79/02/10. Ip. 



DOCKETED ITEMS 



7902330123 DOCKET 50-213 Hitddam Neck Plant 
Monthlg operating rept For Jan 197*?. 
EPPINOER.R. L. Yankee Atomic Electric Co. 



ISpp. 



7902240397 DOCKET DO-213 Haddam Neck Plant 

Responds to IE Imp Rapt SQ-213/7B-03; on 790127 during 
re fuel Ing shutdown, plant computer alarmed, indicating 
discharge temp greater than ETS limit of 8 F/h. 
QRAVES, R.H. Connecticut YanVee Atomic Pouer Co. 79/02/12. 



7903330138 DOCKET 30-313 Haddam Nee * Plant 

RQ 79-01/P: uhi le preparing to alp fuel assemblies being 

discharged from core, assemb ly H-20 t< eight rods on periphery 

uere found to have cracks Prom 1 to B inches long in 

cladding. 

GRAVES, R. H. Connecticut YanVee Atomic Pouer CD. 79/02/15. Ip. 

7902220119 DOCKET 50-219 Oyster Creek Nuclear Power Plant 

Inform* that TRADDC Pamphlet 33O-30. " Internervice Procedures 
for Instructional Sys Development" referenced in NUREQ-0219 
it available In microfiche form from NRC. 
BESAH.W.J. Dlvlilc-n of Document Control. 79/01 /O9, 3pp. 

79Q20BOI98 DOCKET 30-319 Oyster Creek Nuclear Power Plant 
Forwardi map showing local authorities tt organisations 
capable of providing assistance In emergency. Emergency plan 
currently under review. Revl sod copies lull I be sent when 
completed, W/l oversiie map. 
FINFHOCK, I. R. Jersey Central Pouler S. Light Co, 79/01/31. 2pp. 

7902330146 DOCKET 30-219 Oyster CreeH Nuclear Power Plant 

Forward i Revision 9 of physical security plan In roiponse to 

NRC questions !> comments an Revision 4. Items 1 5. re 

vital area designations tt "insider" control procedures are 

not addressed In this revision. 

FINFROCK, I, R. Jersey Central Pouer ti Light Co. 79/03/14. Ip. 

7902230313 DOCKET 30-319 Oyster Creole Nuclear Ppuer Plant 
Notice of proposed Imposition of civil penalties of 26, OOOi 
for violation! lilted In accompanying notlc e. Ponal ties must 
be paid or protested In writing with ing 50 dags, 
* Office of Inspection Si Enforcement. 79/01/12, 2pp, 

7902030246 DOCKET 30-219 Oyster Creek Nuclear Power Plant 
Forwards Endorsement S to MAELU XB-13. 
CERETY. H. F. OPU Service Corp. 79/01/31. Spp. 

7902310171 DOCKET 50-219 Oyster Creek Nuclear Power Plant 
Forwards Endorsement S to Policy ED-13. 
OEHETY. H. F. GPU Service Corp. 79/02/13. Spp. 

7902230049 DOCKET 30-519 Oysttr Creek Nuclear Pouer Plant 
Forwards certified copies of Endorsement 48 to MAELU NF-44 
for calendar year 1979. 
OERETY. H. F. OPU Service Corp. 79/02/18. 2pp. 



7902270379 DOCKET 80-219 Oyster Creek Nuclear Power Plant 
Forwards Endorsement bZ to ANI NF-164 re advance Si std 
premium for calendar year 1979 b amend of Condition 4. 
OERETY, H. F. CPU Service Corp, 77/02/22, Bpp. 

7902260343 DOCKET 30-519 Oyster Creek Nuclear Pouier Plant 
Forwards summary re OUR purging tt venting eiperiences. 
HRUNNERi E. J. Region 1. Philadelphia. Reactor Operations Nuclear 

Support Branch. 76/09/12. 3pp. 

790314021 S DOCKET 30-219 Oyster Creek Nuclaar Pouer Plant 

Forwards binder* & nuts of divider tabs for use W/NEDO-218BB 
"Mark 1 Containment Program Load Definition Rept, " 
SOBONi L. J. Oeneral Electric Co.iNuclear Energy Products Dlv. 
79/01 /OS, Bpp. 

7902520297 DOCKET 30-219 Oyster Crieli Nuclear Pouer plant 
Responds to 790111 request For revieu of paper "Vent 
Clearing During aimulate.d LOCA in a Mark I BUR, Pressure- 
Bupprassion Bys. " Recommends acceptance of paper tor 
pub 1 Ication. 
CRIMES. C. Plant Systems Branch, 79/01/31. Spp. 

7902260062 DOCKET 30-219 Oyster Creek Nuclear Pouer Plant 
Notification of 790204 meeting w/Jeraey Central Power & 
Light In Bethssdar MDi to discuss systematic evaluation 
program re pipe breaks inside containment. 
NOHICKI.S, J. Operating Reactors Branch 2. 79/01/31. Ip. 



7902080195 DOCKET 80-219 Oyster Creek Nuclear Power Plant 
Submits Dec 1978 program activity revi BU, compr i sed of info 
from elected sectioni of monthly rep ti lu/necti on on contract 
b billing status removed. Li sta meeting* field I provides 
task-by-task activity summary. 

BOBGN.L.J. Oeneral Electric Co. .Nuclear Energy Products Dlv. 
79/02/OS. I Op p. 

7902080225 DOCKET 50-219 Oyster Creek Nuclear Pouier Plant 
In response to NRC 7B123B 1 tr, f oriuardB summary rept re 
qualification requirements t status gf qualifications for 
133 volt DC lys mod related equipment. 
FINFHQCK. I, R. Jersey Central Pomer b Light CD. 79/02/05. 22pp. 

7903360470 DOCKET 30-319 Oyster Creek Nuclear Power Plant 
Comments on systematic evaluation plan Topic V~10. A, "RHU 
System Neat Eichanger Tube Failures" re reactor bids cooling 
sys & process steam sys. 
FINFROCK, I. R. Jersey Central Power J. Light CD. 79/02/14. Ip 

790226043d DOCKET 00-319 Oyster Cree* Nuclear Power Plant 
Responds to 781113 request for radiological effluent Tech 
Specs infoi specif ically an an Offsite Dose Calculation 
Manual t> process control program. Licensee cannot meet 
BChedulei but will forward info by 790513, 
FINFRQCKi I. R. Jersey Central Pouier & Lifaht Co. 79/02/16. Ip. 

7902010196 DOCKET 50-219 Oyster Creek Nuclear Pouier Plant 
Forwards IE Insp Rept 50-219/78-33 qn 7BJ 1 14-16. No 
nnncompl iance noted. 

SMITH.O.H, Region i, Philadelphia, pjiel Facility tc Materials 

Safety Branch. 78/12/20, 2pp, 

7903010201 DOCKET 30-219 Oyster Creek Nuclear Power Plant 
IE Insp Rept 90-319/78-32 on 781114-16. No nontompl lance 
noted. Major areas Inspected: licensee 'B chemical ti 
radlochemical measurements program using NRC: I Mobile 
Radiological Measurement Lab. 

KOTTAN.J.J,. OLOSKIiD.M.. BTOHR, J. P. Region 1. Philadelphia. 

Fuel Facility !. Materials Safety Branch. 7B/12/19. 8pp. 

7902210043 DOCKET 30-31? Ouster Creek Nuclear Power Plant 
Forwards IE Insp Rept 5O-219/79-33 on 791212-14. No 
noncompliancs noted, 

CARLSON, R. T. Region 1. Philadelphia. Reactor Construction ti 

Engineering Support Branch. 79/01/05. 2pp. 

7902310053 DOCKET 30-219 Oyster Creek Nuclear Pnuer Plant 
IE Insp Rept 30-219/79-35 on 791212-14. No noncompl iance 
noted. Major areas inspected: review of plant Fire program & 
125 volt DC power sys mod. 

FINKEL.A.E,, EBNETTER, S. D, Region 1, Philadelphia. Reactor 

Construction d Engineering Support Branch. 79/01/05, 13pp. 

7902010287 DOCKET 50-319 Oyster Creek Nuclear Pouiar Plant 
Forwards IE Circular 79-03, "Failure of 130 Volt vital AC 
Pouier Supp 1 1 es. " 

ORIER.D.H. Region 1, Philadelphia, Office of the Director. 

79/01/16, Spp, 

7903130012 DOCKET 50-219 Ojster Creek Nuclear Pouer PUnt 
Forwards IE Info Notice 79-01. "Bergen-Patorson Hydraulic 
Shock b Sway Arresters (HBSA). " 

ORIER.B.R Region 1, Philadelphia, Office of the Director. 

79/02/03, Ip. 

79022BOS10 DOCKET 30-219 Oyster Creek Nuclear Pouiar Plant 
Forwards IE Bulletin 79-01, "Environ Qualification of Clan 
IE Equipment." M/llst of 11 systematic evaluation program 
plants for which no action is required, 

OSIER, D.H. Region 1. Philadelphia, Office oF the Director. 

79/02/08. IP 



7902050134 DOCKET 30-219 Oyster Creek Nuclear Pouter Plant 

Forwards monthly operating rept for Nov 1978 fc maint summary 

omitted from 781214 submittal. 

ROSS, D. A. Jersey Central Power !< Linht Co. 79/01/24. Ip. 



7903030143 DOCKET 30-219 Oyster Creek Nuclear Power Plant 

Monthly operating rept For Nov 1979, It mflint summary omitted 

from 781314 transmmi ttal. 

MCCLAIN, q. M. Jersey Central Pouier fc Light Co. 78/12/14. 14pp. 



7902230106 DOCKET 90-319 Oyster Creek Nuclear Pouer Plant 
Forwards monthly operating rept for Jan 1979. 
ROSS, D. A. .Jersey Central Power t Light Co. 79/02/14. Ip. 



7902080176 DOCKET 30-219 Oyster Creek Nuclear Pouier Plant 
Responds to NHC 781321 Ur re verification of data 
in systematic evaluation program Topic V-l 1. A. Update to 
"Evaluation of Isolation of Lou Pressure Sys from Reactor 
Coolant Sgs" eric 1. 
FINFRaCK, I. R. Jersey Central Power t" Light Co. 79/02/03. 



4pp. 



7902230107 .DOCKET 30-219 Oyster Creek Nuclear Power Plant 
Monthly operating rept for Jan 1979. 
KCCLAIN.q.M. Jersey Central Pouer b Light Co. 79/02/14. Bpp. 

7902230113 DOCKET 3O-219 Oyster Creek Nuclear Power Plant 
Forwards LER 79-001/03L-0. 
ROSS. D, A, Jersey Central Power t Light Co. 79/02/15. Ip. 



DOCKETED ITEMS 



7902330119 DOCKET 50-219 Ouster Creek Nuclear Power Plant 
LER 79-00-1/03L-0 on 79011B:valve V-14-35 failed to open 
ctuny lete Ig during routine isolation condenser valve 
operabilitij test. Caused bij dirty torque limit suited 
contacts, whith were subsenuentlij cleaned !< burnished. 
ROBS, D. A. Jerieu. Central Power (. Light Co. 79/02/15. 3pp. 

7902230061 DDCK.ET 90-220 Mine Mile Point Nuclear Stations, Unit 
Informs that TRADOC Pamphlet 350-30. "Interservi c e Procedures 
fur Instructional Sys Development" referenced in NUREO-QB19 
is available in microfiche form from NRC. 
DESAW.H. J. Division of Document Control. 7B/1I/20, 3pp. 



79Q23c.014E) DOCKET 30-220 Mine Mile Point Nuclear Stations, 
Forwards Amenil 2i tn DPR-&3. U/enc 1 safety evaluation b 
notice of issuance. 
IPPOLITO. T, A. Operating. Reactors Branch 3. 79/01/29. 



2pp. 



79Q226O132 DOCKET 3O-2EO Nine Mile Point Nuclear Station*, Unit 1 
Amend 26 to BPH-63. Amend revise* Tech Spec to Incorporate 
requirements for e-gtab 1 ieJiing & maintaining the drywell to 
suppression cfvamber differential pressure & suppression pool 
water level. 
* Operating Reactors Branch 3. 79/01/29. 19pp. 



7902220119 DOCKET 30-22O Nine Mi 1 B Point Nuclear Stations, Unit 1 
Inform* that TRADHC Pamphlet 35O-30, "Intenarvi c a Procedures 
far Instructional 8ys Development" referenced in NUfiEQ-0319 
is available In microfiche form Fran) NRC. 
BESrtH.H.J. Division of Document Control. 79/01/09. 2pp, 

7902060313 DOCKET 30-320 Nine Mils Point Nuclear Stations, Unit 1 
Supplements 790102 responses to NF1C 761 127 Itr re fire 
protec tion. W/enc 1 schedule for fire protection activities. 
DISEi D. P. Niagara Hah auk Power Carp. 79/01/31. 13pp. 

7902130131 DOCKET BO -330 Nine Mile Point: Nuclear Station*, Unit 1 
Asls Commission to halt radwaste incinerator project by 
withdrawing Niagara-Mohawk pouiar Corp const permit until 
public concerns are satisfied. 
HERMANS, R. Af f 1 1 ia ti cm Unknown. 79/O1/22 Ip, 

7vQ2060BiO DOCKET 50-230 Nino Mile Point Nuclaar Stations. Unit 1 
Forwards Endorsement 52 to HAELU Policy MF-46 setting fortfl 
advance premium for calendar year 1979. 
RU3HMORE, J. W, Niagara Mohawk Power Corp. 79/01/31. 2pp. 

7902060262 DOCKET 30-230 Nine Mile Point Nuclear Stations. Unit 1 
Forward! certified copy of Endorsement 62 to Policy NF-161 
setting forth advance premium for calendar year 1979. 
HUSHWDRE. J. W. Niagara Mohaufc Power Corp. 79/01/31. 2pp. 



7902260195 DOCKET 3O-3HO Nine Mile Point NucleBT Stations, Unit 1 
Safety evaluation supporting Amend 2i to DPR-A3. 
* Office of Nuclear Reactor Regulation. 79/0-1/39. bpp. 

7902260157 DOCKET 8O-22O Nine Mile Point Nuclear Station*. Unit 1 
Nqtlte of issuance of Amend 2& to DPR-A3. 
IPPOLITO, T. A. Operating Raactorl Branch 3. 79/01/39. Spp. 

7902! 30096 DOCKET 50-220 Nina Mile Point Nuclear Stations. Unit 1 
Requests ad d 1 info re plans to install radioactive waste 
solidification & handling sys in order to complete NftC 
rflvleiu.Encl questions to be ansuered t, submitted bu 790301. 
IFPQLITO.T. A. Operating Reactors Branch 3. 79/01/30. 3pp. 

770BQ902B7 DOCKET 90-230 Nine Mile Point Nuclear Stations. Unit 1 
Ack receipt of application on 790109 for ravleui & approval 
of amend to License DPR-AS to revise Tech Spec! re 
continuous le-a* rate mon Itoring, Requests payment of 
Class III fee. 
DIQOB.R.M. License Fee Management Branch. 79/O1/31. Ip. 

7903220 357 DOCKET 50-220 Nine Mile Point Nuclaar Stations, Unit 1 
Responds to 77OI1I request for revioui of paper "Vent 
Clearing During Simulated LOCA in a Mark I BUR Pressure- 
Suppression Sys." Recommends acceptance of paper for 
pub 1 1 cat ion. 
CRIMES, C. Plant Systems Branch. 79/O1/31. 2pp. 



770B0003B3 DOCKET 50-320 Nina Mile Point Nuclear Stations, Unit 1 
Forwards Endorsement B to Di niter EB-12 I, HAELU Hinder XE-13 
re tecon-darij financial protection. 
HUSHMDF1EJ J. W. Niagara Mohauk Pouer Corp. 79/01/31. 9pp. 

79Q2B60343 DOCKET 50-320 Nine Mile Point Nuclear Stations. Unit I 
Forwards summary of DWR purging tt vanting ep*r i once s. 
ERUNHEfl,E, J. Region I. Philadelphia, Reac tor Operations Nuc 1 oar 

Support Branch. 76/03/12, 3pp. 

79022101B9 DOCKET 90-220 Nine Mile Point Nuclear Stations, Unit 1 
Forwards partial responses to questions In 79D1O3 Itr re 
raduatte raductlon sgs. Di scussrs annual man-rera estimate's !< 
transfer of solid waste ash From dry cyclone to product 
container. W/oversi led draining available In Central Files. 
SCHNEIDER.R. R. Niagara Mohauli Pou*r Corp. 79/O2/12. ISpp. 

7902 M O2 IB DOCKET 50-320 Nine Mile Point Nuclear Stations, Unit 1 
Forwards binders & sets of divider ta-os for use U/NEDD-21B3B 
"Marl 1 Containment Program Load Definition Rept. " 
SDDDN.L. J. -General Electric Co. .Nuclear Enoroij Products Div. 
79/01 /OH. 6pp. 

790S360235 DOCKET 50-220 Nine Mile Point Nuclear Stations. Unit 1 
Summarl IBS 701313 meeting in Bettteida, HD, w/represanta ti vos 
of utils. u/post-CP applications to discuss pending" OL 
revieu matters, includ ing staff polities ft revieui priority 
erf teria. Discussion areas It attendees list and. 
LICITRA.E. Light Hater Reactors Branch S. 79/01/12. Opp 

7702010253 DOCKET 30-220 Nine Mil* Point Nucl ear' Sta tlons. Unit 1 
Requests addl info re proposed TBifuiaite vol reduction iys as 
required t>y 1GCFH20. 305. Intends to discuss related items 
durino 79013O meeting in Ostiiego.NV. 
1PPDLITO.T. A. Operating Heactors Branch 3, 79/01/16. 7pp. 

79022BQ3B5 DOCKET 50-3SO Nine Mile Point Nuclear Station*. Unit 1 
JU Pollowup to NRC 731115 request for subraittal of Offslto 
Dose Calculation Manual for approval, forward s guidelines for 
genera) contents of manual. 

GR1MES.B. K. Assistarvt Director for Enoinears 6 Projotts. 

79/01/1B, 9pp. 

79D20S030B DOCKET 30-520 Nine Mile Paint Hue 1 ear Stations, Unit 1 
Ack receipt; of 7SHB1 1 tr. Bflc;usstB addl Info to complete 
rovLaui of Reload 7 suAnl ttal . 
1PPOL1TO.T. fi. Operating Reactors Branch 3. 79/OE/I9. 4pp. 

790203QOS8 DOCKET &O-22O Nine Mile Point Nuclear Stations. Unit 1 
fleiponds to 7B1221 Itr. Refuges to refund 8300- fen required 
for revleu of proposed raduaste reduction sys. Class IV 
status iu jiustlFied on baalt that ettenslve H1A is needed. 
HILLER.H.O. License Fee Manaaefflant Dranch. 79/01/26. Ip. 



79020B0195 DOCKET 50-220 Nine Mile Point Nuclear Stations, Unit 1 
Submits Dec 1"?7Q program activity review, comprised of info 
from selected sections of mon.thlu. rept, u/s*c tlon on contract 
I* billing status removed. L 1 its (nestings held t> provides 
tatk-bij-ta sk activity summary. 

SODQN.L.J. General Electric Co. .Nuclear Energy Products Div. 
79/02/05. 10pp. 

7902200024 DOCKET 5O-22O Nine Mile Point Nuclear BtationE, Unit 1 
Forwards aifdl fee for approval of Te-ch Spec amend request re 
deletion of continuous leak rate monitor Ing . W/enc 1 memo re 
distribution. 
DfBE. D, P. Niagara Mohauh Poiuer Corp. 77/O2/05. 2pp. 

79O31flOB37 DOCKET 50-220 Mine Mile Point Nuclear Stations, Unit 1 
Forwards summary of plant changes mado in 197B. All changes 
made per 10CFR50, 5"? include safety analyses on file. Change 
In spent fuel pool made after NFiC approval. 
SCHNEIDER, Fl. R. Niagara Mohawk Pouer Corp. 79/02/07. 3pp. 

79022301Kb DOCKET 5D-22O Nine Mile Point Nucloar Stations, Unit 1 
Forwards response to NRC 790119 request for addl info re 
Reload 7 licensing subml tta 1 . Ap p 1 icatlon of normal operating 
limits Is i onservati VB for t oastdoujn. De-s c rlt es Cgcle t> 
startup best. 
SCHNEIDER. R, R. Niagara Mohauik Power Corp. 79/O2/12. 6pp. 

7702200001 DOCKET 50-220 Nine Mile Point Nuclear Stations, Unit 1 
Foruarilfr application for amend to License DPfl-63 & copy of 
proposed changes to Tech Specs. U/entl license amend fee. 
THOMAS, E.B. UeBoeuf, Lamb, Leiby & MacRae. 79/O2/13. 2pp. 

7902200002 DOCKET SO-22O Nine Mile Point Nuclear Stations, Unit 
Application For amend to License DPR-63 covering safety 
limits. IBIS trunenta t i on Initiating scram !< primary coolant 
conta 1 nment isolation. 
DARTLETT.J. Niagara Mohauik Pouar Corp. 79/02/12, 43pp. 



7903SOOOOA DOCKET 50-330 Nine .Mil* Point Nuclear Stations, Unit 1 
Forwards request for eiemption from provision of Section 
?3.33(c) of NRC regulations for specified Interim period. 
Supporting documentation withheld (ruf 10CFR2. 79-0). 
THOMAS, E. D. LcDocuf, Lamb. Loiby & J-lacRae. 79/03/15. 2pp. 

7902230035 DOCKET 5O-2BO Nine Mile Point Nuclear Stations, Unit 1 
Ack receipt of NRC 79O11& Itr requesting Info re raduiaste 
reduction By 5 bij 790316. Will provide responses by 790301. 
BrtRTLETT, J. Niagara Mohawfc Power Corp. 77/03/16. Ip. 

7903150373 DOCKET 50-32Q Nino Mile Point Nuclear Stations, Unit 1 
Re-spntids to 7H1115 Itr. Plans to submit requested amend to 
Tech Spec s. currently under review, by 79O227. 
SCHNEIDEfl.R. f!. Niagara Mohauk Power Corp. 79/O2/09. Ip. 



DOCKETED ITEMS 



7903010840 DOCKET 3O-22O Nine Mile Point Nuclear Stations. Unit 1 
Forwards IE Circular 79-02. "Fa i lure of 120 Volt Vital AC 
Power Supplies. " 

OR1ER.B.H. Region 1. Philadelphia, Office of the Director. 

79/01/16. Bpp. 

790B1301S3 POCKET SO-220 Nine Mil* Point Nuclear Station*, Unit 1 
Accept* mppl info dtd 7B1229 re decision to submit 
guntral revision to FBAR Suppl 12, OA program, by Hay 1979. 
BRUNfJEH. E. J. Region 1. Philadelphia, Reactor Operations Nuclear 

Support Branch. 79/O1/24. Ip. 

7902130154 DOCKET 30-220 Nine Mile Point Nuclear Stations, Unit 1 
Forwards suppl info re Insp Rapt 50-220/70-11: updated 
revision of F3AR Suppl 13. GA program, ui 1 1 be submitted by 
MV 1979. 
SCHNEIDER. R. R. Niagara Mohaufc Poyer Corp. 78/12/39. Ip. 

79O223013B DOCKET 30-220 Nine Mile Point Nuclear Stations. Unit 1 
Responds to IE Bulletin 7S-14 dtd 7B1319. During 1975 outage, 
diajphraoms in all scrampilot valves replaced & since then 
37 addl diaphragms nave been eh angod. Based nn review, all 
diaphragms Si discs shall OB changed during 1979 outage. 
SCHNEIDER, R. R. Niagara Mohawk PouiHr Corp. 79/01/30, 3pp. 

7902130010 DOCKET 30-aSO Nino Ml 1 B Point Nuclear Stations, Unit 1 
Forward* IE Info Notice 79-01 , "Bergen-Patarson Hydraulic 
Shock & Suiau Arresters (HSSA). " 

ORIER.B.H. Region 1. Philadelphia, Office of the Director. 

79/02/03. 2pp. 

7902280491 DOCKET 50-220 Mine Mile Point Nuclear Stations. Unit 1 
Forward* IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment. " W/Hat of It systematic evaluation program 
plants for which no action is required. 

DRIER, D.H. Region 1. Philadelphia, Office of the Director, 

79/O2/08. IP. 



7901E30372 DOCKET 50-237 Drasdan Nuclear Pouier Station, Unit S 
Forward* ASLD 79O109 "Buppl Order RuLinj an Petitlotii to 
Intervene" In Oconee-MtQu i re spont fuel shipment cam. 
Supports- NRC opposition to intervention by NRDC !< Cltiiens 
for Better Environment. Enc 1 availafito in Central Files. 
GODDARD.R.J. Office of the Eaeciitlve- Legal Director 79/O1/12. Ip. 

79020601O4 DOCKET 30-237 Dresden Nuclear Power Btatlpn. Unit S 
NRC response to NRDC's t, Citiiena For a DetteT Environ 
731220 c ontenti on-s. Content i on 9 meets requ i rementB 1 Not! c-o of 
appearance tt Certificate of Sue encl. 

OOLDDEno.a. C, Office of the Eiecutive Legal Dimeter. 77/O1/13. 
19pp. 

7902O6O1HB DOCKET 5O-237 Dresden Nuclear Podier Station, Unit 2 
NRC brief In opposition to admission of certain proposed 
contentions of State of TL re spent fuel atorag a. Dpp oisa 
admission of proponed Contortions 1O laubparts B. 9, & 1OJ, 
11,12H,13A tt 17. W/Cortifieate of Svc. 

QODDARD.R.J. Office of the Executive Legal Director 79/OI/J2. 
7pp. 

7902210196 DOCKET 50-237 Dresden Nuclear Poiuer Station- Unit 2 
Forwards 3AND-1927i "Transport of flad i onur 1 Ides in Urban 
Envirnna: Uorktng Draft Assessment. " Also foruarda 
8ECV-79-311 & 311ft, indicating NrtC view of rapt impact on 
current regulatory policy. W/o enc 1 , 

OODDARD, Ft. J. Atomic Safe-ty and Licensing Dnard Panel. 79/OI/lff. 
2pp. 

7902210091 DOCKET 3O-237 Dresden Nucloar Pouier Station. Unit 3 
Stipulation of content inn 6 by NRC i State of IL & util to 
limit Issues among parti e s. ties erve rights re non-ntinu 1 ated 
content ions. Reid ted e orrei pond enc e, revised contentions & 
Certificate of Bvc end. ' 

OODDARD.R, J. Office of the Ejecutive Logal Director SEKULER, H. N. 
Illinois, State oP, HOWE, J. W. Commoniueal th Edisnn Cn. 79/01/2*. 
9pp. 



7902140129 DOCKET 30-220 Nln Mile Point Nuclear Stations^ Unit 1 
Forwards monthly operating rept for Jan 1979. 
SCHNEIDER, R. R. Niagara Mahaiuk Power Corp. 79/02/07. Ip. 

79O2140I33 DOCKET 50-aSO Nine Mile Point Nuclear Stations, Unit 1 
Monthly operating repfc for Jan 1979. 
PERKINS, T. J. Niagara Mohauik Powar Corp. 79/01/31, 4pp. 

790BO60007 DOCKET 50-224 Univ. of California Rnsearch Reactor 
Requests addl info re license reneuial appl ication. Informs of 
prnndures for submitting security plan, license changes re 
BNH posseision 1 imi ts, requi red upgrading of Tech Specs & 
safety haiards rept. Draft Tech Specs encl. 
REID.R.W. Operating Reactors Branch 4. 79/01/18. &lpp. 

79020A0008 DOCKET 30-224 Univ. of California Research Reactor 
Draft proposed ANSI standard establishes elements in 
research reactor administration for use by mgt in research 
reactor community. 
American National Standards Institute. 7B/O1/31. 22pp. 



7902220177 DDCKET 3O- 237 Dreadon Nuclear Power Station, Unit 2 
Memorandum re State of IL contentions. Hi thdraius Contentions 
10-12,14,10 fc 17 t. submits revised Contentions 3, 10, h 11. 
Related corrnspnndBnc &, stipulation of contentiansi stato laui 
(i Certificate of Svc end. 
SCOTT, W. J. . SEKUUER, B. N. Ill inn! a- State of. 79/01 /B. 25pp. 

79O22301S2 DOCKET 5O-237 Dresden MuclHar Poioor Station, Unit 2 
Notice of appearance of OH Curnilngham on behalf ofl NRC. 
Cortificato of Svc encl. 
CUNNJNOHAMtO.lt. Hearings Division, 79/O2/O9, 3pp. 

7902230106 DDCKET SO-237 Drosden Wucloar POUJBP BtntUn, Unit * 
Foriuards 197Q Annual Rept for utll, 
BHEflEMANN, R. W. Cnmmonuioal th Edlaon o. 79/02/1S Ip 

7902230194 DDCKET 30-237 Dresden Nuc 1 oar Power Bbatlnrt, Unit S 
197B Annual Rept. Hevieujs 197fli fivo year summary of 
operatinns & rngt, fc flnanlcal statainBnt. 
Commonwealth Edison Co. 78/t2/31. 24pp. 



7902220119 DDCKET 30-237 Dresden Nuclear Power Station.. Unit 2 
Informs that TRADOC Pamphlet 33O-30. "Inter service 
Procedures for Instructional Sys Development" referenced in 
NUREQ-0219 i* available in microfiche form from NRC. 
BESAWiW.J. Division of Document Control. 79/01/09. 3pp. 



7903310238 DOCKET 30-237 Dresden Nucloar Power Station, Unit 
Forwards Endorsement 2 to Dinders ED-1 , XD- 1 . EC-3, Xtl-3. EQ-3. 
XB~3,ED-a9. XB-H9, EB-304 XB-00, ED 13. XD-42. EH-43, XB-ta, 
evidencing second ary f Inane is) protection. 
OSTER.J. CommonuBfll th Edison Co, 79/O2/14, I5pp 



7902060331 DOCKET 30-237 Dresden Nuclear Poiuer Station, Unit 2 
Informs NRC of contract ui/Marsh * McLennan to perform fire 
protection svci noted in "Fire Protection Organization of 
Nuclear Plant Fire Protection Functional Re sponaib i 1 iti e s, " 
Poruiardad in NRC 7BOalB Itr. 
NAUOHTON, W. F. Commonweal th Edison Co. 79/O1/31. 3pp. 

7902200043 DOCKET 30-237 Dresden Nuclear Power Station, Unit B 
Formaroi interim security plan for facilities describing 
compensatory measures to be implemented on 790323. Enc 1 
withheld <ref 10CFR2. 790). 
REED, C. Commonwealth Edison Co. 79/02/02. Ip. 

7902280365 DOCKET 30-237 Dresden Nuclear Poiuer Station, Unit 2 
Forwards Revision 4 to modified amended -security plan for 
Dresden it Quad Cities i Revision 3 to modified amended 
security plan for Zion.Encl withheld (ref 1OCFR3.79O), 
LEE.B. Commonwealth Ediaon Co. 79/02/30. Ip. 

7901220374 DOCKET 50-237 Dresden Nuclear Poiuer Station, Unit 2 
Buppl order ruling on petitions to intervene denying 
Intervention by NRDC & NC PIfiO, 
LAZD.R.M. Atomic Safety and Licensing Board Panel. 79/01/09. 



56pp. 



7903360333 DOCKET 30-S37 Dresden Nuclear Power Station. Ui 
Foruiarrfa info on own venting practices. 

DANCE, H. C. Region 3. Chicago, Office of tlie Diroctor 

3pp. 



75/O5/09, 



790214021B DOCKET 3O-237 Dresden Nuclear Power Btfltlon, Unit a 
Forwards binders & sets of divider tabs for use u/NEDD-SlE!0l 
"Mark 1 Containment Program Load Definition Kept, " 
SOOON. L. J. General Electric Co. .Mucloai- Energy Products Div 
79/01/OB. Spp. 

79030H02SO DOCKET 30-237 Dresden Nuclear Power Station. Unit 2 

Formarda corrected Ii reproduced copies of 79011H Itr which 

provided 1 addl info for spent fuel ponl mod. 

JANECEK, R. F. Commonuma J th Edison Co. 79/O1/24. llpp. 

7902210119 DOCKET SO-237 Dresden Nuclear Poiuer Station- Unit 2 
AcV receipt of 7B121B Itr informing NRC of steps taken to 
correct violations noted during lnep on 7BlO10-13:d 1&-I9. 
HIND, J. A. Region 3. Chicago, Safeguards Branch, 79/01/26, 

7902220237 DOCKET 50-537 Dresden Nuclear Power Station. Urvit H 
Responds to 790111 request for review of paper "V-ont 
Clearing During Simulated LOCA In a Mark I BUS Pressure- 
Suppression Bys. " RacommEnd-s acceptance of paper for 
publ i cat ion. 
CRIMES. C. Plant Systems Oranch. 79/O1/31. Sp. 



Ip. 



14 

7903090333 DOCKET 30-237 Dresden Nuclear Power Station, Unit 
Informs of reviled schedule for diesel generator fun d, due to 
eq.uiprm>nt delivery prob lems. New completion date is 790731. 
JANECEK.R.F. Commonwealth Edison Co. 79/03/02. 2pp. 



DOCKETED ITEMS 



7903070086 DOCKET 5O-237 Dresden Nuclear Power Station, Unit 2 
Ack receipt of 781237 Itr informing NRC of steps takep to 
correct violation noted in IE Insp Rept dtd 701200. 
HIND, J. A. Region 3, Chicago, Safeguards Branch. 79/O1/26. 



7903-130147 DOCKET 5O-237 Dresdon Nuclear Pouor Statinn. Unit 3 
Describes 79O202 incident in which several reactor bldg 
blowout panels became detached. Requests approval of 
temporary Tech Spec change to allow operation within 
secondary containment boundary. No haiard mould be created. 
REED.C. CommotnuBalth Edison Co. 79/02/04. 4pp. 



7903230131 DOCKET 50-237 Dresden Nuclear Power Station. Unit 2 . 
Ack receipt of 790117 Itr informing NRC of steps taken to 
correct violations noted in IE Insp Repts 50-1Q/7S-31, 
30-237/70-29 (. 50-349/7B-29. 

DAVIS. A. D. Region 3. Chicago, Fuel Facility & Materials Safty 

Branch. 79/01/31. Ip. 



7902CBQ19S DOCKET 50-237 Dresden Nuclear Power Station, Unit 2 
Submit! Dec 1970 program activity review, comprised of info 
from selected sections of monthly rep t. uj/section on contract 
!< billing status removed. List) meetings held !< provides 
task-by-tasfc activity summary. 

SDBON.L. J. Qaneral Electric Co. .Nuclear Energy Products Div. 
79/Q2/OS. 10pp. 



7902230134 DOCKET 5O-237 Dresden Nuclear Power Station. Unit 2 
Responds to NRC 790103 Itr re violation noted in IE Insp 
Repts 30-10/70-31,50-337/70-39 t, 50-219/70-29 on 731113-17, 
21-22. Correct! ve actions: neui procedures reviewed & 
reemphasi led. 
FiEED, C. Commonwealth Edison Co. 79/01/17. 3pp. 



7902130206 DOCKET 30-237 Dresden Nuclear Pouer Station, Unit S 
Responds to NRC 7B1221 request for verification of info re 
systematic evaluation program Topic V-l 1. A, "Requirements 
for Isolation of High ti Lou Pressure Systems. " Provides info 
requested. 
JANECEK.R.F. Commonwealth Edison Co. 79/02/09. 4pp. 

7902J4Q20S DOCKET 30-237 Dresden Nuclear Power Station, Unit 2 
Inform* of decision not to convert to std Tech Specs. 
Conversion would be a significant time !< manpower burden 
u/no compensating increase in safety or efficiency. 
REED.C. Coiwnonueal th Edison Co. 79/02/OB. 3pp. 



7903130034 DOCKET 30-337 Drosden Nuclear Power Station, Unit 2 
Forwards IE Info Notice 79-01. "Burgen-Paterson Hydraulic 
Shock d Busy Arresters (HSSA)". 

KEPPLER.J.Q, Region 3, Chicago. Office of the Director. 79/02/03 

IP. 

7903310220 DOCKET 50-337 Dresden Nuclear Power Station, Unit 2 
Forwards IE Bulletin 79-01, "Environ Qual i Citation of Class 
IE Equipment. " M/list of 11 systematic evaluation program 
plants for which no action is required. 

KEPPLen.J.O. Region 3, Chicago, Office of the Director. 79/02/09 

Ip. 



790226O3O7 DOCKET 30-337 Dresden Nuclear Pouer Station, Unit 2 
Forwards draft evaluation of systematic evaluation program 
Topics V-10. B, V-ll. B tc Vll-3 re safe shutdown sys. Requests 
confirmation or correction of facts within 30 days. 
ZlEHrtNW. D. L. Operating Reactors Branch 2. 79/03/09, 100pp. 

7902220033 DOCKET 50-337 Dresden Nuclear Pouir Station, Unit 3 
Responds to 790103 request For addl info !. forwards info re 
projected number of spent fuel assemblies to be shipped from 
Dresden to Quad-Ci t ies. possib le truck routes t. population 
along routes. Info an rail routing will be sent. 
JAHECEK.R.F. Commonwealth Edison Co. 79/03/13. 4pp, 

7903220033 DOCKET 30-237 Dresden Nuclear Power Station, Unit 2 
Responds to NRC 79QIO3 request t. forwards info re projected 
number of spent fuel assemblies to be shipped from Dresden 
to Quad-Cities, possible truck routes b population along 
routes. Info on rail routing will be lent. 
JANECEK.fi, F. Commonwealth Edison Co. 79/03/13. 4pp. 

7902240431 DOCKET 50-237 Dresden Nuclear Power Station, Unit 2 
Requisti change in Licenses DPR-2, OPR-17 V DPR-35, Forwards 
proposed changes, Of Paite Dose Calculation Manual required fly 
NF)C 701113 Itr !, discussion of principal differences from 
NF1C guidelines for manual development. 
REED.C. Commonwealth Edison Co. 79/02/16, flOpp, 

79022604*12 DOCKET 30-237 Dresden Nuclear Power Station, Unit 2 
Qffsite Dos? Calculation Manual for Dresden Station. 
* Commonwealth Edison Co. 79/02/23. l0pp. 

790S360010 DOCKET BO-237 DreidBn Nuclear Power Station. Unit 2 
Forwards IE Insp Rspts 50-010/73-32,30-237/78-30 d 
50-Bfl9/7a~30 on 791O31-1103 tc 1139. 

DAvIB.ft, B. Region 3, Chicago, Fuel Facility t> Materials Safety 

Branch. 79/01/10. 3pp. 



7902270233 DOCKET SO-237 Dresden Nuclear Power BtatioiU Unit 3 
Forwards IE Info Notice 79-O3. "Limi torque Valve Geared 
Limit Switch Lubricant." 

KEPPLER, J. 0. Region 3. Chicago, Office of the Director. 79/02/09 

Ip. 

7902090343 DOCKET 5O-337 Dresden Nuclear Power Station, Unit 2 
Forwards LER 79-004/03L-0, 
0TEPHEN80N. B. D. Commonwealth Edison Co. 79/01/31. Ip. 

7902090344 DOCKET 30-337 Dresden Nuclear Power Station. Unit 3 
LER 79-004/03L-0 on 79O111:LPCI sys full flow test valve 
rid- 2-15Q1-38D failed while securing "D" LPCI pump. Caused by 
broken pinion gear on valve operator motor shaft. 
Commonweal th Ediaon Co. 79/01/34, Ip. 

7902060213 DOCKET 5O-337 Dresden Nuclear POWBT Station. Unit 3 
Forwards LER 79-001/03L-0. 
BTEPHENSON, n. B. Commonwealth Edison Co. 79/01/31. Ip. 

7902060219 DOCKET 30-237 Drosden Muclear Power Station, Unit 2 
LEH 79-001/03L-0 on 790103; torus level increased to -1 Inch, 
due to repetitive starts of HPC1 turb ine. Increase in torus 
level determined to be result of inadequate procedure. HPCI 
surveillance procedures to be amended. 
KQflCHYNSKY, M. Commonwealth Edison Co. 79/01/31. Ip. 

79020fi02fll DOCKET 30-237 Dresden Nuclear Power Station, Unit 2 
Forwards LER 79-003/03L-0. 
STEPHENBON, Q. D. Commonwealth Edison Co. 79/01/31. Ip. 

7902060344 DOCKET 30-337 Drosden Nuclear Power Station, Unit 2 
LER 79-003/03L-0 on 79O109; PS 3-1430-1466D tripped at 
103 psi. Caused by instrument drift. 
L1NDDERO,C, Commonwealth Edison Co. 79/01/31. Ip. 



7903E60012 DOCKET EO-337 Dresden Nuclear Power Station, Unit 3 
IE In*o Repts 50-010/70-3B, 50-337/76-30 t. 50-249/70-30 on 
7B1031-I103 !. 1129. No items of noncomplianco noted. Major 
areas lnsp:ngt controls, environ protection programs t< 
internal audits. 

DESTMAN.M. J, , JANUSKfl, A. 0. . GRANT, W. D, Re 9 lon 3, Chicago, Fuel 

Facility b Materials Safetg Branch. 79/01/OB. 9pp. 

7902260030 DOCKET 50-337 Dresden Nuclear Power Station, Unit 2 
Forwards IE Inap Repts 30-010/78-33,30-237/76-31 ti 
30-2fl c ?/7a-31 on 7QI 101-1201 It notice of violation. 

FIORELL1.0. Region 3, Chicago. Reactor Operations Nuclear Support 

Branch. 79/01/13. 2pp. 

7902240034 DOCKET 30-237 Dresden Nuclear Power Station. Unit B 
Notice of violation from insp on 7S110I-761201. 

* Region 3, Chicago. Reactor Operations Nuclear Support Branch. 

79/01/09. Ip. 

79032600A6 DOCKET 30-337 Dresden Nuclear Power Station. Unit S 
IE In*p Rept* 50-OJO/7B-33. 50-237/79-31 & 30-349/70-31 on 
7EH101-120I. Noncompllance noted; fai lure to follow temporary 
procedure change & failure to perform a surveillance, 
KMOP.R.C., BARKER, J. L. , SMITH. J, Region 3, Chicago, Office of 

In* Director. 79/01/09. 15pp. 



7902220011 DOCKET 30-337 Drosden Nuclear Power Station. Unit 2 
Forwards LER 79-OOB/O3L-0. 
STEPHENSDN, B. D. Commonwealth Edison Co. 79/02/09. Ip. 

7903220013 DOCKET 30-237 Dresden Nuclear Power Station, Unit B 
LER -79-008/03L-0 on 79012i; LPCI min flow value 
MO-2-1301-13A failed to close completely during LPCI pump 
operabllity surveillance. Cause of failure unknown. 
ACHTERDERO, J, Commonwealth Edison Co. 79/02/09. Ip. 

7902220036 DOCKET 30-337 Dresden Nuclear Power Station, Unit 2 
Forwards LER 79-003/03L-0. 
STEPHENSON, 0, D. Commonwealth Edison Co. 79/02/09. Ip. 

790223003B DOCKET 30-237 Dresden Nuclear Power Station, Unit 2 
LER 79-003/03L-0 on 790119: during normal operation, mass 
spectometer leak detector downscale condition annunciated t, 
high rod alarm & half scram occurred twice on same day. Log 
rad monitor replaced. 
LINDQERO, C. Commonwealth Edison Co. 79/02/09. tp. 

790226033B DOCKET 50-537 Dresden Nuclear Pouier Station. Unit 2 
Forwards LER 79-010/01T-0. 
STEPHEN90N, B. D. Commonwealth Edison Co. 79/OS/14. Ip. 



DOCKETED ITEMS 



16 



79022&O3&1 DOCKET SO-237 Dresden Nuclear Power Station. Unit 
LER 79-010/01T-0 on 790202: sec tion of blouout panel b 1 oum 
out, breach ing secondary c ontainment. Cause under 
Inval tlgat Ion. 
CHAN, J, Commonwealth Edison Co. 79/02/16. 2pp, 



7902270341 DOCKET 50-337 Dresden Nut IB a 
Forward* LEFJ 79-009/O3L-0, 
aTEPHEHBON. B. B Coromonmeal th Edison Co. 



Power Station. Unit 2 



790BB7O3Sa DOCKET 30-237 Dresden Nuclear Poiuer Station, Unit 2 
LEU 79-009/03L-0 an 79O121: plant chimney sampling 91,9 
operating incorrec tig. Caused by purge valve V2 being stuck 
open. 
CHANj J. Commonwealth Edison Cn, 79/O2/2Q. 3pp. 

7903140474 DOCKET BO-237 Dresden Nuclear Pouer Station, Unit 2 
Transcript of 790201 prehoaring conference held In 
Chicago. IUj re petitions to Inter venE. Pp 1-90. 
MILHDLL1W, Q. Atomic Safety and Licensing Board Panel. BTDBER.Q. J. 



Mashing tan, Univ. 
79/02/O1. 90pp. 



of. 



JOHNSON, E . B. 



Oak Ridge National Laboratory, 



77022H0119 DOCKET 5O-244 Robert Emmet Qlnna Nuclear Plant, Unit I 
Informs that TRADOC Pamphlet 350-30. " Interservice Procedures 
For Iniruetional SU.B Development" referenced in NUREG-0219 
ii available in microfiche form tram NRC. 
BESAWjW.J. Division of Document Control, 79/01/09. 2pp, 

79O12300O3 DOCKET 30-244 Robert Emmet Oinna Nuclear Plant, Unit 1 
Foriuardi NUREO/CR-0400r "Rislr Assessment flevieui Group Rent to 
thi US NKC"<Lewi Rep t), providing recommendations for uo o-f 
riik aBsmmant methodology tt assessment of WASH-MOO. W/n 
unel, 
KETCHEN.E. 0. Office of the Executive Legal Director. 79/01/1A. 

7902210251 DOCKET 50-244 Robert Emmet Ginna Nuclear Plant, Unit 1 
. Foriuardi Amend 39 to Indemnity Agreement NF-170. listing 
subscribing companies & proportion of participation in 
Nuclear Energy Liability Insurance pool effective 770101. 
WHITE, L. D. Rochester Oas & Electric Corp. 79/02/14, 3pp. 

790202017A DOCKET 30-244 Robert Emmet Oinna Nuclear Plant, Unit 1 
Responds to 791221 Itr requnating verification of data 
submitted by utl 1, Forwards comments & aildl info re isolation 
of lou pressure su from reactor coolant sya. 
WHITE, L. D. Rochester Gas & Electric Corp. 79/01/25, Spp. 

7902130457 DOCKET 50-244 Robert Emmet Oinna Nuclear Plant, Unit 1 
Requeati addl info re boron dilution ace idonts. Response of 
790110 addressed only one aspect t, is insuf f ic ient. Requi res 
Analysts or schedule far analysis of each previously 
undocumented boron d Hut ion accident, 
ZIEMANN, D. L. Operating Reactors Branch S. 79/01/2S. Epp, 

7903210011 DOCKET 30-3-44 Robert Emmet Oinna Nuclear Plant, Unit 1 
Forwards Amend S3 to DPR-ia, safety evaluation & notice oF 
Issuance. 
ZIEMANN, D. L. Operating Roactore Branch 3. 79/01/3O. 3pp. 

7902310017 DOCKET 50-244 Robert Emmot Oinna Nuclear Plant, Unit 1 
Amend 23 to DPR-18. Mod 1 do s App A Tech Specs to allow change 
in sampling frequency for secondary coolant t. to reduce 
limit on iodine activity in secondary coolant. 
ZIEMANN. D. L. Operating. Reactors Branch 3. 79/01/30. 10pp. 

7902210022 DOCKET 50-244 Robert Ernmut Oinna Nuclear Plant, Unit 1 
Safety evaluation supporting Amend S3 to DPR-1S. 
* Office of Nuclear Reactor Regulation. 79/01/30, 4pp. 



7903310326 DOCKET 50-344 Robert Emmet Oinna Nuclear Plant, Unit 1 
Forwards review of safety actuation circuits u/manusl 
override. Reset operation tfoei not prevent equipment from 
op*rat Ing, tohlch is necessary to mitigate a postulated 
accident. 
WHITE, L. D Rochester Oas !< Electric Corp. 79/02/li. 6pp 

7902230174 DGCKET 30-244 Robert Emmet Oinna Nuclear Plant, Unit 1 
Forwards application For amend to operating license., 
documents re technical oasis for change I< *4. OOO check for 
required fee. 
LARSON, L. K. LcBaeuf, Lamb, Leib-j & MacRae 79/O2/23 lp 

7902230179 DOCKET 5O-244 Robert Emmet Binna Nuclear Plant, Unit 1 
Application for amend to operating license DPR-1B to 
implement 10CFR50 requirements & modify radioactive effluent 
requirements. Beta 1 1 ed Tocfi Spec change, jusli f i cat i nri for 
q IBBE! fixation It Car ti f icata- of Svc end. 
WHITE, L. D. Rochester Gas & Electric Corp 79/02/14. 72pp 

7902200233 DOCKET 50-S44 Robert Emmet Oinna Nuclear Plant, unit 1 
Ack receipt of NRC 79O125 Itr requesting sunpl of 7BOLIO 
analysis by util re potential boron dilution incidents at 
facility. Analysi s i>s scheduled fnr completion by 790501. 
WHITE, L, D. Rochester Gas tt Electric Corp. 79/O2/23. If 

7902O101B3 DOCKET 50-244 Robert Emmet Ginna Nuclcdr Plant- Unit 1 
Forwards IE Inap flept 50-24t/7B-37 on 7Q1206-OB 
No noncomp 1 iance noted. 

BRUNNEH.E. J. Region 1, Philadelphia, Reactor Operations Nuclcnr 

Support nranch, 7B/12/22. Spp 

79020101H4 DOCKET 50-34-1 Robert Emmot Oinna Nuilear Plant, Unit I 

IE Insp Rcpt 50-214/70-37 on 781206-03. No uoncomp 1 iance 
lp. noted. Major areas irtBpBcted:Pacilitij logs.rocordH fc plant 

Btatuaj status of previous outstanding ktetnsi b 
qualification of stem-mounted limited switches 

DECUMAN, D. A. , DAVNDND, H. J. , KElMIO,n.fi. Regipn 1, Philadelphia, 

Reactor Operations Nuclear Sirpport Branch. 7H/12/E3. 9pp. 

790301027S DOCKET 5O-244 llobc-rt Emmet Ginna Nuclear Plant, Unit 1 
Forwards IE Circular 79-03, "Fa i lure of 130 Volt Vital ftC 
Power Supplies " 

GRIER.G.ff. Region 1, I'h i Ind e Iph i a, Office a? the Director. 

79/O1/16. Qpp. 

79Q2OSOQ73 DOCKET SO-244 Ilobort Emmet Oinna Nuclear Pbant, Unit 1 
Ack receipt of 701339 Itr informing NRC nf steps taken to 
correct violations noted In IE Inap [lept 30-24'3/7Et-HiJ 

IlRUNNER.e. J, Region 1. Philadelphia, React or Oporo 1 1 orm Nuc 1 oar 

Support Dranch. 79/01/19. lp. 

79OH080UBO DOCKET 90-S44 Robert Emmet Oinna Nuclear Plant, Unit 1 
Responds to NRC 7B1EO6 Itr re violation noted in IE Insp 
Wept 30-244/73-24. Corrective Actions: radiographs removed 
from cardboard filing boxes t, placed in fire rotod t.ablneta 
It rocord storage room added for nondup 1 i ca to rootrdo 
WHITE, U D. Rocheater Oas (i Electric Corp. 7B/12/S'/. 3p p 

79020SOOB4 DOCKET 30-244 Robert Emmq t Oinna Nuclear Plant, Unit 1 
Forwards IE Inup Rapt 50-244/73-34 on 7aiJ13-l(, fc notice of 
violatl on. 

DHUNNER.E;. J. Region 1, Philadelphia, Reactor Operations Nuclear 

Support Branch. 7B/13/06, 2pp. 

770a0900E38 J3DCKET 5Q-3W Robert Emmrat Oinno Nuclear f'lamt, Unit 1 
Notice of violation Prom insp on 731113-16, 

HARKQU9KI.R. S, , NAPUDA, 8. Region 1, Philadelphia. Office op the 

Director. K1BTEFI. H. Heoion 1, Phi lad elnh is, Hoactnr Operation* 

Nuclear Support Dranch. 7B/12/05, lp. 



7902310027 DOCKET 50-244 Robert Emmet Oinna Nuclear Plant. Unit 1 
Notice of issuance of Amend 23 to DPR- IB modifying App A 
Tich BpBc. 
ZIEMANN, D. L. Operating Reactors Branch 3. 79/01/3O. Spp. 

790H090327 DOCKET SO-214 Ifobort Emmet Oinna Nuclear Plant, Unit 1 
Forward 1 * ECC8 reevaluation. Corrac ts Zr-uoter reactor error & 
fulfill* all requirements itated in 7B05O1 eiemption from 
roquirenmnts of 10CFRSO. 46(a M 1 ), 
MHITE.L.D. Rochester Oas t. Electric Corp. 79/02/03. 6Opp. 

7902200034 DOCKET 30-244 Robert Emmet Oinna Nuclear Plant, Unit 1 
Forwards list of piping lines inside containment uhlch 
normally or occatlonally eiperlence: high energy we 
condi tlont. Distinguishes lines which do not need to be 
considered for iystematlc evaluation program Topic III-5. A. 
WHITE.l,. D. Rochester Oas b Electric Corp. 79/02/09. 4pp. 

770Z210190 DOCKET 50-244 Robert Emmet Oinna Nuclear Plant. Unit 1 
Forwards info re arrangement tt actuation logic for 1C safety 
Injection pump. Reports that logic arrangement meets 
partition & single failure criteria. 
WHITE.L, D, Rochester Oa d Electric Corp. 79/02/13. 2pp. 



79020H0091 DOCKET SO-244 Robert Emmot Oinna Nuclear Plant, Unit ] 
IE Inap. Ropt 5O-244/7B-24 on 781 1 13-1&. Noncompl loiue notod: 
single type records stored in locations uhieh did nut meat 
storage facility phijeleal feature requirpmonts. BBC orda 
involved luere radiographs (, oporations recorder charts. 
MARKOH3KI.fi. 8. , NAPUDA* Q, Region i, Philadelphia. Office of tho 

Director. KIBTER. H. Region 1, Philadelphia, Reactor Operations 

Nuclear Support Brancli. 7B/1E/05, 14pp. | 

7902130001 DOCKET ^0-344 Robert Emmet Ginna Nuclear Plant, Unit I 
Forwards IE info Notice 79-01 , "Dergen-r'ateraon Hydraulic 
Shock tt Suay Arrcators (HSSA). " 

GR!ER,B. H. Region 1, E'Jii lod elph i a. Office of the Dircttor 

79/02/02. lp. 

7902SH050S DOCKET SO-H44 Robert Emrnet Oinna Nucloer Plant, Unit I 
Forwards IE Bulletin 79-01. "Environ Qual ( P ication of Cla-s* 
IE Equipment," U/liet of 11 systematic evaluation program 
plants for which no action is required. : 

DRIER. D, H, Region 1. Phi ladelpMa, Offlcr of the Director- 

79/OS/08, IP. 



16 

790223011'? DOCKET 50-245 Millstone Nuclear Power Station, Unit 1 
Informs that TRADOC Pamphlet 350-30, "Interservice Procedures 
for Instructional Sys Development" referenced in NUREG-0219 
ia availaole in microfiche form From NRC. 
BEBAU.W J. Division of Document Control 79/01/07. 2pp. 



DOCKETED ITEMS 



7903ISOI37 DOCKET 50-345 Millstone Nuclear POULT Station, Unit 1 
Forwards proposed corrections to NRC info on nystomatlc , 
evaluation program for high/low pronauro ays Isolation. 
Changes involve reactor coolant sys data. Including water 
cleanup sys, ECC8, sampl ing SUB t. reactor vessel head spray. 
CDUNSIU.W 0. Northeast Utilities. 79/O1/30. 4pp. 



79O2O70087 BDCKET 50-213 Millstone Nuclear Power Station, Unit 1 
Forwards NRC position re deficiency in modified amended 
security plans to provide opportunity for util to 
incorporate suggested addition. Reviews appeal pi-ucoss. 
Details withheld (i-ef 10CFR2. 790). 
ZIEMANN. D.L. Operating Reactors Branch 3. 79/O1/23. lp. 



7903220297 DOCKET 50-243 Millstone Nuclear Power Station, Unit 1 
Responds to 79O1 1 1 request for review of paper "Vent 
Clearing During Simulated LtJCA in o Mark I DWfl 
Pressure-Suppression Gya. " Recommends pnpHr be occnpted for 
publication. 
CRIMES, C. Plant Systems Oronch. 79/O1/31. 5pp. 



79Q22B0455 DOCKET 50-345 Millstone Nuclear Power Station, Unit 1 
Requests eddl info re financing of refueling outage bldg 
const. U/encl questionnaire. 
ZIEMANN. D. L. Operating Reactors Dranch 3, 79/01/22. 4pp. 

7902330092 DOCKET 90-345 Millstone Nuclear Power Station, Unit I 
Forwards Endorsement 52 for Policy MF-52, effective 790101. 
6EQER.R. M. Northeast Utilities. 79/02/06. 3pp. 

7902130167 DOCKET 30-345 Millstone Nuclear Power Station, Unit 1 
Forwards certified copies of Endorstment 57 to Policy NF-173 
re premium t. amend of Condition 4 for 1979. 
SEGEft.R. M. Northeast Utilities. 79/02/06. 2pp. 

7903200067 DOCKET 30-245 Millstone Nuclear Pouer Station, Unit 1 
Forwards Endorsement 2 to NELIfl Hinder EB-13, Efl-16, XB-15 b 
XB-16 for calendar year 1979. eitending binder protection 
through 1979. 
BEGER.fi. M. Northeast Utilities. 79/03/09. 9pp, 



7902330077 DOCKET 30-245 Millstone Nuclear Power Btation, Unit 1 
Forwards draft evaluntian of systematic evaluation program 
Topic V-tO. A. Requests eiaminiitlon of facts t< response by 
confirmation or Idontlf ication of errors, 
ZIEMANN, 0. L. Operating Reactors Dranch 3. 79/01/31. 7pp. 

7902120JB9 DOCKET 50-345 Millstone Nuclonr Pouer Station, Unit 1 
Forwards proposed revisions to Environ Tech Specs submitted 
7B0203 & 781020. Requests portions not affected by proposed 
radiological effluent changes be reviewed separately, 
CDUNBIL. U. G. North ons t Utilities. 79/02/02. 6PP, 

7902030193 DOCKET go-HflS Millstone Nuclear Power Station. Unit 1 
Submits Dec 1970 prugrnm activity vovi BUJ, c omprlsed of info 
from selected section* of monthly rnpt, w/nectlon on contract 
t< billing status removed, Lists meetings hold !< provides 
taik-by-task activity summary. 

BODGN.L.J, Oenoral Electric Co,.Nucloar Energy Products Dlv. 
79/02/03. 10pp. 



7902260343 DOCKET 50-245 Millstone Nuclear Power Station, Unit 1 
Forwards summary of BHH purging 6 venting eiperiencos. 
BRUNNEH.e. J. Region 1. Philadelphia. Reactor Operations Nuclear 

Support Branch. 76/05/12. 3pp. 

7902I4021S DOCKET 50-245 Millstone Nuclear Power Station, Unit I 
Forwards binders Ii sets of divider tabs for use ui/NEDD-31BQQ 
"Mark 1 Containment Program Load Definition Rept. " 
SDBDN.L. J. General Electric Co. .Nuclear Energy Products Div. 
79/01/03. Bpp. 

79O2OI0189 DOCKET 30-245 Millstone Nuclear Power Station, Unit 1 
Forwards Amend SB to License DPR-31, saf etij evaluation !i 
notice at issuance. 
Z1EHANN.D. L. Operating Reactors Branch 2. 79/01/12. 3pp. 

7903010190 DOCKET 30-349 Millstone Nuclear Power Station, Unit 1 
Amend 5S to License DPR-21 changing Tech Specs to revise the 
sitpoint for tne suppression chamber to reactor bldg vacuum 
breakers. W/cnc 1 Tech Specs revision. 
ZIEMANN.D, L. Operating Reactors Dranch 2 79/01/12. 5pp. 



7902010193 DOCKET 50-249 Millstone Nuclear Power Station, Unit 1 
Bafetg evaluation in support of Amend 5Q to License DF'R-21, 
reviling Tech Spec setpoint for certain vacuum breakers. 
* Offtc of Nuclear Reactor Regulation. 79/01/12. 2pp. 



79O2Q10I95 DOCKET 30-245 Millstone Nuclear Power Station, Unit 1 
Notice of Issuance of Amend 59 to License DPR-21. 
WAMBACH.T. V. Operating Reactors Dranch 2. 79/01/13. 2pp. 



7902150339 DOCKET 90-249 Millstone Nuclear Powtr Station, Unit I 
Ack receipt of 731222 Itr re NRC petition on foe 
requirements for nmenda to implication proposing chanaas to 
ETB b Safety Tech flpecs. Ac tlon lino tieun (Inferred by NRC so 
previous foo payment IB inappropriate. 
COUNSIL, U. 0. North eat* Utilities. 79/03/06. lp. 

7902150336 DOCKET 30-243 Millstone Nuclear Power Btation, Unit I 
Ack receipt uf 7BQH03 Itr re proposed minor changes ta 
ETB, Action to bo deferred on,re>;uont because implementation 
of App 1 Tech Specs will cover Item* proposed. 
ZIEMANN. D. L. Operating Reactors Drancli 2. 7Q/U/05. lp. 

7902I903S9 DOCKET 30-249 Millstone Nuclear Power Btntion, Unit I 
Forward! App 1 mad el Tech fipoci intended to provide Quldanti 
re equipment fc ndmlnistrative requirement! specs. Request! 
null mitt Bl of license amend application reflecting applicibli 
i(i PCI M/o end. 

CRIMES, U.K. Assiilunt Biroctor for Ennlneers t< Projects. 

7B/07/11. lp. 

7903260411 DOCKET !)0-ai3 Millstone Nuclear Power Btntion. Unit I 
Responds to NftC 790116 Hr, Draft of yat>matic evaluation 
program Topic W.I. A Is correct re unit d no ion 
CDUNBIL. U. 0. NnrUienst Utilities, 79/OH/1B. lp, 

7902210234 DOCKET 50-243 Millstone Nuclear Power Station, Unit 1 
Inform) that requested lubmlltal date of 790213 for 
radlalosUal effluent Tech Specs cannot uu achieved due to 
teveral specified raainns. Tech Bpcce will be ready 790309 
for Unit 1 (. 7703H3 for Unit H. 
COUN8Il.,W, 0. Northeait Utilities. 79/02/13. 2pp. 



79O2OI0156 DOCKET 50-245 Millstone Nuclear Power Station. Unit 1 
Understands that faulty const of compacted spent fuel racks 
allows mater to react w/matl in rock uall.Asks if venting is 
designed to alleviate problem. ! If so, why "band-aid" 
solution uas adopted, 
CLEAHY.P, Citliens for a Better Environment. 79/01/24. lp. 



7902140367 DOCKET aO-H4S MllUtone Nuclear Power Station, Unit 1 
Forwards IE lnp Rapls 80-349/70-37 t< 30-336/70-34 on 
7B1204-OO.ND noncompl ioniB noted, 

CARLSON, fi, T, Region 1. Phlladelph In, Reactor Construction fc 

Engineering Support Dronch. 70/12/20, 2pp, 



7902030079 DOCKET 50-249 Millstone Nuclear Pouicr Btation, Unit I 
Forwards summary of repor table indlcatioriH for feedwator 
noiilel>rept by Nuclear Technology, Inc, "Fatigue Evaluation 
of Eiistlng Feedwater Hoi i le/Bparger Design," t< chart of 
cceptance criteria to be usnri for insp program. 
CDUNSIL.W.O. Northeast Utilities. 79/01/56. 4pp, 



790214037Q DOCKET 50-24S MllUtono Nuclenr Power Btatton, Unit 1 
IE Imp fiupts 30~24U/70-37 fc '50--336/70-34 on 701204-08. No 
noncompliance noted. Major nreas insp:nptnt fuel rack mod 
ineludina procurement. receipt, installation, testing & 
procedural controls. 

FAQANOrA.N., FEIL, H, A, , EBNETER.B.D. Region 1. Phi lsdelphi, 

Reactor Construction . Engineerino Support Branch. 7B/1H/S2 Iff 



79020500B3 DOCKET 50-249 Millstone NuclBar Power Btatioti, Unit 1 
"Fatlque Evaluation of Eilsting Feeduater Noi i le/Bpargor 
Deiign. " Concludes that postponement of in-reactor liquid 
penitraiit eiam of nonles beyond Spring 1979 refueling 
outage is warranted. 

TANQ.S.S., RICCrtRDELLA, P. E, EDWARDS, ft. W. Northeast Utl 1 Itlco, 
NEU-01-003. 79/01/19. 23pp. 



> 1 790215010 I ? DOCHET 30-345 Millstone Nuclear Pouier Btation. Unit 1 

aru of 790111 meeting In Det!*esda,MD re program for 
.f*duter sparger during refueling outage beginning 7904SB. 
1960 outage also discussed. HRC rccomnendtd several specific 
;lt*mi to bi addressed In forthcoming rept. 
'SHEA.J.J. Operating Jioactors Branch 2. 79/01/39. 5pp. 



7902010370 DOCKET 50-249 Mlllitone Nucloar Pouflr Station. Unit 1 
Forwards IE Circular 79-02, "Failure of 120 Volt Vital AC 
Power Buppl 1 e>, " 

oniER.O, H, llegion 1. Phi ladelphioi Office of the Director, 

79/01/16. Bpp, 

7903000064 DOCKET BO-343 Millstone Nuclear Pomer Btation. Unit 1 
Ack receipt of 7015B2 Itr Informing NRC of steps taken to 
correct violation* noted In IE Insp Repts 90-243/7B-H9 i 
30-336/70-24. 

BRUNNEftiE. J. Realon 1. Philadelphia. Hone tor Operations Nut leir 

Support Branch, 79/01/24. lp. 



DOCKETED ITEMS 



17 



790aOBOOc,9 DOCKET 30-243 Millstone Nuclear PQUBP Station, Unit 1 
Rtepondl to NRC 7B1023 Itr rt violations noted In IE rnsp 
Repts 80-243/79-39 b 5O-33i/7B-24. Correc 1 1 ve actions; *td 
rscaution entered in all tij procedure! when equipment 
responds to an accident li^nnl, 

CQUNBILiH.O. Northeast Nuclear Energy Co. (Northeast Utilltln-sl 
78/12/22. Bpp. 



7902210070 DOCKET 5O-B47 Indian Point Station, Unit 3 
Discusses Fire protection guidelines summary of mads, 
evaluation of plant features 6 specific plant areas 
administrative control s . Tet h Specs 6 consultant rept. Finds 
amend ace eptab IE 
* Office at Unclear Reactor Regulation. 79/O1/31. 49pp. 



7902130022 DOCKET 30-245 Millstone NucleoT Pouer Station. Unit 1 
Forward* IE Info Notice 79-01, "BBrgen-Paterson Hydraulic 
Shock d 8W4U Arrestnr* CHSfiAl." 

OR1ER, B. H. Region 1, Philadelphia, OfFice of the Director 

79/02/03. 3pp. 

79Q2SBQ477 DOCKET 50-245 Millstone Nuclear Pouer Station, Unit t 
Forward! IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment." H/Hs,t of II systematic evaluation program 
plantc for which no action It required. 

CRIER, B.H. Region 1. Philadelphia. Office nP tho Director 

7 f /OS /OB. 2pp. 

7902370261 DOCKET 30-245 Mnistono Nuclear Pounr Station, t/nit 1 
Foruiards monthlg operating rept For Jon 1979 
OPEKA, J. f. Nor t fin a t Utilities. 79/Q2/19. lp, 

7902H70265 DOCKET 80-245 Millstone Nuclear POUBF Station, Unit 1 
Monthli) operating, rapt for Jan 1979. 
YQUN9, R. Northeast Utilities. 79/Oa/OB, 7pp. 



7902310071 DQCKET 50-247 Indian Point Station, Unit 2 
.Notice of issuance of Amend 44> to Li tense QPR-34. 
TRAflMELL, C. M. Operating Reactors Dranch L. 79/O1/31. 



79033iOOBa DOCKET 50-247 Indian Paint Station. Unit 2 

Requests addl Bum of SBQO. 00 for Class 1 duplicate Fee for 

amend to Units 5 fc 3 ETS. 

DIGQS, fi.M. License Foe Manaocmant Branch. 79/Q2/O2. lp. 

790226040B DOCKET 50-247 Indian Point Station, Unit a 

RenuBsti add I sum of *OQO far Class 1 duplicate Fee for 
amend to Un:iU 5 fc 3 ETB. 

DIGQS, R. M, License Fee Management Bran-ch. 79/03/O2. lp. 



7903150319 DOCKET 50-347 Indian Point Station, Unit 2 

Forwards application for amend to license u/proposed Tech 
SpecB changes, saf Btu evaluat inn, f- repts entitlBd "Support 
BIJS Redesign for Piping Suns on North Ha]f of Cotita inment" b 
"Piping BUS Shock Suppression Removal Study." 
CAH1LL.M. J. Consolidated Edison Co. oP New York. 79/03/09. 



2pp. 



7903030103 DOCKET 3Q-H4S Millstone Nuclear Pouuer Station, Unit t 
Forward* LER 7B-032/O3L-O, 
DPEKA. J. F. Northeait Utilities. 79/O1/2S. lp. 

7902030109 DOCKET SO-34S Millitone Nuclear Power Station. Unit 1 
LEU 7S-03S/03L-0 on 701237: d lesel fire pump fuel oil sample 
itirvei t lance inadvertently overlooked during routine survey 
of completed *urvei 1 lancos. Not on surveillance schedule. 
Bubeq.untlij added to schedule. 
VOUNO. R. H. North eaflt Utilitiei. 79/O1/25. 3pp. 

79021 30 lii DOCKET 30-215 Millstone Nuclear Pouter Station. Unit 1 
Fnrwrd't LER 79-002/03L-0. 
OPEKA, J. F. Northeast Utilities. 79/02/06. lp. 

79021301H7 DOCKET 30-243 MUUtone Nuclear Pouier Station, Unit 1 
LEfi 79-OOS/Q3L-0 on 79O1O7: reac tor low water level signal 
Tttultcd from failure of "rt" ntandbu gas treatment BU.S. 
Cauied by ffli*l ignmeTit oP movable contact cover on relay 
that itrts "A" it und by ga treatment aijo, 
YDUMO.R.H. HorthaEt Utilitla.. 79/02/OA. 3pp. 

7902130146 DOCKET 90-345 Millstone Nuclear Pouer Station, Unit 1 
Forward* LER 79-003/O3L-0. 
OPEKA, J. F. Northeait Utilities. 79/03/07. lp. 



7903190321 DOCKET 50-347 Indian Point Station. Unit E 

Appllcatian for amend to License DPR-36 changlnfl Tch Specs 

re redesign of support ays of tertian safety-re latetf pipe 

lines. Tech Specs page revisions, safety evaluation !< 

Certificate oP Bvc end. 

CAHILL.H.J. Consolidated Edison Co. of Neu York. 79/02/O9. 35pp. 

7902150324 DOCKET 50-347 Indian Point Btation, Unit 2 
"Support Sys Redesign For Piping Runs on North Half of 
Containment " 

* Consolidated Edison Co. of New York. NYCI-78-Q05 79/01/31. 
35pp. 

79O213032B DOCKET 5Q-247 tndia-n Point Station, Unit S 

Rept 03-00101, Revision O, "Piping Sys Hydraulic Shock 
Suppressor Removal Study," & Ropt O3-00103, Bevl s inn 0: 

"Piping SYU Hydraulic Shock Suppressor rtnalysii For 
flemoval. " 

* Consolidated Edison Co. oF New York. O3-O01O1. 7B/O4/30. 
300 p p . 

7902200014 BCCKET 50-247 Indian Point Station. Unit 3 

Submit! data, specified In Section 401 Certification for Jan 

1979. Concerns gross electrical output. rivor discharge. 

chemical discharge fc ipecles of fish. 

MONTI, M. A. Consolidated Edison Co. of Nem Yc-rlt. 79/02/09 15pp. 



790213014H DOCKET 5O-243 Mlllitone Nuclear Poiusr Station, Unit 1 
LER 79-003/031-0 on 7901OB:one op four pressure miteh* 
responsible for Initiation oF Group 1 isolation tripped 
outside Tech Spec 1 1ml ts. Caused by instrument drift. 
VaUNQ.R.h*. Northeast Utilities. 79/O2/O7. 3pp. 

7V03220119 DOCKET 80-247 Indian Point Station, Unit S 
Informi that TRADOC Pamphlet 330-30, "Inter-service 
Procedures for Instructional Bs Development" referenced in 
-021'9 IB available In microfiche. Form from NRC. 
i W. J. Division of Document Control. 79/01/09, 2pp. 



7908260233 DOCKET 50-247 Indian Point Station, Unit 2 
Forward* summary of PUR purging ! venting experiences. 
SEYFRIT, K. V. Region 4, DatU*, Office of the Director. 71/0' 

pp. 

790aCB03B5 DOCKET 50-247 Indian Point Elation, Unit 2 
. A follouiup to NRC 761113 request for submlttal of GFfsite 
Do-ii' Calculation Manual for approval, fnruiards juldellnet for 
general contents of manual. 

QRIMES, B. K. Assistant Director tnr Engineers b Projects, 

79/01/JS. 3pp. 

7902B1OOAB DOCKET 50-347 Indian Point Btation, Unit 2 
Forward * Amend 46 to License DPR-3&. SER & notice of 
Issuince. 
3CHWENCER.A. Operating Reactors Branch i. 79/01/31. 3pp. 

770BZ10O69 DOCKET B0-a4;7 Indian Point Station, Unit 3 

AMind 44 to License DPR -at ados llcanie conditioni relating 
to completion of Facility mods d implementation of 
rifflinl i-trativi fire protection controls, Modifies Tech Specs 
to Include addl limiting condition* Far fire surveillance. 
BCHWENCER'A. Operating Reactors Branch 1. 79/OL/3I. 3pp. 



790B210347 DOCKET 50-247 Indian Point Station. Unit 2 

Ack receipt oF 781119 Itr transmitting Revision 1 of draft 
rai!idlglcal effluent Tech Specs t ( HUREO-0133 for us.e in 
prBparlng llcanio- amend appll cation, Hequ-ests pitenslan of 
time for subrcitta.1 of amend. 
CAMILLj M. Cansol idatc-d Edismi Co. of Nem York. 79/02/13. 



79020102S2 DOCKET 30-247 Indian Point Station, Unit S 

Forwards IE Circular 79-02, "Failure of 120 Volt Vital AC 
Power Sup pi 1 BE. " 

ORIER.JJ.H. Region I, Philadelphia, OFFlcc of tfce Director. 

79/01/16. 8pp. 

790S130032 DOCKET 50-247 Indlon Point Station. Unit 2 

Forwards IE Info Notice 79-01, "Bergen-Pa tersDn Hydraulic 
Shock & Sway Arrastori <HS3A>, " 

ORIER.n.H, Region I, Ph 1 lado-lpti ia. OfFi.ce oF the Director. 

79/02/03. 2pp. 

79D22B047B DOCKET 30-247 Indian Potnt Station, Unit 2 

Foruards IE Culletin 79-01, "Environ Qua 1 i* iea tion of Class 
IE Equipment." W/list of 11 at, stomatie evaluation program 
plants for which no action la required. 

QRIER,D.H. Region I, Philadelphia, Office oF the Director. 

79/02/08. 2pp, 

7905310239 DOCKET SO-S47 Indian Point Station, Unit 2 
Forwards monthly operating rept For Jan 1979. 
CAHILL, W. J. ConaiHiilatEd Edison Co. of NEUI Vork. 79/02/15. lp. 

7902210241 DOCKET 30-247 Indian Point Station. Unit S 
Monthly operating rept for Jan 1979. 

Consolidated Edtsnn Co. of Hey York 79/02/03. inp 



7902230L22 DOCKET 50-247 Indian Point Station, Unit 3 

Forwards tabulation of dallg record oF fist, collections for 

Jan 1979. 

CftHILL, W. J. Consolidated Edison Co. of Hum Vork. 79/02/15. 4pp. 



IB 

79021101SB DOCKET 50-317 Indian Point Station, Unit 2 
Forwards LER 79-002/047-0. 
CAHILL, M J- Commonwealth Edison Co 79/03/06. Ip. 



7903140 192 DOCKET 50-247 Indian Point Station. Unit 2 
LER 79-002/O4T-0 on 79010B ropor ted activity of 
precipitation sample exceeded 10 times control station 
level. Caused by tritium releases from source other than 
plant. 
MASCIULLI.S. Commonweal tk Edison Co. 79/02/06. 3pp. 

7902130102 CQCKET 30-247 Indian Point Station, Unit S 
Forwards LER 79-001/O4L-0. 
CAHI-LL.W. J. Consolidated Edison Co. of New York. 79/00/07. 



DOCKETED ITEMS 



79030(,0iaa DOCKET 30-249 Dresden Nuclear Power Station, Unit 3 
NRC brief in opposition to admission of certain proposed 
contentions of Btato of IL ra spent fuel storage. Oppose* 
admission of proposed Contentions 10 (suoparts B. 9. & 10), 
1I,12D,13A t( 17. U/Certif icate nf Svc. 

GDDDARD.R.J. Office of the Eiecutiva Legal Director. 79/O1/12 
7pp. 

7902210196 DOCKET 30-349 Drasden Nuclear Power Station. Unit 3 
Forwards 8AND-1927. "Transport of Rad ionuc 1 Ides in Urban 
Environs: Working Draft Assessment." Alan forwards 
8ECY-7S-311 t 311A, indicating NRC view of rept impact on 
current regulatorg policy, W/o end. 

GODDARD.R.J. Atomic SafBtg and Licensing Board Panel. 79/01/10 
2pp. 



7902130104 DOCKET 50-E47 Indian Point Station, Unit a 

LER 79-001/Q1L-0 on 79010B. durl ng operation, 8 It) of Cr in 

form of Chrnmate released to river. Caused by leafc on 

corroded low pressure cylinder cover plate of station air 

compressor (Worth! ngtori Corp Type 4C-2I. 

MAKEPEACE. J. M. Conaol i da tod Edison Co. of New York 79/O2/O7 

IP- 



7903320095 DOCKET 50-24.7 Indian Point Station, Unit 2 
Forwards LER 7B-03S/04X-1. 
CAHILE-jW. J. Consolidated Edison Cn. of Neu York. 79/03/14. 1 

790223C09Q DOCKET 50-247 Indian Point Station, Unit 3 

LER 7B-O3B/04X-1 on 7BI212: prec ip itation sample eiceeded 10 
times control station level. Caused by tritium raleasos from 
source outside facility. NY State Dspt of Environ 
Conservation investigating area manufacturer. 
MA5CJULL1, 5. Consol idated Ellison Co. of Neu York. 79/02/14. 



3pp. 



7902370370 DOCKET 50-247 Indian Point Station, Unit 2 
Forwards LER 79-003/O3L-0 J. LER 79-004/03L-0. 
CAHILL, (J. J Consolidated Edison Co. of Now York. 79/02/16. Ip. 

7902270374 DOCKET 50-247 Indian Point Station, Unit S 

LER 79-003/03L-0 on 790130: during normal operation, signal 
from one of tuo low level alarm devices for refueling water 
tank became erratic, mak ing alarm Inoperab lo. Caused bij 
free-ling of sensing line for level instrument controller. 
MAKEPEACE, J. M. Consul idated Edison Co. of New York 79/02/16 
IP- 



7903210091 DOCKET 50-349 Dresden Nuclear Pouier Station, Unit 3 
Stipulation of contentions by NRC, State of IL b util to 
limit iEsues among parti an. Reserve rights re non-stipulated 
contentions. Related correspondence, revised contentions & 
Certificate nf Svc end, 

QQDDARD.R.J, Office of the Eiecutive Legal Director. SEKULER, 8 N 
Illinois, State of, ROWE.J.W. Commonweal th Edison Co. 79/01/24 
9pp, 

7902220177 DOCKET 50-349 Dresden Nuclear Pouer Station. Unit 3 
Memorandum re State of IL contanti one. Hi thdrauis Contentions 
10-12,14,15 t. 17 t. submits revised Contentions 3, 10, & 11. 
Related correspondence, st ipulation of contention!, state lau 
ti Certificate of Svc end. 
BCOTT.W.J., BEKULER.S.N. Illinois. State of. 79/01/26, 23pp. 

79033301SS DOCKET 30-21? Dresden Nuclear Power Station, Unit 3 
Notice of appearance of OH Cunningham on behalf of NRC. 
Certificate at Svc end. 
CUNNINGHAM, 0. H. Hear ing s Divi sion. 79/02/03. 2pp. 

7903230186 DOCKET 50-21? Dresden Nuclear Pouer Station, Unit 3 
Forwards 1978 Annual Rept for util. 
BRESEMANN, I?. W. Commonuiea 1 th Edison Co, 79/02/13. Ip, 

7903330191 DOCKET 30-349 Dresden Nuclear Poiuer Station, Unit 3 
197H Annual Rept, Rev lews 197B, five year summary of 
operations t, mgt, 5 finanical statement. 
* Commonwealth Edison Co. 7,0/13/31. 24pp. 



79033703B2 DOCKET 50-347 Indian Point Station, Unit 2 

LER 79-004/03L-0 on 790136: during normal operation, process 
radiation mo-iii tors R-ll d R-13 became inoperable due to 
selied sample pump. Caused bij soliure of Conde dry air pump. 
Model iSFCH, For process radiation monitors R-ll t, R-13. 
MAKEPEACE, J. M. Consolidated Edison Co. of Ncu York 79/02/16 



7902220119 DOCKET 30-319 Dresden Nuclear Power Station, Unit 3 
Informs that TRrtDDC Pamphlet 350-30, "Interservice Procedures 
For Instructional Sys Development" referenced in NUfiEG-0219 
is available in micro-fiche form Prom NRC, 
&E5AW,U.J. Division of Document Control. 79/01/09. 2pp, 

7903060331 DOCKET 50-249 Dresden Nuclear Power Station, Unit 3 
Informs NHC of contract u/Marah !- McLennan to perform fire 
protection svcs noted in "Fire Protection Organiiation of 
Nuclear Plant Fire Protection Functional ResponBibi 1 iti es. " 
forwarded in NilC 780BJ2 Itr. 
NAUGHTON. U. F Commonwealth Edison Co. 79/01/31. 3pp. 

7902300013 DOCKET 50-249 Dresden Nuclear Power Station, Unit 3 
Forwards interim seturitg plan for Facilities describing 
compensatory measures tn bo implemented on 790223 Ene 1 
Lulthhald (ref 10CFH3. 790). 
REED.C. Commonwealth Edison Co, 77/03/03. Ip. 

7903280365 DOCKET 50-249 Dresden Nuclear Power Station, Unit 3 
Forwards Revision 4 to modified amended security plan for 
Dresden t, Quad Cities & Revision 3 to modified amended 
security, plan For Zion. End withheld fref 10CFR2. 790) 
LEE, D CammoniuBal th EdiBon Co. 79/02/30, Ip, 

7901230373 DOCKET 30-249 Dresden Nuclear Pnuier Station, Unit 3 
Forwards ASLB 790109 "Suppl Order Ruling on Petitions to 
Intervene In Dconec-McQuire spent fuol shipment case. 
supports NRC opposition to intervention by NRDC (, Citizens 

r , i ronment ' Encl flvfllla ''l* '" Central Files. 

.J. Office of the Eiecutive Legal Director. 79/01/13. 



? 49 DreSden NuclDar Pa "*r Station, Unit 3 
P !' I? " DC S * Cit " Ens f r i B.tt.r Env.ron 
contentions. Contention 9 meets requlrementE, Notice OF 

appearance ft Certificate oF Svc end 

OOLDDERG.S C. OfFUe of th, E<ec u tlve Legal Dir,ctor. 79/01 



790331023B DOCKET 90-319 Dresden Nuclaar Power Station, Unit 3 
Forwards Endorsement 2 to Oindevs EB-1. XD-1, EO-2, XB-H, EB-3, 
XD-3, EB-29, XD-29, ED-30, XQ-30, EB-42, XD-42, EB-13. XD-43, 
evidencing nocondary financial protection, 
OSTER.J, Commonwealth Edison Co. 79/03/14, ISpp. 

7902360333 DOCKET 30-249 Dresden Nuclear Pouer Station, Unit 3 
Forwards info on BUR venting practices. 

DANCE.K.C. Region 3, Chicago, Office of the Director. 73/03/09 

3pp. 

790314021B DOCKET 50-249 Dresden Nuclear Power Station, Unit 3 
Forwards binders & seta oP divider tabs for use W/NEDO-21B8S 
"Mark 1 Containment Program Load Definition Rept. " 
BOBON.L.J. General Electric Co. .Nuclear Energy Products Div 
79/01/OB, 8pp. 

79022B03B3 DOCKET 50-249 Drasden Nuclear Power Station, Unit 3 
As followup to NRC 7B1113 request for submittal of Offaite 
Dose Calculation Manual far approval, forwards guidelines for 
general contents of manual, 

GRIMES, H.K, , Assistant Director for Engineers (i Projects 
79/01/19. 5pp. 

7903020350 DOCKET 50-249 Dresden Nuclear Power Station, Unit 3 
Forwards corrected t. reproduced copies of 79O113 Itr uhlch 
provided addl info for spent fuel pool mod, 
JANECEK.R.F. Commonwealth Edison Co, 79/01/24. llpp. 

7902210115 DOCKET 30-219 Dresden Nuclear Pouer Station, Unit 3 
Ack receipt of 78121B Itr informing NRC of steps taken to 
correct violations noted during insp on 701010-13 b 16-19, 
HIND, J. A. Region 3, Chicago, Safeguards Branch. 79/01/36. !p. 

7903230257 DOCKET 50-349 Dresden Nuclear Pouer Station, Unit 3 
Responds to 790111 request for review of paper "Vent 
Clearing During Simulated LOCA in a Mark I HWR 
Pressure-Suppression Sgs. " Recommends paper be accepted for 
pub 1 icatlon. 
GRIMES.C. Plant Systems Dranch. 79/01/31. 2pp. 

790309033B DOCKET 30-B49 Dresden Nuclear Power Station, Unit 3 
Informs o.f revised schedule for diesel generator mod. due to 
equipment delivery prub lenm. NOLI completion date is 790731. 
JANECEH.R.F. Commomuea I th Edison Co. 79/O3/02, 2pp. 



DOCKETED ITEMS 



19 



790HOBQ199 DOCKET 30-249 Dresden Nucloar Pouer Station, Unit 3 
Submits Dai; 197B program activity revieui. compri sed of info 
from selected sections at monthly rep t., ui/sec tinn on contract 
tc b 11 line status removed. Li it s meeting* held b provides 
task-bu-tak activity nummary, 

BO DON i L. J. Oeneral Electric Co. .Nuclear Energy Products Div. 
79/02/03. 10pp. 

7908320033 DOCKET 30-249 Dresden Nuclear Poiuer Station, Unit 3 
Reep-onds to 790103 request for addl Info & forwards info re 
projected number of ipent fuel assemblies to be shipped from 
Dresden to Quad-Ci ties, possible truck routes It population 
long routs*, Info on rail routing mill be sent. 
JrtNECEK.R. F. Commonwealth Edison Co. 7-7/02/13. 4pp. 

7902260431 DOCKET SO-249 Dresden Nuclear Pouer Station, Unit 3 
Requests change in Licenses DPR-2, DPfi-19 & DPR-25. Forwards 
proposed changes, Oft site Dose Calculation Manuel required by 
NRC 781119 Itr & discussion of principal differences from 
NRC guidelines far manual development. 
REED, C. Commonwealth Edison Co. 79/02/16 40pp. 

7902860443 DOCKET BO-249 Dresden Nuclear Poiuor Station, Unit 3 
Offslte Dose Calculation Manual for BranJen Station, 

* Commonwealth Edison Co. 79/02/30, liopp. 

7902BA0010 DOCKET 90-249 Dresden Nuclear Power Station, Unit 3 
Forwards. IE Imp Repts 60-010/78-33,30-237/76-30 8, 
50-E49/7B-30 on 7S1031-1103 d 1129. 

DAVIS, A. B, Region 3. Chicago, Fuel Facility ti Materials Safety 

Branch. 79/01/10. 3pp. 

7902260012 DOCKET 30-249 Drtsdn Nuclear Pouer Station. Unit 3 
IE Inp Rtpts 50-010/70-32,30-237/78-30 & 30-S49/7B-30 on 
7B1031-1103 !i 11E9. No Items of noncomp 1 iance noted. Major 
reat lnip:mgt controls, environ protection programs & 
internal audits. 

OE8TMAN, M. J. , JANUBKA, A. Q. , GRANT, W. B. -Region 3, Chtcago. Fuel 

Facility b Materials Safety Branch. 79/01 /OB. 9pp. 

7903360090 DOCKET 90-349 Dresden Nuclear Pouer Station. Unit 3 
ForuiardB IE Imp Rpts 30-010/70-33,80-337/78-31 fc 
BO-B-49/7B-31 on 781101-1201 Si notice of violation, 

FIORELLIiO. Region 3, Chicago, Reactor Operations Nuclear Support 

Branch. 79/01/13. 2pp. 

7908360094 DOCKET 90-349 Creadon Nuclear Power Station, Unit 3 
Notice of violation from Insp on 7B1101-7B1201. 

Region 3, Chicago, Reactor Operations; Nuclear Support Branch. 
79/01/09. lp. 

7902S60066 DOCKET SO-249 Dresden Nuclear POUIST Station. Unit 3 
IE Imp Raptl BO-0 1 0/ 7 B-33. SO -237/78-31 . 30-549/70-31 an 
7B1 101 1201. Noncampl lance noted: failure to follow temporary 
procedure change & failure to perform a surveillance. 
KNOPiR, C., BARKER, J.L., SMITH, J. Region 3. Chicago. Office of 

th Director. 79/01/09. 15pp. 

7902230131 DOCKET 90-249 Dresden Nuclear Pouer Station, Unit 3 
Ach receipt of 790117 Itr informing NRC of steps taken to 
correct violation* noted In IE Intp Rapt* 50-10/73-31, 
90-337/78-29 h 30-249/7B-29. 

DAUISrA.B. Region 3, Chicago, Fuel Facility t Material B Safety 

Branch, 79/01/31, lp, 

7903330134 DOCKET 90-249 Dresden Nuclear Power Station, Unit 3 
Responds to NRC 790103 Itr re violation noted in IE Imp 
Rapt* BO-10/7S-31, BO~237/7B~39 b 30-349/78-39 on 7B1113-17, 
81-33. Corrective action*: new procedures reviewed & 
riampnailied, 
REED, C. Commonumolth Edison Co. 79/01/17. 3pp. 

790HtaOOB4 DOCKET 50-249 Dresden Nuclear Pouer Station, Unit 3 
Forward* IE Info Notice 79-pJ,- "Dergin-Patarson Hydraulic 
Bhock ti Suiau Arreiton (HSSiV 
KEPPLEHiJ. Regions, Chicago, Office of the,' Director. 79/OS/02. 



7902210220 DOCKET 90-247 Dresden Nuclear Pouer Station, Unit 3 
Forwards IE Bulletin 79-01, "Environ Quallf leatlon of Class 
IE Equipment." U/lltt of 11 tgtematic (valuation iprogram 
plphts for uihlch no action ie required. 
KEPPLER, J. 0. Region 3, Chicago, Offic* of the Director. 79/02/09. 



7902370392 DOCKET 90-249 Dresden Nuclear Power Station. Unit 3 
'Forward r'-.IE Info Notice 79-^03, "Llmliorqua Vlv Oearad 
Limit Switch Lubricant.' 1 

KEPPLER, J. 0. Region 3, Chicago, Office of the Director. 79/02/09. 

IP- 

790221O29B DOCKET 30-249 Dresden Nuclear Pouier Station. Unit 3 
Forward! LER 79-001/03L-0, 
8TEPHEN8ON-B.B. Commonujefll th Edlion Co. 79/OS/09. lp. 



79022102&2 DOCKET SO-249 Dro-Gden Nuclear Power Station, Unit 3 
LER 79-OO1/03L-0 on 790 1 20: during monthly surve i 1 lance, moan 
sea level high flom isolation switch DP1B3-S61/3O tripped 
above Tech Spec mai.Caue attributed to instrument drift 
LINDBERO.C Commonwealth Edison Co. 79/OS/05 lp. 

7903140474 DOCKET 50-249 Dresden Nuclear Pouer Station, Unit 3 
Transcript of 79D2O1 prehoaring conference held in 
Chicagu, IL.rn petitions to intervene. Pp 1-9O, 

HILKOLLIN.O. Atomic Bofetij and Licensing Board Panel. STODER, Q.J. 
Uashlngton. Univ. of. JOHNSON, E, B. Oak Ridge National Laboratory 
79702/Ot. 10pp. 

7902220119 DOCKET 30-25O Turfcaij Point PSant. Unit 3 

Informs that TRADDC PampJilot 350-30, "Intaraeruice Procedures 
for Instructional Sy s DDVfflopmBnt" roferencsd in NUREG-O219 
Is avalkable in inicrof ic.hfr form from NRC. 
DEEAU, W. J. DivfBion of Document Control 79/0 1 /O9. 2pp. 

7902240279 DOCKET 50-250 Turkey Point Plant. Unit 3 

Forwards copies of change* to Revision tu 7B1O24 security 

plan. Ends withheld (ref 10CFH2. 790>. 

UHRIO.R. E. Florida POUIBT i. Light Cn. 79/03/20. la. 

7902230223 DOCKET 30-950 Turkey Point Plant. Unit 3 

Eiprossan concern re plant's effect on water at Di&cayne 

Bay. 

DERO. C. L. Affiliation Unknown, 79/01/19. 2pp. 

79020&0232 DOCKET 90-250 Turteu Paint Plant, Unit 3 

Forwards EnSoraement 2 to Policies XB-23, XQ-24 & KB -59. 
FIELDER, J. Manh t> McLennan. Inc. 79/O2/02. 5pp. 



790S120iea DOCKET 90-2BO Turkey Point Plant, Un 
Forward & Endorsement 46 to Policy NF-tBS, 
FIELDER, J. Harsh EC McLennan. Inc. 79/02/O6. 



2pp. 



790E23017i. DOCKET 5O-2BO Turkey Point Plant, Unit 3 
Forwards Endorsement 39 to MAELU Policy MF-S5) ando 
amends Condition 4 to reflect new pool capacity. 
DUCK-J.fi. Marsh b KcLann^n, Inc. 79/03 /It. 2pp. 



7903260333 DOCKET SO-25O Turkeg Point Plant, Unit 3 

FoTUjard* summary of PWH purging b venting- eiperienc os. 
SEYFRIT, K. V. Region 4. Dallas, Office of thn Director. 71 

4pp. 

79022B03S3 DOCKET SO-259 Turkey Point Plant, Unit G 

Ai follauup to NRC 761115 request For submlttal of OffsitB 
Dose Calculation Manual for approval, forwards guidelines for 
general contents of manual. 

DRIMESiQ. K. Assistant Director for Engineers b Projects. 

79/01/18. Spp. 

79020302-14 DOCKET SO-250 Turkey J>oint Plant, Unit 3 

Supports- proposed extension of Price-Anderson provisions re 
in-demnlf Icfltion of spent -nuclear f uel, rooardless of where 
fuel ii stored. 
UHRIO.R. E. Florida Po-wer !* Light Co. 79/01/29. lp. 



7902040102 DOCKET 50-250 Turkey Point Plant, Unit 3 

Buamiti required documnnts fT amend of fiipp A at Licenses 
DPR-31 It DPn-4t.re delation op Tech Spec 1. 16. 1, uh ich 
concerns fuel residence) time limit. Also forwards safety 
valuation re proposed ch^nge-s, 
UMRIQ.R. E. Florida Poiuer (.Light Co, 79/01/31. 4pp, 

7902060380 DOCKET 50-2SO Turkey Point Plant. Unit 3 

Advise* of inability tn meet schedule in NRC 7S1I15 Itr re 

1OCFR50 raqulreinents b seti 770415 as alternative rasponse 

date. 

UHRIO.R. E. Florida Pouier !, Light Co, 79/OS/01. lp, 

790H090337 DOCKET SQ-3&O Turkey Point Plant, Unit 3 

Buppl to 79010D Itr. Intends to justify unlimited purglna of 
containment during oporat 1 on. Evaluation to be completed 
790B01. Number & duration of purges will be minimi iefl. No 
interim Unit on purging established. 
UHRIQ.R.E. Florida Pauer & Light Co. 79/02/O1, lp. 

79032000*3 DOCKET 30-230 Turkey Point Plant, Unit 3 

Faruiards Class I ft Class III license amend fee in response 

to 790131 request. 

UHRIO.fi. E. Florida Pauier k Light Co, 79/02/06. 2pp. 

79022000S9 DOCKET 50-25O Turkey Point Plant, Unit 3 

Rtponda to 79O123 Itr J. Poriuarns *2, SOO payment for 7B0905 

S< OS amend requests. 

UHRIO.fl.E. Florida PDUIBT b Light Co. 79/03/07. 2pp. 



20 



DOCKETED ITEMS 



7902140306 DOCKET 50-230 Turkey Point Plant, Unit 3 

Act receipt o-t 7901IQ Hr informing NRC of stpi token to 

correct violation noted In IE Inap Floats 30-250/78-30 6 

SO-2S1/7B-30 

LEWIS. R.C. Region 2, Atlanta, Reactor Operations Nuc I far Support 

Branch. 79/O1/B3 ip. 

79021-10313 DOCKET 5Q-250 Turlieg Point Plant, Unit 3 

Responds to HHC 1 tr re violation noted in IE Insp fiepti 
50-230/7B~3u t. 80-251/79-30. Correc tive actioni : i s suanc* of 
special instruction re boric acid t^s 1 Ineups. revi sing 
Operating Procedure 2601.1, 
UHRlOjII. E. Florida Pouer I. Light Co. 79/01/10. 2pp. 

790223O253 EOCKEf HO-250 Turkey Point Plant, Unit 3 

Acfc receipt of IE Insp flept 50-350/78-33 t, 50-351/70-32. 

Mo proprietary info 

UIIBIO. H. E. Florida Punier 1. Light Co. 79/02/01. Ip. 

7902390ICi DOCKET 30-250 Turkey Point Plant, Unit 3 

Forwards IE Info Notice 79-01. "Bergon-Patersor, Jljdraulic 
Shock fc Buai] Arresters IHS3A1. " 

D'HEILLV, J. P. Region 2, Atlanta, Offico of the Director. 

79/03/03. Spp. 

7902130323 DOCKET SO-250 Turkey Point Plant, Unit 3 

Forwards IE Bulletin 79-01. "Env I ron Gual if i cation of Clasu 
1C Equipment. " 

O'REILLV, J, P. Region B, Atlanta, Office of the Director. 

79/02/03. Spp. 

7902210156 DOCKET 50-250 Turkey Point Plant, Unit 3 

Forwards IF Dulletin 79-01, "Environ Ouali f I cation at Class 
IE Equipment " H/llst of II systematic evaluation program 
plants for which no action is required. 

O'REILLY, J. P. Region 2. Atlanta, Office of the Director. 

79/02/OO, 3pp. 

790233QOI3 DOCKET 50-25O Turkey Point Plant, Unit 3 

Acl receipt of 7901JB 1 tr informing NFiC of steps taken to 

correct violations noted in IE Imp rtepts 50-250/73-29 & 

30-2S1/7B-39, 

SUTHERLAND, J, T, Region 2, Atlanta. Fuel Facility t, Materials 

Safety Branch, 79/02/09. Ip. 

7^02230017 DOCKET 30-2SO Turkey Point Plant, Unit 3 

R*<pon(Ji to NRC 7B1223 Itr re violation* noted in IE Inep. 
fipU 50-35Q/7B-29 t< 50-251/78-39. Corrective aetionir 
removal of lead Front Unit A containment during shutdown 
pr i od, 
UHHIO. R. E. Florida Pouer A Light Co. 79/01/16. 2pp. 

7902230020 DOCKET 50-230 Turkey Point Plant, Unit G 

Forwards IE Insp Jlepts 50-SSO/7H-29 (. 5-0-251 /7B-29 on 
7B1127-1BOI b notice of violation. 

SUTHERLAND, J. T. Region 2, Atlanta. Fuel Facility t. Materials 

Safety Branch 73/12/23. a pp. 

7503330021 DCCKET 30-350 Turkey Point PUrtt, Unit 3 
Notice of violation from inap on 781127-1201. 
* Region 3, Atlanta, QPfice of the Director, 78/12/22. Ip. 



7902220H9 DOCKET 50-231 Turkey Point Plant. Unit 4 

Infarmi that TPADOC Pamphlet 330-30, "Inkortarvi ce Proce^urei 
for Instructional Bys Deve 1 c-pmrnt" raferancBd in NUREQ-T)219 
i available In mltrofiche form from NfiC. 
GEfiAH.H. J. Diviiion of Document Control, 79/O1/09. 2pp. 

790'33fi027B DDCET 50-251 Turiey Point Pl^nt, Unit 4 

Foriuartf* copies of changeo to Ravl-sion O to 7B10B4 Bcorlty 
plan. Ends withheld (ref lOCF'RS. 790 I . 

.E. Florida Pouer *. Light Co. 79/OB/20. Ip. 



7902220233 DOCKET 50-231 Turkey Point Plant, Unit 4 

Eicpreiies concern r0 plant's effect on water at Biicaijne 

Day, 

BERQ.-C.L. Affiliation Unknown. 79/01/17. 2pp, 

790-2060353 DOCKET 50-251 Turkey Point Plant. Unit 4 

ForujariJi Endorsement 2 to Policies XQ-23,XJ]-26 b XB-S9. 
FIELDER, J. Marsh & McLennan, Inc. 79/O2/O3. 9pp. 



79031SQ1BB DOCKET 50-231 Turkey Point Plant. Un 
ForuBTdi Endorsement 4i to Policy NF-103. 
FIELDER, J. Marsh t. Mct-ennan, Inc. 79/OS/Od. 



2pp. 



7902230174. DOCKET 30-251 Turfcey Point Plant. Unit 4 

ForuiaTda Endorsement 39 to MAELU Policy MF-33i Bndorsement 
amanifi Cotidition 4 to re-fleet neui pool capacity. 
BUCK. J, 3. Marsh & McLcnnam Inc. 79/D2/1&. 2pp. 

7903380393 DOCKET 50-251 TurliB-y Point Plant. Unit 4 

As Pollouiup to NJ1C 7B111B re-quest for Bubraittal at Dffilt* 
Dose Calculation Manual for approval, foruinrds guldallnei for 
general ccntents of manual. 

GRIMES, B. K. Assistant Director fo-r Engineers fc Projects, 

5jlp. 



79020B0244 DDCrtET 90-251 Turkey Point Plant. Unit 4 

Su-pports proposed oitensfon of Pr it e-And er son provisions r-o 
Indemnification of spent nuclear fus 1 ragor J-leis of uihr* 
fuel li stored. 
UHHIQ. R.E. Florida Pouer & Light Co. 79/O1/Z9. Ip. 

79020i,01B3 DOCKET SO-251 Turkey F.oint Plant, Unit 4 

Bubmits required documents for amend of App A of License* 
DPR-31 b DPR-41,ro delBtion of Tach 8p*c 1. 16. 1 , mh 1 eh 
concern* fuel residence time limit. Also Forwards safety 
evaluation re proposed changes. 
UHHIQ.K.E. Florida Power 8. Light Co. 79/01/31. 4pp. 

79020&02S3 DOCKET 90-291 Turkey Point Plant, Unit 4 

Advisee of inabilltg to meet sthaduU in NRC 761115 Itr re 

10CFRSO requirements & sets 790419 a* alternative response 

date. 

UHFIIQ.R.E. Florida Pouer & Light Co. 79/03/01. Ip. 

7902090357 DOCKET 50-2S1 Turkeu Point Plant, Unit 4 

Suppl to 7901 OS Itr. Intend* tn justify unlimited purging of 
containment during oparat ion. Evaluation to be temple-ted 
790G01. Number fr duration of purges mill ba minimiied. No 
intirltn limit on purging established. 
UHHIO.R.E. Florida Power & Light Co. 79/02/O1. Ip. 



7902330034 DOCKET BO-230 Turkey Point Plant, Unit 3 

IE Insp Rapts 3Q-290/7B-29 & 50-251/7B-37 on 7B1127-1201. 
NoiKdirpliancD noted: uncurl tten safety evaluation, 

ZfiVADOSrtK R, H. . OID6DN.A.F, fieflionS, rttlanta. Fuel Facility (t 

Materials Sflfaty Branch. 7G/I2/22. 4pp 

7902260105 DOCKET 50-350 Turkeg Point Plant, Unit 3 

ForuardB IE Info Hntlc-i 79-03, IH Lim.i torque Valve Geared 
Limit 3uiUh Lubricant." 

O'REILLY. J. P. Region 3. Atlanta, Office of the Director. 

79/02/09. H PP. 



7902030103 DOCKET 50-230 Turkey Point Plant, Unit 3 
Forwards LER 7B-O17/03L-0, 
BCHHIDT,A,D. Florida Pouar (< Light Co, 79/01/17. 



7702CS-01Q5 DOCKET 50-350 Turkey Point Plantr Un.lt 3 

E-ER 78-01 77 03L-0 nn 7B1 21B: found source of intermi ttent 
radioactive gas leak (Email thru-uall defect near top of 
chemical & vol -control <tys ftnldup tanl A). Defect probably 
dug to fatigue ttrass. 
eCHOPPMAN.rl. A. Florida Power b Light Co. 79/01/17. 2pp. 



790312013& DOCKET 50-230 Turkey Point Plant, Unit 3 
Forward* LER 7H-01B/03L-0. 
SCHMIDT, fi. D. Florida Pomer ft Light Co. 79/01/30, 



7902130139 DOCKET SQ-2BO Turkey Point Planti Unit 3 

LER 7E3-01B/O3L-0 an 781331: "A" auxiliary Pne.duater pump had 
eeiied shaft. Posidlg due to overheating, caused by steam 
leakage on fveduater pait syi valves. 
6CHOPPHAH,rt A. Florida Pouier t. Liaht Co. 79/01/30. BPP. 



7902200063 DOCKET .SO-E51 Turkeg Point Plant. Unit 4 

For ward i Class I ft Class III lice-its* amend fee in response 

to 790131 request:. 

UHRI8. H. E. Florida Pniuer Si Light Cn. 79/02/OA. 2pp. 

7902200029 BQCHET 30-2*1 Turkey Point Plant, Unit 4 

Responds to 790133 Itr & forwards 93, BOO payment for 7B0903 

b 08 amnd reque'ita. 

UHBIOiR. E. Florida Power t. Lioht Co. 79/02/07. 2pp. 

7903360130 DOCKET |s 0-2 51 Turkey Point Plant, Unit 
Forwards request to amend DPR-4J. Proposed amend would 
postpone steam generator in*p for to days, 
UHRIO.R.E. Florida PoueT & Lloht Co, 79/02/1A. 3pp. 

790S3S0369 DOCKET 50-251 Turkey Polnl Plan-t, Unit a 

Foruardi *4000 checli re license amend request dtd 790214. 
UHftIO, R. E. Florida Pouier ti Llflht Co, 79/02/20, 3pp. 

79021H0306 DDCKKT 50-S91 Turkey Point Plant. Unit 4 

Ack recalpt c-F 790110 Itr inPorning NRC at ttsps taken to 

correct violation noted In IE Imp Rapta SO-aSG/7B-3O {, 

BO-231/7H-30. 

LEHIS.H.C. Region S, Atlanta. Reactor Operations Nuclear Support 

Branch. T9/O1/23. Ip. 

7903110315 DOCKET 30-231 Turkey Point Plantj Unit 4 

Respond to KRC Itr r* violation noted In IE Insp Repti 
80-H30/7B-3O t< 30-2S1/7B-3O. Cnrrec tive t tions: i uanc* of 
special Instruction r* boric acid u lineupsi revislnp 
Operatins Procedure 24O1, 1. 
UHftlO.R.E. Florida Pouiar (. Lioht Co. 7?/Ol/lO. Epp. 



DOCKETED ITEMS 



21 



7-902220'259 DOCKET 30-231 Turkey Point Plant, Unit 4 

Ack receipt of IE InBp Rept 50-230/7B-32 b 50-291/76-32. 

Ha proprietary info. 

UHF1HJ. R. E. Florida Power (< Light CD. 79/02/01. Ip. 



790B2SD1Q& DOCKET 80-251 Turkey Point Plant. Unit 1 

Forward* IE Info Notice 79-O1, "Bergen-Paterson Hydraulic 
Shack b Suiay Arrestor (HS3A)," 

O'REILLY, J. P. Region 2, Atlanta. Office of the Director. 

79/02YQ2. Spp. 

7902120383 DOCKET 50-291 Turkey Point Plant. Unit 4 

Forward* IE Bulletin 79-O1, "Environ Qualification of Class 
IE Equipment. " 

O'REILtV. J. P. Region 3, Atlanta, Office of the Director. 

79/02/05. 2pp. 

7902210196 DOCKET 50-251 Turkey Point Plant, Unit 4 

Forward! IE Bulletin 79-0 lr "Environ Qualification of Class 
IE Equipment." W/list of tl iy*tmatlc evaluation program 
flanti for which no action 1* required. 

O'REli,LY. J. P. Region 2, Atlanta, Office of the Director. 

79V02/OB. 2pp. 

7902230013 DOCKET 50-251 Turkey Point Plant. Unit 4 

Ack receipt of 79O11B Itr informing NRC of stipi taken to 

corrtct violations noted in IE Insp Repts 30-230/78-29 & 

30-23I/7B-29. 

SUTHERLAND, J. T, Region 2, Atlanta. Fuel Facility & Materials 

BaPety Branch. 79/02/09. Ip. 

7702230017 DOCKET 50-251 Turkey Point Plantj Unit 4 

Raipondi to NRC 7B1222 Itr re violations noted In IE Insp 

Repts 50-250/7B-S.9 < 50-H91/7B-89. Correct ive action*: 

removal of lead from Unit 4 containment during shutdown 

period. 

UHRI8.R.E. Florida Power (< Li D ht Co. 79/01/18, Spp. 



7901220372 DPCKET 50-354 Quad-Citiea Station. Unit 1 

Forwards ASLH 790109 "Suppl Order Ruling on Petitions tn 
Intervene" in Qcotiea-MeQuir e spent fuel shipment case. 
Supports NHC opposition to i n tor vent ion by NRDC & Citiiens 
for Better Environment. End available in Central Files. 
GODOARD.R.J. Officn of the Executive Legal Director. 79/01/12. 1 

7903060104 DOCKET 50-354 Quad-Cities Station, Unit 1 
NRC response to NfiDC'a St Citiieno for a Better Environ 
7B122Q contentions. Conte-ntion 9 meets requ ireniBnts. Notice of 
appearance k Certificate of Svc end. 

GOLDBERG, 6. C. Office OF the Eiecutive Legal Director. 79/01/12. 
19pp. 

79O2OAO12B DOCKET 30-254 Quad-Cities Station, Unit 1 

NRC brief In opposition to admission of certain proposed 

contentions at State; of IL re spent fuel storage Opposes 

admission of proposed Contentions 10 (subpart-a B. 9, !< 10), 

11,12B,13A 4. 17. W/Certiflcate of Svc. 

GODDARD.R. J. Office of the Eiecutive Legal Director. 79/OI / 1 2. 

7pp. 

7902210l9i DOCKET 50-354 Quad-Cities Station, Unit 1 

Forwards 8AND-19B7. "Tr-anaport of Ran ionuc 1 ide a in Urban 

EnvlTons:Uorliing Bra.Pt Assessment. " Also Foruiflrds 

SECY-7B-311 t 31 IA. indlcatinj NRC vieui of rept impact on 

current regulatory policy,. W/n end. 

CODDARD.B.J. Atomic Safety and Licensing Hoard Panel. 79/01/1B. 

Spp. 

7902210091 DOCKET SO-.254 Quad-Cities Station, Unit 1 

Stipulation of contentions bu NRC, State of IL t. util to 

limit issues among par ti es. Reserve- righto re non-stipulated 

contentions. Related correspondence-, revised contentions t< 

Certificate- of Svc oncl. 

OODDARD.R.J. Office of the Eiecutive Legal Director. SEKULER 1 . 3. N. 

Illinois' State of. ROUE, J. M. Commonweal th Edison Co. 79/01/H6. 

9pp. 



77D2230020 DOCKET 90-291 Turkey Point Plant, Unit 4 
Forward* IE Imp Rept* 90-290/79-29 t. 50-251/78-29 on 
781127-1201 ii notice of violation. 

aUTHRUAND, J. T. Region 2. Atlanta. Fuel Facility & Mat 

Safaty Branch. 73/12/22. 2pp, 

790223-0021 DOCKET 50-251 Turkey Point Plant, Unit 4 
Notice of .violation from insp on 781127-1301. 
Region 2, Atlanta, Office of the Director. 7B/12/H2. 



Ip. 



79Q223OOS4 DOCKET 50-251 Turkey Point Plant, Unit 4 

IE Inp Rept* SO-290/7B-39 * 30-SS1/7B-29 on 7B1 137-1201. 
NoncompllAnce nottd: unwritten .safety evaluation. 

ZAVADOSKI.fi. W. . OIBBDN, A. F. Region 2, Atlanta, Fuel Facllltu t. 

Material i Bflftty Branch. 78/12/22. 6pp. 



7902230177 DOCKET 90-354 Quad-Cities Station, Unit I 

Memorandum r Btate of IL content i ons, Withdraws Contentions 
10-12, 14.15 & 17 !< submits revised Contentions 3. 1O, i 11. 
Related correspondence, s tlpulation of content i ons, state 1 alu 
& Certificate oP Svc encl. 
SCOTT, W. J. , SEKULER.S. N. Illinois, State of. 79/01/26. 25pp. 

79022B01B2 DOCKET 50-234 Quad-Cities Station, Unit 1 

Notice of appearance of QH Cunningham on behalf of MRC- 

Certlflcate of Svc encl. 

CUNNINGHAM, O. H. Hearings Division. 79/0-S/O5. Spp. 



790SB301B6 DOCKET 5O-251 -Ouad-Cities Station, Unit 1 
Forward* 197B Annual Rept for Util. 
BREBEHANN.a. U. Commonwealth Edls-onCo. 79/02/15 



7-)OS2a0103 DOCKET 50-291 Turkau Point Plant, Unit 4 

Foruiird! IE Info Notice 79-03, "Limitorque Valve Geared 
Limit fiuitch Lubricant. " 

O'REILLY, J.P. Region 2, Atlanta, Office of the Director. 

79/02/09. 2PP. 



7902200031 DOCKET. 50-331 TurHey Point Plant, Unit 4 
Forward! LEft 7S-016/03L-0. 
SCHMIDT, A. D. Florida Power t, Light Co. 79/O1/19. 



Ip. 



7902200023 DOCKET 50-251 Turkey Point Plant, Unit 4 

LER 7S-016/03L-0 on 7B1219: proces* radiation monitors R-ll tc 
R-J2 uire out of ivc For about 18-h. Air lampling blouer 
uhlch moniton R-ll k R-12 failed dun to normal uar. 
BCHOPPMAN. M. A. Florida Pouier fc Light Co. 79/01/1B. Ip. 

7702820119 DOCKET 30-234 Quad-Cities Station, Unit 1 

Inform that TRADOC Pamphlft 390-30, "Intenervice Procedures 
For Initruetlonal By* Development" referenced in NUREO-0219 
i* available In microfiche farm from NRC. 

. J. 'Division of Document Control. 79/01/09. Spp, 



79080bQ331 DOCKET )0-234 Quad-Cities Station, Unit 1 

Informs NRC of contract in/Marsh b McLennan Co perform fire 
protection *vc* noted in "Firs 'Protection Oroaniiation of 
Nuclear Plant Fire Protection Functional Responsibilities," 
rcrwrded in NHC 7BOB12 Itr. 
MAUOHTON 1 W. F. Commonwealth Edison Co. 79/01/31. Hpp..' 



7902230194 DOCKET 3O-234 Quad-Cities Station. Unit I 
1970 Annual Rept, Revi Riua 1975, Five year summary of 
operations & mgt. & Finanical statement. 
* Commonmealth E'dlson Co. 78/12/31. 24pp. 



7902210233 DOCKET SO-254 Quad-Cities Station, Unit 1 

Forwards endorsement 2 to Dindera ED-1. KB-1, EB-2, XB-2, ED-3, 
XB-3,EB-29, XB-S9. EB-30, XB-30, EH-42, XB-43, EB-43, Xn-43, 
evidencing aecondar^ financial prat-action. 
OSTER.J. Commonwealth Edison Co. 77/02/14. 15pp. 

7902210240 DOCKET 50-254 Quail-Cities Station, Unit 1 

Forwards Amend 115 to Indemnity Agreement NF-43,Amerad 97 to 
MKF-22, Amend 5t to NF-1B7. Amend 47 to MF-34, Amend 49 to 
NF-2O1, Amend 39 to MF-il, 6 Amend B to NF-253 for calendar 
year 1979. 
OSTEfl.J. Commonwealth Edison Co. 79/02/14. Bpp. 

790BHAO33S DOCKET 5D-254 Quad-Cities Station, Unit 1 
Forwards info on BWR venting practices. 

DANCE.H. C. Region 3, Chicago, Office oF the Director. 75/ 

Spp. 

7902140218 DOCKET 30-234 Quad-Cities Station, Unit 1 

Forwards binders & net* o* diviftar tabs for use U/WEDD-218BB 
"Mark 1 Containment Pro-B^m Load Definition Rept." 
fiODON.L. 0. General Electric Co. .Nuclear Eneroy Products Div. 
79/O1/OB. 0pp. 



790BZ00043 DOCKET 30-854 Ouad-Cities Sttion, Unit 1 

Forwards Interim sicurlty plan for facilities describing 
compensatory miaiures to be Implemented on 790323. Enel 
withheld <rf 10CFRS. 790). 
REED.C, Commonuiealth Ediion Co. 79/02/OB. Ip. 

7908250265 DOCKET 90-254 Quad-Cltiei Station, Unit 1 

Forward* Revision 4 to modified amended security plan for 
Drtfdn t. Quad-Cities h Revision 3 to modified amended 
curity plan for lion.Encl withheld (r.f 1OCFR2.790). 
LEE,B. Commonwealth Edison Co. 79/02/20. Ip. 



79022B03B3 DOCKET 50-254 Quad-Cities Station. Unit 1 

As follouup to NRC 761113 raquest for oubmittal of OFFslte 
Dose Calculation Manual for ap proval, forwards guidoline! for 
general contents o,f manual. 

CRIMES, B. K. Aisistant Director for Engineers t< Projects. 

79/01/16. Spp. 



22 



7OU4 




3 ~ 2S4 "--ti". Static, Unit 1 
3enC1J C " an * E to F "'lit *"" S SC 



DOCKETED ITEMS 



to 



HEvAW.fi. Operating Reacts Branch 3. 7-7/&1/25. 2pp. 

T SSl???^ t f CKE I 52~ aM a -C' Station, Unit , 

'i"jj^ ^ D n^ n m ::;i^ '- *--.- /.PP..c.nt 

UEVAN.R. Operating factors Dranth 3. 79/01/39. Ip. 

5 ' <""'-Clti.. Stolen, Unit 1 

Li t>J.F!-29,i as ued orallv bg 

r A ""* !. (. n D tice of issuance. 

T. A. Operating Reactors Branch 3. 79/01/30. 



Spp. 



- - 294 "-CIti Station, Unit , 

?n/ to >''"""> DPR-a? revi6Ba 7ecn Specs to e.tentf 

J*?nI!2V r* d tQ flita61 '^ inerted atmosphere in 
conta injnent beyond 3fl-h. 

IPPDLITO, T. A. Operating Reactors Brant* 3. 79/OJ /30. 

7902150132 DOCKET 3O-354 Quad-Cl tU* Station, Unit 1 

fnh.,ll-?h? Otl F r *" rnd " t0 L1 " n " DPR-a?. Conclude 

CDfflbuatlblB gas control attainable b u D tbsr meanB. Finds 
propoied amend acceptable. 
* Office of Nuclear Reactor ne B ulatten. 79/01/30. 3pp. 

7903150134 DOCKET 5O-S54 Quad-Cities Station, Unit 1 
Vppn^Tn T l " u * ne " f * t" Llce n9e DPR-29. 
irrounu, I. n. Operating RBflctam BraneJi 3. 79/O1/30. 

79023B0237 DOCKET 5O-H94 fl ua d-Cit( et Static, Unit 1 
Responds to 790161 renuest for review D f p aper "Vent 
CUdPitig D^rlnB Simulated LDCA in a Mark I BUH 
putncati^ 1 " 1 ""' " BM '-" RBIDranlBI " rB P'P" * accepted for 
QRIWEB.C. Plant Sy. terns Branch, 79/01/31. 2pp. 

77020B0173 DOCKET &O-254 Oua^Cities Station, Unit I 

Submit. Dee 197B progr activity rivi eiJJ comprised O f info 
ft-om i.lKtjd Mctinnm of n onthl v rp t, u/, action an contract 
*! 1^ J ^tuj TJ"i.v.d.Ll.t, meetly, ft B ld E, provides 
taal-by-task activity summary. 

EI "* Me C*- "" Energy JTaducts Dlv. 



3pp. 



3pp. 



7903220033 DOCHET SO-254 Q^fl-Clties Station. Unit I 

^l^'/ "fr'M.i-'IW'-t FT addl inFo t. foruiards infc- re 
projetted nurabor of lp8n t fuel aEKam 611 9 to be sMpped From 
- : *? ^"'^"if i. tM,cfc r. u f. t, popu !". 
,!^^r UtBB ' lnfo Dl1 ral1 Totitln.j uilli be ,*nt. 
JANECEK.R.F. Commonw*ilth Edtson Co. 79/02/13. 4pp. 



790B22006S DOCKET 3O-35-) Quad-Cities Station, Unit 1 

Forwards add I ii,C o re prpoed amend to License DPR-39 to 
support Rload 4. Info Involves correction to uater level, 
raf. to rePUct longer fuel length of B.aft retrofit fuol t, 
opeTatton in caaitdnmn mode. 
REEDiC, Comnanued) th Edison Co. 79/02/14. I0pp. 

7702260375 DOCKET 30-334 Ouad-Cities Station, Unit i 

Inform, that response to NHC 781205 Itr ii delauvd du B to 

J*ISrJi V ' UB9tlDnB ' infD "" * 'oruarded bg 790419, 
JANECEK.R. p. Commomuealth Edison Co. 79/O2/14. tp. 

7902B6027Q DOCKET 30-254 Q^ad-Cities Station, Unit 1 

Euftmits re^ ost Cor ch^rje to Hceni* DPR-29 8, DPR-ao, App A 

I I S^^^n- Tf Vl S" TBClh S f B " l """ *< 
= *" el Offlita DoBB Calculation Manual 

REED.C. Commonuieal th Edison Co. 79/OH/1A. 2 pp . 

7902260273 DOCKET SO-294 Quad-Cltl OB Station, Unit 1 
Offaita- Dose Calculation Manual. 

Cojnmonwealth Ed i van Co. 79/OB/2B. J5Op.p. 

7708030028 DOCKET 50-254 Quad-Cities Station. Unit J 

''**,"!, 79011 * ltr In(lo in 9 RC of , tl , tjlte 
nDl0tl '" IE InSp """*" 

l3< Cl " ca!]0j Reaetor 



790SOB0034 DOCKET 3O-S54 fluad-CUies Station, Unit J 

Riipfnd! to NRC 7aiEH& ltr re violations noted in IE Inao 
R.pt. 30-231/76-30 t, 80-3i3/7fl- 3 0. Correc tiv. ac ti n .. P 

ntr !! "'P"" 01 fHng need for malntalnins c l tts 
control of lota pauiar- range monitor calibr. 
REED.C. Coirmonueal th EdUon Co. 79/01/li. 3 PP . 



7903120094 DOCKET 30-2S4 Quad-Cities Station, Unit 1 

Forwards IE Info Notice 79-01, "Deroen-PatorBan Hydraulic 
Shock & Suiay Arresturs (HSBA)". ' 

KEPPLER.J.G. Region 3, Chicago, OffUe of the Director. 79/02/03 

7903210320 DOCKET 50-294 Quad-Cities Station, Unit 1 

Forujards IE Bulletin 79-01, "Environ Qualification of Class 

IE Equipment. " H/li.t of 11 ^gstematic evaluation program 

plants for which no action Is required. 

KGPPLER.J. G. Region 3, Chlcajo, Office of the Director. 79/02/09. 

790H2703S2 DUCKET 30-254 Quad-Cities Station, Unit 1 

Forwards IE Info Notice 79-03, "Llmltorque Valve Geared 

Limit Switch Lubricant. " 

KEPPLER.J.Q. Region 3, Chica 90 , Office of the Director. 79/Oa/O?. 



790222011fi DOCKET 50-E54 Quad-Cities Station, Unit 1 
nontfllg operating rept for dan 1979. 
HrtUNUM.D. Commonuealth Ellison Co. 79/OH/12. 24pp. 



79020B0184 DOCKET 30-294 Quad-Cities Station, Unit 1 
Forwards LEft 7a-032/O3L-0. 
KALIVIANAKI8, N. Commonuealth Edison Co. 79/01/19. 



ip. 



, a - 23 ' 1 a-Mti.. Station, Unit 1 
78-032/03L-0 on 7BiaiG: cal Ibr (, functional test for 
uDll pressure instruments P51-1001-S9 A thru D found not 
K"**' /T.eh Bpte..C.uMd 6u instrument drift 
Coirmonuoalth Edison Co, 77/01/19. 2 pp . 



790SOB0215 DOCKET 3O-354 Quad-Clti BB Station, Unit 1 
Forwards LER 7B-033/03L-0. 
KALIVIANAKIB, N. Commonwealth Edison Co. 79/01/17. 



on 9 ~ 2S4 Oit.--Citi.. Station, Unit 1 
8-033/03L-0 on 70121-?: during automatic Uolation of 

II U 1 J?/'' i ? I * t I" 1 '* 1011 -"P.r. 1-574! A JD fa led 

Itucl 2 %-IuS J" 1 """ 1 ? nn , alr "P"-* -- "* "amper valve. 

BCHN T7 M rv , *% iupply alr llla 1 n " d ' d * =>" valve. 

BCHNITZMEYER.J. Commonuealth, Edl.on Co. 79/01/17 3pp 



79MI401W DOCKET 50-234 Q UH d-Citie. Station, Unit 1 
Forwards LER 79-001/03L-0. 
KALIVIANAKIS, N. CommonuealtJi Edison Co. 79/01/19. 



0"-Citl.s atatlon. Unit 



Ip. 



uc f rm. 

i iloljtiDn J Ql ' "actor cor. isolation coolinfl st.m 
line occurred. Caused bu failure of micro switch 

'*;*" lln> MBh floul "-"n,Ul pressure swiich 
CommonwBilth Edison CD. 79/01/1B Hpp au " Tcn ' 



790226032H DOCKET 30-834 Qu.d-Cltl.. Station, Unit 1 
Forwards LER 79-004/01T-0, 
KALWrANAKIS.N. Commonuiealth Edison Co. 79/02/01, 



Ip. 



CLAHK.D. Comxionuiealth Edison CD. 79/Oa/OI. 3pp. 

7902260443 DOCKET 30-234 Quad-Cities Station, Unit 1 
Forwards LER 79-002/03L-0. *on, unit l 

KAL1VIANAK18, N. Commoruealth Edison Co. 79/02/03. Ip. 



SCHN1TZMEYER, J. Commonu.al th Edison Co. 79/03/08. 3pp.. 

7902140474 DOCKET 30-334 Quad-Cities Bt-tior,, Unit 1 

"*'> "nf.r.nc. held in 
* to Int.rv.n.. Pp 1-90. 





79/O2/01, 90pp. 



, 

National 



'!: 1111 :* 3 W''tfvlc. Procedure. 
? . " I a ?' v ' 1 P'""t" M-irtneiJ in NUREO-0219 
in mierofleh. form from NRC. 

Division of Document Control. 79/01/09 2pp 



79022EOU9 DOCKET 50-H38 PaH.a 
"'" 



7908&60839 DOCKET BO-8S3 Paliiadai Nuclear Plant 

Inform* of title change from Security Operation. Supervisor 
to Property Protection Supervl.or effective immtdiat.lg 
Change will be reflected in reviled .ecuritg plant expected 
to bi approved by and of Feb 1979. 
HOFFMAN, D. P. Con.umBri Power Co. 79/O8/01, Ip. 

79022B0253 DOCKET 30-23B Pall.adai Nuclear Plant 
Foruardi revl.ed .ocuritg plan, which Identlfie. 
unrolve(( Item. (, bail, for util po.itiani. Al a includei 
tatui of Security II modi h compeniatoru mea.ure. Encl 
withheld (ref 10CFR2. 790). i".tnci 

HOFFMANjD. P. Coniumen Power Co. 79/02/21. Ip, 

790W60187 DOCKET 30-23B Pall.adei Nuclear Plant 

Forwardi Endorsement 89 to NELIA Policy NF-179 b Endori.ment 
33 to HAELU Policy MF-BO for calendar year 1979. 
FOSTER, a. C. Coniumer. Powor Co. 79/08/01. 3pp. 

7W3&90284 DDCKET 30-2BB Pall.adei Nuclear Plant 

Forward. Endonenent 2 to Dinder EB-BO & Endorsement 2 
to MAELU Binder XB-20. ref lecting fee due for ocondary 
financial protection binder for 1979. 
FOSTER. B.C. Coniumer* Power Co. 79/08/02. 3pp. 

7902360233 DDCKET 30-83B Pall.adei Nuclear Plant 

Forwrd tummmry of PUR purging b vntlng experience*. 
BEVFRIT.K,V. Region 4, Dalla., Office of the Director 74/ 

4pp. 

7902010277 DDCKET 30-23B Pall.adei Nuclear Plant 

Forward! Amend 44 to DPB-20, In re. pome to 781227 reeue.t, & 

notice of Itiuance. 

ZIEMANN, D. L. Operating Reactor. Branch 2. 79/01/19. 4pp. 



DOCKETED ITEMS 



23 



7902200074 DOCKET 30-333 Palisadea NiKl, Br Plant 
Faruardi shuc k for * 12, 300 to cover Claa. JV fee 
HOFFMANiD. P. Consumer a Power Co. 79/02/07 Ip 

7903140063 DOCKET 90-253 Pali .ados Nuclear Plant 
Advi.ei that util Is satisfied w/NFIC revised draft 
valuation of systematic evolution program Topic IV-l-A 
"Operation H/Les than All Loops in Svc, " 
HOFFMAN, D. P. Coniumers Power Co. 79/O2/CB. ip. 

7902830196 DOCKET 30-255 Palisadei Nuclsar Plant 

"Reactor Internal! Nolan Monitoring Teiti" for period Apr- 
Qct 1978 (first 6 full months of Core 3). 
ConiufliBTi Pour Co. 79/Q1/31, 47pp. 



7908010013 DDCKET SO-255 Palisades Nuclear Plant 

Forwards IE lnp Rept SO-333/7B-BB on 7BU27-1SOI. 
No noncomp 1 lane e noted, 

FIDRELLl.Q, Region, 3, Chicago. Reattor Operationi 

Branch. 7B/ia/SB, 2pp. 



Nue lear Support 



7902010021 DOCKET 50-233 FallsadBi Nuclear Plant 

IE Imp Rapt SO-255/7B-2B on 7B1 IB7-I3O1. No none omol iancH 

rioted. Major area* imp BE tod: design changes, outstanding fnap 
i tarn* b mods. 

OOROENSEN.B.L, , HUNTER, D, It. . HARNICK, R. F. Region 3. Chlcagor 

Office of the Director. 7B/12/2&. 4pp. 

7902090079 DOCKET 30-835 Pall.ade. Nuclear Plant 

Ack receipt of 781H27 1 tr informing NRC of tep. taken to 
correct violations noted In IE ln*p Rapt 50-233/7B-25 

KEPPLEfl.J.Q, Region 3, Cft Icago, Office of the Director. 79/02/03 

2pp. 



790SO1O2B4 DOCKET 30-238 Pall.ade. Nuclear Plant 

AM.*nd 46 to Ppoviiional Llcin.e DPR-EO change*. auction I, 

Teeh Sped to reflect reviled plant orgenliatlonal 

tructuri, provide flexibility b allow for- more efficient 

plant operation. 

ZIEMANN-D, L. Operating Reaeton Branch 2. 79/01/19, 



3pp. 



79080IO28B DOCKET 90-833 Palisades Nuclear Plant 

Notice of U.uanee of Amend 46 to Provisional License 

DPR-20. 

IIEMANNiD. L. Operating Reactori Branch 2. 79/01/19. 8pp. 

7WiBQo0043 DOCKET 80-893 Palisade. Nuclear Plant 

Famardi notice of propo.ed issuance of amend to Licen.e 
DPB-aO re it tan flenerator replacement prooram & ichedule. 
0numeri Power ihould lend ateam oenerotor. replacement 
Braorapi for revietii. 
ZlEHANNiD. L. Operattnit Reactort Branch 2. 79/O1/19. 2pp. 

790StW0047 DOCKET 30-283 Paliiadis Nuclear Plant 

Notle* of propoied ittiuance of amend to Ucene DPR-20 re 

tttai* generator replacement program d ichetfula. 

IIEMANN.D.L. Operating Reactori Branch B. 79/01/19. 6pp. 

7W2J30213 DOCKET 80-23B Pali nadei Nuc loar Plant 

Foruardi NRC rvviied draft evaluation of lytteinatic 
Vlu*tlon program Topic IV-l-A. R*qgttt util to .ismlns 
Mcti b conntint within 30 dayi. 
ZIEtHMNiD. L. Operating Reactori Branch 2. 79/Q1/SB. 4pp. 

7902860379 DOCKET 80-288 Plliade NueUnr Plant 

Ack receipt of 7BO70A eubnlttal r* PWH moderator dilution 

naluili. flf<tut*t addl info to verify evaluation of 
S"? 1 ! 1 for * tlttT D< "' " dilution accidenti not analuttd in 
FSAR fc deicrlptlon of admlniitrattve contrail. 

ZIEHAMNiD. L. Operating Raacton Branch 2. 79/03/01. 2pp. 

7Wa06023l DOCKET BO-SS3 PiH.adt. Nuelear Plant 

fliipanifi to 781214 requeit for addl Info re acceptable 
lvilt of vibration in dampen including meaiurementi on 
metlon b diicharge piplng.lc percentage of dlicharge 

rueure puUationi removed by puliatlon dampen. 
HOFFMAN, D. P. Coniumiri Power Co. 79/02/08. 4pp. 

7902040290 DOCKET 80-233 Palli.dee Nuclear Plant 

Intarmt MBC of inability to reipond to 790109 Itr r ntn* 
tuttenatlc evalution program topici uithln allotted 30 daui 
Hill i-.ipond by 790380, - * 

HOFFMAN. D. P. Coniumart Pouer Co. 79/08/02. Ip. 

790320001B DOCKET 80-283 Palliadei Nuclear Plant 

tUioondi. to NRC 7B1204 Ic 790117 Itre re fe for technical 
ehvnjet ,r under- d ovtrvoltagt protection for emergency 
fOWt m. Intiiti mod li not unreviewed *afety quattlon l< 
khtr Ucaniee* wert not required to pay limilar fees. 
HDFFHAMi D. P, Conum*n Pouer Co. 79/08/04. Ip. 



790S180032 DOCKET 50-858 Pli.ade* Nuclear Plant 

Forward. IE Info Notice 79-O1, "Bergen-palenon Hydraulic 
Shock & Suau. Arreitorsi (MBSrt)". 

KEPPLER, J.O. Region 3, Chicago, Office of the Director.' 79/03/02 

IP. 

7908210216 DOCKET 30-283 Paliiadei Nuclear Plant 

Forward. IE Bulletin 79-O1, "Environ Qualification of Cla.s 
IE Equipment." H/lUt of It systematic evaluation program 
plant, for which no action is required. 

KEPPLEH, J.O. Fl.gion 3, Chicago, Office of the Director. 79/02/09 

P. 

7908270343 DDCKET 30-233 Palisade. Nuclear Plant 

Limit Switch Lubricant"" 79 " 03 ' " Llmi tDpqu> Valvs 0red 

KEPPLER, J.Q. R.gion 3, CNlcajo. Office of the Dimeter. 79/02/09. 

790B8301B1 DOCKET BQ-83S PalUadei Nuclear Plant 

^.r^? 13 5 1 770I ' 1 ltrs T-equastlnu reviBlon^orTec/Bjec"" 
in*rvicn imp proeram. Ril lf r.queats included for .pecial 
caiei, RequB. t. rvieu prior to Jun* 1779, 
HOFFMAN. D. P. Cor.umen Power Co. 79/02/21. olpp. 

7908190884 DOCKET 30-23S Pali.ade. Nuclear Plant 
Forward* monthly operating rept for Jan 1979. 
ADAMS, U. E. Consumer. Poiuer Co, 79/02/07. Ip. 

790B1308B9 DDCKET 30-285 PalUade* Nuclear Plant 
Monthly operating rept for Jan 1979. 
BODTKE.P.J. Coniumin Power Co. 79/03/07. 4pp. 

7908E301BB DOCKET 80-235 Palisade. Nuclear Plant 

^rrr"' """=*" ' n *!r n ' lB . NDl " N^itorlng Te.ti" cov.riro 



M " mnn " - 

HOFFMAN, D. P. Coniumen Pouior Co. 79/02/80. 



Ip. 



79023803B3 DOCKET 50-833 Pali. ad.. Nuclear Plant 

iS5S*, P S? h* pt f (:hfln l""' t "* fc Piriment. p.rform.d in 
197H which are reportabl. und^r tOCfltSO. S9(b.). Include* mods 
to &oronomtr f poiion rod* b electrical ly*. 
HOFFMAN, D. P. Comiimeri Pouinr Co. 79/03/88. 7pp. 

7908200034 DOCKET 30-258 Paliiadei Nuclr Plant 

Follouup rept informino that fire pump, uere dlaablvd SB 

!in W u? *J! OU1 lMl "** Dn of brtf '< B " line at cooling 

.? ?^ i" B J "S," 1 *" pUlrp Ut "" M.r pumpi uer. 

ri,.?^ iniDV " rt ""tlM renovad from ve individual lu. 

LEWIS, J.O., PETITOEAN.O. H. . Con. umnri Power Co. 79/O1/19. Ip. 

7902200011 DOCKET BO-SSB Pali.ade. Nuclegr Plant 

Confirm, verbal rept of repartablf. occurrence on 790125- 
durina preparation, for local leak rat teat of pei-ionnel 
air lock, a preisure gauge normally connected to 1/4 inch 
,l,;i nfl , w ** found iii"lna,cratlni l*ah path. 
LEWIS, J.O. Cnnumtr Pouer Co. 79/O1/23 Ip 



DOCKETED ITEMS 



iping 
tie 



7902030173 DDCKST SO-39S Paliiades Nuclear Plant 
Forwards LESs 79-OO3/01T-0 & 79-004/01T-0. 
HOFFMAN, D. P. Consumers Poiuer Co. 79/01/31. lp. 



7902090176 DOCKET SO-Z55 Palisades Nuclear Plant 

LER 79-003/O1T-0 on 7901 17: fit ting in fire protectior 
for "A" cooling tower broke. Resulting leakage could r 
isolated! f ire pumps placed in manual. Break caused by 
freeiing weather conditions. 
ConiumBr* Power Co. 79/01/31. lp. 



7903050179 DOCKET 30-233 Palisades Nuclear Plant 

LER 79-004/01T-0 on 79O117:svc water pump P-7D taken out-of- 
servlce w/o pnior test of dieiel generator 1-2. Caused by 
combination of poor judgment & lack of awareness of Tech 
Spec requirement! by shift operating personnel. 
Consumer* Power Co. 79/01/31. lp. 



79O20fi0333 DOCKET 50-355 Palisades Nuclear Plant 
Forwards LERs 79-001/03L-0 t. 79-002/03L-0. 
HOFFMAN, D. P. Consumers Pouier Co. 79/O2/01, lp. 



7902060334 DOCKET 9O-255 Palisades Nuclaar Plant 

LER 79-OOI/03L-Q on 790102: reactor protection sys power 
range channels NIOS, 06 !> 07 bypassed w/o first tripping 
NtOB, Caused by failure to use administrative controls. 
* Consumers Poiuer Co, 79/02/01. 2pp. 



7902060333 DOCKET 3O-255 Palisades Nuclear Plant 

LER 79-003/03L-0 on 790103: steam generator specific 
conductivity increased tn 7.63 micro-mho per cm. Steam 
generator rate Increased b morphol ine/hydrai ine feed rate 
decreased. Caus Bd by air in leakage to main condenser, 
* Consumers Power Co. 79/02/01. IP, 



7903060315 DOCKET 50-235 Palisades Nuclear Plant 
Foriuards LER 79-003/03L-0. 
HOFFMAN, D. P. Consumers Power Co. 79/02/O2. lp. 



7902130167 DOCKET 3O-239 Broun* Ferry Nuclear Power Station, Unit 1 
Fnrwards Endorsement 46 re change* in subscribing companies 
& their proportionals liability endorsement to NEL1A Policy 
NF~19a. 
FIELDER, J. Marsh S. McLennan, Inc. 79/02/06. 2PP. 

7902S6030B DOCKET 30-359 Drowns Ferry Nuclear Pauier Station, Unit 1 
Forward! Endorsement 39 to MALEU Policy MF-66. 
DUCK, J. R. Marsh (. McLennan, Inc. 79/O2/19. 2PP. 



7902260362 DOCKET 50-239 Browns Ferry Nuclear Pouier Station. Unit 1, 

Summary of BUR venting procedures & practices. 

LONO.F.J, Region 2, Atlanta, 
2pp. 



Office of the Diroctor. 73/04/17, 



790214O21B DOCKET 90-S39 Browns Ferry Nuclear Power Station, Unit 1 
Forwards binders !c sets of divider tabs fop use ul/MEDD-21888 
"Mark 1 Containment Program Load Definition Rept. " 
SOBON.L.J. General Electric Co, .Nuclear Energy Products Dtv. 
79/01/OB. 8pp. 

7902030001 DOCKET 30-239 Browns Ferry Nuclear Power Station, Unit 1 
Notification of 790117 meeting ui/TVA & <3E to discuss 
electrical design of rec irculation pump trip sys. 
CLAflKjR. Operating Reactors Branch 3, 79/01/17. ip. 

790SQ60013 DOCKET 50-239 Browns Ferry Nuclear POWBT Station, Unit II 
Forwards Amand fl7 to License DPR-33, safety evaluation Sc 
notice of issuance. Informs that credit for rec irculation 
pump trip sya i* not included in operating limit mill 
critical power ratios. 
IPPOLITD, T. A. Operating Reactors Branch 3, 79/01/17. 2pp. 

7902060016 DOCKET 30-339 Drowns Ferry Nuclear Pouier Station, Unit 1 
Amend 47 to License DPR-33 changing Tech Specs to permit 
plant operation in Cycle 3 following current refuelino. 
outage, 
IPPOLITD, T. A. Operating Reactors Branch 3. 79/O1/17. S3pp. 



7902060318 DOCKET BO-2B3 Palisades Nuclear Plant 

LER 79-003/03L-0 on 790103: 1/4-inch drain line in diesal 
generator fuel syi broke, spraying 100-130 gal of fuel oil 
onto engine. Caused by vibration. 
* Consumer* POWBT Co. 79/03/02. Ip. 



7902060018 DOCKET 50-239 Browns Ferry Nuclear Pouier Station, Unit 1 
Safety evaluation supporting Amend 47 to License DPR-33. 
Discusses nuclear characteristics, thermal-hyttraul ice, 
accident & overpressure analys.is EC physics startup besting. , 
Recommends issuance of amend. 
Office of Nuclear Reactor Regulation. 79/01/17, 10pp. 



790214019Q DOCKET 30-25-3 Palisades Nuclear Pla 
Foriuards L6R 79-Q06/O1T-0. 
HOFFMAN. P.P. Consumers Power Co. 79/O2/OB. 



7902060022 DOCKET 30-299 Browns Ferry Nuclear Power Station, 
Hot! co of Issuance of Amend 47 to License DPR-33. 
IPPOL1TO,T. A. Operating Reactors Branch 3, 79/O1/17. 



8pp. 



7903140194 DOCKET 30-253 Palisades Nuclear Plant 

LEfi 79-006/01T-0 on 790129: during preparation for lea* 
testing personnel air lock. found pressure gauge normally 
mounted on outer door of air lock tuas mi siing. Caused by 
procedures not specifying gauge replacement after removal. 
* Consumers Power Co. 79/02/08. lp. 



79022B03B5 DOCKET 50-259 Browns Ferry Nuclear Power Station. Unit 1 
As followup to NRC 781113 request for submittal of Offsite 
Dose Calculation Manual for approval, forwards guidelines for | 

general contents of manual, 

GRIMES, O.K. Assistant Dlroctor for Engineers It Projects. 

SANQER.H. B. Tennessee Valley Authority. 79/01/18. 8pp. 



7902220004 DOCKET 30-25-3 Palisades Nuclear Plant 
Forwards LER 79-007 /O3L-0. 
HCFFMANjD. P, Consumers Power Co. 79/02/13. lp. 



7902220007 DOCKET 50-233 Palisades Nuclear Plant 

LER 79-007/03L-0 on 7901 IS: primary computer stopped. Caused 
by computer program fai lure. Computer reprogrammed to restore 
operabi lity. 
* Consumors Power Co. 79/02/13. lp. 



7902240*07 DOCKET 50-255 Palisades Nuclear Plant 
Forwards LER 79-001/Q3X-1. 
HOFFMAN. D. P. Consumers Power Co. 79/02/20. lp. 



7902020265 DOCKET 30-259 Brouins Ferry Nuclear Power Station. Unit i 
Discusses controversy re use of REDY or ODVN transient 
codes. Util plans to use new ODYN cadeiaiiumes they have NRC 
concurrence to do so. Requests to be informed by 790E05 if 
assumption is erroneous, 
01LLELAND, J. E. Tennessee Valley Authority. 79/01/29. lp. 

7902220257 DOCKET 80-259 Browns Ferry Nuclear Power Station, Unit 1 
Responds to 790111 request fur review of papvr "Vent 
Clearing During Simulated LOCA in a Mark I BUR 
Pressure-Suppression Sys. " Recommends paper be acceptod for 
puol icatlon. 
ORIMES, C. Plant Systems Branch, 79/01/31. 2pp. 



790B260412 DOCKET 30-255 Palisades Nuclear Plant 
LER 79-OOI/03X-1 on 790102: admini strative controls 
inadequate during supposed bypass of range channels w/o 
trip. Caused by lack of reminder re status of tt requirements 
for tasting ch-annel*. Firmer control* used for bypass keys. 
* Consumers Power Co. 79/02/30. IP. 

7902260464 DOCKET 50-335 Palisades Nuclear Plant 
Fc-nuards LER 79-OOS/O3L-0. 
HOFFMAN, 0, P. Consumers Power Co. 79/02/21. lp. 

7902260467 DOCKET 30-E35 Palisades Nuclear Plant 

LER 77-OOB/03L-0 an 790126: tank vint valve (CV-3051 ) opined 
simultaneously m/MS fill valveitank pressure dropped below 
Tech Specs limit. Caused by electrical short between mires 
for fill & vent valves. 
* Coinumer-s Power Co. 79/02/21. lp. 

7903220119 DOCKET SO-259 Browns Ferry Nuclear Powar Station, Unit 1 
Informs that TRftDOC Pamphlet 380-30, "Interservlce Procedures 
for Instructional Syi Development" referenced in (JUREQ-0219 
is available in microfiche form from NRC. 
BESAW.W.J. Division of Document Control. 79/01/09, 2pp. 



