Available from
GPO Sales Program
Division of Technical Information and Document Control
U. S. Nuclear Regulatory Commission
Washington, D. C. 20555
and
National Technical Information Service
Springfield, Virginia 22161
NUREG-0540
Vol.2, No. 7
July 1-31, 1980
Division of Technical Information and Document Control
Office of Administration
U.S. Nuclear Regulatory Commission
Washington, D.C. 20555
*****
•' s
CONTENTS
Preface v
Arrangement of Items by Docket Number ix
Alphabetic Arrangement of Docket 50 Items by Facility Name xvii
Docketed Items 1
Low Level Radwaste Disposal Sites - Docket 27 1
Domestic Licensing of Source Material - Docket 40 2
Domestic Licensing of Production and Utilization Facilities - Docket 50 12
Domestic Licensing of Special Nuclear Material - Docket 70 336
Packaging of Radioactive Material for Transport and Transportation of
Radioactive Material Under Certain Conditions - Docket 71 351
Nondocketed Items 361
IOCFR — Commission Meeting Records 361
ACRS — Advisory Committee on Reactor Safeguards 362
COMMISSION — NRC Commissioners 364
CONTRACT - NRC Contracts and Modifications 367
DISCLOSURE — Financial Disclosure Information 371
FOIA — Freedom of Information Act Requests and Releases 371
GEN TECH IS — Generic Technical Issues 377
I&E — Inspection and Enforcement 377
MISC — Public Document Room Miscellaneous 378
NUREG — NUREG Reports and Related Correspondence 380
ORG — Correspondence with Other Organizations 383
PR — Proposed Rule 384
PRM — Petition for Rulemaking 395
PROJ — Projects - Predockct Licensing 396
PT21 •— NoncompHance Reports and Related Correspondence 397
QA999 — Quality Assurance Inspections 397
REGGD — Regulatory Guides 401
RES — Research and Technical Assistance Reports 402
REVIEW GRP — NRC Research Review Groups 404
SECY — Position Papers Before the Commission 405
STATE PROG - State Programs 407
TOPREP — Vendor Reports and Related Correspondence 409
WASTE MGT — Nuclear Waste Management 412
XPORTLIC — Export and Import Licenses 413
Personal Author Index 423
Corporate Source Index 459
Report Number Index 493
Cross Reference of Enclosures to Principal Documents 495
Appendix A - Definitions of Docket 50 Categories 513
Appendix B - Definitions of Nondocketed Categories 521
in
PREFACE
The Title List of Documents Made Publicly Available is a monthly publication. It contains descriptions of
the infoimation received and geneiated by the U.S. Nuclear Regulatory Commission (NRC). This informa-
tion includes (1 ) docketed material associated with civilian nuclear power plants and other uses of radioactive
mateiials and (2) nondocketed material received and generated by NRC pertinent to its role as a regulatory
agency. As used here, docketed does not refer to Court dockets; it refeis to the system by which NRC
maintains its regulatoiy records. This series of documents is indexed by a Personal Author Index, a Corporate
Source Index, and a Report Number Index.
The docketed information contained in the Title List includes the information formerly issued through the
Department of Energy publication Power Reactor Docket Information, last published in January 1979.
Microfiche of the docketed information listed in the Title List is available for sale on a subscription basis
fiom the National Technical Information Service (NTIS). See NOTES at the end of the Preface for the
complete NTIS address.
We cncouiage your comments, criticisms, and suggestions. In particular, if there are title descriptions that
aie not meaningful, please let us know so that we can correct the data base. In so far as possible, we would
like this document to be a valuable part of your reference material.
DOCKETED ITEMS
The listings within dockets are divided into the categories used for filing and searching In the NRC Public
Document Room. Those categciies are;
A. Application/constiuction stage documents and correspondence
B. Utility Preliminary Safety Analysis Report (PSAR), amendments
C. Utility Environmental Repot t (ER), amendments and couespondence
D. NRC Draft and Final Environmental (Impact) Statements (DBS and FES), and correspondence
li. NRC Safety Evaluation Report (SER), supplements and correspondence
F. Security, medical, emergency and fire-protection plans
Ci, Adjudicatory correspondence
II. Geneial correspondence
I. Financial information
J. Insurance and indemnity information
K. Utility Final Safety Analysis Report (FSAR) and amendments
L. Limited work authorization and related correspondence
M. Ami! rust correspondence
N. Antilrusi hearing transcripts
0. Advisory Committee on Reactor Safeguards (ACRS) reports and correspondence
P. Operating license stage documents and correspondence
0 Inspection reports, IP- Bulletins and eoncspondcnce
R Periodic operating reporh and related correspondence
S. Reporlablc occurrences, LliRs and rcliilcd coircspondence
T. Hearing transcripts on non-antitrust matters
U. Congressional/executive coirespomlcnec
V Licensing operator's utul rel;itcd correspondence
W. Decommissioning stage documents mid correspondence
Appendix A. sets forth those cutegoiics ami dchcribcd the materials available in each. Omission ol ,i
category in the listing lor a docket indicates that no documents in thai category weic filed in the nine
penod ill the icpoit
The principal elements ol Hie cutties in the hsl .11 c*
(]j p, Operating licence stage documents & coiiespniulenec
©
, ©
7904170015 l-'cnwaids inlb on TMI ..IM 1 1 endue 7()04IO testimony, piclimimuy
ehmnology ol" NIU1 actions, description of events & generic consider [
ol incident.
RlillM, T A. Office of the Executive Directoi loi Opcialions
7[)/(M/l2.
I NRC/PDR Document ealcgoiy (sec Appendix A)
2. NKC Accession Number
3. Description orinfoimaticni contained in the document
4. Personal authoi. An asterisk in this position indicate:* that (lieie is no pcisona] author.
5. Corporate, agency 01 nonmdivhtiial son ice
d. Dale ordoeiimcnl desciibcil
7. Pages in document
H. Iftlus space is blank, the dociiincnl is nvjiilahle to the public only in the NRC Public Document Room,
1717 II Si , N.W., Washington, DC 20555, If this space is lillcil.it gives othci souices I'oi copies of (he
document . The enliy may he "Available at NRC" lor Mile; "Available at NTIS"; 01 "Avaihiblc at GPO "
The Docketed Items list is arranged sequentially by Docket Number, ciilegory, and then by date of principal
items. Entries indented and preceded by a dash arc items thai were submitted as enclosures to principal items
In general, indented items are not in accession number sequence. If the docketed document has a contiact
(PIN) number or a formal report number, it will appeal in the last line of [lie item following entry 5.
NONDOCKETED ITEMS
The nondocketed items are divided into the categories used for filing and searching In the NRC Public
Document Room. Those categories and thoh symbols are:
Commission Meeting Records
ACRS — Advisory Committee on Reactor Safeguards
COMMISSION - NRC Commissioners
CONTRACT — NRC Contracts and Modifications
DISCLOSURE — Financial Disclosure Information
FOIA — Freedom of Information Acl Requests and Releases
VI
GEN TECH IS — Generic Technical Issues
I&E — Inspection and Enforcement
MISC — Public Document Room Miscellaneous
NUREG — NUREG Reports and Related Correspondence
ORG — Correspondence with other organizations
PR — Proposed Rule
PRM — Petition foi Rulemaking
PROJ — Projects-Predocket Licensing
PT9 — Public Recoids
PT21 — Noncompliance Reports and Related Correspondence
QA999 — Quality Assurance Inspections
REGGD — Regulatory Guides
RES — Research and Technical Assistance Reports
REVIEW GRP — NRC Research Review Groups
RM — Rulemakings
SECY — Position Papers Before the Commission
STATE PROG — State Programs
TOPREP — Vendor Reports and Related Correspondence
WASTE MGT — Nuclear Waste Management
XPORTLIC — Expoit and Import Licenses
Appendix B sets foith llicsc categories and describes the material available in each. Omission of a category
in the listing foi a docket indicates that no documents in that category were filed in the time period of the
icport.
The principal elements of the nondockcted items are'
(V) NUREG - NUREG Reports and Related Correspondence
© a
790 1 060007 NU KEG/C R-0 1 6 1
"Dynamic Analysis to Establish Noiiruil Shock & Vibration Environs
Experienced by Radioactive National Shipping Package." Quaitcrly
Progress Report 780101-780331. Identifies paiameteis which affect
nomiiil shock & vibiation environs.
FIELDS, S.R., MECH, S.J. Hartford Engineering Development Laboialory.
FIN A-2093.f 78/ 1 1/30. 26pp. Available atNTIS. \
\ "" ' \
7) 00 (8) m (10) (6
1. Nondocketed category
2. NRC Accession Number
3. NRC Repoit Number
4. Title and description of Information contained In the document
5. Personal author(s). An asterisk in this position indicates that there ib no personal author
6. Corpoiate, agency 01 other nonindividual source
7. Contract or financial (FIN) number (if any). If the document has a secondary leport number
it will appear following this entry.
8. Date of document described
9. Pages in document
vii
10 If tins space is blank, the document is available <o the public only in the NRC Public Document Room,
1717 H St , N.W , Washington, DC 20555. if tint, space h tilled, it gives other sources for copies of
the document. The entry may be "Available at NRC" or "Available at NTIS." See NOTES on this
page for information on ordering publications.
The Nondocketed Items list is arranged sequentially by Accession Number within category, Indented
items preceded by a dash are enclosures to unindented items.
NOTBS:
1. The address for NRC is'
Director
Division of Technical Information and Document Control
U.S. Nuclear Regulatory Commission
Washington, D.C. 20555
To place orders, send check or money order, payable to the Superintendent of Documents. GPO Deposit
Account holders may charge their orders by calling (301) 492-9530.
2. The address for NTIS is •
National Technical Information Service
Springfield, Virginia 22161
To place orders for or to obtain price information about NRC publications at NTIS, either write to
NTIS or call the Sales Desk at (703) 5574650. Specify the NRC report number and title when you
place your order. Publications can be charged lo American Express credit cards; supply the charge-
card number when placing your order.
3. The address for tlie FDR is:
171 7 H Street, N.W.
Washington, D.C. 20555
To place orders, either write to the NRC PDR or call (202) 634-3274. When ordering documents listed
in this publication, please identify the Document Accession Number for each citation.
Paper copy and microfiche of the documents listed in this title list may be purchased. Reproduction
charges for duplication arc as follows; 8f! per page for standard size paper; 1 \i per page for oversized
paper (drawings); 25£ per microfiche for 24x diaxo duplicates. A minimum charge of $2.00 plus
postage is charged for mail orders.
Please acknowledge a willingness to assume charges for all orders but do not send payments, Orders
will be orocewH and mailed with a bill from Potomac Research, Inc.
viii
ARRANGEMENT OF ITEMS BY DOCKET NUMBER
Docket Name
27-010 Beatty, NV
27-039 Sheffield, IL, Nuclear Engineering Co.
27-047 Barnwell, SC, Chem-Nuclear Systems, Inc.
27-048 Richland, WA, Nuclear Engineering Co.
40-0215 S. F. Appliance, Ltd.
40-0299 Union Carbide Corp,
40-1162 Western Nuclear, Inc.
40-1341 Edgemont Uranium Mine, TVA, and
Mines Development, Inc.
40-1852 Fisher Scientific Co.
40-2061 West Chicago Facility, Kerr-McGee Corp.
40-2259 Pathfinder Mines Corp.
40-2561 Zircoa Products, Corning Glass Works
40-2674 Univ. of Notre Dame
40-2940 NL Industries, Inc.
40-3392 Allied Chemical Corp.
40-3453 Atlas Minerals
40-4337 Marquettc Univ.
40-4492 Federal American Partners (Mining)
40-4669 Case Western Reserve Univ.
40-5021 Standard Oil Co,
40-6622 Pathfinder Mines Corp.
40-6659 Petrotomics Co., Getty OH
40-6789 Howard Univ.
40-7402 Allegheny Ludlum Industries,
Chemtron Corp.
40-7982 Honeywell, Inc.
40-8027 Kerr-McGee Corp.
40-8045 Sulsman & Blumcnthal, Inc.
Page
Docket
1
40-8056
1
40-8102
1
40-8200
2
40-8304
2
40-8329
2
40-8380
3
40-8438
3
40-8452
4
40-8481
4
40-8502
4
40-8584
4
40-8585
4
40-8602
4
40-8647
• 4
40-8681
4
40-8693
5
40-8697
5
40-8698
5
40-8702
5
40-8714
5
40-8721
5
40-8727
5
40-8728
6
40-8745
6
40-8768
6
40-8771
ti
50-2
Name Page
Bronson Methodist Hospital, 6
Kalamazoo, MI
Exxon Minerals Co. USA, Exxon Corp. 6
Cleveland Cliffs Iron Co. 6
Wyoming Mining Corp. 6
Salem Hospital, Salem, MA 7
Rocky Mountain Energy Co. 7
Eastman Kodak Co. 7
Bear Creek Uranium Co. 7
Boeing Co, 8
Irigaray Mine, Wyoming Mining Corp. 8
Union 76 Minerals Exploration Co. 9
Wyoming Mining Corp. 9
United Nuclear Corp, 9
Kerr-McGee Corp. 9
Energy Fuels Nuclear, Inc. 10
Ogle Petroleum, Inc. 10
Rocky Mountain Energy Co. 10
Plateau Resources, Ltd. 10
Dept. of the Army, Armament Materials 10
Readiness Command
Cleveland Cliffs Iron Co. 10
Rocky Mountain Energy Co. II
Kcrr-McGee Nuclear Corp, II
Teton Exploration Drilling Co., Inc. II
Ogle Petroleum, Inc. II
Kerr-McGec Nuclear Corp. 12
Nitclear Assurance Corp. 12
Univ. of Michigan Research Reactor 12
IX
Docket Name
50-3 Indian Point Station, Unit 1
50-5 Pennsylvania Slate Univ Rcsearcli Reactor
50-10 Dresden Nuclear Power Station, Unil I
50-13 Hancock & Wllcot Co. Critical Facility
50-20 Massachusetts Institute of Technology
Research Reactor
50-27 Washington Slate Univ. Research React 01
50-29 Yankee-Rowe Nuclear Power Station
5047 Army Materials Rcsearcli Reactor
50-54 Union Carbide Research Reactor
50-57 Slate Univ. of New York Research Reactor
50-59 Texas A&M Univ. Research Reactor
50-62 Univ. of Virginia Research Reactor
50-67 McMastcr Univ, Research Rcacloi
50-70 General Electric Test Reactor
50-73 Gcncinl Electric Nuclear Test Reactor
50-77 Catholic Univ. of America Research
Reactor
50-83 Univ, of Horicln Training Reactor
50-87 Westinghouse Critical bxperiment
50-89 General Atomic Co.
50-97 Cornell Univ. Siero Power Reactor
50-9!) Hnbcock & Wilcox Test Reactor
50-106 Oregon State Univ.
50-111 North Caiolina Stale Univ. Research
Reactor
50-112 Univ. of Oklahoma Rcsearcli Reactor
50-116 Iowa Suite Univ. Research Reactor
50-123 Univ. of Missouri Research Reactor
50-124 Virginia Polytechnic Institute Training
Reactor
50-128 Texas A&M Univ. Research Reaclor
50-129 West Virginia Univ. Research Reactor
50-113 Hnmboldt Bay Power Plant, Unit 3
Page
Docket
12
50-134
13
50-135
13
50-139
16
50-142
16
50-150
17
50-151
17
50-152
18
50-155
18
50-156
18
50-157
19
50-160
19
50-163
19
50-166
19
50-170
19
50-171
20
50-182
20
50-184
20
50-186
20
50-187
20
50-193
20
20
50-199
20
50-201
50-206
20
50-208
20
50-213
20
50-219
21
50-220
21
50-223
21
50-224
21
50-225
Nnme Page
Worcester Polytechnic Institute Research 22
Reaclor
Walter Reed Reseaich Reactor 22
Univ. of Washington Research Reactor 22
UCLA Training Reactoi 22
Ohio State Univ Research Reactor 22
Univ. of Illinois Research Reactor 22
Florida West Coast Nuclear Group Inc. 22
Big Rock Point Nuclear Plant 22
UEIJV. of Wisconsin Reseat ch Reactor 25
Cornell Univ. Research Reactor 25
Georgia Institute of Technology Research 25
Reactor
General Atomic Co, 25
Univ. of Maryland Research Reactor 25
National Naval Medical Center 26
Peach Bottom Atomic Power Station, 26
Unit 1
Purdue Univ. Research Reactor 26
National Bureau of Standards Reactor 26
Univ. of Missouri Research Reactor 26
Space Radiation Research Reactor 26
Rhode Island & Providence Plantations 26
AEC
Manhattan College Research Reactor 27
West Valley Reprocessing Plant 27
San Onofre Nuclear Station, Unit 1 27
Columbia Univ. Research Reactor 30
Hacldam Neck Plant 30
Oyster Creek Nuclear Power Plant 32
Nine Mile Point Nuclear Station, Unit 1 35
Univ. of Lowell Research Reactor 36
Univ. of California Research Reactor 36
RPI Critical Experiment 36
Docket Name
50-228 Aciolosl Radiogiaphy & Research Reactor
50-236 Lockheed Airciaft Corp.
50-237 Dresden Nnclcai Power Station, Unit 2
50-243 Oregon State Univ. Research Renctoi
50-244 Robert Emmet Ginna Nuclear Plant, Unit 1
50-245 Millstone Nuclear Powei Station, Unit 1
50-247 Indian Point Station, Unit 2
50-249 Dresden Nuclear Power Station, Unit 3
50-250 Turkey Point Plant, Unit 3
50-251 Turkey Point Plant, Unit 4
50-254 Quad-Cities Station, Unit I
50-255 Palisades Nuclear Plant
50-259 Drowns Ferry Nuclear Power Station,
Unit 1
50-260 Browns Ferry Nueleai Powei Station,
Unit 2
50-261 II. B. Robinson Plum, Unit 2
50-263 Monticcllo Nueleai Generating Plant
50-264 Dow Chemical Co.
50-265 Quad-Cities Station, Unit 2
50-266 Point Beach Nuclear Plant, Unit I
50-267 Fort St. Vrain Nuclear Generating Station
50-268 Midwct Fuel Recovery Plant
50-269 Oconce Nuclear Station, Unit 1
50-270 Oconec Nuclear Station, Unit 2
50-271 Vermont Yankee Nuclear Powei Station
50-272 Salem Nuclear Generating Station, Unit 1
50-273 Bcznau Nuclear Station, Switzerland
50-274 U. S. Geological Survey Research Reactor
50-275 Diablo Canyon Nuclear Power Plant,
Unit 1
50-276 Georgia Tech Research Reactor
50-277 Peach Bottom Atomic Power Station,
Unit 2
Page
37
37
37
39
39
41
43
45
47
49
50
52
55
58
Docket
50-278
50-280
50-281
50-282
50-284
50-285
50-286
50-287
50-288
50-289
50-293
50-294
50-295
50-296
60
50-297
61
50-298
63
50-301
63
50-302
65
50-304
67
50-305
68
50-306
68
50-309
70
50-311
73
50-312
75
50-313
77
50-315
77
77
50-316
79
50-317
80
i
Name
Peacli Bottom Atomic Power Station,
Unit 3
Surry Power Station, Unit 1
Surry Power Station, Unit 2
Prairie Island Nuclear Station, Unit 1
Idaho Suite Univ. Research Reactor
Fort Calhoun Station, Unit I
Indian Point Station, Unit 3
Oconce Nuclear Station, Unit 3
Reed College Research Reactor
Three Mile Island Niicleai Station, Unit I
Pilgrim Nuclear Power Station, Unit I
Michignn Stale Univ. Research Reactor
Zion Nuclear Power Station, Unit 1
Browns Ferry Nuclear Power Station,
Unit 3
North Carolina State Umv PULSTAR
Reacloi
Cooper Nuclear Station
Point Beach Nuclear Plant, Unit 2
Crystal River Nuclear Plant, Unii 3
Zion Nuclenr Power Station, Unit 2
Kewaunce Nuclear Power Plant
PraEre Island Nuclear Station, Unit 2
Maine Yankee Atomic Power Plant
Salem Nuclear Generating Station, Unit 2
Rancho Seco Nuclear Gcnciating Station
Arkansas Nuclear One, Unit 1
Donald C. Cook Nuclear Powei Plant,
Unit I
Donald C. Cook Nuclear Power Plant,
Unit 2
Calvert Cliffs Nuclear Power Plant,
Unit I
82
85
88
90
92
92
94
97
99
99
107
109
109
112
114
115
117
119
121
123
125
127
129
131
133
135
136
XI
Docket Name
50-318 Calvert Cliffs Nuclear Power Plant,
Unit 2
50-320 Three Mile Island Nuclear Station, Unit 2
50-321 Edwin I. Hatch Nuclear Plant, Unit 1
50-322 Shoreham Nuclear Power Station
50-323 Diablo Canyon Nuclear Power Plant,
Unit 2
50-324 Brunswick Steam Electric Plant, Unit 2
50-325 Brunswick Steam Electric Plant, Unit I
50-326 Univ. of California at Irvine Research
Reactor
50-327 Sequoyah Nuclear Plant, Unit 1
50-328 Sequoyah Nuclear Plant, Unit 2
50-329 Midland Plant, Unit 1
50-330 Midland Plant, Unit 2
50-331 Duane Arnold Energy Center
50-332 Barnwell Reprocessing Plant
50-333 James A. Fitzpatrick Nuclear Power Plant
50-334 Beaver Valley Power Station, Unit 1
50-335 St. Lucie Plant, Unit 1
50-336 Millstone Nuclear Power Station, Unit 2
50-338 North Anna Power Station, Unit 1
50-339 North Anna Power Station, Unit 2
50-340 Scabrook Nuclear Station, Unit 1
50-341 Enrico Fermi Atomic Power Plant, Unit 2
50-344 Trojan Nuclear Plant
50-346 DavEs-Besse Nuclear Power Station, Unit 1
arlev Nuclear Plant, Unit 1
> I [nil ]
I
PflgC
Docket
139
50-36t
50-362
141
50-363
152
50-364
156
50-366
157
50-367
159
50-368
161
50-369
163
50-370
163
50-373
169
50-374
172
50-375
174
50-376
177
50-378
179
50-382
179
50-387
181
50-388
183
50-389
186
50-390
188
50-391
191
50-395
196
50-396
196
50-397
197
50-400
201
205
50-401
206
50-402
208
210
50-403
211
50-404
213
50-405
213
Name Page
San Onofre Nuclear Station, Unit 2 215
San Onofre Nuclear Station, Unit 3 217
Forked River Nuclear Station, Unit 1 219
Joseph M. Farley Nuclear Plant, Unit 2 219
Edwin I. Hatch Nuclear Plant, Unit 2 221
Bailly Generating Station 225
Arkansas Nuclear One, Unit 2 226
William B. McGuire Nuclear Station, 228
Unit 1
William B. McGuire Nuclear Station, 230
Unit 2
LaSalle County Station, Unit 1 232
LaSalle County Station, Unit 2 233
Nuclear Examination Reactor 235
North Coast Nuclear Plant, Puerto Rico 235
Caorso Nuclear Station, Italy 235
Wnterforcl Generating Station, Unit 3 235
Susquehanna Steam Electric Station, Unit 1 236
Susqnehanna Steam Electric Station, Unit 2 239
St. Lucie Plant, Unit 2 241
Watts Bar Nuclear Plant, Unit 1 242
Watts Bar Nuclear Plant, Unit 2 243
Virgil C. Summer Nuclear Station, Unit 1 244
Univ. of Virginia Cavalier Reactor 246
WPPSS Nuclear Project, Unit 2 246
Sheuron Harris Nuclear Power Plant, 248
Unit 1
Shearon Harris Nuclear Power Plant, 250
Unit 2
Shearon Harris Nuclear Power Plant, 252
Unit 3
Shearon Harris Nuclear Power Plant, 254
Unit 4
North Anna Power Station, Unit 3 255
North Anna Power Station, Unit 4 256
XH
Docket Name
50-406 Tuskcgee Institute Reseaich Reactor
50-409 La Crosse Boiling Water Reactor
50-410 Nine Mile Point Nuclear Station, Unit 2
50-412 Beaver Valley Power Station, Unit 2
50-413 Catawba Nuclear Station, Unit 1
50-414 Catawba Nuclear Station, Unit 2
50-416 Grand Gulf Nuclear Station, Unit 1
50-417 Grand Gulf Nuclear Station, Unit 2
50-423 Millstone Nuclear Power Station, Unit 3
50-424 Alvin W. Vogtle Nuclear Plant, Unit I
50-425 Alvin W. Vogllc Nuclear Plant, Unit 2
50-433 Univ. of California at Santa Barbara
Research Reactor
STN-50-437 Floating Nuclear Plant
50-438 Bellcfonte Nuclear Plant, Unit 1
50-439 Bellefonte Nuclear Plnnt, Unit 2
50-440 Perry Nuclear Power Plant, Unit 1
50-441 Perry Nuclear Power Plant, Unit 2
50-443 Senbrook Nuclear Station, Unit 1
50-444 Seabrook Nuclear Station, Unit 2
50-445 Comanche Peak Sleam Electric Station,
Unit 1
50-446 Comanche Peak Steam Electric Station,
Unit 2
50-448 Douglas Point Nuclear Station, Unit I
50-449 Douglas Point Nuclear Station, Unit 2
50-452 Greenwood Energy Center, Unit 2
50-453 Greenwood Energy Center, Unit 3
50-454 Byron Station, Unit 1
50-455 Byron Station, Unit 2
50-456 Braidwood Station, Unit 1
50-457 Braidwood Station, Unit 2
50-458 River Bend Station, Unit 1
50459 River Bend Station, Unit 2
Page
Docket
256
50-460
256
50-461
258
50-462
259
50-463
260
50-464
261
50-466
262
50467
264
50471
267
STN-50482
267
STN-50483
268
STN-50484
269
STN-50485
STN-50486
269
STN-50488
270
STN-50489
271
STN-50490
272
STN-50491
273
STN-50492
275
STN-50493
276
50496
277
50497
280
STN-50498
STN-50499
282
50-500
282
50-501
283
STN-50-502
283
STN-50-508
283
STN-50-509
284
50-513
285
50-514
287
50-515
288
STN-50-516
289
Name Page
WPPSS Nuclear Project, Unit 1 289
Clinton Power Station, Unit 1 290
Clinton Power Station, Unit 2 291
Fulton Generating Station, Unit 1 291
Fulton Generating Station, Unit 2 292
Aliens Creek Nuclear Station, Unit 1 292
Aliens Creek Nuclear Station, Unit 2 294
Pilgrim Nuclear Power Station, Unit 2 294
Wolf Creek Generating Station 294
Calloway Plant, Unit 1 297
Tyrone Energy Park, Unit 1 299
Sterling Power Project Nuclear, Unit I 300
Calloway Plant, Unit 2 300
Perkins Nuclear Station, Unit 1 302
Perkins Nuclear Station, Unit 2 303
Perkins Nuclear Station, Unit 3 304
Cherokee Nuclear Station, Unit 1 304
Cherokee Nuclear Station, Unit 2 305
Cherokee Nuclear Station, Unit 3 305
Montague Nuclear Power Station, Unit 1 306
Montague Nuclear Power Station, Unit 2 306
South Texas Project, Unit 1 306
South Texas Project, Unit 2 309
Davis-Besse Nuclear Power Station, Unit 2 312
Davis-Besse Nuclear Power Station, Unit 3 312
Haven Nuclear Plant, Unit 1 312
WPPSS Nuclear Project, Unit 3 312
WPPSS Nuclear Project, Unit 5 313
WPPSS Nuclear Project, Unit 4 313
Pebble Springs Nuclear Plant, Unit 1 314
Pebble Springs Nuclear Plant, Unit 2 315
Jamesport Nuclear Station, Unit 1 315
XIU
Docket Nninc
STN-5Q-5I7 Jamcsport Nudcai Station, Unil 2
STN-5Q-518 Hartsville Nuclear Plant, Unit 1
STN-50-519 Ilarlsville Nuclear Plant, Unil 2
STN-50-520 Hnrisvillc Nuclear Plant, Unil 3
STN-5Q-521 Harlsvillo Nuclear Plant, Unit A
SlN-50-522 SkngU Nuclear Power Project, Unit 1
STN-50-523 SJctigit Nuclear Power Project, Unit 2
STN-50-528 Palo Verde Nuclear Station, Unit 1
STN-50-529 Palo Verde Nuclear Station, Unit 2
STN-50-530 Palo Verde Nuclear Station, Unit 3
50-537 Clinch River Breeder Reactor
50-5J8 Memphis Station Univ. Research Reactor
STN-50-5'16 Marble Hill Nuclear Station, Unit 1
STN-50-547 Marble Hill Nil clear Station, Unit 2
50-549 Greene County Nuclear Power Plant
STN-50-553 Pliipps !3cncl Niiclcai Plan*, Unit 1
STN-50-5M Phipps Bend Nuclear Plant, Unit 2
S'IN-50-556 Mack Fox Station, Unit I
STN-50-557 Black I'm Station, Unit 2
STN-5Q-561 D-SAR-205
STN-50-566 Yellow Creek NucEcnr Plant, Unit I
STN-50-567 Yellow Creek Nuclear Plnnt, Unil 2
STN-50-568 NRP Nuclear, Unll I
STN-50-569 NEP Nuclear, Unit 2
STN-50-580 Erie Nuclcnr Plant, Unit 1
STN-50-581 Gric Nuclear Plmii, Unit 2
50-582 Sinulescrt, Unit 1
50-583 SuiKlcsert, Unit 2
STN-50-592 Pnlo Verde Nuclear Station, Unil 4
STN-50-593 Palo Verde Nuclear Siuiion, Unit 5
50-594 Ko-Ri, Units 3 & 4, Korea
STN-50-596 New Haven, Unit 1
STN-50-597 New Hnvcn, Unit 2
'(IRC
Docket
116
50-599
316
50-600
337
50-754
318
70-0008
319
700025
320
700027
321
70-0033
321
70-0036
323
70-0135
325
70-0143
326
70-0157
327
70-0184
327
70-0203
328
70-0364
330
70-0371
331)
7Q-03!>8
3.11
70-0474
332
70-0572
333
70-0625
333
70-OC87
333
70-0734
314
70-0754
335
335
70-0820
335
70-0824
335
70-0925
335
70-0971
335
70-0984
335
70-0997
335
70-1062
335
70-1100
336
70-1113
336
70-1143
Name
Carroll Facility I
Carroll Facility II
General Electric Test Reactor
Baltclle Columbus Laboi atones
Rockwell International Corp.
Bahcock & Wilcox Co
Texas hislriiments, Inc.
Combustion Engineering, Inc.
Balicock & Wilcox Co.
Nuclear Fuel Services, Inc.
Univ. of Texas
Wcstinghouse Electric Corp
Univ. of Notre Dame
Paiks Township Site,
Babcock & Wilcox Co.
United Nuclear Corp.
Dcpl. of Commerce
Upsala College
Monsanto Research Corp.
Howard Univ.
Union Carbide Corp.
General Atomic Co.
Vallecitos Nuclear Center,
General Electric Co.
United Nuclear Corp.
Bobcock & Wilcox Co.
CJmmaron Facility, Kcrr-McGec Corp.
Oregon State Univ.
Pacific Northwest Laboratory
Wcslinghouse Electric Corp.
Todd Shipyards Corp.
Combustion Engineering, Inc.
General Electric Co.
Westinghouse Electric Corp.
PRge
336
336
336
336
336
337
337
338
338
338
341
341
341
34)
342
342
342
342
342
342
343
343
343
343
344
344
344
344
344
344
345
345
XIV
Docket Mama
70-1 151 Westinghouse Electric Corp.
70-1 177 Davis & Elkins College
70-1193 Cimarron Facility, Kerr-McGec Corp.
70-1201 UF-6 Conversion Facility,
Babock & Wilcox Co.
70-1220 General Electric Co.
70-1252 Edlow International Co.
70-1257 Mixed Oxide Fabrication Plant,
Exxon Nuclear Co., Inc.
70-1278 Public Service of Colorado
70-1308 Morris Operations, General Electric Co,
70-1309 Morris Operations, Sources & Standards,
General Electric Co.
70-1319 U.S. Nuclear, Inc.
70-1333 Metropolitan Edison Co.
70-1359 1RT Corp.
70-1489 Goodyear Aerospace Corp.
70-1738 Pacific Gas & Electric Co.
70-1739 Tri-State Motor Transit Co.
70-1869 Radiation Management Corp.
70-2000 Mt. Sinai Hospital, Hartford, CT
70-2153 United Nuclear Corp.
70-2175 United Nuclear Corp.
70-2375 Pacific Gas & Electric Co.
70-2478 Transnuclear, Inc.
70-2574 Carlisle Hospital, Carlisle, PA
70-2609 Commonwealth Edison Co.
70-2623 McGuire Spent Fuel Pool, Duke Power Co.
70-2651 Manchester Memorial Hospital,
Manchester, CT
70-2838 Cincinnati Gas & Electric Co.
70-2860 South Carolina Electric & Gas Co.
70-2885 Commonwealth Edison Co.
70-2902 North Memorial Medical Center,
Minneapolis, MN
Page
Docket
346
70-2909
346
70-2910
346
71-0002
347
71-0005
347
71-0017
347
71-0082
347
71-0109
71-0121
348
71-0139
348
71-0143
348
71-0170
348
71-0173
348
71-0179
349
71-0189
349
71-0192
349
71-0221
349
71-0249
349
71-0251
349
71-0252
349
71-0271
349
71-0346
350
71-0368
350
71-0370
350
71-0371
350
71-0381
350
71-0383
350
71-0384
350
71-0387
351
71-0389
351
71-0391
351
71-0392
Name Page
Wcstingliouse Electric Corp., 351
Power Systems
Tennessee Valley Authority 351
Chcm-Nuelear Systems, Inc 351
Magnaflux Corp, 351
Rhode Island Atomic Energy Commission 351
Kerr-McGee Nuclear Corp. 351
Union Carbide Corp. 351
Neutron Products, Inc. 351
Tulsa Gamma Ray, Inc. 352
Ranchers Exploration & Development Co, 352
General Electric Co. 352
Battelle-Pacific Northwest Laboratory 352
Nuclcai Containers, Inc. 352
Tocld Shipyauls Corp 352
Nuclear Packaging, Inc, 352
All is Chalmers Corp. 352
Nuclear Fuel Services, Inc. 352
Westingliousc Electric Corp. 352
Dayton X-Hay Co. 352
Ridilialgh, Eggcrs & Associates 352
Public Service Co. of Colorado 352
Branch Ratliographic Laboratories 352
Amcrsham Corp. 352
Model: NNFD-IO, Unified Nuclear Corp. 3S2
E,L. Conwcll & Co ' 352
Model: NLI 1/2 LWT Cask, 353
NL Industries, Inc,
New England Nuclear Corp. 353
Massachusetts Materials Research, Inc. 353
Univ. of Georgia 353
Dept. Of the Navy 353
Baker Testing Services, Inc. 353
XV
Docket Nnme
71-0393 AlHs-Clialmers Corp.
71-4824 Model: HA-IO, Babcock & Wilcox Co.
71-4888 Model: Sentincl-25A, B, C, C3, D, E, F,
Teledyne Energy Systems
71-4986 Model; RA-2, Exxon Nuclear Co., Inc.
71-5088 Model: D34710-1, U.S Nuclear, Inc,
71-5341 Model: NFP-55, Babcock & Wilcox Co
71-5450 Model: RCC-I, -2, -3, Westinghousc
Electric Corp.
71-5607 Model: GE T-2, General Electric Co.
71-5768 Model: BB-250-2, Combustion
Engineering, Inc.
71-5862 Model: SenlmcMOOF,
Teledyne Energy Systems
7J-5926 Model: 100, General Electric Co.
71-5942 Model; GE-700, General Electric Co.
71-5957 Model: BMI-I, Dept. of Energy
71-5971 Model: GE-200, General Electric Co.
71-5979 Model: 5979. Alpha-Omega Services, Inc.
71-5980 Model; GE-600, General Electric Co.
71-5998 Model: GE-400, General Electric Co.
71-6078 Model; 927 Al &C1, Combustion
Engineering, Inc.
71-5144 Model: 6144, Nuclear Engineering Co.
71-6294 Model: UNC-2901, Combustion
Engineering, Inc.
71-6375 Model: PD-1, Chcm-Nuclear Systems, Inc.
71-6387 Model: 60, Baitclle Memorial Institute
71-6400 Model: Super Tiger, Wesiiiighouse
Flectric Corp.
Valley
iric Co.
Page
Docket
351
71-6698
353
71-6717
353
71-9009
71-9010
353
71-9015
353
71-9016
354
71-9018
354
71-9019
354
71-9022
354
71-9027
354
71-9030
354
71-9032
354
71-9033
354
71-9035
354
71-9039
354
71-9044
355
71-9049
355
71-9053
355
71-9070
355
71-9080
355
71-9081
355
71-9094
355
356
71-9096
356
71-9108
71-9130
356
71-9132
356
71-9136
356
71-9139
N anic Page
Model: NFS-4, Nuclear Fuel Services, Inc 356
Model. 6717 B 356
Model: FL 10-1, General Filectuc Co. 356
Model: NU-l/2, NL Industries, Inc 356
Model. TN-8, Transnuclear, Inc. 356
Model' TN-9, Transnuelear, Inc 35fi
Model: IJU-6, General Electric Co 357
Model: 11U-7, General Electric Co. 357
Model: CE-250-2, Combustion 357
Engineering, Inc
Model: 741, Technical Operations, Inc 357
Model: Scntinal-8, 3, & MW-3000, 357
Tclcdync Energy Systems
Model: 650, Technical Operations, Inc 3'57
Model: 660 & 660E, Technical 357
Operations, Inc.
Model: 680, Technical Operations, Inc. 357
Model: 715, Technical Operations, Inc. 357
Mode]: GE-1600, General Electric Co. 357
Model: GE-500, General Electric Co. 357
Model: 683, Technical Opei aliens, inc. 357
Model; N-55, Depl. of Energy 358
Model: HN-600, Hittman Nuclear 358
& Development Corp.
Model: CNSI-160Q, Chem-Nuclear Systems, 358
Inc.
Model: CNSI-14-195-H, Chcm-Niicleai 358
Systems, Inc.
Model: CNSI-21-3QO, Chem-Nuclcar 358
Systems, Inc.
Model: AL-33-90, Atcor, Inc. 358
Model: NP-50-XXL, Nuclear Packaging, 358
Inc.
Model: T-3, Nuclear Packaging, Inc. 358
General Electric Co, 358
Model: GE-589, General Electric Co. 358
XVI
ALPHABETIC ARRANGEMENT OF DOCKET 50 ITEMS BY FACILITY NAME
Name
Aerotest Radiography & Research
Reactor
Aliens Creek Nuclear Station, Unit 1
Aliens Creek Nuclear Station, Unit 2
Arkansas Nuclear One, Unit 1
Arkansas Nuclear One, Unit 2
Army Materials Research Reactor
Duane Arnold Energy Center
B-SAR-205
Babcock & Wilcox Co. Critical Facility
Hnbcock & Wilcox Co. Test Reactor
Bnilly Geiiciating Station
Bitrnwell Reprocessing Plant
Beaver Valley Power Station, Unit 1
Beaver Valley Power Station, Unit 2
Bellcfontc Nuclear Plant, Unit I
Bellefonte Nuclear Plant, Unit 2
Bernau Nuclear Station, Switzerland
Big Rock Point Nuclear Power Plant
Black Fox Station, Unit 1
Black Fox Station, Unit 2
Braidwood Station, Unit I
Braidwood Station, Unit 2
Browns Ferry Nuclear Power Station,
Unit 1
Browns Ferry Nuclear Power Station,
Unit 2
Browns Ferry Nuclear Power Station,
Unit 3
Brunswick Steam Electric Plant, Unit !
Docket
Pnge
50-228
37
50-466
292
50-407
294
50-313
131
50-368
226
50-47
1*
50-331
177
STN-50-561
333
50-13
16
50-99
20
50-367
225
50-332
179
50-334
181
50-412
259
50-438
270
50-439
271
50-273
77
50-155
22
STN-SO-556
332
STN-5 0-557
333
50-456
285
50-457
287
50-259
55
50-260 58
50-296 U2
50-325 161
Nnme
Brunswick Steam Electric Plant, Unit 2
Byron Station, Unit 1
Byron Station, Unit 2
Caltoway Plant, Unit 1
Galloway Plant, Unit 2
Calvcrt Cliffs Nuclear Power Plant,
Unit I
Calvert Cliffs Nuclear Power Plant,
Unit 2
Caorso Nuclear Station, Italy
Carroll Facility I
Carroll Facility II
Catawba Nuclear Station, Unit I
Calawba Nuclear Station, Unit 2
Catholic Univ. of America Research
Reactor
Cherokee Nuclear Station, Unit 1
Cherokee Nuclear Station, Unit 2
Cherokee Nuclear Station, Unit 3
Clinch River Breeder Reactor
Clinton Power Station, Unit 1
Clinton Power Station, Unit 2
Columbia Univ. Research Reactor
ComHnche Peak Steam Electric Station,
Unit 1
Comanche Peak Steam Electric Station,
Unit 2
Donald C, Cook Nuclear Power PJant,
Unit 1
Donald C. Cook Nuclear Power Plant,
Unit 2
Docket Pnge
50-324 159
50-454 283
50-455 284
STN -50-483
297
STN-50-486
300
50-317
136
50-318
139
50-378
235
50-599
336
50-600
336
50-413
260
50-414
261
50-77
20
STN-50-491
304
STN-50-492
305
STN-50-493
305
50-537
326
50-461
290
50-462
291
50-208
30
50-445
277
50-446
280
50-315
133
50-316
135
xvii
Name
Cooper Nuclear Station
Cornell Uiuv, Research Reader
Cornell Univ. Zero Power Reactor
Crystal River Nuclear Plant, Unit 3
Uavis-Besse Nuclear Power Station,
Unit 1
Davis-Besse Nuclear Power Station,
Unit 2
Davis-Hesse Nuclear Power Station,
Unit 3
Diablo Canyon Nuclear Power Plant,
Unit 1
Diablo Canyon Nuclear Power Plant,
Unit 2
Douglas Point Nuclear Station, Unit 1
Douglas Point Nuclear Station, Unit 2
Dow Chemical Co.
Dresden Nuclear Power Station, Unit 1
Dresden Nuclear Power Station, Unit 2
Dresden Nuclear Power Station, Unit 1
Erie Nuclear Plant, Unit 1
Erie Nuclear Plant, Unit 2
Joseph M. Farley Nuclear Plant, Unit I
Joseph M. Farley Nuclear Plant, Unit 2
Enrico Permi Atomic Power Plant,
Unit 2
James A. Fitzpatrick Nuclear Power
Plant
Floating Nuclear Plant
Florida West Coast Nttclear Group, Inc.
Forked River Nuclear Station, Unit 1
Fort Calhoun Station, Unit J
Fort St. Vrain Nucleai Generating
Station
Fulton Generating Station, Unit 1
Fulton Generating Station, Unit 2
General Atomic Co.
Pocket
Page
50-208
114
50-157
25
50-97
20
50-302
117
50-146
201
50-500
312
50-501
312
50-275
77
50-321
157
50-448
282
50-449
282
50-264
63
50-10
13
50-237
37
50-249
45
STN-50-580
335
STN-50-58]
335
50-348
205
50-364
219
50-341
196
50-333
179
STN-50-437
269
50-152
22
50-363
2)9
50-285
92
50-267
67
50-463
291
50-464
292
50-89
20
Name
General Atomic Co.
General Electric Test Reactor
General Electric Test Reactor
General Electric Nuclear Test Reactor
Georgia Institute of Technology
Research Reactor
Georgin Tech Research Reactor
Robert Emmet Ginna Nuclear Plantf
Unit 1
Grand Gulf Nuclear Station, Unit 1
Grand Gulf Nuclear Station, Unit 2
Greene County Nuclear Power Plant
Greenwood Energy Center, Unit 2
Greenwood Energy Center, Unit 3
Haddam Neck Plant
Sliearon Harris Nuclear Power Plant,
Unit J
Shearon Harris Nuclear Power Plant,
Unit 2
Shearon Harris Nuclear Power Plant,
Unit 3
Shearon Harris Nuclear Power Plant,
Unit 4
Hartsville Nuclear Plant, Unit I
Hartsville Nuclear Plant, Unit 2
Hartsvifle Nuclear Plant, Unit 3
Hartsville Nuclear Plant, Unit 4
Edwin I. Hatch Nuclear Plant, Unit 1
Edwin I. Hatch Nuclear Plant, Unit 2
Haven Nuclear Plant, Unit 1
Hope Creek Nuclear Station, Unit 1
Hope Creek Nuclear Station, Unit 2
Humboldt Bay Power Plant, Unit 3
Idaho State Unlv, Research Reactor
Indian Point Station, Unit 1
Indian Point Station, Unit 2
Docket Page
50-163 25
50-70 19
50-754 336
50-73 19
50-160 25
50-276
50-244
50-416
50-417
50-549
50-452
50-453
50-213
50-400
50-401
50-403
STN-50-518
STN-50-519
STN-50-520
STN-50-521
50-321
50-366
STN-50-502
50-354
50-355
50-133
50-284
50-3
50-247
79
39
262
264
330
283
283
30
248
250
50-402 252
254
316
317
318
319
152
221
312
210
211
21
92
12
43
XVIH
Name
Indian Point Station, Unit 3
Iowa State Umv Research Reactor
Jamesport Nuclear Station, Unit 1
Jamesporl Nuclear Station, Unit 2
Kcwaunee Nuclear Power Plant
Ko-Ri, Units 3 & 4, Korea
La Crosse Boiling Water Reactor
LaSalle County Station, Unit 1
LaSalle County Station, Unit 2
Limerick Generating Station, Unit 1
Limerick Generating Slalion, Unit 2
Lockheed Aircraft Corp.
Maine Yankee Atomic Powei Plant
Manhattan College Research Reactoi
Marble Hill Nuclear Station, Unit 1
Marble Hill Nuclear Siation, Unit 2
Massachusetts Institute of Technology
Research Reactor
William B. McGiiire Nuclear Station,
Unit I
William B. McGuire Nuclear Station,
Unit 2
McMaster Univ. Research Reactor
Memphis State Univ. Research Reactor
Michigan State Univ. Research Reactor
Midland Plant, Unit 1
Midland Plant, Unit 2
Midwest Fuel Recovery Plant
Millstone Nuclear Power Station,
Unit 1
Millstone Nuclear Power Station,
Unit 2
Millstone Nuclear Power Station,
Unit3
Montague Nuclear Power Station,
Unit 1
Docket
50-286
50-116
SPN-50-516
STN-50-517
50-305
50-594
50-409
50-373
50-374
50-352
50-353
50-236
50-309
50-199
STN-50-546
STN-50-S47
50-20
50-369
50-370
50-67
50-538
50-294
50-329
50-330
50-268
50-245
Page
94
20
315
316
121
335
256
232
233
206
208
37
125
27
327
328
16
228
230
19
327
109
172
174
68
41
50-336 186
50-423 267
50-496 306
Name Docket PHJJC
Monlagne Nuclear Power Sdilion, 59-497 306
Unit 2
Moncicello Nuclear Gcneiating Plant 50-263 61
National Bureau of Standaicls Reactoi 50-184 26
National Naval Medical Center 50-170 26
NEP Nucleai, Unit 1 SFN-50-568 335
NEP Nuclear, Unit 2 SFN-50-569 135
New Haven, Unit I SIN-50-596 336
New Haven, Unit 2 STN-50-597 336
Nine Mtle Poinl Nuclear Station, 50-220 35
Unit I
Nine Mile Point Nuclear Station, 504IO 258
Unit 2
North Anna Power Slalion, Uml I 50-338 1 88
Noilh Anna Power Station, Unit 2 50-339 1 91
North Anna Power Station, Unit 3 50-404 255
North Anna Power Siation, Unit 4 50 405 256
North Carolina Slate Univ. PULSTAR 50-297 1 14
Reactoi
Norllt Carolina State Univ, Research 50-1 1 1 20
Reactor
North Coast Nuclear Plant, Puerto Rico 50-376 235
Nuclear Examination Reactor 50-375 235
Oconec Nuclear Station, Unit I 50-269 68
Oconee Nuclear Station, Unit 2 50-270 70
Oconec Nuclear Slalion, Unit 3 50-287 97
Ohio Stale Univ. Research Reactor 50-150 22
Oregon State Univ 50-106 20
Oregon State Univ. Research Reactor 50-243 39
Oyster Creek Nuclear Powci Plant 50-219 32
Palisades Nuclear Plant 50-255 52
Polo Verde Nuclear Siation, Unit 1 STN-50-52* 321
Polo Verde Nuclear Station, Unit 2 S TN-50-529 323
Palo Verde Nuclear Station, Unit 3 STN-50-530 325
Palo Verde Nuclear Station, Unit 4 STN-50-592 335
XIX
Maine
Palo Verde Nuclear Station, Unit 5
Peach Bottom Atomic Power Station,
Unit I
Pcaeti Bottom Atomic Power Station,
Unit 2
Peach Bottom Atomic Power Station,
Unit 3
Pebble Springs Nuclear P3anth Unit I
Pcbbfc Springs Nuclear Plant, Unit 2
Pennsylvania State Univ. Research
Reactor
Perkins Nuclear Station, Unit 1
Perkins Nuclear Station, Unit 2
Perkins Nuclear Station, Unit 3
Perry Nuclear Power Plant, Unit I
Perry Nuclear Power Plane, Unit 2
Phipps Bend Nuclear Plant, Unit 1
Phipps Bend Nuclear Plant, Unit 2
Pilgrim Nuclear Power Station, Unit I
Pilgrim Nuclear Powci Station. Unit 2
Point Beach Nuclear Plant, Unit 1
Point Beach Nuclear Plant, Unit 2
Prairie Island Nuclear Station, Unit I
Prairie Island Nuclear Station, Unit 2
Purdue Umv. Research Reactor
Qnad-Cilics Station, Unit I
Quad-Cities Station, Unit 2
Rancho Seen Nuclear Generating
Station
Reed College Research Reactor
Rhode Island & Providence
Plantations AEC
River Bend Station, Unit I
River Bend Station, Unit 2
H.D. Robinion Plant, Unit 2
Docket
Page
STN-50-593
335
50-171
26
50-277
80
50-278
82
50-514
314
50-515
315
50-5
13
STN-50-488
302
STN-50-489
303
STN-50-490
304
50-440
272
50-441
273
STN-50-553
330
STN-50-554
331
50-293
107
50-47 1
294
50-266
65
50-301
115
50-282
90
50-306
123
50-182
26
50-254
50
50-265
63
50-312
129
50-288
99
50-193
26
50-458
288
50-459
289
50-261
60
Name
RPI Critical Experiment
Salem Nuclear Generating Station,
Unit I
Salem Nuclear Generating Station,
Unit 2
San Onofre Nuclear Station, Unit I
San Onofre Nuclear Station, Unit 2
San OnoTrc Nuclear Station, Unit 3
Seabrook Nuclear Station, Unit 1
Seabrook Nuclear Station, Unit 1
Seabrook Nuclear Station, Unit 2
Sequoyah Nuclear Plant, Unit 1
Sequoyali Nuclear Plant, Unit 2
Shoreham Nuclear Power Station
Skagit Nuclear Power Project, Unit I
Skagit Nuclear Power Project, Unit 2
South Texas Project, Unit I
South Texas Project, Unit 2
Space Radiation Research Reactor
State Univ, of New York Research
Reaetor
Sterling Power Project, Nuclear,
Unit ]
St. Lucic Plant, Unit 1
St. Lucie Plant, Unit 2
Virgil C, Summer Nuclear Station,
Unit 1
Sundescrt, Unit 1
Smulesert, Unit 2
Surry Power Station, Unit 1
Surry Power Station, Unit 2
Stisquermnna Steam Electric Station,
Unit 1
Susquehanna Steam Electric Station,
Unit 2
Docket
Page
50-225
36
50-272
75
50-311
127
50-206
27
50-361
215
50-362
217
50-340
196
50-443
275
50-444
276
50-327
163
50-328
169
50-322
156
STN-50-522 •
320
STN-50-523
321
STN-50-498
306
STN-50-499
309
50-187
26
50-57
18
STN-5 0-485
300
50-335
183
50-389
241
50-395
244
50-582
335
50-583
335
50-280
85
50-28!
88
50-387
236
50-388
239
XX
Name
Texas A&M Umv, Research Reactoi
Texas A&M Umv Research Reactor
Three Mile Island Nuclear Station, Unit I
Three Mile Island Nuclear Station, Unil 2
Trojan Nuclear Plant
Turkey Point Plant, Unit 3
Turkey Point Plant, Unit 4
Tuskegee Institute Research Reactor
Tyrone Energy Park, Unit I fr
UCLA Training Reactor
Union Carbide Research Reactor
Univ. of California at Irvine
Research Reactor
Umv of California at Santa Barbara
Research Reactor
Umv. of California Research Reactor
Univ. of Florida Training Reactor
Univ. of Illinois LOPRA Research Reactor
Univ. of Illinois Research Reactor
Univ. of Lowell Reseat ch Reactor
Univ. of Maryland Research Reactor
Univ. of Michigan Research Reactor
Univ. of Missouri Research Reactor
Univ. of Missouri Research Reactor
Univ, of Oklahoma Research Reactor
Univ. of Virginia Cavalier Reactor
Univ. of Virginia Research Reactor
Univ. of Washington Research Reactor
Univ. of Wisconsin Research Reactor
Docket
Page
50-59
19
50-128
21
50-289
99
50-320
141
50-344
197
50-250
47
50-251
49
50-406
256
STN-50-484
282
50-142
22
50-54
18
50-326
163
50-433
269
50-224
36
50-83
20
50-356
213
50-151
22
50-223
36
50-166
25
50-2
12
50-123
20
50-186
26
50-112
20
50-396
246
50-62
19
50-139
22
50-156
25
Name
U.S Geological Survey Research Reacior
Vernionl Yankee Nuclear Power Station
Virginia Polytechnic Institute Tiainmg
Reactor
Alvin W. Vogtle Nuclear Plant, Unit I
Alvin W Vogtle Nuclear Plant, Unit 2
Waller Reed Research Reactor
Washington State Univ. Research Reactor
Waterford Generating Station, Unit 3
Watts Bar Nuclear Plant, Unit 1
Watts Bar Nuclear Plant, Unit 2
Weslingliousc Critical Experiment
West Valley Reprocessing Plant
West Virginia Univ. Research Reactor
Wolf Creek Generating Station
Worcester Polytechnic Institute Research
Reacior
WPPSS Nuclear Project, Unit 1
WPPSS Nuctear Project, Unit 2
WPPSS Nuclear Project, Unil 3
WPPSS Nuclear Project, Unit 4
WPPSS Nuclear Project, Unit 5
Yankce-Rowe Nuclear Power Station
Yellow Creek Nuclear Plant, UniE 1
Yellow Creek Nuclear Plant, Unit 2
William H. Zimmer Nuclear Station, Unit 1
Zion Nuclear Power Station, Unit I
Zlon Nuclear Power Station, Unit 2
Deckel
I'agc
50-274
77
50-271
73
50-124
21
50-424
267
50-425
268
50-135
22
50-27
17
50-382
235
50-390
242
50-391
243
50-87
20
50-201
27
50-129
21
SI N-5 0-482
294
50-134
22
50-460
289
50-397
246
STN-50-5Q8
312
50-513
313
STN-50-5Q9
313
50-29
17
STN-50-566
333
STN-50-567
334
50-358
213
50-295
109
50-304
119
XXI
LOW LEVEL RADWASTE DISPOSAL SITES
7-010 QEATTY, NV
BOQM10736 t-oruiards Waste Pflctagiiig Insp Kept QO-2Q on B0012B-02O1 of
activities undei License 19-17(139-01 Ho nnncomp 1 lance noted
SMITH, G II Region 1. Phi ladcl ph la. Office of the Director
BO/04/24 Ip
8007070012 Transcript of B00626 prehearing conference in Peorla.lL Pp
113-173 Morning session
• Atomit Safety and Licensing Board Panel HO/06/2A dOpp
0007130058 Submits issues to be litigated In waste disposal site
procaBdlngi per ASLO (100626 prehearing conference directive
fluestions NRC 79032O order re absence of jurisdiction over
entity no longer in possession of radioactive matl
CONNER- T D Conner' Moore It Corber BO/07/OB 3ff
— BO06110739 Waato P-icfcaglng ins|i Rept BO-BO on SQ012B-0201 No
noncnmp 1 iancp nolod Major arudii inspected iiiaato shipments &
pac kagos, vein L 1 1> placarding, packaging ccnditinni & labels
B0QK,H E Hegiuri Si Ban Frnnciscn. Fuel Facility !i Materials
Safety Branch BflGUNE. U 0 Advanced Fuel (. Spent Fuel Licensing
Branch THOMAS. R D Region 5. San Francisco, Qfflte of tho
Director QO/O3/31 lOpp
B0070202Q2 Renuests i nnti i derjt ion uf having Atomic Energy Council of
Taiwan visit Facilities or. H0072H-C30 tat nichland) (, £100731-
OBO1 (at GBHtty) Council interested in obsoivltlg maatc
mg t activities
LAFUEUR. J D Assistant Director for Intor-natlonal Cooperation
4pp
8007MOi.S3 Forwards Wobte Packaging Inap Refits 13000027/BO-31,
iaOOOOa7/BO-3D (. l'i000027/BO-17 on 000319,21 ti OflO?
SMITH, Q H Region 1, Philddol ph U, Fuel Faciliti) (.Materials Safety
Branch 00/OS/ai 2pp
8007230957 Submiuoiona at issues to bo litigated In prot Bed Ing. in
rosponse to ASLD HOOdSA order QueBtions illeo,alitg of
license terninatlon prior to determination of necessity of
site malnt f-ar health d safety Cartiflcate op Bvc encl
SCOTT! W J . SEWULER.9 N Illinois, Qtato of BO/07/ It Spp
B00723O149 Submits ins net to be litigated in 1 oui level radua-ste
disposal site proceeding in response to ASLB B00h3i,
directive Urges adoption of liability issue along in/
technica-l issues N/site stabi 1 i ration ti cloiure condi
LEGSY.R P Antitrust Division BO/07/17
nditions
QQ07350443 Drifff urging dismiSEal of appeal due to Chicago Section of
AN 3 untimelij Biceptions to ABLD 790503 nrdor Appeal doas not
nsfiert distHrnlble injurg No F.IB required since order doe*
not affect environ H/appearancc & Ccrti f icotes of Sve
SCOTTiW J . SEKULER, S N . MUHRAV, M J IlllnolG, Bbate of SO/07/SO
SOpp
—8007140697 Waste Packaging Insp Rept I50QQ027/BO-31 on B00321
None omp ] lance noted bottom nf uinoden boi for Bolld scrap
containing U-23H uias pulled auiay, reveal ing contents
DQDK.H E Region 1, Ph i laJu Iphla, Fuel facility & Materials Safety
Branch THOMAS. (1 D . ULIDLINUCH. B A Region I. Philadelphia,
Office oF the Director BQ/O4/I3 3pp
—8007140663 Waste I'.ickaglng Insp Rppt IHOOOO27/BO-3B on B00321
Noncomp 1 iance noted side <jf tuooden <>i» containing solid
scrap contaminated iu/u-33£i iu<iB pulling Quay from rest of
container eipii&ing plastic hag in 51 (It1 tax
DODK.M E Jlpgion 1. Philadelphia. Fuel Facility (.Materials Saffltu.
Dranch THOMAS, Ft I) , RC1DLINOCR, Q A (legion 1, Philadelphia,
Office of the Dirpctor 00/04/13 3pp
--B0071406/0 Waste Packaging Insp llnpt ISOOO027/BO-47 on B00409
Noncompl lantu noted Drum 40. containing depletoif U, found
leaking t< tr.innpurt velilrto not prnpurlij placarded aa
radioactive eh i pment
BOOK.H C Region 1. Phi Indolph Ia, Fuel Facility Ji Materials Befety
Branch THOMAS. H D , ZURAKQUQKI, P R Region 1. Philadelphia,
Office of the Director 00/04/30 12pp
B007I70543 Forwards Wnsta Packaging Insp Re-nt 13000027/00-46 on B003B9
b notice of violation
DAVIS, A n Region 3, Chicago, Fuel Facility Ei Materials BaFutij
Branch HO/06/10 2pp
--B007170B50 Notice of violation from map on OOQ3J7
» Region 3, Chicago, Office of thl' Director 00/04/2B Ip
G007310133 Corrected Page B to State of JL 800721 brief Includes addl
uior-d ing correc ti ons
BEKULEfi.a M Illinois, State of BO/07/29 Spp
DOCKET 27-047 BARNWELL- BC , CHEM-NUCLEAft SYSTEMS
B00701O2B5 Forwards IE Haste Packaging Insp Rept 13O00039/SO-03 an
BOO a 37- E 9 No none omp 1 iance noted
QMI1II, 0 H Region 1, Philadelphia, Fuel Facility J, Material* Safety
Branch 00^04/24 Spp
— Q007010291 IE Waste Packaging Inap Hop* 1SOOD039/B-0-03 on BOOa27-29 Hn
noncomp 1 lane e noted Major areas Inspected shipping paper
rBnuirementi, DDT placarding renuirantDnti, radiati on leveli>
removable eontomina tion & external package featur-ti
PEEHV.M H , POTTER. J P Region 2. Atlanta. Fuel Facility it
Materials Safety Branch BO/03/1G, 7pp
B0070 10277 Forwards IE Uastn Packaging lisp Ropt 15O00039/BO-03 on
900227-27 Ma mine ompl iance noted
SMITHS H Region t. Philadelphia, Fuel Facility I< Materials Bafetu.
Branch, BO/04/34 Ip
— -90070103Oii IE Waste Packaging Insp Hept 1S000039/BO-O3 on 800327-29 No
nuncompl lance notud Major areas insp«ttBi! ihipping paper
reqUirementsj DD7 placarding requirements, rad iati an level*,
removatlo c on t ami nation & eiternal package features
PEERV.W W , POTTEII,J P Region 1, Philadelphia. Fi»el Fae i U tij b
Materials SaPety Branch BO/03/ 18 7pp
-B00717O3B6 Wastu Packaging Insp Rept 150000a7/eo~4<b on B00229
Noncomp 1 lanco noted no placard on shipment boies
DCCHEH.T . fHOMAB.H D llegion 5. San Francisco. Office of the
Director TiOOK.H E Region 5. 9an Trancisto, Fuel Facility A
Materials Safntij Branch BO/04/^0 6pp
BOD70201B9 Raquents conoi deration of having Atomic Energy Council af
Taxman visit facility on 800901-03 Council interested in
observing wast? mg t activities Cooperation uf 1 1 be major
contribution to NRC exchange arrangement
LAFLEUfi'J D Assistant Director for International Caapiration
00/03/13 3pp
DOCKET 27-039 SHEFI 1ELD, II, , NUCl.tAR &NIJINEFR1NO CO
B007070030 Notifies licensee thai independonl. contractor will visit
site tu obtain info relative to facility
MARTIN. 0 B Division of Ujdle Management 60/06/13 Ip
8007030760 Faruards BOOB27-28 trip rept Chem-Nuclear brief e« State of
BC b NRC personnel ro preliminary sito stabil i ration fc
closure plan Current conditions b practices at tit* were
ob served
DRAQDNETTE, H. S Lou Level Haste Licensing Branch BO/0 fa/20 tpp,
DOCKETED ITEMS
7a<7O3'93 Forwards Waste Packaging Insp Rept 1 SG0003?/HO~-2 1 on 600128
0501
'REILLV.JP Region 2. Atlanta. Office of the Director BO/OA/2O
PP
007S90401 Waste Packaging Insp Rept 1500<>03<?/Bu-2:l on B0042B I, O3O1
Nancojnpliance noted radiation levels on (surface of closod.
exclutive Die vehicle in eitDss of regulatory limits
TROUP.O L , PEERY.U W Region B. Atlanta, Fuel Futility &
Materials Safety 13 ranch BO/Ob/SQ 4pp
— B007I6073I Waste fan I; .19 my Isi5p Rcpt ! 5QQQ04t>fBQ-Ob on B00515
Nancumpl i iince noted drum containing rsJuasti? fDUTiil to have
gaEhp * ipusing tardboiird 01 similar solid mat!
BQDH.H E RetjiDi5 5< San franc i BC o, Fuel Facilitg t: Materials
Safety Dranctl THOMAS. R t) Region 5, ban Francisco. Office of the
Bireitor BO/06/10 5pp
000730057-5 Forwards Unste Paituging Insp Fie|it 1 9O0001(>/QO-O7 nn G001D1
Notice of violatiun forwarded under separate cover
HEPPLER.J O Region 3, Chicago, Office of the Director BO/06/J7
729O404 Forwards Uaste Pat bog ing Intfi R*pt 1 500003V/ 30-08 an
QO&03-O& No mancomji 1 ianc B noterf
TOHRi J P Region 3. Atlanta. Fuel Facility t< Materials Safety
ranch BO/06/2O 3pp
OQ7a9O41O Waste Packaging Imp Rapt 1 SOOO0037/UO-OB on B00603-CA No
noneoroji 1 iance noted Major areas inspei teif compliance u/DOT
tc NRC regulations
THDUP, Q L . MrtCARTHJJl.T C Region 3, Atlanta, Fuel Facility &
Materials Safety Branch BO/O6/2O <bpj
7300376 Forward's IE Inep Roatt 50-321/00-14 & 30-364/80-14 at)
00319tD429 & 30 Enforcement action discua&Bd in NRC 800619
tr
'REILLY, J P Region 2. Atlanta. Office of the Director BO/OJ./33
t
Q073005HQ BE Inap ReptS 5Q-3Sl/SO~i4 t. 50-3d6/Bf)-l4 on, 800319,0429 €<
30 Noncampl iance noted radiation levels an vehicle tab in
eicesffl of regulatory limits
STOHR.J P , UOODRUFF.R L Region 2. Atlanta. Fuol Facility &
Materials Safety Branch LftCEY, L H Region 2. Atlanta, Office of
tJi» Director BO/06/19 gpp
7DI04B3 Affidavit re support of request that Ch em-Nut 1 ear fijs. Inc
arumont ED-DP=Q-05, "Process Control Program for CM3I Mobile
olidif ication Unit a Ws-ing Dow Process," be withheld
ref lOCFflH 7101
EVNOLDS.L E Chem-Nue IHOT- Systems, Inc flO/G£/25 3pp
37-048 RICJJLAND, MA .NUCLEAR ENQ1NEER1NQ CD
7100O02 Farumrds Waste packaging Insp Hept 1 SOOOOIfi/HO-oa on
501Q7-1B Mo nrnicompl iance noted
1ITH.B H Rasion 1. Philadelphia. Fuel facility fc MateriaJs Safeby.
ranch, BO/Q3SS4 Sjip
—800730056^ Wast* PdckaflniB lns.p Rept 15OOO04ft/BO-07 nn B00131
None (imp 1 iance noted radiation levels on surface of trailer
in EICEEE of regulatory limits
DOOK>H f Region 5^ San Franc isc a, Fuel Fanlitg (e Material?
Safety Dranch CAIN, C L Rugjon 1. Dallas, OFfire of the
Dirocto'- BO/02/27 /pp
£1007310335 Foru^rds Haste Paclaglng Inap Kept 1 9000016/BO-3B on BQ0333
t. Sh
DAVIS, AD Region 3, Chicago, Fuel Facility t. Materials Safety
DTanch BO/O6/30 Hpp
— B00731O339 Uastc Fackflaing Insp Reft. 1 500OO4A/HO-J? on BOO222 t. 26
Nnncomp 1 iance u/OOT regulations noted mui dose rate on
surf act of transport trailer iun$ 2!JO ml 1 1 irem/h
O'REILLY. 1. A Rug ion 5. Ban Francisco, Office of the Director
THOMAS.fi O , DUOK, H E Region 5, San Fiancisco. Fuel Facility t.
Materials BaFctg Branch BO/O1/02 l^pp
B0072 30271 For-ktards draft Waste PacVage Insp Repts 15000046/8O-76 !<
13Q0O016/BO-77 on O006B3-37 fc corT05|JDnO ing NF1C-766 forms
AVI3, A B Region 3. Chicago, Fuel Facility ti Materials Safety
Drench BO/07/11 9pp
a0072a050a fiospondE to 800626 Itr ru possible noncompl iance ulentificd
during lou leve] Taduia-ste disposal sitf intp Hadua^te
container punctui-eii fluting tronsport Radioactive matl not
rolffasei! IntpectoTi briefeJ re tight container requirements
BAEIt, T S Nuclear Engineering Co , Int. . (sifbs of Telodgne, Inc >
DO/07/ IB lp
B0072?03SO PUO-V-BD-060 on B00723. Reg i on & oft was notified that Con Ed
luu level raduaste shipment uas not properly packaged Based
upon noncomplldnce, state of MA ticiv cancelled burial permit
t< banned util From use of site
THOMAS, R D ftegion 3. San Francisco, OfFite uf tfte Direttor
lp
307100003 Waste Packaging Insp Bept 1 300QQtb/BQ-W on BOOI07-1B No
noncomp 1 i ancH -noted Major areas Inspected waste s-lilpmenti
for compliance u/DQT b NRC regulations Including vehicle
placard ing, pac kage marking t> condition of packages
THOMAS, R D , PECK. C C Region t, Philadelphia, Office of the
Director BDDK H E Region 1, Phi ladclpji ia. Fuel Facility t<
Materials Safetg Branch ffQ/O3/25 7pp
'O2Q202 aequesti consideration of having Atomic Energv Council of
iluian visit facilities on 000728-30 (at RUhlnnd) d B00731-
01 (at Beatty) Council interested in nbseTVing waste
t activities
^FLEIJR, J D Assistant Director Fur International CoonEration
1/09/13 4pp
MlOfiO') Forwards JE In&p Repts 27-O04B/BO-OI t< 1 500016 / 77-36 on
30403 No noncompl iance noted
ITH.Q H Region I, Philadelphia, Fue) Facility t< Materials Safety
-anch BO/05/51 2pp
DOMESTIC LICENSING OF SOURCE MATERIAL
DDCHET 10-0215 H F APPLIANC.C. LTD
9007080036 Responds to JE BullDtin TV-W re shipraent of 1 on) level
raduaste End lists B0020B fihipmiinta nf 29 a'S-golliin I. 4fl
55-gallon drum& of low level mantle raduaste Further
shipments of ustte will ba plated in sealed ttepl lirums
JONEGEIN, B J 6 F Appliance, Ltd BO /Oft/ 16 Spp
UNIDN CAflBIDK CHIfP
S007310*?') "EobSlirfBte Invaati^at i un Clag Liner Mull EaEl Gas Hills,
WY "
RATIIDUN, E) O Inbprg-Miller fcnglnuBr ing Co SCl/03/IO 35pp
J07HO60B IE Inap Rept 37-0048/80-01 OTI S00il03 No nonccjnpUanco notad
rlajoi- areas imp DC ted trontp ortati on program
HOTH.J Region i, Ph i 1 adelpli la- Fuel Facility i, Materials Safety
Branch flO/04/25 5pp
)07140i,09 IE Insji Rept 1 50004fe/79~3h on 600403 No noncomp 1 iance noted
Major ai-sat Inspected Trailer fiB-193a
BODK.H E Region 1. Ph I ladpl phia, Fuel Facility t< Matanals Safetu
Branch 60/O2/B7 7pp
'li070O Foruiards Mante Packaging Insp Rept lS00004ii/BO-6-0 on BOOS15
notice of violation
tVIBjA B. Region 3, Chicago, Fuel Facility t< Mai*rials SaFetu
•anth BO /Ob/27 gpp
aoo7E902.31 "EubsurfaLO Invest Ration Clay Linur Eiplorntion East Hillt
UV. " f-or Union Carbide Corp
CORCORAN. T InLerg-Mi 1 1 or Lugunuenng CD SO/04/17 4Bpp
8007170571 roruartts design me ma t< ilTaunngs fur add! sprag evaporation
flyHj in Lumpliantd w/Contf ition 9 of Amend 13 to License
BUA-MB DraLflngs ovailablp in Centra) Filet nnly
MONO.T Union Carbide Carp f]O/Of>/04 Spp
B0073003/9 Foruiards "Field CompatUnn Test ReEultb," HOO609-1A
RAIHBUM, D J MiJltfr TcchniL^l Services BO/06/ IB lp
— H007300S85 "Flr-ld (.ompac
* Hiller Technical Be
Test Hosults," B00609-1&
e. SO/Ob/lB 23pp
10716O7[0 Notice of violation From insp on B00515
* Region 5, Sen Francisco. Office of thu Director BO/Od/10
lp
B00723-0307 De»crtb«<s Piold untv of proposed evaporation pond
das Hills site Ar«as inspected include cntlru trest of
proposed dam, toe of ea latins overburden, spoil pile on uihich
fond is being built, cnn&t & «C program
HANSON. MM Barr Engineering Co BO/O&/2S Spf
DOCKETED ITEMS
0007230357 FDIA request for three categories of info rfl NHC at
license requirements For Union Carbide. Qos Hills. UV U mill
facility
8ALZBERO.H Black Hills Alliance BO/06/30 Ip
B0070a044t Advises of need to increase amount of Wi 1 1 idms-Rob i net ti
contract due to eitensive ongoing murk Prompt attention will
be appreciated because of immediate nature oP matter
BCARANDi R A Uranium Recovery Licensing Branch BQ/06V04 Ip
B007300SBB Forwards "Field Compaction Teat Results," OOOA17-36
FIATHBUNi D >J Miller Technical Services SO/O6/30 Ip
— 80O730Q2B7 "Field Compaction Test Results,
» Millar Technical Services BO/O6/3O
00061 7-Si,
19pp
OQO7Q80219 Submits analytical results from samples token Prom tuiu
releases in restricted areas. to bo included as adfll data
for 80032B 1 tr
WANO, T Union Carbide Corp BO/07/O1 Ip
0007140371 Forwards A12-BQ- 23, "Soil Sample Location Mapi " as re-quired
uy Condition 7 of Bource Matl License BUA-64B, Amend 15 Map
a noun location DP areas affected by seepage from Sump C Map
available in Central Files only
WDNO, T, Union Carbide Corp 00/07/07 Ip
B007240021 "Magnetic Survey - Western Nut]
Impoundment. Jeffrey City, HY. 600605 "
« Wi 1 Mams-Rob motto (, As-soclates. Inc
Hi- Split Ruck Tailings
BO/06/12 17pp
00O71000BS Summary nf 000322 meeting iii/Ucatern Nuclear ti D'Appolonla
Consulting Engineers in Silver Spring, HI) re possible
etistence of debris layer underlying tailings embankment !t
removal of debris From dumji area
GARCIA, P J Uranium Recovery Licensing Branch BO/06/16 3pp
— BOQ71QQ09I Summary of BOQ522 meeting ui/Heatern Nuclear t< D'Appolonia
Consulting Engineers In Silver Spring, HD re possible
ailstonco of debris layer underlying tailings embankment tr
removal of debris from dump area
LINEMAN, J J Uranium Recovery Licensing Branch GQQDEN.C
Western Nuclear, Inc (subs Of Phelpfl Dodoe Corp ) flQ/OS/22
3pp,
— 0007140380 "Soil Sample Location Map." For East Gas Hills aroa. Natrona
County, MY
JAMES.H £ United Nuclear Corp SO/07/03 Ip
B 007320 363 Partial response to F01A request for three categories of
info re NRC source rnatl licensa r«([uirements for Union
Carbide, Gas Hills. HY U mill Facility forwards documents
lilted in App A Search For other documents, in progress
FELTDN.J M Division of Rules and Records BO/07/15 2pp,
—8007230248 Confirms telcon that NRC position re regulation of in situ U
extraction In HY remains at stated in OF Ahearne 000-123 1 tr
NRC Is prepared to accept HY in situ grounduater protection
requirements in HEP A analyses of associated FncilitiBt
BHAPARiH H Office of til a Eiecutlve Legal Directur BO/07/07
2pp
8007290263 Forwards rept describing magnetometer survey conducted by
NRC consultants at Western Nuclear, tnc Split Rod tailings
dam on BOOtOS W/o end
QAHCIA,P J Uranium Recovery Licensing Branch 80/06/20 Ip
B007220920 Amend to petition to intervene, Paragraphs b t, 27 re
utilization oF SueetuatBr River waters Pnr Educational It
recreational purposes b inaccuracy of FES
BDOKE.Q L Hyomlng Outdoor Council OOOKE. B L uoofcB.D L
Ip
BOO72S060O Submits comments re monitoring uoll locations (< design
NRC BOOt 04 request Oeologic description af Suieetuater River
Valley by RE Williams dtd 800430 !. WRC 000530 Itrs provide
considerable Impetus t consistency u/previous carnments
OIEDT. J R Envlronmentfll Protection Agency BQ/06/SS 3pp
— 6O07BH0273 DiacUBaes Governor's BOO-103 visit to discua* regulation of U
milling ti mill talllnga in MY MRC ulll not act on licemo
reneual until MY Dept of Environ Quality environ impacts
•valuation results are received & reviewed
AHEARNE. J F, CommUaion 80/O4/HB Hpp
WESTERN NUCLEAR- INC
B007O70099 Dlacucsoa 771003 onsit* viait to Split Rack mill ti mine
Photographa encl
PETERBONi R Western Nucleari Inc (subs of Phelpi Dodge Carp )
79/10/03 Bpp
G0062400B1 Faruard* tabulation of motor level readings from piezometers
in Sections A-A b B-B for 1979 to preflunt Also foruarrts
Drawing RM7B-670-EB Hliouing plots of plBiometer uator level
elevation* vs time from Jul 1977 to present
BAOBEN,0 We. turn Nuclear, Inc 80/05/33 £pp
B007230314 Forwards "Rept on Reinterprotatian OF Ground Magne to-melor-
Survey Data Western Nuclear Split Rock Tailings Impounilment
Jeffrey City, MY "
BOQDCN. 0 Wet turn Nuclear, Inc (subs of Phelps Dodge Corp )
00/06/30 Spp
— B0072S0317 "Re-pt on Reinterpretation of Gi-ound Magnetometer Survey
Data Western Nuclear Split Ruck Tailing* Impoundment
JoFfroy City, MY "
* Allan Spector J. AKEOC i ates, Ltd J231 BO/06/30 lOpp
8007300338 Order directing appointment oF ABLD to rule on MY Outdoor
Council intervention !• appointment of AHLAD to exorcise
Commission authority b functions
CHILK.S J Office of tho Secretary of tha CommlEsinn BO/O7/2B
DOCKET 40-1341 EDOEWNT URANIUM MINE, TVA tt MINES DEVELOPHENT, INC
-80D6B40082 "Pisiometar Data Shut " Figure 6-1
» D'Appolonia Consulting IJnplneorsi Inc, 79/01/19 Ip
BO 0707 00 43 Foruarils Revision 4 to decommissioning plan environ rept
MILLB.L M Tennessoe Valloy Authority BO/06/13 3pp
8007010861 Forwards, for revinu d commenti figure thawing proposed
location of grounduater monitoilng uelln Figure is mod to
Flgur* i 3 of FC8 Request* commtnti by BOD611
SCARANCLH A Uranium Recovery Uiconsing Branch BO/OS/30 3pp
BOO7010599 Forwards, f or ruvisu t* commenti figure showing proposed
location of grounduater monitoring wells Figure 1» mod to
Figure 6 3 of FES Riqueats commtnts uu BOOill
QCARANOiR A, Uranium ttecovinj Licensing Drancli 60/09/30 3pp
--B007010562 Respond* to r<r<l»esl for revl»y of FES In ordar to minimin
riBh of add) contamination caused by preferential mnvimont
of seepage along un known hlBli-p»rmeabll i ty pathway, Intensive
monitoring network shtiuieil bi inBtalled
HILLIAMB.R E Affiliation Unknown BO/04/03 Spp
B007010969 Diicussec review of const repl aubmlbted GD04OB fie quest!
addi info re survey results, settlement, pieiomBter ti pond
alBvation dattt by 600613 Plan vioui of ultn ahpuiinj final
disposal locations for debris required
LJNEHANiil J Uranium Recovery Licencing Branch 00/Oi/OH Ip
6007100449 Summary of BQOSOB moetino in Bethesda.MD re continuing
•afety revieu of series of raises to tailinfit dam
OARCIA.P Uranium Recavvru Licensing Branch SO/06/OB Spp
— S007070D43 Revision 4 to decommi ssi oninij plan environ rept '
* Tennessee Valley Authority BO/06/3O ISlpp
Q007240079 Amend 3 to Source Matl License SLJA-B16, changing Condition
16 allowing raceipt b storage of U mill tailing! tt mine
waste rock from offaite locations
6CARANO. R A Uranium Recovery Licensing Drench BO/Oi/04 Ip
BQQ7SS09Q3 Forwards affidavit certifying that on B00616 c orrn ipondsnce
re Edgemont U mill tfecommiasioning plan environ rept was
served on Individuals identified in attached list
MILL8,L M Tennessee Valley Authority QO/Ofi/23 5]ip
B0072101HO Enpresses concern re noncomfll lance ui/doee stris far local
residents noted in TVA BOO613 Itr Objects to TVA request for
variance from stds
OADLER.fi J Mlduiest Environmvntal Protection Association QD/0&/27
8007330094 Recommends rmllological survei) program for U mill tailing
activities Qrab working level measurements, (amma radiation
measurements, radon progeny integrating sampling unit t
engineering assessment should be implemented
EADIE.O 0 Uranium Recovery Licensing Branch BO/07/07 Spp
DOCKETED ITEMS
,KEI 40-1B52 FISHER SCIENTIFIC CO
17290102 IE Insp Findings t' Uirensee ftc k dtd 300529 of License*
'9-1O211-O1 f, SMH-OB01 Insp findings nn nontomp 1 1 ant e noted
F Region 1, Philadelphia, Office of the Director
lp
KET 10-2061 WEST CHRABD CftCILlT/. K£HH-Ml,Gf=E CGFIP
)71 100^5 Fnruards application for amend of License SIYi-533
HELLEy.W J Herr— McCue Corp BO/OS/3B lp
007)10037 Application For amend of Limns* STA-5Q3i au than i ing
installation of i nc i ne-vstnr to reduce voJ of comliuat I b 1 e
uia-ste at facility Incinerator iiii 1 1 bo equipped uf/NRC-
apprnveri effluent cleaning equipment
" Korr-NcQei? Corp 80/OS/2B llpp
i721Qloa Notifies oF th-on" mnilina .id dress Pur UflBt Chicago Facility at
TO Factory Street, West Chicago, II. (.0105
EMNY, I L Kuri--McQBB Chemical Corp Uubt of Kerr-McGeo Corp )
lp
7310-100 Summary of QOOAO5 meeting u/KBrr-McQee re -d Dcommi s*lon ing
on brae tor p erf ormanc e
IXQN.H A Uranium Fuel Licensing Branch BO/O7/1 1 3pp
73IOS71 Summary ot 80061(9 meetinfl u/vondnr in r.hiceflo. IL TS waste
laposal ;. cite decommi as i on ing
IXON.W A Uranium Fuel (.Iteming Ilranch BQ/O//15 4pp
cr 40-aaa? PATHFINDER MINES cottp
--B0070100&7 Rffquests. changes m provisions of License SUD-197 Authorized
location of use should be Mechanical Engineering D<?p-t lab on
Oltf Juniper Road Radioactive mail planned for usa in
graphite moderated sub-critical asaeml) ly
QrtY'MIt N&tm Dame. Ifrkiv oP A1/J2/2I lp
— 8007010077 Forwards response tn NRC 800513 I tr re none omp 1 lance
identified in SOOS13 Itr Cdna-ctivo' actions personal
author i ipti DTI of tritium For Investigator increased to 30
mCl on 790314 Internal c nrrespondencD *ncl
MAEDN.T J Notre &amB. Urjiv of BO/O5/29 33p p
— BOO7O100O3 ftppl icat Ion *or amerd to Item 14 of License 13-01933-OB,
deleting statements, prat adure s t representations madu in
previDuily submitted document! Internal corrnspondDr c a and
HrtSON, T J Notre Dame, Univ of BQ/QH/3B 9pp
— BOO70IO09I Application for Msneiual of eipired Source Matl Licunae
•CBA-'10B7i auttiori ling poBBessimi of 1,100 to natural U metal
NEWMAN. M K Notro Dams, Unlv of ii/04/IO 3pp
— OOO701001?? ffenueBts. mod of License Condition 14 permitting film badge
of course instructor to provide documented record of
poiilblD eiponure-
H Notre Dame, Univ of 90/03^30 Spp
HD07SJ0350 f\c k receipt of BQ0633 1 tr informing NRC of atopa taken to
correct violations identified in NRC 800409 i tr
KEPPLER.J 0 FtBDion 3, Chicago, OPPice of the Director BO/O7/10
lp
— 3007310538 R*spond« to NRC BOD609 Itr re violation noted in IE Insp ot
Licenie BUD-197 Correc ti "e actions responsible investigator
in charge of source matl advised mat] mil at be ui pa- tested
before u«e
MASON, T J Notre Dame. Univ of BO/Oi/23 2(ip
701O'J'13 Motifics that mads to leach circuit planned Feed ulll be
langud. ci-eatinu t"io tircuita in pfira 1 1 cl , eac h containing
> tanks In our 103 Tl oiu r.ite uill] remnin unchanged Nd
loinlPitant chuiijje to prcn.e6Eiufl procedure ruproaented
JGENT, E L PatJifinilel- Mines Corp eO/06y.S5 lp
23O131 Discusses Amend D to Licennn SUA-672, uih i c h would permit DHUL,
• obtain small tjuantitij o-f tatlinga solution from mine alto
, support oP studij re tfotoi 1 orat i on of clays due to acid
tack liecommcnd-B approval of amend
LLEN, D M ' LINtlfAN, J J Ur.iruum Uecovery Licensing Drdnch
lp
BOQ7ai03i9 Reque-sts amend to License SUB- 197 to delete six-month leak
testing requirement
MASQAT J Notro Dame. Univ oP BQJQb/33 Iff
DOCKET 40-2740 NL INDU8TJUEB, INC
0007140693 Foruarda Wante Psckaging Irsp Repts laOOOOa7/eO~31.
13QOQ027/BQ-33 t, 19000027/80-47 on B00319j SI & 0109
SMITH, 0 H Region I, Philadelphia, Fuel Facility b Matarials Bafetu.
Branch 00/03/21 app
'230171 nequpott that 1C conduct const Ineps oP addition to Tailings
banltm&nt •) Const authoriied by rtm^ndt 5 t< 7 to Lice-nee
A-672 Also requentB no t i fie otion of dates oil luhlch Insp
11 bo parformad J Kan« performed stability review
ARANO.Fi A Uranium n*tovorij Lictnaing Branch BO/Oi/HA Ipp
3SOI63 Act roceipt of Permit to Construct BO-13R far addition to
Itinfls Reservoir 1 Owner hnB removed Chtn E' Asanclaceo
"•m project
MME.K E Chen I, Associates- Inc BO/06/37 lp
C.T 40-2S6I zinrun PRDBIHITB. (.QRNING SLASG
-H007I40&37 Matte fncidging Insp Deo* 1 3000037/00-31 on
Noncompllance noted, bottom of umoden boi Por solid strap
containing U-23B iua* pulled auay, revealing contents
DDDK-H E RBSiun 1, Phi IflielpJi 1 a. Fuel Facility tr Materials Bafetu
Branch THOMAB.Fi D , HEIDUINOER, D A Ftegiun 1, Philadelphia.
Office of the Director BO/04/13 3pp
-8007 140dii3 Hsfcte PacknaitS Insp Rapt J &OQOOa7XBO-3a on BOO 32 1
Noncomp 1 ianiD notad side of ujondan box cantalnlno solid
scrap contaminated ia/\}-333 uas pulling auaij from rest of
container eiposin^ plastic bag Inside box
DGDK,M E Region 1, Philadelphia, Fupl Facility t< Ma tor la U Safety
Branch TIIDMAB.R D . ftEIOLlNQER, B A, Region I. Philadelphia,
DPfice of the Dirtetor BO/O1/15 3pp
290343 Respottifs to IE Bulletin 79- 11?, "Pa etas 1 ng of Lauj Level
duasto Par Transport & Duiisl " racllvti) is in process of
ing out of tJiol-ln business No matl sent for burial since
n» 1971
-CHEBKO.C H Corning Glass Works, Zii-coo Products Dw Bff/07/13
-0007140670 Was to Pacfcaglnff In»p Rept 15000037/00-47 on HO0409
MoncnmpHante noted Drum 40, con tiining depleted U, found
laaking & tr-anspnrt vehicle not properly placarded as
radioactive shipment
BQCW,H E Rnfflon 1, Philadelphia, Fu«l Facility It Materials Safaty
Ilranch THOMAS, R D , ZURAHOWSKI. P R Region t,
DPPlce of the Director SO/04/3O 12pp
T lO-Bt?-! NOTffE DAME, UNI V DF
)100fl7 Acl receipt of BOOD2B Itr informlno Nfif of atepa tnkcn to
rect noncDBtpl lance idontifiptl in S00313 Itr Piscusae-j
cens-ae dental oP none ompl unc e Itnm Ifl Bu-month lasd test
req.ulr«d Bupportlng <Tocuinei)tatlan enc I
'PLER.J G Region 3- Chicago, OCFice nf tlio Director BO/OA/09
DOCKET 40-339B ALLIED CHEMICAL CIJHP
B007170&13 Formards IE Circular BO-11, "Radioactive Contamination of
Plant Demlneralliifd Water 8«a t< Resultant Internal
Contamination of PHrsonncl " No urltten response required
KEPPLER.J 0 Reoion 3, Chicago, OfPlce »F thff Director 00/06/24
}70 10(^60 Jlpquvitf. that provision for possession uf Pu-b-eri;! 1 1 urn be
-emovod from Licfffiee SMM-l^a Also renussts designation of TJ
UroriB a* cour*e instructor d only ptrson rotponslhle tar
landling leak teeting
AV,N R Notre Dame. Unlv op 61/12/21 lp
DOCKET 40-34.33 ATLAS M1NEJ1ALB
SOO7130076 Summaru nf B00319 meeting m/Atlo* Minerals In Silver Spring,
MB re final riprap design & installation prior to milt
decommissioning-
GAHCIA.P J Uranium Recovery Lieensinj Dranch 80/04/39 3pp
DOCKETED ITEMS
BOO723Q291 Confirms recent te Icons re van out licensing conditions
required prior to decommissioning facility Licensee
proceeding ui/addl tailing disposal alternative studies
Agreement needed on raising tailings structure
SWANBY.O T Atlas Minerals GO/06/26 Ip
B007Q30099 Foruards 790926 response to IE Bulletin 79-19, "Packaging
Lotu Level Radmante for Transport t. Burial." In response to
ffllC request
DOZICH, T A Case Western BO/06/12 Ip
DOCKET 4Q-4337 MARQUETTE UNIV
B007230O06 Ac* receipt of BQQ6Oi> Ur informing NHC steps taken to
correct violations noted in IE insp of Licenses 48-02931-06.
4B-O2931-10 t> SUD-0231 on 800423 !• 050B
KEPPLEfl.J Q Region 3, Chicago, Office of the Director BO/06/24
DOCKET 40-5O2! STANDARD OIL fO
3007090131 Provides annual rept pn transfer of products containing
eiompt tuncentrdti ona of byproduct matl for License SMD-785
& License I2-13E137-01 No transfers mode Jul 1979-June 1980
BANA5.E M Standard Oil CH OF Indiana (EBB also AMOCO) BO/07/01
IP
— 3007350012 Responds ID NHC 800321 1 br re violations noted in IE Insp of
Licenses 4S-O2931-O6, 48-02931-10 & SUD-0231 on 800423 &
0308 Corrective actions survey meters calibr biannually u/
std providBd Li/Instrument
P1ACSEK.B E . MINER, L E Marquette Univ BO/06/06 E7pp
BOO7340349 Ac* receipt of B007O9 I tr informing NRC of steps taken to
correct violations noted in IE insp af Licenses
4(3-02931-06,45-02931-10 t" EUD-231
KEPPLER.J 0 Region 3, Chicago, Pffice tif the Director BO/07/16
— 0007210398 Ho a pond a to NfiC BQ06H4 1 tr re violations noted in IE insp
of Licenses 48-02931-06 S, 4fl-02?31-10 & SUD-S31 Provides
flddl info re administrative authority licensing-
mcordfcaeplnp ti purchases
PIACSEK. D E , MINEiI,L E Marquctte Untv BO/07/09 3pp
DOCKET 10-6622 PATHFINDER MINEb CORP
B0071BOI3I Amend 1 to License SUA-442. rovi 5 ing Li tense Condition SB to
reduce amount of required cover for Dam 5 chimney drain frpm
S ft to 1 ft tc to appi ovo gradation rango of 1 ft at cover
raatl All other licensi.' conditions null remain same
6CAHANO. H A Uranium Recovery Licensing Branch EJO/06/04 2pp
Q00733O976 Tabulates contract touts incurred ti mantioiire used in
reviewing 7S1297 license application
PERSON. L i LINEHAN. J J Uranium Docavery Liccnsmj Oranch
00/07/03 2pp
S007aao377 Informs of partial refund of fee accompanying 781 120
application for Amend 1 to License 6UA-0'14a
MILLER. W 0 License Fee Management Branch BO/07/lfe Ip
DOCKET 40-4492 FEDERAL AMCIUCAN PARTNEHB (MIN1NQ)
DOCKET 40-6659 PCTROTOM1CS CO - GETTV OIL
B007O20013 Amends 791114 reo.uo»t for porniiB.tian to construct t* oporato
major mod l< eipansian of 750 dry ton per day U ore
processing Facility Reduces request from Si 990 to 9. OQO
short ton* per day at avorags ore nrartn nf Q 1SX U oilde
WRIGHT. K H Federal American Partners BO/04/23 Ip
0007330030 Requests amend to Condition 16 of License EUA-551 to read
"mill tailings sliall not be transferred from site u/c-
specific prior approval from NRC " Amend roq.uired to carry
out research progi am en tailings mgt I, ret lurnati nn
PFAFF,B J PetrotomUs, Inc 80/Ofi/ 1 1 Ip
8007100094 Advi*es NRC thai KH Wrioht has resigned from rederal-
Amurican Partners. Bffoctive (300701 All correspondence
should be add'resseil to CW Pleraon
WfilOHT.K H Federal American Partners, BO/06/11 Ip
H0071000B7 Desponds to NHC request for oddl info re "Suppl to Environ
Rept - Bub surface Tailings Disposal " Dato for submittal of
add! info cannot be mot Qeotechnical uurfc prograniE will
require approi 26-3? mkm until approi Osc I960
URIOIITiK H Pederal American Partners 80/0<b/ll Ip
B007140t93 aubmits contract costs incurred t, manhours used In ravleiuin
7Q11O9 application Project status ropt dtd Q006IO one]
OAFiCIA, P J - LINEMAN, J J Uranium Docnvery Licencing Branch
BO/Oi/13 Hpp
B007020SSO Adviuos that review of manpower uxpendltures required re
rtvieu of 7B1109 application for Amend 9 to License SUA-667
dftorminird actual fee flefund i"l!) be Fnrtli coming Apologlies
for delay
MILLER. H 0 License Fee Managnment Branch 60/06/10 Ip
B007HI01i9 Foruarils "Proposal Evaluation of Ground Water Impacts.
Propo*ed ilubsurface Disposal Projet ti West Oa» HlllHiHV "
PIERBDN, 0 W Federal American Partners BO/07/01 7pp
— 8007B1Q170 "Proposal Evaluation of Ground Water Impacts, Proposed
Subsurface Diipoaal Project, Heat Oas HUH, MY "
HURDDCK.L T Dames h Moore 00/03/03 llpp
0007140593 Requests review of ontl Euppl Info to licen'SfD embantmont
final const rept Foruiarili! 800401 IE insp rept of completed
tailings dam rai so, authori lod by Amends 1-5 to License
BUA-551 W/o ends
LINEHAN. J J Uranium Recovery Licensing Grarch BO/oA/13 ip
B007330193 Discuasoe proposed amend of Licente SUA-531. to upQrade
effluent fc environ monitoring program d to Incorporate two
minor revisions Into radiation safety program Revisions mill
Improve program fie commend a approval af license amend
KOTBCrlixJ L , LINCHAN-J J Uranium Recovery Licensing Branch
00/06/20 6pp
QOD731O543 Amend b to License 5UA-551 modifying effluent t' en
monitoring program & revising radiation safety program
Revised environ monitoring program enc 1
A Uranium Recovery Licensing Branch HO/OA/30
B007330243 Advises that Amend 6 for License SUA-5S1 taa E issued on
800620 b should be oiempt from foes Amend uaa NRC-irii tiatsd
!< requires mod of effluent & environ monitoring program
KOT6CH.J L , LINEHANiJ J Uranium Recovery Licensing Branch
BO/07/10 Ip
B007300269 Amend 7 to License SUA-591 authoriiing transPsr of tailings
samples t< eitonding completiiui dotes fur new tailings
Impoundment monitor Wells RTH 1.3 b 3 from Q00714 to 31
KOTBCH.J U , UINEHAN.J J Uranium Recovery Licencing Branch
BO/07/14 2pp
B00723003O Forward! req.u*at for addl inPo based on revloiu of environ
rapt d suppl ro subsurface tailings diaposal Info form for
radiological assessment & draft rcj guido encl W/o Info form
Ic draft reg guide
BCARAND, R A Uranium RecovEry Licensing Branch (30/07/03 Spp
DOCKET 40-466? CABE WESTERN RL'SGRVE UNIV
79101501D7 Respondn to IE Bulletin 79-19 re paekngino t. disposal of low
level raduJaste Tun »hipm«nt», cuntBinino 4 BS Ci raifuaste.
utra made Prom Jan 1978-Juna 1979
BOZICHiT A Case Western 79/09/26 app
DOCKET 40-67EI9 HOWARD UNIV
B 0070 10! 80 Ach receipt of B004HS 1 tr informing NRC vF steps taten to
correct violations noted in It Insp fiepls 30-11063/HO-01,
30-01321/80-01. 40-67B9/BO-OI !. 7O-0625/80-01
SMITH.O H Region 1. Philadelphia, fuel Facility b Materials Safety
Branch 8Q/Q8/2B Ip
— aoQ70101S5 Responds to NRC 900328 HP rii violations noted in IF Insp
ReptB 30-11063/80-01. 30-01331 /BO-OI, 40-67B9/SO-O1 S<
70-06ES/BO-01 CorrHctive actions effluent concentrations
evaluated fc Cf-292 source tcstad
ALEXIS, C P Houiartf Univ 00/04/ES Spp
DOCKETED STEMS
7010197 Di'jtusios IE. JilLp Ucpts 30-1 IQAJ/HO 01 : :JO-DL321 /HQ-DI ,
0-(.7(lt?/HfJ-(M fc 7ti-(«iI2b/HO~OI on BOO'IBO-PI fc furuarrtu notice
' vitllil tlnm
MirH,« II Ki>i)Lnn 1, Philadelphia. Fu« 1 I". it 1 1 i ty !, Materials
jFetu Dranch 00/03/38 Up p
1701 (WO? Not it e nf violation fniro ins[i 1111 000120-1:1 Nnneompl janco
otr-d failure tii cim<tucV required SUT-VOIJ <» Cf -?DS sourco
toi «tt in unlocfcod roura & food stored in r of T i Qerat ar in/
:ai I also topes
Region 1. Ph i 1 nd D 1 phl^, OffUr of thi> »iroctc.r EiO/m/JLl 2pp
DOCKET 40-BOSS. BRDINSuN METHUD1ET HDEP WrtLAMAZOD, MI
UO070DCJ273 Forwards porsonnal
reijuiromBnts
SIMONS, C B Bronson Methodist H
nitor-ing rapt far 117t per IOCFD20
p KfllamaniB.MI BO/06/37 Ip
- -30070 Hu278 P&rsannol monitoring rept for 1<?79
SIMONSiC B [Ironion Wnthodlst Hnnp Kalamaioo. MI
BO/O6/27 Ip
'T 40-7 HO.3 fULLlJIOJV LUULIIM INlWJliTR 1 EBi fHtMTRUN
4O17H Ilei|ucbto tnnf I rmn 1 1 on of planned .ittinns disc annul in 1)00633
con re radniiic ti v« m.illi rtlsposprt o t Me Old mi Disposal
p in Ncuburnh Heights, fill lenre ui 1 1 be TOpaifiiMP b(j
lAS'it pa trol tstiib 1 1 f.h nrl !^ tourco nf raritl invo B 1 1 g ,ited
PLCRi J 0 Flepion 3, ChUapo. Officif of tlio Director
30100 CdiiCiinii nOt)703 telcnn i-i> Median Lisptitnl Dump in ND
ghts,[]H fioquEBts Ditffnsinn to tnmplrtD jis5D5sment *if
P
EB,H ti Churatrnn furp 00^07/0") Ip
7 4(l-V9Jf3 HONCVHtLt.,
&0700 ruruni-its Waste ['ackanlng Insp Rep I
o t i c D of violatl on
IS. A 13 HoDlon H, •Tliicnrjo, luol racllily !. Matt-rials Eiar*ty
ncti BO/06/37 2p p
71^0710 Hdtiit oT violation fruat inr.p on 4100^1!)
Rifgifiii 3, Gait f-TJirulsto. affico DP the Diroctiir
able I'ackflDiiiH Irvop Ropt 11OOO04A/flO-Od Qn 130O313
oncomp 1 1 pnce notud lirilm tnnLninlnn i nituiat to Faunil to hove
ath i ffipot ing iordboard nv similar sulliJ mall
D(1K,U C Heau.n D. Elan Fi nnc 1 He a, PUD! racllitj t. Materiala
afetij Ernncfi THC1MAU, H D Roglan 1i Ian fr/inc I ana. Office of the
irnrtor [30/0f,/10 Spp
T -10-0027 KtRH-HCtLE CHRP
UDCKET 10-B103' EXXON MINERALS CO USA. EXXON CHRP
f3QO7O3033<2 Foruiarfli Elton c airmerc ia] ocal? in situ amend application
& related matrl in reaponso trj MRC requeit
MATHlfiGN, n L Wyoming. State of BO/O6/04 lOpp
HOO71/oft79 Diecusaes propo»ed monttor aie 1 1 s for Aroa HB re application
for Mining Permit 218C for solution mining at facility
l>rlLli-ng uill bogin m June so that 21 uBllH can be
compluttd (v sampled during sumninr Location mspi enc 1
TflllSSCLL. H H Eoon Minerals Co , USA SO/O6/I3 4pp
a0070TOI()A Foruiorda rBnueats For add 1 hgrfTolOSic inPo iJontifiBd
during re-uieui nf FES re operation op U mill b U solution
mining project
LINEMAN, J J Uranium Flecaverij Licensing Branch BO/06/1B 4pp
Materials
FortuaT-di IE Insp Rcpt 4O-B1 02/flO-Ol an SODAD4-0& (• notice
nf vlolalton
DflOHMjO D Rir-gion 4, Dallas, Fuel Fscil
Branch OO/OhfaO 3pp
0007290237 Notice of violation from Lnsp on B006O4-O6
* UBflinn 1, Dallas, DfFkci? oP the Director 30/06/20 Ip
O007S90Efl4 IE Insp Rept 40-B103/80-OJ on 500604-041 Nnncomp 1 lance not»d
worker mposetf to oiceai airborne U
BRDMN, & O , CA1N.C L Region 4, Dallas. Fuel Facility & Materials
SoPety Drone h BO/06/HO 7pp
UpopDnds to NRG FJ006ia renuBBt for add! info re
hijilraQeol ogle BIJI at site Prel iminai-y analijRis to Questions
7-1 b rnaponoB to Questions 1-6 mill be submitted by 900631
Addl ccmprelicnn VB atudiea. sfiuuld be completed by B 10930
D Etton Minerals Co , USA BOJO7/O3 Ip
rnrmartti romnintlcr of licGncD feu in r cup unit' tu IJRC
Infarrnlng ih.it ruquc&t for omunil tu Llcento liUQ-IOlO to
mlt riiBponal of raffinntu frluilfiD tri b D I DW QfnilQ pit liJ!
ii classlfloil At ma joi amend
LIEV,W .1 Koi-v-McQco Nutloiir Coi p [!0/Oi/IO Ip
7O10&II Application for cimtnd to Licunuu ilJU-lOlO to
isjioia! uf ratfinato nlud^D- Ln bcLnu grndu pit
HEl.LKV,H J Hurr-hcOea Nuclenr foi p BD/03/aiJ Lp
7010-(jl!) Environ ropt For Ce-quoijah Pntllily rarPlnato
iMpaiol Three ovorBlik- draulngb encl
Korr-WcODB Mil clear Corp 80/0^/33 BOp p
DOCKET 40-02OO CLEVELAND-CLIFFB IRON CO
0007100002 Bummarg of QOOSO9 mEBtlns in/Cleveland Cliffa Iron Co in
E3ilvar Spring. M» PH status of Licenses SUA-U99 d SUA-1332 b
BitBl
i 0, 0 Uranium Rocover-y Licertina Branch BO/Oi/11 3pp
GO07B30379 SaPatij evaluation re revieui of 800539 * 1 te Final restoration
plan Kstimatud schodirlv For completing restoration of site
appear* reasonable Pi-opoied thrae-phase program shoud be
InitlBtni) as loan at pois i bl«j ui/020331 comp 1 etion date
ErtDIE.O 0 i flDTHFLEISCHi J . MlLLEfl.H J Uranium flecovery LiceTlBlng
D ranch BQ/O7/02 2pp
O0117 fimenrt 11 to Bourie Mrftl Licansp fiUn-1010 duthorlilng itae nf
lum- troat pd neutralliod colvant e i tr^r t i on raffinat-ir for
til I tor on B iceniBO-Duncd pi-upiirtu per (JOOIHV app I lc«t Ion
DIM 03 Itrisubj to MRC roqir irawen t i
C.n 0 Uranium Fuel l-lcttllslny Drnncti !]f)y-0i,/i/ 2pp
riiruarOii praposul for t onl i nutii! mon( toi-i ng in vicinity of
uoijah effluent outfalliin ai c ordninco ui/Toni! i ti on 13 of
?H5« fjUn-lOlO
LLI-ViH J Kerr-McQeD Hutl^ar Corp BQfQt>/\7 7pp
r 8 Bipn-ridBiJ in
OO/07/J.1 Iji
Listt (.Qdtract tout* incutrod t, njnih
i suing licenau amend Jippl iistl on
uNjW A Uranium Bocovuru 1 Uanslna Crdtvch
ailtSMAH h HLIMEN7WAL. INT
BOQISSQS'W Amend 1 to Licimae HUA-1199 outhoriitng proposed three-phasa
site Pkniil restoraticn program Program mill permit
term! nut ion nf license
A Uranium Recovery Licensing Branch BO/O7/07 Ip
Confirm* plan to conduct Pban* 1 water osmp 1 £ng at In iltu
onlution mining test alto on S00721
LOUDEHBACK, T E Cl*voland-C 1 i ff f Iron Co 80^07/11 Ip
UOCKhT 40-0.104 UYOMINO MINERAL CORP
HOO701O367 rtdviacs that Dept of Environ Quali tyrLand Quality Div hat
not rtfcelvod ahouing oP compliance ui/In Qitu Mining Act fop
ltc«n»(r> Dperations in Dis-brict 4 Bequest* status rept re
mBssuTffs to comply w/mtning act
WjamlTfcO. Sbato of BO/Od»'O& Ip
IOB7S nitquisBO IE In«p R»|it 40~8O«U/EH)-01 ronducted on
compliance noted Majcu' orpas nupoc tad rnilidtion lafutij.
plidncc ui/NltC ruleGrrcgiilationii t< cundi t lunt oF lltsu**
orrective action on prswious item
NEHAM.J D RBQion 1. PI, 11 ado 1 pn la. rue! l-nt i I i ty Ii Hat
ctij Branch HO/07/l-l Ip
OO/ESODOa Application for rBnewnt oF Licansc SUA-1HO4 authnriiino
solution minion R''n activitle* In area Also forwards "Ta*t
Bite 317 TettB JjH !. 3" i "Test Site S17 Teib 4 "
TIEPEL. E M Wgaming Mineral Corp. HO/O7/O7 tp
fl007BffC>aiO "917 Tpst Eitn TBBts 1.3 fe 3 "
t Hgoming Mineral Carp 70/04/14 IP
DOCKETED ITEMS
--B00722Q31S "517 Tost Bite Test 1 "
* Wyoming Mineral Corp 7B/04/16
DOCKET 40-Q329 SALEM HDSF1 BALCM. MA
DOCKET 4Q-B43B EASTMAN KODAK CO
6007010566 Application by Kodak for Amend 3 to T
(formerly ETG-B274)
HrtRTER,E S Eastman Kodak Co BO/06/09 Ip
eiport License
BQ072B0224 Notifies of eipireU License SUC-1213 t, discusses actions to
bo taken by licensee
MCCLINTDCK.lt 0 Region 1, Philadelphia, Office of the Director
BO/01/14 2pp
DOCKET 40-S3BQ ROCKY MDUNTA1N ENERGY CO
8007310243 Summary of B00313 meeting u/util in Silvei
in situ solution mining operations
JtDTHFLEISCH, J E Uranium Rocovoiy Licensing Branch
Spring, HI) I e
BD/04/30 4pp
DOCKET 40-H432 BEAR CREEK URANIUM CQ
B0072400Q7 Forwards nrtdl into for amend to License BUA-1310 "Taili
Mgt Plan." Bear Creek Tailings Disposal into Mined -Out Open
Plti" fc "Leachote Movement from B-3 Pit Tailings Disposal
Area. " enc I
M£DLQCK,H L Bear Creek Uranium Co flQ/07/01 7ipp
-BOQ7240011 "Key Plan J. Bile Plan "
* Davy McKoe Corp 30/06/30 Ip
B007O20702 Corrects OOQ331 application trt amend License SUA-122B
Licensee does nut intend to use nxldant u/cai bonate
livivlant Figure 5 has been revised to ohuui reverse osmosis
brine stream going directly to evaporation reservoir
NEUMANN.M fi Rocky Mountain energy Co BO/05/30 3pp
BOQ7Q30QQH Application for amend to License SUA-lP2Bi containing
statements !< commitmonts which supersede any potentially
conflicting statements in B00331 amend application State of
UY, Drpt of Environ Quality tiuideline Number B end
NeUMANN.M R Rocky Mountain Energy Co BO/06/03 27po
QQ07210166 Outlines Items discussed d commitments made during 000530
meeting re reclamation ti land tt water Duality review
process Requests concurrence on specific agreements
NEUMANN. M R Rocliy Muuntoin Energy Co BO/06/03 3pp
-B007240Q13 "Pipe L ine Haul Road Route - Graded
» Davy McKee Corp 00/06/30 Ip
— B007a-I0019 "Tailing Disposal Plan E< Sections "
« Dava McKee Curp B0/0(./30 Ifi
— -B007SflO02a "Underdrain Sgi Plan !< Details "
K Davy McKeo Corp BO/Oib/30 Ip
— BOQ724O029 "Ooological Cross Section A-A'.B-3 Nine Area "
• Hydrology Associates. Inc BO/07/02 Ip
— B0073400flt "Qeological Cro = 5 Suction D-D',I!-3 Mine Area
* Hydrology Associatos, Inc BO/07/02 Ip
H00707O11D fieaporuSs to 000603 Itr Concurs u/mooting summary w/three
• iceptloni re monitor Noll K-S<l,R<!no Creek addendum t.
Pattern IV startup condi tioncl onnroval WV Dopt of Environ
Quality B00610 Internal memo uncl
MORROW- D Wyoming, State of BO/06/10 2pp
0007220033 Provides UY Dopt of Environ Quality u/ro&ult-s of sample
analyses for lime ovorflow cucuit Reservoir A d D grub
•ampins Request! approval of proposed monitoring program
modi & revised discharge stds
NEUHANN.M fi fiockij Mountain Enorgy Co BO/06/1B Hpp
B007030H19 Responds to B00613 I lr re preliminary water quality data for
Pattern IV Conditional author! ration IE granted to start
Pattern IV pending completion of revioui of BOO330 compliance
nuhmittnl b receipt of acldl data
HDRROMiD Looming, Btntu of BO/Oii/13 Ip
B00717O503 Safstij evaluation supporting Amend S to License SUA-122B
Approval IB recommended sudj to statori license conditions
HDTHFLE18CH, J E. MILLER. 11 J Uranium RucavEry Licensing Drench
BO/06/13 4pp
0007180066 rtmondE License BUA-122B, rnvl sing Condition B authoriiing
us* of carbonatB/liicaruonato liiiviant in Teot Pattern 4
BCABANO.R A Uranium Recovery Licensing Branch BO/06/13 2pp
— 8QQ724004B "Qeological Cross bectionfi "
* Kydrologij ABEOC labes. Ire BO/07/03
0007380073 Submits preliminary questions needing cSarl f ication From
review of supplemental environ rept re proposed tailings mgt
plan Questions may be ansuercd during 790320 site visit More
detailed evaluation uill bt presented
SIIEPHERD.T A Colorado State Univ 79/O3/I4 3pp
B0072101B3 DlEcuBses licensee revised tailingB mot plan presentBd
during site visit Revised plan includes extension cif
existing disposal operation u/o in-pi t disposal Add) points
require clarification
NELSON, J D , SHEPHERD, T A Colorado Stats Univ 79/O3/S9 3pp
B007210177 DiscusfiOB responses to Rocky Mountain Energy Co questions re
project Complete ctnalysis of luny-tetm stability of proposed
plan uiill be provided upon receipt of data noted in
Questions 3 !- S
NELSON, J D Colorado Statu Univ 79/06/01 Bpp
B007330135 Discusses ruvlem of responses to NRC 790927 questions, 790409
Question 2 re dif Ferential Bettlemenk In tailings
impoundment l< Chen t< Associates analysis Estimatril
i)i f fernntla) settlement IB acceptable
NELSON. J D Colorado State Univ 79/1O/OS Ip
B007H40100 Forwards preliminary uatur quality data Upper control limits
for Well H-34 have Uoitn established for pH, bicarbonate, U t.
vanad ium
NEUMANN.H H Hocky Hountain Enorgy Co 00/06/13 3pp
B00?aao022 Forwards application to construct wasteuater facility for
proposed Reservoir C Corrects vanadium level reported in
BOOM 2 Itr. Table 2 Assay results for Resoi-voir H, Monitor
Hill PM-3 oncl
NEUMANN. M R Rocky Mountain Energy Co BO/06/S3 4pp
6007180303 Amend to License 5UA-1310 uuthori i ing roise of tailings tiair.
to elevation 5-140 fl above mean sea level
A Uranium Recovery Liccn&ing Branch BO/07/10 3pp
B007230715 Discusses proposed Amend 7 to License SUA-1310 to aulhoi-ite
raising enlsttng taillnos retention embankment From
elevation 319O 4 to SI 60 Recommends dpproval at amend subj
to listed conditions Drawing end
OARCIA>P J , QILLEK.D M , L I HE) IAN, J J Uranium Recovery Licensing
Branch BO/07/1O Bpp
B0071A0370 Forwards results of B00503 t< 0609 samplings of Pattern 111
monitor wells No significant change in well status t< no
Chang* In pattern operation
NEUMANN.M fl Rncky Mountain Energy Co BO/06/26 3pp
B007210884 Clarifies B00416 i-evieu of operations prepared to accompany
littnue renoual requesli Differences in soils data U values
attributable to different sampling Si analytical techniques
Discussion of Nnv 1779 Pattern 111 eicursion end
N6UMANN.M R Rocky Mountain tnergy Cn BO/06/30 31pp
B00730OD4Z Outlines contrnet costs incurred h personnel hours expended
in rcvieuiing 600303 license application
ROTHFLEIBCH, J , BCARrtNOi R A Uranium Recovery Licensing Branch
BO/07/14 Ip
— 8007230721 Forwards hydroloi|lc engineering summary for U mill Proposed
design for operational period meets hijdrnliigic design
criteria suggested In Reg Ouide 3 11 Several issues should
be addressed before long-term stability can be assured
BIVINB, U B Hyrtrologlc ic Oeotechni cal Engineering Branch
— 8007330735 Discusses questions TO proposed tailings reclamation plan
Expresses daunt that eitensive tracking would extond through
depth of- cover If min thidmeis of 3m is adhered to All
outstanding issues have been adequately addressed
NELBQNiJ D Colorado State Univ 80/06/23 Ip
DOCKETED ITEMS
DDCKtT 4O-8*B1 BQElrJ'! CO
aaQ72BQ2JB Application by Doeing Cn tur A-nenri t> to eip:
adding rtngala, Carrcronn !, Libijati Ar-sb Airlines ai ultJ
consignee
MORGAN, H E Boeing Ca BO/Oi/ 1 1 Ip
DOCKET 40-B5O2 IRIGrtRftV M1NF. UYQMINU MINIMS
80071 406Q& EiprossEs concern re immediate oLdnnrnic coTiBequenreE
Buffalo, M* mill E.perieticE if uorl jt u mine is Halted
NYaRClN.J Affiliation Unknown BO/04/Z5 Ip
8DQ-7O10591 Foruards liceneee BCO-129 1 LP to State of W re mine site.
Including meekly uater quality OIM 1 y.i-5 results pie i ometri c
contour napt J. map of HBUJ sftallou research uell locations
Drawing available in Central File-i onlij
HICHEBSiDL Wyoming Mineral Corp 90/05/02 I5pp
— B00714'0(ill7 DiscUEsct hac It ground for- modifying licenso Si terminating
QQ0421 ahou cause order to licensee fJRC has concluded that
luivlant !< pollutants ore being confined laterally to uell
field vicinity in designated hi] dros tr<iti grap hi c honiiine
M, R S Uranium Recovery Licensing Branch SO/06'/ 13 2pp
BOQ71 50644 Forwards latest communications between Bito t< State of UYi
dated DDOS13
U1CHERS.D L Wyoming Mineral Corp BO/O6/16 Ip
— BQ071E0651 Biit-mlts biueckly itntui ropt for Hlne 478 Forwards
piem-metrlc contour maps of shallou tone based on static
mater level mBflturemontB from 00053/ t. 0602 samplings
Tiao overall? drawings enc 1
UICHERB, BL Wgoming Minuriil Corp BO/06/13 lOpji
~-B0071!)Oi(,57 "Research Uell Locations Plemmetric Contours " Sheet 1 of
1
* Hyomino Mineral Corp 00/04/09 Ip
SOD702QQ7V Submits i eyt re DOD41S result; aF uee k 1 y sample anaHj5li
From Shalloui Monitor Hell srl-12 ticesding upper control
limit values for cMorida ti total alkalinity Diagnostic
wells drilled- to doFine eitent af chlorido raigiation
HICHERS.DL Uyoming Mineral Corp BO/09/20 Ip
6007310283 Summary nf 8C0430 mcetin*) w/State of UV officials !. VIV
Minerals Corp in LNeyennei H> re NRC nrdor to sh.au cause
FDNN£!f,R L Office of the Liecgtlvc Legal Director SCrtflftNQ.n A
Uramu-m Fletovery Licensing Drancfi (30/O&/21 Spp
8007030352 Forujarda S00530 bitoeeklhj statua rept IB rcc&nt rngnitorinj
offorta of Ehallouj monitor lane Tiira ovcrine -drawings, enc 1
W1CHERS. 1) L Wyorning Miner ill Corp Qfl/Ofa/05 lOpp
HOO7O30363 "Pieiometr i C Contnurs iie&s
Units 1.0,3,4.5 I, t, " Sheet I of 1
• Wyoming Min&ral Carp acwcn/13
Well Locat 1 Otis. Pi- oduction
— 60071H06(>7 "Resoarch Well Locations. PI piametri c Contours " Bheet 1 of
1
* Wyoming Mineral Corp SO/04 /O9 Ip
BQQJSlOQ&t, RoijuestE that all available uatot* quality data frum neuily
itrilleil stiallou monitor walls be faruardod t< that future
data bo encl iv/bluae k lij statua vvpts At BO ret|uostB info re
split eamplt^i taken 800912-15
MOniiON.D NuDming< State or CO/06/ 1 9 Ip
D0073I05-12 Foru-ards c ori-ocpondonc o ui/Qtatc of UY re IrigarariJ site
Stiflllaiii 53nil monitor iiicll data DverBilO dr-ouinB encl
WKHERS. [>L Wyoming Mineral Corp QO/Cb/SO 4pp
— 8007210849 Provides WV D-Hfit of Environ flualitij u/uatdr [jualitij data t,
nap identifying locfitions of eipluratmn hale in area of
Production Unit i Oversii-u map em 1
WICHEItS.D L IJyomihg Mtncral Corp nO/Oi/16 7pp
— S007O303ft4 "PieininelrlL Contaui s tteiearcfi Well Locati one. fMidutti un
Units 1,3,3,4,5 t- t> " Sh*et 1 oF 1
* Wyoming Min&ral Corp BO/05/19 Ip
9007310DS3 "Location of Ei plnrntioTi Hole In Production Unit t>
Sheet 1 of 1
H Huomlnff Ml rural Corp BO/06/O5 Ip
a007100145 Foruardt B00521 sulTmd^y of- 3004:30 meeting w/llccnsea I.
State of MY re S0042 1 slioiu caiide ordei
BCARftND.B A Uraniuni Recovery LuEiising Dranth fiO/Oft/03 Ip
— B0ft710044i, Huramaiij of 8(10420 meeting u/Ucentee ft State of WV re MBC
600121 oilier tti show (.au^p is-s-ucd tn licensee Conditions For
lifting oF Immediate f*f f er tt venisss of oruep one 1
SCARANn.fi A Uranium FlflCnvei'y Licensing Branch FGNNEfliR L
Regulatluns Division BO/U3JS) 3pp
B007OHOi94 Ajiprove-B expansion into Production Unit d of U ramo u/s odium
bicarboiiflto 1 i i i Viatit, contl ngoint upon NfIC apprnwnl
CroundwatPr rcstnrntlan after lomptetlon o* nintng shall be-
to average ua-seltne vdlues using best posEltlo tochnQlofly
ACKERMAN, W C Hyoraing, Btato of BO/Od/04 3pp
B007010567 Advises that Dopt of Environ Quality, Land Quality Div has
not received shoiuina nf compli«nci! ui/In aitu Htnin-g ftct for-
\itensee opera tion-6 in District 4 Requests status rapt re
measures to comply iv/inllilng dct
tfijotningj State of BO/06/O5 Ip
B007070120 Submits data of 800603 «, 05 samples taken From latest
Bitui"sian into Q field of Unit 3 RS-47 pumping auMinrlied'
HORROHi D Muikinfrig, State of [10/06/06 Ip
H00707OU7 Poruards Iriaaray site OOOftOa I tr to Stflte of WY i-u nsaai
data frnm BH-11
WICHERSiD I, Wyoming Mineral Cprp i)0/0fi/0ft 4pp
8007100493 Summary of Q004?8 merlins m/]iceni«E ti State of VIY In
Silver Spring, MD re licenB-ea Tesuonse to B00121 Ehou cau*s
order suspenilinB -solution mining operation* fc asUng uiJiy
suspentton should not be permanent
HflUFMANN, R S Uranium Re-covery Llcuiis-ing Drsncli 80/06/13 3pp
B007140600 Respond* to BOOi.09 mumo by .idvisjnj that Nf!C corr»ctivfr
action to date r* pvojeft has bcpn iBauanc* of H004LM fr 05S3
ordETfr First orri«r dad effect of- tllriut-inB inimBdiatf
iusponsioii of normal activities at *ite w/fl end orifera
BWRftND^fi A Uranium Recovery Licensing Prancli DO/06/13 Jp
00072)0006 DiBcussps tohtorn rst eco-nomic tonsBqunncDs that could be
Impoaod on Buffalo !( Jahnson Cuunty, UV w/c urtal Iment of
U solution mining project Modifying lice-nap order issued
2a> ncr-int tt ing limited operation for '/O doys
i U A Uranium HDCOVBTIJ Lieonstng Urnnch BO/06/23 Ip
0007 3 3 007 1 ftildr Bases concornn re ecoriomic consuiiuencoo Df project
turtailnient MRC 000533 madlHud 1 Ic-ense order permits
reaunptlun of limitod oparatians Licensee must demonstrate
anvironmonta lly <uct-n table oporablosi
A Uranium Rocover-u 1.1 cojiamo Branch BO/06/H3 Ip
0007H3007/ (VdJr-obsm cone urn* re economic coniHquBncDs of project
turtailfnent NHC 000-&33 madifiotl litonie order permit*
MjfluitiptJon o-f limited nparatlonl LScenuce must demanitrate
environmental ly ace on table opera ttor.
A Uranium Rdcoverij Llcer-tino Branch 00/Oo/B3 2pp
Q0072300H3 ftddr*»»B» concerns re cconnmtc consequences of project
curtailment WHC fJOOSSU nodlfLad licence order permits
resumption of limited nperatlone Llcuneee must demonstrate
•nvlronmentol ly nccirptable operation
i ti A Uranium RB-COVBIMJ Licennlfig Branch BO/06/23, Ip
0007 S3 0271 AJ vi SUB that MKC is eensitivo to economic consequences of
(iroject curtailment to Tnun of Duffala d Johnson CountijiVJY
NRC isDuoil modifying licensfr nrdor on 000523, allowing
lieerisD* to rBBume llmitod operation.! for 90-day period
EjCA!iftNO>R A UrnnlDm ftncove-rij Licensing Dranch E3D/0&/33 Ip
B00723031B AdvlloB that NHC tt senBltlvn ta economlt coniequencBs of
project curtailment to Taun or Duffulo fa Johrmon County, WY
HBC Isagod raodiFylng license oriBcr nn BOOSBTi al lowing
llce-nse* tt) resume limited upBratiuns For 90-day period
SCARANO.H A Uranium Recovery Licensingi Drancli GO/06/33 Ip
fl0073SOt1B Roaponili to concern ft bout ecunomic coitBequencos of project
CurtnUment NflC B00323 orilor will (iwrmlt re<umptinn of
limited D|>erationt Public htnlth t< nafoty will nol be
•ndangBrud
SCARAWQ, n A, Uranium Recovery Licensing Drancli 80/06/23 Ip
800721 01 IB nuquFstn info rn cnnt-ominantt in aquiHers near Buffalo, MY
DRfiV, K Affiliation Unknown BO/O6/B6 Ip
DOCKETED ITEMS
8007210101 Notifies that on 000523 samples From shallow monitor well
SM-14 indicated chloride !< total alkalinity exceeded upper
control limits Caused by producing recovery me 1 1 Addl
monitoring underway
HICHEJ1B, D L Wyoming Mineral Corp BQ/06/37 3pp
8007210191 Outlines status of action Items agreed on at 8006)6 meeting
ra authori lation of Production Unit 6 ti 1.600 gpra flow
e»pansion request Technical support info has Seen submitted
Lists addl environ studies
TJEPEL, EW Wyoming Mineral Corp DO/06/30 3pp
3007250094 Notifies that BOOil? restoration plan t. license request
are acceptable ui/Pol lowing condition Surface reclamation
is not complete until good vegetative cover is present
MORROW. D Wyoming, State of BO/07/03 lp
000 72100"? 5 Forwards requested tabulated data on monitor well upper
control limits & initial t current assays for research
uiella
TIEPEL, E W looming Mineral Corp BO/07/07 3pp
BQ07210093 Forwards requested tabulated data on monitor well upper
control limits & initial fc current assays For research
wells
TIEPEL. E H obsolete code BO/O7/07 Spp
B0072B02QO Notifies that JH Corcoran has been appointed mine manager of
Irlgarary in situ mine aitei Johnson County,WV
HDHNE, F C Udoming Mineral Cnrp QO/07/09 lp
B007280303 Submit H analysis of ammonia In shallow sand monitor wells,
Unit h
MORRDU, D Wyomino, State of 80/07/15 lp
0007230063 Addresses concerns re economic consequences of project
curtailment NFIC 800323 modified license order permits
resumption of limited operations Licenser must demonstrate
environmentally acceptable operation
BCARANQ.R A Uranium Recovery Licensing Branch BO/O7/1B lp
DOCKET 40-8384 UNION 76 MINERALS EXPLORATION CO
S00725O1D7 Advises licensee that na add] fee is re^un od in connection
in/Amend G to LiLenae SUA-I350, i 5 sued on BOOS03 Licensee
paid mji fee for minor safety (• environ amend
MILLEH.W 0 License Fee Management Branth DO/07/13 lp
8007290-61^ liefer-, to BQObl4 Itr re SOOS14 mill start-up notification
Mill start-up eipected B0091O instead of BQOai&.due to
const delays
AI1COBTA, rt P Union Minerals 130/07/31 Ip
DOCKET 40-B5B3 WYOMING MINERAL CORP
0007010314 Application for amend to License SUA-1313 revising Figure
3 2-1 estimates for flouts through reoin ion eichange
columns Roquet tt issuance of amend by SOO903 Fee cnc 1
SCHENDEL.K R Hyominfl Mineral Corp 80X05/27 Spf
SOO723Q084 Discusses BQ0327 application to amend Condition II of
License SUA-1313, al tering flow rates from a, bbb to IO, OOO
gpm ion oichangc feed t< 6.710 to 10i07O gpra ion eichange
tails HecnmmendB approval of application
HEVEH.R S , LINEMAN. J J Uranium Recovery Licensing Branch
BO/07/ 10 Spp
8007240300 Amend I to License SUA-1315. revisinm Condition 11 ro release
of process waste
BCARflND. H A Uranium Recovenj Licensing Branch SO/-07/10 lp
DUCKET flO-OfiOB UNITED NUCLEAH CQFJP
QOD7iao2BB Summarizes 800432 visit to main embankment foundation &
impound merit area preparation Recommends continued const Prof
engineer should supervl SB. muni tor. document t< LOrtify al!
phas-es of const process
ABT. S Ft United Nuclear Corp BO/04/27 3pp
H0072QOOii6 Advises of recommendatinn-s made re increased documentdt i on
b certification of embankment const from 0004 SS Insf
Foruards rcpt of initial uork follniulng NRC insp Entire
documontabion uill be examined during 10X- inBp ph^sc
ABT, S R Colorado State Umv BO/Og/!E 4pp
60070 S003Q Advises of intention to occupy existing In situ camp
facilities in Section Bl , Tnunsh ip 24 north, Range 93 uest,
Bueottuater County. WV for approi S yrt besmning in Moy or
June 1980 to conduct U exploration activities
AC08TA.A P Union Minerals BO/03/21 Spp
60070 103 OB Notifies that fill placement hns resumed on Cell C of
subsurface tailings impoundment at Sueetualer U project
Submits tentative schedule for completing eel] const Revined
date for tailings cell liner installation is 3 006 1 6
ACDBTAiA P Union 76 Minerals Exploration Co BO/05/08 lp
8007170391 Forwards IE Insp fiept 40-H602/BO-01 on 800433 Ho
noncomp 1 i anco noted
BHOHN, 0 D Region 4, Dallus, Fuel Facility & Materials Safety
Branch QO/06/10 2pp
— 3007 17021?? IK Insp Fiupt 40-atOJ/BO-Ot on BOQ122 No nancDmpllan.cc noted
Majnr areas Inspected NP.C regulations !< npjiltcatjlD civil
engineering sail stils
HARRISON, H C Ragion 4. Dalian, OPfic* nf tJie Director ADT,S H
Colorado State Univ DROWN, G I) Region 4, Dallas. Fuel Facility fe
Hat crisis Safety Dranch BO/Oh/Qb 2pp
B007180t01 Discusses proposed Amend 3 to License SUA-13SOi Involving
modi to tailings pond liner sys Recommends approval Const
mods. Include removal of soil cover except in traffic areas,
at dike top, at diVe bench b at PVC/Hijpalon seam
OILLENrD M Uranium Recovery Licensing Branch BO/06/03 Ipp
-O00717O302 Provides trip rept re B00422 site visit tn main embanl'meiifc
foundation t< impoundment area preparation Recommends United
Nuclear Carp proceed u/maln emlmnfcment const i< prof engineer
supervise all phases of const
ABT, S F? Colorado State Umv 80/04/27 3pp
B007R40103 Amends Source Matl License BUA-1330 to add Paragraphs j. k
1 to Condition 39 h modifies Condition 4I-4H tt Paragraph d
of Condition 40,
8CARANO.R A Uranium Recovery Licensina "ranch BO/06/03 3pp
— B00717O308 Forwards consulting ennineer rcpt of tuittal uork, r
increased documentation t< certification of cm band me nt const,
following NRC Q001S3 insp
ABT, a R Colorado State Unlv BO/03/JE flpp
B007210B60 Submits addl monitoring Ii/or clarifyini) data per RA Bc
790316 request r» "PreapBrational Monitoring Re-ot "
Qversiie map end
ACPBTA.A P Union 76 Minerals Exploration Co BO/06/04 20pp
— B007210S66 "Preoperational Environ Monitoring Locations "
# Union 7i Minerals Exploration Co 60/05/31 tp
DOCKET 40-8A17 KERH-MCGCE CORP
RQ0703CQ3I Forwards environ repl.Buppl 1 i< Addt-nduni 1^ rpsponding to
NRC 771B19 questions re prnpoted new U mill In<li!dei tliree
design drawings of proposed retention paid
SHELLEY. W J Kerr-McOeo Nuc-lear Corp BO/05/09 lp
B0071004SO Requests that two const inspa be conducted of tailings
impoundment, Insp of results of excavation by blasting should
be performed during last uih in June 19BO Insp of synthetic
liner installation should be performed in mid-Jul 1980
BCARANO.R A Uranium Recovery Licensing Branch 80/O6/19 Spp
B0072306BO Submits contract couls incurred !< manhours used iti revi
790713 llcenia application
GILLEN, », , LINEMAN, J J Uranium Recovery Licensing Branch
80/07/OE) 3pp
— B00703003S Environ rppt.Bupjil 1 !. Addendum 1, respondi ng to MRC 791219
questions
* Kftrr- McOee fluclear Corp BO/Ob/09 Bpp
— 8007030039 "Tailings Disposal Sturfij - Hillsidt- DEpotittor H/DrainHHB to
Excavator Ponil 'P ' "
* Etearns-RoBer. Inc BO/OJ/05 lp
— S007030-OU7 "TatUnoi Disposal Study - Hillside 4, Pond 'P ' Sections "
* Steams-floger, Inc BO/OU/05 Ip
DOCKETED ITEMS
SOQ7030.055 "Tailings Disposal Study - Hillside !. Pond P" Reclamation
P 1 iTn "
• Sleiirns-Hnn&i-, Inc BO/OEVO4 Ip
007OU19TO Foruariia addendum to 'Environ Rept, South Powder River Dasin
Mill," in rinmtJTisp In NRC 000201 requeat Dcse calculations
used in initial rspt more modified to include milk pathway
evaluation
SHCLLEY.W J KL'rr-MtQee Nuclear Copp 80/Qi/Q£ Lp
fl00723O731 Furua-rds copy of NRC SOOfiOi Fee- request far 800523 amend to
License SUA-I39B for Tnlief from License Condi tl ons 41 & 47
Requests payment within 13 days
UEISS.D Licence FOB Management Branch BO/O7/16 Ip
BuO728056'1 Informs uF forthcoming refund re review of B00414
application for Amend 3 to License SUA-133B
MILLED. H 0 License FSB Management Dranch SO/O7/I6 Ip
H0070I03V2 Addendum S to "Environ Rupt,3outJi Pouder- River Daaln hill
" Kerr-McQee Nuclear Corp aO/Oft/Oi E^pp
OCKET lO-SfcHl ENERGY FUELS NUCLEAR, INC
0071HD4VI Summarises SOO4I3 sefetij insp of DUe 3 !. placeroant of PVC
liner in Cell a fiocoiniiiPTids continued const Consulting
englnoor should remain onslte to ob nerve-, choc k f. document
all activities re preparation, pier emetit t, inap of PvC liner
AtlT.B R Nuclear Fuel Sorviceg, Inc (subs of Qottu Oil Co )
00/0-1/10 13pp
0072B0070 Forward* anotau of IOX irtsp of Embatitment 3 !. lining of Cell
2 Hei)UHstH that typographical error on Page 3, Paragraph h,
Line 4 in liOOfllB rept b-e corrected ta rsad "IB inches along
Birinankmont " Change critical for compliance H/o ontl
flDIi 8 R Colorado State Univ HO/O4/30. !p
0071,00277 9i™marijBd BOO-121 70V, Insp of Dike 3 Recommends contlnueri
canst DenBilij recurde re sand drain on Embankment S should
be checked for licensee compliance prior to final approval
oP Dp-BTaLion
AuT.a R Urits-d NuclD.ir Corp BO/03/19 3pp
007280175 BflFeLy nv.il Ufltlon Ttcommend ing approval at Amend 3 ta
Licente 6UA-135J3 ui /noted conditions Amend would involve
«ifi!ltlan of »emnd cruBher unit to ore buying station
c ircul t at mill
01LLCN.D M , LINfeWAM. J J Uranium ftecoverij Licensing Branch
Hjip
)Q7170327 FnriuaiT'de IE Inap Rept lO-BiBl/BO-Ol on BOO-11S !. 34 No
noncompl tnjii c noted
BRDWN.O D titginn <t. Dallas> Fuel Facility E< Matorl^la Bafetij
nranch 00/Ob/ll Spp
000717033') IE lns|i Kept 10-H6BI /ao-tti on 800015 (. 21 No noncomp 1 iance
noted Major ureas inspected NRC regulations Ii applicable
cWI) oiiQiniiorlnfl soi 1 s-tds
ttARRISONrH C n«glon 4. Dallas. Office oF thn Director AUT,8 R
Colorsifo State Unlv BltDWN.C D Region 4, Dallas, Fuel Facility t<
MateriaU BflPDtij Hrancli BO/04./OA Spy
DOCKET 40-O673 O(!LE PETROLEUM, INC
9007020293 Submits quarterly rept for B002O1-O'130 re pilot in Bltu U
solution mining operation Ne-ltbor U recuverij plant nor
restoration plant mas in operation Thus.no info ro
in joe t ion/recovery ratea I< vols to reverts Dimoais available
3AUNDERS.O A Dg 1 e Petroleum, Inc BOVQ3/O9 Bpp
DOCKET 40-B697 RDCHV MOUNTAIN ENEROY CO
0007020083 Responds to H00506 request for written confirmation of
.agreements reached at 000502 meeting Land & Mater duality
Divs are currently rovleuing BOO 530 tutmittal re compliance
u/In Situ Act
HDRROM, D Wyoming. State of QO/06/13 Ip
SQ0702GOi4 Notifies that G0053O cubmlttal does not demonstrate
compHancB ui/In Situ Mining Act RtcD nctivit« at site will be
permitted until grounduiater roBtoratlon It othar data are
sufficient to support application
MDItFlaH.D Uijomlng. State of BO/06/13 Ip
Q0071B0057 Buminar I i ec (irupoEed changHH or additions tu 000423 license
emend request Modi correct omissions In original document or
revise procedures based on recent Field «>perionce
IUANICKI.R Rocku Mountain Eiiorgi) CD 00/O6/W Spp
[! 007 21 00 63 Suggests that state o-uopund Rene Creek license to minu after
30-day notice fur failure tu mate application far commercial
Facility Grace period uill provide facility ui/iiddl time to
complete Forms for in ttitu ItfcD llcanno
MOflROW.D Hijomijig! StBto of BO/Ot/2O 2pp
0007270H70 Foruarils Form 5. "Application for In Situ HeaBarch Testino
Ll««nsci" in reapunse to State of HViDept of Environ Quality
000613 request U/o- enc 1
IWANICKI.R C Rocky Mountain Ennrgg Cu BO/O7/10 Ip
DOCKET 40-B69U PLrtTETAU REBOURCE3, I TD
-B007170ail Submit; trip rept rn Insp af Dike 3 I. placement of PVC llnor
in Cell E f(*t onidend B that uiork conducted jp to tnsp time lie
approved for continuation ?i thnt consulting engineer remain
oniite to obburvB. tltoci !. dotumotit all activities
AHT.S It Colomilo StotD- Unlv SO/04/1B IPpp
-0007170332 Bubmlt* typ DQl-flphlcal correction for fl004]B trip rept re
ptaeemirnt of PVC linor in Cell Z, indi bating that Energy
FueJ-s Nuclear ha* complied u/1 icenj.fr condl (.tons
ABT.fl R Colomito State Univ HO/09/OS Ip
B0071B0074 rtmanil 14 to LiCBmo BUA-1371. revising Condition 41 to chango
advance notification required prior to certain const
mileitoned from 3 to it inks
BCARAND.R A Uranium Rscuvery Litonslng Drantli 00/03/09 Spp
D0071fJ04ao Bumrnai-ijoa B00429 aito visit t inap of embankment foundation
(v Impountfment arm RBCommenils continued con at Vendor should
Formulate & implement design for insuring tight noal is
formed bttwBon Zono 1 matl t< groovas & nverNang joint
ABT, B R Unitod Nuclear Corp QO/05/2D 7pp
-B007I7033S Trip rest ro 800424 70X iji»p at Dike 3 Recommends that work
up to Insp time tie approved & tliat Energy Fuels Wtjclesr be
allowed to continue contt of srnbantjn&nt Also recommends that
final approval bv rendered for mill operation
ABT.B R Colorado Btfltd Univ 90/05/09 3pp
1071 000 17 IJiscusHOi actions tAfcen liij NUT In response to Btatc of UT
flOOfilE Itf re archaeological activities bvlog performed at
factlittj Intcrayancii ArchaDaloglcnl Bvca will check uiork For
eanPoimanco w/memorandum of sgresment
BtAR.ANO.il A Uranium flpeoverg Llconslna Branch 80/06/17 Ip
Q07210090 Distuftsoa rtoms 1-3 agdresBBd in first Itr to NftC t,
dlscugs«d at BOQ6IH meetiiiD ro tlbe PiecemeaJ approach to
nemo (if ajruemnnt uitll have detriment^] effect an
*rcham)) o-jical anolijili
BMITH.M T Utnn- StatB of HO/On/30 Epp
007230A7H 3uhmH.fi contract co-afcc mcurrcii (< manliours used In reviewing
B00414 license apul itatlon
OILLEN. C . LIM£HAN.J J Uranium Reiovery Licencing Branch
BO/07/DB Hpp
DOCKET 40-B70H AHMY, DGPT OF, AHMAMtNT MAT READINESS COMMAND
0007110627 roruardB IE Inap Rept -10-Q/OJ/BO-01 on BO0422 No
noncomp U Jincc itotptf
CltDCKEli.H M Rofllon I, PMladelpMa, Fuel Fscilitg & Materials
SofBtij Drnnch QO/OH/21 2pp
— 0:0071-10631 IU Insp Rept 40-B7O3/tJO~01 on BQQ433 Ho nancompl lane B noted
Major areaa inspected rcviou of decontamination plans ti
fan i 1 1 1^ tour
CDQCHCn. HW Rojipn 1, Phi ladelnhia, Fuel Facility Si MatBrtala
Safety Branch COSTELLD, F Region 1. Philadelphia, Office of the
Director 80/05/30 2pp
DOCKET -10-Q714 CLEVELAND CUFFS IRON CO
0007IOOOD2 Bummarij of 1300309 meeting u/Cleverl and Cliffs Iron Co in
Silver Bprinij. M» ro status oF Licenses 8UA-1I99 fc SOA-135a b
1 1 ten
EAD1E.O 0 Uranium Racovery Licensing Branch, 80/Oi/ll 3pp
B007S301il Safety ^valuation re minor changes in supporting info
•ubmitted w/appl icnti on for Licensn 8UA-I33S Increasing
project sito to 12 5 acre* should be authoriied ElS.negntive
declaration of EIA need not be prepared
EADIE.G G > FldTHFLEIGCH. J . I1ILLER, H ,J Uranium Flecuvery Licensing
Branch GO/OA/3O 2pp
EJOO7310946 Amend 1 to Licerne BIM-13S2 increasing total permit area to
42 1/2 acres while actual luull field i-s unchanged
SCAHANO. fl A Uranium Recovery Licensing Branch BO/OAY20 Ip
B0073104B7 Application to amend LICBIIBP SUA-1353. changing Condition 1G
to authoriie testing of oiynen &/or hydrogen peroiidc u/
ammonium carbonate lijiviant to Diidiio b liberate U from
miniraliied sand Fee nncl
LDUDERBACK.T E Cleveland-Cliffs Iron CD BQ/O7/14 3pp
— B007i3ri)l>?O Reque&bs u^e of f r i>ub(iiir<J atliily BIS for sv&pnra 1 1 nn fit
prpsu-ntod in HO0201 repl, "Ernhan Idiont Info For North ti fjiiulli
Lpvpniet gcT flosri-voirs "• Timely n'vieui mould lie Bpf roc 1.1 tin)
in urdur tu denvunstrrite grouiidua lei r L-storat mil
HEULIHV. D United NIK 1 tar Crirp EIO/OW0.6 -1p|>
OO(mUO4J2 Submits ivaluotinu for Liti'nse iiUrt- 1 173 TU direct irnlifli
above pruce^s equipment 6 fcni.kt Above tank yintilation aye
rt'ducod concuntr.i tioriE of i csdon r. rjclon dniighteis tu which
plant persfiinnol uwre pntontially ui[insud
(11EGCR.S N Tt'ton Ciploi a tion Drilling Co , 1 nt BO/OiW2O i'P
B0072BO7OE! HubmiLa [..valuation of ruit-d filF direct a i h.ius 1 1 nij abnvu
procoss eq.inpmi?nt l< tankf, to rcducu imlcn t la 1 1 ij tiiijli
contenti-rtt Ions of rndon d radon ilflugliters
RlEOEft.S N Toton Ciplnra t ion Drilling <'o , Inc (30/06/20 tip
DOCKET 40-8731 RDCKY MOUNTAIN ENEROV CO
8007210243 Summary of 800313 meeting w/gtil in Silver Spring, HD re
In situ solution mining operations
ROTHFLE1BCH, J E Uranium Jlocoverg Licensing Branch BO/04/3Q 4pp
B007020"l3a FleuponriE to BOOSOi request Fur written coneUrrenco re
apruoments reached .at 800303 meBting Mining permit must bo
converted to in situ RW) license in ordiiT to conform lu/code
requiramnntB
MORROW, D Uyoningi State of BO/06/13 Ip
f!00723Oi67 IHacu&neB B00617 app 1 1 cation tti .iniDiHl HCDDHB SLIA-1'171.
fluthopno effluent uaBto level*, In evaporation pond'i tn rise
to 5.311 b ft REtonmondE iippruv-fll of a-meni) nrovidod Literiso
Condition 32 it, ruvisorl to permit 2 1 Ft n P froc-hojird
HAUFMANN, F* S , QlLI-feN, D M . L1NEI!AN,J J Ur.innim Hocovet'V t Iron
Branch HO/07/O7 3pp
0007330711 flmond 1 lit License SUiV-l 37:i aifthorldnn increase in uPf
levol in ovapora Lion pondt
SCfiR/lND.R A Uranium Rccovury Lici-nsins Drftnch 00/07/07 Ip
DOCKET 10-0745 OSJ^E F'GTROLEUM
DOCKET flO-07B7 HEHR-MCQEE NUCLEAR CORP
BO0730O33I ProvidnB Subcommi ttse on Energy & power ui/nottcu of issuance
of License SUA-137B W/o end
* Office of Nuclear Material Safety & Safeguards BD/Q4/1& Ip
B0O730053S Provides Subcommittee on Nuclear Regulation u/nntice of
issuance of License 9UA-13/B H/o em 1
» Officn of Nuclear Material Bofety fc BafDouard* 0Q/O4/16 Ip
SO073003S7 Provides Subcommlttoe on Env 1 run, Energy b Natural Retoiircna
in/notice of Issuance t- negative declaration For Lie ens f
BUA-1370
* Office of Nuclear flaturial Bafetu & Ba f eguartU 80/O4/16 Ip
— H 007300560 Notice of Issuance of Licunse BUA-137H tr negative
declaration,
fiCARANO.R A Uranium Recovifi y LlUenilnfl Branch 80/O4/Q9 Ip
8007300Q&3 Provides fiubcomnu ttBD on Enoi-jij {. Environ u/notice of
issuance of License SUA-1378 W/n anel
« Office of Nuclear Material Safety & aafoooarrfs BO/04/16 Ip
8O07230A20 Tabulates contract coats incurred t manliours usod in
revieuiing 790611 licenms application
WU.O , MILLER, hi J Uranium Recovery LiCDnnlnD Branch 80/O7/03
Hpp
BO 0703 O3 3 6 ddvUt'o tMat «pp I 1 1 Ji tipn far (itrmiaaion tn -drill uitlli
cnmptotH For publication t( notification Wolls IndlLiiteu1 Jn
H0052/ Itr should be drilled Hi tnon ii 5 pncnliile to flL't
basoliniug Fur til or nlgng
FRANCIS. C Wyoming. Btate Df EJO/03/«''9 app
8007170133 f-'nruinrdB NUFIEO-OA07. HCG on enviran i onu oq.usnc t-B r-u Iliflur
Basin Project fc TR notice
bCARANU.Jl A Uranium Rotovcrij Llcnnnlng Branch £30/O(./13 Ip
— OOD717O-13A Nutico of nvai 1 ati 1 1 1 tg of Dili Por Blsnn lln*in Pro/eel
BCAHrtNO, R A Uram um flee nverj Lit unfit no. Branch OO/Ofi/flV ,lp
— B00717O-14O DL!J for Olson lUison ProjBtt
« UFflca of Hutloflr Matcriul 9af-otij (<
17»pp
OO07300O1;, provides Subcommittee on Energy f< Puuei io/,Juiio 19E1C [)t Ii
encl
* Office of Nuclear Material BuPotij (• Em f-tiauarili, QO/06/K1 Ip
— f)0073I>OO^H ProvtuEfi aulicutnmi Ltcw on Nuilcflr regulation u/June llll
H/o one I
* (tfflte of Nuclear Material BaPciij (< GafeBuordo DO/OA/ 1 '1
— P00730OOS1 Ppovidun Subcnitinii Lie* on Enoroy fc Cnvlron iii/Oune IVflO
W/o one!
» Office iif Nuclear Hater I »1 Safety R fcaPaiounrds nO/0£i/i:i
DOCKET 40-B73B TETON EXPLORATION DPILLINO CO .INC
BO07010129 Foruavde "Embankment Info for North & South Leuonberger
Raaervoir>i " roqulred by Stipulation 32 aP Source Matl
License BUA-1373 Fee oncl
HERLIHV.D Totan Exploration Drilling Cc, , Jnc BO/02./01 Bpfl
80073000SH I'rovidus aubcomm i ttac on Cuvivoiv. rnm gy i, Natural
H/dune 1-3BO ncq fc rolaleil TR nottrti M/D DE-S
* Office of NuclBor MatDvi.il ffafely !c e«PogiiM,rd6
G0073000ftS Notice n f iBfiUanic t< ivdi lob 1 1 i ly of n
BCAFlANUi.n A Ui nnium Recuvot y Llcunivinu Prancli
— B007O10110 "Enbnnfcment Info for North & South Louenberger Re
for Teton-Nedco Ueuenborfl'"' i" situ mining projot*
HERLJHV.D Teton Explovatioti Drillino Go . Inc BD/02/01
B-0072GO3,):! tnjirofihee Jipprec i at i nn fni tip nor luni ty !>ut hat, -no
ru flQ
DICKSDN.F- fi floriculture, DupU of flO/Ofi/17 Ip
BOO7Oa0339 Adviaun tliat reporting identification tjjmbol "XMlf" ha* been
assigned to License BUA-13/3i to be used in completing all
NRC transfer repts
BPARKB.E Technical Plonninn *< Information Dranch BO/03/E7 Ip
EK10717010b Ai-lf receipt of DtB Par U prcijcct t n'^uutli. that M /imi.10
ti D Jphnsori be dolEtoil Prom & 0 CJ'Ofira adiJod to list of ,
interentod citiioni& in Frtmunt CountU'^^
EAST. D Wyflmins Outdoor Council BU/Qb/S'l if
GOO72Q0674 Forwards water levels for niello PNS-L307 Por First qiiHrt
of operation, par NRC B00207 ren.ueBt O/ntasion of data in
quarterly vept uas aversleht
HERLIHV.O Teton EiploratiDn Drilling Co , Inc BO/Ofa/Ofl fipp
BQ0722QQ51 Sutmltc I-EVIBU or DtlS rtt piujntt i amps tiibi J i ly kj/liicfll (•
regional compruhenHlvo planning !< imp si in tin i-irliiin jji e.ia
Dpcumunt la otft'nuotu for egcincu respansitiil 1 tij
MCKIMMCV. H D HoliBjnjj !. Urbor Deve UiprnDnt. I>ept tif aiJ/06/yS I
8007220O63 For mar ft 6 BO 0606 Itr informing that to tlalei author lias not
received info re continued operation of facility
•Operation liae been put in holding pattarn p*nillng NRC
decision re Lnvtmberger Re»ttrvoir« Requests timely reviou
HERLIHV.D, United Nuclear Corp 00/06/17 Ip
HO07310101 HBfipondB to 800609 loitucnt f"' coinmeiit* on Rr'J for tin 1 o '
Pclro leum. Jm. 0i son llasin Pi p jectiFremunt County. MV tivuncil
revieuud DBS Declines commi'iit ist tl. 1 u tlmt*
MALLj L S Advisory Council on Historic f*ri>««t vntitin BQ/Qh/Vl> i
DOCKETED ITEMS
QCKET 40-B76B KEflft-MCHEE NUCLLAR COUP
OO721OO67 Confirms major points of BOOfaJO telton re suiting
groundiaater quality bsscliriH !. evaluation af gr nundLja tor
hydrology at FiM) U -5 1 te
KAUFMANN.R 3 Uranium Recovery Hecnsung Dranth BO/07/O1
4O-B771 NUCLEAR ASSURANCE CORP
0007170259 Responds to 300206 1 tr vc status t. rosponsib i lltieo fpr
emergency pi epairodness in facility environs FEMA has lead
r«sponsibili ty in offaite em urgency planning
ORIHESiH K Emergency Preparedness program Office BQ/QJ/O? Epp
BOO72706f)2 Requests documentation that futuro c orroapondence re
facilities be addressed to P Zaralias Requests that WA Monti.
MF Shatkoutki fc JM Mak*p»ace be placed on d Utribution for
some c orresp ana once
ZARftKAS.P Consolidated Edison Co of New York BO/07/H4 lp
007320060 Forwards application for source matl license permitting use
of tiranyl perQ'idu t< ammonium dim-ante in in situ pilot
scale testing ID recover U Nuclear Assurance Corp will
operate projecb For AZ Public bvc CQ
WARD.fl Nuclear Assurance Corp BO/0&X2O 2pp
I Financial Information
6007240137 Foruifli'd« Annual Financial Rept 1779 ,
ZARAKAS.P Coniolidoted Edison Co nf Neu York BO/07/13 lp
-BQ0723QQ73 Application For source mat! Intense jiormittina » * " of
uranyl pfrroiidc li ammonium diursntc in in astu pilot scalo
Overslic drauings !i supporting documents t i on encl
DECK, H K Ariiona public Service Co HrtRD, n Nucloar Assur.ince
Corp 00/06/05 300pp
-B007?20O77 "Site Fac i 1 i tg Ljyout Peternon In 3itu U Eitraction
Project "
» DrtlofF Mintral Services Corp (tubs of OrtloFP Corp > B870D
HO/Oa/12 lp
—8007340129 Annual Financial Wept 197?
* Consolidated Edison CD at N«ui Vork 00/02/26 43pp
0 Advisors Committee on Ruactor Bafoguorda roports & eorreapondence
0007320308 protfidoa summary of aOOS07-OB moetino u/utils T-B core milt
accident scquencea (Jtils appear to Bipoct NRG to resolve
problems A do nothing to mitigate consilience* of Clai* 9
accidents
CATTON. I California. Uni v of, Los Angeles HO/O9/10 6pp
-8007230082 lhSnlar Evap nrat i un [i«servoirs F'otei-son In Situ U extraction
Project "
JEtlNEK.J A Affiliation Unknown BOX02/1S III
P Operating licansv *tage documinti E< correspondence
B007330099 Kenuastt Biibmittal oF ppopomd T«ch Spec changes providlna
for redundancy in decay heat rcmnva] capahilitij in all mode*
of operation Mud*l Tech 3pECt which would provide acceptable
resolution end tor guidance
EIBEKHUT.DO Division or Licensing 00/Oi/ll 62pp
JOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES
OCKET 50-E UHIV DF MICHIGAN HEbEARCH R£rtCTCR
Inspectioni repjirts, IE Bulletins !< torrespondeucc
00717OAS7 Forwards. IE Circular B0-14i "(iadioflc tive Cuntaminat i on of
Plant DEmicii?ra] i t ed Water Eiyn ti Resultant Internal
Contamination of Personnol " Mo «ui itfcen response required
«EPPLER. J 0 Region 3, Chicago. OFfitE of the Director BO/06/31
SO-3 INDIAN POINT STATION, UNIT I
AdjudLcatorij carrespurtdonte
0070a&4Hl Foruiarils 800619 order revoking auttinritg to operate
facility l> directing util to sulim! t dot ummiEii oning plan
within 1EO days
DENTOMi H R Office oF Nuclear ftcactnr H& guSa 1 1 on, I) true tor
HO/On/19 Hpp
D007030AS5 Oriler tevukinsi authnritij to Jiptralo f
DEWTOH.H R Office of Nyclear Reactor ftt'flu 1 fltlon,
BO/Ofa/19 Spp
007aiO-2flJ Forwards Comm 1 5.51011 BOOB27 rnofnoranrtom !r prrior containing
decisions on UCS 7B05O2 petit inn for ret oiieidcrn tian at
7BOJJ13 IHBUIDV antlum tt order UCfa 771104 petition sought acllon
re fire protection For elcctritjj cnlili>«
EISEKHLIT.D Q Division af Licensing BOVO&/Hr> n9ji |>
t5070')0.2l5 Ordpr gi <in ting B.lenoion until 000723 far Commiss i an tn
consider uhe-tl.tr to levieui rtl.AB-ISt d portions of1 ALAB-liil
<in.» r- . i- npflt(f Of the Becret.iiMj of t-h o Ccmpi^aion 00/07/07
inq eirtension until BOUB01 for CcmmisBlUit lu
AI AK_n>);, j, relev.int (lartiuris of
tary of tlie Cummlssion 00/07/10
nt fartflr rs Indian
public
nnd Por
BOO7010I10 Notification nf 000635 meeting u/util» fc Sandia Labi in
Betheada.HD for presentation of overvieu of facilities rltk
study Uganda enc 1
lEFirtFL, 8 L Reliability fe Risk rttsuasment Drancli CO/06/ li 3pp
BQ07O70279 Forward* info updating (H>0309 1 tr ro control room
hjfaitabilittj Drawing available in Central Tilea only
ZAJIAKAB.P ConnoUdfltod Ediion Co of Haul York BO/07/01, ipp
6007250001 Requests nubmiltal of application for amend to llcente
consisting of Tech Spue thanQ»* tt license condltiont PWR
Hddil Tiich Bpcca t< Moilol liconao condition* for TMI-2
Lessone Loari>»il Category A item* end for guidance
[ZISENHUT.D 0 Division of Licensing t3O/O7/O2 69pp
D007H0393 Foruiords "Preigran Plan for Performance Tasting of PWR
Safety I- Belief Valves, " Keviskon l.^ddraislna WREO-097S
Requirement HIS
VOWWODftHL.il C ConHiiriml's POUIPT- Co HO/07/OH lp
— S007I4CXWH "Program Plan Fnr Performuncn Testinp, ft PMR Safety fc
Relief Valves. " Revision 1
* El He trie Pouer Rcsearcli Institute DO/07/01 9Qpp
0 IninuLtinn report*.- I(£ liullotina !. c orrispanditncir
ropuariln IK Into Notice 00-3*1, "Breakdown* In Contamination
Control Programs " No written romponse required
OFIirR.ll H Roflion 1. Pli i Jado 1 ph is. Office of tlio Director
BO/05/ ,2(J lp
00070 1 0'lBi' rorujard* IE Info Notice Bu-^3. "Lo»a of auction to Emergency
TeedwatBi Pumps " No ojrlttuil Tesponau ronuired
ORlCil.D II llcglon I, Ph i 1 adu 1 ph la. (Iffico of tha Director
BO/OS/29 1 p
<!0070100m Ilcspnnds to IE Bulletin CO-OS), "Vacuum Condition Roiulting
in IJamago to Chernira] Vol Control Sya (CUC9) Holdup Tanks "
ftll Unit a Unta that lould contain primarg sy» water hav«
adequate prott'c tion Bullutin nnt applicatile t-o Unit 1
CrtlULLr W J CunsoUrintoil Cdlson To of New York 80/Oi/OA 3pp
I1007020U/7 Torwjiriln rpspo-nse to IE Bulletin OO-lHi "Duefly Hoat Removal
BIJB nperabillty " Bulletin not .ipplic^ble to Unit 1 which
ia in ilef in Jed condition Eiiiting Unit 2 procsdur»s provide
for adequate ulternatH inojins for removal of decay h»at
CAIULU.H J Cnnaolidated Edliioii Co of Now York 00/06/06 5pp.
R007ai095H Forunrdo It IitPo Nuticc tlO~'Jh, "Evaluation nf Contractor
Oft Programs " No uirttten rosponse required
OiHED.n H Rogiun 1, Philadelphia. nffice of thu Bimetor
ao/Oi/10 lp
DOCKETED STEMS
13
8007160341 Forwards IE Info Notice 60-27. "Degradation of Reactor
Coolant Pump Studs " No specific action or response
GRIEfi.D H Region 1. Philadelphia, Office of the Director
flO/06/ll lp
8QQ717O3S7 Forwards partial response to IE Bulletin 80-OA, "Engineered
Safety Feature <ESF> Reset Controls." for Unit 2 Unit 1 was
shutdown 741O3I t, in defueled c ond i tion. therefore bulletin
not appl Icable
CAHILL.H J Cnnsolidated Edison Co of New York SO/06/13 9pp
B007020710 Forwards IE Bulletin HO-19. "Possible Loss of Emergency
Notification Sys (ENS) W/Loss of Offslte Power " viritte-n
response required
CRIER. B H Region 1. Philadelphia, Office of the Director
BO/Oi/lB lp
8007030497 Forwards IE (.ircul.ir 80-15, "Loss of Reactor Coolant Pump
Cooling EC Natural Circulation Cooldoun " No written response
requlrad
GRIEF), B H Region 1, Philadelphia, Office of the Director
80/06/20 1 p
80071HOSiO Responds to IE Bulletin BO-Q9 No Hydramotor actuators useil
in any Unit 2 sof ntg-relatud oys Unit i presently in
defueled condition
CAHILL.W J Commonwealth rdl&nn Co QO/Oi/20 lp
B0071S0392 Responils to IE Bulletin 80-10 Investigation revealed
potential for nonradioactlve nja to become contaminated
through Isolation valve seal water/city water interface
Double check valves installed Monitoring program described
CAHIU-.H J Commonwealth Edison Co 60/06/20 Sp p
OOO71(bOfiBB Forwards IE Circular 00-14, "Radioactive Contamination of
Plant Demineral 1 1 ed Ha tor qys t< Resultant Internal
Contamination of Poraonnel " No written response required
ORKifiiD H Region 1, Philadelphia, OPPHe of tJie Director
BO/Oii/24 lp
HOO7210172 Forwards IE Inrn Notice BO-24. "Loui Level fladiuasto Burial
Criteria " No writtun response required
H Region 1. Philadelphia, Office of the Director
IP
8007230106 Foiiuards IE Bulletin BQ-lc.. "Potential Hi sflpp 1 i cab 1 on of
RoBBmount lite Models 1151 (. 1152 Pressure Transmitters
U/Efthor A or D Output Godot " Written response required
IE Circular 80-11 also enc 1 No written response required
OHIER, D H Region 1. Philadelphia, Office of the Director
BO/06/27 2pp
R Periodic operating reports !< related correspondence
HOQ717036P Forwards "Annual Environ Hunitnring RoptiPiirt D Radiological
Ropt "
CAHILL.H J Consolidated Ed i ton Co oP New York F30/OA/30 lp
— 8O0717036S "Annual Environ HonitorJng Rept.Part El RsdioSoglcal Rep t "
» Consolidated Cifison Co of New Yorfc SO/06/30
800713066? Submitn dnilij fish counts from Intake screens Fpr June WQO
MONTI. W A Consolidated Edison Co of Now York 00/07/10 17pp
B007210473 Forwards util 000613 Itr fc "Quarterly Rcpt on Seismic
Monitoring Network in Vicinity of Inifinn Point, NVi
Con Ed Project Dec 1977-Feb 19HO "
DAVIB.J P Consolidated Edison Co of Noui Vork 00/07/34 2p.p
0007220533 Formari)» "Daily Count from Intake Screens For June I9HO "
Consolidated Edison fa of New Ynrk QO/07/19 lp
00073103B3 Fornraids phybica
10CFR2 790)
CUNNINGHAtl, Fi Ponn sy 1 vanla Btacn Uni
unty Man Plan uiitlHiuli) fref
QO/07/dS in
Q Inapt-ctton re|jorts, IE Bulletins J.
B007l60BOii Fovuiards IE CircuJai QO-14, "Hud ioac 1 1 ve Cont.imina 1 1 on of
Plant Deniinural ned Wdter Gi|5 *! Resultant Internal
Contamination of Personnel " Wo luntton response re-nuir&d
CfilER,!! II Region i: Pli i ladelp hia, Office of tht> Difettor
BO/06/24 !p
S0072SOI34 Forwards 1C Info Notice BO-J4: "Lou Level Rdduaste Dona)
Criteria " No luntten response required
ORIEH.D H flegiDii 1, Phi lailolpfua. Office of the Director
ao/06/aa IP
DOCKET 3O-10 DRESDEN NUCLEAR J'OHER ETrtriON, UNIT 1
D NRC Draft/Final environmental Sentiments, siippls !( corr-espondence
B007IOO31Q Responds tn B00530 1 tv requesting comments on DCS MRC
concentrates review of otlior ogenciob' EIS on areas of
electric power, natural gas I, oil pipeline industries or
where st.ifP haf special eipertisc in evaluating EIS
HEIMEMANN, J M I'udoral Energy ReguUt-ory Commiailan 80/06/12 Jp
B007070263 BuBmits comments re- DF£i for prel iminarg cooling sys chemital
decontamination at facility Recommend" that NKC appoint
commissions to eiamine docontiiminatiun process Findings
should be discussed at public hearings
PLANT, R L Affiliation Unknown HO/06/27 2|ip
a007lOOaiB friticlies NUREB-0/)B6, TtES rB Jirimnrij cooling sys chemical
Jecontaminati bn DES totally deficient fi fails to address
proDleniE u/rof urb laJi ing non-nuclear pouur plants for
olongntod operating times
LEU1B,H I Affiliation Unknown HO/06/20 lp
U007070261 Provides revieu of DCS, M.IIJ 1900 NllnCO-OfcB6, re pplmnrg
coolinjj sgs chtmicH] decontamination Qnggeets e-nvlron
monitoring section be adileit Personnel training aiJenuato I y
assures ALAfM eiposure levels
HCAVER.C L HEW, Pep t of, IK Public Health Service OO/Ot/30 2pp
8007090269 Comment* on NUREG ObBb re DCS fni decontamination of plant
Hhpro data is unava i lab le, programs Dhuuld be undertaken to
dealgn Si evaluate specific degradation pri)cedurpn
CRCBftri.D A Princeton Univ GO/07/01 3pp
S00716094O Ack receipt uf DCS TL primary coolinn lijs chemical
decontamination Di bappointod that rtjit reiterates items
originally raised about dangers accompany ing operation fc
contains no neiu info re decontamination problem
DANflSZAK. L J Washington Unlv BO/07/0! flpp
S0071fl036tl Bubma ts concerns re dptommi',61 titiirig of Facility Disappointed
that UHS does not d^drosi, JTIIJ ni'U prnblemL, urujcct mill
crento NFlr slionlfl consider Isotope miyration '' srlpiiiiote
experimentation of amount on r<id lonui. 1 1 ties removed
HANASMK.L J Washington Univ (30/07/01 4fip
B007230ft4'J1 fOIA lequitt
decontamination of fac
(jnLOSMITH.R Citnens
for five tfltegnries of iJccuments re
for a Oetter Fnv ironment
BO07220324 "Daily Count from Intake Screens for June 1980 "
» ConBolidated Fdison CD of New York BQ/07/JS -IfP
(1007230^33 Discusses DEE> re pnmtiry tooling : y a chemiral
daconbannnation at futility pcilympr t. giound ,\rp only
tontoinment Fnr uiattn? flesponai" to teiicluny jivofclomi, i!
reasauring Many ilotjbla aiist wpnulu tufety .it sl.ike
J Affiliation UnkitniDii SO/ 07 /Oft ,2pp
T Hearing tr.tnEcripts on non-antitrust matters
B007140OS4 Unofficl«l transcript of 80Q62i lirifffln} on rue ommenilati ona
of Indian Point Task r»rco in Washington, DC Pp 1-62
VlsugrapliB encl
* Commission QO/0&/26 i^PP
8007240164 Transcript of BOO 711 public meeting in Wash ing ton- DC Pp 1-6
# Commission 00/0//11 6pn
000733018^ rorwards NUREQ-OfcH6 IB DEO Fur pi imary tooling sys
docunt-tminat lun *• relrfted HI notire Cnmments mus-t be
received Ijy 000731
EISENHUT.D G Division of licensing eO/t)?/09 IP
— 13007!;ao^05 Protests .jgainai piopcictd decuutamiM) ion scheclulsib For liar
Urges CIS tie prepared t< public hturings be held iriunedid tolg
RDGCNTHAL,/! -J Affiliation Unfcnoion 00/0 5/K) ip
DOCKETED ITEMS
lOVBjJOJEte Comments un [iropOKed NRC, DDE, DDU Chemical Co. [, util chemical
dot C"ntiimin,ition doniunstrfl t inn project as described in draft
Kit., NUFitG -OdEMi rjprosiDs conn.rn re possibility of accident,
effort on uarheib I. public
rjllEV.H AFFiliutiun Unknown 30/O7/16 9pp
H007i!TOij21 Discusses NUHEG-OibBd. DEB Antic I pates no significant effect
nn FnreEtud land from decontamination projects Shutting
down rcflctui mould rosult in const af alternate plant, ui/
considurati 1« L'ffect on vagutation
Ag r i culture, Dep t af. Forest Service 80/O7/23 Ip
)072£03'!3 Comments on draft Elb. on dec ontarru mat! on. I
Document is rehash nF old responses Safely of proposed
operation not pi Ovorv
3.1! Affiliation Unlnpuin UO/07/l(j 4pn
Submits tiirnmenU un NURCG-OfaBfc, DEB fnr decontamination of
facility Corapar.iliue data on leatti rale*, aol idi f itatlon ft
rates between UfJL f. DOW should Le shnuin in tabular farm Info
is currently unclear
VON ZULLtN.D VJ Woi them Illinois Umv F30/O7/IS, Dpp
.•>O7Sr20-5J9 Commcmls un NUJiEO-OAg6. draft environ fttatoment ro primary
cooJina ays chemical decontamination docs not evaluate
occupjitlDn.il or public radiation eiposurn i osultlng From
serious, vehlclii accident cturina; transport of nucl*ar uonte
OUTHiR H UPC Fee-logical Ae lot IfltBE RG/O7/17 Ip
007230513 F«ruanl» questions ra May 19BO DEB concerning primary
tooltna ays chemical doc ontaniiria 1 1 on EIPT-DEBBII doubt re NRC
snfety evaluation af area volcanic Si seismic activ i tSh ei tlnu
preiviouisli| documented radinimclido miSjTation
HCCAULCV. 1) U Affiliation Unknown BO/07/17 Spy
007a3Q(i<lA Partial rosponsa to FOIA lerjuo&t far five tat-egorlo 5 of
docuitipnits re decontamination of facility Documents re Item
B ean be found in 1C map rents in PD/t Search ts rurrentlj
underway for do-r umenl » und-nr Items 3 J. 4
FELTWJ, ,J h Division af Rules and Records BO/O7/13 Spp
-B007ail06b'J Disiuanua proposed plans for dlnpos^l of wastes from
facility ilucorilamlnnUDn oper.it ion Pnividna detailed
d Blnrlp 1 1 on of disposal mo-thod Disposal method fount!
flc c eptdb 1 o
MAIiTlN. J 0 Division of Hast* Mfmug c-mtint DO/&3X05 2pp
-"0007830*71 Submits names oF Div of Wdste Mat attonrteea at fncllity
snliillf Icatmn test & i>dcntifliM> teats that licuneve should
P PI- form (jnl Id i Pita* i on procedure sdoitld bi> documentedi
including temp, mntac t pr-oesurif t>o(, i itiin-cc ti visual insp
MAfiTlM. J D Dlvlaion Of Woste Management QQ/0(j/!O Ip
~ H007y:fOi7H Provides MRC floonOa Fur snUdi Fl cation demonfltra t ion at
Pacllltij
JANfCEKiB D Commonuieal th Sdtion Co BO/ 07/02 Ip
1007aaOB-4fl ForuBvJB commetitt Dh DEB M) cliBmlcol decontamination of
facility DE5 inqaequate to sorvir <>a moilBl Par similar
decontanviraat limn
ODLDBM1TH.R Ciliiuns for a Butter En«lnonmBnt 00/07/10 26pp
CnmmontB nn DEB ro pTifnavu cooling 9ys chamicol
de-EDtitariUna t inn fit fucilltij DBS PfllU short of being
completB. dotfli led t< fully documtfnted Public comment period
should bo eitvndc-d Buppcrtivu Info «ncl
, M J- nilnoia Safe Gnnrgij Allldncv 00/07/10
BO07ES053/ Comm&titii nn OES re chamtCA) Jecqntamln.iti on OES in doflclnnt
b luporPlcial In nnalyii* Environ impart of Putor-a
docontumina tloni. should IIL- (omidOTorf since iJccun torn lust ion
of plant mill Burve- as mailol
OOLDBUlTH.n . OJNflBURO, R CitlEitni For a Hotter E^nvirnnmnnt
BO/07/IQ S'-ftp
Comments nn NURF,G-Q&8fcp Uraf t E33 nacumnnt riefectiv» !• does
not ailQquatdlu dlicusu pasBJbli? til tornntive* to propoied
nctlnn Ratloniiln fur n-ted of propiovd action not dewelapii)
MOHTAOUE.P Nutian.il Cumpoign For fludioac tive K«Bto Softtij
BO/07/20 I6pf
ao072B039!i Cnnnnantt nn NUITE3-069&. "nea for Primarij 9y* Chemical
DitciintBmlna.tl.qfi " (luestlons tuccDBjltij of prBparntion of
environ atotDineni for Action uhiifi has minor impact on
public t< Dn/n nn, c i>ns x derinu, rust InvoJv^ii
F Cnmmonuiej] th Edl»an Co BO/07/21 I3pp
H0072S04S1 Raft, LIB & requetta Info re poMttvu I. neantiva ofptctE of
uelng uther def unLnraina ling .igwnts ttiflt might ivnt contribute
to Increased i o<Ji onw( 1 idiD mnli 1 1 itij
LEVER INd ft AffiUatian Unknown BQfQ7/%3 If
pwarili i,iiiuim«nt» un NURtTG-II6B& in propaseil rumovjil of
radtoaitive iruii PPOPII mterjot of fiiclljti/ No juslif ication
for- convlonon H.db1 no *igmlfirant Diiviron imiiat t iui 1 1
T»»UH from Oeiruditins
COQDL.E Ci nidus Ayainitt Hut) ear Pauar BO/07/ S3 llpp
Fnruarde c ommentE. correcting neveral inocruracios in DEB for
primary cooling sy& chemical decontamination HBronminndn that
NUC prepare generic b"IS Identifying available luaste
treatmont t< dispocal uptinnn for other plants
Environmental Prulection A|)cncy QO/O7/Hfi 3fp
F Security, medical, emergency & fire protection plons
0007010347 Forwards safeguards contingency plan emend Plan withhold
(ref IflCFF),? 790)
PCOPLEE," U Cummonuealth Edisnn Co SO/O6/37 Ip
H007240H5O Diocuaoos revleui c-f fire protection mods Forwards evaluation
status, evaluation oP denign details h r»vl«ui of It edit 333,
"Fire Milter 5y B l-'eaoE" & 3 2 4. "Eiposc* Structural Stool "
ftddl info ri?q.i>EEt ed within 30 daya
CFfUTCMFIELD,!) Operating Reactors Branch 5 60/O7/09 9pp
0 Ail|udicatory (.orreBpontfenco
H007170n23 RenpandE to 79O?3O petition re proposed cliomical
decantaminntion at Pacility & pruparflt I on of E1S Potition
combined ui/K Dray patition >duo tn Bifnl lar i t lot
EIEBNIIUT, D Q Divialon ciP LiconBinj BO/O6/11? Hpp
— 6007170330 nettponda to 790319 petition reruns* Ing that Eia be prepared
ro propoaod chemical dBContamlnation at facility Petition
for action hoc boon Qranted Public meutlna will he held In
vicinity of facility to discuss NRC Pinitino'B
DENTOWiH K OfPUc of Nucleflr fiffactor Rtfgulation, Director
BQJOb/ZI, Say
—0007170333 DlroctorJ6 decision under 2 306 detnrmininn that EIB should
be prepared for Pac 1 1 1 ty dec ontamina tion
DEHTON, II li Office of Nuclear Reactor Jlsgulatiun, Director
(JO/06 /3i 31pji
—0007170^16 Notice of issuonco of director's decision under 10CFH2 206
ro prupaintion of EI9 fnr proposed dBcontaminntion of
facility
OKNTON.II fl Ufflce of Nuclv.tr Reactor Rngulatlon, Dlrettor
n0117IBOO'ia Rcaptnuli to (30O3IO patltlon r-u ppopointij chanilcal facility
decontamination ti proparatlnn of EIB Petition uos conlilned
y/simliar potltion fllotl by V. Drey gn 790319
EIGENW*T, D 0 ntvioion of Homing OO/06/19 app
— B007inoif)7 Foru-iiMJit potition roquettino preparation of EIS,
ODLUBMITH,!! Cltlmnv for a Hatter Environment, BQ/OH/13
3pp
Petition for prenaration oP EIS on proposed cliomical
ducontaminat Inn Decontamination Is major fedaral action b
»lgnificiint)ij tif f *c ta human environ
aaLDBHlTH.fi Citiiens for a Potter Environment BO/03/13 lop
J Foriuordtt CommisBlon P00937 niBmorandgm d ovdtr containing
dncliioni nn DCS 70O90H petition for r«t tins iteration of
7fl04ia momoraiidum I. or(!or UCQ 771101 petition Bought action
ro Tiro protection for electrical tablet
EIHEhJHHT.il 0 Division of LlcDnilht 80/06/aB B9pp
Petition r»qu«stlng lioarlngs on C1Q ro tlismlcal
dacontamlnatlon b on nppllcatlan for OL amend States
Intoroat nf nutlioi s I< K Drny, D Rorvm & H Shinnflug
OOI.UliMIT)l,R Cltliann for a Dotter Envi roiimnnt GOLDSMITH, ft
Prairie Alllnmu BDLUaHITH, n I Ulna la Bafo rTnurgy Alliance
DO/07/00 3pp
H Oeritfral corroBpOtidenc a
H007QH01B3 nusponila to BO 03 if t, 0414 ltr» re EIS preparation Rnclpisnt
will receive tHrector's derinlon under 1OCFR2 206. E 19 b
NltC comments when available
EIBENHUT.O 0 Rivittton of LiconsinB 90yOfa/19 3pp
iSutmlts iiuosttona m V, Broy 790319 request Ii CitiiBiis for
Hotter rnvirnn ElOO^ln potition for EIS on pfopatoil
dBconlatninat 1 un
QOuDSMmi.n Citii»nB fnr a Dottffr Envlr-onimint BO/03/19 3pp
15
— 80Q70a0203 Flequoats tii be notified uhon decimon is madp re Citucr
for Better Environ 81 other groups' petitions For EIS tin
prop tiled decontjiminati on
GOLDSMITH. R Citiiena for o Better Environment F30/04/I4 2pp
B007OB0063 Responds to NRC BOOS15 requtet for ad i) 1 info concerning
adequacy uf station electric distribution !>i|s voltagos
JANECtK.rt F Commonwealth Edison Co BO/Qi/ao 4pp
8007140330 Responds tn 800324 roquott for info ro K Maaterson B003IB
Itr concerning burial of railwasle from plant In IL at
disposal site In Deatty.NV UI&CUBSOH disposal site
conditions Draft EIS fur decontamination end U/o ericl
DIRCKB.W J DFFico of the EiecutivL' Director for Operations
HO/O&/27 Opp
—8007110231 Forwards K Master-nun B0031B Itr re burial uf radiuaate
From plant In IL at disposal site in [Joatty.HV Roqueets
Findings b views
tAXALT. P 9onato HO/03/24 3pp
B0071B043ii forwards evaluation nf ^EP Topic V-ll A ID requirements fur
isolation nf high f, 1 ou pressure sys Requests nwti 1 1 call on
if as-built facility differs Fi Dm licensing ba-sis assumed
in assessment
CRUTCHriELD.D M Operating Reactor-. QrancN 5 9T/O7/OI 5pp
H0071BQH3E) Forwards evaluation of SEP Topic 111-10 A re thermal
overload protection for motor operated valves dBrjuosts
notification if as-built facility differs from licensing,
basis assumed in assessment
CHUTCHFIELD.D M Operating Reactor? Branch S SO/O7/OI Spp
0007310083 Responds to E Oogek 000413 Itr tn IL state «
copy of NRC response
EISENHUT.D 0 Division of LiLDnuing BO/O7/1O Ip
—6007310023 Forwards DEB ft related Fll notice, in roaponsc to Itr to IL
State Senator fiM Dalnu,
EI0ENHUT, D 0 Division of Licensing 00/0/7/10 lp
P Operating license stags document!. & corrpapondenco
B0072S033B Forward* NUREO-OM1?, "HWH Feeduater Motile & Control Hod
Drive Return Line Noizle Cracking." for review d comment
CRUTCHFIELD, D M Operating flu actors Branch 9 BO/04/01 2pp
80O7Q10M6 rnrulflrda final rulo published in 000309 Ffi amending
10CFR50 71 to roquirH periodic updating of FBARs CompliancB
ia not roquirod until completion oF BE'1
CRUTCHFIELD. D Operating lloac torn Branch 3 80/O6/10 Spp
8007310295 Forwards evaluation of "SEP Topic V1I1-1.DC Power Sys Bus
Voltage Monitoring t* Annunciation " Requests thrft NRC be
Informed if ao-built facility differs from daaii assumed in
assesament
CRUTCHFIELD, D Operating Reactors Branch S SO/07yOl 3pp
BO07850032 Foruiards "Loaa of Offaito Potunr - Hurvtsy Status Rapt "
Replaces 0006 11? rept uihich Omitted Table 4
CRUTCHFIELD, D M Operating Reactors Hranth 5 00/O7/OB 3pp
— 8007250035 "Loss of Qffsite Poiurfr - Survey Status Rept "
BCHnLL.R F Plant Systems Branch (Pro 791030J SO/07/00 lOpp
BO072B007d Responds to B003IO Itr tn J Aliearne object ing, on behalf uf
ounors of plants under SEP raviou, to current plans fur
elpoditod rovieui of environ qualification of electrical
equipment Forwards applicable memorandum !, order
DENTONrH 1 Office of Nuclear Reactor Regulation, Director
QQfOT/li, Ipp
B0070Z01Sci fiequesta coo|iora 1 1 on
prohloms in nuclear industry
CnUTCHPlELD, I) M Operating Roactors Branch 3
n NRC study of penp 1 e-ra lated nccurity
BO/Ot/11 3pp
Q007O10043 ForuiardB NRC avalitation of btiP Topic V-5 re RCPD iHatBflB
detect ion Ro quints info concerrilng util as-built facility
dlffaring from licensing bams assumed in assessment
CRUTCHFIELD.D M Operating Heactom Hrnnch 5 (lO/<Mi/12 3pp
HOO7010H17 roruarda NRC ovalnitiun of SEP Tuple VII1-4 rq- electrical
penetrations of reactor containment Ruquosta info concerning
util ao-built facility differing from licensing basis
JSBUmad In flOfiuaament
CRUTCHFIELD, D M Operating Rauctoru Branch 5 BO/Ot/ia lOpp
S0070 10272 Foi wards ovaluation of SC[> Topic V-12 A re uiator purity of
UUR primary coolant Review romploted t> resulting evaluation
will farm input to integrated safety aSBBBimert unlffse
Changes are neBdod tn roflect as-built Londitiona
CRUPCHPIELD, 0 Oparatlng Roactom D ranch 3 00/06/13 3pp
8007100397 RH9pond» to B002G1? Itr which eipreasod opposition to ACRB
rncofflmanilatlan to rostriicture SEP Role of licensee* In
prosram will eipand Ltr forwarded to CommioflionBra
DENTOHiH B Office of Nuclear Raactor fioijulatinn. Director
80/06/1B 4pp
Inspection repui ts( IE Bulletins Ic tui-i espnndenco
aa07010M)& Advises that IE Bulletin 79-01 E, "Envintn Hual 1 Ficatton of
Claes IE Equipment." uas sent to listoJ utits on QOOI lib
C/iHROLL,D IT Region 3, Chicago. Office' of the Director 00/01/30
3pp
00071103-15 forwards IE Dullotin 00-13, "Cracking in Core Ejirau
Bparuers " Written response requirnil
KEPPUER-JO Region 3< ChUago. Office of the Director BO/05/12
IP
BO0707007H Foriuards IE Insp RoptB 30-010/BO-09, 50-237/aO-OD t
30-349/BO-ia on B00407-QSD2 fc notice of violation
KEPPLfZfi-J G Region 3- Chlcagg, Office of the Director QO/05/S3
3pp
— 3007070074 Notice of violation from inap on 800107-1)503
* Region 3. Chicago' Office of ttie Director BO/OH/2^ I>pp
— B0070700BO IE Insp Repts 90-10/80-09. 50-237/BO-09 !< SO-341/BQ-12
on QOO-lOJ-OoOS Noncomp 1 lancce noted failure to adhere to
Ort program requirements fontamlnatod clothing found lying
Inside controlled contaminated area
SPE5SARD.H L . DrtRKEfl. J L . TQNOUG. T M Region 3. Chlcagoi OPficc
of the Diroctor ao/OS/33 7pp
— H007100420 E*preSBBs opposition to ACRtl recommendation to restructuri
SEP For BEP oiuners to perform safety onalysls as outlined,
cost in dollars t< man power uould tncreaEe drnmntical 1 ij
SCHAFFHTALL, H BEP Qiunern Group 00/03/27 3pp
B0070200A5 Foruiarda IE Info Notice fiO-HB. "Breakdowns In Contarninatinn
Control Programs " No uirlttcn response required
KEPPLER, J 0 Region 3. Chicago. Office of the Director BOJOSfSB
IP
Q007030479 Con firm* nrrannanicnta fur MA Williams to rev Sou Doui Chemical
proprlutarij Info ra formula for N8-1 solvent Infa it> being
made avail sill* u/undorstandlng that info mill be withheld
(r«f 10CFRB 790)
CflUTCHFlELD, D M Operating Reactors Branch 5 HO/06/19 2pp
B0071604S7 Forwards "Lose of Offsite Power - Survey Status Rnp t "
Raquiiti vleus re causes t< possible remedies uithln ISO
daija
CRUTCHFIELD, D M Opuratin9 Reflcloi 6 Dranth 5 BO/O^/i1? Spp
S0070100B6 Forwards 1C Info Notice 80-23. "Loss o P Buetlon to EmergEr-
Feeduater Pumps " Mo written response required
KEPPLER.J 0 Region 3, Chicago, Office of the Director 00/05/3*?
IP
0007010150 Advises that IE Info Notice 80-23i "Loas of Suction to
EmBTjoncij Feetfiuatcr Pumps, " uaa sent to listed utlla on
0005B9
PAPPAQ, H Region J, Cnicago, Qfflcc of the Director BO/OH/30
3pp
— S0071604i3 "Loss of Offslto Pouier - Survey Statut FJept. " Revision 1
BCHOLL,n F Systematic Evaluation program Branch 00/06/19 9pp
8007O70UA BubinltB rovisod rosponses to NRC 770603 Itrs re
•tcond level of undervol t»fle protettion Foi t \V emergency
pou«r bucam supplying lafety-relatod louds
JANECEK, R P CommoniuaaUti FdUon Co 00/06/26 4pp
8OO70H027B Advises that IE Info Notlcff BO-2B, "BrcakdoiuTiB In
Contamination Control Programs," une sent to listed utils
on S0053B
PAPPA9. H Region 3, Chicago, Offict; of the Director BO/03/30
3PP
B0072S0156 Foruards IE Info Notice 80-26. "Evaluation of Contractor
QA Programs " No written response required
KEPPLER.J 0 Region a. Chicago, Office of the Director BO/06/ 1O
16
DOCKETED ITEMS
BOO7O2Ofi62 Forwards, si l*-apec i f I c t. generic questions re GE disc
cracking Indications per BOOIO9 meeting ti IE Info Notica
71-37 on Meetinghouse lou pressure turbines die: crack a
Response requested tuitrtin 3O day*
CRUTCHFIELD. D Operating Reactors Branch 5 BQ/Qfa/11 5pp
B0071S0509 Notifies that time clot* of Item a of IE Bulletin 80-17,
"Failure of Control Rods to Insert During Scram at BUHi "
ulll start at IS 01 AM or SOO7OB Test should be Completed
uithin ZQ daijG Requests nuti PI cat > on op malfunction '•
KEPPLER.J 0 lleifion 3, Chieagn. Office of the Director BO/O7/O7
SQ07I4O309 Forwards IE Bulletin BQ-M. "Degradation nF OUR Scram
Discharge Vnl Capability " Written respon-sE required
KEPPLER,J & Region 3. Chicago. Office of the Dii-Bctor BQ/O6/13
HDQ710OOO<1 Forwards ronponse to IE Bulletin BO-O9. "Hijdrflmotor Actuator
Deficiencies," No saf 8 ty-it lated sijs or component at
Dresden 2 !< 3 use-a AH-9O or NH-90 series hydramotor
PEOPLES. D L Commonwealth Edison Co aojQb/lb 3pp
8007030037 Forward* IE Bulletin 80-15, "Possible Loss of Emernancij
NoliFicatioti Sij s (ENS) U/L,oss of Clffsita Power- " Written
reapnnse required
KGPPLER..J 0 Region 3. Chicago, Office of the Director BO/Oi/lO
ip
8007030053 Attvisc5 that IE Bulletin BO-15, "Posaiblu Loss of Emergency
Not iFicat ion Sy i (ENS) W/LoB3 of DFfsite Puuer, " uas sent to
listed utlls on 000618
PAPPAS. H Region 3. Chicago, Office of tho Director BO/Ofi/ 1 9
3pp
B00711D20Q Ack receipt oF BQOaO,9 ]tr in f 01 flung NUC of steps taliBn to
correct violations noted in IE Insp Rept 5O-01Q/aO~00
DAVIS, A D Region 3. Chicago, Fuel Facility b Materials Safety
Branch BOV06/19 ip
8007250641 ll«sponda tn IE Dullntin BO-JO, "Contamination of
Nnnradioac tive Bys b Resulting Potential for Unmonltored,
Uncontrnl led Ruleasc uf Radi aac t i vi ty tn Environ " rtnij
dFFected BIJK uiill be rottrieteJ if cnntamlnation found
PEOPLES. D L Commonwealth Edison CD- QO/07/07 3pp
E300?aa0650 rormarrts rcBponee to IE Bulletin HO-11. "Masonrg Wall
Dulgn " [IcquBated Investigation not performed at Ores (ton.
Unit 1 duo to extended nutago II ei^u ire merits mill be met prior
to startup W/o end
PEOPLES, DL Coramonuealth Edison Co BO/07/07 2pp
B007a30fiaR Foruiarila rDspon*e to IE Dulletin BO-OQ, "Eiaminati on of
ContalnmuTit Liner Penetration Ueliifl " Dronden Unit 1 designs
ulll be revluuod !i foastbility of performing radiogrsphlt
01 aminations mill bo assessed before unit returned to ivc
PEOPLES, DL Commontuealtn Ed i son Ce 80/O7/01? 7pp
B007310432 Foruarda rogponac to NRC 800A11 request for Info re turbine
diic design ti previous insp "roaul t s Providoa only info uhich
was available uithtn roqueatcd respansir timB Remaining info
will be provided prior to startup
JAMECEK.R F Commonwealth Edition Co 00/07/2B 2pp
Fj Poriodic operating vepprts fc related c orrespondencB
--8007110206 Responds to NRC SOO516 1 tr re violations noted in IE Insp
R*pt 50-Olo/Bu-OB Correctiva actions initiated djily
samplicig 'j analijsis program For groae beta activity for svc
uia tfr discharge from sphere
PEOPLES, D- L Commonuoalth Edison fo 90/O6/O9 3pp
BO0723O371 Forwards IE Insp Repts 50-010/30-10, 50 -P37/QO-09 K.
50-S47/GO-13 on BOO909-29 & nutice of violation
HElSHHflN.R F Region 3, Chicago, ffpactor Operatloiii Nuclear Support
Branch BO/QA/1? Epp
-B007a3037f Notice oF violation from imsp
» Region 3, Chicago, Office of the Director
Ip
3007230309 IE Insp Repts SO-OlO/BO-10, bQ~B37JBV-Q1 & 30-2flV/DO-ia on
SOG505-2-9 NonLOmjulianco noted failure tn report events in
accordance u/Tcch Specs
DARKER..! L , EPESSftf!D,FI L Rngion 'i. Chicago. Office of the
Director ' GO/Oi./1!? <?pp
0007020509 Forwards IE Circular 80-15, "Loss of Reactor Coolant Pump
Cooling t< Natural Cirt ulatiun Coaldaiun " No written response
requ ired
KEPPLER.J fl Region 3, Chicago, Office nF the Director BO/Oi/HO
Ip
flt)07170430 Forwards IE Circular 60- M. "Flflill oactlvo Contamination of
Plant Deminaraliied Water 9ys fc Resultant Internal
Contamination of Persotinnl " Ha uintten leiponso ruqulred
KEPPLER.J 6 Region 3, Chicago, DfPice of tlic Direitor BO/Oib/ai
G0071B0333 Foruarda monthly operating roots for June 1900
8TEPHENKON-D D Commoniue a 1 th Ed IB on Ca SO/07/0? Ip
— B0071U0336 Monthly operating roptis for Juno 1900
CIEBZIEU1CZ.S Commonuoalth Edison Co BQ/07/02 S3pp
U Congressionfll/Eiecutlvo Cnrroaponilanco
ao07«aooaK Respunds to B0031S inquiry, re lona-term itorage of
solidified ujastes rosultlna frum d o contamination of primary
cooling EIJO Haste will be shipped to commercial low level
waate burial lite In either NV or WA
DinCKB.H J OPPice of the Eiecutive l>iPOCtor for Dporations
BO/06/8& Ip
Q007020DEB ftcnueBln info about NRC action re long-term storage of
solidified uantes resulting from docuntamlTiation of primnru
cooling sgs
CORCORAN! T House of Rep 80/03/12 Ip
DOCKET 50-13 BAIJCOCK f, WIl.COX CD CRITICAL FACILITY
0 Inspection reports, IE Bulletins & (.arretpondence
B007170137 rorwards IE Circular DO-I4, "nadloactiVH Contotnination of
Plant Domlneraliied Water 8y» & Resultant Internal
Contamination of Personnel " Nn uiritten response ren.uirod,
O'liEIUY.J P Region S, Atlanta. Office of tho Director GQ/O6/S4
IP
B007I-1O566 Advises that IE Bulletin BO-lt> t, IE Circolfir SQ-lo. re
BO3*mount pi-essiire trantrai tiers ti trip units uere Bt;nt to
listed1 utilg on BO 0627
PAPPAS, H ftegion 3, Cnicago. Office nF the Dirot tor QO/Ob/37
3pp
DOCKET 50-30 M(\S3ACHUSCTTB INHT OF TECH RGB REACTOR
ft Inspoction roportsi IE null* tins t c orreipondnnce
B0073303D9 Foruarils IE Bulletin 80-U. "PDten.tial Miisnpp I tcoti an of
Hosemount Inc Models 1131 t, 1 1 UH Pressure Transmi tter a
W/either A or D Output Codes " Hrittun response required
IE Circular 80-16 also eticl No inritten response roijiiiriJU
itCBpi CD i o "egion Oj Chicane-, OfPico of the Director BO/06/37
f?007160DS3 rnruardD IE Circular Qti-14, "Radioactive Cantamlna t ion of
Plant Deminaral 1 led Water SUE h liesultant Internal
Contamination of Personnnl " Mo uiritten rBBponse rBquirad
ORIERpD |1 Region I, Philadelphia, QFPlce of tha Director
(30/06/84 ip
nmg NRC of stops taken to
• 50-01 0./HO-09,
tha Director 00/07/01
8007210133 Forwards IE Info Notice HO-H4. "Loui Level Ffadwaste Durial
Criteria " No written ranponsc req.ulreJ
OfilER.D II Region 1. Philadelphia OFfico of the Director.
00/06/35 Ip
-- ,.-•». lonb noleil in
t< 5<J-24f?/e(J-lS Correstivo
actions i(nBi-oved mgt con-trnls were Implemented Radiatinn
protectior> training classes uere hplil For i onli actor-,
REEB.C Coramonuaalth Edison Cn 80/06/13 App
E Inip
DOCKETED ITEMS
17
DOCKET 50-27 WASHINGTON STATE UNW RESEARCH RCACTQH
Q Inspection reports, IE Bulletins (< correspondence
BOO7100254 Forwards IE Circular HD-14, "Radioactive Contain mat ion of
Plant Dominnraliied Water 5ys t, lieaultant Internal
Contamination of Personnel " No written response required
ENCCLKEN.R H Region 5, San Francisco, Office of the Dii-octnr
lp
8007210474 Forwards IE Insp Rept 50-027/00-01 on BOD6O<?-1O Mo
noncompliance noted End withhold (ref 10CPR2 7901
NDflDERHAUG. L R fiegion 5, Ban Friinc i&co, Safeguards Branch
BO/07/10 3pp
DOCKET 30-29 VAWCE-HOWE NUCLEAR POWER STATION
F Becurityl medical, emergency Ii fire protection plans
8007080310 Requests clarification of NRC emergency plan concurrenci
schedule Facility revised draft emergency plan mill to
submitted bg 900725
KAV.J A Vonfcoo Atomic Electric Co 00/06/30 l|i
BQQ7090233 Forwards Revision 6 to oecurlty plan Plan ui
<rof IQCrRB 790)
MOODY, D E Yankee Atomic Cloctric CP BO/07/01 lp
0007280492 Forwards final revised emergoniy plan per NR(. B00414
comments Requests prompt ruvieui
KAV.J A Yankee Atomic Electric Co [10/07/29 lp
BO0710039? Responds to 800239 Itr uhich c-ipreaBed opposition to ACRS
r-etaniniendtit i on to restructure SEP Role of licensee;, in
program mill eipend Ltr forwarded to Commissioners
DEM TON, H Fi Office of Nuclear Reactor Regulation. Director
BO/06/1B 4-p.p
-— 0007100420 EiprebSBE opposition to ACRS retommeTidati on to re*tructure
SEP Far SEP owners to perform Bdfotg analysis 35 outlined.
cost in dollars & manpower uiiiuld increase drsraa tiL-a 1 ly
3CHAFFSTrtLL, f) SEP Umn&rs Group BO/O2/39 2pp
tlO071BOflfifr Fnruardt pvaluation oF SLP Topic VlII-4 re electricnl
pnnetrat ions of reactor containment Requests not i f LCI t ion if
as-built facility differ-. From licensing basis assumed in
CnUTCHFlELD, n M Operating Oeactors Branch 3 SO/O7/O1
I3pp
8007330001 Rc<iut-t,t« bubmlttal of appl icrtt i on for amend to li-conse
consistiriD of Teth Spec changes f. license cond it i-otis PUR
Model Tech Specs & Model license conditions for TMI-i!
Lessons Learned Categors A items entl for guidance
EISENHUT- D O DiviaJon of Licensing BO/07/O2 &9pp
Provides speciFic ii'fo re aunliarg focdwater pump
endura-nce test All parameters remained yithin normal
operating ranges throughout test Drawing* (. charts enc 1
KAV.O A Yankee Atomic Eltttric Co BO/07/03 Bpp
B007H0300 Submits i eeults of revjc-u i-o anchorage Egs For &afetg
r&lated electrical equipment li&tisri in encl IE TnFo Notice
00-21 tt observations heinhtenod auafenesB of lojving Free-
standing notiseibmic aujillari; items around uhcn not in use
KAV.J A Vankoe Atomic Electric Co 90/07/0^ Spp
0 Ailjudicatorg curr nap undone
D007310243 Forwards Connnisslon aOO">27 momoriindum d order containino
decisions on UC3 7B0302 petition for rBconEideration of
780413 memorandum tc order UCB 771 1O4 petition sought attion
re fire protection Tor electrical cables
EISENHUT.D o Division of Licenains 00/06/25 Q7pp
I Financial informntion
uurutuiut Forwards util 1760 internal cjah flow projections in ordei
to meet rotrospoct i ve premium guarantee requirement's unit or
Price-Andarnon Act
SQUCY.A n Yankc-e Atomic Electric Co QO/06/3& Ipp
P Operating license stage doLumunts t< corre&pondenco
0007160421 Forwards Amend 60 to Lifim&u DPR-3 !< notice of i issuance !.
CRUTCHFIELD. [> M Operating Beat-tor* Branch 9 flO/Ofo/02 3pp
--BOQ7140425 Arnnnd tiO to License DPH-3. odding surveillance roquiriimiMits
for auxiliary Peodwatur SUB in Settlon 3/4 7 2
CRUTCHFIELD. D Operating riuactom Brunt h 5 BO/Oi/Oa Qpp
— 0007160437 Notice of issuance d nvfli 1 oh 1 1 ity of Amend *>O to License
DPR-3
CfluTCHriELD.D Operating Benctors Uranch Q BO/OA/02 3pp
8007010113 forujard* final rule published in BOO 309 Fit amending
10CFH50 71 to require pcrioilir updating of FSAtit Compliance
Is not required until completion of BRP
CRUTCHFIELD- D Operating Reactors Branch 9 BO/06/ 10 5np
8007230099 Requests Hubmlttnl of propnsed Tech Spec changes providing
for redundancy in decay heat removal capability in all modes
of operation Model Tech Specs uJticli would provide acceptable
resolution uncl for guidance
EiaENHUT, D 0 Division of Licensing (JO/06/11 fiEfip
B0071Q0530 Confirms BOO^Bi, mgt mcetinn at sito re flasoHEment of
regulatory pDrformance of facility
ORIEn.n H Region 1, Philadelphia. OTfico of the Director
BO/Q6/1& Spp
B007BB0000 (iequDst* add! info re NRC requirements far auxiliary
foedwatsr 9(js Revieui status ettcl HenueBts rBiponoe uithin
30 days of receipt of Itr
•LAINAB.O C Assistant Director for Safety Assessment BO/06/1/.
Q00711033B Forwards YOQAP-1 -/I, If BVIE 1 en 8. per NFIC H00703 request Alao
forwarde document chnnoo ins ti ucl I ons for removing &
inserting correct pages
HEIDER.L H Yankee Atomic Electric Co QO/mJOl Syp
— aOOTHOSflB Advioos that VOUflP-I-A. Kevin i on B. is acteptoble Programmati
changes should bo aubmitted to NUC for rpvietii (irior to
implementation Rei[uosti that Hr replace 800410 Itr J< THpt
be r«numb erod w/rovisiDn 6 submitted to MC
JlftASS.W P Quality Asior^Tice Branrh 90/O7/Oa lp
0007360076 Reaponids to 80031Q 1 ti tu J ANearno objecting. on b-alialf of
aunera of plants under SEP revioui. to current pl.irit for
eipeJittd reviGU of environ qual I f i cat! on of electrical
equipment Fariuards applicable memorandum t, order
DENTQM.H R OFflce of Nuclear Reac tur Regulation, Director
00./O7/16 Ipp
D007EQD621 FaruardE revised description of proposed vent 5y g Car bnth
reactor vea-Eel hpfld i, pr* Biur 1 1 cr yeaael heaif vent will b«
plr"il dlrectlu to containment atmosphere Equipmojit will be
Installed BKHOJ
KAV.J rt Vanfcee Atomic Electric fo HO/O7/J^ 5pp
BD073BO*39 Bubmits nl ternate (netliod of mitigation effects Qf griU
degradiiti on on saf ct-ij-relfl t od electrical equipment
Engineering for moils wll] be Lompl«tpd by Nov 19BO
VANDENDUJtGH, D Vftntoi! Atomic Clcctrlc tu (10/07/23 7pp
DOO72Q03B6 Discu&fiOt commi tmuiil to in-atall containment hijitrngeci m-onttnr
bv 61CHO1 DeBCrlb*^ cnmpliancv u/NPit 79]O30 Itr Sjs mill be
composed of l!entti< analijier t> Combip. Inc . Itodn 1 K-l!l fiermal
conductivity an<ili|iur
HftV.J A Yankee rttomic EJertric Co BO/07/P4 Ppp
EO 07280 A26 Requ«bts that evaluation of prapucod mods, re Lessons Lu.irnod
tflSl Force Catt-oory D items be completed by flOO.TOl Further
delays. In eva 1 not ion nay tOiult in Inability to meet
deadline
KAV.O A Yankeo Atomic EH'ctrit Co 80/07/ai App
Inspection report-si IE BuSlDtini >< torrCBponileiit
3007030101 roruiardB IE Irfo NDtltc HO-'V*. "Drea hdniiin« In Contflmina 1 1 on
Control Programs- " No written response required
OR I Eft ,D H Region 1< Pli ilad slphia, Office of Us Diroctar
BQ/05JSB lp
8007010539 Foruaids 3C Info Net ICE HO-3), "Lost> Qt Suction to Emnrgdncy
Fee-duater Pumps " No wri ttcti i eaponee required
SfllER,]] H Ronioir 1. Ph 1 1 ad a 1 phi a. Office of tho nirector
HO/OB/29 lp
DOCKETED STEMS
00/117007' Submit* reply tu IE Bulletin £30-12 re decay. Heat rcrnovaJ
onepflbility Plant prci edures uure analijied for adequacy of
safeguards d<jcj>ntt IH-.B of redundancy !. divei^ity of decay
heat removal sij-s
WlNOENIKJFIQ, D E Van Hoi. Atomic Electric Co 30/06/05 4pp
007010057 Responds to 1C DullBtin fSO-05, "Vacuum Condition FlBBulting
ill Damage to Chcmital Vol Contra] 5ys ( CUCS > Ho3dup T.infca "
Tanks used for 1 ou pressure prute-ss or holdup purposes are
•iiiequattili) protected -against vac uun tonditions
MOODY, D K Vaniet* Atomic Electric Co F3O/D4i/lO 3pp
007H10A3/J Furudi its IE Info Notice BO-ZA. "Evaluation of Contractor
art Program1!! " Na written r-esF-anee required
GRIER,n H Region I, Ph i Isd elph I a. Office of the Director
BO/06/10 Ip
OO7160H/0 Forwards IE Info Notice 30-37, "Degradation at Reactor
Coolant Pump Stuoa " No specific action or response
rnqu 1 red
Q[IIEn,0 H lleylan 1. P hilad&luh i a. Office of the Director
EKJ/Q6/1L Ip
Ft Periodic operating vuports I. related curroapondonco
OOO721O39'? Forwards "Effluent t. Waste Biftpo&nl Semiannual Rept, Jan-Juno
1179 "
OUDCE.ft H Yankee Atomic Eluctric Co 7?/OB/2<f Ip
— 000721O4G3 "Effluent a Haste Disposal Semiannual Rept. Jan-Juno 1779 "
» Vanliuo Atomic Electric Co 79/OB/2') llpp
B fieport.iblo occurrences- LERo & related correspondence
80070/0254 HO 00-12 during liquid penetrant eiaminati olio of piping, two
linear indications uoi H Pound on weld <isi>d to join valve to
schedule 1O coupling ValvB will be removed fc examined
AUTIO.H /> Yankee Atomic Elactric Co BO/06/SV Ip
DOCKET 30-17 ARMV MATERIALS RESEARCH REflCTDH
Q In-apectlon reports, IL Dulletlne d correspondance
007^17(1116 Faruards rB5ponsc to- IE Bulletin 00-06, "Engineered Safety
Featurv <EEF> Reset Conti-ols " Circuit mnda ulll bo made
to proclude auttmatlc i-uaet af aaf sty-rclated equipment from
ftfnBroonci) mortu ds result af resetting ESF niflnal
VONDENDUROH, J> E Vankee Afcnimc Eloctrit Co SO/Oft/U 3ff
800/160833 ForuJdrita 1C Circular EIO-14i "Radioactive Contaminotion of
Plant Dominaral i red Uator Sy « fc Resultant Internal
Contaminot i on of PerBonnnl " Ma urttton rctponEO required
ORIEfl, a M Region 1. Philadelphia, Office of tho Director
QO/OA/2') Ip
0070^070(1 ForuardB IE Pullotin BO-IS. "PonsiLle Lose of Emorjencu
Nottf ic.ition Sijt, (ENS) M/Loss of DfFalte Pnuer '• Written
r a opens i* rcqui reil
GHEI-lt,B II fteijion 1, Philadelphia, Office of t)m DJmctDT
30/06 /It) Ip
BQ07ai015» Foriuardi IE Infu Notice BO-24, "Lou Level fiaduaato Burial
Criteria " Ho iuritt«n rCBponsu required
QRlEn.B M HOD i an 1, Philadelphia, Office of the Director
00/06/25 Ip
0<m70riBL' Reupunds to IE Bulletin 00-09. "Hijdramotor Actuator
J)iff»i;mticio3 " No ITT OcnefHl Controls AH-90 DT NH-90 Series
hydramutor oc tufitori, useil in saFety-r-Bla ted si) a
MQQDV. D E YankoB fttomic Clecti-lt Ca eO/Ot/10 Ic
OO71£]OI4'1 roTuardS replij ta IE Qu!]*tln 79-27 TV loss of n(Jfl-Clo>ii IE
t natrumur>tacion >.< control power Performo-d reviem l>
ovaluatioTi of pouier supplies uhich could affect ability to
achlevi) cnlri ihutdoun
MOODV- D E ratiloe Atomic Electric Co BO/06/18 19pp
Forwards IE Circular 90-15, "Loss of Header Coolant Pump
Coaling i. Ndtur.-il CirLulation CouSdoun " No writ ton response
requireil
II fie g ion I, Philadelphia. nPFicv of the Director
Ip
007160753 Forwards IE Circulai 00-11. "Rad I oactlv* Contnnn nat i on of
Plant Domineral ueil Water Sya I< Resultant Internal
Contamination up Personnel " No written response required
Region 1> Phi I iidel ph ta. Office of tho Director
Ip
307HIOB91 rnruinrdB 1C [nfo Notice 00-34, "Lou Levol Raduatto DuriHl
CTiteria " No written re-sponue raijiilTed
(Jfiien,!) H Hflflion I, PhiladBlphia, Office c-P the Dirottin'
!p
007aiOBOk InformK of aPPirmatlve Pinilitios in rusponiB to IE BullutJn
00-OB re exlstan^s1 nf Plueil Mead designuil p enotrntl on
c n-nnec t iuns AdJl stem* concerning penetration asiemblles
fllao distusmd
HOODV.D E Yankee Atomic Elactric Co GO/flb/Sa Ip
}073301B9 Popular J s IE Quiilntln BO-I6, -"Potontial MHap.plUal.ton at
noB-emount Inc «udc] a 1151 it tlflE Precsura Transmi t tart
M/Elther A or U Output Co riot " Written raBpcnflf renutrnJ
11T Circular dO-lb also end No written rffsponsti required
DRIER. D H H«gion 1. PhUjmolpliia, Offico of the Diroctor
eO/06/27 Hpp
107210002 Mvttet that IE Bulletin 77-17 reporting requlnunintfi far
LCfT 00- 1H re linear iiKSicatinns ore no lunger applicable
Intarnul Jtnunl pvrivliant e t. ami not ions if tntcrnnl «urdicei
confirm no through-u/al 1 def et ta
AUTIQ.H A Yankee Atnmlc £)&ftrlc Co BO/07 /OH Ip
007330273 Submits repl-y to IF null i> tin 30-10 ru cuntamln*t)uii of
nar.radicac.Live tifi & potential for relDaie Preieitt sampling
frequency mill pi-nmptly identify any contamination
IMOODV.D F Vankthu Atomic Electric Co 60/07/07 Spp
007330276 Submit*, rcplu to IE bulletin 80-11 rei tnotonrij wall iteiign Ho
further ju»tif icatinn for u*e op cqdpi as Satis of re-
evalufltlan crit-eria in requjrod
HEIDSR.L H Vanfcte Atonic Electric Ca 80/OV/Ofi f,pp
so-so UNION cf\nnii)E REBCAHCH
F Socuritg, medical, emor-goncy t< firs protection plann
B007a3COBI Ftciiuestft rconlutlon of nutfitand ing Pen iusuou for cartalti
phijs-iis.1 ace uri ty-relatod documents !< emergency pi an a Memo
dtd 7'/Oflt-1 ro 790220 ouard training pUn submitted by OA Co
navsr aneuered
MILLEn,U 0 License Fen Nona g OBIBII t Branch QO/O7/1& 2pp
0 Inspection rspui tu. IE Dirl loti na It con u op-ondence
ForuardB IF Circular flO-Hi "Rjid i oacti ve I'Diitominotion of
Plant Dcmlneral i i od Wator By 5 !- rtesultant Internal
Cnntanii nut i un u f Personnel " Nil uirlttan response required
DRIEn.D H Reolon 1. Phi laJelphifl, QFfico of the Di ret tor
BO/06/B4 Ip
H007ai011/ FtiTiuari»s IE Info Nutica CO-21, "Lou Lovel [(adujaute Durial
Criteria " Mo unrittcn rusponoa ro-quirBd
OR I ER. B H Rogiotl \, Philadelphlo, Office Uf the Director
Ip
0007300030 Ack receipt of BOO^HO Itr In reeponae tn NRC Q00407
noticu of viulntion ti notice o P propuned imponition of civil
penalties AJno for wards nrdcr Imjiosing civil manetai'y
pena 1 tg
STCLLC1.V NRC noflional Offices BO/07/11 2pp
— D0073O0040 Order imposing civil rnunntarij penalty re noncompliance
noted in IE Insp uf fntilitij on 80010B-29 flpp A, avnluatiun
JH conclustnn oncl
! V NIIC, flo.jional OfPicBa CO/O7/11 Spp
B FlBjmrtnb lo octurrencesi LCRo fe reliitert ciirreapondDnce
G007H3ni4Q JsN-fJO-fUHA on 800711; order imposinfl civil penalty of *tiOOO
wai issued Aftel c onni dera tion of licensee response. IE
concludvil thot one itom of noncompliance did occur
BnDCHCTT.T H , THOMPSON, D nffice of Inspection !c EnPorCHm»nt.
OPflcv of t/io Director eiO/07/ll Ip
DOCKET SO-57 BTrtTE UWIV 0^ NEW YORK RESbAUCH REACTOR
0, Inspection rt ports- IE Dullotins !i correspondence
0007160627 Forwards 1 IT Circular 00-11, "Uadioactivo Contamination of
f'lant »»mlnural 1 (od Uatur Bua (< Resultant Internal
Contaminnt t on of Personnel " No ujritten rB-spnnte roquirad
OniER.D II Flea ion i- Phi IniJolphiQ, Office of the Director
BO/06/24 Ip
19
B00721Q140 roruarrls IE Info Notice 30-21, "t.ou Level Rudwasto Burial
Criteria " No written response required
QRIER.B H Region 1, Philadelphia. Office of tho Director
BQ/Oi/25 IP
R Periodic operating reports t, related c orresponflenc D
B0072B0654 Annual lept of changes, test's !i eipci iments fur Jul 1979-
June 19RO
ORLOSKY.!1 M Nfli" Vork, State Univ of. Buffalo BO/07/22 Ip
80072906174 Provides rent foi Jul t'i/l-Juno 19BO 5e changes eipenments
!c tests conducted u/n prior NR< approval per License Fl-77
Nona conducted
, P M New Vork. Stdte Unlv uf. Buffalo BO/07/SS Ip
DOCKET 50-59 TEXAS rtt.fl UNIV REBEAflCH RCACTOR
R PHrlodlc opor.itlng reports It i elated c orrospondenc i
00Q7210S0.2 Furiuardu "Annual Operations Ropt of TX A!.M Unlv ,AQN-2Olrt
Training Reactor," for June 1979-Miiy 17BO
CQCHRAN.R 0 TO'ds A & M Unlv 80/07/11 Ip
— Q007210313 "Annual Operations Rept, of TX A!.M Univ AGN-2Q1M framing
Hoactur. " for June 1979-May 19BO
ZGHCZYNBKI, J D, CBCHRAM. R 0 Te<as A & M Univ 00/O7/H 9pp
0007310030 Forwards "Annual Operations flept of TX A!,M Univ AWJ-201M
Training Roacfcui i " June 1979-Mag 1<?BO
COCHRAN.fi Q Texas A tt M Univ (30/07/11 In
DOCKET 30-6J UNIV CIF VIHOINIA HtSCrtRCH BCftCTOfl
r Bacuritiji tnedirol. omer(|cncij (( fire prntection plans
4^9 FnruarriK phgolcal aecurltg pllin Ci propound crhangus to Tech
Specs Plnn uiithhold (ruP lOCfRH 790)
SHHIVER. B L virfjinifl. Untv of I30/0//1D 2pp
— H0072I0133 Tecli SpeCB 3 3.^ 1,4 J.I 0.6 P & 6 J ro BafHty limits.
limiting cnndltinns far operation !< iiirvvl 1 louts
rxjuiremonts
it VTlrglnidi Univ of BO/07/1!) 9pp
0 Inspmltion reports, IE DullBtinn t corraopondencn
P Operating license stage dof umt'nts h corresponderce
B0071fcO360 Aflvisob that landslide investigation progt am began on 600633
i final ropt mill ce submitted to NIK between BOUBl'i-29
Manitoring program not intondBi) tu provide data for
evjlufftion before issuanre of landslide Stability SER EUppl
DAFIMITZEL, (1 U Gnneral Eleitiic Cfl HO/07/07 2ff
Advise', of NBC reorgani J Jt ion on OOO4JB mhich reaultoU In
nuiiber of changes in ofc ti tl es. p OB i ti ens fi ai.Eignment5 of
personnel Also submit! info for StTR
Na^AK.T M Assistant Director fur tlperdtiiig Reactors 90/07 /OB
Epp
H00722034'i Foruards re-spouse to NRC BQ0610 request for info
demons t rat ing ability of OETf) In mict loadings associated in/
doGign basiss specified in NfiC BOO-523 safety evaluation Sn
consultant repts ent 1
DA(!HIT2EU.R U General Eluctric Co BO/07/17 3pp
— B00722O353 "Structural Seismic Invettigatlona of GiiTR, " summary rejt
« Engineering Decision Analysis Company. Inc BDAC-1 J7-39B G3
QO/07/OQ 41pp
— 8007330356 "Add! Investigations to Determine Effects of Vibratory
notions Due tu Earthquake on CaUvoras Fault." Revision 1
« Engineering Decision Analysts Company. Inc EDAC-1 17-3S3 OS R 1
90/06/30 llpp
— B007a303i.2 "E»pantfpd DeBcription of aol! PresDurc AnalyBEE." Suppl 1
tn "rtddl Inveatiga tions to Delnrminu effects of Combined
Vibratory Motionii ti Surface Ilupture Offset Due to Earthquake
on Pustulated Wrona Fault." Revision 1
* Engineering Decision Anfllgslo Company. Inc EDAC-117-253 01 F!l
fi 80/O6/27 2-lpp
— SO 07 2 203 Hi 6 "Evaluations for 0 t> Oravitij tirounfl AKC eleration Case, "
Gup pi 2 to "Addl lnvestig.it lot's to Determine Cffects of
Combined Vibratory Motions tt Surface Rupture Offset DUB to
Earthquake on Postulated Veronu Fault. " Revision 1
* Engineering Decision Analysis Company, Inc EDAC-U7~J33 01 Rl
6 OO/06/30 15pp
— 8007220369 "Review of Seismic Adequacy of Pip ins fc erjinpniBnt, OETR "
* Engineering Dacinion Analu*ia Companij. Inc EDAC-117-H99 01
™-B0073£Oa7fi "Combined Parameter Prnbafi i I itij Analysi s. OETH »
t Jack R Denjamin & AssDCiates, Inc 111-017-02 BO/07/1H
Q007170173 Forwards IE Circular flO-14, "flod IO<IL ti ve Contnmi nati on of
Plant Uomlnaroliiecl Wator Qys Ik Resultant Internal
Contamination of Peruonnut " No written retpwnso roquirod
O'dEILLY. J P Roglon 2. Atlanta, Office of the Director BO/06/S4
tp
DOCKET 30-67 HCMASTEfl UNIV flEECAFICH REACTOR
R. Psrtodlc oporntinfl reports t, iBlntud corioapundoni.u
0007020370 Huapondi to NRC 000102 raquoiit for plant parannnol o-jpiisure
ti monlLorinp rcpt
MAXWELL- L U Army.Rept nf BO/05/11 Ip
— B007020375 Forwards 1979 personnel expoBorn li monitoring rept
MAXHELU,L V ArmijiDept of 00/03/19 Ip
n007290007 Kutlficalion of 800730 meeting w/OE in Betheada, MD for
licenses presentation of addl OETR structural evaluations
NEUSON.C C Licensing Branch 3 BO/07/S3 3pp
fl0072H0377 Toriuards memo deecnbinfl slope monitoring program initiated
in Apr 1900 Monitoring nys deaionfj to detect ground
movements of several Inches or more uihich might accompany
reactivation of landslide complei Affidavit end
OILL1LAND.D L General Electric Co 00/07/35 7pp
3007^80637 Uiscuuses litndElide stability investigation Field
tuplorfltion pliai.0 complete Hummary rept end to verify that
field work performed uill provide tatu factory ^ample& to
deturmiiH) adjacent hill stability uniier present conditions
QILUL.AND. D 1- General Electric Co EtO/07/23 flpp
Inipectlai) leporti. IE BulloClns t<
— B007O203B2 Rept of rorovdint persannol whole uody eiposurea for l"?79
» Army.Dapt uf 80/03/1V Ip
DOCKET 30-70 GCWERAL ELECTRIC TEE.T REACTOR
Q AdjudHatnry corroaponflence
B0070H046B ForuurdB May 1980 snPety evaluation re OETR
BWANBDNi D T Hoflring Draltth 1 nO/Oi/37 IP
0 Advisory CommitUo on Haac tor BafegirardB reports !. corraBpondent e
B0071BOi09 Commenl!* on QETR dnta NRC (' USOS bflvn prepared ntudle*
mhlch favor ttiuttinfl down facility Mont dangarous condttion
la assumed as being In existence, but no 4tepB have been
taken to correct condition
PHILBRICK.BB Phlltbctck. SB HO/06/07 Ip
Q007iat>r3O& Foruiardi IE Circulai 80-14. "Radioactive contnmi-natian
Plant Domlnflpaliied Water 'iys fc Resultant Internal
Contamination (if Personnel " No written roaponfie required
ENGEi-KEM,R H Region 5, Gfln Frnncisto, tlffice of the Director
SO/06/2 4 ip
DOCKET 50-73 GENERAL ELECTRIC NUaCAl! TCBT REACTOR
(1 Inspection reports, IE Bulletin* & carrtEpondenie
Forwards IE Insp Rept 50-O73/f30-nH on 800421-22 No
noniomp 1 lance notsiJ
CREWS. J L Rsfjlun 5, San Franrifico. Roactnr Ofierations Nuclear
Support Branch ao/Odfi/04 2pp
DOCKETED ITEMS
1C lii£|i Kept 'iO-O.n/BO-0
f uric ti mi
procedur
O04J1-S3 No noncomp 1 ianc o
tu* inspected lop-, r ocord s, rev i tu, aud it
.-itur requalifiraticn training, tac 1 1 J t(j
viM 1 lance >, 1 1 pel inents
Region b, Gjn FranciBco, Office at the Director
ft eg mi, 5, B,in Fi .me i 9t o- Reac tor Operat 1 ons
uppurt liranch 80/O*>/03 6pp
IOO7la01Cb F-oruiflrils 1C Circular BQ-lfl, "JJiid i cac tivp Contamination of
I'lnnt Dflmiiiuralirefl Water Sijn & Resultant Internal
ContJniiiiritimi of Persimnul " Nu uritte-n response required
CNGElHfNitt It Region 5, B,.n Francisco, Office of the Director
Ip
11CKET 90-7; rATHOLIC UMIV OF ftMCFIICA IJE5EAFJCH RLflCTOFl
Inspection reports. IE UullPtins ?i mi i asp ondenc*
0071&O/13 rorwriids IE •Circular BO-14. "Jiod loac t we fontomi nati
Plfl-nt Deminerjil i ii-d Water Su*- !• Resultrint Internal
Contamination I) f F'prsotinel " No written response required
OFIII If, D H ttajjion 1. Philadelphia, flffice of tlia Director
ilO/Od/,31 Ip
JO731012& rnruiflrris In I-pfo Notice tJQ-3t, "Uou leval Rflrtuasttf Hu
Critei la " Mo written rifopoiiae inquired
OniEfl, D II HogUn 1, PJi 1 laj B 1 phia. OPfi
00/06/21 Ip
of the Directo
)C«n HQ-H3 UMIV OF FLORIDA TIIAIN^O HEACTD.R
EnepDction rffpurta, IE BulletiriD J. L orrospcindDnc 0
•)07I7OH.6 Toruflpda IE Circular QO-l4j "Rail 1 "active Contantna 1 1 on of
Plant Oprnint'ral ui'd Water Gys i ficsultunt IntHrnal
Cnntnniitmtiiin nf Pnrftnnnul " No uiritlen rd.panso retiuiredl
O'REllUY.J f Raijion H. Atlanta, Office of thi! Director OO/Oii/24
1CKCT 50-117 HLbJ INIttlUJSE ffllTICrtL eXPHI 1MLNT
Inapcitlnn ie|)iirtt, IE Hulletins ti cjirrDBpo
i072H»4St FoTUdrJa Jt Insp IlBpt 50-007/OO-Qrt on flGOMO-lt
none amp ) I alien no tori
DjWIfi, A n Heutun 'J, Cliltdga> Furl TBC 1 1 1 tij t. Materials
livanth aO/OA/83 2pp
Imp Rept 50-W17/BO-01 an B0061O-11 ND nonmmpl Innc e
notoil Major <ireiia inspDitcd omerflBncy planning IneludlnH
tratnii>Di dri I 1 &, alnrms !i evacuation nracadiires
OFtEPJ.fl J , t'HSIQ, T H Fluotpn ;i. U-hitanO' Office of tliE Dlroctor
DOCKET 50-97 C-D-RMEtL UNIV ZERO POWER REACTOR
0 Inspection reporU. IE Bulletins fc c orrospondenc e
80071(^0003 ForuarBs IE Circular- ao-lfl. "Had i oac tive Contamination of
Plant DcmlnDral i led Water Bijs ti flcsultant Internal
Contamination of Personnel " Nu written responiH roqulrtd
GfllEn.B H Region I. Pit i lad el ph i a. Office of the Director
HO/06/2-1 Ip
B00721015S Formards IE Info Notice BO-21, "Lou Level Raduaste Burial
Criteria " No uritton reiponso roq.inred
ORIEFI.D H Heoion I, Philadelphia' DFPice of the Director
Ip
DOCKET SO-99 DrtBCOCH ft WILCOX TEST REACTOR
Q Inspuc tioai reports. IE Bulletins d correspondence
0007170137 Foruards IE Circular aO-14i "flad i o-ac tl VB Contaminjition of
Plant Ppmineral 1 1 ed Water Sija fc Resultant Internal
Contamination of Persannul " Ha written roEponse required
O'rtEILUY, J P fleuion 3. Atlanta, OFFlcc of the Director BO/Oi/B4
DDCHr.T 50-106 OHEODW ST/lTE UNIV
Q Inipestion rupnrti> IE Bulletins t corroHp ondence
BQ0724036 1 Foruiardo IE Insp Hepls 30-1 D&/80-O2, 5O-243/00-03 t,
70-097J/aO-OJ an [100630-0701 No none amp 1 lance noted Cncls
yithholil (ref lOCFffS 79O)
NORDERHAUO, L tt liogioai 5, Ban Franclaco-, Bafeguards Dranch
BO/07/11 Sfp
0007150559 Forwards 'Tinal Dec omrni ssi onlng Rept. OR Gtata Univ AOM-201
R<9dctar>Lt cense H-^l " Boacribes changes to physical
security plan required in i on junction ui/decammis*! aning
WrtNO. C H Orenon fitato Univ UO/07/1O 3pp
— - B0071505H.2 "Final Deccimmi SB i onlng* Rept.DR State Univ AON -2 01 Reactor
L ICBIISB R-31 "
" Oregon State Un-tv QO/O7/O7 lOpp
DDCKET 50-111 MOUTH CAKOUINA B FATE UNIV RESCAHCH HEACTOR
Q Inspvctiun roportE> IE Bulletins t< c nrreipundence
B007170161 Forwards IE Circular DO-14, "Radioactive Contamination of
Plant Demdiu-pal i i ud (Jater bys r< Resultant Internal
Contamination of PerBuntiol " No written response required
O'HEILl.V-J r nuginri 2, Atlanta, Office of the Diroctor, 80/06/31
0'J(7fti,iib Fonj.irds It Circular BO -Hi "llnd 1 oac t i vo Contomtna ti on of
Plant Don t n trrn 1 1 1 IM! M.itcr ihja (• RotLiltaiit Interim!