7902030195 DOCKET SO-2B9 Browns Ferry NueUar Power Station, Unit 1 
Submits Dec 197B program activity review, comprised of info 
from selected sections of monthliy rapt. w/sectlon on contract 
It billing' status removed. Lists meetings held !< provide- 1 
tasi-by-task activity summary. 

SOBON.L.J. General Electric Co. , Nuclear Energy Products Dlv. 
79/02/05, 10pp. 

7902120207 DOCKET 90-259 Brouns Ferry Nuclear Power Station, Unit 1 
Responds to verbal request for Info in support of proposed 
license amend to permit Cycle 3 operation w/oparatlng credit 
allout-d for installed end-of-cycle recirculatlan pump trip 
sys. Justifies safe operation u/redueed reactor power Isvel. 
01LLELAND, J, E. Tennessee Valley Authority. 79/02/03. 2pp. 

7902130094 DOCKET 30-259 Browns Ferry Nuclear Power Station, Unit 1 

Submits summary technical rcpt on secondary containment laak 

rate testing an 781127. 

OILLELAND, J. E. Tennessee Valley Authority. 79/OB/09. lp, 



DOCKETED ITEMS 



7902130097 DOCKET 50-289 Browns Ferry Nuclear Power Station, Unit 
Remit* ti analysis of 7B1127 secondary containment leak rate 
tut. Bhow* lecondary containment capability to main 1/4 inch 
water vacuum under calm wind w/sys In leakage rate of not 
ora that 12.000 icfm before refueling. 
* Tennanee Valley Authority. 79/03/09. 23pp. 



26 



7908330009 DOCKET 90-239 Browns Ferry Nuclear Pouer Station, U 
Reipondi to NRC 79010B Itr re violation* noted in IE Intp 
Hepts 90-299/-7B-34. 5Q-260/7B-37 t SO-29&/7B-33. Correc tive 
actions: training session! conducted reemphaslng security 
emp loyees ' responsibHtiea. 
QILLELAND, J. E. Tennessee Valley Authority. 79/01/31. 2pp.. 



79022B0314 DOCKET SO-2S9 Brouni Ferry Nuclear Power Statidn, Unit 1 
Forwsrdi topclal rept! r* lattice physics methods d core 
ilnulation!. 
OILLELAND, J. E. Tenneiiee Valley Authority. 79/02/20. 4pp. 

79022B0320 DOCKET 80-239 Drowns Ferrg Nuclear Power Station. Unit 1 
"Verification of TVA Steady-State BWR Phyiici Methoda, " 
Tennenee Valley Authority. TVA-TR79-01. 79/01/31. 130pp. 

79022B0330 DOCKET BO-239 Browns Ferry Nuclear Power Station. Unit 1 
"Method* for Lattice Physic* Analysis of LHB'i. " 
DARNELL, B. L. , BEU, T. D. , PERRY, 0. W. Tennesiaa Valley Authority. 
TVA-TB7B-02. 7B/04/ 1 5. 1 BOp p . 

7902290339 DOCKET 30-239 Browns Ferry Nuclear Power Station, Un.it 1 
"Thret-Dimensional LMR Core Simulation Methods. " 
FORKNEfl/S.L. , MERIHETHER, 0. H. , DEU, T. D. Tennessee Valley 
Authority. TVA-TR7B-03. 7B/06/01. BOpp. 

79022B0316 DOCKET 30-239 Drowni Ferry Nuctear Pouiar Station, Unit 1 
Ac I recaipt of NRC 7B0711 request for proposed Tech Bpecs 
for facility uhlch would incorporate 10CFR30. Requests 
extension of time until 790701 for *ubmittal. 
OILLELAND, J. E. Ttnnenee Valley Authority. 79/02/B3. lp. 

7902270143 DOCKET 80-239 Brouni Ferry Nuclear Power Station, Unit 1 
Forward! IE Imp Rptl 30-239/78-31,90-260/78-36 tc 
80-296/78-34. No noncomp lianci noted. 

LOWO, F. J. Region S. Atlanta. Reactor Operations Nuclear Support 

Branch. 79/01/04. 2pp. 

79022701M DOCKET 50-239 Broiuns Ferry Nueltar Pouier Station, Unit 1 
IE Imp Rapt. 30-239/78-31. 50-260/7B-3i t. 30-296/70-34 t. on 
79121B-IA. No noncompliance noted. Major areas inipectd; 
operator r*qualif Ication training program fc formal training 
tc retraining program for non-licensed plant peraonnal. 
BRADFORD, H. H. . TAYLOR, P. A. , KELLQOO, P. J. Region 2, Atlanta, 

Reactor Operation! Nucltar Support Branch. 79/01/03. 4pp. 

7902200490 DOCKET 30-289 Brouni Ferry Nucliar Pouir Station, Unit 1 
Forward * IE Inp Repts 80-S89/7B-3t. tc 50-29i/79-36 on 
701224-29- No noncoMpl lance noted. 

LONOiF.J, Reflion 2, Atlanta, Reactor Operations Nuclear Support 

Branch. 79/01/12. 2pp. 

79022BO4&3 DOCKET 80-289 Brouni Ferry Nuclear Pouier Station, Unit 1 
IE Imp Repti 80-289/7B-36 fc 30-a9i/7B-36 on 7B1B26-29. No 
noncompliance not*d. Major ar inipected: records of poit 
refueling teiting actlvitiit conducted on Unit 3 during Oct 
I. Nov 1978. 

JULIAN,C., FOfiD.E., MARTIN.R.D. Region E. Atlanta, Reactor 

Operation. Nuclear Support Branch. 79/01/11. 9pp. 

7902120090 DOCKET 90-239 flrount Ferry Nuclear Poumr Station, Unit 1 
Forward! IE Info Notiea 79-01, "Bergen-Patenon Hydraulic 
Bhock h Bway Arreitori (HSBA). " 

O'REJLLY. J. P. Renian 2, Atlanta, Office of the Dlroetor. 

79/02/02, Spp. 

790B1200S9 DOCKET 80-239 Brouin* Ferry Nuclear Pouer Station, Unit 1 
IE Info Notice 79-01, "Bflrgen-Paterion Hydraulic Shock b 
Suay Amitari <HSSA>". ReptB fallurai of units to lockup 
In compranlon direction, u/poppet valve ti seat damage. 
No reipome raqulred at thli time, 
Office of Inspection fc Enforcamnt. 79/OH/OS. 2pp. 

790213003B DOCKET 50-239 Brount Ferry Nuclear Power Station, Unit 1 
Forward t IE Bulletin 79-Ot, "Environ Qualification of Clan 
IE Equipment. " 

O'REILLY, J. P. Region B, Atlanta. Office of the Director. 

79/02/03, 2pp. 

7902210164 DOCKET 80-289 Broun* Ferry Nuclear Power Station, Unit 1 
Forward* IE Bulletin 79-01. "Environ Qualification of Clan 
IE Equipment." W/lilt of It yttematlc evaluation program 
plants for which no action t* required. 

O'REILLY, J. P. Region 2, Atlanta, Offlci of tin Director. 

79/02/08. Spp, 

7702230002 DOCKET 90-B39 Brauni Ferry Nuclear Power Station, Unit 1 
Ack receipt of 790131 Itr informing NRC of stepi takin to 
correct violation! noted In IE Imp Repti 50-299/7S-34, 
80-2iO/7B-37 c SO-29A/7B-38. 
KENNA, W. B. Region 2, Atlanta, Safeguard! Branch. 7<f/OSfOB. lp. 



7903230007 DOCKET 50-239 Broiunt Ferry Nuclear Pouer Station, Unit 1 
FaruiordB IE Insp Rept 90-399/78-34,90-260/78-37 t 
90-296/78-35 on 7B131B-19 fr notice nf violation. 
KENNA, W.B. Region 2. Atlanta, eafeouaTds Branch. 79/01/08. 

Spp. 

790223000B DOCKET 50-299 Drouns Ferry Nucloar Powor Station, Unit 1 
Mattel nf violation from inap On 7S1S1B-19. 
Region 2, Atlanta, Office of the Director. 79/01/OB, 3pp. 

7902230009 DOCKET 90-299 Broiuns Ferry Nuclear Pnuer Station, Unit 1 
IE Inp Rept 90-339/78-34,90-260/78-37 t. SO-E96/7S-3& on 
78121B-19. NoncompliancB noted: failure to search per^nnnel 
tt hand-carried package. 

BESECKER, K. H. , FUCHKO, d. M. , OILLESPIE, F. P, Region 2. Atlanta, 

Safeguards Branch. 79/OI/OB. 3pp. 

79022Q013* DOCKET 80-299 Oroiiina Ferry Nuclear Pouer Station. Unit 1 
Forward* IE Info Notice 79-03. "Liffii torque Valve Beared 
Limit Suitch Lubricant. " 

O'REILLY, J.P, Region 2, Atlanta, Office of the Director. 

79/02/09. 2PP. 

79022B0341 DOCKET 90-2B9 Drowns Ferry Nutkear Power Station. Unit 1 
Roipondi to 79020S Itr which forumrded IE Bulletin 79-O1. 
"Environ Qualifications of Clais IE Equipment." Explains 
usage of item-mounted limit suitchei. Believes *afe operation 
i* not compromisEd in any uay. 
OILLELAND, J. E. TennessaB Valley Authority. 79/02/23, lp. 

7902130093 DOCKET 50-299 Brouns Ferry Nuclear Power Station, Unit I 
Forwards monthly operating rept for Jan 1979. 
DEUEASE-J.O. TennetBBB Valley Authority. 79/02/09. tj. 

7902130093 DOCKET 30-859 Browns Ferry Nuclear Pouier Station, Unit 1 
Monthly operating rept for Jtm 1979. 
DEWEA8E.O. Tannise Valley Authority. 79/01/31. 35pp. 

7902060229 DOCKET 30-259 Browns Ferry Nuclear Power Station, Unit I 
Forward! LER 79-001/01T-0. 
FOX.H.8. Tennenee Valley Authority. 79/01/31. lp. 

7902060239 DOCKET 90-239 Brouins F*rry Nuclear Power Station, Unit 1 
LER 79-001/01T-0 on 790118; reactor scrammed due to High flu* 
actuating intermediate range monitor high-high neutron 
monitoring circuiti reactor neared crltlcalltu. CamBd by 
wlthdraul of high reactivity worth rod. 

* Tennetiee Valley Authority. 79/01/31. 2pp. 

7902330121 DOCKET 50-339 Browns Furry Nuclear Poiuer Station, Unit 1 
Forwards LER 79-003/01T-0. 
FDX.H.S. Tennessee Valley Authority. 79/02/16. lp. 

7902230127 DOCKET 80-299 Brouni Furry Nuclear Power Station. Unit 1 
LER 79-003/01T-0 on 7901SO: total leal rate exceeded 
allowable percentage. Caused by exoiilve leakage by valve 
iBatlng surface*. 

* Tennessee Valley Authority. 79/02V14. 3pp. 

7902370334 DOCKET OO-B99 Broun* Ferry Nuclear Pouier Station, Unit 1 
Forward! LER 79-002/03L-0. 
FOX.H.a. Tennessee Valley Authority. 79/02/20. if. 

7902270393 DOCKET 30-259 Browni Ferry Nuclear Power Station, Unit 1 
LER 79-002/03L-O on 790129: during normal operation uihilo 
performing surveillance test, standby liquid control pump IB 
relief valve opned below Tech Spec mln. Caused by valve seat 
*urface deterioration. 
Tennessee Valley Authority. 79/03/H. 2pp. 

7902880119 DOCKET 30-260 Browns Ferry Nuclear Power Station. Unit 2 
Inform* that TRADOC Pamphlet 350-30, "Intrservice Procedures 
for Instructional 8ys Development" referenced in NUREO-0319 
is available In microfiche form from NRC. 
BEBAH, W, J. Division of Document Control. 79/01/09. Bpp. 

7902120167 DOCKET 50-260 Browns Ferry Nuclear Power Station. Unit 2 
Forwards Endorsement 46 re chang" 1" subscribing companies 
b their proportionate liability endorsement to NELIA Policy 
NF-19B. 
FIELDER, J. Marsh I. McLennan, Inc. 79/02/06. 2PP. 

790226030B DOCKET 30-260 Browns Ferry Nuclear Pouer Station, Unit 8 
Forwards Endorsement 39 to MALEU Policy MF-6.6. 
DUCK, J. R. Mar*h Ic McLennan, Inc. 79/O2/19. SPP. 



26 

79O214Q21B DOCKET 30-360 Browns Furry Nuclear Pouar Station. Unit 3 
Forwards binders & sett of divider tabs for use W/NEDO-21BB9 
"Hark 1 Containment Program Load Definition Rept. " 
SOBQN.L. J. General Electric Co., Nuclear Energy Products Div. 
79/01/OB. 0pp, 



DOCKETED ITEMS 



7902120030 DOCKET 30-260 Brownfi Ferry Nuclear Power Station, 
Forward* IE Info Notice 79-01 , "Dergen-Pateron Hydraulic 
BhocV & Suiay Arrestors <H8BAI." 

O'REILLY. J. P. Region 2, Atlanta. Office of the Director. 

79/O2/02. 2pp, 



79022B03B3 DOCKET 30-240 Browns Ferry Nuclear Power Station. Untt 2 
As follouup to NRC 7B1115 request for lubmittal of Offaite 
[>Qie Calculation Manual for approval, forward* guidelines For 
general contents of manual. 

QRlMES.n.K. Assistant Director for Engineers !, Projects. 

SANSER.H. B. TenmetEee Valley Authority. 79/01/1B. 3pp. 

7902020263 DOCKET 30-260 Brouins Ferry Nuclear Pouer Station, Unit S 
DixulKS controversy re use of REDY or QDVN transient 
codes. Util plans to use new ODYN codei assumo* they have NHC 
concurrence tp do in. Requests to be informed by 750205 if 
assumption Is erroneous. 
QILLELAND. J. E, Tennessee valley Authority. 79/01/29. lp. 

7902220357 DOCKET 30-260 Browns Ferry Nuclear Pouior Station. Unit 3 
Responds to 790111 request for review of paper "Vent 
Clearing During Simulated LOCA in a Hark I BUR 
Pressure-Suppress i on By*." Recommends paper be accepted for 
publication. 
OR1HEB, C. Plant Systems Branch. 79/01/31. 2pp. 

7902080195 DOCKET SO-260 Browns Ferry Nuclear Power Station. Unit 2 
Submits Dec 1973 program activity review, comprised of info 
from selected sections of monthly rept, a/section on contract 
h billing status removed. Lists meetings held 8. provide* 
task-by-task activity summary. 

SOBDN.L.J, General Electric Co. .Nuclear Energy Products Div. 
79/02/03. 10pp. 

7902130199 DOCKET 5O-260 Droiun* Ferry Nuclear Power Station, Unit 2 
Forward i requested amend to License DPR-32. Determines 
proposed amend to be Class 3. because It involves a single 
safety Isiue u/nn significant hazard consideration, 
Remittance being ulred to NRC. W/encl justification. 
OILLELAND. J. E. Tennessee Valley Authority. 79/02/09. 2pp. 

7902130200 DOCKET SO-26O Drowns Ferry Nuclear Power Station, Unit 3 
"Buppl Reload Licensing Submlttal" presented as 
justification for proposed amend change*. 

ERVIN.A. M. Central Electric Co. .Nuclear Energy Products Div. 
KEDQ-24169. 79/01/31. 25pp. 

7902260342 DOCKET 5Q-260 Brouins Ferry Nuclear Power Station. Unit 2 

Summary af BUR venting procedures & practices. 

LONQ.F. J. Reaion 2, Atlanta, Office of the Director. 73/04/17. 

2pp. 

79O22B0314 DOCKET 90-260 Drowns Ferry Nuclear Power Station. Unit S 
Forward! topcial repts re lattice physics methods !< core 
stimulations. 
GILLELAND. J. E. Tennessee Valley Authority. 79/02/20. 4pp. 

7902260330 DOCKET 50-260 Browns Fsrry Nuclear Pouer Station. Unit S 
"Verification of TVA Steady-State BUR Physics Methods." 
Tenn9e Valley Authority. TVA-TR79-01. 79/01/31. 130pp. 



790213003B DOCKET 30-26O Drowns Ferry Nuclear Power Station, Unit 2 

Forwards IE Bull etin .79-01. "Environ Oual if Ication of Cla*s 
IE Equipment. " 

O'REILLY. J. P. Region 2. Atlanta. Office of the Director. 

79/02/03. 2pp. 

7902210164 DOCKET 30-260 Browna Ferry Nuclear Power Station. Unit 2 
Forward* IE Bulletin 79-01. "Environ Qualification of Clan 
IE Equipment." H/li*t of 11 systematic evaluation program 
plants for which no action Is required. 

O'REILLY, J. P. RBgion 2. Atlanta, Office of the Director. 

79/02/08. 2pp. 

7902230002 DOCKET BO-260 Browns Ferry Nuclear Power Station, Unit 2 
Ack receipt of 790131 Itr Informing NRC of steps taken to 
correct violations noted In IE IIIBP Repts 30-239/78-34, 
50-260/78-37 fc 50-E96/7B-3B. 
KENNA.H.B. Reoion 2. Atlanta, Safeguards Branch. 79/OH/OB, lp. 

7902830005 DOCKET 30-260 Browns Ferry Nuclear Power Station. Unit 3 
Responds to NRC 7901 OB Itr re violation* noted In IE Insp 
Rept* 00-239/76-34,30-260/78-37 S. 50-296/70-30. Corrective 
actions: training se**lon* conducted reemphaiing lecurity 
employee* ' responslblltles. 
OILLELAND. J. E. Tennessee Vnllay Authority. 79/O1/31. 2pp. 

7902230007 DOCKET BO-260 Browns Ferry Nuclear Power Station. Unit 2 
Forwards IE Insp Rpt 30-239/73-34.30-260/78-37 & 
30-296/7B-35 on 781218-19 d notle* of violation, 
KENNA.W.B. Region B. Atlanta, Safeguard* Branch. 79/01/OB. 

2pp. 



7902230008 DOCKET 30-260 Browns Ferry Nuclear Power Station. 
Notice of violation from Imp an 781218-19. 
Region 2, Atlanta. Office of the Director. 79/01/08. 



3pp. 



7902230009 DOCKET 30-260 Brown* Ferry Nuclear Power Station. Unit S 
IE Insp Hept 3Q-239/7B-34. 50-260/78-37 fc 30-296/70-33 on 
781218-19. Noncompllance noted; fai lure to inarch ptrconnal 
Si hand-carried package. 

BEBECKERrK. H. , FUCHKD. J. M. . OILLE8PIE. F, P. flaoion2, Atlanta, 

Safeguard* Branch. 79/O1/OB. 3pp. 

7902280134 DOCKET 30-560 Browns Ferrg Nuclear Power Station* Unit S 
Forward* IE Info Notice 79-03, "Llmltorque Valve Seared 
Limit Switch Lubricant. " 

O'REILLY, J. P. Region 2, Atlanta. Office of tho Director. 

79/02/09. 3PP. 

77022B0341 DOCKET 30-260 Browns Ferry Nuclear Power Station. Unit a 
Respond* to 790208 Itr which forwarded IE Bulletin 79-01. 
"Environ Qualifications of Clan IE Equipment." E>plaln 
usage of t tin-mounted limit iiultchii. Believe* >afe operation 
1* not compromised in *ny way. 
OILLELAND. J. E. Tennessee Valley Authority. 79/08/23. lp. 



79022S0330 DOCKET 30-260 Brouins Ferry Nuclear Power Station, Unit 2 
"Method* for Lattice Physics Analysis of LWR's, " 
DARNELL, D. L. , BEU, T. D. . PERRY, 0. U. Tenne*se Valley Authority. 
TVA-TR7B-02. 7B/04/1S. 130pp. 

7902280339 DOCKET 50-260 Browns Ferry Nuclear Pouer Station. Unit 2 
"Three-Dimensional LUR Core Simulation Methods. " 
FOHKNER.B.L. , MERIHETHER. 0. H. . BEU, T. D. Tenne*se Valley 
Authority. TVA.-TR7Q-03. 78/06/01. BOpp. 

79022B0316 DOCKET 3O-260 Broun* Ferry Nuelaar Power Station, Unit 2 
Ack receipt of NRC 7B07U request for proposed Tech Specs 
for facility which would incorporate IDCFfiSO. Requests 
^tension at tima until 790701 for siibmittal. 
OILLELAND, J. E. TannesstC Valley Authority. 79/02/23. lp. 

7902370143 DOCKET 30-260 Broiun* Ferrg Nuclear Power Station, Unit 2 
Forwards IE Inp Repts BO-2S9/7B-31, 30-260/7B-36 t, 
30-296/78-34. No noncamplianc* noted. 

LQNQ.F.J. Region 2> Atlanta, Reactor Operation* Nuclear Support 

Branch. 79/01/04. 2pp. 

7902270104 DOCKET 30-260 Brown* Ferry Nuclear Power Station. Unit 2 
IE In*p Rept* 30-239/7B-31, 30-260/78-36 (< SO-S96/7B-34 b on 
781212-14. No noncompliance noted. Major areas inspected: 
operator nullification training program b formal training 
& retraining program for non-licensed plant penannel. 
BRADFORD, W. H. , TAYLOR. P. A. i KELLOOO, P. J. Region 2, Atlanta. 

Reactor Operations Nuclaar Support Branch. 79/01/03. 4pp. 



7902130093 DOCKET 30-860 Browns Ferry Nuclear Pouier Station, Unit 2 
Forward* monthly operating rept for Jan 1979, 
DEMEA6E.J.Q. Tennessee ValUy Authority. 79/02/09. lp. 

7902130093 DOCKET 50-260 Brown* Ferry Nuclear Pouir Station. Unit 2 
Monthly operating ropt for Jan 1979. 
DEWEABE.J. Tnn Valley Authority. 79/01/31, 33pp. 

7903130190 DOCKET 30-260 Broumt Ferry Nuclear Pouer i Station, Unit B 
Forwards LER 79-001 /03L-0, 
FOX. H, B. Tenneisee Valley Authority. 79/02/09. lp. 

7902130193 'DOCKET BO-260 Browns Ferry Nuclear Power Station, Unit tt 
LER 79-001/03L-0 on 7901 13: durlno test of hlgh-pr*uri 
injection coolant sys, steam >upply valve FCV-73-16 failed to 
open, rendering sy* Inoperative. Caused by Failure of 
llfflltorquo valve operator limit switch. 
* Tennescee Valleg Authority. 79/02/08. 2pp. 



7902220119 DOCKET 30-261 H. B. Roblnion Plant, Unit S 

Inform* that TRADDC Pamphlet 330-30, "lnterervlce ?rgcedurtt 
for Instructional Sys Development" referenced In NUREO-O219 
Is available in microfiche form from NRC. 
BEaAW.H.d. Division of Document Control. 79/01/09. 2pp. 

790B140204 DOCKET HO-261 H. B. Robinson Plant, Unit'B 

Respond! to 781109 requet that tmergencg plan be reviled to 
Incorporate NRC recommendations. Attachment 1 li a detailed 
response to NfiC positions S, Attachment 2 is the revised 
emergency plan. i 

UTLEY.E. E. Carolina Power b Light Co. 79/02/06. 3pp. 



DOCKETED ITEMS 



27 



7902140207 DOCKET 30-261 H. B. Robin. on Plant, Unit 2 

Emergency plan for facll 1 ty. Detai Is actions necessary tn 
protect personnel at set Forth by 10CFR80 b to gain contrc 
of & limit consequences of emergency situation. 
Carolina Power It Light Co. 79/03/06. 71pp. 

790226056B DOCKET 50-261 H. B. Robinson Plant, Unit 2 

Second monthly status rapt on Buppl 3 to BER. Resolution of 
open Items on schedule. Meteorological issue nouj resolved. 
Analysis of generic safety questions to be completed uithtn 
on* month. 
LEWIS, S. H. Branch 2. 79/01/26, Ip. 



79Q20B0212 DOCKET 30-261 H. Q. Robinson Plant, Unit 
Forwards Endorsement 56 NEL1A Pollcg NF-1BO. 
OR AH AN i W. E. Carolina Power & Light CD. 79/02/01. 



2pp. 



79020B0221 DOCKET 30-361 H. D. Robinson Plant. Unit 2 

Forwards Endorsement 2 to NEL1A Binder EB-21 t, MALEU Binder 

XB-21. 

GRAHAM, H.E. Carolina Pouier (. Light Co, 77/03/01. 5pp, 



7902130130 DOCKET 90-361 H. 
Forward* LER 79-002/03L-0. 
FURR, B. J. Carolina Power & Light CD 



Robinson Plant. Unit 2 
79/02/09. Ip. 



7903130151 DOCKET 30-261 H. B. Robinson Plant, Unit 2 
LEH 79-002/03L-0 on 7901 1 1 : during normal operation, one 
emergency suitchgear rpom smote detector rendared inoperablt 
duo to ecessive amount of dust entering detector head. 
BTARKEV, R. B. Carolina Poiuer t Light Co. 77/OH/09. 2pp. 

790326Q3B3 DOCKET 30-361 H. B. Robinson Plant, Unit 2 
Forwards LER 79-004 /03L-Q, 
FURH, B. J. Carolina Power b Light Co. 79/O2/I9. Ip. 

79023603B3 DOCKET 50-361 H. U. Robinson Plant, Unit 2 

LER 79-004/03L-0 on 790137: during Full power operation, tun 
drilled, unsealed & unattended 3 inch conduit penetrations 
wore found In E1-E2 Room south wall. Caused by canst 
personnel failure to seal penetrations. 
9TARKEY, R. B. Carolina Poiuer & Light Co. 79/02/19. 2pp. 



790S2B0279 DOCKET 50-361 H. fl. Robinson Plant. Unit 2 
Forwards Endorsement 13 to MAELLJ Policy MF-19. 
GRAHAM, W. E. Carolina Power EC Light CD. 79/02/23. 2pp. 

790B260Z33 DOCKET 90-261 H. B. Robinson Plant, Unit 2 
Forwards summary of PUR purging & venting experiences, 
8EVFRIT,K.V. Region 4, Dallas, Office of tho Director. 

4pp. 



79022B03B3 DOCKET 30-261 H. B, Robinson Plant. Unit 2 

A* folloiuup to NRC 781115 request for subtnittal of Offslte 
DOIB Calculation Manual for approval, forwards guidelines for 
general contents of manual. 

CRIMES, B.K. Assistant Director for Engineers t Projects, 

79/01/18. 3pp. 



7902220119 DOCKET SO-363 Monticello Nuclear Generating Plant 
Informs that TRADDC Pamphlet 350-30, " Intersorvic e Procedures 
for Instructional Sys Development" referenced In NUREG-O219 
is available in microfiche form from NRC. 
BE8AU, IJ, J, Division of Document Control. 79/01/09. 3pp. 

7903120180 DOCKET 30-263 Monticello Nuclear Generating Plant 
Responds to 790124 1 tr Identifying tuo alleged deficiencies 
in security plans. Bel leves items are not deficiencies t, 
that most recent revision to plan meet stds of 10CFR73. 35. 
MAYER, L,0. Northern States Power CD. 79/03/05. 3pp. 

7902190367 DOCKET 30-263 Monticello Nuclear Generating Plant 
Forwards detailed info on security plan Implementation. Enc 1 
withheld (rflF 10CFR2. 790(d ) , 
MAYER, L. 0. Northern States Pauier Co, 79/02/13. Ip. 



79022101B7 DOCKET SO-261 H. B. Robinson Plant, Unit 3 
Ear 11 ait date that util can make partial submittal of 
Radiological Effluent Tech Specs is 790312, Balanco of tnatl 
will be submitted as noon an available. Delay caused by time 
required to obtain info from consultants. 
UTLEV.E.E, Carolina Power 5i Light Co. 79/02/09. Ip, 



7903030147 DOCKET 50-263 Monticello Nuclear Generating Plant 
Forwards 7BI308 1 tr from UN Pollution Control Ag.ency 
requesting order bo Issued prohibiting installation of 
allegedly defective spent fuel ntorage racks !. hearing be 
held related to amend issuance. Federal Register notice encl. 
DENTON.H. Office of Nuclear Reactor Regulation, 79/01/17. 



2pp. 



7902230133 DOCKET 30-261 H. B. RobintDn Plant, Unit 2 
Restates commitment of QA program in light of recent 
issuance of Reg Guide 1.144, Jan 1979, "Audi ting of QA 
Programs for Nuclear Pouier Plants." 
UTLEY.E.E. Carolina Pouier fc Light Co. 79/03/14. 2pp. 



7902BB0090 DOCKET 30-261 H. B. Robinson Plant, Unit 2 

Forwards IE Info Notice 79-01. "fleroen-Paterson Hydraulic 
Shock 8( Ewau Arrestors (HB5A), " 

O'REILLY, J. P. Region 2, Atlanta, Office of the Director. 

79/02/02. 5pp. 



7902050131 DOCKET 50-363 Montliello Nuclear Generating Plant 
Request for Issuance of order prohibiting installation of 
allegedly defective spent fuel storage racks. 
DENTDN.H.R. Office at Nuclear Reactor Regulation. 79/01/17. 2pp. 

790205013S DOCKET 50-263 Monticollo Nuclear Generating Plant 
Request & motion for order prohibiting installation of 
defective spant fuel storago racks in violation of 
provisional operating license. Request to institute 
proceeding & petition to intervene. 
BTYENBvAAQi J. H. , OLEQN, J. F. Minnesota, State of. 7a/12/OB. 32pp. 



7902300013 DOCKET 30-261 H. B. Robinson Plant. Unit 3 

Forwards IE Bullatln 79-01, "Environ Qualification of Clasi 
IE Equipment. " 

O'fiElLLY. J.P. Region 3, Atlanta, Office of the Director. 

79/02/08. 6pp. 



79022B0243 DOCKET 50-261 H. B. Robinson Plant, Unit 2 

Forwards IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment. " 

O'REILLY, J.P. Region 2. Atlanta, Office of the Director. 

79/02/03. 6pp. 



7902150163 DOCKET 50-263 Nontlcello Nuclear Generating Plant 
Northern States Power response to A6LH 790113 memo t< order. 
Contends no unresolved safety issue re ATWB ti seeks 
dismissal of proceeding. W/affidavit of D Gilberts tr 
Certiflcato of 8vc. 
BILHERQ. J, E. Bhaw, Plttman. Pottfl, b Trowbridge. 79/01/Si. 



7902300003 DOCKET 30-263 Monticello Nuclear Generating Plant 
Annual premium endorsement for 1979, 
JOHNSON, R. G, Northern States Power Co. 79/02/03. 3pp. 



12pp. 



79022B003B DOCKET 50-261 H. B, Robinson Plant, Unit 3 
Forwards IE Info Notice 79-03. "Limltorque Valve Geared 
Limit Switch Lubricant." 

O'REILLY, J. P. Region 2, Atlanta, Office of the Director. 
79/02/09. 2pp. 



7902130070 DOCKET 30-261 H. D. Robinson Plant, Unit 2 
Forwards monthly operating rept For Jan 1979. 
FURR,B.J. Carolina Power fc Light Co. 79/02/09. Ip. 



7902270313 DOCKET 50-363 MonticBllo Nuclear Generating Plant 
Forwards Endorsement 49 to Policy NF-174 t< Endorsement 41 
to Policy NF-197 for calendar year 1979. 
JOHNSON, R. Q, Northern States Poujer Co. 79/03/21. 3pp. 

7903260339 DOCKET 90-263 MonticellD Nuclear Generating Plant 
Forwards Info on BUR venting practices. 

DANCE.H.C. Region 3, Chicago, Office of tho Director. 73/03/09. 
3pp. 



7902130073 DOCKET 30-261 H. B. Robinson Plant, Unit 3 
Monthly operating rept for Jan 1979. 
WATFDRD,M.L. Carolina Power * Light Co. 79/02/02. Spp. 

7902130392 DOCKET 30-261 H. B. Robinson Plant, Unit 2 
Forwards LER 79-001/O3L-0. 
FURR,B.J. Carolina Power l< Light Co. 79/02/08. Ip. 

7902130396 DOCKET 50-261 H. B. Robinson Plant. Unit 2 

LER 79-001/03L-0 an 7901 10: during full powor operation, high 
leakage alarm on "A" penetration pressurlier sys header was 
received. Caused by leakage through improper seals on 
personnel hatch inner door. 
STARKEV.R. B. Carolina Power !. Light Co. 79/02/OB. 3pp. 



7902140218 DOCKET 30-263 Monticello Nuclear Generating Plant 
Forwards binders 6 sets of divider tabs for use ui/NEDD-218BB 
"Mark 1 Containment Program Load Definition Rept. " 
SOBONiL.vl. General Electric Co. .Nuclear Energu Products Dlv. 
79/01/Oa. Bpp. 



7903030063 DOCKET 30-363 Monticello Nuclear Generating Plant 
Forwards Federal Register notice Issued in response to 
73120B Itr. Advises that office of Nuclear Reactor Regulation 
will handle request for hearing re issuing license amend 
concerning spent fuel storage racks. 
DENTONiH.R. Office of Nuclear Reactor Regulation. 79/01/17. Ip. 



28 



DOCKETED ITEMS 



7902050069 DOCKET 50-243 Monticello Nuclear Generating Plant 
Federal Register notice "Requst tor Iisuance of Immediately 
Effective Drdtr Prohibiting Installation of Allowedly 
Defective Spent Fuel Storage Hacks. " Issued In response to 
7B120B Itr from HU Pollution Control Agency. 
DENTOfJ.H.R. Office of Nuclear Reactor Regulation. 79/01/17, 3pp, 



79D22B03B5 DOCKET 50-363 Monticello Nuclear Generating Plant 
As follouup to NRC 7Q1115 requ*t for submit ta! of Qffsito 
Dose Calculation Manual for approval, forwards guidelines for 
Ijeneral content! of manual. 

GRIMES, B.K Assistant Director for Engineers b Projects. 

79/OI/ia. 5pp. 

7903140197 DOCKET 50-263 Monticello Nuclear Generating Plant 
Rsigonds to 761329 Itr railing question* b Issues re spent 
fuel capacity Increase. Forwards NRC summary responses 
developed for 780609 telephone discu*sion. 
DENTDN.H.R. Office of Nuclear Reactor Regulation. 79/01/26. Bpp. 



7902270394 DOCKET 90-263 Monticello Nuclear Generating Plant 
Effluent b niaste disposal semiannual rept for July-Decj 197fi. 
* Northern States Payer Co. 79/02/31, 13pp. 

7903050202 DOCKET 50-K63 Monticello Nuclear Generating Plant 
Forwards LER 7B-016/03X-M . 
MAYER, L.O. Northern States Power Co. 79/01/29. Ip. 

7 9 020 303 06 DOCKET 30-263 Monticello Nuclear Generating Plant 
LER 7B-016/03X-1 on 780903: during normal operati on. tr ip of 
essential MCC D33A supply breaker 92-304 resulted In 
operation in degraded mode. Caused by low setpoint on trip 
device b bg loss of dash pot oil In trip device. 
SMITH,G.R. Northern States Pouier CD. 79/O1/39. Bpp. 

79O20B01B3 DOCKET 30-263 Monticello Nuclear Generating Plant 
Forwards LER 79-001/O3L-0. 
MAYOR, L.O. Northern States Pooler Co. 79/O2/03. Ip. 



7902220297 DOCKET 50-263 Monticello Nuclear Generating Plant 
Rl i ponds to 790111 request for review of paper "Vent 
Clearing During Simulated LOCA in a Mark I BUR 
Pressure-Suppression Sys. " Recommend! paper be accepted for 
publ ication, 
ORIMES.C. Plant Systems Branch. 79/O1/31, 3pp. 



79020901 B7 DOCKET 50-263 Monticello Nuclear Generating Plant 
LER 79-O01/03L-0 on 7901 10: during normal operation. steam 
leak found in elbow on turbine main ateam bypass header 1 
inch drain line to condenserj due to iroslon caused by steam 
b uiater Ploui of restricting orifice, RO-2369, 
TODIN, P. A. Northern States Power Co. 79/02/02. Ip. 



79080B0195 DOCKET BO-263 Nonticello Nuclear Generating Plant 
Submits Dec 1978 program activity review. comprised of info 
from (elected sections af monthly rept, w/section on contract 
b billing status removed. Lists meeting* held b provides 
tasl-by-task activity summary. 

BOBON.L.J. General Electric Co. .Nuclear Energy Products Div. 
79/02/05. 10pp. 

790212016B DOCKET 30-263 Manticello Nuclear Generating Plant 
Submits startup test rept describing test results t> methods 
uied re installation of fuel nf different dei ign. ini tial 
loading of fuel assemb 1 i eii tore loading pattern Si startup 
test program. 
MAYER. L.O. Northern States Pouier Co, 79/02/07, 3pp. 

79O2130060 DOCKET 50-363 Monticello Nuclear Generating Plant 
Advises of delay of new Tech Specs due to fragmentary nature 
b lateness of guidance re App 1 itds.Eipects to submit 
appropriate license amend request by 790301. assuming 
guidance re offsite dose calculation 1* received. 
MAYER. L, 0. Northern States Poiuer Co. 79/02/09. Ip. 



79O2Q10399 DOCKET 5D-263 Monticello Nuclear Generating Plant 
Forwards IE Insp Rept 50-263/79-19 on 731116-17, No 
noncompl lance noted. 

HEIBHMAN.R.F. Region 3. Chicago, Reactor Construction b 

Engineering Support Branch. 76/12/26. 3pp. 

7902010301 DOCKET 50-263 Monticello Nuclear Generating Plant 
IE Imp Rept SO-263/7EI-19 on 7B1116-17.NO noncompl ianee 
noted. Major areas inspected: IE bulletins b circular fallow up 
relative to nual 1 f Italian of electrical equipment. 
HUGHES, J., SPE5SAHD. R. L. Regions, Chicago, Reactor 

Construction b Engineering Support Branch. 78/12/19. 6pp. 

7902120119 DOCKET 50-263 Mqntlcello Nuclear Generating Plant 
Forwards IE Info Notice 79-01, "Bergon-Paterson Hydraulic 
Shack L Sway Arresters <H5SA>. 
KEPPLER.J.G. Region 3, Chicago, Office of the Director. 79/03/02 



7902210195 DOCKET SO-263 Monticello Nuclear Generating Plant 
Forwards IE Bulletin 79-O1, "Environ Qualification of Class 
IE Equipment." U/llst of 11 systematic evaluation program 
plants for which no action is required. 
KEPPLER.J.G. Region 3. Chicago. Office of the Director. 79/03/09 



7902870339 DOCKET 50-363 Monticello Nuclear Generating Plant 
Forwards IE Info Notice 79-03, "Llmitorque Valve Geared 
Limit Suitch Lubricant. " 

KEPPLER.J.G. Region 3, Chicago, Office of the Director. 79/02/09 

Ip. 

7902130100 DOCKET SO-263 Montiiella Nuclear Generating Plant 
Forwards monthly operating rept far Jan 1979. 
MAYER. L.O. Northern States Power Co. 79/03/09. Ip. 

7902130103 DOCKET 30-263 Monticello Wuclear Generating Plant 
Monthly operating rept for Jan 1979. 
HVRADO.A, L. Northern States Power Co. 79/O2/02. 3pp. 

79082703BB DOCKET 30-263 Monticello Nuclear Generating Plant 
Forwards effluent b waste disposal semiannual rept for 
July-Dec 1978. 
HAVER, L. 0. Northern States Power Co. 79/02/31. Ip. 



7902130175 DOCKET SO-263 Monticello Nuclear Generating Plant 
Forwards LER 79-002/03L-0. 
MAYER, L.O. Northern State* Power Co. 79/03/09. Ip. 

79021301S3 DOCKET 50-263 Monticello Nuclear Generating Plant 
LER 79-OOS/Q3L-0 on 7901 IS: during normal operation, uieeHu. 
average power range monitor functional icram tett was not 
completed within time al lowed. Caused by personnel error. 
EARBON. B. L. Northern States Power Co. 79/OH/09. Ip. 



7902060331 DOCKET 30-265 Quad-Cities Station, Unit 3 
Informs NRC of contract arrangement in/Marsh ft McLennan 
Protection Consultant* to perform various fire protection 
functions. 
NAUGHTON, W. F. Commonwealth Edion Co. 79/01/31. Epp, 



7903200043 DOCKET 30-263 Quad-Cities Station, Unit 2 

Forwards interim security plan for facilities describing 
compensatory measures to be implemented on 79O2B3. Encl 
withheld (ref 10CFH2. 790). 
REED, C, Commonweal th Ediion Co. 79/02/03, Ip. 



79D23B0365 DOCKET 50-263 Ouad-Citiot Station, Unit 3 

Forwards Revision 4 to modified amended security plan for 
Dresden It Quad-Cities & Revision 3 to modified amended 
security plan for lion. Encl withhold (ref 10CFR2. 790). 
LEE,B. Commonuiealth Edison Co. 79/03/30. Ip. 



7901320372 DOCKET 30-265 Quad-Cities Station, Unit 2 

Forwards A6LB 790109 "Huppl Order Ruling on Petition* to 
Intervene" in Oconee-McGuire spent fuel shipment case. 
Supports NRC opposition to Intervention by NRDC b Cltiiens 
for Better Environment. Enc 1 available in Central Files, 
ODDDARD.R.J. Office of the Eiecutive Legal Director. 79/01/13. 

7902060104 DOCKET 30-269 Quad-Cities Station, Unit 2 

NRC response to NRDC b Citizens for a Bettor Environ 7B122B 
statement of . content! ans. Concludes that Contention 9 meets 
requirements. Notice oP appearance b Certificate of Bvc encl. 
GDLDBERO.S.C. Office of thfl Executive Legal Director. 79/O1/12. 
19pp. 

790206013S DOCKET 30-269 Quad-Cities Station. Unit 3 

NRC brief in apposition to admission of certain proposed 

contentions of State of !L re spent fuel storage, Opposes 

admission of' proposed contantions 10 (subparts B, 9, b 10), 

11,I2B,13A b 17. W/CertlFlcate of Svc. 

GODDARD.R.J. Office of the Executive Legal Director. 79/01/1S. 

7pp. 



7902210196 DOCKET 30-368 Quad-Cities S.tation, Unit 3 

Forward* SAND-1927, "Transport of Rad tonuc 1 ides in Urban 

Envlrons:WDrklng Draft Aaes*ment. " AUo forwards 

SECY-7B-311 b 311A, indicating NRC view of rept Impact an 

current regulatory, policy. W/o end. 

OODDARD,R.J. Atomic Safety and Licensing Hoard Panel. 79/01/10 

2pp, 

7902210091 DOCKET 50-265 Quad-Cities Station, Unit 3 

Stipulation of contentions by NRC, State of IL (. util to 
limit issuee amono parties. Reserve rights ra non-stipulated 
contentions. Related correspondence. revised contontiona b 
Certificate of Svc encl. 

GODDARD.R.J. Office of the Executive Legal Director. 79/01/26 
9pp. 



7902220177 DOCKET 30-263 Quad-Cities Station, Unit 2 

Memorandum re State of IL contentions. Withdraws Contentions 
10-12,14,13 ft 17 ft lubmlt* reviled Contention* 3, 10, It II 
Related correspondence, itlpulatlon of contentions, state law 
It Certificate of Bvc end. 
SCOTT, W. J. Illinois, State of, 79/01/26. 33pp. 

790aaa01B2 DOCKET 90-24S Quad-Cities Station, Unit 2 
Notice of appearance of OH Cunningham on behalf of NRC 
Certificate of 8vc encl. 
CUNNINOHAM, 0. H. Hear ings DIvls Ion. 79/03/05. 2pp. 

77022301B6 DOCKET HO-263 Quad-Citlu* Station, Unit 2 
Forwards 1978 Annual Rept for util. 
BRESEMANN. R. W. Commonwealth Edi*on Co. 79/02/15. lp. 

7703330174 DOCKET 30-363 Quad-Cities Station- Unit 2 
1978 Annual Rept. Review* 1978, five year summary of 
operations ft mgt, ft ftnnlcal statement. 
Commonwealth Edison Co. 7B/12/31. 24pp. 

7708810239 DOCKET 30-263 Quad-CltUs Station, Unit 2 

Forward. Endorsement 2 to Binders EO-1, XD-1, EB-2, XD-2, ED-3 
XB-3, EB-27, XB-29, EB-30, XB-30, ED-43, XD-43, ED-43, XB-43. 
evidencing secondary financial protection. 
OBTER.J, Commonwealth Edison Co. 77/02/14. 13pp. 



DOCKETED ITEMS 



7702260333 DOCKET 80-263 Quad-Citie* Station, Unit B 
Forward* info on BUR venting practical. 

DANCE.H.C. HiBion 3, Chicago, Office of the Director 
9pp. 



73/03/07. 



790214021B DOCKET 30-263 Quad-dtie* Station, Unit 2 

Forward! binder* ft uti of divider tabs for use W/NEDO-21BBS 
"Mark t Containment Program Load Definition Rep't. " 
BOBDN.L.J. General Electric Co., Nuclear Energy Products Div 
77/01/08. Bpp, 

79032S03B3 DOCKET 30-243 <luad-Cltlei Station, Unit 2 

At fallouup to NfiC 7B1113 request for submlttal of Offsite 
Do Calculation Manual for approval, forward* guidelines for 
general content* of manual. 

QRIHEBiB.K, . Assistant Director for Engineer* ft Proiects 
77/01/18. 8pp. 

790213002B DOCKET 30-243 Ouad-Citie* Station, Unit 2 

Notification of 770131 meeting In Detheida.Md w/applicant to 

dltciin fir* protection review, 

BEVAN.R. Operating Reactor* B ran ch 3, 79/O1/39. Ip, 

7902580237 DOCKET 30-263 Quad-Cities Station. Unit 2 
Responds to 790111 request for review of paper "Vent 
Clearing During Simulated LOCA In a Hark 1 BUD 
Pre**ure-9uppre**lon Sy. " Recommend* paper be accepted for 
publication. 
QRIMEB.C. Plant Sg items Branch. 77/01/31. Bpp. 

79020B0173 DOCKET 30-263 Quad-Citie* Station, Unit 2 

8ubmlt*-Dec 197B program actlvltg revl nw, compr 1 led of Info 
from lelected lections of monthly rept, w/section on contract 
fc billing statu* removed. Li*t* meeting* held l< provide* 
ta*lt-by-task activity summary. 

BOBDNiL.J. General Electric Co., Nuclear Energy Products Div 
79/03/03. 10pp. 

7902220033 DOCKET 30-263 Quad-Cities Station, Unit 2 

Respond* to NfiC 77O103 request ft forwards Info re projected 
number of ipent fuel aisemblle* to be shipped from Dresden 
to Quad-Cltie*, potilble truck routes ft population along 
route*. Info on rail routing ulll be sent. 
JANECEK.R.F. Commonwealth Edison Co. 79/02/13, 1pp. 

7902260373 DOCKET 30-263 Quad-Citie* Station, Unit 2 

Inform* that response to NRC 7B1203 1 tr it delayed due to 
complexity of que*tion*j info ulll be forwarded by 770415. 
JANECEK.R.F. Commonwealth Edison Co, 79/02/14. Ip. 

7902260270 DOCKET 30-269 Quad-Cities Station, Unit 2 

Submit* request for change to lUunte DPR-29 ft DPR-30, App A 
Tech Spec*. Amend revive* Tech Spec* to conform to 10CFR50, 
App I.U/encl Off*lte Dove Calculation Manual. 
REED,C. Commonwealth EdUon Co. 79/02/16. 3pp. 

7902260273 DOCKET 50-243 Quad-Cltie. Station. Unit a 
Qffsite Da>e Calculation Manual. 
* Commonwealth Edison Co. 77/02/BB. 150pp.. 

79Q3QB002B DOCKET 30-263 Quad-Cities Station- Unit 2 

Ack receipt of 770114 1 tr informing NRC of steps taken to 

correct violations noted In IE ln*p Repts 80-234/78-30 it 

30-363/78-30. 

FIoneLLI.O. Region 3, Chicago, Reactor Operation* Nuclear Support 

Branch. 79/01/30. Ip. 



7902080034 DOCKET 50-243 Quad-Cities Station. Unit 2 

Responds to NRC 781236 itr re violation* noted in IE Insp 
Reptt 50-234/78-30 (. 30-263/7B-30, Corrective action*: 
discusilon tu/personnel stressing need for maintaining close 
control of low power range monitor calibr. 
REED.C. Commonwealth Edison Co. 79/01/16. 3pp. 

7903130034 DOCKET 30-263 Quad-Cities Station, Unit 2 

Forwards IE Info Notice 79-O1, "Bergen-Paterson Hydraulic 
Shoe* ft Sway Arreitors (HBBA)". 

KEPPLER.J.O. Region 3, Chicago, Office of the Director 79/03/02 
4pp. 

7902310220 DOCKET 30-363 Quad-Cities Station, Unit 2 

Forwards IE Bulletin 79-01, "Environ Qualification of Class 

IE Equipment." W/list of 11 systematic evaluation program 

plants for which no action in required. 

KEPPLER.J.O. Region 3, Chicago, Office of the Director. 79/02/09. 



7902370252 DOCKET 30-363 Quad-Cities Station, Unit 2 

Forwards IE Info Notice 79-03, "Limltorque Valve Seared 
Limit Switch Lubricant. " 

KEPPLER.J.O, Region 3, Chicago, Office of the Director 

IP- 



79/02/09. 



790E2B0116 DOCKET SO-26S Quad-Cities Station, Unit 2 
Monthly operating rept for -Jan 1979, 
HANHUM.D. Commonwealth Ediaon Co, 79/02/12, 24pp. 

79020B0314 DOCKET 30-263 Quad-Cltlaa Station, Unit 2 
Forwirds LER 7B-039/03L-0. 
KAUWIANAKISiN. Commonwealth Ediaon Co, 79/01/16. 



Ip. 



7902080232 DOCKET 80-263 Quad-Cities Station. Unit 2 
LER 78-037/03U-0 on 7B1218: test results found HPC! 
initiation switche* associated u/drywell pressure 
instruments not In accordance w/Teth Bpets. Caused bij 
procedural inadenuacyi iwltches excluded from test program 
TIETZ.O. Commonwealth Edison Co. 79/01/16. Spp, 



7902U0143 DOCKET 30-363 Quad-Cities Station. Unit 2 
Forwards LEfi 79-001/O3L-0. 
KAl-IVIflNAKISiN. Commonwealth Edison Co. 79/O1/33 



Ip. 



7902140131 DOCKET 30-263 Quad-Cities Station, Unit 3 

LER 79-001/03L-0 on 790104: during monthly operablllty tent, 

inlet air heater on "A" standby gas treatment sys was found 

inoperable, Caused by setpoint drift of flow switch 

1/3-7341-OA. 

KOOI.M, Commonwealth Edison Co. 79/01/33. 2pp. 

770214016B DOCKET 30-263 Quad-Cltlea Station, Unit 2 
Forwards LER 77-002/O3L-0. 
KAL1VIANAKIS, N. Commonwealth Edison Co. 79/01/36. lp. 

7902140171 DOCKET 50-36B Quad-Cities Station. Unit 2 

LER 77-002/03L-0 on 770t 10: during routine insp of reactor 
mater cleanup pump rooms, small leak was found on H-130SB 
cleanup pump suction line. Cause unknown. Leak was isolated & 
linear Indication on flange ground out. 
SWALES, J. Commonwealth Edison Co. 79/01/26, 2pp. 



7703140474 DOCKET 5O-263 Quad-Cities Station, Unit 2 
Transcript of 790301 prehearing conference held in 
Chicago, IL. re petitions to intervene, Pp 1-90. 

MILHQLLIN, 0, Atomic Safety and Licensing Board Panel 79/03/01 
90pp. 

7703330117 DOCKET 30-366 Point Beach Nuclear Plant. Unit 1 
Inform* that TRADDC Pamphlet 350-30, "IntorsBrvice Procedures 
for Instructional Bys Development" referenced in NUREG-0217 
i* available in microfiche form from NRC. 
BESAU.U.J. Division of Document Control. 79/01/O9. 3pp. 

7902030063 DOCKET 30-266 Point Beach Nuclear Plant, Unit 1 
Agreement between intervenor, WI Electric Power Co ft NRC. 
Intervenor withdraws from spent fuel pool proceeding. Util 
will provide them w/envlron data *emiannually & copies of 
all LERs. NRC ulll Insp pool. 

BABT.S.A. Lakeshore Cltiien* for Safe Energy. CHURCHILL, E. W. 
Wisconsin Electric Power Co. DARTH. C. A, Office of the Executive 
Legal Director. 78/12/13. Spp. 

7902070346 DOCKET BO-246 Point Deech Nuclear Plant, Unit 1 
Forwards Endorsement 36 to NELIA Policy NF-178 ft Endorsement 
47 to MAELU Policy ,MF-33 extending coverage for calendar 
year 1777. 

DUNDAa.M.J. Wisconsin Electric Power Co, 79/03/03. 3pp. 



30 

7902090395 DOCKET 5O-266 Point Beach Nuclear Plant. Unit 1 
Forwards Endorsement 3 to NELIA Cinders EB-1B b EB-19. t, 
Endorsement 3 to MAELU flinders XB-IB t. XB-19 e. tending 
secondary financial protection for gear 1779. 
DUNDASpH. J. Wisconsin Electric Power Co. 79/02/03. 9pp. 



DOCKETED ITEMS 



79020S01B2 DOCKET 50-267 Fort St. Vrain Nuclear Generating, Station 
Requests temporary change in facilitg r. quail Fication 
program- discontinue requal if ication classes during refueling 
shutdoum to increase time for 3th rotation of training from 
tuo to four days. t. schedule eam for 790226. 
MILLEN,C.K. Public Service Co. of Colorado. 79/O1/3O. Zpp. 



7902260333 DOCKET 30-246 Point Beach Nuclear Plant, Unit 1 
Forwards summary of PWR purging & venting eiperiencea, 
SEYFRlT.K.v. Region 4. Dallas. Office of the Director. 74 

4pp. 

7902280339 DOCKET 50-2*6 Point Beach Nuclear Plant, Unit 1 
As folloiiiup to NRC 7B1115 request for submittal of Offsite 
Dose Calculatiort Manual for approval, forwards guidelines for 
general content) of manual. 

GRIMES, fl. K. Assistant Director for Engineers t Projects. 

7^/01/18. Spo. 

7903020259 DOCKET 5Q-2i6 Point Beach Nuclear Plant. Unit 1 
Forwards updates !. revisions to previously submitted info 
re applications for amends to Licenses DPR-24 !< DPR-27. 
Amends eek mod of spent fuel storage k handling facilities. 
DURBTEIN. S. Wisconsin Electric Fouler Co. 79/01/39. 7pp. 

79Q2060304 DOCKET 50-366 Point Beach Nuclear Plant, Unit 1 
Forwards Tech Spec Change Request 54 re acceleration 
spectrum versus frequency, curve for spent fuel pool in 
response to 790126, 6 790129 phone requests. U/encl graph. 
BURSTERS, Wisconsin Electric Power Co. 79/01/30. 2pp. 



7903060323 DOCKET 90-267 Fort St. Vraln Nuclear Generating Station 
Requests NRC issue release to install test fuel elements 
immediately due to March. 1979 refueling schedul e. Submits 
info re modified fuel post-irradiation eaminatlon (PIE) 
program. Util is aware of requirements for PIE. 
FULLER, J K Public Service Co. of Colorado. 79/O1/34, 2pp. 



7902020169 DOCKET 5O-267 Fort 8t. Vrain Nuclear Generating Station 
Notifios NRC that 6 of 37 fuel regions will be replaced. 
Tests shoiu that operation of core for up to 200 effective 
full pouier days is acceptabl e. Revi sad base reactivity curve 
for e. tended cycle mill be Forwarded after refueling. 
FULLER. J. K, Public Service Co. of Colorado. 79/01/23, lp. 

7902010157 DOCKET 5O-267 Fort 8t. Vrain Nuclear Generating Station 
Forwards Amend 3 to fuel test element 8AR. 
FULLER. J.K, Public Service Co. of Colorado. 79/01/26. 3pp. 

7902010160 DOCKET 50-267 Fort St. Vrain Nuclear Generating Station 
Amend 3 to fuel test elB(i.enl SAR which covers effects of 
extended Cycle a core operation on fuel test elements. 
Public Service Co. of Colorado. 79/01/36. 62PP. 



79020-?03flO BUCKET 50-266 Point Beach Nuclear Plant. Unit I 
Submits moil to Tsch Spec Change Request 34 re addl 
restrictions on movement of heavy loads b operation of 
auiiliara blflg crane ovnr spent fuel stored in fuel pool. 
BUR8TEIN.E. Wisconsin Electric Pouier Co. 79/03/07. 9pp. 

790S360101 DOCKET 30-266 Point Beach Nuclear Plant, Unit I 
Forwards IE Insp Hapts 50-266/78-24 I- 50-301/78-33 on 
7B12H-15. No n on compliance noted. 

FIORELLI.O. Region 3, Chicago. Reactor Operations Nuclear Support 

Branch. 79/01/13. 2pp. 

7902260104 DOCKET 50-366 Point Beach Nuclear Plant. Unit i 
IE Insp Repts 30-266/7B-24 t. 30-301V7B-25 on 7B1211-15.No 
noncompllantB noted. Major areas inspec ted: P lant operations, 
cloaniness. review t, aud i t. survei 1 lance testing, nonroutine 
follouiup. IE circular followup. & independent insp. 
CHOULES. N. C. , WARNlCK.fi. F. Region 3, Chicago. Reactor 

Operations Nuclear Support Branch. 79/01/OB, 6pp. 



7902020254 DOCKET 30-267 Fort St. Vraln Nuclear Generating Station 
Proposes Tech Spec change for POX graphite surveillance 
program. Change involves installation of specimens In five 
bottom transition reflector elements of core, then subjecting 

them to nondestructive test. 

MILLEN.C.K. Public Service Co. of Colorado. 79/01/26. 17pp. 

79020100BO DOCKET 50-267 Fort St. Vraln Nuclear Generating Station 
Foruards rept "Fluctuation Events of 7B1104 t< 7B1212i 
Evaluation & Resultant Revisions to Normal tt Test Operating 
Procedures". 
FULLER, J.K. Public Service Co. of Colorado. 79/01/29. 3pp. 

790201009B DOCKET 30-367 Fort St. Vrain Nuclear Generating Station 
"Fluctuation Events of 7B1104 tc 7B1S12, Evaluation & 
Resultant Revlsiona to Normal fc Test Operating Procedures. " 
Describes event resulting from RT-SOO test, compares all 
fluctuation Events & provldas revissd RT-5QO procedure. 
Public Service Co. of Colorado. 79/01/29. IBOpp. 



7902180466 DOCKET 50-266 Point Beach Nuclear Plant, Unit 1 
Ac* receipt of 79O116 Itr informing NRC of steps taken to 
correct violation identified in NRC 701236 Itr. 

KEPPLER, J. G. Reoion 3, Chicago, Office of the Director. 79/01/3O. 

lp. 



790312011O DOCKET 3D-266 Point BBach Nuclear Plant, Unit 1 
Forwards IE Info Notice 79-01, "Dergen-PatBrson Hydraulic 
Shack t, Sway Arrestors (HBSA), 
KEPPLER, J. 0. Region 3, Chicago. DfficE of the Director. 



7902060293 DOCKET 30-267 Fort 8t. Vraln Nuclear Generating Station 
Informs NRC requested info tuas forwarded on 790117. 
FULLER, J. K. Public Service Co. of Colorado. 79/01/29. lp. 

79020B017B DOCKET 5O-367 Fort St. Vrain Nuclear Generating Station 
Responds to Item 7 of 790110 request for addl info rB 
continued reactor operation In nonf luctuating mode, Control 
effected by ordering limiting conditions for operation in 
terms of delta P, core resistance & fluctuations. 
FULLER, J.K. Public Service Co. of Colorado. 79/01/30. 3pp. 



790H12O196 DOCKET 50-266 Point Beach Nuclear Plant, Unit 1 
Responds to NRC 781204 request for addl info re proposed 
Insarvice insp t, testinj} program. Deals u/reactor vessel 
HDiiJa-to-5hell melds, integrally melded supports, interior 
clad surfaces It branch pipe connection Dele's. 
BURSTEIN, E. Wisconsin Electric Power Co. 79/02/O6. 9pp. 

790'2S10204 DOCKET 50-366 Point Beach Nuclear Plant, Unit 1 
Forwards IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment. " H/list of 11 systematic evaluation prOBfam 
plants For uhicli no action is retired. 

KEPPLER, J, Q. Region 3, Chicago, Office of the Director. 

lp. 

7902H70371 DOCKET SO--266 Point Beach Nuclear Plant. Unit i 
Forwards IE Fnfo Notice 79-03. "Limitornue Valve Geared 
Limit Switch Lubricant." 

KEPPLER, J.Q. Region 3. Chicago. Office of the Director. 

IP- 

7902140120 DOCKET 5O-266 Point Beach Nuclear Plant, Unit 1 
Forwards monthly operating rept for Jan 1979, 
aURSTEIN.B. Wisconsin Electric Power Co. 79/02/OB, lp. 

7902140121 DOCKET 50-366 Point Beach Nucloar Plant, Unit 1 
Monthly operating rept for Jan 1979. 
* Wisconsin Electric Pouer Co. 79/03/03. Spp, 



79020B0203 DOCKET 30-267 Fort St. Vraln Nuclear Generating Station 
Forwards general insp plan for inspecting Region 33 during 
upcoming refueling outaoe. Despite 781101 flue tuation. there 
are no plans for addl detailed Insp of regions othor than 
33 Regions 5, 10. 17,21 t, SB mill bo refueled during outaoe. 
FULLER, J, K. Public Service Co. nf Colorado. 77/01/30. 9pp. 

79021301BO DOCKET 30-267 Fort St. Vrain Nuclear Generating Station 
Foruards corrections to Table 3.3.1 of LSBB 3; figure 7. 1. B, 
Mgt Organization Chart d BR 5. 2. E3, PQX Graphite 
Surveillance. _,, ,, 

HAREMBDURG. D. Public Service Co. of Colorado. 77/02/03. Spp. 

7902140093 DOCKET 30-267 Fort St. Vrain Nuclear Generating Station 
Responds to 79O110 request for addl info on H-451 graphite. 
info concerns stress limits, strain behavior, clarification of 
previously submitted data & cesium transport. 
WSSSMAN.G. L. General Atomic Co. (subs, of Oulf Oil Corp.). 
79/02/06. 12pp. 

7903310231 DOCKET 50-267 Fort St. Vrain Nuclear Generating Station 
Foruards Addendum 1 to HTGR preliminary safety evaluation S. 
environ Info document. Describes proposed commercial gas 
turbine plant using helium turblnu pouer conversion SUB, 
safety, licensing & environ considerations. 
TURNER, Ft. F. Gonural Atomic Co. (subs, of Gulf Oil Corp. 
30pp. 



79/02/14. 



7903270293 DOCKET 30-267 Fort 9t, Vrain Nuclear Generating, Station 
Forwards response to NRC 790205 request for addl info re 
H-431 graphite. Eipects NHC to complete review by 790331. 
HES3MAN. G. L. General Atomic Co. (subs, of Gulf Oil Corp.). 
79/02/15. 3pp. 



DOCKETED ITEMS 



31 



7902010303 DOCKET 90-367 Fort St. V.rain Nuclear Generating Station 
Forwards IE Circular 79-02. "Failure of 12O Volt Vital AC 
f>ouar Supplies. " 

BEYFRIT.K.V. Region 4, Dallas, Office of the Director 79/01/16 

7pp.' 

7902060191 DOCKET 30-267 Fort St. Vrain Nuclear Generating Station 
Inservlee tnsp of concrete helium permeability & liner 
corrosion surveillance will be delayed until second 
refueling outage. 
HAREMBOURQ, D. Public Service CD. of Colorado. 79/O1/S6. lp. 

79022B0181 DOCKET 30-267 Fort St. Vrain Nuclear Generating Station 
Forwards IE Info Notice 79-01, "Bergen-Paterson Hydraulic 
Shock t> Sway Arresters <H65A). " 

BEYFRIT.K.V. Region 4, Dallas, Office of the Director 79/02/02 

IP- 



7902090332 DOCKET 30-267 Fort St. Vraln Nuclear Generating Station 
LER 7H-037/03X-1 on 7B12O9:cora average outlet tomp greater 
than 1,200 Fi primary coolant accidents greater than 10.0 
part* per million by vol. Updates rept to correct "D 
ret irculator" to "D recovery compressor." 
GAHM.J.U. Public Service Co. of Colorado. 79/03/Q1. lp. 

7902130142 DOCKET 30-S67 Fort 8t. Vraln Nuclear Generating Station 
Forwards LEH 7B-Q36/03L-1 . 
UAREMBOURG. D. Public Service Co. of Colorado. 79/C-2/OA. lp. 

7902130143 DOCKET SO-S67 Fort St. Vrain Nucloar Generating Station 
LER 7B-Q36/03L-1 on 701129: one engine of tmu driving single 
emergency generator failed to start !< may havo failed to 
declutch from generator. thus rendering generator Inoperabli 
for turn days, No cause identified. 
QAHM, J, W. Public Service Co. of Colorado. 79/02/G6. 3pp. 



7902200009 DOCKET 50-567 Fort St. Vrain Nuclear Generating Station 
Responds to NRC 790113 t> 0122 ltrs requesting Info on 
inservica Imp tc Tech Spec surveillance planned for upcoming 
refueling, outage. Forwards list of surveillances planned. 
Confirms three surveillance which will not he performed, 
FULLER, J. K. Public Service Co. of Colorado. 79/Q2/07. 3pp. 

7902280437 DOCKET 50-H67 Fort St. Vrain Nuclear Generating Station 
Forwards IE Bulletin 79-01. "Environ Qualification of Clan 
IE Equipment." W/list of 11 systematic evaluation program 
planti far which no action IB required. 

8EYFHIT.K.V. Region 4, Dallas. Office of tho Director. 79/O2/OB 

lp. 

79022SQOS4 DOCKET 30-H67 Fort St. Vrain Nuclear Generating Station 
Forward! IE Info Notice 79-03. "Limitorque Valve Geared 
Limit Switch Lubricant." 

BEYFRIT.K. V. Region 4. Dallas. Office of th.e Director. 79/02/09 

IP- 

79021300BB DOCKET 30-267 Fart St. Vrain Nuc lear Generating Station 
Forwards monthly operating rupt for Jan 1979. 
HAREMQOUno, D. Public Service Co. of Colorado. 79/02/07. lp. 



79021300B9 DOCKET 80-267 Fort St. Vrain Nuclear Generating Station 
Monthly operating rept for Jan 1979. 
OAHM.J.W, Public Service Co. of Colorado. 79/02/01. 3pp. 

7902220029 DOCKET 30-267 Fort St. Vraln Nuclear Generating Station 
Forwards monthly operating rept for Jan 1979. 
WAHEMBOURQ, D. Public Service Co. of Colorado. 79/02/09. lp 



7902220042 DOCKET 30-267 Fort St. Vrain Nutloar Generating Station 
Forwards LER 7B-O03/Q3X-2. 
HAREMBOURQ, D. Public Service Co. of Colorado. 79/03/II3. lp. 

7902220047 DOCKET 30-267 Fnrt Bt. Vrain Nuclear Generating Station 
LER 7B-005/03X-2 on 7B121I: malfunctions in Irt; 1C !. ID 
circulator speed measurement, Caused Irian of cii-culntnr high 
speed signals. Caused by loss of high tpocil circulator trip, 
Redundant sys available, 
GAUM, J. W, Public Service Co. of Colorado, 79/02/12. 9pp. 

7902220119 DOCKET 30-269 Oconoo Nuclear Btotion, Unit 1 

Informs that THADOC Pamphlet 330-30, "Intariervicii Procedures 
for Instructional BY 5 Development" referenced in NU(lEO-C-ai9 
it available In microfiche form from NRC. 
DESAW.W.J. Division of Document Control. 79/O1/09. 3pp. 



790220006D DOCKET 50-H6 1 ? Oconoo Nuclear Station, Unit 1 

Forward i modified amended security p Ian, Dovl aion ^.Eiplaln 
chronology of rovi s ( ons. Detat 1 withheld Ivof 10CFRS, 7'JO) . 
PARKER, W, 0. Duke Pouier Co. 79/02/14, lp, 

7903260392 DOCKET 50-269 Oconeo Nuclear Station, Unit 1 

Forwards copies of Itr of Impl eirentat ion fur security plan 

Plan withhold (reP 10CFR2.790). 

PARKER. U. 0, Duke Powor Co. 79/02/21. lp. 

7902260S33 DOCKET 30-269 Dconuo Nuclear Station, Unit 1 
Forwards summary of PWR purging t. venting oiporiuncen 
BEYFRIT.K.V. Region 1, Dallas, Office of the Director 

4pp. 



7902220037 DOCKET 30-267 Fort Bt. Vraln Nuclear Generating Station 
Monthly operating ropt for Jan 1979. 
OAHM.J.W. Public Service Co. of Colorado. 79/02/01. 7pp. 

7902260303 DOCKET 50-267 Fort Bt, Vrain Nuclear Generating Station 
Forwards ninth startup rspt. covering 7BOS22~7B112a. 
WAREMDQURO, D. Public Service Co. of Colorado. 79/02/20. 3pp. 

790H270402 DOCKET 30-267 Fort St. Vroirt Nuclear Generating Station 
Startup Test 9 for period 7BOB22 through 7B1122. Since NRC 
h*t not authorlied op era t ion at pouier levels in me en of 
70X.no further pouier testi worn performed during period. 
Public Service Co. of Colorado. 79/02/20. Hpp. 

7902270337 DOCKET 30-267 Fort St. Vraln Nuclear Generating Station 
Forwards "Semi-Annual Effluent fiept, " for July-Dec 1978 
WAREMBQURO, D, W. Public Service Co. of Colorado. 79/02/21. IP. 

7902270366 DOCKET 3O-267 Fort St. Vrain Nuclear Generating Station 
"Semi-Annual Effluent Hept" for July-Dec . 197B. 
" Public Service Co. of Colorado. 79/02/27. 33pp. 

79022S0367 DOCKET 30-267 Fort Bt. Vrain Nuclear Generating Station 
Forwards. "Ecological Monitoring Progress Rept. Jul-Dec 197B. " 
BHART.F.E. Public Service Co. of Colorado. 79/02/23. lp. 

790BBB0369 DOCKET 50-267 Fort St. Vrain Nuclear Generating Station 
"Ecological Monitoring Frooress Rnpt.Jul 1. 1978-Dec 31, 
197B. " 

GLOVER.F.A.. HOLMES, H. Public Service Co. of Colorado. 78/12/30 
129pp. 



7902090302 DOCKET 30-267 Fort St. Vrain Nuclear Generating Station 
Forwards LER 7B-037/03X-1. 
HAREMBOURO.D. Public Servita Co. of Colorado. 79/OS/01. 4pp. 



790201017B DOCKET 30-269 Oconeo Nucloor Station, Unit 1 

"B&W 177 Fuel Assembly Dinner's Group Asymmetric LQCA Loflds 
Evaluation Program. Phase 2. " Evaluated components includir 
reactor pressure veiaol.fuol asspmblles, control rod drives t, 
core flooding piping, 
* Florida Power Corp, 78/10/10, 9pp. 

7702020200 DOCKET 50-S69 Oconoo Nuclear Elation, Unit I 
Forwards request for relief from A6ME Codo Section IX 
requirements. Asserts performance of hydrostatic tost on 
feedwatei- header, downstream of last liBodcr- Itolotlon valvos 
before steam nonorator, would bn Impractical, U/ilrniuinnu, 
PARKER, H. 0. Duke Power Co, 79/01/26. 3pp, 

790aOB022B DOCKET 30-269 Dctmee Nuclear Station. Unit 1 
Forwards proposed amend to Tech Specs ro increasing spent 
fuel storage capacity in spent fuel pool shared by Units 1 d 

PARKER, W. D. Due Power Co. 79/02/02. i&pp. 

790322003? DOCKET 50-269 Oconoe Nuclear Station, Unit 1 
Responds to NRC 7B1II3 Itr requesting proposed Tech Epecs 
for radiological effluent control fc Offslte Doac CaleuUllon 
Manual. Plans to submit proposals by 790330. 
PARKER, W. 0. Duke Power Co, 79/02/12 lp 



790S1S042B DOCKET 50-269 Oeonee Nuclear Station. Unit 1 
Ack receipt of IE Imp Repts 50-269/70-38,30-270/70-33 I. 
30-2B7/7B-33 on 78121 1-1-1, No proprietary Info. 
PARKER.U.O. Duke Power Co. 79/01/29, Ib. 

7902130431 DOCKET 30-369 Oconeo Nuclear Station, Unit 1 
Foruiaros IE Insp Repts 30-269/7B-3S, 50-370/70-33 t, 
30-297/78-33. No noncomp 1 iance noted. 

LONO.F.J. Region H, Atlanta, Reactor Operations Nuclenr Buo 

Branch. 79/01/10. 2pp. v 



nort 
l 



DOCKETED ITEMS 



7902150437 DOCKET 50-269 Oecnee Nuclear Station. Unit 1 

IE Insp Repts 50-269/78-35,50-270/79-33 t, 30-2137/73-33 an 

791 31 1- 14. Ho noncamp 1 isnie noted. Major areas inspected: 

licensee evant repts, vi stia 1 insp of 5nubbepSihouieBEping 

. cleanliness of reactor hldgs. 

JAPE.F., CROOKS, E.H., QEWTE, R. C. Region 2. Atlanta, Reactor 

Operations Nuclear Support Branch. 79/01/17. 5pp. 

7'9022BCO*2 DOCKET 5O-269 Oconee Nuclear Station, Unit 1 
Ack receipt of IE Inap R&pts 50-269/7B-3B. 50-270/73-36 t, 
90-2B7/7B-38 on 791218-29. No proprietary info. 
PARHEP..W. O. Dulre Power Co. 79/01/29. Ip. 

7902280049 DOCKET 50-269 Qconee Nuclear Station, Unit 1 
Forwards IE Insp Kept* 5O-269/7a-3S, 50-370/79-36 t, 
30-287/7B-3B No nonccmp 1 iant e noted. 

LEWIS, R. C. Region 2. Atlanta, Reactor Operations Nuclear 

Support Branch. 79X01/22. Zpp. 

79O2280Q57 DOCKET 3O-269 Oconee Nuclear Station, Unit 1 

IE Insii Flepts 5O- 269/78-38, 5O-27Q/7B-3b !, 30-2B7/7B-3B on 
7B121B-S9, Wo noncompliance noted. Major area; inspected.: 
plant opera tions, maint & LER f ol louuji , 

JftPE.F. , LEWIS, R. C. Region 3. Atlanta. Reactor Operations 

Nuclear Support Branch. 79/O1/19. 4pp, 

7903260237 DOCKET 50-269 Oconee Nuclear Station, Unit 1 
Foruarda IE Info Notice 79-01, "Bergen-PatBrson Hydraulic 
Snock !. Smay Arrestnrs IHSSAl. ' 

d'flEILLY, J. P. Region 3. Atlanta, Office of the Director 

79/03/02. 3pp. 



7902120326 DOCKET 50-269 Oconee Nuclear Station. Unit 1 

Forwards IE Bulletin 79-01. "Environ Qualification of Class 
IE Equipment. " 

O'REILLY, O. P. Region 3. Atlanta, Office of the Director 

79/02/05. ?pp. 

7902310175 DOCKET 50-269 Oconee Nuclear Station. Uni t 1 

Forwards IE Bulletin 79-01. "Environ Qualification of Class 
IE Equipment. " H/l 1st of 1J systematic evaluation program 
plants for which no action it required. 

O'REILLY, J. P. Region 2, Atlanta. Office of the Director 

79/02/08. 2p-p. 

7902280093 DDCRET 50-269 Oconee Nuclear Station, Unit 1 
Forwards IE Info Notice 79-03, "Limi torque Valve Geared 
Limit Switch Lubricant." 

Q'HEILI-Y, J. P. Region 3. Atlanta. Office of the Director 

79/02/09. 2pj>. 



7902060.166 DOCKET 50-269 Ocone* Nuclear Station, Unit 1 
Forwards LER 79-OO1 /O3H.-0. 
PARKER, M. Q Duke Power Co, 79/Q2/D3 3pp. 

79030601QB DOCKET 30-269 Oconee Nuclear Station, Unit 1 

LEfl 79-Q01/G3L-0 on 7901O2: r-sactor protection =ji Channel C 
Loop A ClDEu transmitter indicated ih i gh. Caused bu. 
malfunctioning amplifier in transml Her. Amp I i f ier replaced. 
LEWIS. 3, R. Duke Power Co 79/02/03. Ip. 



7903060287 DOCKET 5O-369 Oconee Nuclear Station, 
Forwards LER 79-003/03L-Q. 
PARKER, W. 0. Duke Power Co. 79/03/02. Ip 



Unit 1 



7902270394 DOCKET 50- Si 9 Oconee Nuclear Station. 
Forward* LER 79-007/01T-O. 
PARKER. U.O. Out* Pouier Co. 79/03/22. Ip. 



7903270401 DOCKET 30-269 Oconee Nuclear Station, Unit 1 

LER 79-Q07/Q1T-0 on 79Q20B:Unit 2 uias removed from svc for 
maint ti Tech Specs required Unit 1 operabllity to be 
verified every Q-h, which uas not done until 10 minutes patt 
B-h 1 imi t. Caused by personnel failure. 
LEWIS. S. R. Dule Power Co. 79/03/22. 2pp. 



7902220119 DOCKET 50-270 Oconee Nuclear Station, Unit 3 

Informs that TRADOC Pamphlet 330-30, "Interoervico Procedure* 
for Instructional Sys Development" referenced in NUREG-0319 
is available in microfiche form from NRC. 
BEBAM.W.J. Division of Document Control. 79/01/09. 3pp. 



790220006B DOCKET 90-370 Oconeo Nuclear Station, Unit 3 

Forwards modified amended security p Ian, Revi sion 3. Explains 
chronology of revisions. Detai Is withheld (ref 10CFR3, 790). 
PARKER. W. 0. Duke Power Co, 79/02/14. Ip, 

7902260392 DOCKET 50-370 Oconee Nuclear Station, Unit 3 

Forwards copies of Itr of implementation for security plan 

Plan withheld <ref 10CFR2. 790). 

PARKER, U.O. Duka Power Co. 79/02/21, Ip. 

7902360333 DOCKET 30-270 Oconee Nuclear Station, Unit 2 
For-uards summary of PUR purging & venting eiper ionces, 
EEYFRIT.K. V. Kegion 4, Dallas. Office of the Director. 74/09/03, 



790201017B DOCKET 5O-370 Dconee Nuclear Station, Unit 3 

"DkW 177 Fuel Asiembly Owner's Group Asymmetric LOCA Loads 
Evaluation Program, PJiase 1 2. " Evaluated components include: 
reactor pressure vessel, fuel assemb 1 1 es, control rod drives It 
core flooding piping. 
Florida Power Corp. 70/10/10. 9pp. 

79O2030300 DOCKET 50-370 Oconee Nuclear Station, Unit 2 
Forwards request for relief Prom ASME Code Section IX 
requirements. Asserts performance % of hydrostatic test on 
feeduiater head er. downstream of la'st header isolation valvei 
beFore eteam g enerator. would be Imprac tical . W/drauings. 
PARKER. W. 0. Duke Power Co. 79/01/26. 5pp, 

79020B025a DOCKET 90-370 Oconee Nuclear Station, Unit 2 
Forurards proposed amend to Tech Specs re increasing spent 
fuel storage capacity in spent fuel pool sharod bu Units 1 d 
3. 
PARKER, W, 0, Duke Pouior Co. 79/03/02. 65pp. 

79022E0059 DOCKET 30-270 Oconeo Nuclear Station. Unit S 
Respond* to NUC 7B1113 Itr requesting proposed Tech Specs 
for radiological effluent conbrol !i Offsite Dose Calculation 
Manual. Plans to submit proposals by 790330. 
PARKER. W. 0. Duke Pouior Co, 79/02/13, Ip 



7902JS042B DOCKET 50-270 Oconee Nuclear Station, Unit 2 
Act receipt of IE Insp Repts 30-269/70-33,50-370/73-33 tc 
30-2B7/7B-35 on 781211-14. No proprietary info 
PftRKER, W, o. Dufce Power Co, 79/01/29 Ip 



79O3060291 DOCKET 50-3fa9 Dconee Nuclear Station, Unit t 
LER 79-002/03L-0 on 79O 103: hydrnul ic suppressor 
1-01A-1-1-0-4Q1A-H43 uia? discovered to have rotated BO that 
reservoir uias on t ot torn. Func 1 1 anal testing d e<terrained 
suppressor to be Bfierah IB, Cause unknown. 
LEWIS, B, R. Duke Power Co. 79/03/Q2. 3pp 



7903110159 DDCKET EO-369 Ocont 
Forwards LE 79-003/O3L-0 
PARKER. H. 0. Dule Power Co, 



E Nuclear Station. Unit 1 
79/02/OS. Ip. 



7903140164 DOCKET 5O-369 Oconee Nuclear Station, Unit 1 
LER 79-003/03L-0 on 790109: s tatal arm 17O3/15 indicated 
possible fire in reactor hldg but no smoke or fire 
discovered. Cauaed by possible electrical malfunction in one 
of 11 fire detectors in reactor bltfg. 
LEWIS, S, R. Oufce Pouier Co. 79/03/06. 3pp. 



7902270295 DOCKET 50-269 Dcnnee Nuclear Station, 
Forwards LER 79-OQ9/O3L-0. 
PAHKER.U. O. Cuke Pouer Co, 79/O2/21. la. 



Unit 1 



7902270296 DOCKET 5O-369 dconce Nuclear Station, Unit 1 

LER 79-Q05/03L-0 on 790122. control rod drivetlne DC holding 
pouar supply breaker failed to trip during on-line tcata 
Caused by mechanical linkage not operating corr er t ly. Ml nor 
adjustments being made to trip mechanism. 
LEWIS. S, R. Duke Pouaer Co. 79/03/21 3DO 



7902150431 DOCKET 30-270 Oconee Nuclear Station. Unit 2 
Forwards IE Insp Repts 30-269/76-33, 50-270/7B-33 t, 
30-387/73-33. No noraeoirpl lame noted, 

LONO.F. J Region Z, Atlanta, Reactor Operations Nuclear 8tf> 

craned. 77/01/18 3pp. 

7903130437 DOCHET 50-270 Oconee Nuclear Station, Unit 3 

IE Insp Repts 50-269/78-33.50-270/76-33 t. 50-207/78-33 on 

781211-14. Nn noncoinpl iance noted. Major areas inspected: 

licensee, event repts, visual insp of snubbers, housekeeping 

fc cleanliness of reactor bldgs 

JAPE.F , ufiOOK8,E.H.. DEWIS.R.C. Region 2, Atlanta, Reattor 

Operations Nuclear Support Branch. 79/01/17. 5pp, 

79022B0042 DOCKET 30-370 Qconee Nuclear Station, Unit 2 
^' pt f IE In "P Re P t5 SO-369/7B-30, 80-270/78-36 t, 
50-287/78-36 on 79131B-29, No proprietary info 
PARKER, W.O. Duke Power Co. 79/01/29, Ip. 

7902280049 DOCKET 50-270 Oconee Nuclear Station, Unit 2 
Forwards IE Insp Flepts 50-269/76-39,30-270/76-36 !, 
50-397/76-36. No noncompl lance noted. 

LEWIS.R.C, Region 2. Atlanta. Reactor Operations Nuclear 

Support Branch. 79/01/22. 2pp 



DOCKETED ITEMS 



33 



79022BQ057 DOCKET SO-S70 Oconee Nuclear Station. Unit S 

IE Imp Repti 50-2i"?/7e-3B, 50-S70/7B-36 & 50-287/78-38 on 
7B1218-2?. No noncomplianct noted. Major areas inspected: 
plant operations, maint EC LER fallowup. 

JAPE. F, . LEHIB.R.C. Region 2. Atlanta, Reactor Opsratian; 

Nuclear Support Branch. 79/01/19. 1pp. 

79022QOB37 DOCKET 30-27-0 Ocon Nuclear Station. Unit S 
Forwards IE Info Notice 79-O1 , "Berg &n-Paterson Hydraulic 
Shock *. 9uy Ar-restors <H5SA>." 

O'REILLY, J. P. Region 2. Atlanta. Office of the Director. 

79/08/02. 3pp. 



790214021B DOCKET 50-271 Vermont Yankee Nuclear Power Station 
Forwards binders t. sets of divider tabs for use m/NEu[J-2tBBB 
"Mar* t Containment Pronraro Load Definition Rept. " 
SOBDK.L. J. General Electric Co. .Nuclear Energy Products Div. 
9pp. 



79022B03BS DOCKET 5O-27 1 Vermont Yankee Nuclear Pouer Station 
Ai follou-up fco HRC 7B1115 request far util Buhmlttal of 
Off site Dose Calculation Manual for NRC approval . forwards 
guidelines for general contents of manual. 

CRIMES, B.K Assistant Director for Engineers ti Projects. 

79/O1/1B. 3pp. 



7902120226 DOCKET 90-370 Dconee Nuclear Stationi Unit S 

Forwards IE Bulletin 79-01, "Environ Qualification of Class 

IE Equipment. " 

O'REILLY, J. P. Ra*on S. Atlanta. 

79/02/05. 2pp. 



Office of -the Director. 



790B210175 DOCKET 50-270 Otanea Nuclear Station. Unit 2 

Fcruavds IE Bulletin 79-G1, "Environ Quail f leation of Clas* 
IE Equipment." W/lUt of 11 systematic evaluation prooram 
plant* for uhlth no action ii required, 

O'REILLY, J.P. Reg.ion 2. Atlanta. Office of the Director. 

79/03/OB. Spp. 

79022B009B DOCKET 30-S70 Oconee Nuclear Station. Unit 2 
Forwards IE Info Notice 79-O3, "Limitorque Valve Geared 
Limit Suiitch Lubricant. " 

O'REILLV.J.P. ReBion S. Atlanta, Office of the Director. 

79/02/09. Zpp. 



7<?Q2OB0047 DOCKET 5O-27I Vermont Yankee Nuclear Power Station 
Forwards Amend 4"? to License DPR-28, saf o ty evaluation t. 
notice of issuance. 
IPPOI.no, T. A. Operating Reactors Drflni.li 3. 79/O1/19. 3pp. 

7902OBO04Q DOCKET 30-371 Vermont Yankee Nuclear Pouier Station 
Amend 49 to License DPR-2B. c hang I ng Tech Specs fop standby 
ga-B treatment sijs. 
IJ*PDl.ITu,T. A. Operating Reactors Branch 3. 7^/01/19 ipp 

79O2OS0033 DOCKET 50-271 Vermont Yankee Nuclear Power Station 
Safety evaluation sjpportin^ Amend 4"? to DPB-28. Cone lude* no 
environ statement need be prepared. 
* Office of Nuclear R-Eartor Rcflulation. 79/O1/1 1 !. Spp. 



79030B005S DOCKET 5O-271 Vermont Vanliee Nudear Po 
Notice nf issuance of Amend 49 to Litens-e DPR-39. 
IPPDLITO.T, A. Qnrrating Reactors Orancli 3. 



er Station 



7902030121 DOCKET 80-370 Dconea Nucltar Station, Unit S 
Forward* LER 78-O14/03L-0. 
PARKER.W.O. Du*e Power Co. 79/01/30. 2pp. 

7902030124 DOCKET SO-S7O Oconee Nuclar 9tatln-n. Unit 3 

LER 7e-014/O3L-0 on 7B1230; during poiuer escalat ion. coolant 
iyi ItJkagt in ticase of I gpm uiae noted. Lea* resulted from 
packing on pressuriier spray control bypass valve aRC-a. 
Valv* backieattd to halt leahagi. 
LEHIQ.9.R. Duke POIUIBT Co. 79/01/30. lp. 



7902S60477 DOCKET 30-&70 Oconos Nuclflar Station, 
ForiuiriU LER 79-001 /03L-O. 
PARKEft.W.O. Duk Power Co. 77/02/lf. lp. 



7903320257 DOCKET 90-271 Vermont Yankee Nucloar Pouer Station 
ResnandB to 790111 request far ruvieu af paper "Went 
Clearina During Simulated LOCA in a Mark I DHR 
Pressure-Suppress Ion Syt. " Recommends paper be accepted for 
pub 1 i cation. 
GRIMES. C. Plant Systema Branch, 79/01/31. Bpp. 

79020BO193 DOCKET 50-371 Vermont Yankee Nurle-ar Power Station 
Submiln Dec 197B program activltv rev i BUI. cc-mpr i eeii of info 
from srlect&J sections of monthlg rep t, ui/tffctlon an contract 
fc billing status removed. Lints mee'tings held t provides 
tatk -by-task activity -summari;. 

BDBON.L.J. General Electric Co. .Nuclear Energy Products Div. 
79-/O2/O5. lOpp. 



7902260493 DOCKET 30-270 Oconse Nuclear Stationi Unit 2 

LER 79-001/03L-0 on 7901 1U: eng ineerad safeguards Channal C 
roactor bldfl narrow range- pressure trannml ttir out af calibr 
In noneonsarvative direction on three occasions. No cause 
found. Trammitter amplifier replaced. 
LEVJIBiB.fi. Dirks Payer Co. 79/03/19. 3PP. 



790E14O377 DQCHET 50-271 Ver/nont YanVcn Nuclear Poiuer Station 
Forwards supportins. info for OE ItOO series task Si transport 
pBchani-am. RequpBtB NRC concur lu/rept i- permit jsa of cask 1 
lifting dpvito ui/prev I ousl y approveil crane. Submi ts Clans II! 
feo unOr protest of illegality. 
OFIOCE,R.H. Varmont Yankee Nuclear Pouier Corp. 79/02/09. 2pp. 



7902270396 DOCKET 30-270 Oconeo Nuclear Station, Unit S 
Forwards LER 79-Q07/01T-0, 
PARKER. H. 0. Dude Power Co. 79Y02/22, lp. 

7902270401 DOCKET 30-27O Oconee Nuclear Station. Unit 2 

LER 79-007/01T-0 on 7"702oa:Unit 2 was removed from avc for 
maint d Tech apecn require* Unit 1 oporabillty to be 
verified every 8-h,uhich was not done until 1O mirutea past 
B-h limit. Gained by personnel failure. 
LEHIB.9. R. Dukn Pouer- Co. 79/02/H3. 2pp. 

7902220119 DOCKET 30-2-71 Vermont Vankee Nuclear Pouer Station 
Informs tliat TRADOC Pamphlet 350-30, "Interservicir Procedures 
for In*tructional Hijs Developm&nt" referencBd in NURES-0219 
is available in microfiche form from NRC. 
HESAH.H.J. Division of Document Control. 79/01/09. 2pp. 

7902260471 DOCKET 30-271 Vermont Yanhse Nuclear P-DUOT Station 
Forwards staff's review of modified security plan. Notif ies 
utilities of unsatisfactory provision*. Enc lo&ure withhold 
(ref 10CFR2. 790), 
1PPOLITO.T. A. Operating Reactors Branch 3, 79/02/QB. 2pp- 



79O211O279 DOCKET 5Q-271 Vei-mont Yonkeo Muqlear Pouer Station 
"Cask Rigging Analysis 1600 Serial Cask y/ndundant Ears " 
En tra-conaervati ve analysis concludeB caak riggltig is 
nd equate to handle applied load. 
DENNIEOH, D. V,. Vermont Yankee 'Nuclear Power Corp. 79/01/24. 32pp. 

79022ODO14 DOCKET SD-271 Vermont Yankee Nuclear Power Station 
Submits proposed Change 73 to App rt of Licetise HPn-23 ra 
uaste disposal Eija.Alao foruardi draft Off site Dose 
Calculation Manual lor review. 
VANDENnURQH, D. E Vermont Yankee Nuclear Pouier Corp. 79/O2/I3. iSpp 

79O22.1O264 DOCKET 5O-27 1 Vermont Yantec Nuclear Power Station 
Util has leven limit switches inside containment that -do not 
meet environ q,ual 1 f icflt ion cri te^ria, Suitctics are nibher 
Namco Models SL-3CM-71 of SU-3C-I 1 1 . Three provide input to 
reactor protection sijs. 
MOODY, D.E. Vermont Yankee Nuclear Power Corp. 79/02/14. 2pp. 

7902S6O163 DOCKeT 5O-S71 Vermont Yankee- Nuclear Pnucr Station 
Forwards Buppl I to proposed Change 74. Tech Specs App B ro 
water quality limits tr surveillance [-equlrements. 
JOHNSONjW. P. Vermont Yankee Nuclear Pouer Corp 7?/O2/23. 13pp. 



7902210203 DOCKET 30-271 Vermont Yankee Nuclear Power Station 
Forwards revised Pane B(b of mod security plan !< now title 
paoe.Encl withheld (ref 10CFR2. 7901. 
MOODY.D.E. Vermont Yankee Nuclear Power Corif. 79/02/J2. lp. 

7f030<?0219 DOCKET 80-371 Vermont Yankee Nuclear Power Station 
Forwards Endorsement 48 to NELIA Policy NF-189 far calendar 
year 1979. 
CAHEViM.W. Vermont Yankee Nuclear Poiuer Corp. 79/03/06. 2pp. 

7902260343 DOCKET 50-271 Vermont Yankee Nuclear Power Station 
Foru;rii licensees responsofi re BUD purging fc venting. 
BRUNNER.E.J. Reaion 1. Philadelphia, Reactor Operations Nut It 

Support Branch. 76/O5/12. 3pp. 



79Q2O1Q200 DOCKET 90-371 Vermont Yankee Nuclear Ptiuer Station 
Forwards IE Circular 79-O2, "Failure of 120 Vott Vital AC 
Poujer Supplies. " 

ORIER.D.H. Reoian 1, Philadelphia, Office of the Director. 

79/Ol/lti. Bpp. 

790SQEO243 DOCKET 50-271 Vermont Vankoe Nuclear Pouer Station 
Proposes change to Ins&rvlce insp J, test.incofporat.ing Tech 
Spot BUTVBillancc requirements per WflC 760422 rc-queat. 
Changes resolve conflict between preaont Tech Specs, ! ( 197=1 
edition of ASHE Bection XI. 
VANDENQUJI8H, D. Vermont Yankee Nuclear Power Corp. 79/01/30 



37pp. 



34 



7702130033 DOCKET 50-271 Vermont Yankee Nuclear Pouer station 
Forwards IE Info Notice 79-01 , "Her gen-Pa terson Hydraulic 
Shoct !. Suay ArrestQrs (HSSA) " 
79/03)03"' 4 fie9iDn '' Pl "la.tel|ih la , Office of the Director 

7102230507 DOCKET 50-971 Vermont Yankee Nuclear Power Station 
Foruards IE Oulletin 79-01. "Environ Qualification of Class 
IE Equipment " W/list of 11 systematic evaluation program 
plants For uhich no action is required 

79/02/OB H IP RB9I n '' Phl ' adel P'" a - D f flcl! of "e Director. 



DOCKETED ITEMS 



7902200050 DOCKET 50-271 Vermont Yankee Nuclear Pouer Stati 
Forwards monthly operating rept for Jan 1779 
fIDODY, D E. Vermont Yankee Nuclear Pouer Corp. 79/02/IS. 



Ip 



7902200051 DOCKET 50-571 Vermont Yankee Nucleai 
Monthly operating rept for Jan 1979 
SJDSREN.R.M Vermont Y3ni.e B Nuclear Pouer Ci 



Ponrer Station 
rp 79/02/12. 6 pp 



79021301H1 DOCKET 30-271 Vermont Yanke 
Foruards LER 79-00! /O3L-0 
CONWAY, U F. Vermont Vanl.ee Nuclear 



Nuclear Pouer Station 
ouor Corp. 79/02/09. Ip. 



n ~ 37 ' VBrm nt Yar " eB Nuclear P ' f Cation 

79-00 /03L-0 on 79O1 10; during normal operation & routine 
maint.leak uas noted adjacent to flange on reactor water 
cleanup sys suction pip ing. Cauoe unknown 
CONHAY.H.F. Vermont Yankee Nuclear Pouer Corp 79/O2/OB 3pp 



7902370404, DOCKET 5O-27 1 Vermont Yankee Nut 1 
Forwards LER 79-D03/03L-0 
CCNWftY. M. F. Vermont Yankee Nuclear Power Corp 



Pomer Station 

79/02/22. Ip. 



UER90 n= n 

LER 79-003/03L-0 on 790123: main steam safety valve nitrooen 

setpo.nt of 1220 p 6 i fou nd during au rvei 1 lance tet?n H , tn 



5 ; 

,,"",'}, 



Division of Document Control. 79/01/09. 2pp 



> .. J.r,.,. 






* D i a pp UbllC SBrVi " ElBCtr " a * Co. of We(u Jersey. 



? -- 

our c D mp DnBn t 



s-^r-^r; r rt 

foam products 'eplate ejisting 

NIEHI,H.O. EH.I1 Su r ve Hs . 76/02/25. flpp. 



7903230200 DOCKET 3O-272 Salem w,,, i 

"Fire Test on SEHCO PR-BSS BTU c-ff EnEratlna Station, Unit 
Cnncrete Floor. " onicone Foam Sealant in 

^PubUc BervUe Electric fc Gas C . of Ney Jersey . 76/06/as 
7902230201 DDCK6T 50-373 Salem Nuclear Generatin 

rlc !, Qas Co. of New Jersey, 77/05/10. 



7902150040 DOCKET 50-273 Salem Nuclear Operating Station, Unit 'l 
FortLrard. safety evaluation !, E1S re mod of .pent fuel 
storage pool. Copies sent to parties 
SMITH, D, H. Office of the G.ecutive Legal Director. 79/01/19. Ip. 



Safeevauat '^ l^T H ^ ll " T "tlng St.tion, Unit 1 

safety evaluation re mod of spent fuel storage pool, 

Atfdres.es criticalttu cons idoratlon., .pent fm>l tonltna. 

installatioTi of racks 6 fuel hand 1 ino. structural S, 

mechanical desinn I, .tu. Cone ludos mods acceptable. 

* OPfics of Nuclear Reactor Regulation. 79/O1/13. aOpp. 

79021S0052 DOCKET 50-273 BaUm Nuclear Generating Station, Unit 1 
EI9re mod of spent fuel storage pool to Iner.'.t cpit 
hl f B r? d r f- r BB "P"'*u-l reproces.inS 
D ur f^'K "" C . oollri ? "* radioactive Mit*.po l 
* Offi r 1 S"',* 1 en X iron B ff"".EIS not nec tt ,.ary. P 

Office of Nucloar Reactor Regulation. 79/01/19. i29pp, 



, . E>1I11 ,, V . L .,., , 7 ,, 01/a , p 



j. Conner, Moore t, Corb.r. 79/01/24. 3pp. 

7902030059 DOCKET 50-372 Salem Nuclear Oener-tinfl Station, Unit 1 
Protective order re confidential matl from Public Svc 
Electric (, flan Co to Public Advocato of NJ and MHB 
M?| C Hni'| C ,i ^ s , SOlflte! ' Inc.W/encl Form oF uixtei-UX Ing. 
7pp Safety and Licensing Board Panel. 77/01/85. 



?? CKET 5 ?" a73 Sal ' m N "' l<laT """-"ting Station, Unit 1 
llconiee's objectionG to intervenors' 



SMITH. ..H. 



2? S 

21 b 



Qpp 



thay could not lead to the discovery of 

O. U. Atomic Safety and Licenting Board Panel! 77/01/29, 



7902220225 DOCKET 30-272 Salem Nuclear Oentr.ting Station. Unit 1 
Foruaro, constituent H Roth Itr for inclusion n record re 
NHC^rept on plant ln B p.Roth is auafting NRC inspector'. 

ROTH.W. U. Senate, 79/01/29. 3pp. 



M1LHOLLI N , .L. Atomic Safety and Licensing Board P.n.,. 79/01/31. 



re 
DAVIS, J.O. Office of Inspection & Enforcement. 79/02/03. Ip. 



^ Station, unit , 

is comp lete, parUcularlu !^! B *' ! " ltlt " 1 " 't 



Delaware 8 afe Energy CoalUion. /,. ipp , 



npsrating I i cense 'proceed ing w/rSa.on"*****? BU * P * nii 

of Inspaction & Enforcement. 79/03/05. Ip. 
7903260369 DOCKET 90-372 Salem Nuclea 

-^KaL^-l'iEs ;:::^r"- : P^:^x;L " ' 



lopn 



DOCKETED ITEMS 



35 



7903860978 DOCKET 3O-272 Salam Nuclear Generating Station. Unit 1 
"Addendum to Individual Bite Ratings from the IE Employee 
Survey on Evaluation of Licensees, Apr 7S. " 
Office of Inspection t. Enforcement. 7B/04/3O. 45pp, 

79QB2S0403 DOCKET 30-272 Salem Nuclear Generating Station. Unit 1 
Forwards 780721 testimony of J Qofmon as limited appearance 
statement. Author unable to attend 790233 hearing. 
LEWIS, M, I. Affiliation Unknown. 79/02/06 3pp. 

7902320313 DOCKET 30-272 Balam Nuclear Generating Station, Unit 1 
Notifies of typographical error in 79O129 order on Page 7, 
line 111 "K eff Cells" should read "K eft." 

MILHOLLIN. 0. L, Atomic Safety and Licensing Board Panel. 79/03/09 
IP- 



79Q203036B DOCKET 50-272 B 
Forwards Dec 1970 operat 
treatment plant. 
MIDURA.H. J. Public Serv 
79/O1/O5. 3pp 



n Nuclear Generating Station, Unit 1 
rept for industrial ujaste 



ice Electric tt Gas CD. of New Jersey. 



7902140203 DOCKET 50-272 Salem Nuclear Generating Statinn, Unit 1 
Forwards "Impingement Monitoring Program Rapt 21 Dec 197B " 
LIDBIZZIiP. P. Public Service Electric !< Gas Co. of New Jersey. 
79/01/19. Ip. 



7902140206 DOCKET 5O-372 Salem Nuclear Generating Station. Unit 1 
"Impingement Monitoring Program Rept 21, Dec 197B, " 
Public Service Electric t. Gas Co. of NOLI Jarseij. 79/01/19 
64pp. 



7902210260 DOCKET 30-272 Salem Nuclear Generating Station, Unit 1 
Forward* Endorsement 31 for Policy NF-330 S. Endorsement 25 & 
Si fop Policy HF-9Q fop calendar year 1979, 
CORREA, C. Marsh ( McLennan, Inc. 79/02/14. 4pp. 

7902230163 DOCKET SO-27S Balam Nuclear OenHrating Station, Unit 1 
Forward i Endorsement E to ANI Binder EB-6O, providing 
secondary financial protection for calendar year 1979, 
CDRREA, C. Mapih tt McLennan. Inc. 79/02/16. 3pp. 

7702230171 DOCKET 50-273 Balem Nuclear Generating Station, Unit I 
Forward* Endorsement 32 to ANI Pollcg NF-230 for calendar 
year 1979. 
CORREA, C. Marih tt McLennan, Inc. 77/02/16. 2pp. 

79022 B 03 SB DOCKET 30-S72 Salem Nuclear Generating Station, Unit 1 
Ai followup to NRC 761115 request for submittal of Offslte 
Doie Calculation Manual fop approval, forwards guidelines for 
general contents of manual. 

ORIMESiB. K. Assistant Director for Engineers (.Projects. 

79/01/1B. Spp. 

7902090366 DOCKET 30-272 Salem Nuclear Generating Station. Unit 1 
.Notice of 790203 meeting in/Public Svc Electric & Qa Co to 
dlicuis proposed Tech Spec changes re moderator temp 
coefficient tt rod position Indication requirements. 
ZECHiO, 0. Operating Reactors Branch 1. '79/01/29. Hpp. 

79QS04.026B DOCKET 30-3713 SB Urn Nuc 1 Bar Generating Station, Unit 1 
Respond* to NRC 791126 Itr re containment purfling during 
normal plant operation. Contends that design of purge & 
pretiupe relief valves >pe In full compliance tt design Is 
not subject to override conditions to prevent valve closing 
LIBRIZZI, F, P. Public Service Electric t< Oas CD. of Neui Jar-sou. 
79/01/30. Spp. 

7902220092 DOCKET 80-272 Salem Nuclear Generating Station, Unit 1 
Forwapd* results of revaluation of ECCS cooling performance 
calculated in accordance u/Fob 197B version of Uestlnahouse 
evaluation model, 

LIBRIZZI, F. P. Public Service Electric ft Gas Co. of New JBPSBU. 
79/02/13. 63pp. * 



79Q22.2QQ2B DOCKET 90-272 Salem Nuclear Generating Station, Unit 1 
flequeits propaved change to License DPR-70 re safety Tech 
Bptcs tApp A) Involving section on containment structural 
Inteoritg. H/pemittance of f 1,200 for Clan II amend. 
LIBRIZZI, F. P. Public Service Electric & Qas Co. of How Jersey. 
79/02/16, Bpp. 



7902030364 DDCKET 30-372 Salem Nuclear Generating Station, Unit 1 
Forwards Dec 197B discharging monitoring rep ts. Mat] 
collected on travelling screens was deposited at Quintan 
landfill. 

MIDURA,H.J. Public Service Electric 6 Oac Co of Netu Jeraeg 
79/01/25. 14pp. 

79022QOO5B DOCKET 30-273 Salem Nuclear Generating Station, Unit 1 
Forwards monthly operating rept for Jan 1979, 

HIDUfiAiH.J. Public Service Electric !i Oas Cn. of Now JBTHCIJ 
79/02/09. Ip. 

7902200039 DOCKET 30-372 Salem Nuclear Generating Station, Unit 1 
Monthly operating rept for Jan 1979. 

MILLER, U.K. Publit Service Electric Sr Gas Co. pf New Jersey 
79/03/09. IBpp. 

79020B0226 DDCKET 30-272 Balem Nuclear Oonerating Station, Unit 1 
RO 79-11/OIP on 7901I6:radiatlon monitoring channel 1H11A 
alarmed u/o Indicating containment ventilation isolation. 
Grab samples of containment atmosphere uere taken. 
MIDUflA.H.J. Public ServiEe Electric t Gas Co. of Neui Jerseii 
79/01/16. Ip. 

7902030174 DDCKET 50-272 Salem Nuclear Qeneratino Station. Unit 1 
Foruiapds ECCB actuation rept for FID 79-74/990, 

LIBRIZZI, F. P. Public Service Electric & Das Co. of Neu Jersey 
79/01/26. Ip. 

7903030177 DDCKET 30-272 Salem Nuclear Oenerattno Station. Unit 1 
RD 7B-74/990 on 781127: ID vital instrument bus inverter 
failed, causing a reactor trip, activation of all Channal II 
protection inputs to the solid state protection igs, t 
multiple equipment failure. 

KLoaouiCZ.P. C. Public Service Electric f. Gas Co. nt NBU Jersey, 
79/01/26, 4pp. 



7902020213 DOCKET 30-27B Salem Nuclear Generating Station, Unit I 
Forwards LER 79-01 1 /OIT-0, 
LIuRIZZI,F.P. Public Service Electric 
79/01/30. 3pp. 



Oai Co. of Neuj Jerseu 



790203021S DOCKET 50-272 Salem Nuclear Generating Station, Unit 1 
LE[i 79-011/01T-0 on 7901 16: rad latlon monitoring channal 
1R11A alarmed bi/o initiating containment ventilation 
isolation. Due to failure of control room operators to reset 
channal before resetting containment ventilation Isolation. 
KAPPLE,A,W. Public Service Electric tt Oas Co, op Neu Jerscu 
79/01/30. Ip. 



790BO10274 DOCKET SO-E7B Salem Nuclear Genera ting Station. Unit 1 
Forward* IE Circular 79-03, "Fallupn of 120 Volt Vital AC 
Power Supplies. " 

CRIER, B. H. Region 1, Philadelphia. Office of the Director. 

79/01/16. Bpp. 

7908130003 DOCKET 30-272 Salem Nuclear Oanarating Station, Unit 1 
Forwardi IE Info Notice 79-01, "DErBn-P*tHpson Hydraulic 
Shock tt Sway Arrettors (H9BA). " 

CRIER, B.H. Region I, Philadelphia, Office of the Director. 

79/02/03. Spp. 



7902020197 DOCKET 30-273 Salem Nuclear Generating Station, Unit I 
Forwards LER 79-OOo/03L-0. 

LIBRIZZI, P.P. Public Service Electric ti Oas Co. of NBU Jersey. 
79/01/31. 3pp. 

7902020202 DOCKET 30-272 Salam Nuclear Generating Station, Unit 1 
LER 79-Q06/03L-O on 790102: inservice insp data packages not 
beino reviewed. Cause was lack of administrative control to 
correlate responsibilities of tuo station dopts. Dept review 
procsdurss have been rewritten. 

KAPPLE.A.W. Public Service Electric tt Das Co. of Neui Jersey 
79/01/31. Ip. * 



79022SOSOO DOCKET 50-272 Salem Nuclear Generating Station, Unit 1 
Forwardi IE Bulletin 79-01. "Environ Qualification of Cla* 
IE E<Hjtpfnnt. " W/liit of 11 sustematlc evaluation program 
plants for which no action is required. 

ORIER, B. H- Region 1, Philadelphia, Office of the Director, 

79/OB/OB. IP. 



7902020260 DOCKET 30-272 Salem Nuclear Generating Station, Unit 1 
Forward! Dec 1978 uastewato-r irsatmint rapt. 

HIDURA,H. J. Public Service Electric tt Oas Co. of Neut Jepieu. 
79/01/03. Spp. 



7703030213 DOCKET 50-272 Balem Nuclear Generating Station, Unit 1 
Forwards LER 79-013/04L. 

LIBRIZZI, F. P, Public Service Electric d Oas Co. of Neui Jersey 
79/01/31. Ip. 

7902020221 DOCKET 30-272 Salom Nuclear Generating Station, Unit I 
LER 79-013/04L on 790102: non-radioactive waste effluent 
total suspended solids eiceeded Tech Specs. Caused bv 
abnormally high number of demineraliied regenerations 
supporting initial flushes for startup preparation. 
KAPPLE.A.W. Public Service Electric t, Oas Co, of New Jersey 
79/01/31, Ip. 



3B 

79O3050196. DOCKET 50-272 Sdlen 
Forwards. L6R 79-Q03/03L-0 
LlDHIJZIiF.P. Public Servie 
79/01/31 3pp 



DOCKETED ITEMS 



Muclear Generating Station. Unit 1 
Elctnc J, Gas Co of Neu Jersey. 



7-90E050197 DOCKET 50-273 Salem Nuclear Generating Station, Unit 1 
LER 79-003/O3L-0 on 7901O3. containment pressure eiceeded 
Tech Spec mai. Caused by isolation of pressure/vacuum relief 
system For rework of ICVb. 

KAPPLE, A. W. Publit Service Electric !. Gas Cn. of Neu Jerseg. 
79/01/31. Ip. 

7902050196 DOCKET 50-272 Salem Nuclear Generating Station. Unit 1 
Forwards LER 79-002 /03L-0. 

LIBRlZZIi F. P, Public Service Electric & Oas CD. of Neu Jersey. 
77/01/31. 2pp. 

7902030201 DOCKET 50-372 Salem Nuclear Generating Station- Unit 1 

LER 79-002/03L-0 on 790103: eicessive leak rate In Wl 100 air 

lack noted Door; were remarked & airlock returned to 

operation. Seals failed due to split at vulcaniicd seam. 
Door seals were replaced. 

KAPPLE.A.W. Public Service Electric t. Gas Co. of Neu Jersey. 
79/01/31. Ip. 



7903270293 DOCKET 50-27S Salem Nuclear Generating Station, Unit 1 
LER 79-007/Q3L-0 on 790126: uh 1 1 e performing channel check of 
pressurirer 1 evel. Channel II found S5t lower than others;. 
Caused by instrument drift resulting in iero shift in 
transmitter output. 
KAPPLE, A.M. Public Servici 
79/02/23. 3pp, 



Electric Sc Oas Co. of Neui Jersey, 



7903360620 DOCKET 50-375 Diablo Cangon Nuclear Power Plant, Unit 1 
Responds to 7B072S 1 tr requesting addl info re main steam 
line break analgs is. Discusses containment temp in/respect to 
time. sample collection of instrument thermal response to 
containment & qualification temps for equipment. 
CRANE.P-A. Baltimore Os b Electric Co. 7B/12/1B. 9pp. 

7902080237 DOCKET 30-275 Diablo Canyon Nuclear Power Plant, Unit 1 
Forwards copies of Amends 75 & 76 to liconsB application. 
U/encl Certificate of Eve. 
CRANE,P.A. Pacific Oas t, Electric Co. 79/03/03. 3pp. 

7902080241 DOCKET 3Q-27S Diablo Cangon Nuclear Power Planti Unit 1 
Amends 73 t. 76 to license app 1 ication. Includes fnatl for 
Chapters 4, 4A & 10 of Hosgri Seismic Evaluation. 
Pacific Gas it Electric Co. 79/08/03. 125pp. 



7902060190 DOCKET 50-272 Salem Nuclear Generating Station, Unit 1 
Foriuarrfs LEf) 79-003/03L-0 u/ support ing documentation. 
LIBRIZZ1.F, P. Public Service Electric & Gas Co. of Neu Jersey. 
79/01/31. 3pp. 

79Q206Q194 DOCKET 50-372 Salem Nuclear Generating Station, Unit 1 
LER 79-003/03L-0 on 790104: during normal operations, position 
indication for Rod 2DS began osc i 1 lating. Rod position within 
12 steps of bank D. Caused traced to rod indication coil 
stack on reac tor. Repairs planned for neit reactor outage. 
KAPPLE. A. U. Public Service Electric & Gas Co. at New Jersey, 
79/01/31. Ip, 

79O2I20I1B DOCKET 50-273 Salem Nuclear Generating Station. Unit 1 
Forwards LER 79-OOB/O3L-0. 

LIBRIZZI, F. P. Public Service Electric t Oas Co. of New Jersey. 
79/02/O7. Ip. 

790S12O133 DOCKET 50-373 Salem Nuclear Generating Station, Unit 1 
LER 7t-QQB/03L-Q on 7901 1 1: during normal operation uhile 
refilling boric acifl storage tanks, operator added improper 
batch of acid to tanks & pumped concentrates tank to storage 
tanks. Caused by personnel error. 

KAPPLE, A. W. Public Service Electric b Oas Co. of New Jersey. 
79/02/07. 3pp. 



7902120122 DOCKET 50-272 Salem Nuclear Generating Station, Unit 1 
Forward B tER 79-O09/03L-0. 

LIBRIZZJ, F". P. Public Service Electric & Gas Co. of Neu Jerseg. 
79/03/07. Ip, 

7902120126 DOCKET 50-372 Salem Nuclear Generating Station, Unit 1 
LER 7 C J-OO9/031--O an 770112: No 13 auxiliary bldg exhaust fan 
removed from ivc to replace motor. Caused by worn fceywatj in 
drive motor shaft. 

KAPPLE' ft. W. Public Service Electric i< Gas CD, of Neu Jersey. 
79/02/O7. 3pp. 

790E20003B DOCKET 50-373 Salem Nuclear Generating Station. Unit 1 
Forwards LER 79-012/03L-0. 

HERIZZInF. P. Public Service Electric I, Oas Co. of New Jersey, 
79/02/13. Ip. 

7903200039 DOCKET 50-372 Salem Nuclear Generating Station, Unit 1 
LER 79-0-12/Q3L-0 on 7901 IS. No 11 steam generator steam Flow 
channel II failed low. No cause found. Operator took manual 
control It re-established steam generator level. Channel 
Indication normaliied within 10 minutes. 

KAPPLE, A, W, Public Service Electric & Oas Co. of Neui Jersey. 
79/02/13. 3pp. 

7902330117 DOCKET SO-272 Salem Nucliar Generating Station. Unit 1 
Forwards RO 79-1OY04L. 

LIHRIZZI.F. P. Public Service Electric & Gas Co. at New Jersey. 
79/02/1A. Ip. 

7902230156 DOCKET 50-272 Salem Nuclear Generating Station, Unit 1 
RQ 79-10/OHL on 7901 IB: condenser mat delta limit of B7. 3 F 
bias exceeded at 2000 &r 2100-h. Caused by extremely lou tide 
u/high minds & lou temp causing icing problems w/circulating 
uater screens. 

KAPPLEiA.M. Public Service Electric & Das Co. of Neui Jersey. 
2pp. 



7902370291 DOCKET SO-272 Salem Nuclear Generating Station, Unit 1 
Forward B LER 79-007 /03L-0. 

LlBRIZZIiF. P. Public Service Electric & Gal Co. at Neui Jersey. 
79/02/23. Ip. 



790203020B DOCKET 30-273 Diablo Canyon Nuclear Poiuer Plant. Unit 1 
Forwards description of fireproofing for electrical conduits 
based on comparative test resul ts. Del ieves resulting 
configuration meets & eiceeds NC fireproofing requirement. 
Conduit fireproof ing is being installed. 
CRANE. P. A. Pacific Gas b Electric Co. 79/O2/02. 1pp. 

7902060201 DOCKET 30-273 Diablo Canyon Nuclear Power Planti Unit 1 
Supplements joint intervenors 7B1231 request to ASLAB to 
certify question of issuance of subpoenas to M Trifunac & 
E Luco. Requests readmittanco of ABLB ' s elhlbit No B. A-J. 
Certificate of Svc encl. 

FLEISCHAKER, D, B Center fnr Laui in the Public Interest. 79/01/11. 
IIPP- 



79020BOE93 DOCKET 50-573 Diablo Canyon Nuclear Power Planti Unit 1 
Responds to 79O105 Itr. Explains that neither 7B1201 Itr nor 
encl were received by NRC.VJill respond to them If received. 
CQMBSiT.R. Correspondence. & Records Branch. 79/01/19. Ip. 

79020B029& DOCKET 30-275 Diablo Canyon Nuclear Power Plant, Unit 1 
Cites statemant contained in 790103 Itr from author to 
President 4B indicative af CA Public Utll Commission ' 
Inability to identify calculations establishing structural 
stability under earthquake conditions. 
CALBOVAS, C. D. Affiliation Unknauin. 79/01 /OS. Ip. 

7901230019 DOCKET 30-275 Diablo Canyon Nuclear Pouer Plant. Unit 1 
Forwards NUREG/CR-0400. "Risk Asieeiment Review Group Rept to 
the US NRC (Lewis Hept) , provid ing recommendations for use of 
risk assessment methodology d assessment of WASH-1400. W/o 
enc 1. 
DAVIB.L.D. Office of the Executive Legal Director. 79/01/13. Ip. 

7902010375 DOCKET 30-273 Diablo Canyon Nuclear Power Plant, Unit 1 
Objects to plant licensing since danger is not worth the 
risk. 
MURRAY, E. Affiliation Unknown. 79/01/13. Ip. 

7902010377 DOCKET 80-273 Diablo Canyon Nuclear Power Plant, Unit 1 
Objects to use of nuclear energy before safe d adequate 
provision i's made for radwaste di spoaal. Asks discontinuation 
of const due to praiimltg of an "earthquake fault." 
BACHELB, I. 0. Affiliation Unknown. 79/O1/19. Ip. 

7902210039 DOCKET 8O-275 Diablo Canyon Nuclear Power Plant, Unit 1 
Respond B to 790104 order to show cause fc request for 
directed certification. Request* ASLD find that intervanari 
have filled to establish requisite exceptional 
circumstances. Certificate of Svc. d transcript encl. 

OEKO.A.C., Snill & Wilmer, HQRR188EY, J. C. , CRANE, P. A. Pacific Cas l< 
Electric Co. 79/01/17. 13pp. 

7902030055 DOCKET 30-279 Diablo Canyon Nuclear Pouer Plant, Unit 1 
NRC motion to waive 10CFR2. 762(c ) d response to intervenors 
San Luis Oblspo Mothers for Peace 781231 petition for 
illrected certification ti suppl dtd 79011 1. Concludes petition 
should be denied. Certificate of Svc encl. 

STAENBERO, M. R. Office of the Executive Legal Director. 79/01/1B. 
22pp. 



7902H040H DOCKET 30-373 Diablo Canyon Nutlaar Power Plant, Unit 1 
ACRS motion to file brief amicus curlae re subpoena of Drs 
Trifunac b Luco. Office of General Counsel attorneys who 
participated in Interpretation of IOCFR2. 720<h) mill not 
represent ACRS. 
SHIELDS, W, M. Office of the General Counsel. 79/01/1B. Ip. 



DOCKETED ITEMS 



37 



7902140412 DOCKET 90-279 Diablo Gang on Nuclear Power Plant. Unit 1 
AC HO brief amlcus curia* r ABLE ruling denying requested 
subpoenas of ACR8 consultants. Believes difference in views 
u/conlul tants not an ISBUO fc agrees iii/Board's decision. 
BHIELDS.H.M. Office af the General Counsel. 79/01/18. 4pp. 



7903120127 DOCKET 30-273 Diablo Canyon Nuclear Power Plant, Unit 1 
Forwards IE Info Notice 79-01 , "Bergfin-PaternDn Hydraulic 
Shock & Smay Arresters (H55A). 

ENGELKEN.fi. H. Region 3. San Francisco, Office of the Director. 

79/03/02. Ip. 



79022B0110 DOCKET 3O-27S Diablo Canyon Nuclear Power Plant, I 
Letter of concern re facility & nuclear industry in 
general, written by Individual serving sentence in San Lull 
Oblspo County jail for trespassing on util property on 
7BOB06. Requests NRC attention to dangers of facility. 
VAflNER, A. Affiliation Unknown, 79/01 /IB, 3pp. 



7902260583 DOCKET 50-273 Diablo Canypn Nuclear Poiuer Plant, Unit 1 
AcV receipt of 781103 !< 790118 Itrs informing NRC af steps 
taken to correct violations noted in IE Inap Rept 
30-273/7B-12 t 30-323/78-12. 

SPENCER, 0, S. Region 3, San Francisco, Reactor Construction 6 

Engineering Support Branch. 79/O2/05. Ip. 



79023B0112 DOCKET 90-279 Diablo Canyon Nuclear Power Plant, Unit 1 
Expresses opposition to granting facility const permit. 
RICHMAN, E. Affiliation Unknown. 77/01/11, Ip. 

7902280117 DOCKET 90-273 Diablo Canyon Nuclear Pouier Plant, Unit 1 
Expresses opposition to all nuclear pouier plants until 
adequate uiaste disposal ays Is found. Espec ial ly opposed to 
plants located along earthquake fault lines. 
KOOBED. 0. Affiliation Unknown. 79/01/17. Ip. 

79022BQI23 DOCKET 50-279 Diablo Canyon Nuclear Pouier Plant, Unit 1 
Expressas opposition to nuclear power for safety reasons. 
Requests denial of facility const permit. 
FREVEfi, A. Affiliation Unknouin. 79/02/03. Ip. 

7902390084 DOCKET 50-275 Diablo Canyon Nuclear Powir Plant, Unit 1 
Intervenor San Luis Obiipo Mathers for Peace response 
Informing af Inability to participate in hearing, due to 
denial of qualification of eipert witnesses & denial af 
acceift to security plan. Certificate of 8vc encl. 
VALENTINE. P. C. , JONES, V.I. Ban Luis Obiipo Mothers for Peace. 
79/O1/19. 6pp. 

7? 020 103 9 B DOCKET 30-279 Diablo Canyon Nuclear Power- Plant, Unit 1 
Explains that limited appearances uiare held on 781504-05. 
Although no addl oral statements will be heard, mill we 1 corns 
lubnittal of uritten statement. 
BOWERB.E.B. Atomic Safety and Licensing Board Panel. 79/01/23. Ip. 

7902010403 DOCKET 90-279 Diablo Canyon Nuclear Pouier Plant, Unit 1 
Requests permission to make a limited appearance at hearings 
on 790206, 
BALDWIN. M. A. Friends of the Earth. 79/01/10, Ip. 

7903280811 DOCKET SO-B79 Diablo Canyon Nuclear Poiuar Plant, Unit 1 
Memorandum fc ordar granting petition for directed 
certification! reverses A8LB rulings denying subpoenas for 
Drs Trifunac tt Luco. Instructs Board to issue subpoenas b 
remands cause for further action. 

DUFLO.H, E. Atomic Safety and Licensing Appeal Panel. 79/01/23. 
llpp. 

790806004S DOCKET 90-379 Diablo Canyon Nuclear Power Plant. Unit 1 
Not if las that NRC will not review ALAB-5141 death of 
intervnors's ultness rendered moot question of his 
qualification* far access to facility* security plan. 
CHILK'B.J. Office of the Secretary of the Commission. 79/01/36. 



7902090011 DOCKET 90-E7S Diablo Canyon Nuclear Pouir Plant, Unit 1 
Respond* to 7H1122 Itr inquiring who inspects structural 
iteel at facility. NRC has overall' responsibility t, licensee 
has secondary responsibility to Insp structure h to 
stablish a QA program. 

OOBSICK.L, V. Office of the Executive Director for Operations. 
79/01/33. 4pp. 

7903370399 DOCKET 90-379 Diablo Canyon Nuclear Power Plant, Unit 1 
Forwards Endorsement 50 to NELIA Policy NF-22B, 
CRANE.P.A. Pacific Oas t, Electric Co. 79/02/22. 2pp. 

7903230130 DOCKET 80-273 Diablo Canyon Nuclear Power Plant, Unit 1 
If NRC finds testing method for environ qualification of fan 
cooler pouir cable unacceptable, PQt<E will propose sequential 
testing to qualify cable. 
CRANE.P.A. Pacific Qa* (.Electric Co. 79/02/19. Ip. 



7902010330 DOCKET 50-273 Diablo Canyon Nuclear Power Plant, Unit 1 
Forwards IE Insp Repts 90-379/7Q-30 fc 30-323/73-10 on 
781206-09, No noncomp 1 lance noted. 

CREWS, J,L. Region 9i San Francisco. Reactor Operation! Nuclear 

Support Branch. 78/12/29. Epp.' 

7902010337 DOCKET 90-379 Diablo Canyon Nuclear Power Plant, Unit 1 
IE Imp Repts. 50-27S/7B-20 fc 50-323/7B-1B on 7B1S06-OB. No 
noncompllance noted, Major areas inspected: preoperational 
test procedures b evaluation h verification of test results. 
MORRILL, P. J. i flTERNBERO, D. M. Region 5. San Francisco, Raactor 

Operations Nuclear Support Branch. 7B/12/2B. Kpp. 



7903360610 DOCKET 30-275 Diablo Canyon Nuclear Potufrr Plant, Unit 1 
Forwards IE Insp Roots 50-275/79-13 !. 30-323/78-13 on 
7BQB34-0922 & notice of violation. 

SPENCER.G.B. Region 5, San Francisco, Reactor Con itruc tinn t< 

Engineering Support Branch. 75/10/06. 2pp. 

7902360611 DOCKET 30-273 Diablo Canyon Nuclear Pouier Plant, Unit 1 
Notice of violation from insp on 780824-0922. 

* Region 3i San Francisco, Reactor Construction !< Engineering 

Support Branch. 70/10/06 Ip. 

7902360619 DOCKET 30-273 Diablo Canyon Nuclear Potuer Plant, Unit 1 
IE Insp RoptB 30-275/7B-13 t< SO-323/7B-12 on 7BOB2fl-0932. 
Noncompl lance noted: redundant electrical circuit separation. 
K1R8CH. D. F. , vORDERBRUEGQEN, HAYNE6, R, C. Reg Ion 5. Ban 

FranCiSED, Reactor Construction tt Engineering Support Bra-nth 
78/10/06. 14pp. 

7902230071 DOCKET 30-273 Diablo Canyon Nuclear Power Plant, Unit 1 
Forwards IE Bulletin 79-O1, "Environ Qua 1 if 1 cat! on of Class 
IE Equipment." U/list of 11 systematic evaluation program 
plants for which no action is required. 

ENOLEKEN, R. H. Region 5, San Francisco, Office of the Director. 

79/02/09. Ip, 

790227O3B3 BDCKET 30-273 Diablo Canyon Nuclear Power Plant, Untt 1 
Forwards IE Info Notice 79-03, "Liml torque Valve Geared 
Limit Switch Lubricant. " 

ENOLEKEN, H. H, Region 3. San Francisco, Office of the Director. 

79/03/09. IB. 

7902220202 DOCKET 30-273 Diablo Canyon Nuclear Power Plant, Unit 1 
Ack receipt of 79O11S Itr w/addl info re mutually redundant 
Class 1 circuits located in contra! room panels. 

ENOELKEN, H. H. Region 3, San Francisco, Office of the Director. 

79/02/05. Ip. 

7902220307 DOCKET 30-273 Diablo Canyon Nuclear Power Plant, Unit 1 
Responds to verbal NRC request for addl info re safety 
Implication analysis for control room pane Is, mutual 1 u 
redundant separation In solid state protection ays tt 
criteria for Insp of vertical part of control room panel. 
CRANEiP.A, Pacific Oas t. Electric Co. 79/OI/1S, 2pp. 

7702220210 DOCKET 50-273 Diablo Canyon Nuclear Power Plant, Unit 1 
Responds to NRC 7S1006 Itr re violation noted during inap 
Corrective steps are under way to conform to circuit 
separation methods In FBAI) & utll drauiing 050039. Insp d 
reword is expected to be completed by 790301. 
CRANE.P.A. Pacific Oas t> Electric Co. 7B/11/03. 2p P . 

7902260031 DOCKET 30-273 Diablo Canyon Mud ear Power Plant, Unit 1 
Transcript of 790207 hearing In Avila Beach. CA ro seismic 
evaluation of Class IE equipment, Pp 8739-0911. 

BOWERB.E.. MAFITIN.W.D. , HRIGHT.0.0. Atomic Safety and Licensing 
Board Panel. 79/03/07. 172pp. 

790326033& DOCKET 30-373 Diablo Canyon Nuclear Pouer Plant, Unit I 
Transcript of 79020B hearing in Avlla Deachj CA re aeismiE 
design (c earthquale probab 1 1 1 ty. Pp 8912-9O99. 

BOWERS, E,, MARTIN, W, E. , DRIGHTiQ.O. Atomic Safety and Licensing 
Board Panel, 79/03/OS. lS7pp. 

7902260060 DOCKET 50-279 Diablo Canyon Nuclear Power Plant, Unit 1 
Transcript of 790309 hearing In Avila Beach. CA re Class I 
Code, structural design tc seismic considerations. 
Pp 9100-9365. 

BOWERS, E., MARTIN, W. E. , BRIGHT, 0. 0. Atomic Safety and Licensing 
Board panel. 79/02/09. 163pp. 

7902320119 DOCKET 30-277 Peath Bottom Atomic Power Station, Unit E 
Informs that TRADOC Pamphlet 350-30, "Intarsorviee Procedures 
for Instructional Sijs Development" referenced in NUREQ-0319 
is available In microfiche form from NRC, 
BE8AW. M. J. Division of Document Control. 79/01/09. 3pp. 

7902090119 DOCKET 90-277 Peach Bottom Atomic Power Station, Unit 3 
Forwards revised title page, revised Page iv & neui Page 16-1 
for May 1970 physical security plan. Also forward! copies 
"Explanation of Revisions to Physical Security Plan" dtd 
Jan 1979. Pages d documents withheld (re-P 10CFR5.790). 
BRADLEY.E.J. Philadelphia Electric Co. 79/01/31. 3pp. 



38 



7903270335 DUCKET 50-277 !>,., n * 



l.d.lph , a Eit , ctr , 



DOCKETED ITEMS 



7902010244 DOCKET 50-277 Peach Bottom Atomic Pou.r Sttlon, Unit 2 
Foruardi IE Circular 79-02, "Failure of 120 Volt Vital AC 
Power Supp) lea, " 

OfilEn.E.H. Region 1, Philfldolphl*, Offite of th Director 
79/01/16. Bpp. 



HW.LEY.E.J. Pnil,d.l phl- - Elietpie 



7902200070 DOCKET 30-277 Peach Bottom AtomU Pouer Station; Unit S 
Respond! to IE Bulletin 7B-14, "Deterioration of Buna-N 
Components In ABCO Balenaldi. " Provldn tBtiitlci for 
CDntrol rad drive icram solenoid mnint. 
DALTRDFF. S. L. Philadelphia Electric Co. 79/01/S7. 13pp. 



MF-A7, Endorsement 

;,u, ..M^S. 

BRADLEV.E.U. Phi 1 ad, ,,, ia El ectri c C 



..ic P..., Station, unlt 2 
ffl * nt 93d MAELU ?<"<= 



o. 7 ,y O1/30 . 7pp . 



Brintn. 74/09/ls! 3p 



. ..... 

UDn. Nuel.. P 



Bpp 



c Co. , 



" 

cl B . a r- 



Product, Div. 



En S in fl)jr5 , ProjEct , 



Bottom 



Unu 2 



Hs^ 

DALTfiOFF, B.L Philadelphia El.ctric Co. 78/11/B9, Bpp. 






P '? ch DottDm 
insp on 



OIOBS.R.rt, LIC.IIM F 08 tan.g.mtnt Branch. 79/01/31. Ip. 



" ...... ' 



ORIHES,C. 



Plant S v .tm 



79/01/31 3 PP 



lO" 1 EIeCtr ' C C " Mucl "'- *-", Product. Div. 



BRflBLEV, E. J. PhUMBlphl. EUctrit Co. 79/02/13. Spp. 



ian':- notsd. 



' * n "" i>i 



.i.i. ,,H, 
' 



"" 



- - * 



, 

DflLTROFF, 8. 



' t r - " 

Philadelphia Electric Co. 



79/01/17. 



..... 

3pp. 



f" a . 7 P V Ch Bo ** M AtDffl " 
of violation from insp on 7B120S-OB 






i... 



DALTROFf.S.L- 



Electric C . 78/lS/Sa. 4 PP . 



2pp 



" BiDrl '' Phll " l ' 1 Phl.. Office of th. Director. 



^^E^^^^ 
^^su 1 ,:-^:^ ->- "-- 

R "" on '' Philadelphia, Office of th. Director. 



__. . ... . '-277 Peach Bottom Atomic Power Station, Unit 2 

rn^ T*^ P"atlng r.pt for Jan 1979. """ 8 

CDONE,M.J. Philadelphia Electric Co. 79/02/13, Ip, 



DOCKETED ITEMS 



7903210239 DOCKET 50-377 Peach Bottom Atomic Poutr Station, Unit 3 
Monthly operating rept for Jn 1979. 
ALDEN.U. M. Philadelphia Electric Co. 79/03/10. 10pp. 

790B010JIO DOCKET SO-277 Peach Bottom Atomic Poutr Station, Unit a 
Forward* LER 79-003/01T-0. 
CQONEYrM. J. Philadelphia Electric Co. 79/01/32. 3pp. 

7902010114 DOCKET 90-277 Peach Bottom Atomic Power Station, Unit 2 
LER 79-002/01T-0 on 79010B: cable *preading room cardan sijs 
dlinbled ul/o flreuatch pre*ent. Abance duo to failure of 
personnel to notify *hlft *upervior upon work completion. 
COONEY.M.J. Philadelphia Electric Co. 79/01/33. Ip. 

7902230130 DOCKET 90-877 Pch Bottom Atomic Pouer Station, Unit S 
Confirm Info re RO 2-79-6/1P on 790130: reclrculation motor 
generator lit room fire protection *y* out of vc for 
approximately B-h u/no firm watch po*ted. Cauiod by penonnal 
rror. 
ULLRICH.H.T, Philadelphia Elactrlc Co. 79/01/31. 2pp. 

7902330814 DOCKET 30-377 Peach Bottom Atomic Power Station. Unit 2 
Conflr* info ra RD 2-79-7/1P on 7ffOt31: itandby gai 
treatment fire protection (J out of *vc for approilmately 
8 dogs. Cauied by pertonnel error, 
ULLRICH,H. T. Philadelphia Electric Co. 79/01/31, 2pp. 

7903140139 DOCKET 90-277 Piach Bottom Atomic Pouar Station, Unit S 
LER 79-004/04L-0 on 790112: during .urveillance t>it of cabla 
spreading room smoke detector, annunciator could not bi reset 
bacauie it ua* not proptrly reiet previously. Detector lead 
disconnected to reset annunciator. 
CQONEY.M. J. Phlladalphla Elactrlc Co. 79/03/06. Ip. 

790214.0167 DOCKET 90-377 Peach Bottom Atomic Power Station' Unit 3 
' LER 79-003/03L-0 on 790109: BA offgai radiation monitor 

failed downt cale. Dirt on contact* of trip tet/iero calibr 
suitcti cauied Input key to remain deanargiied upon releaie 
o( twitch. Contact* were cleaned & monitor returned to Svc. 
COONEY.M.J. Philadelphia Elactrlc Co. 79/03/06. Ip. 



79032802SB DOCKET 90-277 Peach Bottom .Atomic Powir Station. Unit 3 
Forward* LER 79-006/01T-0. 
CQQNCV.M, J. Phlladalphla Elactrlc Co. 79/O2/14. 3pp. 

7903380260 DOCKET 30-277 P*ch Bottom Atomic Power Station. Unit 
LER 79-006/01T-0 on 790130: reclrculatlon motor generator *et 
roa fire detection iy (tmoks detector*) dliablad for mod 
work h not reitot-ed when work completed. Gamed bu personnel 
error, BUI rettored to ive upon dlicovery, 
COONGY.H.d. Philadelphia Elactrlc Co. 79/03/14. Ip. 

7903860404 DOCKET 90-277 Peach Bottom Atomic Power Station, Unit 2 
LER 79-QO&/03L-0 on 790HB:at power, routine *urvalllanc* 
ttt rtvRltd *tpoint of DPIS-a-14-438 uia* btloui Teli apac 
nln, Caund bg Inttrumtnt DPI8-2-14-438 baing out of calibr 
due to fetpnlnt drift. 
COONEV,H,J, Philadelphia Electric Co. 79/03/16. Ip, 

7903330119 DOCKET 90-378 P*ach Bottom Atonic Poutr Station, Unit 3 
Inform that TRADDC Pamphlet 390-30, "Intar*arvle Procadura* 
for Initructlonal By* D*valopm*nt" referenced in NUREO-0319 
i* avatlabla In microfiche form from NRC, 
BESAMiM. J. Diviilon of Document Control. 79/01/09. 2pp. 

7902090119 DOCKET BO-37B Peach Bottom Atomic Pouitr Station, Unit 3 
Forward* ravl*d title page> revlied Pag* iv ti niu Paga 16-1 
for Hay 197G physical lacurlty plan. Alia foruiardi coplt* 
"Eiplanatian of Ravliloni to Phljilcal Bacurltv Plan" dtd 
Jan 1979. Paga* b documinti withheld (raf 10CFR8. 790). 
BRWH.EV, E. J, PhlladBlphla Elactrlc Co. 79/01/31. 3pp. 



39 

7902260343 DOCKET 90-27B Peach Bottom Atomic Potusr Station. Unit 3 
FOTUardi lictniies responses re BUR purging t> vantlng. 
HRUNNER.E. J. Region 1. Philadelphia, Reactor Operations NucUar 
Support Branch. 76/OS/12. 3pp. 

7902140B1B DOCKET SO-27B Peach Dottom Atomic Power Station, Unit 3 
Forward* binder* fc sets of divider tab* for use u/NEDO-SlSBB 
"Marl 1 Containment Program Load Definition Rapt. " 
BOBON, L.J. Oineral Electric Co. .Nuclear Energy Product* Div. 
79/01/QB. 8pp. 

77032B03B3 DOCKET 90-376 Pach Bottom Atomic POUBT Station, Unit 3 
A* follouup to NRC 7B1119 requi*t for eubmittal of Offiite 
Dose Calculation Manual for approval, fnruardt guliJolinei for 
general contents of manual. 

GRIMES, B. K. Asiistant Director for EnglneEri t. Project*. 
79/Ot/ia. Spp, 

7902140240 DOCKET 30-278 Peach Bottom Atomic Pouir Station, Unit 3 
RgquiBt* addl 2, BOO to revitu application far amend. 
Riquotid action falli In amend fee Clataei 1 & 3 bccu 
riductlon In diichargi prtiourt for high prenurv aafetij 
uater pumpi Involvei tingle safety liiui. 
DIOOB, R. M, Llcen*e Fee Management Branch. 79/O1X31. Ip, 

7902220297 DOCKET 80-278 Peach Bottom Atomic Poiuer Station. Unit 3 
Re*pond to 790111 rque*t for review of paper "Vont 
Clearing During Simulated LOCA In a Hark I BUR 
Prellure-Buppresiion Sgi, " Recomraendi paper b( accepted for 
pub llcation. 
OfllHEB.C. Plant Bust. me Brunch, 79/01/31. app. 

790BOBD199 DOCKET 50-373 Poach Bottom Atomic Pouer Station. Unit 3 
Submit* Dec 197S program activity review. compriiBd of info 
from veltcted lection* of monthly rept, u/iectlon on contract 
ti billing *tatu* rimovBd, Llnti mietlngi held b provide* 
tatk-by-taik activity summary. 

BOBON, L.J. Oaneral EUctrlc Co. .Nuclear Energy Product* Dlv. 
79/02/03. 10pp. 



790222009B DOCKET 50-27B Peach Bottom Atomic Power Station, 
Forward I 2i BOO addl fee for 790112 llcin** amind 
appl Icatlon. 
BRADLEY, E. J, Philadelphia Electric Co. 77/03/13. Sff. 



7902010S23 DOCKET 30-27B Peach Bottom Atomic Power Btatlon, Unit 3 
Foruard* IE Imp Rept SO-278/7B-39 on 791129-30. No 
noncompliance noted. 

CARLSON, R. T. Region 1, Phlladalphla, Reactor Construction ti 
Engineering Support Branch. 76/13/30. 2pp. 

7902010336 DOCKET 30-27B Peach Bottom Atomic Power Station, Unit 3 
IE Imp Hept 30-378/7B-39 on 7B1129-30.No noncoaipl lance 
noted. Major area* Impacted: licnte '* Imp documentation of 
Clait I lu* prtnure retaining ueldi/componentE. 
dEHNIOAN.E. P. , HCBREARTY.R. A. , EBNETER.8.D. Rtglon 1, 
Philadelphia, Raactor Con*tructlan tt Engineering Support Branch. 
7B/12/19. 4pp. 

79022600BO DOCKET 30-27B Peach Bottom Atomic Pouer Station, Unit 3 
Forward* IE Inp Rept* 30-B77/7S-33 fc 30-27B/7B-36 on 
7B181B-20.NO noncompliance noted, 

BMITH.O.H. Region 1, Philadelphia. Fuel Facility I. Material* 
Safety Branch. 79/01/OB. Spp. 

79022600B9 DOCKET 90-378 Peach Bottom Atonic Power Station, Unit 3 
IE Imp Rttptt 90-277/7B-33 t> 90-27B/7B-36 on 781310-20. No 
noncompl lanci noted. Major area* Intptctid; chemical i 
radlochemical mia*ur*ment* program Including program for 
quality control of analytical mvaiurement* li audit results. 
KOTTAN.J.J., OLDSKI.O.M., STDHR, J. P. Region 1, Philadllphla, 
Fuel Facility & Material* Safety Branch. 79/01/OB. 10pp. 



7903270395 DOCKET 90-278 Peach Bottom Atomic Pownr Station, Unit 3 
Forward* 90-dv reiponie to NRC position* In 701117 Itr r* 
fire protection prooraw, Alio pretant* icheduli for 
lMpl*nntlna nil commitment* made to data re fire 
protection. 
DALTflOFF, S. L. Philadelphia Electric Co. 79/03/16. 99pp. 



7902030019 DOCKET 30-E70 Piach Bottom Atomic Pouer Station, Unit 3 
Ack rtcelpt of 7B1228 Itr Informing NRC of itapt taken to 
correct violation* noted In IE Imp Rapt* 90-277/73-24 t> 
SO-37B/7S-29. 

BHITH,0,H. Rtglon 1, Philadelphia. Fuel Facility & Material* 
Safety Branch. 77/01/13. Ip. 



7902290298 DOCKET 50-S7B Peach Bottom Atomic Pouer Station, 
Forward* reiponn* to Item* noted in NRC 7B1117 Itr n 
ph*ical lecuritv plan. Htl ulthtield (ref 10CFR3.790). 
8L Diltroff affidavit anel. 
BRAOLEY.E.J. Philadelphia Electric Co. 79/02/22. 4pp. 



7903090170 DOCKET B0-27B Peach Bottom Atomic Power Btatiom Unit 3 
Forward* NELIA Policy NF-140, Endor*ennt 83i HAELU Policy 
HF-47, Endonement 40i NELIA Binder EB-B & EB-*?j Endorsement 2: 
l> HAELU Binder XB-B t> XB-9,Endori*ment 2 for calendar gear 
1979. 
BflADLEY. E. J. Phlladalphla Elnctrlc Co. 79/01/30. 7pp. 



7902030023 DOCKET BO-27B Peach Bottom Atomic Pouer Station. Unit 3 
Retpondi to NRC 7S1207 Itr ra violations noted In IE In*P 
Rept 90-277/7B-24 (c 90-270/7B-39 on 7BOB30-31, 07O1 d 
0930-32. Corrective action*: ravlau of procedures re uholt 
body counting ay*. 
DALTROFF, 9. L. Philaotlphla Elactrlc Co. 7B/12/3B. 4pp, 

7903010244 DOCKET SO-27B Peach Bottom Atomic Pouer Station, Unit 3 
Forwards IE Circular 79-02, "Failure of 120 Volt Vital AC 
power Supplier " 

ORIER.B.H. Region 1. Philadelphia, Office of the Dlractor. 
79/01/16. Bpp. 



40 

7902340070 DOCKET 30-278 Piach Bottom Atomic Power Station, 
Re, pondi to IE Bull.tin 78-14, "Deterioration of Buna-N 
Compon.nts In ASCO Solenoids. " Provides statistic* for 

control rod drive icram solenoid main*. 

DALTHDFF.S.L. Philadelphia Elactrtc Co. 79/01/29. 13pp. 



DOCKETED ITEMS 



790221020B DOCKET 30-2BO Surrg Power Station, Unit 1 
Forwards copies of interim pages for modif ' t "; 
security plan w/comml tments util u,ill not meet 5 
Pages dBscribe measures to he taken pending inflta 1 lation & 
const of equipment. H/o end Iref 10CFR2. 790) . 
BTALLINQS.C.M. Virginia Electric it Pouier Co. 79/03/16, lp- 



7902130000 DOCKET 30-278 Piach Bottom Atomic Power Station, Unl 
Forward! IE Info Notice 79-01. "Bergen-Fater.on Hydraulic 
Shuck ti Suau Arreitors (HSHA). " 

OR1ER. B. H, Region 1, Philadelphia, Office of the Director. 
79/02/02. 3pp. 



7903260597 DOCKET 30-2BO Surrg Power Station, Unit 1 
Forwards citiien 781229 request for NRC to conduct 
hearing t. prepare EI3 en proposed replacement of steam 
generator*. _ , ,, -mint mi 

DENTOtJ.H.R. Office of Nuclear Reactor Relation. 79/02/01. 



2pp. 



7902280494, DOCKET 30-278 Peach Bottom Atomic Power Station, Unit 3 
Fnrwards IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment. ' U/1US of 11 .yitemstic valuation program 
plants For uhich no action i> required. 

SHIER, B. H. Region I, Philadelphia. Office of the Director. 

79/02/08. IP. 

7902210232 DOCKET 30-378 Peach Bottom Atomic Power Station, Unit 3 
Forward* monthly operating rept for Jan 1979. 
COONEY.M.J. Philadelphia Electric Co, 79/02/13. IP- 



7902260601 DOCKET 90-200 Burry Power Station, Unit 1 

Ack receipt of 7812H9 Itn denies request for EIB k show 

cause hearing;. 

DENTON.H.R. Of fit* of Nuclear Roactor Regulation. 

7902260604 DOCKET 50-280 Burry Power Statiom Unit 1 
Director's deci*ion under 10CFR2. 20i. Denies request by 
North Anna Environ Colition for show cause hearing to EIB 
re steam generator repair program. 
DENTON.H.R. Office of Nuclear Reactor Regulation. 