Cantaminat inn "f Personnel " Nn mrltton rcsponBc required
KEPI'LtH.J 0 Hegicn 3, Chicjgap Uffiru of the Diroctor BQ/QL/St
IP
DOCKET 30-1 12 UNIV OF UHLAHDMrt RESEARCH REACTOR
Q Inspection reports. IE Dulletinn !< corre jponilenco
CHUT D()-B=? CCNURAU ATflMIC CO
Security, mi>t ita 1 • emeig&ncij it fitc firotrctiuri plans
07230091 Hoqucfitii I vr>i>lu 1 1 on of QutRtond Ing fee itauos for certain
physical sci ur I tij-r t-latuii documents !t I'meraenc i) pljina Momcf
dtd 770VIO rs WQ33Q gunrd training plan onomitted by GA Co
novor anHuiured
M1LLEIMJ D 1.K.BH5L* I'oc NanagBmont Branch PO/07/1A 3pp
8007180^52 foTtaariis ic Circular 00-14, "Radioactive Contamination of
Plant Demi norali i Ed W^tsr Byt (< Resultant Intornal
Con tflmio.it Ion of PerBonnel " Ha turitten. rBsnonse required
tNGCLHEM.n H RBginn S. flan Ti-anc i aco, Officu of the Director
Ip
DOCKCT HO-1I6 IGWA HTAtr UNIV RUSErtRCH REACTOR
0 Inspection repurtsi IE1 Dulletlns A correspondence
Inspection repoltSi IE Dullotitla
071G0271 Foriuards Jfc Cirrular BO-l*, "Rad lour live Coiitamina t i on oP
"lant Demlinn-nl i ititi Watar Bgi & flosiilttint Into-rnul
rontomi nation erf Pursunnel " Nn utltten r&ipnrnc required
ENQELUt'N. R H Hoflion 9, Eidn F-rflntitcd. Office of the Director
30/0(1/24 ip
B007I7Q£>2¥ Foriuflrd& IE Circular (3O-14, "RadioactivB Contamination of
Plant Uomlnoral i led Hater Sys ?< Roiultant Internal
Contaniiriat ion of Personniel " No written response required
KEPPLCIt, J Q Region 3. Chjcagn, Office of the Director BO/OA/B4
DOCKET 30-123 UNIV OF MISSOURI RESEARCH REACTOR
0 Inspcttlon roports. IE Bui 3 e-tdia d correspdndif
000717064A roruinrifs IE Cirtular HO-lti "Rad ioactivP Contamination of
Plant DominBT-ali lod Water BUI & ftoeultatit Internal
Contamination of Perionnel " Mo written i-esponi» renuired
G Region 3, Chicago. Office of the Director 80/06/24
DOCKETED ITEMS
21
S0072S0122 Ack ruceipt of IE (.ircular 00-14 t. distribution to
demlneral 1 led mater sus staff
PLANJE, T J Missouri. Univ of, Roll a 80/O6/30 Ip
BOO70104At? Responds to 800507 Hr re aOdl TMJ-2 requirements SchBduli
for meeting requirements mill bo proposed following
resolution of seismic Issues
CRANE. P A Pacific Gas & Electric Co 90/06/26 ip
DOCKET 50-121 VIRGINIA POLYTECH INBT TRAINING REACTOR
P Operating license stage documents (c Correspond (?nce
aOO?330f?B Forwards proposed Tech Specs l< opurator renual i f i catum
program for reaoorch reactor per License H-b3
CUHTNER.A P Virginia Tech BO/0//1R 3pp
Inspection reports, IE Bulletins !t c orrcspondence
B0072506&B Heapc-nos to IE Bulletin 7?-Oin. "Environ Qualification
of Class [E Equipment " Schedule For submittal of info uill
be proposed uihen coiismic isoues currently unttor study have
been resolved
CRANE. P A Pacific Gas & Electric Co 90/03/03 Ip
— BQ072303D3 Proposed Tech Spnce, App A, re aafotg limits I, limiting cafotu
Bija settings. 1 imi ling conditions For oporati on, survei 1 lance
requirements, desi gn features Si administrative controls
* Virginia Tuch BQ/O7/10 33pp
0 Inspection reports, IE Bulletins tt correspondence
C0071701fll Forwards IE Circular BO-lfl, "Radioactive Contamination of
Plant Domineral 1 led Hater Sya !< Resultant Internal
Contamination oF Personnel " No uillten reBponso required
O'REILLViJ P (legion 2, Atlanta, Office of the Director 00/06/24
Ip
BOO723066B Responds to IE Bulletin BO-03 lltil does not use charcoal
tray adsorber eel Is
CRANE, P A Pacific Gas t, Electric Cn 00/03/31 Ip
0OO7230OJ6 Forwards response to IE Bulletin BQ-02 Feoduater spargers !.
thermal Blocves mPfl by Marvin Engineering Co are not U6*d in
facility
CRANE, P A Pacific Gas fc Electric Co BO/04/23 3pp
B007lflO&a4 Forwards IE Dulletin DO-13,, "Cracling in Core Spray
Spargers " Written response required
ENOEUKeN.f? E Henion 5, San Francisco, Office oF tfi e Director
BO/OS/12 Ip
DOCKET so-iaa TEXAS A!<M UNIV RESEARCH HEACTOR
B Pariodic operatinfl reports & related corruspondBnc i
0007H9046B Forwards OHO-'»a07-l3, "Suteenth Progress fiopt of TX A!.M
Univ Nuclear Science Ctr, " 1979
RANDALL, J D Teiafi A t, M Univ BO/07/3S Ip
— 80Q7H9Q473 "Sinteenth ProgrBSfi fiept uf TX AfcM Umv, Nuc loar Bcicnca
Ctr," 1979
DATE8.E F . rELTt.D E . TAfT. J P Tolas A (< M Univ aRO-fl3O7-13
BO/06/30 BOpp
DOCKET 80-1H9 WEST VIRGINIA UNIV REbUAUCH firACTO/1
0 Inspection reporto, IE Hulletins t< correnponileiico
B007170103 Forwards TE Circular BO-M, "Rndioactivo Contamins tloii of
Plant Domlnoral 1 md Mater !Sgs (. Resultant Intern'il
Contamination oF Peraannel " No uiritton renponsff required
O'REILLY, JP Roglon S, Atlanta, DFPlc.0 of the Director BO/O6/31
DOCKET 30-133 HUMHULDT BAY POUGfl PLANT, UNIT 3
O Ad jud icatoru correspondence
3007310243 Forwards CommluBion BOOSa? mamorandum !< order contolnlng
decisions on UCS 7B03O2 petition For rut one iteration of
780113 memorandiim tt order UCS 7711O4 petition sought aution
re fire protection for electrical cabins
EISENHUT.D 0 Division of l.tconalng aO/Oii/21 89pp
6007300340 Roneum QD0606 request for all repls preportd by TERA Carp
Related correspondence
BHOWN.L J Jones- Hroun t< Clifford PO/07/03 2pp
0007020212 Foriuards IE Info Notice BQ-2S. "Broakdouins In Contamination
Control Programs " No. ujritten response required
ENGELheNiR M Rogton 5, San Francisco, DfCire of the Director
BO/05/2O Ip
0007230337 Foiuards IE Info Notice BO-?6, "Evaluation of Contractor
OA Progrjms " No written reaponao requirod
ENOELHEW, R H Region S, Ban Francisco, CIFfico of the Director
00/06/10 Ip
9007140413 Foruflrils IE Bulletin BO-H, "Degradation of DUU Scram
Discnargif Vol Capability " Written response renuired
ENOELKEN, R H Region 3, San Francisco, Office of the Director
QD/06/1K Jp
1300717000-1 Forwards 1C Insp fiept 50-I33/HO-O2 on B00530-22 Wo
n tine amp llance noted
CREWS, J L Regian 3, San rranciaco. Reactor Operations Nuclear
Support, Branch 90/06/13 3pp
— a00717QOHB IE Insji Rapt 30 -133/80-02 on BOD520-.J3 Nu noncomp] lance
noted Major areas inspected operatl ont. organl lati on &
adminio tration. fo! Iciuiup on IE bulletins ti circulars t.
independent insp
TARLGON.J D , MQHRILL.P J Region S, San Francisco, Office of the
Director STERNDCRB, D Region 3. 3an Francisco, fteactor
Operation.! NucBear Support Branch QO/Oft/10 4pp
E300702047fl Forwards 1C Circular BO-IS, "Lpaa of Reactor Coolant i'ump
Caolinjj t( Natural Circulation Cooldouin " No written reapo-nse
Toquiro-d
ENaELUCW, R H Region 5, San Francisco, Df f i c ti of the Director
BO/O6/20 Ip
00071130387 Toruaroa. 1C Circular 00-14. "Rad luartl ve Ccintamina Lion of
Plant EH'mtnerdliiei) Hatnr fiyt !i Resultant Internal
Contamination »f Personnel " No written response renuired
ENOELKCfl, R H Region S. San Francisco, Office of tlie Dirctbor
OO/06/24 Ip
00071B03SB Foruiarda Hooduard-Clydo Conoultants 000701 Itr outlining
status of DDDlogic (i Reinmlc investigations re facility b
statui of work acLomplished during Hoy d June. 19410 per rtSLG
790619 order Cartificoto oF 9vc oncl
FUfiDUSH, M, H , CRANE. P A , LOCKE, R r Pacific One t< Electric Co
00/07/13 6pp
3007330307 Forwards IE Bulletin fiO-16, "Potential Mi uapp 1 1 catl on oP
Roiomount Inc Mnilcls ilsi (, 1133 Pressure Transmitters
W/Eithor A or D Output Cqdnis " Hritlon response requiT eil
IE Circular BO-16 nlso encl No written response required
ENOELKEM, R H nepion 3, Ban Franc! sco. Office oF the Director
80/04/27 Ip
B0072303Q6 rtdvi.Bs that info t. repts requested in HOO&06 !. 0705 1 trs
uiere not Included in agreement fur informal discovery
reached at 000603 hearing Info will be incorporated ui/
Uooduerd-Clyde Filing to be mado by 301001
LOCKE, R F Pacific On* h Electric Co BO/07/1F1 3pp
P Operating license itJige documents & corre«pondencit
B007100049 NDtificotion of BOOS07 meetinu u/util in llceheada, MD to
Jiscuss proposed continuation It exomirm preliminnrg rosulls
of sBiemir- !< goologic investigation
ROONGY.V L Dperatina Reactorfi Branch 3 00/0-5/20 Ip
3007310461) Responds to IE Dulletin SO-1 I re masonry wall design
Heso-liit i on of problems will be perforneil fallowing
completion of geologic investigation
CftAME.P A Pacific Oas 6 Electric Co DO/O7/IO IP
R Periodic operating reports t. ivlated correspondence
QBO71BOS6B Foriujrds monthlij operating rept for June I9BO
MEEKS.E D Pacifir Dan {< Clottric Co 80/07/07 1 p
— B007150573 Monthly operating rapt for June 1 9BD
DAUN.T U Parlfll Gas t. Electric Co 80/07/03 4jip
07160320 Forid.irds 1C tliculor HO- 14. "Ffsi! 1 not 1 1 vi' Cunt-om ni)t i on or
Plant Deminerali it-it Writer Syi £. Resultant Internal
Cont.aminntiort of Personnel " No un tt en i s>sp onfia required
GUICR, B H Reuion 1. Pl.i lode Ifili is, Office op the Director
130/04/24 lp
DOCKET 50-130 OHIO STATE UNIV H EG EAR I H REACTOR
P Operating license stage Uccumonti & £ QI respondent D
BQ07030169 Advises that B001 10 revision af security plan has been
oppi aved FaruiarJs Amend f to L.icen&p R-75 id uriti fij ing
ciiTrentlij approved security plan
MILLER, J [! Etandflrdliatioii tt Special Prujoits Branch BO/06/16
3pp
O7210144 Fni-njarUe IE Into Notice BO-24, "Lou LE,eJ Radicate Dur-ial
Criteria " Kn written re£pon«.i? required
GF11ER. S H Region 1. Phi lado-lph i a. Office of the Dippctur
BO/04/25 Ip
— SOO/O^OI'/fl Amend 9 to License tl- 75 identlfylnn currimtly approved
phy.cicpdl security plan
MILLER, J H Standardization ti Special Projects Branch GO/Oi/tfi
CKET 3O-I35 WrtLTfiN HEED RE.SCARCH fiEnCTO/t
Operating licwnae stdgn documents t( c CIT rospo-napiir
O7IOQ3?9 Ri'i|iond5 to B00239 1 tl which nipresaea oppoaitioti to ACI1B
rucommondat ion to rt s true ti)T o SEP linle of liet-naene in
prograiu will papand k.tr Poruarded tn Cnmmi a s i oners
1)EHTDN,H R Office of Huclear Reactor Rpgu la tidm Diroctor
BO/06/IE) Ipp
0- Inapoct-ion reports, IE Uullutins & f 01 r eapondunc &
e007]7OdJ4 Foriuardo 1-E Circular SO-lIp "Radioactive- Contaminatlan of
Plant Demirtera 1 1 led Hater 6<j n ti Resultant Internet
Contaminfl tmri of Porionnet " No untten reapDnae required
KEPPLtBi >J 0 ftiiBion 3' Chicago. Office of the Dlroctnr SO/dfi/EI
IP
8 fJoportabJe nci urrunc on. LERa 6 rfflate-U c orre spondDncB
a0071OOa2D etpreaies opp-nBition to nrfiS recnmmend.itl on to restr uf-burc
SEP For SEP cunerE to perform *af&tij analijais tie outlined,
cost in -dollara & manpower uould increasu dramatically
ECHAfFSTrtLL, (! StP Ounnrs Grnup BO /OS /SI 2pp
B00701O1Q1 Informg that ruporbable name omp 1 i anc a itom Biiats involving
Toch Qpoc rJ 1 Air conditioner For inul tichonne 1 atvalyjer room
not tied to Hmernontij auitch In control roDm Action
Initiator to have air cunditianeT bied tn control room
llEDMntJD.tl F tllilo State Univ BO/'O(b/17 2pp
CBET 90-139 UMIV OF WASHINGTON HFStftRCH REACTDII
Inapection i-eports. IE Bulletins !< rorrciipondB'ic
9 Koruarda IE Cii-LUlar 80-14. "Hat loac t i VE Con tnmination of
Plant DEmin&raliled Uater SM B 6 E?B5.iiltant Ititupnnl
Cortaininat ion of Persnnnel " No uii i Ltun roBponi-B roquirod
ENGELrtEN. R H Region 5, Oan FraticiBco, ClFPlct of tfin Director
80/06/24 Ip
07310523 Forwards IF! 1 nip Rppt -iO- 13WBO-03 on flOOC, 1 1 No
Tjoncofnpl la-nce nnti-d End withheld (ref 10CFH2 790)
NDflDERHrtUe. L R Rogion a, -^an Fratiii=ico, Safeguards Brant h
30/07/22 apfi
DOCKET SO-191 WHIV DF ILLINOIS RESEARCH HEACTDR
(1 Inopocttnri rcpnrtti^ IE Bulletins I' t orre spond ant a
G007I70A14 Foriuurdi It Circular BQ-14, "Had i oai tj. vo Contamination of
Plant Daminoral i rail Milter Sij s S Resultant Internal
Cnntamlriati un of Pergonnul " Ho Lj-rlittai) responsn required
KEPPLEfl, J 0 Floginn 3, Chitago. Office op th» Director 8O/Ofi/S4
IP
DOCKET 30-153 FUOR 1 Dft WEST COAST NUt,t,EA!t GROUP INC
0 Inspection rep-nrtn. IE Bulletin* S< c orreEpord enc e
ICHGT 50-H3 UCLrt TRAININO RErtCTDH
Security^ nodical' emErgoncij ti fi
i071602'JO Forwards rtmond 1 tu (ihyeic..! socuritij plan for protection, of
SNN af moilei-atv strategic s i gm f itaTtre f'liin ui t hh f-ld
Cref 1QCFR2 7701
CftTTOM. I j UEflST.H rallFornia. (Jn i v of, LD9 fltijelcs HO/O7/O.T
"P
Ad jud teat cry corresp ondance
I070"?O197 RBiponse to CDmmlttuP to Bridge the (lap June 1900 petition
to intervene Petitioner relied on cane lain nnt wholly
applicable cti Instant action Alleigat tuns re aspecte arc nut
apecifiotf u/cl3Titi| d detail W/Certi Firato c,f E«c
HELHICK.C . flCIBKAAR.J) L . HELWICK. t, Californin, Univ of, LOB
rtngelos OQ/07/OT Kfpp
07S50700 Order «chudiil I rvg £!0091B pTOJiuar ITIJ conforofien in Lop
Angelas. CA Cnmmitttie to Dridge the Oap euppl tc BD09H2
petition to inter vane must bo aervtnf by BDUI3LO b Univ iif C.t\
responsn by S00*?0-a Public invited w/o limited appuarance
S Atomic Bafety and Licencing Hoard Panel aO/07/HI
Inspection reports, JE Hurllntins (i correspondent o
1071BOH61 Fopuiards lEClrculni- tlO-lfl, "Had! gac tive Cnntami riat i on of
Plant DerainBraliipd Water Sys & Rosultant Intern,,]
Contaminet ian of PersDnnel " Ho iiiritten response req.ulrod
ENGELKEN.fi H Reoion 5. Ban Pranciaco, Office of the Director
OO/Ofo/24 ip
B007170A3H roruorits IE ClrculOT BO-14, "Hod i oat ti vfi Contamination of
Plant Jlpmlnnrnl i red Water BIJ 5 *• Resultant Intat-nal
Contamination of PcraunnoL " No lurttten Titsponae required
KCPPLER.J 0 Rsgiun 3, Chttsgo. DOPice of the Director BOVQci/24
IP
BKCHIHT aO-l!)3 H10 HOCK POINT NUCLErttt PLANT
P fJecurttyj imedl-col, omern trnty & Urn protection piano
OOD7i?JOSAii roTuarda revlncd site emorgETicy plan Par final NRC approval
All roniientt'd chanpua d rev! Blons. tnc lud ing App (1. have been
ma do FfevlnDif Pallafidpa site omergcncij plan will to forwarded
ui thin uh W/a one 1
JURY, M .) ConQurfmrs Pouier Co 80/06/0? Ip
0007230170 (-oruarda rnvlsed Dmergencij platijApp M
HAftTMANi C J ConaumBTB Pnuior Co BO/06/ 1H Ip
--0007S3O479 Reviiied Dmara BIICIJ plan, App M
* ConoumBf* POUHT Co BO/Q6/OI IBp
00071700^? NotiPien tfmfc TtMA/Nnc Btaering committee, reconEiderad size
of emergmcy plflnnlng tona for water cooled reac tovo of leaa
tfian 230 HU thermal 6 orioptcd encl poaition Propoaed rule &
NUnEQ/Oii34/F£MA-HfeP-I will be mndiPisd in conformflnce
CRWTtHFIElD, & M Operating Reactors Branch S BO/06/13 3pp
00070101?:) DUuusfl** propD»&d chanso to IOCFR50 adding renuiremBnt For
firn protect ion plan at facHitiea Forwards comments on
rulo, sup pi em eut Jng c«n»ul tant common t a Questions
npprBprla-UBiumi of rule-i since rulo reopens r-osolvnd issues
HOFJ-MAN,!) P Coniumera Pouor Co BO/QA/27 Qp P
fl007H0391 Forward* BeviUon 3 to 7902HO sficuritg plan Plan withheld
Iref ICCrf!.! 790)
P Coh»unmr» F'ouur Co BO/07/OB Ip
DOCKETED ITEMS
23
80Q725Q406 Foriuarda scenario of emergency uierclse conducted on
at Dig Rock F'oint Util has agreed tu critique eierciEC it
provide action plan to identify Uef it i enc i pa t, indicate
correct ivo ac tions
AXELBON.W L Emergency Preparedness Licensing Urfliich QO/O7
9007300461 Requests that NRC Furnish I'ffs U'-J4 nnted on Page / nf W/1C
eViilujtiun of several SEP ir.sm>t re facility iZvfl-lualinn. is
dtretUy applicable to D'Nuill Content ion I1D re flight of
mllitaiy airrraft near plcint
OM-l-IJ. J Isham, Lincoln t< Dt?jJ e 80/07/34 2pp
80072203-)! Forwards adtll info re sin tobi 1 1 ty. trn i ning ti qual i f 1 1 .3 1 ion
nlann.in response to NRC B00515 & OdOfc request; Info
withheld (ref IOCFRS 79O)
HOFFMAN. D P Cnnnumei 9 Power CD BQ/Q7/1/ lp
BOQ72B037O (lesponds to 791139 request for info re evacuation time
estimates in site emergency plan evacuation clear time for
0- to lO-mile area around Palisades estimated at approi 5
hrs in summer b minter
HOFFMAN, D P Consumers Power Co 00/07/23 lp
H00731010O Notifies that i-Ptponsc s to 'Jet II interrogatories will b if
sent Hint uk
O'NEILL.J ftffilial.ion Uniniiwn aO/17/P5 lp
H Oeneral t orre spun done*
S004300355 Comments Jin nperation of priwer plant utilcili ih uithlr>
ten-mile larfius of residence Decisions re pi tint should be
based on safety t; hcaltJi of people, DC t profit of util
r Affiliation Unknown 90/01/22 lp
BOO73O0439 Forwards revised safeguards contingency plans Plans
withhold tree 10CFR2 790)
HOFFMANjD P Consumers Power Co SQ/07/24 lp
0 Adjudicator^ correspondence
SOQ&3701BI Responds to BQQtlV request for Info re M LoMisre inquiry
about amount pf nuclear maste di-Bpasod in Etotp of Ml ^pent
fue-l from four operating Ml reactors stored onsite MRC
evaluated ^t.itii', of uaB^e rag t in 1977 N/related Ffi cicerpts
DIFICKS. H J Office of the Lietutwo DlTector for Operations
10pP
QD07310Q43 Forwards CommiSBion BOQS2/ memoranijum A order containing
if BC IB ions on UC9 700 Q 02 petition for reconsideration of
780413 memorandum tt ordar DCS 771104 petition sought action
r» Piro protBCtion for oloctrlcal cables
6IBEMHUT. D 0 Division of LicDnfiinn OO/06/35. B^pp
a0071HOie-0 rtcl reroipt of RF Ncuraan BOO-1P3 Itr ro operation of plant
NRC considers safety of public aa paramount in evaluation
of 1 icensieea
CRUTCHF1ELD. D M apei-atiirg Rn«iclors lirancrt 3 GO/06^39 lp
8007100033 Forwards Christa Mavia SBconfl set pf interrogatories in
ipent fuel pool eipanition prDcoedlny W5 Jordan 00063& 1 tr to
J Oallo t> affidavits oncl Related con EBpondence
JORDAN. W S Sheldon, Harmon b Mois« OO/06/at Spji
E00714O236 desponds to 800124 Itr re |n~oponrd expanatan oP spant fuel
pool Describee NFIC review process for mods proposed bij
Ucpnsefl DOE: efforts to s-clcct site fnr spent fuel otoragc
unJeruifly
CRUTCHriEUD.D Operating ReattorB Branch D SOJQk>/2b 3ff
— BOO/100037 Second sot of interrogator i P& directed to util Requests
identification of uitnessen intended to be called re
contentions of ASL1) {100117 order t< quosticno. of ASLQ BOO327
memorandum fc ordor Related corrospondonce
JORDAN, M 8 ChrUta-Maria JORDAN, U 8 Sheldon. Harmon t Weiss
BO/O6/24 13pp
— 0007100012 intDrrogatorles directed to NRC Req.u«tts Idcntt Plention of
witnaasffa intended to be called rt contentions of rtBLG
BO0117 order l< questions of ft til- B 600337 mumorondum tt ordar
CertlFicato of Bvc Bttcl Related correspondence
JORDAN.U 8 ChrUta-Hnria JORDAN, W 6 Shelilo-n. Harmon & Weiss
BQ/Ob/Sf, 5pp
8007110536 Ach receipt of 000401 tologram submittad on bolinlP of
ConornDd Citiiens for CharlBvoit Area, rciiuest ino immediate
nhutdoum «f plant Notice of petition will be publislicil in
PR
DENTON.O H Office of Nuclear Reactor Regulation, Director
00/00/26 app
60070B025B Criticuea safety practicEs at util re containment blilg dome
5< increased storage of opcnt fuel rods
CAUDNELL.E APf 11 iatian Unknouin FTO/07/05 lp
0007310332 -Responds La Itr re concerns of 0 Coi, of Indamvr Co, about
ac curacy dp local neut£ article Fncilltu granted eie-mption
Prcm lOCFftSO -46 failure criterion r BHUirBmenls on 7faQ5?i No
other exemptions in effect Ralotcd -uriler encl
BirtCJta DfPJc* of tlie EiocutWc IHrector For OppratlDns BO'/r07/54
2pp
— BOO'310335 Homarandum t, order grantiti} facility pxemptian from
IOCDJ90 16 failure criterion r equirfrmontK Diesontlng opinion
of Cnnnit « sinner (fillniky encl
HDVt£,.J C OPfice of the Secretary of the fommmsion 76/05/Hi.
l-'PP
J Insurance f< mdemnity
™ B007110563 Notice of request for action on B0040I patitlnn filed on
beholP of Concerned Citimns for Charlevoii Area roquBating
Inmediata sliutdoun of plant For alleged failure to mnat
containment integrity roquli uments
DENTQN.H R OPfice of Nuclear Reattoi Regulation, Director
2pp
6007130053 Second let of interrogatorlei directed to W 0 'Hei 1 I Flequo&ts
identification of lnade[[uacy alleged in Contention I1E-3 re
crltfealitv anolijals PP Step Lav B00708 Itr to J O'NeUl
end
BTEPTOE, P. P Consumers Power Co 8TEPTDF. P P Isham. Lineal™ I,
JJlile BO/07/09 3pp
BOC7170534 Response to Christa-Mavia et a] BOO/.aA Interrogator-Ins
Identifies wltnnnsee Intended to be colled re Chri sta-Marlo
Contentions S t. 3 fc J O'Neill Contentions ID-5j 1 1 A, I ID, 1IE-4
tl IIFfcO M/affldovtts. bibliographies & Ccrti f i coto of Bvc
MOORE. J G Hearing Branch a BO/07/19 lOpp
--B007170333 Transcript of 800306 briufing in Hath tnston. DC re BEP
Pp 1»4B Key to topic status listinn ui/definitlonB encl
104ep
B00723061B Forwards NRC rules of di scoverij , Jfl Meets repl re Clirista
mria Contention 3 i< Board notification re spent fuel pool
nod EniBrgsncu plan available at LPDR nther TBlaled tiocudient
itnt on 79IIIB U/D encl
JONEB, D W Hearing Drouth S 00/07/33 lp
B00730O468 Dlsdusses NHC evaluation of util compliance u/certain TMJ-2
LeisonB Leariiod Tank Force requirements evaluation in
Sicbion S i b b is irrelevant to O'NoiM'B Contention IIE-4
Cl*rifle* statement to avoid controversy at hearing
OALLQ.J Isham. Lincoln t- Deale SO/07/23 Spp
B007150J179 ForiuariPs Endor sement Bl to Ml PP! tcy NF-I 1 7
FOSTER, B C Marsh ti McLennan, Inc , M ft M MurU'jr Consul tants, Inc
otv ao/07/io app
B0072BOS?? Roo.uests revision of Inilemnilg Agreement D-23 Revision
provide B mare detailed 4 efci-l I p tion a< site location !• Is
current descrip t inn maed bu uli] tn insurance poJiclB-'i
u/Muclear Mutual Ltd t< Anerlc,i>n Nuclear Insurant!1
HOFFMAN. U P Consumers Power Co BO/07/3B 3pp
Q0073 10-12-3 RcquBfits revision to Indemnity ngrenment n-23 to provide
moro detnllad description of site locai-ion .'< current
d«»cri|i tion uebd In InsurAnc* policies u/Nuclear Nut if ill
Limited li American Nuclear Insui-oncu
HOFFMAW, D P Cnnsune-rs fnuiBr Co BOy07/SH 2pp
— BOQ73KHS9 "Big t">c> Point SltD Pronortij 'mf/ey, " fiheet 3
* Consumers Pouier Co 60/07/22 lp
P Operating license stage documpnti. *- c-oi
B007030339 rtdvlit's that liccnsinq ,ic t ivitios will be c oord j nate-d dy W
Pi)til»on.as i-B6U.lt of pBorgani jation n* OFr of Nuclear
R Bettor Flegulalion Doecription of rL-organii^tiDn cue. 1
CRUTCHPIELD.D Operatino Roa< ton. Branch 5 OO/O/./OP SHnp
Forwaril* NURES-OA 1 9, "DHFf rneiluatBT Noi I If
Drive Return Line Nnjile Crocl-ing.11 for revipg J. co
CRUTCHFIELD.D Dpcrfltlng ffcnrtorn Brsncti 5
B007OIOI11 Fortiards Finel ruli- publisltFa in BOosoy Ftl amc
10CFH30 71 ID require periodic updating of F&ANt. Lmnplj
is not refuireil until completion of REr1
CRUTCHPIELDiD Operating llH^ctorn Branch 5 UO/Oh/lfl
Control Rotf
tpp
DOCKETED ITEMS
107010POO- FotuisrrfB nifii ru ut.il n*que,,t to e.pand spent fuel storag.
capacity Info iTiduilob LnlPgi i tg of slruc turn] clemt.rit'i in
event of boiliivj in ponl t (iruvition of makeup mater to pool
If cnm tji i nm«nt u .111110 1 (IB uttered
HtirFI-MN. II I' Cuii&iimers I'niuor {« H<»/06/2fl PflBpp
8O07O20DS1 Fnruiards TE InFo Hatite 00-22, "BraalidQuins In Contamination
Control Programa " No written response required
KEPPLER.J G Region 3, Chicago, DFflte of the Director BO/03/SB
IP
107OI0017 rtppIUnt lun for nmuml i« l.nenso VPH-t> to change Tech
to add nporalii] il>j („ !iur veil 1 .inrt testing re^uir oment n for
fire n<*<> tertian uqu i pmtiit
IIOrFMAM. D (' Cun^omBri I'nwor ( o 80/O&/D7 2pp
EIOO/OIO151 I'rupur.inl ihongm. to frch 'Iprrt, :l 7 H
opcr.ib I 1 1 ty ti "sin vi- 1 1 1 (inr e tuiitinq I rqui t erauii t(
protoctiun equipment
tt CnnnudiEt E fuwpT (.a fH'/O/i/,1? "ip p
f. Table 3 3-3 t ci add
for f ITS
KJ/07OP10 fiiruirjvda I e iiKinco to NIJC ttOO.VB requests for info
to caluuliitff [.oil tdiinment temp tr iireeaurp .-iftor accident &
data va proificlod I IK, A maoi i. fnprgy i'i>lcfl!ie U 1 1 on ffo-pt
XN-NF-/f3~:iJ cnntAinn most recent I.ClCrt nnalijfiit op facility
, D (' ronisnm*ro I'ouor To flO/Ofi/'IO lt|>p
O7Q3O26U KoruMi-da resfiaonit to NflC ROOiXJ/ runout is aji pi i c aai 1 1 ttj
flf cHrcerne ndtlrcDaBd in 01" BOM21 Itr re genorit (ic-at-
acc idi'Ji t opornttnu cnndltiuna at l.HKs
i 11 I1 Canr,iim(ifii fouer Cu HO/O/XOl 9pp
I nruarUit vvtiliia tloii iif fiEP lopic Vtll-1 ro eJectridal
unotra t innu of rpnrtcjr Lnnt.iinnnin t HcqiiPGlt reply uithin
10 diiyn IP nfl-hulU fnclllly dlffuM. f i urn litifiising basis
11 oirrned
"FllJTCHrilLl)r 1) J1 I1|)urnHti7 Omctnrr. nr.mch S £50^07/01 IHpp
B007O1O115 ForiUflrdE IE JnPn NoLne BO-33, "Loss of Buctinn to Emergency
Faeduater Pumps " Ho uritten. rosponsE required
XEPPLEH. J 0 Region 3- Chicago. Office of the Director BO/O3/29
BOO733013B Forwards IL Info Notice 90-26. "Evaluation of Contractor
DA Pr-ograms " No written response required
HEIPPLEFl.J 0 Region 3, Chicago. Office of the Director BO/O6/1O
IP
BOO7Q3OA76 FoTUarifs site-specific t< oenenc quefltions re OE disc
crflcfcing indications per 80O109 meeting R IE Jnfn Natica
79-37 afi We-st inghouso lou pressure turbines discs ct-ackE
FlesponE-e requested uiithin 30 dags W/o encl
CROrCHFlELD.il Operating JleattorB Branch 5 SO/06/11 3pp
B00714O317 Forwards IE Bulletin 00-11. "Degradation of QWR Scram
Discharge Uol Capobilittj " Written response requireil
HEPPLERfJ O Rngion 3. Chicaflo, Office of the Director BO/06/ia
IP
BOQ7310004 ForuiaTd's IE Iran Re-pt 50-J S-J/BO-04 on 800303-14 t, notice at
violBtion re hBalt^ pliijsics appraisal Significant appraisal
f Indinss end
KFPPLER.J G Region 3. Chicago, Office of the Director BO/06/13
3pj>
aiu^ids iiv.iUiotiiniB or LSI' Tnplcr. 1I1-IO rt.UJl-11 A t.
JIII-:i D TIT ulsc t-rii ii I BIJB Ji t nm|icinonto HuiiuostB rcjilij
"Ithlit t:0 ilnyis IP »n~biiilt fiicilily if if for s from lictnalnu
R1JTCHF1FUI}, 1) N tl|>iii alii>g
llpp
'/UO^O'l niruuiil!, appllcntlrpn to nmnid Liconut l>fli~l> Tvch Specs t.
mon-loif Tut li E>p«tu< I no uric I
i D P I a n n umn r » PHIUOI In tiD/O/^O? lp
007HOi30V /ipplmiiinn til ii4noinl Mctmvii DPR 6. revising ncrosslty of
flttolnint) roll! Htiuliloun uiMlu < (ililluc t Iny t unit, i nineii L sprjii;
iijfl ouTvpl 1 luni u last
BEH1TT. II II ConournoTil I'uuoi- fu 110/07X07 Hp p
— B007240QOci MotltP of violation Prom insp on B00303-14
» Region 3, Chicago, QFflca Df the Director 80/06/05 lp
—8007200009 IE Insp Rept 50-1 55/BO-04 on 000303-14 Honcomp 1 lances noted
inadequate oFfshift radiation protection coverage t<
joailequate lugfi radiation area access controls
GHEGER,L R , CARBMJGH, E II Region 3, Chicago. Office of the
Dii-octor FISHER. U L Region 3. Chicago, Fuel facility Si
Materials Safety. Branch f3»/06/03 37pp
BO 070 3 0(131 Forwards IE! Bulletin 00-15. "Possible Loss af Emergency
Nat-iPmatian 3ujs (ENS) H/Loss af OPPeite Pouter " Written
roBponse required
KEPPLER, J O Region 3. Chicago, BfPlcB of the Director BO/06/1B
1 I 1 *) 4 IJ !< Tab]'' 11 4 3 •) for
007110210 Tt'tli iipiicn 11 11 n
containment »prn>j D-IJU
• fiotiinimiH"! I'nuiitr Co lHi/0//d/
rii.(,pniiifa to nmi:ilH llr tn a Alicflino iilijpcUnu- OTI S
innefi of ji inn tit tindur 'Jtl' rvviow, to currprvt plona for
•puditntl rnvivu of imvlron qiidi] if tra tinn op alcr tvi cnl
inlpiriniit (-'urui^iTitn «|ip 1 n flti 1 B mumoriiridiKH J. orJer
NTIWI, H II (Iff no n(> Nnrlcrtr H("ni.tnr Utiflulntifln, Dlroctoi
3/07 /I ft ^pp
F-oiuunli NUEI- IlMiV. "fUrui tirr*l Aiifllyain (if Spent Tuol Pool
ner f< Concrcile line In- Con 1 ant Hj n roiluriM" Df naff mart
tOf,SO llr to DM Ci uUJiPif'ld ?• rulutEi) NU'i oF Ml.ltiL
r» in support ui 7*;j'UM fl|ip I iai t IITI fur fli nmpnii
iLLCI.J Iiihnm. J inriilii f. llenlc nn/O//«M Ll|iji
PlVyyw DI-.I iifrnn bt.ili)', nf luntino " 11 di?(|rflituil n f 1 1! vult.Jijc !•
PHHrtfi) of ilnt-jon ului Li 1 1 d i • ti i hull iti> i>ijn vnltiKje'i.
r /VW'!';i *i IHJU.M*' i nmmi Lmuiili, fiiiliiio inmpluli? [ v nl uilt i on
Jiitdi in |ii Diirui r. ItDUi'oii'Mm tn (,|it'» lli'inn f nr Lhcnmi n»
D)3 (iiueiuiiuin Piiwni fld (Ifl-'n//;1^ IP
ni>npttii>n ii'l'irtb H HullntiiM. '< itnt«*faiidl<nt0
IfldllV f in WiOUlt It llullbtJn HO I'1- "(rnikinu in \'ure Eipray
"'PI LR, ,1 0 Knpjnri :i, 1,'M r ,11311, llffirw tit I Ji D lllrpc.t»r BO/0'l/IJ
ForiuariJa IE Circular BO-15, "Loss of Reactor Coolant Pump
Cooling !( MatuTal Circulation Cooldoun " No urltten responec
rtniitroa
HEPPLER, J 0 Region 3, Chicago, Office of the Director BO/06/HO
B00717O174 rnryaroa IK Circular 80-lfl, "Radioactive Contamination of
Plant Demlneral i i ed Mater By& I* Resultant Internal
Contamination of Pcrnonne-1 " Nn uintten response required
KEPFLER.J 0 Region 3, Chicago, Office of the Director BO/06/24
IP
B007O1O3I3 Responds to IE Bullottn 80-06, "Engineered SaFetv Feature
(ESf-"> Reset Coiitroln " Actuation drawings for designated sys
have been reviewed All equipment except Por listed Items e &
i meet acceptable crltona bosnd on drauinqs
HOFFMAN, 1) I1 Consumers Pc-unr Co BO/06/23 3py
800714D43O Ac k receipt «P BOObO'i Itr informing NRC of stopE taken to
corrutt vlalationi, notei! in II Inup Rept D0~l 33/flu-03
Keglun 3 comment', re util reb|iori5e to Item 1 end Utll
poaitlon nt>t fully responsive
HIND, -J A Rpgion 3. rhiciQO. Safeguards Branch BO/Oib/26 lp
3007230312 Formorils IE Rulletin UQ-16, "Potential Misapplication of
ROBemount Inc Moduls 1151 Ji ll$3 Pressure Tranomi tters
U/Eithei- A or D Output Codes " Written retponse required
Id Cinu-lar OO-li alsu encl No written response re^utred
KEPPLER, J 0 Fit?oion 3. Chicacjo. Office of tlie Director 00/06/27
lp
TWO ill i II IH4P Hi-i'l- '''I I'^/dd-Cd nil r«)0!j(15-OFJ No
nc ompl iaiiL ti 1111 It if
ISKWAN. fl t Unit ion ^, lnlL.in.li. Hi-artui tip in .it it.nl NuclCflr 13itp(iorl
f> tin H'>i)509-Hf) Ni> nutK nflip 1 l«"ico
innpinti'il folloMHp nl items »fi f4URFO-097B
Bi)OP»'t(»U"/ mcntiiMi lu'lwaim WIN *< Uronseo
.H n Unuli.n •'• Cliir/iflD. i^firp i>f the Biroitu
BO07IEJOS75 Notifies that time clock op Item S of IE Bulletin BO-17,
"Failure of Co-ntrol Rods t-n Insert During Scram -it BUflj "
uil] start ab IS 01 i\H on BOO 70S Test should be completed
uithin 3t> days |lei[ue^ts notification of malfunction
KEPPLFB.J O Region 2. Atlanta, Office of the Director BO/07/07
9007140-1^4 Forwards B PC fit if I Power Corp "Si*tu-Day RBSPOTIKB to IE
Bulletin 81>-11 "
HOFFMflN, n P OtmBunioTB fowar Co HO/07/09 lp
DOCKETED ITEMS
2i
— BO0714042B "aijty-Day Response to IE Bulletin BO-SI "
* Baclitel Corp BO/04/3O 32pp
0007140444 Responds to IE Bulletins BO-OS. "Eiamlna tion o* Containment
Liner Penetration Welds " Penetrations ui/fltieii head design 6
designs u/CDntainment boundary butt tields between
penetration sle«ve & process piping total 114
HOFFMAN, D P Consumers Power Co BO/07/09 4pp
8007150664 Responds to IE Bulletin 00-17. "Failure of 76 of 135 Control
Rods to Fully Insert During Scram at BHR " Design of scram
discharge vol sys different From Hi-puns Ferry, Tetti roq."*reil
by bulletin completed ft acceptable
UITHROW, 0 C Consumers Power Co 00/O7/10 2pp
B00716045B Responds to IE Bulletin 8Q-1O. "CCmtamtna 1 1 on of
Nnnradioactive Sys & Resulting Potential For Unman i tared.
Uncontrolled Release of Rjdioactivi ty to Environ " Review of
sy* complete Documentation available during onsite insp
HOFFMAN, D, P Consumers Power Co 3Q/O7/11 Ip
DOCKET !iu-15(, UtJIV OF WISCONSIN ((ESEAflCH Rt'AC IOH
Q Inspection i-epoi t^. IE Bulletins *i L on espoii-d etii. e
BO0717Oi&2 Forwards IE Circular BO-lt "Riid inactive Contamination of
Plant Dominersl 1 1 E<] Hater Sys I< Resultant Internal
Contnminat 1 on of Personnel " Mi) uritteti response required
KEPPLER.J Q Reginn 3- Chii.ani>, OFfite of the llircctor BO/Clf,/SH
IP
II Periudic
;roling reports
BO0731O4O3 Forwards "firrnual Operating Kept f-nr License R-71" For
Jul 197^-June 19(30
GASHWtTLL, R J Wisconsin: unw of. Madison BO/U7/11 Ip
— 1300731040') "Annual Dfi era ting Rppt for ! icensif fi-Tt. " for JLI! 197'
19BO
J Wisconsin, llniv aF. rladison (JR/O7/11 150pp
B007JB0134 Forwards response to IE Bulletin BO-17, "Failgi-e of 76 op
189 Control Rods to Fully Insert During Stram nt CUR "
Primary sys will not o»cesd design pressure In c-vent of
ATMS
HOFFMAN, D P Consumer! Pomsr CD SO/O7/14 19pp
DOCKET 50-137 COflNEt-L UNIV ri£riEARCH REACTOR
Q Inspection repurti, IE Dulletins It correspond elite
H00722O432 Forwards affirmation for BO071O response to IE Bulletin
BO-17, "Failure of 76 of 1B5 Control Hods, to Fully Insert
During Bcram at HWR " Affirmation should lint attached to
response
HOFFMAN, D P Consumers Power Co
B007220472 Responds to NRC 000626 request for add! info re IE Insp Kept
30-155/00-03 Requests Issue of plant securitv sys
aperability be maintalnxt as an open item pending
resolution
HDFFMAN.D P Consumers Pou»r Co aO/O7/l(b l(i
B007160BO3 roriuardB IE Circular BO-14. "Had loat 1 1 vjs Cnntdminat i 0" of
Plant neralnnral i lod Hater <3ys 'i Resultant Intel nal
Contflnl nat i nn nP Personnel " Ho mritten i ospons.0 required
•ORIEB.B H ReDioti !, Phi 1 adc 1 plun, OFfjce of the Dirocbor
aOYOfc/afl Ip
0007310159 Fniuordi 1C Info Notice BO-34, "i oiu Level ffaduaste Durial
Criteria " Mo uritttn reapniisi1 rpqi>ired
ORIER.D H Region 1, Phi 1 .nli> 1 p hio. tlFfitc of tliu Director
Ip
8007230463 Submits addl response to IE Insp Rapt 30-159/90-09 Request*
that plant security su.s operabiliti| Issue be maintained1 a*
open item pending resolution by NRC (• licensee
HOFFMAN, D P Consumers Pou*r Co BO./07/16 Ip
BQO7230316 Respond* to NRC 800613 1 tr ro violations noted in IE In up
Rupt 50-155/QO-Ofl Corrective actions util will establish
neu supervisory training position to insure upgraded
radiation protection training of plant staff
HQFFHAN.D P Consumers Pourer Co BQSO7/1B Bpp
BO07340017 Forwards affirmation inadvertently nmitted Prom 000709
response to IE Bulletin 00-11
HOFFMAN, D p Consumers Pounr Co BO>O7/1B 5p p
B007230373 Responds to IE Bulletin SO-li, "Potential Misapplication of
Roscnount, Inc Models 1191 & 1132 Pressure Tr antijiU ttora U/
Either A or D Output Codes " Four pressur-n transmitters of
identified type eiist.Dne hat output code in question
HOFFMAN, 0 P Consumers Pou.r Co 8O/G7/2J 2pp
BOO72906O6 Responds to IE Bulletin 8O-17, "Failure of 76 H f IB!} Control
Rods to Fully Insert Durino Bcram at BUR " Emargency
operating procedures have been revised to assure
appropriate operator actions in event of scram
HOFFMAN, D P Consumers Power Co 8O/O7/H3 3pp
8007390691 Responds to IE Bulletin BO-17, "Failure of 7i> of IDS Control
Rods to Fully Insert During Scram al DWR " Hod imp lumen ted
to provide alternate vent path to CPU tainmonl bldg
atmosphere
HOFFMAN, D P Consumers Pouer Co SO/O7/H5 2pp
R Psriodic operating reports d related correspondence
B0070Q0346 Forwards monthly operating rept fo-r Juno 19BO
HARTMAN. C J Consumers Pouier Co BOXO7/O1 Ip
— BQ070BQ340 Monthly operatlno rept for June J9BO
HIMEDAUCH.N Consumers Pouer Co BO/07/01 3pp
DOCKCT 30-16O GEORGIA INST UP TECH RESEflRCfl
Q Inspection reports. IE Bulletin!, *< i 01 retp onclpni e
11007I7O1HO Forwards ILCirculur BO-lfl. "Rail 1 nar ti vc rmitamiii.itlan of
Plant Dcmlrleralued Water BIJS t, Boeultant Internal
Ciintamlnatioii of rcrsomirl " Nci written, response required
0'REILIY,J P ReQion S. Atlanta, Office nf th£f Dlroctor BO/06/34
BQCKFT SO-16'J CfcMCIiM ATOMIC CCIMnANV
F Security, medical, emergent tj f< f i r f pintuction plans
B007P3OOBI Requests reonlutinn of nutet«nding tao ib&ues For certain
phijBical 50LUT i ty-rcldtod UdCiimente *• cmprgencii plans (lEmo
ntd 79091O re 7TOHPO guard tr .lining plan subni bted by <!A Co
never an 6 were it
JIIUEft.W 0 litcnKe Pee Management 3rani.li 30/07/16 £pp
O rnspectiun reports, IE llulletins !> tni T e tpani enco
BOO/1B03/''I Foiuiardi IE (.iicular 00-14. "fldfl i nnt 1 1 vo < ont.iminati nn Of
Plant Deininera] 1 1 ed W.itur 'jij* t; Resultfint Inteiiial
Cc-ntaninat ion of ['erEimnEl " Nn ui i t tun response- ti>qiiiretl
ENGELHEN, R II Rtffiion •>. Sun I-T anc 1 110. IlFPice nP the Uirectnr
BO/Oi/34 Ip
UQCKCT 30-1A6 UN1V OF HAHVLAMCI Hfal-rtHI-H RtMIOIi
0 Inspeition reports,, IE llullctn.i t. L nrrc'.pomJt ni e
BOD7160ai3 Forusrila It (,iicul/ir BO-11. "R.jd j nor 1 1 vo ('Dntrimindtt an of
Plant Oeniineral i ii-il Water *'ijs '' Utn.ulL.int Inteirii.il
Contnrninatiuii of Porsunnel " No written rr*>pcinse rennlred
ORIER,n H Rpuion 1, Phi l.i Jelph i a. Flffici of UP Director
aO/06/2-l 1 p
aQQ72101'l3 Foru-^rtlE IF Info Mobile t50-E4. 'I HIU L-ovPl Ratlwastii Din lal
Criterin " No uiittun Te.£paii»i' rpquii ed
CRIER. D IT Re (fieri I, Phil,irtolphi<i( nr Cici 1<F HIU Director
IP
R Poriudit opera! ii)|| reports I, relnti-'il t on t".|inii<H'iiL
fiiitirails njieiatiuiii n-|.t fm June I1!/'? ti> June WfJO
L t1^rijl«nil, Ui.iv nf l3O/O'/f)J flp n
0071606)33 Foiuards IE Ciiculai E1O-14. "UrtJiOdt tl ye ( on tamtiiBt inn
Plant Cfi^lreraliretl Water lye 6 II intuit ant Internet
Contamination at Per^nnnal " No written response required
CHIEF!. 0 J) Heglan J . Phi 1,-jd plph i .), Office of the Director
80/06/21 Ip
DOCKET 5U-lf?(, UNW OF MISSOURI nE9EA.F)(.H
B Inspection reports. ]£ Bulletins J, correspondence
B007170653 Forwards JE Circuldr BQ-14, "Radioactive Cuntami not ion of
Plant DemineralUBd Water Bys !< Resultant Interndl
Contamination of PiT&omjel " No written t esponso required
KEPPLEFI, J G Hi'ginn 3/ Chicago, Office of the Dnoctor BO/O6/24
Ip
007210394 Forwards Ifc In?" Nut its BO-24, "1 Qu U'vel llddwaito Uur
CTitavla " No written response rrn.uireil
GJHER.B H Region- 1. Pti 1 1ml i> 1 ph in, Office of thu fiirnctoT
Roporlablo occurreti-CBB, LbRs If related c oprespnndcncB
DCKCT 50-J7I P&rtCH HOTTDfl ATOMIC PfJUEFt HTMION. UNU i
Security. ffl»dital. umerg PHCIJ !. fiie protection plans
JO7140 »u! FDTur.irrls Input for fire nrotection rovii>u TO flro detection,
mater Euppri'5 M on. t omliust i b 1 e conti-cli pns Mipprc sa 1 oil. F»ra
door? & interior fiose stdtioni
HALL.W E llroolili.JvEii National Uahorntliru an/Oi-/PO Bpji
General carrflsp oiidcnc a
1070201V7 Bequests, consideration of site viBll by Atomic energy
Council of Tannin on (TOQBr33-?fe CQUJICI! Interosttd in
observing waste mgt actt\iti&o Coopora t i on uill bo majnr
cotitnhut i on to NHC eichangc nrrnrig-omeTit
D (\ssi3tant DirfiCtor fin Intorna t i onnl Cnup erat 1 an
3pp
072B0549 Rfl^pniiOs to BOO'lSO 1 rt- re JL !i US Fiandell crmcerns about
smflrsencij planning Di«cuFi5es vvirimit options for Funding
offsitfi support agencies Publir annountennjiii fur fiirlHtu
emergency planning mcBtliia ia&ued on 0003'H U/Randoll Jtrs
Df*tc« of the b'l&cutlvi1 Director for Operations
7pp
CKET 3Q-1EI2 PURDUE UNIV fiF^eARCH RFftt-THR
Inspection repurta, IE Bulletins !« c nrrt1 t.ponilenco
J7I70A1! FortiarOs ]E Circular BO-14, "Safl I uatlivo rontamina Citin af
lant Demtneral lied Mater BJG !. Rosultnnt Intornnl
lonlaniination of Pevsunnul " N« written response requ'rud
(EPPLEfl.J S R«gion 3. Chicagu. Office of the Dlrertnr flO/OA/24
P
,RET 50-181 NrtTIONflL BUHertU Or BTANDAfiflS
Operating JUonse atuge dDcument', I, t nrresiinnilenci!
1713002(1 Forwards Amend 3 to Lie en IP Tli-5. aa tp ty evaluation & notice
f Issuance & ava i lab 1 1 1 ty
IILLER.J R EHaniMrdliflCloii (H Qfiocia] Projcctt Drancli BO/Od/30
P
WO an BOO-JO1?. emergency generator foiled to st.irt Wh
otarting 9pnuonci> initiatsil Caused by starter motor trip doe
to lack of Fuel In emergency generator day tank Tank
refilled ti sight glass added to verify tank fuel level
HCMnBEN,J C , BfUIQGER.R M HiSBOuri. Univ of. Columbia
00070802^0 HO on BD051 6, automati c regulating blade drive mechanism
failed Caused h ij mnrii apot on drive gear Gear drive aosembly
replaced f, oladp cyclnd through Full travel to assure proper
H
MCKIBHEN,«JC
3pp
DRUGCER-n M MlBsoUTi, Univ of. Columbia
BO07140351 RO on B0061A. uh i 1 e verifying sample Joflding of triple-tobod
aample )rrddiatErt facility located in ctr test hole. one tube
was found (niosing 3-irtch lung Gpater No unreviewed safety
quCBtion cnuted during period of operation
MCKIDDEN. JC . flLGER.D M Missouri. Univ of. Columbia 80/07/O7
Hpp
UOCHET 50-107 SPACE RflDlATIDN RESEARCH REACTOR
fl .Inspection repor-ts, IE BulletiriH & correspondence
B007180370 Foruiards IE Circular 00-14, "Radioactive Contamination of
Planl l)emineral i i ed WotBr By s d Resultant Internal
Contamination of pertonrpl " No written response required
ENOELKEN.n H Regie* S, Han Francisco, office of the Director
BO/O6/24 Ip
DOCKET 50-193 PHOtJE ISLAND t, PROVIDENCE PLANTATIONS ftEC
F Bectirltij, medicali emBrgency t, tire protection plans
BODV02O49O ForuurdE Amcni) 7 to License K-9S, ref 1 nc ttng atato 7903OS
qoc ur 1 tit p Ian
MILUERi J Fi Standarduation 6 Special Projects Branch BO/06/17
2pp
— BO(l7OS0493 flfnond 7 to License R~95, ref lor ting state 790S05 security
p 1 an
MILLER, J R Standard! ration 6 Special Projects Branch BO/0A/17
Hpp
P OpoTatitig license stage documents ft correspondence
OO7I50033 rtmend 1 to Uicenne TR-a, incorporating Tech Spoci contalnft
in App A r« reactor care
MILLED. J B Standardisation T< Bjujcial Projects Drnnth 00/Ofa/SO
0007020470 Forwards Amend 7 to LI tense R-9S. ref IBC ting state 790203
• ecur i ty) p 1 an
MILLER. J li Btandardiiation tc Spe^cial Projects Branch BO/Od/17
00713003' ^afpt(j eva]-udtirm siippnr 1 1 rig Amund 3 tu I icons* TR-5
" QfPlm oP Nuclear Henrlcr II^Qu lotion. Director BO/06/C10 2p p
O7130041 Hutim of UEwonce * availotiiUtu n* Amend 3 to License
TR-a
MILLER, 0 R Eitflndanlliation ti Hpotiol Projocts (Irani h tlff/06/Sa
3ft
Inepoction re|ioTts. IE Bui 1 etm<-, t,
Forwards IE Cifmlar HO-14. "Radioar tl ve Contamination
mineralued MBtBr Siji !< Retultmib n>iBrnnl
ontamindtioTi tif Pcrsnniel " No wiitton respnnsa req.uirBd
HER, D H Rejion 1, Phi] jdclph t ,1, Ufficn nf H,P jjiroctor
Ip
731014? Forwflfifs 1C IrtFo Notlca BO-^1. "Low Ls^el HniJuiii
riteria " No wH Itsn responae tpfliilrPd
UER.D H Region 1. PhUado Inliifl, f)ffid> of till' mrret
VOfi/35 Ip
lant
— BO07O2049:i Amend 7 to UiceTiBS R-93. ref lecting state 79QH09 security
f Ian
MILLER. J R Sbandardiistion Ji Special projects Branch 8D/Oi>/17
3pp
B0070903721 Advlaee NRC tliat rept re itonpower reactor physical
protection upgrade requirements uill be submit tod to NRC by
B006O1
DIMESUIO-AF Rhode IBlanrJ, State of SO/07/01 Ip
a Inspection reports.. I& Bullctin« ft correspondence
S007(AOB37 Torwards IE Circular Bo-14j "Radioactive Contamination oP
Plant Deminerali t ed Hater Sij s & Resultant Internal
Contamination or PursoTinel " No written response renuired
GRIER. 0 H Runlet, i. Ph i 1 ado Iphia, Office of tho Director
B00731O161 Foruiai-ds IE Info Motice BO-24, "Loul Level Raduiaste Burial
Criteria " Mo iiipi tten response required
BR1ER.B H Region 1. Philadelphia, DPFlce of tho Diractor
BO/Oi/25 Ip
DOCKETED ITEMS
27
DOCKET 90-197 MANHATTAN COLLEGE RGBEAflCH REACTOR
0 Inspection reports, IE Bulletins t< c nrreBpondone
800721015^ Foruiard5 IE Info Motita B0~?4. "Low Level RatfuaBt
Grit or id " No written response required
OBIEBiB H Region 1, Philadelphia, Office of the Director
BO/Od/SB lp
0007160922 Forwards IE Circular 00-14, "Radioactive Contamination of
Plant Demineral i tea Water SIJB fc flesultant Internal
Contamination of Personnel " No written response required
ORIER.B H Region 1, Philadelphia OfFucD of the Director
BO/06/24 lp
0007210127 Forwards IE Info Notice BO-24. "Lou Level Raduasta Burial
Criteria " No written response required
ORIER.B H Region 1. Philadelphia, Office of the Director
BO/06/23 lp
DOCKET 30-201 WEST VALLEY REPROCESSING PLANT
I Financial information
8007010001 Forward a audited financial statements consisting of
ttotements at of 711331 & 781331 in/auditor rept Affidavit
only end
CONTI.P L Nuclear Fuel Services, Inc (suba of Getty Oil
BO/03/2B 3pp
P Operating license stage documents t< correspondence
BQQ7Q&Q34t> Advl5EG that emergency notif icot I on ays tslephona does not
T-oquire onstte auiiliary pouer ^uppliji in response to IE
Bulletin 80-13 Test to vonfy independent power- uii 1 1 be
conducted uiithin neit 3D flails, ifui-irig scheduled pouier outage
DUCKWORTH, J P Nuclear Fuel Services. Inc , He->t Valley Reprocess ing
Plant 80/06/36 lp
QQ0721G03B Advises that on^ite auiiliarv paucr supply IE not required
in response to, IE Bulletin BO-11 Insp revealed that
emergency noti f icatlon ty5 dnes no>t receive poupr from plant
supplyi TeGt of emergency diosel gnnei-ator uii 1 1 be conducted
DUCKWORTH, J P Nuclear Fuel Services, Inc IEUUS oP Getty Oil Cp I
BO/ 06/26 lp
0007330*41 Foruiards response to NRC 800617 Itr re defitlBnty noted in
IE Irsf> Kept 5 0-20 1 /BO- 04 on BOO 5 1 9- J I Encl uiitJiheld (ref
1OCFB? 790)
DUCKUOffTH, J P Nuclear Fuul Bervicts, Inc (subs of Getty Oil CD )
lp
DOCKET BO-206 GflN ONDFRE NUCLEAR STrtTION. UNIT I
F Security, medical, emergency !< fire protection plans
8007020919 ftc k receipt of Apr 1900 monthly rept & 6O0330 1 tr TB inap
& evaluation of facility lilgh levol storage syi Copies will
be dlvpatchvd to encl external distribution Hit
HAUOHNEY.C J Advanced Fuel !, Bpsnt Fuel Licensing Branch
00/06/01 3pp
BOQ702Q078 Ouffitione intentions, as calicsn-see. re NFS 760932
announcement of uli thdraual from commercial reproceaoing NI?C
considers plans for future of facility to bo joint
re*nansibili ty
CUNNINQHAM.R E. Division of ru>el Facility t, Materials Safofcy
BO/06/08 3pp
E10O70B0271 Advisee that revisions tp safeguards contingency plan uill
be submitted by B007IB
K. P Southern CaliPornia Edison CD ao/07/Oa lp
0 Ad juiH catori) correspondence
6007030126 Requests that encl listing of addl pe titlcns, received from
CA residents under 10CFR3 S06 for facility seismic
conditions, be added to 79ltv13 Itr an file All have received
WRC 791BI3 Itr w/FB notice re notice of receipt of jmtition
SMITH. H Operating Reactors. Branch 5 BO/06/31 9pp
B0071409BQ Riquvsti info re future 1 (tensing h operation of facility
Request* reply within 30 days
CUNNINGHAM. R. E Division of Fuel Cycle Si Material Safnty BQ/0(b/o3
App
0007230117 Urges strong support & cooperation In Rockuiell Han ford
Operations program to Insn Ii evaluate condition of high
l»val liquid waste storage siji NFS inoUterice on pr-lor
agreement impedes gathering of necessary info
DIRCKS'M J, Office of Nuclear Materiel Bafety t< QaFenuards
80/06/86, 4pp
0007090384 Notification of BOOB13 meeting u/vendnr In Silver Spring. MD
to discus* progress of NF8 efforts to process technical info
n»d*d to provide basis for future decontamination l>
decommissioning of facility
HAUOHNEV, C J- Advanced Fuel & Spent Fuel Lkcenslng Branch
BO/06/27 3pp
B007140193 Bummarij of 800618 meeting uf/NFB I, NY atato Ennray RfcD
Authority in Bllvor Spring. MD re decontamlnatian fc
decommissioning technical dflto processing !. potentlnl
tornado gunerateit miislltt contequences
)(AUDHNEY,C J Advanced Put! & Spent Fuel Licensing Branch.
BO/OA/27, Kflpp
BtKJ73l02'13 Foruards Cnmmlsaion BQQ537 memorandum t< orJ er containing
deciiions pn UCB 780503 petition for reeons ideratton of
7D04I3 nujmoranilum d order UC9 7711O4 petition •sought action
re fire protection for electrical cables
EIBEHHUT.D Q Division of Licensing (30/06/SE B*?pp
H Oeneral correapondence
BOD702OIS1 Requests consideration uf having Atomic Energy Council of
Tniman visit facility on BOOS04-OS Council interested in
oboervlnu waste mst activitieE Cooperation will be major
contribution to NRC eichange arrangement
tAFLEURiJD Assistant Director for International Cooperation
flO/OS/13 3pp
8007170049 Forwards US map phoulng location of redctors licensed to
operate, under const or planned, in response to 800536 Itr
H McCann added to mailini} list of petitioners ro-queBting
facil i ta n hut down
CRUTCIlFIELD, D M Operating Reactors Hranch B BO/07/03 lp
-8007170051 "Nuclear Pouior Reactors in US "
« Energt), Dept of 79/10/31 3pp
80072B0069 Notification of BOQ717 meeting u/NFH k NV Stat» En«r|jy Rt-D
Authorilij In Silver Bprinfl<MD to discuss indemnification t>
liability IHHJOB agsoclated u/implementat Ion of wori bu
Rockwell Hanford Dpintloni
HAUOHNEViC J Advanced Fuel !< Spent Fuel UicBnting Dranch
BO/07/09 lp
8007170037 Roquesta map of US showing location of nucloar reactors
licent-ed to operate, under const or planned GipresBen
opposition to Facility operation
MCCrtNN, M Affiliation Unknomn 60/05/26 In
P Operating license stage documents ti correspondence
0, Inspection report*, IE Bulletins & correspondence
B007020714 Foruardi IE Bulletin BO- 13, "Posilble LOB* of Emiroency
Notification Bys (ENB) M/Loss of (JPfsit* Pouier " Written
r»«pona> required
ORIER, B. H, Region 1> PhilNd»lphia, Office of the Director,
SO/06/ 1 8 lp.
0007110401 Forwards response to 790908 request for info re adequacy oF
ciFfdte power ti/t ft onsite dlstrlbu tlon >ys
BABAIrt.K P Southern Califurnia Edison Co SO/OS/m t3pp
Forwards Amend 4? tn LUense OPfl-13, safely evaluation
notice of issuance Ii availability
CRUTCHPIELD, D M Operating Reactors Branch 3 HO/0&/29 Bpp
5007160703 Forward* IE Circular 80-14, "Radioactive Contamination of
Plant Dvmlniraliiod Hater Bys & Resultant Internal
Con fc em (nation at Personnel " No written i-enponn rfrqutrae
CRIER, B H, Region 1. Philadelphia, Office of the Director
80/04/B4, lp
8QQ7100IQ2 Amend 49 to License DPR-l.lr replacing ref tn cycle-specific
ejaeted rod uiorlh* ti predicted fuel center-line temps
CRUTCHFIELD.D M Operating Reactors Branch 9 8O/05/B9 Sjip
B0071001OS 8sf"ty evaluation supportinu Amend fl9 to License DPH-13
» Office of Nuclear Reactor Regulation* Director
DOCKETED ITEMS
EJ00710010/ Wot! to of isEitatiCf
DI'H-13
ClUimif-ItfLO.J) h Operating
anility of ftmend 1"? to Licenso
"ranch 5 6O/05/S9 3f p
JOVOIOI1/ F-oruiarrfs final rule published in 8O05Q? FF) amending
IQtTflfllJ 71 la leiiulrp periodic updating of FBflRs Compliance
IB not required until compiption ot SEP
LOi D Onerijt i rig Reactors Branch "i BO/06/ 1 0- 5pp
B00715O579 Forwards "Post-Accident Sampling Sy s. Capab i 1 i ties >.
Description. " I* drawings, in response to open item identified
in NfiC 000S03 Itr re implementati an of TMI lessons learned
requirements Draw ing 3 available in Central Files only
BA5KJN,K P Southern California Edison Co SO/07/O9 2pp
— B0071SOSa7 "Post-Accident Sampling. Sy t, Capab i It ti es ft Description "
» Southern California Edison Co 90/07/09 5up
JU/02O170 Requesta coop erat i on (n MIC study of people-related
prdblome m riucleni industry
CHUTCIfFlFU". U M (Ipeiating Henctors Branch 5 BO-/06/1I 5PP
RDqitests Giibnittal of pTopoeed Teih Spec changes providing
for redundant if in dpc.iij host removal disability in al] mode?
OF operation Hndc 1 Tei h Spots which uoiild pruvide acceptable
Teaalution out 1 for guidance
EISENHUT, I) 0 Division oF Luensing 00/O6/I1 fc2pp
BQQ73BQQ1B Forwards NHC evaluation oF control rod guide thimblo uieai
issue Eased on revi eu, j ssue i& resolved1 For 14x14 fuel
asiambl IBB designed by tfts.ting house
CRUTCHFIELD-!) Operating Reactors Branch 5 BO/O7/1Q 4pp
8007210033 Noti-Plcati on of 800734 meeting ui/util In Rosemefldi CA to
discuss results of Imperial Valley Dct 1979 earthquake
andli|5isi using Unit 1 anal ytical modeling technique
RDOD.H Licensing Branch 3 HO/O7/11 2pp
0710031? Hunpunds to 00032? 1 tr whirli eiprcssed opposition to ACrtS
recorrnnundat inn fcn T L'itruc ture SEP HoEe -OF licenapes in
program will eiparid Ltr Forwarded to Commissioners
DCflTOHtH It tlfFicp of Nuclear Rein: tor Bpnula 1 1 on. Director
H()0711)n4i!(» Eipi-eiEPB u&position to ACtt^ ret araracrtdat i on to restructure
S£l> for srp niuncrH to perFoira safety analysiB as outlinndi
cost in dollars- 6 manpower uoirld increase- dramatically
fiClfftFFSTAI I..H SFP dinners Group BO/03/29 3pp
17niO4ft3 Forwards add! info re SEP Topic VI-4 !, drauiioos re
Dntainmi'nt isoUTtioji sijg. In reBponte to NflC B00417 (e Otl2
tra Draining & av.i 1 1 ob 3 P in (entrol Files only
"rtfJKIN. K P SouHiern -falifornia Edison Co BO/Oii/33 Upp
forwards Amend 50 to Licensp OPR-13 t. notice of issuance
vailability
ffUTCHFlELD, D Oppratlna R#mtors Branch 5 aQ/Ob/25 flpp
B007SB007& l)D°.pDnds tn aOO31B Itr to J Ahearne Objecting, on behalf of
oiLinerfi of plants under SEP review, to current plane for
BipBdited revlaw oF -enuirun ijual 1 fi cation of electrical
ffnuipmont Fo-ruiarilG applicable memor-andym !* order
DENTON. H R Office of Nuclear Reactor Keaulationi Director
00/07/lii flpp
Ac* receipt of NFIC response? In Marine Revieiu Committee
771O09 ropt re facility radiological monitoring program
evaluation Detailed" response mill be submitted Fallowing
mat! review
FISCHER, ML California, State oF BO/O7/1B lp
BOO72'J07Oi. 9ubmitE r*6pors05 to Itemc i.S fc 3 Of NfiC 000620 Itr re
failure of saltwater cooling sgs Response to Item 4 will be
submitted by BQOBO4
MAYWE3,J O Bogtharn CaliFDrnia Edison Co BO/07/24 3pp
Inspection reports. IE Bullotins ti
IK172201&2 ^Iraend SO tn LicetiEB QPIi-113, revl si ng certain provisions to
reflect cJinngBs in cci-poratB organi jst 1 one 1 structure
CRltTCHFlEE.D,D Dpc-rfitlng Reactors D( anch 5 BO/Ofa/33 llpp
00/3201 (.3 Notice of issuiincc -tr availability of Ancnd 90 to License
DPB-13
CHUTCHFIEun. l> tlporating Reactors Grancli 5 BO/Oii/35 2pp
7Q2Q3bB Foiuords flmpnrf 91 cons i sting of iProposed Change *73 to Tec^
Hilts for Apps A t< B -n P License OPR~ 1 3 Proposed Change 93
oqueatl mod nf Tpch Upecs to revise definition of
operaBle' to comply ui/def i n* ti-on of STB
IFTCH, I) gnutliern Colifornia Edieu-n Co ao/06/30 lp
3070? (K)ft* ftpplicnttoti Pur Amend 91 to Litenae DFR--13, consisting of
Prtipo-sed Chnng-e ''3 (noil if ij ing TeCh apecs to revise definition
n» "uperahle" to ccifnply w/d eFin i tion used in BTS CeTtlPIcate
of Svc Dnt!
DIETCH.n Soutlitrn California £J*5on Co 8D/OA/30 7pp
10JO3Q3/S Proposoil Tech iipcc 3 0 For Limitirt^ Conditions for
Operation (Ocnerall !, revision to Section 1 0 re
def In! tioni
* Southern California Bdloiin To BC/Oh/30- 5pp
070TO4 Urg«i. oitcmsaun nf tommBnt peiiod for MUREO-0577 S. 8O0519
ipnd until R009I3 Moru stringent ToquirDmants, broader
pltcatilltij d EPRI itinlg results uarrant. adill time
LMANiD W E3an Olego Gas t. Electric Co BO/O&/30 lp
9;i Anvlsi'5 of NHC flLrcplance of flmend 3 to Topical Rept.
f-l-A. "UA Prngrflm " Topical rept must be rofpreticcd in
apter 17 of K/lB
ASa.H P Qu.iUby ABiUranco DTanc^ CO/07/01 lp
PSOOnl Hequor.ts i,itLmi ttal oP application Prir emend to licen<e
nainttng of Tflch Spec changes ti ticcnse tonditlons PUR
..el Tech Sptcfl d Model license conditions for Trtf-2
B-oono Lcarnoii t.-douorij A items encl for giriilance
EFIJIIUT-D a Division of Licensing 80/07/02 6*?pp
:0017i! r oruarilB NRr D valuation of SEP Topics 111-10 A, V-l 1 A.
-7 C I t< l/rlI-3 0 Evaluation will be input to safety
sesannrnt. unl BIS- change* nocdPd tc reflect a'i-built
idi t ions
JTCHFI ELD. D M Operating Reactors Branch 5 BO/O7/03 17pp
3007390833 ftesponifB to IE Bulletin EO-O4, "Analysis of PUR Main Steam
Line Break U/C-antinuei Fee dual IT Addition " Scoping studies
wilt be completed by 900313 Studies include effect uf
auilliary feedwater runout t impact of other energy source*
OrmSDN.H L Southern California Edison Co 60/05/12 Spp
80072SOA3& Responda to IE Dulletin 79-27, "Loss of Non-Class IE
Instrumentation ft Control Pouisr Ey-a Bus During Operation "
Failure Hindu E. offsets analysis indicates loia of vital hui
or util bus uill not prevent achieving cold shutdouin
OTTOBOH, H L Southern California Edison Co BO/05/19 9pp
0007200073 Buppls B00512 reajionBe to IE Dulletin B0-04i "AnBlyais of
P»!t Main Steam Line Break U/Cont inu«d F«eduiater Addition "
Results of scoping studies. l< repartab 1 1 i tU iJs termination
uill be Foruarrieil uhen available
OTTOSDN, H L Southern California Ediflon Co 00/05/19 Hpp
800711O174 ForuarilK IE Imp Rept 50-20A/BO-O on B00123-S3 t- notice
of violation
BOOK. H E Region 3. San Francisco. Fuel facility t< tlateriaU Safety
Branch 9O/Q5/23 Spp
— BO0711O171? Notice of violation from map on BO 0423 -2 5
» Region 9. San Francisco, Office oP tJie Director BO/05/23 lp
--B007110IB4 IE Insp Repl 50-204/HO-13 on 90-0423-33 Nan compliance noted
failure to fnlloui radiation protection procedure required by
Tech Specs
BOOK, H 6 Region 9. San Francisco. Fuel Facility & Materials
Safety Branch JDUKOFF, P , NORTH. H B Region 5. San Francisco.
Office of the Director 80/03/33 22pp
BO071BOQ14 Foruiflri!& IE Insp Rapt SO-a06/BO-l 1 on B00121-3S No
none ompl lance noted
SPENCER. 0 8 Region 9< Ban Francisco. Reactor Construction &
Enainuerlng Support Branch 9O/O8/23 2pp
— B0071BO01B JE Imp Rept 50-206/90-11 on 800421-39 No nonconp 1 ionce
noted Major areac inspected inKervice insp activl ties. maint
tt repair activities on pre-siuriier Eafe-ty valves, licensee
activitiBE li pers-onne-l interviBU5
HAI3T, D P . NARBUT,P P Flegio-n 5, Ban FrancilcOi Office of the
Director, DODDSr R T Region 5, San Francisco, Reactor
Construction & Engineering Support Branch, 80/OS/E3 7pp
QO0703024fi ForuiardB IE tufa Notice BO-2Sf "areakdowna In Contamination
Control Programs " Mo written response requirod
ENCELKENjR H Region 5. flan Francisco. Office of the Director
80/09/28 lp
DOCKETED ITEMS
2,9
B007230358 Responds to IE Bulletin BO-13. "Decay Heat Removal Bys
Qperabili Ity " One event, reported in LEU 77-03, involved
degradation of docay heat removal capability for several
minutes Emergency t, main procedures revised
BABKIN.K P Southern California Edison CD 80/06/09 6pp
800.7310163 Forwards rsvieu eunvnary in response to IE Bulletin BO-05 re
Vacuum conditions resulting in damage to chemical vol
control sgs holdup tanks Bys reviewed are adequately
designed to protect against vacuum conditions
P Bnuthern California Edison Co 8O/Q6/O9 3pp
8007330349 Forwards IE Info Notice 80-26, "Evaluation of Contractor
HA Programs " Ho written response required
ENSELKEN.R H Region 5, San Francisco, Off ice of the Director
BO/Ot/lQ Ip
8007030010 Forwards IE Bulletin BO-19, "PosHible LOBS of Emergency
Notification Sys (EN3) W/Loss of Off&itc Pouer " Written
fesponae required
EHOELKEN.R H Region 9. San Francisco, Office of the Director
BO/06/18 lp
BOO7O2047B Forwards IE Circular BO-13, "Loss of Realtor Coolant Pump
Cooling d Natural Circulation Cnoldouin " No written response
•penuirod
ENQELKEN.R H Region 5, Ban Francisco. Office of the Director
BO/Q6/20 lp
SOO724031B Forwards IE Insp Rfjpt SO-B06/BO-I5 on 80052B-C1Q No
noncompl iance noted
SPENCER, 0 S Region S, Ban Francisco, Reactor Construction ft
Engineering Support Dranrh BO/06/20 3fl p
— BOO7210336 IE Insp Rept 30-306/80-15 on B00528-30 No noncompli anc B
noted Major areas inspected insp activities pet- IE Bulletin
79-13 re cracking in feediuater ays piping
HA1BT,& P Region 9, Ban Francisco, Office of the PlTector
DCDD3, R T Region 5, Ban Francisco, Reactor Construction &
Engineering Support Branch B0/06/HO 5pp
— 8OO/17O579 IE Insp Kept SQ-<2O(>/f5O-12 on S3 004 Ob -03 02 Noncomp 1 ianc P
noted- failure to folluu pro:, criurff re i-ource range
instrumentation detectors ti to implement Fullij IOrFR3Q
parting requir ernmits for ladtntion area
MlLlEHiL Rcgipn ">, S»n Franci &c o. DPfjte at die Director
FrtVILKEHBERRV. n ttegion •). B.in Frame i uco, Ruattor Operations
Nuclear Support Branch flO/05/28 3pp
BC071OQal7 Notification of 000710 meet NIB u/util in Itethasda, MD to
distu&s results of steam generator inspa t< cnirpttive
act! ons
HOHICM.S J Dp era t »n<| F!e..ct(ir5 Branch S BO/O/VO? lp
H007300331? Foruards IE I-nsp Bepl 50- 30fr/HO-30 on 80061 fa- 19 No
notic ompl i ante not-ed
CREH3. J L Region b. San Francisco. React gr DpErotions Nuclear
Support Brantli BO/O7/09 2pp
IE Insp Rept 50- 30&/BO-SO on OO061i-19 Ho none amf 1 1 ance
noted Majoi ai-eaE inspettod major mainti major survei 1 lancei
IE. bulletin J< tlrcular follDuup !i i ndoperiden t insp effort
HORN. A J ffegion 5. San Francisco, Offnc of the Director
FAULKENBbFlRY.B Region &, Bark Francisco, Reactor Operations
Nuclear- Support Branch BO^OT/01? 3pfl
BQQ7S3Q3B3 ftck receipt of BOO7O1 1 tr informing NUC of steps taken to
correct vloldtioti noted m Ib Insp Rept 50 -EOi/flO-1 4
BOOH, H H Region 9. San Fi-.int I arc. Fuel Facility ti Materials Safety
Branch B0-/a7/l& If-
— 000723&3B7 Rasponrta to NRC aOfJfall 1 Lr IP violatmn noted in 1C Innp
ftapt SO-BOfa/90-tfl Coi-rec tivp actions frequency of air-
s.amples inside steam generator* hu-, buen incr-csaed tc- once
per shift
PrtPAV.L T Southern Cal i ff,i nifl Ertiaon Co BO/0//01 2po
—0007230291 Forward-; !C Insp Kept HO-2QA/BO-14 on B00fll5-l!) f. notice uF
vio 1 ation
BDOK.H E RBffion 5, Ban Francisco, Fuel Facility fc Materials
Safety Dranch BO/06/1S 2pp
BO07180393 Forwards IE Circular UO-14. "Radioactive Contamination of
Plant riDminoraliiHd Water flgs & Resultant Internal
Contamination of Personnel " No written response required
ENCELKEN.n H Region 5, Ban Francisco. Office of the Director
80/06/34 lp
B 0072 30 394 Forwards IE Bulletin QO-16, "Potential Misapplication oF
Rosemount Inc ModBls 11S1 & 1152 Pressure Transmitters
U/ELithar A or D Output Codes " Written response required
IE Circular HO-1 1 also end No written response required
ENOELKEN.R H Region 3, Ban Francisco, Office c-f th s Director
SO/06/37 lp
aO073flOH67 Forwards IE Insp Rept 50-S06/BO-10 on BOOS19-23
No noncomp 1 iance noted
CREWSjJ U Region S, San Francisco, Reactor Operations Nuclear
Support Dranch BO/06/27 Hpp
3007230293 Notice of violation from map on HOOIlb-lB
» Region 5, Ban FranciECJJ, Officp of ttie Dirpttor 80/06/10 lp
B007330297 IE Insp Rupt 50-20i>ye!}-lrt on HGOIiS-ia floncompl i.ince noted
failure to perform airborne actlvifcu surveys
DDQK.H E Region 5. San Fianoieo, Fuel rariUtij l> Materials
Safetij Dranch CUHT1S..I R . MI1FUH, H Region 3. SBti Francisco,
Office of the Director nCl/Od/lO Ipp
R Periodic operatlna reports t. related c n
8007010316 Foruiards "1979 Annual Operating fleptiBfln Onofre Nuclear
Oanerating Station." Wol S. n i o.l og i t^l t' Ut eanugrapliit Data
finalyses Includes ETS fur Unit 1, ( Qnst '. primperatinnal
BiDnttori ng programs for Units 2 !i 3
P Boutfiern Califurnia Edison Co aO/0£t/25 lp
— BG07B4Q273 IE Insp Rept 50-206/80-10 on 800519-H3 No noncomp 1 lancp
noted. Major areas inspected surveillance of pipe support t>
restraint sue b IE bulletin/circular follouup
HORN, A J Region 5, Ban Francisco, Office of the Director
FAULKENBERRV, B Region S, San Francisco. Reactor Operations
Nuclear Support Branch 80/06/27 3pp
BOQ7H5Q35B Responds to IE Bulletin 79-03A, "Longitudinal Weld Defects
in ASME SA-312,Type 304 Stainless Bteel Pipe " Review
of piping revealed no piping ays eiceeding code
alkauable design stresses
DTTOSON.H L Southern California Edison Co 80/06/30 2pp
0007170541 AcV receipt of B00616 Itr informins NRC of steps taken to
correct violations noted in IE Insp Rept SO-aofi/BQ-12
CHEWS. J L Region S, San Francisco, Reactor Operations Nuclear
Support Branch BO/07/01 lp
— 8007170569 Responds to NRC EOO&2S Itr re violations noted in IE Insp
Rapt 50-a06/BO-12 Corrective actions instrument ti teat
technicians cautioned that use nf procedures necessary
Required signs posted
PAPAV.L T Southorn California Edison Co BO/06^14 4pp
— BOO7170569 Forwards IE Insp Rept SO-206/BQ-12 on BOO405-O5O2 *, ndtice
of violation
CREWS. J L Region S, San Francisco, Reactor Operations Nuc 1 oar
Support Branch BO/03/2B Spp
— BOO7O10356 "1979 Annitnl Operating Hept.San Uiiufre Nuclear Qcneratinn
Station," Vol 5, I) lolog t ca 1 >< DC aanograph i c Data Analysts "
Includes CTB Par Unit li const <« (irwcipprattcinfll monituring
programs for Units a ft D
* Brouin & Ca 1 due 1 1 " Lotfcli c-ecl 6nvironmcnt.il Seism-tea »
Marine Biological Consul t.inta , Inc , aO-HD-10O BO/06/SS
BOOpp
BOO710026S ToruiHTilE "Bioloaical !- Occanogrflph K Date Analyies
Unit 1. Const Monitoi-ing Proaratn far Units 3 & 3.
Fi-eoperational Monitoring Prn|)Tam f&r Units P !. ^ t. Special
Study re Ichthuop lank ton, " vc.1 5 for 1979
L Southern California Eitlson Co OOVOfi/3O 2p
CT1^ for
— aOO71002(,B "Biological Si Dt eanogrophic Data rtnalgaes tTS Far Unit 1.
Const Monitar-ing Prograjn for Units C & 3j i*roop errati niia 1
Monitoring Program for l/liila 2 't 3 ti =5(ipclal Bti-ittLj rn
Ichthi|npl«r.(Ltoji. " Vol 5 for 1979
ArtBERG.P J Dr-oun !. CaldueH ftNDFRSClN.D T Lockheed
Environmuntal Sciencus ftneWftP. V, Mdnne BioloaiCdl Tonan 1 tants,
Inc . BO-RD-IOO t30yOfa/30i BQClpp
3007150599 Forwards monthly operating rcpl for .Juno 19SO
CUR RAN, J M Southern CalifDn.iri Ldison Co 8O/Q//OH
lp
— S007150faO5 Monthly operating inpt for June 1980
JOV.J M Southern rallfnrni.l ErtitPri rc 0n/D7/1H 3pp
-BOO7170S73 Notice of violation from insp on 800405-0503
» Region 3, San Francisco, Office of the flirector SO/OS/3S
3pp
DOCKETED ITEMS
S Reportable occurrences. LEHs. '< related correspondence
B0042103UU PNO-V-80-1B an B00310iSfllt water cooling sys out-oF-svc
for approi 41 minute* due to broke-n pump shaft North pump
started but discharge valve failed tn open Auiiliar-y pump
started but failed due to pump priming EU.S
FAULKENBERRV. D Region 5, San Francisco, office oP the Director
BO/03/11 Spp
9007030021 PNQ-V-80-033 on B00619, film badge data of subcontractor
iflployee indicated e»posurp eiceeding quarterly limit Bc-lf-
readino dosimeter readings indicated significantly lower
eipoiure Validity of data being examined
CURTIS, J, WENEl.flHSKl,F Region S, Ban FmncUco. Office of the
Director BO/06/SO lp
8007310591 Requests add! info re failure of saltwater cooling sy-s D
80D31O Info about events where multiple BHuipment failures
occur (< contributing factors mould be- hPneFiciat
LAIMASiOC Assistant Director for Safe ty , AsscsBment flO/06/30
4pp
BOO7Q1O533 Forwards LEU BQ-037J03L-Q
DTTOSON.H L Southern California E<l I son Co
2pp
— 8007010537 LEU BO-Oa7/03L~0 on 800329. rad i agmph i c e lamination of
feedwater sys uelds Inside containment found seven
unacceptable defects including lack of penetration^ porosi tg
d flag inclusion Caused by original const defects
CURRAN,JM Southern California Edison Co HO/Q6/&3 lp
B0070S0403 Fur
OTTOBON.H L
ardi LER flu-03S/01T-Q
Southern California Edlso-n Co
3pp
--B0070B0410 LER BD-02S/OIT-0 on SO041H, during IE Bulletin, 79-14 Snap,
inadequate pipe guides discovered in safety injection sys
injection lines Caused by Improper installation Guides will
be modified before return to svc
CURRAN.J M BoutSern California Edison Co BO/06/3Q lp
B0075B0391 Forwards LEfl 80-OB't/QIT-T
OrrOSONiHL 3outh*rn California Efllton Ca (30/07/16 3pp
—8007300396 LER 00-024/01T-T on 600516, uh i le perForming rarf iogrnph I c
examination of main steam linesisn ueliis found
ui/Vnifitationi in EICCSS nf code Apparentli) caused by const
error Meld in/tracts in root repaired
CUHRANiJ H -Southern California Edison Co 80/07/16 lp
•-HOO7aB0104 "Bignlfirance of Circumferential Ueld Indications in 21-Incfi
Main Steam Piping at San OnoFro Nuclear Oaneratins Station
l/ni I 1 - Fracture Analysis "
CIPOLLrt.R C , OROVEH.J L . EOAN.G R Apteth Engineerinn Services
flO/07/31 64pp
W07BB037& Foruard! LER BO-027/O1L-0
QTT0SON.H L Bouthepn Californifl Ed i Kon Co
2pp
-BOQ72803B3 LER flO-029/OlL-O on B007flB. RCS dilution infld vertenlly
occurred uhilv containment integnti) was gnev tab I icliod
Caused bu. leaking Inflatable plugs in generators Gen.i-atop
channel heads discontinued
* Southern CBlifornia Edi*on Co BO/07/21 lp
IOCKET 50-308 COLUMD1A l)NW RESEARCH REACTCR
Inspection reports, IE Bulletins & correup onflenc e
n F.wumr** \K Circular m-l<l. "nadi0active Contamination of
Demlnefalijeil Hater Hgs & Resultant Intarna]
BO/D6/24
|fTe»""1 ''
,
Pffice of the Director
itten r«»ponsn required
"1 '' Phili"lBll"lii" f'M
of lt,e Director
DOCKET 50-313 HADDAM NCCK
F Security, medical, emergency >. fire protection plans
B00710019i Foruards MRC H00425 1 tr ta all power reactor licensed*, in
response to BO0329 Itr re emorgcncy response facilities at
reactor sites Sites in/approval to use c 1 osed-c ircuj t
television link lu/ technical support c tr listed
CRUTCHF1ELD, D M Operating Reactors nranch 9 00/O7/O7 Spp
— OQ071BQ30a Requests copy of NHC 800433 Itr tn utlla updating
requirements for emergency response facilitiea fc technical
support ctr List of plants u/apjiroval tn use c loEed-c ircuit
supervision link u/tac hnica 1 support ctr requested
HICKEYrA E American Institute for Research in the Oehavioral
Sciences SO/O5/29 ip
B007010337 Commants on proposed lule IOCFR30 regulation far firo
protection eiceotively specific (, unjustifiably restrictive
8ug()»steil revisions ta App R u/justl f I cationt encl
CDUNB1L.W Q Northeast Nuclear Energy Co (subs nf Northoost
Utilities) CQUMBIUH 0 Connecticut Yankee Atomic Power Co
COUN3IL.W Q Northeast Utilities BO/06/16 31pp
B007030356 Comments on proposed rule 10CFRSO requirements far eiceed
those necessary to resolve generic IBSUHS 6 are oicesnivolu
specific ti restrictive Forwards automotive App R
firo protection program
CDUN31L.U 0 Connecticut Yankee Atomic Power Co flO/Oi/16 lfcpp
B007Q9023I Fgruards rc-sponees to NUREO-Ot.34 criteria t. facilities
emergency plans per NRC B0051H (. 791O10 Itrs Encls available
In Central Tiles onlij Emergency plans withhold (ref
10CFR2 790)
COUNS1L.W G Connecticut YanJiee Atomic Pouier Co CDUNBIL, H G
Northeast Nuclear Knerny Co (subs of Northeast Utilitlsi)
BO/06/30 2pp
H007170t25 Confirms position discussed in B00621 tolcon re .afeouards.
contingency jilans NHC requeeted ravisloni are Ill-advised i,
unnffceBBflry Specifics nf plan imp 1 cmentaeion can be
detailed in procedures
CDUNgiUW Q Connecticut VanJcee Atomic Power Co CQUNBIL, H 0
Northeast Nuclear Energy Co (subs, of Northeast
BO/O7/01 3pp
per GH Smith
*a^10nB *° b° und "•*"»••' *• ^omple
telcons u/MO Kounsil.re emergnncy
preparedness capabilitlnfl identified in 800623-0703
appraisal N»C must Be notified in H4-h If not agreeable
2S!«2',LH ReBio" '• Philadelphia, Office of the Director
00/O7/O3 2pp
O ftd jud Icatorij
8007310243 Forwards Commisnion 8O0327 memorandum I, order contain I no
decisions on. UCS 7FJ0302 petition for reconnideration of
780413 memorandum & order UCB 7711O4 petition sought action
re fire protection for electrical cobles
EI8CNHUT.DQ Division of Licensing 80/06/S5 Bfpp
I Financial information
DOD7HO35B Foruiarda eatlmBted 1-7BO cash flows for facility
O'CONflER.L A Connecticut Yankee Atomic Pouier Co BO/O
P Operating license stage documents it correspondence
BO/Oi/H? 4pp
riuflr'fH final r"lu P«»Hahed in BOOD09 FP amending
71 tn require periodic updfltlno oP F9AR5 Compliance
is not required until completion oP BEP
CnUTCHFICLDi D Operating Reactors Branch 5 BO/04/10 9pp
S007230099 flequc-sts submifct^l of proposed Tech Booc changes providing
for reflundancij in decay heat removal capability in all model
•of operation Model Tech Specs uihicli mould provide accentoblo
resolution encl For guidance
EISCNHUT.DB Divi aion of Licensing. HO/06/11 62pp
£1007340036 Informs that NHC has completed review of info provided in
util 700A26, 791017 fc BOO423 Itrs re positive dlspl.cement
vifcratioiiK Operation will not cause Fatigue failures In
chemical vol control sus NRC considers matter closed
LAINAa.O C AssiBtant Director for- Safety Assessment 80/06/16
--0007310061 Safety evaluation re charging pump vibrations Fatigue
failures not antic ipatotl by operation of metering pump
» Assistant Director For Safety Assessment BO/07/ii ip
DOCKETED ITEMS
B007100397 Responds to 000339 Itr ujhith expressed opposition to ftCRS
recommendation to restructure 6EP Role of licensees in
pro-gran will expand Ltr forwarded to Commi ssioner 5
DENTQN, H R Office of Ngc 1 ear Reactor Regulation, Director
aO/06/19 4pp
— BOO?1004SO Eipresses opposition to ACRS recommendation to restruc ture
BEP Fai SEP owners to perform safety analysis »6 outlined,
cast in dollars & manpower would increase dramatitallg
BCHAFFBTALL, R SEP Dinners Group BO/02/29 2pp
BOO7OB0549 Clarifies B003O6 j Bsponne to NRC 791030 request for info
concerning Lessons Learned Task Force Item 3 1 B a, improved
post-accident sampling capability Info ensures accurate NF1C
understanding of design philosophy d intent
CGXJNBIL.W 0 Connecticut YanVee Atomic PouiHr Co CDUM5IL, U Q
Northeast Nuclear Energy Co (subs of Northeast Utilities)
30/O6/23, 3pp.
B<MJ73S069t Advises that NRC has approved conceptual design of post-
accident sampling sys Lists several addl areas which should
be addressed
CRUTCHFIELD, D M Operating Reactor* Branch 5 BO/O7/01 3pp
— Q00734O05B Propustil amended A.p.p A safety Tech Specs Section 6.
reflecting title changes uithin utll organi lation
* Conne'Clic ut Yankee Atomic Pouior Co BO/O7/TI 7|ip
--DOO7H40O62 Proposed amended App H, ET9 Suction •> 1 5j r cFlec ting title
changes uiitriln uttl organi i st i on
* Connecticut Yanfcee Atomic POUIOT Co BOV07/3) 4pp
8007340067 ftpplicatinn for amend ta License DFFJ-il r B ETS Section
243 1 ( 1 1, modify i ng gaseous rclyase rale limit to one
averaged over 1-h period
COUN51L.H O Connecticut Yankee Atomic Pouer Co aO/07/lt 3pp
— BO0724OOVO Prupotcd amended ETB Section 2 4 3L( 1 ) . mod i f y ing gastnn.B
release rate limit to one averiisoct over 1-h period
* Connecticut Yankee Atomic Power Co 80/O7/3] 3i>p
B007aB007t Responds to B0031G Itr In JAhearne ob JEC (.ing • on behalf of
owners oF plants under SEP rcviou, to current plan; for
eipodited review of environ quill i F i cat i un of electrical
equipment Foruiards applicable memorandum ti order
DENTDN.H R Office c-f Nuclear fleactor ftogulation, Director
fiOO?aa01O3 Forwards request for addl info re adequacy of station
•l«ctric distribution sya voltages Response requested mithln
45 days of Itr receipt
CRUTCHFIELD- D Operating Reactors Branch 5 BO/Q7/01 5pp
SOO7agoooi Requests aubmittal of application for amend to license
consisting of Tech Spec changes t license conditions PUR
Model Tech Specs t Model liceniiB conditions for TM1-2
L«ssons Learned Category ft items cut 1 for guidance
EIBENHUT.D O Division of Licensing 80/07/02 6<?pp
Advises that NRC has completed review of plans to implement
It«m a 1 4 of Category A lessons learned requirements
Measures taken constitute acceptable resolution of concerns
eipressed In NRC B009O7 Itr
CRUTCHFIELD. D Operating Reactors Drench 3 BO/07/03 3pp
BOO73801BO Forwards request fop addl info re testing of reactor trip
SLji t< engineered safety features Response requested by
BOIHOI
CRUTCHFIELD, D Operating Reactors Branch 5 BO/07/07 3pp
B00721023? Submits corrected Page 1 of Attachment 3 to utll B00321 Itr
ra lou pressure disc int«gri ty, summary of arguments From
BOO33B meeting u/NRC re disc integrity tt answers to site-
•paclfic general questions
COUNSIL, W Q Connecticut Yanfcee Atomic Power CD BO/07/OB lOpp
8007280206 Forwards NRC evaluation of SEP Topics 111-10 A, V-ll A, VI-4,
VI-7 C 1 £ V1II-3 D Evaluations will be input to safety
assessment, unless changes needed to reflect as-built
conditions
CRUTCHFIELD, D Operating Realtors Branch S BO/07/00 31pp
BOQ72SO&72 Foruiards NRC evaluation uf control rod guiifE thimble wear in
PUR Issue resolved for 13X15 fuel assemblies designed by
Hsstinghouse
CfiUTCHFIELD, D M Operating Reactors Branch 3 80/07/10 4pp
BOO 7300331 Discusses BOQ&30-O701 site audit by NRC It Franklin Raeeapch
Ctr re environ qualification of electrical equipment, SEP
Topic 111-12 Info provided Si requested during audit encl
Proprietary portion withheld (ref 10CFH2 79O)
COUN9IL, W 0 Connecticut Yanfcee Atomic Power Co QO/07/14 23pp.
—-Q00730Q331 Forwards summarg of results of evaluation of envii>on
qualifications of safetu-related electrical equipment
Evaluation Indicates that electrical equipment at facility
uoulfl perform safety functions to allow safe shutdown
SHITZER.D C , FEE.W F Connecticut Yankee Atomic Power Co
7B/03/06 23pp
— BO0730033B Forwards "Special T4 Teledyne Valve Operator Perfarmane* of
Unit in Bteam Environ Indicated in HestinghousB Equipment
Gpat Q&7&33B " Rept updates t< supplements Table A-i attached
to NRC 7S0306 Itr
COUN9IL.W C Connecticut Yankee Atomic Power Co 7B/07/27. 2pp
— S007300342 "Special T4 TelBdyne Valve Operator Performance of Unit In
Steam Environ Indicated in Uostinghouse Equipment Spec
0676258 "
* Connecticut Yankee Atomic Power Co 69/IQ/2Q I Ipp
B0072400B3 Application for amend to License DPH-&1 re App A. lafety Tech
• Bpecs & App B, ET8, ref letting title changes within util
orB'niiation
COUNSIL,VI Q Connecticut Yankee Atomic Pouier Co BO/07/1& 3pp
B0073B0473 Requests e x tsntl on of comment period re HUREG-OS77,
"Potential for Low Fracture Toughness !< Lamellar Tearing on
PHH Steam Gene-rotor tt Reactm Coolant Pump Supports," until
800915
CDUNSIL.W 0 Northeast Utilities BO/O7/21 3pp
0 Inspection reports, IE BulleLins !. t c-rr esptindenLe
6007O5O14O Forwards IE Info Notite BO-23, "Urea* down's In Contamination
Control Programs " Mo ui-itten rebpcnse required
ORIEFi, E H Flegton 1, Phi Sailel ph to. Office of the Director
Bo/os/aa ip
B007O10275 ForuardB IE Info Mnticu 80-33. "Loss of Suction to Emergency
Feedwater Pumps " No written icsponse r-equirei
DRIER, D H Region 1, Philadelphia, Offico of the Director
BO/ 03/2 9 Ip
BOO7170494 Responds to IE Oulletin PO-12. "Decay Heat Removal 9ys
Oji Brab 1 1 1 tij " Qased on noted TC-VIDUI& of sys !< proc eduro si
no chanaeB to eiisting proceduies or harduiart1 ar* conaidore-d
necassarij
COUNB1U.W 0 Cunmecticut VanVee Atonic Power Co 130^06/09 3pp.
8007310539 Forwards IE In*o Motice Dft-26, "Tvaluation of Contractor
OA Programs " Nn uiritten reaponse required
CRXERjDII Heglon 1. Phi lodclph i«. Office of the Director
80/Ob/lQ Ip
BOO716034'! FaruiarifE IE Info. Notice 130-57, "Li-gradation nf Reactor
Coolant Furap Stud's " No apotiflt action or response
requi rad
OHIER.BH Region 1, Philadelphia, DfFire of the Director
90X06/11 Ip
BOO7B30361 Forwards IE Insp Rept 5Q-S 1 3ABO- 1 O on B00519-23 No
noneompl I ance not«d
MARTIN, H S Region 1. Phi 1 udel ptila, Safeguards Branch 00/Ofa/J I
— B007a303bb IE Inap Rept SO-aia/BO-lO on a0051?-R:i Mo nc-ncompl lancc-
nofced Majjof areas int.pected securlt-ij plahi spcuviiy
organiiation *< prot-Pctnd d vitnl areas physical liiarrier-s
Details uisthheld Iref 1OCFRH 77O>
LADUN.R H Region 1, Philadelphia, office of tl.e Dii-cctor
DEVLIN. J W Region 1, Philadelphia, Safngudril 5 Bianch QO/Ofa/O
IP
»007170aao Responds to IE Bulletin BO-OA, "Engineered Snfetij Feature
(E8F) Reso* Controls " Three Facilities will have complete,!)
mods per IE Bulletin QQ-Od by 810101 List of equipmL'Tit !i
status of criteria encl
COI/NB1L,W 0 Connecticut VanHee Atomic Pouior Co CQUNSIL. U 0
Northeait Utilities BO/O&/13 43pp
e007OSOi92 Forwards IE Bulletin BO-15, "Poasiblii LOSE of emBrflencij
Notification ay B <EN9> U/Loes n f OFfulte Power " Written
response renusre-d
ORIER.B H Resion 1. Fh i lad elpfc i .1. Office o* the Director
BO/O6/IQ Ip
0007100137 Eubmit5 reply to IE Uulletin SO-OH re elimination of
containment liner penotratic-n ui&krts l>uo to alisence of
abnormal t ond i tl on 5, no furthprarlmtv planned
COUNSIL.W 0 NottheaTtl Utilities BO/Oh/19 llpp
32
DOCKETED ITEMS
9007020196 Forwards IE Circular BQ-15, 'LOSE, of Reactor Coolant Pump
Cooling f- Natural Circulation (.onldaun " No written response
requi red
GRIEffpB H Region I, PM lailc 1 p-h IS. Qfficp of the Director
00/OA/3O Ip
BO07aiiO535 HO on BOQ7I7, uh 1 1 e investigating reactor coolant pump seal
water flow prob lems. seal water supply bypass Valve 3 failed,
allowing full flow through valve Valve was clamped closed,
coolrloun commenced & valves replaced
GRAVES, Fl H Connecticut Yankee Atomic Power Co 00/O7/21 Bff
BQ07iaQ97S Responds tn IE Bulletin 00-1O Plant design !< operation
reviewed to identify nonradi oac tive sij.5 which could become
radioactive through B.U.S interface* Routine sampling program
ousts foi cadi sijs to identify iinmonitored releases
CDUMSIL.H Q Connecticut Yankee Atomic Power Co BD/Ot/23 ?pp
00071606^0 Forwards IE Circular BO-14. "Radioactive Contamir
Plant Deminer-dli ivd Water 11)5 t, Rosjltant Internal
Contamination of Personnel " flu written response required
GflIER.0 H Region 1. Phi Idtfelph i a. Office of the Director
BO/O6/2-1 tp
DOCKET 50-219 OV3TEH CREEK NUCLEAR POWER PLANT
F Security, medical, emergency & fire protection plans
0D07020D1O Forwards nummary of 79070i mgt meeting re status of scheduli
for upgrading facility radiation protection program Minutes
do not contain proprietary info Meeting identified need far
plant hoslth physics audit program
SHIER. n H Region 1, Philadelphia, Office of the Director
80/06/04 3pp
B00721QI74 Forwards IE InFo Notice BQ-24,
Criteria " No mrlcten response required
QFUEH, 0 H Region 1. Phi ladol pn i a, Offi
'Lou Level Raduaete Burial
if the Director
BQ0723O1Q7 Forwards IE Bulletin HO-li. "Potential Mi sappl itation of
RasEinount Inc Models 115-1 & 1152 Pressure Transmitters
U/Either A or D Output Codes " tlrittun response required
IE Circular SO-li also entl No ujritteti response required
CFtIER,D H flpgioti 1, Ph 1 1 ade 1 pfi ii>. OFFit? of the Director
30/06/27 3pp
BOO7160349 nesponds to tf?]LOri request For info re results of tur-hine
map perfDrniEd tfuring 1930 refilling Outage Uti 1 intends to
conduct r-t-it insp during IfSl outage based an submitted
Info Confirms that rated pouer for operation is appropriate
COUNSJL.WS fonnPCticut Yanhee Atomit Power Co BO/O7/09 2p p
B0073304II Foriiiar-ds rept on Core 9 fuel insji as part of post-
irradiation Gian of fuel assemblies
GRAVES, R H Connectitut VankeP Atomic fouler Co BO/07/16 7pp
Periodic operating reports ?< related correspondence
B0071Q0390 Foruards montnlij operating rcpt For June 1930
CRAVES, R H Connecticut Vankee Atomic Pouier Co SO/07/11 Ip
—60071H0375 Monthly operating rept ^or June L9BO
t Connectni/t Yankee Atomic Poiuer Cn &0/07/11 12pp
Reportaftle occ ur-renc
IDO?020536 PNU-I-SO-092 on BOOlilfi, lah i le ferfOTming test on low pressure
safety injection pumps under runout cond i tlonsi parti al
vacuum was drawn an RUST Licensee investigating apparent
cause Plant shut dawn far refueling until BDO713
SMITH, JJ H , HEIMIG,H R . BHUWNEH. E -J Degion t, Philadelphia, Office
of the Director SOVtU/lA !p
0070Q007/ RO 8O-06 on B00632, durl rig draindoun of refueling cavity to
refueling uiater storage tan*. grab 5 Jimp IE indicated
radioactivity in tank eiceeding ETS Caused by Cfud
displaced Snto RHR mnlant sys by testins
GRAVES. R H Connecticut Yankee Atomic Power Co BO/07/O1 2pp
30714035-9 RQ DTI BOO6B2, dur ing drsindoiun of refueling uafcer storage
tan« cavity grab sample indicated that curies ticeedeil ETS
limit of 10 Caused bij crud dt ep lacemunt into residua] heat
rejiKTVal sys Tank placed on rec Ire ulat i on mode
ORAVES.R H Connecticut \anfcep rtto/nit Power Co BO/O7/O1 2pp
0007030399 Foruards summary of 79OS30 mgt meeting re planned fc
completeif imprnvements in licensee radiation protection
program Licensee IE on schedule For upgrading program
Summary contains no proprietary info
GFllEfJ.B H Region !. Philadelphia. Office of the Director
OO/Ot/04 3pp
B007I1011D Summary of 000433 westing w/util re emergency, planning
NOUICKI'B J Operating Reactors Branch 5 00/06/Od 4pp
B00701O399 Confirms B00613 mgt meetinfl in Kins of Prussia. PA to discuss
actions talien & planned by licBnaee to improve radistion
protection program at facility
CRIER, B H Region 1, Philadelphia, Office Df the Director
aO/06/11 Ip
fl0070aoi 93 Requests cooperation, in NRC study af prople-relatad security
probleina in nuclear industry
CflUTCHFIEtD-D H Operating Reactors Branch 3 80/06/11 800
B007 090262 Notifies of dclau in Implementation schedule for
installation of alternate water supply per safety
evaluation Table 3 1 Caused by engineering (• manpower
problems Alternate uatar supply inill be completed by 801101
FINFRaCK, I R Jersey Central Pouer !< Light Co BO/07/03 6pp
•0 M judicatory correspondence
B007310343 Foruards Commission B00337 memorandum 1 order contalnlno
decisions on UCB 7SO302 petition For reconsideration of
7G0413 menorandum & order DCS 771104 petition sought action
TH fire proteetidn For electrical cables
EISENHUT.D 0 Division of Licensing BO/06/E5 89pp
107090321 Foruarits LER 90-OJO/ulT-O
GRAVES, R H Connecticut Yankee Atomic Pu
Co 30/O7/04 Ip
BO071BOO60 Responds to B0031I rpituest For info needed for fuel cost
study Forwards mcerpt* of WASH-740, WASH-1224, WA6H-1230,
WASH-1400,NUREe-0020 (Vol 4,Number 1 ), NUREO-OflBO, NUREQ-OSia,
NUflEfl-0317, NUHEO/CR-106O 1. FES
DENTOW, H R Office of Nuclear Reactor Regulation' Director
BO/05/1J IBSpp
— 5007190063 Requests documents containing infu needed for fuel cost
atutfij
HILCER.H Affiliation Unknotun BO/03/11 Spp
P Operating license stage documents !< correspondence
6007230023 Summary of S002O7 meeting lu/Marti I owners group in Bethesda.
MDi re revisions to NFfC acceptance criteria t< outstanding
issues relative to Mark J containment long-term program
GRIMES, C T Plant Systems Branch BO/oa/21 31 pp
BOO7O903Sei LER EJO-O1O/01T-O on BOOiai.pei1 IE Bulletin 79-14i five
Eelsmic-typE supports determiriBil missing from two separate
HPE1 lines ^ t«JQ addl supports found w/uicesa gap Caused by
Failure to install restraint! ri'quired by piping drawing
THOMAE.R H Connecticut Yankee Atnmit Power Co B0/O7/04 Spp
J anncd release occurr
', out start Total of
3 9X of Tpch Spec
from waste
Region 1, Philadelphia. Office
S 007 100394 Forwards Amend 48 to License DPR-16, safety evaluation b
notice nf issuance J. availability
CRUTCHFIELD, D Operating Reactors Branch 5 80/06/02 Bpp
— BOO7IO04O1 Amend 4B to License DPR-14i approving mai average planar
linear heat generation rate limits & multiplier for five 6
Four recirculation loop operation I, deleting specs for fuel
no longer in cnre
CRUTCHFIELD. D Operating Reactors Dranlti 3 80/06/02 14pp
— 8007100405 Safety evaluation supporting Amend 40 to License DPR-16
• Office of Nuclear Reactor Regulation, Director ao/Oi/02 4pp
-B0071004OB Notice of issuance t. availability of Amend 4B to License
DPR-16
CHUTCHFIELC, D Operating Reactors Dranch 3 80/06/02 Spp
33
BOQ7SSO534 Forwards NUFlEO-Ofal9. "BWft Fi>eduatei- Noiile (, Control Rod
Drive Return Line Noule Cracking," For review fc comment
CRlfTCHFIELD, D M Operating Reactors Branch 3 HQ/O6/04 2pp
B007010113 Forwards final rule published in BOO3O9 FB amending
10CFR90 71 to require periodic updating of FSARs Compliance
is not required until completion of SEP
CRUTCHF1ELD, D Operating Reactors Branch 9 HO/06/10 9pp
800703O3QO Urges response with in 3D days to BOO303 request for flddl
info ra util 790935 & 1101 Itrs concarning degraded grid
voltage & adequacy of electric distribution sys voltages
Seven paints need c 1 ari f icdtion
LAINAS/G C Assistant Director for Safety Assessment BO/O6/16
3PP
3007)00399 Responds to 600329 Itr which o*pt-BB9ed opposition to ACttS
recommendation to restructure SEP Kale at 1 i t undoes in
program mill oiparid Ltr foruiarded to Commi SB 1 aners
DENTONiH R Office of Nuclear Reactor Regulation, Director
80/06/1B 4pp
— BO071O0420 Expresnec opposition to ACRB recommendation to Toetruc ture
SEP For SEP ouners to perform safety analysis HE outlined,
cost in dollars & manpower mould increase dramatically
BCHAFFBTALL.fi CEP dinners Group 80/02/29 2pp
0007010168 Notifies of Intent to commit to implementation of addl TMI-2
related requirements when acceptance criteria is- developed
Forwards util initial assessment of applicability at 33
requiruments
FINFfiOCK. I R Jersey Central Pouer (. Light Co 80/06/23 6pp
0007110324 Notification of B00630 meeting lu/util i'n He-thesda.MD to
discuss util proposed action concerning visual indUcat ions
of cracKs in core spray piping at facility
PAULSDN.W A Operating Reactors Branch 5 90/06/36 3p p
B00703Q316 Submits schedule for mods to improwo tea tab 1 1 1 ty of plant
syc as committed to in 78112? request for partial e Hemp tlon
from codo requirements instrument air/n 1 trogon ay* !<
demlnoraliied water sus mods completed
F1NFROCK. I R Jersey Contral Pouier & Light Co £!0/O6/37 Ip
8007100413 Tiicl) Sfit'c Change Jicrisip
rtpp A, re .idill Fire protection 5 i
mayor erii.1
FINFROCK, 1 R Jersey Centr.il J'
ampnii tu License DPR -I
ed flurtTiy 1 9BO
Light CD
Torh Spec rhange R^q.ueat 97 Pot- amend In License |3(iff-16,
ftpp A, re ndifl fire protection &tj« installed fluring J9E3O
refueling uutaye Consists al- i ep 1 at-oraoril Becticrii "3 ID !<
1 la
« Jersey Central Pnuer !' Linnt Co BO/07/ 14 I5pp
B0072QOO/6 Responds to E50031i! Itr to J rthearne ob jcc t ing. on behalf oP
niunera of plants under St-f revJOUito cutrtnt plJns far
equipment F D r iud r il « applicable mcjnur nnd urn *, order
DENTONpH n Office of Nuclear Deader Regulation. Director
80/07/li 4pp
2007370164 ForiuardE summiiry of results of leakage roduction program
conduiCed iluriiifl Spring 1990 nutagD.in response to NUflEG-
057B- SBCtion 3 1 6,8
F1NFHOCH. I (i JeraL'y Centrol POIUBT S< 1 ignt Co BO/07/ai 6pp
C007310O19 "Analus i <; at PopuldtionEi of Honng f, Fouling Organisms in
Vicinity of Oyster Creek Nurlff.nr (lener-ating Station,"
quaiterly rept ./tint'-Aug 1771?
HOrtQLAND. K E , CRIK.KCT.L Uchiflh Un i v FIN D-5/14 NUREO/CJ?-1207
00/07/31 ilpp
0 Inspection reports. IE GulSetins
H0070J0297 Formards JE Waste Pairing InSP Rept 1 SOOCO3V/BO-03 on
H00227-S9 No nnt>cora(i 1 iancn noted
SMITH. 0 H flDgian 1, Phi Uriel plii.3, Fuel racilitu I, Materials Safety
Branch OO/04/K1 Ip
--000/OIOJO& IE Waste Packaging Innp F?L'pt 15000OM9/EtO-Q:j on BOQ227-2V No
noncomp 1 iance noted Major areas ii>e-pncti»d shipping paper
roq.un emontb. DOT placarding req>iirempn Is. rrfd mti oin levels,
removable cnnt emirifit ion & Diturrtal piitiiojB fentureE
PEEHV.W W , PDTTl£R-,l P Heoion 1, Pn i ladelpti ia, Fuel Facility *<
Materials Safttij Branch QO/01/1B 7»p
6007070113 Foruardi responses to questions rai&ed at 000630 roea-fcing re
NRC evaluation of tiuo possible tracts in core spray piping
Also forwards suppl to util 800637 evaluation
BARTNOFF, B Jersey Contral Power J. Light CD BO/O7/03 6pp
8007220031) Forwards 1C Insp Rept 50-J19/aa-10 on G00317-2Q !. noticr of
violation
DRUNNEf?! E J Region 1. Philadelphia. Reactor Operations Nuclear
Support Dranch FJO/01/09 Sto
8007180113 Notifies that 790921 t. 1001 route approval request for spout
fuel shipment is subj to license fee Review of* i-equBita uai
completed on 800416
HIULER.W 0 License Fee Management Branch BQ/Q7/03 Ip
8007250716 Forwards NRC evaluation of SEP Topic* 111-10 A.V-ll A,
vI-7 C 1.VI1I-3 D (, VIlI-'l Evaluation uiill bo input to
nfety assessmunt unless changoa neeifcd to reJleet nB~hutlt
conditions
CnUTCHFIELD.D Dperatlnfl Reactors Dranch 5 BO/07/03 23pp
H007I60SOO FDrmards response to NRC 800507 Itr ro oddl TM1-9
requirDments per NUREG-0660 Qenerally agree* w/OE BOOOS1
ganeric BUR responses QueatioHB 3 ti 7 cannot be nnsiupfed due
to insufficient supporting documentation
FINFROCKi 1 R Jersey Central Power !< Light Cn 80/O7/Ofl Spp
B00723Oci9t Discusses cract In emnrnency con- sprag piping Agree) w/plan
to complete quantitative evaluation on t oui-low- IDUI wotHr
iBvel by BOOS01 t. provide for possible replacement of
reducers Operation fur ono fuel cycle permisai ble
CRUTCHFIELD, D M Operating Reactors Branch 3 00/07/09 3pp
B0073I051? Summary of 000630 meeting m/util ro vlaujl indicatlqns of
passible cracks in plant core spray i>ys
PAULSON, M A Operating Reactors Branch 3 80/07/09 lapp
B0072B0720 Forwards NRC current evaluation of SEP Topic I1I-B B &
request for addl info re pipe break outside containment
CRUTCHFIELDi D Operating Reactors Dranch 9 BO/07/10 30pp
B007170279 Responds to NRC BOOill Itr !. foruinrds addl info ft failure
of control rod to fully ineert on icram signal
FINFfiOCK, 1 Jersey Central Power S. Light Co SO/O7/14 2pp
B0071B0409 ForiuardE Tech Spec Change Request 07 for amend to License
DPR-16,App A, re add] fire proc tec tion syjs installed durlro
'19HO rafueUng outage Class III amend fee oncl
FINFHOCK, I R Jersey Central Power ". Light Co SO/Q7/14 Ip
— B00723OO5H Notice of violation from insp on (100317-20
* Region 1, Philadelphia, tlffim [if the Dircctoi BO/O3/06 Ip
— 8007530060 IE Insp Rept DO-Plf/gO- 10 on 80031 /-HO Moncnmpl i ance noted
failure to implement inGervire testing program It procedures
per Toch Spec k O
nCKITOiW A Region 1, Ph i lail alr'i I a- Office of the Director
CAPHTGN. D (- Floy ion 1, Philadelphia. Ftc.ictnr tlpeiations Nuclujr
Support Branch tJO/03/06 9pp
9007140445 Forwards IE Bulletin BQ-I3, 'TrackinD in Core Spray
Spargers " Written response required
OniER'B M Reqion I, Pli i Idtrie 1 ph i -t. (JTPicc nf tlic Dirertor
BO/05/12 Ip
3007030163 Forwards IF [nfo Notite 30-23, "Brnnkdomtis In Contamination
Control Progroms " Nn luritten rpapisnee r<?n.uirptt
GRIEP,,G H Region I, Philadelphia. Qlfi.fi> of tft p Diroctor
BO/Q9/2S Ip
9007170633 ForujardB IE Insp Rep t 3O- ^19/Rt» -1U nn R(104t)7-ll No
noncompl iance nott'd
DRUMMER, E J Region 1, Phi 1 ndelfili i a, Reactor (Inerniiano Nuclenr-
Support Di-anch SD/OWaa 2pp
— B0071/0672 IE Inep Rept 90-219/HO-l^ on 000107-11 Nn noncomp ) ianc e
noted hninr araa'i inspected OA/OC administration' do-sign
changes/moils tv fulJiiuup (,n ptevinusiy ulentiFiod itcmt.
NAPUOAjfl . CDNWAVi J Region 1, Plu lad D J phia, flPfice of the
Director ORECNNftN, C Q Roijion 1, Hli i ladi Iphia. Reactor
Oper-ttlpna Nuclear Support Branch OO/Q5/D3 9pn
BOO701031B Foriuards IE Info Notice SO-21. "loss o (- t.uction to rmergBncij
Feediuater Pump5 " No uiritlen resflnnac rpquirod
DRIER. D H Region 1. Philadelphia, (Iffico of UP Dirsctor
BO/05/2? Ip
DOCKETED ITEMS
rtddl response to FOIA request for records concerning Hittman
!< envelopment Corp. HAD EvtE. Inc ?. Radiation Mat
jiarfls balance of documents 4143 page-s) listed in
M Division o-P Rulfrs anil Records BO-/O6/02 3pp
— 0007130451 Desponds to NHC BOOS09 Itr re violations noted in IE Insp
ftept 5Q-217/BO-10 Corrective actions imp lementati on of
insorvice map program delayed due to personnel & recruiting
problems Fstimated completion 801126
H03B, D A Jersey Central Pouer * Light Co GO/O6/03 2pp
'26ft DlaciiB5?5 IE Insp Kept SQ-21 9/75-U1 on 75IO31-11O9 t.
rda notice nf violation
N,P ri Flegion 1. Philadelphia. fuel Facility *' Materials
il Branch 76/O1/Q2 Epp
271 Notice of Violation from insp on 751O31-II05 Woncdfflp 1 lance
failure to notify NFIC at possession of byproduct matl
ling NHC Furm S4 1 within 3 days prior to engagina
-iv] ty
Sion 1, Ph i ladsJph is. Fuel Facility I, Materials SaPety Branch
1 /02 1 p
27fa A<li receipt of 7&D137 Itr informing NRC oP steps ta I en to
i-t violation noted in IE inEp on 751031-1105 Also ack
pt of NRC Form 211, "Rent of Prop-os-nd Activities in
reement State* "
J.P n Region 1. Philadelphia, Fu?l FaciEity !. Materials
J Branch 7A/Q3/Q-2 ip
236 Informs NRC of s.teps taken to correct violation noted in IE
Rept 50-319/79-01 on 751031-1105 Corrective actions
-late personnel have open advised to file NflC Form 5fll
nutine svc fa in nonagreement states
P T Hittman Nuclear & Development Corp Isubs Hittman
I 7A/O1/37 3p|>
• Acts receipt nf SOO-EII1? 1 fcr responding to NRC request For
t i an of ieveral commitments Cased or. S0053B telcon,
»r stand* that environ air samples discussed in Itr
n ralibr iiBing approved procedures
H Rug ion ], Philadelphia. flFPice op tlie Director
. Ip
000716069-9 forioarifs IE Circular 60-14. "Radioactive Contamination oF
Plant Demineral i icd Water Sys t< Resultant Internal
Contamination of Personnel " No mritten response required
QFIIER.D H Region 1. PJii ladelph la. Office of the Director
80/06/24 Ip
8007210193 Foruards IE Info Notice 8O-24. "Loiu Level fifldwaste Burial
Criteria " No written response required
QFIIEffiB H Region 1. Phi ladol ph ia. Office of the Director
HO/Oi/25 Ip
B007020377 Forwards roaponse to IE Dulletin SO-13, "Cracking in Core
Spray Spaisers " Rept encl
FINFROCHi 1 Ft Jersey Central Power t, Light Co 80/06/3? 17pp
8007230122 poniards 1C Dulletin SO-14, "Potential Misapplication of
RosDmount Inc Modt'ls 1151 & 1 1 53 Pressure Transmitters
U/Either /i or D Output Codes " Written response reciUired
IE Circular QO-16 also oncl No luritton response required
ORIEH.B H Rogion 1, Philadelphia, Office of the Director
80/00/27 2pp
B0072100'12 RespondE to IE Bulletin BO- 10 Required actions completed &
results are on file at faci 1 i tuji a vai Ish le for review
FINFROCW, I R Jersey Central Pouier (. Lieht Co BO/07/01 Ip
SO 070 90S 59 Updates HOO&27 Itr re evaluation of possible cracks on
segments of cnre spray piping within reactor vessel between
inlet nonte L ve&sel shroud Enc 1 replacement pages discuss
cyclic streGses induced by loin level dynamic inputs
. I B Jer-aey Central Power t. Light Co 00/07/07 ipp
Forwards IE InFo Notice BO-26. "Evaluation of Contractor
ams " No written response required
H Region 1. Philadelphia. Office oP the Director
IP
For war i!s &i le-spec i Fi c I. neneric nuestinns re GE disc
indications per BOO 109 meeting !. It Info Notice
Hestlnghoine I ois pressure turbines -disc cracJis
requested within 30 days W/o encl
ELD.D Ujieratin-s ffeactors Branch 5 SO/Dfi/1 I 5p
Forwards IE Dullatin BO-14. "Degrddation of BUR Scram
e Vol Capability " Written response req.ulred
H Region 1, Philadelphia. Offica at the Director
B007250170 Foruards reply to IE Qulletln 00-08 re containment liner
penetration uields Response ta Action Items 1 through 3 fc 2b
t> 2c encl Addl ueld info to be provided within 45 doye
RDS3, II A Jersey Central Power t, Liijht Co 00/07/07 7pp
800/330305 Foruards reply to IE Bulletin SO-ll re masonry uall design
List of masDnrn ualls b re-evaluation priority schedule
oncl No cases of safety-related piping attached to masonry
walls have been found
FINFUOCK, I R Jerasy Central Pouier (, Light CD BO/07/07 7pp
BOQ7SKI3EB Discusses IE insp nn 900318-19 !, forwards notice of
violation f< notice of proposed imposition of civil penalty
STELLO.V Office of Inspection d Enforcement. Office of the
Director BO/07/08 4(ip
Foruards IE Insp (iept 50-EI9/BO-06 on BOOE04-OB Ho
lance nutoif
.1 T Region t. Pbi ladnlph la, Ruac tor Construe tinn i
ing Eop.port Bratith (JO/O6/13 2pp
SB IE Insp Kept 3a-PlV/90-aJ> on 6OO20^-OB No noneompl lance
Hajor areas inspected activities associotEd
rvice lns|) program
AN. E P Region 1, Philadelphia, OfPice of the Director
L E fftigiun I. Phi ladslpnifl. He actor Cc-natruc tlon ti
prlrig Support Branch aO/06/11 5pp
Forwards IE Bulletin BC—15. "PosBihle Lc-sa of Emergency
tion BJB (ITNSJ H/Livss of Off^ite Pouer " Written
required
! Region 1, Philadelphia. OPPice op tho Director
IP
Respond! to IE Dulletin BO-O6, "Engineered Safatij Feature
set Controls " Mam steam isolation. containment
isolation condenser sijs will lie test si within -15
r startup from 19BO refueling outasff
Jersey Central Pnuar A Light Cn HO/04/19 App
Forojards IE Circular OO-13. "loss of Reactor Coolant Pump
Natural Circulation CooliTown " No uritten r-ospoliie
legion 1, Philadelphia. Office DP bhe Director
IP
Ack receipt nf BOOfcO-3 Itr re IE Insp Rppt 30-2I9/HO-10
vibration analysis tgi understood to be
ated Si appoarfl to eiteeiJ regulatory renuJrEsiBntB
— Q007H10S94 Notico of violation From insp on B00318-11? Noncompl ianie
noted failure- to establish radio-active uiorb permit
on 770702-0310 & Pailuro to use precautionary procedures
during control rod blade tool cleaning
* Office of Inspection It Enforcement, Office of the Director
BO/07/oa 3p p
— Q00751OS99 Notice oF propoie-d imposition of civil penalty in amount of
431,000 fnr item of noncomp 1 1 ance noted in IE insp on
BQ031B-1?
* QFPice of Inapactiort f< enforcement. Office of the Director
90/07/00 Ip
— 600721 034 J Order modifying DL Immori late 1 y. by adding Section 4 3 2 to
Tech Spec 6 3 re fatlli-ty staff qual i Picntions Request for
hearing jnaij bo submitted within 23 days
STELLD. V Office of Inspection A EnCDrcament. Office of the
Direc tor 00/07/OB 9pp
[3007340356 Confirms oral notification made on 800707 that HO-day
poriod Fnr complotinu tos-ts required by IE Bulletin 80-17,
Item 9, began at ID 01 AH en B007QS Also requests immediate
notlfira tion of any malfunction faund durinn, testa
GF1IEF1.D H Region 1. Philadelphia, Office of the Director
BO/07/09 2pp
60O72ao3E?i Ach receipt op 900317 Itr informing NRC of corrective
actions to i temi of noncofpl lance in IE Imp Rept
50-217/7-7-10 Da to (I on responses to noncomp I iance !i
discussioni (it S00431? meetingi spec i Fi ei parts arc withdrawn
STELUO.V Office of Inap-ection t. Enforcement. Offieo pf the
Director 8O/07/17 2pp
fiegio-n I.
Iph i a, Reactor Operation* Nuclear
R Periodic operating report!
related corr
ipondence
0007150705 Forwards 000606 20th quarterly progress rep t, "Wnoiltinrer
Study Associated w/Oyster Creek Generating Station." For
B00209-0310
FINFHDCKi I R Jersey ContTHl Power (. Light CD 80/07/QB Ip
— BOO7190713 Piogrocs rept for 20th quarter. "Woodborer Study Associated
ui/OyHter Creek Qetieiating Station, " for period 90O2O9-051Q
MAC1DLGK.N J . QELMQRE, C 1 , HILLHAN.R E Dattcllo Memorial
Institute, Columbus Laboratories BO/ fib/Ob 24pp
BQO70700B'} Petitinn ta amend E1G0221 LunF irmatorij orfler to allow
operation u/o i i-c 1 1 cul aK uii pump tt i (' ""til Spring 19HI
TpFuoling Diitaui? Equipment needs tii I'c iriKpei-ttd t< piEpnie-d
pi nor ta installation Delay will bo I c niiomi in I '. prartit.il
DI5E.1) P Ni.ig,dr.i Motiauk POUPT I 01 p flO/Ofa/:iO -IP*
O007L'COO'y:i Ac » receipt of B00630 petition to amend c nn P IT matorij order
Rospoiibe nil 1 1 In; Ftirutirded shortly
IPPCL1TD.T A Opui-nting Ht.itliiT'S Br.inch ,3 BO/Q7/17 2pp
H General c in r pspnndeni. t
0007330363 Forwards monthly operating rept for June 1980
RDBB, D A Jersey Central Pomer J. Light Co BO/07/IS Ip
— BQQ7220364 Monthly operating i apt for June 19SO
MCCUAIN.C M Jersey Central Pnujer !. Light Co BO/O7./1O llpp
8 Reportable occurrences. LEfls t. related correspondence
0004240821 PNO-l-BO- 37 on S003O9, 1 1 censoe scheduled matnt on iflrti
protection sys due to crarked t< leaking valve body on sys
supply haadeT Fire protection during outage ui 1 1 be supplied
by Fti>o truck connected to Number 2 fire hydrant
BHIOOS, L , KEIMIQ,R R , QRUNNER, E J Region 1, Philadelphia, Office
of bhe Director Bo/OD/07 Ip
S00707O3S9 Foruardfl LER 80-024/03L-0
FINFRQCK, I H Jornoy Central Poiuer
Light Co BO/Oi/37
Notifies i>f ihangss '.iittiin 11 1 1 1 mpt All c urr t sputll !
pur t.1 In in<j to EI>L nj i ty-relal i>U matters should tie sent ta JO
Sunser TE l.empges 1 5 vice pje»iiient in charge of nu< loar
generut i un
QARTLETT.J Niflgir.i MdhauH Puuor Cnrp C\nSOffi7 Jp
I Finontial i nf cr niiJti on
BOO72(1037» Fnruiirda i,tll rtnnunl Financial FU>p t for 1979
LEHPfita, T E Niagara Mnh.iuk t'oiunr Corp SO/07/23 Ip
P Operating licnnan et.igo doLiimentt r, Lin retpondciicfi
flOO723003B Bummai ij <,f B00207 met' I inn ui/Mark I omiiers oroipp 1 ti
Mtt, re rev i ninns tn NRC acceptance criteria '< (jut stand i ng
i asueu relative to Mark 1 containment lono-turni program
ORIMEB, C T Plant ^i|5tems Oranch 00/02/21 31pp
—8007070369 LER HO-Qal/ODL-O on OdObSO, during invBatiDafcion of
LER BO-17/1T, "one rod free travel interlock" survBillanto
requirements not performed SB required Causec by ToilurH to
perform procedure !• BCh pilule aorvei 1 Itince
ROSS. D A Jersey Central Power t< Light CD 80/06/27 3pp
BOO7O70aiil Form^rdB add! info re util commi Imente to neat NUREG-OS.'Q
Rncomroi?ndabl«T.5 a 1 Ib.H 1 BFI •< (ITS vunllng Discusses
inadoqua Le curi> cnuling tlelecUun ins ti iimi>nt^t i (in (. ImpTdver)
poBt-nccidunt sampling capability
QIBE.D P Niao--"''! Mnhaut Pouoi Corn BO/Ofc/Sft 5flp
E007110370 Foruiards LER 00-032/03L-0
FINFRDCH. I R Jertmy Cnntral Power d Light Co
— B00711O373 LEU EO-023/03L-0 on 000603, reactor high presauvfr isolation
condonner initiation suiltcli trip poltiti found leas
conservative than specified Caused bij unusual avc condition
PresBUpe aultchos roaet !* exercised to ensure operation
RO3S.D A Jersey Central Power !< Light Co GO/O7/0 1 3pp
end t» Licence [|pn--ii3 coni>l sting
BO07I70393 Foruiardc npplicflttnn fo
of changes to Toch Specs
THOMAB, E 0 LuCoeuf, Lamb, U'lbij i MatRaiF 30/07/16
— B00717O374 Application fur amend to Lirun&e DPR-ftfl CQn*iiting of
chanflcs l<i Tilth Fipecs ru heat treatment D* r Ire ill stirfl
water di)i
nitiE,l) P Niagara Mohuwk Power Cor|i (10/O7X10 Opfl
B00711037B Foruiardo LCR BO-OS9/OIT-0
FINFRDCK, I R Jemey Central Pquier I. Light Co
— BOO7H03B3 LEU BO-029/01T-0 on Q0061B, during surveillance test,
nonf unctioning oporator discovered in voJvea V-9-12 t* V-9-B
found leatiing Causad by component Failure Detective valves
replaced tc uill bo inspected Revised rept mill follow
ROBS, D A Jersey Central Poiuur t< Light Co BO/O7/O1 3pp
— 0007170197 Proposed thdngBfi to Tocli Specs S 0 for limiting condition!
(of operation (. i' 1 5 for h«.it tri'iitmont of circulating
water sign
» Niagara Mohawk Pnuor Corp HCVO//IO El|>p
— B007170403 "Atoussmunl of Biological Impacts uf IncrDiialng Tenp Cliange
Limitetian at Nine Mile Point Unit 1 "
» Lauilvr^, Mati.nkij t. Skellij Cnginoers HO/03/ai 27pp
8007140530 EN-BO-030 notice of violation t, proposed imposition of
civil penalties will be issued to util by BOO700 due to uttl
failure to instruct ucrkors, perform surveys nf airborne
radioactive matl l< Failure to Follou protection orocodupeH
BROCHETT.T . THDMPBON, D Office of Inapection !. Enfm-comsnt- Officl
of the Director 80/O7/03 2pp
B007230S70 Foruiards RO
CARHDLU. J T Jersey Central Power !< Light CD
— 8007330574 RD 30-21 9/SO-37-1P on B0071i, matter bldg ID Btlppresmon
chsmtar vacuum breaker sys Inlet pipe uae *ound blacked by
plastic beg Caused by pBreonnel error Plastic bag uss
removed from vacuum breaker inlet opening
CRDSBV.P J Jersey Central Power d Light Co 80/07/17 2pp
B007BS0197 PNQ-1-80-103 on B00717, pressure transient caused triple lou
watar level signal Folloued by i eactor low untsr level
• cram Cold shutdown underuai) for further analysis of
incident
KEIM10.R R , BRUNNER.C J Region 1- Philadelphia, Office of the
Director BO/07/1B 2pn
Q Inipoctioi) ruportsi IL Dulletlns £'
OOQ7I40474 ("nnuai'ils 1C DullBtin flO-13, "Crackinn In Core Spraij
SpargerE " Written roopunso vt'tiuired
CRIEti, B H noijiun 1. Philaufllilila. flFFico of the Director
flO/05/lH Ip
0007030157 Fofuiardi IE Info Nolite 30-23, "Break d ouina In Contsimin^t i on
Control Proiir.im!. " No wpittan toBponi,e ronulred
QRTEri,D H Region 1. Philiidelphim Office of the Director
HO/OS/3B Ip
BO0701O:Jlfl FOTWHI rts 1C Info flotlru (10-B1. "l-OKt of llnrtioii to Cmemfriicg
FEBduioter Piimpe " Mo written response required
OR1CR.B hi Reuluri I. Ph t Indeloh ia, Office "( thu Director
00/05/21? Iji
B007IB0073 Tor-maidt replv to IT Bulletin SO-00 re itiami nation of
containment linihr penetration UjtliK No dofifionci03
renor t&i
t-EMPOES. T C Niagara Mohauk Power fnrp flO/Ot/07 '>»!<
DOCKET 90-320 NINE MILE POINT NUCLEAR STATION. UNIT 1
0 Ad Judicatory correspondence
B007S10100 Rospor.il!, to Ib [tulletin 00 0V, "Hydrnmntpr Actu^toi
PoPlc lone 1 GE " Ni>ni> of auljj Dqnipment 111 U5B nr |i Inn nod for
us« at Cac i li t<)
tEHPOES, T F= Mlauira Mohawk I'puer Corp 30/06/09 Ip
0007310243 Forwards Commission B00327 momorandum & ordov c-otitalninj
dBCiiioni on UCS VBOS02 petition for reconsideration of
7B0413 memorandum fc order UCa 771104 pBtition sought action
re fire protection for electrical cables
EIBENHUTiD.O Division of Licensing BO/Ot/35 B9pp
B007H10SBB rorioardn 1C Info Notice UO-E6. "I: valuation of Contractor
OA Progrdiiis " Nn written tBi.porBH rpqulrcrt
ORIER.D H Re-glon I, Phil.idelpliict, flfdcp of the Dlrectov
BO/06/ 1O Ip
DOCKETED ITEMS
7170i*(i4 iftdtfl rBtponse In ((HA n^us-il For rerorda concerning Hittman
"dear t< Development tnrp.HAn five a, Inc F. Had I at ion Hg t
nrp FniUiirdB brtlnriCF op d-ut umcn li i H3 page-a) litted in
J-P
El TON, J II Division oP Hnlot jirid Record a BO/Od/oS 3pp
— 8007130431 Responds to NHC 00O909 1 tr re violations noted In IE Insp
Kept 30-21 9/BO-1O Corrective actions Imp lemontati on of
inservice Insji program delayed due to personnel tt recruiting
pr-obtoms Estimated complption SQI1S6
ROSS, D A Jersey Central Power b Light Co BO/Q6/03 3pp
)0717OSft(. IH&CutGrs IT InEp Kept 50~L'I 9/ 75-01 on 7'51031-II09 &
forwards nutiit »F violation
NFLEuM. t> (I Keg ion l> Phi I rtflB] ph i d, Ti»el Facility *. Materials
Safety Drnncll 7i/01/02 3pp
}O7I7O2/1 Notice of violation from intp on 751031-1 105 Nonccmp 1 1 ancf
noted Fniluri1 In notifij NHC up iionr.ois i on of byproduct natl
by Filing NUT lorm ,:i 1 uiilhin I daijs prlnr to engaging
in 01 1 i vl ty
* Henlun 1, I'Mlflrtalphia, fuel Futility R Materials Safety Drancti
Ip
GO071&O699 Foriiiards. IE Circular HO- 14. "Radioactive Contamination of
Plant DEmineral i iofl M in tar BIJ £ h Resultant Internal
Contamination of Pfraonnel " No written response required
GfllER.B H Region 1, Philadelphia. Office of the Director
Ip
BO07210193 Forwards IE Info Notice B-O-Sfl, "Loui Level Raduaste Burial
Criteria " No written response required
•QftlER.B H Region I, Philadelphia, Office of the Director
60/06/25 Ip
M>7170i!76 Ac* roielpt of fbOiSl? I lr Informing WFIC of steps tak-un to
correct violation noted in IF inflp an 7S103i-llog Alao ack
rocuipt of MRC Turtn Jtli "ftvp t of Pra(ia«eil rtctivltien In
Honagrnemout States "
NEU'SnN! P R Henloii I. Pin loifo Iphin, Fuel Facility ;, Material 5
Bafe-ty Branch 76/OIJ/f)H Ip
InfoTmt NIK, oC stopB tod en to correct violation noted In IE
Insp Kept D0-ai?/7i)'01 on /OI031-I10& Corrective uctinns
apprnriato ppraonnel hove burn odvisBd to (=>!(; Wf(C Form 2-11
For routine uvct, in nonag rBDman t etiitos
WITE.f T Ilittman Nuclear t-, Di'vel n-pment Cm p l&ube Hittman
Cnrp 1 7bfQl/Sf 3pp
OIO3A5 Atk iccDipt of 1100!) IV Hi ruKporidinfl to (IRC rnqu&wt far
nf iroiatiun or aavoro] <.ammi tmuiit t ll(in*fd cin BOO3yt3 telcor>,
C ur<l ffrstflnd n th-at environ air Gjnn|ilct ijieruasri) in Itr
VD bven csllbf using approved protocturct
tKK.D H A HIT ion I, PhllflUiilpnia, flffice of the Diroetor
Ip
0007O50377 forwards response to IE DulJetln 80-13,
Bpray Spargers " Wept r?ncj
FINFROCH, 1 R Jersey -CBiilTal Power fc Light Co
"Ci-acking in Core
80/04/37 17pp
B0073301B3 Foru>ar<JB IE Bulletin BO-iA^ "Potential hliaapp 1 ication of
Rospmount Inc Model t 1151 d IIS? Pressure Transmi ttora
W/Eitlier rt or D Output Codes " Wfittnn response roquired
IE Circular BO- 1 6 alar: and Ho uritten response required
GRIEF1.H |l Region 1. PJi i lail&lph i a. Office of the Director
EJO/Oi/27, 2pp
8007210042 RBGponSs to IE Bulletin 80-10 Required actions completed Si
results are on file at t aq i 1 i ty. aval lab 1 0 for revietu
FINrffOCK. I R JarEBU Contrsl Power & Light CD 30/07/01 Ip
B007O^oa59 UpiTatee B00627 1 tr ro evaluation of possible cracks on
segments of core spray piping within reactor vessel between
Inlet no i lie t< vessel shroud Encl i eplacBWent pages discilSE
cyclic otTOinen InduEad bij loui level dynamic inputs
FINFROCK. 1 R J&rsey Contra! Pouipr Si Light Co BO/07/07 &pp
3l056fl Fonanpds JC Info Hot ten (30- 3d, "tvoluntinn of Conti-oetor
I'roorflmii " HU written reaponia required
IER.U H Poglon 1, Ph 1 lailo ]fl> la. OPPlte of the Director
Ip
8007250170 Forward B reply to IE Bulletin BO-OB ro containment liner
penetration welds ReBponno- to Action Items 1 thr-ough 3 & 2b
it 2c encl Addl weld info to toe provided uithin 49 daiju
H09B.D ft JBP9C1) Central Ptiuier tt Light Co BO/07/O7 7pp
flrd^ ni tp-Epecifii (. gun trie nuostlnns rB OC dlic
iclring 1 111! ita t ioni por PUOtO'J naolint) t, 1C Info Naticr
-157 on UoKtlnghoif** I oui pTonourw lurblne-* disc cracks
spouse rpqumted uitltln ;)0 tlayo W/n enc]
, D Opur<itin(j Itnnttoro Rrflnth 0 EJO/Oh/ll Sp
B0072303Q5 ForuarUs reply to IE Bulls'tln BO-11 i-o /naBanrij uall design
Li»t of masonry wallt fc re-evfl 1 uet i on priority Behedule
end No caaos of aafo ttf-relaterf piping attached to masonry
ualls have been found
F1HFRCJCK. I R Jflraey Central Poiuief !• Light Co BO/07/07 7pp
•1&291 loruards IE Bulletin flO-14. "D-frorndfttlon oP CHJi Scran
[Charge Vol (njioliil i ty ' Ur liters re up onto T squired
CJi-D II. lealon I, r'h i loUe l|:hi a, Office of the Director
04/12 Ip
0007210288 Discuss"* IE insp on SOO3IB-17 (, forluards notice of
violation *< notice- of propoftBd impoaitlon of civil penalty
8TEL.LQ, V OFflre a? InBpectioni «, Enforcement, Office of the
Director GO/07,/08 4pp
003S& Forwarriu It: ln«|> Dept 30-21 7/liO Of, on 000304-09 No
icornp 1 1 Anc e no toil
L60N.II T (lea I on I, •T-hllfldelptiia. Hojickor Cfinstnirtion t,
7POOaaiJ If. Intf ftffpl BO-Pl-'/ao-Oft on nooSO-l-OO No noncompllfln
nted Mnjar nruAH inep^cteiJ activltioo jin-tot Inted
/ln««-rvlr» tnkp pruu"1"™
EDNIOAM-f P Raglan 1, Phi U<U-!<iti I n. OPflc* aP the Dirifctor
R1PP.L F Itvgtiin 1. I'll I lad B I ph Irt. Reactor Construe Hun tr
noino»r»r)B 'mpport. Dranch
20697 Forwards It HullBtm 00-11. ""oBSiHi? LofrB of CmeF
ification ^JB (E-NBJ H/l-rtun nf OPfmt ti» Pouitr " Writien
|)aiifc requireit
Ft. El U nggian i. Phi lAtlmptila. afflco oP tlm Director
ip
Epond* to IE Bulletin BO-OA, "Fnoimmmnf Safety
> Rent ContrnJ* " Main »toBm I sol Jitl un» ciinto (rinant
V f< ioolnllfln conde-niBf B.IJB tul 1 1 bv teet*d ml thin t5
aPter Btartu)i Tram ilSO rufuelins ootog*
.» A Jor«,»i) rontrnl Pdwui- '< tlflhl Cr. BUA06/19 App
TE tircular B0~l[>, "I ni» of Hmetnr ConUnt Pump
rirculnLlon t-ODJdoun " Nn urlttori rc*p{)iii&
i» 1. I'hitAdolphin. nfttce tff the
• 1st of flOOAOH UP rn IF, Imp ft* pi 30-5I9/HO-1.0
>n anaiiju). 3ut undoritpod la he
ippenra to inrfti) reuulotcrij r«quirem«nti
moniti"' prnyi*li
ion i, Phi]»iipl|)hlA. Hone (or Dp*r^tion Nucl»ar
BO/Ofa/Si) ip
— H0072I0294 Notice nF vtolaticjn Prum insp on 800318-19 Noncompliance
noted Failure to establish rjufioat live work permit
on 790702-0318 tt failure to use precautionary procedures
during control rod blade tool cleaning
* Office of Inapaction & Enforcement, office at the Director
ao/07/oa app,
B007aiO29? Notice up pi-oposed: imposition of civil penalty In amount of
f 21 1 000 far item of noncomp li-ance noted In IE tnsp on
BOO310-19
« Office of Inspection d EnF-orceinent, Office of the Director
QO/07/OD !p
BQQ72HJ343 Drtfer modiFyinn OL (mmird i ately, by adding Section i 3 a to
Toch Bpec Q 3 l-B facility stflfF qualifications lieq.UB9l: for
rtaarlnq mag be submitted uithin 55 days
BTELLO.V Office of InspectiDn t, Enforcement, Office of the
Director DO/O7/08 flpp
ConFirms oral notification nade on 8007O7 that SO- day
period for romp 10 ting tests required by IE Bulletin 90-17.
Item 3. began at 12 Ol AH on BOO70B Also requests immodiate
notification aP any malfunction found durins tests
M Keaion 1. Philadelphia, OPfiee of the Director
Spp
Ac* roceipt Df SOQ317 Itr infor/nim NRC of corrective
actions to items of noncomp 1 iarce in IE Insp fiept
50-219/79-10 Based on rfrBponsoc to noncompUance E.
discussions at 900439 maetlng, spec i P> eil parts aro ui thdrauin
QTELUO.V Offica of Inspection «< En for cement, Office of the
DirectO!' 80/07/17 Sff
DOCKETED ITEMS
35
R Periodii
eports ti related c on espondonc
BOQ715O703 Foruinrris BOO606 2Oth quarterly progress rapt, "Wn a d b c r or
Study Associated u/Qyster Creek Generating Eitatinn." for
B002O9-Q5IO
FINFftCICK, I R Jersey Central Power ?. Light Co SO/07/OB Ip
--8007150712 Progress ropt For I!0th quarter, "Hoodborcr Study Associated
iB/Oi)Eter Creek Geneiating Station," for period SQ0209-051O
MACIULEK.N J . BELMORE, C I , HILLMAN, 11 E Gattello Memorial
Institute, Columbus Laborntor i e& 00/06/06 2flp(>
B00722O3i3 Forwards monthly operating rept Tor dune S98O
ROSS, D A Jersey Central Power t, Light Co BO/07/15 Ip
— 8007220364 Monthly operating rapt for June 19BO
MCCLAIN.C M Jersey Central Power & Light Co RO/O7/1O 1 Ipp
3 Reportable occurrences, LEfls & related correspondence
B00421O221 PND-I-BO-37 on B003O9, 1 i censee scheduled mslnt on fire
protection sys duo to cracked d lushing valve body on ays
supply header Fire protection during outage mill be supplied
by ftre truck connected to Number 3 fire hydrant
BRIQG5.L , KClMIS.fi n . BRUNNER.C J Region 1, Philadelphia. Office
at the Director 8Q/O3/07 Ip
9007070359 forwards LLR BO-024/O3L-0
FINFdDCH, I R Jersey Central Poiuer & Light Co
8007O700G9 Petit i an to amend B00231 ttinf i i-matonj order to allow
operation LJ/O i ec ir cilia t ion pump trifj until Spring 17B1
refueling outage Equipment needs tn te itiipeitert ti prepared
prior to in*tallatiun Delay uill be t-c nnomi crt i '. practical
DISC. DP Niagara Mnhauik PPWPT Torp BO/Oi/^0 Apf
B0073S007T Ac k receipt of B0tifc30 petition to amend con firms lory
Response mil bu furwardoO -^hortlij
IPPOLHO.T A Hpt-rating ReacliirG ar-dnch H 80'0/yi7 3pp
H General corrr&ponduni.
3007^30^40 notifies of changes within util mgt All c err esponde
pertaining to aec. ui i ty-relot t u matters bhould be sont to JJ
Sunser TG LonipgHH 15 vice piesident in charge of nuclear
generat Ion
BAfJTLETT, J Niagara MnhauJk Power Carp 00/07/17 Ip
I Financial informs fci on
0007290375 ForuardS util Annual Financial Rupt for 1979
LEMPQES.T E Niagara Mohawk Poiupr Curp BO/07/23 Ip
P Operating license stage doiumentt 'i cm respondent H
B007B30O2B Bom mar if nf B00207 meeting u)/Miirk I owners group In Gethesda.
MD. re revisions to NHC acceptance criteria (• outstanding
IBBUOE relative to Mart I c (mtn inmont long-lurm progrjidi
QHIMEa,C T Plant Systems Branch 90/02/21 31po
— B007070365 LER BO-OP4/03L-O on BOOB20, during investigation of
LER BO-17/1T. "one rod free travel interlock" Burvei llance
requirements not performed as required Caustic by fflilura to
perform procedure i< scliodule aurveillunre
ROBSj D rt JerBou Central Power t, Liuht Co BO/O6/E7 3p p
B007O70261 Formaiiia aridl info re util coromi trnen ts to meet NUHETG-OS7B
RecomroenJat ions £ 1 3b.3 1 BB !< tiCS venting DI^CUSBBS
Inadequate enrc touling ileteclion uiHtrumi>nta.t inn t. Improved
post-nccliien t a^mfiling capability
BIGE.D P Nlanflrn Mohaiuk Power Corp aO/Ofc/26 Spp
B007110370 Forwards LLR BO-032/03L-0
FINFROCH. I R Jersty Central Poiuer t. Light Co
— B00711O373 LER HO-00a/03L-O nn 800603, rnactor high pressuro isolation
condenser initiation switch trip point* fnuni) Itss
conservative than tpectfiud Caused by unusual BVC condition
PrsoBure auitchea reset & emrcisc-d to ensure opeiotion
A Jersey Central F'ouier t< Light Co PO/O7/01 3pp.
BOQ717O3M Foruards application for amend to License DPn-63 consisting
of changes to Tech Specs
THDMAS.C D LcTfouuf, Lamb, Leiby !. MacFloc BO/07/1A 3pp
—B00717O394 App 1 i coti nn for amend to Lirense DPR-fifl ccnsistlno of
changoa to Ti'ch Specs re hejt Irentmi nt of circulating
water tij 5
niSE.U P Niaaara Mohauik Power Corp 110/07/10 3pp
6007110375 roruianlE LCR UO-03D/O1T-0
FINFROCK, I R JerDoy Control Poiuor li Light Co
QO/07/01
—8007110303 LFR HO-095/01T-O on B0061B, during aurve i 1 liinco teat,
nonfunctloning operator discovered In valves V-V-12 !. V-9-0
found leaking Cauned by romponent failure tlefoctlvo valves
replaced Si uiill bo inspected Revised rcpt uill fotloiu,
R09S.D A Jernoy Central Pouior t, Light to BO/O7/O1 3pp
B007140590 CN-BO-030 notice of violation t. propo*ed imposition of
civil penal t Ion uill be tssuod to uiil by B007OE1 due to util
failure lo Instruct unrhorE. perform survey n uf airborne
radioactive matl !, failure to fulloy prntectlon procedursE
DRQCKETT. T . THOHPSONiD Office of Inspettion t, Enforcamont, Qffici
of the Director HO/O7/03 Hpp
B007230570 Forward* RO 50-319/BO-S7-1P
CARROLL. J T Jeraey Central Pnuier t< Light Co
00/07/17
--B007H30371 fia BO-319/GO-27-IP on B00716, roac tor bldg to suppression
chamber vacuum breaker sue Inlet uipe uias found blocked by
plastic boo Caused by perBonnul error Plastic bng was
removed from vacuui1) breaker inlet opening
CROSBY, P J Jersey Central Pouer t> Light Co BO/07/17 Epp
£1007290197 PNO-l-flO-102 on 000717, pressure transient caused triple law
watsr level aignal Followed by i tact or lou water level
• cram Cold shutdown uiideriuay for further analysis at
inc ident
KEIMIO, n n , BriUNNER.C J Region 1, Philadelphia. OfPlee of the
Diroctor BO/07/1H 2pp
— BO07170397 Piopifauif chaaiges to Toch Ipoci. 3 O Pot limiting conditions
for operatinn ti I! 1 5 for boat treatment of circulating
uatcr 5<ja
• Niasaro Mnhauik Power Corp 00/0//10 Bpp
— B0071701O3 "As&essmenl of Biological linpdcts of Increasing Temp Change
Limitation at Nine Mile Point Unit 1 »
* Lauler. Matueky t. SkeUij Eng lncort, [K1/O3/31 37 pp
Q Inspection reports. 1C Dullotins !i tDTBSpondonce
B00714O474 Forwards IE Bulletin 00-13. "Cracking in fore Spray
Spargers " Written rnspons« leiiuirei!
GPHEft.I) H Reaion 1. Ph i Udplpti la. Office of the Director
BO/05/1R Ip
B00703O157 Forwards IE Info Huttie UO-2S, "Breakdowns In Cnntaminatl on
Cnntrol prooraina " No lurittun renponie required
OnlCR.B H Region 1. Pli i 1 rtdel phlOr Office of the Director
BO/05/3B Ip
B007Q1O314 FDruiards IET Info Notice HO-31, "Inss of Suction to Emorijency
Foeduiflto-r Pumps " No written responae required
OIlien.Q H Region li Philoaelphifl. 0*ficp of the Director
00/05/29 Ip
0007190073 Foruarl* reply to IE Bulletin QO-OH re DJcamlnation of
containment liner penetration uelds No deficiencies
reported
LEMPOEB. T C NjogaTa Mohawk r-Dluer Corp BO/06/O7 Spp
DOCKET BO-S30 NINiT KILE POINT NUCLEAR (STATION. UNIT 1
0 Ad jud icatory correspondence
9007aiO100 ReapondB t* IK nulletin 00~OV, "llydrofnotor Actuator
Deficiqnciea " Mann of *«bj c!|ulpinenl in use- nr pt.innnd Cor
use at fac 1 1 1 tij
LEMPGCS, T E Niagora Mohaiuk I'nioer fnrp 3O/06/O9 Ip
8007310343 Forwards Commission R00327 memorandum fc ordor containins
duclsions on UCB 7B0502 petition for roconsirierat 1 on of
7B0413 memoranitum (• order UCB 771104 petition sought action
re fire protection for electrical cables
E1BENHUT.D.O Division of Li c erlslng BO/Oc./S5 B<)p p
6Q0731058S rormarijF IK Info Notice 00-Et, "TvaluetiDn of Contractor
OA Programs " No written rea(inn'ie required
onien.Q H ROHIDII 1, Phll-nlelphiri. Offitf of the Director
80/04/10 Ip
DOCKETED STEMS
t> rcqu I r cd
of the Dire
O7O2O686 Forwards IiJ Bulletin aO-L'j. 'Possible Loss Of Emergency
yb (ENS) H/LO'.s nf Offi'te Poucr " llritten
Notificat
response
SHIER, U H Reninn I. Philadelph
BQ/O6/1S lp
Office of the Di
07O30-1B9 Forwards IE Circular BO- I ">. 'La&s of Reactor Coolant Pump
Cooling V Natural Circulation Cooldoun " No written respunso
re-quired
3frIER D H Ht'ijion I. Ph I lad« lphiii> Office of the Director
30/06/20- ]p
)71ij072O Forwards IE Circular 30-14, "Rail i oac 1 1 VB Contamination of
'lant DDFUI nero 1 1 led Water ^gs !i Resultant Internal
"ontamina tion nf Perionnel " No written reiponse renuired
5H1E/!,D H Fieginn 1. Philadelphia. OFfire of -tiie Director
JO/Oi/S-l ID
721O213 Foriuardi IE Info Motite BO-SI, "Lou Level Kadiiraste Burial
ritc-ru " No written response required
!RJEft,n H Region l, Philadelphia* Office of the Director
lp
7230149 forwards IE Dulletin QD-16, "Potential Ml sappl 1 cation of
osemount Inc Models 1151 !< 11^3 Pressure Transmitters
/Either A or fl Output Codes " Written response required
E Circular EJQ-16 also enc 1 Ho written response required
NIEn,l?H Rpgion 1, Philadelphia. Office of thn Director-
Of Oh/2 f Epp-
S Beportiible oc ruirences. LEFla * related c GrreapondencE
aOO73?QQ10 PNO-J-BO-10O on DOO711, norma 1 reactor shtitdouin was conducted
to investigate internal arcing in main transformer Source op
arcing has not uot beer Ppgnd
BrtUNACKi W , KI9TER. H . UffUMNEII^E Region 1, Philadelphia, Office of
the Director HO/07/1A lp
B00729099(i Fo
LEHPGES.T E
aTda LEft QO-
Niagara Mohawlr Pouior Corp
— S007290AOO LER BO-O1 1 /04L-0 nn QOO633j recai o'er revieu shouod condenfiBr
inlet/c; irculatl ng viator discharge delta temp had exceeded
Tsch Spec limit on BQOli2Q-S3 Station load reduc ed. [ ecorder
scale expanded d Tech Spec change initiated
Niaoara Knhauili Pomcr Corp HO/07/aa 3pp
DOCHET 50-233 UN1V OF LOWELL RESEARCH
Q Inspection report!, IE Bullotina Si c orrespDiidencc
8007140028 Forwards IE Circular BO-lflt "nadloflctlvo Contamination of
Plant DeraineraH zed Water ays. R Resultant Intornal
Contamination of PerBOnno-1 " No lur'tten respanse required
ORIEft.Q M RcQian 1. Philadelphia. Office of the Director
00/06/24 lp
BO07aiQ14B Forwards IE Info Hotice OO-S-4i "Loui Level flajyaste Burial
Criteria " Ho utritten rnaponse required
CRIER, D H Region !. Philadelphia' Office of thi? Director
IB
72BO171 Forwards response to IE Dulletin HO-OB. "Elimination nf
intainmcnt Liner Penetration Uelds " No flued hosd
cnu Irak i ons uttHieil Penetiations u>ied ore- end pl^tesi
nllouB tjpe i, cartridge type
^VNE,J P Power Authoritij o< the State of Mcui Vork QO/Oi/S7
7BBOtf>3 Wospunifs to IE DulJetin HD-10-, "Cnntarririn tlnn OF
inrad loac ti vo SJB A Resulting Potential for- Unman i tared ,
^controlled Release of Rad i oat t i vi ty bo Environ "
istrument tt house svc air &ija added tu analysus progrfliti
MPOES. T E Niajara Mohauk Power- Corf BO/07/02 lp
'250173 Submits reply to IE Bulletin OJ-17 re failure of crmtrol
ids to insert Vnrtfitd scr.im discharge vol sijs man free oP
'5truc tiona
MPGES. T E Niagara Mohawl Power Corp BO/07/On 3pp
250541 Ack receipt (if B00627 1 tr tnFormina fJRC of stopo taken to
rrett violations noted in IE tnsp (lept 50-320 /(JO-0-1
UNNEH.C J Fteglon 1, Phi la-d el|ifi ia, Reactor Operations Nucloar
pport (tranch BO/O7/00 lp
073302'9B Forward, IE Insp, Hefl t 90-230/00-04 on aOOSOn-09 !. noticB of
violat i on
DHUNNEff.E J Region 1. Philadelphia. Oeactor UpprotlonB Nuclear
Support Branch UO/06/03 Kpp
07250263 Notice of violation From insp on 800903-09
- Region 1. Philadelphia, Office tf the Diroctor 30/06/03 lp
3725026-1 IE Insp Rept SO-53O/BO-04 on BOO50-ft-Q<> Noncomp 1 lane e noted
failure to document site nperalionc rflvleu committE'if
fevleius
USTEH.H D Region 1. Ph 1 1 adclph i.i. Reactor Operations Nuclear
upport Branth DflUNACKi M • HUDSOW, S D Ffegion 1, PM lautelptiia.
Jffite of the Diroctor 9O-/OA/O3 7pp
'1O119 Confirm* that 20-day period for teats in Item K of IE
lelin 00-17, "Failure op 7A of IBS Control Rods lo Fully
srt QUF ing flLrarrh at DMH, " started at 1H 01 ftM no S0070H
ucsts not 1 ficallon of malfunction ti estimated nnnpouor
ERjfl H Region l, Ph i laJe 1 phta. DfTice of the Director
07/0? Sjip
opprating report* h related correspondent <•
DOCKET 50-231 UNIU OF CALIFOHNIA RttBEflRCH REACTOR
H General c omfsponrfenco
70H6O Foriiiarda monthly operating rept fur .(UIIB 19HO
PGES, T E NiaDora Mohawk Pciuor Tnrp f10/()7/i I Spp
7t703il Monthly operating rapt For Junto I'Jfl'O
WflN, T H NidBiira Mohanik Pr>u.'pr Corp FJO/O7/U 3pp
B007090277 Advises WRC tfiat V BchTocfc IB no longer reactor
administrator "> Knp 1 an has been reactor ddmlnistrntor since
791003
Lin,T II California, Univ or. DerkelBij 80/07/03 lp
Q Inspection reports, IE Bulletins & correspondence
S007230350 Forwards IE Insp Rep t 50-224/60-03 on 000316 No
noncompl ianc e nflted
DaOK.K E Region 5, Ban Francisco, Fuel Facilitg !( MatsriaU Safety
Branch ao/0&/O9 2pp
— B007230355 IE Insp Rept SO-224/HO-02 on BOOSli No noncompliance noted
Major areaa Impacted, unplanned f>cc Idental release of
airborne radio-active matls.
VU1IAB.O P Region 3, Ban Fiancisco. Fuel Facility !. Materials
Safety Branch UENSLAWSH,!, F A , BOOK, H E Region S, San
F ranciseo. Office of the DireclaT 80/06/09 4pp
Q007E10099 Foi-wjirda IE Insp Kept 50-234/80-01 on 800906-0? No
noncompl lance noted
CREWS, J L Region 3, Ban Franc i BCD, Reactor Operations Nuclear
Support Branch EJO/06/11 3pp
— 8007210107 IE Insp Rapt 50-234/80-01 on B00306-09 No noncompliance
noteif Major areas inspacl-Dtf facilltij oroani iati on, logs (•
records S* raqiral i f 1 ca 1 1 on trainino
JOHNSON, A , CHAFFEE.A Region S, Ban Francisco, Office of the
Director FAVUKENBERUY. D Region 3, San Francisco, R«actor
Operation i Nuclear- Support Qranch 3O/06/11 3pp
D0071BOP5? Foruarilft IE Circular BO-14, "nadionc tive Contamination of
Plant Demlnerali i ad Uater Sys h Resultant Internal
ContaminatiDn of Personnel " Wo uMtten renponss required
ENOF-LKErJ, Fi H RUflon 3* San Franc into, Dffico of ths Director
BO/ 06/24 |j>
DOCKET 50-2S9 HP f CRITICAL EXPERIMENT
0 Inspection rcipurts, IE Bulletins & corrvtpondonce
BOO7I60BQ9 Foruaros IE Circular BO-14j "Radioactive Contamination of
Plant Deminnral i led Hater- Eiys !< RDBulfcant Internal
Contaminati-on ti P Peraonnel " No written response required
H Rpglan 1, Phi lade'lph iaf Office of the Director
lp
37
B00731Q13B Forwards IE Info Notice 90-24, "Lou Level Rndiuasto Curia]
Criteria " No written response required
GRIER.B H Region 1. Philadelphia, Office of the Director
60/06/25 Ip
8007010116 forwards Final rule published in B00509 Fll amending
lOCFR'iO 71 t:i roquire periodic updating of FBARs Compliance
is not required until completion of 5FP
CHUTCHF1ELD. D Operating Re.-utors Branch 5 BO/06/10 5pp
DOCKET 50-323 AEHOTEST RADIOQRAPHV t. RESEARCH REACTOR
Q Inapection reports, IE Bulletins t< correspondence
8O071O0272 Forwards IE Circular BO-14, "Radioactive Contain* nation of
Plant Deminersl i ind Water Sy s & Resultant Internal
Contamination of Personnel " No written response required
ENGELKEN.R H Region 3. Ban Francisco, Office of the Director
BO/Oi/H4 I p
DOCKET 30-236 LOCKHEED AIRCRAFT CORP
F Security, medical, emergency J, fire protection plans
8O0710Q1Z3 Requests addl time for completion of work re firo brigade
medical evaluation program Completion date of B01031
established
MAYER, L 0 Northern States Pouer Co HQ/Oi/27 Ip
BO0703Oiafa Requests cnoporstiun in MRC study of p
problems in nuclear industry
CRUTCHF1ELD. D M Operating Reactors Branch 3
?oplo -related security
JO/04/11 3pp
EU07mOOt2 forwards NRC Bvalti.it ion nf SEP topic V-i re F?CPD leakage
detection Requests info concerning util as-built facility
differing frorn litensing basis assumed in assessment
CRUTCIHFIELD. D H Operating Reactors Branch 5 BO/06/12 5pp
BOG701O217 Forwards URL evaluation nf SEP Topic VIII-4 re electrical
penetrations of reactor containment Requests info concerning
util as-built facility differing from licensing basis
assumed1 in assessment
CRuTCHFlELD, D M Operating Reactors Branch S BO/Oi/12 lOpp
HOO7O10272 Fcruards evaluation of SEP Topic V-I2 A re uia tor purity oP
BUR primary coolant Review completed !. resulting evaluation
Mill form input to integrated safety assessment unlpss
changes are needed to reflect as-built conditions
CHUTCHFIELD. D Operating Reactors Branch 5 BO/ 06/13 3j)p
DOCKET 80-237 DRESDEN NUCLEAR POWER STATION. UNIT 2
p Security, medical, emergency & firo protection plans
8007Q10347 Forwards safeguards rontingency plan amend Plan withheld
(raf 10CFRH 770)
PEOPLEBiD L Commonwealth Edison Co 00/06/27 Ip
B007H90562 Submits results of mini-review of safe bhutdoum analysis
No reasonable assurance that licensees flru protection uiill
allow safe shutdown of Units 2 b 3 As min. recommends
requirement for alternate shutdown ays or dedicated sijs
HALL.R E Brookhavs-n National Laboratory BO/07/09 7pp
0 Adjudlcatory corresponilenco
90O70HJO90 Fo-ruiards request fnr addl info on SEP Topic XV-16 re
radio 1 ogit a 1 consequences of small lines carrying primary
coolant outside containment Response requested within 30
•days oF receipt of 1 tr
LAINAB. 8 C Assistant Director Pur Safety Assessment BO/06/16
3pp
BOO7IOO379 Responds to 800229 Iti which eipressed opposition to ACRS
reconwnanda tion to restructure SEP Role of licensees in
program mill teipand Ltr forwarded to Commissiunors
»ENTOM, H R Dfftio nf Nuclear Reactor Regulation, Director
BO/06/ 10 4pp
— B00710O1SO Eipreases opposition to ACF19 recommendatl oni to restructure
HEP For 3GP niiincrs to perform Bdfety analysis as outlined,
cost In dollars !i manpower would incTease dramatically
GCHAFF5TALL, R SEP Ouncri, Group BO/02/37 2pp
BOO731O243 Faruiarda Commlsiion B003S7 memorandum t order containing
decisions on UCB 780908 petition for reconsideration of
780413 memorandum h order UCB 771104 petition sought action
re firn protection for electrical cables
EIBENHUT, D 0 Division of Licensinn BO/06/2 S B9pp
BO07010331 Forward* safety evaluation I* EIA re spent fuel pool mode W/o
encls
ODDDARD, R J Hearing Branch 2 GO/06/37 Ip
H Oeneral correapondence
B007300013 Respond* to 770403 1 tr re nuclear pouinr State of IL has
seven nuclear power plants Reasons for use oP nuclear power
plants in IL listed in encl eicerpt From util annual rept
Presidant 771207 statement re Kemeny Commission Rept encl
DENTDN, H R Office of Nuclear Reactor Reflulatlon. Director
P Operating license stapo documents & correspondence
roruJarfls "Loss of OffEito Power - Survey Status Rept "
Requests vlaus re caunes fj possible remedies within 130
days
CRUTCHFICLD. D M Operating Reactors' Branch 5 ED/Oi/19 2pp
— B0071A0163 "Loss of Offsito Power - qurvoy Status Rept." F?fr«UIon 1
SCHOLL.R F Systematic Evaluation ProQram Drnnch 60/06/19 9pp
BOO701OI9D Responds to SBHT concerns re control rod drive sys. lacking
seismic analysis Quad Cities 1 !c 2 seismic design of control
rod drive ays calculations performed for facility while
under const encl
JANECEK. R F Commonujcalth Ldison Co 80/06/24 4pp
— G007OIOI93 "Qund Cities 1 t< 3 Snismic Data on Control Rod Drive Sys
» Heat-tor Controls, Itic 70/07/10 SOOpp
BOO707011& Submits revised responses to NRC 770i03 Itrs re
soconil level of unilorvol tago protection for 4 kV emergency
pouier buses siipaltjing safety-related loads
JANECEK, R F Commonwealth Edison Co BO/O6/26 4pp
B0072300SB Summary of BOOH07 meeting u/Mark I owners group in Dethoada,
HDi re r»vi»iQn» to NRC acceptance criteria 6 outstandina
it »u»s relative to Hark I containment long-term program
flRlMES. C T Plant SuBtBrns Branch 00/OS/31 31PP
0007050063 Rosponds to NHC 000S15 request for addl info concarnmg
adequacy of station electric dl stributiori ays voltages
JANECCK,H F Commonwealth Edison Co HO/06/30 Ipp
SQ07S5Q35B Forwards NUREO-0617, "DHR Feedulater Noille fc Control Rod
Drive Return Line Honlf Cracking." for revieu t. comment
CRUTCHFIELD, D M Operating Reactors Branch 3 BO/06/O4 3pp
B007O100D3 Faruiards eafety evaluation & EIA supporting proposed
facility mods to increase spent fuel storage pool capacity
Final approval cannot be granted until AfiLD resolves legal
1*1UII
CRUTCHFIELD, D M Operating (it-net or 9 Branch S 80/06/05 2pp
BOQ7070345 forwards revised n-hedule (. status info for MarV I program.
Peedwator sparger replacement !< general work planned For
Quad Cities 1 outage Proceeding on priority basis in/mods
provi fling largest onfety increase marginE
FJEfcD, C t-ommonweolth Edison Co flQ/07/OS J9pp
6007230032 Forwards "Loss of Qffaitu Power - Survey Status Kept "
Fteplac.es BOO A 19 rept which omitted Table 4
CfiUTCHFIELD. D M Operating Reactors Branch 3 flO/07/OB 3pp
8007010008 Safety evaluation supporting proposed facility mods to
Increase spent fuel storage pool capacity
* Office of Nuclear Reactor Regulation, Director 8O/06/Q6
14pp.
BOO7010O11 EIA supporting proposed facility mods to increase spent fuel
itorage pool capacity
« Office of Nuclear Reactor Regulation, Director BQYO6/Q4
lOpp
— 3007330035 "Loss of Offsite Pouier - Survey Status Rept "
8CHOLU R r Plant SytUffli Kranfh <Prt> 791030) BO/07/OB lOpp
B0073I031K Responds ro (IRC request for add! info le turbine disks
Applic-ablc turbine missile analyiis wat presented n> Amend
S to Quad Citlen CP application Analysis applies to Dresden
due ta simil-arlty of general nrrarigemenb
JANECEK. (I F CnmmoniJflalth CdUon Co HO/07/13 IB
38
DOCKETED ITEMS
0007200076 Responds to BOQ31B 1 tr to J AhearnB ob ject ing , on behalf of
owners OF plants under SEP review, ta current plans for
eipeditod review of environ qualification of electnca-1
equipment Foruaidi applicable memorandum I, order
DENTON.H I) OFFice of Nuclear fleactor Regulation, Director
80/07/16 4pp
Inspection report-a, IE Bulletins !i c orr es-pand-cnc
8007110343 ForuarilB IE Bulletin BO-lDp
Spargers " Written re-Eponao required
KEPPLEH.JQ Region 3. Chicago, OfFi
racking in Core Spray
of the Director 80/O5/12
at)07O70072 Forwards IE Inap JCepts 50-O1&/BO-O9, 5Q-237/BO-UB t,
50-249/80-13 DTI BOtM07-OSD2 & notice of violation
KEPPLCR, J G Region 3. CliiLago, Office of the Director 80/O9/23
2pp
BQO707QD74 Notico of vioiation from imp DJI B004Q7-QSO2
* Region 3. Chicago. Office of the Director HO/O5VS3
2pp
— a007070QBO IE Insp Repts 50-10/80-09.50-237/80-06 (. 50-349/80-12
DTI BOQ407-O502 None orop liancce noted failure to adhere to
QA program requirements Cantaroi nated clotJitng found lying
innde -controlled contaminated area
SFeSSARp.R L , DARKER. J L , TONGUE, T M Reoion 3, Chicago. Office
n-f the Director HQ/05/23 7jin
6007030065 Forward* IE Info Notice SO-32. "Brxaliiauins in Contamination
Control Programs " No written response required
KEPPLEFI.J 0 Region 3, Chicago. Office oP the Director 80/05/33
]0070l(103(i Forwards IE Info Notice 80-33, "Lnaa OF Suction to Emergency
Feeduater Pumps " No written rosponte required
KEPPLCFI.J 0 Reg inn 3. Chicago, Office of the Director 30/05/39
)0073a013ii Forwards IE Info Notice BO-Hfa, "Evaluation of Contractor
Oft Programs " No urltlfn response required
KECPLER, JO (legion H. Chtca-go, Office of the Director QQ/0&/10
lp
30G7Q2Qfii3 Foruflrda 5 I tE-Bpec i f i c t< nenuric questions re GE dioc
•cracking indnaticns per 300I01? meetlnn i IE Info Notice
77-37 fin He i tinghouBe lou pressure turbines, disc cracks
Response requoitBrt within 'lo days
CnUTCHFIELD, D Operating Reaclars Droneh 9 HO/06/11 5p p
5007140307 Foriunrds IE Bulletin BO-11. "Degradation of DWfl Scram
Discharge Vo! Capatillltij " Hritton rcBponsc required
HEPPLER.JO Region 3. Chicago, Office of the Director BO/06/12
IP
007100001 Foriuacifi response to IE Bulletin HQH37. "Hijiiramotov Actuator
Deficiencies." No safety-related ays or compo-iont at
DreailHn 3 l> 3 us&a AH-9O or H\I-1O aeries hudramotor
PEOPLES. D L CommntiuEal th Eifison Ca flO/OA/lA 3pp
9Q07i70'13t> ForuardB IE Circular 80-11. "Radioactive Contamination of
Plant Demtncrall ted Hater Sijs !. Resultant Internal
Contamination of Personnel " No written response required
KEPPLER.J 0 Region 3. Chicago. Office of the Director 8Q/06/S4
IP
0007330389 ForLiardo IE Bulletin BO'li. "Potential HI sapp 1 ication of
Rosomount Jnc Models 1131 IT 1132 Pressure Transmitters
U/EltheT A or D Output Code! " Written response ' en.it 1 red
IE Circular BO-li also cnc 1 No uritten reaponso reciuired
KEPPLER.J (S REDion 3. Cnicago. Office of the Director QO/O6/27
IP
B0071B0003 Act receipt of 3O0613 Itr inPorming NOC of steps taken to
correct violations notsfl in IE Insp Rupta SO-010/HO-09.
51-237JBO-OB it 50-249/Ba-lS
KEPPLCR.J fl Hegion 3, Chicago, Office of tnc Director 80/07/01
— B0071BOOI& Heapands to NRC 800333 Itr re violations noted in IE Inap
ReptB SO-010/BO-O7, SO-237/BO-OB t< 30-349/BO-13 Corrective
actions improved mcjt controls uere implemented Radiation
protection training classes uterc held for contractors
HEED, C Comttonueattti Ed in an Co 90/06/13 ipp
6007180909 Notifies, that time clack of Item 2 OF IE Bulletin 80-17.
"Failure of Control Bod« tu Insert During Scram at DWrti "
uill itart at 13 Ol AM on BDO7Q8 Test should be comploted
uiltliin 2O days Requests noti ficatinn of ,mal function
KEPPLER, J 0 ReoiOTi 3. Chicaaci' Offics of the Director BO/07/07
IP
8007250&41 Responds to IE Bulletin 90-10, "Cant ami nation of
Nonrai! iancti ve SUB & HfiEviltino Potential for Urimoni torod.
Uncontrolled Release of Radioactivity to Environ " Any
affected BIJB will be restricted if contaminatian found
PEOPLEa, D L Commoruealth Euieon Co 80/07/07 2pp
800729063-O Foruiarda response- to IE Bulletin BO-1S- "Maconrg Uall
Design " Requested invett i gat ion not performed at Dresden*
Unit 1 due to eitended outage Requirements will be met prior
to itartup U/o cncl
L Connnontiealth Edison Co BO/07/07 Spp
BOQ72S0638 Forward* respond* to IE Bulletin BO-08. "Examination of
Containment Liner Penetration Welds " Dresdon Unit 1 desions
uilll b>u mvieuiDd ^ feasibility of performing radlographlc
eiaminations uill lie assessed before -unit returned to svc
PEOPLES, D L Commonwealth Edison Co BO/O7/09 7pp
8007160630 Responds to IE Bulletin 80-17 re results of tests required
hu. Item 1 No significant amount of water in scram discharge '
vols Vent (. drain lines also vorified fme of obstructions
by performirB dynamic air teat
F Comnnonuiealth Edison Co BO/07/10 2pp
9007300195 Responds to l£ Dulletin 79-14. "Seismic Analysis far As-
Built Safety-Rela ted Piping Sys." by forwarding "Procedure
for Review 8< Resolutiiin of As-Built Deviation!" t< "Procedure
for Application of nlume Curves Criteria "
JANFCEK.R F Cpmmonwealth Edison Co BO/07/16 lp
007030037 Forwards 1C Bulletin BO-13. "Possible* Loss af Emergency
Notification Sij-9 (ENS) U/L-ana af OFFsitfr Pounr " Written
response roqulr«d
KEPFLCH..J 0 Region 3< Chicago. Office of the Director BO/06/ IB
Ip
007230371 Forwards IE lr*sp Rcpt* SO-010/B-O-IO. SO-P37/ao-09 &
50-249/90-13 on 600305-3<7 !. nottco nf violation
HEIEIIHAN.R F Region 3. Chicago. Reactor Operations Nuclear Support
Branch BO /OB/ If 3ft
-3007530379 NatUe of violation fram insp on 800303-3?
« Raglan 3. Chicago. Office of tfin Director 30/06/19 lp
OIO/HO-1Q, SO-337/HO-Q9 A 30-349/80-13 on
t«d failur-E to report events in
••dinn 3. CJiicogo, OFflce of the
or Coiilant Pump
response
tor 80/Ot/BO
— 800730049Q "EnDinoerinfl Criteria/Procedure for Review d Resolution of
rts-Built Deviations." Revision a
SNVDER.T K EDS NutUan Ire 80/O3/07 lipp
— 0007300508 "Eng ineor ing Criteria Procedure for Application of Blume
Curves Crlter-ia "
8NVDER.T W GD3 Nucleafj Inc BO/03/07 2Qpp
— 5007300506 "EnginBUrtng Cr-itcria Procedure for Application of Blums
Curves Criteria "
SNYDER, T !<., EDS Nuc 1 ffar, Inc HO/O3/07 30pp
R Perladlc operating reportu h related cnrrespondence
8007180333 ForuiarJs monthly operating repts for dune 19BO
9TEPHENSON. B B Cominonuealth Edison Co 80/07/09 lp
— 90071B0336 Monthly operating rttpt* for June 19BO
CIEBIJEWIC2, S Commo'iiiieBl-th Edison Co 80/07/02 23pp
3 Reportable occurrences. LERs & related correspondence
8007010497 roruiards LER aO-Oaa/OlT-0
BTEPHENSDN, D D Cownonnioal th Ediion Go BO/06/24 lp
39
— 80O7O1O303 LEH BQ-022/O1T-0 nn flQQM 1 , found that cpntrol ro<! driveline
• cram discharge piping did not meet FBAR seismic
rvquirenients Caused bg diaign deficiency New correct
seismic supports am being designed
* Commonwealth Edison CD OO/Oi/24 2pp
00073000^0 Ach receipt of 791210 itr transmitting changes to security
plan Second change IB not consistent u/provisl OTIS of
1OCFRSO 541 p) Add] info end End k ret Itr withheld
lr«f 1QCFR3 790)
CtlUTCHFIELn, D M Operating Reactors Branch 5 SO/O7/17 3pp
BOO7O1O344 ForuariiB LER aO-OW/03L-0
STEPHEN3ON, D B Commonwealth Edison Co
— SOQ7O1Q331 LER BO-019/O3L-O on S003SB, at steady state power operation, C
main steam lino rad monitor tripped Caused bij electronic
component failurn Assembly replaced
B ADR AH, 3 Commonwealth Edition Co BO/06/24 lp
BQO7310J50 Submits security plan info, per NUC 800717 Itr Info withheld
(ref 10CFR2 790)
HHITE.L 0 Rochester Oas & Electric Corp BO/O7/24 3pp
9007310370 forwards security contingency plan Plan withheld
frnf 10CFH2 790)
WHITE. L D Rochester Gas t. Electric Corp 90/07/24 [p
B0071OQ179 Forwards LEB BO-Q21 /03L-0
8TEPHEN80N, B, B Commonweal th Edison Co
'8OO71OO1B9 LER BO-021/Q3L-0 on BQO£>O7, during normal oper-ati an, uh i 1 e
performing dryiiiBl 1-torus pumpback dp instrument surveillance
dt-gual 1-to-tnTUB d|i dropped belou 1 psl for 2-hr Cause not
stated Personnel informed of requirement re dp
MADFIDU.R Commonwealth Edison Co BO/07/02 lp
B0071OO1S7 Forward* LER BO- 030/03L-0
BTEPHeNSON, B H Commonwealth Edison Co
BO/07/02 lp
— BOO71OQ192 LER BQ-020/Q3L-0 on H0060S, during surveillance DOB 1600-9,
toruB-to-drijuell vacuum breaker 3-1&01-3HD Failed to ffive
radundant opitn indication Canned by stuck switch Bracket was
tightened Si DOB 1600-9 was repeated successfully
OUNBAR.J Commonwealth Edison Co 80/07/02 2pp
8007Ka05S7 Forward. LER OO-023/03L-0
BTEPHEN60N, B B Commonwealth Edison CD
0 Adjudicatory correspondent
SOO73 10343 Forwards Comfnioaion S00537 rnemorantfum i. order containing
dBcisiuns on UCS 7BDS02 petition tar reconsideration of
7BO413 memorandum d order UCS 7711O4 petition sought action
re fire protoction for electrical cables
EIEENHUT.D 0 Division of Licensing aO/06/2S 89pp
P Qjiffrating license stage documant! S, correspond ence
B0070 10124 Foruards final rule published in BOO 5 09 FR amending
1OCFR50 71 tn renuire periodic updating of FSAR& ConnpliancB
Is not required until completion of SEP
CFUJTCHFJELD, D Operating Reactors Branch 9 BO/0&/10 Spp
BOO7330O99 Requests submlttal of propD'sed Tech Spec changes providing
for redundancy in decay heat removal capability in all modes
at operation Model Tech Specs which mnuld provide acceptable
resolution end for guidance
EISENHUr.D 0 Division of Licensing BO/06/11 62pp
— BOG722Q572 LER BD-OB3/03L-0 on GOOH2B, during attempt to vent torus,
valves AO-2-16Q1-60 l> -il failed to open Caused by lags of
Instrument air to air operated valves rtir supply valvod back
in tt valves demonstrated operable
rlA(H)OU,R Commonwealth Ed la on Co GO/07/14 Spp
BO0723O339 LED 80-009 has been cancelled,
COLLINS, M Commonwealth Edison Co, BO/07/23
a 007 H 0623 Forwards Amend 33 to License DPR-1B, safety evaluation 1
notice of issuance tt availability
CHUTCHFIELD, D Operating Reactors Branch 5 BO/OA/13 2pp
— SOD7140fi30 Amenil 33 to License DPR-I8, approving BDcontfary water
tfiemistry monitoring program Implemontati on EFfective on
BQQ630
CRUTCHFICLD, D Operating Reactors Branch 5 80706/13 2pp
DOCKET 30-243 OREGON STATE UNIV RESEARCH REACTOR
P Operating license stage documents & correspondence
8O071!XM>49 AdvI»Bi of procedural inadequacy re radiography of
unau-thort i«d eiplnslva matl on B 00626 Caused by inadequacy
in applying administrative or procedural controls Separate
cover sheet indicating approved mat Is will be issued,
HANO,C. H Oregon 8tat« Univ BO/07/11 4pp
Q Inspection reports, IE Bulletins t> correspondence
8007160247 Forwards IE Circular BO-14, "Radioactive Contamination of
Plant DBttiineralited Ha tor By« & Resultant Internal
Contamination of Personnel " No written response required
ENOELKEN.R H Region 5, San Francisco, Office of the Director
BO/O6/S4 lp
B007S4O3A1 Forwards IE Insp Repts 30-106/BO-OS, SO-243/HO-03 &
7O-0971/BO-01 on B00630-0701 No noncomp 1 lanee noted Ends
Withheld <ref 10CFR2 770)
NORDERHMJO. L H Region 3, Ban Francisco, Safeguard* Hrancn.
80/07/14 2pp
DOCKET 30-244 ROBERT EMMET OINNA WICLCAR PLANT. UNIT 1
F Security, medical, emorgsncy & flro protection plant
8007110129 Notification of 600405 meeting u/utll in Bethe«da, MD to
riifl«uas firo protection plans
HOMICKI.B J Operating Reactor* Dranch 5 SO/Oi/OS Spp
BO071OO2M Summary of D00605 meeting w/util in Detlnada-Md re proposed
rule concerning fire protection program For nuclear pouer
plantn operating prior to 790101,
NQMICKIiS J, Oparatinfl Reactors Dranch a 8O/06/B4 llpp
8007O7034B 8ummarii»> OHuert & As«otiatasi Inc otudy re active b
pBBftive ays to control firei in areas of exposed structural
it*eli in reiponse to NRC 7*70214 fire protection safety
•valuation, Item 33 B
HHITE.L D Rochester Oat i< Electric Corp HO/06/30 App
— BO-071 10632 Safety evaluation supporting Amend 33 to Lice-nsa DPR-1S
* Operating Reactors Branch S BO/06/13 2pp
— 8007140(j3i Notice of issuance !< availability of Amend 33 to License
QPR-lFt
CRUTCHF1ELD, D Operating Reactors Branch 3 80/06/13 3p.p
6007100399 Responds to B00339 Itr uhich eipressed opposition to ACHS
recommendation to restructure SEP Role of licensees In
program uill oipand Ltr forwarded to Commissioner*
DENTON.H R Office of Nuclear Raactor Regulation. Director
QD/06/1B tpp
— QOO71004SO Eipresses apposition to ACRS recommendation to restructure
SEP For SEP owners to perform safety analysis as outlined,
coat In dollars t< manpower uould increase dramatically
aCHrtFFBTALL, R BEP Ouiners Group BQ/02/E9 3pp
B0072B0107 Foruiardi "SCP Review of Pipe Break Qutoiile Containment, Topic
1II-3 0, for Oinna Nuclear Power Plant " t five staff
positions Requsts aitdl info to complete review
CHUTCHF1ELD.D Operatinfl Reactors Branch 3 SO/Oii/24 3pp
— 80072B0113 "SEP Review of Pipe Dreak Outside Conta inment, Top ic II 1-3 I
for Oinna Nuclear Power Plant "
» Operating Reactors Branch 5 30/06/34 36pp
BOO7240069 Requeata oddl info to continue review of SEP Topic V1I1-1.A,
"Isolation of Reactor Protection 3ys From Nonsafety 9ysf
Including Qualification 10 Isolation Devices "
CRUTCHFIELD, D H Operating Reactors Branch 5 80/06/SS 3fp
BO070S0272 Comments on NRC requirement re installation of reactor
yeasel water level Instrument at facility Requirement IK
unreasonable due to amount of development work npcettary to
implement relialile venscl level instrument
WHITE, L D Rochester Oas J. Electric Corp 90/07/03 3pp
BOO? 2 BO 00 1 Requests submlttal of application for amend to license
consisting of Tech Spec changes i< license conditions PWR
Model Tech Specs b Model license conditions for THI-3
Lessons Learned Category A items end for guidance
EI8ENHUT, D 0 Division of Licensing BO/07/03 69pp
DOCKETED ITEMS
71B0109 NBtlti.. th.t tlQOaOB r*D1JBSt Par route approval
h lament ft oF mixed o.ide fuel rode to Ginn* Staf"» i= •
1L1.ER.W (1 License Tec Management Branch BO/O7/&3
753(1057 RMpmid. to utll 000200 rDIlu«sl for
ipmant5 aP m|,.<| o«ld. Fuel T0ds R.VI.W OF
"^'^ "">' tfl »* = •«•• f** och.tii
0 I Uer.se Fee Management Br-ancJi
. ln 1QCFR1VO
BG/Q7/Q3 Jp
7210114 rwuwrds evalustion Qf actions tater, to Latfsfu Cat^noru A
tom of NflC rftdrnmendattono result, ng fro*™ TMI-a Uaacns
sarnBd reco-minonifatlons CatOQory ft iiema have been
atiBfactorlly mot w/e»t:eption of Items a a I b ft a I 3 b
WTCMFIFLO. D M (3(iBrotihg rleactors Branch 3 BO/O7/O7 llpp
'IB0357 nosponile to OOO/03 inquiry re procoss uherebij rfraft
/oluatlon performed by franklin Inst t, cantaininj posslfilg
-Dprlutanj info coulil be rt?l eased to Rocheitor &as &,
ectric Hostlnghoutm Jian proprietary a-greemetit w/u
ESEMANN.R ft Ho iUn3h<JU*B EJpctrlc f^fp BQ/07/07
Ip
'3DOI3S FpruarJ* NfiC rBvlow np eantroi roa oulflB thimbln wear In
IFIa Darned un rovi ITUI, issue IB resnlved for 14(14 fuij]
isumblloa dnelgned bij Meat in-shoust
UTCuneUB.D M Oporatlna no-actor* nraneh s BO/07/IO 4pn
320403 Forwards roipante to NRC 771032 1 tr rsquestinff addl ,nfo rt
itliarn fffoduuitiiT a«a Plotu raquiramBntf Response to
auest Par info re evaluation of aunlliary PeeduMter auB
q^ulremfnt* uaa pmvlilBiJ 791 las
ITEf|. D Dochoslur Oai fe Electric Cnrp 80/07/14 14pp
07320-107 'Tux) water Hye Floiu Diagram "
+ Rochostitr On a ft Electric Corp CO/OS/go
Ip
— BOQ7a9<H<?9 IE In«p nept SO-344/BO-OS on 000431-34 No nDnconp
noted Ma jcn areas inspected security plani security program
audi t, protected area phyolcal barriers & atceit central to
vital dr-BaH Details withhold (rcf 10CFR2 790)
HABDEN, H Region ], Philadelphia, Office of the Director
DEVLIN, JW flegioti 1. ph iladolphiai Safegunrdd Branch,
Ip
8007D2QG18 Respiintia to IE Bulletin 00-06. "Engtn»Br»d a«f«ty P<tatuc»
1E5F) fipteV Contyol'i " Ma tnconslstenc its warn founil batuflBh
schematics & actual itistal Inti n-na No areas uere identified
that require ">od or design change
HHITE.L D nochester flam * EJactric Corp 80/06/03 3pp
B00731O619 Forward E IE Info Notice SO-Sd- "Evaluation of Corltracfeor
DA- Programs " No uiritten resittmse requirid
CRIEC.fi II Region 1, Philadelphia, Office of the Director
ao/06/10 Ip
B007160344 Foriuni'dB IE Info Notice 50-27, "DaflradaUon of Rene tor
Coolant Pufnp Studs " Ho specific action or rmpoitio
reciuirfli)
OniER.D H Region t. PMlad alphU, Office of the Dlr»etar
ao/06/ii ip
0007O20713 Porbiards IE Bulletin BO-13. "Possible Loi» of Em«rg«ncv
NntiPication Si|s (ENSt H/LDQ5 of Offsito Power " Urltttn
i-Bspons* roqu'rad
ORIEFlrB K Runion I, Philadelphia. Office of the Director,
Ip
9007O204B7 Faruiards IE Circular BQ-15, "Lois of Reactor Coollnt PUnp
CaaLing b Natural Circulation Coaldcun " No written ratpon**
required
GRIER, n H Rug ion 1, Philadelphia. Office of the Dir»ctor.
BO/D&/EO Ip
200074 FfoBponifs to H003IO I tr to J Ahuarnn obj BCt.no- on behalf of
nor* of plants un«Br SCr revioWito current plans for
puilUeil review at environ cjuaHf icntian of olflctrical
ulpmont Foruardi npplitabl® mcmura n't urn * ordflir
JTONrll R Office of Nuclear Reactor Regulation. Director
4pp
B007160747 Foruiai-Bs 1C Circular BO-14, "fiadioactiv* C on t«mi nation of
Plant Dgmineraliied Mater Sijs t, Flesultant Intsmal
Contaminatiun of PersannBl " No written reaponn required
DRIER, B H Region 1, Phllndolph is. Office of the Director
BO/ 06/2 4 Ip
rwardt comments on N/iC aBsotsment of SEP Topic Vlu-4
t>g CL ZlBmnnn EJOO324 1 tr Msoi forwards reiaponse*
a-tfrfj questions raitta 6g review OvfcrniJB dr>aw(nffs
nilolfle in Control rilua only
ITE,U 1) RoctnnLor flas & E let trie Corp BO/07/ai S9pp
rttfvltuit that rfo-slgni crJitarla lor seismic upgrade program.
nnilt tod fur fJOD/lnuill ba Jalauod until BOOQID Delay
1 not irnpict «iil>mi t tal qf iinalysiu jia c Sro-g ff a on schedul?
seribHd in 300330 Hr
ITE.L D norli*»ter Oat 5. Electric Corp 00/07/24 Ip
i«j»»elion
IE Dulletlna b corr
120134 Poruar-dB 1C Info Notice BO-S3. "Oraalidauiiia In Contamination
itrol ProflTaffiM " Ho wrlttsn -response rotuired
Efl.B fl Rigion 1. Philadelphia. Office at thu Director
'03/28 Ip
Forwards IF Info Matice BO-a3P "Uais of Suction to
fdwnt'r Ptmipg " No urltten rcapnnsa required
EH,B H finglori 1, Phll0d«l|)hlR. OPficfr of tha Director
09/2? Ill
101S7 Porward* 1C Insp HBpt
compl lane* nateil
NNen.E J liijinn IP PliUadc
port Branch 00/05/3'? 3pp
3Q-Hfl4/BO-03 on 600421-25 Ho
lfidie- flssctar Operation* Nuc
IE ln«p Rept gO-H44/BO-03 on 000131-23 Mo noncorapl ianc
otad, Major art as. (n»poct»d refuolinB & outage actlvltia*
ncludlnij prejiflrati ons for refueling ti previous tnsp
init»nos
OKNSON.DF H»9ion 1, PMladeiphla* Q*Clee of the Director
(DTen.H D F1«9lo» 1> Pht Iddfflfihia, Reactor Dpuration* Mvitleav
opport Branch BO/09/S7 3pp
Poru«riJ» IE Imp Rept 30-244/80-05 on BQO421-S4 Mo
e QiniiHaivc a noted
TIN. WO ftesi»ari 1. Phil an el ph I*' Baf aguArilB Dranch 80/05/30
8007190141 Submits reply to IE Bulletin 80-10 r« contamination of
nnnradioac tivs sys h potential Par release Baaed upon reviau
of Bijs.no addl sampling or monitnrJns program need b*
HHITE.L D Rocheeter
«. Electric Corp BO/06/B4 Zpp
aOO73102Sfc roruiards IE Info Notice 80-24, "Lou Level Raduast* Burial
Criteria " No ujrltton response reqDiT&fl,
GRIER, B K Region i, Phi ladolptita. Office of th* Director
80/0 fa/23 Ip
6007230005 Ack receipt OP BO0333 1 tr informino NRG of »tep* taken to
correct violations not»d In IE Insp Rtpt SO-S44/7B-S4,
BRUNNER.E J Region 1> Philadelphia. Raactar Op er at! on* Nuelaar
Support Branch 80/O&/2& Ip
— BOO723000B Responils to HRC 790*19 Itr re violation! noted in IE In»p
Rept 50-344/73-24 Corrocttve actions «torag« room will b*
built to col* ply w/NRC Reg Quid* 1 B8
WHITE.L It Rncnester Oas & Electric Corp BO/O5/B3 3»p.
— B007230009 Ack reeflipt c.f 7909O7 Itr informing MRC of stepi taken to
correct violation* noted in IE Il"P Rept 30-2*4/78-24 BfiP
Parajraph 17 4 Is aece-ptable alternative to n*g Quid* 1 06
HAAS. HP Quality As s urBTie e Qj-orich 79/09/19, Ip,
8007230163 For ward ft IE Dulletln BO-ifc, "Potential Misapplication of
nosemount Inc KoJelt llai & lisa Pressurn Transmitter!
H/Either A OP D Output Cndes " Written response required
IE Circular BO- lib also encl No written response required,
GfiteS.B )t Region 1, Philadelphia. Office of th> Dime tor
BO/OA/37 2pp.
BOO7230490 Foriuaril* r*»ponno to Itnm* 1,3* fc 3 of IE Bulletin 80-li,
"Nasonry Hall Design " All walls surveyed except ivc bldp
which it. not gaFetij-rglatrad All walls u>ll be re-Rvaluatad
to (etermin* ddeq.uBcij to perform design function.
WHITE. L D BocJiButor Oas & Electric Curp BO/07/07 24pp.
8007380142 Foruards MtlC evaluation at Apr 1?BO steam generator imp
roBults Agrees that plant should return to pouinr after in»P
j< concurs w/propos,Dd mid— cycle insp Insp program b comment*
should bo submitted 40 day-s prior to scheduled shutdouin
CHUTCHFIEL-D, E> -Operating Reactors Brancli 8. BO/O7/QB. 4pp
R Pnriadic operating i epai ts
lated correspondence
P Operating
BOQ713Q5B4 Forwards monthly upei
SNOW, B A Roihesli'T Gab !, Cle
sting rept tor June 19BO
:trlc Corp 80/07/09 lp
--00071S03VO Monthly aperatino rept f'» JunE
rICNAMAFlA.A Rochester Ga» t. Electric Cor
BO/07/07 Sop
B HeportablH occ urrenc i"i. LERs
elated cot respondent t>
BOQ7S50946 Foruai its NU9EG-O6J7, "8MB FiPtfujal
Drive Return Line Noule Crjcting," for it
CfiUTCHFlELD, fi Operating ".p^rroii [tram h
Vmtlv !. Control
j Ft consent
BO/QJi/04 2ff
BQ07160637 RO BO-06 on 130O71 1 , ..h emi cal analysis indicated boric rtcld
(tornge tanks bcloui Tech Spi'Cc fur vol ^ percent weight
boric acid Cause not stated Orderly power reduction f.
batching operations begun to restore tanks to specs
SNOW.B A Rochester Oas !, Cloctiic Corp CiO/07/1] Ip
B007210143 HO BO-Ot on 00O7I 4, chomi ca) analysis indicated boric acid
storage tanks out of tpoc For vol !i 'i. weight of boric add
Caused by inadvertent dilution of concentration detei ml ning
chemical roagents Tanks restored to required specs
BNOH.B A Rochester Gas t, Electric Corp BO/07/14 2pp
B007O1O130 Foruai Us final mis publialicd in BQOSO*? Ffi amending
1QCFR9CJ 7! to rpquire porodic upd.iting nf FSARs Compliance
is npt required until tumpletum oF SEP
CRUTCHriElII, l> O[.0ratinn IVp^ctorr, nranch 0 E^fJ/O^/l!} 'ipp
that alteinotc insp' ui 11 be puTf-orifPil in lieu of
Tpi 19BO rehuel i ng. far HG Couni.il SOOIO1?
rtdvis
flGMC viciia] ci
Et i 1 1 i-eguesltil
CDUNSIL.W O NorlliOdBt Nuclear Cncrgy Co (sub
Uti litics) Bii/OhftO Slip
iff Northeast
B0072B0633 Foryorda LER BO-OO&/01T-0
gHITC.L D nocheBter Qaa !< Electric Corp
—8007350639 LER (30-006/01 T-0 on SOO'l 1. during routine Bnalysis of boric
acid tank samp lesi cone cntrati on ciceeded Tech Bpec limit an
three occasions Caused by untry of oicerito into tank
Raagent cJioe* nou porPormod lu/uampling
FILKIN3. I) RochHster Oac li Electric Corp 80/07/24 3pp
DOCKET 30-215 MILLSTONE NUCLEAR POWER HTftTION, UNIT 1
F Security, medical, emergent ij & Fire protection plans
60Q7190196 Foriuarda NRG QOC"139 Itr to rail poiuHi reactor 1 iccnGCEa, in
response to BOOS29 Itr re emorsDncy roopDnse facilities at
reactor siten Bites ID/approval to USD closed-circuit
televiBion link u/teclinicol support ctr listed
CHUTCHFIELD, D M Opcratinn Reactoi-B "ranch 5 CO/07/07 3pp
B007010337 (.amrnontc on proponed ruin 10CFR90 regulntion for Plro
protoction eiceasivelij KpeciTic fc uujuat ifiably rootrictivB
Buggneted reviaiunc io App I) u/ jiiatif icationa end
COUNBlLiH 0 Northeast Nuc-U'ar Cnnrgy Co IsuoB of Northeast
Utilities) COUNGILi W 0 Connectlrut Vanknv Atomic fouior Co
COUNBIL, H 0 Northeast Utilities HO/06/16 31pp
B0070303D6 Comment* on propoooil rule 10CFRSO renulrements far once-od
those npcoBBary to renolve generic inauBU !' oro eicesaivelij
specific h restrictive ruiuards sltDrnative rtpp R
fire protection program
COUHSIL, W 0 Connecticut Yankee Atomic Power Co CailNSIL, tl S
Northeast Nuclear £norgu Co (Dubn itf Northeast Utilities)
00/06/16 le>pp
B00709023I Foruiarda rosponano to NUREO~Oft31 criteria I. fncilities
emergency plans per MRC DOOBIE- t, 791O10 I trs Cncls avnilable
in Central TilDS only Emergency piano uilthhDld (rof
10CFR2 770)
COUN8IL.W Q Connecticut Yankee Atomic Power Co COUNS1L.W 0
NortheaBt Nuclear Enority Co (nubs nf Northeast UtilitieB)
BO/Ot/30 Spp
0007170423 Confirms position dlscuimcd In B006E'! telcon IB safegua-pda
contingency plans NRC retiuoEled rBvisinnK are ill-advisod &
unnecessary Specifics of plnn implementation can be
detailed in procedures
COUN81L.W C Connecticut Yankee Atomir PDWOI To COllNaiL.W Q
Nor tli east Nuclpar Fnergy Co (Bubs of Northeast Utilities)
BO/07/01 2pp
B007]QOT?9 IlBBponflB to 800229 Itr which cijitEssed opposition to ACIIS
recommendotion to restruttui e EiEP Rnle of licensees in
program uill Pipsnd Ltr Foruairiod to Commissioners
DENTON. M R Of flic of Nuclear Reactor Regulation, Director
QO/Ofi/IB 4pp
— B0071O0130 Eipre'iBoB npp^sition to ftrfiE FBI dmmenrfoti an to restructure
Br.P for SEP •uunors to perform E.iFety analysis as outlined
cnst in dollars & rajnpuwpr iiiould increfjsp dramatita 1 ILJ
BCHAFFHrALL. I) SEP Diuners Oronp 00/08/37 2(ip
GOD702DSi>V Clarifuj-i BOOHOft response to NRC 771030 i-eifuest For info
concerning I.eatxins Learned Task force Item 3 1 C3 a, improved
pont-fli cidont Eiimpling capahility Info ensure-", iir curate NRC
undcrstandl nj u F dnfcign philosophy !< inlunt
CDUNSIUilJ 0 Lnnnpcticiit Vankpe Atnmic Power Co COUNE1L. H (!
Northoait Nuclriiir fcnergy Co ("iUts nf Northeast Utilities)
BO/06/5'l 3pp
HO070BOID!? lorwards rc^ponnes to (JRC q.ue6ti uns re I otlrculat ion Inpp.
small break, flow ip 1 1 1 model
CQUNSILiW Q Noi-thoatt Nuclear Encroy To (5»bs of Northeast
Wtiltti-DS) BO/OA/H7 tpp
B007H40073 FlequsutB ufldl Info tn continue rpvii'iu of jnfeo.uacy of station
elHCtric ilmtrlliut i on sys voltages Response reiuos\6ii UJlthin
4S doijs oF receipt of Itr
CHUTCnriCLD. D M Oparating Reactors Branch D QO/06/27 3pp
Bfl07070HSl NotiFiUE oF change to schedule debcrlbed in B003H I 11- re
environ qunl if ic olion of safety-related BQUipmejit
Unscheduled fa-tililu outage postponed echedolpd stiirt of
19QO roTueling I'utano for ti|iproi 2-fl uks
COUNSIl . H Q Worttifr.lst Mutie.ir Enorgy Co (subs of Northeast
Uti Uti Bit GO/ 06/30 2f>|)
B007170319 Summary of B0061S meeting u/util» in Betlujs-da, MD re interim
TOliabillty evsltiflilnn pToyrarri
OLGHAN,L H Op prating Reaetpr', Ilranrh 1 00/06/30 3pp
D00723DI11 Forusnda NP?L "E-EZJ1 Toclmical Evaluatinn Topic Vlll-fl,
Electrlc.nl Poniitrati nris of Realtor Containment " ftstiEasment
compiaroft fatittty uj/crlterla currently used by ragtila t ory
pBiaarnpl For laci-nsing neu farilities
CRUTCHFIELD.D l)p.0rJting Rcat loi s "ranch 1 BO/Q7/01 3pp
— B00/230')!34 "Ski3 Technical Evaluation, To(ite VIIl -1* Elot tri(*l
PonetTHtions oF Raattor < onteinment "
" Operating f»e»clnr& Hrftneli -j E10/07/01 9pp
0 Ad jud icatory torrospondonu e
B007310243 ForuarilB CoramiBBlon 90D3?7 memorandum !i order containing
itBtiiions on DCS 780302 petition for rec onslili'Tation of
7B0413 memorandum fc order UCEi 77ll(M petition sought artlnn
re fire protection for olci Iriial irililes
EIBENHUT.D 0 Division of Lirensing 130/06/35 B9p|i
1 Financial information
007330694 Advliita that »flC das approved concnptiis! design of post-
accident sampluin) sys Lints soveriil add) ai eas urhich should
lie ddifr EitBid
CRUTCHriFLD, » M Opernting fleattnrs flranrh 5 F30/07/O1 3pp
000/100200 ronuaids response to NRr UnOOSO? reniiests for add! info
re prnpseU rnvi^iont to ETS SH.ite Df CT Dapt Environ
ProtsrlJon (iJJCfil 1 i tr approving Thermal Plume Study Rapt
unel
COUNSIL. IJ 0 rim-tlieoct Utilities B0/07/OJ ?7pp
60071S0652 Foruardo 1980 couh flow enrimatiiB for CT Light ti Power Co,
Hartford Eloctric Liuht CD !. Hen torn MA Clcrtric Co Cosh
Flous are adequatn tu meeb pn^Bntinl premium requirements
fnr 197S amends to f'nco-Andortson Acf
O'CONMDRd. A Northefist Utilltipo BO/07/03 2pp
B0073103B7 Foruartlh inFo re environ quil li f ic (it ion op ulectrical
equipmani Info njpcrspilea info provided by 80060? Itr t'
reflects additions !< Jelettons fmm urigin<il llstino
COUNSIL W 0 . TEG. W I" Uorihe,ist Nurlnjr Cnei fly Cn (suha of
MDTlhMst UMl itiffs) BO/fV/07 Sllpp
42
DOCKETED ITEMS
B007220457 Application For era-end It
incorporate changes tn Tech Sppc!
Class I fee End
COUNBIl-.W 0 : FEt.M F Northeast Nuc 1
northeast Utilities) 30/07/14 3pp
enit>5 DPH-21 ', DPR-&5 to
organi i ationa 1 title
Energy Co (subs
BOD7O2U70Q Forward* IE Bulletin BO-IS. "Possible Loss of Emergency
Notification S-y 5 (CNS1 U/Loss uf Offsite Foyer " Written
response required1
GUIEfi.B M Region 1. Philadelphia, Office of the Director
BO/06/1Q Ip
— BO07220467 Proposed revised l>ch Spec*, i ncorp orat ing organ Jet I oriel
title changes
i northeast Nuclear Enerflij Co (subs of Northeast Utilities*
BO/07/14 lOpp
B007ieoS37 Submits rep 1 1| to IE Bulletin BO-OS re e lamination of
containment liner penetration melds Dua to. absence of
abnormal c ond i t i ons. no further action planned
COUNSIL.U 0 Northeast Utilities EO/06/19 Itpp
BQ072503GO application to araend I JCBTIBP* DPR-21 t, DPFt-tS, c larl f ij i ng
Tech Specs to reflect recent organ! *3t i ona 1 title changes
License fee trdnsrm ttBd BO07 1 1 Affidavit end
CDUN51L.W C Northeast Nuclear Energy Cn (subs of Northeast
Utilities) BO/07/13 2pp
B0073I0361 Faruarils IE Invp Repts 3Q-S45/BO-O7 & 30-33i/80-03 on
BOO5Ql-3i No noncornp 1 ianr e noted
DRUMMER. E J Region 1, Philadelphia. Reactor Operations Nuclea
Support Dranch BO/0&/W 2np
--BOO 72 5 0303 Proposed revisions tn ET5. Pages S 1-2 i 3 l~5i re* 1 ecting
recent organt lati ona 1 title thanges
* Northeast Nuclear Energy Co (subs of Northeast Utilities)
BO/Q7/1S 3pp
9007280-076 Responds to BOO31H 1 tr to -J Afiearne ohjecting.cn behalf of
Dinners of plants under SEP revieiu, to current plans For
expedited review oF environ qualification of electrical
Hnuipment Forwards applicable mcinri'randum t, order
DENTON.HH Office of Nuclear Reactor Regulation, Director
BO/07/16 4pp
8Q072BO574 Application for amen* lo Uictnae DPfi-21. provid 1 ng further
assurance of adequacy of electrical distribution sys
voltages Class 111 fee irncl
COUNSILiW G Northeast Nuclear Energy fa (subs of Northeast
Utilities) SO/ 07/16 3pp
— B0072flQBB2 Proposed Tech Spec changes providing further assurance oF
artoQtiacy of electrical d iitnbut i on "njs voltages
* Nurtneast Nuclear Enei gy Co (subs of tinrthcast U-t 1 1 1 1 i e s 1
00/07/31 9pp
8007200673 Requests BI tension op commpnt period re NUREQ-G&77.
"Potential fi>r Lou Fracture Toughness [< Larnollar Tearing on
PUR Steam Generator ti Reactor Cooldnl Pump £upportc.i" until
Q00915
COUNSIL.VI 0 Northeast Utilities !30yO7/Pl 2pp
0 Inspection reports. IE Bulletins !i torrcBpondonc e
BO&714O4Sa Foruards IE Ilullatln HO-13, "f rack I no, in Core Spray
Spargers " Written response required
CUIER.B H Region 1, Philjd B 1 ph i a. n*fico -of the Director
BO/05/IS Ip
BOQ702OI4& Foriviarris IE InFo Notice 30-22- "Breakdowns In Contamination
Control Pro-grams " No written response required
eSIER.D H Kegion 1, Philadelphia. Office of the Director
BO/OB/ 20 Ip
0007010313 Foruiards IE Info Notice SO -2H, "Loss at Suction to Enmrnoncy
Feeduater Pumps " No written reaponao rinuired
OFlItR.D » Region 1. fhtlada 1 ph I a, Office of the Director
80/05/29 Ip
— 800731036* IF Insp Flopts 5Q-245/BO-07 it 3O-336/HO-O5 on 000501-31 No
no-ncotnp 1 lance noted Major areas Inspected control rooms fc
accessible portions of Unit 1 reac tor. turd me. radiuaBtei gat
turbine gsnerator b intake bldga
EXEDLOHKV. J T , IIMHERMAN.Ff P Flegion ), Philadelphia, Office of
the Director KEIMIfl, R R, Region 1, Philadelphia. Reactor
Operations Nuclear Support Branch 80/Ofi/lQ 9pp
9007020491 Forwards IE Circular 90-15, "Loss of Reactor1 Coolant Pump
Coaling & Natural Circulation Coo] down " No written reapotise
requi red
QRIEff.u II Region 1, Philadelphia. Office of the Director
SO/Qi/20 Ip
Fdruiards IE Circular ao-lfl. "fiailtoactive Contamination of
Plant Bemlneral ued Water Bgs J< Ffesultant Internal
Contaminfltion oP Personnel " No written response required
GDIEH.B H Region 1, Philadelphia. Office of the Director
BO/06/34 |p
B007210307 Foruacds IE Info Notice 80-24. "Loui Level Radwants Durial
Criteria " No written response required
GRIEFMI H Region 1, Philadelphia, Office of the Director
BO/06/25 Ip
BQQ723Q146 Forwards IE Bulletin B0~lfc, "Potential Misapplication of
Rosemount Inc Models 11S1 t. 11S2 Pressure Transmitters
M/Either A or D Output Codes. " Written response required
IE Circular 80-14 also snc 1 No uirittcn response required
QFilER. D H Rvgion 1. Philadelphia, Office of the Director
SO/Ot/27 2pp
S007310071 Confirms that 20-day period for teats in Itom 2 of IE
Bulletin BO-17. "Failure nf 76 of 1B3 Control Rods to Fully
Insart During Scram at BWR, " started at IS 01 AM on BOO 709
H*q.ueslB notification of niol function fc estimated manpower
GRIEn.D If Region I. Philadelphia. Office of the Director
BO/O7/09 Bp p
6007390697 Submits addl reKponse to IE Bulletin BO-17. "Failure of 76
of IBS Control ftods to Fulli] Insert During Scram at QWR "
Manual scram test j-avpaled test connection wiring error
Hiring corrected d functional test performed
KfinCZKA, E J Northeast Utilities BO/07/H1 3pp
R Periodic operating reports fc rolateif correHpondence
8007210^80 Forwards IE InFo Nutice BQ-3t>, "Evaluation of Contractor
OA Programs " Ho written rpsponsn roquired
QBICR.D H Region 1. Prtt lade 1 ph i a, Office op the Director
BO/06/10 lf>
800702O669 Forwards sitn-Spec i F i c !. generic c;UB5tloli& re OE d)sc
cracking indications per B00109 niitgttnv t, IE Info Mot Ice
7?-37 on MestingMouse 1 oiu preseUTF- turbinoG disc cracks
Response requested uithin 30 dayi W/o encl
CRUTCHF1EUD.D Operating Reactors Branch 3 £WO(,/11 ^pp
BOO716OA76 ForuardR Biontnly operating rept for June 1780
MHDC2KA, E J Northeast Utilities 80/07/09 Ip
— BC-0716G&BO rtontnly oparatlng ropt for June 19BO
HARRAN.D Northeast Utilitien BQ/07/O7 9pp
HO07ieO-1oa Foruiardi monthly operating rept for June 19BO
(WOCIK-A. E J Northeast Ku clear Energy Co (sub a of Northeast
Utilities! DO/07/O9 Ip
S00714Oa60 Forwaids IE Dili let In no-lfl, "Degradation oF QHR Sci-am
Discharge Vol Capflbilitij " Written response rnquired
GRIER.iill JJegion 1, Philadelphia. Dffice of the Director
aO/Oi/12 In
8007170120 KBBpondi to IE Bulletin BO-06. "Englneerflif SaFetg Peaturo
tEBF) Reset Controls " Three futilitica will have cnmpletud
moils peT !£ Bulletin OO-Oc, 6y DlOlOi List of equipment fc
statusi of criteria enc 1
CDUNSIL.W B Connecticufc var,kc-e Atomic Power Co CDLJNSIL.M 0
Northeast Utill'iea 30/06/13 43(ip
— SQD71fl(HI3 Month lij operating rept For June 19BO
HURRAN.fl Northeast Nuclear Energy Co (subs
Utilities) BO/O7/O7, 19pp
of Northeaib
3 Repartable accurrenc as. LEFts (k related correspondence
B005230iai PNO-I-HO-O71 on SOO509. sign! f leant number of security forci
f ersonne 1. contrac ted From Interstate Security fives. Inc. began
taking leave at start of mid-shift Security supervisors
tuorklng 12-h shifts ui.ll maintain full coverage
ZIMMERMAN. F) P , H.EIMIO, R R , DEWLIN.JH Region 1, Philadelphia,
DFFlce of the Director QO/G5/O5 Ip
B007100157 Forwards. LER BO-OO9/O3L-0
MROCZKA E vl Northeast Nuclear Energv Co
UtlUtiesl BO/07/03 1 f.
(subs of Northeast
DOCKETED ITEMS
43
HO-009/031--0 on BOOftO'Si dur ins routine survei 1 lanco, found
tch 263-3*>C tripped outside alltiuabli! eetpoint
i-nmnt drift frensuro switch reset lo required
BO/O7/O2
3pp
S007100167 Forwards LEIf SO-OQB/03L-0
«MZRA.E J North.a.t NuclM. Energy Crc <*ubs of Northeast
Utilities) 90/07/02 IP
-(1007100172 LEII BQ-OOB/03L-0 on 000601. dn i- ing routine surveillances.
^^ pressure* etches 263-WC * I^-S^ tripped outside
allowable TBch Spec Caused by -.etpomt drift Pressure
•wltchfrB reset to requirod setpointa
BIGIAREU-I.M d Northeast Nuclear Encrgg ft. (subs of Northeast
Utilities) 00/07/03 3pp
Forwards LER BO-009/03L-0
J North.*"* Utilities RO/Q7/OH
lp
LER GO-009/03L-0 on B00609. d ur i Tig roactor vessel hlnh
••tw. Bcram functional t, cal.br to at, pr* ssure sul tch
263-9SC tripped at 1103 psig Caused !>y suH>oint drift
Switch T«sot to retired sotpoint ft nat i Bf ac torlly tested
* Nortlitaat Utilities BO/07/02 3pp
6007150711 Response stating ubs
State Energy Dfc petitions to
state No petitions ta interve
pool mod issue Certificate nf
MQOHEpJ E Hearing flranrh S
nee of pending proceeding in mhi
participate as llitertsted
i' were Filed in Sipent fuel
HO/07.14 3pp
B007390522 Motion for recons i derfl t j on of CommiSBion BOO"J30 order rt
portion instituting ati juJ icdtury deoring befoi* ASLB Interim
Operations Task Force rept, <iECV-3B3, e j iminates basis far
c Ofrm^nc ement of investigation
BftANDENOUH';, D L Consolidated Edison Cn nf Heia Vork PRATT, C M
Pouer Autbopitij of the State of Neu Vort SO/O7 '25 12pp
H General
sponOence
8007210200 Responds to end 300410 H' to President Cdrter re Indian
Point facility Describes HRC effortL to protect public
health at facilities turrrntly operating DI pJantied -for
operation Village Voice neus article cnc]
DENTON.H R Office of Nuclear ft factor Regulation. Director
BO/05/21 lOpp
8007170259 Responds to S002Q6 1 tr re status '. rpsponsi bi 1 1 ties for
emsrgoncy preparedness in facility environs FEMA has lead
mspnnsibi 1 1 tg in offsite emergency planning
GRIr1E3,u K Emornency Preparedness Program Office SO/Q.7/O7 2pp
0007330212 PHCJ-1-BO-09B on S00709. Chom-Nuc 1 oar truck carrying
solidift-«*l raduaate Jeveloped ernct In main 1-boam ot
trailor Trucfc was ropnircd « releaBed BOO710
RDTM.J , CROCKER, H W . SMITH, t! H (logic"' 1- Phi Indelpli ifl, Office of
the Director BO/07/ 1O 2pp
0007290682 Requests documentation that futurp cnrrespondetic e re
facilities be addressed to P Zarabas Requests that WA Monti,
MF Bhotkouski I. JH Makepeace be placed on distr i buti nn for
anttiD corr£spondance
ZARAHrtB.P Consolidated Edison Co of New York 80/O7/24 lp
8007180396 Forwards UEH QO-010/03L-0
HHOCZKA.E J Northeast Utilities 8Q/O7VI1 Spp
— 80071903O7 LER flO-010/O3U-0 on 000613. during tcBtinn of penetration
anchor X-45 Base plate Dolts, ana bnlt l>roke !< othuri found
Jmprnperly iTiatallc-d Couao unl statutf Ooita romnvfld t>
rep lac ft).
t NdTtlieaat Wttlitios 80/07/11 lp
I Financial information
0007240127 Forwards Annual financial Rept J'579
ZARAKAS.P ronsoliddted Edison Cn of Neu Yorli
—8007240129 Annual Financial Rcpt 1979
* tonsol iclated Edison Co of Heui fort
BO/02/2A 43pp
DOCKET 30-B47 INDIAN POIMT BFATJON, UNIT^H
f Escurltyi me-dicaJi cnorgoncij t. Piro proeoctlon plant
H0071B0196 Forwarda NfiC 8004H3 Itr to nil pouier renctor 1 ICHnseoa, In
rtsponae to B00529 Itr ro nnmrDoncy i-D&ponoD Pacllitien at
rsactor fiites Silos u/flpproval ID use c loeed-t ircui t
ttlHViaion. link u/tHthnicnl nu|i()ort clr llBtnd
CRUTCHFIELD, D M Opornting rtooctui-B Hrnnch 5 00/0//07 3pp
0 Advisory Committee on Reac-tor Safeguards reports !< correspnndpnc e
B00722030H ProulUes summary of B00507-OQ meeting LJ/utiln re core melt
accident sequence'! Utils appear ta expect HRC to resolve
problems ti do nothing to mitigate consequences of Class 7
accidents
CATTDH. I California, Univ nf. Los Angeles 80/05/10 6pp
P Operating license stage documents V correspondence
BM717024.5 ForuiariU request far nuill info for rnvloui nf training t.
BU»Kf ication plan no^uiiBt uiitlilioliJ (ruP lOCFfiS 7'/0>
VARflA.S A Operating fiBactoi-o Branch I 00/06/20 Hpp
B00721O07B Advi*o« liccnaeo that design for refit Inr coolant pump oil
collection By* (Item 3 1 13 of NRC 790131 Pirn protection
Hfetu evaluation) ia oc cup tab ID
VAFtOfl, a A aperating Poactorn Uranch 1 ltQ/Oi/30 Spp,
0 Adjudicafcori; cDT-ruspnnnBnt n
8007310243 Formnrds C.oinmi asl on 0009H/ mofnornnimm (• order contnininfj
J.cislona on UCS 70QB02 petition for recons Idorolion of
780413 memorandum !< ardor UCS 771104 petition sought action
re ffr» protBciion for electrical cfllile*
EIBENHUT. D O Division of Licensing BO/Oi/HS t)9pp
B0070902I5 Order jranting oitenaion until 000729 foi Commitalon In
con*irfnr whether to rovieu ALAB-436 8< porLlans of Al Al)-5il
HOVLE. J C QFfJco op llio [Secretary of Uio Comml*6lon 60/07/07
IP
E00723O160 rtsHpQhBa in opposition to (ISC motloit for diftqunllf Ication of
Chairman Hendi-Jn re UC9 790917 petition sifeStinD shutdown of
FeclUti). Motion failed to show bin* dsPlneU bu Bw|imm» Court
In With row vs Larkin procoDding
PBATT'C M Pouior rtuthority oP thu Btato Of N»ui York
BftANDEMBUROr D L Cooao 1 1 dfltcil Ellison Co of Wuui Vorli BO/07VOB
8007l'?03fc3 Order nrantlng e*tfnB)on until SOOHOl fr»r Commtsslon to
»ltct whuther to review ALA"—5:Ji !• rnlovarH porliono of
- 1
C Office of the gecrntnry tit thi' Cniimisniun 00/07/10
B007020109 Forwards notice of proposed is5u«ince of smenO to OL Metn&
concerns 790907 applicfltion for increase in spent fuel
storage capacity
VAROA.SA Dpcratlno Reactors Branch I 00/05/19 2pp
— B007020357 Notice of proposed issuance of amend to facility OL,
increasing spent fuel atoiage rapacity
VARBA.BA Operating Reactors Dranch 1 80/OS/19 3pp
0007330099 Renuesls submittal of proposed Tech Spe* changes providing
for redundancy in decaij heat removal capability in all mpifes
of operation Mudel Tech Spots lohich. would p-rovidc atceptable
resolution end for guidance
E16ENHUT, 0 0 Division of Licensing BO/OA/ti 62ps>
000710039^ Summary of B00520 Technology Eichangp Meeting 3 ui/utils in
Botheoda.MQ to aiscuss accident mitiQation features for
power plants
LONG.J K Division of Systems Inlegraticn HO/06/U 75pp
0007140192 Submits ippt of tain force on interim operation of
facilities Rppt includes accident riifc eonsiderat i oos. sor lal
(t oconpmic impact coniideiations t- summary of public
HMW*Ul>F > Offtce of Policy Evaluations DlCHHIT.L Office of
the General Counsel ECCY-BO-383 80/06/12 ABpp
— flOO/ltOWO Summarltes vieuo of Economic Regulatory fldmini strat»Dn, Di
of Power Supply |( Reliability re electric sys reliahilltM
impact of operation Df fa,.litil-S as (.nrH.d in NRC BOOS3B
Itr
WE I NCR, ft. G Energy. Dep 1- i'f 80/05^15 4pp
B007010W For-^rds intHrim safety ^v-luatign of •">l"rg fePd^ater
• u» reliability R«4«rit« *ddl info to CMP I *te NHC revlelu
of Loasons Learned Task Fnrce Itema 3 1 7 a & h
VARGft.S A Operating Reactors Branch 1 BO/Ob/lT ^pp
DOCKETED ITEMS
Inliri
recommrndiilions
* titrating Jlenct
5<iFelii evaluati
Br
. liarij Feedh
cli 1
J rnp It
010110 Notification of 300425 n*«ting u/utilt !- Eland la Labi in
fth.estf.il MD -fur preeentat i un of overview of facilities risli
uily Agr-nda tut I
SHAELiS L lifliabil Lly tt liml Aftiesiaient QranLh QO/O6/lft 3fl
0-10073 Notification of fWOfiPJ) irioctiris u/util to discuss NJiC
-evaluation of u|ierjtional GA program for facility
INUrtV, J T (lunlily rtssiii ance t*i-r>ntn QO/Od/17 2pp
170447 Forward* re(|iiost Pur ,-iddl info li
octric d 1 sin but Ion sijs volt.ifies
ROAi ") rt Dp*r<itin|i FlcHctni-, Branch 1
: amp 1 o Le rcvl ru ftf
App
5007330471 Forwards f , na 1 response to rsquijst for add! info re
ilettrical ovtrnde /by pass flipoctb nf containment puroe
per A SchwBnc»r SOO423 1 tr
2fJtMf\B,f Consolidate Edison Co of New Vorli
igs,
BO/Q7/13
I7pp
Inspection report*, IE Bulletins *, c orronpondonc a
80070.30124 Towards IE Info Notice BQ-S2, "Br.akdoLms In Contamination
Control Program* " Ha written response required
CRIER. B K Reoion 1. Philadelphia. Office of the Director
""°r
B0070103HS Forwards ]£ Info Notice 30-23, -toss of Suction to E«ero«ncu
Fe-Bdmater Pumps " No written response reouired
CRIER, H M negion 1, Ph 1 lade 1 nhia.
Ip
of the Director
110357 Summiirij of EOQS30 meeting y/util in Betheaflfl- MD re status of
ti on plan
.BXAN.L M Opprntlng Reflttort IlpnricJi 1 QO/Oft/23 3pp
'010600 Nnttf Iration op G<]06L/ mpEtlnij u/utlU in llcthestfa. MD- to
SCUBB c ontnlnmt-iit ttructural reEipon-sci F<i i 1 jre piessures d
illui-fl mqilPii fur facllktios .is deacribt'd in fJUC 800410 ] tr
Ccimm Eil
.VCH.J F Rrattoi- SyBtems Brancli 00/Ofj/2A 3pp
090220 Ppriuards "Enduranc* Tottino of Auxiliary Boiler Ferduater
tnpi," pur ItulHitins t, Urileri. T.isk Fore p Hhort-Term
CDmnenildtl on 3
H1LL.H J Consol Irlatffil bilicon Co at Ni-y Vnr-k (10/06^30 13pp
090391 Forujoids detailed info fur i mfi 1 emBnt.i t ion of NUIEO-OSya.
bRgorij I) renuir«ment o, per 77IU3I t caponio tu
commenilat ion S 1 /j{b) One Illcglblp Liuiilirtvij bldg Jraulng
•lILLiMJ Cornol liliitod Fdisonro of New York RO/06/3O llpp
17031V fiuinmaru uf 000*1 a met'tiriu u/utils in [ipthe^da, MB r» Intrri
liability ivalimt Ion program
iKflNiL N Opnr.itlng llfactori. Ilr.intl) 1 QOJQttfXQ 3pp
310019 fliitijfr&fcs that util aiibmit revised scftedule J( justl f tea I i on
i completinn nf ATWfc moile utthin 30 da^s Utll IE roquastud
iwprovt upon Fall 1102 coraplptmr, date tiucduse of rnk
t-msvnted bg facility
!OA.HA npfrriitinu Henc Lnr* Brani.li 1 flOXOft/10 Hpo
aiiO'19i! "Eviiluatinn of Imp ingoment toinoi of Mhlte P*r(h al Indian
Int NucLtar Strttlon ti OttiL'i Hudson Itlvei Pout! I'lants "
i HINKLE.H j DADMtHOUSE.L W , KIFtK, 0 L dab Didyc National
oratonj TIN R-043T NURf 0/CR- 1 10O flO/OA/30 ] 93pp
170341 Forunrds Tsquctt for ndill info fe ti jr k# i tting op tevrrt
Idunt mltiS'iUcin PeaturiM, JicEiujniv requ«i tvd within 30
»
-'AH-T M AtnlBtant DIrcctnr for DperaUng Reactors flO/O7/'03
'50001 RiquBtti tub mi It fll nf ap p 1 itot ion for ansnd to llctniB
niatlna at Tech GPLT chnnuci (< littnta tnnJittniiB run
1*1 Ttth GpBC» ti Model license rondlttnn« for TMI-a
iionis Loarnid Cutcyory A itt-m-, i-nt L Fur guidance
3ENHUT,B 0 Dlvlttnn Of LiccnEing RO/07/OE.' i^^pp
17039(1 Bufwinry nf BOO/jPS niKjUii^ ui/Pic fcaril, I DWK (' OnrTicKlnc re
k ituily Inc 1 udiriQ nodelliv^ for plump t,reig n toryi
itralnntnt ftvvrtt (full !i ranitcl ingi use ti f plant dnta !<
iild»r»t(,an «f f-ilrrnnl events
1AEL, EL Ruli.ilil li ti| !< Kink rtt,i,(-,iimunt Drijutti BO/07/0/ i3pp
00070100BJ Responds to IE Dulletin HO-03, "Vacuum Condition Rs
In Damage to Chemical Vn 1 Control Si)S <CUCB) Holdup Tank* "
All Unit S tanli that coul* contain pnraarv sys water have
adequate protection Bulletin nnt applicable to Unit 1
CAMILLA M J Consnlldated Ediion Co of Nau Yorlc SO/Ot/Ofc
3pp.
Siummari) of B-00!50^-lliJ ter linoloflij ciilinniici no-rtings u/utlts
hkEJigoiIL r» cure malt .icriilcnt ssijiif-nc t5 t, iistiicc liitod '
iOBBnill ogy' far Facilities KRC peruolvui real urgency to
aniutrs. to kslj technical quesi 1 1 iins
U.J F Re,Ktnr- Hys-Urn* Br.inih EJOVO/XOT ISpp
roruwrilt *ddl irrfo re efFe-cls i^ Mundlng dua to fallurr o
^Cl»«» ! lAliHhiC aqiflpment. pnr HftC flOOWO reituest
r« t if drawings availabla in Central Filua only >
WA8.P Coniolldated Edison Co oF Nnur Vorli HO/0-7/14 31pp
ItlPo re CM
3pp
ru«i-Di rni|>Dn»» tn MRC B0090a requ«»t Poi1 iiddl
iflrant * r»vi*»d resp-onBe to Ouostion 10i nrij)innl ly
nltttd bg utll (100523 Iti
CDln^nlldflt^^d Cdnun Ti> of New Vnrli HO/07/13
B007020077 Forwards response to IE Bulletin B0~ia, "Decay H..t Removal
Bus (IperabUitu. " Bulletin not applicable to Unit 1 uihich
i* In flepuelffd rendition Eilsting Unit 3 procedures provide
for adequate alternate neons -fen- removal of decay hea-t
CrtltILL, U J Consolidated Edison Co of New York SO/Oi/Oi 5pp
BOO731O553 Forwards IE Info Moti-ce HO-26, "Evaluation o-f Contractor
Oft Programs " No written rpsponse required
•CRIER, B H Region I. Philadelphia, Office of tha Director
WV04V1O Ip
BOO714034I Forwards IE Info Notice BO-E7. "Degradation of Reactor
Coolant Pump Studs " No specific action nr response
GFilER.D H II eg ion 1. Philadelphia. Qffitu of the Director
BO/06/ 11 Ip
0007170i>a7 Fonuardi partial rnsponse tn IE Bulletin BO-OA, "Engineered
flafoty Feature (ESF) Reset Controls," f-or Unit S Unit 1 uias
shutdown 7UI031 >< In dePueled tonfliti on. therefore bulletin
not app 1 itable
C^HILL, H J Consolidated Edison Co af Neu York BO/O6/13 5pp
B00702071O Forwards IE Bulletin BO-13. "Possible Loss of Emergency
Notification Si|s <EN9) W/Lo-s s. at Offsi». Pouer " Mritton
retpon-se raquirod
CRIER. B H Fleolun 1, Philadelphia. Office of thir Director
HO/06/ IB Ip
BOO731O197 Forwards IE ln*p R»pt &0-2-^7/gO-06 on B00513-16 No
noncompllance naked
nnUNNER.E J Region 1- Phi lade l[>hlj, Reactor Operation! Nuclear
Sup part Branch BO/O6/1B Hpp
—3007310301 IE Insp Rapt 50-247/BO-06 on OO0313-1A No noncomp li anc •
noted MSJ.DT a-reai Inspoctcd LOCA procedures »i training- af
]iten»ed operators in use of LOCA pruc*durt*
9, J C Rug ion 1, Phi ladi Iph ia. Office of the Director
D Rag ion ]. Philadelphia. Reactor Operation* NutJe-ar
Support Kranch 8O/O&/1A Bpp
00070304 7 7 Foruai-ds IE Circular DO-IS, "Loss of Reactor Coolant Pu»p
Coollnn fe Natural Circulatinn Cnoldoun " Mo luritten response
raqulreil
CfllER, B H Region 1. PJi i 1 ail el pti I a. DPfic* of the Director
BO/06/ 2O Ip
OOO7laO34O RvapondE to IE Dullutin BO-O9 Ho Hgdram-o tor actuators u»nd
in any Unit 3 sa futy-ro 1 ated <>i|s Unit 1 presently in
d»f uel oil cmidi t i ifn
CMHILL.M J Commnnuealth Edison Co 80/06/30 Ip
B007I8039£ RespondB to IE Bulletin BO-1Q Invest! ga ti on revealed
potential for nonrad i oacti ve ii^s to beconue contaminated
tAraugh isolation valvo seal uatcr/city i^iater interface
Bou-hle chect valves installed Honitorini program denribed
CAHILL.W J CoHMioniKBalth Ed i ion Co BO/DA/2O 2pp
6WO7I60689 Forward! IE Circular BO-14. "Hadioactivo Contamination of
Plant DR-nlneraliied Uater Sijs tt Reiultan% Internal
Contamination of Personnel- " Nn written raiponka refluind
CRIEfl, D H Region 1, Phila Jalphia. Office of the Director
Ip
DOCKETED ITEMS
45
BOO7210172 Forwards IE Info Notice B0~34. "Lou Level RaduaEte Burial
Criteria " No uir i t ten response required
DRIER, D H Region 1. Ph 1 ladelph ia, Office of the Director
BO/06/23 Ip
BO07230106 Forwards IE Bulletin BO-16. "Potential Misapplication Of
Rosemount Inc Models 1131 t 1152 Pressure Transmitters
H/Either A or D Output Codes " Written respnnse required
IE Circular BQ-11 also end No written response required
ORIER.B H Region 1, Philadelphia. Office of the Director
BO/06/27 2pp
R Periodic operating reports !< related c urrespondence
DOCKET 50-347 DHFBDEN MUCLE.AR POWER STATION, UNIT 3
F Security, rnailn.nl. emergent u. ti FITL> prntpitum plans
80O7O1O147 Fnrwards snFegunn
PEOPLES, D L CammDmJcalth
c ontinginc ij plan amend Plan withheld
fison Lo £10/06/27 Ip
CM of safe shutdown analysis
s fire protection will
BOO729O563 Submit 5 results of mim -
No reasonable rfssuranc. e th.it lice
allow safe shutdown of Units 3 t, T A'> inin, n cornmeinJ 5
requirement for alternate shutdown bys DT ctt il I cdted EIJS
HALL, H E UrooXhaven National L.ibor.itury BO/O7/09 7pp
B007170363 Forwards "Annual Environ Monitoring Rept, Part D Rad i oilog i cal
Rept "
CAHILL.W J Consolidated Edison Co of Neiu York 80/06/30 Ip
— BQ07170363 "Annual Environ Monitoring Kept, Part D Radiological Rept "
* Consolidated Edison Co of Neu York BO/06/30 66pp
B007130669 Submits daily fiih counts from intake screens for June 19BQ
HONTI.W A Conaolidated Edison Co of Neui York 80/07/10 17pp
B007310473 Forwards util 800613 I tr d "Quartarlu Rept on Seismic
Monitoring Nttworl in Vicinity of Indian Point, NY,
Con Ed Project Dec 1979-Feb 19BO "
DAVIS, J P Consolidated Edison Co of Netu York 00/07/14 Spp
8007220476 Forwards monthly operating rept for June 19BO
7ARAKAS, P ContiDtldateil Edison Co of Neu York BO/07/15 Ip
— 8007230479 Monthly operating rept for June 19BO
EICH.E Cnnsolidatad Edison Co of Neu York BO/07/OH 7pp
BDD7220S23 Foruards "Dallij Count from IntaVe Screens fur June 1980 "
ZARAKASiP Cansolidatad Edison Co of Neu York BO/O7/1S Ip
0 Ad j udicatory rnrr fsponilenc
Q007310343 For-iuard5 CDmrniSBinn S00ri27 mefnor.mdum !. 01 HO
dociaions on UCH 7HO5O3 petitinn for retonsi deration
7B0113 momapflndum ?i ordfir UCS ?7110'1 petition soiigtit
re fire protection Per electrical Lablua
EISEMHUT. D 0 Bwismn n F Ln enoina 00/06/35 69p
3007010331 Forwards safety evaluation t< E1A ro appnt fuel pno] mods W/o
enc 1 1
GDDDARD.R J Hearing Branch 3 (30/0(,/?7 Ip
P Operating license stage documnnti !i c
B00723002B Bummnry tif BOO2O7 meetinn in/Mark 1 owners group in BeUesda,
MDi re revisions to HRC flccep tattce criteria !t on titanil ing
issues relative to Ma.rlr 1 cuiit,)inment lung-tei m oroiiram
ORIMES.C T Plant Systems Branch BO/02/21 31 p[)
B007O10003 Forujard5 safety Evoluition !i E1A supporting proposed
facility mad1; to incruaSB spent fuel storage [ioul capflcity
FinaS approval cannirt be granted until A5LD rpiolvrs legal
i ssues
CRUTCHFIELD-, D M Operating Reactors Bi-antl) a BO/O6/05 3pp
— B007220324 "Daily Count from Intake Screens for June 19BO "
» Con»olidatei) Edison Co of New York BO/07/1S 4pp
B Reportable occurrences, LERs fi related correspondence
9007020145 PNO-I-BO-093 on B00617, util markers Union Local 1-S
authorlled strike on BDD&18 Senior operators arc excluded
Required IE prestrike maps have been completed
OHEENMAN.E Q . DRUNNER, E J Refiion 1, Philadelphia, Office of the
Director BO/04/17 Ip
B00711039i Forwards LER SO-003/03L-0
ZARAKAB, P Consolidated Edison Co of Neui York
—8007110404 LER BQ-005/03L-0 on B00607, perturbation in secondary
b loud own piping associated ui/stvam generator 31 resulted in
failure of pipe clamp associated w/initbber 46-8R-3 Caused by
failure of water hammer Pipe clamp repaired
MAKEPEACE.J M Consolidated Edison Co of New York 80/O7/07
2pp
B007B4O167 Forwards LER BO-007/03L-0
ZARAKA5.P Consolidated Edison Co of New York
— B00724017a LER BO-007/03L-O on BOOdHl . found control for auliliary
fe«dui»t«r pump 23 transferred to local Caused by
unauthor i zed actuation af pump transfer switch Responsible
personnel dismissed
HAKEPEACE, J ht Cormolidated Edison Co of N*u York BO/O7/17
IP
T Hearing transcripts on non-antitrust matters
80O71400B4 Unofficial transcript of B006S6 briefing on recommendations
of Indian Point Tasl Force in Washington, DC Pp 1-63
Viewgraphs end
* Commission 80/O6/36 64pp
B00724O1&,4 Transcript of 000711 public meeting in Wash >ngton> DC Pp 1-6
* Commission SO/07/11 6pp
— ei)07OJOOOB Bofpty evaluatimi supporting propose-d facility mails to
increase spent fuel sLurngt- puol tdpaclty
» Office uf Nuclear ftpac tor Rt-gulation, Director 80/06/Qfa
14PP
— S007O1001 1 E!A suppnrtinij prnposci! facility muds ta inLrease spent fuel
Blor<i[je pool capacity
* Office nf Nude til Reactor Rugulatiuni Director 00/06/Oii
lOpp
BOO70301Qi Rcque-sts conperatinn in NDC studij of peop 1 p-rrla ted security
problems in nuciear industry
CRUTCItFIELO. I> M Operating Reactors Branch 5 BO/Oi/11 2pp
80O701O07O ReEponds to FDIA requpst for 17 dotuincnta referenced in M
Tatar nemo ti> ACRfi concerning pellet-cladding inter nc tlon
Forwards documents Missing rECorilB ale dup 1 i tat I ve.
sup BrscJed or available elsewhere
FELTON.J M Division of RuScs and RecorflE flO/Ofa/nQ 3pp
BOO-7010OSB Distuases s)mi 1 ai 1 liei in fuit) Fad fatluies for DWRs
resulting frurn control <il<i-dc muvements Frilluit pnttorn
u/DroidBn & LACBWR Fuv) rods lusd a-> snc. int ed u/ loca tiun of
fuel rods relative to control rndb
SIEGEU, B L Atomir Energy Cnmmi65ion. DIrrctoratc of Ltceniin}
5pn
— B007O10103 Fur war if i summary ot Mfir /SOP19 meetinQ u/util OE, Comm Ed &
BNHL to discuss fuul Failurp detecrinn MJB * All uhlch
resulted in p Bl ) r t-c ladd i rvg me-chaiu cnl interaction fuel
Failure Discussion outline- {, list (if attisndues «ncl
BIEQEL.n L - HACE.N. H , F1END.D Cnve PDrformiinto Branch
73/03/03 9p(i
B007O70!lfi Bubmitft revised responses to NFiC 77OAO3 Itrs ro
aectjnd 1-evnl of undervaltdfo protection far 1 KV emergency
power dusn supplying saf e tij-related loads
JANECEK.R F Commnnuie-al tJi Edison CD 60/06/26 4pp
BO070B0063 Responds to h«C JJOOBI1) requoit for addl info concerriing-
adrquacy nf Etatmn electrit disti ibntiun sys voltages
JANCCEK, R F CnmmgnuBaJ th Hdisun Co i!0/O6/30 4fp
B00723O347 Unofficial transcript of B00717 discussion on Indian Point
in Ha»hington. DC Pp 1-73 Draft memorandum & order end
* Commission, 30/O7/17 BOpp
BO0707034& Foruiarils revised scliedulL' *i atntu-s info (or Mark I program,
foeduater spjrger replateinont 'i general uior k planned for
Quad Cities 1 outage PP-OCPBI! inrj nn priority basif. ui/moila
providing largest lafitij ini r eiiso margin'
REED.C Cnnmonuiefll th Edison Co BO/07/0;1 16pp
46
DOCKETED ITEMS
BQO72J03I2 Responds, to NHC r t nut B t Fr,r driill Info re turbine dltfci
Applicable tut bint. ni'.siU ,in,ily*ns uja^ prusentpif in Ampnd
2 tu (luaii Cities 11= ^plication ftnalifsis .ipplies. to Dipsden
due tn similarity of general flt-r.sngerneri t
F ron-.-nonut-allh FriisnnCo BO/07/15 Ip
BQ0717O'130 Forwards IE Circular 30-14, "Radioactive Contamination of
Plant Demlneral ued Water Sys tt Resultant Internal
Contamination of Personnel " No ujritten response required
KEPPLER,J G Region 3, Chicago, Office nf the Director BO/06/34
0 Inspection repurt-s IE Bulletin* !, 101
BOO714O545 Fondants IE Ilulletin 00-13, "(ratting in Core Spray
Spargers " Written rcsp out e raqui reil
KEPPLEfl, J 0 (legion 3. Chicago, QFfice at the Director BO/O5/13
BOO7S302Bf Forudrds 1C Bulletin 00-16, "Potential Mi sappl icotion of
Da s amount Inc Models 1151 t. 1 1 52 Pressure Trannmi ttsrs
H/Either A or D Output Codes " Written response required
IE Circular BO-li also enc 1 No written response required
KEPPLER.J Q Region 3, Chicago, Office of the Director 00/06X37
Up
BOQ7074JQ7*; Furuard-, IE Insp Hepts 'iO-Cyl 0/BO-09, EC-.*!?/ BO-OS 1.
SO-2-19/QO-32 on Bi>0fl07-0502 ', notice of violation
KEPPLFJJ.JG Region I!. Chicago, Dffici- of the Dirpi-tor BO/05/S3
B0071BOOOa ftck receipt of BOC-613 1 tr informing NRC nf steps taken to
correct violations noted in IE Insp Repts 50-01O/BO-09,
59-237/8O-OB ft 50-249/80-12
KEPPLEfi.J S Regjon 3, Chicago, Office of the Director BO/07/01
IP
— B007O7G074 Notice uf violation from in*p on 000407-050-2
« lleoiDn 3, rnitagu, Office nf the Director BQ/Q*i/33 Spf
— 0007070090 IL Insp Repts SO-1 0/BO-09, SO- 237/SO-OE t, 50-349/80-15
on B00407-050^ rJoncomp 1 *anr i f noted failure ID adhere to
Oft program requirements Con tarn ma ted clothing Found lying
Inside control U>cl can tamira tetl arcrt
SPESSAftD. n L , UAKKCR.J L , TDNC'JEi T ft Region 3, Chicano, Office
o-f the Director BO/Q5/23 7pp
B007O20065 Foruarrts IE Info Notice OO-SH. "Breakdowns In Contamination
Control Programs " Mu ujritten response required
KEPPLSR.J S IJeginn 1, Clucano, Offitf of the Director BO/O5/28
IF
a007O100B6 rc-rwnrdi IF Info Noliie flO-23. "Loss oF Suction tc, EmBrgency
Feeduabcr Pumps lh Ho written reiponsi' required
HEPP4.GR.J 5 Region 3. Chicago: Office of the Director EO/O5/29
aO"07O3Q75£ Forwards revised response to IE Bulletin 79-O1B, "Environ
dual 1 f ica t ton Df Clans IE Equipment " Identifies areas uihere
effort Is continuing in identification of equipment
quail Citations U/o end
JANECGB.H F Commonwealth Edison Co SO/06/02 If
8007020074 Forwards revised TP5fionsH to JE Bulletin 79-01H, "Environ
•Qualification of Class IE Equipment " W/o encl
PEOPLES, D I. CDrtimonueal th Eilisnn Co RO/06/10 Ip
—3007130010 Responds to NHC BOOS33 Itr re violatidns noted in IE Insp
Repts 30-O10/BO-09, 30-237/BO-Oa t. SO-249/BO-12 Corrective
actions improved mgt controls mere implemDnted Radiation
protection training clas-sec were held for contractors
REED, C Commonwealth Edison Co BO/06/13 6pp
SOO71HOS09 Notifies that time clock oF Item 2 of IE Bulletin 00-17r
"Failure of Control Floda to Insert During Scvam at DWfi, "
Will start at IS Ol AM on 80O7OB Test should be completed
fifcMn 20 dau.5 JfequeBts notifirfltion of malfunction
HEPPLEFI.J 0 Region 3. Chltaoo, Office of the Director 80/07/07
B0073S0641 F?«sponH& to 1C Bulletin 80-10. "Contamination of
Nonradioac live Sy-B & Resirlting Potential For Unmoni tored,
Uncontrolled Release of Rat) i tract iv* tij to Elnvirnn " Any
affected sys mill bo restricted if contamination founi)
PEOPLE'S, D L Common wealth Edt3On Co 80/07/07 3pp
BOD7250&30 Forwards response to IE Bulletin 60-11, "MaBonry Mall
Dei tan " Requested i nveot igat ion not performed at Drotden,
Unit ! due to eitended outage Requirements uilll be mot prior
tp startup U/o oriel
PEOPLES, D L CoirmoiHueaHh Edison Co BO/07/07 2pp
(3007230636 Forwards response to IE Bulletin 80-OB. "Eiaralnat ion of
Containment Liner Penetration Held: " Hrosden Unit 1 deslflns
ulll be revieued !< feasibility of performing radlographic
e laminations uill be assessed before unit returned tu eve
PEOPLES, O L Commonwealth Edison Cn 80/07/09 Vpp
Forwards IE 1-nfo Notice HO-Bt, "Evaluation of Contractor
OA Programs " No written response rpquired
KEPPI.ER.J fi Region 3. Chicago, Office of the Director
800714030? Formal rls IE Dullelin 80-14. "Degiodation of CUR Scram
Discharge Vol C.jpatility " Written reBponsc required
KEPPLER,,! 0 Region 3, Chicago. Office of the nii-cctar 60/06/12
80071&0&30 Responds to IE Bulletin SO-17 re results Df tents required
by Item 1 No significant amount of water in scram discharge
vols Vent & drain lines also verified free of obstructions
bij performing dynamic air test
F Commonwealth Edison Co 80/07/10 3pp
80073IO4BO Fortjards Final inservlec map rept for 800103-0424
insp of raactor prem'sure vessel d primarg «ys piping
STEPHENEDM, D B Cotnirc-nuieal th Ed i son Co SO/07/10 Ip
fl007IOOOtM Forwards t eapons-e to IE Bulletin BO-09. "Hydra ran tor Attuetoi
Deficiencies." No saFetu.-r-ol fltod sys or component at
Uresilen 3 & 3 uses AH-fO or HH-90 series, hij-dramotor
PEOPLEB.D t Cofprnaninea] th Edison -Co HO/O6/16 3»p
(3007030037 Foruar-ils IE Bulletin BO-IS, "Po&sllle Losr. of Emergency
Notification Sys (THS) W/Loss of DffBlte Puuer " Written
response required
KEPPLEff, J G fleonon 3, Chicago. Office of the Director 80/06/13
IP
900723037] FormardK IE Insp ReptE fiO-tllo/BO-lOj 3O-,?'!//SO-0? *,
30-247/80-13 on SOQ505-P9 *• notice of violation
HEISHHAN.R F nejuon. 3, Chicigo. Realtor tlperations Nuclear Support
Branch GO/Oft/l? 3pp
— 8Q0723O379 Notice of violation from »nsp on SOOTOS-29
» REgnon J. Chicago, Office of- the Director DO/OSi/19 Ip
--8007a303BB IE Insp RcptG 50-CHO/HO-10. 30-2J7/BD-09 t< SO-349/BC—13 in>
BD090D-27 HQuromnl lance noted f till urn t-o report events in
accordance ui/Tech Specs
9rt!lKER,J L , BPES3<1F!D,R 1 Fleglon 3, Chicago, [Dfflco of the
Director DO/Oi/19 "3pp
BO07020SB9 Foryairts IT Circular BO-15, "loss. oP fifacioi Coolant Pump
Cooling *i Natural Circulatiun Cootd'iuTi " No written re-spouse
retioired
KEPPLE[t,JG Rtflinn 3. Chicago. Office of the Director aO/06'30
— 8007310186 Final in-service Intp i-cpt for B00103-0421 Inservici
reactor protBUT? vessel b pr-imarg eys piping
« Commonycalth Edison Co BO/O7/1O S7pp
losp of
B0073004H5 Responds to IE Bulletin 79-14, "Seismic Analysis for As-
Built Safety-Related Piping Egs. " by forward infl "Procedure
For Revleu % Resolution of As—Quilt Deviations" & "Procedure
for Application of Blume Curves Criteria "
JrtNECEH.R F Commonuiaalth Edison Co BO/07/16 Ip
— 300730Q49B ''Etiglneerinif C-riter ia/Proc-edure fni- Review t. Resolution OP
As-D-uilt Deviationsi" IteviGion S
SNYDER.T K EDS Nuclear, lur 80/O3/07 llpp
— BQQ730Q50B "Enflineering Criteria Procedure for Application of Glume
Corves Criteria "
SNVDER.T K EDS Nuclear, Inc BO/O3/07 20pp
O007E*OE91 fltk receipt of BOO(bl3 1 tr informinj NRC of steps taken to
correct violations noted in IE Insp Rept 90-249/80-09
KEPPLER.J G Haginn 3. Chicago, Office of th* Director BO/07/17
~8001724029a fleapornlE to NRC 900426 Itr re violations notBil in IE ln«p
Rept 50-249/90-09 Corrective actions veactor water cleanup
viator hammer dafnaje repaired & control rod drive sys seismic
design proved adequate
PEOPLES.!) L CoramoniiiPHllh Edison Co 1 BO/06/13 4App
DOCKETED ITEMS
47
R Periodic operating reports !i rel.itud correspondi
M Antitrust
BOO71S0333 Forwards monthly operating repts for June 1990
BTEPHENBON, B D Commonwealth Edison CD BO/O7/Q9 1 p
HOO7150/19 Re>'_.coTi<,P stating nn objtrlmn Ki Orlando Vtilt Cnmn
BQ0620 withdrawn! of i ntei vent i on FL Cities H00707 comments
— B0071B0336 Monthly operating repts for June ItBO
CIE97IEWICZ,8 Commonwealth Edison Co 00/07/02
DEWEV, L <5 Antitrust Di
BO"!?/! 1 4ni
Reportablc otcurrences, I.EH* d i plated c nrr
B007320495 Forwards LER B0-036/0-!l--0
STCPHENBON, B B Commonweal th Ellison Co BO/07/09 Ip
— 8007330459 LEg BO-026/03L--0 on BOOfa3Oi .ibnormal amount of water mas
being added to sgs Caused by thirteen leaking tubes Tuhca
mere subsequently plugged
» Commoniuealth Edison Co SO/07/09 Ip
0007220577 Forwards LER BO-027/OIT-0
BTEPHENSDNr D B Commonwealth Edison CD
— S0072205B3 LER BO-027/01T-O on S007O7. eng Ino Bring evaluation of control
rod drive scram discharge piping revealed failure to miret
FBAR seismic requirements Caused by design deficiency
Analysis performed,
HBLLAND.P Commonwealth Edison Co BO/07/14 2pp
B0072303S9 LER 79-024 has been cancelled
COLLINS, H Commonwealth Edison Co 60/07/22
P Operating license
th Spci ..hanges prc
i 1 1 tij in all modes
QO07S300'?'? lieque'.ts sub-mi ttiil r:f p.infio.5
far redundiiiiL y Hi deidij heat remcwul
at operatvon Model Tcrii bppcs whicli ii
resolution -encl FI>I ijiiid.TmF
CJEENHU7,U G Dw.&inn nf m enaing
0007010311 Fun wards Amends bB ', ^1 to LIEPHSPS DPR-31 t< DPR-fll,
respectively, safety pvalu^tinri t, notice uf issunnci' !.
aval lal 1 1 i t-y
VftROA, S A npprating Reactors Diaiiiti 1 HO/Oo/12 2p p
— 0007210311 Amends IB !. SI ti> i icDnsca BPn-31 V DPR— 51. reapct lively.
incuTporcitiny results uf revised FCCB ariijlyrii& fnr steam
goneratar plugging It-vel of y:5'/. !, permittiri!) rontinucd
operation of Unit 4
VftHGAi S A nffiLt tip HotlEav Reactor fiegulation. Diroctor
BO/Oi/ia 15pp
— S0072IO319 fiafoty I'valustinii supporting Amends 'JB t. 51 tu Licenses
DPH-31 6 UPR-ll. roepBC tivolij
ft tJPfict of Nuclenr Henftnr Hogulatioiii Director
13pp
DOCKET 50-230 TURKEY POINT PLANT, UNIT 3
C Utility Environmental Report (CR), amends l< correspondence
— BC0721O323 Motito of isDU^nt
Licenses DPR-31 ^ m'H-11. reipectivnlij
VARGA. B A Opeiating Renttnrs Branch 1
vfn Jafc i H ly of Amend 4 5B li 51 to
tivnlij
/Ofe/ 12 3pp
B007290106 Forutards Waste Packaging Insp Rept
300603-06 Ha noncompl lane e no tat)
STOHHiJP, Rogion S, Atlanta, Fuel Tor i U ty Si MnteriaU Bafetij
Branch BO/O6/50 3pp
--8007H70410 Waste Packaging Insp Rept 150OOOO39/80-OB on BOO603-06 No
noncompliance noted Major areas Inspettod cnmpliflnce ui/DOT
b NriC regulation^!
TflDUP.O L - MACARTHUR.T C Reg ton 2. Atlanta, Fuel fflcility !.