Sal. 



7902210333 DOCKET 3O-27B Peach Bottom Atomic Power Station, Unit 3 

Monthly operating rapt for Jan 1979. 

ALOEN.M.fl. Philadelphia Electric Co. 79/02/10. 10pp. 



7902010110 DOCKET 30-27B Peach Bottom Atomic Pouier Station, Unit 3 
Forwards LER 79-002/O1T-0. 
COQNEY.M.J. Philadelphia Electric CD. 79/01/22. 2pp. 

79O20101H DOCKET 30-27B Peach Bottom Atnmic Power Station, Unit 3 
LER 79-002/OJT-O on 790108: cable spreading room cardan syi 
disabled w/o flrewatch present. Absence due to failure of 
personnel to notify shift supervisor upon worl completion. 
CaONEY,H.J. Philadelphia Elictric Co. 79/01/22. lp. 

7902010173 DOCKET 50-278 Peach Bottom Atomic Power Station, Unit 3 
Forwards LER 79-002/01T-0. 
COONEY.rl. J. Philadelphia Electric Co. 79/01/3B. 3pp. 

7902010177 DOCKET 5O-278 Peach Bottom Atomic Power Station, Unit 3 
LER 79-OQ2/01T-0 on 79Q10B:roof vent stack instantaneous gas 
rrleaie rate above Tech 9pec limit due to valve operator 
failure, causing loss of inservlee RHR loop, rise in coolant 
tmp t gaseous release vis core isolation cooling valvei. 
COONEY.M.J. Philadelphia Electric Co. 79/01/22. lp. 

7902330130 DOCKET 50-27B Peach Bottom Atomic Puwer Station, Unit 3 
ConPivmi info re RO B-79-6/1P on 790130: rec irculation motor 
generator let room fire protection sys out of svc for 
pororlnitfly S-h w/nn firm watch posted. CauniJ by personnel 



ULLBICH.H. T. 



Philadelphia Electric Co. 79/01/31. app. 



790S230214 DOCKET 30-27B Peach Bottom Atomic Power Station, Unit 3 
Confirms info re RO 2-79-7/1P on 790131: standby gas 
treatment fire protection sys out of vc for approi imately 
B dau*. Caused by personnel error. 
ULLR1CH.W.T. Philadelphia Electric Co. 79/01/31. 2pp. 

7902210843 DOCKET 50-E78 Peach Bottom Atomic Power Station, Unit 3 
LGR 79-003/031.-0 on 7901 1 1; during unit shutdown for maint an 
instrument thutoff valve to pressure switch found closed due 
to personnel error. Unit operated 9 days w/instrumant out of 
svc. Appropriate disciplinary action taken. 
COONEY.M.J. Philadelphia Electric Co. 79/Oa/OB. tji. 



770S2703&3 DOCKET 50-278 Peach Bottom Atomic Power Station, Unit 3 
LER 79-001/03L-0 on 79011 1 : di scovered that recorded hi-hi 
trip valve for steam line radiation monitor uas 30 m*n-rem/h 
jreater than Tech Spec limit !i no corrective action taken. 
Caud bg procedural deficiency. 
COONEY.M. J. Philadelphia Electric Co. 79/02/09. lp. 

7902270391 DOCKET 30-27B Peach Bottom Atomic Power Station. Unit 3 
LER 79-004/03L.-0 an 7901 17: during surveillance test, setpoint 
of PS-3-14-44D found to be greater than Tech Spec mai. Caused 
by tatpolnt drift on slatic-o-ring Model 3N-AA3 pressure 
switch. Instrument recalibrated. 
COONEY.M.J. Philadelphia Electric Co. 79/02/13. lp. 



790EOB0213 DOCKET 50-200 Surry Power Station, Unit 1 

Endorsement 39 to Policy MF-57, w/changes in liability for 

VA Electric k Power Co. 70/10/14 

OERAS.T. Nuclear Energy Liability Insurance Anociation. 7B/1B/M. 

lp. 

79030B0206 DOCKET 50-2BO Surry Pour Station, Unit 1 

Endorsement 81 to NELIA Policy NF-1B6, ui/amend of Condition 4 
re bodily Injury or property damage insurance costs for VA 
Electric h Power Co. 
BARDES.C.R. Nuclear Energy Liability Insurance Association. 

79/01/03. lp. 

79020B0217 DOCKET 30-280 Surry Pnuer Station, Unit 1 
Endorsements 2 to Binders EB-27 t, EB-2B, u/changes in 
liability fur VA Electric fc Power Co. -o/ni/io 

OERAS.T. Nuclear Energy Liabilitv Insurance Association, 79/O1/18. 

IP- 

7902200025 DOCKET 30-2BO Burry Power Station. Unit 1 

endorsement for calendar year 1979 for NELIA Policy NF-1S6. 
Virginia Electric i. Poumr Co. 79/01/20. lp. 

79022i04il DOCKET 30-2BO Burry Power Station, Unit I 

Endorsement 22 to NELIA Policy NF-S40 for calendar year 

t oyq 

Nuclear Enemy Liability Insurance Association. 79/01/20. lp. 

7902260233 DOCKET 30-2BO Surry Pouier Station, Unit 1 

Forwards summary of PWR purging b venting experiences. _., no/n - 

8EYFRIT.K. V. Region 4, Dallas, Office of tht Director. 74/09/03, 

4pp. 

7902260385 DOCKET 30-EBO Surry Power Station, Unit 1 

As followup to NRC 7B111S request for submlttal of Qffslte 
Dose Calculation Manual for approval, forwards Guidelines for 
general contents of manual. 

ORIHES.B.K. Assistant Director for Engineers & Projects. 

79/01/18. 5pp. 

7902120213 DOCKET 50-BBO Surry Power Station. Unit 1 

Forwards 7B1229 Itr from North Anna Environ Coalition lo 
NRCirequesting EIB before steam generator replacement. 
Supports request ti urges public hearing on Issue. 

Truth in 'Power. 79/01/24. 3pp. 

7902130464 DOCKET 30-280 Burry Power Station. Unit 1 

Ack receipt of 790116 Itr requesting etenion of time for 
submittal of Tech Specs App 1. Due to rigid revitu schedule 
for all operating reactors, request extension of date to 
7902 38. 
SCHHENCER, A. 1 Operating Reactors Branch 1. 79/01/23. Hpp. 

79020B0236 DOCKET SQ-2BO Surry Poiuer Station, Unit 1 . 

In response to NRC 790125 Itr, forwards radiological effluent 
changes to Tech Specs for review. Completed application for 
license amend mill be provided by 79022Q, 
8TALLINCB, C.M. Virginia Electric t Power Co. 79/02/03. l&pp. 



7902220119 DOCKET 50-E80 Burry Power Station, Unit 1 

Informs that TRADDC Pamphlet 350-30, "Interservice Procedures 
for Instructional Syi Development" referenced in MUREQ-0219 
is available In microfiche form from NRC, 
BESAH.U. J. Division of Document Control. 79/01/09. 2pp. 



79020BOB43 DOCKET SO-2BQ Surry Power Station. Unit 1 

Eiplalns basis for 33X pressuriier narrow r*na.e level In 
proposed Tech Spec Change 72. Per phone request, level was 
chosen to provide operator iii/adequate time to act in event 

of spurious charging pump operation. 

STALLIN09, C. M. Virginia Electric * Power Co. 79/02/Q9, lp. 



DOCKETED ITEMS 



41 



7902210229 DOCKET 50-290 Surru Power Station. Unit 1 

Submits addl info re permanent solution to law Jitad lafetg 
Injection tt oulsida recirculation spray pump net positive 
suction head problems. W/att raasa & energy release data ti 
basis for dilution of flay restricting orifices. 
BTALLINQS. C. M. Virginia Electric !< Power Co. 79/03/14. 13pp. 



770506033? DOCKET 50-2BO Surrg Pokier Station, Unit 1 

LER 7B-03B/03X-1 on 701 109: review of operational data showed 
that quarterly calihr of nuclear power range instrumentation 
had not been par formed per schedul e, due to scheduling error. 
BAUCOM.T.L. Virginia Electric !< Pouer Cn. 79/02/02. 2pp. 



7902210899 DOCKET 90-350 Surry Pouier Station. Unit 1 

Forwards proposed Change 66 to Tech Spec* re surveillance 
testing, interviet testing. ASME Code Class 1,2 b component 
insp, containment spray pumps, weight loaded chfck valve, & 
pray t\|t motor operated valves. H/check for #4.400. 
BTALLINOB, C. M. Virginia Electric h Power Co. 79/02/14. 



32pp. 



79O2280SB6 DOCKET 30-aBO Surrg Payer Station. Unit 1 

Application for Change 76 to Licenses DPR-32 li DPR-37 to 
allow far removal of five part length control rods. Proposed 
Tach Spec Change 76 d 4, 400 check encl. 
BTALLIN08, C. M. Virginia Electric Ic Poyer Co. 79/O2/26. 



13pp. 



7-7O2O70074 DOCKET 80-2BO Burry Power Station. Unit 1 
Forwards IE Insp Repti 90-3BO/7B-34 b 3Q-2B1/7B-34 on 
7B1211-14. No noncompliancB noted. 

LONO.F, J. Region Z, Atlanta, Reactor Operationi Nuclear Support 

Branch. 78/12/29. 2pp. 

7902070076 DOCKET 90-2BO Burry Power Station, Unit 1 

IE Insp Repts 30-2BO/7B-34 t> 30-2B1/7B-34 on 78121 1-14. No 

noneompllance noted. Major areai Inspected: tilting diik check 

valvei, 1 Imitorque valve ac tuator*. valve disc & item 

eparation. Conducted 13 LER followups. 

LEU1B, R. C, , SKOLDS, J. L. Rlgion 2i Atlanta, Reactor Operation* 

Nuclear Support Branch. 7B/12/2B. 7pp. 

790206029? DOCKET 50-2BO Burrg Pouier Station, Unit 1 

Popular di Info re itatui of Unit 2 laui head safety injection 
pirmp test, outside rtculation spray punp,b Inilde 
reclrculation spray pump 1-RS-P-1B imp, 
BTALLINQB. C. M. Virginia Electric ft Poyer Co. 79/O1/31. 32pp. 

7902230139 DOCKET SO-2BO Surry Poyer Station, Unit 1 

Forward! IE Info Notice 79-01, "Bergen-Patenon Hydraulic 
Shock fc Siuau, Arrettori (HBSAJ. " 

O'REILLY, J. P. Region 2, Atlanta, Office of the Director. 

79/02/02, Spp. 

7902120217 DOCKET 30-350 Surru Pouer Btatl'on, Unit 1 

Forward! IE Bulletin 79-01, "Environ Qualification of Clan 
1C Equipment. " 

O'REILLY, J.P, Region 2, Atlanta, Office of the Director. 

7^/02/OS, 2pp. 



7902130177 DOCKET 30-380 Surry Power Station, Unit 1 

Repti that condenser cooling water outlet tmp decreased 

3. 3 F on 790125, Caused by an equal drop In river uater inlet 

temp. Ma corrective action attempted. 

STALLIMOS, C. M, Virginia Electric & Pouier Co. 79/02/08. lp. 



790220001B DOCKET 30-2BO Surry Pouier Station, I 
Foryard! LER 79-OO2/03L-0. 
STALLINOS, C. H. Virginia Electric I Payer CD. 



7902200019 DOCKET SO-2BO Surry Power Station, Unit 1 

LER 79-003/03L-0 on 7901 IS: electrical penetration bctujBeii 
turbine blflg b emergtncg nuiitchgear room not properly 
lealed, Caused by penetration being broken during previaue 
implementation of deiign change. 
STEMART.H.L. Virginia Electric fc Power Co. 79/02/1S. 3pp. 



7902220051 DOCKET 3D-S80 Surrg Power Station. Unit 1 
Ltr rept re cooling watflr temp differential on 790202. 
Difference between river uiater ambient tomp measured at 
station high level intake & cooling water at diicharge 
control sturcture eiceeded Tech Spec level. 
STALLINB8, C. M. Virginia Electric t> Power Co. 79VO2/19, lp. 



770222004B DOCKET 30-280 Surry Power Station. Unit 1 
Inform* of cooling mater discharge temp change rate on 
790203: rate exceeded 3 F/h for cooling water outlet temp h 
discharge coolant temp increased at about 4 F/h. No 
detrimental effects noted. 
STALLINOS, C.H Virginia Electric tc Pouier CD. 77/02/16. lp. 



7902260418 DOCKET 3O-2BO Surry Power Station, L 
Forwards LER 79-003/03L-0. 
BTALLIHOB, C. M. Virginia Electric l< Power Co. 



7902360429 DOCKET 50-290 Surry Power Station, Unit 1 
LER 79-003/03L-0 on 790124: error detected In calibr 
procedures for steam flow initrumentation. Caused btj error 
made when calibr procedures changed. 
STEWART. U. L. Virginia Electric (. Power Co. 79/02/20, 2pp. 

7902260437 DOCKET 30-2BO Surry Power Station, Unit 1 
Forwards LER 7B-047/03X-1. 
STALLINQS.C.M. Virginia Electric (. Poyer Co., 79^02/21. lp. 



7902310160 DOCKET 30-2SO Burrg Pouor Station, Unit 1 

Forward I IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment," W/liit of 11 lyitematie evaluation program 
plants for which no action ii required. 

O'HEILLV, J,P, Reoion S, Atlanta, Of flee- of the Director. 
79/03/OB. 2pp. . 



790226044B DOCKET 30-2BO Stirri) Power Station. Unit 1 

LER 78-047/03X-1 on 7B121 1: primary to secondary lealtdga in 
"C" iteam generator exceeded allowable limit. Causod by 
leakage through five iteam generator tubes. combined flow 
resulted in excessive leakage. 
BTEWART.H.L. Virginia Electric t, Power Co. 79/O2/21. Spp. 



79032S0163 DOCKET 50-280 Surru Pouer Station, Unit 1 

Forwards IE Info Notice 79-03, "Limitorque Valve Beared 
Limit Switch Lubricant." 

O'REILLY. J.P. Region 2, Atlanta, Office of the Director. 

79/OB/09. .2pp. 



7902250119 DOCKET 30-2B1 Surry Power Station, Unit E 

Inform* that TRADDC Pamphlet 330-30. "Interservice ProcmJurei 
for Instructional 9s Development" referenced in NUREO-0219 
li available in microfiche form from NFiC. 
EESAH, W, J. Division of Document Control. 79/01/09. 2pp. 



7902200032 DOCKET 50-SBO Surrg Power Station. Unit 1 
Forward! monthly operating rept for Jan 1979. 
8TALHNOB, C. M. Virginia Electric h Power Co. 79/02/13. lp. 

79O2200033 DOCKET 80-B80 Surry Power Station, Unit 1 
Konthlu, operating rept for iJan 1979. 
STEWART, W. Virginia Electric (c Power Co. 79/01/BE. 3?pp. 

7902020230 DOCKET BO-280 Burry Power Station. Unit 1 
Forward! LER 7B-041/03X-1. 
BTALLINOB, C. M. Virginia Electric It Power Co. 79/01/30. lp. 



790221020B DOCKET 50-2B1 Burru, Power Station. Unit 2 
Forwards copies of interim pages for modified amended 
security plan w/comml tmenti utll will not meet by 790323. 
Pages tfeicriba measures to be taken pending instal latioti t< 
const of equipment. M/o encl Iref IOCFR2. 790). 
STALLINOB, C. H. Virginia Electric t Power Co. 79/O2/t>. lp. 

7902260997 DOCKET SO-2B1 Surry Power Station, Unit 2 
Forwards citiien 7B1229 request for NRC to conduct 

' hearing & prepare EI8 on proposed replacement of steam 
generators. 
DENTDN.H. R. Office of Nuclear Reactor Regulation. 79/O2/01. 



2pp. 



7902020237 DOCKET 90-280 Sorry Power Station, Unit 1 

LEH 7B-041/03X-1 or, 701 121 : during performance of PT-39-1 at 
full power, tnubber l-MAPD-HSB-1418 had fluid level in 
reservoir, due to crack in reservoir glass. 
BTEHART.H.L. Virginia Electric tt Pouiar Co. 79/01/29. 2pp. 



7*02060322 DOCKET 30-2BO Surry Power Station, Ui 
Forwards LER 7B-031/03X-1 t< 7B-03B/03X-1. 
BTALLINOS, C. M. Virginia Electric (, Power Co. 



79/02/02. lp. 



7902060324 DOCKET 00-280 Surry Power Station, Unit 1 

LER 7B-031/03X-1 on 761001: during normal operation, Channel I 
praisurittr levtl {protection) L-I-439 drifted hlgh.Cued 
bg drift of electronic i*ro ad juitmtnt, in conjunction u/ 
leakage thru transmitter bijpasi/equalliing valve. 
QAUCOrliT.L. Virginia Electric Si Pouier Co. 79/02/02. 2pp. 



7902260401 DOCKET SO-BBI Burry Power Station, Unit 2 
Ack receipt of 7B1229 Itn denies request for EIS & shou 
cauie hearing. 
DENTONiH.R. Office of Nuclear Reactor Reoulation. 79/02/01. lp, 

7902260404 DOCKET 30-2B1 Surru Power Station, Unit S 
Director's decision under 10CFRB. 306. Denies request bij 
North Anna Environ Coalition for show cauie hearing & EIS 
re steam generator repair program. 
DENTGN.H.R. Office of Nuclear Reactor Regulation. 79/02/01. Spp. 

790BOB02 13 DOCKET 90-281 Surry Pouer Station, Unit S 

Endorsement 39 to Policy HF-97, w/chenges In liability for 

VA Electric d Power Co. 

OERAS.T. Nuclear Energy Liability Insurance Association. 78/12/14. 

lp. 



42 

79020BQ206 DOCKET 5Q-2B1 Hurry Power Station, Unit S 

Endorsement 51 to NELIA Policy NF-1B6, u/amend of Cnndition 1 
re bodily injury or property damago insurance casts for VA 
Electric t< Power- Co. 

BARDESiC.R. Nuclear En-ergy Liability Insurance Association, 
79/01/O3. Ip. 



7903000317 DOCKET 30-2B1 Surry Fouler Station, Unit 3 
End or a -omen Is 3 to Hinders ED-27 t EB-EB, w/changes In 
liability for VA Electric b Power Co. 

OERAB.T. Nutlffgr Energy Liability Insurance Association. 
Ip. 



7902200025 DOCKET 50-291 Surrij Power Station. Unit 3 

Endorsement for calendar year 1979 for NELIA Policy NF-196. 
Virginia EUctric t, Power Co. 79/01/20. Ip. 



7902260461 DOCKET 50-HBl Surry Pouer Station. Unit S 

Endorsement 32 to NELIA. Policy NF-240 for calendar year 

1979. 

Nuclaar Ensrja Liability Insurance Association. 79/01/20, 



7902260233 DOCKET 30-2B1 Surry Power Station. Unit 2 
Forwards lummaTij of PUR purging b venting eiperlences. 
BEYFRIT.K.V, Region 4, Dallas, Office of the Director. 

4pp. 



7902290333 DOCKET SQ-EB1 Surru fouler Station, Unit S 

At folloui/p. to NRC 7B1119 request for subraittal of Dffslte 
Dose Calculation Manual for approval, forwards guidelines far 
general contents of manual, 

GRIMES, U.K. Assistant Director for Engineers b Project*. 

79/01/1B. 3pp. 

7902120213 DOCKET 30-291 Surry Power Station. Unit S 

Forwards 7B1229 Itr from North Anna Environ Coalition to 
NRC, requesting EIB before steam generator replacement. 
Support* requei-t & urges public hearing on issue. 
* Truth in Power. 79/O1/24. 3pp. 

7103130464 DOCKET SO-2B1 Burry Power Station. Unit 3 

Act receipt of 790114 Itr requesting aitenslon of time far 

submltt-al of Tech Spec* App 1. Due to rigid review schedule 

for all operating reactors, request extension of date to 

790238. 

SCHWENCEfi, A. Operating Reactors Branch 1. 79/01/23. 2pp. 

79020B0236 DOCKET 30-2B1 Surrij Power Station. Unit 3 

In response to NRC 790159 Itr, forwards radiological effluent 
changes to Tech Specs For review. Corrip leted application for 
lictnie amend will be provided by 790220. 
STALL INOa, C. H. Virginia Electric t. Power Co. 79/03/OS. Ifipp, 

79020BOS43 DOCKET SO-281 Surry Power Station, Unit 2 

Explain* bail* for 33X. preisuriier narrow range level in 
propoiad Ttch Spec Change 72. Per phone request, level was 
Choi en to provide operator u/adequate tine to act in event 
of spurious charging pump operation. 
STALLINQB.C. M. Virginia Electric t Foyer Co. 79/03/03. Ip. 

7903810223 DOCKET 30-231 Burrg Pouier Station, Unit 2 

Submit! addl Info re permanent lolutlon to leu head safety 
Injection & outilde rocirculation spray pump net positive 
suction head problems. H/att mass b energy release data b 
bests For delation of flow restricting orifices. 
8TALLIN3a.C. H. Virginia Electric b Power Co. 79/03/14. 13pp. 

7902210S55 DOCKET 90-2S1 Sorry Pnwer Station, Unit 2 

Forward! proposed Change 66 to T*ch Specs re surveillance 
testtnfli initrvice test itig. A8ME Code Class 1.2 b component 
imp, containment iprau pumps>weight loaded check valve, b 
ipray tys motor operated valve*. W/chec* fur *4, 400. 
8TALLINOB.C. M. Virginia Electric t Power Co. 79/QB/14. 32pp. 



79022B0296 DOCKET BD-2B1 Burru Pouier Station. Unit S 

Application for Change 7.6 to Liceniet DPR-32 b DPR-37 to 
allow for removal of five part length control rode. Proposed 
Tech Spec. Change 76 & *4>400 check end. 
STALLINOS, C.H, Virginia Electric tc Pouiir Co. 79/03/36. 13pp. 

7903070074 DDCKET 90-BB1 Burru Power Station. Unit 2 
Forward! IE I-nsp Repts SO-2BO/7B-34 b 30-231/78-34 on 
761211-14. Ho noncomplianto noted. 

tDNBiF. J. Region 2- Atlanta. Reactor Operations Nuclear Support 

Branch. 78/12/29. 3pp. 

7902070076 DOCKET 30-331 Burry Power Station- Unit 3 

IE Insp Rflpts SO-SBO/7B-34 b 30-2B1/70-34 on 7B1211-14.NO 
noneortp Itinc noted. Major areas inspected; tilting disk check 
valvei, limlt-oriiue valve actuators, valve disc b stem 
separatinn. Conducted IS LER followups, 

LEWIS, R.C.i BKOLDS,J. L. Region Z, Atlanta, Reactor Operation* 

Nuclear Support Branch. 70/12/20, 7pp. 



DOCKETED ITEMS 



790206028? DOCKET BO-281 Surry Power Station. Unit 3 

Forwards info re status of Unit 3 loui head safety injection 

pump test. outside reculation spreu pump.b inside 

rec irculation spray pump 1-FiS-P-lB insp. 

STALLIN9B, C. M. Virginia Electric d Power Co. 79/01/31. 3.3pp. 

7902330139 DOCKET SO-2B1 Burry Pouier Station, Unit 2 

Forwards IE Infn Notice 79-01, "Dergen-Pnterson Hydraulic 
Shock b Sway Arresters (HSSA). " 

O'REILLY, J. P. Regioti 2, Atlanta, Office of the Director. 
79/02/02. Spp. 

7902130219 DOCKET 30-2B1 Surru Pouer Station, Unit 3 

Forwards IE Bulletin 79-01. "Environ Qualification of Class 
IE Equipment. " 

O'REILLY, J.P. Region S. Atlanta, Office of the Dimctor. 
79/02/OS. 3pp. 

7903210168 DDCKET 30-281 Sorru Power Station, Unit 2 

Forwards IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment." U/llst of 11 systematic evaluation program 
plants for which no action is required. 

D'REILLV. J. P. Region 3, Atlanta, Office of tho Director. 
79/03/OB. 2pp. 

79023B0163 DOCKET 50-2B1 Burry Power Station, Unit S 

Forwards IE Info Notice 79-03, "Li mi torque Valve Geared 
Limit Switch Lubricant. " 

O'REILLY, J.P. Region 2, Atlanta, Office of the Director. 
79/02/09. 2pp. 

790320003S DOCKET 30-2B1 Surry Power Station. Unit s 
Forwards monthly operating rept for Jan 1979. 
8TALHNQ8, C. M. Virginia Electric fc Power Co. 79/O3/13. Ip. 

7902200093 DOCKET 30-331 Surrg Pouier Station, Unit S 
Monthly operating rept for Jan 1979. 
BTEWAflT. W. Virginia Electric b Power Co. 79/01/2H. 39pp. 

7902130177 DOCKET 30-891 Surru Pousr Station, Unit 3 

Repts that condenior cooling uater outlet temp decreased 

3, 5 F on 790123. Caused by an equal drop In river water inlet 

temp. No corrective action attempted. 

STALLINOS, C, M. Virginia Electric b Power Co. 79/02/00. Ip. 



7902190347 DDCKET 30-291 Surry Power Station, U 
Forwards LER 79-001/03L-0. 
BTALL1NOB, C. M. Virginia Electric t, Pouer Co. 



tp. 



7903190390 DDCKET SO-3QI Surry Power Station, Unit 3 

LER 79-00 1/03L-0 on 7901 IS: personnel batch inner door & 
emergency escape manuiay not leak tested within 73- h after 
opening because escape manway safety lock bellevid broken, 
posing haiard. 
STEWART, W. L. Virginia Electric b Power Co. 79/03/03. 2pp. 



7902220091 DDCKET 30-2B1 Surry Power Station, Unit B 
Ltr rept re cooling water temp differential on 790303. 
Difference between rlva'r water ambient temp measured at 
station high level intake & cooling water at discharge 
control sturcture exca*ded Tech Spec level. 
STALLING8, C. M, Virginia Electric (< Pouer Co. 79/02/19. Ip. 

790322004B DDCKET 90-2B1 Surry Pounr Station, Unit 2 
Informs of cooling, water discharge tamp changi rate on 
790205:rate exceeded 3 F/h for cooling uiater outlet temp b 
discharge coolant temp increased at about 4 F/h. No 
detrimental' effects noted. 
STALLINOB, C. M. Virginia Electric b Powar Co. 79/03/16. Ip. 



7903220094 DDCKET 30-2B1 Burru Pouer Station, Un 
Forwards LER 79-OQ2/03L-0 & 79-003/03U-0. 
STALLINOS, C. M. Virginia Electric &t Pou*r Co. 



79/02/14. Ip. 



7903220096 DDCKET 90-2ai Burr-f Power Station. Unit Z 

LEU 79-003/03L-0 on 790120: during normal operation channel 
check ravealHd that preisurlier pressure channel I drifted 
above Tech Spec limit as compared, to channels II & III. 
Caused by failure of channel I pressure transmitter. 
BTEWART, M. L. Virginia Electric b Pouer Co. 79/02/13. Bpp. 

7902220100 DDCKET 30-3B1 Surru Powar Station, Unit 2 

LER 79-003/03L-0 on 790122; following containment entrance, 
equipment hatch escape airlock* outer door bias not proven 
sealed within 72- h from Initial opening. Cnuted bu, problems 
In sealing ixterlor hatch. 
BTEWART U. L. Virginia Electric fc Power Co. 79/02/13, Spp. 



7902260396 DOCKET 90-281 Burru Powar Station, U 
Forwards LER 79-004 /03U-0. 
8TALLINOB. C. M. Virginia Electric *b Powar Co. 



79/oa/ai. ip. 



DOCKETED ITEMS 



43 



790226039B DOCKET 30-281 Surry Power Station. Unit 2 

LER 77-004/O3L-O on 79O2O4-, setpo ints of seven main ateam 
afety vulva* not within Tech Spec limit*. Caused by normal 
tpoint drift. 
STEWART, W. L. Virginia Electric t, Pouer Co. 79/02/31. 2pp. 

7902Z6046Q DOCKET 30-281 Burry Power Station. Unit B 
Forwards LEH 7B-Q33/03X-1 & 70-O3B/03X-1. 
BTALLINQB. C. rl. Virginia Electric t, Power Co. 79/03/21. Ip. 

7702360472 DOCKET 50-281 Surry Power Station, Unit 2 

LER 7S-033/Q3X-1 on 7B0926: c irculating water outlet valve 
MQV-CH-200D failed to close whan operated electrically. 
Caused when actuator cam for "shut" torque switch bit a me 
uedged against torque switch hold down screw. 
STEWART. W. L. Virginia Electric & Pouer Co. 79/02/20. 2pp. 

790286047* DOCKET 80-2B1 Surry Power Station, Unit S 

LEU 70-O33/03X-1 on 7B1030: boric acid flow from boric acid 
tank to blander was interrupted. Caused by blockage of 
er(jtalliied bornn at elbow in llns 1"-CH~356-152. 
DAUCDM.T. L. Virginia Electric h Power Co. 79/03/2O. 2pp. 

77OS220119 DOCKET BO-2B2 Pralrio Island Nuclear Station, Unit 1 
Inform that TRADOC Pamphlet 330-30, "Inter service Procedures 
fOT Instructional Sys DevalapmBnt" referenced in NUHEQ-0219 
1* avallafali in microflch* form Prom NRC. 
BEBAWiU. J. Division of Document Control. 79/01/09. 2pp. 

7903120190 DOCKET 30-282 Prairie Island Nuclear Station,. Unit 1 
Raipondi to 79Q124 Itr identifying two alleged deficiencies 
In security plans. Believe* items ra not daf latencies b 
that most recent revision to plan meet stds of 10CFR73. 59. 
HAYER.L.O. Northern States Pouiar Co. 79/02/03. 3pp. 



7902090391 DOCKET 50-262 Prairie Island Nuclear Station. Unit 1 
IE Imp Rept* SO-20S/7B-20 i 90-306/76-30 on 701101-30. No 
nontomp 1 lance noted. Major areas inspected: operations, 
radiation protect! on. jecurity. maintenance, survai 1 lance 
testing, organ! lation t< administration & refueling shutdown. 
FEIERADEND. C. D. . HARN1CK.R.F. Regions, Chicago. Realtor 

Operations Nuclear Support Branch. 79/12/2?. 9pp. 

7902050014 DOCKET 90-2B2 Prairie Island Nuclear Station, Unit 1 
Forwards IE Insp Repts 30-382/70-19 fc 50-306/70-19 on 
701114-15. No noncompl iance noted. 

KEPPLERiJ.O. Region 3. Chicago. Office of the Director. 79/O1/OE 

2pp. 

7908080016 DOCKET 50-2B3 Prairie Island Nuclear Station. Unit 1 
IE Insp Repts 90-2B2/7B-19 t. 50-306/78-19 on 781114-13. No 
noncompl iance noted. Major areas inspected: routine, announced 
Imp of LER 70-16, t< IE bulletins b circular follouup 
relative to qualification of electrical equipment. 

HUQHEB.T. Region 3, Chicago, Office of the Director. 7B/13/36. 

Bpp. 

7902260526 DOCKET 50-2B2 Prairie iBland Nuclear Station, Unit 1 
Forwards IE Insp Repts 50-202/78-10 b 50-306/78-18 on 
7B1114-17 I. 781130-1301. No noncomp liance noted. 

DAVIS, rt, B. Region 3, Chicago, Fuel Facility & Material! Safety 

Branch. 79/01/12. 2pp. 

7903260341 DOCKET 3 0-2 B 3 Prairie Island Nuclear Station. Unit 1 
IE Insp Rapt! SO-2B2/7B-1B !, SO-306/7B-10 on 701114-17 tc 
781 130-1201. No noncomp 1 iance noted. Major areas inspected: 
radiation protection program for operation d refueling, 
including qual i f ications, 1 leenaee audits, trainlngi procedures 
HUETER.L.J., DUDRV.N.E., FIBHER.W, L. Region 3, Chicago, Fuel 

Facility t. Materials Safety Branch. 79/01/OS. 19pp. 



79O2190364 DOCKET SQ-SBS Prairie Island Nuc leap .Station, Unit 1 
Forwards detailed info on security plan implementation. Encl 
withheld (ref 10CFR2, 790). 
MAYER. L, 0. Northern States Power Co. 79/02/13. Ip. 



7902070009 DOCKET SO-3B2 Prairie Island Nuclear Station, Unit 1 
Ack receipt of 701221 Itr Informing NRC of steps taken to 
correct violation noted in 7Q12O4 imp rapt. 
HIND, J. A. Region 3, Chicago. Safeguards Branch, 79/01/36, 



Ip. 



77O22Q0042 DOCKET 90-2B2 Prairie Island Nuclear Station, Unit 1 
FoTinarits Endorsement 2 to Policy Binder ED-36 tc xn-34 for 
Unit 1 b Endorsement B to Policy Cinder Xfl-37 Sc XD-3t for 
Unit 2. Doth endorsements pertain to Calendar Year 1979. 
JQHNBDN.R.O. Northern States Pouier Co. 79/02/00. 8pp. 



7902120119 DOCKET SO-2B2 Prairie Island Nuclear Station, Unit 1 
Foruards IE Info Notice 79-01. "Bargen-Paterson Hydraulic 
Shock fc Suay ArrestorB (HSSA). 

KEPPLER.J. 0. Region 3, Chicago, Office of tha Director. 79/O2/02, 

Ip. 



7702370312 DOCKET 50-282 Prairie Island Nuclear Station, Unit 1 
Forwards Endorsement 49 to Policy NF-174 & Endorsement 41 
t& Policy NF-197 for calendar year 1979, 
JONSDN,R. 0. Northern States Poiuar Co. 79/O2/21. 3pp. 



7902210193 DOCKET 30-262 Prairie Island Nuclear Station, Unit 1 
Forwards IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipmint. " H/list of 11 eastenatit evaluation program 
plants for uhich no action is required. 
KEPPLER.J.O. Region 3, Chicago, Office of tha Director. 79/02/09. 



77O2260233 DOCKET 30-262 Prairie Island Nuclear Station, Unit 1 
Forward* summary of PUR purging b venting experience*. 
BEYFRIT,K.V, Region 4, Dallas, Office of the Director. 74/09/03. 

4pp. 

7702280388 DOCKET SQ-2B3 Prairie Island Nuclear Station, Unit 1 
Ai follouiup to NRC 701115 request for submittal of OPfsite 
DDIB Calculation Manual for approval, forward* guidelines for 
general contents of manual. 

GRIMES, B.K. Assistant Director for Enoineors d Project*. 

79/01/1B. Spp. 

77O222O078 DOCKET 90-582 Prairie Island Nuclear Station, Unit 1 
Forwards rept XN-NF-7B-44, "Generic Analysis of Control Rod 
Ejection Transient for PWRs. " 

WHITE. J. A, Elian Nuclear Co., Inc. dubs, of Enon Corp.). 
79/02/12. Ip. 

7902Sao079 DOCKET 50-202 Prairia Island Nuclear Station, Unit 1 
"Generic Analysis of Control Had Ejection Transient for 
PHHs." 

BURNBIDE, R. J, , KRYBINKI , T. L. , PfiUITT, D. W. Ex. on Nun lear Co, , Inc. 
dubi. of Eon Corp. ). XN-NF-7B-44. 79/01/31. 53pp. 

7908BB03D7 DOCKET 30-203 Prairie Island Nuclear Station. Unit 1 
Foruardi ECCB reanalysis using Feb 1978 version of 
Mast inghouse GCC9 evaluation model for large break LOG A 
analy sli. 
MAYER, L. 0. Northern States Pouiflr Co. 79/02/31,. Ip. 

79O2230311 DOCKET 30-2B2 Prairie Island Nuclear Station, Unit 1 
ECCS reanalysls for large break LOCA analysis based on 
Fel> 197B evaluation model. 
Northern State* Poyer Co. 79/02/21. 08pp. 

7902O9O390 DOCKET SO-SB2 Prairie Island Nuclear Station, Unit 1 
Forwnrdl IE Insp Rspti SO-2B2/7B-20 t* 30-306/7B-20 on 
701101-30. No noncompliance noted. 

FIDHELLI,0. Raglan 3, Chicago, Reactor Operations Nuclear Support 

Branch. 77/01/03. 2pp. 



7902270359 DOCKET SO-2B2 Prairie Island Nuclear Station, Unit 1 
Forwards IE Info Notice 79-03. "Limitorque Valve Geared 
Limit 8y itch Lubricant. " 

KEPPLER.J.O. Region 3, Chicago, Office of the Director. 79/02/09. 

Ip. 

790B15027B DOCKET 5O-3B3 Prairie Island Nuclear Station, Unit 1 
Forwards monthly operating rept for Jan 1979. 
MAYER, L. 0. Northern States Power Co. 79/02/12. Ip. 

7902200234 DOCKET 90-202 Prairie Island Nuclear Station, Unit t 
Forwards LEfi 79-002/03L-0. 
MAYER, L. 0. Northern States Power Co. 79/02/23. Ip. 

79022B0263 DOCKET 30-282 Prairie Island Nuclear Station, Unit 1 
LER 79-002/03L-D on 79O124: ili esel coaling uiater pump 22 
failed to start during surveillance test. Caused by stuck 
contacts In LICDN Micro-Switch 11-104. 
HUN3TAD.A.A. Northern States Power Co. 79/02/23. Ip. 

7903260056 DOCKET 30-384 Idaho State Univ. Research Reactor 
Amend 10 to Indemnity Agreement E-49 increasing amount of 
coverage in Article 3, paragraph 4[b)(2). 
BALTZMAN,J. Antitrust b Indemnity Group. 79/OH/1B. Ip. 

7902270336 DOCKET 30-204 Idaho State Univ. Research Reactor 
Forwards Amend 10 la Indemnity Agreement E-49 increasing 
coverage to *140 million, 
EASTMAN, P. H. Idaho State Univ. 79/02/14. 2pp. 

7902220119 DOCKET SO-2SS Fort Calhoun Station, Unit 1 

Informs that THADOC Pamphlet 330-30, "Intersarvico Procedures 
for Instruct ional Sys Development" referenced in NUflEQ-0219 
Is available in microfiche form from NRC, 
BESAH, H. J. Division of Document Control. 79/O1/09. 2pp. 

7902080240 DOCKET 50-205 Fort Calhoun Station, Unit 1 

Forwards appl for amend of 1 icense. proposed changes to Tech 
Specs, safety evaluation, t, check for *12, 300, U/Cer tif icate 
of Bvc. 
* LeOoeuf, Limb, Lelby d MacRae. 79/02/06. 3pp. 



44 



DOCKETED ITEMS 



7902030242 DOCKET 30-2B5 Fort Calhoun Station. Unit 1 

Application for Amend 35 to lic.nse to eliminate unnecfmapy 
environ monitoring requi rements cfianoe reporting. 
requirements accordingly. W/proposed cHangos to Tech Spncs. 
SHORT. T. E. Omaha Public Pauor District. 79/03/02. 17pp. 

790S200034. DOCKET 50-233 Fort Calhoun Station, Unit 1 

Correct* info sent 7B122B re practice of containment pursing 
(Turing normal plant operat i on. Hi 1 1 limit purglnu tn 90-fi par 
year to Iceep containment pressurm within Tech Bpeci, 
SHORT. T. E, Omaha Public Power DUtrict. 79,'02/Ot), 3pp. 

770228023(1 DOCKET 50-3B9 Fort Calhoun Station, Unit I 

Forward* IE Insp Rpt 30-3B5/70-1Q on 781211-15 h notice oF 
deviation. . 

MAD5EN, 0. L. Reoion A. Dallas. R>actor Operations Nuclear Bupport 

Branch. 79/01/03. 3pp. 

79QS3H0227 DOCKET 30-2B5 Fort Calhoun Station. Unit 1 
Notice of deviation from lr.sp on 781311-15. 

Region 4. Dallas, Reactor Optrations Nuclear Support Branch. 

79/01/03. lp. 

79022B0229 DOCKET SO-SB5 Fort Calhoon Station, Unit I 

IE Inap Rnpb 3O-2B3/7B-1S on 79121 1-13. None omp 1 i ance noted: 

failure to issue lummary refit Follouing annual 

rsqufll i Pleat i on program written Eiainlnatlon. 

HfiDaEW.Q. L. Region 4, Dallas. Huaetor Dj>oratiDn Huclnor 

Support Branch. JOKN30N. M. D. , CONSTABLE, 0, C. negionl. Dallfli, 

Office of the Director. 79/01/03. ipp. 

79O2(HO:i07 DOCKET 3Q-2B3 Fort Calhoun Station, Unit I 

Foriuardi IE Circular 79-03, "Fai ture of 120 Volt Vital AC 

Power E-uppl iea. " 

EEVFRIT-H. V, Fission 4, Dallas, Office of the Director, 77/01/14, 

7pp. 

7902090013 DOCKET 50-235 Fort Calhaun Station, Unit i 
flck receipt of 7901 SB 1 tr re audit frequency o-P 
environ. chemital b ecolagieol contractors. Concur* u/program. 
HADSEN.G.L. Region 4, Dallas, Float tar Qporatl oni Muc Isar Blip port 

Branch. 79/01/30, lp. 

7902080011 DOCKET 50-583 Fort Calhoun Station, Unit 1 

Corrects Page 4 of IE Imp Kept 30-SB5/7B-17 re annual audit 

of contractors. Period ic audit* are performed as nocuo iarg tn 

pravlile objective evaluation op ef Foe ttvonesB oP contractor 

programs. 

SHOflT.T.E. Omaha Public POUIBI- District. 79/01/10. lp. 

7TO20B0009 DOCKET 30-285. Fort Ca-lfioun Station, Unit 1 
Ack receipt of 790105 I tr re Imp on 791130-33. 
HADSEN.D. L. nag ion 4. Dallas, Reactor Operattoru Nuclnar 

Support Branch. 77/01/li. lp, 

7902030007 DOCKET 30-303 Fort Calhoun Station, Unit 1 

Responds to NRC 731211 1 tr re violation noted In IE Imp 

Rept 50-385/7B-1 7. Cnrrec tlve actions: jnort of chernlcal lagnonl 

bij batch release! (< Installation of roc i.rcul.0 1 ion ig 6ij 

790630. 

SHORT. T,E, Omaha Public Payer District, 79/QI/05, ?pp, 

7902030003 DOCKET 5O-285 Fort Calhoun Station, Unit 1 

Forwards IE In*p Hnpt 80-2O5/78-17 On 791120-22 f< notUi 
of violation. 

MABSEM, 0. L Region 4, Dallas, Reat tor Operations Nucluar 

Support Drartch. 78/13/14. Bpp. 

7903060005 DOCKET 3O-2Q5 Fort Calhoun Station. Unit 1 
Notice of violation frcjn Inap on, 701120-23, 

MADSEN.e.L. R&slon 4. Dallas, Reattor Dporatlona Nuclenr 

Support Branch, 79/12/14. lp, 

79O20B0006 BncKET 50-209 Fort Calhnun 3tfltiDnr Unit I 

IE Imp Rept 30-238/70-17 on 7D1 120-32. Noncornp 1 1 once noted: 
failure to maintain the pH of liquid chemical Ji*charg* 
ulthln limits of Tech Bjn?c 1.2.2-.6.0, 

MADEEN, 0, L. Region 4, Dallas, fleactor Operations Nucloar 

Support Dranch. 7B/18/I4. fipp, 

7902230149 DOCKET BO-EB9 Fort Calhoun Station, Unit I 

Forwards IE Info Notice 79-O1, "Bergen-Pa tenon Hydraulic 

Shack & Siuaii Arresters IH5SA>, " 

SEVFRIT.K. V. Region 4, Dallas. Office of the Director 79/02/01! 



7-J02280456 DOCKET 30-3Q9 Fort Calhoun Station, Unit I 

Foruaros IE Bulletin 79-01, "Environ Qualification of CUia 

IE Equipment." W/list of 11 systematic evaluation program 

plants for mhlcn no action is roqulritd. 

SEYFRIT.K.V. Region 4. Dallas, Office of the 1)1 rec tar. 79/02/OB. 



7902a000ai DDCHKT nO-S(J!! Turl Calhoun fltntton, Unit 1 
ForiiJaril* [! Info Notice '/f-Q'.l, "Llmltorqu* Valve Oeartd 
Limit Ilultch Lubricant." 

at, Office of the Director. 



BEVFfllT.K. V. 
lp. 



[luglun 4, 



7903130077 DOCKET SO-BOD Tort Cnlhoun Rtatlnn, Unit I 
Forunrdt mnntMy opurntinfl piipt for Jnri 1979. 
BHDHTiJ. E. Omaha I'ublic Coumr DUtrict. 79/02/00. 



lp. 



7"?0a 13007? DOCKKT 1W-HU9 l-'ort Calhoini fHatiqn, Unit 1 
Monthly operating rept for .(an 197V. 
HlCKl.e, B, J. Omaha nubile 1'uuier District. 79/Qa/Otl. IQpp 



7VOSOS01VO DflCHET SO-afJS l-'orl C 
I'uruiardB l.(-H 7'/-00;;/o:il,-0 
ANDIlEUfl. II 1- Ilmnlin f'ulillc I'uuier IHnlrlct 



tllntHin. Unit 1 
77/01/34, 



lp. 



790202019S DUCKET 90-8119 Kort Cnlhrn.n (Italian, Unit 1 

I.KH 79"003/0:)L0 an 7V01I7 renclur (irulettlvo BUS for aiUl 
power dli ti'lbut Ion channel rt trip *Btp<ilnt fluctuated 
iiQiicurneiwat Ivolu. Cnutiid by Dull h Houo H potentiometer 
moilulo jini't :iiMC)iy/OOl fnlluru. 
CONNOl-LliY, J. t. Ilmnha Public Pouier lUslpict. 7V/01/J?fl, a p p. 

790i!ODOI30 DllCKliT f)0at!D Tort Cfllhoun Illation, Unit I 
Fnnuardn UEB 7EI-Oia/o:il. -I. 
ANDntiUH.ll. I.. tlmahn I'ublic Piiwer Dlitrlct. 79/01/24. lp. 

7W20U0134 DOCKET 90-BHS Tort Calhoun Ulnlion. Unit 1 

I.Eft 7l1-OIB/03L"l un 7Hiyi!7: during routine milnt of ch*r)lno 
pump CM-ID. crack I it vnlvu tfluck at Piston ;i uim found, C*und 
by eiteinlvii vltiratlon durlnu operation, 
flTEVENO.J,, JDNlid, D, ()mnh Public I'OUIBT DUtrict, 79/01/19, If 

T/Omt,mift ni)CKI-:T UO-^lin l-'urt [;lhonn tltatlnn, Unit 1 
Forward* i.lifl 7(]-0()8/o:iL-l 

:ii ft, L. lliinl>a I'ublic I'owor Dlutrlct. VV/01/30, lp 



7'H>S(Jo(ra 1 V IMICKIiT 0'-SII9 Tort Colliouil fltfllion. Unit 1 

1.1-H '/O-OOB/im-l on 7(IOJ 1 4; CH-1C c).ar u i(ifl pump uns out for 

mn Int on lenhlng enil cnp.Crnc.k In valve block noted. Pump not 

limpurablu t< mtumed tn ivt CracV duo tu heavy utage I 

vicditlvg vibration. NBU block hiatrtlUJ 7'IOIOH. 

flTEVKNIl. J , JDNKO.U Omnlra Public I'UUIBT Dlitrlct, 79/01/2?, lp. 

79020hO;!7fl DOCKI'T 30-UOa I'oi-l Cullinun IHntlon, Unit I 
Foruarili l.lill 7U(>1 1/OIII,-! 

, I., Omslio I'ulillc I'uuier District. 7V/01/:iO. l(i 



7'JO?UhO:i7ll IHICIthT no-k'l)!) I'nrt Callinuit flUtlnn. Unit I 
lim 7I)-04l/o:il,-l un 7(lia07', f low rnU duriuUnclei far 
chart on I Fllliiv mil li notndi hnl I dt removal Hfflclvncy for 
Vh-titi found tn b* hnluw VV'/, rtp|>l li:fl linn for amend to Itctnn 
ru vsvUton uf vent 1 In I Inn fluu i^te reiiiilrimgnti tubrnltttd, 

. ANDIiliM!), II (linnhn I'liiillr I'Diunr District, 79/01/30, 3ff 



vw80Ao:)o:i UUCKI-T no-aoa run cai 

Foruarili l.RH 7V-OOI/OIT-0. 

rtHUHIiH3.fi, L. llmnha Mublli: I'nwor District 



ivtathm, Unit i 

77/01 /U I 



IP- 



>aofto:ioiJ piictmi so- ;;nn i.urt caihtmn tittiun. unit i 

l.t-0 7';-00]/UIT0 on 7901 II). durum chock of dluiel drlvin 
flr pump, eng ins caollnu fluid b-nllvd out of holding tint. 
Dleiel ungliiv coollnj tyi refilled (< mflrmul Italntlon vlv( 
found c totei). Vnl v optmoi! F, Hfv pump rtiturnod to twe. 
(IATt-11,0 llrnnhn I'ublli: I'tiuor Hi strict 79/01/31 3pp. 



7W22H01I9 DDCHI-.r no-UtHi Indlnti I'nliU [Itfltlan, Unit 3 

InPormt thnk TdrtDIIC ['(imphlst :iH()-;iO, " lnt*rnrvlc Procedurti 
For IntLructlonnl Hut nnveliiprnenl" rufomncBd In NUniiO~OHI9 
I* avnllabli* in mi irof Icliit fiirm from NfiC. 

,1 IKvl.ioit of Dociimont Control. 79/01/09, Sff. 



TiQ'M'IO'KS UOCHliT UO-iJfl^ Indlnn I'ulrtl Cltdtlun. Unit CJ 
tteiponili to HRC 7(lll^!l re<[iivtt fur (xldl Info re firo 
prulectlon (irogrftBi vevlnu. F-'orLinrdi info on iprlnkUr igi 
Hydrogen trullor uilll be r|)ljiced by bulk liu<Irngen itoragi 
Pacllltg. 

J f'uurer AiiUinr 1 ly lituU of Nou Vni'k. 79/03/06, 



7902aiOH46 DOCKET BO-ailft inilinn Point fitnllon, Unit 3 

Foruurd* rBtponmi to '/OIUIU vitqusit for addl Itifn re Hr 
protection prugrrtm fldmint tralivH con trola. Mdtl coven 
offiltt management posiUun, f Ire brigade poiltloni i- firt 
drlllu, 

, J Cower Authority fllflte of MBU York. 79/OS/I3. lift- 



790aa;i0179 DUCKET SO-BOA Initlnn Point tltntion. Unit 3 
Forwdrdl ttwlnion ^ ID t<:urUv I'lnn cnntnlnlng Plnjil 
requetil cUrl f t cation, line I wiihlmld (raf IOCFR3. 790) 
PGHHY.O, T. f'ou*r Author! lg Dtalu HP NHU Yorl. 79/02/14, l 



DOCKETED ITEMS 



790RB*0383 DOCKET 30-286 Indian Point Station, Unit 3 

Ai follouup to NRC 7B1113 request For submlttal of Dffsite 
Do-it Calculation Manual for approval , forwards guidelines for 
general contents of manual. 

OFIIMES.B.K. Assistant Director for Engineer! & Projects 
79/01/1B. 3pp. 

7903260092 DOCKET 30-286 Indian Paint Station, Unit 3 

Riqut-ltl addl sum of aOO. 00 for Class I duplicate fee for 

amend to Units 3 & 3 ETS. 

DICOB, R.M. License Fee Management Branch. 79/02/02. Ip. 

790226G60B DOCKET 30-286 Indian Point Station, Unit 3 

Requests addl turn of *BOO far Class 1 duplicate fie for 
amend bo Units 2 & 3 ETS. 

DIQOS. R. M. License Fee Management Branch. 79/02/O2. Ip. 

790214024B DOCKET 30-286 Indian Point Station, Unit 3 

Ack receipt of 7B1113 Itr raquesting util submit license 

amend application to incorporate requirements at 10CFR30 

App I into Tech Specs. Util needs addl time h will respond by 

790414. 

EARLY, P. J. Power Authority State of NIUI York. 79/02/08. Ip. 

7902200014 DUCKET 30-286 Indian Point Station, Unit 3 

Eubmlti di'ca specified in Section 401 Certification Par Jan 

1979. Concerns gross electrical output, rivor discharge, 

chemical discharge d species of fish. 

MONT I .H. A, Consolidated Ediaon Co. of Neu York. 79/02/09. 13pp. 

7902220124 DOCKET 50-2B6 Indian Point Station, Unit 3 

Forwards "Comparison of Indian Point 3 Nuclear Power Plant 
to ACFtS Resolved Oenerlc Items Contained in ACRS Rept 6 to 
URC. " Provides separate evaluation of ECCS pumps, emergency 
poutT, H2 control after LQCA & OA. 
EARLY, P. J. Pouer Authority State af Neu York. 79/02/16. 



7902530196 DOCKET 30-386 Indian Point Station, Unit 3 

Ack receipt of IE Bulletin 79-01, "Environ Qualification of 
Class. IE Equipment. " Provides rept on unqualified limit 
switches installed at facility) also provides justification 
for continued plant operation. 
EARLY, P. J. Pouer Authority State of New York. 79/02/16. 



55pp. 



3pp. 



7902270206 DOCKET 30-286 Indian Point Station, Unit 3 
Forwards IE Insp Rept 50-286/76-30 on 78 1029-1 125. No 
noncompliance noted. 

BRUNNER.E.J, Region 1, Philadelphia, Reactor Operations Nuclear 

Support Branch. 79/01/04. app. 

7902270216 DOCKET 30-286 Indian Point Station, Unit 3 

IE In*p Rept 30-2B6/7B-30 on 7B1029-1 125. No nnncomp 1 lance 
no tad. Major areas Inspected : plant operations! Including 
facility tours. physical protection, radiation emergency drill 
& environ surveillance. 

REBELDW8KI.T. . KEIMIO, R. R, .Region 1. Philadelphia, Reactor 

Operation* Nuclear Support Branch. 79/01/02. 10pp. 



790S1401BB DOCKET 30-366 Indian Point Station, Unit 3 
Forwards LER 79-002/Q4T-0. 
CAH1LL.W.J. Commonweal th Ediion Co. 79/02/O6 Jp. 

7902140193 DOCKET 30-286 Indian Point Station. Unit 3 
LER 79-002/04T-0 on 790108: reported activity oF 
precipitation sample eiceeded 10 times control station 
level. Caused by tritium releases from source othe! than 
plant, 
MASCIULLI.S. Commonwealth Edison Co. 79/02/0&. 3pp. 



7902220095 DOCKET 50-286 Indian Point Station, Unit 3 
Forwards LER 7B-038/04X-1. 
CAHILL, W, J, Consolidated Edison Co. of New York 



79/02/14. Ip. 



790222009B DOCKET 30-306 Indian Point Statlnn, Unit 3 

LER 7B-038/04X-1 on 7B1313: prec ipitation sample e.ceeded 1O 
times control station level. Caused by tritium releaiat Prom 
source outside facility. NY State Dept of Environ 
Conservation investigating area manufacturer. 
MASCIULLI.S. , Consolidated Edison Co. of Neu Ydrfc, 79/02/14, 

7903330119 DOCKET SO-aB7 Oconea Nuclear Station, Unit 3 

Informs that TRADDC Pamphlet 330-30. "Interaervice Procedures 
for Instructional SIJE Development" referenced In NUREG-0219 
Is available In microfiche form from NRC. 
DESAW, U. J. Division of Document Control. 79/O1/09. 2pp. 

790220006B DOCKET 50-287 Oconee Nuclear Station, Unit 3 

Forwards modified amended security p Ian, Revla ion 3. Explains 
chronology nf revisinns, Details withheld (ref 10CFR2. 790) 
PARKER, W, 0. Duke Power Co, 79/02/14. Ip. 

7902260392 DOCKET 50-2S7 Dconee Nuclear Station, Unit 3 
Forwards copies of Itr of Implementation for security plan 
Plan withheld (ref 10CFR2, 790). 
PARKER, W. 0. Duko Pouer Co. 77/02/21. Ip. 

7902020200 DOCKET 50-287 Oconee Nuclear Station, Unit 3 
Forwards requeat for relief from AEME Code Section IX 
requirements. Asserts performance of hydrostatic teat on 
feedwater header, downstream nf last header iaolotlon valves 
before steam generator, would be impractical. U/drauings. 
PARKER. W. 0, Dulie Power Co, 79/01/26. 5pp. 

790201017B DOCKET SO-2S7 Oconee Nuclear Station. Unit 3 
"Bt<U 177 Fuel Assembly Owner's Group Aiymmatric LdCA Loads 
Evaluations Program, Phase 2." Evaluated components include; 
reactor pressure vessel, fuel assemb H as, control rod drives k 
core flooding piping. 
" Florida Power Corp. 7B/10/10. 9pp. 

7902220039 DOCKET 50-287 Oconee Nuclear Station, Unit 3 
Responds to NRC 7BI113 Itr requesting proposed Tech Specs 
for radiological effluent control (, OPfaite Doae Calculation 
Manual. Plant to submit proposals by 790330 
PARKER, W, 0. Duke Power Co, 79/02/12. Ip 



3pp. 



7902O1O379 DOCKET 3O-2B6 Indian Point Station, Unit 3 

Foryai-ds IE Circular 79-02, "Failure of ISO Volt Vital AC 
POUBT Sup pi ies. " 

OfllERiB.H. Region 1, Philadelphia, Office of the Director. 

79/01/16. Spp. 



790215042B DOCKET 30-237 Oconee Huclear Station, Unit 3 
Ack receipt of IE Insp Repts 30-269/78-35,30-270/78-33 fe 
50-387/78-33 on 781311-14. No proprietary info. 
PARKER, W.O. DukB Power Co, 79/01/29. Ip. 



7902130004 DOCKET SO-2B6 Indian Point Station, Unit 3 

Forwards IE Info Notice 79-01, "Bergen-Paterson Hydraulic 
Shock d Suay Arresters IHSSA). " 

CRIER, D.H. Region I, Philadelphia! Office of the Director. 

79/02/02. 2pp. 



7902130431 DOCKET 30-3S7 Oconee Nuclear Station, Unit 3 
Forwards IE Inap Repta 50-3*9/78-35.50-270/78-33 !. 
50-2B7/7B-35. No noncompl lance noted. 

LONO.F.J. Region 2, Atlanta, Reactor Operations Nuclear Suouort 

Branch, 79/01/18. 2pp. 



7902380473 DOCKET 90-2B6 Indian Point Station, Unit 3 

Foruard* IE Bulletin 79-01, "Environ Qualification of Clana 
IE Equipment." W/list of 11 systematic evaluation program 
plants for which no action is required. 

GfUEFM). H. Region 1, Philadelphia, Office of the Director. 

79/03/OB. 2pp. 

790ai3QQBl DOCKET 50-2B6 Indian Point Station, Unit 3 
Forwards monthly operating rept for Jan 1979. 
BAYNE.J.P. Power Authority State of New York. 79/02/09. Ip, 

7902J300B3 DOCKET 3O-2B6 Indian Point Station, Unit 3 
Monthly operating rept for Jon 1979. 
CONNELL.C. Power Authority State of New York. 79/02/Oi. 6pp. 

7902J302SS DOCKET 30-2Bi Indian Point Station, Unit 3 
Monthly operating rept for Jan 1979. 

. A. Northern Stated Power Co. 79/02/01. flpp, 



7902230122 DOCKET 50-286 Indian Point Station, Unit 3 

Forward* tabulation of daily record of fish collections for 

Jan 1777, 

CAHIU..W.J. Consolidated Edison Co. of New York. 79/03/15. 4pp. 



7902150437 DOCKET 30-287 Oconee Nuclear Station, Unit 3 
IE Insp Repta 30-369/78-35,50-370/78-33 ! ( 50-287/78-35 on 
781311-14. No noncortipliance noted. Major areas inspected: 
licensee event repta,viaual insp of snubbers, housekeep ing 
ti cleanliness of reactor bld.gs. 

JAPE.F., ERODKS,E.H., BEWIB.H.C. Regions, Atlanta. Reactor 

Operatiuna Nuclear Support Hranch, 79/01/17. 5pp. 

79022S004H DOCKET 50-2B7 Oconee iNuc lear Station, Unit 3 
Ack receipt of IE Inap Repta BO-269/7S-33, 50-270/7S-36 (. 
30-287/78-38 on 79131B-29. No proprietary info. 
PARKER, W.O. Duke Pouier Co. 79/01/99. Ip. 

7902280049 DOCKET 30-287 Oconee Nuclear Station, Unit 3 
Forwards IE Inap Repts 30-269/78-38, 50-370/7B-36 !. 
SO-3B7/7B-3B. No noncomp 1 iance noted. 

LEH18,fi.C. Rogion 2, Atlanta, Reactor Operations Wuclear 

Support Branch, 79/01/22, 2pp. 

7902280057 DOCKET 80-387 Ocone Nuclear Station, Unit 3 
IE Insp Hepts 30-369/70-38,30-270/78-36 t, 50-287/78-38 an 
781218-39. No noncompliance noted. Major areas inspected: 
plant operations, malnt & LER followup. 

JAPE.F., LEHIS.R.C. Reg ion 2, Atlanta, Heat tor Operations 

Nuclear Support Branch. 79/01/19. 4pp. 



46 

7902280237 DOCKET SO-2H7 Qcones Nuclear Station. Unit 3 
Forwards IE Info Notice 79-01. "flergen-Patersoti Hydraulic 
Shod & Sway Arrestora 1HS5A). " 

O'REILLV, J. P. Region 3, Atlanta, Office of the Director. 

79/03/Oa. 3pp. 



7902120226 DOCKET 50-287 Oconen Nuclear Station, Unit 3 

Forwards IE Bulletin 79-01, "Environ Qualification of Class 
IE Equlpmant, " 

D'REILLY, J. P. Region 2. Atlanta, Office of the Director. 

79/02/03. 2pp. 



7902210175 DOCKET 30-297 Oconee Nuclear Station, Unit 3 

Forwards IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment. " U/llat of 11 tystematlc evaluation program 
plants fur uihich no action is required. 

O'REILLY, J.P. Region S. Atlantar Office of the Director. 

79/02/03. Spp. 



790aaa0090 DOCKET SO-2B7 Oconee Nuclear Station. Unit 3 
Forwards IE Info Notice 79-O3, "Llraitorque Valve Geared 
Limit Switch Lubricant, " 

O'REILLY, J. P. Region 2, Atlanta, Office of the Director, 

79/02/09. 2pp. 



7902060197 DOCKET SD-2B7 Dconee Nuclear Station. 
Forwards LEfi 79-003/01T-0. 
PARKER. H.O. Duke Power Cn, 79/02/01. 3pp. 



7^0a0602QO DOCKET 50-287 Oconee Nuclear Station, Unit 3 

LER 79-003/OIT-O on 79OllS:core flood tank oretsure reached 
632 piig due ta nitrogen header isolation valve being 
miitakonlg opened u/o timing containment iiolation valve. 
Personnel dl-scipl ined b pressure regulator adjusted. 
LEUIS, S, R, Duke Power CD. 79/02/01. 1p. 



7-302230018 DOCKET 30-287 Oconee Nuclear Station, Unit 3 
Forward* LEfl 79-001/03L-0. 
PARKEH.W. D. Duke Power Co. 79/03/13. Ip. 

7903320024 DOCKET SO>2S7 Oconee Nuclear Station- Unit 3 

LER 79-OQ1/Q3L-0 on 7901 1 1 ; unidenti f ied HCB leakage eiceeded 
Igptn. Caused bg package leakage from RCS valves 3RC-3 or 
3RC-3 &/Dr preisurlier instrumentation valve. Caused by 
leaking valve, mil) Em repaired at neit shutdnun. 
LEWIS. S. n, Duke Power Co. 79/03/13. 3pp. 



7902360400 DOCKET 30-237 Dconee Nuclear Station, Unit 3 
FoTuiardl LER 79-002/03L-0. 
PARKER, W. D, Dule Power Co. 79/02/19. Ip. 



7902260414 DOCKET 80-2B7 Oconee Nuclear Station, Unit 3 

LER 7V-002/Q3U-0 nn 7901 IB: control rod driveline AC VOltago 
pouier supply breaker failed to trip during on-line test. 
Caused bg failure of mechanic 1 inkage. Minor adjustments 
being made to trip mechanism. 
LEUIS, S. R. Duke Power Co. 79/02/19. 3pp. 



DOCKETED ITEMS 



790B2603BS DOCKET 90-289 Three Mile Island Nuclear Station, Unit 1 
Forward 4 certified copies of Endorsement 31 to MAELU policy 
HF-73 for calendar year 1979. 
OERETV, H. F. QPU Service Corp. 79/02/20. 2pp. 

7902260233 DDCKET SO-2B7 'Three Mile Island Nuclear Station, Unit I 1 
Foruiards summary of PUR purging fc venting uparlvnciB. 
SEYFRlT.K.v. Region 4. Dallas, Office of the Director. 74/09/03, 

4pp. 

7902030047 DOCKET SO-2B9 Three Mile Island Nuclear Station, Unit 1 
Forward i Amend 45 to License DPR-30, tf ety evaluation & 
notice of issuance. 
REID, ft. W. Operating Reactors Branch 4. 79/01 /IB, 2pp. 

790303004B DOCKET 30-289 Three Mile Island Nuclear Station, Unit 1 
Amend A3 to License DPR-30 changing Tech Specs to permit 
removal to storage prior to Cycle 3 refueling outage of 
steel gate presently separating spent fuel pools A t> Q. 
REID.R.U, Operating Reactors Branch 4, 77/O1/1B. 6pp. 

7903030049 DOCKET 30-BB9 Three Mile Island Nuclear Station, Unit 1 
Safety evaluation supporting Amend 4B to License DPR-50. 
Concludes that mods are acceptable ui/idded mas* urn* For 
assuring that spent fuel pool gate mill not be dropped. 
Recommends Issuance of amend. 
Office of Nuclear Reactor Regulation. 77/01/18. 1PP. 

7703030030 DDCKET 30-289 Three Mile Island Nuclear Station, Unit 1 
Notice of issuance of Amend 48 to License DPR-3D. 
RE1D.H.W. Operating Reactors Branch 4. 79/O1/1B. 3pp. 

7902210117 DOCKET SO-389 Three Mill Island Nuclear Btatlon, Unit 1 
Confirms rngt meeting scheduled for 790209 to discuss NRC 
imp program at facility. 

BRUNNER.E. J. Region 1, Philadelphia, Reactor Operations Nuclear 

Support Branch. 79/01/24. Ip. 

790201017B DDCKET 3O-EB9 Three Mile Island Nuclear Station, Unit 1 
"Bbu 177 Fuel Assembly Ouiner's Croup Asymmetric LOCA Loads 
Evaluations Program, Phase 3." Evaluated components include: 
reactor pressure vessel, fual asaembl lew, control rod drives & 
core flooding piping. 
Florida Power Corp, 7B/10/lb. 9pp. 

79013070347 DOCKET HO-2B9 Three Mile Island Nuclear Btatlon, Unit 1 
Forwards info re delayed schedule for complatino, mod to 
fire protection. Mark Involved In separating computer room 
from control room will be completed by end of I960 rofuallng 
outage rather than previously scheduled 1979 outage. 
HERDEIN.J.O. Metropolitan EdUan Co. 77/02/03. 2pp. 

7902070D4S DOCKET 30-289 Three Mile Island Nuclear Station, Unit 1 
"Evaluation of Trial Insp Program Involving Statistical 
Sampling Imp Techniques." Concludes concept ii not viable 
since cost would outueigh benefit!. 
NDLAH, F. J. Office of Inspection & Enforcement. 77/D1/2B. IBpp. 



7902270396 DOCKET 90-287 Oconee Nuclear Station. 
Forwards LER 79-007/OIT-O. 
PARKER, U. 0. Duke Pouor Co. 79/O2/22. Ip. 



7702270101 DOCKET 50-387 Oconee Nuclear Station, Unit 3 

LER 79-007/OIT-O on 77020B:Unlt 2 uias removed from svc for 
miint l< Tech Spetn required Unit 1 operability to be 
verified every 8-fi, which uas not done until 1O minutes past 
B-h 1 Imit. Caused by personnel Failure. 
LEHIS,B, B, Duke Power Co. 79/02/22. Spp. 



7902220119 DOCKET B0-a39 Three Mil* Inland NucUar Station, Unit 1 
Inform* that TRADDC Pamphlet 350-30, "Interaerviie Procedures 
for Instructional Bus Development" referenced in NURGQ-0219 
is. available in microfiche form from NRC. 
BEBflW, W, J. Division of Document Control. 79/01/07. 2pp. 

7902I301E9 DDCKET 50-SB7 Three Mile Island Nuclear Station, Unit 1 
Since NHC did not request addl info re manual hole stations 
design In fire protection BER, util uill not submit this info 
Pur approval on 79021 fe as previously indicated in 7B1Q05 
Ifcr. 
HERBE1N.J.O. Metropolitan Edison Co, 79/02/07. Ip. 



7902030100 DDCKET 50-289 Three Mile Island Nuclear Station, Unit 1 
Ack receipt of 781229 1 tr Informing NRC of steps taken to 
correct violation noted in IE Imp Rept 50-3B9/7B-19. 
DRUNNER.E.J. Region 1, Philadelphia, Reactor Operations Nuclear 

Support Branch. 79/01/12. Ip. 

7702050104 DOCKET 30-389 Three Mile Island Nuclear Statiom Unit 1 
Respond* to NRC 7B1207 Itr ri violation noted In IE Imp 
Rept 3C289/7B-19. Corrective actions: procedure change 
requeit re Filling t, venting reactor coolant sys 
implemented, startup steps clarified, 
HERDEINiJ.O. Metropolitan Edison Co. 7B/12/B9. 3pp. 

7902030103 DOCKET SO-2S9 Three Mile Island Nuclear Btatlon, Unit 1 
Forwards IE Insp Rept 80-287/76-19 on 7B1107-09 & 781113-17 
& notice of violation. 

DRUNNER, E, J. Region 1, Philadelphia, Reactor Operations Nuclear 

Support Dranch. 78/13/07. 2pp. 



7902050107 DOCKET SO-289 Three Mile Island Nuclear Station, Unit 1 
Notice of violation from insp on 781107-07 d 781113-17. 
* Region 1, Philadelphia, Office of tht Director. 78/13/06. 
2pp. 



79031 301 J 4 DDCKET SO-2B7 Three Mile Island Nuclear Station, Unit 1 
Forward* Endorsement 3i to NELIA NF-2HQ, 
OERETV.H. F. 0neral Public Utilities. 79/02/07. Ip. 

7902130133 DOCKET SO-239 Three Mile Island Nuclear Station, Unit 1 
Forward*. WEL1A Endorsement S for Binder Ell-Si !< ED-iS for 
calendar year 1979. 
OERETV, H.F, GPU Service Corp. 79/03/09, 3pp. 



7702090110 DDCKET 90-2B9 Three Mile Island Nuclear Station, Unit 1 
IE Insp Rept 30-2B7/7B-19 on 781107-09 h 7B1113-17. 
Noncompliance noted: nonconf ormance ui/adminlstratlve 
procedural controls in several areas, including Pilling tc 
venting reactor coolant ays b makeup & purification sys. 
HAYERKAMPi 0. R. , BETTENHAUSEN, L, , KEIMIO, R. R. Roion 1, 

Philadelphia, Reactor Operations Nuclear Support Branch. 78/15/06. 
16pp. 



DOCKETED ITEMS 



47 



7902010282 DOCKET 5O-2B9 Three Mile Island Nuclear Station, Unit 1 
Forward* IE Circular 79-O2, "Fai lure of 120 Volt Vital AC 
Power Supplies. " 

OHIEfl,B.H. Region 1, Philadelphia, Office of the Director. 

79/01/16. Bpp. 

7*02130009 DOCKET 50-2B9 Three Mile Island Nuclear Station. Unit 1 
Forwards IE Info Notice 79-Q1. "Bergen-Paterson Hydraulic 
Shoe* I Sway Arreston (HSSA). " 

CRIER, B.H. Region 1. Philadelphia. Office of the Director. 

79/02/02. 3pp. 

7902280470 DOCKET 30-289 Three Mile Island Nuclear Station, Unit 1 
Forward. IE Bulletin 79-01. "Environ Qualification of Class 
IE Equipment." W/list of 11 systematic evaluation program 
plants tor which no action is required. 

ORIER, B. H. Region 1, Philadelphia. Office of the Director. 

77/02/08. 2pp. 

7902300319 DOCKET SO-3B9 Three Mile Island Nuclear Station. Unit 1 
Forward! monthly operating rept for Jan 1979. 
HERBEIN, J. 0. Metropolitan Edison Co. 79/02/14 Ip. 



7902360343 DOCKET 5O-293 Pilgrim Nuclear Power Station. Unit 1 
Forwards licensees responses TE BWF1 purging It venting. 
OHUNNERj E. J Region i, Philadelphia. Reactor Operations Nuc 1 1 

Support Branch. 76/05/12. 3pp. 

79Q214025B DOCKET 50-293 Pilgrim Nuclear Power Station. Unit 1 
Foruards binders tc sets of divider tabs for use U/NEDO-2JBBB 
"Mark 1 Containment Program Loatf Definition flept. " 
SDDDN.L. J. Oeneral Electric Co., Nuclear Energy Products, Div. 
79/01/OB. Bpp. 



79O23a03BS DOCKET 5O-393 Pilgrim Much 



Station. Unit 1 



As follouup to HFiC 7B1113 request far submittal of Offtit-e 
Dost Calculation Manual for approval, forwards guidelines fi 
general contents of manual. 

79/OI/1H. 5pp. 



790aQ10fllO DOCKET 50-393 Pilgrim Nuclear Pcuior Station, Unit 1 
Forwards guidance for general contents of Dffiite Dose 
Calculation Manual as aid in preparation oF Tech S.pecs. 
1PPQLITO.T. A. Operating Reactors Branch 3. 79/01/53. 7pp 



79022BQ323 DOCKET 50-289 Three Mile Island Nuclear Station. Unit 1 
Monthly operating rept For Jan 1979. 
MITCHELL. D. 0. Metropolitan Edison Co. 79/O2/O9. 7pp. 

7903060364 DOCKET 50-289 Three Mile Island Nuclear Station, Unit 1 
Forwards LEH 79-001/03L-0. 
HEHBEINpJ.G. Me tropol itan Edi son Co. 79/O1/3Q, Ip. 

79020,60272 DOCKET 30-389 Three Mile Island Nuclear Station, Unit 1 
LER 79-001/03L-Q on 79O1O7: during inservice insp test on 
decay heat river water pump lA(DR-Pla ), vibration level was 
uiitjiin "Required Action Range. " Caused by imbalance du* to 
rag in punp section b perturbed by shaft sleeve wear. 
MITCHELL, D. 0. Metropolitan Edison Co. 79/O1/30. Ip, 



7903220102 DOCKET 30-239 Three Mile Island Nuclear Statii 
Forward* LER 79-OOS/03L-O 
HERBEIN, J. Q. Metropolitan Edison Co. 79/02/OB. Ip. 



Unit t 



79-02220106 DOCKET 30-2B9 Three Mile I. land Nuclear Station, Unit 1 
LER 79-QQ2/03L-0 an 790112:uihen actuation signal uas applied 
tn open value from its mid-position DH-V-5B. motor breaker 
trippod. Caused by motor brake not releasing. Brake will be 
inpctd by 79O331, 
STANLEY, W. S. Metropolitan Edison Cp. 77/O2/OS. Ip. 



7902220237 DOCKET 5O-293 Pilgrim Nuclear PDUPF Station, Unit 1 
Responds to 790111 request for review of paper "Vent 
Clearing During Simulated LDCA in a Mark I DWfi Pressure- 
Suppresaion Sys. " Recommends paper he accepted for 
p irb 1 icati on. 
GRIMES, C. Plant Systems Brnncli. 79/01/31. 2pp. 

79Q212O2O3 DOCKET 30-293 Pilgrim Nuclear Pouer Station. Unit 1 
Informs of results oF analysis per Table 3,3 of safety 
evaluation supporting Amend 35 to operating license. 
Describes effects of postulated fire damage !< mods to 1SS/ 
120 vol ts DC oy E 
ANDOGNIMI, 0. C, Boston Edison CD. 79/02/0-1, 4pp. 

79020B0195 DOCKET SO-393 Pilgrim Nuclear Power Station. Unit 1 
Submits Dec 1973 program activity rov I cuii c ompr i Bed of info- 
from selected sections of monthly rep t , in/section on contract 
t< billing status remove-d , Li st s meetings held li provides 
task-by-task activity summary. 

BGHON.L.J. General Electric Co.. Nuclear Energy Products Div. 
79/OS/05. 10pp. 

79020B03Q-1 BUCKET SO-293 P 1 Lgr im Nuc loar Power Station, Unit 1 
Requests amend to DPR-39, paragraph 3. F. to allow changes to 
Implementation dates In Table 3 re fire protection. 
HOWARD. J. E. Boston Edison Co. 79/02/05. 3pp. 



7902220119 DOCKET 30-293 Pilgrim Nuclear Pouer Station. Unit 1 
Informs that TRADDC Pamphlet 330-3O, "Interservice Procedures 
For Instructional Sys Development" referenced in NUREG-0219 
Is available in microfiche form from NRC. 
BESAU, W. J. Division of Document Control. 79/O1/09. 2pp. 



7902260325 DOCKET 5O-293 Pilgrim Nuclear Power Station, Unit t 
Proposes specific mods to flp p A of License DPfi-35 Tech 
Specs, in response to NRC Itrs to all EUR 1 1 censce-E. Cone lud es 
amenfl eiempt from fees.W/cncl License DPR-33 & Tech Specs 
HOWARD. J. E. Boston Edison Co, 79/02/21. 59pp. 



7902130191 DOCKET 30-293 Pilgrim Nuclear Power Statioo, Unit 1 
Submit! addl info to fire protection Tech Spec requirements. 
Info clarifies tuo earlier analyses submitted 790116 re 
luppretsion of charcoal fire in augmented offgas sys. battery 
room ventilation air flou monitor i, air storage. 
ANDOGNINI.Q, C. Boston Edison Co. 79/02/O5. 4pp 



79O2Q10367 DOCKET 30-393 Pilgrim Nuclear Potuer Btation, Unit i 
Foruards IE Circular 79-O3, "Failure of 12O Volt Vital AC 
Poiuer Supp 1 i es. " 

SHIER, D.H. Region 1, Philadelphia, Office of the Director. 

79/01/1*. 9pp. 



7^023*0310 DOCKET 50-293 Pilgrim Nuclear Pnuier Station. Unit i 
Forwards modified amended security plan copies 1,2,3,4,9 & 
Revision 3 dated 79010B. Encl withheld (ref 10CFR2. 790). 
ANDDQNINI, 0, C. Boston Edison Co. 79/O2/13, Ip. 

79O326O321 DOCKET 50-293 Pilgrim Nuclear Pouer Station, Unit 1 
Advise i facility will not completely meet physical security 
requirements prior to 790223, Forwards list of sys which will 
be functional on that date & date when all ays will be 
operational. List withheld (ref IOCFR2.790). 
ARMSTRONG, W, J. Boston Edison Co. 79/02/14. Ip. 

770227O190 DOCKET 50-293 Pilgrim Nuclear Power Station. Unit 1 
Provides results of analysis completed per safety evaluation 
supporting Amend 35 to License DPR-35. Discusses fire 
protection issues, including prevention of spread of 
tomSuitiile liquid via drains. 
ANDDGMIN1, 0. C. Boston Edison Co, 79/03/30. 3pp, 

7902OHO262 DOCKET 50-293 Pilgrim Nuclear Power Station. Unit 1 
Forwards financial info requested by NRC:monthly income 
statements for Oct,Nov d Dec 1976, Form 10-K lull! be 
foruiarded when available, 
BUTLER. R.M. Boston Edison Co. 79/O1/27. 26pp. 

79OBH10244 DOCKET 30-293 Pilgrim Nuclear Power . Station, Unit 1 
Forwards Amend 49 to Indemnity Agreement NF-1BB d Amend S to 
Indemnity Agreement XB-31 , refl ecting changes in subscribing 
compani BE. 
FOULSHAM.P. A. Boston Edison Co. 79/02/lfl. 4pp. 



790B130Q24 DOCKET 50-293 Pilgrim Nuclear Power Btation, Unit I 
Forwards IE Info Notice 79-01 , "DerQ en-Pater son Hydraulic 
Shock d Sway Arresters (HSBA). " 

GRIER,D.H. Region 1, Phi Ud elph i a, Office of the Direct 

79./02/03. Ip. 

7902130063 DOCKET 50-293 Pilgrim Nuclear Power Station, Un 
Responds to 781219 1 tr in/IE Bulletin 76-14. "Detei-iora tt 
of Buno-M Components in ASCO Solenoids." Provides achedu 
for installation i< packaging Pf Buna-N applications in 
control rod scram systems, 
ANDOGN1MI, G. C. Boston Edisnr. Co, 79/02/02. 3pp. 

7*J02EOC027 DOCKET SO-293 Pilgrim Nuclear Homer Station, Unit 1 
Requests eitension of submittal date until 790330 for 
proposed Tech Sp-ecs, updating current inservice inap pTogram 
to he consistent lo/letest edition of ASME Section XI. Hi SI 
submit insp ti test prograni description by 79Q513. 
ANDDQNINI, Q. C. Boston Edison Co, 79/Off/OB. Ip. 

7903330479 DOCKET 5O-E93 Pilgrim Nuclear Pouer Station, Unit 1 
Foruiarifs IE Bulletin 79-O1, "Environ Qua 1 i F) cation of Class 
IE Equipment." W/list oF 11 systematic evaluation program 
plants -fop uhith no action is required. 

GRIER.B.H, Region 1, Philadelphia, Office o-f the Director. 

79/02/OB. IP. 

790S2200B1 DOCKET SO-293 Pilgrim Huelear- Power Statipn. Unit 1 
Forwards monthly operating rept For Jan 1979 
MCQUIRE. P. J. Doston Edison CD. 79/02/0-8. Ip. 



48 



DOCKETED ITEMS 



ton EdiSDT , Co 



cErtmteos 

LET-Uflcate of Svc t, amend to Certificate nf Svc f or iNOC 

affld^iU I"** 1 " 1 dl9p Slti '"' ""- "" 790301. FM Al.eter 
CDDDARD.R. Commonwealth Edisun Co. 79/03/09. 15pp 

79023300S6 DOCKET 50-295 Z 1 on Nuclear Paw Static, Unit 1 
nut, on f or sum marg d ispos it i nn. Urges dlBmissal of Stats of 

It.u. US ! JT K C ' 7 : B<9 fc '" """ lack Df a Bnu*n. Mtl 
issue of fact to be ad jud irated. Affidavits of Hnsford, 

n i " Da !! oh "' AIl " tttr * Ccl - tif i"t e of sv . nc i 

D, R. J. Branch 2. 79/01/31 SOpp 



7902090306 DDCIM-IF 50-3,3 PUgrim 
ForuiariJs LER V9-O02/03L-0 
MCGUIRE.P.J. Boston Edi 5 on Co 



Station, Unit 1 



79/03/Ot. lp. 



. 

removed from 5 vc to investigate low flou condition. For about 
2h personnel cleaned t- readjust^ d,rt y controller Alarm 
MA?...e a dl?l ual(? t( detect problem of this nature 
MATH! 3, C J Boston Edison Co. 79/03/06 lp 



7903200035 DOCKET SO-293 Pilgrim Nucl 
Forwards LEn 7?-003/Q3L-0 
MCGUlfiE.P. J. DBS tun- Edison Co. 77/03/12 



Power Station, Unit 1 



- 

on 7901 14: aunng control roil eicrcise 
urve. llance control rod 30-15 UDU1- not respond to ns 
signal Caused fly slight indentations nn teflon discs of 
Four directional control valve movable core 9 
Uoston Edison Co. 79/O2/I2 In 



Po 



7902S6040D DOCKET 9O-a?3 Pilgrim Nuc 1 B 
Forujirda t_ER 79-O04/03L-0 
MCGUIWE.P. O. Iloston Edison Cn 77/O2/I3 



Station. Unit I 



monitoring si| B Failed Caused by sample line fr 
MftTHIB.C.J. Gorton Edison Co. 79/O2/12 lp 



VWKB301I7 DOCKET 90-275 Zlon Nuclear Pouer Station, Un.t 1 
Informs that THADDC Pamphlet 3SO-30, "InterservicE ProcEdurea 
Instructional By 5 Development" reFerenc^ in NUREO-0219 
J* available in microfiche Form from MRC 
REBAW.H. J. D.vlsio of Decent Contrnl. 79/01/09. Bpp 



7MM6033I DOCKET 90-295 Zion Nuclear Power Station, Unit 1 
informs NFIC of contract arrangement u/Marsh J, McLennan 
rmtetcion Consultants to perform various fire protection 
rune t i ons. 
WAUGHTON.W. F. Commonwealth Ediann Co, 79/01/31 2pp. 

79033000*3 DOCKET HO-395 ZUn Nuclear Power Station. Un.t 1 
Forwards Interim security plan for facilities describing 
compensatory measures to be implemented on 79D223.Encl 
withheld (rf 1OCFR2. 7901. 
HEED,C. Commonwealth Edison Co. 79/02/O3. lp. 

7902200261 DOCKET BO-3-J5 2 i on Nuclear Pomor Station. Unit I 
,nr.^%^ 3Sit> " *" lrlterim "Mt plan Encl withheld (ref 



. 790 1 . 

Commonweal tJi Edison Co. 



79/02/20. 



IP. 



7903380265 DOCKET SO-27S Zion Nuclear Po^er Station, Unit 1 
Foruartls Revision 1 to madifirtl amende.! sccuritg plan for 
Dr* S d B n t, Ouatl-Citios !. Revision 3 to modiFled amended 
secwrlty plan for Zion. Encl withheld (rcF IOCFR3.79O) 
LEE. D, Commonuea-l th dison Co 79/02/30. lp. 

7?D3QSQ30l DOCKET 59-393 Zion Nuclear Pouer Station, Unit 1 

*l?l T*S o i 1 l "?S*2 n F ? F SUfPrnar "'.^Pcsition uf Contentions 
6(cJ,7,S,9 !, 14. Previous filings it, proc Bedinfl, answers, 
atatemfnt, A aFFi davit 1 at i Mt l fact re those contentions. 
W/nel I tr to 11 Eggert. 

^ EPTDE ' PP " BIELAMSKI. rt .P.. Isha m , Lincoln t, Deal,. 



7903030321 DUCKET 50-295 Z i on Nuclear Power Station, Unit 1 
Order follaunna 78 1 1 SO prshearing conference in Haufceoan. IL 
fidmltB State of Il_ to Future public hearing as intervenor 
Admits t, rajetts ccrtatn contentions, propounds questions to 
each of the parties 
LUTON.E. Atomic Safctu and Licensing Board Panel. 79/01/19. 



Hpp. 



7902230136 DOCKET 50-295 Zion Nuclear Power Station Unit 1 
Forwards 197B Annual Rept for utll 
BRE6EMANN, R. W. Commonwealth Edison Co. 79/02/13 lp. 

7902230194 DOCKET 30-295 Zion Nuclear Power Station, Unit 1 
I97Q Annual Rept. Revi ems 197S, five year summary of 
operations t. m B t, t. flnanical statement. 
* Commonweal th Edison Co. 78/12/31, 24pp. 

790221033B DOCKET 50-393 Zion Nuclear Power Station, Unit 1 
HU 1 "!? 3 !^ 3 Endol ' 5en ">nt No 2 to Hinder. EQ-1, XD-1 , ED-2, XQ-3, 
EH-3. XG-3, EB-29, XD-39, ED-3O, XD-3O, EB-43, XB-43, EB-43, XD-43, 
evidencing secnndarij financial protection. 
DSTER.J. Commonwealth Edison Co. 79/O2/14. 15pp. 

7902310240 DOCKET 50-295 Zion Nuclear Power Station, Unit 1 
HSr U S * r^'! 5 * Indemnlt Agreement NF-13, Amend 97 to 
UB an? * ? tD NF -' B7 ' An>*nd 47 to MF-54. Amend 45 to 
NF-M.Ari.nd 39 to MF-64. ,, AfnBna g to NF . g33 f J ,, 



09TGR,J. Commonuealth Edison Co. 79/02/14. 



Spp. 



"Forwards ^mmar B " 3 ' ?5 ^^ NuC ' Bar Poiuer Station, Unit 1 

SEVFHIT.K.U. Region 4, Delias, Office of the Director. 74/09/03. 

"Forwards nT 5 " a95 Z ' n Nuclear Poluer action, Unit 1 

BCHHENCER.A. Operating Reactors Branch I. 79/01/16. Spp. 

7902010273 DOCKET 50-295 Zlon Nuclear Pow H r Station, Untt t 
aUowable r ' * Ame " d M *" DPB ~ flB ""ueing MI 
aw rate surveillance requirements. 

Operating Reactor. Branch 1. 79/01/16. 3pp. 

7902010376 DOCKET 30-295 Zion Nuclear Power Station, Unit 1 
Safety evaluation in support D F Amend 41 to License DPR-39 
& Amend 3B to License DPR-4B. 
Office of Nuclear Reactor Regulation. 79/01/16. 3pp. 

79030I02B1 DOCKET SO-295 Zion Nuclear Power Station, Unit 1 
I; 1 " issuance of Amend 41 to DPfi-39 & Amend 3B to 

s reduce mai allowable presaurijer heatup rate. 

Operating Reactors Branch 1. 79/01/10. 2pp, 

7902200385 DOCKET 50-395 Zion Nuclear Power Station, Unit 1 
As followup to NRC 701115 request for submittal of OFfnite 
Dose Calculation Manual for approval, Forwards guidelines for 
general contents cf manual. 

79/01/ia " Spp ABBiStant D* 1 *"*" *r Engineers t Projects. 

7902010150 DOCKET 50-295 Zion Nuclear Power Station, Unit 1 
Refers to 790110 Itr to NRC, providing ECCS reanalysU 
results. Requests author i lat ion to remove aiial power 
distribution monitoring sus surveillance for Unit 1 base 
load operation. 
REED.C. Commonuealth Edison Co. 79/O1/24. Spp. 

7903020234 DOCKET 30-393 Zion Nuclear Power Station, Unit I 
Responds to NRC requests of 7B1114 t, 7B113B for info in 
support of util request to eipand spent fuel pool storage 
capacity, Forwards answers to questions. 
NAUGHTON, W. F. Commonwealth Edison Cn. 79/01/24. B7pp, 

7902010170 DOCKET 30-295 Zlon Nuclear Power Station, Unit 1 
Refers to 790124 Itr requesting NRC authorisation to remove 
aiial pnuer distribution monitoring sys surveillance on Unit 
1 during base load operatl on. Forwards addl info describing 
base load operation procedure 
HEED.C. Commonwealth Edison Co. 79/01/23. 3pp. 

7902060297 DOCKET SO-295 Zion Nuclear Power Station, Unit 1 
Forwards Round 4 response to NflC'request for addl Info re 
spent fuel pool storage capacity eipansl on. Provides 
ductility ratios, numerical valuon of hydrodynamic mass used 
in analysis of racks. (. info re spent fuel liner 
NAUGHTON, W. F. Commonwealth Edison Co. 79/0!/3e,. 33pp. 



DOCKETED ITEMS 



790302Q174 DOCKET 30-29-5 Z i nn Nuclear Pnuier Station. Unit 1 
Informs NFIC that reevaluat ion at ECCS called for In 7804^1 
order is completei approp riate license amend !. Tech Spec 
change is being prepared . Request 5 NRC authoriie base loading 
UI/D ailal power distribution monitoring sys 
REED, C. Commonwealth Ed iaon CD. 79/01/29. 3pp. 

7902130191 DOCKST SO-29S Zion Nuclear Pouer Station, Unit 1 
Forwards proposed Tech Spec changes to ton form to ECCS 
reanalyuia t, revised LOCrt analysis for mod of accumulator 
voli to appropriate 1 eve 1 9 Amend Is combined Class 3 [< 1 
amend. Appropriate; fee remittance end. 
REED, C. Commonwealth Edison Co. 79/O2/O2. 90pp. 



7102070073 DOCKET 50-295 Zion Nuclear Pouoi- Sil.il i an. Unit 
IE Snsp Rept 3O-395/7B-23 on 7B1003-05 t. 11OB-O 1 ; No 
noncomp J ianc e noted Major areas ins pected . rev i e-uj nf 
Inservice in&p program !. procedures i obaur vat i on n-T aart 
work Bctivi tins, data TOVIDU !, evaluation 

KEY, W. J. , DANIELSDN.D H. Region 3. thitaifo, Hc.ictor 

Construction I. Engineering] Support Branch Tt/OMO-H 

7903260391 DOCKET 30-393 Zion Nuclear Power Station, Unit 1 
Forwards "Ineervice Inop n e pt" performed bij West i nghouac 
Electric Corp on 760923-1037. IncSudea Dinners' data ropt !- 
Class 1 E, II components t, piping info. 
WANDKE.N. E. Commonwealth Edison Co. 79/01/17 E2pp 



7902260469 DOCKET BO-295 Zion Nuclear Pouior Station. Unit 1 
Requests add! info re leakage/seepage of spent fuel basin t. 
copies of relevant Commonweal th Edison/MRC correspondence. 
QUIOO, C. Pollution Environmental Problems. 79/O2/02. Ip. 

790213G380 DOCKET 30-29S Zion Nuclear Power Station, Unit 1 
Forwards revised pages to proposed Tech Spots sutjini tted to 
clarify base load mods of operation. 
REED-i C. Commonwealth Edison Co. 79/D2/O9. 3pp. 

7903H6O421 DOCKET SO-293 Zion Nuclear Pawor Station, Unit 1 
Forwards 76O524 memo From Region 3 describing containment 
purging at fac i I i ty, f OP conaidarat ion in re-review of 
venting b purging of PUR !. DHR containments during normal 
operation. 
BEYTHIT,K,V. Region 4, Dallas, Office of the Director. 7 



7902120054 DOCKET 30-295 Zion Nuclear F'ouior Station, Unit 1 
Forworda IE Info Notice 79-O1. "Berg en-P,i tersun Hydraulic 
Shock A Biuag Arrnstnrs (HSSft) 11 . 

KEPPLEK, J. 8. (legion 3. Chicn S o, Office of the CMrectur 

4pp. 



7902210220 DOCKET 50-995 Zion Nuclear POU.PT Station, Unit I 
ForumnfB IE Dullottn 79-O 1 . "Environ Qualification of Cla! 
IE Equipment. " W/list of il systematic evaluation (jrogi-nm 
plants fc-r ujhlch no actlom is required. 
KEPPLER.J.Q. Rogion 3, Chtcaou, Qffice o.F the Director 



79022702SH DOCKET 3O-H95 Zidn Nuclear Power Station, Unit I 
Forwards IE Info Notice 79-03, "Limit nraiit Valve Otiarnd 
Limit Switch Lubricant. " 
KEPPLER.J.G. Region 3, Chicago, Office of thu Directnr 7'>MS/m 



79O3H6O426 DOCKET 30-2-99 Zian Nuclear Pouer Station, Unit 1 
Discusses util's study of containment purging through 
isolation valves. W/encl proposed IE circular for 
distribution to licensees 

KNdPjR.C. Region 3, Chicago, Office of the Director. 76/09/24 

4pp. 

7902360420 DOCKET 3O-295 Zion Nuclear Power Station, Unit I 
Formards LER 30-395/76-33. 
BITELiJ. 3. Commonweal th Edison Co, 7d/05/I4, Ip. 

790S2A0434 DOCKET SO-295 Zion Nuclear Pouiar Station. Unit 1 
LER 90-293/76-aS ON 760504; review of containment pursing 
incicatcd that if contalnmunt purge Isolation valves 
WHTfl open at start of LQCA, poat-LD'CA containment pressure 
uiautd b> reduced signif icantlij. 
LENTINE.F.O. Cammonuiea tth Edison Co, 7b/O5/14. 2pp, 

79022O0037 DOCKET 3O-299 Zion Muelear Pomer Station. Unit 1 
Provides info re requested license amend to change rod bou 
penaltg curve (. effective full pouier IIOUTE clad collapse 
limits. Tch Spat mods end which reflect limited scope of 
NRC review. 
REED.C. Commonwealth Ediaon Co. 79/02/13. 4pp, 

790227023S DOCKET 30-393 Zion Nuclear Pauipr Station. Unit 1 
Requests amend to Tech Specs App A for Licenses DPH-39 b 
DPR-4B. Proposod amend b Offsite Dose Calculation Manual 
incl. 
flEED.C. Commonwealth Edison Co. 79/02/16. 91pp. 

790327OS41 DOCKET 30-295 Zion Nuclear Pouior Station, Unit 1 
Offiite Dose Calculation Manual. 
* Commonwealth Edison Co. 79/03/B7. 193pp. 



7902130170 DOCKET 30-393 Zion Mudi-ar Power Station. Unit I 
Forwards "Operational Environ Maul taring in Lafco MI noor 
lion Station," July-g Ep t l97D.ro Impact of deletion of 
thermal limit* at facility, 
WANDKE, N. Commonmoal th Edison Co. 7<?/01/afl, |p. 

7-902130173 DOCKET 50-H9!) zion Nuclear Power motion, Unit 1 
"Operational Environ Monitoring In Lako HI near Zion 
Station" Julg-Gupt 78, a suppl re fl t. Cone Lud on that dclo t inn 
of thermal limits has no meanurolile cFfectn an biotii !, r.n 
chemical uiater quflllty. 

CZAJKOWBK1.0. P. , ARNEaON,R, D. Haiolton Env i ronra*ntal tl c i it n c c i. 
Corp, 70/09/3O. 111pp. 

7903130095 DOCKET &O-295 Zion Nuclear Power Statum. Unit I 
Forwards montlilij opcratin-s rept for Jan 1979. 
WANDKE, N. E. Coramunwea 1 tli Eilimin Cn 79/02/OH l|i 

7902130C-H7 DOCKET 50-295 2 i on Nucleor I'ouor QtJltlon. Unit 1 
Monthly operating r-ept fnr Jan 1979. 
JEFFERB, J. Commonwealth Ediaon Co, 79/OD/On 11pp. 

79020001?^ DOCKET 50-295 Z t on Nuclinr 1'uuer iitatl.m, Unit 1 
Forwards LER 7B-14fl/03L-O. 
MANDKEiN. E:. Commonuiefl I th Edition Co. 79/01/11 1(> 

7702000300 DOCKET HO-295 Zion Nuc I enr Pnwcr Station. Unit 1 
LER 70-144/03L-0 on 780923: g onei-fttor 1NM-441P oulnut out 11 F 
toleraneei low 2. 5X. Caused by instrument drift ci.RUUlng in 
nontoleirnnco of function generator Model lin.Mo.lel 
recalibrated It system returned to normal. 
CAMPBELL, J. Commonweal tti Ediaon Co. 79/01/11 IP 



7<902a604i3 DOCKET 30-299 Zion Nuclear Pouier Btfltion, Unit 1 
Foruiard requested Teh Spec change t, aupportino 
documentation for mod of spent fuel storage racks. 
REEDjC. Commonuea 1 th Edison Co, 79/03/H3. 20pp. 

7908060400 DOCKET SO-295 Zion Nuclear Pouier Station, Unit 1 
Forwards IE Insp Repts 30-H95/7G-21 nn 700721 , 1003, O<1, O6, 10 
t< 11, No noncomp Hants noted. 

HEIHHMAN, fi. F. Rogion 3, Chicago, Reactor Construction tc 

Engineering Support Branch. 79/01/04. 2pp. 

790BOA0403 DOCKET 50-29S Zion NuiUar Pouior Station, Unit 1 
IE Imp flspt 30-295/7B-21 on 780931,1003,01,06,10 8, 11. No 
noncompliance noted. Major areas in*pec ted: 1 icensee 
surveillance It testing for safety-related snubbers 
Y1N.1.T., DAN1ELSON, D. H. Region 3. Chicago, Reactor 

Construction tt Engineering Support Branch. 77/01/04. Spp. 

7902070070 DOCKET 50-293 Zi Dn NucUar Power Btfltion, Unit 1 
Forwards IE Insp Rept SO-29B/7B-3S on 7B1003-O5 !, 110B-09 
No noncompltance noted. 

HE.I8MMrtN,R.F negionS, Chicago, Reactor Construction t, 

Enginaering Support DrancN, 79/01/05, 3pp. 



790E080201 DOCKET 30-S95 lion Nuclear Power Qtoticm, Unit 1 
Forwarda LER 7B-Q37/03X- 1 
WANDKE.N.E, Commnnuiiifll th Edison Co. 79/01/11. ] p . 

790aOG0210 DOCKET 30-S95 Zlon Nucl 00 v Power Bt^tiniN Unit 1 
LEfl 7a-OS7/03X-l on 760403; steam flow channel 1FBHS f,illi>J 
low due to plu S gin D of high side eensinQ of tranhmilter 
while tea ling valve steam leolt. Waive was replaced 
BrtNAa, E. S, Cnramonueal th Ed icon Co, 79/O1 /] 1 , 1F> 

790BOB0307 DOCKET SO-39B Zton Nuc ler Power Sbnthm, Unit 1 
Forwards LER 7O-14O/O3L-0. 
UANDKE, N. E. ComiJioniuoo 1 th Eniaon Co. 79/01/11 In. 

7902080211 DOCKET 50-21S Zion Nucleor Powar Station, Ui.it 1 
^ !" 3L ~ " ^'227: steam gonpratar (,r B3 r,uro channel 
1P-516 pegged high anvoral time s. Caused by detuneil 
oscillator in transmitter model 30Er 101 IDCXA. Due i lUttir 
replaced 6 sijs roturficiT to normal. 
CAMPBELL, J. Cornnonuieal tli Eiftson Co. V9/OI/U. ( p 

790SOB0193 DOCKET 50-B93 Zion hfuclear Poujer Station, Unit 1 
Forwards LER 7B-138/03L-0. 
WANDKE.N.E, Commonwealth Edison Co. 79/01/17. Ip 



60 



DOCKETED ITEMS 



7903090197 DOCKET 50-295 Zion Nuclear Power Station, Unit 1 
LER 7B-138/03L-0 on 701234: dur ing normal operation component 
coaling liquid radiation monitor 1RE-0017 failed low & ujas 
taken out of svc . Cause was defective high voltage poiuer 
supply. 
OST, F. Commonwealth Edison Co. 77/01/22. Ip 



79Q20S0245 DOCKET 50-295 Zion Nuclear Pou 
Forwards LER 7B- 139/03L-0. 
HANDKE.N E. Commonwealth Edison Co 79/O1/17 



Station, Unit 1 



7903360303 DOCKET 50-296 Browns Ferry Nuclear Pouier Station. 
Forwards Endorsement 39 to MALEU Policy MF-66. 
DUCK. J. R. Marsh k McLennan, Inc. 79/O2/19. 2PP, 



Unit 3 



790314021B DOCKET 50-396 Browns Ferry Nuclear Power Station, Unit 3 
Forwards binders t sets of divider tabs for use tu/NEDO-21B8B 
"Nark 1 Containment Program Load Definition Rept. " 
90DON.L.J. General Electric Co.,Nuclear Energy Products Div 
79/01/09. Hop. 



7902QSQ34B DOCKET 30-395 Zion Nuclear Power Station, Unit 1 
LER 7a-139/O3L-0 on 781226; during monthly performance test 
on containment spray jiumji 1C, water hose on closed cooling 
sys of diesel engine broke Cooling water hose uas dofecti\ 
became brittle from age & thermal cycling. 
BRAUCZAK.A. T. Commonwealth Edison Co 79/01/33. IP 



790OBQ326 DOCKET 50-395 Zion Nucli 
Forward! LEfi 7B-130/-99X-0. 
WAMDKE.N.E. Commonwealth Edison 



Power Station, Unit 1 
. 79/01/23. Ip. 



7903080331 DOCKET 50-295 Zioti Nuclear Power Station, Unit 1 
LER 7B-130/99X-0 on 7B1205: two safety injections ocurred 
from false steam pressure differential signal s. Fal BE signals 
caused by shocks from water hammers. 
HEISS. J. F Commonwealth Edlaon Co. 79/01/22. 3PP. 

7902080333 DQCKET 50-395 Zion Nuclear Power Station. Unit 1 
Forwards LE 77-003/O1T-0 
WANDKE, N. E. Commonwealth Edison Co. 79/01/33. Ip. 



79020Q023B DOCKET 30-295 Zion Nuclear Power Station, Unit 1 
LER 79-OO3/01T-0 on 790109: Uestinghnuse results of Feb 197B 
ECCS model analysis determined that FQ limit should bo 1.86 
rather tfian the currant limit of 3. 02. Plant operations 
modified to adhere to new limit. 

n. Commonwealth Edison Co. 79/01/33. 2PP, 



7703360368 DOCKET SO-295 Z i on Nuclear Power Station, Unit I 
Forwards LEU 79-OQ2/03L-0. 
WANDXE.N.E. Commonwealth Edison Co. 79/02/07. io. 



79022603B9 DOCKET 50-293 Zion Nuclear Power Station. Unit I 
LEH 79-002/03L-0 on 790108. blower of 1RE-001 1. containment 
vent particulate monitor, tripped. Caused by fuse failure In 
control room monitor. 
O5T,F. CommnnLieal th Edison Co. 79/03/07. IP. 

79Q23&0469 DQCKET 50-295 Zion Nuclear Power Station, Unit 1 
Forwards LER 79-O04/03L-O. 
UANDKE.N. E Commonwealth Edison Co, 79/02/09. Ip. 

7903360473 DOCKET 50-295 Zion Nuclear Power Station, Unit 1 
LER 79-OQ1/03L-0 on 7901 12: during normal operation, inverter 
114 tripped tc could not be reset. Caused by defective 2. 5KVA 
inverter section SOLA transformer t. loose contact on DC feed 
breaker. 
RDTKERMEU, R. R. Commonweal th Edison Co. 79/02/09, Spp. 

7902230110 DOCKET 50-295 Zion Nuclear Power Station, Unit 1 
Forwards LER 79-O09/03L-Q. 
WANDKE.N.E. Commonwealth Edison Co. 79/02/14. Ip. 

7VOS330114 DOCKET 50-295 Zion Nuclear Power Station, Unit 1 
LER 79-007/03L-0 on 780930: quarterly overage gaseous release 
rats uas tuice annual objective but less than Tech Spec man, 
Caused by reactor headvont during refueling !. conservative 
quantification methods. 
GUflUNATHAN, S Commonwealth Edison Co. 79/03/14. Ip. 

7902260363 DOCKET 50-295 Zion Nuclear Power Station, Unit 1 
Forwards LER 79-005/03L-0. 
HANDKE.N. E. Commonwealth Edison Co. 79/02/H. Ip. 

7903360367 DOCKET 50-293 Ziun Nuclear Power Btation, Unit 1 
LER 79-005/03L-0 on 79O1 15: penetration S BS Zone 3 pressure 
fell belou 41 pslo t, n,ne flow pegged high. Caused by leak in 
o^D r D Ur S! v f lvcB Pratt 4S lth butterfly valves !, model 
KIAB PS offset disc during cold weather 
UGOLIHI. D, Commonwealth Eifison Co. 79/02/14. 4pp. 

7903320119 DOCKET 50-S96 Drouns Ferry Nuclear Pouer Station. Unit 3 
Informs that THADOC Pamphlet 350-30, "Interservic e Procedures 
for Instructional Sys Development" referenced in NlffiEO-0219 
13 available in microfiche form Prom NHC. 
BEBftW.U, J. Division of Document Control, 79/01/09 2pp 



*-*"'*> FTPU. Nuclear Power Station. Unit 3 
ement 46 r B change, in subscribing companies 
'wt- Utility endorsement to NEL1A Policy 



79022803B5 DOCKET 50-296 Browns Ferry Nuclear Power Station, Unit 3 
As followup to NRC 7B1115 request for submlttal of Dffsite 
Dose Calculation Manual for approval, forwards guidelines for 
general contents of manual. 

QR1MEB.B.K. Assistant Director for Engineers t, Proiects 

79/01/18. Spp. 

7902020263 DOCKET 50-396 Browns Ferry Nuclear Power Station, Unit 3 
Forwards further revisions to pump !< valve testing program 
based on review of ASME Section XI requirements t, facility 
design. 
OILLELAND, J. E. Tennessee Valley Authority. 79/01/29, 3pp. 

7902020265 DOCKET 50-276 Browns Ferry Nuclear Power Station, Unit 3 
Discusses controversy re use of REDY or DDYN transient 
codes. Util plans to use new ODYN codej assumes theu have NRC 
concurrence to do so, Requests to be informed by 790205 if 
assumption is erroneous, 
BILLELAND, J. E. Tennessee Valley Authority. 79/01/29. Ip, 

7902220357 DOCKET 50-296 Drowns Ferry Nuclear Power Station, Unit 3 
Responds to 790111 request for review of paper "Vent 
Clearing During Simulated U1CA in a Mark 1 GWR Pressure- 
Suppression 9ys. " Recommends paper be accepted for 
publication. 
GRIMES, C. Plant Systems Branch. 79/01/31. 2pp. 

79020B0195 DOCKET 50-296 Drowns Ferry Nuclear Power Station, Unit 3 
Submits Dec 197S program activity review, comprised of info 
from selected sections of monthly rep t, uj/section on contract 
tc billing status removed. Li sts meetings held fc provides 
task-by-task activity summary. 

SDDCN.L. J. General Electric Co. .Nuclear Energy Products Div 
79/03/05. 10pp. 

79022B0314 DOCKET 50-296 Drowns Ferry Nuclear Pouier Station, Unit 3 
Forwards topcial repts re lattice physics methods t, core 
simulations, 
OILLELAND, J. E. Tennessee Valley Authority. 79/02/20. 4pp. 

7902280320 DOCKET 5O-296 Drowns Ferry Nuclear Power Station, Unit 3 
"Verification of TVA Steady-State BUR Physics Methods " 
Tennessee Valley Authority. TVA-TR79-Q1. 79/01/31. 150pp. 

7902280330 DOCKET 50-296 Browns Ferry Nuclear Power Station. Unit 3 
"Methods for Lattice Physics Analysis of LWR's. " 
DARNELL,Q.L. , DEU, T. D, . PERRY.G.W. Tennessee Valley Authority, 
TVA-TR7B-02. 7B/04/15. 150pp. 

790236033? DOCKET 50-296 Browns f-erry Nuclear Pouer Station, Unit 3 
"Throe-Dimensional LWR Core Simulation Methods." 
FDHKNER.S.L. , MERIWETHER, 0, H, . DEU. T. D. Tennessee Valley 
Authority. TVA-TR78-03. 78/06/01. SOpp. 

79022B0316 DOCKET 50-296 Drowns Ferry Nuclear Power Btation, Unit 3 
Act receipt of NRC 7B0711 request for proposed Tech Specs 
for facility which would incorporate 10CFR50. Requests 
eitenslon of time until 7907O1 for submlttal. 
GILLELAND, J. E. Tennessee Valley Authority. 79/O2/B3. Ip. 

7902370143 DOCKET 30-296 Browns Ferry Nuclear Pouier Station, Unit 3 
Forwards IE 'Insp Repts 50-259/7B-31, 30-360/78-36 & 
50-296/78-34. No noncomp 1 iance noted. 

LONO.F.J. Region 3, Atlanta. Reactor Operations Nuclear Support 

Branch, 79/01/04. 2pp. 

7902370134 DOCKET 50r296 Browns Ferry Nuclear Power Station, Unit 3 
IE Insp Repts 50-259/78-31,80-260/78-36 It 50-296/7B-34 !< on 
781212-14. No noncompliance noted. Major areas inspected; 
operator requa li f ication training program & formal training 
!( retraining, program for non-licensed plant personnel. 
BRADFORD, W, H. . TAYLOR, P. A., KELLOQO.P.J. Region 3, Atlanta, 

Reactor Operations Nuclear Support Branch. 79/01/03. 4pp. 

79032B045B DOCKET 50-296 BrOluns Perry Nuclear Power Station, Unit 3 
Forwards IE Insp Repts 50-259/78-36 i 30-296/79-36 on 
7B1226-29. No noncomp 1 iance noted, 

LONO.F.J. Region 2. Atlanta. Reactor Operations Nuclear Support 

Branch. 79/01/12. Bpp. 



FIELDER, 0. Marsh t McLennan, Inc. 79/02/06. 



2PP. 



DOCKETED ITEMS 



61 



7902280463 DOCKET SO -296 Browns Ferry Nut 1 ear Pouer Station, Unit 
IE In*p Repts 30-299/78-36 & 30-296/7B-36 on 781226-39, No 
noncomp 1 lance noted. Major areas Inspected : records of post 
refueling testing activities conducted on Unit 3 during Dct 
(. Nov 197B. 

JULIAN- C,, FORD.E., MARTIN-R.D. Region 2. Atlanta, Reactor 
Operations Nuclear Support Branch. 79/01/11. 5pp. 

790H12OOSO DOCKET 30-296 Browns Ferrg Nuclear Power Station. Unit 3 
Forwards IE Info Notice 79-O1 , "Bergen-Paterson Hydraulic 
Shock b Sway Arrestors (HBSA)," 

O'REILLY, J.P. Region 2. Atlanta, Office of the Director. 
79/02/OH. app. 

79D213003B DOCKET 90-296 Browns Ferry Nuclear Power Station, Unit 3 
Forward* IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment. " 

O'REILLY, J, P. Region 2, Atlanta. Office of the Director. 
79/03/03. app. 

7902210164 DOCKET 50-296 Browna Parry Nuclear Power Station, Unit 3 
Forwards IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment." W/list of 11 systematic evaluation program 
plants for which no action is required. 

O'RGILLV, J. P. Region S. Atlanta, Office of the Director. 
79/02/OB. 2pp. 

7902230002 DOCKET 30-296 Browns Ferry Nuclear Power Station, Unit 3 
Ac l< receipt of 790131 Itr informing NRC af steps taken to 
correct violation* noted in IE Insp Repts 30-239/7B-34, 
SO-360/7S-37 It 30-296/7B-3S. 
HENNA. H. B. Region S, Atlanta, Safeguards Branch. 79/02/oa. 1 

7902230005 DOCKET 30-396 Browns Ferry Nuclear Power Station, Unit 
Responds to NRC 79010B Itr re violations noted in IE Insp 
Repts 30-259/7S-34. 30-260/7B-37 b 5Q-296/7B-33. Correc tl ve 
actions: training sessions conducted rsemphaslng security 
employees' responslbl it !. 
QILLELAND. J. E. Tennessee Valley Authority, 79/01/31. 2pp. 

7902230007 DOCKET 30-296 Browns Ferry Nuclear Power Station, Unit 
Forwards IE Insp Rept 30-239/78-34.30-260/78-37 t. 
80-296/7B-3S on 7S121B-19 d notice -of violation. 
KENNA.U. H. Region 2, Atlanta, Safeguards Branch. 79/01 /OB 



7902S30008 DOCKET 30-396 Broun 5 Ferry Nuclear Power Station. 
Notice of violation from insp on 7B121B-19. 
* Re Dion 2, Atlanta, Office of the Director, 79/01/OB. 



2pp. 



7902230009 DOCKET BO-296 Brawns Ferry Nuclear Power Station. Unit 3 
IE Insp Rept 50-239/7B-34, 30-260/7B-37 & 50-396/7B-33 on 
7B121S-19. Noncompliancn noted: failure to search personnel 
tt hand-carried package. 

BEBECKER.K. H. ,, FUCHKO, J. M. , OILLESPIE, F. P. Region 2, Atlanta, 
Safeguards Branch. 79/01/OB. 3pp. 

79022B0134 DOCKET 30-296 Browns Ferry Nuclear Pouier Station, Unit 3 
Forwards IE Info Notice 79-03, "Limi torque Valve Geared 
Limit Switch Lubricant. " 

D'HEILLY, J.P. Region 2, Atlanta, Office of the Director. 
79/02/09. 2PP. 

79022B0341 DOCKET 30-396 Browns Ferry Nuclear Power Station, Unit 3 
Responds to 79Q20B Itr which forwarded IE Bulletin 79-01, 
"Environ Qualifications of Class IE Equipment," Eiplains 
usage of stem-mounted limit switches. Bel laves safe operation 
1* not compromised In any way. 
OILLELAND, J. E. Tennessee Valley Authority. 79/03/33. lp. 

7902-130093 DOCKET 30-396 Brouins Ferry Nuclear Power Station, Unit 3 
Forwards monthly operating rapt for Jn 1979. 
DEWEASE.J.Q. Tennessee Valley Authority. 79/02/09. lp, 

7908130093 DOCKET 30-296 Browns Fsrry Nuclear Power Station, Unit 3 
Monthly operating rept for Jan 1979. 
DEHEABE.J. Tennessee Valley Authority. 79/01/31. 35pp. 

7902120160 DOCKET 5O-296 Browns Ferry Nuclear Power Station. Unit 3 

Forwards LER 79-001/03L-0. 

FOX.H.S. Tennessee Valley Authority. 79/02/03. lp. 

7902120166 DOCKET 90-296 Browns Ferry Nuclear Power Station, Unit 3 
LER 79-001/Q3L-0 on 7901 11 : switch on LIB-3-36B failed to 
trip reactor rec irculation pump motor generator. Caused by 
mlsad jutted a witch on Yaruay Model 441BCE. Switch 
recalibr & tested satisfactorily. 
* Tennessee Valley Authority. 79/01/30. Bpp. 

7902140114 DOCKET 30-296 Browns Ferry Nuclear Power Station, Unit 3 
Forwards LER 79-OOa/03L-O. 
FOX,H.9. Tennassee Valley Authority. 79/02/06. lp. 



7903140117 DOCKET 50-396 Browns Ferrij Nuclear Pouer Station, Unit 3 
LER 79-OQ2/03L-0 on 7901 17: during maintenance of reset 
suit tch, short circuit damaged power supply t< sensor circuit 
board, rendering filed spray automatic initiation circuit for 
fire protection Inoperable 
* Tennessee Valley Authority. 79/02/06 2pp. 

7902320119 DOCKET 50-298 Conpar Nuclear Btation 

Informs that TRADQC Pamphlet 390-30, "Intorsarvice Procedures 
for Instructional Sys Development" referenced In NUHES-O219 
is available in microfiche form from NRC, 
BEBAU.W.J. Division of Document Control. 79/01/09. 2pp. 

79022BO239 DOCKET BD-29B Cooper Nuclear Station 

Forwards binders to contain physical security p Ian, Revis ion 

9, submitted 790122. Sent under separate cover. 

P1LANT.J.M. Nebraska Public Pouier District. 79/02/36, lp. 

7902060266 DOCKET 50-396 Cooper Nuclear Station 

Forwards Endorsement 43 to NELIA Policy NF-200 d Endorsement 

34 to HAELU Policy MF-7O for calendar year 1979. 

PILANTiJ.M, Nebraska Public Power District. 79/01/31. 3pp. 

7902260397 DOCKET 30-298 Cooper Nuclear Station 
Submits info From Region 4 on BUR purging. 

MADSEN-Q.L. Rug ion 4, Dallas, Reactor Operations Nuclear Support 

Branch. 79/03/26. 3pp. 

790214021B DOCKET 50-296 Cooper Nuclear Station 

Forwards binders !< sets of divider tabs for USD u/NE[)fl-21BBB 
"Mark 1 Containment Program Load Definition Rept." 
SOBDN.L. J. General Electric Co. .Nuclear Energy Products Dlv 
79/01/OB. Bpp, 

7902280385 DOCKET 90-293 Cooper Nuclear Btation 

As follouup to NRC 7B1115 request for submittal of Offsite 
Dose Calculation Manual for approval, forwards guidelines for 
general contents of manual. 

GRIMES. B. K. Assistant Director for Engineers (< Projects. 

79/01/18. 3pp. 

790202023S DOCKET 30-290 Cooper Nuclear Btation 

Forwards proposed minor Tech Spec changes, for License 

DPR-46, re radiological procedures t< reactor startups for 

training. 

PILANTiJ.M. Nebraska Public Power District. 79/01/30. 9pp. 

7902090350 DOCKET 50-293 Cooper Nuclear Station 

Requests operating license bo reviled to allow operation 
following fourth refueling of reactor. Forwards propoied 
changes to Tech Specs. *4, 000. 00 check, & OE rept NEDO-S4I70, 
"Suppl Reload Licensing Bubmiltal, " 
PILANTiJ.M, Nebraska Public Power District. 79/01/31. 27pp. 

7902090359 DOCKET 30-298 Cooper Nuclear Station 

"Suppl Reload Licensing Submittal for Cooper Nuclear Station 
Unit 1, Reload 4, " 

RASH, J, L. , ENQEL.R.E. General Electric Co, .Nuclear Energy Products 
Div. NEDQ-24170. 70/12/31. 2flpp. 



7902220297 DOCKET 30-298 Cooper Nuclear Station 

Responds to 790111 request for review of paper "Vent 
Clearing Durlnn Simulated LOCA in a Mark I BWR Pressure- 
Suppression Sys." Recommends paper be accepted for 
publication. 
CRIMES, C. Plant Systems Branch, 79/01/31. 2pp, 



79020S0199 DOCKET 50-290 Cooper Nuclear Station 

Submits Dec 1978 program activity revl eu, comprised of Into 
from selected sections of monthly rept, w/sec tlon on contract 
ti billing status removed. Li sts meetingi held E> provides 
task-by-task activity summary. 

EOBON, L. d. General Electric Co. .Nuclear Energy Products Div. 
79/02/03. 10pp. 



790S280Q04 DOCKET BO -296 Cooper Nuclear Station 

Requests Inclusion of OE rept NEDG-245a3, "Plant Unique 
Analysis Application Guide" in docket. since rept will be 
used to support containment evaluation program. 
P1LANT.J.H. Nebraska Public Power District. 79/02/26. lp. 



7902010300 DOCKET 50-B9B Cooper Nuclear Station 

Forwards IE Circular 79-02, "Failure of 120 Volt Vital AC 

Power Supplies. " 

BEYFRIT.K.V. Region 4, Dallas, Office of the Director. 79/01/16. 

7pp. 

79032B0144 DOCKET 30-293 Cooper Nuclear Station 

Forwards 1G Info Notice 79-01, "Bergen-Paterson Hydraulic 

Shock & Sway Arresters (HBSAK " 

BEYFRIT.K.V. Reeion 4, Dallas. Office of the Director. 79/02/02. 

lp. 



52 

79022B0454 DOCKET 50-293 Cooper Nuclear Station 

Forwards IE Bulletin. 79-01, "Environ Qualification of Cle 

IE Equipment. W/list of 11 systematic evaluation progran 

plants for uh 1 c h no action is required 

5EYFRIT.K. V Region 1, Dallas, Office of the Director. 

IP 



79035B001B DDCMET 50-29B Cooper Nuclear Station 

Forwards EE Info Notice 79-03. "Llmitnrque Waive Geared 

Limit Suited Lutricant " ,, 

SEVFRIT.K. V. Region 1, Dallas. Office of the Director. 79/03/09 

IP 



DOCKETED ITEMS 



7902260101 DOCKET 50-3O1 Point Beach Nuclear Plant, Unit 2 
Forwards IE Insp Repts 5O-266/7B-24 t, 50-301/70-35 on 
791311-13. No noncnmpl iance noted. 

F1QRELLI.Q. Region 3, Chicago, Reactor Operations Nuclear Support 

Branch. 79/01/12. 2pp. 

7902260104 DOCKET 50-301 Point Beach Nuclear Plant, Unit 2 
IE Insp Repts 50-266/78-94 !( 50-3O1 /7B-35 on 7B1211-13. No 
noncompliance noted, Major areas inspec ted : plant operational , 

cleaniness, review t, aud it, survel 1 lance testing. nonroutine 
fol louup, IE circular fol lauiup, tt independont insp, 
CHOULES,N. C. , WARNICK.R.F, Region 3. Chicago' Reactor 

Operations Nuclear Support Branch. 79/01/OB. 6pp, 



79O22B0291 DOCKET 5Q-29B Cooper Nuclear Station 

Informs of status of Class IE equipment per IE Bulletin 
79-01, "Environ dual i f ication of Class IE Equipment. " 
Problem twitches mill be changed during neit refueling 
outage in Apr 1979. 
FILANT.J. M. Nebraska Public Pouer District 79/02/21. 3pp. 



7902150466 DOCKET 30-301 Point Beach Nuclear Plant, Unit 3 
Ack receipt of 790116 Itr informing NHC of steps taken to 
correct violation identified in NfiC 7B1226 Itr. 
KEPPLER, J. 0. Region 3, Chicago, Office of the Director. 

Ip. 



79/01/30. 



7902090261 DOCKET 50-a?B Cooper Nuclear Station 
Forwards monthly operating rcpt for Jan 1979. 
LESSOR, L. C. Nebraska Public Pouier District. 79/03/02 



7902Q902M DOCKET SO-S9S Cooper Nuclear Station 
Monthly operating rept for Jan 1979. 
BORER, P. J. Nebraska Public Power District. 7 



5pp. 



7902220119 DOCKET 30-301 Point Beach Nuclear Plant. Unit 3 

Informs that THADDC Pamphlet 350-30, "Intereervlce Procedures 
for Instructional Sys Development" referenced in NUREQ-0219 
is available in microfiche form from NRC. 
BE8AW,tt J. Division of Document Control 79/01/09. 2pp. 

79O203QO62 DOCKET 50-301 Point Beach Nuclear Plant, Unit S 
Agreement between Intervenor, UI Electric Power Co & NRC. 
Intervenor withdraws from spent Fuel pool proceed ing. Uti 1 
uiill provide them u/ environ data semiannual It; f< copies of 
all LEfls. NRC will insp pool. 

BAST,3.A. Lakeshore Citiiens for S.ifa Energy. CHURCHILL, B. W. 
Wisconsin Electric Power Co. EARTH, C. A, Office of the E.Bcutlve 
Legal Director. 7B/1H/I3. 5pp. 

7902090346 DOCKET 50-3O1 Point Doach Nuclnar Plant, Unit 2 
Forwards Endorsement 36 to NELIA Policy NF-17B t< Endorsement 
47 tn HAELU Policy MF-33 eitending coverage for calendar 
year 197-9. 
DUNDAS.U. J. Wisconsin Electric Power Co. 79/02/O3. 3pp. 



7902090295 DOCKET 50-30-1 Point Beach Nuclear Plant, Unil 2 
Forwards Endorsement 3 to NELIA flinders EB-19 t. ED-19, !< 
Endorsement 3 to MAEtU Binders XB-1B !, XB-19 extending 
seconaarij financial protection for year 1979. 
DUNDAS.H. J. Wisconsin Electric Power Co. 79/02/05, 9pp. 



7902020239 DOCKET 50-301 Point Beach Nuclear Plant, Unit 2 
Forwards updates & revisions to previously submitted info 
re applications for amends to Licenses OPR-24 !. DPIi-27. 
Amends seek moil of spent fuel storage fc bundling facilities. 
BURSTER. S. Wisconsin Electric Poiuer Co. 79/01/29. 7pp. 



7902260233 DOCKET 50-301 Point Beach Nuclear Plant. Unit 2 
Forwards summary of PUR purging fc venting Bioerlencos. 
5EYFHIT.K. V. Region 4, Dallas. Office of the Director. 

4pp. 



79022803B3 DDCKET 30-3O1 Point Beach Nuclear Plant, Unit 2 
As fnllouuip to HRC 761115 request for submittal of Qffsltc 
Dose Calculation Manual for approval, forwards ouldDlines fnr 
general contents of manual. 

GRIMES, B. K, Assistant Director for Engineers t, Projects. 

79/01/1B. 5pp. 



7903260596 D-OCKET SO-3O1 Point Geach Nuclear Plant, Unit 3 
Act receipt of 791127 request for Tech Spec change relating 
to inservice insp of safety class components, Amend request 
cstegoriied as Class III Fee & requests payment. 
DIGGB.R.M. License Fee Management Branch. 79/01/29. 2pp. 



7902120110 DOCKET 50-301 Point Beach Nuclear Plant. Unit 3 
Forwards IE Info Notice 79-01, "Bernen-Pateruon Hydraulic 
Shock !. Buay Arrcstors <HS5A). 

KEPPLEO.J.G. Rogion 3. Chicago, Office of the Director, 79/03/02, 

Ip. 

770H21O204 DOCKET 5O-301 Point Death Nuclear Plant. Unit 3 
Forwards IE Bulletin 79-01. "Environ Qualification of Class 
IE Equipment," U/list oF 11 systematic evaluation program 
plants for uihich no action is required. 
KEPPLER, J. S. Region 3, Chicago, Office of the Director, 79/02/09. 



7903270371 DOCKET 5O-301 Point Beach Nuclear Plant, Unit 2 
Forwards IE Info Notice 79-O3, "Limi torque Valve Geared 
Limit Switch Lubricant. " 

KEPPLER, J. 0. Region 3. Chicago, Office of the Director. 

Ip. 



79022HOI19 DOCKET 50-303 Crystal fitver Nuclear Plant, Unit 3 
Informs that TRADOC Pamphlet 390-30, "Intersarvice Procedures 
for Instructional SUB Development" referenced in NUREO-O219 
is available in microfiche form from NHC, 
BE6AW.H. J, Division of Document Control, 79/O1/O9. 3pp. 

79022B0249 DOCKET 5Q-30H Crystal River Nuclear Plant, Unit 3 
Unable to fully implement modified amended security plan as 
installation of ncu security hard warn not comp leted. Provides 
const completion dates of remaining itemsj lists temporary 
measure. End withheld (ref IOCFRS. 790), 
BTEHAnT,U.P. Florida Power Corp. 79/02/23. Ip. 



7902120187 DOCKET 30-302 Crystal River Nuclear Plant, Unit 3 
Forwards Endorsement 33 re changes in subscribing companies 
t< In their proportionate liability endorsement to NELIA 
Policy MF-195. 
FIELDER, J. Marsh !. McLennan. Inc. 79/03/06. 2pp. 



7902330153 DOCKET 30-3O2 Crystal River Nuclsar Plant, Unit 3 
Forwards Endorsement 33 to MAELII Policy MF-91. Amends 
Condition 4 to reflect ncu pool capacity, 
DUCK.J.R. Marsh !, McLennan, Inc. 79/02/16. Spp. 



7902010116 DOCKET 30-302 Crystal River Nuclear Plant, Unit 3 
Forwards computer tape ui/meteorologu data at site For 1973. 
1977 (< 1970, X/Q's for 1979 & 1977 uere calculated by 
XOODOQ program using site specific parameters from June 1976 
App 1 rept. 
BTEHART.H, P. Florida Pouer Corp. 79/01/34. 5pp. 

7902120074 DOCKET 50-302 Crystal River Nuclear Plant, Unit 3 
Forwards Amend IB to DPR-72 ti Federal Register notice, 
F!EID,n,W, Operating Reactors Branch 4, 79/01/34. 3pp. 

790S13007B DOCKET 30-302 Crystal, fiver Nuclear Plant, Unit 3 
Amend IB to DPR-72 madtfing license to include current 
Commission-approved physical security plan effective 790223. 
REIDiR.U. Operating Reactors Dranch 4. 79/01/24. 2pp. 



79&20o0204 DOCKET 50-301 Point Beach Nuclear Plant, Unit B 
Forwards Tech Spec Change Request 54 re acceleration 
spectrum versus frequency curve for spent fuel pool in 
response to 790126 fc 790129 phono renuests. U/ent 1 graph. 
BUBSTEIMiB, Wisconsin Electric Power Co. 79/01/30. 3pp. 

7903090340 DDCKHT 50-301 Point Beach Nuclear Plant, Unit 3 
Submits mod to Tech Spec Change Request 34 re add] 
restrictions on movemant of heavy loads d operation of 
auiiliary bldg crane over spent fuel stored in fuel pool. 
BUHSTEIM, B, Wisconsin Electric Power Co. 79/OR/07. 9pp, 



7902I200BO DOCKET 50-302 Crystal River Nucloar Plant, Unit 3 
Notice of issuance of Amend 18 to DPR-72, 
REIDrR.U. Operating Reactors Branch 4. 79/01/24. 3pp, 



7903150439 DOCKET 50-303 Crystal River Nuclear Plant, Unit 3 
Notice of 790303 meeting re reactor coolant flou sensing 
line mods, 
NELBQN.C.C. Operating Reactors Droned 4, 79/01/34. Ip. 

7902010171 DOCKET 90-3QB Crystal River Nuclear Plant, Unit 3 
Submits plan for proceeding with Phase 2 re asymmetric LDCA 
load! program. Forwards rept "BfcH 177 Fuel Assembly Owners 
Group Asymmetric LOCA Loads Evaluation Program, Phase B" 
Identified content h schedule. 
STEWART, W. P. Florida Pouer Corp. 79/01/26. Spp. 



DOCKETED ITEMS 



7902010178 DOCKET SO-3O2 Crystal River Nuclear Plant, Unit 3 
"Dt.W 177 Fuel Assembly Owner's Group Asymmetric LQCA Loads 
Evaluation Program, Phase 2." Evaluatod components include, 
reactor pressure vessel. fuel assemb 1 lea, control rod drives ti 
core flooding piping. 
Florida Poiuer Corp. 7B/10/IO. 9pp. 

7902020270 DOCKET 3O-302 Crystal River Nuclear Plant, Unit 3 
Forwards responses to NRC questions on fire protection & 
cable tact results. 
STEWART, W. P. Florida Pouier Corp. 79/O1/36. 12pp. 

7903020271 DOCKET 50-302 Crystal River Nucloar Plant, Unit 3 
"Fire Retardant Cable Test, Juno-Sept 1977, HfcO Project " 
SHOOK, D. A., GAKER.K.B. Florida Powor Corp. 77/Q6/O9. 23pp. 

79020B0163 DOCKET 30-302 Crystal River Nuclear Plant, Unit 3 
Forwards data per 781222 request for addl info re proposed 
mods to include reactor coolant pump pouiar monitors. 
STEWART, W. P. Florida Power Corp. 79/01/29. 20pp. 

7902210353 DOCKET 50-302 Crystal River Nuclear Plant, Unit 3 
Requests notification of status of listed Tech Spec change 
requests submitted 1977-76. Also requests Followup rept to 
NRC review of facility impingement rept submitted 780830. 
STEWART, W.P, Florida Power Corp. 79/02/09, 2pp. 

7902190390 DOCKET 30-303 Crystal River Nuclear Plant, Unit 3 
Forwards startup rept for Facility. 
STEWART, W. P. Florida Power Corp. 79/02/12. lp. 

7902150391 DOCKET 9O-303 Crystal River Nuclear Plant. Unit 3 
"Cycle 1: Mid-Cycle Startup Rept." 
BEATTY.O.P., BAYNARD.C.Y. Florida Power Corp. 79/01/30. 95pp. 

7903130341 DOCKET SO- 302 Crystal River Nuclear Plant, Unit 3 
Submits coplus of draft Tech Specs change request to App A ti 
B of License DPR-73. Draft Tuch Specs based on NUREQ-0172, 
"Draft Radiological Effluent Tech Spec for PUR 's, Hevl slon 1. 
Oct 197B. " 
STEWART, W. P. Florida Power Corp. 79/02/13. 112pp, 

7902300OO7 DOCKET 50-302 Crystal River Nucloar Plant, Unit 3 
Forwards responses to NRC questions 17,21,24,31,66 t< 69, NRC 
request for addl info 4 h 6, It SRP Sections 21,41 & 43. 
STEWART, W, P. Florida Power Corp. 79/02/14. llpp, 

7902330266 DOCKET 30-302 Crystal River Nucloar Plant, Unit 3 
Forwards IE Insp Ropt 50-302/78-30 on 7B1211-15 t, notice of 
violation. 

SUTHERLAND, J. T. legion 2, Atlanta, Fuel Facility !, Materials 
Bafetu Branch. 79/01/09. 3pp. 

7902220268 DOCKET 50-302 Crystal River Nuclear Plant, Unit 3 
Notice of violation from. Insp on 7B1311-15. 
Region 2, Atlanta, Office of the Director, 79/01/09. lp. 

7903220271 DOCKET 50-302 Crystal River Nuclear Plant, Unit 3 
IE Imp fiept SO-302/7S-30 on 7B121 1-13. Noncomp Honce noted; 
failure to rnvieui & approve vendor liquid uiaita processing 
procedures. 

EWALD.S.C., OIBSDN.A.F. Region 2. Atlanta, Fuel Facility & 
Materials Safety Branch. 79/01/09, Bpp. 

7903130034 DOCKET 30-302 Crystal River Nuclear Plant, Unit 3 
Forwards IE Dulletln 79-01, "Environ Qualification of Class 
IE Equipment. " 

O'REILLY, J. P. Region 2, Atlanta, Office of the Director 
79/02/05. lp. 

7902310177 DOCKET 90-302 Crystal River Nuclear Plant, Unit 3 
Forward* IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment." W/list of 11 systematic evaluation program 
plants for which no action IB required. 

D'REILLYi J. P. Region 3, Atlanta. Office of the Director. 
79/02/OB. 3pp. 

7903320243 DOCKET 30-302 Crystal River Nuclear Plant, Unit 3 
Ack receipt of 790139 1 tr informing NRC of steps taken to 
correct violation noted In IE In*p Rept 50-302/78-30. 
SUTHERLAND. J. T. Region 2, Atlanta, Fuel Facility t, Materials 
Safety Branch. 79/02/oa. . lp. 

7902220231 DOCKET 30-302 Crystal River Nuclear Plant, Unit 3 
Responds to NRC 790129 ro violation noted in IE Inop Rept 
GO-302/7B-30. Corroctive actions: vendor 's actions will be 
reviewed t< full compliance mill be- achieved by 790401. 
STEWART, W. P. Florida Poioer !i Light Co. 79/02/02. 2pp, 

79022BOI01 DOCKET SO-303 Crystal River Nuclear Plant, Unit 3 
Forwards IE Info Notice 79-03, "Limi torque Valve Geared 
Limit Switch Lubricant." 

O'REILLY, J.P, Region 3, Atlanta. Office of the Director. 
79/02/09. IP. 



7902140133 DOCKET 50-303 Crystal River Nuclear Plant. Unit 3 
Forwards monthly operating rept far Jan 1979 
STEWART, W, P. Florida Power Corp 79/02/09. lp. 



7903140127 DOCKET 30-302 Crystal River Nucleai 
Monthly operating rapt fnr Jan 1979. 
KENNEDY, Fi. W. Florida Power Corp. 79/02/01 



Plant, Unit 3 
Spp. 



79020S0113 DOCKET 50-302 Crystal River Nuclear Plant, Unit 3 
Forwards LER 79-002/03L-0. 
STEWART, W. P. Florida Power Corp. 79/O1/29 lp. 

7902050115 DOCKET 50-302 Crystal River Nuclear Plant, Unit 3 
LER 79-002/03L-0 on 790102:33 ft wind direction monitor was 
inoperable. Caused by wind direction sensor bearing being 
contaminated w/cool dust. Sensor renewed thru normal 
maint. 
COOPER. J. Florida Power C 



79/O1/25. 



2pp. 



790S0301B3 DOCKET 30-303 Crys 
Forwards LER 79-003/03L-0. 
STEWART, H. P Florida Power 



tal Rlvar Nuclear Plant, Unit 3 
Corp. 79/01/29. lp 



7902050187 DOCKET 50-303 Crystal River Nucloar Plant. Unit 3 
LER 79-003/03L-D on 79O106: during Ri runback following 
turbine trip, main Feedwater block valve FHU-30 did not 
close. Caused by valve sticking on its back seat. Corrective 
action: manual cycling. 
COOPER, J. Florida Power Corp. 79/01/36. 2pp. 



79020B01S9 DOCKET 90-303 Crystal River Nuclt 
Forwards LER 79-003/01T-0. 
BTEHART.U.P. Florida Power Corp. 79/02/C 



Plant, Unit 3 



79020801D6 DOCKET 50-302 Crystal River Nuclear Plant, Unit 3 
LEfl 79-003/01T-0 on 790133: facl ] 1 ty notified that during 
accidents such as double-ended pipo rup tore, Rockwol 1 Mfg Co 
main steam isolation valve may not clam in specified time 
of 5-s due to forces on valve disc, 
COOPER. J. Florida Power Corp. 79/01/30. 2pp. 

7902120096 DOCKET 50-303 Crystal Rivor Nucloar Plant, Unit 3 
Forwards LER 79-C04/03L-0. 
BTEWART.U.P. Florida Power Corp. 79/02/Ot. lp. 

7902130098 DOCKET 30-302 Crystal River Nucloar Plant, Unit 3 
LER 79-004/03I.-0 on 790113;cablo tunnel sump pump Failed 
to start during operobility vori f ication. Haint restored sump 
pump oporflhility, Caused attributed to failure of pump 
COOPER, J, Florida Power Corp. 79/02/02. 2pp. 

7903120121 DOCKET 50-302 Crystal River Nucloar Plant, Unit 3 
Forwards LER 79-006/01T-0. 
BTEWART.H, P, Florida Powsr Corp. 79/02/06. lp. 

7902120135 DOCKET 50-302 Crystal ftiver Nuclear Plant, Unit 3 
LER 79-006/01T-Q on 790301 : figures for transient limits on 
rapid depresuurl lat ions t. high prmsuro injection teals in 
disagreement w/Cycle 2 reload rept. Tech Specs will be 
revised. 
COOPER, J. Florida Power Corp. 79/02/04. 2pp. 



79022H0040 DOCKET 50-302 Crystal River Nuclear 
Forwards LER 79-OQ7/Q3L-0. 
STEWART, W. P. Florida Power Corp. 79/09/13. 



Plant, Unit 3 
'P. 



7902230044 DOCKET 30-302 Crystal Rivar Nuclear Plant, Unit 3 
LER 79-007/03L-0 on 7901 17: reactor coolant dose equivalent 
1-131 exceeded 1. mCi. Caused by eipected transient spikea 
following reactor trip !, known leaking Fuel pins. 
COOPER, J. Fiorina Power Corp. 79/02/09, 35pp. 

7902220117 DOCKET 50-302 Crystal RivDr Nucloar Plant, Unit 3 
Forwards LER 79-OOB/03L-0, 
STEWART. W. P. Florida Pouier Corp. 79/08/14. lp. 

7902220130 DOCKET 30-302 Crystal River Nuclear Plant, Unit 3 
LER 79-OOB/03L-0 on 7901 19: RC3-OP3-DL4 light did not 
eitinouiih when test ouitch returned to off position. Caused 
by dirty contacts in relay. 
COOPER, J. Florida Pouiov Corp. 79/02/13. 2pp, 

7902260419 DOCKET SD-303 Crystal River Nuclear Plant, Unit 3 
Forwards LER 79-009/03L-0. 
BTEWARTiW.P. Florida Power Corp. 79/02/19. lp. 

7902260433 DOCKET 50-302 Crystal RJvsr Nuclear Plant, Unit 3 
LER 79-009/Q3L-0 on 790124;while performing reactor 
protection sys functional testing, rod group 6 dropped into 
core, rod group overlap uas exceeded. Caused by "A" AC power 
breaker being left open. 
COOPER, J. Florida Power Corp. 79/03/15. 2pp. 



G4 



DOCKETED ITEMS 



STEWARTS. P F ,or 



Coyp 79yM/i , , p 



during routine operations , air 



CDWER.J. Florida r. Qlue r Corp. 79/D2/1S. 



. 



. 

Division OF Document Control. 79/01/0?. 



Co^anueal th Edis C n . 79,<H/31. 2pp, 



2 PP . 



DEED, C. Co 



mmnnuealtf, Edison Co. 79/O2/QS. (p. 



UEE.D. Commonwealth Edison Co. 79/02/30. 



7902010273 DOCKET 5O-J04 Zl nn Nut IMP P QU , Er Station, Unit 2 
A^nf 41 to DPR-39 , A ni*nd 3B to DPR-4B reducing ma, 

^H tJ Frrl%? r8SSl T iler h 0tup rate frDfn S0 F to 100 F/h J, 
add ECCS floid rate survoi 1 lance requ irementE 

SCHWENCER.A. Operating Reactnrs Branch 1. 79/01/16. 2pp. 



to License DPfi-39 



v 50 ~ 3<M Zlon N " clcar p 

ta.nH * .?" '" BUp ort of ftfnend 
Amend 38 to License DPH-4B. 

Office of Nuclear Reactor Regulation. 79/01/16. 3pp. 



3 ~ 304 Z1 n Nucl " r Powei - St.tion, Unit 2 
"? e AmET>d 41 t0 DPR - 3 ' < flmend 3S to 
Bd n" mfl< allalual " H Pressuri.er heatup rate 
Operating Heartnrs Branch 1. 79/01/10 2pp. 

^^ 

* 



Projects. 



7903010130 DOCKET 50-304 Zion Nuclear Pouer Station, 
Ref.rs to 790110 Itr to NRC, providinfl ECCS reana? 
results. R^ue.ts author i ,ation to remove ..i.? ! 



Unit 2 



REED, C. Commonuealth Edi E on Co. 79/O1/24. 



Spp . 



7902020234 DOCKET 50-3O4 Zion Nuclear Pouer Station, Unit 2 
Responds to NRC requests of 7B1I14 t, 7B1J2B for info in 
support of utll request to expand spent fuel pool storage 
capacltg. Forwards answers tn questions. 
NAUQHTON. W. F. ComraonujBal th Edison Co. 79/01/24. 27pp. 



n . w 

, Q. Commonwealth Edison C 



held (ref 
79/02/20. 



9 ?: 304 Zi " Null " r PouJar at.tion. Unit 2 

Itr requesting NRC author i i.tton to remove 
a.ial poM.r distribution mn r,itorlng sus surveillance on Unit 
i During base load operation. Forwards addl info dsscribina 
base load operation procedure. 
HEED.C. Commonuiealtd Edison Co. 79/01/29, 2pp. 



7902050324 DOCKET 30-3Q4 Z i on Nuclear Pouer Station. Unit 2 
Sd P im 'Biir 1 "? '' P""rin C0 n fBrC n e in Hauk e In 1L. 
Adit! * I *? FUtUrB PM6Ilc hear *^ intervenQr. 

?i af t;: J p " r *tiS: T *" ln ""*- PPn rf . ^stlon, to 
LUTON.E. Atomic Safstj and Heunslng Qoai-d Panel. 79/01/19. 

79022Q0433 D DGKET 50 _ 3()4 zion Nucjcflr poLJpp stfltion , ^ 
CoTtlFicatfl of five & .amend to Certificate of Svc for NRC 

"Si!?" f! 71 5Ummflr 'J disp OB itio.n SE-rved nn 7902 CH. FM Almete-r 
srtigavi 



GQDDAHD.R. 



. 
CommonuOHlth Edison Co. 79/O2/OS. 15pp. 



790SS3005i DOCKET SD-304 Zlon Nuclear Pauer Station, Unit S 
Motion for summary di spos t tiou. Urges dismissal of State at 
FL's Contentions iC, 7.0,9 & 14 Fnr lack of a genuine matl 
ISBuo of fatt to be ad jud i catad. Aff i davits of Hosfard, 

nninjn "' A]mB ter R Certificate of 3vc one 

OODDAHD.R. J. Branch 2. 79/01/31. 80pp. 

79023301B6 DOCKET 30-304 Zlon Nuclear Pouier Station, Unit 2 
Forwards 1970 Annual Hcpt for util, 
DfiESEMftNJJ, (1. W. Commonweal th Edison Co. 79/02/15. lp. 



DOCKET 30-304 Z i <m Nut 1 Bar Pou, er Statim,. Unit 2 
1970 Annual Hep t. Reviews 1978, five yesr summary of 
operations & ngt, . Flnanical statement 
* ConmiDnueal th Edison Co, 7B/12/3I. 2fl pp . 

7902210339 DOCKET S0-30fl Zion Nuclear POLJ BP Station. Unit 2 
Foriuaros EntftirseiuBnt No 2 to Hinders ED-1 , XD-1 , EO-3 XO-S 
ED-3, KD-3. EO-Sf, XD-29, ED-30. XG-ao, EO-42, XD-43. EG-43, XB-43, 
eyldncinn secondar financial protection, 
OSTER.J. Corfunpnioea] th Edison Co. 79/O3/14. 15pp, 

7903260233 DOCKET SO-3O1 Zion Nuclear Power Station, Unit 3 

2TT l ir*i U ,"" ir( 'n'" PH V ur *n1 < Anting CIpe ri Hnce s. 