HatoriaU Safety Opancli BO/Oi/20 6np
F BBCUrltu, medical- GmergDncy (• Fire protection piano
B00714031B Summary of B00619 neoting u/util in Bethusifa.MD re propDUdd
App R to lOCrRSO on ftre protection
SnOTENHUIS.M Opflrating Reactors Branch 1 SO/06/23 Hpji
B007I1011?1? Advises NRC that NUHEO-O't/B ruqutremont tu measure chlnn
d dissclvcil gdsua in RCS Pent-wing accident is CICCQSIVO I,
involves ujinBCes sat y peraonnol eiposurt to radiation
neque5ts tJicit MRC reconsiiltr posititin
UHR10.R E FloTifld Pauicr ti Light Co BO/06/27 Ip
BQ070HOMQ Req.uofit5 permisfiion to flplisy schodult'd shutilouin for slearr
generator tnsp until BOlOOt Dctlaij nuudPil to nccomodate peak
i-oad demand For Jul -Aug 11BO Updated generating capacity,
eipoctod load demand info J, Class 111 Pue enr 1
UHFUG.H E Flundvi Pomer •< Light CD 00/Ofi/3O 12pp
BO0728QOOS Itonuestb «wumitta] of aiiplitetinn, for amend to liEcnse
conaisttng nf Tech Spec changes. !< license conditions PWR
Hndel Terh Spurs ?i Mndol lirense conditions for TM1-2
LBSBDHS Learned Category A items enr ] For guidance
EI6CNHUT.D Q Division of Lirpnting 00/07/02 6?pp
BOO7H301'ia Foruarils facility evacuation time ostlmates in rnsponio to
NRC 791129 request
UHRIQjR E Florida Power f> Light Co BO/07/17 Bpp
Q007230434 Foruiard» facility evarunllon time nstimatifi in rBsponnD to
NRC 7911H1? request
UHRIQ.H E Florida Poiusr ti Light Co 8O/07/17 7pn
Q Ad jud Icatory correspondence
0007110261 Notifies that eummi Imi-nt Orile fnr cnrnpletion of plant
parameter display in intHiim technics 1 support c tr is
reviaoil to BOOB3I
UIIHIO. R E Tlorlila Poiuer t, Light To BO/07/03 Ip
0007110236 Advises that WpstinghoiiiC =,utmittal of HCrtP-9749 !i
WCAP-?7rt'7 camjilL'tes ljh^&e L asiymiuwtr i c LDCA Igadi analysis
HCAP-733B !. WCftP-^S^O jiro'.ide add I info rpquBEted at 600326
meeting
UHRIO.H E Florida Pounr t, Light Co BO/07/07 ?pp
8007070279 Reiiuettt permission to make comments at hearing to b-e held
in Miami on steam 9 en era tore repair
PETERSON,A F Affiliation Unknouin 80/O6/S4 Ip
8007310S43 Formards Commisiian BOO537 memDipandum & order containing
decisions on UC9 780502 petition For reronsidoroti nn of
780413 memorandum & order UCB 771104 petition sought action
re fire protection for electric*! cable*
EISENHUT.D Q Division of Licensing 00/06/39 B<?pp
BO 07070 074 Advises of NRC estimates that DES re pruponed amands to OLs
permittino steam generator repair, ul II bo istue-d by B009O1
, a< FES by aoiaoi
GOLDBERG, S C Hearing Branch 2 BO/07/DS Ip
H General correspondence
80D7160BOS ForuBrds response* to first 31 queitlons raided in B004O3
correspondence re faci 1 ity. Includes two pertinent repts t<
one page each from facility Tech Specs ti flTB Remainder of
question! mil) be answered at later date
VAROA, S A Op&rsting Reactors Branch 1 BQ/Q6/3fl Bpp
BO07190710 RcHponds to MRC bOO&lf request rp endaiigerpd, threatened or
proposed to be lifted spoticn in pl.mt ari'B Jaeksonvi 1 le
ofc mill proviJe li^l after review Advise? of change in
consul tat mn procedures
8TIEOL17i!iM D Jntenor-lH^L of, fr'isli !. Wildlife Service 30/07/Oa
app
B007ai036tl Rcsponas to HRC B006111? Ur le util 01 amend request Provides
list nf potentially threatened J. undangered species 111
proiimity to Facility Compli-te biological assessment shouli!
be provtiied Outlines info tu bo incluUcd in assessment
HAfJKLA.D J InlHrtor. Dept i>f. Fish St Wildliftf Bprvice BO/07/14
3pp
B007220390 Advlsu-i that Henry Prati < n toiqi'" I- strE'.B analijsrs re
containment purgu h,i-ve bofn delated Upon (ompletion !.
receipt of snalitafi. uti 3 will rtwieu !. prepare i esponie
dumonatrating valvn ahiJity tu clnne during DffA-LDCA
UHRlQ.fi G FloT»<lf» Power S. I ight C» BO/0// 1 'i Ip
Q007300'567 BuflimaTij of 800630 mer.tinB lo/all r
repair program re ove-rvieuj nt evert 1 rhrnntil
GROTENHUIS. M OpPrBtiny Ruitor', Uiflinh 1
team generator
3pp
48
DOCKETED ITEMS
8007280531 Forwards responses to questions re proposed installation of
condensate polishing demineral i ier* Response-* suppl Info
previously submitted in BOO31B & O327 Itrs Overalls
drauings enc 1
UHRIO.H E Florida Pniuer !. Light Co HQ/07/32 Biff
8007830243 Forward* IE Bulletin 80-16, "Potential Misapplication of
RossHount Inc Motfels 1151 It 1132 Pressure Transmitters
H/Eitner A or D Output Codec " Written response required,
IE Circular BO-16 also end No, written response required
O'fiElLLY.O P Region 2, Atlanta. Office of the Director BO/06/87
— B00728Q551 "Sys Flow Diagram ConderiHate Polishing Deminerali ler BIJB
» Bechtel Corp HO/OS/02 1?
~a0072BQ39(, "Site Plan "
» Bechtel Corp 7i/09/ai
BQ072H0562 Responds to H00530 Itr requesting info on auxiliary
feeduater sg s Attachment 2 providos add! Info to suppl
791320 response
UHHIG.R E Florida Power fc Light Co BO/07/S2 7pp
B0073IO377 Informs that American crocodile (. bald ea-gle inadvertently
omitted from BOO714 endangered species list
OHERHEU.J C Interior, Oept of. Fish b UilJlife Service BO/07/25
8007210064 Forwards tuo vol Phase II response to IE Bulletin 79-0 IB re
environ qualification of Class IE aqulpment Supersedes
B006Q2 Phase I response. H/o end
UHRIO, R E Florida Pouar !• Light Co SO/07/03 2pp
B007 160373 Advises that addl Info re inservice insp mill be submitted
by BOQ913 per NF1C BOD414 request
UHRIO. R E Florida Power & Light Co 80/07/09 lp
0007230283 Respond* to IE Bulletin 80-11. "Masonrij Mall De*°ign " Rapt
not complete but »af etu-related ualls have been identified d
re-ovaluatinn progran developed fl»pt uill be lubmittad by
B00723
UHRIOiR E, Florida Power l< Light Co BO/07/09 lp
Q. Inspection reports, IE Bulletins & correspondence
BQ07240aOi Forwards IE Info Notice BO-2O, "Loss oF Decag H»at Removal
Capability at Davis-Hesse Unit 1 While ID Refueling Made."
No response required
Q'REILLY.JP Region Si Atlanta. Office at the Director QO/03/OB
8pp.
B00702O231 Forwards IE Info Notice BO -32, "Breakdowns In Contamination
Control Programs " No written response required
O'REILLY, JP R*gion 2. Atlanta. Office of the Director BO/O5/B8
IP
B00730O55B Advises that final response to IE Bulletin 00- 1O uill he
lUbaitted by BOOQ01
UHRIO, R EL Florida Pot.tr b Light Co BO/07/O9 lp
B0073100Q4 Advises that full rasponsc to IE Bulletin BO-OB uill be
submitted lg B01O31
UHRIO, R E Florida Paver & Light CD BO/07/07 lp.
8007240261 Act receipt of SOQ6B6 Ifcr informing NHC of »t*ps taken to
correct violations noted In IE Imp ReptB 30-890/QO-1& h
HO-2S 1/80-1 4
LEWIS. R C Region 2i Atlmita, Reactor Dpirations Nuclear Support
Branch. BO/O7/11 lp
B0072104SB Forwards IE Circular 80-13, "Grid Strap Damage in
UntinghDuae Fuil Assemblies " Mo written rv&pun^t required
D'ReiLLY.J P Region 2, Atlanta, Office of the Director QO/D5/28
IP
-8007210243 Respond* to HRC a DO 529 Itr ft violations noted in IK tnvp
Hepti 3O-250/BO-16 tc 50-251/BO-14 Corrective action* tracked
apin noncompliance lte«i & hired 4ddl QC personnel
UHRJO.R E Florida Pn»»r & Light Co B0/06/2i, 3pp
80O701030i Forwards IE Info Notice BO -23, "Luis of Suction to emarganc
Ffsduater Pumps " No urlitcn resp-ontB required
O'REILLY. J,P Region S, Atlanta. Of 'fits of the Director BO /O 5/29
IP
9007340266 FnrusrdlB IE Imp ReptB 50-B30/BO-16 & 30-251/60-14 on
800401-30 ti notlcia of violation fc deviation
LEMlSiR.C Region 2, Atlanta, Reactor Operation* Nuclear Support
Branch GO/03/29 3p.
8007100128 Foruard* response to Itema 1,2 tc 3 of IE Bulletin 79-O18,
"Environ Qualification op Class IE Equipment " '
UHRIO, R E Florida Paver b Light Co 80 /O 6 /OS
B007330062 Poruards IE Info Notice 90-2t, "Evaluation of Contr*ctor
OA Programs *' No written response required
Q'REILLY.J P Region 2, Atlanta, Office of the Director 80/06/10,
2pp
8007160265 Forwards IE Info Notice 80-27. Degradation of Reactor
Coolant Pump Stud* " No specific action or response
required
Q'REILLV.JP Region a. Atlanta, Office of the Director. BO/OA/il
IP
S007O20732 Forward* IE Bulletin 00-13, "Possible Lois up Emergency
Notification Bgs (ENS) MVLoii. of Offiite Pouier " Written
reiponse req.uireil
O'REILLV.J P Region 2. Atlanta. Office of th» Director BQ/Qt,JlB
IP
— BQ07S40272 Notice of violation from insp on 800401-30
* Region 2, Atlanta. Office of the Director BO/O3/K9 lp,
— 0007240376 Notice of diviatian from Insp on 800401-30
* Region Si Atlanta, DPFiq. of the Director BO/OS/S1? lp,
— H007H402ai IE Insp Reptl 30-830/60-16 b BO-291/BO-14 on BOO401-3O.
Noncompliance not»d: -failur* to track implenentatlon at
coTTBctlv* action b to meet corrective action deadline,
VOOT-LOWELL, fi J Region 2. Atlanta, Office of the Director
MARTIN, R D Region 2, Atlanta. Reactor Operations Nuclear Support
Branch, BO/OS/29 6pp
R Periodic operating reports It related correspondence
8007240079 Forwards semiannual radioactive effluent & environ
Monitoring rapt* for Jan-Jun» 1778 H/o environ monltorino;
r»pt
UHRie.R, E Florida Pouier tt Light Co 79/08/30 lp
B0070204S4 Forwards IE Circular BO-13, "LnB* of Reactor Coolant Pump
Cooling & Katural Circulation CooldDiiin " No written response
required
O'REILLV.J P Rug Ion 2, Atlanta, Office of th« Director BO/06/2Q,
8007I0003B Fo.rui»rda refiponne to IE Bulletin 80-04, "Engineered Safety
Features (ESP) Reset Control* " Lists equipment which does
not remiln in emergency npda upon met of EBF sijnal,
Follouiup re'Bponse uill ha Kent by BOOB01
UHRIQ.R.E. Florida Power (> Llflht Co 80/O6/20 4pp
S007170109 Forwards IE Clrcul«r HO-14, "R4dlaactive ContaminBtion of
Plant Demlnaraliied Watar Sy* b Resultant Internal
Contamination of Personnel " Ha utritten ruspon** required
O'REILLV.J P Region a, Atlanta. DPPice of the Direttttr. BQ/Oi/24
lp.
—B007a400ab "Bemlannu»l Ftad Inactive Effluent Reptl for Jan-June 197B
* Florida Pouir & Light Co. 7B/OS/30, i9pp
B007220943 Forwards "Beml annual Radioactive Effluent R»pt, « fc
"aemlannuual HonitorlTtg Rflpt. " for Jul-Dec 1970 per Tech
Spec i, 9, 4
UHRIO.R.e Florida Pnunr l< Light Co 79/03/01. lp
— 8007220530 "Semiannual Rapt of Radioactive Effluent Releases, " Jul-Dec
1978
» Florida Power & Light Co 79/03/01 23pp,
BOO7340174 Forwards north lij apcratiiig repts for June 19SO
BCHMIDT.A D Florida Pouer & Light Co 80/07/08. lp
— -B007240177 Monthly ojiftratino Tepts for Jun« 19BX)
CHlLSONiV. T Florida Poumr & Light Co BO/07/03 lopp
DOCKETED ITEMS
8 R»port«ole occurrences. LERs t, related correspondence
0007320119 Forwards LER BO-011/OJT-0
SCHMIDT. A D Florida Power (, Light Co BO/O7/1O Ip
— BQ07320421 LFR BO-014/O1T-0 on BO0636. AE advised that insp/eva) uatior
in progress per IE Bulletin 79-14. revealed deficient!)
involvino auxiliary feeduater sys pump suction piping Cause
not stated
PACE.P L Florida Power t. Light Co 80/07/10 2pp
-BQ072103I4 Amends SB t, 51 tc Licenses uPfl-31 ', DPfi -4 1 . respe 1 1 1 Vel y ,
incorporating results of rc-isr-al FCCS analysis Fni steam
generator plugging level I'f ?5/ E< peimitting . or.tinued
operation of Unit 4
VAFJGA.B A Office of Nutltur Heat-tor Kegulfllion, Director
30/06/12 ISpp
-"007210319 Safety evaluation supporting Ampnds b9 ', 51 to Licenses
DPR-31 tc DPR-41, respectively
* Office of Nuclear Realtor Regulation Director BO/Q6/13
ISpp
DOCKET 30-251 TURKEY POINT PLANT, UNIT 4
C Utility Environmental Report <ER). amends !i correspondence
BQO739O406 Forwards Waste Packaging Inip Kept ISOOOtm/BO-OB on
SO06Q3-0& Nil noncompl iance noted
8TOHR.J P Region S. Atlanta, Fuel Facility E, Materials Safety
Branch BO/06/2O 3pp
— 8007310323 Notice of issuance !< ,-ivs i lah i 1 1 ty of Amends 5Ei J. 5L to
Licenses DPH-31 t, DPR— 11 . respect i vely
VARGA.S A Operating Reaitois llr.inch 1 QO/Q6/I2 2pp
B007110199 Advises NRC that NUnfer,-O578 ie[|u.iemi
& dissolved gases in RC5 following sicideirt is
involves unnecessary personnel e<pot>ure tcj IE~U
Requests that NRC reconsider position
UHR1Q.R E Florida Pouer '. Light Lr, HO/Q6/S
sure chlorides
— BO07390410 Waste Packaging Insp liept 150000039/80-08 on 800603-06 No
none Dmp 1 ianc e noted Major areas inspected compliance u/DDT
& MRC regulations
TRDUP.Q L , MACARTHUn.T C Region 3. Atlanta, Fuel Facility &
Materials Safety Branch BD/O6/20 6pp
00072501)01 Requesis submittal of application for amend to 1
consisting of Tech Spec changes •< license conditions PUR
Model Tech Specs !. Model liteime conditions for TM1-2
Lessons Learned Category A items eni 1 for guidance
EISENHUT.D G Division of I uprising SO/07/tV 69pp
F Security, mndicalr emergency !, fire protection plans
HOO714O5IB Summarg of 800619 meeting y/util in Bethecda.MD ro proposed
App R to lOCrp-iO on Fire protection
QROTENHUI9,M Operating Reactors Branch 1 BQ/06/33 3pp
BOO723O442 Foriuards facility ovacoatiDn time estimates in response to
NRC 791129 request
UHRIC.fl E riorida Power t. Light Co HO/07/J7 Bpp
B007I10261 Notifies that commitment date fur rumpUtion of plant
parameter display in Intel im tpchniral support L tr is
revised to BOOB31
UHR1G.R E Florida Pnmer '. Light Co aO/07/01 Ip
8007110256 Advifies that Uest ini|h(iu^u' lubmi ttal of WCAP-974S (,
UCAP-9749 completes Phase C aEiijmmEtric LQCA loads analysis
HCAP-955B t, UCAP-9570 provide ,iddl info requi-sted at 800326
meeting
UHRIQ. R E Florida Pouer •. Light Cn HO/07/07 2pp
BOO723O454 ForUiards facility evacuation time estimates in response to
NRC 791137 request
UHRIO.R C Florida Powar !. Light Co BO/O7/17 7pp
0 Ad jlfd icatorij correspondence
B007150710 Responds to HHC BOOMV ruquest ie endangered , threatened or
proposed to be listed spncies In pl«nt area ,Mc fc Eonvi 1 le
ofc mill provide list aftel revi«<u Advises of chdnqe in
consul tat ion procedures
STIEGLITZ.W D Interior, Dopt of. Fish t. Wildlife Service 60/07/OB
2pp
3007070379 Requests permission to mate comments at hearing to be held
in Miami on aloam generators repdir
PETERSON- A F Affiliation Unknown 80/06X54 Ip
BOO731O243 Forwards Commission B00527 mcmnrandum !. order containing
Jeicisions on UCS 7B0902 petition for reconsideration of
730413 memorandum & order UCS 771104 petition sought action
ro fire protection for electrical cables
EISENHUT.D 0 Division of Licensing BO/O6/35 B9pp
HOO7O70094 Advises of NRC ostim.iteE thdt DES re proposed amends to OLE
pormitting steam generator repair, mill be issued by B00901
tc FES by BOiaOl
GOLDDERO, 0 C Hearing Ilranch 3 BO/07 /O3 Ip
General correspondence
BOO7160BOB Foriuards reGponaes to first 31 questions raised in BOO403
carrespondEnce re facility Includes two pertinent repts &
one page each from facility Tech Sppct. d STB Remainder of
questions lui 1 1 be ansuiered dt later date
VAROA, S A Operating Reactors Branch 1 BO/06/24 Spa
M Antitrust correspondence
6007310169 Responds to NRC B00619 1 tr re util PJL amend request Piovides
list of potentially threatened t, endangered speiiei. in
proiimitij to facility Complete b i ill IIQ it al assessment should
be provided Outlines info to be included in assessment
HANKLA.n J Interior, Dept of. n«sh 1 UsldliFe Servico BO/07/14
3pp
B0072203BO Advices thai Henry Pratt C» torque J, stres'. analyses re
containment purge have been diilciijpd Upon completion f.
receipt of analysesiutil unit iuvieu!i prepare ipsponse
demonstrating valve ability to close during MA-LCICA
UHRIO.R E Florida Power i: Light Co 00/07/15 Ip
8007300567 Summory of BOOA30 meetiny nj/all levieuit-rs on steam genor.itar
repair program re overview of evpnt thronulonu
GROTENHUIS.H Operating Reactor? Brand, 1 SO/O7/16 3pp
00073 SO 93 1 f- or ward K responses to questions re pi oposed installation of
condensate (iQjishiiifj demineral i j el s Responses suppl info
previously submitteil in UOO11I! 5, O527 Itrs OVPTSIIP
drauings end
UHRIG.R E Florida Pouier !, Light Co B(l/07/3r.' 31pp
— ^0072H03'il "Sys Flnu Diagram C.ondt'!is<ito Polishing Deiri neral i I er fiye "
» Bechtel Corp BO/03/Or.1 Ip
BOO? 190719 Response stating no objection to Orlando Utils Commission
BOO6HO uiithdraual of intervention FL. Cities B00707 rommenta
re enual treatment mill bo addressed in Unit 2 antitrust
proceeding Certificate Bvc end
DEWEV.L B Antitrust Division 80/07/11 4pp
p. Operating license stage documents & correspondence
—8007200956 "Site Plan "
« Hecbtel Corp 76/Q9/?]
BO 07 30 0 'Si 3 Responds to BD0330 1 Lr requesting info on aun
feeduiater sys Attachment S priividt's ,iiJ(ll info to supp)
79122O response
UHRIO.R E Florida Power !. linhl to BO/07/22 7pp
BOO7H3O099 Requeots submittal of proposed Tech Spec changes providing
for redundancy in decay heat removal capability in all modes
of operation Model Tech Specs uihich would provide acceptable
resolution encl for guidance
EIBENHUT, D O Division of Licensing SO/Od/ll 62pp
B00731Q377 Informs that American criicodllii Si b,,ld engle inailverten t ly
omitted from 800714 endangirod hpetits liit
OBERHEU.J C Inter ior, Dept of, Fish '- Wildlife Seivire BO/07/25
Ip
BOO721O311 Forwards Amends 3S (< Si to Licenses DPR-31 I- DPR~4t.
respectively, safety evaluation t> notice of tGsunnco !<
availabilitu
VAROA, S A Operating Reactors Brunch 1 QO/06/12 2pp
-is., ]i- uuiitfti
!nf<i tJfili
EK1-IV. "B»e.iiccloLiiri5 In CiiriUminatior
00/0?0."!J F on.1,-11 d
Contriil »'T llji am', ' Ni: uiiitti'n i fnp cin^t roquliert
O-nll|,lV,J I1 Hey ion .?. Atltint,!, [Jfftin of tt.D Dii-L'Ctot nO/O5/2£!
IP
iSO-l'l, "C.rvrl Str«|! Uamage in
' Nu IIIT ill tMi T«^iirii(6e rciiiilrei)
•itu. llffne i,f tlic Oirt'ttor OO/O'i/HB
IOO7OK)rOh ruirwitiMlii 11- Intrt Mnliru HO-;?3. "I us* of butt ion to Emergent
rotfdiu.i lei F'ujnpi. " tip uiiiltoii r L>tp »nsi> required
d'HEILl Y. J f1 lii'fjinn ?, Atl.tnl.1. tiffin- n f the D(ruttar 00/O5/29
HlO/LOOOftS FBI aid* 11 Iiisp Rent 'iCl-rT/l /EllJ-lft on WlO'H't-lA
Mu no<i t omp 1 i ,ni(.e imteil
HURI'HY.C E Rryiifii £> Atlont.i, Itoac loi Construe turn !, Engineering
fiuppiirt IJiNiich Q0/flr)/a9 .'pp
lngp lippt 10-r"j|/HO-lA on HOdSIB-lft Ho notiromjiU»ntB
notoii riiijur .Ji ear, JiuppcLei! iti-.un gnnmtnT FoeduiiLer lino
riiiJlogrpiplnj [ipr IE- Itjllplin 7"?-13
HE fU>1 1 A n rioijtiin J, Atlnntri, l(c-i(ti>r Cnna trur lion !< Engi nenr i ng
Uticpiirt Branch riltlWl E V, ft Fl Flo 9 ion ?. Atliint.) nfflrc oF the
000/IOOtaf) ForniflTrt--. rpipanie tci I ti'«ns IP.' I. H nF IE nulletin 79-OIB,
"knviicm (lu.il if Ucittnn nf Cl.n,-s 1C I-.qu i p men t "
(JHflle, H i I loriit« i'liuior F, I mht fn flO/Oh/Or1 (=00pp
OtWaonfiE' I m
Oft Proj|Tfnnri
Cl-RCILI /. -J t'
mi tit It Infn Nu 1 1 c o tll)-?^,
1 Nn uiittnn i t"pp mist' rncju
"E Jfl 1 uat i on uf Ciirttrattnr
SO073502O2 nct|>un.Js to IE Dullftin BO-1 1 . "Masonry Hall Design " Ropt
not complpto- but tof ety-rc lated uiells have bif-en identified t,
re-ova lust i on pi Ojjram develapeil Rept uilj be submitted bi(
BOOTHS
UHtHO.R E Florida Power f. Light Co BO/O7/O9 Ip
B0073003LU Advises th n t Final ussponsc tn IE Bulletin GO-iO will be
submitted bij BOOB01
UHRIQ, II C Flortd.i Poiuer !c l.ig^ht Co BO/O7/09 IP
BOD73l(JOt)1 AOvisoB that full response to IE Bulletin BO-OB mill bo
aubmifctetl bij OO103i
UHHIOiR E Florida PDuer >, Light Co BO/O7/0-? IP
•3007240241 rtt k receipt op SOOii^fi 1 tr Inf OMnirfl NRC of stops taken to
correct violations noted in It Insp Fiepts SO-550/BO-16 t-
50-aSI/BO-lfl
LEUIS.R C Uegioit 2, Atlanta. Reactor Operations Nuclnar Support
Branch 80/07/1 1 Ip
— Q0073flOad3 Hff5p(iiiOH to NFIC H0052^ 1 tr m violatians noted in IE Inap
Rnpts 50-r>!JO/HO--l(, !< 90-231/80-14 COT-T-BC t we octioiiH trackad
open nontnmp 1 i^nce items d hired add 1 OC persoi'iiel
UHHIO.Fi E Florida Pauer !- Light Co BO/Oi/2i 3pp
— nQQ724Q2bl> FomjardR IE Insp Rapts 50-350/BO-1A f< 50-351/80-11 on
QQ0401-3O ^ tiDtitet, of violation t, deviabion
LEM13.FJ C [legion 3, Atlanta. Ftoactor Operatinns Nuclear Support
HroTicti BO/OS/2'? 2p
— 80072^0^75 Notice of violation From inep on 900401-3O
o Ftegifm a. Atlanta. Office ot1 the DiTector ao/09/29 Ip
— aOQ724D27i!i NotiLe of duviatlon from insp on 800*01-30
* Region 2. fttl.-ints, DF*iCB of tha Director 00/09/29 Ip
— B00734Q2B1 IE Insp Flepta SO-250/BO-1 h t: SO-231/HO-lfl on S00101-30
Nnncomp 1 ianc e noted Pailut-o to track i mp 1 fomentation nf
cnrructiva action & la meet corrective act (an dnadlina
VOOT-LDHELL, II J Region 2, Atlanta. Office of the Director
MARTIN, It D Region 2, Atlanta, Rpaetor Operations Nuclear Support
Branch (30/OVB9 6pp
l-tiiwui dn It- liifu fJnilcr HO-!1 7, "Degr.iil o t tun n f Hcuctor
Cualaiit 1'iimp lilitd* Mn aurciHlt. -fii titin nr rDGRmii.B
roq.uiroii
O'RCIUV. J P iU'-giail I1, rttliintdi. !!C f i in n r tho Director ftQJQk/\l
IP
n(l(J7().107S;j Poiwjrm IP liullotii) HO-lii "F'tistlhl* LOSE Of- Cmerg"1"^
Motif iiolion '.iijfi ITNR) U/l im i. n f (JFf-,it.«. PCMUCT » Writtoii
r-enDiiiL' r«aulrnd
l> (loijinn 2, Atliint.i- OffUl- of the Uiroctar HO/06/1E1
I ur-wni 4lt It- (irculir HO-i1,), "loor. of Reattup Corilnnt Pump
Cooling !. tlntiiTfll r )n iiliiliun < iinMiiutn " Wo uritten riitfunge
roqu irod
O'FIEIIUY.J P Iti-ijinu n. WMiitn. (Iffiru iif tlio Hin-clnr
IP
Foruaiil^ i«'.(iniiBe In 1C pultutin IIO of>. "Eng i nuoroi Siifetg
Foatliru'R (FID Hc«* t Control-, " I I &te i'qutp«ient uhtth doorj
not riimflin in iTtiunj H«CIJ moilti upon rD°>el of ( Br tugnnl
Follouup mnpiPiiup will IIP t>on 1 In] (100IKH
UlltUO. II I F-li.rl't.1 Pnwor '- light to HtVOfr/'.'C) flpp
QOO/1 /01C'' roruards IE C'lrruJor H0-14i "l(;id J oott i vi> rontaiHination of
Plant 3>i-inlnerjliiiiiJ V-tntcr hyn ti Rvool t..nt lntorn.il
•Toiitilmlniitiiiii "f ('emimnel " Mo luiiltcl" mQpnnse required
O'RHtiy- J P fteo>nn a. All&nlo. (IffUn nf the [Hroitor HO/06/J4
IP
B007iX30:"S.l Fnnunnl-a IT Dullntin HO- Ki. "PotcnUnl Hifun-ppl icati on of
Roaemnunt Iiu Mrdcle 1131 !< Hi!' (=1 uiEiirc Trnnami tier t.
W/Gitlier A or- n Output CDI!*I " Vtt illcn rusponnc ronipirnd
IE Circolor HO lit »U<> one I Nn ufitlfn ro" uonie i-oriuitrctl
O'fiEII I Vi,i P Hfflplnn 2. Mlsntj). fHlika cf the Direttor BO/Oft/27
IP
0007S100A1 lorwiiJiile tun vu I t'tuoic |3 iitsiioni.e to I! llullctln VV-OJB re
onwiicin qualifiiiit mn of Cl«««. IP i ititinment SiuporRUilea
i)00ftt)3 Phai-e 1 ruoponsB W/n pni.1
UHRIQ n F h'lnrlilJ F'ouirr *, I inht Ld B(l/O7/0'j ?p[>
R I'ei-iudic operating reports t. related c orr espundEnce
8007210075 ToriuurdE semtatinual radi oact i vo oPfluont ti environ
monlturlng I'Opts for Jan-June 1979 W7a environ mnnitoring
rcpt
UHF1IQ.R E Florida POUJHT & tight Co 78/08/30 Ip
— aQ072-400B<> "Semionnuiil RadlDac t ivo Effluent Repts for Jan-Juno 197B
* Florida Power *< Light Co 7a/O9/30 13pp
(30073205*3 Tol-iuiirds "Semjonnual Radiooctive Effluent FJept. " t,
"QBmiannuudl Monitoring llept, " fur Jul-Dec 197B per Tech
Spec 694
UHFUO.F! H Florida Poiuer t, Light Co 79/03/01 Ip
— RQ0723055O "Semi anting J Ftupt of Radioactive Effluent ReloaBea. " Jul-Doc
1973
ft Florjita I'muor t. Liftht Co 79/03/O1 35pp
C0072'KH71 ForiuardE monthly operating repta for June 1980
BCMMlDT.ift D Florida Poujei- t, Light Co SO/O7/OS Ip
— BOQ721Q177 rionLhly operating repta for June 19BO
i V T Florida Puuer b Liant Co 80/07/0"; lOpp
DOCKET 50-391 (lUflD-ClTIES BTWTIGN. UNIT I
F Sequritiji ned)c all emergcnrij * five ftrotce tion plans
00070103J17 Foruardi sa f-enjuar-^ & conting enci) plan amend Plan uithheld
Irof IOCPFJH 7VO)
PEOPLF8.D L ClommDnuBalth Edison Co BO/OA/27 Ip
0 rtdjuditn*iory correspondeniB
B007310H4T Fftruiarils Commi a smn S005H7 memurarmum t. order containing
dociBinna on DCS 7B030H petition for r«c.ons Ideration of
780113 muflinranduin V order UCS 771 IO1 pBtition sought action
re tire protection For plectTical cables
EIEENHUT, D Q Division nf Licensing aO/Ofa/2S B9pp
51
0 Insurance !i indemnity information
0007130616 Foruiards Endorsement h3 to NEL1A Polity NF-187
OSTER.J rommanuenlth Edison Co BO/Q7/O9 ?pp
80.07010086 Fnruidirts IE Info Hutite B0-2"j
Feediuoter Pumps No written i e<ipDti<-i< r
KEPPLfcFt J G Region '1. (hitcign, Office
ip
"I n95 of Sijitiuti
; q u i r e d
£jf IhD flji et- tor
0007290709 Forwards Endorsements 63 !< 64 to NELIA Policy NF-107
OSTEH.J Loramonuealth Edison Co BO/07/23 Tpp
P Operating license stage documents d c nrreapondpnc P
BQ07000756 formal il* revi'ui] r s^iaoif to
Qualification nf C.)25<> IE EquifiiTit'nt "
effort is conlinuiiig in ulant i f it <)tin
qualifications U/o end
JANECEKiR F Commonweal th L'dibon To
IE Rulletin /7-01B,
1 denti fit? LIT uat uiln
i ot equip merit
B00733002B Summary of B003O7 meeting ui/Mark I Dinners group in Dethesds.
Mi), re revisions to NE1C acceptance enter!* t< outstanding
Issues relative to Mark I containment long-teim pi oyr.nn
GRIMES. C T Plant Systems "ranch BO/Q2/21 31po
00072201^6 For
OA Progr-ims
KEPPLFH. J G
nrcls It Infu Notice SO-?6. 'fvaluatu
Region J ChitaijP. Office nf tliP Dli
jf Contractor
tor SO/06/10
BOQ7290517 "Measurement of Xr-l.il, C-14 f. Tritium in Air '. 1-131 in
Vegetation d Hilk Around Quad Cities Nuclear Power
Stations, "
KELLER, J H . AKER9, 1} U , DUCE, 3 U Idaho National Engineering
Laboratory FIN A-6O7B NUDEO/CR-1 19=i 90/03/31 flOOpp
H007O10190 RcBponde to SSHT concerns re cnntrol rod drive sija locking
Keiemlc onalijsUB Quad Citita 1 !. B snlsmli; design of control
rod drive oys ealculationn performei) for facility uh i 1 e
untler connt end
JANECEH.R F Commonweal th Edison Co BO/O6/M Ipp
— BOO701Ol?a "Quad Cities 1 !. 2 SBiomii Data on Control Rod Drive Bye •>
« Roactor Controls. Inc 7O/07/10 200pp
B0070701I6 Buhmits revised reBpunaes to N[(C 770603 lira re
Second level op undcrvol tape protection for 1 kV sraergency
pouer buses supplying safety-related loads
JANECEK.R F Commonwealth Edison Co B0/0i/5i 4pp
BO07140300 Forwards Amend 56 to License DPFl-a1?. safety evaluation li
notice op issuance b availability
IPPOLITO.T A Operating Reactors Branch 2 BO/Ofc/26 2pn
— 8007110305 Amend 5t to License OPR-27 authoriung operation of reactor
beijond previously np proved end-of-cgc 1 it coastduun
conditions
IPPDL1TO.T A Operating Reactors Branc.li 2 BO/06/26 Spp
— D007140S09 Safety evaluation supporting Amend 36 to LICOTIBE DPR-29
» Operating Reactors Branch 2 £iO/06/2i 3pp
B007140301? Forwards IE Diplletin BO-M, 'Di-gi nda
Dlschargo iJol Ciip.iti 1 1 1 ty " tJiittun rt'^iionse r
KEPPLEH,J G Hog inn 1, Chicasjo- Office of tti
of DNR Scram
9007100001 roruards response to 1C Bulletin BO-09, "Kg drawn tor j.ctuato
Oef it i one i DS. " No saf ety~rplateri b^i or component ctt
Dresden 2 f. 3 use^ AH-9O or NK-90 ^.eiie'', hydvamotor
actuators
PEOPLES, D L Commciniuealth CdiEQn (o BO/Oh/li- 3pp
B007030037 foruards IF Bulletin 00-15, "Pussible LOSE of Emergencg
Notification Sys (ENS) W/LOB5 of OffsiLe Pouer " Written
response required
KEPPLER..I Q Regiun 1, rhirdij», Dfficc of the Director BO/Oft/lB
IP
60070aO3B1? Formarils IE ( irculat 80-15. "Los-, of Rr>aclor Coolant Puma
Cnoling d Natural Tiiculntinn CouliluLjjn " tta ujritteii response
re^ui red
KEPPLFFIiJ 0 Region i, Chiragu, Qftiee of trif> Dirurtor 00/0^/20
BOO711O131 roruardb notice of viulation •< noticb- of proposed im
of tlvil penaltieii arising from IE flOCIl'H in^ip
STELLO.V Gpfice nf Inspection !, Enforcement, Office of the
Director 90/Ob/SQ £pp
— Q00711013fi Notii-o of violation f i urn inip un BOO 1 31 Noncomp 1 lane e noted
surface radiation uf transporting vehicle cuceedpd mnji
allomable millirem per hour
» Dffite of Inspertion fc CnF on eniLMit. Office of the Director
90/01/31 Ipp
— 0007140514 Notice of issuance & availability of Amend 96 to License
DPR-H1?
IPPOLITO.T A Operating Reactors Branch 2 00/06/26 2pp
BQ070B0063 RospondB to NRC B00515 request for add! info concerning
adequacy of station electric distribution agi volLages
JANECCH, n P Commonwealth Ed i inn Co BO/06/30 4pp
B00707O343 ForusrSE reviEod schedule d status Info for Mark 1 program,
Peeduiater sparger replacement t< general uorh planned for
Quad Cities 1 outage Proceeding on priority basis ui/mods
providing largest safety Increase margins
REED,C Commonwealth Edison Co So/07/02 I8pp
B007JOOt4H Applicatinn For amend to App A, Tech Specs of
DPR-39 ti DPR-30, imp lernentinfl fire protection mods
JANECEK.R F CommonuiBaltli EUison Co 80/07/03 Spp
— 6007110143 Nutitc of imposition nf rjvil ponaltifis hased on Item
noncompl innce re EICBBSIVP '.iiifiicf rni1|,itiBii on transport
Vehicle
« Office uf Inspection J, Enf ui Ltmenti nffitc of the Director
Ip
B007140147 Notice of proposed imiio'ii ti un of ci^il penalties in amount
of *fl,000 fnr item of nnnconip 1 lance ru radiation levels on
ujSKte Bhi pmi-nt!. eiceediiiij regulatury limits
* Office nf Inhpoction ?i (-.nf orcement-, flffue of the &irectoi
SO/06/ SO Ip
B007l70fl30 Foruards IE Circular (jn-14, "Fisdioar ti ve Contnminali on of
Plant QemineraliioiJ Wjter Sif-, ' He«nl latil Internal
Contamlnatinn of Personnel " No written \ psnnnse required
KEPPLEH,J 0 lipglon "3, Chitoqu, Officp of 'tho Dirottiir 00/06/34
— 8007100147 Proposed changes to Tech Specs 3 12/4 1S-I throuoh
3 12/4 1H-1?, implementing fire protection mods
» Commonwealth Edison Co 80/07/03 IQpp
B007210S1S Responds to HUG request For addl info re turbine disks
Applicable turbine missile analysis ua& presented in Amend
2 to Quad Cities CP application Analysis applies to Dresden
due to similarity of general arrangement
JANECEK.R F Commonwealth Edison Co BO/07/15 Ip
0 Inspection reports* IE Bulletins ti correspondence
B007140345 Forwards IE Bulletin BO-13, "Cracking in Core Spray
Spargers " Written response required
KEPPLER.J G Region 3, Chicago, Office of the Director BO/OS/IB
IP
B007230^Q9 Forwards IE Bulletin tiO-ld, "Pt.tential Misafi[>l irotion nf
llosBmount Inc Moilf/la 1131 •< 1 1 "iB Prtstino Transmi ttuv «,
W/Either A or II Output Cades " Wiitten (espouse required
IE Circular BO-16 also encl Nu mritten response reiiulred
KfcPPLEH.JQ Rngion 1, Chuau'ii Oft-icp of thn Director BO/0(,/37
IP
B007300574 Forwards Waste Pac>aq,ng Inip Kept lSOOHOilft/aO-07 on H0013I
Notice of violation foruiiirded unilor 'lepnrnte rovpi
KEPPLER, J C Reainn T, ChiC-agi,, DFfici- of HIP Director BO/Ofa/37
2pp
— B0073009B5 Haste P.iC ksj| ing Hi"|i Flept 1 100(iUt6/flO-07 on SOOIH1
Noncprnplidncp notoiJ railiatiun levols on tin (am of trailer
in eites& at regulator!) limits
DOOK.H E RBJ urn S, San Flunciscu, Fuel PuciUtiJ *, flalnr) nU
Safety Brrtncli TAIN, r U Hegion <l, Pallas, Offn e nf the
Director 80/Or!/37 7pp
8007020065 ForwardB IE Info Notice 80-23, "urea Nouns In Contamination
Control Programs " No written response required
KEPPLER.J 0 Region 3, Chicago, Office oF the Director BO/GB/3B
DOCKETED ITEMS
miOIIW N0t»f,BS that. tlme tlQLk of ,tem 2 of ,E Dul|etl
ill ." i CniitT-ol Kudu tu Insert During Scram at DHR, "
iiii 5t,yt nt IP 01 AM on BOO7Q8 Tesl should be completed
Kt
j
ChiLago, Office o F the Director
— 80072401 O9 LER 90-OI6/Q3L.-0 on 0006?] , during startup fc ihutdoun, valve
1-203-2C failed to close while testing Caused bij improper
adjustment OF eihaust rostrlctor on pilot valve Pilot valve
dismantled (< adjusted
* Cornmontueal th Edison CD 30/07/2) 2pp
07..10M1 Hes
Nonrad moti
Uncontrolled
de )o IE Bulletin eo-10. "Contamination of
Sy. * j, Hesulting Potential For Unmon i tared ,
lcate of Aailindc tivi ty tfl Environ " Any
fr *''* ""ll h e restricted if c on taminat ! on found
LEfa, I) L ComiivoiiuisaUh Edison Co BO/O7/OV 2pp.
D0735Oc!"M> Foruja.rds response to IE Dulletin BO- 1 1 , "Masonry Hall
Design " Heqi>e- 1 ted investigation not poTfoiraod at Dresden,
Unit 1 dur to PX tended outage Flequi rpments ui I 1 be met prinr
tu startup W / o end
I'tOfLEH.D L Cnmmnniuealth Edison to B&/07/O7 3cf
V Operator Eiami nat ions
6O070203I1? Responds to BQ0512 Itr requeBtlno utension until Fall 1"7BO
for completion of annual requal i fi cation eiam due to nddl
work load Eiam date ma\j be del aged until SO 0930
COLLINS, P F Operator Liconaing Branch BO/Q6/1B lp
DOCKET 30-395 PALISADES NUCLEAR PLANT
F Security, medical, emergency &< fire protection plant
Foiuaids response to IE DuUetin BO-OB, "E. animation of
(.nntnf nrnrnt Linur- Penetration UeldE " Dresden Unit 1 designs
till! ht revjaupj t, feasibility up perForJrung radingraphlc
oiaminn.lion'i ui l l be nssesaed beFore unit returned to svt
I'LdPLKS, D L Cummuniufal th Edi&on Co OO/O7/O9 7pp
SO07O10473 DiscusGBa proposed change to IQCFR50 adding requjT
Fire protection plan at facilities Forwards commente on
rul Si suji pi pmontinii consultant comments Qunstions
appropriateness of rule, slnco rule reopens resolved issues
HOFFMAN, D P Consumers Power Co BO/Oi/27 Bpp
D071dO63O rfeBpontls t0 IS Bulletin 90-17 re results of teats, requi
bij I tern 1 No siyniflcdnt amount of uatev in scram discharge
viils Vent ii tlr.sin ] ines also verified free of obstruc bions
by performing dynamic air tps t
' F Cammonuipalth Edison Co BO/O7/1O 2pp
3075H0074 ForwardE nd d 1 response to IE Bulletin BO-17. Items 3, 3. 4. 5, ta
l< Ab NBLU pmcodure has been written to cover actions
nocoao jry uJion coiitrol rods fail to Fully ineort during
iupaJth Edison Co
10/JIO197 Fle^ponSii to NRC BQObHQ
civil pviinltie* by forwarding pa
PCOPLES. II L CpnuncinuiB'alth Ediso
9pp
of proflOHed
Foruards Revision 3 to 7903SO aeturitg plan Plan withheld
(rof IOCFR2 7-70)
HOFFMAN, D P Consumers Pooler Co SO/O7/OQ lp
3007330341 Forwards addl info re sui tab i 1 i tg, training tc qualification
plans, in response to NftC SOO515 Et OtO6 rDquests Info
withheld (ref IOCFH3 790)
HQFFHrtN, D P Consumers fouler Co BO/O7/I7 lp
9007240403 Provides infu re accesa nf WRC t< NRC contractor personnel to
Facilities for conducting appraisal at health physics
program List of personnel requiring picture badges yhich
specify "no escort required" encl
KEPPLER.J 0 Region 3, Chicago. Office of the Director BO/07/1B
l£)/:)10:3l:l FoTiojarrts rcBpanne to violation notoc! in IE insp on 8C-013I
CoTroulive actions prucedure nuu requires und er-tra i 1 er
cliecV of raduifl-sbe- sh>pment& !. pre survey of articles at
shipment o-ngin to assure pacla^P!, are uilthin dose limits
F CammimujHalth Edison Co BO/07/1& 3pp
9007380570 Responds to 791 1?9 request for info re evacuation time
estimates m site emergencij plan Evacuation clear time for
0- to 10-mile area around Palisades estimated at appro* 2
hrs. in summer t< uinter
HOFFMAN. D P Consumers Pouer Co SO/O7/23 lp
JOVIIOIMHS Reoponde to IE Bulletin 79-14, "Seismic Analysis for Aa-
Qu I b t JJofefcij — Re 1 stud Pipiny Sijs," by foruarding "Procedure
fm RVVIPUI t* Hft-olution of As-Iiuilt Oevialions" fc "Procedure
for Application of Illume Lurvei Criteria "
JANiZCEK.il F CommDnuealth Edison Cn BO/O7XK. ]p
Ei00730O1'?[J "Eiitjinecring Cr i tor i a/Prnr edurc For Revicu f. Resolution of
As -Bui It Deviation 5." Revision D
liNVHtR, T K EDS Nurlear, Inc EO/OT/O7 llpp
"Ernj i nt-cnng (ntoria ProieJure Por Application of Dlume
Curves Cr ifcc-r L a "
JiMVEJEFI. T K EOHMutlaar. Inc 00/03/07 20|>p
roruiards IE Insp »ept SU-^b-l/HO- 1 i on BO0709-I1 ?. notice
OP vinlntl on
H1ND.J A np&iati Z)i Chttdgo. bo fegtiards DranEh SO/O7/2I 2pn
-SOO/3'*OnVI Natitu of violation Priim insp on SOQ709-1 1
• Hug sort 3j (hli-agd, Office of the Directni 80/0 //SI lp
(E Insp Rupt 50-^54/BQ-16 on 2011709-11 No-nc amp 1 1 anc e noted
failure to updati' fuel ^sscmlilij loiations on fiieJ location ti
Dipnniiru rPCiTtls Lose of MEG!UII a\ie to i nati Ff i c i ent SNM
prortidiurps Details withheld (ref 1OLFR2 790)
F1MIFV.A G , PATTEHSDN. J P ft&gion 'J, Chicago, ClfficE of the
Dirpclor H1MD, -J A Region 3, Cfucsgo, Saf eou.ird* Uranch
IP
Diie-r.H 1 1'9 report's i' lelnted t art es.pundenci>
rorwriids munthlu nperating repts For June 19BO
-WI/INAH.IB. N t-iimmonuJeal (h Edison Co B0/O7y01 ip
)7t5O62!> Mo-nthliJ ojioratmg repts fnr June 19BO
. T CDmmonuiealtfi Fdisim CD SO/07/Ot 4pp
cori eupondence
9007300439 Foryards revised safeguards contingency plans Plans
withheld (ref lOCFFiS 770-)
HOFFMAN, D P Consumers Poucr Co BO/O7/21 lp
Q Adjud I tatorg correspond enC4
orlntiffi DEI iirrencci, f-EJIs
e007O9031fo Forwards Document C, "Equipment Outage Request, Maint Order
7Q-VAS-O64j " ac follouup to util S00623 response to NflC
interrogatories >i document requests Related correspondence
KUflPHV.P M Isham. Lincoln & Baale BO/06/35 Bpp
8007310243 Foruarifs Commi ssion 8O0327 memorandum & order containing
decisions on UCS 780502 petition for reconsideration of
780413 memorandum ti order UCB 771104 petition sought action
re fire protection for electrical cables
EISENHUI, D 0 Division of Licensing SO/Oi/29 B9pp
B0070701SA Hept on discovery status re civil penalty proceeding NRC
mill respond tn util supplemental mot-ion to compel discovery
on B007O3 Need for further discovery requests under
consideratl gn
DURNS.S 0 Rujemaliing t. Enforcement Division 30/07/01 lp
BQQ73lQ4Ab Forwards uttl 800703 Itr tc Revision I to "Environ,
Assessment - Palisades Plant - Steam Generator Replacement "
OIDDS.M E Isham, Lincoln !. Beale BO/07/14 lp
8007230310 Response in apposition to NRC B 0070 3 motion far protective
order re- CPC BOOH31 interrogatoriEE tt requests for
production of documents Relief not warranted per ALAB-99fl
H/Cert i Picote of Bvc
MILLER. M I , MURPHV.P M , BIELAHSKI-A P Consumers Power Co
GO/07/1B 19pp
B00725067B Memorandum & order ruling on licensee SOD314 & 0613 motiona
to compel NIIC ansiueri to BOQ221 requests Deliberative data
leading to hearing privileged & exempt from production per
traditional privilege tests Discussec !< rules on other data
SMITH, I U Atomic Safety and Licensing Board Panel BO/07/aa
39pp
'101O3 Formal fi^ LER RO-dlA/fJai -O
IVIAHAKl'5' N f.ommninueal th Edison To BO/07/lh lp
DOCKETED ITEMS
53
8007310319 Motion For proposed corrections to admini stiati VE law judge-
00O722 memorandum !< order re licensee motion to compel
discovery Interrogatory 13 uias answered 6y NRC on B00331 &
should be omitted from order Certificate of Svc end
BURNS, S G Rulemaling li Enforcement Division BO/07/2? app
K. Utility Final Safety Analysis Report IFSAH) !. amends
B007110399 Forwards Revision B to FSAR
FBGQ, H Consumers Power Co BO/O7/07 2pp
— BQO711O301 Revision Q to FSAR, i onsisting of replacement Page 9-2 re
critical MJE supplied by svc water si|S
* Consumers Pouei Co BO/07/07 Ip
P Operating license stage document!, t, CDvre-ipnndenc
BO0701O2B9 Forwards evaluation of opened bypass lines in cohtair
based on licensee accident assumptions Licensees DQA
represents realistic accident consequeni.es
BLAND, J B Environmental Engineering Branch 79/11/O7 6pp
S007100294 Forwards Amend 57 to Licon
notice of issuance & availability
CRUTCHFIELD. D Operating Reactors Branch 5 BQ/O6/06
DPR-30, safety evaluation
3pp
-8007100399 Amend 57 to License DPR-20, chann ing Tech Specs tn include
addl radial peaking factor limit
CRUTCHFIELD. D Operating Reactors Branch •) BO/06/06 13pp
-000710030V Safety evaluation supporting Amend 57 to License DPFI-2O
* Office of Nuclear Reactor Regulation, Director 60/06/06 3pp
000735066*. Requisite addl itifr- re ai)i>qi>dcij of station dPttric
distribution sys voltages Requests i espouse uithin 15 days
of 1 tr receipt
CRUTCHFIFLD.D M Operating Re.irtors Branch ^ 80/0(,/19
B007SB01H Forwards NRC "Draft Interim 1 01 hr,ir,il Fvaluation R*fl
Equipment Environ dual 1 f icolion " Rtpt will hr u">ed as input
for safety assessment for Top it MI-IS FHqurst- comriEnts
by BO 06130 W/o end
WAMBACH.T V Operating Reactor* Branch \> fiU/O(./19 Jpp
BQ07010733 Summary uf 600606 meeting u/ulil •< Cnon Nuclear
Bethesda.MD re oulstand ing itsuts From util i L-qucst 1 11
change facility Tetli •Speti. lu ihtre.Tie totiil radvdl pi-aV i
factor for Cycle rt TeloaO w/ll- il«',i gn fupl
LQIB, L Core PIT f urir.ioce Branch fJ()/H6/EO Jpp
B007O20557 Foruards "RCS AsymmctliL L«.nl- tvdlliat inn Program." filial
rept in respunse to NFIC 7B01^& Itr tci CUR 1 u singes IP
asymmetric LOCA load's C-E affidavit for uilhhuldina enc 1
Proprietary version op App A withheld Iref IOCFFIH 79O1
LUNDVALL.A £ C-E Operating Plants lluners Group BO/Ofc/30 2pp
--9007O20D71 "RGB AsymmBtiic Lnjds Evaluation Propi am, " final rept.
Vol I
* L~F. Poiuer Systems BO/06/30 .^Opp
--BOQ70a05Bl "RCS AEymmelnr Loads Evaluation Program, " final rept,
Vol 3
« C-E Pouiar Systems BO/06/1Q 300pp
— B007020S6B "RC1! Afiijmoietric Loads Evnluiitlon Program." Final rcpt.V/nl
3
» C-E Pokier System's 80/0»/30 JOOpp
-B007100310 Notico of issuance (- aval 1 ah 1 1 1 ty of Amend 57 to License
DPR -30
LAINAS.O C Assistant Director for Safety Assessment flO/06/Ofa
Spp
-8007030593 "RCI Asymmptric I oalte Evaluation Program, " final rept. App A,
numerical results, ovaluati 01, of C-E fuel Nonpi opr i etary
version App V, Pal i aades fue\ annlyi.i ii enc 1
" C-E Power 3yotefns 80/06/30 26pp
B007110217 Foruiards Amend 98 to License DPR-HOi safpty evaluation '<
nutlCB of issuance b ovallabilty
CRUTCHFIELD, 0 M Operating Reactors Branch 5 BO/06/06 Spp
— B007110a3fl Amend SB to License DPH-20, modify ing total radial peaking
for Type H fuel during Cycle A
CRUTCHFIELD. D M Operating Rear tors Branch 5 BO/06/06 Spp
— BOO711O2M Notice of issuance !' availability <i( Amend SB to License
DPR -20
LAINAS.O C Assistant Dnector for 'Safety Assessment BO/06/Oi.
2pp
G006260I45 Safety evaluation supporting Amend SB to License DPR-3D
Changes involve H-design reload in Cycle 4 onlij
» DPfiCB of NuclwBP Roactor negulatian. Director BO/O6/06 Spp
—9007030599 "DCS Asymmetric Loads bvnluation Program," App C.pipe uhtp
restraints & App D.plan foi fracture analysis of util cold
lag piping Final rept
» C-E Punier Systems 90/06/3(1 Hipp
--B007030600 "RE'S Asymmetric Londa Cvalufltion Program," ftpp ET, ECCS
analysis appriiach ui/rcducnd ciri>>t coolant clunnels in
peripheral asiiumblies Pindl ropt
» C-E Poiuer 9ystoma
S007O30a'iO rornards "Rept nn Cndurnnce Tciiting of Autllianj
Pumps "
HDFFHAH, D P Consumers Power Co EiO/07/01 1(1
— B007O30Ubl "Rppt on Endurance Te^tinci of Auitlianj FneriuatBr
» Consumers Pouor To aO/(i'/Dl l/i|>p
B007010111 Foruards final rule published in 500509 TR amending
10CFRSO 71 to require periodic updating of FSARs CompliancB
la not required until completion of E>EP
CflUTCHFlELD, D Operating Reactorn Branch 3 00/O6/10 6pp
80O7110136 Notification of BQO&10 meoting u/utll in Dethes.da.MD to
discuss shift technical advisor
MAMDACK.T V Operating Reactors D ranch S BO/Oi/10 3pp
0007230099 RequeatK submittal of proposed Tech Spec changes providing
For redundancy in deciiy heat removal capability in all modes
of operation Model Tech Specs uihicli would provide Acceptable
resolution end for guidance
EISENHUT.D 6 Division of Licensing BO /oh/ 1 1 6Spp
B007100399 Responds to 30052V Itr uihlch eipressed opposition to ACR9
recommendation to restructure BEP Rojp of licensees in
program uill expand Ltr foruarded to Commi EBionera
DENTON.H R Offno of Nuclear Reactor Regulation, Director
BO/Oi/lB 4pp
— H007100130 Eiprestes opposition to ACH9 recommendation to reatruc ture
SEP For BEP Dinners to perform safety analysis as outlined.
cost in dollars & manpower would increase dramatically
BCHAFI-BTALL, R SEP Owners Croup BO/OS/E1? Spp
B0071B02B7 Requests rommBnts on causps for !i possible remediBs for
events re site identified in end rept. "Loss uf Offsitc
Power Survey Status Rept," uiithin ISO days of receipt of
Itr
CRUTCHFIELD, D M Operating Reactors Branch S 80/06/19 Spp
B0070B0330 Notifies that fuel evaluation *. tavitij wall anali
requested by NRC 7911SO Itr. still in pfugre&i Proni B&-J of
fuel evaluation provided in 30O7OI A|ip 0, Final i opt liupt
will be completed by BOO 039
HOFFMAN, D P Consumers Power Co HO'07/01 Ip
8007350693 ForUBrils rei|uest For add! infn re SfP design lia^is events
Requests response within flS days of Hr rect'ipt
CRUTCHPIELD, D Opoi-ating Rearti>rs Branch S BO/07/01 Ipp
Q00709000B Forwards Revision 1 to "Cnvirnn Assessment, Steam OoneratDr
Replacement "
HUSTON. R W ronsumers PuuiPr Cu BO/07/02 3pp
— B0070I)0010 (leplacement Pagc't. b-S, fi-1 . 6-19, II- 1 >. El-3, submi tted as
Revision 1 le "Environ Assessment, 'ittam Gener<itui
Replacement "
» Consumers Poiupr Co atl/O'i/31 7pp
B007HS0001 Requests submltta) of application for amend to license
consisting of IVch Spec chnngp'. f' IICBTISB conditions PWR
Model Teih Spen, !e Model licence tondition1' for FMI-H
Lessons Learnnd Catojory A items pm I For guidantu
EISFNHUT.D G Division op Licensing HO/07/02 f.'Jpp
BOD7100199 Toriuaids appliratinn fnr ampnd to Litense DPR-20
consisting of change1; to tolh 'Ipecs
FRO"5T.S R Con'sumF.rK Power 'o (30/07/0*3 Spp
"E3OO71OOJOI
changes
DEWITr.fi
BOO71O0304 riiangtb
envi rnn monLlrri
a Consumer*. POU
!>PFt-,2Q cor
i h Epi i * 1
firrtm
UO/O7/O3
sting
I. 4 11 for
H037I ICS'JEt Respond* to NFtC QOOA 1 '? request fuir tomnmnl
Interim TEthmral F-jn luat iciit It.'pt on Equipment Crwl
Qualification For Pril i smiles Et.itmit Fquipnent trip
aF req.ii LI pri ft»ni-ti[>Ti R*p«luti&n ti f i <s5uo can p.roceed
HOFFMAN, D I1 Consumers POUPT ro H'Vf)7/07 2pp
B00/2a016l Fojuanis "Los* nf Uffi,it
replant" rept hit-Liar Jed U: o Table -
, D N Op em 1 1 ng FtedctQ
/ey Status Flept.
B0/O7'0i3 3op
uOO716O*3O3 Responds to NRf P002 1 1 request for add
VI-1. containment i-olnteii i,ys Hpenfic info t. liel
drawings e nt 1 W/ci drauirigs.
KOFFMAM, D P Consumers POUIOI ( o Bd/07/14 llpp
nfo re SEP Topn
a00717Q<17'1 Foruai d-5 IE Circular 00-14. "R.iil i oacti»e Contamination of
Pl,jnt Demlnerali led Hater Sys »< Resultant Intmnal
Contaminat-iun nf Pi'rsnnnel ' No written i esponse required
KEPPLFBiJ G Region 1. ChicaBO' Office of the Director BO/O6/31
IP
Q007230.U2 Ffiruraids IE Bulletin f30-li., "Potential Ml sapp 1 1 cation of
Rosemuunl Int Modi* la 1151 !, 1152 Pro5fiiiro Transmitters
W/Either rt or D Output 00(10= " Written rosponso icquirod
IE Circular 30-1& also ent 1 No untten i espoiiao required
KEPF'LefJ.J Q Region 3p Chicagu, DFPlce of the Director SO/O6/27
IP
BOQ7.110177 Rf!K|]oiidE to IE Bulletin GO-12 re decaij heat remoual sijs
Consultant i HVIPLJ unacc eptrib 1 e ROWIBUI (. ruEponBe mill be
5iibmi tted by 000730
P ronsumers Poiuer Co flO/07/01 lp
B00714O350 Kespflnde to IE Bulletin GO-ID. "Contamination of
fJonradioac tive Sy s & Resulting Potontlnl for Unmoni tored.
Uncontrolled Release of Radi oat t I vi tu In Environ "
Domlneral I led uidtcr <IIJG isolated from storage lank at al
HOITMAH. U P Consumers Pouier Co 00/07/00 3|)p
8CQ73BaO7t> Responds to FlOO^in ]tr tri > Ahearne ob joe t inff: on behalf of
ouiiur^ oF plants under StP1 review. tn cuirpnt plans Fnr
BipBditi?d rrviL-u Qf fiivlron q 11,1 1 1 f i c a 1 1 on of electrical
equipment FD ruf.ir J E applicable mcmnr .iivdurn .'• order
DENTON, H R Office riF Muclcar Re,ictor fl*g ulati on, Director
80/07/li, 4pp
8007230")7J Sufinufcs ucnfieatinn teat Tssults in reippnEB to TJRC
1 tr re ad eqtmc y of nnsit-e il L a tr i hut I on of |i oupr from ofPfalte
circuits OesDlts of annlyliciil muiJt 1 atmulatin-g uorst rase
conditiDTiE corrplatert ue 1 1 iii/firpviou!> results
FR03T.B ft Consumpr* Power To f30/'0'/lt! flpp
B007140310 RoBiionds to IE Bulletin BO-OQ, "Ciaminntion of ContainmBtit
Liner Ponetratinn Wolda " Penetrations m/fluud head design *i
ifastgn-3 u/Eontainmrnt boundary butt ueldSi betueon
ponotrat Ion nlueve (< prneoss pipinfl total 93
HOFFMAN, D P Consumers PQUET To (30/07/09 4pp
BQQ713QHQ3 Forward a "Suty-Djy Kesponoe to NUC IE Oul lotln BO-1 1 "
P Consumers Power Co 80/07/09 lp
— a007130B06 "9i«ti)-Danv Respunae to NRC IE Bulletin SO-11 "
• [lechtpl Corp RO/06/30 9Spp
Q Inspe<- ti or
TET Hu]]otin<t (i cor
spunrieiite
B007O1O17B Forwards lb Inop ttRpt bO-3B5/HO-Ot on li(10401-OD03 No
noncompllancv n{ited
HE19HMAtJjR F flpgion 3. Ctiir.iflo, Rnactor Qper.itioiiB NifClear Support
Dranrh 50/05/3? £f>R
— 00070103"-? IE Insp Rept SfJ-^'SS/eO-O!!, on CiOO-lOl-O-iOS No nQucompUancc
notoil Ha jar ,,roafl inspcctod iittwitip;, dipnng long-term
shutilouti, i loanl tne 5b, propjrat i nil-, for startup i- acllon nn
previous in-sp Fifidinga
BUVD.E C , D/iKCR.K It - JtmerNBCW, D I- Rroiun 3, rhUa^o, Office of
the Director no/O5/3] Bpp
tl0070a0051 Forwards IE Infn Ni>llto S<J~3S, "Ilre.Jkdnun<i In Contflml net i on
Contrnl rrugraniB " flo unt»un lecpnnse required
KEPPLER, J Q fipjinn 'i, Chicagci, Uffici- at the Director BO/09/2B
IP
B00721O3SS Foruiarrls IE rirrul.tr MO-13, "Grid 5ti-sp Damage In
Heat i ngh ousi« Fuel Asti'inb 1 1 1" " No untlen respons-c required
KEPPLER. J 3 nnglnn 3, fhnaa"' Office of the nii-ector CO/05/SB
BOO/9305 1J In Forme nf compliance u/ordcr modifying license Insp
completed June 19BO Results of insp Ehouod that plant uias in
compliance ui/limiting condition of operation requ Irnments of
Tern Specs
HOFFHAM, D I' Consumers Pouer (o QO/07/16 lp
B0072300AO NotlPloa NRC of compliance in/791 109 order requiring liccnsfto
to insp accon^lble valves ft other controls for engineered
aafetij sus on mnnthlij b^siii In^p completed in Juno 1930
Plant is in compliance LJ/limitinj condition* for operation
HDFFfWN, D F> Cuivsumera Pouicr Co aO/07/ lb lp
9007230395 Foruarils roqulTed af Firm.iL ton 1 nail vert on 1 1 ij omitted From
300761 response to II: Bulletiri 00-11. "Mnsonrij Wall Design "
, D F' Coit^umarn Power Co BO/O7/ IB 3pp
HcopnnJs to Items oP noncompl innc e noted In IE Insp Hept
80-S55/BO OB Corrective actions administrative control
procedures have been implemented to asnur-o mill Instrument
nperobilitij raqui remont-a arc miilntflinud
Consumers Coiuer (.0 80/07/23 app
It Periodic upornting repurtE It related currospondenca
0007010115 Foruards IE Info Nut ice 130-30- Loss of Suction to Emeraento
Ft? e duster Pump s " No w-r it ten response Tflquiretl
KEPPLER. J 3 Region f, 1'hic.agu,. Uffico of tJic t)ir«L tor BO/O5/E"?
IP
27 Faviitards "Piil i -lodoe Nuclear Pouier Plnnt Radioactive Effluent
e Scmiannufl 1 H epti Jan-June 197B "
P Consumers PouJsr Co 79/00/29 lp
Foriuards IE Info Notice 80-2(b. 'T'.a 1 uation i)P Contractor
Ort Progrjima ' No written rrtponsii rpquire-d
Region 3, (hitago. nfficu oP the Director DO/OA/10
— BO 072 10 440 "PallS'ides Nuclear Power Plant Radioactive Effluent Rolsme
fiemiannnal Hop ti Jan-Juno 1970 "
« Consumorft Power Co 79/OB/a1? 7pp
B0071A017;i Forwards IE Info Notice RO -?7, "nogradatlon oP Flcattor
Coolant Pump ^luiK " Mo specific action or rufponcn
rBquirBd
KEPPLCR..J 0 Rfginn T. Ctiiraod, tlffiCE of the Directoi BO/Oi/ll
lp
Q0071I0109 Foruiards montMij o|iorntlnfl rapt fur June 19BO
MEINCKE.J A Cnnsumora Pouier Co 00/07/03 lp
— fl00711Ofll4 Monthly operating ropt for June 19BO
DODTKE.P J Consumers Power Co BO/07/OS fl
8007030031 Fnrmarils re Dulletm HO-lt. "Possible Loss of E
NotlficaUon Sys (L'NSJ U/Loa' nf DFfi.ltp Puuei " Written
rB'aponas ro nuiced
KEPPLFR,J ff Rnginn a. Chicago, fKfico of tlic director
60/06/lfl
8007020352 ForuanK IE Clrculiir [fO-15. "I u«s nF Reactor Coolant Pump
Cooling ti Natural Circulation CDtildDwn : (In Wfilteu response
risginn J.
nffico of Lne Director BO/Ofi/20
Submits status rept Par Junn-Jul 19BO Dochtel Is preparing
final ijeslgn far lon>g-tarm cooling mods scheduled For 19B1
refueling auta-gc
HQFFMflN. D P ConBuraerE Power CD 60/07/19 lp
B Reportflblo ot L urrenieSh Ll=Rs !< related correspondence
H0070B01B9 roruiardfl 1 EH BO-OIWO1T-Q
HOFFMAM. D P Cnnniiffliiri Pouei Co BO/07/01 lp
DOCKETED ITEMS
— 80070B0199 LER BQ-Q19/01T-O on 8O060?, during Tech Spec review.Toch Spec
3 3 determined to provide too little berated water For
safety injection Caused by imprecise wording of Tech Spec
Lota level alarm sotpoint changed. Tech 5pet under evaluation
« Consumers Power Co SQ/O7/O1 lp
B00707O26B Responds to 000123 Hr re use of tlDVN code in determining
imposed on top at f)l>VN cnl cul.it ions
MILLS, L M Tennessee vallc-ij ftuthnritij flQ/05/JB 2pp
0007090314 Forwards updated LFR BO-Q17/Q3X-1
HUSTON, R W Consumer;, Power CD BO/07/03 lp
— BOO7O9O319 Updated LCR HO-O17/03X-1 on BOOblO.PS testing procedure*
review revealed setpoint nf PS-I8O1 throuoh 1B04 to be lower
than permitted by Tech Spots Caused by faulty procedure
Procedures revised to conform w/Tech Spots
» Consumers Power Co BO/07/03 lp
B00722047B Forwards NPDEB noncorojil iance notification TE
dnilii ma i limit For oil t< grease on 800630
HOFFMAN, D P Consumers Power Co BO/O7/16 lp
iceedinq at
— BO07230484 NPDES noncompl iance notification on B00630, daily mai limit
for oil t< grease of less than 20 mg/1 uas eiceeded Weekly
grab sample indicated 36 2 mg/1 oil Caused by Failure of
F20/M13 filter elements Filters replaced
FGDE9, R L Consumers Power Co BO/07/14 lp
8007290414 Forwards NPDEB noncomp 1 iance notification
HOFFMAN, D P Consumers Power Co BO/O7/33 lp
B00703O71! Responds to 800-122 l>-i i p lr-iii levi>] uasto mgt at plant
Ultimate util abjective is to proviilr lor tin&ite rariuahte
storage Ho target date hds been established bij TVft fcr
submitting application For incineration approval
NOVAK, T M Assistant Direttoi For Operating Reactors BD/06/S5
3pp
S0070B0286 Responds to NI1C SOO^H ! request FUI Facility participation in
phase two Interim Reliability Evaluation Pi ograrti Urges
definitive conclusion of phdsp one before cQiitinuing Outline
oF critical ai Bfl5 to be rebolved end
MILLS.). M Tennessee Valley Authority E10/06/3Q 3pp
B00717O3I? Summary oF B0061
reliability evaluation pvugriiin
OLSHAN-L N Operating Reactoi5 Branch l
ting u/utils in Eetheadd.MD re interi
/O6/10 3pp
00070B03GO Responds to NRC 7^1OOJ 1 tr to all BUR licensees t, 791031 1 t
to util Utll funds allocated fur Mark 1 owners group
Full-scale test Facility program Schedule For t;imp Iption oF
plant-unique analysis forthcoming
MILLS. L M TennoBbee Valley Authority 00/07/01 lp
— BOO7290616 NPDEB noncompliance notification on 8007Q3-O7, oil !<
grea» accumulation exceeded daily mai t. monthly avoraoe
Itmitations Caused by bur&t uclded scam at, generator seal
oil strainer Seam reuelded
FDBES, R L Consumers Power Co BO/07/16 3pp
DOCKET 30-259 DROWNS FERRY NUCLEAR POWER STATION, UNIT 1
F Soeurityi mediiali emergency fc Fire protection plans
8007310034 Forwards list of vital areas ft equipment resulting From
vital area analysis conducted at facility & computer
printout containing supporting data for vital area analijiis
Ends withheld Iref 10CFR2 790)
IPPOLITO, T A Oporatinfl Reactors Branch S 00/06/30 2pp
B0073200SB Confirms that LASL will conduct vital area analysis of Units
2 & 3 on 800714 E Claibourne fc J Hand will conduct visit
IPPOHTO, T A Operatino Reactors Branch S BO/07/03 Spp
B00730O061 Requests confirmation OP agreement to participate In program
to aiamine north uall of reactor bldg it review records re
tests on fire protection sya per Commisaion Order CL1-80-2J
Al»o requests that listed Info be available For NRC visit
EIHENHUT.D 0 Division of Licensing BO/07/16 3pp
B007210O26 Forwards request for addl info to complete re
containment purging ti venting at faciliti-es
NDVAK. T M Assistiint Dirertor For Operating Reactors
8007220376 rorujards proposed changes to ETS Section 2 1 re thermal
d i schsrge limits
MILLS. L M Tennessee Vallpij Authority 60/07 /M lp
— B007220377 Proposed change to ET3, Set tion S 1 re thermal discharge
limits
» Tennessee Valley Authority UO/O7/1-J lp
BQ07240233 Foruidrds Amends M, 36 J. 33 tu Licenses DPR-3a, DPR-53 I,
DPB-6B,rB3jioc t ively *< notice of inauance i, aval Inbl ] itij
IPPOL1TO.T A Bpernting Reactor-, Branih 3 90/O7/15 3pp
— B007S40231 Amends 61,56 d 33 to Licenses DPR-J3. DPH-53 !< DPR-6B,
respi'C tively, chang ing Tech Spots re thermal discharge
limits
IPPDLim T A Operating HeactorB Branch 3 BO/O7/f> 13pp
~B007210234 Notice of issuance '• availability of Amends 61.56 !, 33 to
Licenses DPR-33, DPR-5a tf DPH-6EJ, respec tively
IPPOLITO.T A Operating fieactors Branch 2 BO/07/1S Ppp
0 Ad judicatory correspondence
8007310243 Forwards Commission BO0937 memorandum (< order containing
declBioni on UCB 7B0503 petition for reconsideration of
7B0413 memorandum (. order UCB 7711O4 petition sought action
re fire protection for electrical tables
EISENHUT.D 0 Divitlon of Licensing BO/06/H5 B9pp
H Oontral correspondence
B00717O380 Ejoreasea concern re plans to construct lou level waste
•tDrage t incineration facility Proposed Facility mould
present significant health risks to hiahly populated area
Requests public hearing & CIS
HOLLINOSWORTH Affiliation Unknown BO/07/O9 lp
8007220S61 Advises of error In responses for Site Specific direction I,
Parts D !< C, suhmitteil in 800616 Itriin rosponao to questions
re lou turbine disc cracking Conecb responses end
PARKER. W 0 Duke Power Cn UO/07/1/ 2pp
B0073003B1 Responds to pncl B00602 memu re lou levtl waste eig t at
facility Util plani to conslrui t tuu separate low level
uaste facilities nnaite Const on Firnt four cubicles began
recently NRC approval of plans npct^sary
DtNTON.H 0 Dffiiu nf Nuclear Reactor Rogulfltion. Director
BO/07 /aa 8pp
— B007300291 Requests summary of util plona to build loiu level uraBte
sto-rage facility Also requests uhether NRC approve) li
required d ulipthei public henrings have been requested
BRADFORD. P A Cnmmlssion HO/O6/02 Iji
J Insurance i indemnity information
Q Inspei tion reports. IE Bulletins !i corra$|iandcnce
8007010516 Forwards Endorsement St to ANI Policy Nf-198
FlELDERiJ Marsh t< HcLennan.Inc . M !• M Nurlcar Cctnaul tants. Inc
Div SO/06/S3 Bpp
B007310436 Forwards Endorsement 43 to MAELU Policy MF-66
FIELDER. J Marsh *. McLennan, Inc . M !< M Nuclear Consul tants, Inc
Dlv BO/07/21 Hpp
P, Operating license stage documents !< correspondence
B00724O089 Forwards li: Info Notice BO-J'O. "Loss Of Dncay Heat Removal
Capability at Davit-Dnsse Unit 1 Uhilc in Refueling Mnde "
No response required
O'REILLY.J P Region 2, Atlanta, (jfrirc of the Oifoctor BO/05/OB
3pp
G007140176 Forwards IE Bulletin QO-i.i. "Clnrking in Core Sproy
Spargers " Written reapunse requiri-d
O'REILLY. J P Region 2. Atlanta. OfFi.e of the Director BO/09/1H
BOQ7230O2B fiummai-ij of BOOP07 meetinn w/MarJi I owners group in Qethosda.
MD. rt revisions to NRC acceptance criteria J< outstcmiling
issues relative to Mark I containment long-term program
8RIME8. C T Plant Bu,stems Branch BO/02/2! 31pp
8007020192 Fmunrdi IE Info IJotHe 1JO D*1, 1:nroakdouin5 '" fr,
Control Pi Ugranic " No iniilteTi responsp rcijui! ad
O'REILLY, J P Repion ?, Atlanta, Offiie of the Di
DOCKETED ITEMS
023!t Forwards IE Irifq NoticD BO-23, "Loss OF Suction to Emergency
ui.-iter Pumps " No ioritto.il response.- required
ILLV.J P Region 2. Atlanta, OFFlco of the Director BO/05/S?
V Forwards IE Info Notice 30-36, "Evaluation of Contractor
grciflitt " No u>r 1 t ten re^pons-a required
LV.J P flegiom 3, Atlanta, Office of the Director HO/06/10
O306 Foruiarda IE ftunotin fto-11. "Degradat i on of RIJR Be ram
hargt Veil Capability " Written response required
ILLV.J P Reuion 3, AHantd, Office of ttit Director BO/Oi/12
0499 Forwards response to IE Bulletin SO-09 transmitted by
•Reilli) 300-117 Itr Final rept For Martsvllle !. Phipps
plants will be s,fnt on or before S01O17
S, L M Tennesscii Valley Authority BO/0&/I6 2p p
02i)7 Forwards no tic BO of violation & proposed imposition of civil
1 tij re IE IDM> on 80042-0 >i OiiOt of transport vohiclu
for carrying r.iduante
LO.V J UFflco of Inspection !< Enforcement, QfFico of the
••tor BO/06/ in 3pp
030271 Notice nF violation from map on 600-120 t. OSttl
OPfien gp Inspection f, Enforcement, Office of the Director
ip
OE0375 Notice of proposed Input! t ion of civil penalty in amount of
.000 re insp on- 800420 t. O'iOl
Office nP Inspection d Enforcement, Office of the Director
/OA/1U In
17*1 Forwards IE Bulletin 130-15, "Possible Lnsi of Emergency
fUatlon SifS (EMQl W/Lom of OffsllB Pomcr 'J llrittan
in so required
11LY.J P Reoic-n Z, rtllanta. Office of the Director 00/06/18
^153 l)l<icu>>SB3 BOO -1 2!> (•< 20 r.idiiibion aurv«g uin I c h rovrjled
atlon Ifvels on WDhicle eurPace eiceediiH) rojulatary
ts horwflcitB. noticE of violatirm b nntico 11 f propnied
sitlan Df cbvll peraltij
-Op V Hfflre of Inspection t Friforc-eniDnti npfitc of tJic
ttor QOJQti/ltt Sff
1.10155 Notice uf violation Frurn insfi on 1700430 ft 030] Nnricomp Hanc o
od radlflttun levels on pil-clageE of JiienHfld motl
e*ilfftl regu 1 .itory limit
Officn fif Insppttlon J. Enforcement, OffUe uf the Dliectnr
ip
1O1M Notica uf |iropospd Imposition of civil pciialtin in amount
tG.QOO for Itums op noncanp 1 ianco r« raif in 1 1 nil lovvli on
rface or pjcknges eitetdtng rugula-tonj limiti
Offictf of Inspection !< Cnf orcemon ti QfFlie of tfiu Directur
'OA/1I! Iji
B007170O70 Forwards IE Circular BO-14, "Radioactive Cpntaminatt on of
Plant Deminural i led Water SIJB t, Rosult^nt Internal
C on tami licit ion at Personnel " No lurittpn response- required
O'REILLY, JP Region 2, Atlanta. QFfite of t!n> Director BO/06/H4
IP
BOO71SO523 Forwards i-Eaponse to IE Bulletin 79-27i "Loss of Non-Class
IE Instrumentation & Control Pouinr Sijs DUB During
Operation." !. to 600104 con Firraator^ order-s Fncduiator pump
turbine Si main turbine trip circuitry nil 11 be upgradid
MILLS, L M TDiinesfiep Valleu rtuthoTity BQ/Ot/Bfi Bpp
B007B3O2S3 Forwards IE Bulletin HO-16, "Potential Mi sapp 1 ication of
Rosemnunt Inc Models 1131 *. U53 Pressure Transmitters
W/Eitlisr A or D Output CodEi " Written i-esponsE roquired
IE Circular 80-lft algo cncl No writton TesponsB required
D'FIEILLY.JP Region S, rttlanta. Orfica of the Director SO/Ofi/a?
»P
BGO721GQ7I Forwards TB-spoaise -to IE Bulletin 80-10 Potable water.
ntlnera-1 i led water ti aujiliai-i^ boiler sys havt possible
Interfaces betueen nonro Jloac lave !i radioactive ays Routine
sampling b andlgsle program established
MILLS. LM Tennessee Valley Authority SO/O7/07 3pp
BDQ733O73(> ForwnrJs monthly status rep t re IE Bulletin 79-14, "Seismic
Analysis for- fts-Huilt Baf »tij-Fleloted Piping SIJB," presenting
status of work as of BOO701
HILLS.I. M TeniiEsaee valley Authority BO/07/OT 29pp
Hcspc.nrtB to IE Bulletin QO-OB, "Ejamina t ion oP Containment
Penotr-atlon Welds " fisaulta -g F investigation enc 1
HILLS, L M Tennessee Valley Authority 80/07/07 5pp
B007310I03 Foruarrii rooponEB to IE bulletin 00-11 Identifies masonry
walla that support or arn npar aaf »ty-relaitBd sijs Submits
schddulB for ro-evaluat ion program
CO OSS, J L Tennessee valley Authority; BO/O7/OB 3pp
H 0.0720 04 60 Acfc roceipt oF BOO61A Itr informing NRC of steps taken to
correct violations notod in IE Insp Flepta 50-239/80-20,
SO-a£,0/OO-lS t. 50-H96/BO-lii
LEWIS, R C lleglon 3, Atlanta' Rcartor Operations Nuclear Support
Branch 130/07/09 Bpp
— 00072H04AH Flespondft to NRC BOO520 Itr ro violations noteil in Insp
fiepts 50-2D'J/BO-aO, SO-HAO/SO-t 9 t. SO-29t./BO-lft Corrective
actions Ca^llbr valvu orientation corrected -Justifies
decioinn re nanrepor ting of dwi-ael gcnrator failure
MILLS.L H TeiiiiPssee- Vollcij Authority BO/O6/16 flpp
--H007atl0173 roruiardi- IE Insp DeplB aO-357/BO-SO, 5O-B60/BO-13 &
SO-296/BO-16 an HOOflO!J-O9Oa fc notice of violation
LCKiS.n c Ffsgion 3. Atlaritii, Reactor Oparations Nuclear Support
Branch BO/O9/2O 2pp
"-0007200-170 Nutlcff of violation Prom in&p on BOO-5O5-OS02
* Htgifln 2, Atlanta, Office of the Director 60/03/20 Ip
1391 Torunrdi IF Circular BO-13. "Uo»« o-f Htuttof Conlant Pump
ng d Hnturol rirtulatlon Conldoun " Nu uirHtcn riJiipoiiSB
[red
LLV, J P Wsgicn 2. Mlnnta, nUira vt lh» DirDctnr RO/06/SO
IE Insp rtupts SO-2S9/SO-3O, 5O-2*0/BO-15 t< 50-276/80-16
nOOIO!)-O302 Noncompllonce nottd Palluro to aithore to
survoi 1 Innco instructions d ta make prompt rept to HHC
SULLrVAN.n I- , CHAiCpJ » neglon 2, Atlanta. Office Df the
Director DrtMCF.H C Rejioil S. Atlanta, Reactor Operations
Nutl«nr (Support li ranch ao/O5/20 7pp
M
ronuurdi Wnste Pactaging Inip Hcpt 1 5001)0, i WHO- 21 on
LLY.J P region 3. Atlanta, OPficir of the Divrctor
Wfl9tu P.ick.ijlng Inop Brpt 1 •lOWOOn'? / 00-^! 1 (in EJ0012Q it 0501
icompliiincp nofnd radiation levels on surface c f Lloieri,
:lullv8 use vehlclo In -eicPBB of r-eaulntorg- limit*
>UP.G L , PCfUV.H M Ht'flion S Atlanta, Tucl F,icili*g (.
»riHli Hafetij nranch 00/06/30 flpji
3flfl Forwards IE Insp Floptu 5)0'L'ri
6/00- SO S- 30-.ja7/HO-L>K
LLV.J P neijtnn E. Atlanta, Office of th* Director RO/Oib/33
IE Inop Rei'ta 50-aS9/HO-35., BO -^60/00- 1 '?, 90 296/BO-2O !r
-2i5 on HOOSB1 Innp consisted of enforc »ment mn«tlng
Aaufl-OA to Jtstut* nicoeiling DDT rndtut it>n limit*
ing -shipnpnl of rnilun-iti Iran Drowns Turry
ICE.H C RnsHtn 3, Atlanta. Reactor Opor.it i nun NucUar Support
nch aO/06/Pt* Spp
TariuBrds rosponBB to I tern 1 of IF Bulletin 80-17 re uioter in
scram iTLschnrge vol No »tflni'it»nt amount o-P water uas
found in lilsrh.irn* vol ft OBioctatBil piping Scram discharge
v«nt valven ore operable
CROE1B, J L Tennessee Vnllty Authority BO/O7/1I 2pp
(1007310067 Foimarils Becnnd interim rnpt in response to IE Bulletin
UQ-06 31tue 130061E.1 intBrim i-e|it,util completed revleut of
primarij contiiinnent sgs. reactor protection sys, HHR sys fc
core spray sys tvaluati-on of ather sy» underuay
CHOS9. J L Tontn?B&B» Vallou Authority SO/O7/11 2pp
Q0073I033& Foruands r*apcns» to NRG 800616 notice Qp violation t, notic*
of propoaed imposition of civil penalties r« IE SO042B S.
OSOi imp Correc t IVB aetian-s r ad unite ship pins procedure
rovlsoil Ctvil penalty Fee ToriUBrdod separa tellj
H, L M Tennessee Valley Authority HO/07/11 Ipp
QOO7BB0533 lonuests extension until BQDB11 tor pBrforming manual t<
autonatlt »cram renulrcii by IE Bulletin SO-17 Eitenslon
nendod bocauae op current tiuat wave
MILLB.L M Tenresflet VallBU Authority HO/O7/li 2pp
DOCKETED ITEMS
BOQ731Q20B Forwards response to Items 2 (Unit 3>,4,5,6<c> J, 7 at IE
Bulletin BQ-17 Present standby liquid control sys design is
unab 1 e to support two-pump flaxy but syi is equipped ui/
interlackino. contacts Item 2 for Units 1 fc H mill be aHnt
MILLB.L H Tennessee Valley Authority 60/07/14 lOpp
--B007Q90006 LER 80-048/031. -0 pn 000602, at steady state pauier, leak
(lethieen root valve & main fire hedilur on sensing 1 1110 PS-26-
41 during running of SI 4 ) 1 A Caused by crack iri halP inch
schedule 40 carbon steel nlnplt1 threads duo to corros-ion
» Tennessee- Valley Authority HO/07/01 2pp
B007BW337 Grants extension of time to SOOB11 for performing scram
tasks per IE Bulletin 60-17
EI8ENHUT. D fl Division of Licensing 80/O7/1B 2pp
BOQ7300S72 Foria»rds response to IE Bulletin 79-01Q, "Environ
Qualification of Class IE Equipment " Summaries of equipment
qualification evaluations. basfld on Encl 4 cr I teria, enc 1 Full
response will be forwarded when evaluation* complete
MILLB.L M TunnsssBB Volley Authority BO/07/1B 54pp
R Periodic operating reports !i related c orr aspondence
HOQ72a0443 Forwards "Effluent 4 Waste Disposal Semiannual Repti "
supplemental info for second half I97EJ
DEWEASE.J 8 TennOGSBB ValUy Authority 79/O2/1S Ip
— 8QO7230462 "Effluent & Waste Disposal Semiannual Ropt, " suppltmenta)
info for second half 197B
* Tennessee Valley Authority 79/03/19 ISpp
BQ07220342 Forwards "Effluent 8. Haste Disposal Semiannual Repti "
eupplemental info, first half 1979
ADERCRDMuIE.H Tsnnefl«»" Val 1 By Authority 79/OB/17 Ip
— BQO722034A. "Effluent tc Masta Disposal Semiannual Fiept, " supplemental
info, first half 1979
* TtnnessBB Valley Authority 79/OB/17 Itpp
BOO72204B1 Forwards "Effluent fc Hsate Disposal Semiannual Root,
Supplemental Info, eecond Half 1979 "
ABERCROMBIE. H Tennasiva Villey Authority BO/O1/31 tp
— B007Z2O491 "Effluent d Waite Disposal Semiannual Rept, Supplemental
Info,fiBcon4l Half 1979 "
« Ttnn.jjBn Valley Authority BO/01/31 l&pp
BOO7160S52 Forwards monthly operating rept« for Juno I9BO
AnERCBOrlBIE, H L Tunnessee Valley Authority BO/07/10 Ip
B007290B64 »D on 80070B, dun nq i online survoi 1 lane e instruction, PCY
73-43, u^lc:h cuntrols conlini] water to gland seal condens-or
b lube oil conlBr.udE Pound Stjtk in closed position Cause
unknown Equipment eipectad to 6w returrii'a to 9*c by BOO-700
ADERCROMDIE.H Tennessee valley Authority 8O/07/OB Ip
B007150570 For
CALHQUN.J R
updated LITF1 79-OP5/OIX-I
•n-ssae Valley Authority GO/O//1O 1 p
--B0071S057fl Updated LER 79-023/01X-I on 79092(,,niaJn ^.team lines not
isolated after high temp logic actuation Caused by
mis interpretation of Toch Spi>t5 Tech Eipec revision- proposed
* Tennessee Valley Authority BO/07/10 2pp
B007230-14!i FormardE SO 50-259/8054
MILLS, L M Tennessee Valley Authority
Ip
--00073301152 RD 50-259/B054 on B00706,nvpr temp eiceeded mai limita
for over 1-h at downstream mun i tor Caused lri| tpmputer error
Predictive computer program underset] mated ma i doiunstream
temp by 2 F Cooling towers used, stati on loail reduced
> Tennessee Valley Authority QO/07/15 3pp
B007530170 Forwards LEH SO-049/03L-0
CALHOUN.J R Tennessee Vallpy Authority
—0007330474 LEU BO-049/OnL-O on SOOA20, d uring surueillanca check, TI
pressure increase detected on shell side of 1-f RHR heat
sichanger Caused by lnos*no<l nuts r(ue to thermal cycUnfl !'
vibration (test eithiingpr reabsembled '< tested
* Tennessee Valley Authoiity BO/07/15 3pp
BQ072JD490 For
CALHOUN.J R
ardB LEU BO-051 /OJL-0
Tennessee Valley Authority
--B007230491 LER 80-O91/03L-O on l!0t)626, scram diichargc vol high luato
level -suitch LS-84-fl5A foilnd Cnused liij float lodged in
BL-303-r;3-X lovel smitches Tloat chamber flushed
* Tennessee Vallny Authui itij BO/07/1B 2pn
— 8007 160 5 Si Monthly operating ropts for June I9BO
THOMi T , OREEH.D TenneiaBr Valley Authority BO/07/03 33pp
B007230533 Forwards LER BO 010/03L-0
CflLHDUN.J R Tennessee Vallei) Authority
8 Reportahle accurrcnces, LEfis !< relatnd corresponflence
H0070fl0393 ForusrdB LER BO-045/03L-Q
CALHDUM, J fl Tenna*se> Valliy Authority BO/06/27 Ip
—8007330531 LCF! (30-OHO/03L-0 on 0I106J4, during performance cnec k , fniin
presBure suiitrh PS-47-14A nu'iuirDd Caused by personnel
failure to follow proper procedure! For working on rSSC
equipment CrusBurQ switch reuiircd correctly
» Tennessee Valley Authunty UO/07/1B 3pp
— H0070fl0397 LEU BO-045/03L-0 on B00i02. at BOX pouer-HCCI foiled to meet
Plow requlrenvnts bceaut* twrkini stop valve tripped Caused
fay worn mechinical ov»r*p.od trip piston New parts
inttalled tc teitert
» Trnn*c«ee Vellti/ Authority BO/O6/B7 2pp
B0070B0301 FDr
CALHOUN, J, R
»rils LEH BO-04*/03L-0
Tennea»e« Valley Authority
8007290657 Foruiards LCH BO-O54/C4T-0
CALHDUN.J R Tennnaspo Valley AiftnoritU BO/07/1B Ip
—000729066'! LCH BO-094/Q4T-0 on 13O0706, during nui-mal Qperation, ll-S (,
U-l uiere placed on cnolimj IIIIUBTS Temp continued to rise
River temp pUddert at 90 3 I !< tlicn derlinerl Caused by
inaccuratp nvei temp predictions due tu solar heating
* TonneflSfli! Valloy Authority UO/07/IB 2pp
— 8OO7000306 LER BO-04A/03L-0 on B00605, during power operation, uhi 1
pirforning surveillance test, cor* spray pump discharge
pr»*»ur» swittli.PB-V3~^4, BiceBded setpoint Caused by
instrument drift Switch was inopec tod, cfll ibr I> tested
* Tonnissci Valley Aufcharity QO/06/S7, Ppp
BO0734CM53 P»rt 31 rept re defective Terrij Turbine Co HPCI turhino
Cauted by machinino error in fabrication of mechanical
avirfpita1 trip valve bodv assembly which resulted in HPCI
remaining in tripparf condition Valve body rvplacid
0 T«nne*aH»,Vallfy Authority 0O/06/30 3pp
OOO7OB0313 Foryird-* L£R BO-04-7/03L-0
R, tnnn»B&o» Val log Authority
— B007OB0333 LER BO-047/031--0 on 00060^, durino pouer operalion. wh 1 1«
toting dryu«ll air lantplinj) »ys, vacuum pump aasociatDd u/
F4M-J-90-2S6 fHtltd C»u««lJ bi/ normal wear Pump uas replaceil
* Tti»n»»s»* VallBy Authority BO/07/01 2pp
8007290737 Formardt LEO aO-Oa?/OJl--ft
CALHQUN, J R Tennessee Valley Authority
— Q0072907fl4 I CR BO-OG2/03L-0 on BllOtSU, during normal opera t ion, 4kV SI
n tripped on ilogrnded vol tage. i ni tiati ng auto start of
diesel generator H Diusel generator tripped aoain on
degraded voltiise Caused by improper lUitch alignment
« Tenneasae Vall»y Authority I30/0//55 2pp
T Hearing transcripts on non-antl tTU\t (natters
BOQ7240091 Transcript Of H007n hrinfing nn -itatus of facilities In
Washington. DC l>p 1-?1
« Commission SO/07/15 3|pp
B007P90003 Forwai-d. LEH BO-&MK/O3L-0
CALHOUN.vJ H Tennessae V*)l.i> Authority
DOCKETED ITEMS
10 7 2100 Z"l I oruartK I 1 1, t of vitiiL iiru,!* !, oquiiimpiit
vital iiren iinali)£ i ; conducrpil d t fricilitij !, e oninu
printout cniilatnina -support i ng data for vit.il are
Ends ulthhold <rof !()( |-R2 7ryfH
U'PIIinO, TA Uput-atiilo llnai Ltir-. BrLmcli E!
slllt,,,g
80Q7!.7O'XiO Application tn amend Licenses DPH-52, changing Tech Spets tn
flccQUimottatc Reload 3,Cgclt 1 operation Requests that
approval of proposed change b-e given bij BOI010 to avoid
impacting sLheduled startup
HILLS, L M To nil I- 5 see Valley Authority 80/07/14 2pp
-8007170966 Proposed Tech Spec
Heloa-d S.CijcJG <l operation
« Virginia Electric & Poue
rhanges for License DPR- 52 to attomodat*
Co BO/O7/11 IBpp
30/2SQOr'tl Cnnfirrae tlinl LftRI ui 1 ] tonrlurt v, ta 1 .iroa analyns of Units
G li J on, 000/14 t riMilxjurtu ', J Ft.ind will conduit visit
IPPdLim T A npnrntlntj Ru.Ktura nr.inrh 2 BC/07/O3 2pp
10/JtlOO/il lie mil i! its i oiiFlrmaliuti of .iVre<>fliiMil ta participate in program
lo BiamlriB inirlli unll of reni tor- Iild(| t< reviou rncouls T-E
tc-sts -un Pirn prolcr tian tyg por romm L-5S i on (]i d L>P CLI BO-21
Also roquosU thfil l\ntnd Info be av^iilriblc for NflC visit
LISENHUT, DC niviitnin nF I IceTinlng BO^O7/16 Hpp
Ad jud 1 rntorv c
] rorwardo CiimmlaiiiDn EJOO327 rnarn-uraiirtuni t. ortlCT containing
decisions oil UCLj ?f]03(ffi petiljdn for rac una i dcra tion of
7D04K1 momDi iiiHlum *i urdcr IJLb 771101 petition sought action
re Tire protection for electrical fall! PS
CIGENHUI.D Q Division of Ueoiififcng. PO/Oft/ED Q9pp
c arr*>c|innd«nci)
307170330 ripressan concern >-E pl.sns to tonLtrucl li>iu level uaato
itornon tc incinu-rnt inn Fntilttij I'roim-auiJ f.ncllilv lunuld
proseiit -sijnifitnnt hwalth rlukt to hiuhHv populatHct area
Re-qupatB puljlif liDuilng f< Cl'l
HOLLINOhHPRTH ftPFIJlntlon Unhfioun DD/07/DV Ip
B00717057fl Supplemental fiaload Licensing Submlttol For Erotiins Forrij
Nutlear Poiuur Stati on, Un i t 2, Reload 3 "
HILF.C L , ENGELiR E General Eloctnt Co . Y1003JO1A12
Fnrusards [iroposed changes to ETS Section 2 1 re thermal
•d i Bchargo limits
HILLS.L M Tenneesei! Vall&ij Hothontg HO/O7/I4 Ip
8007220377 Prapnsed change to ETEJpBection 3 1 rt
1 1 mi ts
" Tennessee Vol ley Author tty SO/O7/M lp
thermal diacharut
00075 4 O22& Forwards Amends 61,56 S, 33 to Licenses DPR-33, DPR-H2 t<
DPR-6Bp Tespet t ive 1 ij !f notice of isiuanct !< aval labl 1 i tij
1PPOLITO, T A DpBpating ReactoTB Branch 2 BO/07/19 3pp
— 8007340231 Amends dl. Si & S3 to Llccnsea DPfi-33. DPfl-52 t- DPfi-iQ,
reapec t-i ve 1 y. chang Ing Tech Specs TO thermal discharge
limits
IPPOLITB.T fl Hperating Roactars Branch 3 80/07/13 13pp
—BO 0724 O2 31 Notice of Issuance t< availability of Amends At,9A {< 33 to
Licensts DPfi-a3. &PR-53 & Df'R-AH. respec ti vel g
IPPDLlTf], T A Operating R pact ore Dran-ch 2 OO/07/15 2pp
Inourance d ind&ronltij Infnrmiition
)070IO'116 FitriuariU t-lnJorDOdiorib 31 to ANI Polity MT-17H
FICLBERi J Mar oli !. MLl.oniinn, inc , M t. II Hut 1 oor ConEU ] tants, Inc
Div GO.'Ou/Sa app
BOD73OOSH4 Responds to end BOO&O2 memo re lou level waste mgt at
Patilitij Util plnns to construct tuio separate lou level
uiasbp Facilities on&ite Const on first four cubicles began
rctuntly NI1C ^pp-rova) of plans necessarij
UENTONi H ft Office or HjclDiir fteactor Flejulation, Director
00/07/33 Qpp
norwards EnilnrGomoitL 43 ta MAELU F'olicij Mf-ift
riCLI)E:R,J Harsh (. McLaiinan. Inc , M fa H Nuclo.ir Consul tants, Inc
Dlv 00/07/21 2f.p
Operating
slajn do-cumDnln f. coir&nponilo-nc
0723002(3 Bummafij i.f (HIO.'O? m&ttllrin iu/Mnrk I ouinors group in lluthcada,
MD.TP revisionn to NF1C acreptanco rr-ltnrin !i outntandlnQ
ttouDo relfltlvu to Mark I ciintn Himant ]pnQ-ti)rm prugram
OBIMUS.C T Plant Sgolifm» llrnnch HO/oa/C1! 3ipp
07Q70S&n Re»pondi lo ROIHH3 1 tr irr ana a-P DDVN codr in d e t erm i n i ng
operating limit mln crllUgl (inwor i-ntlu Utl 1 req.uent»
Furthor clnr i flifltian fit t« ported punaltioB ttiot mng be
lmpo»fltf nn top of IIOVN CMlrulntlart*
MlULfi,! M Tonn*Ba«B Vnllrnj Authority I30/OT/2R app
07020711 neopondi tn F1061M Itr re Inu level nii>i;tD mat at plant
Ultimata utii uhjHiitlv* is lo prnvlitp Por uii9it« rariu.tote
atDrojo- No tnijpt iJatm fioti bciin eitulil lakna by TVA fo-r
submitting opp I idi 1 1 cm fur inr I nurat L on apjirovnl
HQVAK, T H AstHUnl Dlroctnr- Par flpcf. Ji t ino SJertcturs D0/0i^25
3|>p
070QOBO6 RsJiflondw In IJHC (JUOSi-'H pnqueut fru Poc 1 1 1 tg partU t pat i on In
ptia»e liuo Inter im f<»llab i 1 itij rvituatloii fmnrom Urges
dpPiniLlve innilu'iion of p-lmo-fr onu CioParn continuing Outline
nf critical nrvut in be rifsnlvoil nnc 1
H1I10.L M TenneuMni Vnllnij Authnvltij IKVOA/JO 3pp
070tlo:iDft Racpandu to NHC 79100^' Itr tu ntJ HUH 1 1 1 pnnota I, 79103) t tr
IB ulll lltll tunils A] lotrttui) fur Marli I ownitro group
full-stain t»«t PxiClUtg vrigrntn HchtUula fDT cnmp 1 ifl i nn of
plant- uniqiiD analijBlr, for ttii umina
1IlLB.t- M fnniioitBu Vflllci, Aiitlior i ti/ BO/P//OI lp
•07HIOOH/I Foruanli renuaBt for all-ill info to EOtfiplata r-ovlou of
cuntainne-nt puii|irig li venting at farHitir-a
H Ai»LKtnnt DlrerlDi fir Opflrotinfl RHMttorE BO/07/'OD
6007300371 Requpats summary of util alanii to build loui level uiastc
atarage Facility Also requests whether NRC approval is
required it uihethcr public hearings have been requested
DF1ADFDRD.P A Commission BO/0&/0-3 Ip
Insp ffct i on ropartn. IE Bulletin!
rrespomi en ce
Faruiards 1C Info Notice 80-SO, "Loss of Decay Heat Removal
Capability at Davi E-Desse Unit 1 Whilff in Refueling Kode "
No r-eaponsif required
O'REILLY, J P Region 2, Atlanta. Office of the Director HO/03/OB
G007I10476 Fopiuards IE Bulletin BO-13i "Cracking In Core Bprag
Spargers " Urltton response renuii-ed
O'REJLLV, J P Region S, Atlanta, Office of the Director 00/05/12
lp
EOO7OB0192 ForuariU IE Inf& Notice 00-23. "Breakdowns In Contamination
Control Programs " No written resnons? required
O'flEILLV.J P Region H, Atlanta, Office of the Director BQ/09/Bfl
IP
El 007010225 Foruiards IE Into Notice BO-33, "LoaK of Suction to Eraergsncij
FseilunlBr Pumps " No written response required
O'REJLLVrJ p lleglon 3, AtlflnLa, Office nf the Director BQ/05/29
lp
rorwarila IE Info Notice BO-26, "Evaluation of Contractor
OA PTJJ grants " No written response required
0'IJEIL1-V. J P Ri>g>on S. Atlanta. Office of the Director BO/06/10
D007140aOii Foraards IE Bulletin BO-14. "Dagrado-tlon oF HVJR Scram
Dticharga Vol Cnpalilliti) " Wnttsn response required
O'REII-LY. J P Rfloioi> 2. Atlanta, Offica of the Director SO/06/1S
Q007O20fl99 Torwarda rpsnaneo to TE Bullotin 80-09 transffli tted by
JP 0'Rellly aoo-117 Itr Final root For Hartsville !< Phlpps
Elcnd plsutB ufcll tip sent on or beFore 901017
HILLS.L M Tonni's-iec Valloy Authority 80/Qfc/16 3pp
DOCKETED ITEMS
8007O2O76J Forwards IE Bulletin E10-1S. "Possible Loss of Emergency
Notification ays ICNB) U/Loss of Dffsite Puucr " Written
response required
O'REILLY.J P Region 2, Atlanta, Office of the Director SO/06/1B
lp
B007020391 Forwards IE Circular 80-15, "Loss of Roacbor Coolant Pump
Cooling & Natural Circulation Cooldouin " No written response
required
O'REILLY.J P Region 3, Atlanta. Office of the Director SO/06/20
IP
000731034-1 Forwards IE Insp Ftepte 50-339/flO-;!5, 50-2iGVBO-19,
30-296/BO-20 I. 50-327/00-22
O'REILLV.J P (legion S, Atlanta, Offire of the Direttor BO/06/23
3pp
— BO07310351 IE Insp Ropts SO-259/BO-25. 50-360/BO-I9. 50-a96/aO-SO !,
30-327/00-23 on aOOSSl Insp tonnlsted of Enforcement meeting
In Atlanta. GA to discuss eiceeding DDT radiation limits
during shipment of raduaflte from Drouna Ferry
DANCEi H C Region 2. Atlanta. Reactor Operations Nucloar Support
Branch BO/06/20 2pp
— 8007260484 IE Insp Ftepts bO-J')9/SO-EO, 5O- JdO/BO-15 !, 90-294^30-16 an
000405-0502 None amp li ant ft noted f rii IDI c to adhere to
sur vp 1 1 1 anc a instruc t mnt *< to 'nokp prnjiipt re-pt to NftC
SULLIVAN R F , fHrt'iE.J W Rpgicin d, Atlanta. Office of tli e
Director DAMCk. H C Region P1. Atlanta. Reactor Operations
Nuclear Support Branch HO/05/20 /pf
Q00725O596 Forwards response to item I at- IE Bulletin BO-17 re water In
scram discharge vol No significant amount c-f mater was
found in discharga vol '• astoc lated piping Scram discharge
went valve? are aperalile
CROSB.J L Tenncss.ee Vflllixj Authority BO/07/11 app
800731OO67 Forujoi ds second interim rept in response to IE Bulletin
8O-O6 Since 80061.? interim i aft, iiti ) cumpleted review af
primary containment sys.re.jttor protection sysiRHn ey; ti
core spray SIJE Evaluation of othci sys underlay
CROSS. JL Tennessee Vallu'u. Authority 20/07/11 2pp
B00722Q53.J Request-* eitension until BOOS]] for performing manual !<
autotnfttlc scram required by IE Bulletin BO-17 Eitension
needed because of current boat uavc
MILLS. L M Tennessee Valleij Authority SO/07.M6 Epp
B007170070 Forwards IE Circular 00-1-1. "Radioactive Contamination of
Plant Demineraliied Water Sys b Resultant Internal
Contamination of Personnel " No written rebponse required
O'flEILLV-J P Hegion S. Atlanta. Office of the Director BO/06/24
IP
SO0731030B Forwards response to Items 3 (Unit j). 4, 5, ft( c )• !• 7 of IE
Bulle'tin 60-17 Present 5tnnd6y liquid control 5<J5 dOBign IE
unable to support tuo-pump f]ou but Mj9 [a eniiipped u/
interlock ing contacts Item 2 fur Units 1 & 2 mill be.' sent
MILLS, L M TenneiBoe Valley ftulhnnty BCV07/1A lOpp
6007180523 Forwards response to IE Bulletin 77-27. "Loss of Han-Class
IE Instrumentation & Control Pauor Syg DUE During
Operation, " d to 800404 confirmatory orilors Foeduatsr pump
turbine b main turbine trip circuitry will [IB upgraded
MILLS.L M TennosBCB Valley Authnribij 00/06/26 Bpp
8007230233 raruards IE Dulletin QO-lfi, "PotentiBl Misapplication of
Roaemount lie Models 11B1 Ei 1132 Pressure Transmitters
H/Eitber A or D Output Cades " Hrltton response required
IE Circular 80-16 also nncl No uvitte'n response required
O'REILLY.J P Region 3, Atlanta, Office of tho Director 00/06/27
lp
B007210091 Foruards ppsponso to IE Bulletin BO-10 Potable water,
mineraliied uater ti auiiliary boiler sys have possible
interfaces between nonradi oactive It radioactive BIJB Routine
sampling & analysis prngrem established
MILL9.L M Tennessee Valley Authority BO/07/07 3pp
0007230736 Foruiards monthly status ropt re IE Bulletin 79-14. "Seismic
Analysis for As-Built Bat ety-Rolatoi! Piping Sijs, " prenonting
status of uork as of 800701
MILLfi.L M Tennessee Valley Authority 00/07/07 H7pp
0007280104 Forwards response to 16 Bulletin 30-11 Hesponfie includes
gunaral arrangement draining Indicating masonry uialls of
concern 1 equipment in approximate are-a of uall W/o end
FUfin.B d, Carolina Power EC Light Co BO/07/07 lp
B0072BD&15 Responds to IE Bulletin BO-OB. "Elimination of Containment
Penetration Melds " Results of Investigation end
MILLS, L M Tennessee Vail eg Authority BO/07/07 !>pp
8007210103 forwards response to IE Bulletin 80-11 Identifies masonru
walls that support or are near safety-related ays Submits
schedule for re-evaluation program
CflDBB. Jl- TerineiBDB Valloy Authority SO/07/OG Sop
B00729O357 Grants eitension af- time to SOOtlll for performing scram
tests per IE Bulletin BO-17
EISENKUT.D Q Division at Licensing BO/O7/1B 2pp
8O0730057J forwards response to IE Dulletin 79-01D.. "Environ
Qualification of Class IE Equipment " Summaries of equipment
qualification evaluations, baaed on End -1 criteria, entl Full
response mil! he Fnruardcd luhen evaluotions complete
MILLS, L H Tennessee Vallpy Authority 80/07/1B 5^pp
H Periodic operating reports !> retnted torrespoudenc i
B0072aO')'13 Porurards "Effluent i, Hasto Disposal SBmiannual Rept."
supplemental info for second half 1973
OEWEASE.J 0 TpnnestPE Valley AuthniHij 77/03/15 lp
— 80072a04AJ "Effluent k Waste. Disposal Eominnnual Rept," supp 1 emental
info for socond halt 1970
* Tennessee Vnlley Authority 7^/02/15 15pp
B007S2O34E! Forwards "Effluent !< HuaCa Disposal S&mi annual (topt, "
supplemental info, first half 1979
ABEKCRQMUIE, H TennoSsoB Volley fluthnvitu 7?/OB/I7 lp
— BOQ7320346 "Effluent !i Waste Dispussl Sum) annual R«pt, " supplemental
Info, first half 1979
» Tennesseo Valley Authority 79/OR/l/ leipp
3007230-181 Forwards "Effluent Sj Haste DiBpDsaL Semiannual Hopt.
Supplemental Info, iJocund Half 177? "
ABEnCROMDie.H Tmnessee Valli>u Autlimitij 90/01/31 lp
— 8007320491 "Effluent !- Wsstt, rjiEpc-sol Semiannual Rep t, Supplemental
Info, Second Half 197? "
ft Tennessee Valley Authority aO/O!/3( 16pp
B007200460 Ac k receipt of 000616 Itr informing NHC of stupa taken to
correct violations noted in IE Insp Dupts 50-239/80-20.
30-260/80-13 fc SO-296/BO-16
LEWIS, R C Region Si Atlanta, Hose tor Operations Nuclear Support
Branch BQ/07/09 3pn
— B0072B04A0 Responils to NRC 8003BO Itr ro violations noted In Insp
Rept! BO-2S?/00-20:3Q-260/BO-l3 « 30-H9A/BO-16 CorrettlVB
actions calihr valve orientation corrected Justifies
decision re nonreporting nf delsel genrator failure
MILLS, L M Tennessee Vnllei) Authority 00/06/16 flpp
— B007200473 Forwards IE In»p Repts 30-239/BO-20, SO-Sc.O/00-lS t,
80-296/HO-16 on B00403-030E t< notice of violation
LEWIS, R C, Region Hi Atlanta, Reactflr Operations Nuclear Support
Branch 80/05/20 2p|>
— B007280470 Notice of violation from Insp on BOD403-OSOS
* Region 2. Atlanta. Office of the Director 00/05/20 lp
HOQ716Q532 ForujardS monthly aperatinjl repta for June 19QO
ABERCROHQIE.H L Tennessee Valley Authority 80/07/10 lp
— 8007160396 Monthly operating i-ept* for June 1TOO
THOM.T , GREEN. D Tennessee Valley Authority 90/07/02 33pp
B Reportable ociurrences. LfcRs ti rploted coiresponflonce
fl00711O291 FtCl-BFRa-BO-360/fJOJl on BO'dftl?. Dfi'Sier InilufitriB* safety
valves identified ni possibly having guides w/ tract 5
Condition identified in similur valves loanifd to another
util from Brawni Forry Cduie unknown
ADERCDEHG!E,H Tennessee Volley Authority HO/06/17 lp
H0070B0394 Forwards LER aO'OBO/03L-0
CALHBUN.J R TenneBsee Valley Authority
DOCKETED ITEMS
— 30C7OS03'?1) LfR HO-023/Q3L -O on BUOiiOV. tfun 119 normal operati on, 2A
reactor T u-r ir-r irlnt i on inolur senerator set trlpp-ed duo to
0eij*ratnT s>tdtdi temp high reljy uttuatiun Probable cause
was loose uirt' caused1 by ^ibn-stion
* TunmessEi; Valley Authority 80/0(1/27 Ip
0007230097 Requests Bubmittal of proposed Tech Spec changes providing
For redundancy in decaif heat removal capability in all mode a
of operation Model Tech Specs which mould provide acceptable
resolution one 1 for guidance
EIBENHUT, D O Division of Licensing 00/06/11 &2pp
50D7QBO105 For
CALHDUN. J R
rds LEU flQ-022/OJI.-O
Tennessee Valley Authority
-8OO7OQU-H1 LEW BO-02?/O3l -O on BOOiO2, iu«i 1 1 e pel-forming S ! 41 A-14,
turbine first stag a pressure pt'rmi 651 ve press ure suite ties
PB-1-91 A !< If !. l'S-1-91 A !. B setpoints eiceedod Tech Spec
limits Caused dy switcli drifting
» Tennessee Valley Authority BO /Oh/27 2p p
QQ708Q370 forwards LEU BO-OSSi-OJT-O
R Tennessee Vslleu Auth
BQO7I00150 Forwards Amend 47 to License DPR -33. safety evaluation &
notice of issuance ft availability
VAR8A. S A Operating Reactors Dranch 1 BO/Oi/13 2pp
— 3007100156 Amend 47 to Licence DFfl-23. al lowing blockage of channels
When RCS pressure less than 2i 000 psig
A Operating Reactor!. Branch 1 80/O6/J2 4pp
BO071OOI63 Safety evaluation supporting Amend 47 to License DPR-23
EGt.O technical rept encl
» Office of Nuclear Heactpr Regulation. Director BO/Ofi/13 9pp
-BOO7QBO373 1.EF1 SO-O25/Q1T-0 an BOIK>17. during normal operation
discovered that apare Dresser Industries safety vfllvfr bad
guide u/cracfe^ f.iused during initi.il pouring of casting t
subsequent rntiling Addl valves will li o inspected For cracka
» Tennessee Valley Aifthonti| 9d/0(ii/3O 2pp
0 Foruiards I, PR BO~O3lyO3L-0
. -J R Terinossoe Valley Authority
8007290726 LEfi 30-024/03L-0 on 3006S4, ilur ina rod seJjuenee enhance u/
unit al 4C)i pnuei , control ro-d 1O-27 Failed to latth after
insprtson t. drifted out -kihen insert 1 od released Caused by
failure of directional v-alvp B5-flOC Valve replaced
« Tennessee Valley Authority SO/07/23 £pp
Hear inc. transcripts on non-antitrust riiii-ttcrt
D734CQ91 TronBcript of &OO7 1 5 hrlpfing or. atfltua of facititi?s in
Jashfng ton, DC Pp 1-21
Cornrai s 5 ion SO'07/JI 21 pp
:KET 90-261 n o ROBINSDM F'LAMT, UNIT s
Eetunty. modicalr emergency *. fire protection plans
7020330 Foruiards. request fur 3ddk info d revisions for safeguards
ontinoancy plan s-ufinitted un 790323 InFo ahauld be provided
(thin 10 dfli/s of recpipt of Itr Hequest withhold
ref 10CPH3 790)
ABOA. S A Operating Reactors Branch 1 B0/03/E1 2pp
7010P07 Responds to NBC SQOSJ1 reauost far addl info re 790323
aFgguards E on bingencij plan Info uill be submibteri by
"OBOI
TtEV.e r. rai-olma Pouer I. Light CP 80/O&/37 Ip
70 1091-1 Reipo-nds to f30O6O4 rtquo^t for addt mpo re administrative
intruls For fire pTotection Util will develnp program
dherlng to roqin rements
FLEV.E E CarolirtB Power t« Light Co BQ/Qh/37 Epp
— BOO71OO163 Motice oP issuance Ji availability of Amend 47 to Licenie
DPR- 33
VAFIGAiS A Operatino Heartors Branch 1 BO/06/1S 3pp
B007O1O3B1 Fnrmards responses to DS Elsenhut B00907 info request rB
final recoftimendatl ons of Bulletins b Orders Task Force
UTLEV.E E Carnlina Pouior J, Light Co BO/06/37 2pp
6007250001 Requests submittal of application for amend to license
consisting of Teen Spec changes d license conditions PWfl
Model Tech Spets ti Model license conditlone For TMI-S
l-B59ons Learne'd Category A items encl For guidance
E1SENHUT.D 0 Division of Licensing ao/07/03 69pp
B0071SOi26 Responds to iNRC BQ0602 request to modify administrative
procedures to limit auiiliary fceduatur Flow Util ui 1 1
revise procedures to limit pump operation following
postulated steam line break & prior to isolating component
UTLEV.E E Carolina Pouar t, Light Co BO/O7/09 3pp
B007330420 Correct* i nsccurac i et. in NRC B0041Q evaluation of
Category rtj TMI-2 Loseons Learned Task Force items
implementation Ho equipment is required to implement interim
emergentij sampling procedures
UTLCV.E E Carolina Power ft Light Co BO/07/32 Spp
eoO72BO679 Submits schedule for refueling Facility for Cycle B
operation ECCS analgais being performed to allow for up to
107, steam generator tube plugging in event steam generator
innp program indicates addl tubes need to be plugged
UTLEY.E C Carolina Pnuior S, Light CD 80/07/33 2pp
8007390670 NotiFios that revised radiological effluent Tech Specs uill
be BHbmittcd -by 8O1O3? per NRC B00602 comments t. 800701
meeting discuss ions-
UTLEV.E E Carolina Pouer t< Light Co BO/07/23 Ip
aa073fOfiBb Foruiards addl info re adequacy of station electric
distribution sija. va\ tagesi in response to BOOiOS Itr
Dcsci-llies undervoltage relay trip setting For Class IE 480
volt husesi spare- startup transformer & oPPsite sources
UTLEV.E E Carolina fouier fc Light Co BO/07/23 7pp
310343 Foruat-ds Commission BO0127 memorandum *. order containing
•cistc-ns On UCG 7BO5O2 petition for r DC ons i d Brat 1 on of
0413 meraPTifntfliiro !, order UC3 77110^1 petiUmi sought action
fire protection for electrical cables
SENHUT, D G DIM B i on of Licensing 60/06/25 H7pp
inane ml Inf ornta t inn
1200H ITPSponcfs to HQOSOH rmqunat far commrnt on util 3-7
gistration btatemont FJcvieiu identitipd no maccurnte
atemants le HfiC re^l uteitorij i oqutrcments or financial Info
led w/NRC
11STENBURY,E MfdriugG Division trO/05/37 Ip
dniumontE r. corrpspondnnc o
1013li ReipoinJs to BO03tB Itr re NRC position On util approach of
lying AJF position jjdUer for proriirement of oFF-thc-snol F
me HtIC dons riot concur uj/titil approach Pr-nLuremcnt of
ire -or rcjilacpfm-nt parts *ubj tn OA rnntrois
iSS.W P Oi'aHtij Aasmrancc Hranth 90/O5/E3 2pp
BO07310517 Sumnsry of 30O701 meeting u/utll in Bethesda. MD re
proposed radiological ETS
NEIGHOORB, D Operating Reactors Branch 1 60/07/23 3pp
Q Inspnction reporta» IE Bulletins & correspondence
H007540I13 Foruards IE Info Notice 8Q-20i "Loss of Decay Heat Removal
Capability at Dnvi i-Dtiase Unit 1 Uhlle in Refueling Mode "
No response required
O'WEILLV.J P Region 3, Atlanta. Office of tha Director 80/03/08
9007020137 Forwards IE InFo Motice BD'SS, "Dreakdoums In Contamination
Central Programs " Mo written response required
O'nEILLY. J P Region S, Atlanta. OPfito oP the Director 80/05/20
IP
80073 lOt S3 Forward a IE Circular BO-13, "Orid Strap Damage in
•WeEtinghouse Fuel Assemblies " No uirlttefi response required
O'REILLY, J P npolon a- Atlanta. Office of the Director 80/05/28
0O07O1O179 rpruards IE Info Notice BO-a3, "Loss of Suction to Emerosncy
Feediuater Pumps " Mo written response required
O'HEJLLY.O P Region 2p Atlanta. Office of the Director, 80/05/39
DOCKETED ITEMS
HOQ7O200B7 Responds to IE Bulletin [10-06 Revieu of control miring
diagrams of safety-related functions confirmed that
emergency equipment uioulil remain in emergency mode upon
reset
FURR," J Carolina Power I, Light Co 0Q/O6/1O 3pp
9007210032 Foruards second rc-ipunse to 1C Bulletin 79-01J3 Includes
environ qual i f i rati on data Jiased iipon investigation to date
Efforts to obtain nvailable duta from NSSS supplier are
underway H/o end
EURY,L U Carolina Pouer (, Light Co 8Q/Q7/O/ ip
8007320043 Forwards IE Info Notice 80-36. "Evaluation of Contractor
OA Programs " No written response required
O'REIL-LY.J P Region 2, Atlanta, Office of the Director 00/06/10
2pp
8007160223 Forwards IE Info Notice (30-27, "Degradation Of Reactor
Coolant Pump Studs " No specific action or response
required
D'fiElLLY,J (J Region 3, Atlanta. Office of the Director QO/O6/11
IP
HO07Q2O743 Forwards IE! Bulletin BO-19. "Possible Loss of Emergency
Notification Sya <TNB) W/Loss of Off silo Power " Written
response required
O'REILLY. J P Region 3, Atlanta. Office of the Director 00/O6/IB
IP
BO07J00031 Submits revised schedule for response to IE Bulletin 79-0 IB.
"Environ Qualification of Class 1C Equipment " Rept will now
be completed as soon as all available info is obtained
FURR.D J Carolina Pouier l< Light Co 00/06/19 Ip
R Periodic operating repolts
BQ07150621) Foruards monthly oppra 1 1 iig rept for 19QO
ST^nhEV.R D Carolina Pouier >: Light Co BO/Q7/1O Ip
—0007150633 Monthly operating rept far June f>BQ
UATFOflD.M Carolina Power '< Light Co BO/07/02 5pp
b Reportflble occurrences, LERs. *, related correspondence
BQ0701040I LEH 79-O27 has been cancelled
« Carolina Pouor & Light Co BO/O6/30 Ip
B00701010B LEfi 79-023 has been canrplled
* Carolina Pouier t, Light Co BQJQb/30 Ip
3007010410 LER 79-023 has been cancelled
» Carolina Power !, Lirjht Co BO/Oii/30 Ip
BO07Q20440 Forwards IE Circular GQ-15, "Loss of Reactor Coolant Pump
Cooling, fc Natural Circulation Cooldown " No written response
required
O'REILLY. J P flogion 2, Atlanta, Office of the Director BQ/06/ao
0007100093 Forwards IE Insp Rapt 30-^61/130-12 on BOO610-I2
No noncompliancu notnd Details withheld Iref 10CFR2 790)
HENNA, W D Region 2, Atlanta, Safeguards "ranch 30/06/20
BOQ7010461 LEIi 79-013 has been cancelled
* Carolina Pouier !i Light Cu BO/Oi/30 Ip
B0070t04fi6 LE(! 79-021 has been cancelled
* Carolina Power & Light Co BO/Oib/30 Ip
BOO752044O Forwards LER BO-OH/O1T-O
BTARKEY.R Q Carolina Pouier St Light Co 80/07/li Ip
— 0007100095 IE InBp Reut 50-361/90-12 on QOOMO-12 Na noncamp 1 iance
noted Major areas inspected security ornani lation Details
withheld (ref 10CFR2 770)
OILLEBPIE.F P . MOORE, D E , VDiiSE! J Y Region 2, Atlanta, Office
of tho Director 00/06/20 Ip
— B007J30445 LER 0O-014/01T-0 on 8007O2. deterrninerl no certification oF
qualification available for PVC electric cable pigtails per
IE Bulletin 79-O1B Cauie not stated Test to be conduited
assuring pigtails ability to perform required functiun
STrtRKEY.R B Carolina Power ti LJ^ht CD BO/07/16 5pn
B0071S0007 Ack rticetpt of 000609 Itr informing NFIC of steps taken to
correct violations noted in lit Insp Ropt 50-261/BD-09
KENNA,W D Region H, Atlanta, Baffguards Branch 00/06/24 Ip
--B0071S0097 Responds to NRC 000314 Itr re violations noted in IE Inap
Rept 30-261/60-09 Attachment A describing corrective
action withheld (ref 10Crn2 790)
FlfHR.B J Carolina Power t. Light Co BO/Oi/09 Ip
--8007130101 ForwardB IE Inap Rupt 50-261/00-09 on B00121-2S S> notice of
violation Notice of violation withheld (ref 10CFR3 790)
HENNA- W D Roglon 2, Atlanta, Safeguards Branch BO/05/14 3pp
— B0071301O7 IE InBp Rapt 30-361/80-09 on D00421-29 Noncomp 1 lance not»d
intecuro grotiis !< hatches provided unauthoriieil accoss into
vital area Details withhold (ref locma, 7901
QILLE8P1E, r P Region H. Atlanta. Safeguard* Branch TILLMAN. A .
HOHELUJ C RBnion 2, Atlanta, Office of the Director BO/OS/14
Ip
V Operator Eiaminati ona
BOD7220426 Forwards revised training programs for instructor
requat i f icati on program ^ operator rBrj.ua! i fical ion program
STARKEY.n D Carolina Power t, Light Co BO/07/11 3pp
-B007220439 Trainin(j Instructiun 2O1. Revision 4, "MB Robinson Plant
Operator Replacement Training Program "
» Carolina Pouer !. Lirjht CQ QO/OS/l-J 9pp
-8007220433 Training Instruction 2Olfl. Revision 4. "Training of
Replacement Reactor Operators for fJRC Eiamination W/D
Reactor Startup Demonstration "
B Carolina Pokier •. Light Co 90/06/27 16pp
-0007S2043S Training InstruLtion EOS. Revision 0^ "Seoior Reactor
Operator Replacement Training Program "
» Carolina Power !i Light Cu SIVO5/25 lOpp
00O7160BOO Forwards IE Circular BO-14, "Rfldioactive Contamination of
Plant Deminoraliiect Hater Sgs d Resultant Internal
Contamination of Personnel " No writ ton response required
O'REILLY.J P Region H, Atlanta. Office of the Director BO/06/24
-H007330433 Training Instruction 903. Revision 0. "Instruc t-ors
Requal if-ication Program "
« Carolina Power i. Light Co BO/O5/29 lOpp
B007330230 Foruarda IE Dullstln QO-16, "Potential Misapplication of
Roeemount Inc Models 1131 tc 11S3 Pressure Transmitters
W/Either A or D Output Codes " Hrlttsn response required
IE Circular B0~16 also one 1 No written rcaponsn required
D'REILLY.J P Roolon 3, Atlantar Office of tho Director 80/06/27
3007220354 Responds to IE Bulletin 00-10 Review of facility design !
operation complete Bampl ing, analysis & mom torinrj program
established New or rovisni) procedure implemented
FURR.B 0 Carolina Pouier (• Light Co BO/07/O1 Ip
BOO72a0227 Respond* to IE Bulletin BO-OB Facility has no fluml head
penetrations in containment Holds are fillet (' were examined
by magnetic particle method during const
FURfi.n d Carolina Pouier tt tight Co 80/07/03 Ip
DOCKET 50-263 MONflfELLO NUCLCrtR GENEriATINO PLrtNT
F Security, medical, emorgencij !< fir-p protection plans
8007010372 Forwards BNL fire protection TEVIBU re diesel generator room
automatic water suppression syi !> c ao 1 e spreading room gas
suppression aus Tor facility
HALL.R E Orookhaven National Laboratory 30/06/24 3pp
B007010331 Submits rlpstiiption oF raotni Generator sot room vent duit
fire proofing required by five prot&ctjon safetij ovaluation
Main vpnt duct & duct branching intt. main duct will be
covered with 2-mch layer »f Pyrocrete ?-l i
MAYER, I- 0 Northern States J-ower Cn BO/06/B5 Ip
0007010335 Submits description of fire stops between Fire Zones 13C b
19C, required 6y fire proteition EafetLi evaluation Commen.ta
on proposed desipn should lie lonveyeil by BOOH15 to comply
u/uork schedule '
MAYER. L 0 Northern Btrftos Pnuer Co Q0/06/2ii Epp
62
DOCKETED ITEMS
8007010311 Describes chanoes planned Far Fire protection safety
evaluation se-ctioiv- re c urami tmunt to provide capability to
cool HHR pump seal coolers via emergent j avc water sy-s
Forwards drawing of interconnection schematic
HAVER, L 0 Hot- thorn States Pnuier Co 00/04/37 3pp
BO0728Q4+1 Foruard* addl info t-e fire protect ion safety evaluat i on
Control room fire dete-c tors, fiose stat i-ons- add 1 Imse a Fire
pumps are addressc-d
HAVER, L Q Northern States POLJET Co BO/Q7/IH 4pp
BOO7aB039l Submits design change la fire protection safety evaluation
Item 3 I 1EI21. "Fire Buppresii an Gijs I ntEsrtonnet ti on "
Turbine bid 9 end of interconnect! on ] Ine lull! remain
pressurlied as supply fnp sprinkler curtain
MAYER. U 0 Northern States Power Co 80/O7/31 1 (I
60072801 OS Discusses licensee revive of alternate 350 volt flc payer
source in HPCI i reactor core- isolation cooling sy&
Independent saurt* For HPCI is. required to assure HPCJ
operab 1 1 1 tij in eve-rit of Fire in * listing battery si/s
MAYER, L D Northern States Power Co BO/0//32 Ip
0 AtJ judicature correspondence
B0073I02''13 Forwards rnmrai fisioti (100S27 memorandum & order containing
decisions on UCS 7805O2 petition for recons i d erat inn of
790413 memorandum i< order UCS 771101 petitiiin sought action
re fire protection For electrical cables
EISENHUT, D fl Division nf Licensing 90/06/33 BTPP
P Operating license stage docurriont* ?< correspondence
BQ07230G28 Summary of G00207 meeting iu/HaTt t owners group in Beth-os-da,
MB, re revisions to NRC acceptance criteria Ii outstanding
issues relative to Hark f contaminant long-tflrrn program
GFIIME8, C T Plant Systems Branch BO/O3/3] 31pp
EOO71BO1QO Forwards Riwision 6 oF "ASME Code Section XI Inservice Insp
ii Testing Program t. InFo llu'quired For NDC Fieviem of Request!
for Roliof from ASME Code Beitlun XI Requirements "
D Northern State! f'owar Co aO/07/lii 2pp
— 800710030*. Revision 4 of "ASME Code Bectl-on XI Insorvice Insp t Testing
Program !, Info Required POT NHC Review of Requests for
Relief from ASME Code Section XI Requirements "
1 northern States Power Co BO/O7/16 31pp
BOO72B0410 Forwards comments iin NURE8-O577. "Fracture Toughness (,
Susceptibility te Stress Corrosion Cracking of Equipment
Di'pportb, " In response to NHC BOOS 19 request Aifdl analgsia
fur stress corrosion cracking IE unnec eHSiiru,
HAVER, L D Nottnern States Pouer Co BQ/G7/21 5pp
B0073804ii9 Forwards NUTECH -evaluation a* low pressure turb ino roll
Results con-firm earlier belief that pro-cent sijs
limitations a&soc i ated u/ 111 termed iate range monitors
cause A-00 pal turbine roll Mods under review
CLARITY. H II Wnrthcrn St-atee Poyer To BO/07/21 16pp
0 Inspection reports, IE Bulletins & correspondence
B00714O932 Forwards IE Bulletin BO-13, "Ct-acHng in Core Spray
Spargers " Written response required
KEPPLGRpJQ Itegion 3, Chlcngo, Office of the Director BO/05/13
IP
8007020054 Forwards IE Info Notice 80-23-, "Brenli-dDuina In Contamination
Control Programs " No written response requiroil
HEPPLERjJ 0 [legion 3, Chicago, Offic-D of the Director BO/03/28
BOO7OI0127 Toruards IE Info Notice BO-aX "Loss oF Suction to Emergency
Feeduater Pumji s " Mo uritton rE^punse required
KEPPLtH, J G Hogio-n 3, Chicago. Dffic* of the Director 80/05/B7
BO07030322 Notifies H!tC of intention to ship, radioactive m<itl tram
facilities using Mold HN-6GO
HAVER, L a Northern States Power Co SO/Ofc/13 Ip
BO07010335 Submits description of bflttPry room ventilation air -f 1 oiu
monltarlng instal liitior, Didgram end
HAVER, L 0 Marlhsrn States Power Co 00/06/24 Bpp
BO070£30a31 Responds to GE BOD23I Itf re list of concerns from ACHS
consultant HPCI !i reactor core isolation Cooling described
Completes fommjlnpnt re NUFIEG-OfiibO, I tsm It K 3 tt,
HAVER, L a Nortfiffrn Status Power to OO/Ofi/30 2pp
BO07I00067 Advisee that time-notion Study !< dose rate calculation Using
relevant dot-e rates completed per NUfiEO-OS7B. Item H 1 B a
New post-accident sampling station uii 1 1 be Installed
MAYER. L 0 northern States Power Co 80/06/30 Ip
8007320038 "El ectri cal. Instrumental! °n & Control 'iys Support,"
technical evaluation rept for June 19QO
CLSVELftMD.C J E0(,9 Idaho. lr.c TIN fi-ia5(, a007a300nD FID/06/30
Eflpp
8007140aH7 Forwcrda IE IiiBJi Rept 9O-263/BO-09 on BO042Q-0!)02
No nnncompl innce noted
HEISMMAN.I? F Ra|jion 3, Chicago, Reactor Operations Nuclear Support
Branch 00/05/30 2pji
— aOD7140fl9fl IE Insp Hopt 90-2^3^30-09 on B004H0 — 0303 No nonconipl lance
noted Major arOBU inspoc t e-fl plant opcrat i un»j tor us-d gruel 1
vacuum broiiliBr mod t< roeirculB-tion pump seal Failures
HARMICK, R T , DROWN. C , IlrtDlSOM, A Region 3. Chicago, Office oF
the- Dlrectur
000711001-1 roruardo IE Inap »*pt SO-EdS/BO-OA on 900321,27-30,0424-25
& t)S(J6~07 No noncompHance noted
HE1BHHAN. H F (legion 3, Chicjoo-, Repqtor- Dporations Nuclear Support
HroTicli DO/06/04 2pp
— B0071 100-19 1C Insp Flept 50-2i3/BO-Od on 000334,37-30,0434-35 fc OSOA-07
No noncumpl 1-ancB note if Major areas inspected containment
integrotinJ lost, rate test J. local teat rate trstlng
HEIGHMANiR f Reoion 3, Chicaoa. IteJictor Operations Nuclear
Eiiippot-t Di-Einrh CMOHi E T . HOPKINS. J B Region 3i Chicago' Offics
of the Director 80/06/03 7pp
B007080-36S Forwards summary of test data fe completion of EDC 7 fuel
insp ?. DOC B startup physics test
0 Northern States Power Co 00/07/03 4pp
0007320213 ForwurilB IE Info Notice BO-36, "Evaluation of Contractor
Qft Program* " No urllten ronponsa required
KCPPLEN,,) 0 Region 3, Chicago, Office of the Director BO/06/10
B00721OIB6 Forwards "Test Rept EOC 7 Fuel Insp t, J)PC (1 Startup
Phy-sics "
HAVER, L 0 Naithtrr, States Pouor Co SO/Q7/03 Ip
— HOD7310I9A "fast Hept EOC 7 Fuel Insp f< BOC B Starluji Physics "
• Northern States Power Co BO/ 07/03 anp
fl007BB005ii AdvlseB uF intention to ih 1 \\ radioactive matU frcm lutod
*---' * " "acltage Model CNSI AL-33-90
" =•-'•-- "- -- Co 90/07/03 Ip
B00714033I Foruiards IE Hullctin [JO-1-1, "De-gradation of BHR ficrom
Difithorgi' Vol Capability " Written response rnquired
KEPPLGRi J 0 riegiou H. fililcagu, Offico of the Director 60/06/12
lit
lfty f(»apoTn)s to 1C DullBtin SO-OAj "CliglnB ared Safety Feature
Kaaot Cnntruls " All Bflfotij-rBlatril aquipmBnl remains in
emergency -mailn upon roset of actuation signal w/listed
e-icep tioni
4tL.u£Fm].D E HorlhOPn States Pouc-l- Co BO/06/16 3pp
code Par
V07/07 Bf>f
0007030019 Forward 9 ] E Bui In tin CO-IB, 'Toisibl* l_o*a of Efnergencij
Natification Sivs (fttS) H/Lose of dffslt* Pnuier " Urittin
rinpoitse rEquireiJ
KEPPLCfl, J o Region 3, Chicago, Office of the Director BO/Oi/lB
IP
FOP toffimBnt
Drive Riturn
not
3pp
D0070SO&73 forwards IE Circular fJD-15, "Lo*K of fieactai- Coolant Pump
Canting & Katurnl C irculati-on Cooldoun " No written responie
KCPPLER, JO
IP
lCTi 1. Chicago, Office of th* Director
DOCKETED ITEMS
63
6007300307 Forwards IE Insp Rept 50-2t3/BO-10 on BU0920-S2 No
noncompl iante noted
HEISHMrtN.R F (legion 3. Chicago. Reactor Operations Nuclear
Branch BO/06/23 3po
S ReportabU" net
;pond(
Siippt
— 8007300309 IE Inep Kept 30-363/00-10 on 000520-22 Ho nontomp 1 i ante
noted Majoi areas inspected fire protection prevention. 1C
bulletin f ol 1 ouiupi cal ibr !< review of plant operations
BROVJN-C H . WrtRNICK.R F Region 3, Chicago. Office of the
Director SQ/06/2O 4pp
8007170506 Forwards 1C Circular 80-14. "Radioactive Contamination of
Plant Deminoral 1 letl Water Sys !< Resultant Internal
Contamination of Personnel " No written response required
KEPPLEH.J 0 Region 3. Chicago, Office of the Director 80/04/24
IP
8007210301 Ack receipt of BOOSSB Itr informing NRC of step.* taken to
correct violations noted in IE Insp Rcpt 50-263/00-OB
DAVIS. A D Region 3, Chicago. TUB! Facility t< Material* Safety
Branch HO/Ofi/24 lp
B007Q1Q531 Foriuartts l.t« BO-Or «,VOJL-i)
MAVEH,L O Not thorn (Status Pouet Ci, F]O/Oii/?t lp
— 30O7O1O542 L£R BO-0^2/031 0 on 8C0521?, p i-jmarij containment oiygEn
cuncentra tlon eiceerted 5/ by weight "leth ^ipec limit Caused
bg open svc air isolation valve to drijuiel! Procedures have
be£ih revis-ed to assure pruper vdlvp pos i 1 1 on 1 rug
SHURTB. "3 J Murthern 'itales Power to flQ/OA/^i lp
B00710D190 Fnriuaids LCR BO-US J/03L-0
HAVER, L n Northern States Cower Cn
— 0007100195 LCH 30-023/031. -0 on B0')601,dir fjector offg.iss radiation
monitors dropped to about 2O/, normal for abiiut 40 minutes
Caused bg mechanical vacuum pump offgas ismple valve being
i ncorrect 1 ij opened Valve nom uireil shut
JACOBSON, R D Northern States Power Cu BO/O7/01 Jp
—0007310309 Responcln t[> NRC 800503 Itr re violations noted in IE Insp
Rupt 30-263/BO-OH Curractivo actlonn labels reinforced u/
tope, redundant labels applied t< oitra set of labels provided
iii/instruct ions
GILBERTS, D E Northern States Power Co 00/05/23 lp
0007230336 Forwards IE Bulletin SO-lb, "Potential Htsapp 1 i cat i on of
RdtumQunt Inc Models 1151 b 1 1 5S Pressure Trnnsml tiers
H/Either A or D Output Cod&s " Written response required
IE Circular 00-16 also one! No written response required
KEPPLER.J 0 Region 3, Chicago, OPfico of the Director QQ/Qfc/27
lp
B0072101H2 Rosponils to IE Dulletin 30-10, "Contamination of
NonrmliDact ive 9ys & Resulting Potential for Urtmoni tored,
Uncontrolled Release of Radioactivity to Environ " Actions
re Items 1 t, 3 completed as of B0063S
OILDERTSiD C Northern Staten Pouor CD 00/0i/30 lp
0007240104 forwards IE Inap Fiept 30-263/00-13 on 000609-13 (. notice of
violation Notice of violation withheld (riff 10CFR2 770)
HIND, J A Region 3. Chicago, Bapefluards Drnnch BG/O7/02 3pp
— 0007H40107 IE Inap Hept 50-363/80-13 an 000607-13 No noncompl lance
noted Details withhold (ruf 10CFRS 790)
HIND. J A Region 3. Chicago, Bafeguardi; Branch CHRI9TQFFER.O M.
MADEDA.T J Region 3. Chicago, Office oC the Director BO/O7/01
0007310133 Responds to IE Dulletin BO-OS, "Biaminoti on of Containment
Liner Penetration Welds " Lists flued Pi cad penctratians tt
provides Info re ilcaign t( nondestructive Diaminntion of
penetrations
OILDERTS, D E Northnrn Btnto* Power Co 60/07/03 9pp
0007180B66 Nntiflos that time clock of1 Item H of If Dulletin BO-17,
"Failure of Control JlDda to Insert During Scram at DWR, "
ulll start at 12 01 AM nn HO0709 Test nhould be completed
within SO days nuiunsts notification of malfunction
Q Region 2, Atlanta, Office of the Director 80/07/O7
0007250963 Responds to 1C Ilulletin BO-11 Qechte) Poiuor Corp
contracted to identify & re-evaluate masonry ualtt Survegs
of inacceBHiblo areas will UD performed at earliest
opportunity ui/rnmilto provldsd In Pnllouiup rept
OILBERTB.D li Northern States Pouier Co BO/07/07 Il4pp
8007200037 (teaponds ta IE Dulletin BO-17 Surveillance tests performed
on £00704 found no detectable water in nys Daily ultraeoiilc
tests are being pnrformed lo inonltor Cor residue water Item
7 not apjil icab le
OILQEBTfi, D E Northern Btate» Ponor Co 80/07/09 2pp
B007290B11 Submits dddl response to IE Bulletin BO-17 Appropriate
revisions of operating procedures issued on 000711 No water
detected re Item 5 fleportino requirement TO Item 6s
accomplished Vurbal requirement per 6b made on B00703
01LBERTB, D E Northorn States Pouier Co BO/07/17 3pp
R Periodic operating reports t< related correspondence
8007180611 Forwards monthli) nperatlnfl rept for June 19BO
MAYER, L P Northern States Power Co BO/07/09 2pp
— 80071B0614 Monthly operating rept for June 19BO
MVRADO, A L Northern Stateii Pouier Co 00/07/03 3pP
DOCKET 50-564 DDH fHEMKAL CD
F Security, mud n ill , emergency '< File protection pldns
H0073B069'? DlBCiisses uproming reuieiu of physical security plan End
79O62S Itr w/Amend 1 to LlcenGe R-108 incorporated 7B1O2O
securltif plan Pending review uf iiTipnt p Ian, sutirtiitta 1 of
changes is nob necessary
MILLER, J R Standm-diiation !. Special Projocte Ui*anch BO/O7/O9
2pp
Q Inspection r-epnris. IE Bulletin'. !• correEponileiic e
BQ0717O617 Forwards IE Circui.ir £10 Ifl, "Hadioattive Contaminatioii of
Plant De-mineral 1 1 i-d Hater Eyc t< Resultant lntprnn.1
Cnntarainfltiort of Personnel " No uinttflii recponsc required
KEPPLCR. J G REgion 'i. rhicago. Office of UIL> Director B0/Oi./S1
lp
DOCKET 50-365 ftUAD-CITICS STAT1CN, UNIT 1!
F Security, mednal, emergeinij t^ Pirn piotectinn plans
H007010r}-)7 Foruiaids safeguorfit cimtingpncy plan amt'nd P!un uiithheld
(ref lOCFRe 790)
PEOPLES, D U Commonwealth Lilison Co BO/Oh/27 tp
0 Adjudicator!) correspondence
Q0073I0343 Forwards Commission H00127 memorandlini !i nrrier containing
decisions on UCS 70OS03 petition for reconsider.! 1 1 on of
780-413 memorandum S. order UCB 771104 petition auiifftit action
re fire protection for electrical cablen
EISENHUT.D 0 Division nt- l.icensino GO/06/25 H'Jpp
P Operating license stage doi uments !( coi respondenc a
B007830Q2B Summary of 000307 meeting w/Mdrfc 1 owners group in Detliesda,
MDjre rovlsions to NRC acceptanco criteria tt outstanding
itsups relative to Mark I i notflinment long term proyram
(HUMES, C T Plant SSBtems Qisnch UO/OH/Sl nipp
fl0073?O217 "Measuvflmcnt of Xe-Ul.C-H !, Tritium in ^ir (• 1-131 in
Vegetation & Milk Around Duail Cities NuLlear Pouier
Station*, "
KELLER, J H . AKERH, D U . DUCC. S W Idaho Natioiidl Fnginearing
Latioratory I'lN A-A07B NllREO/Cfi-l 193 BO/03/31 400pp
O00701007O ResponUs to FO1A rpqupst fnr S7 dncuments referenced in M
Tokar- ni*mo to ACRB concerning pel Ipt-cl.idd inn interaction
Forwards documents Hiiaing r Bcords are ituplitat Jve,
supBTBuded Dr available olseuiherc
FCLTON.J M Division of filiJet and RetOrdB 60/06/20 3pp
— B007010119 Forwarda dnitrlption of cuuses of 7S0522 off-gns release at
facility Release appears lo bo Launed by flu« peaking
SIEQEL.U Core Performance Brdntb 75/06/05 9pp
8007010)ll?0 Responds to 6BRT komerns rt control red drive sys lacking
niamic onalyBis Quail Citlei 1 !< 3 semmic dBsirfn oP control
rod drive su* lalculations performoil for facility while
under const end
dANECEK.R F Comrnonueal th Ldionn Cu BO/Ob/E4 rtpp
DOCKETED ITEMS
BOOVOIDI'M "nur1(j <-ltsPS 1 t, ,; CJC,*<T,IC n,,ta „„ control Rod Drive Sya
« Heaelor Lontvi-1-i, hit 7CVO7/1O
JO707O1 16 Submits revised responses to NRC 77OdOn It-is re
second level of untfervo I tage ptottction Fur A IV emergency
poiunr (.uses supplying saf fly- r t-la tc J luada
JftNECOt, R r (.iimm.Bnuio.il tn fdi^on Co HO/06/26 4pp
00700006-1 Responds to NltC BOOS 19 request For addl info contarning
adoq.uonj of utatum electric distribution r.ys vnltagns
JANECrK.R F rtimmomuenlth Ediaon Co BO/06/30 Ipp
0072B0170 Foruarcls "Ruac tor Containment Dldg Integrated Lc-a* Rate
Test." (< relateil opp describing Type ft tent No 1 1 Type A test
utll ni> nerforimt'tl during shutdown scheduled For 11E3
KALIVIANAK1E.N Corrnnunweolth Edison Co 3O/07/Q1 lp
-HQQ7Bttt>'l74 "Heot. tor Containment Bldg Integrated Leal Rate Test "
" Commonwealth Edison Co BO/QJ/IH 37pp
forwards revised schedule '• status info for Nark 1 program,
feoiiuflte. sparer repine omont •!. general uiorfc planned For
Ouail CitiRs 1 nnta-ge Ps-ntendlng on priority basin ui/mods
providing l.ii gost safety increase margins
Hl:ED.C Carnnonucr-iltli Edison Co 80/07/03 IHpp
10710DJfla rtpplnntitm For amend to App A, Tech Specs of Licenses
DfFl-2'/ Jr rjPFt-30, imp lament Ing first protection mods
•MNECEK.R F Camdionuiffal tji Edison Cn 8D/07/03 2pp
B007IOOI4/ I'ropo&od changes to Ti*th Boers 3 13/4 [3-1 through
3 IH/4 LH-*?i Iropluitionting Fire protection nods
* Commonmniilth Eiliaon Cn SO/07/03 IBpp
1Q7310313 neapond* to MrtC rcqucr.t For addl info rp turbine disks
Apji licnblB turbino mlrsillc nnalusit ua« preapntcd In Amnnd
3 to fliiJid Citie* CP .application AnflluEio applies to Dresden
due to similarity at general arrangement
JANECGK-I? P fomnonwcnltli Cilimon Co 30X07/13 l[i
HO0702O589 Foriuarda IE Carrular 80-13, "Loss of Reactor Coolant Pump
Cooling (. Natural ClrtuJdtinn Coalriouin " No urittBii response
requi red
KEPPLCR.JO Region 3, Chicago. Office of the Director BO/O6/20
ip
BOQ7110131 Forwards notice op violation & notice of proposed imposition
oF civil Jie-naltlen arising Prom IE BOO131 )nsp
STELLO, V DPFtce of Inspection & En For cement, Office of the
Director EO/Ofc/2O 2pp
— a00711O136 Notice qf violation from Insp on 800131 Noncomp I lance noted
surface radiation of transporting vehicle eiceeded max
alloupable millii-Bin per hnur
• Office uf IiiBpettion tf Enforcement, Office of the Director
HO/O1/3I Ipp
— 0007110145 Notice of imposition nf civil penalties based on item of
noncompl iajic e re eicesBive surFacp raifiation on transport
vehic IB
» Office of Inspectlnn l< Enforcement, Office oF the Director
30/06 /SO I p
B007I4Q117 Notice of proposed imposition of civil penalties In amount
of *4,000 Fur item oP noncompl lance re radiation levels on
waste shipments cicpBding regulatory limits
» OFPiie oP Inipecttnn ti EnPovcemcnl. Office of the Director
80/06/20 Ip
BOO7I7043O Foruiards IE Circular- UO-11. "Radioactive Contamination of
Plant Demlnoral iicd Water By o., & Resultant Internal
Contamination of Personnel " No written response required
KEPPLEn.JO Region 3. Chicago. Office- of the Director 60/06/24
BO0723O309 Foriuarrfa IE DullBtin HO-1A, "Potential Misapplication of
Rnsemount 1 nc MoJoJ s 1151 d 11S2 Pressure Transmitters
W/Eitber A or D Output Cades " Written response required
IE Circular 0Q~l(j also end No inritten response required
KEPPLER, J ft Hogion 3. Chicago. Office op the Director fiO/Oi/S7
lp
Inspet t ion repurts. IE Dulletins d corrBBUDlnl ence
07140S'l3 Forunrds 1C UiMletin BO-13. "rracking in Core Spray
Sjijir-gers " Written respontE renuireil
KCPPLEft.J G rtogion 3. Chitagu, Office of toe Director BO/05/12
IP
070JKHJAD Forw.lrds 1C InFa Notice BQ-3S- "Bt-eali douns In Contamination
Control Proi)r,imn " No written response rieq.iiirD-d
KEPPLER, J 0 Ueginn a, Chicago, Office of the Director 00/03/50
>P
0701000ft rorunrda IE Info Notice BO-i'3, "LOBB of Suction to Emergency.
r»Bitiir«ter J'um|!t. " Mo urltton rniponne required
KEPPLEi), J 0
IP
Reoinn 3. Chicngo, Office of tho Biroctor
B007300&74 Foriuards Waste Packaging Insp fiept 1S00004A/BO-07 on Q00131
Notice of violation foruordcd under separate cover
KEPPLER, J 0 Region 3, Chicago, Office of tha Director 00/06/27
3pp
— "007300535 Waste Packaging Insp Rept 1 S00004o/BO-07 an B00131
None ompl 1 anco note-d radiation levels on surface of trailer
in excess oF rBpuJatarij limits
BOOK, H E Renion 3. San Francisco. Fuel Facility !< Materials
Qaf«ti| Drench CA1N-C t flc-gic-n t, Dallas, Office of the
Director BO/OH/27 7pp
B0071B0309 Notifies that time dock of Item 2 of IE Bulletin BO-17,
'Tailurff of Control Mods to Insert During Bcram at BHK. "
uill start at 12 Ol AH an BOO7OQ Test should be completed
uithln 30 days Heo.uoHts notification of* malfunction
KEPPLFU.JO Rogion 3. Chicoflu., nffiee of the Director, SO/07/07
O70B0736 ForiuartH revised r-BSponac to rt Bulletin 79-010, "Environ
OUH! 1 f Icat Ion uf Class IE Equipment " IilDntiPlet nreas uhorf
ttf for t Is rottfcinulno in identification of equipment
quHl i f icat tons W/o encl
JANEICEK, R f rommpniOFialth Ttlison Cn BO/0&/O? lp
07L>20l3t> forwards IE Info Nottcfl 80-2A. "Evaluation of Contractor
tA Programs " No ujntton rcaponte required
KEPPLen, J 0 (legion 3, Chicago, Qftitv at tho> Dlroctur BO/Ofi/lO
07140'JOV ForwarOt, 1C uulletln BO-14. "Dugrnd.itHin of BWfl Scram
Dlscliaran Vol Cniicibi ] tby " Urjttf-n reaponBr rpquireil
KEPPLUfi. J 0 flpgion 3, Chicago. OFFico oP the Director BO/06/13
>710000+ Foru.irils rcifionBo to IE Bulletin 0O-07. "HfjarnrnDtor Actuator
DffficientiHS. " No sjjffrtu -rplati'd sun or camponent at
Jrosdnn i! fc 3 uaes AH-70 or NH-90 ttrlns hydranotor
ic tun tore
'EOPLCB. D L Coiranonuienl th till son Co 00/06/16 3ff
J/030037 rorunrAs IE Ilulletln 00-1S, "Posiible Lnsi of EmErgency
Jotifjcatlon liys ft-N9) W/LQBB up Offtlte fouer " Written
rtspDii-te reituived
tEPPLCR.JQ R«Ston 3, Cbitago, Of Men of the Director BO/06/19
IP
ao0723O6fll Reipond* to IE Bulletin BO-IO, "Contamination of
NonradiooctiVB- BIJS A Resulting Potential For Unmonitared.
Uncontrolled HeloaBe af Radioactivity to Environ " Any
afftfctod BIJS will tie restricted If contamination found,
PEOPLES.DL Cammonuealth Edison Co 80/07/07 3pp
SO 072 9 0650 Foruardt response to IE Dullotln BO-ll, "Hasonru Mall
Design " Doqueated inve ttlgntlon not perfurtned at Dresden,
Unit I due to ei tended outage Requirements will be mat prior
to startup W/o encl
PEOPLES, D 1 fioranioniiieal td Edison Co BO/O7/07 Spp
Q00723063B horuiarda raspon&c to 1C bulletin BO-OS, "examination of
Containment Liner P'onc trail on Welds " Dresden Unit 1 dosigns
will uo revlDtued !i Feasibility of performing radiographic
ainminatlons uiill lie aEBeased bpforo unit returned to nvc
PEOPLES, I) U Cnmrnonueal th Edison Co BO/D7/07 7pp
S00716O630 Responds to IE Dulletin OO-17 re results of tests required
btf Item 1 Ha significant amount of water in scram discharge
volt Wnt & drain linni also verified free of obstruction*
bij p«rPormlrtg dynamic air tea- 1
JANECEH,n F CommcnuiBalth Edison Co 00/07/10 2pp
BOO72HOQ71 Forwards aiidl rBsponec to IE Bvlletin BO-17. Items S.3,4i5.ia
Jt 6b Nu-ki procedure lisa buan writ ton to cover actions
He-con tary uhun runtrn-1 rods fail to fully insert during
scram
PEOPLES, D L Commonuiial tli Ellison CD BO/07/11 Spp
DOCKETED ITEMS
80073IO397 Responds to NRC Bnndp.'O notice of proposed impnaitinn of
civil penalties bij f oruiard ing payment
PEOPLES. I) L CemmonuJDalth Ediocn Co BO/07/14 Ip
0007310333 Forwards response to violation noted in IE map vn SO013]
Corrective actions procedure no in requires uniter-tr si 1 i>r
checfc of rarfuiaute shipments t, prt survey of article'; at
shipment origin lo assure p.ickagp'. ai e uitliin dnec limits
JANECEK.R F Cummnnuiea 1 th Edison Co SO/07/15 3pp
B007300flB3 Respond! to IE Bulletin /r/-14, "Seismic Analysis for As-
BUilt Safety-Related Piping Sjs. " bij foiuimding "P^DcebiirB
for Review fe Resolution of As-Built Deviation**" !. "Prcc edurp
for Application of Blume Turves Criteria "
JAMECEK.R F Cammonuiealth Edison Lo SO/O7/16 Ip
-BQ0730049B "Engineering Cr i tep ia
As-Built Deviations* " Revision
SNVDER.T K EDS Nucloar. Inr
pu !< RuHcilulion of
llpp
-B0073Q05QB "En(| ineering Cnteiia Procedure PUT Application of D 1 airie
Curves Crl teria "
SNYDER.T K EDS Nuclear. Inc. BO/OJ/O7 COfip
R Periodic operating reports !< related c urruspond enc-n
8007150619 Foruaids monthly operating repte fur June IfBa
KALIVIANAKI5! N < ommoniiieal th Edison Co BO/07/01 Ip
— 8007130625 Monthly operating reptt for- Juno 1980
HAFERA.T Commonwealth Edison CD BO/07/01 4pp
^ .1 1 It g i n g poi'iuilitij
tc -'•UT i- LfiLA fonteiula Ih
threat to publ.r
FflLK.KH Witc
0007390070
i tu
ribe HI o|jp
petition to inli'ivrne !. c. oi>t en t mi
Injury ill f.jct te',1 not met Valid
Hearing a-, of nghl must bt
1JI FnviTnit Optarte iiipp 1 umpll I
liili>ri>*-t not rtflci toil
t ontpn 1 1 un<i not '-ubrni tted
( rr 1 1 f ic<9 tf ff <3"i i-nc 1
D
ulin!)
Cnf ori e/ncn t H
HO/ft/XH1!
Wl Eu
. 1 1.1 BOO7JS ^upp 1 Pfnen tal
c uiltiven.ir Failed tn
rntuiitinn .lOilrt-s 5 infl
D007300-JQI rtesfniti
Filing tle.inng ,s nut uari
'.tato intprt^.t fi frill td to
IBSUCS of NRC 7911JO nrJn
.O Uietonsin EleirriL pnwcr Co CHAMHDH', 0
Putte ;, TrouJli ridij u IJO/C17/30 L Ip u
--BOO73tlO'3VO Hotinii to iJenvj HI l"n/irnn Uun.idc ! nc W\?\i requps
hearing re NHL 7I?linO nrdi-i IntDr^ffnor nut entitled to
hoarinr) ,*t> matter of right D i sr re 1 1 midry tie^r ing
unmarran tcil CiTti Fn ate o ( '>vc *. ni'tite of .ip \ie-n ;inc t eric 1
MUflRAV, J P , CVB.K . LlgnCHHAH, ,1 Ijulemakjng «' CnFor c omen t
Divi'iiOTi SO/OP/I 1 l*p|>
General c arrqspondi>nte
Urgoi NFK to conOmt full |H otjc iff fntillti) rip ST. it i nil ilurtng
SOO73O prvhparlng rorifBiDiin> ^aFi-tij MSMiruncct fthould lie
given tn ((immunity Local new p.jppi 5 iltTitii-nt in iletflillng
concerns
SPKINO.C A , SPUING, W Affiliration Unknown KOX07/14 Ip
B Rtportable occiirrenceB, LEfts ti related c ovreapoiid enc e
0007080162 Forwards LER BO-OI5/03L-O
KALIVIANAKIS, N Commonweal th Edir.pn Co BO/06/E6 Ip
B007a90A31 lloquBhts that facility nut lit allowed to < unlisiue of em t ( tig
iu/Fiaulty I. liefectivo- tileam j}c<nUTatoi tuber. Dffp[tivi> ft
tie terluratBit lube', shuuid Uc i ep liic<'4l IIULJ Sttnal-inti ar>i>s»iitb
potential for another Trtl ,7 tin idL-nt
KHACHT.UH Affiliation Unknown FIO/D'/yr,' 1 p
— BO070B0172 LER SO-O15/O3L-0 on BQOfaOl, leati found in HPCI steam oiip
lino Caused by thermal cyrliiig during no rm.il operabion^
ueakening Email section of fillpt to eld UPC) syo taken out nP
svciuield ground out t< melded By 6 returned to svc
HOP AC 2, J Commonwealth Edison Co SO/06/Hi Ip
B007310a/J OppoBi't, ut-il reiiuoit fur omen (I to mod urdm on grai
Bcr ioimm-'cs of tube tfpgrudal i iin prohlom clemnndi complpto
rcvleu of 1Q effective full PHUICT dnij inE|i results dy NRT
boforp nprr.itlnn purmitlpd to rcBiinif
FALK, K N Wisroniln's Fnvironmon t^il DpLinli; lid. O'jSBh IP
8007240113 Forwards LER 80-014/03L-0
KALIVIANAK15, N Commonweal th Edison Cn 80/0//J5
P Ojieroting
— 8007940111 LER BO-014/03L-O on 000623, dur i ng surveillance check on HPCI
emergency oil pump. found oil leak on it i sc hargc line Caused
by cracked threads on plpp nipple Pipe nipple cut t<
rethreaded
» Coramoniueal th Edison Co 00/07/32 2pp
6007230397 LER 79-021 has boon cancelled
COLLINS, M Coimnonuiealth Edison To BO/07/22
V Operator Examinations
B00702031<J Responds to 800912 Itr requesting extension until Full
for completion <it annual requalificat ion eiam due to tiddt
work load Exam date may be delayed until F3O0730
CQf-LlN3,P F Operator Licensing Uranth 60/06/10 Ip
8007E3Q091? nei|uo!,tii aulmittal op pni|ni!>«d lorn ^(ici {.lianget pm^ldin
for redundancy in ilBLfsij licnt rrmiivtil c itpnl, 1 1 i ty in ii 1 1 modus
of operation Mode) Tech 8[>»i3 iuh i r Ii mould provide ii< c »p talil e
resolution uncl for guldariLo
EISENHUT.D 0 Division vf LlconMiig QCVOi/1 1 fi?pp.
*BOO71705fifi Foriiiflrdb uvdluat ion of timtrol rori pui-df ttumblu ucai in
Cacilitli-o ilcslpncd bij UH>sliii[|t<auBi Dtiied an i pj i t>«i. i nfiue
Is resolved
. R A Oporoting Root Lin E Uranrh '; BO/0//CI -Ipp
0007230001 fJoquo'.ts bub mi ti a I cf itp |> 1 ii O 1 1 an fur amen:! t n l
cnriBlating of Tticli Spec Lhari^f^ *( litcniD c ontl 1 1. 1 fjii'j PWR
HoJol Tech SpOL-i !< Nodal J it CD to c i>nd 1 1 1 oil* for TMI-P
Lofsonn Laarnnd diltgonj A iti'md vni I fin nuidsmp
E1BENHUT, 0 O Division of I inm«-ni|j (JO/O7/OP 6f)p p
DOCKET 90-366 POINT BEACH NUCLEAR PLANT, UNIT 1
F Security* medicdl, emergency f< firu protection plnne
BOO7300440 Formarde emergency plani revised draft, Jul 17
FAY.C M Wiaconain Electric Power Co 8O/O7/35 Ip
0 Adjudicatnry curTespnnduncc
BOO7310243 Foriuards fommiSEion B00537 raemorari-dum !c order containing
deeiaipna on DCS 700502 petition for recona ideca t ion of
7B0413 memorandum t< order DCS 77110"! petition sought action
re fire protection for electriial cables
EISEHHUT, D 8 Divimtin of Llcunaing 00/06/S^
H0071OO241 Noticeu of apponraticD in litensp mud •proceeding CcrtlflcstE
of Bvc enrl
CYR.K D , HQEFLING, H R Rulemaknig t. Cnfoi cement DiviEion
BO/07/09 3pp
3007150'6'til Itecniur. It r.< Lnnni on of ci.mmimt peiiDtt on NUBEG-0:)// until
aOOgiSiduc to uther uurk ePfoi-ts R«i|,uosts no Ii f i r sis oi> ouli]
IP citenaion fiiuud unflccup trtliJu
FAY.C W Wi*cun*in electric POWPT CP HO/07/03 5 f
BOQ/lSOtfl2 SubmltE rommentB on NUREO-('ft34 Tuo til) JIT Lionah 1* Item* 1S-
mlnuto time -frame proposed bo tompipt* puhlic tin t if ic.vtinn
(t propriety at mm shift staffing r 00.1.111 empn ta proiiO'ocd In
Table B-l
FAV.C W Wisconsin Clectric POUMT I'll HO/07/On ftp p
0007SJOO34 Confums BcJicdnlnj Cor BIJOVOO meelinij n1 Bite to dl«c<i«6
racent intT-eaaii of poi'soniu'l prrnrfi nt f aci 1 1 t-ii>!>
HEPPLCB..I O Region a, Chicagii, CJfficn of Ihn ftnoctor UO/0//O3
0007I50AP3 AiivSsei, that plant will If taker, off-line un B0072S for
tcheilnled oi'tauc In riiniluc b hu<l I cif> t«l lc tu'.t<- r< iiir>i'rvicc
insp nur •'/O-Uaa offecllva full POUIT requircmunt
FAY.C W WiscunBin Elertm POIUPF to b(J/C>7Ai/ Ip
DOCKETED ITEMS
0007210408 FnrujaTilb reviled U'rh Spec I b D <1 For stHdm *< OQUBT
conversion, -ijs 1< Four 72-fi te-t rep(5 For amilianj fPBd
pun? in response In NfiC 80051ft rcquc-st for rfHi.ll info re
auilliarij Feedualpr eys.
F/iY.C U Wisconsin flectiif Pouor (.u 60/07/00 4pp
3007030030 Poniards IE Bulletin EiO-15, "Possible Loss of Emergencg
Notification Sjs (ENS) U/LOSB uf Dff^itt" Power " Written
re a p on EC requ i red
KEPPLEF1. J G Region 'J, (,11110901 Qffire of Hit- Dircctoj DO/Ofj/1
lp
— B00731O438 Fteviterf Terh Spet ! r> -T A far stea^i t, poupr conversion si,
< Wisconsin Electru Pouer <- o HO/07/Oft 3pp
— BD0721O412 "SE^ent«-TuO Hour Test r,f Turb ine-flri /en AunHaru Feed
* Uisccnsin FlF-ctne Pcnuer 'a HNTP II 21 RO 7WJ2/3Q lOpp
— BQ0721O46Q "Si-.enty-luo Hour teit nf TurL ino-Dr ivpn Auiiliarij Fffed
• Wisionsin bl-fttrit POUIPI i"n UM1P 11 i!l FJO 79/12/07 iOpp
B007O30949 FDrusrdB IE Circular BO-iS, "Loss of Reactor Coolant Pump
Cooling tr Natural Circulation Cooldcimn " No written response
requi red
LEn. J G (fegmn 3, Chicago, Office of the Diretlor HO/06/2O
(JOO7J7OS34 Forufirils IE Circuldr BO-1-1, "Rsdloartlve Ciinlamliifltion at
Plant Deminerflli jed Water byi '- Resultant Internal
Contaminat lun of Personnel " ND written rpaponse required
KEPPLER, J 3 Rt-gHin. 3. C!iica0n, Office of the Director BG/O&/24
IP
--8007210465 ' S&vpn tij -Tiut) Hour Tebt of bl Pttr i c-al ly-I)ri ven «umliarg Feed
Pumji •
• Wiitonsui ElpftilC Pompr ko WHTP n a.*1 RO 77Xia/2t IQpp
— a007SH)4i,9 "Seventg-Tuio Hour lest off El PC tr if al ly-Di i ven Aunliara
Feed Pumps '
» Wisconsin Eli'ctrxc P«usr fo lirlTP II 32 FTO 79^13/23 lOpp
GOO-7S'103aO Advi;i<!> 'if NRC renrg^ni la tion on RQU4]>I) mh i c h resulted i
number of chdnges in ofc 1 1 tle-i. p«ii tione !i atsignim-nts of
p»l~5onnel (llso iiibmits info f-C" ClTTrt
NO'/AK, T J1 fl-Siistant Pirettor for Qperotlng Hsai-tors BO/07/tlS
B007a504BO DIECUSBBS potsritial melding bef i c I enr i es in tanks fabricated
tiij Graver Tant * MFg CD flequeats dctBrminat-tan wheth-cr
ufldments in sat e by-related Gnavnr liints inset deEign speco
t> Fabrication reiuirement?
MOSELEVpfJ C Division of Rpactoi OpprationS Iliapettlnna SO/07/OH
Q InspBction report!,, IE Bulletins
c nrrcspondEiui
B007030037 Forwards IE Info Notice BO-S2, "Breril.il Buns In Contarninat i on
Control Prografiis " Wo urlllen rosponto required
KGPP1ER.J C Rngion 3, ChiCdgo. Office of the Director BO/05/28
IP
B-00733034& ForiuarilB IE Dulletln BO-16, "Potential Misapplication Df
NoBemount Jiic Models 1151 t. 1152 Pressure Transmi tters
H/Eitlier A or D Output Codeo " Written response refluirod
IE Circulfli HO-l/j also end No written response required
KEPPUT8, J 6 Region 3, Chicago, Office of the Director HO/Qb/27
0007310304 Forwards IE rnep Rpp>tS 50-26^/20-11 !< 30-301/BO-ll On
BOD£ili"17 Mo noticompl tance noted
FIDUCLH.O Renlon 3, Chicago, Reactor Construction t. EnginD*rinp
Support Dranch BO/Od/3O Epp
— B00731O316 IE Insp ReptB 50-2fc&/BO-l 1 t. 5Q-3O1 /BO-1 1 on HOQ616-I7 No
noncDmpliance nobtn Major ureas inapectod licenser actions
re IE Bulletin 79-14
YIN. 1 T . DHICKUEV-R1 H Heglon 3, Chicago. Office of tha Dlroctor
DrtNIELSDN.D H Region 3, Chicago, Buactor ConKtrurtion t<
Engineering Support Qranrh BO/Oi/30 9pp
B007170536 Responds to IE Bulletin (10-09, "Eiajntnat ton of Cdti Uinmon t
Line-r Penetration UeUi " All containment melds Either have
leak chas.e channel or penetration has closure cap or
eipauaion beltaujs uiolde-d outside containment
FAY, C H Wisconsin Electrir Pnuor Co BO/07/O3 3pp
fl007aad071 gubmits jeplij to IE Bulletin ao-10 re contamination oP
nonrddiuat tiv-p %ij6 (i potential fm releaGcs Completion of
bulletin ravicu not dnticipated until BOO831
FflY.C W UiEtonajn Elsctric Power Co 80/07/07 3pp
300721O-109 Foruard? !6 Circular KO-13. "Orid Strnp Damage in
West tnglioust Fuel As-semblies " Nn uritfcen response required
KEPPLER.J 0 Rsgion 3. Chirago. Office of the njrpctar 00/01/20
60070100^0 ForHJards IE1 Info Notice BU-2J, "Los- oF Sifttirn to EnnergBncy
Feediuater Pumps. " Wo uiritten rofiponsc required
KEPHLER.J Q ffeginn 3, ChiiagC. Office of thu Director HO/05/29
lp
BQQ7Q1003Q Hnspondi to IE Bulletin fJO-Ofc, "t.rig inperod Safety Feature
1ESF1 Reset Controls " Control of iolennid valve uill be
flio-dlFied tucti that total rot irtulstioli of control roam air
uill continue ufter resat of containment Isolation
FAY.C H Wisconsin Electiic Power To aO/06/Ofa 2»p
BOO70IOOfi2 Responds to IE DnlleLin SO-05. "Vficuum Condition Resulting
in Qaisiase to CJmmiLal Vol tuntrol Sys ifTCSl Ho-1 ilup Tanks "
\ Mod will he imolumcntad to prevent operation nf holdup tank
\ rec irculjit i on pump ui/u poBtbivi1 pm^^urfl in tank
FflY,C W Wiatunsin Electrn Ptiypr Co HO/Oft/Ofi 9pp
B007160717 Rfl'poniis to IE Bulletin RO-Ob Review condurte-il nf schematic
drauiings lo iletirmine actiuna resulting from engineered
safety feature iictuation sign.tl f, utiethor pquipmt-tit Tcttirrod
to nonemErgenty mode upon rcniival of aLtufltmn signal
FAY,C U Wisconsin aiectric Power fn CC/Ofi/OS 3pp
S00701004J UflUater, S00307 re^pofite to IE Bulletin 79-1-1, "Seismic
Analgs-is For As-Built Safi'tij-Rp 1 ated piping Sys " Piping
analijiis c cm p IP ted for 6'' nf U& previouslij tahulateil
irawinff s.at of 90O&33 Status of roviuui eni 1
FAV.C H MisroiiBtn Flertric Poupr Til QO/Oft/09 Spp
B007220236 Fcruards 1C Infn MutiK- UO-^b. "Evaluation of Contractor
OA Prngrniris " No written response rp^ulreil
KEPPLER, J G lieginn 3. fhicast,, QfficH of the t),Te< tor SO/Ot/lt)
IP
8007160195 Fciuarris IE Info MotitB HO-57. "Deji'ajnt Ion of Reactor
Coolant Pump Studr " NQ sjitrifst .iclioti or rt'spncisp
required
itEPPUFR, J 3 Rfgion J, ChUaun. OfJirP of thn Diri-itor BO/Oi/ll
Q00724034B Fleaponis to IE Bulletin BO-I5 re powur supplg to o
notiftcalion tijs telephones Charger supplied by telephone
camp any id conn acted t-o safeguards Dua 21312 Phones verifiod
opEratinnal u/loas of at to cftarjer
FftV.C H Wisconsin EUctrit Pnunr Cn BO/07/OB ifp
6 0073004 5 1 Foruiards drawings far revised pump ?i valve inservlco In'BP
testing program. I-HP 1 at ino 77Q520 program Program t< drauiings
available m Cnntral Files only
FAV.C U Wisconsin Electric Power Co 80/O7/35 lp
Periodic opuratinfl reports d rolated corrDspondcncfl
0007150^10 Forwards rnonthlg operating repls For June 1900
FAY, C M Wisconsin Electric Poiuer Co BO/07/10 lp
— 8O0715G61B Monthly operating repts for June WBO
FAY.C M Wisconsin Electric Pouer Co BO/D7/08 ipp
9 Beportable occurrcnres> LFRs It i-elateil correspondence
B00701O109 Foruacils LER BO-O07/O1T--O
FAY.C H Wiscnnsin ElectTic Puiuer Cu aO/0(,/S3 ip
~ BQ0701O430 LER flO-007/OIT-O on 0DO(bll,blue instrument bus 1VOS was
de-onergii sdi resul t ing in de-ent>rgi jatlon of 3 containment
pressure channels Caused bu, personnel error Pouer restured !•
instrumenta tion returneiJ to normal
FAY.C W Wisconsin EHettric Power Co BO/06/35 Spp
B007HO333 Foruarils UER 00"OOa/03L-O
FAVj C W Wi5(OPisin Gle'Ctric Power Co
— B007H034G LER HO~OOB-'O9L-0 on 80060ft, during normal operati on. testing
revealed that relay 1-217/ftnaX <n train B would nut drop out
to initiate under voS tagc trip function Cause nut determined
Relay rsplfttsa !i teited satisfactorily
FAV,C W yisconsin Electric Power Co 80/07/03 2pp
DOCKETED ITEMS
67
Operator Eiaminatior
B007240085 Responds to SOOtO'l request for info re requirement tliat
operator li senior operator luense .ipplicaiits spend 3 months
on-shift In training Varianre to requ I reme-nt cannot be
pormi tied
NOVAK, T N ABB IB taut Direttoi for Operating Reactors BO/O7/O3
3pp
DOCKET 50-267 TORT SI VfiAJN NUCLEAR ^ENERAT I NC STATION
F Security, medical, emorgeniy !i fire protfction plans
B0071HO196 Forwards NRC 8QO425 Itr to all poioer reactor licensees,
response to 800^29 1 tr ro emergency response facilities at
reactor sites Sites ui/approval tu use closed-circuit
television link id/technical support ctr listed
CRUTCHFIELI), D H Operating Reactors Branch 3 BO/07/07 2pp
BOO71B0150 Requests util participation in study re people-related
problems in nuclear safeguards Portion of study involves
collection of da til on licensee security forces t, practices
NRC to contact security mgt to schedule visit
EISENHUT, D 0 Division of UicenHing SO/O7/09 Ip
0 Adjudicatory correspondence
B007310343 Forwards Commission B00327 memorandum t. nrder containing
decisions on UCS 700503 petition For reconsideration of
780413 memorandum l< order UCS 77HO4 petition sought action
re fire protection for electrical cables
EISENHUT, D S Division of Licensing BO/06/25 B9pp
J Insurance & indemnity information
0007290629 Forwards Endorsement 32 to ANI Policy NT- 192 I< Endorsement
13 ID MAEUJ Policy Mr-61?
OASCHLER, J A Public Service CD of Colorado BO/07/23 3pp
P Operating licon&R stage documents & corrGapondonce
B007020251 Requests invoice far fee foi shipping route approval PSC of
CO 790B22 application
MILLER. W 0 license Tee Management Branch BO/06/06 Ip
B0070*?0333 Submits info re thorium pur i Fication facility Proposes thai
processing take place in separate bldg adjacent to Facility
site [i outlines purification process Request!. response to
Itr by BOOD01
SWART, F E Public Service Co of Colorado 00/07/03 4pp
B0072BQ493 Forwards GA Co B006HO memo re inside/Dirt cuidfltlnn of
tjraphiti? tn relation to ronclor Phunumenon mill not occur
at facility Oildation uias not observed in profiles generated
in lab under representative reactor conditions
BNART.F E Public Service Co of Colorado BO/07/IB 3pp
0 Inspection repnrtsi 1C Bulletins !i correspondence
B007020309 Responds to IE Bulletin 77-Q3A, "Long i tudinol Weld Defects
in ABME 6A-3l2,Type 304 Stoinloss Btoel Pipe " Piping fipets
da not allow use of ODajned stainless etenl piping in any
sys
BNART.F E Public BorvHe Co of Colorado 80/04/23 Ip
BQ07020273 Foruiards IE Info Notice BO-B3, "Breflkdoums In Contamination
Control Programs " No written rosponBO required
BEYFRITiK V Region 4. Dallas, Office of thp uirottor flO/05/aa
0007010014 Forwards IE Info Notice QO-33, "Loss of Suction to Emerg-eniy
Feeduater Pumps " No written response required
9EYFRIT.K V Region 4, Halloa, Office nf the Director BO/05/39
IP
B0071900B3 Tnruards 1C Insp Rept 3O-2A7/BO-10 on B00501-31 fc notice of
violati on
MADBEN.O L Region 4, Dallas. Jleactor Construction fc Enfllneerlns
Support Branch BO/06/06 Spp
HO0733O126 For
QA Programt
SEYFRIT.H v
Ip
rds 1L" Infn tlotiir BV- JL, "Evalualioii of Contractor
Ju wr i It PI i ri • fpousp i . qu i re it
JcoAni, 1, Dalla (Iffnt nf U'P Dirittnr 80/Ofi/ 10
60071002S3 Furmards Ih Intp R..pt bO-E;
noncompliandL' no ted
KELLV, J A I" Region J. Dall.. Ofd
DOO-i^-JB No
--B007K10325 IF Insp Rept 'lO-i't
noted HUJUT .ire.is inspected
irradiated fuel in transit
(reF 10CFH2 750)
CrtUDWCLL.n rt , HELt.V.J A F
Director BO/Ofi/16 Ip
, ft('-J I on ia>Oe,S7-,^
phy'.iifll jirtt t ei 1 1 ti
i'tiiiJ^ u>i thhi>ld
Clffico of the
SOO7010331 Ack riTEipt of B00*-0<"' Hi infinnung NSl nf steps taken to
correct violation-, noteU in Ih Insp He|,t &0-P67/BO-OS
KADBEN.G L Region 4, Dallas. Offsio iif the Director 90/O6/2D
IP
— B007010.2'J<J Responds to NHL H0f-r>(»(j 1 ti i i> violations, nole<! in IE lusp
Rept 50~Sh7/(Ki Oil Correttivt .iclions maint oF proper diescl
generatiir dm; tunk level uint rp-eniphdsl / ed to all operators
LEE.Q R Public, foervici. t.o of Coloiado BO/Ofc/02 2pp
flOO7240O5.1 Foriudrris IE Lircul.ir H'l-15, "l-(]5i of Heat for Coolant Pump
Cooling !i Nfltuidl Tirtulation lonliluiitn " No untten response
required
BEYFRIT.K V Rf-gion 1, D^ll-,-., ()P4ne of ttn- Direitnr SO/06/20
6007330615 Fpruards i ear tor nuiilijjiij cucilmy uiati-r t-js inservict- inssp
ts testini) rHc]iiiT empnts an.ily.i'- liiiluaps draft RnviBion 1
to Tech Spec survei llani i> i equi r I'mtn ts for rpactoi auxiliary
cooling uator 6ys, d ttnchmr nt ti- i IT t CK-4d-0004
FULLEH-F V. Publii Kor«ict. (c, uf f ulurailo BO/07/16 22pp
— B0072Bl)65r! "Inservice Insp '( fi-slmo Progrdm Surve 1 1 liince RequiTemonts
llevkoui for Ru^ctor Aunlidiij Cooling Water 5ys "
• Public Servici- Cn of Cnlur.iOn nt-16-01104 BO/Oi/a^ 45pp
R Periodic operating T uports
l«tpU ton esnondente
B007010311 Foruiards -rionthly upoiatinr] i opt fur May 19fll)
WAnEMflQURQ, D Puhlii Service (o of Colorado BO/06/33 2pf)
— B007010346 Monthly npo.rttinn Hipt 77 tor May 1980
GAHl-W W Public. Scrviri- ( t. of foloind.i UO/06/')2
0007080^06 Forujards monthly optrrtting mpt Fnr June l'J80
UAREMDOUJIO, D Public Service Co ft lolc.rndo fltt/07/01 Ip
— Q00708040? Monthly operating iupl fin June I9UO
OAHM.J H Publli -Service Tn of Cnluiado 50/O7/01 -Jpp
S Reportalilc oLriirronces. LLHs t, related
BOO424O2B1 PND-1 V-UO-U1 on L10031 1 , dppnronl failUTO occurred on
circulating uifltut ccioMng tuuiei 1)1 sri ibution header Reactor
fe turbine manunlly tripped urulo nt 36V pouicr Depair time
unbrtouin
WESTERMftN, T F , MflUSEN. r L fleginn A, Dalln^. r.rfic.e of the
Director 90/On/ll Ip
BOQ70BQ2S4 [ oruards LUR BO-OHEl/OJL -0
VJAREMBtJURO. P F'uMir Service 1,0 of Culoradn Bfl/06/19 5pp
— B0070B03(h2 l-ER flO-OSfl/031- 0 on POO'J.'O, dui ing circulating uater sus
chlnrina lion, tot.il tlilorine ic>>idii<il PIC ended li^it Caused
by tlilorinB riaffliind detrvu'iD folloiiitng steady tncreflsc
Chlor ina tinn '. lilDliidouin n-Suieit
QAHM, J W Public. Service Cr, of lulorado 80/0(1/19 I f
— B0071300BB Notice of violation Fi om insp on B005Q1-31
» Reoion 4, Dallas. Offtrp of the Director BO/06/Oi
9007080269 roriuarils LFR &0-OfWfUL -0
Oj D Puhlif Sprvirc ( r> of Colnvado BO/06/10 Bnp
DOCKETED ITEMS
BOO 708O«T' 5 LEFI BO-liab/OCIL-l) on Uo<i3J3, during 8011533-30, tnta 1
coolant a.Urtnt-, uere grf.iter tflan 1O ppm u/aveTage core
nutlet terap ,jliDVfl 1 , 2OO F m
moisture incrposi- f, c
J W Public Ser
bon
icp T
T, UEEdsion* Caused bi|
inte *< dio.itfi? combination
f (.olcradcj 30/06/1? Ip
ruruiards LEFt
Punl i,
ice Co OF Colorado BO/06/19 6pp
DOCKET 50-263 MILUEST FUEL RFCOVEHY PLANT
P Operating licence stage documents !i correspondence
BOO7OaO-H7 Forwards LC House 740113 1 tr to OE re OL schedule, per 800132
t Picon
CLARK. T A Aflvarn-ed Fuel J, Spent Fuel Licensing Branch BO/O4/23
Ip
IFfi H-0-OEA/O3L-t> en B(JO534, dur ing tes tino, hel i urn circulator
seat malfunction pressure Differential switch units tripped
outsiae FpEli Gfvi limits Caused by dirt accumulation in
electrical BUI ti bes Trip points reddjusted
OflHM, J a Public Service Co oF Colorado BO/O6/19 Ip
— 6007020423 Discusses schedule for preoperati onal testing ti licensing
OL could bff issued 740315 One month IB needed to reviem
preoperat I onol test infu
ROUSE. L C Atumic Ener-gt/ Commission. Directorate of Licansing
74/01/15 Ip
9701O4V& Forwards L&R BO-O.-'O/OaJ*-!
JAHCHDUURH. D Puhlir Service Co of Colorado
007O1OSO6 I Ell 8Cj-f>3n/Q3X-l on BOO-) IB, during tes ti r>g, two of 12 helium
circulator ipal malfunction pressure differential switch
unit?, tripped outside Teto <3prr limits Cauied by dirt
accumulation in t-lct tf lea 1 switch Suiitches readjusted
OAKM, J W Pohlu Service Co of Coloi-aUn SCI/Oft/ 33 Ip
DOCKET 50-3i9 OCCNEE NUCLEAR STATION, UNIT 1
F Security, medical, emergeTicii t. fire protection plans
BQ070J02O3 Fopuarrta security plan re in-transit requirements for BNM of
low strategic Ei gnl f i eance Plan withheld (ref 10CFR3 790)
PADKEfl.W D Duke Pouer Co BO/06/34 Ip
)70QOaiO Fnruardf, LEU BO-OJ7/O3L-0
PuMlc Service to of Colorado
BO/O7/01
5pp
OO70B0315 LEIt BO-oa?XO3L-0 on, 800603 to 1 I. tht BB 5*parfltir instances
uf reactor op&rntion took place u/ inoperab] e Clus-s 1 sJiock
•auppr Bisnrs rnuscd by rotated rcservniT. IDUI oil level duo to
cracked Fdttin'a a ptaton rod seal ] eaV
(MHN, J U Publir Sorvicp Co of Colorado 60/07/01 Ip
rds LEW BO-O39/t)ji,-.n
Public Service Co of Colorado
80X07/01
007OFtO301 I-CR BO-03^/03L-O on 8006O3. at apppoi AOX, pouiec. rffactor bldg
pres^uie cnuld not ha maintained subatraosp hen c Caused bij
Tr-oien air line to reactor lildg louvar pn&umatic actuatar
due ta liquid nitrogen prunnuty
OAIIM, J U Public Service Co oF {'olorndo 80/07/O1 Ip
7100173 Forwards LER QO-OM/O3L-0
AHEMBOl/RO. D Public Service Co of Coloradt
80/O7/09 6pp
107IO0176 LCIJ !JO-030/,D3L-O on S00(,04. uh i te performing leakage test,
Jlsc Dvpreii Hi at l pop 3 steam generator penetration leakage
picEp<Ji?J a 1 1 uuiab 1 B limit Cause unknown Temporary rolief From
allobiable limit receivod from WR-C
OrtIIM.,1 hi Publlt Bervlre Co of Colorado 30/O7/03 Ip
'\SOMU LCR 77-OA3 liflE trer>n camelled
JLUINS.M Puhlii "inrvirp CP of Colorado
BO 07230 070 Requests participation in stuilij of paop 1 e-rolated problems
in nuclear safeguards Study involves collection of data on
licensee securitiji farces ti practices NF)C luishes to
intervieui securitij rngt personnel at facilities
ETSENHUT.D Q Division op Licensing BO/07/11 3pp
O Ad jud i c atopy correspondence
QOD714046I Statement of Board of Commissioners' position in apposition
ta radya&te transportation through Gaston County, NC Urges
transportation via Interstate? 77 ti B5 Encourages eipending
energy ti money for recij-cling U/correspondence
* Oaston County, NC SO/O1/S8 Alpp
— B00711C"173 Foriuardi addl comments to Oaston County Board of
Commissioners' position opposing spent nuclear fuel shipment
through county ti tmn proposed altprnate routes Author doea
not oppose shipment If adequate safeguards are provided
CASTON. H n fiaston Countyi.NC 80/04/25 2pp
— B007I404SB Forwards position of Gaston County Doard of CommisEionersi
NC, opposing spent nut 1 esi Fuel shipment through county &
tkio proposed altprnate routes W/o end
RHYME, C A Gaston County, NC BO/04/15 Ip
H007310243 Fnriuarda Commissiion BOOS37 memorandum & order containing
decisions on UCS 7B0502 petition for reconsideration of
7BD413 memorandum & order UCB 771104 petition sought action
re fire protection far electritfll cables
EI6ENHUT, D Q Divisian of Licensing 00/06/25 B9pp
230343 Foriiiards LErt BO-O3^/03L-0
. D Public Servtre Co of Colorado
5pp
IQ/H3O539 LtFI BO-Oaa/03L-O on 3(10617, ui/p lant operating at approi 6.BH
thermal power t< t13n\4* I'V-HJ.243 uat nut control] Ing at
appropriate sptpfiiit Caused by defective Hasonellan PV
Dove on ajipllpd to se-al ring «a*lcot stopped valve leakage
U Publtr Horvlce Co oF Colorado aO/O7/15 Ip
'K3034H Forujurdi LEU (JO-O34/U1L-t>
, l> I'utilic Service tm of Colorado
Spp
07230SS-1 I EH BO-034/OaL-I) on HO Oil 9. 1 1410 helium tirculatur seal
malfunction {iressiire dipfercntidl EW! ttlies tripped outside
limit a Ceuspil bij dirt accumulation in electrical suitches
HuillchpE readjusted GutLingi. to be chucked monthly
OrtHM, J W Public SfTviee Co of Colorado 80/07/15 Ip
P Operating license utagc documents t, correspondence
HOO 634033 7 Responds to technical assistance request for proposed Tech
Sp»c changes POP QtcU operating plants Forwards requirements
for- addl info
ISftAEL.S L TM1-3 Bulletins tr Orders 79/OB/29 I3pp
8OO734O20B Forwards B!,W licensees' renponaes to 7909O7 request For
revleui of acliedulo For installing safety-grade anticipatory
reactor trip for loss of feediuater t, turbine trip Review
should be complelud by 791115
CflPJtA.R /< 7MI-3 Bulletina !. PrtJerB 79/10/34 Ip
6OO7140397 RofETi to 300701 1 tr i-equestinfl Info re insp of fuel
assembly bold-down springs Kevieuiei! concern ti documented
rosulbs in S0040& ) tr foruiardin^ RO 30-269/80-13 !< safety
evaluation No further info required
PARKER, H 0 DuliB Pouer Co BO/06/OB Ip
Forurnrd^ LEW BO-
ICMDDURO.D Public Bqrvire Co of Colorado
FKV07/1B 5pp
C-FH 130-OS'l/O'it, (J on SOOfiPO. w/re»e tor operfltllig at power,
roaclor dnwpaint o-iceedeil ] unite dxiicd bu. tnolE>ture Ingress
occurrino dur Inu 1A circulator butt er-mi d-liuf f ?r li|i»Bt *<
circul a tor trip
DrtHM, J U Puhlft Service CD of Colorado BO/07/1B Ip
90O7230099 Requests suUmittal of proposed Tech Spec changes providing
for r-edundaney in decay heat removal capability in all modes
of operation Model Tech Specs which mould provide acceptable
resolution and Fur guidance
EISENHUT.D & Division oF Licensing 80/06/11 63pp
BOOTIfiOISV Toruiords. Amends B3j 3T & 80 to Licenses DPR-39, DPR-47 t,
DPft-5Si roipocfcJVB-ly. saf etn evaluation t< notiro oF issuance &
aval 1st 1 1 * ty
F1E1D, R W DparatinB Rcsttors Branch 4 BQ/Oi/12 3pp
DOCKETED ITEMS
69
-8007160434 Amends 83, B3 J( 80 to Licenses UPR-aa. DP R-47 t. DPH-5b,
respectively, revising Tech Spec* to suppnrl operation of
Unit 2 at full rated power during Cycle 5
REID.R W Operating Reactors "ranch 4 BO/O6/12 23pp
-BOQ7160443 Safety evaluation supporting Amondi S3. 63 i. BO to Lie
DPR-3B, DPR-47 t. DPR-55. respcctivel y
* Office of Nuclear Reactor Regulation. Dirottor BO/Oi/lS
lOpp
BOO72307OB PTOVIUI^ infn IP nt'uj OK title; j.ositions. '< a?
personnel resulting from BOOO.'d i rai giini reilion of ilfc c
Nuclear Reactor Ff egti Id 1 1 on
NUVflK.T N Assistant Uiroitor { nr Uperatlmj F<e..ctur&
Spp
SO07150Ii7'j Forwards "fttMiunc EH.irtup Physics Tf-t Pr oqrdm. Jul 19BO "
Rept supersede', in entirety rL-pt* s.uf>nii itrrl f)(IOAO4 >i 11
PARKER, W D Pulp Power Co Hu/07/11 Ip
— B007160433 Notice of issuance !< availability uf Amends B3. B3 J, BO to
Licenses DPn-30. DPR-47 t. DPR-51, respecti well;
REIDiR W Operating Reactors Branch 4 BO/Q6/12 2pp
-6007130583 "Generic Startup Ft
supersedes in etitiretij pinvi
bij «OO/iC)4-ll 1 trs
* Duke -Power Co HO'/)?/ M
jst F'lotjrflm, Jill I9SO
jbmitteti lepts forunr
Rept
8O07O2O314 Notifies of NRT conclusion that util did not provide
sufficient info to justify 7BO60B proposed increiise in
THC)I Spec steam genoratoi tube leak rate limit Evaluation
enc 1
NOVAK. T Assistant Director for Operating Reactors BO/Gt/l* 3pp
B007010360 Advises that installation of addl spent fuel coding train
uiill be completed in Apr 1<7B1 No more than 342 assemblies
uill be stored in pool until completion nf installation or
14/0 NRC approval
PARKER, W 0 Duke Power Co BO/06/54 Ip
B007070035 Forwards safety evaluation re pustulated fuel handling
accident inside containment
REID.R H Operating Reactors Drench 4 60/06/24 Spp
—B007070039 Safety evaluation re postulated fuel handling accident
inside containment
* Operating Renctora Branch 4 BO/06/34 Ip
8007030579 SummariieB actions undertaken by ottl re inadequate core
cooling NRC review of previously submitted operator
guidelines should be completed prior tn util committing to
install neu) instrumentation
PARKER. H 0 DuVe Poyor Co 00/06/37 Sff
0007090223 Advises that response to NUREQ-Q667 IE in final review &
will be submitted by BOO723
PARKEfi.M O Duke Potiler Co BO/O7/01 Ip
B007S20477 Forum ds "Unit l.
P/iRKE«,W 0 Duiip !>ciuer C
lu 6'itiirtiip Testing
HO/0//1 1 J|>
— n00732O4»3 "Unit l.CijrJe (• c.t.irt»p Testing
' D-ufcp Pouier fn DO/O7 Jl llp[,
flOO7S80417 Foriuuiri-i pmpo">cd le.i&uin to Terh Ipfts !e amend tn QL
Proposal tlarifiei. insp reqin remtiiL^ afrei pi iniflnj to
secondary leak tpetificd in tr-rh ^IH'C 4 17 4 Requests that
(JRC roviBW (4 approve propor,.!! in timely manner
PARKER, W Q Puke Power <~o Hfl/07/15 -3pp
80072a(l't38 Proposfd Tech Spei revisinn Page 4 1 7-3.
requi rcme-nt^ after primnnj tn '.I'cnnrlary leak
# Duke Poiuer Cu flD/07/H, ;:PP
i f y ing insp
B007310591 Forwards NtlRfcG-1 JW3 ft NllRtO 1169 detailing dcvolopment of
checklist Cur nvaJoatliig mjint tt" t fi ml ibr p roc c?t)uri>5
used in nut leer planti Afk util i uopprdtion in eturiy H/o
encl s
LEWIS. R C Region S, Atlanta, lU'rfi-tor Up-f-i Qt] onb riuclecir Support
Branch DO/O7/lb Ip
3007260314 roruarils rer.ponse tn ri'tummpnilflt i PUS in
"Transient Rnspc-nse nf BI.W De&igni'd Uerff lore " Daspd nn
revieiu.nD action is net BBhiinj fur Tnijniitij of
recommenilatiDTi?.
PARKEf?, H Q TJuKe Poiuer Co HO/07/c'J 7Opp
B007090271 Forwards safety evaluation t environ appraisal For propoieil
Tech Spec revision re reracking of spent fuel pooliuhich
uill be submitted later Class I tt IV amend feet and
PARKEfl.W 0 Duke Pouier Co BO/07/O1 3(ip
BO0731O379 Applicnliun to amend lice
Bpeci to rufloct ritstimp tioiis u^ed
spent fuel pool oiporrsiori
PARKEH.W 0 Duko Pouier Co HO/07
PS UPI1-3B (t Dr'll-47, chanj] ing Teth
util E100701 1 tr re
3pp
— B007090274 "Units 1 J< 3 Spent Fuel Pool Poison Roi ack Licensing
Submi ttal "
» Duke Pouev Co KO/07/31 Slpp
BO07H10004 Forwards queations re Fuel assembly holddoun spring inep5
safety significance of operating ui/broken springs in cor if
Requests response within 60 days
NOVAK. T M Assistant Director for Operating Renclora BO/07/01
4pp
— B0073103«l Prop on" if Teclt Spnci, 'J !i 1J a.'J S I & J< 5 4 3 1 to permit
eipansion of spent fuel -pool strnnge rapacity bij ror-ackin!]
spor>t Fuel pool iu/poiion rut IE,
ractia
» Duko Poiuer Cn Btt/07/31) App
— B0073103B2 ReviBCd pjtges to "Units ! *< P Spent Fuel Ponl Poison Reratk
Licencing Submittal "
* Duke Power Co flO/O^/fn 5pp
B00729000) Requests aubmittal oF application for amend to license
consisting nf Tech Spec changes t< license conditions PVR
Model Tech Specs t< Mortal license conditions for TMI-2
LliBoni Learned Category A items encl foi guidance
EIBENHUT, D Q Division of Licensing BO/07/OS 49pp
BO07180104 Notifies that 800317 request for route approval In cover
ipent Fuel shipments to BSW Lynchburg Hosearch Ctr is subj
to UcBnse fee Review of request WOE completed on B00414
MILLER, H 0 License Fee Management Dranch BO/07/03 Lp
BO0733005S Responds to i>ti 1 (300317 request for route approval coveri
shipments of spent fuel to DSiW Lynchburg nesearch Ctr
Review of licensee route approval requests subj to license
fee schedule in IOCFFU7Q
MILLER, W 0 License Fee Managempnt uranch BO/O7/O3 Ip
BO07I1O294 Foruards appllcatinn to ami-nd Terli Specs to incorporate
ttst frectuoncy reqitirBments of 10CFR30. App J
PARKER, M 0 DtiKe Power Cn BO/07/07 Spp
— B007110331 Application to amend Tetli Epec 4413!) incorporating
test frequency requirements of- 10(TR30,App J Eiisting Tech
Spec unacqeptable fnr Bitended cycle lengths for uluch
current (< Future cycles are/uill he licensed
« Duke Pouor Co BO/07/07 2pp
•0- Inspection i-cporls. IE Dullelins t< cm I erponiFenct
B007340122 Fmuardi EE, Ir.fo llulite fl(l-?0. "1 liss of Upcay Heat Removal
Capability dt Davi ^-Busse i/nit 1 Wlnle \n Hefuelmu Mono "
No rnspoiiBo required
O'OEILI-V.J P RBtt'Di 2. rtlJ.mld, Dffite nf trte Hirector 00/O5/OH
B007100144 F-crujaiili IE hi&p Rppts, 50-y(.9/B(J-14. "iO-?/0/80-09 !.
SO-SByjao-fil on WOO 4 PH -O SO 1 No nontomjilianrd noted
MURPHVjC E Rpfliiin Si Atlanta. Reactor Cunttrur 1 1 on t. Engineering
Support Branch HO/OI/y? E!pp
— S0071001!J1 IE Insp KeptE SO-?iif/BO-M. ',0- ,'70/UCl-OV '. SO-3G7/BO -09 an
BOOflsa-OBOl Nu nnncompt 1 nnc e nntcd M/ijor aroas inspeitod
tirv protection/prffvantiiin
CONLOM. T E Region 3, fttlaiiffl. Be.irtfir Cuniti uction !, Engineering
Support Uranrli HiLLFR. H H Rug ion ,2. Atlanta. OFfice of thp
Director BO/OU/P3 lOpp
00O70SOHO'! Foruards IE Tnf-n Notice HO-.V "Ui Dnkdciniii' In Curttami nat i on
Control Programs " Hn uiritlun retponse roqini-ed
0'REm.Y. J P Renion 2. ftMai.tJ. UFfitP i.f the Riipctoi BO/O1/E8
IP
5007210^19 ^oru!QrDI. IE Cirenlnr fiO 1^. :l.rJd Strip Danape In
Uestlnghnusih I-nel rtstptnbl i PI. " Nn uiritlon roipoiite required
O'REILLViJ P Roulon 2- Atlanta. Offire of till- Dneilor BO/05/2B
IP
70
DOCKETED ITEMS
8007010213 fotuants tE In(-n Uotup (Ki-ZX. l-t>** at Suctinn to Emergency
Feeduutei f'irrnp= ' No written iisji-n-ii' T( quired
D'REILL* .' f legion 3, Atlanta. Df f n e nf the Uirpctar BO/09-/.29
BOO7£2004S roTiuaili IE Into Notice fl^-^ft, ' F^ci luat ion of Contractor
Oft Prugr-.iins ' Hu luntten rE-pun^p required
U'REILLV.,! P Hts""1 2, rttJdnffl. OfFiie of tlie Director HO/06/1O
FonuairtB update of n.Fo to 791 (),?&. 1 106, I .J07 !. 8 lot 34 It's in
response tn IE [lullotin 77-11, I tens J '. 3
PAHHEH, H D DukP I'ouer Co BO/Oft/ 1 i flpn
300716D2'i5 Fnrujdrils IF Info Notice 8D-J7, "DflgradatniTi iiF (ieactor
Coolant Pump Gtiiat " No spprifir urtion ni response
required
O'HEILLV.J P necjioi' 2, M-lantn Office of the Director BO/Ofl!
lp
5007030761 Fnruiarrts. ]E Bulletin BO-IS. 'Possible l-osi of Em*rgoncu
Notification 5ij«- IEN<J) WyLOi.5 of Cffslte Power " Uritten
response required
D'REILLV.J P Herjion 2, Atlanta DfUce of the Director BO/06/1B
10070204 "19 Fniuards IE Circular HC-11}, "Loss of Reactor Coolant Pump
Cooling ti Noturfll iirrulotion Cooldouin '• No written response
requ I red
O'REILLWJ P Region 2. Atlanta., Office of the Director 8O/06/2Q
007130015 rtcfc rnn-ipt of It Insp Repta ;i[)-»ft9/BO~18. 5D-270/SO-1 3 (.
30-207/80-12 fin 800513-1-5 Nu [iropr i i-tary info
PARKER, W 0 UuVi Power Cn R(?/a6/S3 lp
80072501*6 roriudids response to Items 1 : c'a *< 3 0'' IE OulloCin QO-11.
"HaBEnry Hall Opsign " Lists all unisonr-D walls which are in
prinrimity to or lijvc attachments from iaf oty-rolated piping
of fjtiui pment
PflrcKER.W a Dgkt? Cower Co HO/07/07 Elpp
S RepD-rtable ni c urr ences. LF.Ks !• related coi respondent
DOO7O703I9 1-orwardE t-ER BO-O1B/O3L-0
.U D Dule Power Co BO/Oft/30 3pp
— SOO7O70323 LCR BO-OlS/oaL-O on BOQMll.high pressure EVt mater pump 11
declared inoperable due to motor cooler tube lead* Caused by
erosion *i corranion resulting fvoro contitant floiu of lake
mater Leaking tubec soldered & coaler pressurlied
PHILFOTT.F T Duke Power Co BO/06/30 lp
Qa0711O3iO Forwards UEfi SO-O30/01T-0
PARKHR.tl 0 Dulie Poiuer Co HO/07/OT
~P00711O3;i2 LER BO-O20/OIT-0 on SQ0617.at 74X poyer, hac hup 135-Volt d«
pouter to instrumentation & control power sys reinoved From
avc to Investigate ground alarm Isolating transfer diodes
not reconnected uithin Tech Sprc Hfl-h limit
PH1LPDTT, F T l>ule Pduier Co BO/07/03 tp
8007^10417 Forward!. LER SO-021/03L-O
PAHHEHi W 0 Duke Power Co 00/07/11
4pp
~BOO?21Ofl21 LER QO-Q2I/03L- 0 on Q00613.U high pressure injection makeup
liner found etc c&si vejij hot Apparently caused by 1HP-15S
diet* valve not Sieating properlg. al lowing uiater to floui into
ID1 cold leg
PHILPPTT, F T Duke Power Cn 90/07/11 lp
-Q007150019 FnriLjaiOs IE Insp fiepts 50-2A9/BO- IB. SO-270/BO-13 t
30-SQ7fBO-lJ on HOCWI.I-IS No nnnc nmpl isnce noted
MURPHY, C E Region 3, fttlantai Reactor Con-a li ucti on fc Enginearing
Support Branch BO/O3/L'9 L'pp
OOO7150O3I IE Inap nepts 30-26?/BO-ia, &0-a70/BO-l3 Jf 50-237/80-12 on
HOOS131-19 No nonf otnpl lanre noted Major areas inspected
atruitural cnncretc- For ttandbij sli utdntim facility
HARR1B.J R Kogicir. 3. Atlanta. Office of the Director
CdNLUNi T E Region E> Atlanta. FipflctOT Construction !( Engineering
Support Branrfc BO/05/2'9 3pi>
)0717O10-1 ForiLi.nda ]b Circular BO-I1). "Fladjoattivr foTitaminatiCTi of
Plant Dominorali led Water Sus I, fte5ulti>nt Internal
Contaminati nn uf Pei-aonntl " No urittpn rcBpnnse rfqtiired
D'HEILLY.J P Jiegicii 3: rtHeittta- Offlrc of the Director 00/06/01
IP
107160533 ResnomdE ta IE Dulletim 79-O3A, "Longi tuoina 1 Ueld Defects
In /iSME art-3IL'.Type 3dfl StsirilHBft Steel Pipe " Nc Type 300
piping in uLe fur prpusure piping Future use oF piping uill
be TBvleLJDil
PrtTOEIT. W 0 DuJje Power Co 8D/OA/P4 lp
IO7220175 Advisee that >hanqer in£[i required tiy IE Bulletin 79-13 uae
not atfdresBffd in rnaptniiB t-u bull-stin Hangers visuallij
inspected a* pnrt uf r«'>pc>rise to 1C Bulletin! 79-O2 Si
79-14
FARMER. M Cl rule Power Cn Bn/06/27 lp
07330J3& f-ortuards IE Bulletin 90-14, "Potential Misapplication of
ROHemount Inc MudslSi 1151 i 1 1 S3 Pressure Transmitters
H/either rt or t» Output Codes " Written a-esponse required
IE Circular flQ-16 d 1 lu curl No written reiponse reiuii-ed
I'REILtY.J P Region 3, Atlanta, Office o.f ths Director BO/Oib/27
60073104'i9 FonuardE UER BO-OI7/03L-0
PARKER. W 0 Duke Power Co 00/07/11 3PP
—H007a 10470 LER 30-017/031 -O on B005P7,at 73)4 foil pouer.CDAST pump uas
removed frcm s-vc for preventive m^int consti tutlni) operation
In dojraderf (fiode Procedure uias In violation of Teen 9peca
Tech Specs or procedure changes unrter evaluation
PHILPOTT, F T nuke Pouer Co 90/07/11 lp
B007H30239 Part 21 rept re cracked steam generator manway Etude
Bati sFac tury operating eiperlenco forms constitute
reasonable basis fOT continued op era t ion uihile
inve stigations jiroc-eed
TAYLOR, J K Baiicocfc t< Uflcox Co BO/07/ Ji 5pp
BOO72205A3 RQ on BOQ7O9. h igh pH excursion in oil collection basin
discharge uas rliscovered Caused by mater discharged from
upper sump uf safe -shutdown facility const Const personnel
advised nf discharge limits
PARKER, W 0 Duke Power Co BO/07/ li 2pp
S00722O424
LEU BO-O19/03L-O
Pouer Co BO/07/17 lp
-B007220127 LER aO-O19/03U-O on B0061H. concentrated boric acid storaoe
bank pump found Inoperable actotding ta Tech Spec
requirement Canoed by Failed vacuum compensator uithin valve
pump Valve diaphragm ti motor replaced
PHJLPQTT.F r duke Punier Co BO/07/17 Spp
DuCHET 50-270 OCdNEt NUCLEAH STATION. UNIT S
F SeoiTity. medical, emergency d Plrc protection plans
072BO06H Confirms recaij^t of NBC H £)*>£. 1 7 Itr transmitting IE Insp Ropt
•sO-269/HO-aS Concurs m/NRC decision thdt info < oiitainod in
•apt is SL'ciiri I ij-i elated 'i hhiiuld nnt PD jilacud in PDH
3flltKER.IJ a Duke Power Co 80/QcV3O lp
5732034S Furujarda leipons* to IK Bullstin 80-OB Approi 53
lenetrat ioriB concernecl Wpld deceits clHssified ,-ij inclusion
liifl repaired fu> urordlno ttatign inet-ta all requirements of
f)uHf Poiuer Co
4pp
foriuariis BOO/Ofl Revibimi R to response tt" IE Bulletin
'9-011)p "Envirnn flual i Pleat i on of Class IE Equipment "
epUcen previous subralttnl *• BOO5t9 rpvtr.ion PntU'ely
ncludes rorrr-ct luriG u f minor oTrori
H1CB.AC Dukp Pnujer Co S(J/OV/(I7 36pp
BOQ7O1O2QH FnruiarifB security plan re in-transit T-Rnuirements For SNM of
loui strateflic tign i f=l cance Plan withheld (ref 1QCFR.2 790)
PAffKER. W a Duke Pouer Co B0/0&/r4 lp
H007S3007O Henuests participation in study of people-related problems
in nuclear safeguards 'Study involves collection of data on
li-cansce security forces d practices NRG ulshes to
interview securitg n>9t personnel at facilities
EIBENHUT. D B Division of Licensing BO/O7/11 3pp
•0 Adjudic^tory (.arrespondence
B00714O4A1 Statement Of Board of Commissioners' position in Opposition
to raduatite transportation through Gaaton County, NC Urges
transportation via JnterEtates 77 !c 05 Encourages eupending
eneroij *< money for recycling W/torreBpnndence
* Oaston Countij.MC BO/04/UB 61pp
DOCKETED ITEMS
71
—800714017:1 Forward* add) comments to Qaston County Cnurd of
Commi ssioner**' position opposing spent nuc I e*ir fuel ^h ipmc
through county !. tuio proposed alternate routes Author does
QASTQN, H E Gaston Count LJ fir QO/O4/29 2pp
8007310004 Ft
safety ftigTii
Heq.uest& rt
NOVAK. T M
4pp
>>pm|j 1 y lioldd
— 8007140488 Forwards position of Guston County Doard nf Commissioners,
NC, opposing spent nucleai fuel shipment through county *<
tuio proposed alternate routes W/o enc 1
RHYME, C A Oaston County, NC BO/04/15 Ip
BQO73IO243 Forwards Commission BOO5P7 memnr.inttum f. order containing
decisions on Urs 7(30502 pttitiun for reconsideration nf
7B0413 memorandum (. order UCB 7VII01 petition sought action
re fire protection foi electrical cables
E1BENHUT.D G Division of Licensing BO/Oft/PT 89pp
B007a9D()(H
nl tti! 1 Of «[i
P Operating licone
stage document!! t< correspondenc
B00734030Q Forwards H&W licensees' responses to 790907 request for
review of schedule Fur installing saf eti|-grade sntl c i p.itory
reactor trip fur lass of feedtuater F. turbine trip HPVIBU
should be completed by 791115
CflPRA.R ft TMI-2 Bulletins, t, Orders 79/10/31 Ip
BO07140397 Refers to B00701 Itr requesting infu re map uf fuel
assembly hold-daunt springs Reviewed concern ti -documented
results in aOOiOi ttr foruarding RD 30-369/80-11 f. safety
evaluation No Further info required
PARKER, H 0 Duke Power Co BO/O6/OH Ip
Q007S30099 Requests auhmittal of proposed Tech Spec changes providing
for redundancy In decay heat rentov.il capability In all modes
of operation Model Tech Specs uihich would provide acceptable
resolution encl for guidance
EIBENHUT. P « Division of licensing 00/Oi/l 1 62np
8007160429 Fnriuards Amends B3.B3 t, BO to Licenses DPR-3H. DPR-47 t.
DPR-35. rcspec tivp lij, safety evaluation ti notice of Issuance ?<
availability
REID. Ft U Operating Rene torn Dranch 4 BQ/Qh/lZ 2pp
—0007160434 Amonds B3. B3 tc DO to Licenses OPH-3B, DPI1-47 !. DI'R-35,
respecti VE| y, revi aing Tech BpocB to nupport operation of
Unit S at full rated power during Cycle 3-
REID.R M Operating Reactors Dranch 4 BO/O6/12 23pp
— B007I60443 Safety uvaluation supporting Amends 81i 83 B. 80 to Llcencos
DPR-3B. DPR-47 li DPR-53. respectively
« Office of Nuclear Reactor Rpgulatian, Dlrectnr BO/O4/I2
lOpp
— 0007! 604 S3 Notice of issuance !< dvai lab I 1 1 tij of Amends 83.03 !> BO to
Licenses DPR-3B, DPR-47 I. DPR- 'jR, rcspec lively
REID.R H Dpernting Roactorn Dranch 4 BO/O6/12 2pp
B0070103ciO Advises that installation of addl spent fuel coding train
will be coinpletttd in Apr 19B1 No more tdan 342 flsGemblien
uiill be stored In pool until completion of installation or
u/o NSC approval
PARKER. M Q Duke Pouier Co 80/06/34 Ip
B00707003S foruardE safety evaluation re pnbtulated fuel hanilllng
accident inoido containmenl
REID.R W Operating Hearlnru nr.inch 4 80/06/St Spp
Model lecii Spr
Le^sans LejrriE
E1SENHUT, D t
BOO717Ofc47 Fi
far Cycle '
trans i ents
SPEIS. T P
i s. ! Model Lien
nl L,.ttgonj rt J ti
Divi 51 on ut- 1. 1 1
1 fat g UJ dsn< t
] BO/O7/O2 c,9pp
t. p
—800/1706^;, FoTMnrd. nraitnr' 'j,,tetij Branih ev.d u.i 1 1 t.n n f facilitij fool
load Fnr Cijclf r) operation I. a^oiiatad Fecri Spec-. Utll
has not submiltpd iicceptohlp startup test prDgioifid-i of
BOOi,3O ll/o pncl
rHECK.P S Assntant Diri-rlor foi Plant B^ttfins RO/Ofi/30 Ip
8007I IO2?4 Ft
test frequ-p
Q
uord-. .ipplicat ion 1 11 ami'nd Terh Sp i
y r iiqu irementL, of ICCfFCiO Afift J
DuVe Poujor Co jm/07'07 2pp
tn incnrporati
— Q0071103aj Application tn nnv\i« Tpch Sppc 4 4 1 2 b incorporating
test (Veiiueni ij requirements of H)rKiM>.App J Existing Tech
Bpoc. unacc(jpt.i.bli' for eitcnilcil cyi le lengtJiii for uhich
current Si Futmp cycloa uit/iuill tif liLEjnisefl
* Duke Pniuer Co BO/O7/O? Ppp
B00723070B Priivi.lps info re ucu »tr tit let, posit ions l< insignmentB
perscinnel insulting f i om SnCI1?fl i rorgrini rntinn of Clfc of
Nuclear Rcactci Heyiiliiti on
NDVrtH. T M As*i5tnnt UiiPLtor fur Operating Fteactnrs BO/07/10
3pp
B007150575 Forwards "GeneriL Stdrtup Pliysics. Ti'st Pi n
Kept RupDrsoder. in cntirptij repl'. submitted H00604
PAF1KCW.W 0 Dule 1'ouior Cl- i3H/07/Il Ip
— -80-0/180503 "GEiiPi-ii Startup fhijsir', lest Hrogrnm. Jul 1VBO " Ropt
tuperspclec in pntirftij prtvinur.lg bubimitted rcpta foruardod
hij HGOAO-J-L1 Itra
•• Dulto PUIUDT Co BO/O^/ai 14pp
BOO72a0437 Foruiards proposedl revision Ui T&ch Hppcs t. amend to OL
PropOBfll il.trlfles insp requirements alter primary to
sec onilanj Itsk tpt'C i f i fd in Telh ^pcr 41/4 Requests that
NRC rovipui !i ajipruve propoitil in timeiy manner
PAfWEH.W U Duke Power La l!O/0//lb 3pp
siun Psgi! <l 1 /-.I, c larl fy ing
0007310B51 rormards NUHfcO-UeiB t. NUHfeG-l')C>9 rtctailint) development of
chpckllBt for evaluating miiint ti"it f. t.ilibr jirocedurpt
used in nuclBai plants rtc k k'ti] cuupprstinn In study U/o
cncl s
LETMtS, R C llcyioii P, Atl,)iit,i Ri-<ictnr DppT'.itiond Nucledr Support
Brnnclt tia/07/15 In
PiopntniJ Tech ti|iti rp
ui roments uftin (irimdry tu
Difke Pnuipr Co
— 8007070039 Bafetij evaluation re pnilul.itod fuel handling occlde-nt
inside containmcn t
* Operating Reactors Branch 4 BO/Ofa/24 Ip
0007aiOfl39 Applnfitmn for ami-rrii tn 01 m.ising lech Spec 3 3 I c
alloying continued oper.ittnn i, T Unit 2 nl full i.iti-d power,
uihile miiint ctiotlnunb on HHJ |i uoip until R00710
[) Ouko Punier L<i OtJ/07/16 Iff
8007020575 Smnmsriion actions undqi'taken by utl 1 re inadequfltp core
cooling NRC review of previously submitted operator
guidelinen ahuuld lie (.omplrtoi) prior til uti 1 committing to
instal 1 neui Instrumentatian
PARKER, H n Dukr Pouior Co 80/IM./S7 Spf
8007000SS3 Ailvises that response to NUnEfi-0667 is in Final revleu t.
uill be submitted by HOC 7 23
PARKER, W 0 Duke Poiuer CD BO/07/01 Ip
— QOOTSlflflHA "rupiiaeii luvisicjn to todi fa|i i
Dpvratian o( Unit- «> cf Full ratPd IIOUJ
continuet on HP1 pump ur>til H0071H
« Duke Pomei tf HO/07/1A Ip
"I T 1 t fallowing conll tiueil
uih 1 1 1 maint
DOO72?0'&A1 Advjt-.i', of error *ti itiponiis fc,r Bite tipprific (luestion
Parts B !i C. suhmi tteil In 01)11 jj I fj Itr.in re = ponF-i> to qiiPstioTii
re lou tuibinc ilisr crai king ( on et t re BPOHSUI. tnc 1
0 Dule F'oninr Cn 01/07/17 ?pp
B007090271 Toruiards safctg «valuation !i environ appraisal for
Tech Spec revision re rerecklng of spent fir el poo) , uih i ch
uiill be lubnittetl later Cl>ir,E I !< IV amnnd feet end
PARKER, W 0 Duke Pouor CD BO/07/O1 3pp
— B00709027A "Units 1 t. 2 Spent F-uel Pool Poison
Bubmi ttal "
» Duke Pniuer Co BO/07/31 31pp
BOO72BOI19 Cnnfirras H00716 toltiiii In tem|,o.rai I )i| uinei.d Toch Spec
3 3 1 ttaXbl bu ,.dding HPT Pump P,per B007U. ruquu^t Amend
path age tncludnig safety evflln.it inn 'i luxtiL-c will lie
f or marked shor t 1 y
HOVAK.T M AbilttSTit DM PI "Ui fur Dperating Ru,,ctQri 90/07/17
72
DOCKETED ITEMS
BQQ72BO42/ ForuBids proposed lee.li SUM J 1 ^ ri>vi&.
temp limits Clrics 1 ' II! limns* amenii fee vncl
PARH.ER.U O but* Pomer Lu HOiO'/FH -3pp
— 8007280410) Proposed Tech Spi'C .1 1 P.
» DuiP Pnuer Co BO/07/32 7pp
tamp 1 I ml t <"
60072305'J'l FotuarilE response to retomraenilB tiono MI IHJIiEO-Ofi67,
"TransiETit ReiH""" of QM-J Designed He.ictnrs " Uased nil
revieu.no action is iiPLESsiirii foi n.ijontij of
ret ommendati ons
PARKER. W O Lultu Poujpr (o BO/07/JJ VOpp
B007310379 Application to rfniend LICITISBB CPH-38 ), DPFl-47, chano i rig Tech
Specs to roflD(l assumption-. used in ulil f!007Dl I tr re
spent fuel poo! eipanbion
PARKER. WO Duke Power Co HO/07/Pb 3nn
— BOO73103E!! Proposptl Tech
3 B 13 .1. 3 5 1 5 F( 5 4 a 1 to permit
storage -c .i|>.ic i tij by rt!rock ing
sppnl fuel pool u/poiion ranks
racks
* Duke POUET Co eO/O?/^1; /-pp
— BQO731Q392 Revised pnges to "Units 1 l< 3 Spent Fuol Pool Poison Rprack
licensing Submittal "
» Duie Power to BO/07/PO Spp
Q Inspection reports, IE Bulletin', t< correspond emo
B00724O122 Forwards IE Info Notice Hu-20. "Losi, of Decay Heat Removnl
Capability at Davis-Dt'scc Unit 1 While in Refueling Mode "
u'REILLY.J P (legion 2. Atlanta. Office oT the DiTffcior BO/O5/OO
Spp
60071001^4 ForuiaidB IE Insp ficpts 'JO-PA9/8O-14 ' '1-S70/BO-09 fc
50-237/90-09 on D0012a-OSDl Nil noncompl i nnce Jintetf
KURPHV.C E Region S, Atlanta: Rear tor CuriEi • IT ti on J, Engineerina
Support Branch BO/03/37 Hop
— BOO710Q151 IE Insp Repts •50-369/130-11. -iO -370/11 0-09 !< 50-2Q7/flO-Of on
B004SB-050! Nn noncompl lance noted Major- a=i^s iHEpcctDd
f irff pro toe t ion/prevent ion
CONLQN.T E Region 3, Atlanta, Reactor Cnn » true t ion J. Engineering
Support Branch MILLER, WH Roginn ?, Atl.intn, Office of the
Director BO/O5/33 lOpp
D00702O2O4 Forujartfs IE Info Notice QO-?2, "llrc.it d riiun-a In Contamination
Control Programs " Ho written responop r«o.uiri>d
O'fiEILLY.J P Region S, Atlanta. OffitP oP 1 1> p Director 90/OS/aF3
IP
8007B1O44? Foruardf. IE Circular BO-Kt, "(Jrid iit-i ap Damage in
Hes t inghouse Funl AKsemlilies " No written response renuired
O'REILLV.J P Region 3. Atlanta, Officp of 11.* Director BO/09/2B
lp
B007OlOai,i Foriaards IE Info Noticp B()-?3. "I 06- <i f BuctiOJi to Emergency
O'REILLY. J P Region 3, Atlanta, Officp of *'m Dirmtor 90/05/39
lp
ODO71BQ34<? Re^flc-nOs to Item 3 in IE Bulletin 79-13 All meld joints
considered arceptnblp fnr tontinued svc Util intends to
restart Unit 2 Tonside-rs that NRC concurs m/position t< that
•no further insos are t-<pucted
PARKER, W O Dufcc Pouer Co BO/Ofi/19 3pp
Loss nf Reactor Coolant Pump
" No written response
Fnruards IE Circular 00-15.
Cooling t< Natural Circulation Cooldoun
TBqu ired
O'HEILLY.J P Region 3, Atlantn, Offic
nf the Directo
BOO715OO15 Ack receipt oP IE Insp Repts 50-^69/80-18, 50-270/60-13 t<
50-EB7/BO-12 nn 8OO513-15 No proprietary info
PARHEH, W O Duhc Pouor Co BO/06/23 lp
— BQ07150Q11? Fnruard:=i IE Insp Repts 50-269/80-18, 5O-270/BO-13 b
50-2S7/BO-12 nn QOO513-15 No noncomp 1 lance noted
hHIRPMV.C E ficgjon 3. Atlanta. Reactor Construction !. Engineering
Support Drench BO/O5/39 2pp
— aoO715OOai IE Insp flep.t5 3O-2i9/BO-lB, 50-27Q/SO-13 t< SO-2B7/BO-13 on
B00513-15 No noncompl 1 ance noted Major areas inspECted
structural concrete For it and by ehutdoun facility
HAORIS.J R Region a. Atlanta, Office of the Director
CDNLON. T E Region 2, Atlanta, Reactor Construction & Engineering
Support Branch 8Q/Q5/2B 3po
BOB717O1O1 Forwards IE Circular 00-14. "Radioactive Contamination of
Plant Demincral 1 1 ed Hater Sys t< Resultant Internal
Contarainati on of Personnel " No written response required
O'nEILLY.J P Region. B, Atlanta. Office of ttie Director 8O/06/24
B007iaO533 Responds to IE Bulletin 79-03A, "Longitudinal Ueld Defects
in ASHE BA-3IH. Type 304 Bteinless Steel Pipe " Nn Type 30O
piping in use for pressure piping Future use of piping mill
be reviewed
?, M a Duke Pouier Co BO/06/24 lp
BOO732O192 Adviaos that hanger insp required by IE Dullettn 79-13 uas
not addr<?6SBd in response to bulletin Hangers visually
Inspected as part at response to IE Bulletins 79-02 !•
77-14
PARKCR.W O Duk« PDUIHT- Co BO/Ot/27 lp
aOO733-t>333 foruard a IE Bulletin 80-li, "Potential Misapplication of
Rasemnunt Inc Models 1151 t 1152 Pressure Transmitters
U/Either A OT D Output Codes " Written responsa required
IE Circular so-lit also end No written response required
Q'FIEILLY.J P Region 3. Atlanta, Office of the Director BO/06/27
lp
BOO722O245 Tot-wards response tc IE Bulletin BO-OS Approl S3
penetrations toiuernod Weld defects classified as inclusion
One repaired Par cracking Design meets all requirements of
A.5ME
PARKER, W 0 lluke Pouier Co BO/07/01 4pp
BOO71tOth3 Forwards 800704 RowiKiiin 2 to response to IE Bulletin
77-01Di "Environ nullification of Class IE Equipment "
Replaces previous lubmittal t< B00519 revision entirely
Includes cor ri»c 1 1 nns of minor Errors
THIES, A C Duke Pouef Co HO/07/07 36pp
BQ07320019 Foruarili IE Info N"tUi> nO-2(., "tvaf ua U on oF Contractor
QA Programs " Ho wrltton rc'.pnnBp requirp-d
D'REILLV, J P Region d, Atlatitn, Office nt '-he Duoctor 90/06/10
Spp
B0070100&9 roruiairii update of info to 7VlOSt,, I LOt, 1307 !. H00124 Itvs In
response to IE Bulletin 79-14, Items i! •< 3
PARKER, W D Duke Power Lo BO/Oft/11 iipp
80071At>a59 Forwards. 1C Info Notice BO-S7, "Dcg radntion of fieac tor
Coolant Pump Studs " fio spiaific attion or i osponse
requireiJ
O'REILLY, JP Reginn P, Atlantii, Offirc of the Director
BOO7S501tii Forwards reiponse to Items \,3a f, 3 of IE Bulletin 80-11.
"Masonry Hall Design " Lists all masnnri} uialls which are in
proximity to or have attachments from safety-related piping
or cq.uipFnunt
PARKER, W O DuVe Poiuer Co BO/07/O7 21pp
Ack receipt of IE Insp Rapt 50-270/BO-16 Rept does not
cortain proprietarij info
PARKER, W 0 Duke Pouier Co BO/07/09 lp
9007230418 Forwarue IE Insp Rept 5O-270/BO-16 on SOO42B-30 I, notice of
violation
LEHIB. It C Region 2> Atlanta. Reactor Operations Nuclear Support
Branch BO/OA/30 Hpp
3007O2O7&3 Formal da IE Bulletin tlO-lU, "Coisiblo loss of Emargcncy
Notification tiyi (ENS) U/Loss of Uffilta Puupr " Written
resfonae rpquireu
Q'REILLV.JP Hwgion 3, Atlanta, Office nf the Directnr BO/OA/18
3007100137 HflsponrJs to IE Bulletin 71 )3, "frarking in reeduator Sy B
Piping. " Radiooraphic HiBftiinntlori'i rc-qiiircd bkj Item B
completed ?. un.ii Lpptab]« indiciitioni founil not flnsotifttod
ui/cnnccin of bulletin Indir ,itiurii und»i review
PAnKEJ?,un Duko Pouer Cu lW/Oft'1'/ 3pp
-8007HBO421 Kotici- o P violation from insp on B0042B-30
t, Region S. Atlanta, Dffico of the Director 80/06/27 lp
-B0072BOfla5 IE Insp Rc?pt 50-270/80-16 on 800428-30 Noncomp 1 lance noted
failure' to uruap vent !t diain line's t< to provide adequato
records- re sys draining procedures
WH1TENER-H L , MOON. I) T [legion 2. Atlanta, Office of the
Director UPRIGHT. C M Region S, Atlanta, Reactor Operations
Nuclear Support Branch BO/Oi/27 3pp
DOCKETED ITEMS
73
0007270367 Forwards further response to IE Bulletin 79-13, "Cracking in
FeediuatBr Sgs Piping " H Thmlsch BOO53 I final rept, "E.am
Df Radiographic Films t, Hold Integrity of Pips Dutt Wplds In
3-lnch DD by 0 300-Inch Aunliarij Ft'Ednjatcr Piping," end
PARKED. W 0 Duke Power Co BO/O7/10 SOpp
B00731O491 Ack receipt nf IE Insp Iteft 50-27O/eO-!9 on B006.17-1B
Np proprietary info
PARKER, W O Duke Power Cn 80/07/1A tp
Q AdjuillCiltnrij
-8007310495 Forwards IE Insp Rcpt 50-270/BO-19 on BOOM7-1B tlo
noncomp Ha nee nnted
MURPHY, C E Region 2, Atlanta, Roactor Construe ti on t, Engir
Support Branch 80/07/03 L'pp
ring
80O7Q3O432 Fai wards Director •
request for revocation nf DL
p Ian t dec omnu-s ii on ing
DENTGN. H R Dffne of Muilo,
m inidir Id'-J
i tut i on oF hi
-.tar Reoulat I i'n. Director
~-BQ07Gi2O437 Director's dec.i-.inn under 10CPR2 2O*i denying SF The
BOO429 requp-t for revota t ion of Cll ', institution oF
hearings cm pl.ini dec onin.i i.&i nn i ng Al 1 pg.i titm (if unsafe waste
dis-poaal oping tt Bated in prcprised c ulemak ing^ KXFW5O, 51
DENTON.H Ft Office of Nuilt.ir lUrtrtor Regulation, [Jirecbor
HO/0(./1 i Jpp
-8007310501 IE Insp Rept 90-270/8O-11? on 800617-iS Nu none omp 1 lance
noted Major areas Inspected feedtunter sgs piping as.
outlined in IE Bullotln 79-13
CRdULEY.n R Region 2, Atlanta, Office of the Director
HERDT. A R Region 2: Atlanta, Reactor Construe lion ti Engineering
Support Branch BO/07/01 4pp
80073102-13 Fomards Commission R00527 JIIBHIOT andum '. QT lier cnnt
deciaiims on UCS 7BUSO3 pulilion For reconnrloTata on [if
7BO-tl3 memoiaridum '- order urs 771 lOfl petition sought action
re fire prptectipn f«>T f'lectriLal t.ibleb
EIBEMHUT.D B Division of l.i t ent-ing i!()/O6/3!J «9pp
S Reportahle occurrences. LEfls d related c Drrosporidenc e
B007070319 Foi-uarrfs LER BO-01B/03L-0
PARKER, U 0 Duke Pomer Cn BU/O6/30 3pp
—8007070333 LER BQ-01B/03L-0 on HOOiOl.high pressure svc uator pump D
declared inoperable due to rnntor ceoler tube leaks Caused bij
erosion d corroHion resulting Prom constant flow nP lake
uater Leaking tubes soldered t* cooler preasunred
PHILPQTT.F T DuVo Pouier Co BO/06/30 lp
BOQ70BQ2Q1 Foruards LER BO-003/01T-0
PARKER, W D Duke Pouier Co BO/O7/O2 2pp
— S0070B0207 LGR BO-OO5/01T-0 on BOOA17, during RCS heatup, incons i stont
uoron rancentrati on mea&urementE obtained Cflus^d by poor
mixing in core Flood tank Unit coaled down t liniic acid
added MptliodE under evaluation TP maintaining concentration
PHILPDTT.F T Duke PDIUCT Cn BO/07/02 lp
80071B0321 Forward* LER BO-007/01T-0
PARKER, W 0 uufce Poyar Co SO/07/10 3p p
8QO7O2O6391 Order [(1 anting eitonsion until 000711 for Commission to
Elect uhBthcr tn ri-vmu Director's BOObtl denial under
10CFRH 2O 6
CHI1,K.O J afflto of thf Sptrt'lary nf the ComnlBSinn QOXOi/27
IP
H General correspondence
BOQ702O117 Res-ponds to BQfMya 1 tr uncaiirriging fIFIC to meet u/VT Vankco
necommibEioninji rtl!iancc IVVUA) NRC nipt u/VVDA on BOOiai (.
receivfld pctttigns requesting mimed i ale plant shutdown
DIRCWB-W J QFFne of the F.i«tulivc Dirc-Ltor for [Jpeifltinns
BO/0&/1F3 lp
B007020fl51 rtdvisp-, that NUT knows nf nfi pl^ns <ir proposals bi) util to
change type or mrsintities of Tylejtpf From facflitij into
CT River Releases remain uiithin limits Hods required on
long-term basis tti increase safely in I.HCA
NOVAK, T M Ascistant Bireclnt tur fiperatins Reactnrs BO/06/ie
2pp
— a007020159 Roquesti. that MRC derodni! ulil hold publtt hearing re
possibility of utll dumping more uiaslos intti CT Hivcr
COJI.S Aff il lation Unfcr.oojn 8Q/O1/1O 3[ip
—6007100326 LEfl BO-OO7/01T-0 on BOObHfa, ui/un 1 1 at 10V. p nuier, hum! rfi ti| in
penetration room Found to be utiuvo 7OV, Caused liij steam Icafc
on fceduiator valve Humidity rntlucail to 50V. * sys declared
operable within 3 S-h
PHILPQTT.F T Duke Pouinr Co 00/07/10 lp
B007220963 HO on B007Q9. high pH excursion in oil collection basin
discharge was discovered Caused by uiater discharged from
upper sump oF BaFe shutdown facllltii const Const personnel
Advised oF discharge limits
PARKER, H D Duke Power Co BO/O7/li. 3pp
B007(10OBa Responds to BOO4I9 1 ti TflFeMed to NRC b ij Senator C Ketinedy
ro environ f, uinter anfety in CT Ifivor VdHey Forwards
supporting Info findi ulog-ital rtlense1, arc with in acceptable
limits Ang abnoririfll release!* ehould b« reported W/o encl
OENTOM.H If ftfFifK of Nucleai lieactor Regulation, Director
aO/06/35 Spp
— BO07110073 PnrwnTdR 1) Wont H001I9 1 IT ID lenuosting info an nnviron '
ustai safety re util uanjie o-T CT R i VIT for rad i olug i cal
r-clodtea Req.u6JEts rce-portf
KENNEDY, E M Kenatc BO/04 '£4 Spp
6007370024 Foruards LEfl BO-O06/O3L-Q
PARKER. W 0 DukD Power Co SO/O7/23 2p p
— B007290B30 LEU BO-OOt/03L-0 on SOOfoH1), ot 1OV Pull power, valve SLP31
Failed to open electrical 1 g on command Caused by loose
Botscreui on motor driven pinion BCTDUJ repaired
JBNE5. J U Duke Power Cn 80/06/26 lp
DOCKET 30-371 VERMONT YANKEE NllCLErtll POWER STATION
F Security, medical, emergency f< Pire protection plans
B00707O217 Adviaoa that revised draft emorgencii plan in rospons.0 to
NUHEG-0634 mill be submitted by 600725 Requests
clariFicatlon oF NRC -schedule For umerDoncij plan
concurrence
8MITH.R L Vermont Yankee Nucloer Power Corp SO/07/01 lp
H 007 2 1004 9 Requests mod of provision for a it equate shutdown capability
to meat oncl Fire protection soFetg evaluation criteria
Status summary oF open issues & evaluation oP safe sliutdoun
capability Following Fire in three plaint areai end
1PPDL1TO.T A nporoting tteactors Branch 2 BO/07/03 15pp
B007380661 Forwards final revised emergencn plan lulnch artdroasus
CDmments described In encl to DL Ziemann 800114 1 tr bo JA
Kay Si RL Smith Cmnrgency plan av<)il-ibli? in Central riles
only
SMITH, R L Vermont Yankee Nuclear Pouor Corp BO/Q7/25 lp
B0072104'1B Hetiuesta adilri'Ss thHilst1 FPI MRL c L>r respondent.*) ro License
DPR-EB From ,JH Abbey tn Rutland, VT to HP Cnnwiig tn vornon,
VT
SMITH, R L Vciraorit Yankee Nuclear Puuior Corp HOV07/16 lp
B007300394 Advitpr, that time peTiiid for considers Lion of Director's
deelsinn to dang roquesl for license rcvo c a 1 1 o i. t, public
hearings For Piliititij tins planT.pl! ui/c> fommi EB i on taking ang
rBvieu attiun Theref ore> d ec la i on is final NRC action
CH1LK.B J Offtcu- OF the Sucrctrtry of the CommiQ^ion SO/07/Sfl
IP
1 Financial inf or mat i on
BDO7C110:i77 F-ormai tfa idt,ti flow inPo by calendar qufirt-ers for comp.inu *'
cash info For sponsor tonjiisiu v-t, •for CVBO
CAREY, H H Vermont YnnkBB NutleJT Power Corp SQ/0£>/S4 flpp
Operating 1 IIUHEE a tuge
8C07230OaS Summarn (if 800,307 meeting w/Mark I munera gniup in Oft t
MD, ro reviiions tn NfiC sceeplfnic* ttiteriti !• nut&taniJ ing
isBU*s relative to hlarV ] cnritasnmc-ri! long- term program
CfMMES.C T Pljnt SyEtemi. Crjncfi ffii/03/Pl ^Ipp
90071*0777 Cnnfirms BQ£it>S7 rtigt mnotiny tn tie hi'ld at Facility ro
regulatoiij pur Formiincf of fjicility AgijnJa mcJ
GRIEfl.D H Resntin 1. Pli i lodelfiti i rf. Office of the Diroctnr
Spp
74
DOCKETED ITEMS
BQO707O34J, Responds to NIK 000507 llr.ltcra II K 3 4fa.re THS-S rMatec
requirements t, dde^u-icu of GE (30027 I Itr (!E Itr ia
adequate !< dp p 1 it .ib-le to Facility
SMITH, R I Veirannt. Van tec Nuclear Pounr Corp BO/Ot/30 Ip
0007140525 Summary u-F HOOftfl nesting u/util >n Dethesda.MQ re possible
proposal of riiiJwflste incinerator Process info bulletin enc 1
RODNEY, V i- Operating Hefti tor-* Hrflnth 2 80/07/02 Qpp
Ei007l1Q33a F-Qrusrds VPUAP-I -A, l?e ji <, ion 8, per NRC B00703 request Also
foruiords document change ills true ti BUS tor removing J<
Inserting correct pdgoi
HE1DER.L H Yafltue rttomlt flcltilc CD RO/O7/09 3pp
— BOD7I40348 ftdviSE"= th.tt Yfl(fAP-I-rt, HBVI s I nri 6, ) a acceptable Programmatl-c
changes should lie submit I i>d t« NSC for review prior to
implementation Requests that Itr rep I nee BOllflJtl Itr !e rapt
be renumbered w/revision (j submitted to NRC
HAASS, H F> Quality Assurance Branch 60/07/02 Ip
BOQ725Q<IBfl Comments an NUHEC-06 I**. "OUR l-ecduater rfc-nle ?t Control Rod
Drive Return I me Noiile Cracking " DisagrBes ui/pabl ti on. re
interferenue Pit spargers Ha tracking aF nonle regions
experienced natu nf Dot 19B5 VGC ummeTided for sparger moil
SMITH, R L Vermont Yankee Nuclear Pouter Corp 30/07/13 Ip
8007290439 Submits alternate method of mitigation effects of grid
degi-adrttinn (in -iaf Dty-ro laird cluciTicnl eiiuipmBrit
Engineering for mods will be completed by Nov 19BO
VAHDENDURGH. & Yankee Atamit Cleetnc Co 80/07/21 7pp
fl0073103fii flutllnes proposed ucKedule For torus nnuda-por QOO623 telton
Last tup I tfms listed utll be imp 1 emunted only if Further
analysis t< tfstintJ &hotvs need Mud -5 ulnulri not be CDJTIJI 1 ekec)
untb! Fall 19BI i&fueling outage
SMITH. Fj U Vermont VnnkEE Nuclear POUIPT Corp 00/07/33 3pp
Q InGimcLmn reports. IE Hulletms t. con respn-ndence
BOO709O37O Foruards IE Insp Wept W-S7] /HO-O'J oti HOOP2J One item of
nonionpli jcicc noted
OfJIERpQ H Raflion i, Phi 1 adi 1M nil Office of the Director
Hpp
— atl07D7037,T IF Iri6fi Rflpt ^0-271/011-0,1 on Q0033I Noncomp] i anca noted
failure to package 1 ou specific, activltij waste package so
that radiation. lev&]5 frtun BirrFace oP package UB-I-C within
given limits
KIHNY.U U , R(WMO?JQ, W -J Hogion ], Philadelphia. Office of the
Director CHQCKEJ). H H Region 1, Phi ladalph i n, Fuel Fac-ility t<
MalarlalB Safety Branch BO/O3/?fl 3Vpp
Forujarila response to IE Bulletin BQ-Oi, "Engineered Baftt^
Feature (ESFI Reset Controls " All safety-related equipment
remains in emergency mode upon reset of Ear actuation signal
7R10DLE.J E Vermont Yankse Nuclear Power Corp OO/Oi/13 3pP
Q00703O7O4 forwards IE Dulletin 90-13. "Possible Loss of Emergency
Notification Sijs <ENB> IJ/Loss of Offsito Pouer " Written
response required
OHIER.Q H Region I. Philadelphia, Office of the Director
BO/Q6/IB Ip
6007020520 Formal ds IE Circular BO-19- "Loss of (leactor Coolant Pump
Cooling t. Natural Circulation Cooldouin " No uiritten response
required
ORIEH.D H Region 1. Philadelphia. Office of the Director
BO/Qi/SO Ip
aOQ71BQ549 Responds to IE Bulletin BO-09, "Hydramotor Actuator
Deficiencies " Facility does not use actuators
CtJNVIAY.ll F Vermont Yankee Nuclear Pouier Corp 80/06/30 Ip
BOQ71B051A Responds to IE Bulletin QO-1Q Measuros described to privent
uncontrolled rpleaiea or contamination of nonradioactive
ay s Administrative c untrols, harduiare mods & process
ra 1 1st ton rannitors added Sampling program expanded
CONWAY.W F Vermnnt Yanloo Nuclear Pouier Cor|i BO/06/SO Ip
B007I60750 ForuiardlB IE Circular 80-14. "flad i nactivo Contamination of
Plant Demlnera I i icd Water SIJB t, Resultant Internal
Contaminatlun oC Porsonnol " No written rosponso required
GHIEfl,B H Region 1. Philadelphia, nffieo of the Director
BO/Oo/24 Ip
8007210290 Foruiariis IE Info Notice BO-21, "Lou Level Itaduasti BurUI
Criteria " No written response required
H flegfon 1, Philadelphia, Office of the Director
B00723Q1B£ Forwards IE Bulletin BO- 16, "Potential Misapplication
Rosumount Inc Modals 1191 i 1192 Pressure Tratismi ttors
H/Either A nr D Output Codes " Written response roqiiirN
IE Circular 90- ii also end No uritten response required
OBIEF1,D II Region 1, Philadelphia. Office of the Director
BO/06/B7 Hpp
B0070BOB'?3 Foruards Revision 4 to inservice intip program
BMITH.R L Vermont Yankee Nuclear Power Corp BO/07/01 Ip
— 6007Oeoal?fi Ueviilan 4 to inservice insp program
HI Vermont Yankee Nuclear Pouier Corp HO/07/O1
OD07140433 Fojuaprts IE Bulletin 80-13, "Cracking in Care Spray
Spargers " WTitten response required
GRieS,D II Region 1. Philaitelp.hu. OfFite of 11, o Director
BO/03/12 Jp
8007230699 Responds to notice of violation t. notice of proposed
imposition of civil penalties, Irancml tied tuj HHC ROOSO? Itr
Uti 1 a-dtnini s trat i ve procPdure For raduaste B*ilpments reviaed
to require instrument surveijt Penalty payment &nc 3
CONWAY.H F Vei-rntnt Yankee Nuclear Pouier Corp BO/03/37 Sff
8007020125 Forwards IE info Notice HO-23. "BreaHiDUinB In Contamination
Control Pro&rams " No written response requited
ORIER.D H negiDn I, Philadelphia, Office of the Direetnr
80/05 /BS Ip
Acl! receipt of BOWSf Itr infoi-ming NRC of steps taken to
corvec-t violation noted in IF Insp flcpl 5O-a71/79~lfl
3MITH.G H Region 1, Philadelphia, Fuel Facility t. Materials SaPety
Branch so/03/39 10
B007O10HB6 Forw*ros 1C Info Ho Hue BO-B3. "UD5B of auctinn to EniErgenCu.
Feeduater Pump s " No written cBapori5fl Teqtiirad
OfilER, B H Region 1. Philadelphia. Office of thf Director
BO/05/29 Ip
2S Fi.ruariJs IE Info Notice SO at, "Evaluation of Contractor
OA Programs " No written response required
ORIER, D H R&9it,,i I, Ph I lade Iphls, Office of til a Director
BQ/OV10 Ip
8007140579 rcruaiiis IE DulUtni 30-14, "Degradation of 3HR Scram
nischarge Vul CapaMlity " Hrttten rc-aponsc rrqulrnd
CRIER, D H Sis r, ion 1, Ph Ll^ilcl phia. dffict. of the Director
60/06^12 Ip
e0071101i>0 n»aponds to NRC 8004,10 Itr re violations notefl in IE In*p
Hapt &0-271/BO-06 Appropriate personnel reinatructed oh
importance of completing all itemo on forms Correct data far
Scram Test 94 recorded on nocesaarij data sheet
HEIDER.L H Vermont YanVee Nuclear Power Corp BO/07/03 2pp
000721O57? Fteaponds to IE Bulletin 80-09 Util USBB flued head dulgn
for penetration connections tt other designs u/ containment
boundary butt we Ida ABME Code. BBC t i on III-19AQ edition,
applied to fabficat ion t< inBtelletlon
HEIDEH.L H Unrmont Yankee Ngclear Pouier Corp BO/07/O7 Off
8007250173 Forwards reply to IE Bulletin BO-11 re masonry ujflll d>ilgn
PrioritiiBi) list for further Evaluation end No further
justification is required for codes used afi basis of
re-evaluatl on
HEIDER.L H Vermont Yankee Nuclear Power Cdrp BO/07/07 flpp
0007350189 Submits re>ply to IE Bulletin BO-17 r» failure o* COfltiol
* rods to insert Required tests uiere performed & scram
discharge vol tt associated piping are Free af obstruction*
ME1DER.L H Vermont Yankee Nuclear Pnuior Corp BO/07/OH Spp
BfrD73fl0422 Confirms oral notification that 20-day periotf for to»pl*t I (if
tests requireit by Item S of IE Bulletin BO- 17 started on
8OQ7&B NRC licensing project manager should be notified IP
test ujouli caUBo severe impact on pouer reliability,
QRIEft, D H Region 1, Philadelphia, Office of the Director
BO/O7/09 2pp
8007300014 Acli recelot of 800337 Itr forwarding paymont of civil
penalty '• (I istusstng corrective actions. In response to NRC
S00507 Itr
BTCLta.V DPfice of Inspection !< Enforcement, Office c-f th*
Director 8O/O7/1S 2pp
DOCKETED ITEMS
75
H Period IE operating report^
1 1 .stt'd CUT respond once
9007210436 Forwards "Effluent !• Waste liitpo^ol Semiannual Kept.
Radiological Impdi t on Han for F"irst '. Second! Ouartprs
Veimant Yankee Nuclear
ei Corp
— 8007210'1(>7 "effluent ft Waste r)i5po = ,il <•!<• ml annual Rep t. Had 10 1 ng
Impact on Man for first f. SDI ong (tuarteis 1977 "
« Vermont V,ink»B Nuclear Power Corp 79/OH/31 47pp
800731024) rt.rwsTdb
decisions (in W 1
79Q11J mtmarrtiijiirr
re Tire pi-t.ti'1 1 i
tJSrWf'JT P 0 ui
Ufi. 77 II '."1 pc
er1riL.il t: aL 1 1
c lirrnung
8007I0039B Forwards monthly o(iE-r.iting rcpt tor June 1 9BO
CONWAY. W F Vermont Yankee Nuclear Pnuipr Cnrp BO/Q7/OB
--00071B0400 Monthly operating I ept fur -fun* IDHft
BURGER, F J , BEERS, T C Vermont YsntGo Hue ICE
BO/07/Oa iipp
B Rcportable occiirrnnq BE, LEFli. fc i elated t f rre spondenc e
BQQ702054O PND-l-BO-091 on BQQ&l I , p lannfrd di"<juoll entry ujan conducted
to iiweatlgate suspected reactor tnolant leak-i Investigation
revealed leakage originated from ga^heted mechanicaa jnint
Tach Bpat criteria lowered Plant shut down
flAYHOND.U J , HAHTIN.T T , BriUMMbR- t: J Reomn 1, Philadelphia.
Office of the Director SO/OA/r13 2pp
8007010317 HO 79-209/lT,Euppl 1 cnc 1 BE loose parte analysis addresses
pDsctliility that wjit or rod lotiiei end plug cnirld wear to
extant that shank mould treat Li-censce concui^s u/concluiion
that (jeneratinn of louBo part is uneipoc tod W/o one 1
HUflPHViH P Vprmnnt Vanttee Nuclear Poiuer Corp flO/OA/23 lp
DOO71001/b
B00701O39I ro
MURPHViW P
mards LEO QO-Oi iiyOlT-0
Vcrmunt Yflntc-u Nun. I par Pauier Corp
—0007010409 LCt) BO 01B/OIT-0 on BOOfil 1 - t oedua tcr llneE found leaking
directly into torus d bippntEing itotecttnn &yi Caused ty
dryuHll leatiigtt Jetcitlon ays desisn i nadequai. y Tech ipec
leatiigt' Simlts reduced Lirnitu !, detcttion eij-s und er revieiu
MURPHY.W P Vermont Yankee Nuclear Pouiev Corp HO/Ot/25 2pp
9007O7O260 Buppl 1 to RR79-aS-/lT concurs ui^conc 1 UE! ons at end GE
proprietary info on loose parts analysis that uiater rod
louier enit plug unuld wear t cau&e shank to breat GE info
withhold (ret IOCFR2 790)
MURPHY. W P Verrnnnt Yankoe Muc leal' Power Corp (10/06/23 ly
B0072301QB ForiuardB LER BO-OEO/03L-0
MURPHY. W Vernorit Yankee Nuclear Power Corp
— B007aa01B9 LEO HO-020/03L-0 on OOOfal?. PC 1 5 valve FSO- 10=>-7iiA. failed to-
close after scram Caused bij rtift nn plunger assembly Valve
cleaned & returned to avt
MURPHY. U Vermont Yflnkie MucU.ir POUIPT Corp BO/07/17 ip
DOCKET 30-372 9AUEM NUCLEAS GENCRATIHO STATION, UNIT 1
F Security, medical, emergency £< fire protection plans
SOQ7QBOQ&H PoruiardB Gubmittal 1- to 13006H7 sccurltij costing encij plan
Bubmittal withheld (ref lOCKftJ 790)
UIDRIIZI.F P Publir SDrvici> Electric to Gat CD of Ncu Jsrsoy
QO/06/30 lp
B0071'10429 Requests approval to proceed ill/inter ill) ufic at training
facility in Oumtnn.fW UB noartitB omeraoncif oppvotiofis
facility
SCHNEIDEH,r W public Servico Electric 81 Gas Cn of NBUJ Jersey
80/07/03 flop
6 Ad jud icatory corroaponderice
S0072B05S9 Requests placement nn svi list as friend of cnurt in ord-er
to receive copy of all papers Nerved
WEDQ.M Affiliation Unlinuu.ii QO/O5/ 1 1, 2pp
6007300ME Rcqneats incluakon in fijlem wr lilt to Titcfliwo all post-
BOO323 dnciimentE, 6 preventing \ out tmniiij res-pontf ing to NRC
UitnessDc' claim against RE WnltU ti-tt tmcintj
UEDD.R E Affiliation Unhnuun
of !flU uii Cnii tcril i
(. Una' d QiTB5 tmn '
AVREU E5 T KOLJ J<
— a0071(!Ol"'fJ Intprufnor Col
of Idiu oil f (intent inns t1
rcattDr a 1 ternat i •jc-, in
754 '< ? /io
i B C ilt>u J&i s,
.tri'- pinptiscd findings of f .11 t '•
I,. Hoard UUP"- ti on b t- aiMi]-from-
i t or itatn.*- w> Board BOOSti1? nraer !.
&00715O50V Heplij finding*, nf
paitial initial diiitinri su
Findings, in rpsponup to AtL
Questinn 5 nn au'ay - f rtim-rt
WETTEHHflHN.M J . HJVL1NG R
Jersoy WETTERH^HN. M J roniXM , Moore J, CoroPr GO/07/ 1 1
jc( f. cunc i us i nns -&f Inu in form of
sli ti>1 my fur lUi'nsee IiiJOfel3
L3f)O5f!9 i>rdPi f< ASLH GDCIfa3&
tor istucs- W/Ccrti f Icdtc of Svc
Puhiic 'iprvitp Clcctnt '. Gas Co of Ne
9ipp
J Insurance
indemnity iiif r>rmnt i on
80070105.23 Coriijarfls t-.ndorB*(npnl JS to AMI fnlity Nl -*'3Q
A Harsli !< McLntinriii I m j PI '. M Mucleai ( nnsu Itants
80073103^2 forwards FnJor stment "3 t u NftFI U PCJliri; Hr-"SO
COKRF/i.H A M.irsh '- Hrl Ptinoii, 1 nc . H •< ttfluMcaT Cunsu 1 tdn t&. Inc
Diu BO/O//3? 2p(i
37i Toruarrtb fr-rtor semen t .ICi 1 1. ANSI F'olicg tJF-330
CORRCA, M fl Hareli !- Mel enn.in, Inc . M *. M Norlear Consultants, Int
IHv 00/07/2) 2pp
P Ojivratinj) license strf-gt doiurnphli ti f or respondent
0007230-1199 nBquo-its subnitlal &f propoied Tetli Spec rlisoftes providing
for- rudimclsnt y In rtocsg Mc.it rc'inikviil d.|j jl i ] i tij in si) modes
of npetation NodPl Terh 8pi>La uhirh umili) prnvidf flicpptBhle
rcaolutinn tui.1 f-or pin darn P
EISENIIUT.D G Division of l-irrnsing nO'Oi/11 ft?p(i
flOO7110156 Inform" that aetonJ inter JIB n-pl, per fiicility J16(h) plan
of studvpuill tic il is tT ibuCed Ln tpcliiiiro) Hflvisnry group bj
000625 Delaij r,TiiitiI by coraputn iir(jlj'&ra !j[it<ni] t tisl diite
should illcw enmiy.il time (or IEV.IMU liotni e 000709 meeting
SH1S3A1S. J ^ PublJt Ser^itL Flptltir !. O.ia Co o^ flew Jersoy
BO/06/ 13 2pp
30070302^9 Formaril^ rosporist to 1100"<J4 con f t rrantory orders re los.s of
nun-Class IE in? trurni'nlati <JM t- corttriit pouiei IJUB Info
written for Unit L.but al^a upp 1 1 L.ili 1 o for Unit, 2>i>icept as
noted Includes rpiptinbii tD IE! CiTLulnr 7i?-OE Affidavit end
SCHNEIDER. F U F-nMU SDTWIHJ Hlpclri' !. Oat Cu oF New Jerteij
33pp
9007070290 F nruiard £ respoi.sea to full powi r IICMISD rrquirements
identified al NRC HOOdl7 msi-tiiig
MITTLiK U Public Sprvire CliMtrit fi Gns t u nf Nuui Oprseij
— 60O7O70yflV Teth Ipec Hagpk T/4 7-r' tfiriiugh 7 7 fot Hiinliarij Feeduiater
sys & ai.nJiaiy fopii sroiiise liint Related due umentet ion
enc 1
• Puliliq Bcrwiri' Electn* !- C3«- fu i-* MPUI Jersey aO/O6/27
Spp
B00703OIA1 Forwards add 1 i nffl I n i-pspDnst tc MdC fHSOSiJO requeEt le
auiillarij fpeduidt«i uijs Auiili.iry fei'du,nt*r 5ijs foi both '
unit! are iitpntit.al In dPiign. inilurtiug pqiri [4incnl ">
automatlt initiation logic
MilTll-.n I Puhliu Sprvici' ITleiliir * f.as Lo nf Menu Jer-scy
BO/07/01 13pp
a007HS0001 Reique'it* sulimi 4 tjl u( H|.|I] J ' at i nil FBI ameiui to 1 icfns?
tonsl'iling uf Tutli Gpe"- chuiiaifx, ', lnti>s« .onditlcmi. PHR
ModBt Toil) HpB' a >, MnrtSl lirenso- ccud itiot'^ -for THI-P
LBSSRHE LeaTneil C.itegurg A * terns en' J rnf Diinlante
UISEHHUT. D 0 Dt^liion nl l.ni-niinu OO'T'iOP Vpp
DOCKETED ITEMS
tlJ (I 1 ',! II- ' 1,3', I .11 I Hill pi. Ill I If
li f L itt'iisniQ Urui.Lh
iJ.y mpt'ting ui/util in '>&n IUIB nplEpa,
OOVOEOJ'M rnruarMi noup nip r i P t.irij nsr-ilim* of pTPVUiualij suhml t t ntf
goner ic (Juit imjlinii' i (> r»(,i r i I't.ii-ij 1 IT i tu *unpm I posi t ion
on giiiiJc t IIBLI u rli.ir-.3c tp-i i i^-t 1 1 L. KPHUEI-S t =. ai fc nuuil udgement
of rocgjpt
CFiAHCi P A P.x iftr f.^s t. Lluitrlr •" n Ill/Gb'21 lp
E NHC Safety Evaluation Rupert ISER), suppls & ct
5 pond one i
BtH>711O033 Forwards Suppl 9 to facility BEFi
SCHWENCeR. A Licensing Drench 2 60/06/13 3pp
— aOG7HQO:i(b Suppl 9 to Facility SEF1
* Office of Nuclear Reattor Regulation, Director- NURGO-Ofc75 89
BO/0&/3U B6pp
ruru.irils «. to t eraun t i,f juiljnj re i pqu 1 1 cmtiii to. to bo met for
CUTiont <)1. -app 1 u lit inns, =11 derived From HUKEG-OfifiO J. Found
in NUFllIB-dfiVfl
MGtNllin.n t! Dwi«.n,n i.f I if Busing
K)07SJOoJ5 niru.il ill .,trt urdLi I nr DOC ward
MArTfaON.lt J Dwininn of '!,>fi>ti, fct h n« 1 n p ij TIN rt-1121-0
F Security* medical. Emergency fc fire protection plans
8007130377 Foi-yards Revisinn t to security training & qualification
plan Revision 1 withheld Iref 1OGFR3 7-?0>
CRftfJE.P A Pacific Gas fc If let trie Co BO/Q7/11 lp
O Ad judicato.ru topre*pondonee
--B0073J069J 'ltd iTrJnr Tor I}OC unrt "Ffeviou. of Auxillnry Feediurtter Si/8
liuliabi li ty f ^.ilnsLiun SLuulcs for Diablo l-artyon IP
JlcOuiTe 1, 'iumjiier 1 t. 'inn Onofrp 3 t. rtCS ftnl tahi 1 > tij
Ana ly 6 1 6 uf rl.iniiiil vo An Mima t i c " Issued to 'inndia f.ntis
UHCNICH.n I Divioluii nF Safety Technologi] FIN A-I1S1-0
"PP
13007030048 Request For participation in security plan hearing per ABLE
791116 order admitting State of CA in DL proceeding
Participation will a&Bist in adequacy EC workability
assessments Notice -of appearance % Certificate of Svc end
BROWN, H H . KLINE, J A California. State of QROWN, H H Hill
Cliriatopher & PhUlipe SO/Oi/l 1 9pp
300/OTOIB'l Foru.ii6n floviHjon 1 to "Dose rip 1 1 on of '5ij B Tnlm-ac t( on
Pros rum f'"" S>»i "miiral ly- Irtdiici>d Cvunt'it" aiiginallij
sutinmttud OOOIiJ?
E. P rt P.icif>« i>j5 f, fcUrtrii Cci 00/07/01 In
—8O07(J7CE'l)fe He vision I In "Oiffir r ip 1 1 nn of fiijs [ ntrrHC tiDfi Pro^i am for
aoisnil t fil li;- 1 ndu-L oil Evontn "
B Cnttfit •Qnr- *. ElBLtrlr To
J007 1 !t(l3</3 rnnuflvdh 5itd Orile' tor DHL Wnrlii "Sij a Interaction Support
for ni.ihlci Ciinifon. " icoiiud- tc LLL
DOS1!. E) J" Diviilfin nf Bystnrnc Intogr.it i an TlNA-OEilQ-O SO/O7/07
iU llrdpr for- Dllt unrt '"Syi. 1 ntorac tlon Support far Diablo
Unicil 1 1> I LL
[IffliP of atotibdPtla Upvolnprnc-nt. niioctoc FIN
A-OPflil-O {(0/0//01 opp
7;'3003V Hot if iratinn ti f BOO/IB mputinr] u/util in Bethefldaj MD to
uview iiuiiliirij fninluJfltur tiijt. rp 1 i.ih i 1 1 ty >jtudy
, [) C I t con sine. Uraneh ' BO/0//00 4pp
nummary n F HOIK,17-1" Bite visit w/WrtCiUtil t. two intei-venors
ra a till 1 1 of IUH Jii lertte t i an pi ogram Fnr sol smiciil ly-lnduceil
cvsnt-i Proijr.im is sound Fi con he BritisFnc tai-l lij tu^iplolBil
I nil Dp end en t w^l kdnun Hcccrlpl Ion micl
THOMAS i C 0 Sijntmnft Jntwrnitian Brnnch HO/07/OV flpp
loTworilq Jrnft npi»i«ttng I'riic-odurr OP-'IBi "flntic Ipfl
Tranaient W'n Trip," \<ar AC THadonl ronuBot Procedure
should nut 4iv r utia i dordil pavt of docket flln ditpporting OL
Pactfli Onn S. FlettrU Co
lp
P0071f,05r'l "Anlit ipnlod Trnni i imt W/o Triii. " emu r g unc ij operating
procoduTD
* PnulHr Snt. ', Lluctnr Cn FJO/Od/07 "ipp
OO/c-'^ornFl DtoruHseii aui|(tiBntiJil IPUJ power atsirtup test prnsram for
near- turm 01- appl i i nn is EacJi applicant mutt (nn-furm InBts
similnr t-n TVA prupoaiud pniBrnm PrDEidiint Carter 791207
slntomont on Kpmoiiij Commiflu i on runt ilnel
eiSCNUUT.B 0 Ui/iBiot> of liionsing BO/07/11 fcpp
rnriunrils Hcvlsion Z of "poser i j»ti<m at !!i(5 Intaractlon
Program 1a< 'jimmic.il ly-li, due utl llvonts "
CRANt, P A Pocillt Ofltt t: llcitrii CD GO/07/IH lp
uvtiiiiin r1 tii "Ilcori ijiHaii of S
imirfll lij linlurad FTvuntn "
Paclfli r«i' '. ClBrtnc (.u BO/OJ/O'?
Interaction Program For
OOVy*il>!JiO Notif n fltmn of CW&7HP rticeHno w^util in Qetlicsila, «D to
dJstiria Auililiiiv Peedioator t'i'> Maattno oviginally Erh^iJulBd
for BOO ^ Hi
miCULEV.B C I Irtmiiiifl I!) rtni li ') EIC1/O//I7 Bpp
Ack receipt of Commission BOO611 memoTandum t< order, CLI-BQ-
34, on beho-lf of 3nn Uuis Obispo Hachcr^ tor Peace Adheres to
prior position re Comnilss.loncr HeTidrie participation in all
aap&ct& of PL p-roi ueding re seismic t eafetij issuer
JONES, V I Janes. QreiJ tt Hsyley BO/OA/19 2pp
0007100198 gipreisen apjBi-Bciat i nn for NRC pormistlan alloulng joint
intarvonDr rcprEsentat ives to participate in SOOA17-19 sys
intwraction audkt at util NRC has demonstrafce-d mil I ingnesa
to assure public participation delated corres-p ondence
FLEISCHftC.ER. D S F 1 eischakev, D 8 aO^Oib/25 lp
BOO 73 102-4 3 Forward E Commi as i tin BOO 527 Memorandum & order containing
decisions an UCB 790502 petition far rec nnBld&rati on of
780413 memorandum t ord er UCS 771101 petition sought action
re Fire protection fur electrnal cables
EISEIMJT.D 0 Division of Licensing BO/O6/25 S9pp
OOO7300'I19 Notice of appearance in procaeding Certificate of Bvc oncl
B California. State of BO/Ofc/30 4pp
BOO70701&3 Advitec c-f stipulation in OL proceed ing, eliminating legal
argument re wording of affiSavit of nondisclosure t, public
d i ssQininatton of info Governor Drouin of State of CA did not
take part tn stipulation
TOURTELLQTTE, J Hearing Branch 4 JONES, Y . NORTON, B Pacific Qas
ti Electric Co BO/O7/Q2 Spp
B0071J0002 Order urantirvg Eitcnsion until 600733 for Commission to
slact to revleui decision on enForcement action Tequeoti
DD-flO-32
HOVi-F.J C Office of the Secretary nf the Commission 90/07/08
SOO71BQ405 Motion For OLE n ei-mi ttino fuel loading, initial criticality
procaas fc low pniuer tosting Propn-aed operation may be
conducted ilu-ring appeal fr-om ALBB 790927 partial Initial
decision CJ/doeuraBnteti on. affidavit EC Certificate of Svc
CRAMS, P A Pacific Qas t- Eloctri-c Co GEHR, A C Snell t. Hilmer
NQflTOH.D Bruce Morton SO/07/ 14 13pp
BQQ73EQQ92 Memor-iitdum !< order amending k reissuing ABLAB 000403
protBttlvfl order ro security plan Oovernor of CA request for
participation a» interested state granted ui/cnt-tain
cnnilitions Bets tiraBtable for- future proe eedinoa
BISHOP, C J Atomic Safety and Licensing Appeal Panel BQ/07/13
23op
— 8007220503 Amended protective order permitting limited access to San
Luis Oblspo Mathers for Peace fc Bovernor of CA m security
plan info AnmndeJ affidavit of nond isc 1 OSUTB cncl
D1BHOP.C J Atomic Safety and Licensing Appeal Panel BO/07/13
BOO7230SOS Denijosfc for r econsi dsrdtion oif ASLAU BOO624 decision, ALAB-
390, or certification of M Ti-ifai>ac ft E Luco testimony on
791015 Imperial Valley eaTthquatp Urges appropiat ion of
Funds to Facilitate tostimnmj Certificate of Svc enc 1
FLEISCHAKEH.D "3, .lOHNSTQN.M P • PHILLIPS. J San Luis QBispo Mothers
For Peace BG/Q7/17 6pp
Advisos tlmt R MiMul ton rD«ponr,e to OuofUur 9 of ASL(\D-!19e
nccvr,ilnly ri>Mfict«. DSOB positi-oii Ambiguititfn In lotution oP
cnrtnqiiak!' tu-qiHii1 (CIISUT v-iti VP *• sinnplion tlint nil faults
IIJIVD ejr Lhitiiiilt' p ntcrit i rtl
MORni!3,f! II (ntet lor.Dept i>P. 0»ulnqiral Survey SO/07/W Ip
DOCKETED ITEMS
BOO73 10466 Notice a t PC Valentine '• '<
designation <aa lead counsel in pi oc
enc 1
VALENTINE,!1 C , JUNES, V I San l.ui
I Jolit-i uithdiaual *, Uf\ H .1 1 u lu 1 n
erding Lei tl f 1 Crl te af Svc
Obi spo Mothers Por Pe
Control Piuyrc
ENetLKFN, R H
flO/05'2H lp
IUPIS In Contamiriu t i or
if Itis Director
30073303:36 Motion tci change load cni
Tourtel liitte to WJ Dlmstead Hn 1 1 c. i
Buarti appearances, JR Tour t el ! ottf
of Svc end
OLMSTEAD. M J , TtHlllTCLLOTTt, J Hs
,i-l designation from JR
at UJ CHmstead '< Lt
ji thdraual fc let'tiPi tato
-Inp Branch 4 BU/O7/31
0007300110 Notn-D nf uppearanr e.' in proioedinp
LANPHER.L C California, It.itn of I ANPHER, L C
Phillipc HO/07/J1 IP
App
Mil 1 Christopher !.
BQQ729O421? Statnment in support of joint i n tprvennrB ' BOQ717 request
far reconsideration nf ALAII-39H, nr for terti f i cnti an of
question re rHhai 1 OP Trufunjc t< Enrique Independent vieus.to
CnmmiBBiQii llrpOK Funding for Trifunni t< Luco
DROWN.H H , KLINE. J A . GEORtilOU.U 3 Calif nrtii.1, Stato of
80/07/21 3pp
0007300076 Ren,uest by joint intervpnori for eitension until SOOB04 to
respond to applicant motion for luu power testing 1 iccnne
Counsel out of tniun Certlficatu of Svc oncl
FLE15CHMEF). 0 S Son Luis Qbisnu Mothurs for Peaco FLE1SCHAKEB, D S
FlBischodei . " 3 JOHNSTON, H P fer-tur fpr Law in the Public
Interoflt flO/07/25 flpp
FJ0073i0161 DiBCUBtHfii hiindling !< doll
bBtueon partios
OLM8TEAD.W J Hearing Branch 1 (IO/O7/PR
H Qeneral cot-respiindcuco
y af censitivc? security
L'pp
8007140DI/J Ack rniaipt of unrl !< inPnrma leripjnnt nliuut pt-o^reas. d
B>pHctntion of requirou1 uulturdl d hlatorit.il mi lig.iti rin
prngrtim Llr Poriunrduil to NFIC for conbl ilpr.ilion
NIELSEN. A 0 I ntor ioi . Dopt of BO/Ofa/lB IP?
8007010063 E«pruuHea roflrot thflt failuro to ndii Gocifty far Environ
AuaraiiuBn to mill ling list For uopfcly public nniiounc umontn an
faclli tij, re'iiillod in nucuBElty In duplicate lequeBt. Addition
made to distribution list
1NORAM.H U OfPite a P Poljlic AffniiB O0/0(./30 lp
BOQ701Q437 OPPOBDD granting liccnnn For 1 nui level toEtlng Par utllidue
to hn nl tli !, snfuty cnnconiB ro omurgrnry planning! rndiotion
monitoring !i aafoty InbUDis b.iBud tin TMI No tonting nhauld be
allouui) until convprslon poiiB i 6 1 1 i ti UB eiplorod
CLUCABi J A League of Uomcn Voloi-E oP Ban luis GbispaiCA E)0/Oih/24
B007070Q10 nnqunuta tliat NHC ilony OL to facility Too much Bmpha»la
placed on pnnaiblD etivthiiuakcii nlnng lloog''! Fnult Sv not
• nouoli cnncorri 1111 entlrn aroa <if inotiib i 1 1 ty (.tiniHtlona
cruotff dintinct possibility fnv Purmntion of mnrs volrnnoos
8NAPP.C Aff 11 tutinn Unknown 00/0//OI lp
8007B30377 (lunpondfl to B00609 Itr rn KM 1 eddy COIICLTIIB about pi'oilmity
of Hnagri poult to nito t< -ibilitij uf Tncility to uilthat^nd
afivero Bflrtbciuake Tfliilt it 11 1 miles From uite rtatlnr of
laiamlc aituation currantty pDndlnu bo Pure A'Jl All
DIHCK8.W J Officu of tliu fioiutlvc Diructnr fui flpBrntiona
BO/07/OH App
— 80073503B'l RotiuniitH ruspoiiBi' tn ontl HH Unddy conttirns about prtiilmitij
of u Ho Lu Hoagri Tault
UAOOHAHEiINO. 11 J Houae of llfrp , I'uroiflll APfflira BO/Ob/01 3pp
800729QAi1/ Urges that NfiC dony DLo for fniility duo to proximitij to
Hosgri fault t> io protart IIPII! th. n^tPe ty !<ujolfnre flf pHOplo
of CA
AULEN.n D AFflliiitinn Unknown B0/07-'t1l ypp
B007030017 Forutirrts IE ligllctin 80-1'), 'Pfissible Los*, of Emergency
Notification tiyb (TNg) U/Lois of DHzito Power " Written
response rBquired
ENGCLKEN.R H Region 5. S..n franti^co, Offirc of the Director
BO/06/ IB lp
DOQ72H03B5 1-oruariiE IE Insp Kepi •»()- 3/S/ FJQ II on HOO-jQl-gil No
none amp 1 isni. L> n»tud
CBEUSi J I Regiun 5. San FiahCL.ifn Hp^rior Opcrationa [Jutlear
Support Branch HU/Od/lS ^Pf
~B0072-10a9S It Insp Ficpt SO-PTti/aO-i.l nn nClOSJM HO No nontomp 1 isnce
noted Mfljoi ai oas niippi tod fire protec tion/B vevent ion,
operator tiuiniii!) *> mtnessiiitr uP tnstinjj in pi ogress
VDUNQ, I RBBIUII 5, San Franc i "en, Dffife uf the Director
BTenNBEHe, DH ntyion 5, b,m Haniisio, H^ar tor Operations Nuc 1 ear
Support liirinch 80/06/17 flpp
B007020'17'l Foriuardfi IE (iiculdi SO-lli, "I 055 of Iceactor Coolant Pump
Coolinu t, Ndturnl tirtulatlnn (onldnun ' Nil uritten responao
FNOELKGN.R II Hogion 3-
flO/06/aO lp
Franc i ',tu. OfP»cp nf the Director
B0071H03D7 Foruard5 IE firriil.ir QO-14, "Rddioae tive f ontominat ion of
Plant Deralnerril 1 1 pd Water bys f< neaultjnt Internal
Contaminatinn of Pflrsonnol ' Mo untten reBpon&e required
ENGELKtN.R H Region 5, Ian F'ratir I-SLO. OffifB of ths Diroctnr
BO/06 f3A lp
0007a30JS3 ToriuardB IE Bulletin BO 16, 'T'ntonti.il Hi supp 1 1 rati on of
RosBmount Inc Module 11BI f. llbj ProsBure Trdiiann tturs
M/Eitlinr A iir D Output Codtfi " Written re'.poiiii* required
IE Circular fJO-16 .)Ho enrl Nu uirittpn ie6pcnio required
ENGELKEN.fi H Heqion 5, S.in Tranui'n.Q, Offiie of tlie D-iroctor
BO/06/27 lp
6007300200 Responds to IE Kulletin 1)0-05 re vatuiim damage to
vol control tank •-yc All five tsnJia prolfitnd ngninnt
failure under vacuum tonili ti ons RCb drain tank designed to
withstand Ditornijl prcdsurp of IT) psig
CRANE, P A Pacifii (!as !. Flectru Co 00/07/07 2pj>
000731OJ2) FnruiarUr, IE Insp Hoptt :)J-,'7l>/HO 14 t' "-0 - 3_'3/t)D-07 on
fl0060l"SO No noncompl iancD noted
CREWfii J L Region 5. ^Jn Firfnufiro, flimctor Operation!, Nuclear
Support Uranch 00/07/10 .7p|i
—0007310127 Ifi I(iH|> Repts 10 B/5/BO-14 *, &0-3.'l3XnO O/ on fJOOAOl -^0 No
noncompl iontp niiled Mnjur flri'S! iii'-peclod iirca|]crfiti(>nal
teatino, plant tnui , fuol jto, ,ioe, o|>i<r<i tor training t
uiitneesing of tanting in pioijre-iS
VOUNO, T , BAGAQtlu.M Rf'uinn "i, ^an rrancitco. Offire of the
Dircdor bTFRNnCRfl, D M Reomn'l, Han Frantisriip [leBttur
Oparatiiins NinlEjir •iupport ]]i>ani h 80/07/01 3pp
Q Inspnction rcpurtsi IE DuUetniB * t orrosponiloncD
(3007ae061)/ roruai-dn rosponBC to 1C nullotin 79-27. "loss of Non-CIana
IE InBtrumontJilion t. Control Power !3y n Duu During
Operation " loan of poiu»r to Class IT huout, is audibly !>
Visuolly iiidirnftoi) by rontrnl rnom unnunrintor
CIIANE.P rt Pacific 0»a f. tloclrlr Co 00/04/15 I2pp
B0072401B7 RHsponds to IE BulleLin 110-04. "Annlysir, nf PUP. Main Stofl
Lini Ilreak W/Cuntinmiri r-ociiuntcr Addition " Rovleut rBBitltB
indicntB no potenliol tor lontninment ovorprouauro or
UDr»>ning of roturn to puwor rnsponne
CRANE. P A P«cil>U Uas d Einrrrlt CD 00/01/30 Bte
DOCKET 30-376 GEORGIA TECH HUSrABCH RLA(.TOI(
0 InspoLtion rnports. IE ilullelini f, i ovrecponrtcncc
B00717O11H Foruiaras IE Cifcul.ir BO-14, 'flrfil ioart ive '"ontdininati on of
Plant Doffiinifral i Ji'il IJjtcr 'njb Si nt>ci>lt.-,nt Internal
Contamination of Piiruonnpl " i>lo uiritlen rpbpimcp rpquirad
0'RElUt.YjJ P Degion J, Atlanta), UPfire op tht> Dircrtor SO/06X21
IP
DOCKETED ITEMS
007140361 Forwards input For fire protection revieiu re
water suppress um, LcmMjst i b I e control, gas suppreaBmn
doora Ji interior hnse fetation1-
HALL.R E nrookha>.ETi National Labor atui y. flO/Ofc/20
H General corretpafidence
aO0702019/ Reo.uei.ts consideration of site visit by Atomic energy
Council of Tnnuan on BOUH23-36 Counc.il interested in
observing uastp mjt activities Cooperation uii 1 1 bo major
contribution to NRC eicfieiige arrangement
LrtrLEUR. J D Assistant Director for International Cooperation
80/05/13 3pp
IQ0733QO18 Foruarila summarij
Prussia, PA le I'vbposals to
health physics staffing dr
SMITH, G H Region 1, Phi 1
Branch HO/06 'B? 3pR
of Q00(i03 meeting ujutil in. King af
meet Tuch Spec ret[u iremen t in
Fuel r.icilitu; 5. Materials Safety
— S00733QOE1 Summary of QOO(.O3 mi-eting u/util in King OF Prussia. PA r&
proposal t, to meet Tech Spec refill rempn t !. in health physics
staffing area
SEHABIAN.J rt Region 1. Ph t 1 arle I ph ifl. Office of the Director
BOVcWOS 10
0007140113 ftc k receipt of B004£U Itr re public announcement for recent
meeting at facility TEMA uill be holding public meeting
later in the year ,it uihith time public ul 1 1 have opportunity
to express VIEW* m emergency plans
QFIIMES.a K Enenjeiicy Proparednoso Progrnm Office QO/O6/09 Ip
— 800714011H Ack receipt of B00434 Itr ciprnssina concern re arrangements
For recent meeting at facility FEMrt has responsibility for
plans
ng emergency planning t, uill conduct meeting
re Flnalnefl
e
DIHCKS.W J OFficB of the Executive Director for Operations
3007230126 Deque sti partif i cut i on in study of people-related problems
in nuclear 5df t>gunr tfs Sitidi; irivpl/ci collection of data on
licensee securitij forc.es ti piditices NR>C ujish&E to interview
security mgt pcrsunnel at Ffitilitles-
EISENIHJT.D G Divis(dn aFt-icensing 3O/07/1 1 Tpp
B007110317 rtch receipt of OU DecliBr B00fl30 Itr re concerns about
emergency planning Forwards NUnEQ-Oi!i'l fe MUREQ-0396 H/o
ertcl
Fmergency Prepai odnsss Pi-oni-am Office BO/06/12 Ip
Ad i\i4 tea tor y cot respond eric o
30O70900Si ProposHd Findings of Fact !• c nut Ins ions of law reBponding to
ASLAO quBBtions an Battelle rept Findings ore- adopted by
TMI-3/Peaehbattom Intcrvenors t' Ecology Action Urges
suspension of OLs Certificate of five encl
KEPFORD.C environmental Cualiitiiin an Nuclear Power BO/OA/IB
13PP
QD07aHO5a9 Heaponils to B00530 Itr re JL & US riandell coneernB about
emurgoncij planning Discusses various optinns for Funding
nffsite support agencies Public annduncement for facility
emergency planning mooting isEuod on OO0331 W/Dondoll Itrs
DIHCKB.IJ J OffiCD af the Eiecutive Direftor For Operations
80/O7/02 7pp
I Financial inf ormnti nn
Responsp to ASLAD requBHt re DeflcientiJ 1 Urge-t reversal of
dnciiion vejecring deficiency re correlation between U mino
radon releases *< amount cif U tut 1 Portion of Perkins
decision re coirel at i nn aust ho valeted
CAPLAN.R Ecology Action DF Osdi&go f}O/Oh/2O Spp
H0070aoo48 Fropoicd flnOings oF fart entforEing Citiren-s For Bafs
Environ Filinfl re radiation seurcp terms from tl mining d
milling flojeite Pertins rationale (, urges developmpnt of
Further evidence re f.iilure mnLhrini-sms t< human factors
CrtPLftN.R Ecology Action nP nnuiogo I30/Oh/S0 4pp
£3007310243 Toruiards. CommiB-slon 000327 momoranClu™ tt orflei- containing
deciaions on U( S 7BO50a petition for recontiderfltion of
780113 memoviinthim t( ordur UC6 77UQ>1 petilrion sought nction
re firt1 protection for electrical cables
EISEHHUT. D O Division of Litcnaing BQ/QbJSV S9pp
80O7080001 Prnjiosed Finrtifiga of fatt ti cone lus ion* Of lau In Form of
memorandum 6 order aFfir/ning ASUIl 7(?0714 partial initial
decision t, ndvi^ing that radon rplcaaes ssaociated lu/U fuel
cycle are ins iom *~i cant in itriking coat/l-enof i t bfllfltiCD
BQRDENlCKiB rt Hearing Branch 4 HQ/07/O3 5Qpp
B007OI013a nesponds to B00605 Itr to 0 Cunningham transmitting iittl S-7
registration statement No inaccurotu atatements or financial
Inconsistency iilentified
CHRIETENGUHV,r Hsorino* Division QO/Oft/19 tp
P Operating lictnso stago document', t, corrBspondHnco
B00723D02i3 Summary of Bt)020/ inEBtinB u/Marli I dinners group in Detheoda.
HDi ro ravislons to NHC acceptance criteria & outstanding
issues relative to Mark I containment Sung-term program
ORIMES.C T Plant BgstcmE Uronch SO/03/H1 31pp
Advises that dates Df respDnaei) to 790937 generic ttr uore
7910S5 For Peach Dobtom 2 (. 3 & 79111"i for Hatch 1 d 2 Rapt
on VJilvp operalility prc-nra/fi r-Dt[uired only Cur plants
desiring to justify unlimited purging
VEnriELL.1.1) M Operating Reaclors Uronch 1 BO/06/09 Ip
B00717OSB1 Confirms QOO619 mg t rnootins to be held at facility re
rBgulatury pet formnnce
OF11EW.B II Region 1, Philadelphia. (JfPicn nf tho Director
BO/Oi/16 Ip
B0070SOOOa Proposed
BOHDCNICK, B. H H
ctiioni tn 300326 transcrl|it
Dranch A 00/O7/O3 2pp
a007C800Oft rtntinn to includp JG minimuB tlieorij of health effects in NfiC
B0070U FliiiJing* of fact S< toncluttona of Uu jirei&nted In
form of mtrnoranilura ;t order Inclusion Is consistent
S09,ftLAO-540 S, AUAP-S6H C«rtlficato of Svi; &HL!
BnRDEHlC,l< Heai-iiio Dran. h a aO/O7/03 7pp
tlrder 191 anting Ecology Action pF OaiiTEgo motion to file
B00630 aubmiB'.mn ro generic radon is-auo
BISHOP, t .1 Atunii. Safoty and Liconilng Apsea! Panel 80/07/07
3007310123 HesponsD in Bupporf of MlfC EJ00703 oleading annorting
validity nf Perkins T ecord on radon releases Prom U mining
t< milling Objeitt tn MRC j.nsition uliminatihg health effocts
isBues from ron',iderabion Supporting neuis articles one J
CAPLAN.F1 Erology Action Df DBIUBJO 80/O7/|fa |3pp
0007250353 Koruards reviseil Pages 7 t, Id to HcpnseflB. reply to proposed
findings of fait submitted by otintr partic* piled B0071B
Revised pagen rpquirod lq corrpcl, typographical errors
Svc list encJ
TflftVlESB-DIAZ thata- Pittnan. Potts I. TroEDDMdge 90/07/31 lOpp
B0070EOB10 ftdvisns that Class Ul FBD is roqulrpd for rc-vioiu of 000603
application f»i annntt of UiccnbCG DPR-44 t< DPIl~5/t Requast
involvDQ redietriliution of honlth physics Functions (, la
conslduruil to be <it eafotij sign i f icanc D
DIOGS.K H Licunsf Tee ManagcniBnt Branch BO/06/1B Ip
00071001SD Requests technical a^&istanco for review of B00923 b 0603
proposed Tocli fippc ctionges re executive mgt & onalto health
phijaUs funcHims Current Tech Space (• util Itrs encl
NOV/lKi T Assistant Director fi>r OpRrating Reactors BO/06/19 ip
— D007100J!ia Current Tech fipeea Pagoa 243 through H4A ro administrative
c ontrols
-• PhilauBlphia Eloctrlt Co 79/09/30 App
H007D20430 Confirms liteneee voluntary cooperation in/team af NRC
rosearcli contrac lurs during visit to Facility In Sept 19BO
Visit IK related tu HOC apniisofed Gtudu TV status monitoring
of engineered sinFuty features
REID.FI W Operating RsactorE ISranch 1 SO/Oii/ai Spp
QQ071R0119 flequests that util propose: amends to Facility Toed Specs to
incorporate currently installed sctimic Inntrumentation t<
aieoclnted sur viM 1 1 ance requirements (Sample Tuch Specs
reflecting rurrent NRC tuquiroments oncl
NOVAK. T M A»Hi»tnnt Director for Operating Reactors BO/07/01
— BQO718O123 Sample Tech Specs Pages 3M 3-46 through 3/4 3-48 for
seismic monitoring instrumentation
* General Electric Co 7B/O4/OI 3pp
80072BO342 Advises of personnel change
of Ofc of Nuclear fieflctor Regulation
NOVAKiT M Assistant Director for Licensing
suiting Prom reorgani cats an
BO/07/10 Hpp
B007240238 Forwards Amends 71 t. 69 to Licenses DPR-14 t< DPR-Si.
respectively, safety !< evaluation ti notice of issuance !,
availability
REID.fl W Operating Reactors Branch 4 BO/07/13 Epp
— B007S4O242 Amends 71 t< 69 to Licen&BB DPFI-44 t. DPR-56, rasp actively,
clarifying definition of operable & adding general
limiting conditions for operation 5c action statements for
Ttch Upecs
REID.R W Oporating Reactors Branch 4 BO/07/1S 30pp
— 000724034*7 Safety evaluation supporting Amends 71 Ii 69 to Licensee
DPR-14 b DPH-56. respectively
* Office of Nuclear Reactor Regulation. Dime tar BQ/O7/13 3pp
— 3007240251 Notice of issuance fc nva i Inb 1 1 Ity of Amends 71 t 61? to
Licenses DPR-44 fc DPR-86 respectively
REID.R H Operating Reactoro Branch 4 BO/Q7/IB 2pp
8007180443 Forward* application for amend of facility QLs Application
rt quests changes to Tuch Specs re control rod drive return
line mods, containment isolation valve mods & correction of
typographical error Chech oncl to cover fee for application
BRADLEY. E J Pit i ladolphlfl Electric Co 00/07/16 Ip
— Q00718044& Application far amend of Padlitij OIL. requtsti ng that Tpch
Bpeci in App A of 01. be amended hy revisino control rorf
drive return mods, containment Isolation valve* E<
typographical error in Tocli Qpncn Cortificlite of Svc end
KEMPER.J B Philadelphia Electric Co BO/07/16 IQpp
B007K20391 Forwardo addl fro for application for a mo nil to Llcentes
DPR-14 & DPR-Sfti in response to B0061Q Itr
BRADLEYiC J Philadelphia Electric Co BO/07/17 Spp
B00701037H Responds to IE Bulletin 77-14, "Snsmic Analysis for
As-Duilt Safety-Related Piping Syi " Bechtel Poiuer Corp Is
performing engineering review >< analyses For safety-related
piping Unit 3 rept ui 1 1 be • iibmi tted by HO061S
DALTROFh.S L Philadelphia Electric Cti BO/06/03 Ip
B007S106OO Foruards IE Info Notice BO-3S.. "Evaluation of Contractor
Oft Programs " No urlttsn response required
GniER.B H Region I, Philadelphia. Office of the Director
BO/D6/1O lo
3007020073 Responds to IE Bulletin BO-Oi. 'TnQineereit SflFety Featura-s
(ESF) Reset Controls " End App A iCantifies any torrective
action planned for saPety-related enuipnierit uhich does not
remain in cmergeitct; made opur. reset of signal
DALTHOFF,B L Philadelphia Elpctrir Co BO/06/11 Hpp
BOO7140267 ForiuardB IE Bulletin BO- It, "Dogrddatian of BUR Scram
Discharge Vol Capnbility " Uritlvn response I equired
finitR.D H Region 1, Phi lailelphia. Office of the Director
HO/06/ 13 Ip
BO0718010fa Submits rapla to IE Bulletin Bu-13 re cracking in core spray
Hjirager* No cracks ucre found in insp at Unit 3 Insp of Unit
3 ui 1 1 be performed during neit refueling outage
DALTRDFF, B L Philadelphia Electrir Co BO/Oi/13 2pp
B0071Q0117 Submits reply to IE Bullstin 79-34 re seismic analysis for
as-built safety-relate!! piping sys All Unit 3 saf etj-related
piping is operable in present condition
DALTROFFrS L Philadelphia electric Co 00/06/13 3pp
EJOO717O507 Updates B00415 environ qualification rept for Class IE
electrical equipment in responie to IE Bulletin 79-01B
Forwards revised pages t info IB h>gh energy/one break
profiles fc LQCA profiles for reactor blags W/o enc 1 s
DALTROFF.S L Philadelphia Eloctrkc Co BO/06/17 2pp
BO»70H0703 Forwards IE Bulletin BO-ID, "PusuidlE Loss oF Emergenci|
notification Bijb (ENS) M/Loss of Offsitu Pouier " Written
response required
OR1ER.B H Region 1, Pli iladelphla. Office of tha Director
BO/06/ IB Ip
Q Inspection reports* IE Bulletin!! 8. correspondence
000714046B Parujards IE Bulletin BO-13. "CrnchinB in Core Bpray
Spargers " Written response required
ORIER.B H Region 1. Philadelphia. Office of the Director
BO/OB/ 13 Ip
8007020033 Ac k rocolpt of 000013 Itr informing NRC of step* taken to
correct violations noted in 1C Insp (lopts 30-277/BQ-O6 fc
30-370/00-06
DRUNNER.E J Region 1. Philadelphia, Reactor Operations Nuclear
Support Branch BO/09/HB Ip
--B007020041 Responds to NRC (100421 Itr rv vlolntlc-ni no tod in 1C Insp
Repts 30-377/00-0;) t, !H)-H70/HO-0(> Corrective fldlotis,
personnel reminded nf work documentation importance fc Tech
Bpecs data rncordod
OALLAOHER.J W Pll i Indulph In Elnctric Co OO/OS/13 3p(h
--8007020041? Forwards IE Insp Hopts 30-277/BO-06 ti 30-27B/OO-06 on
B00317-21 ft noticu of violation
DRUNNER,r J Rcglun I. Philadelphia. Reactor Operations Nuclear
Support Branch, 90/04/31 3pp
—9007030060 Notice of violation from in»p on "OOaiV-ai
a Real on 1. Phlladolphln. Offlcu of the Diroctar QO/OI/'lt) Bpp
— B007020070 1C Insp RBpttt 00-277/BO-O/i (< 30-H7D/QO-06 on 000317-21
Nancampllance natvd utll failed to document tuio survol 1 Untu
tssts b corrective molnl t< foiled to record Tecli Spec* dat*
BLUrtMBC(lQ,N Region 1. Pliiladelphla. Office of tlm Okrvccar
OREENMrtN. E 0 Region 1. Phi Udnlphla, Reactar Operation* Nucluar
Support Dranch 00/04/1(1 iBpp
B007020143 Forwards IE Info Notice BQ-S3, "Di'vakiltiiiini In Contomlnntl on
Control Programs," No written reapnnsB required
OfUERiD H Renlan 1. Philadelphia, Office of tin Director
80/Q9/2G Ip
6007010310 Forwards IE Info Notice PO-HD, "Loss of Suction to Emuroency
Fteduater Pumps " No uirittnn roBponnc mquirttd
CRIER iB H Region 1. Philadelphia. Of Pico of the Director
SO/03/29 Ip
t!00702019^ ToruordB IE Circular flO-15, "Los^a of Reactor Coolant Pump
Cooling (i Natural Circulation Cooldoun " Nn written rospunee
ruqui red
ORIEff.D H Region 1, Philadelphia. Dffice of the Director
QO/06/2D Ip
B007160Q36 Foruarus IE { Irculnr BO-11, "Radioactive Contamination of
Plant Domlnoralliod Hater Hys ti Resultant internal
Contamino tion nf Personnel " No written response required
IE Region 1. Philadelphia Office of the Director
Ip
UOQ7210aaB Toruards IE Info Notice BO-2-1. "!.DUI Level Radmaato
Criteria " No uirltton response required
DRIER, B H Region 1. Philadelphia. Office of the Director
90/06/S5 Ip
tJ007aiQ061 Forwards IE Infip Hept 30 S77/BO-17 on B00ft04-05 No
noncomp 1 i ance noted
Crtm.BDN.tt T Flegion I. Ph i lailelpli la. FlBnctor Construction !.
Ctiginepring Support Dr.lncli 60/06/56 2pp
~B0073IO(H»a IE Insp Rept 50-27//BO-17 on BU060fl -05 No riDltcotnpl lance
notoil Major areas Inapectnd MSIV pneumatic ranrrol manifolds
E< ma i nit earn t< feeiluater sys
FINHEL, ft , BASBANI.A Region 1, Philadelphia. Office of the
Director EDNETER. 8 D Region I, Philadelphia. Reactor
Construction t< Engineering Support Branch BO/06/1S 5pp
foruardi IE Bulletin BO-I&. "Potential Misapplication of
Rosemount Inc Models 1151 d USE Pressure Transrni ttora
M/Either ft or D Output Codes " Uritten respanne ronulred
IE Circular HO-ld also encl No written response ronosrftd
OniER.D H fiegion 1. Philadelphia. Office of the Director
eo/0/./a? 5ft
HOO7830A31 Reaponils to IE Bulletin BO-OB. "Examination of Containment
Liner Penetration Wolds " Each unit has 3i fined hi' a if
penetrations lu/totol nf 40 containment boundary butt upldn
between penetration sleeve & process piping
DALTRfl-FF. 9 L Phi lanelphia Electric Co BO/06/30 13pp
B00723071ft /ick receipt of 80051.2 Itr informing NHC of ateos taken to
correct violations nutei) in IE Insp Hopts 50-277/79-3O t,
SO~S7B/7?-33
OnlER.B H Reoion I. Philadelphia. Office of the Director
BO/07/01 Ip
DOCKETED ITEMS
r21Q!rl3 Hi)5|>i>nU5 ID HKC HOQ12I Itr TP violations notoet in IE li
..pt-i -iO-S7//,"*-,jQ ft 50-27(1/7';- Jj forroLlivp .actions
-cturnn cmulm. led u/p or am, no 1 If pr UL pd ur P Tor diita sheet
.•vi 5 Pel
AlLAOHtR. ' W Philadelphia Eletti Ic Cu SO/Ob/12 5p[i
7JJ(iriO Tiiruj.irdi Ifc Insp Repta "50- .277/79- 1O I, SO-2/0/79-3T on
91H01-H !< notice of viu liition. App s rt '< D
[«fflML»,F J Region 1. P|» t lodol pli i a. lleactor Operations NucUa'
uppnrt llT.iiii ^ RO/O4/H1 3pp
— BO0731042O "Radiological flegianal Environ Monitoring Program Rept 15,
1979 "
» Radiation Management Corp OO/OS/ai 1 lOpp
BOO? 1804 1*7 Forwards monthly operating TPpts for June 1930
COONEY.M J Philadelphia Electric Co 6Q/O7/1O tp
— BQO71D0433 Monthly operating repti. for June 1980
ALDEN.W M Philadelphia Electric Co BO/Q7/1O 9pp
7?T()/:U Notice af vi olot i on. A|i p A, frnm insp on 7[M301-ai
Hi- 5 I on b Philadelphia, Office n f the nirettiir HO/04/16 lp
73,10/31 tlnLire of v i ola t \ on. /W U- from in>=p on 791201-31 Portions
ithheld Iref 1 GfFna 790 )
Region I. Ph l lail e 1 phla, Office of the Director (tO/O4/16 Ip
Flepor tad lo occurrer
LET a & related
arr espondence
IE In* p. neptn 80-2/7/77- :iO J. 50-a^O/79-D.l on 791201-31
loncompl l.tiicu nnLod failure to follow radiation protection
Buiil rumen ts >< to record rodctnr wit or c h 1 or i il e data
icurateli] ['ortioni wnthJiold (ret IOCIR2 7901
IREENMAN. T Q , flLOUGII, A I! Wpglon I, Ph 1 Inrie 1 pd ia, Clffico nf the
irtctpr MrCAllC.E C Region 1, PMIaiJt'lph ifl. Hcflctor Operatloiifl
luclwar Eupport Hrsnch BOJO^/lti lOpp
101V7 Act roc&I[.t of OOOSO1? Itr lnf=i)rnii ng NRC uF step's taken to
rscb violations noted in IE lT>ap IlirptB DO-377/77-09 !i
eaion I, PhtUdnlphln. Office oF tti o Director
721O31EJ HosponilG to NHC BDC"H6 Hr ru vinlatlona !> deviation
otocl in [K Insp Rep to 30-37 ) /79-Q9 J. 50-37E]/77-tO
orrertjvu (sitl-ons meet ing i. hali) cm eaeti shift to inform
iptprntora nT plant ttntun t amj unuiun] plant conditions
AUTUOM . I! I. PliiUifolphi.i Lloctrlc (,o
A Fononr^s IF Innp Repta OU -U77/ /'J--09 t. OO-a/n/79-IO on
:!0 fc notiren oF violation t. deviation
RICH, 11 H Kegnin 1, Ph i luJo 1 phin. Off! l o of thu> Hlrectcr
10 Motue nf violation frum inB|i n
ion 1. Phi ladolphlo, Dffiro of the Diruttor
aDD7Oa031t no on BOO32?, RHR motor Palled Caused by failure gf lower
goida bearing Ins true tions issued to operate RHR ays at full
lieu conditions Fans nn motor shaft ends being replaced
Failed motor replaced uj/neui motor
CQDNEV. M J Philadelphia Electric Co 80/06/30 Sff
BQ072104D3 RO-H-SO-I 1/1 P nn B00714, diesel QenerstDr cardoi BUB vapor
pilot valve mas found closed Caused tij failure to properly
clear aaPotij pormit on BOO730 Vapor pllct valve locked open
ULLRICH. W T Philadelphia Electric Go 80/07/15 2pp
0007230617 RD 2-BO-12/IP on B00721 , wh i 1 c testing Unit S during
refueling outage, scram backup valves in air supply to
control rod drive scram valves* failed Caused bij design
error Manual venting provided
ULLRICH, W T Philadelphia Electric CD BO/07/22 3pp
BOO7300275 Discusses deficiency reported 800731 re Installed solenoid!
of backup scram valves tta Immediate licenoina or enforcement
action required Deficiency should be corrected as soon ac
posslb 1 e
EIHENHUT.D O Division of Licensing BO/O7/'22 Bpp
DOCKST 30-270 PEACH BOTTOM ATOMIC POWER STATION, UNIT 3
F fiBeurity. medical, emergencij tt fire protection plans
(3007140361 Forwards iuput for Fire (protection review re fire detection!
water auppresBlon^combustiblo control. gas suppress! on- fire
doors tc interior hose stations
HA1_L,H E Oroukhavan National Laboi-atorij BO/OA/30 Bpp
J7510J.I5 NdticD of deviation frrim IrtRp on
[fwuioii 1. Ph i ladelphle, DfPlco at the Onoctii
• /SHIJ07 [I- In»p> nepts 30- H77/71? -O1? h St)-a/fJ/ tt-lQ on 7"031V-30
onciimpl ioiicn nntei) ('Mllnrc lo jirovirto mJoquula rotrnlning
rogrnm Fur mini icentad por5tjjin») 6 failure to iierform flA
IUNTFH.I) II - MARTIN,! T
ifplte up tbe Plr-octor
OnOl IAFJDC), T I Hoginn 1. Philadelphia.
71pp
'10B47 Flofl|ionilv to 1C Duimtin BO II Mntjonrij walls In prmlmitu to
hiving a t tfithmontfi Prnm frofuty-rolfl tocl piping t< equipniDiil
ntiPini) in App A Juitl f 1 tdtifln Pnr re-ova luo 1 1 nn criterln
I t-i< pubmitl'xf within 1E)I> dnija Arfll>uvlt oriel
TliOfFill L Phllndolphiifi LTlDctric Co £10/07/01! lOpp
RflDpondi to IE Dullotin BO-1O ro conldmlnnt ion <if
il-nil toni ti vo <v» !i rosulllng putuntl.il for unmonilorod.
ontrolled relfliiu* of rad loor livi tij to environ Moil
igrrtm Itiil-iatL-d for lt»l«il lefentifni) njs
1 [>hiladelp>itfl Elpctric Co BO/07/02 !)pfl
'40430 Confirm* orol not i f Uii tiiin that EO-Jay [luriod for completing
tt ron.uir»d lit Item 2 at IF nirllulln blO-17 utorted
)70fl NflC ItrcdMng projott; mimfliror should liu notifiod if
t uiuulO cfiu*i> fcuvurii impact nn. pouftr reliability
O>I3 M Rttglttti I. PNn«delphln. OfficD oP Kit Diroctor
0//09 2pp
JPOS60 Riiit«i»*ti, intension unlil QODDO? tor nutsje to perform acrom
ti on Unit n.roiuired by 1G Dullwtin BO-17, 'TaUurn of
flf IBS Cnntiol Rods tu rulltj Iimevt During fit ram at BUR "
.UrtOHER.j W Philfldfflphiii Eleetrit Co DO/07/H3 Spp
(I'lodic c-por*Hno ruB
tud EnrreHpondence
310111 Forwards "Enviroiii Raillatlnn Mcml loring Prournmi 197"?
Jiologlcftl Dojlonal Environ Monitoring PTOgram Oupt 13,
'<> .1
ABBV.M B Plii Jodfllphlfl Lilertl-U Co HO/07/OH lp
17310417 "Environs Radiation tlonitorlno ProBrnm, 1979 "
Intern Cflrp 00/05/31 102pp
0007230010 Forwarifs summary oP HOOiOS meefcin!) u/otil in Kino of
Prussia, PA re proposals to meet Tech Spec raqoirement in
health phijslcG staffing area
SMITH.O H Region 1< Philadelphia, Fuel Facility (. Matorials Safety
Bronch HO/Ofiya? 3pp
— BQ07a300ai Summanj of BOO6O3 meeting ni/util in King of Prussia, PA re
proposals, to meet Tech Epnc requirementE in health phgsie*
Btaffinfl area
sen/iDIAN, J i\ Region 1. Philadelphia, Office of the Director
PO/06/03 lp
8007230126 Requests participation in study of people-related problems
In nuclear [safeguards Btodij involves collection of data on
licensee -security forces &• praclices NRC wishes to interview
security not personnel at facilities
EIBENHUT.D 3 Division of Licencing aO/O7/ll 2pp
0 Adjudicotoi-y cnrrespondence
£3007090096 Proponed findings of fact t> conclusions of Uui respondina ti
ABLrtD quevtions on Battolle rppt Findings are adopted bv
TMI-E/Peachbottom Intervenor* & Ecology Action Urges
fluspennlon at DLs CertificBte of Svc enc 1
KEPFOflD,C Environmental Coalition on NucJuar Ppuer BO/Oi/10
12PP
B0070B0016 Response to A3LAB request re Deficiency. 1 Urges reversal of
iloclsion rojnctlna deflcianci) re correlation betueen U mine
radon releases & amount of U fuel Portion of PerVin*
decision re correlation must be vacated,
CAPLAN.R EcolOflU flclion of Dau»go SO/06/30 2pp
BQ070H<XHB Proposed flndlnoo of fact endorsing Citlient for Safe
Environ filing re radiation source term* from U mining fc
milling Rejects Perkins rationale t, urges development of
further BVldence re failure mechanisms * human factors
CAPLAN.n Ecology Attion, of Onuego BO/OA/20 4pp
8007310213 Forwards Commission BQO9S7 memorandum *, order containing
decisions on UCS 7BtnH>S petition for r-econslderation °t
7B0413 ntttixflT*ndu>i *. order UCB 77U04 petition sought action
r« fira prDtaction fc-r elec trical cableo
EIEENHUT.DO Division of Licensing SO/O6/23 B9pp
DOCKETED ITEMS
80070BO001 Proposed findings oF Fact !< conclusions of law in •
memorandum & ardor affirming ASLQ 700714 partial initial
decision d advising that radon releases associated u/U Fuel
cycle are Insignificant in striking coat/benefit balance
BORDENICK. G M Hearing Branch 1 BO/07/03 SBpp
9007170^91 ConfiTme
regulatory ;ier f nr
CRIER, D H Real o
QO/Ofc/16 lp
g I
'ting to bv tie id .it fni 1 1 1 ty in
1 1 a, tll"Fitf of the IMrcitni
— BOO7OB0003 Proposed corrections to 500226 transcript
BDRDCNICK.D H Hearing Branch 4 BO/O7/O3 2pp
— BOO70BOOOQ Notion to Include He minimus theory of health effects in WRC
800703 findings of foci l< conclusions nf law prenEntoid in
form of memorandum d order Inclusion Is consistent WALAD-
309, ftLAB-340 I. ALAB-3&2 Certificate nf Bvc one 1
HdFtDENIC.K Hearing Brancli A 60/07/03 7pp
8007100258 Order granting Ecology Action of OsUBgo motion to file
B0062O submission re generic roifon issue
BISHOP. C J Atomic Safety and Licensing Appeal Panel BO/O7/O7
BO0703OSIO Adviops that Class III f»c ii required For fcvieiu 11 F HOOil
application fur amond of I licnscs DI'H-41 ti DPH-bA Fiuqucst
involvps r eat s trib u (.ton of health phijsit* Functions Ji 13
consul L-red to be nf safe-tg 1. 1 311 1 f itiinc e
DIQG3.R M License Fee Management llr.mcfc flO/OJ.yiil Ip
BOQ71OO155 Requests I ot Im i La I a-,s i it mir B f*ii ruwitiui of 800523 !• Vt,Qrl
proposed Te-rl> "5[iet changus re eit-cutivu mgL t< oit^iLe fioalth
pJiij5iC5 funttinna ( urrent Tech Spot* 'j ittil Itrs ent 1
. T Assistant DirtFclnf fur npprating H*,jetOT* fiO/Od/l'J |.
— BO0710O15B C
through S
BQ0731012B Response in support of NRC HOOyOT pleading asserting
validity of Perkins rocord on radon releases from U mining
& milling Objects to NRC position eliminating health effects
Issues from consideration Supporting news articles end
CAPLAN, ft Ecology Action of Dsuiogo BO/07/16 13pp
a00717CO5fl OutliniPE NI1C unifcr st^nd i ng of status of use of hafnium tc
control rorf bladus Amend 7fl to l-itcnse DPft-flfl iiutH or i i nd
use Utll u-ith-drpu 790^31 refluent fcillauing amend itsUtincp
REID. It w Cloeraling Roaclurs lirancli •! HO/O6/!J'i 3pp
B0073503S3 Forwards revised Pages 7 fc It to liconsees reply to proposed
findings of fact submitted by other parties filed BOO71B
Revised pages rtq.uired to correct typographical errors
Eve list end
TRAVIE80-DIAZ Shaiu. Pittman. Potts b Trouibrirtge BO/O7/21 lOpp
8Q071BO11V DequBBts that util prupo(,n timem<J& tu Fnt 1 1 1 tij Tech
incorporate currently inslalled sol^mlc instTiirnniitatlnn !.
ossociateu siir vHi I lam ff requirunicnt B Hamplc le-c.li SI>UCB
reFIecting current MFIC rctiu 1 ri'inonts tnc 1
KOUAK. T M rtasiatarit Director for Dperdt-ing Rom tors
H Oenoral corraspondence
8007020197 Requests consideration of site visit by Atomic energy
Council nf Taiwan on 000835-26 Council interested in
observing waste mgt activities. Cooperation will ho major
contribution to. NRC exchange arrangement
LAFLEUR.J D Assistant Director for International Cooperation
BO/O3/13 3pp
BOQ71BOJ23 SnmplD Teih Sp*ca I'.iflfs
seismic mnni tnnng in^trifmentatim
• Genera] Electric Cn 711/CA/Ol
'~S -Hh through 0
8007280342 Advised oP porsonnrl clirfngci rps^iiltlng Prom Toorgdni i
oF Ofc of Nucle.TT ReorLor Regulation
NOVAK, T M Assistant Dirnctd)' fur Licpnsing HO/07/10 Sy p
B007140119 Ack receipt of B00433 1 tr re public announcoment for recent
mBHting at facility FEMA mill be holding pu&lic meeting
later in the year at which time public will liave opportuni ty
to eipress visas re emevflency plans
CHIMES, B K Emergency Preparedness Program Office 8O/06/O9 lp
--BQ07140118 rtck reeBipt of 800124 1 tr expressing concern ro arrangements
for recent meeting at facility FEMA has responsibi li tij for
assessing emergencu planning & will conduct meeting uihen
plans are finalized
DIRCKS.U J Office of the Eiecutivo Director for Operatinns
00/06/02 Syp
B007110517 Ack receipt op OL Becker BOM30 1 tr re concBrr-s about
flmernencv planning Forwards NUREO-0651 !i NUF1EQ-0396 H/o
nncl
OniMES, D Einergoncy Prnparodness Program Office BO/0(b/ia lp
B007SB0319 Responds to B00520 Hr re JL t, US Randell concerns about
emergency planning Discusses various options Cor funding
oPfsltn support agencies Public announcement for facility
emergency planning meeting issued on BQ0331 W/Handell Itra
DIRCHBiU J Office of the Ciocutive Director for Qperatione
00/07/02 7pp
I Financial Information
BOO701013B Responds to BOOtOS Itr to 0 Cunningham IranBml tting util B-7
registration statement No inaccurate slatomsntE or- financial
incDnsintency identified
CHRiaTENBURY-E Hearings Division QO/Ofo/19 lp
P Operating license stage doc uirients (i correspondence
B0072300BB Summary of 000307 meeting u/Mark 1 owners gToup In Rethesda.
MD.re revisions to NRC acceptance criteria I. outstHndtng
isauuB relative to Mark 1 cont.i tnment long-term program
ORIME9.C T Plant Systems Brand. BO/02/31 31pp
B007H0641 Advises that dates op rnsponBes to 770927 generic 1 br DBTO
79102S Cor Peach [iottom H !i 3 I, 791115 for Hutch 1 *r S Rept
on valve operability progrnm tnnuired only For plants
il»Birlng to justify unlimited purging
VERRCI.L.1. D M Operating Reactors Branch 4 80/06/03 lp
8u07S4Q33f) Foruirds Amends 7l !, A'? to LICBHEBS DPR-44 !. DF'R-&(.,
ro3pectivelij, s-jfctij I, evjluution !, notlcv of ianMJinco !i
ava liability
REID, n W Opwrating [leiicli.rs Ur,ini,h 1 00/07/15 Epp
rtmentls fl >t ii1) to license*. DI'R-'lfl t, Dt'ft -'li, roGpoc tl ve 1 y,
clarifying doflnktion of appraHe d .nl J ing gptti-ral
limiting ciHirii t i dnE For opeTuli on '( -ictlon fctatpmsntt for
TecA Spffcs
REID.R W Operating Reactors [itanth 4 HO/O7/15 SOp?
71 t< 47 tu Llcunico*
13
O2^g Safety evaluation nupror ting Am
DPR-4fl ft BPR-56. rcapBttivoly
« OPflCB oP Nuclear Reactor Rp<jula 1 1 on, Director
60072^0351 Nntlte of iBBuance f< avatlability a* Arnendr, /j t, (,1 to
LicenaPH DPO-44. !. Dffl-&fa reinettivcly
W Operating Heaclois "i ancli 4 00/0//1!! ypp
DO071S0443 Forwards nppl icatlnn Tar amend Of PncilUy OLs ApplUntiO
requeBta chivnges to Toch GpfCi re control i otl drive rofcui n
line raodai co-ntiiininnnt isnlatiiin v.iilvu mods !. loiroction of
typugrjiphicnl error Chn-ck encl to cci\er FBI* For npplicntlon
DRADUEY, C J PlitLiilalpliie Eloctnc to UO/07/ I b lp
Application Por jmono ut- ffinliti) I1L, reijuoat inij tiiat T;
QPBCB in App A uf Ou be anwritlod tiy ravumn unntrol rid
drive return moil p , uuntairimprit iiolfllion valvna (,
typographical error in Totti £!pucs (crtificatfr of Svc encl
TEMPER, J B PhilaOclptita Cloctrlr Co (IOXO//1A IBpp
B0072g03fl1 Forwards
to fech Specs
£ j PluJ
i cat i an to .inn-nd UL t< propnvtU tnmporjirij
pllie Cl»«tr>»c fu HO/07/3? lp
—BOQ-JSBQ3HO Applic-ition to omenfl License DPR-56, author J ilnfl t
change to Tech Sp-ocs uhi<li would Jllou rPlinP -from
rimiiiremimt to rumave unit from tvt if lnoperotil& sntibbor
cannot be repfiirud uithin VJ-h CcrtificntB of Bvr ent |
, J S Pbi!agt«lphta iHlfCtric Cu nO/07X!O djip
— ao07SBOa9t) Proposed temporary change to forh Spun For anubbwrs
safalij-rolatBcl &IJB. dl lowing roliuf from r«qutf«imffiit to
remove unit fjon avc if inonorabJe minbliftr cannot b*
repaired ujitliin 7H-h
« Phi Inai-lphifl tilBrtric Co SQJQf/SS Bpn
B00730O553 Confirms NFI( 800717 oral author i i<jt i on to tBmp aran ly amend
Tech Spec 3 II D2 <han.ge allow* innpersb 1 1 i ty of snubber
10-03-5-14 For 10 daijs to pi-rmit repair Formal amend, 5.1 fety
evaluation !< noticu u i 1 1 be- forwarded
NOVAK. T M Assistant Director for Operating float tors BO/0//BS
2pp
Inspection repui ta. TE Bulletin'1, J, correspondent (
B00711O462 Forwards IE Dulletir. 80-13 "Ct
Spargers " Written response required
ORIERxDH Region 1, Philatlelpnia. Qrfi
BO/03/13 Ip
r li Ing In Cora Spray
- of the Director
B007020035 Ac h roreipt of BOO", l 3 Itr informing NRC of steps take* to
correct violations noted in IE Insp Repts 'iO-277/BO-Oi. ",
50-279/00-06
BRUNNEfi.E J Region l, Phi 1 adt Iph la.
Support Dranrn 00/05/38 Ip
fieat tor Operations Nuclear
— 8007020011 Respond* Co NRC HtHMBl Itr re violations noted in IE Insp
Repts SO-277/BO-O*. f, 50-27 B/80'06 Corrective actJOTia
personnel reminded of uorli documentali on impnr t.nnr e & Tech
Specs data i ecorded
OftLLAQHDJ.J II Philadelphia Electric Co BO/O5/13 3pp
— B007020049 Foruardi IE tnap ffepts 50-277XBO-0*. '. 30-278/80-06 on
B00317-2I t, notice of violation
HHUNNER.E J Region 1. Philadelphia, Reactor Operations Nuclear
Support Branch BO/04/21 3pp
— 0007020060- Notice of violation from insp on 000317-21
" Region 1, Ph i ladnlph is, Office of the Director no/O4/19 Zpp
— B007O20070 IE Insp Repts 50-277/BO-Od t- tO-27fl/BQ-Oft on B00317-21
None ompl iance noted util failed to document tuio curvei 1 lance
tests (, corrertive malnl t, failed to record Tech Specs data
uLUMMUERQ.rj Region I, Philadelphia, Office of the Director
GREENMAN, E 0 Region I. Philadelphia. Ftpactor Operations Nuclear
Support Branch BO/04/1S 12pp
B00702O7O3 Forwards 1C Bulletin SO-15, "Possible Loss of Emergency
Notif Italian Sy 5 (CMS) H/Lass oF Qffsite fouler " Written
reapoti-se required
BRIER, D H Region I, Philadelphia, nffiCB of thu Director
BD/Oi/ia Ip
BOO702Q4^2 Foriuards IE Circular HO-13, "LOEB of Reactor Coolant Pump
Cooling & Natural Circulation CDdldaum " No mritten response
required
ORIER.U H Reoion 1, Philadelphia. Office of the Director
BO/06/ 20 Ip
B00716QB36 ForuiardB IE Circular aO-!4i "Radioactive ContaminBtlon of
Plant Demlnerali led Uater 9ys t. Roiultant Internal
Contamination of Personnel " No uritton respon'e required
BRIER. D H Renlon 1, Philadelphia, Office of the Director
BO/OA/24 Ip
800721032B F-oruards IE Info Nnticc tlO-34, "Loiu Level fladuante Durial
Criteria " No written roapontte required
OrtlER.B H floflion 1, Phi l«idel ph i a, Office of the Director
BO/Oi/35 Ip
B00723Q163 Formarda IE Bulletin GO-16, "Potential Misapplication of
RoHomuunt Inc Models 1131 & 1 1 5H Pressure Trantmi ttem
W/Either rt or D Output Codes " Written responae required
IE Circular 60-16 also enc 1 Nti written response rBquired
OniER.D H Region 1, Philadelphia, Office of too Director
BO/06/27 Spp
B007230631 FieEpnnd'i to IE Dulletin BO-OB. "Eiami nation of Containment
Liner Penetration Wolds " Lacli unit has Sb FluBd head
penetrations u/ total of 40 toiitainmcnt boundary butt luelda
bntueen punetratton sleeve t< procaEE piping
DflLTROFF.B. L Philadelphia Electric Co BO/Oo/30 13pp
B007S307it Ack receipt of BQ0513 Itr Informing NRC of ttepa tuVvn to
corre-ct violations notad In IE Imp Ropts 50-377/79-30 &
50-27B/79-33
DRIER, B H Region 1, Philadelphia. QPfice of the Director
BO/07/01 Ip
B007020143 Forwards IK Info Notice HO-22- "Breafcouuns In Contamination
Control Progi-acns " Nu uritfeii respon&e required
BRIER, n H Region 1. Ph 1 1 .irtelphia, Office at the Director
80/03/28 In
B007010310 Forwards IE Info Notice BO-33. "Loss of Suction to Emergency
Feedwater Pumps " Nn •uintten response required
CRIED, D H Region 1, Philadelphia, Office of thp Director
90/05/29 Ip
B0070J037B Responds, to IE Bulletin 79-14, "<3f>ismlc 'Analysis for
As-Duilt BafEtij'Rcldted Piping Sijs. " Qe-chtel Pouer Corp is
performing eng incur lno. revieu ', analyse!. For safety-related
piping Unit 3 rep r will be submitted by QOOA13
DALTJtQFF.S L
_ . by QOOA19
Philadelphia Electric Co BO/06/03 Ip
8007310600 Forwards IE Info Notice 80-36, "Evaluation of Contractor
OA Programs " No wrltton response required
ORIEIi.u H Roy ion I, Philadelphia. Office of the Director
BO/06/10 Ip
B00702007H flosponda to IE Bulletin RO-Oi, "finoine^rofl Bafetu Featuret
(ESF) Reset Controls " Gnc I App A identifies any corrective
action planned for saf ety-t-p l oted equipment uhith does not
remain in emergrncy mode ufton reset tif aigral
OflLTROFF.G L Philedel ph la Elpcti-ic Co HO/Ot/H 9pp
B007140267 Forwards IE Bulletin t50-M. "Dearadati on of BUR Bcrnm
Discharge Vol Capability " WTitteii responBe require!!
QRIER.G H Region i, Phi tod e Iphia, Office oP the Director
90/06/13 Ip
—8007330732 Responds to NRC B0012 1 atr re violations noted in IE ln«p
Repts 50-a77/7'7-30 !. SO-S78X7'?-33 Correctivo actions
lecture! conducted ui/perEonncl & procedure For data shoot
revised
GALLAGHER, J M Philadelphia Electric Co BO/05/12 Bpp
--0007230730 forwards IE Insp FlBpts 5O-277/79-3O d 30-370/79-33 on
791201-31 !. notice of violat i on. Apps A b B
DHUNHERi E J Flpglon 1. Philadelphia. Reactor Operations Nuclear
Support Branch BO/01/21 3p p
—0007230732 Notice of violation. App A, Prnm insp on 791801-31
* Region I, Philadelphia, Office of the Director 00/04/16 Ip
~B00723073fl Wotic* of violation, App B, from insp on 791801-31 Portiona
uitlihcld (ref 10CFR2 790)
* Flegian 1, Philadelphia, nffite Df the Dir»ctor BO/04/1& Ip
—800733073(1 IE Inop Repl» 50-277/79-30 t. SO-27Q/79-33 On 791S01-31
Nnncompl iance noted failure to follow radiation protcctian
requirements !< tii recoid reoc-tor inntei' chlortde da to
accurately Portions withheld (ref 10CFR2 79O)
GftEENMAN- E 0 , DLDUOH. A R Region 1> Philadelphia. Office of the
Director MCCADE, E C Region I, Philadelphia, (toac tor Operations
Nuclear Support Brunch BO/Ofl/li lOpp
8007210197 rtck receipt of 000309 Itr informing NRC of stopn taken to
correct violations noted In IE; Insp- Hepts 50-277/79-09 &
30-376/79-10
ORIER.BH Reglnn i, Philadelphia, Office at the Director
80/07/02 Ip
8007IB010& Submits reply to IE Dullntlr, BO-ia r« cracking in core spray
spraoera No criirks usere Pound in insp oF Unit 2 Ir.5(i af Unit
3 la 1 11 be performed during noit refueling outage
DALTROFF.SL Pli i ladelpbin Electric to 90/06/13 Spp
6007180117 Submits viiolij to 3E Cullpbln 79-14 rp spistnic analysis for
as-built safety-related piping BIJB All Unit 3 taf etij-related
piping ta oporuhl« in present condition
DAt-TRDFF 3 U Phtladelpnla Eiectrli. Co aO/fM./13 3pp
9007170S07 Updfltta BOOTHS environ qualification rept For Class IE
elactrical equipment in response to IE Dullotim 79-OIB
For-marifs reviBi'd paget; 6 info re high enorgy/ortE bTDah
profiles !< LOCft profiles fur rcflLtor bldgs W/o ends
DALTHOFF.8 L Ph l ladnlph i o Electric Cn (10/06/17 Bpp
300721021S ResponBa to NRC B0041A Itr re violations b deviation
noted in IE Ir>sp Hepts 30-?77/'79-09 4 30-378/79-10
CoTractive actions meetings held or each shift to inform
operators of plant status & arij unusual plant conditions
DALTROFF.S L Ph i laileliihl a Electric CD 00/03/09 Bpp
-B007210336 Forwards IE Insp Rept* 3O-S77/79-09 1, 30-278/79-10 on
790'319-30 Et notlcot of violation (c deviation
OR1ER.D H Region 1, Philadelphia- Dffica flf the Director
8D/04/1A 2pp
8007210232 Notice of violation fr-om insp on 790319-30
* Region 1. Philadelphia, Dffic-e of the Director BO/OH/14 Spp,
B00731023S Notice at deviation from inap on 790319-30
» Region 1, Phi ladelphta, Office of the Director GO/03/14 Ip,
B5
— 8007210307 IE Insp Ropts SQ-B77/7'9~0? (« 3Q-27B/79-1O on 790319-3O
Noncompl lance noted failure to provide adequate- retraining
program for nonl icenmed personnel t< Failure to perform QA
audits
HUNTER. D R . MARTIN, T T . QAGL1 AflDO, T E Region 1. Phi lad elph la.,
Office of the Director BO/03/11 71pp
B007H 10547 Responds to IE Bulletin HQ-11 hasonry malls in proximity to
or having attachments from safety-related pining & equipment
identified in ftpp A Justification for TB -evaluation criteria
will bo submitted utthln 1BO days Affidavit end
DALTRDFF.S L Philadelphia Electric Co GO/Q7/QE I8pp
S007BS0511 Responds to IE Bulletin BO- 10 re contamination of
nanradionctiVB sya !• resulting potential far unmoni toi ed,
uncontrolled release at radioactivity to environ Mod
program initiated for listed identified sys
DALTRorF.S L Philadelphia Electric Co HO/G7/O2 3pp
B007240430 Confirms oral notification that 20~day period for completing
tests required by Item S of IE Bulletin 80-17 started
800708 NRG licensing project manager should be notified If
test mould cause sever* impact on pouer reliability
ORIEIR.B H Region 1. Philadelphia. Office of the Director
80/07/09 Spp
BOQ70301B4 Forwards reviiod emergemij plan Plan 1= baton! an eiistirin,
mutorcHogical capabilities t< reflects critorin of NUFiEfl-
0654 Vork County. VA emergent y plan Pncl Mains withheld per
Privatg Act & nvailsble in Central Filrii only
BAUMi E ft Virginia Eloctric I. fouier Co HO/Ofa/.JO 2pp
SO0717O'112 Forwards revised nuclear security personnel training ft
qual i f icaticn piogram. In Tpsponsp tu BOO"5IB Iti Program
withheld IreF 10CFRB 790)
SVLVIA.B H Virginia Electric i, Power Co BO/0//14 lp
Adjudicjtorij t orr
BO0731O243 Forwards Commission R0t)!137 memorandum t< ovdar cunlalnlni
decisions on UCS 7S05OK petition For recent i deration of
780413 memorandum & order UC3 7711O4 petition sought action
re fire- protection foi- eloctrital calilrg
E1SENHUT,D Q Division of Licenstny QO/06/E& Bflpp
3007110339 Order giantitig pjtpnbinn until Bf>OJS3 fnl Comrni salon to
elect whether fcc review decision taken undo"- IOCF"H2 H06 arc
roquost for en Foi> cement at 1 1 on. DD-BO-SH
HOVCE. J C Office of the Socrotary &P the CommiBtlun HO/07/O'?
E3007BB0360 Flequestn extension until 800 BO"? for outage to perform scram
tatts on Unit 3, required by IE Bulletin BO-17, "Failure of
76 of 183 Control Rods to Fully Insert During Scram at DWfi "
, J H Philadelphia Electric Co 80/O7/33 2pp
Periodic opei-atino reports (< related correspondence
800731041'! Forwards "Environs Radiation Monitoring Program, 1979 tt
ttndlological Regional Environ Monitoring Program Kept 15,
1977 "
WILLEEV.U Q Philadelphia Electric Co BO/07/00 lp
0007300412 Ad vi no s that effective ElOOaOlp addrcas for coelitloii ui 1 1 be
11QS-C Dlive St, OrepnsborQi NC ?7<101 Itelflted correspondence
ALLEN, J NQTth Anna environmental Coalition BO/07/19 lp
H Qanffrol correspondence
8007130047 Responds to 000337 1 tr to President CnTter re granting VEPCO
authoritij to build another nucloai plant Discussifa titl 1
plants., operating t, under const ti roliitlvc cnsts iif lortl vs
nuclBBr energy
VOUNGBLODD. » J Operating Hi-nctDrs Branch 1 *]0/05/ln Spp
--B007310417 "Environs Radiation Monitoring Projram. 1979 "
* Intoro Corp 60/09/31 lOQpp
— 8007310420 "Rad iological Regional Environ Monitoring Program Root IS,
1779 "
« Radiation Management Corp 80/O3/01 HDpp
6007180419 Forwards monthly operating ropts for June i960
COONEY.M J Philadelphia Electric Co BO/07/10 Ip
— B0071H0433 Monthly operating repta far June 19BO
ftLDEM, W M Philadelphia Electric Co 80/Q7/10
9pp
S Rttportable occurrence*, UEds !< related carrDipondence
3007070333 LCR BO-031/03L-0 on BOOtOSi during BUPVCI 1 lanes tff«t, areanur »
tultch PB 3 3 ISC found 0 3 ptig aboVB Tech Spec limit,
Cauaed h\j tetpolnt drift Buiitch retal ibr, testad d returned
to ivc
COQNEY.M J Philadelphia Electric Co BO/O6/3O lp
BOO70BOH16 RO on BOD339rRHR motor failed Caused by failure of lower
guide bearing Instructions issued to operate RHH ays at Full
flou conditions Fan* on motor shaft andi being replaced
Failed motor replaced lit/new motor
COQNEY, M J Philndelphia Electric Co BO/O6/30 5pp
6007210378 LER BO-OH/03L-0 on B0060S. luhi le performing 3T 6 9, valve
MO 3-10-S6B failed bo close after sttoked open Caused by
mechanical problem In valve, MD 3-IO-3AB bo be disassembled &
repaired
COOMEY, H J Philadelphia Electric Co BO/ 07/11 lp
B007O70OS9 Fot-mar-de D0062O Direct-or'a Decision DD-HO-aU, denij ing
BOQ21B. 32. 0425 (- O&35 rc-questa fur ,n tion PR notice uncl
DENTQN. H R DPfscc lit Huclirac Roaetor Degulatinn, Director
flO/Oi/SO Spp
--B0070700A1 Decision DD-90-a'i ilenyini] 00021(1,32, 2B. OlSti (r 092& roflupBtn
by North Anna Fnvir-on coalition far action
DEMTON, H R Office of Nuclear Reacbor flogu 1 atl on, Diroctor
so/06/ao aspp
— a00707OOfa9 FR notice of issuance of GOOtSO n,IDCtor'* Decision Dl>-DO-y
denyino BOO21B, aa.aa. 0425 & O3?1 requests (.« North Anna
Environ Coalition ftir action
DENTOM. H R Office of Nuclenr Rent lor Flcgula I i nn. Diroctor
— HOO7070O73 RuquvstE ,imentf to UUOHln ) ti rollnulinj discovery of addl
problamB in Bream generator Facility ihould be kept shut
daun pending resolutian of nui IP, sociintlflry cltomis tr i), turb in«
cracks & Soral neral i ler pr-ul>lems
ALLEN, J North Annn Cnvir onrnontol Coulitlor 130/03/33 lp
— BOO7070O7"? Floquos Is ar 1 1 on cane ernln-g Uef ec tivo demlneral Imr duel on
relatei) corvosloiv t< cracking in tloata generatars It turbine
discs CotnmBinSo NflC ileriiion lo roijihlfo EIQ TO eiperlmental
replacement of steam goneratora
ALLEN. J North Anna Environmental CoaHtlon BO/02/ 10 4pp
J Insuvanco Si inil*mntty infnimation
8&07150'190 Foruiacila EnuornBiimntE EH Sr 21 tn NfLIA Policy NF-240
P1ERCE.D A Marsh !< McLennnn, Inc , M *, M Mucleor (,onsuUun<.a> Inc.
Dlv HO/O7/1O 3pp
B0072BOM-? RD 2-80-1H/1P on B007ai,uhile testing Unit 3 durinj
refueling outage, scram bat It up valves in air supply to
control rnd drive scran valves failod Caused by design
•rror Manual venting provided
ULLRICH, W,T Philadelphia Electric CD 90/07/33 2pp
DOCKET 50-BSO 8URRV POWER STATION, UNIT 1
F. Security, medical, emtra'icy ti fir-e protection plans
B0071B0196 Foruiards NRC 800435 1 tr to all power reactor licensees! IT*
response to B00929 Itr re emergency response facilities at
reactor sites Bites Hi/approval to USB closed-* ircult
tvleviilon link u/techni cal support cir listed
CRUTCHFIELD, D H Operating Reactors Branch 5 BO/07/07. Hpp
P Dpprating license stage doiurnentu i>
0007330099 Requests submlttal of pT-o(i(jtsrt TIM h Spui «hanget prnvldinj
for redundancy in ilc-cov heat removal capability In all modos
of operation Model Toch Spots which would p-rcividn flt cu|t trtb IB
t-Baolutlon end for a«'l*anco
EISENHUT.D 0 Division of l-icenilnji SO/Of,/ I 1 frSpp
B007010422 RespnniJfi to NRC BOOBOI Ui re lose of offstte power lU'Viuw
DP hiitor(j reveals two partial lussee. of off si to pauor
DC currod
•BYLVIA-D ft Virginia Ele-ctrli; t. POWBC fa t)0/{»>/r& 3pp
BO-07O1OH30 Confirms dgrirement w/NHC rt> revieuj trttnia in bu used tn
evaluate results of rod swap taaVs f< ndtnlni sir a t ion of1
physics tuit program fthould duvlationi ticrur
THOMAS. VI W Virginia Electric & Pouipr Co BO/Ofi/E'ft 6pp
DOCKETED ITEMS
» 703011 I ftpp I ir,jt ion far- amend to Licenses OPSl-32 f« DPH-37 consisting
• t pi tijiiiaeil thrttujes t,i Torn bpeca
EHQUSUN. J H ^ngtina EJcitric ' Power Co £10/06/30 3pp
— BQ07100365 "General Arrangement High Radiation Sampling Sy3 Waste Tank
fc Pumps, Plan Elevation 314 Ft, i Inches (, Section " Shoe* 1
• NUS Corp 80/05/29 Ip
•0070301 IS lvaln.it ion ?.
.1 fl,:i h,J (1,4 1.4 1 *
p-urfoi flume o-
HO/O&/1Q A2pp
J7H30001 nmnfflsfco hutimi t t.t I of appj nation for Jimend to license
onsiutins nf Fecli Spot changea J, IjLense conditinns PWFI
Indtl Tnh (ipoct f, hmlel 1 iconic condition* for TMI-2
OBHonii f-sariii-it (..itegur v A items ent.1 For suidanie
IliCNHUT.I) « Olviaion af Licunaina 30/07/05 fo^pji
70-Q041*? I'oruav ilr. ndrti i n Fo re neu fuel storage area for proposed
tiJiiigo ()"> tn T-neh Hji ec 5 j p Dr rpLprit telton
Vl.yift.ll n Virginia Ulectrir !, Power -Co 3O/O7/03 3pp
7100373 iiutimits flil <tl info re i mp) emantn ti on af snort-term Loscona
oarrmd 1 oqul rr-nif ntt atatus &r remaining Category A Horns,
irt-tfl- »taliiii uf design «, i ne td 1 la 1 1 on op Category Q muds &
(.hoiFulu for imji 1 umimtfl 1 1 on one! ForuJSMla drauinija
Vf.VIA,l) R Virami.-* El&ttrit tt PQUHC- CQ BO/07/O7 IBOpP
007LOOy/7 "dump Pump Discharge Piping Auxiliary Bldg to Containment "
» fitone !H UobBtor Klig im?er 1 na Corp 79/05/15 IP
007IOOPPO "yump Pump Dischargp Piping rtunliar-ij D 1 d 9 to Containment "
1 atonu <" WobBter Engine uTing Corp 77/10/34 Ip
—6007100371 "PMD Liquid Sampling " Sheet I of 5
* NUS COTp 80/05/05 Ip
— 8OQ710Q373 "PtlD Liquid Sampling " Sheet 3 of S
* NUS Corp BO/OH/05 Ip
— H0071003BO "Pt,ID Liquid Sampling Prograri
* NU9 Corp 80/05/03 Ip
Sheet 3 of 5
--B0071Q03B2 "P&ID Liquid Sampling Panel " Bhoet 4 of 5
» NUS Corp BO/05/05 Ip
--B0071003B7 "P!.ID Liquid Sampling Panel " Shoot 9 of 3
# NUS Corp 80/05/03 Ip
—8007100391 "P&ID Containmont Air Sampling Sys " Sheet 1 of 1
« NUS Corp BO/09/05 Ip
— 3007100403 "PraceiB Floy Diagram Liquid Sampling " Sheet 3 af 2
a NUS Corp 80/05/22 Ip
— B0071Q04Q7 "Process Fl DUI Diagram Containment Air Sampling " Sheet 1 of
1
« NUS Corp 80/04/14 Ip
007 1 OO^ffl "Floui Diagram Doron Rocnv^ru Sija " Sheet 1
" StDhO t. H-uti»tBr Enig t neoi-i 115 Corp BO/07/0-7 If
3071-QDCUl) "Flnw D-iisgram Containment Atmcepliere Cleanup Sijs "
« fltonB t< Webtktffr Eng IDCBI- 1 rig Corp 77/10/23 lip
00710(lSV:i "Flow matjram Wjatu Disposal Sya " Ehoet 3
* •Utano & Wnfctlor Cng 1 necr ing Corp BO/07/O7 IP
J0710D27H "Cluui Dlagrnm Uastc Disposal Sy s " Sheet 1
* Sitonii '< WoLi»tnr Eng 1 ne-pr ing Corp 80/07/07 Ip
>d71GOIDJ "Wont t Uittod Thevma) R^camhinor "
* fltorio t. HubH-df rna in«prinfl Corp HOyo4/07 Ifl
>071()0:t09 "I'MD Lin.uid Sampling " srieet 1 of 5
» NUS Curp flO/Ofl/OS Ip
I'MD Linuid Sampling " sneot P. af 3
NULi Cnrp RQ/O2/11? Ip
— BO07I&04Q9 "Oenoral Arrangement Auniliaru Dldg, Drumming Room Plan.
Elevation 27 Ft, & Inches " Sheet 1
« NUS Corp 80/05/2? Ip
— BQ07100414 "General Arrangement Auxiliary Qldg. Drumming Room, Section 6
Details " Sheet 2
« NUS Corp BO/03/29 Ip
— SO 07 10041 3 "General Arrangement High Radiation Sampling SyB Waste Tank
& Pumpu Plan, Elevation 37 Ft, 6 Inches fc Section " Sheet 1
*• NUS Carp SO/03/S9 Ip
Q00721O435 Submits update to status of evaluation of asymmetric LOCA
loads on reactor pressure vessels t, references Phase-C
results, WCAP-97"1S. submitted by Mestinghousc on 800630
SYLVIA. D R Virginia Electric & Power Co 80/O7/14 2pp
fl007310flai Comments on NUREQ-0977. "Potential for Lou Fracture
Toughness & Lamellar Tearing on PUR Steam Generator &
Reactor Coolant Pump Supports " Requests eitension of review
period to S00919 to review stress corrosion cracking
BROUN, B C Virginia Electric Si Pouier Co BO/07/21 Sfp
)(>/lDO;)ItI "I'ilD I iqmd Sampling Coolers " Sheet 3 of H
" NU« Corp I3O/03/OS Ip
ll'l 'TJilD LinuiH Sampling Panel " Sheet 1 oP 9
« HUD Corp yn/o-i/ca IP
"PMD- 1 iqulil Sampling " 1 of 3
« NUB finrp RO/fl&/'OS >P
)07100Jfi'? "F'fcID «nnl3>lriment !. Air Sampling Si/s " Sheet 1 o
» NUB Corp flO/O5/a5 IP
Q Inspection rejiortH, IE Bulletins d correspondence
6007240330 Forwards IE Info Notice SO-2D, "Lois of Decay Heat Removal
Capability at Davis-Beauc Unit I Uhilo In Refueling htodo "
No response required
O'REILUV, JP Region B. Atlanta. Office of the Director BO/05/OS
2pp
BOO 7020200 Forwards IE Info Notice BO-22. "Breakdouns In Contflfnlnat ian
Control Programs " Mo uirlttan response required
, J P Region B, Atlanta. Office of the Director 00/O3/2Q
"PrucOBfl Flow Dingr-am tiQiiiil Samp 1 1 ng " Bhuet 1 oF 2
» NUB iorp FKVO3/3P IP
i071003:ifl "n
* NUB Corp
Flow Diagram Liquid Sampl in9 " Sliect a of S
B0071401&9 DiBcussBS BO0438-23 radiation survey which revBaled
radiation levels on trunk surface exceeding regulatory
limits Forwards notice oF violation & notice of proposed
imposition of civil penalties
STELLP.V, Office oF Inspection b Enforcement. QFPiCB of the
Director BO/OS/H8 3pp
071003-17 "I'rntutB F 1 nw Dugrjm Containment flir Sampling "
* NUS Corp RO/04/1-1 'P
0/IOD391 -Qenern] Ar r/ing em«"t Auxillniy Blue, nrumminfl Room Plan,
Elevation 371 Ft " Blifret 1
« NU8 COrp fiO/OS/a1?, IP
07l(XK)5tf "OB»>r»l Ar^^
c- ft&tniJt " Sheet, a
• HUB Corp BO/OS/a?
ent flu. 1 1 iary Bldg.
R-om, action
— S007I40174 Notice of proposed imposition of civil penalties in amount
of *B-OOO for Item of noncornpl iance ro radiation leveli on
truck surface piceeding regulatory limlta
* Office oF Inspection ic Enforcement, Office nf the Director
£0/05/28 Ip
BO07210477 Forwards IE Circular 80-13, "Grid Strap Damege in
West inghouse Fuel Assembliec " No written response required
O'REILLY, J P Region 3. Atlanta, Office of the Director 00/05/B8,
IP
DOCKETED ITEMS
"Loss of Suttion to Emergency
nulred
of ttie Director
BOQ7Q1O239 Forwards IE Info Notice BO-,23,
Feeduater Pumps " No written response T
O'HE1ULY.JP Region 3. Atlanta. Offic
IP
BQO72200ibi forwards IE Info Notice 80-36, "Evaluation of Contractor
(1A Programs " No unttun response required
O'REILLY.J P Region a, Atlanta, Office of the Director BO/Q4/IO
app
80O7160307 Forwards IE Info Notice BO-27. "Degradation nf Reactor
Coolant Pump Studs " No specific action OT response
required
O'REILLY.J P Region a, Atlanta, Office of the Director 30/O6/11
IP
BOO7O90O57 Forwards revision to Page 3 of QOO&l 1 response to IE
Bulletin 80-12, "Decay Heat Removal Syn Qperability "
BVLVIA.B R Virginia Electric !. Pouier Co 80/06/16 Spp
B007090423 Responds to IE Bulletin 79-01B, "Environ Class! Plcati on of
IE Equipment " Class IE electrical equipment reviouied to
ensure functioning during postulated accident Revleiu of
Action Items liS (< 3 provided in encl repts U/o end repts
SYLVIA, B R Virginia Electric fc Powei Co SO/06/16 3pp
8OO70207S7 Forwards IE Bulletin BO-15. "Possible Loss of Emergency
Notification Sys (ENB) M/Loss of Qffsite Power " Written
response required
O'REILLY, J P Region S, Atlanta. Office of the Director 80/06/18
BOQ7020434 Forwards IE Circular 8O-15. "Loss op Reactor Coolant Pump
Cooling tf Natural Circulation Cooldown " No uiritton response
required
0'FlEIL.l.Y, J P Region B, Atlanta. Office of the Director QD/Oo/30
Ip.
8007130462 Ack receipt of IE Insp Repts 90-280/80-16 J< 5Q-2B1/00-17 No
proprietary info Corrective actions to Enforcement Action
BO— 2B strengthened r ad waste monitoring program implemented
Oaduaste section restaffed
BYLVIA, D R Virginia Electric b Poiuer Co BO/O6/20 3p p
— BOO71B046B Foruiards IE Itisp Repts 30-360/00-16 (• 5O-2BO/00-17 en
Q0042S No noncompliance noted
D'REILLY.J P Region B, Atlanta. Office of the Oireitor
BO/03/3B 2pp
— 0007150-171 IE Insp Ftepts 50-280/80- .16 & SO-SBl/HO-l? on 8OO123-2S. No
noncompl iance noted Major area* inspected shipment of
raduiaste for burial. Including shipping paper requirements,
labeling, placarding St radiation levels
GROWN, R A > POTTER, J P . BTOHR, J P Region 2, Atlanta, Fuel
Facility !< Materials Safety Dranch BO/05/ OS 9pp
B0071A0543 Forwards payment of civil penalty per NflC HOQS38 notice of
proposed imposition of civil penalties re IE Insp Rapta
30-280/80-16 & SQ-aBl/BO-17 Violations based on radiuaate
shipment arriving at sit«i u/eiceaaive radiation
SYLVIA- B R Virginia Electric t. Pouier Co BO/OA/2O Ip
B00717OI19 Forwards IE Circular 80- M, "Bad i (.active Contamination of
Plant Demlneralned Mater Bys !< Resultant Internal
Contamination of Personnel " No written response required,
Q'REILLV.J P Region 2. Atlanta, Office of the Director SO/06/34
8007330370 Forwards IE Bulletin 00-16, "Potential Misapplication of
Rosemount Inc Models 1151 & 1153 Pressure Transmitters
H/Eitlier A or 0 Output Codes " Written response required
IE Circular BO-16 also entl No written response required
O'REILLY, J P Region S, Atlanta, Office of the Director 80/06/37
Ip
B00721O030 Responds to unresolved items in IE Insp Repts 5Q-3BO/80-14 t,
SO-SHl/flO-lS Believes ueld repair of Liml torflue enclosure on
MOV-FW-151D uas performed per specified procedures
Nondestructive test e<am will be perPormed
SYLVIA, D R Virginia Electric & Power Co BO/07/O1 3pp
BO0711O1B9 Forwards reactor coolant pump support drdininm & dBHciiption
of piitnp support dlHassambly t< Insp procedures' In response to
NRC 8DD707 Itr
SYLVIA, B R Virginia ElectrU 1< fouler Co BO/07/07 Spp
— Q00711O193 "Reactor Coolant Pump Supports General Arrangement "
» Stone t< Webster Engineering Corp 7B/O7/30 Ip
— 800711OJ9-4 "Rpdi tor Cgols.it Pump ^ufp
* Stone !. WPbster tngineor inff Corp
Sheet
Ep
— B00711O19A "Re,n tor fool.int Pump Support Details " "iliect 1
B Ston* t. WHlister ETIIJ inccr ing Turp 70/07/30 If
3007170334 Forwards "IE Eulletm Ali-H.iy Fit'V i PHI. " in rosponou td If
required by Item t of IE Bulletin HO- 1 ! , "MaRonriJ Wall
Design " flep t rtVHil^blc in Ccntfril Ftlea only
SVLVIA. B n Virojtila Elertrn t- POUIBT Co BO/0//C17 Ip
eOO72S05'l5 Forwards response lo [E Hnllctin BO--OD, "Lian of Cnntal
Liner Penetration Uelifs " Ponetration ,i <memb I i c-s nF Plueil
head Poriring design lue-re iftod foi pprntratlons listed in
Tablc-s 1 k S Far North Anna
SYLVIA, P R Virginia ElcctrK tt Power <,o KC/0//O/ 7pp
[fesponils to IE Dti 1 1 o 1 1 n (50-1O ro ccin tami nil t mil at
nonrad iojic t tvo <iij 5 Uib t 4 sijr, i on title i Pil nunr.iil 1 aac 1 1 vu but
potent! ally rorfionctivD thi ouuh inter Fat en ui/radionttive
By* All discharge patfis art* s.implHiI or muni tnred
BVWIA. B R Virginia Electric J< Power f,o HO/07/0/ 2pp
60O7I1O33& fiBBponHa til Items I' t. 3,s of IT DullnUji S't -37. "LosB of
Class IE Iriotruirrenlatt on t< Contrnl Ppupr ^i^s lus During
Oppration " Unit 1 i iwer I er trip wns nut r<-ljtei( to fiillure
modes described m bifllvtln
SVLVIA. B H Virginia Electric !, Pc-uer Tn (10/07/07 Hpp
0007170539 Forwardi response to NRf OOOfclD Itr re violation nottnl i
IE Insp Reptu bt)-adO/00~17 ?, liO~BSl/t)ti-».1 nosponuc
Ultthliffld (ref 10CFHL' 79O)
SVLVIA.R tt Viralriia Elcrtrit t. Power Co HO/07/ 11 Ip
0007290^20 t aruijiras reoponoe to NlfC BtHH'L'7 Itr re vinlallona linteil
IE Insp Repts 50-EHO/79-70 !< 50-JF31/ ;<P~fJO CorTflLti vo nttlon
all relaaso- procedureii ruviouod ft rliflngodifls nuc OBttiirg
Attachment 2 uilthhi'ld (rof 101 Ff)3 790)
BYLVIA, fl n Virginia Elucti-ir !. Poun-r Co BO/07/31 rtpp
R, Period it op or at ing reports & related correipandonce
BO07170309 FoilKiirdt monthly qpcrrtlillfl rdpts for Julie 1«H)
SVLVIA.D n Virginia Electric t, fouler Co BO/O7/U Ip
— aoo717O3'91 Don Hi I y opera linn ropls Par June 19130
DUNN.B 0 Virflirjia Elecbrir !. Power fa DO/07/07 lljin
S Reportablo uc c urrimc. us , LEIts & related -cnrreipondpnci)
PNO-II-E10-OVB on BOOAO3, urii t tripped uhen fire disflbluif
one of Pour Instrument buBur, Planl. In hot MiuHouti wh t ] e
licensee replarirs truriapot mcr fc ifiluto» horon concentration
for reatiirt Li^cnsea- Issued prnta release
WE&BTER, E II . KULUDOOi P «l Flpglnn H. Atl.inta. (Iff]c& of tho
Director ao/OA/O3 Ip
flOO7O1043'7 Foruiard& LEU Ga-C
MILBON.J L Vlrginin Eloet-rii t. Paiuer C(>
— 8007010^-12 I Elt BO-03B/O3L-0 nn (JOO5fJ9, din ing testing nf nlr
divert valve TV-SV-£02i mui oporating .ilr ill FPurimiial
pressure Ericuuilcd r.itlnij nf ASCtJ aolpnolr) vatvn Cnumid Iiv
gso of irofiropor iTeHijn crltiiriu during vnlvir Inslnllutlon
MILBON. J I Virginia £li>ctrir t, Powpr Co Bn/O(,/Pft Sfp
B0070703B9 fl
W1LBON.J I-
iuaril!, LER
Vlrsinifi ClBclrli
-0
Power Co
— 0007070397 1.1:11 BO-O^O/OIL-O nn BOOMO. JOT irifl 1 OQX pimur opera
laoln tion vulva far JDR-TK- Jp leiiked dur i njj rele-mu nf
I-GR-TH-EA, eousing unsamplinl release from liinfc I) TaiiBed bij
•tfoter iora tioii of valve aiopliraijin Wilvu repaiTifd •
WILSON, J L Virginia Eli'ttrit J. Power Co aO/0//OI Mpp
BQQ7O70SS4 Foruiards LE-fl
HILfinjg.j L Viromln
f. Pouor Go
IP
— eo07070Sa? LER RO-OE9/OaL-U on SOOWJ. Uim ing noifflal opnrBtlon. vital
Q Sola fai 1 erti inl tjji ting aulomfll ic tm btn« runlini ^ Cauend by i
fai Jure of f i 1 tcr in-y ctip.u i tar in Holfl tr^Tiformp
re-pnerir i ic-H fruris former rt-ii) ncr<l
UILBON.J L Vtroini.1 Eleitnc I, Pjuinr Co O()
88
BOO7210Q92 Part 21 Tept re enstencc of nonconserva t IVB assumption in
cold shutdown de-sign basts boron dilution accident analysis
in FSAH Cdused bij use of incorrect iys vol H-cvleiu all I be
performed to idpntiFy !. analyie aodl accidents
SYLVIA. B R Virginia Electric f. Power Co 80/07/0-2 flpp
B00714O241? Forwards LEU BO-O39/O1 T-0
W1LSGN.J L Virginia Electric f- Power Co-
80070700-59 Forwards 800630 Director's Decision DD-BO-23, deny Ing
300210, as, 0429 t 0323 rciiue-sts for action Ffi notice end
DEMTONiMH Office of Nuclear Reactor fiegulation. Director
BO/06/20 2pp
— 6007070064 Decision DD-BO-23 denying 800218, S2. 28i 0435 b O329 requests
by North Anna Environ coalition for action
DENTO-N.H R OfPice of Nuclear Reactor Regulation. Director
BO/06/30 35pp
— 80071-10339 LEU nO-039/OlT-Q on BOOtSb, potential discovered for ooron
Concentration nntic nnaervat i sm during dilution accident u/FlCS
at reduced vol Ana lysis of boron dilution at coJ-d tc hot
shutdown being twaluatad by redctor vendor
WILBON, J L Virginia Electric !, Poiuer Co SO/O7/O0 2pp
-9007070069 FR notice of Issuance of 800420 Director's Decision DD -00-23
Denying 9003)0. S3, 38, 0429 fc O529 requests by North Anna
Environ Coalition for action .
DENTOMi H R Office- of Nuclear Reactor Regulation. Director
2pp
B0072B06O7 Forwards LEHs BO-O13/03L-O !. flO-O<H/O3L-O
L Virginia Electric I. Power Co SO/O7/24
— BOO73aQ(,ia LEfi SO-O43/O3L-0 on B00703, dur ing normal nperat i on. c ondenser
inlet valve MQV-CW-10&C mould not ciosc when operated from
control room Caused By broken atufl'v allowing motor stator to
back ant
, J L Virninia CleLtric 6 Pouer Co BOVO7/24 Bpp
0007aa0623 LED flO-005 /03L-O on E30O6J3. p i pe -stress re-ana 1 (JB i a indicated
baseplate anchor- bolts on hanger H-3 on line 12 inch -CC-27-
121 tc hanger H-9 on lino 12 inch-CC-33-131 overttrpsBeif
Mn-d » to anchor bolts complete
M1LSQH.J U Virginia Electric ft Pauor Co BO/07/21 3pp
V Operator CiarainatiDns
B0Q7I7034B Foriuard* reviseil, "Licensed Operator Requali f i cation
Prog ramp " in r*aponse to HRC H0033B renuBBt All training
instructors ar« required to (.artictpatB in program to
ma In tain proficiency
fl Viroinifl Electric It PQUET Co BO/07/15 lp
— 8007070079 Bequests action concerning defective demineral 1 zir design,
ri-lotp-d corrosion ti cracking in steam generstoro & turbine
disc-B Commends MRC deci«ion to require EIS re experimental
replacement of steam generators
ALLEN i J North Anna Environmental Coalition 8O/O2/18 4pp
Responds to HD McDonald 1 tr directed to. DDE North Anna full
poWBr liconsu isauance will be dlscuasod u/Commission in
Jul-Aug ItBO Burry is in Dhutitown condition due to seismic
piping supports mods & uill return to pouar in Aug 19SO
VDUNOBLDOD. B J Licencing Branch 1 SO/Da/2S lp
8007030693 Foruardn HH MtDonald Itr e»preE5ing concerna ro continued
operation of facilities
DETANCOuni-G EnerflU.DBpt of- 80/0(b/04 3pp
•J Insurance !< Indemnity information
B007J 30490 Forwards Endoraements SB t. 29 to NEUIA Policy NF-310
PIERCE-D A Marsh & McLennan. I nc , M fe M Nuclear Consul tanti, Inc
Div BO/07/10 3pp
— 8007170330 Revised. "Liconsed CJpEratcir Hequa 1 i f i catii
K Virginia Electrit & Punier Co BO/O7/G1 ]]pp
DOCKET 30-201 BURRV POWER STATIUH. UfJET S
F Security, medical, emergency << fire protection plane
Program
P Operating 11 co-use stage documents & correspondence
BO 0723 009 9 Request* tubmlttal of proposed Tech Spec changes providing
for redundancy In decay heat removal capability In all modus
of operation Model Tech Specs uhich would provide acceptable
resolution end tor guidance
EIBENHUT.D 0 Division Of Licensing BO/06/11 i2pp
800718-0196 Forwards NHC 800133 Itr to a31 pouier reactor licensBB
response to BOOSH1"1 Itr re trncrgEncij response Facilities at
realtor sites Sitss in/approval to usu c I OKeiJ-c ircu 1 1
television llnl u/tecfinical support c tr listed
CRUTCHFIELB, D M Operating n*Bctors Qrancti 3 DO/O7/07 Spp
BO07310037 rtdviscs that 79OB2O aafetu evaluation re Unit 1 mods
correcting unilerpouer capacity conditiQni on 4BO volt
imurgencij buses applies equally to Unit S Modi are
acceptable
VARBA.S A Operoting Reactoro Branch 1 BQ/Qk/ZQ Spp
B007030134; Forwards revised emergency plan Plan is baaed on eiiating
meSoro.lagical capabilities E. rc-flecti criterln of NJflEQ-
0654 Yor* County>VA emergency plan end Plans withheld per
Privacy Act k available in Central Filos only
BrtUM.E A Virginia Electric >, Pnuer Ca BO/Ofa/30 Spf
BOO717041S ForuardB revised nuclear security personnel training d
p.ual i f ication programi in response to B00315 ] tr Program
uitthheld Href 1QCFR2 /gO>
SVLV1A, a n Virginia Electric I. Poufr Co BO/0//14 1p
0 Ad jtid 1 ratory c orr es pond c net1
BOQ731C343 Forwards CommiESinn 800337 memtiTandum !i order containing
decisions on UCS 78Q5D3 petition for reconsidETfttlon of
730413 memorandum t. order UCS 771104 petition sought action
re fire protection for plertriLal cablen
EIBENKUTiD G Division of Litpnains EJO/Oi/HS B9pp
0007010122 RespondH to NRC BOO BO"? Itr re loss of orPsite power, Review
of history reveal 5 tun partial IOSEUS of offaite nouar
occurred
BVLVIfl, G R Virginia Electric tc Poyer Co BO/06/Bh 3pp
B00701043O Confirms agreement u/NRC re rpvletu criteria to ba used to
evaluata results of rod auiap tests !< administration of
physics teat program should deviations occur
THOMfiSi W N Virginia Electric «. Pousr Co 90/06/26 opp
8007030131 Application For amend to Licenses DPR -33 d DPR -37 consUting
of propgeed changes to Tech Specs
FERQU8DN, J H Virginia Electric fc Pouier CD 80/06/30 3pp
— QDO703O135 Evaluation ic proposed changes to Inch Bpecs Sections 3 3,
3 4,3 in 3 8,1 1,4 5 & 4 11 re containment spray sys
performance
« Virginia Electric h Pouier Co BO/06/30 AHpp
BD0711033-? Order granting e.teniic-n until 800723 Cor Commission to
elect whether to rrvipu decision, taken under 10-CFR3 2-Ofa on
re-quBB t Por enforcement ac ti am DD-B()-a3
HBVLE.-,f T. Office of the Sfcrrt.Tiry up the CnmmiBgton 80/O7/0?
8007290001 REquests submittnl of application For amend to license
consisting &f Tech Spoc changes (• license conditions PWfi
Model Tech Specs tc Model license conditions for TMI-2
Lessons Learned Category A items one! for guidance
EJSENHUT, D 0 Division of Licensing BO/07/02 &9pp
0007300412 Advises that ef*etfwi> B009O1 , address for coalition will bi
1103-C Olive St. GreenUjnro.NC H7401 Related curre ipoiidencB
ALLEN, -J North finna Environmental Coal it ion BO/07/ 1 ft lp
aOO70B04l(7 rorwards addl info re neu fuel storage area for proposed
Change 83 to Tech Specs, per recent telcon
BVLVIA. H R Virginia Electric R Pouer Co SO/07/03 3pp
H General correspond one
B007I30O17 Responds lo 8003H7 Itr to President Carter re granting VEPCD
authority to build another ituciear plant Discusfiea util
plants., operating & under cons-t & relative colts of coal vs
nuclear eueigij
YOUNODLOPD. Q J Dpuratirifi Beactois Hranch 1 BO/05/1T Spp
8007100273 Submits arid! info re implementation of short-term Le»sons
Learned requirements Status of remaining Category A items,
mid-yr status of design tc installation of Category 19 mods ti
schedule for implementation anc 1 Forwards drauingn
SYLVIA.B R Virginia Electric ft Power Co SO/07/07 IBOpp
DOCKETED ITEMS
07230370 Forwards If. Bulletin HO-16, 'Potential 111 •sap p 1 I cat i OH of
Rosemuunt Inc Models 1131 J. 1153 Pressure Transmitters
W/Eltner A or I) Output Codes, ' Written response required
IE Circular BO-16 alsu enc ! t-io uritten response reuuired
DJRE1LLY, J P Reomn 3. Atlanta Officp DP the Dlrc-ctar QO/06/27
IP
07210030 Responds to unrpsalved it-ens in IE Insp Repts SQ-SBQ/BO-lfl *
30-2B1/BO- 1 b Belt eve i weld repair of Limitorqi)* enclosure on
MOV-FW-l^lD ua-i performed pur specified proced-urps
Nondestructive tent at am tiill be performed
SYLVIA, D a Virginia Electrn ti Pauer Co BO/O7/G1 3pp
07110J89 Furuiards rear tor rciclaiit pinup *uppni t diiiuiings •& description
af pump fcuoport disassembly & irisp p raced uret. in response to
NRC B007O7 Iti-
SYLvIA,B R Virginia ETlectnc !. Po-ui&r Co BO/O7/07 Spp
-BQ07110I93 "Reactor Cnolant Pump Supports Qeneial Arrangement lh
» Stone !. Webster Engineering Corn 7B/O7/ao »o
— DOO717O391 Monthly operating lepts for Junr 19BQ
DUfJN.S I) Virginia Electric t. Power Co BO/07/07
41pp
S lieportable occurreriLi
LITRE R related correspondence
B007O1O340 Forwards LER BQ-CO7/03L-O
WILSON.J L Virginia Elettric f. Power Co
BO&VOI0394 LER DQ-007/Q3U-O on QOOAOiu u/uni t in cold shutdown,
detectors found inoperable Caused by breaker trip at motor
control ctr which feeds detectors fau^c of breaker trip
WILSON, J L Virginia Electric Si Pauier Co
2pp
BOQ721CJO9H Part 21 rept re enatence of noncnnKervative assumption in
coltl shutdouiu det-ign ba^ls boron dilution accident analysis
in FBAR Caused hi; irse at incorrect SUB vol Review will be
performBd to identify 6 analyie addl accidents
BYLVIA.B n Virginia Electric !. Pouer Co 80/07/03 4pp
-B0071 10194 "Reactor Coolant Pump Suimoi ta [)Dt,illE " Shcc-L 3
a Stone !. WHlister Eng ineEr ing Corp 79/07/"3Q tp
B0071B0319 FormarilB LER BQ-OOH/O3L-0
WILSON. J L Virginia Electric H Poufe
-B0074 10194 "Roactlir Coolant PuraR Buppprt DetflllB " Sheet 1
if Stune (, WebstBr Eng iiiepr i ng Corp 70/07/30 lp
J07170334 Foriuarrto "IE Bulltrin 6U-Uay Hevipu, " in response to action
required by ] fccm 4 of IE Diillotin 80-11, "Masonry Wall
Deiign " Rcpt available in tentrsl Files nnlij
BVLVIA.G R Virginia Eletlric (. Pouier Co 80^07/07 lp
— B0071B03S7 l-Efl 80-QQB/Q3L-O on B00623, ulii le performing periodic teat
3t, 1, found air ejector- monitor "ala,rin setpoint above Tech
Spec raquirument Caused J>y instruinont drift Alarm setpoint
rt-cal ibr
W1LBQN,J L Virginia Electric !, Pcuier Co BO/07/11 Hpp
V Operator E»aminations
0072505^5 Forwards response to IE Bulletin 00-08, "Ejam of Co-nta i nrnunt
Linor Penetration Welds " FenetratiDn asEpmb 1 IE 5 of f 1 ued
heart forging Design were used for penetrations listed in
Tables 1 t 3 for North Anna
SYLVIA. n R Virginia Ele-ctric !, Pouor Co DO/07/07 7pp
OQ071703flB Forwards reviaedi "LicenBed Operator Requal i f icatlon
Program," in response to NRC B0033D reitueat All training
Instructors are required to participate in program to
maintain proficiency
SYLVIA, B R Virginia Electric t, Pouer Co 60/07/15 lp
007370940 Responds to IE Bulletin DC1-1O re c ontamindt i on nf
nonradioattive syi Lists si^s lonsidPred tionrad i oact i ve but
potentially rail ioai tl ve through tntcrf ac-cs ui/r ndionc ti VB
tijs All discharge paths flrp sampled or mntiitort-d
BVLV!ft,D Fl Virginift Electric t. Power Co [10/07/07 2pp
10071i04o4 IdcntiFicf, pi op Died .actions, to be taken in response to IE
Bulletin 79-11. "Scisnut fmnly&ia for As-Suill Safety-
Related Piping 5y* " Screening pi CK ess will be used for Tech
Spec sy& to identify s jgni Pieantlij aver otras sed supports
BPENCEfi. » C Virginta Electric t, POLISH Co BO/07/09 3pp
1007110336 Responds to Items B ti 3a of IE Bulletin 71J-27. "LOSE of Nan
Class IE Instrumentation t. Control Pouier 'iy.'s Uus During
Dp oration " Unit 1 inverter trip was not related to failure
model described in bulletin
SYLVIA. u n Virginin Electrit. t. Fotuc-r Ch 30/07/09 Spp
— BOO-7170350 Revised. "Licenced Operator flequal i f ication Program
» Virginia Electric & Power Co BO/07/31 llpp
DOCKET 50-362 PfiAIRIE ISLAND NUCLEAR STATION, UNIT 1
F Security, medical, emer geticij ^ Fire protection plans
B007020233 Foruiard s request for limited revisions EC addl info re 790323
plant safeguards contingemcu. plan Encl uithheld
(raf 10CFR2 790)
CLARK. [( A Operating Reactors Branch 2 80/0fc/10 5pp
30O7110115 Forwards responae to NRC 800618 questions re safe shutdown
in event of firo
MAYER. L D Northern States Pouer Co BO/07/OB 3pp
9007180371 Submits tlaMficalion t add! info to Q007QB I tr- responding
to IE Bulletin 79-lfl Apprai 291 suptinrts needed Str-uening
process mill stcompBny determiiiati on of over&tressed
supports for mnii. eiceedtng 30 dfli;t>
BKGVIN.S C vlryinia ElectTir >, Pautr Co DO/D7/11 Sup
8007S90365 Responds to 3O07OE3 discussions ui/MRC re B007OB response to
IE Dullotin 79-14. "Selomir Anali/si? For rts-Built Hafetg-
RelatBd Piping Bye " Approi 294 supports identified to
require installation
BRDHN.g C Virginia Elettric *. Ppuur Cn B0/fl7/ll Hpp
BOO7170S39 Foruflrds rosponsp to WR(, BflOfalB I tr re vsolntion noted ih
IE Insp Hepts sa-PQO/SO-l/ & !iC— 2SJ /BO-B3 Response
Withheld (ref 1QCFRS 79O)
SYLVIA. R Fl VirBinin Slectn- '. Paver Co B&/Q7J 1 4 lp
S007390PRO Fnruiadls response ID Nilf O()OA,'7 1 tr re vi ill ntionE noted in
IE Insp Repts MI-?BO//9~ra ft T'O-Bni /79-OO Corrective action
all release procedure's rBvinui&d !i tdang-ed. fls nccessiiry
ftttachmeht 2 withhold (i-Bf IOCFR2 7903
BVLVIA, Q H Virginia Elettiit t. Pouipr fa BO/07/2L 4pp
SO07110390 Buliniti info rs actl'ins prnpn^nd upon startup per IE
Bulletin 79-14 Prnpo-.al Bred i tfitiMl on previous pr DC edent s Ct
tomml trosnts set fur facility ', i^ t uns 1 s.tent ig/miitutll
concern for naff apei a tinii nuque^tt prompt c i,nt irnation
8PF.NCEH.W C VirgitiiH Electttr '< Pijuier i~.r, fiO/OU'OQ -Jpp
rtipor-tn f- rel.iU'il t iirroMrQnd i
0 Ad judicatovy correap ondence
B007100a08 Ach receipt oP tine BOOCilf Itr to O CharnofF re nonrecelpt
of State of HN 00043-1 contentions Certificate of Svc end
OLSON. J. F Minnesota. State of BO/Ot/23 3pp
B0073 10543 Foruards Commission 80O537 memorandum t< order containing
decisions on UCS 78O5da petition for reconBideration of
7E304-13 (nemorandum b order UCS 77UO4 petition sought action
re fire protection for electrical cables
EIBENHUT.D 0 Division of Licensing BO/Oi/35 B9pp
8007230132 Amended Content i DUB 1 J. 2 ?. uiithdraual of Contention 3 Amen
request does not cnntain safety anolijaiu re spent fuel
storage !c does not contain analysis at spent fuel pool
expansion c onsoquijin: as Certificate of Svc encl
GLQDN.J F , SENECHAL. M E . SPANNAUS.U Kinnesota. State of
SO/07/ai 7pp
BOO7310493 ConCirnis A5LD request for hoering space at Federal bldg in
Baint Paul.HN on SOOBOA to conduct 1-tJay prehearing
conference re facility
BTEPHCNB.C R Dach^ting * Services Branch 60/07/22 lp
fi007BDOi.EJ9 Comment 5 stating no objection to admission of State of HN
B007S1 Contentions 1 a a re cash drop accident l( loss of
vjat or accident in spent fuel pools Reserves rights re
substance li validity uf contentions Certificate of Svc encl
BARTH. C, A Hearing Branch 3 80/07/2S 3pp
80071703H9 Fnruiurils mnntlily npoialint) repta foi June 19BO
BVLVlA.fl R Virginirf Elsttnc !< "oiupr Co RO/O//lfl lp
91
B0073004i3 Responds to State of KN BO 04 24 suppl to petition to
intervene & BOO7H1 amended contentions Supporting
documentation, notices of appearance of JE Siberg •!« IJL
Bernstein on behalf of util d Certificate of Svc eni. 1
BILBERO. J E Northern States PDUJET Co SILHLRG. J El Sham. Pittraan.
Potts t, Trowbridfle BO/07/23 34pp
H General correspondence
B00731O526 Responds to £300336 1 tr re constituent concern about
evacuation routes around facilities NSC t> FEHA engage in
program to upgrade emergency preparedness including
evacuation planning
DtRCKB.Vl J Office of the Enecutive Director for Operations
BO/07/21 2pp
end constituent Itr about evacuation
— BOQ731Q523 Requests info r
routes around facilities
DOBCHUITI.H Senate 60/02/36
B007O2Q054 Forwards IE Infa Notice 80-22.
Control Programs " No written response
KEPPLER. J 0 Region 3, Chicago. Offici
rt qui I ed
Of the Dn
oiuns In Contamination
80/03/28
ipp
0007210363 Forwards !E Circular SO-1J, "Grid Btr-ap Bamane in
Westinshousp File] Assemblies " Ho written response required
KEPPLER. JG Region 1, Chuago. Office nf thi- Director BO/D5/SB
IP
HOO7Q10127 Foiwards iE Info Notice BQ-23, "Loss of Suction to Emergency
Feodwater Pumps ' No un tt*i> response required
KEPPLEFI.J Q Region 3. Chicago, Office of the Director 30/05/29
BQ073401B5 Forwards IE Inap Hcjits 50-28,3/150-09 t< -50-^06/80-10 on
BQ0501-31 No noncoiTipliance rioted
HEISHMflN.n F Region 3, Chicago. Reactor Operations Nuclear Support
Branch 60/06/06 ?pp
P Operating license stage documents !. correspondence
6007230097 Requests submitta! of proposed Tech Spec changes providing
for redundancy In decay heat removal capability in all modes
ct operation Hod el Tech Specs which uioitld provide acceptable
resolution end for guidance
EIBENHUT, D 0 Division of Licensing BO/06/11 62pp
B007O30222 Notifies NRC of intention bo ahip radio*
facilities using Model HN-600
MAYER. L D Northern State* Power Co 80/06/13
:tlvc matl from
IP
— B00724Q21Q IE Insp Repts 50-Si)J/n()-09 & 50-306/00-10 on 600501-31 No
noncompl ianco noted Major areas inspected fnaint.
surveil lance, security, radiation protection, f olloujup of
licensee reported events t> followup bo IE circulars
FEIEHAHEND.C D , BURGESS, 11 L , DOVD, D C Region 3. Chicago, Office
of the Director BO/O6/05 6pp
B007010260 Responds to IE Bulletin 79-17, Hevi s i on 1. "Pipe Cracks in
Stagnant Berated Wat or Syu at PUR Plants " Visual insp
requil ed by Item Hla) was completed on Unit 1 u/no
corrective actions necessary
GILBERTS, D E Northern States Power Co BO/06/09 Ip
8007010581 Responds to 800513 Itr re containment purge info by
forwarding related correspondence
MARTIN. R A Operating Reactors Hrancti 3 60/06/16 3pp
— Q0070103B3 Responds to EQ!t& 800513 questions LOCA dose calculations
completed Monitors are redundant, gas !< purticultibo monitors
provided. each giving isolation signal
HUBDLF. D Northern States Pouer Co BO/06/03 lp
Be to NRC
— B007Q 10385 PJequeita preliminary evaluation of licensee respon
79103'? "Interim Position for Containment Purge (( Want Valve
Operation Pending Resolution of Isolation Valve
Oporab i 1 1 by, " Generic Item D-H4 Evaluation form encl
REEVES, E A Operating Reactors Branch 1 (Pro BOG43B! 79/13/27
6pp
B007170076 Summary of B005&0 rneetins u/util ro TOPROD Fuel design
MARTIN, R Operating Reactors Branch 3 BO/O7/O1 7pp
B0072SO001 Requests submittal of Application for emend bo license
consisting of Tech Bpac changes (, license conditions PUR
Model Tech Specs l< Model license conditions for TMI-2
Lesaona Learned Category A items encl for guidance
EISENHUT-D 0 Division of Licensinfl HO/07/02 ft9pp
B0072HOO36 Advises of intention to ship radioactive matls Prom listed
facilities using Package Model CN8I ftL-33--Jt>
HAVER. L O Northern States Pouev Co 80/07/03 lp
BQ072403BB Advises of NHC reorgani lation on 000129 which resulted in
number of changes in ofc titles, posl tions !* assianmenta of
personnel Also submits info for OETR
NOVAK, T M Assistant Director for Operatiria lleactors BO/O7/OB
3pp
3007200110 Foiuards comments on NUREO-0577. "Fracture Toughness l<
Susceptibility to Strpaa Corrosion Cracking of Equipment
Supports," in response to NRC S00519 request Addl analysis
for stress torrosion cracking IE unnecessary
MAYER. L 0 Northern States Power Co BO/07/21 5pp
Q Inspection reports, IE Bulletins t< c orroipornience
B0070700S1 Fot-uiardt IE Insp Repts SO-2B3/BO-06 & 50-3Oi/BO-07 on
BOD401-30 d notice of deviation
HEISHMANjR F Region 3. Chicago, Reactor Operations Nuclear Support
Branch BO/05/21 2pp
— B007070056 Notice of deviation from Jnsp on BOO401-30
" Region 3, Chicago. Office of the Director 00/05/16 lp
— BOO7070061 IE In«p Repts 50-HQ2/BO-Ot. fc 50-306/80-07 on 80O101-30
No noncompliance noted failure to complete (nap required by
IE Bulletin 70-05
DOYD, D, C , FEIERABEND.C D Region 3, Chicago, Office of the
Director BO/05/16 7pp
B007010267 Responds to Ib Bulletin BO-06, "Engineered Safety Feature
Reset Controls " Safety syi schematics reviewed Teat
demonstrating safety equipment remains in emergency mude
after reset will he completed at neit refueling outage
GILBERTS, D E Northern Stoles Pnuer Co E!O/Qi,/O9 2pp
B007010517 Responds to IE Bulletin tiO-03, "Viicimm •Condition Resulting
in Damage to Chemical vol (onlrol Sys, (CVQB) Holdup Tankt "
Chemical !< vol control sys !< tofflpnrient s ti gaocout t< liquid
Waste disposal syi, !< componentB uiere rcvieuiin)
QILDERTSjD E Northern State;, Pouicr Co 80/O6/07 Spp
8007160707 RoEponds to IE Bulletin UO-05 Revleui of chemical J< vol
control lya indicates holdup tank vulnerabi li tij to collapse
Lou suction pi-ensure trip to be installed o-n holdup bant
transfer t> retirculfltion pumps, bij B101OI
OILDERT9, D E Northern filatPs Puuer To SO/06/O9 2pp
8007220312 Forwards IE Info Notice BO-2&P "Evaluation of Contractor
OA Programs " No written responBB requned
KEPPLER, J 0 Region J. Chicago, Office of the Director BO/O6/IO
IP
0007160192 Forwards IE Info llolite BO-37, "DDflr.idol ion of Reactor
Coolant Pump Studs " No specific action or response
required
KEPPLER, J 0 Hegion 3, Chicago. Office of the Dneclor BO/06/11
IP
B007030043 Forwards IE Bulletin BO-IS. "Possible Loss of Emurgen-cy
Notiftration Sys (FNH) H/IOES of DfF = iU Ptuer " Written
response required
KEPPLEH.J Q Rooinn :i, Chicaqu. Offite of the nircctor BO/O6/1B
IP
B007020373 Formal ds !E Tircular 80-15. "Loss of Reactor Coolant Pump
Cooling Ji Natural Circulation Conldouin " Mo luritten response
required
KEPPLER.J 0 Region 3. Chicago, Office of the Birocbor BO/06/2O
8007140094 Ack receipt of end hOOhl7 I tr informing IJRC of steps taken
to correct violations noted in NRC S001P2 lt»- Ent I withheld
(rflf 10CFR2 790)
HIND.J A Region 3, Chicago. Bftf equal la Orsnch 00/06/24 lp
B007170306 ForuarriB IE Circular 00-11, "Hadicaf tive f ontamlnatton of
Plant Dtminui al i 7(f<J Mater Tijti ti Resultnnt Internnl
Contamination of Personnel " Nn written response required
KEPPLER.J 0 Region 3, Chicago, Dffico of the Director BO/06/24
lp
0007140186 Ack reCBint of 800M12 Itr irfurming NR< of stepB taken to
correct deviation nolui) in If Insp llupts SO-2i32/flO-06 ('
30-306/80-07 forwarded by 000131 Iti Senior resident
inspector mill follcw remaining test- lit)
HEISHMAN.R F Region 3. C!ticj|i|o< Hi'uitnr Q|)«i fltidnl. Nuclear Slipporb
Branch 80/06/2b lp
92
~fl007l4Ol»S Responds to deviation noted in IE iTiip Repts 50-282/80-06 t<
50-30 (j/HO-07 Forwarded by B00521 1 ti Special insps of tun
out of four nnueT npuraterl relief isolation valve mntoT
Starters have been romplpted Tuif) others uill be performed
GILBERTS." E Northern State* Ponufi- Co 30/06/12 Ip
GQ0729traO RQ BO-20 on 800719, lu/Uni t 3 at 100'/ pouicr t. Unit 1 at cold
ihotdoun. room generator aepar-ate-d from grid t< one offsito
source un« lost* tri pp ing reactor ft coolant pumps Caused by
•severe El«ttrlcal storm Transformer restored
TIERNEY.F f Northern States Power Co BO/07/16 Ip
8007330336 loruaids IE Bulletin HQ-lfc, "Potential Hi saPP 1 i c ati on of
Roscinount Inc Models 1151 *< 1153 Pressure Iran ami t tera
H/dther A or D Output Codes ' Written response r-equirsd
IE Circular BO-16 also oncl No written response icquired
KEPPLEfl. J O Reflion 3. Chicago. Office of til e Director SO/Ob/2
Ip
B00731O106 Rospund* to JE Bulletin BO-10 re contamination nf
nonradiogc t i ve «nj a Requested actions complete Specific*
aval I able at site
GILBERTS,]} E North*™ States Poupr Co BO/07/03 Ip
aOO715QjflBl ftdwiaps thai demonstration of ultra -ionic lnsp me thud for
detecting under c lad tracking in ruractoi vessel no i lie region
for Unit 1 IB scheduled fur BQO723 Unit 3 map will take
place during 1"9B1 refueling outage
HAVEH.U 0 Northern States Pouter Co BO/O7/O7 Ip
0007290669 Forwards LER QO-O19/03L-O
MAYER. L D Northern States POUJBT Co
— 3007370677 LER BO-O17/03L-0 on B00fa30. two pouor range high pouer trip
cetpoints mere over Tech Spec limit Caused by peraannel
error Rept revicued tc technicians cautioned
HUN9TATJ, A fl Nnrtlie-rn States Pnuior Co 80/07/31 Ip
DOCKET 50-384 IDAHO STATE UNIV REeEAnCH REACTOR
(t Inspection reports. IE Bulletins Si correspondence
BO07Q7O197 Foruards IE lnsp Rept BO-2B4/8Q-01 on 000389-30 No
nnncomp lianco noted
KELLY, A F Region 4. Dallas. Office of tho Director QO/Qi/SO
B00725OO77 Forwards response to IE Dulletiti 30-11, "Masonry
Design " Concrete block walls are not In same design
philosophy as design of Trojan plant m<isonrij mails Halls
mare generally designed as partition walls or shield ualls
GILBERTS, D E Hart hern States Punier Co BO/07 /OS Mpj>
B007230090 Submits ipply to IE Bulletin BO-OB re examination of
containment Uner penetration tuelflt BevitnJ nf Unit 1
roveal-ed tuJQ deficient uielda Further response ufill be- sent
kg BOOB 10
GILBERTS, D E Northern States Poiuep Cn 90/O7/1O Ip
Submits reply to IF Bulletin 79-01G re environ qualification
op Class. IE pq.ijipinBnt Qualified limit switches have been
ordered <i are scheduled Far replacement during future
outages Morteheets encl
GILBERTS, D E Northern Btfltes Pouer Co HO/O7/1O Bpp
— 80070701tl IE Inap Rept 50-284/BO-O1 on B00329-30 No noncoropHahce
noted Mnjo-r areas inspected secuiity plan. alarm GIJSI keuii
loc ks> harduiar B. communicatl on B i fc survei 1 lanes Detaili
uilthhelil (ref 10CFR2 790)
CALDWELU.R A , HELLV, A F Region 4. Dallas. OPflee of the
Director BO /Oh JIB Ip
DOCKET BO-2B3 FORT CflLHDUN STATION, UNIT t
F Security, medical. Birmrgencij h Fire protection plans
S 007 23 0530 KoruiardE addl info supporting security contingency pl'ni ti
revised page to Chapter 3 of site securitij plan Info t,
revision withheld (ref lOCfRa 790)
JQNE8.W C Omaha Public Power District BO/07/09 Ip
0007330311 Submits leply to JF uullctin 77-17 re pipo cracfca in berated
water sijs Viiual insp required bij oiilletin uas
sat i sFactori 1 y conpletcd for Unit I No corrective actions
necessary
OILDERT8.D E Horfchiirn Statet Power Cn BO/O7/10 Ip
H Peri oil it operating rupartc E< rnlitted c arm sp ondencu
0 Ad jufllcatory corrcspondencB
BO07310243 Forwards Commission 8O0527 mrmorandum d order containing
decisions on UCS 780303 petition for reconsideration of
7B0413 memorandum t< order UCB 771104 petition sought action
re fire protection for electrical cables
EIQENHUT.D O Division of Licensing 80/06/35 89pp
G00703O170 Forwnrds "J979 Fnviron Monitoring (r Get, 1 ooic.i I Studios
Program fiopt," Vols I b 3
WARD-, E C Northern States Pauier Co BO/Oft/30 Ip
— 00070301CO "I'iTf Enviran Mocntonng It Ecological Stud i as Pr-ojram Rept. "
Vol 1
• Northern ntates Pouer Co 30/OA/30 32Spp
--HOB7030IH3 "197V l-civicon Monitoring 1: Ecoloaical Studies Program Rept,"
Vol 2
* Northern Statca Pouier Ca BO/O6/r3O 32Spo
S007I605S8 Foriuards month ly operatltig repts for June 1990
0 Northern States Pouer Co BO-/07/II Ip
— B0071A05faa Monthly operating 'Ppts for Ou-ne 1730
HUNSTAD-A A Northpm States Pouer Co 80/0:7/01 *?pp
B Reportable occurr unce-Ci LERs f. rolateil c orrospondc-nce
fl007!*06dO RO 3O-1B an BOQfeE"?. a team generator 13 EiperJnnced minor
primarij-to-'ipcanilary leakage UP all an t O OOA gal]cu!. per
minute Leakage uai cnrefully dionitorpd ti sh-oiued Incroase
Pacillf-y It shutdoun Coulduun is planned
P Northern States Power Tn BO/07/O1 Ip
B007B10437 Foriuardt LEH BO-Olfl/OST-0
HAVER, L il Nortticrti Ktate'. i'nuier Co 80/07/1:1 Ip
—000-7210444 LER BO-OIB/OIT-O on BOO/01 . inn t uaa shut dnuin due to loaking
tubs In hot leg uf vei-iical stt-ain (jencrntor 1 a. West inflhouBe
Series S! Cau&e not stated tlefcrtlve lull e uiill iio plugQBd
HUH5TAD, rt A northern States POUBT CD 00/D7/1D app
0 Advisory Committee on Reactor Safeguards reports & corrmpondenc*
7906aaolf}<b Sommariies responses to IE Bulletin 79-06D Operating manual*
arc being scrutinized OperatloTial personnel arc being
trained Radioactive gases tt liquids tranafer lines are
intarloclod u/ -containment Isolation t«/or radiation slgnali
TAM.P Division of Site Safety t, Environmental Analysis 79/05/Ofl
Bpp
P Operating license stage documents !< correspondence
B003I90062 Notification of 8Q03O7 meeting ui/utll in Betheflrfa.MD to
discuss analyses required t, methods used in evaluating
aagmmetric loads
WAOMER. P C Operating Reactors Branch 3 30/05/09 Ip
S007Q30194 Forwards "Technical Evaluation of Electrical,
Instrumentation t< Control IDotign Aspects of Override of
Containnmnt Purge Valve Isolation b Other Engineered Safety
Feature Signals for Port Calhoun Nueloar Poiuer Plant "
CLftRK, R A Operating Reactors Branch 3 00/06/04 3pp
— 0007030303 "Techrncol Evsluotion of Electricali InstrumBntation !i
Control Design Aspects of Override of Containment Purge
Valve Isolation & Other Engineered Safety Feature Signals
for Fort Calhoun Nuclear Pouter Plant "
HACKETT.D II . RADDBEvlC.J II , DRODER1CK.N E EOS.Q, Inc
URCL- 15172 00/01/31 15pp
SO07S30D91? Requests, suhrni ttal of proposed Tech Spec changes providing
for redundancy in decay heat removal cspabllity in all modgs
of operation Model Tech Specs uhich uould provide acceptable
resolution enc 1 for guidance
E1BENHUT,D G Division of Licensing BO/06/ 11 62pp,
B007020O67 Summary of B0061O meeting u/util ra work performed after
B00907 meetinfl on asymmetric loads analyses
UASNERiP C Oporatini) Roactori Branch 3 QO/06/1B, 3np
DOCKETED ITEMS
93
S007Q10fl71 Forwards results of leak rate teats perfor
Item 3 I b a of NUnEG-O578
JONES, W C Omaha Pub Hi Pouer District QQ/06/25
in response tc
— 8007Q10477 "Integrity of Sijs Outside Containment Likely to Contain
Radioactive Mat! "
* Omaha Public PorJer District BO/O6/S5 3pp
B00730Q07S Comments on proposed rule lOCFRfrO re Fire protection
installation of stand pipe & hose & tat ion inside containment
presents potential safety concern re boron dilution In event
of pips rupture
JBNEG,U C Dmaho Public Pouer District BO/06/33 3pp
BQ0702Q430 Responds to IE Bulletin 0U-09. 'Hi]fli amot or Attuator
Deficiencies " Nn ITT Oent-ral -jctuatori are installed ,it
f ac i 1 i Ly
JONES, U C Omaha Public hiiuicr District BO/OS/J? Ip
Q0070202i3 Forwards IE Info Notice BO-22 "Ureakdiiums ITT Contammatian
Contrel Programs " No untten ruspon'it rcquiierJ
SEYFRIT,!* V Region 4, Dallas, nffnc of till' DirPttor QO/Ob/aB
B00702Q557 Forwards "RCS Asymmetric LQJd s Evaluation Program." final
rept in response to NRC 7BOi35 1 tr to PUR licensees re
asymmetric LQCA loads C-E affidavit for uithholdina end
Proprietary version of App A withheld (ref IOCFR2 7901
LUHDVALL.A E C-E Operating Plants Owners Qroii|i BO/06/3O 2pp
D0072103"iO Forwards It Orculdt 80-13i "HriJ Strap Damage in
West inghnusu Fuel A&semb 1 J e& ' No uiritten T e r, (i n n s e required
BEVFRIT, l< V Region 4, Dal la*, uffite of the Director SO/05/2B
IP
— 8007O20574 "RCS Asymmetric Loads Evaluation Program," final rept,
Vol I
« C-E Pouer Systems BO/O6/30 2Opp
0007010093 Forwards. IE Irifo Notice BO-iiJp "I os^ of Suction to Emergencij
Feediudter Pumps " No uinttetr rpspunsi> ipquire-il
SEVFR1T.H V Keg i on 4, Dallot, Office of the- Director aO/03/29
B007O203BI "RCB Asymmetric Loads Evaluation Prooranii " final rept.
Vnl a
* C-E Pouier SyBtoms BO/OA/30 300pp
fl00702038B "RCB Aoymmalric Londfi Evaluation Program." final rept, Vol
3
* C-E Powor Byatems BO/06/30 3OOpp
"RCS Asymmetric Loads Evaluation Prrigrani" final rept. App A,
numerical results, ffvaloation of C-E fuel Nonpropvietarg
version App D. Palisades Fuel analysis, enc 1
* C-E Pouer Bustems BO/Q6/30 atpp
— B007O30399 "RCS Asymmetric Loads Evaluation Program," App Cipipe uihip
restraints Ii App D, plan far fracture analysis of util told
leg piping Final rept
» C-E Power Systems SO/O6/30 lipp
8007190165 FouiardE IE Insp Kept no-aa-i/BO-O^ on 00050^-06,13-13 I, 22-
23 No noncomp 1 lance noted
MADSEN.O L Region fl, Dallas. Rn.ictor Construe 1 1 on i< Enginearing
Support Branch BO/06/D4 2pp
--B0071501V1 IE Insp Rept BO-^Bb/BO-Oy on B005Oti-Oa. 12-15 !. 32-23 No
nontrjmpllance i>oted Major ai-eai intpetted orngi ets on IE
Bulletin 79-M, startup prcparat i or., renc tor (oolant pump
cover stud detei loration !' folluuiup insp
HC8TERMAN.T F , KELLEY, D I Reyion 4, DoltrtB, Office of the
Director BO/Oi/01 4pp
&OD7020419 Formal ds response tn IE Bulletin BG-Q!i. "Engineered Safety
Feature (CSF) Reset ContrfilL> " bummnry of equipment
deviations during resetting of engineered safiity features
actuation ays one)
JDNES, W C Omaha Public F'ourer District BO/OhfOf, 5pp
— a007020tOO "RCS Asymmetr i c Loads Evaluation Program, " App E. ECCS
analysis approach rj/reducod area coolant channels in
peripheral assfembliBG Final rept
« C-E Pouer Systems BO/Ofa/30 9pp
000722013fl Forwards IE Infu Notice BO-^6, "Cval ua ti cjn of Contractor
QA Programs " No written response rpquir-ed
BEYFRIT.K V Region 4. Dallas. Office nf the DlrPttor BO/Oi/10
8007080364 Provides update re evaluation of asymmetric loatia per Jan
1978 rsqunet Several approaches considered to tubs tantiate
util position that safety problem dace not eiist Detailed
discussion of plan due no later than BQD9O1
JONEB.H C Omaha Public Power District 00/06/30 3pp
8007160331 ForuiardE IE Infu Notice 110-27, "Uegrdrtdtiorr of Ruacto-r
Coolant Pump Btutls " Mo spocific atlioir or response
required
SEYfRITiU V Renion 1, Dallac, Uffite of thp Director SQ/Oii/11
B00717063B Confirms telcon re NRC contract peraonnel 900706-11 site
vl*lt to perform engineering analysis to identify vital
areas at plant Contractors uilll require access to plant
info & areas Proprietary info will be protected
WAGNER, P C Operating Reactors Branch 3 BO/06/30 2pp
8007230001 Requests lubmlttal of application for amend to license
consisting of Tech Spec changes !< license conditions PUR
Model Tech Specs tt Model license conditions for TMl-a
Lassons Learned Category A items one 1 for guidance
EISENHUTiD G Division of Hcrnslng 80/07/02 69pp
8007240333 Advises of NUC peornani latmn on 8004EB which resulted in
number of changes in ofc ti tl es. posi t i ons t> asEignments of
personnel Also submits info for OETFt
NOVAK, T M Assistant Director for Operating Reactors BO/07/OB
2pp
00072 BO 5 30 Responds to NRC request for evaluation of plant RCS
ausceptlb 1 1 ty to nverpreaaur i lati on events Ma 9-5 input t>
•nergy input analyses sections mure re-evaluated using new
valve discharge coefficients
JONES.W C Omaha Public Pouer District BO/07/15 6pp
Q Inspection reports. IE Bulletins ti correspondence
8007020399 Responds to IE Dulletln E10-C14, "Analysis nF PUR Main Steam
Lino Bread w/Continueil Fct-duater Ailitition " Reanolyuis of
reactivity increase* will be submitted by OOOS16 Containment
preasure response analysis is being peifoimed hrj vendor
JDNEB.W C Omaha Public Power DiBtr-ict BO/05/OB Spp
B0070B0075 Foruards reEponsc to n|ifn Item S.Cnrl 13 of IE Bulletin
79-Q1B H/o responee
JONES, W C Omaha Putilie Pouor District BO/03/13 Ip
B0071100a<, Ack roieipt of QOO^da 1 tr informing NRC of steps taken to
correcl violatiDnn noted in Ifc Inap Kept "iu-2fl 5/80-03
MADBEN, Q L Rpg inn 4. Dalliis, F*e.ictnr Operations Nuclear Support
Dranch SO/Oib/20 Ip
—8007110096 Responds ti> NRC B00415 Hr re violations noted in IE Insp
Ropt 50-2B')/80-Oa Correcliue at t inns (Iflint Prot edure MP-RV-l
uill be revised lo indicate specific valver, pr ncedurp
applies to
JDNCB, W C Dmdfoa Public POULT LUslritL UO/O5/Of) 3pp
B007240047 rorLFords IE Circular (10-19- "loss of ReaLtor Coolant Pump
Cooling d Natur.il Cirtulatirin Coul druid " No uiitten reiiponse
required
EEVFHIT.H V DDIIKIII 4. DalJai, nff 11 e of th« IJirertor BO/06/30
IP
a007IBOiia Ack reLiipt uf B00fil3 1 tr informins NRt of steps taken to
correct violation noted in 1L Inap Rppt SO-HBQ/BO-IO
BROWN, 0 D Region 4, Dall.ix. Funl f-atiHtg t, Materials Safety
Branch BO/O7/O1 Ip
— B0071801S2 Rpspunilb to NR1. 000583 1 lr i <• violation noted in IE Insp
Rept 30-28a/aO-lO Correct WP actiuns tethni i i aim
reinslruc tfd an rcnuiremr'nt to Ltmrluct full surveu Fire
door alarm repalied
JONES.W C Omahn Public Ponier Di-.tntt riO/Oft/13 2p p
8007S30358 Ailvmei MRC Of id«p i osull". o* cont.unmerit n-r irculalion
piping check vdlvp.Sl-151? v.ilvp uns fuimrf in "liXe HPUI"
Condition u/no valvp flogruddtiirri oti'i-r/pd *< i e t-ni-ni'il to
oparatinn u/o notn for moint
JONES, M f Dinsha Putin. Pnuci UiEtnrt PO/O//OrP lr
DOCKETED ITEMS
O7310324 Upilati'S info re
SCYFR1T.KV Rpaitin 0. Dallas. flffi
t< type* of i Uent j Fi
of the Dir
tni s to Frici 1 1 ty
SO/07; H
072eOi>01 Foruflrils summary oh irradiated Fuel insp Following Cycle 5
operation perfurjriiMl during I'tBU refueling uotage Mo major
abnormal ties observed in sn irradiated Fuel assemblies
inspected HD failed fuel pint Mere observed
JONES, W C Omaha Public Power District HO/O7/15 3j>p
Periodic operating reports J. related c orrespondeni
07170376 Foruiaid* monthly: operating T-ept For June 1 9BO
JONES. H C Omdha Pub]ir Pcuj*r Uiitrxrt 80/07/09 Ip
B007170379 IIOtltMy operating rnpl for Jump 193(1
H1CKLE. D J Omaha Public Power District 30/07/09 -?pp
SO07370S22 Motion for r econsiderati on of Commission Q0Q53O order re
portion instituting ad jud icatory hearing before ASLB Interim
Operations Task Forue rept, SECY-t'EI3, el 1ml natei basis For
comment ement of investigation
UfMNDENBUHG, I) L Cons nl 1 dated tuison Cu of Neu York PRrtTT, C r*
Power rtutfiority of the State of New Ynrk BO/O7/3'> 13pp
H Oeneral correspondent
BO07S1020I3 Responds to uncl BOQ11S 1 tr to President Carter re
Point facility Describes NRC efforts to protect public
health at facilities currently operating or planned for
opeiation Village Voice nemo article enc 1
DENTONi H F] Office of Nuclear floactor Flegulation, Director
BO/05/21 lOpp
B007170259 Rosponds to BOOSQt, Itr re statue t, responE i 6 1 1 ttiea for
emerpEncij preparednos B in Fncilitg envlronG TEMA has lead
responBit 1 1 ity in uffsite Emergency planning
GRIMES, B K Emprnency Preparedness Program Office BO/O7/Q7
Reportable p-c ciirrenccB. LERs ti related c or
I Financial information
J7O7O375 Forwards LER BO'Oi 1/O3L-O
STEVENS. <3C Omahfl Public Pouer District BO/0&/25 Ip
B007aB04il Foruiarde rtnnual Financial Rapt 1979
DAVME.J P Power Authority of the ^tate of Noui Yord
30070703BS L.ER BO-Hlli/Oni -0 on 900528. dur nig J980 refueling outage
type B b C con tain me nt ) P3ti idte tcsts^ total leak-age-
eiceedei 0 61-a limit frius.ed by leaking fuel t^snsfB^ lubei
elet trital. mi-chani tal -ilsi'vc >i piping penetrations
CDRE.M . COfJNDLlEY.J I Oma*a Public Pcuer District 60/06/16
7pp
— B0072BO'163 Annual Financial Rept 197?
» Pouier Authority uf the State of New York BO/07/34 fllpp
O Advisory Committee on Reactor fiiif t'guarde reports R correspondence
>7240J30 horuards LER BO-O16/UDL-O
iTEVEHS.SC Omaha Public Pouiir Diitrvct BO/07/21
0-07EH3O131 LEB BO-O !6/O3L-(> on (300621 , <uel ti on suction side of pump
CH-1S in demineral 1 led uiatei flush line cradiei) Cnused by
vibration of piping in svc Clack uias gronnJ out t< reuelded
utintj cFrtificu prDcedDrf- !r 1 1 np tested
JEWELL. HA Qnulia Puhlic Pnujcr Dittnct toQJOt./'ZS 4pp
KET 50-JB6 INDIAN POINT STATION, UNIT 1
Secur-itrt- mednsl, emergency ?. fjrp protpction plans
B0072203GB Proviiles summary of 000507-OB meeting ui/utiJs re core melt
accident sequences Utils appear to effect NRC to renolve
problems !< do nothing to mitigate t onsequenieH of Ciass •?
ace 1 dent &
CATTON, 1 California, Univ of, Los Angolcs BO/05/1O 6pp
P Operating license stage documents t< c orrpspondence
8QQ4S404BO ForuiardB .iddl info re review of unreHDlved safety issues,
trip rept of Lessons Learned imp lementiiti on team, (. task
action plan in vitu of high population density aurrounclin-g
plants
DENTON.H R Office- of Nuclear Iloactnr Regulation, Director
BO/04/09 33pp
7030251 Foruards •iociirity t dntingenry plan
Ian withheld IruP 10CFRH 79OJ
AVNE, ,1 P Pui.it! Authority of tlis State uf Mew Vc
729O795 Motific* NHC that 7V1109 !( B002SI rcvisPiJ emergency plans
til becnnit eFFortive DTI 000001 !< p rOieiJiii es to unplement
Ian will beioine effective uittiin -70 dai/f, of pian
FFocti.e flate
AVNE. J P Power AuthontLj ti t the State of Ueu York 60/O7/24 Ip
'tt ju-d i catory correspondence
BOO722B094 Responds to 000609 telcon ro NRC concerns OVBT apsrahllitu
of control room ventilation sys in emergency mode Initiating
air flow fneasuraments in emergency niodo to determine control
room habitability is not in accordance u/actual plani
GRIER.B H Region 1> Philadelphia, Office of tho nii-ortor
QO/OA/11 Ip
BOO7230099 Requests submittal of proposed Tech Spue changes providing
for redundancy in decay heat romov.il capability in all modes
of operation Morfnl Tech Specs uihich mould provide acceptable
resolution encl for guidance
EIBENHUT.D 0 Division of Licensing 80/Oi/ll
731O243 ForiiiaPdE Toinrniss 1 on B00537 ftiemUTandum t< ortfer containing
ecisions nn UCS 7BOS03 pebstion fm reK onEiiieration of
aOIJD memorflniltim A urder UCS 771JOfl pPtition sought action
r fire pi-ntst t inn fnr Electrital tflblps
ISENHUT.DG Dsvision of lirensino BO/Oft/H3 B7pp
S007100393 Summary of BOO520 Technology Eichange Meeting 3 ui/utils in
HBtheEda, MD to discuss accident mitigation faaturBK for
power plants
LONQ, J K Division uf SystemE Integration 00/06/13 75pp
7O9OaiD nrdi'i ijianting e x tt'n-. i i.n until BC1O735 for Commission to
on-sidur ujhethci ^u r PVI em nt AH —536 ** pur t) ana of rtLAQ-Sfil
3YLE.O C nffict of thf Srcrrtai-Lj n (- the Coramissimn BG/07/07
Rccponay m oppuSitloTi to (ISC motion tor disqualification -oF
lairman Hendru- rr UCS 7-'09I7 pi-fcitifn seeking shutdown of
cility Motion- foiled tu slioui hia^ deFjned hy Supreme Court
i Mitfiioui vi. Larlun proceeding
ATT.C M Poinor Authority of the State of Neu York
fANDENBUH&.n I l.onsolidji led Fdlson Co of New York 90/07/OB
80O7140IB2 Submits lept of task force on interim operation at
facilities Rppt includes accident riili consi iterations, social
& economic impart con^iderati ons !. nummary of public
comments
HrtNHrtHAN.E J Office of Policy Evaluations U1CKW1T. L Office of
the Oeneral Counsel BECY-QO-283 BO/06/13 60pp
— BQ071')017O Summariies vieuis of Economic Regulatory Adminl alration. Di v
of Pniuor Supply f< Reliability re electric sya reliability
Impact of operation of facilities as described in NRC B00428
Iti-
HEINFfi, R E Energy, Dopt of BO/O3/15 4pp
'J403ft3 Orrjer granting eitpnaion unti 1 BO0301 for Commission to
Iffct uhpther to review AI.AB-4.1A t. rple-vant noFtiaiiH of
-AB-56I
JVLE. J C Officr of the BPLrelarq of tht CnmTii -,sinn BO/07/10
800.7100103 Feruards Amend 30 to License DPfi-64, safety evaluation t,
notice of issuance & availability
VAR8A,S A Operating Reactors Branch 1 80/06/13 3pp
— 8007100106 Amend 30 to License DPR-6-1, add ing surveillance requirement!
for containment vent !, purge sys
VAROA, 5 A Operating Reactors Branch 1 SO/O6/13 9pp
~BO071i)OUO Safety evaluation supporting Amend 30 to License DPR-64
* Office of Nuclear (tnactnr Regulation, Director SO/O6/I3 A|i
DOCKETED ITEMS
— BOQ71O0114 Notire of issuance !i availabilty of Amend 30 tn License
DPR-64
VARGA.S A Operatlna Reactors Branch 1 QO/Oii/13 2pp
B007O1O11O Notification of aOO(>35 mpeting ui/utils & Saiidia Labs in
Dethesda.MD for presentation of overview of facilities risk
study Agenda end
ISRAEL, S L Reliability E. Risk Asscnsment Branch BO/06/16 3pp
Dl-SHANIHj L N
B007290SBO forward* lornments, i
potcTiliil! in?. iM't KJI 1 1 ty i.i
cooljnt pump supiJUit'i to 1 [H>
Failnro AnalijEfs nut teLhiui
HAVNE, JF P nium rtultioiitij
BOQ711O557 Summanj uf 900530 meeting ui/util in Ilethcsda, MD re status of
action plan
QLSHAN.L N Operating Reactori Branch 1 90/06/23 3pp
BOO701O60B Notification of BOOM 7 meeting ur/utils ill Dothosda. MD to
discuss containment structural response. fa i lure pressures ti
failure modes for Facilities as described in NRC B00410 Itr
to Comm Ed
MEYER. J F Reactor Systems Branch BO/06/2d 2pp
BO071BOO44 forwards Amend 31 to Licensn DPR-A4. safety evaluation &
notice of issuance & availability
i S A Operating Reactors Branch I 60/06/27 3pp
— BOO71BOO46 Amend 31 to License DPH-64, re vi B ing Tech Specs tn add mirJ
cycle insp of nne steam generator t. eno-n f-c yc le insp of
all four steam generators
VARGAiS A Operating Reactors Branch 1 BO/Ob/37 13pp
— Q0071BOD51 Safety evaluation supporting Amend 31 to License r)PR-M
» Operating Reactors Branch 1 UO/Ot/37 "7pp
— BOO 71 BOO 5 3 Notice of issuance & availability of Amend 31 to License
DPH-64
vAROA.S A Operating Re-acton; Branch 1 00/06/27 3pp
BOQ7H1O035 Requests that uti 1 submit revised schedule S. justification
for completion of ATWS mods within 30 days Util is requested
to improve upon Fall 19Q2 completion date totalise oF rlsfc
represented by facility
VAROAi B A Operating Reactors Branch 1 DO/O6/3O 3pp
600721049B "Evaluation nP Impingement Losses of White Perch at Indian
Point Nuclear Station fc Cther Hudson Rivor Power Plants "
VAN WINKLE.U , DARNTHOUSE. L W , KIRK. B L Oak Ridge National
Laboratory FIN 0-O433 NUHEO/CR-1 1 00 SO/fW.IO
B007QB0367 Provides method by uhlch drnvntive action uaE removed from
proportional intcgial derivative control lor per B00616 1 tr.
Item II K 3 1, responding to TM1 -related requirements Feature
eliminated by placing rate control to min
BAYNE.J P Pouier Authority of the "Hate of Neu York EO/07/03 lp
5007170241 Forwards request Fnr addl info re backfilling of severe
accident mitigation Featui BE ReEpnnEK requested uithin 30
days
NOVAK. T H Assistant Dir«ctor For Operating Reactors BO/O7/02
7pp
a00717060fi roriuonK 1C Ir.sp Hi-|.it 10 Pi
CAHLSDN.!! T Ki>gmn I, f'h i ) ,nlr-Lt<M >i
2pp
[tn on IHI iiO'i n;1 in nc
lift 11 f of t IIP In r-ui < n
— BOO/I70A1I It" hiBp Ue(it !Jd ..T^/H'I 04 OT. (IH031 f- 14 fJi> iioni n(n(i 1 l
noted Major ill eo<- ina|iec toj t~in< pr HVI Tit i i,ni p i *i t in 1 1 on
progrjrn pert.unuig to Fire ptoLtrUmi nnitfi in /mniid .'0 1 11
Licenao npn-bQ
KDLTAY.M £j Rug i on l> f'Ji i l.nU-lnli n, l)fnt« a f U.n Dirmtitr
EBNETEft. S D Hpgmr i, t'h i l.iifi' lp h i n- lli-.irti'r f nn" t ri'i t i*)f. i,
Engineering iluppurt ISidiuli QOyoSh/lfi flpp
0007020114 FormaTila 1 r£ livfo Nutnc O()-JrJ, "Hi B.ik ijdijii h !n { on tumni/i I ion
Control ProBT-amn " No iviittoi. rpapiin'ii- icijtiiTD-d
GRItR.II II Rcomn 1 I'Ki l.nlu Jph iri. llffict- of thw l»n»i lui
lp
0007010103 rot-wards IE InFd Notice (JO ,'J, "lost af "ml I inn to t nmr gitnr ij
renduutor Pumps " Ho written ri'ipnn-t1 V4'qiiii«tl
aitlER.n II ncijlun 1, !>l, 1 1,1 il n 1 |j li i n, tiffin- of Lin> Ihi-oitlir
BO/O5/JW lp
0007100111 Forwards ruply tri 11= Ihillclin IKJ -OS IP V.TI uum i tind 1 1 1 nil
resulting in ilrtinngu in hnlihi|i 1 urtb*i ItiiSi'ltb (if ri>/i<iiu il t (J
not identify jjnif rnrrintivo ,ii1inn inqmii'd
EARLY, P J Powrft Author i tij c. f tin- >,r,)ti< u F Mow Vurt I50/0f,/(l'y
"PP
000731099^ Toryarda 1C Infn N.i 1 1 1 « Ufi .'/>, "tv.lUif.lnin of f,t)iilr«r, (,tn
QA ProflruFiis " Nt> uirltlon n.np on o i> t iMjutr*! il
DRIER. H II Region 1, F'h l l.nle l(i h l .1. tllTitr' of Itru- Dirurtoi'
I30/0/./10 lp
dOO71603'JB Porioarda If ItiFo Ndtite flO-JV. 1! nr-nr.trln t inn t) f HnAitor
Coolant I'umji BluiJ! " Nn u|ic>iiin uLtimi ni n^pnii'i.
roquirod
ORlCfl.D H Region |. I'h 1 J ,ul u 1 |.li i „, orfJii- of the Diinttur
00/O6/11 ip
B007170316 Foruifcrde ruiponnff ( n If Unllrrtiii tlO-U/-, "f 119 inourml tuifi'liji
FeeCuro (ESF) f)p6[il r.nntr i.l •, " t\l I -j.ifotij r*l,itud iM[ii tl'miml.
ramalno in ernei g i-nt ij mod p tipon TIMJLI thT f liT nt tu/Jt inn
clgnal eiccpt EIS lisled
BAYNE.J f Powt'l Autlioriti) iH' the '.Intn of New *m k li()/0(./l/
8007230001 Rnquests submittal of appliration for amend to license
consisting of Tech Bpec cltanges & license conditions PUR
Model Tech Specs d Model license conditions Fnr TMI-S
Lessons Learned Category A items end for guidance
EISENHUTiD O Division of Licensinrj SO/07/OS 69jip
0007OB06H7 rorunrda IE nullotui li!) I 'j "I'niSB 1 1, i ,. Inns (if I mai g«nrit
Notifjcatlon Syi (tN'li- W/L OE •. \\t l)Pf.,n.,, Pimior " Mi'lLturr
responso ronuirod
Itaginn J, f>li i 1 ,m« l |iM a, llfPicp of tliu [iirnilni-
lp
B007170S9B Summary of 000625 meeting uj/fic kard P Louie tt Oaf-rick, Inc re
risli study including moilel ing 'for plume trflgDCtory.
containment event tree & modeling. use of plant data &
consideration of eiternal events
ISRAEL, E L Reliability !. Risk Assessment Brunch 80/07/07 9pp
0007030491 ForwdriU If Cii-ulm lit; It.,
Cooling A Motur.tl civi ul« t inn ( Dultl
rcqti ired
OniER.n 11 Rpgirin I, Pli 1 1 ,irio 1 ph i ,r, tlfftt
BO/06/2O lp
BS. nP Iti-arldr Ligolaiil f'tunp
Nn wr l I tun r«v|M)ri«n
tlm Ilii-oelor
B007H30MA Bummary of B005Q7-QB technologv eichangs mDetings (u/ut
in Chicago, IL re core mall accident sequences & associated
phenomenology for facilities NRC perceives mal uroency to
for answers tn kog tcchniral questions
MEYER, J F Reactor Systems Branch -00/07/09 12pp
Q0071SOa97 IfeB|ioniU to IF DuJletvn fi'l tW, "Hijrti amiilui
Oaf i cionc 105 " E.«d.mmAbi«n r.f in n jur I t,il'ie Ot .iwtiuj o
no hudrnmotor ac ti/aliur a Fiirrtis-lioff
UAYNE.J I' Pouor ftublioriltj cil Un> T'tflti> i.f Now Vni k
B007070101 Notification of change in location B00633 meeting D/uttl In
Qetheada,MD to discusc re-eval uotl nn of operational AA
program
HELKE, W L
Quality Assurance Branch 0O/Q7/17 2pp
B0073000'?a Notification of B007P'! maeting u/ritll in netlre»da, MB to
discuss sys interactions sturlij
DLSHAN.L N Operating Reactors Branch 1. BO/O7/17 Sop
8007270730 Forwards Revision 2 to steam generator operating history
questionnaire tt attached supplementary info
DAYNE, J P Power Authority of the Strite nf Neru York BO/07/S3
50pp
orwra* 1C fiircul.u 00 14 "K.^iaarli^ n,r.l,,
Plant DominBralui'il Hutsi 'ins !. FH-fcuHnnt Intpsn.il
Conl«minatinn or l*r>r»uni)cl " Hi lurtLtwn rtitprniBo latiuti
H R»giitn I, Phi l,.iio 1 Ph j.i, (Kfite nP lha n L r er
B007S10JP3
Criteria
oruoid!. Tf- I
No ur 1 1 ( en
.
lp
n> flu ,'0,
\ t-<\<iiruii
DOCKETED STEMS
vnsp proijrsm
BAYrJE. J P POL,
7pp
re'tonse to NFiC request for artill inFo re inservici
Authority of the ^tale of Nou Vorl HO/0&/27
BOO72']()I5(j Forwards IE Bulletin 00- 1 t, "Potential Mi -Lapp 1 1 cat ion of
Rosiidnipnt Inr Murfel-s 1151 '. 1152 Pressure Transmitters
W/Either A or D Clutpuh Coil*'. ' Written resjion'je i equfred
IE Circular BCl-lb also em 1 Mo written responao required
GFUE-fl.BH Region 1, Ph i 1-ad elpti i a. Office of the Director
BO/O6/27 2pp
B007,210W> Responds to IE Bulletin BO-JO re potential noiradioac U VB
sys contamination "i uncontrolled radioactive releases
Actions required hij Horns i !i U I nmpl e tt'd
7.ULLA.E 5 Powei Authority OF the Sit ate of NHCJ Voi k 80/07/03 tp
8007350313 Ark i-sueipt uF BOQ&1J Itr informing NRC oP steps taken to
correct violationb noted in IF-- Insp Rept DO-2B6/79-P9
H lieflitjn 1. PhiladetphiA. Office of the Director
—8007250317 Responds to NPC BOOB 14 Itr re violations no tad in IE Insp
Kept 30-2B6/79-P9 Corrective actions, personnel instructed tn
evaluate survut ] lance results more carefully Program,
instituted to rp^nlva discrepancies
7ULLA.S S Puwor Authority .if the State OF Neui York BD/Oi/13
3pp
— 00072^0335 FnruardB 1R Intp Flept TO -236/7^-39 on 791 125-SOO1 19 R notlcn
of violation
GRIEFI.B II Fleginn L. Ph ( lad p 1 phia. Office of thp Diroctor
HO/O5/11 Spp
--8007250329 IJofirE of violation from map [in 79 1 125-BOOU9
"> Region 1, Ph t 1 adplp h i.ii (JfPice of tti e Director BO/05/03 3pp
8007020115 PNrj-I-aO-09^ on B00617,util uorkeps Union Local 1-2
authoriicd atriko nn H00618 Senior operators are eicluded
flequiTBd IE preetrlko insps have been completed
GREENMAM. E Q , HRUNNEn.E J Region 1. Philadelphia. Office of the
Director BO/O6/17 Ip
0007150031 PNa-l-BO-O9-J on 900634 1 uh 1 1 e performing maint on Incore
detector drives, three individuals sustained possible uihole
bodij radiation eipoeure ft internal k eiternal radioactive
contamination Awaiting dosimetry ripaults
NIMIT7.. R . KNAP'P.P . MA11T1N.T ReoUn 1. Philadelphia. Office of tht
Director BO/06/24 3pp
QQ07OI041S Submits info re 800624 radiation eipoauro in eicesn of
permiEsiblB limits During routine containment entrg to
effect repairs to E drive, repair team withdrew ecvored drive
cable un/incore detector Contamination uiithin limits
ZULLA.S B Pniuer Authority of the State of New Yorh QO/06/2S
3pp
S007010418 Toruarda LER BO-OOA/O1T-O
IULLA.B S Pouier Authority of the State of Neu York 00/06/27 Ip
— B007010455 LEU QO-OOi/OlT-0 on 800il4, mh i 1 a operating at full power,
tost of control room air filtration sys Indicated total
filter fleui above Tech Specs caused by drifting of Allen-
Dradley U02T-A damp- or BIJS balanced
OUMDLE.F U Pouei Authority of the State of Neu York BO/06/27
Ip
B00721OQ19 Confirms B&0627 telcan re otll actions following 60062-1
personnel eipn^urc Incident Approved protedurB for rnaint &
repair of incore flu* man it or ing drive componentt uiill be
Implanirnted by 1900711 5, addl guidance by B007O2
GniER.B H Region 1, Ph tlad el ph In. Office of tho Director
BO/Oi'37 2pp
--B007550J3i' IE Bnsp Rppl SO -2Fi/,/79-E9 on 7V1 t^S-3001 1<? Noncompl iarnCe
noted ffailurp to ev.ilu.tte sur-ypll 1 ancc result* properly t, to
r-Bsolvc d i scrcpiinc 10* noted during containment Insp
KIBTEU.H Boginri t, Ph ilao e I pliia. Ron c tor Operotions Nuclear
Support CranLh REIiELOWSKI T , JDHNS13N, ,J Region I, Philadelphia,
Office of tho Director BO/05/05 SOp p
R Periodic operaling reports !i reliited corroBpcndenc B
80070B0350 ForuaTds 1.ER BO-CO B/03U-O
IULLA, 8 S Power Authority of the State of NBUI York
00/07 /OH Ip
--BOO70003S^ LER 00-OOB/O3L-0 on BCXH.03, uihi le operatina at iOX pouor.
Dutftide pduier to 13B kV foe<lcr uas lost Dieinl generators 32
t, 31 uere activated Caused by tranami ao Jon tower ground load
which fell across feador after b^ing struck by lightning
QUMDLE.F U Poiuer Author-tig of the State of New York BQ/07/QB
IP
EO0717O3fia ForusrUs ''Annual Environ Mnnitnrlng Rept. Part ll flaillological
Bep t "
CAHlLLiW J Cunsnl idated Cd i E on Cii nf New Yorh 80/06/30 Ip
— 80Q717(T!fc5 "Annual Environ MonitnTing R*ptiPart 0 Radiological flBpt "
» Consol i datt'd TdiKon i'a of Hota York BO/06/3O 66jip
8007 1 506fa<> Eubmiln dnilt) PiGh counts from intako ecreens for June 19BO
MQNT1.W A Con-iolidflted Edison Co of Neui Vnrk BO/07/1O 17pp
0007310376 Poruaids rnonthly aptrdtinjj ropt for JUDO 1930
ZULLArS B Poujer Authority of the Statn of Neia York 00/07/14 Ip
— 0007310377 Monthly opcrdtinH rept For Juno 1"JBO
CONNELl.C Powor Authority of the 8tato o^ Now YarH QO/07/OE
API"
8007310473 Forward* utll 80OA13 Itr !, "UiJarleTly Rept on Seismic
Monitoring Nutiuurlt in VicinitiJ of Indian PnlntiNYi
Ccn EH rrn^Bct D&c 1979-Feb I'JQO "
3p .1 P CoD'.olidfllBd Edison Co nP hloui York BO/07/14 San
6007230923 Foruiards "Dajlij Count from Intake Screens For June 19BO "
2ARAKAS, P ConsolidatBi! Eniidn Co of Nou Ynrk 00/07/15 Ip
— B00732Q3£!'i "Ilaila Count from Intake 'ic teens far June 1990 "
* Coniuliriatoil Edlooii Cn n* MPUI York BO/O7/ 1 5 4pp
S fleportable nc cur rtntps, MrOs t- r-olateH carrsspmid ente
BOD4240212 PNO-I-QO-3SA o.l s.impln» from hydrnultc control BIJS BtoraOB
tanks & both main feet pirmps Pounil out of sp»cs for
partifulaten !m rrasr- in maun feed puirm oil mierur, particle
6iie -poiaitlij ill IB to Piltnr ovur load !t bPejluJoun
MCCADE.E . nnuMNEH.F Fle(ilon !. Ph 11 ailelphl a. Of.tce of the
Director- I10/IXV(>7 2pp
6007030355 Forwards LE1 aO-009/O3L-O
7ULLA.S 3 Poucr A.,thoriti| op tha State of New York
Ip
— H0070no36S LEU BC-QO?/O3L-O on 000604. uihi le operating at 100X pauiar.
boric acid tieat trncltig test 3PT-OB Indicated no
continuity an circuit 39 Caused by failed Chramolox 130
volt. 300 matt strip hoalor Heater replaced
* Power Authority of the State of New York 80/07/02 Ip
0007140333 Responds to concerns re control room ventilation ays
oporobiltty in emergency morie noted in LER BO-QQ6/OI-0
Dampers read justed, chare nal Filters replaced & thyroid
dose rate calculations roanaly led
Aj U Power Authority af the State of New York BO/07/03 2pp
DO 0729 00 5 3 HO on B006H4, p 01 sflnnol overeipoaotl to radiation Occurrence
re-enacted flept eipactcrt soon from dosimetry contractor
Intake evaluation comploted Results indicate no exposure in
excess of 10CFR2O 1O3 limits U/D encl
ZULLft-S 8 Pouier Autliofity of the State of NBUI YorV flO/07/il
B007210HB Provides supp lementa 1 info to 800623 b 0711 Uv5 ra 000621
overs iposure. In rusptinae to N!)C roquest Encl table provides
radiation eiposure history In all cases, radiation exposure
IE uibhin legal limits for annual B«posurB
ZULLA.S S Power rtuthurittj of the State of NBUI York BO/07/16
3pp
aOu72900!)R PHQ-I-8O-1O1 on B00713. plant tripptd from 1005C poyer dut
tn water leakage on coolant pump penetrations Possible
damage to coolant pumps t penetrations is being
investigated
RGBELDWBKI.T , MART 1 N. T , UllUNNERi E Region i. Philadelphia, Office
of the DiT-nctor BO/O7/16 Ip
B00731042A Forwards UER BO-O1O/03L-0
ZULLA.S S Power Authority at the State of New York, SQ/07/S3 Ip
DOCKETED ITEMS
97
— 8007310430 LGR BO-Q1O/Q3L-0 on B00639, iuh 1 1 B operating at 100/. power,
Upon completion of trip teat, operator was unable to reset
trip lever on 32 diosel generator Caused by unsecured trip
latch spring having lost attaching screw
PABSMAN.N A Power Authority of the State of New Yoi k BO/O7/38
T Hearing transcripts on non-antitrust matters
B007160429 Forwards Amends 83. B.) t< BO to Licenses DPR-3B, DPR-47 t<
DPR-as. respcc tivel ij, safety evaluation 1* nutlet of issuance 'j
aval labi i i ty
REID, OH Operating Rear toll. Branch 4 BO/O6/12 2pp
--B00716043H AmenflB 83,03 t< 80 tu Licenses DPR-3B, DPR-47 !. DPJ1-55,
respectively. revising Tech Specs to support operation oF
Unit i.' at Full ruled power during Cycle 5
REID,R N Operating Reactors Dranch 4 80/06/12 33pp
B00714OOB4 Unofficial transcript of 800636 briefing on recommends t ions
of Indian Point Taali Force in Washington, DC Pp 1-62
Viewgraphs end
* Cummin si on 30/06/96 64pp
-BQ07160445 Safety evaluation supporting Amen da 83, Q3 I, BO to Licenses
DPR-3Q. DPFI-47 !, DPFI-5S, ritspec 1 1 vely
* Office uf Nuclear Reactor Regulation, D-irector 80/06/13
lOpp
BOQ7240164 Transcript of 8O07I1 public meeting in Washington, DC Pp 1-6
« Commission 80/07/11 6pp
B00723O347 Unofficial transcript of B00717 discussion on Indian Point
in Washington. DC Pp 1-73 Draft memorandum & order enci
» Commission BO/07/17 BOpp
V Operator Eiaminations
8007030303 Not i fine NHC of commitment to enroll employees who do not
futessFully complete any portion of reactor operator ciam
in acculeroted requal if Hallon program Declines to commit
employees to Item B 1 f of NPC B0032B request
BAYNE, J, P Power Authority of the State of New York BO/07/01
DOCKET 50-287 QCONEE NUCLEAR STATION, UNIT 3
F. Security, medical, emergency fc fire protection plans
BOQ70 10205 Forwards sacurity plan re in-transit requirements for ENM nf*
low strategic: significance Plan withhold (ref 1QCFR2 790)
PAHKEflrU 0 Duka Power CD BO/06/24 lp
8007230090 Rettuests participation in study of people-related problems
In nuclear safeguards Study involves collection of data on
licensee security forcis b practices NHC uiEhea to
tntervtcu leturity mgt personnel at Facilities
EIBENHUT. D 0 Division of Ucennins BO/07/11 3pp
0 Adjudicator^ corrHsponduncB
B007 140461 Statement of Board of CommiDsioniers' position in opposition
to raduiaste transportation through Oaston County, NC Urges
transportnt i on via Interatataa 77 !i 85 Encourages expending
*naTgy tc monay for recycling U/corrBspondcnco
M Canton County NC BQ/04/SQ 61 pp
— B00714O473 Forwards addl comments to Oaston County Board of
Commissioners' position opposing spent nutleai fuel ihipmont
through county *• two proposed alternate routes Author dons
not nppote nhipment If adequate safeguarits are provided
OASTDN. H B, Qaston County. NC BO/04/S5 2pp
8007310343 Foruardi Commission Q003H7 memorandum t< order containing
d*cl%ioni on UCS 7 BO 302 petition For reconsideration of
7BQ413 memorandum d order UCO 771104 petition sought action
re fire protection for electrical cables.
E1SENHUT.D Q Division of l.iconsing BO/Ot/33 B9pp
P Operating license stage documents d correspondence
— S0071i0453 Notice of IssuantB t. availability of Amends 93,93 !. BO to
LirensoG DPR-.1Q, DPn-l? !. DPFI-55. respec tivffly
REID. Ft H Operating Reactors Dianch 4 BO/06/ IS 2pp
9007070035 Forwards safety evaluatiun re po^tulatiiil fuel handling
accident inside containment
HEID.R W Operating Rsactors Branch 4 80/06/34 3pp
• — 800707003? Safety evaluation re postulated Fuel handling accident
inside containment
* Operating Reactors Branth 1 BO/06/31 lp
6007020575 Summarizes actions undertaken by util re inadequate core
cooling NRC review of previously submitted operator
guidelines should be completed prior to util committing to
install neui instrumentation
PARKER, W 0 Doke Pouier Co SO/O6/27 3pp
B007080323 Advises that response to HUREG-0667 is in final review fc
will be tubmittud by Q 0072 3
PARKER. W 0 Duke Poiucr Co BD/07/01 ip
B007210004 Foruiards questions re fuel assembly hold down spring insps !<
safety significance of opeiating ui/broken ipringe in core
Request* response uithin 60 days
NOVAK, T M, Assistant Director for Operating Reactors BO/07/01
IBP
B007UOS9fl Forwards application to nmenil Tech Spacs to incorporate
test frequency renuiremants of lOCFRSO.App J
PARKER. H Q Duke Power Co BO/07/07 2?fi
— 8007110331 Application to amend Tech Spec 4 4 1 2 15 incorporating
test frequency i equirements of 10CFRDO, App >J Hiisting Tech
HpBC unacLeptaftJe for oitcnileil cycle lengths for xuoico
current Ji future cycles are/will be licenaeil
» Duke Power Co BO/07/07 3pp
8007H3070B Provides info ro neui oft title* i poti lions !< assig-nincntG of
parsonnel resulting from BD01EB rnorgdni lation nf Ofc of
Nuclear Reactor Regulation
NQVAK.T M Assistant Director For Operating Reactors 80/07/10
Sff
a007I50973 Forwards "Generit Startup Physics Test Program, Jul 19BO "
Rapt supersedes in entirety repts submitted B00i04 & II
PARKER.W 0 Duke Power Co HO/07/ 1 1 Ip
— -BOQ7150393 "Oenerit Startup Physics Test Program, Jul 19BO 1J flept
supersedes in entirety previously submittBd repts forwarded
by 800601-11 Itrfl
« Duke Pouier Lo BO/07/31 14pp
eOO724Oaoa Foruiards B!.W licansens' responBes to 790707 request for
ravlRiu of schedule far installing safety -grade anticipatory
reactor trip for loss of feedmater ti turbine trip Reviau
should be completed by 791113
CAPRA-R A TMI-S Bulletins «( Orders 77/10/34 lp,
B007QB0437 Forwards pra|ioned revision ID Tucli Bpecs t, amend to OL
Proponal claride-. insp reriuirBmonli after primary to
secondary leak upeiifiBd in Tech Spec 1 17 4 Requests that
NRG review !< aupruvo- proposal 1n timely wanner
PARKER, H 0 Duke Power Co BO/07/19 3pp
BOQ7140397 Referi to B00701 1 tr requesting info re insp of Fuel
assembly hold-down springs, RevieuiBd concsrn !< documented
reaulto in 800606 Itr foruiarding RO 50-269/80-18 tt safety
ivaluAtion No further info required
PARKER, W D Duke Power Co 80/0&/OB lp
8007230097 Requasts aubmlttal Of proposed Tech Spec changes providins
far radundancij in dacay heat rnmovat capability in all mod at
of operation Model Tech, Specs which would provide acceptable
resolution end for guidance.
EIBENHUT-D 0, Division of Licensing 80/06/1.1 6Epp
— 9007SBO4DB Propnst-d Tech Spec revision Pago 4 17- 3. clori fy ing insp
requirements after primary to secondary leak
* Dute Power Co SO/07/15 Bff
8007310531 Forwards NUHEG-infcB t- NUREO 1369 detailing devel o-pmunt of
checklist for evaluating majnt test !' talibr procedures
used in nut Sear plants Ack util iiiopcratton in study W/o
*ncl*
LEWIS, Pi C Region 3. Atlanta, Reactor Operations Nuttoar Support
Branch BO/07/15 lp
B007EBOflE7 poruardB propose/d Feth Spec 3 1 P. revision, changlns pressure
temp limita Class I i< 111 license amenj fee end
PARKER, H 0 Duke Power Co BO/07/22 3pp
98
DOCKETED STEMS
--BOO7SBOOO
* Duke P
BOO72BQ544 Fpru
"Trans i ent Fit
temp 1 inn t s
PARKER. U Q lliifce Puuor CL
d Inspection
tspansp to ! ecr>«irnL>ndali ons in NUF1EG-O&&7>
of OlW UesignpU KcjiLtor;, ' Baled on
7Opn
ROO7I70104 Forwards IE Circular 60-14. "(lad loac ti vo Contamination of
Plant Derninurali led Water Sys t< Resultant Internal
Contamination at Personnel " No untten response required
D'nEILLV.J P Region 3. Atlanta. DffiCB of the Director BO/06/S4
IP
BOO 71 BO 533 Responds tn IE Bulletin 79-Q3ft, "Long itud tnal Welii Defects
in ASMF SA-JI2,Tu.pH 304 Stainless Steel Pipe " No Type 300
piping in use far pressure piping Future use of piping will
bo revioufld
PARKER, U Q Duke Ptiujor Co BO/Ofc/24 Ip
GOO7.MO122 Forui,frus IE Inf-u WutitL' BO-2O "Loit, of Decay Heat Removal
Capability <it Oavis-aesse Unit 1 While in Refueling Mode "
No response required
a'RElLLV,J P fliyicn 2. Atlanta, Office of the Direct tir aO/05/OEi
2pp.
BOO72S0112 Abviios that hang or insp re-quired by IE Bulletin 79-13 taas
not addressed in i eaponse to bulletin Hangers visually
inspected as part of response to IE Bulletins 79-O3 J,
79-14
PARKER, IJ 0 Duke Pouor Co 80/06/37 Ip
BOO71QOU.I FoTuarrtE IE Insp Kept a 5O-2;,9/atJ- 1 4, •i<j-2;G,'GO-Q9 tc
50-287/30-09 on SOf)>2B-OSOt No i.onc ompl lane e noted
MUfiPHV.C E Region 2. Atlanta, Rone tor tonwtruc ti on (. Ens i user ing
Support Drancfi BO/Q5./B7 Pf p
--BOQ710015J IE Insp ficpta 30-y69/BO- i 4, bO-27OVBQ-Qr? J< 5f)-2fl7/BO-0.9 on
OOO45C-0-501 Ma nunrortipl lanto noted hlcijot are a a inspected
Fire protection/prevent i Ort
COM I. DM, T £ [legion 3, /it I ant a, Reactor Construction ti Engineering
Support BraiiLl'i Mlt-t-EH.H H Reginn 2, Atlanta. Dtficp of the
DjrBktor BU/(t:>/33 IQpp
Forwards IE Infn Nutico SO-3&. "Oreakdowns In Con tarn I nation
Control Program:, " No written re^pujr.^ renuirtd
O'REILLY, J P Hininii 2, Atlanta. Bfficc nT thu Director SO/05/2B
IP
80072104-59 Foiuards It firtujiir 130-13, "t.Tirl Strap Damnae in
West inghous & F no 1 Assemblies " No uritlori retponse rnqulrB-d
O'REIUUY.J P Deuion 2, M\snta. Offic* of the: "iTBttor BO/03/aB
IP
900701O313 Forujaiils IE Info Notito CO-P3, "Loss op Buttion to Emergencu
FeeduMior Pump& " (Jo uriblcn rpspnnte Toquireit
a'REIULV. J J> Hegion t>, Atldiita. Office of tho DiroctciT UO/09/27
IP
BOO7PSOC)flB Foruarils IE Info tJotice QO-Eft. "Eva 1 uat J on Of Contractor
Qft Programi " No written r«bpunl5e required
O'REILLV. JP llcgion 3, rttlanta, Office at the Director BO/06X1O
2ft
e007010t)i>5 Fortuardi update of info to 79J O2h. 1 lOb. 1SO7 t. BOOI24 Itra in
responee bo ]E Bulletin 7? 14, Itemt 2^3
0 Dukff Power Co RO/OA/ 1 1 6pp
B007l60a'il5 Farudida IE Int-a Nut>ce ftO-27, "Dcgradnt i an at Reactor
Coolant Pump StuJs " Ma spuriFit action or response
O'REILLY, JP
IP
(legion
Atlanta. Office of the Dii-ector
B007O30J63 Fofuard3 IE Oulletiu BO-15. "Possible Loaa of Emergency
NptifUation SIJB tENS) W/Loas of Offslte Power " Written
O'REILLV, J P
IP
(legion 3, Atlanta, Df f I r a of the Director
S007020<lS9 Fcruards IL firtul.jt t!0-l5. "Loai of Flpactor Toolant Pomp
Cooling & Natural Circulation Cooloniun " No ujrilten response
Q'HEILLV,JP
lp
2, Atlanta, Office of the 1>, rector 00/06/30
BO071B0013 rtr* receipt OF 1C Inap Rents 'J(3-2^9/aO-ia, SO-H7O/BO-13 fc
50-307/aO-U on B00513-15 Un propi-i otanj jnFo
PflRHER.W U Dulce Pouer Co RO/06/P3 lp
B0072J0235 ForuardB IE Bullotin 30-16, "Potential Hi aapp 1 ication of
RoEemDUTit tnc Modela 1151 & 1192 Pr us Euro Transmitters
W/Eithor A or D Output Codes " Written roEpnnae 1-oq.uired
IE Circulor BO-1A also end No written response required
Q'REILLV^J P RBQion 3, Atlanta, Office of the Director QQ/Q&/R7
01KI7&2DZ43 Forudrds rooponau to IE Bulletin BO -00 Appro) 33
penetrations concerned Weld defects classified SB inclusion
Ofin repaired for tracking Design meets all requirements of
ASME
PARKER. U P Duko Pouier Co BO/O7/O1 Ipp
BOQ714O4&3 Forwards B007O1 Reuisioti 2 to response ta IE Bulletin
7^-01D, "Environ OualiFi(.a tion of Class IT Equipment "
Replaces previoun submittol d H00319 revision entirely
Includes cnirectlonB of minor errors
IHIEH. A C Duke Pouior Co BO/07/07 36pp
6007350166 Formards response to Items 1 . 2a t. 3 of IE Bulletin go-lli
"Maionrg Wall Design " Lists all masonry walls which are in
proximity to or have attachments from aaf ety-relatod piping
or equipmont
PARKER. W O Duke Pomer Co BO/07/O7 Hipp
3007310130 PriividDi ahippina instructions for deficient steam generator
mainuiag bolts 6Dt aside for independent metallurgical
analysis per NRC 800657 request Reiiucsts notification uihen
bDlta have been shipped
LEWIS, R C Region P. Atlanta, Reactor Operations Nuclear Support
Branch 00/0//1B lp
B Repprtalile occurrences, LERa t, rclotod corTespondencB
000707031? Cnruarils LE'H BO-010/OyL-O
PARRBR. W D Duke Pouiar Co BO/06/30 3pp
— H00707032J LER BO-01B/O3L-0 on CQOtOt. hi nh presBUVo svc water pump B
declared Inoperable due to mo tor cooler tube leaks Caused by
erosion & corrosion resulting from constant flow op lake
water Leaking tubes n)IdBr&d t cooler pressuriled
PHIi-POTT.F T Duke Pouier Co 80^06/30 lp
8007100117 Advises that BOO fa 10 incident involving loss of power to
reactor protection sys Channel B does not constitute RD, at
reported on 800611 Review indicates Tech Spec 331
requirumnntB more n«t Input Puse bleu DUB to loose uilree
PARltr.n,M D Uuke Power CD BO/07/10 Spp
Foruarnu LER SO-OIO/OIT-O
PfiUKER.H O Duke Pouier Cn BO/07/11 3pp
B007H10617 LER 80-010/O1T-0 on BOOM4, at 1OOX full poumr, Increase in
condonGor glr ejector off-gai, count rate Indicated that
once-through sleoro penarator A had developed tube load
Probably caused by meant main steam ntop valve testing
PHILPOTT.F T Duke Pouer CD 8O/07/U lp
—B007150011? Fo.ru,,id!, IE Insp Flcptt
3Q-237/BO-1L1 on ROO513-13 No iioncomp 1 >anc e noted
MURPHV.C E. Ruriton S, Atlanta, Ruattdr ConatTUttlcn t. Enntneerlng
Support Draniti — -" "~
--BQ0715QQ21 IE Sln^p Repta 3O-HA9/00-lfl, SO-R7Q/BO-! 3 t, 30-397/60-13 on
BQ03I3-15 Nn none OBI[I J i ince «ottd Major areas inspected
structural Udncrwte for stajidtiij EJiutdaun facility
HARRIS. J R Region 2. fttlnnta, Uffico of the Dirnclor
CONLON.T E Reniar. 2. fttlanta, Fi-actor Coni.tr uctUn t. (inn inoer 1 ng
Support Oraiuli QO/OS/B.H 3p(i
8007520963 RD on 000709, high pH excursion in oil collection basin
discharge Was discovered Caused by watar discharged from
upper sump of safe shutdown facility const Canst personnel
advised of discharge limits
PftRKER.W O Duke Power Co QO/07/16 2pp
(3007390640 LEn 80-007/01T-0 on B007IO. during normal operati on>, breaker
uhicli sufi]ilies rontrnl pouer A phase of emergency pouer
suit thing logic tripped, due to burned out relay coil Caused
by cotl clearing contract failing to clear
PHILPDTT.P T Duke- Power Co 80/O7/S4 lp
BOO7390633 Forwards l-EFt BO-O09/01T-0
PAIIKER. H o DUUJ Power co 00/07/24 3pp
99
DOCKET SO-SBB REED COLLEGE RESEARCH REACTOR
Q. Inipectlan reports, IE Bulletins & correspondence
QO071SO231 Foi-uardfl IE Circular 80-11, "Radioactive Contamination of
Plant Demineraliifid Water BIS & Resultant Internal
Can tarn in at ton of Personnel " No written response required
ENQEL.KEN.H H Region 5. San Francisco, Office of the Director
BO/O&/24 lp
BOQ731Q163 Forwards IE Insp Rept SO-BBS/SO-OS on 800130-31 No
nontomp 1 lane? noted
BOOK. H E Region 3, San Francisco. Fuel Facility t. Materials Safety
Branch B0/0i/2i 2pp
• — HQO7ai01iB IE Insp Rept 50-290/80-02 an SO0130-31 No noncompl lance
noted Major areas inspected tour of faii 1 ity, eiamination of
logs li record* of survsijs, monitoring & personnel Bipoiure
WENBLAWBKI.F A , CURTIS. J R Region 5. San Francisco. Office of
thtt Director BOOK, H E Region 3. San Francisco, Fuel Facility d
Moterlali Safety Branch BO/Oi/26 4pp
B00702Q651 Reconsideration of c ontentions, ui thdrauino prior Contentions
a, 7, 10 t< 13. modifying Contentions 1, 8. 6. B, "7, 1 1, 14, 16. !i 17
t retaining Contentions 3,4, 13 I, IS Draft nf revised
contentions & Certificate of Svc enLl
8HDLLV.S C Affiliation Unknown BO/06/05 15pp
B007Q2064B Motion seeking eitension of discavory oeriod re Commission
900316 memorandum t< order, CLI -BO-I6, >, RSLB reopanse
concerning hydrogen control contentiuns Certificate of
Bvc end
SHDLLV, S C Affiliation Unknown 80/06/09 9pp
8QQ7010369 Forwards time (, attendance records for Dfc of Nuclear
Reactor Hegulation personne 1, updated through B00419, in
response to UCS Interi-ogatary 210 Copies available in PDF1 &
LPGRs
SWARTZ.L L Hearing Branch 1 BO/Ot/10 lp
HOQ7030Q57 Motion tn withdraw Contention 16 due to negotiation!; u/
licensee uihich solved intervenor concerns re security
Supporting documentation t Certificate of Svc encl
SHOLLY.B C Affiliation Unknown BO/06/10 oDp
DOCKET 9O-2B"? THREE MICE ISLAND NUCLEAR STATION. UNIT 1
F. Socuritui medical, emergency & fire protection plant
80073S0265 Formams York County Industrial Development Corp BOQilO
l-esolution Urges NRC to oipedite reatart of TM1-1
EELL-J J Affiliation Unknown BO/Oi/12 Ipp
QOD70103SB Forward fi Revision 6D of TMI modified amended physical
ancuriby plan Plan yithhcld (ref 10CFR2 79O)
HER9EIN.J Q Hetropol itan Edison Co 80/06/27 lp
8007030244 Forwards 790617 1 tr of agreement bvtuieen Radiation Hgt Corp
h M»t Ed for insevtion into BOO to 1 TMI emergency plan,App C
HERBEIN, J 0 Metropolitan Edison Co BO/06/30 3pp
BOD716D667 Foru»rdi Stat» of PA authori lation For open burning to train
f irof iflhtari
HCKDEIN, J 0 Metropolitan Ed i Bon Co £30/07/11 2pp
8007230993 Forwards revised Fire protection program plan, replac ing
pravlau* plnn submitted Apr 1977
HEHBEIN.JO Metropolitun Edison Co BO/07/11 lp
--8007820.333 Revl«ed firs protection program plan
H Metropolitan Edison Co 80/07/11 Spp
BOO72S0471 Forwards "Independent AsseaBment of Evacuation Time for
TMI Nuclear Pou«r Plant" in responsB to NRC B00510 Itr
HEHBEIN, J Q Metropolitan Edition Co SO/07/ 17 lp
— -BOO7230W3 "lntt*panden t ABSMBsment of Evacuation Ttmee for Thtl Nuclear
Pownr Plonti " Vol 1O Prep»red far FEHA
THOHPaDN,H E Affiliation Unhnouin BO/06/30, 42pp
B007310310 Forward* Buppl 3 to fire protection safety evaluation
supporting dilation of nxtuireiiiRnt to Initall thermal
Insulation on docay heat removal valvei
REID, R M, Operating Reactori Branch 4 80/07/21 Spp
— 8007310341 Suppl 3 to fire protection safntg evaluation supporting
delation, of requirement tu instoll Insulation on dacou heat
removal valv»»
» Operating Reactorn Brancli 4 Bt)/07/Sl 4pp
0 Ad judlcatoru corraipandence
BOO71 40008 RtsponsE in opposition to licensee reply to TMI Alert
B00539 motion to compel follnuinn iliscouery Motion uas Filed
within period prescribed in icgulations for mailing
Certificate of Svc encl
ADLEtl.T A Three Mile Island Alert ftDLFR, T A Uiiloff, Reager.
SclVouiti t> Adler 80/06/18 3fip
— B00714000? Second tet of follouup inlerrogatorlea directed to licensee
Requests uiorv-related accident documentation involving
personal or property injuries Responses to TMI Alert
Interrogatories 3-6 must be updated Certificate of Svc encl
ADLER.T A Three Mile Island Alert ADLER. T A Widoff, Roager,
Selkauiti t< Adlor 60/06/1F) flpp
6007310243 Forwards Coinmisaion B00527 memorandum (< order containing
decisions on UrB 7B0302 petition for reconsideration nf
700413 memorandum & order UCB 771101 petition sought action
re fire protection for electrical cables
EIBENHUT.D 0 Division of Licensing BO/06/33 Bvpp
6007000043 Forwards DCS affidavit of FID Pollard Requests svc on
parties, in restart proceeding
WEIBS, E R Sholdan, Harmon '< Weiss BO/06/26 lp
— G0070B0030 Affidavit submittin!) addl answers to Tourtellotte questions
at RD Pollaiii 800411 deposition States that MRC approach in
800331 response to UCB Interrogator! DS 150-153 is inadequate
d unacceptable Certificate of Svc encl
POLLAHD,!) D Union of Concerned Scientists 90/06/26 flpo
B0070BOMi Supplemental rept on search for suitable TMI-1 hearinfl
facilities TO restart proceeding Identifies three possible
places in Harri sburg, PA Bvc list encl
* Metropolitan Edison Co [JO/06/37 4pp
8007020633 Response in oppnsition to TMI Alert second set of followup
interrogatories due to untimely filing & irrelevance
Argument re application of neu info per ASLD S00505 order 11
w/o merit Certificate of Svc encl
ZAHLEB.R E Metropolitan Edison Co ZAHUER.R E Shaw, Pittman.
Potts S, TrowbridBe 80/06/27 fcpp
B007t404BB Forwards position at Savton County Board of Commissioners,
NC.nppo*ing spent nucl*ar fuel shipment through county fc
two propoiid alternate routes H/o oncl
fiHVNE.O.A ga*ton County, NC 60/04/15 lp
0007010332 Response stating no opposition to SC tiholly BOQ610 motion tn
witlidrau Contention \b re security issues Certificate of Svc
oncl
BWANSON.D T Hearing Branch 1 BO/06/30 3pp
6007830142 Forward* UB08 photographs of exhibit panel featuring TMI
comouter-plotttd land UIB map, JR Mraij 800429 momo re
rmtnrt hearing m«p exhibit needs full siie copies W/o
photo*,
HRAY, J, R. Interiori Dapt of, Oeoloflical Survey BO/06/04 lipp.
6007070378 Forwards PA Emergency Mgt Agency B00104 directives &
c Irculars, suppl to haiard analysis matls ?. "RAC Comments on
Annei E to Disaster Operations Plan," U/BOOS19 cover ItT
M/o attachments Certificate oP Svc encl
CARTER, HH Pennsylvania. State of B0/0t./30 4pp
-BO07230144 ForuordB data outlining Bpeci for prototype haiard
mitigation maps, Comp 1 latlorti uill b* completed by 800 A3 0
URAY, J R. IntsrionDept of, OBoloaical Survey, HO/OB/29 2pp
-8007330163 Forwi»rd» diicrtption of maps for gte in restart hearing
UARDCHCiO ' Environm»nt»l Englneerino Branch SO/05/S7 IHpp
B0070BOQ04 Forwards Poople Against Nuclear Energy request for ASLB
guidance on scheduling of psychological distress issue Svc
to parties in restai t procopding requested
JORDAN, W 8 Sheldon. Harmnn & Weiss 30/O6/30 lp
— B007Q9Q003 Request For ASLB guidance re preparation of case in all so nee
of Commission decision. par present schedule of psychological
distress Issue Issues may be added to end of hearing or
may be HUh j of separate schedule W/Certi f icate of Svc
JOnDAN.M 9 People Against Nuclear Energy JORDAN, W S Sheldon,
Harmon EC Weiss BO/06/30 Spp
100
6007140005 Interrogatories directed to licensee & HRC Requests
technical info re bypass capability around filter unit.
ventilation oys rooi) in NUBSS-OAflO S> restart evaluation
Certificate of Svc end
LEWIS, M Affiliation Unknown BOfOt/30 3pp
OO07O30270 Second set o P interrogatories directed to UCS fiequesta
idonti f i cat! nn of all pertinent info Intended to be used In
intervenor direct rase 6 cro-ss-e laminat ion on Contentions
QUARTZ, 1. L Antitrust; Division
9pp
8007030293 Second sot of Interrogatori-Bs directed to MI Li?wis Requests
identification pf all pertinent Info intended to bo used in
Intervenor -direct case b trosi-e lamina-tion on contention
Demand a statements re gaseous raduaste sys capability
SWART Z,L L Antitrust Division 80/Q7/OJ 4pp
8007030396 SB-CO nd set of interrogatories directed to TMI Alert, Inc
Requests Gpec of alleged violations in safety evaluation b
ident Ificat Ian of all pertinent info intended to be used in
intevvanor direct case & cross-eiamination an contentions
SWrtRTZ, L L Antitrust Division BO/O7/O1. 7pp
B00703O297 Second set aP interrogatories directed to Chesapeake Energy
Alliance Requests statements on MF1C rovieu of separation of
TMI-I ft £ operations b identification of all pertinent info
intend!)* to be used in inter von or direct case-
BHftRT2,L L Antitrust Division BO/O7/01 7pp
BO07230dBO Fol louup Interrogatories directed to licensee Requests
complete narration of event* leading to 000627 accident
Involving leak of to, 000 gallons of contaminated water
Certificate of Svc end
ADLEFI.T A Three Mile Island Alert ADLER. T A Hldoff, Reaper,
Selkouitl b Artier BO/07/07 3pp
BOO7230fcB? Motion to compel licensee response* to second lot fallowup
interrogator IBS Intervenor compiled ui/ABLB B00505 order ro
schedule for discovery based on neu Info Interrogatory S
mill elicit TIBUI evidence. Certif icaba of Svc end
ABLER, T A Three Mile Island Alert ABLER, T A Hidoff. Reager.
Belkouiti & Adler GO/07/07 6pp
SQ0731013-& Response In apposition to NRC second set of interrogator i»o
NRC BBt-abll tABd no jutitif Station for untimely filing
Certificate -of Svc gncl Related correspondence
SHOLLV.S C Affiliation Unknown BO/07/07 7pp
8QQ71&OB94 Forward i memorandum b supporting documents re A3L.B r»o,u*at
fur asalstanc* in obtaining USQS cpacial naps for TMI-1
restart hearing Maps will be distributed in Jul 1980 whin
campleteit U o end
TOURTELLOTTE. J Hearing Branch 4 80/07/08 Ip
BO07230H03 Notion to compel production of licensee emergency plan
implementing document Menus by bihJch licensee Intends to
effectuate plan must be ravieuied
BRAUFORILQ P. Anti-Nuclear Oroup Representing Vorh 80/07/08 Hop
BOO7030E99 BeccnS set of interrogatories dirsttnt to MM Aamodt Requests
statments on technician test performance b identification
oP all pertinent info Intended to be used In intervenor
direct case d crass-eiaminati on an Contentions 3. -1,5 b 8
6HARTZ.L L Antitrust Division BO/07/01, ipp
8007030301 Second set of interrogatories diructed to 8C Sholly Requests
statements on safety evaluation of emergencij plan offgite
manitnring & identification of all pertinent info intended
to be use-d in intervenar direct -cas-e !* ci-osE-examlnation
L Antitrust- Division HO/O7/01 lOpp
3007030302 Second set of interrogatories directed to Anttnuclaar Group
RopreE«nting York RequsetK statements on State of "A
e mergence plan tc identification of pertinent info Intended
to be used in ItLtervenor direct case
L Antitrust Division BO/ 077 01 App
— "007030303 Second Bet of interrogatories directed to Meuberry Township
Requests statements on emergency plan as reviewed
by HRC & identification of all pertinent info intended to be
used In intervenor direct case & cross-e laminatl on
L Antitrust Division 80/07/O1 4pp
— B007S20209 Respansei to NRC aacond set of Interrogator ie* Includes Info
re state plan review, role of local agencies In emergency
response test eierclse li absence of offslte monitoring
devices in safety evaluation
BRADFORD, 0 P Antl-Nticlear Group Representing York, BO/07/OB
Epp
— BQ0722Q217 Reiponsa in opposition to majority, of NRC B007O1 second net
of inleTrogjtoriea due to generality of questions.
Certificate of Svc and
HflADFDRB-0 P Anti-Nuclear Oroup Representing York 80/07/OB,
Zpp
BO072e013O Ack receipt of Itr to President Carter requesting
InteTvenor funding for activities re> restart hearings
Consumer Advocate of PA request for intervenor funding
denied Petition filed on 800930
REIDuR M Operating Reactors Branch 4 90/07/08 Ip
— a0072BOMO Forwards D Hossler Itr tP President re intervenor funding
for reply
nOTHKOPF,C L Energtl.Dept of BO/O1/22 Spp
— 8007030304 Second B&t of interrogator! es directed to Environ Coalition
on Nuclear Power Requests a] 1 pertinent Info intended to b*
uieif in Itibervenor- dirnct case & crass-examination on
Contention* Ha) IcHd) Itl, B & 4 Certificate of Svc end
BCHRTZ.I. L Antitrust Division 8-0/07/Ot 7pp
8007140003 Folloyup iafett| B-valuatlon Interrogator 1 e-s directad to NRC,
re mgt tt technical capanil ity. operational DA pmsrain tv Tech
Specs per IE Bulletin 79-Q9A ref Certificate of Svc &
supporting documentation end
WIDOFF.M P Three Mile ] si anil Alert WJDOFF, M P Wlnoff, fleaoer,
BeUouiti b Adler BO/07/01 llpp
0OO711O324 Memorandum on People Against Nuclear Energy request for ASLB
guidance re psychological stress insue hearing prepuratitin
Preient situation reveals no problem for filing testimony by
end of Get Future t-chedulo mill solve uncertainties
SMITH, I H Atomic Safety and Licensing Board Panel BO/O7/09. Sop
80O714OS34 R.B*pon»e In opposition to Antinucltar Oroup Representing
York 800630 motion for reconsideration of ASLB 900129 order
rejecting Contention IKC) Commission apparently doe* not
intend to revise em-ergftncu tome Certificate of Svc and
ZAMLEft.R E Metropolitan Edison Co ZAHLER.R E Bhabii Plttman.
PottB t Troubrldge. 80/07/09 Bpp.
B0070102ZQ Memoranduffl b order granting eitanslon wntil BOO'7O7 for UC8
to hand deliver safety evaluation dioeovery in restart
protending
SMITH. T M Atomic Safety and Uicensino Board Panel 80/07/03 Hpp
HO07170210 Response to NRC B00701 intarrooatories re restart
proceeding Alleges Inadequate training of potential
radiation monitoring team members & poor callbr
preparedness Certificate of Bvc end,
BHOLLY.B C Affiliation Unknown BO/07/09, llpp,
Clarifies confusion in HRC 000-701 second set of
interrogatories directed to parties Intended to inquire how
safety evaluation will be o&ed In direct ca«? b cross-
examination
9WARTZ.L L Antitrust Division BO/07/07 3pp
BOO717O370 Response to Chesapeake Energy Alliance Interrogatory <f>-9 on
Contention 6 re identification of THI-2 ev*nt sequences that
could, result In substantial reactor coolant loss, H/unslgnad
fi unsubscribed affidavit! d Certificate of 8ve
SMARTZ.L L Antitrust Division HO/07/09 7pp
' set of interrogator ie« re NRC restart
/07/O7 If
1C re neu info
test to
«ter
end
R, Sheldon,
8007230001 Motion for reconciderat ion of ASLB BQQi25 memoranilun l> order
denying TMI Alert motion to compel licensee answers to
interrogatories Info is necessary to determine if pipa
cracking resulted from deferred maint H/Certlf icate of Svc.
ADLER.T A Three Mile Island Alert. ADLER, T A Hidoff, R eager,
SeUoultz b Adler SO/07/10 Spp.
3007300039 Foruiards complete set of correspondence re hearing A BLAB
request for assistance in obtaining speclel maps for TMI-1
restart hearing from 68 Haps being developed will serve as
modi It For OS-tab 1 1 shins base nap requirements within NRC.
BALLARD, R L Environmental Engineer-Ing Branch 80/07/10 3pp
101
BOO7220QQ2 Response in opposition to NRC second set of Interrogatories
\iZ t, a dun to untimelinsss & irrelevancy Certificate of Svc
encl
ADLEfi.T A Three Mile Island Alert ADLER, f A Hidoff, Heager.
Balltoultl t, Adler BO/O7/11 2pp
90O731Q143 Response to second set uf interrogatories Questions
preheater role on filter sy5 as described in safety
evaluation I. restart ropts CertiPicdte of Svc Eiicl
LEWIS, M I Affiliation Unknown 90/07/16 2pp
S0071701SO Response in support of licensee BQ0623 motion for order
rirquirina Environ Coalition on Nuclear Pouer to specify
Contentions B-2 d 2-4 Opposes request for imposition of
sanctions U/notice of appearance & Certificate of 9vc
ORAY.J fl Hearing Branch 1 BO/07/14 -7pp
6007 IB 0391 Response in opposition to TMJ Alert BD0707 motion to compel
licensee responsis to second set of follouon
interrogatories Intervened position re availability of info
is contradictory to prior statements U/Certificato of Sve
ZAHLER.R E Metropolitan Edison Co IAHLER, R E Shau, Plttman.
Potts ti Troubrldge BO/07/14 Bpp
BOO7 180421 Requests lifting of suspension of prehearing activities
Repts an BQ0711 emergency planning moating Revisions made
after briefing & discovery an scope of emergency plan issues
«ay generate addl contentions Certificate of Bvc end
AFTER BRIEFINO Metropolitan Cdlaon Co ZAHLER.R E Sham. Pitfcman.
Pott* It TToubridge BO/O7/14 9pp
0007810487 Forwards UCS objection to second set of NilC interrogatories
Bvc on parties requested
HGIBB.E R Sheldon, Harmon * Ueiss BO/07/14 Ip
— B007210495 Objection to second set of NHC Interrogatories Questions are
not based upon neu info in SGR Certificate of Svc encl
WEISS, E R Union of Concerned Scientists HE I SB, E Ft Sheldon.
Harmon t> Weiss 60/07/14 2pp
— B0072105O3 Second sat of interrogatories directed to UCS Requests
identification of info relevant to Contentions 1-14 u/names
of witnntiet intended to be called
SWART!. L L Office of the Eieeutlve Legal Director BO/Q7/01
Bpp
aOQ71B039i Advises that licensee identified two addl possibilities for
hearing space since 800637 filing of supplemental rapt on
••arch for suitable hearing faci llties, Further delay may
preclude scheduled commencement of hearing in Dct
* Metropolitan Edison Co BO/07/15 3pp
QOQ7 32006 S Memorandum & ordor requesting resumption of prehearing
activitiBB re emergency planning Specific discovery requests
must be made uithin 10 days Objections must be received in
five days from nvc of requests It responses in IS days
BHITH. I W Atomic Safety and Licensing Board Panel BO/O7/1S 3p p
B007310I37 Rept on search for suitable hearing facilities Two addl
possibilities identified in Karri sburg. PA Further
development will be reported Certificate of Bvc encl Related
correspondence
* Metropolitan Edison Co BO/07/15 3pp
Q0071B0394 Motion for dismissal of TMI Alert Contention 9 from restart
proceeding due to deliberate refusal to answer licensee
8QO613 In-ttrrrogatories, Intervenor refused to give facts In
support of contention Certificate of Bvc encl
BLAKE- E L Metropolitan Edison Co BLAKE, E L Shau. Pittman, Potts
* Troubridge 80/07/16 3Spp
BO07S20527 Poruiurds request on behalf of People Against Nuclear Energy
re question of uihether psychological distress contentions
am admlvtable in TMI reitart proceeding
JORDAN.W. 8 People Against Nuclear Energy JORDAN, H, B Sheldon,
Harmon & Meiss BO/07/ li, Ip
— 6007220930 Requests Commission decision on psychological distress
issues. Suggests that matter be first item of business for
neu chairman
JORDAN. M S People Against Nuclear Energy JORDAN, W S Sheldon,
Harmon h Heii> BO/O7/16 7pp
-- 8007220 S 33 Memorandum re People Against Nuclear Energy request for
ABLE guidance Unable to rule uihether filing of direct
testimony by end of Dct uiill be timely
SMITH' I H Atomic Safety and Licensing Board Panel 30^07/09
3pp
SO0722OS62 Advises that, dcsp t ti
InterTogatories.NRC i-ospansoi
t ASLB on BQ073S
SWARTI L L Antitrust DiviBi
late receipt of UCS third set of
mill be hand delivered to UCS
2pp
QO07320964 Forwards Siigned affidavits Identifying authors of NF1C
response to Chesapaake Energy Alliance In turrogfltorij i-9
BHARTZ, L L Antitrust Dlvisinn BO/O7/17 3pp
8007330321 ReaponaH in opposition to TMI Alprt BOO707 fnllouup
IntBrrogatories re^ B00627 leak of contaminated water
Relation to remaining contentions not ghuuii Certificate of
Svc encl Related c orrespondence
BLAKE, E L Metropolitan Eililnn Co DLAKE.E L Shau, Pittmam Potts
fc Trouibridge BO/O7/I7 5pp
6O07330500 Response to MI Leuiis 300630 Interrogatories rn SER Includes
explanations on absence of investigation re lach of
auxiliary blig ventilation sys bypass Affidavits, prof
qualifications & Certificate of 5vc encl
SHARTZ.L L Antitrust Division BO/07/1B 15pp
8O07230SOii Forwards licensee respnnBe to intorrogaton os re THI-I
restart Related cnrrespdndBuce
E Sham. Pittman, Potts t. Troiubrldgo BO/07/1B Ip
— BOO7H30314 Renponse tn Intorvenor Ml Lewis int&l-rogator tes on
O6BO, "TMI-1 Restart Evaluation " Related correspondence
ZAHLCR.n E Metropolitan Edison Co ZAHLER.R E Shau. Pittman,
Potts L Troubridge BO/07/1B flpp
9007330610 Response In opposition to Antinuc. lear Oroup Representili}
York (300707 motion to compel svi of emergency plan
implementing document Motion inconsistent u/production
groundrules Certificate of Svc end
ZAHLEfl.fi G Metropolitan Ellison Co ZAHLER.R G Shau, Pittmon,
Potts t. Trouibridge 90/07/1B 6pp
8O07330604 Response in support of People Against Nuclear Energy B0071A
request for Commission decision on psychological distress
issue Urges striding Section III of motion re opportunity
for raply briefs Certificate of Bvc one 1
TRDWBFtlDQErG F Metropolitan Edison Co TROUGH I DOE, G F Shaiv,
Pittman. Potts «. Troiubrldgo 80/07/21 5pp
6007 23 Oi 09 Foruiards ML Jensen B00721 affidavit ru NflC
BC Bholly safety evaluation Interrogatories 9-10
BWARTZ.L L Antitrust Division BO/07/21 3pp
responses to
— 9007230614 Respnnsa to SC Bholly B00i30 IntDTrogatorieB on restart
safety evaluation re steam generator level instrumentation
designed to mee-t safety grade requirements & other IBIUHS
Af f idavi ta. pr-of qualifications l< Certificate of Svc oriel
fiHARTZ.L L Antitrust Division BO/07/31 33pp
— ~BOQ7B30il7 Response to TMI Alert 000701 follouiup interroBatories re
lafutij evaluation Etplains suggested changes re improvad
mjt capability & technical eiaerliae C-crtif icate of Bvc
one 1
BWANBON. D T Heaving Branch 1 80/07/21 SOpp
BOQ725O446 Forwards A5LQ B00751 subpoena directed to R Fennimors of
WQR-TV Ack reqifaated
SMITH. I U Atomic Safety and Licensing Board Panel 80/07/21 Ip
— B007S50492 Subpoena commanding R Fennlmore of WQR-TV to appear an
behalf of TMI Alert, on BOOBD* in Gethesoa, MD. re Fcnnimora
,800384 television interview
SMITH, I H Atomic Safety anH Licensing Hoard Panel 00/07/31
Ip,
B00729O779 Response to NRC interroflatorie-s based on safety evaluation
Submits items supporting allegation that licensee is not
tachnically qualified Intervenor will rely on current
financial statements re Contention ft H/Certificate of Svc
HIDDFF, H P Three Mile Island Alert WIHOFF-M P Midoff. Reagor,
SeHouiti l< Adler BO/07/S1 <7np
BQQ7S3Q5B3 Rttqu«st» that A8LD issue subpoena to HDR-TV for tape OT
transcript of "What's Happening. America " Program broadcast
on B00324 tc revealed facts re util malnt practices
C*rtifltat» of Svc encl. Related correspondence
ADLER. T A. Uidoff, pteager. Sellioulti k Adler BO/07/ 16 3pp
B007H304Sft Memorandum fc order ruling on TMI Alert 800707 motion to
eomiial li tense* responses to interrogatories Interrogatories
1.3 b 1 must be ansuiered uithin 15 days Interrogatory S need
not be answered
SMITH, I W Atomic Safety and Licensing Board Pane) BO/07/23 3pp
DOCKETED ITEMS
>7.39 rlmnarimilum advising thnt AMD SO0715 memorandum ti order has
purpnoB at no I Lino ocopo of Comnl S5 i un discovery
irity tr DBtob 1 i shlng BLhodulp far litigation of
lency planning isnuos
1,1 W fttumiL 'Safety and llti'nsitig UniiriJ Panel 00/07/23 2pp
B0071BQ151 Responds to 8003 L 9 1 tr re delay in piecing TMI-1 back into
svc Public hearing scheduled to begin Fall I960 to determine
uih other facility should be oparatod d untfer uhat conditions
Questions re nuclear R&D activities should be sent to DDE,
REID. R M Operating Reactors. Branch 4 80707/09 lp
)b& I Foriunrd-s dncumontG sent l<i SC Qfinlly In response tp QOOA30
rrnga tdri.es Cnpicii avoilfible In Locnl PER Ufa cnr 1 s
FI.I- L Antitrust DlvUion HO/OV/Hfl lp
— 3OO71B016O Eipresses support for nuclear power to replace imported oil
t< uro.BS expediting return a? Trtl-l to svc
RIPLEY.U 1 Affiliation Unknown BO/03/19 3pp
)4J7 Rn&jujin-e in oppnsltloii tu Till rtl DI b B0071O motion Par
isidorjitlnn a f A!JLI1 iSQOfjHS order denying inturvcraor
in to compel Affirms licenced OUO511 !i 060<l responses to
\lert dlBcnvorg t< nation tn tnmptl W/Cortlf I rate of Svc
;,C 1. Metro fioH tun Edison C.o OLflKt. C 1- Eihau, Plttouin,
iOpp
031^ Tur-uardi II Hi Ivor, HI! KaimlB-JW Oilrnij !. FFJ Al]on«pacli
dovltn d prof nualif tcnlloiis re NHC B00721 respond to
Mart Follouup intnvpOflritur i en
iuN. t) T Hoar I (in Branch 1 BO/O7/2S llpp
>313 Keanondc to UCFi tliir*! ant of In ten-nan tori BI re neu Info In
ty BViilujition Fuiuli onal teal not eipDCted prior to
ing Adoquatn m*nn» for pr*vmitlon of steam aennratDr
fill domonBtro tod W/n P Ptdavi to % Certlficata of Qvc
TZ.L I- Antitrust D-lvtolon BO/O7/BO IHpp
03H3 HetponOt to flOOS^O Itr ra f)C Anma c Due ems About ilolays in
Illy TCI tart Commission V70SOV order iilent 1 fiBB itnmn
miiBt ba renolved prior to pontnrt Tlmo required to
Ive (torn* uill doing r BE tort until Iflto 19E10
CHER.C OfNc» uf ConsjrBiilonal Affairt
1324 ltv-»npnill to E30Q-414 Itr re CM Levenu toncprni about utll
iclal conclUlon PA fob lie Utili ComralsilDii aliDuld be
acted DnelviDit nn Puclltlij rnBtAiH could not, da vipacted
r* «ni) of 1109 du* to procnodlTi-g scope k other fnetors
sREfl.C tlFfllff of Cpr^oe-e*Bional Affjin (3(J/O1/hlS 3\ij>
O343 HB»flond» to 1)00114 Itr re I" Clorli concernc about util
icinl condition PA Public tftils Commlaslnr sliould bo
acted Decision on facility rnBtmrl, could not ^* «ip«rt*d
re ci\a at l"/BO due to proc pail iti-g (.cope t< other factors
;nrR,C Clfflcp of CDno«-**«1.tinal Affairs BO/Ofl/10 Bff
MHO H»»poiid i to Itr ro Sf ArgubTight contsrni About Jelays in
lily r»stflrt Dec i« ion on reilart utll nut ba mntia until
I9EID due In tiffliB TBHUired tn ccmplat* tun 1(6 re
luicn 7ciQBQV urdar
ERCn.C tlffite of Cui^r optional APfviira ao/OS/OH Spp
3108 Se»pundi to OOOTai iujcst lon,» ri> (io*alble flmncia
tit FlnaticiJil Pailurp provUeii ground) Cor Immoit intti
cation op HcirnKB Contingoncj pinna under dovolopment
•111 «ii»Lir<j protection nt public honltft
HNE.vl F Cumin! »a Jan HO/09/0? Spp
OfiOS Urg»» WHC approv*! of venllns at Trtl
,A A AFfillaLlaii UnKnaun GO/OHi/01 lp
OQSt Urgei clpcdUiau* restart of Pncllltij du« to eanUnuDU*
ease of pnuor coil ruiulLIng from indue 1 »i PUB t< delay*
9TEH.CP AfCtHatlon Unkrmwn PO/0/i/HI lp
0013 Urges afPoi-U lei re»lni-t unit at nnrly iT*H» due to
pBt> approwld bu P/i Pub lit Util Commitslon for Mpl Ed
omari
INOCfl.C W Amii«t|gii Unknown 80/DA/2£i Hpp
03B3 RnuiujTidt to BODb03 Involrn & Poruiardu
»r 1*79 to Jlnr 1900 par ltKTRi70 H/o end
EUJ,J 0 rioti-DpoltUn ITdlian Co 00/07/02
in«|» fen* for peric-d
OOP) Raiponilt to 000612 )tr forunrdlng rvcant rvaolublon adopted
ort County IniTu»trlal Duvilopm^nt Corp advocating return
•tilltg tn avdllenring ordered tn dattrmlna whaLhar
Utij i-tioul-J b# operating b undar vint cflnJitlona
ON<l[ K, OCMc* ot Huetear ir«actur Regulation, Director
7/OB lp
3200B3 Forwards p*iolgbion unamimnualii **opt«d by York County
duitrlal Orvilnpmvnt Corp nit 000*10, n«*nlgtoion urg»i NRC
upsdtt* r»turn of facility, to *vc
LL.O J York. PA SO/Oi/lH Cpp
BOO71SO4S7 R&apnnds to 800623 Itr re restart at TMI-1 Public moating
scheduled Por Fall 19BO to determine uhBther facility should
be operated & under uhat conditions NRC primary
ruup onait i 1 itij IE aaeurancD of public health & safvtu,
RCID,fi M Operating Reactort Branch 4 90/07/09 Ip
— aoO718OflAl Oueationn uiheti TMI-1 uill ba allc-ued to rastart fr uhat is
required of util Utj NRC
E Affiliation Unknown 90/06/32 3pp
B007B 10084 Forward a NUREG-0571 & tJUHEO-O634 in response to r*qunt
Adviaea tftat App A to NUFIEQ-73/OB7 do»e not esist Several
Individual SAHs idontififfd in SRP havn App A H/o encla.
80UDER. J L Division of Rules and Records BO/07/O9 lp
QOQ721OI2I fl&aporils to 790709 Itr to NRC re concerns about facility tr
actions being taken bif Canc«rnsd Citiietis of Londonderry NRC
ham ordered public hearing to determine whether Unit 1
Bhould" he operated Unit 2 feasibility studies are underway
SNVnEFt, D J TM1 Program Office BO/O7/O7 2pp
— 0007210101 Enpreases appreciation for 7 "7 0629 visit to Hidd letoun. PA
CtmcBrnuir Citiians of Lon-donclflpryj uho have coll»ct»d 73O
5 i anatuTesi are dedicated to closinj facility NRC status
ro-flts uould bo of great benefit to area residBnt-s
8THEET.P A Affiliation Unknown. 7^/07/09 Spp
0007330320 Respondi to 800401 Itr to PreildeTit Carter *lpr*i*ing
conc-arnn over -financial impact as stockholder u/liccn*** KRC
li concerned u/ economic impact Respontibil I ty is linlteit to
public, health fc safoty
R H Operating Reactors Branch 4 8O/O7/09 Spp
(1007330344 Responds to end SOO3O2 Itr to President Carter re delag In
returning TMI-1 to svc NHC has nrdareil public h»aring \a be
enrulucted to determine uhetJ>pr facility should be operated
tt if soiuniTer uhat canilitloivs
REID. R W Operating Reactors Branch 4 BO/O7/09 3pp
SD07B-4Q3S4 Rvsponds to BQ03H6 Itr to PreEident Carter requtating that
facility be re turned to sve Public h oaring re lnu»s to
«s9urr public fiealth & safety ccheduled for Fall 19 SO. NRC
reviau of technical isnuus underuiaij Ltr eric 1
REID, R W Operating Reactors Branch A BO/07/09 3pp
O007E4O371 Reap on if a to S00328 Itr ro delay in returning facility to
ivc Public hearing scheduled for Fall If BO re Issues
appropriate to assure public health t< safety NRC ravlau of
technical issues underway Restart not eipe-cted before 19B1
REID, R y Operating Reactor* Branch 4 80/07/09 lp
— 0007240370 Requ&Hts that facility bs- returned to BVC
E3ARTMAN.V Affiliation Unhnoun, BO/03/SB If
B00734037S Responds to 500339 Itr to ProBident Carter re delay in
ratuTning Paeility to «vc, Public hearins re Issues to aiiure
public health (. safnty scheduled for Fall 1980 NRC reviuu of
tochnical lssu«s undnrulalj Ltr encl.
J1EII>, R H Operating Reactors Branch 1. QO/O7/U9. Spp
B007PJlO39a Responds to BO0321 Itr to PrsiTiidBnt Cartar re d«la« in
mtun-ninu Pacilitg to svc Public h«arinj FB iosu»s to asturt
public health tr safoty scheduled for Fall 19BO NRC review of
technical issue » undoruay, Ltr encl
W Operating Reactors Branch 4 80/O7/09. 3pp
B0072-4O401 Responds to BO04HO Itr re doUnj in- returninc) facility to
svc Publlt hearing scheduled1 for Fall 19BO re issues
upprnpr-Jfltfr to as»ur» public health fa safety NRC r»Vi«w of
tochnlcal Isnueo undaruiay Restart not e»pstct«d befor* 1981
H Opej-Btlno Roactot-s Dranch 4 BO/O7/09- lp
— 0007340*13 Urges that facility ba returned to svc.
DIHK.H Affiliation Unknown BO/O4/01. If,
BOQ7i3'SQ4ia R«sponds to B0043O ttr to Pr»«l«tent Carter r* delag in
refcurnino Facility to »vc, Public hfl»rinu re i«sue< tp a»»ur»
put-lie health t, s»f«ti( schnrfulnd fflr Pall 1VBO NRC r*vl»ui of
technical issues undffruay Ltr encl
REID. R W Operating Reactor* Branch 4- BO/07/09. WPP
10,
8.QQ7240416 Responds to BOOSOi Itr to president Carter IB delay in
returning facility to svc Public hearing re issues to assure
public health ti safety scheduled far Fall 19EJO NRC reviey oP
technical issues, underway Ltr end
HEIDiR H Operating Raactors Branch 4 BO/O7/09 2pp
-8007110030 Executed Amend -i to Indemnity Agreement B-64, -chang ing
of Financial protection
SALTZMrtN.J Antitrust !, Indemnity Group ARNOLD. Fl C
Metropolitan Edison Co 77/05/2G Spa
8007210419 Responds to 800333 Itr ID President Carter re delag in
returning facility to avc Public hearing re issues to assure
public health h safety scheduled for Fall 19BO NHC review at
technical issues underway Ltr and
REIDiFl W Operating Reactors Branch 4 SO/07/OV Hpp
3007340123 Responds to aOOHSi Itr to President Carter re delay in
returning facility to svc Public hearing re issues to assure
public health 81 safety scheduled for Fall 19BO NRC revieu of
technical i SSUDB underway Ltr end
REIDiR U Operating Reactors Branch 4 00/07/09 3pp
8007240428 liifsponas to QOO31B Itr to President Carter re delay in
returning Facility to svc, Public hoarlng re issues to assure
public health I> safety scheduled for Fall 1980 NRC revieu of
tachnicat issues underway Ltr end
REID.ft. M Operating Reactors Branch 4 SO/07/0? Bpp
H0073000Ot Respond* to Itr re accident at TMI-H Public hearings will be
conducted to determine uhither Unit 1 should be operated &
under what conditions Licensee has nut submitted prupasal
for over-all plant recovery for Unit a
BNVDERiB J TM1 Program Office BO/07/09 2pp
-BOO7110032 Eietuti'rt Amend t> to Indemnity «greeinent B-64, Chang itig
license numbere
EALTZMAN. J Antitrust !. Indemnity Gi oup HERDE1N, J 0
Metropolitan EDison Co BO/G2/24 lp
-B007110Q37 Amend 9 to Indemnity At
f inane till protect! on
BALT2MAN.J Antitrust J, Indemnity Gruup
nt B-64. chang ing amount of
79/05/01
2pp
-BOO7IIOOHO Executed Amend 9 tn Indemnity Agreement D-64. modi f uing
prefatory language of Paragraph 3, Article l,re course of
transportation NELIA Policy (facility form) end
SALTZMAN.J Antitrust •< Indemnity Grnup HEHBEIN, J ft
Metropolitan Edison Co 00/01/03 5pp
-BOO7H0016 Endorsement 2 to NELIA Policy NF-220 designating annual
premium Declaration end
» Nuclear Eneigy Liability Insurance Association 79/01/13 2pp
-B007I1O05! Amend to Condition 4 endorsement tu NELIA Policy NF-S30
Constitutes Endorsement 2
MARRONE.J Nuclesr Energy Liability Insurance Association
73/12/14 lp
B007B80iH4 Responds to B00il9 Itr to J Ahoarne re resolution adopted fc
commantB re TM1-1 restart NRC has ordered that public
hearing be conducted to determine if facility should be
opera tod S, under uhat conditions
DENTON.H. a DffiCB of Nuclnar Reactor Regulation Director
BO/07/ 10 lp
B 00 72900 31 Responds to BOOilB Itr to CoramlBBioner Hendrle urging
expeditBd proceedings to return TM1-1 to avc Development of
record re r&start la not eipected before early 1981 Primary
Cammlssl an responsibility is far public health
D EN TOM i. H R Office of Nuclear Reactor Regulation Director
00/07/1 A lp
— B007270O3S Urges NRC to expedite prDceodings on TMI-1 on behalf of
constituents serviced by JCP&L Raquests are prompted by
rate hike*
QALLO. D A NULJ Jersey State of BO/06/ IB Spp
8007310393 Urges restart of facility
ADAM, L D Affiliation Unknown SO/07/ 11? lp 1
8007 3 103 90 Requests action in restoring svc to facility Economic burden
to electricity ugera has been substantial
LAhTE, W F Ecolaire Condenser. Inc 00/07/ai lp
B007310373 Forwards MB Hayden B00717 Itr urging facility restart
Request* reply
OOODLINQ. 0 House of Rep BO/07 /SS 3pp
I. rinancl jl information
800715073O Confirms BOOdHA telcon t foruiards graph tllu«trating market
price at General Public Utils Corp common stock for period
Jan 1979 to mid-Juno 19BO
HOHflDH. T Q Oeneral Public Utilities - OPU Service Corp BO/06/26
J Iniuranca t* Indemnity Information
H007110O11 FDIA request for all indemnity agreements, insurance
policies- & associated info between util.NRC b/or A EC re
facility.
KEARNEY, R. W Affiliation Unknown BO/03/39 Spp
8007UOO09 Itespond* to FOIA request for all indemnity agreement*'
Insurance policies b at»ociateit Info between util'NRC b/or
AEC re facility For war da documents listed in App A
FELTON. J » Division of Ruloa and fiacords 80/06/23 7pp
-8007110052 Amend to NELIA Policy NF-220 Cunstitutes Endorsement 4
MAIIRQNE.J Nuclear Energy Liability Insurance ftss-dciation
73/12/14 ?pp
-9007110057 Amend to industry credit rating plan premium endorsement to
NELIA Policy NF-2SQ Constitutes Endorsement 5
MATJFlDNEiJ Nuclear Energy Liability Insurance Association
73/13/14 Spp
-B00711Q060 Endoi aemunt 6. waiver of defenses endorsement i END), to ftELIi
Pol Iry NF-32O
HARRDNE. J Nuclear Energy Liability Insurance Association
73/ia/!4 2pp
-0007110062 Endorsement 7 to supplementary endorsement uaiver of
OBFeriBOB for reactor const to NELIA Polity NF-220
MAHHRNE. J Nuclear Energij Liability In^uriSntc Ass-oc i ation
73/13/14 lp
-B00711006B ftmend to Insuring Agreement IV of NELIA Policy NF-3EO,
"Application of Policy " Constitutes Endnrsument Q
HftnnONEi J Nuclear Energy liability insurance Association
73/1 a/ 11 IP
-8007110072 Amend to advance premium t< std premium endorsement of NELI
Policy NF-22O Constitutes Endorsement 9
MARRONEiJ Nuclear Energy Liability Insurance Association
73/13/14 lp
-B0071 10077 Endorsement 10 to advonre premium t, std premium endoraemirn
u/changes in subscribing companies !. proportionate liability
endorBement to NELIA Polity NF-320
MAFRONEiJ Nuclear Energy Lialiility Insurance Association
73/11/01 lp
-B007110094 endorsement 1 1, assignment of interest In return premium &
in reserve premium reFuiidi to NGLIA Policy NF-290
HARFIONE.J Nuclear Energy Liability Insurance Association
74/07/13 app
-BQQ7UOOB7 Amend to Condition 1 enooi sennBnl tn NELIA Pnlicy h)F-a20
Constitutes Endorsement 12
MARRQNE.J Nuclear Enerqy Liability Insurance Association
74/01/13 1(1
-BO07H001?! Amend to Endorsement IQ.advrtnco premium >, ltd premium
endorsement of NELIA Polity NF-2SO Constitutes Endorsement
13
MARRONEi J Nuclear Energy Liability Insurance Association
74/02/15 lp
-B00711OQ17 Confirm* that JJEUIA ha» bound insurance Policy NF-320 at
limit of one million dollars issued to Hat EdrJCP&L b
PEPCQ covering facility Includes policy site description,
OUATTRDCCH1, J Nuclear Knerou Liability Insurance Association
73/13/06 lp
-B0071IOOBB E<ecut«d Anend 3 to Indemnity Agr»emnnt D-64. changing amount
of financial protection
5AI_TZMAN,J Antitru»t I. Indemnity Group 79/04/0-1 2pp
~B007HOO?3 Amend to address of NfcLIA enUorsement to Policy NF-230
ConBtitutea Endorsement 14
MftHRONE. J Nuclear Energy Liability Insurance Association
74/03/13 lp
-S00711Q09B Endors«ment 15 to NCL1A Poliry HP -2SO. increasing l
limits
MARJ10NE.J Nuclear Energy Liability Insurance Association
74./Q4/2i lp
KM
DOCKETED ITEMS
— -6007110103 Amend to Endorsement 13 tn advance premium fc std premium
endorsement oF NCLIft Policy (JF-SSO Constitutes Endorsement
16
MARRCNE, J Nuclear Energy Liability Insurance Association
74/0-1/26 lp
•DOO711D201 Amend to Endorsement 34 to advance premium b std prs-miun
endorsemsmt to NELIA Policy NF-220 Constitutes Endorsement
35
BftRCES.C K Nuclear Energy Liability Insurance Association,
78/03/04. lp
— 0007110107 Amend oP std premium endorsement n/chang-os in subscribing
companiBS t: proportionate liability etuJnrsoment Constitutes
Endorsement IB
BAHDE5.C II Nuclear Energy Liability Insura-ncw Association
lp
-BO071 10208 Amend to advance premium b std premium endorsement 6 amend
of Cnndition 4 endorsement to NELIA Polity NT-SSQ
Constitutes Endorsement 36
BARDEBj C R Nuclear Energy Liability Insurance Association
79/01/O3 lp
--B00711OJ23 Amend uf Condition 4 onrinriemtnt to HELIA Policy NF-2SO
Constitutes Endorsement 19
DAPDES.C fi Nuclear Energy Listjilltj Insurance Association
75/01/01 lp
— S0071I01EO Endorsement SO to NEUIA Polity NF-32O, Increanns limit of
1 lability endorsement
DADOES. C R Nuclear Energy Liability Insurant* Association
75/03/SJ lp
— SO07 110102 Amend to Endorsement 1 H of advance premium fc std pi-omium
endcrBaniEnt to NEL1A Policij WF-320 Constl tutes endorsement
91
DAfCD-ESi C ft Nuclear Energy Liability Insurance .Association
73/03/21 lp
— BOO7110212 Amend to Endorsement 39 of advance premium ti std p
endorsement to NELIA Policy NF-230 Constitutes Endorsomsnt
a?
BAIIDEG.C R Nuclear Energy Liability Insurance Association
lp
BO07110S17 Endorsement 30 to NELIA Policy MF-S30, D/ihana»» In
subscribing tompaniea 6 proportionate liability endorxnant
8ARDES. C Fi Nuclear Energy Liability Insurance Association
79/01/2O lp
DO0711G222 Amend to Insuring Agreement 3 to NELIA Policy NF-22O
Constitutes Endorsement )
MAUHDNE. J Nuclear Energy Liability Insurance Association
73/12/14 Ip
-9007110133 Amend to Endorsement 17 of ad van to premium l< ltd premium
enilori-emBnt to NELJA Policy NF-230 Const* tutors EndorBement
35
DARDES, C R Nuclear Energy Liability Insurance Association
79/01/93 ip
-0007)10140) Endoriewent 33 to advance premium t, atd premium endorsement
to NELIA Policy NF-220 u/c hinges In sub s-crib Ing eompanlei !<
proportionate 1 iabill tij endorsement
BARDEB'C R Kuclear Enersij Liability Insurance Aiso-ciitian
75/IB/01 lp
-B007I101-43 Amend t(? EcidDVicmont 23 tn advance promlum ii atd premium
endorsement of NELIA Poiity NF-SBO Constitutes Entlorspmant
BARDESi C
7&/O7/0?