8EJFRIT,K.y. Reoi^n 4, Dallas, Office of the Dirtor. 74/09/O3, 

7902010S64 QDCHET 50-304 Zion Wucl H ar p oue r Station, Unit 5 
Forward* Amend 41 to DPH-39 (. AmcnJ 39 tn DPR-4B 
ECHWENCEfl,A, OpBTfltlng ReactorK n ran ch 1. 7V/O1/16 2pp 



7902060297 DOCKET 50-3O4 Zlon Nuclear Poyer Station, Unit 2 
Forward* Round 4 response to NRC request for addl info re 
pent fuel pool Btorage capaciti, e xpans i on. Provides 
ductility ratios, numerical values of hydrodynamie mass used 
in analysis of racks, i info re .spent fuel liner 
NflUGHTQN, W. F. Commnniuea 1 th Edison Cn. 79/O1/26. 33pp. 

7902020174 DOCKET SO-3O4 Zion Nuclear Power Station, Unit 2 
Informs NRC that revaluation O f ECCS callad for in 780421 
order- is corapletBj appropriate licensa amend (, Tech Spec 
change Is being prepared. Requests NRC authorlie base loading 
w/o a.lal POU.BI- distribution monitoring sys. 
REED,C. Commonuealth Edison Co, 79/01/29, 3pp. 

7902120191 DOCKET 50-301 Zion Nuclear Power Station, Unit 3 
Forwards proposed Tech Spec changes to conform to ECCS 
rsanalusiE i, revised LOCA analysis for mod of accumulator 
vols to appropriate levels. Amend is combined Class 3 !, 1 
amend. Appropriate fee remittance end, 
I?EED,C. Commonweal th Edison Co. 79/02/O2. 90pp. 

7902260469 DOCKET 30-304 Zion Nuclaar Power Station. Unit 2 
Requests addl info re leakag a/ 6eB pag e of spent fuel basin & 
SV B ,? V ;?* CDmrao ^"ltli Edison/NHC correspondence. 
aiMGQ.C, Pollution Environmental Problems. 79/02/02, lp, 

79021S03BO DOCKET 90-304 Zion Nuclear Power- Station, Unit 2 
Forwards revised pagtB to proposed Tech Specs submitted to 
clarify base load mode of operation. 
REED.C. CommonwBal th Edison Co. 79/02/O9, Spp. 

7903200037 DOCKET 50-304 Zion Muclear Power Station, Unit 3 
Provides info re requested license amend to change rod bow 
penalty curve t< affective full power hours clad collapse 
limits. Tech Spec mods end which reflect limited scope of 
NRC review, 
REED.C. Commonwealth Edison Co. 79/02/13. 4pp. 

7902270233 DOCKET 30-304 Zlon Nucloar Powar Station, Unit 3 
Requests amend to Tech Bpoca App A for Licenses DPR-39 t. 
DPR-4a. Proposed amend t. Offsite DOBB Calculation Manual 
enc 1. 
REED.C. Commonwealth Edison Co. 79/02/li.. 91pp. 



7902270341 DOCKET 30-3O4 Zlon Nuclear Power Station. 
Offsite Dose Calculation Manual. 
* Commonwealth Edison Co. 79/09/37. 193pp. 



Unit 2 



7902Z60462 DOCKET 50-304 Zion Nuclear Power Station, Unit S 
Forwards requested Tech Spec change fc supporting 
documentation for mod of spent fuel , storage rocks. 
RED,C, Commonwealth Edison Co. 79/O2/H3, 20pp. 



DOCKETED ITEMS 



79O212O034 DOCKET 30-304 lion Nuclear Pouer Station, Unit 2 
Forward* IE Info Notice 79-01, " Cera en-Pater son Hydraulic 
Bhocfc & Sway ArrstorH <H9SA>". 

KEPPLER.J.G. ReDion 3, Chicago, Office of the Director. 79/OE/OS. 

4pp. 

790221022O DOCKET 50-304 lion Nuclear Power Station, Unit 3 
Foruiardi IE Bullttin 79-O1. "Environ Qualification of Class 
IE Equlptntnt. " 14/1 lit of 11 systematic evaluation program 
planti for which no action is required. 
KEPPLER. J. Q, Region 3. Chicago. Office of the Director. 79/03/09. 



7902270B32 DOCKET 30-304 Zion Nuclear Power Station, Unit 2 
Forwards IE Info Notice 79-03. "Limi torque Waive Geared 
Limit Switch Lubricant." 

KEFPLER.J.Q. Region 3. Chicago. Office OF the Director 79/Q 

lp. 

7902130170 DOCKET SO-304 Zion Nuclear Power Station. Unit Z 
Foruardi "Operational Environ Monitoring in Lake Ml near 
JTion Station." July-Sept 197B, re impact of deletion of 
thermal litliti at facility. 
HANDKE.N. Commgnumalth Edison CD. 77/01/21. Ip, 

7902130173 DOCKET 30-304 Zlon Nucluar Power Station, Unit 2 
"Operational Environ Monitoring In Lake HI near Zlon 
Station" July-Sept 76, a suppl r apt. Cone lud ITS that deletion 
of thermal limits ha* no measurable effects on bjota & on 
chemical water quality. 

CZAJKOHSKI.O. P. , ARNESON. R.D. Haiti ton Environmental Science* 
Corp. 78/09/30. 411pp. 

7902130083 DOCKET 5O-304 Zlon Nuclear Power Station, Unit 2 
Foruardi monthly operating rept for Jan 1979. 
HANDKE.N. E. Commonwealth Edison Co. 79/O2/OB. lp, 

79Q21300B7 DOCKET 30-3Q4 Zlon Nuclear Pouier Station. Unit 2 
Monthly operating rept for Jan 197?. 
JEFFERB.J. Commonwealth Edison Co. 79/02/06. llpp. 



79Q236D479 DOCKET 5O-3O4 7-inn Nuclear 
Forwards LEF) 77-G29/O3X-1 . 
HANDKE.N. E. Commonwealth Edison Co. 



nr Stiitinn, Unit 3 



790224.0478 DOCKET 3O-3Q4 Zion Nuclear Pawnr Station, Unit 2 
LER 77-039/03X-1 on 77OSHQ: tun i I e attempting to increase 
charging flow by closing charging pump f I PHI valves, valve 
SMOV-Vcaill failed to close fully from control room. Caused 
by 1 oui setting of modu-1 Sflfl-OO operator motor 
REISB. J. F. Comrnoniuefll th Edison Co. 79/O2/14 lp. 

79O223O119 DOCKET SO-305 Kauiautioe Nuclear Power Plant 

Informs that TflADDC I'amjiMot 350-30, " Jntersorvit a Procedures 
for Instructional Sijs Development" referenced In NUREQ-Q219 
it available in ml c rof 1th a form from NRC. 
BEBAH, W. J. Division of Document Control. 79/O1 /09. 2pp. 

7902130079 DOCKET 50-305 Kewaunee Nuclear Power- Plant 
Forwards plant security manual f. Itr of undor-mtandlng 
between utll & sheriff of Koiuauneo County, WI . Altac hmen t E 
withheld (ref 10CFRS. 790). 
JAMES. E. W. Wisconsin Public Service Corp. 79/O1/3Q. lp 

79Q2H6Q07B DOCKET 9O-303 Kowaunqe Nuclear Pouier Plnnt 

Rcauests addl info fur fire protection naPety ovalifation 

r open Items on Pire brigade siae d sa f o shutdown 

Instrumontatl on. 

BCHWENCERiA. Operating Reactors Dranch 1, 79/0-1/31. 3pp. 

790B2301S7 DDCKET 30-303 Kowaunoo Nuclear Power Plant 

Provides nddl info re flro protection lafoty e voldfl tton in 

rmponie to 790131 request. 

JrtMEB.E. W, Wtaconaln Public Service Corp. 79/OS/IS. 3pp. 

79022B0317 DOCKET 50-aoa Kouauneo Nuclear I'auvr Plnmt 

Util has not received approval of proposed ncturitu plnn but 
has proceedeil iu/majoT mod d jiroc oiluro- devotopnent ofport, 
Attnchmffne addreas-eB itatue. of plant ro socurltij 
rxnilremnntl, Plan withheld Cref 10CFR3, 790>. 
JflHEB.E.W, Wiaconoiln Pud 1 i c Service Carp. 79/U2/E3. lp, 



770BI40209 DOCKET 3O-304 Zion Nuclear Power Station, Unit 2 
Foruardi LER 77-OBO/03L-0, reclasaif i*d as reportable on 
79O109 after internal reviBui. 
WANDKE.N.e. Commonwealth Edison Co. 79/01/37. lp. 



7-7032BQ036 DOCKET 30-305 ItduauTiae Nuclear Pouor Plonl 

Forwards State of WI ansueri lo licunsoe'i first sut of 
Interrogatories, 

WALSH, P. WiSCiinsin, Btate nf, 7B/IU/a6. lp. 



790Z140217 DOCKET 30-3O4 Zion Nuclear Poiuer Station, Unit 2 
tEB 77-OBO/03L-0- on 771301 : during normal operation, a team 
generator level indication 2L-B47 failed high. Cause unknown. 
CAMPBELL, J. Commonwealth Edison Co. 79/O1/37. lp. 

7902140221 DOCKET 80-304 Zlon Nuclear Power Station. Unit 2 
Forwards LER 77-OB1/Q3L-0. reclasslf led as re-portable on 
79O109 after internal review. 
HANDKE, N. E. Commoniueal th Edison Co. 79/O1/27, lp, 

790214QEB4 DOCKET 30-304 Zion Nuclear Power atatlon, Unit 2 
LER 77-OS1/03L-0 on 771 123: during normal op era tl on, steam 
generator pressure transmitter 2 PT-S46 failed high. Caused 
by loose aetscrew In linkage to forco motor. 
CAMPBELL, J. Commonwealth Edison Co. 79/01/27. lp. 

7902B40393 DOCKET 30-3O4 Zion Nuclear Power Station. Unit 3 
Forwards LER 79-002. /Q3L-0. 
HAKKE.N. E. Commanuiealth Ediion Co. 79/02/06. lp. 

7902260400 DOCKET SO-3O4 Zion Nuclear Power Station, Unit S 
LEH 79-OOH/03L-0 on 790107: dur inn survell lance, DUB 239 
transformer feed failed to auto reclose uhei. re-energlied. 
Caused by dirty relay contacts. 
ROTHERMEL, R. R. Commonwealth Edison Co. 79/02/06. Ip. 

79022A0401 DOCKET 30-304 Zlon Nuclear Poiuer Station. Unit 2 
Forwards LEH 79-077/03L-0. 
MANDKEiN.E. Commonwealth Edison Co. 79/02/OB. lp. 

7902260403 DOCKET 30-304 Zion Nucluar Power Station. Unit E 
LER 7B-077/03L-0 on 7B0230: during refueling tests, level 
ch-nnel 2L-460 out of tolerance at high & lou aetpoinU 
Caused b<j blown resistor ,b diode being reversed, causing 
improper voltge regulation (Haoan Control 118) 
ROOERB.C.L. Commonuiealth Edison Co. 79/02/O8 



7902260423 DOCKET 30-304 Zlon Nuclear Po 
Forwards LER 79-O04/Q3L-0. 
WANDKEi N, E. Commonwealth Edison Co. 79/02/03. 



lp. 



'er Station, Unit 2 



lp. 



8 - a 4 """ Nuclear Pouer Station, Unit a 

79-004/03L-0 on 7901O7: durino normal opet-at ion. Unit 2 
component cooling monitor 2HEQQ17 failed low, Intermittently 
alarming in eontrol room. Caused by faultg low voltage supply 
(Aul Instruments Model PSD-15K "HF'y 

CommonuEalth Edison Co. 79/02/OB. lp, 



79022BOOod DOCKET SO-303 Ksuiaureo Nucloar PDUIBT Plnnt 
Stats o? HI antuion to liconBeo'H first tot DP 
(ntarrooatorles. Raspondl to Intorrogntor I DO 1-SHi eicopt for 
Interrojatorij 3 re proposed incrooso in ipont Puul itorone 
WALBH.P, Miscnntn, Btate o*. 7H/12/HA. 3pp. 

790HOS003B DOCKET 00-305 KauiDunee Nuclear Pduler I'Unt 

JlBsponds to 781E11 Itr requesting info re reliability oP 
neutron absorber pUte tc ju tlf icntlon of proprietory stalui 
for gcn info. NJtC BER li applicant ronpons*! to stato 
Interrogatories provide relevant Info. Local PDD helpful 
OLMSTEAD.U. J. Office of tli ExDtutivo Loyal Director. 79/01/09 
Hpp. 

790BH300AB DOCKET 3D-303 Keuaunoe NuclBHr Power Plant 
Co-lntervanors' request for ao-dn,, extvnalon of time to 
r*pond to applicant's motion Por summary dlaponltion Bvc 



. 
CORDARO, W, M. 



LakBBhore Cltlicns for Bute Enuruy. 79/OI/1B. Hpp. 



790B230048 DOCKET 50-303 XeuBunee Nucloar Power Plant 

Informs at HI Public five Carp's opposition to intension of 
time requested bu co-lntervenori, on 79011B, 
BAKER, D-A, Folsy fcLjirdner. 77/01/33. app. 

7902230040 DOCKET 30-30D Ksuaunec Huclnar Pounr Planl 

Informs of HI Public Bvc Corp'o onpos i tion to NRC motion for 
extension of tlmn for response to- pending (nollon dun to 
ilnBiTB for timely c Dns i d orat ton of merits 
BAKER, D, A. Polny t, Lardner. 79/01/B3, 2pp. 

790H050302 DOCKET 30-309 Kpununae Nuclear Pavor Plant 
Ortfer* extenion of time until 79020B to file ansuier to 
lieensoe's motion for summary dlspasition. 
LftZO,R.M. Atomic BFetij and Licensitig Board Panel. 77/01/31. 

790B0600tB DOCKET 30-303 Keuauneo Nuclear Power Plant 
Orders 790313 evidfintlorv heoring in TUB Rivers, Wl, 
concerning proposed llcenie amend r incroated spent fuel 
storage capacity. r 

LAIO.R. M. Atomic Safety and Liconsing Board Pnnel. 79/01/23. 

7903010316 DOCKET 30-305 IWaunoo Nuclear Power Plant 
Notification of TBCOHI ti tutlon oF ooard. Dr E A LuBhlts 
replaces flO Drigth. UIUPDICB 

LAZQ.R.M, Atomic Safebg an ,S Llcenilng Doard Panel, 79/01/21. 



2pp, 



Jp. 



56 



DOCKETED ITEMS 



74/O9/03 



ar Plant 



7903150190 DOCKET 5O-305 K. u , unt . Nuei ... 
Faruardi Arnencf 24 to Lice-ns LPB-nV 

Opera*,,,,, H.,t tors' Branch J. 79/O1/15 2pp. 



7^02010340 DDCKET 50-305 Kfwun.. Nucl.ar Pou, B r Plant 

ForLjarda Insp R H pt 50-305/7B-23 on 7Q1127-1201 Notit B n t 
violation withheld ( re f 10CFR3 790) Notic B|D P 

H I ND.J.rt. Regions. Chicago, Safeguapo", Branch. 79/01/12, 3pp. 



79Q21S0203 DOCKET -in--jnc u 

Amend Pa t , 50-305 K^unee Nuclear Pnuer Plant 



' 



Jng R e act ^ 5 'c^ fl nc^ 1. 79/O1/15. 9PP. "porwarda r*^!^ 5 ~ 305 Kelu f u " e = Nuclear Power Plant 



of Nuclear Rhetor H.B-l.tion. 79/01/15. 4 pp . 



MHHENCER. 



r Pouiar Plant 

anch I. 79/OJ/15. 2pp, 



2pp. 



R.lr^ "T" u tor ''"' Cycl, 1. 
Reactors Branch I. 79/01/19. J-7pp. 



Operating Reactor. Drench 1. 79/01/19. 



2pp. 



-.,... r r, ucl ear Hector FlegL l.tlon. 79/O1/30. 2pp. 
DOCKET 30-309 ., NuelDdr Ppll , er p[flj , t 



m Dn ,ln Public Strvi*. C.rp. 79/02/06. 2pp. 



S c 0nB in Public 8 B) -vi Cfl Corp. 79/02/16. 9pp. 
770S210150 DOCKET 50-303 H B u, 9uneB Nue l O ar P t, B r Plant 



KEPPLER.J.O. RE9ton 3l c,i CagD , omc . of tha ^^ ^^ 

7 ^ 01 " DDCKET 30 ~ 305 KBUI8unBO N uc l efl r Pouar Plant 

JAHES.E.W. Hi=c 1 >nnn' 1 pubnc i B B r e vU B Corp. 79/03/O9. Spp . 
7902210198 DOCKET 30-3O3 Keurauneo Nuclear POL, 






7902270373 DOCKET 50-303 Kt M un. Nuclear P D[UE 
" " 



KEPPLEB.J.O. Regl( ,n 3) C h ,ca go , 



of th. Hirecto, 79/03/09, 



79oaiaooao DOCKET so-aos K 01UflunBE Nuci Bar p ou)er Plant 

jAMEr E v n u ly "T^ 1 ^ pt *-r o a ; 197" nt 

JAMES, E.W. UUcnnsin Public Bsrvice Corp. 79/O2/07 



DOCKET 50-30S Keuaunoa Nuclear Pomer Plant 
uIi'i'Are opDrat * n 9 re Pt For Jan 1979. 
WALLACE.J.J, Wisconsin Public Servica Corp. 79/03/03. 4pp. 



Uion of Document Control. 79/01/09. 2pp. 



MAR,L.O. Northern States PouBr Co. 79/02/13. 



rn States Pouur Co. 79/02/05. 2pp. 



lp. 



r "r----- :;.s-'v*.r? 7 %'" 

JOHNSDM.n, o. Morther-n State* Pouer C D . 79/Oa/OB. Bpp. 

:7;E^;E 5 vv---"-'" ----- 

vu <-iiiict| ivr-iv/ for calendar uear 1970 

JOmBDN.B.0. Nnrth.rn StSteli Pou^r Co 79/02/21. 3pp . 



. 

Office of the Director. 74/09/03. 



-^!^:;: 'r 1 -- N -. , nit 
^ l d-^^^ 

Bpp . A " Ut " n * Dlroct '"' " Engineer, Project.. 



of C ontPO , Rod 
" E,. on Corp.,. 






ran..nt fr PWR, " 
1 ="'" >Nl(el " r(!o " lnc ' 



790SS20079 DOCKET SO-306 Prairie laland Nucloar Station, Unit S 
PWRs" An """ il nf Contral "^ Ejection Transient far 

DURNSIDE.R^J., HRVSJNKJ.T.L.. PRUITT, 0. W. E,, on Nuclear Co , Inc 
(subs, of Eon Corp. ). XN-NF-78-14. 79/01/31. 53pp. 

790H2B0307 DOCKET 30-306 Prairie Island Nuclear Station, Unit 2 
Forward. ECCB raanalusis usln 9 Fob 197B ver.ion of 
Untlnohouae ECCS evaluation model for large break LOCA 
anal vvis. 
MAYER, L. 0. Northern States Power Co. 79/03/21. Ip. 



DOCKET B -3* Prairie Island Nudear Station, Unit 3 

^ f . n " lyai * for 1 * r ' e bTBafc UOCA analysis based on 
Feb 1970 evaluation model. 

Northern Staites POUJBT Co. 79/02/31. BBpp. 

7-703090390 DOCKET 30-304, Pralri e Island Nuclear Station, Unit 2 
Forwards IE Imp Repts 30-283/78-30 !, 50-306/7B-20 on 
7B1101-30. No noncompllance noted 

Branch LI '79/01/03' 9l 2pp 31 CtllCa9 ' "'^ OP tl-n. Nuclear S.pport 

7902090391 DOCKET SO-306 Prairie Island Nuclear Station, Unit 3 
IE In*p Rept. aO-2Bff/7B-20 fc SO-306/7B-20 on 781101-30 No 
noncompliBnce noted. Major areas inspected: operations, 
radiation protection, security, malntanance. Burve 11 lance 
?*S^ g !! nll * tion & aomi ''iti-ation b refueling Bhutdoun. 
raiEHABEND,C.D.. WARNICK.R.F. Region 3, Chicago, Reactor 

Operations Nuclear Buppart Branch. 79/13/29. 9pp. 

790BOB0014 DOCKET 3O-306 Prairie Island Nuclear Station, Unit 2 

I d !. r S In>P R ' pt * 5 -2B3'-19 * 30-306/78-19 on 
4-19.NO noncampliance noted, 

a' J ' ' " lotl 3 ' Chicago, Office of the Director. 79/01/08. 

79020B001 6 DOCKET SO-306 Prairie Uland Nuclaar St.tlan, Unit 2 
IE In.p R.pt. SO-aaS/78-19 fc 80-306/78-19 on 7B1114-1B He 

?nUI5 iSS t V?J' d : M ! J<lr flrB " inB P=t<"' : routine, announced 
In.p of LER 7B-16, b IE bulletins (. circular follouup 

uni2 V ! * t > Jlflc t't"' of , eUctrlcal equipment. 

HUOHEB.T, Region 3, Chicago, Office of the Director. 78/12/26. 

790BUOB86- DOCKET "0-Ma Pr-i-ie Island Nuclear Btation, Unit S 
f ln *f R * pt * so '^a/7B-lB !. 30-306/7Q-IB on 
fc 70113f) - 120 l.No nancompliance noted. 



DOCKETED ITEMS 



57 



7902260S-1 DOCKET 50-306 Prairie Island Nuclear Station, Unit 2 
7P, K P ,2S?*i 30 ^ BB ^-1B I- 30-306/7B-iB on 7B11I4-V? fc 
781130-1201-No noncompl lance noted. Major areas In.pectod' 
radUtlon protection prooram Par operation * refuBllna, 
HU r"i q ' l *n. 1 ,5"2'2 I1 " lie " 1 "* aul)I * a ' training, procedures 

Facmtu't M.t^ V ', N ^-; " 8 " m '"-'" "*" a- Chicago, Fuel 

t-aciiity t< Materials Safety Branch. 79/O1/00. , 13pp. 

790S0700B9 DOCKET 80-304 Prairie Uland Nuclear Btatlon, Units 
rl r r lt' if t \ a t, 7BlaSl . ltr '"""'"'"B NUC of ,t-p. taken to 
u?r,^* c: . t . v ' Dl " t!ioT1 not " d ln 7B1204 insp rept. 
HIND, J, A. Reolon 3, Chicago, HafeouardB D rancn . 79/01/36. Ip. 

7902130119 DOCKET 30-306 Prairie I. Urn! Nuclear Station, Unit 2 

flh^rSV 6 : A fD N S* let "-'"^r9 0n -Pater.o n Hydrau ic 
ahocli h Suay Arreitors (HBBA). 

KEPPLeR.J.Q. Reflion 3, Chicaao, Office of the Director. 79/02/O2. 



)-306 Prairie Island Nuclear Station, Unit S 
roruara IE Hulltln 79-01, "Environ Qualification of Clasc 

hi.*. "" i, " ? f " B U Bt ^atic evaluation program 

plant, for which no action is required, 

KEPPLEfi, J.O. R flS ion 3, Chicago, Office of the Director. 79/02/0?. 



n "S-? 06 Pr< " rie l * lana *""="' Cation, Unit 5 

??r, t . n Z ? q * i ; t 79 ~ 3 ' ""-"a i torque Valve Qeared 
Limit Suiitco Lubricant." 

KEPPLER.J.O, R Bion 3, CMca OD , Office of the Director. 79/02/O9. 



S? CKET ?- 306 T-irir Island Nuclear Station, Unit S 
"In"vlc Imp Examination Summary., " 7B11S7- 

s:*;j! &' p Tapt "^*< > ^ * 

MAYGR.L. 0. Northern States Power Co. 79/02/SO. Ip. 

7902330168 DOCKET SQ-30i PrairU i.iand Nuclear Station. Unit S 

intirvic* Inp-Exmlnatian Bummaru. Prairie Island Nuclear 
Osneraing Plant Unit 2," 781127-1209 

W ' NDrth "" Bt-tea p oul er Co. 



7902150270 DOCKET 50-306 Prairie Island Nuclear Station, Unit 2 
Forwards monthly operating rept For Jan 1979 
MAYER, L. O. Northern States Poiuor Co. 79/OS/1S. !p. 

7902150283 DOCKET 5O-306 Prairie Island Nuclear Station, Unit 2 
Month ly operating rept For Jan 1979. 
HUNSTAD. A. A. Northern States Poiuer Co. 79/03/01. Bpp. 

7902130171 DOCKET 3O-306 Prairie Island Nuclear Station, Unit 2 
Forwards LER 79-OQ1 /O3L-O 
MAYER, L. d. Northern States Pouier Co. 79/O2/O9. Ip. 

7903130174 DOCKET 90-30i Prairie Island Nuclear Station, Unit 3 
LER 79-001/03L-0 on 7901 12: dur ing surveillance test found 
that instrument 2TM-4O4V, nvurpouer delta-T summing circuit, 
had drifted due to drift In Foitore model 66RC-OL summing 
unit. 
HUNSTAD. A. A. Northern Status Power Co. 77/OH/09. Ip. 

79023B0234 DOCKET SO-3O6 Prairie Island Nuclear Btatien, Unit 2 
F-oruariPs LER 79-OO2/03L-O. 
MAYER, L. D, Northern States Poiuer Co. 79/02/23. Ip. 

7902220119 DOCKET 5O-309 Maine Yankee Atomic POUBT Plant 

Informs that TRADOC Pamphlet 330-30, "Interservi ce Procedures 
for Instructional Sys Development" referenced in NUJ1EQ-0219 
is available in microfiche Form Prom NRC. 
DESAW, W. J. Division of Dncunent Control. 79/01/O9. 2pp. 

7902030192 DOCKET 50-3O9 Maine Yankee Atomic Pouer Plant 
Provides info re fire protection sya mod s, Di BCUSSOB Firo 
harrier penetration seals. fire pumphouse fire protection, 
protected suitchgear room floor penetrations t, protected 
cable tray room. 
MOODY, D. E. Maine Yankee Atomic Pouier Co. 79/01/29, 5pp. 

7902030249 DOCKET 30-309 Maine Yankee Atomic Pauor Plant 
Forwards revision to modified amended security plan 
Withheld (rof 10CFH2. 790). 
MOODY, D. E. Maine Yankee Atomic Poiuer Co. 79/01/29. Ip. 



7902360333 DOCKET 50-3O9 Maine yanke-e Atomic Power Plant 
a"|!!;rJ B """""H of PUR purging * venting oiperiences, 
SEYFRIT.K. V. Region 4, Dallas, Office of the Directc 



74/09/O3. 



7903140327 DOCKET 30-309 Maine VankO* Atomic I'oiuer Plant 

Minutes of 7BOS35 meeting In Wesh i ngton, DC to review Tec^est 

of utll to operate plant up to pnuer of S, 630 MHt, 

ACR9 - Advisory Committee on Reactor Safeguards, 70/O5/HS. 

7902030034 DOCKET 90-309 Maine Ynntee Atomic Pouior Plant 
Forwards Amend 43 to License D-Plt-36, EIA t, notice o P 
issuance/negative declaration. 
REID.R.M, Qpe-raUng Reactors Dranch 4. 79/01/22. Epp. 

7902030029 DOCKET 30-309 Ma-ine Yankee Atomic Power Plant 
Amend 43 to License DPR-36 eJianglno App B Tech Specs to 
delete monitoring rea.ii(remonts userf to tfetermino effects of 
eondenier coallna mater SU.B on plankton t, larval oroani ima 
& effects of operation on marine ecosys of nearbaj waters 
REID, R. W, Operating Reaetera Branch 4, 79/O1/22. Bpp. 

7903030030 DOCKET 30-309 Maine Yankee Atomic Pouer Plant 
EIA supporting Amend 43 t^, Licence DPR-36. Repts no major 
effect* of proposed amend on various type* of nlanliton I, 
larval organisms. No EIS necessaru. 
* Office of Nuclear Raactor Regulation. 79/01/H2. lOpp. 

79020S0031 DOCKET 30-309 Maine Yankee AtDmic Power Plant 

Notice of liEuance of Amend 43 to License DPR-36 i, negative 

declaration for EIS. 

flEID, R. W, Operating Reactor* Dranch 4. 79/01/HB. 2pp. 

7902130109 DOCKET 5O-3O? Maine Yankee Atomic Pouer Plant 
Responds to NrtC 701130 Itr re request for additional Tech 
Spec, to meet arbitrarily selected triterU of 1QO rera 
thyroid dose. Bees no noed to propose add 1 Tech Specs 
MOODY,D.E. Maine Yankee Atomic Power Co. 79/O3/03. 2pp. 

7902060423 DOCKET 50-309 Maine Yankee Atomic Pomer Plant 
Foruiard. IE Insp Rept 30-307/73-32 on 701213-14 No 
noncompllance noted. 

SMITH.O.hf. Region 1, Philadelphia, Fuel Facility !, Material 

BaPetg Branch. 7B/12/26. Spp. ^ 

790S060427 DOCKET BO-309 Maine Yankee Atomic Poiuer Plant 
IE Insp Rapt 50-309X78-22 en 7BlSia-14.No noncompl lance ' 
noted. Major area* inspoc ted: emorgency plannino ineludtno 
coordination u/o#flte support ajsncies, facl]itI B s !, plan 
implementing procedures, 

DONALDSON, D. E. , STOHR, J. P. RfrgloT, 1, Philadelphia, Fuel 

Facility fe Materials SaPoty Branch, 7B/12/21. 6pp. 



60pp. 



7902Q102B3 DOCKET 50-309 Maine Yankee Atomic Poucr Plant 
Forwards IE Circular 79-O2, "Failure of 120 Vo.lt Vital AC 
Pouter Supplies. " 

CRIER, B.H. fisgion 1. Philadelphia. Office of the Director 

79/01/16. Bff. 

7902130011 DOCKET 30-309 Maine VanVee Atonic Pouer Plant 
Forwards IE Info Notice 79-01 , "Berg- en-Pater BOH Hydraulic 
Shock & Btiray Arrestora (HSSA)." 

GRIER.B.H. Region 1, Philadelphia. Office of the Director. 

7V/Q2/Q2.. 1 p. 

770SSQ049Q DOCKET 50-309 Maine Yankee Atomic Power Plant 

Forward* IE Bulletin 79-01, "Environ Oualif i cat! on of Class 
IE Equipment. ' U/list of 11 systematic evaluation program 
plant* for uhicrt no action is required 

7 9 H ' iPr 9 '"" 1 '' Phlla <""^- ' ' *" Director. 



DOCKETED ITEMS 



7932330301 DOCKET 50-311 Salem Nuclear Generating Station, Unit a 
"Fire Endurance Test. Penetration Seal Sus in Precast 
Concrete Flonr Utiliiing Slllcone Elastomers Carborundum 
Design FC-24& " 

* Public Service Electric !- Oaa Cn. of Neu Jersey. 77/03/18 
34pp. 

7902090094 DOCKET 50-311 Salem Nuclear Generating Station. Unit S 
Opposes issuance of operating I i tense. Kep f ord 7B13Q4 Itr, 
addl info, t> news article end. 

ZITZER.P. Committee for Application of Nuremberg Principles to US 
Nuclear Power Production, 79/01/18. 9pp. 

790231021,0 DOCKET 5O-31 1 Salem Nuclear Generating Station, Unit S 
Foruards Endoraement 31 for Policy NF-33O i. Endorsement 23 !< 
26 for Policy MP-70 for calendar year 1979. 
CORREA.C, Harsh !< McLennan, Inc. 79/03/14 Ipp 



7902300056 DOCKET 50-309 Maine Vanl.ee Atomic Pouer Plant 
ForuarifB montfili/ operating rept for Jan 1979. 
HQODY, 0. E. Maine Yankee Atonic Pouiar Co. 79/O2/12. Ip. 

7902MODS7 DOCKET 5O-309 Maine Yankee Atomic Pn^er Plant 
Monthly operating rept For Jan 1-979. 
SJOGREN. f) M. Maine Yankee Atomic Pouiur Co. 79/OS/12. BBpp. 

770S040070 DOCKET 3O-311 Salen. Wuclear Oenerating Station, Unit 2 
Approves request for withholding info suomi tted in Public 
Svc Electric Gas 7B112O Itr containing data on mass t, 
energy releases to containment due to postulated main steam 
line break. Info could jeopardiie copnpetl t IVB position 
PAHR. 0. D. Light Water Reactors Branch 3. 79/01/22. 3pp. 

7903080164 DDCKET 50-311 Salem Nuclear derating Station, Unit 3 
Forwards responses to request for addl info re NRC Question 
13.9 (Pi-eoperdtion Testing) parts A thru D.Encl info will be 
^ncorp orated in FSAR as amend. 

Public Service Electric I, Gas Co. of Neu Jersey, 



7903070207 DOCKET 3O-311 Sal Nuclear fl*neratin Station, Unit 2 
forwards addl info in response t<i NRC Question 5 91 on 
response spectra !. daraping values irsed in util seismic 
analuees.at compared u/those in Reg Guides 1 AO (. I il Info 
will be incorporated into FSAR in amend to application" 

bUC aarvice E>trlc t, Ga, Co. of Ney Jersey. 



7703S30141 DOCKET SO-311 Sfl lem Muc I ear Operating Station, Unit 2 
Retjuei-ts e, fl mptlon From requirements of 10CFR50,flpp 0, 
paragraph IV. A. q re reactor vea.ol bolting matl lateral 
M!T?. nS ir mB " urBm "' t5 * impact energy requ i roments. 
79/03^2 3pp 3BrVlCe Eleetr '= <- Oas Co. of Ne^ Jersey. 



5 " 3 ' I ! altffl NUCl " r >-"".tln fl Station, Unit 2 

s:;;!;!;* 1 " 111 for aeneral toiitentt f opfsite 

Light Water Ffeactors Branch 3. 79/03/14. 7pp. 



PARR.D.D. 



7903230191 DOCKET 30-311 Salem Nuclear Oerterating Station, Unit S 
Forwards reBponses to NRC 79OI19 reque.t for addl info for 
.,'" Dr^tflCtion review. W/f our overBiio drawings. Responds to 
^M??;!*^' 3 ! l ;''3-'"'"'"'ai.aB i 3C,B7.3i t 37 
79/02/JS 'app Service Electric & Gas Co. of Neu Jersey. 



re 5 t,M~ 311 f alBm NUCl " r " ". Unit S 
f re Test an Silicon. Rubier Penetration SeaU in Masonry 
Wall Design WP37fl" conducted oy Factor,; Mutual Research. 

9^vice Electric t, Q as Co. of Naui Jersey. 75/08/09. 



n* f" 311 Salem Nuclear 0-"tin fl Station. Unit S 

A,?.M M!"' 1 " 1 n 7fiOA011 at f^* 1 """ Cement 
Association Describes const. test procedure b lists results 

?n.T i? I 6 ? 'S 1 " 1 "<=*'' on silicone foam penetration *eal 
" " ' S lnCh th ' t "nei-.*. Ptoor slab. 



7903230165 DDCKET 90-311 Salem Nuclear Generating Station. 
Faruiards Endorsement 2 to AMI Hinder EB-6O, provid ing 
secondary financial protection for calendar uear 1979 
CDRREA, C. Harsh (. McLennan, Inc. 79/03/16. 3pp 



Unit 3 



7902330171 DOCKET SO-31J Salem Nuclear Generating Station, Unit 3 
Forwards Endorsement 33 to ANI Policy NF-23O for calendar 
year 1979. 
CORRErtiC. Marsh t. McLennan, Inc. 79/02/1A. 3pp. 

7902130237 DOCKET 30-311 Salem Nuclear Generating Station, Unit S 
Summarizes ACP.B 790124 subcommittee meeting re application 
for operating license. Presentation given concerning 
differences betueen Unit 1 t. Unit 3 as a result of change* 
required by NRC during Unit 3 license review 
DREHER1CK.,A.W. Light Water Reactors Branch 3. 79/01/39. Spp, 

7902010202 DDCKET 50-311 9alem Nuclear Generating Station, Unit 3 
Forwards IE Insp Kept 50-311/78-42 on 7B1103. No 
none amp 1 iance noted. 

SHITH,GH. Region 1, Ph Haiti phia, Fuel Facility S. Materials 

Safety Branch. 7B/12/3O. 3pp. 

7903010203 DOCKET 50-311 Salem Nuclear Operating Station, Unit 2 
IE In*p Rept 5O-311/70-43 on 7B1109.No noncon.pl ianco noted. 
Major areas inspe cted: 1 icenseo ' s chemical t. radiochemical 
measurement program. 

PuH^inl 1[ D K !' D ^-/ 6TcfHR ' J -P H-Bi-B I- Philadelphia, 

Fuel Facility S, MaterialB Safety Branch. 7B/12/19. 3pp. 

7902080027 DOCKET 30-311 Salem Nuclear Generating Station, Unit 2 
Forwards IE Insp Rept 50-311/70-SO on 701311-14. No 
noncomp 1 iance noted. 

Sportlranch. SSJlSJw.' ""-^P"'- "ctor Cperation, Nu c,r 



7902000031 DOCKET 3O-31 1 Saler. Nuclear Generating Station, Unit a 
IE Insp Rept 50-3H/7B-50 on 781311-14. No noncomp 1 iance 
noted. Major areas inspected : overall preoperati onal teat 
program, folloiuup on previous unresolved t, open items t, plant 

NICHOLAS, H.H., MCNATT, T. G. , CAPHTON, D. L. Region 1. 

Philadelphia. Reactor Operations Nuclear Support Branch. 7B/12/BB 
7pp. 

7902010249 DDCKET 30-311 Salem Nuclear Generating Station. Unit 2 
Foru-ards IE Circular 79-O2. "Failure of 120 Volt Vital AC 
Power Bupp 1 ies. " 

79/01/?6 H ' pp nB9i n '' philadel P hi ' Office of the Director. 

7902130017 DOCKET 90-311 Salem Nuclear Generating Station. Unit 2 
Forward E IE Info Notice 79-01, "flergen-Paterson Hydraulic 
Shock ti Sulay Arresters (HSSA). " 

Re 9 i '"' 1- Philadelphia, Office of the Director. 

Ip. 



79022BOSOE DDCKET 90-311 Salem Nuclear Oenerating Station. Unit 2 
Forwards IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment." W/ 1 i s t of 11 systematic evaluation program 
plants for uhieh no action is required 

IP Befli n '' Philfldl "P hlB ' op "" -P the Director. 



data 



' tm UtEar "--"""II B*-tln. Unit 2 
on neu tuo-part Oou Corning 3-6Sla 

J Sr e f^'^'^ibBS matl properties. Product can be used 
foafpro^cis rBtT f!t r "P Jat8 Utl nfl Pour component 
MIEHI.R.Q, E Mell Surveys. 7c,/C-3/35. 5pp. 



(, Oas Co. of 



Jersey. 76/06/8B. 



7902220119 DOCKET 5O-313 Rancho Seco Nuclear Generating Station 
Informs that TRADOC Pamphlet 330-3O, "Interservice Procedures 
for Instructional SUE Development" referenced in NUREG-0319 
is available in microfiche form from NRC. 
DESAW.W.J. Division of Document Control. 79/01/09. 3pp. 

7902040347 DDCKET 50-31S Rancho Seco Nuclear Seneratino Station 
Foriuarda amend to security plan re change to General Order 
107-2 Plant Review Committee * util Mgt Safety Review 
Committee determined change uill not affect securl tu. Plan 
withheld (ref 10CFR2. 79O). 
MATTIMOE, J. J, Sacramento Municipal Utility District. 79/01/30. 



Ip. 



DOCKETED ITEMS 



790BO40207 DOCKET 50-312 Rancho Seco Nuclear Generating Station 
Forwards Amend 5 to modified amended security plan. Plan is 
acctptable u/Afnends 1 through S. Plan withheld (ref 
10CFR2. 790). 
HATTIMOE, d. J. Sacramento Municipal Utllitg District. 79/O2/02. 



79O2020212 DOCKET 50-312 Rancho Seco Nuclear Generating Station 
LEF! 79-O01/01T-O on 790129: RCS cnaldoun occurred at 120 F/h 
Caused by short circuit resulting in reactor trip. 
COLOMBO, R. W. Sacramento Municipal Utility District. 79/01/19. 
IP- 



79022i0464. DOCKET 50-312 Rancho Seco Nuclear Oeneratifig Station 
Forirds Endorsement 30 to HAELU Policy MF-75 fc Endorsement 
3i to NELIA Policy NF-212. 

MATT1MOE. J. J. Sacramento Municipal Utility District. 79/02/16 
3pp. 



7903320119 DOCKET SO-313 Arkansas NuclBar One, Unit 1 

InForniB that THADDC Pamphlet 35O-30, "lr,t erser vice Procedures 
for Instructional Sys Development" referenced in NUHEG-iQ319 
if. available in microfiche form from NRC. 
BESAWi W. J. Division of Document Control. 79/O1/09. 3pp. 



7702070035 DOCKET 30-312 Rancho 3<jco Nuclear Generating Station 
"Rancho SBCO Bldg Wake Effects on Atmospheric Diffusion." 
Investigate* diffusion characteristics w/lou uindapeed tc 
tamp InvBrsion. 

START, 0. E. , CATE, J. H. , D1CKSON. C. R. Commerce, Dapt. of 
AT<49QSS)-1004. NUREQ/CR-0456, 73/12/31. IBSpp. Available at 
NT1B. 



7903030173 DOCKET 50-313 Arkansas Nuclear One. Unit 1 

Forwards info for review as requested by fire protection 
safetu evaluation, W/att drawings FW-332 & M-E19 which shou 
fire uiater supply to deluge ays, (, figure E-690 lu/locatlon 
of smoke detectors, 
WILLIAMS. D. H, Arkansas Pouier k Light Cn. 79/01/31. Bpp. 



79O22AQ602 DOCKET SO-31B Rancho Seco Nuclear Generating Station 
Rqu*ti add] info re proposed Class II instrumentation mod 
required for safe shutdown. Need s addl info to determine 
acceptability of proposed amend especially re cabling It 
B(uipment. 
REID.R.W, Oparating Reactors Branch 1. 7 1 9/01/24. 3pp. 

7902O1O17B DOCKET SO-313 Rancho Seco Nuclear Generating Station 
"DtiW 177 Fuel Assembly Owner's Croup Asymmetric LOCA Loads 
Evaluations Program. Phase H. " Evaluated components include: 
reactor pressure vessel, fuel assemblies, control rod drives tt 
core flooding piping. 
Florida Power Corp. 7B/10/10. 9pp. 

790aOi023B DOCKET 30-313 Rancho Beco Nuclear Generating Station 
Responds to 781226 Hr requesting info on proposed mod for 
storing reactor cavity seal plate during reactor operation. 
Total, cost of mod to be 92, 000 If installed at neit 
refueling outage. Nine day 3 required for work. 

MATTIMQE. J. J. Sacramento Municipal Utility District 79/OS/Q1 
3pp. 

7902130129 DOCKET SO-31H Hancho Beco Nuclear Generating Station 
Forwards IE Info Notice 79-01, "Dergen-Pater son Hydraulic 
g/ioci (< Suiay Arresters (HS3A). 

OHQECKEN, II. H. Region 3, San Francisco. Office of the Director. 

79/02/03. Ip. 

79QH23Q071 DOCKET 30-312 Rancho Ha en Nuclear Generating Station 
Forwards IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment." W/list of 11 systematic evaluation program 
plants for which no action is required. 

ENQLEKENiR. H. Region 9, San Francisco. Office of the Director 

79/03/09. Ip. 

7902270391 DOCKET 30-313 Rancho Seco Nuclear Generating Station 
Forwards IE Info Notice 79-03, "Llml torque valve Beared 
Limit Switch Lubricant. " 

ENCLEKEN, R. H, Region 9. Ban Francisco. Office of the Director. 

79/QB709. Ip. 

790213OO67 DOCKET 50-312 Rancho Seto Nuclear Generating Station 
Forwards monthly operating rept for Jan 1979. 
RODRIGUEZ, R, J. Sacramento Municipal Utility District. 79/OH/OS, 



7902130068 DOCKET 30-312 Rancho Beco Nuclear Oenerating Station 
Monthly operating rept for Jan 1979, 

COLOMBO, R, W. Sacramento Municipal Utility District. 79/O1/31. 
19pp. 



79020100B4 DOCKET 50-313 Arkansas Nuclear One, Unit 1 

Heq_uests refund From 791 1O3 check for NFJC invoice Ol 1-79, to 
offset change in Indemnity Pee calculation procedures, Din- 
to increase in reactors to tie charged deferred payment, 
current Pee is *i por yr per MWt capacity. 
UILLIAHS, 0. H. Arkansas Power & Light Co. 79/01/33, Ip. 

79030-90349 DOCKET 5O-313 Arkansas Nuclear One, Unit 1 

Submits certified copies of EnriorsemBnt EB-4S * ED-6B to 
AMI Hinder t, XD-ia t XD-6B. to MAELU Hinder eitfimding 
coverage for 1979. 
WILLIAMS, D, H. Arkansas Pouer & Light Co. 79/O2/05. 9pp. 

7902230333 DOCKET 50-313 Arkansas Nuclear One, Unit 1 
Forwards Policy NF-210 EndorsunBnt 35 & Policy MP-7fl 
Endorsement 31 for calendar year 1979. 
RUETGR, D. A. Arkansas Pauior !. Light Co. 79/O3/23. 3pp. 

7902O1017B DOCKET 30-313 Arkansaa Nuclear One, Unit 1 

"HRU 177 Fuel Assembly Owner's Group Asymmetric LDCA Loads 
Evaluations Program, Phase 2." Evaluated components include: 
reactor pressure vessel, fuel as sambl IBB, control rod drives t 
core flooding piping. 
* Florida Pouer Corp. 70/1O/1O. 9pp. 

7902080234 DOCKET 50-313 Arkansas Nuclear One, Unit 3 

Acfc receipt oF NRC 761129 Itr re potential failures of purg 
penetration valves !. requesting schedule for justifying 
unlimited purging- Hill submit proposed Tech Specs to limit 
purging to 90-h par year. 
WILLIAMS, D, H. Arkansas Power !. Light CD. 79/01/3O. 2pp. 

790aOB018B DOCKET 30-313 Arkansas Nuclear One. Unit 1 

Refers to 790111 proposed industrial security plan revision. 
Expects all security equipment to bo oparablo bij 790223 ui/ 
exception of unit described in unc I, Enc 1 withheld Iref 
10CFR2. 790). 
WILLIAMS, D. H. Arkansas Poiuer & Light Co. 79/02/01. Ip. 

790aOB0193 DOCKET SO-313 Arkansas Nuclear One, Unit 1 

ForuarSs sketch showing typicat locking tab used to lock 
globe valves for throttling rp design of ECCB small break 
long-term mod. 
WILLIAMS, D. H. Arfransnu POUJBT fc Light Co, 79/02/01. 2pp. 

7903330166 DOCKET 30-313 Arkansas Nuclear One, Unit 1 

Informs of completion of Phase 1 of- asymmetric LCCA Inads 
program. Submits plan for Phase 3^ "B (. W Fuel Aaaombly Diunors 
Group Aaymmetric LDCA Loads Evaluation Program, Phase 3." 
Utll is evaluating inclusion of seismic load info. 
RUETER.D. rt. Alabama Payer Co. 79/03/O2. lOpp. 



79O2B00071 DOCKET 90-31S Rancho Beco Nuclear Oeneratino Station 
On 7B1213 while plant uan in refueling shutdouin, "D" decoy 
heat sys uaa started. Due to incomplete valve line-up, pump 
uas started u/suction valve from borated mater storage tank 
closed, resulting in sijs stress in form of water hammer. 
MATTIMOE, J. J. Sacramento Municipal Utility District. 79/01/03. 
3pp. 



790S2OO07O DOCKET 50-312 Rancho Seco Nuclear Generating Station 
RO 79-1 on 7901O3: reactor trip occurred simultaneously 
U/IDSB of non-nuclear instrumentation for p Ian. d cooldoiun 
rate at times eicaaded max permi Esl b 1 B rate. Trip ft cooldoun 
transient are under InveBtiflatio-n. 

ROBfllOUEZ.R. J. Sacramento Municipal Utilitu District. 79/01/03. 
Ip. 

79030aOH07 DOCKET 50-312 Rancho Seco Nuclear Generating Station 
Forwards LER 79-001/01T-0. 

MATTIMDE, J. J. Sacramento Municipal Utility District. 79/01/26. 
3pp. 



7902350001 DOCKET 30-313 Arkansas Nuclear One. Unit 1 

Forwards justification for proposed reduced pressure testing 

of containment isolation valves in response to 79O1I9 

tel ephono c o-nversat J on. 

RUETER.D.rt. Arkansas Pouer & Light Co. 79/02/09. ipp. 

7903230003 DOCKET 3O-313 Arkansas Nuclear One* Unit 1 

Responds to 7B11 IS Itr. Will submit rmueflted "Radiological 
Tech Speca" by 7903O1 instead of 79O213 to allow time for 
adequate revieu. 
HUETEH.D.A. Arkansas Poiuer & Light Co. 79/O3/09. Ip. 

79Q2220QB9 DOCKET 50-313 Arkansas Nuclear One, Unit 1 
Forward s 1& photographs of cable spreading room t 
description which provides info on existing heal loads. 
Interested in tests involving cable spreading room deluge 
aya. 
flUETEH, D. A, Arkansas Poiuer !. Light Co. 79/02/12. 3pp. 

7903230313 DOCKET 50-313 Arkansas Nuclear One. Unit 1 
Forwards proposed change to Tech Spec 4. 2-. A re Insp of 
reactor coolant pump motor f lijiuh ee 1 s, in/one 1 required Fee. 
CAVANAUSH, U, Arkansas Pouer d Light Co. 79/C-a/25. 9pp. 



60 



DOCKETED ITEMS 



DOCKET 30-313 Arkansas Nuclear One, Unit 1 
Forwards IE Injp Rents 50-313/70-19 (, 50-3iS/7B-26 on 
791023-1119 * notice of violation. 

MADSEN.Q L Region 4. Dallas, Office of the Director. 7B/I2/14. 

2pp 



7903260565 DOCKET 50-315 Donald C. Cook Nuclear Power Plant. Unit I 
Finds fire protection program adequate for present. Mod If i ed 
program mill meet guidelines in App A to Branch Technical 
Position 9, 5-1. 
* Assistant Director for Plant Ego terns 70/03/20 



7902O>OI21 DOCKET 30-313 Arkansas Nuclear One, Unit 1 
Notice of violation fron imp on 7B1023-1119. 
. Region 4, Dallas, Office of the Director. 78/12/14 



7902090123 DOCKET 50-313 Arkansas Nuclear One, Unit 1 

IE Imp Rupts 50-313/7B-19 !, 50-36B/78-2i on 781033-1119. 

fJoncomp 1 lance noted, nonfunctional penetration fire harrier 

in 2A3 suitchgear room f. quorum not formed according to Tech 

Spues. 

* Region 4, Dallas. Office of the Director. 70/12/14. 30pp. 



7903320119 DOCKET 50-313 Donald C. Cnok Nuclear Powor Plant, Unit 1 
Informs that TRADOC Pamphlet 390-30. " Intersnrvl co Procedures 
for Initruc tional Sys Development" referenced in NUREQ-QSt7 

ia available in microfiche form from NRC, 
DESAW, H. J. Division of Document Control. 77/01/09, Hpp. 

7903130195 DOCKET 90-319 Donald C. Cook Nuclear Pouer Plant, Unit 1 
Modified amended security p lam contents withheld 
(ref 10CFR2. 790>. 
Indiana & Michigan Power Co, 79/01/30. Ip. 



7902260017 DOCKET 50-313 Arkansas Nuclear One, Unit I 
Forwards IE Insp Repts 50-313/73*21 6 50-36B/7B-2B on 
7B113O-I217 >., notice of violation. 

MADSEN. G. L Region 4. Dallas, Reactor Operations Nuclear Support 

Branch. 79/01/05 2pp. 

790326001? DOCKET 50-313 Arkansas Nuclear One. Unit 1 
Notice of violation from insp on 7B1 130-1217. 

Region 4, Dallas. Reactor Operations Nuclear Support Dranch 

79/O1/04 3pp. 

7503360023 DOCKET 50-313 Arkansas Nuclear One, Unit 1 ' 

IE Inap Repts 30-313/7B-21 6 SO-3i,B/78-2a on 7B112O-1217. 
Noncompliance noted: surve I llance testing t, calibr records 
tJESTEBMAN, T. F . VERDUZCD, G. H. . MADSEN.G.L. Region 4. Dallas, 

Reactor Operations Muelear Support Dranch. 79/O1/04. 17pp. 

7902010315 DOCKET 50-313 flrtflnsas Nuclear One, Unit 1 

Fcruardi IE Circular 79-02. "Fai lure of 120 Volt Vital AC 
Poaier Supplies " 

5EYFRIT.K. v Region 4. Dallas, Office of the Director 79/01/14 

7pp. 

7702ZB0155 DOCKET 50-313 Arkansas Nuclear One, Unit 1 

Forward's IE Info Notice 79-01, "Dergen-Paterson Hydraulic 

Shock t, Sway Arrestors (HSSA). " 

5EYFRlT,K.v. Region 4. Dallas, Office of the Director. 79/02/O2, 

7902220461 DOCKET 50-313 Arkansas Nuclear One, Unit 1 

Fnruards IE Bulletin 79-O1. "Environ Qualification of Class 

IE Ejuipmsnt. U/list of 11 s^tematic evaluation program 

plants for which no action is required 

BEYFRIT.K.v. Region 4, Dallas, Office D f the Director. 79/03/08. 

79022BOO]* DOCKET 50-313 Arkansas Nuclear One, Unit 1 

L^rS'-IV,"'!! N titB 7r> ' 3 ' " L " r "*"1 valve Geared 
Limit Switch Lubricant " 

SEWBIT.K.V. ftsoiDn 4 , Oallas . , ^ Director . 



7902QB024* DOCKET 50-313 Arkansas Nuclear One. Unit 1 
Forwards "Fourth Ou.rt.r, 197B Nat) Pollutant Discharge 
Elimination But Hept for Natl Pollutant Discharge 
fcltmination Sys Permit AR0001392 " 
WILLIAMS, D.H. Arkansas Power 6 Light Co. 79/01/31. 10 PP . 



FO m 

RUETER n o S t Opfiratin 9 "P* 'OP Jan 1979. 
RUETER.D.fl Arkansas Po^er C, Li S ht Co. 79/03/13. Ip. 

7902220070 DOCKET 30-3 I3 Arkansas Nuclear Dne, Unit I 
Monthly operating rept for Jan 1979 
SHIVELV.C.N. A^ansas P DlJ er (, Li,ht Co. 79/03/13. 5pp, 

79022S0270 DOCKET 30-313 Arkansas Nuclear One, Unit 1 

-rr;;'*"^ 1 of intflke ^i-.....^!;.^; 

RUETER.O.A. Arkansa, P OU er !, Light Co. 79/03/21. 17pp 

7902200013 DOCKET 30-313 Arkansas Nuclear One U nif , 
Forwards LER 79-001/Q3L-0 """ear One, Unit I 

RUETER.0.A. Arkansas P OU er J, Light Co. 79/03/O9. Ip. 



One. UnU 



tricting air flou A-30D callap*ing 

N. Arkansas Po.er t L ighl Co. 79/01 /la. Ip. 



from 



7902120067 DOCKET 50-313 Donald C, Cook Nuclear Pawur Plant, Unit 1 
Responds to NRC 7BQ4Q7 Itr requesting addl inf o. Foruards 
revision to App li of modlPied amended security p Ian, Provi doo 
justification for non-inclusion of certain safotu-ro lated 
equipment. Attachment withheld (ref lOCFDH. 790) , 
MALONEY.O.P. Indiana t, Michigan Pouior Co, 79/03/Oa. 2pp. 

7902360179 DOCKET 30-313 Donald C, Cook Nucloar Pouer Plant. Unit 1 
Forwards copy of reaponse to App A Dranch Technical Position 
9.5-1 as requested in 760716 (, 760730 1 trs. H/BIIC 1 proposed 
Tech Spec for fire protection BUS for Unit 1 as rooueBtnd in. 
760930 Itr. 
TILLINGHA8T, J. Indiana t, Michigan Power Co. 77/01/31, S9pp. 

79022604B3 DOCKET 30-315 Dunflld C. Cook Nuclear Pouar Plant, Unit I 
Forwards firE haiards analyst s. Analysl n t, 770131 submittal 
provids complBtB evaluation of fire protection for facility 
Indiana !. Michigan Pouior Co. 77/03/31, Spp 



HALONEY, 0. P. 



7903260491 DOCKET 30-315 Donald C, Cook Nucloar Power Plant. Unit I 
Fire haiard analysis for f ac 1 1 i ty. Shouis that fire protection 
program either meets, oicoeds or requires modn to assure that 
fire uiill not aCfoct ability to bring plant to safe 
shutdown. 

SX*,2 lJ -' DEL PERCIO ' J 0. Indiana b MUhl n Pouer Co. 
77/03/31. 361 pp. 

7903360494 DOCKET 30-315 Donald C. Cooh Nuclear Power Plant, Unit 1 
Forwards summary of 770511 presentation to NfiC uihich 
answered questions arising from 770119-23 fire prolsctlon 
site visit. 
TILLINOHAST. J. Indiana (. Micliigan Power Co. 77/06/01, I8pp, 

7902360499 DOCKET SO-318 Donald C. Cool. Nucloar Pouer Pl.nt, Unit 1 
Forwards request for addl Info re flro protection prooram. 
Response revested by 770729 t, should include de.criptlon of 
rac 1 1 tcy mad s, 
KNIEL.H. Light Water llBactors "ranch 2. 77/07/11. Hipp, 



anala C ' C 011 Nut1 -""- P"r Plant, Un 
f ir ? '" Dtoc *""' Progr- in ro.pons- to 



coll^ n """'"^th.r W/770B19 response, compr i.e. 

T?M P !2 4 ; ( 1"" f ''P'"'"* *" NJ1C 770711 Itr. 

riLLINOHABT. J. Indiana (< Michigan Power Co. 77/07/30. 3Spp. 

7902260333 DOCKET 50-313 Donald C. Cook Nuclear Power Plant, Unit 1 
Supplements 770S19 t, 770930 lira by providing addl info in 

- 



TILLINOHAST, J, Indiana !, Michigan Pnwer Co. 77/11/32. SHpp. 

7903260330 DOCKET 30-313 Donald C. Cnok Nuclear Powsr Plant, Unit 
!t P .tor i i M " 04 . fll " tingi WUt11 U ""v. r : B n ng' ""** 

: " -i:^ piI -" m " " 



""' 



NUel " 



"aaSBd'on review f ^" 

;;j ; S: T! ; for - 

\ P S V? D r anch T"""*"! Pit n i. 

L. ftsBlstant Director For Plant 9.te ms , 79/03/Ba, 






TIUINOHABT.J. 



Michigan Power Co. 79/01/26. 6pp. 



DOCKETED ITEMS 



61 



7903260346 DOCKET 5O-315 Donald C. Coot Nucleai- Power Plant, Unit 1 
Amend 7 to Indemnity Agreement B-61. 
HALTZMAN, J. Antitrust (c Indemnity Group. 77/12/23. 1pp. 

7903260916 DOCKET 50-313 Donald C. Cook Nucloar Power Plant, Unit 1 
'Forward! copies of info relating tq remote sftutdoiun 
capability, for distribution to c nmmi ttoe. Info abstracted 
tram submittals made in conjunction m/flre protection review 
& operating license review of Cook Units l&a. 
DAVIS, D. K. Operating Reactors Oranch S. 77/1O/21. 12pp. 

79022B03B5 DOCKET 30-315 Donald C. Cook Nuclear Power Plant, Unit 1 
As followup to NRC 701113 reque B t far submittal of Offsite 
Date Calculation Manual for flpp roval. f orwardu guidelines for 
flenoral contents of manual. 

S!H?!'.5 lK< ^"iitant Director for Engineers t, Projects 

7T/Q1/10. 5pp. 



7902000173 DOCKET 3O-31S Donaltl C. Cook Nuclear Power Plant, L 
Forwards "Special Hep tj Saf etu Injection 11" re 7B01 !4 
occurrence- resulting from operator error. Major components I. 
functions were reviewed li found tn be in good order, Tuiu 
previous rapt u/nou rcpt numbers end. 
SMALLER, . V. Indiana & Michigan Pouier Co. 79/O1/33. 7pp. 



7902130161 DOCKET 3O-319 Bonald 
Forwards LER 79-OOi /Q3L-O, 
SMALLER, D.V. Indiana !< Michigan Poye 



Cnok Nuclear Pouar Plant, Unit 1 



Cn. 79/O2/09. Ip. 



7903130164 DOCKET 30-315 Donald C. Cook Nuclear Power Plant. Unit 1 
LER 79-OO1 /03L-0 on 790123: duri nj Mode 1, position of Hod F-6 
showed deviation of greater than 13 step* from demand 
position. Caused by drift in signal conditioning module. 
BEILMAN. T. P. Indiana tt Michigan Power Co. 79/O2/O9. lp. 



79020202SB DOCKET 30-315 Donald C. Cook Nuclear Pouer Plant, Unit 1 
Discusses concerns re reanalysis baaed on Hestinghouse ECCS 
valuation model for 13*13 West innnouso fuel. Prosant Fa 
limit of 1.90 remains conservative value applicable to f uo 1 , 
until fuel is removed during Apr 1979 outage 
TILLINOHABT, J. Indiana K Michigan Power Co. 79/01/24. 3pp. 

7902060220 DOCKET 50-313 Donald C. Cook Nucloar Power Plant- Unit 1 
Provides addl info re spent fuel storage capacity in 
rejponn tu NRC 790102 request. Di Bcusses distribution of 
lies t, median all? of boron carbide partUlea in boron 
plt, b venting of stainless steel envelopes 
TILLINOHA3T, J. Indiana (. Michigan Power Ca. 79/01/24. llpp, 

7903360449 DOCKET 5O-313 Donald C. Cook Nuclear Power Plant, Untt 1 
Util response to App A of Branch Technical Position 
9. 5-1. Presents results of exam of existing fire protection 
praoT-am based on guidelines. 
rjALEY.R.J., DEL PERC10, J. O. Indiana * Michigan Power Co. 77/01/31 



7902S60SS1 DOCKET 3Q-319 Donald C. Cook Nuclear Power Plant, Unit 1 
Draft of Itr forwarding amends to DPI1-74 t, DPR-5B. Amends add 
condition relating to racilitu. mo-d for fire protection Draft 
amend, safety evaluation t, notice of insuancp end, 
BCH14ENCER, A. Operating Reactors Branch 1. 79/O2/2A. 31pp. 

7902260113 DOCKET 30-313 Donald C. Cook Nuclear Power Plant- Unit I 
Forward* IE Insp Repts 5O-31S/7B-33 t, 30-31 6/7B-36 on 
791211-13. No noncomplianco noted, 

in 3 ' Ctllcafl0< " eal:tl "- Operotion H Nuclear Support 



7-?Oaa60131 DOCKET 5O-315 Donald C. Cook Nuclear Pousr Plant, Unit 1 
IE Imp Repts 30-319/78-33 & 50-316/79-36 on 7B1211-13,No 
noncompl ianco noted, Major areas inspected: r equal if i cat ion 
training, core power distribution 1 imi ts, thermal pouer 
evaluations tc target ailal flui difference calculations 
HftSHE.R.E., DANIELS. F. T. , LITTLE, U.S. Region 3i. Chicago, 

Reactor Operations Nuclear Support Branch. 79/01/OB. 4pp, 

790B13Q070 DOCKET 30-319 Donald C. Coo* Nuclear Power Plant, Unit 1 
Submits guidance re retention of dally survey records, 
subjact of deficiency in IE Insp Rapt 50-313/76-11. 
DAVIS, A. B. Region 3- Chicago. Fuel Facility d Materials Safety 

Branch. 79/01/31. Hpp. 

7902120063 DOCKET 30-313 Donald C. Cook Nuclear Power Plant, Untt 1 
Forwards IE Info Notice 79-01, "Beraen-Patofnon Hydraulic 
Shock (. Quay Arrestora fHBBA)". 
KEPPLEF?, J. Q. Reoion 3, Chicago, Office of the Diroctor, 79/02/02 



7903320134 DOCKET 5O-313 Donald C Cook Nuclear Power Plant, Unit 1 
Forwards LER 79-OOE/O3L-0. 
BHALLER.D. V. Indiana & Michigan Power Co. 79/Q2/13. lp. 

7902aa015B DOCKET SO-31B Qonald C. Cook Nuclear Pouior Plant. Unit 1 
LEU 79-OO2/03L-0 on 79O11H: Following boric acid injection, 
alia] flui diffBi-oncB eicceadeet Tech Spec limit. Cause 
unknown. 
BEILMAN.T.P. Indiana !r Michigan Power Co. 79/02/13. lp. 

790&3603t,3 DPCKET 50-31^ Donald C. Cook Nuclear Power Plant. Unit 3 
Finds fire protection program adequate for present It u/mods 
will meet guidelines in App A to Branch Technical Position 
9. 5-1. 
* Assistant Director far Plant Systems. 78/03/29. 3flpp, 

7902260179 DOCKET EO-3I& Donaltf C. Cook Nuclear Power Plant, Unit 3 
Forwards cnpy oP response to App A Branch Technical Position 
9.3-1 as requested in 76O716 i, 7A0730 1 trs. H/enc 1 proposed 
Tech Spec for Pire protection sgs for Unit I as Teauesteo 1 in 
760930 Itr. 
TILL1NOHABT. J. Indiana t. Michigan Power Co. 77/01/31. 23pp. 

7902260483 DOCKET 50-316 Donald C. Cook Nuclear Power Plant, Unit 2 
Forwards fire hazard* ana 1 ijsi s . Submi tta 1 of 770131 together 
w/attat bed rept provides complete evaluation of fire 
protection for facility. 
MALDNEY.Q. P. Indiana & Michigan Pouier Co. 77/O3/31. 2pp. 

7902260191 DOCKET 30-316 Donald C, Cood Nuclear Pouier Plant. Unit 3 
Fire haiard analysis For f aci 1 1 ty. 9hauis that fire protection 
program either meets, exceeds or requires mods to assure that 
fire will not afPeet ability to bring plant to safe 
shutdown. 
DrtLEY.n.J. Indiana (j Michigan Pouier Cn. 77/03/31. 361pp. 

790S260494 DOCKET 5O-316 Donald C. Cook Nuclear Poiuc-r Plant, Unit S 
Forwards sufnmarii of 77O91 1 presentation to NFIC staff wM c h 
answered questions arising from 770417-E3 fire protection 
site visit. 
TILL1NGHAST, J, Indiana I. Michigan Pouior CD. 77/06/01. IBpp. 

7903260499 DOCKET 30-316 Donald C, Cook Nuclear Power Plant, Unit H 
Forwards request Por addl info re flra protection program. 
Response requested by 770729 (, should Include description of 
facility mods required to Implement positions. 
KN1EL.K. Light Water Reactors Branch S. 77/O7/11. 24pp. 

7902260303 DOCKET SO-316 Donald C, Cook Nuclaar Power Plant. Unit 3 
Forwards addl Info re fire protection pi-ogr-am in response to 
NHC 770711 request. Ma implementation schedirle Is available 
MALONEY.O. P. Indiana t Michigan Pouier Co. 77/fla/i9. 3pp. 



790B21O1B3 DOCKET 30-313 Donald C, Cook Nuclear Power Plant, Unit 1 
Forwards IE Bulletin 79-O1, "Environ Qualification oP Class 
IE Equipment." U/llat at tl systematic evaluation program 
plants far which no action is required. 

KEPPLER.J.O. Region 3- Chicago, Office of the Director. 79/03/09. 

lp. 

7902270324 DOCKET 30-313 Donald C. Cook Nuclear Pou/er Plant, Unit 1 
Fpruiards IE Info Notice 79-O3, "Limitorque Valve Geared 
Limit Switch Lubricant." 

KEPPLER.O. 0. Region 3, Chicago, Office af the Director. 79/02/O9. 

lp. 

7702220043 DOCKET 30-313 Donald C. Cook Nuclear Power Plant, Unit 1 
Forwards monthly operating rept for Jan 1979. 
SMALLER. D. V. Indiana t, Michigan Poujer Co. 79/02/12. tp. 

7W2220046 DOCKET 5O-313 Donald 'C. Cook Nuclear Power Plant, Unit 1 
Monthly operating rept for Jan 1979. 
OILLETT.H. T. Indiana !< Michigan Power Cn. 79/02/13. 7pp, 



7903360309 DOCKET 3O-316 Bonold C. Cook Nuclear Power Pla,nt, Unit 2 
In response to NUC 77O7 1 1 Itr, Forwards info re fire 
protection program. Together U/77O019 r esnonse, compr i ses 
complete package of responses to 77O71 1 Itr, 
TILLINQHAST, J, Indiana ft Mich.ip.an Power Co. 77/09/30. 32pp. 

7902260333 DOCKET 30-316 Ddnald C, Caok Nuclear Pomer Plant, Unit 2 
Supplements 770B19 ft 770930 Hrs by providing addl info in 
response to certain fire protection questions renulting Prom 
771103-04 meeting, 
TILLINGHABT, J. Indiana ii Michigan Power Co. 77/11/22, 22pp, 

7903360330 DOCKET SO-316 Donald C. Cook Nuclear Pouer Plant. Unit S 
Summary of 771103-01 meetings mi/uti 1 re fire protection. 
Meetings intended to resolve, remaininj staff items at 0-2 
stage of review*, permit completion of fire protection 
safety ivaluation by Dec 1977. 
NLYNCZAK.M. M. Light Hater Ra-actors Branch a. 77/11/25. 9pp. 

790S360561 DOCKET SO-316 Donald C. Cook Nuclear Power Plant, Unit 2 
DasHd on review, finds licensee's modified Fire protection 
projram adequate for pr eaent. Scheduled mod uii 1 1 meet 
guidelines of Apt A to Branch Technical Position 9. 51, 
TEDESCO,R. L. Asstatant Director for Plant Systems. 78/03/23 

2pp. 



62 



DOCKETED ITEMS 



7902120195 DOCKET 50-316 Donald C Coot Nuclear Power Plant. Unit 5 
Modified anendei scuritij p lar>; contents uithhsld 
(rf 10CFR3 790! 
Indiana >, Mulligan Pousr Co. 79/01/30. Ip. 

7903120067 DOCKET 50-316 Donald C Coot Nuclear Pouer Plant, Unit 2 
Rsjporriii Co sc 7B0407 Itr requesting addl info. Forwards 
revision to *pp B of modified amended security p Ian. Provides 
justification for nan-inclusion of certain safety-related 
quic,nnt. Attachment uithheld [ref IOCFH2. 790). 
MALONEV.O p. Indiana t, Michigan Pouer Co. 79/03/02. 2pp. 

7903260546 DOCKET 50-316 Donald C. Cook Nuclear Power Plant. Unit 2 
A.njnd 7 to Indemnity Agreement H-61. 
9ALTZMAN. J Antitrust 1 Indemnity Group. 77/12/23. Ipp, 

7902050161 DOCKET 50-316 Eonald C. Cool Nuclear Power Plant, Unit 2 
Foruaros Endorsements 9 !, 30 to HAELU Policy MF-79 t, 
Endorsements 36 fc 37 to ANI Policy NF-206. 
TILLINSHftST. J Indiana !. Michigan Power Co. 79/01/36. 6pp. 

7903360516 DOCKET 50-316 Eonald C. Cook Nuclear Power Plant, Unit 2 
Forwards copies of info relating to remote shutdown 
capability, for distribution to committee. Info abstracted 
from lubmiltals nade in conjunction w/fire protection review 
6 operating license review of facility. 
DAV1S.DK Operating Reactors Branch 3. 77/10/21. 12pp. 

7903360449 DOCKET 50-316 Donald C. Cool Nuclear Power Plant, Unit 2 
Util response to App A of Branch Technical Position 9 5-1 
Presents results of e,an of eiisting fire protection program 
based on guidelines. 
DALEY, R J. Indiana J. Michigan Power Co. 77/01/31. 102pp. 



ense DPFI-74. 



* Kn * ponald c ' Cook 

"Dtirjcation that Commission has issue 

Authorlies operation at 3,391 at MUt. 

DDTD,R.S Division of Project Management. 77/12/23, 3p P . 



7903360533 DOCKET 50-316 Donald C. Cool Nuclear Power Plant, Unit 
cor^n" DPR : 7 *', Uth0 : i " n9 "P'"""" "* ** *tate reac or 
nS " iB " Eli not ln elqess of 3 " 391 "' 
BOVD.P..S. Div Jslon of Project Management. 77/12/33. 13pp. 



M - 3 ; 6 , "'"-"I C Coot Nuclear Po we r P,ant, Unit 

.ratin, n' T ^" n " ""-""** '' restricted from 
op<ratino at full rated power until specified tests are 
completed. 

KHIEU.K. Light Wat B r Reactors Branch 4. 77/12/33. 3pp. 

790a2S03B5 DOCKET 5O-316 Don ald C. Coo* Nuclear Pouer Plant. Unit 2 

So 5 ,C Icufa ion "S "'I'! *">""* f " SUbmittfll " f o""- 
^"rat'^ntents o ">' ""- 5-^Hnes for 



7903260121 DOCKET 50-316 Donald C. Cook Nuclear Power Plant, Unit J 
IE Inup /lupin 50-315/78-39 & 30-316/76-36 on 701211-1,1. Ho 
noncompl iance noted. Ma jor areas inHpectodirequnlification 
training, core power distribution 1 iral ta, thermal power 1 
evaluations 5< target aiial flui difference calculation!. 
MAS6E,Ft.E., DANIELS.F. T. , L1TTLE.W.S. Region 3, ChltajB, 

Reactor Operations Nuclear Support Dranch, 79/01/OEf. "Iflp. 

7903130070 DOCKET 50-316 Donald C. Cook Nocloar Power Plant, Unit 2 
Submits guidance re retention uf daily survey rocordo, 
subject of deficiency in IE Insp Kept 30-313/70-11 

DAVIS, A. D. Region 3, Chicago, Fuel Facility !, Motci-iaU fi*ft(ij 

Branch. 79/01/31. 2pp. 

7903130063 DOCKET S0-3ii Donald C. Cook Nuclear Poiuor Plant, Unit B 
Forwards IE Info Notice 79-01, "Dorgen-Pntersun Hydraulic 
Shock t< Siuay flrrestors <H88A>". 

KEPPLER.J.Q. Region 3, Chlr.anu, OPfico of the Birettor, 79/02/0? 

'P. 

79022I01Q5 DOCKET 50-316 Donald C. Cook Nuclonr Power Pl*nt, Unit S 
Forwards IE Bulletin 79-01, "Environ dual i f i cat! on of Class 
IE Equipment. " W/list of 11 systematic ovnluatlon program 
plants for which no action is required. 

KEPPLER,J.O. Region 3, Chicago, Office of tho Dirnctoi- 79/03/0? 

Ip, 

7902370334 DOCKET 3O-316 Donald C. Cook Muclear Power Plant. Unit K 
Forwards IE Info Notice 79-03, "Limit oratio Valve Ooared 
Limit Buitch Lubricant." 
KEPPLER.J.O. Region 3, Chicago, Office of th. Director. 77/02/09. 

7903220033 DOCKET 30-316 Donald C. CooK Nuclear Power Plant, Unit S 
Forwards monthly operating rept for Jan 1979 
SMALLER, D. V, Indiana 6 Michigan Power Co. 79/02/12. Ip. 



OILLETT,W.T. Indiana 6 Michigan Pouar Co, 79/08/OS'. 13pp. 

-'-' "" " 



RISCHLIWO.J. Indiana h Michioan Power Co, 7fl/lo/a4. 



SMALLER, D.V. Indiana & Michigan Power CD. 79/01/31. i,,. 



n, . 

TILLIN.HAST.J | nd ,ana t, Michigan Pou,er Co. 79/01/34. llpp. 



ndiana Michigan P OU er Co, 79/03/06. 10pp. 



-lear Power Plant, Unit 2 
* " "" 



Michigan Power Co. 79/O2/13 H 7pp . 



equipment will 
D1SBROH.R.E. I 



ed protection 



- . 

Power Co. 79/03/16. 3pp. 



! "2; p 3 ' CI "" B0 ' Reactor Derations Nucl ear SupDOPt 



Michigan Power Co. 79/01/31. Ip 



SMALLER, D. V, Indians J, Michigan Power Co. 77/03/ 



01. Ip. 



.D.V. Indiana t, Michigan Power Co. 79/03/03, Ip. 



^K.- r- r -t. b . 

conductor "P^ator. Caused b v vibration ft u.e of so 
W1ZNER.D.O, Indiana t, Michigan P D w H r Co. 79/02/03. Ip. 



r trl ""''* '"Action 
Bflnl aH "'"'otD'-/"'aln steam 



occurre caed by 
pressure sensino ii 



c. 

J.L. Indira ft Michioan Pow 



er Co. 79/03/05. 2pp 



Indiana t, Michiflan Power Co. 79/OH/13 lp 



switches set at non "ii,. i au M uid oil pressut-e 

.::^K/n:;Kr: >-:i':ii. --; e r 

, T. P. Indiana fc Michigan Power Co. 79/02/13, a pp . 



DOCKETED ITEMS 



83 



7902220112 DOCKET 30-316 Donald C. Coot Nuclear Pouer Plant, Unit 
LER 79-Q03/03L-0 on 7901l7:solid state protection BUS tested 
unsatisfactorily. Cauaed by failure of universal logic card 



A-214. 
RI6CHLINQ, J, L. 



Indiana S. Michigan Poyor Co. 79/03/13. lp. 



7902220115 DOCKET 50-316 Donald C. Cook Nuclear Power Plant. Unit 2 
LEfl 79-QOi/Q3L-0 an 790123: BVC water supply chock valve to 
AH diesel.EBW-143, failed t-o seat. Caused by normal wear of 
split center disc of carbon steel check valve, c enter 1 ine 
part 0-10493-36. 
WIZNER.D.G, Indiana Ei Michigan Pouer Co. ,79/03/13, In 

7902330119 DOCKET 90-317 Calvert Cliff, Nuclear Power Plant, Unit 1 
Inform* that TRADDC Pamphlet 330-30, " Intarsorvlce Procedures 
for Instructional BIJU Development" referenced In NUREG-O219 
Is available In microfiche form from NRC. 
BE8AU, W. J. Division of Document Control. 79/01/09. 2pp, 

7902210201 DOCKET 50-317 Calvert CliPfa Nuclear Poiuer Plant, Unit 1 
Forwards Rsvlnlon 5 to modified amended security plan In 
response to tolephoned comments by MJ Qaitania re unresolved 
ilium. End mithhald Irof 10CFRH. 790), 
EVANB.V.R. Baltimore Gas (.Electric Co. 79/02/14. lp. 

7902260319 DOCKET SO-317 Calvert Cliffs Nueloar Power Plant, Unit 1 
In response to 790213 Itr-statea desire to initiate appeal 
process re modified amended security plans. Suggos IB 79031fl 
* date for appeal meeting. 
EVANS. V.R. Baltimore Oa s !< Electric Co, 79/02/53. lp. 

7902090S17 DOCKET 90-317 Calvert CltfPs Nuclear Power Plant. Unit 1 
Forwards Form NF-216, Endorsement 35i Form MF-7A. Endorsement 
H9i (. Endorsement S to Secondary Financial Protection EB-53, 
EB-83, XB-92 t, XB-S3. 
SHOEMAKER, C. L. Baltimore Qas t. Electric Co. 70/03/O7. lOpp. 

7902060173 DOCKET 30-317 Calvert Cliffn Hue lear Power Plant, Unit 1 
Forwards info required For review of pump Jr value inservlco 
teat program. Info includes lists of containment isolation 
valves catsgoriied AE ft AC maintained shut during operation. 
91 K oversiied drawings one! 
LUNDVALL, A. E. Baltimore Gas & EloctMc Co, 79/01/23. 70pp. 

7903060327 DOCKET SO-317 Calvert Cliffs Nuclear Power Plant. Unit I 
Requests amend to License DPR-93 re removal of unnBcossaru 
safety-related hydraulic snubbers. W/encl drawings 
LUNDvALL, A. E, Baltimore Qfli & Electric Co, 79/OI/31, 4pp, 

79022100S6 DOCKET 30-317 Calvert Cliff. Nuclear Power Plant, Unit 1 
Forwards proprietary & nonproprictary versions of high 
burnup demonstration program preented to NRC on 7B1P2Q, 
Proprietary version withheld (ref 10CFRB. 79O). H/oncl 
affidavit. 
LUNDVALL, A, E, Baltimore Oas t, Electric CD. 79/02/07. 7pp. 

79022100BB DOCKET 30-317 Calvort Cliffs Nuclear Power Plant, Unit I 
NonpronriHtary version of slides depicting Scout-1 high 
ournup dnmonstrat ion program. 
Baltimore Oas & Electric Co. 70/12/20. H3pp. 

7902110196 DOCKET 50-317 Calvort Cliff! Nuclear Power Plant, Unit 1 
Responds to NRC question TO assumption of credit for 
charging pump operation during small break UOCA analysis, 
Informs of action taken to ensure safety & meet NRC 
requirement*. Will return to stretch power operating limits. 
LUNDVALL, A. E. Baltimore Gas t. Electric Co. 79/OS/1H. 3pp. 

7902260364 DOCKET 90-317 Calvart Cliffs Nuclear Power Plant, Unit 1 
Informs of decision to return to stretch poiuer operating 
limit of 2,700 MWt t, forwards C-E analysis "Small Break ECCS 
Performance at S, 791 MWt w/o Changing Pump Flow," 
Demonstrates conformant!) w/tOCFRSO. 46. 
LUNDVALL, A. E. Daltimora Oas (< Electric Co, 79/02/16. fepp. 

7902060419 DOCKET SO-317 Calvert Cliffs Nuclear Power Plant, Unit 1 
Forwards IE Insp Repts 30-317/7B-37 & 30-318/78-33 on 
781137-1201. No noncomp 1 lance noted. 

CARLBDN.R. T. (legion I, Philadelphia, Reactor Construction !- 

Engineering Support Branch. 7S/1S/BB. app. 

7902060421 DOCKET 30-317 Calvort Cliffs Nuclear Power Plant, Unit I 
IE Insp Repts 90-317/7B-37 Jc SO-31B/7B-33 on 701 127-1SC-1. ND 
noncompl lance noted, Major areas int'p ec ted: safaty-rel ated 
equipment, fire haiards. * fire protection equipment, 
KOLTAY.P.B., EBNETER.S.D. Region 1, Philadelphia, Reactor 

Construction & Engineering Support Branch. 76/12/26. 4pp. 



7903140363 DOCKET 5O-317 Calvert Cliffs Nuclear Power Plant, Unit 1 
Ack roceipt of 7B1219 1 tr informing NRC of steps taken to 
correct violation* noted in IE Insp Rents 5O-31 7/7B-37 J, 
30-310/7B-21. 

CARLSONj R. T. Region t, Ph i Jad B lp*i ia, Reactor Construction !i 

Engineering Support Drantrh. 79/01/17. lp. 

7903110389 DOCKET 50-317 Calvert Cliffs Nuclear Power Plant. Unit 
Responds to NRC 7B1 13? 1 tr re violation noted in IE Insp 
Repts 30-317/7B-27 i. 50-3 ! B/7B-2fl. Correc 1 1 ve actions boing 
withheld (ref 10CFR2. 790) 
LUNDVrtLL, R. 



Baltimore Cas !, Electric CD. 7a/12/19 



2pp. 



7902140399 DOCKET 5O-317 Calvert Cliffs. Nuclear Power Plant, I 
Forwards IE Insp Repts 50-317/70-37 !. 50-31B/7B-2fl on 
791003-05 !< notice of violation. 

CAHLBDN.R T. Wegian 1, Philadelphia. Re-actor Construct!! 

Engineering Support Branch. 7B/1 1/39. 3pp. 



7903140399 DOCKET 5O-3I7 Calvert Cliffs Nuclear Poiuer Plant. Unit 1 
Notice of violation from inap on 7B1003-09 Being withheld 
<ref lOCFfia. 79O). 

Rejion 1. Philadelphia, Reacts 

Support Branch. 78/11/O2. Ip. 



Construction ft Engineering 



7902I1040B DOCKET 3O-317 Calvert Cliffs NuLlear Pouer Plant, Unit 1 
IE Inap Repts 90-317/78-H7 !. 50-310X7B-24 on 7B1OO3-05 
None amp 1 lane B being, withheld (ref 1OCFR2. 71O). Ha jor areas 
inspected: spec ial mark controls for fit-e prevention !. 
protection during operation. 

FINKEL,A.E., KQLTAY, P. J. . EENETER.S.D. Region 1, Ph i lad c 1 phia. 

Reactor Construction !, Engineorinff Support Branch. 7B/11/O2. 9ep. 

790209006B DOCKET 50-317 Calvert Cliffs Nuclear Pouier Plant. Unit t 
Ack receipt of 7S1E29 Itr informing NRC of steps taken to 
correct violations noted in IE Iriso Hepts 30-317/73-36 I, 
30-318/78-31. 

SMITH. 0. M. .Rooion 1, Ph i lad alph i a, Fuel Facility !, Materials 

Safety Branch. 79/01/23. 2pp. 



Unit 1 



79020B0074 DOCKET 50-317 Calvert Cliffs Nuclear Pouier Plant, 
Responds to NrtC 7B131S Itr re violations noted in IE Inso 
Rept 30-317/78-36 t. SO-3IB./7B-21. Correc tlv actions- 
re instruc t IOTI of radiation safety f. chemistry personnel !. 
posting af radioactive matla storage areas. 
LUNDVALL,A. E. Daltiraoro Dan t, Electric Co. 7B/12/29 4p 



79020B0078 DOCKET 50-317 Calvert Cliffs Nuclear Power Plant, Unit 1 
Forwards IE Insp Repts 50-317/78-36, S* 5Q-318/7B-21 an 
7B0913-19 & notice of violation. 

SMITH, 0,H. Region 1, Philadelphia. Fuel Facility & Materials 

Safety Drantli. 7B/1S/1S. 3pp. 



79oaoaooas DOCKET 50-317 Calvert cuffs MI/CI 

Notice of violation tram insp on 780913-15 

Region 1, Philadelphia. OFfice of the Director 

3pp. 



Pouier Plant, Unit 1 
78 / 12/O7. 



790SOBOOB9 DOCKET BO-317 Calvort Cliffs Nuclear POWBT Plant, Unit 1 
IE Imp Repts BO-317/7B-3(b S, 30-310/73-31 on 700913-15. 
Noncompliance noted ; Failure to perform surveiji in accordance 
W/10CFR20, 201, paragraph 6j Fai lure to control high radiation 
arffas & failure to post radioactive matls area, 

WHITE.J.R., CLEMONS.P, Region 1. Philadelphia, Office of the 

Director. CHOCKER, H. M, (lesion 1, Philadelphia. Fuel Facility 

Materials Safety Branch. 7B/I3/07. 1,3pp. 

7902130023 DOCKET 3O-317 Calvert CJ i f Fs Nuclear Poner PSant. Unit 1 
ForuiariJfl IE Info Notice 79-01, "Bergen-Paterson Hydraulic 
Shack 6 Bufly rtrrestors (HSSA)." 

BRIER, B. H. Region 1, Philadelphia, Office of the Director 

79/02/03. 3pp. 

79DSaB04Ba DOCKET 30-317 Calvert CHffs Nuclear Pouier Plant, Unit 1 
Forwards IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment." H/list of 11 systematic evaluation proarain 
plants for uhtch no action is required, 

ORIER.B.H. Region 1, Philadelphia, Office of the Director 

79/03/03. IP. 

7902270392 DOCKET 50-317 Calvart Cliffs Nuclear Power Plant, Unit I 
Forwards monthly operating ropt for Jan 1979. 
MERSONi S. B. Baltimore Oa s 8, ElacUic Co. 79/OS/15. lp. 

7902370397 DOCKET 30-317 Calvert Cliffs Nuclear Power Plant, Unit J 
Monthly operating rept for Jan 1979. 
MERBDN, B. D. Baltimore Gas !i Electric Co, 79/02/13. 17pp 



79020102&B DOCKET 9O-317 Calvert Cliffs Nuclear Pouer Plant, Unit 1 
Forwards IE Circular 79-02, "Fai lure of ISO Vnlt Vital AC 
Poiuer Supplies. " 

OR1ER,B.H, Region I< Philadelphia, Office of the Director. 

79/01/16. Bpp. 



79021301&S DOCKET 90-317 Calvert Cliffs Nuclear Power Plant, Unit 1 
Forward! LER 78-O96/OflT-0. 
RUSSELL, L. Q, Haltlmore Oas !< Electric Co. 79/OS/OA. Ip. 



64 



DOCKETED ITEMS 



7902130106 DOCKET 50-317 Calvert Cliffs Nuclear Pouer Plant, Unit 
LER 7a-OS4>/04T-0 on 791221 oyster samples showed AG-llOm at 
81 plus or minus UK pCi/kg !< background location Ag-llOm at 
less than 7 pCi/fcg.More sensitive technique has reduced MDL 
value from 4C pCIVIi-g. but npu background value is eiteoded. 
EHERTS,R.F Baltimore Ga 3 t. Electric Co. 79/01/01. 3pp. 

790223003i DOCKET 5O-3I7 Calvert Cliffs Nuclear Power Plant: Unit 1 
LEO 77-O01/OIX--0 on 79O209 during normal operation, 
determined th.at license submittal for operation at 2, 7OO NUt 
failed to indicate that credit for one charging pump was 
taken in small break LQCA analysis Cause Forthcoming. 
CARF1DLL, J Baltimore Gas !. Electric Co. 79./02/12. Ip. 



7903260415 DOCKET 50-317 Calvort Cliff 
Forwards LER 79-Q02/O3L-0. 
RUSSELL, L E Baltimore Gas & Electri 



Plant, Unit 1 



7702360422 DOCKET 5O-317 Calvert Cliffs Nuclear Pnuier Plant. Unit 1 
LER 79-Q02/03L-0 on 79O20B: 9 lant computer fa i 1 ed. caus ing 
loss of control element assembly pulse counting circuit 
indication* fat led again nn 790212. Caus ed bg problem m/pouer 
supp )u connec tions. 

DAVIS, S.M., ROMNEV,HM. Baltimore Gas t, Electric Co 79X02/23 
2pp 

7903310201 DOCKET 50-313 Calvert Cliffs Nuclear Power Plant, Unit S 
Forwards Revision 9 to mollified amended security plan in 
response to telephoned comments bu MJ Qaitanis re unresolved 
ISBU-PB End withheld tret 10CFf!2. 79O) . 
EVANS, v.fi. Daltimore GBE !. Electric Co. 79/O2/H In 

7902260319 DOCKET 50-318 Calvert Cliffs Nuclear Power Plant. Unit S 
In response to 7-50313 Itr. states desire to initiate appeal 
proceas re modified amended security plans, Sugg outs 79O314 
as date For appeal meeting. 
EVANS, V. U. Baltimore Oas 5. Electric Co. 79/O2/23. Ip. 

7902090217 DOCKET 50-31H Calvert Cliff* Nuclear Pouer Plant, Unit 3 
Forwards Form MP-214, End orBeracnt 35; Form MF-76. Endor sement 
27; & Endorsement 2 to Secondary Financial Protection ED-SB, 
EH-53, XG-52 j, XQ-53. 
SHOEMAKER, C. L_ Baltimore Oas t, Electric Co. 7O/O2/07. 10pp. 

7902060173 DOCKET 50-31B Calvert Cliffs Nuclear Power Plant, Unit 2 
Forward* InFo required for review of pump A value inservice 
test program. Info includes lists of containment isolation 
valves categoriied AE t. AC maintulned ihut during operation 
Bit overs! led drawings end. 
LUNDVALL.rt E. Baltimore Gas Electric Co. 79/O1/23, 70pp. 

7902120157 BQCKET 3Q-31B Calvert Cliffs Nuclear Pctuiar Plant, Unit 2 
Forwards results of startup testing for Cycle 2, eomp 1 e ted 
790113. AH test results njsre within acceptable limits. 
LUNDVALL.A. E. Qaltimopc Qa 5 (. Electric Co 79/02/05 Ip 



79Q312015B DOCKET SO-318 Calvert Cliffs NLjcl 
h 'Sunmaru af Startup Testing For Cycle 2." 
* Baltimore Oes i. Electric Co, 79/O2/05. 



ar Poiuer Plant, Unit 2 
7pp 



790314019*. DOCKET 50-318 Calvert Cliffs Nuclear Pouer Plant, Unit 2 
Jtesponds to NffC question re assumption of credit for 
charging pump operation during small break LDCA analu/sin 
InFoj-ras oF action taken to ensure safety t< meet NRC 
requirements. Will rqturn to 3tre-tch pouer operating limits 
LUWDVALL, ft. E. HaStimore Was i Electric Co 79/02/12. 3pp. 

79022^0364 DOCKET 5O-319 Calvert Cltff s Nuclear Pnuer Plant. Unit 2 
Informs of deiision ta return to stretch pouer operating 
limit of 2,700 MWt !< foriuards C-E analysis "Small Break ECC3 
Performance at 3,794 MWt u/o Chanoing Pump Flou. " 
Comonslrate'E conFormartcs ia/ 10CFR50. 46. 
UUWQVflLt-.A. E. Daltimoro Gac ft Electric Co, 79/03/16. 6pp 

7902050001 DOCKET 30-31S Calvert Cliffs MueUar Pnwer Plant, Unit 2 
Foj-uards IE Inap Flept 50-318/79-23 on 7QO9SA-39 No 
none amp ] iatice noted. 

" hl - 



790MS0003 DOCKPT 5O-319 Calvert Cliffs Nuclear Pouer PJ.nt, Unit 2 
IMP "^t SO-31B/7B-23 on 7B092t,-29. No noBConpH.ne* 
noted- Major areas inspi-c ted: ac t! vi ties associated u/ 
refueling d mod oF fuel asaemhlu guide tubes 

JnHHBDN,D.F.. FEK..R.. KEIMHS.H.F. Region I, P h i ] adelph, a. 

Reactor Operations Nuclear Support Branch. 73/10/13. 6pp. 

7902060419 DOCKET 50-318 Calvert Cliffs Nuclear Pouar Plant, Unit 2 
Foruat-d, IE Insp nepts 50-317/79-37 fc 50-319/79-33 on 
7B1127-I20J. Wo nonc.ompIJan,CB notud 

CARLBDN.R.T n B r,ioni, Plii lad elpd (a, Reac tor Construe t i on I, 

Engineering Support Qranth 7B/IS/2H Spp. 



79020o0421 DDCHET 30-31B Calvort Cliffs Nuclear Pouer Plant. Unit 5 
IE Insp Repts 5O-317/7B-37 !. 30-318/78-33 on 78! 127-1301 . No 
noncompl lance noted. Major areas inspec ted: saf etij-related 
equipment, fire haia^ds, t, fire protection equipment. 
HOLTftY.P.S,, EQNETER.S.D. Region 1, Philadelphia. Reactor 

Construction !< Engineering Support Branch. 78/!2/2i. 4pp. 

790201036B DOCKET 3O-31Q Calvert Cliffs Nuclear Pouier Plant, Unit 2 
Forwards IE Circular 77-02, "Fa 1 1 ure of 130 Volt Vital AC 
Power Bupp 1 1 es. " 

ORIER.B. H. Reoion 1. Philadelphia, Office of the Director 

79/01/16. Bpp. 

79021403B3 BOCKET SO-318 Calvert Ciiffa Nuclear Power Plant, Unit Z 
flck receipt of 781219 1 tr informing NRC of steps taken to 
correct violations noted in IE [nsp Ropts 90-317/7B-27 !, 
SO-31B/7S-24. 

CARLSON, R. T. Region 3, Philadelphia, Reactor Construction !. 

Engineering Support Branch. 79/O1/17. Ip. 

79021403B9 DOCKET 5O-31B Calvert Cliffs Nuclear Power Plant, Unit 2 
Responds to NRC 7B1129 Itr re violation noted in IE Insp 
flepts 50-317/7B-27 t, 3O-31B/7B-24. Corrective actions being 
withheld <ref 10CFR2. 790). 
LUNBVALL.H. T. Baltimore Gaa t, Electric Co. 78/12/19. 2pp. 

7902110395 DOCKET 50-31B Calvert Cliffs Nuclear Poiuer Plant, Unit S 
Forwards IE Insp Repts SO-317/7B-27 d 50-318/78-2-1 on 
7BI003-05 {, notice of violation. 

CARL5uM.fl. T. Region I, Philadelphia, Reac tor Construction, & 

Engineering Support Branch. 70/11/29. 3pp. 

7902140399 DOCKET 5O-318 Calvart Cliffs Nuclear Power Plant, Unit 2 
Notice of violation from insp on 7B10O3-OS being withheld 
(ref 1OCFR2. 790>. 

Region 1, Philadelphia, Reactor Construction t, Ennineerinn 

Support Branch, 7B/11/02. Ip. 

790214040B DOCKET SO-31B Calvert Cliffs Nuclear Power Plant, Unit 2 
IE Insp Ropts 50-317/78-27 !. 50-310/78-24 on 781003-05. 
Noncompliancc being withheld (ref 10CFR2. 790). Ma jor areas 
inspected: special work controls for fire prevention I. 
protection during operation. 

FINKEL.AE. , KOLTAY, P. J. , EBNETER.S.D. Region 1, Philadelphia, 

Reactor Construction !, Engineering Support Branch. 78/11/02. 9pp. 

79020BOQ6B DOCKET 50-318 Calvert CHffs Nuclear Pouier Plant, Unit a 
rtcV receipt of 781229 Itr informing NrJc of steps taken to 
correct violations noted in IE Inup Rflpts 50-317/7B-3i & 
SO-31B/7B-H1. 

6MITH,C.H. Region 1, Ph i ladolph ia, Fuel Facility t, Materials 

Safetg Branch. 79/01/23. 2pp. 

7TO20B0074 DOCKET 50-31B Calvert Clifes Nuclear Pouer Plant. Unit 2 
Responds to NRC 7B1213 Itr ro violations noted in IE Insp 
f?ept 30-317/7B-36 k SO-31S/7B-21. Coifrec ti ve actions' 
reinstruction of radiation Bafety t. ichemi strij personnel t, 
posting nf radioactive matls storaj^ areas. 
I.UNDVALL. A. E. Baltimore Das d Electric Co, 78/12/39, flpp, 

79020B007B DOCKET 50-31S Calvert Cliffs Nuclear Power Plant, Unit S 
Forwards IE Insp Repts 3O-317/7B-36 . t. 50-310/7B-21 on 
780913-13 (. notice of violation. 

SMITH, e.H. Region 1, Philadelphia, Fuel Facility t Materials 

Bafety Branch. 7B/12/1H, 2pp. 

7902QBOD82 DOCKET 50-31B Calvert Clifrs Nuclear Pouer Plant, Unit 2 
Notice of violation from Inap on 78U913-13. 

Region 1, Philadelphia, Office- 1 of the Director 7S/1B/07 

3pp. 

79020BOOB9 DOCKET 30-318 Calvert Cliffs Nuclear Power Plant, Unit 2 
IE Insp Repts 30-317/7B-36 !. 30-318/7B-31 on 7S0913-15 
Noncorapllance fioted: Pal lure to perfiorm surveys in accordance 
[U/10CFRHO. 201, paragraph 61 failure t.o control high radiation 
areas & failure to post radioactive' matl B area. 

WHITEiJ.R., CLEMONS,P. Region 1, Philadelphia. Office of the 

Director. CROCKER, H. W. Region 1, Philadelphia, Fuel Facility t 

Materials Safety Branch. 7B/1B/07 13pp. 

7902130023 DOCKET 50-31B Calvert Cl i Pf i, Nuc 1 ear Power Plant, Unit 3 
Forwards IE Info Noticn 79-0!, "BergerPaterson Hydraulic 
Shock <i Suiay Arrestors fHSSA), " 

ORIER.S.H. Region I, Philadelphia, Office oF the Director 

79/02/02, 2pp. 

7902230483 DOCKET 30-31B Calvert Cliff., Nuclear Power Plant, Unit S 
Forwards IE Bulletin 77-01, "Environ Qua! i Fl cation of Class 
IE Equlpmnnt. " W/list of 11 systematic evaluation program 
plants for which no action is required, 

GHIEH,u,H. Region 1, Philadelphia, Office of the Director, 

79/03/OB. IP. 

7903270392 DOCKET 50-318 Calvert CliffW Nuclear Pouier Plant, Unit 2 
Forwards monthly operating rept for Jan 1979. 
MERS-QN, S. D. Daltimore Gas !, Electriu Co. 79/03/15. Ip. 



DOCKETED ITEMS 



SB 



79OS270397 DOCKET 50-31G Calvert Cliffs Nuclear Power Plant, Unit 2 
Monthly opBrating rept for Jan 1979. 
HERSDN.S.D. Baltimora Gas S. Electric Co. 79/OS/15. 17pn 

79020101BO DOCKET 3O-31B Calvei-t Cliffs Nuclear Pouer Plant, Unit 2 
Forwards LER 79-001 /03L-0. 
HUSBELL, L D Baltimore Gas i. Electric CD. 79/01/24. Ip. 

7902010182 DOCKET 5O-31B Calvert Cliffs Nuclear POUJET Plant, Unit 2 
LEO 79-OO1/O3L-0 on 7901 O6: flicessi VB reactor coolant ays 
unidentified leakage. Caused by cracked meld on socket dteld 
downstream of second Isolation valve. Study planned to 
propose design changes to correct fatigue problem. 

DAVIS, 8. M. . WATKINS, K. S. Baltimore Gas t< Electric CD. 79/01/24. 
3PP. 



79O2OS0191 DOCKET 9Q-31B Calvert Cliffs 
Foruards LER 79-003/O1T-D. 
RUSSELL, L. D. Baltimore Qa 5 t. Electrii 



Nuclear POIUOT Plant, Unit 2 



79O20BQ196 DOCKET 30-318 Calvort Cliffs Nucleor PoLier Plant. Unit 2 
LEfi 79-OQ3/Q1T-0 on 790120: during normal operati on, S2A lower 
Baal temp alarm uias received ti HCS leak rate incraased. 
Cauied bij cracked tueld on 23/\ lower seal pressure sensing 
lino. Design change is in progress. 

CARROLL, J. It. , WATKINS.S. Daltimore Gas t, Electric Co, 79/02/O1. 
Spp. 

79O213010S DOCKET 50-3IB Calvert Cliffs Nuclear Power Plant, Unit 2 
Forwards LER 7B-03A/04T-Q. 
RUSSELLiL.B. Baltimore Gas !< Electric Co. 79/02/06. lp. 

7902130106 DOCKET 50-31B Calvert Cliffs Nuclear Power Plant, Unit 2 
LER 7B-05t>/O4T-0 on 7B1321 : oyster samples showed A8-llQm at 
81 plus or minus 1 1 'A pCi/kg ( background location Ag-HOm at 
less than 7 pCi/kg. More sensitive technique has reduced MDL 
valuo from '10 pCI/kg,but neui background value is eiceedBd. 
EHEItTB.R.F. Daltlmoro Gas & Electric Co. 79/01/04. 3pp. 

79Q2260296 DOCKET 90-31B Calvert Cliffs Nuclear Power Plant, Unit S 
Forwards LER 79-QOfl/O3L-Q. 
RUSSELL, L. B. Baltimore Gas & Electric CD. 79/02/32. lp. 

7902360301 DOCKET 50-31B Calvert Cliffs Nuclear Power Plant, Unit 2 
LER 79-004/03L-0 on 770127: durlnfl routine startup of 
auxiliary Feedpump, throttle valve 'uiould not reset. Caused by 
disengagement of traveling nut thread during operation of 
va Ive. 
DAVIB.S.M. Baltimore Gas tt Electric Co. 79/02/22, 2pp. 



79QE26O336 DOCKET BO-31H Calvert Cliffs Nuclear Pnwer Plant, 
Forwards LER 79-005/03L-0. 
RUSSELLiL. B. Baltimore Oa s !. Electric Co. 7-7/02/22. lp. 



Unit 2 



790226033? DOCKET SO-31B Calvert Cliffs Nuclear Power Plant, Unit 2 
LER 79-003/O3L-O on 790129; during operation, t louJ transmitter 
output uai Pound pegged high & mas bypassed, Caused by 
packing leak In transmitter equalliing !< reference leg 
isolation valves. 

CARROLLjJ.j MIERNICKIiM. O. Baltimore Qas 5> Elnctric Co. 79/03/02. 
2pp. 



7703130040 DGCKE1 SO-3PO Tnree Mile Island Muc leer Station. Unit S 

Informs of forthcoming h-earing on \anding pat turn >-' other 
i ssues. ui/t est imony frnm intervenors Citiicn-s far iiafe 

Environ ir Vork -CanimittBe for Safe Environ three ui tresses 
re aircraft overflights at site. 

DUFLD.ME. , SHARFMrtN, JE. Atomic Safety anil UirensiHfl rtppeal Panel 
79/02/O1. 2Spp 

7902130111 DOCKET 30-32O Threo Mile Island Nuclear Station: Unit 2 
ForuiaTtfa Endora ement 36 to NELIA KF~2SO 
OERETV,HF. General Public Utilities. 79/0^/09 lp. 



7902130139 DOCKET 50-330 Throe Mil 
Forwards NELIA Endorsement 2 for 
calendar ijtiar 1979. 
QERETV.K.F. OPU Service Corp. 79/O2/O9 



!slani) Nu<lear Station. Unit 
inder Ef-^i, t. E0-b5 for 



3pp. 



790226O3BB DOCKET 30-320 Three Mile Island- Nuclear Station. Unit 2 

Fo-ruiards certified capias of EnDors OHIBTI fc 31 to M(\Et-U policy 
MF-73 for calendar ypar 1979 
GEFIETY.H F. OPU Service Carp 79/OE/2Q 2pp 

7903210117 DOCKET 50-320 Three Mile Island: Nuclear Station, Unit a 
Confirms mgt meeting scheduled for 7902O7 to discuss MRC 
Insp program at facility. 

DRUNNER, E. J. Keg ion 1, Ph i lad ul ph i a. Reactor Oiierotion-8 Murlvnr 

Support nranch. 79/O1/2-). Ip. 

79022702B0 DOCKET 50-32O Threo Mile Island Nuclear Station, Unit a 
Forwards Tech Spec Change Fleituest 2O, request ing amend to 
App (* of License DPR-73, re Jncnra detector syo. W/Cert i f icate 
of Eve. 
HERBEIN, J. 0. Metropolitan Edison Co, 79/02/S1. 9pp. 

7902010.302 DOCKET 30-320 Three Mile Island Nuclear Station, Unit S 
Fnruiardi IE Circular 79-O2, "Failure of 130 Volt Vital AC 
Pouer Supp 1 1 os. " 

ORIERiB, H. nagifln 1. Philadelphia, Office of the Director 

79/01/16. Bpp, 

7903030240 ROCHET 90-33O Threo Milfl IsUnd Nuclear Station, Unit 2 
Submits add.1 change bu inservlcD Insp program. Jus t i f station 
fur change end. 
HERBEINi J. G. MatropolLtnn EdiBon Co 79/01/25. fapp. 

7902130009 DQCHKT SO-3SO TKroo Mile Island Nuclear Stntion, Unit E 
Forwards IE Info Notice 79-01 . "Beraoii-Pntcrsan Hydrnulic 
atiock fc Qiiiaij /irreotiirE (HSSA>. " 

ORIER.n.M. Itogion 1, Ph 1 lade 1 p hi.i, Office of the Director 

79/03/02. 2pp. 

7902280170 DOCVtET 50-320 Thrct Mile Island Nucloar Station, Unit; S 
Forwards IE Bulletin 79-01. "Environ Oual i P i cntion of Class 
IE E-quipmont. " W/list of 11 systBmatlc evaluation (irngram 
plants far which no action 1 & required. 

OfllEltiB. H. Region 1, I'h i I.Uol phia, Office of tlie Director. 

79/OS/QB, Spp. 

7903K200fiB DOCKKT 50-3HO Throe Mile Island Nucloar Station, Unit E 
Foruiiirds montiily operating ro|it for Jan 197? 

. G. Metropolitan Edison Co. 79/02/07. , lp. 



7903330061 DOCKET 30-320 Throe Mile Island Nuclear Station, Unit 2 
Informs that TRADOC Pamphlet 3SO-30, " Interservice Procedures 
for Instructional Sys Development" referenced in MUREG-0319 
IB available in microfiche form from NRC. 
BEBAW.W.J. Division of Document Control. 78/11/20. 3pp. 

790SO-6O11J DOCKET SO-32O Three Mile Island Nuclear Station. Unit 2 
Affidavit affiming that supplements attached to testimony of 
JM Vallance uere prepared or supervised by S Kaplan & are 
true h correct. 
KAPLAN, 3. Shaiu, Pittrnan, Potts. & Troujbrldge. 79/01/OB. lp. 

7902060114 DOCKET 50-330 Three Mile Island Nuclear Station, Unit 3 
Applicant's motion to correct JM Vallonte 7B1211 testimony 
ab page IS.W/encl corrected page IB. affidavit of JM Vallance 
affirming mathematical corrections, t. Certificate of Svc. 
TROUBRIDGE.S. F. Shau, Pittman, Potts, !< Trauihridge. 79/01/12. 
Spp. 



79D3SH0071 DOCKET BO-32O Threa Mile Island Nuclear Station. Unit f 
Monthly operating r-ept for Jan 1977. 
LENQEL,R,A Metropolitan Eiliaor Co 79/02/09. 1pp. 

790201O10fl DOCKET 50-320 Thruo Mile Island Nuclear Station, Unit 3 
Forwards LER 78-O71/O3L-0. 
HERBEINi J. 0. Metropolitan Edison Co. 79/01/23 lp. 

790S01Q10B DOCKET 50-330 Thro* Mln Island Nuclear Station. Unit 
LER 70-07 -3/03L-0 on 7t!122O. 1 uscl oanerntor BF-X-IB ffli lei) 
to start during Burv^el 1 lanco due to partially clogged fuel 
oil filter. Fil tor replaced. 
* Metropolitan Edisnn Co 79/01/23. lp 

7902120114 DOCKET 5JO-320 Three Mile Hlann 1 Nuc 1 car, Sta fcion, Unit a 
Forwards LEFI 7Q-O69/99X-0. 
HERDEIN, J. G, Mptrupolitan Edi^un Co. 79/01/30 Jp 



7902030321 DOCKET 90-35O Three Mile Island Nuclear Station, 
Applicant'* response to intervenors' 7B12S7 motion to 
pl-Bent witnesses on aircraft Plight patterns issue, 
Questions relevancy of addl testlm-any !< timeliness of 
mot ion. Denies charge of info concealment, 

TROWBRJDOE. 0. F. Shau, Pittman, Potts, t. Troiuhridge. 79/ 
llpp. 



79O2120I17 DOCKET 50-320 Three Mile I si, in if Nuclear 3tatit.ii, Unit B 
LR 7B-0&S/99X-0 an 7H1 1O7: in Mode 1, reduction in Fee-Juiatcr 
flaw led to reactor trip ft subsequent safety injection 
actuation. Feediuafcer flow reduction during phycics testing 
retiuired op era t ion at E leva ted temp. Ho corrective action 
STAIR. J. R. Metropolitan Edison CD. 79Y01/30 3pp. 



77O22B0464 DOCKET SO-32O Three Mile Island Nuclear Stationr Unit S 
Ansuiers applicants' 790112 motion to correct errors in JM 
Vallance'e testimony) has no objection to motion. Certi ficate 
of Svc end. 

CHANDLERrL. J. Office of the Executive Legal Director. 79/01/39, 
3pp. 



7902O602n3 DOCKET 50-320 Throe Mile Island Nuclear Station, Unit S 
Forwards LER 79-OOi>/03L-0. 
HERDESN.J.G. Metropolitan Edisc-t) Co 79/OW31 Ip 



DOCKETED ITEMS 



IP- 

"r^i L^-O^olZr* "' l ' '""" " "" 
HEHHEIN.J.Q Me t r Dpali t a n Edison Co. 79/02/01. l p . 



. 

STAIR, J,R Metropolitan Edison Co. 77/O2/01. Ip 

7702120161 DOCKET 50-330 Three Mile Inland Mllr1 ^ 
Forwards LER 79-OO3/03L-0 ""clea 

HERDEIN.J.G Me trop D l i tan Ed I S on Co 79/O2/C2. 

7902120163 DOCKET 50-330 Three Mile Island Nurt. 
LER 79-003/03L-0 on 790105: c onb c, u^^ r 

tr"n. t ?: n t D ;::?r p-nt H p r tr tiit "" d ** 

F^ontrn!';^ ^r^ Ca " 5Ed ^ " OUn f " Se 
STAIR. J. ft. MelropDliton Edi 5Bn Co. 79^03/02 



HERDE1N.J.G. Met r apo l i t an Ed lso n Co 79/02/09. Ip 



7WM6M40 DOCKET 50-321 Eduin I. H.tch Nuclear Plant, Unit 1 
Forwards Endorsement 35 to MALEU Policy MF-7B 
HUCK.J.R. Marsh J, McLennan. Inc. 79/02/19 '2pp. 

79 Sar fi2 ofBWR T v r" 321 ^"^ ' Ha * Ch NUC l6ar P lflnt ' Unit > 

LONQ.F J. Region 2, Atlanta, Office of the' Direc tor. 75/04/17. 

^For^ard! binSf 7 5 " 321 E " Wln J ' Hateh Nucl ^ PI-"*. U, 



1PPOLITQ,T.A. 



- 

Op.rating fl. tnp . Hrflnch 



Operating Reactors Branch 3. 79/O1/22 



2pp 

' 



LENGEL,R.A. MetTopol i tat.' Edi Bon Co. 79/02/02. lp. 

"r^E L D ^-3S^!S T " M1U l6Und N " 1 " "- " * 
HERDE1N.J. G. Metropolitan Edison Co 79/O2/02, lp. 






- 



HEMEIM.J.O. M.ti.0,.1,1., 



nn c 79/OS/O9. I B 



/O2/07 2pp. 



: 



SSK 



= 



- e P<"-GQiinBl errnr 

B. HetT-opolitan Edison Co. 79/02/15. Ip. 

790RMM74 DOCKET 50-321 Ed^ln I. M 3tch N uc l ear Plant, Unit 1 

r cople& of iiahuM -" " 



WHITMER.C.F. 



78/11/16. ,15pp 



,::;:^.:^-"' - 

Dlvition of D o[unle nt Cnrttrol. 79/01/09. 2pp . 

* 1 



u.- P "- 

WHTTMER.D. F, Georgia P QL , Br Co . 79/01/3O. Ip. 

. Antitrust !< Ind emn ity Croup, 79/01 /3J. 3pp. 



FIELDER. J. 



IPPOLITO.T.A. 



Operating FJ^rlora Branch 3. 79/01/22 3 ep 



Ofr.ce of WutrJear Reactor Regulation. 79/01/22. 3 P p. 



Branch 3. 79/O1/22 2pp. 



3pp 



,. . 

IPPOLITD, T.A. Oporati^g Reactors Branch 3. 79/01/99 

7902220257 DOCKET 50-321 Edu.in I. Hatch Nuelwr Plant Unit 1 
Responds to 790111 r ei , UHB t For r.vi Hlu of pap er "S"nt 
CUaring During Simulated LDCA U a Hark I DWR Pre"sur e - 

" Bg< - " "'- P-P^ > "c Bt " " 55ur<t 



GRIMES, C. 



Plant Syctems Branch. 79/01/31. 2pp. 



f 



octivifcy summary. 



Hatc " N ^- Pt, Unit 1 
ltg revieia, comprised of info 
hl "Pt.w/section Dn contract 
m " tl ngs held t, provide, 



7MB140aM DOCKET 50-321 Eduin I. Hatch NucUar Plant, Unit 1 

^rrecTv^,! i 7 1 ? i tp ln ""-in ^ of st p B ta en ^ 

- " n0tBd '" IE lnSp R " ptE 80-3=1^78-43 t, 



9 upp or t 



790SH033S DOCKET 30 -32 Eduin I, Hatch Nuclear Plant, Unit 1 
Responds to NJIC 7B1229 Itr re violation noted in lElnw 
^ fS^J^V? * M -^^B..CTrtiv. aluons ^ e, 
.} We 1 !"!. '" qlJP3t ' OT) "'* T - Ch SP " Wir. ffl .nt. at 
BTAFFA.R. W. Georgia Power Co. 79/01/li. Ip. 



M cLeT1Illan . i nt . 79/02/06 



DOCKETED ITEMS 



87 



7902SB0071 DOCKET 5Q-321 Edoiin I 
Forward 1 IE Info Notice 79-01. 
Shack fc Sway Arresters (HSBA1. " 
O'REILLY, J. P. Region S, Atlant 

79/03/02, 9pp. 



Hatch Nuclear Plant, Unit 1 
'G-ergen-Paterson Hydraulic 



Office of the Director 



7902120315 DOCKET 50-321 Eduin I. Hatch Nuclear Plant, Unit 1 
Forward! IE Bulletin 79-0 1 , "Envir on Qualification of Clase 
IE Equipment. " 

O'REILLY, J. P. Region 2. Atlanta, Office of the Director. 

79/02/03. 2pp. 



79021H0235 DOCKET 50-321 Eduiin I. Hatch Nuclear Plant, Unit 1 
IE Dulletln 79-O1 "Environ Qualification of Class IE 
Equipment". 
Office of Inspection & Enforcement. 79/OS/QS. 4pp, 

7902210163 DOCKET BO-321 Eduiin I. Hatch Nuclear Plant, Unit 1 
Forwards IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment." W/liat of Jl systematic evaluation program 
plants for which no action is required. 

O'REILLY, J. P. Region S. Atlanta. Office of tha Director. 

79/02/OB. 3pp. 



79O3O603&5 DOCKET 50-321 Eduin I Hatch Nutlean- Plant, Unit 1 
LEFI 79-Q04/Q3L-O on 7901 1 9: dur i ng performance OF procedure 
HNP-1-3302. armature winding of HPC1 injecting valve motor 
(E4I-FQ061 burned ujhen valve mas op ening. Mi nor internal 
disorder probably led to overheat. 
NIX.H.T. Georgia Power Co. 79/01/31. 2pp. 

7902230039 DOCKET 5O-321 EduiiTi I. Hatcfi Nuclear Plant, Unit ! 
Leak rate test oF valve E11-F015A uias satisfactorily 
completed on 79O13G. Forward s results of tnsp of torus areas 
& related pipe uel d a, hangers t> restraints, ti torus spraij 
header surface paint. 
MANRY,H. Georgia Power Co. 79/01/31. 2pp 



7902150396 DOCKET 3O-331 Eduin I 
Forwards LER 79-Q12/O3L-O. 
HANRY.M. Qaorgla Power Co 79/02/Q7 



tch Nuclear Plant, Unit 1 



7902150299 DOCKET 50-321 Eduiin I. Hatch Nuclear Plant, Unit 1 
LER 79-013/O3L-0 DTI 7901 34 during shu tdaiun, h igh pressure of 
300 to 300 psig eiisted In RHR heat e xchanoers. Caused h ij 
slow leak post E11-F015A valve. 
DrtXLEY, H. X. Georgia Power Co. 79/02/07. 3pp. 



79022B011S DOCKET 5O-321 Eduin I. Hatth Nuclear Plant. Unit 1 
Forwards IE Info Notice 79-03, "Limi torque Valvo Geared 
Limit Switch Lubricant." 

O'REILLY. J. P. Region 2, Atlanta- Office of the Director. 

79/02/O9. 2PP. 



79021300134 DOCKET 90-321 Edwin I. Hatch Nuclear Plant, 
Forward! monthly operating rept for Jan 1979. 
MANF;V,M. Georgia Pouier Co. 79/Q2/O7. Ip. 



79O213O326 DOCKET 50-321 Eduiin I. Hatch Nuclear Plant. Unit 1 
Forwards LEU 7?-QO5/Q3L-l . 
f-TANRY,M. Oeargia Power Co. 79/O2/O7. Ip 

79O2190330 DOCKET 3O-321 Ediuln I. Hatch Nuclear Plant, Unit 1 
LER 79-009/03L-1 nn 79O1IB:TDR 031-Rtl AD failed to actuate 
at its 15-B so ttlng. Caused by loose screw holding diaphragm 
in place, ak I owing air leak. 
NIX.R. T. Georgia Power Co. 79/O2/O7. Ip 



79021300B6 DOCKET 30-321 Eduiin I. Hatch Nuclear Plant, Unit I 
Monthly operating rept for Jan 1979. 
WILSON. S. Georgia Power Co. 79/02/09. llpp. 



7902150310 DOCKET 5O-321 Eiluin I. Hatch Nuclear Plant. Unit 1 
Forwards LER 79-OOB/O3L-O. 
MANRV.M. Offorflia Power Co. 79/O2/O7. Ip. 



79020401B3 DOCKET SO-331 Edwin 1. Hatch Nuclear riant, Unit 1 
Forwards LER 79-04i/OlT-l. 
MANRY. M. Georgia Poufer Co. 79/01/30. Ip. 

79020i01BS DOCKET 80-321 Eduin I. Hatch Nuclear Plant, Unit 1 
LER 7B-04A/Q1T-1 on 7GOili: w/reactor in startup t< hot 
standby, testing of excess Plow check valve B31-F040A 
revealed unacceptable leakage of 4.2 gph. Cause unknoun. Tra sh 
may have been an seat 6 been lost during valve removal. 
NIX.R.T. Georgia Poiuer Co. 79/01/31, Ip. 

7903060348 DOCKET 50-331 Edwin I. Hatch Nuclear Plant, Unit 1 
Forwards LER 79-002/03L-0. 
MANRY, M. Geoi-flia Power Co. 79/01/30. Ip. 

7902060294 DOCKET BO-331 Eduiin I. Hatch Noel oar Plant. Unit I 
LER-79-Q02/O3L-0 on 7901 1 1 : during normal operati on- HPC1 
team supplg valvesi E41-F003 & E41-F003, automatical ly 
laolated due to equipment room high differential temp & 
cold outside air flowing across inlet air temp elements. 
NIX, ft. T. Oeorgia Power Co. 79/O1/31. 2pn. 



7902060377 DOCKET 50-321 Eduin I. Hatch Nuclear Plant. 
Forwards LER 79-005/O3L-0. 
HANRY.M. Georgia Pouier Co. 79/01/30. IP. 



7903060365 DOCKET 50-331 Edwin I. Hatch Nuclear Plant. Unit 1 
LER 79-003/O3L-0 on 790H8:while performing HNP-1-330-M, TDR 
031-R616D failed to actuate at its letting of 13-s. Two-n 
time limit aicetded w/sys down far repair. Caused bg loose 
screw on diaphragm, resulting in component Failure. 
NIX,R.T. Oncrgls Power Co. 79/O1/3I. Ip. 

79021B0315 DOCKET 30-321 Eduiin 1. Hatch Nuclear Plant, Unit 1 
Scram on 790124: due to high pressure in residual heat 
removal ays haat eichanger A & H, A mas vented via torus 
spray valve E11-F024A. Water flashed to steam in torus (< 
pressure rose causing vacuum breakers to function. 
MANRY.M, Georgia Pouier Co. 79/01/30. Ip. 

7902060292 DOCKET 50-321 Eduin I. Hatch Nuclear Plant, Unit 1 
Forwards LER 79-003/O3L-0. 
MANRY, H, Oeorgia Power Co. 79/01/31. Ip. 

790206029B DOCKET 30-321 Edwin I. Hatch Nuclear Plant. Unit 1 
LER 79-003/O3L-0 on 7901 14: dur ing normal opertinn. hi-f low 
alarm occurred on stack effluent radiation monitor. Sample 
pump was found not running. Restart Failed, as did spare pump. 
Caused by failure of operating pump carbon valves. 
ROOERS.W. H. Oeorgia Power Co. 79/O1/31. Ip. 

790B060363 DOCKET 30-321 Edwin I, Hatch Nuclear Plant, Unit 1 
Forward* LER 79-004/03L-0. 
MANRYiM. Oeorgia Power Co. 79/01/31. Ip. 



7903130343 DOCKET 3O-321 Eduiin I. Hatch Nuclear Plant, Unit 1 
LEU 79-003/O3L-O oil 79O121: reactor ma* cnDling rate eiceeifed 
due to injection of ctmdensate Feeduater into reactor vessel 
during slowdown. Caused by pressure decreasing belou 
condensate booster pump discharge pressure. 
BAXLEY.a, X. Georgia Pouter Co. 79/02/O7, 2pp. 

7902I3040i DOCKET 50-321 Edwin 1, Hatch Nucloar Plant. Unit 1 
Forwards LER 79-009/O3L-0. 
MANRY. M. Girorgia Pourer Co, 79/OS/07. Ip. 

7-JQ21S011S DOCKET SO-321 Eduiln I. Hatch Nuclear Plant, Unit 1 
LER 79-007/O3L-0 nn 790123: dur Infi normal operation. uhi 1 e 
performing malnt on reactor water cleanup pumps. per sonnc 1 
unable to sample primary coolant everij 4-h. Caused by stopped 
up redundant sample line. 
HOQERB.W, H. Oaorgla Pouier Co. 79/02/07. Ip. 

79021303B7 DOCKET 50-321 Edwin I. Hatch Nuclear Plant, Unit 1 
Forwards LEfl 79-O1 1/O3L-0. 
HANRY.M, Oeorgia Pouor Co. 79/O5/OQ. Ip. 

790H1S0394 DOCKET 50-321 Ediuln J. Hatch Nuclear Plant, Unit 1 
LER 79-014/O3L.-Q Dn 790124: secondary c nn t a i nmen t violation 
surveillance not performed immediately after reatoration -of 
secondary containment, due to misinterpretation oP Tech 
Bpecl.Memo subsequentlg issued to clarify requi rement s. 
GREENE, T. Seorgia Pauer Co, 77/03/QB, Ip, 

7902130364 DOCKET SO-321 Edwin I. Hatch Nuclear Plant, Unit 1 
Forwards LED 79-01O/G3L-O. 
MANRY, H. Georgia Power Co. 79/O2/09. Ip. 

7902130371 DOCKET 50-321 Edwin I. Hatch Nucloar Plant, Unit 1 
LEfi 79-01O/O3U-0 on 790124: luring normal pre-cond i bional 
ramp, determined tliat a reactor -coolant chemistry sample 
could not be obtained. Caused bij both reactor water cleanup 
pumps being Inoperable i> primary sample line clogged. 
DflXLEV.S. X. Oeorgia Pokier Co. 79/02/O9. 2pp. 

7902150415 DOCKET 3O-3H1 Eduln I. Hatch Nuclear Plant, Unit 1 
Forwards LER 79-022/03L-0. 
MANRY, M, Georgia Power Co, 79/O2/09. Ip. 

7?021S0419 DOCKET 30-321 Eduin I. Hatch Nuclear Plant, Unit 1 
UER 79-022/O3L-Q on 790130: during normal operation t< 
procedure HNP-l-3flO5i cor e isolation cnoltng min flow valve 
(ESl-FOOA) Failed to close automatically at HO gpm. Caused! bij 
failure at open limit suited, 
NIX.R. T. Oeorgia Power Co. 79/02/09. 3pp. 

7903150432 DOCKET 50-321 Eduin I. Hatch Nuclear Plant, Unit i 
Forwards LEfl 79-OO6/03L-0. 
MANRY.M. Ooorgia Pouier CD. 79/05/O9. Ip. 



7902150435 DOCKET 50- 



DOCKETED ITEMS 



GREENE,! BOOTS i. P DlllB r Co 79/02/Ofl 

7902130435 DOCKET 50-321 e 0w ,r , lfflt[)l Nueh 
Forwards LER 79-O13/O1T-0 
NAMIV.fl. Gco , gia Poucr C0] ..._ , 



Plant: Unit 1 



v^r:r ^ K 7 ^,;-3 L E r i " r - Hatch "- - it 

MWRV.M. Oflor3ia Pobler Co n , oafQlt lp 



Draclet ,nto u i th -M 
fntrrlotk fr om P on( tioiuna BT 
. T GCD r Ula Poit . P ^" 



7 ?"?n^ K S-o a S;^ L ^ IB ' Kat " N 



HANRV,H. 



7902230103 DOCKET 5O-32I Eduin I Hfl ^, t , 

LER 79-Q07/03L-0 on 79013^^^, M!MP Pl ant , Un, 

iln ftu valv, iE-^' " ' 3Ol3t " 1 """"9 



.lv. operator t< top. 
NIX.R.T. Georgia P 0ble r Co. 79 



79/O2/14. a pp . 



Light Water Reactor* Branch A. 



>- .*, 

" D<ur " r " 



t - 






7903(1903-13 DOCKET 



30pp. 



7902O9O3Q3 



790S33OOfil POCKET 
IHP.P-. th.t 



Station 



7903030234 DOCKET 

-t. f.^1 

1--WM for ilrmm 



Decent Co tro]. TB/li/ao. 3pp . 

Pow " statlon 

?/^ 1 " l -PPlte.nl; 
lk County. HV, 



HCEFLING, R. K Offic 
lp. 



of the Executive Legal Director. 79/OUO3. 



7Biaw*."!lunB'" 1CI " n " nt " 1UBre SUpplied to """shapiro'at 



2pp. 



.R K. ofrlc. of the E.ecutive Legal Direct 



or. 79/01/O4. 



790119024] DOCKET 50-323 Shn>. h am n i 

F. PU .Pj m NUREO/C^oiSS, "S?0 *?. ^I P T Stflti n 
*h. US NRG" to P.rti 5 p'p D *:: d *J""^ c H ; 1 ' 1 " er "P B-Pt 
statement re r op t W/o end rent "evelop.ng pnlicg 

, , D y<{ h :-& eiltlwi LBHal Director 



' n '' > 

tori 2,' 'a% 'S, 6 ! J j'n 6 ?? 11 ! U 

-^ fl " ; pp- 5 o?-:?. 

the E'^utlve Legal Director. 79/01/12. 



Poli " P Statln 
t For suramaru 



ecutivo Lc Da l Director, 79/O1/12. 

rrr- ?-" 

ke dBpoaition of Ron 
Ip. 



22pp. 



790206O14D DOCKET 5n-^3 
NKC . n . ? to iplicf 
d 5pas ition of c.rt? 

.p. M t, n&r: a 



6pp. 



Caratena 



pr.vld.tf to En.r Rearc Qr 
t" MHO Technical A..*""t Mu?t 
are t, e i ng provided t 

.I..K. o, rte . of the Ele 






f V" alread "* 

' C copi " op "ir.nt matl 



Station 



nt uu r iw p - 

County C M t.ntion,%;?ri "un? ''*"" '"" -' Suffolk 
<H> * M.(li-u?" Por lick o r .'r 1111 ' 83 ' 111 ' 178 '"- 
hoard. ack of rfl '*ing a genuine iaa ua t 



Contentions 



5ufPo!k Cnunt 



' fiE En9ei 






U S ht 



flr . neh 4 . 79/ol/33 , 7pp , 



DOCKETED ITEMS 



790212O3O1 DOCKET 5O-322 Shoreham Nuclear Pouier Station 

Amend 31 to license app 1 i cat ion, consi sting of Revision 15 
to FSAR. Contains voluntary changes to emergency plan.FSAP) 
Section 13. 3. 
* Long Island Lighting Co 79/02/G2. 135pp. 

7903210031 DOCKET 50-323 Shoreham Nuclear Power Station 
Lists project reviews for neit five ftCRB Full committee 
meetings. 
CROCKER. L, P. Division of Project Hanagomont. 79/03/03 2pp. 

7903010247 DOCKET 50-323 Bhoreham Nuclear Pouer Station 

Forwards IE Circular 79-02. "Failure nf 120 volt Vital AC 
Pouier Supp 1 les. " 

ORIER.n.H. Region 1, Philadelphia, Office of the Director. 

79/01/16. Bpp. 

7902130016 DOCKET 5O-322 Shamham Nuclear Pouar Station 
Forwards IE Info Notice 79-01. "Bergen-Paterson Hydraulic 
Shock b Swag Arresfcora (HSSA). " 

ORIER. B. H. Region 1. Philadelphia, Office oF the Director. 

79/02/02. 2pp. 



7903310039 DOCKET 3O-D23 Diablo Canyon Nuclpar Power I'ln 
Flesponds to 79OIO4 order to show cause & request for 
directed certification Requests ASLQ find that iritorv 
have Failed to establish requisite e i c ept i ona] 
circumstances. Certificate of Svc !. tranicri|it en.t 1 
OEHO, A C 3nnll & Wi Imer. MDHHISSEV.J C , CflaNEp C. ft. 
Electric Co. 79/Q1M7 ]3pp 



Pacific Oas 



7702O3QO95 DCCHET 5O-323 Diablo Canyon Nuc]pai- Pow&r Plant. Unit 3 
NRC motion to ujaive 10CFR2. 762<c ) ti reiponse to I nlerveniir -i 
3an Luis Obispo Mothers For Peace 7B123I petition for 
directed c ort i f t cotl on & siipp] dtd 79OI 1 1. Cone Ivdee pL'titinn 
should Se danied Certificate of Svc encl 

STrtENllERG, M. fi. Office of the Executive Lego] Director. 79V01/1H 
32pp. 

7903110403 DOCKET 50-323 Diablo Canyon NuclE.ir Power Plant, Unit 2 
ACRE motion tn File brief omicut curifli! re subpoena of Oi-s 
Trifunac & Luto. Office of General Counsel attorneys uih a 
participated in, interpretation ti F LOCFHB. 72OI h 1 uill rnt 
represent ACftE. 
EHIEUD8, H. M. QFFice of the General Counsel V9/OI/1B Ip 



7903200189 DOCKET SO -3 32 Shoreham Nuclear Pouior Station 

Forwards IE Bulletin 79-01. "Environ Qualification of Class 
IE Equipment." H/llat of 11 systematic evaluation program 
plants for which no action Is required. 

ORIER, B.H, Region 1. Philadelphia. Office of the Director. 

79/02/OB. IP. 



7902260620 DOCKET 90-323 Diablo Canyon Nuckear Power Plant, Unit 2 
Responds to 7B072S Iti- requesting addl info re main steam 
line break ana lysi s. Di ECUBSIS containment temp Li/respect to 
time, sample collection of instrument thermal response to 
containment b qualification temps for equipment. 
CRANE.P.A. Baltimore Oai E, Eloctric Co. 79/13/10 9pp. 

7<?0a080237 DOCKET 50-323 Diablo Cangon Nuclear Pomer Plant. Unit 3 
Forwards copies of Amende 73 & 76 to license application. 
U/encl Certificate of Svc, 
CHANE-P.A. Pacific Oaa b Electric Co. 79/O2/OS. 3pp. 

7902080341 DOCKET 90-323 Diablo Canyon Nuclear Pownr Plant, Unit 
Am end i 79E< 76 to llcensa ap plication. Includes matl for 
Chapters 4. 1A It 1O of Hoaflrl Beismlc Evaliration. 
Pacific Qat d Eloctric Co. 79/02/03. 123pp. 



790S09030B DOCKET 50-323 Diablo Canyon Nuclear Pouar Plant, Unit 2 
Forwards description of Fireproofing Fur electrical conduits 
based on comparative' test r*ul ts. Bel leve-s resulting 
configuration meets t< exceeds NC fireproof ing requlrBmont. 
Conduit f (reproofing is being instnllad. 
CRANE.P.A. Pacific Gas t> Electric Co. 79/02/03, 4pp. 

7901Z30O1B DOCKET 90-353 Diablo Cangon Nuclear Power Plant. Unit 3 
Forwards NUHEO/CR-O40Q, "Risk Assessment Revleu Group Rept to 
the US NRC (Leuls Rept ) i provid ing recommendation! for use of 
risk assessment methodology It assessment of WABH-1100. U/a 
encl, 
DAVIS, L. D. Office of the Eecutivo Legal Director. 79/O1/15. Ip. 

7902060301 DOCKET 90-323 Diablo Canyon Nuclear Pouer Plant, Unit a 
Supplements joint intorvenors 761231 request to A BLAH to 
certify question of issuance of subpoenas to M TriPunac t< 
6 Luco. Requests readmittance of ABLU'a eiliibit No 3, A-J. 
Certificate of Svc encl. 

FLEISCHAKEK.D. B Cantor for Uaui in the Public Interest. 79/01/11. 
llpp. 

7902QB0293 DOCKET 30-323 Diablo Canyon Muclear Pouier Plant, Unit B 
Responds to 79O103 ltr.Eplains that neither 7BI201 Ifcr nor 
encl were received bij NRC.Uill respond to thorn If received, 
CQMDB.T.R. Correspondence t, Records Branch. 77/01/12, Ip. 

7902080396 DOCKET QO-323 Diablo Canyon Hue 1 ear Pouier Plant, Unit 2 
Cites statement contained In 790109 I tr from author to 
President as indicative of CA Public Util Commission's 
inability ta identify calculations establishing structural 
stability under earthquake conditions. 
CAL3DYAS. C. D. APf illation Unknown. 79/01 /OS. Ip. 

7902010375 DOCKET HO-3S3 Oiablo Canyon Nuclear Power Plant, Unit 2 
Objects to plant licensing since danger i not worth the 
risk. 
HURRAY, E. Affiliation Unknown. 79/01/19. tn. 

7903010377 DOCKET 30-323 Diablo Canyon 'Nuclear Pouier Plant, Unit S 
Objects to usa of nuclear oneroy before safe t< adequate 
provision is made for raduaste di sposal. A*Rs discontinuation 
of const due to proximity of an "earthquake fault." 
BACHELS, I, 0. Af Filiation Unknoun. 79/01/15. Ip. 



7902140413 DOCKET 50-323 Diflhlo Canyon Nuclear Power Plant, Unit 
ACWB brie-F ainicus curle re ABLE ruling doni/ing requested 
Eutpoonas of ACRE c onoul tants. He I i ovot difference in vieujs 
ui/consul tant s not an IBSUE & agrees in/Board's decision.. 
SHIELDS, W. M. Offico of the Ooneral Counsel. 79/01/1H. 4pp. 

7902EB01IO DOCKt-IT SO-333 Diablo Canyon Nuclear PQUIBT Plant, Unit S 
Letter of concern ro facility !i nuclear Industry in 
general. written by individual serving sentence in San Luis 
Oblnpo County jai.1 for traspasslnfl on util property on 
780906. Requests NRC attention to dangers nf facility. 
VAHNEF1, A. AFf II datio.ni Unknoun. 77/01 /1H. 2pp. 

79023BOH2 DOCKET 30-333 Diablo Canijon Nuclear Power Plant, Unit 
Eipressea opposition to grantinfi facility tonst permit 
fllCHHAN. E Affiliation UnKnoun. 79/O1/I1. I p. 

7^02300117 DOCKET 50-323 Dinblo Canyon Huflnar Cower Plant, Unit 
EipressaB npposltion to all nuclear pauor plants until 
adatiuate uuiote disposal eg 6 la found. Et-patlnlly nppn&cd to 
plants tocdted alunfl onr tliqusk e fault llnrs 
KflDSED.O. APflllatian Un known. 7<?/!)l/17. Ip. 

79033130123 EDCKHT 3O-323 Diablo Canyon Huclonr Pouior Plant. Unit 
EipreiiES opposition to nuclvnr power tor- safely r-cnaonv 
RmjuestB denial nf facility const permit 
FflEYEIt. A,! APf illation Unknown, V*?/Oa/Oi*. Ip. 

7 90228 008 4 DOCKET BO-333 Dialila Csriyun Nucloar Confer Plnnt, lAUt B 
Intervenor Ban Luis Qliispo Mnttiors far I'e.icu rspunse 
Infarning of inability to pnvllcipote In hearingidue to 
ilanlat of qualification of export ultnonsef. It ilsriiol of 
ace BSE to BDcurlty plan. Cortidc ate aP Bvc ancl. 
VALENTINE, P. C, . JONGS, Y. I. Ban l-Uis Obiopo Mothpro for I'naco. 
79/01/17, App, 

7902010398 QDCKfiT SO-323 Dlfllilo Canyon Wuclflar I'ciuor F'lnnt^ Unit B 
EpUtnt that limited JippDdraiicet. wnrv- hold on 70120-1-05. 
Although no a-ddl oral statomenia lull 1 be htardiwlll welcome 
tubmlttal at urittun statomimt 
DQWEfiS.E. B. Atomic Bafoty and Licensing Hoard I'nnel. 79/01/22. 

79O30IO403 DOCKET 50-3S3 Diablo Canyon Wuc I o-nr Pouor F'lanl. UnLl 
Rcqifatt pormlssion to make a limited appearance at hearings 
on 7WHOi, 
DALDH1N. M, rt. Friends aP the Earth, 79/01/1(1. Ip. 

7<70a2E305ll DOCKET 90-333 Diablo Canyon Nuclear I'ouiBr F'lant, Unit ."! 
Mffmorflndum h order grnntlnc) petlllon for dlrectBd 
crtlf icationf reversifs rtBLD rullnoa dumjlng lulipoiiiiaB for 
Drs Trlfunac & Luco. Instruc l-> Doard to Issue subpoenas !< 
remand* cause for further at t Ian. 

DUFLO-rt.E. Atomic SePotu anil Uic*nsinfl Appeal Panel. 79/01/23. 
llpp. 

79020iOOA3 DOCKET 50-323 Diablo Cannon Nuclear foujr Platit, Unit H 
Notifies tliat NC ulll not rev (BUI ALAD-Ulti dath of 
intervtnora 's witness rendered moot qumtlon of hla 
qualifications far accass to facility's security plan. 
CHILK.B.J. OPfice of th Socretary of the Commission 79/01/;.'i l j. 
IP 



79020SOOJ 1 DOCKET 30-323 Di-alilo Canyon Nuclear Power Plant, Unit 
Responds to 7(91123 Itr InquiriTio who Inappcts structural 
stne-1 at facil itij. Nnc has overall responsi ul 1 I ty I. licensee 
has seconddry responsibility to insp structure ?. to 
establish a OA pragram. 

OOSBICK.L.V. Office op tlie eecutlv& Director for .Uneratiori. 
79/01/23. -Ijip. 



70 

7903230.130 DUCKET 



DOCKETED ITEMS 



7902010330 DOCKET 



Operations NU cl 



7902010337 DOCKET SO-ta-3 n 

IE Ir^p fie|]ta 50-275/78-^^^"^" N "l"r Pow-r Plant. Unit 
n B nco. Pll ^ CB n t :* ** -?M/78-l B Dn 7 B l 2 O t -oa N "" ' * 
test procedure t, . v .?uatif' % ' ns P flc ted ^^"P^ational 
NDBBILL.P.J., 3TGRNDERQ D 5 ""' of t ..t re ^lt s 

PT-...n, Nu cl* flr S^V^ 9 ^," """ 



7902120127 DOCKET 
Fd, , E ?nL 



lp 



,n Fr.nU.co. 



7-5022&OHB5 DOCKET 5t>-3 S3 n : alh , ^ 

ck r Bceipt of 7B = Bb <> C an N , cl 

en to correct vlola 



7902360610 DOCKET &0-323 

"' 



Pn . or Plant , Unl 



of t(lt Dlrecto 



r p 
of steos 



- 



770aSfi06U DOCKET 



"03260615 DOCKET 



valuau " 



79,02,09. 



- ..JWi^j.V^ p 

Li-nit Switch Lgbrj can t " t-Jfl.itBr,, Val ve Q B 



Plan , 

"- 

f th . D 



7903230207 DOCKET HO-323 Di^hi 
R..pd. to V8rbfll N ^ r q^ 
invpllcation an fl l y ,i, for c ntn 









7903260060 DCCKET 






id'rssis:. 1 " ciass 

Atomic Bafaty and L 



Bn cu mEnt control. 77/01/09. 



2pp. 
it, Unit 3 



, pp . 



L ,, h , 



W/OI/M. 



P roduct , Div 



, 



79Q3S6CQOB DOCKET " 
F.r,rd. ^S 
Calculation Manua 



Operfltlng Re 



,,, 

Clearing During S m "Xd Lnrl I" 1 " " 1 of ""'" ""* 
"'"uri-Buppp;,"" Bu. ^S A " 3 Ma " k ! BW 
P-bllMtion. US ' "Mnd, paper bB acceptei( 

MHHEB.C.. PUnt S,.t. Br.nch. 



79/01/3,. 2pp . 



79030B019S DOCKET 
S Ubm U 5 D ?^ 
from selBcted s. 
billing .*.*" 

BSSmW'V et 

7W02/OS.' lop"" 






trtc Plant , Unit 
' ""ipr ised of info 



^^ C .,M,cl ear Enernu Product. 



790BI40IB1 
"til * 

propriBU 

NU3 Corp to std 



fl " ifl * In nt >" 
-""Ion of 



?, 1 ?: ^^t'^f:^:: - t *i-ic t , un 

ubnitt.) op radiologfca? Hfia.nt T ^V' 7?0al3 fop 
T ^ b E% da ^ '!*.? " ?wa Ch Spe "' B " li "t 

It.fcY.E.E. 



Carolina Power b Light Co. 79/02/09. 



lp. 



7902340170 DOCKET 30-334 Brunswick Steam Electric Plant, Unit 
Forwards Amend 19 to DPR-71 t. Amend 43 to DPR-62, safety 
valuation b notice of issuance. 
IPPOLITO, T. A. Operating Reactors. Branch 3. 79/02/09, 2 pp . 

7902260102 DOCKET 50-334 Brunswick Steam Electric Plant, Unit 2 
Amend 19 to Liconae DPR-71 . Revi see Tech Specs to limit 
annual gaseous release to 10CFH50 design objectives during 
interim period. 
IPPOLITO, T. A. Operating Reactors Branch 3. 79/02/O9. 21pp. 

79022601B7 DOCKET 30-324 Brunsuick Steam El ectri c' Plant. Unit 2 
Amend 43 to License DPR-&2. revi sing lech Specs to limit 
annual gaseous release to 1OCFR50 design objectives durino 
interim period, 
IPPOLITO, T, ft. Operating Reactors Dranch 3. 79/02/09. 31pp. 

7902260193 DOCKET 50-324 Brunswick Steam Electric Plant, Unit 3 
Safety evaluation supporting Amend 19 to License DPR-71 

61 Amend 43 to License DPR-6.2, 

Operating Reactors Branch 3. 79/02/09. 3pp, 

7902260194 DOCKET 30-324 Drunauilck Steam Electric Plant, Unit 2 
Notice of issuance of Amends 19 & 43 to DPR-71 t, DPR-62, 
respectively. 

IPPDLITO, T. A. Operating Reactors Branch 3. 79/02/09. 2pp. 

7903210231 DOCKET 30-324 BrunsuHck gfceam Electric Plant, Unit a 
Rnquests revision of Tech Specs re administrative mutters 
Attachments Li/changes encl. 
UTLEV.E.E. Carolina Pouer b Light Co. 79/02/12. 100pp. 

7902230132 DOCKET 30-324 Brunsulcl Bteam Electric Plant, Unit H 
Restates commitment of QA program in light of rccont 
issuance of Reg Guide l.H4,Jan 1979, "Audi tine of OA 
Programs for Nuclear Power Plnnta. " 
UTLGViE.E. Carolina Fouer t, Light Co. 79/02/14. 2pp, 

7902260337 DOCKET 30-324 Brunswick Steam Electric Plant. Unit 2 
Requests revision to Tech Specs to alloiu implementation of 
permanent mod to suppression pool-rreactor bldg vacuum 
breakers. H/enc 1 4,400 amend fee. 
UTLEY. E. E. Carolina Power t. Light Co. 79/03/19. flpp. 

7902270387 DOCKET 3O-3S4 Brunsuick Steam Electric Plant, Unit 2 
Foruards proposed Tech Spec revisions re hgdraultc snubbor 
insp program tc amend fee. 
UTLEYiE. E. Carolina Power & Light Co. 79/02/20, 33pp. 

79011201Q3 DOCKET 50-324 Brunauick Steam Electric Plant. Unit 5 
IE Insp Rept SO-324/7B-26 h 5O~323/'7B-26 on 701016-20. 
Noncompliance noted : fa 1 lore tn adhere to emergency plan b 
fire protection program implementing procedures 

PEROTTI.D.J., HUFHAH.J.H. Region S, Atlanta, Fuel Facility fc 

Materials Safety Branch. 78/11/16. r 14pp. 



DOCKETED ITEMS 



71 



7902280443 DDCKET 30-324 Dru.wic* Steam Electric PUnt, 
Forwards IE Insp Repts 30-324/7B-33 t, 30-323/70-33 on 
7B121fl-21.No nancompliance noted, 



Unit a 



Branch! 



Support 



79022B0445 DOCKET 30-324 Brunswick Bteam Electric Plflnt, Unit 2 
IE Insp Repts 30-354/76-33 fc aO-323/7B-3S on 7B1B1B-21 No 
noneomplianco noted. Major areas inspected: plant operations, 
cleanliness controls, review of shutdown planning 1 plant 
tour. r 

RILEV.B.W.. DftNCE.H.G. RflgionB. Atlanta, Reactor Operatio 

Nuclr Support Dranch. 79/01/11. 3pp. ^rav.o 

7902330013 DOCKET 30-324 BrunsuicV Steam Electric Plant, Unit 2 
Forwards IE Bulletin 77-01, "Environ Qualification of Class 
IE Equipment. " 

' J- ?' "9ion B- Atlanta, Of Pica of the Director. 



790213007B DOCKET 5D-324 Brunswick Steam Electric 
Monthly operating rept for Jan 1979. 
WILLIS, E. .Carolina Pooler S. Light Co 79/02/Q1. 



Plant, Unit 
8pp. 



FURR.n.J. Carolina Power t. Light Co. 79/01/31. 



TOLL s 
TDLL18DN. ft. C. 



"' 'I"""*" o,ce S6ive dEfllI b aa t in in 
Carolina Power A Light Co. 79/O1/31. 



Spp . 



7902140175 DOCKET 50-334 Drunsuicl Stc-an, Electric Plant Unit a 
Forwards LER 79-O05/O3L-0. GIUHI-IE riant. Unit 2 

FURR.B.J. Carolina Pouier ?, Light Co. 79/02/07. Ip. 



Carolina PouJcr & Light Co. 79/O2/07. 



770H1302H3 DOCKET SO-324 Drunswiclf Btean 
Forward! LER 79-004/O3L-0. 
FlfRR.D.j. Carolina Pouier t. Light Co, 



El&ctric Plant, 
79/02/OB. Ip. 



79031502B6 DDCKET 30-334 nrunswict Stearr, Electric Pla 
J.ER 79-004/03L-0 on 79O11O: chart reorder for MC-A 
w* reading inac cu r a t l u , BinCB Bflmpl Tp mp f or dr. 
monitor CAC-AT-1259 u,a B producing pnor f liwdu. to 
malfunction, 
TOLLISON^A, C. Carolina Pouer t, Light Co. 79/O2/OH. 



7902S2014G- DOCKET 50-334 Druntulck Steam Elmtric 
Forward* LEU 79-OO3/03L-0. eimiric 

FUflR.B, J, Carolina Power !, Light Cd. 79/02/13. 



Plant 
h-lant- 

Ip. 



7902320147 DDCKET 50-324 Brunswick Steam Electric Plan 
2.uTS^ 03L ~? " "" B ^ e n BT at r fa, Je S to pr^u 
output voltapc. Caused by failure of generator field 
switch to make good contact 
TOLLISDN.A.C. Carolina Pouar * Light Co. 79/03/13, 

7903220119 DOCKET 30-333 Brunsuicfc Blear* Electric Plant, 
Informs thai TRADDC Pamphlet 330-30, "lnber*ervice Proc 
for Instructionol B U s Development" refsrenced in NUREO 
is avallabtD in microficlia Form from NRC. 
BEBrtW.U.J. Division of Document ControS. 77/01/09. 



2pp 
Unit 2 

it, Unit 

11 

lp- 
Unit 2 

t, Unit ; 

te 

re set 

2pp, 

Unit 1 
-O219 
2pp. 



790200021B DDCKET 30-323 Brunsuick Steam Electric Plant. Unit 1 
Foruarris Endorsement 32 to NELlft Pnlicy NF-318. 
QRAHftM, W. E, Carolina Pouier (< Light Co, 79/03/01. 3pp. 

79020130.232 DOCKET flQ-325 Brunswick Stoam Electric Plant, Unit 1 
Forwards Endorsement H to NELIA Binders ED-5fl,ED-S3 t, KAELU 
Cinders XB-34 & KH-39, providing secondary financial 
protection for calendar i/ear 1979. 
ORAHftH.W.E. Carolina Pnuer ft Light Co. 79/OS/01. 9pp. 

790B3'30J3B DOCKET 50-323 BrunEuIck EJteam Electric Plant, Unit 1 
ForiiMPiff Endorsement 29 to MAELU Policy J1F-BO for calendar 
gear 1979. 
GHAHAMi W. E, Carolina Power S. Light Co. 79/02/19. 2pp. 

79022B03B3 DDCKET BO-323 BrutiflUiick Btoam Electric Plant, Unit 1 
A follouiup to NHC 7B1115 request for submlttal of Offslte 
Dose Calculation Manual for approval, forwards guidelines for 
general contonts of manual. 

QRIWE3.D.K. Assistant Director for Engineers I. Projects. 

79/01/1B. 3pp. 



79022B0243 DOCKET 50-3B4 Drunnuick Steam Electric Plant, Unit 3 
Forwards IE BulUtin 79-01, "Environ Qualification of Class 
IE Equipment. " 

^i^=' J - P - RB Bion 2- Atlanta, Office of the Dl rB ctor. 

/V/O2/O3. 6pp. 

79022B005H DOCKET 30-324 Brunswick Bt>am Electric Plant, Unit E 
Forward. IE Info Notice 79-03, "Limi torque Valve Geared 
Limit Switch Lubricant," 

' Jl fiOSiDn S ' Atlant <" Office of the Director. 

, 2PP' 

7902130076 DOCKET 50-3H4 Drunsuick Bteam EUttrU Plant, Unit 2 
Forwards monthly operating rept for Jan 1979 " 
FURR, B. J. Carolina Pouior fc Light Co, 79/OS/09. Ip. 



79020ao?a9 DOCKET 50-333 Drunsuiick Bbuam Elcitric Plant, Unit I 
"Info on Reactor Vessel Matl Surveillance Program. " 
* General Electric Co. NEDD-3-llAi. 7B/11/30. 42pp, 

77021402IB DOCKET 30-323 Drunsuiick Steam Electric Plant, Un I b 1 
Forwards ilntfers b eets of divider tabs for use ui/NEDD-SiaaB 
"Mark 1 Containment Prooram Load Dnfinitian Rpt. " 
BOBQNiL.J, Oeneral Eloctric Co. .Nuclear Enarou Products Div 
79/01/OB. Bop. 

790206,0002 DOCKET 50-325 Brunswick Steam Electric Plant, Unit 1 
Forwards Amend 18 to License DPR-71. afaty evaluation t. 
notice of issuance. 
IPPOLITO, T. A. Operatinn Reactors ttranch 3. 79/01/19, 3pp. 



72 



DOCKETED ITEMS 



ric Plant, Unit 1 
level 



IPPGUTQ.T.ft Opsrst^rn^ctor'rBranch ^^/O!/ 1 ,. 6pp . 



- Office of Nut !,,. Reactor R. flU la t , on . 79/O1/19. 3pp 
V902Q40005 DCCKET 50-325 Brun.niek Stea* Electric Ptant, Unit 1 

?PPo!irS T i r u rCe ri Df A nd 1B to L1 """ wS-7i ' 

IPPOLITD.T./, Operating Reactors Dranct, 3. 79/O1/19. 2pj,. 

7902260006 DOCKET 30-325 Brunwltk Steam Electric Plant Unit 1 
El-V "! u "<"V flr fll"l cont cnte of Off te Sose 

^^^crd^Sn an r d < - * 

IPPOLITQ, T. A, Oporatinj ftcactora Branch 3. 79/O1/S3. 7 pp . 



Clearing During .uatid LOW in a Kark I QWfi 

juE;!e^;o7 pr "' lon BgB ' n *' <* p-p" .. pt- f r 

OHIMES, C. Plant Eystnras Branch 79/01/31. 2pp. 

79G2UD019S DDCRET 30-335 Brunswick Sto m Electric Plant Unit 1 
? ltS D"J 1, 7R p m Qc , ivltv rev^.c^pr sea 'in 

*? ""* illn " F fflonthl 1 pt. u /cti D n cm contract 

i "I/!?""*"''- 1 '*' m " tin B s " * Prides 
sl activl ty tifmrnorij 

" ElBCtrle Co - '' *n.r Product, 



V 29 Drl """'" BtM- EUclric Pi nntl Unit 1 
of revi.u D f ultraftonlc rfata of a ll 

P t ,'' N ? v "B b J^ 1979 D , m in a ti ( ,n B .0 o [I 
eni1 Uftl1 " ma<lE * e"-l-tli h OBIS n D 

";^""" 111 " 1 tD lherrafll s]Bflve di-gr-m. 
ta LaftDratoriea. 79/02/O5. fl pp . 

7702MOia4 DOCKET 30-335 Brun.wlck Bteam Electric Plant, Unit J 
ffquit r BV l E ion to Toch Bp OCS to ^hattac surveil l flllc * 
renuiromontt Por !tnndb gai treatment sys hoaten Reviaod 
pagoa and. 

UTi-EY.E.E. Carolina Pouier 4 Linht Co. 79/O2/06. 4pp. 



7902310231 DOCKET 9O-325 Drunsuicli Steam Electric Plant. Unit I 
Requests revision of Toch S P ecs re adimlnlstratlvo matters 
Attachments lu/charigae enc 1. 
UTLEV.E.E. Carolina f'ouior !. Light Co. 79/O3/12. 100pp. 

7903230132 DUCHET 50-325 Brunswick Steam Electric Plant, Unit 1 
Restates commitment of OA program in light of recent 
issuance of Reg Guide 1.144, Jan 1979, "Aud i t ing of QA 
Programs for Nuclear Pouer Plants. " 
UTLEV.E.E. Carolina Pouar t< Light Cn, 79/03/14. 2p p . 

7902260337 DDCKET 30-325 Brunswick Steam Electric Plant. Unit 1 
Requests revision tn Tech S P BCB to ollou im p lementat ion of 
permanent mod to suppression pool-reactor bldg vacuum 
breakers. U/encl 4, 40O amend Fee. 
UTLEV.E.E. Carolina Power !. Light Co. 79/OH/19. 4pp. 

79022703B7 DOCKET 50-323 Brunswick Steam Electric Plant, Unit 1 
Forwards proposed Tech Spec revisions re hydraulic snubber 
insp program fc amend Fee. 
UTLEV.E.E. Carolina Pnucr (. Light CD. 79/OS/30. 53pp. 

7901120189 DOCKET 30-335 Brunswick Steam Electric Plant, Unit 1 
IE Insp Rpt 50-324/7B-26 !. 50-3SS/7B-26 on 70101i-30 
Noncompliance noted , fa i lure to adhere to emergency plan t, 
fire protection program implementing procedures 

PEHQTTl.D.J., HUFHAM.J.W. Region 3, Atlanta, Fuel Facilitu fc 

Materials Safety Branch, 7B/1 1/lt. 14 PP . 

79033B0443 DOCKET 50-333 Brunsuiick Steam Electric Plant. Unit I 
Forwards IE lns P Repts 30-321/7S-33 t, 50-325/7B-35 on 
7012IB-31,No noncom P liance noted, 



79022Q0443 DOCKET 50-333 Drunsyick Steara Electric Plant, Unit 1 
IE Insp Repts 50-G34/7B-33 (, 30-325/78-35 on 7B13la-31 No 
noncompliancB noted. Major areas inspected : P lant o P e ra tions. 
cleanlinoss control s, revleu. of ihutdouin planning b plant 

RILEV.D.W.. DrtNCE.H.C. Region 3- Atlanta, Reactor Operations 

Nuclear Support nranch. 79/O1/11. g pp . H 

7902aa0013 DOCKET 50-325 Bronaulck' Steam Electric Plant. Unit 1 
Forwards IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment. " 

nBai n 2 ' AUant0 ' 0ffilB of the Dii- 



7902 4010 1 DOCKET HO-330 Bruniwiefc Bt Bam Eloctric Plant, Unit 1 
Utll has retained 1.IS Div at the HUB Corp to assis-t in n on - 
. P ,. r .JI P ^ y """"'"S-'-ilnteil lesuea. FlEquests addition of 

S!F S'S to *'"*'"''"' >l.l far n n-pro P ri E tar y UTS. 
HOME. P. W. Carolina Power f, Light Co. 79/02/00 lp 



7903300215 DUCKET SO-335 Drunauick Stoam Electric Plant. Unit 1 
Forwards IE Dull. tin 79-01 . "Environ Qualification of Class 
IE Equipment. " 

79/02/03' J '6 PP ROgiOT1 3> AtUnta ' Ofei<:e of the lector. 



!>0-:523 Brunswick Bteam Electric Plant. Unit 1 
Notifies HttC that do opt to requested date of 790213 for 
ubmlttnl of radiological effluont Toch Bp DCB, earl i e st 
pnmlulit date for submlttal in 790312. 
UTLEV. E. E. Carolina Power & Light Co, 79/Q2/O9. lp. 

7902340363 DOCKET 30-325 Brunswick Steam Electric Plant, Unit 1 
Qununaru. of BUR venting procedures ft practices. 

LONO.F.J, Roginn 2, AtUntn. Office of the niractor. 7S/04/I7 

2pp. 

7903260170 DOCKET 30-325 Brunswick Steam Electric Plant, Unit 1 
Forward* Amend 19 to UPR-7] b flractm <13 to DPR-&E, af etu 
evaliia t iuri !< notice of issuance. 
IPPOL1TQ, T. rt, Operating Reoctors Branch 3. 79/03/09. 2pp. 



7702200032 DOCKET 50-325 Brunswick Btfram Electric Plant, Unit 1 
Foru,ards IE Info Nntite 79-03. "Limi torque Valve Geared 
Limit Switch Lubricant. " 
?nk=' J '^ " B 9in B. Atlanta, Office of the Director. 

/ ffVjtftjT, itpp 

790H270360 DOCKET 50-3H5 DTwn.ulcfc Bteam Electric Plant, Unit 1 
Presents results of rainspection of rec ircul ation inlet 
nojilB aafe-entls. Concludes no dotectflble change eists In 
n?.? 2V* r C "? S N2A ' N2D 'NaD,N3E,M2Q,N2H,Maj. & N2K, 
UTLEY.E. E. Carolina Pouier & Linht Co. 79/02/21. 4pp. 

790213D07& DOCKET 3O-325 Brunswick Steam Electric Plant. Unit 1 
Forward* monthlu operating mpt for Jan 1979. 
FURH, B. J, Carolina Power fc Li B (it Co. 79/02/09. lp. 



77032601 BH DOCKET 5Q-3SS Brunsiuli!. Steam Electric Plant, Unit 1 
Amend 17 to License DPR--7J. Revise* Tech SJIBCB to limit 
annual gaseous releanB tn IC-CFnso design objectives durlno 
interim period. 
IPPDLITO, T. A. BOBTfltinB Heactors Branch 3, 79/OH/09. Blpp. 

79023601D7 DOCKET 80-328 Brunswick Stoom Electric Plant, Unit 1 
/mend 43 to Licenie DPR-faS. revls ln D Toth Specs to limit 
annual gaseous reloaso to 10CFH50 delfin objectivei during 
interim period, 
IPPDLITO,T.rt. fl-periting Reactnrs Draneh 3, 79/OH/09. Slpp. 

7902260193 DHCKET 50~3H3 Brunsuick Steam Electric Plant, Unit 1 
Safoty evaluation tuppprting Amend 19 to License DPff-71 

* Amend 43 tn Licenifr DPf?-62. 

Operating HenctorB Branch 3. 79/02/O9. 3pp. 



790313007B DOCKET 50-325 Bvunaulct Steam Electric Plant, Unit I 
Monthly operating ropt for Jan 1979. 
WILLIS, E. Carolina Power t. Light Co. 79/03/01. Bpp. 

7902060210 DOCKET 5O-335 Brunsu-ick StBan. Electric Plant, Unit 1 
Foruarits LEU 79-001/Q3L-0. 
FURR, B. J. Carolina Power S, Light Co. 79/03/O2. lp. 



S - 333 Bi-wwieli Stean. e lec tric Plant, Unit i 
9-001/03L-0 Dn 7901O1:HPCI sgs failed response time 
periodic test. TcBtlno to be done again after reactor 
startup, when steam is available. Event cause & corrections to 
bo submitted after satisfactory testing. 
TOLLISDN. A, C. Carolina Power t, Liflht Co. 79/02/03. lp. 



7702360194 DOCKET 30-323 Hrunaujick Ste^m Electric Plant, Unit 1 
Notice of i sou an co of Amonill 19 h 13 to DPR-7I It DPI7-d2. 



,. 
IPPflLITO.T. rt. 



Operating Reactor* Branch 3. 79/02/09. Spp. 



7902060239 DOCKET 5O-33S tlrunsui c k Stef 
Forwards LEFI 79-OOS/03L-0 
FURfl.Q.J. Carolina Pouier (, Light Co 



DOCKETED ITEMS 



73 



Plant, Unit 1 



79/Q2/03. lp 



7902060364 DOCKET 3O-329 Drunsulck Steam Electric Plant Un i t i 
LE R "-005/03L-0 on 79O1O4: 1 A rec ircul ati on pX 1 p e d 
ui/r.aetor at 977. power. ID pump then reduc d tn appro, 30V. 
speed. Caused by IA pump motor generator sot 1 ow lubrication 
T? ?" ,? missin iMlrnot.Niui lacknuts put in 
, A. C. Carolina Pouter (, Light CD. 79/02/02. 2pp. 



' 1 " 1 '* Btoom Electric ""* unlt ' 

RJHR.B. J, Carolina P ou , er j, Light Co. 79/02/OS. lp. 

79021SOI41 DOCKET 50-335 Brunswick Bteam Electric Plant, Unit 1 
LER 79-004/03L-0 an 79O103. containment aJm^p eri ,,Uo, 

tank containad lest than Tech Opec 1 Imit. Operator misread 
conversion graph, resu 1 ting in higher than actual nitrogen 
reading. Tank indicators to be marked ur/specific limit 
TQLLI9QN, A. C. Carolina Power !, Light Co. 79/02/05. 2pp. 



7902120143 DOCKET 3O-325 Drunswick Ste; 
Forwards LEU 7B-0&9/O3L-1 , 
FURR.Q. J. Carolina Power I, Light Co. 



Electric Plant, Unit 1 
79/03/05, lp. 



7902120115 DOCKET 50-325 Brunswick Steam Electric Plant, Unit 1 
LEr 7B-069/03L-1 on 7B0716' outboard main steaml Ine drain 
isolation valve B2I-F019 would not operate, Caused by motor 
bruahas not mafcinn proper contact u/commutator 
TOLLISON, f>, C. Carolina Power t. Light Co. 79/02/05. 3pp. 

79QB140163 DOCKET 50-323 urunsuic* Steam Electric Plant, Unit I 
Forwards LER 79-007/03L-0. 
FURR, Q. J, Carolina Powur t. Light Co. 79/02/07. lp, 

7903110163. DOCKET 30-323 Hrunsuicfc Btoara Electric Plant, Unit 1 
LER 79-007/03L-G on 790109; dur ing ays component test, 
residual heat removal pump "D" would not start. Caused by 
motor switch being in off position. 
TQLLISQN.A. C. Carolina Power t. Light CD. 79/02/07. 2pp, 

7902130099 DOCKET 30-325 Qrunsuick Bteara Electric Plant, Unit 1 
Forward* LER 79-OOB/03L-0, 
FUnn,D. J. Carolina Power t. Light Co. 79/02/09. lp. 

7902130101 DOCKET 50-325 Brunswick Steam Electric Plant, Unit 1 
LER 79-OOa/OO.L-Q on 7901 12; unac coptable levels at pump 
differential ays t. vibration noted during test of ID pump 
Cause unknown. 
TOLLISON, A. C. Carolina Powr t, Light Co. 79/02/09. lp. 

7902220091 DOCKET 50-325 Drunswick Steam Electric Plant, Unit 1 
Forwards LEU 79-003/O3L-0. 
FURR.D. J. Carolina PouiBr t. Light Co. 79/02/13. lp. 

7902320093 DOCKET 90-323 Drunsuick Steam Electric Plant, Unit 1 
LER 79-003/03L-0 on 7901 17: atoamltne IDUJ pressure isolation 
instrument actuated uelnu Tech Spec min. Caused dij loose 
clamp block allowing instrument torque shaft to slip 
TOLL1BON, A. C. Carolina POUJHT fc Light Co. 79/02/15,' ]p, 

7902H70897 DOCKET 50-323 Orunswick Steara Electric Plant, Unit 1 
Forwards LEU 79-010/03L-0. 
FURR.H.J. Carolina Power & Light Co. 79/02/31. lp, 

7902270298 DOCKET 3O-33S Brunswick Bteam Electric Plant, Unit 1 
LER. 79-010/03L-0 on 790133:n.flin turbine eontrol valve 
response time t*t failed to meet Tech Spec response time 
Caused bg slow actuation time on Installed switch 
TOLHBDN.fi. C. Carolina Power t, Light Co. 79/02/81. lp, 

7902270323 DOCKET 3O-325 Brunswick Steam Electric Plant, Unit I 
Forwards LER 79-002/03L-0. 
FURR.D.J. Carolina Pouier !i Light Co. 79/02/31. lp, 

7908870342 DOCKET 30-323 Drunswick Btuam Electric Plant. Unit l 
LER 79-002/03L-0 on 790123; stand.bg liquid control relief 
valve C41-F029 lifted at pressure of 1300 psig, below Tsch 
Spec min.No mechanical reason found. Valve reset. 
TOLLISON, A. C. Carolina Power !. Light Co. 79/02/21. lp, 

7902090233 DOCKET 50-327 Bequoyah Nuclear Plant, Unit 1 
Responds to 790111 phone request. Submits preoperatlonal 
nS'SS"?* time test P rocH( ' u fEB ! reviled response td question 
UB 33 In FSAR re effects of sustained high or lout grid 
voltage condition* on saf otg-rolated electrical equip. 
OILLELAND, J. E, Tennessee Valley Authority. 79/02/02. 34pp 



7902090213 DOCKET 50-337 Sequoysh Nuclear Plant, Unit 1 

Foruiards reviled response to NFiC 7B062B Hi- re Insa of flow 
to either i-etidual hcot removal pump Operator ojill monitor 
suction valves (, pl , mp Fio^ After re fuc 1 ing , alarm will be 
installed. Response ui 1 1 be in Amelia to to FSAR 
OILLELAND, J. E. Tennessee Valley Authority 79/O2/O5. lOpp 

790309024B DOCKET 50-327 Seqjoyaf, Nuclear Plant. Unit 1 
Notifies that rcEponse to NP.C 790105 lev re bolted 

Dn5 Utlder " iS '" i ' : loflllin tl "'"I ^ provided by 



OILLELAND. J. E. Tennessee Valley Authority 79/O2X05 lp 

7902120109 DOCKET 50-327 Bequayah Nuclear Plant. Unit 1 
Responds to NFIC 7B062B request f B r ad dl i,if re residual 
heat remaval Response null be incorporati'J into rtroend 6O 
of FSAR 

OILLELftND. J E. Tennessee Valley rtuthorit.) 79XO3/OS I3pp 



nU 1 ' 

info E[hedllle f T '"poni.. to 790119 re qtlOB t F r addl 

CILUELAND.J.E. Tenne S68e Valley Authority 79/O2/07. ,p 

79021400^ DOCKET 50-327 Seq.cyah Nuclear Plant . Unit 1 
Forwars results of W estin g hou SO analyses , tota core 
peaking Factor as function , core helght for j 

^*n nt a CyC ' e ' per NFiC 7 ' 0il oral request No 

OILLE L ^n T '?r net r" 1 '' y 5 ' nCe LQCA limit nat C"d.d 
OILLELANO, j. E Tennessee Valley Authority 79/02/OB. a PP . 

79033102.19 DOCKET 30-337 Bequoyflh Nuclear Plant, Unit 1 
DIU "3?"J' d ovcrsi ' ed "''-ings re intorloc"* 
FCV la , 11 1 C ^ 1 " dE5 ' 9n feflt1 "-" f<" i.alotion valveB & 
01LLEL ANn , ' T " elt "" nd f mtrMnttion (ra^inga 
OILLELAND, J. E. Tennessee Valley Authority. 79/O2/14. lp 

7903210236 DOCKET 50-337 S B q UO yah Huel,r Plant. Unit 1 
r".nt.*lJ 1M . t ''r Dni rBqUBSt fc ubmlt ' '"'* " 

.'mr nt : n :*;;:, p ;:::;:'!.i!! "-- " -*- 

OILLELAND, J E. Tenn B5CB Valley Authority 79/O2/I1. lp. 

7902220060 DOCKET 30-327 Beq,,o U0 h Nurlr Plant, Unit t 

Foruar,., responses to 7DIMB Itr Provides lut of al Class 

qu- i imc fl ;[:, a m d ,T l r iit '"**""<> ^ **" r 

OILLELAm i n i ' " or P'- fltBl1 '" *-n< 60 to FBAR. 

OILLELAND. ,1.0 T.nn.sie. Valley Authority. 79/OS/14 ^pp. 

7903330061 DOCKET SO-3H7 S^uoyah Nuclear Plant. Unit 1 

Inf-P.. that TRADOC P.mpUet 3DO-30. -Int.rti^i^ Pr.d,rr.. 

s a! LL in g %? e r ln '" ne " t " "'"""^ in NORM-MlS 

,, , "iiCTofithe form from NRC 

.M.J. Division of Document Control 78/11/211. 3pp. 



30 " re7 B 1-h N U =l..r Plant, Unit 1 
Radio ogical Emergency Plan " Sets Forth poliei.,. puppoin 

p 



79022200^1 DOCKET 30-327 Bequoyah Nuclear Plant, Unit 1 
Responds to 780920 roquost t, fnrojflrdB 790113 revision to 

Radiological Emergency Plan" J, draft revisions which will 
be incorporated before Issuance of operating licfinse for 
Unit I. Requests review t, informal commtirits. 
Q1LLELAND. J. E. Tennessee Vallsy Authority, 79/02/14. 1 j, . 

7903090242 DOCKET 30-327 Hequoyah Nuclear Plant, Unit 1 

Notice of address changes for dlstrlbutinn of corro.p ondenc e 

to utll re plant application. 

OILLELAND. J. E. TBnnossen Valley Authority. 79/02/05. 3 pp . 

7902BQ0342 DOCKET 30-327 aequoyah Nuclear Plant, Unit 1 
Forwards responses to 7B1329 request for addl financial 

OILLELAND, J. E. Tennessee Volley Authority. 79/O2/30. 6Qpp 

7903120204 DOCKET 50-337 Sequoyah Nuclear Plant, Unit 1 
Forwards Endorsement 11 to NELIA Policy NF-247 
FIELDER.J. Harsh & McLennan. Inc. 79/O2/06. 3pp. 

7902060171 DOCKET 50-337 Sequoyah Nuclear Plant. Unit 1 

Forwards draft revisions to FSAR, sent in response to 790117 
request for addl info ro tornado mi ssi I es. Over si ,ad di-Quirta 

OILLELAND, J. E. Tennessee Valley Authority. 79/01/25, 6pp. 

7902010073 DOCKET 90-337 Bequoyah Nuclear Plant, Unit 1 
Amend 59 to FSAR. 
* TannosBBB Valley Authority. 79/01/36. IfiGnp. 



74 

7902,20120 DOCKET 5O-327 Sequoyah Nuclear Plant, Unit 1 
Mil Ta i affldault of 5Vt for Amand 59 to FSAR 
MILLS, L. M Tennessee Valley Authority. 79/O2/03 2 PP . 

7 *L??t. )M J D Set ET 5 " 327 S qUDg311 rluclBar Plflrlt ' Unit 1 

CROCKER. L. P. Div.sion ot Project Management. 79/02/05. Spp. 

:lear Plant, Unit 1 



DOCKETED ITEMS 



D " at - ctl - ft Engineering 



7902090,1* DOCKET SO-337 Sequoyah Nuclear Plant, Unit , 

IE Ifl.pR.pt. SQ-327/7B-42 & SO-33B/7S-38 nn 7B12 1- 4 No 

f tri L nn ! ed Majn areaa ^^^1^ " 
p 



Smay Arresters 



5 " 3a7 a 1-">-h > Plant, Unit 1 
'* - 3a - "" 7B, a ,3-, 9 . H . 

n 2, Atlanta ' R "' tl11 ' ""' Nuclear 9 upport 



Dir.ctor. 



Reactor 



7903230134 



79/02/09.' 



g u 
' 79 -"' " Li """" "'V 



790a09024a DOCKET 50-338 S equa ,jah Nuclear Plant, Unit S 
Notifies that response to NRC 790109 Itr re bolted 
755551*""" U '" Jer 9Ei9m '= losing mill be provide b 
GILLELAND.J. E. Tennessee Valley Authority. 79/O2/05. lp. 

7902120109 DOCKET 50-329 S^uouah Nuclear Plant, Unit 2 
Responds to NRC 7B062B request far addl info re residual 
o"FaflR m P nEE ""' " e lncol 'P | "-*-'' *>*" Amend io 
OILLELAND, J. E. Tennessee Valley rtuthnrity, 79/03/O5. 13pp. 

790312017Q DOCKET 50-328 S eqil0 yah Nuclear Plant, Unit 2 

Presents schedule for responses to 79O119 request for addl 

01LLELAND, J. E. Tennessee Valley Authority. 79/02/07. Ip, 

7902210248 DOCKET 50-32B S Bq u y a h Nuclear Plant, Unit 2 
Forwards requested over.Heri dryings re interlock t, 
FCV Iq ? ? nd ; cation d "'n features for l.al.tion valves t. 
riric a L , t "i " Blt amend Df 'nstrumentation drawings. 
GILLELAND, J. E. Tennessee Valley Authority. 79/O2/14. lp. 

7903310256 DOCKET SO-33B B Bquoya h Nuclear Pl flnt , Unit S 
Responds to 790124 telephone request ft submits info on 

" p lnujEr sheu i Bid - Bactor ve " Bi 



,. 

01LLELAND, J. E. Tenneasee Valley Authority. 79/02/14. 



l p . 



7903320060 DOCKET SO-33B Seo.u D y a f, Nuclear Plant, Unit a 

Forwards responses to 78120Q l tr. Provides list of all Class 
IE safety-related equipment u/identi f ication of basi a for 

SlLLELAND 1 "S'^T 1 "' '<""*"' *- Ani-nd iO to F8AR 
OILLELAND, J. 0. Ten n es aaB v a ll 8 y Authority. 79/03/14. Spp. 

7702230061 DDCKET 50-326 S eq u 0y ah Nuclear Plant, Unit 2 

Infer th.t THADGC Pamphlet 3SO-30, - Interservice Procedures 

va lahSe ? nal , Sy %? e r 8lOPI71ent " '-"nc.d In NuSEO-Oa" 

,, . ln mlcT1 f i<:he form frnm NRC. 

.H.J. Division of Document Control. 7B/11/2O. Spp. 



3 ' 32a fl '1ll-h Nuclear Pl fln t, Unit 2 



AuihO.lt,. 



Nu C l 0a r Pj flnt) 



Q1LLELAND.J. E. Tennessee Valley Authority. 79/02/14. 24pp, 

79023BQ32A DOCKET SO-327 S 8qu0 y a h N ut l Bar Plant, Unit 1 
hJ I ""t int.ri. rept on P ot.nt?Il "".* s ""e wa t er 
mu" n ^ ain '"""t" initially reported 
; U "*i* ne>t rept h 790313 
E. T e m, e5Bee Va il D y Authprity. 7WOH/14. 3pp. 

7703300237 DDCKET 50-3S7 5e qUO yah Hue IMP P,a nt , Unit 1 

OILLELAUD, J. . T e nr, eEsaB Valloy Authority. 79/03/16. lp, 



OILLELflND.J.E. T Bn ne ia e B Valley Authority. 79/02/16, lp . 
790523032. DOCKET 50-337 S 0qUO yah Nuclear Pl fln t, Unit 1 

- 



ey Authority, 79/02/li. 



^' S^KET BO-M7 Sequouah Nuc l Ba r Plant. Unit 1 

t^f 4 re fire d * " - 



E. TenrtesBee Vallc tt Authority. 79/03/HO. lp. 

7903380337 DOCKET 50-327 S Bqu0 y a h Nuclear Plant, Unit 1 
,1^1 mil * f" C rfl " t concludes nine addl fi,; dwp.P. t, 
tight jdil fire door, ar B r e ,uir 9 d in contr^ t, .u!iIl.P V 

Tennessee Vall B y Authority. 79/02/2O 2pp, 

770S280353 DacKET SO-327 B.,o B .h Nucl.. r Plant, Unit I 

For^rds Pina rept r e poss lb l B onconi.pv.tivi pp..,ip|i. P 
r.l .- t, safety line b laM do m a n fl ]y B is. C B neliid5."u point. 
nTr 3l i 01UablB tr B5SBB in Po T p ipln9 Code/ 
D, J.E. Tennessee Valley Autharity. 79/02/23 2pp 



7902330041 DDCKET 30-328 9equo 3 h Nuclear Plant, Unit 3 

'*ll oo ca 7 T 2 """:? * f " WardS 790113 -v?"o t. 
Radiological Emergency Pl an " !, draft revisions which will 

be ncorporated before issuance of operatin Ucens for 

OII.P, iSn* 11 ;';*" Bvleu * i "" 1 comments. 

OILLELAND, J. E. Tennessee Valley Authority. 79/02/14. Ip. 



.,, 

OILLELAND, J.E. Tennessee Valleu Authority. 79/OH/03. 2pp. 

7902380342 DOCKET SO-32B Bequoyah Nuclear Plant, Unit a 
For^rd, responses to 781329 request for addl financial 

81LLELAND. J. E. Tennessee Valley Authority. 79/02/30. 60pp. 



Forard FS KET S "? 3B 8 ">-n Nuclear Plant. Unit 3 

FIHS . S r "?'? b " to NELrA Polic " N(r - a " 7 - 
FIELDER, J. Harsh & McLennan. Inc. 79/02/04. 2pp. 



- a " 32B B 1-h Nuclear Plant, Unit 2 

rMUMJ'for'.dV'r 1 : 10 " J FSAR ' sant in response to 790H7 
request for addl tnfo re tornado mi s*i 1 ... Overs! d drauina 

OILUELAND.J. E. Tennessee Valley Authority. 79/01/35. 6pp. 

7903010073 DOCKET 50-33B S B quoyah Nuclear Plant, Unit 2 
Amend 59 to F8AR. 
* Tennessee Valley Authority. 79/01/36. 168pp. 

79021B0120 DOCKET 50-328 Sequoyah Nuclear Plant, Unit 2 
Forusrds affidavit of svc for Amend 39 to FBAR. 
MILLS.L.M. Tennessee Valley Authority. 79/02/O3. 2pp. 

7902210031 DOCKET 50-328 Sequoyah Nuclear Plant, Unit a 
Lists project reviews for next five ACRS full committee 
meetings. 
CROCKER. L. P. Division of Project Management. 79/02/05. Spp. 

7903090107 DOCKET 50-33B Sequoyah Nuclear Plant, Unit Z 
Forwards IE Insp Repts 5O-327/78-42 b 50-33B/7B-2B on 
7B13I1-14.NO noncompl iance noted. 

MURPHY, C E. Region 2. Atlanta, Reactor Construction t. Engineering 

Support Dranch. 78/13/29. Spp. 



7902090116 DOCKET 50-328 Sequoyah Nuclear Plant, Unit S 

IE Insp Repts 5O-327/7B-42 !, 50-32B/7B-2B on 7B1211-14. No 
noncompl iance noted. Major areas inspec ted: instal lati on of 
safety-related mechanical components, reactor vessel internal 
quality records d safety-re lated pipe support sya. 
VAUL1SH, E, J. , DHYANT, J. C. Region a, Atlanta, Reactor 
Construction (. Engineering Support Branch. 75/12/39. 5pp 

7903130050 DOCKET 50-32B Sequoyah Nuclear Plant, Unit 2 
Forwards IE Info Notice 79-01 . "Bergen-Paterson Hydraulic 
Shock & Sway Arrestors (HSSA). " 

O'REILLY, d. P. Region 2, Atlanta, Office of the Director 
79/02/02. 2pp. 

790B2B0134 DOCKET 50-323 5en.uo<jah Nuclear Plant, Unit 2 
Forwards IE Info Notice 79-O3. "Limitorque Valve Geared 
Limit Switch Lubricant. " 

O'REILLY, J, P. Region 2, Atlanta, Office of the Director 
79/03/09. 3PP. 

7902310237 DOCKET 5Q-33B Seq.uoyah Nuclear Plant, Unit 2 

Forwards responses to Matls Engineerino Branch questions on 
nreservlce t. inservice insp dtd 7B120a.Hill incorporate matl 
Into FSAR by Amend 6O. 
OILLGLAND, J, E. Tennessee Valley Authority. 79/02/14. 24pp, 

79022B033C, DOCKET 50-33H Sequoyah Nuclear Plant, Unit 3 
Forwards first interim rept on potential excessive water 
hammer forces in main feeduater sys initially reported 
790119. Mill submit neit rept by 790313. 
OILLELAND, J, E, Tennessee Valley Authority. 79/O2/14. Hpp. 

79022B0237 DOCKET 50-328 Sequoyah Nuclear Plant, Unit 2 

Provides interim rept on deficiency in RHR pump 1A natural 
frequency. Reevaluation of RHR piping ays analysis confirms 
natural ys frequency uas lOhi. Throe piping supports were 
modified d pump support st if fened. Noule loads changed. 
OILLELAND, J. E. Tennessee Valley Authority, 79/02/16, Ip. 

79022SQ31B DOCKET 50-32B Soquoyah Nuclear Plant, Unit 2 
Forwards final rept on reactor coolant pump tie rod 
itnfaBdintnts. 
OILLELAND. J. E. Tennessee Valley Authority. 79/O2/16, Ip. 

79022B0321 DOCKET 30-32S Sequoyan Nuclear Plant,. Unit S 

Final rept on reactor coolant pump tie rod embedmentu. Add 1 
anchor bolts added to each of three embedments per unit ti 
stiffentr plates added to one of embedments per unit. 

* Tennessee Valley Authority. 79/O2/16. Ip. 

79022B0331 DOCKET 90-32B Bequoyah Nuclear Plant- Unit 2 

Forwards final deficiency rept re firs dampers fc fire doors 

in control t< auxiliary bldgs. 

OILLELAND, d. E. Tennessee Valley Authority. 79/OH/30. Ip. 

79032B0337 DOCKET SO-33B Soquoyah Nuclear Plant, Unit 3 
Final deficiency rept concludes nine addl fire dampers & 
eight addl fire doors are required in control b auxiliary, 
bldgs. * 

* Tinneisee Valley Authority. 79/02/2O, 2pp. 

7902280353 DOCKET 50-328 Sequoyah Nuclear Plant, Unit 2 

Forwards final rept re possible unconaervfltive pressuriier 
relief & safety line bloudoun analysis. Concludes all points 
in lines meet allowable stresses in Power Piping Code. 
GILLELAND, J. E. Tennessee Valley Authority. 79/03/32. 2pp. 

7902030022 DOCKET 50-329 Midland Plant, Unit 1 

Bumm*riis 7B12I1 appeal meeting re itaff position on cold 
shutdown capability psr SRP (NUREO-75/OS7), fievi slon 1 to 
Section 3. 4. 7. Appl leant response is Insufficient & matter 
remains unresolved. 
HODD.D. Light Water Reactors Branch 4. 79/01/17. 17pp. 

7902010179 DOCKET 30-329 Midland Plant, Unit 1 

Amend 58 to application for const permits & operating 
license*. Discusses terrestrial ecology, electric transmission 
facilities & avoidance & mitigation archaeological sites on 
Tlttabawasset to Kenowa/Thetford transmission line. 
* Consumers Pouier Co. 79/01/89. 50pp. 

7903130061 DOCKET 30-339 Midland Plant, Unit 1 

Requeltt addl info by 790321 re floodplaln mgt to continue 

review of application for operatinn license. 

REGAN, W. H. Environmental Project Branch 2. 79/O1/31. 3pp. 



DOCKETED ITEMS 



76 



7902150409 DOCKET 50-329 Midland Plant. Unit 1 

"Pressure Vessel Flusnce Analysis Par 177 Fuel flssi 

Reac tors. " 

* Consumers fouler Co BAU-14B3. 7B/04/3O. 6Bpp 



nbltj 



7902200064 DOCKET 50-339 Midland Plant, Unit 1 

Forwards "Delaval Test Rept.Delaval Standby Generator" 
Revision t dtd 7S112B in response to NRC request for addl 
info. Rept available in Central Files. 
HDWELL. B.H. Consumers Power Co. 79/O2/OB, If. 

7702200061 DOCKET SO-329 Midland Plant, Unit 1 

Forwards suppl electrical Sr instrumentation control drawings 
t. ref tables per Reg Guide 1 . 70, Rcvi sion 2. Replaces previous 
drawings. W/150O drawings available in Central Files. 
HOWELL.S. H. Consumers Power Co. 79/02/Q9. Ip. 

7902230093 DOCKET 50-339 Midland Plant, Unit 1 
Forwards advance copy of Revision IB to F5AR. 
HOHELL.B.H. Consumers Poiuer Co. 79/02/16. 798pp. 

7903010174 DOCKET 50-329 Midland Plant, Unit 1 

Forwards Amend 5B to application for const permit !< 

operating licenses 

HOHELL.a.H. Consumers Pouer Co. 79/01/39. 3pp. 

7902060198 DOCKET SO-33? Midland Plant. Unit 1 

Forwards affidavit confirming distribution of Amend 5S 
(Revision 5 to Envirnn Rept) to application for const 
permits (, licenses. 
DAOUD, L, Consumers Power Co. 79/03/02. 4pp. 

79021401B2 DOCKET 30-339 Midland Plant. Unit 1 

Responds to 7B1O1I request for addl Info for review of 
environ rept d forwards Rept 1966, "Archaeological t< 
Historical Investigations uf Floodplan Area, Midland, Ml, " dtd 
Jan 1979. prepared by Commonwealth Assoi: i atos, Inc. 
HDWELL, 8. H. Consumers Pouier Co, 79/Q2/OB. Ip 

79021401B7 DOCKET 50-329 Midland Plant, Unit 1 

Rapt 1966: "Archaeological !. Historical Investigations of 
Floodplain Area. Mid land, Ml. " 

FITTING, J. E. , LARSEN, C. E. , KERN, J. R. Consumers Power Co 1766 
79/01/31, 69pp. 

7902230061 DOCKET 30-339 Midland Plant, Unit I 

Informs that TRADOC Pamphlet 350-30, " In t erservlcD Procedures 
for Instructional Sys Development" referenced in NUHEG-O219 
is available in mitvoficlie form from NHC, 
DEBAU.W.J, Division of Document Control. 7G/11/20. 3pp 

7901220336 DOCKET 50-329 Midland Plant, Unit 1 

Forwards NUREO/CR-400, "Risk Assessment Review Group Ftept to 

the US NRC" for parties of the proceed ing. NUC developing 

policy statement m ropt. 

OLMSTEAD, W. J. Office of tho Eiccutivc Legal Director. 79/01/10 

Ip. 

7902230084 DOCKET 30-329 Midland Plant, Unit 1 

Environ Rept (3 vols) t, FBAR (24 vols) will be sent to Wit 

Marshall, if desired. 

QIBuBiM.E. lnfiam, Lincoln !. Uealo. 79/01/10, Ip. 

79022S0203 DOCKET 50-329 Midland Plant, Unit 1 

Notification of appearance ay Ptt Murphy, atty, on behalf of 

Consumers Power Co. 

MURPHY.P.N, Isham, Lincoln S. Deale. 79/01/31. Ip. 

7903SB0203 DOCKET 50-329 Midland Plant, Unit 1 

Notification of appearance ay JE Clpr iano, attu. on behalf of 

Consumers Power Co. 

CIPRIAND, J. E. Isham. Lincoln (, Qeale. 79/03/02, Ip. 

7903220209 DOCKET 30-329 Midland Planb. Unit 1 

Notification of appearance liy L Dnoud, attu, on behalf of 
Consumers Power Co. Certi f icate of Svc end. 
DAOUD.L. Consumers Power Co. 79/01/23, 3p-p. 

7902200243 DOCKET 50-329 Midland Plant, Unit 1 

Terminates special proceeding w/prejudite & withdraws all 

charges. Approves t, orders implementation of terms one 

through eight of 7B0321 motion & stipulation. 

CHILK,S.J. Office of the Secretary of Ihe Commission, 79/Q2/C-2 

6pp. 



7902130403 DOCKET 50-329 Midland Plant, Unit 1 

Forwards rept BAH-14B5 dtd June 1979, "Pressure Vessel 

Fluenc* Analysis for 177 Fuel Assembly Reactors" supporting 

utll discussion on reactor veiGel overpressuriiation at low 

temp. 

HOWELLi B. H. Consumers Power Co. 79/02/08. Ip. 



7903330232 DOCKET 30-339 Midland Plant, Unit 1 

Consumer Pouier CD'S motion for eitension of time until 
790330 to submit info re disclosure due to recent retention 
of counsel. Certificate of Bvi end 

CHARNGFF.O., REYNOLDS, U. B. shaw, Pitt-nan, Potts, ! Troubridg, 
79/O2/O5. 3pp, 



DOCKETED ITEMS 



7503220340 DOCKET 50-337 Midland Plant, Unit ! 

Notification of appearances ay Charnoff t. WD Reynolds on 
behalf of Consumers PoLjer Co Certificate of Svc and. 
CHAHNOFF.G , REYNOLDS. W E. Stiau, Pittman, Potts, t, Troubridge. 
79/03/05 2pp 

7^02220219 DOCKET 50-325 Midland Plant, Unit 1 

Order granting Bitension of tine to Consumers Power Co I> all 
parties until 770330 to provide info re disclosure issue. 
MILLEH.M E Atonic Safety and Licensing Eoard Panel. 79/O2/09. 

7903010053 DOCKET 30-329 Midland Plant, Unit 1 

Forwards AasniJ 37 to app 1 Ication. FSAR Revision 17. which 
suppls portion of Revision 17 submitted 7901 10. Provides addl 
info ti ref drauings. 
HCWELL, 5 H Consumer* Pouer Co. 77/01/39. 3pp. 

7902010056 DOCKET 50-327 Midland Plant, Unit 1 

A.iiena 57 to app 1 (cation, FSAR Revision 17, submitted in 
support of const permits ti license applications. Includes 
addl info & nil nor Chang es. 
Consumers Power Co. 79/01/25. 700pp. 

790304,0240 DOCKET 50-339 Midland Plant. Unit 1 

Forwards Certificate of Svc for Amend 37 (Revision 17 to 

FSflR) Co application for const permits. 

BACON, J. L Consumers Power Co. 79/02/01. 2pp. 

790223QOB2 DOCKET 50-329 Midland Plant, Unit I 

Forwards advanced copy responses to NRC 790118 1 tr 
roqutstiro addl info. Will respond to remaining questions << 
positions by 790220. Contains neu S, revised FSAR page* marled 
as Revision IS. 
HOWELL, B. H. Consumers Power Co. 79/02/O2. 150PP. 

7902210031 DOCKET 50-329 Midland Plant. Unit 1 

Lists project reviews for ne>t five ACRS full committee 

meetings. 

CROCKER. L, P. Division of Project Management. 79/02/05. 2pp. 

7703240014 DOCKET 50-327 Midland Plant, Unit 1 

Forward* re Insp Bepti 50-329/78-16 t. 50-330/78-li on 
731113-16 !. notice of deviation. 

HEISHMflfV. R.F. Region 3, Chicago, Reactor Construction & 
Engineering Support Branch. 7S/12/36. 2pp. 

7903260016 DOCKET 50-329 Midland Plant, Unit 1 
Notice of deviation from Insp on 7B1113-16 

HEISHMAN.R.F Region 3. Chicago. Reactor Construction t, 
Engineering Support Branch. 70/12/15. Ip. 

7703260020 DOCKET SO-329 Midland Plant, Unit I 

IE Imp Repts 5O-329/7B-16 t 50-330/7Q-li on 7B1113-li 
Noncompliance noted: deviation ra safety-related piping sys. 

Reaion3 ' Ch " 39 " ",. 



7902230320 DOCKET 50-329 Midland Plant, Unit 1 

Forward! IE !nsp Repts SO-329/7B-IB t, 5Q-330/78-1B on 
781130-1201. No noncompliance noted 

HEISHHAN.H.F Region 3. Chicago, Reactor Construction !, 

Engineering Support Branch. 79/01/12. Bpp. 

79022H0224 DOCKET 30-329 Midland Plant. Unit 1 

IE Insp Repts 50-339/78-IB t, 50-330/7B-1B on 7B1130-1201 No 
noncompliance noted. Major areas inspected: qual itu records 
review for electrical cables I, components 

S:I.U:SE^ 

7903120106 DOCKET SO-32? Midland Plant. Unit I 

ci!!!?t r i i *B IE J ? f N ? tice 79-01. "Bergen-Paterson Hydraulic 
Shock 4 Sway Arrestors IHSSA). 

KEPPLER.J.O. Region 3. Chicago, Office of the Director. 79/02/02. 

7902260092 DOCKET 30-329 Midland Plant. Unit 1 

discuss'sta^ """"""an re 790207 meeting at site. Will 
Hi! ^ ? **!.*"' "!""!.* '"" P"_9ra m , status & results of 



n'^ ? e ? 10n 3 ' Chl "- Rctor Construction t, 
ng Support Branch. 79/02/03. Ip. 



7903230090 DOCKET 30-327 Midland Plant. Unit 1 

Responds to NFIC 701226 Itr re deviations notod in IE Innp 
Repts SO-327/7B-l t, 50-330/7S-16. Correc ti ve ac i ona; p tp Inn 
fabricator d supplier are being consulted r* V-notch chnrpy 
test specimen. USB of A8ME Code will be Bvnluatod. 
HDWELL.S.H. Consumers Paiuer Co, 79/01/27. 4pp. 

7702310300 DOCKET 50-339 Midland Plant, Unit I 

Forwards IE Bulletin 79-01, "Environ Qualification at Class 
IE Equipment, " W/ltst of 11 systematic evaluation program 
plants far uhich no action is required, 

KEPPLER.J.O. Region 3, Chlcaoo, Office of the Director, 79/02/O9. 

IP- 

7902270332 DOCKET 30-329 Midland Plant, Unit t 

Forwards IE Info Notice 79-03. "Limi torque Valve Geared 

Limit Suitch Lubricant. " 

KEPPLER.J.O, Region 3, Chicago, DPflco of the Director. 79/02/09. 



77020202flS DOCKET 30-329 Midland Plant, Unit 1 

Forwardi Dochtel noncnnf orraonce ropts, Bochtol OA Findings, 
Bechtel OA requests, mgt corroctivo action repts, DEiM 
nonconformanco repts & Consumers Power Co nonconformancB 
repts written or closed during Dec 197B. 
HOHELL. S. H. Consumers Pouier Co. 79/01/23, 220pp. 

7902010360 DOCKET 50-329 Midland Plant, Unit 1 

Act receipt of interim rept dtd 790113 on small broak 

analysis. 

HEISHMAN.R.F. Region 3, Chicago, Reactor Conatruction & 

Engineering Support Branch. 79/01/23. Ip, 

7902030074 DOCKET 50-329 Midland Plant, Unit 1 

Final rept re Class IE station battery reportable design 
deficiency. Deficiency corrected by release of approved 
design channe adding Isolation barn to battery racks, 
HOWELL, S. H, Consumers Pouior Co. 79/01/31. Ip. 

7V02050219 DOCKET 30-329 Midland Plant, Unit 1 

Interim rnpt on reactor bldg spray piping support ut/locol 
pipe streisBs at point of anchor attachment eicaodino codn, 
Finds six anchor* for each unit have stresses apprni 6X over 
code allowables. Unit rept will be 770333. 
HOWELL. S, H. Consumers Power Co. 79/02/01, 2pp, 

7903280352 DOCKET 50-329 Midland Plant, Unit 1 

Ack receipt of interim rept dtd 790117 ro component 
qualification test documentation re-review. 

HEISHHAN, R. F. Region 3, Chicagoi Reactor Construction h 

Engineering Support Branch. 79/02/02. Ip, 

7903290561 DOCKET 90-329 Midland Plant, Unit 1 

Ack receipt of interim rept dtd 790119 ro electrical 
penetration assembly. 

HEIBHHAN.R.F. Region 3, Chicago, Reactor Conatruction & 

Enginaerino Support Branch. 79/02/03. Ip. 

7902030022 DOCKET 30-330 Midland Plant, Unit 3 

Summai-iies 781211 appeal meeting re staff position on cold 
shutdown capability per 8RP (NUREQ-7S/OB7) , Revision 1 to 
sect on 3. 4. 7. Applicant response Is insufficient fc matter 
remains unresolved. 
HQOD.D. Light Water Reactors Branch 4. 79/01/17. 17pp. 

7902010179 DOCKET 5O-330 Midland Plant, Unit 2 

Amend 5B to application for const permit, t, operating 
}???!? i""!!! terr " trl "l ^ology. elflctric transmissiQn 
rtSJii ^oidance * mitigation archaeological sites on 

Tittabauassee to Kenowa/Thetfc.rd transmission line 
" Consumers Pouar Co. 79/01/29. SQpp. 

7902130061 DOCKET 50-330 Midland Flint, Unit S 

rev^ey of^^n 11 ^,^ i"" " ""P-in i>Qt to contlnu, 

HMAM u i li "*J n foT P"ating license. 

REOAN.W. H. Environmental Project Branch S, 79/01/31. 3pp. 

79021S0403 DOCKET 50-330 Midland Plant, Unit 2 

Forwards rept GAW-14B5 dtd June 1979, "Pressure Vessel 
Fluence AnalyEls for 177 Fuel Assembly Reactors" supporting 
util discussion on reactor vessel overpreBsurl tation at low 

HOWELL, S, H. Consumers Power Co. 79/02/OB. Ip. 



79022300B6 DOCKET 50-329 Midland Plant, Unit 1 

.S^ 11 *- ! " 127 Ur """"*> RC of steps t.t.n to 
" tei ^ IE ' nap Repti 50-329/78-16 I 



7902150409 DOCKET 50-33O Midland Plant, Unit 2 
Reactor"''"" 5 " 1 Flutni:t Anall J aiB ^ 1" Fw 
Consumers Power Co, DAW- MBS. 7B/06/30. 



l Assembly 
ABpp. 



7902200064 DOCKET SO-330 Midland Plant, Unit 2 

RevTs^n i'^ir^.Tr* "Pt'DUv.J Standby Generator" 
Infl n* 1 d ", 7B 12B ln response to NRC request for addl 
unucl P avallable ^ Central Files. 
HOHELL, B. H. Consumers Power Co. 79/02/OB. Ip. 



DOCKETED ITEMS 



77 



7902SOOO61 DOCKET 90-33O Midland Plant, Unit 2 

Forwards tuppl electrical It instrumentation control drawings 
t rat tab leu pur Reg Guide 1, 70, Revi i ion 2. Replaces previous 
drawings, W/1300 drawings available In Central Files. 
HOWELL, B. H. Consumers Pouier Co. 79/O3/09. tp. 



7902010053 DOCKET 30-330 Midland Plant, Unit 2 

Forwards Amend 57 to appl ication, FSAR Revision 17. which 
suppls portion of Revision 17 submitted 7901 19. Provides 
info & ref drawings. 
HDUELL, 9.H. Consumers Pouier Co. 79/01/29. Sop. 



7902230073 DOCKET SO-33O Midland Plant, Unit 3 
Forwards advance copy of Revision IB to FBAR. 
HGWELL, S. H. Consumers Pouiur Co. 79/02/16. 79Bpp. 

7902010174 DOCKET 90-330 Midland Plant, Unit Z 

Forwards Amend SB to application for const permit i 

operating licenses. 

HDWEU-. B. H. Consumers Power Co. 79/01/29. 2pp. 

7902060198 DOCKET HO-330 Midland Plant, Unit 2 

Forwards affidavit confirming distribution of Amend 58 
(Revision S to Environ Rept) to application for const 
permits b licenses. 
DAOUD, L. Consumers Power Co. 79/02/02. 4pp. 

79021401B2 DOCKET SO-330 Midland Plant, Unit 2 

Responds to 7B1011 request for addl info for review of 
environ rpt fc forwards Rept 196 6, "Archaeological ( 
Historical Investigations of Floodplan Area, Midland, MI, " dtd 
Jan 1979, prepared bg Commonwealth ABIDE iates, Inc. 
HOWELL, S.H. Consumers Poiuor Co. 79/02/OB. lp, 

79021401B7 DOCKET 90-330 Midland Plant, Unit 2 

Rept 1966: "Archaeological b Historical Investigationi of 
Floodplain Area, Mid land, Mr. " 

FITTINQ, J. E. , LARBEN, C.E. , KERN, J. fi. Consumers Power Co. 1966. 
79/01/31. 69pp. 

7902330061 DOCKET 50-330 Midland Plant, Unit 2 

Informs that TRAODC Pamphlet 330-30, "InterBHrvi'ce Procedures 
far Instructional Bgs Development" referenced in NUREQ-0219 
Is available in microfiche Form from NRC. 
BEBAW.H.J. Division of Document Control. 70/11/20. 3pp. 



790H010056 DOCKET 50-330 Midland Plant. Unit 2 

Amend 37 to app 1 ication, FBAR Revision 17, submitted in 
support of const permits t< license applications. Includes 
addl info !< minor changes. 
Consumers Pouor Co. 77/01/25. 700pp. 

7902060240 DOCKET 50-330 Midland Plant, Unit 2 

Forwards Certificate of Svc for Amend 57 (Revision 17 to 

FBAR) to application for const permits. 

BACON, J. L. Consumers Power Co. 79/02/O 1 . 2pp. 

7903230092 DOCKET 30-330 Midland Plant, Unit 2 

Forwards advanced copy responses to NflC 79CH1B Itr 
requesting addl info. Hill respond to remaining luestiona d 
positions bg 790220. Contains neu t, revised FSAR pages marked 
as Revision IB. 
HOHELL, B. H. Consumers Power Co. 79/02/03. 150PP. 

7902210031 DOCKET 90-330 Midland Plant, Unit 3 

Lists project reviews for next five ACRS full committee 

meetings. 

CROCKER. L. P. Division of Project Management, 79/O2/O3. 



3pp. 



7902260014 DOCKET 90-330 Midland Plant, Unit 3 

Forwards IE Insp Repts 50-329/7B-16 t. 9Q-33O/70-I6 on 
781113-16 B, notice of deviation. 

HEISHMAN.R. F. Region 3, Chicago, Reactor Construction 4 
Engineering Support Branch. 70/12/26. 2pp. 

7705260016 DOCKET 90-330 Midland Plant, Unit 2 
Notice of deviation from insp on 781113-16. 
HEI8HMAN, R, F. Region 3, Chicago, P.eac tor Construe tion 
Engineering Support Branch. 78/12/19, lp. 



79013303B6 DOCKET 90-330 Midland Plant, Unit 2 

Forwards NUREO/CfI-400, "Risk Assessment Review Group Rept to 

the US NRC" for partis* of the proceeding. NRC developing 

policy statement re rapt. 

OLMBTEAD, W. J, Office af the Eiecutlve Legal Director. 79/01/1O. 

lp. 



79022600BO DOCKET 50-330 Midland Plant. Unit 2 

IE Insp Rupts 50-329/70-16 t, 90-330/79-16 on 781113-16. 
Noncomplianco noted: deviation re safety-re lated piping sua 
LEE.E. W. , DAN1EL60N, D. H. Region 3, Chicago, Office of the 
Director, 7H/I2/19. 9pp. 



79Q22300B4 DOCKET 90-330 Midland Plant, Unit S 

Environ Rept (3 vols) S, FBAR (21 vols) will be sent to <riH 

Marshall, If desired. 

OIBBB, M. E, Isham, Lincoln & Deale. 79/01/10. lp. 



7903380220 DOCKET 90-330 Midland Plant, Unit B 

Forwards IE Insp Repts 50-329/78-18 l< 50-330/7B-1B on 
7B1 130-1201. Wo noncampliance noted. 

MEIBHMAN, R. F. Region 3, Chicago, Reactor Construct!* 
Engineering Support Branch. 79/01/12. 2pp. 



7903530203 DOCKET 90-330 Midland Plant, Unit 2 

Notification of appearance bg PM Murphy, atty, tm behalf of 

Consumers Power Co. 

MURPHY. P.M. Isham, Lincoln & Beale. 79/01/31. lp. 

7903320205 DOCKET 90-330 Midland Plant, Unit B 

Notification of appearance by JE Cipriono, attg, on behalf of 

Consumers Power Co. 

CIPRIANO, J. E, Isham, Lincoln t. Boale. 79/03/02. lp. 

7902220209 DOCKET SO-330 Midland Plant, Unit 2 

Notification of appearance by L Daoud, attg, on behalf of 
Consumers Power Co. Certificate of Svc end. 
DAOUD, L. Consumers Pownr Co. 79/01/23. 3pp. 

79033B0243 DOCKET SO-330 Midland Plant. Unit 2 

Terminates special proceeding ui/prejudlce & withdraws all 

charges, Approves b orders Implementation of terms one 

through eight of 780321 motion d stipulation, 

CH1LK, B. d. Office of tha Secretary of the Commission. 79/02/02. 

6pp. 

7902220332 DOCKET 50-330 Midland Plant, Unit S 

Consumer Powar Go's motion for extension of time until 
790330 to submit info re disclosure due to recent retention 
of counsel. Certificate of Svc encl. 

CHARNOFF.O., REYNOLDS, W. B. Shaw, Plttman, Potts, ft Trouibridae. 
79/OS/05. 3pp. 

7902220240 DOCKET 30-33O Midland Plant. Unit 2 

Notification of appearances by O Charnoff & HQ Reynolds on 
behalf of Consumers Power Co. Certificate of Bvc encl. 
CHAHNOFF, 0. , REYNOLDS, W. 0. Bhaul, Plttmam Potts, & Troworidge. 
79/02/03. Hpp. 

7903330219 DOCKET 90-330 Midland Plant. Unit S 

Order granting extension of time to Consumers Power Co t< all 
parties until 790330 to provide info re disclosure lime. 
MILLER, M. E. Atomic Safety and Licnnsing Doard Panel. 79/02/09. 



7902SS0224 DOCKET 90-330 Midland Plant, Unit i 

IE Insp Reptl 90-3a9/7B-10 t, 30-330/78-1B on 7G1130-12O1 No 
noncomplionce noted. Major areas inspec ted : qual itu records 
review for electrical cables & components 

MAXWELL. O.F., BARRETT, P. A. , BPES9ARD, It. L, Region 3, Chicago, 

Reactor Construction t, Engineering Support Branch. 79/O1/OR 4pp. 

7902130106 DOCKET 50-330 Midland Plant, Unit 2 

Foru/ards IE Info Notice 79-01, "Bergsn-PaterBon Hydraulic 
Shock & Sway Arrestars (HB3AI. 

KEPPLER.J.O. Region 3, Chicago, Office of the Director 

lp, 



79/03/02, 



7902360072 DOCKET 90-330 Midland Plant, Unit 2 

Confirms phone conversation ro 790207 meeting at site Will 
discuss status of const inap program, status & results of 

overview program" !< changes in Region 3 mgt & sup B rvisont 
personnel, r ' 

HEI8HMAN. R. F. Region 3, Chicago, Reactor Construction & 
Engineering Support Branch. 79/03/09. lp. 

7902230036 DOCKET 50-330 Midland Plant, Unit 3 

Ack receipt of 7901S7 Itr informing NHC of steps taken to 
correct deviations notsd in IE Inap Repts 50-329/78-16 fc 
30 330/7B 16. 

HEISHMAN, R, F. Region 3, Chicago, Reactor Construct Ion t, 
Engineering Support Branch. 79/02/06. lp. 

7902230090 DOCKET 50-330 Midland Plant, Unit 2 

Responds to NRC 7SI226 Itr re deviations noted In IE Insp 
Repts 90-329/78-16 (, 90-330/7B-16. Corrective ac ions: p i p ing 
fabricator d supplier are being consulted r H V-notch charnn 
test specimen. Use of A8ME Code mill be evaluated, 
HOWELL, B, H. Consumers Power Co. 79/01/27. 1pp. 

7902210200 DOCKET 90-330 Midland Plant, Unit 2 

Forwards IE Bulletin 79-01, "Environ Qualif ieation of Cla* 
IE Equipment. H/llst of U systematic evaluation program 
plants far which no action Is required. 

KEPPLEF1,J.O, Region 3, Chicago, Office of the Director. 79/02/0= 
lp. 



78 

7902270332 DOCKET 30-330 Midland Plant, Unit 3 

Forwards IE Info Notice 79-03, "L imi torque valve Qeared 

Limit Switch Lubricant." 

KEFPLeR.J.G. Region 3. Chicago. Office of the Director. 



DOCKETED ITEMS 



7902370399 DOCKET 3O-331 Duane Arnold Energy Center 

Forwards 790222 "Duano Arnold Energy Ctr Rec irculation 
Inlet Safe-End Repair Program Suppl," augmenting repts of 
7B0731 (- 7B12Q0. 
LIU.L. Iowa Electric Light & Power Co. 79/02/22. Ip. 



7902D20245 DOCKET 50-330 Midland Plant. Unit 3 

Forwards Bechtel nonconf ormance repts, Bechtel OS finding! 
Bechtel GA requests, mgt corrective action repts, BtU 
nonconf ormance repts t Consumers Power Co nonconf ormance 
repts written or closed during Dec 1976. 
HOHELL, S. H. Consumers Power Co. 79/01/25. 220pp. 



7902B70372 DOCKET 30-331 Duane Arnold Energy Center 
"Reclrculation Inlet 'Safe-End Repair Program Suppl." 
Discusses acceptability of recirculat ion safe-end welds 
3 b 6, procedure for recovery of one lead plug. loose parti 
analysis b crack growth. 
loiua Electric Light fc Power Co. 79/02/22. 112pp. 



7902010360 DOCKET 50-330 Midland Plant, Unit 2 

Ac* receipt of interim rept dtfl 790112 on small break 

analysis 

HEISHMAN.R. F. Region 3, Chicago, Reactor Construction ti 

Engineering Support Branch. 79/01/S2. lp. 



79022B0300 DOCKET SD-331 Duane Arnold Energy Center 

Requests eitension of required completion data for operator 
training ti written exams to 79O3Q1, Include! Class II review 
action fee. 
TUTHILL.S, J. Iowa Electric Light i. Poiuer Co, 79/02/B3. lp. 



7902050074 DOCKET 90-330 Midland Plant, Unit 2 

Final rept re Class IE station battery rejiortable design 
deficiency. Deficiency corrected by release of approved 
design change adding Isolation bars to battery racks. 
KOWELL.9.H. Consumers Power Co. 79/01/31. lp. 



7902010303 DOCKET 50-331 Duane Arnold Energy Center 

Forwards Imp Rept 90-331 /7G-29 on 781121-22 *. notice of 

violation, 

DAVia.A.B. Region 3, Chicago, Fuel Facility h Material* 

Branch. 70/1S/S0. 2pp. 



7902050319 DOCKET 50-330 Midland Plant, Unit a 

Interim rept on reactor bldg spray piping support u/ local 
pipe stresses at point of anchor attachment exceeding code. 
Finds six anchors for each unit have stresses approi 67. over 
code allowables. Neit rept ui 1 1 be 790323. 
HOHELL, S. H. Consumers Power Co. 79/02/01. 2pp. 

79023B0932 DOCKET 50-330 Midland Plant, Unit 2 

Ac* receipt of interim rept dtd 790117 re component 
qualification test documentation re-review. 

HEISHMAN.R. F. Region 3. Chicago, Reactor Construction t, 

Engineering Support Branch, 79/02/O2. lp. 



7902010310 DOCKET 30-331 Duano Arnold Energy Center 
Notice of violation from inap on 701131-22. 

* Region 3, Chicago, Fuel Facility S. Materials Safety Branch. 

78/12/26. lp, 

7902010313 DOCKET 30-331 Duane Arnold Energy Center- 
IE Insp Kept 30-331/70-29 on 7B1 121-B2, Noncomp 1 lane* noted: 
testing of some effluent monitoring ays not done at required 
frequency tt failure to analyie liquid effluent (ample prior 
to releass. 

MILLER.D.E., FISHER, H. L. Region 3, Chicago, Fuel Facility li 

Materials Safety Branch. 78/12/26. 7pp. 



79022B0361 DOCKET 50-330 Midland Plant, Unit 3 

Ack receipt of interim rept dtd 79D115 re electrical 
penetration assembly. 

HE18HHAN,n. F. Region 3, Chicago, Reactor Construction t. 

Engineering Support Branch. 79/03/02. lp. 

7902220119 DOCKET 30-331 Duane Arnold Energy Center 

Inform! that TRADOC Pamphlet 3SO-30, "Interservice Procedures 
for Instructional Sys Development" referenced in NUflEO-0219 
is available in microfiche form from NRC, 
BESAH.W. J. Division of Document Control. 79/01/09, 2pp. 



7902260093 DOCKET 50-331 Duane Arnold Energy Center 
Forward* IE Imp Rept 50-331/7B-34 on 701210. 
KEPPLER.J. 0. Region 3i Chicago, DfPlce of the Director. 

2pp. 



7902260097 DOCKET BO-33I Duane Arnold Enerou Center 

IE Inp Rept 30-331/7B-34 on 701218. No noncomp 1 lance noted. 
Major areas inspected: welding' deficiencies. 

KEPPLER, J.O., HEISHMAN, R, F. , FDBTER.J.E. Regions. Chicago. 

Offica of the Director. 79/01/12. 9pp. 



7903020166 DOCKET 50-331 Duane Arnold Energy Canter 
Informs NHC that const tt checkout of hardware mot 



(out of hardware /nods committed 
to in modified amended security plan will not be completed 
on 790223. Forwards proposed compensatory measures. Details 
withheld Iref 10CFR2. 790). 
LIE.L. lotua Electric Light t Power Co. 79/01/19. lp 

7902040281 DOCKET 30-331 Duane Arnold Energy Center 

Informs of second delay in submlttal of fire haiard analysis 
due to need for revisions. Present schedule will have no 
effect on completion of mod listed in Table 3. 1 of license 
amend SER. 
LIU.L, Iowa Electric Lijht t. Power Co. 79/01/30. lp. 



79020B0239 DOCKET 50-331 Duane Arnold Energy Center 
Submits copies of plant security project schedule. 
LIU,L. loua Electric Light & Poiuer Co. 79/02/O1. 



7pp. 



7905120009 DOCKET 50-331 Duane Arnold Energy Center 

Forwards IE Info Notice 79-01, "Dergen-Paterson Hydraulic 

Shock t< Buiay Arrestors (HS9A), 

KEPPLER.J. 0. Region 3, Chicago, Office of the Director. 



7902210207 DOCKET 50-331 Duane Arnold Energy Center 

Forwards IE Bulletin 79-01, "Environ Qualification of Clasi 
IE Equipment. " U/list of 11 systematic evaluation program 
plants for which no action is required. 

KEPPLER, J.O. Region 3. Chicago, Office of the Director. TT/QS/QV. 

IP- 

790S370330 DOCKET 30-331 Duane Arnold Energy Cinter 

Forwards IE Info Notice 79-03. "Limitorque Valve Geared 
Limit Switch Lubricant." 

KEPPLER, J.O. Region 3, Chicago, Office of the Director. 79/02'O9. 

If. 



7902310220 DOCKET 50-331 Duane Arnold Energy Center 

Forwards Endorsement 39 to Policy NF-2I4 (, Endorsement 32 to 

Policy MF-72. Endorsements repmsent advance premium, std 

premium t, reserve premium endorsement for 1979. 

LOUENSTEIN.R. Lowenstein, Newman, Reis, Aielrad b Toll 79/02/15 

3pp. 



79022803B5 DOCKET 50-331 Duane Arnold Energy Csnter 

As followup to NRC 7SI115 reque.t for submittal of Offsite 
Doit Calculation Manual for approval, forwards guidelines for 
general contents of manual. 

Assistant Director for Engineers S, Projects. 
5p p. 



7902220099 DOCKET 30-331 Duane Arnold Energy Center 
Forwards monthly operating rept for Jan 1979. 
HAMMOND, E. L, Iowa Electric Light & Poiuer CD. 79/02/15. lp. 



7902320101 DOCKET 30-331 Duan Arnold Eneroy Center 
Monthly operating rept for Jan 1979. 
VfWSICKEL,.J. Iowa Electric Light ti Pouier Co. 79/02/11. 



Bop. 



7703030239' DOCKET 00-331 Duane Arnold Eneroy Center 
Forwards LER 70-036/Q3L-0. 
HAMMDND.E.L. Iowa Electric Light & Pouier Co. 79/01/26. lp. 



7902220237 DOCKET 90-331 Duane Arnold Energy Center 
Responds to 790111 request for review of paper "Vent 
Clearing During Simulated LOCA in a Mark I BUR 
Pressure-Suppression Sys." Recommends paper be accepted for 
pub 1 icatlon. 
GRIMES, C. Plant Systems Branch. 79/01/31. 2pp. 

7902000195 DOCKET 50-331 Duane Arnold Energy Center 

Submlti Dec 197Q program activity review. comprised of info 
from .elected .ectiona of monthly rept, w/section on contract 
t billing status removed. Lists meetinjs held & provides 
task-by-task activity summary. 

79/Ss/05 J ' loo" 6 "' E1 " trlt C -'N"<1'- Enersy Products Div. 



7902020240 DOCKET 90-331 Duane Arnold Energy Center 

LER 7H-036/03L-0 on 781227: core loading *as conducted with 
standby diesel generator 10-21 Inoperable iu/o testing 
redundant generator 10-31. Caused by misunderstanding of Tach 
Spec requirements. 
VAN SICKEL. J, louia Electric Light t< Power Co. 79/01/E6. lp. 

7902120156 DOCKET 50-331 Duane Arnold Energy Center 

Forwards final version of "Metallurgical Investieation of 
Cracking in Reactor Vessel NonU Safe-End." Photographs b 
supporting documentation end. 
L1U.L. Iowa Electric Light S, Payer Co. 79/01/30. lp. 



DOCKETED ITEMS 



79 



7'902t201i4 DOCKET 30-331 Duane Arnold Energy Cantor 

"Metallurgical Invmti jation of Cracking in Reactor Vessel 
Noula Bafe-End. " 

BUROMARD. H. C. , BURBLE, A. J. Iou Electric Light b Power Co. 
8MRIOa~93Q9-'001. 78/12/36. 123pp. 



79Q20500B6 DOCKET 30-333 Jamas A. FitiPatritk Nuclear Pouter Plant 
Ack receipt of 79Q1O5 1 tr informing NRC of steps taken to 
correct violation noted in IE Inap .Flept 5O-:)33/7[3-<l. 
DRIER, B. H. ficglon 1, Philadelphia, Office oP tfie Dircctor. 

79/01/17. lp. 



DOCKET SO-332 Barnwell fUprocBssino Plant 
Forwards IE Info Notice 79-02, "Attempted Eitortlnn - Loin 
Enriched U. " 

O 'RE1LLY. J. P. Region 2, Atlanta, Office nf the Director. 

79/02/02. lp. 

7903S80I19 DOCKET 30-333 Jams* A. FitiPatrick Nuclear Pouier Plant 
Inform* that TRADOC Pamphlet 350-30, " Interservice Procedures 
for Instructional Bys Development" referenced in NUREQ-O219 
li avail ibis In microfiche form from NRC. 
EEBAWiW. J. Division of Document Control. 79/O1/O9. 2pp. 

7903120203 DOCKET 30-333 James A. FitiPatrick Nuclear Pnwer Plant 
Transmits schedule* i< scope of Phase 2 uiork far questions 
PF-8,-11,-19, -2Q.-22. -23,-27i -32 d -36 re Fire protection 
program. 
EARLY, P. J- Pouer Authority Stab* of Neiu York, 79/O2/OS. 6pp. 



7902OSQOS9 DOCKET 90-333 James A. FittPatricl Nuclear Pouter Plant 
Responds to hlUC 790103 Itr TB Violation noted in IE Insp 
Rept 50-333/7B-24. Corrective ac t i ana: c 1 e-an up CTBUJ 
instructed not to remove signs !. Tapes in doc ontmni nat i on 
area. 
LEONARD, J. D. J>oujer Authority State of Neui York. 79/01/09. 2pp. 

7903050093 DOCKET 90-333 James A. FitiPatrick Nuclear Power Plant 
Foruards IE Imp Rept 50-333/70-24 on 731113-17 !. notice Of 
viola tion. 

BRUNNER, E. J. Region 1, Ph i lad e 1 ph i a. Reactor Operations Nuclcjii 

Support Branch. 78/12/Q7. 2pp. 

7902050093 DOCKET 50-333 James A. FitcPatvick Nuclear Power Plant 
Notice of violation from insp on 701113-17. 
Region 1. Ph i 1 adelpMa. Office of the Director 7a/l3/Q&. 



7903210197 DOCKET 30-333 Jamas A. FttiPatrick Nuclear Pouier Plant 
Forucrdi Revision 3 to facllitg securitg plan.Encl withheld 
(ref 10CFR3. 790K 
BEHRY, 0. T. Pouier Authority State of Neui YorV. 79/O2/14. lp. 



7902030097 DOCKET 5O-333 Jamen A. FitiP-atrick Nuclear Power Plant 
IE Inop Rapt 30-333/78-34 on 701 1 1 3-17. None amp 1 iance notad- 
fallure to control access to contaminated area. 

STETKA.T.F., KALMAN.Q.. MCCAB.E.E.C. Region 1, Ph 1 1 ad alp h i a, 

Reactor Operations Nue 1 oar Eupport Branch. 7B/12/Q6. 13pp. 



79OSa7O2Bl DOCKET 90-333 James A. FltiPatrick Nuclear Power Plant 
Requests deletion of Item 2 of implementation schedule 
submitted on 790214. Item was erroneously- submitted. 
MALTESE.M.J. Pouiar Authority State of New York. 79X02/20. lp. 

7902260343 DOCKET 30-333 James A. FltiPatrlck Nuclear Power Plant 
Forward! licintBit response* re DWJi purging & venting. 
BRUMNERiE. J. Region 1, Phi ladelphiai Reactor Operations Nuclear 

Support Branch. 76/O9/12. 3pp. 

79OS14021B DOCKET 30-333 James A. FltiPatfick Nuclear Pousr Plant 
Forwards bindnra d sots of divider tabs for use ui/NEDO-aiBBE) 
"Mark 1 Containment Program Load Definition Rept. " 
SOBONjL. J. Oaneral Electric Co. .Nuclear Energy Products Div. 
79/01/OB. Bpp. 

7"?OB28O3aS DOCKET flO-333 James A. FltiPatrlck Nuclear Pouior Plant 
As follouup to NRC 781119 request for gubmlttal of OfFsite 
Doie Calculation Manual for approval, forwards guirfelinen for 
goneral contents of manu-el. 

ORIMES.B.K. Astistant Director for- Engineers ti Projects. 

79/01/18. Dpp. 



7903270309 DOCKET 50-333 James A. FitiPatrick Nuclear Power Plant 
In response to 7311EO ItTiitera* A (. E o f TE Insp Kept 
90-333/7G-17 will be considered licensee idutittfiod items. 
SMITH. O, H. Region 1, Ph i ladalph la, Fuel Facility t. Materials 

BaPety Branch . 79/01/39. 2pp. 

7902270217 DOCKET 9O-333 Jamca A. FitrPatrlcl Nuclear Power Plant 
Detailed explanation of i! iKagreom&nt with Insp Rept 
30-333/73-17 atating that Items A, E t. F should not be 
Included In notice of violation App A. 
LEONARD, J. D. Pouier Authority State of Ney VorV. 70/11/20. 7pp. 

7903B7O226 DOCHET SO-3CI3 Jamca A, FitiPatrlck Nuclear Power Plant 
ForuinrcU IE Iivap R&pt 5Q-333/7B-17 on 7BO911-15 Z. notice of 
vi ol atlon. 

OHITH, G.H. f)o a I on 1, Plilladel[i.hia. PUB! Facility E. Materials 

Safety Branch. 7Q/10/30. 2pp. 

7902270229 tiaCKET 3B-333 James A. FltiPatrick Nuclnar Pouier Plant 
Notice of violation from insp on 7DO911-15. 

* Hegljon 1, Philadelphia. Fuel Facility t< Hnturiala Safety 

Drnncli. 7.Q/10/36. Clpp. 



79O32S0257 DOCKET 80-333 James A. FitiPatrlck Nuclear Pouier Plant 
Reiponda to 790111 request for review of paper "Vont 
Clearing During Simulated LOCA in a Mark I BUD 
Pressure-Suppression Sgs. " Recommends papsr be accepted for 
publication. 
OHIME9,C. Plant Systems Branch. 79/01/31. 2pp. 

79020Q019S DOCKET 30-333 James A. FitiPatrlck Nuclear Pniuer Plant 
Submits Dec 197B pranTfl" activity review, comprised of info 
from selected sections of monthly rep t. ui/sectlon on contract 
& billing status rifliaved. Lists meetings held & provides 
ta sk-bu-tasfc activity summary. 

BQuON.L. J. Oenaritl Electric Co. .Nuclear Energy Products Div, 
79/02/03. 10pp. 



7TO337023H DOCKET 30-333 Jamoa A, FitiPatrick Nuclear Pouier Plant 
IE ItiBp Rqpt &0-333/7H-17 on 7B091i-lS None ompHoncos noted: 
plant radiological protection proc odures, ol arm points d 
d 1 BcdarBo .control s, fai 1 ure to calibr gamma rod monitor. 
Failure td record diHCtinr[je temp. ETE} discharge Unit eicess. 
SHrtNBAKY.M. H. . STHHfl, J. P . Region li Ph 1 1 a tie 1 ph ia. Fuel 

Facility !. HoturiflU Bafqty Drnnch. 7a/lO/3ft, llpn. 

79O2B600B4 DOCKET 30-333 James A. Fitif'atrick Nuclear Pouior Plant 
Flesponds to IE Bulletin 7H-14. "Deter i orat 1 on of 1 Duna-N 
Components In ABCO Solanolds. " flfij or packaging datB of 
component! In USB thought to be t967.PBric.aic replacement 
schedule should be available in Mar 1979. 
LEONARD. J. D. Power Authority State oP New York. 7'?/OI/2A. Spp. 



790H090280 DOCKET BO-333 James A. FitiPatrlck Nuclear Pouier Plant 
Forwards application for amBnd to license re proposed Tech 
Spec changes. revising requirements for radiation dose rate 
monitoring device in high radiation area. Class III filing 
fee op 44.000 foruiarded under protest. 
EARLY.P.J. Pouer Authority State of Neui York. 79/03/07. lp. 



7902130007 DOCKET SO-333 James A. Fl tiPatric k Nuclear Pouer PUnt 
Foruiards IE Info Notice 79-01 , "Uerg en-Pater ion Hydraulic 
Sliacli t< SUIBIJ Arrottora (KSBA)." 

GRIEd.n.H, Jieglon 1, Plii ]*dolphl a, Office of the Diroctor. 

79/02/03. 2pp. 



7902090233 DOCKET SO-333 Jame^s A. FitiPatrick Nuclear Power Plant 
Application for amand to License DPR-59. U/encl proposed 
changes to Tech Specs re requirements For radiation dose 
rate monitoring device in high radiation area % supporting 
info. 
EARLY.P.J. Pouer Authority State of Neu> YorV. 79/02/07. dpp. 



79022B0474 DOCKET 50-333 James A FitiPatrlc-fc Nuclear Power Plant 
Foruiarda IE Bullotin 79-01, "Environ Qualification of Class 
IE Equipment. " Vf/list of 11 systematic evaluation program 
plants Par luhith no action IB requirnd. 

CRIER, D.H. Region 1, Philadelphia, Office of the Olroctor. 

79/OH/OS, 2pp. 



79OHU0273 DOCKET BO-333 Jamo A. FitiPatrick Nuclear Pouer Plant 
Aek roceipt of 7B1113 Itv reciuestino that util submit 
license amend application to incorporate requirements oF 
1OCFRSO App I into Tech SpECl within 90 day s. Requires addl 
timtiuill respond by 790416. 
EAULY.P.J. POUBT Authorltu State of Neu York. 79/OH/oa, lp. 

7902010271 DOCKET 50-333 James A. FitiPatrick Nuclear Pouier Plant 
Forwards IE Circular 79-02, "Failure of 120 Volt Vital AC 
Potiier SuppllBs. " 

GRIER.D.R Reglnn 1. Philadelphia. Office of the Director. 

79/01/14. Bpp. 



79O313O096 DOCKET 90-333 James A, FitiPatricV Nuclear Pnuer Plant 
Forwards monthly operating ropt For Jan 1979. 
LEONARD. J. D. Pouier Authority State of NOLI York 77/03/09. lp. 

7902130098 DOCKET 50-333 James A. FltiPatrlck Nuclear Ptjuicr Plant 
Monthly operating rept For Jan 1979. 
ZUFELT, E. Power Authority State oF NBUI York. 79/01/31. 7pp. 

79OHO60S24 DOCKET 30-333 Jamos A. FitiPatrick Mucloar Pnuer Plant 
Forwards LER 79-001/03I.-0. 
LEONARD. J.D. Power Authority State of tieui York. 79/01/31 lp. 



flO 



DOCKETED ITEMS 



790206022B DOCKET 50-333 James A. Fit. Patrick Nuclear Power Plant 
LER 79-001/03L-0 on 790105: fai lure to perform core 
performance survn i 1 lance or. 7B1210 !c 781333. Currently 
d.velopiro turVBillancB test checkoff list, to ensure that 
test ii not overlooked again. 
CHILD3,w V. Pouier Authority State of Neu York 79/01/31. 2pp. 

7902060316 DOCKET 50-333 James A. FitiPatrick NuclBar Powar Plant 
Forwards LER 79-002/03L-0. 
LEONARD, J. D Power Authority State of New York. 79/01/31 lp. 

7902060321 DOCKET 50-333 James A. FitiPatrick Nuclear Pouer Plant 
LER 79-002/03L-0 on 790lOB:flou biased portion of average 
power range monitor "D" inoperali 1 e. Caused ny operational 
amplifier fai lure. Circui t board replaced 
CHlLOSiU, V. Power Authority State of Nui York 



79O31301I3 DOCKET 50-333 Jami 
Forwards LER 79-003/03L-0. 
LEONARD, J. D Power Authority State of Neu V 



79/01/31. 2pp. 
FitiPatrick Nuclear Power Plant 



79/02/O9. lp. 



7902130116 DOCKET 50-333 James A. FitiPatrick Nuclear Power Plant 
LGfl 79-003/03L-0 nn 7901 1 5: during malnsteam flou. 
surveillance procedure instrument 03-DPIS-114B found set at 
110 psid.2 psid above Tech Spec mai due to drift in 
differential pressure switch. 
GUILDS, H V. Power Authority State of Neu York. 79/02/09. 2pp. 

7902220013 DOCKET SO-333 James A. FitiPatrick Nuclear Pouer Plant 
Forwards LER 79-004/03L-D. 
LEONARD, J. D. Pouer Authority State of New York. 79/03/13. lp 

7902S20015 DOCKET 50-333 James A. Fi t ,P* trlci Nuclear Pouor Plant 
LEH 79-004 /03U-0 on 7901 19: uh i le performing Operations 
Surveillance Test F-St-76D, water lead noted on post 
indicator valve 76-FPS-30 t, discovered water leaking from 
lubrication line. Caused oy shovel cut during snoia removal 
CH1LDS,U.V. Power Authority State of Neu York. 79/03/13. 2pp. 

7902220031 DOCKET 50-333 James A Fit, Patrick Nuelear Power Plant 
Forward! LER 79-005/04L-0 
LEONARD, J D. Power Authority State of Neu York. 79/02/14. lp. 

7902220034 DOCKET 50-333 James A. FitiPatrick Nuclear Power Plant 
LER 79-005/04L-0 on 790124. apparent e,c e s s ive solution 
rlease frqm makeup water treatment waste neutrallier tanks 
to circulating uater discharge tunnel noted Calculations 
shou Tech Specs nut eiceederf. 
GUILDS. H. V. Power Authority State of Nw York. 79/03/14. 3pp. 

79032300B5 SOCKET 50-333 James A. Fit. Patrick Nuclear Pouer Plant 
Forwards LER 79-006/03L-0. 
LEONARD, J. D. Pouier Authority State of New York. 79/03/16. lp. 

7903330083 DOCKET 50-333 JamBS A. F.tzPatrick Nuclear Power Plant 
LER 79~OOi/03L-0 on 790124. ground fault on 125 volts DC 
station battery A noted Caused by bellows failure (pressure 
switch circuit) on safety relief valve. 
CHILDS.W.V. Power Authority State of New York. 79/03/li. 4pp. 

7903330136 DOCKET 50-333 James A Fit, Patrick Nuclear Pouer Plant 
Foruards LER 79-007/03L-0. 
LEDNARD.J.D. Pouer Authority State of Neu York. 79/O2/16. lp. 



790206030B DOCKET 30-33-1 Deaver Valley PouiHr Station, Unit 1 
Forward! draft revisions to amended physical security plan. 
Plan ulthheld (ref 1OCFR3. 790). 
HARQUARDT, W. M. Duquasne Light Co. 79/02/O2. 2pp. 

7903360299 DOCKET SO-334 tieavtr Valley Poiuer Station, Unit 1 
Forwards modifitd amende^ securitg plan, Submi ttal upditeu 
plan submitted on 770523. Plan withheld Ira* 10CFRS, 79O). 
DUNN.C.N, Duquesne Light Co. 79/03/21, lp. 

7902360486 DOCKET 50-334 Beaver Valley Pouier Station, Unit 1 
In response to 7912O1 Itr, forwards suppl implementation 
schedule for Fira protection commitmBntfi re Bquipmant 
installation. 
DUNN. C. N. Duquesne Light Co. 79/03/31. 3pp. 

7903090262 DOCKET 30-334 Doaver Vfllleij POUBI- Station, Unit 1 
Forwards Endorsement 2 to ANI Binddr ED-SB Si MAELU Binder 
XD-58 which sets forth premium for 1979 re socondary 
financial protection. 
HARNETT, J. E. Conover 8, Associates, Inc. Insurance. 79/01/23. 

7903090265 DOCKET 50-334 Deaver Valley Pouer Station, Unit 1 
Forwards Endorsement 30 to ANI Policy NF-324, & Endorsement 
23 to MAELU Policy MF-H7, both for calendar year 1979. 
BARNETT, J. E. Conover !< Associates, Inc. Insurance. 79/01/23, 

7902BB0383 DOCKET 30-334 Deaver Valley Pouar Station, Unit 1 
As follouup to NHC 7B1II3 request for submittal of Offsite 
Dose Calculation Manual for approval , forwards guidelines for 
general contents of manual. 

ORIMES.B.K. Assistant Director for Engineer! . Projects 

79/01/1B. Spp. 

7902030066 DOCKET SO-334 DBaver Valley Pouer Station, Unit 1 
Agree, generally U/7BO717 util analysis of potential 
consequences of oil pipeline f ai lure. Analyst s is sufficient 
anly for Beaver Valley t. is conditional upon the pipeline 
location, configuration Si operation not changing. 
SCHWENCEf), A. Operating Reactors Branch 1. 79/01/19. 3pp. 

7902030070 DOCKET SO-334 Daaver Valley Pouer Station, Unit 1 
Safety evaluation supporting revaluation of patrolaum 
product pipeline across aite. 
* Office of Nuclear Reactor Regulation. 77/01/19. 7pp. 

7903140164 DOCKET 50-331 Beaver Valley Power Station, Unit 1 
Bummarli.s 79O133 meeting held to discuss containment liner 
weld channels at facility. NRC requested util formally 
document info presented oral ly. Supporting documentation 
nc 1. 

WIOOINQTON, D. Operating Reactors Branch 1. 79/01/39. 23 pn . 



3pp. 



3pp. 



7902130195 DOCKET SO-334 Deaver Vall| 
Forwards addl info re proposed Tech 



Pouier Station, Unit 1 
Spec change to allowable 



.*.!...... * II l L J r--r ---- ..., s'l'Dl. b<ml1^v bu 

nuiw r S n reactor core radial p.aking factor 

DUNN.C.N. Duquesne Light Co. 79/02/OB. Spp. 

7902140131 DOCKET 50-334 Beaver Valley P au .n Station, Unit 1 
Re.ponds to NRC 7B1 120 Itr re containment !pur 9 lno during 
to r . 1 ni,,^ E Ih t J t "'- RBV !^ Hd I)BBi9n ot 93fet "tu-tlon signals 
oth!r ?, , H TT din9 " P ne alflnal d l' B ' not Inhibit 
niirn, ^ ,, 3 i ' Malntaina '"bat^sphe'ric conditions. 
DUNN.C.N. Ducjuesne Light Co. 79/02/08. 2pp. 



had not been conducted nn 

subsequently revised. 

CH1LDS, H. V. Pouer Authority State of New Yorl. 79/02/16. 



33-34 as required. Procedures 



LE4CNARD,J. D. Pouer Authority State of Neui York. 79/02/20. 



2pp. 



~ n ^r t A Fit ' P ^ick "> Pdu.r Plant 
LER 79-OQB/03L-0 on 790135 core performance surveillance 
not done on 79OI30-22. Operations surveillance test for daily 
checks was being develuped to include check-off of 
rull^'i"!!" "I" 1 ra ent- Caused by operator error. 
CHILDS.U.V. Power Authority State of (Jew York. 79/02/20. Spp. 



; 334 Deaver yalle Fo "* r Cation, Unit 1 
JfBPM th.t THADDC Pamphlet 350-30, " Interservice Procedures 
for instructional Sys Development" referenced in NUREG-0319 
la available in micrufiche form from NRC 
DESAH, U. J, Division of Document Control. 79/OI/O9. 2pp. 



nr ~ 33A eaVcr VallE Pouel - Bt.tion. Unit 1 

~ 2S? ^vxsions to amended physical security plan 

lEt B E IVI . M K C i' ment Revlaiona Deluded introduction, 

!nl l>jective s ,organiration restructuring emp loyee 

screening program ct.ange.W/ D end 

MARQUflBDT, W. M. Duquesne Light Co. 79/01/26. lp. 



7902220057 DOCKET 30-33fl Beaver Valley Pouer Station, Unit 1 
As result of 790123-36 meeting, cor, boring program is 

I;?U U?n b H a '", addl " U ""; tor M^e'Ltion 
n.i, illi * ? P prDBram for t-bllltg improvement If 
Kiw ? M" n ' com P lBte ctivities >y 790430. 
OUNN.C.N. Duquesne Light Co. 77/02/12. 2pp. 



Valle , P"- Bt.tion. Unit 1 
FallUrV f 13 Volt t.l AC 

dBl p- hil -' 0"l'" P the Director. 



7902130036 DOCKET 90-334 Beaver Valley Pouer! Station, Unit 1 
O^r^Swfy^X^rr.^SA !' H""""-"*""'' ^" 

RB! " 0n '' FhiladBl P hI 3, Offi'ce of the Director. 






lp . 



EaiDn '' 



.. Office of the Director. 



7902120061 DOCKET SO-334 Beaver Val 1 eu Vower- Station, Unit 1 

rZr^ mn ^" llj P" ati "3 pt for Jan 1979. 
DUNN.C.N. Duquesne Light Co. 79/OS/07. lp. 



DOCKETED ITEMS 



81 



790212006H DOCKET 5O-334 Beaver Valley Power Station. Unit 1 
Monthly operating rept For Jan 1977. 
WITKOWBKYr F. P. Duquesne Light Co. 79/03/05. 6pp. 



7902360451 DOCKET 5O-335 St. Lucia Plant, Unit 1 

Forwards Endorsement 30 to AMI Policy NF-237. Endorsement 
amends 1979. advance premium to reflect a refueling shutdo 
DUCK, J. R. Marsh !. McLennan, Inc. 79/02/19. 2pp. 



79020602B2 DOCKET 30-334 Beaver Valley Pouier Station, Unit 1 
Forwards LER 7B-Oi.fi/O3L-O. 
HERLINQ, J. A. Duquesne Light Co. 79/01/30. 2pp. 

7902060203 DOCKET 50-334 Beaver Valley Payer Station. Unit 1 
LER 7B-066/03L-0 on 781230: nei ther containment sump pump 
would operate, due to mlsadjusted impeller & bad bearings. "A" 
pump readjusted It "B" pump relaced. Pumps returned to normal 
svc. 
WERL1NO, J. A. Duquesne Light Co. 79/01/30. lp. 

7902090319 DOCKET SO-334 Heaver Valleg Power Station. Unit 1 
Forward* LER 79-OO2/O3L-Q & 79-003/03L-0. 
WERLINS.J.A. Duquesne Light Co. 79/02/02. 2pp. 

7902090324 DOCKET 30-334 Beaver Valley Power Station, Unit 1 
LER 79-002/O3L-0 on 79O1O3: raac tor trip & safety injection 
occurred. During recovery. 1C charging pump had low discharge 
pressure due to faulty rotating element in pump. 
WERLINO, J. A. Duquesne Light Co. 79/02/02. lp. 

7902090331 DOCKET 50-334 Beaver Valley Power Station, Unit 1 
LER 79-003/03L-0 on 79O102: Increasing containment air 
partial pressure observed. IB containment vacuum pump motor 
running, but pump not turning due to seized rotor on pump. 
HERLINO. J. A. Duquesne Light Co. 79/02/02. lp. 

7902210239 DOCKET 30-334 Heaver Valley Power Station, Unit 1 
Forward! LER 77-103/031-1. 
WERL1NQ.J.A. Duquesna Light Co. 79/02/13. 2pp. 

7902210261 DOCKET 30-334 Beaver Valley Power Station, Unit 1 
'LER 77-105/03L-1 on 77101 1 : during 18-month surveillance 
tetting, 13 hydraulic snubbers appeared to have suspect 
lockup h bleed rate valves. All snubbers have been rebuilt b 
tested to niui generic values. 
WERL1NQ, J. A. Duquesne Light Co. 79/O2/13. 2pp. 

7902260346 DOCKET 80-334 Beaver Valley Power Station, Unit 1 
Forward* LER 79-Q06/03L-0. 
HEflLINQ, J. A. Duquesne Light Co. 79/02/20. 2pp. 



7902060025 DOCKET 50-335 St Lucie Plant, Unit 1 

Forwards Amend 29 to License DPR-67. EiA fc notice of 

issuance/negative dec laration. 

REID.R. W. Operating Reactors Branch 4. 7<?/01/H4. 



3pp. 



7902060039 DOCKET 50-335 St. Lucie Plant, Unit 1 

Amend 29 to License DPR-67 changes App B administrative 
controls of Tech Specs to delete certain environ monitoring 
requirements t, authoriie a 2 F increase in temp of condenser 
cooling water. 
REID.R.H. Operating Reactors Branch 4. 79/O1/34. 39pp. 

7902060032 DOCKET 50-335 Bt. Lucie Plant, Unit 1 

E1A supporting Amend 29 to License DPR-67. Discusse & 
requested organi lational changes, data col lee tinn. monitor ing 
requirements k temp change limit for condenser tooling 
water. No E1B required. 
* Office of Nuclear Reactor Regulation, 79/01/24. 6op- 

790S060036 DOCKET 50-333 St. Lucie Plant. Unit 1 

Notice of issuance of Amend 39 to License DPR-67 !c negative 

declaration for EIS. 

REIDiR.W. Operating Reactors Branch 4. 79/O1/24. 2pp. 

7903QB0344 DOCKET SO-33S Bt. Lucie Plant, Unit 1 

Supports proposed eitension of Price-Andersen provisions re 
indemnification of spent nuclear fuel, regard 1 ess nf uhei-o 
fuel Is stored. 
UHHIQ.R.E. Florida Power t. Light Co. 79/01/29. lp. 



7902090336 DOCKET 30-33B St. Lucie Plant. Unit 1 

Suppl to 790103 Itr. Informs of intent to justify unlimited 
purging of containment during operati on. Eva luation to be 
completed 790BQ1. Number d duration o* purges will be 
minimiied.No interim limit on purging established. 
UHRIO.R.E, Florida Power !. Light Co. 79/02/O1. In 



7902120193 DOCKET 50-335 St. Lucie Plant, Unit 1 

Submits info re steam generator cleaning process solvent 
formulation. Info withheld <ref 10CFRB. 790). Affidavit end. 
UHR18,R,E. Florida Power & Light Cn. 79/02/05. 5pp. 



7902260349 DOCKET 30-334 ueaver Valley Power Station, Unit 1 
LER 79-006/Q3L-Q on 790120:vital but inverter 3 failed 
reiulting in loss of voltage on bus. Caused reactor to trip 
on false indication of 1C reactor coolant pump breaker 
opening. Failure caused by faulty components in inverter. 
MERLINS, J. A. Duquesne Light Co. 79/03/20. lp. 

7902220119 DOCKET 50-339 Bt. Lucie Plant, Unit 1 

Informs that TRADOC Pamphlet 350-30. "Interservice Procedures 
for Inttructlonal Syo Development" referenced in NUREO-0219 
tl available in microfiche form from NRC. 
BESAM. W. J. Division of Document Control. 79/01/09. Spp. 

7902010132 DOCKET 50-333 St. LuciB Plant, Unit 1 

Requeits 60-day eitension to respond to NRC 781229 Itr. Ltr 

requested comments tt implementation schedule for staff 

position! generated as result of 7B120B fire protection site 

visit. 

UHRIQ.R.E. Florida Power fc Light Co. 79/01/26. lp. 



7902260313 DOCKET 30-338 St. Lucie Plant, Unit 1 

Forwards change* to Revision to security plan dated 
7B101B in response to NRC 790126 Itr. End withheld 
(rnf 10CFR2. 790). 
UHRIO.R.E, Florida Power b Light Co. 79/02/20. lp. 



7902060252 DOCKET 50-335 Bt. Lucie Plant, Unit 1 

Foruards Endorsement 2 to Policies XB-2Si XB-26 & XB-S9. 
FIELDER, J. Marsh b McLennan, Inc. 79/02/02. 3pp. 



7902120173 DOCKET 30-335 St. Lucie Plant. Unit 1 
Foruards Endorsement 29 to NELIA Pollcu NF-227. 
FIELDER, J. Marsh fc McLennan, Inc. 79/02/Oi. 2pp. 



7902210174 DOCKET 30-335 St. LuciB Plant, Unit 1 

Forwards remittance of i3, 634.63 indemnity fee for Licent 

DPR-67 for period 79021 1-B00210. 

UHRIQ,R.E. Florida Power & Light Co. 79/02/12. 2pp. 



7902230162 DOCKET 30-333 St. Uucle Plant, Unit 1 

Forwards Endorsement 23 to MAELU Policy MF-BB. Amends 

Condition 4 to reflect new pool capacity. 

DUCK.J. R. Harsh b McLennan, Inc. 79/02/16. 2pp. 



7902200029 DOCKET 30-335 Bt, Lucie Plant, Unit 1 

Responds to 790123 Itr & forwards IB, BOO payment for " 

h OB amend requests. 

UHRIO.R.E. Florida Power & Light Co. 79/02/07. 2pp. 



79021503B3 DOCKET 30-335 Bt. Lucie Plant- Unit 1 

Forwards request to amend App A of License DPR-67, In 
response to Condition of End 1 to license. Util & St Luc IE 
Facility Review Qroup have found no unresolved safety issues 
in encl safety evaluation. W/o amend request. 
UHRIO.R.E. Florida Power !> Light Co, 79/02/09. 4pp. 



7902270303 DOCKET 30-335 St, Lucie Planb, Unit 1 

Requests amend to App A of License DPR-67 re engineered 
safety features response time on containment isolation 
function. Proposed amend tt safety evaluation encl. 
UHR10, R.E. Florida Pnwer t. Light Co. 79/03/21. 5pp. 



79022B0106 DOCKET 30-333 St. Lucie Plant, Unit 1 

Forwards IE Info Notice 79-01, "Borgen-Pater&on Hydraulic 
Shock & Sway Arresters (HBSA)." 

O'REILLY, J. P. Region 3, Atlanta, Office of the Director. 

79/02/02. 5pp. 

7902120221 DOCKET 30-335 Bt. Lucie Plant, Unit 1 

Forwards IE Bulletin 79-O1, "Environ Qualification of Class 
IE Equipment. " 

O'REILLY, J. P. Region 2, Atlanta, DPfice of the Director. 

79/02/03. 2pp. ' 

7902210156 DOCKET 50-335 St. LuciO Plant, Unit 1 

Forwards IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment." U/list of 11 systematic evaluation program 
plants for which no action is required. 

O'REILLY, J. P. Region 2, Atlanta, Office of the Director 

79/03/OH. 2pp. 



7902280103 DOCKET 30-335 St, Lucie Plant, Unit 1 

Forwards IE Info Notice 79-03, "Lira! torque Valve Qeared 
Limit Suited Lubricant. " 

O'REILLY, J. P. Region 2, Atlanta. Office of the Director. 

79/02/09. 2PP. 



7902010164 DOCKET 50-335 St. Lucie Plant. Unit 1 
Forwards RO 335-D-7S-09 on 7B1227. 
UHRIS. R.E. Florida Power !. Light Co. 79/01/18, 



92 



DOCKETED ITEMS 



79O2Q10169 DOCKET 30-335 5t. 
RQ 33S-B-7B-09 on 731327 c 
34 F. Cause described in pr 
Awaiting licensing action 



limit to he ititreas 
Florida 



i to 26 S 

ight Co 



.ucie Plant, Unit 1 

idenser temp rise in excess of 

Mnus RD-335-7B-03. Q.1,07 & 09. 

i request to allow condenser temp 



79/01/IB 



2pp. 



7902Q1015B DOCKET 50-335 St. Lucie Plant, Unit 1 
Forwards HD 335-D-79-Q1 on 790105. 
UHfHG.H.E Florida Power t. Light Co. 79/01/19 



79O2QI0163 DOCKET 50-335 St. Luc 1 e Plant. Unit 1 

Rd 335-D-79-01 on 790105: thermograph uas displaced from 
monitoring Location. Buou support broke during storm. Buoy was 
replaced & thermographs were installed. 
" Carolina P'auer (, Light Co. 79/01/19. 2pp. 

79D2O700S7 DOCKET 5O-336 Millstone Nuclear Power Station, Unit 2 
Forwards NBC position re deficiency in modified amended 
security plans to provide opportunity for util to 
incnrporate suggested add i lion. Reviews appeal process. 
Details withheld tref 1QCFR3. 790) 
Z1EMANN, B.L. Operating Reactors Branch 2. 79/01/25. Ip. 

79O22BQ455 DOCKET 30-336 Millstone Nuclear Pouer Station, Unit 2 
Requests afldl info re financing of refueling outage bldg 
const. H/enc 1 questionnaire 
ZIEMANN.D.L. Operating Reactors Branch 2. 79/01/23. 4pp. 

7902130092 DUCKET 50-336 Millstone Nuclear Power Station, Unit 5 
Forwards Endorsement 52 for Policy KF-52, effective 790101. 
SEGER.R.M. Northeast Utilities 79/O2/06. 3pp. 



7902360284 DOCKET 50-336 Millstone Nucloar Power Stobion. Unit 2 
Pruposes amend to License DRR-63. Proposed changes include 
core performance characteristics t, safely analyses re 
operation at 2,700 MHt. 
COUNSIL.W.Q. Northeast Utilities. 79/02/12. 400pp. 

7902210234 DOCKET 50-336 Millstone Nuclear Pouer Station, Unit 3- 
Informs that requested submlttal date of 790213 for 
radiological effluent Tech Specs cannot be achieved due to 
several specified reason*. Tech Specs will be ready 790309 
for Unit 1 li 79O323 for Unit 2. 
COUNSIL,U. 0. Northeast Utilitias, 79/02/13, 2pp. 

7902140367 DOCKET 50-336 Millstone Nuclear Power Station, Unit 2 
Forwards IE Inap Repts SO-245/7S-37 (. 50-336/78-34 on 
7B1204-OB. No noncomnl ianc e noted. 

CARLSDN.R.T. Region 1, Philadelphia, Reactor Construction t. 

Engineering Support Branch. 70/12/3B. Bpp. 

790214037B DOCKET 50-336 Millstone Nuclear Power Station, Unit 2 
IE Insp Repts 50-243/7B-37 t, 50-336/7B-31 on 7S1204-OB, No 
noncumpl lance noted. Major areas Insp: spent fuel rack mod 
including procurement, receipt, inatallatl on. testing & 
procedural controls. 

FA8ANQ,ft.N., FEIL.R. A. . EDNETER,9.D. Region 1. Philadelphia, 

Reactor Construction fc Engineering Support Branch. 70/12/23. 9pp. 

7902010370 DOCKET 50-336 Millstone Nuclear Power Station, Unit 2 
Forwards IE Circular 79-02, "Fai lure of 120 Volt Vital AC 
Powar Supplies, " 

GRIER.B.M. Region 1. Philadelphia, Office of the Director. 

79/01/16. Bpp. 



7902130167 DOCKET 5O-336 Millstone Nuclear Power Station, Unit 2 
Forwards certified copies of Endorsement 57 to Policy NF-173 
re premium !i amend of Condition 4 for 1979. 
SEGEfl.R.M. Northeast Utilities. 77/O2/06. 3pp. 

79022D0067 DOCKET 50-336 Millstone Nuclear Power Station, Unit 2 
Forwards Endorsement 2 to NELIA Binder EB-15. EB-16, XB-1 5 & 
KB-16 for calendar year 1979, eitending binder protection 
through 1979. 
5EGER,R. M. Northeast Utilities. 79/02/09. 9pp. 

79D22I0031 DOCKET 5O-336 Millstone Nuclear Power Station, Unit 2 
l~ists project reviews for net five ACRS full committee 
meetings. 
CROCKER L. P. Division of Project Management. 79/03/05. 3pp. 

7903360343 DOCKET 50-336 Millstone Nuclear Power Station, Unit 3 
Forwards licensees responses re BUB purging I, venting. 
DRUNNER.E. J. Region 1, Philadelphia, Reactor Operations Nuclear 

Support Branch. 76/O5/I2. 3pp. 

7903130209 DOCKET SO-336 Millstone Nuclear Power Slatinn, Unit 2 
Responds to 780419 1 tr. Forwards evaluation program including 
planned insps of control element assembly guide tubes in 
order to assess performances of sleeved guide tubes 
COUNS1L. U. G. Worth east Utilities. 79/01/24. 3pp. 

7903120189 DOCKET 50-336 Millstone Nuclear Power Station, Unit 2 
Forwards proposed revisions to Environ Tech Specs submitted 
7B0303 J.7B1030. Requests portions not affected by proposed 



logica 1 
CDUNSIL.H. 0, 



Northeast Utilities 79/O3/02. 



iPP. 



ly. 



7902M0215 DOCKET SO-336 Millstone Nuclear Power Station, Unit 2 
Desponds to NHC verbal request for ad<ll info on proposed 
mod: to Tech Specs re ECC3 performance calculations for 
charging pump f lou. No plant mod is necessary & there is no 
change in valve motion or operability requirements 
COUNSIL.W. G Northeast Utilities. 79/02/06 2pp. 

7905150355 DOCKET 50-336 Millstone Nuclear Power Station. Unit 2 
rtck receipt of 791222 HP re NRC position on fee 
requirements For amends to application proposing changes to 
ETS !. Saffta Tech Specs. Action has been deferred by Nf?C so 
previous fee payment is inappropriate. 
COUNS1L. W. G. Northeast Utilities 79/02/O6 



Ip. 



Unit 2 



79021503S6 DOCKET 50-336 Millstone Nuclear Power Station 
Act receipt of 730303 I tr re prnposed minor changes to 
ETS. fiction to be deferred on request because implementation 
of App 1 Teth Specs mill cover items proposed. 
Z1EMWN.D. L Operating fleactors Branch 2. 7S/12/O5. Ip 

7902150359 DOCKET 50-336 Millstone Nuclear Power Station, Unit 2 
Forwards App 1 model Tech Specs intended to provide guidance 
re equipment & administrative requirements specs. Requests 
submittal of license amend application reflecting applicable 
specs. N/o end. 

GR1MES.U.K Assistant Director for Engineers & Projects. 

75/07 /1 1 L p 



7902080064 DOCKET SO-336 Millstone Nuclear Power Station, Unit 2 
Ack receipt of 7BI232 Itr informino NRC of stepi taken to 
correct violations noted in IE Insp Rept* 30-343/78-39 (. 
50-336/7B-21. 

DRUNNER.E. J. Region 1, Philadelphia, Reactor Operations Nucl*r 

Support Branch. 79/01/24. Ip. 

7903080067 DOCKET 50-336 Millstone Nuclear Power Station, Unit 3 
Respgnds to NRC 781033 Itr re violations notnd in IE Insp 
Repts 90-24S/7B-39 d 50-336/78-34, Corrective actions: std 
precaution entered in all ays procedures when equipment 
responds to an accident signal, 

CGUNBIL,W, Q, Northeast Nuclear Energy Co. (Northeast Utilities), 
7B/12/32. 2pp. 

79020602B4 DOCKET 50-336 Millstone Nuclear Power Station. Unit 3 

Forwards page ace idanta 1 lu omitted from recent eubmittal on 
inservlce inap program. 

COUNSIL, W. 0. Northeast Utilities. 79/01/31. 2pp. 

7902130022 DOCKET 50-336 Millstone Nuclear Power Station, Unit 2 
Forwards IE Info Nuticn 79-01 , "Bergen-Patorson Hodraullc 
Shock t. Siuay Arrestors (HSSA)," 

DRIER, B.H. Region 1, Philadelphia, Office of the Director. 

79/03/02. 2pp. 

7903280477 DOCKET 30-336 Millstone Nuclear Power Station. Unit 2 
Forwards IE Bulletin 79-O1, "Environ Qualification of Class 
IE Equipment." W/list of 11 systematic evaluation prpnram 
plants for which no action is required. 

OR1ER. B. H. Region 1. Philadelphia, Office of the Director. 

79/02/OB. 2p p . 

79022200B6 DOCKET 50-336 Millstone Nuclear Power Station, Unit 2 
Forwards monthly operatino rept for Jan 1979 
OPEKA, J, F. Northeast Utilities. 79/02/13. Ip. 

7902330067 BOCKET 3O-336 Millstone Nucloar Power Station. Unit 3 
Monthly operating rept for Jan 1979.W/encl refueling info 
request, 
HOHLETT, G. H. Nnrtheabt Utilities. 79/02/05. llpp. 

7902330H? DOCKET 50-336 Millstone Nuclear PoiUBr Station, Unit 2 
Monthly operating rept for Jan 1979 
HDWLETT.G.H, Northeast Uti H ties. 79/02/03. 5pp. 

7902360201 DOCKET 50-336 Millstone Nuclear Power Station. Unit 2 
Forwards LER 7B-016/1P. 

FERLftND,E. J. Northeast Nuclear Energy Co. (Northeast Utilities). 
7B/07/26. 2pp. 

7902050195 DOCKET 50-336 Millstone Nuclear Power Station, Unit 3 
Forwards LER 7B-034/O3L-0, 
OPEKA, J, F. Northeast Utilities. 79/OI/36. Ip. 

7903050199 DOCKET 50-336 Millstone Nuclear Power Station, Unit H 
LER 7B-034/03L-0 on 761227: durl ng -surve i 1 lance, svc water 
isolation valve 2-SW-3. 2A failed to close. Caused by 
actuating air flow being iilocled. 
MCCANN,W. J. Northeast Utilities. 79/01/25. Ip 



DOCKETED ITEMS 



DOCKET 50-336 Millstone Nuclear- Power Station, Unit S 
rdl UEB 79-Q01/03L-0. 
ft.J.F. Northeast Utilities. 77/02/03. lp. 

.0AO394) DOCKET 90-336 Millstone Nuclear Power Station. Unit 3 
[a 79-001/031.-0 on 7'JOIQS; during normal op erat i an. tail ure 
Inverter 4 interrupted 120V vital AC pouer *o Channel D 
Miponent*. Inverter malfunction caused by failure of several 
paelton (CD b nacillator board (SC1-PU-1 163) . 
TESj R. W. Northeast UllUtiSB. 79/02/O2. lp. 

.Q13B DOCKET SO-336 Millstone Nuclear Power Station, Unit 3 
,rds LER 79-Q02/03L-0. 
A.iJ.F- Northeast Utilities 79/03/1)3. lp. 



7903OBOai7 DOCKET 50-338 North Anna Power Station., Unit 1 
Endorsements 3 to Hinders EB-27 ! EB-2a. id/changes in 
liability '"r VA Elettric !i Potire-r Co. 

QERAS, T. Nuclear Energy Liability Insurance Assot i ation. 11 
lp. 

7902200025 DOCKET 30-339 North Anna Power Station., Unit 3 
Endorsement far calendar ij ear 1979 for NFLIA Policy NF-lfffc. 
Virginia Elettric fc Power Cg. 7"7/Ol/20. lp. 

790224.0461 DOCKET 30-339 North Anna Power Station, Unit 1 
Endorsement 33 to NELIA Policy MF-240 for calendar gear 
1979. 
Nuclear Energy Liability Insurance Association. 79/01/2O. 



,130130 DOCKET 30-336) Millstone Nucloar Pouar Station, Unit 2 
; fl 7^00a/O3L-O on 79O116: following return to tuft-critical 
lno~itior.t. investigation* showed faulty position indication 
,i- control element assembly 63, Indicating about 6 atept 
gh.Cauwd bg petition indication unit drift 
;T.EB.R.W, Northeast Utllitias. 79/OS/OB. lp. 

.O1D2 DOCKET 30-336 North Anno Power- Station. Unit 1 
,f in opposition .to intervention of Citiiens Energy Forum 
r tomc Alliance re proposed spent fuel storage pool 
tnsion- Urges haste in denying intervention. W/Cert if Icate 

!NJM.W.r CHUIBTMAN, J- N. , RINACA.J.M. Hunton i< Williams. 
jl/17. 34pp. 



79020801130 DOCKET 50-338 North Anna Power Station. UJH 
Forwards Endorsentnt 19 to MAEt-U Policy P1F-9ib. 
KELLEY.P.L. Jnhnaon Ii Higglns InsurancE. 79/01/31. 



3pp 



7902070083 DOCKET 50-339 North Anna Potuer Station. Unit 1 
Confirms 790123 phone conversation, fleque&ta security badge 
for AH Johnson to allow him access to protected area. 
KEMNA.VJ.B. Region 2, Atlanta, Safeguard* Branch. 79/01/24. 

79020902?! DOCKET 30-33B North Anna Pomur Station. Unit 1 
Forwards safety evaluation relating to 7G0501 request Far 
author! lat ion to increa-ae storage capacity of spent fuel 
storage pool, W/o encl. 
PARRjO. D. Light Hater Reactors Branch 3. 79/O1/31. lp. 



2O149 DOCKET SO-33B North Anna Pouar Btationj Unit 1 

T-Rcvlpt of Coalition 79OJ14 1 tr which ft4 bflen foruarfled 
-unil for both partiea. 
N.J. North Anna Environmrntal Coalition. 79/01/17. lp. 

3O230 DOCKET 00-33B North Anrfl Pouier Bt*tton. Unit 1 
p-Dnie bv'ufell to HRC 79O109 avBluotlon t puirphouse 
*lmnt, A*k for mm* llouablo xvvragB vc' water 
tlnnant of ,33 f"Bt " revision of Tch Spec 4.7,13.1. 
tlfleats of Svc end. 
JBTHAN.J.M, Hunton * HilllamB. 79/01/19. 5pp. 



790227O21B DDCWET SO-33B North Anna Power Stationp Unit 1 
Foruardt lubstitute page- for tie at Load comparison table 
originally submUtfld 760301. Corrects typographical error. 
8TAL1.IN08. C. M. Virginia Electric k Power Co. 79/02/23. 2pp. 

79030SO13S DOCKET 30-33B North Anna Power Station, Unit 1 
Forwards IE Insp Rapt 5-0-338/711-44 on 7B12O6-CB. Mo 
noncomp lianc* noted. 

O'REILLY, J. P. Region 2. Atlanta, Office of the Director. 

70/12/27. Sflp. 



90124 DOCKET 30-33B North AnnB'Pouier Station, (fnit 1 

uird flAND77-19H7 "Traniport of Hadlonuclidea in Urban 

iTon:Horkin|| Drafi ABe*B(nent, " W/o ancl, 

OBEHOi S. C. Dffite of the Eioctitlvo Laflal Director. 79/O1/23. 



BO071 DQCHET 30-338 North Anna Power Btation. Unit 1 
TBBB 781219 denial of Inter ven fclon, finding sufficient 
0)1** t In the proceeding in pati tlOTicr* ' geographical 
Mimltn to b recTeatlonal actlvitij in th vicinity of 
1 Ittg, 
UO, M. E. Atomic Safety and Heeniing Appeal Panel. T)i 



7902030113 DOCKET 3O-333 Nortli Anna Pouep Station. Unit I 
IE Imp Kept 50-336/78-41 on 761206-03. No none ompl iancE 
notfd. Major area* inspected: data collected on settl Bmant* of 
svc water pump house b licensee action re settlement 
surveys. 

LENAHAN, J, J. , BRYANT. J, C. flegion 2. Atlanta. Reactor Cans trucUon 

& EnBlnfl&ring Support Branch, 76/12/37. 9pp. 

7902240117 DOCKET 30-330 North Anna POLJBT Station, Unit 1 
Forward! IE Insp FlepU 30-330/76-^0 (. 5O-339/73-35 on 
7B1 10&-120B. Ho noncompt lance noted. 

LDHQ.F.J, Region 3, Atlanta. Reactor Oper-atlon-i Nuclear Support 

Branch. 7B/13/27. Syy, 



DOCKET 30-33B North Anna Power Station. Unit 1 
ha* raviewad util response to NRC evaluation of 
,phousa *ettlemont. Agrees that proposed Tech Spec 4.7.13.1 
Inappropriate! would roqulre retroactive monitoring of 
und water flow rates, W/encl change. 
,NBONi D. T. Office of the Executive Leaal Director. 79/01/29. 



7902B60I22 DOCKET BO-338 North Anna Power Btatlon. Unit I 
IE ln*p Repts SO-33B/76-10 & 5D-339/76-3S on 7Q1 106-120Q. No 
noncompliance noted. Major areas lnpnc ted: LERs. *pent fual 
pit embedments, settlement of Class 1 structures- 
praojiBratlonal testing t. tys coraparlion to FSAR drayinga. 
KIDDi M. S, j LEH1B.R.C. Reoion 2. Atlanta. Reactor -Operations 

WueUar Support Branch. 78/12/aB. llpp. 



DOCKET SO-33B North Ann* Power Station. Unit 1 
.wait* ABLAB not to ineraasi allowable settlement, to hold 
irlnfl> fc to tnveitigata llcftnie revocation becauBe util 
:tth*ld haiardous info. 
tMPBONiF. C, Affiliation Unknown. 79/OI/31. 3pp. 



790S3B012S DOCKET 90-33B North Anna Power Station, Unit 1 
Forwards IE Insp Rept SO-33B/7B-43 on 7B121S-15. No 
noncompllance noted. 

BUTHEBLAND. J. T. Region 2. Atlanta. Fuel Facility & Materials 

Bufety Branch. 79/01/03, Zap. 



&2S704B2 DOCKET 30-338 North Anna Power Station, Unit 1 
fruit NflC not to tncreaie allouable s*ttl<mBfit. to hold 
ie>aring>k to lnvaatloat posiibls license rBvacatlon bacau 
til withheld harardou* info. 
E3CH.B. Af f Ulatlor. Unknown. 79/-D2/O1. 2pp. 



DOCKET 30-33B North Anna Pouer fltatiom Unit 1 
NfiC not to increase Allowable tittlementi to hold 
"ublic hearlngftt to InvffBtlffJttB revocation of llcise 
>etcaui util ul-thhalif haianfoui trfo. 
iUWDHALM. J, Affiliation Unknown. 79/Ol/at. 2pp. 



DOCKET SO-338 North Anna Powar Station, Unit 1 
ie>TBWiit 39 to Policy MF-S7r u/change in liability for 

Elictrlc t.Poutr Co. 
*AB,T. Nuelaar Energy Llahllity Innuranca Aisoeiatlon. 



100 20 1 DOCKET SO-33B Morth Anna Pouier Station. Unit 1 
lonim-ent 51 to NELIA Policy NF-lBe^'jIWBmBnd of Condition 4 

bodtlv Injury or property damage jjlfurance cot for VA 
*ctric ti Power Co. * *".', 

1OEB,C,R. Nutlaar Energy Llabtlitu-'Tnsuranea Aitoclation. 
"01/03. IP.! 



79022HOI31 DOCKET 50-038 North Anna Pouer Station, Unit 1 
IE Insp Rept 30-339/76-13 on 7B12ia-13,No noncompl iance 
noted. Major area* Inspected : qual If jcatloni t< training of 
health phuttlcs personnel t. licensee audit! of radiation 
protection program. 

JENKINS. 0. R. i GIBSON, A. F, Region S. Atlanta. Fuel Facility t< 

Materials Safety Branch. 79/01/02, 5pp. 

79OBSB<Hi2 DOCKET 90-336 Worth Anna Power Station. Unit I 
Forwards IE Imp pt 50-33B/7B-42 on 7B1211-1S * notit.9 of 
violation. 

I.ONO, F. J. Region H, Atlanta, Reactor Operations Nuclear Support 

Branch. 79/01/O3. 3p. 

790HSZOU9 DOCKET SO-339 North Anna Pc-uer Station. Unit 1 
Notice of violation from inap on 7B1311-13. 

LDHO, F. J. Region 2. Atlanta. Reactor Operations Nuclear 

Support Branch. 79/C-1/O9. lp, 



DOCKETED ITEMS 



7902330167 DOCKET 5Q-33B North Anna Pouer Station, Unit i 

IE Insp Kept 30-330/78 12 on 701211-15 Noncomp 1 lance noted- 
turbine generator automatic stop oil functional test not 
performed prior to reactor startup on 781025. f. 23 temporary 
procedural changes not reviewed. 

* Renion 2, Atlanta, Reactor Operations Nuclear Support Branch. 

79/01/05. 7pp. 

7903Q10342 DOCKET 5O-33B North Anna Pouer Station, Unit 1 
Responds to 7B0314 app 1 lea t ion, ut i 1 7BOB22 Itr, !. 760903 
affidavit. Withholds Barton transmitter qualification test 
results from disclosure (ref 10CFR2. 790). 
PARR.O D. Light Water Reactors Branch 3 79/OI/S2. 4pp. 

79022B003Q DOCKEJ 50-339 North Anna Power Station. Unit 1 
Ack receipt of 790116 Itr informing NRC of stops taken to 
correct violation noted in, IE Insp Rept 50-33B/7B-33. 
SUTHERLAND, J. T. Region 2. Atlanta, Fuel Facility !< Materials 

Safety Branch. 79/01/26. lp. 

7902230031 DOCKET I5O-33B North Anna Power Station, Unit 1 
Responds to NflC 790105 Itr re violations noted in IE Inap 
Rept 50-338/78-33. Corrective actions: deta 1 1 ell procedures 
manual covering nonrad i otogical environ surveillance now in 

STALLINGS. C. M. Virginia Electric !. Pouer Co. 79/01/16. lp. 

7902230139 DOCKET 5O-33B North Anna Pouier Station. Unit 1 
Forwards IE Info Notice 77-01. "Qergen-Paterson Hydraulic 
Shack & Sway Arresters (HSSA1. " 

O'HEILLY, J. P. Region 3, Atlanta, Office of the Director. 

79/02/02. 5pp. 

790-3120316 DOCKET 30-338 North Anna Power Station, Unit 1 
Forwards. IE Bulletin 79-01 , "Environ Qualification of Class 
IE Equipment. " 

O'REILLY, J. P. Region 2, Atlanta, Office of the Director. 

79/02/05. 2pp. 

79Q221016B DOCKET 5Q-33B North Anna Power Station. Unit i 

Forwards IE Bulletin 79-O1, "Environ Qualification of Class 
IE Equipment." W/list of 11 systematic evaluation program 
plants for which no action is required. 

O'REILLY, J. P. Region 2. Atlanta. Office of the Director. 

79/02/08. 3pp. 

79Q22BQ163 DOCKET SO-33B North Anna Pouer Station. Unit 1 
Forwards IE Info Notice 79-03. "Ltroitorque Valve Geared 
Limit Switch Lubricant." 

O'REILLY, J. P. Region a, Atlanta, Office of the Director. 

79/02/09. Bpp. 



7903150369 DOCKET 5O-33B North Anna Pouier Station 
Forwards LER 79-OQ5/O1T-0 t, 79-OO8/01T-0. 
STALLING5. C. H. Virginia Electric t. PQUIBT Co. 



Unit 1 



IP- 



7902150373 DOCKET 50-33B North Anna Power Station. Unit 1 

LER 79-005/01T-0 on 790129: muff lers for emergency diesel _ 
generators not iseismicallu supported nor missile protected 
as renuired by FSAR, Caused by const error, ,,, 
CARTWRIOHT, W, R. Virginia Electric t, Power Co. 79/O2/12. Bpp. 

7902150374 DOCKET SO-338 North Anna Pouier Station, Unit 1 

LER 79-OOB/01T-0 on 79O129: design flow of 37 gpm to chargino. 
pump coolers could not bo met. Caused by 2 inch carbon BtiBl 
piping E. charging pump skid piping being too large to allow 

CARTWRIGHT. W, R. Virginia Electric & Power Co. 79/02/12. 2pp. 

7902190397 DOCKET 50-330 North Anna Power Station, Unit 1 

Forwards LER 79-006/03L-0, ,,, , 

BTALLING3,C,M. Virginia Electric b Power Co. 79/02/12. lp. 

7902150400 DOCKET 5O-33B North Anna Power Station, Unit 1 
LER 79-006/03L-0 on 79O1 1 1 ; damaged wiper seal found on 
hudraulic suppressor l-FW-HSS-233. Caused by poppet valves 
which control lock up rate being improperly set. Suppressor 
replaced w/operable spare suppressor. No danger to public. 
CARTWHIGHT.H. R. Virginia Electric H Payer Co. 79/O2/05. 2pp. 

7902320003 DOCKET 50-338 North Anna Power Station, Unit 1 
Forwards LERS 7B-OBO/03X-1, 7B-1O7/03X-1 t, 7B-OO1/O1X-1, 
STALLINQS, C. H. Virginia Electric t, Power Co. 79/02/13. lp. 

7902220005 DOCKET 50-33B North Anna Power Station. Unit 1 
LEH 7B-oao/03X-l on 7BOB15; unidentified reactor coolant 
leak of 1,93 gpm detected It repaired, but deviation rapt h 
LER were not submitted, 

CARTHRIQHT, W. R. Virginia Electric ii Power Co. 79/02/14. 3pp. 

7902220006 DOCKET 5O-333 North Anna Power Station, Unit t 
LEH 7S-107/03X-1 on 781O03: during steady state 1007. power 
operation, found that containment atmosphere partlculate & 
gas monitoring SUB were inoperable. Caused by repair of pump 
1-RM-159-B. 

CARTHRIQHT, W. R. Virginia Electric S, Pouier Co, 79/02/14. 2pp, 

7902320009 DOCKET 90-338 North Anna Power Station, Unit t 
LER 79-QQ1/01X-1 on 7901O3: potential nonconsorvati sm noted 
in calculations performed in monitoring axial power 
distribution FJ<2>. Caused by omission of ays d procedures 
used to monitor FJ(2), 
CARTHRIGHT, W. R. Virginia Electric & Power Co. 79/O2/14, 2pp. 



7902300043 DOCKET 90-33B North Anna Poiuer Station, Unit 1 
Forwards monthly operating rept for Jan 1979. 
BTrtLLINGS. C.M. Virginia Electric & Pouier Co. 79/02/13. 



7902260331 DOCKET 90-33B North Anna Payer Station, Unit t 
Forwards LER 79-017/01T-0. 
BTALLINOB. C. M. Virginia Electric t< Power Co. 79/O2/21. lp. 



7902200046 DOCKET 5O-33B North Anna Power Station, Unit I 
Monthly operating rept far Jan 1979. 
HOQDS.D. C. Virginia Electric (. Power Co. 79/02/09. 5pp. 

790202017B DOCKET 30-O3B North Anna Pouier Station, Unit 1 
Forwards LER 79-002/03L-0 & 79-003/03L-Q. 
STALLINOS, C.M. Virginia Electric i Power Co. 79/01/30. lp. 

79020301B4 DOCKET SO-33S North Anna Power Station. Unit I 
LER 79-002/03L-0 on 790101 ; dorino normal operation, pump 
1 _ R M-p- 1 59A tripped on overload. Containment particulate 
sample flow was lost, rendering inoperable 1 reactor coolant 
leal detection su*, due to deficient Federal 1206LLT bearing. 
CARTWRIOHT. U. R. Virginia Electric & Power Co. 79/01/29. 2pp. 

7903020167 DOCKET SO-33B North Anna Pouer Station, Unit 1 
I_ER 79-003/03L-O on 7901 02: during periodic test, noted that 
containment isolation valve TV-SV-102-1 would not hut 
fully. Cause undetermined. 
CARTHRIOHT.U.R, Virginia Electric t< Power Co. 79/O1/29. Spp. 

7"502Oo0305 DOCKET 30-338 North Anna Pouier Station. Unit 1 
Forwards LERs 77-OO4/03L-O !, 79-007/03L-0. 
STALLINQS, C. M, Virginia Electric t. Pouier Co. 79/03/02. lp. 



7902260333 DOCKET 50-338 North Anna Power Station- Unit 1 
LER 79-017/01T-0 on 790212: during axial power distribution 
monitoring SUB failure on 790206, FO survey computer program 
could not monitor axial power distribution. Caused bu 
incorrect power inputs from process computer. 
CARTWRIOHT. W, R. Virginia Electric fc Power Co. 79/02/20. 2pp. 



7902260417 DOCKET 30-338 North Anna Power Station, Unit 1 
Forwards LERs 79-01Q/03L-Q t. 79-012/03L-0. 
STALLINQB, C. M, Virginia Electric fe Pouier Co. 79/02/21. 



7902260453 DOCKET 50-330 North Anna Power Station, Unit 1 
LER 79-01Q/Q3L-Q on 790127: during calibr of containment 
particulate monitor RUB 159 in Mode li instrument read low 
for known radiation level. Caused by detector high voltage 
setting being set too low. 
CARTWfilOHT, W. R. Virginia Electric & Power Co. 79/02/20. 



7902260460 DOCKET 50-338 North Anna Power Statiom Unit 1 
LER 79-012/03L-0 on 790127: unidentified primary coolant 
leakage greater than 6 gpm noted. Caused by blown packing 
on residual heat removal isolation valve MOV-1700 b 
packing leak an pressuriier spray valve PCV-1459A. 
CARTWRIOHT, U. R. Virginia Electric (. Pouter Co. 79/02/20. 



2pp, 



2pp. 



7902060309 DOCKET SO-338 North Anna Power Station, Unit 1 
LEfi 79-004/03L-0 on 79010B; during 1-PT-36-HA) found that 
steam generator 3 Hi HI level teat panel was faulty, 
preventing tost of this channel. Caused dy faulty universal 
logic card on test panel. 
CARTUfUGHT.W. H. Virginia Electric !< Power Co. 79/02/01. 



2pp. 



7902060313 DOCKET 5O-339 North Anna Power Station, Unit 1 

LER 79-007/03L-0 on 7S1 1 16: during normal operation, fire door 
S54-5 botuieen Unit 1 emergency switihgear room E> cable vault 
was sprung & would not make a tight seal, evidently due to 
attempt to free it while stuck. 
CARTWHIfiHT.W. R. Virginia Electric t. Power Co. 79/02/01. 2pp. 



7902270398 DOCKET 90-338 North Anna Pouier Station. Unit 1 
Forwards LER 79-01 1/03L-0. 
STALLINBB, C. H. Virginia Electric t. Pouer Co. 79/02/22. lp. 

7903270403 DOCKET 50-33B North Anna Power Station, Unit 1 
UER 79-011/03L-0 on 790126: fire door BS34-9 uia* 
nonfunctional. Caused bu removal of latch from door by person 
or persons unknown. 
CARTWRIOHT, H. R. Virginia Electric & Poyer Co. 79/02/22. 2PP. 



DOCKETED ITEMS 



7902070092 DOCKET 50-339 North Anna Power Station, Unit 2 
Confirm 790133 phone conversat ion. Requests security badge 
for AH Johnson to allow him access to protected area. 
KENNA.W. B. Region S, Atlanta, Safeguards Hranch. 79/01/24. Ip 

7902090291 DOCKET 50-339 North Anna Pouier Station, Unit 2 
Forwards safety evaluation relating to 7S0501 request for 
uthorllation to increase storage capacity of spent fuel 
storage pool, a/a encl. 
PARR. D. D. Light Hater Reactors Branch 3. 79/O1/31. Ip. 

7902230223 DOCKET 90-339 North Anna Power Station. Unit 3 
Requests renewal of license SWI-1B01 t, extension of 
eiplration date to 791301 or conversion of CPPR-7B to 
operating license, whichever in earlier. Info supplied 
W/771O03 application is still applicable. 
STALLING^, C. M, Virginia Electric & Pouier Co. 79/01/31. Ip. 

790313010S DOCKET 50-339 North Anna Power Station, Unit 2 
Discusses modified startup physics testing program. Forwards 
lists of tests to be per formed, tests that ware performed 
during Unit 1 startup, tests deleted for Unit 3, t* relevant 
FBAR Chapter 11 sections. 
BTALLINOS, C. M. Virginia Electric * Power Co. 79/02/OS. 10pp. 

7902230103 DOCKET 30-339 North Anna Potuer Station, Unit 2 
Document* & suppls original info given to AH Dromoricl re 
qualification tests on reactor vessel bolting matl.All 
baiting matl met A8ME cade requirements. 
DROHN,B.C. Viroinia Electric t, Power Co. 79/02/20. 3pp. 

790227024B DOCKET 30-339 North Anna Power Station, Unit 2 
Forwards substitute page for heat load comparison table 
originally submitted 780301. Corrects typographical error. 
BTALLINOB, C. M. Virginia Electric & Power Co. 79/02/32. Hpp. 

7902060102 DOCKET 30-339 North Anna Power Station, Unit 2 

Brief in opposition to intervention of Citiiqns Energy Forum 
fa Potomac Alliance re proposed spent fuel storage pool 
*ipaniion. Urges haste in denying intervention. H/Certiflcate 
of five. 

MAUPIN, M. U. , CHRISTMAN, J. N. , R1NACA.J.M. Hunton & Williams. 
79/01/17. 34pp. 

7902180MB DOCKET 3O-339 North Anna Power Station, Unit 2 

Ack receipt of Coalition 790114 Itr which has been forwarded 

to counsel for both parties. 

ALLEN.J. North Anna Environmental Coalition. 79/01/17. Ip. 

7902130230 DOCKET 50-339 North Anna Power Station, Unit 2 
Response by util to NRC 790109 evaluation at pumphouse 
settlement. Asks for man allowable average svc water 
settlement of .33 feet t> revision of Tech Spec 4.7.13.1, 
Certificate of Svc encl. 
CHRISTMAN, J. N. Hunton t Williams. 79/O1/19. 3pp. 

7902190124 DOCKET 50-339 North Anna Power Station, Unit 2 
Forwards BAND77-1927 "Transport of Rad ionuc lidos In Urban 
Environs: Working Draft ABSessment. " M/o end. 

ODLDBEROiB. C. Office of the EiHciltive Legal Director. 79/01/2S. 
2pp. 

79080B0094 DOCKET 50-339 North Anna Power Station, Unit 2 
Reverses 7B121? denial of intervention, finding sufficient 
Interest in the proceeding in petitioners' geographical 
pronimlty to & recreational activity in the vicinity of 
facility. 

DUFLD.M.E. Atomic Safety nnd Licensing Appeal Panel. 79/01/26. 
6pp. 

7902220156 DOCKET SO-339 North Anna Pauier Station, Unit 2 
NRC hs reviewed util response to NRC evaluation of 
pumphouse settlement. Agrees that proposed Tech Spec 4.7.13.1 
Is inappropr iatei would require retroactive monitoring of 
ground water flow rates. H/encl change. 

BWAN9QN, D. T. Office of the Eiecutive Legal Director. 79/01/29. 
3pp. 

7902270452 DOCKET 50-339 North Anna Pouier Station, Unit 2 
Urges NRC not to increase allouiable settlement, to hold 
hearing, & to investigate possible license revocation because 
util withheld hazardous info. 
RICH-B. Affiliation Unknown. 79/02/01. 2pp. 

7902270470 DOCKET 5O-339 North Anna Power Station, Unit 3 
Urges NRC not to increase allowable settlement, to hold 
public hearingitc to investigate revocation oP license 
because util withheld hazardous info. 
8UNDHALM, J. Affiliation Unknown. 79/01/31. 2pp. 

7902080213 DOCKET 5O-339 North Anna Power Station, Unit S 
Endorsement 39 to Policy MF-37, in/changes in liability for 
VA Electric & Power Co. 

OERAB,T. Nuclear Energy Liability Insurance Association. 7B/12/14 
IP. 



790208O306 DOCKET 50-339 North Anna Power Station, Unit 2 

Endorsement 31 to form part of NELIA Policy NF-IB&, , Hi/amend 
of Condition 4 re bodily Injury or property damage insurance 
coats For vA Electric t. Poiuer Co. 

HARDES.C.B Nuclear Energy Liability Insurance Association. 
79/01/03 1 . Ip. 

79020B0217 DOCKET 30-339 North Anna Pdiuer Station, Unit H 
Endorsements 2 to form part of Binders EH-27 t. EQ-2B,u/ 
changes in liability for VA Electric t, Power Co. 

OERAB, T. Nuclear Energy Liability Insurance Association. 79/O1/L3. 
Ip. 

7902200025 DOCKET 5O-339 North Anna Power Station, Unit S 
Endorsement for calendar year 1979 for NELlrt Policy NF-1B6. 
* Virginia Electric b Pouier Co. 79/01/20. Ip. 

7902260461 DOCKET 50-339 North Anna Pouer Station, Unit 3 
Endorsement 22 to NELIA Policy NF-240 for calendar year 
1979. 
Nuclear Energy Liability Insurance Assoc Intion. 79/01/20. Ip. 

79020B01BO DOCKET 30-339 North Anna Power Station, Unit 2 
Forwards Endorsement 13 to HAELU Policy MF-96. 
KELLEV.P.L. Johnson !. Higgina Insurance. 79/O1/31. Sup. 

79O226OH7 DOCKET 50-339 North Anna Power Station. Unit 3 
Forwards IE Insp Repts 50-333/79-40 (. 50-339/70-33' on 
7B1106-1209. No noncomp 1 ianco noted. 

LONG. F. J. (legion 2, Atlanta, Reactor Operations: Nuclear Support 

Branch. 78/12/29. 2pp. 

7903360122 DOCKET 30-339 North Anna Power Station, Unit 3 

IE Insp Repts 50-33B/7B-4Q I, 50-339/78-33 on 7B1 1 Qb-lSOB. Ho 
noncomp 1 lance noted. Major areas intpec tod: LERe, sp ant fuel 
pit embedments, settlement of Class 1 structures, 
prooperational testing t, figs comparison to FSAR drawings. 
K!DD,M B, , LEWIS, R.C. Region 2, Atlanta, Reactor Optra t ions 

Nuclear Support Branch. 76/12/28 llpp. 

79022B0119 DUCKET 50-339 North Anna Power Station, Unit 3 
Forwards IE Insp Ropt 5O-339/7B-3i. on 7B1211-14, No 
n one amp 1 is nee noted, 

HURFHVjC.E. Region 2, Atlanta, Reactor Construction ti Englneorlng 

Support Branch. 79/01/03. 2pp. 

79022(30123 DOCKET 30-339 North Anna Pouier Station, Unit 2 
IE Insp Rept 50-339/7B-36 on 7B1311-14, No none amp 1 innca 
noted, Major areas inspected: 1 icensea action on reviewing 
engineering repts, 10CFR3O. S5(t>) items. & (1ft program 
documentation 

MCFARLAND, C.tl, , HERDTiA.H. Region 3, Atlanta. Reactor 

Construction ti Engineering Support fir a rich. 79/OI/O2. 6pp. 

79023B0111 DOCKET 30-339 North Anna Pouier Station, Unit H 
Forwards IE Insp dept 50-339/70-37 on 7Bia30-21.Na 
noncomp liance noted. 

MURPHY, C, E. Region 2, Atlanta, Reactor Cdno true t ion t, Engineering 

Support Branch. 79/01/OB. 2pp. 

79022B0114 DOCKET 3O-339 North Anna Pomer Station, Unit 2 
IE Insp Rept 30-339/7B-37 on 701220-21. No noneomp 1 lance 
noted. |Ma jor areas Inspec ted: remote control insp tool colibr 
procedures, insp program ti related records. 
ECONOHOS-N. , CONLON, T. E. Region 2, Atlanta, (lone tor 

Construction d Engineertns Support Dranch. 79/O1/03. 3pp. 

7903010313 BOCKET SO-339 North Anna Power Station. Unit 2 
Responds to 7BOB14 application, util 7B0322 Itr, ti 7&O903 
affidavit. Withholds Barton transmitter qualification teat 
results from disclosure (rof 10CFR3, 790). 
PARR.O.D. Light Water Raactors Branch 3. 79/01 /H3. 4pp. 

7902050152 DOCKET 30-339 North Anna Pouier Station, Unit 3 
Forward* requests for oicoptians to inservice te-atlno 
requirement* for pumps fc valves. 
STALLINOS. C. M. Virginia Electric tt Pouier Co. 79/01/31, 31pp. 

7902230139 DOCKET 90-339 North Anna Pouier Station, Unit 3 
Forwards IE Info Notice 79-01, "Borgen-Patorsan Hydraulic 
Shock b.Sway Arresters (HSBA). " 

O'REILLY, J, P. Region 3, Atlanta, Office of th* Director, 

79/02/02. 3pp. 



79022B032? DOCKET HO-339 North Anno Power Station, Unit H 
Forwards IE Bulletin 79-01, "Environ Qiral i f icat i on of Class 
IE Equipment," W/list of 11 systematic evaluation program 
plants for which no action is required. 

D'REILLY, J. P. Region 3, Atlanta, Office of the Director. 

79/02/OB. 2pp. 



as 



7903260163 DOCKET 50-339 North Anna Power Station. Unit 
Forwards IE tnfo Notice 79-03. "Limi torque Valve Geare 
Limit Suited Lubricant. " 

Q'REILLV, J. P. Region, 2, Atlanta, Office of the Dire 

79/02/09. 3pp. 



DOCKETED ITEMS 



7902370374 DOCKET 3O-339 North Anna Poiuor Station, Unit S 
Provides flddl info pertinent to NRC evaluation of suppl 
neutron ah ie Id. Info does not change conclusion in App SA of 
FSAR, submitted 790131. 
DROWN. S. C. Virginia Elc-ctric & Power Co. 79/03/32. Ip. 



79O2Q2O341 DOCKET 50-339 North Anna Pouer Station, Unit 3 
In compliance u/ 10CFP.5O, 55E. forwards rept "Description of 
Neutron Sup pi Shield." describing collar/saddle shield !< 
radiation analysis performed to determine adequacy of suppl 
shield. 
QRWON.S. C. Virginia Electric (, Power Co. 79/01/31. 2pp. 