Nuclear Energy Liability Insurance Association
-0007110147 Amend to Condition S. insp fc suspension. to UELIA Policy
NF-2SO Cons ti tute-i Endoriomen t £26
DAItDES-C R Nuclear Ene-rgy Liability liuurance AssDClation
76/12/15 Ip
-ao07tl0224 Amend to addreBs oP NELIA Endorsement to Policy MF-220
Constitutes Endornomert 3
HARROW Ei J Nuclear Energy Liability Insurance Association
73/13/14 lp
0007110043 Endorsement 1 to NELIA Policy EB~i3
• Nuclear Energy, Liability Insurance Association
78/09/lfl lp
BQ071B0404 Responds to 80 Oil 3 request for addl info re compliant*
u/financlal protection provisions of Atomic Energy Act
Forwards proposed Endorsements 43 & 44 to NELIA Policy
NF-aao
HEdBErN, J Q Metropolitan Edison Co 00/07/14 App
8007320534 RpspOTlrfs to NRC S00il3 Itr re compliance u/Plnancial
protection requirements Proposed endorsement provides max
protection available From private sources Restoration of
limit of liability endorsomunt encl
HERQEIM.J.D Hu trop ol i tan Edison Co BO/07/14 7pp
P Operating license stage documents & correspondence
-00071 101S1 CTirtorsemEUt 37 tu ujaivpr oF d^Fense* endarsement (ENO) to
NELIA Pol Uj NF-230 Constitutes Endors-ement 27
BARDESrC R Nuclenr En^rgij Liability Insurance Atsoclatlon
76/12/13 app
-BQ0711Q196 Amend to ilefinltion of nuclear onergy hflinpfl to NELIA
Policy NF-22Q Constitutes Enilnrsement SB
uARDES.C FI Nuclcnr Energu Liability Insurance Association
76/13/13 lp
-H007110160 En-dnrseraiBTit 27 to advance pronlum !< std prc-mium B-ndorsomDnt
to HELIA Pollc« NF-320
DARDESiC R Nuclear energy Liability tmura-nce Atoociatlan
76/12/31 2pp
-9007110167 Amend tp CunditiQn fl !. nmend in 1977 subecr i blnj) codip-anjies fc
proportiDn.it* liabililty nTidprsemont to NELIA Pollcij MF-220
Constitutes Enifnraement 30
QARDES.C I) Nuclear Energy liability Insurance Ansoc I atlon
77/01/3! Sff
-3007110173 Endursernent 31 to NELIA Policy Nr-230, Incrosai ng limit of
liafill i tu endorsement
« Nuclear- Energy Liability insurnnco Assfltlation 77/03/O6 If-
-8007110176 Amend to Eridiirsemeiifc S9 to ndvance premium l< std premium
endorse^Ent bo riTLlA PtiUcu NF-320 Constl tu-bes Ertdornemanfc
33
BARDES.C R Nuclear Enei-gy liability insurance Aasoc iatlnn
77/03/06 lp
-800711017-B Amend to Endorsement 33 to advance prim turn fc »ti! premium
endorsement to NEI.Irt Policy Nr-pao Const! Imtas EndorsemBnt
33
Di\lfOES,C R Nuclear Energy tlaliility Insurance Aasor iatlon
77/OB/17 lp
BOO724020a Forwards D6W licensees' responses to 790707 rfqunt for
r*vleu of schedule for installing safety-grade- anticipatory
reactor triji For lots, of feediuater t turbine trip Revieui
should be completed by 791115
CAPRA.n A TMI-2 Bulletins t, Orders 79/1O/24 lp
ftOQ7S30QVt (Inquests submlttal oP proposed Tech Spec changes providing
tor redundancy in decay heat removal capability in all modes
oF operation Model Tech Specs iuh(ch would provide acceptable
reiplution end For- guidance
EIBENHUT, D O Division of Licensing BO/06/11 63pp.
8007020017 Discusses licensee consideration of increased on (ltd
radupaste storage Requests reviews For onsite storage
additions in monthly operating repts Draft licensing
position re ensile storage safety considerations encl
rtEID.fi W Operating Reactor* Branch 4 GO/06/12 13pp
BOO7140413 Submits info detailing leak testing operation plans, pur
QOOSSf telcon Test to be performed B00703-15 ». 0733-0804,
ponding P.aDER approval
KLIMOAKAN.R M Metropolitan Edison Co BO/06/ 16 Bpp
QD071401S3 Forwards revised Tech Specs Table 4 1-2 from uhlch footnoto
uas inadvertently omitted par 800603 Amend 53 to Ulcsnao
DPH-SO Footnote is not related to Amend 55 but to 761H17
Amend 12
REID'S W Op era tin g Reactors Branch 4 90/06/20 3pp
— BOO71-HH25 devised Tech Spec Table 4 l-3j from which footnote uaa
inadvertent It) omitted
* Operating Roactcirs Branch 4 QO/06/BO lp
B0070I0460 Requests NRC concurrence in use uf Mine Safety Appliani
flMR-I *i Scott TEDA-Jl r-ospiratoTy protsction cannisters
against airborne radioactive matls Lists addl precautions
for- us? of cannister flclatoil correspondence oncl
K MBtropolltan Edison Co QO/06/H6 3pp
i Co
1055
BOQ717O309 Requests implementation at recommendations contained in
NUREO-0612 "Control of Heavy Loads at Nuclear Power Plants-
flesolutlon of Talk Action Plan A-36 " Guidelines for
control of heavy loads encl
EI8ENHUT. D 0 Division of Licensing BO/06/26 47pp
8007iB041fl Provides info omitted from roEpon&E to NUREG-0577. duf> to
lack of info Info re lateral support of •steam generator,
reactor coolant £. identification of mm operating temps
shouli) result in lower Eiiacoptib 1 1 1 ty c las ai f i cati on
HEIJBEIN,.! 0 Metropolitan Edison Co BO/07/O9 5pp
8007240141 Requests licensee action to begin Implementation of
recommendations to assure safe handling of heavy loads Alao
requeats review of control for handling heavy loads to
determine extent to which end guidelines are satisfied
EIBENKUT.D O Division of Licensing 80/Ot/Si 47pp
BOO701O3S6 Forwards simplified logic of degraded grid voltage, in
rtsponse to questions raised during 8 0060 S conference call
Revised Tech Specs Change Request 60 uiill be submitted by
80082?
HEHBEIN, J 0 Metropolitan Edison Co 80/06/27 3pp
S00707O2B1 Responds to NRC BO 0202 request for revised lubmlttal date
!•• inadvortont reactor scram/safety injection Revieu of
safety s^s surveillance procedures & mot policies t,
proc*dur»s scheduled for completion by Jan 1901
HERBE1N.J.Q Metropolitan Edison Co BO/06/30 Ip
B00707O294 Responds to NRC B003O7 1 tr re TMI-3 related requirements
Itini I A 1 3, 1 A 3 1, I C 3, II K 3 & III D 3 4 currently
undtr revieui for TMI-1 Items for TMI-2 uilll be reported
under separate cover
HERBEIN.J C Metropolitan Edison Co BO/Oi/30 2pp
B00707Q343 Informs that due to relationship of tests to Crystal River 3
• vent !t IE Bulletin 77-27 response, tests verifying effects
of combination of power lois on instrument* fc control
function! uiill be provided by 800930
HERBEIN.J G Metropolitan Edison Co 80/06/30 ip
BOO7080O74 Forwards resolutions to long-term generic issues re May 1979
Comnlidon orders li addl info requested concerning small
break LOCA,
HERBEIN.J 0 Metropolitan EdiBOn Co BO/06/30 lOOpp
B00717O631 Forward a questions re fuel assembly holddoum spring failures
first observed at Davis-Besse 1 & under investigation by
B&M Results of holddouin spring insps at facility as well as
tflfetg significance required uilthin 60 days
NOVAK, T. M Assistant Director for Operating Reactors BO/07/01,
6pp
B0072BO345 Advises of personnel chanses resulting from reorgani I etian
of Oft Nuclear Reactor RoQulBtion
NDVrtK. T M Assistant Director for I.iten-Eina E10/07/10 4pp
a0071SOia89 ForuiardlE rosponse to HOOSI9 Iti re discovery of cracks tn
ksyiuay !• bore suctions in Uest inghouse 1-ou presturB
HERDEIN.J G Metropolitan Edison Co
29pp
OOO721O375 Foruiards iescr i ptioii af cnntml room design & guidelines
for control room review Guidelines uill be- eijianded Agrees
to discuES progress at 800721 oppning st'Saion of NHC cnntrol
room design review
HERBEIN, J G Metropolitan Edison Co BQ/07/ M 29pp
0007220561 Advisee of error In reBpontos for Site Specific Question I.
Parts 13 6 C, submitted in B00616 1 tr. i n reft-pon* e to questions
re loitf turbine disc cracking Correct respotise-a enc 1
PARKER. U D Duke P nuier CD BO/07/17 2pp
00072000-33 ForuiarUs list of TM1 program nfc staff members to be used
for rof in future c orr espondence
COLLINS, R C TM1 Program Office BO/07/17 2pp
Q Inspection reports, IE Qu.lletinE !i corrcs.pond ence
B007100O09 Forwards combined IE Insp HeptE 50-320/79-2'! t. 30-289/79-31
on 791023-1127 !< notice of violation
CRIED, B H Region 1, Philadelphia. f)f*Uo of the Dlractnr
80/01/09 3pp
--B0071O001S Notice of violation from map On 791023-1127
» Rogi-on 1. Phi 1 ado Ip h io. OFfieo oF the Director 79/13/30 Ip
— BOQ7-100014 Combined IE Insp Rapto 50-32O/79-29 d 50-389/79-31 on
791023-1137 Muncomp 1 iance noted Failure to store & control
licensed watls in unrestricted areas
WHITCiJ R . VUHAS.Q iP . HCGAUQHY.H W Region 1, Philadelphia.
Office of the Director 79/12/20 16pp
BOO721O004 Forwards questioni re fuel assembly holddoun spring insps Ic
safety significance of operating ui/broken sprint* in core.
Request* rtipanse within 60 days
NOVAK, T M AssUtant Director for Operating Reactors GO/07/O1
0007020161 Forwards IE 1 n Fa Notice B9-33. "Breakdowns In Contamination
Control Programa " No uritten responsB Tequired
QF1IER.il H Region 1, Philadelphia. Office of thn Director
BO/OS/SB Ip
B00708033B Forwards B00616 Info Itr to PADER, r»<tuesting approval to
leah test tuio neu tanks at THI per ETS 5 t
HERBEIN.J 0 Metropolitan Edison Co 80/07/03 3pp
B0070103ID Foruarda IE Info Notice 00-23. "Loei of Suction tn Emerflency
Feeduater Pumps " MB written rpsp<ii>si> req_uirod
ORIER.B H Region 1, Phi laifelph in, HFfice Df the Director
80/09/29 Ip
B007140419 Foruiardi info Itr submitted to PaDER. requesting new tank
leak test approval per ET8 56213 M/o end
HERBEIN.J 0 Metropolitan Editon Co BO/07/02 2pp
B007250001 Requetta submitta) of application for amend to licensB
Gontlstlng of Tech Spec changes li license conditions PWR
Model Toch Spec* d Modol license conditions for TMI-3
Lfssons Learned Category A Items encl for guidance
EISENHUT, D 0 Division of Licensing 80/07/02 fc9pp
B00710O316 Responds to B00i2i Itr requesting correspondence from NRC
in response to BO 0321 Itr from Chairman Bhanaman to J
Ahearna. Forwards Ahearne 800507 Itr to Shanaman U/o encl
BMANfiaN.D T Hearino Branch 1 00/07/07 Ip
BOD71&0670 Notifies that drawings havo bean forwarded in response to
NflC request for info re containment bldg reinforcing steel
& prestressed tendons
SLEARi D S Oeneral Public Utilities - GPU Service Corp BO/O7/OS
IP
BOO714O34& Requests exemption from requirements of 10CFRBO,App Hr
concarning reactor vessel matl surveillance program Encl
justification provides basis for request
HERBEIN.J 0 Metropolitan Edison Co 60/07/09 3pn
B0071 40365 Comments on NUREO-0377 ra inclusion of facility as Class 1
BUsceptiblli tu Unit uitt tie roclasnified baaed on encl info
Qv»r*ltad draiuinfls available in Control File* only
HERDEIN. J 0 HfiroiJoliton Edison Co 00/07/09 24pp
8007330301 Forwards IE Insp Kept 3O-389/BO-12 nn QOO-123-23 No
noncompl 1 ante noted
MARTIN, U 0 Region 1, Ph i ladelph ifli SaFoguflrds Branch 00/03/30
Hpp
— B007H30300 IE Insp Rept 5O-SB9/SO-I.1 on aOC)fl23-PS No noncompl lance
noted Major areai inincctcd physical b»rrierai accosa
control . assessment a i ds-i [onununicat ions t- records
Details withhold (ref 1OCFH2 790)
LADUN.R H Region 1, Philadelphia, Office nf the Director
DEVLIN, J W Reoion 1, Phi ludelphi.i, Baf eg uarili Branch BO/03/22
B00701013D Responds to IE Bulletin 7'/ 37, "Lusi of Non-ClasB IE
Instrumentation fi Control Poiunr ^ys Bus During Operation "
Requests eitension until C00730 to submit remaining required
Info
HERBEIN.J 0 Metropolitan Edison Co BO/OA/OJ Ip
800781O372 For«uar<!s IE Info Malic* BO-26. "evaluation of Contractor
QA Programs " ND uiritton rctponan ruquirefl
CRIER. D H Region 1, Phi lode] phid. Offict u-f tliu Director
BO/Ofa/10 lp
3007160349 Toruarils [E InPo Notito RO-J?, "n*'g rrtd.itiun of Re-actor
Coolant Pump Studs Nn specific net ion ur resfioiiBo
required
OHIER.D M Region 1. Philadelphia. Offict of thi? Hirestor
80/06/11 lp
106
DOCKETED ITEMS
BOO733OJ3D Forum- it » IE In*p Kept 50-BS7/BQ-11 an 000438-0503 No
•nan camp 1 1 ance noted
8HUNNEB,£ J Region 1. Philadelphia, Reatt&r Operations Nude
Support Branch BO/06/12 Cpp
8QQ731Q31B Forwards response to deviation noted in IE Insp Rapt
50-2B9/9O-O5 Corrective action iaaued GAI/GPUNC TMI project
mgt manual & QPlffJC E8-OD9 to ensure that all OAI worli la
done per RRfl
HEFtEEIN, J B Metropol itan Edison Co BO/O7/16 2pp
— 0007230137 IE 3nsp flop t 5Q-3B9YBQ-.il an 800428-0502 No nnncorap ] (ance
noted Major ai ea<t inspected flA progran Implementation In
areas -of design changes, mod E. audits, QA/QC nurvei 1 lanse !,
reatart program
NAPUDfljQ Region 1. Ph I Bade 1 phi a. Office of the Director
CREENMAtf, E 0 Region li Ph I ! adulpli iai Realtor Operations Nuclear
Support Branch 30/06/11 5pp
BQO7O207I5 FormSt-ds IE Bulletin BO-15. "Possible Lnsn of Emergency
Notification 3Ljs (EMS) H/Loas of Offsite Pouer " Written
response requtrec
GHI£R,B H Region 1, Philadelphia' Office of the Director
BO/ Ob/ IB lp
Q00702052£> F-oruords IE Circular BO-15. "Loss of Reactor Coolant Pump
Coaling & Natural Circulation Cooldnuin " No written response
required
GfilER, 0 H Region 1. Philadelphia. Office of the Director
BO/fli/EO I p
BQ07S1O13O Confirms B0070I mgt meeting u/util in King oP Prussia. PA to
discuss planned neai — term licensee mgt revieuis/appra i sals
which will augment routine NHC insp program
DRIER. D H Region 1, Philadelphia. Office of the Director
30/06/20 lp
B007I607QB Forwards IE Circular BO-14, "Radioactive Contamination pf
Plant DenMneral 1 red Hater Eys ti Resultant Internal
Contamination of Personnel " No mitten response required
CRIEF1.B II RflQlon lj Philadelphia, Off IIP of the Director
BO/OS/ 2 4 I p
BO 0702053 5 Notifies that response to IE Bulletin 8O-13. "Decay Heat
Removal Sg a Operabl 1 1 tij , " mill be provided ou 0001,30
HERBEIN.J Q Metropolitan Edition Co 80/06/23 2pp
8007310202 Foruards IE Imfo Notice BQ-31, "J.ou Level RaduastB Burial
Criteria " No uritten response required
CftlER.B K Region 1. Philailelphia. Office of the Directnr
lp
BOD7070266 Desponds to IE Bulletin BO-OS, "Vacuum Condition Resulting
in Damage to Chemical Vol Control S"J5 (CVCS) Holdup Tanks. "
nevieu at bulletin is ?till underiuaij R-eaponae mill be
provided t»i B00725
HEflUElN.J O Metropolitan Edison Co SO/Of,/27 Spp
8007230129 Forwards IE Bulletin BO-16, "Potential Mtaapp] icatlon of
Rosemount Inc Models 11S1 ic 1152 Preasure TTanBdiittero
W/Either A or D Output Cades " Wrttten responso required
IE Circular BQ-16 also fl-ncl No uritten response required
GfilEI?, B H Region 1. Philadelphia, Office of the Director
BQVOo/27 2p.p
3007250504 Responds to deviation noted In IE Inap flept 50-2B9/BO-OS
Corrective actions Q/tl/OPUNC TMI project mgt flianua 1 , Revi 1 Ion
O dta BC-0430 !. QPUNC EB-O07. Heviaion O dtd BO07OB issued to
• najre all DM uiork la completed par util document
HERDEIN, J O Heti-opolltan Edison CD BO/07/16 Hpp
B0072a0593 Advises that review of IE Bulletin BO-10 rn contamination
of nonrad i oac tive sijs b resulting potential for unmonitored
uncontrolled environ releases has not been camplBteil
Response mill be submitted ug BDOB15
HEnBEIN. J 6 Metropolitan Ediaon Co 00/07/17 lp
8007320492 Responds to IE Bulletin 30-OB, "Eiam of Containment Uiner
Penetration Welds " Containment penetrations were shop
fabricated, ciaminetf !< pressure tested prior to ahipmsnt to
site For installation
HEHGEIN,J Q MetropDl i tan Edison Co BO/07/JB lp
8007250401 Forwards final master list of Class IE electrical equipment
required to function under postulated accident conditions in
response to IE Bulletin 79-OIB. , Item 1 Final response to
incomplete items mill ba provided bg B009O1
HERB£IN,J 3 Metropolitan Edison Co BO/07/1B 32pp
BQO?31Qt>l7 Responds to noncomplianee B noted in 791O25 notice of
violation Corrective action procedures extensively revleued
d rsvised. radiation protection pla-n revisod b review
organl rat i on under ttudg
HEHDEJM, J 0 Metropolitan Edison Co 00/07/21 13pp
n Periodic operating reports !. related correspondence
BG07Q201B2 Forwards THT Program Ofc ueeklg status rept for wk of
800614-20.
COLLIN9, J T TMI Program Office 00/06/33 fipp
B007IB0539 ForLjards TMI Proaram Ofc u«ekly status rept for uk andlnn
800705,
COLL1WS, J T THI Program Clffice 00/07/07 20pp
B007350719 Forwards status rppt for iuk of B00706-13
COLLINS. J T TMI Program Office BO/07/14 £>pp
B007310136 Forwards ueoUy *tatus rept for B00713-19 Liquid effluentm
from Unit Jj released to Biisquehantia Riveriwere uithtn Tech
Epec limits No liquid effluents discharged from Unit 2
COLLINS, J T TMI Program Office SO/O7/SI Spp
50072907^ Forwards monthly operating rept For June 19BO
HEftBEIN.J Q Metropolitan Edison Co BO/07/24 lp
BOD7J10446 Forwards response to IE Bulletin BO-Oi Elementary diagrams
for all engineered safety featuren ruvealed same sampling
valvea not remaining in «<nergency mode Resetting containment
isolation signal win close valves
HEHBEIN, J 0 Metropolitan Edi^-OTl Co BO/07/O2 4pp
— 6007890603 Monthly operating rnpt for June 1980
HITCHELLrD O Metropolitan Edison Co BO/07/13 6pp
S ReportJble nicurrences. LERs fc related correspondence
60070B0373 Responds to IE Bulletin BO -13 re decay heat removal ayg
operalnlity Dasl'j logs & uepklij ti monthly surveillances
monitor per f Drmanie capabilities of decay heat removal sys
Discr*panci*5 corrected b« torrertive maint proapara
HERBEIN, J G Hntropol t tan Cdisan Co BO/O7/03 3pp
8O07150/31 Respomfs to IE Bulletin QO-ia re deifly heat removal loss
ProvideE- procedural changes From review re adequacy of
safeguarding against redundancy loss & diversity of decag
heat Tenmval capabilitu d adequacy of less event response
HEHBE1H.J 0 Metropolitan Edison Co BG/07/03 4pp
fi0071403ai flequesti FoTflial resalutioji to settle disagreement betuieen
iftil fc Rrgton i ra use of ultrasonic calibr hlocti, as
discusaed kr> IE Inap Rppt 30~aB9/BO-Q9, Item 2 Util disagrees
w/interpretatlons of ASME Boiler fi Pressure Vessel Code
HERBEJN. J O Metropolitan Edison fa BO/D7/Q9 llpp
B0073B033i Foruards response to IE Bulletin 60-11. "Masonry Mall
Design " Malls lociited in reactoi auiiKarv fuel handlinfl b
turbine bldgs have been identified us being in proiimitij or
Saving attachment* from safety-rHlated equipment
HERBEIN. J 0 Metropnl itan Rdiion Co SO/07/11 34pp
BQ07B50B33 PNO-TMI-80-O33 on 800637. inadvertent emBrgencu safe-gual-da
sy-o signal mat actuated while in cold shutdown u/RCS
partially drained Opened valve caused 10.000 gallons of
uater bo be spilled in reactor bldg
HAVEIWAMP.D , FAS AND, A Re-gion 1. Philadelphia. Office of the
Director CQLLINB.J ^ TMI Program Office BO/Ot/H7 lp.
H007E30dl5 RQ BO-12/1P ourinin rcvleu of equipment required bij IE
Bulletin 79-O1D, found that post-accident pressure t< temp
uould be higher than postulated in NSC 730703 rept Short b
long-torm action to be discussed in follouiup rept
TODLE.B J Metpopolitati Edison Co BO/06/27 lp
8C07O7Q24B Forwards LER BO-O1O/01T-0
HERBEIM-J O Metropolitan Edison Co
2pp
— 8uO7D7v35& LER 80-01O/01T-O on SOOi.06, 1 icensee received Hr stating
F8AF1 does not assume that radioactive release paths eii*t
vie main aafety valves or emergency feed pump turbine
exhaust Caused by implementation of small break guideline*
MITCHELL, D 8 Metropolitan Edison Co BO/Oi/30 lp
B007070302 Forwards LER BO-OO8/79X-0
HERBEIN'J B Metropolitan Edison Co
80/0&/30 lp
DOCKETED ITEMS
107
— 00Q7Q7O313 UER 80-OO8/97X-O on BQ0430, dur ing annual msp of
diesel generator, bearing insulation determined duten 01 ati
Caused by normal aging or hedting bearing lube oil
Insulation replared b IOUILT viscosity oil used
MITCHELL.D 0 Motropolitan edison Co 60/06/30 3pp
A emergency
G0070B0211 For
HERBEIN, J Q
uards revised LEU BO-004/01T-1
Metropolitan Ed I son Co BO/Q7/03
--B007QBOai fl Revised LEfl BO-004/01T-! (in 90030(4. errors found In seismic
analysis of common decay heat siiction [lining associated u/
valves DH-VI t, DH-V2 Seismic analysis corrected t, mods
made to DH-V3 Mods to DH-VI tn Be completed by EI01O15
MITCHELL. D 0 Metropolitan Ellison Co BO/07/03 Spp
G007230I58 PNS-1-BO-01B on B00709, 1 ic enBC-e received telephone bomb
threat Licensee conducted full scale search ui/negat i ve
remits
BAILEY, R , MARTIN, W Region 1, Philadelphia, Office of the Director
00/07/09 lp
P Operating lie
stcjge dotumente t: ton
.ting u/Mcirl 1 uurif>r& group in B-ctticsda,
B007230030 Surnmai y uf 600207
issues relative tci Marfc I cuntniHment 1 ntiy-tc-rni proj
QRIMES.C T Plant Systems Branch QO/OJ/21 31pp
E3D07D1D070 Responds to FOIA ru
Tokar memo to ACRB concernin
Forwards documents Missing T
superseded or available elsa
FELTDN.J M Division of Rul
g pellet-cladding i
OtorOs ,ire dufilicat i
-B007O10134 Forwards DM Steinberg 750/^T memo re riant problems ditu t(
poor fuel performance l-'ac tore identified in memo arc
sufficient cdifse for fJ!»C to re-ei.imiix.' requ ir emi rita
applicable to fuel
O'REILLY. J P Region 3. Atlanta. Office of tfip Director
75/07/25 3f
B007160S34 Forwards LER BO-O12/01T-0
HERBEIN. J O Metropolitan Edison C
— B00716032A LER BO-Q13/Q1T-0 on 800627, during review of environ
qualification of equipment required to operate during main
steam linn break per IE Bulletin 79-GJD, Found that past-
accident analysis etceoded previous figures
MITCHELL, D 8 Metropolitan Edison CD BO/07/11 2pp
B00714061S Forwards LED BO-011/O3L-0
HERHEIN, J 0 Metropolitan Ed i sun Co
— B00716Q<b23 LER BO-011/03L-O on Q00610, reac tor bldg spray sys comjire
air test exceeded late date Caused by incorrect Sato being
entered into surveillance data tracking stjs Info corrected
Review of infrequent supvoi 1 lances uiill be performed
MITCHELL, D 0 Metropolitan Edlcan Co BO/07/ 11 Spp
6007330339 Part SI refit re cracked steam generator manutjig studs
Satisfactory operating experience Forms constitute
reasonable basis for continued operation while
invettlgatlons proceed
TAYLQfiW H Babcock tt WiUoi Co 80/07/11 5pp
B007240133 PNO-BO-003 on 000716, during NRC operations ctr drill, large
number of difficulties were eiperlanced u/telephone syo,
primarily dun to cutting of tolephanB cable
UEIBB, D H . THDMPSDM, D Office of Inspection !* Enf ortBment. Office
of the Director BO/07/1B lp
D0073801B3 RD BO-15/4P coofivminp B0072S telcon.on B00731, river uialor
discharge temp was more than 3 F below inlet river water
t*mp for appro* 6-h incident uill tie revieued to determine
corrective action Ilevieui to be included in follouiup rept
TOBLE.R J Metropolitan Edison Co 80/07/33 lp
— 8007010141 Discusses facility prubH-ms clue to jioor fuel performance
Includes in-fo re releases to envi ron, uipoaurf to situ
personnel > operational 1 Imitations, p, lens for future !. impat t
on Region I
STCFtNQEnG. D M Region 1. Philadelphia, OPficu of the Director
7S/07/S3 3pp
BO0721O087 Atfvises that ClflBS III fee is refluired for revieu of 3DC"103
Itr requesting Tech Spec changes to permit operation in
Cycle 5 w/core spray sparser iracfcs
MILLER. M 0 License Fee Manao.emrnt Drdni.h SO/O7/OS lp
OOO71SOBS7 Disrusses review of (utility Tccd Spue definition of tfli-m,
"opeTable," applying to single faiiurt niteiion fot' safety
sys Current definition of oper.-iblu uill be minlifipd to be
consistent ujymodsl Tech Spor version
G Boston Edison (D 80/07/03 2pp
B0071B0393 Formarila lecimdary coptmnment leak rate lust data Test was
perfDrmed OOD433 to verify that secondary coiitainmu-nt uaa
not violateil by uorfc pDrforned during refueling
MCQUIRE.P J Boston Edison Co SO/0//07 lp
— B0071B0402 Beenndory containment le.ik rate IDEE data Includes test
conditions, base reading !> standby Gas Treatment Sye A ti D
porf ormanc o
K Doston Eillsnn CD 60/01/3^ lp
B00727O37t Requests o.tHnnon until 8Q091!) for comment pennil for
NUREO-OS7/, "Potential for Lou Fiacturo Toughness d Larnellar
Tearing on PUR Stuam Qoncrdtor !f Deactnr Coolant Pump
Supports " m>flEQ-Q377 eiperienced distribution difficulties
ANDCHJN1N1.Q C Boston Ertison Co BO/07/P1 1 p,
0 Inspection roports, 1C Bui 1 et im, !i i on
U Congreislonal/Eiccutlve Correspondence
8007110363 EiprooBBH interest of Environ, Energy fc Natural ResourCBH
Bubcomml ttee in TM1 accident implitalinns Coraml saioner s are
invited to B00705 public hearings to prusent HRC policy
ititenent tc discung intervenors' limitations
MOFFETT, T Congress (Joint tt Rotating Committees, etc ) BO/06/H4
lp
0007140440 Forwards IE Bulletin £30-13. 'Trarking in Core Spray
Spargers " Url tteii response required
ORIER, D H Region 1, Phi Iddel phifl, Office of thu Cireclor
HO/05/12 la
80O71BOD77 Foviuards TE Insp Re|it SO-a^'l/ao -l I on HOOJ1O- 14 No
n onto nip 1 lance noted
BRUNNER.E J Region 1, Phi lad p Iph in. ReaLtor Oppi-ulions Nuclear
Support Brancli 80/08/an app
DOCKET 50-293 PILGRIM NUCLCAR POWER STATION, UNIT 1
F Security, medical, omergency fc flro protection plans
80Q701030B Forwards updatud table of incomplete fire protection Issuer
as of B00613 Preliminary fire protection review rept
idfntlfioE supplemental info/mods for itemo requiring addl
info
IPPOLITO,T A Operating Rcnctors Qrnncli 2 BO/06/19 2pp
8007030143 Forwards draft revision to radi Ql»B ical emergency plan Plan
uithhBld per privacy Act & available in Central Files onlv
ANPOONINI.G C Boston Edison Co BO/07/0) lp
0 Adjudicator!) correspondence
— B0071BQIQI IE Insp Rept 50-^93^00-11 on 000-310-14 No noncompl Inncc
nntod Mfljor areas- inspected OA annual ruvleui, OA/QC
administration program, denign clidiigos, mod program !> plant
moil s
NAPUDA, (9 , HODKBTS-K Region 1. Pli i ladolphin. OPfiCff of tfio
Director GflEENNAN, E Itoginn I. Philadelphia Reactor Opei-attcins
Nuclear Support DrancFi DO/ 05/20 Hpp
gOO70aOI16 Formards IE Info Notice BO-?0, "Br Biiddoune In Contamlnatlnn
ContrDl Programs " No writ tor, response required
DRirn.T) H Region 1. Phi Idiislfi h la. Office of ttit Director
BO/OS/SB lp
0007010377 Porikiairts IE Info Nutlet BO-?3, "Loss of Clint Ion to Erners-cncy
Feediuater Pumps " Mo lurittcn ro-spon-.o required
ORIER, DH Region I. Phi l.idelph i n, Office- of the Director
BO/05/E9 lp
8007310243 Forward n Commission BOO5S7 memorandum ti order containing
decisions on UCB 7BOS03 petition for reronsideration of
7B04J3 memorandum Si order UCB 771104 petition sought action
rt fire protection for electrical cable*
EISENHUT.D fl Dlviainn of Licensing HO/06/BB B9pp
6007100O6B Ack receipt of B00rif;o Hi informing NKC nP stepi tjken to
correct violations neted lit IF Iusp Hept SO-J'^^/tlO-OH I tr
withheld <rof 10CFRK 790>
MARTIN. H G Region I. Pill ladplphia, Bafca»S''1= Rr.tncH SO/Ofc/01
108
DOCKETED ITEMS
— BOQ71O007! Forwards IE Jnsp He-pi DO-a'ya/EO-Oa (ill BQ0227-29 tr notice
of violation Mot ic i' of violation withheld (ref 10CFR2 790)
MARTIN, U G Region 1. Pti 1 lad el ph 1.1. Saf e-guai ds Drancli BQ/O4/24
— 600-71100074 IE Insp Slept SO-^Zi/BQ-OB on 600,237-29 None amp 1 1 ance noted
failure of security organi la 1 1 tin to follow response
proceduros in security t ontino. ency plans Detaili withheld
Ircf 10CFR2 7901
LADUN.R H Region 1, Philadelphia. Office uf the Director
EEULlNi J W Region 1, Philadelphia. Sa+eguords Branch -00/04/17
IP
SCO7210531 Forwards IE Infa Uotice BO-B6. 'Evaluation of Contractor
QA Prosr""™* " Wn written response required
DRIER, 19 H Region J, Philadelphia, Office of th-o Director
BO/Q6/10 lp
S007MQ257 Forwards IE Bulletin GO-J4, "Degradation of BUR Scram
Discharge Vol Capability " Written response required
GRIEfl.B H Region 1, Philadelphia, Office of thfl Diroctor
BD/Qb/12 lp
6007250267 Forwards IE Insp Wept 50-293/30-2-1 on UOD409--1Q No
none amp] iance noted
CARLSDN.R T Region 1. PH 1 1 ado 1 phfa. Roartor Construction t,
Enflineering Support Branch BO/O£>/1fc Spp
— 8007330270 IE Inip Rept 50-393/60-21 or. 800409-10 No noneomp 1 i ante
noted Majoi areas inspected routine irtsp of installed main
steam automatic dBpTe39ur i rat Ion sy s relief valve d solenoid
va 1 ves
EBNETER.S D Region 1, Philadelphia. Reactor Construction A
Engineering Support Branch F1NKEL,A E Region 1. Philadelphia.
OfFicc of tho Director HO/06/13 3pp
B0072B01JQ1 Forwards IE Invcs ti gati ort Hep t bO-S93/HO-19 on B0012B-OS02
No noncomp 1 i anc e noted
GfUER, B H Hey ion 1. Philadelphia. Office of tht Director
flO/06/17 2pp
— 8007380408 IE Investigation Rept bQ-313/BQ- 1 1 nn G0012B-0503 No
nonLOmp 1 i ance nnted Major arrea inspected allegaliona
contained »n BOO33O, O403 1. 1)B neuispapor articles rn spc»r*ty
guard miSLonduct
ALLAN. 0 M , BMITH-R H Region 1. Philadelphia. Offtce of thfr
DiractoT BO/0&/13 I7pp
BOD7O2069! Forwards IE Dullctin «0-19, "Possible Loss of EmerBBnci/
Notification BIJB (ENS> W/Loii of OFfbite Power " Hntteii
r»BpnnsB TBijuirotf
GDIER.D 11 Region 1. Pdl ladplph in. Otfi.ce of tho Director
BO/Oi/lR If
3007020486 Foriuaids IE Circular 00-13. "loss of Reactor Coolant Pomp
Cooling ^ Natural fire ulat I on Coo Idnuin " Hn Liritteri r-eaponsif
required
ORIEfl.D H Region 1, Pliiladtlphia. nffice of the Dtt-uctor
tp
B0071606B3 Forwards IE Circular £10-11, "liodi oac 1 1 VE Contomlnation of
Plant Dejninera 1 i red tJa tec Sj?, !i fit-sultant Intarnril
Contaminat ion of Personnel " Nn urltlen i-espnn,iB renuired
ORIEn.D »t Region 1> Philadelphia, O-ffice of the Director
BO/06/B1 lp
B007S10161 Forwards IE Info Notice dCl-2<1j "Loin Level Raduatte Durial
Criteria " No written rpspimse requirei!
ORIEH.D H Region J. Philadelphia. Office of the Director
80/06/25 lp
B007140'115 Hofipundfi to IE Dullfftin 79-14 re ae-built BaPetij-relfltDiJ
piping ^y£ neismic atia)yEii5 Snf p Lij-rel.i ted piping 5ij5
physical insp -inmpleti><) t> imp floviat ioni resolved -fiGismlc
analyses input documents rnvlpuied !i mn*t mods completed
C Bost-on Edi son Co
B007210rlOi!i Suhrnllt fiummarg of Insp 't analijs-15 results u/status of roods
p«r uti! overall comrai tment, in i«<ipnnse to IF Dulletln
79-14 Fitiiil rept re pi-ocedurp5 !. iriteria iui 1 1 tie submitted
bM 90173-1 Support modi expected tn IIG LomiilEteil l>y 60090]
C BostDn Tdlson La B'J/t)*/37 Spp
B007210301 HesponrfB to IE Bulletin BO-OA Tt eng Ineeretl safety feature
TBBet tontroli Components aitigneJ In tuu catEgorle* i tarns
Tequiririg. singlp opeifttor art-ion fc Item* requiring tuo
operator action-! to retet initiating oner ffencij s-ignal
AWDOQNlfll.O C Boston Edi-nn Co
BOO7230091 Forwards IE Dulletin 60-16, "Potential Misapplication of
Rosemoiint Inr Models 1151 fc 1152 Pressure Transmitters
W/Eittior A or D Output Codes " Written response required
IE Circular BO-11 also encl No written response required
SKIER, B H Regiun 1, Philadelphia, Office of the Director
BO/Ofa/27 Sop
BOO72301B2 fttk receipt of BOObOl 1 tr informino NRC of steps taken to
correct violation noted in IE Inap Rapt 50-273/BO-14
BRUNNER.E J Region 1, Philadelphia, Reactor Operations Nuclear
Support Branch B-Q/Oi/27 lp
— BOO7a3019i Responds to NRC BOOD-13 I tr re violation noted in IE Insp
flept 30-293/BO-14 Corrective actions records of all licensed
operators being reviewed to bring Forms 0-3 up to date
ANDOONINI.G C Boston Edison Co 90/06/04 Spp
— 3007330202 Forwards IE Insp Kept SO--293/HO-14 on S004QB-11 <r notice of
vi alation
URUNNEH. E J Region 1. Philadelphia, Reactor Operations Nuclear
Support Branch 3O/Q3/I5 Sfp
— 0007230209 Notice of violation Prom insp on B00408-11
a Hegion I, Philadelphia, OfPlce of the Director BO/QS/O9 lp
— B007230231 IE Insp Hoot 5Q-293/BO-I4 on B0040B-11 Noncomp 1 iance noted
failure to keep reqiifl 1 1 1 i c at i on program records as required
h"j licensee manual
BETTENHAUSEN. L . KEHOE, D V Region 1, Philadelphia, Offics of ths
Director CAPHTON, D L Reoion 1, Philadelphia. Reactor Operations
Nuclaar Support Branch 30/OS/O9 flpp
aDQ722OI74 Forwards notice of vi c-lat i on. notice of proposed imposition
of civil penalties tt 1 tr of reprimand re SO 030 B incident
of Irradiated fuel being moved ui/o secondary containment
integrity
BTELLDjV Office op InspP-ctlon t- Enforcement, Office of the
Dir-Bctor 80/07/03 3pp
— 8007320179 Notice of violation Prom inep on B00303-21
» Office of Inspection ti En fore ement, Office of the Director
HO/07/OS 2pp
— 8QQ722Q1B1 Notice oF proposed imposition of civil penalties In amount
of *13iOOO re 800303 moving of Irradiated fuel u/o
secnndaru containment integrity
ft Office of Inspection & EnPorc ement. Office of the Director
SO/07/OH lp
— HOQ72201B7 Expresses concern TB conduct during B003Q8 incident at
facility Future violations may result in stringent NRC
enforcement actions Including license mod, revocation or
suspension &/or civil penalty
BTet-LQ.V OPFice of Inspection Si Enforcement, Office of the
Director BO/Q7/OB lp
— 8007320191 Foruai-ds notice of violation re actions during 80030B moving
of irradiated fuel u/o secondary containment integrity at
facility
BTELLO.V DPFice of Inspoetion t, Enforcement, Office of tlie
Director BO/07/OB 2pp
— B007220197 Notice of violation for License SOP-15B3-4, bated on insp on
1100303-21 re J Alutonis activities flurina B0030H moving of
irradiated fuel ui/o tocondnMj containment Integrity
« Office of Inspoetlon «< Enforcement, Office of the Director
BO-/07/OB lo
SCI072-4O373 Confirms oral notification made on B00707 that 80-day
period for completing tests required by IE Bulletin 80-17,
Item 2. began at 12 Ol AH on BOO7O9 Also requests Immediate
notification uP anil malfunction found during testa
ORIER.BII Region 1, Philadelphia. Office of the Director
00/07/09 2pp
B007B1O373 Responds to Item I & provides comments re Item 3 of IE
Bulletin BO-17. "Failure of 76 of 183 Control Rods to Fully
In-sert During Scram at BHFl " Enaffiinations shouiixl '
insignificant amount oP water in 4-inch discharge header
HOWAHD.J C Boston Edison Co BO/07/10 3pp
B007250309 Bubmlta reply to IE Bulletin BO-10 re contamination of
noivradioactivu sij s !- potential for release to environ
Ssmpl Ing, analysis ti monitoring programs determined to be
adequate
C Boston Edison Co BO/07/11 lp
BOO7EQ0210 Ac* receipt of BOOA19 I tr informing NRC of steps taken to
correct violation, noted in IE Insp Rept 50-293/BO-1B
DRUNNER,E J Fijian U Phi lade I p-nia, Reactor Operations Nuclear
Bupjiort Branch BO/O7/11 IP
DOCKETED ITEMS
— B0072SQ232 Responds to NRC BOO327 1 tv re violation noted in IE Insp
R»pt 30-393/BO- IB Corrective actions covers installed on
feeduater check valves uihen work not being performed
ANDQONINI.G C Boston Edison Co BO/06/19 2pp
—9007280356 Forwards IE Inap Rept 50-39J/BO-1B on BOG132-30 fc notice
of violation
BRUNNGfi.E J Region 1, Phi ladnlph is, Rene tor Operations Nuclear
Support Branch BO/O5/27 2pp
B0070aOlI3t Forwards LEO BO-O^fi/O^L-O
MCOU1RE.P J Boston EJisoii Ci. 8O'O7/OE
LER HO-02(./03L-0 on nOOfiOI., i eat tor Bcram initiated ou,
NfiC not notified uiithin rcqiiirnd time Caused li ij operations
peraonngl error Requ h r amenta lo-emphati^c-d
MCLGUGHLIN, M T Boston Edison Co BO/0//03 If
— S 0072602 SB Notice of violation from infip nn 800432-30
» Region li Philadelphia' Reactor Operations Nuclear Support
Branch 80/09/33 lp
—8007280262 IE Insp Hept 30-293/BO-1B on 800422-30 Noncompl ianre noted
Failure to control foreign mail in accordance u/malnt
procedure requirements
JOHNSON. J , ROBERTS. K Region 1, Philadelphia, Office at the
Director MARTIN, T T Region 1. Philadelphia, Reactor Operations
Nuclear Support Branch BO/05/22 Bpp
BD070BO2O2 Foi
MCQU1F1E, P J
rds LEH BO-0.37/O3L-D
3oEtun Edison To [JO/Q'/a3
— B007OBOS05 l_ER BO-027/O3L-0 or, bUOfaO'J. *t«ic > gas grab sample pump I'll
tripped CauspcJ bg binding nr pump UUP In ocriimulilt ion of
dirt Pump refurbished * returned to s.vc
HCLOUGHLIN, M T Button Edison to BO/07/02 tp
0007160641 Forwards upriatnd LER 77-OQWO.1L-1
MCGU1HE.P J Boston Edison Co BO/O7/03 lp
B007210aSO Ack receipt of B00310 1 tr informing NRC of steps taken to
correct violation noted in B00215 notice of violation
BTELLO. V Office of Inapeitlon d Enforcement. Office of the
Director 80/07/11 2pp
I! Periodic operating reports ti related correspondence
— B00714.064B Updated LER 77-009/03L-1 on 7/0323, dunnn Etandhu opoi-atio
HPCf uas inoperablr For 5-h Caused by burnt out undervol tage
coil in bioaker for motor operated valve MO H3O1-3. ateflm
supply waive- to HPC 1 Caused tig nverheatins
MCLQUOHLIN. M T Boston Edison Cu aO/07/03 2pp
B007130i99 Forwards monthlg operating rept for June 19BO
MCGUIREiP J Boston Ediaon Co QO/07/OB lp
DOCKET SO-291 MKIHIOAN STATE UNW REbEARCH (ICAC ri>(l
Q InspHCtinn reports, IE Dulletini !- torrespondenct
--BQ07130704 Monthly oporatinp root for June 1980
WHITNEY. C 0 Boston Edison Co 80/07/07 4pp
8 fleportable occurrences. LERs ti related correspondence
H00717O633 FoTuardg IE Circular BD- M: "liad lonct 1 ve Contamination of
Plant Demlnerali I ed Water lijn >< Resultant Internal
Contaminatiun of Persnnnel " No written reiponiso required
KEPPLEFt.J Q Region 3, Cbicago, OfFitc- of the Director HO/0&/21
IP
B00124022B PNO-1-BO-3B on 800308, two irradiated fuel assemblies lifted
& rotated tn spent fuel pool tu/o meeting Tech Bpocs for
leconddry containment ti illesel generator opcrablllty Fuel
movement halted until Tech Specs met
LAZARUS. W -J i DRUNhJER.E flegion 1. Philadelphia, Office of Hi o
Director 80/03/10 ip
B0070 10540 Forwards LER QO-023/03L-O
MCOUIRE.J P Boston Edison Co 80/06/25
DOCKET 50-295 2 ION NUCLEAR PtJHEN STATIGN, UNIT ]
F Security, medital. umorgencg *< Fire ji rotec tion
F30070JO317 Forwards safeguards contingency plan amend flan
fref 10CFR2 79O)
PEOPLE&.D 1 CDmmonuua] kt, Edlaon Co (30/06/37 Sp
—0007010549 LER BO-023/03L-0 on B00927, during performance of
surveillance test re RCIC steam lino higli temp, temp switch
13&O-17A uias found out of calll>r Caused by sctpoint drift
MCLBUOHLIN.M T Boston Ediion Co 60/06/23 IP
B007070378 ForuiardE LEfi 80-021/01T-0
MCOUIRE.P J Boston Edison Co BO/06/35
0 Adjudicatoi ig correspond enre
S00731O243 ForwarilE Toitimi BSI nn B001SV inemurondura !< order containing
decisions on UCS 7R0503 petition For r ptcnBldBratiim of
7B041'] memorandum !< order UC& 7711O1 petition ««ught action
re fire protoctioii For clectrnol Criklpb
CISENHUT.O I! Division of Licensing aO/Oft/BTi B9pp
—8007070382 LER BO-Oai/01T-0 on OQOSOB, a Igae sample from discharge
outfall area contained roportable concentration of Co-fiO.
according to Yankee Environ Lab GOOM6 anal««io rept Cause
not stated
MCLOUOHL1N, M T DoEton Edison Co BO/OA/23 2pp
S007020t')ci Hemornn
opsclfyirg ISI>UP<, to be Jiscussod at 1300701
oral argumen t , r» State of 1L contonti on thnt applicant
commi tments should be integrated in liit'litc.' Tucli Sjiettntii
storage ptiol moil proc t'od ing
TOHPKINS.D A Atomic Eiafety and Uiefnauio Appeal Panel SO/Oh/Pl.
Spp
B0070302B7 ForuardB LEfl BO-OSI/OaL-O
MCOUIRE.P J Boston Edison Co BO/07/01
— 0007030389 LER BO-024/03L-0 on BQ0930, reac tor core Isolation cooling
tyt uas declared inoperable Caused liy faulty auto flow
control Unit repaired & returned to svc
MCLOUOHLINiM T Boston Edison Co BO/O7/OI lp
0007070357 Foruards LER BQ-Q23/03L-0
HCeUlREiP J Boston Edison Co BO/07/O1
—0007070300 LER 80-023/03L-0 On B00836, duri ng surveillance testing.
Channel B of rod block monitor sys determined to be out of
calibr- Caused by mislnterpertatian oF Tech Specs
Requal if ication progran will include ays review
MCLdUCHLINrH T Huston Edison Co BO/06/26 2pp
B00700D1BZ Forwards LER 00-OS3/O3L-D
MCQU1HE, P J Boston Edison Co BO/07/03 lp
— 8007080193 LER BQ-025/03L-Q on BOOfcOS, fire detection alarm Prom HPC1
a,u«dr»nt sounded in control room on pdnel C-94 Roving fire
patrol initiated & immediate investigation conducted Caused
by l»k at flanoe on HPCI drain line valve AD2301-H9
WHITNEY.O 0 Boston Edmon Co 80/07/01 lp
B007IOOO22 Foruarils "Tech <3pi?c5 for Nutlear Power Herictora." IOCFRSO
advance notice uf rul umafc ing. f or uh J i li lounaelB' attention
is invited by ASLB Comment B may be i-iibinitted to Ctijnmi st>lon
re BOO7O1 oral argument
BISHOP. € J Atumir Sdfcly and Liiensinj ftppoal P.inol 00/07/03
IP
— H0071OO026 "TDtti Bpec-i fni' Nuclpar J^oupr Reactors. ' ICirFRSO atlvancD
notice of ru3pmflking Estiiblishe^ ^.tif for deciding uhicli
items from SAF1 must bo nit orpoi atell into Tech 5 pec 6 !•
modifies deP tuitions of spec categorio-,
CH1LK.S O DfFice of the Secretary nf the Cammi'.Binn BO/OA/30
<7pp
8007300,163 Updates certain piojtrtL,rl load !i ca|iacity ostimates willed
apjiear in record of protending ppr applicant obliQatiun to
Veep AELAO appraised of development-, Related c 01 respondent o
STEPTOE, P P I a ham, Lincoln ?< Qeale HO/07/OB Spfl
H Qenoral corrospiindenc i
8D0711O533 Resjionds to GOQBi'B i eu,up5t bo reject ul 1 1 li i ense tn
Increase storage capacity ol- facility tpent fuel pool
rtctionc in * t latin) 791O1O to as^urf that emci jjent y piuna are
imp 1 ementHd at all licensed operat-ing reactor eitefi
DENTDNrlt R Office [if Nuclear Reactor Regulation. Director
ao/03/On 2p|)
110
DOCKETED ITEMS
BOQ731O2Oa Respond* to enc 1 BOO11B 1 tr to President Farter re Indian
Point facility Describe;! HHC cffcirts tn protect public
liealth at Facilities LurTerifcJij operating nr planned foi
operation Village Voice nBui article end
DENTON-H H Office (if Nuclear Reactor Regulation- Director
60/05/21 lOpp
QOQ7311XJ3B- Responds to en* 1 B(304DI telegram to President Carter urging
closing of facility !< si 1 nuclear plants near populated
aricas HRC BQ0229 i_cnf i rmatnry order required iraniBdiate
sJiart-term actions to assure public safety
EISENHUT.D G Qivisinn of Licensing BD.-O7/17 3pp
0 Advisory Commlttt
: tar Safeguards reports !t correspondence
S00722030B Provides summary of BQQ'i(l7-(ya meeting iii/utsls re core melt
accident sequences Utils appear Ln eipect NRC to resolve
problems «( da nothing to mitigate consequences of Class ?
ac c ident 5
CATTL3M, I Califoinia. Un ] v of, Los Angeles BO/OS/JO fcpfl
Operating lucnse stage documents ti tori-esponilent
00071BQ47i6 Submits addl info re 10CFF150.App J.BiEmption Mad to install
floumetHjr u/high f 1 au alarm on pone tratlon pressuri tation
piping to personnel air lock door seals completed Includes
marked sot of drawings W/o drawings
F CommonuealtJi Edison Co BO/07/07 4pp
B00717039B Summary of BOGoHS meeting ui/Pi c hard, Louie & Qarrick.lnc re
risk sturfij Including mo-deling for plum? tragectoru.
containment Event tree !. node! i ng. use of plant data t
consideration of external events
ISHAEL.E L Reliatilljty A Risk Assessment Branch BO/07/O7 Bpp
11007230646 Summary of 8GO307-O0 technology e»changB meetings u/utils
in Chicago. IL re core mfflt accident sequences & associated
phenomenology for facilities NflC perceives real urgency to
for answer* to key technical questions
MEVO, J f Reactor Systcmt Branch BO/07/09 12pp
&007280i03 Notifies that PO Btoddart, primary NRC rnvieuer for Zion.has
requested addl info to complete rovlBu). as reault of
discussions re NUf?EG-057G Jtem 3 1 Sa on improved post-
Occident sampling capability Li its drawings sent
NAUO>ITON,W F Connnonwea 1th Edison Co BO/07/31 2pp
GQ0424O40O Forwards odd! info re review of unresolved safety issuasi
trip rpp t of LptsunE Learned implementation teami (. task
action plan in vieui of high populstiun density surround in 9
plants
DEHTON.H J» DiPfirE of Nuclear Reactor regulation. Director
BO/04/Q9 33pp
BOO 723 &0 9 9 Requests aubmi tfca 1 op proposed Tech Spec changes providing
for redundancy in decag heat removal capability in al\ modes
of operation Model Tech Specs which would provide acceptable
resolution end far guidance
E1SENHUT.DO Division of Licensing GO/06/ 1 1 tHpp
O Inspection reports. IE Bulletins ft c nrrespnndBnce
BO07O2O063 Forwards IE Info Notice 80-33. "urnsHDiuna In Contamination
Control Programs " No uirltten response required
KEPPLER, J 0 Repjpn 3, Chicago- Offite of tho Director BO/O3/SB
IP
Forwards IE Circular OG-13, "Grid Strap Damage in
Hastinghouse Fiiol Assemblies " .No turitton responte rei[uirBd
KEPPLEH.J 0 Region 3. Chicaflo. Office of the Director BO/05/2B
8007100393 Summary of BQG520 Technology Exchange Meeting 3 u/utlU in
Betheida,HD to ili^tuaa accident mitlgatjon features for
power giants-
LONG.JK Division of Si|6terrm- Integration BO/Dii/ia 73pp
B007O100'B6 roi-iuards ie Info Notice BO-S3, "Loss of Suction to Emergency
Feadiuat&r Pumps " No written response required
KEPPLER, J 0 Resion 3, Chuago, Office of the Director. BO/03/39
6007010110 Notification of BOOfcUS meeting u/utiU (< Bandla LahB In
BetliBEda,MD fur preaontation c-F ovorvleu OF facilltlua risk
atudij Agenda- enc 1
IBRftEL.S L Reliability !, Risk A^aesaraent Dranch flO/06/16 3pp
B007I10557 Summary of B00530
action plan
QLEHAN, U IN Operating /teactors Branch I
cting u/util in Do theada, MD re atotus of
BO/Ot/2,1 3pp
0007010423 Foruiards Drawinj £2E-l-flB5Q- re ranctor. burb ine t. generator
trip protection, in response to BOQ619 discussion concerning
automatic initiation of auiiliarij feedMaier ays Drawing
available in Central Files only
NAUGHTON. W F Commomuea 1 tli Editon Co BO/Ofa/E4 Ip
aOO7O10ail Forwards response to 80022V conf i rmatorij order requiring
review of key plant ays volnerjihi 11 ty areas. POBB i b le
operator dependent areas k control room eraergencij
proceduroE
MAUGHTOW.W F Corajtionuea 1 th E Hi son Co BO/06/56 49pp
800701Oi!iOH Notification of 300617 meeting w/-utils in BEthosda, MD tn
discuss containment stru-cturs] r efipnnsei fai lure presiurDi ti
Failure motfes For facilities 3* ieacrlbed in HRC Q-00410 I tr
to CoflVFn- Ec5
MEVER.J F Roactnr 5i|5t«m« uraiich BO/OA/S6 3pp
B007070I16 Submits r*vlaed iesnon*os to NffiC 770603 lira re second
level oF underv oltagif protection For A kV nme-rgentij poucr
buses supplying BnFe ty-relatod luads
JANBCEK.H r Corrmonuealth Edison Co 90/06/SA Opp,
BOO7170319 Bummat-ij of 800612 meeting u/ulils in GBthesda.MB re interim
rettabilliu evaluation program
DLBHANi-L N Operating Reactors Branch 1 8Q/O&/H& 3pp
BOO7170241 Foriuarils reo.uPEt fop add) mft, re fiackPUting of severe
accident mitigation Features Response requested uittun 30
days
NOVAK, 7 H Afiistant Qircc toi Pnr nporating Reactora HO/07/O3
7pp
80O7330001 REquests subnittJ.) nf dppliration for amend to licenaij
•co-nsisting of Tort, Bpoe changDE Si license conditions PHR
Hndel Tech SP*LH (• Mods] Jnense conditions ten TMJ-3
Leasotis Laarncil Cntegorij rt items EIH 1 for gut riant a
EISENHUr.DQ DIVIBIOTI of Liteuslnj SO/07/OJ A*?pp
B0070H0030 Foruiards responae to IE Bulletin BO-OS, "Vacuum Condition
ftesultinp in Damage to Chemical Vol Control Bys (CVCS)
Holdup Tanks " Throe Zlon holdup tanks can be valved to
contain primary BIJS uater Positive pressure is maintained
PEOPLES. D L Commonwealth Edison Co BO/06/04 3pp
00072E01S(i Foruards IE Info Notice BO-3i. "Evaluation of Contractor
flA Programs " No luritten response required
KEPPLEff. J 0 Region 3, ChiiJigoj Office of the Director BO/06/10
IP
B007020199 rorwnrds IE Insp Repts 30-295/BO-09 b 50-304/80-09 on
B00312-15 ?< 19-20 & notice of violation Notice of violation
withheld (ref 10CFR3 790)
HINO.J A Reginn 3. Chicago, SoFeguards Branch BO/Oi/11 2pp
— BO»702Oail JET Insp Repts 50-293/QO-D9 t< SO-204/BO-09 on BOOS 12- IS fc
19-EO Noneompl ianee noted failure to conduct proper
personnel scrneninn to secure (< attend doors of vital
ai-oafi E< to taut alarm Eys Details withheld (ret 10CFR3 790)
HADEDAiT J < CHUIETEJFFER. 0 Region 3, Chicago. Office of the
Director HIND, J A Region 3, Chicago- Safeguards Dranch
BO/06/ 1O 3pp
B00716.0I6& Foruards IE Info Notice BO-27, "Degradation of Reactor
Coolant Pump 9tu<Is " No specific action or response
raqulreit
S Region 3. Chicaflo, Office of the Director BO/Ot/U
B007O2007i> Forwards rosponse to IE Bulletin BO-IS, "Dncaij Heat Removal
By s Qperab 1 1 i tij " Rcvieu of RHR degradation Hvents found
nun a similar to Davis-Hesse incident
DELOEDROEj L 0 Caminoniiieal th Edison Co BO/04/16 3pp
B007100004 Forward & respoHEe to IE Bulletin BO-09, "Hudramotor Actuator
Duf icie-nc i»»i " No safety-related su.s or componsnt at
Dresden a d 3 UBB& AH-9O or NH-9O series hijdramotor
actuatoTB
PEOPLES, 0 U Comnionuealth Edieoti Co 80/06/16 3pp
B007O30037 Forwards IE Bulletin QO-15. "Possible Loss of Emarooncu
NotiFfcvition Bys (ENE) W/LoSH of Qffaitff Power " Written
resoonae required
REPPLER.J 0 Region 3, Chicago, DffUe of tha Director BO/Ofi/lB
Ip
111
BOO70203B9 Forwards IE Circular 80-15. "Lusn of Reactor Coolant Pump
Coollnj & Natural Circulation Cool damn " No iiit-ittpn response
r squired
KEPPLER.J 6 Region 3, Chicago, Office of the Director BO/O&/2G
9007,250650 Forwards- espouse to tE Dulletin 00-11. "Masonry Wall
Design " Re[[ii(j5 te-d i Two-it i gat i nn r-ot performed at Dresden.
Unit 1 due to eitemlpd outage Rei|U i r em ent-, LJI 1 1 tie m&t prior
to itortup H^o flncl
PEOPLES. 0 L Commonwealth Edison LC SO/O7/07 2pp
BOO72307S4 Forwards IE Insp Reptfi 3O-295/BO-Of) t, 3O-304/80-OU on
a004E1.0S13-30-30 fc 31. No none omp 1 ianc c- noted
FIDRELLI-O Region 3. Chicago. Reactor Construction f, Engineer ing
Support Branch 50/06/53 2pp
fJO0739063G ForiuaTdt r^iponie to IF! Diilleiin BO-OB. "Ei nmination of
Cntitainmen t Liner Penetrat i OTI Spirts " DrE'.den Unit 1 designs
ui 1 1 be revieufld fi f nas ibi 1 1 tij of perfornung rad tctsraph I c
e laminations uu 1 1 tie .Tsipstitd be fore unit retui ned to svc
PEQPLCG, t) L fnmrronwuflltli Lil-joti Co HO/O7/O9 7pd
— -B00723075B IE Imp Repts 50-2?5/80-OB t. 50-304/80-09 on 300431 . 051S-3Q.
30 & 31 Ho noncompl lance noteil Major areas inspected Eergen-
Paterson largo bore hydraulic snubliers on Unit 3 steam
generators
DANIELSON.D H Region 3. Chicago, Reactor Consti uction &
Enjineering Support Branch YIN, I T Region 3, Chicaijo. Office of
the Dirtctor OO/06/18 3pp
B007170430 Foruards IE circular 00-11. "Radioact 1 vo Contamination of
Plant Demlneral lied Mater Byo tt Desultant Internal
Contamination of Personnel " No written response required
HEPPLER. J 0 Raglan 3, Chicago, affice of the Director BO/Q&fSq
Ip-
eOO7H302tB Foriaarit IE li>Bp Hepts 5Q-275/GO-11 J« 50-304/BO-l 1 an
8DD527-S9 i< notice of violation
DAVIS, A B, Region 3, Chicago, Fuel Facility & Materials Safety
Branch QO/0&/24 Sff
It Periodic operating i-a-p arts- tc relJt*J ror
BOO71flO327 Forward's montlilij uperating tepts For June 19flO
CltAEBBER.H L Comtftonueatth EiSison Co BO/O7/07 1 1>
— 60.07 1 4 033 ] Monthly opBTjtiug repts fur June 1S
caan, J M Compnimucal td Edisnn Co BO/O7/O7
FlBpor-talile occurrences. LEtts *• reJfltad c orfBS[iand«T>c i
HOO717O230 Part ?1 rept re defective H&stJniiliouse Tijpe W-3 suitch
Cauaetf by intermittent contact closure u/euiitch in
automatic start poaition Ut 1 1 s ivotified of potential
problem H5D technical bjllctin oncl
M WestinnhouEo Electric Corp BO/Oft/10 3pp
-BO 07230272 Notice of violation From insp on BOO 527 -2 9
» Region 3. Chicago, Office of tho Director 134/06/30
SO0701O4(34 Forwards Len SO-02P/O3L-O
WANDKE.N E •Commnnnjoal th Edison To fiO/Q£,/23 Ip
— HO07230276 IE In*p Repts SO-399/BO-1 1 (. 90-301/BO-l 1 On 900537-29
Noncompllance noted ncasa pH of uiaetH uater roleaSEd I.
failure to standardiie sodium hgdroilde solution during
baric acid titration
EBS18,T H . OEBTHANN.M J , ROYTEH, C Region 3. Chicago. Office o
th» Director SO/Ofi/HO 9jip
BDO7S302B9 Foruiardi IE Bulletin 00-16. "Potential Ml oappl icfltton of
finsomount Inc Models 1131 t, 1152 Prssoure TranEmittnr s
H/Elther A or D Output Codes " Written response required
1C Circular BO- lib also end No written response required
KEPPLER-J D Region 3, Chicago, Office of the Director BO/06/27
IP
B007310B07 Foru«rd» IE Una 1th Physics Appraisal Repts SO-a^S/HO-OS tt
3O-304/BO-04 on B0031O-21 , notice of violation t, cigniFlcont
appralial finding*
KEPPLER,J 6 Region 3> Chicago, Office oF the Director BQ/Ot/H?
— Q007OI01QB LER BO-Q2B/03L-Q on BOOB24, uh i U" iinr forming diusel generator
loading test ni ID dlesel gener-tttor. engine tripped after
running 5 minutes at fuj 1 lo.id Cauied bu air leak on supply
line fitting to fuel sfiutoff pistons Fitting replaced
T CammonuieBl th edi^on Co SO/O6/HT Ip
P007010fl9D Forwards LEFt BO-Oaf/CJL-()
UANDILE.N E Camntinuealth Edi^un (a
— B007OI0500 LEtt HO-029/O3L-O 011 BOO'iSl. while rBrnoving Insulation to
repair leak on discharge linv to burir acid filter l.heat
trace on circuits ONE 190/SOii urre damaged Coil soil b"J
numerouB nicks in hoat trace tiij pers-annel effecting repair
UAZELR1GG.S ComraonuDal tN F.diBtin Co aO/06/2A Ip
B0071i0655 Forward n LER BO-O30/O3L-0
. K L Commoniuoal th Edison <-o
B007310S10 NotlCH of violation from health phifsita appraisal on
800310-21
» H«gion 3, Chicago. Office of the Director HO/C-t/37 2pp
— S0071&0tifc2 LFR BO-Q30/03L-0 on go-Ofal^j during normal operation, condonsor
air e>ector offgas rnd inoni tor. 1RT-PT2&. Fat ]«d lou CjU6»d
tiit UIOTH C'Qntsct-i itibide phntoh-el ir. apparently worn douiTi
th-rough n-ormul ute Photohelic rppla-ced
03T.F CommDnuealth Edison Co 80/07/07 Ip
— 8007310515 IE Hnalth Physics Appraisal Rapts 30-295/90-0& fc
BO-304/BO-04 on B00310-21 Noncompl i anc e noted aignlficant
Mohniicis found tn areas reflecting on mgt Ei mgt support
UaahneKxiR in emergencg response l< accetB control
BCHUrlACHER,M, C , MILLER, D E Region 3, Chicago, QFPU» of the
Director FISHER, H L Rogion 3, Chicago, Fuel Faculty &
Materials Bafetij Branch BO/Ofi/33 SBpp
6O073 10333 Forward s Watt* Packaging Insp Rept 130OQOWQO-3Z Bn BQQS32
i. Si
DAVIB.A B Region 3, Chicago, Fual Facility (k Materials Safutij
Branch BO/06/3O 3pp
GRflEBEER, K L
rdi LEU aO-
Commonwealth Ellison Co
B0073aO193 LEfl BO-03a/03L-0 on B00fjl6, fuel oil storage tanfc l»we)
found 300 gallons less LhflD 40,000 gallon limit Caused by
engnmering assistant riot anticipating fun! consumption
associated u/die$el generator testing every three days
T Commoiiiuealth Edison Co BQ/O7/I4. Ip
3007220399 LEit BO-007 hat been cancelleil
COLL1NS.M Commonwealth Ed I tun Co 80/07/S1
—8007310339 Waste Packaging Imp Rept lSO-0004d/aO-33 on 800332 J. at
Noncompliancc u/DOT riQUlat ions noted man dovv rate on
surface of transport trailer ua& 220 mlliirain/h
D'REIULYiL A Ragion B, Ban Francisco, Office of the Dir&ctor
THOMAS, R D , BdQK.H E Region 9. Ban Francisco. Fuel Facility t,
M»t*rij>li Bafetg nranch BO/OA/OS lEpp
0007220^00 LEfl HO-006 has been catirclled
COLL1N3.M CornmoPueHlth EI<I I son Co BO/07/21
B007320401 LER 80-004 has. been cancelled
CQLLINS.M Commonuiealth Ellison Co 00/O7/21
6O073 10339 Waste Packaging Imp Rept 1S000016/QO-:IS on BOOE22 b 2
Nonconpliance u/DOT rvgulatloni noted mat dose rate on
•urface of tram port trailer was 230 milllram/h
O'REILLY, L A Region 3, Ban Francisco, Office of the Director
BO/04/OS 13pp
eoO7Q9DA41 Reipanda to IE Bulletin BO-10. "ConSaminatlDn of
Nonradioactive 3yi fc Reiulting Potential Pa-r Unmoni tdredi
Uncontralled Rileaie of fiadiaact ivitij to Environ " Any
• •ffsctffd BV> will tn restricted if contamination Found
PEOPLES, D.L, Coimnonuiaa 1 th Edison Co BO/07/07 Spp,
flOO7E2040a LER 77-O7S has been cancelldU
CQLL1MO.M Commonuealth Ediaon Co
6007320404 LER 7<t-Q&7 has been camelled
CQLl.IN8.il CnrnfTianneolth Edison Co 80/07/JM
fl0072S010S LER 79-064 fias b«on cancelled
COLLlNa.M Cunmionuiofllth Edison Co HO-/O7/H1
B007230345 LER 90-0 Oj has been i ,nic el Ipd
COLUINa.M Commonwealth Edison Co flO/07/23
112
DOCKETED ITEMS
6OO723O347 LEfi 79-OB? has been cancelled
COLLINS, M Commonwealth Eflison Co BO/O7/a2 Ip
SOO723O331 LEH 79-OSR has been cancelled
COLLINS. M CDmmonuDalth ErlisonCo £30/07/33 !p
8007330-333 LER 79-OB& has been canrelletf
COLLINS. M Commonwealth Edison Cu BO/07JS3 1 9
6007080330 Responds to NRC 791002 Itr to all BUR licensees Bi 771031 Itr
to util Util Funds, allocated For Mark I owner i group
Full-scale teat facility program Schedule for completion of
plant-unique ana ly Bis forthcoming
MILLS, L M Tennessee Valley Authority 80/O7/01 Ip
BOD72IOOIJ6 Forwards request tor iiddl info to complete review of
containment purging & venting at facilities
NOVAK. T M Assistant Director for Operating Reactors SO/O7/OB
B0072303'i7 LEfl 79-OBQ has been cancelled
COLLINS, M Commonwealth Edison Co 90/07/22 Ip
T Hearing transcripts on nr-n-ant i trust matters
6-0071500-24 Transcript of B007O1 morning d earing tn Kt theada, MD Pp
1-120
* Atomic Safety ana Lie-ending Qoard Panel 80/07/01 133pp
DOCKET 50-294 DRQHNb FERRY NUCLEAR PCWEfl STftTION, UNIT 3
F Security, medita!. emergency f, fire protection plan-s
0007310024 Forwards list nf vital areas & equipment TB&U! ti-ng from
Vital area analysis condiKted at facility R computer
printout containing supporting data for vital arts analysis
Ends withheld (re* 10CFR2 790)
IPPDL1TO, T A Operating Reactors Branch 2 90/06/^0 Sop
0007320029 confirms that LAEL mill conduct vital area analysis of Units
2 ti 3 on B00714 E Clalbpurii? T. J Rand uilt can-duct visit
IPPOHTO, T A Operating Headers Dran-ch 3 GO/07/03 2pp
BOO 7320376 Forwards proposed changes to ETB Section 3 1 ru thermal
d i scharge limits
MILLS-L H Tennessee Valleij Authority BO/07/14 Ip
— B00723O3/7 Propose-d change to ET5, Section 2 1 re thermal discharn*
limits
<t Tennessee Valley Authority 80/O7/14 Ip
S007310531 Confirmo 900713 concuri-ence u/util schedule for rotornlng
to pouer operation Concurrence based on util completion of
correctivo attiDn* re failure of control rod age FolloiilinH
manual trip
O'REILtV.J P Reoion H. Atlanta. Office of the Director BO/O7/14
2pp
B007340325 Foruards CWiendi i, 1 , 36 & 33 to Li conies DPH-33, DPfl-52 b
DPR-68. respet 1 1 vely a notice of 'issuance & availability
IPPOLITO.T A Operating Reactors Branch 3 BO/07/13 3pp
— 0007310231 Amen-da M . 36 (. 33 to LicensbB DPR-33. DPR-33 .t DPH-6B-
respect! velij. chang ing Tec-h Specs re thermal discharge
limit*
IPPDL1TQ. T A Operating fioactors Branch S 80/07/19 13pn
0 Adjuditatory cniresp ondenc p
80073102-43 Forward's Commission BOO 527 memorandum, E< order containing
decisions an UCS 7HO3OS pelition for reconsideration of
7BO113 iuBmorandum !, order UCS 77I1O4 petition anught Hction
re Pire protection for electrical cables
EISENHUr, D G Division of Licensing BQfQbJSS H9pp
H General corr*spandenco
B0071703BO Enprosiea inncern re plans to construct lou level uaste
storage !c incineration facility Proposed Faclliti] mould
present significant Jieatth risks to highly populated area
Requests public hearing & FIS
HOLLINGSUPttTH AFfiliatLon Unknown BO/07/09 Ip
— BOO 72 4 0234 Notice of issuance Si availability of Amends 61,36 fc 33 to
Liconsei DPR-33. DPR-5B (. DPR-<bB, respect! vely
IPPDL1TO, 7 A Uperating Reactors Branch S BO/07/15 Bpp
Q0073003B'! Respond-s ta encl B006OS nemo re lou level uaete mot at
fflclllty Util plan-s to construct tuo separate lou level
unite fncilitioB omite Con«t on first four cubicles began
recently MltC approval of pljins necessary
DENTON, H R Office of Nuclear Reactor Regulation, Director
BO/07/23 Bpp
— 8007300391 Roquests summarg at util plans to build lou level waste
storage facility Also requcste uih other NHC approval IE
required J< uliether public hearings have been requested
UtMBFORD,PA Commission BO/06/05 Ip
Insurance fi iTidemnitg Lnfnijnatlnn
Inspection repo-rts> IE Bulletins & correspondence
B007-O1O516 FarwaidB Eniloriement 31 to AMI Policy NF-19B
FIELDERi J Harsh R HcLnnnan. Inc . Ml d M Nirclear ConBultantsi Inc
Div
8007240009 Fo-ruards IE Info Nntico BO-3O, "Loss of Decnu Moat Removal
Capability at DJIVI S-QBBBS Unit 1 Uhlle In Refueling Mode "
No response ruqiFired
O'FIEILLY.J P Region S. Atlanta, Office of the Director BO/OS/08
B00731O136 Forwards Endorsement 4H to MflEt-U Policy MF-66
FIELDER. J Marah t, McLennan, 1 nc . K (, H Nucleur Contu 1 tants, 1 nc
Div BO/07/21 app
P Operating lic-ense stag? documents I< corr« spontlBinc e
SO07I40476 ForuarJa IE Bulletin BO-13, "Cracking in Core Spray
Spargero " Written responfie required
D'REILLV.J P Region 2, Atlanta, Office of the Director BO/03/ 1 a
IP
BOD7S3002B Summary of S002O7 meotkng u/Marl I oiunei B sroup Ln Betliesua.
MD.re revisions to HRC acceptance crltcrin t< auistatiiJ Infl
Issues relative to Mark I Lonta inmcnt lang-term prodrcm
CRIMEB.C T Plant Easterns Branch 80/Oa/Pl 31pp
8007070269 Responds to 1)00123 ] tr re use of DDVN code in determining
nperating limit min critical power ratio Util r onus at*
further clarification of pjpe-cttd jicnaltics that may be
imposed on top of ODVN calculations
MltLS.L M Tennessee Valley fliithorl tij aO/&3/Pfi 3|>p
B007030711 Besponns to S00fl29 Itr re low level waste mgt at plant
Ultimate util objuctivE is to provide for onsite rfli/uaste
storage No target tfatB hat oenn establlihed by TVA for
submitting applitatipn for incun-t-atjon appr-ovat
NOVAK. T M Assistant Director for Operating fie net or 5 HO/06/HS
3pp
B0070B02S4 ftesnand-s to NftC &QQ5U3 request for faclSltij partltipatl on, In
phase tun Interim fteliabi li i,ij Cvslunlion Program Urges
definitive conclusion of phase one bufore continuing Outline
of critical areas to be Tesolveil end
MJLLS.L M Tennessee valley Authnrtty OO/OA/30 Spp
BOO7020193 Foriunrda IE Info Notice BO-33, "Oreakdouins In Contamination
Control Programs " No uinttun response required
O'REILLY.J P llegion 5. Atlanta. Office of the Director BO/03/HB
H007010Pa3 Fnruarda IE Info Notice 80-33, "Loss of Suction to Emergency
Foeduater PIT nipt " No written response required
O'REILLY. J P Rrgian B. Atlanta, Office of the Director 00/03/39
roruards IE Info Notice 80-56, "Evaluation op Contractor
OA Prngrom-a " No written reeponEe i equired
O'REILLY, J P Region S, Atlanta, Office of the Director (30/06/10
3pn
Q00714030& For ua rift IE Ilulletin 30-14, "Degradation of 13 WR Scram
Diacharg-e Vol Capability " Written response rsquired
O'REILLV.J P R e(f ion 3> Atlanta, Office of the Directar QO/Ofa/12
8007020499 Forward* response to 1C Bulletin SO-09 transmittad
JP O'licilly 3D0417 Itr Final rept for Hartsville b Poippa
Be nil plants ui 1 1 tm sent on or before 801017
MILLS, L M Tonne a se* Valley Authority BO/0&/H, 2pp
DOCKETED ITEMS
BOQ70207&1 Forward* IE Bulletin BO-13, "Possible Loss of Emergency
Notification Bya (EN8) W/LOBB of Dffslte Pouer " Written
r»»|ion»e required
O'REILLY. J P Region 2- Atlanta, Office of the Director BO/O6/10
B00725059& Forwards response to Itorn 1 of III DolUtui BO- 1 7 re uater n
scram di 5c hcirgti vo 1 No signifirant amount of matur uas
found in discharge vnl ", a 5 toe ] ati?d piping Scram discharge
vent valves are ciperabli
CROS6-J L. Tennessee Valloih Authority 8O/O7M1 2pp
BOO703O391 Forwards IF Circular BO-I5, "Loss of Reactor Coolant Pump
Coollnu b Natural Circulation Cooldoun " No written TBBponse
roquir»d
d'nEILLY.J P Region a. Atlanta. Office of the Director SO/06/aO
IP
B0073100i!i7 Foi-uardE iGCond interim rept in responsE t.o IE Bulletin
BO-Oti BinLe BQ0613 Interim rept.gtij completed review of
primary containment Bys.rtiittor protection iua.FlHP sys r=
COTE spray sys Fvaluation uf othei SIJE uiidp-ruiaij
CROSS, O L TenneSGE* Valley Authority QO/O7/11 2pp
BOO731Q344 Forwards IE Insp Hepta SO-239/BO-25, 30-260/80-19,
3O-296/BO-20 t. 90-3S7/BO-3a
O'REILLY, J P Region 2, Atlanta, Office- of the Director eO/Ot/33
3pp
SOQ722u'}2a Requests intension until Boom 1 fisr ppr Forming manual
automatic scram required 0 ij IE Bulletin 00- 1 7 t£i tension
needed because of torrent heat wave
MILLS. L M THnneSGce Valleij Author itij 90/O7/16 2pp
— 0O073 10351 IE Insp Repts 5O-259/BO-23. 50-260/SO-19. 5Q-29i!,/BO-HO t,
1)0-327/00-23 on B00321 Insp consisted of enforcement meeting
In Atlanta, OA to discuss uncoed ing DOT radiation limits
during shipment of raduiaatB from Brouins Ferry
DAMCEiH C Region 2, Atlanta. Reactor Operations NucUar Support
Branch BQV06/2O 3pp
BOO717O070 Forwards IE Circular BO-11, "Radioactive Contamination of
Plant Deffllneraliied Uator Bge It Resultant Internal
Contamination of PBreonnel " No urltten response required
O'REILLViJP Region 2. Atlanta, Office of the Director 80/O6/24
B0071BOS23 Forwards renponse to IE Bulletin 79-H7, "Loss of Non-Class
IE Instrumentation & Control Power Sys BUB During
Operation-" h tn GOD4D4 confirmatory orders Feeduater pump
turbine & main turbine trip circuitry uill bo upgraded
MILL8.L M TennossBe Valley Authority SO/06/26 Spp
B00731020B Tgruardft re&ponsfc lo Items S (Unit •3),4.5,6(c> fc 7 of IE
Bulletin BO-17 Prt-sent staiidhy liquid tnntTol ays design is
unable to support tun-pump floiu hut iys is equipped u/
interlock ing contacts Item B fnr I/nits 1 t< 3 uill bo sent
MILLB, L M Tflnnesscp Vallei| Authority aft/O7/lfa lOpp
6007390357 Grants Eilension of timt to BOQB11 for ptrformmg s-cram
tests per IE Bullptin DO-17
EI3ENHUT.D 0 Division oP licensing BO/07^IB Epp-
BOO7300373 Forwards response to IF Bulletin 79-01B. "Environ
Qualification of Class IE Equipment " Suirinqrios at pquipwent
Hual I Pica tton eva 1 uatl ono. based on Fuel 1 Lr i tena» enc 1 Full
response mill be forwarded uhen fvalua t Inns cnmplete
MILL9. L « TenneaBEB Valley ftuthonty 80/O7/1B 51pp
R Periodi!: operating reports i, reltitud corrotpondenc
8OO7230S33 Forwards IE Bulletin BO-16, "Potential Misapplication of
RoBinmunt Inc Models 1151 & 1152 Pressure Transmitters
H/Elther A or D Output Codes " Written response required
IE Circular- BO-16 also end No written response required
O'REILLY, J P Region 3, Atlanta, Office of the Director BOYO6/E
lp
BO07aiOO'?l Forwards response to IE Dulletln BO-1O Potable ualeri
mineral i leit uater It auxiliary boiler sy& have possible
interfaces bstiunen nonradioaclive t< radioactive SUE Routine
• •mpling b armlyiis program eatabliHhed
M1LLB.L M TcnnessDc Valley Authority BO/07/07 3pp
80072201fl3 Foruarils "Effluant '. Uastf Di-ipo
supplemental info For second half 197B
DEWEASE, J G Tornessee Vallsy Auttmrilij
l Semiannual ttcy t, "
79/03/15 lp
"Effluent t. Waste Disposal "Semiannual ttept. "
infn for sacond half 197fl
* TennesBBc Valley Authnnty /V/Od/lS ISpp
900722034H Forwardt "Effluent t. Wa^te Ditpoojl Sepniannual Rfip
sopplninentj] info, first half 1979
ABERCROMRIE.H TonriBSSEE Valley ftntlontij 79/OB/ 17 lp
60)07230726 Forwards monthly status rept re IE Bulletin 79-14. "Seismic
Analysis for As-Built Hafcly-Rplaled Piping Bys. " presentina
•tatut of uork an of BOO701
MILL8.L M Tennessee Valley Autliority BO/07/07 29pp
BO072B061S Responds to IE Bulletin BO-OB, "Examination of Containment
Pen »t ration Welds " Results of investigation end
HILLB.L M Tennessee Valley Authority SO/O7/07 Spp
aOO7210JO3 Forwards responsa bo IE Bulletin 80-11 Ide-ntiflea maconri)
UBlll that support or are near saf ety-related sya Submits
• cliodule for re-evaluation program
CROSS, J L Tennessee valle<j Authority BO/07/OB 3pp
8O07BB0460 Ae k receipt of B0061i 1 tl- informing NRG oP ttops Latfln to
correct violations noted In IE Inap Repts 30-259/80-EO,
30~2iO/0Q-19 fc 30-296/BO-U
LEWIBjR.C, Region S, Atlanta, Reactor Operations Nuclear Support
Branch BO/07/OV 2pp
— B0073B046B Responds to NRC B009HO 1 tr re violations noted in Insp
R«pta SO-339/flO-ao. SO-SiO/80-13 t< 30-396/ao-li Corrective
Jicllon* calibr valve orientation (.orroctad Justifies
decision re nonrcporting of dcisel genrator failure
MIULB. U M TenneaBoe Valley Authority 00/06/14 4pp
— 80073S047S Foriuarda IE Insp Reptfl SO-E99/BO-HO, 30-3AO/BO-13 fc
30-29i/BQ-!c. on B00405-OS02 & notice of violation
LEWIS,R C Region 2, Atlanta, Reactor Operations Nuclear Support
Br*neh 80/05/20 2pp
— BQ072203<16 "Efflupnt fi Waste Dispos.il Semiannual Rept." supplemental
infn, first hal P l*)/9
« Tennessee Valleij Authority 79/OB/17 Ifcpp
BOO7220131 Forwards "Effluent ;< Waste Diipo5rtl Semiannual Rept,
BupplBmental InPo.Setond Half 1979 "
ADERCIIDMCIE-H TnimesttBe Vcllog Authority 30/01/31 lp
— B007?30"191 "Effluent & Waste Disposal Semiannual liept, Supp 1 ementa 1
Info, Second Half 1979 "
• Tennessee Valley Authority 00/01/31 16pp
fiO-07160392 Foriuaii-dE monthly opeiatin^ repts for June 19BD
ABERCRQMOIE,H L Tennessee Valli'iJ Authority BO/fl7/lO lp
— B00716053fa Monthly operating reptu fur June 19BO
THOM,T . OREEN. I» Tennessee Valley Author >lij BO/O7/OE 32pp
8 Reportable oiuiiTranc BB, LERi Si related carrcspDiiderc e
SOO701O37O Foruiards LER 80-019/031-0
CA1.HDUN. J R Tennessee Valley Authnrity BO/Ofi/i'S lp
— B007O1O3/7 LER -BO-0 19/03L -0 on BOOB27. riuv i ng normal operation,
discoivured diijucll tump floui trunsini tter FT-77-l/i had output.
signal shift Caime unknown Transmitter replaced *( instrument
loop calihr
» Tennossee Vallei) Authority aO/Q/i/SI ?pp
-00017300170 Notice of violation from insp on B004OB-Q9Q2
* Region 2, Atlanta. Office of the Director BO/05/20
B0070S0415 Fny-uarilE I EIJ BO-O23/O1T-O
CALHOUN, J R TennflHare Valley Authority
-0007330484 (E Insp Repts SO-HS9/BO-SO, 90-HtO/aO-lS «. 30-S96/BO-16 on
8004QS-OSOB Noncnmnliance noted failure to adhere to
»urvelll»nce Instructions !. to make prompt rept ta NfiC
SULLIVAN. R F , CHASE, J H Ronion 2, Atlanta. Office of the
Director. DANCF. H C Region ?. Atlanta, Reactor- Operations
Nuclear Support Branch 00/05/20 7pp
— 8007OBO4J6 LER BO-023/01T-Q on 800617, din ing normal op erati on-
Dresser Indus-fcr i na safety valve mas discovered u/rrarkE in
guide Caused by initial pouriny of casting Ii muling Spare
valves mill be ItispBcted ft>' cracks
* Tennessee Valley Authority 00/06/30 2op
114
DOCKETED ITEMS
AHEnCROMIUF, H 1
1 55-PO VaLleij Author Itij
B0073-10256 PNO-1 3-SO-l 19 on lUK'dSB. Ib, control rods failed to f u I 1 ij
insert During ruuCine shutdown Manual isirams failed to
effect: repair Autn scram cei'seil -full insertion Causu being
investigated Confirmation of jclinn Itr i-sautd
JULIAN, C , LEWIE.R C (legitm E. Atlanta, Office of tlie Director
BO/06/30 3pp
BOO711O37B Forwards LfcH BO-O^O/oaL-Q
CALHDUN..I B TunneEB-PB Volley Authority BO/O7/03 lp
— a00711O3BO LEU BO-OSO/QSL-O on B00409nl ur ing normal operation*. 3D
dinse] generator auiiliaty 01] pump motor tripped tultc
Caused by failure nf Hoover MuilBl &2O3i sealed bearings
Motor replaced Hearings vopliicpd »voi y tuo ijrs
B Tennessee Valley Authority 80/07/03 2pp
BOO711Oa0S Foruards LER BO-O.M /O3L-Q
CALHOUNiJ It Tennessee Valley Authority
— 9007140555 IE Insp Re-pt 50-297/60-01 on B0060S No noncorop 1 iance noted
Major areas inspected licensee security p Ian. securi tij
organt latinn. at ce ss centre 1, survei 1 lance d protection
against sabotage Details withheld (ref 10CFR 3790)
HOWELL.J C . GILLESPIE, F P Region 2. Atlanta, Offico of the
Director BO/0&/E5 lp
DOCKET 90-29H t ROPER NUCLEAR STATION
F Security medical, emergency 5r fire protection plans
BO07230713 Ac k receipt of utU 800336 Itr transmitting Revision 9 to
physical security plan End to utll Itr withheld (ref
IQCFflS 790)
IPPDLITQ, T A Operating Reactors Di anch 2 80/07/07 3pp
0 Ad jud i calory cor
:p ondenci
BO/ 07/03
BOO731O243 rcruards Commieston BODS37 mamorandum & order containing
•deciEions en UCb 7BO9O2 potition for recnnsiduration of
7B0413 nemnranJuin & order UCS 77110') petition sought action
re- Mro protflctinn for electrical cables
EISENHUT, D 0 Division of Licensing 80/06/25 B?pp
— BOQ711031?'' L£R Bfl-Oai /Oil -O on B00609i during normal operationp r paet-or
carir isolatitin taoling turbine tripped on ovornpeed due to
loss D* speed control Caused bij f,i>lurB of voltage
suppressor CR-Jitype S-24Oiin FGM hoi
* Tennessee Valley AuthDritij HO/07/O3 Blip
0007340260 PNO-I1-DO-11VA uprl.itei PNa-II-flO-1 19 Cause of 76 control
roils not fully iniertino. after BOU62B routine shutdoun still
riot dBtermin-ea No bltitka(je found in Bcram discharge piping
Addl flau test-; will f amp am drain capab 1 1 it i es
JULIflW.C : l-CWI&.H C Region 2. rttliinta. Office- of the BiroctnT
SO/07 /03 !p
B0071BO3O1 Foruards LER BQ~O22/O3L-0-
CALHOUM. J n TcnnESaee Valley Authority
— B0071BO314 LEU (30-032/O1L-O on SCORIA, uih 1 le pBrforml rts SI 1 1 (S-l-3.
turbine f i rat -i t.-jgc pri's-suro permiosivi?- t, (ir&EnurE swifc-cheB
TS-1-91 A t, n exceeded limitt, Caused fcy Botpolnt driFt
Sui tches rocn 1 i tir
B TennesiEB Valley Authontij HO/07 /1 4 2pp
ar<)5 LtTH BO-O21/01T-0
TennesEeD Valleij Authority
P Operating licence stage documents ti correspondence
D007H3002B Summary of SQQ3Q7 meeting in/Mark I owners group In Bethesdfl
HDi re revisions tu NRC acceptance criteria tt outstanding
IB»UBE relative to Mark 1 containment long-term program
T Plant Suatems DTanth 90/03/31 3lpp
CAt-HOUN, J fl
D0071401QO Forward 3 Amend 63 to License DPR-46 li notice of Isauanco tt
availabllitg
IPPDLlTOi T A Ojierating Ruactorc Branch 3 00/06/21 3pp
— 30071 404 B6 Amend A3 to License DPfi-16 modifying App D of T*ch Spaci
tu delete Section S i 1/3 1 1 Section is superfluous to
raiui remonlt in Section 3 i 2 ra man thermal discharge temp
IPPOL1TQ. T A aperatina Reactors Branch S QO/06/21 3pp
— SDC>7l104Vie! Notice oP issuance 6 availability of Amend 63 to Lictne*
DPR -46
IPPOLI7O, TA Operating Heactors Branch 2 80/06/24 2pp
B0071&0440 Submits statue. & schedule for completion of Mark 1 program
iDDdo at Facility far H/JC telcon request
PILAMT.J M Nebraska Public Power District SO/07/10 2pp
0007290H29 LEH Bu~Oa4/01T-0 on Q0062Bi uh en reactur was manuallij
acramraed, 72 nf 1V5 •CD.iitro! rodi failed tn ftilly insert
frobrible cau*>e due to water in scrum ri i ^charge vol
Investigation in progress to drle-rminc [Directive action
» Tennessee Vallcij Authority (IO/07/1B 2[ip
3007290695 Fnriuarrfs LER BO-02S/03L O
CALHQUH.J R Tennessee VaJlou. fli.thority
— B007a9O70S I.ER flO-02R/l>ai--O on aUQhSI, dur i ng nnrmai Dp&ration.
continuous, heat detector dnmogect !- caused false alarm Caused
bij accidental damage to licat detector bij pevEC-nnnl
perForming mods in area Craftsmen cautioned
* Tennesite Valley Authority SQ/07/S4 2pp
T Hearing transcripts on ncli-antl tru&t matters
B0072ilO371 Transcript nf HOO7O3 liriPfinj bu NflC on Por 1 1 i ty Pp l-9fl
" Commissinn 90/07/03 Glpp
8007E40091 Transiripl of BOO? 1 5 briefing on llfltus of PncititiBB in
Uaihingt-on, 1JC Pp 1-21
» ComraiiBion HO/07/15 e'lpp
DOCKET 50-297 NnHTH (.AFICLIWA B1ATF UM1V PULBTAR REACTCR
Q Inipetlion reports. IE Bulletins tt c orrcsp ondenc y
B0071701A4 Forwardt IE •Tirculai QO-14, "Rad joac livif CantHmlnati an nf
Plant DertiltieraH led Water EiuB !i Resultant lnternn-1
Contamination nf PersnnnBl " Wn written reaponsif required
O'REILLY, JP Region 3. Atlanta, Officn Tif the Oiroctor BO/06/3'1
B007H0343 FdrKanls IE Insp Rept 30-P97/BO -01 on HOOfaOS No
noncomp 1 ianc» ntited
KENNA.W B Reuion 3, Atlanta, Safeguards Hrnnch !30/06/H1i
3007240333 Faruarila -Pages. 193 ft 194 to be inserted in facility Tech
BpflCa PflgD3 i.f?3a I. W4a issued ill/Amends 43 % 49 are
redundant & should be removed
IPPOLITO, T rt Operating Reactors Qrancli 2 BO/07/14 2pp
— 0007340299 Tetli Specs Pages. 193 !< 194 re limiting condition* for
operation !> survff i 1 la-nco rpquiroments for auiiliary
el ectri cal •ago
M Nebraska Public Po-uer District 70/05/02 2pp,
8007280452 Application for amend to License DPH-46 deleting Tech Spec
3 1 3/3 1 3 re ma* discharge tempi in response to Region
4 request Amu rid foe was submitted id/previous Tech Spec
change request
PILrtNT. J M Nebraska Public Power District BO/O7/U 3pp
— 3007380467 Ravlsed Tech Bpees delating Section H 1 2/3 1 2 re mm
discharge temp State pollutant discharge permit oncl
» Nebraska Public Power District SO/07/16 9np
Q Insji oell-on reportai IE Bulletins t- correspondence
B 0^0714 0-963 Foruards IE Bulletin SO- 13. "Cracking in Core Bpray
Spargers " WrJttrn r-BBponSB req,uired
GEYFUIT.K V Itoglon A, Delias. Office of the Director BO/03/13
£1007030199 Responds to IE Bulletin 80-09 re hydramotor actuator
deficiencies Bi < Model AH-9O &/or NH-90 Series hydramotor
actuators are used at Pad I i ty, Mone UIHS springs made &/or
installed betuieen Bopl 1975 t< Jan 1978
PILANT.J M Nebraska Public Power District 80/05/30 lp
B007100Q16 Updates response to IE Bulletin BO-07. "DWR Jet Pump
Atnemgli) Failure " Licensee will perform surveillance
requires by Tech Bpc-cs b surveillance recommended hi; CE
Instaaif of prnoram outlined in IE Dullelin 00-07
PILANT.J M Nebraska Public Power District BO/09/H1 Spp
115
BOO702O26B Forwards IE Info Notice BO-22, "Breakdowns !n Contamination
Control Programs " ND written response required
EEYmiT.K V Region 4, Dallas, Office of the Director GO/O5/2H
B007OIO04B Forwards IE Info Notice BO-23. "Loss of buction to Emergency
Feaduator- Pumps " No written response required
V Region 1, Dallas, Office of the Director BQ/Q5/P219
— anO70F303/!H LFFi 8O-CH1/ OJL-0 on BOO5 1H, mil i If pei forming SP t> T
re lay 1 4A-IWH mas found dc-cnerglMd, (ire vent 1115 start of
core so rag pi>np on not frr&l puuier £iu|iGFfloii5 i oil t«r t s ue-re
inadvertently left comicctea i n tflre spiay pump circuits
BEDNAfi.L F Nebraska Public Power District aO/Qt/16 lp
BOa72D03B4 Forwards LilR EfO-
LESSOR. L C (J[br«i&kfl Publn I'o
BQ07aiQ132 Responds to IE Bulletin BO-13. "Cracking in Core 3prai|
Spargers " No cracking found during insp of spargers &
••gmont of piping between inlet noiilp J< vessel shroud
PILflNT.J H Nebraska Public Power District 30/05/31 lp
— BQO73BO5<?;> LEU SO-OIS/OJL-O an BOOitMi. duriri!) control rait scromtlme
testing, Full-in lontrol rail!, i IILOTI-OC 11 ij scr arametl '. fully
LI i thtlT awn ^aii-ed bij parsOTincl LTTUT Rod returned to correct
position ProcPduro modified
BORER. P J Npbr.i5(<-i Public I' C.DCS District HO/D7/Oa 2pp
B007030333 Responds to IE Bui 1 cti n, 79-03. "Pipe Support Daaa Plate
D*s.[gtii Ualng Concrete Eipansion Anchor Bolts " Lists
hangara tn be rEpaircd
LESSOR, L C Nebraska Poblic Pouior District 80/06/O3 3pp
8007130135 Foruards IE InGp Rept 30-29B/BO-OB on 300506-09 It 19-23 Mo
noncamplianca noted
H&DSEN.G-L Region 4. Dallai, Reactor Construction H EnginBBring
Support Branch 00/06/06 2pp
B00715070S LtR 79-OJ1 has bee
COLL1N3,M Nelir-aika Public
?r District
B-007250501 Confirms UOO7 1 0 tBlcon re terap Hici'pUins limit of IOJ F In
Fatility discharge canal on BOO /U9 Periodic noncomp L Jdnc.es
BipBctoi as long d5 hot tiie^tticr rreatos ihtrcased demand for
Full pounr operrtt i o.n Tabulations for B00709-16 one 1
COOPER. L J Nebrdhk.i Publir Ptupr CiEtnct SO/O7/1B 3pp
— BO0715ai3b IE InBp fiept 30-398/BO-09 on B00506-09 !, 19-33 No
norK amp] lance noted Major areas inspected pro-viousl y
iiontified itamS' refueling activities, survsi 1 lance, pipe
suppnrt ti restrainl sys.maint Ei leak rate teat
UEBTERMAN.T T , 8PANBLER, R 0 , TAPIA. J Region 1, Ballai, Office
of the Director SO/O6/06 Bpp
OO07H2O12O Forwards. IE Info Motice 90-26, "Evaluation of Contractor
QA Programs " No yrittan veaponfie required
SEYFRIT.K V Region 1i Dallas, Office of the Director 60/06/10
B007140410 Foruavda IE Bulletin 80-14, "Degradation of BHR Bcrarr.
Discharge Vol Capability " Written response requireil
BEYFRIT.K V Region 4. Dallas, Office of the Ulrector BO/O6/1B
IP
60072-10031 Forwards IE Circular SO-1S, "Locs of Reactor Coolant Pump
Cooling b Natural Circulation Coo Id own " Nn written rosponan
roquirad.
BEVFR1T.K V Region 4, Dallas. Office of the Director 80/OA/EO
DOCKET 50-301 POINT BEACH NUCLEftf! PLANT. UM1T 5
F Security, modital, emeraBncy 'i Pite pr-otection plana
S00730044O ForuiariJE emerjentij plan, revised [Iraft.Jul 19BO
FAV, C W Wisconsin Electric Pcmer Cu 30/07/SS lp
G Ad judi-catnnj con-esp nndunc e
D007310343 Forwards CnramisBlon BOU527 merior aildum t<. ordsT containing
decisions on UCS 7BO502 p-etvUon tar recanc i dora ti on a?
7E3041C! m»mordndum !. nrder IJCU 771104 petition sought flrtion
ro firn protection for eluctrital cabJoa
EIEENHUT.D G Division i)f Hrpnsmg uO/Ot/^5 B9pp
BOO7210A43 CnrTectcd notification that BV03JS pistition 16 domed
Forwards BOOA10 FR not ICH. DkreL tor ' s decision under
10CFFI2 206 l< rfflatfif SERB
DGNTON.H R Offltn of Nuclear Reactor Reoxildtion: Director
aoyc-7/io ip
R Periodic operating reports & related correspondence
0007090391 Forwards monthlu operating rept for June 19BO
LESSOR, L C Nebraska Public Power District BO/07/01 lp
— B007OB03'?9 Monthlu operating ropt for June 19BO
BELLINGER, P L Nebraska Public Pouier District BO/07/Ot 9pp
B0073S0421 Foriuarda eort-ectBd monthly operating ropt for June 19HO
LEBBOH.L C Nebraska Public Powar District BO/07/1Q lp
— B00733D4S5 COT-rectod monthlu operating ropt for Juno 1VBO
HALLINQER-P L Nebraska Public Pouer District 80/07/01 3ff
— BOO7210Ai15 Hotue of issuance of Director's detiEion under lOCFIfa
denying Wl Envimn Decdde. Inc RCC-312 petition
DENTaN, H II Office of NncSorir He^ctoi Regulation. Director
OB/06/iO lp
— 90072)0^47 Birettor's der)5iDn under lOCFR^' SQi> denying HI Environ
D-B-tade, Inc 600312 petition fur ihoiii cause avder !i ordBT
enjoining operflticn of far i 1 i ty duo tn steam generator tube
degradation
DENTDM. H 0 [Iff ice at Niiclcm Reactor Runulii t ion. Director
60/06/10 9pp
— SOO721Oi49 Safetij cva 1 ua 1 1 on IB stp.in gpnerator tuhP degradation
supporting cnntirmed cpuration nf Fiicilitif
* DFfi.ce of Nurleiir F<*actor Hcijiilsti on. Director BO/07/1Q
lOpp
B Haporlable occurrences. LEHs & related corraspondence
BOG70BO393 Foruards LER 80-QI2/Q3L-0
LESSOR ,L C Nebraska Public Power District aO/06/13 4pp
— 0Q07OB0302 LER BO-Q12/03U-0 on 800331, durini) local l*ak i*ate test, nine
penetrations found leaking excessively Caused by normal
wear Seal ring replaced, seats pol ished, pac k ing tightened b
ring seal cleaned
PHILLIPS.D L Nebraska Public Pouor District 80/06/12 lp
H0070fOOO5 Forwards LER BO-013/03L-0
LESSOR.L C NebrasHa Public Pouier District DO/06/13 2po,
— 8007090007 LEfi FJO-013/03L-0 on 800916. during aurvoillance procedure on
primary containment isolation valve timing, HHR discharge tn
Tad waste inboard Isolation failed to close in time Caused by
failure to check strole time after malnt
DOAN.P F Nebraalia Public Pouier District BO/Ofi/13 lp
0007200477 Ac k rocupt of directurK' HOO710 derision TO facility
Attachmonts to dacisuin jumlili/il RBquests compJete -iot of
at tachttvE-ntE
FALK.K H Wisconsin's Environmontal Dei adp uO/07/14 lp
P Operating liceiiso
document! tt corrDSipnnflunc
Foruarns LER BO-014/03L-0
LESSOR, L C Nebranka Public Puuier District 80/06/16 app
0007330O79 Renuests submittal oF proaos&d TPC h Spec changes pTO-vidinn
for redundancy in decay Seat removal capability in all iiadol
of operation Model Tech Spots which would provide acceptable
resolution one 1 For guidance
EI5ENHUT.D 0 Division at- Licensing 80/06/11 6SpP
3007090230 Notifies that four WeE 1 1 iigh nuse demo it strati on optimiieil fuel
assemblies ulll be lodded *n Cyila S tore rturvng M=i) I'JBl
refuelinu shutifiiwn Reload safBlij eva 1 uat ion ti> be pprfniNnsnl
per HCAP-^H72> includ ins aBBBSBment of core impact
FAY.C U Wisconsin Electric Pnusr Co 80/07/01 3pp
BOO717058S Forwards evaluation of cnntlo) rod guiiie thimble wear in
facilities tlesignuri by Uastinghouse Based on ravl eu, issue
is reBolv-B*
CLAFW.R A Operaling Reactors DrancK 3 00/07/01 4pp
116
DOCKETED ITEMS
8007250001 Requests -.ubmittal of application for amend to license
consisting nf Tech Spec changes tt IICBHEE cond i tions PWR
MDtfel teed Specs r, Mndsl license conditions for TMI-H
Loasons Learned Category A items end fur guidance
EISENHUT.D 0 Division n f Licensing BQ/O7/<'2 fc9pp
30071*0757 Responds to IE Dulletin BO-Gi, Review conducted of B
drauings to determine actions ronulting from enfl a neered
safety feature actuation signal t< whether equipment returnod
bo nonemBrgoncij mode upon removal of actuation signal
FflY, C W Wisconsin Electric Poiuer Co BO/OA/Oi 2pp
B007 1 3Q£,-JB Requests eitension of comment period on NUHEG-0377 until
BuO.915. dut to other work efforts Requests notification only
it extension -f-uirnd unacceptab 1 it
FAY. C H HiEIonsin Electric Power Co 9D/07/03 lp
&00724G012 Forwards IE Insp Rept 50-3O1/80-09 on SOO327-51? No
none o nip 1 lance no tod
HEIBHMMJ, R F Region 3* Chicago, Reactor Op era t i onil Nuclear Support
Branch BO/Ofi/Oii 2pp
BOO715Q6B3 Submits rumments nil NUREG-Qfi54 Tun objectionable llama 19
minute tune frame- proposed to complete public Tic-t( Ficat inn
& proprlBty (if mm shift 5t.aF-fing requirements proposed in
Table D- 1
FAY.C W Wistnnsin Elivctrn Pouier Co 8O/O7/03 6pp
BOO721O03-1 Confirms Ecnjidula for BOO/OH meeting at site to diseuis
recent increase uf personnel errors at facilities
HEPPLEFJ.,1 fl Region 3, Chicago, Office of the Director 80/O7/03
3007210408 formards revised Ttch iipec 1534 For flteam 6 power
conversion sys R Fnur 73-h test repta Fo- am 1 1 iaru. feud
pump in response to NRC BOOS16 request for addl inPo re
auxiliary fsediaatar BIJD
FAY.C N Wisconain Electrit Tnuer CD BO/07/OB 4pp
— B00731013B fi&vi5«fl TerJi Spec 1 5 3 "1 for steam & power conversion ty E
» Wisconsin Electric Rawer Co EO/07/OB Ipp
— 3007210452 "Seventij-Tyo lluur T»st o* Turbine-Driven AuilUary TaeiJ
Pump "
a Wisconsin Flectrit Power Co UMTP II 21 RO 79/IE/2B lOpp
--B007H10'160 "Seventv-Tiuo Hour Test of Turbine-Driven Am) liar if Feud
pump '•
" MiscDnsin Electric Pouier Co WMTI* 11 21 RO 7^/ia^O? tOpp
— 80072'4QOIB IE Insp Rept BO-301/BO-09 on 600537-2^ No noncump 1 i anc e
noted Major areas inspected core pouer d i Btri b u ti on limits-
reactor shutdown margin dete-rminat ion fe isnthtT-mal temp
coefficient of reactivity measurement
CHDW.E T . HOPKIN9.J 0 , STREETE«,J F Region 3. Chicago* Qffica
of the Director flt>/Oi/(J& 4pp
BOQ7010041 Updates B003O7 response to IE Bulletin 7-9~14, '"Be i urn 1C
Aniilgsii For As-Built Safety-Rotated Piping SYS " piping
analysis completed Par BA af OS proviouslij tabulated
draulngsjaa of 000333 Status op review end
FAV.C U Mliconsln Electric Power Co BO/06/O9 spp
Faruarde IE Info Notice 80-36. "Evaluation of Contractor
OA Programs " No written response required
UEPPLER,JQ Region 3. Chicago, Office of the Director BO/06/1O
IP
B007160193 Forwards IE InFo Notice 00-97, "Dsgrada t i on at RBictor
Coolant Pump Studs " No specific action or I-BBPDHB.B
Tflituired
KET-PLEn,J G Flpglc-n 3, Chicago. OFfico of tlio Director BO/O6/U
B007030030 ForuiarJa IE Dul lotin BO-19. "Possible LOHE of EmBVjjBncg
Notification Sija (ENS) H/Lo&s af Dffsite Power " Written
response ronuirod
0 Rogion 3. Chicago, Office nf the Director BO/Oi/18
-~QOQ72l04fa1i "Ueventy- Two Hour Tflst of El actri caHy-Dr 1 von AuxlliflPU Fefld
Puir.p "
* WUccmsin Electric Pnuer Co WMTP H S3 HO 79/12/3a IDpp
--S007S10169 "Suvsnlij-Tua Hov-r Test o» El oc tr It a Uy-Or i ven rtuiiliarg
Feeri Pumps "
« Wiaconein Electric Pouftr Co WhlTP II 5S HO 79/13/23 lOpp
007240330 rtdvinBS of MRC i-eoraam i ation on 000-123 uihich rnaultod In
number of chaTigo? an ofc ti ties, poll Don t & asBijnmenta of
personnel AI«-D submlti infn Pnr OETR
WBVAK<T M Assistant Director for Operating Roactora BO/07/03
2pp
i00725G4RO niscu-iRea pntonllal wpldirij de f i ct enc i e& In tankv fsbricfltoj
by Graver Tani f' Mfg Co Renueats dpterfninittloil uihother
ueldmontt in sa Pety-rolatuif Oraver t.stik* meet deiign Sfiscs
t< Pabr icobian r eqvn rcmon tn
MO3EL£;V,N C 1)1 vi 5 inn of Rpactor Operations Inspections GO/ 07 /OB
Inspection reporttj It' Dulletliis tr torrD&ponilDnce
O07030037 Forwards 1C Info Notice 8Q-32, "[truflliJ
Control Programs. " No written resjionsa r*q.uired
MEPPLER.J a Region 3, Chicago. OPPicn of the Director
Jp
In Contain 1 nation
BO/05/SE)
in
IOD7310'109 Foruiand* Ii: Circular QO-1H. "tSrid Strap D
UestlngJinusa Titel AssemttlieK " No uritton roRporse raqulrad
KEfPLER.O 0 Region 3, Chicago. OFfico of the Dlrsctor 00/05/38
If
1007010080 Formai-di IE Info Notice BO-23, "Loss of fiuctlon to EmerBen
Feeiliuater Pump* " No written s-oaponsc required
KEPPLER-J Q Region 3. Chicagu> Office of the Director BO/03/39
If
OO701Q030 fiesptinds to IE Bulletin 80-Oi* "Eng I it»«r«ii Sapety TBaturs
(EfiF> n*mt Control t " Control of soJenold vulva uill oa
modifletf ioch t^Ht total reqirf ulntioii of control i-oom air
uill continue after reset of containment i so l,it tun
FAY.C H Miicnnsin Elnctru Puiutr Co BQ/OA/0& Epp
'007010042 RiPipoeiUs to JE Bulletin 00-OS. "Vacuum Condition RBiulling
in Damage to Chpmicai Val Control Sijs KVCta) Holdup TaniiB "
Mod uill be implemented ta prevent aperfltion (if holdup tank
recirculation pump u/u posittvn pi-eoium in tanl
FAY.C U WlscDn*ln ElecUit Puaer Co 80/06/06 9pp
B007<D309t<7 Foruiards IE Circular 80-15, "Loss of Reactor Coolant Pump
Cooling & Natural Circulation Cool down " No uiritten reaponaa
required
KEPPLER.J 8 Region 3, Chicago, Office of the Director. BO/Ob/SO
BB0717O331 Foruiartfs JE Circular BO-14, "Radioactive Contamination of
Plant Dortilnitral i led Water Sgs & Resultant Internal
Contamination of Personnel " No written response* T-equiTed
KEPPLER, J 3 Jloaion 3, Chicago. Office of thn Dl-roctor 8O/OA/S4
IP
Porufards IE Bulletin 80-16, "Potential M I sap p 1 i cat i on of
Roscmount Inc. Model a 1151 & I IBS Pressure Transmitters
W/Either A or T> Output Codes ln Written iBiponBO required
IE Circular B0-t(j also and No written t-BSpormn i-equifad-
KEPPLER, J 0 Reaion 3. Chicago, Offica of the Dii-»ctnr BO/OA/H7
IP
fl(}(»7ai0304 rorwards IE Insp Rents 90-366/80-11 Si 3O — 3O1/HO-U on
B0061&-17 No noncompliancv noted
FSOFiELLI, C Region 3, Chicsgor Reactor Com true t ion «c ETiginoeTing
Support Branch SO/Oii/30 Spp
B00731031A IE Insp Rofttn 5Q'3bt>JGQ-\\ t, 50-3Ol/aO-l I on BOOiti-17. Ha
noncorapl ijTjce noted Major areas inspected lice-nape actions
re IE Bulletin 79-1*
V1N, ! T . BRKrXEYjR H RegiDn 3, Chicago. Off tea of ths Director
DAN1ELSON.D H Rcirlon 3. Chicago. Reactor Construction t,
Eng irvanriii} Support Branch 80/06/30 SpP
Responds to IE Dulletin EO-OS, "Eiamina t i on of Containment
Liner Penetration Welds " All containment melds cithor have
Inak clia-ie channvl or penetration haa claEure cap or
Bipan3tan bilious welded outside containment
FAV, C M Wisconsin ElnctT-lc Pouier Co BO/O7/O3 3p p
0007320071 aubmits reply to IE Bulletin 80-10 re contamination of
nonradloactivB' tys & potential for rpleases, Comf le t ioTi of
bulletin review not anticipated until SOOB31
FAV.C M Hj^consin Electric Pouior Co BO/07/O7. 2pp
Responds to IE Bulletin 80-13 rn pouei- supplij to
notification BIJE telephones Charger supplied bg t»l»phnne
company i» connocted to saFeguarda Bus 3B42 fhonos vertfie
operatlDnnl ui/losi nf ac tn charger
FAY, C U Wisconsin Electric fouier Co SO/07/OB- 2pp
117
80073001 3D Forwards drawings & revised pump !, valve inservice insp
tasting program, replac ing 790219 program Program tt drawings
available in Central File: onlij
FAY.C W Wisconsin Electric Power CD BO/O7/2S to
Purlodic operating reports >, related correspondenc
BOO713Q61O Forwards monthly operating repts for June 19BO
FAV.C II Wisconsin Electric POUIDI CD BO/07/10 lp
— QQQ715061B Monthly operating repts For June 1980
FrtY.C W Wisconsin Electric Power Co BO/O7/OB 6pp
B fisportablo occurrences. LERa & related corresponrietici
HQ07QS03B1 Forwards LER OO-OOB/03L-0
FAY.C W Wisconsin Electric Power Co
— BOO7QB03D4 LER 00-009/03L-0 On BOOJ.09, during training ualkdown of
safeguards electrical supply cabinets, noted that tie breaker
between AQ3 d A06 safogunrds buses uias shut Probably caused
by improper electrical lineup after loss of ac teat
FAY,C W Wisconsin Electric Power Co BO/Ofa/27 3pp
a 007 11 0342 Forwards LER HO-006/QI T-0
FAY.C 1J Wisconsin Electric Power Co
H •General < orrc spand enc D
6007(10144 FOIA request For documents
clothing *• cleaning procedures for T
washing pi-nt ed itros for clothing used at futility
WAGNER, D Wagnei-i Cunningham, Vaughiin, Genders !, McLaughl in
BuVOfi/13 2pp
ility (, inFD
F clothing f.
8007230337 FQIft i-e
3IVEL.M Affili
for 1
Unfcr-t
Facility
BOO711(U3<7 D-Eapondi to FDIA Tpqucst Foi documents re facility Si Info
concerning clothing !, cleanimj RVOL i duros Foi reuse of
clothing !i washing proceilur PS, far clothing ust'd at facility
Forwards documnnta listed in App, A w/o ends
FELTOM.J M Division of HuleE and RL-cords BO/07/OB 2pp
B0071H009B Partial n-spunse tn F01A request For threi- cabeoorles oP
documents re Pacilitij Response to I tern 11 may bo found in
util sumiannual repts in local J>DR Furuarda NU[i£0-oa94 ti
draft pBTsonnel cipo^ure >ch.art Chart onlij entl
FELTON.O M Division oF Rules and RecDrQs BO/07/19 2pj>
BOO7S3033B Adril rcspon^P to FQIA t-equest For three eategnries oP
documents ra fac i 1 1 tij Infu sought in Hum 12 of request con
bo found in I.ER identiftDd »n »Hc QOOi) 1 response to Items
ia-as
FELTQN.J M DivlMoTi of Rules and RPCDI ds BO/07/16 lp
— SOO711034V LER BO-OOfa/GlT-D On Q00617. durinq aaPeguar«E logic test a/
one emnrgency diuse) generator out aF svc,auto containment
•upray pump actuation threatoned during loss oF ac tt higli-
high containment pros Euro Caused by personnel error
FAY.C W Wisconsin Electric Power Co FJO/06/30 3pp
BOO7H0353 Forwards UER BO-007/01T-0
FAY.C II Wisconsin Electric Pnwer Co
J Insurance !< Indemnity In For (nation
B007310<13=. Foruards eiecuted Sudorsemfnt 31 to MAELU Policy MF-?I
FIELDER, J Harsh !. rltLBiindn. Inc. , H I, M Nut Her ConaultdntE, Inc
Div 00/O7/14 3pp
P Operating license stage documDnts !i curretpondenco
— 6007110337 LER QO-007/01T-O on B00619. at full power. test IT-04 waa
perForRied ui/ emergency, dlessl generator 3D out oF svc
Emergency safeguards train equipment would have bean
inoperable on loan of ac power Caused by personnel error
FAY.C W Wisconsin Elactric Power Co BO/07/03 3pp
Operator Eliminations
800 724 0089 Respondi to BOO&04 request For info re requirement that
operator & senior operator lirensp applicants spend 3 months
nn-ihift in training Variance to requirement cannot bo
pe-rmitted
NOVAK, T H Assiotnnt Director for Operating Reactors 80/07/OB
DOCKET SO-303 CRVBTftU RIVER NUCLEAR PLANT, UNIT 3
F Security, medical, emergency (, fire protection plans
BOO7OE0467 Foruardft site emergency plan review & list of deflciBnclae
per NUREO-O654 NRC site emergency plan review Indicate* that
addl info b commitments! are required to meet evaluation
criteria stated in NUREQ-0694
NOVAK.T M Asaislant Director for Operating Reactors 80/06/24
lOpp
EO070B0359 Forward* addl info re safeguards contingency plan in
PB«ponBfl to NHC 000333 Itr Plan withheld trnf 10Crfi2 790)
DRIGHT, R M Florida Power Corp GO/07/O1 Spp
BO07B30184 Requests participation in study of people-related probloms
tn nuclear safeguards Study involves collection of data on
licensee security forces ti practices NRC uiishos to interview
aacuriti) mat personnel at futility
E1BENHUT.D 0 Division of Licensing QO/07/11 2pp
QO07ZB0373 Updates status of fire protection mods Identified in 790737
(efety evaluation Requests expeditious review of previously
submitted items In Table 3
BAYNftRD. P Y Florida Power Corp 00/07/33 fipp
Adjudicator!) correspondenc B
6006340237 Fit spend a to technical atststflncu i oquost for proposed Tech
Spec cJiang*b for QftM operating plants FoiwardB requircmontB
for addl infa
IEnAEL.3 L 7Ml-d Bulletins '< Orders 79/OB/27 13pp
GOQ724020fl Forwards DAW licenBecE' roaponseE tn 790907 request for
rfivieu of schedule* for installing snFety grade ant it ipatory
reactor trip to? In is of f pediiis ter !< turbine trip Revi-ouj
should be completed by 791115
CAPRA, R A TM1-3 Bulletins fc Ordprs 79/10/34 lp
8005270617 Forwards NJREO-Of.-15. Vo 1 5 1-2, "Ropt oP Dulletlns I. Orders
Task Force" d NUREfl-OiSt. "•OeDerir Evaluation of Feeduater
Transinlit« tt Email BreaV LDCrta in GE~Designed Operating
Plants t. Near Terra OL Applicationa " U/o end
REID, R W Operating Heactors ifranch 4 BO/05/13 2pp
8007100207 Advisee of concurrence uj/DFc of Policy Evaluation
c one 1 ua i DI s re Impact of NI1C pust THI-2 requirements For DfcW
reacturs *• Facility tiranainnt FOPUHTI|B recommendations t
commBnts
DEHTOH. H R OPflce nf Nut 1 ear Reactor Regulatinn, Oiroctor
4pp
— BO0710O211 HciiUESta cuirinontn rin Oft of Policy tvaliration paper on
Imp-act oF NRC post 7MI-2 requtriimDntE on B^W maetors tt
facility transient Requesbs ^tibmittat by BOQ31 5. u/inclui inn
of Program CIPc vt BUIB
AHGARNE. J F Commi salon 00/04/29 lp
BOOTH 300 >? 9 Requests aubmlttal of proposed (ech Spec changes providi
for redundancy in rtecaa hent n-movfll capability in all modes
of operation Model Tucli EPBCB uhich wault priwida acccptablp
ceaolutlon encl Fur -guidance
EISENHUT.D 0 Dlviilon of Licensing GO/06/ 11 62pp
QOO7IOO111 Forwards Amend 31 to Licanse DPR-7E. safety nvaluat 1 on i
notice of issuance t> availability
REID, R U Qparatina Reactors Qranch 4 00/06/18 Spp
— B0071Q01IB Amend 31 to UicEfise DPR-72, del utini] rEnuirements for
maintBlnlng contfl 1 nment test prwBEUiB utter* inspecting tandem
end anchorages
RFID. R W Operating Reactors Branch 4 SO/Ofe/19 5pp
BO07310243 Forwards Commission B00327 memortindum t< order containing
decisionB on UCS 700303 petition for reconsideration of
7B0413 memorandum tt order UCS 771104 petition sought action
re fire protection for electrical cables
eiSENHUT.D G Division of Lirensinfl 80/06/S5 B9pp
-80Q710Q11S Safety evalitatiat' suppoi ting Amend TI to License DPH-72
* Office of Nuclear Reactor Regulation, Director 80/06/IB Spp
-800710O121 Notice of Issuance !< availability of Amend 31 to License
DPR-73
RE1D.F1 U Qperatirao ResttOrH Branch 4 QO/Qh/lO ^pp
118
DOCKETED ITEMS
B007O3Q242 Responds to MIC D00303 request For mfo re presaurlie
saFetij values Includes data taliflii during BOOS2& incident to
assist in determining flow rates ft conditioners in HCV-B
relief train Teal reiults UIL 1 1 be sent uhan available
BRIGHT, R M Florida Power Corp aO/Oi/25 175pp
B0071S039-1 Advises tJiat restart ui/u conpletion oP Item !H Is
just I Fled. as original FBAR is atlll valid For present
design All items mill be completed prior to Mode 3
operation Affidavit end
V Florida Pouor Corp BO/07/16 4pp
SOQ7QiO:i35 Application For floipnd to Licnesp DPR-73, granting waiver from
certain AIME Section XI testing I, insp requirements
Certificate of Sue end
EFIIGHT.R M Florida POIUBT Corp 30/06/26 -)pp
BG070203B7 Application for amend to License DPR-70. revising operator
retraining requirement & Includes 1-wk simulator trainin-g
tcurso each yr J; ^ riayt- shift uor> per "l-mnnth interval for
backup licensee's nut iit Unit 3 Certificate of Bvc enc3
BAYMABD.P V Florida Power Corp 90/06/27 Ipp
£3007-07031:3 InPnrms tn.it, due to relationship of tests to Crystal River 3
event & IE Qullfltin 79-27 response, tests verifying effect!
o* c. ombinati tin of pouor los-6 an itiEtrumnnti tt contrpl
functions ul 1 1 be provided by BQD'73<>
HERDEIN, J ft ML>tropQl itflti Edlion Co S0/0(j/30 lp
B0071BQ313 Submits addl info re imp lamentation of short-tarm lasi
learned ranuiTflrnonls. to supplement BQ04I1 Itr Contract
consultants uill B-SSHSH operatinq elporlence from 000101
until technical advisors hit-ad Certificate of OVL oncl
BAYNADD.P Y Florida Power Corp 60/07/16 3pp
BOQ71BO3afl Responds to Recommendation 22 of NUHEG-0667, reqila »tlnj
analysis oF LEfls attributed to licensed personnel error
Tabular t, graphic response prepared by Inst of Nuclear
Power Operations en-el
i P Y Florida Power Corp 8O/07/16 2t.pp
(300732O3S3 Responds to NRC BOOS02 request for info vc prBB«orlier
aafetij valves ForiuardH Oilbart Assnt iates. Inc B00630
"AnaltfBiB of 800336 Pressur 1 ler Transient Relief Valvo
DisicSarBH " Support ing 1 trs oncl
V Florida POUIHT Corp 8O/O7/17 9pp
B0072JO004 Foruards nueBtinns re fuel assGoblu. holddniun spring inspi
saF-etu signi f icflnce of operating ui/brahen iprlngs in carm
Rcqueite respDnii* uithin 60 days
NDVAK.T H Asaistant Dlrectoi- for Operating Reactor* 60/07/01
4pp
— B00722O3S5 "Analysis of 300236 Preotujriier Transient lleLiiP U*l
Discharge "
AHAUZ.Q A . BUNKER, P L Oi Ibert/CammonuiBOlth Cos BO/06/30
ISff
E0072JOIIO ffequegti response to end questions re fuel asseublij
ftoldniiit) springs Several haldnun sprino failurfft have
recently oicurred at Davi s-Dei se, Uni t 1 NHC uiiliea to obtain
result* of hoIODiiii spring insps at other Fatllltins
NOvAK,T M Assistant Director foy Operating Reactors 80/O7/OI
8-007310531 FoTU-ards ^UPEtionE. re Fuel as&einblij holddoiJli spring Failure
NRC Is intBTBitcrf in knowing r«eults of spring insps !i
oafotij nan i fi rant c of operating in/broken springs in core
Response requested mithln 60 days of Itr receipt
NOvrtK. T M Assistant Director fnr Operatlnfl Reactors OO/07/01
3pp
6007230001 Requests aubmitti) of application for am&nd to licence
consiating oF Tech Spec changes fr Itcense ccnJltions PHH
Jlodel Toth Specs t> Hodel license conditions For TMI-2
L(js*aii3 Learn i> it Category A items encl For guidance
EI5ENHUT,D 0 Diviaion of Licensing 80/07/03 A9PP
B0070B007S NoHFies that evaluation of B(HJ-lfa31.Te ovei-all asymmetric
L-QC ft loads., will be submitted dy G0030S
JUJOBErO C Florida Pmuor Corp 60/07/03 3pp
0007390378 SaFeti) evaluation of corrattive oction follouing 800S2ii
incident Actioni taken are sufficient to permit restart
• Operating Reactors Branch d 80/O7/1B Bpp
80073^0074 Forwards scdedule for commi tmcnta to THI-2 related
requirements, per NRC 900507 request Affidavit end
HflYN*Hn,p v Florida Power Corp (3O/O7/21 4pp
B0072BD326 Revision to Tech Spec Change Request 61 correcting
simplifying aasuniption made by DbU in reanalynis of Cycle 3
that allouet! utilliation of flui/flou ratio of rounded-off
1 09 Certificate af Svc t, affidavit enc 1
BflVHflRD, P Y Florida Fouier Corp 0O/07/32 3pp
--B007250330 Proposffd revisions to Tech Specs, Pages 2-3. -5, -7, D 2-9 tc
B E-A, c hang Ing Flui/Flou ratio
» Florida PouiBr Corn BO/07/S3 5pp
BO07an0137 Application to amend License DPR-73, del etlng power l»vel
cutoff TBiuirement of Tech Spec 3/1 1 3 9, "Reactivity "
AFFidavlt. Certificate op Bvc tc Tech Spec Change Request tb
encl
BftYNflFtD.P Y Florida Pouier Corp BO/O7/H3 4pp
(300713048-1 H-equcsts ejtension oP comment period r* WRC S00919 lit
f oruard ing MUREO-OS77 Par revlcu F^tilitij In eitffnded -outage
implementing TMI corami tments Ritensian until BOO? I 3 Mill
permit Adequate analysis oP iasue
HOORE.O C Florida Pouar Corp 60/07/03 lp
— 8007200133 Tech Bp BC Change .Request bit For amend to Licenso DPR-7Si
deleting payer level cutoff requirement embodied in Tach
Spec 3/4 1 3 B- "Hoactivity "
* Florida Pomer Corp BO/07/23 6pp
B00710DI93 Clanfie-3 utll S002I3 Itr re compliance u/Categora A
requlrementB of NUIJCG-OUTB Bllver isollt* cartrldoea uill be
Died tn collect i ample 8 under accident condition* Single
channel analyzer utll bo utillied
*1 Florida Power Coi-p BO/07/07 Sff
B00711Q132 Notifies that l»6tcri guidel ines Ic chanaes. subni tted for NflC
infa b revleu on F1OOS23 were used to revise Emerssncy
Proceduma lOlr 101-106. 109 fc 113
BAYMA'JD.P V Florida Power Corp 80/07/OQ Opp
0007840037 Notification of 000711 meeting u/util in DechBida. PID to
dlscuia status of 51 lorrective actlpni folloulng 800326
Incident
F/lIflTILE.M D Dpoi-atinB ReactnrB Branch 4 ao/Q7/O<? Bpp
a007E50a?B rrovldes info ra neu &fc t i t IBBI p-osi tions J- assignments nf
perioinel resultirg from 900-128 reorflanliat Ion o* Qfc of
Nuclear Reactor flegulat ion
NOVAK. T M AstiUtanB Director for fip&ratins Reactors BO/O7/1O
O07150naS Forwards addl into re containmont purge & vent siji. per
00022? request Response prepaTci! by B-tcW answers QuHations Ic
i It Response to (iuestlon* la. Jh. Id * If uere cubmi ttefl on
800iE& Affidavit; erut
MODHE.fl C Florida Pooler Corf 80/07/11 Iff
Q Inspection roporti, IE Bulletins t> rorrespondence
HOD734020E Forwards IE Info Notice BO -SO, "Loss of Decay Meat Removal
Capability at Davls-Busse Unit 1 While in Rafueling Mod* "
No response required
O'HEILLY, J P ReDion 2, Atlanta, OfPice of the Director 30/05/08
lp
QO0702QI71? Forward! IE Info Notice BO-S3, "Breakdowns In Contamination
Control Programs." Nu luritten response required
O'REILLY. J P Region 2, Atlanta, Office of the Director BO/OS/SB
BOD7P.10462 Foruardi IE Circular 80-13, "Grid Strap Damage in
Meitlnghouse Fuel Assemblies " No uritten response required
O'REILLY.JP Region 2. Atlanta. Office of the Director
Q0070102S1 Forwards IE Info Notice 80-33. "Loss of Suction to Emergenc
Feeduatrr Pumps " No ti>ritteei response required
Q'SEILLY.J P Rc-gioo E. Atlanta, Office of the Director 80/05/29
90072S007A Forwards TE InPo Notice BO-26, "Evaluation of Controctor
QA PragrsJns " Nn iijritton response required
O'REIULV-J P Rejion 2- Atlanta, OfPice of the Dirtctor BO/06/10
Notifies NRC tti«t ronta imnent iBolation vaive.CAV-1 Is
Functional effsctiv* B007ia Past provisions of Tech Spec
304 are app) i cable
HAVN/ifiD.P Y Florida Power Corj BO/07/15 2pp
119
BQO71iQ362 Forwards JC Info Notice 80-37, "Degradntion pf Reactor
Coolant Pump Studs " Ho specific action or response
re-Haired
O'REILLY. J P Region S, Atlanta. Office of the Director BO/06/11
IP
R Periodic opuratiiig reports f. related correspondence
BOO715070B Forwards monthly operalmg rept for June 1 190
BAYNARD.P V Florida Paiuur Corp BOy07/(J? Ip
00070S07'I3 Fnrwardii 1C Bulletin 00-15, "Possible Loss of Emergency
Notification Sys (EN3) H/Loss of Offsite Pouor " Written
response required
O'REILLY.J P Region a. Atlanta- Office of tho Director BQ/06/ia
lp
— 9007150713 Monthly operating i-cpt For Juno 1980
CULVER, M H Florida Pnuiei turn BO/O7/01 Jpp
3 Rnporta&li
6007030409 Forwards IE Circular BQ-15, "Lots of ReactDr Coolant Pump
Coaling (• Natural Circulation Looldown " No written response
required
O'REILLV.J P Region 2, Atlanta. Office of the Director 8O/Ofa/SO
BOO7O10'lt3 Advises that BQO530 pflrt SI i-ppt re, mainstr
cracking in valve diSL guides has. btpn d i&posi t lonod
Forwards analyse! dotermining paitb acceptable fur u
HANCORH..J A Flni-ida Puuer Corp BQ/Qb/Z4 17pp
safety valve
BOO7It0794 Forwards IE Circular 80-14. "Radioactive Contamination of
Plant Demineralijed Water SIJB t< Resultant Internal
Contamination of Personnel " No written response required
O'REILLY. J P Region 3, Atlanta. Office of tho Director BQ/Ofa/S4
8007190495 Ack recBipt of BOOill Itr informing NRC op steps talien to
correct violations noted in IE Insp Rept 50-303/80-19
LEW IS, R C Region 2. Atlanta. Reactor Operations Nuclear Support
Branch 80/04/29 IP
— BOO7150303 Responds to NRC 000515 Itr re violations noted in 1C Inap
Rept 30-302/BQ-19 Corrective actions meetings recorded
on microfilm, n«u> drawings ordered & vendor manuals
maintained & controlled
HANCOCK. J A Florida Power Corp BO/Oi/ 1 1 3pp
— S0071B03QS. Forwards IE Insp Kept 30-302/BO-19 on BQD431-29 fe notice of
Violation
LEWIS. R,C Region Z, Atlanta. Reactor Operations Nuclear Support
Branch BO/05/13 3pp
— BOO7130310 Notice of violation from inap on S00421-35
» Region 2. Atlanta. Office of the Director 80/05/14 Hpp
E0071104O2 For
HANCDCH. J A
arHs LER 00-025/03L-0
Florida F'oiuor Ci.Y-p fiO/07/07
— SOO7I1O41O LCrl BO-Q33/03L-0 on BOO6O9, uihi le performing SP-113 calibr
of reactor prutection ags, count rale amplifier for channel A
source range neutron flui monitor Found out-of-tul erance
Caused bij deFpctivc pulae ti output amplifier cards
LANCASTEft.K F Florido Poucr Corp 80/O7/03 &pp
BOO7290B71 Forwards safety evaluation re 000236 incident Corrective
actions taken are sufficient to permit restart Ei to ensure
saFe operation
RE1D.H M Operating Reactors Drone li 4 BO/07/ !B £pp
DOCKET gO-3O4 Z1DN NUCLEAR POWER STATION, UNIT S
F SetUTity. medical, -eniBrgoncy t. fire protection plans
BO07O10347 Forwards safeguard! contl nguncy plan ampiid Plan withheld
tref 10CFR3 71O>
PEOPLES, D L Commonweal th Fdlson CD BO/Ofi/37 lp
0 Ad jud i calory i or respond onto
— aoo71SOSH IE Inap nept SO-302/80-lv on BOOfl31-23 Noncompliance noted
failure to provide adeiiuate document control program for
vendor manuals
PRICEiD S Region 2, Atlanta, Office of the Director
UPRIGHT, C M Region S. Atlanta. Rene tor Construction {. Engineering
Support Branch, 80/05/14 7pp
BO071B0940 Forwards response to IE Dullotin 00-10 Program to prevent
unnonitorBdij uncontrol led liquid !< gacBouB releases to
• nvtron described Operation of etjs as radioactive sya is
acceptable Provisions made to monitor b control relttaial
BRIOHT.R M Florida Power Corp BO/06/23 4pp
0007310243 Forwards Commission FI00537 memorandum !i order containinfl
decisioriB on UCB 7BOS03 petition for recons iilerati on of
76O413 memorandum & order UCB /711Ofl petition sought action
re firo protection For e<leclncal cables
EISENHUT, I) G IJlvi&lon of LiLenslng BO/06/29 89pp
B007O20&46 Memorandum specifying isnuos to be discussed at B 00701
oral argtimont. re Btato of II contention that applicant
commitments shoiilil tic integiated in license Tech Spues, in
storage pool mad proceeding
TOMPKINS. D A Atomir Sofetij and Licensing Appeal Panel QQ/Ofo/H6
2pp
9007330210 Forwards IE Bulletin 80-16, "Potential Misapplication of
Ronmount Inc Models 1151 & 1132 Pressure Transmitters
H/Elther A or D Output Codes " Written responae required
IE Circular BO-1* also end No written response required
C'REILLV.J P, n.gion 2, Atlanta, Office op the Director 90/06/97
IP
BOO7100O2S Forwards "Tech Speca for Huclpar Power llBnetors, " 10CFR50
advance notice of rulcmaking, for uhtrh counsels' attention
is invited by ABLE) Comments mny he submitted to Commlasion
r-o BOO7O1 oral aroumoit
QIBHOP.C J Atiimic Safety and Licencing Appeal Panel BO/07/03
IP
B007E403B2 Foruards meeting minutes in response to IE Insp Rept
S-0-302/BO-19 Records nou incorporated into plant quality
files
PDOLE.D C Florida Power Corp BO/O6/37 lp
BOO7070329 Forwards rept responding tu IE Bulletin 79-Q1B, "Environ
Qualification oF Class IE Equipment " Outstanding items
i.n Sictions 2 d 3 will be further evaluated as info becomes
available U/o end,
BRIGHT. R H Florida Power Corp flO/06/30 lp
BOO715059B Forwards response to IE Bulletin 00-11. "Masonry Wall
Design " Licensee uiil] develop rn-svaluati on acceptance
Criteria for uolls based on conBorvativa design assumptions
consistent u/srhodule in Item 2a
BHIOHT, R M Florido Power Corp 80/07/07 6pp
8007230 9 6R Forwards response to open items of IE Bulletins 79-02
re pipe support base plate designs I, 79-14 re seismic
analysis of safety-related pipina ays identified in IE
Insp Ropt 50-302/60-02
BAVNARD. P Y Florida Power Corp HO/07/li 7pp
— B007H30373 "Earthquake Intensity for Piping Analysis & Pipe Support
Design " FBAtt eicerpt one}
FERfiAREI-LO, 8 Florida Powar Corp 79/10/11 -7pp
— H007100036 "Tech SpueD for Nuclear I'oiuor Reactors," 10CFF130 advance
notice of ml-Dmali Ing Establishes, std For deciding which
items Prom 8AFI must be incorporated into Tcth SfecB ('
modlfios deriitltions of spec categories
CHIt-K.S J OfPJte of tho Berrptary of tho Commission BO/06/30
B00730036a Updates tertnin projected load d capacity estimates which
appear in record of proceeding per applicant obligation to
k«ep A8LAD appraised Of developmcnta RelatBi correspondence
STEPTDC, P P I shorn, Lincoln t, Qealo 00/O7/OQ Bff
H General correspondence1
0007110133 WespontlB to B002B9 rrnuett to reject util license to
increase storaau ciipaclty of facility spent fuel jiool
Actions Initiated 771010 to assure tliat emergency plans are
imple^men ted at all licensed operating reactor sites
DEMTON.H R OPfirii of Nuelcnr Reactor Reg ijlntinn. Director
SO/09/O6 Sfft
800721020B Renpontls to pncl HOOfllB Itr to Pi-eaidont Cnrtnr re Indian
Point Facility Describes NI1C. efforts to protect nihlic
health at fatilltie-s luriently npernting or planned for
operatlPit Village Voue niiws jrticlp oncl
DENTONi H R CH"firi» up Nuclear fU'actnr [iegulatlon, Director
BO/05/B1 lOpp
120
DOCKETED ITEMS
B00731O3EO Desponds to eficl BQO4O1 telegram to President -Carter urging
closing of Facility !i all nuclear plants near populated
areas NRC 90022^ c anf ir<ratorv order required immediate
short-term actions to aseurp public safety
EISEMHUT.D G Division oF Licensing BO/07/17 3[>p
8007330646 Summary of 000907-08 technology exchange meetinns u/utl]»
in Chicago, IL re core melt accident sequences t, associated
phenomenology for facilities NRC perceives real urgency to
for answers to key technical questions
MEYEB.JF Reactor Systems Dranch BQ/O//09 12pp
ittee on Reactor Safeguards report? 6 correspondence
BOO7S3030B Providps summary of 900507-QB neeting u/utils re rare melt
accident sequences Utils appear to eipect NRC to resolve
problems t, do nothing to nitlgste c onEequences of Class 9
accidents
CATTCN, I California, Uni\ of. L&s Angeies BG/05/1O 6pp
Q007aBt»iOS Notifies that PO Btoddart, primary NRC reviewer for Zion, hat
requested addl info to complete reviBU,as result of
diseu-ssions re MUBEG-OS7B Item S 1 Bil on improved pn»t-
aceident sampling capability Lists drawings sent
NAUGHTDN.WF Commonweal th Edison CD BO/O7/31 2pp
0 Inspection reports, IE Bulletins & correspondent!
P Operating liLense stajp dot uments fi correspondence
BOO*24Q<1E(} Forward* addl info re review of unresolved safety issues,
trip rept Of Lessons Learned imp iBmentation team, t: task
action plan in v i uui of high population density surrounding
P lants
BEHTONiH R Office of Hue 1 ear Reactor- Regulation, Director.
BO/04/09 33pp
8007230099 Requests iubmlttal of proposed Tech Spec changes providing
for redundancy in decay heat remnvs! capability in all modes
of operation Model Tecfi Specs tihich uould provide acceptable
resolution end for guidance
E15ENHLJT.D Q Division of Licensing BQ/Ot/11 A3po
6007020043 Forwards IE Info Notice 30-22, "BrBakd Duma In Contamination
Control Programs " No written response required
KEPPLEfl.J Q Region 3, Chicago, Office of tlie Director 80/03/30
Ip >
B0073IO336 Foruiards IE Circular BO-13, "Grid Btrap DatnfQt! in
UBstinghouse Fuel rtssemblies " No Britten roBponso i-Bn.u*r«d
KEPPLEn.J 0 Region 3, Chicago. Office of the Director 80/09/8(1
IP
B00701OOBi Forwards IE Info Notice 8O-S3, "Lo«s of Suction to EmerjuriCY
Feeduater Pumps " Ho written rosponEB requirod
KEPPLER.J 0 Region 3, Chicago, Office of the Director 00/05/89
Ip
00O7100393 Summary of H005aO Teefinology Eichange Meetmj 3 m/utilB in
8ethesda,MD to discuss accid'ent mitigation features for
power plants
LQNQ.J V. Division oF Sgstema Intsoration BO/06/12 7Spp
BOO-7010110 Wotiflcation of 300425 meeting u/util* t. Saudi a Laba in
netfiB5<faj MD for p,r esentation of overvicuj of facilities risk
study Agenda eric 1
IBHAO-.S L Beliabilitg t* fliofc Assessment Hranth 8O/Oi/lfi 3pp
B00711O557 Summary ttf £100530
action plan
OLSHflN, L W Operating Reactors Branch 1
eting w/util in Dethesda.HD ra statui of
80/O&/33 3pp
BOO7O1042B Foruards Drawing SaE-l-ISSO re reactor, turb ina t generator
trip protet tion. in response to HOQ6I9 discussion c-oncerning
automatic initiation of auiillary FecdLrater «i|s Draining
available in Centra] Files only
NAUGHTON.H F Coramonuealth Edison Co BO/06/34 Ip
80O701O3I1 Foruards response to BOO239 confirmatory order requiring
review of leu plant sys vulnprab i 1 i ta areaSi possible
operator dependent areas tt control room emergency
procBduras
NAUQH70H, W F Carnmonuealth EdiBon Co GO/06/26 49pp
8C070IO6GS notification oF BOOA17 meetlnj cj/utils in Oethe Bda, MD to
discuss containment structural response, fa i lure pr-emmures 6
failure modee for facilities H5 described in NRC aoO-110 1 tr
to Count Ed
M£YEH,J F Reactor Systems Branch BQfObJSi, Spp
S007O701S4 Su-bmits reviaed responses to NRC 7706O3 Itre re second
level of undarvol tage prDtectiurt for 4 IV emergency poiuer
buses supplying safety-related loads
JANECEK.R F Canmonuea 1 th Edison Cn S0/06/2i 4pp
8OO7J7O24I Forwards request fop add! info re baclrFittino df severe
accident mi tiffatinn Features. Response recjiiestpd within 30
days
NOVAK, T H flcsistatit Director for Operatlnj Reactors BO/07/02
?pp
a007H50O[>l Requests subroittiiJ oF application for anend to license
consisting of Tech Spec changes !< license tunditions PWH
Model Tech Specs *i Model licence conditions for THI-3
Lessons Learned Cat-egoriji A items, enc 1 For guidance
E1SENHUT, D G Division oF Licensing SO/07/02 69pp_
B00713047A Submits addl info re lOCFRSO.flpp J, exemption Mod to install
floumeter u/high floti alarm on pancttrBtion pressuri latlon
piping to personnel air lock tloor seal«i completed Includes
marked E*t OF drawings H/o dramings
NAUOHTDN. U F Comjnonureo 1 th Edison To BO/D7/O7 4pp
B00717059B Bummary of 300625 mefetmc; u/P i c kard. Loye Si Gai-ric I, Int r-e
ris* study including morleliiig for (.lump trajectory
containiBent event tree I, model ing, use of plant datd 6
cunsiilEratiDn of eiterrial events
ISRAEL, S L ffeliiifii 1 1 ty I. Pink £s sassrrujnt Qrancli BO/07/D7 Bpp
BD070SOD50 FeruartfB response to IE Bulletin SO-OS, "Vacuoffl Condition
Resulting in Damage to Chemical Vol Control Btja (CvCS)
Holdup Tanks " Three Zion holdup tank* can tie valvod to
contain primary ays water Positive pressure is maintained
PEOPLES.D L CnmrnonuDflltn Edison Co 80/06/04 3pp
B007220] 56 Forwards IE Info Notice BO-26, "EvaluBtion of Contractor
QA Programs " No uritten response required
KEPPLERrJ 0 Region 3, Chicago, Office of the Director BO/06/10
Ip
BOQ702QI?9 Foruards IE Insp Repts 50-293/80-09 t. 50-301/80-09 on
600312-13 fc 19-20 (c notice of violation Notice of violation
uithneli! (ref 10CFR2 790)
MIND, J A Region 3, Chicago, Safeguards Branch 80/06/11 Spp
-- B0070aOail IE Insp Rept9 SO-S95/BO-09 (. 50-304/BO-09 on B0081B-13 fc
19-20 NoncompUance noted failure to conduct proper-
personnel screening to secure * attend doors of vital
areas !. to test alarm BIJS Details withhold (re* 10CFF12 790)
HADEDA.T J , CHRI9TOFFER. 0 Rogioii 3, Chicago, OffiCB of thii
Director HIND, J A Reflion 3. Chicago. Safeguards Branch
3pp
BOO71601&S Foruarfls IE Info Notice 80-27, "Degradation of fioactor
Coolant Pump Studs " No specific action or response
required
KEPPLERrJ 0 Region 3, Chicago, Office of the Director BO/06/ il
IP
H007020O7A Forwards response to IE Bulletin BO-IS, "Decay Hiat Removal
SKS Operability " Revieui of ftHn deoradation events found
none similar to Davis-Cease incident
DELQEOfiflE.L 0 Comraotiuiaa 1 th Edison Co 80/06/16 3pp
8007100004 Forwards response to IE Bulletin 80-09, "Hydramotor Actuator
Deficiencies." No saf etg-related ays or component at
Dresdon 2 t 3 uses AH-90 or NH-90 series hydramotor
actuators
PEDPLE3.D L Commonwealth Edison Co BO/Ofi/16 3pp
B007030037 Forwards IE Bulletin BO-13. "Possible Loss of EmernBiicy
Notification Sys (ENS) W/Loss of Dffsite Pouier " Written
response required
KEPPLER, J Q Region 3, Chicago, Office of the Director BO/Ofi/lB
IP
B007230365 Foriuardo IE Insp Rept 50-304/80-07 on 800429-30, 0319-ai ti
06Q3-04 No noncompl lance noted
FIORELLI.O Region 3. Chicago, Realtor Construction t. Cnginstrinn
Support Branch BO/06/19 Spp
— B007B30375 IE Insp Rept 50-304/80-07 on 8004B9-30, OSI9-H1 b 0403-04 HO
noncompliance noted Major areas inspected revieui of
insorvice inep program t. obsorvation of examination
activities & results
KEY, H J Hefllon 3, Chicago, Office of tho Director
QANIELBON,D H ReBion 3, Chicago, Reactor Construction (.
Engineering Support Branch SO/06/1B 7PP
DOCKETED ITEMS
121
HO070BO909 Forwards IE Circular BO-13. "Loss of Reactor Coolant Pump
Cooling d Natural Circulation CooldouJn " No written response
required
KEPPLER,J Q Region 3, Chicago. Office of the Director BO/06/EO
BOD725O&3B Forwards rifspcr.su Lu !E Bulletin 80-00. 'Etami nat i on of
C-onta i nms>n t Liner Penc t rat inn UuliJE " DrtsdEii Unit 1 designs
uii 1 1 bo reviewed !c feasibility of pprFiirming radiograph ic
cxaniiTiEitian& uj i ) 1 he- a5r>p5£pd tieforp tmi t returned to 5VC
PEOPLCS, D 1. Commonwealth Edison Co QO/O7/O? 7pp
BO07B307S4 Forwards IE Insp Hepts SO-395/BO-Oa fc 50-304/BQ-OB on
BO0421,0315-2O, 3O fc 31 No noncomp 1 iance noted
FIDRELLliO Region 3. Chicago, Rear tor Construction & Eng insuring
Support Branch 30/06/33 2pp
— 3007230739 IE In»p Repta 50-295/BQ-OB k 30-304/80-08 on B00421, OS15-SO.
3D ti 31 No nnncomp 1 iance noted Major areas inspected Dci-gen-
Paterson large bore hydraulic snubbers an Unit H steiim
B«n»ratar«
DAMIELSON.D H Region 3, Chicago, Reactor Construction B.
Engineering" Support Branch VIM. I T Region 3, Chicago^ Office of
the Director 8Q/06/1B 3pp
R Periodic opernitiTiiQ i t>p art ** !i related correspondents
80Q714O3-27 Forwards monthly operating repts For June 19BO
GfiAEESEFl.K. L LammonuBal th Edison Co BO/0//O7 In
--BOQ7140331 Monthly operating repCs for June I960
COOK.J H Comrooniuenl th Edi5on Co BO/0//07 llpp
Reportab 1 e otc nrn'rices. LEF15 5- rel.-ited c orrc sponilerici
D007170430 Foruarda IE Circular BO-lfl, "nadioactivE Cuntamlnati o
Plant DemlnBralind Mater Sijs & Resultant Internal
Contamination of Personnel " No uirilten response required
KEPPLER.J 0 Region 3, Chicago. Office of the Director
e007S30a4B Foruards IE Inap Ilopts SO-29S/BO-11 d 50-a04/BO-ll on
800327-39 fc notice of violation
DAVia.A D Region 3- Chicago. Fuel Facility. & Materials Safety
Branch BQ/OA/34 Spp
-B007230373 NdtUu of violation fron insp on S00327-29
t Region 3, Chicagoi Office of the Director OQ/Ofe/20
Ip
-00O7330276 IE Insp Repts 50-293/00-11 t, 30-304/BO-l 1 on BOD527-2?
Noncomplianc* noted excess pH nf iuast« tuater releaSBd t*
failure to standardise sodium hydroiids solutdo-n durinj
boric acid titratlon
E8S10.T H , OEBTMANNitl J , RPVTEK, C Region 3, Chicago, OPfite of
th» Director BO/Oi/EO 9pp
B0072S03D7 Foruards LEU BQ-OO9/O3L-O
WANDKE.N E CornfronwDfl 1 th Ellison Cc. QO/03/03 Ip
LEH DO-OO9/O3L-O on 8UO20a, Btcam genEratur level transmitter
2LT-530 had shifter! high lij a a1)'/ Caused bg trsnemittar
drift due to natural component aging Transmitter
retfllibT Ei thjnntl rcturiiL'd to svt
JENM.1NS.R V Commonujealtli Edison Co BQ/03/03 Ip
BOO7160Afifl Forwards LER HO-022/O 1T-O
MANDKE.N £ Commonuiea 1 th Edison Co SO/06/37
- BO07160672 LG(1 SO-Oaa/OlT-O on (500613, during integrated leak rate lest
an Unit 2. accgmulalorb for poupr nperatDil rt'Liof valvBB
vented t< jnatruinent air i^oSatpd Ciiuied by air liol.ition
Procedure change to bliitk vslves up en during tast made
Grt,HC,2 Comraonvie-ilth Ellison Co OO/QA/37 3pp
B0072EG3B7 Forwards LER ITO-
ORAESSER.K L roiraionuealth Edieon Co BO/07/16 Ip
8CXJ723O2B9 ForwarJB IE Bulletin CO-16. "Potential Miaapp 1 1 cation of
Rosemount Inc Models 1151 & 11S2 Pressure Trnnsni tters
H/EitKer A or D Output CodeB " Written response required
IE Circular BO-16 also ent 1 No urttton response renuired
KEPPLER.J O Region 3. Chicago, Office of the Director HO/06/B7
Ip.
— BOO722Q593 I.Efl SO-Oa^/O3L-<l on BQO637. rtnproi 4,000 gallons of OH
discharge tank reEodsed iii/o verification of dilution Moil to
discharga can<t) U/DIID svt water pump in eve Cmi&erl by
personnel oversight Tech Spet rpqui roments reviewed
GUflUNATIIAN. S CnmmnjiiLion ! tti Edison Co 00/07/16 2pp
8007310507 ForulardB IE Health Physics Appraisal Refits 30-295/BO-05 &
30-304/80-04 on BO0310-31. notice of violation b aionlficant
appraiial findings
KEPPLER.J O Region 3. Chicago, Office of the Director BO/06/27
00O722C"10i, UEIl flO-007 lias botn t.inrol led
CaLLIM9,H CommDiiiJBalth trlison Co OO/O7/21 Ip
80O73BO40B LER BO-OQS has been cnncel lod
COLLINS, H Commonwealth Edison Co Btl/O7/ai
— 8007310310 Notice of violation from health physics appraisal an
8QO310-2!
* Region 3, Chicago. Office of the Director BO/Oi/37 Hpp
— BOQ731Q515 IE Health Physics Appraisal Repts 30-E95/00-05 *
50-304/80-04 on 000310-21 Noncomp 1 iance noted significant
weaknesses found in areas reflecting on mgt t< mgt support
Meaknesses in emergency response t< access control
aCHUMACHER.K C. , MILLER, D E Region 3, Chicago, Office of the
Director FISHER, H L Region 3, Chicago, Fuel Facility &
Materials Safety Dranch 00/06/23 SBpp
B00731033S Foruards Waste Packaging Insp Rept 15000046/80-32 on BQOE22
t 26
D AVI a, A B Region 3, Chicago. Fuel Facility !< Material 5 Safety
Branch BO/0&/30 3pp
BOO7a2010V LfcH 00-U03 has been cancelled
COLLINS. M Commoniuaalth Edison CD 00/O7/3I Ip
DOO7220-1U Ltffl 79-049 h.?<> bei>n cancelled
COLL1NQ.M Codimunieealth Edison Co E3I)/(J//2I Ip
BOO7220112 LEU 7^-047 ftaa been L. men Hod
COLLINS, M Cc-mmiiniueal tti EdisnnCu BO/O7'?1 Ip
0007220413 LER 7'/-04d has ftepn r,mi.»))ed
CDLLINS.M Commonweal Hi feflisnn Co HO/O7/21 1 p
0007220414 LFR 77-045 hatt (IBDIA concclleil
GQLLlNSpM Comraoniuciilfcli Edistin To 90/07/21
— 8007310337 Haste Pockagino Insp Ropt !S000046/£tO-33 on B00222 b 26
Noncomp 1 ifltic e u/DOT regulations noted mai dose rati> on
surface of transport trailer was 220 mi 1 1 irem/li
O'REILLY, L A Region 3, 9an Francisco, DfPjce of the Director
THOMA8.R D , DOOK, H E Region 5. San Francisco, Fuel Faciltt« &
Materials Safety Dranch BO/04/02 ISpp
T Hearing trdriscrip ts an non-ajiti trust matters
BO071500P4 Transcript of BIWVOJ (iiorning heoi ing in tie Ihesi-a. NO Pp
1-130
» Atomic Safely and Licencing Board Panel BO/O7/01 133pp
BOO'7390641 Responds to IE Bulletin 30-10. "Contamination of
Nonradioac tiv» Bys (i Resulting Potential for Unmonitoredi
Uncontrolled Release of Hatfioac tivity to Environ " Any
affected sys uiill be restricted if contamination found
PEOFLES.D L Comfionueal th Edison Co 00/07/07 3pp
BOO729O6SO Forwards response to IE Oulletin BO-11, "Masonrij Wall
O*«ijjn " Requested investigation not performad at Dresden,
Unit 1 du» tu extended outage Requirements uill be met prior
to startup W/a encl
iPEOPLES.D L CDmrnnnuealth Edison Co BO/O7/07 3pp
DOCKET 90-303 KEUrtUNEE NUCLEAR 1'dUCK PLAMT
F Security, medical, emerge IK <j tr f\rv protcctinn [ildsris
8007&90414 Fnruards Draft 4 of facility radi nlcjj ic al emergency rciponse
plan Pldn availflble in Central files, only
HATHEW8. C R Wisconsin Publit Servit* Carp Bu/07/H3 Ip
122
DOCKETED ITEMS
Ad jud icatory
spnndence
8007310243 Furuard', Commission BOOS27 memorandum t, order containing
decisions -on Ufb 7S03O2 petition for reecns i deration of
790313 memorandum A order UCS 771104 petition sought action
re fiTO protection For electrical tables
EEOENHUT, » G Division of Licensing BO/Od/25 BVpp
P Operating license stage tfotuments !. c.orr«spand enco
8007H30099 Requests tuamittal ct proposed Tech Spec changes providing
for rorfundancii in de-cay heat rpmoval capability in all modes
of operation Model Terh Specs uhirfi would provide acceptable
resolution enc 1 for guidance
EIBENHUT.D G Division of Lirensing BO/06/11 62pp
BG07Q2Q03a R-espomilE. to IE Bulletin 80-12. "Decay Heat Removal 8ys
Operabi 1* ty " Licensee review indicates that current design
is adequate Further response mill be submitted within 1 uik
MATHEHS.E R Wisconsin Public Service Corp 80/06/12 lp
BO0702025t Responds to IE Bulletin GO-06, "Engineered Safety Feature
(ESF) Reset Controls " Hevl eiu at schema tic & logic diagram*
indicates that all applicable equipment operates in intended
manner after reset
MATHEUS.E R Wiaconstn Public Service Corp BO/Oo/17 2pp
BOa7O30OSh Forwards IE Dulle-tln BO-19. "Possible Loss of Emergency
Nntif (cation 64* (EN3> H./LOBS of OffsitB Power " Written
response r*q.uircd
HEPPLEtt.JG Region 3. Chicago, Office of the Dimeter 8O/06/1B
8007O10224 Notities op BOOilA meeting w/West 1 ngtiousai Fluor Pouier Svc
Corp k util in Dethosda. M.D to discuss steom oenBTator
support bolt annmalicG
HERHUNM, R A Division nf fleactur Operations Inspections BO/Od/13
3pp
B00733033? Lists action'; taken by util after GOOOEB-31 map nf steam
generator bolts determined that leg 1 of steam generator 0
bad four long onltt d tuo short bolts Attempt to replace
bolts ulll be made during ncit refueling outage
KftTHEHS.E R Wisconsin Public Service Corp BO/Oi/aO 3pp
— Q0072EO334 "Safety Evaluation nf Steam Generator Support Pad
Connections Having Vascanai Dolts in HolJcoit Inserts "
PARJMI.S R . 1NOU-GE, E . BEITLVUft.A V Tltior Potuer Servite, Inc
BO/Oi/la 2Qpp
BOQ7QBQ24Hi Foriijards "Nuclear Puroe Valve Stress Analuiis," in support
of reactor bldg vent valve moil
MATHEWH. E R Wisconsin Public Service Corp 00/07/03 lp
— B0070BOaOB "flu clear Purge Valve Stress Analysis "
» Pioneer Sp-rvito Si Engineering Co QO/Oi/29
BOO7a300(H Request! EUtmiltal Of application Cor flra*nd to license
CDKiiating of Tach Spec changes h licence condLtiona PUR
Model Tech Spins t< Kodel license canditioni Pur THI-3
Lesson-a Learned Cal«gorij A i tarns end for guidance
EISENHWr.DO Division of Licensing 00/07/02 i^pf*
Inspection reports. IE Bulletin* J< correspondence
BOO72303M Forwarda IE Insp Hept 3O-305/BO-10 on BOOS07 E< 19-23 Sc
notice of violation
HEISHMAWi R F Region 3, Chicago, Reactor Operations Nuclear Support
Hranch BO/06/1B Spp
— EOO723O3I7 Notice of violation from Insp on 00OS07 tt 17-23
» Region 3. Chicago. Office of the Director 30/06/17 2pp
— B007S3033a IE Insp Hcpt 5O-30S/BO-10 on B00507 (, 19-33 NoncamjiIiancB
noted failure la follow procedures !< failure to rept Ion of
offsitc puuer event uithin 1-h
WAFINlCrt.R F . CHOULES-N C . NELBDN, R L Region 3, Chicago. Office
of the DlroctDT BO/Ofc/17 7pp
FoTuard-a IE Circular 80-19. "Loss of tleactor Coolant Pump
Cooling & Natural Circulation Cool down " No written rospnntB
required
KEPPLER.J 0 Region 3, Chicago. Office of the Director BO/06/SO
S00717O528 Forward's IE Circular 80-14. "Radioactive Contamination oP
Plant Dcminerali lot Hater 8ya & Resultant Internal
Contamination of Por«onnel " No written response required
KEPPLER, J 0 Region 3. Chicaflo. Office of the Director BO/Oc,/H4
IP
B00733035f> Forwards IE Bulletin BO-16. "Potential Misapplication of
Rosemount Inc Httd H I s 1151 Cr 1153 Pressure Transmitters
W/Eithur A or D Output Codes " Written responie required
IE Circular GD-16 also arc) No written response required
KEPPLER, J 0 Region 3, CJiicago. Office of the Director BO/Q&/27
lp
9007020029 Forwards IE Info Hutice BO-aE. "flrookdouns In Contamination
Control Programs " No written response required
KEPPLER.J G Rpgton 3, Chicago. Office of tl\n Director BO/OS/2B
S007HIO44? Foruarifs IE Circular 00-13, "Grid Strap Damage in
Wratingh uusu Fuel Assemblies " No uiritten response required
KEPPLEH. J 0 flegion 3, Chitagu. OPFire of the Director 00/08/38
IP
B00701007B Foruiard! IE InPo Notice flO-23, "Laaa OP Su-ctlon to Emergonc
Fe-eJwater Pumps " rlo urittcn response reijutrod
KEPPLERiJ S Region 3. Chicago. Office of th« Director BO/OS/39
IP
BOOTO10O3(> Renponilii to IE Dulletin 00-OS. "Vacuum Condition Resulting
in Damage to Chemiral Vol Cuntrol Si/<< <CUCS) Holdup Tanks "
RIVLBU of syE de-mnne trated lhat n-tfoiuat-e protection IE
included in design Table of syfi revieucil enc.)
MATHEWS. E R Wisconsin Electric Pouer Co QD/Qh/Bt app
B007aaoa2B Foruiflrd^ IE Info Notice B0-a&, "Evaluation flf Contractor
QA Progrsm^ " ND written rnspnusB roquirpd
HEPPLEH. J Q RflDion 3. Chsuja. DPFice of the Director BO/O&/IO
H00702071A AovstBs NflC that ultrosonic insp of Vaacoma^ 350 CVM steam
generator bo3t3 was pprpormei) oil SOO-iaQ^I to roiolvo atnam
generator - roactor cnnlant pump support lamellar tearing
isajB Eililino Log 1 -, up port baltinQ IB adoquate
MftTHEWS. E R Hieconsin PuhlU Service Corp BO/06/ i I 2pp
Forwards IE Info Notic* BO-Z7, "Peg pad ation of Reactor
Coolant Pump Studs " No specific action or response
required
KEPPUER, J G Region 3. Chiracs, Office nf tlio Director BO/06/11,
IP
B007H40321 Rosponds to IE Bulletin QO-10 re contamination of
nunrad ioact i va BIJS & resulting potential for unmoni toped,
uncontrolled rolea-ED of rad inactivity to environ Several
sampling & monitoring points have been added to program
rtATHEWS, E R Wisconsin Pub-Uc Service Corp 80/07/07 lp
0007940334 Responds to IE Bulletin BO-OB. "Eiamination of Containment
Liner Penetration Meldn " Welds repaired. a» necessary . when
unacceptable results uere indicated by nondestructive insp
H-elds acceptable hu final radiooraphlc insp
NATHEWa.G R Wisconsin Public Service Corp 80/07/07 3pp
0007240119 Responds to IE Dulletin 80-11, "Maeonrg Wall Design " Four
masonry walls have been identified u/potentlal for
interaction ui/aaf ety-relatc-d equipment Walls uere designed
Seiimic Class 1 ti Purthier investigation is not yarranted
MATHEUEi E H Wisconsin Public Service Corp 80/07/07 3pp
G007atOafcl Formnrds IE Insp Rent 50-305/BO-13 on 800633-37 I. notice at
violation Notice oF violation withheld (ref lOCFfia 790)
HIND.iJ A Region 3. Chicago. Safeguards Branch BO/07/11 2pp
— Bt)073102ii7 IE Insp Rapt 90-303/BO-13 on 000633-27 Noncomp 1 lance notfld
guards not qual i Fiod . inadequate ncreenlng b improper barrier
control Details withheld (ref 10CFR2 790)
BELfiNOER.J L . CHEEO, J R Region 3. Chicago, Office of the
Director HIND, J A Region 3> Chicago, Safeguards Branch
BO/07/11 3pp
00073^0394 Aflvi5.ec that util SOG613 response to NRC B005HO 1 tr Is
unsatis factorg Results of review mill be commumiatod as
soon as possible
HEISHHAN,R F Region 3. Chicago F Reactor Operations Nucloat- Support
Branch SO/O7/18 lp
R Periodic oper-atinp reports tt related correspondence
000714O544 Forwards monthly operating rent for June 1980
MATHGWS.E R Wisconsin Public Service Corp BO/07/09 lp
DOCKETED ITEMS
123
— BOD71i0348 Monthly operating rept for Oune 19BO
RUITER.Q H Wisconsin Public Service Corp 80/07/07
B Repc-nab le occurrences, LEfls Si related correspondence
3pp
BO0731024T FariuariU Commission BD0527 memorandum !, order containing
dHcisinns on UC"5 7(Wifl2 petition far ret ons iderdttoii of
7SQ413 memorandum I. order UCS 77 1 1 04 petition sought art inn
re fire protection for electrical eagles
EISENHUr.DQ Division of licensing 80/06/39 L3S>PH
9007060396 Forwards LER BO-021/03L-0
HATHEWS.E R Wisconsin Public Service Corp BO/07/03 Ip
— B007QBQ390 LER SO-031/03L-0 On 8006I9,at hot shutdown, uh i le steam
generator uas in operation. b loudown radiation monitor R-19
u at not sampling blowdown for apprai f>-h Caused bij isolation
of monitor during performance of prostartup checklist
NALEPKA, D 6 Wisconsin Public Service Corp BO/07/03 Ip
B0071 10317 Forwards LER BQ-Q34/03L-0
MATHEWS.E R Wisconsin Electric Power
— B-QQ7110336 LER BQ-024/03L-O on B00&l?j at hat Bhutdoun, ID/steam generator
blaudoun in operation, radiation monitor R-19 not sampling
bloudouin for appro* A-h Cause not stated Sampling ays being
ravieued for initial conditions
WALEPKA.D S Wisconsin Electric Power Co 80/07/O3 Ip
80/07/07 Ip
Forwards LER 80-026/0) T-O
rWTHEH3,E R Wisconsin Public Service Corp
--80071*0474 UEH BO-036/01T-0 on BOOhSt. refuel ihg water storage tank
lavel fell below Tech Spec limit Cause unidentified Makeup
was initiated immediately & Tech Spec level was restored
Investigation in progress ti updated rept will be submitted
NALEPKA.D S , SMDKER.C B Wisconsin Public Service Corp
BO/07/OB Ip
Forwards LER BO-03B/03L-0 !. updated LER BO-Q19/03L-1
MATHEH3.E fi Wisconsin Public Service Corp flO/07/11 Ip
0007160502 LER BQ-023/03L-0 on BOO&17, five containment isolation valves
found u/unaccBptab le leaVage Causes unspecified Two valves
riplaced> two seats cleaned, t< one stroke adjusted Subsequent
leatrates below Tech Spec limits
NALEPKA.D B Wisconsin Public Service Carp 60/07/11 Ip
0007250122 Amended Content i or, s 1 !. *" !< iuitndraui.il nf Contention 3 Amend
ro-que&t riooi nut inntsii> snfetij .analysis rp spent -fuel
storage d docs nat contain analysis of spent fuel pool
eipansion cons enucnc as Certificate nf Svt encl
OLSON, J r , SEMECIWL. M E . SPANNftUb. U Minnesota. State of
BO/07/ai 7pp
BOO73104'?3 Confirms ftSLn requu&t f »r heaunjj space at federal bldg in
Saint Paul.MN on nQOEJOt to fonUurt 1 -daij pretieflr ing
cniiference r« Facilitij
STEPHENB,C R Docketing f. Servile* Drnnch 90/07/23 ip
BC-07350f>Bfl Comments ^toting mi objertion to admission of State Qf MN
HOD731 Contention? 1 r, S r e ca-.k drup arcident & loss of
water accident in spiiTit fuul [inols (icservcs rights re
Bubatnnce !< validity nf co-n ten ti ons Torlific-ite of ^vc encl
DARTH, C A Hearing IlTanch 3 BD/0//2S 2pp
Sha
BOO730O'lfi3 Responds to State of MM SOO'IS'I supp) to petition to
Intervene li 800721 ,-imenileil rontentiuns Supporting
documentation, notices of appearance uf Jb Sllierg !t DL
Bernstein on bahalF uf util %i Certificate of Svc oncl
B1LBERO.J E Nortliern Status Power Co S1LBERG. J C
Potts *t Trowbrlrtge BO/0//23
H flener^l
B007310"i2ii Res-ponilB tn BOOS36 Itr i •» constituent concern about
uvacuation routps around f-acilitieB HRt !^ FEMft engage in
program to upgrade omar-gDncij preparedness including
evacuation p I aiming
DIRCKS.H J Office uf the E.fcutivo Director for Cl|)eration5
BO/07/24 Sap
BQ07310S2a Requests info r
routes around futilities
BOE5CMN1TI, R Bonate
about, evacuation
(jpp
-80Q7UOS10 Updated LER BO-019/03L-1 on B0061 1, sh ie)d bldg ventilation
SUB chscfc damper SBV-lOA failed to fully open Caused by
controller setpoint drift Betpoint adjusted !< denign change
itudg initiated
^fALEPKA,D B Wisconsin Public Servico Corp 80/07/lt Ip
B0072BO66S Foruards LER BO-027/03L-0
, E R Wisconsin Public Bervice Corp
~ BO072BQ674 LER QO-OS7/03L-0 on 800621 . during cooldouin. diesel generator
IB Failed to start on occurrence at inadvertent safety
injection signal Caused by air start motor solenoid valve
containing moisture & containments Tanks blown dru,
NALEPKA D S Wisconsin Public Service Corp BO/07/81 Ip
BOU7aB0678 Forwards LER 80-02H/03L-0
MATHEHS.E R Misconiln Public Service Cnrp
— 3007280605 LER 80-02B/03L-0 on B006S3, durlnfl hot shutdowni cond eniate
storage tank (uas twice drawn below 75,000 gallons through
normal mater usage for plant startup Caused bij normal
high water usage during startup Following refueling
NALEPKAiD S Wisconsin Public Service Corp BO/07/23 Ip
DOCKET 00-306 PRAIRIE ISLAND NUCLEAR STATION, UNIT S
F Security, medical, emergency (t fire protection plans
B0070a0235 Forwards Tequest for limited revisions !< addl info re 79O323
plant safeguards canbingenci) plan Encl withheld
<r«F 10CFR2 790)
CLARK, R A Operating Reactors Branch 3 30/06/10 3pp
P Qporatlng litensc stage- do-cumpntn & corrobpondencp
800733007'? Itequests Bubmittal oF pmpuceil Turh Spec thiinnes providing
for rodunrfflnc y in docaij heet rpuioval tdpability in all modes
DP operation Model Tech 9p«ii uihich would provide jcccplahle
rEBolutton cncL for guldanLi'
ElStNHUT.D Q DiviHinn or L icciiMnn BO/O6/11 bZpf
BO0703O323 Not i Pies NRC af Intontion to ship radinactivo mntl from
racilitict using M^del HN-&00
MrtVER.L 0 Northfrrn States Power Cn SO/Ob/l'J Ip
OO0701O5B! Responds t-o BOOS) i Sir ro containment purge info bij
forward ing relates correspondence
MARTIHjR ft auuruting ReacttiT* DrariLh 3 HO/06/ in 2pp
— B0070 103B3 Responds tu EGf.Q HOODIH nucstinns LDCA do-so calculations not
completed Mom lure are rpduiAilan t . gas ", particiilalo monitors
provided^ each giving isolntlnn -^lynal
MUSOLF.D Horlhern States Poutr Co 00/06/0') Ip
— BOO/OIOISB Requesti; pru 1 iminflry nvaluation of licensee response to NDC
791O29 "Interim ros-ttiora for Contdinment Purge ti Vont Valve
Operation Pending [tHSOlution nf [nalatien Valve
Dper ab 1 1 1 tijj " Generic Item B~*><) Evaluatinn Form oncl
REEVES, E A Opi-rarlng Reacttirs Branch 1 <Pre SOOflBB) 79/12/27
00O701O376 Toruiarris UeBtinohonfie rept BO-^09-PHftIR-[J 1 , "Eiamination
at Prairie Island £! Inconel Alloy ft 00 Steam Oe•nDr=to^ Tubci "
resulting from (1003-12 (neating re Jan 1900 inin Hept luithheld
(rof 10CFR2 790) Util B00627 llr onrl
MAVEfi.L Q Northern fltaten Poioer Co RO/O6/07 Ip
B007110118 Forwards response to NRC 600ilB tiuvstions re safe thutdoun
In event of fire
MAYER, L, 0 Northern States Power Co 8O/O7/OB 3pp
0. Adjudicator^, correspondence
B0071O020B Ack receipt of NHC B00619 Itr to 0 CharnoPp re nonreceipt
op State of MN 800424 contentions Certificate af Bvc end
OL8DN, JF Minnesota, State of BO/06/23 3pp
— 8007010381 Submits application to uilhhold Heslingdou-se research rept
QO-SD'J-PRrtni-Rl, "EiamirntiOTi at Prairte Island 3 Inconel
Alloy 6QO Steam Oencratur Tube," <ref lOcrRS 790> Affidavit
supporting reiiuesit oncl
MAYFR.L O fJorthern Statea ^OUIBT CD 80/06/27 3pp
BO0717O076 Summary of BQ0520 mei'lins w/util re TOPItflR fuel deniijn
MAF1TIN.R Operating fleactavs Branch J EJO/07^01 7pp
124
DOCKETED ITEMS
0007330001 Requests subrnittal of application for amend tp liccnst
consisting of Teed Sf-ec chanjci !, license conditions PHR
Modi'l TeLh Epera d Mode] luenso conditions for TMI-2
Lessons. Learned Catcg-nru, A items pncl For guidance
EISENJUJT,!) G Division of LictTising aO/Qi/03 -filpp
BO07J60IB2 FriruardB IE inFd Notice 60-37, "Degradation of Reactor
Coolant Pump Studs " No specific action or response
required
KEPPLERp J G Region 3, Chicago. Office of the Director BO/06/11
rtdvisss af intention to s-tiip radioactive matle from listed
facllltips using Package Model CHS! AL-33-9O
WIWEP...I- 0 Northern States Power Co no/07/03 Ip
6007240303 Advitea of NJ!C reorgani i atl on un [300439 y|i 1 c h resulted in
nurnnor of changes in n Ft 1 1 1 IBR, poei tinns & assignments of
.psrSonnuL Also submits info for OCTR
K. T M Assistant Director fur Operating Reactors BO/O7/OB
BOO7aSO41O Forwards comments un NUI7Efl-O577, "Frfltturo Toughness t.
Suseopfci b 1 1 Ity ta Stress Corrosion Creeling af Equipment
Supports," tn i Pspnns-B to Nf!C BOOS) 9 request Ail d 1 analysis
MAYEIM. O Northern States Pouej- Co CO/O7/H1 5pp
Q 1 nspeLt i on, roporti, IE Bulletin's t< i arm apondenc e
B00707OOS1 Forwards IE Insp Repts "iCl-SaS/BD-Of, R 90-30J>/eO-07 on
800401-30 i noti-ce oF diviaticn
HElSHMANiH T Rogion 3. Chicago. Rede tqr Op prat i ons Nuclear Support
Branch BO/05/21 2Pp
— BOQ7070O56 Notice of deviation Frnra insp on 000-101-30
* Region 3. Chicago. Office of the Director BO/05Jii> Ip
QOQ7O20054 Forwards 1C Info Notice BO-22, "rtreafcflauna In Contamination
Control Programs " Ho urittcn response required
KEPPLER.JQ Hi-gum .3, Chicago, OPFite oF the Director SO/03/3B
BOO70103&2 roriLiaT-dB IE finulfl-r RO-13. "Cnd Str-ap Djimage in
WestlnghouEC Fiiel A-BSpmbl 1 e •. " Nn urlttHn response reiulTD-d
KEPPLER.JG FTpglon ^, Chicago, OFFic* of tJi » Director DDX05-/3S
BOt>70IOJ27 Foruards IE Info Notice 00-33. "Lous of Suction to
feediJater Pumps " Nu unttcn rc5pofi5B required
HEPPLEB.J G ll«ginn 3, Chlcaa"- Oftico nf th* Director
O007030Q43 Foruiarcta IE Dti I latin 00-19. "PosslblB LOBE of Emerflencg
Notification Sys. (EMS) M/Losa of Dffaito Power " Written
fBEponse required
KEPPLEH.J 0 Region 3, Chicago, Office of the Director BO/Q6/1B
IP
B00702OS73 Faruards IE Circular 80-15. "Lous of Reactor Coolant Puop
Cooling 6 NatiJTfl-1 Circulation Cooldoun " No yritten ro»pon»e
requ i rod
KCPPLER. J 0 Region 3. Chicago, Office of tho Director BO/Ofe/20
8007140074 Act receipt of end S00617 Itr infarwino NRC of iteni t»h«n
ID correct vloistiura noted tn NHC 000533 Itr Encl withheld
(re* 10CFI?2 790)
A Itegnpn 3, Chicago. Safeguards Branch 80/04/H4 Ip
SQ07170SO'i> Forwards IE Circular 60-14. "Radioactive Contamination of
Plant Do-mineral i iad Mater 3y& b Roaultont Internal
Contamination of Personnel " No written response ruquirett
G (legion 3, Chicago. Office of the Director B0/0ii/a4
Ack receipt of BQOltlS Itr informing NF1C of iteps tahin to
correct Jevi.itton noted in IE Insp llepts 50-aB2/BO-Oi b
SO-306/BO-O7 Foruarded bij S00931 Itr Senior roBident
iTitpectar Liill fnllou remaining testing
HEIBUHAN-R F Region 3. Chicago, Reactor Operations Nuclear Support
Branch BO/O6X35 Ip
— B007I4OI9S Reaponds to deviation noted in IE Insp fiepts 30-393/80-06 &
30-306/00-07 foriuardHd by B00531 Itr Special insps of tuo
out of Pour power operated relief isolation valve motor
starters have been completed TUID others mill bo performed
GILBERTS- D E Mnrthorn States Power Co BO/Oi/12 Ip
3007330336 Forwards IE Bulletin 80-16. "Potential Misapplication at
flDEemaunt Inc Models 1131 b 1 132 Pressure Trannmi ttara
H/Either A or D Output Codes " Written response required
IE Circular 60-14 aluo encl Mo written responEO required
KEPPLER.J Q Renion 3, Chicago, Office of the Director BO/QA/B7.
If
8007340103 Fnr^ardi IE ]i>«p flepts 50-t!U2Xe:O-09 t, 50-306/90-10 on
B00301-31 Ho none omp ) lance nnted
H£]3HhWN,R F (iff a ton 3. LhKaoo. Reactor Operations llucledr Support
Branch
B007l7Olflt rtc* receipt of 800523 Itr informing NRC of steps taken to
correct violation noted in IE Insp Kept 30-306/78-24
FIOflELLIjO Region 3i Chicago. Reactor Construction b Engineering
Support Branch GO/Oi/30 Ip
— BOO7240210 IE Imp Wept* ")0-2tia/BO-09 >, 5Q-30A/Bf)-10 on B00501-31 No
no-ncDrap I lanes noted Major areas inspected uMint,
Bb-rvcl 1 lance, BBC uri tij , rfldict i on pr otoc 1 1 on. t a \ louiup of
licensee report&rt evontfi ft folluuup to III circulars
FEIEfiAOtNLI, f D . BURGIT'iS.D I , COVD. D C Region 3. Chicago, Office
of the Director RO/O6/05 ipp
8O070!d^60 Rosponds to IE Bulletin /9-1 7, Revi tlon 1, "Pipe Cracks in
Stagnant Bor.ited Water figs rit PHI? Plants 1] Visual Insp
romplptpd on Unit 1 ui/no
agr
required by Item ?(a>
corrective actinni necessary
OILDeUTE), D E Northern Stats* Pniunr Ci>
BO/06/09 III
3007010267 Respond!, to IF Gulletin SD-06. "Engineered Bafeto Feature
Res-ot Controls " SrifoKj ags. SEliomatirs reviewed Test
demon-strat ing ^nfofij equipfliont rpraaina in cmflrgpncij mode
after reset will be i.ompl«ti.'d nt neil refueling outage
QILDEffTS-n E [Jni-tWrn Stareg Power Co BOyOi>/09 2pp
S0070J014') Responds to IE Bulletin fiO-Ob. "Vacuum Condition Resulting
In Damage to Ctipmital Uo I Control Sus JCVCS) Holdup Tanks "
Chemical ti vol control siji tr cD^prnpnts t< gaseous (' lltjuld
waste tUspOiii! r>yi> ti cam|icni?ntD uinre rcvl^uied
E Horthprn Ht'itefi POUOP Cn BO/OA/09 2pp
C007IA0707 Responds to IE Dullpt-m BO-OS Review of choriical fc vol
contro! sijs indicates holdup tanft vu 1 nccali > II ty to collapse
Uou s-uctton prcsHurc trtp bo be installed OR holdup tank
transfer r< rer imiJat ion pumps by niOlOl
9!LDERTS,DE Moi thorn St.l tt s. Puuol CD 80/06/09 Sff
8007220313 Foruaiijs It! Info Hotite BO
OA Programs " Wn written respoivse t
KEPPlEfl.J Q riEaion 3. Chaiago, Clffice o* the Dlractor
IP
"evaluation of Cnntractov
QO/Ob/lO
— 8007170194 Responds to NRC 790123 Itr re violation noted in IE Insp
n»pt 50-306/7B-24 Corrective actions replacement of snubbers
planned far refueling oh utdouns. unl ess earlier cold
•ah Jtdoun oe-curB-
OILSERTS, D E Northern States Pouier Co 00/05/33 Ip
0007150431 Advises tJiat deumnstratl on nf ultrasonic insp method for
detecting undorcla-rt cracking in reactor veaael noule rojion
For Unit 1 is scheduled POT U00723 Unit 2 insp tail I take
place iturino 19B1 refuelins outaoe
HAVER, L. D Northern Btates PEiuer Co BO/07/O7 Ip
BQQ725-0077 Forwards response to IE Bulletin 80-11. "Masonry Hall
Design " Concrete bluet walls arc not In same design
philosaphij an design of Trajan plant masonry walls Malls
mere jensrallij designed at partition uulls or shield ualtl
OILBERTS.D E Northern States Pouer Co SO/07/OB 51pp
0007220090 BubmitE reply to IE Bulletin BO-OB ru eiamination of
containment Unor pe-netratlon uields Revieu of Unit 1
Tovealad tuo dePicient uieJda Further response will be sent
bu sooaio
O1LDERTS. D E Northern States Pouier Co BO/07/10 Ip
50072205*12 Submits reply to IE Bulletin 79-01B re environ qual iPicatlon
of Clsfla IE equipmetit OualiPifd limit switches have been
ordered S. ere scheduled for replacement during future
outages hlorkshoets encl
QILDEF1T9. D E ND-rtftern States Power Co BO/07/10 Bpp
B007230211 Su*m»ts replil to IE Bulletin 79-17 re pipe cracks in berated
yater ?\js Visual msp required bij bulletin was
sat isfac tori lu lomplofccd For Unit 1 No corrective action*
necessary
GILBERTS. D E Northern States Power Co 60/0//10 Ip,
DOCKETED ITEMS
125
R Periodic operating reports !< relatoit correspondence
OOO703O17B ToT-martls "1979 Environ Monitoring t> Eculogical Studies
Program Rept, " Vols l t, 2
HARD, E C Northern States Pouer Co BO/O6/30 Ip
— 8007030100 "1979 Environ Monitoring t. Ecological Studios Program Rcpt.
Vol 1
» Northern States Power CD E10/06/30 3S3pp
— B00703Q183 "1979 Environ Monitoring b Ecological "Studies Program Rept.
Vol S
• Northern States Primer To HQ/O6/30 32Spp
8007160390 Forwards monthly operating repts for June 19BO
MAYER, L O Northern States Pouor Co 00/07/11 Ip
OD07G3O24Q ricinnnse in opposition lv licensee notion to po5tponE
preheanng c onf ei u>Ti( P until ufter tiOlijOl Suggests modulate
delay until mid-Aufj I960 Fi.i litfuspe to tansiifri amend re
site spont fuel &tciTai|6 Cur 1 1 ncatt of ^vc end
REIS, E J Hearing Branch *J (10/07/02 5pp
B00730Q1."2 Appeals /\BLB BOO/11 rnernardndum *, urdei on sctioctul ing
pretiearing conference Urges reversal nf order t, convening of
special prehuanng ton*eren<P rert;if icate of S\ c end
MILLER.D S Sensible- flame Power MILLER. G S Mikler.DS
80/O7/?6 3pp
— 8007300127 Diicf in form of pleading 1.1 support of intorvenor 8
appeal from ASLD QOO7H mpmaranJum !. order on scheduling
prahearing mnf erenLP Alleges denial of procedural due
process for cjtse 1 am Urges hulding of special pretiearing
MILLER, D S Sensible Meant Pouer MILLtR, D S Miller, D 3
QOJQ7/26 lOpp
— 8007160362 Monthly operating repts for June 1980
HUNSTAD.A A Northern States Power Co BO/O7/O1 9pp
8 Rtportable occurrences, LGR& t, related correspondence
S00731O16.3 Memorandum t- order , AUAD-iOr', d l smi 55 i ng Seneible HE Pouer
apjteal f l am AB1 D 80O714 ordei uihiih ptittponeil prehparing
coitpprence in ^pent Fu(?l ponl compaction prnt^edinQ
DISHDP.C J Arumic B^fety dnJ lirensing Appeal Panel HO/O7/29
B007O10324 ForuiardB LEO 80-O16/O3L-0
MAVERiL D Northern States Power Co 80/06/27 Ip
H General torr-tspdnilonce
— 0007010329 LER BO-016/031.-0 on 000529, during instrument calibr,
instrument uas dropped on trip throttle valve linkage,
tripping valve b making pump inoperable For 3 minutes
Cauied bg personnel error
HUN8TAD, A A Northern States Pouier Co BQ/Oi/27 Ip
B007210379 Forwards LER BO-OI7/03L-O
MAVEFt.L 0 Narthern States Power Co
— 8^07210390 LER BO-017/03L-O on 00061 5, during normal operation, found
on» charging pump out of svr Charge pump 23 started &
ihut dayn Caused bij air leaks on speed control unit due to
broken pat Hug ring Packing ring replaced
HUNSTAD, A A Northern States Pouor Co BO/07/14 Ip
6007250340 RO SO-SO on B00715, lu/Uni t 2 at 100? power !, Unit 1 at cold
ihutdoun, main generator separated From grid !i one nffsite
lource u»f losti tri pp ing reactor I* coolant pumps Caused by
itvere electrical storm Transformer rostorad
TIERNEY,F P Northern States Pouer Co BO/07/16 Ip
DOCKET BO-ao? MAINE YANKEE ATOMIC PPWER PLANT
F Security, medical, emergency Ii fire prntection plans
BO07100455 Forwards request for artdl info for review of wtil 790323
itcurity contingency plan Enc 1 withheld Iret 10CFR3 790)
MOVAKiT M Assistant Director for Operating Reactors BO/06/19
2pp
BOO7I70'H4 Foruarda NRC comments on emerBi-ncy plan Responses to
comnints must be submitted bij EJQQ&3O
NOVAKiT M Assistant Director for Operating Reactors BO/Q6/S&
9006330370 ftc t receipt pf NF<C UOO609 Itr t< enc 1 evacuation time
estimates tut fjcililij Cstimntps da not ailpquaU-ly define
rUk in terms oF tntal population Multiplier r>f 3 4 for
Doathbay roainn is much too lou
OARRETT, E O Affiliation Uiilinoun SO/O6/16 3pp
BO071 104B1 Requests tftdt name uf RR Radtliffo ho ispldted u/TH
Macdnnald on ME Uiit of Cnci gy He^ouri es mailing list for
cot-reBpofid pnco re utils
MACDDHALD, T H tl.iino. Statf of 110/07/01 Ip
1 Financial information
00070BO217 Forwards comiiany statummit of capita] requirements !<
sources Per CYBO
CRAQTREe.R A Mainp YankPC Aiumic Power Co BO/07/01 2np
P OpBrating licunsf stage dorumantft !< cnrrecpondcnci'
B007H092S NotiflLritign of IMJtibOP mwnling u/ulil in !)oth«silfl, MR IQ
discuss effeit at uulomatic initiation nf nmilianj
Peedwatir syB uposi ctiiisequc-iii M. nf slenm 1 1 n.(» bi enk
accident
NELSON, (. C Operating Roortnts Dranth 3 NO/05/OI 2pp
B007330099 Reciuest'S aulmittal of prnpr.t.ed Toi h Spec l liangBB prnviiJing
for redundoncy in det^iy he.it T cinuval tiip.ibility in .ill model
Of operation Model Terh Spt-CB uhiih uniild |il-(ividu stceptable
resolution end for- guidance.'
EISENHUT, D Q division of liicnsins) 00/Od/ll iJpp
B0071101J3 Hotificfllion of UPOihfl "it'el
discuss NFir veriloti of CT1*
REQIM.Q Openiting Reactor- Itranr h
u/i'til in rii'thcBitd. MD ro
RO/fVi/19 Ppp
0 Ad judlcotory correspondence
9007310243 Foriuards CommiBsion SOOHS7 memorandum J> orflar cnntalninB
d>ci«<ans on UCB 780 5O 2 petition for reconsideration of
7BO413 memorandum t order UCB 771101 petition Bought action
re fire protection for electrical cables
EIBENHUT.n G Division of Licensing BO/Od/aS B9fip
B007O30i07 RaspanHB In opposition to applicant motion to postpone
special prehearing conference re spent Puel pool moil
proceeding Urges scheduling at earliest convenience due In
significant benefit to all partiea, inc luding applicant
MILLER, D B Sensible Maine Pouer MILLER. D S, Miller, D B
BO/06/26 Hpp
— HOO703Q610 Memorandum of points & authorities in support of intervonor
apposition tu applicant motion to postpone special
prehaarlng cimfEi-ence Public interest is better served by
rapid decision, per case lam Certificate of Svc end
MILLER, D S Sensible Maine Power MILLER, D 8 MUlei-.D B
80/06/26 tpp
B007O10070 Responds to FO1A rp[jiii>st For 57 documehtt rpf ert'lic ed in H
Toliar memo In Atnfi conceining pul let -t Ifiddi ng intoractio-n
Forwards dummer! l*> Mitaing i-ei nrili ai u dup 1 it at-i jt:
BUpcrsedn-il or avjilahlo e 1 s-Piud t>ri
FELTQN.J M Divir.ion of l?ulc« dud Hctind" 00/Ofa/PO 2pp
— BOO70100i17[J ForuiarJi, i.urrmor g nl- 711 H? mefiii ng m/util in Dethesda. M
disiusc. einminatitiTi of Curt 1 futl dt>!>mnli 1 1 as !< ilure 1ft
ro'Sbsemb] y pnicedurua Let nf iittpndi'n ent 1
HOUSTONi M D Atom 1 1 Enirrtji) Commi s = inn, IDiref tnr.ite of Licensing
71/12/11 lOpp
800714046S Notificahioit of HOO/10 mrt'ting ui/iHt'ntPB to [liacusc
shortnoap vturyeon t.ifcen ( T am intake ttruLttirp [in HOOfiOS !.
13 ti to discing dntnils of inr idnnts tr<in<>mi Iti'd bif NRr
BOO&Bfl Itr
REOUA.G Opcintiiiu Ftcac lur*, liiflncli 3 tiO/O/i/i'4 ,!pp
B00717006.Q Koiu,nd& rt'aue^t- fni aitrll info n detail £ of 000603 *i 13
discovi-riPE of 'ilmitnnsp sruf i|fon. endflnger ed bper i u>>: in
facilitv intake alructurn nv.ift ifspnris.cE will hi! discussed
at B00719 site vi«sit Formal rtnponse dm' 2O dayii trnrn visit
NOVAH.T M Ao-viBtant DiriSLtur ftn ppPTriLing Re.ittnrs 80/06/26
3pp
126
DOCKETED ITEMS
B007Q30225 Submits response*, to NR<
OROCE.n H Maine Yankee Atrinic Pn
far add] info re
oltages
13pp
Q007O<?O2^5- AcNists NRC of L amp lot I on of evaluation of effects Of
asymmetric LOCA loadings Design ti.jsi5 >< safety evaluations
d»scnbe<J in FSAR die not aiiver inly affected bij asyinraetri c
loadings resulting from postulated LOCA
GRftCE.R H Maine Vankep Atomic POUIPT fa BO/O7/01 2pp
BOQ7250GOI Requests suliroittal of appl iLatian fop amend to license
consisting of Tech Spec L Ganges Ti luense [nnditlone PHFt
.Model Tech Specs l< Nndel Intense conditions Por TMI-3
Lessons Uearned Category A ittnu enc 1 For guidance
EISENHUT.D G Division of I j-re-nsjng 00/07/02 6<!pp
BQ072I0573 Forwards IE Info Notice BQ-Bb, "Evaluation of Contractor
<JA Programs " No written response required
GHIER.n H Reoion 1, Philadelphia, Office of the Director
00/06/10 Ip
80Q7UO-352 Fnrinardf. IE Info Notice 80-27. "Degradation of Reactor
Coolant Pumps Studs " No specific action or response
required
GRIER.B H Region 1, Philadelphia, Office of the Director
Ip
BQ07230377 Forwards IE Insp flopt 5O-309/8Q-07 on B005O8-Q9 No
noncomp] iar,cc noted
BFiUMfJEF!.E 0 Rpgmn ]. Philadelphia. Reactor Operations Nuclear
Support Branch HO/Qi/IB 2pp
BOOyoiOaaa Notification of H00713-lft meeting u/utll in HI icauBSt, HE to
discuss answeri to NRC 6O0701 questions re instrvice teat
program
REQUrt.Q Operating Reactors Branch 3 BO/O7/O3 Ip
B007S-t034fa rtdviBHs of NRC rBorgflni ;a t i on oil B004Ba which resulted in
number of changes In uft ti 1 1 e t,, |IUG i tioiiB ti asi i gnraen 1 1 of
personnel AlBD sulimits info for GETR
M Assistant Director for Operating Reactors BQ/07/Q8
8007HO33B Forwards VOOAP-I-A. Rpvis I on B.per NRC B00703 requaifc Also
foruarda iJocumont Lhange instruct i ona fur removing I<
inserting correct piages
HEIDER,)- H Yanki-p Atomic Elettnc Co BO/07/O9 Hpp
— B007U0312 Advisee that VUQrtP-I-rt, Hevia i on B. ) s accBfUablB ProoTammat ic
ehanges should IIP -submitted to NHC fur rpvieu prior to
implementation Requests thrit 1 tT replace SCO 4 10 1 tr ?< rapt
b* renumbered u/revision !< iubmi tied to NRC
HAASB,M P Quality Assui .incf Rranch 00/07/03 Ip
800721002O Foruarils request For rtddl info, pe inoervice testing proaram.
to complftc review Draft rcspnnsoB will be discuES-Ei) duri-nj
6007 S3- 16 maeting Reup ttnBCB ahuuld be furuinTried bi| BOOBli
NQVAK, T H As5i%tant Di ret I or for Operating Reacton HO/07/09
BQQ733Q104 Application for amend to App A of LUenifl DF"R-3Ai consi itlng
of proposed Change 77 to nudiPij Tech Spec Ci 10 11 re reactor
protection sgs setpointa
JOHNSON. W P Maine Yankee Atomic Pnuior Co 90/07/16 3pp
— aoo7290flf}9 Reviaeil Figure "J 1O-J af T*ch Spec 3 10 11 re reactor
protection 5ijs st-ip ol nts, iiibmi Ited in prupD^ed Change 77
* Maine- Vankue Atomic Power Co EIO/07/1>6 Ip
B007280131) Suhraiti alternate methnif of mitigation cffettB of grid
degrailal Ion on iaf etg-relateil cl ectricn! equipment
Engineering for muds uill tie cnmpleted by Kav 19BD
VAMDENBURCH, B Yankee fitomle Electric Co BO/0//a-» 7pp
— S007230383 IE Inap Hept 30-309/60-07 on 800303-09 No noncompliance
noted Major areas inspected follouiup on selected LERi b
licensee action to limit online cnntainmBnt purging d
vontilfltlon
LAZARUS. M Roglon 1. Philadelphia, Office of the Director
MAFITlNiT T Refit on 1, Philadelphia. Reactor Operation* Nuclear
Bu-pport Branch aO/O&All 5pp
3007170321 Foruardc reBpannit to IE Bulletin 30-Obi "Enginiend £3»feti)
Feature (EBF) Reset Controls " Changes uero made to preclude
automatic loss of containtnent isolation as result of
rvsettlng containment Isolation signals
Maine Yankee Atomic Poyer Co BO/O6/13 9pp
BOO 7 03070 7 Forward » IE Bulletin BO- 13. "Possible Loss of Emergency
Notification SUB (ENS) U/Loss of Offslte Pouer " Written
response- required
CfftER.O H (tngion lj Philadelphia. Office of the Director
EO/Oi/lB Ip
00O7030B01 FoTuards IE Cirtuler BO-19. "Loss of ttgactor Coolant Pump
Cooling ti Natural Circulation CoDldouin " No written roipoiio*
H Region 1. Philadelphia. Office of the Director
BO/Oi/20 Ip
G0071fia7il Forward a IE Circular 60-14, "Radioactive Contamination of
Plant Uemincral i lei! Water Sys R Resultant Internal
Contamination of PeTsornel " No uiritten rESponn'e requirsil
CRlER>0 H Region 1. Philadelphia, Office of the Director
ad/OA/24 Ip
6007910204 Forwards IE Info Notice 80-24, "Lou Level Raduaste Burial
Criteria " No written response required
SHIER. B H Region 1, Philadelphia, Office of the Dirnctor
BO/O£>/25 Ip
8007280453 Responds to IE Bulletin 77-11. "Seismic Analysis for
As-Built Safe tg-Relateil Piping 9ijs " Twenty -two piping iijs
reanaliji'ed due to ptpe £</or support function or location
di f ferflncea 1-dentified in Field effort
MODDV, 0 E Maine Yankee Atomic Pouier Co 80/06/25 4pp
0 Inspection reports IE Culletihs. & [Orrnspondencp
BO-07O20163 Foriuarls IE Info Notue BO-23. "BrenVdoiuns In Contamination
Control Programs " Nn uiritten reepons* required
QRIER. B H liegio" !• Philadelphia, Office of the Director
BD/05/2B Ip
B00701031A Forwarflt IE Info. Notiie BO-P3. "Loss of Suction to Emerjency
Feeduater Pumji a " No wntton response roquir-ed
OfllER.B H Re-gion 1. Philadelphia. OFPleo oP Hie Difcttor
00/05/29 Ip
Btt07jaOfl70 Submits reply to IF Bulletin 80-03 ro vacuum condition
resulting In damage to holdup tank's lloasui e-s described are
adequate to prutert rtgalnst enc«'jBivi> vacuum conditions No
corrective actions are plnnncil
MOODY. D F M»»ne Yankee Atomic Pounr Co HO/OA/0& 2pp
B0073303S'5 Foruiarrts IS Insp Hept 50~aO9/HO-OA on 800407-11 t, ai~2fl Ho
nontorapl Jane B nut id
BRUN»EB,F J Region lj Prtlladelpn i a. Reactor Operations Nuclear
Support Branch SQ/06/OV 3pf.
9007330132 PorwardE IE Bulletin 80-16. "Potential Misapplication of
nosemount Inc Models 1133 ic 11SB Pressure Transmitters
H/Either A or D Output Codas " Written response rectuired.
IE Circular BO-li al-so enc 1 No written response required
OR I El!. B H Region 1, Philadelphia. Office of the Director
BO/O6/27 3pp
B007310601 Forwards response to IE Bulletin BO-11 Masonry uialla in
proilmi tij to s.if eLij-rela ted sys described in Bncl table
OOHNBDN, W P Maine Vanhac Atomic Power Co BO/Oi/30 3pp
OO071404O3 Responds to IE Bulletin BO-OB, "Examination of Containment
Liner Penetration Weldn, " Flued head designs to/containment
boundary butt welds not used !< containment panetration ueld
repairs not required during facility const
MPODY, O E Maine- Yankee Atomic Pouier Co BO/07/01 2pp
Fl Periodic operating reports d related correipondenc B
B0072103d7 Foriuardo, "Effluent t, Waste Disposal Bemiannual Rapt, Jan-
June 1979 "
&ROCE.R H Maine Yankee Atomic Power Co 79/OB/29 Ip
-80073303^0 IE Insp Rapt SO-:!09/BO-Ofc on t!00407-ll Ei 21-34 No-
non compliance noted HA JOT airitas iiiipncted acceislftle areas,
lojs St rstorili !i IJirenBc-e action nn sele-cted pi evlous insp
findings
LAZARUS, g. MARTIN.T negton ), Philadelphia, Reaefcgr Op&rntions
Nuclear SuppOTt flranch • BWfirLftND.P Rea'o" '• PHiladelphia.
DfUce of thf Director SO/nt/OT Hpf.
—80072:10369 "Effluent fc Waste Disposal Semiannual Rept, Jan-June
« Maine Van*ee Atomic Pnuiec Co 77/OB/B9 9pp
BO0711O3Bt Forwards discharge monitoring rept for Mag 19BO
OARRITV.J H Maine Vanhes Atrnnic Power Co BO/O7/07 2pp
DOCKETED ITEMS
127
— 8QO71103B9 Discharge monitoring rupt for May 19ao
FLANDERS, N Maine Yankee Atomic Pouer Co
P Opera ting 1 1 ctii
5 t j g i? i] [
torrc bfl ondenc i
Spp
SQ073BOt04 Forwards discharge monitoring ropt POT Juno 1<?BO. submi tteO
to ME Dept of Environ Protection Transmltta! Itr ent 1
UARRITY.J H Maine Yanfcee Atomic Pauier Co BO/07/34 5pp
— 9007280611 Discharge monitoring rept for June 1980
• Maine Yankee Atomic Pouer Co 80/O7/1B ton
R»p or table occurrences, LEFts t. related corfespondenc
BO07010339 RO 80-15/OlT-O during engineering review, discovered tjiat
Cycle 3 analysis did not consider four-stop, long-term
innrtion of control element assemblies allauied by Tech
Bp*cs, Which would permit loss conservati VP operation
WOOD.E C Maine Yankee Atomic Pnuer Co BO/O(,/29 Ip
BQ070B0413 Forwards LGR aO-Q16/03U-O
HODD.E C N-ilne Yankee Atomic Power Co
— BOQ70B0417 LCR SO-01&/O3L-0 on E!QOb05. during startup at 15X poiuer. steam
generator 1 outlet steam pressure found higher than other
two pressure* Caused by mail failure in heat affected zone
of guide to disc ueld Pieces welded
BRINKLER.J E Maine Yankee Atomic Pouer Co BO/07/03 IP
BOO731043B Forwards LER BO-O15/01T-O
WQOD.E C Mama Yankee Atomic Power Co
— 3007210431 LER BO-013/01T-Q on 800635, anal yai B performed for Cycle S
did not consider four-step, long-term Insertion allowed by
Tich 8poc Reanalysis completed Tech Spec change will tie
submitted
BRINKLER.J E Maine Yankee Atomic Power Co BO/07/09 Ip
DOCKET 90-311 SALEM NUCLEAR GENERATING STATION, UNIT 3
E HKC Safety Evaluation Report (5ER). suppls b correspondence
8007070109 Informs that, as stated in Buppl 4 to SES, manual ECC8
•uitchover approved in Suppl 1 to BER lias been
r>--evaluated NRC requires that manual switchover actions be
replaced by automatic design complying u/encl criteria
8CHUENCEH.A tU«nslng Branch 3 80/06/lfi 3pp
800701036:3 FoMiiards Nltf rcur gnn i i a 1 1 nn cJiart for lift u f Nurlear Flcactor
Regulation. Pffettiv-e B004?H f ona ni«rQt ions re activities
should be mode thTouuli assigned] rug t representatives Areas of
d i saflraement may be ciiscu&Eeii through informal .ippoal
L ABeistant Dirc-ctui fin Lit-ensuig BO/0(j/13 Spp
InForm5 tlifi.1 sPtumO inteiin- rept-per Fatilitij 316fb) plan
of atudij, kii 1 1 [IF d i 5 ti i bu ti><! to li'rhniial advieurij group b ij
BO0625 Dulaij caused by campiit-or probleni Buhroittal date
ihouiil allDLj enough timff for levn-iii Lefnte QOOTQy meeting
3HISSAIS,.J A F'ghln Sorvirt- Fluct.ic J, Q.is Co of UEUI Jersey
BO/Oii/13 3pp
8007160416 No-tiFuntiuti a? QUQti^C meeting ur/ittil in Qethes-da- MD to
discti&s NRC position on steam generator- tiflie plunging t.
inatal latior of iri&p (inrt*
Luensing Blanch .1 BO/Oh/ia 2pp
8007020066 Forwards request f cir ,iddl info needed to complete timely
revieu of TMI-H LecSdns Learnpri Tiisfc Porce short-term
items BesponrSB requested «uit(iin 3D days
SCHWENCER.A Licensing lin.nch 3 BO/06/20 5pp
SQ07I1O554 Suinrnary at B00610 meotina u/util in BBthesda.HD re control
rod position indlLfitor 5ys licence amend request Lists
three possible noluttons to ^rnbl^m LJ/ i nd i t atcir ftttendne
list end
KERRIGAN. J Licensing Braiith 3
BOO7H0561 Summa ry n f aoOdnti mcntiiiQ u/util !< Wos ting h ause in
Kethesda. Ml) re profloso-d ton-c eptus 1 dpsign of flutomfllic
ECC6 su)itcln3vi)r ays List of atttndots I, rnepting handout
K.ERH1QAN, J Licensing Branch 3 BO/Q6/24
lipp
B007230001 Foruiards "Hatement of pal ] t ij i i> i-pquirameiits to be met for
current OL applications, js dorivt'il fi orn MUHEG-Q660 !. foi>nfl
tn NUnEO-0694
EISENHUTi D C Dlvismri of Licensing BO/0&/2A 3yp
600703O249 Foruiaids response to BOOflOl confji mfttory order! re loea nf
non-Class IE instrurapntat i iin l< control p QUIET bus InFo
written POT Unit libut also Sipplnable for Utiit Breuci-pt ai
noted Includes response t& IE Circular 7*-0? Affidavit anel
9CHNE1DER-F H Publlr Service Electric t< Gas Co of N«ui Jor-sDi|
BO/06/27 3Spp
F, Bffcurityi medicgl. omergency !. firo protection plans
BOO70B006B Fopuiardn Bubmittal 4 to D00627 security contingency plan.
flubnitUl withheld (ref 10CFR3 79O>
HBRII21.F F> Public Service Fine trie !. Gas Co of Neu Jerseu
eo/oi/ao ip
6007210377 Notification of B007OI meeting u/util in Dotheada.MD to
dlicun emergency preoparednese
Oporating Reactors Branch 3 BO/07/O1 3pp
80D707O110 Bu-bmitd pl<in to rerlai. e Inng-tL-rm contractor personnel
committed staff of licensee emp liiijoos , i n acccrdflitce u/Item
7 4(4) Of Tocl) Specs t, t nmmi tmtint to NHC Licensep Pipect-s
to start clan on 000BO1 ScheduJe h graph Bn.cl
LIDRIZZI.F P Public Btrvure Electric t- Cos C,a at NBU Jersey
BO/Oi/a? flpp
BO0707Oa05 Foruiards responses, to full pinuur litcnsi? 1 pitui pame
identified at NRC BOO617 mueting
M1TTI,,R L Public Service i:ietti-ic '. Qii-a Co of Ulna Jersoy
BO/01,/27 14pp
B007140439 Requests approval to proceed u/interlm USB of training
Facility in QuintoniNJ at ncarsite emergency operations
facility
SCHNEIDER, F U Public Service Elcctni t. Oas Co of Neu Jm-aev
HO/07/03 4pp
— B007Q70HB? TflCh B|)Pc Pages t)/rt V»p tlvriuigli 7-7 fur auilllaru Pec
ays & nimllarij feed stm .iqt? tank H^Jiitnl dacumentati on
encl
» Public Service b'lortrii fi Qas Cn of New JCTOPIJ BO/Od/H7
Bpp
0 Adjudicator^ carrespandence
B007310243 Forwards CommiBsion 8Q0527 memorandum ^ order containing
dtcislons on UC8 7fl030B petition for reconsideration of
7&0413 memorandum S< order UCS 771104 petition sought action
re fire protection for electrical cables
E1BENHUT.D G Division of Licensing B0/0i/a9 B9pp
J In*urancB & indemnity information
S0070103a3 Foruiartts Endorsement 39 to AN! Policy NF-330
CORREA.H A Harsh t, McLennan. Inc . M !. H Nuclear Consultants, Inc
Dlv BO/06/23 Spp
B(K)73 10343 Foruiard* Endornement 33 to MAELU Policy MF-90
CORREAiM A Mflfih t< McLennan. Inc . M & M Nuclear- Consultants,!^
Otv BO/07/E1 Spf
B007310376 Foruiard* Endorssment 40 to ANSI Policy NF-230
CORREA,M A Mar«h I< HcLennan, Inc . M *< M Kuclear Consul tantu Inc
Blv BO/07/21 Spp
SO070301tl Forwards aild 1 inlu in respr-nsp to NUC H00618 fe^uifB
auxiliary feudujtfrr t,ij3 AL-I 1 1 t ,iry f eoiluiiter SLJE For bath
units are idnnticnl In dos ign. i nc 1 ud »ng Duuinment &
automatic initiation logic
MITTL.R I Public Service Ll&rlric d Oas Co of He LI Jor-ainj
BO/07/01 13pp
Foriuards addl Info IB full pouiur liceiiao requirpments
identified at BOOM? meeting Info supplements 900627 1 Ir
MITTL.R L PublU Ssrvirc Electric !< QH£ Co of New Jersey
90/07/01 6Spp
BO0703024fl Forwards response to £100620 ruquosl fol' Addl info re TH1
Lessons learned rtiquircfnentt
MITTLrH L Pulilit Service Electric t. fidn Co of Neu Jersey
80071^.0628 Foruarjs tett protndurt- SUP B't 1 , Ap p. <3, "FeeduatBT- Hammer
Teal." for review i. approval Prnrpdurt provided per
requirement in Tech Spec 1 3
MITTL.R I. PuUif. BerviC-B Elt-ttrac F, Oas Cn of Now Jarseu
BO/07/O7 Ip
128
DOCKETED ITEMS
— B0071&O1333 Tn-st procedure SUP flO 1 'Fcedmatcr- Hammer Test "
* Pub I it Set-vn-p Electr.t !, G.-JL, ft, ti F lieu Jersey 80/O7/07
2p p
BQQ721O365 Forwards revised paiji.' tu E)0(J!Q2 lessons learned
implementation submittal Add 1 info inflects discussion at
500408 meeting u/NHC
LinnlZZI.F P Public SurvitP FU'ttrir & lias Co of Usu Jersey
BO/07/OB Sflpp
000733061* [listu&Bes required (<erf ormanc* of augnontcd low poucr
Startup test program Ne.ji-tpim El. app 1 1 csnts aliould pur form
teats •simitar to lasts proposed by TIM prior to eic-neding
5X of rated tJiernjl pauer
E1SENKUT.D O Division of Lit simc i ng BQ/07/11 2pp
BQ0724QOBI Rnn.u&i,r6 thai end list of info. re possibility that long-
term uatc-r -snurti; for auiiliarij FL'Edmnter cys maij contain
salt-be provided tn complete fill I -power requirements
SCHWENCEH.A Licensing Brrfnth ^ SO/O7/1 1 3pp
6007350006 NotiPiration of QQ07E3 meeting u/utlls In Getti e sda. MD to
discuss raaltoi-5 re TH1-2 dated requirements
DRDMFR1CK.A II Licensing Branch 1 KERRIGAN, J & , STABLE, C H
Licensing Branch 2 30/07/li 6pp
8007Pe0113 FlEq.ueGt'3 thdt BOO337 raqiiebt tn amend License DPR -70 apply
to License DPR-75 Requests aullian iat ion to lower Individual
coll mln voltages on iBl> tJ SB vnlt batteries to 2 13 volts
Datterij manufacturer H00d27 Itr •< fee ent 1
L1EU1ZZI.F P Public Serviic Cleittle I: Gas Co of New JEIBBIJ
BD/07/Ji 4^p
— 3007280143 PropiiE-Bd change to Tech Spei Pages 3/4 B-ll t, II re
aurvei 1 1 antt rei(iiiri>itii>nt'i I or eleitricn! ptiiucr sys at Unit
2-
»• Public Service Electric !• Qiis t,o of Hoy Jerseu, QO/07/16
3pp
000731031*7 Forward 3 pi u posed contcptual -design For automatic suitchover
of ECCB from injection phase tn r ec >rt u I aticn phnse of
operation Final design patltage mill lie submitted for HUC
re-viHu >i approval bij SOO9O1
MITTL.R L Public Service Eluetric. !. Oas Co nf New Jersey
BO/07^17 23pp
000721030^ Sutmi ti tjddl info re [ on to mm writ tump mud-cl test program
Objective is to confirm existing sump dueign or. If
improvements are indicated, to develnfl suitable mnils Checli
testing df finai design Will b< perfprmed
MITTL.ft L Public Seivice ElPttric A Oas Co of Hou Jorsey
BO/07/17 3pp
6007310160 Fnruarils request for >i.ddl inpp ro effects of debris On
eontai "imajfi t emergency «ump perFormnnc v undDi- po^t-LOCA
conilitionB Cnncciot rtlatecl to cdiit.iininBiit sump hydraulit
performance liavp been ijctoptnblij rctolvad
BCHWEMCER.ft Licensing Drarx h 3 80/07/EI 7jip
BO07170M3 rt^sponfls tci IE Bulletin 80-10. "Cnntaminat i pn of
Nonrao i oac 1 1 VB Sy& ft Resulting Potential ^or l/nmoni torc-d.
UncontT-nllei! Rujease of RaoHoac tiui ty to Environ "
Requirements 1 !< H mere complete!] on 000612
BCHHEIDER.F W Public SErvkcu Electric !. Oas Co Qf Ney J»i-»»u.
00/06,^13 Ip
BO0702O£.a3 Fc-riiiardE IE Bulletin 3O-15, "Posaible LOSE of Em»ra»ncu
NotiPiCatlon Sys (EN3) W/Loaa uf Offsite Pouter •' Hi itten
rc-gpansD required
ORIKR. 0 H Region 1, Philadelphia, OfPtco of the Director
60/Ot/ia Lp
0007020519 Forwarda IE Cirtular OD-15. "Loss of Reactor Coolant Pump
Canling ti Natural Circulation Cool down " MD uritten respensi
H Region 1, Ph i lod elph ia. QfFice of the Director
BQ/0&/30 Ip
BQ0716073& Fnruards IE Cifculflr QO-I4, "fiad i oactiva Contamination of
Plant Dsralrieral t led Water E>iJ6 Ei Resultant Internal
Contamination of Personnel " No written response requirnd
GftlER.II H Region I, Philadelphia. Office of the Dime tor
0 Inspection repnrtBi IE Bulletins
cori-esptindenc e
B007210374 Forwards IE InPo NutiLO BO-Sfl. "Low Level ftadtuaste Burial
Ci-lterla " No lurittosi response required
H Region 1> Phil ad elphiar Office of the Director
IP
B007310-032 Foruards IE Insp Repts SQ-272/BO-11 t, SO-311/BO-07 on
BOOB 01 -31 Ma none omp 1 i ante noted
BRUNNERi E <J ftcglnn lr Ph i lad elphia. Reactor Operations Nuclear
Support Branch BQ/Od/26 2pp
— BOO731005B IE Imp Repts 50-a7S/BO-ll t. 30-31 l/HO-07 on 000301-31 N«j
noncomp 1 lance noted Major arena inspected tours of facilttg>
Ing & record reviews. reviews of licensee ovents &
opei-at i anal taPety verification
«OMHOLM,L J , HlLL.N H Region 1, Philadelphia, Office of th*
Director KEIMIO* R fl Region 1< Ph i Isdol phifli Reactor Operation*
Nuclear Supptirb Dranch 60/06/23 I7pp
8007230173 Forwards IE Bulletin 80-16, "Potential Ml sopp 1 icotion oP
Rose mount Inc Models 1151 !< 11H3 Progsuru Transmittore
H/Eittier A or D Output Codes " Written raeponie roqtilrod
IE Circular SO-li also encl No written response required
CRIEFliB H Region 1, Philadelphia, Office of the Director
HO/Oi/27 Hpp
BOD731060B For war- da responae to IE Bulletin BO-OB Doth units ti*vfl
contQinment boundary butat uieliln All uieldt fabricated to
apction VIII of AS ME boiler b prosture vebsel code
BCHHEIDER, F W Public Service Elacbrlc f< Oaa Co of Neui JerBBij
BO/06/30- 4ff
610073103*9 Poruar-ils final response to confirmatory orders iflsueil
on D00404 in roplij to IE Bulletin 79-27 ro UBS op Nonclasa
IE! ing iruniHntntion t< control payer GIJB bus during operation
Response submitted por util SOQSSi Hr W/nffidavit t. memo,
SCHNEIDER. F H Public Service Electric & Oas Co of Nou Jerieii
80/07/01 3'?pp
80070-30133 FnrujarrlE, IE Info Notice flO-PH. "DrenkJuuina In Contamination
Control Programs " No written response roquired
OniER.D H Region 1, PhUaitBlpii i a, Office of His Director
Ip
0007010-300 ForyardE IE Infu Hotite BO-23. "Loss lif Auction to
Feeduater Pumps " N-o written rrsponHe requii-ed
CRIER. B H Region 1. Philadelphia. Dffice of the Dlvoctrtr
80/OS/S9 Ip
B007H10ilO Foriunrils IE Infn Unties BO-36, "Evalifation nf Contractor
Qrt t'ro jr-ams " No urritten rcspnnse rctiuired
(tlilER.D H Region 1, Ph i lailelf h i a, nffico of tho Dii-in.tor
aO/06/10 Ip
b2 Foruiards IE info Nptite 80-P7. "Dcgradatlor, of Reactor
Coolant Pump Studs " No tpetific action or responsfl
renuired
BRIER. B H Reuion t. Philadelphia, flpfice of the Dir-ectnr
Ip
8007)70570 Res.pDnns to IE Bulletin 80-Ofa. "Er.gitiei.red Safety Feature
<ESF) Rflret Contnila " DsscTibes instances discovered in
fire protecHun. FecdiiTdlei !. stnnm line isolations DBiigti
changes scheduled
BCHNElDEfl.F W Pl.hlic SnrviCE Electric, t. «as Cn of New JefBeii
fl-0/06/13 6pp
Returns dncumentB re Item 10 of IE Insp Rept SO-311/7B-51 on
noBsitlB sensitj intlon of safety injection pump piping U/o
ancl
CAflLBQN, R,T Region 1, Ph I lad Elph ia. Reactor Construction b
Engineering Support Branch aO/07/01 Ip
ft ReportablG occurronc HS. LERi t< related correspondence
B007170437 FaruiBriJs LEFt SO-O04/O3L-O
LllilllZIIjF i* Public Service Electric d OSB Co nf New Joney
BO/07/10 3pp
~B007170flfla LEU QO-OO4/O3L-0 on HOOMO, dut'ing routine survsll IOTICB. both
nafetij injectioii pumps mere made operable at leas than 313 F
in RGB Caused by lack oF procedure to limit max number of
opbrahla safety pumat
KURPHY.M J Public Servlca Electric t< Oas Co of NBUJ Jursaij,
GO/07/ 10 Jp
G007230634 ForuarJt LEO aO-005/O3L-0
LIDRIZZ1.F P Public Service Electric t, Oai Co of Neu Jirsey
3pp
129
-B0072BObaa LEU BO-OOS/O3L-O on 800622, during preparation for heatup.
position indication fc mechanical operation of preasuriier
overpressure protection valves gave false indication fe
failed to reseat Possibly caused by foreign matl in volvo
HURPHV.M J Public Service Clfctric It Gas Co of Ncui Jersey
SO/O7/21 lp
Operatino 1 icensi' stage d
Forwards 1.CI1 80~OO(,/03L-0
iF P Public Service Elect
00/07/23 lp
!< Gas CD of Neu Jersey
-0007270711 UER BO-O06/03L-O on SOCM>5*5, res idual heat removal pump uias
discovered to have been previously improperly assambleO
Caused by either personnel ei ror or procedural inadequacy
Pump inspected, repaired & re.issamb led
MURPHY, M J Public Service Electric t. Gas Co of New Jarsoy
HO/07/23 2pp
DOCKET BO-312 RANCHQ SECD NUCLLAR GENERATING BTAriOtl
F Security, medical, emergency & fire protection plans
OO0783OO95 Requests participation in study of poop 1 e-related pr
in nuclear safeguards Study involves collection of data on
license* security forces !< practices NRC wishes to interview
lecurity mgt personnel at facility
EI5ENHUT.D 0 Division of Licensing BO/07/11 3pp
O. Ad] judicotory correspondence
8007240208 Forujarife OM» lictn^up
reviBiu of schedule for instnll
reactai triji fur Inss of f^ppilu
should be completed by 771115
A Tlll-3 Bulletin-, '< Orders
esponse? to 79O<J07 request fnr
taf pty-pt adp anticipatory
S< tin Bine trip Review
8007230O99 RBo.ue*.ts ButimittaJ of protir.seJ TPCh Spec chanaes providing
far redundancy in flu-ray lieat removal c ,ip,-ih 1 1 1 ty tn .ill modes
oP opet-ation nude I Inch Sprcs uh 1 1 h uould prnviiln utcijptanle
roaolution encl fni guidsnri
E.IBENHUT. D Q Division of Li ruining BO /Ob/ 11 62pp
OOa?O10b?5 DiscuEaei Ucei.sct cuns i ilei J tiuti of intre.isud onsite
raduastc stuvafle nenui.'gt& n-wieus fur orisite aliiriiiie
aaditinns in monthly npuiatniq rept-i Druft 1 Iteiis, my
position IB onsite stnrage tafi'tiji cons literati uns enc.1
RE1D.R W Operotitig Reactors nraneli 4 EtO/OA/1.'1 llpp
B007100203 Applitiitinn to amend License DPR-'JI tiy UIL nrporat ing
proponed Amend AB Fo^ Tech "Spues ba«»d on fire protection
STB Forwards proposed Aiicnd 6B tri Tpih Specs. Bee 1 1 r-iiH 3 14
b 4 113
MtVTTIMnE.J J Sfliramento Monmpul lltiiity District QO/06/1?
— aOO710O20fc Proposed Amenil hU to Totti E.|,i'c:
on fire protuctiQti s-ts
# Sacramentu Mimiiipcil Utility District
pction* 3 14 !, 1 IB, based
BQJQttfll Upp
H0070HOE43 Forwards 800tl9 1 tr to FriendE of the Earth foruiariling
Director's decision D[)-SQ-S2 In rosponHE to 791021 petition
DENTONrH R Office of Nuclear Reactor Regulation. Director
3pp
B007310343 Forwards Commission BOOS27 memorandum Ji older containing
decisions on UCB 7B0502 petition for reconsideration of
7B0413 momoraiidum (• order DCS 771104 petition sought action
m fire protection for alottrical cables
EIHEUHUT.D 0 Division of Liconsing BO/06/33 S9pp
E0071100D2 Order granting eitension until B007SS for Commission tn
elect to review decision on enforcement action request,
HOVLE.J C
fp
Office of the Sscretary of the Commission BO/07/OB
8007150837 ForuanJn liconseo 600711 proposed findings of fact &
conclusions of Into in Form of initial derision Assumes
AfiLB approval to parties' BOOS30 proposes transcript
corrections per HOOtO1? stipulation Certificate of Svc end
BAXTER,! A Shay. Pittman, Potts !< Troubridge BO/07/11 4pp
— aOO715033i Proposed findings o(> Fnct t> conclusions of lau in fcrm of
initial decision Long-term mods itf/ under tad en addl changes
provide reasonable assurance that plant mill respond safely
to feeiluater transients Eicoptiona must be filed in 10 days
BAKTEH.T A , TRAvIESO-Dl AZ Sacramento Municipal Utility District
BAXTER. T A Shaw, Pittman, Potts ti Trouibridfle 80/07/11 25Bpp
B0073103H9 Retiuesta filing datu be revised from BQ0801 to 01 to allow
opportunity to mails changes in findings
LANPHER.L C California. State of LANPHER. L C Hill Christopher It
Phillips BO/07/2S 2pp
H General correspondence
BO07170667 Forwards questions re fut)] mcemblij tioldduun spring failures
first obBBTvod rft Davis-OeG!.e 1 & under invest Hat ion hi)
D&W Results of holridouin Kpriny inspB at facility as well as
safety significance required uittiin AO days
NOVAK, T M Assiitant Directflr fm Operating Reactors 80/07/01
S0072100O4 forwards quontinni. rp fnul .iSbembly hnlddnun sprinr) itispi (.
safety signif nance uf o pi era ting u/ broken Eprings m core
Remuoits rcBpoiisp within 1>O days
NOVAKiT M Assittarvt Dit-eitor fcif Dpp-iatirig Reactors HO/O//01
4pp
BOO7240344 RequaGts renporiBB tu me] uueotinn* ri> fufl aescmblij
fiolddfiun ftprinB failufea NRC is interested in results nf
holddoun apt iny insps at facility Ei <>afettj sigiufmance uf
operating uj/lrnfcen &pnng-. in lor-a
NOVAHi T M AtGistant Director for Ope. atirig RaocLors 80/07/O1
Spp
B00735O001 RcijUHFits nubmittnl of aftp 1 i rot i on for nmend to license
Consisting of Tech Spec change', !< liuense conditions PWR
Hodel Tech Spers !. Model lirense conflitions for TMI-2
Uessnns Learneil t.itegonj A items encl for quid.inie
eiSENHUT.D C Division nf Lirensina 00/07/03 fc9p p
Q0070BOiaa Des-ponda tn NF1C 7BQ1S1 It' requesting ,1 1 1 PUR licensees to
evaluate LOCA loads BAW-1597 t. UAW-lAdl submitted H00ai4 !.
0701^rospcc tivelyi dEmonstr rit-e <ibi)itg of facility tp
mainlain corp lueldbility in event of asymmetric LOCA
MATTlMOE,.f J ^icramenLo Niinit.iii.il Utility Distrirt SO/O7/03 lp
0007230432 rtppliuitlon for Ami! nit t>7 Ld Luenoe DFR-3-1 clarifying Tecli
Specs re plant prgnn i iat i rn chnrt b '.urvei 11 ant F
retiuirement B uhen roaLtnr i \. iritirtil
MATTIHOE.J J Sarramantu Mi'ninjol Utility Distncl 00/O7/09
Bpp
B007290S36 ResponnH to 79O105 1 tr re nuclear power NutlBar plants
generated 13X. of elertrical energy in 197? Rancho BBCO can
resume operation uJheti mods are completed Excerpts re QAi
radiobiolooicol haiarda of PIJ (. environ effec-ts end
BENTON.H R Office of Nuclear Reactor Regulation. Director
SO/O6/27 2ipp
— B007290SS3 RequHste Info re percentage of electricity produced by
nuclear plants, whether Rdncho 9nco ui 1 1 be closed damn &
CBSes where fuel rods or valves uiere found faulty
UPTDM, R T Affiliation Unknown 79/04/OS 3pp
0007300370 Advises of chanfle of nddrsss from 520 Capital Mall, Suite
VOO to 45S Capital Mall. Suite 31,5 Related eorreapondence
MURBH.O aacramsnto Municipal Utility District BO/07/05 lp
— B0073304fl3 RBVIKOI! Tuch Bfft b Pflye 4-1 !, Figure i, (>-2 clarifying plant
organuution ch.irt & aur vel I lance r oquii erren Ls when reactor
is critical
» Bacvamrnto Municipal U-tilitij Dtitncl ao/{)7/0<; app
B007230fc51 Pr-ovtdi-'B info ri- ueui ofr 1 1 tlem r>osi tlnne t. assignments of
personnel resulting From COllflSfl r uorgiiiiiintiftn of npc of
NuclBar Reactor Reaulfltion
NOVAK, T H Assistant Cirfrttor ftn Hperalinfl Hertrtors BO/07/10
Spp
8007240123 Submit: udill infc- to tomplnte retponsc to 791119 inquest for
addl info re cnnt.-tir.menl purge & vent *yt
WAI-BRJDOE,W C Salramanto Munlcioal Utility. Oistritt BO/07/11
8007290^23 ReciUBfcti roi ret ponll cur B betuioi'n NBC ti util m seismic
investigation Reiiuest^ meetiiig uiJulii in CA to rev! BUI
progress of studies !< preipul i'i|n-rlj so in re\iciimi(j
seismic data
DAVIfi.JF California. Stnte (if EJO/07/ll )p
130
DOCKETED ITEMS
B007ESQJ43 Forwards licpnsse HQ0721 1 ti ro 5afetij grade anticipator^
reactor trip S\.c li?t encl
BAXTER, T ft S(iau. Pittman, Pntts J. rieiubndge BO/07/23 Spp
Notifies that equipment being added to leaetor protection
sij5 cabinet^ is of sufficient mass as to require neu setaraii.
analysis. of ratinets Analysis, requires aparai SO uts info
mill be provided in tine to allow for final design approval
WflLDRlD&r.,U C bacramento Municipal Utility District BO/07/31
Ip
B0070204SO Forwards IE Circular BO-15, "Loss of Reactor Coolant Pumn
Cooling ft Natural Circulation Cooldoun " No written response
required
ENGELKEN.FI H Region 5, San Francisco, Office of the Director
HO/06./2O Ip
BOO71S0393 Forwards IE Circular 00-14, "Radioactive Contamination of
Plant Demlnpral iied Water Sys t, Resultant internal
Contamination nf Personnel " No written response required
ENGE(_«EN, R H Region 5, San Francisco. Office (if the Director
80/06/24 1 p
B00724019B Responds to IE Bulletin BO-OS. "Lass oP Charcoal from Tijpe
IK Tun-Inch, Ti ,iy ftilsurLBT Cell* " Const of trays does not
utiliiB r:vett for securing perforated screen to casing
Screen is spot uelded at apprpj one-inch intervals
HATT1MQE. J J Sacramento Municipal Utility District SO/O3/Q&
Spp
DO07250370 Forumrrfs response to IE Bulletin /9-37. "tosn of Non-Class
IE Iiistrirmentfl 1 1 on ', Cnntrril Power Sys Ous During
Operation ' Describes pouier upset evcrd* on NNI/1CS Suffer
to.rd installations, mil be checked
HALHfUDGE, U f Sacr-ircento Huinnpal Utilitu District 30/03/12
1-Bpji
8007100541 Respond* ra IE Bulletin 79-17, fievi si on 1, "Pipe Cracks in
Stagnant Derated Water Bys .it PUtt Plants " Three recordablB
ind i cations noted in tuo uelds determined to be gennetric
rPf le-t tioni caused bij ue 1 d i out configuration
HATTJMQE.J J Satvananto Municipal Utility flistrirt BO/Q3/30 Ip
u0072401?a Formards response to IE Bulletin 80-04, "flnal^5i5 of PWR
Main Steam Line Break H/Cnntinue-d Foeduater rtddition " Plant
5iJ5 6 atructurpi designed to respond to double ended
guillotine stean tine tires I inside c onta innient
MAITIUCinF.J J Sacr.imentu Municipal Utility District HO/O5/06
2pp
B007G2O340 Foruiarfls IE iTifo Notice BQ-32i "Brealrdouns In Contami nati on
Control Projrdms " Nn tuntlcn rpepcns-e required
ENOELKEN.R H Region 5, San FrsntisCQ: Office of the Director
eo/os/sa i p
B00733D399 Forwards IE Bulletin 00-16. "Potential Misapplication of
RpEemount Inc Modele 1151 ti 1133 Pressuro Tranorattters
H/Elth*r ft OT D Output Codes " Written vegponso required
IE Circular BO- 16 also enc 1 No written respanse required
ENOELKEN,H H Region 5, San Francisco, Office of the Director
SO I Ob/37 Ip
8007310^94 ForuardB IE Insp fiept SO-313/BO-13 on 800509-09 NO
none amp 1 i-snce noted
CREW9.J L Region 5, San Frantisco, Reactor Operations Nuclear
Support DTanch HO/O7/02 2pp
— B0073I03OJ IE Insp Rept 9O-3I3/BO-13 on S0030B-09 NP none Dtnpl ianci
not erf Major areas inspected document control program, ona 1 be
revieia committee op erations. rear tor operator requal i f itation
program d IE Bulletin 79-S7 foUouiip
ZWETIIO, G B Region 3, 8an Francisco, Office of the plrector
FAULKENBERRY-B Region 5, San Francisco, Reactor Operations
Nuclear Support Branch QO/07/Oa 7pp
R Periodic operating reports ft related correapondencB
EIOO71905BB Fortiards monthly operating rept for June 17HO
RO&RIQUEZ.R J Sacramento Municipal Utilitu District SO/07/07
— B0071505^S Monthly operating rept for June 1980
COLDMBO.fi W Sacramento Municipal Utility District
3pp
S HeportatiJ* nccurrencos. LGRs ti related correspondence
PO07BEO(,7£i Responds ID IE Hulletin BO-IS, "Decau Heat Removal B(j s
Dpcrjfc 1 1 i ty " Optrritional assessmc'nt indicates similnr
acciiTronce not likely fit facility bcrause of differences in
ifpcay heat removsl SIJB !• ECCG
J Saciami-ntD Jlunicipal Utility Bittrirt SO/&6/04
8004240296 PNO-V-EO-17 senior reoident inspector infonned that ipncer
grids on five Cycle 3 fuel assemblies damaged during fuel
ratjvemotits Cause of damage due to contact between spacer
grids w/boued fuel & adjacent assemblies during refueling
FAULKEN&ERRY, Q Raoion -3, San Francisco. Office of ttie Dlrectol-
80/03/11 2pp
0007290047 Reapolids to IE DuUfrtin GO-OS Sijs that eauJJ) be valved
directly to prinarY sijs water revipued RCS drain tan*j Plash
tar>l & makeup tank may be subjected to vacuum conditions
Other tanks can withstand conditions ui/n inuard buckling
MATriMDE. J J Sflcramentn Municipal Utility District BD/O6/O9
Spp
3007320350 Forwards IE Info Notice 80-ai. "Evaluation uf Contractor
QA Programs " No urlLten r-eaponae required
ENQELKEN.R H Region 9. San Francisco, Office of tne DlractOT
BO/06/10 Ip
S007310477 ReEpoiidB to IE Bulletin BOO 6 Revieu of electrical drawings
made to insure safe tij-relnteiJ equipment i-Bmaini In Emergency
node upon res-et Tpstina tcmpletcd for all equipment that tan
be tested wNilp ^laiit is ifi operation
WALBRIDGE. H C S.iLrjunffnto Municipal Utility Pistntt BQSQB/IO
Syp
B00703001J Fnrmai'ls IE Dulletin BO-15. "Possible LORE of Emergency.
Notification Byi. (ENS) W/Loss nf Offoits Power " Written
response required
ENGELKEN.fi II Region 5- San f-ranr)Bto. Office of the Director
BO/OA/ifl IP
H0072')0407 Forwards IE Insp Kept 50-3^/30-17 on a0050!-30 Kt>
nonccm|illali-ce notprl
CREWS4 J L Rsgton 5. San Franri-sco. Heactor Operations Nuclosr
Support arantli
--0007310430 IP Insp Kept SU-312/80-J7 on S00301-JO No noncamp 1 lance
noted Majfir area* inspetted followup on items of
noncomp I innc P t< heaitnuartors requ»st5
CANTER. H U REOlon S, Sdfl Ti-anciftco. Office fit the Director
FAULKENBEfiRV. Q Region •), San Frantiato. Redctor Operations
Nuclear Support Branch 8O/Ofa/J7 Bpp
B0070a0370 Fortiat-ds LER BO-030/03L-0
MATTIMOE. J J BacraraBnto Municipal Utility District flO/06/24
Bff
— B0070B0277 LER BO-03O/03L-0 on B00633, uhi le performing I-IOSC. reac tor
protection sys channel C test, overpouier bistable voltage
setting uas found drifted out of spec Caused by
malfunctioning of semiconductor voltage regulator
COLOMPO. R W Satramento Municipal Utility Pistrict SO/OA/2A
IP
BOO'7230laS PNO-V-BO-057 on B00707, 1 icnnsee reported that two direct
radiation monitors on perimeter fence of restricted area
uhotued results above reporting level of Toch Specs High
values may be result of uaste storage
FISH'R Itegion 5, San Francisco, Office of the Director BO/07/10
B0075301B4 PN3-V-BO-Q06 on 000603. employee denied access to Vital »!•••«
because of personnel -related {natter On 800604 employee again
denied access to site because of behavior
SCHUSTER. M D , NOR DERHAUG. 1- R Region S, San Francisco. Office at
the Director 0O/O7/ 1 1 Bpp
B0073J041O Fc.
MATTJMDE. J
ds LER 80-031/O3L-O
Sacramento Municipal Utility District
— B&073101IB LER 00-03 1 /O3L-O on BOO703, dur infl roviolu op IE Bulletin
7?-14 uior*. Found itreifl analysis for nonconforming pipe
support uas overlooked Caused hy design documentation b
const drauings not conforming to seismic analysis
COLOMBO, R U Sacramento Municipal Utility District BO/O7/16
131
DOCKET 50-313 ARKANSAS NUCLEAR ONE, UNIT I
F Security, medical, emergency t< tire protection plans
BDO7OlO3t9 Forwards "Rept on Wall Penetration Fire Stops" fc "Fire Test
Criteria tor Penetration Goals in Concrete Floors (. Malls "
TfllMBLE. D C Arkansas Power & Light Co BO/06/11? lp
— HOOTCH O373 "Repl on Wall Penetration Fire Stops "
* Underuiri ters Laboratory 00/04/30 HSpp
BO0734O30B Fornjands DMJ licenser;' rssponses to 790TO/ request for
rcvieiu of schedule for installing saf eti;-grad e ,mt 1 1 1 patory
rr-flctnr trip for lose of ftedtjatL'r fc turbine trip Flpvieui
should be completed *y 7V 11 IS
CAPRA.R A TM1-? Bulletin' I, Orders 79/1G/34 lp
BQ0703021Q Responds to MRC B00101 requost For inffo re
of once through steam generator auiiliarg- f -a p-duiater
collar welds Probati 1* cause- !< Failuie mode of- me 1 d t
not ijet determined
TRIMBLE. D C Arkansas Power '< Light Co BQ/06/O3-
potential failure
sleeve/
racking
3pp
— BQQ7O1O3BO "Fire Test Criteria for Penetration Seals In Concrete Floors
t Malls " Fcur Illegible drawings encl
> Arkansas Power fc Light Co BO/Od/04 Spp
BOO7Q7O14B Document s NRC telcon tt approval of temporary eiemption to
• lilting emergency plan, Beet ton 4 3 1 1-C requiring
dacontanlnatlon shouier facilities in emergency control c tr
TRIMBLE, D C Arkansas Power t. Light Co SO/Q6/S7 3op
SOO717O2ai Forwards Amend 60 to emergency plan
THIHBLE.D.C Arkansas Power t. Light Co BO/07/11 lp
BO0723OO99 FIcquBsti EUbmittal of c-i oposeil Tech Spec changes providing
for rt'dundaTicij In decay heat lomoval capability in all modes
of operation Model T«ch {Specs which would provide acceptable
re-solut i on Btic I for (uidanro
EIBENHUT, D 0 Division of Licensing BO/O6/H iiBpp
B007O1035.fr Forwards abnormal transipntf- operating guidelines program
outputs Draft guidelines scheduled for iirbmlttal in Aug
195O Copy numtiurs assigned to event tree drawings Requests
controlled copies tic utthhpld Ire* lOCFffa 79O)
TRIMDLEj D C Arkansas PQUJOI- I, Light Co SO/Ofc/lA )ji
— BOO717O2H3 Amend AO to emergencg pl»n consioting of Figure 3rinttial
notification in event of accident
* Arkan«aa Puwor t Light Co 00/07/31 lp
BO0703O371 Forwards request for
MOVAK. T H Assistant Director
3pp
jddl in PC, re uj^ste gas f
For Operating Reactors
BO07S30O73 Notification of 600722 mooting ui/AR Pouier !- Lijht Co in
Btt)i«»da,MD to revlou proposed earlij warning sijs
VIBSIHO.D 8 Opm-atirg KoactDrs Branch 4 BO/07/1A Spp
B Ad jud icalni-y currespondence
flOOT31OB^3 Forwards ComraiBHion BOOS37 memorandum fc orier containing
dlcliians on UCB 780302 petition for reconsideration of
700413 memorandum ft order UCB 7711O4 petition sought action
r» fir» protection for electrical cables
T. D Q Division of Liccnsinn BO/06/25 89pp
-corrQapondance
BOO711O449 Requests responBO to encl R Laceuell Itr re plans to
Increase facility spent fuel storage pond site
BETHONE, E HOUSE of Rep HO/O4/3O 3pp
BO07SS04B9 Application tn amend LlLemses EPH-51 (. NPF-i, delet ing
roquirement for t-esting reactor bldg smolie d-etBttors while
reactors remain critical Suggested iliangB4 to Tech Spct
pages & Class 111 fee encl
CAVUNAUGH.H Arkansas Pouier & Light Co QO/Ob/2A Spf
9007150474 Suggested changes to T
fire deteitlon instrumentation
* ftrkansaa Pouep !< Light Cu
Spec Pages
2pp
3-43 fc llOp re
6007170-319 aumnarij of BOO Si 13 meeting ui/ut
reli^ibilitg evaluation program
DLBHAH.L N Operating Fleactors Branch
in Dethattdiij MD re Interim
BO/Ofo/TO 3pp
8007350186 "Elec trical. InitrumontJi tlon t< Contrnl Aspects of Lou
Temp Overpressure Mitigation SyB.Afi Nuclear One. Unit 1 "
HEDER.D A EOT.O Idahoj Inc TIM A-A256 HOO7a90ieft QO/06/30
16pp
e(>07010OZ4 Submits updated info re admittance of NF1C personnel to
facility RaqUBsta that permanent nonemp lou.ee picture bailg*9
tt site oriintation be provided W/o encl
EEVFRIT^K V Region 4. Dallas, Office of the Director
S00707O293 DffspondD to MRC 000410 1 tr reijue sting that all lic-ensece
amend Teth Bp-ecs so that definition oP term "o|icrable"
would bf consistent u/WRC BTS Revision uill require at least
90 days
TRIMBLE. D C Arkansas Power & Light Co HO/07/01 2pp
SOO7070O2O Rituests that util provide IE headquarters w/microf icho copy
of listed PhlDi
L Region fl. Dallas, Offlco of the Director BO/01,/16
B007090aB7 Foruards small break LP/ fal 1 e* pouor operated relief val
analyslsj In rvspanso to Item 3D oF NUC 790B21 Itr Analysis
Jemona-tra tea tliat present operator guidelines are -adequate
to mitigate consequences o* waJvp Failure
TRIMBLE, D C Ar*ansas Pouer (. Light Cp SO/07/01 14pp
BOO7S9OO7O Respond i to end BO0504 Itr to President Carter re nuclear
• nirgij Use of both coal t nuclear pouier necessary to free U3
of overdepenilencB on foreion oil President Carter 791H07
priBC T*lea»B t, energy plan oncl
DENTOHiHR Office of Nuclear Reactor negulation. Director
SO/ 06/27 52pp
BOO71O014S Requests removal of TD Conner from list of correspondence
Ti-clpients fc addition of N Reynolds Licensee has changed
legal representation
TRIMBLE. D C. Arkan&as Power t. Light Co 80/07/03 lp
BOO73IO33I Responds to 800425 Ur re B00910 event at Unit 1 Forwarfis
LED SO-013/Ol-Q d IE Insp flepta 3O-113/BO-O7 i SO-34B/BO-07
DI»tuB«es treatment of spilled water !i radioactive content
of uafcer M/o encl
BEYFRITrK y Region 4. Dallas, Office of the Director QO/07/1&
Spp
80071801)27 Inforfna that uttl is interestefl In par-tic ipat ing in NFtC
research program for interim reliability evaluation program,
discussed in BOOAIS meeting
TRIMBLE.D C ftrkfinsas Pnuier I, Liaht Co 80/07/01 3pp
B0072100-01 Forward a questions re fuel jssBEmbly nnldiiouin sprinu tnspa
iflfety significance of operating lu/bioken springs in core
Bequests reaponce urlthln 60 dngs
j T tt Assistant Director for Operating DBaetoi-s BO/O7/01
B0072105B9 Foruardc quest iont r-o fuol tiaicnbly holddnuin spring
failures NRC i& interested iri knouilng re-suits at inbps !*
»aPetij eignif 1 idnc i? of opera tins u/bTahen eprings In core
Requests response within 60 daye of Itr receipt
NOVAK. T M Asiist.int Director for Operating Reoc tnrs BO/O7/OI
P Operating license stage documents fc correspondence
BO0624O237 Responils to technical assistance request for proposed Tech
fip*e irh*ng*s for OtAt operating plants ForiusrdB requiTom«nt«
tor add I info
ISRAEL, B.U TM1-2 Bulletins b Orders 79/OS/27 !3pp
Q0073300C5J Requests submittal oF sppl icatinn Fur amend to license
consisting of Tech Spec changes & liiente renditions PHIi
Modal Tetli Spec* & Model li tense cnnditiona for TMI-2
LB»«ona Learned CatoooTi) A 1 tern? pni I For guidance
EISENHUT.D Q Division of Liceniinn 30/07/0-3 A9pp
8007210023 Requests info TP 800631 lasi of opfslto power transient at
Unit 1 Info inttudos description af suii tchunrd op-srationi
protBB^ computer printouts of al-anns during transient t<
• trip charts for nrimar-i; ti tetonilarg 9ijs
NOVAK. T M Assistant Dii-actoi fur Operating Reactors flO/07/OB
Spp
132
DOCKETED ITEMS
S00713O394 Advi ses of cont i nueii c omp 1 1 arice u/cuvrent regulations re
hydrogen production from clad-uiatei reaction after
Ingtfll latio-n of liC'i vents per NUREO-O97H Procedural
guidelines will be submitted 310101
TRIMBLE. D C flikansas Punier t< Light Co BO/O7/IQ 2pp
8007260350 Advises of personnel changes resulting Piom reorgan i latlon
of OFc of Nuclear Realtor Regulation
NOVAK, TM Assistant Director for Licencing BO/07/10 2pp
8007300353 Notice of violation fvom innp on 000537-30
• Region 4, Dallas, Rgactn-r Operations Nuclear Support Branch
BO/ 06/11 Ip
HOO7ao035fl IE Insp Rents 90-313/BO-09 & 50-3ba/aO-0? on BOO337-30
H-oncampl iante noted failure to adhere to procedures for
handling temporary mods to jumpers t< bgpnsaen
YANDELLjL A , HEBTERMAN. T F ReBinn 4, Dallas, Qffico Of t*»
Director HQ/Oi/11 9pp
Rei teratea util position ie need for addl ine tnimentatmo
for detection of inadequate tare coaling No addl
instrumentation 15 needed Uti 1 SOO131 Itr surraaar i <ed
position Ho responses received to date
THIMBLE. D C Arkansas Power !. Light Co 80/07/11 2-pp
0007070175 Ack receipt of 8OO&39 Itr informing MRr of stops taken to
correct violations nnted in IE limp Ropts 90-313/BO-OA
t. 5O-36B/SO-06
HADfiENrO L R&ginn 4. Dallas, Reactor Operations Nuclear Support
Branch H 0/06/1 7 tp
aaO724Hl20 Discti^e;. NRC PDOili. Itr ie reactor vessel surveillance
program Questions i!BceiSil<j for Immediate change Of Tech
Spec 420 Current: procedure is adequate to maintain reactor
vessel matl surve-l I lane e program
TRIMBLE, D C /ukansss Pouor ?i Light Co BO/07/lt ip
S00727Q040 Resnondi So memo Te fuel ajjustment clause provision that
mould permit p.isung 90/- of cast of rcplacoment pouEr an to
rate-pagers NRG would present any infn at formal hearing No
investigation planntiJ
VDEOELl.n J Office a F th-e E.ecutwe L&gal niroctor BO/07/IB
BOO7230P44 Foruiarii IE Invnsti gation Ropts SO-313/BO-OB & 50-36 B/BO- OB
on 800510-13 No noncompl ianco noted
BRDUNiQ D Region 4. Dallas, Fuel Facility & Mjatorialft BaFetiJ
Branch BO/OA/2O 2p p
— 8007230257 It Investigation nopta 90-313/BO-OB & 50-3(.B/HO-O3 an
B00310-12 No nont amp 1 i an-c f noted Mejor areas inspectod
radiological conditions & environ impact associated ui/rnaln
coolant pump seal failure
BROWN, C D ftngion 1, Dallas, Fual Facility & Materials S«fvtv
Uranch WltBDnW, L Region 4. Dallas, Office of the Director
aO/Oi/19 3pp
B Iniiaection reparts, IE Bulletins !« correspondence
B007O20191 Responds to IE Bulletin 80-04, "Analysis of PWR Main Stp.im
Line Break ti/Continued Focdujater Addition " Sufficient
tine mould eiist (Foi operator to isolate affected cnce-
through staam generator in event of ovc rpressuri lat 1 on
TRIMBLE, D C Arkanias- Power ;. Light CD BOyo5/37 3pp
B007020269 Foruarda IE Info Motlcp BO-33. "Brflakdouns In Contamination
Control Programs " No written response required
SEYFR]T,H V ReglOTi 1, Dallas, Dffic* of the Director 60/03/39
15
B00721034E Forwards IE Circular 00-13. "Grin -Strap narljge in
Wc-s t ingfiouse Fuel Assemblies " tlo written reirponse required
BEVFHIT.K V Hsgion 4. Dallas. OffUo of the Director BOX05/2Q
Ip
8007010040 FaruardE IE Info Notice BO-23, "Loss of Suction to Emerouncij
Feeduater Pu^ips " Wo untten reiponse rnquirsJ
SEYFFUT.H V FJecion 1. Dallas, Office of tlir Dirnctor 60/03/29
8(107340031 Foruardi IE Circular BO- 15, "Loss of Reactor Coalant Pump
Cooling 4 Natural Cire ulat iun Cooldoiun " No uiritttn vnaponio
raquired
SEVFRlTj K V Region 4, Dallas, Office of the Director
BQO7Sat)49S Notifies that me mo f re procedure for rotontion tc part oTjnanc
op safety evaluation -Si notics af violation for ilnf Ic iBTic t In
IE Insp Rept SO-313/BO-OS, has been Foruarded to Lircnsinfl
Section personnel involved in design change package revtous
THIHQLE.D C Arkansas Pomer (, Light Co BO/07/11 Ip
BG07300330 Ac k receipt tit EODf,37 Itr informing NHC of steps tafcan to
correct violation notad in IE Inop ftcptB SO-313/BO--O7 b
30-360/90-07
HADREH. 3 L Region 4, Dallas. Kenctor Operations Nuclear -Support
Drancn QO/07/23 la
— S0073D0325 RasponiiB to NRC &00605 Itr re violation not«d in IE Insp
Ropts 50-31.1/80-07 b 50-368/00-07 Corroctive actinn*
junction box cover replaced tt door on end closed
TRlHuLE.D C Arkansas Power * Light Co BO/Q4/27 2np
BOO-7HS0177 F-oTuiards IE Insp Repti 50-313/BO-07 ^ 30-3dS/BO~07 on
800432-0521 & notice of violation
MADSEN.G L Region 4. Dallas, lieattor Coiistfuctl on & Engineering
Support Branch BO/Od/OS 2pp
B00730O3H9 Ack receipt of H00702 Itr Informing NRC Dp steps taken tp
correct violation n&tad in IE Insp flopts BO-313/BO-O9 b
30-368/00-09
MABS-EHi G L Rogion 4, Dallaai Reactor Operations Nuclear Support
Branch. BO/07/22 Ip
--BOO7S3Q1S5 Notice op violation frum in op on 000422-0921
• Region 4, Dallas, Office of the Director 6(1/06/04 Ip
— B007230197 IE Jnsp Repts 50-31 3/BO-O/ & BO-36B/GO-07 on 800432-0331
Noncompl i once noted incomplete written procedures,
insufficient adherence to procedures & pour housekoep ing
measures
ME3TERMAN, T F , JOHNSON, W D , C ALL AH AN. L J Raoion 4, Dalian,
Office of the Direet&r BO/Oi/04 IBpp
90070 2 020 1 Responds to IE Dulletin BO -05, "Vacuum Condition Rejirlting
in Damage to Chemical Vol Control Stfa (CVCB) Holilup Tnnlu "
Only UniJ I reactor toolant make-up tank (, Unit S vol
control tank could contain apprec lalil e amount 3 of hydrogen
TR1MQLE.D C Arkansas Pouer i. Light Co BO/06/10 Sop
— 8007300335 Rotnntids to NRC B0061E Itr re violation notnd in IE Imp
Roptu 30~3ia/BO~09 t, &O-S6B/BO-09 Corrective actions . ontr i em
in jumper !i byposa 109 uiers clBared Coinpletei] pages of log
umra Foruiarded to Flips
pD C Ark ana on Power & Light Co 80/O7/O2 2pp.