7 9 O2 02024 2 DOCKET 50-339 North Anna Pouer Station. Unit 3 
"Doscrlpt i on of Neutron Buppl Shield." Deicribes collar/ 
saddle sftinld fc radiation analysis performed to determine 
adequacy of suppl shield t, comprehensive reevaluation of 
pressure vessel support sys. 
" Virginia Electric & Pouier Co. 79/01/31. B9pp, 



79O2D6017S DOCKET 50-339 North Anna Pouer Station, Unit 2 
In response to 781220 Itr.uill install melded caps on 
outside containment ends of all 29 spare containment pipe 
penetrations, 
BROWN) B.C. Virginia Electric tt Power Co. 79/02/01. Ip. 



7902090394 DOCKET 30-339 North Anna Pouer Station. Unit S 
Submits interim rept re notification that aiial pouer 
distribution monitoring s-ys provided by Uestlnghouse does 
not account for In-core move able detector background signal 
when determing axial flui shape. Foresees potential problem. 
DROHN.S.C. Virginia Electric tt Pouer Cn. 79/02/05. Ip. 

7702130202 DOCKET 3O-339 North Anna Pouler Station, Unit 2 
Provides Info re lack of seismic supports & missile 
protection for emergency dlesel generator muffler*, per 
10CFR50. 33Ie) 
DROWN, S.C. Virginia Electric & Pouer Co. 79/02/05. 2pp. 

7702130133 DOCKET 50-33 1 ? Worth Anna Power Station, Unit a 
Engineering evaluation r& ueld hum d splatter on interior 
surface! of high density spent fuel racks is complete. 
Determined that wold splatter sufficient to potentially tear 
or deform fuel assembly grid straps doei eiist. 
BROWN, S.C. Virginia Electric !. Pouer Co. 79/OB/07. Ip. 

7702120119 DOCKET 90-339 North Anna Pouer Station, Unit 2 

Provide* flddl info on 79 01 OB b 790112 1-epts. Di (cusses tests 
OF a*ld svc uiater piping revealing fouling of several 
lections due to inadequate e leaning. Hi 1 1 clean b restore 
piping & coalers. Considers this final rept. 
DROWN, S.C. Virginia Electric V Power Co. 79/03/07. Ip. 



7902140104 DOCKET 3O-311 Enrico Fermi Atomic Pouer Plant, Unit 2 
Requests addl info by 790256 re method of analysis for 
turbine transient. Info not included in App 10A to FSAR filed 
In Amend 19 on 790114. 
8TOLZ.J.F, Light Water Reactors Branch 1. 79/01/89. 29pp. 

7902140006 DOCKET 50-341 Enrico Fermi Atomic Power Plant, Unit 2 
Summarizes 790116 plant visit to observe !i discuss safety 
features. Areas vl sited: control rnomi reactor bldg rafueling 
floor, torus, dryuell under reactor vessel, turb ine bldg floor 
(t cooling tower. 
KINTNER.L. L. Light Water Reactor* Branch i. 79/01/29. 3pp. 

7902030193 DOCKET 50-341 Enrico Fermi Atomic Power Plant, Unit S 
Submit* DHC 197S program activity review, comprised of Info 
from selected sections of monthly rept, w/sectlon on contract 
& billing status removed. Li sts meetings held i< provides 
task-by-taak activity summary. 

SOHONiL.J. General Electric Co. .Nuclear Energy Products Dlv. 
79/02/03. 10pp. 

7902220054 DOCKET 30-341 Enrico Fermi Atomic Power Plant, Unit 2 
Forwards Natl Pollution Discharge Elimination ago permit MI 
0037028 covering dischargee during plant operation, & permit 
MI OO39363 authoriiing discharge of uater from matl dredged 
from Lake Erie t. placed in disposal basin. 
JENB.W. Detroit Edison Co. 79/02/09. 23pp. 

7902260306 DOCKET 30-341 Enrico Fermi Atomic Power Plant, Unit 2 
Lists key points omitted from NRC 790104 meeting notes: 
meetlnos uill be held on specific technical matters! NRC 1* 
attempting to maintain schedule) schedule it b*>ed on late 
start date & June 1990 fuel load. 
JENB.W. H. Detroit Ellison Co. 79/02/li. 2pp. 

7902210194 DOCKET 30-341 Enrico Fermi Atomic Power Plant, Unit 3 
Foruards more legible copies of Figures 3-2,3-4,3-4,3-3 b 
S-i for security plan submitted In Jan 1979. End withheld 
(ref 10CFR2. 790). 
JENS.U.M. Detroit Edison Co. 79/02/01. Ip. 

7902030047 DOCKET 30-341 Enrico Fermi Atomic Power Plant. Unit S 
Informs of 790125 meeting to refine contentions. Urge* 
recipient to contact NRC to establish acceptable date. 
MCOURFiEN.H. J. Office of the Eiecutive Legal Director. 79/01/17 
Ip. 



7902120154 DOCKET 50-339 North Anna PouBr Station, Unit 2 
Submits addl info 7(30928 rept re deficiencies of embedded 
restraint assemblies of upper supports of steam generators. 
Incorporates changes re mods of assumptions concerning 
distribution of loads in upper support sys, 
BHDWN.a.C. Virginia Electric fc Pouer Co. 79/02/07. 2pp. 



7902140200 DOCKET 30-341 Enrico Fermi Atomic Pouar Plant, Unit 2 
Notifies NRC that unique containment' design info uias 
submitted as part of FSAR Section 3. B, Amend 12, as uell as a 
generic MarV 1 Owners group rept (NEDO-21BBB "Containment 
Program Load Definition, Dec 197S"). 
JENa.W.H. Detroit Edison Co. 79/02/09. Ip. 



7902130182 DOCKET 5O-339 North Anna Pouer Station, Unit 2 

Discusses need for mechanical properties test or replacement 
of hex head baits Far hijn density spent fuel storage racks. 
Bolts replaced Sr properly documented. 

a C. Virginia Electric i Pouer Co. 79/02/09. Ip. 



7902H021B DOCKET 3O-341 Enrico Fermi Atomic Pouer Plant, Unit S 
Foruards binders tt sets of divider tabs for UCB W/NEDD-21BBB 
"Mark 1 Containment Program Load Definition Rept. " 
SODON,L.J. Oeneral Electric Co. .Nuclear Energy Products Dlv. 
79/01/OQ. Gpp. 



790213012S DOCKET 50-339 North Anna Power Station, Unit 2 
Follouup to 7901 1O interim rept. Discusses cause of failure, 
corrective actions completed, & scheduled repairs re breaks 
in vc water reservoir spray header piping. 
DROWN, B.C. Virginia Electric k Power Co. 79/02/09. 2pp. 

7902310249 DOCKET SO-339 North Anna Pouer Station, Unit 2 
Deficiency in ailal power distribution monitoring sys 
resolved by KB sting bouse lowering input values. 
BROHN.B.C. Virginia Electric tc Power Co. 79/02/16. Ip. 

7902230139 DOCKET 50-339 North Anna Power Station, Unit 2 
Informs NRC of steps taken to correct deficiency in 
calculating axial Flux shape Fj(2). Corrective actions: neui 
procedure will require operator to review flux traces used 
by ailal power distribution monitoring lys. 
BBOHN, S. C. Virginia Electric t, Power Co. 79/03/16. Ip. 

7902230179 DOCKET 30-339 North Anna Power Station. Unit 2 
Informs NRC of steps taken to correct error In calculation 
at LOG A peaking Factor shape limits. Corrective action: 
implementation of a-dmini* trative procedure to louer input 
valuas by i.5y, to atcomodate nonconservatlsm. 
BROHN.a.C. Virginia Electric b Power Co. 79/02/16, Ip. 



7902220257 DOCKET 50-341 Enrico Fermi Atomic Power PUnt, Unit 2 
Responds to 790111 reg.uest for review of paper "Vent 
Clearing During Simulated LOCA In a Mark I BUR 
Pressure-Suppression Sys. " Recommend! paper be accepted for 
publication, 
ORIHE3.C. Plant Systems Branch. 79/01/31. 2pp. 

7902220239 DOCKET 30-341 Enrico Fermi Atomic power Plant, Unit 2 
Foruards IE Insp Rept 30-341/7B-1B on 781113-17 fc notice of 
violation. 

HEIBHMAN.R. F. Region 3, Chlcaooi Reactor Construction tc 

Engineering Support Dranch. 79/01/03. 2pp. 

7902220241 DOCKET 30-341 Enrico Fermi Atomic Pouer Plant, Unit E 
Notice of violation from Insp on 7B1113-17. 
* Region 3, Chicago, Office of the Director. 79/01/03, Spp. 

790222024B DOCKET 30-341 Enrico Fermi Atomic Power Plant- Unit S 
IE Insp Rept 90-341/7S-1B an 781 1 13-17. Noncomplianee noted: 
failure to control special processes ti document test 
resultsi failure to properly store ti protect equip/Dent! 
failure to asiure minimum Inspector qualifications. 
ERBiC.rt., NAIDU,K.R.< HAYES, D. W. Region 3, Chicago, Office of 

the Director. 79/01/03. 24pp. 



7902360107 DOCKET SO-341 Enrico Fermi Atomic Pouer Plant, Unit 
Forward i IE Insp Rept 30-341/7B-SO on 7B131H-14. No 
none amp 1 lance noted. 

HEISHHANrR.F. Region 3, Chicago, Reactor Construction Ic 

Engineering Support Dranch. 79/01/12. Spp. 



DOCKETED ITEMS 



7908260110 DOCKET SO-341 Enrico Farmi Atonic POUIBT Plant, Unit 2 
IE Imp Rept 30-341/78-20 on 7B1S12-14, No noncompllance 
noted. Mnjor areas inspected : reactor coolant pressure 
boundary piping maiding. safety-related piping b melding. 
LEE.E.H., DAN1ELSON, D. H. (legion 3i Chicago, Reactor 

Construction b Engineering Support Branch. 79/01/OS. 5pp. 



7902130069 DOCKET 50-344 Trojan Nuclear Plant, Unit 1 

NRC answer oppoiing request for stag by Coalition for Safe 
Power pending lattsr't appaa 1 . Cone ludes intervenoT fails to 
Show that 1OCFR2. 78B(e) favors stay pending appeal of 7B1321 
ASLB partial initial dec i a ion. U/Certi f icate of Svc. 
QFAY,J.R. Office of the Eiecutlva Legal Director. 79/01/19. 



87 



17pp. 



79022B0193 DOCKET 30-341 Enrico Fermi Atomic Pouier Plant, Unit 2 
Forwards IE Insp Rept SO-341/7B-19 on 7B1127-30, No 
noncompliance noted. 

HEISHMAN, R. F. Region 3, Chicago. Reactor Construction & 
Enoineerino Support Branch. 79/01/li. 3pp. 

7902380300 DOCKET SO-SIl Enrico Fernt Atomic Pouier Plant. Unit 
IE In*p Rept 30-341/70-19 on 781137-30. No noncompl ianco 
noted. Major areai impacted: elactri c cable terminations. 
peronnel training. contractor QA/QC program, revieu of 
document records ti actions of previous items, 
HUSHES, J. . BARRETT, P. A, , SPES8ARD, R. C. Region 3. Chicago, 
Reactor Construction t Engineering Bupport Branch. 79/01/09. 



7pp. 



7902120102 DOCKET 30-311 Enrico Fermi Atomic Pouier Plant, Unit 2 
Poruiardi IE Info Notice 79-01. "Bergan-Paterson Hydraulic 
Bhoek b Sway Arrester* (H88A). 

HEPPLER, J. 0. Region 3i Chicago. Office of the Director, 79/OE/02, 
Ip. 

7902210210 DOCKET 30-341 Enrico Fermi Atomic Power Plant. Unit 2 
Forward* IE Bulletin 79-01, "Environ Qualification of Clan 
IE Equipment. " W/llst of 11 s>tomatic evaluation program 
plant* for uiflich no action li required. 
KEPPLER.J.O. Region 3. Chicago. Office of th Director. 79/03/O9. 



7902870340 DOCKET 30-341 Enrico Fermi Atomic Power Plant. Unit 3 
Forwards IE Info Notice 79-03, "Llmitorque Valve Oeareil 
Limit Switch Lubricant. " 

KEPPLEfliJ.Q. Region 3, Chicago. Office of the Director. 79/03/09. 
Ip. 

7?022fl03a? DOCKET 30-341 Enrico Fermi Atomic Pouier Plant, Unit 2 
Forward i 79021B Interim statue deficiency rept EF2-44030, 
"Torui Shell Indication at Ring Beam Attachment Meld 
Enlargement," for 30-day period. Discusses weld repair 
determined bij magnetic particle or liquid penetrant. 
FAHRNER.H. J. ' Detroit Ed i ton Co. 79/02/21. 3pp. 

7902220119 DOCKET 90-344 Trojan Nuclear Plant, Unit 1 

Inform* that TRADOC Pamphlet 300-30, "Intrerviee Procedure* 
for Instructions! Bu, Development" referenced in NURE9-Q219 
Ifl available in microfiche farm from NRC. 
BHBAW.W. J, Division of Document Control, 79/01/09. 2pp. 



79093604DB DOCKET 90-344 Trajan Nuclear- Plant, Unit 1 
Rov 3 to iecuritu 'plan for facility. Plan withheld 
(raf IQCFTtB. 790). 
Portland Oeneral Electric Co. POE-1017, 79/01/31. 



Ip. 



7702360173 DOCKET 30-344 Trojan Nuclear Plant, Unit 1 

"Fire Protection in Operating Nuclear Pouier Stetioni. " Page* 
(21-34 onlu. 

HERMAN, L. P., TOWNLEY, J. P. . HALL, R. E, Broohven National Laboratory. 
EY-76-C-QB-001A, BNL-NUREO-B3721. 77/13/31. Spp. 

79022*0189 DOCKET 30-344~Trojn Nuclear Plant, Unit 1 

Forward* POE-1012, Amend 7. "Fire Protection Review," Dec 
1977, Ut 11 uilll replace iprlnhlnr g* in cable ipreading room 
w/iMter dluga tgt. Addl fire tuppretilon not justified. 
OOODWIN, C. Portland General Electric Co. 70/01/16. Ip. 

7902260193 DOCKET 30-344 Trojan Nuclear Plant, Unit 1 
POE-lOia, Amand 7, "Fire Protection Review." Plan commit* 
util to replace iprlnkler *y in cable ipreading room 
w/water deluge igi. 

LIPPINCOTT.B.M, Portland Ooneral Electric Co, POE-1012, 
77/12/31. HBpp, 

790S0903B4 DOCKET 30-344 Trojan Nuclear Plant, Unit 1 

Requait bu Columbia Environ Council for ttag op 7B1226 ABLD 
partial Initial declelom permitting interim operation of 
unit. Supporting documentation. affidavit* & Certificate of 
Svc end. 
BCDTTiE. Columbia Environmental Council. 79/01/03. 40pp. 

790a0203B4 DOCKET 30-344 Trojan Nuclear Plant, Unit 1 
Danie* NflC motion to itrike application of Intorvenor 
Coalition for Safa Pouier for a itau, pending appeal of 
781281 ABLE partial Initial decliion. Orantt NRC altarnatlva . 
action for waiver of page limitation. 
DUFLQ,M. E. Atonic Bafatu and Licencing Appeal Panel. 79/01/18. Ip. 



7903140010 DOCKET BO-344 Trojan Nuclear Plant, Unit 1 

Forward* propoiad ichedule for Phaie 3 Trojan control bldg 
erace>at11n|. 

Lowintteln, Newman, Ret*, Axelrad b Toll. 79/01/18. 



7902330053 DOCKET 30-344 Trojan Nuclear Plant. Unit 1 

Anwer In opposition to petition for stay filed bv Coalition 
for Safe Power. Urges that iesuei be reaolveJ in favor of 
interim operation b that intervunar has not made showing of 
danger. Certificate of Svc oriel 
SOCOLOF8KY, J. H. , REDDEN. J. A. Oregon, atate of. 79/01/19. 4pp. 

7903260073 DOCKET 50-34H Trojan Nuclear Plant. Unit 1 
Answer of licaniae to 790103 Columbia Environ Council 
reque*t for itaij order. Urges denial at request because CEC 's 
failure to appeal decision precludes it from locking a stay 
under 10CFR2. 7BB. 

JOHNSQN.R.W. Portland Oeneral Electric Co. AXELROD,H. 
LDUVnateln. Newman, Rail, Axelrad Ei Toll. 79701/19. 10pp. 



79022B0080 DOCKET 30-344 Trojan Nuclear Plant. Unit 1 

Motion to itrike certain attachment* to Columbia Environ 
Council request for stay order. Urges Board to itrikB 
Attachment! 1 & 3 to 790103 request. line B they eicted 10- 
page limitation, W/Certi f icflte of Svc. 

JOHNSON. R, W. Portland General Elactrlc Co. AXELROS, M. 
LoiuBnstein.Neiuman.fieUi Aielrad SiToll. 79/01/19. 4pp. 



7902130131 DOCKET 80-344 Trojan Muclear Plant. .Unit 1 
Intervenor Coalition for Safe Power'* answer to util's 
motion to (tribe documents urging denial of motion. Document 
at lnue li exhibit, not pleading) A8LAQ ii not required tn 
decide upon adml *>lon. Certificate of Bvc end. 
ROSALIE.E, Coalition for Baffl Pouier. 79/O1/H3. Spp. 

79030600B1 DOCKET 50-341 Trojan Nuclear Plant, Unit 1 
Oral arguments on appeals of EM uarrett b State of OR 
from A8LB 7B1003 initial decision will b* heard 79021ft in 
Portland, OR, Grant* 40 minutes for each argument) raquii-ts 
notification of namei of counsel bu 790307. 

DUFLO.H. E. Atomic Safetg Bnd Llcenilng Appeal Panel. 79/01/28. 
2pp. 

7902260237 DOCKET 30-344 Trojan Nuclear Plant, Unit 1 

NftC doei not Intend to file formal reipanie to llceniae'i 

790119 mution. 

ULHAN.M.u. Office of the Eiecutive Legal Director. 79/01/36. Ip. 

7903210016 DOCKET 80-344 Trojan Nuelear Plant, Unit I 

Qapoiei eiceptlon* of intarvenor Btate of OR dtd 781113. 

Argues that ABLD 781008 decision athoriilng increases, of 

storage capacity of spent fuel pool LIB* correct. Certificate 

of Svc oncl. 

ORAY.J.R. Office of the Eiecutive Legal Director. 79/01/29. 49pp. 

7908260118 DOCKET 80-344 Trojan Nuclear Plant, Unit ! 

Consolidated intarvenors request Portland QE to respond to 
Interrogator it uiltnln 14 d*yj of svc. 
DELL.N, Affiliation Unknown, 79/01/29. 3pp. 

7903030067 DOCKET 50-344 Trnjan Nuclear Plant. Unit i 

Denis* intervenors' motion* for a stay of ff ctivene of 

A8LD 7B1221 partial Initial decision on interim operation, 

ineu mov*nt have not provided sufficient ju*tif ication for 

granting requestad ctau rell*f. 

DUFLD, M. E. Atomic Safety and Licensing Appeal Panel. 79/01/30. 

10pp. 

7903060039 DOCKET 30-344 Trojan Nuclear Plant, Unit 1 
Intervenes* are to file contentions bu 790D26 d clou 
discovery by 7903BB, after which evidentiary hearing re 
Ph** 3 itiues uill commence. 

HILLER.M.E. Atomic Safety and Licencing Hoard Panel, 79/01/30. 
2pp. 

790222014& DOCKET 30-344 Trojan Nuclear Plant, Unit 1 
9uppl re*pon*e* to consolidated lnterven&r 790B14 
Interrogatories. Meeting note*. tketchei b Cartificate at Svc 
*ncl. 

BROEHL, D. J. , FREWINOi d. L. , DAMON, D, L. Portland Qeneral Electric Co. 
79/02/01. 29pp. 

7902220149 DOCKET 30-344 Trojan Nuclear Ptanti Unit ( 

Buppl responie to BH Hillingham't 780911; InterrogatarieB, 
BROEHLrD.J., JOHNSON, R. W, , DAMON, D. L. Portland Deneral El at trie 
Co. 79/03/01. 2pp, 

7903220192 DOCKET 30-344 Trojan Nuclear Plant- Unit 1 
Suppl re*pon** to Coalition for Safe Power's 7B0906 
interrogatories. Supporting dociimentatianraff idavlti tt 
Certificate of Bvc end. 
JOHNSON, R, W, Portland General Electric Co. 75VOS/CH, llpp. 



3pp. 



DOCKETED ITEMS 



7902230-326 DOCKET 5O-344 Trojan Nut 1 far Plant, Unit ! 

Informs that JR Cray uill argue on behalf of NRC. pursuant to 

ASLftB 790135 order. 

QHfiY, J. R. Branch 1 79/-03/Q6. Ip. 



79-0222022B DOCKET 50-344 Trojan Nuclear Plant, Unit 1 
De-nits 770203 nation of SM Garrett to postpone or-al 
argument, due to delay In request E. inconvenient e to NRC 
DUFLO.M E. Atomic Safety and Licensing Appeal Panel. 79/O2/Q3. 
3pp. 

7902120002 DOCKET 3O-344 Trojan Nuclear Plant, Unit I 
Responds tp FOIA 79Q10P request for documents re ECCS 
performance calculations k ca Iculat i onal errors identified 
by Ueitlnghcusa & Portland GE, t pipe cracks in plant. Ko-at 
are lent.u/all or portions of some withheld 
FELTOH. J. H. Division of Rules and Records. 79/O2/02. 2pp. 

7902120-033 DOCKET 50-344 Trojan Wuclear Plant. Unit 1 

IE Insp Rept SO-344/7B-G8 on 750919-17.29-30*1001-03, I. 

10O7-1Q, Supporting documentat i on re const mails end. 

HARVIN.L. J. , PATE.R.J. , SPENCEfJ, Q. S. Region 5. San Franc i sco, 

Reactor Construction E< Engineering Support Branch. 79/1D/30, 

56pp. 

7^03120036 DOCKET 90-344 Trajan Nuclear Plant. Unit 1 
"Containment Structure Tendon Surve i 1 lane e, One-Year 
Survei llance: Vo! l.fdjpt tc Proc eduret Vol 2. Test Data. " 
Concludts no abnormal degradation is Indicated For 
containment structure post-tension ing aija. 
Bechtel Power Corp. (Suos. oF Qeclitel Corp. ). 77/O3/31. 26Opp. 

7902Q301&S DQCKET 50-344 Trojan Nuclear Plant. Unit 1 

Forwards Endorsement 34 to AMI Pol icy NF-235 It Endorsement 

SB to MAELU Policy MF-B6nFor calendar year 1979. 

WILSON, F.K. Portland General Electric Co. 79/01/S9. 3pp. 

790S060243 DOCKET 50-344 Trojan Nuclear Plant. Unit 1 
Forwards copies of flmund 33 to FSAR, Changes are 
organizational, procedural b editorial h do not change 
acclttant occurrence probability or safety margin. 
GOODWIN, C. Portland General Electric Co. 79/O3/Q3. 3pp. 

7902060245 DOCKET 3O-344 Trojan Nuclear PJantj Unit 1 

Amend 33 to FSAR. Inc ludee updated version of QA program for 
operations m/Revisi one 3 & 1 & corrected drawings 8.3-31 ti 
B 3-44. 
Portland Genera] Electric Co. 79/Q2/O2. B9pp, 

790224.0200 DOCKET 30-344 Trojan Wuclear Plant. Unit 1 

Forwards Amend 22 to License NFF-1, safety evaluation, & 
Federal Register notice of issuance. Requests addl info as 
noted in safety evaluation. 
BCHMENCER.A. Operating fteattors Branch 1. 7B/O3./O 1 ?. 2pp, 

7902260203 DOCKET 50-344 Trojan Nuclear Plant, Unit 1 

Amend 22 to License NPF-1 changing Tach Specs re completion 

of mod-s far fire protection. 

BCHUENCEft.rt, Operating Reactors aranch 1. 70/03/09. Hpp. 

790a2b020B DOCKET SO-344 Trojan Nuclear Plant, Unit 1 
Support! Amend S3 to License NPF-l.Addl Info re smoke 
enhaust Fans, tpr InM er sys- ti remote ahutdoyn capability must 
bo lubrai tted. 
Office of Nuclear Reactor Regulation, 7B/03/09. 60pp, 



790321.0212 DOCKET 50-344 Trojan Nuclear Plant, Unit t 
Notice of inuanee of Amenrf 33 to LlcanBe HPF-1. 
SCHWENCER, A. Operating Reactors Branch 1. 73/03/09. 

7902EBO3B5 EDCKET 30-344 Trojan Nuclear Plant, Unit 1 

Aa follayup to NRC 7B1113 rq.uest Far lUbmittal of DFftitd 
Dose Calculation Manual for approval, forward a guidelines. For 
general contents oF manual. 

CRlriea.B. K. Assistant Director For Enoin*er & Projects. 

79/D1/1B, 5pp. 



2pp, 



79O227034B DOCKET 50-344 Trojan Nuclear Plant, Unit 1 
Furuiards License Change Application 47. Revision 1, 
requesting amend of License NPF-1 to modify security 
equipment. 
CODDHIN.C. Portland Oeneral Electric Co. 79/O3/BI. 



4pp. 



7903HBOE33 DOCKET 50-344 Trojan Nuclear Plant, Unit 1 

Responds to NRC 790326 request for addl Info re review of 
License Change Application 49. involving Me stinohouse 
Improved thermal design procedure It critical heat Flux 
corre lotion. 
GQDDUIN.C. Portland General Electric Co. 79/02/22, 3pp. 

79032t0047 DOCKET 30-344 Trojan Nucloar Plant, Unit 1 
Forward! IE Insp Rept 50-3-14/73-27 on 701313-20. No 
none amp 1 lane e no tad. 

SPENCER, S. a. Region 5, San Francisco, Reactor Construction & 

Engineering Support Branch, 79/01/10. 2pp. 

79O3360G4B DOCKET 50-344 Trojan Nuilear Plant, Unit 1 

IE Inap Ropt SO-344/7B-27 on 781318-SO. No noncomp llance 

noted. Ha jar areas inspected: procedures for spent fue) pool 

rack Installation, receiving Intp fc meld repairs to spent 

Fuel pc-ol racks, d open Items. 

ALBERT, U. G. , HERNANDEZ, 0. . HftYNES.R.C. Ragion S, San Francisco. 

Re-actor Cnnatructl-on & Engineering Support Branch. 79/01/09. 4pp 

7903080335 DOCKET 30-344 Trojan Nuclear Plant, Unit 1 
Forwards IE Insp Rept 5O-3fl4/79-01 on 7901OE-04. No 
none amp liance noted, Rept uithheldlref 1DCFR2. 79O). 
NORDERHAUG, L. H. Region S, Ban Franciacp. Safeguards Branch. 

79/OI/3O. 3pp. 

7903120124 DOCKET 50-344 Trojan Nuclaar Plant. Unit I 

Forwards IE InFo Notice 79-01, "Ceraen-Paterson Hgdraulic 

Shock & Sway Arresters (HSBAI. 

ENOELKEN.R. H. Region B, Ban FrancUcu, Office of the Director. 

79/OS/02. Ip, 

790323D071 DOCKET 9O-344 Trojon Nuclear Plant, Unit 1 

Forwards IE Bulletin 79-O1, "Environ Qual i Fica.tion of Clasi 

IE Eq.nlpnent. " W/litt of 11 systematic evaluation program 

plants for uihlirh no action ,1s required. 

ENOLEKEN.R, H. Region S, San Francisco, Office oF the Director. 

79/02/09. Ip. 



7902270336 DOCKET 50-344 Trojan Nuclear Plant. Unit 1 
Forward* IE Info Notice 79-03, "Limi torque Valve Oaared 
Limit Siuftch Lubricant. " 

ENQLEKEN.fi. H. Region 3, San Francisco, OPFica of the Director. 

79/02/09. lp. 

7902310233 DOCKET 30-344 Trojan Nuclear Plant, Unit 1 
Forwards monthly operating rapt for Jan 1979. 
WITHERS, B. I). Portland Qrtleral Electric Co. 79/02/O9. lp. 



7902210224 DOCKET SO-344 Trojan Nuclear Plant. Unit 1 
Monthly operntino rept for Jan 1979. 

. 0, Portland General Electric Co. 79/02/O9. 9pp. 



7902O301 I 7O DOCKET SO-344 Trojan Nucloar Plant, Unit 1 
Forward* LER 7B-02B/03L-O. 
WITHERS, B. D. Portland OEneral Elaetric Co. 79/01/39, 



7902030193 DOCKET 90-344 Trajan Nuclear Plan.tr Unit 1 

LER 7B~028/O3L~D on 7B122B: diessl-Jr ivn auxiliary: faeduater 
pump developed dieiol fuel oil leak. Due to physical damage 
to Fitting caused by someone standing on fuaJ^linr during 
overhaul. Engine vibration caused line to break. 
PHRY. J. C. Portland General Electric Co. 79/01/2B. 2pp. 



7"?020i0307 DOCKET 50-344 Trojan Nuclear Plant. Unit 1 
Forwards LER 7B-0'S<?/O3L~Q. 
WITHERS.D.D. Portlantf QeneTal Electric Co. 79/01/39. 



2pp. 



77O226006B DOCKET 5O-344 Trojan Nucla-ar Plant. Unit 1 

Rept entitled "Containment Structure Tondan Burvei 1 lance, One 
Year Burvei 1 lance" prepared bu Bechtel for hai bean 
rsvl euEd. Add L inf-o requested re one year surveillance. 

. Operating Heactors Branch 1. 79/01/26. 3pp. 



790E060312 DDCKET 50-344 Trojan Nuclear Platit, Unit 1 
LEW 7S-Oa9/O3L-O on 7B1331 : sensing lines for two steam 
pre-Eture transnii ttars f roi e> eaus ing pressure transmitters to 
fail high. Plant will b modified to provide permanent freeie 
protect ion. 
PERRV,J.C. Portland General Electric Co. 79/01^29. lp. 



79Oai301B4 DOCKET BO-3fl4 Trojan Nuclear Plant. Unit 1 

Responds to HRC 781120 I tr reqiieEtlng addl info re proposed 
transport of crude oil by rail across eiclusion area. 
Concludes no traniport accident can adversely affect plant 
saf t^. Agreement for emergency rail control encl. 
OQDDHIW.C. Portland fleneral Electric Co, 79/O3/06. 6pp. 



7902220021 DOCKET 50-344 Trojan Nuclear Plant. Unit 1 
Forwards LER 79-001/03L-O. 
WITHERS, D. D. Portland General Electric CD. 79/O2/13, 



DOCKETED ITEMS 



89 



79022200Bi DOCKET SO-344 Trojan Nuclear Plant. Unit 1 
LER 79-001/03L-Q on 790119: operability of 135 volt DC 
electrical tys not verified per Tech Specs. Caused bij 
personnel error. 
. PERRV. J. C. Portland Oeneral Electric Cn. 79/O2/13. 



79022102S2 DOCKET 3-0-346 Davis-Dense Nuclear Power Station. Unit 1 
Forward* Amends 24.25 & 26 to In.demnitg Agreement NF-33t, 
Amends IB & 19 to Indemnity Agreement NF~92. Amend 3 to 
Indemnity Agreement En-61. & Amend 2 to Indemnity Agreement 
XB-61. W/encl end orsementft. 
LLOVD,R,D. MsrsJi & McLennan. Inc. 79/02/14. Bp p . 

7902-05030S DOCKET SO-346 Davis-Bosaa Nuclear Pnuier Station, Unit I 
In Cor mi status of & schedule For test program. The fallowing 
tests are Btill incomplete: turbine/reactor trip from 100X 
power, loss of offsitra power, unit load rejection from lOOX 
power and shutdown from outside at control mum. 
ORftNT. J. B. Toledo Edison Co. 79/OI/1O. lp. , , 

7902010103 DOCKET 30-346 Davll-Beise Nuclear Power Station, Unit 1 
Document* dicus*ion on 790116 ra 73iQS3 change to Tech Spec 
4. 3. S. b on ECC9 venting j> er i od i c I tu. Three high pressure 
Injection lines not connected to reactor coolant makeup at) s 
were vented on 790113i no air or gae noted. 
RDE. L. E. Toledo Edison Co, 79/O1/26, lp, 



77OS080247 ECCKET SO-aflfa Gavis-Besse Nuclear Power Station. Unit 1 
Forward! RD -NP-09-7B-D1. 
GRANT, J. 3, Toledo Edison Co. 79/01/12. lp. 

79O20B0250 DOCKET 50-346 Davlfl-Besse Nuclear Power Station. Unit 1 

RO-NP-09-78-O1 on 7B1215:svc water sys out header radiation 

monitor uas inoperao le. Cause* 6<j component failure due to 

design error. Personnel informed oF Environ Tech Bpocs. 
Toledo Edison Co. 76/12/15. 2pp. 



7902030101 DOCKET 9O-34(> Davis-Desse Hue 1 tar Pt 
Forwards RO NP-07-78-02. 
GRANT, J. B. Toledo Edison Co. 79/01/13. lp. 



uer Station, Unit 1 



79020BQ1S5 DOCKET 50-346 Davis-Hesse Nuclear Power Station. 
RO NP-09-73-02 on 7B1219:RE 744 condenaate derainera 1 i ter 
backwash receiving tank monitor inoperable since 7SOBI1. 
Change Request 7B-431 uaa written 7BOB1B. Mods to 
surveillance teats being prepared. 
Toledo Edison Co. 78/13/19. 2pp. 



79030-20179 DOCKET 90-3-16 Davis-Ei 
Forwards LER 7Q-I27/O3L-0. 
MURRAY,!. D, Toledo EAiion Co. 



se Nuclear Power Statii 



7902O1017B DOCKET 50-346 D-avi*-BessB Nuclear Power Station, Unit 1 
"BdU 177 Fuel As-iemtilu Ouner 'i Group Asymmetric LOCA Loads 
Evaluitlani Program. Phase 2." Evaluated contponentv Include; 
reactor preivure venelifuel assemb 1 ies. control rod drives t. 
cor* flooding piping. 
Florida Power Corp, 7S/10/10, 9pp. 



79&2O2O1B2 DOCKET 50-346 Davis-Dene Nuclear PoLi*r Statian. Unit 
LER 7a-127/O3L-O on 7B1230: asymmetric rod indication iuas 
received for Control Rod 4 of Croup Si unit was in Mode S tt 
absolute position indicator for Rod 4 wai inop-erable. Causerf 
bij dlrtij nodule contacts. 
KOWACH, B.A. Toledo Edison Co. 77/01/26. 2pp. 



7902 2i OB 2 9 DOCKET S 0-3 4 4 Dflvli-Besie Njclear Power Station. 
Ach rce/lot of 790111 Itr & technical rapt, . "Re 1 lab i 1 i tu 
Study at Davii-H*5*e Unit 1 Decay heat Removal Sys Suction 
. By pan i " fulfilling re^qo irement in canriltiun of facility 
license. Requetta Clan III fee of 4i OOO. 

Bj R. M. Licent* Fat Management Branch. 77/O2/02. lp. 



790ai3014'( DOCKET 30-346 Davl-Beiae Nuclear Pouter Btatlon, Unit 1 
Foruardi Chapters I, S, 4.8, 9. 10 & IE an revised by Suppl 3 t*f 
"InitlAl Startup Rept. Rept covers testing completed during 
7B100A-79OIO5. 
ORAMTiJ. B. Toledo Edinon Co. 79/02/Ofl. 100pp. 



7902280319 DOCKET 50-346 Davis-Bone Hue 1 tar Pouer Station, 
Responds to NfiC 7902O3 1 tr. Forwards 4j OOO check for 
Hearting feet r* 79O111 Itr Prom util. 
FIDE, L. E. Toledo Edison Co, 79/O2/22. 2pp. 



Unit 



7902020032 DOCKET 50-346 Davis-Beisa Nuclear Paufrr Stfltioilr Unit 1 
Forwards IE Insp Rept 5O-34<b/70-2B &n 7B1211-1S & notice of 
violation. Datalls withheld <ref 10CFRS.790). 
HIMD.J.A, Region 3, Chicago. BdFeguarde Branch. 79/01/50. Sfy 

7902020033 DOCKET 50-346 Davls-Desse Nuclear Power Station. Unit 1 
IE ItlHp Sept 30-346./78-HB on 791HU-15. Nancomp 1 iance noted: 
curitif organization' access cantroK ti communication, 
control. Notice of violation withheld (ref 10CFR2.790). 
HIND, J. A., HOWELL,J. C.j CREED, J. R, Region 3, Chicago. 

Safenuarde Branch. 7*tJQl/2Z. Zf'f. 

7902120113 DOCKET BO-346 Dovl-Bo Nuclfar Pouer Station. Unit 1 
Forwards IE Info iMotice 79-01. "Berjjen-PatBritm Hudraulic 
Shock h Buay ArreitOTt <H65A), 
KEPPi-ER. J, 0. Region 3j Chicaigo, Office of the Director. 79/02/ 



79D2020204 DOCKET 50-346 Daviis-Bfisse Nuclear PDUIBT Station. Unit I 
Forwards LEH 7B-126/03L-0. 
MURRAY, T.D. Toledo Ed i 9 on Cn. 77/OJ/26. lp. 

7902030210 DDCHET 30-346 Davls-DBime Nuclaar Pouer Station, Unit 1 
LER 7fl-12ii/03L-0 an 7BI E30: dur ing startup ot component 
cooling water pump, heat exchanger 1-1 svc water outlHt vatve 
BM-1424 would not open due to slippage & misalignment of 
valve 1 1 nkagei led to continuous valve oscillation. 
DEAKVME.H.. Toledo Edison Co. 79/O1/26. 3pp. 

79O3010159 DOCKET SO-346 Davis-Dcase Nuclear Poiuer Btation- Unit 1 
Foriiiarils LER 79-001/Q3L-O. 
HURRAY, T. 0. Toledo Edison Co. 79/OI/29. lp. 

79O2O1O162 DOCKET 50-346 DavlB-Besse Huclear PfluBr Station, Unit I 
LER 79-O01/03L-0 on 790102: monthly functional test not 
performed on reactor protection syi Channel 2 ullhin 
allowable time, Caused by breakdown in communications btueen 
testing personnel Si test coar-d inator, 
BORVSIAK.M. Toledo Edison Co, 79/01/29. 3pp. 

7902010169 DOCKET 50-346 Davii-Besse Nuclear Pauer Station. Unit 1 
Forwards LER 79-003/03L-0. 

, T. D. Toledo Edison Co. 79/01/29. lp. 



79Q201O17S DOCKET 30-346 Davls-DflSBe Nuclear Power Station, Unit 1 
LER 79-OO2/03L-0 on 790102; mni l> stream valves 1O6 & lOis 
failed to open due to puildup oP dirt an valve sterna. Dirt 
buildup result of recent const activities. 
Q'WEILL.J. Toledo Edison Co. 79/01/29, 3PP. 

790214OI7O DOCKET SO-346 Davis-Be-sse Nuclear Pomer Btation* Unit 1 
Forwards RO NP-09-79-01. 
ORANTjJ. S, Toledo Edison Co, 77/01/30, lp, 



790S21O1B1 DOCKET 30-346 Davl*-Bese Nuclear Power Station, Unit 1 
Forwards IE Bulletin 79-O1, ''Environ Quallflcatior of Clais 
IE Equipment." W/llt of 11 systematic evaluation program 
plants for which no action ia required. 

KEPPLER, J. 0, Region 3, Chicago. Office of the Director. 79/03/09. 

lp. 

790B27Q363 DOCKET BO-346 DavK-Gesse Nuclear Pouer Btatlo-n, Unit 1 
Forwards IE Info Notice 79-03, "Limi tDrq.u Valve Oeared 
Limit Switch Lubricant." 
KEPPLER.d.O. Region 3, Chicaoo. Office of the Director. 79/O2/09. 



7902130271 DOCKET 5O-346 Davi-ae*se Kuclear Power Station, 
FoTuiards monthly operating rspfc for Jan t979. 
MURBAY. T. D. Toledo Edison Co. 79/O2/09. lp. 



Unit 1 



7903H0174 DOCKET SO-34& Davis-Besae Nuclear Pouer Station, Unit I 
RO NP-07~79-flk:HE 20E4 !. RE 2023,statlon ventilation 
radiation monk tors, were inoperable. Cau led bij component 
Failure. 
Toledo Edison Co. 79/O1/OB. 2pp. 

79O20&023B DOCKET SO-346 Davis-Beia-e Nuclear Pouur Station, Unit 1 
ForwarflB LER 79-007/O3L-0. 
MURRAY. T. D, Tnleoo Edison Co. 79/01/3!. lp. 

79020&DB4H DOCKET 50-3^16 Davis-Hesse Nuclear Pouer Station, Unit 1 
UEfl 79-007/03U-0 on 7901 10: dur ing performance of 
surveillancfl te-at. Channel S of containment Jiijdrogen analgier 
was found Inoperable. Caused bg defective lener diods in 
millivolt converter. 
HITCHEKS.D. Toledo Edison Co. 79/01/31. -3pp. 



79O213029S DOCKET 50-346 Davis-Dpss* Nuclear Pouer Station. 
Monthly operating rept for Jan 1979. 
CADA. E, C. Toledo Edison Co. 79/O2/09. 14pp. 



7903060263 DOCKET SO-346 Davi*-De*se Nuclear Poue-r Station. Unit 1 
Forward* LER 79-OO6/O3L-0. 
MURRAYfT.C, Toledo Edison Co. 79/01/31. lp, 



90 



DOCKETED ITEMS 



7902060269 POCKET 50-316 Davis-Busse Nuclear Pouier Station. Unit 1 
LER 79-OQ6/03L-0 on 79010S: noted 7B12HB deficiency re 
continuous alarm of contact data logger point FOIS. Fir* 
detector uiai not declared inoperab le. Cauied by indicating 
lights failure. Survelllano teit modified to add lamp test. 
CHESKO, R. Toledo EdUon Co. 79/01/31. 3PP- 

79020'60333 DOCKET 30-316 Davit-Seise Nut 1 Mr Power Station, Unit 1 
Forward* LER 79-004 /03L-0. 
MURRAY.T.D. Toledo Ediion Co. 79/01/31. lp- 

7902060338 CDCKET 30-346 Davis-Bests Nuclear Pouier Station, Unit 1 
LEU 7-?-uQfl/03L-0 on 7901O5: fai lure to poit fluards at 
entrance to containment during jierindi of free access. 
Failure due to personnel error. 
GREENE. H. Toledo Editun CP. 77/01/31. 3PP. 

7903060330 DOCKET 90-346 Davit-Basse Nuclear Power Station, Unit 1 
Foruard-B LER 79-003/03L-0. 
HUWMV.T. D. Toledo EH ton Co. 79/01/31. tp. 

7902060333 DOCKET 50-346 Davi-Besle Nuclear Pouer Station, Unit 1 
LED 79-003/03L-O on 790104: control room emergency 
ventilation tyt damper HV3311E inoparabla. Caused bij leaking 
pneumatic operator. 
RUDDI.PH, J. Toledo Ediion Co. 79/01/31. 2pp. 



79021S03B9 DOCKET 30-346 Davia-BesBB Nuclear Power Station. Unit 1, 
LER 79-011/03L-0 on 79011 3: reactor coolant pump 1-2-2 
started w/incoTrect breaker al ionment, causing lou voltage 
relay* to trip b de-energ i i ing both 4.16 fcV essential buses 
Ci b Dl. Cause wai personnel error. 
MARLEY.J. Toledo Edison Co. 79/02/09. 3PP. 

7902200016 DOCKET 30-346 Davls-Bosse Nuclear Powar Station, Unit 1 
Forwards LER 79-01 3/03L-0. 
HURRAY, T. D. Toledo Edison Co. 79/02/12. lp. 

7902200017 DOCKET 30-346 Davis-Besse Nuclear Power Station. Unit 1 
LER 79-013/03L-0 on 790117; core floodinfl tank 1-S isolation 
valve CF1A motor operator would not closa during shutdown. 
Caused bu component failure due to loose set screw. 
0'NEILL,J. Toledo Edison Co. 79/02/12. 3pp. 



7902200020 DOCKET 30-346 Davls-Besse Nuclear Power Station, 
Foruiards LER 79-014/03L-0. 
MURRAY.T.D. Toledo Edison Co. 79/02/12. lp. 



Unit 1 



790220002H DOCKET 30-346 Davis-Basse Nuclear Power Station, Unit 1 
LEO 79-014/03L-0 on 790116: total vol in boric acid addition 
tanks (BAAT) was found at 3-1/3X below Tech Spec 
requirements. Caused by reduced BAAT vol "fter completion of 
reouirad testing, fol lowad by Deration of RCS. 
MARLEY.J. Toledo Edison Co. 79/02/12. 3pp. 



790B0603BQ DOCKET 50-346 Davi-Det*e Nuclear Power Statiom Unit 1 
Forwards LER 79-OOD/03L-0. 
HURRAY. T.D. Toledo Edison Co. 79/01/31. lp. 

7902060393 DOCKET 80-346 Davis-Seise Nuclear Power Station, Unit 1 
LER 79-OQS/03L-O on 790106: during surveillance tasting* 
boratei) uater storage tank level bistable was tripped) valves 
DH9A opened & DH7A c losed. Caused by component failure of 
output relay K31A Si instrument drift. 
NELSON, J. Toledo Edison Co. 79/01/31. 3pp. 



7902200028 DOCKET BO-346 Davis-Besia Nuclear Power Btntion. 
Forwards LER 79-012/03L-0. 
MUSRftY.T.D, Tolado Edison Co. 79/02/12. lp. 



Unit 1 



7902200030 DOCKET 30-346 Davii-Be>e Nuclear Power Station, Unit 1 
LER 79-012/03L-0 on 790HA: durlnp, surveillance ttstinfl, h*at 
traetd line temp measurement points were below 103 F lj mlt - 
Caused by injection of makeup water after boron injection at 
temp lower than 103 F. 
ALH.C.N. Toledo Edison Co. 79/02/12. 2pp. 



7902060IB4 DOCKET 3O-346 Davi-Besse Nuclear Powar Station, Unit 1 
Forwards RQ NP-09-79-02. 
ORAMTjJ.B. Toltdo Edison Co. 79/02/01. lp. 



7902210230 DOCKET 80-346 Davis-Basse Nuclea 
Forwards LER 79-013/03L-0. 
MURRAY, T. D. Tolndo Edison. Co. 79/03/12. 



Power Station, Unit 1 
lp. 



790-2060193 DOCKET 50-346 DavU-Bmsa Nuclear Pouer Station, Unit 1 
SO NP-09-79-02 on 790104: RE 3432, svc water sys header 
outflow radiation monitor, was Inoperable due to component 
deficiency resulting from design error. 
Toledo Edison Co. 79/02/01. lp. 

7902120128 DOCKET 80-346 Davis-Besse Nuclear Power Station, . Unit 1 
Forward* LEU 79-008/03L-0, 
MURRAY. T. D. Toledo Edison Co. 79/02/03. lp. 

7902120.131 DOCKET 50-346 Davis-Besse Nuclear Power Station, Unit 1 
LEH 79-008/031.-0 on 790109: during surveillance tasting, 
containment rtclrculatlon fan 1-1 failed to run. Cause 
attributed to buildup of non-conductive film on auxiliary 
controller contacts. 
NAYLOR.R. Toledo Edison Co. 79/02/03. BPP. 

790H130333 DOCKET 30-346 Davis-Basse Nuclear Power Station, Unit 1 
Forwards LEF1 79-01O/03L-0. 
HURRAY. T. D. Toledo Edison Co. 79/02/09. lp. 

7902130336 DOCKET 50-346 Davls-Btsse Nuclear Pouer Station. Unit 1 
LER 79-010/03L-0 on 790112: Bys 7 data longer eiperieneed 
"core dump" which voided computer's memory benk.miking 
remote monitoring of fire detection sys inoperable. Cause 
unknown. 
KOCIS,R.. KOVACH.S. Toledo Edison Co. 79/02/09. 2pp. 

7902130370 DPCKET 30-346 Davls-Besit Nuclear Power Station, Unit I 
Forwards LES 79-O09/03L-Q. 
HURRAY, T. D. Toledo Edison Co. 79/02/09. lp. 

790B1303B2 DOCKET 50-346 Davis-Hesse Nuclear Pouer Station. Unit 1 
LER 79-009V03L-0 on 790112: power to vital bus Y2 lost. 
False Integrated control sys signal resulted In reactor It 
full steam fc feadwater rupture control sy* trip. Caused by 
blc-un 1?3 volt DC fuse to inverter. 
LIMOENFELTER. J. Toledo Edison Co. 79/02/OB.' 3pp. 

7902130383 DOCKET 90-346 DavH-Besss Nuclear Power Station. Unit 1 
Forwards LER 79-01 1/03L-0. 
MURRAY* T. D. Toledo Edison Co. 79/02/09. lp. 



7902210234 DOCKET 3O-346 Davis-Besse Nuclear Power Station, 
LER 79-013/03L-0 on 7901 16: when makeup pump 1 was started 
for surveillance test, a 1/2 Inch nipple at discharge of 
attached gear-driven lube oil pomp failed h resulting oil 
spray required pump shutdown. Caused by piping vibration. 
ADAMB.J. Toledo Edison Co. 79/02/12. 2pp. 



Unit 1 



7902270259 DOCKET 30-346 Davit-Bess! Nuclei 
Forwards RO NP-33-77-64. 
MURRAY, T, D. Toledo Edison Co. 79/02/HO. 



ir Pouer Station, Unit 1 
lp. 



7902270S60 DOCKET 50-346 Davis-Bet Nuclear Power Station. Unit 1 
LER NP-33-77-64 on 770BB7: reactor coolant pump 1-1-2 
tripped, removing one of two reactor coolant pups from 
operation. Caustd by damage to surge capacitors due to 
insufficient mounting base. ,,,.-, 

L1NOENFELTER. J. . BEEUER.T. Toledo Edison Co. 77/09/22. 



2pp. 



7902270407 DOCKET 30-346 Davis-Besse Nuclear Pouer Station 
Forward* LER 79-016/03L-0. 
MURRAY,T.D. Toledo Edison Co. 79/02/20. lp. 



Unit 1 



7902270412 DOCKET 30-346 Davis-Basse Nuc)ar Power Station- Unit 
LER 79-016/03L-0 on 790124: emergency lock railed leafc rate 
test while unit in Mode 3. Caused bij loosening af shaft seal 
{teflon packing) due to routine USB of escape lock. Paemng 
will be replaced during next convenient outage. 
BROWN.R.A. Toledo Edison Co. 79/02/20, 2PP. 



7902220119 DOCKET 50-348 Joseph M. Farley NueUar Plant, Unit 1 
informs that TRADOC Pamphlet 330-30, "I"*' r "7j" ''l"'^"* 
for Instructional 9u Development 11 referenced in NURW-0319 
is available in microfiche form from NRC. ,.,.,. - 
BESAW. H, J. Division of Document Control. 79/01/09. app. 

7902280244 DOCKET 50-348 Joseph M. Farley Nuclear Plant, Unit 1 
Forwards attachment* detailing reasons for delay* in 
implementing 10CFR73. 33 requirements I- compensatory 
rfeasurei.Encl withheld (ref ""'"' , 
CLAYTON, F, L. Alabama Power Co. 79/02/20. lp. 



7902120176 DOCKET 50-348 Joseph M. F.rl.y MlM.--Uf.t. 
Forwards Endorsement 2E- to NELIA Polieu W'-ZX. 
FIELDER, J. Harsh b McLtnnan, Inc. 79/OB/OA. 2pp. 



Unit 1 



DOCKETED ITEMS 



7902860302 DOCKET 90-348 Joseph M, Farley Nut leer Plant, Unit 1 
Forwards Endorsement 17 to NELIA Policy HF-93. 
DUCK. J. R. Marsh t, McLennan, Inc. 79/02/19. Hpp 



7902210236 DOCKET 50-34B Joseph M. Farley Nuclear Plant, 
ForumriJa monthly operating rept fnr Jan 1979. 
CLAYTON, F.L, Alabama Power Co. 79/02/11. Ip. 



7902090031 DOCKET 50-348 Joieph M. Farley Nuclear Plant, Unit 1 
Inform! that Board will hear argument on 790239 re 
gicaptloni filed by all part IDS. Encourages parties to 
consolidate argument*. 

DUFLO, M. E. Atomic SaPety and Licensing Appeal Panel. 79/01/23. 
2pp. 

7902270403 DOCKET 50-348 Joseph M, Farley Nuclear- Plant. Unit 1 
Notification that author mill argue on behalf of Nile. 
AXELRAD.J.A. Regulation* Division 79/01/30. Ip. 

7902230101 DOCKET 30-349 Joieph M. Farley Nuclear Plant. Unit 1 
Moves that or*l argument be continued until 79030B.due to 
a^ty's Involvement in Congressional study, Cert i Meats of Svc 
encl. 

AXELRAD. J. A. Office at the Executive Legal Director, 79/02/D1. 
4pp. 

7902260164 DOCKET 90-348 Joseph M. Farley Nuclear Plant. Unit 1 
Order* rescheduling of oral argument to 79030B in 
Bethesda.MD. 
DUFLD, M. E. Atomic Safety and Licensing Appeal Panel. 79/02/O3. Ip, 



79022S03B9 DOCKET 30-34B Joseph M. For ley Nuclear Plant, Unit 1 
As Pollauup to NRC 7B1113 request fgr suhmittal of DPfsite 
Do*t Calculation Manual For approval, forwards guidelines for 
general contents at manual. 

CRIMES, B. K. Assistant Director For Engineers fe Projects 

79/01/1B. 3pp. 

790213Q19B DOCKET 90-34B Joseph M. Farley Nuclear Plant, Unit 1 
Respond* to NRC 7B1 1EB Itr re containment purging during 
normal plant operation. Forwards justification for limitei 
purging via IB-inch mini-purge .valves in response to Branch 
Technical Poiitlon CSD 6-4. 
CLAYTON, F.L, Alabama Power Co. 79/02/05. 12pp. 



7902310237 &OCKET 30-34FJ Joseph M. Farloy Nuclear Plant, Unit I 
Monthly operating rapt For Jan i 979. 
* Alaoama Powr Co. 77/O2/14. Hpp. 

7902060300 DOCKET 50-343 Joseph H. Parley Nuclear Plant, Unit I 
Forwards LER 79-001/O3L-O. 
CLAYTON, F. L. Alabama Power Co. 79/02/01. Ip. 

79020t0304 DOCKET 3O-34B Joseph M. Farley Nuclear Plant, Unit 1 
LGR 79-001/Q3L-0 on 790109: e 1 ec tron ic twitching 141 DIG 
sequencer failed to meet time requirements for picking up 
Step 2. Caused by agaatat timer aetpoint if rift 
HftlRSTON.H, 0. Alabama Power Co, 79/OE/01. Ip. 

7902310227 DOCKET SO-34B Joseph M. FarUu Nuclear Plant, Unit 1 
Forwards LER 79-OO2/03L-0 i 79-O03/O3L-0. 
CLAYTON, F. L. Alabama Pouier Co. 79/OH/I3. Ip. 



7903210330 DOCKET 50-34B Joseph M. Farley Nuclear Plant, Unit 1 
LEfi 79-002/03L-0 on 790116: 12QV vital AC bus IB uaa 
deenflrglied uihen Inverter IE tripped due to components 
Pai lure. Capac i tor. a Ir core chafee, rosi a tor l> FUBB were 
replaced ti inverter re turned to svc. 
HAIRBTON. U. 0. Alabama Power Co. 79/02/13. Ip. 

7902310233 DOCKET 5O-34B OnsBph M. Farley Nucloar Plant, Unit 1 
LER 79-003/03L-0 on 79O 1 1 6: f p-llnul ng reactor trlp.turfilne 
driven auilllary fvcduiater pump failed fen i tart. Caused by 
trlp/thrott lo valvo which tripped shut, 
HAIRBTQN, W. 0. Alabama Pouier Co. 79/O2/13. Ip. 

79QSB70212 DOCKET -30-3-ia Joseph M. Farley Nuclojir Plnnt, Unit 1 
Forwards LERs 79-001/O3L-O, 79-C-03/03L-0 tt 79-006/03L-0. 
CLAYTON, F.L. Alabama Pouar Co. 79/O2/H1. Ip. 



7902830129 DOCKET 30-34B Joseph M. Farley Nuclear Plant, Unit 1 
Forwards IE Insp Rept SO~34B/7S-33 on 781219-83. No 
noncompl iance noted. 

LONO.F.J. Region S, Atlanta, Rnactor OperationB Nuclear Support 

Branch. 79/01/11. 2pp. * Y 

7902230133 DOCKET BO-34B Joesph M. Farley Nuclear Plant, Unit I 
IE Insp Rept DO-34B/7B-3S on 7Biai9-22.No noncompl iance 
noted. Major areas inapacted: calibr program. 

DUZTB.J.E., KELLOOO.P.J. Region 2, Atlanta, Reactor Dperatlona 

Nucloar Support Branch. 79/01/11. 7pp, 

7902SBOOOB DOCKET 30-34B Joseph M. Farley Nuclear Plant, Unit 1 
Corrects 7901B2 Itr.Lamt line of paragraph 1 ihould read: 
"We mill examine your corrective actions & plans during 
subsequent inspection*. " 

LEWIS.R.C. fieoion S, Atlanta, Reactor DperafaJDtvs Nuclear Buppnrt 

Branch, 79/OL/30. Epp. 

7902230037 DQCKEIT SO-348 Joieph M. Farley Nuclear Plant- Unit 1 
Ack receipt of IE Insp Rept 90-34S/7B-3S on 790111. No 
proprietary info. 
CLAYTON, F.L. Alabama Pouer Co. 79/02/03. Ip. 

79022S0459 DOCKET 30-34B Joseph M. Fnrleu, Nuclear Plant, Unit 1 
Forwards IE Info Notice 79-O1, "Bsroen-Patwrson Hudraullc 
Shock !< Suiay Arresters (HSSA)." 

O^RElLLY, J.P. Region 2, Atlanta, Office of the Director 

79/OS/Oa. 3pp. 



79023B001I DOCKET 30-34B Joseph M. Farley NucUar Plant, Unit 1 
Forward* IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment. " 

O'HEILLY, J.P. Region 2, Atlanta, Office of the Dlraetor 

79/02/03. 6pp. 

7902210170 DOCKET 5O-34S Joseph M. Farley Nuclear Plant, Unit 1 
Forwards IE Bulletin 79-01- "Environ Qi-nllf icatlon of Class 
IE Equipment." H/list of 11 systematic evaluation program 
plants For which no action is required. 
79/OH/OS 1 J 'a' Re 9'n 2, Atlanta, Office of the Director. 

79022B0041 DOCKET 50-34B Joseph M, Farloy Nuclear Plant, Unit 1 
Forwards IE Info Notice 79-03, "LimI torque Valve Geared 
Limit Switch Lubricant. " 
79/02/09' J " 2' Re !" Dn s ' Atlanta, OFFlce oF the Director. 



7902B7O2-14 DOCKET SO-34H JdflBph M. Parlay Nucloar Plant, Unit 1 
LER 79-004/O3L-0 on 79O123: contalnmont atmosphere 
partitulate radioactivity monitoring lyg. inoporabl ei 1 1 1 tor 
paper was not advanc i ng. Caused by rap 1 ac ament papnr bo Ing 
thicker that that originally luppliod. 
HAIRBTON, W. 0. Alabama Pouier Cn. 79/OS/21. Ip. 

790227OH19 DOCKET 3O-3^B Joseph , FarUy Muclo-nr Plant. Unit 1 
LER 79-OOB/03L-0 on 790123: dur 1 ng >urvel)lanca tint on boron 
injection tank Inlet valve 01 E32VO1 6B, va I vn failed to 
operate electrical S ij. Cause und ttteTinl nod , sintn subsequent 
troubleshooting Failed to duplicate proh lorn. 
HAIRBTON, w, O. Alabama Pouor Co, 79/02/21. Ip. 

7902270223 DOCKET S0-34a Joseph M. Farley Nuclear Plant, Unit 1 
LER 79-006/O3L-0 on 79O123: flur 1 ng moint an bnron Injection 
tank inlet valve QIE21VD16D. boron t oncontrntion fell below 
Tech Spec requirements., Caussd by leadaen through opnnoit 
valvs during troubleihoot ing per LER 79-OIJ5/03L-0. 
HAIRBTON, U. 0. Alabama Power Co. 79/O2/SI, 3pp. 

79O3280277 DOCKET 90-31B Joseph M. Farley Nuclear Plant, Uni b 1 
Forwards LER. 7a-O3B/O3X-S, 70-066 /03X-2 t> 7B-079/O1 1-1 , 
CLAYTON, F.L. Alabama Pouier Co. 79/OS/22. Ip. 



79022Q0292 DOCKET SO-34H Joseph M, Farley Nuclear Plant, Unit 1 
LGR 7a-038/03X-S on 7B0327: temp average dropped belou B41 F 
Caused by llftlno of code safety valve 
HAIRSTON.W. 0. Alabama Powsr Co. 79/02/22. 3pp. 

79022B0303 DOCKET 90-34BJo r[J hH. Farlog Nu C l ea r PUnt, Unit 1 
LER 7B-079/OIX-I on 7B1 1 14 : tuater vo 1 umo In Firo protection 
sys uiater storage tank 1 H * 9 than Tech Spec mln. Caused I.D 
failure to coordinate const activities Lj/onorat ions 
personnel 
HAIRHTON. W. B. Alabama Pouiflr Co. 79/O2/2S, 3pp. 



DDCKET 50-340 Joseph M. Fsrleu Nuclear Plant, Unit 1 
LER 7B-066/03X-3 on 7B0911: d 1 e.e 1 senator air *tart ay* 
air reaervoirs 1A t ID pressures uero 210 plg A HO mig 
Caused b laallnj D p IB air compressor rellof valve/thectr 

HAIRBTON, H. Q. Alabama Power Co. 77/02/82. 3pn, 

7902080390 DOCKET SO-352 Lifner ic k eeneratlno Station, Unit 1 
NDtiflcabVon of 790213-M meeting u /narK II oum*r* group bo 

fc * af y rell P Vfllve ' oal -Wniii IO^B. P 

Cantalnmont Sijstemt Drancli. 79/01/S4, 3pp. 



92 

79Q209O343 DOCKET 50-352 Limerick Generating Station, Unit 
Forwards GE topical rept NEDD-34010-a. Supp 1 2, "Bases for 
Criteria for Combination of Earthquake !. Other Transient 
Responses by the Square-Root-Sum-Of-The-Squai-es Method. 
Rept Ls provided on behalf of Mark 2 owner's group. 
SOBOM.L.J. General Electric Co. .Nuclear Energy Prnducts 
79/02/03. lp. 



DOCKETED ITEMS 



Div, 



erick Generating Station. Unit 1 
a far Combination of Earthquake 
By the Square-Rout-Bum-of-the- 
method for combining multiple 
blasts & earthquakes. 

KENNEDY. R. P. , NEWMARK. H. M. . ENGLISH. U. F. General Electric 
Co. .Nuclear Energy Products Div. NEDO-24010-2. 70/12/31, 



7902090367 DOCKET 50-352 Li 
Buppl 2 "Basis for Criter 
Other Transient Responses 
Squares Method. " Discusse 
peak dynamic respon 



30pp. 



7902230061 DOCKET 50-332 Limerick Generating Station, Unit 1 
Informs that TRADCC Pamphlet 350-30, " Interservice Procedures 
for Instructional Sys Development" referenced in NUREQ-0219 
is available in microfiche form from MRC. 
BE5AW.U. J Division of Document Control. 7B/ll/aO. 3pp. 

7902230163 DOCKET 50-353 Limarlci Generating Station. Unit 1 
Forwards IE Imp Rents 50-332/79-10 i. 50-333/7B-Q6 nn 
7B1127-1201 t< 1206 No noncompliance noted. 

CARLSON, R. t. Region 1. Philadelphia, Reactor Construction it 

Engineering Support Branch. 79/01/O9. 2pp. 

7902B3017D DOCKET 50-332 Limerick Generating Station, Unit 1 
IE Insp Repts 50-352/7B-IO !. 50-353/7B-06 on 7B1127-I201 t 
12O6.ND nonccmpliance noted. Areas inspec ted: mor k activities 
!. records for saf etg-related pipe supports 8. restraints, fue 1 
pool girder. preservice Insp d plant tour insp. 

MATT I A, J. , FflSANO.A., MCGAUGHV, R, Region 1. Philadelphia, 

Reactor Construction & Engineering Support Branch. 79/OI/OS. 
13pp. 

7902050073 DOCKET 30-332 Limerick Generating Station, Unit 1 
Ack receipt of 7B1227 Itr informing NRC of steps taken to 
correct violations noted in IE Insp Repts 50-352/7B-09 t. 
30-333/78-05. 

CARLSDN.R. T. Region t. Philadelphia, Reactor Construction tt 

Engineering Support Branch. 79/01/12. lp, 

79Q303007B DOCKET 30-352 Limerick Generating Station, Unit 1 
Responds to NBC 7B1121 1 tr re violations noted in IE Insp 
REpts 90-352/7B-09 t 50-353/7B-05, Correct ive actions: 
protection d storage of equipmentiQC documentation 
implemented re verification ot concrete strengths. 
BQYEH.v.S. Philadelphia Electric Co. 7B/12/27. 5pp. 

79030,50080 DOCKET 5D-332 Limerick Generating Station, Unit 1 
Forwards IE Insp Repts 50-352/78-09 k 50-35D/7B-05 nn 
7B1017-19 t notice of violation. 

CARLSON. R. T. Region 1. Philadelphia, Reactor Construction !< 

Engineering Support Branch. 78/11/91. 2pp. 



7902050082 DOCKET 50-353 Limerick Generating Station. Unit 1 
Notice of violation from insp on 781017-19. 

Region 1, Philadelphia, Office of the Director. 78/11/16. 
3pp. 

7903050083 DOCKET 30-332 Limericfc Generating Station. Unit 1 
IE Insp Repts 50-352/7B-09 t. 50-353/7B-05 on 7B1017-19. 
Nnncnmpliance noted: fai lure tn follow procedures for storage 
!< maint of HPC1 h tore isolation cooling turbines, or to 
verify concrete strength prior to support removal. 
MATTIA. J. , CERNE.A., MCGAUGHV. R. Region 1. Philadelphia, 

Reactor Construction d Engineering Support Branch. 7B/11/16. 
10pp. 

7902010269- DOCKET 50-332 Limerick Generating Station. Unit i 
Forwards IE Circular 79-02, "Failure of 120 Volt Vital AC 
Power Supplies. " 

GRIER.Q.H. Region 1, Philadelphia. Office of the Director. 

Bpp. 



7702130035 DOCKET 30-352 Limerlc* Generating Station, Unit 1 
Forwards. IE Info Notice 79-01, "Bergen-Paterson Hydraulic 
Shock fc Buiay Arresters (HSSA). " 

GRIER.a.H, Region 1. Philadelphia, Office of the Director. 

79/02/02. lp. 

7902230195 DOCKET 80-352 Limerick Generating Station, Unit 1 
Forwards IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment." U/lisl of II systematic evaluation program 
plants For which no action is required. 

GRIER.B, H. Region 1, Philadelphia, Office of the Director. 

79/02/08. IP. 



30pp. 



79Q2QB0290 DOCKET 50-353 Limerick Generating Station, Unit 3 
Announces 790213-14 meeting u/Mark II oumer. group to 
discuss LOCA b safety relief valve pool dynamic !" 
ANDERSON-C. J. Containment Systems Branch. 79/0 1 /..I. Spp. 

7902090343 DOCKET 50-353 Limeric* Generating Station, Unit 2 
Forwards BE toplc.f rept NEDD-24010-2, Supp 1 2, "Base, for 
Criteria for Combination of Earthquake b Other Tran.ient 
Responses by the Square-Root-Sum-Of-The-aquore. Method, 
Rept is provided on behalf of Mark 2 owner's group. 
SDBDN.L.J. General Electric Co., Nuclear Energy Product. Div. 
79/02/05. lp. 

7903090367 DOCKET 5O-353 Limerick Generating Station, Unit 2 
SuDol 2 "Basis for Criteria for Combination of Earthquake & 
Other Transient Responses By the Square-Root-Sun-of-the- 
Squares Method." Discusses method for combining multiple 
P.ak dynamic responses for blasts t. earthquakes. 
KENNEDY, R. P.. NEWMARK, N. M. , ENGLISH. W. F. General Electric 
Co. .Nuclear Energy Products Div. NEDO-24O10-2. 7B/12/31. 

7902230061 DOCKET 3O-353 Limerick Generating Station, Unit 3 
Informs that TRADOC Pamphlet 350-30. " Inters.rvice P"^" 
for Instructional Sys Development" referenced in NUHEQ-twiv 
is available in microficha form from NRC. _,..,_ - 

BESAH.W. J. Division of Document Control. 7B/ll/att. Jpp. 



7902230163 DOCKET 50-353 Limerick Generating Station, Unit 3 
Forwards IE Insp Repts 50-33H/78-10 !< 30-353/7B-06 on 
781127-1201 . 1206. No noncompl iance noted. 

CARLSON.R.T. Region 1, Philadelphia, Reactor Construction (. 

Engineering Support Branch. 79/01/09. 2pp. 

7902230170 DOCKET 50-353 Limerick Generating Station, Unit 2 
IE Insp Repts SO-352/7B-1Q & 50-333/7B-06 on 7B1127-1801 & 
1206. No noncompliance noted. Areas inspected; work activities 
t, records for safety-related pipe supports * restraints, fuel 
pool girderi preservice insp & plant tour insp. 
MATTIA.J., FA9ANO.A.. MCGAUQHY. R. Region 1, Philadelphia, 

Reactor Construction Si Engineering Support Branch. 7v/Ol/OB. 
15pp. 

7902050075 'DOCKET 30-333 Limerick Generating Station, Unit 2 
Ack receipt of 7B1227 Itr informing NRC of steps taken to 
correct violations noted in'lE Inp FlepU 30-332/78-09 & 
SO-333/7B-05. 

CARLSON, R. T. Region lj Philadelphia, Reactor Construction tc 

Engineering Support Branch. 79/01/18. lp, 

79O2O3007B DOCKET 50-333 Limerick Oeneratina Station, Unit 2 
Responds to NRC 781121 Itr re violations noted in IE Insp 
Repts 50-352/78-09 & 50-393/7B-OS. Correc ti VH actions: 
protection & storage of equipment! QC documentation 
implemented re verification of concrete strengths. 
HOVER, V. S. Philadelphia Electric Co. 7B/12/27. 5pp. 



79020500BO DOCKET 50-333 Limerick Generating Station, Unit E 
Forwards IE Insp Repts SO-352/7B-09 5, 5O-333/7B-05 on 
7B1017-19 & notice of violation. 

CARLSON, R. T. Region 1, Philadelphia, Reactor Construction EC 

Engineering Support Branch. 7B/11/21. 2pp. 



7902090032 DOCKET 50-333 Limerick Generating Station, 
Notice of violation from inap on 7B1017-19. 
Region 1, Philadelphia, Office of the Director. 

3pp. 



Unit 2 



78/11/li. 



79020500B3 DOCKET 30-353 Limerick Generating Station, Unit 2 
IE Insp Repts 3O-332/7B-09 & 30-353/7B-05 on 7B1O17-19. 
Noncompliance noted : fai lure to follou procedures for storage 
& maint of HPCI & core isolation coaling turbines, or to 
verify concrete strength prior to support removal. 
MATTIA.J., CERNE, A. , MCGAUGHV.R. Region 1, Philadelphia, 

Reactor Construction * Engineering Support Branch. 7B/11/16. 
10pp. 

7902010269 DOCKET 30-353 Limerick Generating Station, Unit 2 
Forwards IE Circular 79-02, "Failure of 120 Volt Vital AC 
Pouer Bupp 1 iea. " 

GRIER.D.H. Region 1, Philadelphia, Office of the Director. 

79/01/16. Spp. 

7902130035 DOCKET 30-353 Limerick Generating Station. Unit 2 
Forwards IE Info Notice 79-01, "Qergen-Paterson Hydraulic 
Shock k Suay Arresters (HSSA). " 

GRIER.B.H. Region 1, Philadelphia, Office of the Director. 

79/02/02. lp. 



DOCKETED ITEMS 



93 



79022B0499 DOCKET 30-333 Limerick Qeneratina Station, Unit 2 
Foruiardl -IE Bulletin 79-O1, "Environ Qualification of Class 
IE Equipment." H/list of 11 systematic evaluation program 
plants far which no action Is required. 

.DRIER. 8. H. Region 1, Philadelphia, Office nf the Director 

79/O2/OB. IP. 



7902220257 DOCKET 30-354 Hope Creek Nuclear Station, Unit 1 
Responds to 79O111 request for review of paper "Vent 
Clearing During Simulated LQCA in a Mark I DUB 
Pressure-Suppression Sys. " Recommends paper be accepted for 
pub lication 
GRIMES, C. Plant Systems Branch. 79/Q1/31. 2pp. 



790B090236 DOCKET 3O-334 Hope Creek Nuclear Station, Unit 1 
Request! authorization to use certain components in 
facilities designed to codes other than those specified in 
subsections (c) through (ft of 10CFRSO. 53a. 

MITTL.R.L. Public Bat-vice Electric Si Oas Co. of New Jersey, 
79/01/30. 3pp. 



7702080153 DOCKET SO- 354 Hnpe Creek Nuclear Station, Unit 1 
Forwards IE Insp Rept 50-394/7B-14 on 781 130-30. No 
none amp liance noted. 

CARL80N.fi. T. Region 1, Philadelphia. Reactor Construction fc 

Engineering Support Branch 76/12/26. 2pp. 



79022B014E DOCKET 50-354 Hope Creek Nuclear Station, Unit 1 
Forward* Amend 9 to Const Permits CPPR-120 & CPPR-121,por 
ABLAB 790112 dec i B ion. Notice of issuance encl, 
BDYD. R. B. Otflet of Nuclear fleactor Regulation. 79/02/01. 4pp. 

79022B0130 DOCKET 50-354 Hope Creek Nuclear Station, Unit 1 
Amnd 5 to Const Permits CPPR-120 & CPPR-121 adds condition* 
to eniurt that NRC uiill be promptly alerted of passible 
traffic increase of liquefied natural gas or liquefied 
pitrol Bum gat 
BQYD.R.B. Division of Project Management. 79/02/O1. 4pp. 

79022B0157 DOCKET 50-354 Hope Creek Nuclear Station, Unit 1 
Notice of issuance of Amend 5 to Const Permits CPPH-12O & 
CPPR-131. 
BAER.R. L. Light Water Reactors Branch 3. 79/02/01. 2pp. 

77020B0195 DOCKET 50-354 Hope Creek Nuclear Station. Unit 1 
Submit 1 Due I77B program activity rev! eiu. comprised of info 
from selected lections of monthly rep t, y/aection on contract 
b billing status removed. List* meeting* held t* provides 
ta*k-bu.-tal! activity summary. 

BDBON. L. J. General Electric Co., Nuclear Energy Product* Div. 
79/02/03. 10pp. 

7902370317 DOCKET 50-354 Hope Creek Nuclear 1 Station. Unit 1 
Forward* 790119 press release by Federal Energy Flegulatory 
Commission re rejection of Tenneco LNO. Inc. application to 
build liquified natural gas terminal at Heat Deptford.NJ. 
CONNOR, T. H. Conner, Moore & Corber. 79/01/22. Ip. 

7902260102 DOCKET 50-354 Hope Creek Nucloar Station, Unit 1 
Forwards A SI AD 790112 decision & ASLB second suppl Initial 
decliion of 780413. both re probability of postulated 
flammable gas cloud accidents from liquefied natural gas 
tankers which could affect facility. 
BALLARD, R. L. Environmental Project Branch 1. 79/02/01, 4pp. 

7902260106 DOCKET 50-354 Hope Creek Nuclear Station. Unit 1 
Decision dtd 790112 (ALAB-SlBt concludes that flammable 
vapor cloud accident is so unlikely that its environ impact 
need not be considered. 

DUFLD, M. E. Atomic Safety and Licensing Appeal Panel, 79/01/12. 
97pp. 



79020B0155 DOCKET 50-354 Hope Creek Nuclear Station, Unit 1 
IE Insp Root 50-354/7B-14 on 701126-30. No noncompl ianc B 
noted. Major areas inspected: QC programs for installation of 
piping !< erection of structural steeliujeld mat] control i uield 
radiographs. 

NARROW,!.., BANDERB,H. F. , MCOAUOHY, R. W. Region I, Ph i ladelpfi ia. 

Reactor Construction t> Engineering Support Branch. 79/12/93, 9pp. 

7902010349 DOCKET 5O-354 Hope Creed Nuclear Station, Unit 1 
Forwards IE Circular 79-02, "Pal lure of 120 Volt Vital AC 
Power Buppl ies. " 

QRIER.B.H. Region 1, Philadelphia, Office of the Director. 

79/01/16, Bpp. 

7902130017 DOCKET 50-334 Hope Creek Nuclear Station, Unit I 
Forwards IE Info Notice 79-O1, "Bergen-Paterson Hydraulic 
Shock tt Suay Arresters IHSSA), " 

CRIER, B.H. Region 1, Philadelphia, Office of the Director. 

79/02/02. Ip. 

7902200502 DOCKET 50-354 Hope Creek Nuclear Station, Unit 1 
Foruards IE Bulletin 79-01. "Environ Qualification of Class 
IE Equipment. " U/list of 11 systematic evaluation program 
plant* for which no action is required. 

ORIER.D.H. Region 1, Philadelphia, Office of the Director, 

79/02/03. IP. 

7902090256 DOCKET 50-359 Hope Creek Nuclear Station, Unit 2 
Requests authorization to ute certain components in 
facilities designed to codes other than those specified in 
subsections (c) throuoh (f} of 10CFR5O. 55n. 

MITTL.R.L. Public Service Electric !. Gas Co, of Mem Jersey, 
79/01/30. 3pp. 

7902220257 DOCKET 50-339 Hope Creek Nuclear Station, Unit 3 
Responds to 790111 request for rovieui of paper "Vent 
Clearing During Simulated LOCA in a Mark 1 BUR 
Pressure-Suppression Sya. " Recommends paper be accepted for 
pub 1 i cat ion, 
GRIMES. C. Plant Systems Branch 7WO1/31. 2pp. 

79Q2BS0142 DOCKET 90-359 Hope Creek Nuclear Station, Unit 2 
Foruards Amend 5 to Const Permits CPPR-12O t, CPPR-lal,par 
ABLAH 790112 decl si on. Notice of issuance eticl. 
BOVD.R.8. Office of Nuclear Reactor Regulation. 79/OH/01, 4pp. 



7902260109 DOCKET 50-354 Hope Creek Nuclear Station, Unit 1 
Second suppl initial dBtlsion concluding that possibility of 
accident involving liquefied natural gas cloud from tanker 
Is ID remote that units need not be designed to protect 
against such accidents. 

LUTDN.E.. HILL. E. E. , PAfllB.O.H. Atomic Safety and Licensing Board 
Panel. 70/04/13. 57pp. 

790SS60112 DOCKET 50-354 Hope Creek Nuclear Station, Unit 1 
Federal Register notice at availability of ASLB second suppl 
Initial decision t. AOL AD deciilon. 
BAU-AUD, R. l_. Environmental Project Branch 1. 79/02/01. Bpp. 

7902220238 DOCKET 90-354 Hope Creek Nuclear Station. Unit 1 
Intervenors' petition for review of ALAB-519 re probability 
of haiardous cargo ship posing a danger> tt failure to order 
an EIS, Federal Energy Commission 790129 order encl. 
VANNES8, B. C. , WE8TRE1CH. H. . DNSDORFF. K. A. New Jersey, State of. 
79/02/OS. 15pp. 



7903230190 DOCKET 90-339 Hope Creek Nuclear Station. Unit 3 
Amend 5 to Const Permits CPPR-130 S, CPPK-121 adds conditions 
to ensure that NRC will be promptly alerted of possible 
traffic Increase of liquefied natural gas or liquefied 
petroleum gas. 
BOYD.R.S. Division of Project Management. 7V/02/O1. 4pp. 



7903280157 DOCKET 90-399 Hope Creek Nuclear Station. Unit 2 
Notice of issuance of Amend 9 to Const Permits CPPR-130 I. 
CPPR-12I. 
BAEO.R.L. Light Water Reactors Branch 2. 79/02/01. 2pp, 



7702080199 DOCKET 30-395 Hope Creek Nuclear Station, Unit 2 
Submits Dec 197B program activity review, comprised of info 
from selected sections of monthly rept, ui/sec tion on contract 
b billing statue removed. Lists meetings held d provides 
task-by-task activity summary, 

80BON.L.J. General Electric Co., Nuclear Energy Products Div. 
79/O2/09. 10pp. 



7902220231 DOCKET 90-354 Hope Creek Nuclear Station, Unit 1 
Extend* time for NRC consideration of petition to review 
ALAB-fllQ ti aniiuers until 790302. 

CHILK.B.J. Office of the Secretary of the Commission. 79/02/12. 
Ip. 



7902270317 DOCKET 90-355 Hope Creek Nuclear Station. Unit 2 
Forwards 770113 press release by Federal Energy Regulatory 
Commission re rejection of Tenneco LNO. Inc , appl i cati on to 
build liquified natural gas terminal at Hlt Doptford,NJ. 
CONNOR. T. B. Conner, Moore !. Corber. 79/OI/32. Ip. 



790214021B DOCKET 90-334 Hope Creek Nuclear Station. Unit 1 
Forwards binders & sets of divider tabs for use ut/NEDO-2i89B 
"Mark 1 Containment Program Load Dsfinitlon Rept." 
SOBON,L.J. General Electric Co, .Nuclear Energy Products Dlv. 
79/01/08. Bpp. 



7902260102 DOCKET 50-359 Hope Creek Nuclear Station. Unit B 
Foruards A8LAB 790113 decision !< ASLB second suppl initial 
decision of 7B0413, both re probability of postulated 
flammable gas cloud accidents from liquefied natural gas 
tanker* which could affect facility. 
DALLARD.R.L. Environmental Project Branch 1. 79/02X01. 



4pp. 



94 



DOCKETED ITEMS 



DOCKET 5Q-353 Hope Creek Nuclear Station, Unit 2 
Decision dtd 790113 <ftLAB-51B) concludes that Mammon 1 
vapor cloud accident i-s so unlllely that iti environ impact 
need not be considered. 

DUFLO,M. E. Atomic Safety and Licensing Appeal Panel. 79/01/12. 
97pp. 



7702360109 DOCKET 50-351 Hops Creei Nuclear Station. Unit 2 
Second suppl Initial decision concluding that possibility of 
accident Involving liquefied natural gas cloud from tanker 
ia 3D remote that unit* need not lie desifined to protect 
against such accidents. 

LUTON. E. . HILL.E.E.. PARIS.O.H. Atomic BafoliJ and Licensing Board 
Panel. 7fl/O<)/13. 37pp. 

790234.0112 DOCKET 50-333 Hope Creek Nuclear Station. Unit 2 
Federal Register notice at availability of ASLB second suppl 
Initial decision b ASLAD decision. ,, -> 

BrtLLAHD.R.L. Environmental Project Branch 1. 79/O2/Q1. ipp. 



7902260074 DOCKET 50-35B Wt 1 1 i am M. Zimmer Nuc >>er Station, Uni t 
Renuest. addl info need.* to compete s.fetu ev.lu.tion of 
OL application. Positions S. roquest* are based on Info in 
application thrnuoh Revision 50 I- responds to prior 

STOLZ*J S F. Li a ht Hater Reactor. Branch I. 7<7/O2/0=, Spp. 

79020903*3 DOCKET 50-383 William H. ZiMr Nuclear Station, Unit. I 
Forward* OE topical rept NEDQ-B4010-2, Supp 1 2. "Ga. is for 
Criteria far Combination of Earthquake * Other Transient 
Responses by the B^uar fr~Rsot-8um-Df-Th.-Bq.uar es m.thod. 
Jtept is provided on behalf of Mark 3 owner's group, 
SU-BON'U.J. Qenaral Electric Co.. Nuclear Energy Product. Div. 
79/02/05. lp. 

7-?02C--J03i7 DOCKET 50-3SB William H Zl er Nuc 1 jar """J; "" 
SLCP! E "Bails for Criteria for Combination of Earthquate I. 
Other Transient Response, B V the a ; uare-Roc.t-S.im-of~the- 
afluares Method," Discuise. method for combinina multiple 
peak dgnamic reaponsos for blait. & e.r thfluaVe.. 
KENNEDY.R.P. General Electric Co. .Nuclear Energy Product. Dlv 
7B/ 12/31, 30pp. 



77022E023S DOCKET 50-355 Hope Creek Nuclear Station. Unit 2 
Inttrvenon' petition for review of fiUAD-510 r* prnbabilits 
of hatardous carso ship posing a danger. A failure to order 
an EIS, Feilet-al Energy Commission 790123 order encl. 
VAHHE5B.S.C. , WE3TREICH, fl. . ONBDOnFF- K. A. NeyJerseij, State Or. 
79/Oa/OB. 13pp. 



79022EO231 DQCWET 30-353 Hope Creek Nuclear Station. Unit. 2 
Eitnnds time for NRC consideration of petition to review 
ALAD-Sia t. answers until 790302. 

CHILK. S. 0. Office of the Secretary o* the ComnisBion. 
lp. 



7902260340 DOCKET 50-338 William H. Zimmer Nuc 1 ear Bt.tiDm Unit 1 
In re.pnnse to 7B1213 Itr, c 1 arl f le. response to NUREO-0313, 
Section III re USD of austenitic fitainlota atael in BWH 

! A. Cincinnati Oas I. Electric Co. 79/O2/16. lp. 



7902270157 DOCKET SO-3SB Ul lllam H. Mmmer Nuc:ar Station. Unit 1 
No-ticc of availability of BER (NURee-0920) for WH Zimnur 

Nuclear Station. -,,,,-,. . 

BTDLZ. J. F. Light Water Reactor* DrancJi 1. 79/01/J1. ip. 



790214O218 DOCKET 30-333 Hope Creek Nuclear Station. Unit 3 
Foruards binder* t. >eta of divider tabs for uie W/NEDO-21BG8 
"Hark 1 Containment Program Load Definition Rept." 
EODON.L.J. General Electric Co. .Nuclear Efierc-y Products Dlv. 
7^/01/08, Spp, 

79O2010S4? DOCKET 50-333 Hope Creole Nuclear Btatinn. Unit 2 
Forwards tE Circular 79-D2, "Failure of 120 Volt Vital AC 
Poiijer Supplies. " 

Region 1. Philadelphia. Office of the Director, 

Bpp. 



7903270161 DOCKET SO-33B William H. Zlmraer Nuclear Station, Unit 1 
Forwards SED CNUREO-OSHO) S. Federal Register notice of 

BTCLZjJ.F. Uight Water Reactors Branch 1. 79/01/31. 2pp. 

7902270171 DDCKET 50-350 William M. limmar NucUar Station. Unit 1 
8ER for WH Zimmer Nuclear- Station. -,,.,-,. 

* Office of Nuclear fteactflr Rooulation. NUREO-052B. 79/01/31 

163pp. 



7902130017 DDCKET 30-355 Hope Creek Nuclear Station, Unit 2 
ForuardB IE Info Notice 79-01, "Beroen-PaterBon Hydraulic 
Shock b Suau Arrestors (HSBAJ," 

CftlEfi.IJ.H. Region 1, Philadelphia. Office of the Director. 

79/02/03. lp. 



790209034B DOCKET 50-358 Wt 1 1 iam H, Zinmer Nuclear Station. Unit 1 
Submits copies of Revision 10 to fire protection evaluation 
rept. 

, E. A, Cincinnati Qa i & Electric Co. 79/02/OB. 1pp. 



79023B0502 DOCKET 90-355 Hope Creek Nuclear Station, Unit a 
Forwards IE Bulletin 79-Oi, "Environ Qualification cf Class 
IE Equipment. " W/llt off 11 sy.tlen.atie evaluation program 
plants for which no action is require 
QF1IER.B. H. fiaaion 1. Philadelphia, 

79/02/08. IP. 



Office of the Director. 



790B360217 T/OCKET 3O-35B William H. 2immer Muclesr Station. Unit 1 
Provides adfll generic comment's ra -topics d-lBcusseit at 
7Blllt.-17 Ziwner ubc ommi ttee meet ing. Top i cs include rBactor 
veisel auppor-ts, fuel bundle 1 i Ft. suppress! on pool 
douncon^r*. lateral lood. (.control drive tube lotLnn. 
CATTON.1. California, Univ. of. Loa Angeles. 7B/11/30. 2pp.. 

790E210I5E DOCKET SO-359 Hilliam H. Zimmer Nuclear Station, Unit 1 
Informs NRC of Professor Pleise*'* subcommittee discus. ion 
at San Francitco meetinfl ro LOCft-re 1 ot*d hydrodynamic loads. 
Btated vnnt lataral loatfa due to steam candensati on uere 
random in magnitude fc diraction. -,~., n . ta 

CATTGN.,1. CalifornLa. Univ. HP' LosAngale*. 7B/12/IH. lp. 

790aSIOOAl DOCKET 90-358 William H. Ziramor Nuclear Btation, Unit 1 
Respond* to 781115 Itr requesting Info re NRC icivesti gation 
of cable trags. W/rolated correspondence, support ing 

" n * ^'ShU.'-Orfic. of t,e Director. 7B/I. 



101pp. 



790337O33B DDCKET 30-33E William H. Zimmer Nuclear Station. Unit 1 
Sutmits Revialon 11 to fire protactinn rept. 
QOROMANN, E. A. Cincinnati Oas & Electric CD. 79/02/23. Spp. 

79O22S0064 DOCKET 3O-359 Uilliam H. Zimmer Nuclear Station, Unit 1 
Motion by applicant to dismiss Miami Valley Power Project ai 
party to proceeding, d'ue to failure to file timely response 
to interrooat or iea. Urges, in alternative, that response be 
compolled. Certif icato of Qvc encl. 

WETTERHAHN. H. J. , CONNER, T. D. Conner, Moore t Corner. 79/01/S9. 
12pp. 

790214Oa6ii DHCHET SO-3BE1 William H. Zimmer Nuclear Station. Unit I 
Forward* ReviBion 53 to FSAR (Amend B9 to application). 
DOHOMfiNN, E. A. Cincinnati Oas tc Electric Co. 79/03/07. 2pp. 

79O2140270 DDCKET 80-353 William H. Zimmer Nuclear Station, Unit 1 
fleviion 33 to FSAR (Amend 83 to application! re equipment 
identification, test objective procedures, pipo fracture 
toughness i< accptance criteria. 
* Cincinnati Gas It Electric Co. 79/02/09. 22pp. 

7902S603ofa DOCKET 30-359 Uilliam H. Zimmer Nuclear Station. Unit 1 
Foriuartls Curti i icate of Svc of Amend 05 to 790312 
application for licenses in form of Revision 53 to FSAR. 
DOROMANN, E. ft. Cincinnati Gas fc Electric Co. 73/03/16, 2pp. 



7?0226060, BDCKET 50-330 William H. Zimmer Nuclaar Station. U 
Minutes of ACfiS 781117 subcommittee meeting to review 
license application of Cintinnati Ba* b Electric Co for 
license to operate unit.W/encl applicable Federal Register 
notice*, attendance list fc schematic drawings. 
* ACR3 - Advisory Committee 'on Reactor Safeguards. 

7902080290 DOCKET 50-350 William H. Zimmer Nuclear Station, Unit 1 
Announces 790313-14 m*etir B in/Hark II nuncr* group to 
dUcu LOCA I, safety relief valve pool dynamic load* 
flNDERSON.C. J. Containment Bitterns Branch. 79/01/21. 2pp. 



49pp. 



7903210031 DDCKET SO-33B William H. Zimmer Nuclear Station, Unit 1 
Lists project reviews for nuit fiva ACRS full committee 
meetings 
CftGCKEft, L. P. Division of Project Manaoemont. 79/O2/05. 2pp. 

7902010327 DOCKET 30-336 William H. Zimmer Nuclear Station, Unit 1 
Foruiarc-9 Insp Rept 30-353/73-21 on 78091B-2B !< 23-27 & 
notice of violation. 

HEfBHIIftN, R. F. Region 3, Chicago. Roactor Construction L 

Engineering Support Branch. 78/12/21, 2pp. 



DOCKETED ITEMS 



95 



7902010333 DOCKET SO -3 58 William H, Zimmer Nuclear Station. Unit 1 
Notice of violation tram Imp on 7B091Q-22 b 2B-29, 
9 Region 3, Chicago. Reactor Construction t. Engineering Support 

Branch. 70/12/21. ip. 

7902010333 DOCKET SO-33B William H. ZlmmHr Nuclear Station. Unit 1 
IE Imp Dipt 90-338/78-21 on 780918-22 t, 2B-39. Noncomp 1 lance 
noted: control of special procei> (uisld infl ) 

VANDEL.T.E., HAYES. D. W. . NOHELIUB, C. E. Region 3, Chicago, 

Reactor Conitruction h Engineering Support Branch. 78/12/21, 
40pp. 

7902120087 DOCKET 30-39B William H. Zimmer Nuclear Station. Unit 1 
Forwards IE Info Notice 79-01. "Bergen-Patersan Hydraulic 
Bhock & Sway Arrestors (HSSA). " 
KEPPLEft.J. 0. Region 3. Chicago. Office of the Director. 79/02/O2. 



7902210306 DOCKET 30-358 William H. Zimmer Nuclear Station. Unit 1 
Forward* IE Bulletin 79-01. "Environ Qualification of Class 
IE Equipment." W/list of 11 systematic evaluation program 
planti for which no action is required. 

KEPPLER.J. 0. Region 3, Chicago, Office of the Dir B ctor. 79/02/09. 

Ip. 

790227032Q DOCKET SO-33B William H. Zimmer Nuclear Station, Unit 1 
Forward* IE Info Notice 79-03, "LI ml torque Valve Geared 
Limit Switch Lubricant. " 

KEPPLERiJ.O. Rtgion 3, Chicago, Dfficti of the Director. 79/02/09. 

Ip, 

7902130103 DOCKET 30-33B Uilliam H. limner Nuclear Station, Unit 1 
Follouup on Interim rept on 781220 deficiency re dleiel 
ngln* turbachargir failures. Three niw turbocharger* will be 
supplied by vendor. 
BORONANN, E. A. Cincinnati Oa* t< Electric Co. 79/01/18. 2pp. 

7902120099 DOCKET BO-338 Uilliam H. Zimmer Nuclear Station. Unit 1 
Ack rteeipt of 7901 IS interim rtpt r dtesul engine 
turbacharger failures. 

HEIBHMANi R. F. Region 3, Chicago. Reactor Construction b 

Engineering Support Branch. 79/01/30, Ip. 



7902060176 DOCKET 90-961 San Onofre Nuclear Station, Unit H 
Submits Amend i to 780723 SNH license app 1 1 cation, provided 
in rispon'se to NRC 781120 nquist for addl security 
ffliaiures. 
DRAKE.J.H. Southern California Edison Co. 7B/12/13. . Ip. 



7902060177 DOCKET 90-361 San Onofre Nuclear Station. Unit 2 
Amend 1 to application for BNM Ilcenn.Addl security 
maasure* are needed to negate possibility of placing fuel 
assemblies In critical conf iguration- 
DRAKE.J.H. Southern California Ed i ion Co. 78/18/21. 4pp. 



790S220133 DOCKET 50-361 San Oimfre Nuclear Station, Unit 2 
"Deep Eiploration Drilling Program, Deuiater ing Well 6. " 
Primary program objective was to ensure, bi| closely spaced 
holes, that all significant cavities would be located 
Southern California Edison Co. 79/02/30. 2OOpp. 

7902220134 DOCKET 50-361 San Qnofre Nuclear Station. Unit 2 
"Eiploration/Orouting Program, Deuaterlng Well 6. " 
* Dechtel Power Corp. (Subs, of Bechtel Cprp. ). 79/Oa/2H. 

7902270377 DOCKET 30-361 San Onofro Nuclear Station. Unit 2 
Forwards Itr re C-E topical rapt no longer Eunsidered 
proprietary. Document should be forwarded to PDR 
TIBBITTS. D. L. Light Water Reactors Branch 2. 79/03/22. 

7908270380 DOCKET BO-361 Ban Onofre Nuclear Station, Unit 2 
Reviewed topical rcpt, CENPD-7 Addendum 1, "Response to AEC 
Questions Related to San OnoFre Units S !. 3. " Determined 
rapt no longer contains proprietary infn. 
SCHERER. A. E. Combustion Engineering, Inc. 79/Q2/QB. ip. 



7902010169 DOCKET 30-361 San Dnofre Nuclear Station. Unit 2 
Comments re health aspects op DES. Fac i 1 i ties can be operated, 
to meet current radiation protection guidance t, provide 
adequate protection of public health I. safety 

WEAVER, C.L. HEW, Dept. of, Food (.Drug Administration. 79/01/25 
2pp. 

7902060301 DOCKET 30-361 San Onofre Nuclear Station. Unit 2 
Forwards review comments on DES. 
DRAKE.J.H. Suuthern California Edisan Co. 79/02/O2. BOOpp. 

7902270367 DOCKET 50-361 San Onofre Nuclear Station, Unit 2 
Forwards NRC comments on DES re mater quality radiological 
dangers, environ dose commitments, environ monitoring reactor 
accidents, high level waste mg t. transportation, fuel cycle t< 
long term dose assessments. 
DEFALCO, P. Environmental Protection Ajencij. 79/02/13. 14pp. 



7902130172 DOCKET 30-361 San Onofre Nuclear Station, Unit 3 
Forwards Amend 1 to "Fir Haiards Analysis !< Comparison 

ui/App A of NliC Branch Technical Position 9. 5-1. Oct 1977 " 

BA8KIN.K.P. Southern California Edison Cn. 71/03/03. Ip. 

7902I3017B DOCKET 30-361 San Onofre Nuclear Station, Unit 2 
Amend 1 to "Fir B Haiards Analysis (. Comparison u/App A of 
NRC Branch Technical Position 9. 5-1, Oct 1977 " 
Southern California Edison Co. 7B/12/31, 37pp. 

7902130126 DOCKET 90-361 San Dnofre Nuclear Station, Unit 3 
Confirms time, place & date to take deposition of Ron 
Cantons, 

CASEY. 6. B. Chicterlnq t. Gregory. 79/01/16. Ip. 



173pp. 



7902020366 DOCKET 90-361 Ban Dnofre Nuclear Station. Unit 2 
Forward* proprietary Si nun-proprietary info presented at 
781214 meeting u/NRC. Info includes data from spacer grid 
Impact testing li loads calculated by analysis. Affidavit 
rtquettlng 10CFR2. 790 itatus ncl. 
HAYNE8.J. 0. Southern California Edison Co. 79/12/37. 6pp. 

7902020269 DOCKET 90-361 Bn Onofre Nuclear Station, Unit S 
Slide* depicting structural analysis method* testing, 
proparties & analysis & test results for C-E 16X16 fuel 
assembly. From 781214 prejantation to NRC. 
* Combustion Engineering. Inc. 7B/12/14. 31pp. 

7902260390 DOCKET 80-361 3an Onofr* Nuclnar Station, Unit 2 

Foruardi cammants on geolo'gic & seismic repts used in 

geologic review, Ditcuisoi onshore faults. fractures b shear 

joint* undorlving faci 11 ty, basement rock complei ti offshore 
gravity It magnetic data. 
DAVI3, J, F. California. State of. 79/01/16. 3pp. 

79021 401 3B DOCKET 30-361 San Onofri Nuclear Station. Unit S 
Dlvcuises schedule by which marine invlron monitoring 
program was conducted. Fac t that plankton b booth ic-diving 
iurvui were not conducted until 3rd quarter 1978 probably 
did not result In loss of significant data. 
BABKIN.K.P. Southern California Edison Co. 79/02/02. 2pp. 

7902220130 DOCKET 90-3>1 San Onofre Nuclear Station, Unit 2 
Forwards two rspts re demobiliilttg Deiiratarlng Mall 6. 
BABKIN.H.P. Southern California Ediion Co. 79/02/16. 2pp. 



7902S10031 DOCKET 30-361 San Onofru Nuclear Station, Unit 2 
Lists project reviews for neit five ACR8 full committee 
meetings. 
CROCKEfi. L. P. Division of Project Hanagemnnt. 79/02/OS. 2pp. 

7902010341 DOCKET 30-361 San Onofre Nuclear Station, Unit 2 
Forward* IE Insp Repts 30-361/79-19 t, 50-363/7B-1S on 
7H1101-30. No noncomplianco noted. 

Sollf? ' B- Re O i " 3- 3n Francisco, Office qf the Director 
79/O1/04. 2pp. 

7903010330 DOCKET 50-361 San Onofre Nuclear Station. Unit 2 
IE Insp Repts 50-36I/7B-19 t, 90-362/7B-1S on 7011O1-30 No 
noncompliance noted, Major areas inspected: p 1 ping 
in.tallation, piping post weld heat treatment. recul ving inap, 
reactor pressure vessel & internal* protection 
PATE.fi. J.. HAVNES.R.C. Region S. San Francisco, Reactor 
Construction & Engineering Support Branch. 70/12/28, 6pp, 

79021S013B DOCKET 50-361 San Onofre Nuclear Station. Unit B 
Forwarda IE Info Notice 79-01, "Bergen-PatErson Hydraulic 
Shock t, Suau Arrestors (HSSA). " 

ENOELKEN, R. H. Roglnn 3, Ban Francisco, Office of the Director 
79/02/02. Ip, 



7902230071 DOCKET 30-361 Ban Onofre Nuclear Station, Unit 2 
Forwards IE Bulletin 79-01. "Environ uiial i ? ica t ion of Class 
IE Equipment." W/list of 11 systematic evaluation program 
plants for which no action is required. 
ENOLEKEN, R. H. Region 5, San Francisco, Office nf the Director. 



9S 



7-5O222OJ19 DOCKET SO -366 Eduiin I. Hatch Nucl 
Informs that TRAOOC Pamphlet 330-30. " Inter 
For Instructional Sys Development" referenc 
is available In microfiche forn from NRC 

J Division of Document Control. 



DOCKETED ITEMS 



ar Plant, Unit 5 



in NUHEG-0219 



5pp. 



79032B0310 DOCKET 50-366 Edwin I. Hatch Nuclear Plant, Unit 
Justifies eiemption Pram license amend fee for Tach Spec 
Chang*. Addresses several points in Footnote a to table of 
amend fees schedule. Reserves right to request refund Df 
*4, 000 fee. 
WHITMER.C.F. Georgia Pouier Co. 79/03/21. 3pp. 



7902090237 DOCKET 50-366 Eduin I. Hatch Nuclear Plant, Unit 
Requests eitension until 790323 to comply in/increased 
physical protection requirements, due to delay in receiving 
long lead-time equipment. 
WHITHER, D. F. Georg ia Pniuer Co. 79/O1/30. Ip. 



7902230337 DOCKET 3O-366 Eduiin I. Hatch Nuclear Plant, Unit 2 
Forwards copies of duplicate Amend 10 to Indemnity Agreement 
D-69 to replace lost cop ies. Requests eiecution of copies 
& one copy returned. 
DINITZi I. Antitrust !. Indemnity Group. 79/O1/31. 3pp. 

7902120171 DOCKET 50-366 Eduin 1. Hatch Nuclear Plant, Unit 2 
Forwards Endorsement 47 to NELIA Policy NF-215. 
FIELDER. J. Marsh (.McLennan. Inc. 79/O2/06. 2pp. 



790224.0340 DOCKET -50-366 Ediuin I. Hatch Nuclear Plant. Unit a 
Fnruarda Endorsement 39 to MALEU Policy hF-7B. 
DUCK, J. R Marsh (, McLennan, Inc. 79/02/19. 2pp 



7902140-218 DOCKET 30-366 Edwin I. Hatch Nuclear Plant, Unit 2 
Forwards binder* & sets of divider tabs for use w/NEDD-21699 
"Hark I Containment Program Load Definition Repfc. " 
SQBQWiL.J. General Electric Co. .Nuclear Energy Products Div. 
79/OI/OB. Bpp. 

79020J03 I ?0 DOCKET 50-366 Ediuin I. Hatch Nuclear Plantr Unit S 
Summary of 790110 meeting ui/util to review proposed 
design of Class IE sys capable of protecting reactor 
protection sys from poor electrical pouier. Forwards 
presentation on power supply proposed mod. 
VERRELLI. D. M Operating Heactors Branch 3. 71/01/17. 20pp. 



7903140324 DOCKET 50-366 Edwin I. Hatch Nuclear Plant, Unit S 
Ac k receipt of 79O116 Itr Informing NRC of steps talc on to 
correct violation noted in IE Insp Repts 3O-321/78-4S b 
50-366/70-51. 

LEWIE, R.C. Region 3. Atlanta, Reactor Operations Nuclear Support 

Branch. 79/01/23. Ip. 

7902140332 DOCKET 50-366 Eduin I. Hatch Nuclear Plant, Unit 2 
Responds to NRC 7B1229 Itr re violation noted in IE Inap 
Repts 50-321/76-43 It 5Q-366/7B-31. Correct Ive actions: none, 
since Individual in question met Tech Spec requirement* at 
time of NRC insp. 
STAFFA.R.H. Qaorgia Pouer Cn. 79/01/16. Ip. 

79022B0005 DOCKET 50-366 Eduin 1. Hatch Nuclear Plant, Unit 2 
Corrects 790132 Itr. Last line of paragraph I ihould read: 
"Me ulll eiamine your corrective action* t< plans during 
subsequent insps. " 

LEWIS, R.C. Region Si Atlanta, Reactor Operations Nuclear Support 

Branch, 79/01/30. Ip. 

79022B0071 DOCKET 50-366 Eduiin I. Hatch NucUar Plant. Unit 3 
Forwards IE Info Notice 79-01. "Bergen-Paterion Hydraulic 
Shock t Sway Arrestors IHSSA). " 

O'REILLV, J. P. Region Si Atlanta, Office of the Director. 

79/03/02. 5pp. 

7903120213 DOCKET 30-366 Ediuin I. Hatch HucUar Plant- Unit S 
Forwards IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment. " 

O'HEILUV, J. P. Region 2, Atlanta, Office of the Director. 

79/Q2/OS. 3pp. 



7902230335 DOCKET 50-366 Edmin I. Hatch Nuclear Plant, Unit 2 
As folloujup to NRC 7B1113 request for util submittal of 
DFPsite Dose Calculation Manual for NRC approval, foruards 
guidelines for general contents of manual, 

QRIMEB.B.K- Assistant Director for Engineers t, Projects. 

79/O1/1B. Spp. 

7902020347 DOCKET 50-366 Eduin 1. Hatch Nuclear Plant, Unit 3 
Forwards Amend 62 to License DPR-57 t Amend 3 to License 
NPF-5 in response to 79011B Ji 19 requests, H/enc 1 safety 
evaluation t< notice of issuance 
IPPDLITO. T. A. Operating Reactors Branch 3. 79/01/23, 3pp. 



7903020353 DOCKET 30-366 Eduiin I. Hatch Nuclear Plant, Unit 2 
Safety evaluation supporting Amend 62 to DPR-57 It Amend 3 to 
NPF-5 Determines that change to manual action rather than 
automatic undervoltage trip does not decrease safety 
margins. Recommends Issuance of amends, 
* Office of Nuclear Reactor Regulation. 79/O1/22. 3pp. 

7902030356 DOCKET 50-36i Eduiin I. Hatch Nuclear Plant, Unit 2 
Notice of issuance of Amend 63 to DPH-57 li Amend 3 to NPF-5, 
IPPOUTO, T. A. Operating Reactors Branch 3. 77/01/22. 2pp, 

790215015'! DOCKET St>-3i6 Eduiin I. Hatch Nuclear Plant. Unit 2 
Requests addl info re requirements for solidification ti 
.proposed radiological effluent Tech Specs. Requests info 
within 3O days at receipt of Itr. 
IPPOLJTO, T. A. Operating Reactors Branch 3. 79/01/29. Spp, 

7902220257 DOCKET 30-366 Eduiin 1. Hatch Nuclear Plant, Unit 2 
Responds to 790111 request for revieu of paper "Vent 
Clearing During Simulated LOG A in a Mark I HWR 
Pressure-Suppression Sys. " Recommends paper be accepted for 
publlcati an. 
GRIMES, C. Plant Systems Branch. 79/01/31. 2pp. 

79O2130Q1B BOCKET 50--366 Edwin I. Hatch Nuclear Plant, Unit 3 
Informs of need Por revision to GE std Tech Specs. Lists 
specific changes to be proposed within 30 days ?< specific 
additions to provide guidance In elocution of required 
ac t! ans. Re levant Tech Spec pages encl. 
1PPOLITO.T, A. Operating Reactors Branch 3. 79/O2/O1, llpp, 

790EO30195 DOCKET 50-366 Eduiin 1. Hatch Nuclear Plant, Unit 2 
Submits DBC 197H program activity review, comprised of info 
from selected sections of monthly rept, u/section on contract 
& billing status removed. Lists meetings held !< provides 
lask-bo-task activity summary. 

SODOM, L.J. General Electric Co. .Nuclear Energy Products Div. 
79/O3/05 lOpp 



7902120225 DOCKET 30-366 Edmin I, Hatch Nuclear Plant, Unit a 
IE Bulletin 79-01 "Environ Qualification of Class IE 
Equipment". 
Office of Inspection & Enforcement. 79/03/03. 4pp. 

7902230038 DOCKET SO-366 Edwin I. Hatch Nucl.ar Plant- Unit S 
Ack receipt of IE Insp Rept 5Q-366/7EJ-53 on 790119. No 
proprietary info. 
STAS9A,H.W. Georgia Pouier Co, 79/03/03. Ip, 



7902210163 DOCKET 50-366 Eduin 1. Hatch Nuclear Plant, Unit 3 
Foruards IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment." U/list of 11 systematic evaluation program 
plants for which no action is required. 

O'REILLV, J. P. Region 2, Atlanta, Offlct of the Director. 

79/02/OS. 3pp. 



79022B0115 DOCKET 50-366 Edwin 1. Hatch Nuclear Plant. Unit 2 
Forwards IE Info Notice 79-03, "Limitorqiie Valve Snared 
Limit Suite h Lubricant. " 

O'REILLV, J, P. Region 3. Atlanta, Office of the Director. 

79/02/09. 2PP. 



7902130090 DOCKET SO-366 Eduin I, Hatch Nuclear Plant. 
Forwards monthly operating rept for Jan 1979. 
MANRV.M. Georgia Pouier Co, 79/03/07. Ip. 



7902130091 DOCKET 50-366 Ediuin I. Hatch Nuclear Plant, 
Monthly operating rept Por Jan 1979. 
UILSDN, S, Georgia Pouier Co. 79/03/03, 19pp. 



7902230019 DOCKET 50-366 Edwin 1. Hatch Nuclear Plant, Unit 3 
Forwards LER 79-01 1 /03L-O. 
MANRViM. Georgia Power Co. 79/01/39, Ip, 



7903220023 DOCKET 50-366 Eduiin I. Hatch Nuclear Plant, Unit 2 
LER 79-011/03L-0 on 7901 17: during normal ttartup test & 
reactor in cold shutdown, review of HNP-3-31&0 (RHR pump 
nperabll 1 ty> revealed required flow not being met. Caused by 
procedural error by personnel. 
GREENE, T. Oeorgia Power Co, 79/01/29, Spp. 



7902150379 DOCKET SO-366 Edwin I. Hatch Nuclear Plant, Unit S 
Forwards LER 79-01O/O3L-0. 
MANRY, H. Georgia Pouier Co. 79/02/03. Ip. 



DOCKETED ITEMS 



7902130304 DOCKET 90-366 Eduin I. Hatch Nuclear Plant, Unit 2 
LER 79-01O/03L-O nn 7-70117: In cold shutdown, uih i 1 e pel-forming 
HNP-2-3B20, switches 3B31-N301 F, H t. L did not ac tuate. Caused 
bg switch diaphragm failure. 
NIX, R. T. Georgia Power Co, 79/03/O2. Ip. 

7903190289 DOCKET 90-366 Edwin 1. Hatch Nuclear Plant, Unit 2 
Forwards LER 79-014/03L-0. 
MANRY.M. Georgia Pouer Co. 79/02/O7. Ip. 

7903150293 DOCKET 30-366 Edwin I. Hatch Nuclear Plant, Unit 3 
LER 79-014/03L-0 on 790127: dur Ing cold shutdown, 
underfrequencg trip setpoint uias found at 94. 4H for motor 
generator st "D" below Tech Spec min. Caused by erroneous 
tatting due bo pro-operational test. 
NIX.R.T. Georgia Power Co. 79/02/07. Ip. 

7903190348 DOCKET 90-366 Eduiln I. Hatch Nuclear Plant. Unit 2 
Foruardi LER 79-016/O3L-0. 
MANRY, M. Georgia Pouer Co. 79/02/07. Ip. 



7902330142 DOCKET 90-366 Eduiln 1. Hatch Nuclear Plant. Unit 2 
LEF1 79-017/O3L-0 on 790130: "A" recombiner declared 
Inoperable when heater sheath temp could not be increased 
600 F. Caused bg bad solder connection on power supplg 
Connection reaoldored. 
NIX.R.T. Georgia Pouior Co. 79/03/33. Ip. 

7903330111 DOCKET 50-366 Eduiin 1. Hatch Nuclear Plant, Unit a 
Forwards LEH 79-019/O3L-0. 
MANRY. M. Georgia Pouer Co. 79/02/16. Ip. 

7902230119 DOCKET 90-366 Eduin I Hatch Nuclear Plant, Unit 3 
LER 79-OI9/03L-0 on 770301 : innordoor seal t. shaft seal Found 
to be leaking. Caused by crack an inner lip of seal, which was 
replaced. Shaft seal uiaa dry when removed. Seal cleaned, 
lubricated & reinstalled to sati 6f acti nn. 
NIX.H.T. Qoorgia Pouier CD. 79/02/16. Ip. 



79022703B7 DOCKET 50-366 Ediuin 1. Hatch Nuclei 
Forward! LER 79-021 /01T-0. 
MANHY,M. Georgia Power Co. 79/02/19. Ip. 



Plant, Unit 3 



7903130391 DOCKET 90-366 Eduin I. Hatch Nuclear Plant, Unit 3 
LER 79-016/03L-0 on 790127: ovorvol tags trip lotpoint For 
reactor protection sy motor generator set "D" found at 
IBS. 6 valtl AC beloui Tech Qpscs min. Caused bg setpolnt 
drift. 
NIX.R.T. Georgia Power Co. 79/O2/O7. Ip. 



7902270390 DOCKET 50-366 Eduiin I. Hatch Nuclear Plant, Unit 2 
LER 79-021/01T-Q on 790307; during test, tujo rec irculati on 
pump drive flow cnastdouin transients failed to meet Level 1 
Btds. Plant tafcen to higher power for mope testing, thereby 
deviating from F9AR. Caused by sga vendor error 
GHEENE, T.v. Georgia Pouier Co. 79/03/19. 3pp. 



7902190397 DOCKET 30-366 Edwin 1. Hatch Nuclear Plant, Unit 2 
Forwards LER 77-019/03L-0. 
HANHYiM. Onorgia Power Co. 79/02/07. Ip. 

7902190386 DOCKET 90-366 Eduin I. Hatch Nuclear Plant. Unit 2 
LER 79-019/03L-0 on 790127: undirvol tage trip on motor 
generator lit "D" uiai 40 volts AC, below Tech Specs min. 
Caused by lou undervol tage setpolnt, 
NIX.R.T. Georgia PouiBr Co. 79/03/07. Ip. 



7902190342 DOCKET 90-366 Edwin I. Hatch Nuclear Plant, 
Fnruardi LER -79-02O/03L-0. 
MANRY, M, Oeorgia Power Co. 79/OB/OB. Ip. 



7902190344 DOCKET 90-366 Eduin I. Hatch Nuclear Plant. Unit 2 
LER 79-020/03L-0 on 79011B:Tflble 2 of HNP-3-3B09 diesel 
generator oil storage quantity found to bo in error 
Indicating Tech Spec noncompliance. Caused by incorrect tant 
level calculation. Procedure revived ( submitted. 
BAXLEY.B. X. Georgia Power Co. 79/02/OS. 3pp. 



7903190300 DOCKET 90-366 Eduin I. Hatch Nuclear Plant, Unit 2 
Foruiardi LER 79-013/03L-0. 
KAMRY, M. Oeorola POUI.P Co, 79/02/09. Ip. 



7902190309 DOCKET 90-366 Eduiin I. Hatch Nuclear Plant, Unit 3 
LEfl 79-013/03L-0 on 7901H3:uhilo in refuel mods, control rod 
& control rod drive removal uas begun before performing one- 
rod out rifue-llng Interlock opurabUllty test. Caused by 
omltilon of this step in proceduro. Procndure to be revised. 
OREENEiT. ' Oeorgia Power Co. 79/02/04. Ip. 



79030B029O DOCKET 90-367 Dailly Generating Station 

Announces 790213-14 meeting u/Marfc 11 (miners group to 
discuis LQCA tt safety relief valve pool dynamic loads. 
ANDERSON, C, J, Containment System 6 Branch 79/01/21. 



2pp. 



7903090343 DOCKET 50-367 DailliJ Generating Station 

Forwards QE topical rept NEDO-34010-2, Bup pi 3, "Dates Fnr 
Criteria for Combination of Earthquake & Other Transient 
Responses by the Squaro-Hoot-Sum-Qf-ThB-Siiuares method. " 
Rept is provided on behalf of Hark 2 oiuner's group. 
SQBDN, L. J. Goneral Electric Co., Nuclear Energy Products Div. 
79/02/09. Ip. 

7903090367 DOCKET 50-367 Dailly Oeneratino Station 

Suppl 2 "Dasis for Criteria for Combination of Earthquake !( 
Other Transient Hosponsos Dy the anuare-Root-Sum-of-th e- 
Squaros Method," Discusses method for combining multiple 
peak dynamic responses for blasts & earthquakes. 
KENNEDY, R.P, General Electric Co. , Nuclear Energy Products Div. 
NEDO-21010-2. 70/13/31, 30pp. 

7903120169 DOCKET 50-367 Dailly Generating Btation 

Requests amend to canst permit for completion date to be 

extended (rain 790901 to Q909O1. (Inquest duo to delays in 

issuance of const permit t< const luspension. W/encl Class II 

fee. 

SHORD.E.M. Northern Indiana Public Service Co, 79/02/0-7. 4pp. 



7902330061 DOCKET 30-367 Dailly Generating Station 

Informs that TRrtDdC Pamphlet 390-30, "Intersorvice Procedures 
for Instructional 8ys Development" rofereneed in NUHEO-Oai9 
in available in microfiche form From NRC. 
DEBAW, W. J, Division of Document Control. 7B/H/20. 3pp. 



7902190362 DOCKET 90-366 Eduiin I. Hatch Nuclear Plant, 
Foruards LER 78-006/03L-2, 
MANRViM. Oeorgia Power Co. 79/02/09. Ip. 



7902190363 DOCKET 90-366 Eduin I. Hatch Nuclear Plant, Unit 3 
LER 7B-006/Q3L-3 on 780734: during heatup plateau of startup 
tet tlnfli average dryuell temp eiceeded 139 F 1 imlt. Reactor 
heatup then tirmlnated. Fol louiing 7B0727 shutdown, dryuiel 1 air 
tmp itratlf Icatlan found. Details encl as Revision 3. 
OREENE, T. V. Gaorgla Pouier Co. 79/02/09. 23pp. 

7902330112 DOCKET 30-366 Eduin I. Hatch Nuclear Plant, Unit 2 
Notlflu that LER 90-366/79-12 voided! not raportabla. 
MANRY, M, Georgia Pouer Co, 79/02/O9. Ip. 



7903330134 DOCKET 90-366 Eduin 1. Hatch Nuclear Plant, Unit 2 
Notifies that LER 90-366/79-1B voldBdinot reportable. 
MANRY, M. Qorgia Power Co, 79/02/09. Ip. 



7902230137 DOCKET 90-366 Eduin I. Hatch Nuclear Plant, Unit 2 
Forward* LER 79-017/03L-0. ' 
NANRY, M, Georgia Polos r Co. 79/03/14. Ip. 



7903360239 DOCKET 90-367 Daillg Generating Station 

aummariies 7BI313 meeting in Bethesda,MD, ui/represontat ives 
of utils w/past-CP application* to discuss pending OL 
revieu metiers, including staff policies & revieu prioritg 
criteria. Discussion areas !< attendees list end, 
LICITRA.E. Light Water Reactors Dranch 3. 79/01/1S. Bpp. 

7903120147 DOCKET 90-367 Dalllu Generating Station 

Forwards IE Info Notice 79-01, "Dergon-Paterson Hydraulic 
Bhocfc & Buag Arresters (HS5A>. " 

KEPPLER,J.O. Region 3, Chicago, Offico of the Director. 79/03/03, 

tp. 

7902310178 DOCKET 90-367 Dailly Generating Station 

Forwards IE Dullntin 79-01, "Environ Qualification of Class 
IE Equipment. " If/list of 11 systematic evaluation program 
plants for which no action is required. 

KEPPLERiJ.G. Region 3, Chicago, Office of the Director. 79/02/09. 

IP- 

7903270394 DOCKET 50-367 Qailly Generating Station 

Forward* IE Info Notice 79-03, "Limitorque valve Geared 
Limit Switch Lubricant." 

KEPPLER.J.Q. Region 3, Chicago, Office of the Dirot tor. 79/02/09, 

Ip. 



100 



DOCKETED ITEMS 



790305Q313 DOCKET 50-367 Bailly Generating Station 

Forwards uell cfiarts For 7901 10-01 17, char ts re Qailly wells 
u/o recorders for 790117, pond levels for 7901 17, pneunat ic 
pi-assure transducers For 790117 & water meter readings for 
7901 17. 
BOHN.R J Northern Indiana Public Service Co. 79/01/24. 32pp. 

7903140134 DOCKET 50-367 Baillu Generating Station 
Forwards uell charts for 7901 17-24, Da i ley uells uj/o 
recorders tor 790134, pond levels for 790124, pneumatic 
pressure transducers for 790124 d uater meter readings For 
7901 17-34. 
BONN, R. J. Northern Indiana Public Service Co. 79/O2/02. 34pp. 

7902200069 DOCKET 50-367 Bailly Generating Station 
Forwards uell charts For 790121-31, D<ii 1 Ig uiells ui/a 
recorders for 7<!QI31. pond levels For 790131 . pneumatic 
pressure transducers far 790131 I- water meter readings For 
790125 i 790131 
BDHN.R.J. Northern Indiana Public Service Co. 79/02/0?. 32pp. 

7903330167 DOCKET 5O-367 Qailly Generating Station 

Forwards "Fall 1979 Quarterly Kept" on ecological monitoring 
program. Finds no major population fluctuations in aquatic or 
terrestrial communities in study area. 
PUHCELL.J. F. Northern Indiana Public Service Co. 79/03/14. Ip. 

7902230190 DOCKET 50-367 Gailly Generating Station 

"Fall 197B Quarterly Repf including data For Aug 197B, not 

completed prior to summer rept. 

* Northern Indiana Public Service Co. 79/01/15, 130pp, 

7903230160 DOCKET 5Q-367 Dailly Generating Station 

Foruards ujell charts For 790131-0207 Gailly wells a/a 
recorders for 79D207, pond levels For 790207, pneumati c 
pressure transducers for 790207, water meter readings For 
7902Q7 !. UBGS ueUs for 790207. 
BCHN.R.J. Northern Indiana Public Service Co. 79/02/16, 33pp. 

79022B0306 DOCKET 50-367 Bailly Generating Station 

Informs of 7BOBO3 deficiency in high pressure core spray sys 
bypass valve, reportable under 10cFR30. 55(e) . Caused by use of 
150 psi disk, rather than 600 psi disk. Disk uias replaced. 
Deficiency reported to R Heishroan of Region 3 on 700804. 
SHORE. E. M. Northern Indiana Public Service Co. 79/02/22. 2pp. 



7903130124 DOCKET 50-36B Arkansas Nuclear One. Unit 2 
Provides suppl info to 790109 Tech Spec change request 
re loui steam generator water level setpoint, 
WILLIAMS, D. H. Arkansas Power t, Light Co. 79/03/02. Ip. 

7902200008 DOCKET SO-360 Arkansas Nuclear OnB, Unit 2 
Remits check for difference between Class II Fee paid t. 
Class III determination. 
WILLIAMS, D. H. Arkansas Power & Light Co. 79/02/06, Spp. 

79022B0179 DOCKET SO-368 Arkansas Nuclear One, Unit S 
Summary of 780916 meeting re overload conditions on 
startup transformer No 2 & consequent containment spray. 
Attendance list, simplified line diagram t. IE response to Div 
Sys Safety/Operating Reactors questions end. 
ENQLE.L.B. Light Water Reactors Branch 1. 79/02/09. 23pp. 

7903090119 DOCKET 3O-36B Arkansas Nuclear One, Unit 2 
Forwards IE Insp Repts 3O-313/7B-19 S. SO-360/7H-36 on 
791023-1119 !< notice of violation, 

MADSEN, Q. L. Region 4, Dallas, Office of the Dlrnctor, 78/18/14. 
2pp. 

7902090121 DOCKET 50-36B Arkansas Nuclear Onn. Unit 2 
Notice of violation from insp on 781023-1119, 
Region 4, Dallas, Office of the Director. 7B/12/14. Ip. 

7902090123 DOCKET 30-36S Arkansas Nuclear One, Unit 2 

IE Insp flepts 80-313/78-19 ti 30-368/78-26 on 7B1023-1119. 

Noncompliance noted: nonfunctional penetration fire barrier 

in 2A3 switchgear room tt quorum not formed according to Tech 

9p e c s , 

Region 4. Dallas, Office of the Director, 7B/12/14. 20pp, 

7902360017 DOCKET 50-368 Arkansas Nuclear One, Unit 2 
Forwards IE Insp Repts 30-313/73-21 S, aa-36B/7S-3B on 
7B1I20-1217 !. notice of violation. 

MADSEN, Q.L. Region 4, Dallas, Reactor Operations Nuclear Support 
Branch. 79/01/09, 2pp. 

7903260019 DOCKET 50-368 Arkansas Nuclear One. Unit S 
Notice of violation From Insp on 781130-1217, 

* Region 4, Dallas, Reactor Operations Nuclear Support Branch, 
79/O1/O4. Spp. 



7902090349 DOCKET 3O-36B Arkansas Nuclear One, Unit 2 

Submits certified copies of Endorsement ED -IB t EO-6S to 
ANI Binder !< XD-4B & XD-6B to MAELU Binder eitending 
coverage for 1979. 
WILLIAMS, D.H Arkansas Power t, Light Co, 79/02/09. 9pp. 

79O22B033B DOCKET 50-360 Arkansas Nuclear One. Unit 2 
Forwards Policy NF-210 Endorsement 35 t. Policy HF-71 
Endorsement 31 far calendar year 1979. 
RUETEH.D. A. Arkansas Pouier (. Light Co. 79/03/23. 3pp. 

7902020291 DOCKET 50-36B Arkansas Nuclear One, Unit 2 

Forwards proprietary d nonproprietarg versions of "Wylc Labs 

Test Rept 56304" (, suppl . W/afFidavi t requesting proprietary 

treatment oF enc 1 data. Proprietary version withheld 

Cref 10CFHa.790). 

WILLIAMS, D. H. ArVansas Poujer !c Light Co. 79/01/23, Spp. 

790E020256 DOCKET 50-368 Ariansas Nuclear Dne, Unit 2 
Wyle Labs Test Rept 36304. "Environ Qualification Test 
Program. " 

ANDERSON. J. J. . FRANZ, W. K. , SHIPUAYi 0, D. Arkansas Power I. Light Co 
26304. 78/12/12. 181pp. 

790301O17B DOCKET BO-36S Arkansaj Nuclear One, Unit 2 

"BtW 177 Fuel Assembly Owner's Group Asymmetric LOCA Loads 
Evaluations Program, Phase 2." Evaluated components include: 
re-aelor pressure vessel, Fuel assemb It es, control rod drives t 
core flooding piping. 
Florida Power Corp, 7B/10/10. 9pp. 



7902260022 DOCKET 50-36B Arkansas Nuclear One. Unit 2 

IE Insp Ropts 30-313/7B-21 !< 50-36H/7B-28 on 781120-1217. 
Noncomp 1 iance noted: surveillance testing ti callbr rocorJi, 
UESTERHAN. T. P. . VEFIDUZCD, O. H. , MADSEN, 0. L. Region 4, Dallas, 

Reactor Operations Nuclear Support Branch, 79/01/04, 17pp. 

7902010315 DOCKET 3O-36B Arkansas Nuclear One, Unit B 

Forwards IE Circular 79-02, "Fai lure of ISO Volt Vital AC 

Pouer Supp lies. " 

9EVFRIT.K.V. Region 4, Dallas, DfFice of the Director. 79/01/16. 

7pp, 

7903150344 DOCKET 5Q-36B Arkansas Nuclear One. Unit Z 

Ack receipt of 790102 Itr responding to violation noted in 

IE Insp Rept SO-36B/7B-26. Reaponso has been forwarded to 

headquarters mgt y/request for interppatation & 

c larl f Station 

MADSEN. 0. L, Region 4. Dallas, Reactor Operations Nuclear Support 

Branch. 79/01/24. Ip. 

7902150250 DOCKET 3O-36S Arkansas Nuclear One, Unit 2 

Responds to NRC 7B1214 Itr re violation noted in IE Insp 
Rept 00-36B/7B-26. Does not believe Tech Specs uere violated. 
CAVANAUGH, U. Arkansas Pouer t< Light Co. 79/01/02. 2pp. 

79032B0135 DOCKET 50-36B Arkansas Nuclear One, Unit 2 

Forwards IE Info Notice 79-01, "Bcrgen-Patersan Hydraulic 

Shock & Sway Arrestors (HSSA), " 

SEYFHIT.K. V. Region 1. Dallas, Office of the Director, 79/02/02, 

IP. 



7902260034 DOCKET 5O-3tB Arkansas Nuclear One, Unit 3 

HBquusts addl *2,aOO for difference between Class II Fee 

paid & Class III determination. 

DIOsa, R.M. LicBne Fee Management Branch. 79/01/30. Ip. 

7902C-B018B DOCKET 50-368 Arkansas Nuclear One, Unit 2 

R*fers ko 790111 proposed industrial security plan revision. 
Eipect* nil security equipment to be operable bu 790323 ui/ 
iception of unit described in end, End withheld (ref 
10CFR2. 790), 
WIL-LIAH9, D. H. Arkansas Power (t Light Co. 79/O2/01. Ip. 



79022B0461 DOCKET 50-368 Arkansas Nuclear One, Unit 2 

Forwards IE Bulletin 79-O1, "Environ Qualification of Class 

IE Equipment." W/list of 11 systematic evaluation program 

plants for which no action is required. 

8EYFR1T,K.V. Region 4, Dallas. Office of the Director. 79/03/08, 



7902330016 DOCKET 3Q-36B Arkansas Nuclear One, Unit 3 
Forwards IE Info Notice 79-03, "Limitorque Valve Geared 
Limit Switch Lubricant. " 

8EVFRIT, K. V. Region 4, Dallas, Office of the Director, 
Ip. 



79/02/09. 



DOCKETED ITEMS 



101 



7902220073 DOCKET 50-36B Arkansas Nuclear One. Unit 2 
Forwards monthly operating rept for Jan If 71. 
BUGTER.D.A. Arkansas Pokier !< Light Co. 79/O2/13. Ip. 

7902220107 DOCKET 5O-368 Arkansas Nuclear One, Unit 2 
Monthly operating rept for Jan 1979. 
EHIVELY-C. N. Arkansas Power t. Light Co. 79/02/13. 5pp. 

7902030112 DOCKET 50-369 Arkansas Nuclear One, Unit 2 
Forwards LER 7B-033/O3L-0 t< LER 79-034 /03L-0. 
WILLIAMBiD. H. Arkansas Poorer tc Light Co. 79/01/29. Ip. 

7903030116 DOCKET SO-36H Arkansas Nuclear On. Unit S 
LER 7B-033/03L-0 on 7B123Q: during Mode 3 op era t ion, "C" 
containment bldg pressure transmitter failed to 6O psia. uj/no 
consequences. Failure appears Isolated. 
BHIVELYiC.N. Arkansas Pouier & Light Co. 79/01/39. Ip. 

7902050120 DOCKET 30-3AB Arkansas Nuclear One, Unit 2 

LER 7B-034/03L-0 on 701230: during Mode 3, all control element 
aisemblles fully inserted, d signal leads from upper . lourer 
detector chambers of "0" linear safety channels found to be 
swapped. Chamber leads were reconnected correctly. 
EHIVELY.C.N. Arkansas Power & Light Co. 79/O1/29. Ip. 



790SOS0172 DOCKET 50-369 Arkansas Nuclear One, Unit 3 
Foruards LERs 79-OO1/031.-0 & 79-002/03L-0. 
WILLIAM^." H Arkansas Power i, Light Co. 79/01/31. 



79&213019B DOCKET 5Q-3tB Arkansas Mud-ear One, Unit 2 

LER 7-9-OO7/O3L-Q on 79O11X dur ing pouer escalation test, 
control Element assembly position as received by core 
protection computer "D " was inc nrrec t. Cautffd by bad 
mult ip leier cardiuhlch uas replaced. 
BH1VELY, C.M. Arkansas Power & Light Co. 79/O2/09. Ip. 

7902130196 DOCKET S0~3fi8 Arkansas Nuclear One, Unit 2 

LER 79-O09/03L-Q on 79O13I : during pouer escalation testing, 
reactor protection sys Channel "C" trip -path solid state 
relay fa i lad. open Ing reactor trip path circuit breakers 3 S. 
7 Flelag was rep lac pd>ui thin 4-h circuit breakers closed. 
SH1VELV.C.N. Arkansas Power t< Light Co. 79/02/O9. lp. 

79Q222O01i DOCKET 3O-36B Arkansas Nuclear One, Unit 2 
Formardo LER 79-O1B/O3L-0 
RUETEfl, O.A. Arkansas Foyer J. Light Co. 79/02/14. Ip. 

7902B2QO20 DOCKET 3O-36B Arkansas Nuclear One. Unit 2 
LER 79-01B/O3L-0 on 79011S: engineered safety features 
actuation sys auiiliariji control cabinet 2c-39, bays t t. a 
pouier supply breakers from 2RS-3 wore Dp en. Croakers reset to 
meet Tech Spec requirements. 
SHlVELYjC.N. Arkansas Power & Light Co. 79/03/lfl. lp- 

7902280283 DOCKET 3O-36B Arkansas Nuclear Dnn, Unit 2 
Foruards LERs 79-D1O/O3L-0 t, 79-017/03L-0. 
RUETEft.D.A. Arkansas Power !< Light Co. 79/O2/32. Ip. 



IP. 



79020B0174 DOCKET 50-3&B Arkansas Nuclear One, Unit 2 
LER 79-001/Q3L-0 on 79O102: rat ueling uotar tank level 
indicator failil high. Caused by Proien transmitter sensing 
line. Line uas thawed d returned to operable atatut within 

ao-h. 

BHIVELY.C.N, Arkansas Pounr b Uight Co. 79/01/31. Ip. 

7902080177 DOCKET 50-343 Arkaniass Nuclear One, Unit & 

LER 79-002/03L-0 on 79O103: reP.uEl ing muter level transmitter 

rffron. Causoi by Proien transimi tter sensing lino. Atfdl 

insulation & hat lamps added to sensing lines I. transmitter 

canlnits. 

BHIVELYi.C. N, Arkansas Pouier J< Light CD. 79/01/31. Ip. 



79Q22B02B9 DOCKET 50-3&B Arkansa.s Nuclear One, Unit 2 

LEU 79-01O/03L-O on 7901S4; pump discharge valvep 2CV-5i6ii7-2j 

stroked fully open but immad lately rec 1 nseil Caused by 

nod ium-hydroi id e tank low lev&l alarm * indication circuit 

being out of alignment. 

SHIVEt-Yr C. N. Arkansas Poiuer h Li^ht Co. 79/02/22. Ifh. 



79022B0394 DOCKET 50-36B Arkansas Hue lear . One, Unit S 

LER 79-017/03L-0 on 790201 : boric acid makeup tank level 
belou Tech 9pec min. Caused by equal 1 jatlon of boric acid 
both tanks. 
EHIVELY.C.N, Arkansas Power & Ligtit Co. 79/02/23. Ip. 



790B130160 DOCKET SO-3iiB Arkansas Nuclear One. Unit 3 

Forwards LERi 79-004/03L-0, 79-OO3/03L-O. 79-006/G3L-O, & 
79-OOB/03L-0. ___ , 

RUETEHiD.A. Arkansas POUIDP & Light Co. 79/O2/07. 2pp. 

7902130162 DOCKET 50-3iH Arkansas Nuclear Qnai Unit S 

LER 79-OQ4/03L-0 on 790107: during pouier escalation testing* 
both tontrol element assambly clusters declared inoperabla. 
Caund by weak rtied switch position transmi tter jioucr 
tupp l y< 
SHIVELY.C.N. Arkansas Paiuer- t Liglit Co. 79/OS/O7. Ip. 



7902130169 DOCKET 30-36B Arkansas Nuclear One. Unit 2 
LER 79-OOS/03L-0 on 7901O9: during power escalation t 
bistable primary power system 4 "C" failedh rendering 
pr"Buriier loui pressure trip inoperable. 
SHIVELYiC.N. Arkansas Power a Light Co. 79/O3/07. 



Ip. 



790ai301iB DOCKET tSO-368 Arkansas Nuclear Qnai Unit S 

LER 79-006/03L-0 an 7901 09; during ooiuer escalation testing, 
"B" core protection computer declared inoperable uhen low 
presiurlier pressure trips received. Invasbisatitm showed 
ground fault relays Pall out on lou bus voltage. 
fiHlVELV.C.N. Arkansas Pouier f< Light Co. 79/02/O7. Ip. 

7902130169 DOCKET 50-36S Arkansas Nuclear One, Unit 2 

LEU 79-009/03L-0 on 7901 14; during power ascension testing-, 
refuelinj uater tank levsl transmitter. EL T-S439-3i oensinff 
line froie due to temporary heat lamp burnout. 
SHIVELYiC. N. Arkansas Power f- Light CD. 79/O3/07, Ip. 

7902130432 DOCKET 30-36B Arkansas Nueloar One. l/nit 3 

LER 7B-Q31/03L-0 on 7HI207: failure to perform semiannual 
surveillance on triaiial response-spectrum recorders 
HXR-B3BO as scheduled on 7B100S. Coused by personnel error. 
BHIVELYiC.N. Arkansas Power S. Light Co. 79/03/08. Ip. 



790213018S DOCKET 30-36B Arltaintas Nuclear One, Unit 
Foruards LER 79-007/C-3L-0 & LER 79-009/03L-0. 
RUETERiD.A. Arkansas PoyBr It Light Co. 79/02/09. 



it- 



79OSa7OE79 DOCKET 5O-36B Arkansas Nuclear One, Unit 2 
Forwards LER 79-01 1 /03L-0. 
RUETER.D. A. Arkansas Pouier (< Light Co. 79/02/23. Ip. 

7903270SBO DOCKET 50-36O Ar^nnaas Nuc 1 e^ar Dne, Unit 3 

LEU 79-011/Q3L-0 on 7^0I33: dur ing puuier escalation, Chnmiol 
"B" cor* protection compute-r f ai led , reniil titifl in departure 
from nucleate boiling ratio l> linear pouier density trips. 
Caused bg movament o* temporary cables tannetted to "B". 
BH1VELV.C. N. Arkansat Power t Light Cn. 79/O3/23. Ip. 

79020903B3 DOCKET 50-369 William B. MlGuire Nucloar Station, Unit 1 
Requests further justification for withholding one test 
procedure & tuio test ropts.or they will be released on 
790217. FoTuiards model affidavit. 
BAER. R.L. Light Water Reactors Branch 2. 79/01/17. i-pp. 

7902060227 DOCKET 50-369 William B, McOuir-e Nuclear Station. Unit 1 
ForurardB revised table summariiing 8ismlc nual if ication 
requirements of electrical equipment for facility. 
PARKER, H.O. DifkB Pomer Co. 79/01/31. 7pp. 

79O222Q220 DOCKET 50-369 William D. McOuire Nutlcar Station, Unit 1 
Acl -receipt of 7H121B Itr u/draft radiological effluent 
Tech Specs. Info unsatisfactory because it dSsmisseE 
requirements far oiaste solidification Tech Bfna E, fot' 
prot&ss control program. 
BAER, Fl. L. Light Water Reactors Branch S, 79/02/07. 3pp. 

7902030205 DOCKET 50-369 William D, McOuire Nuclear Station, Unit 1 
Forward! revised rept "McOuire Nuclear Pouer Station Fire 
Protection Review. " Original rept submitted Sept 1977. 
Revlieil rept reflects changes it commitments made as result 
of NRC TVifiu. 
PARKER. H. 0. Duk* Power C-o. 79/01/31. Ip, 

790205020B DOCKET 90-369 William D. McOuire Nuclear Station, Unit 1 
Revised "McSuire Nuclear Station Fire Protection Review, " 
Proposes to implement otanilbif shutdown sys which ul 1 1 
provide Addl means of maintainin-g unit in hot standby 
cand i t ion. 
Duke Pciuer Co. 79/O1/31. 153pp. 



102 

7901330374 DOCKET 5O-369 William D. 
Supp 1 order ruling" on petitions t 
intervention by NJIDC (, NC PIHG 
LftZO, i. M. Atomic Safety and Lite 



DOCKETED ITEMS 



McQuire Nuclear Station, Unit 1 



13 Be 



Sip p. 



7902090137 DOCKET 30-369 William D. McGulre Nuclear Station, Unit 1 
Forwards NRC evaluation of safety factors against buckling 
of steel containment structures. !< investigation bij NRC 
consultant. Appl leant 'E design criteria provides acceptable 
margins against specified loads. 

KETCHEN.E-0. Office of the Eiecutive Legal Director. 79/01/03. 
3pp. 

79O2Q901BB DOCKET 50-367 William H. McGuire Nuclear Station, Unit 1 
Notification of receipt of progress rept questioning current 
crltiria.for buckling of steel containment shells. Rept may 
have impact on design of steel containments of BUR Mark III 
& PHR ice-condensers. Requests that ASLB !, ACRS be notified. 
SIHWEIL. 1. Structural Engineering Branch. 73/01/30. Ip, 

7903070169 DOCKET 50-369 William H. McQuire Nuclear Station- Unit 1 
Forwards first progress rept re evaluation of buckling 
design criteria for steol containment shel It. Study of 
static !< dynamic loading conditions to uhich containment 
shell ifi subjected uitl he completed shortly. 

MASK I > A. F International Structural Engineers, Inc. 7B/01/11. 
Bpp. 

79Q2030056 DOCKET SO-369 William D. McOuire Nuclear Station. Unit 1 
Foruiards Info on uedge model uitid speed parameter t< 
population density model used in NRC Rn-222 assessment, as 
requested at 7BOB30 hearing. 

HOEFLINQ.R. K. Office of the Eecutive Legal Director. 79/01/O4. 
14pp. 

790U90255 DOCKET 50-369 William B, McOuire Nuclear Station, Unit 1 
Forwards NUREG/CR-0400. "Risk Assessment Revieu Group Rept to 
the US NRC" to parties of proceeding. NHC daveloping policy 
statement re ropt. 
KETCHEN.E. G. Office of the Eiecutive Legal Director. 79/01/11. Ip, 



7902020034 DOCKET SO -369 William D. McOuire Nuclear Station, Unit 1 
Acfc receipt of IE Insp Rept 50-369/7B-39 on 781107-09,13-13. 
No proprietary info. 
PARKER, W. D. Duke Power Co. 79/O1/1B. Ip, 

7902030037 DOCKET 30-36? William D. McGuire Nuclear Station, Unit 1 
Forwards IE Insp Kept SO-369/7B-39 on 7B1 107-09, 13-1S. No 
noncompliance noted. 

LONG, F. J. Region 3i Atlanta, Reactor Operations Nuclear Support 

Branch, 79/01/13. 2pp. 

77O3020046 DOCKET 50-369 William D. McQuire Nuclear Station, Unit 1 
IE Insp Rcpt 30-369/78-39 on 7B1 107-09, 13-13. No 
noncompliance noted. Ma jor areas inspected: QA/OC 
administrationi QA audit program, document controli maint, 
design changes, procurement control, records ti eiperiments. 
ASHENDEN,M. C. , JENKINS, H. D. . KELLOOQ.P.J. Region 2, Atlanta, 

Reactor Operations Nuclear Support Branch. 7B/13/32. H4pp, 

7902060406 DOCKET 3O-369 William D. McOuire Nuclear Station, Unit 1 
Ac k receipt of 7901 IB 1 tr informing NftC of (taps taken to 
correct violation noted in IE Inup Rapt 30-369/79-12. 
LEWIS. R. C. Region 5, Atlanta, Reactor Operation! Nuclear Support 

Branch. 79/01/3O. Ip. 

7703060456 DOCKET 50-369 William D. McOuire Nuclear Station, Unit 1 
Responds to NRC 731326 I tr re violations noted in 16* Imp 
Rept 50-369/79-12. Corrective actions: future maint of Level 1 
cleanliness during reactor vessel head removal , battery room 
doors posted as Level 4 cleanliness areas. 
PARKER, H 0. Du*e Poiuer Co. 79/01/1B. 3pp. 

7902040429 DOCKET 50-369 William B. McGwire Nuclear Station, Unit 1 
Foriuardi IE Insp Rept 50-369/7B-42 on 7B1209-OB tt notice of 
via 1 ation, 

LDNBiF. J. Region 2, Atlanta, Reactor Operations Nuclear Support 

Branch. 7B/15/&6. Spp, 

7902060431 DOCKET 50-369 William D. McOuire Nuclear Station, Unit 1 
Holies of violation from insp on 7B12O5-OH. 

* Region 3, Atlanta, Reactor Operations Nuclear Support Branch. 

7B/12/2&. Ip. 



7902060236 DOCKET 90-369 William B. McOuivfl Nuclear Station, Unit 1 
Responds tn 7H0426 question*. Forwards requeats for relief 
from A8ME Section XI.ClaBS I & Class II requirements. 
Withdraws requests for relief MC-1-014 t, MC-1-013 dtd 
7S0724, since there aro no welded Class I supports. 
PARKER, W.O. Duke Fouler Co. 79/03/01. 36pp. 

7902230490 DOCKET 30-369 William D. McOuire Nucloor Station, Unit 1 
Ack receipt of IE Inap Rept 50-369/7H-41 on 7B1211-1S. No 
proprietary Info. 
PARKER, W. 0. DukB Pouier Co. 79/03/01. Ip. 

7902280491 DOCKET 90-369 William B. McOuire Nuclear Station, Unit 1 
Forwards IE Inap Rapt 90-369/78-41 on 781311-13. No 
noncompl iance noted. 

SUTHERLAND, J. T. Region 2, Atlanta. Fuel Facility Sc Materials 

Safety Branch. 79/01/1O. 2pp. 

79022Q0452 DOCKET 5O-369 William D. McQuire Nuclear Station, Unit 1 
IE Inap Rept 50-369/78-41 on 781311-19. No noncomp 1 lance 
noted. Major areas inspec ted: potentially contaminated air 
streams, vol determination of waste oaa tank*, design basis 
of stark sampling probe 6 ventilation sys. 

'MILLSAP.W. J. - ZAvADOSKI.R.W. , OIBSON, A. F. ReaionB, Atlanta, 

Fuel Facility & Materials Safety Branch. 79/01/09. 7pp. 