R, Periodic operating report* !i related correspondence
8OO7aiOflSO (lept on radioactive effluent releaso. Jan-June 197B,
• Ark BTTS a B Power t< Light Cti 70/03/31 lopp
aoO7010470 Forwards torrected page for monthly operating rept lor
ttBQ
C Arkannas Pnuier (, Light Co SO/Ofi/SS Ip,
8007320094 Forward* IE Info Notice 60-36. "Evaluation of Contractor
QA Programs " No written respontB requiretf
BCVFRIT.K V Regicin 4, Dallas. Office of the Director QO/Oi/10
B007l*i0321 ForojardB IE Info Not it* BO-S7, "Oegrodflt ion of Biaetov
Coolant Pump Studs " No spectfit action nr rospon.se
required
BEVFRIT.K V Reg leu 4, Dallas, fltfire op the DirectoT 80/Oh/ll
IP
90O730034? Forwards 1C Insp Repta SO -111 3 /HO -09 t< 5Q-36B/OO-09 on
800827-30 *. -notice of uiolatlon
MAD3ENiS L Regln-n 4, Dallas, Reactor Uoerationt Nutlcar Bupnort
•Branch BO/O6/I3 Spp
— BO 070 10-1 BO Corrected page to monthly operating rept for Man J99O
BRAHLETT. L 0 Arkansas Pouer d Light Co 80/O4/13 tp
SOO7I00143 Forwards reaults of impingement monitoring at intake during
hay 198O, submitted In accardanco U/ET5 4 1.2 aO> Sot of
•computer ca-rds encl
D C Arltanvas Pouor t, Light Co 60/06/30 14pp
a007aiO-lao Foriuardi monthly opBrfltinft ropt for June 19BO
TRIHuLE,D C Arkansas Pouinr & Light Co BO/O7/1S Ip
— 8007310*33 Monthly opeTatinj rept Por June 19BO
BflAMLETT. L 8 Arkansas Pouier d Light Co BO/07/1B. gpp.
133
S Exportable occurrences. LCRs
? 1 a t el! correspondent
B007L40621 PND-IV-SO-033 on B006S4, all affsite pouier tu both units
loit uh*n tuo lines uere tripped by dispatcher Third line
tiiii out op svc for maint
miMNICUTT, D Region 4, Dallas, Office of the Director
600-7300346 HOs 50-313/BO-22 t> 50-360/30-042 on SOO6H4, events
On 3OO kv punier lines which resulted in 1-osa of all 500 Mv
pDuar lines & reactor trips of both units Cause not stated
Both units ttabla Followup rept mill tie transmitted
G'HANUON.J P Arkansas Pouter & Light CD 80/O6/J6 2op
BOO-7I3OMI Fnriuai'dB LER 00-033/017-0
TflmBLEiD C Arkansas Power (. Light Co
— eOO7!50t30 LER BO-032/01T-0 on 800624, ui/Mayfl oiaer 500 ItV transmission
lint nut vf svc t< unit operating at Pull pouer, 30O kV
Mlbvlvale line trippod Caused bg gi ojnd fault (4 over load
Loci-out relays were reset & 300 kV bus re-anet-gi i ed
SHIVEtV, C N Arkansas Power & Light Co SO/07/07 Spp
BOO7ISOD99 Forward* LEH BO-O1(,/«3L-0
TRIMBLE, D C Arkansas Pnuicr !< Light Co
BO/07/10 Ip
— 9007130603 LER aQ-01A/03L-0 on BOOtl 1 , duv ing hydrogen purge
Burvei llance testing, proper sys flow could not be obtained
Cauitd by rust scale lodged in check valves Check valves
tlvantd & reassembled
BrtAriLETT. L S Arkansas Power f. Light Co GO/07/10 Ip
8QQ71 50530 For
TRIMBLE, D C
ai-rfs updated LEfl SO-01 1/03L-CI
Arkansas Power & Light Co 80/O7/1 1
— BOQ7I5Q-53B Updated LER BO-011/03L-3 on 800401, baaed on piping sgs as-
bull t configuration revi ey per IE Bulletin 7<)~14. 14 hangers
declared inexorable Cau&e not stated Hangers repaired or
modified
DRAHLETT'L B Arkansas Pouor !, Light Co BO/O7/M 3pp
30O731O334 Discusses 800706 routine surveillance test on emergency-
steam driven feeduater pump during uhlcli steam leak
devalopad Re-quests that une of five Pallet! studs be
delivered la Parameters Inc For analyses
KADBEH. 0 L Region 4. Dallas, Reactor Operations Nuclear Support
Brancli &OYO7/15 Spp
HOO7ai040i Fo
TRIM3LE, D C
nrSB LER QO-020/03L-O
Arkansas Pouior & Light Co
BO/O7/16 Ip
— BOO721Q413 LER BO-020/03L--0 on SODiBl. ifur ing makeup pump test, roil indei
ISnlts eicEedad Caused by operator i nadvertentl g opening
inlet to standby demineral i ier (Ml operators reviouied
oeeurrert r
BRAHLETTi L B Arkansas POIUBT & I ighl Co BO/07/li Ip
— SOQ72BO511 LER (JO-OW/03L-O OTI BQtU, if, ilui mi) ri
PiiA could licit IIP stupptd ff-om (iHitrol ruum, Ca
Fire ays preiture resultuig f i un> IvAhiiiy fiic
valve Valve .idjusted
BDAMLETT.U S firluinsa-i Pomri ', liijhit Co BO
DOCKET 5U-315 DDNAI 1) C TODii NUCLEAR HUHEFI f'lMiT.
T Security, madical. emeryeiii.y !' flit pro tci. 1 1 an
•,!>* test, fir
oil by lou
iji relief
t fu
jj/furnut For Hep
ino Rcuitort BO/06/3O
HOO721OOBD roriasrds
plan Format shflulo be- riiViSE'it
Guide 5 54 H/o oncl
NOVAH- T M Asbiitant Dir.ttnv
2pp.
0 AiTjud i catorij t orrespuiidence
SO07310243 ForLrarrts CcjnmiB5i«n 9DD3H/ niEmoftitidum \ order curtaining
duriHions on UCG 7B0502 petition foi rec ons irtpration oF
7BO-113 memorarnlum f order UCS 77) IO4 petition aouglit dttion
re fire protettion fur elertrical c.itilei
0 Division of Lirensing BCl/Oi,/23 89op
H General c orro-spimd-cnce
B00702O177 JlenueBta t onaid*rati on of having Atomic EneTsu Council of
Taiwan visit facility an UQOBO7-G8 Lnuncil inteiested in
observing waste mgt actJvit]E!i Coop era 1 1 on un 1 1 lie major
contribution to (JRC eichangp arrangement
ILrtFLEUn.J D AaEistdnt E-iructor foT 1 n-tcrnatioi],i) CooiiErat inn
BO/OB/ 13 3pp
at.age ifocumpnti. fi c orMiopunfl MICE
8007110590 (\dvise& that Class I t. Ill licensing f ei-s, requestei) in
B00409 HT ro revieu of roqiieit to employ dtver6 tu cut
ntuds in spL-nt pool PUB], have not t>p en roveivcd FJequeats
that fees lie submitteil uithin ID daigii uF receipt of 1 tr
MILLER, W 0 License Fee Hanfl-inmrn t Ur.inrh BO/06/D2 Ip
6007OI05flfi Wotif irstion of HOClVP9~'il niisite meptiiij m/util to ditc
itis&rvite tossing prograjn (for pumpt. t- valves
MINER, a Qfiernting Heactoin N ranch 1 iJD/Ob/O[? 2&pp
H007230099 HequestB •sudraittal of pr«i>oi
for redun^nnrij in Oertiij hpat rDmoval
of operation Model Tech Sppi f- iufi i r h uj
roaolubior, enc 1 for guidance
ElSENHUT.»e Division oF licensing
Tflcti fipi>c changes (•i-o
ab 1 1 1 ly in all modes
d pruuldt ac c ep tatilp
iding
B007OSO591 ForuaritB Tcsponie to. renm-fl i unt prmngi atldl info on
rs-aponse* to NHC -.liort-ti-T m T equli Lmonte for auiflinrg
ffl-Bduater sija
DOLAN, J E Indiana S, Michigan Flectrn Co BO/Oh/ad ^pp
8007340176 Responds to NRC B00601? request fbr into re reactor coolant
pump ifal Failure analysis In progress DvcrsliD drawing
aval title in Central Files onlij
TRIMBLE. D C Arkansas Power tr Ll^ht Co BO/07/16 37pp
B007IBO31S Foruarils LEH QO-Oai/OSL-O
TR1HBLE, D C Arkansas Power t< Light Co
QO/Q7/17
— aOQ7JB03Jfl LER BO-021/03L-0 on 90Q6S4. during reactor trip, steam driven
en-ergencu feeduatcr pump outoma ticnl ly started per design
but tripped an overspeed Cause undetermined Pump proved
opei-ablfl bBFnr* returnlnc, to poiuer
BRAMLETT, L 3 Arkansas Pnuicr & Light Co BO/O7/17 Ip
BOO724D14B Forwards updated LER BO-01S/Q1X-I
TRIMBLE, D C Arkansat Power t, Light Co BO/07/17 Ip
B00711053S Knquiibts d rrteimi nal i un whether uieldrapnti in sa Foty-i p-Sated
tanks FabricateJ hg CJravar Tank naei lipfiign ipecs Replij
rFquvsted utthln SO tlaijs
KDSELEV.N C Division uf Realtor n[nrotioti6 Inspei tioiii BO/06/37
3PP
a007H^0001 Da^uestb Biibrni ttal uF »|ipl n utnin Fnr amend tu license
consisting of Tuch Spet Lhanjci *i licpnse conditions PHH
Model Tecti Specs fc Model liceiiE* tond i tions Fnr TM1-2
I.pa5ons Learnsil Catognry ft i tern a enc 1 fur guidance
E1SENHUT.D G Ulvisian of -LiLcnsLng HO/O7/O2 <.<?pp
800720006") Informs that requested oiemption from Clas.^ 1 Pec
requirement for B003P-1 s,ubmjLtal for ri|>proViil to employ
divers in spent fuel pool 15 granted riefund uill be
forwarded uih«n nruiaa^ed
MIL1ER,H D License Fen M«.nag*munt BraniH 30/07/11 Ip
— BO 0724 01 50 Updated LEU 80-015/01X-1 on HOOH10, during steady »tate power
operation. B tap inttease in RCS leakage observed Causod by
nal failure All four RCB seal cartridges replaced or
rebuilt
SHIVELY, C N Arkansas Power t, Llghl Co 8O/07/17 6pp
B00723O193 HeBponiis to HUG {3006P7 Vtr IB pstt'ntial urpjdingi d« Fie i enc i e«.
in tanks FabriLdtpiJ bn Qrsvi r Tanli (, Mfg Co Facilities hav*
four Graver tan** Iritp confirmed Hint, full p enctrfltiDn uelfl
exists !> uJelJt agrue nj/reqiii remunts tif design drawing?
HUNTCR,R 9 Indiana (, MicJua^"1 Eldtric Co BO/07/ie 3n&
BOO7Z9O331 PNO-W-BO-024 on 800716. plant UIIIE shut down due to primary
to tacdndaru I eat Max radioactivity detected uns belou Toe h
Bpec limit
JOHNSON, H D • HUNNICUTT'D M . MADSEN, 0 Region 4, Dallas. Office of
thn Director. BO/07/17 lp
6O0720OS04 Forwards LER 80-Olv/O3i--0
TRIMBLE. 0 C Arkansas Pamer ti Light Co
BO/O7/1B Ip
Inspection rpporti, IE Dullftin-i !. i otr
8O0722009& Forwards IE liisp Rppts "lO-'H S/HO-01 5, -)O- 3J6/BO-01 nn
8001I1-1B.21-21J.E7-3]. 0£ 1 1 - 1 ?-.'. OJD3 (iri J. 0-115 f. notice of
violation
HEISHMANxB F Region 3, Chic.,i|O, Ru.iccnr ( oi>6t< uc tlon !, Ctvglneer ing
9uppprt Branch BO/O'J/Oti 2pp
134
DOCKETED ITEMS
— 800722(1100 Notice of violation froi in-sp on BOtM 14-JS, 21-23, 39-31 ,
C21l-lS.O3ut-05 t, O4L5
* Bpgion 3, Chitago, Office of the Director QO/05/02 2pp
--BOP722OH2 IE Intp fiepts •jO-.HS.'BO-Ol !. 50-316/30-01 on B001 14-10,
aj-a&.S9-ai,(»JH-ia.0303-O5 f, 0415 MontampUance noted
deficiencies is equi pmEn t classificationi house keep tng.
surveillance !• »nf rac tiona ro atidib findings & prog rani
51REETEH. J F p ilflCK]l4,I N (ieglon 3- Chicago, Office of the
Director HEISHMAH.H F Region J, Tfiicajo, fieflcfcor Construction t-
Engineering Siupport HranrJi BO/05/03 21 pp
#007170426 Forwards It Circular QO-lfl. "Had i oac t i ve Con tarn 1 nation ol
Plant Demlneral i ted Water Sys t, Resultant Internal
Contaminate cin of PDrBOnnol " Nn ui Itten response requirsd
KEPPLERi J C Region 3- Chicago, Office of the Director
IP
Forwards IE Bulletin BO-lb, "Potential Misapplication of
Roseftiount Inc He-dels 1151 t, 1152 Pressure Transmitters
H/Either ft or D Output Codes " WrlttL-n response required
IE Circular HO-ld also end No written responaE required
, J fl Region 3i Chicago, Office of tho Director BO/06/B7
BOO703aO-13 Fnruaiil? IE Infn Notice SO-JJ. "Breakdowns In Contamination
•Control programs '" Nu written response re-quired
KEPPLER.J <1 Region 3- Chicago. Office of the Director 80/O5/5B
IP
£007160394 Remits Fee tn cover NFiC Inepa for period Mar 1779-Mar 1900
per HfiC HQ06.Q3 invoice
HftLQNEY. G P Indiana fa Michigan Electric Co BO/07/O9 lp
B00721O353 Forwards IE Circular BO-13. "Qnd Strap Damage 1 r>
«B5.tinghDU5i? Fuel Assemblies " Ho mitten response required
KEPPLER.J C Region J. Chicago, Uffice of (he- Director BO/O3/SB
IP
BO07O1006D Forwards IE Info Notite QQ-23. "Loss of
Fo*ituater Pumps " No uiDtten response required
HEP PL EH, J C Region 3, Chicago, Office of the Director
tion to Enierjoncij
30/05/39
80073709*5 Forwards Haute Padragana Insp Rspt J 9000027/00-46 on SOQ329
1. notice Of violation
DAVJSi A 0 Region 3, Chicago, Fuel Facility & Materials Safety
Branco 00/0&/1O 2p p
-9007170550 Notice Df violation Ft om tnsp on 800S29
* Region 3. Chicago, OFfmp of the Director 30/04/SB lp
BOQ71705&& Waste Packaoing Insp Rept ISQOEK)27/BO-4i. on BOOSB7
lloncDnjil ianre noted no plac.iriS on shipment boiPE
DECKER, T , 7HDHftS.R & Region 5< Sao Franciaco, Office qf the
Director GDOK, H t Region 5, Ban Francisco, Fuel Facility b
Material^ Bafttij Drench ao/04/EB 6p;p
Foruiardi IE Infa Notice BG-2&, "Evaluation of Contractor
OA Prngrams " No uritten i esponap roquireil
HEPPLER.J O Region 3. Chicago, Office of the Director BO/06/ 10
IP
S0071A01SB Forwards IE JnFo Nolire BO-37, "Degradation of Reactor
Coolant Pump Stud* " No apetific action or respans-c
re ijue s ted
KEPPLER, J G Region J, Chicago. OFflte of the Director HO/06/11
6007110165 Forwards res-pansp to IE Bulletin FJO--Q5. "Vacuum Condition
Raaultlng In Damage to Ch*mica3 Vnl Control Bijl (CWS)
Holdup Tanks " Design review marie oF all SIJE containing )ow
preE«uri tails or lioldup tanks Protective nwasu-ras adequate
E Iniliana t, Michigan Electric CD 80/06/13 £pj>
B007O30206 Responds to IE Bulletin 60-09, "Hirfdremotor Actuator
DePlcienciaa » ITT General Controls Series AH-90 b NH-9O
hijdramotor actnotort are not ubed in cat atij-re lated sgs or
t&mpDnentt
r Indiana (. Michigan Elucti-n Co BO/ 06/1 6 lp
BOO70202-t5 fipspunds to IE Dulletkn BO-13, "Decau Heat Removal
Dperabi 1 1 tij " Incident described in IE Info Notice BO-2O it
not lilelij to occur at plant-leased on nJatpna listed RKFt
si|s T-Bdundsncy !, rtiveriitd mere reviewed
F Eniii^n.a ?, hichiofln Electric Co BO/0&/17 8pp
Foluard« IE Bulletin HO-15. "Possible Lais of Emergencu
NotiFicalion SUE (ENS) W/Lo'5 oF Offsite Pouar " Written
response required
KEPPLER.J C Kaginn J, Chicago, Office of (ft* Director, SO/OA/IB
It"
B00702-05ijfl Poruiards If; Circular BO-15. "4-Ois of Reactor Coolant Pump
Cooling & Uahurctl fircul.iti on Cooldnuin " No urttten ravponsr
required
KEPPLEft.J G Region 3, Chicago. Office of the Director 80/06/20
B007tBQ3?4 Hefp&ndB to 800316 lir forwardltt} IE Bulletin BQ-Od
Energ i intlcn of rrat tor trip break E-r fa rlosing ten Is IB
strictly manual operation Etjuipratnl floes not rhange
emargenci] mode because of trip figfint rpset
HUNTEJt,ff S lndi,ma i Michigan FlectrU C<. BO/Ofc/EO 8pp
8007l50i9i Submits reply to IE Bulletin BO-10 re contamination of
nnnradinact i ve «y& (. potential for releases Adequate
monitoring is performed routinely on sys to preclude
release problems No Further action required
K/lLOUEY.O P Indiana t, Michigan Electric Co 80/07/10 2pp
S0072200BO Submits replg to IE Bulletin BO-10 re contamination of
tionr adloactive sijs f. potential for releases Adequate
monitoring is performed routinely on ays to prneludH
release problems Ma further action required
MALDMEV.e P Indiana K Michigan Electric Co BO/07/10 Epp
000723026"? Faruiards reply to IE Bullatin OO-l 1 re masonry Wall de*inn
Structural intpgnty evaluation of masonry ualln in
underway Full evaluation uill be completed
MALONEY.O P Indiana « Michigan Electric Co BO/07/10 31pp
6007300353 Corrects typographical error made in trantcribino dit" to
Table I of response to IE Bulletin 80-03 re damage to
chemical vot control SIJB tanks Amended Table I end
HUNTER, R 8 Indiana & Michigan Electric Co 00/07/15 2pp
D00731O27B Aclc receipt of 8QO&30 1 tr informing NRC of step* tnlifn to
correct violations noted in IE Inflp Repts 5O-315/BO-04 t
.HEISHMAN.R F Region 3. Chicago, Reactor Operation* Nueleor Support
"ranch 80VO7/a3 lp
— B0073102H4 Foruards response to NRC B0050H Itr ro violationa nottd In
m Ins,p Hepts 50-31 5/BO-Ofl (. 90-316/80-03 Corrective
acti-ons procedure changed to prohibit UBB of hoses for
making up water to spent fuel pit & valve 3 locked cloud
DOLAN,J E Indiana t< Michigan Electric Co BO/03/30 3pp
B PerioSic ape-rating reports & related correspondence
B007190942 Fnr-uardi monthlu operating rept for June 19BO
SMALLER* D V Indiana J. Michigan Power Co BO/07/09 lp
— 80G7I30S47 Monthly operating rept for June 1900
OILUETT.W T Indiana Jc Michloai) Power Co BO/07/O3 App
9 Reportable <oc curr-eticeB, LERe
jlated correspondence
6-QQ7H80910 RD during Apr 1-7BO. estimated unlfiht of fiah impinged uiai
substantially above level normally eipenenced Preliminary
estimated weights for May indicate above normal fish
Impingement level Final environ impact rept pending
SMALLER, D V Indiana b Michigan Electric Co BO/07/03 lp
BQ07130586 Forwards LERs BO-Oia/03L-0 ft BO-013/03L-Q
SMALLER, D V Indiana t, Michigan Electric Co SO/07/08 lp.
— BOD7150397 UEfi aO-OI2/03L-O on B006O9, tuio cheek valves, R-19A b R-157.
discovered utiliied as containment Isolation valves Valve-*
were, not included in type C leak test prior to Nov 197B
Type C leak test performed & check valves added
RJSCHLINQ. J L Indiana t. Michigan Electric Co BO/07/OB Spp
— flOO715Qi23 L.ER HO-013/03L-O on 80061A, transmitter for steam s«n»rator
level lo-op A (BLF 142) found to be out of spec loui Cause
attr taut-etf to instrument drift Tranami tter, Bar-ton Model 7M
rocaHnr *; returneit to BVC
DELONfii S D Indiana t< Kichigan Electric Co 80/07/08 tp
BO07150696. Foriuar-if s LER BO-Olfl/03L-0
SMALLER. D V Indiana b Michigan Electric Co
BO/07/10 lp.
DOCKETED ITEMS
135
— 800713Q7O3 LER BO-OI4/03L-Q on BOO&12, du
several areas of seal found cracked !.
failure unknown Design change re^urst
investigate alternate matls
BHOUM. M B Indiana !> Miihii)an Electn
split Lausp Df
submitted to
3l insp, eOO7nOb-)b Kequc- ts rte
tanks fabricated ti y
requested luitJiin 2Q
HasELEV,N C Divisi
= tij-r elated
BO/06/37
V Operator Eiaminat i ons
8007350001 Request!
Forwards revised licensed operator rcqua 1 1 f I cat ion progvt
p»r NRC 80032Q reciuest Only major change Is In cnntrol
manipulation section now requiring iinnual simulator training
*& wall 09 incruaGEi) manipulation requirements
SMALLER, D V Indiana !. Michigan Eli-rtrit Co (30/07/35 12pp
DOCKET 50-31i DONALD C COOK NUCLEAR POWER PLANT, UNIT 2
F Security. mudical, emtrgency !. firt protection plans
e007aiDOafl rorunrds request for addl info re safeguards contingency
plan Format should be revised to conform u/furmat for Reg
Quids 9 34 W/o encl
NOVAK, T M Assiitant Director for Operating Reactors BO/O6/30
Hop
O Ad jud icntoru, correspondence
9007310243 Forwards Commission 000537 memorandum & order containing
dacliion* on UCS 7SO302 petition for reconsideration of
7BQ413 memorandum J< order UCB 771104 petition Bought action
re fir* protection for electrical cables
E1SENHUT.D 0 Division of Licensing SO/Oi/25 B9pp
H Qeneral correspondence
6007020177 Requests tonal deration of liavlng rttomtc EnerQg Council of
Taiuin visit facility on BOOB07-OB Council interested in
observing waste mgt activities Cooperation will be major
contribution to NflC exchange arrangement
LAFLEUR.J D A»siatant Director for International Cooperation
BO/05/13 3pp
8006270181 Responds to 000439 r*o,ue»t For info re M LoMtBre Inquiry
•bout amount of nuclear waste disposed in State of MI Spent
fuel from four operating MI reactors stored onflite NRC
evaluated status of waste mat in 1977 W/rclated TR eiterpts
j H J Office oF the Gxecutivo Dircctoi Cor Operation*
lOpp
P Operating licnnse stage dnrumcntB ti correspondence
8007110530 Advises that Class I fi III licensing f ees, requHBtod In
6004O7 1 tr re revleu of request to employ divers to (lit
stu-ds. in spent pool fuelihave not been revolved Requests
lh<Bt PEOS be Bubmittei) within 13 days of receipt of Itr
MILLER, W 0 License Fee Managomont Branch B0/0(./03 IP
B007010S4A Notification of 800729-31 nnnite moettno u/util to discuss
ln»irvice testing program for pumps & valves
MINER, B Operating Reactors Drench 1 60/06/09 2tpp
D007230099 Requests submittal of proposed Tcrh Spec rhangas provloing
•for redunflancy in decay heat removal capability in all modes
of operation Modal Tech Spots luhiLh would prtividn HCCBptalile
r-eiokotion encl For guidancn
ElBENHUT.n Q Division of Licensing OO/06/11 6Spp
B00717O1B3 Forwards Amend 21 to License DPR-74, sat ety evaluation !c
notice of issuance t< availability
A Operaling Reactorn Branch 1 BO/06/ 10 2pp
— B00717C"127 Amend 31 to LiConBD DPR-74i adding motiir driven au*iliary
rBedu-ater pump to each unit to separate shared operation of
motor driven auxiliary feeduator pumpn
i 0 A Operating Reactcra Branch 1 BO/06/lfl 3pp
Model Tech Specs, ^e MmJal In
Lessons Learned Cflteyunj n i
EIBENHUT, D O Division of I.
nation (nr ainsnd to license
id i ti on« for TM1-2
BOO?2BOOft4 Informs that requustoO I-IBIII(I tion frnn Clas-t. 1 fee
raquiremc-rit for 81)03^-1 sunini t tcl fin approval to employ
[fivers in sp*nt fuel pool 1= yi anted [Jefuiid lui 1 1 be
f orujardtd uihcn proLEssed
MILLER. W D License Fee M,ir.,igtment Irranch HO/OT/ll Ip
e0072BO-)9J Uespotirts to CIRC 8006^-7 1 ti ID potential uelding deficiencies
ii» tanlia Pabriiattd by IJr.i'Br rank (. Mfg Cci facilities have
four Qravur tdnlie Insp cunfirmnd tfial Full penetration ueld
ff^ists ti ueldB .igrpe LJ/requiruiuc-nts of design itrauings
HUNTER. R n InUjana !• Michigan Elertrir Co F1O/O7/IB 3pp
Q Inspection repiirtt, IE Bullolin' ti i orr espond oni e
0007330095 Foriuards IE Tnap Roul s SO- :il S/liO-01 ^ SO-316/BO-O1 on
900111-1B, El-S'J.aV-'Ji. 03IJ )2 O3RJ-0C, f, O4I5 t, nutice of
violation
HE1SHMAN.R T RcBion 3i Chica-go, ficuctur Com true (.1 on (, Cnfl i nuerino,
Support nran-cb BO/r)5/O5 Sp p
— 300/2201OQ Notice of violation from insp rm BOO1 1 4 -IB, 21-35, 99-31.
OH1 1-12, O30a-OS & 0415
* Region 3. (hicago, QfFice oP tin. Direitor BO/O^i/oa app
— BQ0733011^ IE InBp llepta ID-ll ^/fld-OI 5. SO-ltfa/HO-Ol on BOOllfl-18,
EI-2S, J9-31.OPll-l.Jj 03O3-OS A O<H 0 None omf 1 1 anr e not«d
dcFicienciei. re equipment clflislhuation. limisekeoping,
survelliamcB E' I nFrdc tious re .audit fnidingf. !i pi-ugram
STREETER, J F , .MCK1H. 1 N fie-ginn 3, Chicdjo. affitt, of the
Director liEIBHMAN.R F Hegion H, CJiicaQO, Reactor Construct ion i.
Engineering "Support Qrancli BQWjfOB Jlpp
00-070SOOfla ForuarUa I£ Info Nut ire 0(1 £2. "Break dnwna ITI Cnntamination
Control Programs " Mu uiritton rpsponse required
KEPPLER. J G Region "t. CJucauu, Llffici- of the Dirfitor 00/01/2H
IP
BOO7210353 Forwards !E (.trtul/ir 3O~in, "(,iid Dtrap Hamage in
Was frlnghnusB Fuel Asseinblieo " No ui'itton responso required
WEPPLER. J Q Heglon J, Chitago. Offde* of the Director SO/O5/3G
»P
BO0701006Q F-nruards IE Info Notice 110-513. "|.PS» of Hurtion to emergency
Feed'iuater Pumps " No mritlen i P « p « n «, e required
KEPPLCn. J 0 Rrginn "J, rhicauct, Office of the Director 30/05/39
IP
H00717O345 ForuardE Haste racfcafljng In^p Rept
Si notice of violation
DAVIS. A 0 ItEiiif" 3. Chicane, Fui?l C^ility
Branch 00^06/10 2pp
'• Hateii^ls Safsty
nt)0717O530 rfotn e of violation frnm map on SO
» F)«gion 3, Chicago. ClfHici at the Dli-ortor
— B007J70556 Uaal-e P.irtitgino ln*|> lippl |1()Od027<lKl 1>, on BOU229
Noninmp! iflnci' nntpd nu pliic.rril on i,h i pmenl, Cjcne^
DECKER,! . 1Htll1ftb.fi D Begum ') San Frnncisco, Uffice pf the
Director QQQH, H t Region 3. 3»n F'lanflseOi Fuel Tacility !<
Material's Bafittij Branch e 1/01 /SB fepp
B007&POI4B Foriuarda ft In*» Nutite (t')-?A, 'Tval nation of rnntractor
QA Program* " No mritLcn rropuiisi. required
KCPPLCR. J 0 Rug. on :ip CftiLajo. Dffjci- D( thr Dirpctor OO/06/1Q
— B00717O13I Safety uvaluation supportiiiD Amend 31 to License DPft-74
* Opt-rnting Keartors Branch 1 Bf)/06/lfi 6pp
Notice of issuance ti availabilltu of Araond 21 to License
DPfI-74
VAROA.B A Oporating lleactors Dr.lnth 1 BO/O6/1B Spp
BO&7030591 roruards response to request concerning addl Info gn
r»»poti4es to NRC short-tet-m requirements for auiiliary
feeduatur sys
DQLAN.J E Indiana t, Michioan Electric Co BO/O6/SI, 4pp
B0071t015Q Fflru
Coo.lanl Pum|f
req.ue5 ted
KEPPLEFI. »«
IE Info Notice FliJ-77, "Dcgr.idi.tion uf Reactor
" Nil sopcifi! jt I ion in ri'S|M«ns«
(lug'or 3, Chitagn. OFFicc of the
a007Jlf»'565 Fpruiirifs rebponse to IE [tulJerin RO-U&. "Vacuum Tandltlon
Resulting in Dflmayc to Chemlcul Vul i uritroJ ^ij 6 (cvrsi
Holdup Tan*K " Desisn revieui innd-P of &li ^ys conlaininq loui
pressure tanks nr n old up Vanks PrulDiU^e me.i' LTB* adp^uiite
DOLAN, J F: Indiana !, MUlunan (r If ctti i Co BCi/O^/13 6pp
136
DOCKETED ITEMS
at)O7O3O20<j Responds
hydraiaritor
c omp clients
DDLAN, J K
IE RuUetin BO-0<J, "Hifdramo tor rtrtuator
jneial Lontri.ls "loriEs AH-70 !. IJH-90
rir p nijl urEd in s.if elif-r e 1 ateci 546 or
S Reportable occurrences, LEHa
olated correspondence
6007090239 Forwards LGR BO-025/03L-0
SMALLER. D V Indiana S. Michigan Eli
E1007O2O245 Responds to IE Dub let in BO ! <= "lipcsy Heat Removal Sys
Qperab i li tg " Incident desiribed in IE Info Notice BO-2O is
not likely to in iwr at p lant. ba son1 on reasnni listed RtlH
sys redundanci) *< rii/ersity u>ere r-tvieueil
DtJLflN. J K Indian.) '. MictilQun Eltetrlt Cn 8O/06/17 Bpp
— H007O7O292 LER BO~03'5/03L-O on HOOtOS. during normal operation!
engineered safety feature vent fan HV-AES-1 circuit breaker
tripped Tenderinn ventilation sijs Inoperable Caused by
failure op wiring insulation in connection boies
GFiOVJN M 3 Indiana t. Michigan Electric Co 80/07/02 Ip
BOQ7O3CO42 Forwards IE Bulletin £IO-Jb, "Pustiblo t.uss of E
Notification Sut, (EM'S! H/Lu«.s « F Offiite Pniuer " Urittt'n
KEPPLER.J C HL-gmn 3. •ChicaB"- Office of the Director
IP
HOQ750051O RO during Apr 19SO, estimated uoight of fish Impinged uao
substantially above level normally experienced Preliminary
estimated ueighta for Ma if indicate above normal fish
impingement level Final environ impact rept ponding
SHALLEfl.D V Indiana !. Michigan Electric Co 80/O7/03 Ip
B007O2O56B ForiuardE IF Circular SO-J5, "Lots of Reactor Coafcant Pump
•Cooling t. Natural Circulation C(lr>]diuwn " Ha written response
requir &d
HEPPLER.J G Rpq-mn 3, Chi tag n. OffitP of the Director 80/06/20
IP
Responds to SQD3K3 Str Faruarding IE Bulletin BQ-06
En?rgiiation uf reactor trip breaker', closing colls is
atrictlij. (nanufll oppration Etiuipment do-et, not change
emergencij moilo beiause of trip siyniil react
HUMTER.R S Indidiid !. Michrgan Electric Co DO/Oi/20 Bpp
BCQ7l7Q42ti rorujards It Circular BO-I4. "Radinactivp fiontami nation of
Plant Bp-mineial lied WatET 3ijo f. Husullnnt Internal
Contamination uf Personnel " No mrltten response required
HepPLER.J Q Hcqinn 3, Chicago, Office of the Director 00/06/24
IP
000723030^ Foruar-Ss IE Bulletin UO-lfi. "Potential HUappl i cation of
Rosemount Imi Nudela 1151 !i ll^a Pressure Transmi ttor-B
W/Eltfier A or I) Output Cotlti " Written resjionse rcq.uirod
IE Cirtulnf QO-lft als.o pfic 1 No -uirittcn reeponae required
KEPPLER.J S FfBgion 3, Chltogiip (Ifflce of the Hirector BO/Oi/a?
IP
DOO71603G4 Remits fi^K to novel MRC insps for period liar- 1979-Mnr 17BO
per (JFtC 300603 i nvn i c e
h^LONEV.fi P Indiana ft Michigan Flettric fo 00/O7/09 Ip
000735001i Foruards re^pon^fl tp Ik Bulletin 8C-C1B. "Eiamina 1 1 on of
Containment Liner Pent-tral i im UeldE " Facilities contain
flu-ed head! dpsign for containment penetration connectlnn as
Illustratod in CigurB hJE-llHO-l n-F rtSMC B li P V code
MAIOHEY.G P Inbi«iin !. Miclngen Elsclric Cc BO/O7/01 Hpp
6007520080 Submiti reply to IE Bulletin ifO-lll re cpntamlnati on of
nonrac! i oac tive '.IJH !. poleTitial For rolpa&cE Adequate
monitoring ib [>prformE?d routinely [in -QIJS tci [ireclude
releasp nrohltm11 No further action required
HALOHEV.U P IniJjona tt Michigan Electric, fo no/07/10 2pp
For-uiardi LER BO-Oa6/O3L-0
SMALLER, D V Indiana !< Nichirjan Eli
:tric Co BO/O7/OB Ip
LEft BO-O2i/03L-O on BOO609. ch DC k valvos R-1S6 fc fi-137f
utilued as containment isalatlpn valve = i found omitted from
Type C leak test Valve [1-136 Installed backwards Caused by.
omission in procedure Valve R— 156 reinstalled tt tented
FUECHLINC, J L Indiana f, Michigan Electric Co 8QY07/OB 2pp
BOO7210J37 FormardB LER BQ-OE7/03L-O
SHALLCR, D V Indiana & Michigan Electric Co
— 9007210341 LER BO-OB7/03L-O on BQ0613, during piping mod. hand shutoff
valve in suction line to motor driven auiillarij feed pump 1
was closed to stop leakage interfering u/ujeldina Pump iuae
inoperable until completion of welding
LEASE, H S Indiana & Michioan Electric Co BO/O7/14 Ip
Operator examinations
B00731O379 Forwards revised licensed operator requal i fi cation progr-an-
per NKC 8003afl rei|uest Only inajor change Is in control
manipulation Eecticm now requiring annual simulator training
as IDE I 1 as increased manipulation requirements
SHrtLLER.D V Indiana b htichigon Electric Co 80/07/35 12pp
DOCKET 50-317 CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT 1
E >NHC Safety Evaluation Report (9ER). Euppls t< correspondence
0007310416 SubnitB Dep t of Public Safety comments on NdC revieu t.
safatij evaluation at fire protection tc life safety Licensee
should be required to provide flro doors *< automatic
suppression HIJE -as necessary
RIDDLE. H H Calvert County, MD HO/07/14 3pp
F Security, medicalr emergency fc fire protertian plans
B007330P6V ftiruaTils reply to liE Dullptin BO-1 1 re nrii-sonrtf uall design
Structural inlogntij I?VH! ua t inn of mcnonry walls i«
underuag Full pvaluation utll lie completed
MALOMEY, B P Indiana t, Miiliiu.ni Electrtc Cn UO/O7/1O 3tpp
B00716034S Foruards response to NRC comments re security training fc
quallf icatlon plan Response !( revised plan uiithheld
(reF 10CFRS 770)
EVANS.V R BaHlmore Oas & Electric Co BO/07/lfl Ip
ao073aoa'1iU rnrrprls typ ugraph i cal error made m trnnscr ib infl data to
Taule 1 oF response to IE Bulletin flO-d-ft re damage to
chemical unl ci.ntroi nys tanks Amend oil Table I enc 1
HUNTER.!) =1 Intlirind '. Mjthiasn Hucrrii Co RO/07/15 Spp
ao073IOP7il rtck receipt nf aOO''30 Itr informing NBC of steps taken to
correct viold t inns noted in lh Insp Ropts 50-^1 5/E!0-Ofl t,
HEISHM*VN.R F fieyion J, Chicago, llo/ictor Opnrations Nuclear Eiiiprtort
Branch BO/07 /a-3 Ip
i f-orwarti' ruspunsi' tti NRC S00502 I tr re violations noted in
IE Inss|i fief Is 5O-3lD/HO-On t< 5O-3tfi/f!0 -OJ CnrracUve
action' pi or 1'iliirp chdng-ci) to pTiihiblt use nf hoses tor
mafcjnq up ustcr to i.pont fuel pit d valves locked tlossd
DCJLrfN. J L Indiana i. Hicdigan Elpctric fo HO/O5/3tl 3pp
f,pprLir-inrj ri'part^. t. telati.d t, nrrcagcinefonce
B00715JB5& Foruariii monthly nfpintin.(j rcpt Pcir Juno 11BQ
V I-idiPina i- Michigan Power fc HO/D7/09 Ip
BQa~f33D3*JO Infnrms that scheduled ilate for conducting add! cable tray
penetration Fire teats ui 11 be B00730 at Southwest Lab. Ban
A-ntonioiTK Tests are designed to verify addl design of cable
tray fire stop*. tJRC has opportunity to witness fire tests
LUNOVALU. A E Baltimore flas t, Tlectric Co HO/07/14 Ip
(1007200431 Suhfflita lorrectioii to util 1300402 submlttal of facility
modified amended aocority plan, Revi fiion 6 Encla 1 ti 3
Incorrectly M"Flected Revision 5 Ends should be changed to
Revt si-en 6
EVAHB.V R BaltimDre Oa 3 & Electric. Co SO/07/aa Ip
cori-uspondent.e
130073 102-1 3 Forwards Commission SOOS27 memo rand urn ti order containing
decisions on UrS 7B0503 patition for recan&ldoration of
700413 inemorandi.in E< order UCS 771104 petition sought action
re Fire protection for elrtutrical cables
EISEWHOT, D G nwision of Licensing SO/06/25 89pp
Montlilij njHTiitmij rppt for Jinit IflflO
eiLLtTT.H T Indiana ft Hiihigflii CnwET Co tift/07/03
137
H General correspondence
6007.230351 Responds to B00515 Itr re JA May questions about facility
QOO3E7 radioactive gas leakage Leak caiissij bij poor gasket
iial on Unit 3 degasslfier relief valve W/safety evaluation
of util puit-TMI changes
D5RCHS. W J Office of the Emrutive Director for Operations
SO/O7/07 3pp
— S007090'Jfa 1 "Staliitir.-il r6mlnn.it lun uf Unc er t .1 1 nt i p&, Par t 2,"
no-nprnpnetarij vers i on
* Combustiun Eng ineen ni), luc ^EN-1P4 ( B I - NP PTJ Po/Ol/31
7Spp
— aOO7Q903fcH "Statistical Combination uf Unc er taint i c 5, Par- 1 3."
titinpropriEtarij version
t C-E Power Systems CtN-1241 D ) -NP F>1 3 13Q/O.J/31 B5pp
— BQO735'QS&4 Requests response to eticl JA May Itr requesting info TB
recent Incident at facility
SPELLMAN. 0 N House of Rep BO/OS/ ID Ip
O Advl&aru, Committee on Reactor Safeguards reports
correspondence
770622O1S& Summarizes responses to 1C Bulletin 79-060 Operating manuals
are be ins scrutini led Operational personnel are being
trained Radioactive gases !< liquids transfer lines are
Interloc k»d u/ containment isolation &/or radiation signals
TAHp P Division of Site Safety Ci Environmental Analysis 79/Q9/OB
P Operating license stage documents & correspondence
6007230097 Requests submittal of proposed Tech Spec changes providing
for redundancy in decay heat removal capability In all modes
of o-peration Model Tech Specs which would provide acceptable
resolution enel for guidance
EISENHUTi D 0 Division of Licensing HO/Oi/11 6Spp
B00701O3Ae Notification of B0071S meeting ui/utll in Bethesda, MD to
dlscuii Chalk Point 900 kV transmission line
LljC.Y Operating Reactors Branch 3 (Pre B0042B) BO/Ot/16 Ip
80G717O066 Notification of cancellation of 800715 meeting u/util in
Betheadai MD, to discuss agenda re 500 kV transmission line
LI,C Y Operating Reactors Branch 3 BO/Q6/16 IB
— 8007170071 Confirms telcon re cancellation of BQ0711 meeting iu/util ir
OetliBida.HD re SOD kV transmission line
FAUST, R,- Plant Systems Dpaneh (Pre 791030) BO/07/02 Ip
0007020469 Summary of B00605 fneetino m/util in Bothesda. MD re ofPsite
pauer sources
LliC Y Operating Reactors Branch 3 80/06/18 4np
BOO7Q2Q43fa ForyardE pi-Dposed leih "3pet , Chdiigc's l !, S to amend OLs
Change 1 clarifies definition of "eperflhle" allows
substitution of inatolled fo<J t y nflsitc pouitr- sourc-C in
oveut of transf cirnier Failuie Ft e eric I
LUNDvALL.A E Baltimore Gat '. Elcttric Cn ao/0(./E!7 2pp
4y PropDbBd Tt'ch SpeL Ctiiinge 1 tlanfies definibinn of
"operah le "
* Baltimore flas (. Elpctrii Co a(VO&/27 i,pp
fla Prupns,Bd Tech Spet Ch.ingi- 3 AMvias substitution of installed
fa9 kV offaito power sourcn, i n sstvad of 5OO kV ofFsite power
BOiircffB.in event nf transformer Failure
* Baltimore (Jab & Electric Co BO/06/J7 3p p
BOO7020S57 ForujarilE "RCS rtbymm* trie Luads Evaluation Program, " final
rcpt in responso to NRC 7B0135 Iti to FUJI I i rc-nuces Ttt
asijmmctf-ic LOCA loads C-E nffiildvit for withholding encl
Proprietary vei-aton of rtpp ft uiitht,eld (ref 10rFH3 79O)
LUHDVALL.rt E C-E Operating Plants dinners Group BO/Ofi/aO 3jip
—80070^0374 "RCS rtsymmetric Loads Cv.-vluation Piopram," final rept,
Vol J
<i c-E PoiuEr Systems RO/O(i/3(l BOpp
B007020SB1 "RCS Aaymmetnc loads evaluation Prnsrara, " final reft.
Vnl 2
« C~E Power Bystoms BO/O6/30 DUOpp
BO070a03HB "fiC!J AtymmHtt ic Loads Evaluation Program." Final rent. Vol
3
B C-E Power qustems HuyOfc/JQ 300pp
8007030593 "RCS Asijmmetr ic Loads Evaluation Program." final roptiftpp A,
numerical results, evaluation &f C-E fuel NnnuropriBtarij
version App Q. pal Isdilea fuel anal ij a i s, erir 1
* C-E Poiu*f Gtjstem5 B0/0t/3i) Pfapp
B007O2O349 Discusses 790727 application to amend Tech SpecBi including
prop 01. ir d revisions to organisation chart !( safety committee
aen'ber&bip Foruarda supplemental changes to current
org-anl i atlon fe safety committee mmnber'ship
C Baltimore Oas b Electric Co BO/0&/24 Ip
— BOQ7O2O3S4 Buppl emeritary organ! ?ati onol changes to Tech Specs for
administrative controls
» Baltimore Qas 1 Electric Co 80/06/24 flpp
0007010339 Discusses concerns u/interim reliability evaluation progr-am
as autllned at 300613 meeting ui/NRC Includes problems ui/
iChviluliiigimethodDliigyi timingi licensee participation &
vagulacory ratcheting Suggests licensee Aiethodnlogy input
LUNDVALU ft E BaltimorB Gas t, Electric Co 00/06/39 4pp
800709O324 Forwards proprietary & nonpronrietary reviaions of C-E
nargin improvement vepts justifyino recovery of margin
! nh,*T" ent 1 Y available in design Affidavits encl Proprietary
r»pt withheld Cref 10CFR2 790>
LUNDVALL.A E Baltimore Gas t< Eloctric Co BO/OJ./26 2pp
— BOO7O90332 "Bass U<» nf IIICOTD Detector Sijfl to Monitor DNB-LCO on
Ca-lvert Cliffs Units 1 It 2. " nonproprietary version
« C-E Power Systems CEN-119!B)-NP 79/11/30 21np
— BOO7O90341 "CEAU Method of Analy7inB Sequential Control Element
Aasomblij Group Withdrawal Event for Analog Protectod Bys, "
nonproprietary version,
« C-E Power Systems CEN-121 (D 1-NP 79/11/30 ISSpp
— BQQ7O9031& "FIESTA One Dimensional. Two Group Space Time nineties Code
for Calculating Pun Scram Ruactivi tins "
<t C-E Pouer Systems CEN-I331B) /'J/ll/30 75pp
— B007Q2UAOO "RCS Asymmetric Lands Evaluation Program," App E, ECCS
aralyiis approach u/rfftluc ed area cuolant channels in
peripharal assemblies Final ropt
* C-E Power System's BO/0&/3Q 9pp
90071703191 Summary of B0061E i.ioeting ui/util& in aethesda, MD re interim
reliability evaluation program
DLBHAN.L N Qptrating Reactors Br.intrt 1 £10/06/30 3pp
B007B5O001 Reqimets <=ubmitt<il of application fi,r amend to licence
consisting of Tech Spec. Lhange* fc license couditiorjs PWH
Model Tech Spites It Mode] liLBnsp conditions for TME-&
Lasaons Learned Cfttegury f, items PHI 1 for guidance-
EIBENHUT.D fl Division nf Lttflnsinj CO/07/02 l&pp
S0071B007/1 Notifies thot C-E /'/1?O3 Tpque-it fot- route approval to
cover -spent fuol shipmants to SHI 1 \, suu j io llren^e
fee Review of request was tumpleti'd on QUOEc!fi
MJLLEFI.W 0 l-.iter.sn FSB M^riagempnt Droiicli 80/07/On Ip
B007070291 Submits ddd) info rtrqiiosteil bij NHC /90T31 Itr re 790703
request For ameni) to LICEIIBPS DFJR-33 fi nPH-i"3 concernina
spent fuel poul mod Strur tural r, liner (Jlslffi analijsia Hue!
LUMDVALL.A G Baltimnrp Qa« 'i Elnctric Co SO/07/O7 21pp
BOO7230176 BummaTi> of HOOfiia meet ing uj/uti 1. Mui Icar Energy Svc !i
Bechtel Pouiar Cnrp rt> spent Hrt 1 pool "-art stiiicbufo design
LIiC V Dporating JJurtctnr^. Bruin h ,j HO/O7/OE Tlpp
8O0734O3B1 Advises of NfJC rcoroftnn JCIOTI on HOOrtHH uiJiich resulted in
numder of thonge1! in oft tit 1 e-i, ji nai -t i tins !« I'.i i gni'iiTsts of
personnul AS BO submits iriFd ( ui 'iETIl
, T H AEdisUnt Direclnr fni Diitratjng R&rtrlurs QO/O7/03
-BOO7O903Sa "Btatistical Combination of Unccrtainti BS. Part I, "
nnnpToprietary veraion
* C-E Pouer BystamB CEH-IS4(D)-NP PTJ 79/12/31 65pp
QOO72iOnfaq Hoti-TiLution of ntHl/17 <n i- c t i TI u u/uti] in ncthesda.MD to
(tiscu&s IB-mnntli tutrl carles Fin Taiility Ut i 1 h r-E will
present pi evmu of tToLumentali un ID be u^cd in facility
Cycle 5 TH load 3iialuBia
LI.C Y Bperiatinij RoJctors Dr.mcti ^ QO/O7.O9 3pp
138
DOCKETED ITEMS
BM7I7Q15.! Appuc-t.an tvr t^t to Liases DP «"^ DPR-69. rev, sinS
Paragr-apn fl S ! t. >. adtfing Paragraph 4 5 1 F t& '"" up
r-a Frr-1? (Lurup i 1 I aric e rttiuireneftts „
LU.DWLL.TF ff.it,«0rJ Q« '- Ei«tr,c c, 8o/o7/n ^PP
--H007I70353 PMPot-d Te=h Spet , re ECC5 -urve , 1 lance re^ire-nents,
rejisina Paragraph -1 5 1 Ij •!. adding Paragraph 4 5 I f
i Baltimore Cas «, Electric ru aO/O7/14 Ip
0 Inspettmn repnrts, IE Bulletins !< f or respond enr.8
B0070?oa5i, Foruards update to util 60041? response- to IE Bulletin
79-Q1B. "Environ Qualification of Class IE Equipnent
Evaluation o* available o.ual l f l cation data far components
• ic-Bcted ID be connleled (.y BOO&30
LWDVALL.A E D^Himore Qa* t. ElectrU Ca 80/05/37 20Qpp
B0071G0600 Responds tp IE Bulletin QO-10 Rnvieui u P nonrad io«c t IVB
included valve 1 i neups, lea* ino valvofi !. points of contact
between radioactive * nonrad* oac tive phases Addl
surveillance of nonradieac live ay!, uiill bo imp 1 omontod
LUNDVftUU. A E Baltimore Gas !. Electric Co BO/O6/19 Ip
3007030403 Forwards IE Circular BO-IS, "Loss of Reactor Coolant P
Cooling <• Natural Circulation Cooldomn " No written relponn
QRIER..S H Region 1. Philadelphia. Office of the Director
Ip
BOu71bOfiSS Faruarda IE Circular QO-lfl, "Radioactlvo Contamination n»
Plant Demlneraliteii Water S<js (. Resultant Intornal
Contamination of Personnel " No ujritten respons* requirril
ORIER.D H Rffflion 1. Philadelphia. Office of tho DirBltor
Ip
— B007090359 Foruarri* corrPded rB6pDn5e to IE Bu
Ctualification of Class IE Gqui pmunt. " rsplaiing incomple
vtf-Bion foriuarded ny AE Lundvall 800303 Itr
A5H,R F Dalti^&re Cas !. Electric Co 00/03/05 BOO[>P
n 79-01EJ. "Environ
B007210I71 Foruiflrds IE Info Notice 0O-34. "Loio Level Ractwatlff
Criteria " Nq written rBspunsB raqulved
H Region 1. Philadelphia. Office of the Dimeter
60070301:20 Forwards IE Info Notice 80-33, "Breakdowns In Contamination
Control Programs " Ho written response required
GRIER.H H Region 1. ph 1 1 aJelph I ii. Office of the Director
BO/05/3B Ip
Q007010379 FDTuards IE Info Notice 00-23. "Loss of Suction to Emergency
Feedurat" Pumps " Ho written response required
GFUEn.B II flegtan 1, Ph ( ] adetph id. Otftte of the Director
SD/O5/29 ]p
BOO717O1M Resjionoa to IE Bulletin BO-OS, "Vacuum Condition Resulting
in Dajsaje to Chemical Vnl Contra] Sijs (CVCS) Holdup Tant s "
Cantinued operation. evtn during interim period of
nitrogen sys setpnint nod. juiti Fied for listed reasons
E FaltimDi-e Gas !. Electric Co BO/Oi/Q4 Spy
B00721O34! Foruiards IE Insp Wept* 50-317/BO-05 !< 50-31B/80-0-5 on
300^07-30 NQ noncomp] iance noted
QHUNriEfi.E J Beaion 1. Pni 1 adelph la. Reactor- Operations Nuclear
Support Branch BO/O4/G4 Tjip
— QQ07310247 IE Insp Rspts 50-317/BD-05 h 30-31H/BO-05- on BQQ407-30 No
nontomp 1 laneB noted Major ariras inspected control roam t
accBS-sible portions of aunliary turbine avc ti intake bldgs,
radiation protection '= physical security
AHCH1TZEL.R fle-gion l< Phi l»d elplii a, Ottite of tfte Dir*ctar
MCCABE.E C Region !. Philnde-lpft ia, Reactor- Operations rfjclndr
Support Branth 80/05/30 ?0pp
B00722O27B For-uiards IE Insp Rcpt 50-317/BO-07 on 200427-0501 No
noncompl lance noted
CARLEON-R T Region 1. Philadelphia. .Reactor Construction t
Engineering Support Branch BO/Oi/Ofl 2pp
--BO&732C2B5 IE I nip ftept 50-317/BO-O7 on aoOt2-?-033! Ho none onpl lance
noted Major areas inspected pipe- support activitlei
pei-Fcrned to lonplij uJl£ Bulletin 71-O3 £ radiation isfetg
procedures
DURfl, J P . SER^DIAH, J A negiort 1. Philadelphia. Office of the
Director TRIPP. L E Region li Philadelphia, Reactor Construction
« Engineering Support Branch BO/OS./23 13pp
8007230096 Forwards IE Dulletin BO-1&. "Potential Mi napp H c at i on at
Haaenount Inc Models 1191 tf 1132 Pressure Tranaml ttera
H/Either A or D Output Codes " Written response re-quir-ed
IE Circular- 00-16 also oncl fJu written T esponae required
OniE(I,8 H Region li PN i ladelpbl a. Office of the Director
aO/Ci/27 Spp
B0072BO663 Corrects B00604 responso to IT Dullotin QO-09 Dpamtlnfl
eiperierrcB has snouin that evon if reactor coolant drain tank
la pumped to mai flow rate, tan* pressure remains greator
than atmospheric pressure
LUNDVALL. A E Baltimore Gas t. Electric CD BO/0(,/37 2|ip
E00710033B Bubml ta info re- fluid heart design potnttratlan conn»cli Ion*
or other designs u/ containment boundary butt yclds bttuoen
sbevve t* process piping, per IE Qulletin SO -OS
LUNDVAUL.rt E Baltimore Oas !. Electric Co BO/07/03 Hpp
BD07310044 Submits status of eitonswe surveg praaram initiated In
response to IE Dulletin BO-lt Accounts for- half of ma-saniry
walls TB-quiTlng insp Remaining i tons ulll bo covered In
Final T»pt to be submitted after completion of survey*
LUMDUrtLL. A E Baltimore Oss !' Electric Co BO/O7/03 3Bpp,
B0072I0374 Responds to IE Bulletin 00-08 Each unit containt fivo
oenHlrations u/flued heatf design Penetrations N-atampnid pnr
renulremants of Paragraph N-153 of ASME Corte, Section HT,
Bummer 1979
LUNDVALL. A E Pacific Oas & Electric Co 8O/O7/O3 4PP
BCK>7250Qli Forujflrds response to IE Dulletin BO-OBj "Eiarninat I on of
Containment Linur Penetration Welds " Facilities contain
flupd head design for containment penetration connection at
illustrated in Figure HE" 1 120-1 af ASME Q t« P V code
HALDNEV.O P Indiana (. Flichigan ElectrU Co 00/07/01 Spp,
ft Pertodic operating reporta & related corrp-npontl e-nce
BD070I03B9 Foruards monthly operatinfl rept tar May 1*780
flERSOH, B D Baltimore Oas & Electric Co 00/06 /1O Ip
00072 1 055* Forurards IE Info notice aO-2i, "Evaluation of Contractor
QA Programs " MB written i-esponss requiTEd
GR[EfT,fl H Region I. Philadelphia. OF-ficc of the Director
60/O6/10 Ip
80O7J6O337 Fnrusi-ds IE IriFo Notice BQ-3J, "Dejradflti on of Realtor
Coolant Pump Studs " do specific action or response
required
SRIERpB H Rpgiari l, pfii Jrfdf Iphia. Office qf the Director
BO/C6/I1 Ip
— SOO70l03fa Hqnthl« operating rept for Mag 1900
HE HBON- S D Baltimore Oas !. Electric Co SO/O6/13 Spp.
— 0Q070103V2 MontMu. operating rept for May 1 ?SO
HEHSON, B D BaltimurB Oas J. Electric Co SO/Oi/12 9pp
•B007B30351 Foruiards monthly operattng repts For June; 19BO
MEfiEOH, S D Baltimore Odo t< Electric Co SO/07/13 Ip,
9007170576 Responifi to !E Bulletin BO-Ofi, "Engineered Safetij Feature
(ESF1 Reset Contrnla " Teat to VPr i f u tfiat actual installed
control) are consistent u/c<flcmatic s reviewed mil be
completed1 during Fall 1*80 & ear til 17B1 refueling outages
LUUDV/LL., A E Baltimore Gas t. tlectrlc Co BO/Ofc/17 4pp
— 9O073303S5 Monthlo oporatins rents for June 17BO
HER SON, 3 D Baltimore Oas & Electric Co 30/07/15 IQpp
S Importable occurrences! LERs (< related correspoiKle/nce;
BOQ702Qc.H Foriuards IE DullBtin 30-35, "Possible |.oss of Emergency
Notification S,j4 (ENS) (J/Los-s of Dffnte Power " Written
reiponse requa-r-sil
&HIER.D H Region 1, Philadelphia. Office af the Direct-or
BO/Oa/JB Ip
BO07SS015i Foruiartfs LER BO-031/03L-0
BUSSELL.L B Halt inure Oas i Electric Co 80/O7/1B Ip
— B0072B0153 LER BO-O3U03L-0 on BO06S5,higli oil temp alarm T-ecnlV»d Oft *
kV unit ivc transformer Caused nij Failure of cooling f«n«
due to blauin fuse in control circuit Fun did not transfer- to
backup pouer supplu Cause unknown Fuse rep 1 at ad
DAVI3.9 M , DAUFR.E R Baltimore Oas * Electric Co HO/O7/1O
IP
DOCKETED ITEMS
139
8007280664 Foruiards LER BO-039/O3L-0
RUSSELL. L B Baltimore Oat fc Electric Co
HO/07/ IB Ip
— 8OO72B0676 LER BO-O29/Q3U-0 on BOOM6. control room air coniti tioning
Unit 11 placed out of svc to repair broken damper linkage*
Apparent cause was excessive wear due to inadequate linkage
lubrication Periodic lubrication instituted
DAVIS, B N . HU8EBV.D E Baltimore Gas I, Electric Co BO/07/ 18
flO07O2O3t'9 Discusae:, 79O739 application to amend Tech Spec E, me 1 Uding
proposed revision1; to opgani lat i on chart & safety committee
membership Formal ds «,upp lempntfi 1 changes to current
organization & safety committee membership
OLSON, R C Baltimore Gas t, Electric Ca HO/06./24 Ip
— BOO703O334 Supplementary organ! lational changes to Tech Spars for
admin 1 strati ve controls
* naltimore Gas & Electric Co. &Q/Q(,/S1 Bpp
DOCKET 50-318 CALVERT CUFFS NUCLEAR POWER PLANT. UNIT 2
E NflC S*fetij Evaluation Report (SEH)i suppls t< c. orreapondence
BQO7310416 Submits Dept of Public Safety comments on NRC review
safety evaluation of fire protection & life safety Licensee
should be required to provide fire doors b automatic
suppression sys aa necessary
H. Calvert County. MD BO/07/H 2pp
P Security, mv/dicali emergency t< fire protection plani
BQO7!i0243 Forwards response to NRC comments re security trainlno *<
qualification plan Response b revised plan withheld
(pef 10CFR2 790)
EVANB.V R BaltlmorB Das d Electric Co SO/07/14 Ip
BOO7B20390 Informs that scheduled date far conducting andl cable trag
p«nitratton fire tests will be BOO730 at 9outhu>Bst Labi San
AntoniOiTX Tests are designed to verify oddl design of cable
tuv Pir* »tope NRC ha> opportunity to witness Fire tests
LUMOVALL.A E Baltimore 0ns fc Electric Co 80/07/16 Ip,
BOO7SBQ4B1 Submits correction to util B004Q2 subinlttal of facilitg
modified amended security plan> Revision 6 Ends 1 !< 3
Incorroctly reflBcted Revision 5 Ends should be tlianjed to
Revitlan 6
EVAH9, V R Baltimore Can ti Elnctric Co BO/07 /as Ip
0 Ad jud lent ory correspondence
8007090335 Foruarils proprietary J. nonpropr 1 etar y revisions of C-E
margin Improvement repte justi fifing rDcovery of margin
InhBrontly available in dptign Arftdavits enc I Proprietary
i-«pt ulthheld irtt 10CFR2 790)
UWNDVALU, A E DaltimorH Oas !' Electric Co BO/O6/26 3pp
— B00709O333 "Bass Use of Injure Betector 3iJS to Monitor DNB-LCa on
Calvei-t Cliffs Units. 1 k 3," tinnpropri etary version
* C-E Pfluer SijEtums. CEN-1 1 7ID ) -NP 79/11/30 21pp
— B00701!0341 "CEAU Hethnd Dp Analgung Sequential Control Element
Assembly Group MS thtfraiual Event for Analog Protected SIJK,"
nnnpropr i etar y vcr s 1 an
• C-E Power Systemu CHH-I2UD1-NP 79/11/30 123op
"F1FBTA Ono Dimuns i anal . Tun Group Space Time Klnptio
for Calculating PVR Scram Reactivities "
« C-E Poyer Sijatews CEM-I33KD) 77/11/30 7Spp
600709Q3S2 "SlatUtlcal Coinli inat i on of UncertaintlBS, Part 1,"
nonpi-opr ietarij vor si on
* C-E Power Systema CEN-1 34(11 ) -NP PTI 79/13/31 &Spp
9007070361 "Statistical Cnmlilnatton DF Unc Bi-taintiesi Par t a,"
nonji-roprietBru vHrsion
w Comhu5tion Ensmeenng. Iiic CEM-iailHl-NP PT2 90/01/31
— 9007090368 "atatiitical Combination of Ulic eMa Inties, Part 3,"
nonpraprle'tary version
» C-E Power Systems CEM-L3<1 1 B>-NP PT3 SO/03/31 B5pp
BO07310343 Forwards Commission 000337 memorandum tt ordsr containlnn
dici»ion» on UCS 7QOS03 pstltion for reconsidBration of
790413 momorandum !< order UCB 77H04 petition sought action
rt firt protection for electrical cables
EISENHUT, D. O Division of Licensing BO/06/25 89pp
0007020436 Forwards propoaed Tech Spec. Changes 1 J. S to amend OLs
Change i clarifies definition of "operable" al lows
substitution of installed 6? W offsite pouer source in
evert of transformer failure Fee enc 1
LUNDVALL.A E DolfclmorB OaB !c Electric Co BO/06/27 3pp
correspondence
BOO7S30251 Responds to B0031S Itr re JA Hay questions about facility
600327 radioactive gas leakage LBak caused by poor gasket
leal an Unit S deaasaifier relief valve W/tafety evaluation
of util post-THI changes
DIRCK0jH J Office of the executive Director for Operations
90/07/07 2pp
— H00703041H Propostd Tech Bjiec Change 1 Clarifies Definition of
"operable"
* Daltimore Oas £( Electric Co 80/OA/27 6pp
— 8007020448 rropofifrd Tech Spec Change S Allows substitution of Installed
A9 *V ofif-Eite power lourcn. in&tEart of &OO kV offsite pouiar
sourceBiin evont of tranftPormer failure
» Baltimore Oas & Electric Co FJO/O6/27 3pp
— BQO7S30364 Requests response to end JA Kay Itr requesting info re
recent Incident at facility
SPELLHAH, Q N Home of FUp 80/05/13 Ip
P Operating license itage documents it correspondence
000723009*7 Requests submlttal of proposed Tech 9pec changts providing
for radundancv in decay heat removal capability in all modes
of operation Model Tech Specs which would provide acceptable
resolution •TIL! for guidance
EISENHUT, D 0 Division of Licensing SO/06/11 62pp
HO07010SA3 Notification of 800719 meeting u/util in DethBsda.MD to
iliscuas Chalk Paint 900 kV transmission line
LI,C y Operating Reactors Branch 3 (Pre B004CQ) 60/06/16 Ip.
0007170046 Notification of cancellation of 800713 meetins ui/util in.
DetliBSda, MD, to discus* agenda re 500 kV transmission line
LliCY. Operating Reactors Branch 3 60/06/16 Ip
— B00717O071 Confirms telcon re cancellation of B0071S meeting u/util in
Dethffsda.MD rB 300 kV transmission line
FAUST, R, Plant Systems Branch (Pro 791030), 80/07/02 Ip
8007020469 Summary of B 00603 meeting u/util in Qethesda>MD r» offiitB
power lourc**,
LI,C Y Operating Reactors Branch 3 00/06/18 4pp
8007O2OS37 ForuardB "RCS AEummetTii. Loads Evaluation Program." final
rept in response to NRC 7SOIPB Itr to PWR licenaees TB
aaymmetnc LOCA loads C-F affidavit For uii thholding tnd
Proprietary veroon of App A uiithli«ld ireS lOCFRa 790)
LUNDVALLiA £ C-E Operating Plants Owners Group BO/Od/30 Spy
— B007OSO371 "RCS AsyniiiiBtrl c Loads Evaluation Prooram." final repti
Vol 1
* C-E Pnuior Syskema 30/06/30 SQp p
— BOO7O203B1 "RCS Asymmetri t L
Vol 3
* C-E Power Systems BO/OA/30
rv^luntion Program," final rant,
3DOpp
— B007O3O3B9 "RCB ftsy^motric loads Evaluation Program." rlnat ropt.Vol
3
* C-E Power Systems QO/0&/:iO
am. " final rept.Aop A,
"RCS AsijinmBtric l.oaos Evrtliration Pr^
numerical results, evaluation of C-E Fuel Nnn
vent on App B, Pal i nades fuel analysis, enrl
* C-E Pouier Sijste'ins SO/06/3O Bibpp
8007Oaoaoo "RC3 Asymmnti-ic Loadi Evaluation Pronram. " A
analysis appr-oaeli ui/Taduei'd area ci.olant ehannnla In
peripheral a&hemli 1 IB s Fin.il rept
<t C-E Power Bvntema (30/0&/30 tfp
Ei ECC9
140
DOCKETED ITEMS
8007J50001 '(piiuesti iulimi ttal of- application For amend to license
consisting of TpcS Spot {•hange'i I, license conditions FUR
Model Tech ispeis t. Model lite.ni! r or>di 1 1 0115 for TMI-2
EISENHUT.D S Division o* Licensing BQ/O7/Q5 69pp
BO0717OS76 Responds to IE Bulletin 50-O&, "Engineered Safety Featuri
(ESF1 Reset Controls " Test to verify that actual Installed
controls are consistent u)/i.cheniatiC9 reviewed un 1 1 he
completed during Fall 1980 6 earlij 17H1 rofuelinp outagoB
E Baltimore Gas !. Electilc Co BO/06/17 4pp
8007180076 Notifies that C-E 791JO3 Truest for route approval to
cover spent futl 'tupraents to BMJ 15 sub j to 1 metis 5
Fen Review of re-quest ua» completed on 800936
MILLER, W O License Fee M.inag sment Br.inch BD/O7/03 lp
B007O20il4 FoTiuarrfs IE Oulletin ao-1 3, "Possible Lose of Emergency
Notification Sys (ENS) W/Loss of Offsite Poyer " Written
response required
H ROB ion 1- Phi ladelph la. DFfice of the Dlrector.
BOO7Q9Q271 &u*mith aiJdl info requested by fjRC 7709131 1 tr re 7907O3
requost for snipnd t P Ljcsnses CPH-52 tr EPR-69 concerning
spent Fuol pool mud Structural tt liner filritp analysis, oncl
LUNDVrtLL.A El Daltirnnre Gas !. Elpctnc Co an '07/07 31pu
BDO-7330176 Surananj uf B00610 meeting ail ut i I, Nuc 1 ear Energy Svc J,
Bechtel Pnuer fiirp rs spent Fui'l pool wad structure design
L1,C V Operating Reactors Br.mch 3 3Q/07/Q8 5pp
8007240380 Ad'.istfi of URC rcoi gan 1 1 a ti on on 800438 which resulted In
number of ch,-inr|5i in o PC 1 1 1 1 a^> p osi tiOTis fi assignments of
personnel Also submit 5 info far OETfi
NOVAK. T H Assistant Director for Operating Reactors 00/07/09
app
B00717035a iflnpiiration for amend to Licenses DPF1-53 i. DPR-49, revi slnfl
Paragraph 4 5 1 b d adding Pdragraph 4 5 I f to Tech Specs
re ECCS BUT /ei 1 lane e renuirement'.
LUNEVALL.rt E Daltimorc Gac R Elcctrtr Cc 00/07/14 3pp
— BO0717O333 Proposed Teih Specs re ECCS surveillance requ ir-ementsi
revising Paragraph 15! b !i adding Paragraph -1 5 1 f
» Baltimore Otis t. Electric Co BO/O7/J4 lp
0 Inspection reports, IE Dulletin5 !i correspondence
Foruariis update In uti 1 F10O4I7 i-esponie to IE Bulletin
79-Oln, "Environ Qual i Pica t ion of Clas« IE Equipment "
Evaluation of iivailable qiul I Fit atl on data for components
eipected to be i-ompJetEd hi) 300630
LDWDUALL.A E Salllmnre flao % Electrir Co BO/05/B7 SOOff
~~ 800709035^ Foru.trds eorreetml responsa to IE Bulletin 79-01D, "Environ
dual if ication OF Class IE Equipment, :l rp-olacingi incomplete
vcr&ion Foruiarded Eii| AE Lunttval] 300303 1 tr
ASHi H F Baltimore Oas !< Electric Co 80/03/05 2COpp
0007020120 Foritfarjs IE Info Notice BO-22. "Breakdowns In Contamination
Control Programs ' No written response requlreil
ORIER.fl H Region 1, Ph 1 1 HUB lp h la. Offlco aP the Director
HO/05/aa lp
BOOV010279 Foru.irdB IE fnfo notice HD-23, "Loss of Suction to Emergency
Feediuater Pump 5 " No written response rdquired
<JHIEB. D H Region I, Ph 1 1 n.dclp h la. Office of the uircctor
80/O5/2"? lp
BOO7iaOiOO Bosponds to IE Bulletin HO-1Q Revlow op nonradi oacti V» lyt
iocludeJ valve 1 irieups. leak ing valves t< points of contact
between radioactive t, nonrad 1 oact ive phases Addl
survBsl lance of ndtirad ioacli Ve sys uiill ba implemented
LUMOVALL. tt E Baltimore Gas Sc Electric Co 80/06/19 Jp
Q007020183 Forwards IE Circular BO-I5- "Lo6a of Reactor Coolant Punp
Cooling E< Natural Circulation Co old own " No written respariVB
GRIEff, B H Re
HO/Oi/aO lp
on 1, Philadelphia. Office of the Director
BOD71&0&Q9 Foruards 1C Circular 00-14' "Radioactive Contamination of
Plant DamlnDral i led Uatsr gys !< Resultant Internal
Contamination of Personnel " No written rBEponse required
GF[IER,fl H Region I. Philadelphia. Office of the Director
flO/06/24 lp
BOO7S1O171 Foruards IE Info Notice BO-24, "Lou Level Raduasl* Burial
Criteria " Ho Lintten response required
CRIER. B H
Rngjon 1. Philadelphia, Office of the Director
If
B007230Q9A Forwards IE Bulletin 30-16. "Potential Misapplication of
Rasemuuiit Inc Models 1151 Si 1)52 Pressure Transmitters
H/Either A or D Output Codes " Written response required
IE Circular BO-16 also enc 1 No written reaponae required
GFIIER.n H Region 1> Philadelphia, Office of the Director
BO/O-fc/37 2p p
BOO? 35 0642 Corrects 000601 response to IE Bulletin 80-03 Operating
experience has shown that even if reactor coolant drain tank
la pumped tn max flam rate, tank pressure remains greater
than atmospheric pressure
LUNuVALL.A E Baltimore Qas f Electric Co BO/Oi/27 Spp
BO 07 J 00 228 Submits info re fluid head design penetration connection*
or other designs ui/containmBnt boundary butt uieldn betynen
ileeve It process piping, per IE Bulletin BO-OB
4.UNDVALL,fl E Baltimore Sas & Electric Co 90/O7/03 Sf P
BQQ7Z1D044 Submits status of extensive survey program initiated in
response to IE Dinllntin BO- 11 Accounts for half of masonry
ualls requiring insp Remaining items uill be covered in
final Tejit to lie submitted after completion of surveys
LUMDVALL, A E Baltimore uas tt Electric Co 80/07/03 32pp
8007I7OI11 Flsspunds to (E Bulletin uO~O5. "Vat uum ConS I tion Resultino
in Damage to Chf-mical Vol Control Sgfi 1CVC5) Holdup Tanks "
Continued oper.ition. even during intorun period of
nitrogen ^ys srlprjuit mod, JWB ti f i et far listed reasons
LUKOWt-L.A E Baltimore Gas J, Electric Co CO/OA/04 Spf
8007310374 Responds to IE Bulletin 8D-QB Each unit cnntaini five
penetrations u/fluad head design Penetrations N-stamped par
requirements oP Paragraph N-153 of AS HE Code, Sn tion TII>
Bummar 1979
LUNDVALL.A E Pacific Bfts I, Electric Co BO/07/03 4pp
B007210211 Forwards JE Insp Repts 50-117/HO-05 «. 50-316/30-05 On
800407-30 Mo nnntumpi lanco noted
DRUMMER. E J Firm on 1. Philadelphia, fluac tor Operations Nuclear
Support Ihanch fIO/0^/O4 Spp
R Periodic operating reports & related correspnndenci
B007O1O3B9 Foruards monthly operating rept for May 1*7BO
MEREOM, S D Baltimore Gas & Electric Co BO/06/13 lp
6007210^47 IE Jnsp Flcpt? SO- T17/BO 05 ti EO-318/BQ-Q5 on 8001O7-3D Mo
noncomp 1 inncH noted Major areas incpecteil contiot room Ii
accei5ible (.iirtiona of auxiliary turbine svr I, Intake bldgn.
radiation orotpttion ti physical security
flFlCHlTZEL.fl Rpumn 1, Phil.idelpli is, Office of the IHractor
IICCflDE, E C Htgion 1. Phi lode 1 ph ifl, Doattor Operatidrs Nuclear
Support Branch tfO/OS/aO KOpp
— B007010393 Monthly operating rept for May 1900
HER SON, B D Baltimore Bas & Electric Co BO/Oi/12 9pp.
B007220351 ForuiaTds monthly operating repts for June 1900
MEHSDH, & D Baltimore Oas & Electric Co BO/O7/11 lp
Foruards IE Info Uutitn RO-26, "Evaluation of Contractor
Oh Program's ' Mil HIT it ten rpi.ponse required
ORlER.fl H Region 1. Phi 1 arfelph i ,1, Office of the Oirector
&0/O6/10 lp
— BOD7320353 Monthlij oaeratitig repta for June 19BO
MER50N.S fl Daltimare Oas & Elsctric Co 80/07/19
S Reportaale occurrences. LERs !i related correspondence
IBpp
ForuaTrts IE IrtPn Notice BO-S7. "Degrailatlon of Reactor
Coolant Pump Stuo-. " No spitriftc .jction or responsi?
req.i>lvei
CB1EFI.B H Tiegiau i. Pbijnd el phnri. Office of the Director
BO/Ofi/11 lp
0001340313 PNO*I-SO-3d on 600307, licensee reported via hot Una that
small fire occurred in riiesel generator Room 31 Fire
ei tingui shed in one minute Caused by Fuel ail accumulation
In eihsu&t manifold
BRIOOS, L , MCCADE.E . DRUNNER, E Region 1. Philadelphia, Offltr of
the Dlrettor BO/O3/O7 lp
DOCKETED ITEMS
141
rds LER BQ-03Q/O3L-O
Baltimore Gas (• Elect
Co BO/07/1B
24O15-3 LEfl HO-030/03L-O on BOOA1S, primary samp 1 E valve 1 CV-B1A7
dieated intermediate position *< fully shut position could
t be verified Cause cannot ba determined by remote mean*
tractive- action to be perf arme-il during shutdown
VI5.S M , RIZZO.P 0 Baltimore Qas & Electric Co BO/07/1B
D331 RO BO -33 on 000733, charg ing pumps 25.23 !> 24 mere placed
of svc For mechanical reasons. 1 saving charging pump 51
•mirgencij power Caused by a per -Him- Failure Co vorify
tig-related ays out of BVC Correc-tivB action Forthcoming
ELL.L B Baltimore 835 & Electric Co 80/O7/24 if
90-330 THREE MILE ISLAND NUCLEAR STATION. UNIT 2
uritg> medical, emergency *< Pi re protection plans
O0i3 Forwards ravised Pages 1 — 1^ Si noui Pago I4a for propose*
10CFR5O "Fire Protection Program for Nuclear Power
t» Operating Prior to 7901O1, " transmitted by NHC BQOS19
Pag* I4a not enc 1
NHUTi l> Q Division Of Licensing BO/05/53 73pp
0330 Faruards Revision AD of TMI modified amended physical
Pitil plan Plan withheld <ref 10CFR? 790)
EIN.J Q Metropolitan Edinon Co BO/06/27 lp
B0070aot)Bt. PrnpciBi'd findings «f fait *, cmic lusifun* of 1 <iu lesponding la
ASLAD questions on I3attB]|p i t>ji t Findinys .iro .iiloptcd by
Tm-*)/Peaclibattnm Int irrvenor 5 & Ecology At t Inn UrijB-i
suspension of ClLs Ocrti Ficittc uf £3vc end
KCPPdRD. C fciwivonmrnta] Coalition un, NIK 1 a.iv Power EIO/O6/1R
B007HOO7!) FnmJ L onlention* cuppl prnont ing petition to mtu
flmimd proceeding ftlleffes iiidd aquae ij ur RCS prnt.iun
Provi-ainnc re neutron monitoring i\\\ trumeii I .it i nil ai «
in.BUffic:tcnt tu jiri.itect public (.BrtiPicsto oP ilvc enc^
SIIOLUViS C Affiliatinn UnVnuiun fSQ/QfiJ If >[.|i
80070BOOAfa FtBtpunse' lu ABLrtD rec|Oi".t r
J&tision rejecting deficient g i e cur
radon releases (• jmounb of U Fuel f->n
decision re cnrr c-l<it ion tnw>t be ^dca
CftPLAN.R Ecolngij Action gF Osuego
Dnficieixij 1 Urges lev
elatiun lio-twei'ii U mine
tioi) af Poi-kniE
B0070BOO4S PropDBDd findings oF fact unJnrsina Citiiimi for Qaf«
Environ filing re radiatimi Eourre torms from XI mininu ft
millliiB FlojEclE Porttna rdtinriale !' urges d Gv-o 1 opmuTit of
further evidence re Pfilluro mechiini BAIH ft human Faitiiro
CAPLflNi R Ecology Action of1 LHuogu
0007070373 Suppl lo 000313 renuBUt POT hudrlng r& projiosBd chanoe to
Tsch Bp.ttct.in reply to NflC (ID04D4 rospon-se BpuclficB
interest t, standing ti clariFie'S aapufto of pror eeil ing in
LihicFi intervention is Bought Cmrti f 1 1 nte of Ivr one 1
OOHNBRUD,J D Envt ronmcn tji 1 Coalition un Nuclear Power
iaPP
€fr67 For-ufai-ds State of PA author i lation foi> open burning to train
f igh ter-a
FIN, J O Metropolitan Edison Co 8O/Q7/11 Spp
0533 Foruards revised fire protection program p Ian. rep lac ing
lous plan submitted Apr I? 77
EIH, JO htetropalitan Edison Co BO/07/11 lp
2H0355 Rpvioed Fire protectlnn program plan
Metropolitan Edison Co QO/O7/J1 8pp
H007O70?76 Petition to intorvenp 10 Conmisiion RODilH mBmnranilum !.
oi-der Allegoa tliat utll is inept at liGntlliiig nuclcnr rejjrtoi'
6 controlling <. iint-iii nmunt writing
LEWIS. M J Affiliation Unlmoujn BO/Oft/Jt 2pp
B007QPOOQ7 Motion baforo DC Court of Appualt requuslinj .irjisraen t (•
hnnrina on pnnifini) £100633 & 24 motions for review of BOO/itS
orders to aatinfij notice i B-quii'pmont llvitfonce -tv/i 1 1 ah IB
Certificate of Svc ent 1 Helatitd curt-i>apnnd»nci'
BHOLLY, S AtfiliflUon Unknown BHFCHANi I) P ShonnaniB P
3pp
0713 InfpT-mB that during site/general emergencij, NRC personnel
nanitoring plant evaluations are to rcpt to nnsite NRC
Iflr camples op observation ctr Accountability uiill be
isjilithod there & results provided
INfi.J T TMI Program Office BO/07/13 lp
B0071QD24Q Renuunts thot HltC cute ilofpito lit BOOfal? mtinui-anduni tt urdur
by allowing 6ncuQ.li time fur lilijjnnla to neel oilrnijii slraUve
rsmedies bpforv ventinp WRC should lool Into various
objBction-9 liQforo proceeding u/ntuj furlhor artinn
LEWIS, M 1 Affiliation Unit noun £30/06/24 jBp
udicatory corrvipondenc a
<0074 Urges R Hayhurst to -run pond to 800429 itr re allegad
H4 Flight 170 over plant Answer needed to avoid issuance
ubpoena to compel
IDLER, L J Hearing Branch 1 BO/06/06 lp
OO&O Forcrards Director's 000^13 decision under 10CFH2 206 (.
.ted Fa notice denyinfl 790SO9 petition that Commission
aro EIS prior to authorizing venting of radioactive
|> From reactor bldg
OW,H R Office of Nucleai- Ro-actnr Regulation, Dlrsctor
lp
'140O6& Notice of Uauance of Director's detiaion under 10CFH2 20A
mging Antinuclear Oroup He-prosBnt ing York ?<?OB09 petition
iat Commission prepare EIS prior to venting of radioactive
UBS Pron reactor bldg
sBEiE O Office of Nuclear (t sac tor Regulation, Director
1/0&/13 lp
'I4QO71 Director's decision under 10CfH2 B06 denying Antinuclear
•sup ReprBSBiiting York 7900O9 petition that CommlBaion
HUB EIS prior to author-it ing venting of radioactive gase*
•an rea c tor b Idg
*SE.E O Offic» of Nuclear- Reactor Regulation. Director
1/O6/13 Spp
JO53O Foruardl Federal Republic of Germany energy ti environ
jarch reft* "Radiatior, Expoeufa Due To Venting TMI-3,
.tor Dldg Atmosphers" duo to concBrn re B00612 order for
lorarij mod of license to vent radioactive matl
ER.R Affiliation Unhnoun BO/O6/16 lp
rOSOSS-1 "FJartiatlor, Exposure Due To Venting TMI-2 RBflltor Bldg
I mo B p h B r o "
TANKS. D . TEUFEL.D QBrmany. Fcdfral Republic of BQ/06/1B,
loruiarils Comml BI i un HOOnH? rnDmor jindum f. order cnntainlnn
decisions on UCB 7ROTOJ petition for recons* iloi-ntl nn of
7S0413 memnroniluin fc ctrdor UCS 771)04 petition aou-ghl action
TV firo prntiKbion fur el oc trl c ill eflbli"B
EI8ENHUT. B t! Division of Licensing BO/O6/an fl9pp
60-07020402 Hottort tu move B00707 pirheji ing conPorulu e to uih of 000/2IJ
LtcensEH arrangHd 90070V mi-pling ui/pt-ti t mnertt Oliolly J,
toch« tad during ulin-ti mlmji li ( i t nt ion 01 1 1 trai na 1 1 on nf
lsuu*i re CIL amend maij take (ilntp 'orliflcnl-e of five une 1
TRCIWnKIDOC.G f Mil tropo 1 1 tnn Edmoiv Co TROHUH1DQE. 0 I" fihnw.
Plttlnanr Potti (. Trouibridgo ttO/Oii/Pfi 4pp
B 0070 EO 621 RfEponno in uppoeition to Mil [luugliiu tiOOij24 Itr i-oqnoBtt i*u
hearing re CnrnmlBalon 00061^ ui dor Tor t&mpor.Try mod of 111
Order reflects taruful cnnainlerat: 101, of ret ord including
puulic comments W/Duuglat Itr-B T, t'cr tlf i cale nf 3vc
TRDHnftlDOC.O F M»lropolit«n CiUoon Co IHOHl)|HUaE, 0 F ntiaw.
Pittman. Potts !. Troubridi|a IIO/Oi/t'6 ipp
B00707OaiJ Forwards NrtC B006Hft order dor,<|lna inlei vflnora t3C Bholly.
Pttopla Against Nuclear Energy !« Nnu&erry Touinahlii TMI
9 to* ring Committee B0063J joint motion tar retonnidBrii t Lcin
of ci,i-flo-as
BNVDER.P J TMI Pronram Office OO/OA/nfi Ipp
Q007020&94 RBquests For aii judi eatery hoaplng vo Commiaalnn BOOMS order
•mentflng OL llrjps that un rodi tiai t ive dLmotphuv* VDiiting lie
allouiBd until Lomplebiort of lipnrlnj &tutOG iiitoroit t
sugjpst* B FpnnkD.J Oaijon f. J l.aar. a-, uitnuases
6HOU.Y.S < HOBSLCn. D C Aflilt^tion Unhniibin «ll/Ofi/P7 I0(ip
BOOV070337 Motmii beForo MB Cc.ur I ti F Appeals fnr nCpCase OO-lfaVS,
renuesting en I, ant rehearing on fa tiluinon, ' f)UQt,23 2-1
mnllonsit-o no-day jiriur i*o(ico for License aniHn<l
BHOLLY, B , HOaHLIiR.DE Af f I Uat l on Unknnun KHEFHAM, D P
Sheenan.Q P tSU/OA/a? 2pp
142
DOCKETED ITEMS
3007070333 Brief in lieu op pleading. in support of petitioners' motion
For an bane refiearing on BOO.Aai-S'l motions re BO061S OMTsn
Requests that NRC comply iii/statutory requi rement For 30-day
prior no tics to license amend Effectiveness
SHOLLV.S , HQSSLER, D E Affiliation UnVnaun RHEEHAN. D P
Shoenan.D P BO/Ot/37 13pp
6007 2306] 3 Petition & other pleadings before US Court of Appeals for
Third Circuit, seek ing declaratory judgement against NRC &
stay of 300612 orders authorliing atmospheric venting
Certificate of Svc oncl Related correspondence
SHE EH AN. D P . HAGEfl.R People Against Nuclear Energy BO/07/oa
B007O70365 Motion bo File DVCTSIIB brief in support of notion for in
bane rehearing Cuurl ruled on peti tl ones-e ' filings u/o
hearing argument re right to 30-dag |>i inr notice For
license amend
5HDLLY.E . HQSM.EH, D E Affiliation Unknown BHE EH A H, D P
Shu Email, D p BO/O6/S7 3pp
-8007070371 Motion requesting *ipedltiaus c on&idera tkon of petition for
reli earing Certificate of Svc end
SHOLLV.S , H05SLCH, D E Affiliation Unknown SHE EH AN. D P
Sheenan.D P
B007I605*M rtdvisos of considerable progress made during B00711 meeting
u/"ifcens?B & petitioners to intervene re advanced
tontBntions Addl BOOB IB meetings will be held & AELB uiill be
informed nf concrete results
OOLDBERO, B C, Hearing Branch S BO/O7/I5 Ip
a0071Q0411 Forward 5 NUREO-OS37 "Evaluation of Long-Term Po»t-Aec iflant
Core Coolinn of TMT-2, " jar B00711 negotiation session
Document sent to Intervonor Bliollij under separate cover tl/o
• ncl
SINGER. L N Hearing Branch B BO/07/15 Ip
BOO7O2Q633 Order denying licansBE motion to reacfimJule OL amend H00707
prehearing conference Parties may conPor f< submit proposals
to simplify or eliminate issues
WOLF, J F AtomU Safety and Licensing Board Panel 80/06/30 Spy
aOQ7OBOOOS Homnrdndu-tt 6 order advising that ftSLB has received further
de J egaticn. per Commission BOOblS order, for temporary llc&nse
mod , to rule upon hearing requests }i to conduct evldentiai-Lj
procendlnga on vsnling issue
WOLF.J F Atomic Safety and Licensing Board Panel BO/0&/30 Spp
B007070101 Notices of appearance! id OL amend proceeding Certificate of
Svc oncl
GOLBBERO.G C , SINGER, L N Hearing Branch 2 CHAMD1 Efi. L J Hearing
Branch 3 HO/07/01 3p[»
8007230579 Forwards Director's decision under 1OCFH3 306 (DD-QO-at)
denglng Antinuilear Croup Representing Vor* request for EIS
Si related FR notice
BNYDER.n j TMI Prooram Office 80VQ7/Oa app
— B0072B0593 Director's decision under 1OCFR3 306 denying ftnlinucleor
Group fle present ing York 790909 request for EIS prior tq
Venting of radioactive ga^ei from contfl inment b Idg Action
does not constitute Bignlficant environ Impact
DENTDN.ll R Office of Nuclear Reactor Regulation, Director,
BO/0&/I3 Ipp
8007030001 Proposed Findings of fart b conclusions of luu in farm of
memorandum & order affirming ASLD 7B0714 partial initial
decision !« advialTig tKat radon releaseE associated w/U funl
Eijcle are insignificant in -etriking coat/banof i t balance
BDRDEU1CR, B H Hearing Branch 4 BO/O7/03 SBpp
— 3007000003 Proposed corrections to BD02E6 transcript
BDRDENICK.D M Hearing Crunch -1 80/07/03 ?[>p
— SOO70BOOO& Motion to Inrlude Se minimus theory of health affects in UR
600703 Findings of fact Si conclusions of laui .presented in
form -oF momoTflndura Ji orifer Inclusion i> consistent u/ALAO-
509hALftn-51O tt ALAH-56S CDrtlficatB of Bvc «ncl
DaRDENIC. K lloaring Branch. 4 BQ/07/tn 7pp
B0070U0061 Respmiio in oppatltion tn KL Millor^HH Douglas t. portions of
BC Shollv S< RE HoBBlor requests for heaving re Commission
B0061H orders for temporaTij rood of HL W/Certlf i csto of Svc %
BOOA26 oppositiun to mat tan Tar injunction in Cflie 00-K.91
CHANDLER, 1- J Hearing Qranch 1 SINQER, L Hearing Branch 2
BQQ?32QQQb Memorandum !• order setting matters diicuned b decision!
made rfurino Harr i sburji PA B00707 prehearlng conferencn State
of PA jai-tl c ipat ion as interested partij granted Decision r*
standing (, acceptability of contention! held in abauance
PARIS.D H , SHON.F J . WOUF, J F Atomic Bafetg and Lieensinn Boar if
Panel. 80/07/18. 6pp
B00731012B Response in support of 'NRC 000703 plaading assirtlng
validity of Perkins record on radon releases from U mining
4 milling Object* to NRC position eliminating health sff»ct«
IISUBS From consldaratlon Supporting nswa articles encl
CAPLANiR Ecolbgv Action oF Oauego 00/07/16 13pp
6007350353 Forwards revised Pagei 7 b lib to licensees reply to propoiid
findings of Fact submitted by other parties filed B0071B
Unvlsei pages required to correct typographical errors
Svc list and
TRAVIESQ-DIAZ Bhaw, Pittman. Potts E< Trouibridge QO/07/B1 lOpp
flfl[J73io46? FoTuiards MS Hayhurst 000601 Ur re Johnsrud testimony on
behalf oF intervenore concerning 000124 Us Air Flight 170
Substance consistent ill/record Formal evidentiary
consideration need not be given
CHANDLER, L J Hearing Branch 1 BO/07/2B Ip
— 30073 104i9 Responds to telcon Si BQQ129 Itr re B0012') US Air Flight 170
Contrary to Lints 11 & 12 of hearing transcript. author did
nut op era IB Flight in question directly over facility on
600434
HAYHUflaT.R S Affiliation Unknown BO/06/01,
Ip
H Oonerai correspondent
fl(H)51i0109 Respond! to 800226 1 ti- re K Manges concerns 4bout venting
radioactiv* gatet from containment bldg Public comments are
bDlng soIitltBi! on NRC environ assessment t< rBcommondatlon*
Rrupton gas venting not permitted until final decision
HAMMERER, C Office of Congressional Affairs SO/04/01 Bpp
80072^0406 Ac li recUpt nf 800401 1 tr concerning posslbl* m*ani of
iFiiposlng of radioactive matl from facility NRC officials
uill review cDnurtenti Ltr end
HAMMEnaCHMIBT, J House of Rep 00/01/09 3pp
a0031602aa Flespomls to B0040B Itr re D MHier concerns about vtnting
krgpton gat from containment bldg Controlled ventino
ricommindBii by NRC environ a»s<ii*ment No venting permitted
P«niling review af pwhlie comments ti consequent decision
KAMMERER.C Office of Congressional Affairs 00/01/16 Ip
S00710023Q Order granting Etology Action of Dsuego motion to file
B00630 submission re geneTic radon issuo
BISHOP. C J Atnmic S«Feta and Lirenslng Appoal Panel 00/07/07
S0071703S7 Reaports-e in OjipP*i t ion to SC SJiolly B007Q3 motion for
temporary Euspension or deferral of c om t a i nrnen t ventlna
pending hearing AOL.D has no jurisdiction to consider is*uu
Urges prompt roferral to A3LAB If ASLD dectlneo denial
CHANDLER. L j Hearing Branch I OOLDBCflO, B C Hearing Branch 3
BO/07/0-7 I0p|>
B00320O319 RBSponis to 900331 1 tr re J Piccolo concerns about venting
krypton gas from containment bldg Controlled venting
recoflm»ni!«if by NRC environ aEEB»9ment No venting permitted
pending rvvleui of public comments & consequent decision
KArihEilEft, C OfPicfl of Congressional Affairs, BO/04/16 2pp
9003160124 Rffspnnrts to 90041H Itr re M McQarrltij interaat In venting
krypton from containment bldg No decision has been made to
permit venting Iff decision favorn venting, residents will be
given ample notice-
HAMMERER, C Office of Congressional Affairs 00/01/28, Ip
— BOQ7I70339 Aff, davit re alleged Urfc of ronalif oration bv NI1C oP dose
due to partjeulate radioiiuclidos cesium t, strontium No new
InPn presentud that would tpfld to thflngu In FE3 conclusions
W/b ib liograph idi tr CertifjcotB nf Svi
COH'OGL.F o Assistant Dirnctur For Radiation Protection
WELLER.R rt Asiistant uitector fnr Fn\fi ronracntal Toclino Iflnir
HO/O7/07 7oB
Respond* to B00419 Itr re constituent concern about Keniny
Commlssiiin "seci-ot Pindiniji " Commission racommendations on
Facility accident ntad» available to public In 791030 ropt to
Pretiiletit Carter List of supplementary documents encl
KftMrtERER.C OPPice of Cangresoional Affairs BO/04/EB 2pp
DOCKETED ITEMS
143
9OQ52Q0454 Ht*pondc to B00414 Itr re D Mossier comments on environ
aiseitnent of vontina radioactive gas from containment bldg
CoMient ulll he considered prior to any Commission decision
on vtnttn}
KAMHEREfl.C OFfica of Congressional Affairs 00/0-5/29 Ip
BQO7030373 ConFIrm* telcon re 113 Air Flight 170 on 000124 Forwards
Iranicrlpt eicerpt re J Johnsrud testimony about eKporienn
an flight into Harris&urg Intl Airport
CHANDLER. I. J Hearing Branch I SO/04/29 4pp
BOOSO70513 Request* repts by PA Medical Society t, Natl Cancer Iti-st.
tup Act of venting on public health & aaf ety, discussed during
BCO42-4 Kitting In Lebanon. PA
rCCKLINO, H AC Ft llation Unknown BO/O4/30 IP
BQQ*t2QSia Respond* to 800430 1 tr re constituent inquiry about
f«tllitt| NRC & EPA art monitoring plant releases Results of
EPA Monitoring made public twice ueeklg via local media NFtC
fiitfrfletuwn oft selected to facilitate public needs
, C Office of Congressional Affairs BO/05/08 3np
BOOt 120 43 7 H»«pond> to 900438 1 tr re constituents concerns about
vehtlng radioactive gases from containment bldg NRC 800315
• iwirirn a»»BinnBnt recommended that venting be permitted
Vintlng not permitted pending final decision
HAHHERER.C Office of Congressional Affairs 90/03/05 2pp
R«»ponds to 800416 Itr re AS Howard Itr urging that cleanup
•ctlvlti«i It Kr-H3 venting be conducted as rapidly as
potilble Decision on proposed venting will be made in near
future-
HAMMERERS Office of Congressional Affairs 00/09/05 Ip
HQ072301Q8 Responds to 800331 questions re possible financial Failure
»* uti 1. Flfianc 1 al failure provides grounds for immediate
revocation of license Contingency plans under development
NRC mill ensure protection of public health
AHEAHH6. J F, Conunlnion BO/05/07 2pp
BOO71BQ4&3 Responds to Itr postmarked BOO3H4 re nuclear power plants
NRC has Pound that action* to Improve safety, plant design b
• ittng tr health affects are necessary (< feasible Plants
found to be uitcafe uill nut be allowed to operate
KNTDN.H R Office of Nuclear Reactor Regulation, Director
BO/O5/QB Ip
3<X>7 190449 Respond* to Itr postmarked BOO327 re waste products of
nuclear OOWBT plants Presidential BOO21B message to Congress
T» rerfuaate ngt program end
DENTON.H R Office of Nuclear Reactor Regulation- Director
BOH571BOOi7 R*»pond» to encl B003O6 Itr to President Carter re nuelsar
poutr plants Presidential 791207 statement on Kemeny
CoMiftftian rep* on TM1-2 tc excerpts from NUREQ-O662 fc
wneo/cR-0130 end
IKNrON.H R Office of Nuclear Reactor Regulation. Director
BO/05/1H I6pp
SOO7IB0474 finpnndt to 790816 Itr to J Hendrie re nuclear power plants
b dlcpoial of raduaste Commissioners have approved licenses
fcr three nuclear plants to load fuel i< begin lout power
Lew It tor testing Presidential 6002 1H message encl
DENTDNiH R O'fic* of Nuclear Reactor Ragulatlon. Director
BO/03/12 App
— BOC7I6047B Urges govt financing of resaarch projects to resolve
nuclaar waste d Isposal. generate synthetic fuels tt nuclear
tutiatt
UHATLEViH E Chomtron Corp 79/09/16 app
B007160731 RB«pono5 to BO0317 Itr tn Pr«5)dent Carter re B003O9
editorial in Sari Diego Wnimi neuispaper Foruards e-icerpt on
nuclear power from "Second Natl Energy Plan." ft 771207
statement by President on Kemeriy Comrais&iDH Rapt on TH1
DEMTONjH R Office of Nutlear Reactor Regulation, Director
BO/05/15 12pp
B00731QQ>1i Reiponds ta 790316 Itr ro nuclear accidents before TM1
NUREG-0573 t< ricerpt'5 From 'Past Accident* in Nucleor
Reactor Facilities t. Nuclear Puiaer Plant Airborne
Radioactivity Releases. " ft "Precursor Events - TM1, " encl
QEMTON.H R Office of MuclBai ((toe tor Regulation. Director
90/05/15 36pp
— a007S10O47 ReqUBsts info re nuclear accidents Oefora TM1 incident
MDRIllSDN.J K Affiliation Unknouin 79/05/16 Ip
BOQ725OO&3 Responds *o BOOS1J Itr re effect! Qf radiation on children
Allowable radiation doses have been evaluated For all BJP
groups Acceptablig radiation dose t>tdi alloui For epecial
aen-sl tivi tij of young children
MULLED, D R Assistant: Director for Environments! Technology
BO/03/15 2pp
eo0716051fi Responds to 800139 Itr to President Carter re licensing
nuclear pouer plants. TMI accident created need for changes
in approach to eafebij Due to need for ppuer.NRC has granted
licenses far three units tu begin Inui level pouer testing
DENTDM.H R Ottite of Hucta&T Rnactor ReguUtloi), Director
80071B0353 Responds to 790109 Itr to President Carter re nuclear pouser
plants Addl contai nmetit structure as suggested not
considered n (-cot sarij or Feaelble State oF PA Emergency Hgt
Asency pamphlet on radiation incident* encl
DEHTONjH R Office nf Nuclear Redctor Regulation. Director
BO/05/19 llpp
8007210203 Responds to encl ROO<11B Itr tu President Carter re Indian
Point Facility Deitribea NRC efforts ta protect public
health at facilities currently operating or planned for
operation Village Voice news article end
DENTDNiH R Office of Nuclear Reactor Regulation. Director
80/OS/S1 lOpj
BOO7020059 R«»ponos to 79Q410 Itr to President Carter re safety of
nuclear plants Plants designed to prevent accidents through
presence of protective sij-si enginoercd safeti) featureK d
safety evaluations of sit« EuitabiJity D Lame Itr end
DENTDN, H B Office of Nuclear Reactor Regulation. Director
aO/OS/27 3pp
B007020c.55 Urfles NRC approval of venting at TMI
WILD. A A Affiliation Unlnnwn 30/06/04 I
60070 J 0216 Ack receipt of Westmoreland County Board of Supervisors'
300314 resolution No neiu nut! ear plants uill be licensed
until improved safety criteria developed Certain plants
allowed to operate for testing U/nncl
DENTON-H H OfPire of Hue 1 car Reactor Regulation, D1TflCtOT.
aO/04/Ojb lOpp
B0070aodi57 BugaBBts venting of krypton sa& into helium balloon
BONNEBDRM.M R Affiliation Unknown 80/04/06 Ip
Q0070B0677 Ac k receipt of Lancaster County Hoard oP Supervisors SOCKS'?
resolution Foruiard* President Carter 800312 iti«ssag« to
Congress re establishment of comprahGnsive radioactive
walte mgb jn-ografn
DEWTON.H R Offlctt of Nuclear Reactor ReoulHtiin. Direitnr
SO071B04-?a Responds to encl B00323 Itr to President Carter p«
trxaution* to prevent another nuclear accident such as TM1-
9 Effort* made to ensure public health & safety at all
nuclear planti. Unsafe plants uill not be allowed to operate
DEMTDM, H R. Office of Nuclear Reactor Regulation, Director
BO/09/13 9pp
at>07H(HB3 Discusses NRC pott-tt-n iictitins re iaf»ty at nuclear
plants in response' to ancl Richmond County, VA Board of
fiupervi Bars 800508 miolutian supporting use oP nuclear
pDuer President Carter B00212 nD<S9B<ge end
DENTON, H R Office of Nuclear ftsnctor Regulation, itirector
HO/OA/O6 9pp
9006180501 Oltcunes statu* of venting krypton from containment fUig in
r««pDn»e to B00416 Itr re A Donlcy concerns Public comments
ir» being solicited on environ assessment Krypton gas
vtntlng ni>t permitted pending final decision
RAHHERER.C Office of Congressional Affairs BO/OS/14 Ip.
BO071BD1BZ ttespondx to 800337 Itr to President Carter re nuclear BOU&J-
plant* tt nuclear uastel Carter 800213 message to Congrest li
791307 *t*t«m»nt on Kemeny Commission rept enc!
DEHTON.H It Dpfice of Nuclear Reactor Regulation, Director,
HO/05/1 A, llpp
H00717OS48 Respond* to enrl 000417 Itr to President Carter re nucltar
power plants Everij effort is being made to ensure public
health ti safety at all nuclear Facilities White Kouen prec-i
release fc encerpt from NUREO/CR-0130, Vol 1 »ncl
DENTOWIj H R Office &f Nuclear Reactor n&gulatlnn, DlrBCtor
BO/06/ 04. 22pp
B007210530 Forwards President Carter's statement on Ksmeny Commission
repl on TMI-2 tt Chapter a from second natl enaray plan per
B004S1 request for info on nuclear power
DENTON, H R Office of Nuclear Reactor Regulation. Director
144
DOCKETED ITEMS
B007O20229 Responds to B0040V Itr re KM Mocker concern about health
financial c list?, associated lu/facility accident t< cleanup
Portion of costa tuvered t>i) util insurance policy
DIRCKS, U J Office of the tiecutive Director for Operations
2pp
— B007O3Q237 Requests response to end HM Mocker 800402 re financial
costs associated up/facility accident t< cleanup
GBDDLJNG. U House of Rep 00/04/09 4pp
B0071IO316 Ack tptfipt of 80032? Itr oipiessing concern about proposed
Facility purging Decision on hou to I] eat remove Kr-05
contained in r putter b!dg not reached Review nf mechanism
far selecting panelists for adviiury panel underway
AHEAJiNE.JF Cnnimission RO/06/09 5pp
B007170SS1 Responds to encl 800416 Hi to President Carter re nuclear
pouer planks Every effort. IE being made to ensure public
health ti safety ot all nuclear power plants White House
press release 6 eirerpt from NURCG/CR-06&Q one I
DEHTON, H R Office of Nuclear Reactor Regulation, Director
BQ/Q6/Q9 7pp
a0071QO')5& Responds to S00521 Itr suggesting means of Improving nuclear
pouer plant safety Aci ident at TMI uias result of operators
overriding automatic actions r.ither than allowing too much
time far operator action
MATTBON. R J Division of Safety Technology 80/06/11 3pp
8007140233 FOJ1A request for info IB release of krypton gas into
atmosphere Prom facility
TRQMBETTA.R Affiliation Unknown 80/06/13 2pp
B0070105QB Requests that NRC re-evaluate decision to release Kr-85
gases Front Facility when alternative t-or storage ti isolation
From environ is available
WA5SERGACH, A £ Neu Vflr k Federation fnr Safe Energy flO/Qt./l3
2pp
90Q70EQ326 Eipresses concern re venting of krypton gas into environ
DISCUSSES health hazards of noble gases t> magnitude of
re) ease
DfiEY.K Affiliation Unknown aO/06/li 4pp
0007290047 rnruarris Commissioner biographies in response to 790456
request for infn on background op Commission No info
developed to indicate that sabotage contributed to
initiation of accident or in subsequent response
DENT ON i H R Office of Nuclear Redctnr Regulation, Director
90/06/17 ipp
— 8007390Q51 Forwards analysis of possible sabotage involved in TMI-2
accident Also requests info on professional background of
NRC stafP
SDXMAN.K A AFFi 1 iatl on tlnlnouiji 77/04/26 7pp
0007100143 Responds to 80031) Itr re radiation effects nn mutation rate
ti problem nF railuinste storage Lest than one mutation
expectod to result from effects, of TMI radiation to public
Compared u/60-770 from natural radiation sources
OENTDN. H R Dffue of Nuclear Heactor Regulation. Director
BO/06/ IB lp
600739006-1 Responds to BOOSSr1 1 ti re T11I-2 accident !, precautions to
prevent such accidents NRC action plan developed to provide
compretiBiis 1 vo basis for actions necessary to correct or
iraprovn regulation Chapter 7 horn MAC 1979 Annual ((opt enc 1
DENTON, H R Off ire of Nuclpar Reactor Regulation. Director
BO/06/1S 23|>ii
— B007290QA7 Requests info on TM1-H accident d NRC precautions talen to
prevent »u[.h iicudents Every ind iviiiiial has right to knou
tiiho IB looking out for American interests !t how well
HENRV. U Af filiation Unknoiun 80/09/23 lp
80070701 S3 Responds to B00313 reijiinot TOT info tin availability of
repts KBmenu; Commissinn Rept mrfy be purchased from OPtl
M/o end rents, nn security !• sabotage
ENYDEH. n j TMI Program Office BO/06/19 lp
8006300220 ftddl response to FOIA request for written communication*
between NRC & Congress since 800332 concerning facility
Forwards documents in App A
FELTONiO M Division of Rules and Records 00/06/20 3pp
-- 0007100433 Ack receipt of B00422 Itr Forwarding D QriPfith
correspondence No decision made re venting oP containment
bids
KAdMEREDiC Office of Congressional Affairs BO/03/O9 lp
Q007010304 Foruards 790720 order for license mod, NURES-QfiOQ. NUREQ-OS7B
tt NUREG-OSB5, in response to 800614 to Icon ri OL amend
proceeding W/D encls
CHANDLER, L J Hearing Branch 1 80/06/23 lp
8007020091 Responds to 800416 Itr re H Donley request for InPo about
800320 release of radioactive gases Alr-enhaust duct
effluent monitors did not detect radioactive mails above
normal plant release rates
DIRCK8.W J DfPice of the Executive Director for Operations
SO/06/23 lp
8007020653 Opposes krypton gas venting Newspaper article encl
KIENLE.D . lUENLE.K M . MCCARTNEY, R M Affiliation Unknown
80/06/23 lp
OO073B0129 Responds to 800615 Itr Decision to purge 37 . 000 Ci krypton
gas from containment bldg uas traumatic for all Forward*
final E1A & Commission memorandum tt order, for better
understanding of hou) & why decis'lon was made H/o encl
INQRAM.F L Office of Public Affairs 80/06/23 lp
— 8007300136 Requests decision to purge krypton gas be r«con»idBrnd
Policy reflects lad of responsibility
MOODY, C J Affiliation Unknown 80/06/13 3pp
8007140619 Add) FD1A request For all urltten communication* between
NRC tt Congress since 8003B2 concerning facility
FIDELL.E R LeBaeuF, Lamb, Leibij !, MacRae 80/06/24 Bpp
B007B90056 Discusses human Factors engineering issues associated U)/
accident Offers HVCH to NRC ui/aasurance that firm mill
provide key insight into conduct b application of post-
TMI human factors research
MAURO.C L Affiliation Unknown 80/06/H9 2pp
8007160145 Expresses appreciation to Boise InteragBncy Firn Ctr for
assistance during TMI-2 accident NRC benePitted Prom
excellent communication capabilities of agency Certificate
of appreciation encl M/o encl
WEEBB, B H Office of Inspection b Enforcement, Dffita of the
Director 80/06/36 IP
8007160155 Expresses appreciation to Dnise Interagency Fire Ctr for
assistance during TMI-2 accident NRC benefitted from
eicollent communication capabilities of agency Certificate
oP appreciation encl W/o encl
UEISB.B K Office oP Inspection & Enforcement, Office of the
Director 80/0&/26 lp
8007160160 Expresses appreciation to Boise Interagency Fire Ctr For
assistance during TMI-2 accident NRC benefited from
excellent communication capabilities of agency Certificate
of appreciation encl W/o encl
WEIBB.B H Office of Inspection & Enforcement, Office of the
Director 80/06./B6 lp
8007160167 Cipresses appreciation to Boise Interagency Fire Ctr for
assistance during TMI-B accident NRC taenefitted from
excellent communication capabilities of agency Certificate
of appreciation encl M/o encl
WEISB, B K Office of Inspection fc Enforcement, Office of the
Director BO/06/26 lp
6007160170 Eipresses appreciation to Boise Inttragvncy Fire Ctr for
assistance during TMl-a accident NRC beneFitted from
excellent communication capabilities of agency, Certi ficate
of appreciation encl W/o encl
WE I BE, B H Office of Inspection t- Enforcement, Office af the
Director BO/06/26 lp
— B0070/O1A3 Rem'psU price & avnilabilitu of repto on TMI sabotage event
analyses, pre ft post-accidpnt security status at TMI d
Kemontj Commisr.ion Rept
ROBERTS, VI J Affiliation Unknown 80/05/12 lp
BQ0723069A ForunrdB Oenpral Assembly of Bfcate of PA 800439 House
Hesnlulj-on iai Urijps rapid formulation by NRC of criteria
which ui i 11 be tib-ed as guidelines for decontamination of
facility Certificate Ot Hvr end
HEBUS.C F Pennsylvania, State nf 30/06/19 App
8D071A0183 Eipresses appreciation for assistance during TMI-S accident
NRC benefitted From eieclltmt communication capabilities: of
agency Certificate of appreciation encl H/o encl,
MEIS9,B H Office of Inspection t. Enforcement, Office of the
Director BO/06/H6 lp
DOCKETED ITEMS
145
Q0071BQ237 Forwards Section BOS. draft Addendum 3 to NUHEG-0662 re-
dSLontamination of TMI-3 reactor bid!? atmosphere NRC mill
use real-time environ It meteorol og ical data during
purging H/o end
FJNYDER.B J TMI Program Office BO/Ofe/2£ ip
— 9007180290 Requests copy of Addendum S to NUREQ-Oi62 re decontamination
at TMI-a reactor bldg atnioshjiore Inquires whether actual
Bite monitoring uas dono dauiniuind of Kr-95 releases
WABSERBACH.A E Affiliation Unknown BO/03/22 Ip
0007330229 Responds to BOO 3 09 Itr to President Carter re reliability of
const of nuclear pouer plants Purpose of NRC inep program Is
to assure adequate QA Fnruards eicerpts from NRC 1979 annual
rapt & Second Natl Energy Plan
DENTON.H H Office of Nuclear Reactor Regulation, Director
BO/06/36 Spp
8007230636 Responds to 790405 request for info re nuclear energy Due- to
TMI incident. HOC decided not to license new plants until
Improved safety criteria had been developed Eicerpt re
production of nuclear energy end
DEMTOHiH R Office of Nuclear Reactor Regulation Director
00/04/26 IQpp
— 0007830630 Request! info re nuclear energy tt process bij which energy is
(traduced
COLTiS Affiliation Un*noun 79/04/05 Ip
0007380122 Forwards President Carter statement on Kemenu, repti in
re*ponsB to end 800513 Itr to President Carter re safety
of nuclear power plants
DENTON.H R Office of Nuclear Raactur Regulation, Director
BO/06/36 3pp
B0072900S4 Responds to Q00512 Itr to President re status of nuclear
power plants President 791207 statement on Kinjeng Commission
r«pt on TNI encl Action plan developed to provide
comprehensive b lnt*9rotc<l ban. Is for future actions
DENTONj H R Office of Nuclear- Reactor Regulation' Director
BO/Oi/SA 4]i p
B007300013 Responds to 790405 Itr re nuclear power State of IL ban
seven nuclear pouier plants Reasons Por uie of nuclear power
plants in IL listed in encl eicerpl from util annual rept
President 791207 statement re Kemeny Commission Rept ene 1
DENTON.H R Office of Nucloar Reactor Regulation. Director
BO/Q6/26 2aPp
H0071SO1O7 Forwards micro Fiche Cilpij of "Logbook of Radiological
Data." in response to request H/a encl
SNYDER, D J TMI Program Df'nce BO/O7/Q3 Ip
— B0071SO110 Ac* rocwipt of "Lughont on Radiological Data "
Reproduction on many pageo is poor Requests micrt>f iche copy
BARLCY.B R Affiliation llnlnoun QO/OU/OS Ip
B007140333 RB-snmds to F01A request fur info rr release of krypton gas
Into atmosphere frnm ^acilitg Faruards. dECiimentt liateil in
App A W/D &ncU
F6LTQN, J M Division of Rul^s and Records BO/07/D3 2pp
Q0073B0182 ne-sponds to BO 0509 Itr c-ipreesing concern because no notice
to airman was issued in CD" June 1 1 on uj/rcleasc of Kr-95 on
B004S3 Assuming poor rap teor n! 09 i CH) : and I tlons. Lotal-
bodly eipasure uauld havt been 0 OflQ nullinrm
DENTOM. H R Office of Ntitlear Reactor FJogulation. Director
00/07/07 Ip
--8007HBO1SB Forwards FR Romano 000509 Itr rn venting Kr-B5 from reac bar
Conta inmsnt b Idg
SNVDER.O L Jlaglan I, Philadelphia, Of lice of the Director
BO/05/14 Ip
— 8007390195 Etpressps concern because no notice uas Issuei! to pilots
or patsongurs prior tn entering HarrlEbwrg aiTport arcs
notifying of danger of CDIIC ptitrated krypton (l-as
ROMANO.F K Affiliation Unknown 00/03/09 3pp
00073J0121 fle spend 5. tn 79O709 Itr to NRC re concerns about facility &
actions homo taken liy Cnncernod Cltucns of Uondoniferrij «HC
has ordered public hearing to determine uhether Unit 1
should bo operated Unit S feasibility ctudlcs are underlay
BNVDER.D J TH1 Pronrnm Office QO/0//09 Sfy
— B007210131 Eipresses appreciation fur 790A29 visit to Mlildletotiini PA
ConcernciJ Citllons of Londonderry, uhn have cDll&ctcd 750
signatures, ar-e digitated Lo clDbiny facility NflC status
repts WDiilif be at great benefit to nrra residents
BTREET, P A Affiliatinn Unknoun 79/07/09 2p p
800722O32Q flsspondfl to BOCM01 Itr ID Prnfiidunt Carter eipressing
concarns over financial impact i.s stockholder u/lltcnsee HRC
it concerned u/econotnic impact Respans ib i 1 i li/ is limited to
public health t< snFvtij
REID, R U Operating Roaftore DrnncN A GO/ 07/09 Epp
0007350070 Resnondn to eni.1 600&O4 Itr to President Carter re nuclear
•nargy Use of both coal & nuclear pouar necessary to free US
of ovBrflBpendencB on foreign oil President Carter 79IH07
prttt release fe energy plan encl
DENTON.H R Office of Nuclear Reactor Regulation. Director
BO/06/27 23pp
GQQ73aQ2Bi RuBpondB to encl QUO&OB Itr to PveBldnnt Carter eipross-lng
concern about TMI-H clennup imieess !, purge of Kr-05 in
reactor bldg Onst te NRC team ii monitoring c 1 Runup effort
NUREO-0673 (' NUnEO~t)A&3. Vol I.encl U/o cncU
DENTONi H R Office of Nut 1 par Rcact.nr flesu latton. Olructtir
BO/07/09 5pp
B007a500Bl Respond* to 790423 renuest for info ro nuclear energy
Radiation doson from pnuinr plants is small Fraction of dost
from natural environ sources (~£B eicnrpt & White House
0002 1H menage to congress encl
OENTON.H R Dfflca of Nuclenr Rnattor Regulation. Director
00/06/27 IBpp
80071 4 OS 16 Appeals djenlal of FOIA request for inPo concerning venting
at krypton gas from Facility
TROMBETTA, R Affiliation Untinc-un pO/06/30 Ip
8007140389 Responds to HOOiOD invoice k forwards insp fees For period
Of Mar 1979 to Mar IvBO prr 10CrR170 W/o encl
HERBEIN, J 0 Metropolitan Edison Co SO/07/03 2pj>
8007140616 Ratpondt to FOIA rnqunst for written communications between
NHC d Congress elnca 000322 concerning facilitu Forward*
itims listed in Documents 1 i S of App A in NRC BOOM6 Itr
b updated App A iD/otiplanatury nqtis
F6LTON, J M DivlDinn of Rules and Records S 0/07 /OB 9pp
B007HOi35 Determines that EJ Sternglaes tlOOlSS paper. "Infant
Mortality Changes Follouing THI Accident," in u/u sci"»tific
merit Cites examples of data manipulation Question* t'»
facility encl
OOLDBMITHi R Radiological Health Standards Branch 60/04/S9,
33pp
B007140657, "Analysi* of Infant Mortality Fnlloiolng TMI Atcldant
PA Dept of Health B0040S pre^s releasa encl
OOLDBMITH.R
4pp,
Radiological Health Standards Dranch
8007230393 flespontls to encl 1H s lo US l>ubl»i Hi-alth Svc h DDE re
research project on nuclear power plant*, in flay 1V77 HRC
adopted resident inap progtiJin No wattr leak uas impliL^tcd
in initiating accident at TM1-2 reactor
8NYDEH. D J TMI Prooram Uffirn BO/07/09 ipp
8007230393 neoponds to 790514 Itr to F RDft IP info about TMI-2 accident
Plant uas never in danger at blowing up bacau&e no amjgen
cauld have accumu l.ltu'-d in hijdi'ogt/n liuhble un-der Diluting
cunditicns Acc-tde-nl, f.iuscd by hunirin !< mechanical Errors.
BNYDER.B J TMI Program Ufflco B&tmjQ'} fapp
B00723031I Responds lo flncl 790<1Pa Itr to President Carter r« TM1-E
accident Utll cut, tamer S LJJ 1 1 not have to piiij for any jlamag*s
or for restoration of facility Ciiatomers yi 1 1 1 lioue ver, pag
costs associated w/purchaslnfl replacemifnt pnwBr
HNVDER. B J TMI Proorain Offieo EluYO7/W 4pp
Q007B7003S Respflnds to 800430 llr to MR Dented requesting two medical
records HWE6-Qt*b2, "Final Fnvii-un AtaouEinert for
Decontflmlnalion of TMI-S Reactor Dido At4nospriere. " "Lou
Leval Radiation" t- PA Medical Society rapt end W/o encl
SNYDEfl.n 0 TMI Pronratn OFFIce 00/07/09 2pp
8007300006 ReEjionris to Itr IB aciidunt at 1MI -B Putiliu hearings will be
conducted to determine uliethei Unit 1 Gli-ould lie (ifierated t.
under what conditions LlccnMie hnu not «uliinjtled proposal
for overall plant recovnry tor Unit B
8NVDER.D J TMI Program Office Hd/07/0? Slip
B007140IS)1 Hesponils l-o appual re dt-nidl of f-OJA request For Info rs
venting of hnjptnn gan Pi om ffliilitg NRC tomplfflt'd action
on Initial i pquusl by pruvidliig iluciments iu|ij lo tequcit on
B00703 No further action will be taken
FELTGN.J H Division of Rul Dt BTII! Rt'cords BO/C17/10 Ip
146
B0.0717O362 Comments un B00609 review of "Method For Calculating Doses
to Population from Xe-131 Releases Dunns Till Arcident "
Derivation values f< accuracy of calculations discussed
T. J E Affiliation UnVnoun 80/07/10 3pp
Responds to 790103 llr to President Carter re nucls
Foru-ard* President Carter 791207 statement on Kemeny
Commission rept on IHI t. e.cerpt from NHC 1979 annual rept
ra developmental of radiological emergency plant Ltr encl
DEN TON, H n Office of Nuclear Reactor Regulation. Director
BO/07/10 lOpp
BOO725O167 Responds to B005Q9 Itr re JB Hurst comments fc questions
about reactor bldg decontamination Hurst comments uere
considered in preparation nr final environ assessment Hurst
800411 Itr to me ent 1
DIRCKB, W J Qffiie nf the Hiecutivp Director for Operations
BO/O7/10 lp
J Insurance t. indemnity Information
B00711O011 FD1A request for all indemnity agreements, insurance
policies t. associated info between utiliNRC ti/or AEC re
facility
KEARNEY, B H Affiliation Unknown BQ/03/S<? Spp
B00711QQ09 Responds to FOIA request fur all Indemnity «graH«entt,
Insurance policies t< associated |nfo between util.NRC Sc/or
AEC re facility Forwards documents listed In App A
FELTDN. J n Division of Rules and Fiecords BO/Oi/23 7pp
--9007110017 Confirms that NELIA has bound Insurance Policy NF-220 at
limit of one million dollars issued to Met Ed.JCPbL t.
PEPCO covering facility Includes policy site description
QUATTI10CCH I . J Nuclear Energy Liability Insurance Association
73/15/06 lp
— BOO7350174 Canunints on environ assessment of reactor bldg
decontamination health impacts should be detormlnod by
ob jecti ve, independent data collected (< analyied over
substantial period of time Rnlated neus article enc 1
HURST, J D Affiliation Unknown flO/04/ll 4pp
B 0072 50 190 Responds to BOOS 14 Itr re D Mattson concerns about end
article in Pajton Herald on problems affecting farm animals
near facility Jssun under investigation Field studios
completed f< data being evaluated Rept to be issued soon
HAMMERER. C Office of Congressional Affairs SO/07/10 7pp
BO0721Q481 Questions uhy B00411 telegram does not appear in NUREQ-0&&3,
Vol S, environ assessment ie venting of krypton gas at
facility
CHDNS,L R Affiliation UnKnoun BO/07/14 lp
8007350062 Provides info on facility incident, in response to Q00633 Itr
re E Dobson inquiry Includes containment design strength (<
typical containment design pressure
D1RCHS.U J Office of the Cieirutive Diioctor for Operations
80/07/15 2pp
—8007230067 Requests
incident
QAUCUB.fl Senate
to E liobson inquiry about facility
BO/06/23 lp
BOO7330727 ftck reteipt of 500623 1 tr offering to help resolve snme of
human factors engineering issues raised by accident NRC has
organ! led neu Div nf Human Factors Safety to address
precisely theac issues
BUDNITZ.R J Offire of Nucleor Regulatory Research. Director
80/07/16 lp
B007110033 Eiecutod Amenil i to Indemnity Agr*om*nb B-6^, chang ing
license numbers
QALTZMAN, J Antitrust ic Indemnity Group HERBEIN, J 0
Metropolitan Edison Co BO/OS/S4 lp
0007110037 Amend B to Indemnity Agreement D-64. ehang ing •mount of
financial protection
Antitrust & Indemnity Group 77/05/01 2pp
— B007110040 Eiecuted Amend 1 to Indemnity Agreement D-6<t> mod i*y ing
prefatory language of Paragraph S. Article lire coune at
transportation NEL1A Policy (facility form) encl
QALTZMANiJ Antitrust b Indemnity Group HERDEIN. J 0
Metropolitan Edison Co 60/01/03 Spp
— B007110046 Endorsement a to NELIA Polity NP-330 deaionating annual
premium Declaration encl
* Nuclear Energy Liability Insurance Association 79/01/12 Spp
— B007110D51 Amend to Condition 4 endorsement to NELIA Policy NF-2BO,
Constitutes Endorsement S
HARRONE.J Nuclear Ennrgy Liability Insurance Asooclition
73/13/14 lp
-- -B007110032 Amend to NELIA Policy NF-S20 Con*titutes EndorstMnt 4
MARRONE.J Nuclear Energy Liability Insurance Association
73/13/14 2pp
— 0007110037 Amend to industry credit rating plan premium endorsement to
NELIA Policy NF-aaO Constitutes Enflorsemsnt 5
H An!) ONE, J Nuclear Energy Liability Insurance Association
73/12/14 Spp
8007300010 Desponds to 300321 Itr re BO 03 2 4 nemspojier article on
relaase of Kr-B'j gas from reactor bldg Purging of atmosphere
considered to be safest & most eipeditious way of effecting
dec ant ami nation
BNVDHR.D J 1«1 Program Office 80/07/16 3pp
— B007300012 Requtstu info re encl 800334 newspaper article on release of
Kr-83 gas from reactor bldg
MARBHALL.E hi York. PA HO/OS/Hl 2pp
— B007110060 Endorsement i, waiver of defenses endorsement <ENO). to NELIA
Policy NF-230
MARRONEiJ Nuclear Energy Liability Insurance Association
73/12/14 Bpp
— Q007110062 Endorsement 7 to supplementary endorsement waiver of
defenses for reactor const to NELIA Policy NF-H20
MARRONE.J Nuclear Energy Liability Insurance Association
73/12/14 lp
8007380106 Ack receipt of BOO604 Itr re purning TM1-2 containment
atmosphere Forwards NUREO-0673 H/o encl
DEHTOMiH R Office of Nuclear fleoctur Regulation, Director
ao/O7/ID lp
-B00711006B Amend to Insuring Agreement IV of NELIA Policy NF-220,
"Application of Policy " Constitutes Endorsement B
MARRONErJ Nuclear Energy Liability Insurance Association
73/12/14 lp
— SOQ72SOJ16 Requests boollot re qualitie', of krypton gas I. ail copies of
NUnEQ-0673
HUBER.JE Lancaster County, PA BO/06/04 lp
B 00730 03 69 Advises that Director's deci&inn re request that EIS be
prepared ynor to authoriiing venting of ratJioactlve gases
front reactor bldg is final NRC action in proceeding
Commission has token no action for review or to eltend lime
CH1LK-S J ClfFice of the Secretary nf the Commission BO/07/24
-9007110072 Amend to advance premium d std premium endorsement of NELIA
Policy NF-aEQ Constitutes Endorsement 1
MARHONE, J Nuclear Energy Liability Insurance Association
73/13/14 lp
-B007110077 Endoriefnent 10 to advance premium Ic ntd premium endorsement,
ill/changes in subscribing companies & proportionate liability
endorsement to NELIA Policy NF-220
HARRONE,J Nuclear Energy Liability Insurance Association
73/11/01 lp
I Financial information
3007150730 Confirms H0062A Voiron '. forwards graph illustrating market
price of General Public Ulils Corp romnion stock for period
vlan 1979 to mid-June 19BO
HDWBON.T 0 General Public Utilities - GPU Service Corp 80/06/B6
-80071100B4 Endorsement 1 1. assignment of interest in return premium !<
in reserve premium refund, to NELIA Policy NF-220
KARRQNE.J Nuclear Energy Liability Insurance Association
74/07/1S Spp
-S007110DQ9 Amend to Condition 4 endorsement to NELIA Policy NF-2SO
Constitutes Endorsement 12
MrtRRONE, J Nuclear Energy Liability Insurance Association
74/01/13 lp
DOCKETED ITEMS
147
-B007 1 1 OO9 1 Amend to Endorsement 10, advance premium !< std premium
endorsement of NELIA Polity NF-220 Constitutes Endorsement
13
HARRONC.J Nuclear Energy Liability Insurance Association
74/02/13 lp
-B007110093 Amend to address at NELIA endorsement to Policy NF-320
Constitutes Endorsement 14
MARRQNE.J Nuclear Energy Liability Insurance Association
74/03/13 tp
8007110173 Endorsement 31 to NELIA Policy NF-220, increaling limit of
1 lab 1 1 iti) en dors omen t
• Nuclear Energy Liability Insurance Association 77/05/06 lp
80O71I0176 Amend to Endorsement 39 to advance premium & std premium
endorsement to NELIA Policy NF-220 Constitutes Endorsement
32
BARDES, C R Nuclear Energy Liability Insurance Association
77/03/06 lp
-BOO711009B Endorsement 15 to NELIA Policy NF-SSO, increasing liability
limits
MARRONEiJ Nuclear Energy Liability Insurance Association
74/04/S6 lp
— B0071 1017B Amend to Endorsement 32 to advance premium !< std premium
endorsement to NELIA Policy NF-220 Constitutes Endorsement
33
BAFIDESi C R Nuclear Energy Liability Insurance Association
77/08/17 lp
-BOO71 10103 Amend to End or* tin en t 13 to advance premium & etd premiuit
endorsement of NELIA Policy NF-SSO Constitutes Endorsement
16
HARRQNE.J Nuclear Energy Liability Insurance Association
74/04/26 lp
-B007110201 Amend tn Endorsement 34 tn advance premium ti std premium
endorsement to NELIA Polity NF-22O Constitutes Endorsement
33
BARDE9.C R Nuclear Enei gy Liability Insurance Association
78/03/04 lp
-HO0711O1O7 Amend of std premium endorsement ui/ctionges in subscribing
companies & proportionate liability endorsement Constitutes
Endorsement 18
BARDEB.C R Nuclear Energy Liability Insurance Association
74/13/12 lp
-HQ071I020B Amend to advance premium & std premium endorsement t< amend
of Condition 4 endorsement to NELIA Policy NF-220
Constitutes Endorsement 36
BARDES. C R Nuclear Energy Liability Insurance Association
79/01/03 lp
B007110123 Amend of Condition 4 end or sen ant to NELIA Policy NF-220
Constitutes Endorsement 19
BARDE8.C R Nuclear Energy Liability Insurance Association
75/01/01 lp
BOO7110138 Endorsement 20 to NELIA Policy NF-220, increasing limit of
liability endorsement
BARDEB.C R Nuclear Energy Liability Insurance Association
78/03/31 lp
BQ07110133 Amend to Endorsement IB of advance premium b std premium
endorsement to NELIA Policy NF-220 Constitutes Endorsement
SI
BARDCByC, R Nuclear Energy Liability Insurance Association
73/03/31 lp
-8007110212 Amend to Endorsement 35 of advance premium t. std premium
endorsement to NELIA Policy NF-220 Constitutes Endorsement
37
BARDE8, C R Nuclear Energy Liability Insurance Association
79/01/16 lp
-B007110317 Endorsament 3B to NELIA Policy Nr-SPO. in/changes in
subscribing companies & proportionate liability endorsement
BARDEB.C R Nuclear Energy Liability Insurance Association
79/01/20 lp
-B00711023B Amend tn Insuring Agreemnnt 3 to NELIA Policy NF-220
Constitutes Endorsement 1
MARRONEi J Nuclear Energy Liability Insurance Association
73/12/14 lp
-BOQ7110138 Amend to Endorsement 17 of advance premium & ltd premium
endorsement to NELIA Policy NF-220 Constitutes Endorsement
22
BAflDES, C R Nuclaar Energy Liability Insurance Association
73/04/32 lp
— B007110224 Amend to address of NELIA endorsement to Policy NF-220
Constitutes Endorsement 3
MARRONEi J, Nuclear Energy Liability Insurance Association
73/12/14 lp
-8007110140 Endorsement 33 to advance premium b std premium endorsement
to NELIA Policy NF-220 in/changes in subscribing companies &
proportionate linc-lilty endorsement
BARDEB.C R Nuclear Energy Liability Insurance Association
79/12/01 lp
-BOO7110143 Amend to Endorsement 23 to advance premium d Btd premium
•mJortement of NELIA Policy NF-220 Conntltutes Endorsement
24.
GARDES, C R. Nut liar Energy Liability Insurance Association
7A/07/09 lp
-BOO7110147 Amend to Condition 3i insp b lutpenilom to NELIA Policy
NF-320. Constitutes Endorsement 36
BAflDES, C,R, Nuclear Energy Liability Insurant* Association
7A/12/13 lp
B007110043 Endorsement 1 to NELIA Policy EB-69
* Nuclear Energy Liability Insurance Association 7B/07/1B, lp
B0071B0404 Responds to B00613 request for add! info re compliance
bi/Financlal protection provisions of Atomic Energy Act
Forward* proposed Endorsements 43 t< 44 to NELIA Policy.
NF-230
HERDEIN.JO Metropolitan Edison Co BO/07/14 6pp
BOQ72209B4 Responds to NfiC 800613 1 tr re compliance in/financial
protection requirements Proposed endorsement provides mai
protection available from private sources Restoration of
limit of liability endorsement enc 1
HERHEIN.J 0 Metropolitan Edison Co BO/07/14 7pp
P Operating license stage documents h correspondence
-BO0711013i Endorsement 27 to waiver of defends endorsement (END) to
NELIA Policy NF-230 Constitutes Endor»«ment 27
BARDES, C. R. Nuclear Energy Liability Insurance Association
76/1 S/ 15 2pp.
-BOO71101B6 Amend to definition of nuclear energy haioril to NELIA
Policy NF-B20 Constitutes Endorsement SB
BARDES, C,R, Nuclear Energy Liabllitv Insurance Association
76/12/13 lp
-B007110160 Endorsement B7 to advance premium ti std premium endorsement
to NELIA Policy NP-320.
BARDESiC R Nuclear Energy Liability Insurance Association
74/12/31. 2pp
-8007110167 Amend to Condition 4 & amend in 1977 subscribing companies
proportionate liabitllty endorsement to NELIA Policy NF-B80
Conititutei Endorsement 30-
BARDEBi 0. R. Nuclear Energy LUbjHtu Insurance Aisociatlon
77/01/31 Hpp.
BD071700B3 Reports mitasured tritium concentrations above background
levels In grounduater monitoring wells around TMI-2 reactor
containment bldg
DENTDN.H R Office of Nuclear Reactor Regulation! Director
BECY-BO-tBl BO/01 /08 3pp
800717030V Requests timoly nvteui t> reoponsu to Pritiih Nuclear
Installations Inspectorate Pec 197? request for info re
THI-S reactor pressurlier mater level Inttrumentation
LAFLEURiJ D Office of Inlernatloniil Proflramu, Director, BO/04/2B
lp
B006090165 Forwards addl TMI-2 related requirements to operating
reactors Licensees requirementi. for TMI Action Plan Include
shift mannlng> licensing * taint & licensee d Illumination
of operating eiperlences tioBponte r?i|uested with In 30 days
E1BENHUT.D 0 Division of Licensing BO/03/07 IBOpp
8003190626 Responds to H0042I request for comments on "Environ
Assessment for Decontamination of TMI-2 Reactor nldg
Atmosphere, " Kryptiin jai should be vented Into atmosphere on
controlled basis u/suf Cicient advance notice to public
APPLEVARDiM H Harrisburg Hoop Hari isburg, PA 80/03/13 IP
148
BQOM30132 Ren.""** t ora-nents (in HUREG-Ob77, Potential ft
Toughness d Lam#l],ir Tearing on i'llrt Sttam Generutcr I,
Reactor Coolant Pum|j lupporte " Propiispd revieu proEedi.
implementation schedule pnc 1
EISENHUTi 0 G Division of Licensing HO/05/19 72pp
BQO70EQ534 Requests that silo discharge water composite sampling
frequent ma be changed to once every E?4-fi for continuous
composite samp 1 B t, onte per month Foi long-term composite
sample State of PA concurs lu/thange
HOVEV. 0 K Metropolitan Edison Co SO/Oi/33 2pp
1007110506 FOI A rpnui-st for 79Q4Q1 -BOO530 documents re boron luater
maintaining sub( I 1 1 1 1 dl I ty nf Facility tore !< protccsing !i
storage- of toriiTi maler refirreil to in util 800130*0229
^acumen ts
PAHEQN3, It rripnda of the Earth 80/05/30 Ip
BOO701Q460 Requests NRC conturrente in use of Mine Safety App I iances, Co
QMR-I d Scott TEDA-I) respiratory protettinn cannistero
against airborne radioactive mails Lists nddl precautions
for use nf cannister Related correspondence enc 1
HDVHV. 0 K Metropolitan Edison Co BO/06/26 3pp
3007IBOQ04 Discusses approval of rele.ioe uf Kr-B3 from icactor 61Ug
atmosphere hi; c nntral led purging |(LT ummonds autliori lation
For controlled purging Draft negative declaration re purging
& press release pnrl
DENTOH, H R OFFne (if Nuclear Rp..ctnr Regulation, Direttor
BECV-SO-132E BO/OB/IO llpp
— 80O71BOUD7 "Tina I ETnvirt
Reactor Dldg AtmospheT
« TMI Program Office
Available
<iiPiit for Decontamination of TMI-2
l NRC rapt Errata sheet ent 1
066<J VI SQ/05/31 104pp
B007100103 Forwards T Qerusliy B00624 1 tr re water disposal in sampling,
wells at fatilitij Baaed on 1 tr. water may fce placed in storm
water drainage sys after sampling for analysis Related
correspondence
COLLINS. J T TMI Program Dfdte BO/O6/2& 4pp
— 0Q07I001B6 Advises NRC that mater in sampling wells may be placed in
storm water drainage sys after sampling for analysis Water
dischargee Into on&ito drainage pond Related
correspondence
GERUSKY.T M Pennsylvania, State of HO/O6/24 Ip
— P007iaOO12 Corrpctinn no
components presently b
i> Office of tho Qetrp
BO/05/13 3pp
to SErY-BO-132C. adding Table 1 ro
used
nf the Commission &ECV-90-133C
B007O105fl7 RcspOTids bo 00043'' Itr impressing toncern re proposed Kr-93
ventino at TMI Method of Kr-BS removal not decided Foruiards
NURtQ-0662. "Final Environ Ar,sci.3ment far Decontaniination of
Till Unit 2 Reactor Dldg Atmnshpero U/o enc 1
AHErtRUE, J F InmmisEion 00/06/0'? 31pp
B007010355
corny 1 eted
REE!). S R
plans tu vent tii yp ton be suspended until UCS study
Ivanis, EUiitB of HO/03/39 2pp
BO 07 530099 Requests submitta! of pioposed Tech Spec changes providing
for redundancy in decay lieat remuval tapability in all modes
of ppevutltin tloricl Tech Sptcs lufiich would provide acceptable
resolution end For guiifanro
E1SFNHUT, D C, Division of llccmninD BO/06/1] hilpf
B007ISOO43 "Sfadintion Eipnsurc- Due to Venting TMi-3 Reactor Dldg
Atmosfi here "
FHANKC.fl , TEUFEL,!) Institute for Enprqy 1, Environmental ResHflrch
HBidolberg.M Our many BO/Ofc/12 Hipp
BO07140fll3 Buljmit!, iiifd detailing leak testing operation planSiper
GQ052<? tclcon Test to be performed H0070S-1B !. 07H5-OH01,
pondinn PaDETI Qpprnvnl
KLINOAMAN,fl M Meti-upoUtan Frtison Co 00/06/16 2pp
B007O10290 Forwards comments on rept by Inst for Energy & Environ
Research, lie 1 delb erg . f-ede-ral Republit of German ij
Major c ont 1 nsiiins are based on highly Inflated estimates
of radlunut lldt rnlcase^ 8upport3 NURF«-06i2 data
SNVDEH.B J TMI Program Office KREOER. U E Assistant Director for
Itadiation Proterlinn BO/06/3'J Qpp
0007110,293 ForuardB PA Dopt of Environ Resources QOQi24 Itr Water from
sampling mat; he placet) in storm sewer drainage ays
CQLLINfJ.J T TNI Pronram Office BO/06/26 4pp
8007H0478 Responds to F01A request for 790401-BOOS30 documents re
boron uator maintaining aubcritical i tu of facility core !c
processing J< storage nf boron water referred to in util
B00130-032B documents Forwards docuinenlE in App A
FELTON.J M Divinion of Rules and Records BO/06/24 3pp
— H0071104B9 Summariias diHCussions re roLommeiidatlnns concBrnlno boron
concentratinn in facility RGB Doron concentration should be
minimiiod duo to possible probluma u/valve sooting, JO
llerbein draft Itr end
NEU6ERHY,5 NRC Three Mile Island Task Force 79/00/31 7np
— 0007110493 "Criticality Analyses of Disrupted Core Models of TMI -S "
Eicerpts from "Technical Staff Analysis Rept on Alternative
liven t Sequences to President's Commission an Accident at
TMI," d GE Hulynuch 790501 Itr to util enc 1
HESFFALL.R H , HEST. J T , WHITEBIDE9, 0 E Oak Ridoe National
Laboratory 79/10/31 llBpp
— 00D7110S01 Discusses nontonservat IVB ref - Kcff of fMI-2 tors SB given
in special tan* f 01 CH ropt. "Evnluntion of Cloanop
Activities ot TMI " Ouestiono re TMI end
MAROTTA. C R Transportation llranch BO/01/01 6pp
000/100193 Approves B006HS Opnrating Procedure 210-1-4 02 re Unit 2
reactor blrtg atmosphere cleanup !< mode to hydrogen control
& containment bldg purge syo per BOQ612 order for temporary
mod of license
BNYDER, n J TMI Program Office
BO/06/K7 4pp
13007240150 Advises nf approval of proposed procedure & mod to *ye for
purging reactor bldg
BNVDEH.D J TMI Program Uffico BO/06/27 4PP
0007020399 Forum (It response to United Kingdom Nuclear Installations
Inspectorate renuest for terhnic.il info on reactor
prsssuriiov luateT level Inslrumcntation
BENTOWiH R Office of Miltlnar Reactoi Regulation. Director
BO/Ok/24 app
B0070703Q7 Responds to MfiC 900929 Itr re contaminated water In facility
containment uldg Clarifies iitil position on issues ro
submerged deminoral i ler sys.no lid uiastc disposal h
contingency plan for transfer ot untreated water
ARNDLD-R C Metropolitan Edlaon (,o BO/06/30 4pp
B0071 10?72 Foruarili Amond II to Litonse RPH-73, safety evaluation I,
notice of issunni-e & availability
BNVLER.B J Tfll ProQrani (Iffito B0/0t/2t 4pp
— G0071102BO Amenil 11 to Licenae DPR-73. perml tting bypass of interlocks
from reactor fildff BihauBt monlturs to dampers while purging
to reactor blilg atmasplipro
SNY&ER. B J TMI Program nfflcc BO/Od/24 3pp
— H007110396 Safety evaluation slippnrtlno Amend 11 to Licenso DPR-73
o QfFirc of fJuiloar Rentier Rogulation. Director 90/04/24 4pp
--8007I IOB9K Notice of Issuance t< nvailahi 1 1 ty of Amend 11 to License
DPR-73
SNVDER.D J TMI Program Office BO/06/31 2pp
8007070291 Responds to NRC B00507 Itr re TMI-2 related req
Items I A 1 a, I A3 I.I C 3, 1 1 K3F. Ill D31 currently
under review for TMI-1 Items for TMI-2 uiill be reported
under separata cover
O Metropolitan Edison Co BO/06/30 2pp
8007310299 FD1A request for info re mods to alarm oua In facility
reactor bldg venting sys
TRDMDETTA. If Affiliation Unknown BO/06/30 Spp
B007S201H9 RequBHta participation in retovory activities at site r«
contaminated uater Options presontlij involve discharge of
tritium into atmosphere No practical means of
decontaminating tri Hum
DENTON-H R Office of Nuclear Reactor Regulation. Director
BO/07/01 2pp
S007J70099 Comments qn BOO&1H rept. "Radiation Exposure Due to Venting
TMI-2 Reactor Oldu Atmosphere." by H Frank i< D TeuPel
DEVEA.J National Audut-orn ilotlpty. Central Midwest Reg Office
5pp
0007070320 Foruiards "EPICOR-II Uadiuasto 3ys Linoar Integrity f* Resin
Btabil ity> Prol iminary Evaluation. " '< info summariung
EPICOR-II operation an of 000601, in rcBponie to NRC 000819
Itr
HDVEV.O K Metropolitan Edison Co 8O/Q7/OS 13pp
DOCKETED ITEMS
149
— B007O70338 "EPICOR-II Radwaste By 5 Linear Integilty t. Resin Stability.
Prel Ijn i nary Evaluati on
» Metropolitan EdiBon Co
8O/07/Q1 3Spp
— B007I70452 "Piping t, Instrumentation Drawing Contaminated reodwater
Sys "
* Chem-Nucle.-ir Systems. ]HL SD/O1/I6 lp
8007080358 Forwards 800616 info Itr to PADER. i-equeat ing approval to
leak test two neiu tanks at TM1 per ETS 5 6
HERBEIN.J 0 Metropolitan Edison Co BO/07/03 3pP
8007110422 Submits evaluation of EPICOP. II waste In responEB to NRC
000913 Itr For ward t summary rept, layout of protective
barriers, data for 1 iners, evaluation of liners t< resins t
drawings W/o enct
HQVEY.Q K Metropolitan Edison Co 00/07/03 3pp
8007140352 Forwards info re EPICOH-I1 radwaste ays, in response to NH
800319 Itr Info includes summary rept of BUS. layout of
protective barriers re liner retention & discussion of
lltidrB Cc resins in use
HOVEV, 0 K Metropolitan Edison Co BO/O7/O2 49pp
S00714O419 Forwards inPo Itr submitted to PaDEH. requesting neui tank
laflk tn»t approval per ETB 3 6 3 4 S W/o nncl
HERHEIN-J 0 Metropolitan Ed icon Co BO/07/02 2pp
8QQ7S90001 Request* aubmittal of application for amend to license
consisting of Tech Spec changes & license conditions PWR
Mod Hi Tech Specs fc Model license conditions for TMI-2
Lessons Learned Category A items encl for guidance
EIBENHUT.D 0 Division of Licensing 80/07/02 69pp
--B007170A35 'Piping !, Instrumentation Diaiwino Monitoring Tank Sys "
o Chem-Nut lear Systems, Inr BO/Q1/1& 1 p
— B00717043B "Piping I, Instrumentation Drjming Offgas >. Liquid Separation
8ya "
* Chero-Nuclear BystemB Inc 80/01/lft lp
— 8007170461 "Ion Eichange Flow Sheet "
» Chem-Nucledr Systems, Inr 1)0/01/16 111
— 8007170466 "Piping t< Instrumentation Di-duimg 5i!/-A-03/IntermoBiati?
Sampling Sys "
* Chem-Nuclear Systems. Int (30/01/11 lp
— 8007170473 "General Layout Plun - !on EithangP Fquipment "
* Chem-Nuclear Syatams. Inc 80/O3/05 lp
— B00717047B "Util Flniu Diagram »
* Chem-Nuclpar Systems. Inc 79/1O/17 lp
— BOO717Q4B3 "Piping t, Instrumentation Drawing St!7-A~02/Betn Monitnrinfl
Manifold "
* Chem-Nucleiir Systems, Inn 00/01/07 lp
B007170373 Foruiards uater processing !< protessed water dispanition
plan far 19BO, Revision 3 t> 1981, Revi sion 1, supp 1 ementari)
to rept tubmitted BO0130 H/o plan Dversiie drawing. "TM1-
19BliW»ter Processing Schedule." In Central Files only
HOVEYiO K Mntropolltsn Edison Co 80/07/03 lp
9007 ISO 37 6 Submits suppl to BOO 130 water proccessing I procesBad mat or
dlBposltion plan for 19BO (Revision £> !< 1981 (Revision 1)
Qna ovarslie draining available in Central Files only
HOVEY.O K Metropolitan Edison Co BO/O7/O3 lp
SOO7170456 DilcusBes preparation of draft programmatic E3S for cleanup
& recovery activities at TMI Requests meeting between NRC.
ANL !t util to exchange technical info for input to EIS
ARNOLD, R C Metropolitan Edison Co 80/07/07 Hpp
8007230643 Responds to BOO 624 Itr re change In site discharges water
composite sampling frequencies Concurs id/recommendations to
raducu sampling frequency of RML-7 continuous composite
campling to 24 -ti period
COLLINS, J T TMI Program Officu 80/07/07 4pp
8007130479 Forwards recovery operations plan Change Request S re
auxiliary bldg & fuel handling bldg ventilation sya
survttillanca r«n.ulrem»nts
HOVEY.O K Metropolitan Edison Co SO/07/08 lp
— BOQ71SQ502 Tnch Bpoc Change Request 2 for auxiliary bldg & Fuel
handling bldg ventilation syn Flow rate surveillance testing
requirements, nuuiequent to supplementary vuntllation ays
r*moval from svc
<* Motropolltan Edison Co BO/O7/OB 4pp
B00717033B Forwards recovery operations plan Change Request 3 re
surveillance requirBments of auxiliary bldg ti fuel handling
taldg ventilation syi
HQVEY.O K Metropolitan Edison Co GO/07/OB 3pp
— B007170488 "Ion Fichangcr Support Assembly Drawing "
» fhem-Nuclear Systems. Inc 00/01/H3 lp
— B007170490 "Pipinn fc Instrumentfltion Drawing Dewatpring Station "
" Chcm-Nuclear Systems. Inr 80/03/11 lp
— B007170499 "Pump Remuval Instructions For Offgaa Pump !, Feed Pump
* Chem-Kuclear Hystomt, Inc 60/03/1S lp
-~B0071705Q2 "Pool Floor Fquipment Dase Lncalmns - Installation
Dimensions "
» Chnm-Nuclenr Sysiems. Inc DO/05/05 lp
--B00717050S "Prefilter IBS Micron "
* Chem-Nuclrar Systems, Int. BO/03/1S lp
—8007170511 "Final Filter 10 Micron "
# Chem-Nuclear Systems, Inr (JO/03/ IS lp
—8007170531 "Prefiiter/Finel FiHer - Details "
• Chem-Nucltar Systems, Int. BO/01/21 lp
— BOQ7170S33 "Inn Eichangor W/Agltfltor "
* Chem-Nuclear Systems. Inc UQ/01/J
— 8007170535 "General Arrangument Solidification Facility - THI
Recovery "
* Chem-Nucloar By c terns, Ini LiU/O.J/lO lp
B007170393 ReBpondB to NHC nOOflk'7 Itr re RCB mater chemistry J<
corrosion control Control of dissolved oiygen is maintainBd
bij hydrogen ovnrpreasuriiation In eiinurH tliat free hydrpgen
exists In solution to control mci'iiive Atnbunts of oiygen
HOVEY.O K Metropolitan EdlEon To BO/07/11 lp
— H00717O340 Proposed Tech Specs Pagoa 4 9-1 & 2 re BurveiHsnce
requirement! of auxiliary bldg t< fuel handling bldg
ventilation sys
» Metropolitan Ediaon Co 80/07/09 2pp
B007 150307 ReBpands to NRC/TMI-BO-B9 Itr rttd B00516, r»que«ting a
info r» submerged demineraliier BUS technical evaluation
rapt 8p*clflc reaponnei encl
HOVEY.O K Metropolitan Edison Co BO/ 07/09 BSpp
B0072103I33 Forwards ReLovery Clpci'ationt. Plan Change Rnqunst 4 ReituBBt
Permits operation of standby pressure inntrol SIJH w/loiuer
nitrogen bank pressure. to ovoid overprennun iiation nf
expDEci) decoy heat sys piping
HOVEY.O K MBtroppJitan Edison Co BO/07/1S 4pp
B007530333 Responds to FOIA rp((UBSt for "Submerged Ouminerali i er By 5
Tscfmital EvaliMtinn flefit " Pot-ument avatlalilp in DC PDR
FELTON.J M Diviuon of Rules and Rucnrdls BO/07/1S lp
B00717044S Forward* addl info PC submerged demlneral i mtian eye, pep
NRC BOOBli Itr Piping >< Instrumentation d general
«rr«nB*inent overiiie drawings encl
HOVEY.O H M»tropoU*Jin Edison Co 60/07/09 BBpp
— 8007170446 "Piping t< Instrumentation Drawing Supply Manifold Submerged
Ion Exchangers "
» Cham-Nuclear 9yst«m»j (nC. 00/01/16 lp
8007230443 Advises NBC of intention tn entei rnaclnr hldg during uH nf
0007 21 to verify inner doci opcralii li ty )i gather data on
radiation levels t< contaminalinn near door NRC will be
notified of sulibequent onlriwt
HOUEY.O K Metropolitan Fdison Co HO/O//13 3pp
8007310406 Forwards Attachment in.EPlmR 11 rn-.ni Irradiation data.
as promised in uti) BOft7G3 Hr Info uilthlielil
(ref tOCTHa 790)
HOVEY.O K Metropolitan Edison Co BO/07/16 2pp
150
DOCKETED ITEMS
BOQ7280023 Forwards list of TMI program oft itatf members to he used
for reF in futuru LOT rf>i(mn.dencB
CDLL1WS,H C ml Program Offite BQ/07/17 2pp
HOQ731O337 Comments on util BOCi702 Itr discussing preliminary
•Valuabiona o-f resins t. linori under postulated conditions
Requests specifirs of postulated uorst tase conditions t,
detailed projection! of duration of safe retention
COLLINS. 0 T TMI Program Office BO/07/1B 5pp
B007O103I3 Forwards IE Info Notice 00-23. "Loss of Suction to Emeroeney
Feedwater Pumps " No written response required
BRIER. B H Region 1, Philadelphia, Office of the Director
BO/05/29 Ip
B007210573 Forwards IE Info Notice 0Q~2fa. "Evaluation of Contractor
OA Programs " No written response required
CRIER. B H Region 1, Philadelphia. Office of the Director
80/06/10 Ip
BOQ7300S71 Comments on draf tj pr el i rr.) nary E1S on cleanup Hat of all
preparors t> qual 1 Picationt should be included Costs should
be presented in Hiiant i f i ed terms to intent possible,
including economic & environ costs
CHANDLER. L J Hearing Branch 1 BO/07/2? 3pp
000716034^ Forwards IE Info Notice 90-27, "Degradation at Roactor
Coolant Pump Btuds No specific action or response
required
OfllBB.B H Region 1. Philadelphia, Office of the Director
BO/06/11 Ip
BOO73I0336 Responds to utll BOO/13 Itr describing changes proposed tn
reactor bldg entry program follniulng reactor bidfl purge
Entry preparation-., are sati sf at tory NHC approves entry as
p lanne*
CDLUIN8, J T TMI Program Office BO/07/23 4pp
0007oa0715 Forwards IE Bulletin HO-13, "Possible LOBS of Emrroency
Notification Sy» <EN9) W/Lo»B of Offsite Power " Written
response required
GFtlEfl.DH Region 1. Philadelphia. Office of the Director
BO/06/ 1H Ip
0007310'13'tt Concurt in/use of orbisphere as method to obtain
reliable dissolved o«ugen values foi RC5 Concurrence
withheld1 re control of diaselved oujgen by hydrogen
overprB&surl latlon
COLLINS, J T TMI Program Office BO/07/22 4pp
B007020936 Forwards IE Circular 00-15, "Loss of Reactor Coolont Puiup
Cooling b Natural Circulation Cooldoufi " No written response
requirBd
OfilEH.B H Reaion 1. Philadelphia. Office of the Director
BO/06/20 Ip
80073QQ447 Adviaca of intent to purge r BBC tor bldg atmosphere on
routine basis Purge mill be conducted w/ProceiJure 2104-4 91.
using modified purge sijs Total weekly ialeases uill not
eiceed 73 Ci Hr-Q9
HOVEV.O K Metropolitan Edison Co 80/07/24 Ip
B007160708 Forwards IE Circular 80-14, "Radioactive Contamination of
Plant Demlneraliied Hater Sgs & Raaultant Internal
Contamination of Personnel " No written response required
ORIERiB H Region 1, Philadelphia, Office of tha Director
00/06/24 Ip
B00731oaS3 flesponds to FQIA renupil for info
facility reactor bldg venting sys ForuartfE
detailing Info subj to request
M Division of Rules and Recdrds
re mods to alarm sui In
document
BO/07/25 Ip
B007K1020a Forwards IE Info Notice BO-24. "Lou Level Raduntte Burial
Criteria " No written response required
ORIEfl.0 H Region 1. Philadelphia, Office of the Director
00/06/35 Ip
— COO731031O Destribcs preparation for & procedures used to purgi
from Facility reactor blilg atmosphere PurginQ continued
at various sys f 1 ou rates based on meteorological
conditions
* Commission 80/07/35- Zpp
n00731Qfl3"? Forwards "Trtl-2 nadiation Protection Plon. Revision 2.'
final NHC approval Revised plan sets forth radiation
protection policies !< phila&opnies of Het Ed t< General
Public Utils Curp radiological controls progrdm U/o end
ARNOLO.R C Metropolitan Ediaon Co 80/07/25 2pp
B007S30129 Forwards IE Bulletin BO-16, "Potential MiaappUcatlon of
Rosemount Inc Models 1131 ft 1132 Pressure Transmitters
M/Eithar A or D Output Codes " Written response required
IE Circular BO-16 aluo Bncl No written response required
OHIER.B H Region 1. Philadelphia. Office of the Director
BO/Oi./27 2pp
B0071A0431 Forwards ovaluation !- submittal schedule for all IE
bulletin responses per utll B00529 Itr & in response to NRC
800417 request Responses to IE Bulletins 77-10 t 80-09 end,
HOVEY.O K Metropolitan Edison Co 00/07/09 7pp
B007BB000V "NRC Plan tor Clodnup Operations at TMI Unit S "
» TMI Program Office NUflEQ-069a 30/07/31 25pp
0 Inspection repni ts, IE Bulletins & correspondence
8007220405 Forwards list of recovery mode surveillance procedures
reviewed b results per utll 800519 commitment Sufficient
administrative controls to nssurp compliance present in all
but 8P4303-M3
ftRNOLD.R C Metropolitan Edison Co SO/07/10 lOpp
9007100009 Forwards combined IE Insp Ropta 50-330/79-37 i. 30-ZB9/79-31
on 791023-1127 t< i"ot!ce of violation
QHlEir, D H RcnloTi 1. Philadelphia, Office of the Director
BO/01/09 3pp
— BOO71000IS Notue of violation from inip on 791023-1137
* Region 1, Phlladjjlphi j. Office of the Director 79/12/20 Ip
--B007100014 Combine^ IE Insp Ropts 30-320/79-29 t, 50-287/79-31 on
791023-1137 HonromplidniE noted failure to store t, control
licensed matin >n unrnttncted areas
WHITE. J fl . YUHAS, Q P , MCQAUQHY, R H Region 1, Philadelphia,
Office of the Director 79/12/20 lipp
0007100002 Forwards Watte Packaging Insp flept 150000^/90-04 on
BOO 107- IS No none limp 11 a nee noted
aHITH.O H Region 1. Phiiaiiel phia, Fuel Facility i< Materials 8afety
Branch BO/O3/a4 2p p
— a00710'0003 Uaste Pachagino Insp Rep t 1SOQOOHA/BO-04 on 800107-10 No
noncompl lance noted Major areai inupettcd waste shipments
for compliancB w/DOT * HRC regulation* including vehicle
placarding, package marking !< condition of packages
THDMAB, R C , PECK, C C Region 1, Philadelphia, Office of the
Director BQm H E Ftcgicn 1, Philadelphia, Fur) facility b
MaterioU Safety Branch 80/03/3S 7pp
600702O16I Forwards IE Info Nntice RO-22. "Breakdowns In Contamination
Control Programs " No uritten reEponse required
ORIER.D H Region I, PJiilfnltluliu- Office of the Director
90/05 /EB ]p
R Periodic operating reporti & related correspondence
B0070201B3 Foriuardfl TMI Program Ofc meekly status rept for uik of
B006 14-20
COLUNB.J T TR1 Program Office 80/06/23 &pp
B0071S0053 Foruarrfs status rept for uk of B00621-29
COLLINS.J T TMI Program Office BO/Q6/30 7pp
B0071B01oa Forwards statuo rept for uk of B00621-SB
COLLINS.J T TMI Program Office BO/Ofc/30, Bpp
0007170463 Forward* status rept for uk of 800629-0703
COLLIN0. J T TMl Program Office SO/07/07 7pp
80071BQ337 Foruard* TMI Program Ofc weekly status rept for uik sndlno
800709
CDLL1N8.J T TNI Program Office BO/07/07 20pp
B007290719 Forwarrffl status rept for uk of BQQ706-12
CDLL1NB.J T TMI Program Office 80/07/14 £,pp
B0072103B9 ForuiardB "TMl-a Recovoru Quarterly Prooress Rept, " for
period ending H00630 Rept available in Central Files only
HOvEYiQ K Metropolitan Edison Co SO/07/15 Ip
8007310136 Forwards meekly status rapt for BQ0713-19, Liquid effluents
from Unit 1, ruinated to Busquehannn River, euere within Tech
Spec limits No liquid effluents discharged from Unit 2,
COLLINS.J T TMI Program Office 80/07/21. Spp
DOCKETED ITEMS
151
B Rsportable occurrence*. LEfls & related correspondence
B00701Q434 Forwards LER BO-O20/O1L-0
HOVEYiO K Metropolitan Edison CD BO/06/S6 Ip
— 8007150519 LFR BO-023/03L-0 on 800603, boron concentration in boric acid
mil tan* found niceeding Teth Sjie-ct Caused bg evaporation
Prom use of temporary air spargoi inning apparatus Boron
solution diluted !/ regular tan* mner returned to svc
CHAPL1N.S D Metropolitan Edison La BO/07/03 2pp
— 80Q70104SB LER BO-O20/O1L-0 on B00522. during containment Entry-
violation of containment integrity occurred via bulkhead
makeup valve E Caused by procedural deficiencies Procedures
rOVt»Bd
CHAPLIN. B D Metropolitan Edison Co SO/06/26 flop
B007170S64 PNO-TMl-ao-03BB on 8007O9, purging of reactor bldg atmosphere
continued at various flow rati<, Mnmi>ut.irij shutdowns occurred
due to stack monitor filter changeouts
CONTE.R J , SHANDAKV. H H Region 1, Philadelphia, Office of the
Director COLI INfi, J T TM1 Program Office 90/07/O9 ipp
8007230207 PNd-TMI-BO-036 on B0062B, purg ing of reactor bldg is
ichoduled to start at B 00 Art
CONTE.R J . FABANQ.A Region 1, Philadelphia. Office of the
Director COLL1NB.J T TMI Program Office BO/06/S7 Ip
B007230201 PNO-TMI -80-037 at a OO AM on BOOiSB, pursing of reactor bldg
atmosphere UBS started Purge uas stopped after 4 minutes due
to high particulate alarms
CDNTEiR J , FASANO, A Rug ion 1. Philadelphia' Office of the
Director CDLL1NB, J T TMI Program Office BO/06/39 Ip
H0071A0333 Forwards LER BO-Q34/03L-0
HOVEV- 0 K Metropolitan Edison Co
— BOD71&0925 LEO BO-024/03L-0 on B00529, uh i 1 e in recoverg made of
operations! pressure transducer used to monitor RGB pressure
uaa isolated from RGB ui/o control room knowledge Caused by
deficient 8 DP Valve rtapened utithin Tech Bpnc action period
CHAPLIN, B D Metropolitan Edison Co BO/06/30 2pp
B007290214 PND-TMI-80-03B on B00629, purg Ing of reactor bldg atmosphere
was resumed To Increase sensitivity of stack monitor for
participates, add 1 instrumentation was installed
CONTE, B,J . FASANO, A Region 1. Phi ladelphia, Office of the
Director COLLINS.JT TMI Program Off ice 80/06/30 Ip
80072 SOB 31 PNO~TMI~BO-03BA on 800701, purg ing of reactor bldg atmosphere
continued at various fluin rates based on meteorological
condition* Momentarg shutdowns also occurred due to stack
monitor filter changeouts
CDNTE.R.J , FABANO.A Region 1. Philadelphia, Office of the
Dlractor COLLINS, J T TMI Program Office BO/07/Oi Ip
B0072S0237 PNO-TM1-BO-03BB on B00702, purging of rnactor bldg atmosphere
continued at various flou rates bused on meteorological
conditions Scheduled Bhutdoun lasting 5-h occurred for
eomputnr main*
CONTEiR J . FASANO, A Region 1, Philadelphia, Office of the
Director. COLLINS, J T TMI Program Office BO/07/02 Ip
8007170947 PNO-TMI-BQ-038C on 800703, purg ing of reactor bldg atmosphere
continued Shutdown occurred due to loss of sampl* pump for
effluent monitor. Replacement: pump uas installed d purging
resumed
CDNTE'R J > 8HANBAKY, M H Region 1, Phi ladelph i a, Office of the
Director CDLLlNBi J T TMI Program Office BO/07/03 Ip
B007170340 PNO-TM1-BO-03BE on B00707i purging of reactor bldg atmosphere
continued Momentary shutdowns occurred due to stack monitor
filter changeouts
CDNTE/R J , 3HANBAKY, M H, Regton 1, Philadelphia, Office of the
Director COLL1NB,J T TMI Program Office BO/07/07 Ip
B00716099i RO BO-27/1P' deluge valvo closed to praclud« actuation of
modified hydrogen purge filters t. reactor bldg purge exhaust
filter fire protection deluge Caused by omission of footnote
from Tech Bpscs allowing closing,
HOVEY.G K Metropolitan Edison Co BO/07/OB Ip
8007170033 PNQ-TMI-BO-03BF on B0070B. purging of reactor bldg atmosphere
continued At approx 6 20 AM, su» was Bhut dawn due to high
alarm on purge ays monitor noble gas channel Reason for
alarm is under review
CDNTEiR J > BHANBAKV, M M. Region li Phi ladelph id, Office of the
Director COLLINB, J T TMI Pronram Offic*. BO/07/OB, Ip
B007J30913 Foruiardn LER BO-QH&V03L-0
HOVEY, 0 K Metropolltati Edison Co
BO/07/09. Ip
B0072301SB PNS-I-BO-01S on 800709. 1 icon 6pe received telephone bomb
threat Licensee conduttod full stale cearcli u/negatlve
resul ts
BAILEY, Ft , MARTIM, U Region 1, Philadelphia, Office of the Director
80/07/09 Ip
B007I705S7 PNP-TM1-BO-O3BH on B00710. purgins of reactor faldg mas
shut doun at I 49 AM so that reactor bldg air samples could
be taken
CONTG.R J , SHANBAHV.M M Reuion I. Philadelphia, Office of the
Director COLLINS. J T TMI Program Office BO/07/10 Ip
8007330237 Part 31 rept re cracked Eti'am aencrator manway studs
Satisfactory operating experience forms. const 1 tote
reasonable basis for continued op»rstion while
investigations proceed
TAYLOR, J H nabcocl 1< WiUoi Co S0/o;/ll Spp
6007540303 PNB-TMI-BO-3B1 on B0071 1, pur gifig of reactor bldg atmosphere
continued until apprin 1O 00 AM Nhen purge sgs was ihutdouin
because llcenteu declared purge cumplete
CONTE.R J , 8HANBAHY.M M . CU1L1HB.J T Till Program Office
BO/07/11 Ip
0007340116 PMO-TMI-BO-040 on OQ07H., inner door for rpactor bldg
personnel airlnct 2 mas sucnsofuilg opuned Upon closure of
door. seal rings for iloor failed Icakuge trst
CONTEiR J , COLLINS. J T TMI ProDiam Office BO/07/16 If
B007330318 PNn-TMl-HO-040A on B00716, reac toi bldg personnel airlock
inner door fail it a seal leakage' tnt.t While inner door uas
open Radiation surveys were taken inside reactor bldg near
Inner door
CONT6, R J , FABANO, A N , CtlLLlNB, J T TMI Program Office 00/07/17
B007330434 RO BO-30/1P on S007I7. survni 1 lance testing of inner
personnel airloik containmoni donr indicated that leakage
past inner door seals exceeded Tech Spec limit Subsequent
survel llancp tpsting of outer door wai satisfattorg
HOVEY, 0 K Metropolitan fcdlson Co BO/07/17 Ip
B007230439 RO BO-29/1P on B007H, uih i 1 B performing surveillance
procedure 4303-M1A. Orsy balanic of plant illesel generator
failed to start Caused by problem u/100 speed suiiteh
Replacement parts have been ordered
HOVEY, 0 Metropolitan Edison Co BO/07/ IV 2pp
B007S90B11 Forwards LEFi BO-OP6/OJL-0
HQVEY, 0 K Metropolitan Edison Co
BO/07/ IR Ip
— B0071S0914 LEU BO-OfiQ/OaL,-Q on BOOAO7, reactor coolant inlet temp meter
on remote shutdown monitoring instrument p*nei found
inoperable Caused blj instrument failure. Replacement ordered
t( vo*tm*tor temporarily installed
CHAPLlN.fi.D Metropolitan Edison Co BO/07/07 2pp
— BQ07370817 LER 60-026/03L-0 on B0061fl. during recovery mods. Unit 3 fire
pump removed from «vc Unit 1 pump rtiitovered unaligned to
fire suppression header Cnu-,ed bg porftonnel error Procedures
reviseit to rpflrtt permnnont vnlvp lineup change
CHAPLIN.BD Metropolitan Edison Co 80/07/1B Spp
T Hearing transcripts on non-ant 1 trui.1 matters
S00703034S Transcript of 790B03 interview of D Stprnbprg in Bethesda,
MO Pp 1-B6
BTEfiNBERQ.D Hpgion 9, San KranviEio. Office of the Director
79/08/03 86pp
B007030334 Deposition of RW Hauiurd, of Qcnerol Public Utils.bg NfiC/TMl
Special Inquirg Qroup on 7909HS In Pnrsippang.N.I Pp 1-55
HEWARD.R W ' Qunetal Public UtiMtie-s - OPW acrvice Corp 79/09/35
SSpp
8007030343 Transtript of B00610 {.ontinuatjon of distussion of facilitg
venting in Washington, DC Pp !~23 Murninp suasion Related
draft memorandum & orriem ent 1
« Commisfiion BO/Ofc/10 43pp
B0071S0915 Forward* LER tio-OSS/OSL-O
HQVEY.O.K i Metropolitan Eili.Bor. Co
BO/07/O9 Ip,
7HOOOJ> Tra'iBinpt nf BOO61O innfei
tnporarif mod nf ) i L unse to a 1 ] ou r e-ac t nr bl-d g pur g
HLF. J > Atomic Safety and Lirepisirig Board Panel
Btropnlita-i Erlison Co CHANDLER. L J Hearing BTV
TRQWDfll D3E. S F
ch 1 B0/(j&/30
7140322 Transcript of 600707 prt hearing conference in Harr i sburg, PA
p I -as
Atonic Safety .ind Licensing Boarrf Panel 3D/O//O7 B7pp
71BQ041 Trantrnpr of ROO707 puhlif meeting in Wa tiling ton. DC to
liciiES TM1 action p tan. Chapter V Pp 1-37 Supporting mat]
ucl
CommisBion BO/07/O7 5Bpp
Transcript n* BOD/OB [>r eh earing conforencs in Harris
A Pp 1-34
rtturolc Safety rind Litenojng Board Panel BO/07/OQ Sip p
DOCKET 30-321 EDWIN I HATCH NUCLEfiR PLANT. UN I T 1
F Se-curnty, medical, emergency l« fire protection plan-s
B00702O1EB Forwards request for arldl info re 800530 revised guard
training l< qua 1 i f 1 t at i nn plan Enc 1 withheld
(rep lOCFUa 7TO)
OeiDiR 11 Operating Rest tors Branch 4 BO/Q&/19 2pp
BQO7330104 Bequests participation in, study of people-related problems
In nuclear safuguarils Study involves collection of d«ta on
litense* security forces I: practices NRG wishes to interview
security ragt pennnncl at Facilities
E1SENHUT, D Q Division of Licensing 90/07^11 2pp
BOO73B05\A Advices that 900718 emergency plan upgrading pel- NUI1E0-06S4
will he delayed until BO 1C 01 Request's ropt from 300423-33
Emergency Preparedness Team i>evleu
UIDNEft.W A. Georgia Power CD 50/07/31 Ip
7240254 Corrected transcript nf DOQ7OH prehearing conference in
arnsburg.PA Pp R6-119
Atomic Safety .Hid L i-co-nsing Soar d Ponel 0O/O7/OB 36pp
Congre
Cnrrpspondenc
9340333 Resjmnds to 7904^!J Itr to President re ThH-2 accident
everal grouiis an invest iga 1 1 ng TMI-2 acildHnt t< nuclear
ouer /iasurps that NRC will taVe necps^arij ac-tkone to
nsurc public safety
EMDR1E.JM Commiision 79/PB/O? 9pf>
5300232 Rp-vpQndE to HOOIOfl request for info re fJ Slernalass p
Infani Mortality CKung-ea Fallnutng TMI rtccldent " Analysis
f radiohialu^ical, eptd-oirnnl<.g i c.il *• ph LJ * loJ naica ) aspects
ndlcate nn scientiFjc vo-liditij tn Sttrnag lar.s allegations
1RCH9.M J Qffire (if the FitLutive Birectur For Operations
0/Q4/29 Ip
70203OJ Dificti^^e', 6td
esponse to 800327 I IT
, J F romra i B a i
u^ uf at turns TV cleanup ac tiv i ties, i n
concerning proposed Kr-S5 release
n BG/06/04 Spa
0070PO313 fninmunt' nn proposal tn vpnt Hr-fi5 Prom containment hldg
should idfiitifij all Future problem** f, possible solution?
that may arise in other phases of rlsanup operatidn Offers
support in ".peling technical or scientifit sdvice
THDJINBURGH.U Punnsy Kan la, State of 90/Ob/K. 3pp
0070^0393 Eimea^p5 coHEern tlist NIIC -nay permit venting of krypton qi
from reottnr- in manner thst may e-ndanger public Dhysical !i
mental heal tli MPC should ut tab J i iti independent panel of
scipnttsts tu evaluate deciMonn rv faiillty cloanup
HErJNCDV. E M Senate BH/O3/P7 3pp
7110363 Eipre^^e-p inleipsl of Eiw i ron, Enprgy t, NatitTal Resnurres
ubcomrnltttE in TNI ntcitfent i mp 1 i cat inns Comml B s loners are
nvltad to EOQ702 public hearings to present NRC fiallcy
tateme-nt d discuss- iniarvonorb' 1 imi tati tins
IOFFSTT.T Cgngreis (Joint 'c Rot-atlng Commi ttoesi ett t 90/06/34
I7140D5D Provides Subtommi ttce on Energg. f, Water Development
e reprogrflmnung nitiona fen approval Includes priorities tr
tatus items, ru'prnijromming an.ily a i E, n* ji -t*rm 01. tuskt ti
VBD base tatli? U/o end
.J F Commission BO/()iyaS 2pp
007140063 Fiovldnt Subc ommi ttue on Tnergy & Watu-r D*velopment ui/info
re repiDgramminrj aetinns foi approval ImlnUe-s priontias (•
status i tc-mt , rcprDgrammim) .ilia I g !. i B. neai — torn OL tasks fc
FYBO base tabl-e W/o encl
F C«mmissinn HO/Oi/BS HHpp
0 Ad judttatory correspondenc
BQQ73 10243 Foruards Commission BOOn37 mn-morandum d orde-r containing
decialons. on DCS 7SOBO2 petition fnr reconsideration of
700413 Fmrroorandum fc order UCS 77H01 petition sought aitton
re fire pratiection For elcttrical cables
EIEENHUT.D 0 Division of Lie em i ng BO/O6/25 B9pp
P Operating license stage documprite (< c grrespondencD
BOO7S30O2B Summary of DO0307 (nesting w/K<ir)i I ounere group In Duthoada.
MD. re reviainris t» NUK acceptance criteria J. outstanding
issues relative to Mark I containment long-term program
QFtlMEB.C T Plant Systems Branch 90/02/21 31pp
80071406-41 Advlies tdat dates of responses to 790927 generic Itr tu»re
79103S tar Peach Bnttom 3 t, 3 t, 791115 for Hatch 1 8. 3 Rept
on valve op«rability program reqtitred only far plants
desiring to justify unlimited purging
VERF1ELLI,DH Operating Reactors Branch 1 BO/06/05 Ip
000701047-1 AdvisoE that util uill comply ui/H00507 Itr issuing rive afidl
TMI-2 rnlaled requirements foi operattng rnactors When
Impl ementat inn criteria is d evelc-ped . HF1C mill bo notified of
any variation from atdadule Re-serves three options
WIDNER.W A Oeoraifl Power La 80/06/20 Ip
BOD7030A3B Advises that revleu bat been completed on HOQ513 ropt of
callbr results an sniamic instrumentation Trtaltal
TijnB-History ftcie lerograph. ELSl-NDHl waa returned tc- vendor
for repair as recommended
MAMF1Y. M Gporuia Power Co BO/Oi/23 Ip
8007090339 Notification of SOO7O3 meottng ui/util in Betheada. MD to
discuss util basis far delayed schedule For installing
T- quencher*
vEFlFlELLM) Operating Reactors Branch 4 80/06/2A 3pp,
£1007030237 DiscuSKes applicability of OE responie to quBBtions raised
b«j C Mi Che 1 nun, in restponsD to NflC BO 0307 r«q.un5t Automatic
tBolatiDn may otcur For breais outside nr Ineide
containment depending en break size h location
MIDWER.W A Georgia Fewer Co BO/O6/30 3pp
B0070B032a Application for amend to A? p A of License DPH-37, submitted
an proposed changes to Tnch Specs re diagnostic test
program Fnr HPC I sijs
UIDMER.W f, Qnorgia. Power Co BO/O7/02 3pp
— 00070903^7 Propusud umond to Tech Snecs 35D2ft'1 5I> l.allowlnfl
one time diagnostic tett program of HPC I sy-s
» Oporgia Pciuor CD BO/O7/OS Ip
Supuls jrHViini". ri'bponsc' to FO1A requost for written
onvraurncnt itinu between NHr !, Congr-ecs tine* 800333 re
acility TorUflritt rt Mijers B00503 Itr to V StelSo Info
lartially uithfmld list (if nuual i out, (rpf FOI A EiBmptian 71
ELTDH.J M Division of Ritlet. an* Rc<npdu 00/07/17 Ip
B007l8090d Confirms D Uerrelll B0070S toUnn u/CT Mooro authorizing
temporary amend to TDth Specs revising limiting conditions
for operation of HPCJ sijs to perform operation 000703-09
u/lnoperable HPCt far- diagnostic & reliability testing
NOVAK. T M Division, of Lirensmg BO/07./Q3 Hop
!007530D65 ForuurdE questiona concerning failure of util emp-lnijBff
provide jovt officials ui/tertain sjgnlfitant inPn -dur-lng
early stages of Facility Inrldpnt nuesttons withheld (r*P
FD1A FnomptiBH 71
MYERS. H Utilise nf Rep . Interior R Insular Affairs GO/05/OS
If
Confirms util commitmenfcs at B00703 ncating re schedule for
completing mod B For resolution of Hark I containment long-
term program Meeting summary end
REID.R U Operating Reactors Branch 1 BO/O7/07 Bpp
flt>O7ia04B7 Summary of 600703 me eti ng u/util ro Ucen^se schedule for
completing rnuits Far resolution uf Mark I ccir-talnmen t long-
term program
VERBELLI. B M Operatlnfl Reactors Branch 1 BO/07/07 6pj)
B00723O&56 Provides info re new oft ti tl SB, pas i tioni b asr, Igrmcri ts of
personnel resulting from BOO42H reorgani mtl on at tlfc of
Nuclear Reactor RBgulatian
NOVAK, T M Assistant Director for Operating Reactors BO/07/10
2pp
flc'liii"' t t i> i t i>n> i i>n Ic. !(*'(!/ Ill In , i, rap 1 i> I l> 'i
1 fc J.' of IE HiilUtin HO Id ' i Lii>r,imilt.tt 11 I tl nl
Sij>5 S. ne-iuliini) PnlLiht i.il fin irMrmm tin i'tl Urn nn 1 1 f> I 1
Ho 1 ed&i! lit find j iinf t i v t ti| In I i- . 1 7 I'M
A f.roi ill, i PIJUII.I ( i- tli)><i*>/r' M'
l|illM*IJ t u I t Hi run
BOO73B0634 Application to amend Licenses DPff-57 & NPF-5, chang ing Tech
Spoe» re torus water temp IF uater temp cannot be restored
uithin 34-h, reactor shall shutdown using normal shutdown
procedures
WIDNER.W A Oeorgia Power Co 8O/O7/17 3pp
OOO71fl(MEO Di ;f\i;;e-. 11(1(1)1'' imiHpnt lull 1 1 U i M*I.,I I i.H i .(U )/i t Inn lm,i>1'
e»c BUilliiij limit', iii, U in fc i,.il) .,' i i VINHJ .*l Htii nwf 1 1 » ' * "
Ftiru.ir (1 5 not n P o F vi iil.it i oti ' in. I 1 1 w nf [n «(J ^ iinpim t 1 1 tin
df civil ucnd U ti|
STFLUrJi V llffni' nl iii'.pui t inf. }. Mil *. i i irni lit , ottlli' iH tliu
Directoi Ii\)/l>eiJ \V .'pa
--B0072BO642 Proposed Toch Specs Sections 1 O & 3 7 re torga mater tor
If uater temp cannot be restored uithin 24-h . i cat tor shall
shutdown using normal shutdown procedures
• Georgia Power Co BO/O7/17 9pp
BOO7310336 Requests written corif i rmsti on of 800711] telcon re critical
situation concerning electrical poiupr generation in region
served bu utll
NOVAK. T H Assistant Director For Operating Reactors 80/07/32
Spp
Inspection reports, IE Bulletins (< correspondoncE
8007240213 Forwards IE Info Notice BO--EO, "Loss of Decay Heat Removal
Capability at Davis-Besse Unit 1 While in Refueling Morfo "
No response required
O'REILLY, J P Region 2, Atlanta, Office of the Director BQ/Q3/OB
Spp
BOO714049O Forwards IE Bulletin BO-13, "tracking in Core Spray
Spargers " Written response required
O'REILLV.J P Region a, Atlanta, Office of the Director BQ/O5/1S
lp
B007O2017B Forwards IE Info Notice BQ-33, "Breakdowns In Contamination
Control Programs " No written response requirori
O'REILLY. J P Region 2, Atlanta. Office of the Director 80/01/20
B007O102SO Forwards IE Info Notice BO-23, "Loss of Suction to Emorgoncij
Feiduater Pumps " No written response required
Q'flEILLV.J P Region 2, Atlanta, Office of the Director 90/05/29
H.'diin ,', dl i.nilo IIP! n
IP
Gn0711O,J50 fie* iiiiijil [H tKKVU'l Ui Mitiii irurmi rllH i.l tilU|jn ti
corrert v i o I n 1 1 uri tioti'rt in II- fni.ii Hcplr, ',£1 I.'1/IIU IV '.
J P F) on i ti n J, All. into. I uiM I in i I i tij '• fill i>f lulu Ilnful
Brantli [fll/()'>/,_1 i ]p
— BOOyUOJri? H*'B(.u(iil.. ti> NIV£ HfJO'U:' 111 to vlnl^il n>n ntitflil 111 [(
flanlc SO-:i£'l/H[»-lV (. !i(I-.*C.tVH(»- l<> (oni-iH/i) .iilliiilr full
audit of c.nior [jour ij |il.in *i imp 1 t'lnun I mu |.i en 111)111 n i c nn|> ) u lud
WIBNER.W rt Biiurrjiti Puunr (« Ud/(Jfi/ dl 1;.
— BOO71 lOHAS" rniuunl-y IT Iuw|. (ioptt. Ml i.M/HO IV *-. 'Ill
HOOfl21-;"l (. nt.tiru of viulnt inn
STHim, J P Idigiiin ,', ,M,l,>Ti(.i, I in- 1 I .11 i 1 1 | ij t. rl.ilui I iM «
Branch (JO/OH/ II1 -!p|i
Not l if- of vinliitliili fTora In [i i.l' HOOHr'l .">
* Ileoinn £ P AL1 JH t,i, (iff , i i i, I- tli« Dm M tin IIC1, ((') ' I i1 I |i
—B007IIOB'6 IF lnap ffiipt'i SO '(.'I/Ill) IV *. ',<> - <KI.HW IV on IHKIIIM ,">
Muni nmpl Inncn iif,1 uii r.iili.vii t n .unlit crni i iji'iu u linji Luiniml inu
pruc nUui i'B nvnrij J! ij»n uiuliii i. HUM ( 1 ,1111 u nF •mPi'tij iiiJli.u
board
PCmiOTri.H j , inawNijw^m.n H..IMOI- .'. AINIIU,!, orruw of N,P
JllroctHr ,/lNH.INS, (J II lluuiim ,', AUl^int.i, Inul I ai i I | tg I.
MubfHtaln ISnft'tij Dr.HKli IHl/U'i/i;1 Vup
B0071O0064 Forwards IE Insp Repts 5Q-321/BQ-23 & SO-364/8O-22 on
aOD412-O512 No noncompl i ance noted
LEWIS, R C Region B, Atlanta, fieactor Qpi'rationa Nuclaar Bunnort
Branch BO/05/29 3pp
FDTUISH)* II rnn(i H.'plf. 'U> l.'l/lli) 14 t, !,() tt././iW 14 nn
0003tV*011"V J. 10 Fririn-comKiit ,.i I I i>n ill i.i irr, n»il in Hue (Itltl/ilV
Itr
O'tiril I V, J I' Ituguir. P, An.ji.rn- tiM|.« iH1 tlm IH. (.- tin lt(lf\Jt,e.' I
— BOO71000A6 IE Insp Repts 50-321/80-22 !, 50~3fafa/ 80-22 on 800112-0313 No
noncompliance noted Major areas inspected Tech Spec
compliance, ROs, housekeeping, plant operations, QA piacticos tc
IE Bulletin 79-26
DANCE. H C Region 3. Atlanta. Reactor Operatio-ns Nuclear Support
Branch HOOEHS.R F Reflion 2, Atlanta, Office of the Birector
BO/09/30 Spp
— 00071 lOO-mO If. ]nu|> Fienlu 'ill Ji'l/HO 10 ', !,{) u,',/jl(» Lfl (,„ IHHJ II '', im.J'J [
3O Noncnmp 1 i (UK !• nuittii mi? Lit nni ki.n-lr nit veliulii t HJ in
BiEotii, of regulatory Jlmiln
BTtlMFi.J I' , WIKIUHUJ I ,)( ( «t.yu.r. ,' rt|]«r,t,t, I 1.11 1 I,.LI!HU I,
Mflturulio FfaTi'lij Dr,»ni.li I M I t , I H NKHJII.I, .', ftllMiil.i, lirine ,.f
thif [liructoi- flll^Od/lV [<pp
6007220072 Forwards IE Info Notice BQ-S6, "Evaluation of Contractor
OA Programs " No written response required
O'REILLY.J P Region 2. Atlanta. Office of the Director RO/06/IO
OOD/170llb Fii.H»|.d« ih (i,iulrtl (1(1.11 -It.UtiKK tlvi. (imiiMMinri I
I'lnnt Domlrit.T<i.li urd Uiilot 'lijt '. Ki< u n] l.m t 1 n tunni 1
li""*?!".1 "*";'"" "' fTHvtinni'l " li H 111 it tin i..m,i,i,n^ i i.H|ii 1 1 ml
•Oiiin -1! /illfim,. -r'Hnn ,,fi tlni mi'inlor UlMKiCi/p*!
O'RLII.LV.J P
B007M0374 Forwards IE Dullfltin 00-14, "Degradation of DWfl Bcram
Discharge Vol Capability " Written rpsponse required
O'REILLV.J P Region 3, Atlanta, Office oF the DirectiiT BO/OA/13
IP
9007020736 Forwards IE Dulletin BO-J3, "Possible Lo» of EmerDency
Notification Bus (ENS) W/Lt.ss op Offsite Pouer " Written
response required
O'REILLV.J P Region a, Atlanta. Office of tJie Director HO/O&/1B
'P
rb)wn,tii. n- intiu- ..... o )A, • P',.vl.Mii..i in<,N,^i .,
Ri>iinini>uiU fin Modi- In I I !H f. I I ',.- )'r , ,,,,„ , ,, (T.IIIS.NI t t BI r
her A or ll rk.L,nM r,,,|L. • tj,M ( , ..... ,.„,,„„,,„ 1B11,,ir-u,i
,'DiIO~,lft """' """ N" WIIl*"» '""<"" ..... r«.i|,,irHI|
.J P K«0ton A Atl,,»tri lilfup >,l Iht. 111,.,,,
0007800.181 'Jwhn.lt, I t r,/i I r,
ovaluflliorui p«i fin nnd tut
B00703029B ForwardB noticus of violatiun t. proposed imposition of civil
pinaltu re IE insp on B00319
BTELLO.V Office of Inspection t« Enforcement, Office nf the
Director BO/Ofc/19 Hpp
HIDNCR.W/I
—8007020301 Notice of violation from inBp on QQQ311 Noneompllani:* note
packages of licensed matU shipped on 80O31B w/radlation
levels in truck cab eiceedjng regulatory limit
"f ln^*e*>°n ^ Enforcement, OFfirfr of the Director
lp
-B0070B0305 Notice of proposed ,mpo*,tioM nf civil p.-naltg in amount of
•4,000 re violation noted during B00319 * nap
°r"sP"ti°r. *, EnforremPnt- OFf.ce nf the Directo.-
Q0071101IM lUifipcmda tD )f Il.HU-Mi, (Ifi W 1P rth,ltlllt „,
p.Mtr«li.,n u.,.1,1 t^mHu,,,,,.,,,. l)(ltllll >«,„ , L.
submitUJ d,,B N, ,„,„„ nilml,1M ,lf h '
liner peno tral um., !< |,*llvl* Juql, (...nr.ri, wo, I i ,, ,1
HI WCFt, W A Gnurg.- I'cw, l,0 l«wJiV()/ ""J ' 'J"r>
DOCKETED ITEMS
O7aa013fe Att receipt of BO0623 Itr informing NFiC of steps taken tu
correcb deviations noted in IF Insp Repts 5jO-331 /SO-O2 !i
30-3iA/Bn-O?
MUHPHV, C E Rpijion rj, Atlanta. HcactoT Construction I, Engineering
Support Branch flO/07/O1? IP
Periodic operating reports & related c Drrespondonct
B007380(b7B Forwards monthly operating repts for June 19BO
MANRY. M Oeornla Power Co GO/O7/1O Ip
3007280128 JtffBpnnrts to MRt BOlUOfl !< 0411 1 trs rt deviations noted in
IE Insp ReptB •>V-321JBO-QZ (< 5O-3i6/HO-O2 Corrective
actions submitted end draft engineering review of !)A fire
protection progi am at NUC 80U6O2 meeting
UIDMER, U A Georgia Pnuaer Co. 8Q/06/23 43pp
•07240253 Ac 1 receipt of BOOMS Itr informing NRC of stops taken to
correct violations noted in IE Imp Reptu 50-321/80-17 fc
SO-366/QO-17
D'REILLY.J P Region 3, Atlantri. Office of the Director 80/07/11
60072-10264 Responds to WRC BOU=M9 1 tr re violations noted in IE Insp
Hepts 50-321/6O- 17 t, 30-366/00-17 (.orrective actions neuj
airlock E-C h erne installed Actions re t-vent t, deviation
repor tab 1 lity justified
HIBJNER.W A Georgia Pnunr Co SO/O6/12 4pp
0007340377 Forwards IE Insp Rspts 50-3^1/30-17 t. 5O-366/HO-17 on
600303-0411 I* notice of violation
LEWIS. R C Hogion S. Atlanta. Reactor Operations Nuclear Support
Branch BQ/Q3/19 Zpf
— 8007230680 Monthly
BLACKHELL.F! H
perating rept for June 1900
orgia Power Co EO/O7/1O Qpp
— BOO72a0686 Foruards monthly c
MANOViH Oeorgia Power Co
aratlng repts for June 19BO
80/07/10 Ip
— SO 07 29 0692 Monthly operating repts fur June 19BO
QLACKWELL.R M Georgia Power Cn BO/07/10 7pp
3 Reportable occuri-enrei. LERs t, related correspondence
B0071102DS FIO-50-321/19nO-61 on B00622,uhUe preparino to run RHR »ut.
"B" RHH loop mm Floui manual valves uere discovered cloied
Caused bg failure tn return to open position after loop was
taken out of shutdoun cooling mode Valves locked open
HANRV, H Georgia Pouter CD BO/06/23 lp
8007030276 Fnriuflrds LER BO-06S/03L-0
MANRY, M Georgia Pouer Co BO/06/24 lp
8007240285 Notice of violation frum insp on HOO30Q-O41!
ft Region 2, Atlanta, Office of tlin Director 80/05X19 2pp
B007240a?2 IE Insp Repts 50-321 /BO-17 \, 5Q-3&6/UO-17 on fl0030S-04»l
Nancomp 1 ianci- noted failure to maintain secondary
containment door Integrity !< to me-et NRC roporting
raquirementB
ROGERS, R F Region 2. Atlanta, Office of the Director DANCE, H C
Region S. Atlanta, Reactor Op era ti arm Nuclear Support Dranch
60/03/19 Spp
— BOO7030S7B LER GO-065/03L-0 on 500614, uhi le inertlng primarg
containment' nitrogen storage tank was found to contain less
than 3,OOO gallons nitrogen Caused bg Increased use of
nitrogen
OAXLEY, 8 X Georgia Pouer Co BO/06/24 2pp
2007030361 HP on 000532, 1 icensee reviouied Kinemetr ics. Inc 800513 caller
rept re seismic instrumentation Triaiial Time-Historg
Acrelerograph SL51-NO21 calibr indicates cicessive change
in Inngitud inal channel characteriiti cs
MANRY, M Georgia Pouer Co SO/Ofa/25 lp
O7E3O292 Hesponda to IE llulletln BO-17, "Failure of Control Rods t
ully Insert " Be ram discharge vol (EDV) vent % drain
ODBrabllity veri Pilot I on teat performed All drain Si vent
valves verified operable No residual water Pound in SDV
HIDNER.H A fieorgla POUJBT Co aO/07/11 lp
0731O373 Respond* to NRC B006I9 notice of violation TO ejcesslve
radiation oiposure rate inside cab nf raduaite transport
vehicle Radjiatlon survey indicated radiation levels tilth in
cod IT requirements Jicqua&ts mi t mat i tin of violation severity
UICNER.U A Georgia Pouiei CD BO/O7/lfl 2pp
B007310287 Respond* to- NRC (IDOA19 notice of proposed imposition of
civil penalty Haifiatlan BUPVPIJ of vehicle indicated levels
uithin code t PHuirementE Rpqueats rnltigalion of sovcritg of
violation t, reduction of civil penalty
A Georgia Power Co BO/O7/I« 3pp
D731O5P7 Submits summary of events id rusponse to IE Bulletin BO- 17
^PCI inverter mi-50O3 decl.irod InQpcraoln twice Normal
Hipplij breaker to 4 hV bus PF lr i pped, p lat i ng bus on
al ternaW feed
1ANHY.H GEorgia Pouier Co HO/07/14 2p p
D722.O422 Rnsponile. to IE Bulletin 79-]fl
3uilt Bafety-Rclati'd Piping 5yi " Hrqu
3O1001 to complete ver i Pica t ion of Di-istn
irogrest made !i number of Rfji
JIDNER.U A GBorflia Pomer ''n Hf>/n7/13
'"Jenmit Analysis for
tfi BitenBlon until
it anoly s i SP baspri on
?pp
J7EBQ93B Advil.*1! up pi op-ospd i omj, oiihat orij mcusures re 2-wl
eatensiun Pur t.i ram lasting rcquiroj For IF Qirlletin BO- 17
'til will perform tebi-& at. 101111 us possible bhould critical
load si tu-a t inn *ns.n
•JIDWEH, M A Qporffia Pouc-r *;o HO/O7/1? lp
J7EH054] Adrians nf tomplCtiDii of 1 tfmn 1 !. 3 of IE Bulldlln 90-1O,
"Contamination of Nonvadioar tivo S<j-s " Complete
Jocumentatipn cf riPFrclo-d sys t- asmclflted monitoring
iroc eduros avallah-le for i evuu riiiring Puturo- oniitp limps
A GPflrjia Pniuer ('(. BO/0//1B lp
372?061B Re-c[ue-itl rtelay in |ier Corininii scram ttats reijuirod bg IE
Bulletin 60-17 dirir to higl> temps in. region RBmnv)nf| larga
units Prom avc woiOn1 place stvBi'p strain on electnr
flenBI-ating capBCitU (if rayitm
4JDNEF1.W A Oporsta Power Cu PO/O7/13 Epp
0007030234 Foruai-dt UER HO-Q6a/01T-Q
MANRY, r) Oaorgio Pouier Co 00/06/35 lp
— BOO703028i LEfi QO-06H/01T-0 on BOOhl3i ui/Unit 1 in cold shutdoun.
investigation uas begun to determine cause of pavement
deflection uhlch occurred beneath crane outrigger pad
Caused by improper compaction of In-caliied area
COQ01N, C L Georgia Poiuer Co BO /Oh/25 Spp
6007020638 Fnriuards LER BO-OSi/OSL-O
MANRY. M Oeorgio Power Co BO/06/J
— B007020142 LER BO-OSfr/03L-0 on BOOBOS. standbg gas treatment S(J5
ventilation ?< valve operabllitij procedure, changed on 600123,
had not been PHD reviewed or approved uithin 14 days as
required bg Tech Spec Caused by personnel error
CPGGIN.C L Georgia Poiuer Co BO /Of,/ 37 Spp
6007110307 RO 50-321 /19BO-069 on SOOi2fa, f ol louiing auto initiation
signaliHPCl faileiT to inject to reactor pressure vessel due
to isolating on a team line high DP isolation signal Cause
under investigation Roset isolation & opened inboard valve
MANRY, M Georgia Pouer Co 80/O6/27 lp
B007110400 forwards revised LER BO-O53/01X-1
MANRY, M Georgia Pouier Co BO/Od/3O lp
— BOO7110403 Revised LEO BO-OSS/OlX-l on BOO531. uhi 1 e performing insp of
snubbirsr13 out of 61 uere found locked up Caused bg
internal corrosion Snubbers replaced
* flcoroia PDuiPr Co BO/O6/30 3p p
BOO71 10304 FnruardB LER 80-OiO/03L-0
MANRY. M Goarglo Pouor Co SO/07/O1 lp
—0007110313 LER 80-06O/03L-0 on 80O603, u/reflctor in cold shutdoun, insp
revealed two hanger mods to HVAC room sprinkler required for
seismic qualification uero incomplete Caused by failure to
implement banner moil sketches contrary to procedure HNP-B09
COGGJM, C L Georgia Pouer Co 80/O7/01 2pp
G00711043E! Forwards LEH 90-06I/01T-0
MANRY.r) Georgia Pouer Co BO/O7/O1 lp
— 8007110442 LER 80-06I/01T-0 on BfiQtiSS. iuh i I e preparing to run RHR sys
per HWP-l"AOO6i operator discovered loop B min flow manual
valve; Eil-FQIB D li D closed Caused bg operator closing
valves to prevent reactor water from going to torus
BAXLCV.S X Oonrgia Pouer Co BO/07/01 3pp
DOCKETED ITEMS
155
B00711O3da RD 3O-32l/SO-07i while reviewing as-builts submitted per
IE Bulletin 79-14, util discovered hangers 1E1 l-RHRH-19e> &
1E11-RHRH-313 mould not adequately support loads during DBE
Caused by faulty design in Incorrect valve weights
MANRY. M Georgia Power Co BO/O7/O2 2pn
G007110455 Forwards LER BO-O72/Q3L-0
MANRYiH Georgia Power CD BO/07/O3 lp
B007I704H Forwards LEfi SO-069/01T-0
HANDY, M Georgia Pouier CD 8Q/07/1O lp
—0007170419 LER BO-Q69/01T-0 nn £(00626, »ft ft reactor scram, HPCI failed
to injert to reartor pressure vessel per auto initiation
signal dun to irritating on =tenm IITIB high DP Caused bg
turbinp controls heing out of dynarnlt tallbr
COGGIN.C L Georgia Pokier Co BO/07/lO 2pp
— B00711O463 LER BO-O72/03L-O on B00624, i-eac tor bldg vent radiation
monitor sample pump failed In run mode at 2426 MWt Caused bg
melted carbon vanes Pumps will be switched out more often
to minimize moisture buildup !< improve reliability
ROGERS- H H Georgia Power Co 80/O7/Q2 2pp
S007110413 Forwards LER BO'Oi3/O3L-0
HANRY.M Georgia Power Co BO/07/Q3 lp
8007310370 Forwards !_E
MANRY. M Georgia PL
BQ-07&/01T-O
pr Cu RO/07/14
— B00721O371 LER 30-076/017- 0 on 000701. uhile roaccor mas at hot
for HPCl/reactor core isolation cooling testing. site
notified by rtE thai listed HHfl supports would not adequately
support all design Uased Itijds
COQQIN.C L Georgia Power (o 80/07/14 Hpp
standby
— 80Q7UO4B6 LER BO-063/031.-0 on BOQ&IH, uihi 1 H performing surveillance
procedure HNP-1-0102. reactor high pressure shutdown cooling
node switch 1B31-N01BB found to actuate higher than limit
Caused by setpoint drift Switch recal Ibr
NIX.R T Georgia Power Co 80/07/Q3 2pp
BOQ72103B'! ftO on 800711. Unit 1 LPC-I invertei tripped I. Unit 3 4-f<V hu
3F supply breaker !i HPC I tripped Supply breaker brip caused
by jumper mis&ing from neutral leg Motor vfllve on HPCI
replaced maiing it operable Events submitted p ei I EH BO-17
MANRY.M Georflia Power Co H[)/O7/lfl 2pp
0007130939 Forwards LER BO-OS9yO3L-0
HANRV, M Georgia Power Co 80/O7/03 lp
B007S10flB4 Forwards LER 80-07H/O.IL-0
MANRY.M Qeoi-gla F'ouer Co HO/07/14
--B007190314 LER 80-059/03L-0 on BOO6I7, approi B-h after performing
•upprasiion chamber to dryuell vacuum breaker ays
oporabilitg tott, closed indicating light for valve IT4Q-
F3H3F found entlngui shed Cause unknown Testing continues
NIX.R T Oiorola Pouier Co BO/07/O3 Bpp
--60072101)92 LER aO~07a/03L-0 on (300630 (. 0/01, during hot standBij
operation, primary containment uiygen concentration eiceeded
limit Caused by ronctor nldg tu torus vacuum broader valve
opening ti oiijnen analyiers not talibr Monitoring increased
CAXLEY, S X fleoigia Power (o 80/07/19 2pp
fiQQ7l3049i Forwards LER BO-Oifl/O3L-0
HANRY.M Georgia Power Co 80/07/OB lp
Foriuards LER
MANRY.M Georgia I'ouipr Co BO/07/17 lp
—8007130303 LER 00-064/O3L-0 on B00613. durina startup , reac tor core
isolation coaling syi initiated to maintain reactor uater
lavalibut Failed to respond to speed control Caused by EQR
not responding tt limit switch being out of adjustment
N1X-R Y Oeorgla Power Co BO/07/OB 2pp
--8007230519 LfR QO-OBO/03T-0 on B(10706. lu/reoc tor in hot standby t.
reactor uater cloanuji in normal dpi'ratl oni ma ter Pound
coming Prom ilcdiiup line insulation, due to crack in heat
offocted iunH of spool pipce Causp unknouin Piocn replaced
COQOIN.C L Georgia Poiuer Co £10/07/17 2pp
B0071306A6 Foruarils LER BO-Q66/03L-0
HANRYiM Georgia Power Co BO/07/OB lp
B0073B0413 ForuiardB LEU 80-OW/03L-0
HANRY, M Georgia Pouur Co 00/07/17 lp
— B0071SO474 LER BO-Oi6/03L-0 on 80061 S. d Intel oenerator 1C declared
inoporable uhen low air pressure alarm received u/reactor in
pun mode Caused uu, valves failing In unloaded mode. Unlaader
valv>* replacBd d air receivers returned to proper pressure
NIX. ft T Georgia Power Co BO/07/OB 2pp
— 800736044'? LEfi BO-067/03L - 0 mi BOQb.21). ifiiring djesel generator manual
start pror Ddiifb, D guneiutoi tripped Cause undertermined
Probflbll; caube IE spurious alarm or tranficase ptessure
Oeneratnr proved ojieralile !i returned to uvc
NIX.R T Georgia Puiuer Co BO/07/17 2pp
B007170302 Forward* LER BO-098/03L-0
HANRYi M Oaorgia Power Co BO/07/OB lp
B0072BO'1'15 Formal dE LER 00-07S/03L-0
MftNRY.M Ooorgia Pownr Co
™ B007170387 LER BO-OS8/03L-O on BOOili. tlireo addl control rod drivellne
aceufflulatort declared inoperable Caused by hydraulic control
units not maintaining nitrogen pressure due to cartridge
valv* 1C11-F111 leaking at stem packing
NIK.R T Georgia Power CD 80/07/OB Hpp
--B007280446 LEH BO-07a/0'3L -ft on B0062A, u/mode switch In run-prlmaru
containment temp rpi.oriler. 1 T47-R61 1. found to be
intermittently Failing to print Caused by commutation motor
gearbox fait urn Balancing arm magnetic siuitch icpalred
NIX.R T Oenrgi,, PowBI Cti Qd/07/2? 2pp
BOQ717O392 Forward i LEH BO-06B/03L-0
HANRY, M Georgia Poiuar Co BO/07/OB lp
B0072B0572 Forwards L£R 00 0131 /03L-0
MANRY.M Oeoi-gia Poiuer Co HI/07/aa lp
-- B007170408 LER BO-068/03L-0 On B00619, 1P33-R601 druuell dihydroBen/
dtaxid* recorders obcerved readlne abnormally high oiijgan
content C«u»od by uoter present in dioxide analijier sample
line Deilgn chano> implcmanted
NIX.R T Georgia Power Co BO/07/08 2pp
— B0072BOSB8 LGft 00-OBi/OJl -0 on BOD'OS u/mode siuitch \n run.druuiBll
pressure recoidui IT4B-R608 Inund Inoperative Redundant
recoriltr IT^R-fliO1? uifli operable Conseil b« CDmpnnent failure
Transmitter repaired, retail br ft returned to »vi
NIX.R T Onorglfl Power (o HP/0//DH lp
8007170481 Forwards LER BO-073/03U-Q
MAMRV.M, Otoroia POUBP CD, 80/07/OH
8007200627 FormarilK LCR aO-07//!HL-0
MANHV.fi eeurolu Pouer Ci, fiQ/07/3? lp
—8007170463 LER 60-073/03L-0 on B00624. iu/reac tor at 1OOX poiaer, dr«inel 1
to torus temp recorder noted not stamping or chan(j»ns
position Caused by faulty stopping advance & chart drive
motor* Repaired & replaced motors
NIX.R T Gtorgia POUBV Co 80/07/OB Ppp
— B007280640 LrH BO-077/O.C II on fllO/Ol!. dur 1113 higli ri>iictor pressure
instrumentat Inn Punt Itonul tpat Si calibr, Pound that pressure
luiltch IQSl-Nliyitl BltufltHd in titeis of Tecfi ^jiecs Caused ty
aetptiint drift 'iiuitrh ruinlibr Ei OULI i'si ful ly rested
NIX.R T OHnrgi.! Power tt< 00/07/{!g Sff
B0071704B1 Forwards LER BD-071/03L-0
MANRY, M Oeoroia Power CO BO/07/08,
80072fl06BS FonuBrdi 1 ER 80-0/0/(ML>0
MANRV.H Oeor-gla Power Co UO/07/3J lp
— B007170497 LER BO-071/Q31 -0, on SOOiHli while performing dally rounds
-r-'-Klorr'-'r.jrlt *•»- --r- — Jer, 1T47-R611 1 found stamping
. i die ..i -i i , !•, . • e motor starting capacitor
in, a i H i e i «• . • * . .,. m returned to sve
•.-n .t I .. „• • BO/07/09 3pp
—a 007 2(506*110 I Ffl 80-070/0*3) t> on BOOi-Pfi, during hanger insp on class one
piping, snublur ILfll-HI'SI- H13 dlucnverpd to haw oil loafc
Caused ntliitntitfl tu seal iPnkiigo (in snubber Jailed snubber
replaced
NJX.fl T Oaitrgt.) Power t » HO/0//ftV 2pp
56
DOCKETED ITEMS
107 300 3 72 Fciiadrds LLR E3Q-O7-1/ QJL-0
HANKY., M Georgia Power Ci! BO/07/24
a0073flO5in IEK PO-O/4/OJL-Q on 000626, Fol 1 cui ng reactor scram, r BBC tor-
core isolation co&linij failed tn injort to reactor pressure
vessel mfien manually started Loused by intermittent
operation nf rMMCCI DJ200G limit switch nr GE UFA relay
CDGO1M, C L GpDi-gia Patuer Co BO/O7/a-J i?pp
DCWET 50-1P2 SHOHEHftM MUCLEAH POWEH bTATIOH
Appl itati Dn/c.nn*trL<(.t jan itagt- documents fe correspondence
007Q30239 NotiFuslion of POO7<U meeting ui'BWR licensing revleu group
in BethE5d,a, MD ta discuss cnnsenstif position Dn reactor
sve bldg open is'sue
HILSDM, J N UiL-Bnains Branch 1 80/06/1H 9pp
OO701QJ'?? Summanj op HII0613 meet inn u/ut i Is, KMC. Inc . OE, De-ctitel. 91.W Ii
Sargent !< Lundy in Betfifrsda, MD re consensus petitions on
reactor svc bliig !< Isolation tunllug siji hldg open issues
Prpm La Sail a dotki't Status re-pts encl
HILSOM, J N A-^istant Director fnr Licensing 00/06/19 46pp
007H10I76 For-mard* MiJC evaluation n f GE T t-pt. NFDE-S4CMO-P H Buppla
1-3. "Technical Bns-is for USE of SqudrB-Rool-of-Sum-Df-
Bquares ISRS3> Method tar Combining Dynamic Loads for Mark
II Plants " Flept fliceptablc subj to certain ronstraints
MftTTSON.R -J Division op B.ifety Technology SO/O6/S5 3pp
-HOO7aiOlB9 Tnpical rept ewaJuatmn of NCDE-34O10-P t- Suppla 1-3.
"Taclinital Basis Por Use nf ^quare-noot-of-Sum-of-SnuaTes
(SRSE1 Hethnil fur Comb i nin-g Oijniiiiiic Loads Far Mark II
Plants " nppt Mtteptable M/D tCBpl ion oF Criteria 1
* Mechanical Engineering Hrani.li BO/O9/31 Bpf
007230001 Foruiard-s statempnt nf= polity re requi roments lo be mot fur
current. OL np pin ations. a& derivP-d From NUREO-OfaiO i- found
?'!
G Division oF Lltunstna BO/O6/2fc Spp
007170473 Suromari, of FWOt.lD mcpttnq u/Mark I] lead plant applicants
re definition nf T-quuncliBF load spec following safoty/
relief «al\e aLtliafcinn ViBwuraphr unt!
SU^ T H Containment Si/ttems Drantn BO/OA/a? 4pp
Notification of 80D725 meeting w/BWfl - Licensing
Group in DetheadaiND to discuss concensus positions of
B!JS - Llronsing nevieiu Group on ICBB opon iSEues
HlUBDN.d M Lirensing Di-onch 1 BO/07/16 lOpp
GOO7a50569 "Final Rapt on Reactor Vessel Repair "
* Lang Islon-J Lightinfl Co HO/O7/17 12Opp
0007230490 Forwards "Design Criteria !< DESCT iption. Techni cal Support
Ctr "
NOVARRO.J P Lung Island Lighting Co 80/07/21 lp
— 0007230163 "Design Criteria (< Description. Technical Support Ctr "
• Long Island Lighting Co 11600 02 SO/07/22 17pp
G007a30175 Notification of ElOOBOS meeting ui/reprBsentati ves from Marh
II oiunei-s group in Chicago, II. to discuss load Mark II plants
chugging b C/0 load spotE
ANDERSON. C OuneriC Issues l)rdncli QO/O7/B3 3pp
F Security, medical, cmargannj Ii Pire prut net ion plans
B00714031? Motification of QOOBO1 niBBting u)/util in Silver Spring, MD
re evaluatinn of recent revisions to facility security plan
i d N Licensing Branch t BO/ub/Sfb 3pp
0 Ad juiticafcorij correGponden-ce
8007030093 Notice of appearance in proceeding Certificate of Svc encl
FrtflLEY,A F Long Island Lighting Co FAHLGY, A F Hunton &
Williams {10/06/12 3pp
Q00709000i Response to NRC !, Qhoreham Opponents Coalition QOOtOi
slipulstinn Contentions S t< 0 are adequately particular i led
Contentions 1 & la must bn modified Contentions 7(aHii).10
tt 11 inadequate Certificate of Ivc encl
nEVELEV.W T , EARLEY.A F Long Inland Liohting Co HEVELV, W T
Hunton t Ullllami 80/06/17 9pp
8007310243 Foruiards Commliaton 800537 memoranduni & order containing
decisions on UCS 700302 petition for reconsideration of
7BOfll3 memorandum t, order UCB 771104 petition souoht action
re Fire protection for electrical cables
E16EWHUT.D 0 Division at Licenuing BO/Ofc/23 fl9pp
0072302-52 Summary p F eOOilS mFCtinfl u/Hark 11 1 pad plant applicants re
melhodnlogij prnpmed &v jpiilicants to dePine T-quenchor load
spec FnllDuing ^oFi-ty re-lie f v,ilv« actuation Meu methodo logy
uilll lie applfc.idlp tn all Mark II lead plants
3U-T H GenpTir USUEH Branch BG/0£i/27 3pp
00717033^ NntiFicotion of rescheduling of B00702 meeting u/DWH
licensing m-vtuu group in OctheidaiMD t-o discuss cun-sensus
positions on Heuttor Sya fli-ancli open IBSUCG Mtu-tinr)
refithoduled for G00701?
WlLSOf), J N Assistant Diret tor fur Licensing BO/07/O3 lp
B0070aODS6 Urdpr rejecting NRC Ii Shorohani Opponents Coalition 500606
stipulation as submitted on BOOilS States status of OL
proceedina Contentions 1, a, 7(a » 1 1 1 ). Bi 10 l> IS Joint request
For eitonsion until B0060i granted
BDWEHB, f: B Atomic BaPetij and Licensing Board Panel BO/06/S6
Gpp
B0070aOiO(, Qrdor accepting util.HRC t< Suffolk County third stipulation
re certain of Suffolk County contentions Agrees u/NflC 000611
interpretation of Footnote 2
BOWERS. C 3 Atomic Safety and Licensing Doard Panel BO/06/26 lp
-6007170347 Notification of B007SE niaeting ui/[)HR licensing revleUJ group
in Botlnsda.MD to discuss THI issues requirfd Fur CL
i sauani*
WILSON, -.t H Asstatant Director for Licensing SO/O7/03 lp
-B007I703S1 Notificdtlon of a0072-1 (noetina u/BHR licensing review group
in QethesdaiMD tci introduce DUFI licensing review group l>
present consensus p-ositinns FDT Pouier Sys Branchi Containment
By* Dranch !< Enipipmunt Qualification Branch
HILBON, J N Assistant Dn ectur for LiLDr-slng SO/O7/03 ?pp
I007BI0189 rormairls rei|tii>9ts for udill info in fonnpelion u/util
appliratic-n POT m. Info needed In areas of mnchanical
engineeringi nawer *y* ti instrumentation tt control
TtDESCO.ft I. As^iEtant Rlroctor for Licensing BQ/07/03 a^pp
007330621 -Buwnarg nf ROOftlrf imtBtina i,i/Mnrfc II owners grouf in
Qethesdo.HD rp \ B'.id plant iloaurp (. lonfl-lerm prostam Moils
should be mode to nenaric lead plant condensation
OIK illot ton fc 'hugging pnol btiunuary loads Vi e-iugraiihs nn-cl
ANDEHSDN. C J Ooneric IB-.UHS llrant h 60/OV/O3 57pp
Submit* rommnntti on NUREO-0619, "riWfl FPediunter Noltle
Control Rod nr \vv Hoturn Lino No 1 1 1 a Cracking " Mod should
be msde in Tatli' *., "Routine Innp intervals" re two piston
ring anal 5 & tl.id reitigval on Page IB
NDVAdPO, J P Li'iig Island Lighting Co an/O7/0£J 3pp
itattiK iff nuri-TMJ ot^en i
t4 I.iiBnamij Branch 1
in Be thesda, MD to
8007090304 Order admitting ShorBham Opponents' coalition Contention 13,
Sub part 3 in OL pi oeeerflngi as within guidelines df
CommiBBion 800316 memorandum t< order Issued tn TM1-1
restart proceeding, CLI-80-16
DOWElia, E 8 Atomic Safety and Licensing Board Panel BO/07/02
B0070BOOS1? Fariiiards documints on loan liaulB in response to request made
during Shoreham B00617 mietinfl TREE-NUREO-1200, DNL-NUREO-
33361, NUREO/CR-01a2 t< NWEO/CH-0374 pr**<ntly unavailable
but will be provided uben located W/o encl
BOHDEH1CK, D M Hearing Branch 4 80/07/03 4pp
D0071&D6O1 Forward* LER printout re passive mechanical valve failures,
in response to Dec 1979 request concerning Countv Contention
4a(<i) Forwards ACRS latest r-epts on generic issues re
County Contention 3<aHi) it (ii) W/o encl
BDRDEHICK, B M Hearingi Dranch 4 00/07/11 Bpp
B007I703B4 Motion to deFer briefs re Commission Q 00620 policy
statement, in responso to ABLB 800626 order. until BO 1031,
1 Process re particularif atlon of contentions, should continue
prior to writing briefs Certificate of Svc end
REvELEY.U T Long Island Lighting Co REVELEY, H T Hunton I,
Willinnn, flO/07/ll 7pj>
B0071605S3 States no objection to applicant B00711 motion to defor
brlefo (in Commioeion BO06SO stafeoment1
BDRDEN1CK. D H Hearinj BrancJi 4 00/07/14 lp
flO/07/01? 3pp
157
H General correspondence
BO071B0042 Responds to B00123 Itr re NRC approach to emergency planning
around nuclear plants Commission endorsed NUHEB-0396 far
development of state & local radiological plans Eiact
configuration of lones luill be decided during plant review
DENTOMiH R DPfice of Nuclear Reactor Regulation. Director
BO/06/03 app
— B0071B0047 Requests that NRC amend proposed regulation re formulation
of evacuation plan to include all territory east of
facility Proposed 10-mile radius is unworkable for people of
Lung Island Responsible plan should be developed
DEHAN, J L New Yorlc, State of BO/01/23 lp
B00721003S Responds to BOOS SO Itr re NRC. reneging on agreemen
representatives to Suffolk County Legislature 900828
t to send
Fiscal limitations !< other priorities may
occasionally prevent requested attendance
EI8CNHUT.D G Division of Licensing 80/06/13
lp
BOQ724000B Forwards NUREG/cn-1215. NUflEO/CR-1363 !. NORCO/CR-0131, in
response to HQ0617 verbal request Kemony rept not available
for distribution Cleanup EIS not uet issued NUHEG-0663. Vala
t t, 3 tt NUREQ-05BB sent separately W/o ends
HORDENICK. 0 M Hearing Branch 4 BO/07/23 2pp
K Utility Final Safety Analysis Report (F9AR) & amends
0007070243 Forwards Amend 36 to OL appl ication. submitted as Revision IB
to FSAR Affidavit end
NDVARRO.JP Long Island Lighting CD 80/06/27 2pp
— 8007090246 Revision IB to rBAR, incorporating responses to NRC requests
»ubmftted in Itrs SNRC-465, -469. -473 t, -4BO !( clarifying
portions of FSAR
<t Long Island Lighting CD 00/06/37 H7Spp
0007H3O39B Certifies svc of Amend 36 to OL application in form of
Ruvision IB to FSAR, on flOO707
MDRIN.J P Long Island Lighting Co BO/07/14 lp
0, Inspection reports, IE Bulletins & correspondence
800714049H Forwards IE Bulletin BO-13, "Cracking in Core Bproy
Spargers " No written response required
ORIER. B H Region 1, Philadelphia, Office of the Director
BO/05/12 lp
B007010asQ Forwards IE Info Notice BO-23, "Loss oP Suction to Emergency
Feoduater Pumps " Mo written response required
ORIER.D H Region 1, Philadelphia, Office of tl>o Director
BO/09/21? lp
B0071703B3 Forwards IE Insp Rept 50-3SS/BO-07 on 800422-34 Mn
noncompliance noted,
CARLSON, R.T Rag ion 1, Philadelphia, Reactor Construction t-
Eno,in**rIn(J Support Branch BO/03/30 2pp
0007160701 Foruaiil!, 1 L Cnrulrii 00-11, "Had icfu live ! ontami jiflt i on of
F'lant ueminofti 1 1 led U.jtpr L)ijs 'i lU'jultant Internal
Contami nst i rn nf I'r' bonni? 1 " pin uiitten i espouse require*
OHIEH.D H Keg ion 1 Phi 1 Jde t pMil, Office of the Director
80/06/P4 \f
Q007160Bfi3 Ack n-tBi|>t of dOOfrOS It
ihorming NRf of steps tnien to
50-322/ /?-34
CAF1L&ON. ft T liegiDTi 1
Engineering Sopimit Dran
— QD07l60Hft7 Rpepond' to fJFIC OIIO4JH Itr r
Invpstigat ion Rr-pt 30- 3^P/ /';-=)4 Crrre
UDFFORD.A W Long Islam) l-ii|hbiiti] CQ
Lonstruction
> viDl.itluns Tioted in IE
Uvf acticns defective
BOO73I01V9 Toriuards Jl£ Infn Notice BO-P4, "Lou Level RadLuagiB Burial
Critend " No mntten response riquired
GFilER,!) H Region IP Pti i J Jiiel phi a. Offirc at the Director
BO/06/2!! lp
B00723O12(3 Foiusi-dE !E Duilptin EIO-16, "Putentiat Mi fiapp 1 1 rail on of
RosBmount Inc MtiUels llbl ', 1 L'i2 f'reisure Transnn tter-a
W/Eithur A or D Output CndB' " Written response requipfld
1C Circular HO-16 .ilsit one l No written response reijulred
OnlER.D H Reglun 1, Pht l.idelphin, Office of the director
BO/06/27 app
B007210033 Ack fpceipt of B004K, Itr informing NRC of steps taken to
correct violations noted in IF. Insp Rep t 00-322/7<J-07
Analysis of rdt BUiiij/c.ih 1 e scpiiistinn rpquebtcd flue to
continued nont urnp 1 ianc e
CARLSON, R T Region 1, Philadelphia, Riot tor Construction !<
Engineering Syppui I Briincti aO/07/01 Spf
—8007210040 Ry,|)anif5 tn NFIC 7V1P36 Hi re violation noted jn IE Insp
Rapt 50-322/79-07 CuriBttwe ardor independent analysis
performed to pnMire prevention of iPactor ahutdniun or decau.
heat remov.il Takps t>]ceptinn to in«P finding
NDUARRD.J P Long Island lighting Co 130/04/16 3pp
Q0073100S7 Submiti sumrndrg of evcnls. in respon-ie to 1C Bulletin BO-17
LPCI inverter R1<! !iOt)3 decljri'd inoperable twice Normal
supply orealipr to 1 W [JUG 21 tr l pji ei(. p lar ing hue on
alternatn feed
MANRV.M Georgia Power To [10/07/14 2pp
fj Reporlsblc oci ur
8007020066 Acd roreipt nf 700932 final ti p,ni Meant rfcfic I ency rapt
QE 4160 volt rircuit breatei")
CARLSON.I) T Region 1, Pfl 1 1 arlelphid, Resctur Construction 6
EnDineering "Suliport Orarich 7R/O9/I4 Epp
007030073 riniil -jiginFiiant del ir l nntij rppt i~o failure lo electrically
close circuit bryakiT Caused by wearing of ifnving paul
elceve bearing rtll hreotet muchaiiiKjri Tuf-loc sleeve bearings
will be re(il,tLed w/aluminum-hTBniB bearings
BWRRE.T J I. ana Island lighting Co 7B/OB/SP 3pp
— B0071702SB IE Inap R»pt 30-323/BO-07 on B004S2-24 No noncojnp 1 iance
not*d Major areas inspected QC program for worfc progreu.
outstanding items fc bulletins t< circulars states
NARROW. L Region I, Philadelphia. Office of the Director
HCOAUBHY.fi U Heaion I, Philadelphia, fieoitor ConatructJon fc
Engineering Support Branch 80/05/38 4pp
8QO72I0371 Forwards IE Info Notice BO-36. "Evaluation of Contractor
QA Program* " No written r»spon»e required
ORIER. B H Region I, Philadelphia. Office of tint Director.
BO/06/10 lp
8007390449 Part rM i'npi re potenii.il intei ferento in full function of
Bergen-raterson sLrirt a^somhlij ui/Parific Eciontifir Co
mechanical shod at re 5 tor (ustumi.rs wtll be notified of
affected itemi tt r pcnmmcnded 5n!ntion
BECK9TED.W [• Bergen-PntlBrBtin PiflP Support Corp BO/06/20 Spp
B007H0390 Folloiitup ilePicipnrij rept ro louse limit switches on GC
Circuit breakniG (,auaud by mounting screws bncblng out
Bcreiu'. mill he secured y/stil '.trcnull, locV-tite t< Insp will
be revised
NOVARRO, J P long Island lighting to ao/07/01 3pp
SOQ7140S7B Forwards IE Bulletin BO-14, "Deoradation of DUR Bcram
Dlich'rgt Vol Capability " No written response required
CRIER, B,H Region t, Philadelphia, Office of the Director
BO/06/ 13 lp
DOCKET SO-3^3 DIABLO CANYON NUCLEAR POWfcfl PI ftNT, UNIT 2
A App 1 ication/cnnsLruc tlon eljge documents !< correspondence
B0072B0994 Foruardfl IE Info Notice BO-SS, "Prompt Reporting of Info in
Accordance W/10CFR50 35<e), " No written response -required
OHIER.B H Region 1, Philadelphia. Office of the Director
BO/06/13. lp
S007OS0907 Forwards IE Circular flO-15, "Loss of Reattor Coolant Pump
Coaling t> Natural Circulation Caoldouin " No written responBe
requirod.
ORIER.B H Region 1, Philadelphia. Office of the Director
BO/OA/20, lp
800706D343 Noll f n at) on of 00062.1 meeting ui/utll in Ban tulB Opispo,CA
to dlsius'. tast act Jen plan items
BUCKLEY, G C Licensing Brdntb 2 £10/06/20 4pp
B007020394 Forwards noiiprriprielai i[ veil, ions of pTHVlously submitted
gent'rn Wpstinglmuse [iropi iPt.ii y 1 tri. to support position
on guide tulif uinar tharrti tHi utifi Ri'qiiBsls m hnotLili'dgtunant
of receipt
CRANE, P A Part fir Gas *. Mei trii Co 00* 06 '23 lp
158
DOCKETED ITEMS
S00723DOO1 Forwards statement of policy re requirements to be met tor
current OL appl ical I onsj at derived From NUREG-Q66Q Jt found
in NURE<J-Ot94
E1SENHUT.D G Division of Licensing, flO/Oi/Ht 2pp
8007070153 Forwards Revision 1 to "Description of Syi Interaction
Program for Seismi cal lu,-l nduc ed Events.." originally
submitted BOO 527
CFIANE, P A Pacifir tias t. Elecfcrit Cn BO/O7/01 lp
— 8007070206 Revision 1 to "Description of Sy-s Interaction Program for
Se i smica 1 1 ij-lnduced Events "
• Pacific 0.35 I. Electric Cri SO/Ofe/lO 77pp
S0071AO392 Forwards Std Order For DOE Work. "Bijs Interaction Suppoi t
for DiatiSn Canyon. " issued to LLL
RQSE.D F Division of Systems Integration FIN A-Q248-O 80/07/07
IP
— BOQ71iD395 9td Qrdar for DOE work "Sy s Interaction Support for Diablo
Canyon. " issued to LtL
QREMIER. Q Office of Standards Development' Director FIN
A-O249-O BO/07/01 app
000723002*7 HotiFitatlon OF BOQ71R meeting lu/util in Bethesda.MD to
rev i BUI auiiliarij Feediua ter su,s reliability study
BUCKVEY.B C Licensing Branch 3 aO/O7/QB 4pp
8007360.089 Summary oF BOQal7-19 sitp visit tu/NRC.utll & two intervenors
re audit of SUB intBractinii program for sc i irnical ly-inducad
events Program is sound (< can be satisfactorily completed
Indepandent uslkdoun do-scrip tion end
THOMAS. C 0 Systems Interaction Brant I) 30/07/07 B(> p
B00716Q520 Forwards draft Operating Procedure OP-SB, "Anticipated
Transient W/n Triji. " per AC Ttiadant request Prncedure
should not be Eiitibi d-ered part of Joe let file supporting QL
application
CRrtNE.P A Pacific Gas 6 riectric Co BO/O7/10 lp
— a0071fcOB21 "flnticipa tei Transient W/o Trip." Emergency, operating
procedure
« Pacific Oas. I< Electric Cn EJO/OJu'O? Spp
SO 0733030 Q Discusses augmented leu poiuer startup test program Far
neal — term DL applicants ETach applicant must perform tests
similar tn TVrt [truposed program President Carter 7^1207
statamcnt on KooiBny Cafflmission rept encl
E1SENHUT, D e Division nf Licensing 90/O7/11 bpp
8007180340 Foruerds Revision 3 uf "Description oF Bys IntBl-actlon
Pro-grara For li^i arnica 11 tj-InducEil Events "
CHANE, P A Pacific Oas !. Electric Co att/O7/l3 lp
— 8007160344 RBviBion 3 to "Description of Bys Interaction Program for
Saisraical lij~lnduced Events "
« PaciFit fias !, Electric Co 90/O7/09 77pp
8007230550 Moti Fit-ati on of 8007H9 meeting u/util in Bethead*. MD to
discuss auilliary f oetluifl lor si|t Meeting ar-iglnolly ftche-duleit
for QOO71B
BUCKLEY. D C LVEBnstng Dranc!. 3 80/07/17 3pp
BD0731D377 AdvUua that R HcMullen response to Quoatlon 9 of ASLAB-398
accurately reflects U3SB pOBltion AinbiDuitjoB in location of
earthquake require confiervati vc nssumptian that all faults
have *artho.iiafc R potential
MORRIS. Fl H IntOTiar.Dept [if, Qool ogical Survey BOJO7/S9 lp
spurt CECfO. Euppls tf coireBpondgnce
5pp
irector NUREQ-04.78 89
on pi am
ninj) & qualification
<J Ad jud i catory cor respondonce
BQ 07 030 04 a Request far participation in tutcuritij plan hearing par ABLE
771116 order admitting State of CA in QL, procoading
Participation ui 1 1 asnist In adequacy & uiarkah 1 1 i ty
aa«essment« Notice of appearance b Certificate! of Svc snc 1
BnOUN.H H , KLINE, J A California. State of DROWN, H H Hill
Christopher I. Phillips BO/04,/11 9pp
B007140026 Acfc receipt of Cotnmi salon BOO611 memorandum fc order. CLI-BO-
24. on behalf of San Luis Qbispo Mothers Par feace Adherei to
prior position ro Coramisoioner Hendrie participation in all
aspects of DL proceeding re seismic & safetg issues
JDNEB. V 1 Junes. Groy I, Bayley BO/06/1B Spp
800710019B Eipresses appreciation for NRC permission allowing joint
intervenar ropre&enta t ives to participata in S00iil7-19 >ys
interaction audit at util NHC has demonstrated uillingniBi
to assure public participation Related correspond once
FLEISCHfiKEfl, D B Fleischaker, D S BO/O6/33 lp
BOO7310a43 Forwards Commission BOOSS7 memorandum ti order cont«ininn
decisions on UCS 7B0302 petition for reconsideration of
7BD413 niBmoranduni tt order UCS 771104 petition sought action
ro Firo protection for electrical cables
EISENHUT.D 0 Division of Licensing BO/06/ZS B9pp
BQ0730Q-U9 Notice of appnarnncH in procBBdlnfl Certificato of Svc encl
GEDROIDU. n S Colifornia, State of HO/Oi/30 4pp
B0070701H3 rtdviaes of stipulation in DL proceeding, el imlnating legal
argument re wording of affidavit of nondisclosure t public
dissemination of info Governor Brouin of State Of CA did not
take part In stipulation
TdURTELLOTTE, J Hearing Branch 4 JDNEH. Y . NOJ1TQN, B Pacific Oaa
tt ElectrU Co 00/07/02 2pp
BO0711OOO2 Order granting eitenelon until B007SS far Conunls»lon to
elect to rcvieu decision on onFov CBinent action request*
HD-BQ-33
HOVUGi J C Office of the Secrotanj nf the CommiBSion BO/07/OB
B007ia04f)S Motion for OLs pormittinfl fuol loading, Initial criticality
process t< loui pouer tec-ting Priiposed operation may (ID
conducted during appeal from ALBD 790927 partial initial
decision W/documentation. a Ff idavl t tt Certificate of Bvc
qnftNE. P A Pacific Oae. t, Clectric Co QCMR. A C Bnell !< Hllmitr
NDRTON.n Brute Norton 80/O7/14 13pp
B0072H0093 Memorandum t< order flmonilinD t< reissuing AGLAD B00403
protoctive order re aecurity plan Governor oF Crt request for
pertic ipatlon us interested state granted w/certain
tonilttiona Sets timetable for future proceedings
B3BHDP.C J Atomic Safetij and Licensing Appeal Pnnol SO/07/ IS
SSff
— 8007320103 Amended protective ordor permitting Hmitnd acctii to S»n
Luia Obiapu Mothers for Pence fc Governor oF CA re security
plan Info Amended affidavit of nondisclosure encl
BISHOP, C J Atomic BaFBty and Licensing Appsol Panal BO/07/19.