7902260297 DOCKET 30-369 William D. McOulre Nuclear Station, Unit 1 
Forumrda IE Info Notice 79-01, "Dergon-PaterBon Hydraulic 
Shock & Sway Arrestars <HSSA). " 

O'REILLY, J. P. Region 3, Atlanta, Office of the Director. 

79/02/02. 9pp. 



7902260903 DOCKET 50-369 William D. McOoire Nuclear Station, Unit I 
Forwards IE Bulletin 79-01, "Environ Qualification of Clais 
IE Equipment." W/liat of 11 ayatematlc evaluation program 
plants far which no action is required. 

O'REILLY, J. P. Region 2. Atlanta, Office oP the Director. 

79/02/OB. 2pp. 

7902aB009B DOCKET SO-367 William D. McOuire Nuclear Station, Unit ( 
Forwards IE Info Notice 79-03, "Llmitorque Valve Ooarei) 
Limit Switch Lubricant. " 

O'REILLY, J. P. Region 3, Atlanta, Office of the Director. 

79/02/09. 2pp. 

7902090383 DOCKET 50-370 William B. McOuire Nuclear Station, Unit 2 
Requests further justification for withholding one teat 
procedure & two test rapti,ar they will be mlaaaed on 
790217. Forwards model affidavit. * 

BAER,R.L, Light Water Heactora Branch 3. 79/O1/17. 6pp. 

7902060227 DOCKET 50-370 William D. McOuire Nuclear Station, Unit Z 
Forwards revised table summarliing seismic qualification 
requirements of electrical equipment for facility. 
PARKER, W. 0. Duke Pouer Co. 79/01/31. 7pp. 

7903130139 DOCKET 90-370 William D. McOuire Nuclaar Station. Unit 3 
Requests approval of Metal Dcllous Corp 7964B. 73743. 75649 li 
79632 flexible hose components for UB In sf ety-rBlatedi 
piping const. Buppl data demonstrating compliance u/Cade ti 
Rag Guide conditions encl. 
PARKER, W. 0. Duke Poyev Co. 79/01/31. 76pp. 

7902090205 DOCKET 50-370 William fl. McOuire Nuclaar Station. Unit & 
Forwards revised rept "McOuire Nuclear Power 8ttlon Flro 
Protection RevlBtii. " Original rept submitted Bapt 1977. 
Revised -rept reflects changes Ii commitmints made as result 
of NRC review. 
PARKER, W. 0. Duke Pouter Co. 79/01/31. Ip. 

79020S020B DOCKET 50-370 William B. McOulre Nuclear Station, Unit 
Revlaed "McOulre Nuclear Station Ftri Protection Review." 
Proposes to implement atandby shutdown sys which uill 
provide addl means of maintaining unit In hot ttandbij 
condition. 
DuVe Poiunr Co. 79/01/31. 133pp. 



79011902B5 DOCKET 30-370 William E. KcOulre Nuclear Btattom Unit S 
Forwards NUREO/CR-0400, "Risk Anassment Reviau Droup Rept to 
ths US NHC" to parties of proceeding. NRC developing pollcu 
statement re rapt. 
KETCHENiE.Q. Office of the Executive Legal Director. 79/01/11. 



7903060433 DOCKET 50-369 William B, McOuir* Nuclear Station, Unit 1 
IE Insp RBpt SO-369/7B-42 on 7SIBOS-Oa, Noncompliance noted: 
reactor vessel head removed. stored & replaced w/o 
application of Level 1 cleanliness requirement, essential 
battery room not posted as Level 4 cleanliness area. 
COTTLE.W.T-, LEWIS.R.C. Region 2, Atlanta, Reactor Operations 

Nuclear Support Branch. 76/12/26. 7pp. 



790122D374 DOCKET 90-370 William B. McOulre Nuclear 8 tat ion, Unit 8 
Buppl order ruling on petitions to Intervene denying 
Intervention by NRDC & NC PIfiO. 
LAID, R. M. Atomic. Safety and Licensing Board Panel. 77/O1/09, 26pp. 



DOCKETED ITEMS 



103 



79020901B7 DOCKET 80-370 William B. McQuire Nuclear Station, Unit 3 
Forward* NRC evaluation of safety factors against buckling 
of steel containment structures, & Invest 1 jation oy NRC 
consul tant. App 1 leant 's design criteria provides acceptable 
margin* against specified loads. 

KETCKEN.E.O, Office of the Executive Legal Director. 79/01/03. 
3pp. 

7903030086 DOCKET 50-370 Hilllam B. MeOuire Nuclear Station. Unit 2 
Forward i Info on wedge modal wind speed parameter 8< 
population density, model used In NRC Rn-233 assessment, an 
requested at 7BQ830 hearing. 

HOEFCINQ.fi. K. Office Of thn Eieeutlvo Legal Director. 79/01/O4. 
14pp. 

7903060336 DOCKET 90-370 William D. McQulre Nuclear Station, Unit 3 
Responds to 7B0426 questl ons. Forwards requests for relief 
from ABME Section XI. Class I & Class II requirements. 
Withdrawn requeiti for relief MC-1-014 b MC-1-015 dtd 
7B0724, since there are no molded Class I support*. 
PARKER, W. 0. Duke Power Co, 79/02/01. 36pp. 



7902270362 DOCKET 30-373 LaBalle Countg Station, Unit 1 

Forwards info re applicant's position on NUREQ-0487. open 
Issues concerning Mark II containment program, t< lead plane 
load acceptance criteria In response to NRC 790S03 Itr.. 
DELGEGRQE. t. 0. Commonwealth Edison Co. 77/02/33. 4pp. 

79021S033B DOCKET 50-373 LaSalle County Station, Unit 1 

Requests addl financial info to continue review of facility 
FBAFi. Cunural & financial portions of application should be 
amended to reflect addl info as specified in end. 
PARR.O. D. Light Hater Reactors Branch 3. 79/01/29. 7pp. 

7902230186 DOCKET 50-373 LaSalle County Station, Unit 1 
Forwards 1978 Annual Rept for util, 
BRESEMANN, R. U. Commonwealth Edison Co. 79/02/1S. lp. 

7902230194 DOCKET 30-373 LaSalle County Station, Unit 1 
197B Annual Rapt. Reviews 197B, five year summary of 
operations !. mgt. t finanical statement. 
Commonwealth Edison Co, 78/12/31. 24pp, 



79022009=2 DOCKET 50-370 William B. McQuire Nuclear Station, Unit 2 
Forwards IE Bulletin 79-01, "Environ flualif Icatlon of Class 
IE Equipment." W/llst of 11 systematic evaluation program 
planti for which no action Is required. 

Q'REILLV. J.P. Region 2, Atlanta, Office of the Director. 
79/O2/OB, 2pp. 



7902210240 DOCKET 30-373 LeSallo Countg Station, Unit 1 

Foruardi Amend 115 to Indemnity Agreement NF-43, Amend 97 to 
MKF-22. Amend 36 to NF-1B7. Amend 17 to MF-34, Amend 49 to 
NF-201, Amend 39 to MF-61, t Amend B to NF-353 for calendar 
gear 1979. 
OBTEfi.J. Commonwealth Edison Co. 79/03/14, 0pp. 



7902280098 DOCKET 30-370 Ui Ilium D. McOuire Nuclear Station, Unit 2 
Forward! IE Info Notice 79-03, "Limitorquo Valve Geared 
Limit Quitch Lubricant. " 

O'REILLY, J, P. Region 3, Atlanta, Office of the Director 
79/03/09. 2pp. 

7902130479 DOCKET 50-373 LaSall* Countg Station, Unit 1 

Requests that Llctn.es SNM-1B02 fc 1833 be amended to alloui 
for max U-333 enrichment of 3. 0837.. Regard* change as 
Inilgnlf leant. 
DELOEQROE. L. D. Commonwealth Edlion Co. 79/01/15. 2pp. 

7902010340 DOCKET 90-373 LaBal le' Countg Station, Unit 1 

Foruardi Hit of outstanding inues In SER inputs re plant. 
Identified ilnco 781821, No inputt yet received from CIA or 
Instrumentation t control. Inues re reactor sgs could change 
in final version. 
PAflfl.Q. D. Light Mater Reactors Branch 3. 79/01/23. 7pp. 

7902030009 DOCKET 90-373 LaSalle County Station, Unit 1 
Hut ice of poitponement until further notice of 790131 
meeting u/util to dlicuis open Items on Initial teit 
program. 
BOURNIA.A. Light Water Rune tort Branch 3, 79/01/24. lp. 



79020B0290 DOCKET 80-373 LaSalle Countg Station, Unit 1 
Announce! 790313-14 meeting Bi/Mark II owners group to 
riiicuiB LOCA & tafetg relief valvi pool dynamic loads. 
ANDERSON, C. J. Containment Bu*temi Branch. 79/01/24, 



Hpp. 



7902190463 DOCKET 30-373 LaSalle Countg Station, Unit I 

Req.utiti addl info re Amend 40 to FBAR ri Sections IIIA, I1IB 
fa IVB of App h Section! IIB 8, IIC1 of App H of 10CFR30. 
Ouidinca incl, 
PAfiR.D. D. Light Water Reactori Branch 3. 79/01/29. 5pp. 



7902260032 DOCKET 30-373 LaSalle County Station, Unit 1 

Forward! Amend 42 to FSAR, transmitting response to IS second 
round questions It voluntary teit ( response revisions. 
REED. C. Commonuiealth Edison Co. 79/03/16. lp, 

7903240036 DOCKET 50-373 LaSalle County Station, Unit 1 
Proposed Amend 43 to F8AR, Responds to NHC second round 
questions. W/woluntary teit & responsa revisions b 16 
oversiie drawings. Drawings available In Central Files. 
* Commonwealth Edison Co. 79/03/16. 271pp, 

7902270349 DOCKET 50-373 LaSalle County Station, Unit 1 
Forwards affidavit certifying that FSAR Amend 13 has been 
distributed in accordance ui/OD Parr 770326 Itr. 
DELOEOnOE, L. D. Commonwealth Edison Co. 79/03/23, 3pp. 

7902310031 DOCKET 30-373 LaSalle County Station, Unit 1 
Lists project reviews for neit five ACRB full committee 
meetings. 
CROCKER. L. P. Division of Project Management. 79/O2/05. 3pp. 

79020Q0146 DOCKET 90-373 LaSalle County Station, Unit 1 
Forwards IE Insp Repts 30-373/78-84 b 30-374/70-13 on 
7B1011-13.NO noncompllance noted. 

HEIBHMAN, R. F. Region 3, Chicago, Renctor Construction fc 
Enflineerlng Support Branch. 7B/12/01. 2pp, 

79020 BO U9 DOCKET 50-373 LaSalle County Station, Unit 1 

IE Insp Repts 30-373/7B-H4 ft SO-374/78-1S an 7B1011-13. No 
noneompllonce noted. Major areas inspected: containment 
prestressing, reactor internals, safetg-ralatedl component* 
electrical cables ti electrical procedures, 

PHILLIPS, H, a. , MAXWELL, 0. F, , HAVES, D. H. fleoionS, Chicago, 
Office of the Director, 78/11/29. 9pp. 



790S1504BO DOCKET 30-373 LaBille Count Station, Unit 1 

Hequviti Info on Mark II lead plant load acceptance criteria 
at discussed in NUREO-04B7 & on pool dynamic concerns by 
790209. Info includes pool swell evaluation t> uetuall, small 
structure Impact loads b aiymmetric pool swell loads. 
PARR.O.D. Light Water Reactors Branch 3. 79/01/29. 9pp. 



7902270164 DOCKET SO-373 LaSfllle Countg Station Unit 1 
Forwards IE Insp Repts SO-373/7B-29 b 30-374/7B-16 on 
7B1104-09 b notice of violation. 

HEiaHMAN.R, F. Region 3, Chicago, Reactor Construction & 
Engineering Support Branch. 78/12/23, 2pp. 



79022B0331 DOCKET 80-373 LaSalle Countg Station, Unit 1 

NatlMx of 790213 meeting In Bethesda, MD w/util re seismic 

design, 

BOURNIAtA, Light H*tir Reactors Branch 3. 79/01/30. 2pp, 



7903270169 DOCKET BO-373 LaBal la County Station, Unit 1 
Notice of violation from Insp on 7B1106-09. 
HEIBHMAN, Fi. F. Region 3, Chicajo, Reactor Construction 
Enoinaerlng Support Branch. 7S/12/23. 3pp, 



7902090367 DtKKET BO-373 LaBalle Countg Station, Unit 1 

Buppl 2 "Basil for Criteria for Combination of Earthquake & 
Other Transient Responses By the Square-Root-Sum-of-the- 
Squares Mtthnd. " Discusses method for combining multiple 
peak dynamic responses for blasts & earthquakes, 
KENNED ViR.F. Oeneral Electric Co.iNuclear Energy Products Dlv. 
hEDO-24010-2. 7B/12/31. 30pp. 



7903270173 DOCKET 50-373 LaSalle Countg Station. Unit 1 
IE Insp Repts 30-373/78-23 & 30-374/78-16 on 7B1106-09. 
Noncompllancs noted; inadequate specs for procuring 
mechanical snubbers, inadequate installation & GC insp 
procedure for hangers & snubbers. 

YIN, l.T. Region 3, Chicago, Reactor Conitructlon d Ennineerlnc 
Support Branch. 78/12/15, ?pp. 



790328030S DOCKET 30-373 LaSalle Countg Station, Unit 1 

Respond* to 790119 request for addl documents on scheduling 
at facility, Forwards 13 pages of documents. Search is not 
canplettdVM/a end. 
FELTON.J. H, Division of Rules and Records, 79/02/06. lp. 



7903010S93 DOCKET 50-373 LaBal U Countg Station, Unit 1 
Forwards IE Insp Repts 30-373/7H-27 & 50-374/78-19 on 
7B110B-0?. No noncompllanca noted. 

DAvIBiA.B. Region 3, Chicago, Fuel Facility !. Materials. Safetg 
Branch. 78/ 1H/B3. 2pp. 



104 



DOCKETED ITEMS 



790201.0394 DOCKET 90-373 LaSalle County Station, Unit 1 

IE tnsp Repts 50-373/78-37 !, 50-374/7B-19 nn 7B110B-09. No 
noracomp 1 1 ance noted. Major areas inspected: rad iation 
protection 6 raduasts mgt programs. organi lat ion, rad iation 
protoctlnn procedures !. respirator!) program. 

MILLER, D.E., FISHER. W. L Region 3, Chicago, Fuel Facility & 

Materials Safety Branch. 75/13/19. 3pp. 

79020903B7 DOCKET 50-373 LaSalle County Station, Unit 1 
Forwards JE Insp Repts 50-373/7B-29 t. 30-374/7B-21 on 
7B1109-9 & notice of violation. 

HEISHMAN, H. F. Region 3. Chicago, Rsattor Construction L 

Engineering Support Branch. 76/12/26. 5pp. 

7903090360 DOCKET 50-373 LaBallo County Station, Unit 1 
Notice of violation from tnsp on 7BI 108-0?. 

Beglon 3, Chicago. Reactor Construction It Engineering Support 

Branch. 7S/12/IB. Ip. 



79031904BO DOCKET 50-374 LaSalle County Station, Unit 3 

Requests info on Mark II lead plant load acceptance criteria 
as discussed in NUREQ-04B7 t. on pool dynamic concerns by 
790209. Info includes pool suiell evaluation & uiBtuisl 1, imal 1 
structure Impact loads & asymmetric pool sue 1 1 loads. 
PARR.O.D. Light Mater Reactors Branch 3 . 79/01/H9 9pp, 

79022B0331 DOCKET 30-374 LaSalle County Station, Unit S 

Notifies of 790213 meeting In Bethesda.MD y/util re seismic 

design. 

BQURNIA,A. Light Water Reactors Branch 3. 79/01/30. 3pp. 

7903090343 DOCKET SO-374 LaSallo County Station. Unit 2 
Forwards QE Topical Rept NEDO-34010-3, Supp 1 2. "Bases for 
Criteria for Combination of Earthquake & Other Transient 
Responses bg the Square-Root-Sum-Of-The-Squares method. " 
Rapt is provided on behalf of Mark 2 Owner's Group 
BOBON. L. J. General Electric Co. , Nuclear Energy Products Dlv. 
79/02/05. Ip. 



79020903B9 DOCKET 50-373 LaSalle County Station, Unit 1 
IE Insp Repts 30-373/78-29 t. 30-374/7B-2! on 7B110B-9. 
Nonccinp 1 lance noted: reactor mater level Instrumentation pipe 
mas connected to urong instruments. 

BARRETT.P. A. , 5PES8ARD. R. L. Region 3, Ch icago, 'Reactor 

Construction b Engineering Support Branch. 7B/1S/1B. 3pp. 

7903380471 DOCKET 5O-373 LaSolle County Station, Unit 1 
Act receipt of 790123 Itr informing NRC to steps taken to 
correct violations noted in IE insp rept. 

HEISHMAN, R. F. Region 3, Chicago, Reactor Construction Ic 

Engineering Support Branch 79/02/01. Ip. 

790212QOS4 DOCKET 50-373 LaSalle County Station, Unit 1 
Forwards IE Info Notice 79-01, "Bergen-Faterson Hydraulic 
Shock t. Smay Arresters (HSSA1". 

KEPPLER, J. 0. Region 3, Chicago. Office of the Director. 79/02/03. 

1pp. 

7903210330 DOCKET SO-373 LaSalln County Station, Unit 1 

Forward 4 IE Bulletin 79-O1, "Environ Qualification of Class 
IE Equipment." W/list of 11 systematic evaluation program 
plants for which no action is required. 

KEPPLER, J. 0. Region 3, Chicago, Office of the Director. 79/03/09. 

Ip, 

79Q337OS52 DOCKET 30-373 LaSalle County Station, Unit 1 
Forwards IE Info Notice 79-03, "Llmitorque Valve Oeared 
Limit Switch Lubricant," 

KEPFLER, J.'Q. Region 3, Chicago, Office of the Director, 79/02/09. 

Ip. 

7902060267 DOCKET 50-373 LaSalle County Station, Unit 1 
Final rept, per 10CFFI5O. SSI a ) , f or possible safety/relief 
valve control deficiency, supplementing 771111 Itr. Results of 
plant unique analysis presented in Design Assessment Closure 
Rapt. Had a f closing setpoints to be Implemented In future. 
DELQECRGE, L. 0. Commonweal tfi Edison Co. 79/01/30. 3pp, 

7903130-179 DOCKET SO-374 LaSalle County Station, Unit .1 

Hoque'sts Chat Licenses SNM-18Q3 & 1B33 be amended to alloui 

for mat U-335 enrichment of 3. 095'/.. Regards change as 

Insignificant, 

DELCEDRSE, L. 0. Commonweal th Edison Co, 79/01/15. i!pp. 



7902010365 DOCKET 50-374 LaSalle Countu Station, Unit 2 

Forwards list of outstanding issues in SER inputs re plant, 
identified since 7B 1321. No inputs yet received from QA or 
instrumentation ! control. Issues re reactor sys could change 
in final version. \ 

PARR-O.D. Light Hater Reactors Branch 3. 79/01/22. 7pp. 



7903030009 DOCKET 30-374 LaSalle County Station. Unit S 
Notice of postponement until further notice of 79O131 
meeting w/utll to discuss open items on initial test 
program. 
BCHJRNIA.A. Light Water Reactors Branch 3. 79/01/24. Ip. 



7905090367 DOCKET 30-371 LaSalle County Station. Unit 2 

Suppl 2 "Basis for Criteria for Combination of Earthquake b 
Other Transient Responses By the 8quare-Root-Sum-of -tho- 
Squares Method." Discusses method For combining multiple 
peak dynamic responses for blasts & earthquakes. 
KENNEDY, R,P, General Electric Co, .Nuclear Energy Products Div. 
NEDO-34010-2. 7B/12/31. 30pp. 

7902260302 DOCKET 90-374 LaSallo County Station. Unit 3 

Responds to 790119 request for addl documents on scheduling 
at fac 1 1 i ty. Forwards 13 pages of documents. Search is not 
completed. U/o encl. 
FELTON.J.M. Division of Rules and Records. 79/02/06. Ip. 

7902270363 DOCKET 50-374 LaSalle Countu Station. Unit 3 
Forwards info re applicant's position on NUREQ-04B7, open 
issues concerning Marli II containment program, & lead plant 
load acceptance criteria in response to NRC 790202 Itr.. 
DELQEORQE, L. 0. Commonwealth Edison Co. 79/OS/23. 4pp. 

7902130338 DOCKET 90-374 LaSalle County Station, Unit 2 

Requests addl financial info to continue review of facility 
FBAR. General tt financial portion* of application should be 
amended to reflect addl info , as specified In encl. 
PAHR.O.D. Light Water Reactors Branch 3. 79/01/S9. 7pp. 

790B2301B6 DOCKET 5O-374 LaSalle County Station, Unit 2 
Forwards 1978 Annual Rept /or util, 
nRESEMANN, R. W. Commonwealth Edison Co. 79/O2/15. !p. 

7902230194 DOCKET 50-374 LaSalle County Station, Unit 3 
197B Annual Rept. Reviews 1976, five gear summary of 
operation* & mgt, & flnanical statement. 
* Commonwealth Edison Co. 76/12/31. 24pp. 

7903360033 DOCKET 30-374 La Balls County Station, Unit 3 

Forwards Amend 42 to FBAR. transmitting response to IS second 
round questions t. voluntary tout t. response revisions. 
REED.C. Commonwealth Ediion Co. 79/02/16. Ip. 



790S260036 DOCKET 30-374 LoSalle Countu Station, Unit 2 
Proposed Amend 42 to FBAR. Responds to NRC second round 
questions. W/voluntaru text & response revidons It 16 
overslie drawings. Drawings available in Central File*. 
* Commonwealth Edison Co. 79/03/16. 371pp, 

7902270319 DOCKET 30-374 LaSalle County Station. Unit S 
Forwards affidavit certifyina that FSAR Amend 42 has been 
distributed In accordance w/OD Parr 770526 Itr. 
DELGEORGE, L. 0. Commonuealth Edison Co. 77/02/23. 2pp. 

7902210031 DOCKET 50-374 LaSalla Countu Station, Unit 2 
Lists project reviews -for net five ACRB Full committee 
meetings. 
CROCKER. (,. P. Division of ProjBCt Management, 79/02/05. 2pp. 



7902090290 DOCKET 50-374 LaSalle County Station, Unit 2 
Announces 790313-14 meeting u/tlarfc II owners group to 
discuss LOG A ti safety relief valve pool dynamic loads. 
ANDERSON, C, J. Containment Systems Branch, 79/01/24. 



2pp. 



7902150462 DOCKET 30-374 LaSalle County Station, Unit 3 

Requests addl info re Amend 40 to FBAR re Sections IIIA, HID 
h IVB of Aon C t> Sections IIu I- IIC1 of App H op 10QFR30. 
Guidance encl. 
PARR.O. D. Light Hater Reactors Branch 3. 79/01/29. 5pp. 



79020B0146 DOCKET 5O-374 LaSalle County Station, Unit 3 
Forwards IE Insp Repts 3O-373/7B-34 b 30-374/7S-13 on 
7B1011-13. No noncompliance noted. 

HE1BHMAN, R. F. Region G, Chicago. Reactor Construction & 

Engineering Support Branch. 7B/12/01. 3pp. 

79020B0149 DOCKET 50-374 LaSalle Countu Station, Unit 2 

IE Insp Repts 50-373/78-24 & 50-374/7B-1B an 7B1011-I3. No 

noncomp 1 iance noted. Ma j or areas inspected: containment 

pros treising. react or internals, safety-related components 

electrical cables & electrical procedures. 

PHILLIPS.H. S. , MAXWELL, Q. F. , HAyES, 0. W. Region 3, Chicago, 

Office of the Director. 7B/11/29. 9pp. 



DOCKETED ITEMS 



105 



7902370164 DDCKET 3O-374 LnSalle County Station, Unit a 
Forwards IE Insp Repts SO-373/78-23 & 50-374/7B-16 on 
7B110i-09 ti notice of violation. 

HEI8HMAN.fi. F. Region 3. Chicago. Reactor Cnnstruction t, 
Engineering Support Branch. 7H/13/22. 2pp. 

7902270169 DOCKET 3O-374 LaSalle County Station, Unit 3 
Notice of violation from insp on 781106-09. 

HE1BHMAN, R. F. Region 3. Chicago. Reactor Construction tt 
Engineering Support Branch. 7B/12/32. 3pp. 

7902270179 DOCKET 30-374 LaSalle County Station. Unit 3 
IE Imp Repts 30-373/78-35 4. 3O-374/7S-li on 731106-O9. 
Noncompl iance noted; Inadequate specs for procuring 
mechanical anubbers, inadequate initallation & QC Insp 
procedure for hangers b snubbers, 

YIN, 1. T. Region 3. Chicago. Reactor Construction i Eng ineer ing 
Support Branch. 78/12/13. 9pp. 

7902010292 DOCKET 50-374 LaSalle County Station, Unit 3 
Forward* IE Insp Repts 30-373/78-27 b 90-374/78-19 on 
7BltOB-Q9. No noncompliance noted, 

DAVIS. A. B. Region 3. Chicago, Fuel Facility tt Materials Safety 
Branch. 78/12/23. Hpp. 



7902300003 DDCKET 30-3B2 Waterford Qenerating Station, Unit 3 
Forwards physical security plan. Details being uitftheld 
(ref 10CFR2. 790). 
ASWELL.D. L. Louisiana Poiuer t, Light Co. 79/O2/16. lp. 

7902050295 DDCKET 50-383 Waterford Qaner-atlng Station. Unit 3 
Petition to intervene filed for Save Our Wetlands, I nc . tc 
Oyster Shell Al 1 iance. Inc , Requests that applicant's 
operating license be disapproved or subj to addl safe-guards. 
H/encl affidavits & Certificate of 5vc. 
FONTANA.L. Affiliation Unknown. 79/01/29. 1 4pp. 

7902130043 DOCKET 50-383 Uaterford Generating Station, Unit 3 
Forwards IE Info Notice 79-01, "Bergen-Paterson Hydraulic 
Shock !< Sway Arresters <HSSA1." 

SEYFRIT.K V. Region 4, Dallas. Office of t-ha Director. 79/O2/02. 
IP- 

79O2Q6004B DDCKET 30-3B2 Waterford Generating Station. Unit 3 
Util 7B1203 Ur transmitting Interim ropt for significant 
const deficiency was incorrectly identified as Deficiency No 
9, Correct identification should be No 10, "Defective 
Emergency Dieiel Generator Roller Pin." 
ASHELL.D.L. Louisiana Pouier & Light Co. 70/13/19. lp. 



7902010294 DOCKET 90-374 LaSalle County Station, Unit 2 

IE Insp Repts 50-373/78-27 t. 50-374/78-19 on 7B110B-09. Mo 
noncompllance noted. Major areas inspected: radiation 
protiEtian & radwaste mg t programs, organ! lationr rad iation 
protection procedures & respiratory program, 

MILLER.D.E.. FISHER, W. L. Region 3, Chicago, Fuel Facility & 
Materials Safety Branch. 78/12/19. 3pp. 

7902090387 DOCKET 5O-374 LaBallo County Station, Unit 2 
Forwards IE Insp Repts 50-373/78-29 fr 50-371/7B-21 on 
781108-9 t. notice of violation. 

HEIBHMAN.R. F, Region 3. Chicago. Reactor Construction !. 
Engineering Support Branch, 7B/12/26. 2pp.. 



79O20S02B? DOCKET 5O-3B2 Waterford Generating Station, Unit 3 
Cooper-Bessemer has advised util that delay in replacing 
shafts Si springs which drive governors is beneficial until 
Inlet & exhaust valve cros'shoad assemblies are replaced, per 
Deficiency Repl 1O. 
ABHELL.D.L. Louisiana Power b Light Co. 70/12/29. 2pp. 

7902220132 DDCKET 5O-3B7 Susquehanna Steam Electric Station, Unit 1 
Petitions PA delegation to closely monitor dealings of NRC 
prior to t during hearings. Recommends hearings be held in 
Wllkes-Barre In federal courthouse tt that inte-rvenors be 
allotted to present separate testimonies. 
LEMANOUICZj I. Af f i 1 iotion Unknown, 7B/12/04. 3pp. 



79020903SB DDCKET SO -37 4 LaSallo County Station, Unit B 
Notice of violation from insp on 78110B-O9, 

* Region 3, Chicago, Reactor Construction !< Engineering Support 
Branch. 7B/12/18. lp. 

79020903B9 DDCKET 3O-374 LaSalle County Station, Unit 2 
IE Insp Repts 50-373/7B-29 d 50-374/78-51 On 781108-9. 
Noncompliance noted: reactor uatBr level instrumentation pipe 
Mis connected to wrong instruments. 

BAHRETT, P, A, j SPES8ARD, R. L. Region 3, Chicago, Reactor 
Construction & Engineering Support Branch, 78/1S/1B, 3pp. 

7903200471 DOCKET 50-374 LaSalle County Station, Unit 2 
Ack receipt of 790123 Itr informing NFiC to steps balen to 
correct violations noted In IE innp rapt. 

HEISHMAN, R. F. Region 3, Chicago, Reactor Construction t 
Engineering Support Branch, 79/03/01. lp. 

7902120094 DOCKET 30-374 LaBalle County Station, Unit 2 
Forwards IE Info Notice 79-01, "Bergen-Poterson Hydraulic 
Shuck t Bujay Arresters (HSSA)". 

KEPPLER, J. Q. Region 3, Chicago, Office of the Director, 79/02/08. 
4pp. 



7902220129 DOCKET 5Q-3B7 Busquehanna Steam Electric Station, Unit 1 
Requests consideration of constituent Itr. Would appreciate 
findings b viemi in dupl I catei requests return of memo & 
enc 1. 
SCHWEIKER.R. 8. Senate. 79/O1/03. lp. 

7902010044 DOCKET 30-3B7 Susquohanna Steam Electric Station. Unit 1 
Makes 10 documents requested by counsel for Gulf Oil Co 
available to the public, 
CHDPKO, ft. E, Office of the General Counsel. 79/01/lfi. 2pp. 

7902010050 DOCKET 50-387 Susquehanna Steam Electric Station, Unit I 
Aek receipt of application to const & operate units, assigns 
docket numbers, forwards Federal Register notice, tt lists 
journals where notice must be published, 
HOUR IS, P. A. Commission. 71/04/30. 2pp. 

7902010086 DDCKET 90-387 Susquehanna Steam Electric Station, Unit 1 
Notice of receipt of application for const permits tt 
licenses. Ack time for submission of vieus o-n antitrust 
matters. 
MDHRIS, . P. A. Commission. 71/04/30. lp. 



7902210220 DDCKET 90-374 LaSalle County Station, Unit 2 

Forwards IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment. " U/llst of 11 systematic evaluation program 
plant* far which no action Is required. 

KEPPLEH.J.O. Region 3, Chicago, Office of the Director. 79/02/09. 
lp. 

7902270332 DDCKET 50-374 LaBalle County Station, Unit 2 
Forwards IE Info Notice 79-03, "Limi torque Valve Geared 
Limit Switch Lubricant, " 

KEPPLEFi.J.O. Region 3, Chicago, Office of the Director. 79/03/09. 
lp. 

7903060267 DOCKET 50-374 LaBalle County Station, Unit 3 
Final rept.per 10CFRSO. 33(e), f or possible safety/relief 
valve control deficiency, upplemBnting 771111 Itp. Results of 
plant unique analysis presented in Design Assessment Closure 
R*pt. Hod of closing setpoint* to be Implemented In future. 
DELOEDROE, L. 0. Commonwealth Edison Co. 79/01/30. 3pp. 

7902090299 DOCKET 30-3B2 Waterford Generating Station, Unit 3 
Notice of 790213 meeting ui/LA Power & Light Co to discuss 
operating license safety review schedule. 
BENEDICT, R. A. Light Hater Reactors Branch 2. 79/01/26. 2pp. 



7902010091 DDCKET 50-387 Busquehonna Steam Electric Station, Unit 1 
Notifies state that util has filed application to const 
fc operate plant per 10CFR90. 43(al. 
MORRIBjP.A. Commission. 71/04/30. ip. 

7903010107 DOCKET 50-337 Susquohanna Steam Electric Station, Unit I 
Notification that util has filed application to const 
I* operate plant per 10CFR50, 43(a). 
MORRIS, P, A, Commission. 71/04/30, lp. 

7902010113 DOCKET 50-3B7 Busquehanna Steam Electric Station, Unit 1 
Notice that util has filed application to const & operate 
plant per Atomic Eneroy Act of 1954. Section 10BCO). 
PRICE, H. L. Commission. 71/09/06. lp. 



790S010119 DDCKET 50-3S7 Busquehanna Steam Electrit Station, Unit 1 
Request for addl info for financial qualifications review. 
uOVD.R.B. Office of Nuclear Reactor Regulation, 72/03/07. 2pp. 

7902010124 DOCKET 50-387 gusquehanna Steam Electric Station, Unit 1 
Notifies Commission of issuance of plant const permits. 
O'LEARY, J. F. Commission. 73/11/06. lp. 



106 



DOCKETED ITEMS 



79O2Q10132 DOCKET 50-387 SusquBhanna Bin am Electric Station. Unit 1 
Discusses circumstances surrounding lengthy revietu of plant 
6ER. 
MUNTZINQ, L M. Commission. 73/11/23. 2pp. 



7903130137 DOCKET 30-3B7 Susquehanna Steam Electric Station. U 
Forwards affidavit of svc for Amend 3 of application far 
operating 1 Icense. 
CURTIB,N.U. Pennsylvania Pouor b Light Co, 79/02/07. 2pp, 



7902010140 DOCKET 50-397 Susquehanna Steam Electric Station, Uni 
Forward! IE Iiiap Repti BO-3B7/73-02 fc 50-38B/73-02 on 
731119. No none amp Hance noted. 

CARLSOM. R, T. Region 1, Philadelphia. Reactor Construction 

Engineering Support Branch. 73/1 1/2B. 2pp, 



7902U2Q127 DOCKET 30-3B7 Susquehanna Steam Electric Station, Unit 1 
Responds to 78120-) Itr requesting copy of complete file on 
fac 1 1 ity. Forwards updated accession list to ami it selection 
of specific documents. M/o end. 
FELTON.J.M. Division of Rules and Records. 79/02/16. 2pp. 



7902010147 DOCKET 50-397 Susquehanna Steam Electric Station, Unit 1 
IE Imp Repts 50-3B7/73-02 b 50-369/73-02 on 731119. No 
nc-ncompliance noted. Major area* inspected: const schedules, 
pra-ope rational tilting b fuel loading, 

BTHEETEH, J. F. , KEISKMAN, R. F. Region 1, Philadelphia, Office of 

th Difeetnr. 73/11/27. 2pp, 

7902010I&1 DOCKET 30-3B7 Suiquehanna Steam Electric Station, Unit 1 
irtcfc receipt of 760715 Itr re correctlv* t preventive actions 
In ruponao to NRC 760610 Itr. 

CARLBOM, H. T. Region 1, Philadelphia, Reactor Construction & 

Engineering Support Branch. 76/07/21. lp, 



7903210213 DOCKET 50-387 Sutquahanna Steam Electric Station, Unit 1 
ForuardB Amend 6 to operating license application containing 
Revl*ion D to security plan. End withhold (ref 10CFRH. 790>. 
CURTIS, N.W. Pennsylvania Pouer b Light Co. 79/02/S1. lp. 

7902O602OH DOCKET 30-3B7 Sutquehanna Steam Electric Station, Unit 1 
NRC motion for extension of time to file answers to amended 
petition* to Intarvene dtd 7S1S28-29 ti 790103, Requests leave 
to file single answer to supplemented potitions bg 790126 
deadline. Certificate of Svc end. 

CUTCH1N. J. M. Office of the Executive Legal Director. 79/01/11. 
4pp. 



7902010161 DOCKET 90-3Q7 Busquehanna Bteam Electric Station, Unit 1 
Responds to NHC 760610 Itr rt violation! noted in IE Insp 
fiept 9Q3B7/76-04. Corrective action*: new procedures have 
iff en Instituted b action continual on Item "A". 
SABDLiA, R, Pennsylvania PdidBT EC Light Co, 76/07/13. 2pp. 

7903010167 DOCKET 90-3B7 Suiquehanna Steam Electric Station, Unit 1 
Flndl utll dicloiures both accurate b adequate for matters 
vubjoct to NRC jurisdiction. 
BROWNE, R. C, Hearings Division, 78/03/17. lp. 

7902D70022 DOCKET SO-3B7 Suiquehanna Steam Electric Station, Unit 1 
Requests addl Info to complete revleui of >ppllctlon for 
operating 1 Icenie. Requested tnfo covers Instrument tt control 
ty, reactor sys S nulls engineering. 
PARR.O.D. Light Mater Reactors Branch 3. 79/01/24. 2Bpp. 

7902DBOZ90 DOCKET 50-387 Suqu*hanna Steam Electric Station, Unit 1 
Notification of 790213-14 meeting u/Marl II ouner* group to 
dlmcut* LDCA & tafetij relief valve pool dynamic loads. 
ANDEfiBQN, C. J, Containment BIJ sterna Branch. 79/01/24. 2pp. 

790S26O064 DOCKET SO-3S7 fiusquehanna Steam Electric Station, Unit 1 
Forwards summary of 781203 visit to discuss site 
niBtforologg i foundation engineering, accident analysis & 
emergency plans. Individual tour repts b list of attendees 
end. 
MINER, B. Light Water Reactors Branch 3. 79/01/26. 3pp. 



7902090272 DOCKET 30-387 Susquehanna Steam Electric Station, Unit 1 
Suppl to 780903 petition to intervene. Includes notice of 
appearance, clarification at petitioner's interest t standing 
t statement op contentions. Renews request for financial help 
from NRC. W/Certif icate of Svc. 

JOHNBDUD, J. H. Environmental Coalition on Nuclear Poutr. 79/01/13. 
12 PP . 

7903010200 DOCKET 90-3B7 Sutquehanna Steam Electric Station, Unit 1 
Request permission to make limit ad appearance statement at 
hearing. 
DORKOiC.D. Affiliation Unknown. 79/01/19. lp. 

79020 J 0204 DOCKET 90-3Q7 Susquehanna Steam Electric Station, Unit I 
Requests permUslon to make limited appearance statement on 
7901S9 or 790130. 
DDNAOHV, J. A. Affiliation Unknown. 79/01 /BS. lp. 

7902010207 DOCKET 30-307 Susquehanna Steam Electric Station. Unit 1 
Requests permission to make limited appearance staten*nt at 
licensing hearing. 
ALLEN, d. L. Affiliation Unknoun. 79/01 /2Z. lp. 

7902010Z6S DOCKET 30-387 Susquelianna Bteam Electric Station, Unit t 
Requests permission jo make a limited appaaranc* statement 
at hearing. 
BOYLAN, J. Affiliation Unknown. 79/01/19. lp. 



7903260094 DOCKET 50-3B7 Buiquehanna Bteam Electric Station, Unit 1 
Summary of 7Q1209 site visit. Describes local hospital uihich 
would b used to treat any injured plant uorkersjalsa 
describes area adjacent to lite. 

FEdftELL.C. , VAN NEIL.R. Accident Analysis Branch, 79/01/24. 

2pp. 



7902120077 DOCKET SO-3S7 Busquahanna Steam Electric Station, Unit 1 
NRC ansuar to amended petition to intervene of Colleen 
Harsh, *t al. Recommends granting petition because at leatt 
one admissible contention is set forth u/reasonatala 
specificity. 

CUTCHIN, J. M. Office of the Eiecutive Legal Director, 79/01/36. 
10pp. 



7902060349 DOCKET 30-3B7 Susquehanna Steam Electric Station, Unit 1 
Responds to request by S Miner to compare facility 
containment design loads due to LOCA u/ loads used by three 
Hark II plants. 
CURTIS, N.H. Pennsylvania Pouer t. Light Co. 79/02/02. 3pp. 

79020903 43 DOCKET 90-397 Qusquahanna Bteflm Electric Btation, Unit 1 
Forwards OE topical rapt NEDQ-24010-2, Buppl 2, "Base* for 
Ci-ItsTia for Combination of Earthquake & Other Transient 
Responses by the Square-Raot'Sum-Df-The-Bquares Method. " 
Rapt Is provided on behalf of Hart Z Owner's Croup. 
SQBON,L.J. General Electric Co.iNuclear Energy Products Dlv. 
79/02/03. lp. 

7903090367 DOCKET SO-3Q7 SuiquehannA Steam Electric Station, Unit 1 
Suppl 2 "Dasii for Criteria for Combination of Earthquake *. 
Othr Transient Responses By the Square-Roc t-Sum-of-the- 
Squares Nethod. " Discussei method for combining multiple 
peal dynamic responses for blast* l< *irthquakss. 
KENNEDY, R. P. Oentral Electric Co., Nuclear Energy Products Dlv, 
NEDO-B4Q10-a. 78/12/31. 30pp. 

7902330217 DOCKET BO-3S7 Buiiuvhanna Bteam Electric Station, Unit 1 
Re quests fldcfl infb re mechanical engineering, ttructural 
enginaerlng b conduct of operations, to continue review of 
application. 
PARRiO. D. Light Maker Reactors Branch 3. 79/02/OB. 91pp. 



79021200B1 DOCKET 30-387 Susquehanna 8tm Electric Station. Unit 1 
NRC answer to amended petition to Intervene of Cltiens 
Against Nuclear Dangers. Recommends denying petition because 
of lack of admissible contention b expiration of time to 
amend or supplement petition. 

CUTCH1N, J. M. Office of the Eiecutlve Legal Director. 77/01/36. 
16pp, 

7902120084 DOCKET 30-387 8u*quehanna Steam Electric Station, Unit 1 
NRC anauier to amended petition to Intervene of Susquehanna 
Environ Advocates. Recommend* granting petition because it 
presents admissible contention w/reaionaele tpaclf icitij, 
CUTCHIN, J. H. Office of thft Executive Legal Director. 79/01 /Si. 
12pp. 

79021 300B6 DOCKET 90-3S7 Susquihanna . Steam Electric Station, Unit 1 
NRC anauer to amended petition to Intervene of Environ 
Coalition on Nuclear Pouer. Racomnends granting petition I 
ordering hearing since admissible contention ha* been 
presented. Certificate of Bve end. 

CUTCHIN, J. N. Office of the Executive Legal Director. 79/01/84. 
13pp. 



790B130039 DOCKET 50-387 Susquiihanna Steam Electric Station, 

ition tc 



rUnlt 1 
, 

Intervene of 8utqueha,nna Environ Advocate*. Concludes that 
latter should be admitted as intervenor u/certaln 
contentions. Certificate of Svc end. 

SILBERO, j.e. , YUBPEH.A.R. Shaw, Pittmin. Potts, b Trowbrldge.. 
79/01/26. ' 19pp. 



DOCKETED ITEMS 



107 



7908140220 DOCKET 90-3B7 Susquahanna Steam Electric Station. Unit 1 
Applicants' response to contentions in suppl petition to 
Intervene of Citizens Against Nuclear Danges, Concludes that 
latter sfiould bo admitted as. intervenor u/csrtaln 
contentions. Certificate of Bvc encl. 

BILBERO, J. E. , VUBPEH, A. R. Shaw, Plttman, Potta. ti Trowbridge. 
79/01/26. 2Bpp. 

7908140227 DOCKET 30-3B7 Busquehanna Bteam Electric Station, Unit 1 
Applicants' response to contentions In amended petition to 
Intervene of Environ Coalition on Nuclear Power. Concludes 
that latter should be admitted as intervenor u/certain 
contentions. Certificate at Bvc end. 

BILBERO. J. E. . VUSPEH, A. R. Shaw, Pittman, Potts, d Troubr idge. 
79/01/26. 21pp. 

7902140229 DOCKET 30-3B7 Suaquehanna Btoam Electric Btation, Unit 1 
Applicants' response to contentions in suppl petition to 
intervene of Marsh, et al. Concludes that latter should be 
admitted as Intervenor ui/ccrtain contentions. Certificate of 
Bvc encl. 
BILBERO, J. E. , YU8PEH. A. R. Bhau, Pittman, Potts, ft Trowbrldge. 

79/01/26. 13pp. 

7908140122 DOCKET 30-387 Busquehanna Steam Electric Station, Unit 1 
Forwards correspondence re facility t. requests copies of any 
NRC findings t views in regard to this matter. 
8CHHEIKER, R. 8. Senate. 79/01/09. lp. 

7902140130 DOCKET 30-387 Susquohannfl Steam Electric Station, Unit 1 
Responds to NRC 7B1103 Itr. Sees no merit in meeting 
w/attornys for NRC b PA Power & Light. Cltiiens Against 
Nucliar Danoesr are prepared to go directly to public 

LEMANOWICZ, I Citiiens Against Nuclear Dangers. 70/12/04. 3pp. 

7902200072 DOCKET 30-387 Susquehanna StBam Electric Station. Unit 1 
Forwards oddl info in response' to 7B1211 Itr requesting 
financial info oF certain electric facilities from 
Metropolitan Edison Co, ,, 

CURTIS,N.H. Pennsylvania Power 8. Light Co. 79/02/09. BSpp. 

7902060394 DOCKET 50-3B7 Busquehanna Steam Electric Station, Unit 1 
Forwards IE Insp Repts 30-387/78-21 fc 50-338/7B-19 on 
781809-08. No noncompliance noted. ,.,.,. 

CARLSON.R.T. Region 1. Philadelphia, Reactor Conntruction fc 

Engineering Support Branch. 7B/12/B6. 2pp. 

7902060397 DOCKET SO-3B7 Busquehanna Steam Electric Btation, Unit 1 
IE Insp Repts 30-3B7/7B-21 t. 30-3BB/7B-19 on 781203-08. No 
noncompliancB noted. Major areas inspected: piping storage, 
maint, & installation activities t< documentation. 
DURR.d.P,. EBNETER.8.0. Region 1. Ph lladelphia, Reactor 

Construction l< Engineering Support Branch. 78/12/32. 3pp. 

7702230199 DOCKET 30-3B7 Eusquahanna flteam Electric Btation, Unit 1 
Forwards IE Insp Rept 3O-387/7B-22 on 781212-14. No 
noneompliancB noted. 

CAHLBON.R.T. RBgion 1. Philadelphia, Reactor Construction & 

Engineering Support Branch. 79/01/OB. 2pp. 

7902230202 DOCKET 30-307 Busquehanna Bteam Electric Station. Unit 1 
IE Insp Rfpt 30-3B7/7B-22 on 781212-14. No noncomplianee 
noted. Major areas inspected: component storage, installation 
oF Jncore housings in reactor pressure vessel, welding oF 
safety-related piping fc preservice insp activities. 
MAUTDN.O. , JERNIOAN.E. Region 1. Ph 1 ladelph la, Rtor 

Construction & Englneorlng Support Branch. EBNETER.8.D. Region 

1, PhlladBlphia, Office of the Director. 79/01/OB. 3pp. 

7902010241 DOCKET 80-387 Susnuehanna Steam Electric Station, Unit t 
Forwards IE Circular 79-02, "Failure of 120 Volt Vital AC 
Power Supplies." _, . 

ORIER.B.H. Region 1, Philadelphia, Office of the Director. 

79/01/16. 8pp. 

790H130018 DOCKET SO-3B7 Susquohanna Steam Electric Station. Unit 1 
Forwards IE Info Notice 79-01. "Beroen-Paterson Hydraulic 
Shock t> Busy Arresters (HSSA)." 

ORIER.B.H. Region 1. Ph i ladolph la, Office of the Director. 
79/02/02. 2pp. 

79022B0497 DOCKET 90-387 Busquehanna Steam Electric Station. Unit 1 
Forwards IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipmsnt. " W/list of 11 systematic evaluation program 
plants for uihlch no action Is required. 

ORIERiB.H. Region 1, Philadelphia, Office of the Director. 
79/08/08. IP. 



79OS0601BO DOCKET 50-3B7 Su[iuahannfl Steam Electric Station, Unit 1 
Confirms 79O201 phone conversation granting ftO-dny *teniinn 
for submlttal of final definitive rept re ueids on lafeti,- 
related pips hangars. ,, 

CURTIB.N.W. Pennsylvania Power t. Light Co. 79/02/02. 3pp- 

7902070109 DOCKET 30-387 Susquehanna Bteam Electric Station, Unit 1 
Transcript of 790129 special prehearlng conference In 
WllkBS-Barre. PA re validity of contentions. Py 1-73. 

UECHHDEFER.C., BfilOHT. 0. O. , PAR1S.O.H. Atomic Safety and Licensing 
Board Panel. 79/01/29. 73pp. 

790209001B DOCKET 50-3B7 Susquohanna Steam Electric Btation, Unit 1 
Transcript of 790130 tiaaring in Wi U BS-DarrB. PA re limited 
appearances in proceeding- Pp 74-246. 

DECHHOEFER, C, , DRIOHT.O.O., PARIS, 0. H. Atomic Safety and Licensing 
Board PanBl. 79/01/30. 192pp. 

7903090003 DOCKET 50-3B7 Suiquahanna Steam EUctric Station. Unit 1 
Transcript of 790131 herlng In Wllkes-Darre- PA re Civil 
Difanse radioactive emission J. ECCB. Pp 267-374. 

DECHHOEFER. C. , BRIGHT, 0.0. , PARIS, 0. H. Atomic Safety and Llcenslnu 
Board Panel. 79/01/31. 107pp. 

79020100B6 DOCKET 50-3B8 Susquehanna Steam Electric Station. Unit 3 
Notice of receipt of application for const permiti tc 
licenses. Ack time For submiesion of vieus on antitrust 
matters. 
MORRIS, .P. A. Commission. 71/04/30. lp. 

7902010113 DOCKET 50-3BB ausquahanna Steam Electric Station, Unit 2 
Notice that util ho* filed application to const (< oparate 
plant per Atomic Energy Act of 1934. Section I05CI3). 
PRICE, H. L. Commission. 71/03/06. lp. 

7902010119 DOCKET 50-388 Busquehanna Steam Electric Station. Unit 2 
Request for addl info for financial qualifications review. 
BOYDiR.B, Office of Nuclear Reactor Regulation. 73/03/07. Bpp. 

7902010124 DOCKET 50-3BB Suiquehanna StBam Electric Station, Unit 2 
Notifies Commission of Issuance of plant const pormita. 
O'LEARViJ.F. Commission. 73/11/06. lp. 

790201013B DOCKET 50-3BB Buiquehanna Steam Electric Station, Unit 2 
Discusses circumstances surrounding lengthg review of plant 
SGR. 
MUNTZINQ.L. M. Commission. 73/11/23. 2pp. 

7902010H7 DOCKET SO-38B Smquehanna Steam Electric Station, Unit B 
IE Insp Reptfl 50-3S7/73-02 30-368/73-02 on 731119. Mo 
noncompllance noted. Major areas Inspected: const schedule*, 
pre-operational lasting t fuel loading. 

8TREETER, J. F. . HEIBHMAN, R. F. Rsgion 1, Pftllade Iph ia. OfflcB of 

the Director. 73/11/27. 2pp. 

7902320132 DOCKET 30-388 Busquehanna Steam Electric Station, Unit 2 
Petitions PA delegation to closely monitor dealings of NUC 
prior to & during hearings. Recommends hearings be held in 
Hillies-Barre in federal courthouse d that intervenors be 
allouod to present separate testimonies, 
LEMANOMICZ, I. Affiliation Unfcnouin. 78/12/04. 3pp. 

7702280129 DOCKET 30-389 Busquehanna Steam Electric Station, Unit S 
Requests consideration of constituent Itr. Would appreciate 
findings & vleuis in dup licatei requHsts return of nemo * 
end. 
SCHHEIKER.R.S. Senate. 79/01/03. lp. 

79020100SO DOCKET SO-38B Busquehanna Steam Electric Station, Unit 8 
Act receipt of application to const b operate units, assigns 
docket numbers, forwards Federal Register notice, & lista 
journals uhere notice must be published, 
MORRIS. P. A. Commission. 71/04/30, 2pp. 

7902010091 DOCKET BO-3B8 Busquehanna Steam Electric Station, Unit 2 
Notifies state that utll haa filed application to const 
& operate plant plr 10CFR30. 43(a . 
MORRIS, P. A. Commission. 71/04/30. lp. 

7902010140 DOCKET SO-38B Susquehanna Steam Eloctric Station, Unit 2 
Forwards IE Insp ReptE 50-3B7/73-02 t< 5Q-3BB/73-02 on 
731119. No noncompliance noted, 

CARLSON.R.T. Region 1, Philadelphia, Reactor Cons.truc tion & 

Engineering Support Drancli. 73/11/28, 2pp. 

7902070022 DOCKET 30-3SB Susquchanna Steam Eloctrlc Station., Unit 8 
RequBsts addl Info to complete review of application far 
operating license. RBquested info covers instrument !< control 
sya, reactor sys t< mails engineering. 
PARR-0. D. Light Hater Reactors Branch 3, 79/O1/24. 28pp. 



108 



DOCKETED ITEMS 



79Q20B0290 DOCKET 50-368 Susquehanna 5taam Electric Station. 
Notification of 790313-14 meeting a/Mart It dinners group t 
discusi LDCA J, safety relief valve pool dynamic loads. 
ANDERSON, C. J. Containment Systems Branch 79/01/31. 



7902010204 DOCKET 3O-3BB SusquUanna Steam Electric Station, Unit 3 
Requests permission to make limited appearance statement on 
790139 or 790130. 
DDNAQHY, J. A. Affiliation Unknown. 79/O1/22. Ip. 



7903360064 DOCKET 50-335 Susquehanna Steam Electric Station, Unit 2 
Forwards summary of 7Q1205 visit to discuss site 
meteorology, foundation engineering. accident analysis I, 
emergency plans. Individual tour repts t. list of attendees 
nc 1. 
MINER, S. Light Hater Reactors Branch 3. 79/O1/26. 3pp. 

7902260054 DOCKET 50-3BB Susquehanna Steam Electric Station. Unit 3 
Sjmmaru df 7S1203 site vi si t. Describes local hospital which 
mould be used to treat any injured plant worker si al so 
describes area adjacent to site. 

FERHELI-.C., VAN NEIL, 0. Accident Analysis Branch 79/01/24 

3pp. 



7902010207 DOCKET 30-3S8 9usquehanna Steam Electric Station, Unit S 
Requests permission to make limited appearance statement at 
licensing hearing. , 

ALLEN, J, L. Affiliation Unknnuin. 79/01/35. Ip. 

7902120077 DOCKET 90-3BB Susquehanna Steam Electric Station. Unit 3 
NHC answer to amended petition' to intervene of Colleen 
Marsh, et al. Recommends granting petition because at least 
one admissible contention in set forth u/reasonab le 
apecif ici ty. , 

CUTCHIN, J. H. Office of the Eiecutivo Legal Director. 79/O1/EA. 
10pp. 



7903060249 DOCKET 30-395 Susquehanna Steam Electric Station, Unit 2 
Responds to request by S Miner to compare facility 
containment design loads due tn LOCA w/loads used by three 
Mark II plants. 
CURTIS, N.W. Pennsylvania Pou 



Light Co. 79/03/02. 5pp. 



7-702090343 DOCKET 30-3BS Susquehanna Steam Electric Station, Unit 2 
.Forwards QE topical rept NEDD-24010-2, Supp 1 2, "Bases for 
Criteria for Combination a! Earthquafce (. Other Transient 
Responses by the Square-Root-Bum-Of-The-Squares Method, " 
fiept is provided on behalf of Mark 2 Owner's Group. 
EDBDN.L.J. General Electric Co., Nuclear Energy Products Div 
79/03/05. Ip. 



79021200B1 DOCKET 50-3BB Susquehanna Steam Electric Station, Unit 2 
NRC answer to amended petition to intervene of Citisns 
Against Nuclear Dangers, Ileco/nmends denying petition because 
of lack of admissible contention t< enpiration of time to 
amend or supplement petition- 

CUTCHIN. J, M. Office of the |Eecutive Legal Director. 79/01/2A. 
16pp. 

79021200S4 DOCKET SO-3BB Busquehanna Steam Electric Station- Unit 3 
NRC answer to amended petition to intervene of Busquehanne 
Environ Advocates. Recommends granting petition because it 
presents admissible contention in/reasonable spec 1 fie 1 ty . 
CUTCHIN, J. M. Office of the 'Executive Legal Director. 79/OI/HA. 
12pp. 



7902090367 DOCKET 50-3BB Susquehanna Steam Electric Station, Unit 2 
Suppl 2 "Basis for Criteria for Combination of Earthquake li 
Other Transient Responses By the SquHre-Root-Bum-of-the- 
Squares Method." Discusses method for combining multiple 
peak dynamic responses for blasts !< earthquakes. 

KENNEDY.R. P. General Electric Co. .Nuclear Energy Products Div 
NEDO-31010-2. 78/12/31. 30pp. 

7903330317 DOCKET 30-3BB Susquehanna Steam Electric Station, Unit 2 
Requests addl infn re mechanical engineering, structural 
engineering !< conduct of operations, to continue review of 
appl icaticn. 
PARR.O. D. Light Hater Reactors Branch 3 79/02/OB. 51pp. 

7702130137 DOCKET 50-3SB Susquehanna Bteam Electric Station. Unit 2 
Forwards affidavit of svc For Amend 5 of application for 
operating 1 icense. 
CURTIS. N, W. Pennsylvania Pnwer t Light Cn. 79/02/09. 2pp. 

7902220127 DOCKET 50-3BB Suaquehanna Steam Electric Station, Unit 2 
Responds to 7B12O4 Hr requesting copy of complete file on 
facility. Forwards updated accession list to assist selection 
of specific documents. W/o encl. 
FELTDN.J.M. Division of Rules and Records. 79/O2/16. 2pp. 

7703210215 DOCKET 50-3BB Susquehanna Steam Electric Station, Unit 2 
Forwards Amend 6 to operating license application containing 
R*vislon E to security plan. Encl withheld (rof 10CFR2 790) 
CUHTIS.N. W. Pennsylvania Power i, Light Co. 79/02/21. Ip] 

790S010265 DOCKET 50-399 Busquehanna Steam Electric Station, Unit a 
Requests permission to make a limited appearance statement 
at hearing. 
BOVLAN.J Affiliation Unknown. 79/01/19. Ip. 

79Q206020S DOCKET SO-3BB Susquehanna Steam Electric Station, Unit 3 
NRC motion for e. tension of time to file answers to amended 
petitions to intervene dtd 7QIS3S-29 i, 7901O3, Requests leave 
to file single answer to supplemented petitions by 790126 
deadline. Certificate of Svc end. 

CUTCHIN. J. H. Office oF the Executive Legal Director 79/01/11 
4pp. 

7902050272 DOCKET SO-3BB Busquehanna Stearc Electric Station. Unit 2 
Suppl to 7B0903 petition to intervene. Includes notice nf 
appearance.clapification of petitioner's interest I, standing 
iL ^ril^ f l " ntBntiD "=- Renews request for Financial help 
tram NHC. H/Certif icate of Svc 

JOHNSRUD, J. H. Environmental Coalition en Nuclear Power. 79/01/15 
12pp. 

'902010200 DOCKET 5Q-3BB Susquehanna Steam Electric Station, Unit 2 
Request permission to make limited appearance statement at 
Hearing. 
DOJWQ.C.D. Af Filiation Unknown. 79/01/19. Ip. 



79021200B4 DOCKET SO-3BS Susqu,ehanna Steam Electric Station. Unit 2 
NRC answer to amended petition to intervene of Environ 
Coalition on Nuclear Poujer. Flecommends granting petition fc 
ordering hearing since admissible contention has been 
presented. Certificate of Svo encl. 



CUTCHIN, J. M. 
13pp. 



Office of the 



Eiecutive Legal Director. 79/01/S6. 



7902130039 DOCKET 50-3BB Susquehanna Steam Electric Station- Unit 8 
Applicants' response to contentions in amended petition to 
intervene of Susquehanna Envijnn Advocates, Cone ludeo that 
latter should be admitted as intervenor la/certain 
contentions. Certificate of Bve encl. 

SILDERO, J.E, , YUSPEH.A.R. Shiw, Ptttman. Potts, t, Troiubr 1 d ne. 
79/01/26. 19pp, " 

7902140220 DOCKET 5D-3BB Susquehanna Steam Electric Station, Unit a 
Applicants' response to contentions in suppl petition to 
intervenn of Citiicns Against I Nuc lear Oanges. Cone 1 udes that 
latter should be admitted as Intervenor iii/certaln 
contentions. Certificate of Svf encl 

SILBERO, J.E. , YUSPEH.A.R. Bhfew, Pittmnn, Potts, 5, Trou.brid B 9. 
79/Ot/3i. ESpp. ( 



7902140227 DOCKET 50-3BB Susquc 
Applicants' response to conte 
Intervene of Environ Coalitlo 
that latter should be admitte 
contentions. Cert if icate of Svi 
E. , YUSPEH.A.R. Shi 
21pp. 



anna Bteam Electric Station, Unit S 
itions in amended petition to 
l on Nuclear Power. Concludes 
1 as intervenor ui/cevtaln 
encl. 

a, Pittman, Potts, d Trauibrldflo. 



7902140239 DOCKET 50-388 B UaquH |,anna Steam Electric Station, Unit S 
Applicants' response to contentions in suppl petition to 
intervene of Marsh, et al . Concludes that latter should be 
admitted as intervenor uj/certain contentions. Certi ficate of 
Svc end, 

79/01/26' E l3p VUSPEH ' A lR< B "^ U ' Pittman ' PQttB ' fc Troubridfle. 



o ' 

. S, Senate. 79/01/OS. Ip, 



LEMANOWIC7. I CIti, ens Against Nuclear Dangers. 7B/12/04, 3pp. 

790320007S DOCKET SO-3BB Sosquehanna Stea-n EUctrlc Station Untfc 3 
Forwards ad info in response to 7B1211 1 r 

''" B elBctrlt 



o, Bn 

CURT1S.N.W. Pennsylvania Power t. Light Co. 79/02/09. B3pp. 



DOCKETED ITEMS 



109 



7902Oi0394 DDCKET SO-38B Susquehanna Steam Electric Station, Unit 2 
Forwards IE Insp Repts 30-3B7/7B-21 fc 30-3BB/7B-19 on 
7B1203-OB. No nancompliance noted. 

CARLSON, R. T. Region 1. Philadelphia. Reactor Construction t, 

Enginesring Support Branch. 7B/12/26. 2pp. 

7702060397 DDCKET 50-338 Susquehanna Steam Electric Station. Unit 
IE Insp Repts 30-3B7/7B-21 tt 30-3BB/7B-I9 on 7B120S-OB. No 
noncompllance noted. Major areas i nsp ec ted: p Iping storage, 
(mint, ti installation activities ti documentation. 
DUHR.J.P., EBNETER.B. D. Region 1. Philadelphia. Reactor 

Construction tt Engineering Support Branch. 78/12/23. 5pp. 

79Q2O1O241 DDCKET 50-383 Busquehanna Steam Electric Station. Unit 2 
Forwards IE Circular 79-02, "Failure of 120 volt vital AC 
Pouter Supp lies. " 

GRIERiB.H. Region 1, Philadelphia, Office of the Director. 

79/O1/16. Bpp. 

79-02130018 DOCKET SO-3BB Susq.uohanna Steam Electric Station. Unit 2 
Forward! IE Info Notice 79-O1. "Berg en-Paterson Hydraulic 
Shock Ei Bway Arresters (HSBA), " 

OHIER.B.H. Region 1- Philadelphia. Office of thw Director. 

79/02/02. 2pp. 



7902260-134 DOCKET 5O-3Q9 St. Lutio Plant, Un t t 2 

Forwards Endorsement 3D to AMI Policy NF-227. End orsement 
amen!) a 1979 advance premium to reflect a refueling uliutdau 
DUCK. J. R. Marsh !. McLennan. Inc. 79/02/19. 3pp. 



79O214023B DOCKET SO-3S9 3t. Lucle Plant, Unit 3 

Requests opportunity to File reply brief or present oral 
argomont re matters of fact in FL Cities' response to 
applicant's objections & motion. Certificate of Svc end. 
UDUKMIGHT. J A. Lonfenstii i n, Norman, Rem, Aiel rail !. Toll. 79/O1/I7. 
3pp. 

79O22300fl4 DOCKET SO-3B9 St Lucie Plant, Unit 3 

Requests equal opportunity for FL Cities to respond If FL 
Pouer & Light CD'S 79O117 request tn present further 
argument '* granted . Cert i f ieata of Svt end. 
GUTTHAN, D. Spieael t, McDiarmid. 79/OI/S3. 3jip. 

79O32iOi335 DOCKET 5O-3B9 St. Lucie Plant. Unit 2 

Bummarlies 791213 meeting in Hethe srfa, MO, ui/rcproaeTi tati VDS 
of utils u/post-CP applications to discu&s pending DL 
revieu matters, Includina staff pal ic IDB t, revleu pr i nriiy 
criteria. Discuss! on area* t, attendees list enc 1. 
L1CITRA,E, Light Water Reactors [Iraiicti 3. 79/01/13 Bpp. 



7903280497 DOCKET 50-30B GuBq.uehatina Steam Electric Station Unit 2 
Forward! IE Bulletin 79-01. "Environ Qualification of Class 
IE equipment. " H/liBt of 11 systematic evaluation program 
plants for luhich no action tt required. 

ORIER.B.H. Region 1' Philadelphia. Office of the Director. 

79/O3/OB, IP. 

7702Oi01BO DOCKET 30-3BB Suso.uehanna Steam Electric Station. Unit 3 
Confirms 79O2QI phone conversation granting 60-day extension 
far lubmittal of final definitive ropt.re uields an safety- 
rnlated pipe hangars. 
CURTIS, N.W. Pennsylvania Pouer b Light Co. 79/02/02. 2pp. 

7902070109 DOCKET 90-3BB Susq.uehanna Steam Electric Station, Unit 2 
Transcript of 790139 special prehearlng conference in 
HiHies-Darrei PA re validity of .content ions. Pp 1-73. 

DECHHBEFER, C. , BRIGHT. O.O,, PARIS, O.H. Atomic Safetg and Licenainj 
Doard Panel. 79/01/B9. 73pp. 



7TO30B02A4 DDCKET 5O-2B7 St. Lucie Plant. Unit S 

Supports proposed eitension of Price- Anderson prpviiions r 
indemnification nf spent nuclear fue-1 regardless of utioro 
fuel is stored. 
UHRIQ.Fl. E. Florida Pomor b Light Co, 79/O1/2?. Ip. 



77O22a01O, DOCKET 3O-2B? St. Lucie- Plant. Unit 2 

Forwards IE Info Notice 79-01, "Berg en-PatErEan Hijdraulic 
Shock (. Suiaij ArroEtors <HSSA). " 

O'REILLY, J. P. Region 2, Atlanta, Office of the Director. 

5pp. 



7903230324 DDCKET 30-33? St. Lucie Plant. Unit S 

Forwards IE Bulletin 79-01, "Environ Qualification oP Class 
IE Equipment. " tf/llat of 1) sgatemati c evalu.it I on program 
plants far which no action Is required. 

C'REILLV, J. P. Region S, Atlanta, Office of tho Diructor. 

79/02/OB, 2pp. 



7903O9001B DOCKET 30-3BE3 Susq.uehanna Steam Electric Station, Unit 2 
Transcript of 790130 hearing In Wl 1 kes-Barre. PA re limited 
appearanCBB in prnc aed Ing. Pp 74-S&&. 

BECHHDEFER.C. , BRIGHT, O.O., PARIS, Q, H. Atomic Safatg and Licensing 
Hoard Panel. 79/01/30. 19Epp. 



79O2300103 DDCKET 3O-33? St. Lucie F'lant. Unit S . 

Forwards IE Info Holito 79-O3, "Lini torque Valve Geared 
Limit Suited Lubricant." 

O'DEILLV, <J. P. Region 2, Atlanta, Office of the Director. 

79/03/09. 3PP 



79O2O90003 DDCKET 5O-3B8 Busquehanna Bteam Electric Station. Unit B 
Transcript of 790131 hearing in Mi 1 kes-Qarro. PA ra Civil 
Defense radioactive emiBsion d ECCS. Pp 267-374. 

BECHHQEFER. C. , BRIGHT, 0,0. , PARIB, 0,H, Atomic Safety and Liter. ing 
Board Panel. 79/01 731. 107pp. 



790223O2&3 DOCKET 30-3-70 Watts Bur Nil Clear I'lflnt, Unit; I 
Forward B items omitted from 7130713 Itr. pending further MRC 
revlDui. Items involve Instrumentationi & Control Sys Branch 
request for Info re FSAH. solid state logic testing & 
description of essential raw cooling uiator BIJB, 
VAROA.S. A. tight Water Reactpra Branch 1. 79/OE/09. 5pp. 



79O12202BO DOCKET 90-389 St. Luc 1 e Plant, Unit S 

Forwards NUREQ/CR-4OO- "Fllsk Assessment Revieu Group Rpt to 
the US NRG" to parties of proceeding, NAC developing policy 
statement re rept, 
PATDN, W. D. Office of the Executive Legal Director. 79/01/1D. 

7902220334 DOCKET 30-3B9 St. Lucie Plant, Unit S 

Motion by Intervenors to file late response to opposition by 
FL Power d Light Co to motions for neui contention tt for 
ataV'due to atty'a delay for lack of time t< money. 
HODDER.M. H. Affiliation Unknown. 79/O1/30. 2pp. 

79Q222023B DOCKET SO-339 St. Lucie Plant, Unit 3 

Intervenors* response to FL Pouer t< Light CD'S opposition 
to motions for neiu contention (< for stay. Certl f Icate of Svcr 
related docuirents !< correspondence oncl. 
HODDER.M. H. rtffi liatlon Unknown. 79/01/30. 39pp. 



7902060253 DDCKET 9O-3B7 St. Lucie Plant, Unit S 
Foruiards EndorsBmant 3 to Policies XB-23, XB-S6 
FIELDER. J. Marsh & McLennan. Inc. 79/OH/02. 



hi XD-39. 
3pp, 



7902120173 DQCHET 30-309 St. Lucie Plant, Unit 2 
Forui*rd Endorsement 29 to NELIA Policy NF-2B7. 
FIELDER, J. Marsh tt McLennan, Inc. 79/02/06. Spp. 



7902H30163 DOCKET 30-3B9 St. Lucie Plant. Unit 3 

Forward Endorcement 23 to MAELU Policy MF-BB. Amend i 

Condition 4 to reflect new pool capacity. 

DUCKiJ. R. Mar<in & McLennan. Inc. 79/OH/16. 2pp. 



79Q2Q3Q21B DOCKET 50-390 Watts Bar Nuclear Plant, Unit 1 
Ack receipt of FEIS (NUREO-O47B ) , (f evi eu IB in pronrsBS. 
ItAQGETT.C. North Caroline, Stale of. 79/02/O5. Ip. 



790B2B0309 DOCKET 50-390 WattE Dar Nuclear Plant. Unit 1 
Has no comment on FES for facility (NUHEO-047Bt. 
DAOQETT.C. Nnrth Carolina, State of. 79/02/19. Ip. 

7902230061 DDCKET 50-390 Watta Bar Nuclear Plant. Unit 1 

Informs that TFJADDC Pamphlet 390-30. " I nterservic o PrnceiJuvs 
for Instructional Bys ftevalopmont" referenced in NUF1EO-OS19 
is available in microfiche form from NflC. 
QESAM.H.J, Division of Document Control. 7H/ll/ao. 3pp. 

790209O24E DOCKET 5O-390 Watts Bar Nuclear Plant, Unit 1 

Notice of address changes for distribution nP corroip dndonto 

to utll re plant ay pi i cat! on. 

OILLELAND. J, E. Tennessee Valley Autliority, 79/O2/05. HDP 

79O20E0217 DDCKET 3O-39O Watts Bar NucJoar Plant, Unit I 

Foruiardfi copies of pages Ids to FBAR Amend 37. Corroc ts amend 

number on page 1, originally submitted on 790121. 

OILUELAND, J. E. Tennessee Valley Authority. 79/O1/3O. 3pp. 

7902200040 DOCKET 30-390 Watts Bar Nuclear Plant, Unit I 
Forwards affidavit certifying that on 790208, Around 37 to 
FSAIt USE served upon idcntlfiod individuals, 
MILLS, L. M. TennHESBB Valley Authority. 79/O2/OB. 2pp. 



110 



DOCKETED ITEMS 



7902210136 DOCKET 30-390 Hatti Oar Nuclear Plant. Unit 1 
Forwrifi IE Imp Rpts 3Q-390/7B-31 t. 50-391/7B-26 on 
791123-1201 (, notice of violation 

MURPHY.C. 6 Region 3. Atlanta, Reactor Construction !, Engineerlnfl 
Support Branch 7B/I2/22 2pp. 

7902310139 DOCKET 50-390 Watts Bar Nuclear Plant. Unit I 
Notice of violation fron insp on 781128-1201. 
MURPHY.C. E. Region 2. Atlanta. Reactor Construction & 
Ensinnrino Support Branch. 7B/12/22. 2pp. 

7903S10143 .DOCKET SO-3TO Hatts Bar Nuclear Plant. Unit 1 
IE Imp Repts 30-390/73-31 & 50-391/78-26 on 7B112B-I20I 
Noncompliance noted: no interpass temp checks were being 
performed on uilding storage area 

CCNLON.T.E. R.gion 3. Atlanta! Reactor Construction (, 
fcnjlneei-ing Support Branch. 7B/12/22. 9pp. 

7902220103 DOCKET 30-390 Hatts Bar Nuclear Plant, Unit I 

Forwards IE In.p Rept 50-390/78-32 on 781212-15 i notice of 

VI Ql fl tlOTK 

:lanta. Reactor Construction t Engineering 



7903220110 DOCKET 50-390 Halts Oar Nuclear Plant, Unit 1 
Notice of violation from insp on 7B1212-1H 

MURPHY.C.E. Region 2. Atlanta, Reactor Construction & 
Engineering Support Branch. 79/OI/Q?. lp. 

7902320113 DOCKET 50-390 Halts Bar Nuclear Plant. Unit 1 

IE in.p flept 30-390/78-33 on 7B12i3-15. Nonc D mpl i aneB noted: 
mvMT a tt """I*'."" " Dt acceptabl, method of mounting. 
BHYANT.J C. Refuon 3. Atlanta, Reactor CDnitruction I 
Engineering Support Branch. 79/01/09. 4pp. 

7903270137 DOCKET 30-390 Hatts Bar Nuclear Plant. Unit 1 

'*" int *"* NRC of steps taken to 
'" ' E ^" K ' t 



79022701M DOCKET 50-390 Hatts Bar Nuclear Plant, Unit I 
nwiponas to NHC 78132S Itr rn Vealatinna * j TC- * 
Rept 5Q 390/7B-31 If 5Q-39l/7fl SA r i *"*p 

OILLELAND""E V "renne^ee'van^ S"hort{ y nStr 79Jo?/i6. a 

770*?1E009D DOCKET 5Q-39Q Watt* Hai- Muci DI 

^/D^'^pr"' 30 " 11 '^ 13 " 13 ' fM " f the =" 
For!ids DOCKET 50-390 Hatts Bar Nuclear Plant, Unit 1 



lant3 ' ffl " Df *". Directo 
B " "<*'" t. Unit , 



1LLELANO,J.E. Tennessee V-ll.u Authority 79/02/2O. 



Spp. 



.nt. Unit 2 



Hater Reactor, Branch 4 79/02/09. 



Spp 



fS^'.KfS.SS? 1 ;;.;,-;.'; 5;^!;-; "- " 

for Instructional Sus Sevelor,^" I "" rvl " P 

Jksftr- 's ("'!:": '"' B "' 1 ln fjuflEo 

BEBA M ,y.J. Oiv.sion of Document Control. 7B/11/30. 



3pp. 



7902090242 DOCKET 30-391 Watts Bar Nuclear Plant, Unit 2 

Notice of address changos for distribution of correspond ancie 

to TVA re plant application. 

OILLELAND.J.E. Tennessee Valley Authority. 79/08/03. Spp,. 

7902020247 DOCKET BO-391 Watts Bar Nuclear Plant, Unit 3 

Forwards copies of pages 1&2 to FBAR Amend 37. Corret mend 

number on page 1, originally submitted on 790124, 

OILLELAND, J. B. Tennessee Valley Authority. 79/01/30. 3pp. 

7902200040 DOCKET 30-391 Watts Ber Nuclear Plant. Unit B 
Forwards affidavit certifying that on 790203, Amend 37 to 
FSAR ua served upon identified individual*. 
MILLB.L.n Tennessee valley Authority. 79/OB/OH. 2pp, 

7902210136 DOCKET 30-391 Watts Bar Nuclear Plant, Unit S 
Forwards IE Insp Hepts 50-390/7B-31 ti 30-391/7B-S6 on 
7B112B-1S01 t< notice of violation. 

MURPHY, C. E. Region 2, Atlanta, Reactor Construction t> Engineer Ine 
Support Branch. 7B/1B/22. 2pp. 

7902210139 DOCKET 90-391 Watts Bar Nuclear Plant, Unit S 
Notice of violation from insp an 7B11HB-1201. 
MURPHY.C.E. Region 2, Atlanta, Reactor Construction fc 
Engineering Support Branch, 70/12/22. Hpp, 

7903310143 DOCKET 30-391 Watts D ar Nuclear Plant, Unit 2 
IE Insp Rapts 30-390/78-31 !. SO-391/7B-S6 on 781138-1301. 
Noneompllance noted:no interpass temp checks mere being 
performed on melding storage area. 

CONLON, T. E. Region 2, Atlanta, Reactor Construction 4t 
Engineering Support Branch. 78/12/22. 9pp. 

7902270137 DOCKET 30-391 Watts Bar Nuclear Plant, Unit 2 
Ack receipt of 790116 Itr informing NRC of steps taken to 
correct violations notad in IE Insp Rept 30-390/7B-31 t, 
30-391 /7B-26 , 



7902270161 DOCKET 3O-391 Watts Bar Nuclear Plant, Unit tt 

2El!n 1 y C J alMa Ur r " vlol " tl ^ not.d in IE In.p 
Rept 30-390/7B-31 S, 30-391/7B-26. Corrective actions' 
storaje on insp checklist has been revised to comply u/ 
n?, B i C c, * u $".'r Vi "l P"""""."! have been re- instructed. 
OILLELAND.J.E. Tennessee UalUy Authority. 79/01/16. Spp. 

7902120030 DOCKET 30-391 Hatts Bar Nuclear Pl-nt, Unit 2 



3h - 

Shock t Suag Arrestors (HBSA) 



on Hrauic 



79/02/02."''2pp 



A " 4n **' Offlce of th Director. 



79022B0134 DOCKET 30-371 Watts Bar NuUear Plant, Unit 2 

Limrr^i^'^^r.. 79 - 03 ' " Llmit v - s - 

79/02/09! J '2PP. R 9i n S ' M1 * nt ' "" -f f. Direc 
79032B0343 DOCKET 30-391 Watts Dar Nuclear PUnt, Unit B 



OILLELAND.J.E. Tenn ..... Valley Authority. 79/02/20. Spp. 



7 , ss: s^^^.SkciT^^'sv^'r unit 
RE Wg s i'r u L ty t ^ r v ?, au -' !: "-' ." pl1 

CREWg.E.H. south Carolina Electric fc oa. Co. 79/01/13. Spp. 



R s - 

R.R.L. LHht Water Reactors Branch 3. 79/01/23. 4 PP 



Division of Project Management. 77/O 



77/O1/30. C3pp. 



BOYD.R.8. Diyi s ion of Project Management. 



79/01/30. 4pp. 



79/01/3O. B p p , 

-'"-' """ ' 

tors Branch 2. 



DOCKETED ITEMS 



111 



7902370433 DOCKET 50-399 Virgil C. Summer Nuclear Station. Unit 1 
Negative declaration supporting extension of CPPR-94. EIS is 
unwarranted. 
BALLARD.R. L. Environmental Project Branch 1. 79/01/30. Spp, 

7902270439 DOCKET 5O-39S Virgil C. Summer Nuclear Station, Unit 1 
EIA supporting eitension of CPPR-94 to B01S31. Describes 
proposed DC tion, discusses need for power, social !< economic 
impacts based an FEB. No EIS is required. 

Division of Site Safety d Environmental Analgsis, 79/01/30 
4pp. 

790221021H DOCKET 80-393 Virgil C. Summer Nuclear Station, Unit 1 
Forward* Technical Rept 79-3 "April-Juno 1970 Seisroieity 
Niar VC Bummer Nuclear Station-" requested by Kellehor of 
Ovoscience Div, 
CREUS.E.H. South Carolina Electric !. Qas Co. 79/02/09. ip. 



7903210222 DOCKET 50-395 Virgil C 
Tochnlcal Rept 79-2. "April-Jun 
Summer Nuclear Station." 
* South Carolina Electric t> Qaa Co 



Summer Nuclear Station. Unit 1 
1978 Seismicity Near VC 



Tft 79-2. 79/02/2B. lOOpp. 



7902320045 DOCKET 50-393 Virgil C. Bummer Nuclear Station, Unit 1 
Fllei updated piezometer & settlement readings fur svc mater 
pumphouse. b intake structure. 
CREHSrE. H. South Carolina Electric & Qas Co. 79/O2/13. 13pp. 

7902140463 DOCKET 30-395 Virgil C. Summer Nuclear Station, Unit 1 
Forward i NUFiEO/CR-0400. "Rl sh Assessment Revieui Group Rept 
to the USNRC'MLewls Rept ), provi d ing recommendations for use 
of risk assessment methodology & assessment of WASH-140Q. 
ODLDBEROi 8. C. Off ltd of the Eiecutive Legal Director. 79/01/23. 
Ip. 

79021S0113 DOCKET 90-395 Virgil C. Summer Nuclear Station, Unit 1 
Forwards BAND77-1927, "Transport of Radionuc 1 ides in Urban 
Environs: Work ing Draft Assessment. " W/o end. 

QOUDDERG. S. C. Office of the Eiecutive Legal Director. 79/01/35. 
2pp. 

790312014.2 DOCKET 90-393 Virgil C. Summer Nuclear Station, Unit 1 
Forward* Endorsement 11 re changes in subscribing companies 
fc their proportionate liability endorsement to NHL I A Policy 
NF-292. 
FIELDER, J. Marsh d McLennan, Inc. 79/02/06. SPP. 

7902010117 DOCKET 30-395 Virflil C. Summer Nuclear Station, Unit 1 
Forwards Amend 11 to FBAR. 
CREUB.E.H. South Carolina Electric E< Gas Co. 79/01/31. Ip. 

7902010132 DOCKET 90-393 Virgil C. Summer Nuclear Station. Unit 1 
Amend 11 to FBAH. Discusses condensate fc feeduater SUE, 
environ design of mechanical b electrical equipment. abnormal 
accident conditions, qualification test results & transient 
analysis. 
* South Carolina Electric & San Co. 79/01/31. 390pp. 

7903200074 DOCKET 30-395 Virgil C. Bummer Nuclear Station. Unit 1 
Forwards FBAR Amend 12. 
CREWa.E. H. South Carolina Electric S. Oaa Co, 79/02/18. 2pp. 

7902H00075 DOCKET 90-39S Virgil C. Summer Nuclear Station, Unit 1 
Amend 12 to FBAR, Pages updated. 
" South Carolina Electric fc Qas Co. 79/02/13. 323pp. 

7903020010 DOCKET 30-395 Virgil C. Summer Nuclear Station, Unit 1 
Adjudlcatory/consent calendar items to inform NRC of end 
petition for finding of significant changes to require 
antitrust review. Recommends schedule to allow Central 
Electric Power Cooperative to support its petition. 

KELLEY, J. L. DPfice of the General Counsel. SECY-A-79-4, 77/01/11. 
17pp. 

7902140073 DOCKET 90-393 Virgil C. Summer Nudoar Station, Unit 1 
Forwards errata sheet re corrections in SC Public Svc 
Authority's motion to dismiss or motion for summary 
disposition re petition by Central Electric Power 
Cooperative, Inc dtd 790113, 
MORRISON. H. P. Cahilli Gordon !e Roindel. 79/01/23. 4pp. 

7903260146 DOCKET 90-395 Virgil C. Summer NuclBar Station. Unit I 
Forwards "Errata Sheet" of corrections to 790119 motion to 
dismiss. or in the alternative, motion for summary disposition 
of BC Public Svc Authority, Errata sheet t, Certificate of 
Bvc oncl. ; , 

HORRIBON,H. P. Cahill, Gordon t. Reindel. 79/01/23. 4pp. 



79020B0309 DOCKET 50-395 Virgil C. Summer Nuclear Station, Unit 1 
In response to 7B1206 Central Electric Power Cooperative 
petition Fur antitrust revi em. orders petitioners t. 
applicants to provide addl Info per stated schedule. 
CKILK.S.J. Office of the Secretary of the Commission. 79/01/26. 
3pp. 

7903130042 DOCKET 90-393 Virgil C. Summer Nuclear Station, Unit 1 
Central Electric Power Cooperative amended petition far 
finding of significant change t, opposition to motions to 
dismiss or for summary di sposi t ion. Certi f icate of Svc. 
affidavit b two eihibits end. 
BRAND. W. E. , HALL, E.G. Pearce t. Brand. 79/01/31. 72pp. 

7902090392 DOCKET 30-39S Virgil C. Summer Nuclear Station, Unit 1 
Forwards IE Insp Rept 50-393/7B-31 on 7B1213-15. No 
none amp lionce noted. 

MURPHY, C. E. Region 2, Atlnnta. Reactor Construction t. Engineering 

Support Branch 78/12/39. 3pp 

7902090393 DOCKET 30-399 Virgil C. Summer Nuclear Station, Unit 1 
IE Insp Rept 50-395/78-31 on 7B1213-15. No nencomp 1 ianc e 
noted. Major areaa inspected : design veri f ica t ion, c oiitro 1 !. 
interfaces 

HEflDT, A. R. i HUfiDETTE.T. E. Region E, Atlanta, Reactor 

Construction d Engineering Support Branch. 7B/12/29. 3pp. 

790309008B DOCKET SO-393 Virgil C. Summer Nuclear Station, Unit 1 
Ack receipt Of NRC Audit Rept 50-31S/7B-3] on 7B1229. Nd 
proprietary info. 
JOHNSON. M. C, South Carolina Electric t Gas CD. 79/O1/31, Ip. 

7902220233 DOCKET 50-39B Virgil C. Bummer Nuclear Station, Unit 1 
Forwards revised pages to NRC 7B1311 Itr forwarding IE Insp 
Kept 50-393/78-27. 

MURPHV.C.E, Region 2. Atlanta, Reactor Construction !< Engineering 

Support Branch. 79/01/31. Ip. 

7902220236 DOCKET 50-393 Virgil C. Summer Nuclear Station, Unit I 
Forwards IE Insp Rept 30-395/70-27 on 7BI 127-30 (. notice of 
violation. U/G encl, 

MURPHY, C.E. Region 2, Atlanta. Reactor Construction !i 

Engineering Support Branch. 7B/13/14. 2pp. 

79023B0336 DOCKET 50-395 Virgil C. Bummer Nuclear Station, Unit 1 
Forwards IE Bulletin 79-01. "Environ Qualification of Class 
IE Equipment." Vl/list of 11 systematic evaluation program 
plants for tiihich no action is required. 

O'REILLY. J, P. Region 2, Atlanta, Office of the Director. 

79/02/OB. 2pp. 

7902260533 DOCKET 90-395 Virgil C. Buimnor Nuclear Station. Unit 1 
Forwards IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment, " W/l ist of 11 systematic evaluation program 
plants for uhich no action is required, 

O'REILLY, J. P. Region 2, Atlanta, Office of the Director. 

79/02/OB. 2pp. 

79032B0129 DOCKET 50-395 Virgil C. Summer Nuclear Station, Unit 1 
Forwards IE Info Notice 79-03, "Limitorque Valve Geared 
Limit Switch Lubricant, " 

O'REIU-Y. J, P. Region 2, Atlanta, Office of the Director 

79/02/09. 2PP. 



79023B01E7 DOCKET 90-395 Virgil C, Summer Nuclear Station, Unit 1 
Forwards IE Info Notice 79-03, "Limltorque Valve Geared 
Limit Switch Lubricant. " 

O'REILLY, J. P. Region 2. Atlanta, Office of the Director. 

79/02/09. IP. 



7902220214 DOCKET 30-39i Univ. of Virginia Cavalier Reactor 
Forwards IE Insp Ropts 50-062/78-03 t- SO-396/7H-O2 on 
78112B-30 & notice of violation. 

LONS.F.J. Region 2, Atlanta, Reactor Operations Nucloor Support 

Branch. 7B/12/1B. 3pp. 

7902220246 DOCKET 30-396 Univ. of Virginia Cavalier fleactor 
Notice of violation From insp on 7B112B-30. 

LDNOiF.J. Region 2, Atlanta, Reactor Operations Nuclear Support 

Branch. 78/12/10. Ip. 

7902220290 DOCKET 50-396 Univ. of Virginia Cavalier Reactor 
IE Insp Ropts 50-062/78-03 !* 50-396/7Q-O2 on 7B112B-30. 
Noncompl iance noted. Reactor Safety Committee approved 
procedure revision resulting in reactor operating from 
7B1033-1128 til/ EC ram switch inoperable, 

LEWIS, R.C. Region 3, Atlanta, tteactor Operations Nuclear 

Support Branch. 7B/12/1B. 5pp. 



112 



DOCKETED ITEMS 



7903270121 DOCKET 50-39* Univ. of Virginia Cavaliar Reactor 
Forwards IE Insp Ropt* 5O-Oia/7B-O4 & 50-396/7B-O3 on 
731228-29. No nonconpliance notod, 
KEMNA.H.B. Regions. Atlanta. Safeguards Branch. 79/01/12. 



3pp. 



7902030300 DOCKET SO-397 WPPSS Nuclear Project, Unit S 
Notice of appearance by RK. Hoefllng on behalf of NRC 
Certificate oF Eve and. 

HDEFLlNfl, R.K. Office of the Eiecutive Legal Director 
3pp. 



79/01/19. 



7903370136 DOCKET 50-396 Univ. at Virginia Cavalier Ractor 
IE In if, Ftepts 30-062/73-04 ti 3D-396/7B-03 on 7OiaEB-a9.No 
nancompllance noted. Major area inpc ted: phy sica I security 
program. 

flESECKEH.K. H. , OILLEBP IE. F. P. (legion 2. Atlanta. Safeguard- 

Oranch. 79/OI/11. 3pp.. 



7702060133 DOCKET 3O-397 HPPSB Nuclear Project. Unit S 
NF1C responses to 79011O intervenar requ.it for waiver of 
requirement for double spacing of documents. NRC hai no 
objection. 
PATON.W, D. Office of thin Eiecutiv* Legal Director. 79/0 



79O1310169 DOCKET 50-397 HPPSS Nuclear Project, Unit 2 

Act receipt fc eipreises appreciation For 7B1219 & 77Q1Q2 

I*T re ATWS mods t occupational eiposure. 

MATTSONjR.J. Division oF Sustains Safety. 77/01/18. Ip. 

790S090343 DOCKET 5O-397 UPPSS Nuclear Project, Unit 2 

Forwards <JE topical repl NEDO-24010-2. Supp 1 2.. "Has BE for 
Critria for Combination of Earthquake t Other Transient 
Response! by the Square-Root-Sum-Of-Tho-Squares Method. " 
Bent is provided on behalf of Mark 2 owner'* group, 
SDDOM.L.J. General Electric Co. .Nuclear Energy Products Div 
79AJ2/OS. Ip. 



7?0223O2&1 DOCKET 3O-397 WPPB9 Nuclear Project, Unit 2 
fliidl contention t, legal argument pursuant to ABLD 790129 
permission. Contends inadequate assessment of safety risti 
Certificate of Svc encl. 
DAfiBV.C. Affiliation Unknown. 79/02/01. 3pp. 

7902130127 DOCKET 30-397 MPPS8 Nuclnar Project, Unit S 

Requests one copy of NRC requests for addl inFo be sailed 
directly to address of OK Eerie during license revUu to 
expedite responses. 
RENBEHOER.D. L. Uashlngtnn Public Pouer Supply Systen. 79/03/O4 



7903090367 DDCKET 30-377 WPPSS Nuclear Project. Unit S 

Buppl 9 "Basis For Criteria for Combination oF Earthquake & 
Other Transient Responses By the Sq u are-Poo t-Sum-nf-th n- 
Squares Method. " Discusses method fnr combining multiple 
peak dynamic responses for blasts fc earthquali *=. 
KENNEDY, R. P. Heneral Electric Co. .Nuclear Energu Product* Div 
7S/13/31. 30pp. 



7702060330 DOCKET 50-3<J7 WPPSS Nuclear Project- Unit 3 
Forwards Amentf 3 to Environ Rept. 

RENHERCEfl. 0. L, Uashiflffton Public Power Supply BustBn 
2pp. 



79/01/31. 



7903360038 DOCKET 3O-397 WPPB8 Nuclear Project. Unit a 
Forwards IE Insp Rept 30-397/70-14 on 781B19-30. No 
noncompl iance noted. 

SPENCER, D.S. Region 3, Ban Francisco, Reactor Construction t 

Engineering Support Branch. 79/O1/OH. 2pp. 

7902260013 DOCKET 50-397 WPPBS Nuclear Project, Unit 2 
IE Insp Rept 30-397/7Q-M on 781319-30. No noncompl lance 
noten. Major area! inspec ted : site const ctivitlei involving 
nnndestructivo elimination of ueldi. 

BISHOP.T.U., HAYNES.R.C. Region 3, San Francisco, Reactor 

Construction & Engineering Support Oranch. 79/01/03. 9pp. 



7902040324 DOCKET 50-3?7 WPPS9 Nucli 
Amend 3 to Environ Rept. 
* Washington Public Power Supply 



Project. Unit 3 



79/O1/31. flfcpp. 



7902330041 DDCKET 5O-397 UPPSS Nuclear Project, Unit 2 

InFormi that TRADOC Pamphlet 350-30, "Interaervic e Procedures 
for Instructional Sys Development" referenced in NUREO-Q317 
is available in microfiche form from NRC. 
H8AW,H. J, Division oF Document Control. 7B/ 1 1 /20. 



3pp. 



7902040011 DDCKET 30-397 WPPSS Nuclear Project, Unit 2 
Foruird* latest revisions of NRC review guidelines & 
security plan evaluation rept workbook. Add 1 info re 
security flan needed For revleu to c ontinue. Round 1 
questions to be issued after receipt of revised plan. 
VAflCA.S.A. Light Water Reactors Branch 4. 79/O1/1H. 



150pp. 



7902230073 DOCKET 50-397 HPPSB Nuclear Project. Unit 2 

Notification of 790313 raeoting u/WPPSB fn Dethtsda.MD re 
itepi to fee taln to improve Unit 2 rept on physical 
lecurity plan. 
LYNCH, H. D. Light Water Reactors Erancti 4, 79/O1/3O. 2pp. 

7901230037 DDCKET 50-397 UPPS3 Nuclear Project, Unit 2 

.Forwards NUREO/CH-(MOO, "Ri at Assessment Review Group Rapt to 

tha US NHC"[LeulB Rep t ), providing recommendations for use of 

risk asiessnenb methodologij t. assnament of UASH-14OO, H/o 

encl. 

PATON.M. D. Office of the Eiecutive Legal Director, 77VO1/1O. 

790204,0045 DDCKET SD-397 HPPSS Nuclear Project, Unit 3 

Second amended petition to 1 ntervane. supplementary except 
where noted. to 7E91115 petit i on Addresses contentions re need 
for pouer, al ternatives. Notice of ui thdryal , affidavit fc 
CertlFlcate of Sve end. 
GAHRETT.S. M- Hanford Convirilon Project. 79/O1/IO. 8pp. 

79030i0051 DOCKET 5O-397 WPPS3 Nucle-ar Project, Unit 2 
Rnuejts malver of double-spacing requirement for filed 
documents because of added erpenie. Assures that documents 
uill be legible. H/uncl Certificate of SVc. 
CARRETT. S. M. Hflnford Conversion Prajett. 79/O1/10. Ip. 

7702050849 DDCKET 50-397 yPPSS Kuclear Project, Unit a 
Ruponds to 7901O1 Itr rn.ueating opportunity to make 
HiBltDd appearance at public hearing. Informs that no date 
has uet been set. Written matl to be Incorporated into record 
as fart of statement should be addressed to ASLD. 
PATCN.H.D, Office of th EnecutivB Lenal Director. 79/01/15 



2pp. 



790B2A0030 DOCKET 3O-397 WPPSS Nuclear Project, Unit 2 
Forwards IE Imp Rept 30-397/70-11 on 7fllll4-17.No 
noncompl iance noted. 

SPENCER. 0.8. Refion 3,, Ban Francisco, Reactor Construction fc 

Engineering Support Dranch- 79/01/09. 2pp. 

7902340034 DDCKET 30-397 UPPBS Nuclear Project. Unit S 
IE Insp Rapt 3O-397/70-1 1 on 7D1 114-17, Mo nonconallante 
noted. Major areas inspe,c ted; cons t activities including 
observations of -tafBty-related piping work It review of 
quality records. 

BISHOP, T.H., vDHDEHnrtUECOEN Regions, Ban Francisco, Office of 

the Director. HAYNEB.R.C. Region 3, Sen Francisco, Reactor 

Construction t Engineering Support Branch. 79/01/OB. 12pp. 

7902120142 DDCKET 30-397 WPPSS Nuclear Project. Unit 2 
Forwards IE Info Notice 79-01. "Berjen-Patenon Hydraulic 
Shock b Sway Arresters (HBSA). " 

ENOELKEN.R. H, Region 3, San Francisco, Office of the Director. 

79/02/02. 4pp. 

7902120148 DDCKET 30-397 HPPBS Nuclear Project, Unit 2 
Forwards IE Info Notice 79-01, "Bergen-Pmterson Hydraulic 
Shock t, Sway Arnstors <HS9M. " 

ENOELKEN. Fl. H. Region 3, San Francisco, Office of the Director, 

79/02/02. Ip. 

7902330071 DOCKET 30-397 WPPSS Nuclear Proj.ct, Unit 2 

Forwards IE Bulletin 79-01. "Environ Qualification of Class 
IE Equipment." H/ltst of 11 9ij*Utic evaluation program 
plants for which no action is required. 

'ENOLEKEN, H. H. Region 5. Ban Francisco, Office of the Director. 

79/03/09. Ip. 

7902270393 DOCKET 30-397 WPPSfl Nuclear Project. Unit S 
Forwards IE Info Notice 79-03, "Li mi torque Valve 0ared 
Limit Snitch Lubricant." 

ENGLEKEN.F.H. Region 3, San Francisco. Office of the Director. 

79/02/09. Ip. 

7902130469 DDCKET 3O-397 WPPS8 Muclear Project, Unit S 
AcV receipt of 790117 Itr Forwarding deficiency rtpt. 
ENOELKEN, R. H. Region 3, San Francisco. Office of the Director. 

79/01/30. Ip. 

7902070044 DOCKET 30-397 WPPSS Wuclear Project. Unit a 

Transcript of 790123 prehearing conference In Rlchland,MA. 

Pp 1-123. 

nOWERB.E.S.. HILL.E.E., COLE.fi. F. Atonic Safety and Licensing "0rd 

Panel. 79/OI/25. 12ipp. 



DOCKETED ITEMS 



113 



7902360120 DOCKET 3O-397 WPP S3 Nuclear Project. Unit 3 
Applicant'* proposed corrections to transcript of 79Q133 
preherina conference. Certificate of Svc encl. 
REYNOLDS, N. 8. Debtvulse & Lieberman. 79/O2/Q6. 9pp. 

79020B0227 DOCKET 3Q-4OO Bhearon Harris NucHar Pooler Plant. Unit 1 
Forwards ript on micaceous gneiBi layer & schistose rone 
requested by NHC during 761 EOS imp of main tan coretrench. 
Concludes nlcaceous gneiia layer & schistose lone cannot be 
capable of fault*. U/photo b Pour overall* drauingc. 
rtCDUFFIE, H. A. Carolina Power K Light Co. 79/O2/O2, 12pp. 



7902010296 DOCKET 5O-4OO Shaaron Harris Nuclear Power Plant. Unit 1 
Submits petition on behalf of Kud 1 u Alliance Far reopened nr 
remanded further hearings EC petition to suspend const 
pending resolution OF neu evidence & updating neu estimates. 
EDDLEMAN. U. Affiliation Unlnouin. 79/O1/17. 7pp. 

7-JO305OOBB DOCKET 50-4OQ Shear-on Harris Nuclear Pouir Plantn Unit 1 
Appeals ASLB 790110 order denuinn petition's to intervene as 
general intervenor in safe mgt capability hearlng filed by 
Kudiu Ei H Eddleman. 
EDDLEMAN, W. Kudiu Alliance. 79/Q1/17. 23pp. 



7702330046 DOCKET 90-400 Shear on Karris Nuclear Pnwer Plant. Unit 1 
Forward i teil repti a* requested bu. O Thompson re randan 
rockfill. 
MCDUFFIE. M. A. Carolina Pauer b Light Co. 79/O2/O2. Ip. 

7902230072 DOCKET SO-40O Bhearon Harris Nuclear Power Plant, Unit 1 
Large Scale Triaxial Shear- & Permeability Tests." Forward* 
results of 13 inch diameter consolidated undralned trlaiial 
shear test, grain site analysis & 14 Inch diameter constant 

head permeability tests. 

Consumers Pouer Co. 75/04/30. 2Bpp. 

790S22O074 DOCKET 30-400 Bhearon Harris Nuclear Power Plants Unit 1 
"Excavation. Backfill. Fill ing Ic Grading. " Specifications for 
eieavatlon, foundation preparation b backfill for plant area 
faldgs>all reservoir concrete structures & filling b grading 
In plant area. 
Consumers Pouer Co. 79/01/02. 16pp. 

7902230073 DOCKET 90-400 Shearon Harris Nuclear Power Plant* Unit 1 
"Embankments. Dans. Dikes. & Channels." Specification cover* 
strlppling of base for embankments, excavation of cutoff 
trenches, channels, preparation of embankment foundation & 
placement of embankment matl In Class r dami. 

* Consumers Pouer Co. 79/Q1/OB. 24pp. 

7902320076 DOCKET 50-400 Bhearon Harris Nuclear Pouer Plant; Unit 1 
"Bandon Rockfill Matl Test VR-24-4-1. " Contains results of 
test fill VR-24-4-1 which includes large volume in-place 
density test & grain slle distribution tests. 

* Consumer! Power Co. 78/12/21. 57pp. 

7902220077 DOCKET 30-400 Bhearon Harris Nuclear Power Plant, Unit 1 
"Random fioclrflll Matl Test VR-24-4-2. " Contains results of 
test fill VR-Sfl-4-B uihich includes 2 largo volume In-place 
density testa & grain tits distribution tests. 

* Carolina Power b Light Co. 78/12/20. 40pp. 

7702090240 DOCKET 5O-40O Bhearoti Harris Nuclear Pouior Plant- Unit 1 
Response to 790103 request providing tables & Individual 
plant summaries from draft NIWEQ-O366 "Nuclear Pnuer Plant 
Operating Experience For 1977." 
BARTH.C.A. Office of th Executive Legal Director. 79/O1/O4. 



7905230109 DOCKET 30-4QO Shearon Harris Nuclear Pouer Plant, Uni 
Amend to petition to intervene. Elaborates on M Eddleman & 
Kudxu Alliance Interest In proceeding b lists Issues 
previously raised. 
EDDLEHAN, M. fift 11 iation Unknown. 79/01/04. B3pp. 

7902020007 DOCKET 50-40O Bhearon Harris Nuclear Power Plant. Uni 
Forwards documents as requested in 7Q122O 1 tr: WASW-1130. 
rvled US AEC(1973) "Util Staffing t Training for Nuclear 
Power." Reg Guide 1. B, & NUflEQ OO94 "HRC Operator Licensing 
Ouide. " 
BARTH.C.A. Office of the Executive Legal Director. 79/01/OS. 



31pp. 



2pp. 



7902090283 DOCKET SO-40O Shearon Harri* Nuclear Pouer Plant. Un 
Motion bg Intervenori Conservation Council of NC It WaJte 
Environ. Inc far Commission to remand to A8L8 the inue r 
need For proposed unit uithin time Frame per const permits. 
.Certificate of Svc end. 
EHHIN.T. 8. Eruin. T. 8. 79/01/OB. -3pp. 

7901190211 DOCKET 30-400 Shearon Harris Nuclear Pouer Plant. Un. 
Ack receipt of NRC 790109 Itr re proceeding & resubmits 
App Ai B & C as requested. 
REIB.E.J. Office of th Executive Legal Director. 79/01/11, 



16pp. 



79O203OOI4 DOCKET 50-4OO Bhearon Harris Nuclear Power Plant, Unit 1 
Applicant's response to Conservation Council of NC ( Wake 
Environ Inc notion to remand to ASLB for Further Ji ear ing a. 
Sees no sense in reopening need for power i ssue U/photos. 
aff IdavitfCertif icate of Svc E> Capacity Plan. 

TROHBHIDGE, 0. F. SJiau. Pittraan. Potts. & Troubririge. 79/01/S3. 
166pp. 

790206O137 DOCKET 3O-4OO Bhearon Harris Nuclear Power Plant, Unit 1 
Applicant's response to IntBTVeno-rs ' 79010B motion to remand 
to ASLB fnr hearings re neod Par f auer lasue. Urges motion be 
tfonied' due to economic ISSUE & cost to applicant. M/ 
affidavit of KA Duf f ie. re lated info t Certificate of Svc. 
TF10UBR1DOE, 0. F. Sbaia, Pittman, Potta. & Troubridge. 79/O1/33. 
27pp. 

7902050378 DOCKET 5O-4OO Shearoti Harris Nuclear Pouier Plant- Unit 1 
Notice of continuation on. 790237 of hearing re rngt 
capabilities of app 1 leant. Hearing will be held In Raleigh. 
NC. 
SMITH. I. W. Atonic Safety and Licensing Hoard Panel. 79/01/24. 2pp. 

79D2060O&O DOCKET HO-4QO Shearon Harris Nuclear Pcuer Plant. Unit 1 
Informs that const permit protending Is pending eicept for 
mgt capability issue, Forwards memo From NRC geologist re 
faulting at site. Several faults have been noted] none get 
proven capable. 
BARTH.C.A. Office of the Emcutive Legal Director. 79/01/2*. Ip. 

79O206OO6O DOCKET 3Q-4OO Shaaran Harris Muclear Pouer Plant, Unit 1 
Informs that const permit proceeding ift pending eicept POT 
ngt capability Issue. Fcruiar da memo from NRC geologist r 
Faulting at i i te. Sffweral faults have been natedinone yet 
proven capable. 
BAHTH.C.A. Office of the Eiccutive Legal Director. 79/01/3o. Ip. 

79OB120190 DOCKET SO-400 Shearon Harris Nuclear Pouer Plant. Unit 1 
Responds to NJtC 761330 1 tr to Kurt r need for power from 
proposed lite. Del 1 eves trUtJi IE missing from administrative 
proceedings. C lalms forecasts have bee-n consistently too 
high. 
EDDLEMAN, U. Affiliation Unknown. 79/O1/S7. 3pji. 

79O22&DO79 DOCKET 5Q-4OO Shearon Harris Nuclear Power Plant, Unit 1 
Requests that hearings on safe nig t capabilities in 
operation! of nuclear facilities, to begin 79O227 in Raleigh 
NC, be held in evenings after 6pm or on uoekends. as 
originally promised, to facilitate public participation, 
BAOCETT.P.fl. Af Fill at ion Unknown. 79/OB/27. Ip. 



79O2030OH7 DOCKET 5O-4OO Bhearon Harris Nuclear Power Plant. Unit 1 
NRC apposition to intervenars ' motion to- remand proceeding 
to A5LD Far further evidentiary hearings on need for four 
nuclear power reactors. Recommends motion be denied. 
Certificate of Svc end. 
EARTH, C. A. Office of the Executive \-tgal Director. 79/O1 /29. hep. 

79022B009O DOCKET 3O-4OQ Shenron Harris Nuclsar Power Plant, Unit 1 
Forwards JE Info Notice 7?-01. "Dergen-PatersDn Hydraulic 
Shock t> Buay Arresters (HS5A). " 

0'REILL.Y. J. P. Region 2. Atlanta, Office of the Director. 

77/03/O2. 3jtp, 



79O22B052O DOCKET 50--4OO Shearon Harris Nuclear Payer Plant, Unit 
Forwards IE Bulletin 79-01. "Environ Qual if itation of Class 
IE Equipment. " U/liat of 11 systematic evaluation program 
plants for which no action is required. 

O'REILLVfJ. P Region 2, Atlanta. Office of the Director. 

79/02/OB. Snp. 



7902010296 DOCKET 30-400 Shearon Harris Nuclear Pouer Plant, Unit 1 
Submit i petition on behalf of Kudiu Alliance for reopened or 
remanded further hearings !< petition to suspend const 
pending resolution of neu evidence b updating new estimates. 
EDDLEMAN, W. Affiliation Unknown. 79/01/17. 7pp. 



770328O092 DOCKET 30-40O Shoaro-n Harris Nuclear Poiaer Plantr i 
Forwards IE Info Notice 79-03, "LimitornuB Valve 'Oeared 
Limit Bui itch Lubricant." 

O'REILLY, J.P- Region 2, Atlanta, Office of the Director. 

79/02/O9. 3p f . 



114 



DOCKETED ITEMS 



7=7O2O8O227 DOCKET SO-4O1 Shearon Harris Nuclear Power Planti Unit S 
Forwards rep t on nicaceous gneiss l^^er L schistose *one 
requested by NRC during 7B120B insp of main dam core trench. 
Concludes micaceous gneiss layer !. schistose lone cannot be 
capable of f au 1 ts. U/phcto l< -four oversiie drawings. 
HCDUFFIE. M. A. Carolina Power ?, Light Co. 79/03/02. 12pp. 



7902030014 DOCKET 5O-401 Shearon Harris Nuclear Power Plant. Unit 
Applicant's response to Conservation Council of NC & Uike 
Environ Inc motion to remand to ASLB for further hearings. 
Bees no sense in reopening need for power 1 BSUB. U/phataa. 
affidavit. Certificate op Svc & Capacity Plan. 
TROWHRIDGE,Q. F. Shaiu. Pittmam Potts, 4, Trowbridge. 79/01/23, 

Ifibpp. 



7903330066 DOCKET 3O-4O1 Shearon Harris Nuclear Power Plant. Unit 2 
Forwards test reptE as r-equeated by Thompson re random 
rockfill. 
riCDUFFIE,M. A. Carolina Pouier !, Light Co. 79/02/O3. Ip. 

7903330072 DOCKET 30-4D1 Shearon Harris Nuclear POUIBT Plant, Unit 2 
"Large Scale Triaiial Shear (c Permeability Tests. " Foruiards 
results of 19 inch diameter consolidated undrained trial ial 
shear test, grain siie analyses d 14 inch diameter -constant 
bead permeability tests, 
+ Consumers Power Co 73/04/30. 2Bpp. 

7902330074 DOCKET 30-4OI Shearon Harris Nuclear PUIUET Plant, Unit 2 
"Eicavat ionrDaclcfi ll.Fi lling R Grad i no. " Specifications for 
Bicavat ion, fcundat I on preparation 6 backfill for plant area 
bldgs,all reservoir concrete structures & filling & grading 
in plant aroa 
" Consumers Power Co. 79/01/02. 16pp. 

7<?O2=aO075 DOCKET 50-4O1 Shearon Harris Nuclear Power Plant, Unit 2 
"Embanliwnts, Dams, Di kes, & Channels." Spec i f ication covers 
strlppling of base for erabankmen ts. e< cavat ion of cutoff 
trenches, channels, preparation of embankment foundation ti 
placement of Embankment mat] in Class i dams. 
Consumers Power Co. 79/OI/OB. 2-lpp. 

7902220074, DUCKET 50-4O1 Shearnn Harris Nuclear Power Plant. Unit 2 
"Fiandom Roctflll Matl Test yn-24-4-I," Contains results of 
test fill VR-24-fl-l uhlch includes large volume in-place 
fleniitij test t< grain slin distribution tests. 
" Consumers Power Co. 76/13/31. 57pp. 

7TO3230077 DOCKET 50-101 Shearon Harris Nuclear Pmupr Plant, Unit S 
"Random Roc If 1 11 Mat! Tost VFt-24-fl-a, " Containa results of 
test fill VH-24-4-2 mhicfi includes 3 large volume tn-place 
density teits !i grain siie distribution tests. 
* Carolina Pouier t. Light Co. 7B/12/20. 40pp. 

7901190211 DOCKET 50-4O1 Shftaron Harris Nuclear Power Plant. Unit 2 
rtck receipt of NRC 790109 Itr re proceeding t. resubnits 
A.pp A, D ft C as rcqueatDti. 
REIS.E.O. Office of the Executive Legal- DI rector. 79/01/11. l&pp, 

7905O50240 DOCKET SO-1O1 Shearon Harris Nuclear Power Plant, Unit 2 
Response to 79G1O2 request providing tables (c individual 
plant summaries from draft MUREC-O36A "Nuclear Pnuer Plant 
Operating Eipcrience for 1?77. " 
BARTH, C. A. Office of the Eiecutive Legal D-ircctor. 79/01/04. Slpp. 

7903230103 DOCKET SO-10 1 Shflaron Harris Nuclear Power Plant. Unit 2 
Amend to petition to i ntevvo-ne. Elaborates on W Eddleman t< 
Kudiu Alliance internst in proceeding d lists issues 
previously ralsetf 
EDBLEHAN.W. Af f 1 1 iat ion, Ktilinciuin. 79/01/04. 35pp. 

7902020007 DOCKET 30-101 Sbearon Harris Muclear Power Plant, Unit H 
Foriuarrfs dncuments HS roquested in 731220 1 tr : WASH-1 130. 
revised US AECU973I "Utll Staffing . Training for Nuclear 
Power, " Re-j Ouide 1. B, t NUREQ OQ94 h 'NF!C Operator Licensing 
Ouide. " 
BflRTH, C. A Office of tlie E.ecutive Legal Director. 79/01/05. Spp. 

7903090333 DOCKET 3O-401 Shearon Harris Nurlaar Pouier Plant, Unit 3: 
Motion by intarvenora ConsBTvation Council of NC ti Hake 
Environ, Inc for CeraniEBion to remand tn ASLB the iosue re 
need for proposed unit within time frame per const permits 
Certificate of Svc end. 
ERWIN, T. S Eruin, T. S. 79/01/OB. 5pp. 

790301029;. DOCKET 50-401 Ehearon Harris Nuclear Power Plant, Unit 2 
Submits petition on behalf of Itudiu Alliance for reopened or 
remanded further tioaripigs & petition tn suspend const 
pending resolution of new evidence ?. updating nem estimates 
EDDLEMrtN,U. Affiliation Unknown. 79/OJ/17 7pp. 

79020500BB DOCKET 50-401 Sfiearon Harris Nuclear Power Plant, Unit 2 
Appeals A3LD 79O110 order denying petitions to intervene as 
gencraB intervenor in safe mgt capability hearings filed by 
Kudzu 6 U Eddleman. 
EDDLEMAN, W, Kudiu Alliance. 79/01/17. 23p p 



790206O137 DOCKET 30-4O1 Shearon Harris Nuclear Power Plant, Unit H 
Applicant's response to intorvenars ' 79010B motion to remand 
to A3L6 for hearings re need for pouier issus.Urge* motion be 
denied due to economic issue b cost to applicant. U/ 
affidavit of MA Duf f ie. r E lated Info & Certificate of Svc. 
TROWBR1DGE.O. F. Sham, Pittman, Potts, fc Trouibridge, 79/01/23. 
27pp. 

77020S0273 DOCKET SO-4O1 Shear on Harris Nuclear Pouter Plant. Unit S 
Notice of continuation on 79O2S7 of hearing rl mgt 
capabilities of app 1 1 cant. Hearings will be held in Raleigh, 
NC. 
SMITH, I. U. Atomic Safetg and Licensing Board Panel. 79/01/34. Spp. 

79020iOO&O DOCKET 5O-4O1 Shoaran Harris Nuclear Punier Plant, Unit 2 
Informs that const permit proceeding is pending except for 
mgt capability i saue. Forward s mo-mo from NRC goologiat re 
faulting at site. Several faults have been noted) none yet 
proven capable. 
QARTH.C. A. Office of the Eiecutive Leoal Director. 79/01/36. Ip. 

7902120190 DOCKET SQ-4O1 Shearon Harris Nuclear Power Plant. Unit a 
Responds to NRC 79122O 1 tr ta Hart re need for power from 
proposed li te. Bel ieves truth Is missing from administrative 
proceedings. Claims forecasts have been consistently too 
high. 
EDDLEMAN.W. Affiliation Unknown, 79/01/37. 3pp. 

7902030057 DOCKET 30-flOl Shearon Harris Nuclear Power Plant, Unit 2 
NRC opposition to intervenor EL ' motion to remand proceeding 
to rtBt,D for further evidentiary hearings on need for four 
nuclear power reac tor s. Recommend s motion be denied. 
Certificate of 3vc encl. 
DARTH.C.A. Office of the Eiecutive Legal Director. 79/01/29. 6pp. 

79022B0090 DOCKET 3O-4O1 Shearon Harris Nuclear Power Plant, Unit 2 
Forwards IE Info Notice 79-01, "Qergen-Paterson Hydraulic 
Shock & Sway Arre&tors (HS3A)," 

O'REILLY., J. P. Region 2, Atlanta, Office of the Director. 

79/03/02. Spp. 

79022Q0330 DOCKET 5O-101 Bhearc-n Harris Nuclear Pouier Plant. Unit 2 
Forwards IE Bulletin 79-Q1, "Environ Qualification of ClssB 
IE Equipment, " H/l 1st of 11 systematic evaluation program 
plants for uhith no action is required. 

0'REIU.Y, J. P, Region 2, Atlanta. Office of the Director. 

79/OS/OB. Spp. 

.7902300052 DOCKET SO-401 Sihearon Harris Nuclear Pouier Plant, Unit 2 
Forwards IE Info Notice 79-O3. "Limitorque Valve Oeared 
Limit Suiltch Lubricant. " 

P'REILLY, J.P. Region 2r Atlanta, Office of the Director. 

79/02/09. Spp. 

79020BOS27 DOCKET 50-102 Bhearori Harris Nuclear Power Plant. Unit 3 
Forwards ropt on micaceous gneiss layer 81 schistose lone 
requested by NRC during 7812O8 Insp of main dam coretrBnch. 
Concludes micaceous gneiss layer & schistose lone cannot be 
capable of faul ts. W/photo t four oversiie drawings. 
MCDUFFie.M. A. Carolina Pouier t. Light Co. 79/03/OH. IHpp. 

7902220066 DOCKET 50-103 Stinaron Harris Nuclear Power Plant, Unit 3 
Forwards leab repts as requested by Thompson ra random 
rockfill. 
MCDUFFIE. M. A. Carolina Power t< Light Co. 79/02/02. Ip. 

7902220072 DOCKET 50-103 Sliearon Harris Nuclear Power Plant, Unit 3 
"Large Scale Triaiial Shear !i Permeability Tests." Forwards 
results of 15- inch diameter consolidated undrnined triaiial 
shear teat, grain siie analyses tt 14 inch diameter constant 
head permeability tests. 
-tt Consumers Power Co. 7S/O4/30. 2Qpp. 

79022H0074 DOCKET 50-102 Ghearon Harris Nuclear Power Plant, Unit 3 
"Excavation, Backfill, Filling & Grading." Specifications far 
eicovation. f oundati on preparation ti backfill for plant area 
bldgs.all reservoir concrete structures b filling t, grading 
in plant area. 
* Consumers Power Co. 79/01/O2. l&pp. 



DOCKETED ITEMS 



115 



7V0333O079 DOCKET 90-405 Shearon Harris Nuclear Power Plant, Unit 3 
_ "Eaaaniaents, Dams, Dikes, d Channels, " Specification covers 
itrlppllng at base For embankments, eicavation aP cutoff 
trenchei> channeli, preparation of embankment foundation t> 
placement of embankment matl in Class 1 dams 
* Consumers Poiuer Co. 79/01 /OB, 24pp. 



7903120190 DOCKET 30-402 Shearon Harris Nucl*ar Pouer Plant. Unit 3 
Responds to NRC 7B1230 Itr to Hart re rie*d for power from 
proposed si te. Eel i eves truth is missing from administrative 
proceed ings. Claims forecasts have been con-i i stent 1 y too 
high. 
EDDLEMAN, H. Affiliation Unknown. 79/01/27. 3pp. 



7902830076 DOCKET 30-402 Shearon Harris Nuclear Power Plant, Unit 3 
"Random Backfill Matl Test Vfl-24-4-1, " Contains results of 
tut fill VR-24-4-1 which Includes large volume in-place 
density test b grain size distribution tests. 
* Cqnsumers Pomer Co. 7S/12/21. 97pp. 

790S22u077 DPCKET 90-402 Bhearon Harris Nuclear Power Plant. Unit 3 
"Random Rockflll Matl Tost VR-24-4-2. " Contains results of 
test fill Vfi-24-4-2 which includes 2 large volume in-place 
density tuts St grain liie distribution test*. 
. Carolina Power & Light Co. 7B/12/20. 40pp. 

7901190211 DOCKET 30-402 Shearon Harris Nuclear Power Plant, Unit 3 
Ack racalpt of NRC 790109 Itr re proceeding ti roaubmits 
App A, B S< C as requested. 
RE19.E.J, Office of tha Eecutivo Legal Director. 79/01/11. 16pp. 

7902050240 DOCKET 50-402 Bheeran Harris Nuclear Power Plant. Unit 3 
Response to 790102 request providing tables b individual 
plant luminaries from draft NUREO-0366 "Nuclear Power Plant 
Operating Experience for 1977. " 
EARTH. C, A. Office of the Eiecutlve Legal Director. 79/01/01. 21pp. 

7902230109 DOCKET 50-402 Bhearon Harrlf Nuclear Power Plant. Unit 3 
AMtnd to petition to intervene. Elaborates on W Eddleman ti 
Kudiu Alliance interest in proceeding b lists Issues 
previously raised. 
. EDDLEMAN,W. Affiliation Unknown. 79/01/04. 23pp. 

790M300Q7 DOCKET 30-403 Shearon Harris Nuclear Power Plant, Unit 3 
Forward! documents as requested in 7B1220 1 tr: UASH-1 130. 
revised US AECI1973) "Ubil Staffing b Training for Nuclear 
Poweri " Reg Guide l.Bi b NUREO 0094 "NRC Operator Licensing 
Quid*. " 
BARTH, C. A. Office of the Executive Legal Director. 79/01/05. 2pp. 

7902090233 DOCKET 90-402 Bhearon Harrli Nuclear Pouer Plant, Unit 3 
Motion by intervenors Conservation Council of NC b Make 
Envlrani Inc for Commission to remand to ABLE the Issue re 
need for proposed unit ulttiln time fram per const permits. 
Certificate of Bvc end. 
ERHIN. T, B, Erwln, T. B. 79/D1/OB, 9pp. 

7902010296 DOCKET 30-402 Bhe'aron Harris Nuclear Power Plant. Unit 3 
Submits petition on behalf of Kudiu Alliance for reopened or 
rvManded further hearings b petition to suspend const 
pending resolution of new evidence & updating new estimates. 
EDDLEMAN, W. Affiliation Unknown, 79/01/17. 7pp. 

7908090086 DOCKET 90-402 Bhearon Harris Nuclear Pouer Plant, Unit 3 
Apptalt ASLB 790110 order denying petitions to intervene ai 
general Intervenor In safi mgt capability hearings filed by 
Kudiu It W Eddleman. 
EDDLEMAN- W- Kud IU Al 1 lance. 7*7/01/17. 23pp. 

7902030014 DOCKET 30-402 Shearon Harris Nuclear Power Plant, Unit 3 
Applicant'* response to Conservation Council of NC t< Make 
Environ Inc motion to remand to ABLB for further hearings. 
Sees no tense In reopening need for power inue. W/photoi, 
affidavit, Certificate of Bvc b Capacity Plan. 
TROWBRIDCJE, 0. F. 8haw, Plttman. Potts, fc Troubrldg*. 79/01/23. 



7903040137 DOCKET SO-402 Shearon Harris Nuclnar Power Plant, Unit 3 
Applicant's response to Intervenors' 790103 motion to remand 
to A8LB for hearing! re need for power issue. Urges motion be 
dinted due to economic issue & cost to applicant, H/ 
affidavit of MA Duff ie, related info h Certificate of Bvc. 
TROWBRIDOE. 0. F, Bnau, Plttman, Potts, & Trowbridge. 79/01/23. 
H7pp. 



7902030027 DOCKET 30-403 Shearon Harris Nuclear Pniuer Plant, Unit 3 
NRC opposition to intervunnra ' motion to remand proceeding 
to ASLD for further evidentiary hearings on need for four 
nuclear power reactors. Recommends motion be denied. 
Curtificate of Bvc end, 
BARTH.C.A. Office of the E.ecutivu Legal Director. 79701/39. ipp 

79032B0090 DOCrtET 30-402 Shearon Harris Nuclear Pouier Plant. Unit 3 
Forwards IE Info Notice 79-01. "Bergen-Paterson Hydraulic 
Shock & Swag Arresters (HSSA). " 

D'HEILLY, J. P. Region 3. Atlanta, Office of the Director. 

79/03/02. 3pp. 

79022B0920 DOCKET 90-402 Shuaron Harris Nuclear Pouier Plant, Unit 3 
Forwards IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment." W/liat of 11 systematic evaluation program 
plants for which no action is required. 

O'REILLY, J. P. Region 3, Atlanta, Offica of the Director. 

79/OH/OB. 2pp. 

7902300053 DOCKET 30-403 Shea ran Harris Nuclear Pouter Plant. Unit 3 
Forwards IE Info Notice 79-03. "Llmitorque Valve Beared 
Limit Switch Lubricant. " 

O'HEILLY, J. P. Region 2. Atlanta, Office of the Director. 

79/03/09. 2pp. 

7902Q00B27 DOCKET 30-403 Shearon Harris Nuclear Pauer Plant, Unit 4 
Forwards rept on micaceous gneiss layer & tchistose IOTIB 
requested by NRC during 781303 insp of main dam core trench. 
Concludes micaceous gneiss layer b schlstoiB lane cannot be 
capable of faults. W/photo & four ovBrslie drawings. 
MCDUFFIE, M. A. Carolina Power & Light Co. 79/03/O2. 13pp. 

7902320066 DOCKET 30-403 Shearon Harris Nuclear Power Plant, Unit 4 

Forwards test repts as requested by Thompson re random 
rockfill, 

HCDUFFIE, ri, A. Carolina Power I, Light Co. 79/02/O2. Ip. 

7902820072 DOCKET 30-403 Shaaron Harris Nuclear Power Plant. Unit 4 
"Large Scale Triaiial Shear k Permsabili ty Testa. " Forward B 
results of 13 inch diameter consolidated un drained trisiial 
shear test. grain slie analyses & 14 inch diameter constant 
head permeability testa. 
Consumers Power CD. 7S/Ofl/30. 213pp. 

7903220074 DOCKET 80-403 Shearon Harris Nuclear Power Plant. Unit 4 
"Etcavatlon, Backfill. Fill ing b Grading. " Specifications for 
excavation, foundation preparation & backfill for pl-ant area 
bldgsiall reservoir concrete structures i filling t grading 
in plant area. 
Consumer* Pouer Co. 79/01/03. I6pp, 

7903220073 DOCKET 50-403 ShHaron Harris Nuclear Power Plant, Unit 4 
"Embankments, Dams, Dikes, h Channels." Specification covers 
strlppling of base for embankments, excavation of cutoff 
trenches, channel s, preparation at embankment foundation l< 
placement of embankment matl in Class 1 dams. 

* Consumers Pouer Co, 79/01/08. 24pp, 

7902220076 DOCKET 30-403 Bhearon Harris Nuclear Pc-uer Plant, Unit 4 
"Random RorVfill Matl Teat VR-2-J-4-1. " Contains results of 
test fill VR-24-4-1 which inctuilBs large volume in-place 
density test b grain size distribution tests. 

* Consumers Pouer Co. 78/12/21. 37pp. 

790222 V 077 DOCKET 30-403 Shcaron Harris Nuelear Power Plant, Unit 4 
"Random Flockfill Matl Test VR-24-4-2." Contain* results nf 
test fill VH-24-4-2 which includes 2 large volume in-place 
density tests b grain slie distribution testa. 

* Carolina Pouer t, tight Co, 78/12/20, 40pp. 



770209027S DOCKET 90-402 Shearon Harris Nuclear Pnuer Plant, Unit 3 
Notice of continuation on 790227 of hearing re mgt 
capabilities of applicant. Hearings mill be h*td in Raleigh, 
NC. 
SMITH, I. M. Atomic Bafetu and Llcaniing Board Panel. 79/01/24. 2pp. 



7902030240 DOCKET 30-403 Shearon Harris Nuclear Pouier Plant. Unit 4 
Response to 790102 request providing tables !- individual 
plant summaries from draft NUREO-036i> "Nuclear Pauier Plant 
Operating Experience for 1977." 
DARTH.C.A. Office of the Eiecutive Legal Director. 79/01/04. 21p 



7902Q&0060 DOCKET 50-402 Bhearon Harris Nuclear Power Plant, Unit 3 
Informs that const permit proceeding is pending incept for 
igt capability lisue. Forwards memo from NRC fluologUt rt 
faulting' at tltt. Several faults have been notedi none yet 
provtn caiablt. 
IARTH, C. A. Office of the Executive Lagal Director. 79/01/56, Ip. 



7908230103 DOCKET 90-403 Bhearon Harris Nuclear Pouie-r Plant. 
Amand to petition to intervene. Elaborates on W Etfdleman & 
Kudiu Alliance interest in proceeding & Hits issues 
previously raised. 
EDDUEHANiH. Affiliation UnVnoun. 79/01 /O4. 25pp.. 



116 



DOCKETED ITEMS 



7902020007 DOCKET 50-403 Shearon Harris Nuclear Power Plant. Unit 4 
Forward* documents as requested in 7B122O I tr: WflSH-1130, 
rcviicd U5 AECU973) -Util Staffing I, Training for Nuclear 
"~"tT, m Reg Guide I, B, L NUF1EG-O094 "NRC Operator Licensing 



Guide 
BARTH, C A. 



Office 



ctor. 79/01/05. 2pp. 



79020902B3 DOCKET 50-4O3 Shtaror. Harris Nuclear Pouer Plant, Unit 4 
Motion by inlervenora Conservation Council of NC fc Hate 
Environ. Inc for Commission to remand to ASLB the issue re 
nee* far proposed unit within time frame 
Certificate of Svc end 
ERH1N.T.S. Eruin, T. S. 79/01/OB 5pp. 



per const permits. 



79020500B8 DOCKET 30-4O3 Shearon Harris Nuclear Pouer Plant. Unit 4 
Aapeali ASLB 79011O order denying petitions to intervene as 
general intervenor in safe mgt capability hearings filed bu 
Kudiu t, u Eddlman. 
EDDLEMAN, H Kudiu Alliance. 79/01/17. 33pp. 

7702030014 DOCKET 50-403 Shearon Harris Nuclear Power Plant. Unit 4 
Applicant's response to Conservation Council of NC t Make 



Environ. Inc 






notion to reaand to ASLB for further hearings. 
rE P en ' n S need for power i ssue. U/photos, 
capacity plan 
PDtts ' B Abridge. 79/Q1/33. 



ertlficate of Svc t 



79030MI37 DOCKET 50-4O3 Shearon Harris Nuclear Poer Plant, Unit 4 
fflS"* * r " fan " to 'nt"venors' 7901OB .Dtion to remand 
SLB for hearings re need for power issue. Urges aotion be 
e """O"" is sue t cost to applicant. H/ 

2* ""*" "l.lifl info 6 Certificate of Svc. 
.F. Shaw. Pittman. Pott,, t, Trowbrirfge. 79/01/23. 



r^ih!i?! i CDnt i'"' a 'i 0n n " 337 af "'"ins gt 

tap. biltti.s of appj.canl. Hearings will t, held in Raleigh. 

SmiH.l.H. Atomic Safety and Licensing Board Panel. 79/01/21. 



79023S0052 DOCKET 50-403 Shearon Harris Nuclear Power Plant. Unit 4 
Forwards IE Info Notice 79-03. "Limitorque Valve Geared 
Limit Switch Lubricant." 

O'REILLY, J.P. Region 2, Atlanta. Office of the Director 

79/03/09. 2pp. 

7903120210 DOCKET SO-401 North Anna Powor Station. Unit 3 
Ack receipt of 7B1121 Itr. Requests clarifications rs 
implementation of Category 1 reg guides. Expresses 
uncertainty re final design description For operating 
license application. 
BROWN.B.C. Virginia Electric t. Power Co. 79/02/06, 2pp. 

7903030213 DOCKET 50-4O1 North Anna Pauer Station, Unit 3 
Endorsement 39 to Policy MF-57. u/chanoe in llahllltii for 
VA Electric t, Power Co. 
QERAS.T. Nuclear Energy Liability Insurance A.sociation. 70/12/14, 

7902000306 DOCKET 5Q-404 North Anna Power Station, Unit 3 
Endorsement 51 to form part of NELIA Policy NF-1H6, , w/amendl 

.t: n ?i"w 2i"t!:;f ""P^^O" propBrty aaa "" in -" n 

79^^: R ' 1P NUC1B " & "" Liabllit '~' Ai.ii. n . 

790220003S DOCKET 50-404 North Anna Pouer Station. Unit 3 
Endorsement for calendar year 1979 for NELIA Policu NF-106 
Virginia Electric Si Power Co. 79/01/20. lp. 

7902=60461 DOCKET 30-404 North Anna Po* B r Station, Unit 3 
Endorsement 23 to NELIA Policy NF-240 for calendar year 

Nuclear Energy Liability Insurance Assoiiation. 79/01/2O. lp. 



3pp. 



59/03/02.' J ' 5pp. 



North *"" 



Atlanta ' 



Station. Unit 3 



the Director. 



t 

t P r """"n9 is pending e.cept for 

uarl ' 9 " mo troa WC seologist re 

fauit ..... b " n -"*-2- 



BAHTH.C.A. Office of the E.ecutiv* Legal Director. 79/01/36. lp. 
7902130190 DOCKET SO-4O3 Shearon HarrU Nuclear Pow.r Plant Unit 4 

"* B|22 itr i s Hart " ". "** 



9/02/08 2pp. 



high 



ve been consistently too 



EDW-EHAN.H. Affiliation Unknon. 79/01/27. 3pp. 



79/03/09.' 



BR 0N, 9 .C. 



Virgina Electr Power C . WOB/IB . 



ip . 



BAflTH.C.A. Office of the E.ecutive Legal Direct 



or. 79/01/37. 



"",:s^ n a S:^s;": r -KSr; 1 ;,^ lw Pow - piant - un 






Shod t, Sa Arrtrt (HSSA) BBr " n - pater " 1 ' Hy-raulic 
79/02/03": " S P p Re! " nn S> MI " ntf " Offl " -' *"e Director. 



Mcation of Class 

1 -" "- . 

of th. Director. 



79/02/oa = pp , 



BROWN, a C. Virginia Electric t, Power Co. 



79/02/06. 2pp. 



VA El ec trl E 



JERAS.T. Nuclear Energy Liability Insurance A..ociati n. 



7B/1B/14. 



i 

= f Condition 4 re bodil in ,uru "^l" ^"^A. w/a.end 

.t. for VA Electr?c""power Co prB "- r * 'nsur.nc, 

NUlear El " r!ly ""* insurant Association. 






TSSSTffi 



DOCKETED ITEMS 



117 



7902260461 DOCKET 5Q-405 North Anna Power Station, Unit 4 
Endorieaent 22 to NELIA Policy NF-240 for calendar ear 
1979. 
Nuclear Energy Liability Insurance Association- 79/01/2O. lp. 

79OSB3O139 DOCKET 3O-403 North Anna Power Station, Unit 4 
Forward i IE Info Notice 79-01, "Bergen-Paterson Hydraulic 
Bhack tc Sway Arrestors (H8SA). " 

O'REILLY, J. P. Region z > Atlanta. Office of the Director 

79/02/OB. 5pp. 

79022HOB29 DOCKET 50-4O5 North Anna Power Station, Unit 4 
Forwards IE Bulletin 79-O1, "Environ Qualification of Class 
IE Ee.uip*ient. " W/list of II systematic evaluation .program 
plant* for uhich no action is required. 

O'REILLY, J. P. Region 2, Atlanta, Office of the Director. 

79/02/OS. 2pp. 

79022HO163 DOCKET 50-4O5 Mo-rth Anna Power Station, Unit 4 
Forwards IE Info notice 79-03, "Limitorque Valve Geared 
Limit Snitch Lubricant." 

O'REILLY, J. P. Region a, Atlanta, Office at the Director. 

79/03/09. 2pp. 

7902270374 DOCKET 3O-4Q3 North Anna Power Station, Unit 4 
Forwards "Rock Anchor Teit Program Kept" re verification & 
evaluation of design parameters. 
BROWN, 8. C. Virginia Electric ti Power Co. 79/O2/1S. lp. 

7702220119 DOCKET 3O-409 La Cross* Boiling Water Reactor 

Inform that TRAWK PampMet 350-30, "Interservi ci Procedures 
for Instructional Bys Development" referenced in NUREC-0219 
it available in *>icrofich.e form Prom NRC. 
HESAH.W.J. Division of Document Control. 79/01/09. 2pp. 

790233OO94 DOCKET 50-4O9 La Crosse Dolling Water Reactor 
Requests addl Info for review of 7H101B respond to NRC 
fire protection guidelines on administrative controls, 
functional responsibilities t QA. Forwards NRC position on 
pacific concerns re Fire protection review. 
ZIEHAWN. D. L. Operating Reactors Branch a. 79/01/30. 7pp. 

7902O9O291 DOCKET SO- 409 La Crosse Boiling Water Reactor 
Forwards aedl info on fire protection review re snqke 
detection sys, exterior hose houses, fire pump performance t, 
fir* toor assemblies. 
LINDER.F. Dairyland Power Cooperative. 79/O1/31. 9pp. 



7902O1Q33D DOCKET SO-4O9 La Crosse Boiling Mater Reactor 

Notification of 7902O9 meeting /util to discuss elements of 
a soil properties investigation program to tie performed 
under systematic evaluation program Topic 11-4. 
HETMOREi J. S.' Operating Reactors Branch 2. 79/O1/24, lp 

7902O501B4 DOCKET 5Q-4O? La Croase Hoiling Water Reactor 
Forwards revised table & verified data ro Safety Topic 
V-ll. A. . "Isolation of Lou Pressure Sys from Re-actor Coolant 
Sys. " 
LINDER.F Dairyland POUIDJ- Cooperative. 7v/Ol/2. 3pp. 

7903Q90313 DOCKET 5O-4O9 La Cross? Boiling Water Reactor 

Forwards addl info requested in NRC 79!S3'7 Itr For review of 

proposed mod to spent fuel storage pool. 

LIKDER, F. Dairyland Power Cooperative. 79/O1/31- 3pP 

79O2140219 DOCKET -5O-4O9 La Crosse Boiling Water Reactor 
In response to NRC 7BI 139 1 tr. provides inFo tn justify 
continued unlimited containment ventilation (purging 1 in 
actordance la/Op t i on 3 of 1 tr. Draiulngs cnc 1 
LINDER.F. Dalrtjland i-quior Cooperative. 79/O2/01.. 13pp. 

7903260435 DOCKET 50-409 La Crossu D-oiling Hater Reactor 
Reports resu-lts OF B^mpliiig & analysis actions (J addl 
operational info For Four periods when reactor thermal power 
changed by more than 1 5X of rated thermal power within one 
hour While In Operational Condition 1 or 3. 
LINDEfi.F. Dairy land Power. Coopcrat 1 ve. 79/O2/14. IHpp. 

7909ao0446 DOCKET 5O--1O9 Lj Crosse Dolling Water Reactor 

Forwards addl info re sels-mic analyiis of spent fuel storage 

pool drain line submitted 7O1229. Rosponila to 7OIB1Q telcon 

request, 

L.INDER.F. Dalrijland Pour Cuuperat i ve. 79/O3/14. 10pp. 

7903010030 DOCKET 50-407 La Crnsae Dolling Hoter Reactor 
Forwards Inap Rapt 5O 3O9/7Q-15 on 7B1 1 19-22. Not i Co of 
violation withheld (ref 1OCFR2. 7901. 
HIND, J. A. Region 3, Chicago, Safeguards Branch. 79/O1/1?. 2pp. 

79O201003A DOCKET 50-fl09 La Crosse Boiling Water Reactor 

IE Insp Rapt 50-40?/7e-l 5 on 7B1 1 19-22. None omp 1 lance noteB: 
acc**s controls ti security organ! rat ion. Detal 1^ utthheld 
(ref 10CFH3 7901. 

MADEOA, T. J. , CHRIBTOFFER, O. H. HlMDr.1. A. Region 3, Chicngo. 

Oafeguards Branch. 79/Q1/IO. lp. 



7902870282 DOCKET SQ-409 La Crosse Boiling Water Reactor 
Bubal ti changes to modified amended security plan. Changen 
withheld (ref 10CFRB. 790>. 
TAYLOR, J. H. Dsirgland Power Cooperative. 79/O2/21. 2pp. 

7902O3O2S2 DOCKET 50-40"? La Cross* Boiling Hater Reactor 
Forwards BAND77-1 927, "Transport of Radionucl Idas in Urban 
Environs: Working Draft Assessment" t> two inPo repts 
(8ECY-73-3U !< SECY-7H-31 1A). uhich indicate NHC view of 
rept findings on regulatory pollcu. W/o encl. 

UOODHEAD.L.P. Office oF the Executive Legal Director. 79/O1/OB, 
2pp. 



790B120132 DOCKET SO-409 La Crosso Hailing Water Reactor 
Forwards IE Info Notice 79-01. "DergEn-Patert.on Hydraulic 
Shock >A Sujaij Arrestors (H5SA). " 

KEPPLEH.J.O. Iteoian 3, Chicago. Office of the Director. 7v/O2/a. 

lp. 

7902310302 DOCKET 5O-4Q7 La Crosse Balling Water Reactor 

Forwards IE Dullotin 79-01 i "Environ Oual if icatiun oF Class 

IE Equipment." U/lint of 11 systematic evaluation prooTam 

plants for which no action IB required. 

KEPPLER.J. 0. Region 3, Chicaoo. DFFice of the Director. 79/02/07. 



7901220263 DOCKET 90-409 La CroBee Boilino Hater Reactor 
Forwards BECV-73-311 It BECV-7S-311A u/"Corrocti on Notice. " 
Both documents uiere inadvertentlu omitted from 79010B Itr. 
UOODHEADiC. P. Office of the Executive Legal Director. 79/OI/12. 
lp. 



7903270346 DOCKET 5O-1O9 Lfl Crosse Dolling Mator Reoctor 
Forwards IE Info Notice 79-03^ "Limttnrquo Valve Ooared 
Limit Switch Lubricant. " 

KEPPLERiJ.O. Region 3. Chicago, Office of the Director, 

lp. 



79020SO214 DOCKET SO-409 L* Create Dolling Water Reactor 
Forwards Endorsement 30 to NELIA Policy NF-317. 
DEVINE.H.F. Dairyland Power Cooperative. 79/O1/29. 3pp. 



7902130064 DOCKET SO-109 La Onsae Dolling Water Reactor 
Forwards monthly operating rept for Jan 1979. 
UNDER. F. Dairijland Power Cooperative. 79/O2/OQ. lp. 



7902O1O127 DOCKET 9O-409 La Cros Boiling Water Reactor 
Forwards LAC-TR-O66, "Reactor Containment Dldg Integrated 
Leak Rate Test For the La Crosse Boiling Water Reactor," 
dtd Dec I97B. First presEUriiatlon containment hldg leakage 
rate for 1978 ua& O. 1033K/24-h. 
LINDER.F. Dairyland Power Cooperative. 79/01/17. if. 

79O2O1013S DOCKET 30-409 La Crosae Boiling Water Reactor 
"Rtactor Containment Bldg Integrated Leak Rate Test 
for the La Crosse Dolling Water Reactor> " performed in 
Get li Nov 197S. Includes data analysis & instrument error 
ana lysis. 
Dairyland Power Cooperative. LAC-TR-066. 7O/12/31. 



Slpp. 



790EOHOQ36 DOCKET 5O-409 La Crosse Boiling Mater Reactor 

Sumxary of 7901O9 meting re liquefaction potential at site. 
Liquefaction analysis prepared by US Army Engineer Waterways 
Elpe/TiMent Station encl. 
HETHORE, J. 9 Operating Reactors Branch 2. 79/01/20. 42pp. 



7902iaOOe,S DOCKET 50-409 La CTOSHB Boiling Mater Reactor 
Monthly ojHrating rept for Jan 1979. 
PAPHDRTH. L. 0, Dairyland Pouer Cooperative 79/O3/Q&. 



79020A0299 DOCKET 5O-407 La Crossa Dfliting Water Reactor 
Forwards LCR 77-OO2/O1T-O, 
LINDER.F. Da Ireland Power Cooperative. 79/D1/S9. 6pp. 

7903060H99 DOCKET 50-409 La Crosae Ooiling Hater Reactor 
LER 79-OO2/01T-0 un 79O1 1 5: p erlod ic leakage rate testing 
revealed e-lectrical ponatration units 3,4 & 6 did not meet 
Type C teat criteria. Imbrittl edient of epoxy sealant 
contributed to leaks.. Repaired w/reapp 1 1 cat i on of epoxy. 
BABHORTH. -J- C. Dairyland Pouer Cooperative. 79/01/29. lp. 

79Q2Gt024ii DOCKET SO-4O9 La Croisa Doiling Meter Reactor 
Forward* LERs 79-OO3/01T-O S. 79-O04/01T-O. 
LIKDER, F, Dairijland Pouer Cooperative. 79/O2/01. 3pp. 



11B 



DOCKETED ITEMS 



7902040350 DOCKET SO-409 La Cro a ,e Boiling Water Reactor 

LEH 7*-003/01T-0 an 790118: indicated | D akage rate for seal 
injection ngs makeup vslvs uaa 0. 4Q4 atd cubic ft/h Cause 
unknown. Valve repaired , now complies in/Type C teat criteria 
PAPWCRTH, L. O. Dairyland Poucr Cooperative. 79/O3/OI lp' 



7902130014 DOCKET 50-412 Beaver Valley Power Station, Unit 2 
FnruBrds IE Infc Notice 77-01 , "Ber D n-Pater.on Hgdrau 1 ic 
Shock & Suiaij Arre-stors IHBSA), 

1 RE9 ""' - 1 ' J>fliladEl P rtia ' 0' f the Director, 



3'-4Q9 La Crosse Boiling Water Reactor 
T-0 on 790119: indicated leak rate for 
dentneTaliied water isolation valve uas 0.597 std cubic 
ft/h. Caused bv normal surfac* uear. Valve repaired & noui. 
compiles u/Type C test criteria. 
PAPUDRTHiL. 0. Dalrijland Foyer Coop Erati ve, 79/02/01. lp. 

79 Fc!r^r" ?!!^[.??"* 10 M "" MUB P ' nt Nuele '"- Station, Unit B 



79MOBMTO DOCKET SO-410 Nine Mile Point NucX.r Station, Unit a 
Notification of 770233-14 matins u / Mar , il OUn .n group to 

IN^ r 1 ** "'**""* Vfllv * p001 " namlc loa ' s - 

ANDERSON, C.O. Containment By 5 terns Branch. 79/01/S4. 3pp. 



; 410 Nlna " lle po *"t ! Station, Unit S 
CMtr r^' I- Pt ^W-MOlO-a-Buppl 2, "H asBB , OT 

Criteria for Combination oS Earthquale Sr Other Transient 
Responses by the Snuare-naot-Sum-Clf-The-Bquarns Metlmd " 
=^L ,* P. PQVll]elf on b-halF of Mart 2 owner's B roup. 



79022ao4Qfa DOCKET 50-412 Beaver ValUg Pnuer Station, Unit 2 
Forwards IE Bulletin 79H31, "Environ Oual ification of Clan 
IE Equipment." hi/ list ap 11 BijBtomatic evaluation pro D ram 
plants FOP which no action li required. 

OHIER.B.H. Realtfn 1. Philadelphia, Office of the Diractor 

79/OS/OB. IP, 

790SS-30041 DOCKET 30-413 Catauha Nuclear Station, Unit 1 

Informs that TRADOC Pamp-hlflt 350-3O. "Interservieo Proceduru 
for Instructional Bifs &BVB 1 opraant" referoncBd in NUREG-O3I9 
1 available in microfiche form from NRC, 
BEBAW.W.J. Dlvisinn c-f Document Control 70/11/20. 3pp, 

7908380235 DOCKET 50-413 Cataiuba Nuclear Station, Unit t 
Forwards IE Info Notice 79-Q1, "Berg en-Patei-son HutfrauUc 
Bhocli E. Sviatj rtrrPEtora {HSBA^, " 

O'REILLY, J. P. Region 2, Atlanta. Office of the Dlroctor. 

79/03/02. Bpp. 

79022aOOB9 DOCKET 3O-413 Catauba Nuclear Station, Unit 1 
Forward s IE Info Notice 79-O3, "Limi torftue Valve OeBrsd 
Limit Switch Lubricant." 

lP - Reaior. S, Atlanta, Office of the Dlr.ctor. 

app , 



c"? t0 NinE hllC Polnt Hucl " Bt.tlBn, Unit 2 
H fqr Criteria *or Combination of Earthquake L 

mn S,. n ?. rmt " By the S qu8 r e -Ro n t-S Um -c.f-the- 
Method. " Di, tua5flS method *or combining multiple 

"- 16 r " sp0n5 " * Dr "* lfc " * "rthauaV.s. P 



cn I ?/ ino 11E P"'nt clear Station, Unit 

Asts CommUiJon to halt rad<ja B te incinerator project bu 
^ithdr^lng M.agara-Mohayk Po^r Corp ce a t p e rit until 
public concerns ar& eatisfied 
HERMANS. R. Affiliation Unknown. 79/01/32. lp, 



. 

p rti H p"*^' i" Deth "^'HD^/repr ea entatJv, 

of utils u/post-CP applications to discuss pending Oi. 
rtylwj matUr,, including staff polices !, rBVltM p rioritv 

019 " ~ " 



. 
Light Water ReBCtor. Dranch 3. 79/OI/1S. Bpp. 

77020iOa6fi DOCKET 50-410 Nine Mile Point Nuclear Station, Unit 2 
HesT 1 " 7? " 3 ' " FaiIU '" ! f ' Volt Vltal * C 

" 61 " " '' phil -"- J l"' i - "i" f fe Dlr.ctor. 



7902130037 DOCKET 90-qio Nine Mile J= int Nuclear Static!,, Unit H 

^71^^ ln * ot *"<* W-01.D.ri.n-P.t.P,o n Hydraul c 
Shod !< Suia-j ftrrcstors (HSSA) " 

7?/02/03 H ' 1 P FtB - i " 3 ' PnilatfB " J ' 1 ^' Office of tile Director. 



_ 410 w(ne . ,, ^ Btatlor . Unlt 

Foruard, IE Bull.tln- 79-O1. "Environ Qual i f Ication oF il" 

1,^ K! nt i K /ntt ? f U a ^ te ^t'= ^luation orogpao, 
plants for ufiich no action is required 

79 "arts" 1 IP Rea ' OT1 l ' Philflriel " hifl ' Offi " -f the Director. 



7902230061 SOCKET 5O-114 Catauba Nuclear Station, Unit Z 

Informs tJiat TRADOC Pamphlet 330-30, "lnt>r B ervUe Procedurn 
for Instructional Sgs Development" rsforenced in KUBEO-OB19 
is available in microfiche' form from NRC. 
BESAW. H, J. Division of Document Control, 7B/11/20. 3pp. 



77032B0335 DOCKET 3O-414 Catauba Nuclaar Station, Unit B 
Forwards IE Info Notice 79-O1, "Berg tn-Patsrmon Hudraulic 
3noc* & Syay ArreatnrH (HBBA). " 

l S' "eflion 3, Atlanta, Office of th Director. 



790-22B0099 DOCKET 50-414 Catayba Nucl.ar Station, Unit 2 
Forujards IE InFo Notice 79-03, "Liml torque Valve Oeartd 
Limit Buitch Lubricant," 

79/02/09' J ' 2' ft 9 ion 2 ' Atlanta, Office of the Director. 

7902030D2S DOCKET 3O-4J5 Draill Nuclear Plant 

Requests amsnd to Export License XR-B1 to incorporati 
equipment- tools, tomponant* K, matli diipoeal or tranifer to 
another facility. 
BAKINj T. R. Westlnffhouae Electric Corp. 79/01/19. lp. 

7902020313 DOCKET 50-416 Grand Oulf Nucl.ar Station, Unit 1 
Summary of 790109 meet ing Qn eafetg revieu schedule 
Susfe.tlons to fatilitate revi eu,: approach llc.n.ins, schaduU 
u/iame dlnclplitie a const ichedule racovsry planj.nturo all 
itn> ape addresEed In FSAJl, 
THOMAa.C. D. Light Mater Rea,ctorB Broiich 1. 79/01/33. 5pp. 

79032fl0025 DDCK.ET 80-416 Orand Gulf Nueliar Station, Unit 1 
Notice of sita visit for routine observation oflgiDlonie 
aBpecti of circulating uater pumphouse excavation k 
7902.n' lD9 " : aspect9 * *'** Rch(JulBd from 7901SS-26 to 
rHOHA9,C.O. Light Hater Reactor. Branch 1. 79/01/34. Spf. 



D OC ET so _ 4la DeJlvet . v-11 Poluer Btatjon , Unlt 3 
"5r* ? * ^vlsic-n* to aro enrf H d P h MB i t al Eecu ritg plan 
For WRC reviEU, & comment. RevisJ ons included introduction, 

!^.^f n >>JliVB E ,or S ani.atioi 1 rEfltri^ctur ing. * ro ploij e 

screening progrflrn changia. W/o enc 1 

HARQUARDT.W. H. DuquBsne Light Co. 79/01/26. Jp, 

790304020B QncKET 50-41B Q Bavt r va 1 1 By Pouar Station, Unit a 
Forwards draft revisions to amended physical security Ian 
Plan withheld (ref 10CF-R3, 790), y * 

trARQUARDT, H. W. DuquEstiE Light Co. 79/02/OB. 3pp. 

7902010336 DOCKET S0~4!3 Beaver V.ll. v P OWfl r Station, Unit 2 

- " 



of the Director. 



790SOB009B DOCKET SO-414 Orand Oulf Nuct.ar atatldn, Unit 1 
ForuardB first round requests- for *ddl info ai A reult of 
FSAR - BB t U8Bts util a """i"f PBAR to rnflect niponi 



STOLZ.O.F. 



LiflJit Water Reactors Branch 1. 79/01/E9. 33pp. 



7903310087 DOCKET 50-41* Brand Sulif Nuclear Station, Unit 1 
RDsponrit to NRC 781109 requaat. Forward! Itnic inf Uction 
profile data, specif JLcallg telvmlc lint ILDBchtnl Corp, 

BhBad Court ' AR ' E " cl " l <""*" proprietary 



BTAMPLEY.N. L. rlississippi Pouar & Light CD. 79/02/06. lp 

I 

790B210004 DOCKET 50-41& Grand Oulf Nuclear Station, Unit 1 
Forwards FIr*t round requests for addl info a* Jesuit of 
ralui of FSAR. Requests util Amend FSAR to reflect 
responses ay 79O5-04. j 

STDL2.J, F. Liaht Matr Reactors Branch 1. 79/08/OS. S4pp. 



DOCKETED ITEMS 



119 



7708120199 DOCKET 50-416 Grand Qulf Nuclear Station. Unit 1 
Forward* affidavit of svc on distribution of Amend 27 per 
HflC 7B0627 Itr. 
MCOAU8HY, J. P. Mississippi Power & Light Co. 79/02/06. 2pp. 



7908010060 DOCKET 50-114 Grand Oulf Nuclear Station, Unit 1 
Forwards application for Amaru! 27 to application for 
licenses. 
STAMPLEY. N. L. Mississippi Power (-Light Co. 79/01/31. 2pp. 

79Q20100A4 DOCKET 5O-416 Grand Oulf Nuclear Station, Unit 1 
Application for Amend 27 to application for licenses. Amend 
! In form of answers, to question! ft FSAR, per NRC 760627 
Itr. 
BTAMPLEY.N. L. Mississippi Power 5. Light Co. 79/01/39. ip. 

7902010069 DOCKET 90-416 Grand Oulf Nuclear Station, Unit 1 
Application for Amend 37 to FSAR. Discusset safety 
feature*, containment ays, ECCS, habitability *ys, fission 
product removal it control iyi li Inservice imp of Class 3 & 
3 components. H/encl ovtrtiied draulnja. 
* Mississippi Power i Light Co. 79/01/31. 160pp. 

7902000132 DOCKET 50-416 Grand Oulf Hue IMP Station- Unit 1 
Forward* IE Imp Repts 50-416/78-22 & 30-417/7B-22 on 
791213-19. No noncomplianee noted. 

MURPHY i C. E. Region 2, Atlanta- Reactor Conitruction tt Engineering 

Support Branch. 78/18/28. Spp. 

7703080130 DOCKET 30-41 i Qrand Oulf Nuclear Station, Unit 1 
IE Imp Rtpt 509-416/7B-22 (< 30-417/7B-2E on 7B1313-1B. No 
noncomp 1 iance noted. Major area* inpected:QA Implementing 
procedure*, protection of installed electrical equipment, 
fire suppression equipment h quality recordi. 

RUFF.A.B.. BRYANT, J.C. Region 2. Atlanta, Raetor Construction 

It Engineering Support Branch. 7B/12/27. 4pp. 



790202031B DOCKET BO-417 Orand Qulf Nuclear Station, Unit 3 
Summary of 790107 meeting on safety review schedule. 
Suggestions to facilitate revi ew: approach licensing schedule 
w/same discipline as const schedule recovery plani onoure all 
Items ara addressed In F8AR. 
THOMAS, C.O. Light Hater Reactors Branch 1, 77/01/23. 5pp. 

7902200025 DOCKET 30-417 Orand Qulf Nuclear Station. Unit 3 
Notice of site visit For routine observation of geologic 
aspect! of circulating water pumphouse eicavation & 
hydrologic aspects of site. Rescheduled from 790123-26 to 
790201-02. 
THOMAS.C.O. Light Water Reactors Branch 1. 79/O1/24. 2pp. 

79020B0093 DOCKET 50-417 Orand Qulf Nuclear Station, Unit 2 
Forwards first round requests for add! infn as a result nf 
review of F8AI1. Requests util amand FSAR to reflect responses 
by 790S04. 
STOLZ,J.F. Light Water Reactors Branch I. 79/O1/29. 33pp. 

79022100B7 DOCKET 30-417 Orand Oulf Nuclear Station, Unit 3 
Responds to NRC 7B1107 request. Forwards seismic reflection 
profile data, specif Ically seismic line HiBachtel Corp, 
Monette Area, Craghaad County, AR. Enc losed data propr 1-etaV-y 
(ref 10CFR2. 770). 
BTAMPLEViN. L. Mississippi Power <t Light Cu. 79/02/O6. Ip. 

7708810004 DOCKET 30-417 Grand Oulf Nuclear Station, Unit 3 
Forwards fint round request* for addl Info as result of 
mview of FSAR. Requests utll amend FHAR to reflect 
responses by 790304. 
STOLZ.J.F. Light Water Reactors Branch I, 79/OE/OB, 34pp. 

7708120199 DOCKET .30-417 Orand Oulf Nuclear Station, Unit 2 
Forwards affidavit of svc on distribution of Amend 27 per 
NRC 780627 Itr. 
MCOAUOHV, J, P. MlfHitslppl Power b Light Co. 79/02/06. 2pp. 



7903360136 DOCKET 50-416 Orand Oulf Nuclear Station, Unit 1 
Forward! IE Imp Repti 30-416/7^-21 Sr 50-417/7B-21 on 
7B1213-15. No noncompltanee, noted. 

MURPHY, C. E. Region 2. Atlanta, Reactor Construction fr Engineering 

Support Branch. 79/01/03. Hpp. 



7902010060 DOCKET 50-417 Orand Oulf Nuclear Station, Unit 3 
Forward i application for Amend 27 to application for 
11 con to*. 
STAMPLEV.N. L. Miflilppl Power tt Light Co, 79/01/31. 2pp. 



7902200141 DOCKET 30-416 Orand Oulf Nuclear Station, Unit 1 
IE Inp Ripti 50-416/76-31 I. 90-417/7S-21 on 701213-13. Ho 
nonconp 1 ianct noted. Major aria* Impeded; QA program 
ImpleMintatlon, melding actlvitleSi NRC reporting, ca duel ding 
obiarvatlon ti intp of const activities. 

RAUSCH.J.K.. OOUOE. M, J, , HERDT.A.R. Regions. Atlanta, I 

Construction & Engineering Support Branch. 79/01/03. 9pp. 



DOCKET 50-416 Orand Oulf Nuclear Station, Unit 1 
Forwardi IE Imp Reptt 50-414/78-33 fc BO-417/7B-23 on 
781237-29, No noncanpllance noted. 

MUBPHY, C. E, .'Region B, Atlanta, Reactor Conitruction h Engineering 
Support Branch. 79/01/12. 2pp, 

79038S044Q DOCKET 90-416 Orand Oulf Nuclear Station, Unit 1 
IE Inp Repls BO-41i/7B-83 I. 50-417/7B-23 on 781827-89. No 
nonconpllance noted. Major area* Inipectedireactor coolant 
rttur boundaru pip* welding actlvltlei b recordi. & 
lafetij-ralated pipe welding activities, 

CRDULEVi D. R. , CONLDN, T. E. Regions, Atlanta. Reactor 

Comtruction &. Engineering Support Branch. 79/01/18. 7pp. 



7902030058 DOCKET 30-416 Orand Oulf Nuclear Station, Unit I 
Act receipt o* IE In*p Rapt 50-416/7B-BO 8. 80-417/7B-20, 
on 781laa-1201.No proprltr info. 
HCO^UOHY, J.P. Mii*l*ttpoi Pouir t< Light Co. 79/01/15. Ip. 

790221010B DOCKET 30-416 Brand Oulf Nuclear Station, Unit 1 
Act receipt of IE Imp R*pt* 90-416/7S-22 fc BO-417/7B-23 on 
701213-15. No proprietary, info. 
MbflAUOHVi J. P. Mi*Uippi Power t. Light Co. 79/01/24. Ip. 



79032BOS34 DOCKET 50-416 Orand Oulf Nuclear Station, Unit 1 
Forwards IE Bulletin 79-O1, "Environ Qualification of Clan 
IE Equipment, " M/liit of II lustematlc evaluation program 
plant* for which no action li rtqulrad. 

O'dEILLY, J. P. Region a, Atlanta, Office of the Director, 

79/02/OB. 8pp, 

7702M0121 DOCKET 90-416 Orand Oulf Nuclear Station. Unit 1 
Farward* IE Info Notice 79-03, "timitorque Valve Oearid 
Liwit Buitc.h Lubricant." 

O'REILLY, J. P, Region 2, Atlanta, Office of the Director. 

79/OB/09, IP. 



7902010064 DOCKET 50-417 Orand Oulf Nuclear Station, Unit 2 
Application for Amend 87 to application for licences. Amend 
U In form of answers to questions re FSAR- per MRC 7B0627 
Itr. 
STAMPLEV, N. L. Mississippi Power !< Light Co. 79/O1/29. Ip. 

7909010069 DOCKET 90-417 Grant) Oulf Nuclear Station. Unit S 
Application for Amend 27 to F5AR. Discusses safety 
features, containment sys, ECCB, habltablllty iy>. fission 
product removal tt control sys & Intervlce imp of Class S & 
3 components. W/nel oversliod drautngi, 
* Mississippi Power & Light Co. 77/01/31. 140pp. 

79020B0138 DOCKET 50-417 Orand Oulf Nuclear Station, Unit 2 
Forwards IE Intp Hept* 3D-4U/7S-82 fc 30-417X76-22 on 
781213-13. No noncompl ianca noted. 

MUHPHV.C.E. Region 2, Atlanta, Reactor Construction (c Engineering 

Support Branch. 7B/12/2B. 2pp. 

7902090133 DOCKET 50-417 Orand Oulf Nuclear Station, Unit a 
IE Insp Reptt 309-416/79-83 fc 30-417/76-32 on 7B12J3-13. No 
nontompliance noted. Major areas InipectcdrQA imp lament ing 
procedurBs, protection of installed electrical eq.ulpmenti 
fire suppression aqulpment !< qualltv record*. 

RUFF.A.B., BRVANTiJ.C. Region 2, Atlanta, Reactor Construction 

h Engineering Support Dranch. 7S/18/37. 4pp, 

7902360136 DOCKET 50-417 Orand Oulf Nuclear Station, Unit 2 
Forward* IE Insp Jlepts 30-416/78-81 St SO-417/7B-81 on 
781213-13. No noncompllance noted. 

MURPHY,C.E. Region 2, Atlanta, Reactor Construction b Ennlneering 

Support Eranch, 79/01/03. 2pp. 

79022SQ141 DOCKET 50-417 Orand Oulf Nuclear Station, Unit E 
IE Imp Rtpt 30-416/76-81 (c 50-417/7B-81 on 7B1213-15. No 
noncompl lance noted. Major areas inspected: <JA program 
Implementation, welding ectivitiaiiNRC repor-tingi cadweldlnn 
observation h intp of const activities, 

RAUSCH,J.K.. OOUOE-M, J. , HERDT.A.R. Region 2. Atlanta, Reactor 

Construction Si Engineering Support Branch. 79/01/O3, 9pp. 

79082S0446 DOCKET 90-417 Orand Oulf Nuclear Station, Unit 2 
Forward* IE Insp Rapts 90-416/78-23 b 90-417/76-23 on 
781227-29. No noncofflpliance no(ed. 

MURPHY, C.E. Region S. Atlanta, Reactor Construction b Engineering 

Support Branch. 79/01/12. Bpp, 



120 



DOCKETED ITEMS 



7902380443 DOCKET 50-417 Grand Gulf Nuclear Station. Unit 2 
IE Insp Repts 50-416/78-23 , 50-417/78-23 on 761337-39 No 
Tioncompl lance noted. Major areas inspected: reactor coolant 
pressure boundary pipe melding activities t, records, t 
safety-related pipe welding activities. 

CHOWLEV. B. R_ . CONLON.T.E. Region 3, Atlanta, Reactor 

Construction S, Engineering Support Branch. 79/O1/12. 7pp. 

7703030038 DOCKET 50-417 Orflnfl Gulf Nuclear Station. Unit 2 
Act receipt of JE Imp Kept 50-416/78-20 (, 30-417/78-20, 
on 7B11SB-120M.NO proprietary info 
HCOAUCHV, J. P. Mississippi Rower J, Light Co. 77/O1/I5. Ip. 

79032101QB DOCKET SO-417 Grand Gulf Nuclear Station, Unit 2 

-,T e " ipt P IE Irl5p Be l> t! > SO-4IA/7B-22 b 50-417/78-22 on 

7BI313-13. Ha proprietary info 

MCQAUCHY, J. P. Mississippi Pouer & Light Co. 79/01/24. Ip. 

79022B0534 DOCKET 50-417 Grand Gulf Nuclear Station, Unit 2 
"T"""? 1 IE Bulletin 79-O1, "Environ dual i f ication of Cla s , 
IE Equipment M/li.t of 11 systematic evaluation program 
plants fnr which no action is required 

79? J spp. RBBl n a ' Allanta - otfi " r the """- 

7902330121 DOCKET 90-417 Brand Bulf Nuclear Statin*. Unit 2 

r? T rr r i!M e .. Ii "z Noti " ~ 3 ' 't-i-utorp.... vaiv B aeared 

Limit Switch Lubricant." 

" B9lDn 3 ' Atlanta ' DfFi " * the Director. 



79033A0343 DOCKET 30-423 Millstone Nuclear Pomer Station, Unit 3 
""""' r "J""'" s re Bg Purging & venting. 

""I""" fi" OF.r.tl.n. 



79Q32S04S3 DOCKET 50-423 Millstone Hvtlmmr Pouer Station, Unit 3 
K-Vt addl info re financing B* refusing outag* bldg 
const.W/encl questionnaire. s fl 

Z1EMANN.D. L. Operating Reactors Branch 2. 79/01/23. 4pp. 

79G3300QA7 DOCKET 50-423 Hlll.ton. Nuclear Pawer Station, Unit 3 
?? P ?* E D <Tsemont 3 to NELIA Blntfer EB-1 5, EB-16. XB-IS t. 
UroughT??? "" "" r 1 "' 7 ' eitEnd1 "!' iT.der protection 
BEOEa.R.H. Northeast Utilities. 79/03/O9, 9pp. 

7902130093 DOCKET 30-423 Millstone Muclear P*>u, B r Station, Unit 3 

V' d S r *:?' nt t 9 ? * r P llq MF -52'"ftiv B 790101. 
.M. Northeast Utilities. 79/02/OA. 3pp. 



Fn M-4B3 HllUfcon. N UC I e ar Po^er Station, Unit 3 

Forwards certified cop.es of Endorsement 57 to Policy NF-173 
re premium t, amend of Condition 4 For 1979 
BEQEfl.R.M. Mort^east Utilities. 79/02/Ofi! 2pp. 



B 2 M ? 3 M *-f Nlr Pouer Static, Unit 3 
Forwards IE Insp Pept 50-423/7B-OA an 7B1128-120I No 
noncomjil lane e noted. 

^tn'?' T ' R ! fl i Qfl '' Phila '"'lp'"''. factor Construction t 

Engineering Support Branch. 7H/12/36. 2pp. 



DOCKET M--H3 Millstone Nuclear Pouer Station, Unit 3 
i!fl2 " B 30 -f a3 '' 7a - 06 "" 7Bliaa-iroi. No ^compliance 
noted. Major areas inspected: fl i,alitg verl f ication records 
far CDTitainment structure concrete t, related saecs t> 

^ 






VAOELA.A A, CHAURDHARY.S.K. 

"" 1601 " Ccn6trutli( " 1 & Ennin 



Region i, 

nj Bpp Or t Branch. 



7V02010270 DOCKET 5O-433 Millstone Muclear Pouer Station, Unit 3 
Forward. IE Circular 79-02. "Failure of 120 Volt Vital AC 
- Supplies." 

Regl0n 1( Phila[lel P hia ' OtHt. of the Director. 



7902020320 DOCKET 3O-423 Millstone Nuclear PouiBr Station, Unit 3 
Ack receipt of 7B1237 interim rept on significant deficiincy 
re UestinghoUBB AR-4O relays. 

CARLBDN.H.T. Region 1, Philadelphia, Reactor Construction t, 

Engineerinn Support Branch. 79/01/12. Ip. 

790203032S DOCKET SO-4E3 Millstone Nuclear Po.r Station, Unit 3 

Interim rept on potential defici B ncy in design t cont of 

Hestinohouse AR-4O relau installed in facility solid st>te 
protection sya. 

CDUNS1L, M. 0. Northeast Utilities. 7B/12/B7. Ip. 

7902050101 DOCKET 30-423 Millstone Nuclear Power Station, Unit 3 
Repts on insp of 10O QA Categoru ! TUBECD pipeline .pools. 
Results indicate TUBECO OA program is properly inpl.n.nted. 
nut to improper matl use. insp hold point on pipe cuttino 
operation is retained an ASME III work 
COUNSIL, U. 0. Northeast Utilities. 79/01/29. 2pp. 

79020501B1 DOCKET 50-434 Alvin W. Vojtle Nuclear Plant, Unit 1 
Responds to alleged Inaccuracy 6 inadequacy of 7B1031 
contentions by Beorglans against Nuclear Energy to suipvnd 
eont permits. H/encl re load forecasts, generation capacities 
& reserves. 
EHHENSPEROER.H. Beargia Power Co. 79/O1/30. 7pp. 

790S33D061 DOCKET 30-424 Alvin W. Vogtle Nuclear Plant, Unit 1 
Informs that TRADDC Pamphlet 350-30. " Internrvice Procedures 
PDr Instructional Sys Development- referenced in NUREQ-0319 
is available in microfiche form from NftC 
HESAW.W. J. Division of Document Control. 7B/11/20. 3pp. 

790307025-7 DOCKET 50-424 Alvin H. Vogtl. Nucl.ar Pl.nt, Unit 1 
Agrees U /NRC's decision to extend govt indemnitu to spent 
Fuel stored at reactor site other than uhere it uas 
generated. 
HHITMER.C.F. Georgia Pouier Co. 79/01/30. Ip. 

79020B0150 DOCKET 5O-434 Alvin U. Vogtle Nuclear Plant, Unit 1 

.,T "* f IE InB[1 R P fc * 50-424/78-10 t, 60-4HS/7B-10 on 

7B121S-21. No proprietary info. 

BTAFFA.H.U. Qearnia Power Co., 79/01/29. Ip. 

790HOS0153 DOCKET 5O-424 Alvin H. Vogtle Nucl.r Plant. Unit 1 
Forward* IE Insp Repts 50-424/7B-10 & 50-435/78-10 on 
7B121E-21.No noncompliance noted. 

SUTHERLAND, J. T. Region S. Atlanta. Fuel Facility t, Materials 

Safety Branch. 79/01/11. 2pp. 

79020B01B6 DOCKET 50-424 Alvin M. Vagtle Nuclear Plant. Unit 1 
IE Insp Repti 5O-424/7S-10 t. 50-425/7S-1O on 7B13ie-21.No 
noncompliance noted. Major area* inspected: .nviron U.urs, 
including control program. const effects monitoring, onsite 
metoorolDglcal ffleasuriments, uaite mgt & erosion. 
CUNN1MQHAM.A.L., ALLEH.J.R. , HUFHAM, J. H. Re fl ion2, Atlanta, 

Fuel Facility & Materials Safety Branch. 79/01/10. 4pp. 

7902200071 DOCKET 5O-424 Alvin W. Vogtle Nucl.ar Plant, Unit 1 
Forward. IE Info Notice 79-01, "Bergen-Pateraon Hydraulic 
Shock 6 Suay Arrestors (HSSA). " 

' P - R stt"i 2- Atlanta, Office of th. Director. 

5pp, 



790B2B053i DO.CKET 5O-424 Alvin W. Vo a tle Nuclear Plant, Unit i 
Forwards IE Bulletin 79-O1, "Environ Qualification of Class 
IE Equipment. " H/list of II oystematic evaluation program 
plants for uihierh no action is required. 

* ' 2' R * oio " a- Atlanta. Office of the Director. 



7702380115 DOCKET 50-434 Alvin H. Vogtls Nuclear Plant. Unit 1 
Forwards IE Info Notice 79-03, "Limltorque Valve Oeared 
Limit Sultch Lubricant. " 

79/03/09' J 3PP RBflic " 2 ' Atl " lta - Office of the Dirtctor. 



7902I3003Z DOCKET 50-423 Millstone Nuclear P QUleT Station, Unit 3 
>rud. IE Info H Dt ice 77-01, "Bergen-Paterson HydrauJ c 
Shncl & Buiay Arre*tora (HSSA). " 

79/Oa/03 H ' 2 Pp HBBl n '' Philailel P hi *' Office D f the Director. 

7902280477 DOCKET 5O-4B3 MiUBtnne Nuclear Power Station. Unit 3 
Forward. IE Bulletin 79-O1, "Environ Qualification of Class 
IE EquipmBnt. U/list of 11 systematic evaluation program 
plants for uhich tic action is required. 

^ Rt >ai" 1' Philadelphia. Office of the Director 



79020301B1 DOCKET 50-435 Alvin H. Vogtle Nuclear Plant, Unit 2 
Responds to alleged inaccuracy & inadequacy of 781031 
contentions by Georgians against Nuclear Energy to suspend 
const permits. W/encl re load forecasts, generation capacities 
fc reservas. 
EHRENSPERGER.H. Georgia Power Co. 79/01/3O. 7pp. 

7902330061 DOCKET 50-435 Alvin H.' Vootle Nuclear Plant. Unit 2 
Informs that TRADOC Pamphlet 350-30. "Inters.rvice Procedure* 
for Instructional Sys Development" referenced in NUREO-0219 
Is available in microfiche form from NRC. 
BESAH.H.J. Division of Document Control. 78/11/20. 3pp. 



DOCKETED ITEMS 



121 



7902090239 DOCKET 3O-423 Alvin U.. Vngtle Nuclear Plant. Unit 2 
Agrees w/NRC's decision to eitend govt indemnity to spent 
fuel stared at reactor site other than where it uas 
lihiratid. 
UH1TMER.C.F. Georgia Power Co. 79/O1/3O. lp. 

7902080130 DOCKET 30-433 Alvin W. Vogtle Nuclear Plant. Unit 2 
Act receipt of IE Insp Repts 50-4H4/7B-10 b 30-433/78-10 on 
781218-21. No proprietary info. 
BTAFFA.R.W. Georgia Power Co. 77/01/29. lp. 

7903080133 DOCKET 50-435 Alvin W. Vogtle Nuclear Plant. Unit 3 
Forwards IE Insp Repts 50-4E4/7B-1O & 30-423/78-10 on 
781218-21- No n on compliance noted. 

SUTHERLAND. J. T. Region 2. Atlanta. Fuel Facility t Materials 

Safety Branch. 79/D1/11. 2pp. 

79020B0136 DOCKET 30-423 Alvin W. Vogtle Nuclear Plant, Unit 2 
IE Inp Repls 50-424/7B-1O t. 50-42S/7B-1O on 7B121B-21.Nn 
noncoaiplianca noted. Major areas inspected: environ Issues. 
including control program. const effects monitoring, onsite 
meteorological measurements, uaste mgt fc erosion. 
CUNNINSHAM. A. L. . ALLEN. J. R. , HUFHAM, J. W. Region B, Atlanta. 

Fuel Facility h Materials Safety Branch. 79/01/1O. 4pp. 

7902200071 DOCKET 3O-423 Alvin W. Vogtle Nuclear Planti Unit 2 
Forward* IE Info Notice 79-01. "Beraen-Pateruon Hydraulic 
Shock tc Bway Arresters (HS8A). " 

O'REILLY, J. P. Region 2, Atlanta, Office of the Director. 

79/02/02. 3pp. 

7902380986 DOCKET SQ-42S Alvin M. Vogtl* Nuclear Plant. Unit 2 
Forwardi IE Bulletin 79-O1, "Environ Qualification of Class 
IE Equipment. " W/lit of 11 systematic evaluation program 
plants for which no action is required. 

O'REILLY, J. P. Region 2, Atlanta, Office of the Director. 

79/02/OB. 2pp. 

79023H0113 DOCKET 3O-423 Alvin W. Vogtle Nuclear Plant. Unit 2 
Forward* IE Info Notice 79-03. "Limit or qua Valve Oaared 
Limit Switch Lubricant." 

O'REILLY. J. P. Region 2, Atlanta. Office Of the Director. 

79/02/07. BPP. 

7902120101 DOCKET BO-433 UC-Santa Barbara Research Reactor 
Forward* 1978 annual rept of operations for L-77 reactor, 
Llcinie R-124.Encl withheld (ref 10CFH3.790K 
KftDEBiR.J. Affiliation Unknown. 79/02/06, 1pp. 

790BOB0219 DOCKET 8TN-5O-43 7 Floating Nuclear Plant 

Forward* trip rept re eichange of sump water w/basln water 

urroundlng floating nuclear plant after postulated core 

melt through accident. M/info re sump water-basin water 

exchange model. . 

HADA. P. B. Offshore Power Systems (subs, of Hestinghouse Electric 

Corp. ). 79/01/30. 24pp. 

7902090333 DOCKET STN-50-437 Floating Nuclear Plant 

Inform NRC "Mechanical Handling Bys Definition Drawing 
Elevator for Safeguards 1. " document 423H011/C Is being 
transmitted to US Coast Ouard for review & approval. 
HA6A.P.B. Dfflhore Power Systems <subs. of He*tinghouse Electric 
Corp. >. 79/01/31. lp. 

7902130110 DOCKET STN-30-437 Floating Nuclear Plant 

Submit* addl Info re containment shell buckling criteria b 
application. Requests concurrence u/approach before inclusion 
In rept. 
HAOA.P. B. Mountaineer. Inc. 79/01/31. Bpp. 



7902270323 DOCKET 8TN-3Q-437 Floating Nuclear Plant 
No comment necessary for FEIS < NUREO-OS02 > . 
BAOOETT.C. North Carolina, State of. 79/02/19. lp. 



7902010194 DOCKET STN-30-437 Floating Nuclear Plant 

Forwards FES Part III re floating nuclear power plants. 
Requests relevant comments be sent to NRC before 790BOB, per 
Office of Mgt t Budget Circular A-93. H/D encl. 
HCCONNAUOHHAY. J Maryland. State of. 79/O1/1S. lp. 



7903010133 DOCKET BTN-5D-437 Floating Nuclear Plant 
Ack receipt nf FEIS (NUREG-0302). "Floating Nuclear I 
Plants.-" Hill forward comments at later date. 
BAGQETT.C. North Carolina. State of. 79/02/01. lp. 



7902120311 DOCKET STN-50-437 Floating Nuclear Plant 

Ack receipt of FEIS (NUREQ-0503). "Floating Nuclear Powe 

Plants. " No comment* offered. 

HAVMARD.N. Delaware, State of. 79/02/06. lp. 



7902020064 DOCKET STN-50-437 Floating Nuclear Plant 

Forwards Electric Power Research Inst test rept referred to 

In nema Frnro J D'Drlen forwarded by NRC on 781232. 

BOHINKI.S. M. Office of the Eiecutive Legal Director. 79/O1/O2. lp. 

7902020068 DOCKET STN-5O-437 Floating Nuclear Plant 

"Preliminary Results of Turbine Missile Casino Tests." 
Provides data on both energy-absorbing mechanisms of impact 
process &. i f breakthrough occurred. eii t conditions of 
fragment. Final rept to Include more detailed data. 
YOSHIMURA. H. H. , SCHAMAUN, J. T. Bant is Laboratories. 7B/10/31. 
31pp. 

79020B0332 DOCKET STN-50-437 Floating Nuclear Plant 

Consents to Offshore Pouer Systems motion that direct briefs 
be filed by 790105 t. reply briefs by 7901 15. H/7B1232 request 
for e>tension of time for filing. 
CONNER, T.B. Conner. Moore t Cnrber. 79/O1/02. lp. 

7902230219 DOCKET BTN-50-437 Floating Nuclear Plant 
Cites failure to receive applicant 7B1O31 Itr to NRC 
describing proposed schedule for responding to updato review 
matters. Requests Board direct applicant to cease negligent 
behavior immediately. 
ROISMAN.A. Z. Natural Resources Defense Council. 79/01/11. 2pp. 

7901230234 DOCKET 8TN-50-437 Floating Nuclear Plant 

"Analysis of Public Consequences FrSm Postulated Severe 
Accident Sequences in Underground Nuclear Power Plants." 
ARM1STEAD.R. A. California, State of. 77/12/31. 25Opp. 

7902010383 DOCKET STK-30-437 Floating Nuclear Plant 

Applicant's reply brief re mfg license For floating nuclear 

plant. Decision ALAD-4B9 withholding applicability of annex 

to floating plant cannot stand. 

COWAN, D.Z.i DAUOHERTY. T. M. . KENRICK. J. R. Offshore Power Systems 

(subs, of Uettinnhause Electric Corp. ). 79/01/22. 34pp. 

7902020368 DOCKET STN-aO-437 Floating Nuclear Plant 
NRC reply brief In support of affirmative finding on 
certified question. Delieves Class 9 accidents are proper 
subject for consideration In environ statement. Believes OPS 
argument should be rejected. U/Certlf icate of Svc. 

SOHINKIiB.M. , MALBCH.M.O. Office of the Eaecittlve Legal Director. 
79/01/22. 19pp. 

7902030043 DOCKET STN-BO-137 Floating Nuclear Plant 

Reply amicus curiae brief of Union of Concerned Bcie-ntists. 
Believes applicant's facility should receive special 
treatment since it is fundamentally different. Hopes NRC will 
decide issues in public. M/Certif Icate of Svc. 
MEIBBtE.R. Sheldon. Harmon & Rolsman. 79/01/33. 7pp. 

7902070013 DOCKET STN-SQ-437 Floating Nuclear Plant 
Forwards NRC correspondence re Floating nuclear plant 
licensing requested by UCS. 

BOHINKI.8. M. Office of the Eiecutlve Legal Director. 79/O1/30. 
3pp. 

7903070014 DOCKET 8TN-30-437 Floating Nuclear Plant 

Forwards "Rept on Consideration of Core Melt dawn as a Design 
Basts Requirement b Alternate Couries of Action to Conclude 
Review of Floating Nuclear Pouer Plant <FNP) Application. " 
Requests comments by 730407. 
CASE.E. 0. Office of Nuclear Reactor Regulation. 75/03/31. lp. 

7902070016 DOCKET BTN-50-437 Floating Nuclear Plant 

Forwards rept on core melt consequences & alternate ways to 

process floating nuclear power plant (FNP) applications. 

CABE.E. 0. Office of Nuclear Reactor Regulation. 73/03/31. lf>. 



7902010143 DOCKET STN-30-437 Floating Nuclear Plant 
Ack receipt of FES Part III CNUREG-0303). 
DIBILVESTRE.A. Treasury. Dept. of. 79/01/19. lp. 



7902030317 DOCKET BTN-30-437 Floating Nuclear Plant 
Ack rtclpt of FEB Part III (NUREO-OSOH). Review is In 
progreis. 
OULLETT, 0. P. Louisiana, State of. 79/01/29. lp. 



7903070017 DOCKET BTN-50-437 Floating Nuclear Plant 

"Rept on Consideration of Core Meltdown as a Design Dasii 
Requirement tc Alternate Courses of Action to Conclude Rsvieu 
of Floating Nuclear Pouer Plant (FNP) Application." 
Discusses problems tt options. 
* Office of Nuclear Reactor Regulation. 73/03/34. IBpp. 



122 



DOCKETED ITEMS 



79020700IB DOCKET STN-30-437 Floating. Nuclear Plant 

Responds to 73033! memo on core melt considerations. Suggest s 
torn msltdoyn consBque-nces Por floating plants may he worse 
than for land facilities due to floor dispersion over water. 
KGUTS.H.O.C. Dffico oF Nuclear ReaulotaTy HtBuflrch. 79/O4/11. 
2pp. 

7102070019 DOCKET GTN-SO-437 Floating Nuclear Plant 

Forwards lo-gal memo re neeil to discuss Class 9 accidents In 

saf-etu, evaluations & EI9. Rec omroend* Alternative 4 In "Kept 

on Consideration of Core He 1 tfloun" to be ad-opted. 

SHAPARiH.H, Office of the Eiecutlve Legal Director. 73/04/16. 

30pp. 

79020700S1 DOCKET BTN-90-437 Floating Nutltar Plant 
Discusses i-upt on floating plant licensing. Agree* 
Alternative 1 li untenable. Doubts Alternative 4 will solve 
problem. Del iev*a licensing depends on plant design adequacy 
& DTI advisability of locating plant offshore. 

HANAUER.H.H. Office of the Eiecutive Director for Operations. 
79/04/18. llpp. 

7902070030 DOCKET STN-30-437 Floatina Nuclear Plant 

QrdBTs an extension to 79020'? Far Nltc review of ALAB-817. 
CHILK.B.J. Office nf the Secretary of the dojnmia*ion. 79/OS/01. 



7902220201 DOCKET HTN-SO-437 Floating Nuclear Plant 

Applicant'* rept to ABLO re statu* of hearings It motion to 
tabllflh scKodul a. Proponed schedule 1 encl. 

OOUOHERTV.T. H. , COWAN, D. Z, , KENF1ICK, J. Ft. Mountaineer, Inc. 
79/02/Ofa. 7pp. 

790S330043 DOCKET BTN-90-437 Floating Nuclear Plant 
Motion for ordor disroi*ing NRDC programmatic Impact 
itateront contention at an IKHJB dug to NHDc's Failure to 
comply U/7BOBOI AELB order filing a nation by 7901H9, Related 
papers Si Certificate of Bvc nel. 

COWAN. D.Z, , DAUOHEKTY. T. rt. , KENH1CK, J. R. Mountaineer. Inc 
79/03/Oi, 13pp. 

7702330047 DOCKET BTN-SO-437 Floatina Nuclear Plant 

Forwards FES Part III ( NUREQ-0502) providing a comparison of 
risk* to environ from accidental release* of radioactivity 
tar floating i< land-based nuclear power plants. 
uALLAWD, R. L. Environmental Project Branch 1. 79/12/29. lp. 

7902330070 DOCKET STN-30-437 Floatlnfl NueUar Plant 
Notlc* of availability of FES Part III (NUREO-OSOa) , 
"Comparison of Disks from the Accidental Release of 
Radioactive tn the Envirnn for Floating tc Land-Based Nuclear 
Power Plants, " 
BALLARD, R. L. Environmental Project Branch 1. 79/12/29. 3pp. 

7903370327 DOCKET flTN-50-437 Flootino Nuclear Plant 
Ack receipt of FES Part III (NUDEO-OSO?). Circulated 
notification to state agencies For comments. 
EURE.J, H. Haui Jrsey, State of. 79/03/09, lp. 



7902140372 DOCKET SO-43B Bellefonte Nucloar Plant, Unit 1 
Forwards affidavit certifying that Amend IB to F8AR uas 
served upon specified individuals on 790124. 
MILLS. L. M. Tennessee volleg Authority. 79/02/02. 2pp. 

7902120050 DOCKET 90-43^ Qellefonte Nuclear Plant, Unit 1 
Forwards IE Info Notice 79-01, "Bergen-Paterson Hydraulic 
Shock It Saaij Arrtstors (HSSA)-. " 

D'REILLV, J.P. Region 2, Atlanta, Office of the Director. 

79/03/02. 3pp. 



7902200134 DOCKET 30-43B Dallefonte Nuclear Plant, Unit 1 
Forwards IE Info Notice 79-03, "Limltorque Valve Qiarid 
Limit Switch Lubricant, " 

O'REILLY, J. P. Region 2, Atlanta, Office of the Director. 

79/02/09. BPP. 



79022B003B DOCKET 90-438 Dellefonte Nuclear Plant, Unit 1 
Forwards IE Inap Rpts 30-43B/7B-20 & 90-439/78-20 on 
7812L1-14. No noncompl lance noted. 

MURPHY. C.E, Region 2, Atlanta, R*actor Construction & EnginMrir.) 

Support Branch. 7B/12/26. 3pp. 

7902380044 DOCKET 30-438 Billefontt Nuclear Plant, Unit 1 
IE Insp Repts 5O-43B/7B-20 b 90-439/7B-20 on 781311-14. No 
ntmcoinplianca noted. Major anas Impacted: protsdurs contrail 
OC InvostigativB rept di spoiition, concrete wall placimnt fc 
subcontrattor QA mnual rovlsui. 

WRIGHT, R.H., WlLCOXnJ. D. , HERDT, A. fi. Region 3, Atlanta, R*4cti>r 

Construction d Englnterltig Support Branch. 70/12/22, 9an. 

790314O27d, DOCKET 90-439 DellsFonte Nuclear Plant, Unit 3 
Forwards electrical instrumentation fc control drawings, 
Drawings to be uilthheld (ref 10CFRB. 790). W/af f idavit of 
JH Taylor. 
OILLELAMD, J. E. Tennessee Val leg Author 1JJ, 79/02/08. Bpp, 

7702260193 DOCKET 90-439 Bellefonte Nuclear Plant, Unit 2 
Bocause uti 1 const schedule Is being delayed at laait an* 
year, review schedule is baing changed to reflect delay. 
BOUF1NIA, A. Light Mater Rnactors Branch 3. 79/08/09. In. 

770214O278 DOCKET 90-439 BlllttFonte Nuclvar Plant, Unit S 
Forwards affidavit certifying that Amend 18 to FBAR uai 
served upon specified individuals on 790 12i, 
MILLS, L.H. Tennessee valley Authority. 79/02/02. 2pp. 

790212QOSQ DOCKET 90-439 Bellefonte Nucliar Plant, Unit 8 
Forwards- IE Info Notice 79~01, "Bergen-Paterson Hydraulic 
Shock Ji Bway Arrestol-s (HSBA). " 

O'REILLY, J. P. Region 2, Atlanta, Office of the Director, 

79/03/02. Spp, 

79022Q0134 DOCKET 90-439 BellePonte Nuclear Plant, Unit tt 
Forwards IE Info Notice 79-03. "Limitoritue Valve tar id 
Limit Switch Lubricant. " 

O'REILLY, J.P. Region 2, Atlanta, Office of the Director. 

79/02/09. SPP. 



7902Ko0314 DOCKET STN-30-437 Flootlno Nuclear Plant 

Informs NRC of recent changes at upper mgt at Offshore Power 

Byt. 

HAOA.P. B. Mountainear, Inc. 79/03/1B. lp. 



79031E0229 DOCKET BTN-50-437 Floatinj Nuclear Plant 

Forward i IE Info Notice 79-01, "Berien-Paterson HyitriuHc 
Qhoek l< Buaij Arreatora (H6SA>. " 

O'REILLV. J, P. Region 2, Atlanta, Office of the Director, 

79/02/02. 4pp. 

79022B0043 DOCKET aTN-SO-437 Floating Nucl&ar Plant . 
Forwards IE Info Noticfr 79-O3, "Linltorqua Valva G-eared 
Limit Biultch Lubricant." 

O'REILLY. J. P. Ragion 2. Atlanta, Office of the Director. 

79/02/O9. lp. 



BDCKET 90-43B Dallefonte Nuclear Plant, Unit 1 
Forwards electrltal instrumuntatioTi !< control drainings. 
Drauiingt to be withheld tret 10CFR2. 79O). H/af f idavit of 
JH Taylor. 
OILLELAND- J. E. Tenns*ea Vallaij Authority. 7WOB/OB. Bpp. 



7902BB0172 DOCKET SO-4aB Dellefonte Nuclear Plant, Unit 1 
Btcautr util const schedule 1 being delayed at least ore 
gaarirevleu schedule is being changed to reflect dila. . 
BOURNIA.A, Light Hater Reactor* Dranc.h 3, 79/02/09, lp. 



79022Q003B DOCKET 90-439 BellePonte Nuclear Plant, Unit S 
Forwards IE Imp Repfcs SO-fl3S/7B-20 fc 90-439/7Q-20 on 
7B1311-14. No noncompl lance nottd: 

MURPHV.C.E. Region 2, Atlanta, Reactor Construction b Englnitrlni 

Support Branch. 78/12/26. 2pp. 

79022B0044 DOCKET 90-439 Bellafonte Nuclear Plant, Unit 2 
IE Insp Repts 30-433/78-20 t< 90-439/7B-20 on 7B12H-14. No 
noncoflipllance noted. Major areas Inspected: procedure control., 
QC investigative rept disposition, concrete wall placement ft 
subcontractor QA manual revieu. 

WRIGHT, R.W.. WILCDX.J.D., HERDT, A. R. Region 2, Atlanta Rtaitor 

Construction d Engineering Support Branch. 78/12/23. 9pp. 



79020501 Si DOCKET 90-440 Perry Nuclear Power Plant, Unit 1 
Forwards environ licensing docunentcOH EPA 401 
Certif ication.OH EPA Permit to Install, Armij Corps of 
Engineers Intake-Discharge Form It tt OH EPA questions It 
Cleveland Electric responses re plant design. 
. DAVIDSON, D.R. Cleveland Electric Illuminating Co. 79/01/39. 



7902230061 DOCKET 80-440 Perry Nuclear Pouer Plant, Unit 1 
Informs that TRADDC Pamphlet 350-30, "Interservice Procedure* 
for Instructional Sy Development" referenced In NUHEfi-0219 
is> available in microfiche) form from NRC. 
BE9AH,W. J. Division of Document Control. 7B/11/30. 3pp. 

790S2BO207 DOCKET 3D -4 40 Perry Nuclear Pouer Plant, Unit 1 
Forwards IE Inap Repts 30-44Q/7B-16 b 30-441/78-15 on 
7B1EO3-GB. No neneompHance noted.. 

HEIBHHAN,R.F, Region 3, Chicaoo, . Reactor Construction & 

Engineering Support Branch. 79/01/10. 2pp. 



DOCKETED ITEMS 



123 



7902200331 DOCKET 80-440 Perry Nuclear Pettier Plant, Unit 1 
IE Invp Reptt 3O-440/78-16 t< 90-441/78-15 on 7B12O3-OB. No 
none nmp 1 1 ance noted. Major areas inspec tod: 1 icensee ant ion on 
previous items t on NFiC 7Q020B Itr, ongoing const It OA 
imp 1 smarting procedural re electrical component* < systems. 
HAXWELU O. F. . HUGHES, J. . SPESBARD, R, L. Region 3, Chicago, 

Reactor Construction & Engineering Support Branch. 79/01/09. 
10pp. 

7902120O82 DOCKET 5Q- 440 Perry Nuclear Pouer Plant. Unit 1 
F-oruBTdB IE Info Notice 79-OI, "Bergen-Paterson Hydraulic 
Shock t< Buail Arrestors (HS3A). 

KEPPLEFl. J. 8. Region 3. Chicago, Office of the Director. 79/02/oa. 

Ip. 

790SZ1020S DOCKET 3O-440 Perry Nuelaar Power Plant, Unit 1 
Ac k recoipt of 79-01 IB Itr informing NRC of steps taken to 
correct violations noted in IE Inap Repts 30-44O/70-14 t< 
30-141/78-13. 

HEIBHMAN.H. F. Region 3, Chicago. Reactor Construction b 

Engineering Support Branch. 79/02/02. Ip. 

79 022 ICE 13 DOCKET 30-440 Perry Nuclear Pouer Plant, Unit 1 
Respond* to NRC 7B1213 Itr re Violations noted in IE Inap 
Rept SO-440/78-14 fc 50-441 /7B-13. Corrective actions: create 
adequate program for inap of safety-related backfill 
activities & f o 1 loiuup/c 1 OBe-out surveillanca dona. 
DAVIDSON, D. R. Cleveland Electric Illuminating Co. 79/O1/1B. 4pp. 

790B31021B DOCKET SO~440 Psi-ry Nuclear Pouer Plant, Unit 1 
Forwards IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment." W/llet of 11 systematic evaluation program 
plnts for uihlch no action is required. 

KEPPLER, J. 0. Region 3. Chicago, Office of the Director. 77/02/09. 

Ip. 

7902270330 DOCKET 9Q-44Q Perry Nuclttar Pauar Plant, Unit 1 
Forwards. IE Info Notice 79-O3, "Limitoro.UH Valve Conrad 
Limit Switch Lubricant. " 

KEPPLEFtr J, 0. Region 3, Chicago, Office of the Director. 79/02/09. 

Ip. 

790223012O DOCKET SO-440 Perry Nuclear Power Plant, Unit 1 
Responds to 790112 telcon 6 forwards "Interim Rapt an 
Significant Dtf ic 1 ncy: Bt-M Constructors, Inc GA Program 
Brealntoion Regarding Control of 8&M Subcontractor, Hal vorsen 
Dollar fe Engineering Co." 
DAVIDSON.D. R. Cleveland Electric Illuminating Co. 79/02/12. Ip. 

790223O128 DOCKET 50-440 Perry Nuclear Pouiar Plant, Unit 1 
"Interim Wept on, Significant Oaf ictency : 8&M Constructors, 
Inc OA Proflram Drealdjoun Regarding Control of BfcM 
Subcontractor, Halvorson Boiler d Engineering Co," 
* Cleveland Electric Illuminating Co. 79/03/OB. IBpp. 

790303016 DOCKET SO-441 Perry Nuclear Power Plant, Unit a 
Forwards environ licensing documents;OH EPA 401 
Certif icfltion.QH EPA Permit to Install. Army Corps of 
Engineers Intake-Discharge Permit b OH EPA questions t 
Cleveland Electric responses re plant design. 
DAVIDSON, D. R. Cleveland Electric Illuminating Co. 79/01/S9. 24pp. 

79022300A1 DOCKET 90-441 Perry Nuclear Power Plant, Unit 2 
Inform* that TRADOC Pamphlet 350-30, "Intel-service Procedure* 
for Instructional Sya Devolopmont" referenced in NUREQ-0219 
1* available in microfiche farm from NRC. 
BESAW.W. J. Division of Document Control. 78/11/30. 3pp. 

7902290207 DOCKET S-O-441 Perry Nuclear Pouer Plant, Unit 2 
Forwards IE Insp ReptB 50-440/78-*16 t. BO-141/78-19 on 
791305-OB. No none ompl lance noted. 

HEIfiHMAN, R. F. Region 3, Chicago, Reactor Construction & 

Engineering Support Branch. 79/O1/10. Spp. 

7902230321 DOCKET 30-411 Parry Nuclear Pouer Plant. Unit S 
IE Insp ReptB 5.0-440/70-16 E< 90-441/7B-13 on 7B1B03-OB. No 
noncamp 1 iance noted. Major areas inspected: licensee action on 

Srevlous items b on NRC 7B0208 Itr, ongoing const d QA 
mpleniBnting procedures re electrical components & systems. 
MAXHELL, Q. F. , HUOHEQ, J. . BPESBARD, R. L. Region 3, Chicago, 

Reactor Construction & EnginBerlno Support Branch. 79/O1/O7. 
10pp. 



79O221O20S DOCKET 90-441 Prry Nuilear Paiuer Plant, Unit 3 
rick receipt of 790119 Itr informing NRC of stop -a taken to 
correct ulotationB noted In IE Insp Repts SO-44O/7B-J4 & 

Chicago, Reactor Cons ti-ur 1 1 an 
79/O2/O3. Ep. 



HE1SHMAN.R. F. Region 3, 

Engineering Support Branch 



7903210213 DOCKET 90-411 Perry Nuclear Poiuer Plant, Unit 3 
Responds to NRC 76121S Itr re Violations noted in IE Insp 
Rapt SO-440/70-14 b 30-141/70-13. Corrective ac t ions: create 
adequate program for Insp of saf ety-related backfill 
actlvitioa & follauiup/clDse-Dut mrue 1 1 lance done. 
DAVIDSON, D. R. Cleveland Electric Illuminating Co. 77/O1/19. 4pp. 

790221O213 DOCKET 30-441 Perry Nuclear Power Plant. Unit 3 
Forwards IE Bulletin 79-0 i, "Environ Qualification of Class 
IE Equipment. " U/list at 11 systematic evaluation program 
plant* for uhich no action is required, 

KEPPLER, J. O. Region 3- Chicago. Office of the Director. 79/02^09, 

Ip. 

7902370330 DOCKET 90-141 Perry Nuclear Power Plant, Unit S 
Forwards IE Info Notice 77-03, "Limi torque Valve Geared 
Limit Builtch Lubricant, " 

KEPPCER. J. O, Region 3- Chicaflo. Opfic of the Director. 79/OS/09. 

Ip. 

7902330120 DOCKET 90-441 Perry Nuclear Power Plant, Unit 2 
Responds to 790113 telcon l< forward a "Interim Rept an 
Significant Def Ic iency: S&M Construe tore, Inc QA Program 
Breakdown Regarding Control of SMI Suhc ontrac tori Ha Ivor sen 
Boiler fc En&ineeving Co. " 
DAVIDSON, D. R. Cleveland Electric Illuminating Co. 79/02/13. Ip. 

7902230120 DOCKET 80-441 Perry Nuclear POWDJ- Plant, Unit 2 
"Interim Rept on Significant Defic Iency : H&M Constructors, 
Inc QA Program Breakdown Regarding Control of StiM 
Subcontractor, HaJvoraen Boiler & Engineering Co." 
Cleveland Electric Illuminating' Cn. 79/Q2/QQ. 12pp. 

79O23H03S4 DOCKET 30-443 Beflbrook Nuclear Station^ Unit 1 
Forwards Amend 5 to CPPR-133 It 136 ( Foderal Regittar 
notice. * 

QOVD^R.B, Division of Project Management. 79/O1/31. 4pp. 

7903aB02BB DOCKET 30-413 aeabroDli Nuclear Station- Unit 1 
Amend 3 to const permit CPPR-135 ! Amend S to CPPR-13&, 
authorlilng transfara nf auinorihlp interests to MA Municipal 
Uholesale Electric Co. 
BOYD.R. B. Division of Project Management. 79/O1/31. 3pp. 

7902230061 DOCKET 50-443 Beabrook Nuclear Station, Unit 1 

Inform* that TFIADOC PampJilet 330-30, "Interservice ProcedurBE 
for Instructional By s Developniont" roferencod in NUREQ-0219 
Is available in micro ficJi n form from NRC. 
DEBAW, U. J. Division of Dncumcnt Central. 7B/11/30. 3pp. 

7902030055 DOCKET 90-443 Seabrook Nuclear Station, Unit 1 

Forwards errata to NRC alternative s-ite study test imony, Upon 

revleu of state of ME statute. MRC concludes that statute 

could not be raised at oumorih ip barrier, consequently 

applicant ulll have i to prove re-noonable aunerghip. 

BRENNEFi,L, Office of the EtKcmtive Legal Director. 79/O1/03. 7pp. 

7902020030 DOCKET 30-443 Bcabronk Nuclear Stotian, Unit 1 
Forwards "Errata In Direct Testimony of the NRC Btef 1 " to 
replace errata mailed 790103. 
BRENNER, L. Office of the Executive Logal Director. 79/01/10. 8pp. 

7902270211 DOCKET SO-A43 Seabroot Nuclear Station, Unit 1 
Announces A8LA3 schedule re Piling of proposed findings of 
fact 5< cone 1 unions at laui. Parties should submit msmorandin 
similar to District Court opinions. Forwards S exhibits: 
photos of tooling toiunr {< table of p opul at Ion. M/o anc 1 s. 
QREWNER.L. Office of tlie EiecutivB Uegal Director, 79/01/H2. 2pp. 

7902060030 DOCKET SO--143 Soflbroo* Nuclear Station, Unit 1 
Admits Into evidonce applicants' Eihlbit 79-1, "Raviaad 
Ordinances as Amendod through Sept t*}7&, " iesuDd 1 by the Tnuin 
af York, ME. 

DUFLD,M.E. Atomic Safffty and Licensing Appeal Pane 1 . 79/D1/34. 
4-pp. 



7902120003 DOCKET 90-441 Perry Nuclear Power Planti Unit 2 
Forwards IE Info Notice 79-01, "Bergen-Paterson Hydraul Ic 
Shock h Suiay Arrffatore (HB5A). 

KEPPLER, J. Q. Region 3, Chicago, Office of the Director. 

Ip. 



79O3B6023B DOCKET 50-413 Seabraak Muclesr atatlon, Unit 1 
Bummariiet 7B1213 meeting in Qetheada, HD.w/repreBBntatives 
of llt-ils w/poEt-CP applications to discuss pending OL 
r-evleu matter B, incl udlitg staff policies & rovlem prlorltij 
criteria. Discussion areas It attendees list end. 
LICITRAiE. L!j)ht Water Reactors Branch 3. 79/01/12. Bpp, 



124 



DOCKET SO-443 Seabrook Nuclear Station, Unit 1 

n,,,. " 9lan *' Philadelphia. Office nf the Director. 



DOCKETED ITEMS 



7902I3G02B DOCKET 30-443 Seabrool, Nuclear Station. Unit 1 

' -"-P-l.*.on Hud".uli c 

nuiaunc 

- "Me. of th. Director. 



c ' 

Suiag Arresters (HBSA) " 

' "*"* " '' ""'"' 



7902300303 DOCKET 30-443 S Ba bro a k H JC l ear Station, Unit 1 

For^rd* IE Bulletin 79-O1, "Environ Ou.llf icatinn of Class 
IE Eq.L.ipm.n^ ' H/1U* of 11 , U9 t e matic evaluation program 
plants for which no action is required 

IP R< "" 0n '' Phila <"P hii " "fflM of the Director. 



Ttasaacaai DOCKET SO-444 Seabrook Nuclear Station, Unit H 
Forwards Amend 3 to. CPPH-135 A 136 4 Federal Register 

BOVD.B. S. Division of Project Management. 79/O1/31. 4pp. 

77033B03aB DOCKET 50-444 Seabrook Nuclear Station, Unit 2 
Amend 2 to const permit CPPfi-133 t. Amend 2 to CPPfi-136, 
WholBBfllB t 'El ttl t''l fe c a f atune '' stlip interests to MA Municipal 
UQYD.R.S. Division at Project Management. 79/O1/31. 0pp. 

7902330061 DUCKET 50-444 Seabrook Nuclear Station. Unit 2 

foJln t f TBA ? a e pam P hlet 35O-3Q, "Inter service Procedures 
1* j.wfiIhJ! ? - *.? B !? ell * |l ' lllBnt ' 1 "^"nted in NUREQ-O319 
B?BM ,, , microfiche form from NHC. 

HEEAW, W. J. Division of Document Control. 70/11/20. 3pp. 

7902020093 DOCKET SO-444 Seabroo* Nucl.ar Station, Unit 2 

Fori/at-ds errata to NBC all B rnative stte akudy testimony. Upon 
r! ij I ' tate of ME statute.NHC concludes that statute 
couifl not be raise-d as ownership barrier, consequently 

Office of the Eicutlv Legal Director. 79/O1/03, 7 PP . 

7903020028 DOCKET SO--44 Seabrook Nuclear Station, Unit 3 
Forwards "Errata in Direct Testimony of the NRC Staff to 
replace errata mailed 79O103 
BRENNER.L. Office of the E.ecutive Leoal Director. 79/O1/10. Hpp. 

79023702!! DOCKET 30-444 Sesbrook H.clear Station, Unit 3 
fac?T"nc?usi ns ri of U !L re fUil *' f pr p " ed Mnllnp. of 
B notos r f Di j trict CoLj rt opinions. Foruards 2 eihlbits! 1 

.L. Office of the Executive Legal DirectoVSwoi /22. Spp. 

Ari 4+ i DOCKET 50-414 Seabrook Nuclear Station, Unit 3 
Drdinlnces as V Am Bt> a e flpl>1 icarlta ' Eihiblt 79-1 , "Revised 

DUFLO,H.E. Atomic S Q f*t,| and Licensing Appeal Panel. 79/O1/24. 



7902360233 DOCKET 50-144 S Ba br n 



. 

utils 



Station, Unit 3 



r v 

t-CP appljiatinn, to discuBs pending OL 

' i ^ uaiTto ataff f-l fc ^vieiprZorit,, 
5r'^ ia - 0i si:u5lon area, t, attendees list encl fTlarltv 

UKITRfl.E. Light Hater Reactors Branch 3. 79/O1/12. Spp. 



3 ** b ol Unclear Station. Unit 2 

Ma '- F " * ^u t ai AC 

' ""'P"'- <" the Dlr. c tar. 

Nuclear Station, Unit 2 

^r^n-Pater^n HdrluUc 
iis 

>l"'i- "fie- F t^ Directs. 



7902350503 DOCKET 50-444 S.ahrook Nuclear Station, Unit 2 

FMi IE Eulletin 79-01. "Environ 0.al""atl n of ?!. 
IE Equipment H/,i st B a n sy , tHBatic .vaf u ."on prw," 
plants far uihich no action is required Prooram 

lP. Re3i n '' P * 1Ia <""P"ia, Office o f th. Director. 



7^03130038 DOCKET 30-444 Seahrot 

sS'ZV I 1 f W "" "-"'- 
Shock (, Suay Arrestors (HSSA) 

Re9i0n '' Ph "- 



79030B0397 DOCKET SO-445 Corcanche Peak Stea m Electric Bta , Unit 1 
Summari; of 781023 meeting in Heth s<la,MD u/ technical 
revieuj*rs re plant review status, schedule (, site visit U/ 
encl list of attendees. 
NAWENTI.B. Light Hater Reactor. Dranch 4. 79/O1/17. '4^, 

7903030299 DOCKET 50-443 C Drafl nche Peak Steam Electric Bta., U.|. , 
Nat fication of 781023 meeting in Dethesda.MD U /techn"a 
revi.uierB to discu.a plant revieu .tatu., schedule (, mt l" 

NAVEHTI.R. Light Water Reactors Branch 4. 79/10/14. 1.. 

79020B03HO DOCKET 50-445 Co-nanche Peak Steam Electric Sta , Unit I 
Bum ma r of 7BI30S meeting in Dethe.da.MD re request for a id! 
info re QA program. M/llst of attendees 
NAVENT1.B. Light Hater Reactors Branch 4. 79/01/17. Spp. 

7903010373 DOCKET 50-445 Comanche Peak Steam Electric Sta , Unit L 
Informs of delay in prospective decision date for fuel 
loading to Apr 19B1. Caseload Forecast Panel to visit reactor- 
sit. on 790213-13 to develop independent estimate of f"l 
Rnvn n a = n? a y dS revi " d """tone date, for revleu. 
BDYD.R.B. Division of Project Management. 79/01/33. s pp . 



Unit 1 



3pp. 



n D ? C KET 50-445 Co ma nche Peak Steam Electric Sta.., 

Notifies util that application for operating licani I. 
accepted for full review. Forwards notice of aval labl litu 
e 2 I Bpt * notl f oppoptunita for hearing. 

.S. A. Light Mater Reactors Branch 4. 79/01/26. 



7902380413 DOCKET 50-445 Comanche PeaV Steam Electric fita. . Unit 
Notice of av.llablllt of applicants' environ rept, 
consideration of issuance of facility operating licen.es, ft 
SESnl ="!*" f r h " ri " "" applicants' request bu 79030B 
WFIOA.S.A. Light Hater Reactor. Branch 4. 79/01/26 . PF 



7903280423 DOCKET 50-443 Comanche Peak Ste. m Electric 

NRC ;?c.?' IP " Pt M lt V 01 ' l>UbIie P"*"=iP- Propsd 
NHC licensing action. 01 ves 30 day. after 790205 for public 

8 ; a hBarln 9 "cording to instructions oiven 

. A. Light Water Reactors Branch 4. 79/01/36. Sff, 



Unit 1 



-- -, 5 " 1 " Conl! "*' P"^ Steam Electric at... Unit 1 
Foruards Anne, L of State of TX Disa.ter Plan re 

implementaUnn, opuration, organisation & authority to carry 

out provisions of TX Disaster Act of 1979 

EDWARDS, J. D. Te.as Utilities Services, Inc. 79/01/29. 33pp. 



- Comanch. Peak 8t.. M Electric St... Unit , 
'; i E Qn "" t0 CDrB P"""-ne. Branch 
0a 31. 11,02321-0332.) re fu.l p.rfaruiic. 

J ? ^V "" ''transmitted to NRC in FSAR Amend 4. 
B.B. Te.as Utilities Service,, Inc. 79/01/31. 23pp. 



C manChB P " k St " m *-^ 
avs to Au I iliary Sgstems Branch 

"" 



"Forwards' 
r-orurardj 

c q oS: ii.- , - ' - -- 

code i seismic classification. Responses uill be 

retransmitted to NRC in FBAR Amend 4 

DACKO.D.S. Te, aH Utilities Service,, Inc. 79/01/31. 



1MU 1 



B2pp_ 



"Forwards nV" 4 " ^"""^ "" l St " m ""'"^ 
Forwards initial responses to Emergency Planninu Branch 

MoTo ! ( ?-aaaS) re emergency action l.vi" L 
radiolojical emergencu candition. Responses uiill be 
retransmitted ta NRC in FBAR Amend 4 
FEIST.C.K. Texas Utilities Services, Inc. 79/O1/31. 9&pp. 



rs ?nitf, S " 1 ' 15 CnmanChB P " 8*"" Electric St.., Unit 1 
orwars Initial responses to Seiimology-Oeoloait Branch 
questions (0361. 16-Q361. 24, Q362. 10-0362 22> re Info 

retr!^ 1 ??/^^ 5 ,,^ "U" n " r i*t. Response. W l 1 1 be 

retransmitted to NRC in FSAR Amend 4. 

FEIST.C.K. Te, as Utilities Services, Inc. 79/01/31. S6pp. 



WERNER.R. 



S ~ 44B CDm " che P "" Electric St.. . Unit 1 

" ">P""" *o NRC Round 1 questions on 
2""? 1 "" "" '*'*""*- in FBAR Amend 4. S.v.n 
es 3 " " " cl - Info "1""*- concern. ,vc spillua,, 
Te.as Utilities Services, Inc. 79/01/31. 41pp. 



-'" 5 C Q n,ancbe Peak Bt... Electric Sta., Unit 1 

"" 111 ?: tD e ">""nt Treatment Sys Branch 
O. B) re solidification process control 

LEOtUSS 1 F"I PM T* "" J? * 1 '""i"" *" NRC in FSAR Amend 4. 
LEONARD, E. J. Texas Utilities Services, Inc. 79/01/31. 33pp. 



DOCKETED ITEMS 



126 



7TO2Q50220 DOCKET 50-449 Conanche Peak Steam Electric Sta. , UnH 
Forwards Initial responses to Quality Assurance Branch 
Ruestions (0481. 1-O421. 42) re OA program. Responses mill be 
retransmitted to the NRC in FSAR in Amend 4. 
LEONARD, E-J. Tia Uti 1 itias Services, Inc. 79/O1/31. S4p.p, 



7903120Q46 DOCKET 50-445 aaroanctie Peak Steam Electric Sta. 4 Unit 1 
Notices of availability uf appl i cants ' environ rept. 
consideration of Issuance of licenses ti opportunity For 
hearing. 
VAHQrt. 3. A. Light Water Reactors Drancfi 4. 79/Ql/2i. 6pp. 



7702280176 DOCKET 90-445 Comanche Peak Steam Electric Bta. , Unit 1 
Notification of 790213 netting in Bethesda. HD to discuss 
first round questions from branch**. 
BUHWELL.S. B. Light Wtnr Reactors Branch 2. 79/02/05. 2pp. 

7908280184 DOCKET 30-449 Comanche Peak Steam Electric Sta. , Unit 1 
Notification of 79O337-2B meeting In Olen Rose, TX to 
evaluate const progress & assess fuel load date. Reschedul es 
790212-13 meeting. 
BURUELL.S. B. Light W*tar React on Branch 2. 79/02/Q5. 2pp. 

7902090170 DOCKET 3O-445 Comanche Peak Steam Electric Sta.. Unit 1 
Forwards environ rtpt (operating license stage) File 
10040. Affidavit encl. 
OARYiR.J. Teiai Utilities generating Co. 79/01/19. 2pp. 

7902090331 DOCKET 3O-443 Comanche Peak Steam Electric Sta.. Unit 1 
Submit m affidavit of svc of copies of environ rept. 
Distribution made ai directed by NRC 790109 Itr. 
8CHMIDT.H. C. Texas Utilities Generating Co. 79/01/30. 7pp. 

7902270319 DOCKET 3O-443 Comanche Peak Steam Electric Bta,. Unit 1 
Listi document! transmitted by 79Q119 Itr b referenced by 
environ mpt. 
OAHYiR.J. Teias Utilities Generating Co. 79/03/O9. 2pp. 

7902270321 DOCKET 90-449 Comanche Peak Steam Electric Bta., Unit 1 
"Environ Monitoring Program, " 197A. annual summaT-u. 
Teiam Utilities Generating Co. 79/12/31. 230pp. 

79O2270326 DOCKET 30-445 Comanchi Peak Steam Electric Sta., Unit 1 
"Environ Monitoring Program." 1973 annual summary. 

Teiaa Utilities uen*.ratlng Co. 73/112/31. 350pp, 

7902270331 DOCKET 30-443 Camanche Peak Steam Electric Sta., Unit 1 
"A Biological Ri-Eiajnination of Selected Sites in Late 
Oranbury,. TX. " submitted to TX Util Generating CD & prepared 
by Southern Methodist University. 

Texas Utilities Generating Co. 76/06/26. 23Opp. 



7902270337 DOCKET 30-449 Comanche Peak Steam Electric at a. , Unit 1 
"Final Rapt on an Environ Survey of Aquatic Ecosystem 
Affected by Canst of Proposed Conanche Peak Steam Electric 
Station. " 
* Teiai Utilities Oenerating Co. 74/12/3Q. 42Opp. 

7902270343 DOCKET SO-445 Conanche Peak Steam Electric Bta., Unit 1 
"Hopeuell School Bite, a Late Archaic Campsite In Central 
Briioi River Valley. " 
Teias Utilities Qenerating Co. 76/18/31. 131pp. 

7902270331 DOCKET 90-449 Comanche Peak Stean Electric Sta.. Unit 1 
"Dinosaur Track Discovery of Comanche Pea* Steam Electric 
Station! Sonet-veil County, TX." 
T>ai Utilities Generating Co. 79/OH/E7. 16pp. 



7902O1OI73 DOCKET 30-449 Comanche Peak Steam Electric Bta., Unit 
Foruard-s rovised list of recipients oF documentation copies. 
OARY.R. J. Teias Utilities Generating Co. 79/01/34. 2pp. 



7-?02120197 DOCKET 3O-A4'S Cnmancde Peal Stean 
Submits Amend 4 to FSAH. rtff idavi t encl. 
GARY, H. ,J Teiaa Utilities Oenerating CD. 



Electric Sta. 



2pp. 



79QE13Q19B DOCKET 5O-4il5 Comanche Peak Steam Electric Bin., Vnt 
Amend 4 tn FSAR. Includes changes to environ radiation 
monitoring, design criteria t nuclear steam supply sya. 
OAHV.R.J. Teias Utilities Oenerating Ci>. 77/OI/31. IQQOpp. 



7903310163 DOCKET SO-419 Comanchi! Peak Steam Electric Sta 
Forwards affidavit of svt to Amend 4 tn PSAR 
SCHMIDT, H.C. Teiiai Utilities Oenerating Co. 79/02/13. 



3pp. 



79Q20SQO37 DOCKET 30-445 Camanche Pea* Hteam Electric Bta,- Unit 1 
NRC initial interrogatories ti rcq.uests fur production af 
documents propounded to Houston Lighting ft Power Co ti TX 
Util Oenrating Co In antitrust proc eedlng. Certi Flcate of 
Eve encl. 

LEBSY.R.P., BLUME.M.D. Dffico of the Enetutlve Legal Director. 
79/O1/I5. a7pp. 

79020A0130 DOCKET 50-443 Camanche Peak Steam Electric Bta., Unit I 
Motion by Central Pouar (. Lioht Bitonsicin oP time until 
79032O uiitliin tvhich to jnsuer Interrogator 1 as ( producu 
documents. H/Certlf icatn of tivc. 
RYAN- T. O. laham, Lincoln & Deale, 7?/Ol/17. 7pp. 

7902060134 DOCKET 30-443 Comanche Peak Btuam Electric Bta.. Unit I 
Application for issuance of mbpotna^. M/f ivo draft subpoenas 
for di posit ion Et five sitbpoDnas for produclipn of Joe umantn 
re general iscue of CDrnpetltion In electric util Induttrg.H/ 
Certificate of Svc . 
RYAN.T.Q, I sham, Lincoln & Beale. Jfl/Ol/lQ. 5?np. 

7*?02210096 DDCKET 50-44B Comanche Pan* Steam Electric Sta.. Unit 1 
Motion For eitctiliqn until 7902OA in uihlcJi tp File reipontfr 
to objections 1< to (notions for protective orders to compel 
production re City of Austin's responses. H/Cert i f icatv of 
Bvc encl. 
PARMENTEn.F. II. Justice, nejt. of. 77/0 1/33. 7pp. 

79O2030O34 DDCKET 30-4H3 Comancho PBak Btean Electric nta, . Unit I 
TX Utii Generating) Co motion For intension of time until 
790309 to file answers or ub j ect 1 one, produc p documents or 
otherwise plead. Certific.ibo of Svc encl 
KNOTTS, J, D. Bebevoiso b Lieborman, 77/01/29, 4pn. 

770H1H0042 DOCKET 30-443 Comanche Peak Btean. Electric Sta. , Unit 1 
Houston Lighting fc Pouier Cd motion for eitenslon of time to 
respond or object to. HRC InlerroDntorloi ilue to Bitensive 
investigation required. Certificate of Svc encl. 

FRAHKLINiH, J. Louirnstoin. Neumnn. llvis. Ai elrad & Toll. 79/01/30 
3pp. 



790Z23O189 DOCKET 90-449 Comanche Peak Steam Electric Bta. , Un 
Responds to NRC request for revleu tc comment on facility 
environ rep>t. Commends util on effort to Identify historical 
sites & landmarks. Suggests rept be submitted for comment to 
T Latimer of TX Historical Commission. 
HANDLEY.fi. B. Interior. Dept. of. 79/02/19. ip. 



7908330049 DOCKET SO-443 Comanchi? Peak Steam Eloctrlc Sta.. Unit 1 
Hept on proarcso of distovHry during Jan 1977 punirant to 
ASLB 7QO621 order. Informs of primary process of revising 
rnatl received. Certificate op Svc end. 

HARRIS. 0". L. , CLARK, R, 4. , PARME^TGfij F, H. Justice. Deot of 
79/01/30. 7pp. 



7902230O&1 DOCKET 30-443 Comanche Peak Steam Electric Bta., Unit 1 
Inform* that TFWDDC Pamphlet 330-30-. "Intorservice Procedures 
for Instructional Sys Ovvel gpment" referenced in NUREQ-Q219 
ll available In microfiche form from NRC. 
IESAH.M.J. Division of Document Control. 7B/11/30. 3jip. 

7902090293 D-OCKET SO-445 ComanchB Poak Steam Electric Sta. i Unit 1 
Informs that 7S1223 request to intervene by NH Jacabson is 
prematurei because no notice of opportunity fpr hearing has 
teen published in Federal Register. 
REYNOLDS. N. 3. Debevolae & Liebernan. 79/01/11. Ip. 

7902120041 DOCKET 3D-445 Comanche Peak Steam Electric Sta., Unit 1 
Application* fur operating licenses have been accepted for 
full review. Forwards Federal Register notices. 
VAROA, B. A. Light Hater Reactors Branch 4. 79/Q1/24. 3pp. 



79020&0333 DOCKET 3O-14& Conanche Poak Steam Electric Sta., Unit 1 
Grants extensions of time ,to utila to respond to iliscuverij 
requests tt to Justice Hep t to respond to objections t. 
motions For protective orders. 
NILLERi M. E. Atomic Sflfetif and -Llcensins Board Panol 79/01/31 

app. 



7902140243 DOCKET 5O-145 Comanche Peak Steam EJnetric Sta. , 
Opposes i n tr as ta to-only operating provisions of 
participation in faci 11 tlnu. duo to adverse effect on 
interregional pouter supply !< options dealgneri to deci-oasc 
charge for elec trie i t. 
PFEFFER. J.L. Energy, Kept. of. 79/01/31. 3pp. 



Unit 1 



126 



DOCKETED ITEMS 



7902310057 DOCKET 50-443 Conanche Peal Steam Electric Sta.. Unit 
Advise* of discovery status t, forwards opinion of US 
District Court in related antitrust trial in uihlcfi tun TX 
intrastate utils sued tuo other TK introstate uti Is. al leg ing 
antitrust conspiracy 

LES5Y,R.P., BLUME.N B. Office of the Executive Legal Director. 
77/02/02. 3pp. 



7902270233 DOCKET 80-449 Comancho Peak Steam Electric Bta. , Unit 1 
Supplements 790117 verbal rept re possible deficiency in 
installing pipe elbouiE connecting steam generators to cron- 
leg p In Ing. Cone ludas matter in not repartab lo. under 
10CFRSO. 95(e). 
OARV.R.J. Texas Utilities Qeneratino Co. 79/02/HQ, lp, 



7903230080 DOCKET 50-445 Corrtanche Peak ateam Electric Sta., Unit 1 
TX Utils Generating Co rept on discovery during Jan 1979 per 
AELB request. Inforns of receipt of NpC interrogatories !< 
answer to DDJ request. Certificate of Svc end. 
KNOTTS.J.B. Deoevoise t Lieberman. 79/03/02. 3pp. 



7902090132 DOCKET 30-446 Comanche Peak Steam Electric Sta, , Unit 8 
Forwards initial responses to Seismology-Geology Branch 
questions (0361. 16-0361. 24- 0363. 10-0362. BS) re infa 
concerning status of wells near site. Responses will be 
retransmitted to NRC in FSAR Amend 4. 
FEIBT.C.K. Texas Utilities Services. Inc. 79/01/31. 5App, 



7902230267 DOCKET 50-445 Comanche Peak Steam Electric Sta,, 
DOJ's response to TX Uti 1 Generating CD'S objections tc 
motions for protective orders re EOJ's 790112 discovery 
request. Urgos A9LD to overrule objections ft deny motions. 
Certificate of Svc end. 

HARBIS.J.L.. CLARK, R. H. . PARMENTER, F. H. Justice. Dcpt i 
79/02/06. 24pp. 



7903220273 DOCKET 50-445 Comanche Peat Steam Electric Sta., Unit 1 
Motion to compel TX Util Generating Co to provide further 
responses to DOJ 7B1132 discovery request due to 
insufficiency of 790112 answers. Certi ficate of Svc end. 
HARRIS, J. L. , CLARK, R.H.. PARMENTER. F. H. Justice, Deot of 
77/02/04. 14pp. 

7-J02230051 DOCKET 30-443 Comanche PeaM Steam Electric Sta., Unit 1 
Motion to compel Houston Power b Light to provide further 
responses to DOJ 7B1133 discovery request due to 
Insufficiency of 790111 answers. Certificate of Svc end 
HARHIS.J.L., CLARK, R. H. , PARMENTER, F. H, Justice. Dapt of 



79QE260230 DOCKET 50-445 Comanche Peal Steam Electric 8ta 
Motion to compel city of Austin, TX to provide fuller 
responses to DDJ 701130 discovery request because of 
insufficiency of 790113 answers. Certi f Icate of Bvc encl 
HARRIS.J.L.. CLASH, R.H.. PARKENTER, F,. H. Justice. Dept 



of. 



7902230034 DOCKET 50-445 Comanche Peak Steam Electric Sta,, Unit 1 
Houston Lightinj t, Pouer CD'S second, set of interrogatories 
& requests for production of documents to DOJ, Anti trust Div 
Certificate of Svc encl. 
FRANKLIN, H. J. Baker & Batti. 79/02/09. 7pp. 

7903230039 DOCKET SO-4 Comanche Peak Steam Electric Sta., Unit 1 
Houston Lighting h Pouier Co's second set of interrogatories 
t revests for production of documents to NRC. Certificate of 
DVC encl. 
FRANKLIN, U J. Baker (, Dotts. 79/02/09. 7pp. 



7TC2aB01 DOCKET 30-443 Cooanrhe Peak Ste 



"79^5. 



Electric 5ta , Unit 1 



- * Engineering 



79022Q0166 DOCKET 50-445 Corcanche Peak Stean Electric Sta 
IE Insp Repts 50-448/70-23 J, 50-446/73-33 on 7B131B-20 M 
noncompl ance noted. Major areas inspected: const activities 

' 



Unit I 



7pp . 



6EVF(JIT,K.V. 



Arrester 



o l onth a t"' 1 " ^"^ Peflh Steflm E1 tric Sta., Unit 1 
no reoortab.i ! el Pn 3 ipn joint decontamination room is 
OARV B i T .,;?? d -''neg under 10CFR50. 35. 
QARY.R.J. Te, as Utilities Generating Cn. 79/03/06. lp. 



^ 

.i::s:: P 'i'.r;;pri: 1111 ' 1 CDnnectina st - m 

GARV.R.J. Te.as UtilU, BS Generating Co. 79/03/13 lp 



7902.080297 DOCKET 50-446 Comanche Peak Stnam Electric Sta., Unit & 
Summary of 7Q1023 meeting in DothBtida.MD ui/bechniol 
reviewers re plant raviouj status, schedule ti tltn visit. W/ 
encl list of attendees. 
NAVENTI.fi. Light Water Reactors Branch 4. 79/01/17. 1pp. 

79020B0299 DOCKET 50-446 Comancho Poat Steam Electric Qkt, . Unit 3 
Notification of 70 1033 meeting in Dfltheida.MD u/technlc^l 
reviewers to discuss plant revieui status, schoitulft fc slt 
visits. 
NAVENTI.R. Light Water Reactors Dranth 1. 7B/10/16. lp. 

79020B0320 DOCKET 50-446 Comanche Peak Steam Electric SU. , Unit B 
Summary of 781205 meeting in Detlieada, HD ro request for adril 
info re QA program. W/liot of attendees. 
NAVENTI.R. Light Water Reactor* Dranch 4. 79/01/17. Bpp. 

7902010273 DOCKET 30-416 Comanche Peak Steam Electric Bta. , Unit S 
Inform* of delay in prospective decision dat for Fuel 
loading to Apr 1981. Cosel oad Forecast Panol to visit reactor 
ite on 790212-13 to develop indepondant estimate of fuI 
load date. Foruorda reviBed milestone dates tar rovleoj. 
QOYD.R.B. Divinion of Project Management. 79/01/23. 3pp. 

7902B90407 DOCKET 50-446 Comanche Peak Steam Electric Sta. . Unit 3 
Notifies uttl that application for operating llconses Is 
accepted for full review. Forwards notice of aval lab i 1 1 ty of 
environ rnpt t. notice of opportunity for hearing. 
VARCA.a.A, Light Water Reactors Dranch 4. 79/01/26. 3pp. 

79022Q0412 DOCKET 5O-446 Comanche Pea* Steam Electric Qto, , Unit S 
Notice of availability of applicants' environ rept. 
consideration of issuance of facility operating llcansei. & 
opportunity for hearing on applicants' request by 790303. 
VARGA.B. A. Lioht Water Roactovs Brunch 4. 79/O1/36. lip p. 

79022B0433 DOCKET 50-446 'Comanch* Peak Steam Electric Sta,, Unit S 
Notice of opportunity for puolic part i n i pation in proposed 
NRC licensing action. Olvos 30 days actor 790303 for public 
to request a hearing according to instructions given. 
VAROA, 8. A. Light Hater Reactors Branch 4. 79/01/S6. Hpp. 

7902050221 DOCKET 50-146 Comanche Peal Steam Electric Hta. , Unit 3 
Forwards Annex L op State of TX Disaster Plan re 
implementation, operation, organimtion & authority to carry 
out provisions of TX Disaster Act of 1978. 
EDWARDS, J. 0, Toias Utilities Services. Inc. 79/01/H9. 3Hpp, 

7903050099 DOCKET 50-446 Comancho Peak Steam Electric Bta, , Unit 3 
Forwards initial responses to Core Performance Drnnch 
questions (0231. 1-0231. ti, 0232. 1-0232. t re fuel performance 
S!n Bp n " B u111 be "transmitted t NRC In F8AR Amenil 4. 
DACKO.D.S. Toas Utilities Bervlcos, Inc.. 79/01/31. 33pp. 

7902050125 DOCKET 30-446 Comanche Peak Steam Electric Sta., Unit 3 
Forwards initial responses to Auxiliary Systems Dranch 
questions 10003. 1-Q003. 3, Q010. 2, 0010. 4-0010. 19) re comj.on.nl 
code & seismic c lassl fi cation. Responses will uo 
retransmitted to NHC in FSAR Amend 1. 
DACKO.D.B. Te, as Utilities Servicos, Inc. 79/01/31. 52pp. 



7902050130 DOCKET 50-446 Comanche Peak Steam Electric Sta., 
Forwards initial responses to Emergency Planning Dranch 
quest on, (0433. 1-0432.23) re emergency action levels Por 
raaiolnglcal emergency cond i tion. RenponseD will fao 
retransmitted to NRC in FSAR Amend 1 
FEIST.C.K. Teias Utilities Services, Inc. 79/01/31. 94pp. 



OARY.R.J. T.M, Utilities Generating Co. 79/02/19. lp. 



Unit 3 



n-n J1CKET B0-i Comanche Peak Steam Electric Bta., Unit 2 
Forwards initial responses to NRC Round 1 question, on 
hydrology. Responses be retransmitted in FSAR Amend 4. Seven 
caplbmtus 9S mel - In ' T W*la concern, .v c o?ilI2. 
HERNEfi.H. Te<as Utilities Services, l n . 79/01/31. 41pp. 



DOCKETED ITEMS 



127 



79OSO9D18B DOCKET S0-44i Comanche Peak Steam Electric Bta. , Unit a 
Forwards initial response tg Effluent Treatment By a Branch 
quest! on, (0320, 9) re solidification process control 
program. Response mill be transmitted to NRG in FSAR Am and 4 
LEONARD, E. J, Tofls Utilities Service*, Inc. 79/01/31. 35pp. 

790SQJQBSO DOCKET 30-44& Cnrtianche Peak Steam Electric Sta. , Unit 2 
Forward! Initial responses to Quality Assurance Branch 
questions (0431. 1-Q421 . HE) re QA proaram. Re sponses mill be 
retransmitted to the NRC in FSAR in Amend 4. 
LEONARD, E. J. Tuna* Utilities Services, Inc. 79/01/31. 34pp. 



770S38017& DOCKET 30-44A Comanche Peak Steam Electric Bta. , 
Notification of 790213 melting in Dethesda. MD to dlscusa 
first round rjueitions from branches, 
HURHELL, S. D. Light Water Reactors Branch 2. 79/Q2/O5. 



2pp. 



79O22B01B4 DOCKET 50-44i Comanehe Peak BtBam Electric Sta., Unit 2 
Notification of 790327-aa meeting In Glen Rose, TX tq 
evaluate const progress & assess fuel load date. Reschedu lea 
790213-13 meeting. 
BURWELL, 8. B. Light Water Reactors Branch 3. 79/O2/OS, 2pp. 

790H09O170 DOCKET 90-446 Comanche Peak Steam Electric Bta, , Unit S 
For ward i environ rept (operating license stage) file 
10040. Affidavit encl. 
OARY.H. J. Tens Utilities Generating Co. 79/01/19. 2pp. 

7902090331 DOCKET 30-44& Comanche Peak Bteam Electric Sta., Unit S 
Submits affidavit of svc of copies of environ rept. 
Distribution mad* as dlracted by NRC 790109 Itr. 
SCHMIDT, H. C. Texas Utilities OeneratinB Co, 79/01/30. 7pp. 

79OS870319 DOCKET 30-44i Co-manche Peak Bteam Electric Sta., Unit 2 
List* documents transmitted hy 790119 Itr b referenced by 
environ rept. 
OARYiR, J. Teias Utilities Generating Co. '79/02/09. 2pp. 

7902270321 DOCKET 30-446 Comancha Peak Steam Electric Sta,! Unit 
"Environ Monitoring Program. " 1976 annual summary. 
# Tei Utilities Senaratlns Co. 79/12/31. 220pp. 



7902120041 DOCKET 50-446 Comanche Peak Steam Electric Sta , Unit 2 
Applications for operating licenses have boon accopted for 
full review Forwards Federal Register notices 
VARCAiE.A Light Hater- Reactors Branch 4. 79/-01/26. 3pp. 

7902120046 DOCKET 50-446 Comanthe- Peak Steam Electric Sta , Unit 
Noticc-s of availability of applicants' environ rept, 
consideration of issuance oF licenses I: opportunity for 
hearing. 
VARGA, S. ft Light Mater Reactors Branch 4. 79/01/24. App. 

7902010173 DUCKET 50-416 Comanrho Peal Steam Electric Sta , Unit 3 
Forwards revitDd list of retipipntg of documentation copies 
GARV,R. J, Teiaa Utilities Generating Co 79/01/24 2pp. 

7902130177 DOCKET 50-44i Comanche Peak Stearo Electric Sta . Unit 2 
Submits Amend 4 to FSrtFl. Af f idavi t encl 
GARY.R. J. Teias Utilities Generating Co. 79/01/31. 2pp 

7902120199 DOCKET 5O-44o Comanche Peak Steam Electric 3ta. , Unit i 
Amend 1 to F5AFI Includes changes to environ radiation 
moni taring, design criteria ?i nuclear steam supply *y. 
OARV. R. J. Teias Utilities Generating Co. 79/01/31. lOOOpp. 

79022-10162 DOCKET 50-44i Comanche P*afc Bteam Eloctric Sta , Unit 2 
Forwards affidavit of svc to Amend 4 to FSAR. 
SCHMIDT, H. C. Teias Utilities Generating Co. 79/O2/13. 3pp. 

7902050037 DOCKET 50-44& Comanche Peak Steam Electric Sta., Unit 2 
NRC initial interrogatories !r request! for produc tion of 
documents propounded to Houston Lighting t< Power Co 1. TX 
Util Generating Co in antitrust proceed ing. Cert i f i ca te nf 
Bvc encl, 

LESBY.R.P., DLUME.M.D. Office of the Eiocutive Legal Director. 
79/01/1S. 37pp. 

7902O601SO DOCKET 30-446 Comanthe Peak Btearn Eloitric Sta., Unit 3 
Motion hy Central Pouer li Light eitension of time until 
79O230 ulthin uhlch to answer interroga tor i e-s It produce 
documents. M/Cert if i tato of Bvc 
RVAN.T.Q. laham, Lincoln. !, Desle. 79/01/17. 7pp. 



7903270326 DOCKET 50-446 Comanche Peak Steam Electric Sta., Unit 3 
"Environ Monitoring Program," 1975 annual summary, 

* Texas Utilities generating Co. 73/15/31. 350pp. 

79O2B7O331 DOCKET 30-446 Comanche- Peak Steam Electric Bta., Unit 2 
"A Biological Re-Examination of Be lee tod Sites in Lake 
Oranburu. TX. " submitted to TX Util Generating Co h prepared 
fig Southern Methodist University. 

* Texas Utilities venerating Co. 76/06/36. 230pp. 

79O2Z7O337 DOCKET 50-444 Comanche Peak Bteam Electric Bta. , Unit 2 
"Final Rept an an Environ Burveij of Aquatic Ecosystem 
Affeetad by Const of Proposed Comanche Peak Steam Electric 
Station. " 
Tx* Utilities Generating Co, 74/12/30. 420pp, 

7908a70343 DOCKET 30-416 Comanche Peak Steam Electric Sta., Unit 2 
"Hopoeuell School Bite, a Late Archaic* Camps ite in Central 
Braiai River Valley " 

* Toiai Utilities Generating Co. 76/13/31. 131pp. 

79O227Q331 DOCKET 30-446 Comanche Peak Steam Electric Sta., Unit 2 
"Dinosaur Track Discovery of Comanche Peak Steam Electric 
Station, Somervell County, TX. " 

* Texas Utilities Generating Co. 79/03/27, 16pp. 



7903060134 DOCKET 30-446 Comanche Peak Steam Eloctric Sta. , Unit S 
Application for issuance of subpoenas M/fivc draft lubpoenai 
for deposition tt Five subpoenas FOP production of documents 
re general istue of compe ti t i an in electric util industry. W/ 
Cartificate of Svc . 
HVAN,T. 0. iB.ham, Lincoln (, Reale. 79/01/13. 52pp. 

7902.210096 DOCKET 90-446 Comancho Peak Steam Electric Sta.'. Unit S 
Motion For eitenclon until 790206 In uihich to file- response 
to objections (c to notions for protective orders to compe] 
production re City of Austin's re sponso s, W/Cerll f i cate of 
Bvc end. 
PAnMENTER.F. H. Justice, Dept. of. 79/01/H&. 7pp. 

7902030034 DOCKET 30-446 Comanche' f'eali Steam electric Bta. , Unit H 
TX Util Generating Co motion for eitenaion of time until 
79O305 to file ansmera or ob jec ti ona. pr oduc e documents c.r 
otherwise p ] end. Cert 1 Pica to of Jive one I 
KNDTT6. J. 0, Dcbevoiac- !, Lieberman. 79/01/27 4pp. 

79021SC042 DOCKET 90-146 Comanche Peak St oam El ectr i c SU, , Unit a 
Motion hy util for c-iteneian of time to respond or object to 
NRC interrogator 1 ea due to oitenaive invest i gotion required. 
Certificate of Bvc encl, 

FRANKLIN. U. J. Lnuens tp in, Meuman, Re I s. Aie-lrad !. Toll. 79/01/30 
3pp. 



790S2301BS DOCKET 5O-446 Camanche Peak Steam Electric Sta. . Ui 
Riiponds to NRC request for review d comment on facility 
tnviran rept. Commends util on effort to identify historical 
sites h landmarks. Suggests rept be submitted for commont to 
T Litimir of TX Historical Commission. 
HAMDLEV, R. Q. Interior, Dept. of. 79/03/13. lp. 



790233004S DOCKET 3G-446 Comanclic Peak Steam Electric Sta., Unit E 
Rept on progress of discovery during Jan 1979 pursuant to 
ABLD 7B0621 order. I nf orms OF primary process nf reviewing 
matl veceivod. Certi Flcate of Svc ent 1 

HAFIRIB.J.L., CLARK, H. H. , PAFJMEMTEH, F. H. Justice, Dept. of. 
79/O1/3D. 7pp. 



7902330O61 DOCKET 90-446 Comanche Peak Steasn Electric Sta., Unit 3 
Inform* that TRADdC Pamphlet 330-30, "Interaorvice Procedures 
for Instructional Syi Development" referenced in NUREG-0219 
li available in microfiche form from NRC. 
EE9AW-W. J, Divitlon of Document Control. 78/11/20. 3pp. 

770209O29H DOCKET SO-446 Comancho Peak Steam Electric Sta., Unit 2 
Inform* that 781233 request to intervene by NH Jacobaar in 
premature, because no notice of opportunity for hearing has 
ben publiBhod in Federal Register. 
REVNOLDB, N. S. Debevoina EC Lieberman. 79^01/11. lp. 



7903060393 DOCKET 3O-446 ComanchB Peal. Steam Electric Sta , Unit 
Grants extensions of tine to utlls to respond to diEcovery 
roq,ueats K to Justice Oep t to respond to objections tc 
motions for jirotnctive orders. 

MILLEfl.M. E, Atomic Safotg arid Licensing Hoard Panel. 79/01/31, 
2pp. 

7902140245 DOCKET 90-446 Comanthe Peak Btoarn Electric Sta., Unit 
Opposes intrastate-only operating provisions, of 
participation in Pac i 1 i ti SB, due to adverse eFfect on 
interregional pouier supply tt options designe'd to decrease 
charge for electricity. 
PFEFFER, J, L. Energy, Dep t. DP. 79/01/31. 2pp. 



12S 



Pflak at.. El.ctrir Sta , Unit 2 

a 



7902210057 DOCKET 30-446 Comatic 
Advises of discovery status t, 

District Court in related ai.ni... i ^~-"T" "' *"' 

Intrastate utils suedtuo otfr T* t ln ^ T * 

antitrust consoiram * r 'ntrastatB utils.alleg 

LESSV.ff p 
79/02/03. 

KNOTTS.J. D. Debevoi 5 e , Lit-aerman. 79/02/02. 5pp. 



DOCKETED ITEMS 












fl d 



. 

o DQJ 731130 discovery P.qu 



FRANKLIN.H.J. Jlater i Dotts. 79/O3/09. 7pp. 



FftANKLlW, W, 0. Ddke,- (, Botts. 79/O2/09. 7 PP . 



ance not H d. 






7P , 



ors IHE5A) 



(JAUY.R.J. Te.as Utilities Generating Co. 79/03/30. Ip. 

7902230059 DOCKET STN-50-447 SEBSAR-338 

" PaBt S < rain Contpo1 flod Qualification 

Itr^ \r\?' Uithhal <' '"' "CF M n 7 TO 
Standardiiation Branch. 79/02/13. 3pp. 

7902230063 DOCKET STN-SO-447 GESSAR-23B 

3;:;:;^2;r^r < !^^;-:;,=--;j!-r'" 

" ma " e U " thheld ( " f 10CFR2. 790). 

Standardization Branch. 79/O3/12. 3 pp. 



ation. Unit 
" 



7902230061 DOCKET 5O-448 DougU. Point Nucl B 
SrJ%*'"J- A ? tIC P P hl ' 35 - 30 ' "Int." 

r.nib;r? i ""^"r 11 ; 11 "" 1 *" "''"' 

n=o?M ,. , microficJie form from NRC. 

GESAM.W. J. Division of Documant Control. 7B/11/30. 3pp. 



illhl ? * " i J ?7'" >P "' nt ' Bf '"''"'"f '" NUHEG-OS19 
., , " microf ^hB form from NRC. 

.W.J. Division of Documunt Control. 78/11/20. 3pp. 



" 449 DQU9laS Point NuclB " Cation, Unit 2 
dru* . PBB.toM.. t, r E q UeB t S Por production of 

documents propounded to Houston Ll B htln a t, Pouer Co fc TX 
""""" '" antitrust Pr..-in B .c.rtim.J. of 

LESBV.R.P. Office of th e E< e cut ivB L Bfla i Director. 79/01/13. S7pp. 

7902230066 DOCKET 30-434 Bron Station, Unit 1 

r" r i*.S^;', d i d i' tPi6 ? tUn Hsts far " lant ' s " 

ur;ro/?n;;ut:ir' " pi- " thoae sant as i * 

SLATER, M. Envlronmontal Project Dranch 1. 79/01/29. flpp. 

7902220033 DOCKET BO-434 Byron Station, Unit 1 

a 1 Sta * tna that "i-fibution f " 



NAUSHTQN. W, P. Commonuieal th Edison Co, 79/02/13. Ip. 

7903230061 DOCKET 30-454 Byron Station, Unit 1 

or":: t uctionTfi "T"?* 35 -^ "'"^rs.rvice Proc.dur.. 
is aiaillhl- ( \ y ? B ^ 10pm0nt; '"'"'iie.d in NUREO-OH19 
, J microfiche form from NRC. 

J. Diviiion of Dn tunlfl nt Control. 70/11/80. 3pp. 

79020903BO DOCKET 50-^94 Dgron Station. Unit 1 

?.m an.rH l"!*"^' 1 - Cr " k ' L * A Wfl ' 5h * 'nt.rv.ht. 
Pet tiuners cJairc they mill be adversely affuctud bu 

of Bvc C ! n " P81 '"" * dl h ""- ""ration. I. Certificate 
QOfiDDN.T. Waaler, Evans hflordon. BOCK, C. A. Dock.C.E. 79/01/13. 

79020B037S DOCK ET 50-451 Byron Station, Unit 1 

LS P HV f i;*"? 1 ^ 11 :'?* af L1 "" s *"9 0ard in proc^ding. 

LAZO.R. M. Atomic Safety and Li Cena in fl Board Panel. 79/OI/M. 3pp. 

7902150436 DOCKET BO-434 By rnn Station, Unit 1 

ueil s answer to petition to intervene filed bg M Westerman 

' ! -u.'; ^r;:r^.;d;' F 



. 



. 

ors to crnssover leg piping ""am 

J. T E , as UtlUti., Generating Co. 79/02/13. lp . 



790BWOS37 DOCKET 9O-M6 Coo.ncb. P eali St^-n Gl^ctrir St a 

Ki-SIiriS"""-^^ 

GARY,R.J. Te.ai Utilities generating Co. 79/02/19. lp. 



7702130073 DOCKET 50-494 Dyron Station. Unit 1 

Bdb wHTS!! ^ nla! , of Petition, to intervene submitted by 
Ar AM I! J 1 '^'" 1 " D f " Qmen VDters Df Rpchford.Defcal 

" ppbE " * Bi ^- 



". Lincoln (, Deal,. 



"wot? 0139 DaCKET 3 " 4E "' Qgran statl0 "' Unit 1 
Unit a HRC Certiff c P t ara f C B f K Karrlan & RJ Ooddard on behalf of 

til KlW1AN ' "- mcc oi= tne^E'xecutive Legal Director. 79/01/39. lp. 



DOCKETED ITEMS 



7908220137 DOCKET 30-434 Bgron Station, Unit 1 

Ansuer in opposition to M Westerman's petition to intervene, 
Pitltion fail! to tatisfg interest requirement & does nob 
include contentions. Certl ficite of 3vc encl. 
KARMAN,M. Office of the Eiecutive Legal Director. 79/01/29. 



4pp. 



79O227O252 DOCKET 5O--454 Dijron Station. Unit 1 

Forwards IE Info Notice 79-O3. "Limitorque Valve Scared 
Limit Suit-ch Lubricant " 

KEPPLEFi, J. G. Region 3, Chicago. Office of the Director. 

IP 



129 



790226QS94 DOCKET 5O-454 Bgron Station, Unit 1 

Answers DeKalb Area Alliance For Responsible Energy petition 

to intervene. Stand ing requirement satlsf i ed. sub j to 

author i ution for MJ Shineflug to act on their behalf. 

Contentions must be f i led. Certificate of Svc encl. 

KARMANiM. Office of the Eiecutive Legal Director. 77/01/29. 4[>p. 



79Q2S30186 DOCKET 3O-454 Bgron Station, Unit 1 
Foruardi 1978 Annual Kept for utility. 
BRE8EMANN, R. H. Commonuiea 1 th Edison Co 79/02/13. 



Ip. 



7902aB006fe DOCKET 50155 Pijron Station, Unit 2 

Forwards updated distribution lists for pla-nt 's environ 
reoto & amonds. Lists replace those sent as encl tn 761101 
Itr from PM Kreutier. 
SLATER, h 1 . Environmental Project Drench 1. 79/01/33. 8pp. 

7902220033 DOCKET 50-455 Byron Station, Unit 3 

Forward! affidavit stating that distribution of environ 
rept. operat ing license stage, has been made in accordance 
ui/NRC 7B1O20 Itr 
NAUGHTON, W. F. Commonwealth Edison Co. 79/02/13. Ip. 



7902230194 DOCKET 30-434 Duron Station, Unit I 

1978 Annual flept, Reviews 197B, five year summary of 

operations b mgt, ti flnanical statement. 

Commonwealth Edison Co. 70/12/31. S4pp. 



7902140078 DOCKET 30-454 Buron Station. Unit 1 

Forward* Amend IB to application for const permits !t 
operating licenses, m/r BBponses to KRC questions raised 
during FBAR acceptance review. Lists HUBS t ions unanswered due 
to time limit. 
REED. C. Commonweal th Ed i son Co. 79/Q2/OQ, 2pp. 

79021400S6 DOCKET BO-434 Byron Station, Unit 1 

Amtnd IB to F5AR. Inc lud is responses to NRC questions raised 

during FSAFl acceptance Tevlou. 

Commonwealth Edison Co. 79/01/31. 730pp. 

7903230166 DOCKET SO-4S4 Huron Station, Unit | 

Forwards affidavit required bg 10CFR2. 101 <a > (4) stating 
that Amend 18 to FSAFl has been di Btribute<d in accordance 
ulth 781020 Itr, 
NAUOHTON, W. F. Commonweal th Edison Co. 79/03/14. 2pp. 

7902140090 DOCKET 30-494 Dyron Station, Unit 1 

Forwards IE Insp Repts SO-434/7B-09 & 30-435/70-09 on 
7B1031-1 102i notico of violation & notice of deviation, 
HEI8HMAN, R. F. Region 3, Chicago, Reactor Construction & 

Engineering Support Branch. 7B/12/BB, 2pp. 

7902140093 DOCKET 50-434 Dgron Station, Unit 1 
Notice of violation from insp on 701031-1103. 
* Region 3, Chica-go, Office of the Director. 7B/1S/I5. Ip. 



7902230061 DOCKET 50-159 Byron Station, Unit 2 

Informs that TF1ADDC Pamphlet 350-3O, " I nterservi c ( Procedures 
for Instructional Sys Devol tipmont " reforencod in NUREG-OH19 
is available in microfiche form from NFIC. 
BESftW.U.U. Division of Document Control. 7B/1I/2O. 3fl p . 

7902090330 DOCKET SO-43S Ogron Station, Unit 2 

Petition bu P Neliier.L Crock, L I, fi Ualsh to intervene. 

Petitioners claim thai) will be ml ver'se-lij affected bi) 

radioactive releasoa t< ti i sc harocs. f F i rmat i ons tc CcrtiPicate 

of Svc encl. 

GORDON, T. Waaler. Evans & Gordon DOCK, C. A. Hack. C E, 79/O1/1 

17pp. 

79O2090273 DOCHtT 30-t5B Durcn Station, Unit 2 

Informs of ea tabl i shment of Lite-rising Hoard in protending. 

LAZQ, R. M. Atomic Safotg and Lirensing Board Patiol. 79/01/23, a 

79O21BO436 DOCKET SO-4S5 Bijriin Station- Unit 2 

Util'a ansuior to petition to intervene- Piled bi| M Wtstnrman. 
Opposes petition on groifnos oF failurir to eatalillah itanding 
!< Failure to spec i Pij proper sub j for c-vld en tlarij hearing. 
.Notices -of appearance ti Certificate of Sv-c enel, 

MILLER, M.!., MURPHY, P. M. , D lELftHBKI. A. P. Istiam, Lincoln 6 Dual*. 
79/01/2S I4pp. 

7^03130073 DOCKET 5O-49S Byron Station, Unit 2 

Uti 1 urflea. denial of putitions to intervene submitted by 

Dob Meiner Farms. League of Women Votcre of F<oc k f ord, O^halb 

Area Allianco for RuEponnible Ene-rgij !< Sinnissippi Alliance 

for Environ Certificate of Svc Duel. 

UIELAWHKI, A. P. , MILLER, M.I,, MUHPHV, i>. M. Uhnffl, Lincoln !. DenU 

79/01/39. 16pp. 



7702140098 DOCKET 30-494 Dyron Station, Unit 1 
Notice of deviation from Insp on 781031-1102. 
* Region 3i Chicaflo, Office of the Director. 



2pp. 



790S140100 DOCKET 30-494 Byron Station, Unit 1 

IE Imp Repts SO-154/7B-Q9 b 30-433/78-09 on 781031-1102. 
Noncompliance noted : fai lure ha folluu procodure re insp of 
deiiccants inside valves & deviation from procedure's. 
NEIBLER, J. H. , LEE, E. W. , HAVE9. D. H. Region 3, Chicago, Office of 

the Director. 78/12/15. 13pp. 

7902090091 DOCKET 30-454 Dgron Station, Unit 1 

Ack receipt of 7901S2 Itr informing NftC of steps to*en to, 

cornet violations notad in IE Insp Repts 30-454/7B-07 b 

30-4S3/7B-09. 

HEISHMANr R. F. Region 3, Chicago, Reactor Construction fc 

Engineering Support Branch. 79/01/31. Ip. 



790S22O139 DOCKET 30-159 Byron Station, Unit 2 

Notice of appearance oP M ttarrnan & RJ Qoddard on bohalf of 

NUC. Cert i flea te of live one}. 

RAHMAN, M. Office of the Ciacotive toga] Director. 79/01/39. l[i. 

79O332O157 DOCKET 50-435 Byron Station, Unit S 

Answer in opposition to M Waterman's petition to Intorvnni?. 
Petition falls to saKinPy intere&t roquir eitient ?< does not 
include contentiorft, Certificate of Bvc encl. 
KARMAN.H. OffUo of the Eietutive Legal [Mroctar. 79/01/?! r y. 4(io, 

7902360304 DOCKET SO-1B9 Byron Statlnn, Unit 3 

An BUSTS DaKalb Area Alliance for RuBponBlMB EnargM petition 

ta i ntorvene. Stand ing requirement sotia* 1 stir sub- j to 

author! lat I on Cor MJ BhlnoPlug to act on tlialr behalf. 

Contentions must be fllod-Ccrtificalo of 3vc and. 

HARMAN.H. Office of the Eiecutive Legal Director. 79/OI/39. 4pp. 



7902090101 DOCKET 50-434 Byron Station. Unit 1 

Responds to NHC 7B122ei Itr re violations noted in IE Insp 
Rept BO-4B4/7B-09 J. 30-455/7S-O9. Corrective actions: re-vised 
Insp procedures for valves stored outside or inslda unheated 
enclosuresiueldlng procedures revised. 
REED.C. Commonwealth Edlaon Co. 79/01/22. 5pp. 

79021B0034 DOCKET SO-434 Byron Station, Unit 1 

Foruiardi IE Info Notice 79-01. "Bergen-Pn ter son Hydraulic 
Shock St Suiag Arresters (HESA)". 

KEPPLER, J. Q. Region 3. Chicago. Office of the Director. 79/02/OH. 

4pp. 

7902210220 DOCKET 5Q-454 Duron Station. Unit 1 

Forwards IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment. " W/li*t of 11 systematic evaluation program 
plants for uhich no action is required. 

KEPPLER, J. 0. Region 3, Chicago, Office of the Director. 79/02/09. 

IP- 



79O223OIB6 DOCKET 50-155 Dyron Station, Unit B 
Furuiarils 1 970 Annual lient for utility. 
BRE5EMANN, R. W. Common-weal th Ediion Co. 79/OB/1S. Ip. 



790S230194 DOCKET 30-435 Dyron Station, Unit E 

1970 Annual Kept. Hevl OUJB 1970, Pivo ifoar aummnnj of 

operations i< mgt, t< Pinanical statoment. 

Commonwealth Edison Co. 7H/ia/3l. 34pp. 



790S14007B DOCKET 9D-155 ffurcn Station, Unit 2 

Forwards Amend 18 to application for const permits t< 
operating I it enseo , iu/rospon5 es to NFIC questions raised 
during FBAR acceptance revieui, Lists questions unansuored dite 
to t ime 1 1 mi t. 
REED, C. Commonueal to Ediann Co. 79/O2/OB. Spp. 

79021400BA DOCKET 50-135 Byron Station. Unit 2 

Amenfl IS Eo FSAR. Ine 1 udeB rosponaes to NRC questions raised 

during FSAR acceptance rovlnui. 

H Commonwealth Edison Co. 79/01/31. 7HOpp, 



130 



7903230I6A DOCKET 50-455 B^ron Station, Unit 2 

Forwards affidavit required by 10CFH2. 101 <a> (4) stating 
that Amend 18 to FSAR has been distributed in accordance 
uil th 7B1Q2O Itr. 
NAUOHTON, W. F. Commonwealth Edison Co. 79/02/16. 2pp. 



DOCKETED ITEMS 



7902HO090 DOCKET 50-455 Byron Station, Unit 2 

Forwards IE Insp Flepts 50-434/70-09 (. 50-455/70-09 on 
761031-1 103. notice af violation !i notice of deviation. 
HEISHMAN.R. F Region 3, Chicago, Reactor Construction 

Engineering Support Branch. 7B/12/2H. 2pp. 



790209O3BO DOCKET SO-456 Braidwaod Station. Unit I 

Petition bg P Noinor.L Creek, L d A Walsh to intervene. 

Petitioners claim they will be adversely affected by 

radioactive releases !i d i scharges. Affirmations fr Certificate 

of 8vc end. 

GORDON, T. Waalor. Evans & Gordon. BDCKi C. A. Bock. C. E. 79/01/12. 

17pp. 



790205027S DOCKET 50-456 Braiduiood Station. Unit 1 

Informs of establishment of Licensing Hoard in proceeding. 
LAZO.R.M. Atomic Safety and Licensing Board Panel. 79/01/83. 



8pp. 



7<?O2140O92 DOCKET 50-455 Byron Station, Unit 2 
Notice of violation from insp on 7B1031-1102. 
Region 3, Chicago, Office of the Director. 70/12/13. lp. 

79O2140CW5 DOCKET 30-453 Byron Station, Unit 3 
Notice of deviation From insp on 701031-1102. 
Region 3, Chicago, Office of the Director. 78/1H/13. 3pp. 

79O21401OO DOCKET 50-135 Byron Station, Unit 2 

IE Insp Repts 50-454/78-09 !, 50-455/70-0? on 781031-1102. 
Nonccmpliance noted . fai lure to follow procedure re insp of 
desiccants inside valve! b deviation from procedures. 
NEISLER.J.H , LEE.E.H.. HAVES, D U. Region 3, Chicago. Office of 

the Director. 70/13/13. 15pp. 

79Q2O9Q091 DOCKET 50-455 Dyron Station. Unit 2 

Acli receipt of 790132 Itr informing HRC of steps taken to 

correct violations noted in IE Insp Rcpts 30-454/7B-09 !. 

30-453/79-09. 

HEISHMAN.R.F Region 3. Chicago, Reactor Construction & 

Engineering Support Dranch. 79/01/31. IP 

7^02090101 DOCKET 50-455 Byron Station. Unit 2 

Responds to HRC 701SSA Itr re violations noted in IE Infip 
Hepts 30-451/7B-Q9 t, 50-455/7B-09. Corrective actions: revised 
insp procedures for valves stored outside or inside unhoated 
enclosures* we Iding procedures revised, 
REEO.C. Commonwealth Edison Co. 79/01/32. Spp. 

7903120054 DOCKET 50-455 Dyron Station, Unit 2 

Foruiards IE Info Notice 79-01. "Dergen-Paterson Hydraulic 
Shock ! Sway Arresters (HSSA)". 

KEPPLER. J. G. Region 3. Chicago, Office of the Director. 79/05/02. 

4pp. 

7902210220 DOCKET 50-455 Hymn Station. Unit 2 

Forwards IE Bulletin 7"7~(H. "Environ Qualification of Class 
IE Equipment. " W/lisl of 11 systematic evaluation program 
plants For which no action is required. 

KEPPLER.J.G. Region 3, Chicago. Office of the Director. 79/03/09. 

lp. 

790227025S DOCKET 50-455 Qyron Station, Unit 3 

Forwards IE Info Notice 79-03, "LimitDrque Valve Geared 

Limit Switch Lubricant. " 

KEPPLEfi, J. 0. Region 3, Chicago, Office of the Director. 79/O2/09. 



7903360064. DOCKET 30-456 Braidwood Station, Unit 1 

Forwards undated distribution lists for plant's environ 
repts ti amends. Lis ts replace tftose sent OB encl to 761101 
Itr from PM Krautier. 
SLATER. M. Environmental Project Branch 1. 79/01/23. 9pp. 



7902220053 DOCKET SO-4S6 Uraidwood Station, Unit 1 

Forwards, affidavit stating that distribution of environ 
rept.opffrat ing license stage, has been made in accordancf 
w/NRC 7B102Q Itr. 
WAUGHTC-N, W. F. Commonwealth Edison Co. 79/03/13. ip. 



7903150436 DOCKET 30-45i Braiduiood Station, Unit 1 

Util's answer to petition to intervene filed by M Wetrmn. 
Opposei petition on grounds of failure to iitablliN standing 
& failure to specify proper aubj for evidentiary hearing. 
Noticei of appearance ft Certificate of Eve encl. 

MILLER. M. I.. MUrtPHY.P.M, . BIELAWSKI, A. P. Isham, Lincoln & Deal! 
79/01/23. 14pp. 

7902130066 DOCKET 50-456 Braiduiood Station. Unit 1 

Ail receipt of 790103 Itr requesting operating licgnse far 
facitlly be denied. Commissioners cannot respond due to 
pending status before A&LB. 

DEVQUNQ.R.C. Division of Site Safety ti Environmental Analysis. 
79/01/29. 3pp. 



7902120070 DOCKET 30-456 Braldiuood Station. Unit 1 
Request* operating license for facility be denied. 
CORBIN.T. Affiliation Unknown. 79/01/03. lp. 



7902130073 DOCKET 50-456 Braiduiood Otation. Unit 1 

Utll urges denial of petitions to intervene submitted by 

Bob Kelner Farms. League af Women Voter* of Rockf ord. Dekalb 

Area Alliance for Responsible Energy & Sinnisslppi Alllano 

for Environ, Certificate at Svc encl. 

DIELAU9KI. A. P. . MILLER, M. I., MUrtPHYrP.M. Isham, Lincoln t. Deal*. 

79/01/29. 16pp. 

79Q214OOBO DOCKET 50-456 Bralduood Station. Unit 1 
Responds to 7901O2 Itr protesting 1 icons ing. Forwards 
response to Corbin 77O1O3 Itr IB/similar concerns, eip lalnlng 
measufea being taken to assure public safety. 

DEYOUNQ.R. C. Division of Site Safety h Environmental Analysis. 
79/01/29. lp. 

79031400S3 DOCKET SO-4S6 Braidiuood Station. Unit 1 

Protests licensing & resultant land b ulldllfe disturbance*. 
Expresses concern re impact on local uiell water & potential 
haiardt of cooling pool, 
BUBAN, T. Affiliation Unknown. 79/01/02. 3pp. 

7902220139 DOCKET 50-436 Braidwood Station. Unit 1 

Notice af appearance af M Karman & F!J Onddard on behalf of 

NRC. Certificate of Bvc encl, 

HARMAN, M. Office oF the Eiecutive Legal Director. 79/01/29. lp. 



7903230157 DOCKET 5O-456 Braidumod Station, Unit 1 

Ansuier in opposition to M Uesterman's petition to Intervene. 
Petition fails to satisfy interest requirement & does not 
include contentions. Certificate of Bvc incl. 
KARMAN.M. Office of the Eiecutivo Legal Director. 79/01/39. 



79022605BB DOCKET 50-456 Braiduood Station, Unit 1 

Ansuers Bridget Little Rorem, Inc petition to intervene. 
Petitioners have satisfied standing requirement, but adequacy 
of petition cannot bo decided on until contentions are 
filed. Certificate of Svc encl. 
HAHMAN.M. Office of the Executive Legal Director. 79/01/39. 



7903130203 DOCKET 30-456 Braiduood Station, Unit i 

Mould appreciate being kept advised on petition to intervene 

filed by "BL Rorem. 

O'BRIEN.O.M. House of Rep. 79/01/19. lp. 



4pp. 



4pp. 



7902230061 DOCKET 50-436 Braiduiood Station, Unit 1 

Informs that TRADQC Pamphlet 350-30, "Interservice Procedures 
for Instructional Sys Development" referenced in NUREO-0219 
is available in microfiche .form from NRC. 
DESAM, M. J. [JiviBion of Document Control. 7S/11/20. 3pp. 

7902010319 DOCKET 5Q-45A Brafduood Station. Unit 1 

Concerned that produc ti on, s torage !. transportation of spent 
fuel subjects public to radioactive waste exposure t. affects 
health & safety of environ. Util should be responsible for 

' Insurance tDstB.Urges licejise be denied. ,,,,, 

RDREh.n.L. , (IOREJ1, R. . FROTHINQHAM, D. Affiliation Unknown. 79/Q1/11. 
7pp, 



7903130203 DOCKET 50-456 Braidtuood Station. Unit 1 

In response to 790119 Itr to C Kammerer. advises that NRC 
filed answer an 790129 to petition to intervene of BL Rorem. 
Premature for ASLB to rule on adequacy of petition as uhale 
at present time. 

GOSBICK.L.V. Office op the Eecutlve Director for Operations, 
79/02/07. lp. 



7903330186 DOCKET 30-456 Braiduoad Station, Unit 1 
Forwards 197B Annual Rept for Util. 
BRE8EMANN, R, W, Commonweal th p Edi son Co. 79/02/13. i 

7902230194 DOCKET 50-496 Braiduiood Station, Unit 1 
1976 Annual Rep t. Reviews 197H, five year summary of 
operations & mgt, & finanical statement. 
* Commonwealth Edison Co. 7S/13/31. 34pp. 



DOCKETED ITEMS 



131 



790214007B DOCKET 5D-4B6 Bralduiood Station, Unit 1 
Forward! Amend IB to application far canst permits b 
operating 1 icensea. in/responses to NRC questions raised 
during FBAR acceptance review. Lists questions unanswered due 
to tins 1'imit. 
REED. C. Commonwealth Edison Co. 79/02/08. 2pp. 

7902140086 DOCKET 50 -4 3 6 Bralduood Station- Unit 1 

Amend IB to FSAR. Includes responses to NRC questions raised 

during FSAR acceptance review. 

Commonwealth Edison Co. 79/01/31. 730pp. 



7902130070 DOCKET SO-457 Draiduood Station, Unit 2 
Requests operating license for facility be denied. 
CQRBIN.T Affiliation Unknown 79/O1/03. Ip. 



7902130073 DOCKET 30-457 Braidiuood Station, Unit 2 

Util urges denial of petitions to intervene submitted by 
Dob Neiner Farms, League of Women Voters of Roc kf ord, Dekalb 
Area Alliance for Responsible Energy b Sinniasippi Alliance 
for Environ. Certificate of Svc encl. 
HIELAUEKI.A P. lafcam. Lincoln !< Beale. 79/O1/39. lipp 



7902230166 DOCKET 50-436 Bralduood Station, Unit 1 

Forward! affidavit required by 10CFR2. 101 la>(4) stating 
that Amend 1G to FBAR hai bean distributed in accordance 
with 7B1020 Itr. 
NAUOHTON, W. F. Commonwealth Edison Co. 79/O2/lo. 2pp. 



79021400SO DOCKET 50-457 Braiouiood Station, Unit 2 

Responds to 790102 Itr protesting ! icons ing. Forwards 

response to Corbin 7901O3 Itr w/similar concerns, e iplaining 

measures being taken to assure public safety. 

DEYOUNQ,R.C, Division of Site Safety !. Environmental Analysis 

79/01/29. Ip. 



7902130094 DOCKET 30-456 Dralduiood Station, Unit 1 

Forward! IE Info Notice 79-01. "Bergen-Patorson Hydraulic 
Shock b Buig Arraitors <H88A>". 

KEPPLER, J.O, Region 3, Chicago, Office of thu Director. 79/02/O2, 

4pp. 



7902140093 DOCKET 50-4S7 Braiduood Station, Unit 2 

Protest! licensing !i resultant land ti wildlife disturbances. 
Expresses concern re impact on local luell unter !t potential 
haiards of cooling pool. 
BUBAN.T, Affiliation Unknown 79/01/02. 2>p 



7902810220 DOCKET 30-496 Bralduood Station, Unit 1 

Forwards IE Bulletin 79-01, "Environ Qualification of Class 
IE Equipment." M/lict of 11 systematic evaluation program 
plant! for which no action is required. 

KEPPLER. J. 0. Region 3, Chicago' Office of the Director. 79/O2/09. 

Ip. 

7902270292 DOCKET 30-436 Braiduiood Station. Unit 1 

Foruardf IE Info Notice 79-03. "Limitorque Valve Geared 
Limit Switch Lubricant. " 

KEPPLER, J. 8. Region 3, Chicago. Office of the Director, 79/02/O9. 

Ip. 

7905980066 DOCKET 50-437 Draiduood Station, .Unit 2 

Forwards updated distribution lifts for plant's Environ 
Reptfl fc aaendi. List replaces those sent as encl to 761101 
Itr froa PM Kreutier. 
SLATER, M. Environmental Project Branch 1. 79/01/2S. 6pp. 

7902220093 DOCKET 30-497 Braidiuood Station, Unit 2 

Forwards affidavit stating that distribution of environ 
rept, operating license stage, has been msdo In accordance 
w/NRC 791020 Itr. 
NAUOHTON, H. F. Commonwealth Edlton Co. 79/02/13. Ip. 

7902230061 DOCKET 30-497 Braiduood Station, Unit 2 

Informi that TRADOC Pamphlet 390-30, "Interservlce Procedures 
fop Instructional Byi Development" referenced In NUREQ-OB19 
IB available in microfiche form from NRC. 
BESAU.W. J. Dlviilon of Document Control. 7B/11/20. 3pp. 



7903220139 DOCKET 90-457 Braiduood Station, Unit 2 
Notice of appearance of M Karman & RJ Coddard nn b 
NflC. Certificate of Svc end. 
KARMAN, M. Office of the Executive Legal Director. 



7902320157 DOCKET 50-497 Qraidwood Station, Unit 2 

Answer In opposition to M Ueeterman's petition for leave to 
intervene. Petition fails to satisfy interest requirement 6 
does not include contentions. Certifl cate of Svc encl. 
KARMAN.M. Office of the Executive Legal Director. 79/01/H9. 

7902260BBB DOCKET 50-4S7 Qraidwood Station. Unit 2 

Answers Bridget Little Rorem. Inc petition to intervene. 
Petitioners have satisfied standing requirement, but adequacy 
of petition cannot be decided on until contentions arc 
filed. Certificate Df Svc encl. 
KARMAN.M. Office of too Executive Legal Director. 79/01/89. 

7903130203 DOCKET 50-187 Draidmood Station, Unit 2 

Mould appreciate being kept advised on petition to intervene 

filed by BL Rorem. 

O'BRIEN, 0, M. House of Rep. 79/O1/19, Ip. 

7903130303 DOCKET 30-457 Draidwood Station, Unit S 

In response to 7901 W Itr to C Kammerer, advise i that NHC 
filed answer on 770139 to petition to intervene- nf BL Rarem. 
Premature for ASLD to rule on adequacy -af petition as whole 
at present time. 

QOB8ICK.L. V. Office of the Executive Director for Operations 
79/02/07. Ip. 



4pp. 



4pp. 



790201031? DOCKET 50-437 Braldunod Station. Unit 2 

Concerned that production. storage b transportation of spent 
futl iubjactt public to radioactive waste exposure k affects 
health k safety af environ. Util should be respaniible for 
Insurance costs. Urges license be denied. 

ROHEM.B.L., ROREM.R., FROTH I NO HAM, D. Affiliation Undnou-n. 79/01/11. 
7pp. ' 

79020903BD DOCKET 30-437 Braidwood Station. Unit 2 

Putltlon by P Ntintr,L Creek, L k A Walsh to intervene. 
Petitioners claim thu will be adversely affected by 
radioactive releases fc dlichargBS. Aff irmotion h Certificate 
of Bvc and. 
GORDON, T. Waaler, Evans b Cordon. 79/01/12. 17pp. ' 

7905090279 DOCKET 90-437 Draidwood Station, Unit 2 

Informs of establishment of Licensing Board in proceeding. 
LAZOiR.H. Atomic Safety and Licensing Hoard Panel. 79/01/23. 2pp. 

7908130436 DOCKET 90-497 Bra id wood Station. Unit 2 

Utll'i aniuir to petition to intervene filed by M Uesterman. 
Opposes- petition on grounds of failure to establish standing 
d failure to epeclfy proper mbj for evidentiary hearing. 
'Nutlets of appearance & Certificate of Svc and. 
MILLER, M.I. Iiham, Lincoln & Dealt. 79/01/35. 14pp. 

7702120066 DOCKET 90-457 Braiduood Station, Unit 2 

Act receipt of 790103 Itr requesting operating license for 
facltlly be denied, Commissioners cannot respond due to 
pending status befure ABLB. 

DEYOUNO, ft. C. Division of Bite Safety tc Environmental Analysis, 
79/01/29. 2pp. 



7902330106 DOCKET 50-437 Draiduood Station, Unit 2 
Forwards 197S Annual Ropt far util. 
UREBEMANMiR. W. Commonwealth Edison Co. 79/OS/13. Ip. 

7902330194 DOCKET 50-437 Braiduood Station. Unit 3 
197B Annual Rept. Revieus 197B. five yanr summary of 
operations & mgt. & flnanical statement. 

Commonwealth Edison Co. 78/12/31, 34pp. 

790214007B DOCKET 30-457 Braidwood Station. Unit 2 
Forwards Amend IB to application for const permits & 
operating 1 teenies, w/responses to NRC questions raised 
during FSAR acceptance review. Lists questions unanswered due 
to time limit. 
REED.C. Commonwealth Edison Co. 79/02/OB. Spp. 

79021400B6 DOCKET 50-4S7 Braidwnod Station. Unit 2 

Amend IB bo FSAR. Includes responses to NHC questions raised 
during FSAR acceptance review. 

* Commonwealth Edison Co. 79/01/31. 750pp. 

7902230166 DOCKET 50-457 Braidwood Station. Unit 2 

Forwards affidavit required by 10CFR2. lOt(a) (4) stating 
that Amend IS to FSAR has been distributed in accordance 
with 791020 Itr. 
NAUOHTON. H. F, Commonweal th Edison Co. 79/O3/lfi, apo 

7902120054 DOCKET 50-457 Braidwood Station, Unit 2 

Forwards IE Info Notice 79-O1, "Dergen-Patersan Hydraulic 

Shock it 9ulay Arreitori <H3SA>", ! 

KEPPLER, J. 0. Region 3. Chicago, Office of the Director. 79/O2/02. 



132 



DOCKETED ITEMS 



7902210230 DOCKET 50-457 Braidwood Station, Unit 3 

Forwards IE Bulletin 77-01, "Environ Qualification of Class 
IE Equipment. " H/list of 11 systematic evaluation program 
plants for which no action is required 

KEPPLER, J.G. Region 3, Chicago, Office of the Director. 

IP 



7903260023 DOCKET 50-160 WPPSS Nuclear Project, Unit 1 
Forwards IE Insp Rept6 50-460/7B-OB EC 30-913/7B-O8 on 
781 iaa-1301. No noncompliance noted. 

SPENCER, Q.S. Region 5, San Francisco, Reactor Construction it 

Engineering Support Branch. 79/01/09. 2pp, 



7902370253 DOCKET 50-457 Braidwoori Station, Unit a 

Forwards IE I-nfo Notice 79-03, "Limitnrque Valve Geared 

Limit Switch Lubricant " 

KEPPLER, J.G. Region 3, Chicago, Office of the Director. 



7902230061 DOCKET 50-458 River Bend Station. Unit I 

Informs that TRADDC Pamphlet 350-30. " Interservi ce Procedure? 
for Instructional Sys Development" referenced in NUREQ-0319 
is available in microfiche form from NRC. 
HESAW.W.J. Division of Document Control. 7B/11/20. 3pp 

7902260233 DOCKET 50-456 River Bend Station, Unit I 

Summariiei 78J213 meeting in Bethesda, HD. u/representati VBB 
at lit'!' w/post-CP applications to discuss pending OL 
review matters., including staff policies !i revieiu priority 
crl terifl. Discuss ion areas !. attendees lilt end. 
LICITHA.E. Light Water Reactors Branch 3. 79/01/12. Bpp. 

7902210179 DOCKET 50-45B River Bend Station, Unit 1 

Forwards IE Insp Repts 90-45B/7B-06 b 50-439/78-05 on 

781219-20. No noncomp 1 lance noted. 

5E1DLE. U, C. Region 4. Dallas, Reactor Construction J. Engineering 

Support Branch. 79/O1/12. 3pp. 

79D22101B2 DOCKET 50-450 River Bend Station. Unit 1 

IE Insp Rpts 50-45B/7B-06 50-459/78-05 on 7S1219-21.No 
noncomp 1 lance noted. Major areas Inspected: const phase 
environ protection programs (organ! tat ion t< admini stration, 
aud its. environ monitoring t< ecological study). 

EVERETT. R, J. , DRCWN, G. D. Region 3, San Francisco, Reactor 

Construction & Engineering Support Branch. 79/01/11, 3pp. 

7903130043 DOCKET 50-45B River Bend Station, Unit 1 

Forwards IE Info Notice 79-01 , "Bergen-Paterson Hydraulic 

Shock & Sway Arresters <HSSA). " 

SEVFHIT.K. V. Region 4, Dallas, Office of the Director. 79/03/02 

IP. 

7902230061 DOCKET 50-499 River Bend Station. Unit 2 

Informs that TRADQC Pamphlet 350-30. "Interservice Procedures 
for Instructinnal Sys Development" referenced in NUREO-oai9 
Is available in microfiche form from NRC. 
BESAU.W. J. Division of Document Control. 7B/11/20. 3pp, 

7902260239 DQCK'ET 50-499 River Bend Station, Unit 3 

Summariies 7B1 213 meet ing in BEthesda, MD, u/representati ves 
of utils w/posfc-CP applications to discuss pending OL 
review matters, including staff policies !< revloy priority 
tritaria, Discussion areas J. attendees list encl. 
LIClTftA.E. Light Hater Reactors Branch 3. 79/01/13. Bpp. 

7902210179 DOCKET 30-459 River Bend Station, Unit 2 
Forwards IE Iusp Repts 90-43Q/7B-06 (. 50-439/76-05 on 
7B1219-30. No noncompliance noted. 

SEIDLE.W.C. Region 4, Dallas, Reactor Construction ti Engineering 

Support Branch. 79/O1/12. 2pp. 

7902210182 DOCKET 90-459 River Bend Station, Unit 2 

IE Insp Rents 50-43B/7Q-06 50-459/7B-03 on 78iai9~21. No 
noncomp 1 lane D noted. Major areas Inspected : const phase 
environ protection programs (organ! tation It administration, 
audits, environ monitoring b ecological study). 

EVERETT.R. J. , DROWN, G. D. Region 5, San Franc i sco, Reactor 

Construction t, Engineering Support Branch. 79/01/11. 5pp. 



79022600S6 DOCKET 50-46O UPP8S NucUar Project. Unit 1 

IE Insp Repts 30M6O/7B-OB t, 90-313/78-08 on 7B1 128-1201, No 

noncompl iance noted. Major areas inspec ted : const activities 

Including open items From previous insp, 1 icensoe identified 

items !' containment itecl structures d supports. 

ECKHAflDT. J. H. , HAIST, D. P. Region 5, San Francisco, Office at the 

Director. HAVNES.fi. C. Region 5, San Francisco, Reactor 

Construction & Engineering Support Branch. 79/O1/0?. Opp. 

7902120142 DOCKET 90-460 UPPSS Nuclear Project, Unit 1 

Forwards IE Info Notice 79-O1. "nergHn-Patorson Hydraulic 

Shock t- Suay Arrostors (HSSA)." 

ENGELKEN.R. H. Region 5, San Francisco, Office of the Director. 

79/O2/02. lp. 

79.02230071 DOCKET 50-460 WPPBS Nuclear Project, Unit 1 

Forwards IE Bulletin 79-01, "Environ Qualification of Class 

IE Equipment. " W/llst of 11 systematic evaluation program 

plants for Dhich no action is required. 

ENQLEKEN.R. H. Region 3, San Francisco, Office of the Director. 

79/02/09. lp. 

7902270393 DOCKET 30-460 WPPBB Nuclear Project, Unit 1 
Forwards IE Info Notice 79-03. "Limitorque Valve Beared 
Limit Suiitch Lubricant. " 

ENGLEKEN.R, H. Region 9, Ban Francisco, Office of the Director. 
79/02/09. lp. 

7902360235 DOCKET SO-461 Clinton Power Station, Unit 1 

Summariies 781213 meeting in Bethesda, MD, u/representatlvei 
of utils u/post-CP applications to discuss pending OL 
review matters, inc lud ing NRC policies !. review priority 
criteria. Discussion areas & attendees list encl. 
LICITRA.E, Light Water Reactors Branch 3. 79/01/1H. Qpp. 

7903120100 DOCKET 50-461 Clinbon Power Station. Unit 1 
Forwards IE Info Notice 79-01 , "Bergen-Pateraon Hydraulic 
Shock l< Euiay Arresters (HSSA). 

KEPPLER, J. G. Region 3, Chicago, Office of the Director. 79/02/02. 
lp. 

7902210192 DOCKET 50-461 Clinton Power Station, Unit 1 

Ack receipt of 790113 Itr informing NRC of steps token to 
correct violation noted in IE Insp Ropt 50-461/78-06. 
HEISHMAN.R. F. Region 3, Chicago, Reactor Construction b 

Engineering Support Branch. 79/OS/O2. tp, 

790S210199 DOCKET 5O-461 Clinton POIUBP Station, Unit 1 

Responds to NRC 781215 Itr re violations noted in IE Insp 
Rept 5O-461/7B-06. Currec tive ac tions: developed written 
procedure for operation of Husky's spot melding process, 
calibr gauges & instruments. 
GERSTNER.W. C. Illinois Power Co. 79/01/13. 3pp. 

7902210193 DOCKET 30-461 Clinton Pouier Station, Unit 1 
Forwards IE Bulletin .79-01, "Environ Qualification of Class 
IE Equipment. " U/list of 11 systematic evaluation program 
plants for which no action is required. 

KEPPLEH.J.G, Region 3, Chicago, Office of the Director. 79/02/09. 

lp. 

7903270383 DOCKET 30-461 Clinton Power Station, Unit 1 
Forwards IE Info Notice 79-03, "Limitarque Valve Geared 
Limit Switch Lubricant. " 

KEPPLER, J.O. Region 3, Chicago. Office of the Director. 79/03/09. 

lp. 



7902130043 DOCKET 50-459 River Bend Station. Unit 2 

Forwards IE Info Notice 79-01. "Bergen-Patorson Hydraulic 

Shock t< Suay Arresters (HBSA). " 

BEVFRlT.K.v, Region 4, Dallas, Office of the Director. 79/03/02 

lp. 



7903120100 DOCKET 50-463 Clinton Power Station, Unit 3 
Forwards IE Info Notice 79-01, "Bergon-Peterson Hydraulic 
Shock E. Sway Arresters (HSSA), 
HEPPLER.J.O. Region 3, Chicago, Office of the Director. 



7902070080 DOCKET 50-46O WPPBS Nuclear Project, Unit 1 
Summary of 79O1 17 meeting w/HPPS. Discusses environ 
qualification of equipment, 
DOURN1A, A. Light Hater Reactors Branch 3. 79/01/25. 



Bpp. 



7901190328 DOCKET 50-460 WPPSS Nuclear Project, Unit 1 
Forwards copies of NUREG/CR-040O, "Risk Assessment Review 
Oroup Rept to US NRC" to parties of proceed ino. NRC is 
developing polity statement re rept.W/o encl rept. 
KETCHEN,E. 0. Office of the Eiecutive Legal Director. 79/Q1/11 



7902210193 DOCKET SO-163 Clinton Power Station, Unit 3 

Forwards IE Bulletin 79-01, "Environ Qualification of Cls 
IE Equipment. " W/list of 11 systematic evaluation program 
plants for which no action is required. 

KEPPLER, J, G. Region 3, Chicago, Office of the Director. 79/02/09, 

lp. 

7902270353 DOCKET 90-463 Clinton Power Station. Unit 2 ' 
Forwards IE Info Notice 79-03, "Limitorque Valve Geared 
Limit Switch Lubricant." 
KEPPLER, J. G. Region 3, Chicago, Office of the Director. 79/02/09 



DOCKETED ITEMS 



133 



7902140226 DOCKET 50-463 Fulton Generating Station, Unit 1 
Inform* since const permit application has returned to 
normal licensing path.util mill resume normal communications 
w/partiei & will send no more monthly rept Itrs. 
IRWIN, D. P. Hunton !. Williams. 79/01/16. 2pp. 



79020603B1 DOCKET 50-46B Laguna Verde Station 

Requests amend to Export License XR-7S to includ 
Process Sys as another party to eiport. 
WILSON, B.D. General Electric Co , Nuclear Energy 
79/01/16. lp. 



7903110336 DOCKET 30-464 Fulton Generating Station, Unit 2 
Informs sines const permit application has returned to 
normal licensing pathiutll uiill resume normal communications 
ui/parties & will send no more monthly rept Itrs, 
1HWIN.D.P. Hunton t< Williams. 79/01/16. 2pp. 



790212022B DOCKET BTN-50-47O CEBSAR System 80 

BummarliflB 79Q111 meeting ui/C-E re antitrust consideration!!. 
Discussions held re NRC initial draft of questions for 
monitoring implementation & effects af NRC standard i lation 
program on NSSS vendor. 
CHANANIA. F. D. An ti -Trust Division. 79/01/12. 2pp. 



7903140113 DOCKET 50-fl66 Aliens Creek Nuclear Station, Unit 1 
Informs of NHC visit on 7903Q5-09 to alternative sites. 
FROELICH, R. W. Environmental Project Branch 1. 79/O2/01. 4pp. 

7902260592 DOCKET 30-466 Aliens Creek Nuclear Station, Unit 1 
NRC has reviewed nuclear pouier plant citing study discussed 
at 790103 meeting t intends to conduct more detailed review 
of certain sites. Plans to visit sites to obtain addl Info. 
List of questions encl. 
BALLARD, R. L. Environmental Project Branch 1. 79/02/03. 10pp. 



7903140064 DOCKET STN-30-470 CESSAR System BO 

Notification of 790207 meeting in Bethesda. MD, to discuss 
standard! tat ion policy !. results of acceptance review of 
CEBSAfi Sys SO F5AR. 
VILLALVA, I Btandardiiation Branch 79/O1/31. 2pp. 



7903360343 DOCKET 50-471 Pilgrim Nuclear Pouer Station. Unit 2 
Forwards licensees responses re BUR p-urging & ventint). 
GRUNNER.E.J. Region 1, Philadelphia, Reactor Operation; Nuclear 

Support Branch. 76/05/12, 3pp. 



7902230061 DOCKET SO-466 Aliens Creek Nuclear Station, Unit 1 
Informs that TRADOC Pamphlet 350-30, " Interservice Procedures 
for Instructional Sys Development" referenced in NUREG-O219 
is available in microfiche form from NRC. 
BESAW. H. J. Division of Document Control. 79/11/20. 3pp. 

790203024B DOCKET 30-466 Aliens Creek Nuclear Btationj Unit 1 
Applicant's response to TX PIRQ motion for certification of 
questions to ASUAB. Urges Board to deny motion, since 
petitioner's request for referral falls to meet 1OCFR2, 730 
criteria. Certificate of Bvc end. 

NEWMAN, J. R. i CULP.R. H, Unwenstein. Newman, Rels, Aielrad & Toll. 
COPELAND, J. G. Baker i. Dotts. 79/01/05. llpp. 

7902030044 DOCKET SO-466 Aliens Creek Nuclear Station. Unit 1 
NRC response to TX PIRO motion for certification. Believes 
nothing in the facts or law supports certification of three 
TX PIRQ questions. Urges motion be denied. Certi ficate of Svc 
enc 1. 

WODDHEAD. C. P. , BDHINKJiB. M. Office of the Eiecutive Legal Director. 
79/01/11. 9pp. 

7903060006 DOCKET SO-466 Aliens Creek Nuclear Station, Unit 1 
Applicant^ motion to strike WE Elenfro 7B1326 Itr as 
irrelevant & as untimely attempt to suppl his statement of 
contentions. Certificate of Bvc end. 

COPELAND, J. 0. , THRACH, C. G. BaVer !c Dotts. NEWMAN, J. R, 
Lown*tein. Newman, Reis.Axelrad t< Toll. 79/01/16, 5pp. 

7902130223 DOCKET 30-466 Aliens Creek Nuclear Station. Unit 1 
Petitions for suspension of proceedings on basis af 79011? 
withdrawal of NRC endorsement of WASH-140Qi uih ich has tainted 
NRC regulations & utll's studies. Certificate of Svc encl. 
HOOKER. K. Affiliation Unknown. 79/01/30. 2pp. 

79022600B6 DOCKET 30-466 Aliens Creek Nuclear Station, Unit 1 
Ratponfls to 790114 Itr requesting info for participating in 
hearings. No schedule established yet. Discusses tuio methods 
by Lihich public can participate in hearings.lt Is mandatory 
that petition to intervene be filed per 10CFR2. 714. 
ENQELHARDT, T. F. Deputy Executive Legal Director. 79/03/01. 2pp, 

7902220198 DOCKET 30-466 Aliens Creek Nuclear Station, Unit 1 
Motion for admission of tuio contentions previously ml tfidraiun 
dua to Rasmussen Kept re reactor bursting accidents fc 
meltdouin. Submits Class 9 accidents to be considered. Mall ing 
list ancl. 
BCOTT.J. Teas Public Interest Research Group. 79/02/02. 4pp. 

7903330026 DOCKET 30-466 Aliens Creek Nuclear Station. Unit 1 
Order ruling on Intervention petition. Admits some as 
parties w/certatn contentions & alloys others to make a 
limited, appearance statement. 

CHEATUM. E. L. , L1NENBERGER. 0. A, WOLFE, S. J. Atomic Safety and 
Licensing Board Panel. 79/02/09. 81pp. 



7902210048 DOCKET 30-471 Pilgrim Nuclear Pouer Station,, Unit 3 
Forwards info re categori latlon of recent reg guides, by 
Regulatory Requirements Review Committee that may be- useful 
for future planning. W/att Regulatnrij Requirements Review 
Committee Meeting 31 Summary re categori iation. 
DOVD.R.B. Division of Project Management. 79/O1/36. 41pp. 

7902370334 DOCKET 50-471 Pilgrim Nuclear Paiuor Station, Unit S 
In response to 79O119 request for certain commitments re 
ATWB, advises that plant design will not preclude 
supplementary pro