7pp
B007S3O500 nen.uo5t For recone i deralion at ASLAB B00624 dee i *ion. ALAB-
590, or certification of M Tri f anac t< E Luco teatimony on
79101D Imperial VallBij earthquake Urgna appropla tion of
Funds to Facilitate testimony Certificato of Bvc encl
PLEISCHAKER, D B. JOHNSTON. H P , PHILLIPS. J San Lula Obispo Hothur*
for Peace 80/07/17 6pp
B00731O46A Notice of PC Valentino & VI .Innes withdrawal (, MA Baldwin
designation as lead counsel in proceeding Certificate of Svc
encl
VALENTINE,!1 C , JONES, V 1 Ban Luis ubi«po Mothers for Peace
BQ/07/1B Spn
000733053k Motion to chnngo lead counsel designation Cram JR
Tourtollotte to WJ Olmstead Notices of HJ Olmstead b LL
Swart i appearances. JFt Tourto) lotto viithriraiiial Si Certificate
of Svc encl
uLHSTEAD.W J . TOURTELLOTTC. J Hearing Branch 4 8D/07/S1 6pp
QOO7300I10 Notice of flppBarnnce in procesding
LANPHCfiiL C California, BtBte of LrtNPHERrL C
Phil lips BQ/07/21 lp
Hill Christopher
DOCKETED ITEMS
159
0007350429 Statement in support of joint in tervenors * BQO717 ruquo-It
For reconsideration of ALAH-59B, or for rerti Citation of
question ro Mihai loi Truf unac ti Enrique independent vleuisi to
Commission Urges Funding for Trifunac t, Luco
BROUN. H H . KLINE. J A . GEORQ1QU, D B California. State oF
BO/07/24 2pp
0007300096 RequEBt by joint intervenors for intension until 800B01 to
respond to applicant motion for 1 oui power testing license
Counsel out of touin Certificate of Svc end
FLEISCH-1KER. D S Ban Luis Obispo Motheis for Peace FLEISCHAKER, D S
Fleisehaker, D B JOHNSTON, M P Center for Law in the Public
Interest 80/07/55 <lpp
BOO731O461 Discusses handling tc delivery of sensitive security matl
between parties
BLMSTEAD, H J Hearing Branch 4 BO/O7/2B 3pp
H General correspond ence
0007140084 FOIA request for NRC insp rept far Atomics Intl, info
concerning THI incident fc status of licensing proceedings
for facility Newspaper articles end
MILLER, T Affiliation Unknown BO/05/OB 6pp
0007140016 Ack receipt of and & irt forma recipient about progress tt
•xpactation of required cultural t historical mitigation
program Ltr forwarded to NFtC for consideration
NIEL6EN, A D Interior, Dept of 80/06/18 3pp
Q 0070 100 63 Expresses regret that failure to add Society for Environ
Awareness to mailing list for uet-Hij public announcements on
fact 1 ity. resul tetl in necessity to duplicate request Addition
made to distribution list
INQRAM.F L Office of Public Affairs 8O/06/20 Ip
B007140021 Responds to FDIA request for NRC map rapt re Atomics Intl,
Info concerning THI incident & status of licensing
proceedings for facility Forwards or Stein B00220 memo,
Sept 1977 EIA li 770900 BEH H/EIA I> SCR caver sheets only
DENTQN.H R Office of Nuclear Reactor Regulation, Director
00/06/33 Qpp
6007010457 Opposes granting license for loui level testing far utllidue
ta health & safety concerns re emergency p lanniiig, radiation
monitoring *t inPety issues based nn THI No testing should be
allowed until conversion possibilities explored
CLUCA9,J A League of Women Voters of San Luis Obispo.CA BQ/06/24
8007090218 Requests that NRC deny OL to facility Too much emphasis
placed on possible earthquakes along Hosgrl Fault t< not
•nough concern on entire area of instability Conditions
create distinct possibility For formation of more volcanoa*
BNAPP.C Affiliation Unknown 80/07/01 lp
BQ07230277 Reiponds to 800&03 Itr re RH Leddu. concerns about proximity
of Hosgri Fault to Ulo h ability of facility to Withstand
sever* earthquake Fault is 3 5 miles from site Hatter oF
seismic xituation currently pending before A9LAB
DIRCK9.H, J Office of th« Enscutive Director for Operations
0Q/07/02 6pp
— 8007230394 Requesti response to eric 1 RH Leddu, concerns about proximity
of site to Hasgri Fault
LAODMAR8INO, R J House of Rep . Foreign Affairs BO/06/03 3pp
8007290o47 Urges lhat NRC deny OLs for facility due to pro»imity to
Hoigrl fault (< to prot*ct heal th, »af etij tt latifara of people
of CA
ALLEN.B D Affiliation Unknown BO/07/21 2pp
O. Inipaction reports, IE Uulletins ti correspondence
B007220337 Foriuards IE Infn Not up HO- 36, "Cvdl uat i on of Contractor
QA Programs " No written response requited
FNQELKEN,R H Region b. 3,in rram.i--.io, Off ir e of the Director
BO/0-6/ 1O lp
8007290006 Forwards 1G InFo NatiLe FIO- 2B. "Prompt Reporting of Info in
Accordance W/10CFR3O IStp) " No written response required
ENOEUKeN.R H Region 5, 'iafi Francibto. Office of the Director
00/06/13 lp
ao-072SOt3n Responds to IE DuHeim 79-21*, "(-allures of Wostinghouse
HFD Flelays in Baf oty-Flelatei! Sys " Subj relays not used
or planned for use in safety -rol.iteU SIJG at plant
CRANE, P A Pacific Ons '. Electrn. Co QO/06/ifa lp
S00703OOI7 Forwards IE Bulletin BO-IS, "Possible Loss of Emergency
Notification Sya (FNS1 M/Lo«5 of- OfFsite Poiuer " Written
response requirod
ENQELHEN.R H llegion 5. E.m Trancisio, Office of the Director
QO/OA/1S lp
BOO7O2O-I74 Foriuards IE Cirrulor BO-15, "Loss of (?e-actur Coolant Pump
Cooling fi Natural C irrul all on Cooldoun " No written response
required
ENOELKEN.R H Region D. 5nn rrantisco. Office, n P the Director
BO /Oh/ 2O lp
BOO71BOP07 Forwards IE Circular BO-1'1, "fiad t oattive f ontaminatlon oF
Plant Deminerali led Wutar !lys !i Resultant Internal
Contamination of Personnel " Nn written response requirad
ENO£LKEN,R H Region 3. San FrsntiHCO. tlffire of the Director
BO/06/21 !p
BOO7^30385 Forwards IE Dullctin QO-lu, "Potential Mi sapp 1 ication of
Flosemount Inc Models 1151 !i 1193 Pressure Transmitters
H/Either A or D Output Codes " Written reoponse required
IE Circular BO-16 also end No written response requlrad
ENQELKEN.R H Deglpn 3, Sdn FranLlsiD. Office of the Director
BO/Ofa/27 lp
BOQ730Q2BO Responds to IE Bulletin BO-Q3 re vacuum bBTia^e to chemical
vol control tank tijs All five tanks protected against
failure under vacuum conditioi.5 OCB drain tanh designed to
withstand eitornal pressure of 15 (1319
CRANE,P A Pacific Gas ft Electric CD 80/07/07 Spp
8007310321 Forwards IE Insp Rupts 90-873/80-14 !- 50-323/BO-07 on
9006O1-20 NO nctncnmp 1 lance noted
CREWB, J t Region S, 6an Francisco, Reactor Operations Nuclear
Support Brancli BO/07/1O £!iip
— B007310327 IE Innp RoptB 50-?7lj/BO-l') «c 5O-3Ba/at>-07 on B00601-20 No
noncompliance notod Major areas inspected preoporatsonal
testing, p lant tour. Fuel stoi ago, opuratar tramtng ti
uitnessino of testing in progress
VDUNO.T , BAOAQLID-M Roflion 5, Ban FrsnciBco, Office of the
Director 8TERNDERO, D M Regtiin 3. San Francis-en, Reactor
Operation* Nuclear Support Branch 00/07/03 3pp
DOCKET 30-334 BRUNBWICK BIEftM CLFCIRIC PI-ftNT, UNIT H
F Security, medical, emergency *< fire protection plans
8007010324 Informs NRC that ut H will -lulimil rev it Ed emergency plan in
Aug 1")QO Implementing prcicndiiree for emprgimtij plan will be
developed by BOISOI d coipplrca plrtn implemented by B1OI01
per NUREG-06S4 rcqui rements
UTLEYjE C Carolina Pouor !. 1-ight Co SO/06/37 ip
8007010342 Advises that add! info ri> safeguards cqntjnjenctj plan whlth
was requested In NRC 800327 Itr will be suhfflttted by
BODS01,
UTLEY.E C Carolina fouler & light Co BO/06/37 lp
80072BOA97 Forwards responie to IE Bulletin 79-27, "Loss of Mon-Clasfr
IE Instrumentation fi Control Power 9l|B Bus During
Operation " Loss of power to Class IE buses is audibly h
visually indicated by control room annunciator
CRANE, P A, Pacific Oat (.Electric Co BO/Q4/J8 ISpp
B007170893 Notifies thai- intriKe strutmru basompnt areaa at facilities
have been selected aa po&dibh' tfHt i,u(ij to conduct teats
on fire protection sijs In rpspunstt tn NRC BODBHa order
Requests agreement to participate in program
EJBENHUT. D 0 Djvislnn oP I icpnsing SO/07/OB 3pp
B0072401B7 R»spOTl(t* to IE Bulletin BO-04, "Analysis of PUR Mjiin Steam
Lino Break M/Contlnued Feeduater Addition " RBVieui rasul ts
indicate no potential for containment overpressure or
uornnino of return to pouur response
CRANE, P A. Pacific Oat & Electric Co £0/O4/ao Epp
8007020242 Forwards IE Info Notice BO-22, "Qreakdouina In Contamination
Control Programs " No written responaB r-equired
ENOELKEN,R.H Region S, San rronqisco, Office of the Director
ao/09/aa ip
6 Ail judicatory corrtrspondcnre
B007310243 Fqruards CoflimlBBion fl(JOSJ7 momn rand urn d order containing
daciaion5 on UCB 7B0503 petition For reconsideration of
760413 niumorandun % order 1ICU 77110'! petition sauglit nctlo-n
ro fire protfLtion Par ulcctrlral cnblus
EISENHUT. D 0 Oivision of lirenbinji QO/Ofi/25 8?pp,
160
60070^011)8 Rcspnnrts to 30QS16 Itr re l"udiu Alliance concerns about
ability of util t« safely utilile nuclear power NRC monitors
Shejron. Kirns con^t to assure eonPormanco u/requirumenta
Levels oF contamination froir Drunsuiick no threat to public
DIRCKS H J Off iff of the Exi'CUti/e Director for Operations
30/Oi/ IfJ 2pp
--HOQ7020LM/ npiiiBitc. rpsponsi' tn encl Kurtiu Alliance 800512 itr
commenting on aTiility nf util to safely utilne nuclear
power
ANDHEWb. 1 House of Rep I10/Q5/16 2pp
ISOQ7S3OOSB Summary H f BOOP07 meeting lu/Msrk I ounera group ih Bethooda,
MDi Te revisions tr- HOC ncrfptancp criteria ti outstanding
issues relative tn Mark I containment long-term program
GRIMED C T Plant Systems Branch 80/02/31 3Ipp
80O7Q.IQ'133 roruartls resjumin to NflC £100507 request for evaluation of
applicability to Facilities of Ot B003BI responses
ro concerns pra.ided by ACH5 c onsultanti C Nicholson,
re add! Till -2 iciiited requirements
UTLEV.E F Carolina Power I, Light Tn aO/Oft/27 6pp
B0072JO-4I5 Di'.CLjjrpi 790531 commjtmpnt to installation of mods required
by Marlt I cont.i inmpnt program during 1900 J. HI Complete
incorpuratian nf NRC input into GE load definition rapt
scheduled for mirl-Jul 19BO
UTLEf.E C Cornlina Pouer '. Light Co BO/07/14 2pp
B0072-7O723 Buhmit^ dddl info re dden,urtty of station electrical
distribution sys, vnltjge. in rfiponsn to NRC B003I6 Itr Info
for incomplete; Items 2 I. 1 will hr iutmi tted by 80102fl fc
0926. respectively
UTLEV. E £ Carolina Pouicr !. Light To BO/07/34 7pp
8007020715 ForuarUs IE BuUetin (iO-13, "Pos"-.! b 1 e 1.055 nf Emurgeniu
Notification Sijh (CNS) H/Luss uf Uffsite Poiuor " Urittnn
responue requn oil
D'REILLV.JP Region 2, Atlanta Office of the Dirpctor 80/Oh/lB
lp
BO07020140 Formards IE Cn culnr 60-15, "Loss of Rose tor Coolant 1'itmn
Cooling t< Natural Circulation Cunl douin " No lunttHn maponae
requirod
d'HEILLY,J P ReQion ^, Atlanta, Offico of tho Director BO/O6/ao
B0071Q035d Act receipt of BOD61O Itr informing NRC of atopo tokon to
correct vialntions noted in IE Inap Ropts DQ-324/BC— 10 !>
50-335/80-11
MURPHY, C E flrpion 2. Atlanta, iieactnv CoiiGtruction !< Enflinenriiiu
Support Branch flO/06/24 lp
—9007100367 fie k receipt of 800512 Hr informing NRC of itapo taken to
cnrrsct violationa noted in IE Insp tlepto SO-324/BO-1Q t
^0-^35/00-11 Per B00532 telcon. 5U|iplemontal response ahould
bu prnvldei) by EJ006!3
rlURPHV.C E flegioii S, Atlanta, Reactor Conotruc tion & EnginoHriiig
Support Branch BO/03/23 lp
--B007100377 Rfifipond-i to NflC B0041S Itr re violation* notot) in IE
Insp Repta 50-334/80-10 5. 3O-325/BO-1 1 Cofractive actlonB
diesel engine insp uiaa porformod by manufacturer Periodic
tost Implemented ti hchoduled far Fire doors
TOLLISONiA C Carolina Pouier d Light Co BO/03/13 4pp
— S007100384 Forwards IE Insp Repta SO-:i2-1/BO-10 & 'iO-325/e()-l 1 on
B00331 fc 0401-03 t. notice of violation
MUIIPHY.C e Region 1, Plil lodolphia, Reactor ConBtrttetion ti
Engineering Support Branch 60/04/10 2pp
— BOQ710037D Notice of violation frnm insp on B00331 t, 0401-03
* Region 3. Atlanta, Office of tlie Diructnr HO/Ofl/10 tp
BOO729Olfi-f 'Eli-etDtal, Instrumentation L Control Aspects of Cvernde of
Containnnint Purge- Valve Isolation !i Other Safety Feature
iiignalB. Grun-,wii K Steam Electric PI. int. Unit 2 "
UDY.A C ECt-G ld,nho,Inc FEN A-6P3& B00729Q163 60/07/31 13pp
3 Inspection reports. IE Bulletins t, correspondence
BQO724GH3 Forudrdi IE Info Notice BO-20, "Loss of Decay Heat Removal
Capability st DaviE-Qesse Unit 1 While in Refueling Mode "
No response required
D'REILLV.J P fleyinn 2 Atlanta, Qffire of the Director BO/03/OB
GOD71404B1? Toruiar fls IE Bulletin 00-13, "Cracking in Core Spray
fiperqprs " Hntteit reinonse i-e-nuiroi]
O'FIEILLV.J P Renic-n S. Atlanta, Office Df the Director BO/O5/12
B0070201B7 Forwards IE Info Notnce 80-29, "BreakHouns In Contamination
Control Programs ' No uirittt'n response requlrnd
D'REILLYiJP Hegian E. Atlanta. Office of the Director BO/09/2B
B01D70101791 Foru^rds IF Info Notice BO-P3. "Loss of Suction to Emergency
O'SEIt-LV. J P Region 3. Atlanta. Office of the Director BO/05/29
IP
B0071704PO Foruiardi IE Insp Repts 50-324/BO-16 S. 50-329/BQ-19 on
B0051S-16 No imnrompliance rtotad
LEWIS.R C fiftgion a, Atlanta Reactor Oporationi Nuclear Support
Branch B(l/Q{,/(>6 2pp
— B0071704S1? IE Jii5ji Rept5 50-334/BO-I6 d 50-325/110-19 an 800512-16 No
tiotirompl irintfe noted Ha jar areas inspected maint, BurveiHance
ti talibr «f Tech Spec-relBted enuipmfnt ?< support equipment
MESSITT.Ii il flexion 3, Atlanta. Dfflco of the Director
UPRIGHT. C H Ri-ginn 2, Atlanta, fleactor Operations Nueloar Support
Qrojir h BO^Oft'Ob 6pp
800732004:) Fariifarrio IE InFn Notice HO-Sfi, "Evaluation of Contractor
OA Programs " ND written renponse required
O'BEILLV.J P Haflion 3, Atlanta, Office op the Director 60/06/10
oo-?l4QSa* Foruiardg IE Bulletin 00-14, "Degradation of DWR Scram
Discharge Vul Tapsinlity " Written response renuired
O'HEULV J P Heflion 2. Atlanta. Office of the Director BO/
2pp
BO/06/13
— B00710039B Notice OF deviation from insp on B00331 !. 040I-O3
* Region 3, Atlanta. Office of the Director BO/Ofl/lH tp
— B0071004I3 IE I n*p Repts 50-324/130-10 <i 50-3SS/QO-11 Oil S00331 &
0401-03 NoncompliancB noted in.idequate surveUlanco
procBduros for fire protection Eys *i inodequnte revieu of
Fire protection Tech Spec violations
CQNLDN.T E fienion 2, Atlanta, Reactor Construction t, Engineering.
Support Branch MILLER. W H Region 2, Atlanta, Office of the
Director SO/04/ IS "?pp
0007160BOO Foruiards IE Circular BQ-lfl, "Rad inQr tivu Cnntamlnotlon of
Plant Dcmineral nod Water Bys !. Rusultanl Internal
Contamination or Personnel " No uritten rosponKe required
O'HEILLY,JP Hoaion Z, Atlanta, Offico of the Director BO/06/H4
B007010135 Torwards rnrrected PHQCS I1-3S !< 11-36 for revised inservicn
insp program for pump (. valvo testing, submi ttetf on 800337
UTLEV.E E Carolina Power !. Light Co 80/Q6/2S lp,
—8007010431 Correctefl Pages 11-39 !, II-36 for "InaorvicB Insp Progmm,
Program !< Value Testing "
* Carolina Pouer !< Light CD 00/06/2S 2pp
B007S30220 Forwards IE Bulletin BO-16, "Potential Misapplication of
nosemotmt Inc Models 1151 !< 1113 Pressure Transmitters
W/Either A or D Output Codes " Written response required
IE Circular SO-16 also encl No written response required
O'REILLY, JP Region 3, Atlanta, Office of the Director 80/06/27
8007220260 Responds to IE Bulletin 60-10 Routine sampl ino, analys la &
monitoring program establialiBd to promptly identify
contaminating events that could lead to uncontrolled
relBasoE to environ
FUHR.Q J Carolina Poiunr d Light Co BO/07/01 lp
BOQ71705I6 Responds to IE Hulletin 90-08. "Elimination of ContainmBnt
Liner Penetration Uelda " All final melds rad iooraphed &
resulti of const nond instructive examination acceptable as
final
FUfiR.B J Carolina Power & Light Co BO/07/O3 2pp
8007340189 Responds to 800611 notice of violation fc notice of proposed
imposition of tivil penalties Boiler removed from avc for
decontamination, repair (.mods Radiological operating limits
established Civil penalties Fee end
FURR.B J Carolina Poiuer !< Light Co 80/07/03 7pp
— B007S4019i Responds to NRC request for info re 7Q0426 occurrenc
resulted in onsite contamination of ares around raduaste
oldg Calculations Indicate appro' SOO gallons of uaste uas
drawn into steam line
TOLLISON.A C Carolina Payer t, Light Co 7B/Q4/3B Spp
--SQ0723047D LEF1 BQ-040/OJL 0 on 8006^3, Iru level switch 3-021-LI5-N03] A-
I unulri nut reset then noiinal reactor uater le/el Lias
simulated Cnuspd l>y stuck contacts Defective sultch
i op laced I. cal i br
TQLLISON.ft C C'urnllna Power t, Light CO 80/07/li. In
0007310149 Forwards response to NF1C 800611 notice of violation 6 notice
of proposed imposition of civil penalties re onslte
contamination of area around raduiaste bldg Corrective
actions boiler decontaminated & repaired Penalty fee entl
FUflR. fl J Carolina Pouier t, Light Cn BO/07/03 1PP
BOO/220331 HO i-BO-D? confiims 900716 telcon re not» Fitation by Of of
incorrect use of total packing fix tnr fni ad justing gain of
average POIUET r.itifli monitors Caused |jy intorrett reF value
Tech Spec values tn be changid
TCILLISON, A C Carolina I'ouiBr !, Light Co 80/07/1 / 3pp
BOQ7BBOU1 Foriuards response to 1C Bulletin 80-11 Response includes
general arrangement draining^ indicating, masonry uial IB Also
forwards data shoots re each uiall H/o ends
FURR.B J Carolina Power fc Light Co BO/O7/Q7 lp
fi007SSOa9i Responds to IE Bulletin 80-17, "Failure of Control Rods tn
Fully Insert " Ho mater observed in scram discharge vol
Timlnfl of vent & drain valves completed
RJRRV, B J Carolina Pouter & Light Co SO/07/ 10 2pp
0007250334 forum ds LEO HO-04V/OJL-0
TDLL1BDM, A C Carolina Poucr >, Linht Co QO/07/17 lp
— BCWa-iOaiH LEO 00 -049/Q3L-0 on fl0070], during porFormancB of high
dryuell pressure chiinnal pressure & functional testp
tachnicians Found piessiire suitch 2 -C 7 2 -PS- HO 02 B actuating
out nf tolfiranci1 Caused hy instruniL'nt drift
C {.nruliiid J-ounr I. Light Co BO/0//1/ lp
8007190192 Responds to NRC 1 tr re violations noted in IE In«p Depts
SQ-324/BO-20 t, 30-32S/ao-23 Corrective actions ISI program
raorgBnl led t< future submittals mill be accurate ti complete
QA Procedure S3 written & approved to correct Items S b 4
TDLLI90N.A C Carolina Power t, Lipht Co BO/07/U 3pp
8007300561 Responds to IE Bulletin 80-13 No cracking indications noted
in Unit 1 cure spray sparger or in-vousel piping Unit S Imp
ulll be performed at next refueling outage
FlfflR.B d Carolina Power & Light Co 80/07/15 lp
800/310206 SuUmltB supplemental response to IE llulletin BO-07 ra uWfi
jet pumps No Indications discovered either by vlaufll or
ultrasonic insp
FURR.B J Carolina Pouer lc Liflht Co BO/07/15 lp
Q00731030& Reipands to IE Bulletin 7<?-fl3A, "Longi tuiinal Held Defects
in ABItE 9A-312. Type 301 Stainless Steel Pipe " Plpinj specs
do not permit use of A-31H, Tijpe 300 series fusion ueldod
pipe In aafetu-related syt
FUnft.O J ' Carolina P timer & Light Co 80/07/13 lp
R Periodic operating report* b related corrBipondence
Q00711040B Forward t monthly operating repts For June 1980
TOLLISONiA C, Carolina Pouer t, Light Co BO/07/G3 Bpp
— B007ll010i Monthly operating rcpts for June 19BO
HIULIS, E Carolina Power & Light Co BO/07/03 Spp
S Repartable occurrencnti LEfts t< related correspondence
BOQ7oa0334 Foruiarda LER BO-Q4A/01T-0
TOLLIBON.A C. Carolina Power b Light Co 00/06/34 lp
—8007020361 LER BO-Q46/OIT-0 on BOOiJl. while norformtno insps p*r 16
DullBtin 77-01B> Bplicn connecting nuclear grade cables to
solenoid pigtail leads for valves found not environmental ly
qualified Nuclear grade splices being installed
TOLLIBON, A C Carolina Pouer I. Light Co 90/06/24 2pp.
8007160632 HO 3-80-47 uihlle ruplacinj nonqualified splices connecting
safety relief valve solenoid pigtails to nuclear grade
cable. di»cov»red that pigtails on solenoids mere brittle &
that insulation cracked when handled Solenoids unqualified
TOLLI60N, A C Carolina Pouier S. tight Co SO/Oi/24 lp
B0070SOS6O LER 79-107 has been cancelled
» Caroline pouier f, Light CD flO/07/01,
BOQ70HQ363 LER 79-10B hac been cancelled
•t Carolina Poiuer ft Light Co, 80/07/01 lp
B00714039S Forwards LER 80-047/Q1T-0
TOLLIBON. A C, Carolina Power h Light Cn
BO/07/08 lp
—8007140399 LEfi BO-0-J7/01T-0 Pn 000^24, uh He replacing nonitualiPieiJ
spile** connecting safety relief valve solenoid pigtails to
nuclear grade cablei brittle pigtails discovered caused by
adverse- reaction to tape adhesive Solenoid* replaced
TOLLISDNiA C Carolina Power t> Light Co, BQ/Q7JOB. Spp
0007320464 Forwards UER HO-04(3/03L-0
TOLLiaON, rt C Carolina Pouier & Light Co
DDCKGT 30-395 nnijfJSWICK STEAM EfECTHlC PLflNT. UH1T 1
F Security, fnuiticol. t-rHErgency 'i fire protertioii plans
00070103E4 Informs NRC that "til uill submit revised omergency plan in
flug 19BO ImplemBTitinp procedures for eiriergBncy plan mill be
developed bij BOI2O1 tr cornplt'tu plan imp lemoiileil by 010101
per MUREO-0634 roqulrBniunts
UTLEV, E E Carolina Pouar *i Light To 60/06/57 lp
H007Q10342 fldvist!, tliat arfdl info re tafeguarifs contingency, plan mhith
uas requested in NIC 000*137 1 tr uiill be suSmifcted by
aooaoi
UILCY,E E Carolina Pouier !< Light Co BO/Ot/J7 lp
Q0071703"i9 NotifiBs that Intake striicturo boaement nroas at facilities
have been StMpitPd as puanible tt>ht culi j Lu conduct testa
on fire protection sys in rBsponas lo NflC 80033^ order
flBauestD agreement to parttilpata In pr-OQram
CISENHUTiD S Division of Licensing BQ/V7/QB 3pp
O Arfjudicatory corrospondence
O0073IOe>43 Foruarils Coiwni ssion HOOBa? memnrainliira d order containing
decisions on DCS 7H05O2 petition for rpconsi deration nf
7B0413 memotdndum t> order UCS 771104 petition sought action
ro fire protection for electrical cables
CISENHUT.D 0- Division uf LiconsinB 80/06/aS RVpp
It QBiieral tnrrespnndencp
B00702Q198 HosponilB to HOD516 Hi- IB Hudiu ftlliame concerns about
ability of util to soFely utilua nutluar power NHC monitors
Bhnaron HnrriB const to aaauro confoimnncp ui/rEquirements
Levels of cpntominritiun from Rrutisuick no threat In public
DIRCK9iW J Office nf the Ciccutivc Director for Operations
E1D/D6/IB Sfp
— 8007020B17 HequL'sts responsP to end Kudiu Allionee 800312 Itr
commenting en abilit-y uf titil to 'iLifaly utilup nuclear
power
ANDREWS. I House of Dep QO/09/lh 2pp
P 0(i ura ting liconsc stjge documents & correspondence
8007HJ002a aummarij of 000307 meeting lU/Mar k I owners group in BetheKda.
MDi re revisions tn NRC acceptanre criteria !• outotand Ing
Issues relative to Harl 1 coritalnmont long-term program
GIUMES, C T Plant Systems Branch 00/02/S1 3lpp
Q007010416 Confirms 000619 conference isll u/BNL NHC.OE !. uttl re Fuel
Cycle 3 Util will perform startup physics testing on Unit 1
durina startup Prum current outage flE has confirmei) that
both unitt are Equipped D/tliei ma I power monitors
UTLGY.C E Carnlina Pouer E. Light Co 80/06/33 «!pp
80070-10423 Forwards responses to NftL 01)0507 requsst for evaluation of
applicability tn facilities uf OE B003ai retponien
re concerns provided lig ACfiS con-juHunti C Hlchelson,
re addl TMI-2 related requirements
(JTL€Y,E E Carolina Power t< Light Co BO/06/27 i>pp
S007H0605 Foiwards Amend 2V tr. LlL
notice of issuance & availability
IPPDLITD.T A Operating Re.ictor-, Qranch
DPft-71. safetii evaluation
BO/07/01 flpp
B007140614 Amend 31 to License DI'R-7 1 , chang ing Tech Specs to establish
revised safetij >i operating limits for Cgcle 3 operation t,
safety relief valve pressure (etti-ngs to provide min nominal
lift setting differential of 30 psi
IFPOL!TO,T A Operating Fteattors Branch 3 BO/G7/01 23pp
BD0702Q74B Fnrmards IE Bulletin BQ-15, "Possible Loss of Emergency
Notification SIJE (ENS) W/Loss -of Off site Power " Written
response required
D'HEILLV, J P Region 3, Atlanta, Office of the Director BO/06/ IB
-B007I40616 Safety evaluation supporting Amend 39 to License DPA-71
« Operating Reactors Uranch 2 BO/O7/01 10|>p
-6007140624 Notice of Issuance !. availability of Amend 29 to License
DPR -71
IPPDL1TD.T A Operating Reactors Branch 3 QO/07/O1 Sop
007210415 Discusses 790531 Lommi t rrienl tn ins tol la t ion of mods required
by Hark 1 containment program during 19BO tt Bl Complete
intorp oration of NHC input intu BE load definition rept
scheduled for mid-Jul 1900
UTLEY.C E Carolina Pouer tc Light Co 9O/O7/14 2pp
307340437 Forwards corrected Page 3/4 a-7 of Tech Specs attached to
800701 Amend 21 to License DPfi-71 Amend should ref Fuel Type
PHDRD265H Also forwards corrected safety evaluation to. Amend
E?
IPPDL1TQ.T A Operating Reactors Branch E BO/07/15 3p p
-B00724QQ33 Revised page to Amend 31 to License 31PF1-7 1 , corr ectino, ref to
Fuel Type PBDHDSfiSH
IPPDLITO.T A Operating He-actors Branch 2 CO/07/15 lp
-B007240441 Corrected safety evaluation supporting flmend 39 to License
DPR -7 1 Corrects incorrectly numbered pages
» Operating Reactors Branch B aO/O7/Ol I I p p
3072 g 072 3 Submits addl info re adequacy of station electrical
distribution sys voltage, in response to MRC S003I6 Itr Info
for incomplete I terns 3 tc 3 mill be submitted QU. B01024 &
0936. respectively
UTLEV.E E Carolina Paiaar t. Light Co BO/O7/24 7p p
007230306 "Elec trlcal, Instrumentat ion I. Control Aspects of Dverrido of
Containment Purge valve Isolation !< Other Safety Feature
Slgnalai Drunsiuick Steam Elec trie PlnntiUnlt 1 "
UDY. A C EGdG IdaHo, Itic FIN A-AS3& SD072503O& BO/D7/31 13pp
Inspection roportE, IE Bulletins t< corrosp ondcnc e
307340113 Fnruiardt IE Info Notice BO-3O, "Loss of Detaij Heat Romoval
Capability at Dnvis-Da^se Unit 1 While in Refueling Mode "
No response reqmred
O'REILLY, J P Region 2, Atlanta, Office nf the Director- BO/O5/QB,
Ppp
3071101B9 Foruards IE Bulletin BO-13. "Cracking tn Core Spray
Spargers " Written response rEHUired
O'REILLV.J P Region B, Atlanta. Office of the Director QO/OS/12
D0703QJB7 Foruards IE Info Notice BO-23. "Dreakdouins In Contamina t ion
Control Prosrams " No written response rciquiroii)
D'REILLV.J P Region 2, Atlnnta, Offiia of the Director QO/OS/aB
307010179 Forwards IE Info Notice BO-23, "Loss of Suction to Emergency
Feeduater Pumps " No written rpoponse required
O'HEILLV.JP Region a. Atlanta, Office of the Director 00/09/29
lp
J07170430 Forward! IE Insp Rents 50-324/BO-16 & 30-323/80-19 on
BOOSie-16 Mo noncompliance noted
LEWEB, R C Region Si Atlanta., Reactor Operations Nuclear Support
Branch 9O/06/06 Spp
-9007170139 IE Imp Rept» 50-3E-4/aO-li & SO-329-/BO-19 on BOO512-ld No
nontompliance noted Major areas in&pBct&d ma int. surveillance
& calibr of Tech Spec-related equipment d support equipment
MEBBITT.B R Region S, Atlanta, DFPiee of the Director
UPRIGHT.C M Region 2. Atlanta. Reactor Dperatlonm Nucloar Support
Branch QQ/Oi/05 (jpp
107330043 Forwards IE Info Notice BO-Pi, "Evaluattotl of Contractor
flA Programs " No ujpitten response required
O'HGILUY.J P Region 2, Atlanta. Office &f the DiToetor BO/06/ 1O
2pp
307140289 Fovu/ards IE Hulletin BO-14, "Deflradatlon of BWR Bcram
DischargB Vol Capdbllity " Written response required
O'REILLY, J P Region 2, Atlanta, Office of the Director 90/06/12
Spp
B007O2044O Forwards IE Circular 00-15, "Loss of Reactor Coolant Pump
Cooltnff ti Natural Circulation Cooldown " No urltt«n renponit
required
Q'REILLV.J P Region 3, Atlanta, Office of tn a Director GO/06/SO
IP
GD0710033& Ac k receipt of BD06IO Itr informing NflC of itupi talian to
correct violatione noted in IE ln«p Repts 30-334/BO-1O &
30-339/00-11
MURPHY, C E Region 3, Atlanta, Reactor Construction & Engineering
Support Branch SD/Oo/24 lp
— BOO7100367 Ac k receipt of OOD51S Itr informing NRC of »tap» taken to
correct violations not»d in IE Insp Repts 30-334/BO-10 b
30-333/80-11 Per 00052-2 tfll ton, siipp 1 ementsl reapon*a thauld
fre provided bu B00613
MUOPHV.C K Region S, Atlanta, Reactor Construction h Engineering
Support Branch BO/03/33 lp
— B00710O377 Responds to NRC BOOtlB Itr re violations noted In IE
Insp Hapts 50-324/BO-10 & 30-335/00-1] Correitlve actions
diesel en-Bine inip was performed bij manufacturer Periodic
teat implemented b schiduleij for fire doors
TOLLISDN.A C Carolina Power t. Lioht Co BO/05/12 4pp
— BQD71003B4 Forwards IE Insp Repte 30-324/00-10 & 30-335/00-11 on
B00331 t, 0401-03 t, notice of violation
MURPHr, C E Region 1. Philadelphia, Reactor Conitruction &
Engineering Support Branch DO/04/ IB Spp
— B00710O393 Notice of violation from imp on 80O331 h 0401-03
* Region 3, Atlanta, Office of tho Director 80/04/1Q lp
— B00710039B Notice of dtvistlon from insp on BOO331 h O401-03
« Region 3, Atlanta, Office of tho Dir»ctor CO/04/1B lp
— 9007100113 IE Inap Repta SO-334/BO-10 & 3O-3as/BO-l 1 on B00331 S.
0401-03 Noncorapl lance noted, Inadequate surveillance
procedures far fire protection BUG & inadequate revleu of
fire protection Tech Bpec violation!
CONLQN.T E Hejlon a, Atlanta, Reactor Construction t Gnolneerlng
Support Branch MILLER, W H Rvglc-n S, Atlanta. Office of th»
Director 90/04/1B 9pp
BOO7160BOD Foriuards IE Circular SO-14, "RaUlOBCtl vo Contamination of
Plant Derninerallied Hater Bgs h Resultant Internal
Contamination of Porsonnel " No ufltten retponn required
O'REILLY. J P Region 3- Atlanta, Office of the Director 60/06/24
BO07010425 Koruiards corrected Pases 11-33 b 11-36 for r«vl»«d Inservio
insp program for pump b valve testingi submitted on S00327.
UTLEY.E E Carolina Power b Light Co BO/Ot/2S lp
— B0070IO431 Corrected Pages 11-33 fi Il-3i for "Inservlce Imp Pragrtti,
Program d Value Testing "
< Carolina Pou.r b Light Co, 80/06/23 2pp,
Q0072303SO Foruards IE Bulletin 00-16, "Potential Misapplication of
floiemount Inc Hodele 1131 t, 1132 Pressure Tranemitters
W/Elthar A or D Output CodB* " Written response rBqulred
IE Circular 80-16 also encl, No urltten re&ponsB required.
D'REILLV.J P Region 2. Atlanta, Office of the Director, QO/06/Q7
Jp
DOQ78202&O Responds to IE Bulletin BO- 10 Routine sampling. analysis fc
monitoring program established to promptly: Identify
contaminating events that could le-ad to uncontrolled
release* to environ
FURR.B J Carolina Pouer S. Liflht Co 00/07/01 lp
B007170316 Rtspondt to IE Bulletin 90-08, "Examination of Containment
Liner Penetration Uelds " AH Final weld! ratliogr*phed l>
results of const nondestructive examination acceptable as
final
FURR.B J Carolina Power t, Light Co GO/07/03 Kpp
B007340189 Responds to BOOA1 1 notice of violation fc notice of propaetd
Impoiition of civil penalties Boiler removed from tvc for
decontsmlnationirepalr t, mats Radiological operating Hmiti
established Civil penalties fee encl
FURR,D J Carolina Pouer t, Light Co BO/07/03 7pp
-BO07340196 Responds to NRC request Cor info r-B 7BQ434. occurrence which
resulted in on»ite contamination oF area around r*J waste
bids, Calculation* indicate approi SQO gallon* at unto ua-s
drawn into steam line
TOLLISQNiA C Carolina Power t, Light Co 78/04/2B Spp
— BOQ7Q70237 I EFI BO-050/Q3L-0 on OOOAOB- ufi i In performing fBnttor 111
ventilation radiation monilQiino i«« tfrBl.woni tor
DlB-Rtt-NOlOB fsiloil to trip ventilation »ui fc start
standby gaa trains Gounod DM stuck relay 3DA
TQLLISDN.A C Carolina fouier 6, Light Co nn/Ob/3'f In
BO073104W Forwards response to NRC BOD61 1 notice of violation tt notice
of prop o Hid Imposition of civil penaltits re on»it»
contamination of urea around radwaBta b Idg, Corrective
acticms boiler decontaminated & repaired Penalty fan end
FURRiB J Carolina Power b Light Co BO/O7/O3 SPP
BO07280111 Forwards response to 1C Bulletin 80-11 Rveponi* Includes
general arranoement drawings indicating masonrg uiilli Al»o
forwards data shn»t» r* each mall W/o ends.
FURRiB J Carolina Power & Light Co BO/07 /O7 lp
8007250296 Responds to IE Bulletin 80-17, "Fallurs of Control flodi to
Fully Insert " No weter observed in scram discharge vnl
Tiaiing of vent I> drain valves completed.
FURRY.B.J Carolina Power tc l-luht Co SO/O7/1O 3pp
B0071SO472 Responds. to NRC Itr rt violations noted In IE Insp Rvpti
BO-324/BO-20 & 30-323/80-23 Corrective actions IBI program
reorganlitd li future submittals uill be acturat* fc complete.
OA Procedure 93 written li approved to correct itemi 3 b 4
TOLLIBDNiA C Carolina Power & Light Co BO/07/11 3ff
BO073O056I Ruponds to IE Bulletin BO-13 No crachinD Indlcetlons noted
tn Unit 1 cord *pray tpargir or in-veesel piping. Unit 2 inap
will be performed at next refueling outage
FURR.B J Carolina Power fc Light CD BO/07/13 lp
B00731O20& Submits supplemental roiponm to IE Dulletln 80-07 re BUR
jet pu»p» No indication* dittoverod elthir by visual or
ultrasonic tnsp.
FUBR.B J Carolina Power b Light Co BO/07/1S lp
BO073103Oi Respond* to IE Bulletin 79-03A. "Lonflitudiral Held Defects
in ASHE 8A-aia.Tup* 3O4 Stainle»t Steal Pipe " Piping specs
do not permit use of A-312, Tgpe 3OD sartB-i fusion melded
pipe in safety-related >\ji.
FURR.B J Carolina Power h Light Co 80/07/19. lp
R Periodic operating repnrti b related correspondence
SO0711O403 Forwards monthly operating rapt*, tor Jun> 19BO.
TDLLIBON.A C Carolina Powor h Light Co BO/07/03 Bpp
9O07OaoiBO Fm-uaril* LCR 00-037/O3L-O
TOLLIBHM.A C Carolina Power l< Llfllit Co
— BOO700010'3 LCR BO-037/O3L-0 on HUOS2H. dur Lng contalnmtnt In leflrl ti
checlirBqulreif negative pro st lire not r*at(i»d CaiJtfltl ln| lt«k«
in plpo 8. cable p«i» trat ions t, ctrnm lino bi>ot» Penntrat lam
ropaclied t boots replaced Tv&t prnrndurvs mvlsflit
TDLL1SDN-A C CarolImB Pouu-t- fc Light Co I1O/OA/37 2ft
8007130634 Forwards LED OO-OBII/OIJL-O
TDLLIBDN.A C Cai-Olina Power fc Lloht Cfl GO/07/11 lp
— B0071BO6&5 LEI( BO-OBa/03L-0 on HOOA07. dur ing normal reactor bldo
ilurlns mfusliny, Inner fc out»r dnoro of 30-ft air lac* PoiJiid
opin CausBd by turned coll .In tnnir door interlock iDUnoN
Coil r»plnc»d & air lock ncctta r»ttored
TOLLIBON, A C Carolina Powitr fc l-ijht Co OO/07/11 lp,
BOO7asogsi HO 1-BO-S9 tcnPlrjnu D007ia telcan r» ito-ti Cleat Ion b
incorrect use of total peaking factor for adjusting gain at
averafle pomer rango monitors Caused Ity iTieurnct T»f v»lu*.
Tech Spec vnluen ta lio changttd
TOLtlBOH.A C Carolina Pou»r l< LlgJit Co B0y07/l/, 3ff
B007B9082A ForM
TPLI.IBOW-A C
ril* LER HO-oab/03U~0
CiH-ollTia Power Ir Llglit Co
QD/07/&3
8007210033 LER BO-OEt/ODL-O on H00701 . ovtrage jiouer rtinjt monitor
4APRH) Q t> F detarmlnBd Inoperativit du* to lack ut el«v»n
low pouar range monitor (LPFIfl) inputs per monitor Caui»d bv
LPF1M connettori that Poeil into APDH bslng pulled louct
TOLL I BOH, rt C Carolina f'awe-r h Light Co $0/07/23 Upp
TDLLI60N.A C
rdB LEW QO-OS9/01T-0
Carolina Power * Light Co
eo/07/as
3007290031 LEU BO-039/01T-O on BQ07IO. iltll informtd tig OE that pr
camjiiitflr was not using corrvct fuel longth* ulian culcu 1 •ting
«JI total pnaklng factor Cnu«« net »t«tinl ProcmJurea
r-Bviaed to correct TPF r»P value
TOUL1EDN, rt C CsrtiHna Puuivr t. Light Co BO/07/»D If
— BOO7110406 Honthlu operating r«pt» for June 11BO.
MILLI8.E Carolina Pouer fc Liflht Co BO./O7/Q3 Spp
S Reportable occurrences, LER 8 (• related correspondence
ao07O1099fc Forward* updated LER BO-O41/O1T-1
TOLLISONiA C Carolina PouBr tc Light Co. SO/06 /20 lp
— B007O10364 Updated LER BO-0^1/01T-1 on BOOSH5, durinn review of •nvlrcn
a.ualiflcation of alBctrical aqulpfnenti nylon insulating
• leeve portiona of compre»slon-t«pe terifiln^tor lup* did not
pass qualification test, Caused bv sleeve d*t»rior*tlan
TOLLI80N.A C. Carolina Powir fc Light Co HO/ 06/20 2pp,
QO0701O901 Forwarde LER QO-032/03L-O
TOLLISDNiA C. Carolina Power I Light Co.
QO/0&/33. lp
— B007010309 LER BO-Q33/03U-0 on BOOSSS. iuh»n rod uai sileeted. rod block
Monitor B inoperable light an rod block monitor panel
illuminated. Ceuie unknown Problem could not be reproduced
or identified when troub lethoot ing syi.
TOLL 1 BON, A C Carolina Power fc Light Co BO/06/B3 lp
DOCKET 50-326 UN1V OF CALIFORNIA AT 1HVINC RGB «EACTOft
Q Inspaction raportt. IE Oulletinfc & carr«»nond*ni:«
BOO71B0366 Forwarda IE Circular BO- Hi "Radl oac tl ve Caiitnmlnat Ion »
Plant Denincrntlieif Udter 9yi t< Rsiultmnt Intern*!
Cont»minatlon nf J'trnonn*) " No wrlttan rtspontn r»miir«d
ENOELKEN.H H Region 3, Ran rrancltco. OfflK* of tho »i^eCtll^
IP,
R Periodic operating rnportt b rslattrt CDTr»«pi)rtd »nt t
B007inoA15 Farwords "Annual (!«pt fur Pirla-3 770701-OOOiaO "
MlLLEFli 0. E California, Unlv of, Irvln* 00/O7/00 lp
— 0007150630 "Annual Rent For Period 79070l-U006aO "
MILLER* 0 E California. Unlv of. Irvine, 00/07/00
DOCKET 50-327 BCaUOWl NUCLEAR PLANT. UNIT 1
A Apflicptlon/con^tr-uttlon ttnge document* t.
6«>7010313 Foru«ri» LER HO-033/03L-O
TOLLIBON.A C. Carolina Power d Light Co.
80/06/84. lp
—8007010031 LER BO-Q33/Q3L-0 on BOOSB6, uih I la performing pen»tr«nt t»«t
1 10, count r*te for sogrc* range monitors B ti C did not
d«cree«e uhan detectorn uen removed from cure. Cautt d b||
blown fuses * height discriminator ma lad justmBnt,
TOLLIBON, A, C. Carolina Power fc Light Co. 80/06/24. 2pp.
8007070334 Forwards LER BO-030/Q3L-0
TOLL1BON,A C. Carolina Power 1< Light Co.
8O/06/E7, lp,
80073S0460 Nnllflen that contract ppr addJ contrnetor nip p or I tu
provide operational eiperfance during low pouvr t*«t,p«r-
Pgel loading tc law pnu»r touting cBqulrement, ut 11 nut b»
ren*WBd,E»tstlng tontrset Urmlnnte* u/NRC concurrence.
MlLLa,L.M TennBi»i« Volley Authorllu 00/07/17 tp
« otiti** t-hst inUlal parformantp of Qpfcinl Ttit 7 en '
000716 denanstfattil tli*t power oporated relief valve tun ba
(•anunllu apprateri to provld* cool down cai>NlilllLu durlno
abneroial condltlnni * '
MILLB.L M T»nn«^»e« Vall^ij Authorltv 00/07/IB lp, [
NRC SaFuty Fvj] u*t i on Ife^oit (5EH), supple "• correspondence
DO73OOO!)3 FcTuarda gtstu3 rent on facility SEf inputs Inputs on S4
items .are ttill out s-tand ing ££Fl ui) 1 1 not tie ready in mo
for Lcimmi ss Ion B00728 briefing unless appro* input dato-s
STB improved
KENVDNiT Assist, mt Director for Licensing. 8O/07/1B IP
Security, ncdital, emergency I: fire protection pliins
0716O64D ropujorrts reviaed c o-mmi tnifnt for fire protection program
ru-eva luati on, Sec ti an A 3<bl.re lacking of fire protectinn
uatev Bye valves Revision ufl 5 made in response t-o IE Insp
Repts SQ-327/8O-1O t, SO-33B/BQ-OS,
WILLS,*, M Tpnncsseu Velley Authority BO/07/03 3p p
073JO4-?1? Faiuards Firu protect
request Uequests approval Scve
aftar Bimai
MILLS, L M Tennessee Valley Authority
mod B-chedule, por HRC B007OS
oils have coroplotlon dates
13pp
3733O575 Forurartfs rouised radiological emergency plan ui/c rosa-r »
Jetueen fllan. !, NUHEG-06D4 ft App Pi ITJ radi ol orjl Ca 1 emergency
•eepnnsc plan Ends available in Central files only
1ILLS. L M Tennessee Valley Authority (10/07/31 3pp
1728091-8 Advises that Us Stiugliause revieuod p ouieT-ascennon test
rocedures per Task Ac t i uti Plan 1 1 o- m 1 C 7 Review of
dlBcgcnty pi ncfilupea dncumentf'iJ hy HO042a ]tr to LS
ubens tain
ILL6.L M TfrDnessee Valley Authority 00/O7/33 Ip
730043-1 rtgpBq-ii as inter im step decided at NFIC BOO 72 3 meet ingp to
ipand near 5it& prpsi Facility to provide for command
introl Function for emergency reEponae Contra! emergency
espnnse ctr-per util 800721 1 tr , requires add] discussion
ru.B. L M Tennessee VallBy Authority 00/07/23 Ip
cort-BsponJence
'390375 Ark receipt n f p-etition Tenueating that HHC revofce limited
iwer DL Petition la being trffated under IOCFR3 3B6 t- action
II b B taken ulthir* re.isonahlp tine
HTONjJf R Qffirn a? Nuclear Roac tor ffcgula t (on^ Director
/Ofi/H-l Spp
072TO2B7 Notice of request for action under 10CFW2 306 bu, NfiC por
B0052B pstitnon to revoie low pncuer OL
DEMTDN.IF H OfFice of1 Nutledr Heattor RoauJatiori. Director
30/OiXSI Ip
J7E702T& Rpouesta NRC i-evokP limited OL of utl 1 to perform low
louar te-sting of facility because public health t< safety is
inddnacroil
)OT2L£:fli T The Nuclear Regulatory Commission 80/O3/20 3pp
0007310531 Responds to 800710 recast >-D particular aspects at
facility Applicant commi ttert to Bipartite installation of
d i str i iutcd ignition ays No practical need to hold up
issuance of OL pending completion of proposed sys
PLESBEr.M S ACR9 - Advisory Committee on Hosctor Qafefluard*
BO/07/ IS Ip
(3007290023 Forwards AhearnB 8OO713 Itr pe ACRB revieiu of application
for author! latlon to operate
SCHHENCEII.A Liconsina Branch S BO/07/17 3pp
P Operatlnir license stage documents & correspondence
BC30702O3aa Forwards NRC OtC of Nuclear fleactor RBgulotion Q0042H
reorgani latlon chart NecesEiiru period of transition made
la/min disruption to ongoing activities
TEIIESCO.D L ABHiotant Director for Licensing (30/06/13 Spp
BO070207-47 Forwards requests Por addl info rfl shleldinB revi«u l(
contalnmont sump Respon-sea should be submitted by B007O1
Includes suiranary of KliiBldln0 design revioul required by NflC
791109 Itr implamBnting Item S 1 A n of NUREO-0378
R, A Litunaing Branch H 00/06/19 JOpp
B 00703001 a Confirms 90062O oral author i ration to proceed ut/heatup b/
inoperable han-ger on prsasurtier line Deficiency Will be
corrected before initial cfititftlitij Formal amend to licnnao
mill be processed in near future
SCHWeHCEFf, ft Licensing Branch B' BO/06/23 Spp
0007030723 Forwards commitments TO steam flDnerator in»p ports & flow 1
iteam generator tubes NRC requires comfliitnient within 9 dayi
re performance of required actions described in oncl Insp
ports must be installed just above upper support plat*
Licensing Branch 2 SO/06/S3 3pp
QO07030195 Foruiarils request fur addl Info re Table 17 2-1 1
Structures. Bys d Cumpoiion t*, " for FBAR> which identifies
items subj to nperational OA program Info requested by
QOO&30
Licensing Branch S 80/Q6/Z4 3pp
H007010337 Fnriuards add! info re safety evaluation of faeility apodal
tout program, Provides addl assessment nf potential upset
conditions associated or/postulated rod withdrawal event*
Fuel clad failure i* not eipected
MILLS, L M Tennesnae Vnlleg Authority 80/0&/25 llpp
E30O7230001 For words statefnirnC of policy re requirements to bo met tor
turrent DL app 1 icationu, ft9 derived from MUREO-OA40 fc found
in NUHEG-0674
E1SENHUT, D 0 Division of Licensing HO/06/26 Zpp
e0070?0347 Requests that 300624 FR notice be roissuad to correct
implication that farm (TNflC) ouna facility t allegation that
plant is unable to withstand hydrogen burn pressure
BATES.A K Affiliation Unknown BO/07/01 3pp
ForiuardB Comml so 1 on HOQ337 rnemDrandum & order innta
t si on 5 on UC3 7flOS02 petition for reconsideration of
">13 (nemoranUum ft o-rdeT UC£! 771101 petition soufljit action
fire protec ti (in for electrical cables
ENHUT. a B Division of LietnBing 6O/Ob/H5 C9pp
ility Final Safety Analyaia fie-porl (FSAF!) & amcndi
DO 374 An-ffnd to UL flpfl icati pnj cons i s ting of Amend id to
lalng Chapters 2,3,5,6 t, 1 *i FEAR doc umentatiory df item»
TimittiHl bu LM Mills BOO (i 1 3 1 tT b responses to NF1C
Btions oncl
^S, J L TpnneBsee Wai leu Autfiority 80/07/35 Ip
300376 Amend &6 to FSAfli reviaing Chapta>-s 3,3.5.4 ft IB
Tetinpssee Valley Authariti, 80/07/28 13pp
B00717049t FormardB Amend 3 to License DPR-77, tafety evaluation fc
notice of issuance t availability
SCHWENCER, A Licensing Branch S BO/07/O1. Sfp
— aoo717O303 Amend 3 to License BPR-77 clianging pages to App A Tech Sped
re surveillance requirements for taking radioactive liquid &
gaseous samples
SCHWENCER.A Licensing Branch a 80/O7/01 83pp
— S007170SOB aaPetij evaluation supporting Amend 3 to License DPR-77
* Office of Nuclear Reactor Regulation! Director BO/07/01 Bpp
— BQ071703I7 Notice oP issuance Ir availability of Amend 3 to License
DPR -77
SCHHENCER. A. Licensing Branch 2 80/O7/01. 2pp
ommittee nn Reactor BaPeguards reports ft corr«Bpondent:e
ec of ACHS Subcommi ttao on Sequeyah Nuclear Plant BOO709
shin^toniDC to review QL request
Fficir of the Secretary nf tdc CommiBiian SO/D6/1S
SOO7180061 Foriuarde safptg evaluation supporting Amend S to Liceniit
WPn-77
Licensing Branch S BO/07/01 Bpp
— SOO71B007O Safety evaluation supppor-tlng Amtnd S to Licence DPR-77
•» Licensing Branch 3 80/Q7/01 Spp
u»5*s review conducted at 243rd ACRS mcBtlng, on B007IO-
[.lltation to operate at full pouer Facilities
eii at levels up to full power u)/o undue risk
i ned are eon^lderDd
ACRS - Advisory Committee on Reacter Baf^guarils
BOQ7JBOB93 Forwards Amend 2 to License DPR-77, safety evaluation
notice of issuance & availability
3CHUENCEH.A LiCEnaino Branch S SO/07/01. 2pp,
-8007180976 Amond ? to License DJ'R-77, changing Page 0-1 to App A Tech
GpBcn tu permit nntry into Modes 3 5. 4 iii/unrosolved piping
support or restraint deficiencies
SCHWENCER.A Licenning Craned 2 SO/O7/Q1 flpp
-H0071BQBVB Safety evaluation supporting Amend a to LicuneP DPF1-77
* Office of Nuclear Reactor negulationi Director (30/07/01 app
— SO07I604B4 Operational Qf\ manual. Part 3. Sec ti on3. re matl & apart? part:
ft Tennessee Valley Authmitg 70/OU/3? 33pp
SD072eQOOd> Notification of BOQ727 mooting w/utils in Uotheada; WB to
disruss mattflfs re- TM1-2 dated requirements
DftnMERICK, A M Licemiing Branch 1 KEfill IQAhJ, J D , STABLE, C H
Litenslng Branch 2 ao/07/lfa fapji
— HOQ71H0399 Notim of issuance & availability op Amend 3 to Litefi-Se
DPH-77
BCHHENCEfl, A L icons ing Branch 2 BO/Q7/O1 3p p
80071SQ472 Forwards response to NUREG-O57H, TM1-2 Lessons Lnavnnd Task
Foreo status ropt ti short-term rec ommondntionB Con sol idotoo
previous Itrn Includes mvioions to containment isolation !•
ohinlillny items
MILI.S.L M Tennessee Vallifu Authority 8O/07/03 Ip
CO072D0001 "TVA Respond to MURCO-O37B. Shorc-Term Lessons Learned
Requirements "
« Tennessee Valley Authority Qo/07/03 300pp
0007190640 AdviaeH that roaponsu to f-'HAR, Question 3 70, uii 1 1 not be
organ i* ad & prepared for oubmittal until BOOGQ1
HILLS.L M TonnssaeB Valleij Authority fJO/07/OB ip
B0071S0692 BuBmltB recoinmundoti ons re facility steam generators, in
raiponne to NRC 8QQh33 Iti Camera devicu uill be Jeaigned b
taittd for remoto inep of tube tuoports In lieu of addl
part* Mat artivo tube surface margin uill bo maintains)
HH.LS,L H TonnosaHe Vollag Authority GO/07/OQ 2pp
C007 130921 Forwards info ro Category 1 masonry uollsi in rBnponsB to NFIC
f)0012I Itr Results of InvBB tlgati on op inplace attachmenta
to raaionlry ualls uill bo submitted by BD1017 OverEtro enclo
available In Central Filat (31 pp)
MILLS, L H TunnonBOB Vallog Autharitg HO/07/O9 4pp
—8007180532 "Oosion Criteria for llulnfarced Concretu uloelt Halla "
8TDNr,F A . CANNON, R W , LACV, T P Tdrineanoe Val loy Authority
72/01/07 29pp
aOD7210filB Notification of 800714 mHetino u/utll in Dethesdai HD to
diecun* emoratncij DporatltiQ inntruc tlonB
HTAHi-E, C R Llcansing Branch H SO/07/1O 2pp
9007340397 Foruardn Amend 4 to Liconee DPR-V/i anfotg evaluation t<
notice nf IsBuancB ti avallaliill ty
DENTON.H R Offlen of Nuclflar Dnnctor Regulation, Director
Bo/or/io app
BD073SO532 Advitos that util pi-(i|ioe.DS in^tallntion & implemanta t ion of
interim sys of distributed ignitors uhieh uould limit
nffacts of large amounts of ligdrngon Safetij analysis,
ifraiuings t, FBAU rcvisiana uill be submitted bg 90031^
MILLS, L M TonnBS5.ee Vailey AothnriLy 00/07/17 5pp
B00723O467 Formal ds rebpnr.se to NRC BOObO7 Teo,uBBt for cnmnii tmon t to
moot requirements t, pisociato-d sthednles in Five- specific
TMI items Includes aliift mnnrung . 1 1 Liinsi nfl BJBIHI nat i ons &
licensed d i sBeminat i nn af opurdting piperlencc
MILLS, L If Tenne«6eo Vallcij Authority BO-/07/1B 4pp
B00733O477 Foriuards response to NDC B006I9 request for flddl info re
shielding design revleuijhlnh rnnge containment radiation
monitor A icte-se cnntiol of art/as adjacent to spent ftiel
transfer tubes
MILLS. L M TenneHSue Valley Authority QO/O7/1O Bff
QOO723Q4BO FcTuardE 'EC DP AC Solidification Sg* Process Control
Program-" Revision 4. in response to NRC 000334 request
MILLS, L M Tennessee Valley Authority BQ/07/1B Ip
"HOU-7S304B1 "ECQI'AC So 1 idi Pi cat! nn SIJE Process Control Program,"
Rowiaion 4
« Tnnneesoe Valletj Authnrltij BO/07/1H ?0pp
— 0007330493 "Technical Hept un Ui-ea Fortna 1 deny dc hl Marhotf-up Amcfco ropt
on procedure FUT orisite sol i d i Pi cation of lou level rsiiuiaste
at faci Hty one 1
* Anefco, 1 nc BO/O7/ia 4Spp
6(107230533 FarwardB response to H Mendoncci 800627 questionB re reactor
vessel head ventinff SIJE Weatinghouso ii developing
pracedures ttn inaifequatB cnre coaling tor recommended UBB
of vsnt sga Oij utilg
IIILLB.L M Tenncsaep Valley Authority BO/07/1S Hop
80Q7J00093 ForuarJe statuK rept on facility SER inputs Inputs, on 24
items aro still outstanding SER uill not be rendij in tine
for- Commission BOO72O brieFiug unless approir input dates
aro improved
KENVON, T AHSiatnnt Director for Licensing 00/07/13 Ip
— -8007240302 Amend 4 to License CPR-7V, modifying Tech SJppcs for lain pounr
. H R Office of Nuclear Reactor fl«gulat ion^ DirectDr
80/07/10 4pp
— BO07Z4O30/I BflCwtu evnluation oupportino Amend 4 to Liconsu DPR-77
fl Office of Nuctiar Honctor Begulatinnj Dirot tor BO/O7/1O
39pp
000/S3040B Foruarifs addl InFo per NRC 900dl9 request re control of
containment sump debris
MILLSjL M Tennessee Valley Authority 00/07/31 14pp
0007270724 roruar{l& description of program, "Truining for Mitigating
Core Damage " Program was developed to ensure that all
licenced operating ettip 1 nyen are properly traLned to use
available info should accident occur involving core ifamaga
I11I.LS.L M ToniKfSBBD Unlley Authority BO/ 07/23 Bpp
— B007240312 Notice of issuance !> availability of Amond 1 to License
DPH-77
BCHWENCER.A LicHnnino Branch 2 00/07/10 2pp-
B007tS0371 For ward e Rovlnion 3 to util reflponsH ID Horn S 1 in, NUREO-
0970 Revision incorporate* loot testing procedures For
woite gas mjo (App E> & results of lualr reduction program
for liquid ti gns ayn (App F)
HILLfl-L H, Toniiaoseo Valley Authority 130/07/11 6p|*
— Q00713007B Survoillanco Instruction SI-65d, RovlBion 1. "WMBte Oaa Sya
Qrou» Leakage Teat "
KUEHN,L B TennotSB" Valley Authority 60/06/12 14pp
— B0071509aa Liquid sy» loah test rfata
CHURCH, J H ItinneSBflC Valley Authority
HO/07/Oi 9pp
BO 0720 Oft 23 Ailvisua NRC of «valuotion at potential hoiards in vicinity
of pliant (i op main control i-oeim habitablllty «,ys for
protection Prorn radioactive & to"1t g<is releasea Plant
operators are jdeniiately protoctod from possible haiar-da
MILLS, L M Tffnreaste valley Authority BO/07/34 Ip
B007H9O631 Forwards evaluation oP demon ft equipment delivery iclmdu-lao
for mods In response to Wl/REO-0694 All eq.i)ipment far uork
requiring power outnoe will bo available Mar-June First
refueling outage at hed ulod for eorlg 1932
PAffRlB.H B TnnnB-BBeo Valley Authority Boy07/a5 App
8007S90679 Foruarils preliminary assessment of potential for bargi? tou
heading upstream impacting neui essential rau cooling mater
pumping statio-n Silation not required for feafe oporatinn of
Unit 1
MILLS, L M Tennessee vallcu Authority H0/07/2a 2pp
S0071A0471 Reaponda to J Spraul informal nueutions re FSAfl Tablo 17 K-l
* forwards operational OA manunliApp A. re critical ay* *
Pert 3, Section 2. re matl b spare parts
MILL8, L M TennilBBOfl Valley Authority BO/07/11 9pp.
— B00716047B Operational QA mapuol,App A. r» critical a tructures, syi ft
components list
OREENiH, J TennetBoe Valley Authority 70/00/13 5Opp,
B00729O797 ForutordB data d drawingG re settlomcnt monitoring Revised
Que>tions GNP 03 B4 & GNP O2 73 will be incorp orated into
TSAR in ncit amend No signiftcant settlement obneTvnd
Drauings available In Central Files only
MILLS, L M Tennessee Valley Authoritu BO/07/2S ISpp
0007310396 Advises that shnrt-tarm itemB !i tiuo long-term items listed
in NUREO-0011 re main conkrol room des-ign review have been
corrected Utll comml ttod to investigate feasibility of
eorrecling reradininj items of first refuel i nfl outage
HILLS. L M, Tennessee Valley Authority SO/O7/SO 4|ip
31O4IS Fnruarils revised tuenmary page for 00Q6J& response to
IREO-OEOa
LL3, U N Tennessee Valleg Authority BO/O7/3B 2pp
31O3S3 Forwards "Unit 1 Special Startup Test Kept "
LLS.L H TE-nnaBSPP Valley Authority SO/07/3') If
'D731Q3H& "Unit 1 Special Startup Test Rept "
MACH, S R Tennessee Valley Authority GO/O7/29
3pp
80O716Q307 Forwards IE Info Notice BO-37. "Degradation °* Reactor
Coolant Pump Studs " No specific action or reipon"
raquirr*
O'REILLY. J P Region 2. Atlanta. Office of the Director BO/OA/I1
IP
9007030740 Forwards response to IE Bulletin BO-06. "Engineered flafBtU
Feature (ESF) Re"t Controls " List at tut etu-rolatad
equipment which will not ve»aln »n ameriiencv node aft»r
reiBt D* actuation signal* end
L Tenn»«BB Valleg Authority BO/06/ 12 3pp
310411 Submits test results of plant au.iliary bids Ban treatment
per requirements of SER.Suppl 1 Negative pressure equal
or more negative than minus 1/4-inch uater gauge
lative to outside atmosphere uas achievc-il In pump rooms
LLHiU M Tennessee Valley Autftoritu BO/O7/39 Ip
0007020347 Formal-ill rtsponst to IE Bulletin 60-04, "Analysis of PWt
Main 8t«a« Line Break w/Contlnuad Feedwater Addition " LintB
relevant assumption* u»od in *11 core tranilant an«I««»«
Assumption* furth»r explained in FBAR
MILLS, L M Tennessee Vallou. Authority 80/OA/1A 3pp
Forwards addl Inf-o on temp control for main st(.nm valve
oms, per O Parr reques-t
LLS.L M Tennessee Valley Authority 60/07/29 3pp
HBpectian reports. IE Bulletins l< correspondence
8007020761 Forward* IE Bulletin BO-IB, "Pos»iblB Lo»» of E«»BT-(Bneu
Notification Bu* (EN9) H/Lon» of Qff»ite Power " Written
rftiponie requlrrd
D'REILLYjJ P Reoion 2, Atlanta, Office of the Director 80/04/18
lp
340089 Forward! IE Info Notice BO-2Q. "LOBS nf Decay Heat Ramovul
lability at Davii-Bcsse Unit 1 Mile in flePuel ing Mode "
response required
FIE ILL V, J P Region 2, Atlanta, Office of the Director BO/05/OB
BO 0702039 I Foruardi IE Circular BO-I3. "Lost of Reactor Coolant Puap
Cooling * Natural Circulation CQnldoun " No written r.tponit
required
O'REILLYfJ P Region 2. Atlanta. Office of tti» Dlractor. 80/O6/M.
IP
[>aO!93 Foruards IE Info Notice 00-22^ "Breakdoiu-ns In Contamination
ntrol Proorains " No written response required
1EIL.LY, J P Reoion 3. Atlanta. Ufflce of the Director HO/05/2B
0007310344 Forwards IE Insp R«pt'» SO-SS9/BO-a9. 30-340/80-19,
aQ-2<?6/80-BO i. 30-327/BO-33
D'REILLV.d P Reoion 2, Atlanta. Offict Of th« Director M/Oi/M
3PP
00127 For ward I IE Inaj Rept 30-327/80-10 on 300512-13 No
icnmpliance noted
iPHV.C E Rojlon 3. Atlanta, Reactor Construction * Enoineerino
ipart Branch 30/OS/SB Spp
J7100131 IE Imp Rept 50-327/30-18 on 800912-13 No noneomp Hani 0
10 tad Major areas inspected seismic analysis- for aa-bullt
lafety-rnlated piping oija per IE Bulletin 79-14
<ERDTrA t! Region 3. Atlanta, Reactor Con* true ti on & Engineering
upport Branch rIODENOS, L Region 3, Atlanta. Office of the
(rector SO/05/E7 3jip
'104HB Forwards IE Circular EHJ-13, "Grid Strap Damage in
tinghotJEfr Fuel /Viisombl i«s " No written rBBjinnae required,
'EILLY.J P Resion H. Atlanta, Office of the Director BO/Q5/2B
10223 Forward? IE Info Notice BO-23, "Loss of Suction to Emergency
duater Pumps " Mo written response required
EILLY, J P Region 2. Atlanta, Office Dp the Director 80/05/29
70219 Forwards IE Insp Rept 50-327/BO-16 on eOOflOB-SO & notice of
lation
IS. R C Region Si Atlanta- Reactor Operations Nu clear Support
nch BO/06/02 Spp
7170SH1 Notice of violation from insp on 9004QB-3Q
Region 2- Atlanta. Office of the Director BO/Oh/OS
7170334 IE Iti«p flfpt SO-327/BO-I6 on B0040B-ao Noun ompl ianc" noted
allure to maintain vital area barrier intearittf
QTTLE.M T Region 3, Atlanta. Office of the Director DANCE, H C
Region 2, Atlanta. Reactor Operations Nuclear Support Branch
D/0&./02 ISop
30005 Foruiarii* IE Inup Repts 30-337/60-19 fa 30-328/80-12 on
'13-16 Ha noncomp 1 ianc e noted
13, R c Region 3. Atlanta. Reactor Operation* Nuclear Support
ich 90/OS./O5 Spp
— 8007310391 IE Imp R»pt* 30-239/80-23. 90-K60/BO-19'
50-327 /BQ-3S on 800521. Imp cemilctod of snfore»»*nt Matting
in Atlanta. OA to dlscuvi exceeding DOT radiation Haiti
during shipment of radwaitB fron Brouns F«rr«
DANCE. H C Rag ion 3, Atlanta, Reactor Operation* Nuclear Support
Branch 90/06/30 3pp
BOO71 10034 Ack receipt of SCO 323 itr in for* inn NRC of »tapi taken to
correct violation noted in IE Incp Repts M-3S7/BO-M t
ao-aae/ao-oB
MURPHY.C E Region 2. Atlanta, Reactor Construction l< Engjm«»rlng
Support Branch 80/Ofi/H4 Ip
— B007110039 Submit* «ddl rasponit to NRC 6003O1 Itr re viol»tl«n no tod
In IE Insp Repti 30-327VBO-14 t< 30-330/80-06. Corr»etiv«
actionE all Section 3 surveillance initrucfcloni coaply w/
Bectipn 11 of ASHE boiler code
MILLS, L M Tennessee V«ll»« Authority 80/04V09 lp
BOD7170070 Foruard* IE Circular SO-14. "Radloactlv* Contamination of
Plant D«nineraliied Mater BU* •< Reiultant Internal
Contanlnation of Personnel." No written revponee required
O'REILLY, J P Region 2. Atlanta, Office of tha Director, BO/M/34
BOO7020627 Adviiei NRC that followup r»pt to B0061H reipon** to IE
tnap Rept 90-327/BO-1S. containing one infraction! will be
cubnittad bu BOOiSO
MILLS.L M TennasiBe ValUg Auttioritu BO/ 06/24 lp
BOO70Q0330 Forward* rept on imp prpgram re *u> perforiMncB Which KMB
initiated in r»»pon«» to IE Insp Rapt 90-337/80-19 Intp
proflram ihould ensure tyi pfrforkianca will not ba degraded.
HILLS, L H Tenn«iBB< Valley Authority 80/04/B7 ISpp
BO0733D393 Forward* IE Bulletin B0-lf» "Putenttal MUappllcatlon of
Rosenount Inc Modal! 1131 1 1102 Pr»i«ur» Traninltttr*
H/Eithur A or D Output Codas " Written retpon«B renuir*d.
IE Circular flO-16 al*o and No written reipamt raaul^ed
O'REILLY. JP, RBQlon S, Atlanta Office of th» Director. BO/06/S7,
lp
IE Insp Repts 50-327 /BO-19 ft 5D~3BB/80-12 or B00613-li Mo
in-c pmp 1 1 ance noted Major areas inspect a-d preopevational
>stin|), program review fc implenintation t< foltouiufi of
•eviously tdentifieit items
3HENDEN.M C . BUTLER, S & Weoior H. Atlanta. DfficB of the
irector UPfllSHIjCH Region 2. Atlanta, fteac tor Operat ioni
Jtlsar Support Branch BO/Ofr/01 4pp
J0029 Forward i IE Info Notice BO -26. "Evaluation of Contractor
'rograms " No urltten rpaponse required
ILLYrvJ p Region S. Atlanta, Office op the Director. BO/06/10
80O70B0331 Forward • ratponi* to Deviation ItBM SO-327/BO-17-01. noted in
IE In«p Rapti 30-387/80-17 b 30-386/80-10 rt InadB^uatB fire
barriers, R*o.ujred Insulation Installed on ttven eonduiti> Ic
cover plates reinstalled on three conduit fluting*
HILLB, U M- TBnn«*SBe V»ll«« Authorltv BO/06/30. 3pp.
BQO72 10036 Foruardi retponie to IE Bulletin BO-OS're--a<B«lnatlon of
containment lln«n penetration weld* Penttratlon* at
Baqua^ah. Watta Par fc Bellefonte contain flued h*ad dtiim
Dailgn far Vsllqw Crvah not vat coMplBtad.
M1LL8.L M TannBiiBB valliy Authoritg. BO/07/08 3pp.
900731039*. Responds to IE Bulletin BO-10 re contamination of
nonradloactive sys Routine sampling t analyils program
••tabliihad Hill comply Li/requirements should Identified »y
bacone contaainated
MIULHiL M Tennessee Volley Authority BO/07/QB ip
— BOO7010502 LER 80-O53/03L~Q -an BCOSSft. sVC blag VHnt monitor
0-RM-9Q-132D declared inoperable due to lo»B of flflui Caused
by inoperative radiation monitor sample vacuum pump Other
monitor -sample pump valveii In t monitor returned to avc
HEREFORD, J M Tennessee Valley Authority flO/Ofi/25 Ip
B00731009& Forwards response to IE Bulletin 79-B7 re loss of nanclass
IE ir>stru»iiintation ti control power sys bus during o jurat Ion
No deficiencies discovered
MILLS, L M Tennessee Vall«u Authority BO/07/13 3pp
BOQ739O479 Forwards rgsponte to NRC BOO626 Itr re violations noted in
IE Imp Kept 30-327 /aO-20 Response withheld
(ref 10CFR2 7901
MILLS, L M Tennessee Valley Authority 00/07/31 Ip
a0079fl04?Q Forward* addl response to IE Bulletin 80-06, "Engineered
Safety Feature (EBP) Reset Controls " Pr*i*nt control
scheaes adequate EquipiMTit evaluation *ncl
M1LLS.L M Tennesiee Valley Authority BO/07/24 spp
R. Periodic operating reports fc related correspondence
800722O39B Forwards monthly operating rept for June 1990,
HALLENTINE, J M Tennesiee Valley Authority BO/07/14 Ip
— B0072203&0 Monthly operating nipt for June 19BO
WALKER, F M Tennessee Valley Authority 80/07/02 9pp.
B. Reportable occurrences, LERs (. related corretponience
9007O10S5S Fo
CALHDUM, J R
arilB LER 80-07e/O3L-0
Tenneiaei- Valley flutd
IP
— H007010332 LER aO-070/03L-O on B0032ft. during MDdo 4 opora 1 1 On,
concentration in F1HBT moa'Sufeil 3134 ppm Caused by boron
concentration makeup facing bun high Boron diluted to proper
RECOHD. D J
Us 1 1 ay Authprltg BO/Ob/EM Sff
0007010934 Forwards LEU HO-QBI/O3L-O
CALHOUM, J R Tennessee Valley Authority HO/OA/2B
— BOO7010S41 LEfl BO-OB1/03L-0 on 300337. during timing at 1
containment sump to train D of containment spray. for
•urveill ancc test 166 i, valve uoultl nob open Caused by
switch controlling FCV-73-30 b«ing out of adjustment
ROMINE.D Tonno*»ee Valley Authority HO/0&/33 1F
-FCV-7K-BO,
B007010490 Forward a LER BO-OB3/03L-O
CftLHOUN, J n Tennessee Valley Autliarlty
Ip,
~- B00701O515 LEH BO-OB3/03L-0' on 800329, |mmp motor on a-RM-fQM
out causing common circuit breaker on O-RM-VO-lai/ 1 41 ti
l-RM-90-112 to trip Cause unlnouin Motor rffplacBd
F TenrfSBBB Valley Authority BO/Oi/SA Spp
0007010067 FNB-lI-aO-007 on 8O0304, util employee gained unautliorlieil
•ntry to protectnd area tc further accesi to reactor bldg
Euploy** pbierved phutagraphing fueling opiratian Search of
•rent ehtvred revealed no contraband Employee apprehended
TOBIHiM J. , DANCE, H,C Rngion 2, Atlanta, OfHc* oF the Director
BO/03/09, Bpp
BOO4240BM PNO-1 1-00-39. two iB*ue» currently under rvvteu by TVA which
MV r»*ult In delay in startup of unit, First issue tovers
replacing of split poiltlanlng pins u*ed in mounting control
rod guide tube* In upper core Hup port miembly
HABTIN.M. , DAUCE-H Region 2, Atlanta, Office of the Director,
80/03/12, Ip
Bt)070103ia Forwards LGR BD-OBQ/03L-0
CALHOUN.J H TentlDB»B« Valley Auth
00/OA/H& ip
— -BOO7010533 LER SO-OHO/O3L-0, on BOQ5H7, durl n0 test on D train of
auiillaru bldg gai troatnicnL «y a, mntral PUBD failed b
tripped Pnn motoi- EUpplu br eater Causa unknnun Fuse replacad
St sifa declared operable
RDHINE.D To-nneBBoe Valloif Authority 1TO/06/S& Ip
0007090283 Forwards LER BO-OIO/OIT-O
CAL-HOUN, J- H TnnneS36!* Vnl 1 pu, Auth
Ip
8007010383 Foruardi LER BO-073/03L-0
CAUHOUN. J. R Tennirittea Valley Authority
00/06/23 Ip
— BO07O103B9 LER BO-073/03L-0- on B00520, dur Ing nupport h h^ng^er imp,
dl*crenancle» dl*cov»r»d between ai-bullt d «i-an*lgi*d
configurations that could c«u»* Pailuro in piping during
aaiinlc event Deviations ulll be modified as required.
BWEARINOEN, J, D T«nn»»«e« Valley Authority BO/06/23 Opp
B007010«3 Forw«rd» LER 00-OW/03U-0
CALHQUN.J R Tennenee Valley
BO/06/S3 ip,
~eo0701043B LER BO-063/O3L-0, on B00430. four PJre barrier penetration«
rflicovered to bi breeched U*ding from reactor btdg to
energency gas filter treatment »«* filter -room, Cauted by
const error.
e Tannan*ee Valley Authority aa/Oi/&x z?r
BOO7O10SaB Forward* LER QO-OB2/03L-0,
CALHOUN, J. R Tennessee Valley Authority.
BO/Q6/E3, Ip
—B007010339 LER BO-OB2/03I.-0 on BOOS26- u/wnit in Mode 4. prtasuriier
heatup rate exceeded ma* allowable rat* Cavsed by so-fety-
injector creating insurge into preaiurt ier, Level reitored
during recovery phase l> temp restored to limits
ROBINSON, F Tennessee Valliy Authority 80/06/33 Spp
BO07010417 Foruardn LER BO-07i/03L,-0
CALHOUN, J. R Tnnt.Bi.ee Valley Authority.
to
—8007010419 LEU BO-076/03U-0- on. BOOfiSAi dui-lng normnl operation, output
circuit breaker on vital Inverter B-I tripped* causing iao
volt ae vital instrument power boardi B-I to become
Inoperable. Cauied by thermostat being out of calibr.
RDNINEiD.R, Tennes»«B Valley Authority ao/Oi/as Ip.
B0070104W Forwards L,ER BO-OB3/03LrO,
CALHDUN.J R Tvnne**«e Vail eg Authority.
00/06/85. tp.
— BOO70BOaB9 LER BQ-040/01T-0 on HlJ0331.upon prooperati nnnl tasting 0
safety injection pump s. found that A.9QQ-VQ11 breakers would
lockout* preventing pump start COUGH) unknown Problem is being
evaluated
ROhTNF, D Tonneaaeo Valley Authority BO/Od/H7 Ip
0007080334 Poruiard* LER BO-OB&/01T-0
CALHOUN.J R TenneSBee Vsl l BIJ Authority 8O/0&/H7 Ip
— B0070B0341 LEU BO-OB6/G1T-0 an 000613. m/uni t in Noil* 1, centMf ugal
ehorginp pumps could Pail due to Insufficient Plow delivery
during postulat-ed secondary side high otiorgy line ruplure
w/coint ident Pailgpu of pnuer operated ro-tlef valve
LOBEK.M J Tannossee Vnlley Authority flO/0(,/B7 Spp
BO07I1037S Foruiftrds LER BO-OH7/03I--0
R Tennessee Vnlley Authority BO/Ofii/^7 ip
— B007110376 LER BO-087/031,-0 on B00603, uih J 1 g in Mude 3 after inadver
BI,dte»ffl generatars inauiil not shut down normal I «j All
lockout relays damaged during shutdown attnm.pt Cei>«ed by
relay plunger malfunction Relay collo replaced j
CURTIS, J W Tennestee Valley Autnorily BO/06/B/ Spp
B0070BOaai Foruiards LER BO-08S/01T-0
CALHQUNjJ R Tenne»SBa V«U»g Aufchority
Iji,
--8007030391 LER BO-OBB/O1T-0, on 900B30, during review of EOTS & ABOT8
equiprnent quail ficationii ny« tolnnold valve* foiiniC rated far
77 F normal BVC temp Ambiunl temp may rsach 101 F CausB not
•tatej, NBU valves baing purchased
RDMINE, D TonnBnee Valley Authority 80/06/^0 Ip
60070804 OO Foruerdi Special Jiept 80-01
CALHOUN.J R Tennos^fo Valley Authority
BO/ 07/0 1
— H0070B0402 Special Rept BO-OI on B00605, fires ton. penetration MK1H1
luppqrt cloarancH reportoiJ oxeeB'Sive during pipins '•
configuration Imp aeven-day tim* rsquirement vxteadad prior i
to penetration remnaauremtml t< closing an BOOfiOi [
* Tennessee Volleij Authority 60/07/01 Ip
•7O90H49 Forwards revise* Para!
ates
I1LLS.L M Tennessee Valley Authority
> oncy rept re spent fuel pool
BQ/07/O2 Jp
:0 070903 SB flevtsed Final &et ic i enty rept re spent fuel pool gates
Gates are Hot designed to Seismic Category 1 requirements
per Reg Guide I 13 OA aspects of jato integrity mil] be
verified for all throe plants
* Tennessee Valley Authority BO/O7/03 2pp
•7150439 Foruwds LER BO~O93/(HT-O
ALHOUN. J R Tennessee Valley Authority
007350466 LEH 8Q-093/01T-O on HOOAaS.vent duct in temporary air lock
discovered breaching au > bldg integrity Caused by
unauthoru eS installation of duct by const workers Duct
removed, ho 1 B patchad & sealed
HILBDURN'G R Tennessee Valley Awtlmritu BO/07/07 Spf
713OS04 Forwards LER BO-QQ4/QiT-Q
ALHQUT), J F1 Tennessee Valley Authority
007150512 LER BO-OB4/OJT-Q on 8OOi23, control roam integrity vat,
breached ti y removal of donr C-41? for maint & removal of tape
Prom C-37 ic C-50 for OCCBEB Doors repaired or replaced
Personnel re ins trucked
SULLIVAN. JH Tennessee Valley Authority 80/07/O7 2pp
713047O Forwards LER 80-073/0 1 T-Q
ALHOUN.J R Tonnosiee Valley Authority
007150489 LER BQ-QiafQlJ-Q on BOOfcEA. BR 481il.aBcBR4BllEa4
ware performed ui/o sub a e q.uen t B-hour surveillance
requirement being met Cau-sed by personnel error due to shift
•change Shift & relief turnover proteduro being ch-anand
RECORD, 0 J Tennessee Vail oy Authority SO/O7/OB Ip
7130990 Forwards updated 1ER BO-041/03L-1
(VLHOUN.J ft Tennessee Valley Authority BO/Q-7/Q9. Ip.
3O71S0585 Updated LER BO~041/oaL-l on 80043O, 1 -FCV-3H-110 I ID la tod on
nonessentlal air pressure, caus ing six valves providing flow
to containment upper & 3 auier compartment radiation monitors
to close Cause unknown
MCORIFF.J M Tennessee Vfllley Authority BO/O7/09 2pp
7130491 Forwards LER 80-09O/03L-0
M.HOUHfJ R TennrssBB valle« AufchDl-iti)
DO719OSD1 LER HO-O90/03L-0 t>n aQOhlS* disci-epanc y discovered betwean
a-i-bullt ti as-snalyind support ti hanpar configurations Full
r*pt mill be prnvided bo flRC bvfor-n initial criticalitg
Doviatia-ns- which could cause pipe Failure uill be modified
BHEARINOEM.J D Tennessee Valley Authority BO/07/1O 3pp
M60519 Forwards LER fl 0-0<?7 / 03L-O
U.HDUN, J R Innnasse" Valley Authority
1071A0333 LER 80~O97^03L-0 on BOO ft I fi, cool Ins tower bloudoun line
effluent mnnitor (O-FR-27-179) declarait Inoperable Flow
monitor recardrr (nrilcatei) incorrect Clou Ftouj element
recalfbr tc design change in progreis
BMlTHSONj J D Tenness-ee Valleu Authority SO/O7/H Ip
?2104ii Foryerds LER 80-O75/03L-Q
^LHQUN, J R TennesBBf Valley Autharity
BOV07/11. Ip
J07S10475 LER BO-093/03L-0 on BQOfil4> aux 11 1 flry vent radiation monitor
declared Inoperable due to spurious high red *p 1 fees. Caused
by defectivR microsui tch.u/fflonitor inadvertently left in
continuous advance mode
HEREFDRD.JM Tennessee Valley Authority 80/07X11 Ip
'BS0469 Foruiardt LER BO-DB9/03L-0
HLHDlfM.J K, TEnnease* Voll»y Authority
107220471 LER 80-OB9/03L-O on 800i>09, contrae t review Ttvaalid local
control station ialectar ciDitchei (C-H type IDE SOT 3 ut.fi In
Class IE <li-clHti lack environ quail f I cati on for operation
following high energy line braalt
ROM I HE, D Tennntsee Vatlei) Authorily BO/O7/14 Bpp
'2B013fc Forwards Special Rept BO-U3 re positive modorate tenp
leffiejent measured during low power phifoics testing at
1 control rode out of configuration
R Tennessee Valley Authority 80/07/15 Ip
— BO072304'P7 Special Root BO-OS on H00706i moderator tenp coe^ficiont
measured less positive than limit established in Tech Bpeca
during loiii pouer physics testing Control rod withdrawal
limit datermi ned as shown in encl graph
* Tennessee Valley Authority BO/O7/13 Bpp
SOO7S90i!j33 RO BO-H on 8OD706. during lou power physio testing at all-
control rods out configurati on. moderator bemp coefflclont
Found out of sp-Bc Control rod withdrawal limit* determined
* Tennessee Valley Authority HO/07/15 3pp
B0072EQ56B Fnruarils LER BO-09Q/03L-0
CALHOUN.J R Tennessee Valley Authority
— BO07230574 LEH 80-0-98 /O3L-0 on BOOA24. during ho«t-up, tee fitting on
pressuriier pressure sensing line for instrument l-PI-68-323
failed, allowing primary coolant to leak Into containment
Caused by improper installation of ferrule ring on tee
EMRnTH.R M Tennen«e« Valley Authority BO/07/1B Ip
BOO72S0418 Forward* LER BO-OB1/03L-0
CALHOUM.J R Tennessee Valley Authority
8007290646 Forwards LEW 80-OB7/03L-0
CALHOUM.J fl Tennessee Valley Authority
— B00729Q657 LEfi flO-OB7/03L-0 on 800402. while in Mode 8 after inadvertent
Blidlesel generators would not shut doun normally after
starting While attempting restart, lock out relayc damaged
Cause not stated Relays replaced
CURTIS, J M Tennessee Valley Authority BO/0&/S7 2pp
8007270790 Forwards LER 80-10a/03L-0
CALHQUNiJ R Tennessee Valley Authority 80/07/18 Ip
--80O727Q800 LER BO-1Q3/03L~0 on 800*22, while In Mode 3, operator
observed I -Ll-3-1 10, steam generator 4 narrow rancje level*
reading high Cause not stated Transmitter sense lines
refilled & transmitter cat Ibr checked
«EYNOLDa,R H Tennessee Valley Authority 80/O7/1B, Ip,
B007290S22 Forward* LER BO-101/'03L-0
CALHOUN.J R Tennessee Valley Authority 80/07/21 Ip
— B007290B27 LER QO-101/03L-0 on BOO&S2, steam gnn*rator level Indicator
J-Ll-3-Sl was reading 10X higher than other tuo Indicators
Caused by defective transmitter Defective transmitter was
replaced
H Tennessee Valley Authority 80/07/21 2pp
B007S5041-4 Forwards LEfi 80-071/03L-0
CALHOUN.J R Tennessee Valley Authority 80/07/22 Ip
— B0072304K. LER 00-091 /03L-0 on HOOiaa, uh (1 e in Mode 3, containment CUBB
level> 1-LI-A3-179i indicated appro* 10X in/other three-
indicator! reading lero Caused by defective loop
transmitter. Transmit ter replaced b callbr
REYNOLDS, R H Tennessee Valley Authority. 80/O7/82 3pp
8007af063A Foruard* LER BO-OWVOSL-O
CALHDUNiJ R Tennessee Valloy Authority 60/07/23 Ip
-- • 8OO7290fc39 LER BO-099/03L-0 on 800i23i valve 1-FCV-7H-39 failed
•urveillance testing, rendering one train of containment
Bpray sys inoperable Caused by limit iinifccha* being out of
ad juttment. not allowing proper closure 8ultches adjusted
BIRCHELL, R.C Tenneisee Valley Authority 80/07/22 Ip,
BQ0729066B Forwards LER BO-107/03L-0
CALHOUN.J R Tonnxse* Valley Authority
BO/07/HH. Ip
--BQ07290&73 LER BO-107/O3L-0 on BOOM!3, uhi le in Mode 3, oteam generator
3 level indication, loop 1-1-3-97, ind icated appron 1QX higher
than tuo narrout range channel* Gamed by defective
transmitter on panel 1-1-1B5 in accumulator roan 4
REYNOLDS, R,H Tennessee Valley Authority BO/07/82 Kpp
000729061 O Forward* LEfi BO-100/03L-0
CALHOUN.J R TenneiBtte Valley Authority
B0/07/2a, Ip,
— BO07290B18 LER BO-100/O3L-0: on 800623, containment Isolation It BUI-OS
exhaust valves FCV-3O-37 fc FCV-30-40 found to have
excessive leakagej Caused by debris under seating >urfaee
Debris was blown out tt valves r»»t«»tffd
DIRCHELL, R, C Tennessee Valley Authority 60/07/92, Ip,
BOQ7290762 Forwards LER BO-10B/03L-0
CALHOUN.J R Tennessee Valley Authority BO/07/23 Ip
— B00729O770 LER BO-108/O3L-0 on BOOi24. during normal operations, fuse i.
switching bridge circuit Fniloi) on vital inverter 2-1 which
rendered 120 volt ac vital Instrument pouer board 2-1
inoperable Cause unknown Fuse replaced
Tennessee Valley Authority BO/O7/23 Ip
BCQ7a9Q685 Forward* LER BO-110/03L-O
CALHQUNiJ R Tennessee Valley Authority
BO/07/24 Ip
— B007290A93 LER 80-110/O3L-O on B00i23,main steam flow loop. 1-F-2BA.
declared inoperable due to maint requiring vemoval of loop
front svc Caused by loop current disturbance Loop functioned
properly w/o test recorder & return to svc
LAFEVER.C M Tennessee Valley Authority, BO/07/24 Ip
BOQ729097B Forwards addl copies of LER BO-041/03L-1
CALHOUH, J R Tennessee Valley Authority BQ/07/S5 Ip
BO07890649 ForuiBrdS LER BO-106/Q3L-0
CALHOUNiJ.R Tennessee Valley Authority
BO/07/29 Ip
— Q007290&96 LER BO-106/03L.-0 on 800626, train E ERCU to turbine driven
auilliary feedwater pump isolation valve. 1-FCV-3-179B. found
leaking eacesilvtly from tell-tale drain Caused by valve
leaking through, Pump removed from svc d valve repaired
BOLES, 0,8 Tennessee Valley Authority 80/07/33 Ip
BOO7030195 Foi-iuardE ronunst for add! info TV Table 17 2-1, "Critical
Btruc tureni Sys !< Cumpnnenti, " for FS/lR.uihich identifies
items BUD j to operational OA pi ogi-am Info requested tij
BO063O
BCHIJENCER, A Licensing Hi ancti 3 BQ/O&/24 Spp
B007O103Ba Advises that util lias roceived no response to 79O920 request
•for ejtensiona until Mar !< De-c 1931 For Watts far 1 It 2 rtddl
safety requirements may result i-n conp 1 ot I on by Ja»i 1991
far SBciuoyah 2- Hay 19B1 Par Watts 1 I, Fob 19B2 Par Uatts 2
HILLS, L M Tennessee Valley Author jty BO/O6/26 Ip
BO078300D1 Format da statement ap pal icy TV i u-quire-mentB tu bo met for
current OL appl icat i ono, as 4erivBd from NUJteo-Ofa60 d found
i-n NUREE-069fl
EISENHUT, D 0 Division of Licensing BO/O&/36 2pp
80O7190472 Foiuards response to NUREQ-O57B. TMI -2 LeEBona Loar-nud Tasl
Forco status rept !< short-term PHI. ommBndationo Con&oHdatna
previous 1 tl s Includes revisions to r Qntalndiant isolation tt
• Maiding Items
HILLS, L M Tcnnesaeu Vallty Authority 8O/07/O3 Ip
B0072BOOO1 "TVA Keapon&c to NUREO-O37B. ahnft-Torm Losoona Learned
Requirements "
» T»nnBBBeB Va 1 1 B« Authority BO/O7^O3 SOOpp
S00715064O AdviBva that respcmte tc rBAR, Oueo t ion Z 7B> ul 1 1 not ba
oroanKed fc prepar-nd for subnittal until B00301
MILLS, L M Tennessee Valley Authority BO/O7/03 Ip
8007290A6H Foriuords revised LER BO-06B/OIT-1
CALHDUN.J R T«nniB»a» Valley Authority BO/07/23
IP
— BO0729O&73 Revised LER BO-068/01T-1 on BOOB30, uihi le in Mode 9, informed
that uide range steam generator level transmitters l-LT-3-
«i-3&,-9B fc -111 not qualified to withstand post-accident
environ Caused by use of improper transmitters
REYNOLD8.R H Tennessee Valley Authority 80/Q7/S5 2pp,
ao07290o73 Forward* LER 80-109/03L-0
CALHQUNiXJ H, Tennissea Valley Authority BO/07/23 Ip
— 8007270681 LER BO-109/03L-0 on 800626, during Bl~l<b6, containment spray
pump discharge check valve,! A-A, found to laak •(censivelv
Caused by valve leaking through Pump removed from svc fc
valva repaired
BDLESi 0 a Tennessee Valley Authority BO/07/85 Ip
0007290708 Forward* LER BO-111/03L-0
CALHOUNiJ.R Tennessee Valley Authority
80/07/33
—8007390713 LER BO-J11/03L-0 on B00o26, during normal operation, l-FCV-62-
136 (B train to luctian af charging pump from RUST) would
not open from main control room Caused by valve operator
torque spring being out of adjustment Spring readjusted
FOHINE,D Tenneisee Valley Authority SO/Q7/2S Ip,
T. Hearing transcripts on nun-antitrust matters
BOO7220061 Transcript o* ACRB BubcommittBB an Benuogah Nucl»»r Plant
B00709 ««oting In Washington, DC Pp 1-B66
» ACR3 - Advisory Commute* on Reactor Bafsouards 80/07/09
323pp
DOCKET S0-3aa BEflUOVAH NUCLEAR PLANT. UNIT S
A Application/construction stage documents !<
8007030228 Farwards NRC Otc of Nuclea-r Reactor Regulation BOD42B
r«oraani/ation chart Necessary period of transition made
w/nin disruption to ongoing activities
TEDEBCOiR L Assistant Director for Licensing BO/06/13 Spp
BOO70B0747 Forwards fniuests for addl info r» ihieldinfi review It
containment sump. Responses should be submitted by 800701.
Includes summary of shielding design review required by NflC
79110? ttr implementing Item 2 1 & b of NUFtEO-OS7B
BCHHENCER,A Ulctrniing Branch 2 BO/06/19 lOpp
8O070a07SS Foruardf commitments re steam generator imp ports d Row 1
• team generator tubes. NRC requires commitment within S days
re performance of required actions described in encl. Insp
ports must fae Installed just above upper support plate
SCHMENCERiA. Licensing Branch B BO/0&/B3 3pp
B007150672 Submits rut ommendnt I one re facility steam generators, i n
response to NRC BO0623 1 tr Camera device will be designed t,
tested for remote Incp of tube supports In lieu of addl
parts Mai active tub IF surface mar-gin will tie maintained
MILLS. L M Tennessee Valley Authority BO/O7/09 Epp
80OV1S0331 Forwards, info re Cate|jory 1 masonry walla, in rOBponeo to NftC
SOQ4B1 Itr Results of Inv&st igation oF inplace attachmonls
to meeonry walls uil 1 be submitted by 801017 Over a lie e-ncln
available in Central Files 431 pp)
MILLS, L M Tennessee Valley Authority &D/07/0? 4pp
— B0071S03SS "DeBipn Criteria for Reinforced Concrete Block Uallo "
BTONE.F A , CANNON.R U , LACY. F P Tennessoo Valley Authority
72/04/O7 S9pp
80O71SOS71 Foruards Revision a to util response to Item 2 1 An, NUHEO-
QS7S Revision incorparatBs leak testing procedures for
waste gas sys (App Et fc results of Van* reduction program
for Hq,uid d gas sija (App F)
MILLB.L M TennessEo Valley Authority HO/07/1I 6jip
— B0071BO37B SurvflilUfio Instruction BI"dl3f..nevlsioii lj "Waste Gfls flyo
Gross Leakage Teat "
KUEHH-L B Tennessee Valley Authority SO/O6/1S 14pp
— 8O07ISO3B2 Liquid sys Udti lest data
CHURCH, JW Tennessee Valley Authority BO/07/01 9(ip
B007160471 Responds to J Spraul Informal nuestions re F8AB Table 17 S-l
h forwards operational QA manual. App A* re critical lyv t<
Part 3i Suction 2, re matl tt spare parts
M1LL8.L M Tennessee Valley Authority BO/07/11 5pp
A,ro eriticfll structures, im»
8007)60-478 Operational OA manual.
components lint
OREEN.H J Tennessee Valley Authority, 7S/OB/1B &0pp
— B0071A04B4 Dperational OA manual, part 3, SBC tlunS, re motl to spare parts
* Tennessee Valley Authority 7B/O8/89 33np
B007B80O06 Nolif i cabion of B00723 fneetJnj w/utlls In Bethead*,MD to
discuss matters ra TMf-3 dated requiremvnt*
DROMERICH.A W Licencing Branch 1 KERRIOAN, J » , STAOLE.C R
Lieenfting Grancn 3, BO/07/16 fepp
B0072304&7 Forwards response to NRC 000307 request for commitmont to
meet requirements & as»oci«ted schedul«n in five specific
TMI items Includes *)iift manning, 1 irentino <M amina tloin t< '
lionseit disseminat ion of aperoting eiperletice
MILLSpL M Tennessee Valley. Authority 80/07/1B 4pp
BOO7830-177 ForuarJs response to NRC 8QQAI9 re^UBBt fur addl Info re
shielding design review, frioh range contalnmsnt radiation
raonitnr i- atcass eontro] of areas adjatent to spent fuel
transfer tubes
HILLS. I- M Tennessee Valley Authority BQ/O7/16 tip p
70
OO723O4BQ Forwards "ECQPAC Bnl id i flcatton Bji Process Control
Program., " Revision 4, In response to NRC 8OQ3Z4 request
MILLS, L M Tenna««ee Valley Authority BO/O7/IB lp
-B007E304BI "ECDPAC Solidification By & Process Control Program, "
Revision 4
* Tennessee Valley Authority BO/07/1B 20pp
K Utility Final Bafetij Analysis Report (FBAH> t amends
BOQ73O0374 Amend to OL appl icatian, consisting of Am*nd 66 to F8AR,
reviling Chap tori 3, 3, 3, A h 15 FBAR docunentallon of Item
transmitted by LH Mills BOOM 3 Itr fc responses to MRC
questions encl
CROSS. J-L Tennessee Valley Authority 30/07/99 lp.
•aOO7S304-B3 "Technical Sept on Urea Formaldehyde " Marked-up AmePco rept
on procedure Par analte sol Id i t Italian of lou iBvel raduiSBts
at fac 1 1 itij encl
» An«feo. Inc BO/07/1H 43j>p
— 0007300376 Amend bb to FBAR, revising Chapter! 3,3,5,6 fc 19.
* Tennessee Vallay Authority BO/07/8B 92pp
D Advisory Committee on Reactor Bafaguards reports ft correspondonco
OO7S30533 Forwards response to K Mendonca BOOA27 questions re reactor
vtsiel head venting sy« Hes tinghouse Is developing
procedures for xnad equate core tooling for recommended use
of vint sys by utils
MILLS, L H Tennessee Valley Authority BO/07/18 1 top
6007230013 Notice of ACRS Subcommittee on Sequoyah Nuclear Plant BOO7OV
meeting In Washington. DC to revisw EX. r»qu»«t
HQVLE,J C OfFlc* of the Secretary of the Conunliilon flO/Oi/18,
Zpp
OO723040B Poruar-ds addl info per MRC BOQtilf roqunt TB control of
centalrnent sump debris
MILLS, L M TennBssee Valley Authority SO/Q7/21 14pp
007290724 Foruards dsscrlption of prngram. "Training fur Mltlgittng
Cora Damage " Program ui* devvlapad to ensure that all
llcinisd operating flnvployees are propvrlu trained to lisa
available Info should act! Jen t occur Involving core damage
HILLS, L H TennesB«t Valley Authority BQ/Q7/33 9pp.
0073BOS23 Advise» NRC op svaluation of potential hazards in vicinity
of plant h of main control roam h.abi tablli ty »va fur
prot»cti<an from radioactive & toilc g*t releas*« Plant
op -era tor s are adequa te-lg protected from pot&lble haia-rdi
MTLU9.L H Tennessee Valley Authority BO/O7/24 lp
007290757 Forward t data !* draw in 9 a re settlBment monitoring Revind
QuABtlona SNP Q2 B4 4< BMP 03 73 uill be Incorporated into
FBAR In n»it anrnd Ha significant settlement obiorvBd,
Drawings available In Central Files only
MILLS, L H TennesBte Valley Authority BQ/07/HB I3pp
OO731039A AdviHffs. that short-torm items ti tuio long-term Items listed
in HUREQ-OQ11 rt main control room design rivleu have bean
corrected Utll commit ted to investigate feasibility of
corrffcting remaining items af first refupling outage
MILLS. L H Tennosiee valley Authority BO/07/E3 4pp
007310411 Submit! te*t result* of plant auiillary bid) gat traatment
*ys por raitulrementK aF BERiSuppl 1 Negative pressure equal
to or more negative than minus 1/4-inch water gauge
ralatlva to outside atmosphere ua> achleVBd In pump rnoml
MILLS, L K. Tennessee Valley Authority BO/O7/27, lp
OO731O416 Forward* addl info an temp control Par main s-taam valv>
rooms, per O Parr request
HILLS. L M Tennainee Valley AutharltM BO/O7/E? 2pp
Security, medical, emergency & fire protection plani
Foruiar<d> rrviivd commitment for fire protection program
re-evaluat ion. Section A 3(b)ire locking of ftre protection
water *y* valves Revision was ami* In response to IE Insp
R.pti 30-327/80-10 I. BO-32B/BO-OA
HILLBiU M TennenB* Valley Authority SO/O7/03 3pp
D07B3Q37S Forward! revised rad ioH-og ical emergency plan U/CTOSI- f»P
betueen flan t< NU'REO-0-i34 & App F. TN radiological emergency
response plan Encls available in Central Ftl«s only
MILLS. L M Tennessee Valley ftutJiorltij BO/O7/31 3pj)
OD7BQ054B AdvlsBE that Hastlnghouto reviouicd pouiei — aicension teiL
proceilurB's par Task Action Plan I tarn 1 C 7. Revi-eu of
emergency praceilureE ilocumentad by BOO4S8 Itr to LB
flubtmtein,
MILLS, L M Tenraisae Valley Authority BO/O7/B3 lp
007300431 Agraos.as interim step decided at MRC BOOTHS m*«tinj,to
•ipind near ait* pre*i facility tu provide for command
control function for emerflencii response Central amorgency
response ctr, p«T ubl] 8(10731 Itr i re((Ulr»t addl dlBcuiiion
MILLS, L hi. TennetBBB Valley Authority, BO/O7/S9, lp
decisions 'on '
•I • !< J j*> .
. 1 .« i in j • . 1.1 liir-i*
>• af
760413 menora-.
-I h 1- Tf 1
i / i ;« i H-H i« i K-IJ
| t iCtloTl
rn fire prate- i
i fn >lei
1 .1 •! *l 1 • ^
E1SENHUT, D 0 '
'isini 1
l>l 11 1| -'.<•',•
-,-lB
8OO7810Z4B Discusses review conducted at 343rd ACRS Meeting on BOO710-
12 of utll application to operate *t full power Facilltias
can be operated at leveli up to full power w/o undue risk
if items outlined are considered
PLE8BET.H S ACHB - Advlnoru, CammltteB on Rvactor Bafefjuards.
BO/07/15 3pn
BOO731O931 Responds to 900710 request r» p«rticular •npftcts of
facility Applicant caamlttad tv tipadlta initallatlan of
distributed ignition sys. No practical nffed to hold up
isiu-anca of OL pending completion of proposed sys.
PLEBflETrM 8 ACHS - Advisory CoimtttBe on fleactor Bafaguardfl
BO/07/ IS lp
BOO729O022 Foruards Ahaarne BOO713 Itr r> ACRB ravlaw of application
For autnorliation to operate
SCHMENCER.A Licensing Branch 3. BO/07/17 3pp
P. Operating llcenie stage docunents b correspondence
BOO7290679 Fnruiards preliminary asseisnient oP potential for barge tou
heading upttnam Impacting nnw e«t»ntial raw cooling water
pumping station Station not re<tuire-d for safe operation of
Unit 1
HILLB.L H TennB&*e« Vallay Authority BO/07/2B Spp
Q Inipection raports, IE Bulle-tine Ic correipondanci
BOO724O089 Foruards IE Info Notice BO -20, "Loss Of Dacay Haat Ra«ov«l
Capability at D«vi»-B***» Unit 1 Mhlla in RBfueling Nod a,"
No response required.
O'REILLV.J P Region 2. Atlanta. DJfflc* oP the Director, BO/OtVOfl,
3pp.
BOO7020I9S Foruardls IE Info Notice BO-SB, "Breakdowns In Contamination
Control Programs " No written response required,
O'REIULV.J P Region 2, Atlanta, OfMctt of the Dir-ector. BO /OS/SO
BOO72104B6 Forwardi IE Circular 80-13. "Qrid Strap D«map« in
Mest inghouse Furl Assemblies " No writtan respon** r*qutr«d.
O'REILLY, JP Region 2, Atlanta, Office of the Director. 80/05/28.
BOO701OH25 ForuariJ* IE Info Notice 00-23, "Lot* of Suction to Emerienc(
Feaduater Pumps " No written response required.
O'REILLY. JP Raglan S, Atlanta, Dfficn of the Director. 80/09/39.
lp
BOO7 190003 ForuardB IE Insp Rept* 50-327/80-19 h !)0 -329/30-18 on
8OQ5I3-16. No nonconpltance noted.
LEHIBrR C. Region 2- Atlanta, Reactor Operations Nuclear Support
Branch 80/06/0)3 Spp
—8007180011 IE Insp Repti 80-3S7/BQ-1V «. 30-328/00-12 on BOOA13-1A. No
noncompliancB noted, Major mrtat in»pect»d; preoperatlonal
tistingi program ravieu t< lmplnm»n-t»tion l< fcllowjp of
previously identified items
ABHENDEN- M, C. . BUTLER. B, D R«gion S, Atlanta, Office of th»
Director. UPR10HT.C H. Region 2< Atlanta, Reactor Operations
Nuclear Support Branch BO/06/0*. 4pp
BOO72I0029 Forwards IE Info Notice 80-24, "Evaluation of Contractor
OA Projrami, " No written re«pon»e required,
D'REILLV, J.P. Reoton S, Atlanta., Dffic»,of thevDirtctOT. BO/M/10.
3pp.
171
8007160287 Foru*rd» IE Info Notice 80-27, "Degradat i on of Reactor
Coolant Pump Studs " no Hpecific action or re»ponse
required
0'fIEILUV.J P Region 2, Atlanta, Office of the Director 80/06/11
IP
9007250384 Forwards IE Info Notice BO-2B, "Prompt Reporting of Irtfo in
Accordance W/10CFRSO BS(e) " No written resonnie required
O'REILLY. J P Reoion S, Atlanta* Office of the Director 80/06/13
3pp
8007290846 Forwards IE Insp Bept 50-328/00-13 tin BOO922 i 33 No
noncompliance noted
BTOHR.J P Region H, Atlanta, Fuel Facility & Matertals Safety
Branch 80/06/19 2pp
OOD71706C.4 Part ,2! Final ic|it 'P Wi'st i n.ghiiu«i> (lioinifil !'
BUS centrifugal <.h.iro.i»g pumpa following mtiinitnrg i.i«l*
enorgy I live rugturo t. U5 sue i * Loll i «.>*n Hit Lnp.min flow
not lie met Emergeniy opoiutii*u |nnc tdiit-m modified
MILLB.L M Tonnossue Valley Authority flO/O-WHI «PP
vol rnritrul
P p ty-rif Iriteil
'I'
H007020943 FocuariU flii.il dPfitipn.y lopt r
Inside containment
MILLB.I- M TDmii'StfBD V.illcy Authority
— BOO703054^ Final di-f n. i *nr y rrpt ri> Ljifutg related LUlila in
containment Ut 1 1 will turncl miuioed cnlili- '< tormina! bi
fag running cables i " eoiiilui I, whith uill prdvtile miPPIc Hffi
shiuldiriQ Fur Hiisl i F ication tn I *ma i n v.i 1 L (1
• Tentiosaeo Val UiJ Authiiritg (IO/06/afc 2pt>
—0007390833 IE Insp Rept 3O-32B/GO-13 on BOOSaH t< 23 WD noncomp 1 ianc
nottd Major artai Inspected preporatlonal d aper^fcional
•nviron monitorino progranB
JENKINS, O R Ragion 3. Atlanta. Fill! Facilitg & Materials Safety
Branch CUNNINGHAM. A L Region 3, Atlanta, Office of the
Director BO/06/17 Ipp
B007020391 Forwards IE Circular BO-IS, "Loss of Reactor Coolant Pump
Cooling fc Natural Circulation Cooldotun " No uritten response
required
O'flEILLV. J P Region 2. Atlanta, Office of the Director 90/0&/2O
BOC7110034 Ack receipt of 8O0533 Itr informing NRC of staps talien to
correct violation noted in IE Insp Repts 90-327/BO-14 fr
MUBPHY.C E Region 3- Atlanta, floactor Construe tinn !< Engin«erinB
Support Branch BQ/C&/24 lp
B0071I0039 Submits oddl response to HHC 00O3O1 Itr re violation notod
in IE In*p Repti 30-327/BO-H & 50-32B/9Q-OH Carrective
actions all Section 3 surveil Innco instructions comply ia/
Section 11 of ASHE boiler code
HILLS.L.M TenneoBBB Volley Authority OO./06/09 la
BOO7020944 Foiiuards fin.il i)*f it i encij my t ro ul d» itunffl joriinlotflr
1 avol triinsmi ttor<
MILLS, I H renncfiioo Volley Authority HO/Oft/Sfa lp
— HO07Q205B1 F(nol dnficientg r»|il ro luiile 'nrlQi1 » learn fleiiiiPii toi Itfv
traimmittei 6 TranBmi tters will be i-oFilerifd Itij quallfleil
tranomltturB InttalJottun uJlJI liu Lom|iloteU hifPoru
preopora tional I eating a t aijc
H TennosaOD Valloy Autlnirlty (lO/Oft/f'6 1 1>
aOO7O90P4V Forunrif* rtvlBnd final d cf i r i uric g rupt i o api'iit Puo I |H»ol
ga tes
M1LL3.L H [onnDBRoo Valley Authority IW/D//0,' lp
— HQ07Q7Q33B Roviaod final nfsPiciennj rept m «ipont find pud! gnli-o
Ooti-R are not designed to UviEl^ic Citing «nj 1 i nun 1 ruraen (.n
por fleo Guide 1 13 (1A aEliocti. of flute lnU-o'' I Ig will h"
verified Fnr all throo plontn
« Tennussue Valleu Aiithorl LIJ »O/0//Or' Hpp
BOO71 40443 Foruiardo flrot interim il ef ic i piiru ntpl re floUntin' tiultchi
onviron tiualif itat '»" Wl ' ' r<u!>m!t nu. t ivpt hu tiOnitU'
M TannotBOt Valloij Authority f!u/07/<17 lp
BOO7170070 Foruarda IE Circular 80-14. "Radioactive Contamination of
Plant Demineraliied Hater Bui & Resultant Internal
Contamination of Personnel " No written responao roquir-ed
O'REILLV.JP Region 2, Atlanta, Office of the Director 0D/Oi/24
IP
— Q007I40456 First Interim di>ri i i mir v '"P1 re «nl«i(tin MJ) tcl'BO
qunllfl cation Unriiifl i wl ou u f nuiitth contmcl ilur umantt .
documontatlDn not «n f i IIP to oubt> tiint iotif Unit auiltuliuo are
onviru-nmcn tally qttal i f l«d to uithnLimd lump
* ToimasBL't Vfll 1 oij Anthiiiltg 1)0/07 /OV lp
B007230233 Forwards IE Bulletin UQ-li» "Potential Mi aapp 1 ication of
Ro* (mount Inc Models 1131 fc 1192 Pressure Transmitters
W/Elthnr A or D Output Codes " Urittsn roaponsc reo.ulra<l
IE Circular 80-16 also one 1 No uritton rosponae required
O'HEILLY.JP Renlon 2, Atlanta, Office oP the Diroctflr 8O/0&/H7
IP
B0070B0331 ForuarUs responaa to Deviation Item 50-337 /B0~ 17-01, noted in
IE Imp R«pt* 90-327/80-17 tt 50-320/80-10 re inadequate fire
barriers Required Insulation installed on seven cnnduitsr b
cover plates reinstalled on three conduit fittings
MILL9, L M Tvnnatsee Valleg Authority 90/06/30 app
BOO 78 1003 6 Forwards responie to IE Bulletin OO-O8 re-eiaminatian of
cantalnMBnt liner penetration weld* Penntratlans at
S*quayahr Watts Bar Si Dellefonte contain flued head design
Design For Ytllou Creek not ijet completed
HILLS, L M Tennessee Vallog Authorltg HO/O7/OB 5pp
8007230494 Responds to NRC S00625 Itr re deviation in IE Inap Rept
30-328/80-11 Corrective actions nondestructive- siamintf"
wore cautioned b reminded that ang <« all failuree to obtain
complatr leans must be documented
MILLS, L H Tennessee Valley Authority BO/O7/17 2pp
80072B0498 Forwards addl responsH to IE Dull&tin OO-O&j "EngineorHd
Bafetg Feature (ESF) Raset Controls " Present contrnl
schemis ddeauate Equipmant evaluation end
MILLS, L M Tennessee Valloij Authority !3O/O7/ai Spp
B Rupor-talilo occurrencD&> LERa d related
8007160571 Forwards final deficiency rept re chemical fc vol control
centrifugal charging pumps
MILLS, L M Tennessee Valley Authority SO/Ofi/'in lp
B007 \fiOiilili Bocnnd inturim Uof-lnonrg i i'pt rn eiiviriin qiial Ifi cot lo» uf
Clast IL iitHtrumenta in vulvc room All liiBtr iimBnta Ufa
being ffv.i luatfi) Nuit rept mill be sutimi lloil Inj EIOOVIL'
MILLS.L N TffnnesnDo V.tllPij AutlHirily m/Of/QJ I |i
00073304^1 Tlrfit interim doflclency rupt re nnviron qua 1 i f l tfl frloii of
Clans It «nulpnil)tit Uti 1 chcrMtig Piluc !i pi- 1 1 1 urn i mj
manufac tuToro of cnmpnnunte for ruqmiuil onvirun
doeuiiMiTitot I on
MILLS, 1, M TunnonnpD Valley A.ilhorllu f)0/O//li Ijip
eOD72304B6 First Intprim derirlancy iff I re nnfwtu hijnitlitn |Him(i
brealier luctiout, ini tin) lij r fjuir toil DOOfil1? No vi ouji I nr
fltudial IniflLBtion wlien lockout cuniiitioii i-ilvtE I'lulilun
undor inves tlDotlon Ncit rffj>t t« \>i- BiiLiml I toil by uwili;"!
MILLH.L H TPTinBCBeo Vollcv Aulhnrilij tlO/07/Kl :>pp
6007290632 Third interim dePHloncij tupt. fo UIU htjdr ,111) 1 L inOlnHnn
vnlve accumulator uicighlny t><i< Lilil I- Uo« I in(|Jioii»« iiru
l»ur»uin<j solution to problem Nint rt'iil will tin r ulnnii ttvit dy
B01001
MILLS.L M Tonnifsr.po Vnllcy Aulhnrlty i!(l/0//I') Lp
B0072VDA10 Bccoiid Interim ilelnlfiiry ri-p( re ilpfDrtlvw iiiaitnr vLMino-l
upper internals Qiiidu tube tuppui I piim MpuLinghnitiir hm not
completed ovuluation »F pinr tahvri Tvum (iiicrn t ing plntit
No»t topfc will be foriu-irdifd btj UfW/l ]
0'IIEILLY, J p TonneBSBf V#]lr-« rtuthniitg («)/(l//;'4 lu
T HBJinrio trsnmrjplt on mill- tiitt- 1 li nijl oiiitttro
HOO7320D&I Trnnutript of rtrOd find i ornmi tl in- un Sni)tiiiijnh Nut I Hrtr I'luiit
O00709 muoling in Mash inglnn. 1IC f'p }~ilkh
•* ACftB - Advisory Cuinmt t fcui1 nit RHJU tni tiiif i»gudnln
— 8007140378 Final deficiency rep t re potential For degradation of ono or
more chemical & vol control uys centrifugal charg Lng pumps
Dtiign Si plant emorgencu oporatinS procedures will be
modified, 35 recommended b-y WeElinghouso
» T*np»«B« valley Authority QO/OA/10 Spp
72
DOCKETED ITEMS
OCKET 30-339 MIDLAND PLANT, UNIT 1
ApS 1 1 cation/construe tiofi stag* documents i. corresp ondsTice
10070201159 Discusses D Honii 791001 memo re potential Fur post-LDCA flou
blo-ctage Far PWt plants caused by containment sump screen
deficiency Assessment needed to determine whether Board
notification necessary
vARCA.B A As^litant Director For Light Water Reactors 79/11/26
IP
-BQ070201c,7 DISCUSSES 79IO31 telci.n u/util re 7-JO9I7 trip rept at
containment Birmp screen deficiency It BfcW concern Te
potential for post-LOCA floiu olotkase Review requested tn
determine whether Doard notification necessary
HOOD.D Light Water Reactors Branch 1 79/10/31 lp
BOQ733Q507 Lists drawings h s»etchan submitted by util found to be
partially Illegible Independent c onf inflatory piping analu»i>
requested bg NRC cannot lie performed until better capita
are obtained
BATCHi J a Hockuiell International Corp • Energy Systems Div
8O/07/07 2pp
BQO719O477 Comments nn proposed aildl guidance on potential for low
Fracture toughness t* lamellar tearing of t-WR component
a. up port structures NRC gentric guidance invalidates many
support designs developed per past: applicable codas & ttdi
COOK, J M Consumers Power Co HO/O7/OS 4pp
BOQ734OQ4O Hotification of BGOBO3 meeting u/util in Bethe»dai MD to
discusi *chedule» for const t< licensing review
HOOD. D S Licensing Dranch 3 BO/O7/09 4pp
007020151 Requests infa from CP fc OL applicants re BA Varga 79112&
nemo an post-LDCA floui blockage For PUR i> 1 ant E, baaBi) on
insulation type ti sump screen mes-h sl?e Evaluation necessary
to determine whether Hoard notification necessary
M ATT SON, R J Division of Systems Safety 79/12/13 2pp
i0073103H4> Forward! TR-3B87-3, "Acceptability for Svc nf Midland
React or Pressure Vessel Anchor Studs." Revision 1 Related
correspondence
DODBDN.W Q , CCOPER.W E Teledyrie Engineerlnn Services 80/05/15
IP
-8007310387 "Acceptability Fur Svc of Midland Reactor Pressure Vessel
Anchor Studs." Revision 1 Related corre spond-ervce
* Teledyne engineering Sorvicc-s TF1-3EIB7-2 HI NO1 BO/O3/20
007010397 Forwards NRC reogani lat i on chart for Ofc of Nuclear React
Flegulationi effect! VB H0012B Considerations re activities
should be ramie through assigned mgt represents t i VCB Areas of
disagreement mag be discussed through informal appeal
TEDESCO.R L Assistant Director for Hennaing 60/06/13 Hpp
007070119 Forwards "Model Testing of Containment Bump ECCS
Het irculatinn Intakes," prepared by Uesturn Canada Hydraulic
LabB.Ltd, fot- Ccchtal Pouisr Co Comments on NRC 770917 trip
t-ept a-ncl
CDOK.J W Consumers Power Co 60/06/3A lOpp
-Q007070130 "Model Testing of Con tainmant Sump CCCB Roc ircirlation
Intakes," prepared for B-echtol pDUEr Co t< util
» Western Canada Hydraulic Laboratori es. Lid B07O4X30 92pp
8007210403 Foruarrtt updated FBAR Page* 3 B-24 through 3 e-S<bn, Pajm
17 1-11 throujjh 17 l-14h d Question It Reeponse Page* 17 1-1
through 17 1-1 in response to NRr BOO322 Itr H/o encl
COOK.J W Consumers Pouer Co SO/O7/lfl Sup
BOO7300104 Notification of B00731 meeting ui/util b fiechtel in Betliatdn,
MD to discuss addl Info on plant fill
HODD. D B Licensing Dranch 3 , BO/O7/31 4pp
BOO73002bl Notification of B 007 33 & 29 meetings b plant tour w/utll S.
Bcchtel tfl assess const completion schedule! Meeting agenda.
* FR eier-pt end
HOOD. D 8 Lieeneing Dranch 3 BO/O7/21, 7pp
BOO 72 9 0036 Notification of 300621 open meeting u/util In Bathaida.HD.
originally scheduled QOOSOSi to discuss const h licensing
rftview tchedules
HOOD- D B Licensing Branch 3 BO/O7/22 Bpp
QDO727O701 Objects to inclusion of proposed amends from 10CFR170 S3,
Footnote a, which eicepts such anandi from license) fae
requiremeTits Requests reconsideration
BIluNMER.J E Consumprs Pouer Co GQ/07/22 3pp
— 8007370707 Respond* to 800403 1 tr objecting to f»r» for 771219
application for amend to CPo Conmiission 791304 order do»
require appl Uatlon. therefore, «»e»ption to 10CFR170 32 is
not app 1 Icabl e
MILLED, H 0 License Fee Management Branch BO/07/03 lp
F SECuritiji medical, emergency d fire prntectlon plans
O0733OOO1 Foruards statement of po-Iicy re req.uir ements to be niet for
current OL app ] i c fltiona. as derived from NLJREQ-0£i60 & Fourd
in NUREQ-Oi9*
EIBENHUT,D a Division of Licensing 00/06/56 2pp
OO71B0081 Foruarils request for adfll info re plant fill to support
roquired geDtecbnical englnterJiiQ studies for reviou of
responsBi to HRC 791119 request
SCHHENCER.A Licensing Qranch 3 00/06/30 -?pp
BOO701Ofl73 Discusses proposed clunge to 10CFR3O adding requirement for
fire protection plan at facllltlas Forwards comm*nta on
rulei supp 1 ementing consultant comments Questlans
a.pproprlateness of rule, since rule reopens resolved issues
HOFFMAN. D P Consumer* Power Co HO/06/27 Gpp
BOO70TO393 Summary of B00611 meeting u/util & Dechtel in Bethetda.MD
re Becuritu plans to protect against radiological sabotage
HDuDi D Licensing Branch 3 flO/04/30 4pp
i007EBOOfaO Rtspondi to NRC 800533 Itr requiring tuo actions prior tD
resumption of safety-related work bij Zack Co Limited work
that is perfnrmed ul 1 1 be evaluated t- if acceptance level
of -confidence is atta ined. then full production can resume
CDOK. J M Consumers Pouer Co SO/06/30 Bpp
QO7230116 Advisrb that util is not eiompt from Fee r equipments for
791E17 application fur CP amends Any CP amends to be issued
ti\j NRC are not sei>n as resulting From 79IHO& nrifer
MILLER, W 0 Mcenan Fee Manngeme-nt Branch BO/07/03 lp
IOO7S80O41 Submits revised facility project schedule Integrated S-unit
startup program rftainei! Eept 19HO NFiC Ve 1 ] oiub ooli update
transmit tal uill reflect milestone dates baaed an listed
camp 1 etion dates
MILLER, D B Consumers Power Co 80/07/03 ip <
I00714O49& Summanj of 60052:1 meeting m/uti 1 , Oecti tel, D*W & Teledijne in
BethesdaiMD re three reactor ve-siel hold-douin stud a
pr* lervice Fa i lure
HaDD. D S Litenting "ranch 3 BO/07/O7 lOpp
KJ071BOOID Fc-ruards guidelines For solamic *< structural design anali/iii
audit planned as part of revteu of Oi application Info
sheulrl b* filled in on guideSino forms prior to audit Audit
will take five uorklnp, day a
SCHMEHCER.ft Licensing Branch 3 HO/07/07 lC17np
0 Adjudicator^ correspondence
3007080091 Petition to intervene re order for CP mod, al leg Ing that nod
uill result in unsafe d inefficient Biircls* of .atomic
energy use t< will create adverse environ effects
Certificate of Svc encl
WILSON, 0 t Affiliation Unknown HO/06/34 3pp
BOO707O2fla felition to intervonn in CP nod proceed ing. all eg ing that
unresolved soil settlement problems will cr*ate adverse
safety problems Certificate of Bvc »nc 1
MILLER, T R Affiliation Unknown 80/06/29 3pp
BOO70B0039 Petition to intervene in CP nod proceed ing> alleging that
unresolved soil settlement probleeis will adversely affect
safety b uill create inefficient eiercis* of atomic energy
use Questions integrity of const* Certl f leat* of 8vc end
RACE.MA Affiliation Unknown BO/06/ES 3pp
BOO7G10243 Foruards Commission 800587 memorandum fc order containing
decisions on UCS 7BO502 petition for reconsideration of
T90413 memorandum ti order UCS 771104 petition sought action
re fire protection for electrical cablei
EIBENHUT, I> 0 Diviaion of Licensing &O/0&/2S B"?pp
8DO7oa0054 Petition to intervene re order for CP modi alleging that
unresolved soil settlement is-sue will create advene safety
problems -t< mill result in Inefficient exercise of atonic
energy ">* Certificate of Svc encl
REIST.S D Affiliation Unknoun QO/06/2i 3pp
173
9007020592 Memorandum b order grunting NRC BOOM 6 request to postpone
response to CPC BOO 52 7 (notion Be** ing consolidation of soli
conditions & plant fill matls issues re DL l< order far
licentu nod proceeding*
SMITH, I W Atomic Safety and Licensing Doard Panel BO/Oi/a/ lp
0OO701O333 Ack receipt of B00617 Itr re recent containment bldg
publicity Util Itr rr Inconsistent cross-referencing between
BliH fc BBC rite 1 encl Further rept an issue will be provided
whan available Repr«*entation status requested
PATON-W D Hearing Branch 4 BO/06/30 2pp
BQ07140017 Petition In apposition to utll motion for consolidation re
79120i order modifying CPi Urges postponement of response
ti requests that activities be stopped due to deficiencies In
const fc «af et«-rolnt«d structures
MARSHALL, H H Mapleton Intorvenors BO/Qb/30 2pp
BQ070V0049 Response stating no present opposition to HA Thibodeau.TR
Miller. PA Race.B 8tan>irls 8. C Qllnert petition* to
intervene Reserve* right to oppose participation In future
development fc urges consolidation Certificate of Svc encl
MH-LEft, M I , FAHN6LL,A fl, Consumers Power Co MILLER. M I It him,
Lincoln h Beale BO/07/01 Spp
H General correspondenc i
O0Q71B01fia Opposes const of facilities Great Lakes region would be
destroyed if TMI-type accident occurred
» Affiliation, Unknown SO/OS/ 16 lp
800711O4BB Responds to 000605 Itr re NRC maps of reactor vessel anchor
bolts Bolts are susceptible to cracks in tliroad area due to
original bolt specs, sel ection of matls t< method of heat
treating NRC reviewing revised design tn determine adequacy
STfiASMA.J Region 3, Chicago, Office of the Director BQ/06/23
»P
8007880323 Responds to SOOSal Itr requesting info re PA U'Archangel
request that NRC expedite facility licensing Addl NRC effort
resulting from TM1-2 accident caused delays in licensing
Development of schedule for review of application underway
DlflCKB.H J Office of the Eiecutivi- Director For Operations
so/07/oa Spp
--30072B0536 Requests response to encl PA D'Arcliangel 1 ti requesting that
NRC eipodlte facility licensing
BAHYBn.H S House of Rep BO/05/?! Spp
BO0707D033 Rssporne in xupport of C Oilbtrt B00616 petition to
int»rv*n« in CP« nod proctedlng. Btandina requirement
•atlifltd Ruling on contention requirement premature
Certificate of Sve ancl
PATONiH, D Hearing Branch 4, 00/07/07 ipp
DD07140080 R»ipon«* itjtlna no present apposition ta SK Warr»n, 9D
Relit, OC Million t, HA Race petitions to intervene re licenai
nod Reserve* right for future objection & urges
ropresentation by ilnfile spokesman CertlPUate of Svc encl
HILLER.M I , FARNELL.A H, ConEumeri Power Cn H1LLER.M I Isham.
Lincoln ti Bnnle. BO/07/OB 6pn
0007170226 Rttpon** in lupport of MA Thibodeau, TIT Miller. OC Hi lion, 3D
RalttiPA R«e»i8 Wnrr*niMA Race It B Btamiris petitions to
intervene rtf 771206 order modifying CPs Ruling on adequacy
prvmaturv Certificate of Bvt encl
WON.W D H»*rlng Branch •» BO/07/ M 6pp
8007170232 Response in support of WH H«r»hsll 000623 petition to
intervene re 79120i order modifyinfl CPs Ruling on adequacy
preiwtur*. Certificate of Bvt end
PATON.W D, Hearlns Branch 4 80/07/14 6pp
B007S20194 Response to Mapletnn Intorvonor » 800630 petition Argument
re consolidation untimely, Requeit to postpone NRC respant*
to CPC motion moot Boll-related i»suu» are within scope of
OL nroCBtfdlng fc NRC 7<tlttQd order Certificate of Svc end.
H1ULER.H I Consumer* Power Co MrLLrfli M 1 Ishami Lincoln d
Be«l« 00/07/19 Bpp
B007140634 Requests response to out I WH Marshall Itr re Oc t 1979
request for info .ibout facility Request unanswered
ALDQBTA'D House of Rep 80/07/09 2pp
— QOO716O649 Provides list of conditions fur which info is requested re
safeguards for public health t, safety Also requests
resolutions re crac k ing, debater ing, bldg settlements ti
caisons problems, per NRC 7VO3S3 *- O305 meetinoa in 1L
MARSHALL, H H Hapleton Intervene™ 79/07/01 app
Q007230!90 Responds to Q00603 Itr ra frequency of correlation strenflth
test sampling on new aaf ety-re Utnd concrete NRP position
reflects increased testing during ppriudu of law vol
placement
SCHHENCER.A Licensing Branch 3 00/07/09 Spp
B007130697 Foriuards current rules of practice W/o encl
PATQN.HD Hearlnj Branch 4 BO/07/11 lp
K Utility Final Safety Analysis Report (FSAfl) t, Amends
B007240146 Updated FSAK Pages 3 B-P4 through 3 E]-P6a,FSAFI Pages 17 1-11
through 17 l-14b F< Question & Response Pages 17 1-1 through
17 1-4 to be included In FSAR. Revision 2, in response Cn NRC
800323 Itr
* Consumers Power Co 00/07/14 llpp
0 Inspection leportBi IE Oullntln'i !< corresppinlenco
B0071703B3 AdvJus that HH MarshalliOf Mitpleton Intervenora S00430
pititlon to MLB should not be given consideration at
present stage alnce intervinor not yet admitted In
proceeding
ftftQH,U D Hearing Hritnch 4 HO/07/16 IP
BOO71Q0242 Respond* to 800110 Itr urging NRC action to *top const Issue
will bo «ub«iltled to ABUB uho has proper jurisdiction over
Milter in controversy Reminds of MflC position that MM
Marshall ha« standing to intervene
PATON.H D H»«rlnB Branch 4 BO/07/17 2pp
BO073Q0421 Advises tint utll ti Bechtel l>ow»r Corp have reached
agreement on revised schedule re conmercl"! operation of
Units 1 fc a. Unit 3 acheduleiJ for connn»i-ci«l operation in
Dec 1903 h Unit 1 In Jut 19B4
OIBBS.H E Iihflm, Lincoln d Dual* 80/07/B2 lp
8007390730 Order fc notlo of B007IO upeclal prehearlng confer»nca In
HidlandiHI TO identification of issues, rul ing upon
intervention petitions h other rulated issues Public invited
to attend ui/o active participation
SMITH. l.H. Atomic Bafatu. and Llcuntlng Board Panel BO/07/24 3pp
0007ilv07!12 Ord«r denying. Mapltiton Intsrvenors' 800630 petition uroinj
ASLB not to con* liter CPC motion for consolidation Intervenor
MU respone directlu to motlott.
BrUTH I H, Atomic Safety and Licensing Board Panel, 80/07/24 2pp
B00727076* Memorandum t> order ruling tint petitioners PA Race.B
BT««i«rls,SD ReUt.BK M-rren.TR Miller, MA Rate. 00 Wilson, HA
Thii»de«u t C gilbert hav» satisfied interest fc aspnct
requirements Conference re Dt, will be »et for B00910
BHITH, l.H Atomic BaffltW and Ulten*lno Board Panel BO/07/24 3pp
B006300114 Forwards IE Insp Rapts nO-->29/90-13 I. 50-330/30-13 on
BOQ3Q1-31 No nuncompl lance noted
FIDflELLI.O Region J, Chicago, Reactor Construction d Engineering
Support Branch BO/09/14 £pji
— B00630013B IE Insp Ropts 50-UB9/f»)-l? !, IiO-330/BO-13 on Q00301-31 No
noncomp 1 lance noted Major areas InspcrLed exam of site
conditions !< tfetensioning reactor vessel holtfriouin bults
CDOK.R J , KNOP.R C Region 3. Uuengo, nfFlce nf the Director
BD/DS/13 Spp
B007210360 ToruardK IE Circular 00-13, "Grid Strap Damage in
Heitinghouse Fuel AssemblleB " Nu written response required
KEPPLEH.J 0 Region 3, Chicago. Office of the Director BO/03/?a
IP
8007010144 Forwards IE Info Notice EJO S3, "UnSB of Suction to Emerge rug
Ffieduater Pumps " No written relponm' required
KEPPLER.J O Region 3- Chuagu, Office of the Director QO/05/39
IP
B007020M9 Forwards stjtus of actions to pnivide corrected response to
IE Bulletin 79-02 Final response or r.tstuB rept will bo
submitted by SOI03I
CDOU, J U Coniumers Power Co BO/06/09 4pp
B0072201B3 Forwards IE Jnfo Notice 80-36. "Evaluation of Contractor
OA Programs " No written response required
KGPPLER, J Q Region 3, Chirago. Office of the Director BO/OA/10
Forwards ic Info Notice 80-27, "Dugrnd a tmn of Reactor
lanl Pump Studs " Mo specific rtction or response
u i red
PLER.J Q
Region 3, Chicago, Offico of the Director
B0707 Forwards IE Info Nolica 80-28, "Prompt Report. n9 of Info in
ordantf U/1-OCFflSO- 55<e> '• No uritten resonnie required
PLER.J Q Region 3. Chicago, Office of tlie Director aO/Qfa/13
R Periodic operating Deports ti related correspondence
BOQ72BOI24 Foruardt Declitel nonconf ormanca reptsiOA audit finding r«pt,
mat corrective action rept.HdW repts of nonconformity fc uttl
nonctmf ormancH repls, audit finding repts !t corrective action
repts for June 19BO
CDOK.J W Consumers Power Co BO/07/21 SibOpp
0 RepoTtable Occurrences, LEfis & related correspondence
130306 Responds to IE Bulletin EO-Q9, "Hydramotor Actuator
icienciES " Vendors evaluating which actuators nil 11
uirfl mod or replacement 'i which ujill meet spec
Uir gme-nts re spring & smug nomograoh problem
IH. J W Consumers Ponier Co BO/Od/17 app
B00731O3B6 Forwards T PI -339 7-2. "Acceptabi 1 Itg for Bvc of Hid land
Reactor Pressure Vessel Anchor Studs. " Revision 1 Relatftil
corr etpond once
DOUSQM.W O , COOPEtl.M E Telodyne Engln-eartng Services 00/09/1 a
IP
•3Q4Q3 Forwards IE Insp KeptE SO-SSI/SO-lt * 50-330VBO-17 on
KOI- 3O No nonciimpl lane c noted
REt-UliQ Region 3i Chicago, Reactor Construction 6 engineering
port Branch BO/D6/I7 2p p
— 0007310387 "Ac captabi li ty tof five of Midland: Reactor Pre»»uro- Vas
Anchor Studs," Revision 1 Related correspondence
* Teledyne Engineering Sirvicea TR-3BG7-2 Rl N01 60/03/20.
S3pp
IE Inan Flenls 50-329/eo-l fa !, SO-33O/BO-17 on 600101-30 No
one nmpl liinc e notad Major areas inspected site tDnditionci
-BBC tor v-E-stel hiolddcun. bolti (, Unit 1 rpactar- coolant
:DOK,R T Region 3, Chicago, Office of the Director HAVES, D W
legion 3, fhiiago. Reactor -Construe tion & Engineering Support
IrancN 60/06/05 Ipp
130562 Forwards IE Circular HO-15, "LOSE of Reactor Coolant Pump
illTi} & Natural Circulation Coo Id own ' No written response
]u ired
'PLER.J G Region 3. Chicago. Office of th o Director BO/Qb/BQ
170467 Forwards IE Circular BO-lfl, "Radioactive Contaminnt Ion of
nt Oeminera! i led Hater SUB i* Resultant Internal
itaminat i on of Pereonnol " Ho uiritten response required
aPLER.J G Region 3, Chicago, UPPim of tho Director BO/Q&./24
300300 Forwards IE Insu RnptS 30-JBWBO-10 & SC-330/HQ-19 On
390-1-31 Mo none umpl i ance noted
IflELLI.G nrgion 3j Chirac, Realtor Construct i an fr Engineering
iport Blanch flOVO/j/St 3pp
17300301 IE Imp Repts 50-32WBO»tB (< 50-330/BO-1C9 on 000501-31 No
noncnmpl iancp rioted Major areas inspncted BUEpect pipe iiihip
rBStraint bol ting, const activities of Zsck Co. detunsionlng
if react n-r vessel tin Id nun bolts l> aurlit of Poabodij Tasting1
COOrtrF) ^ . KNDP, tt C Hegion 3. Chicago. Office of the Director
DO/Oi/24 7pp
23035B Koruiards IE trullutin Bu-16. "Potcnttal Miaapul lea tion of
semount Inc Moiols 1151 ti lisa Pressure Transmitter!
tther A or D Output Codes " Mr It tun response required
Cliculur HO-l/i alao one 1 No written response required
PPLER.J 0 llegion 3, Clucngoi Office of the) Director BO/OA/37
170AE3 Toruardm IE Insp llepts 9O-:iE7/aO-| 3 t. 50-330/BO-li on
0602-03 No noncomp 1 iance notci]
OflELLI.a Region 3, Chicago. Rcattur Construction t< Engineering
pport Branch BO/06/30 2pf
071706:15 1C Inap Repts 50-329/BO- 1 1 t< 30-33O/00-I6 On BODi>Oa-05 No
noncomp l ianc e noted Major arnvae irtpettnJ records & teat
results of atenra Deneraloi anchor bolts tt pipe rnGtraint
baits
VAHBE-L.t E . ERB.C M . (M1DU.K R FlPdlon 3, Chicago. Office of thn
Direc tor
Provides interim response to IE nulletin aO-08 re
amlnation uf l»ni?r pene tratioi? uclds lutludee. liat of
netratlon infu un joint tijpeiflupd hsad fnatl,aleevo matl b
amBter, typo of einminotinn ji irftirmod & repair info
IQK.J M Cnn&urncri Power- Co HO/07/i] 1 [ p r>
'31O521 rtc ^ rcreipt of BO0630 1 tr Infuiming NUC of steps taken to
irrect const prnbli'm-t noted in IE Insp Repts 50-339/90-1* &
IPPLER. J 0 Region 3, Chicago, QfPtce of the Director
107310539 ForuiflTdf. response to NRC BOD&i>a Itr re con-it prablafflB noted
in IE Insp Ropti 30-32.') /Bit- it (. SO-330/SO-1 3 Corrective
actions 2ach Co QA manual •!. QC toiitrn! protadures uere
reviauied foi ii-de<i|ua[4j & clitrliij
CDOK, J U Consumers Poiurr Co BQ/Qkf3rt Qpp
8007160807 Part 2] repb re defective faitener matl* A490 (< AMD
supplied bg 9nuthern Dolt It Fastener Corp for sit* aBcenbly
!< inital lotion of pipe uhip i-eEtraint» Possibly oumd bg
Improper heat treatment or wrong matl 6 supplied
HARD I BON, D NPB Industries, Inc BO/Od/li llpp
0007070-197 Ac» rscelpt of 000613 interim deficiency; rtpt ro co«pon»nt
qualification test documentation re-r-evlBU
FIORELL1.0 Fegion 3i Chicago^ Reactor Conttruction fc EnflinBerlngj
BuppQrti Branch BQ/Ot/23 Ip
B0071SOO3S Ack receipt of BOObia interim deficiency i-opt r» broken
reactor1 vessel anchor bolts Will nvieu final rvpt upon
receipt
FIORELLI.O Region 3, Chicago. Reactor Construction b Engineering
Support Branch BO/Oi/24 Ip
B00717O3ap Act receipt of 000&19 interim deflcitncij rept re letdoun
cooler iirpporti
FIORCLLI.O Region Cl, Chicago, Reactor Conitruetlon h Ensinesrlng
Support Branch (30/07/01 Ip
BQQ7240353 Interim Part 21 rept re defective ITT actuator* In dampvrt.
Custamar notifit*tion encl Jabs claKulfled nonnuqlsar
safety-relatBd are not rHportable. Actuators vupplled for
other jobt BT e considered purchnaer responsibility
BLOAN, D E American Manning h Ventilating. Int BO/07/OB SOpp.
8007390206 Final deficlsncu rept re emergency tor* cooling Actuation
SU.B digital Subsystem E logic ctrcultry drawings DbM mill
corroct drawings by B00930 Fscilltie* will be In confornance
by aoo?30
COOK. J H Coniumeri Pouer CD 80/07/17 9pp
DOCKET SO-330 MIIH.AND PLANT, UNIT S
A Application/construction stage document* Si correspond •Tic*
BOQ7Q20J3? Diitutties D Hood 791 031 mimo r« potential for poit-LDCA flow
blockage for PUR plants caused by containment tump icreen
deficiency Assessment needed to determine wheth-er Board
notification necessary
A Assistant Dlrsctor- fo-r Light Hater Rooctors 79/11/26.
—HQ07020I67 DIRCUSS*! 791031 tolcon u/utll i>» 79-0917 trip rept of
containment, sump serein deficiency t< Bt>VI concern re
potential For post-LOCA flow blockage Review requested to
determine whether Board notification nec*»*ary.
HOPD.D Light Water Reactor* Branch A 79/10/31 Ip
B0070201D1 Requesta info from CP & OU applicants re 9A Varna 791136
memo on post-LOCA flou blockade For PUR plant*, based on
insulation type ti tump screen mssti niie Evaluation nDCB«»arv
to determine uhnther Board notification neeaK»r«
MATTBDN.R J Division of Systems Safety 79/1B/13 2pp
H0073103B6 Foruiards TR-30B7-3. "Acceptability for Sve of Midland
Reactor Pressure Vessel Anchor Studs, " Revision l.flolated
corr»iponilBnce
D . COOPER. M E, fulitnvne Engineering Berylceli SO/03/19
— -80073103B7 "Aeceptabi 1 i ty for 8vc af Midland Rvactor Prn»iur»
Anchor Btuds." Revision 1. Related correspandancB
TeUdijne Enginftering Service* TR-30B7-S Rl ND1.
175
BOO70IO397 Forwards NRC roogani lat I on chart for Ofc of Nuclear neaEtor
Regulation' effective H004S8 Considerations re activities
should bi made through assigned mgt representatl vos flreas of
disagreement may be discussed through informal appeal
TEDESCO, fi L Assistant Director fnr Licensing BO/Oi/13 2pp
BOO7070119 Forwards "Model Testing of Containment Sump ECCS
Hecirculatl on Intakes)" prepared by Western Canada Hydraulic
L*b*,Ltd,fOr Bechtel Power Co Comments an MHC 790917 trip
rept sncl
COOK. J W Consumers Power Co BO/O6/2fa lOpp
—3007070130 "Model Testing of Containment Hump ECCS Rec irculati on
Intakes, " prepared for Bochtel Power Co d util
* Western Canada Hydraulic Laborator 1 es, Ltd BO/Q4/30 9Spp
BOO7H3Q001 Forwards statement of policy re requirements to he met for
currant OL applications, aa derived Prom NUFlEO-0660 ti found
In KlWEO-0694
EJ8ENHUT.D 0 Division of Licensing 00/06/26 Sop
BOQ71BOOB1 Forwards request for addl Info re plant fill to support
required geutechnlcal engineering studies for review of
T«*pon*es to NRC 79111? request
BCHUENCER.A Liceniing Branch 3 flO/06/30 9pp
8007290701 Objects tn eiclusi
Footnote a.whiih eicopts SL
requirements Hi?nupsts recoil
BRUNNER. 0 E Consumers Pou
of pn
amends
seO amends From 10CFR170 33,
ram license fee
>r Co BO/07/2.2 3pp
— B007270707 Responds to 000403 Itr objerting to fees for 791219
application for amend to CPs Commission 79120ft orrier does
require app 1 1 catl on, theref ore. eipmp tion to 10CFR17O 32 is
not app 1 icab le
MILLER. W 0 Luense Foe Hanagement Branch 00/07/03
>P
F Security, medicnl. emergency I- fire prntection plans
8007010473 Discusses pioposod cndnflB to 1OCFF150 adding requirement for
fire protection plan at facilities foriualds comments on
ru I a. suppl omenti ng consultant comments (lues t ion?
appropriateness of rule, since rult* reopens resolved Issues
HOFFMAN. D P Consumer! Pniuer Co BO/Q6/27 Bjip
800/090393 Summary of 300611 meeting u/utiJ t< Hechtcl in Bethesda, MD
re security plans to protect against radiological sabotage
HDOD.D Licensing Branch 3 BO/06/30 4pp
<Q Ad jud icatoro correspondence
8007260060 Responds to NHC B00522 Itr requiring two actions prior to
resumption of safety-related work by Zack Co Limited uork
ihat ii pirformec) will be evaluated & if acceptance level
of confidence la attained, thon full production can resume
COOK, J. U Consumer* Power Co 80/06/30 Spp,
8Q07OHQQ51 Petition to intervene re order For CP modi all eying that mod
u(ll result in unsafe t inefficient exercise of atomic
energy u*e d uiill crente adverse environ effects
Cortif icata of Bvc encl
WILSON, a C Affiliation Untnoun (30/06/24 3pp
BOO723011i Ad vis OB that util is not etompt frpm fee requirements for
791319 application for Cf> amends Any CP emends to be issued
6g NflC are not seen as resulting from 79130A order
, 0 License Fee Management Branch QO/07/O3 Ip
BOQ7O702B3 Petition to intervene in CP mod proceed ing , al 1 egins that
unresolved soil settlement problems will create adverse
safety problems Cettlficdte of Svc pncl
MILLER, T H Affiliation Unknown HO/06/3*> 3pp
eO07Sfl0041 Submits revised facility project schedule Integrated 2-uni t
• tartup prograin retained Bept 1980 NRC Yollouhook update
traninlttal luill reflect milestone dates haeed on listed
canplfltlon dates
MILLER, D,B, Consumers Pnuer Co GO/07/O3 Ip
B007OB0039 Petition to intervene in CP mod proceeding, al 1 eging that
unresolved! eoil settlement problems uil! adversely affoct
safety f( mill cieate incf f it i i>nt eiorciee of atomic energy
UBB Quastiuns integrity of const Certificate of SVL oncl
RACE.M /i Affjliation Unknown BO/06/35 3pp
BOO71404?* Summ»ru of B00923 meeting ui/uti 1. Bochtel. ufcN
B«th»ida,MD re three ronctor vessel hold-down studs
prssarvicn failure
HOOD, D 8 Licensing Branch 3 BO/07/07 lOpp
Teletfyne in
BO07180019 For war J» juiJolinUE For seismic l> structural dEBign onalysit
audit planned an part of rovieui of OL application Info
Should be Pilled In on guideline forms prior to audit Audit
Util take five working days
BCHWENCEH.A Licensing Branch 3 BO/07/07 lB7pp
8007930307 Ll*ti drawings t, sbetchas submitted by util Paunil to bo
partl^llu, Illegible Independent confirmatory piping onalijsls
raqueited by NRC cannot he performed until bolter copies
ara abtaingd
BATES, J, O Rockuoll Internattonol Corp i Energy Systemi Div
ao/07/0? app
O00731034D Foruards Commission (300927 memornnilum f< order containing
daciiians an UC5 700502 petition for reconsideration of
730113 momoranifum !< order UCS 771104 petition tough t action
re. fire protection for electrical cables
EiaENHUT.H 0 Division of LI cenhinij BO/06/20 31fp
BOQ70B0094 Petition to intervene re order for CP moiL a 1 lag ing that
unresolved soil settlement issue uill [rente adverse safety
problems & luill result in Inefficient exorcise of atomic
en-orgy use Certificate of Svc oncl
F?EIST,H D Affiliation Unlmoun QO/Od/M 3pp
8007030592 Memornndum !< 01 dor granting NRC 00061d request to postpone
response to CPC 800S37 motion teeliiiig ronsoltdation of aoil
conditions (< plant fill mntls Issues re CL t order for
license mod proceedings
SMITH, I W rttomir Safety and Licensing Coard Panel 80^06/37 Ip
SOO7130497 Comments on proponed addl guidance on potential for lou
fracture toughness & lamellar tearing of LWR component
support structures NRC generic guidance invalidates many
support designs developed per past applicable codes t #tdn
COOK, J U Consumers Power Co HO/07/09 4pp
9007340040 Notification of OOOBOS meeting ui/utll In Dethesda, MB to
rillcusv schedules for const t< licensing review
HOOD, D 8 Licensing Branch 3 BO/07/09 4PP
8007810483 Forwards updated FHftR Pages 3 B-24 through 3 H-36a,PagB*
17 1-li through 17 l-l4b b Queatlon t< Response Pages 17 1-1
through 17 1-4 in response to NHC BOOS3S Itr M/o oncl
COOKiJ H Consumers Power Co 80/07/14 2PP
80O7300104 Notification of BQQ731 meeting ui/uti 1 & Dechtel In Bothesda,
MD to discu»s addl info on plant fill
HOOD, D. S, UUentlng Branch 3 BO/07/21 4pp
0007300261 Notification of B 007 as ft 29 meetings & plant tour u/util b
Bvchtel to assess const completion schedules Meeting agenda
& FR enrpt encl
HOOD, D, B Llcfinsing Branch 3 BO/07/21 7pp
3007390036 Notification of BQO03I open meeting ui/util in Dethetda, MD>
originally Bcheduled BOQB05. to discuss const & licensing
(••vivw ichedults
HCMJD.D S Liceniing Branch 3 BO/07/32 Bpp
DOD7O10333 ftc I" rpceipt of BQO&17 Iti re recent containment bldg
publicity Util Itr re inconsistent cross-ref erenr ing bHtuieen
BbU & Dechtel encl Further rept on icsue mil] be provided
when avaiSahle Repi Dsontation status requested
PATON, U D Hearing Branch 4 OO/06/30 Hpp
B007 1 400 1 7 Petition In opposition to ul-il motion for consolidation re
7V1S06 order modifying CPs Urges poitponenmnt of response
ti requests that activities be stopped due la deficiencies in
const (< saf etij-related Btructurea
MARSHALL. W H Mapleton Intorvenors 80/06/30 Hnp
D0070?00'13 Responne stating no present opposition to WA Thlli odeau, TB
Miller, PA Race.D Stamirls !< C Qilbert petitions to
Intervene Rpserveo rig-ht to opposu participation in future
development & urgeo consolidation Certificate of Qvc encl
MILLER, H I , FARNELL.A 8 Consumers Power Co MILLER. H I Isham.
Lincoln & Beale 80/O7/0] 3pp
SO070900SS ResponKB in support of C Gilbert B00616 petition to
intervene in CPs mod praceFdinfl Standing requirement
satisfied Ruling nn contention requirement premature
Certificate of Svc encl
PATCH. W » Hearing Branch 4 HO/07/07 ipp
76
30O7140Q3Q Response stating no present opposition to SK Warren. 3D
Hoist, GC Wilson t, Hft Ran? petitions to intervene re license
mod Resorwna right for future objection & urget
representation by sinnl-e spokesman Certificate of Svc end
MILLER, M [ . rARNELL.A B Consumers Power Co MILLER, M I Ishnm,
Lincoln I> Bcalu BO/Q7/QB fcpp
B007l7032h Response in support nf HA Thibodeau, TR Miller. QC HiUon.sD
Heist. PA RacB.B Uarren.MA Race t, B Slamlris petitions tn
Intervene rn 791206 order mollifying CPs Ruling on aduquacy
premature Certificate of Svc Pncl
PATCN,U D Mparing tlranch 1 BO/07/14 6pp
0007170232 ReEpo.nne in support of WH Marshall B00623 petition to
intervene re 77120(1 order modifying. CPs Hilling, on adequacy
prnmaturp Certificate of Bvc and
PATGN.U [> Hearing Branch 4 BO/O7/14 6pp
0007330190 Responds to Q00603 Itr re frequency of correlation strength
tost sampling on neu safety-related concrete HfiC position
reflects increased testing during periods of lou vul
placement
gCHUENCER.A Licnnalng Oranch 3 8O/07/09 3pp
8007180697 Forwards current rules of practice H/o end
PATDN, W D Hearing Branch 4 BO/07/11 lp
K Utility Final 0afaty Analysis Report (F9AR) fc amends
8007240146 Updated F8AR Pages 3 B-24 through 3 B-26B, FBAR Pages 17 1-11
through 17 l-14b & Question & Response Pages 17 1-1 through
17 1-4 to be included in F8AR, Revision 2i in msponse to NHC
800923 Itr
» Consumnrs Pouer Co 9O/07/14 Hpi-
9007220194 Fle&ponse to Maplotun Intervenes 900&30 petition Argument
re consolidation untimely Hequest to postpone NRC rosponse
to CPC motion moot So i 1 -rDlated issues are within scope of
QL proceeding I, NRC 791206 order Certificate of Svc end
MILLER. M 1 Consumero Pouar Co MILLER, M I Ishara, Lincoln d
Beale BO/O7/1S Bpp
B0071703BS Advises that HH Marshall, at MaplBton Intervenors BOOiSO
petition to AGO ahoulrt not he given consideration at
orosent stage since Intervenor not yet admitted in
prncDeding
PATON.H D Hearing Branch 4 80/07/16 l|i
B007iaoafl2 Rffspnnds to 900410 Itr urginfl NRC action to stop const Is«ue
will be submitted to ABLE uiho has proper jurisdiction over
matter in controversy Reminds of NRC position that UH
Marshall tias standing to intervene
PATDN.H D Hearing Branch 4 80/07/17 Hop
Q Inspection report*, IE Bulletins & carrespondvncB
0006300111 ForuiordB IE InHp Repts 50-337/BO-18 t, DO-330/80-13 on
900301-31 No noncompllancB noted
FIDRELLI.Q Itogion 3. Chicago. [Junctor Construction b Enginaarlng
Support Branch 90/05/14 2pp
--8006300133 IE Inop Repts 30-339/90-18 E, 30-330/00-13 an B00301-31 No
nancompllance noted Major areas inapec ted, ennm of »Jt»
conditions & detenoiuninj reactor vessel holddoun bulti
CDDH.R J , KNOP.n C fleolon 3i Chicago. Officn of the Director.
80/09/13 3pp
80072103iO Forwards IE Circular HO-13. "Grid Strap Damage in
Uestlnghouse Fuel Aiaetnbliet " No urltt*n r*«pon»a required,
HEPPLEfl.J 0 Region 3, Chicago. Office of th> Dlvactor GO/09/2B
HOQ730Q421 AdvlBss that util I, Upchtel Pouor Corp havo roachBd
aoTflemont on i-avised schedule re commercial operation nf
Units 1 d 2 Unit 2 scheduled for commercial operation in
Dec 19H3 b Unit 1 in Jul 1904
OIDDB.rl E Uham. Lincoln & Deals BO/07/S2 lp
8007270734) Order t. nutlco of BOO? 10 special prehoarlng cunference in
Midland, MI re Identification of issues, ruling upon
intervention petitions ti other related IEBUBS Public invited
to attBTid ui/o active participation
SMITH, 1 M Atumic Safety and Licencing Hoard PanBl BO/07/24 3pp.
B007S1073S Orrier denying Maploton Jntervenort' 900630 petition urginfl
ASLB not to consider CPC motion for consolidation Intervenes
maij retpand dlrectlij to <nottun
SMITH I M Atorair Safety and Licensing Baaid Panel BO/07/S4 2pp
B007290766 Memorandum t, order ruling that petitioners PA Race>B
BTamaria.SD Heist, SK Warren, TR Miller, Mfi RaCB.OC Wilson, WA
Thibadoau fc C Oilbort have satisfied, Interest ti atpect
requirement* ConForonco re QL yill he set for 800910
SMITH. I U Atomic 9nfotij and Lie DUB ing Hoard Panel 00/07/24 Spp
H Ooneral correaponifenco
aOO-71B016B OppoiSBa canst of facilities Ore at Lahes reylon uould be
deatroyad if TMl-typo accident occurrsd
* Affiliation Unknown 90/03/16 lp
6007280523 Responds to H00521 Itr requesting info re PA D'Archangel
roqunst that NRC o<nedite facility licensing Addl NtiC effort
resulting from THI-H accidsnt caused delays in licensing
Development of schedule for revieu of application undoruay
DIRCKS. W -J Office of thB Eiecutive Director for Operations
BO/07/OS Spp
— 8007860936 Raquesta responiie to encl PA D'Arcliangel Itr requesting that
NRC axpedibe facility licensing
B House of Rep 90/05/21 Hpji
fl0071i0634 R«qijBsti response to end WH Marshall Itr re Oct 1*779
requent for info about facility Roquest unaniuercit
ALBOSTA-D House o* Rap 90/07/09 Bpp
9007010144 Forwards IE Info Notice 00-33, "Lots of Buetion to Energoncu
Fettdwatar PumpB " No written response rnquirBd
HEPPLER.J 0 Region 3. Chicago, Offic* of the Dime tor, BO/03/29
in
9007320183 Forwards IE Info Notice BO-ati "Evaluation of Contractor
QA Programs " No written roRpanse requirod
KEPPLER.J 0 Region 3, Chicago, Office nf the Director, 80/06/10
lp
9007160179 Forwards IE Info Notice HO-37. "Degradation nf Hone tor
Coolant Pump Studs " No specific action or response
required
KEWLER.J 0 Region 3, Chicago, Office o'f the Director BO/06/11
IP
Q 00 7 2007 07 Forwards IE Info Notice BO -20, "Prnupt Reporting of Into tn
Accordance U/10CFR50 33<u) " No uritten response reo.uj>rttd
KEPPLER, J 0 Rcalon 3, Chicooo, Office of tha Dlrnetor OO/Ot/13
IP
B0070B030i Reapondc to IE Bulletin 00-09, "Hyriramotor Actuator
Deficiencies " Vendors evaluating which actuators yill
requirv mod or rflplaceinent Ic which uill maet spec
requirements re spring & tiling nomograph problvm
COOK. J M Consumer* Power Cn 80/06/17 Spp.
0007230402 Forwards IE Insp Repts 30-339/90-16 b 30-330/80-17 on
900401-30 Ho noncompliance noted
FIOHCLLI.O Region 1, Chicago, Reactor Conttruttlon 81 EnnlnB«rina
Support B^aneh HO/Oft/17 Spp
—9007230413 IE Insp Repts 90-329/80-16 & 30-330/80-17 on 800401-30. No
noncompliance noted. Major areas inspectod; site condition*.
reactor vessel holddoun bolts & Unit 1 reactor coolant
CDDK.R T, Region '3, Chicago. Office of th» Director HAYEB. D. H
Region 3, Chicago, Reactor Construction & Engineering Support
Branch BO/06/03 4pp
9007020362 Forwards IE Circular 80-18, "Loss oP Reactor CooUnt Pimp
Cooling & Natural Circulation Cooldoun " No written raiponnt
raquired
KEPPLCR, J 0 Region 3, Chicago, Office of the Director SO/OA/SO,
IP
— 8OD71606491 Providas list of- conditions for which info is requested ft
safeguorifs for public health d snfety Also req,ueat5
retolwt ions re cr^ct ing, deuiatering, bldg settlements b
cafsons problems. per NRC 790223 & 0305 meetings in IU
IIARBHrtLL, W H Mapleton Interveno-rs 77/09/04 Bpp
80071704i7 Forwards IE Circular 90-14. "Radioactive Contamination op
Plant Oemlnoraliied Mater Sys h Resultant Internal
Contamination of Personnel " No written response r»o.ulrad
KEPPLEHiJ 0 Region 3, Chieago, Office of the Director 8Q/Qi/24
tp
17
BO073Q0300 Formal-da IE ITIBP Repts 5O-329/BO-IS & 9O-33Q/QO-19 on
BOOS01-31 No noncowpliance noted
FIORELLI'Q Region 3- Chicago, Reactor Construction fc Engineering
Support Branch BO/Oi/26 2pp
-- HQ07300304 IE Insp HeptS 50-929/90" IB & 30-330/80-19 on B003O1-31 No
noncDinpliance noted Major dross inspected suspect pipe whip
restraint Sal tingi const activities DF Zac.li Co. dctensloning
of mac tor vessel holdown baits & audit of Peabody Testing
CCHW.R J • KNOP.R C Region 3, Chicago, Office nf the Director
eo>f'*/24 7pp
8007330330 forwards IE Bulletin BO-16. "Potential Misapplication DP
Rosowount Inc Models 1151 fc 1152 Preaaure Transmitters
W/Either A or D Output Codes " Written response required
IE Circular QQ-16 also encl No written responiie required
KEPPUER.J 0 Region 3. Chicago. Office of tho Director fiO/Oi/27
DOCKET 30-331 DUANC ARNOLD ENilPQY CENTf!?
F Security. medical. emcrgenc y !< fire pToteitiuii pl.nn
80O716O19A Forwards NHC BOO4rJ3 J tr to oil power rejictnr 1 iconaeoti, > «
response to 000559 llr re emergency roKpDiise PoeilltieB nt
reactor sites Siteh u/approval tu HBP c 1 oaoij-i. L re u 1 1
television link u/tochniral support c Ir listed
CHUTCHF1ELD, D M Operating Reattnra Branch S HO/O/CO7 Sp|>
0007070207 Advise* that t avieu of Bnfuguarda cnn I. Iny eni y plan nidlc.il.in
need for oddl moris Enc 1 HOC LomnientE withhold
<ref 10CFRB 790>
IPPDLITO.T A Operating nenttor* Dr.inth ? OO/OA/IO Jp
0 Ad jud icatory <: orresponrfonL L>
6007170625 Forward* IE Insp Repts 50-329/80-19 B, 50-330/80-16 on
BOO&02-03 No noncompl lane * noted
FIORELLl.t) Region 3, Chicago, Reactor Construction !< Engineering
Support Branch BO/06/3O Hpp
B0073t02fl3 Forujardt Conmi a 3 ion BOOS37 mH(inirflr,diiiD & urdur Cull tnln 1 ng
decisions on Uffi 7BOSOS petition fnr r DCOIIE i ilprji tl PFI uF
7H0413 memorandum S, order UCS 771104 pptition tmiight ,tttinn
ro firo protection for elc-ctrjinl cables
EISENIlUT, D 0 Division nP 1-irenBing aCVOA/a!) H'Jpp
— B007I70A39 IE Insp fiepts 30-339/80-15 J. 00-330/50-16 on B00602-OB No
noneompl lance notad Major areas inspected records & test
results of steam generator anchor bolts t< pipe restraint
bolts
VANDEL.T E , ERB, C M . NAIDU, K R Hogion 3. Chicago. Office of the
Dime tor 00/06/26 12pp
BO071ci061S Provides interim response tn IE Bulletin QO-OB re
•lamination of liner penetration melds Includes list of
nanitratlon info on joint typei fined head matl, Eleove matl d
dia«iet«r, tupe of examination perfurmed t repair Info
COOK, J W Cgnuumers PolUHr Co SO/07/11 llpp
8007310321 Ack ree»ipt af BOOt,30 1 tr informina NRC of stop
correct const problems noted in IE Inap ReptB SO -127/BO-
50-330/00-15
KEPPLER.J 0 Region 3. Chicago. Office of the Director
IP
B tafcen to
14 ti
80/07/83
— 8007310339 l-oruarda ruiponse to NRC SOOS22 1 Ir re tonat probleno noted
in IE Insp Fteptfi 50-329/00-14 t, 50-330/CO-15 Correciive
actions Zack Co QA manual tc OC control procedures uio-re
rvvieued for adnngscij h clarity
COOKiO H ConBumiirs Power Co flO/0(,/30 8pp
R Periodic operating reports & related correspondence
8007260124 Forwards Hnthtol nonconformanca repte.OA audit findinu rcpt,
sjt corrective action ropt.DSiW repts of nonconf ormity It utll
nonconform»ne» reptsi audit finding repts & corrective action
repts for June 1980
COOK, J H Cqn*lim»r» Pouor Co EtO/07/3( 360pp
a Reportabl* occurrences. LERs ft related correspondsnco
B0071iOS07 P*rt al rapt r» defective fostnner mitls Mto (• AS40
supplied bv Southern Bolt fc Faotsnir Corp far site asajimblg
(c installation of pipe uihip rcatraints Posslulij caused by
improper heat treatment or wrong matls supplied
MARBI8QN,D NP8 Industries. Inc 00/06/16 llpp
P Operating license stage document"! !c corrocpniidoric p
800723002G Summary of SO 0307 mentllig ui/Mur* I OUIIHI g ornup In llotlnmln.
MD,re rovlsinns to NRC accoptoncs Li-itorio ft uoli tsiid lug
issues relative to Mark I ccintainment long-term pros) ram
GIUMCE.c T rinnt Systems nrsncti I3O/02/21 'llpp
6007010433 RoapondB to N«C flOt!507 1 tr ro niidl TMf-^ rifqu i r ementi Tnlal
assessment of culleclivo impact not ijct c ondut toil J':*un 1 1 1 u
al tflrnut ives to roiiu'romun t fi I tic 1 tide equal nr tctlor uaPutg
mods t< exception IP unneccs nary rcroinmoridnttDitA
ROOT.L D Iowa ElBctric l.igl.t (, Power Cii Bo/Of./?,') I ji
B00723Q?33 Describon Cycle b restart touting progium It ronult* Ifpuultt
of all toils biero sotit Pac tnry Ad d I tc-atinfl priwod llial
netiily installed ret irculation puifi(> tilp moirta aypl ifolilo
criteria
MIMECK.D L Iowa Electric l.iglit tt Power Co P<t/Qf,/S.t ;i|in
60070-70142 Application to reinstate Amend iO to App A cf LIcenDe
DPR"47 Amend ui 11 allow reactor « bar tup !c *ip»rotion Pur
greator than 34-h U/OHB ro-cirr Lilii t inn loop out of KVC
Category II amend Foe encl
ROOT. L D loua ElDCtrn: 1-ight t, F'ouiir Co HO/Ofc/JU lp
BO07Je03fll CnnFirras 0006HH tetcnn auth or i ifltdoll to amend Toth HPOLB os
roijiiested in 8Q062Q opplic.it Ion Litqnnu Df*R-49 is ameniloi!
effective- 800630 by reinstating Amend 40 until (!0070t>
NOWAKjT H Asalstnnt Director Fur Operfltino noarlorD llO/O^i/.IO
2PP
FJ007O70S53 Torwarda " Ver iPicji fcion Tost of fctatlc-n [Inrtric [)1 nlrtbuLlon
Sys yoltago for Ouano Arnold Energy Cfcrt " in final rmpoiino
to NRC 790BOB HP rn Etatlon clettric d i utr Ibu I i an h\it
ROHT.L 0 Inuia tJeltrir Light S, Pouiir Co HO/O7/01 lp
— B007070H54 "Veri f it oti nn Test of Station ClDttrtc nutrtbuilnn flijii
Woltnges for Duane Arnold EhHryii Clr " Ovorniie dinulng
end
» "eclitel ABBDC lotus J'rn f essional Cnrp t]l)/(ld/:H) lApp
B007070197 Ack receipt of 800613 interim dePictency rept re eompontfnt
(tuallfUatlon test documentation re-review
FIOREUi.1'0 Region 9< Chicagn> Reactor Construction & Engltienring
Support Branch BQ/Qb/33 If
Q00715D03S Ack receipt of 00O6JH interim deficiency rept ra broten
reactor veiacl anchor bolts Mill revleiii final rept upon
racaipt
FlDHELLIifl Region 3. Chicago, ttsactor Construction t, fneinoerinu
Support Branch, 80/06/H4 lp
6007170920 Ack receipt of BOO i 1*7 Interim deficiency ri'pl re letdown
cooler supports
FIOfiELLI.O Rffglnn 3. Chicago. Reactor Con»truction i Enginetrinfl
Support Branch 80/07/01 lp
8007290304 Final deficiency rupt r» emergencij core tooling actuation
vg> digital Bubsyitem a logic i-lrcultry drouings QtiU mill
correct drawings by B00930 Fact Ji ties uilll bo In cnnfot-manct
bg 800930
CDOK.J W Consumers Power Co BO/07/17 3pp
— 0007070335 "Ginalo Uine
* Iowa Electric light
Cu
on COVHIDC 1 1 onn "
713(34 70/01^1?
BO07160624 F-oruiardii pvoposotf molts to NHC /HOH07 rvi\iio«t Par into ro
design af voltupe regnlntar BIJO of motor gaiiarator nets
which supply power to rnflcttir prntecttoii ays Imp ItimuntMl inn
will depend upiin further c ommunira tinn I< aprcernerit u/NRC
RdDT.U 0 Inud Ootlrtc Light t. Poiuer CD [3(VO//01 4pp
BO07140434 roruarilfl "Al inmate Shutdoun CftpabUllu rtnolysiB" I-,
73 overaiiB drawings in feaponne la HHC 7910U;' 1 tr fln^lynii
conclusions identical tn those tran*,-ni tteif in QOQttW Itr i»
need tor procedural & flusign mu-dB
HOOT, L D Jouu Electric l.lnhl (, P<imor -Co BO/O7/0,1) lp
— 8007140442 "Altarnotc Shutdouin Capability Analgnii "
* louia Electric Light !> Pnwpr Co 90/06/30 S3pp
— S007140450 Packagp of 73 eli>cliiral drfliuinsa to b« recnllod nb later
date of microfilming
* Oenoral Electric Co 77/04/22 lp
Appl 1 1 o ticin to reinstate Amend fiO to App A (Tech Specs) to
.cense DPR-49 re reactor startup ft operation for greater
lan 34-h L>/one recir c ulat ion loop out of svc
JDT.L 1) Iouj.1 Electric Light !. Power Co I30/O7/07 lp
QOO72202O1 Forwards IE Infn Notice HO-36, "Evaluation of Contractor
Qtt Programs " No written re*pansn required
KEPPLER, J G Region 3, Chicago. Office of the Director BO/06/10
IP
17O55H Confirms 300707 telcon author nat i on of util H007O7
(plication for change in Tech Gpsca License DPR-4? is
landed 6ij reinatatinp Amend 60 irntiJ 30O714 Documentation
11 be f DTiuard-Bd
JVrtK.T M Aseittsnt Director for Dperatingi Reactora SQ/O7/Qa
210156 Fttq.li eats payment of addl Fee in connection lu/aOOA30
plication Fur re.ictor startup }< operation greater than
-ft m/ane rec irculat i on loop out oF svc
HOB.K M License Fee Management Branch SO/07/09 tp
'22O394 Forwards "Reactor t onta) nment Local Leakage flats Testing,
'BO Dotage "
NECK. D L loua Eleitrlc Light t« Pouer Co BO/07/13 lp
8007 14031 -7 Forwards IE Dulletin BO-14, "Degradation of BUR Scran
Discharge Vol Capability " Written response ren.uir»d
HEPPLEfl.J 6 Rnglon 3. Chicago. Office of thn Director BO/Oi/13
IP
BOO7Q20719 Responds to IE Dulletin 80-O9, "Hydrasiotor Actuator
DufUienciHa " No hySranotor actuators as described by
bulletin are installed at facility
ROOT, L D louia Electric Linht I. Pouer Co HO/06/13 lp
BOO 7030037 Forwards IE Bulletin BO-15, "Possible LOBS of Energencu
Notification Sys (ENS) U/Loss of Qffsit. Power " Written
reaponss required
HEPPLER.J 0 Region 3. Chicago, Office of the Director BO/06/ IB
I073BO396 "Reactor Containment Local Leakage Hate Testing, 19BQ
Outage "
FLOYD, 5 O Bethtel Corp 30/04/22 21pp
Foruards repti "Reactor Containment Local Leakage Rate
iting, 11BD Qutaae "
NECK.D L louia Electric Light Si Pousr Co BO/Q7/19 lp
0733O484 "Reactor Containment Local Leakage Rate Testing. 1980
Outage- "
FLDVD, B D BethtsS Corf, MI NECK, D L Coniumers Poutr Co
00/07/11 21pp
310315 Forwards Amend t>\ tn Liconse DPfl-t1?.. oaf B ti| evaluation t
tlco -o P issuance tr aval lub i 1 1 tij
POL1TD.T A Operating RB.ictors Cranth 3 BO/07/1.7 Sap
aOQ72302-?i Foruards IE Insp Rtft 50-331 /BO-OS on BOO 320-22 Mo
noncompliancB notPd
HEIBHMAN,n F Region 3. Chicago, R eat tor Opnratloni Nuclaar Support
Branch BO/Oi/ia 3pp
— BO07230303 IE Imp Repb 50-331/et)-OB on BOO 920 -22 No nonconplianCB
nuted Major araai inspected Tfrch Bpec comp 1 iancoi contalnnant
vent b purge line isolation valves & follouup on outstanding
imp items
LITTLE, W 5 . URIGHT.Q C Region 3, Chicago, Office oF tho
Director 80/06/13 3pp
HO07O30576 ForuarJi IE Circular BD-13, "Loss of Reactor Coolant Punp
Cooling d Natural Circulation Cooldoun " No urltten rssponan
required
KEPPLER, J 0 Region 3, Chicago, Office of th* Dimeter 80/06/20
07310S22 Amend A I to Llcansc DPR-19, revising Tech Specs to allow
Interim operation w/ono rec irculat i on loop out oF SVC from
H 00620 -0702
IPPDLITO, T A Operating Reactors Branch 3 80/O7/17 7pp
373IO236 Safety evaluation supporting Amend 41 to Li cons* DPR-47
: Office of Nuclear Reactor Regulation, Dip actor SO/07/ 17 3pp
07310239 Notice of Issuance i ava i 1 ah J 1 ity of Amend 61 to License
)Pft -17
IPPOL1TO, T A Operating ReactnrB Branch 3 SO/O7/17 2pp
3D 04 BO Foruards check for di F f c-ren-c e betueen H cense ajne-nd class
terminations made bij utit vs if e terminal inn made by WRC,
Bigg, 00070^ Itr
1T,L D louifl EleetriL Light *, Poui«r Co BO/Q7/52 lp
B0377 Foruiartfi rcEpanse to NRC BOOIHS 1 tr re effect of dc p oviir
ipli> fa! luro -on ECCfl perfarmencH Plant design assumptions
GE analysis are ccnusrvrttlvu re facllitij
1T,L n Iowa ClRCtrit Liglit f< Pouier Co 80/07/33 IHpp
ispcction reports. IE Qull&tjns ti c-orrnBpandencB
["10533 Forwards IE Dulletin BO-L3, "CracliinB in Cflve Bprav
irgers " Written reEponse required
'PLFH. J 0 Region 3. Chicago, UFFlce of the Diroctnr BO/03/1S
1003B3 Foriuardi IE Insp R*pt 30-311/80-07 on 000324-36.0410-12 b
-2^ Ha noricamj! 11 anco noted
[BUfiNNiR F R«glon 3, (Jnicago, Reactor Operations Nuclear Support
nch BO/OSX2O 2pp
7100291 IE Insp Hept 3Q-331/BO-Q7 on S00324-afr, 0-5 1O-1H d 32-29 No
oncernpliftnc.e nolad Major areas inspected small break LDCA Si
igh (fnergij line breflfc outside ronkainment, procedures fc mods
foliouop oF IE Bulletins 79-OB, -Od- -OS & -01B
ITTLC.W 8 . CLARDV.L , CHRJBTIAMSONi W Re-aion 3. Chicago, Dffie*
/O5/IS lOpp
BOQ7 170489 Foruardi IE Circular 80-14, "Radioactive Contamination of
Plant Demlnaral lied Water figs tt Resultant Internal
Contamination of Personnel " No written response required
KEPPLCR.J 0 Region 3, Chicago, Office of th« Director, SO/ 06/24
lp,
B007O70272 Responds to IE Bulletin 30-10, "Contamination of
Nonradloac tive Sys & Resulting Potential for Unmonitortd.
Uncontrolled Re-lease of Radioactivity to Environ " Routine
lampling/ftnalyi s program has been implemented
RDDT,L D low* Electric Light & Pouer Co BO/0&/23 2pp
BOO73O0132 Forwards IE Insp Rept 30-331/80-09 OFI 800616-17 No
noncompliance noted
FIORELLI,0 Reqlon 3. Chicago, Reactor Construction & Engineering
Support Branch 6-0/06/23 2pp
— 8O0730O136. IE Insp Rent SO-331/BO-O9 on B00ol6-17 No none onpl lance
noted Major areas inspected outstanding items fc followup to
IE Bulletin 79-02, LEFU on pip* supports b concrete crachg In
Floor under torus
GALLAQHER'E J Region 3, Chicago, Office of the Director
HAVES, D M Region 3, Chicago, Reactor Construction b Engineering
Support Branch 80/06/24 4pp
8007330329 Forwards IE Bulletin 80-16, "Potential Misapplication of
Rosemount Inc Models 1151 fc 1152 Pressure Transmitter*
W/Elther A or D Output Codes " Written rsspons" required
IE Clrc-ular BO- 16 also end Ho written response required
KEPPLER, J O Region 3, Chicago. Office of the Director. 80/06/77
IP
8007160259 Responds to IE Bulletin BO-13. "Possible Lost of Emergency
Nottf ttation Sys w/Loss of Dffslte Pouer " All telephone
equipment fed power from single HflO-volt ac line
ROOT,L D loua Electric Light 8, Pouer Co 80/07/01 2pp
B0071Q0497 Notifies that time clock on Item a of IE Bulletin B0-17i
"Failure of Control Rods to Insert During acrnm at BHR. "
uill start at 12 01 AM on 00 070 B Tent should be completed
uithin 50 day* Requests notification of malfunction
KEPPLER, J.O Region 3. Chicagoj Office of the Director BO/07/O7
Notiis 90-aS, "Breakdcuin* In Con t»inl nation
on response required
o. Office op the Director 80YO5/2B
i BO— 23, "Loss df EuctJpn to Emargen
,pon»p reauired
DfPicp o-F the DJracfcor SO/05/29
B 007 E 5067 3 Forwards response to Items UBa tr 3 of IE Bulletin 80-11
Safety-related ngs in proximity to m««onrg block mails will
be surveyed & identified only if analyses indicate potential
uall failure List of subj malls encl
ROOT.L.D Iowa Electric Light *• Pomer- Co BO/O7/07 43pp.
90O723O677 Forward* re»pon»# to IE Bulletin 80-08 re examination of
containment liner penetration uoldrn Alt welds, except for
double b triple flu*d headii eiaainnd bij radiography or bif
combination of radiostraphg & liquid penetrant examination*
UDOT'L D loua Electric Light & Power Cn BO/O7/OS 3pp
6007170343 Responds to IE Bulletin BO-17 No significant amount of uator
In Btraa discharge vnl fc associated piping. Vent valves
operable fc «1« free of obstruction Result* of addl required
raviau will be reported in "ubsequont correspondenire
ROOT.L D IDUB Electric Light <• Pouer Co 00/07/09 Spp
80O75301'?? RO on BOO6I2, uur Ins uso at roactnr core inulatlrtn iDollrig
oya *o control iirattnr prnaMtre Following gltutdnuni
suppression chombor uiator lovel was i naitver tefi 1 1 <j rinlutffil to
below Tech HpoLa Cauipd bg failuru nf alarm
MIWECK.D L Ionia Clettrit Light t, Puuor f,a £10/07/14 1 p
BOO7a30'lfi4 FIO during reactor scram function* tefltlnu maud od bu IF:.
Bulletin BO-17, determined that ncrJim dlochorgo vul drain
valve CV-1067 uiou I it not soal nflniniit r.itod rurtctqr pr»a«UT*
Caus-nd bij improper valve tnutflll.tiion
KINECK.D t loua Electric LtghL !c Puidor Co PO/OT/IA Ip
8007220494 Notifie* that pe»ult« at Intirvlcv imp performed during
19SO refueling outag* b aumninru of pump l> valve op>rabllitv
tilting will bv »ubnlttid bg B00723. rflthir than 60O715, a«
previoualu icheduled
ROOT, L D loua Electric Light Ic Poiuer Co QO/07/1S Ip
BOO7S2O344 Roipandt to IE Bulletin BO-17, "Fail urn of Control Roils to
Fully Insart During Scram at BWFt " Prnliminnrg traitiinfl of
operatnr* completed Full training ulll b* completed by
BOOB03 Item 8,3 fc 6 « ulll be diicusted In subsequent Itr
ROOT.L D laun El «c trie Ligtit ti Pouar Co SO/07/17 4pp
R Periodic operating rtportc t related corrnopondvnce
B00792O3&7 Forward! monthly operating r*pt for June 17BO
HIHECK.D L Iowa Electric Light b Pouter Co 30/07/15 Ip
— 8007320371 Monthly optratlng rept fop June 1900
VANSICKEL-J IOMB El oc trie Light fc Power CD BO/07/15 &pp,
30-332 DAHNWrLU
Q In*pactlon report*, IE Dullo-tSn* !j c 01 rospunilonco
H007330020 rurwartl* IE Info Nn t It e flo-PA, "Cvaluat 1 on of Cnntrflctdr
QA PrOBram* lh Ni) written roupunee ruijuiruil
O'OEIULY.J P Ronlon 3. fttlantn. CICClcc of the Okrettor UO/W./IO
D0070ao739 Foruardii IE tlulletin 80-1 Si "CnKBlbla t.oio ut FrfBrflen* i;
Hotiflcatlon SIJB (EMS) U/Ltme ur flffnlU f'ouar " Mrittvn
raip-atiie required
0'(7EILLV,J P Rnjion 3. Atlaritn, Ufflcw uf the Dlr«tt(tr FfOXO.1,/!!!
IP
D00717012A F&r wards IE Circular- EIO-11. "Hml i oac U vo <;an t.imtn* 1 1 on nf
Plant Damlnoral 1 ie<t Wntffr BUB b (Jaujltnnt IntoriM*)
Contamination of F'ersnniHal " Mo urlttirri r^ipoii»-B ruq_ul)«iJ
D'REIILV.J P l**aion 11, Atlanta, nfflce of thir t)lr>ctnr
9 Reportable otcurrencH. LEfi« (< related corrcipondence
8007030213 Forward* LEU 80-024/03L-0
HINECKiD, L I ouo Else trie Light b Pfnilvr Co
— 60O703O217 LER BO-OS4/03L-0 on H00603, during B»rv«i I Unen ti
to-bonnet ti packing lealr dlicovered on prniiur* point
isolation valve on riattor care inolutlnn cooling turbine
it aan «upplu line.Cnuiod bg normal urear Oask»t replaced
RACER. M loua Electric Light ti Power Co BQ/0&/S6 Ip
i body-
0007310139 Reerioncfi to IF nullotin 00-13 ro oiriBru»ncu nut I f I cat, I on
failure u/iofta tit offultv power Ururnlnp pruLvnitlng*
turminatod racility in prssontlg irttlliad in DUE HAD
nctivltion Cllllotln dnoa not nppl-j
HOLDEN.n B AHiftf 0»norol Nuclenr nnrvlc«» I10/0//JO Ip
DOCKET aO-33'3 JAME0 A FfT^PATHK-K NUCLEAR F'fWfl F'LAMf
{• Bacurltu. fnedicol, om»rgirncg It tiro protection pinna
0007030324 Forward* CER BO-033/03L-0
HINECK.D L Iowa Electric Light !< Pawiir Co
--B00703023S UER SO-033/03L-0 on 000527, during aurvoillanee t««tinfl,
prftsiure t if f »r»ntial iwltchei controlllnp roactor bldg to
•uppreniion chamber vacuum break ars tripped mt aut-of-»p»c
valuaa. Caitied bu invtrunent drift Suitche* recallbr
RAOERiH loua Elactric Light it Pauer Co B0/06/2i Ip
B007030230 Forward i LER 80-oa2/O3L-0
. L loua Eloctrlc Light (. Pou»r Co
£3007070212 Toi unrd» locurltg t out I ngnni y plan !• *JJ] hiPu reqiivnte
NRC QOO320 Itr Plan t, addl InPo uillhhaliJ (ref Iflmia /SiO)
DAYNE. J P Pouvr rtuthorlt« I'P the !lt»to of Nflu Vort HO/OA/HO
O Ad judlcatorg t »rre
Ip
C007310L!43 Fpiuinrdi Comml BII I on UOOR2V nflfnoranifum {• order t nittain I "8
decisions on UC8 /OOSOS (lotitiun for rocon*! tiara tlon of
7B0413 numorjinDuni & order UCf! 771104 potllicin »ciialit action
rs firo prol*ctl'on' for eUcttlia] cable*
EIBENHUTi D 0 OlvUinn of Ulcinclng BO/04 i^MB H9n |)
— eOO7Oa0241 LEfi BO-OSS/OSL-O on SOOSaa, during normal oparjtton, tontrnl
Toon alarm indicated high/lou all level In D retire ulfltion
pu»p notor Cauiad by low oil level in louar motor blaring
Na leakage found Oil restarted to normal lavvl
RAOERiH loua Electric Light h Poiuer Co BO/QA/34 Ip
I. Flnanctil information
BC107i2fl04tI F
DAVNC. J P
rujflrla Annual Firfnriclnl ft»jgl 1V71?
Power Authorttij of the Btote of Nsu Voi-k
8007110^11 Forward* LCR 00-OH&/03L-0.
MINECKiD, L, Iowa Elactric Light * Pokier Co
— 0007300463 Annual Financial Ropt 19/J?
* Power Autharilg uf the Olnta of MBUP Varli Ht)/O7/i74 "llpp
— B007110419 LER HO-026/03L-0 on BOOAI7. on» undervoltage relay found to
have time delag during lurveillance teit Cauiod bg
Jnitrumnnt drift Flel«g recalibr li funcfcionsllv tasted
RAOER'M IOUB eiactrlt Light & Pauar Co BO/07/03 Ip
B007H047I Forward* UR OO-Oas^03L-0
L Iowa Electric Ltaht ti Pohior Co
80/07/03, Ip,
—8007110483 LER BO-025/O3L-Q on B00606, dur ing »urvei 1 lance teiting o(
•aln *team linn leak detection BIJ*I found temp tultch
TI8-447B a*tpolnt uia» SOB degrees, Cau*ed it/ Instrument
drift Invtrument recaillbr
RACER, M, loua Elactric Light b Pouir Co BO/07/03 Ip
B00722Q399 Submits special rept re ripaivB on Fire Pump IP-49 uhlch
rttultoii in pump being out of »vc longer than Toch Bpte
limit. Repair uorh mar* »ten«ive than antlclpatod when
•haft ti iplder* found to be uorn Pump rffpalred
HINECK. D L loua Electric Light ft Pouer Co BO/07/10 Bpp.
P Qp»rnting
ttage daiurnonti- !< c arrvspond D-nce
ao0723002B Bumjnanj of H00207 W
uj/Mnrk 1 Dunura flvoup In DtthftllU.
Q
B umjnanj of H00207 WBtttlnfl uj/Mnrk 1 Dunura flvou
MD.re reviiions to NHC occoptancD triturln [. aut«t»ndln
IBBU»I relative to Mark I cantainme-nt long-tarm progrnm
OniHEB, C T Plant Oy»lBfn* Drancli HO/02/H1 yipp
SOO70B0332 Forwards re«ponn«ti to NF)C 13QODOTJ mqueil for addl info re
4d»quai;y of elvctrlc d i »tr i tigti on lua valtn^e
DAYNE, J P Poui»r Authoritg of thti Htnt* of NHUI Yor* 00/07/1)1
llpp
Forward1! Amonil V) to Llienno DPJ(-3<?< <mf« tu evaluntlnn t,
notice of imuaticu h avatlabi 11 tu
lPPDt-]TFJ,TA Dpordting Reflttm-H Branch H (10/07/LI app
B007BB0341? Am and 47 to License BPFI-B9, coniUt Inn of cl,flna»» to T«ch
Bpsc» re senior opefator raspoinlh 1 Ut Us during f«fu«ltnt>
refueling durlnn Cucls
1- rBpiacom»nt op FUHI jt»iiffltli*s
1PPOLITO.T A Operating n^uctort Draneh B
HO/07/11
80/07/11
opp
»«•»£" Notic, ,,P ia^,,tc „ .lvailahiuty OF rtm&
I'dLK.P J Up urn ting Reactors "ranch 2 SO/O7/11
J7S90f,9rf Eiubmitb tuft, re effect of dc ptlti)(.r ,,„,„!,,
J.rfurnanco, in ruepgnau tn Nf!C 0(30125 Itr
foaer Authority nC bhe State oF Neu Yo
IrtVWE, J I'
miMirtn. IE [lu]]Qtin.3 I, correspondence
3pp
In
J7HOWW r»rb,.riU ]fc DulletlTi BO-13. "Crac
ipnrom d Written rosponte rBquiroil
nirn.UM HDfllun I. Philadelphia, Office of the Director
Ip
70aOl47 f-oi-wmda ir It,FnNt,tico BO-22, "Wreakd owns In Contamination
D«ilrol Programs " No written rBnponae renirir»d
!R1EH,B H OBijion 1, I'h i lfld oluli i a. Of Pice of the Director
o/Q9/i2ii
B007160733 Formards IE Circular 80-14, "Radioactive Contamination at
Plant Domineral i ntf Water Bgs ti Resultant Internal
Contamination of Personnel " No written reoponie raqulmd
ORIER-D H Rug Ion 1, Philadelphia. Office af th« Dlractor
BO/Ot/24 Ip
600721021Q Foruurda IE Info Notice 00-34. "Lou Level R«dwa«t(t Burial
Crltvrla " No uritten rBBponao required
GRIEH.D H negion 1. PhiUdelphia, Office of tho Director
BO/06/33 Ip
BQ072306fe9 Fteipondi to IE Bulletin BO-Qfi. "Engin»Bred Safety Faatura
Reset rnntrnli " Training setBionn u/licenied operators helrf
to assure awareness of potential problan re unwanted doling
of automatic deprnsiuri tati on ty* valve*
PA9TERNAK.R J Pouiar Authority of the State of N»u York 90/07/01
Spp
0007310526 Responili to IE Bulletin KO-OB r* examination af conteineent
liner penetration wsldi Liquid penvtrant Sc u>ld joints
maoiietlc particle eiaminn t ions net applicable A9ME code
PASTERNAK, r? J
4pp
Pouisr Authority of thn State of Neu Vorh BO/07/O3
TOioara rot-wwdi IF info Nuttc* uo-aa, "LoS'a af action to
eudustor Pump* " No written response required
RUsN.PH HaHiou I. I'hllndelpMft, Office of th n Director
(V05/31? Ip
0007290290 Gubmiti reply to IE Bulletin 80-10 re contamination of
nonradioactivo sy» Qanpling ti analyiing proceduroi
Implemented for sanitary waits ^yt
PASTEflNAH.R J Power Authority of the Stata of New York OO/O7/O7
Foiu,ir<li IT Inftp llopt SO -33^^ BO-OB on BOOOlv-aS No
onromp linncu- uotod
RUNNEtt.L 0 Itoglan l, PhUodnlph in, Rnactor Operations Nuclear
upport Branch BQ/tit,JQ<! Spp
007H10J39 Ih* In^p Bopt lO-naj/ElO-OH on BOO"H9-a3 Mo nuncamp 1 lanco
noted Major nroin InsiiBctcd Fuol recBipt linndl ing C insp t,
Puellnn. aclivitidt in control room R nn fmol floor
BAUMACH.M , TnnMUJSm.W IUgio.1 1. Phllorlelphia, Office of tho
Director MflTCfli.HB fteBtor. I. f'hl 1 ado I ph ia. Reflctor Qperatinni
Nuclear Sup pint Drnrnh nD/OA/O4 n^p
Q00724O323 Confirms oral notification marie an 000707 that 20-day period
for completing tests r»quired bu IE Bulletin BO-17. Itam S,
began at IS 01 AM on BOO 70S Also request! innadiate
notification of any malfunction found during tests
CRIER. D H Region 1, Philadelphia, Office of the Director
00/07/09 Spp
6007310474 Forwards responsos to IE Bulletin SO-11 Items l,2a i, 3 ro
masonry uall design Scheduled completion dates are
tentative W/n encl
PASrERNAH.R J Pouer Authority of the State of Neu York 00/07/10
uarda It Info Nutico BO -Sb, "evaluation nf Contractor
Pr a gr-am* " Ho ur i ttnn rsEpoime rdjuirDd
rCH.H II [legion i, PJj i 1 jdo I |>h I a. HPfico of the Director
Ip
/0101A4 1'iirwarila "Itunpottno to tr Bulletin 7V-OIB Fnr JA Fitipatrick
uclnHT I'uwur I'lanl "
J Puwnr rtiithofit\) of tho Htvile af New Yorli BO/06/11
5D/OIOI72 "rioBp
I'ouor Plant "
« atone fv Hobstur rng iiiuurino Cnvp »0/0b/30
to It Hullotin 77-Oin for JA Tltipatrick Nuclear
HOOpp
71001^0 (-"oriLiiirclB rnplu t-a IL Dulletln ^^-OIII re environ
ual I PicHt Inn of CJjijj 1C aquipmant U/o oncl
^SrFrJN^K.Il J Pokier Authority nf the FJtnte of Noui York
'P
roruoriln It Uull«tLn I1O-11, "Uoaradnt ion of DWR Bcram
lichnrye Vu I (-a|>ab 1 1 t tij " Uritten reaponao riquirod
inn, n H r<o«inn 1> PhlloJolphtfl. Offlft of tha Director
3/Oi/IH Ip
R Periodic operatinj) reports Si related correspondence
B007090192 Forwards monthly operating rapt for June 1900
PASTERNAK, R J Pouier Authority of tho State of New York BO/07/03
— H00709019S Monthly oporatinn rept for June 19QO
» Power Authority of the State of Neu York BO/O7/03 14pp
B Reportable occurrences. LEtts b rotated correspondence
B0070104B6 Foruisrds LER BO-O32/03L-0
PASTERNAK, R J Paiuer Authority of the State of Neu York 60/04/23
»P
— -B00701047D LEft HO-03S/03L--0 on BOQ338. dur infl refueling operations,
refuBl bridge movement to over core area did nob generate
control rod withdrawal block per Tech Spues Caused by drift
at bridge position Banning limit switch Switch adjusted
CHILD8.W V Power Authority of the Stato of Neu York 00/O6/23.
IP
720-00/1 PoruinrdB It (nap nwpt SI1-3.13/QO-IO on OOOS14 No
incamplianco nu-lad
ilH.BON. n T [(uglan 1. I'll i 1 oilel |>liln. Reactor fanntruction ti
ifltnnurin} Ouppnrt llranch RO/06/17 Hpp
30'/aauOPO IL 1n*p Hept ao-33J/BO-lO on E100U14 No tinncompliance notsd
Hajur Mfran inupactvd NHR ago cu/npononta ndilpoasc-d in
•Tacllilu raspoiino to It Uullwtln /9-OtD.
FINKF.L.A E Htfyian I, P(i 1 ladolphln. Office cf tdo Director,
i! D Ruylon 1. I'd i ladelphifl, Roactor Construction b
nDei ing Uuppmrt Rrancli ao/06/16 3pp
020717 f-oi-unrds If Bulletin no-15. "PossiblH Loss of Emergency
itiflcntJflfi 3g* U-H5) W/Lonii af OCfdllp Pau»r " Written
uponti r«q.ulr«d
1ER. U It [iBQlon 1. Phtl«no]phia, Ufflco aP the Director
V06/1U Ip
'030&HI forwards IE Circulnr RO-15, "Loss of FlB*ctor Coolant Pump
ollng t< Naturnl Circulntlun Couldnuin " No unttan response
iqu tr*d
lieil. D H FloaJon 1. Phi luile] |ilH a, Office oF tho Director
VOi/KO Ip
B007010511 I oruarifi LER BO-OS3/OaL-0
PASTERNAK, R J Pouer Authority of the State of NBW York
--8007010319 LER BO-053/03L-0 on HOOS29, durinfl normnt refufll ing, r«vieu
ravealei) that tHmporary changes to instrument maint
procedure made on 000417 had not been reviewed by PDRC
Caused by administrative error PORC reviewed changes.
CHILD9.W V Pouier Authoritu of the State of New York 30/06/39
B0070104B1 Forwards LER BO-094/OflL-O
PASTERNAK, R J Power Authority of the State of Neui York 90/06/37
— B007010483 LEH BO-OS4/04L-0 on B00330, during normal shutdown, both
recorders for gaseous release rate from reactor bldg
ventilation sys d plant process computer were out of order
during same 16-h period Caused by personnel error
» Power Authoritu of the State of New York 00/06/27 Spp
("oriuords LER BO-OH3/OI3L-0
PAllTF-IINAK.rt J Power Authority of the State of Mew York
Ip
BO/07/07
ICR 00- OTO/O3L-0 On S00i07> suryoi 1 land) revealed
inteimedjBt* ration monitor, ft i mil cat ins J SO uthen reading of
123 uas ronulrpd Coined ui| instrument drift AdjUBtmont i
eallbr r««t«r#<) instrument In operable status
CHIUffi. W v1 I'oiunr Authority of the Btntp of Ne<a Van BO/07/0?
IP
0 Ad jud i calory CorrespondEnc e
BO07310243 Forwards Commissio
decisions on DCS 700502 pet
730413 memorandum & order I
re fire protection for Electrical "t
EISENHUT.D 0 Division of licensing
P Operating license stage di
BOO? i 1 D3H3 KoiuinriH updated L EH 00-C146/03X-1
PAtJIirilNAK.ri •/ Piiwur ^«t(roriin of the State of New York
IP
BO/07/Q7
Undated Ltli EIO-O16/03X-1 on [100130. surve il lance testing
rove mod fthutitoun tool Hip permissive suitchBH set In me ess
of 73 pni|j limit Cou»ed bg procedural srrar Instruments
rocjillhr & rotiirnod to svi
CHIl.Qtl-H V Piiiuer Authority of the Stats of NEW York 8Q/Q7/O7
00071 3O/07 Foiwnrdn I.CR UO-OB6/03L-0
J Pouffr rtiitnuritij of the State of New Yorl
— •U00/t!)071f> LfcJJ £10 O,')6/O3L-0 on OOOftlO. during normal shutdown t.
Burvitt 1 lance teating, emeroBncij dii-EBl generator C tripped on
hla:h cireuliilinj) curt-lint Cnuoud by dirlg or defective
rontuct on vultapv regulator droop suite h
CHUOtl. M V PDw*r Authority of the State of New York 00/07/10
IP
(JQ07SHatH3 FurwM
PABTEHNAK.fl J
IP
d* LER 00-OBW03L-0
Pounr Authority of tlm State of New Yoi-S
00/07/33
~-ao07»0Q93* LtH 00-OS9/03U-0 on Q00703. durlna normal shutdoum
• urviii 1 Inncn- level Biultclioi (, preBBufe iridicotoT1 shouisd 13S
Ini triiM*ni» out nf ctlllir or not properly operating Caused
1>U ln*trum»nt drift Initi'iimBritu rpcnlibr Twn raplacfld
CH1L.DO. U V Powor AuthoMttf nP tfre Rtutu <if Now York 8D/07/SB
ooo72tioftio roruB
PflSTEKNftK.R J
IP
<it LER t
Power Aut/iuritu of the State of New York BO/07/3S
7904O30186 Notifnation of 790333 meetiia ""*
to discuss Facility pipe stress jnalusls si
r*-anaJi)sis, tour Facility t' su> veij stfs °lf
WieOINTdN, D Operating Reactors Brafir n ' '
IP
7904160556 Notification of 7^0325 mgt me&t>HB
STELLO.U Division of Qperatins Realtor^
«t P'
...t, 1
8007330173 "Electrical, Instrumentation & COitrpl
Spray SV, Mad. - fleaver Valley Moclear Stat tjjn.
MAYS.S E EOIO Idaho, Ine FINrt-6356
t i-r
" v .
»
60073301
(K»x<*0,'WI
8007330099 Sepsis su&roittal of propuied Tech Sp «.'
for redundancy in decay heat removal d*J"ot>» 1 ifcU * c
of operation Mode) Tecli Specs which mould provtd« «»
~ I 1
Operation Mode) Tecli Spe
resolutton end for guidance
EISENHQT, D Q Division of Ln
B0071B0191 fleeo/nmends that analysis be marie of tmp»
average dgnamic settlement on eq.uip>nent I* P*PB ^ »'
Within turbine bldg Info neeiled For review oP U*»
"Soil AnaJuEis of Toroine BUg l> Northern Yard Af .
VAUOA.S, A Operating Reactors Branch 1
3007010336
O P
mu «• *»
t. « I" 1 o
«t «t i- imnl
cm*
7010336 Forwards reaueBted feledyne TLD daia fpr -Irit **'?*' '
f 1977 8, 1st, 2nd b 3rd ljuarteri af 1976 Call fit- r *-J> t « * O r
eteorolooical tower wini! speed sensors fvi- qoaTtoi'ly » *• * *
agica
gf 79101B t. Mar 19BO also end
CONRAD, K E Duquesne Light Co
BO/O6./2&
B007010395 Foruards response to MUHEe-0578 ProccdMrc*
issued that otiliiE temp ipressuremditation Jn i-*j
room along ui/ateam tables to calculate- Bubcoollna 1"
One oversife draujng available in Central Filua only
DUNN.C N Dunuesne 1-iyht Co BO/06/3& A4pp
d u v tr I cnim)
~000?a«OA17 I (-It t!0-OaH/0.'3L-0 on OOM30, during normal shutdown
iiflerfltloriB, funttion*! t«otfl of ovoi age pnuer range monitor
ittitrument* fitund not conducted per Tach Hp»cs Caused by
CHIl-UH,H V
IP
I'ounr Authorltg of thn Qtara of Neui York 00/07/22
Fonunrda l.tli DO-097/03L-0
1'AflTIiHNAK.H J muar Authority of the fitute at New York
IP
B0072S0001 flequests submittal of application For amend t n 1
consisting OF Teth Spec thoifles i l>effnsa c antf i ti nn-ft t'Vl**
Martel Teth Specs b Model license con01t»Dfi« Pt>r TM1 -W
Lessons Learned Category A items encl Pur juidonctJ
EISENHUT.D 0 Division af Litenairag BQ/O7/QB A'^pp
B0070QOOao Formards revision to proposed Tech 9ppc tiw r I, * o r* «i
34311.4691, for NPSH /nO|J s to I on! head safety * u j *>I" *,
Ic reelrculatinn sprav pumps
DUNN.C N PuijUBsne Light Co 9D/O7/D3 ^pp
I Cfl HO-OS7/03L-0 on no06SHi during normal ihutdounmne cell
In H4Ch at volt bnltaru for dlPHel Plr-c Pump fallofl to m»»t
fflin tpBclPli. (jrftvity retiirirmient* of survolHancB test
Couaail h(J chargwr lioing out of nvc during surveillance
GHUDBiU V Power Authority of the (Hat* of NPW Vorlf BO/O7/8S
If,
00070Bo:i()J Notiflfla NUC of commitment to enroll employee who do not
nwe«»»ruim eofnnlBt* *n« portion af reactor operator e»»m
tn flccoloraUil i-eijonlif Icollon program Cue) inn a to commit
nrtplogt»« to H»m » 1 f oP WU. BOOS2B r^u»st
DAYNC.J P Pow»r Aiithovity of the StoU of New York
Opp
— B00700DD8* jJsvision to proponed Tech Spec Section* :*./*»
4621. for NPBH mods to 1 ou head Saf ettj in jfic t t iirl F.
retirculation spray pumps
» OucjueanB Light Co 80/Q5/O3 3pp
B0070a01B* forwards logic diagrams, olemeritiar ij ifra
descriptions for bypass d reset of engineered B
features, in roaponse to NRC SOO-*O^t 1 tr Di-tUjJingE
in Central Files only Item 2d info available by,
DUNN.C N Duquesne Light Co 8O/O7/O3
t 1 j»|> I <g
8007160490 Forwards uti l 0007O7 «tr re NUfiee-O37?, "r1 1> t a n t i, M t
Fracture Toughness & Lamellar Tearing tm PWR Sto^m O«<ri»i<<i t «
1 Reactor Coolant Pump Supports." as rep Jacemitn. t for i*rit|J*t»
Itr Poruarded to NRC on 90O707 W/o cncl
DUNH. C N Duquesne Light Co SO/O7/O9- Jp
DOCKET 90-334 BEAVER VALLEY POWER HTAT1DN- UMlT J
C Utility CrwlronmBntnl Report IER). omends & COT'T1**J"T1**
7V04100I»6 Hummarv of nitB visit on 790D33 w/utl 1 re pipe
«n*lVsl» & ftflOflBr revaluation effort* for Benvs-r Valley
WlW/N7"tW,0. 'tJperHting Reactors Branch 1 <Pre 770683)
4pp.
B007160353 Informs that datf uiaa inadvertentli| omiti-ud rr<
r« extension of comment period fur NUHEG-O577 R^quuniu .
date be added or original be replaced (uv'ent 1
OLWN.C N Duquesne Light Co SO/O7/O9 In
— 8007160564 Requests extension until 8OO915 for- comrnontu
ro potential foi- low fracture t-o-uglinees tt i^mollm t PJ
on PWI nteam generator t< reactnr cool aril pump i
DUNN.C N Duquosne Light Co BO/O7/O7 tp
NU1K.O
eflUBsts e<ten*iDn of eomnient porloB for
in NHC BOOSJ9 Itr is much stronger thon unginal
Extension to B0091S »houm be tLUffniciit to addr»
KJHN.C N BuqUBShe Lioht Co BtVQTVis lp
.,«««.*
.-..!;„
9064 3 Documents verbal respnnseB to NltC quuitions re station ivc
un-d &rvo 1 1 ag e relays
N,C N lluqijuiiiie Light Co HO/07/2'1 3pp
apottion rcpurts, IE Bull-ttinn It correspondence
6007230113 Forwards IE Bullotin 80-16. "Potential Misapplication of
Rosemount Inc Models 1151 & 115.2 Pressure Transmitters
H/Either A or D Output Coda* " Written response required
IE Circular BO-ltj aluo artel No written response required
ORIER.D H Region 1, Philadelphia, Office OF the Director
BO/06/37 Spp
1O2B5 Forwards IE Waato Packaging lnao Ropt 1 5000039/OO-O3 on
'«JH7-29 No nontoinp.1 saute noted
TH.G M Heuion 1, PJu loclol phia, Fuel Facility ?, Mat>rial« Safety
ncri UQ/0'1/34 Spf
7010S9I IE Waste Ppickaging Insn Ropt 1 5000Q39/BO-03 on 600327-29 Mn
one Dfnpl iaiic e notffd Major area a InQpnctud shipping paper
equlrumont*. DE1T p-lacarilins r»n,u tremnntsi radiation levolt.
amovable t oiitoml nation b eiternal package Features
EERY, U W , POTTER, J P Heglan S, Atlanta, Fuel Facilitg b
ater tals Safety Drnncli BO/OH/ 1O 7pp
•20SI6 Forwards IE Imp Rept SO-334/HU-10 on BOO-)OE)-09 No
camji 1 laric 19 nt>t«<l
LBDN. H T [is fl ID n 1, Phi ladolph la, floactor Construction lr
Irie-iring Support Ernnch HO/OU/OH Dpp
BOO7210011 AdviHfi-s of review completion in response ta IE Bulletin 8Q-
1O re radioactive aijs contamination b reuulting uncontrollod
release potential Documentation re Items 1 tc 2 rasponiiva
actions available at station
DUNN,C N Duquesno Light CD BO/O7/O1 Ip
B007230140 At k recDipt of 800610 Itr- informing NRC of itepx takan to
correct violation nottfd in IE Insp Rapt SO-33H /BQ-Qb
DRUNNEH-E J ffegion 1, Philadelphia, Reactor- Operation! Nuclaar
Support Branch OO/O7/O1 Ip
— BO 07330 150 Responds tu NRC B00521 Itr re violation noted in IE Ir\tp
fl«pt 30-334/30-06 Corroctive actions maint uork request
initiated to repair identified fire doors Closure linkage
adjusted & replaced u/heavy-dutij mechflni»ma
DUNN.C N Duquosna Light Co BO/Ot/lB 3pp
IE Inap Itopt SO-33'l /BO- 1 0 on 80C110B-O1? No noncompllanc»
oted Major areas Impacted tun £ 1 lega tluns ret electrical
gbcontrnt tor uetd rod control ti unrli practicvs
|JRFI,J P . rn-VNDLDB.f) J> Region I, PJi I lod B Iphla, Dffico of the
Irettor TIUPP.L E floqion I. Phi ladolphia, Ruactor Construction
Engineering Support Branch BQ/QS/02 ^pp,
2D11O Forward B 1C Info Notlcu BQ-33, "Breakdouna In ContBminati on
trn 1 Programs " Nu uiritton rHsponso roquii-Brt
en.D H Regtor 1, Ph i 1 adol ph in, Office of the Director
03/20 lj>
10321 ForwarJn IE Irtffl NoticP 80-33. "Los-a at Guction to fmergs
duatir Pumpi " No written lacponie required
Eft. I! H Region 1. Phi ladnlphla. Office of th» Director
OS/E9 Ip
(OS61 ["orunrds IE! Info Notice 00-36. "Evaluation of Contractor
Programs " Mt> written rnsponie required
CO. D, H ncoLon 1, Philadelphia. Office at the Director
Ip
FncunrJa IE Info Notice QO-2/, Degradation af t!»actor
i*lnt Pump Elttidn " Ho specific action or reipunw
ill red
ERi H H Hen Ion I< Phi inilsl phin. Office of tho ttlroctnr
Ub/ll Ip
3 06 tO fJnapotulD to IE Difllttin B0-03i "Vacuum Condition Rniultlng
Domape tu Chemiial Val Control Bun <CVC8) Holdup Tanki, "
•surlier relief tnnkivol control tan* 6 one primary
in tr«t!sf HT tank deBiflned for full vacuum conditions
i, C,N nuquoiRD Light Co BO/04/ 16 2pp
Foru«r<>* IE null«tln BO-IS, "PosilhJe LOB* of Emar
IflLAtion figi (CN3> W/UottB of Of P it i to Pawnr 1J Written
pon«o roqiilrsd
CRrll II Region 1, Phi 1 »del pMm Offlco of the Director
56/10 Ip
ForunrilB IE Circular flO-JS, "Loin of fie or tor Caataiit Pump
Ung t< NnturnI Cirrulotlon Cooldouu " No wrlttBn reipome
ulred
Ef!,D K Flggion 1, Phi ladolph-iu. Office af (.he Director
06/BO Ip
60&9di Foruinrdi 1C Circular SQ'Mi "Rail loac tivo Contamination of
nt DBfnlnttralliad Hater flij» * Roaultunt Int«rnal
tnmina'tlon uf Purninnul " No uritten response ranuirtd
ER. D. H nnoion IP PhlUilelphin. QffitB of tho Director
m
IOIB1 rorwflrilB IE Info Ho tun BQ-3A. "Low I.eval Hadwaate Ditriol
taria, " No written re up on so required
f«i B H RBfllon 1, Phil«d»I(ihla< Office of the Director
Ob/25 Ip
Rufer* to G006SS H-lron re review & evaluation up con-it
ieienci»s in refueling utntirr itorage lank & damlneral 1 red
ar itaragn tank Cai-recllua actions should b» takc-n to
urn ndequncij op contt of containment liner d addl tank*,
ER, D H Ftnglan 1, Phi Urtalph ia. Office of ttiu Director
06/C6 2pji
— eOO7S301B7 ForiuardB IE ITIBP Rept 3Q-334/8Q-1 1 on B00211-03O7 (, notlc«
•of violation
DDUNNEn.E J Region t, Philadelphia. Reactor aparatloni Nucl«ar
Support Branch BO-/09/21 Spp
—8007230162 Notice of violation from imp on BQO21 1-0307.
* Region I, Philadelphia, Office of the Dlrnrtor BO/03/16 Ip
— -0007330174 JE Imp Rept 30-334/GO-06 on 800211-03O7 Non compliance
noted failure to maintain fir* protection barrlar Intogr^ty.
DECKHAN, D A . HEQNEFJ-J, D Region 1, Philadelphia. Offlca of the
Director MCCAQE,E C Rogion 1. Philadelphia, Reactor Operations
Nucloar Support Branch BO/O5/li 33pp
0 0 070003 7 t Respond* to NRC BO 0402 Itr re violations noted In IE Innp
Kept DO-artfl/BO-Oa Correctlvn actions option of it at ion
superintendent to uaive Formal hiuBokaeplng touri utll be
deleted from house-keep ing procedure
DUMM, C N Duqueunn Light Co 80/07/O3 Spp
80O708Q4E4 Submits addl info ro insp t. naint nf IA b ID in«id*
roc irctilatlon epraij pumps In response to NRC requait
Includes info re modal analysis of pump column, mating face*
of pump coupling It pump <aliQnmant S&M diagram* end
DUNN, C N DutLiioine Light Co 80/07/O3 IQp p
aOO7130it3 ASviiBB that documentation In r*Kponse to IE Bullvtin BO-1O
re -contamination of nonradioac tlv» Bys,uill be available at
Facility
DUNN, C N Duq.ilosn.B Light Co BOV07/O7 tp
QOO71605'?S HotiPiB* that date uaa umitted on Itr sent H00707 r*
complBtinn nf raview of IE Bulletin BO-10
DUNN, C N Duqueine Light Co BO/O7/09 Ip
80D71AOB47 Flunuants that date DDO707 be added to ruponie to IE
Bulletin 90-11 i previously submitted u/o date Encl re»pon>e
includes date t> may replace original
DUNN.C N Duiussne Liflht Co 00/07/O7 3pp
Rviponds to IE Bulletin 60-11 ro masonry us 11 datlgn
Replaces original rflsponto u/o encl
DUNN.c; N Diiauesno Lioht Co BO/07/07 Ip
8007130183 Forwards "Final Rept IE Bullotin 79-02 Beaver Valley, Powir
Station - Unit 1 " Re-pt available in Central Files only,
DUNN, C N Uuquesne Light CD BO/07/10 Ip
BQ071803A7 Forw*rdfi final rapt in response to IE Bulletin 79~OBi "Pfpn
Support Base Plate Designs Uting Concrete Expansion Anchor
Stilt* " Itopt summarties analutlcal intp t tettlng program! It
incorporates applicable info previously lubmitted
DUNN.C N DuquBDne Light Co BO/ 07/10 ISOpp
B0072203BB Rvopondi to IE Bulletin 80-03 Flued tiiad dei-tgn for
penvtratic-n connections uVbutt ueld b&tuiBen p*n*tratlon
sleeve It proceia pipe uer-o used Lists pipe penetration*
utilising flued butt head weld const
DUNN.C N Duquesne Light Co GO/07/19 3pp
Q007170S46 Forinards "Rept for 60-Day Response to IE Bulletin 80-1 tj
MBaonrij W*lt DvaioTi, " in rtuponsB to taullvtln Items l>8a
3 Responeo available in Central Film only;
DUNN.C N Du<iumne Liflht Co BO/07/17 Ip
183
BO07230294 Foriuardn reply to IE Bulletin BO-11 re masonry wall design
W/o end
DUNN.C N Duqueane Light Co BO/O7/H4 lp
BO07290&BO Updates 790919 1 tr thot responded to 1EB-79-1B, "Temp
Effects on Level Measurement " Revision of emerfjency
procedural comploted, steam generator low-low trip setpoint
net at OX ti insulation applied bo rof leg water columns
DUNN. C N Duqueene Light Co 80/07/24 3pp
R Periodic operating reports & related correspondence
8007020S46 Forwards NPDES monthly rapt far May 19BO
MQOFIE.Q M Duquesne Light Co OO/O6/39 2pp
— 8007020347 NPDEB monthly rept for May 19HO No floui From Discharge 103
during May I960
MOORE, Q H Duqueine Light Co BO/Ofi/35 13pp
BQO71Q041B Forwards monthly operating rept for Juno 19QO
DUNN.C N Duquesne Light Co BO/07/11 Ip
— 8007160432 Monthly operating rept for June 1980
T1MKO, D R Duquesne Light Co 80/O7/11 4pp
P FttportatalB occurrences! LERs b related correspondence
80O7010376 forward* LERo GO-039/03L-0 t, BQ-O-JH/OSL-O
WERLINQ.J A Duquesne Light Co BOX 06/21 3pp
— B0070I0400 LER 80-042/031. -0 on 000619. contrac tor notified util that
river water lines grouted lo/four inch space between
adjacent bldg walls Lines could be severed during seismic
event Grouting mill be replaced la/suitable dra aoal
UCRLINB, J A Duqueane Light Co 80/06/54 Ip
— B 0070 10 156 LER BO-039/03U-0 on OOO534, u/plant in Mode 3, pouer lost to
vital- bus inverter 3. due to blown main power supply fuse
Fuse replaced b invorter returned to svc
. J A Duquesne Light Co 00/06/24 tp
BOO7140M3 PNO-l-BO-016 on 0006H5, matchman observed individual inside
protected araa Search was completed u/no suspect identified
DEVELIN.J N . MARTIN, W 0 , BRUNNER Region 1, Philadelphia, Office of
till. Director 60/06/23 Ip
a007220M)(> Forwards " Inveatijati on of Graver Records nf Field Erected
Tanks (DVC-19S) !, Fleet tDr Containment Liner (DVC-63)." aB
follouup to LGHs BO-025 (< 80-037 Rupt avallaUle In Central
BO070105H6 Foriuards LCR BO-O41/03L-0
HCRLIMO. J A Duquasne Light Co HO/06/S
Hpp
— B0070 10536 LER flO-O-JJ/OSL-O, on B00502, during tostr suppl ementary leal
caUectlon ti exhaust Fun tripped Apparently caused by loose
lead Motor lead reconilltionotf
WERLINO, J A Ouquesne Light Co SO/G6/2i Ip
OOO7070S9A HO BO-044/OIT deslon for steam generator miubbor
•mhedment found not to reflect aa-cpnstruc ted condition!
maulting in noncon&Drvatlve load a far anchors Caused by
aitumption that load was applied to normal surface
MERLINS. J A Puquosne Light Co BO/06/30 2pp
Files only
DUNN, C N Duquesne Light CD
30/07/11 2pp
0007220430 Forwards L .It 90-033/03L-O
WERL1NO.JA Duquesnff Light Co BO/07/13 2pp
— B007230434 LEO BO-033/03L-Q on B00dl7, di eael generator 1 oovornor
control motor failed Caused hy Lycling of governor uhile
attempting to shut daun diesul ui/fast start aignat still
applied Motor replaced
LrtCEV.W S Ouquesni! Light Co BO/07/1S Ip
6007350315 Forwards LERs SO-OU9/01T-0 !< 80-050/01 T-0
WERL1NQ, J A Ouquesne Light CD QO/O7/S1 2pp
— B007250324 LEU BO-049/OIT-0 on 00071B. during investigation per IE
Bulletin 79-14, determined that support nn component cooling
water supply line to 1A residual heat removal heat eichanger
has high probability (if failure during seismic event
LACEY, W S Duqueane Light CD 80/07/S1 Ip
—8007250331 LER HO-050/01T-0 nn B0071B, during investigation per IE
Bulletin 79-14i found undersued snubber was installed on
roc irculation spray line from 1A exchanger to 180 degree
spray headpr Snubbor to be replaced
LACEY, U B Duquesne Light Co BO/07/31 Ip
B0073003B3 Forwards LER BO-O3J/01T-0
WERLIN3. J A Duquesne Light Co 00/07/H4 2pp
— 3007300300 LEH aO-051/01T-0 an 300794, per IE Bulletin 79-14 review,
found significant overstrces condition would eiist during
seismic event on D 1 ou head safetij Injection pump
rscirculation line Cause unfcnnuin
LACEV.W S Duituesiie Light To BO/07/21 Ip
DOCKET 50-333 ST LUI.IE PLANT, UNIT I
F Security, madical, emergency t fire protection plani
B007010379 Foruiarda DNL fire protection review re upgrading eilsting
fira pumps, cable spreading room, fire barncri emok e
detec tors, reactor (.ool^nt pump oil collection ays !,
automatic sprinllor sye for Facility
HALL,R E Droolihaven National Laboratory BO/06/24 ipp
B0072Q0647 Advises that evacuation ti'ne estimates u-ere submitted In
B00717 Itr per 80O702 request
UHRIO.R E Florida Power J. Light Co BO/07/2S Ip
6007290634 Torwardn proposed levioion to emergency plan Appfl uill bo
forwarded under separate cover Complete Implementation will
depend on aval 1-ib 1 1 1 ty of essential resources EncJ (140
pages) available in Central Files only
UHRIG.F1 C Florida Pouer !, Light Cn BO/07/H3 Ip
0 Ad jud i tatory i ui respondenre
8007090331 Forwards LER BO-043/03L-0
HERL1NO. J A Duquesne Light Co 00/07/02
2pp
— B00709033B LER BO-043/03L-0 on B00i03- one source range channel was
lait Caused By high voltage power supply Failure Hem pouier
supply installed & tested successfully,
LACEY.W S Duituesno Light Co flO/07/02 Ip
B00731O243 Forwards CommisEion 800537 memorandum !< order containing
decisiona on UCB 7B05O2 petition for reronsidoration of
7BO413 memorandum S. order UCb 77110i1 petition sought action
re fire protection fur electrical cables
EIEENHUT.D 0 Division of Liuensini) [10/06/25 09pp
H Ooncral correspondence
QO07090310 Foriunrds LER BO-O37/01T-0
HEflUNO, J, A Oliqueane Light Co BO/07/02 app
— H00709034S LER BO-037/O1T~O on BQOhSO, one DP original radiographs made
by vandur nf reactor containment seal uelds found
eoil» rojnrtabU Cause unknouin Four rndionrapha u/
qu*ctl enable indications under evaluation
LACEY. M B Cui[iHJine Light Co 80/07/03 Ip
B0071B0317 Forwards LER BO-044/Qlt-O
HEHLINO.J A Duquosne Liflht Co BO/07/11
Hpp
--800710032H LER eO-044/OiT-O an B00630, revi etu showed existing steam
generator snilbber embedment design does not reflect ns-
eonatructed embedment condition Cause not yet determined
LACEY.W J Duquenne Lioht Co BO/C-7/11 2pp
BO071I0306 Responds to B00512 Itr re enc 1 L Bt.irr Iti concerning plant
problems Nuclear plant eafuty design approach involves use
oF multiple physical barriers to prevent release of
radioactivity to environ
D1RCKS.W J Offire of the Ciprutivc Director for Operations
00/06/30 Spp
— 9007110314 RpqUBftts response tn L Stair Iti ci'nrorning plant problemB
CHILES, L J Bunate BO/O'i/ia Ip
B007240')'l'l Ronponds to R00321 Itr re S Corbin inquiry about plant
Bafety aspeits Safety dfaign rfpprn.ich involvt>5 use nf
multiple phyaiiiJl barriers to prpvonl rcleabt' of
radioactivity to eni/iron
0!RCK9,H J Office of the Cifrutivo Oirecinr for Operations
60/07/15 9pp
184
— BQQ734Q1bB Requests response to end 5 Corbin inquiry about plant
SaPolu. asptctB
9TOriE, H len.iU OO/OD/ai Saa
M Antitrust c urroBpimdsnc e
BOO713D717 RusponeE stating 110 objection to Orlando Uttls Commission
a(106HD uithdraual of intervention FL Cities 000707 comments
re equal treatment u( 1 1 be jiddrBEsed In Unit 3 antitrust
proceeding Certificato 3vc one 1
DEWEV.L S Antitrust Division HO/Q7/I1 flpp
O Inspection rspcrta. IE Bullatini b correspondence
8007240206 Ftiruiardi IE Info Notice B0-20i "Lo*s of Declij Hoot R*Boval
Capability at DavU-DcSBB Unit 1 Mhlle in Refueling Modi "
No reiponse requirid
O'REILLY- J P Region Z, Atlanta' Office of the Director DO/03/Oa
a 00 70303 31 Foruiards IE Info Notice 80-22> "Breakdown* In Contamination
Control Pronrama " No written response required
0'HEILLY.J P Heglon 3, Atlanta, OfftcB of the Director GO/O9/3fl
P Operating licfnao atage docbmontG !i correspondence
FtaqijestB =.ubmittal of proposed Tech Spec changes providing
Pm r Edundfliic g in deraij lio.it romoval capability in oil modes
of op (ration Modol Tech <3pocs which would provide acceptable
rosolutlon one] foi guidance
EISENHUT, I) 0 Division at Licensing HO/06/11 6Hpp
BOO/1001 JP Foruordu Arnentf 33 to License- DPR-67, safety evaluation t.
nottco of luuunnce t> availability
CLARK, II A Opurallng Reactors Branch 3 GO/04/ 13 3pp
— BQ07J 00136 Amend 19 to License DPFi-67. al lowing Unit 1 to proceed from
Madw 4 to Undo H to alloui ntoam turbine driven auxiliary
foedwnltHT pump aurvoi 1 lance to be postponed
CLARK, H A Dpnt-ntlng Reactors Branch 3 00/06/13 3pp
--000/100130 fioPeti) tPValuotitm supporting Amend 33 tii Licence DPFI-67
« OfFico oP Nuclear Floactor Regulation, Director 30/06/13 2pp
— B007100M1 NntiLi) af issiianco !, availability of Amend 39 to License
DPR -67
CI.ARK.Ft A Opor.iting Reactors Hranch 3 00/06/13 Hpp
0007100161 Dummanj »F BOOfj2O meeting ui/utll !- C~E in OBthesdai MD re
QQO611 rent tor trlpi ti cuoliloun on natural Elrculation
NELSON, C C Operating Re adorn Branch 3 00/06/29 Hipp
OQ07050S2I RdiUEKtB NIJC approval of <?ncl plann to Implement B10101
raqu 1 rement* of Lonsoiis Ledrnod TSE* Force Item 2 I Q b
l.icenieo mill install Four EiPING-4 aampUm bij Q10101 to
monitor normal S< high rangu nobln gait at vent tback
UltniO.B E rim Ida Power (, Light CD UO/Od/a? 3pp
000/U0191? fldvisiiB Nile that H\IREG-Q17B rcnuiremnnt to measure chlorides
t- diinotvtrt gnuat In FiCS fill lowing atciilent Is Diceatlvj b
tnvolves urinor ijoonry porBonnol aipoinrc to raillation
Bequoit* tliat NHC reconsldur position
UIIRIO.ft T KtDriJj Power !. Light Co QO/06/27 Ip
8007330001 MmiuootB «ulirnittal of application For omnnd to license
conilBtLnii of Tuch Spue changes !i licont* candltionn PUR
(loilr) Torti Bpcts tt Model license conditions for TMI-3
LessotiB Le-urrieil C^tegarij A i tunit encl for Qutiianco
EIBEMIIUTr I) 0 Division of llcenBinfl BO/07/02: 6?pp
GQQ709O206 Forward i t-iplanatlon op a.election of undervaltagu nlnij t>
• atnaint. In respnnee to NHC OOOSHV requost for addl Info
re grill voltage DlncuBiion oF con&equenccB of spurious
actuation oF rvlnijfl also ent 1
UHRIOiH F. riorida Pounr Si LlQht Co GO/07/03 3pp
0007210330 tlunumti that rHBponso tu Item 1 of encl requeit For addl
infa ru prodablo ateHoi bubble rreateit in reactor VBGBB! on
Q0061I bo SLilimlttud ultliln ,10 daga of receipt of Itr
Runpo-nso to [turns £-!) iliuuld be aubmitbod within 60 days
.. T M AeBislunt IHrnetor For Qpernting neactorl 90/07/00
Advticn uf NRC rBorjani i ntlon an QOQ43Q which roiulted In
number at chKinflBs In oCc t ( t les, p»»l tlons d assignments of
pnrionno) Mao Mjhmlta Info fur GCTH
i T M A»5ltbdiit Otrottor for Operating HeaLtors 00/07/00
0007210458 Forward* IE Circular 80-13. "Or-id Strap Dimagi in
MeGtinghouse Fuel Asaenbliss " No written responie required
O'REILLY.J P Begion S, Atlanta. Office of the Director BO/OS/2B
»P
0007010206 Forwards IE Info Notice BO -23, "Lots of Suction to En«rgonc«
Feedwater Pumps " No written recponle required
O'FIEILLY.J P RHgion 2, Atlanta, Office of the Director BO/03/29
IP
B00710Q057 Forwards IE Insp Kept 30-333/80-13 on H00429-030B No
noncomp 1 lance noted
LEWIS, R C Region E. Atlanta. Reactor Opnrattonf Nuclear Support
Branch RO/09/29 2pp
~B0071000dl IE Insp Rent SO 335/BO-1H on 800429-OBOB No nonCDHpl tnnco
noted Major areas inspeceted pipe support t reitraint syi
including surveillance & test results
UPRIGHT, C M Region 2, Atlanta, Reactor Operation* Nuclear Support
Branch JOHNSON, A H Hegion 2, Atlanta, Office of the Director
00/09/59 4pp
6007020321 "Environ Qualification of Electrical Equipment in Harsh
Environ Which Is Required for Accident Mitigation/
Monitoring "
* Florida Payer & Light Co BO/0&/01 HOpp
--BQQ702Q326 "flalnt Lucle Unit 1 NfiC IE Bulletin 79-OIB,PhaiB 1," matter
list b component evaluation sheets
» Etifltco asrvlces, Inc Uubs of Enserch Corp J BO/Oi/01
100 pp
B0072200fc2 Foro-drds IE Info Notice BQ-26, "Evaluation of Contractor
QA Programs " No written response required.
O'REILLY, J P Hegion 2, Atlanta, Office of the Director BO/O6/10
2pp
B007160265 Forwards IE Info Notice 00-27. Degradation of Reactor
Coolant Pump atuds " No specific action OP response
required
O'REILLY.J P Rejion B, Atlanta, Office of the Director BO/06/11
HOO7Q207S2 Forward* IE Bulletin BO-13. "Possible Loss of Emergency
Notification Sys (CN3) M/Loss of Offsite Power " Mrlttan
reaponse required
O'REILLY.J P Region 3, Atlanta, Office of the Director BQ/O6/1B
IP
B0071101O2 Forwards IE Insp Rept 30-333/80-16 on B00603-03 No
noncomp 1 iance noted
KENNA.W B Region 3, Atlanta. Safeguards Branch BO/Oi/17 Ip
— G007110I11 IE Insp Rspt 50-333/00-16 on B00i03-03 No noncoaplianca
noted Major areas inspected security It health phgtic*
control Details withheld tref 10CFRS 790)
TPQIN.H J • TILLMAN.A Flefllon 2. Atlanta, Office of the Director,
QILLEBPIE.F P ReniDn 2, Atlanta. Safeguard* Branch BO/OA/1B
IP
0007290369 Forwards 1C Investigation Rept DO-333/80-1S on BQ0410-OS14
No noncompllance noted
LONQ.F J Region H. Atlanta. Office of the Director 80/06/19
2pp
H007aa037fl Auvtncs thai linnry Pratl Co torque d stross annluses rn
containme-nl purge have boon delayed Upon complatlon d
receipt oF nnolij»oE. uti 1 will review!, prepare response
demonstrating vulvt iibtUtg to cluse during DDA-LOCA
E Florida Pouor & Light Co (30/07/15 Ip
— 8007290380 IE Investigation Hept 3Q-333/BO-13 on 800410-0514, No
noncnmpliance noted Major areas Investigated' allegations re
ASME code requirnments for valves ti installation of
containment penetrations
LDNO.r J . MAF?BK.fl J Region 2. Atlanta, Office of the Director.
HERDT.rt fi Region 3, Atlanta, Reactor Con»tructlon d Enoinetrino
Support Branch BO/06/19 lOpp
18
B007O2O194 Forward! IE Circular 80-13, "Loss of Reactor Coolant Pump
Coaling I> Natural Circulation Cooldoun " No written response
required
O'REILLV.JP Region 3, Atlanta. Office of the Director BOVO6/30
--8007160BI7 Forwards IE Insp Hept 5O-333/aO-14 on COO43O-0503 t. notice
of violation
LEWIS, R C Region 2, fltlrHita, Reactor Operations Nutlear Support
Branch BO/OS/ 16 Spp
B007JOOO2I Responds to IE Bulletin 80-OA, "Engineered Safety Feature
Reaat Controlt " Sg s Identified ai returning to normal
potition after resut Safetg Injection tank isolation & chc-ck
valvn leak-off valves returned to normal position
UHRIQ, R E Florida Power b Light Co 00/06/2O 3pp
BO0707OO77 Ack receipt of BOOAH Itr informing MF1C oP ttapj taken to
correct violation* noted in IE Insp Rept 50-333/BO-10
HUHPHV. C E Region 3, Atlanta. Reactor Construction b Engineering
Support Branch BO/06/S4 lp
—0007070100 Respond* to WRC 8O0913 Itr re violations noted in IE Insp
Rept 50-335/00- 1O Corrective action! eiaminer passed eye
• lan fc schedule for recerti Pilation oF vulon tests
established
UHRIO.R E Florida Pouer t< Light Co BO/06/11 2pp
--H007Q7O102 Forwards IE Insp Rept 50-333/BO-10 on 200408-11 (•
notice of violation
MURPHY, C E Region S. Atlanta. Reactor Construction b Engineering
Support Branch BO/OS/12 2pp
— aOQ71iOB2i Notice o f violation from insp on B00430-0'5Q2
* Region S. Atlanta, Office gf the Director EQ/Q5/16 lp
-~BOO7JiOB30 IE Insp Rapt 30-3:t5/BO-J4 on OO043O-05O2 Noncomp 1 1 ancn
noted failure to rcpt emergency dies-el generator load
snquenci? timers that did not inept Te-ch Specs during routine
aurvoi 1 lance testing
MEBSITT.H R Region 3, Atlanta. Office of the Director
UPniGHT'-C M Region 2, Atlanta. Reactor Operations Nuclear Support
Branch BO/O'i/l«b 5pp.
BOO725Q3I2 Forwards response to IE Bulletin BO-OB. "Eiam of Containment
Liner Penetration Welds " Cnnta inment bnundary butt uralds
identified rioJil melds ucre in a do during const Shop welds
IIIDTV made bi] ptrnctratlon asECmli lij Fabricator
UHRIC.R E Florida Pouier & Light Co BO/O7/08 12pp
BD07E50272 Respanda to IE Bulletin 30-1O, "Contaminatann of
Nonradioact i ve Ey^ & Resulting Potential For Unmoni toTed.
Uncontrolled RaJease of Radiiiac liu i ty tn Environ " Mo addl
routiiiB aampllng or muni tor ing programs are required
UHRIO.R E Florida Pouier b Lisht Co 90/07/09 lp
—8007070103 Notice of violation from map on 800400-11
* Region 3, Atlanta, Office of the Director 90/04/30 lp
— Q0070701O7 IE Insp Rrpl 30-333/00-10 on B0040B-I1 Noncompliance noted
•laminar failed to mint eye si am requirements
HERDTi A R Region 3, Atlanta. Ji •actor Construction & Engineering
Bupport Branch CfiOWELV, B R Region 2. Atlanta, Office of the
Dine tor 00/04/30 Spp
B007170109 Forward! IE Circular BO-14, "fiad ioaitl ve Contanlnatlnn of
Plant Danlneralitad Mater SIJB tc Resultant Internal
Cont»iiiin»tion of Personnel " No written response required
O'REILLY, J P Region 2, Atlanta, Office of the Director 80/OA/24
EKM7220059 Act receipt of 800612 itr informing NRC of steps taken to
cornet violation* noted in IE Imp Flept 30-333/00-07
LEHIB,R C Region 2, Atlanta. Redctor Operation* Nuclear Support
Branch 80/06/27 lp
~ 0007220069 Desponds to NRC 8005 IB Itr re violations noted in IE Insp
Rtpt 30-335/BO-07 Corrective actions procedures will be
changed to require signatures for disconnected lead &
t««por«rv jumper 1 05 reviews
UHRID.R E Florida Power & Light Co BO/06/13 3pp
-~B007Sa0078 Forwards IE Insp Rept 50-339/BO-O7 on B00419-1B fc notitB of
violation
LCHIS, n C Region Si Atlanta, Reactor Operations Nuclear Support
Branch BO/O5/1& 2pp
— 0007230079 Notice of violation Prom insp on 000413-IB
* Rejion 3, Atlanta, Reactor Operations Nuclear Support Branch
BO/05/13 lp
— 8007H300BB IE Insp Rept 30-333/BO-07 an 800413-10 Nnncomp 11 anc 5
noted disconnected lead & temporary jumper log not reviewed
by operations superintendent prior to refueling t> response
to joint util mgt audit not received within 30 daijB
UPRIGHT, C M , RUHLHAN, U A , DELIBLE. 0 A Region 3, Atlanta, Office
of thB Director BO/05/19 19pp
B007230243 Foriuards IE Bulletin BO-16, "Potential Misapplication of
Rosemount Inc Models 1151 & USE? Pressure Transmitters
H/Either A or D Output Codes " Written response required
IE Circular 00-16 also encl No written response required
O'HEILLY.J P Region B- Atlanta, Office of the Director flO/Od/27
lp
B007160777 Ac k receipt of BOOM 2 Itr informing WC of steps tjiken to
correct violation noted in IE Insp Rept 3O-33S/80-14
LEMIB.R C Fteaion 3, Atlanta, Reactor Operations Nuclear Support
•Y«l»eh 80/06/30 lp
— BOO7I4O81Q Responds to NflC BOO316 Itr re violation noted In IE Inse
flept SO-33S/BO-14 Corrective actions LER being prepared to
report results of integrated test of engineered safety
features
UHFUC, R E Florida Pnutr b Light Co BO/O6/I2 2ap
B00733O379 Responds to IE Bulletin BO- 11. "Masonry Hall Design " Info
Is incomplete due to 1 dent i f it (itiuit work still in progress
Safety-related malls have been identified & evaluation
program developed Rept uiill bf provided by B00733
UHRIfl.n E Florida I'oiaet !- Light Co BO/07/lfa lp
R Penoilic op-ernting reports. f< relat&d c orreBpondence
B0070BO330 Forward* "Semi annual Radioactive Effluent Ftolease Rept for
Jul-Dec 197H "
UHFIIG.R E Florida Puuer i LJgnt Ca 77/O3/OI lo
— 8 00703033? "Semiannual Radioactive Effluent Release Rept for
Jul-Dec 1976 "
* Florida Power !. Light Co 77/03/01 S7PP
B Heportable otc urr pnces. LERs ti related t orresp ondeoce
B00701O4B3 Fnriuarda LEW ao-OSa/OllL-O
SCHMIDT, A D Florida POUJC-I !, Light Co
BO/Oi/W lp
— 8007D1049I LED BO-Qr!2/03L-O on 60052O, d ig i tal data pracesslng
mal f unct i ancd during poutr operation Caused bg- computer
proflraming error Sija ropaned !< returned to svc Pro^gi-am
ijji 1 1 be revi-spd to correct aoftumr-p problem
BCHDPPMAN.H A Tloflda Pui^er !, Light Co BQ/Oi/20 lp
B007OE3OSe4 ro
SCHMIDT. A D
ards LEFI BO-029/O1T-0
Florida Pfluier t, Light To HO/06/^3 lp
— B007QH029O 4,EH BO-OS9/01T-0 on 800611, at 1OOX p Diner, ground occurred in
(ircuit of valve I-IVC-14-6 causing valve to fall c 1 o s Bit
Caused by itr am con-dens 1 ng on vulvc solenoid u/moisture
invading tffrminis] bnt Solenoid b terminal board replaced
SCHDPPHAN.M rt Florida Power t, Lighb Co 00/Qi/23 Spp
B00714O3Q2 Foruards- LER aO-03&/O3L-0
SCHMIDT, A 1> Florida Power !, Light Co HO/06/29 lp
— a00714O3B9 LEH BO-OE<b/03L-0 on BOOSflO. during normal power operations.
noted that 31-ddij Pire station inepi required by Tech 9nec
had been ticuiidpd Caused b<j persannel inadvet tont Juj
overloollng insp
BCHDPPMAIN- M A Florld.i Pnupt !. Liglit Cn BO/06/29 lp
B00714Q3o4 Forwards LER HO-
SCHMIDT,/) 0 Florid*! POUPT !. Light Co
— B007140373 LER BO-O2B/Q3t -O on 800531. Jui ing normal operations, channel
A of IA steam generator 1 uui pressure trip failed Cauaod bij
failure of (muier supply associated uy channel A Vendor
contacted & noui piouer Eupjily installed ^ tested
BCHOPF'MAN. H A Florida Powtr & Light Co BO/06/30 lp
S007150627 rnruiards LER BO-03O/01L-0
SCHMIBT.A D Florida Power & Light Co 80/07/03 IP
186
-Ht>Q7ISGA3fc LER BO-030/03L-0 on 800603. during full power operation. CRT
rod position display ImetraitopE) mas briefly de-ensrg lied
to permit replacement oF Falling power supply Control
element assembly black circuit also disabled
SCHDPPrJAN, M A Florida Power I, Light Co 90/07/03 lp
HO 0703 03ft 2 Requests response to encl questions re furl design &
calculations to complete review of basic safety rept
supporting Cycle 4 reload Requests that addl info DB
provided fag B 00630 to meet review schedule
CLARK.R A Operating Reactors Branch 3 BO/Q6/BO 3pp
1007150333 Forwards LER BG-Oa3/O9X~i
SCHMIDT, A D FJorida pouifir t. Light
BO/07/07
IP
-BG07I50336 LER BO-D25/09X-1 on SQ0513, during planned secondary plant
shutdown Fur turbine maint, main steam header uould not
iSepresauri i e Full owing steam stop closure Cause unknown
Valve stems were replaced & verified operable
SCHOPPMAN.M A Florida POUBT I. Light Co 90/07/07 2pp
IDCKET 50-336 MILLSTONE NUCLFAR FOWEFI STATION, UNIT 2
Security, medical, emergency 4r fire protection plans
I0071BO19A Forwards MUG 9O0423 1 tr to all power reactor licensees, in
response to B00529 1 tr r* emergency response facilities at
reactor sites Sites u/approvaJ to use c losorf-c Ircuit
television- link u/technical support ctr listed
CHUTCHFIELD. D M OjiBi-atlrs Reactors Branch 5 BO/07/07 3ff
007O1O337 Comments on proposed rule 1OCFRSO regulation for fire
protection eKte&slvely specific t unjusti f lably restrictive
SUBBested revisions to. App R u/ justl f Ications end
COUNBIL.W B Northeast Nuclear Energy Co (subs of Northeast
Utilities) COUN9IL,U Q Connecticut Yankee Atomic Power Co
CQUNSIUU £ Northeast Utilities 80/06/16 31pp
007030336 Comment i on proposed rule IOCFR90 requirements far exceed
those necessary to resolve generic issues b are eicessivBly
specific t, restrictive Forwards alternative App R
ft re protection program
CQUNEIL, H 0 Connecticut Yankee Atomic Power Co CQUNSIL.W 0
Northeast Nuclear Energy Co (subs nf Northeast Utilities)
BO/06/1& 16pp
B007020369 Clarifies BOO306 responae to NfiC 791030 request for info
concerning Lessons Learned Task Force Item 2 1 B a, inproved
post-accident sampling capability Info en*ure« accurate MRC
understanding of design philosophy ti Intent
COUNSIL, W 0 Connecticut Yankee Atomic Pouer Co CDUNBILi M 0
Northeast Nuclear Energy Co (tubs of Morthiaat Utilltl*!)
BO/06/23 3pp
B007110341 Foiuards request for addl info re Adequacy of station
electric distribution sys voltages, per riviiu of 791 115
submittal Response requested within &0 dayl
NOVAK- T M Assistant Director for Licensing 00/06/25 9pp
8007 OQ 01 64 Application to amend License DPR-6S- coniistinfl of proposal)
revisions to Tech Specs re containment electrical
penetrations Procedure for fuel handling accident inside
containment encl
COUNBILiW 0 Northeast Nuclear Energy Co (tub* of Northeait
Utilities) BO/06/36 &pp
— BO 0700 01 69 Proposed revisions to Tech Spec* 394&494re
containment electrical penetrations
* Northeast Nuclear Energy Co (subs of Northeast Utilities)
flO/06/06 Spp
— B0070B0176 Proceilure for fuel handlino accident inside containment
* Northeast Nuclear Enerpy Co Uubi of Northeast Utilltia»)
77/OA/OB flpp
Q007030DS7 Foruiarris "RC3 Asymmetric Loads evaluation Program- " final
rept in response to NRC 7B01B3 Itr to PHR licensees re
asymmetric LOCA loads C-E affidavit for uii thnold ing encl
Proprietary version of App A withheld (ref 10CFI1B 790)
LUNDvALLiA E C-E Operating Plants Humors flroup BO/06/30 2pp
D0709OB31 Forynrils responEES to NUnEQ-0654 criteria b facilities
emergHncy plans per NflC BOOS13 t. 791O10 Itrs Encls available
in Control Fllee only EiriergEncu plans withheld (rof
10CFRB 790)
CQUNSIL, WO Connect! cirt Yankee Atomic Pow«l- Co CDUNSIL.H, 0
Northeast Nuclear Energy Co (nubs of Northeast Utilltlei)
Spp
J07170129 Confirms jiosition discussed in 800624 telcon re safeguards
c ont ing »ncy plans NRC renueated revisions are ill-advised t
unnecessary 'Specifics of plan implementation can be
detailed in procedures
COUNBIL-W Q Connecticut Yankoe Atomic Poyer CD CQUNBIL.H 0
Northea&t Nuclear Energy Co (subs of Northeast Utilities)
BO/07/01 3flp
Ail juditatory correspondenco
>07310343 FoFuarda Commission BOO 337 memorandum Cc order containing
declelong on UCB 7B03O2 petition for reconsideration of
7BD41G nenorandujin !< order UCB 771104 petition sought action
re fire protection for electrical cables
EltiENHUT.D & nivisian of Licensing BO/06/85 B7pp
F inane 1 » 1 information
107150632 Formarrts 1<JBO cash fHiui estimates for CT Lioht !< Power Co,
Hartford Elective Light Co t- Ucslem MA electric CD Cash
flows are a J equate to meet potential premium requirements
for 1975 araentffl to Price-Anderion Act
D'CDNNOR.L A Northeast Utilities BO/07/03 2pp
Operating licence stage dDcumprtb S< correspondent
— BOD7020574 "F1CS Asymmetric Loads Evaluation Program. " final repti
Vol I
* C-E Power Systems BO/06/30 ZOpp
—3007020591 "HC6 Asymmetric Loads Evaluation Programj " final rept.
Vol 2
» C-E Pouer Bystemi BO/O6/3O 300pp
— 80O702D9QB "F1CS Asymmotrlc Loads Evaluation Program." final rvpt.Vol
3
* C-E Pouer Systems 00/06/30 GOOpp
—B007020993 "RCS ftsymmetrie Loads Evaluation Program," final rept, App A.
numerical results, evaluation of C-E fuel Non proprietary
version App B. Palisades fuel analyst B, encl
» C-E Pouter Systems 80/06/30 26pp
—8007020600 "RCS Asymmetric Loads Evaluation Program, " App E, ECCB
analysis approach u/reduced area coolant channels in
peripheral assemb 1 IBS, Final r>pt
* C-E Pouier Systems 80/06/30 9pp
S0072S0001 Requests aubmittal of application for amend to license
consisting of Tech Spec changes fc license conditions PUR
Model Tech Specs fc Modal license conditions for TMI-2
Lessons Learned Category A items encl for guidance
EIBGNHUT. D 0 Diviuion of Licensing BO/O7/02 t9pp
8007100300 Forwards response to NRC BOOOS07 requests for addl info
re propsed revisions to ETB State of CT Dept Environ
Protection BOOAU Itr approving Thermal Plgme Study Rept
encl
COUNSIL, W O Northeast Utilities BO/07/03 27pp
107230099 Requests submittal of propnaea Tech Spec changes providing
Far redundancy in deraif heat removal capability in all modes
of operation Model Tech Bp«rs uihirh would provide acceptable
reB-oluticn onrl for girldante
D (5 Division of Licensing BO/Oi/11 6Spp
07140027 Summary if 600604 mEplJ"9 ui/irtiJ in Dethosde.MD r« Cycle A
reload at Facility w/Westlnghousp funl List of attendees !i
agnnda smcl
CQNNERS.E L Ofiffrating Reactui a Dranch 3 HO/OA/16 3pp
B007140344 Forwards addl Info re fuel design & physics calculations
per HA Clark G00620 request Response to Question 10 withheld
(ref 10CFR3 790)
COUN91L.W Q Northeast Utilities, BO/07/07 Mpp
B007240350 Advises nf NRC reorgant lation on 3004 2 B uhlch reiultod in
number of changes in ofc titles, positions l( assignments of
personnel Also submits info for OETR
NQvAK.T M Assistant Director for Qperatinn Reactor* BO/07/OB
187
B00721O23S Application far amend to License DPR-i3, revising Tech Spec
door numbers in Table 3 1-1 It position of certain doors In
auilliaru bldg during fuel movement in spent fuel area or
crane operation over spent fuel pool
CQtfNfllUH 0 . FEE, H F Northeast Nuclear Energy Co (sobs of
Northeast Utilities) SO/07/ 10 3pp
— 8007210243 Propound revision* to Tech Specs Table 3 9-1 reviling door
nuabors fc position of certain doors in auiiliary bldg during
fuel wovement in fuel storage areaa or crane operation ov*r
spent fuel pool
» Northeast Nuclear Energy Co (subs of Northeast Utilities)
BQ/Q7/31 3pp
8007820497 Application for amend to License* DPR -21 j, DPfi-63 to
incorporate changes to Tech Specs re organ! lational title
Class I Pee vncl
CDUNeiL.H, 0 . FEE, W F Northeast Nuclear Energy CD Cxub* of
NortheaBt Utilities) 80/07/14 3pp
— BO072Z0467 Proposed revised Inch 9puc». Incorporating organ! lational
title changes
o Northeast Nuclear Energy Co (tubs of Northeast Utilities)
BO/Q7/14 lOpp
B00731Q,}4>1 Forwards IE Insp Repts 50-245/90-07 J< 50-336/80-05 on
800301-31 No noncomplianco noted
BRUNNEft.E J Region 1. Philadelphia. Reactor Operations Nuclear
Support Branch BO/06/19 2pp
— B00731036S IE Imp RoptS 50-24!j/QO-07 f« 50-D3A/BO-09 on BOOS01-31 No
noncamji Hence noted Major aro&s inspected control rooms &
accessible portions of Unit I redt tor. turbino. raduiaste. gas
turbine generator t intake bldgs
SHEDLOSKY. J T , ZIMMERMAN, R P Region I, PMi lailelpfi ia> Office of
the Director KEIM1Q.R R Region 1, Ph i lade Iph la. Reactor
Operations Nuclear Support Branch SO/Oi/19 9pp
B007Q2O<m Forwards IE Circular 80-19. "Loss at Reactor Coolant Cump
Cooling & Natural Circulation Cooldtium " No written response
required
GRICR.B H Region 1, Philadelphia. Office of the Director
80/04/30 Ip
B00716O714 Forwards IE Circular 00-14. "Radioactive Contamination of
Plant Demineral i led Water Sys & Rosultant Internal
Contamination of Personnel " No written response runmrerf
8RIER.D H Region 1, Philadelphia, Office of the Director
BO/06/24 Ip
DQ07290300 Application to amend Licenses DPR -21 b DPR-63. clarlf uino.
Tach Spec* to reflect recant organliational title changes
License f«« transmitted 800711 Affidavit end
CGUMSIL.H 0 Northe»*t Nuclear Energy Co (subs of Northeast
UtlHlia«) 80/07/18, 2pp
— -B007230303 Proposal revision* to ETHiPagas S 1-S ft 9 1-5, reflecting
recant DryaniiaLiorial title changec
» Northoast Nurlear Energy Co (subs of Northeast Utilities)
00/07/13 3pp
80073804.73 Requaiti »i ten lion of comment period rtt MURE&-0977.
"Potential for Lou Fracture Toughness tt Lamnllar Tearing on
PWfl Qteam Oenerator *H Reactor Coolant Pump Supports," until
800913,
CQUNSIL.H 0 Nortlitast Utilities BO/07/21 Spp
Q Inspection report*! IE Bulletins t* correspondenca
BOO 7020 146 Foruardi IE Irtfn Notice 60-22. "Breakdouna In Contamination
Control Programs " No written response renuirei)
DRIER.B H Region 1. Philadelphia. Office of the Director
Bo/os/aa IP
80O701O312 Forwards IE Info Notice BO -23, "Loan of Suction to Emoffloncij
FeadiiintBr Pumps, " No written rsaponao rmiutred
BRIER, B H Raglon 1- Philadelphia, Office of the Director
BO/09/29, Ip
BQ07D20039 Advises that full roBpnnse to IE Bulletin 80-12. "Due ay Heat
Removal 6ys Operabilitu, " uiill be submitted by 600701 Delay
tlBCBRsitatitd by current heavy demand on operations
personnel
COUNBILiW 0 Northeast Nuclear Energy Co (subs oP Northeast
UtUitUn) QO/Ofi/04 2pp
B0072102O7 Foruiai-ds IE Info Nollco 30-34. "Luu Level RaduaBte Burial
Criteria " No lurlttan rosponse renuired
ORIER.O H Region 1. Philadelphia, Office of the Director
QO/06/23 Ip
B007230H4 Forwards IE Bulletin BO- 16, "Potential Misapplication of
Rosemount Inc Models 1181 f( 11*53 Pressure TrHnomi tters
U/Etthnr A or D Output Codes " Urittun i Hsponae required
IE Circular Q0~li also oncl Nn written responiO require!)
QR1ER, I) H Rogion 1, Phi 1 ado Iphia, (IPficc- of the Director
BO/06/37 2pp
R Periodic operatinB reports ti related con usponjence
H007210374 Forwards monthly operating rept fur June 1980
MfiOCZKA.E J Northeast Nurlear Energy Co (nuts of Nnrthoast
Utilities) BO/07/11 Ip
—0007210375 Monthly operating rspt for Uune 1?BO
HOWLETT, Q hi Northeast Nutluar Enoryy Co (subs of Northoast
Utilities) BO/07/02 3pp
H fleportablo occurrt-ntos. LFRfl !, roliitdd correspordancE
B00923O13I PNd-J-BD-071 on BU0309. signi f leant number of security for
personnel, contracted from Interstate Security Svcs. Inc. began
taking leave at start of mid-shift Security supervisors
working 12-h uhlft; ulll maintilin full coverage
ZIMMERMAN, H P . KEIH10.K R . DEVLIN, J U Region 1, Philadelphia,
Office of the Director BO/09/05 Ip
B007010445 Forwords updated LEO 00-01 1/03L-P
MROCZKA.E J Northeast Nuclear Enoi gy Co (subs of Northeast
Utilities) BO/06/24 lp
0007210390 Forwards IE Info Notice 80-HA. "Evaluation of Contractor
OA Programs " No written respon*» retired
ORIEH, B It Region 1. Philadelphia. Office of the Director
SO/O6/10 Ip
8007160337 Forwards IE Info Notice BO-27. "Deoradation op Heoctor
CoaUnt Pump Btudi " No specific action or reaponse
req.ui.rad
ORIEB,fl,H Roglon 1. Philadelphia, Office of the Director
Ip.
— -B007010iaO Updated LER 80 -01 1 /03L-2 on 600311, Fol louinij two plant trips
tt shutdown, dadd le clamp tiults for tiuo hangars uiere found
broken Doth hungers are hyrftdulic anuBburfi Failures causeil
fay coMbination of F.itigue t< high impact loading
CLEMENT, C Northeast Nucloar Energy Co (subs nf Northeast
Utilities) BO/Oh/24 2pp
B007070310 Forwords revised LER dO-OIB/OlX-1
MnoCIHAi E J Northeaal Nuclear Energy Co (cubl
Utilities) BO/06/S7 Ip
of Nortneast
B0071703HO H«»pontts to IE Bullptln BO-06, "Enginaered Safety Feature
(E8F) Reset Control* " Three facilities uiill have completed
nods per IE Bulletin 80-06 by S10101 Li»t of equipment d
tttatus of criteria end,
C(XJNB1L,H, 0. Connuctletit Yankee Atomic Pomer Co COUN9IL.W 0
Northeait Utilltlei BO/06/13 43pp
— S007070324 Revised LER 80-01Q/01X-1 nn 000508. d or irrg DiigoJng hanger
base-plate anal gsis, both «vc water headers declared
inoperable Caused by supports not providing factor of
safety greater than two Redesujn !i mods completed B0063t
» Northeast Nuclear Energy Co (subi of Nortlienst Utilities)
00/06/27 2pp
8007020700 Forwards IE Bulletin 00-13, "Possible LOBS of Emergency
Notification Ego IENB) W/Loss of dffsite Pouer " Written
retponBB r*qvtred
Ofiiefl, B H RBfllon 1. Philadelphia, Dffice of the Director
flO/04/lB, Ip
BO071B01Q7 Submits reply to IE Bulletin HO-OB re eiamination of
contatnm«nt liner p*n«tralion welds Due to absence of
abnormal conditions, no further action planned
COUNBIL.H.O. Northeast Utilitias BO/06/19 Ilpp
0007070361 Forwards LCR 80-032/ODL-O
MHOC2KA, E J Northeast Nuclenr Energy Co
Utilities) BO/Ob/37 lp
of Northeast
— 0007070372 LEfl BO-022/03L -0 on B005S9. during engineered safeguards
actuation sy9 tust, 1A actuating modulo placed In tripped
condition Fane iU d not shift tn 1 ou speeil Cause suspected
to be sticking of module output relay KMSft
CUEMENT.C Northeast Nuclear Energy To [subs of Northeast
Utilities) BO/06/H7 lp
188
BO07l4(135i PNO] -00-096 on 800701.73 new fuel bundles discovered
(Fabricated ui/<l e-slgn error in one dimension Cause unstated
New Pud bundles being prepared For shipment back to
We*ti ngn ouse far mud Presi release luill bi> issued
» Office of Inspection t, Enforcement. Office of the Director
BO/O7/Q2 lp
of Northeast
8007890409 forwards LEF1
MRdCZKA.E J Mortheast Hurl ear Energy Co (subs
Utilities) SQV07/1B lp
— 6007250410 LER 00-023/Q3L-O on BOO&SS.core barrel monitor declared
inoperative tuhen computer would not respond to Input
command*; Caused by naturdl end of life of tun circuit
boards Circuit boards replaced
CR1BCIDNE, J L Noitheast Nuclear Energy Co (subs of Northeast
Utilities) 00/07/10 Ip
B007110337 Order granting eitenslon until B00723 COP Confllnion to
elect whether tn review deci»ion tak»n under 10CFH2 206 on
request far enforcement action, DD-BQ-S3
HOYLE, J C Office of the Secretary of the Conmission 00/07/09
B007300412 Advises that effective BQOBO1. addreil for coalition utll boi
I1O5-C Olive 8t, Oreenlbaro. NC 37401 Delated correspondence;.
ALLEN.J North Anna Environmental Coalition BO/07/19 lp
H Central correspondence
0007130047 Responds to 000327 1 tr to President Carter ro granting VKPCO
authority to build another nuclear plant Discusses util
plnntt, operating & under canst d relative coiti of coal va
nuclear energy
YOUNOBLOOD, B J Operating Re»etorl Branch 1 BO/09/13 9pp
DOCKET 50-333 NOFITH ANNft POWEW STATION, UNIT t
E, NRC Safety Evaluation Report OER), siippls J. correspondence
BO 07 30 OS? 7 Forwards iliacussior. of util BO 07 1 1 b 19 responses to
deficiencies listed in SCR Full-punier operation should be
authoTiied upon obtaining FEIfA approvoble of state d local
emergency plans
CRIMES, D K Emergency Preparedness Task Force BO/07/22 Spp
0007070059 Forwards 8006BO Director'* Decision DD-BQ-23. d«nuln||
BOOB1B, 23, 0123 b 0523 rnn.u»st» for action Ffi notice fncl
DENTOKI.H R Office of Nuclear Realtor Reoulntiom Director
GO/06/20 Zpp
—0007070064 Decision DD-BO-33, denylno 800218.88.20,0423 fc 0&B3
by North Anna Environ coalition for action
DENTON.H R Office of Nuclrar Reactor Regulation, Director
BO/06/BO 2Spp
F aacuritiji m«dical> BmBTflency (, firo protection plans
B007H4000S Forwards amondcd phijalcal Sipcurity plan I'lan withheld
(ri?P 1OCFR2 7901
SYLVIA, B R Virginia Electrlt !< Pouer Co flo/06/03 lp
B007170601 Forwards rcviBBif nutlpar security personnel training
qualification projram E. response to NRC QOOS19 1 tr Program ti
response uitli/ield (ruf 10CFR2 7 90)
R yirginia Electric !< Power Co BO/07/ H tp
-B007070069 FR notice of iisuance of 00062O DJrector'i Declilon DD- 00-23
dtnylng 000S1Q. S3, 30. 0429 & 0383 requt.tt by North Anno
Environ Coalition for action
DENTON-H R Office of Nuclear Reactor Regulation, Director
BO/04/20 3pp
-B007O70075 Requttts amand to 80D21B Itr folloulng diicovarg of add!
problomi in stean generator, Facility fnould be kept «hut
doun pending resolution of noise, (econdaru chemistry, turbine
cracfcA t demineral 1 i«r problem*
ALLEN/J North Anna Environmental Coalition 60/02/22 lp
BOQ7240Q9P Foruiards security info re 800609 Itr Info uithhald
(ref 10CFRH 79O)
R Virginia Electric 6 Pouior CD BO/07/1Q lp
8007230979 Foruiards emarsEney plan Ilevlaion 4 in response to request
made during1 B007I5 meeting u/FEMA t< State of VA. tn support
Full pouer license request
BAUM.E A Virginia Clectilt t, Power Co 00/07/22 22pp
— BOQ72205B2 Facility Hmergencij plan, Revision 4
« Virginia Electric d power Co BO/07/19 13pp
— -B007070079 Requests action conc»vning defective dtmln*r«lli»r d
related corrosion Si cracling in steam generator* It turbine
discs Commendi NRC decision to require EIB re experitnental
rDplaeeflient ot steam generators
ALLEN,J North Anna Environmental Coalition 80/02/1B 4pp
J Insurance b indemnity information
00071504VO Forwards Endorsement* 20
P1ERCE.D A Mar»h ti McLennan, Inc
Dlv 80/07/10 3pp
27 to NEL1A Polled NF-340
M 1" H Nuclear Consultants Inc
Q0072D0136 Foruarifs emergency prepdi ednoBB roquiremonts for full power
licensn per review of 00041V, O606. 9O I. 25 submittals
Requests scltedule for meeting requirements
TEDEBCO.H L Aisifltsnt Director for Licensing BO/07/S2 flpp
000/300432 Forwards rcvise-d emergency plan implementing procedures
Procedures iivallable in Central Tilae only
HAUH.G A Virninia Electric !< POUIBI- Co BO/07/HH lp
B007300297 Forwards iliscussion nf util B00711 t, IS responaes to
deficiencies libteil in S!EP Full-ppuier operation should be
autnoriied upon obtaining FFH(\ appravable at state t local
emDr9Bncy plans
i D K EmHi-uenrij Prep.nodnpf.fi Task Torce BO/07/22 5pp
Requests thai Itrpfiimildi ID end draft Itr, bn fornarded to
uttl re encl revloui of emergency action levels for facility
*mnrDencij plan
PAOANO, F 0 Emargentg Preparedness I iconsing Itrnnch 90/07/33
llpp
6007350393 FofdiardB Revision 5 to station emergency p Ian, completing
r-BipontJB 1(5 ItK Ci'iiriBS. 6007(5 cjimmPTits
,E A Virginia ClectTic ft Pnmer Co 80/07/24 3pp
— aOB7S503B5 Emergency plan. Revi slnn 3
* Virgini.1 Electric ft Power Cn BO/O7/34
0 Ad judlcatory cnrrflspondcnce
0007310P43 roruords tlnmuilBsiiin BOOH27 memorandum It oriei contninins
decislpns on UC3 70050S pBULiori for reconsld»rabion of
7BO413 momotandum l> order UCS V7I104 pt'tltion Bought action
ro fire protect ion f-or alefbrical cableB
EIBENHUT»[> fl Biviiion of J-ic«?n*inn. SO/Oi/35 09pp
P Operating license stage documents ti correspondence
8007230077 Requests submlttal of proposed Tech Spec changes providing
for redundancy in decay heat removal capability in all model
of operation Model Tech Specs which would provide acceptable
resolution encl for guidance
EIBENHUT, D 0 Division of Homing BO/06/ H &2fl|)
B00710007B Forwards request for addl info re adequacy of station
electric distribution ivt voltages per review of 79100? &
77112B submittals Requests response within 45 days
CLARK.R A Operating Reactors Branch 3 BO/06/23 5pp
B007010432 Responds to NRC 800307 Itr re loan of offsite power, Review
of history reveals tun partial losses of offslta power
occurred.
SYLVIA.B R VirBinio Electric fc Power Co B0/0&/a6 3pp
B007010430 Confirms agreement u/NRC ro revisui criteria to be u«d to
evaluate results of rod swap tests b adralni stratlan of
physics test program should deviations occur
THOMAS.U N Virflinm Electric t Power Co BO/OA/36 App
Q007020496 Forward* addl info re corrective actions for steam
generator chsmiatru fc corrosion. per NRC B0040B request
BYLVIA.u R Virginia EUctric fc Power Co BO/Oi/30 19pp
B0070aoS7B roruiarus "North Annn Unit 1. Cycle S Startup Physics Test
Rept "
THOMAB.M N Virginia Electric fc Power Co BO/06/30 lp
— 900702037B "North Anna Unit l.Cucla 3 Startup Physics Test Hcpt "
KUNBIT19-T J , LEnERSTIEN.J H . LQIITD-E J Virginia Electric &
Pnuer Ro VEP-FRD-33 BO/Od/30 llOpp
189
8007070368 Forwards request For info re bypass tt reset of engineered
*af»tg features Request revised per BOO92B discussions
W/NHC
CAfiFAQNQ, S P Franklin Institute/Franklin Research Center
NRC-03-79-1 IB BO/Oi/30 3pp
8007290001 Requetts submittal of application for amend to license
contiitinfl of Tech Spec changes d license conditions PUR
Modal Tach Specs & Model license conditions for TMI-a
tenant Learned Category A items encl far guidance
EI8BNHUT.D 0 Division of Licensing BO/O7/OB 69pp
BOO 7080069 Application for amend to License NPF-4, adding requirement
that ECCB subsystems be demonstrated operable by verifying
that manual valves In Ttch Spec 4 3 S g S are locked d
tagged in proper position following malnt Fee encl
FERCUSON, J H Virginia Electric t. Pomer Co BO/07/03 3pp
— B007OBQ072 Propomed ravimed Tech Spec 4 5 S g. adding requirements that
ECCB lubtyitemi be demonstrated operable by verifying that
•anual valvei are locked b tagged in proper position
following nalnt
* Virginia Electric & Power Co 0Q/O7/03 2pp
BO071002SO "Bump Pump Discharge Piping Auiillary nidg to Containment "
* Stone & Webster Engineering Corp 77/10/24 Ip
— B00710O3B4 "Flow Diagram Boron Recovery Bys " Sheet 1
« Stone *• Habsler Engineering Corp SO/O7/07 Ip
— BO07J 00268 "Flow Diagram, Containment Atmosphere Cleanup Bys "
» Btqn» fc Hebitir Engineering Corp 77/1O/23 lip
— BQ07100293 "Flow Diagram Maste Disposal Bys » Sheet 2
* 6 ton* & Webster Engineering Corp BO/O7/07 Ip
--BO0710QS9B "Flow Diagram, Wast* Disposal Sy6 " Sheet 1
* fltona * WBb»ter Engineering Corp BO/07/07 Ip
BOO72B0169 Advises of 300428 reorgani lation of DFc of Nuclear Reactor
Regulation Lists personnel responsible Par facility
NOVAK, T M Assistant Director fur Operating Reactors SO/07/OQ
B00714Q393 Application to amend License NPF-7 consisting af changes to
Tech Spec setpotnts b allowable values
FCRQU8DN.J H Virginia Electric (, Reiner Co 60/07/11 3pp
--B00714O40Q Revised Tech Sperv Table J 3-1 for i eactor trip BUB
Instrumentation trip aetpoints d TaOle 3 3-4 for pnglnt'oreS
safety feature actuatmn iijs ins trumentat ion trip setpoints
* Virginia Electric d Pouer Co RO/07/11 6pp
BOO7150969 Notifies that ulil Is ubinfl dual sun at notification far
site t< general emergencies in tooperdtion ui/lota! counties
at insistence nf VA State Ofc of Emergency ft Energy Svcs
Tentative implementation schedule for NUREO-06S4 encl
BAUH.E A Virginia Electric J. Power Co BO/07/11 HOpp
BOO721O1O3 Notification of 800724 rai>etino u/otil in Betheada.MD to
discuss analysis op quadrant tilt
CHATTERTON.M Core Performance Branch BO/O7/11 Spp
SO 0734 02 04 Notification of £00724 meeting u/util in Betnesds.MD to
discuss quadrant tilt in plant
C HATTER TON, M Core Performance Branch BO/07/11 2pp
8007310421 Comments on NUREO-0&/7, "Pntential for Loui Fracture
Toughness fc Lamellar Tearinp on PWR Steam Generator t
Reactor Coolant Pump Supports " IJequests extension of review
period to B00913 to ravieui stress corrooion cracking
BR-DMN, g C Virginia Electric (< Powpr Co SO/07/SI 2pp
P00735O'113 Requests tinm eitoiiKion to replace Ddrton Transmitters to
third refueling outage of Unit l.Lot 1 Replacement of
Unit ui/rofuellng consistent ui/current tlansmitter
availability B» previously discussed
SYLVIA,!) R Virginia Electric (. Pouicr Co 00/07/33 3pp
—8007100303 "Vnntllation Thermal Recombiner "
» Bton* Si Mebiter Enoineerlng Corp QO/04/07 Ip
— B007100301? "PI.ID Liquid Sampling " Bheot 1 op S
» NUB Corp BQ/OS/03 Ip
— 000710031 1 "Pi* ID Liquid Sampling " Sheet 2 of 5
• NUB corp ea/03/ii. ip
--B007100313 "PfcID Liquid Sampling Coolers " Bheet 3 of 3
* NUS Corp. 80/05/05 Ip
— B007 100321 "PldD Liquid Sampling Panel " Sheet 1 of 5
« NUS Covp BO/OS/03 Ip
— B0071 00323 "PfclD- Liquid Sampling " 3 of S
* NUS Corp 80/09/03 Ip
0007200691 Provides summary of results of Phase 1 of multiple structure
advance record BUB evaluation of piping sys design Final
detailed rept Dill be submitted upon completion of Phase 1!
effort Category listing attached
SVLVIA.B H Virginia Electric !, Pomcr Co BO/07/25 3pp
B 00729 0700 iiummariies results of Phflst? I of multiple structure
amplified response spectra evaluation of North Anna 1 piping
sga desion as described in Q0060fj Itr Finel detailed rnpt
will be submitted upon completion of Phase 11 effort
BYLVIA.B R Virginia Electric (, Pouier Co 80/07/55 3pp
0 Inspection reaortsi IE Bulletins >i correspondence
QOD7P4023O Foruiards IE Info hlotice QO-20, "Loss of Drcaij Heat Removal
Capability at Davls-ElesDe Unit 1 While in Refueling Mode "
No response required
O'REILLY.J P Region 2. Atlanta. Dffice of the Director BO/O3/OB
3pp
—8007)00339 "P41D Containment t< Air Sampling Sys " Bhdct 1 of 1
» NUB Corp 80/03/03 Ip
--0007100335 "Procflst Flow Diagram, Liquid Sampling " Sliest 1 of a
» NUS Corp 80/05/22 Ip
— BO0710033D "Pr>oc»»K Flow Diagram' Liquid Bnmpling " Sheet B of 3
« HUB Corp BO/OB/aS Ip
0007020300 Forward 6 IE Info Mattel' 8Q-S*!- "HrealdounB In Contamination
Control Programs " No written response required
O'REILLY. J P Region 3> Atlanta, Of I ice oF tlic Director BO/O5/EB
B007310477 Foruiards IE Ctrcul.ir BO-13, "(!nd Strap Dflmafle in
HestinghnuBB Fuel Assemblies " No written response roqulred
O'REILUY.J P Region 2i Atlanta. Office of the Director BQ/03/28
IP
—8007100347 "Process Floui Diagram Containmenb Air Sampling "
« W8 Corp 80/04/14, Ip
— B007100331 "Otnurfll Arranfl'*'""''; Auiillary Bldg. Drumming Room Plan,
tllavfltion 274 Ft " Sheet t
» NUfi Corp 80/03/29 Ip
-• -8007100359 "Goneral Arrangement Auxiliary Dldg, Drumming Room. Section
It DtftalU, " Bheet S
* HUB Corp, BO/03/27 Ip
— 8007100349 ''Bnnerdl Arrangement High Radiation Sampling Sys Waste Tank
fc Pu«ipB-Pl«n Elevation H4-) Ft, b Inchoi. fc Section " Sheot 1
* MU8 Corp BO/05/59 Ip
B00701033? Forwards IE Info Notice BO-23. "Losa of Suction to Emergency
Feeduiater Pumps " No uiritten response required
O'REILLY. J P Region 3, Atlanta, Office of the Director 80/05/29
IP
B007160733 Foiuiards IE Insp Repts -iO-jaB/SO-?.) *< 50-339/80-33 on
BOOSI3-19 No noiicomplianco noted
MURPHY, C E Region 2, Atlanta, Reactor Construction S, Engineering
Support Branch BO/06/01 2pp
— B007160/42 IE InBp fieptfl 90-339/80-23 Si 30-339/130-^3 on B0031E-15 ND
noncompliance noted Major areas in-ipcctod sHiDmic analysis
tor as-built safety-related piping sys t, 1 irenbee actions
on licensee Identified itcma
CDMPTON.R H fiwgion 2, AHonfci). Office OP tl,c Director
HEFtDT. A R Region 3. Atlanta. Hoac toi Construction !< Engineering
Support Branch 80/06/01 5pp
Forward! Ib 1 nf D NtUi r c HCI-36. "ETvn] uat lull oF Contractor
orris " No ur4tt<m rot-ptmsa i«qulri>d
.0 P (legion 3, Atlanta. OFfito of ttiv Director 6O/O6/JO
niruauls IE Infn NuLire BO-S7, "Dogrndat J on of Reactor
Hump !3tud3 " No bpcciflt action or response
iJ P Region Si AllantBi flpfico of the Diroctar QQ/Q&/1I
F-oriirards r»vitlnn tn I'ag a J uf £100411 rnBponao to
00-12. "Decag (In-fit Hrmoval flu E OpernbiHtij Hl
I) Virginia Electni. ft Power Co HO/O6/ 1 6 Hpp
H007230')'»7 Forwards response to notice u* violation Item reported in
JE Insp Repta SO-33BVSO-a5 & 30-339/aO-&i Infraction 1* not
correct as stated Po int-ny-point rebuttal provided Imp
re-pt* contain nn proprietary Info
i B R Virainla electric & Paiaer CD BQ/07/1H Spp
R Periodic operating reports b related correspondence
8007220431 FoTUflrrii monttily operating re-pti for Jun» 19BO
SYLVIA. B R Virginia Electric ft Power Co BO/07/13 lp
— 3007B20436 Monthly operating repts for Juno I7HO
H AD 1 9 DM. W R Virginia Eloctiic *c Power Co BO/07/09 9pp
Responds ti) It Bullolln 7-V-OlIh "tiwlrciTi Class t flection oF
Tiunt " rinnn CE u I oc (r i cd] i>i|Ul pmunt rcvlouo-d to
>rtc tinning ifurln-g jioatul <itcd acrtdont Rpvicui of
oron 1 1 3 *i '} (irovidiid in nnr 1 rtpts W/o one 1 rcpts
R Vlrolnla ClectriL !. f'aiaer Co tlO/O/j/l^ 3pp
S Flsportaolo occurrencHBi LEfis R related correspondence
BOD703O263 Forward! LEH SD-032/O3L-0
CARTWRrQHT.M R Virginia Electric & Pouiar Co SO/Oi/30 lp
roruraiMla IE Rulletln 110-lSj "fmilbJc 1-usn Dp Emflrgoncij
ton 'ius (EN1!) W/Loi.a uf nffotte CiiuiHr " l4rittaT>
rffquiveil
J P ru-ginn 3, Atlanta- Office of tliff Uirentor OO/Oi/le
— H0070JOa67 LER aD-0&H/O3L»0 on 000930, prol iminnry anal^aii reiulti of
turliinD first «Kago preaaui-e input to interlock P-7
indicated that sot points eiceatfed T»i.t> Bpet llmlti, C«U»B
undetermined Chanflss to callbr jirocoiJuroi will 6» mad*
« Virginia Electric fc Poiuor C» BQ/Ofr/30 2pp
K-ni'iunrilB IE €lrciilJlr 00-l"i. "|.Q*B of Re.ictor Coolant Pump
Natural Circulation tonldriun " Ho yritton rusfiDnse
J P (ieg i on
GPfiLs of the Dtroctai-
ForuarJii 1L" Circului UO-1'1, "Rnitio active Contamination of
Inci Q 11 a trt Hatvr fly E fi n«iul tout Internal
ttnn of Pnnnnnol " No uiiltton ioiipoli*ei roq.uirtjd
J h' HogluTi 2, AtlanKa, OPfitu nf the »i roc top BO/06/24
toanun-ilB to tt" OuDebl" 79-l<l. "TolomiL Anolyali Par
Snfo tij-FJuliitoil IMptnn Hi|B " CuniL uiorli romplote- un
im.itod LompSlftion ilntv fur Unit I In EIROF1J1
ViroiniH KleLtrlr I Puuar Cu nn/Ofi/S7 3pp
"arujnrite IE [Millotin HO -Ifn "Patent la 1 Mi oojip I i
trie flodi-lB 1)!31 tr I1B2 Pri'ueure Trannml ttifr o
i or I) Output CoclBD " llnltJin rDapungn rnqirlrbd
r (10~Ui nlou one I No lurittun ion|ionr,o roqiUrnd
i I" n*gtpn S, ntlontJi. Clfflro nf tlm Dirsctar
Tunrds IE Jntp llnpto nO-'llll/Ba-KI (. SO-3n[?/aO~34 on
i norii-nmp I lani. c nntof) Dstfillo withhold
770!
iicijicin a, rttlontfl, OiifuoniTile Urimcli e]D^O//Ol lp
i«nco nutjd Major iicwds Inapueted vita! arnn
• auarcdcB '. vital 'iruo niLOBn Da In 1 In uil tlihs 1-d
"HS /TO)
-i r (' Fleoloi ;j. Atlitnt.i. HaPogunvilfc Dr-aiich rOBlN-W
. At Unto . UfUcif of Dhti IMroctur UO/0//O1 lp
iirwariln r*s|ionBO tu viPlfllion nutod In If. Inap R*pt«
>..' ». &0-,n')/(]t) -111 Lorrnctlvn iictinn» review
if tiitt cnntrnl |!rucj)vim li ut-ntliH) rnyl will
Itr ri> pm-iniMi tuut srhcduling reflg IrsmBnts
yirfllnid EinrtrU ?i Pownr Cn fiO/07/OH Spli
iriaardo "IF llullpUn AO-Dnij riovieu." in r«-»ponEB to action
i Item t nf It liulltitin (10-11. "l-I.-isoni'U tin 1 1
•Hi nvaflublo in <irntr^il F-iluo only
Uirglnin l-lcrtrii (. POUJIIP I'd (JO/O^/O? tp
S007O30270 Fiiiuarifs LER BO-05O/03L-0
CARTHRIOHT.H H Virginia Electric & Pou»r Co
BO/06/30 If
— 00Q7O30271 LEfl BO-030/03L-0 on B00331 1 dur i ng iteam g»nor»tor 1A channsl
3 narrou ranao levul tranaoitter rncalibi-i dotnvminsd that
transmitter had drifted 3/i hlgti Can led h g normal inntrumnnt
drift. Transmitter recalifrr Imnci) iate 1 g
CAHTWfiIOHT,U fl Vii-gtnia Electric fr Pouor Co HO/06/30 2pp
B00709034B Foruerda LER FJO-Oflfc/03L -0
CAFITMFJIOHT, H H VlrulniJ Electric &
Power to FJQ/07/02
— 8007070353 LER HO-Oflfo/oaL-O on no0612.Mode 1 level Ind icator, Ul-1474,
on A steam generator read SX higher than other Indicators
Caused hg nt^am leak PII upper transmitter isolation root
valve Bt-eam leak treated u/T ill-man i te
CAHTHBIOHT.H fl Virginia Htuctric & Power Co 00/07/03 3pn,
G007210092 Part 31 rep t re existence of niineonBarvativo niiunption in
cold oh ut down detlgn bneis boron dilution accident unalysli
in FSAR Cab Bed bi) LIU* of incorrect sgs Vol Devieu Mill be
pei" formed to Identtftj b analtjip adtSl accidents
EJVUWIA-B R Virginia Electric & Pouer Co 00/07/OH 4pp
0007070373 Foi-«j»!'ds LEW 00-O94/O3L-O
CARTHRIOHT.H R Virginia Electric !. Power Co
— B0070703H1 LED 00-(>51/03L-O on 00OAO3, Luntainment internal air pjirtlel
pressure eieeodcd Tech Bpac limit Canoed bij air Itafcag* pait
eontaininHnt purge oupply valve Vtflvo subsequently verified
closed 1 InJ* tested
CAIJTWRIGHT.W Fl Vlrflinia Electric & Power Co BO/0//03 Spp
BOO71SOAB& FDrwor
CAHTWfUOHT, U H
B LtH BO-OS7/03L-0
Ulrijlnia Electric
Punier Co 80/07/07
— B007150701 LER FJO~OS7/O31,-0 on 600610. during Mode a operation, greater
than tuinlvc ntup i)i Bagraement ua» noted beluoen Individual
d group position indication fnr rod O-9 Caiised hg voltage
drift in algn-al con-dlt i oni np tard
CARTWFtJGHT, W R Wii-giTtla Electric (• POUBT Co BO/07/07 Qfp
E007130767 Foruarila LFF1 DO-OSH/OIT-0
CAttTWFilBHT.lJ R Virginia Elflctrlt
PouiOI- Co BO/07/IO
iiuiiicia i*B»pon»» In IF- DuMntin 110-00. "Ciam of
ratifin Uold« " Penutrnt i on ontemblim of filled
g design uiiru uard for p on* Irntt ono liatuil In
i.' fnr Niirth Anna
ytrointn E-Uttcli ft Power Cn, f 10/07/07 7p
— H007150777 LER BO-O59/01T-0 oil G00636, revi ou nf F8AR oafstu anslg
Par boron dilution accident* determined that noncangirvatlva
FIGS vols were usoi fur cold stiutiloiiin cnndltlan Cause
undetermined Solution ponding further evaluation
CAItnjRIOHT.H f? Virginia Electric *< Power Co HO/07/10 3pp.
i^niiijt la 1C Uulletin (HHlO re cnntsml njitlon nf
tve i,ge List* ayn ronsido-rod nunrdiTloflc: t iv<t but
laiHodt live thrnujjh in t erf nco-b w/rodioac t ive
Lhdige pntlis flrn Bilmpled ur Wi>nl loreul
yirfllnls Rlectrn (. Puu-BT (in H0/07/O7 0|«P
0QO7110:)00 RO BO--SS/O1 T-{> during review of FSAR saFety analyiai
boron dilution dceitfent potential, roncotisorvatiam in cold
shutdown analysis determined Cause uninown Accident analysis
ravieui initiated
* virgtnia EJBctrlc t> Power CD 09/07/11 lp
*poinf» to Item J1 *, .lii of ir Bullutln 79-27- "LDKH cP
stTiifTH-ntatian f. Confnl J'nwur 9^8 But During
Uni t 1 inverter trip uini. not rplntDtf to Pailuro
tb«d in liullotln
Virffinin Eloctrir d Powor Co (10/07/OV Spp
SOO722D573 Foriuaril* LEU BO-05B/O3L-0
CAItTHRlQHr.M R Virginia ElBctric * Pouer Co
BO/ 07/1 6 lp
191
-- SO0722O38O LER 8O-OSB/03L-0 on B006l9.uhile in Mode 1, post-ace ident
hgdrogon analyier declared inoperable after survei 1 lance
tasting performed Caused by rtlhgdragen analyier T/C bridge
failure to tfnerglie du« to sample line 1 DID back pressure
CAHTIffllOHT.U ft Virginia Electric h Power Co BQ/07/16 Spp
$007300307 For ward i LEfl BO-056/03L-O
CiWTURIOHT.W R Virginia Electric t, Pouor Co
B00734O092 Foriuarfls serunty info re 800409 Itr Info withheld
(ref 10CFRS 790)
SYLVIA, P R VirBinia Electric f< Pouier CD 80/0//1B ip
0Q073SO579 Forwards emergsnci; plan l?avn,ion 4 in response to request
made during EDO? 15 meeting m/PEHA !> State of VA, to support
full power license request
BAUM.E A Virginia Electric & Pouor Co BO/07/22 33pp
— &,€(>/:?•<, 13 12 LER 00-OBe./03L-0 on B00634, after trip caused by falsa
ova. .amp dalta T signal, false delta T output discovered In
ehfli.nol II DELTA T/TAVO protection sys Caused by «umminB amp
card fa loud/log derivative card Cards replaced
CAftrWRIGHf.U ft Virginia Electric b Poiuer Co BO/07/17 Spp
8007330493 Foruordi LER BO-061/01T-0
CARTWRIOHl.U R Virginia Electric & Power Co
— 000/230497 LER BO-Oil /O1T-0 on 00070B, SS.U review determined, under
certain Occident condition*. aux 1 1 iary Peeduater pump 1-FH-P-
DB nay be unabla to supply 340 gpm CBUBB unknown Pump
rvclrculution flow or BO onm secured
CAHTHRIOHT.H R Virginia Electric l> Power Co BO/O7/17 Spp
8007£W>e3e Forwards LEH BO-OS9/03I.-0
R Virginia Electric & Power Co
— B007Sa03flS Facility emergency p Ian. fievisi on 4
» Virginia Electric t, PGUBT Co 8O/07/15 I3PP
B0072QQ156 PnruiardG emergencij prcparodness i equiremonts for full pouer
licun.B per review at 300119,0606-20 & 35 submittalo
Requetti schedule for meeting requirementc
TEDESCO.R L Assiatant Director for Licensing BO/07/32 4pp
B007BB0133 Foruardi revned omergoncy plan Implementing procedures
Procedures available in Central Files only
BAUM.E A Virginia Electric t< Pouer Co BO/07/2H Ip
B007310193 Ftequeetft that Itr, similar to end draft ltr.be Forwarded to
util re end review of emergency action levels for facility
imeroencu plan
PAOANO.F O Emergency Preparedness Licensing Branch SO/07/22
llpp
LEO BO-OS9/03L-0 on B(JOft33. Jui-jng ptriadic tint an law head
sofntij injection nji, ret irtulett nn vulv* failed to riopvn on
dafMntf fffBulting in blockad recirculation flow path Caused
• V dafeetiva ultctric*! suit~<i Locking ring replaced
CARTWRIOHT, H, R Virginia Elattric t, f'ower Co BO/07/K2 app
V Opt rat or Eliminations
6007170343 Forward* revl*ad> "Licenttd Dperator Dcqual i f icatlon
Prograoi. " in roiponaa to NRC 8QQ3SB rrmuest All traininn
inatrutrtort »r» required to participate in proBram to
Maintain proflclincu
8VLVIA, B R Virginia Electric (. Power Co GO/07/15 Ip
— B007170350 Hnvltadi "Llcnnsud Operator Hequnl 1 f Ication Program
» Virginia Electi ic t, Pouer Co 00/07/31 llpp
DOCKET 80-339 NORTH ANNA POWER STATION, UNIT S
A, ApplicBtlun/ccmBtructian stage documents & correspondence
B00784DO*? ftnipondi to HflC 000710 request for addl Info re OA list Air
•Mhaup for control room air conditioning ayi it provided
by vent fan* No makeup fan mo tore eilit in tyi Diesel
janorator oldg ventilation is provided bg normal Intake air
A Virginia electric «, Pouier Co 60/07/82 Ip
E, NHC Saf'tU Evaluation Report <BEF1), luppls !< correspondence
BO07070200 RvinondB to BER Suppl lOi Section 19 2 request for commitment
ro nuo»tloni on analgiii of postulated steam lino &
•(tBdwatar lino breaks U*«tinghou«e will provide requested
info which la not directly applicable to facility
DVLVIA.D.R Virginia Elactrle fc Pouer Co BO/07/01 Ip
800730029? Forwards discussion of util B00711 (. IB responses to
deficiencies listed In SER Full-pouier operation should be
author i«"il upon obtaining FCMA approvable of state b local
on*rg*n<:v plans,
OR I NEB, B K Emergency Prtporcdncea Toe* Force 80/07/83 Spp
B007280444 Forward* supplemental info re full potuer SER Evidanee of
«nf*tv fc reli*f volva capability from teats performed in
EPRI/MSAC safety t, rUUP valve test program will be
fomardad hij B10701
R Virginia Electric t. Power Co SO/07/29 Spp
F. Security, medic*!, Bmargonry b fire protection plans
BO07240003 Forwards amended physical security plan, Plan withheld
(r»f 1OCFR2 790)
R Virginia EUctric (. Poiuer Co SO/06/03 ip
8007S303B3 Foruards fieviaion 9 to station emergency plan, completing
r*ipon*e to BK Crimes S0071D comments
BAUH.E A Virginia Electric & Pouier Co 00/07/34 2pp
8007170&01 Forwards ravised nuclear security personnel trainino
luallfleation program t, rasponse to NRC B00319 Itr Program fc
rtiponn* withheld (ref 10CFB3 790)
flVLVJA.D R. Virginia Electric t> Powar Co BO/07/14 Ip
— BO072903B5 Emerjsncy p lan> Revi sion 5
» Virginia Electric & Pouer Cn 80/07/24
3pp
BOO 7230383 Advises that QQU630 Itr contained error in describing date
op most recent etercisc or vmaryency plan Ltr stated that
eiercise conducted In Dct 1779 Correct history of emergency
plan drills contained In 500711 Itr
BVLVIA.D R Virginia Electric I, Pouer Co BO/07/34 Ip
B007BH0440 Submits schedule for completion uf firo protection mods
Smoke detections nys & reactor coolant pump oil collection
sys uil 1 1 be completed during 801101 outage Charging pump
cross-connect will be completed during BOQ-40J outage
BVLVIA.D R Virginia Electric t. Power Co 50/07/3-5 Ip
O AdjudlC'ltory correspondenci
GO07310H43 Forum-lit Commission BOOB37 mBiriorandum & order containing
dacisionB on UC8 780302 petition for reconsideration of
700413 memorandum d order DCS 771104 petition sought action
ra fire protection for electrical cables
EIBENHUT.D 0 Division of Licensing BO/O6/23 B?pp
B0071 10339 Order granting eitension until aOO723 for CnmirnEsion to
elect whether to review decision taten under IOCFR3 S06 on
request for enforcement action, DD-BO-H3
HOVLE-J C Office of the Secretary of the Commission Sq/OT/O1?
lp ^1
0007300412 Advises that effectlvo BOOBO1, address for coalition uilll be
1109-C Olive Bti Oreensboror NC 27401 Related correspondence
ALLENjJ North Anna Environmental Coalition BO/07/15 lp
H Oeneral correspondence
B00719D047 Reapondi to BOO 33? Itr to President Cartev re granting VEPCO
authority to build another nurlear plant Disrusses util
plants, operating (< untler enlist I< relative coots of coal vs
nuclear energy
YQUNOBLODD, B J Operating Reactors Branch 1 BO/O-i/13 5pp
B0071B04SB Responds to 791303 itr re licensing netu nuclear power
plants Licensing of neu plants stopped aft or TM! until
criteria for improved safety could be developed Three units
have been authoriied to begin low leva! pouier testing
DENTON.H R Office of Nuclear Reactor Regulation. Director
BO/09/14 tp
— 0007180461 Forwards misdirected 791303 Itr re licensing of neu nuclear
power plants
RATHKOPF. C Cnerny.Dept of BO/01/21 Spp
BD07070D99 Forward i 600620 Director'n Derition DD-60-33, denying
600318,23.0435 h 0925 requests for action FR notice end
DENTON.H R Office of Nuclear Raactor Regulation. Director
ao/oi/ao app
DOCKETED BTE
80070700611 Decision DD-BQ-23 de-nying 000318,23,20.0435 lr 03B3 requests
fty North Anna Environ coalition for action
DENTDN. H R Office of Nuclear Reactor Regulation. Director
B007070O&9 FR notite of issuance of 800420 Director's Decision DD-BO-23
denying 800310,22,28.0435 t. 0335 requests i>y North Anna
Environ Coalition For .action
DENTQN, H R Office of Nuclear Reactor Regulation, Director
BO/O6/3O 2pp
3007070079 Recjjest'S action concerning defective deminera 11 ier design,
related corrosion it cracking in steam generators b turbine
discs Commends NKC decision to require E1B re eiper imenfcal
replacement nF steam generators
ALLEN. J North rtnna Environmental Coalition BO/02/1B flpp
I0702Q4QB Responds to MB McDonald 1 tr directed to DDE North Anna full
pDUBr license issuance uil 1 1 be discussed m/Commission In
Jul-Aug 1990 Surry IB in shutdown condition due to seismic
piling supports tnaiji !• iiii ] 1 return tn< power in Aug 19BO
YGUNODLQDD. D 0 Licensing Branch 1 BQJOb/BS If
BOO71BOO39 Requests add! info re addition of 13 snub bin Info nvedad to
complete review of FSAFt
YOUNQBLDOu, B J I- i cent ing Branch 1 BO/O7/Q3 4pp
B00717Q439 Forwards Amend I to License NPF~7i saf etg evaluation & notice,
of issuance Si availability
DENTQNrH R Office of Nuclear Reactor Regulation. Director
BO/O7/Q3 3pp
— B007170443 Amend t to Llcenia NPF-7. author i I Infl (pedal low power toot
program
DENTON.H R Office of Nuclear Reactor Regulation, Director
BO/07/03 3pp
— E007I7Q443 Safety evaluation supporting Amend 1 to License NPF-7
* Office of Nuclear Reactor fleoulation, Director 00/07/08
40pp
— 5007170119 Notice of Issuance b aval l»h i 1 i ty of Amend 1 to Llctnia
NPF-7
J Licensing Branch 1 80/07/O3 3pp
B007Q30&93 Forwards HB McDonald 1 tr eipressinfl concerns rfl continued
operation of facilities
DETANCOURT, B Energy, Dept of 9D/O6/OA 2pp
Insurance & indemnity information
Q71BQ49Q Forwards EmJoraemoivts SQ t, 29 to NEHA Policy NF-240
flERCE, D A Harsh t, McLennan, Inc , M !i H Nuclear Comul tdn ts- I nc
»lv BO/O7/1O 3pp
Operating license stage dncuments t< correspondence
07090053 Notification of 800627 site visit to perform seiimic detign
margin ovaluation of sa fety-related equipment
DF1OHEH1CK.A U Licentlng Branch 1 BO/06/33 4pj>
J7100HO Discusses 900609 site visit NRC personnel found tin visual
Jail cracks resulting from uneven settlements or shrinkage
lurin-g tours of tvc lildg i tur b i ne b Idgi au^i 1 1 ary lildg d fuel
bldg
HDTHHEflO, D j CHOKSfir.W . RQMNEV. N Htrirctural Engineering Branch
30/06/24 5pp
J707OEO3 Forwards request for add I Info re F8AR Info is required to
onplete MflC evaluation of QA list Info requested bij 900702
CLJNQDLGQD.B J Licensing Branch 1 BO/O6/2& 7pp
I70BO37I Llfita. topical repte for yhich, reaponses to outstanding
luestions mill be provided to allou SER to prnceod d to
ivoid delays in approval of full PDUIET npe-ratio-n Includes
JCAP-9HSA, -9230 K. -v?3£,
\NDERSON-T M Wes t inghou*e Electric Corj> 8O/O6/2S Ip
>7O10430 Confjrmi cgreement ui/NRC re rcvieui criteria to be uierf to
ivalnate rnsults of ro-d swap tests & administration of
ihljsics test rtrogram should deviations occur.
jioia Electric tg Pouer Co 80/06/36 ipp,
FHOMAS.W N
0007100373 Submits addl info re imp lemantation of ihort-tarm Lettoni
Learned requirement* Stetu* of remainlnu Category A itanii
raid-ijr itatut of deiign & in*tal latton of Category D mods fc
>chedule for implementation encl Foruards drawings
SVLVIA.B R Virginia Electric * Power Co 00/07/07 IBOpp
— SOO7 100277 "Sump Pump Discharge Piping Auilllary Dldg to Contnlnetnt
» Btone b Webster EnBi^Baring Carp 79/09/13 Ip
— B0071002B10 "Sump Pump Diccharge Piping AuiiliJirg Bldg to Containment
» Btone b Webstor Engineering Corp 77/10/24 Ip
— 8007100884 "Flow Diagram Boron Recovery 9ya " Sheet 1
* Btono tc UebBtcrr Engineering Corp BO/07/07 Ip
— B0071002B3 "Flow Diagram Containment Atmosphere Cleanup e««, "
» Bton« b Debitor Engineering Corjf 77/10/33 lip
— 8007100373 "Flou Diagram Haato Disposal Syi " Bhvet 3
» Btone b Webster Enaineerino Corp BO/07/07 Ip
— B007100H9S "Flow Diagram Wsatu Disposal BUS " Bh*et 1
* Stono Si Webster Engineering Corp BO/07/O7 Ip
— B 007 100303 "Vent Motion Thermal Rutnfnbinor "
» Btone J. Webster Engineer-Ing Corp BO/04/O7 Ip
— £3007100315 "PbID Liquid Sampling Cooler* " Rheet 3 of 9
« NUH Corp BO/03/05 Ip
— BQ07100321 "PttlD Liquid Sampling Panel " Shnet 4 of 9
* NUS Corp BO/OS/OS Ip
— 0007100333 "PMD Liquid Sampling " S of 3
• NUS Corp BO/03/O3 Ip
J7E30QQ1 Foruardi stitement oF policy re requirements to b« met for
urrent DL appl Icatjons. as derived from NUfTEG-0660 d Pound
n NUREG-0&74
IGENHuT.D 0 Division of He en "tint SO/ 06/24 2pp
17030 I 5i Rpsponds to request Par add] Info re re vision to Tech Bp»c
7-4 LDU head safetv injection sijs piping modt on Unit 3
»re different from mods on Unit 1 at rosult of e«p»rienc«
ainud during reanalyaia of Un« t 1
VlVlft.D R Virginia Electric & Power Co BO/Ofa/a? 3pp.
17030)51 Forwards summary of response to NURE8-U&&0 Pull pouer t<
980 raqulremertt Items which apply t-o operator training tt
Icensing have ienn implemented Work Is proceeding fcn
Droplets itsms in/810101 implementation dates
VLVIA.B B Virginia electric 1, Power Co 90/06/30 13pp
17070369 Foruiarils reqitest for info re bgpas-i tt reiet of engineered
afet^ features Request revised per BD05SB discussions
/NRC
ARFAQNO,B P Franklin. Institute/Franklin Reaoarch Center
RC-03-79- 1 1 B B-O/Ofi/30 3p p
— 0007100329 "PbID Containment * Air Sampling Sijs " Sheet 1 of 1
« tnia Corp 00/03/05 IP
— 3007100333 "Process Flou Diaflram Liquid BampHno " Sheet 3 of 2
* NUB Corp. BO/Q5/32 Ip
— BO07100347 "Procos* Flow Diagram- Containment Air Sampling "
* NUB Corp BO/04/14 Ip
— BO07100331 "General Arrangement Auxiliary Dldg. Drumming Room Plan.
Elevation 274 Ft " Sheet 1
* HUB Carp 80/0)5/29 Ip
— 8007100359 "General Arrangement Auxiliary Dldg. Drumming Room. 9«e tion
h Details " Bhnet 2
* NUS Corp BO/05/29 Ip
— B007I003AB "General Arrangement High Radiation Sampling Su.i Hast* Tank
& Pumps. Plan Elevation 244 Ft. fc Inches ti Betbion " Sliest 1
* NUS Corp 80/O3/29, Ip
7070301 Forwarris response to NRC BOO&25 request for info r» QA Hit,
AUH..E A VirgnHa ElectriL Ji Power Co BO/07/03 31pp
BOO7I10202 Pravidot summary of rosulta of control room hablt'billtu
revieu, in accordant;* UI/NUREB-D&94 b In rosponse to NRC
BD070S request Control room meet* specs »pt forth (n
applicable SRP sectioni fc reg gulden
BVLV1A.D 0 Virolnla Electric t. POWHT Co BO/07/07 Ip
BOO7100139 Notifies that HB&tinghouse SOOilij comments on power
flic ens ion procedures have been in-corporated into prnCBduras
Action satisfies NUREO-OftfcO, I torn 1 C 7 r Bquiramsn ts
SYLVIA. B fi Virginia Electric (. Power Co BO/07/OB lp
BOO7110364 Forwards "Steam Generator Hater Hammer D-omonstration Teat,"
per Tech Spec 0 1
FEROUBCN.J H Virginia Electric S. fouler Co HO/07/09 4pp
— B00711O363 "Steam Generator Water HfltnmBr Demonstration Test "
» Virginia Electric & Pousr Co BQ/O6/24 53pp
B007H03S9 Forwards response to NRC BQO3IO request far info re
auiiliary fBedwator sys design bacJs info li pump Haul
verification, Car Unit 2 Unit I info will folloui shortly
SYLVIA. B R Virginia Electric & Power Co SO/07/10 13pp
BOOTH 0361 Forward » descriptive Info For Action Iten II D 1 roquested
by NRC for full-power licensing rev! em Response to NRC
BOO701 request for addl info re RC9 vents ulll be provided
at loan as possible
SYLVIA, D R Virginia Electric l> Power Co 80/O7/1Q 8pp
QOO714013Q Forwards add 1 info requested in NRC B006J9 Itr re use of
aaf ety-grade equipment to achieve told nhutdoun
SYLVIA, n H Virginia Electric t, Poue-r Co BO/07/10 lipp
80071401B7 Lists addl TMI-related requirements which will be completed
by BlOlOliin response to NRC request
SYLVIA, H Fl Virginia Electric l< Power Co 80/07/10 2pp
B007140393 Application to amend License NPF-7 consisting of changes to
Tech Bpec setpolnts tt allowable values
FEROUBONiJ H Virginia Electric S< Pouer Co 8O/O7/11 3pp
--B007140400 Revised Tech Bpect Table 2 2-1 for reactor trip sijs
lnstrum»ntation trip cctpolnts S< Table 3 3-4 for engineered
safety feature actuation sus instrumentation trip sotpolntE
• Virginia Electric ti Power Co BO/07/11 6pp
B007140406 Responds to NRC 791314 Itr tt forwards. "Summary of Unit S
Motor Driven Auxiliary Feodwator Pump Endurance Test "
BYLV1A.B R Virginia Electric tc Power Co BO/07/11 lp
— BDO7140411 "Summary of Unit 2 Motor Driven Aunliary Feeduiate-r
Endurance Tests "
* Virginia Electric fc Power Co GO/07/1J 9pp
B00719O3&9 Notifies that util U using dual nys of notification for
• It* It general emergencies in cooperation u/local counties
at Intlstence of VA State Ofc of Emergency t, Energy Bvcs
Tontatlve implementation schedule for MJREO-0634 vncl
BAUM.E A Virginia Electric (. Pouier Co BO/07/11 20pp
3007210244 Foruarils revised Table 'J~l of HQQ/10 Tefcpuinn? to Nllt roqi
Po-r info ro puiili^irg Peoduiiittr 5ija requiTprnenta Info
available in Section 1 5 4 H J a f FSAFJ ilof-6 nut include
MestinahDUEp analysis of limttpd Fei'riu.iter break
SYLVIA. Q R Virginia Eluctrlr t, Pnmer Co HO/O//-1A 17pp
H0073aoOO6 Notification of BO!) AtJJ neatini) u/utkls in Outhmda, MD to
discuss mattei* re THI-J dated i L-numnriunt a
DltDMEFllCK.A W Lirenoing Branch 1 GO/O7/14. d.pp
B007300099 Eiumrr
teat program
ANUbllSDH, N R
of ROOi.K) site visit Ln obseri,
oc Ddur-Dt !. It-st fl-pviuw Hr.niLh
sp PC lal 1 aui power
HO/O7/1A 7pp
000731031-7 Provides. UT pi iminai-y sumtn.iru nf \.ptilal taste Lntond*il tu
churoc t PI i i e p]<int parameters during n.itui.il c 11 c ii-ldt i on
conditions InFo mill Improve operator training pro gran t
upgrade Birniilator facility Tist rept tn he fi.ruiarduil
SYLVIA, n R VirHinia Electric ft Paver Co F10/07/17 3pp
B00721034/ RDUpcndo tr MHC 800701 ri?i[iiH6l, for acfdl infa re full powiK
licensing nppruvol Eletnilori info t< draiuings ne HCH vcnti
enc I
BVLUIrt,31 R Vtrniniji Cloctrir !< Pouicr Co SO/O?/ 1 / hpp
B0073303B4 ForuarJE nd<l 1 info to util BOO7 1 1 ) br re RHR BIJB Simulnl i iifi
Of use of pro65HTiioi pouer -op ernt ed teiipp vnlvo tu
dopressuriio [ICG p-orfiirmed sfit 1 spat tori 1 y un BOO? IV f.
demonstrates alternate method of sy^ tnclitnun
n Virginia Elettnt !, Pouier Co fiO/07/ira 2pp
BCJ07310421 Coramenla on WUFfCe-0'377- "Potential for lou FTflcfcUro
Toughnoea f< lamollnr J Bearing fin PWK fituam QmioratDT !i
HDQctor CoDlant Pihmp ttupports " Wenuesls eitcusinfi n f v«vteu
period tfl BiWf 1 9 to rovioiu fitrtta corrosion tracfclng
BRHWN.S C Virninifl Electric & Power Co Rt)/O7/SI E!pp
B00734O1I5 fDrworde sugflcatpil Ttrh Ipor rhangp^ for .idjntni B tr at 1 vi?
rnntrnls, fatiih 1 inlipd .it, progr.ini tu I d put i f ij. i oci>rrt tr rapt
failures c-P or rhollunges to pouiT operated ruliof vnlves
Program oullimnJ in uti] QOOCj'iO reepnnvi! to NlirtEG-O/iAO
8VLVIA.D n Virginia Electrlr !, I'dwnr Cii H0/0//?a lp
— OOO7a40lli Huggantpd Tech Bpcr ch.i
* Virginia Electric !. I'oiucr Co
oea For aUra L n I fttrdtlvu control 6
110/01/11 Qpo
B007E40149 Foruarda add] Info IB HeuigTi dnin for 1 uiu Imnd nafnty
1-njectiDn pump dir>ch«rg» piping tJvoi K 1 1 n lirdiuingt cucl
BYLV1A.B H Virginia Elcctrir ti Power To HO/07/f'E Iflpp
— flO0724QI96 "lUitlilD Numb or 53"iU- 1 DDflfiA Soriea ITiOO, Wo 1 dlno End n
QutBidE Screw (. Yoke Oatu V.ilvu W^L ip (3to 1 >, SUB -;>-(,«
Limitornue Volve C'oritrol "
* Darling Vnlvo t, Mffl /.VOS/O5 lp
B007160307 Buhmito atldl info requested bu NHC re util 80DA1B request
for amend of Tech Specs to include addl safety-related
snubbers Design ti const of safety injection sya uihero
snubberi added Is dlscusse-d One ovorsliu drawing oncl
SYLVIA, D fl Virginia Else trie t, Pouier Co BO/07/11 34pp
--BOO72401 5=? "lOia^lO Number b.)'JO- IDIJft&A 3oi> l e * 3 'iOO: Hn Id ing Endu
Outside Screw !, Ynrk Onto V.ilvo W/L l p 1v,i\ t, BKB-f-W)
Linil torqiiif Valve Control "
* Barling Valvu I, Mf(i ,"2/(jEV,n lp
SO071iO671 Responds to NUC request Fur addl info re residual heat
nmoval ays Addresses use of preisuri lei pouiBr-operated
relief valve for pressure reduction of RCB Si advises of
blown ruptura discs Precaution ui 1 1 bo added
BVLVIA.R R Virginia Electric & Power Cn BO/07/14 3pp
B00717017S Forwards Hperating Procedures S-QP-13 I t, a-OP-12 2 TB
interim post-accident sampling in roBponse to NUHEO-OA60
Action Plan Item II B 3
SYLVIA, B n Virginia Electric & Pnuier Co BO/07/14 Bpp
— B0071701S3 Operating Proceduro 3-DP-12 1-Hevislon 1. "Sampllne Sys "
HARVEY, B L Virginia Electric d Poiuor Co BO/0-7/1 1, 30pp
— -BOQ71701B? Operating Proceduro 2-OP-ia 2i "Pout-Ac cident Containmant
Atna*ph«ric Sampllno Sgs "
HARVEY, S L Virginia Electric ft Pouier Co SO/O7/11 5po
8007320437 Forwardo oroprietara /ersion of Ajip A info re turoin* disc
«»tls properties, per MRC request Wcstinghoune oppl ication
for withholding enel Turbine disc info withheld (ref
10CFRS 790)
SYLVIA. fl R Virginia Electric t< Pnuier Co BO/07/15 9pp
— BOO72101*,! "3(10 lu Cast Alloy Btcol Motur Operated Oato Vn I vu H/Uutuld
ScreuJ t. Vote If tl t Uuilge Di'.r !- Dunni-t ,/[) i i! t fur iiufll
Hn-ldino-Oenerfll An semti Ig t, 1H mun none "
* Stuns ^i Wtbetpr, Ini » Crflnn Co ll/lri /H/03/(jr lp
--B0073101A6 "SflFcty Injection Bits Eieismn Ho Hit-mat 1 1 a I Model "
* Stone & WpbDfcer Enninuurnig forp 7n/lL'/04 lp
B00729O41B- OequeBts tioif o.toi.slnn «• rnpljrv Diirton Traniml t tor» tu
third rBPuellmj oiitege of Unit l.Lut 1 Wunldrampiit iir
Uni t ui/rBpu«l inij c ons i st-cnt ui/c ui T i-ut trvjimml ttei
avaitabilttij as previously dioiuiiHExl
BYLVIA.I) R Virgml,i Electut !, Power Hi fl()/07/l!t' Hpp
B0072at53?3 Forwdids "N.iturol ti i-c u] Ji tt tjn TPil Rapt, " conducted
B007O3-16, uhicli ciimplutPH i pqui rtimcuts Foi HlfHf-O-OACjO- I ton
SYLVIA, D H Viriini.1 Tlcutrn t< Poupr ',« trO/07/f>;> 1 1(
— -8007280400 "Natural flrLulfltidn Tool. Rftpl,
A Vtrgxnia filoctni !. Puuior Co
rnnrtuctu.J B00703-IA
fl(j/t)7/i!H ;lOpp
fl00735ft379 Inftii-ms o f i umpltt 1011 of dill pi.wt rp.iu i iprnonto of St-f).
Suction 10-P «, TM1 action plan, NUfil (j-Oi&rfbd, ] turns II B 4
All litent-etl operotors rutc-ivcd ti»ining Por deQrddcd core
conditions
BYLVIA.B R Vtrymia Eiuftrn t. POUIPI <o no/n//,>4 lp
194
DOO7a90fl30 Submits listing of two proups of items get to be resolved
baafld on rotieu of (.lass IE electrical eqifl Jim-ant
qualification usiticj NUREO-05BB guidance Maihed-up W Tedescn
76022& memo IP Facility equipment qualification enr 1
SYLVIA, B R Virginia Electric !i Pnuer Co &Q/O7/P4 !3pP
B007a003k7 Forwards nonpropn etarij version of WE-sLmghousB Inui pressure
turbine disc info Suppls proprietary info transmitted by
licensee 000715 I tr
SYLVIA. B H Virginia Electrit !. Power Co BO/Q7/35 21cp
BO073an4O6 Forward* current in? till la t ion schedule for NU!(EQ-O(j60 itomE
identified in NUBEO-0694 Discussion "f items that may bo
delayed beyond E3JO1O1 one)
SYLVIA- B B Virginia Electric & Power Co BO/07/25
BOO72H0423 Forwards afldl info r
pressure isolation valves
SYLVIA. B (1 Virginia Electri
7pp
eqiiested re periodic Eeak testing of
r !. Pouer Co BO/07/25 2pp
3007360651 Provides surrrorinj of ipsults o>P Phase E of multiple structure
advance record sgi evaluation of piping *ge difsign Final
detailed rept mill be submitted upon completion of Phase II
effort Category listing attached
SYLVIA. D R Virginia Electric Ji Power Co BO/07/23 3pp
&OO7390700 SurMiariies result;, of Phase I of multiple structure
amplified response spectra evaluation nf JJnrtJi Anna 1 pipina
SIJB design as desmbod in BOOd&i 1 tr Final detailed reft
ylll be lubmittod upon completion nf- Phase II effort
BVLVIA, B H Virginia Eloccrii. ft Pouier Co BO/07/35 3pp
BO0730049B Submits list of addl design data re IDUI head safety
injection pump discharge piping ilress problem, in response
to NRC request Jitn mill be f armflrdEd liu BOO730
SVLVIA, 3 Fl Virginia Electric f. Power Co 90/07/23 3p p
BO&73001B3 Requests that facility be granted Pull-power license u/n
final verification of remaining fJUHEG-OBBB items Items, ull]
perform inteniied functions under atcideni c dud iti oris p end i ng
completion of ongoing qualification revieui
SYLVIA. B R Virginia Electric !. HOUBT Lo BO/07/HB 2pp
BOO/300450 Notifies Uiat oF "IB items identified in r-eeponii? to NUREG-
OSSa.most fall into categories ufiich are used in safeguard's
sij i {i 90X of items are located outside con t.iinmtn t
EV4.V1A.D R Virginia Cloctnt fi Pouior Co BO/07/2H Ip
P0073103fli!i Forwards info in response to NftC qucation9 re applicable
codei fc fracture toughness requirPments for ferrltic steel
parti nf containment pressure boundary not supported h"j
concrete ftild! info re carbon steal plates uill be foruarded
BVLV1A.C R Virginia Eloctnr !, Power Co BD/07/J9 A3pp
800731038'! Forwards info supplementing BQ07S2 design data for 1 oui head
safety injection, pump discharge piping analyaJs Info
includes model of BUS shaulng mat tump conditions uiithin
pipe Et seismic it i sp lat. emento for eatii support point
fiVLvIA, D fi Virginia Eleiti ir t, POUIPI- Co BQ/O7/30 56pj,
0 Inspection reports. IE Bulletins >< correspond en.c
BQ07S4023O Furuiarda IE Info Notice an-SO, "LOGS cf Decay Heat Removal
Capability at Pavi^-IJesae Unit 3 Uhile in Refueling Mode "
No response required
D'REILLV.J P Region a, Atlanta, Office of the Director 6O/05/OB
Hop
B007O30^00 Forward* IE jnfo Notice 60-S3. "Dreatdoune IT Contamination
Control Programi. " No urltten respnnBe required
D'HEJULV,,! P Region 2. Atlanta. Office of the Director 30/05/28
IP
B00721Qii77 ForuinrrtH IE Circular 30-1:3, "Grid Eitrap L>amag« In
Me sting house Fuel rts'semblieo " No written response required
O'FrEll.LY. J P Region 2. Atlanta. OfFic* nF tne Director SO/OS/BH
lp
B007O10239 Forwards IF Info Notice 90-23, "LOBS of Suction to Emeruencti
Ffleduater Pumps " Ho uritton rcBjinnse required
Q'BEIUY.JP Htginn a, Atlanta, Office of Hie Director BO/09/29
— B007160743 IE Insp RcptS 50-338/00-23 t, SO-339/QO-33 On B0031S-I5 No
noTitompl ionco notetf Major areas inspected aelinli. analyii*
for as-built saf otg-rplatcd plpinu BIJH (" licensee actions
an. licensee identified items
CDMPTCfJ.R M Region 3. Atlanta, Office of the Director
HERDT.A R Rogion 2, Atlanta. Reactor Construction tc Englneerinn
Support Branch BO/O6/Q4 5pp
B007220066 Foruiards re Info Notice BQ-Stt, "Evaluation of Contractor
UA Prosrams " Ha written response reduired
Q'REILLV.J P Ktgion 2, Atlanta. Office of the Diractor 00/O6/1O
3pp
Q0071 60307 ForuarilE IE Info Notico 90-27, "Degradation of fliractor
Coolant Pump Studs " No Bpeclflc action or reipome
reciu ired
Q'REILLY.J P Kogion P, Atlanta, Office- of the Director 00/06/11
E30O709O037 Forward s revision to Page S of &OD611 reiponte to IE
Bulletin BO-12. "Dacay Heat Removal 9us Opornliility "
SYLVIA. B R Virginia Electric & Pnuer Co 80/06/16 2pp
HOO70B0787 Foruiards IE Bulletin HO-15, "Possible Loss of Emor||oncg
Notification Qgs (ENB) W/Lnti of Offnite Pouer " Written
response required
O'llEtLI-Y, J P Region S, Atlanta. Office of the Director 00/06/10
SOO7030434 Forwards IE Cneular BO-1 5. "Loss of Reactor Coolant Pump
Cooling t, Natural CirLulatioti Cooldoun " No urittin rnsponit
required
O'REILUY.JP Region S, Atlanta, Office of the Director 80/06/20
BODV17D117 Forwards IE Circular (30-11. "Radinactive Contamination of
Plant [lemineral i sed Uater SIJE t, Resultant Intarnal
Contamination of Personnel " No turitten response required
O'FiEILLY.J P Flogion 2, Atlanta, Office of thu Director 00/06/34
IP
6007010413 Responds to IE Dulletin 79- M, "Ssiamic Analysis for
As-Dullt Ba feti; -Re la ted Hipinp 3ij* " Const uinrk complett on
Unit S Estimated completion date far Unit 1 it BOOO31
BROHN.0 C Virginia Electric & Pouer Co QO/06/27 3pp
B007230270 Formarif* IE Bulletin BO-lo, "Potential Misapplication of
ftosomount: Inc Models 1151 ti 1133 Prfiaiur* Tranimitters
W/Either fl or D Output Codes " Writton responau required
IE Circular BQ-16 nlon one 1 No writton i-BBponso rnquived
D'REIL-LV, J P Region 2, Atlanta. Office of the Dimctor BO/06/27
H007160745 ForuiardB IE Inap Ropts SO-33B/BO-31 t. SO-339/BO-24 on
800611-lil No noncDinpliancc noted Details withheld
Cm* 1QCFHS 790)
KENNA, W R n»elan *!. Atlanta, Safoguarde Branch BO/07/01 lp
-~ao071ti07c,l IE Intp Rept» 3!)-33f3/BO-24 i, 30-339/BO-24 on B00611-1B Ho
noncomp lianco noted Major arnas inspected vital arna
liarr leru, aearchofi t< vital area BCCDES Detail!) ulthheld
(rof 10CFR2 7TO)
OILLE6P1E.F P Region 8- Atlanta, Safeguards Dranch TOBIN, H J
Region 3, Atlanta, Office of the Director (30/07/01 lp
SOO70703B3 Forwards response to violation naUd in IE Insf Rapts
5O~33fl/0D-Sa d 50-339/80-13 Corrective action* review
conducted of test control program ti station mgt will
distribute Itr ro periodic te&l schixtuling rBquirnmenl*
SYLVIA, B H Virginia Electric !< Power Co BO/07/03 2pp
000717oaa4 Fortiiaril* repta submitted in reponse to action required bg
Item 4 of IE Bulletin BO-11, "Hasonru Mall peslpn " fieptt
prepared in compliance u/Dulletin requirement for
• ubmlttfll of iO-diiy 1-upt
R Virginia Electric t, Power Co BO/07/07 SOlpp
B007230545 Forwards response ro IE Dulletin BO-OB, "Ejism of Containment
Liner Penetration Welds " Penetration assemblies of fluerf
head forging design u/ero UBHI) for penetrations listed in
Tables 1 fc 2 for Morth Anna
SYLVIA.B R Virginia Electric (. Pouer Co SO/07/07 7pp
FovuraidS It Inip Repts SO- -
NP non(.nnipl»anCB noted
E Reoion S, fltlant.i, Rom tor Construe tlon I, Engineering
Biipport Dranch 00/Oh/OS Epp
0007270630 Responds to IE Oulletin OO-10 re contamination of
nnnradioae tivo BUG Lists ayn cnnnidered nonradinactive but
pobuntialli; radioactive through interfaces U/rad ioactiv*
SIJB All discharge paths arc sampled or monitored
BVLVIA.G R Virginia Electric & Pow&r Co BO/07/07 3pp
Responds to Items 2 t, 3a of IE Dulletln 79-27. "Loss of Non-
Clani IE Instrumentation t. Control Power Bgs Bus Duritifl
Operation " Unit 1 inverter trip iuai not related to failure
nodal described in bulletin
BVLvIA, B R Virginia Electric (. Power Co BO/07/09 Bpp
BO071SO671 Responds to B00630 telcon re commitments ma do in response
to IE Dulletln 60-06, "Engineered Safety Feature (EBF)
Reset Controls " Submits Info re protection st)C design
eonforiaanee w/Itemi 1.2 & 3 criteria
BVLVIA, B R Virginia Electric V Pouer Co BO/07/ 1 1 5pp
BO07230447 Forwards response to notice of violation Item reported in
IE In«p Rspts 30-338/80-35 & BO-339/aO-Si& Infraction i6 not
correct as stated Point-by-point rebuttal provided Insp
rapts contain no proprietary info
BVLVIA' B R Virginia ElBctrir fc Poiuer Co 80/07/18 2pp
R Periodic operating reports h related corrBsponoenco
8007140989 Part 21 rcpt i-e con taiT
current protection ilaviiBE Biv
to valuBG bplciw thermal limit Devices UJH r n
adjusted to protect penetration*
H1LH.P A StniiB t. Hotinter. Inc BQ/O7/O1
eloc ti ical pen* trot i fins fault
ould nut limit turrunt
s UJH r n changed or
4pp
BO0714O&01 Part 21 rcpt re Colt Industries diesol generator battery
rack* uhieh do not meet seismic dPEign criterion Inadequate
components replaced to meet design irlturirm
UlLO.f f, Stone I. Uobstor. ini BO/fivVOl 4pp
OOO7O7O3SS
on mains tifam
pump reotorod
s LER fTO-
Virginia Electric »< POLJI
— BOD7O7O363 LEfl Bt>-Qlfi/l>3L-0 an aOO6O7, dur i FIQ hot s ta'idhij . ateen supply
to steam driven aux i 1 lory (eed mater purap WOE inolatod
Cauaod bu. attempt to repair tap to body i sa fc
check valve VnSve repaired ft sti'am fliJpplu t
CftRTWHIOHTiW R
Elpctrit 5. Pauer Co 1)0/07/03 2pp
B00732O431 Forwards monthly operating repts for June 19BO
BVLVIA.B R Virginia Electric fc Pouer Co QO/07/15 lp
HO07O7O371 roruia
CARTUfllOHT, W R
s LER QO-oa?/OlT-0
Virginia fclectrlc fe PouiBr
lp
-B007S2043& Monthly operating rept» for June I9BO
MADISON, W R Virginia Electric t, Power Co BD/D7/O9
8 Reportable occurrvncesi LEfls b related correspondence
— B007O70379 LEO t!0-039/O(T-O an 00062^. dur I ng Moile 3 operation, pow»r
operated relief vfllve- PCV-31Hfc ofionifil Inadvertantly t. fallod
to reclose Caused bij rackr-d bearing in valve actuator
Upatroam MnV-2fl33 cloaed to terminate reliuf Plow
CARTWRIOHT. U H Virflinia Elsctnc t. Pnuar Cu BO/07/O2 2pp
8007010333 Forwards LER BO-OBI/O3U-0
CARTHftlOHT, H R Virginia Electric fc Power Co
000/0*70396 Forwards LEP, ao-O37/O3L-0
CARTHFUGHT. U R Virninla Elsctric
— 8007010379 LER HO-OSJ/03L~0, on 8O0304. Jurinfl Mode 3 operation, leading
valve on radiation monitor RHB-2S7 resulted In low floul to
monitor Ccgsed by routine failure of valve bonnet Haw
valve bonnet installed,
CARTUfUGHT.U R Virginia Electric & Power Cb BO/06/24 3p|>
— 3007070304 LCFt BO-O27/OJL-0 on QOOAHOi lu/oni t at Btnrtuf cund 1 tiun, on(
main •Eteom Tloiii transmi t tiir found i imp &pnb 1 o Caused l:y looie
connection., renul tiny Prom stripped airinu Bcrou TBploroil,
conne-ctlon ttgh toned ti transmitter tnllbr
CABTWRIOHT. W R Virainia Electric R Pnurr Co 00/07/03 lp
800701039B Forward* LER BO-02B/WT-0
CARTURIBHT.M ft Virginia Electric «c Poui»r Co
C007O7030H Poruord
R
Eleetrir (. CDI.
Co 110/07/03
— B007010419 LER BO-02a/99T-0 on BOO&24., during beglnnini) of c ore lite.
hot xero moderator temp coefficient Pound morr positive than
required Caused by podtive moderator temp cosffUient
di»cov*r*d during startup physics testing
* Virginia Electric !> Power Co 8Q/O6/3& 3pp
— B007O903I2 LEH HO-O2E/O3L -O an B00^>09. u/p lant in Modv 3i contalnmint
nump FJouj indiiBtDTi FTO-UA-S1 3* stiippnif meflr.iiriiio Flou
correctly Caused by clugaed itiiilrinr lOLfitort mithin
iTistrument. nruvenl i ng prupor rotation of flnui ncnaor
CAHTWHJOHT. U H Virginia CU-ctric (< I'nuior Co B(VO7/02 Spf
B0071104SO RD-HO-029/01T-0- on 800427, presiuri rer power oporated rellaf
Valve PCV-B436 Inadvertently opened In Mode 3 falloutno
valve niaint •ctlvltles. Corrective action will bt taken
ptndtnp completion of invastigat Ion
* Virginia Electric t Poutr Co BO/Qfi/27 lp
B007O302&2 Forwards LER BO-024/01T-Q
CARTHRIOHT.H R Virginia Electric E. Power Co
B007070317 Fnruarils I ER BO-026/O11 -0
CARTWH10HT.M R Virginia Electric
Power Co 00/07/0
B007090J23 I ER BO~02f]/03L-0 on BOOdPO, w/reac tuf in Mode !! & ns pnrt
S-BU-31. channel r- "W7 was obnorved to require adjustment In
ordcv to IniuBr Ptied mater flou indication Caused by rero
shift In multip li*i — diviflor car A of Pueduotcr thann-ol F-497
H Virginia tlpctrn. ft Pouitr Co BO/O7/03 P.f p
— 0007030867 LEH flO-024/OlT-O an B00il9. during 1 DID power physics teitinfl
in Mod* S. discovered tfcat main feeduater flow transmitters
FT-47ii 477* 1B7, 49* b ^97 w»re Isolated Cause could not ba
determined. Transmitters volved in h returned to avc
* Virginia Electric fc Pauor Co BO/O4/30 3pp,
B007030H73 Forward! LER BO-017/03L-0
CARTWR10HT,H R Virginia Elactric !< Power Co
— B007030S7S LER HO-017/03L-0 on BOOiOl. Inner contnlnment hatch door
leaked air past seals during test performance Caused by
dirty laals Baals cleannd h air lock tested satisfactorily
CARTWRIflHT, H R Virginia Electric & Pow»r Co BO/06/30 2pp
B00709O33b FuruiHrils LLR 00-011/O3L -0
CAHTWRtOHT.W R Virsinia bloctric tc Poiuor Co
Ifl
— 800709O342 LEH BO-0 14/OHi-O on UOO-bOfi, BmorB«ncy tfiesel DOiierator
removed from svc for r uplnc oment uf trnnu FormBi- Cnuanil b u
fail-Bd trnnsformur Tronaftirmur !< ri'lag roplaccd
CA.F1TURlGHr,W R Virginia Electric t. Puu*r (-0 130/07/02 2ji p
B00721009E Par t SI rept ro mistpncu of nancflnsDrvntl vn astumption In
cold shutdown do-sign basin boron dilution flccitiont analyslt
in FSATl Caunsd blj U»B of incorrect ays vo 1 RovlifW will he
performed to iilirntlfi] t jnalg in aid! ittc. Id^ntc
BVLVIA. D R Vli-alnla Electrir t. Power Co (JO/0//OH Ipp
B0070302B1 Forwards LER 80-019/03L-0
CMTHRIOHT-H R Virginia Elactric b Power Co
R007ltO309 Forwards LER B»-030/03L--()
CAHTWniQHT.W SI Virginia Elertrir t- Pow»r Co
lp
— -B00703O8B3 LER BO-017/03L-Q on 800602, radiation monitoring channel RM-
flHS-259 uit valved out a« Inoperable due to insufficient
flou Caused blj pump failure Pump removedi rebull t l< returned
to iVC,
CARTMRIQHT.U R Virginia Electric b Pouiar CD 80/06/GO Hpp
— B007140329 LCR nt)-O3f>/C-3L 0 on eoaftB4-2Sj on throB nccn» i ana, r ai
poaitipn indlrdtian diRanreeit morn than 1.3 Bttsp* batueen
individual pusition t, demand pusition Caused tiy InRtrumant
drift For eaih evonti SIJK re.ilioned tj returned to owe
CAnTURIOHT.U H Vlrglnln tli-ttrn (< Power to HO/O7/O7 Hpp
B007030SBS Foruards LEH BO-01B/03L-Q
CARTHRIOHT.M R Virginia Elactric d Power Co
B0071BOBOB Foruiarrte LEF) aO-
CARTWRIOHT.H R Virginin ITlectric t< Pouet Co
--B007030SBB LER BO-01B/03L-0 on 800602. loss of C rastrve station svc
transformer occurred rendering C normal ntation svc ti SO
Intake structura biiEt> inoperablt Caused bg open breaker*
Emergency buses envrglied & breakers cloned
CARTURIOHT.H R Virginia Electric t> Pouar Co, BO/07/01 Bpf
— B007150819 LFR RO-023J031 0 on B0061O.A LCCS lubeys umi r«n<l»r»ri
inoperable by isolation of A LH'il pump CKUted by nee 4 to
repair leaking water Pitting Seal water fittingii reinstalled
d pump returned to svc
CftBTWHIOHT. W H Virginid Gli'tbric d Power Co BO/O7/07 2pp
6QQ7t9QB10 Forwar
CAH1W1ISHT H B
H <"»-°jjJ'°II:?
rgin. 3 Electric
er Co BO,07/O7 »P
er
QQ071MWI7 FOPuwidi P'»« lotion 0 •*'»•
COLBERT. H f l>.trnil tdiaon to 00/0//OII
i««4 R»r-; -a--iL^^,;op;:::"r^;;;i"r:-;!
SS! S'^K.!! 'r^Ub^MM.-. ..... , record ,-„..„«.„
in cu.ifcrmaiUD w/l»t.nt af
»ieRUODD.0ff O-n"1-"' ri.c
///Ul/l/ -IpP
ao07220iOI Forwar
CAHTMRIfiHT.H R
s L£R s°
Virgini
position indicator channel Channel rucaUbr
CAHTWUGHt.H R Virginia Electric t, Poutf Co
ao/o7/17 Ip
t« Power to PI»
BO/07/ 1 7
B00717034B Forwards rev. sed. "Licensed Operator ^qualification
PrnBTa™." m TBlpEnse to NRC S0033B r»4u«t AH tvainma
instructors are required to participate in proBram to
nalntain proficiency „„,,,-,, .c i,,
B'YLVIA.B B S»iTB»ma ElettTii t. POUBT Co BO/07/IS ip
—9007170390 Revised, "Licensed Operator Reunification Program "
* Virginia Electric I- Power Co BO/O7/31 Upp
8007250379 Informs of completion of full power requirements 0* CER.
Section 10-2 & TMI action plan,NUREC-0660. Items II D 4
All licensed operators received training for Degraded core
H Virginia Elrctric t Power CD BO/07/S4 Ip
DOCKET 50-340 SEABROOK NUCLEAR STATION. UNIT
C ASjudicatory currespondBnce
B007310243 Foruiardi commlSBion 300927 memorandum & order containing
d»cismns on UCS 7H0502 petition for r ei. on* f deration of
7S0413 mpmorani/um t> order UCS 77IIO4 petition sought action
re fire protection tar electrical cad IBS
EIS6NHUT,D 8 Division of Licensing. 90/06/23 B°Pp
.
In B»t*e»iJfl.MU to dlncuD. rDr,L«nllirt po.tUo
LicBimlliii R«vUw (Jpuup on ICDB opHi l»i"«»
N Uctn.inB Bi--«rh 1
"tvl*w
0 Adjudicator^ coi r*»pondt>i>eif
3007110343 Forward* C<imml.»i(in 1100937 m«m,ir*in)»n. l> order eontalnli
decision, on UC(1 7«0»OJ petition fur recoinld. ration of
7D0413 momornnifum f. ord«i- UCfl //1 104 petition »«ught «ctlon
vo fire prote.t.tlon for *l»ctrlcjil (.fltilwe
E1136NIIUT,l) 0 Division »f licoii»irlg f)0/tl(i/J!l iivpp
(300710004^ Joint notice of TP WooJl.Bfld ,ipp»»r.nc» ». «l Ill«cli with
Croffl DrocneillriD Curtlflcat* i>C I!*1! ««cl , , .
WOOOtteAn.C t> H.«rlna Branch 'J HI ACH- H I llf*rln« Dr.nch I,
DO/07/03 i'nn
H Ooneral e(trrt«p*m)«nc«
B007030I1I3 flaoiiusts conolderBtlon i)f hnvlrifl Atomic f uvrQi| CiiimeU of
T-luanvl.lt fvtcnitv on £fO«IWH-,"V Council lnt»r*»tiril l'i
oh.frving w««te mgt rtCtlvitles Coop»r* t Inn will lit major
cotitributioti to NRC oicliaiifl* arraignment
LAFLEUd.J D A»»l»tant Director for Interim! lonul Coop«r*tlnn
CO/09/ 1.1 3pp
000739000D nosponili to OOO.I3H Hr from L»U»on,H() irhiiPl »t»Jont« to
President Cnrtur r« ndeqiincy of <|i/«li f t cat lon» of p«r«ofln*l
dff»lfli>lriB i>)iiit Curtdln dealon actlvltlB* f«ll«(l t" »«»*
NI?C raqolremoiito I'tll corrective «illon» under mvleu
CKBiH J Offlcn of I lie I.»ecuUv» Olreetor for t1p*r*tlon»
SO/03/30 ip
DOCKET 90-341 ENRICO FERMI ATOMIC POWER PLANT. UNIT 2
A Application/construction stage documents d correspondenco
B007D30239 Notifiuation of B00702 mBetinfl u/BWfl licencing review group
in B»tht5ils,MP to discuss consensus position on reactor
svc bldg open issue
WlLSON.J N (.itensing Branch 1 BO/Ofi/la 9pp
B007010297 SuWanj of B00613 meeting w/uti! s, KHC, Inc, GE. Dechtot, B1U b
Sargent & Lui>dg in BEthesda<MD re consensus positions on
r*a£ti>r ivc blitg & isolation cooling njs bldg open issues
froifi La Salle Jacket Status repts sntl
. JN Assutant Director for Licensing BO/06/19 4opp
P Onerflting liciin** .Lags ilorum»ni« ^ torr»«i)und*ntii
0007230030 Bummflrv of 1)00307 tnavttfls u/Hert I own»ri aroup 10
tlD.re r»vlil<iiiii to NflC acceptance (ritrrl* b (iiJt»t»niJlna
l«)tie. relative to Hark I (.(intfllnnurit lun(-t*r« prwurfl""
ORJMEB. C T 1'lfliit Uy«ttm» Hrnnch HO/OW/Kt ;ilpp
lon 1-eportH' IK Dullnlln« i corfeip(i»d»nc»
8007140310 Foriuai'rtt 1C Bulletin UO-lCli "CrflCUnfl In fior» Bpray
8p#rgiTi « No ujrltfcun r**pon*e
BtfPI-ER.JO H»Bion ;t, CliHafl
IP
B007230O01 Horuiards slatEsient; of policy re requirements to be met for
current DL appl ications. as derived from NUREG-Q64Q fe fount
in NUBEC-Q694
, D 0 Division of Licensing SO/Oi/26 2pp
B007H03S7 Foriuaril* 1C Itullitin BO-13. "CrueUng I" Cor* Bpr»U
BpoT|)»ri " No written roBponn rtiuirtd
KEpPLERijO rteflloti D. Ctiltajfl. Office of th« Dlr»ctOf 00/0">/ia
IP
80071703J9 Notification of rescheduling of 800702 meeting U/8WH
llccnting revieui group in Gethesda, MD to discuss cOnttsrisut
positions on Radctor Sya Branch open IESUSS Meeting
i-est)i"dglBif for H00709
Ni JN Assistant Director for Licensing BO/07/03 Ip
8007170347 Notification of S00723 meeting u/GWP litonsing T*vi»u group
in Dethesda.HD to discuss TMI issues required for QL
muance
WILSON. J N Assistant Director for LlcennnB 60/07/03, Iji
30071703S1 Nntificfltion of B00724 meeting w/DHR Ucenitng r»via
Irt BethesdSiW) ti> mtroniice DWR licensing reuleu group t
prasenl consensus positions for Power SyP Branch, Containment
Sat Branch fo Equipment flufll I f itatinn Braiich
MILSDN. JN Assistant Director for Licensing 80/07/03 ^p
nrnup
B007010107 Forward. 1R Info Nolltw 00-an. "l.n»« of Suction to E»»rs»neu
F*HiwatBr Pump* " No written rttpnnce roiulritd,
HEPPLER.J 0 H&aion a, OhltflB"- Oftttt of th» Dlrdctor aO/09/K9,
IP
B0070200Q1 At* receipt of HOOBIIJ Itr informlnfl MIC Of »t»p» t»N»" *»
correct vlnlitlan notod in IE Inap niipt 00-341/00-08
FIOBELUiO Hoiitm 3. Chlcflflo, J)»actOf ComtriiG t ton b BnBlrmtrlnj
Support Branch SO/06/09 tp
B0072S0198 ForuarJa lh into Notlt* BO-Sli, "Evslujltion of Contr«etor
OA Progrnm* " Hu wrlttnn r»»pon«» renolrfd.
G Hngion 3. Chlrano, Officn of th* Dlfectttr fiO/Qbfta
BOO71 40333 Forwards IE Bulletin 00-14, "Degradation of BWFi Scram
Discharge Val Capability " No written response required
KEPPLER, J 0 Region 3, Chicago. Of fie a of the Director BO/06/1S
B0072BO644 Forwards IE Info Notice BO-2B, "Prompt Reporting of Info in
Accordant* H/1QCFR50 S3(e) " No written response required
KEPPLER, J 0 flegion 3. Chicago! Office of the Director 80/06/13
lp
8007230O39 Forwards IE Insp Rept 30-341/BQ-06 on 000430,0301,02 t,
38-30 No noncompliance noted
FIQRELLI.O Region 3, Chicago, Reactor Construction t Engineering
Support Branch BO/O6/17 2pp
— 8007230066 IE Insp Ropt 30-341/BO-Oi on 800430, OH01 , 03 fc 88-30 No
noncDinpl iance noted Major areas inspected action on previous
imp f indingsi organiiation & daslgn change control
KNOP.fi C , BARRETT, P A Region 3. Chicago, Office of the Director
BO/O6/16 6pp
BOQ7O3Q359 Forwards IE Circular BO-13, "Lo*a of Reactor Coolant Pump
Cooling b Natural Circulation CoDldown " No written response
required
KEPPLER.J 0 Region 3. Chicago. Office of the Director BO/ 06/20
BOO71704Bi Forward! IE Circular 60-14, "Radioactive Contamination of
Plant DemineraHiod Mater Sys & Rcaultant Internal
Contamination of Personnel " No written response required
KEPPLER, J 0 Region 3, Chicago. Office of the Director BO/06/24
IP
BQ07140470 Ac* raceipt at B00609 Itr Informing NfiC of stepn taken to
correct violations noted in IE Insp Rept 80-341/79-33
FIORELLIiO Fti-glon 3, Chicago, Reactor Construction & Engineering
Support Branch, BO/06/29 lp
— B0071404B1 Responds to NHC B00384 Itr re violations ncitod in IE Insp
Rnpt SC—341/79-25 Corrective actions controlling procedure
to notify QC personnel of needed pipe weld repair hai been
revised
HINES,E Detroit Edison Co BO/06/09 Spp
8007330323 Forward* IE Bulletin BO-16, "Potential MUapplication of
Roxinount Inc Model* 1131 & 1192 Pressure Transmitters
H/Eitoer A or P Output Codes " Written response required
IE Circular HO- 16 also end No written response required
KEPPLER, J 0 Region 3, Chicago, Office of the Director 80/06/37
6007140423 Forward* "Summary Rept Number EFH-49i 437 of Response to IE
Bulletin 60-03," in reiponse to IE Bulletin BO-OB, "Eiam of
Containment Liner Penetration Welds "
HINEB.E Detroit Ediaon Co BO/07/07 9pp
B Heportable occurrencesi LERs & related correspondence
S00707O09S Ach receipt of 800605 Itr ru Final deficiency rept on
Agastat relay base problem
FIQflELLIiQ Region 3, Chicago, Reactor Construction & Engineering
Bupport Branch BO/04/17 lp
--8007O7Q09B Interim deficiency rept m Agattat rclag base problem
Subsequent investigation revealed that relay base is alia
used in five addl OE panels Final rept will be foruarded by
aOOB06
FAHRNER.W J Detroit Ediaon Co 80/O6/05 lp
B00717049B AcV receipt of 800613 final deficiency rept re defective
Wditlnghouse switches Final rept encl
FIORELLI.G Region 3, Chicago, Reactor Construction & Engineering
Bupport Branch BO/O7/01 lp
80072101SS Ack receipt of B006I2 interim deficiency rept re nonBBiiinic
equipment installed over seismic
FIORELLI.O Region 3. Chicago, Reactor Construction tc Engineering
Support Branch 80/07 /Ol lp
--8007S10136 Interim deflcioncu rept ro nonseismic equipment installed
over seismic Affected equipment includes piece* of heating.
ventilation * air conditioning ducts in reactor & auxiliary
bldgs Final rept to be submitted by BQ0913
FAHRNER.W J Detroit Edlnon Co 80/06/12 lp
8007140326 Final deficiency rept re damaged penetration assemblies at
facility Problem assembly engineering evaluation completed &
changes made tt> penetration X-l' Bellows life not to be
reduced below design specs Bellows have been leak tinted
FAHHMER. W J Detroit Edison Co 80/07/02 lp
8007170406 Final deficiency ropt re problems in/terminations to
receptacles in main control ruum Panel* 601,602 !. 603 OE
investigation complete Problnm* caused hy improper crimping
Pull~tB5tB uill bo performed to assure sati sfactnry crime*
FAHRNOI.U J Detroit Edison Co BO/07/03 2pp
BO0731000H Ack receipt of E0061O final dffflciencij rept re seismic
Category I instrumental! on ». control tostinfl
F10HELL1.0 Region 3- Chicago, Reactor Construction t< Engineering
Bupport Branch BO/07/O3 lp
BQ07220345 Interim deficiency rept re notification by Cnmsip Of pump
malfunction on similar containment gas monitoring eya
Caused by deadhead ing< resul ting in excessive presstiro
Vendor has agreed tu provide Kit for adding 6tj-paai
FAHRNErt,H J Detroit Edison Co BO/07/10 lp
DOCKET 50-341 TROJAN NUCLEAR PLANT, PORTLAND GENERAL ELECTRIC
F Security, medical, emergency !< Fire protection plans
BQ07180196 Forwards NRC B004H5 ttr to all power reactor licensees, in
response to 80033? Itr re emergency response Facilities at
reattor sites Sites ui/approval to use closed-circuit
television link w/technical support ctr listed
CRUTCKFIELD.D M Operating Reactors Branch 5 80/07/07 2pp
80070103afl Forwards comments on proposed rule 10CFRSO re five
protection program for nuclear plants Proposed rule is far
too vague far effective Imp lamentation, lac k ing definitions
in particular Rule is subj to individual interpretation
GOODWIN, C Portland General Electric Co BO/ 06/27 lOpp
B007090300 Forwards draft App 1-E, "Description of Public NotificatiDn
Eg 5 for Trojan Nuclear Plant." for radiological emergency
plan procedures manual Revioui of adequacy of alrens in sys
requested Draft d drauings available in Central Files only
OOODHIM, C Portland General Electric Co SO/Q7/01 Spp
8007UOS29 Notification of B0072S meeting ui/utll in Prescott.OB to
diocuss results of NRC emergency preparedness review team
analysis of util BOOS 16 draft radiological emergency
response plan b to conduct alto tour
Tf?AMMELL,C M Operating Reactors Branch 3 BO/07/07 2pp
0 Adjudicatory correspondcnc e
8007100031 Discusses licensee B00319 rvpt re inadequately connected
uall tt forwards DJ Droehl b WH Whito affidavits in respontB
to 000602 order Issued in control bldg proceeding
JOHNBQN, R M Portland General Electric Co BO/06/16 Spp
— 3007100058 Affidavit re LEU BO-007/01T-0, describing cause of auiiliarg
bldg uall inadequate connection Si eitent of deficiencies at
top-of-uall interfacBE Identifies manner & schedule of
corrective action Description of deficiency encl
BROEHL, D J Portland Oonoral Electric Cn QO/Ofe/16 fpp
— BQ07100063 Affidavit describing limited slgni Ficanco of auxiliary bldg
mail connBctlon deficiency as related to structural ndequicy
of complei, before tt after completion of corrective actions
Certificate of Svc encl Related correspondence
WHITE. H II Bechtel Pouer Corp Isubi of Dechtel Corp )
WHITE, W H Portland General Electric Co BO/06/16 7pp
8007310243 Forwards Commission BOQ53/ memorBntfum i order containing
decisions on UCB 7BOSOa petition for reconsideration of
7Q0413 memorflndum 6 order DCS 771104 petition sought action
re fire protection For electrical cablet,
EISENHUT.D 0 Division of Licensing UO/06/23 B9pp
8007020394 Affidavit in response to IE Info Notice BO-21 re control
bldg proceeding Licensee will tonduct systematic insp
program for Rnf nty-rnlated electrical equipment supports t"
anchorages, ui th in IS months
BROEIIL.D J Portland General Tlectrtc Co 30/06/27 6pp
B00710001? Forwards licensee 300628 Itr to Region 5 documenting
resolution oF wall problem re control bldg proceeding Util
program mill constitute full compliance in/Region 5 B00417
Itr re action requirement Ceitificate of flvc encl
JOHNSON, R H Portland general Electric Cu BO/06/30 4pn
8007300333 Forwards Hat of requests for design changes ra mod program '
In "Rept on Design Mods for Control Qldg, " PGE-10SO ABLB
will be informed of attivitios per 790330 prehearing |
conference Certificate of Svt encl Rel^t'ed correspondence
MCCAHREL.a F Portland Goni-ra] Electric Co 80/07/03 Ipp !
8007300357 Notice of appearance ft substitution of counsel in proposed
amend For storage pool mod proceeding Certificate of BvC
ene 1
QSTRANDCR. F H Oregon. State of 80/07/03 Epp
B007100029 Forwards R Clark BOO7O3 Itr to util transmitting IE Bulletin
GO- 11 ti seeking util response to Items 2 b & 3 re masonry
wall design problem Action requirements are no different
From actions stated in control bldfl proceeding record
GHAV, J R Hearing Branch 1 BO/O7/07 Spp
— SQQ7100031 Transmits IE 8uij.eiin BQ-1 1. rankest ing response to Item* 2 b
ti 3 ra dealgti criteria for uia 1 1 3 & long- torn confirmatory
test program ui/assnc iated completion schedule BuflSeBtB
specific items for test program
CLARK. R A Licensing Branch 3 00/O7/O3 3pp
B007290789 Initial decision modifying QU immediately Eiceptlons ai»i b*
filed uithln ]0 days. briefs within 30 days & supporting or
objecting brief B within 30 days or original brief! Decision
shall constitute final action within 43 days
PlCCOLLOM.K A . PAXTDM, H C . MILLER-M E Atomic GafBty and Licensing
Board Panel BO/07/11 BOpp
B0072S-0303 Forwards State of flR Dept of Energy re-pt re util isiufta
related to Mount St Helens Based on repli Energy Facility
Siting Council denied petitions to revoke site certificate
DIXON.D Oregon, State of BO/O7/14 IBpp
H General correspondence
BOO7300364 Advlson of mithdraiul SB counsel for Btflta of CM in mat torn
re Facility Requests that namo be deleted from NRC flnneral
• vc list for docket d replaced la/name of I~H Uitrander
BANDVIK. R H Oregon. State op 00/07/03 Ip
P Operating license stage documents & correspondence
8007830099 Requests submittal of proposed Tech Spec change* providing
for redundancy in decay h««t removal capability in all otnifoa
of operation Model Tech Specs which would provide acceptable
resolution enc 1 for guidance
EIBENHUT.D Q Bivinion of Licensing HO/06/ 11 4Epj>
8QQ7B5Q7CS Forwards plnnt status re masonry will problem fc activities
re Mount St Helen* Meeting has been scheduled in DefchBBda.MD
for 000616 to discuss NfiC petition ra acceptability of plant
startup
NOVAK. T M Assistant Director Cor Operating Reactors 80/OA/13
S007020Q21 Notification of 800619 numtitlfl u/util in Beth*«ddtM0 to
discuss status oP resolution of IE immediate action Itr r«
double uytjie heavy weight tlocli iualls & cansidoration of
walls not cavereJ by Itr
rflAHMELL-C Operating flaactors Dranch 3 BO/O6/17 Bpp
3007330423 FprwarJs NIC notions For extension of time to Pile
exception! tn ABLB B00711 initial decision t, other related
requests WRC uiJ 1 1 issue license amend per rtSLD order issued
u/initial decision due to desire to restore EBisfflic margins
ORAYi J R Hearing Branch 1 BO/O7/23 Spp
QQQ70SQ2BQ Forwards sefoty evaluation re pontulated funl hantfllnjg
occldDnt inside containment Specific equipment mod* or
revised refueling procedures arc required to assure
potential conaequences are uithln guidelines
CLARK, R A Operating lleactors Branch 3 BO/04/17 3pp
—0007350433 Notion for 10-dflu oitension to File exceptions to ABLE
800711 initial decision authoriilrg control bldg modu.HRC
panition re taUng eiceptian* is dependent upon ASUD action
an encl motion fur clarification Certificate of Svc end.
GRAY. J R Hearing Branch 1 30/07/23 4pp
— B0072B0437 Motion For clarification at ASCII B007JI initial decision
authoriilng mads op control bids Requests ASLD Intent <••
Cam) ill on S C 11 conc-ernino restoration of originally
intended design margins Certificate of Svc encl
QffAV.J n Hearing Drancli 1 8O/07/'33 7pp
3007300481 Fnruartfs motion for reconsideration of initial decision,
ntmorandum of points & authorities in support of motiDn for
reconsideration & proposed findings of fact & conclusions of
law TV design mods for control bldg
OBTfiAMDEB, F W Oregon. State, of BO/07/H3 Ip
-B007300490 Motion for re consideration of ABLB 0O0711 inltUl declnion
Decision does not provide ASLB findings, coinclusions tt
rulings on snatl issueit in State of DR BO05I9 proposed
findlngg of fact tt conclusion* of law
03TRANDER.F H Oregon. State of BO/07/23 Ip
— 6007020290 fiafotv evaluation ve postulated fuel handling accident
Inside containmnnt
* Operating Reactors Branch 3 BO/06/17 &pp
— 800703O394 Suit able Tech Qpecs for initallatlon at charcoal Plltori on
purge eihaust sy*
* Operating Reactor* Branch 3 30/06/17 Spp
B(X)70104lfi Forwards list of dnsign change requeits for mud pragi-am
described in PQE-1Q20. "Kept an Dasign Hodi for Trojan
Control Bldg " Piping support mods will not rvdure shear
capacity of major mall* by more than IX
MCCARREL.S F Portland General Electric CD 80/O6/R3 4pp
80O71A036B Foruard* Amend 45 to License NPF~li safety (valuation fc
notice of issuance b availability
CLARK. It A Oporatins Reactors Branch 3 60/06/27 4pp.
— BOO/160372 Ajimnd 45 to License NPf--li alloulng insertion into ruactor
co-ri -of tun fuel assemblies each containing mai of three
dummy Btalnlees Bteel rod»j for Cycle 3 operation
CLARK. R A Operating Reactora Branch 3 BO/06/S7 3pp
-9007300494 Memorandum of points & authorities in -support op motion for
reconsideration of initial decision Decision dues not
discuss issues raliod in State of OH proposed findings of
fact t< conclusions at laui Certificate of Svc encl
OSTRAWDER.F W Oregon. State of 80/07/33 4pp
8007300500 Propoi»d findinji op Fact A conclusjonB of lau rr design
mod-s for control bldg If ABLD til 1 1 include proposed suppli b
additions in initial decision. appel Jant ulll concur in
licensee proposed findings tt conclusions
OSTRANDEfl.F W Oreson, Qtatff of BO/07^23 ftpp
H007300306 llamnrapidum of point* Si authorities ifl support pf State of OR
promoted findings of fact S. conclusions of law Findings «.
conditions proposed by appellant ulll increase Jitolinood
that mads ulll meet miimii; safety atds
OSTBAMDER.F W Qrejon, State OP 90/07/33 4pp
37300400 Order grantinfl s'tenmon of dste For filins PXCBptions to
\BUB B007H initial decision re mad* to control bldg
Uecutive Lejal Director requested to remind stafp of
lecessity foi compliance w/App A requirements
OWKINS,!! A Atomic Bafatu and Licen«ing Board PaneL BO/O7/S4
tf
— B00716037A Safetu evaluation supporting Amend 43 to Llcetue WF-1
» Operotinn fl esc torn Dranch 3 BO/06/S7 7pp
— 0O07I60379 Notice of i us nance S, uvailabil i t« of Amend IS to Lic»nn«
NPF-1
i R A Operating React or a Branch 3 BO/06/S7, 2pp
8007170390 Summori ics Div of Poiuer Supply fe Reliabilitu views re
alectrlc power sijs reliability imp-lets in Pacific Northwest
t northern CA ahoulri facility outage cit«nd throu|)li Bept
19BO, Oenorati on inadequate for CA Recommends Jul ravieu
HE1NER.R £ Energy, Dept, of BO/06/37 Spp
BOO7070S73 Submits rowised criteria to t>a used in analysis oP out-of-
plane behavior of heavyweight double- uiythe masonry Malls
Includes all masonry walls having safety significance All
niasgnry walla Dili comply u/reviaed criteria by 001031,
DHOEHL.D J Portland General Electric Co BQ/06/S8 23pp
80)07070340 Responds to B00314 requeBt for addl info re adequacy of
station irlDclric distribution BIJO voltage* Responses to
specific questions & plant voltage profile tables encl
Portlrind general Electric Co BO/ 06/30 7pp.
>73101iO Order autjioriunj A8LD to act on merits of State of PR
"tion far reconsideration of ASLB 000711 initial decision
tate of OR supporting brief on exceptions is tailed until
<> days after ABLB rules on motion.
I8HOP.C J Atomic Safety and Licensing Appeal Panel 60/07/38
PP
B007I7047H Forwards rorrocted Pa0e 3/4 1-24 to Tech Spec submitted for
Amend 44 to License NPF-1
CLARKiR A Operating Reactors Branch 3 80/06/30 3pp
— BO071704S3 Tsth Bpec 3 I 3 5 for reactivity control sys
* Portland Qonnral Electric Co 8O/06/30 3pp
B007070227 Forward* adul Info re auxiliary feeduater sya per B00514
request
OQODW1N, C Portland Oennral Electric Co BO/07/01 lOpp
B007210123 Foria«rd» (valuation of control rod guide thimble uioar in
facilities designed by Hestinflhousn Baaed on review, Hsue is
rasolvid
CLASH, R A Operating fleactors Branch 3 8D/O7/OI 5pp
BOO7O703OO Forward* Ltcwnsa Changs Application 62 requesting amend to
Litense NPF-1 Class 111 amend fee b Certificate of Svc end
GOODWIN, C Portland General Electric Co BO/07/03 2pp
BO073003H/ ToruiiiTils supplemental info re <iujllio»<j FooUuster »ya.ln
reapDn&H to Items D S t. C b i n eficl to NUC BOO3 It Itr
Submit tal t amp la ton at 11 rpsji onst-i
OODDMIN,C Poi-tlniid QuiUTal Elm-tric Co HO/O7/23 Bpp
O Inspection reports^ IE llul 3 e t ln= f< (.or roapDTidant o
Submits .idol rc-ap 0115 t to IK DiMlBtin 7rl-OM. Licenced
operator as Elan-erf to control roar" 11 UP ing replaced bij
unlicensed operator trained in omor jonr ij |iroc orturc 5 unit 1
plant Is returned to operation aftBT Spring 17[!l> oi/tanu
FJROEHL, t> J Port land Qoneru] Flactnc Co HO/O4/1A Upn
— HOO7070307 License Change Application 63 requesting amend to License
NPF-1 to Incorporate mods in roactor coolant pump breaker
ouiition inputs to reactor trip logic Proppspd revisions to
Tath Spec Page* 3/4 3-2. -4 b -7 tnr.1
COODUIN, C Portland Ooneral Electric Co BO/O7/G2 App
Ef0072801lJV Fariuards response to IE Bulletin /g-OIB. "Cnvirnn
Qualification of Claeu 1C Equipment " Includes rovlsml
master Jiot oP unginoersd safiitij tea turn ayt, evidence of
anviron ciual 1 fit a 1 1 arts t, list of on t s taiid i ntj ilpfr.aU/n unrl
GUOOHIN.*' Portland Qt-Tiurnl Clctlric l.o BO/03/ If? 2pp
S007390001 Request* submittul of application for amend tn license
con>i>ting of Tech apse changes & llcanse conditions PUR
Hodnl Tech Speo 6 Model licence conditions for TMI-S
Lavioni Lvalned Category A items one 1 Par guidance
EI9ENHUT, D 0 Division o-f Licensing BO/O7/OH 6Vpp
6007090340 Bubmits clarification of BOOilA addl info re containment
purge ays. submitted in response to 00031B request High
radiation signal can ba overridden manually by raising
intpoint or holding reset on radiation monitors panel,
ODODWIN,C Portland Central Eluctric Co BO/O7/03 2pp
S00716D60a Submit* clarifying info re License Chan 30 Application 63 re
modifying logic to reactor coolant pump trip breaker
position trip signal Upon approval, facill ty. will no longer
be vulnerable to reactor trips from loss of vital bu?
ODDDHIN.C Portland General Electric Co BO/07/07 4pp
8007340301 Advism of MRC reorgani lation on S0042H uihich reaultBd in
number of changes in ofc tl ties, positions ti assignments of
personnel Also submits info for GETfi
NOVAK. T M Assistant Dlrnctor for Operating Reactors BO/07/OH
8007160141 Foriuard* Am»nd 4i to Licnnsu NPF-1. safety
notice of imuanc* It availability Related correapan
CLABK.R A Operating Rffactors Branch 3 BO/07/1O
3pp
— 90O71S044B Amend 46 to License NPF-1. changi ng Tech Specs by dolotina
from reactor protection sysi reaetor trip deriVDd from
opening of any single reactor coolant puiap circuit breaker
above 367. power Related correspondence
CLAflK.R A Operating Reactors Branch 3 50/07/10 6pp
— B0071B04S3 Safety evaluation supportiiifl Amend 46 to Lirense NPF-i
* Operating Reactors Branch 3 BO/07/ 1O 3pp
—80071B0454 Notice of issuance fc availability of Amend 46 to License
NPF-1
CLARH.R A Operating Rtactors Branch 3 BO/O7/10 2pp
B007170424 Foruard» interim rept describing r-esuHts of nondss true t Ivo
•lamination of U~benda removed Prom steam generator D Allal
crackc uere detected in cold-leg tran si t ion. at of near
BitradoJ surface
OOODHIN. C Portland Oeneral Electric Co BO/07/11 Bpf
B00730Q047 Foruardl B00617-19 trip rept to Portland, OR (- Mount Bt
Helens re effect of volcanic activity & related phenomena
FEMA bulletin re volcanic haiardi encl
LEFEVRE.H E < JUSTUS, P S OeoBciences Branch BO/07/ M Stpp
8007220570 Forwards list of requests for design change* aaBociateil w/
nod program described in FOE- 1020 re design mods for control
hldg Hods involve piping supports necessary to qualify pipe
s«« for response spectra, Corti fica te of Bvc encl
BROEHL.D J Portland Onneral eiectrlt Co SO/O7/17 4pp
8007 B 304 74 Forwards License Change Application &3 requesting amend to
License NPF-1 Certificate of gvc encl
GOODWIN, C Portland General Electric Co BO/07/52 3pp
—8007230481 License Change Application A3 requesting amend to License
NPF-li deleting portions of ETB covered by EPA controls, per
ASLAB decision re jurisdlctifnal control For establishing
water quality levels & monitoring requirement *•
» Portland fieneral Electric Co SO/O7/B2 Sfpp
BO070SOa34 Foruiarde IE Infn fjotiro !30
Control I'rogrsma " No untltn i eapoi
ENOEI-KEN. R H Region !)•, Don t-rant. l-
BO/03/38 Ip
, "llrBiiloounB In C«ntomiii»tinn
roqi/lrnd
, Offii.o nt the Diructin
BOO731O472 roruianlB reE|)onao to IF Bulletin tiO-03 ro lost, d P
from tray (ulaurber cello I rive '.tl^at idfi& condurtpd pound n«
ovltlenc-B «P cnrbnn cull dallifroB
i C Portland OnnBrol Klpctiir Co flR/Oi/04 4pp
0007330-130 ropixartla IUBUOUSO to til llul]otln HO- li-'i "Decay Hmi I Honnovnl
Bija Operobllltij " In-jtaiicoB oP tamnoriirv dotaij huat remov.i]
doarodatioii Foi Bliui t P-oi lodn hnvo beun rop-ortod I'ruccdin o
devalnpud to pru-viilr yachup itiro h&.it rirmavAl U1/D-C3 apoti
GflDDHIN, C Portlo'lil OoiiDr^i E-loitric Co HO/Ofi/OV flpp
B007300S'/6 flenponilB- to IE JluHetin RO-05 rtf v.-i-ciium Jninooo to thnmlc/il
vol control sy» t.inko All lilnkc y/attlvB Viicuur.i pi ttter 1 1 iin
Jcvicns (i/iVD backup Tout n w/pflssive varuum prntnitlan ul I 1
be provided u/locfclng dnvicc t< onnr.-ivorl u.nnlna
OBODHIN, C Portland OoriornJ El 1 ec IT i t CD BO/Oli/OV 6j> p
ft0072a0241 Foruurds II" Infu (Juttco- HO -26.
QA PrDflrama " No urltton re»pona« roijul
ENGFIKEfJ.n H rtogloti i>, ba\i Frauei-ito.
BO/Oi./10 Ip
linn nf Continttor
(JfFlLfl uP thn
BO071HOSIU HBrommonili thot mit 1 IIZ JnPn Nutlcu (JO-SI, "Anc-liornge l<
Support of Safolil -llolatod rieclnrAl t-qiii pinent • " bu
d Istrihutoil tn appropr i ale Jloriidti ?i portico
EISI-NKUT.U 0 nivlalon at lltnnmnij f JO /Ofc/ If ,lpp
— BOO71BOaao DIHCUBBOH ]R Infu Molito HI) -121. "Am: honip o k Hupport oP
Ho foty-FtiJlHto!! Clpctricnl Enilipment " Written roDp-uimn li
nocouaoTij ninca dcfit i enc ICB 4»iind al other (ilnnf may haw
bearing on uplomic qual 1 f i c nil (in
CLARK. R rt nperritlnjj llcnc tor* llraiuh J BO/0'j/IH Ip
OOO7S503fiO Respo-ndt to IK 3u]letir> 75- Sn, "AtK i b i 1 i ty Pi-utilum
ETICDUTI torcd iin Evacuation of Personmil frurn MtQh Muinit
ATDAB " Ei 1 utiiig ^i/s uii 1 1 bi> inpluLod w/ tmpruvoil in-plaulL
CDmmunicnt i on ne'tiuurk Inturim iriDfliurtiu lolleii
F'oTtlnnil daneral Lloct'tt: Cn tlO/OA/ 1 / Sflp
D00703OOia [uiuardo 1C Dullotiri fiO-I'l. "rnnaidii- I lion of rm«r|)t*ncij
Notification £ii| n CFNIf W/LoaD nf OfFfilts I'otjvr " Writteii
rospont* rcquirod
ENOELKCM,ft K RirgiDn 5, i>an f runt I r.cu. Off It o of tfio [>iraiti»i-
8O/06/HJ Ip
B007OK0470 F;oriuards IE Ctrculnr HO-1'). "I
Cnullng >• N^turiil Cif igla tlun Cnuliliiuin
required
ENOELKfeN, R H noBtnn 9. 'ijn f i nm i ico. fJPflLf nf the
I p.
S up Renctor Conlnnt l'iim|i
Nu wrtlton rnipuiio*
BOO71BO370 Forwards IE fireulrar fif) It. "find I oor t Ivu Curitaninnt Inn (if
Plflnt Demlnernll ipd Uater Fiya & Heairltanl Iiitoinnl
Con t ami not Inn of Pprminnul " No written r^Kpoivoa T v <|ti 1 T r d
ENOFLKEN, Ft H Houton S. !iou fTaniJsro, OffHe of the f
QO/O6/01 Ip
000739063'' Fnllnuo up TtlS'H response
dual 1 f f Cd t ion (if Clae^ 11- f-q.uiiiiTi!»nt
flualificatloii of ASCO -SolcninJ V.ilvo
valv-es aro being replaced
OODDWIN.C --1 ' " - ••-
200
BOQ7S40309 Forwards IE Insp Rept 50-344/80-08 on 800403-1 1, 16-1 B 8.
0806-09 No noncompl lance noted
SPENCER. B 3 Region 3, Ban Francisco. Reactor Construction !•
Engineering Support Branch BQ/Qt>S2t, Sup
—8007340311 IE Insp Kept 90-344y&0-OB on B0040B-I1, 1A-1B t, 030A-O9 No
noncompl lance noted Major areas inspected maint activities
ro pressurizer code safety valves & preparations tor control
Isldj ""all mods
HA I ST. D P . EL.IN.J O Region 5. San Francises, Otfica of the
Director DDOD5, B T Region 5. San Francisco, Reactor
Construction * Engineering Support firanth BO/06/26- llp-p
BQ07010I77 Ac* receipt of 00O601 Itr informing NRC of steps talen to
correct violations noted in BOOH12 notice of violation
NORDEflHAUG, L R Region 9-. Ban Francisco, Safeguards Branch
SO/ 06/27 Ip
B007330390 Forwards IE Bulletin BO-16, "Potential Misapplication of
Rosemount tnc Mod* It 1131 fc 1152 Pressure Transmitters
a/Either A or Q Output Codes " Writt&n response required
IE Circular HO-16 also enc 1 No written response required.
ENGELKEN.B H Region 5, Ban Francisco*. OfPic* of tfce Director
HO/Oo/37 1 p
30Q70W329 Fnruiardi response to IE Bulletin flO-10 re contamination of
nonradioactl ve sija ft potential for uncc-ntrol led relea&BS
Pr-irtiary plant interfaces taetueen radioactive t,
nnnradioact J ve atra enaminerf for cross-contamination
QDODUIN, C Portland General Electric Co BO/07/01 Sfp
I007IS0106 Ac* receipt of B006J3 Itr informino NRC of steps takon to
correct violation noted in IE Inap Rept 3O-344/BO-O7 on
B00414-IB
HQOK.H E Region 5. San Francisco. Fuel Facility fc Materials Safety
Branch 80/07^02 lf>
-B0071501EO Responds to NRC BQ0533 Itr re violation noted in IE Insp
Kept 9D-344/BO-07 on 800414-16 Corrective actions raduaste
program will be closely monitored to insure compliance u/
regulations ti procedures
GDODW1N.C Portland General Electric Co BO/06/ia 2pp
-H0071SOI34 Foriuards IE Inap Ftopt 30-3fl4/QO-07 on fl0041t-18 I. notlcB of
violation
BDOK.H E BBgion 5. San Francisco, Fuel Facility ft Materials
Safety Branch BO/OS/23 3fp
B0071S01H'i Notice of violation From insp
» Region S. San Francisco. Office- at the Director, 80/03/22 Ip
9007150130 IE Inap Rp-pt 50-344/BO-07 on B00414-1H Noneomp 1 lone e ncted
radlatio-n effljent eiceetfed Tech Spec limit d tuastc atoraga
containers not labeled
FISH, R f . HEriSLAWAHI.F A Regjon 5. Ban Francisco, Office of the
Director BIJOK, H E Region 9, San FrancEsco, Fuel Facility b
Materials Sf)fet-(j Branch SO/0 5/32 Ip
D7IB04Q2 flequesta written response Lo Items a b It 3 of IE Bulletin
90-11 within 90 days Design criteria For single uyth« t,
composite L/nlls for cnns idera ti nn af all in-plane/out-af-
ilane loads ahoulri be .provided ti Fully justified
3LAF?Kjfl A Operating Beactort, Branch 3 BO/O7/03 3pp
37300293 Forwards IE Insp dept 90-34 4/BO-1H on S0031fl-16 ND
loncnrapl isnce noted
:REWS. J t. Region 5, San Francisco, Reactor Operations Nuclear
upport Branch aO/07/Oa 3pp
1007300S95 IE Insp Rept 50-^1/80-12 on B005J4-16 No noncomp liance
noted Major iireas inaperfed TO-sponop to ]£ bulletittE b
circulars *i fnlltiuup on pi eviou* infip i tern*
JOHNSON- P M Region 5. San Francisco,. Office of the Director
STBHNDCRB.D tl Region S, San FrantisLOj Reactor Operations MuclBar
Support Branch BO/O^OU 4pp
/liO&61 Foruiafiis "Preliimnry tlef t nn Trojan EOC-2 Fuel Examination "
spt documents renills oP rntl-n* Cycle S (EQC-S) Fuel insp
ROEHL.D J Portland Osneral Cloctrtc Co 90V07/07 7pp.
IE
No
730051B FOTujT-d
one om pi iant e nnied
F1EH3. J L Region 5, Ban Francisco. Reactor Operations Nuclenr
ipport Branch Bft/07/09 ?pn
— B007300323 IE Inap Rept SO-344/BQ-13 on G0061Q-11 No noncowp 1 iance
noted Major areas inspected special announced insp of
circumstances surrounding t, corrective action* taken re UERn
80-07 t, 79-1S
HOUHILLiP J Region Si San Francisco. Office of the Director
STEFINDERO. D M Region 3, Ban Francisco, Reactor Operation! Nuclear
Support Branch BO/O7/O7 4pp
B0072SO413 Responds to IE Bulletin 79-13 "Inap of Feeduater 8(J*
Piping " Eiam of Feedutater (. auilllarv Feedwuter piping
revealed no detrimental conditions Responses to remaining
action items in IE bulletin submitted on 770719
CHRIBTENSEN. B , LENTSCH, J W . DROEHL, D J Portland Qtnaral Electric
Co BO/O7/1O Ip
R Periodic operating reports fc related correspondence
00071-10313 Forwards monthly operating rept for June J9BO
VUNDT, C P Portland General Electric Co BO/07/01 Ip
— B007I40315 Monthly operating ropt for June 1900
DAJR.O D Portland Oaneral Electric Co BO/O7/01 3pp
000717O5A3 Foriuarrfa "Mount St Helens Biweekly Rept - 000602-19 "
LENTSCH, J N Portland General Electric Co BO/07/O1 Ip
— aO0717OShB "Mount St Helens Uiueeklu Kept - B0060H-13 " One oversize
drauang available in Central Files only
<t Foundation Sciences, Inc BO/07/01 24pp
B Rsportablo occurrences, LERs t, related correspondence
0007070070 PND-V-BO-032 on B00619, 196 drum* of low level raduait*
received Eiamination oF shipment determined that one drum
was l&abing No significant radioactive contamination Found
State of MA hurial permit cancelled
THOMAS, R D Region 5, San Francisco, Office of the Director
BO/06/19 Ip
0a070a04ie Forwards LEJ1 BO-010/03L-0
YUNDT.C P Portland General Electric Co
80/06/S7 Bpp
— B0070B0420 LEU BO-O10/03L-O on BOOSS9, fol lowing r«fu«l ino, RC8 baron
concentration dropped beloui Tech Spaei Caused by personnel
error In calculation resulting in insufficient baric acid
being added to RCS More boric acid added
F>ERf)V, J C Portland General Elactric CD BO/06/S7 Ip
BQ071903B1 Fnllouiup rept re residual chlorin* Ii pH reading out of tp*c
for appro" 11 mi nit to 5 Highest value of residual chlorine
measured uiaa 4 ppmi lowest pH measurement uas 4 3 Caused by
operator error
VUNDT, C P Portland General Elocti-it Co HO/07/09 Ip
8007150B20 Forwards LER BO-01 1/03L-Q
YUHDT.C P Portland General EltctrU Co
00/07/09 Spp,
— BOO-71HOa36 LER BO-01 1 /03L-0 gn BOO61 1, during scheduUtf rnnlnt. Ooth
trains of emrrgEincy generators biere nut of svc at lame time
Caused by personnel error E<|uaHilng charge terminated b
Oiattory returnerf to svc
PEHRY. J C Ptirtland General Elnctric Co BO/07/09 Ip
8007230303 PNa-V-HO-OSA on £?0070B. off luent mater u/high chlorin* t, lou
nil outEide Tech Spec limits uaa released to Columbia River
Caused by operational error in addition of chlorine to svc
Ma tor
FISH.R Region 5. San Francisco, Office of the Director BO/07/09
2pp
00073(30618 RD on 000709. i-BBidi'al chlorine (. pH rc-adinga inere out of
spue for apprnt 11 minutes Highest residual chlorine
moastireinant uas 4ppm Lou?st pH mea-surement u*a 4 5 Caused by
operator- error
VUNOT.C 1> Portland Oenornl Electric Co HO/07/0-J Ip
BO07tS(KM7 Nutifias that D00417 immediate action items m LER 79-13
Nave boon cninpletod Requosts clearance to resume pouier
operation 9
BROEH1..D J Portland Beneral Electric Co 00/07/12 Ip
8007200543 Forwards LER BO-O12/03L-0
VUNDT,C 1- Portland QoneraJ Electric Co
80/07/16 2pp
— 0007830393 UER BO-012/O-3L-0 on BO0701. dur ing engineering walk down of
piping, three seismic restraints were found missing from
• taan drain line on steam turb inn-dri vtn auxiliary
feeduater pump Caused by oversight during const
PERRY, J C Portland Oeneral El at trie Co 30/07/16 Ip
BOQ72fl0943 Forwards HO re plant svc water effluent ph exceeding ETS
Halts on 00Q70B
YUNDT.C P Portland General Electric CD 80/07/16 Ip
— BQQ72B0973 RO on 800703. during chlorination of svc water sy«.i more
chlorine added than required* resulting in e»ce»dinfl of pti Ic
chlorine limit* of ETS Caused bg personnel error
Chlorination stopped tt dilution f 1 oui increased
» Portland Oeneral Electric Co BO/07/16 Ip
B0073 10433 Advises that all mods to masonry walls required prior to
pouer operation resumption completed on BOO71S NRC 800417
Itr approving licensee action end power operation resumed
BO0720
JOHNSDNjR H Portland General Electric Co 30/07/51 Ip
— BOO7310437 Advises that licensee action to assure acceptable structural
propertios of tnaionrg ualls has iati»Fied terms of NRC
BOO417 immediate action Itr Certificate of Svc and
ENOELKEN.R H Region 3, Ban Francisco, Office of the Director
BQ/O7/12 3pp
8007270354 Advises that all actions committed to in utll HOOABB Itr re
resumption of pouinr operations noui completed Summary of
results for uall mods re hiavguetght doubleiiiBf gh t uythvi
ltd weight double uythe & single uythe ualls end
BRDEHL.D 0 Portland Oeneral Electric Co SO/O7/25 2pp
DOCKET 90-346 DAVIB-BE8SE NUCLEAR POWER STATION, UNIT 1
F Security* medical, emergency t, fire protection plans
SQ-07J40S36 Forwards Director tit Nuclear Roactor Regulation order
further modi Fy ing B00513 order lu/respe-tt to licens.es A
permits Far facilities
SALTZMAN.J Utility Finance CrancJi BO/Ofi/ H Ip
— BO0714OS&5 Order granting extension until BOO709i for Cleveland Electrii
Illuminating Co to file amend tn tariff iu/FERC as reijulrfld
by BO0313 order
DENTON^H R Office of Nuclear Reactor Regulation, Director
BQ/Qfi/ll app
80G7140B73 Conditional request for hearing re Commission 900913 orb or
re mad of transmission tariff Urges mod of order to bring
consistency ui/FERC tariffs In Opinion 34 or Institution of
hearing Util protest before FERC & Certificate of Svc encl
GOLDBERG. R , WftQHEn. T E Cleveland, DM GOLDBERG' R Goldberg,
Field jnan t, HjelmFelt 90/07/0? 14pp
BOD739O&33 Response in opposition to City of Cleveland, OH 600609
request for hearing re Director of Nuclear Reactor
Regulation 8D0313 order Fi 1 1 ng, reijues ting tariff u/FERC,
fcrinfli controvBrsy to and uj/o litigoiiB coursp
REYNOLDS, W B , ZAHLER, fi E Cleveland Electric Illuminating Co
F!EYNDLD5,W 0 Shaw, Pittman, Putts t, Troiubriils B BO/07/23 Vpp
P Operating license fllsge documents, d c orl-e spondooce
BOO734O30B Fur Ward BliU 11cenG«esJ responsBS to 7f09O7 request far
review of schedule far Installing safety-grade anticipatory
reactor trip Por loss of feeduater & turOine trifl Review
should be completed bu V?]US
CrtPHA.R A TM1-2 Hullatins I, Orders 79/10/24 Ip
B007B30099 fleqiiests submlttal of proposed Tech Spec chang-es providing
For redundancy in decay Jieat removal capability in all modes
of operatiOTi Model Tech Specs uhich uould provide acceptable
resolution end for guidance
EISENHUT, D 0 Division of LicwnBing 30/06/11 62pp
BOO70V0334 Foruar<ds info re fir* protection sys mods scheduled For
completion prior to entering Mode 4 after current outage, to
aid In evaluation of request for revision to License
Condition HtOJh Lilts commitment! for interim surveillance
CHOUSE, R P Tolfcdo Edison Co BO/07/01 9p p
SO07230083 Requests participation In itudu at p eop Ie-r*lateil problems
in nuclear safeguards Study involves collection oF data on
licensee security forces b prat tints, NRC ulihes to intervleu
security ngt personnel At Facility
EISENHUT>D & Division of licensing SO/O7/U 2pp
3007580109 Ack receipt of GOOS1S Itr submitting revision to fire
hazards analgsic rept Propoted alternative to install
overhead sprinkler sys IB acceptable;
REID, R M Operating Heactors Branch 1 BO/07/17 2pp,
B007i00006 Denies 7903B3 Propoa«d Change 3 to Tech Specs tn alter
safety features actuation &ys containment radiation
instrumentation requirement Forwards requests for addl Info
re bypass capabilities of engineered safety features
MOVMi T tt Assistant Director for Operating Reactors aa/Oo/24
Spo
B00701O4A1 Forwards addl Info re atii Ft manning, lieensingj testlny of
pouier operated relief valve isolation SIJE, au tomnti c trip of
reactor coolant pumps b small trtrafc LOCA methodB> in response
to NRC 800307 Itr
CHOUSE, R P Toledo Edison Co HQ/O&/H6 4pp
B00718D227 Gummary of BOOalO meetinQ u/util t- D&U in Beth BEda, MD rv
fuel assembly holddoiun spring failures VI tugr-aptis encl
OARNER.D Operating Reactors Branch 4 eO/Oi/30 33pp
0 Adjudtcatory correspond t-nce
0007020310 Discusses 000339 Itr proposal for (netting requirements of
KIC BQO30H order to modify license. Section VII 2. Commitments
referenced in 77J2O6 draft ANS 3 1 are accpptablei u/
ejtceptlon of Section S S 1 &
KEPPLER.J 0 Rag ion 3, Chicago, Office of the Director SO/Oi/Jl
S007310243 Foruard* Commission BOO 527 memorandum b order containing
decisions on UCB 7B0302 petition for reconsideration of
7B0413 memorandum & order UCS 771104 petition (ought action
re fire protection for electrical cablna
EIBENHUT, D 0 Division of Licencing BO/06/H5 B9pp
H General correspondence
BOO7290048 Respondo to inquiry re Plootfing of site, Natural phenomena
conHidered tn plant design It canst Access to & from plant
during flood conEidorod in emergency plan In flood Emergency
rail, boat or DKH transportation lulll be utiliied
KEPPLER.J 0 Regions, Cfcicaoa, Office of thB Director BO/05/SS
M Antitrust correspondence
13007210-004 Forwards queetions re fuel assembly holiliJown spring insps t,
safety signii f l-canc B of opcrdtinj u/broken springs in core
Requests response within AC day«
NOVAK, T H Assistant Director for Operating neacturs 00/07/01
4pp
QO072I0033 Forwards request for adJl tnfo tor revieu of plant operation
in Cycle S Responses should tie received tnj E300715 to permit
completion of revieu b« projected startup date
NDVAH.T M Aesistaivt Director for Opsrutlng Reactors BO/07/01
9pp
S0072101I3 Requests reaponso to enc 1 quaations re f UK 1 assembly
holddDun spring failures, Initial holifiJouin spring failure uas
identified during uniteruater insps of fuel in re-actor vessel
during current refueling out-age
NOVAK. T M Assistant Director for Operating Reactors BO/07/01
3pp
B007170437 Forwards Anufntl
Si availability
REID. n U Operating Reactors DrnncM 4
to Licenao NPF-3, E1A d notice of isauanc*
BO/07/O2 5pp
— 80071704ol Amani) 36 to License- NPr-3, do let i ng Efltisfi&d App 0 ETS re
studies on Fish.fmh eggs t, larvae
M OpEToting Reactors Branch 4 30/07/02 ipp
SM7MOH31 Foruiardc Director o-f Nuclear Reactor Regulation order
further modifying 000313 order u/reapact to licenses &
permits far facilities
BALTZMAN.J Utility Finance frronch SO/0&/H Ip
-B007170467 EIA supporting AmpniT 2& to License NPT-3 State of OH 80061-6
Itr re mod of NPDEB Permit B311-«ftD enirl
n Operating Reactors Branch 1 60/07/05 3Bpp
-90O7I70477 Notice of issuance fc nvsi lali i 1 » ty of Amend 2 fa to License
NPF-3 t> negative declaration
HEID, R M Operating Reactors Drancfi 4 80/07/03 2pp
202
BCQ7210321? Partial ds Amend 25 to License f.PF-3, saf e t y evaluation !c
notice of issuance fc availability
KEID.R W Operating Reactors Branch 4 BO/O7/02 2pp
— BOQ7S1O333 Amend 25 to License NPF-3. nod i f y ing Tech Specs on
surveillance frequency for venting ECCS pump casings t
discharge piping high points Alto corrects typographical
error m Table 3 7-3
RE1D.R W Operating Reactors Dranch 4 BO/07/02 7pp
— S007210335 Safety evaluation supporting Anend 25 to License NPF-3
« Office of Nuclear Reactor Regulation, Director BO/O7/02 2pp
— 3007210340 Notice of issuance & availability Of Anend 25 to License
NPF-3
HEID.R H Operating Reactors Dranch 4 80/07/O2 2pp
8007250001 Requests submittal of application for amend to license
confuting of Tech Spec changes !, license conditions PWH
Model Tech Specs t Model license conditions for TMI-S
Lessons Learned Category A items end For guidance
E1SENHUT 0 0 Division of Licensing 60/07/02 69pp
600710,0125 Forwards Anend 27 to License fJPF-3, iflfstij evaluation t
notice of issuance & availability
REID. !I H Operating Reactors Branch 4 30/07/07 2pp
— (1007180133 Amend 27 to License NPF-3. modi Fymg Tech Specs to reflect
changes in lorporate structure of util
REID.H U Operating Reactors Branch 4 60/07/07 14pp
B0073103QO Forwards rcsponae to NHC 000624 i equo«t for addl Info r«
bypass d reset of anginoerDd aafuti| features Design goal at
safety Features actuation ays is to automatically prevent or
limit Fission product 1 energy mlease from care
CROUSE.R P Toledo Edison Co 80/07/33 Spp
B00731033O Forwards request for addl Info for review of 0OOH11
proponed Tech Spec ehanuo to supprirt oparfltion durlno Cycle
Z Requests response by BOQ729
NOVAK. T M Assistant Director for Opsratlng Reactor* 90/07/33
3pp
Q Inspection reports, IE Bulletin* B. correspondence
B00714O54B Forwards IE Insn Rept SO-346/flO-lQ nn H00413-17, 29-Q30I,
06-08 fi 12-13 No noncompliance noted
HEISHHAN.R F Region 3. Chicago, flonctor Operntlnni Nuclear Dupport
Branch BO/03/27 2pp
— -B00711055B IE Inap «opt SO-346/SO-10 on B0041S-17, 39, 30- 03O1, OA-Oll K IS
-13 No nan compliance noted Major are us Inspected preporntlqn
for refueling autagn, pre-Fuel handling activl t»«. Puol
handling activities & molnt during nfuulino outuoe
JACK I M, I N . SHANSON, E ft Ho 01 on 3. Chicago, OPfic« of tha
Dlroctor BO/OS/ 23 Spp
0007020036 Forwards IE Info Notice 00-22, "Brnnkduun*. In Contamination
Control Programs " No wrilten roipoTiso requlrud
KEPPLER.J Q Reuion 3, Chlcapo, Office of the IKi-tctor 00/OO/S8
IP
— 8007180)40 Safety evaluation supporting Aasna 27 to License NPF-3
» Operating Reactors Branch 4 00/07/07 2pp
—8007160149 Notice nf issuance I, availability of Amend 37 to LiCBns
WF-3
HEIO.R M ape~ating Reactors Dranth 4 SD'07/0/ 2pp
E0071S0670 Foruarfla suppl to OOD21I reload rept describing info
supporting repaira oiadg to failed springs in fuel
asseablies
CBOU5E.R P Toledo Edinon Co 8O/07/1O 4pp
SOO726O3b3 Advises of personnel change
of DFc OF Nuclear Reactor Regulation
NOVAH. T M Assistant Director for Licensing
ulting from reorgani (ation
BO/07/10 JJpp
8007310454 Respond, to 760120 request For overall asyrm*tr,c LOCA
load evaluation BAH-I621,re Phase II analysis of LOCA
loadinjj, provide* acceptable demonstration of facility
ability to maintain core coolability
CHQUSE.R P Toledo Edison Co BO/07/14 3pp
B0072305B1 Responds to NBL Q007O1 Itr requesting addl info re Cycle 2
including design, transient analysis & startup testing Prior
to fuel loarfino. insp is made to ensure assemblies are in
proper storage location in spent fuel pool
CHDUSE.R P Toledo Edison CO BO/07/16 4pp
8007250427 Besponfls to NRC B007O1 Itr re fuel assemMy holddoun spring
failure per B0071O meeting lu/N^c !« Bl,W re proposed repair
process Cycle 3 Reload Rept nuppl on 80O71O noted
replnceaent of broken springs Detailed respon*es encl
CRDUBE.H P Toledo Edison Co EO/07/1B 9pp
fi0072S03B2 Informs that ut, 1 modifytng current RCS flou, indication
scheme m manner s.mi lav to NRC acceptable method Effort
Kill tie completed prior to startup following currant
rtfuelinp outage
P Toledo Edison Co SO/07/31 IP
79030 Itr
CRWSE.R P
n
"mplet.no ,ufll i f .cati on
'" Attarhment 1 to HHC
Station.
Toledo Edison Co QO/07/22
t Toledo Edison Co BO/07/S2
IBpp
B0072804B9 Co^its t. suppl 7BO32O license a-nend request bg chanain
I ±'rab ^""V ?S8 "•'•P'-.-wr. protection For per od, "
CHOUSE R ? T^' 1* i""11"** "'"I1 ^Ive ,„ Modes 4 t, 5
CRQVSE.R p Toledo Ediaon Co BO/07/S2 S
BO/07/S2 Spp
B0072103i4 roruarda IE Circular B0~13< "(Irld Strap Damofli In
Hestlnghouse Fuel AssombliBB " NO urittan ra*pon*(i renuirao1.
HEPPLEfl.J 0 RBBion 3, Chicago, Dffito at thu Director BO/OB/2B
IP
B007010116 Forward: IE Info Notice 80-23, "Loiia of fluction to EH»m»n
FeeduatHr Pujapo " No written CBBponne roqtilrad
KEPPLEfl.JG ilegion 3, Chicago. HPfico op tlie Director BO/03/29
BOQ721Q333 Forwards IE Insp Rc-pt SO-346/BO-14 on BO040fl-l 1, 13-35, 39-30i
0301,02 t, OH-09 t, notices of violation
HEISHilAM.R F Region 3, Chlcajjo. Reactor Construe tlon & Engineering
Support Branch 80/06/03 2pp
--800731032S Notice of violotiotl from insp on EJQOflOB-1 1, 13-23, S9 -30,0 SOI,
03 tc 03-09
« Rtgion 3, Chicago, Office of the Director, 80/06/03 lp
--8007210327 IE Insp Hopl 90-34C./BO-14 on H0040H-1 1 , lf)-B3, 39-30, OSQt, 03
t 09-09 Honcomplianco noted' failure to oetoblish Plr* watch
patrol
REVES, L A , 11COREOOR,L 0 . TAI1BLINO. T N
of the Director HO/06/03 Bpp
Region 3, Chicago, Office
B007010234 Nptifies thnt info i-oquoeted bo IE Btlll«tin BO-09. "Vocuu*
Condition Reaultinn In Damage to Chemical Vol Control 3ga
(CUCB) Holrtup Tanlia,1* is botng compiled & itvaluatoi) Rn.nonia
will be available on B00637
CRQUSE,R P Toledo Edison Co B0/0f,/0o lp
B007S3021B Forwards IB Info Notice BO-3A, "Ev«lUfltion at Cnntr.ctor
ufl Programs No written response roqulred
KEPPLEB.J 0 Region 3, Chicago, Office of the Director BO/OA/10
B007160191 Foru;ardE IE Info Notice SO-S7, "Deoradotion of n««ctov
Coolant Pumps Btuda " No specific action or retpons«
required
KEPPLER.J O Region 3, Chicago, Office of the Director 8O/OA/11.
-,™?"^" r"pon»H tD IE Bflletin BO-06, "Enolneered
Feature CEBF) Resat Controls " fie-revimu of all snfetu-
related components affocted by safety f«atur» actuation *uo
rnnuRF Sa» ""'I"? ^l"11 "Dt; romDVE tomP0"«n* ^om Baf. mon..
CflDUBE.R P Toledo Edison Co BO/O6/13 3pp
B007130B24 Forwards results of follow-on analysis of Identified
discrepancies for normalli, accessible saf ety-relntod piping
in response to Item 4Q at IE Dulletin 79-14, "Seismic
™,,"sis 'Dr A=-n"ilt SBFefcy-RHlat*(l Piping Sua «
CROUSE.R P Toledo Edison Co aO/06/J£. %„
DOCKETED ITEMS
— BOO7HQ471 IE Imp Bept 3O-346/79-34 on 79-121B-11? No noncompl innce
noted M*jor arias inspucted actions taken In response to IE
Bulletin 79- 11? re loin level raduiaste packaging For transport
* burial
OREOER.L R Region 3. Chicago, Office of the Director
FISHER, M L Region 3, Chicago, Fuel Facllitg & Materials Safety
Branch SO/01,/13 ipp
8007O3OO4& Forward* IE Bulletin 80-19. "Possible Lose of Emergency
Notification By a (ENS) W/Loss of Offslta Power " Written
rat panne required
KEPPLEF, J 0 Region 3, Chicago, Office of the Director SO/Oi/lQ
B00717OO64 Forwards description of result* of follouon analytical work
to IE Bulletin 79-14 Effect of 41 sci-epanci es discovered In
IE Bulletin 77-14 insp evaluated Conclusions In 791O19 Hr
still valid
CRDUSEi R P Toledo Ed i ton Co SO/O6/1S 4pp
BO0718031O Rxpondt to Items 1,2 b 3 in IE Bulletin 79-03, Revision A No
applicable piping components u/design prosoure stresses
greater than B3X of allowable code values Identified
CHOUSE, fl P Toledo Ed I ion Co 00/O6/1B, Bpp
900714O237 Forward i response to IE Bulletin 60-10, "Cunt ami nation of
Nonradioactlve Su.s h Resulting Potential for Unmnni tared,
Uncontrolled Release of Radioae tivi tg to Environ "
Unprotected sys are regularly sampled tt tested far tritium
CRDUSE.R P Toledo Edison Co 80/06/19 2pp
8007230327 Forwards IE Imp R*pt 30-346/80-11 on B00410-1 1,31-22,
05Q6-07 k 0604 No nancompl iance noted
FIORELLIiO Region 3. Chicago. Reactor Construction b Engineering
Support Branch BO/ 06/19 Bpp,
—8007230333 IE Insp Rept 50-346/00-11 on BOO410-1 1 1 31-22, 0506-07 b Q604
No ntmcoiHpliance noted Major areas Inspected GA/Q.C program,
nondei tructiv* eiaminatlon evaluation! h work Activities
MAAD.K D Region 3, Chicago, Office of the Dime tor
D AN I EL SON, D H- Region 3, Chicago, Reactor Construction Si
Engineering Support Branch BO/Oi/lB 7pp
BQO7O2Q371 Forwards IE Circular 60-13, "Lots of Rnactor Coolant Pump
Cooling & Natural Circulation Cooldoun " No written response
requirntl
KEPPLER, J Q. Region 3, Chicago, Office of the Dime tor 80/06/20
8007090013 Forward* notice op violation & notice of proposed imposition
of civil penalties re B0043O radiation overeiposure
HTELUOi-V Office of Inspection & Enforcement, Office of thi
Director BO/ 06/20 3pp
— BOO7OVOOM Notice of violation re radiation overt jpoaure on BOO130
Noncoaip llance noted, tuo persons received dote greater than 3
r««s in nuartsr It eiposura rate evaluations were not
ad* quote to ensure do«e limit* would not be exceeded
Office of Inspection li Enforcement, Office of the Director
B00730O&0') Notice of violation from map on 000313-16.. 19-23, 38^
Oh t 09-10
• Region 3, Chicago. Office of the Direttor 80/04/34 Ip
HOO730O606 1C !nsp Flt>p t 50-:M6/BQ-l 5 or> BOOS 1.2-li, 19-23, HB-3ff. 06
09-10 NoncompliancB noted Failure to nntify NRC op era t i on s
ctr uithin 1 -h of occidental radioactive rcloasD- or ovont
requiring initiation of emergency plan
TAMQLINO, T H , HEYCB. L f> rScginn :), Chicago, OPrtcB of th»
Director BO/OA/24 flpp
B00723QO76 Responds to IE Bulletin 79-17. Revi 6 ion 1. "Pipe
Stagnant Dor a bod Water Bus at PUR PI ant a " All uelds
aiamined tt found to- be cleitr of rucordiitle indications
P Toledo Edison Co BO/O6/37 Ip
B007S3O141 Foruardt response to IE Bulletin BO-O5, "Vacuum Condi ti
fiBsuItinu in Damage to Chemical Vol Control Sijs (CVC9J
Holdup Tanka " RcviBui shams carrot tive actions not required
GROUSE, I? P Toledo Edison Co BO/06/ST ipp
8007H30340 Foruaros IE Dulletln BO-li.. "Potential Misapplication o
Rpfiemaunt tnc Mndifls 1151 & 1152 Prosuure Trarmmi tters
W/Either A or D Output Codes " Written response required
IE Circular 80-16 aloe uncl No lurittan rosponse required,
KEPPLER, J Q Region 3, Chicago, Office af the Director QO/06/
B007170332 Respond* to IE nullutln 79-11. "Seismic Analysis for A>
Built Safetij-Ri!-lat0d Piping Bija " Insp ap normallij
inaccoBiible piping cnmploteiJ 800532 Two iloviatlons
affecting ags op er.i b i 1 i tij will be corrected befnvB startup
CnaU3E,ft P Toledo Edison Co 00/O6/30 3pp
B007 100371 Advises that ronpor.B to Items 1 , 3a fc "3 of IE Dultetln
80-11, "Masonry Wall Doslan." iulll be delayed I a* beijond
datu specified in bullotin
CROUBE. R P Toledo Edison Co 90/O6/30 If
B0073103IU Jloaponds to IE Bull ot in 79-02. "Pipe Support Oaim Plata
DBslgnn Using Concreto Eiponslon /irtchor Dolts " Outstanding
items have been comp Ic-tnii! oicept base plate ac cessi b t ] ity
which utlll bo tampletud by B011O1
CRDUSE, n P Toledo Edison Co BO/07/01 Spp
8007210034 At I receipt of 800AI 1 1 tr informing NRC of step* tnlon
correct violation noted in 1C Insp Ropt 90-346/00- hi Details
withh&id <i-«r iocma 790)
HIND,!* A Rofjion a, Chicasu. HaPoa uard B Branch BO/07/03 Zpp,
— 8007540030 Responds to NRC EJD0931 1 fcr re violation noted In IE I
Rept 30-346/BO-13 CorrectlVB actions ulthheld
Craf 10CFRH 770)
CROUSE.R P Toledo Edison Co BO/06/11 Ip
B0073302QO Toruardi reply to IE Dullnbln BO-OQ re containment lir*»
pen»trallan ueldi Repfco r-eoulto. nf const nondestructive
•lamination of penetration welds
CROU8E, R H Toledo Edison Co 00/O7/JO &pp
-BOO7O9OO16 Notice of proposed imposition of civil penalties bavsd on
it two of nonconplianc« re B00430 radiation ovoreiposure
» Office of Inspection fc Enforcement, Office of the Director
BO/O6/20 Ip.
B007SaOaOO Foruords rop.ly to IE flullHtin BO-OD TP containment llnj
penetration uclda n*pto results nf const nonde atruc t I vo
examination of pone trntion uieldii
CRDUEC-H P Toledo Ed icon Co BO/07/1O 6pp
B00711O214 Forniards notict of violatinn fc notice of proposed impoaltion
of civil penalities arrislng from IE 800430 insp
STELLO, V Office of Inspection l> Enforcement, Office ot the
Director BO/06/20 3pp
— BOO711O220 Notice of violation from insp on 800421-34i OSOH b Otj-OB
NOTICDBP lianc* noted chim fc rad tester reciiivBd doses
• iceading 3 rems b exposure rats evaluatians tnB.de during
cunp tunnel entry were inadequate
* Office of Inspection & finfortemnntj Off is* of tfie Director
8Q/Q&/SQ Spp
9007170313 Forwards IE Circular 8O-14. "Radioactive Contamination of
Plant DpnUneraliied Motor Sgt tc Resultant Internal
Contamination of Personnel " No uritten responie required
KEPPLER. J Q Region 3, Chicago, Office of the Dimeter 80/06/34
IP-
S0073OO6O1 Forwards IE In«p Rept SO-346/00-1B on Q0031K-1A, 19-S3. SB-30,
06QS-06 «r 09-10 t> notice of violation,
HEISHMAN.R F Regto-n 3t Chicago. Reactor Qperatlont NueUar Support
Branch HO/Oi/BS 2pp.
8007H403107 Foriuards corretteJ copu of notice of violation Prom ins
000312-16, 19-P3,2U-3!>. OAO-^-Oft It 09-10 uh i c h ua s. trausmlltei)
bu nnc aoo^as itr
HEISHMAN, n r Ran. inn 3. Chicago. Reactor OpDi otion> Mutloar Cujl
Branth 00/07/10 Ip
— fl007E40313 Corretted notice of vlulnllon from ireap on B003JH-1A,
Sfl-30, Oft02-OA t. 0°-10
* flpgion 3, Chlragoi OfPicc of the Dlvpctur BO/07/1O Ip |
B007HSOS72 roriunrdB roaponno lo JIE Bulletim GO-09, "ITiaM of Cpnta|i
Liner Penetration Welda " List of all peTvetroHonB iaf \
containment boundary liutt we Id a hntuneji p&nelraiion ilcnve & [
proc*s» piping an lllnslrftted in AS!MG toile end ,
CROUBE. R P Tolacto EdlGan Co BOy 07/10 6pp
B007ai!OBOO Foruioi ds nmuamij wsl 1 ilosign evdlustion in response to-1
l,2a J. 3 of IE Dukletin BO-11 Rafe ty-rslated (- nopieaf-Btij- [
related com pun en La idpntifiei on Faces of walls Partial ,
map on BO to It emu Sb t, 3 mill be filed bij 001101 '
CROUBE. R P Toledo EiHspn CP QO/O7/14 9pp I
204
BO073103ia Forwards response to NRG 800630 Itr re 800430 personnel
overop QGiire Corrective actions procedure now requires insp
oF cavity area surround ing reactor vessel to identify water
leakage Parent of civil penalty end
CROUSE, H P Toledo Edison Co 30/07/15 5pp
flO072a0429 Forwards IE Investigation Rept 50-346/80-14 on B00603-06 fc
notice of violation Notice of violation withheld <ref
10CFR2 79O1
KEPPLEH.JG Region 3j Chicago, Office of the Director BO/O7/17
2pn
— BO O7 3 BO 4. 3 5 IE Investigation Rept 50-346/BO-18 on B006Q5-06
Nontomplicince noted failure to assess adequacy of access
control 5. to meet security plan commitment App D rept
details withheld (ref IOCFR3 790)
WEIL.C H , MADEDA.T J . HORELIUS.C E Region 3, Chicago, Office of
the Director BO/O7/11 npp
Q007110407 Forwards LEn BC— O45/03L-O
MURHAV.T D Toledo Edison Co BO/O7/O3 lp
— B00711041A LER BO-O45/O3L-0 on BOO609, iiih 1 1 e preparing to porforia BT
5091 OliNI-2 found partially d i sconnected Pron equipment in
control room Apparently caused by personnel error Info tngi
hung nn coal cables to insure proper connection
WERNER. J Toledo Edison Co 00/07/O3 Spp
BOO711041B Forwards LER BO-046/03U-0
MURRAY. T D Toledo Edison Co BO/07/03 lp
— B007110423 LER BO-046/03L-0 on BOQiO6. during performance of ST OO93 01.
spent fuel pool level fell below Tech Spec requirement
Caused by improper alarm setpoint Alarm setpoint adjustad to
prevent recurrence
CECH.L M Toledo Edison CD BO/07/03 3pp
B007310534 Ac k rereipt of 300i27 1 tr informing NHC of steps taken to
correct violation noted in IE Inap Fiept SO-346/BQ-14
HEISHMAN, n F Region 3, Chicago. Reactor Operations Nuclear Support
Branch GQ/O7/22 lp
— a00731O536 Responds to NFIC BO0605 Itr re violation noted In IE Insp
Rept 5O-346/BO-14 Corrective actions appropriate personnel
uiill ensure that fire ujfltch is established as required by
Tech Specs
GROUSE, R P Toledo Edison Co 90/O7/OB 2pp
R Periodic operating rfporto & related correspondence
BOO714O318 Foruards monthly operating rept for June \1BO
HURRAY. T D Toledo Edison CD QO/07/OB lp
— HOO7140332 Monthly operating rept for June 19BO
SARSQUH.D Toledo Edison Cn BO/ 07 /OS 3pp
B Reportable -oc currenceE. LGRs (. related corresponflencB
BOO7O10434 Forwards LER BO-043/03L-0
MURRAV.T D Toledo Edison Co 80/06/26 lp
6007010439 L-tR BD-043/O3L-0 en B0032B.uhile testing safety features
actuation sys.vnlve DH-11 tloscd $< DM pump 1-1 uas stopped
Caused Ijy procedural inadequacy Responsible personnel uiere
made aware of problem
:SLE¥.T Toledo Edison Co 60/06/26 3pp
uarita LER BO~Oi54/O3L-0
Toledo Edison Co BO/06/S7
— B007030Hi4 LEii BD-041/O3L-0- on BOOD31 . decay heat Plou indication
FI-DH2Q dropped loui off ecale Caused by technician
performing surveillance test on itiservlcH flow transmitter
string w/o shift eupsrvlsor knnmledge
MAKATURA.L Toledo Edison Co 30/06/27 2pp
B007150&09 HO on, OOO627, pipe support HCB-40-41 on component cooling
uater supply to control rod drive mechanism Pound not
installed] Al 50. la leral restraint CCA-B-H15 nn pressuriier
r&licf inlet located 9 inches from analyzed location
MURRAV.T D Toledo Edisnn Co 80/06/27 lp
80072 1Q37 3 pDruarils questions re failure of holddoun spring on fuel
assembly Response should be submitted in time tor NRC to
include dlscus-biun in safety evaluation for reload
NOUftK.T M Assistant Director for Operating Reactors 80/07/01
B007110440 Formal ds UER BO-047/O3L-0
MURRAY, T D Toledo Edison Co BO/07/O3
~-e007I1044B LER BO-Ofl7/O3L-0 on BOOAOB, shift supervisors dlseo
doors 3O6 & 401a bloclnd open Apparently caused by lath of
administrative controls when ^emporary *ign» on doors u*ra
prematurely removed before all permanent signs installed
CECH.L Toledo Edison Co BO/O7/03 2pp
B007150560 Foruiards LER BO-04B/O1T-0
MURRAV.T n Toledo Edison Co BO/O7/1O lp
—0007110546 LER 80-04fl/OlT-0 nn B00627, during IE Bullatin 79-14 imp
pipe support HCD-40-B1 Pound not installed & CCA-D-H13 found
mislocated Caused by initial const/instat lation error
Supports mill be installed in proper location*,
HGKBEL.C Toledo Edison Co 80/07/1O 2pp
B00734013i Replacement trflnsmittal Itr for LEW DO-04H/01T-0
MURRAV.T D Toledo Edison Co 00/07/10 lp
0007170441 Forwards LER BO-049/03L-0
MURRAY.T D Tulodn Edison Co BO/07/11 lp
— B007170450 LER BO-O49/03L-0 on B00614, during restoration of containment
pressure inputs to safety features actuation sys cabinatli
actuation occurred1 Caused by deficient procedure ST 3061,01
App F not requiring trip bypass test
igLEV.T Toledo Cdison Co BO/07/11 3pp
BOO722O375 Foruflrds LEH SO-OSD/OJL-O
MURRAV.T D Toledo Edison Cn BO/O7/17 lp
— B007230378 LEH BO-050/Q3L-0 on B00623, uhlle preparing to run BT
5091 Oli inboiird & outboard bearing thermocouple mills found
broken on HP I pump 1-1. rendering motor inoperable Prabablu
caused by personnel stepping on line Hells replaced
HARTIOAN. J P Toledo Edison Co SO/07/17 2pp
B00722045B Forwards LCR HO-Q31/03L-0
MURRAY, T D Toledo Edison Co BO/O7/17 lp
— 8007220465 LER BO-051/03L-0 on 800619, uhi 1 e porf orminfl ST S031 07
Phase It, sequencer logic channels 2 d 4 did not operate ••
designed Caused by component failure of i clay BEQX t, CR-3X
in C361B Relay EEOX was replaced CR-3X uiaa cleanad
1SLEY.T Toledo Edison Co BO/07/17 Hop
B007Sa0396 Forwards updated LER 80-OSO/03L-1
MURRAV.T D Toledo Edison Co BO/07/21 lp
9007110427 Forwards revised LER 77-Z/Z/01T-3
HUHRrtY. T D Toledo Edison Co BO/07/02 lp
— at>07110134 Revi-sctf LER 77-ZZ2/01T-S nn 770B05, during hot functional
tcsti ng, pros^ur] ler pouer operated relief valve uas opened tt
saver? movement nf dtscharge piping was observed Caused bi/
loop 5-oals allowing ueter slug tb cause pipe movement
QUENNQZ.S M 7nle<li) Edison Co 77/OB/19 4pp
--B00/2a0602 Updated LER BO-030/O3L-1 on 800iH3, inboard (. outboard
bearing thermocouple wells found broken on high pressure
injection pump 1-1 Probably caused by someone accidentally
stepping on line Wells replaced (< oil r»**rvoir* refilled
HARTIGAN.J P Toledo Edison Co BO/07/17 lp.
B0073B0571 Forwardu LER BO-053/01T-0
MURRAY.T I) Toledo Edison Co BO/07/23 lp
0007110391 Forwards revised LEH 79-126/03L-1
MURRAV.T D Toledo Edison Co BO/07/03 lp
— BO-O7110397 Revised LER 79-126/03L-1 on 791 S09, during diesel generator
test, generator J-l eiperienced load swings as load ulas
increased Mo ipuiiFic cause determined Oain !i stability on
e>lectT-ic governor needed slight adjustmpnts
HART I CAN, J P Toledo EiJison Co BO/01/05 2pp
--B0072B057B LCR 80-0&3/01T-0 on 800709, meeting held to discuss results
of integrated safety features actuation sys test Borne of
logic modules on sequencer steps 2,3.4 !< 3 tripped before
being blocked Caused by design deficiency
ISLEY.T Toledo Edison Co 80/07/32 3pp
8007230630 Forwards LER BO-O52/D1T-Q
MURRAV.T D Toledo Edison Co 60/07/32 lp
DOCKETED ITEMS
205
— BO072HO&43 LER BO-O92/O1T-0 on 800709, d urina review oF seismic
cul culationsi o i haust ductwork of "emergency diesel jenerators.
treated over-stressed condition.* at eihaust nonles Caused by
deiign deficiency Supports lui 1 1 bo adtfifd
HAHTIOAN, J P Toledo Edison Co 90/07/23 3pp
B0072B03B3 Forwards LEfl BO-QSfl/QSL-O
MURRAY, T D Toledo eiHon Co 30/07/33 Ip
— B007SaOSB9 LED BO-054/Q3L-O an eOQ627,NI-l output failed to lero during
fuel assembly movement Assembly, removo* & put in support
rack Cause unknown but may be intermittent grounding problem
DIP component failure Ground problems under investigation
WERNER, B J Toledo Edison Co 80/07/23 app
BOO/200609 Forwards revised LER 77-084/OST-l
HURRAY, T, D Toledo Edison Co 80/07/33 Ip
— 0007280622 Revised LER 77-D84/O1T-1 on 79O3Ob> tontainment air coolers
•vc mater outlet valves failed to meet response tijiiB Caused
bg undersiied air opening on pneumatic actuators Valves
For cod Full Of en Actuating mechanisms redesigned
RUDOLPH, J P Toledo Edison Co 79/OB/17 Sp p
--00073^0515 Rddiatinii Control '< F'TDtcction Pror
fiavininn 1 J'l1urjile 5-ti 1 i di f 1 1 a t \ on Unit Oper
MCCP.ACKEN, K W .MaUdma Puupr CD E)0/Ol/lf>
rNP-n-nCP-17->,
BOO732055B Foru'ards Revision 1 LHanije prides to plant oFfsitc
callbr rriariu.il 1 nc or p ora tut ladi.itioi, mcnitnr Eetpnint
calculation methndo 1 ogy d i scuh&ed during BOO/0? netting
CLftYlON.F- L Alab
6pp
8007320554 Fo
requested i
•CLAY1CIN.F L
iiaT il 5 ,iu c 1 1 i di g f E
NFiC BOQ40B Itr
Alabama Pnuer Cr
tes.t ttota A test i n Fa
8O07,'3O40:i rnrnurds add) iiiFt. r i> dL-(jr.n1ed olsctritsl pnuer grill
cond ] lions, in ri-spunsp to HOC&Jt telcon Indudei aupp 1
to util 7'9i)115 Itr re s^ spastnu lit »e Hftf fo^itipns 1,3 A 3
CLAVTON.T L rtlaburta Pnuer Co EMVO?/!? 13pp
HOO7J30533 Foruiaids rail t D I 09 it J 1 T«th &p*
instTumeint.it ion lalibr H/n ore]
CLftVTON, F I Alnbama Pou-ur Co
DOCKET 30-348 JOSEPH H PARLEY NUCLEAR PLANT. UNIT 1
F Security, medical, s mergence (• Fire protection plans
B&07SBO(b41 Responds la NHC BO0703 Itr i-Bque»ting Info re evacuation
tliDB* Util BO0204 ItT- w/State of AL & OA officials cifinBieiits
tncl.
CLAVTONfF L Alabama Pnuier Co BO/ 07/21 [p
0 Adjudicator*] cor re» pond once
BDQ71QOO21? Forwanlft ri>viB«d f'nyei 1 *. J to IJRC £300^30 evaluation
util re6pflnE.fi to TM1 LeasanE Lenrned Cfltcgori} A items
V A FIG/1: a r\ Oporsti-ng n*(ittt>T5 Dr.inch 1 6Q/0;/B3 -Ipp
D InEpettion r€|jcirt«
BOO72401O9
No response required
O'REILLY, ~J P Bo in on
NntiLe BO-^0, "Ltjis of Decag Hoa t Removal
Unit- ] Uhi]e tti ReFuelinj Modl» "
f tlie Oiructor
BO07310243 Forwards ComreiiBBlDn BOO537 meraoranrium *t order containing
dvclvlon-s on UCS 700302 petition for reconsideration of
7OO413 mnmorandum & order UCS 771104 petition sought action
r* fira protuction for electrical cables
•EtSEWUT.Q 0 Division of Licencing BO/Ofi/aS B-Jpp
K Utility
Eafetg AnalysiE Report (FBAR) & amends
ao&71002fal Forwards Amend 73 to FEAR for I/nit 1
Unit 2
CLAYTDN^F L Alabama Power Co BO/07/OB Ip
QL application for
~B0074002i7 Application for Amend 73 to FBAF1 for Unit 1 *- OL applitatiori
For Unit 3 Certificate of Bvc entl
» Alabama POM or Co BO/O7/OB Ipp
— 60O7100276 Amend 73 to FSAR for Unit 1 & DL application for Unit S
R»vi»B5 Unit S cpmpletion of const & commercial operating
<tat»Sr up dat Ing section re amergencij lighting -sys & info
pertaining to 0-ft program
• Alabama Pouor Co 90/07/OB 400pp
P OpDratlng license itaQe documents d correGpondence
BOD70201SO Portends IF InFo- No 1 1 te BQ-2S, "BreakdouTis In Contain: not 1 ori
Control Progi anii " Mo uiitli'ii re'.pnntt requiru'o1
O'REKLV-JP Rerjiun2, rttlnnt.i, DFfito vf the Director 60/05/28
If
B0l>7310'119 Foruiairfs IE Circular OD-1J, "«i I il Strap Damase In
Uestinghouso Fuel «\s =c™b 1 [ t'li " Nn unttun i espouse reijliircO
O'REILLY. J P KoQinn 2. Atlnntii, IJffitt' lit the Dl rue tor 00/03/2Q
B007Oloaon Foruiai ds 1C Infu Notice U0-t'.3i "Loai of Suttlon to Fmorgency
Feediuater Pump 5 " Ho written rosyansr rEquiroil
O'HEILLV. JP Ftegiori 2, /Ulnnta, Office n F the Director CQ/05/27
IP
Fcrumrds IE Info Null ID 00-26, "[^valuation of Contractor
art Prngrami " Nn uintterk rnt,pun«e required
O'REILLV,,) P lieaian 2, rtlluiitd, Offitc of bhe Dirottor 00/Oft/JO
B00^2-103ii9 FiiruardE IE Insp Rept LO-.lin/llO-l 1 ur> flOOb37 No
noncomp liancc nntcd
QTOHH.J P Fleginn «', Atliintr.i, hurl I.irilltij !, Haleri.ils Safety
Branch UCVO(b/lO 3pp
8007230099 Bequest t submit tal of propoiad Tecli Spec changes providing
for redundancy in- decay heat removal capability in all modes
of operation Model Tech Specs uihich uoulri provide acceptable
r««olution tncl far g-uidanca
EISEMHUT.DO Bivlsioit of Licensing BO/O6/U t>3pp
— B00721037i IE Insp Rept Itl-JIfJ/fifi 11 or. UC0527 No naiiL ampliance noted
Major arens i utfiec tea majoi t aA i at i on emcrgcnc u eitrciar
TBflJANOlJ5«I.R El- DHrtDFOF,!!, H H He>-)iori P, Atlanta. DfPice of tins
DJrettor JETNKIH'3. (i It Region >', AtldHtfl, Fuel rscilitij t<
MaturiaU Snft-ty Or.inch tlO/O^/O-V 'Jpp
BO&7t9O714 Reaponds lo HRC S00507 Itr re arfdl TMI-2 related
rsquirnmentB b Bubnitn response far Unit 1 Shift manning'
rrvlsed scope ti criteria far licensing BISI-BS & (jrocBiures
for feedback of operating eiperience to plant staff encl
CLAYTONiF L Alabama Power Co BO/Ob/Sb 29)>J>
ao071AOi!lB Foruar-ds IE Info Notice OU-^?, "nejradiitl tin nf R
Coolant Pumn Stud-. " fJ-n SDeiifi-c iiclion or rc'ppnnEt1
requli-od
Q'RFILLY.J P Rpgion 2. Alldiita, UffiLP <JP the Dnecti>r
SOO7330-001 RequBsti suomittal of application for amend to license
consisting of Tech Bpec changes t< license conditions PWR
Model Tech Specs bHadel license conditionE for TMI-2
Leiflons Learned Category A items encl Far guidance
EIBENHUT.B 0 Division of Licensing BO/O7/OS 69pp
B007OEO751 Foruiar ds IE Dnllblin E3o-l?>. "Puskibli! Lus-, <i F Em&TgBnCL|
Notifir-fltioii EIJR <TNS1 W/Lnos of [Iff-itu Pouirr " Written
reEjionse requ I retl
0'REII.LY,JP Region S. fltlantfl- tlffne -Of the Director SO/Ofi/lB
90O7H1O499 Confirms B0071 I aareom»nts u/NRC r« up erab i 1 itu of auiciliarv
feeduater flaw control valves at Facility Commitments made
re stroking listed valves a* soon 39 possible 6 longing rfc
bus 1A t, IB voltage* once pur hT
CLAYTON.F L Alabama Pouer Co fJO/07/11 Ip
B0070a&lE)S FOFUISI rla IE Cirrul.n Wr-ti; "I n«s of H&actnr CooUnt Pump
Cool 1 ng "(Natural f In u 1 ,it I iin roi.ld(<ur. " Ha UT i t ten Tesponie
requi red
O'nEILLY.JP Region J. «tliinta, Dffifc o F tli* DJtectar BD/O6/2D
B00723051O Forwards process, control prnoi-am for raduiaste
unit. as discussflil Bt 80O7O9 meeting lo/NRG
CLAVTON.F L Alabama Power Co 00/07^14 Ip
HO0707039') Foruards IE ]ni\i riept-i 'sO-Illil/HO -LO t, bO-Ji.rt/EIO-11 on
600331-0433 Wa nunc oinp 1 iani o nr.tsd
LEHISiFI f Be a ion ,1, Atlanta' R(nn.ti-r OpPi fit i uns Nuclear Support
Branch QO/Ot/FJl Hpp-
208
DOCKETED ITEMS
— BQ0707039'? IE Insp Repts 50-34B/BO-1O & 30-364/BO-ll on BOQ331-0433
Ho tinnc omp 1 1 ant f noted Major areas inspected hot functional
testing. IE bulletin follouup I. plant security
HARTIN.R D Region 2, Atlanta, Reactor Operations Nuclear Support
Branth BHADFGHD.H H Region 2. Atlanta. Office of the Director
BO/05/31 6pp
— BOO7Q70330 Revised monthly operating rapt for Apr 1980
HA1RSTQN. W Q Alabama Power Co BO/03/01 Ip
— B 007070233 Revised monthly operating rept for May I960
HAIRBTQN. H O Alabama Power Co 80/06/O1 Ip
BOO7I6O791 Forwards IE Circular B0-14i "Radioactive Contamination of
Plant Demineraliietf Mater Sys I Resultant Internal
Contamination of Personnel " Nn mritten response required
O'REILLY, JP Region 3, Atlanta, Office of the Director 00/06/24
8GO7230206 Forwards IE Bulletin BO-lfi. "Potential Misapplication of
Rosemouni Inc Models 1151 (. 1152 Pressure Transmitters
W/either A or D Output Codes " Written response required
IE Circular 80-16 also enc I Na written response required
D'REILLY.J P Region 2, Atlanta. Office of the Director 80/06/27
BOQ7510265 Forwards response to IE Bulletin 8O-OH, "Eiamlnfltlon of
Containment Liner Penetration IJelds " All containment butt
velds betueen penetration sleeves & process piping In Unit 1
radiographtd Unit 2 to be radiographed upon completion
CLAYTON, F L Alabama Pouiar Co 90/07/01 5pp
BOQ7130662 Forwards monthly operating rept For June 19BQ
CLAYTON.F L Alabama Pouier CD BO/07/11 Ip
— B00715066B Monthly operating rept for June 19BO.
HAIRBTON, H 0 Alabama Pouirr Co BO/07/01 Spp
& Reportable occurrence*. LEfti b related correspondence
BOQ7160B61 Part HI rept re Westlnghousi review of safatv. injection
termination criteria following secondary tide high energy
line rupture in/potential for damage to centrifugal thargina
pumps Concern* are applicable to facility
HAIRBTON.W G Alabama Power Co BO/06/13 2pp
B007010444 Forwards LER BO-036/Q3L-0
CLAYTON.F L Alabama Power Co BO/06/SS Ip
8OQ7160549 Informs that requested set Ions re IE Bulletin BO-10 have
been completed ti HTB availablp for review at Facility
CLAVTON.F L Alabama Pouer Co 90/O7/O7 tp
BOQ7290B59 desponds to IE Qulletin 80-11. "Masonrij Mall DB»Jgn " All
masonry ual Is, function of each wall !, relation to safety-
related equipment are luted J< Identified in encl uiaU-doiun
m mm art) sheets Syn supports sketch ui ) 1 be developed
CLAVTON.F L Alabama Power Co 80/O7/O7 9pp
BOO7350471? Btsponns to open items notprf in BQ0324 rept of map on
BQQ236-B9 re firB protection Obstructed sprinkler sys head*
uill be relocated per ratl fire protection stds
CLAYTON.F L Alabama Power Co 80/07/31 Spp
— B0070tOfl46 LER 80-036/03L-0 on BOO 528, durino perforroancB of RHR V<BlV«l
inservice test, 1A RHR heat e«chano*r discharge valve failed
to stroke close Caused by cap screw connecting valve
actuator to valve shaft coming out Cap screw replaced
HAIRBTQN, U G Alabama Power Co BO/06/29 2pp,
B007010404 Forwards LER BO-037/O1T-0
CLAYTON.F L Alabama Pouir Co BO/0&/27 Ip
—8007010412 LER BQ-037/01T-Q' on B00613, Hestinghous* notified utll of
potential for damage to centrifuoal charglnffl pump» duff to
inadequate flow following secondary side high enerflg lin*
rupture Caused by inadequate consideration during design.
" G Alabama Pouir Co BO/06/S7 SPP
R Periodic operating reports & rslated correspondence
SO07O7O163 Foruards revised monthly operating repts for Mar 1979-
Ma\ ilBO
CLAVTOM.F L Alabama Power Co 60/06/30 Ip
— BOO7O7017o Revised monthly operating rept Far Mar 1979
HAIftSTON.H G Alabama Power Co 79/04/01 Ip
— B0070701BO Revised monthly operating rapt for Apr 1979
HAIRSTON.W O Alabama Power Co 79/O5/OI Ip
— B007070190 Revised monthly operating rcpl for May 1979
HA1RSTOJJ.W 0 Alabama Power Co 79/06/O1 Ip
— SOO707OI94 Revised monthly operating rept for June 1979
HAIRSTON.M G Alabama Pouter Co 79/O7/01 ip
— B007O70199 Revised monthly, operating rept for July 1977
HAIRSTON.W O Alabama Power Co 79/09/01 Ip
— HQ0707O3Q4 Revised monthly operating rept for Aug 1979
HAIRBTON.H 0 Alabama Power Co 79/09/01 Ip
— eOO7Q70208 Bevispi! monthly operating rept for Seat 1979
HAIRSTON.HG Alabama Pou-er Co 79/10/OJ Ip
— B00707Q2I4 Revised monthly operating rent for Oct 1979
HAIRSTOtJ.H 0 Alabama Pnuer Co 79/11/01 Ip
— 8007070217 Revised monthly operating rapt for Nov 1979
HAIflSTflN.U 0 Alabama Power Co 79/1S/01 Ip
,
Alabama Power Co 60/01/01 Ip
i,"?IltllI2 nPeratlnB r»Pt TPP Jan 1980
Alabama Power Co BO/02/01 Ip
labama Power CQ SO/03/01
?>-BW707Q22B R,VM.< monthly operating rept For Mar I960
rWlBSTON.HG Alabama Power Co BO/04/01 Ip
DOCKET 5Q-3S2 LIMERICK OENERATINQ BTATIDN, UNIT 1
A Application/construction utage documents fc c or r» up on da net
B0070S03S7 Foruards NRC Ofe of Nuclear Reactor Regulation BQQ42B
reorganiiation chart Necenaru period of tratisltlon mjtd*
u/min rfliruption to ongoing activitle*
TEDEBCD.R L Assistant Director for LicBnaino 00/06/13 Spp
8007310176 Forwards NRC evaluation of OE rnpti NEDE-H_4CHC~P l< Suppl*
1-3, "Technical Basle for Use of Bquara-Root-of-Bu'm-of-
Ba.uar<is (SRSS) Method for Combining Dynamic Loadx for Mark
II Plants " Rept acceptable aubj to certain constraints
MATTBON.n J Division of Safety Technology BO/06/23 3pp
B00723000I Foruar-dt statement of policy re requirement* to b* net for
current OL applications. BE derived from NUREO-0660 t< found
in NUREG-0694
EIBENHUT.D 0 Division of Licensing BO/06/36 3pf
0007140191 Responds to Itr re facility Replacement pou*r cost reported
In NRC B00130 Itr is for fuel to operate plant Large part of
replacement pouier mould come from oil Intensity of recent
earthquake uae only fraction of DDE
SCHWGNCeR.A Licensing Branch 2 80/06/27 llpp
B0072306S1 Summary, of B00612 meeting u/Mark II owners oroup in
HethesiIa.HD re lead plant closure fc long-tarm program Moil»
should be made to oenerlc lead plant condensation
oscillation tt chuooing pool boundary loads ViewgraphB encl.
ANDERSON. C J Generic Issues Branch 80/07/03 37pp
B007I£Q283 notification of 000711 mooting ui/utll in uethe*d«,MD to
discuss certain problems u/faeility review
SELLS.D Licensing Branch 3 BO/07/11, Qpp
a°onB8t5 BOO'O^ m.cting for presentation of info rea
to NRC B00506 Itr re preliminary risk analysis Lists info to
be presented
BOVER.VS Philadelphia ElDctric Co 80/07/81 Ip,
B007250175 Notification of 8OOBOB meeting u/repr«sent«tivai from Mark
II ouinors group in Chlcaoo. 1L to discuss lead Mark II olants
chugoinfl I, C/0 load specs *
ANDER90N.C Generic Issues Branch BO/07/83 2pp
207
O rtd judicatory correspondence
Q0073 10213 Forward* Commission QOO327 memorandum t, order containing
decisions on UCB 7BQ502 petition for reconsideration of
700413 Bnnoranduin d order UCS 771104 petition lought action
r« fir* protection for electrical cables
EISENtftJT, D 0 Division of Licensing 80/04/25 B9pp
H Oaneral correspond «nce
SO07100372 Ack raceipt of Itr re cannt of facility Station it not
presently under active review Ltr uill be kept an file &
returned uhen util application for OL reviau is initiated
SCHHENCEfl.A Licensing Branch 3 BQ/Oi/33 lp
— B0071002Q9 Requests that NRC reconsider opening facility PA has not
improved radiation monitoring or emergency response since
Trll Barioui nucle-ar accidents can d ulll happen Homeowner
Insurance does not cover lose of life or damages
CLARK, C Affiliation Unknown BO/06/23 2pp
BOO711O91O Responds to 800409 Itr re const of facility Environ b safety
ravlaui ulll begin uhen util submita application for DL Ltr
will be kept on file & referred to again when review
initiated
BCHHENCER.A Licensing Branch 2 BO/06/23 2pp
8007140025 Ack receipt of BOQ610 Itr tc resolution re const of
facility Resolution uill be considered along u/nther
correspondence in future reviews relative to facility
licensing
BCHWENCER.A Licensing Branch 2 OO/06/26 If
BOO70203ii Forwards IE Circular BO-IS. "Lost of Reactor Coolant Pump
Cooling '. Natural Clrculatipn Cooldouin " tin UT>tton response
GRIER.R H Regioi, 1. Philadelphia- Office of the Director
BO/Ofi/20 ]p
O00714072B Forward! IE Circular RO-11. "Hadioac t ive Contamination of
Plant Deroinerali toil Hntur GIJK t. Resultant Internal
Contamination of Personnel " Ho written response required
ORIER.B H Region I, Philadelphia, Office of tho Dlrattor
BO/Oi/24 lp
0007310233 Forwards IE Info Notice BO-24, "Low Level Habuaate Burin)
Criteria " No written response required
BRIER, II H Region 1, Philadelphia. Office of th* Diroctnr
QO/Ot/2S lp
e007aiO312 Ac* receipt nf G00410 Itr infnrmmg WfiC of stops taken to
correct violations noted in IE Insp RoptE 50-352/79-12 fc
30—393/79—1 1
OR1ER.D H Heuiun 1, Philadelphia. Office of the Diroctnr
BO/0&/2A Spp
—0007210321 Responds to NRC B0011S Itr re violations noted in IE In*
Repts 50-3S2/79-I2 t. 30-353/79-11 Corrective actlona
uncontrolled copies of pipe support draining removed' from
field
KEMPEH.J S Philadolphm Electric CD BO/04/10 3p p
— S00721032fa Foruiards IE Inop Repta 90-a93/7-y-| 3 t. 30-393/77-11 nn
791120-3O t< 1203-31 & notice of violation
CARLSON, R T Renion 1. Philadelphia, Reactor ConatritctlOU H
Engineering Support Branch DO/03/12 Spp
8007160644 Forwards 8O062B tor re op on deuce to President Carber>0overnor
Thornburgh. Senators Bchuelker Si Haini i Representative
Ledariri State Senator Fumo, Btote HeprBaentative Rappaport fi
NHC ri halting facility const
HAHKINQ, K L Pennsg Ivanta. Btatg of BO/O6/2B 7pp
BO071B0349 Raipondi to Itr r* conit of facility Ltr uill be kept on
file Ic referred to when NRC Initiates DL revioui Facility
will not be under active review until util submits DL
application in lata 1900 or early 1931
SCHHENCER.A LUentlng Drench 2 130/07/01 lp
BQ072 50004 Ack receipt of Itr re const of plant Plant not under active
Tivliu Public coramentB ulll be considergd during review
8CHUENCER.A LlcenBing Branch 2 BO/O7/14 lp
BO07290473 Reiponds to BOD63O Itr to NRC re const h operation of
facility NRC welcomes citiion Itra Ii takes them into
eon*ld»rotlon during environ fc safety revicius Facility uill
not be revleued until OL application is received
BCHHENCER.A Licencing Branch 1 SO/07/13 Spp
I. Financial information
8O0701013B neiponda to 800609 Itr to 0 Cunningham transmitting util S-7
rigiitration statffni«nt No Inaccurate statements or financial
Inconsistency Identified
CHRIBTENBURV.E Hearinga Division BO/O6/W lp
--B0072I0330 Notice of violation from incp on 7911SO-JD A 1303-S1
» Region 1. Philadelphia OFFite of the Director BO/03/O5 Zpp
— B00731033B IE Insp Repta SO-352/79-12 !, 50-353X7-J-1 1 on 791120-30 &
1203-21 Noncomplianco noted failure to control fleaign
documents for masonry walls It failure to provide QA program
for masonry uiall subcontrac tnri
MATTllW C Region 1. Phi ladolnhia, Office of the Director
MCQADQHY.R H Floginn 1. Philadelphia. Reactor Construe tlon b
Engineering Support Branch BQ/01/OS 15pp
0007330199 Forward e IE Bulletin flO-l^, "Potential Hiaajip 1 I cation of
Rosemount Inc Models 1151 ti li:>S Pressure Transmittars
H/Elther rt or D Output Codoa " Urltten rooponao t squired
IE Circular BO-16 alau encl No urittnn rBBpon-ae required
ORItR.D H Region 1, Philadelphia. Ufflco of thu Director
BO/06/27 2pp
B007210967 Responds to IE Dullatin 90-OB Fined heflda uihich ore butt
uelded to containment penetration sleeves used in doth
unit* ftSME Code. Section 111,1974 through Hintop 1971
addenda, appl led
HEHPER.J B Philadelphia Electric l.o 8Q/07/Q2 7pp
B0073102O& Ack rpceipt of B00633 Itr Informing NFiC of atnpl tnlien to
correct violations noted in IE Insp Repts SO-352/EJO-O3 J.
BO-333/SO-03
CARLQON.R T Region I. Phi ladiOphla, Reactor Construction t,
Engineering Support Branch 80/07/03 lp
Q Inipectlon reportsj IE Bulletins tt correspondence
BOOT HOI 69 Foruiardi IE Bulletin QO-13, "Cracking In Core Spray
BpaTflors " No uritt«n response required
miER.B H Region 1. Philadelphia, Office of the Director
80/05/12 lp
8O0701023B Forward B IE Info Notice 00-33, "Loss of Suction to Emerae
Fetdutiter Pumps." N-o uritten response required
ORIER.D H Region It Phi lodBlphia, Office of the Director
BO/03/29. lp
B007B10A04 Foruinrdi IE Info Notice 80-26, "Evaluation of Contractor
QA Programs " No written response required
OniEFt,B.H Rinlori 1, Philadelphia, Office of the Director
SO/Oi/10 lp
GO071402BO Foruards IE Bulletin BO-14, "Degradation of BWR Scram
Diicharge Vol Capability " No uritten response required
ORIER,B H Region 1. Philadelphia, Office of th« Director
BO/Oi/ 12 lp
— 8007210214 Responds to NRC HOOB36 Itr re violations noted in IE Insp
Repts SO-332/BO-03 !. 30-333/00-03 Corrertlve actions OA
Issued stop iiiorli ardors on pipe rontralnt PR-PI1?
KEMPEfl.J S Philadelphia Electrir Co 90/06/23 Spp
— B007210221 Forwards 1C Insp Ropla 30-33? /BO -03 t, 30-35 3/00-03 on
BOQ323-0323 & notice of violiitlon
CARLBON.R T Region 1. Philadelphia, Reactor Operations Nuclear
Support Branch flO/05/a!t> 2pp
--B00721Q330 Notire of violation from map nn BOOS3S-03B3
» Region 1- Philadelphia. Offlre nf the Director
-H007210210 !E Insp Depts bO-352/B[>-Oa I, UO-35'l/(iO-03 on 900235-0335
Noncompi lance noted failure to preheat uield joint prior to
UBlding
HATTIA.J C , FINKEL.A Region 1. Phi ladolphla, Office of the
Director MCQAUQHY, H H Region 1, Philadelphia, Reactor
Construction !< Fnyineeriuy Support Dranch BO/05/2 1 15pp
BOQ7S80&08 Forward* IE Info Notice BQ-2B, "Prompt Reporting of Info In
Accordance W/10CFR3O 53(e) " No uritten respon** required
<M1ER,B H Region 1> Philadelphia, Office of the Director
tp
208
DOCKETED ITEMS
S RepartaOle Ot
QOD7020155 Fot-uards turnary o' B00227 meeting u/util to discuss
reporting requirements of significant design d const
CARLSON. R T Region 1, Philadelphia, fieac tor Construction !.
Engineering Support Branch aO/O'i/3'' IP
— 9007020164 Summary of 800?27 meeting w/util in Region 1 ofc to discuss
reporting requirements of sjcjnificant design !i ton^t
deFic n?nc ies
« Region 1, Philadelphia, Office of the Director BO/03/27 2pp
6007310013 f,cli receipt ot 800606 final deficiency rept ro heating,
ventilation li air conditioning damper Rept mill be reviewed
t< evaluated
CARL-GO"!.? T Reyton I. Philadelphia, Reactoi Operations Nuclear
Support Branch 6X3/06/25 fp
BOQ?24022fi Part Zl rept re defective Rosemount trip/calibr units &
transmitters supplies by GE Caused by failure of essential
iiuitth toat determines trip output logit Output of rfafectwe
units mil tie carrectDd per GE instructions
KEMPER.J S Philadelphia Electric Co 80/07/O1 Spp
B0072S0153 Part SI rept re defective GE crimp pini in electrical
connectors Cause not stated End GE refit vtates t*iet QA
procedure* have been modified to preclude defective
criafing in future
HEHPEH J S Philadelphia Electric Co BO/07/01 7pp
800)090265 Deficiency rept re Colt Industries emergency dieael
99nerator heat Bichangers Deviation between configuration at
high heat eichanger stack on generator skid t, configuration
an Jill led in seismic rept deteite*
KEMFEfi.J 5 Philadelphia Electric Co 80/07/O9 2pp
DOCKET so-a'ja LIMERICK GENERATING STATION, UNIT 3
ft Application/construction stage documents Si correspondent:*
8007020257 Forwards NRC QfC of Nuclear (lector Regulation OOO4J?a
reorganl latl on chart Necns^aru period of transition rnftdft
w/min disruption to ongoing activities
TEBEBCQ.P L Assistant On PC tor FDI- LUensing QO/ob/13 *2pp
B00731Q176 Forwards NHC evaluation of GE rept. NEDB-21010-P b tiupplm
1-3, "Tethnical Basis For Uao of Sfluaru-Root-of-Bum-of-
Squares (BBSS) Method for Combining Dynamic Loads for Hart
II Plants " flept acceptable mhj to certain constraints
MATT60N,R J Division of Safety Technology BO/Oi/29 3pp
0007330001 Forwards statement of policy re requirement* to b* mat for
current OL appl ications, as derived from NUHEO-066O t, found
In NUREO-O^fl
EISEWUT.D 0 Division of Licensing BO/O6/26 2pp
8007160131 Responds to Itr re facility Replacement power cost roportvt
in TOG aootao 16r is for fuel to operate plant Lorae part of
replacement power would come From oil Intensity of recent
aaithquako uas onlu Fraction of DBE
BCHWENCER.A Licensing Branch 2 BO/06/37 llpp
500733063! Summary of 800612 meeting w/Msrli II ouner* group in
Bethesda.rlD rs lead plant closure !< long-term praflram Hoda
thould be marie to gennnc lead plant condpnaatl on
oscillation & chugging pool boundary made Vloiuaraph* encl
ANDEnsON, C J Generic IESUDB Branch SO/07/03 37pp
6007130205 NoliFication oF 00O711 mHetinfl uj/util in l)Dth*ad»>HO to
discuES tortaln problems ui/faciHty reVioiiJ
S£tl.g,P Licenslnn Branch H BO/07/11 3pn
--8007090270 Part 31 rept re Colt emergency diese] generator heat
ejchanger* Deviation between configuration of high heat
endanger stack on generator sliid & configuration analuied
in seismic rent detected
MORIARTY.JH Col t Indus tn es, Inc BD/01/1& lp
— B007090275 Part 21 rept re Colt emergency diese] generator heat
exchangers Units 6 t 7 have been torrected by fitting shims
at bolted interface between generator skid & heat eichanoer
mountino feet
MDHIART/.j M Colt Industries. Inc BO/06/13 lp
8007250^67 Aci, receipt of B00620 final deficiency rept re 1 W
iwitchgear circuit breaker au.iliary switch cranH aasenhly
CARLSON.R T Region i. Philadelphia. Office of tfie Director
00/07/03 1 p
00073102B1 Act receipt Df 80070! final deficiency rept re defectiv
crimps in electrical connectors
CARLBON.H T HegiQn 1. Philadelphia, Reac tor Construct, on &
Ensineering Support Branch SO/O7/I 1 lp
-B0073102B6 ^gn,f,cant Deficiency Rept 14 ,-e defective crircp* in
electricg] connectors GE rept submitted per JOCFR31 provjtfea
detailed site insp info Rept end
KEMPED.J S Philadelphia Electric CQ BO/O7/01 Spp
V Congressional /Ei ecutiva Correspondence
h,u.Bt* ^pearan.e on behalf of subcommittee to testify
*il -JV; Bmraencucpla'"llri9 Pr«-*urtt f, preparoDnB5° "
TM? 2 t""""1^"ons "f I"50lis learnt from accident at
TMI Hearing scheduled For B00537
UDALL.M K HoUse of Hep . Inter.pr !, Insular Affairs BO/04/1A
D.r»tor
attitudes expressed
her or not CP
3pp
80/06/30
8007110343 «Mttvlt. that NRC SFriOUs
" 7 *»ti«T" *
Public heoUh t. s
B007250471 Suggests BOQ904 meoting for presentation DP info impendin
to NRC B00506 Itr re preliminary riiiV 0nalgsii U»t» info to
be presented
HOVER, V S Philadelphia Electric Co SO/07/21 lp
Q0072S0173 Notification DF FJOOB09 meeting iu/rBpr»»Bn tativm fran Mdrli
If oun0rs group jn Chicago, IL to discuss luad Mark II plants
chugging b C/0 load upturn
ANDER90N.C Gat.BMc Issues Dranch BO/07/B3 3p p
0 Adjudicatory cDrpoBpOndBnca
3007310843 ForuiarrfB CommiBBion B00927 memorai.dum fc ord»r cont«lnl
decisions on UCB 7£JO502 petition for reronsidHratioTi of
700413 memorandum t. order UCS 771104 petition Bought action
re fire protection for electrical Cable*
EISENHUT. D 0 Division of Licensing 00/06/23 S9pp
H General correspondence
B007I0027S Ack receipt oF Itr re const of fac i 1 i ty. Station i» not
prnaentJy onder active review Ltr will b« kept on Pile t,
n ."J1' •fl"*"""" ">•- 01" -svi*" U initl-t.d.
Licsnaing Branch a HO/06/23 Jp
°l«^! r^?B?tB tha» NRC reconsider op0nin9 f.cllit, PA h.« rot
improved radiation monitoring or emergency response «tnc.
TMI Berioui nucleor accidents cJn ft uill happen Ham*Dun*r
1"" a°es "Qt COVOT' 1QBB of liPe or "famagBB
AfFiliation Unknown HO./Oi/33 app
"""f""* to S00"01? »tr re const of facility Environ t ,«f.tu
j,m b.Bin uhen util SUbmltB «pplie.tion for DL Ltr *
6 Orl '""'"red to aBain mh.n review
rev
initiated
SCHHENCER,A Licensing Dranch S 80/06/23 2pp
h hqSl'I*I'S* B°26?S eof^W-n^net to President Carter,
.nburgh,gBnatnrE BchueHer & Heinj. Representative
HAWKINS.K L Pennsylvania, State of BO/06/2.B 7PP
0007IB0343 Responds to Itr re const of faciHtu Ltr will b> Uot or,
I U no^h8"^ t0 ^r WC 1"itl^» OL r«vieL Fa"l ty '
uill not be under active revluu, until utfl tvbnlta DL
application In late 1980 or early 1981
SCHWENCeR.A Lirenslno Branch a BO/07/01 tp
•
anch 2
SO/07/ 14 lp
DOCKETED ITEMS
209
aQ07aSO475 Responds to BQO&3Q Itr to NRC re const t< operation of
facility NfiC welcomes citizen Itrs (< takes them into
consideration during environ ti safety reviews Facility will
not be reviewed until OL application is received
BCHHENCER. A Licensing Branch 1 8O/Q7/15 3pp
Financial information
BOQ701013B Responds to S00405 Itr to G Cunningham transmitting util B-7
ragiitration statement No inaccurate statements or financial
t tic on stenry identified
CHRISTENBURY. E Hearings Division SO/06/19 lp
O Advisory Committee on Reactor Safeguards reports !i correspondence
7904120321 Rppt on Zimmer Unit 1 Requests to be informed of NRC
acceptance criteria 6 vaporiiation rate test results
Considers NRC methodology of load combination acceptable
CARBON, N H ACRS - Advisory Committee on Reactor Safeguards
79/03/13 3pp
D Inspection reports. IE Bulletins & correspondence
BQO71 40469 Forwards IE Bulletin HO-13, "(.racking in Core Spray
Spargers " No written response required
ORIER.B H Region 1, Philadelphia. Office of the Director
BO/05/1 2 lp
SOO7010256 Forwards IE Info Notice BO-23, "Loss of Suction to Emergency
Foedwater Pumps " No written response required
ORIER.B H Region 1. Philadelphia, Office of the Director
BO/OS/29 lp
BOO721O604 Forward* IE Info Notice BO-26. "Evaluation of Contractor
QA Programs " No written response required
ORIER.B H Region 1, Philadelphia, Office of the Director
BO/06/1O lp
-~BQ0721033a IE Insp Repts 5Q~3$S/?1-\Z t, 'jO-SSS/ 79-1 1 on 791130-30 f.
1303-21 Noncumpl lante noted failure to rontrol dpmgn
documents for muhonry walls '. failure to provide OA program
for masonry wall subcontractors
MATT1A.J C Rcnion 1. Philadelphia. Office of the Director
MCQAUQHY, H W Reg j on 1. Philadelphia Fteactot Construction t,
Engineering Support Granih BO/03/05 15pp
B007230151? Formal ds It Bui ! ctin CiO-16, "Potential Misapplication of
Rosemount Inc Models 1191 f, Ilri2 Pressui c Transmitters
H/Elthor A or D Output Code1. " Written response required
IE Circular BO- It dlsu end NLI written response required
QRIER.B H fleuion 1 Philadelphia, Office of the Director
90/06/27 app
B007210567 Responds to IE Bulletin BO-OB Fined heads uhic
up 1 del) to containment penetration sleeves used in bold
units ABME Code, Section 111.1971 through Winter 1971
addenda, app I led
KEMPEH.J S Philadelphia Electric Co 60/07/03 7pp
60 073 1 030 fc rttk rcLPipt of BQOh23 Itr iiifurming NRC of steps taken to
rorrect violations notfld in 1C Insp Repts 5Q-35WHO-G3 !.
50-353/80-03
CARLSON. It T Region 1. Ph i Irfdelph la, Reactor Construction t<
Engineering Support nratich GO/07/03 lp
—9007010314 Responds to NRC ROO'iSA Itr rn violations noted in 3E Insp
Repts DO 3D2/00-Q3 I, SO-35J/HO-J3 Corrective nttlona Qrt
Issued stop work orders on pipe lenlraint PR-53?
KEMPER.J S Philadelphia tlectru Co 80/OA/P3 2pp
—8007210321 Foruiards IE Insp Repts "50-353/80-03 k 50-333/BO-03 on
000S33-0335 t. notice of violallnn
CARLSUN'R T Region 1. Ph l Ijidelph ia, Reactor Operations Nuclear
Bupport Granih BO/OS/2A 2pp
-B007B10230 Notice at violation from insp on flOO'22b-O3a3
* Region 1, Philadelphia. Office of the Duector BQ/QS/Sl
lp
eO07M028D Forwards IE Bulletin BO-14. "Degradation Of BUR Scram
Dlccharge Vol Capability " No utritten response lequired
ORIEfi.B H Rpgion 1, Philadelphia, Office of the Director
BO/06/12 " lp
BOQ72H060B Forwards IE Info Notice 80-3B. "Prompt Reporting of Info In
Accordance W/1OCFR5Q 55Ce) " No uiritten response required
ORIER.B H Region 1, Philadelphia, Office of the Dlrectov
aO/Oi/13 lp
—0007210340 IE Insp Rupts 50-333/BO-03 t< SO-35J/E10-03 on 600323-0325
Noncampliance noted failure to prehejt weld joint prior to
welding
MATT I A, J C , riNKEL.A Reoion 1, Philadelphia, OfPicu of the
Director MCOrtUOHV. R W Region 1, Philadelphia, Reactor
Construction fc F.nginoering Support Branch BO/05/S1 15pp
Reportable occurrences, l-FOs E> related corruspandf nc B
BDO70ZO916 Forwards 1C Circular BO-13, "Loss of Reactor Cool-ant Pump
Cooling & Natural Circulation Cooldoun " No written response
roqulred,
CWIER.B H Region 1, Philadelphia, Office of the Director
8O/06/20 lp
Q007030139 Forwards t.ummciry of BODS27 mec>tlng u/util to discuss
reporting reiiuiremunts of signifirant design ti const
dcFlc ieneies Nu reply resetted
CARLSON, « T Region I. Philadelphia, Roactor Conatruttion i>
Engineering Support Branch E10/03/P/ lp
8OO716072S Foruiards IE Circular 60-11, "Radioactive Contamination of
Plant Denineraliied Hater Sys & Resultant Internal
Contamination of Personnel " No written response required
OfUER.B H Region 1, Philadelphia, Office of the Director
HQ/Oi/24 lp
SOO7Z1O223 Forward* IE Info Notice 30-24, "Low Level Radwaste Burial
Criteria " No wrltt*n response required
ORIER.B H Region 1, Philadelphia, Office of the Director
9O/04/2S lp
— S0070301i4 Bummary of BQQ2E7 meeting tu/util in Region 1 nfc to dtscuaa
reporting requirements of si gniFittmt design (< const
ilef ic lenc I BG
« Region 1, Philadelphia!, [)ffiLt> of the Director HO/03^27 2pp
BO0721001!) ftck rnceipt of BOufiOfi final deficiency iBpt re heating,
ventilation ft air conditioning damper Rupl uill be revieuied
ti evaluated
CARLSON. R T Region 1, Phi 1 odel phi j. Realtor Oper.itionH Nuclear
Support Branch 80/06/33 lp
ao072103la Acfc receipt of S0041O Itr informing NRC of steps taken to
eorrtct violations noted Jn IE Insp Repts SO-332/79-12 It
50-333/79-11
ORIER.B H Region 1, Philadelphia, Office of the Director
BO/Oi/26 2pp
0007540226 Part 21 rept re defective Riisernount tiip/cjlitir units J<
transmitters supplied by OE Cauund by failure of essantiel
twitch that determines tiiji output liign Output of defective
units iilill be corrected pur 6E instructions
KEMPER,J 9 Philadelphia Clpclric Co 00/07/O) Spp
-8007210321 Responds to NRC 800313 Itr re violation!! noted in IE Insp
Repts 30-333/7'7-la t, 30-393/79-11 Correcfcivo actions
uncontrolled copifr-s of pipe support drawing removBd Prom
flBld
KEMPER.J B Philadelphia Electric Co BO/Ofl/10 Spp
8007330153 Part 31 rept re il'-fettive GF crimp pins in aloctrical
connectors Caune not stated Enr 1 G£ i pp t s La ID a that flA
procedures have buen modifmS to pretludn defective
crimping in future
KEMPER J B Philadelphia Fleet* IL Co 80/07/01 7pp
-B007310326 Foruiarils IE Insp Repts 50-352/79-12 !< 50-3S3/79-H on
791180-30 h 1203-21 tf notice of violation
CARLSON, R T Region 1, Philadelphia. Reactor Construction b
Engineering Support Branch BO/03/12 Spp
6007090263 Deficiency rept i i- Colt Industries cmc-rgeni i| tliesel
generator heat exi hangars Deviation betuieen configuration oP
high heat eichangrr ntact un OPHI-I altir siid !, corifi g ura t Ion
analyiod in seigrait rept detected
KEMPER.J S Philadelphia Electric Co SO/07/ O2 3pp
-BO07iaiO330 Notice of violation from inap on 791120-30 !< 12Q3-31
* Region 1, Philadelphia, Office of the Director BO/03/Q5 2pp
— 8007090270 Part 21 rent TV Coll I'inei (jcnt y diesel generator heat
nichangers Deviation betwoBn lonf iqura i ion of hin.li heat
etchanger stack on generator skid !, i onfiguration annlyied
in seismic rept deteccud
MORIARTV.J M Colt Industrins. inc 80/OI/lf, lp
210
DOCKETED ITEMS
— B007 090273 Pfi
eichangers
:-t 21 rept re Colt
rgency diesel generator heat
zorreetetl by Fitting shims
mounting feet
MQR1ARTV. J 1
Colt Industri
B0070BOQ01 Proposed findings of fact b conclusions of lau in form of
memorandum & order affirming ASLB 7B07I4 partial Initial
decision t, advising that radon releases associated ui/U fuel
cycle are insignificant in striking coat/benefit balance
DORDENICK, D M Hearing Branch 4 ao/07/03 3Bpp
BOO735O2B7 Aek receipt of HOO62O final deficiency rept re 4 W
auitchgear circuit breaker aunlrary switch crank assembly
defect
CARLBON.R T Region 1. Ph i ladPlphia. Office of the Director
80/07/03 lp
a0O731oaBl Ack receipt of B007O1 Final deficiency rept re defective
crimps in electrical connettc-rs
CARLSON, R T Region 1, Pti i ladelph ia. Reactor Construction &
Engineering Support Branch BO/07/11 Ip
— BOQ73102B6 Significant Deficiency fiopt 14 re defective crimps in
electrical connectors OE rept submitted per 1QCFR2I provides
detailed site Insp info Rept end
KEMPER.J S Philadelphia Electric Co 00/07/01 2pp
Congressional /Elecutive Correspondence
BOG42SQ339 Requests, appearance on behalf of subcommittee to testify
on issues re emergency planning procedures & preparedness
alongi a/ifif t i = a tl ons of lessons learned from accident at
TMI Hearing scheduled for 800527
UDALL. M X House af Rep , Interior !, Insular Affairs BO/04/ li
lp
•BOO7I1033B Desponds ta 800604 Itr expressing concerns about testimony
of V ffoger.util Senior Vice President MR Denton mill meet u/
Boijer on 80063O tti discuss matter in greater detail
DIRCK9, H J Office of the Eiecutive Director for Operations
BO/O6/30 lp
— ao-07110343 Requests that NRC seriously consider attitudes eipressed by
uti.1 during BQ052-7 testimony b determine whether or not CP
is consistent ui/public health b safety
KOSTMAYER. P H , MAUKEY. E J House of Rtp BO/06/04 3pp
DOCKET SO-354 Ht)PE CHEEK NUCI.EAR STATION, UNIT I
A Application/construction stage documents t, correspondence
S007Q1O561 Forwards NRC reorjani jation chart For Ofc of Nuclear Roactor
Regulation, effective 80O42B Considerations of activities
should be made through assigned rnjt representatives Areas nf
disagreement maij be discussed through informal appeal
TEDESCD.R U Assistant Director for Licensing BO/06/13 3pp
BOO7220Q01 Forwards statement of policy re requirements to be met for
current OL app 1 icatinns. as derived From NUHEG-066O I, found
in NUHEG-0694
EISENHUT.D G Division of Litensing 80/06/36 Spp
SOO7OBO19I Forward! Qualification Summary Repts 33-32360-03 for Hope
Creek t, 33-54237-Q5 fnr River Dend reflotting documentation
of electrical equipment qualification Reata withheld (r»f
10CFFH 790)
DUVALL.DD Sou Id-Broun Doveri BO/07/OI lp
B Adjudicatory corr espondenc B
BOO70BOOB6 Proposed findings of fact I. conclusions of lau responding to
ASLAB questions or Battelle rept Findings are adopted by
TMI-2/Peachbottoin Intervenors b Ecology Action Urges
suspension OF QLs Certificate of Svc encl
KEPFORD,C Environmental Coalition on Nuclear Pouer BO/06/1S
12pp
8O070B0046 Response to ASLAB request re Deficiency 1 Urges reversal of
decision rejecting de-Ficiency re correlation between U mine
rarfon releases fc amount of U fuel Portion of Perkins
decision re corralatian muit be vacated
CAPLAN. R Ecology Action of dsiiiego HO/Ofi/20 2pp
B007O8004B Proposed findings uf fact endorsing Citiiens for Safe
Environ filing re radiation source terms from U mining fc
milling Reject* Perkins rationale fc urges development of
further evidence re failure mechanisms tt human factors
CAP4.AN.R Ecology Albion of Osiuego BD/O6/2O 4pp
H007310343 Forwards CommlHsiDH BOQ-iS? memorandum fc order containing
decisions on Ufs 7B0502 petition for reconsideration of
7BQ4I3 memorandiirti J. order DCS 771104 petition sought action
r« fira prolecfcion for electriral cables
EIBENHUT.D 0 Division of Uicensino 80/06/25 89pp
— 00070BOOD3 Proposed corrections to B00236 transcript
BDHDENICK.B M Hearing llranch 4 80/07/O3 2pp
— 80070B0004 Motion to include de minimus theory of health affect* in
800703 findings of fact & conclusions of laui presented In
form of memorandum & order Inclusion is canciatent u/ALAB-
309, ALAB-940 8c ALAD-S6K Certificate of Svc end
BDHDEWC.K Hearing Branch 4 BO/07/03 7pp
B0071002SB Order granting Ecology Action of Omega motion to file
B 00630 cubinissian re generic radon issue
BISHOP, C J Atomic Safety and Licensing Appeal Panel BO/07/07
B00731013B RosponHo in opposition nf NRC B007O3 pleading anfrtlnn
validity of Perkins record on radon releases from U mining
& milling Objects to NRC position eliminating health effect*
issues From consideration Supporting news articles encl
CAPLAN, R Ecology Action of Osiuugo BO/O7/16 13pp
80072B0333 Foruarda revised Pages 7 d 16 to licensees i-eplg to propoivd
findings of Fact submitted by other parties filed an BOO71Q
Revised pages required to correct typographical errors
Svc list encl
TRAVIEBO-DIAZ Shau, Plttman. Potts k Trouibridgs BQ/07/ai lOpp
H Oeneral correspondence
8007IBO06O Responds to SQO31 1 request for info needed far fuel eoit
study Forwards e.cerpts of UASH-740, HAfiH-1324, HASH-1330,
MASH-1400, NUREO-OOaO (Vol 4, Number 1 ) , NUREO-04BO, NUREO-OB18,
NUREG-0917,NUREG/CR-t060 t, FES
DENTON.H R Office of Nuclear f?oactor Regulation, Director
BQ/08/14 133PP
— SOO71B0063 Requests documents containing info needed for fuel eo«t
study
HILGER, W Affiliation Unknown SO/03/11 Spp
P Operating license stage documents & correspondence
B00733002B Summary of B00207 meeting m/Mark 1 owners group in Bothetda.
MD.re revisions to NRC acceptance criteria h outstanding.
Issues relative to Mark I containment long-torm program
GRIMES, C T Plant Systems nranch BO/03/21 31pp
fl Inspection reports, 1C Bulletins l> correspondence
8007140431 Forwards IE Bulletin 80-13, "Cracking in Cor» Spray
Spargers " No written response required
DRIER, B H Reolon 1, Philadelphia, Office of the Director
BO/03/12 lj>
8007010271 Forwards IE Info Notice 80-23, "Loss of Suction to Emeraoncu
Feeduater Pumps," No written response required
OR1ER,B,H Region 1, Pliiladolph ia, Office of the Director
BO/09/29 lp
0007170268 Forwards IE Insp Ropts 50-354/BQ-03 h 50-333/60-03 on
B00303-2B No noncomp 1 iance noted
CARLBDN-n T Region 1. Philadelphia, Reactor Construction &
Engineering Support Branch BO/03/30 2pp
— B007170271 IE Insp Rept* 30-351/80-03 t, 30-333/8O-03 on B00303-2B. No
noncompllance noted Major areas inspected me Id rod control,
stored equipment maint, structural steel Lit Id ins 1 electrical
work status
DATEMAN.WH , MCQAUQHY. fi W Region 1, Philadelphia, Office of th*
Director BO/05/29 Spp
Forluartls IE In«P "eptB SO-354/BO-06 I,
B00433-2S t, H9 No noncomplianco noted
CARLSDN.fi T Region t, Philadelphia, Reactor Construction &
Engineering Support Branch BOV06/C-4 3pp
800721030? IE Insp Repts 50-334/BO-06 t, 30-3S3/BO-06 on B00433-83 t a?
No noncompliance noted Major areas inspected nuncomp llinca
control, trend analysis d control of field change rfiouest
CHAUDHARY.S K Reolon 1, Philadelphia, Office of th« Directoi-
EBNETER.B.D Region 1, Philadelphia, Reactor Construe?^!
Engineering Support Branch BO/03/33 4pp
2T1
800731 Oil 2 For ward I IE Info Notice 80-26, "Evaluation Df Contractor
QA Prograns " No uritton response required
DRIER. B H Region 1. Philadelphia! Office of the Director
BO/Oi/lQ Ip
BOQ71402B4 Forwards IE Bulletin BO- 14, "Degradation of BUR Scram
Discharge Vol Capability " No written response required
DRIER, B H Region 1, Philadelphia, Office of the Director
BO/06/ 12 Ip
B007260614 Forward! IE Info Notice 80~29, "Prompt Reporting of Info In
Accordance W/10CFR50 3S(e> " No written response required
CRIER, B H Region 1, Philadelphia, Office of the Director
BO/06/ t 3 Ip
BOO7300317 Forwards IE Imp Repts 50»354/BO~OB 6 SO-355/BO-OB on
90031 Z- 16 No noncompllance noted
CARLBON.R T Region 1. Philadelphia. Reactor Construe tion &
Engineering Support Branch BO/06/13 2pp
—8007300321 IE Imp Repts 90-3H4/BO-OB t. 30-3S3/SO-OB on 600313-16 No
noncoeipllance noted Major areas inspected welding matl
control, reactor vessel non le/safe-end field change
ueJdlng & safety-related pipe welding
REVNQLDB.B D Region 1. Philadelphia, Office of the Director
TR1PP L E Region 1, Philadelphia, Reactor Construction fc
Engineering Support Branch 80/04/12 Spp
B007230170 Forwards IE Dulletin BO-16, "Potential Misapp 1 Icat ion at
Rniemount Inc Models 1191 (< 1112 Pressure Transmitters.
U/Either A or D Output Code? " Written response required
IE Circular !)0-16 also enc 1 No written response required
QniEFI.D H Rag Ion 1, Philadelphia, Office of the Director
00/06/37 3pp
0007330299 Bubmita replg to !E Dulletin BO-OB re containment liner
penetration welds No flued heads have been Installed to
date Joints are considered Class II d radiography mill be
performed
MARTIN, T J Public Service Electric I. Gas Co OF Neu Jersey
80/07/03 3pp
S Reportablo otcurrotii
LEFIa t, related correspondence
8007310269 Ack receipt of BOOb^a interim deficiency rept re primary
containment rolief valves supplied by OPE Controls
CARLSON. R T Region 1, Ph lladolphia, Reactor Construction &
Engineering Support Branch GO/ 07/11 Ip
—0007310273 Potuntlal significant deficiency rept re primary containment
relief valves supplied by GPE Controls GecJitol has completed
review of reviled stress analysis calculations Expected
completion date of actions Is BQOBIS
MAHTIN.T J Puollc Service Flectrlc !. Qa s Co of New Jersey
BO/04/29 If
0007200342 Forward! IE Imp Repts 50-334/BQ-05 ti 50-355/80-09 on
800421-29 No nancompliance noted
CARLSON. R T Region 1. Philadelphia, Reactor Construction fc
Engineering Support Branch BO/06/ 16 Epp
DOCKET 30-3S5 HOPE CREEK NUCLEAR STATION, UNIT a
A Application/construction atage documents !< correspondence
--B0073BQ246 IE Imp Repts 30-354/80-05 t< 50-3SB/BO-OS on B004S1-2S No
noncanpHancB noted Major areas inspected reactor vessel
nolil* lafe end field changes & uclding of safety-related
piping
REYNOLDBrfl D Region 1> Philadelphia. OFfica of the Director
TRIPP.L E Region 1. Philadelphia. Reactor Construction ti
Engineering Support Branch BO/Ot/lP Spp
BQ07 170654 Ack receipt of S004B8 Itr informing NRC of steps taken to
correct violations noted in IE Imp Repts 30-334/BO-02 &
90-393/80-02
CARLBON.R T Region 1. Philadelphia, Reactor Construction fc
Engineering Support Branch BO/06/ 17 Ip
-~BO07170ifi5 Forward* IE In»p Repts 30-334/BO-02 tt 50-333/60-03 on
BO0204-2? b notice of violation
CARLSDNiR T Region 1. Philadelphia, Reactor Construction fc
Engineering Support Branch BO/03/24 Spp
— B007170670 Notice of violation from insp on 000204-29
# Region 1. Philadelphia, Office of the Director BO/03/19 2pp
6007330028 Summary of B00207 meeting ui/Marlt 1 ou>nnr& group In Oethegda.
HD.ro revisions to NRf acceptance criteria Si outstandinj
issues relative to Hark I containment long-term program
T Plant Systems Branch BO/OS/2 1 31pp
S007010561 Foruardl NRC reorjiini lation chart for OPc of Nuclear Reactor
Regulation, effective BO0429 Consirteratl ons of activities
should be made through ansigiisd mgt representatives Areas of
disagreement may be dlscuisi>d through Informal appeal
TCDESCO.FI L Assistant Director for Licensing 80/06/13 3pp
0007830001 Forwards statement of policy re requirements to be mot for
current OL aapl icat ions, as ilerivud from NUI)EO-06iO & f-ounil
in NUREO-0674
EIBENHUT.O 0 Division of Licensing SO/flb/26 3pp
0007090191 Foi'uwrtf* Qualification Summary flepts 33-32260--QB fnr
Creek b 33-54337-QB for River Qend lefloctlng documentation
of electrical enuipmont nual 1 f icotlon Repts withheld (ref
10CFB2 790)
DUUAUL, D D Qould-Broun Dover! aD/07/01 Ip
Hope
— B00717CM.B2 IE Insp Repts 50-334/BO-OS & 30-3S5/BO-OS on 900304-39
Noncomp 1 iancu noted Failure to establish measures to
nuintain cleanliness of relief valve piping stores in
suppression chanber b to maintain us Id rod control
BATEMAN.M H > HCQAUQKV.R U Region 1, Philadelphia, Office of th«
Director BO/03/19 9pp
B0070209O3 Forwards IE Circular BO-15, "Loss of Reactor Coolant Pump
Cooling ti Natur*! Circulation Cool down " No written response
required
ORIER.B H Region 1, Philadelphia, Office of the Director
BO/Oi/20 1 p
8007160737 Forwards IE Circular 80-14. "Radioactive Contamination of
Plant Denlneraliied Water Btjs l< Resultant Internal
Contamination of Personnel " No written response required
CRIER.B H Region 1, PhiladeJ phiai Office of the Director
80/06/24 Ip
BO0721037B Forwards IE Info Notice BO-24. "Lnui Level Raduaste Burial
Criteria. " No urltten response required
OHIER.B H Region 1, Philadelphia. Office of the Director
80/06/23 Ip
BOO7310276 Ack receipt of BDOS2B Itr Informing NRC of itips taken to
correct violattoni noted in IE Imp Repts SO-3S4/BO-02 tt
9O-333/80-Oa
CARLBON.R T Region 1. Philadelphia. Reactor Construction &
Engineering Support Branch BO/D6/27 Ip
— B0072102S2 Responds to NRC BOD324 Itr re violations nated in IE Insp
H.pts 50-354/00-03 (< 50-3S5/BO-02 Corrective actions
documented Interline cleanliness d hired OC inspector
MARTIN.T.J Public Service Electric (, dan Co of Neu Jerseu,
B0/09/2e 2pp
C Adjudlcatury correspondoncu
B0070BOOBfc Proposed Findings of fact li conclusions of lau raipnnding ta
ABLAB questions on Dattellc rept Findinys ere adopted by
TMI-2/PeachbDttntn IntBrvanors & Ecology Action Ur-ges
suspension of OLs Certificate of Eve sntl
KEPFOIID.C [Znvlrnnmental Coalition on Nuclear Power BO/06/ IB
B007030046 HespDnse to ABLAli request rp Deficiency 1 Ur^es reversal of
decision rejecting deficiency re correlation between U mine
radon releases ti amount up U fuel Portion of Perkins
decision re correlation muit be vacated
CAPLAN. R Ecology Action of Ofiumgu HO/06/SO Spp
BD07DQ0048 Proposed findings of fact endorsing Citiiens for Bafe
Environ filing TO md tat Ion source termo from U mining 4i
milling Rejects Perkins rationale b urges development at
further evidenta re failure mechanisms fi human factors
CAPLAN. R Ecologv Action of Otuicgo BO/ Oft/ 20 4pp
BO07310243 Foruards CommisHion 1)00337 memuiendum (. order containing
decision* on UCS 7HOS02 petition foi recons I derati on of
7B04I3 memprandum (, order IICB /71 104 petition taught action
re fire protection for electrical cables
EISENHUT.D Q Division of 1 Icenslng 00/06/33 B9pp
B0070BOOOI Propofiefl findings of fatt !. cnncHitions of law in form of
memorandum Si order affirming ABLU 7B0714 partial initial
decision d advising that radon releases asccclated iu/U fuel
cycle are Instant F icant In BirHIng cost/benefit balance
BORDENICK, Q M Hearing Branth 4 BO/07/03 5Bpp
—B0070B0003 PropriseJ correctiona tn S00236 transcript
BORDENICR, B M Hearing Branch 4 BO/07/03 2pp
212
DOCKETED ITEMS
— BQ07GEQ006 Molinn [a mrlutU de minimus theory of health effects In NRC
6007O3 findings of Fact t. t one 1 u sions of law presented in
f orri of rtiemo-randuin & order Inclusion is con-Bittent LJ/ALA0 —
507.IVLAB-54O f, rtLAG-562 Ccrtificatp of Svc enc 1
BDFtDENIdK Hearing Branc* 4 HO/O7/O3 7np
B0071Q025H Order granting Ecology Action of Oauega motion to file
BOQ620 submission re generic ladon issue
BISHOP.C J Atomic fiafety and Licensing Appeal Panel BO/O7/Q7
Spp
B00731Q12H Response in opposition af NJ1C 0t07o3 pleading assertlno
validitg of Per* i ns record on racfon ie-1 eases from U mm Big
ti milling Objects to tiRC position p] ini i>a 1 1 ng health effects
t Bsuea From consideration Supporting ne-us article-s encl
CAPLflM. R Ecology Action of Qsuego BOfQ7/l& I3pp
B007250353 Foruardi revised F-iges 7 !i 16 to licensees reply t" proposed!
findings, of fact submitted h-j nther partios filed on HOO718
Rnvised pages required to correct fctfpogracli i t al errors
Svt lint encl
nZ Sham, Plttinan, Potts '- T raujbr I dgp £30/07/21 10PP
(I General correspondent
00O7300317 Forwards IE Insp Repts 9Q-3B4/80-OB t, 50-355/80-OB On
000512-16 Mo noncompliance noted
CARLSON, H T Region 1, Philadelphia, Reactor Construction t
Engineering Support Branch BO/04/13 Spp
— 8007300331 IE Insp Repts 30-354/SO-OB t< 30-355/BQ-O-B on BOQ313-16 No
noncompliance noted Major areas inspected uelding natl
controli reactor vessel noi ile/saP*-end field Chung*
uelding & saPety-ro lated pipe welding
REVNDLDS.S D Region 1. Philadelphia. Office of the Director
TRIPP L E Region I, Philadelphia. Reactor Conit ruction t
Engineering Support Branch BO/06/13 Qpp
Q0072H0242 Foruiai-ds IE Insp Ropts 80-3S4/flO~OS & 3Q-3S5/BO-QD on
600-531-25 Ho noncompt lance notod
CARLSON. R T Raglan 1. Philadelphia. Reactor Conttructlon f
Enjineenng Support Branch 30/06/14 Spp
— H007SeOB46 IE Imp Rupts 50-354 /BO-O5 !, SD-355/BO-D3 on 800421-25 Ha
noncompliancE noted Major areas inspected reactor vmel
nmile safe end field cdangea t> melding of laf » tij-rel*t«d
piping
REVNOLDS. S D (fBgion 1, Phi Udelphiaj Office of the Dlrtctar
TniPP.U E Region I/ Phi 1 adelphifl. Reactor Construction It
Engineering Support Branch BO/06/12 Spp
8007160060 Responds to 800311 request For inFo nofdeid for Fuel cast
ttudv Foriuards eicerpts nf MABH-TflO, WASH -1234, HASH- 1250.
UASH-I400.NUREG-0020 IVol 4,Nunbe-r 1 ) , NUl*E:0-n^BO, PJUREQ-O513,
(JUREG-0517, MUREG/CB-lOiO ft FE?
DENTQN, H R Offire of Nutleai Reactor Rugulati on, Director
BO/05/11 153pp
— B0071BOQ63 Renneits dotim
study
HILGEH, H Affiliation
containing luFu needed for fuel cost
nun HO/03/11 2pp
8007170654 Ac h receipt of 800420 1 tr informing NfiC of steps taken to
correct violations noted in IE Insp Repts 90-334/80-08 &
30-353/80-02
CARLSON, R T Region 1> Philadelphia. Reactor Construction b
Englneerinfl Support Branch BO/06/171 Ip
—6007170665 Foruartfs IE Insp Repts SO-354/BO-02 fc 30-359/BO-02 on
B00204-P9 & notice of violation
CARUSON. R T Region 1. Philadelphia. Reactor Construction h
Engineering Support Branch BO/03/34 Spp
Q Inspection reports. IE Bulletins I correspondent p
8007140431 Forwards IE Dulletin BCI-13. "Cracking in tare Spray
Spargers " Ha luritten reiponEe required
SRIER.B H Region I, Philadelphia, Office of the ffirecto.r
BOJ--05/I3 Ip
B007010271 ForuJardt IE Info Notice BO-23, "Loss oF Suction to Emffratncy
Fgeduater Punps. " No written response required
CRIER. B H [legion 1. Pft i ]sd Blph i a. Office of the Ou-actor
80/OV29 If
0007170360 Forwards IE Insp Repts IiO~J54/aO-03 !, 50~3S5/BO-O3 on
B00303-3B No noncorap 1 mnce noted
CARLSON, R T Region I. Phil adelpfi i a. Reactor Construe 1 1 on t.
Engineering Support Branch a{VOV3n 2pp
— B007170274 IE Insp Repts SO- 354/"BD-t>3 & 5Q-355/BQ-03 on B00303-2B No
nontompl laritp noted Major ureas inspected meld rod control,
stored equipment mai nt, struc rural steel welding t electrical
ijork status
BATEMAN.U H . MCOrtUOHi'.F! W (fogion 1, Ph> 1 arfelphia. Office of thff
Director BO/03/aa Bjjp
B00721O30B Foruardj IE Insp Repts SO-35a/BO-OA !. 50-335/BO-Ofc oil
8QQ423-2S !i 29 No none ompl i ante noted
CARL-JON, R T Region 1. Ph 1 1 adol p bia, Reattor Construe tlon t,
Engineering Support Branch ao/-Oiij/O4 2pp
--B007210309 IE Insp Repts 5Q-354/BO-0& }. 50-333/80-06 on 000423-33 & 27
No nonconpliBnce not*d Major areas inipeeted roncotnp 1 lane e
control, trend analysis & confcroi nf field chanse- request
CHAUtlHARY. S K Region I. Philadelphia, Office of the Director
E9NETER.S D Region i. Philadelphia. Reactor Construction l<
Engineerinn Support Qrancft BO/O5/33 tpp
B0072E0612 Foruardi IE Info Notice SO-3&, "Evaluation of Contractor
DA Programs " Ho written reaponsp roq.uired
CRIER, D H Region 1, Phi laJe lel>iis. Office of the Director
BO/Oi/10 Ip
1007140284 Faruards IE Bulletin 80-14, "Degradation of OUR Scram
Discharge Vol Capfibility " No uin(-ten r-esponae rsnuireil
GRIER. H H Region 1. Phi Jadplph 1 3. Office of the Director
BO/06/ IS Ip
— B007170470 Notice of violation from Insp on B002Q4-21?
• Region 1, Philadelphia, Office of the Director BO/03/19 2pp,
— 000717Q4.B2 IE In-ap Rapts 50-334/BO-02 & 50-338/BO-02 on BQ0204-29
Nnncompl lancu noted Failure to establish measures to
maintain cleanliness of relief valve piping stored In
suppresilon chamber Si to maintain ureld rod control
BrtTEMAN.UH , MCQAUONY, R W Reoion 1, Philadelphia, Office of th»
Director, BO/03/19 9pp
BO 07 020 S 03 Fnrujords IE Circular 80-13, "Loss of Reactor CooUnt Pump
Co-oling t Natural Circulation Cooldoum " No urltten rexponie
GRIEF).]] H Region 1, Philadelphia, Office of the Director.
BO/Oi/ifO Ip
H007160737 Foruiarils IE Circular BO-14, "Radioactive Contanination o*
Plant Deminerallied Water SIJB ti Resultant Internal
CcntamJnation of Personnel " No written response required
CRIER, B H Region 1. Philadelphia. Office of the Director
BO/06/24 Ip
Forwards IE Info Notice SO-B4, "Lou Level Raduiacte Burinl
Criteria " No written rBspojnse requirsd
ORIER, a H Region 1. Philadelphia, Office of the Director
80/06/35 I p
0007210376 Atk receipt of B0052B 1 tr informing MRC of atepi taken to
correct violations noted ir IE Insp Repts SO-3S4/60-OZ b
SO-338/ 80-02
CARLSON- R T Region 1, Philadelphia, Reactor Construction tt
Engineering Support Bramth BO/Oi/27 Ip
— B0072102B2 Responils to NRC B00324 Itr re violation* noted tn IE Imp
Repts 50-334/80-02 & 50-395/BO-OS corrective action*
documented interline cleanliness ft hired QC Inspector
MARTIM-T J Public Servipe Electric fc Oas Co, of Neu Jerieu
00/05/23 Spp
BO07?3017D Formal- ds IE Bulletin B0-16< "Potential MI iapp 1 icstion of
Rotemount Inc Models 1131 b I19B Pr»s«ure Tranami tters
W/Eithar A or D Output Codn " Written reiponae rvquired
IE Circular 80-16 aim encl No written responsB required
flRlER.B H Region 1, Philadelphia, OfPio of the Director
Forwards IE InFo Notice 8O-3B. "Prompt Reportirg Of Info in
^ccordancf W/10CPR30 55(ej nl (Ju mrifctetl rcspoDBB T-aqyireil
SfilER.D H Region 1. Philadelphia, Uffice Of thi> Director,
30/OA/I3 Ip
BO07a3029? Submits reply to IE Bulletin BO-OS re containment lin»r
penatratfon melds No Plued heads have bean installed to
date Joints are consldeied Class II & radiography ulll be
MARTIN, T J Public Service Electric (, Oa* Co
BO/07/02, 2pp
of Neu Jer»U
213
a Reportabla occurrences. LERs & related correspondence
8007310389 Ack receipt of BOQ625 interim deficiency rapt re primary
contflinaenl relief valves supplied by GPE Controls
CARL80N.R T Region 1. Philadelphia, Reactor Construe tl an fc
Engineering Support Branch 80/07/11 lp
— B007310293 Potential (significant deficiency rept re primary containment
relief valves supplied by GPE Controls Bechtel has completed
ravliw of revised at re us analysis calculations Expected
completion date of actions is BOOB 15
MARTIN.T J Public Service Electric i. Qaa Co of New Jersey
80/06/23 lp
DOCKET 50-356 UN1V OF ILLINOIS LDPRA RESEARCH [lEACTDfl
O Inspection reports. IE Bulletins & correspondence
6007170644 Forwards IE Circular BO-14, "Radioactive Contamination of
Plant Dinineralited Mater 3i|s (< Resultant Internal
Contamination of Personnel " No written response required
KEPPLEB.J B (legion 3. Chicago- Office of the Director GO/Oii/24
DOCKET 50-359 WILLIAM H ZIMMER NUCLEAR STATION, UNIT 1
A Application/construe tion stage documents & correspondence
BQ07020232 For war di NRC Dfc of Nuclear Reactor Regulation 000420
rtors»nii»tion chart Necessary period of transition made
w/Min diiruptlon to ongoing activities
TEDEBCD.R L Assistant Director for Licensing BO/06/13 2pp
8007030239 Notification of 000702 meeting ui/BWR licensing revioui group
in BathBsdaiMD to discuss consensus position on reactor
ivc bldg open issue
HILSONiJ N Licensing Branch 1 BO/06/1O 9pp
B007010297 Summary of H00613 meeting w/uti Is, KMC, Inc, GE, Bechtol.SMJ It
Bur gent fc Lundy in Dothooda. MD re consensus positions on
reactor svc bldg & Isolation cooling sijs bldg open Issues
from La Salle docket Status repto encl
WILSON, JN Assistant Director for Licensing SO/06/1? 46pp
6007210176 Forwards NRC evaluation of GE rept, MEBE-34010-P S< Suppls
l-3i "Tochnical Basis for Use of Squaro-Rnot-of-Sum-of-
Bquarei (SR5S) Method for Combining Dynamic Loads for Mark
II Plants " Kept acceptable subj to certain constraints
MATTSON.R J Division of Safety Technology BO/Ob/35 3pp
BO07230D01 Forwards statement of policy re requirements to be met for
current OL applications, as derivod from NUF1EQ-0660 (. found
In NUREO-0674
EI8ENHUT.D 0 Division of Licensing 00/O6/36 2pp
BO0717047S Summary of B00613 meeting w/Mark II lead plant applicants
re definition of T-quencher load spec following safety/
relief valve actuation Vieugraphs encl
BU.T H Containment Systems Branch 60/06/37 4pp
B007S30S32 Summary of 800613 meeting w/Mark II lead plant applicants re
aethodology proposed by applicants to define T-quencher load
tpec folloulng safety relief valve actuation New methodology
will be applicable to all Mark II lead plants
BU,T H Generic Issues Branch BO/06/27 3pp
BO070B0317 Submits commHnts in reEponse to NRC 800307 1 tr (i NUREe-0619,
re nod* to BWfi control rod drive tys NRC position re
cutting. capping b rerouting control rod drive not applicable
to facility Voices concern on insp time required
BORCMANN.E A Cincinnati Oas E. Electric Co BO/Oij/30 2pp
eunimaru "f aOOfalS mt'i'tinn u/M.nrk I] oumfr* group in
QetlioBda.Mn re lead plant cloaurp ft lonc-tprm program MoBs
should be maitc to gpni'nc lead plant c undensdtion
oscillation d [hugijiny pnol boundary lo.ida Wiuugraphs enc 1
ANDERSON, C J Senanr USUBS Hranch 80/07/03 D/pp
Q0072B0123 Summaru of aOOfc34 meiitinu u/util 5i Sargorit t, Hindu
BetbcuriaiMu re liriofing on re in Its of investiontinn L
corrective actions on SVL uiitpr pump muse t- vibration t<
silt buildup in Intake stitnture
PELTIbH, 1 A LiLonsing Hrancti 3 BO/0//I5 Sipp
0007230133 Notification op B007PD meeting u/DLJR - Li^ensinfl Rovi fia
Oroup in Bethe^da, Ml) to disLu^-. iimcensuE poEitinns of
OUR - Licensing Revieiu Group mi I LSD open issues
WILSON, J N Licensing Branch 1 SO/O'/lfa lOpp
0007220200 Forwards droiuinut re Category I masonry mallei per Nf
request for add) infu Ovprsiie drnuiingE available in Central
Files only
FLYNN.J D Cintitinatl Oa5 ti Flectric Cn BO/07/1B lp
0007230175 Nntification of BOOBOS meBting u/i epi osentactves from Mark
II ouiners group in Chicago, IL to discuss lead Mark II plants
chugging d f/D load spues
ANDERBON.C Ocnoric Issues Branch 130/07/23 2pp
F Security, medical, omergpntg t< fire
B00707039B Forwards Ampnd 107, tlrvis tun 10 to industrial security plan
Plan withheld (ref 10rFR2 7TO)
A Cincinnati <!,<s t. Electric Co 00/07/03 2pp
0 Ad judicatory correspondent
0007110094 Contentions por di I.CUBSI HOB ui/HRC I, applicant re OL
application Allujpr. absence of adfqu.ito corrrnunlcat ion eys
for coordination d direction of evariiation Certificate of
Eve encl
DENNIBQNiA li Zimmer Area Citucnt - Zimmer Ai on Cltiieni of H.Y
DENNISON.A B Bennison.A B BO/06/13 15pp
B0073I0343 Forwards Commission B00!)37 inemorHndum d order containing
decisions on UI'B 780302 petition for recotts idoratlon of
780413 memorandum It order UCB 771104 petit! nn sought action
re firo protection for electriral cables
E1BENHUT.D Q Division of Llrcnsing 00/0<./2!> B9pp
800 70 BO £09 Memorandum b order granting Zlmmur Area Clttions petition to-
intervene t, subjocting contention* ID LHP~FiO-14 discovenj
schedule Modifies LBP-HO-14 re admittance
BECHHDEFEH.C Atomic Safety and Licensing Hoard F'anel 90/07/03
IDpp
S 007 1JO 330 Oilier granting mtunnion until DOO7I5 fnr CommisaiDn tn
elnct uihethei tn revii'u ALAD-'i'JS
HDYLC.J C Office of thn Gncrvtnnj of th» Commiusion BO/07/09
IP
8007920563 Motion Si momnriinilum gpehing addiissjon at addl contentions
QuBstions applicant finanriiil capablHIus ti olleye-a errors,
in FbB, NUREQ-0625 Prncess ubed for c ont/benefi t anfllysi« la
contrary tn NEPA Certificate of Svc end
HDLIVCR.J Frankhouser, D I) WOl.lVCR,,) Uolivor, JD BO/07/16
ipp
V, Utility Final Safety Analysis Report (FSAtl) !i amends
B007H0369 Foriiiai-Hc Revision bb lo FSAFJ, uubmi ttod Qs Amene LOO tn DL
application, in response to NR( 791313 >« 2/ it 000117 Itrs
DOROHANN.E A Cinrinnati Oas !< EloitriL fo 00/07/11 Spp
S007170339 Notification of rescheduling of 800703 meeting ui/OUH
licensing review group in Hotheads, MD to discuss consonauu
po*itiDns on Reactor 5ys Brand: open issues Meeting
rciehedulBd for QOO709
WILSON, J N Assistant Director for Licensing 00/07/03 lp
— 8007170347 Notification of 000733 meeting ui/BUH licensing review group
in Beth*Bdai MD to discuss TMI issues required for OL
inuanca
UILBQN-J N Aisittant Director for Licensing 00/07/03 lp
— -B007140377 Revisiun (.6 to F-BAR. submi tted Qb Amend 108 to DL
app 1 ication
» Cincinnati flat «, bloclrii Cn BO/07/ II _15pp
0007210434 Fiirudr if E Certificate of Svi of Amend 108 to appl i catl ons for
QLs,in form of Revision 6t to KBAH
BOnOHANN,£ A Cincinnati OaB !. Eleitrit. To 00/07/IS gpp
0 Inspection rupurth, IE Dullttins tc i.orre<>poiiricnci
-8007170351 Notification of Q00724 meeting u/BUR licensing review group
in Bethnda,HD to introduce BUR licensing review group tt
present consensus positions for Power Sys Branch, Containment
BUI Branch t< Equipment Qualification Branch
WILSON, J N Assistant Director for Licensing BO/O7/03 9pp
SOQ7140394 FoiuiaTitB 1C Bulletin 00-13, "Crnrking in Core
Spargers " Ho WT itten rospcnsn rpquiicd
0 Region 3. Chicago. Office of the Director
214
BQQ7M0477 Forwards IE Insp Rept 3O-33B/SO-1O pn 800501-02 No
nencompl lane* noted
FIORELI-I.G Region 3, Chicago. Reactor Construction f< Enginfferlns
Support Branch BO/05/27 app
—9007110479 IE Insp Rupt BO-35B/BO-1O on BO030I-02 No noncompl iance
noted Major areas impacted corrective actions an previous
iterts of noncooip 1 iancei status of previously identified
unresolved natters tc GA records
HAVES, D H Region 3, Chicago, Reactor Construction & Engineering
Support Branch NA1DU, K R Region 3. Chicago, Office at the
Director BO/09/31 Spp
B0070H0034 Forwards IE Info Notite BO-32. "Breakdowns In Contamination
Control Programs " No written response required
KEPPLER.J 0 Region 3, Chicago. Office of the Director BO/03/28
8007230307 Forwards IE Bulletin Hct-lfi, "potential Misapplication of
Ronmount ]nc Model a 1151 & 11S3 Pressure Trnnsmittsri
H/Either A or D DUtput Codes " Written retpnnse r«q.uirtd
IE Circular 80-14 also end No written response rmuired
KEPpLER.J 0 Region 3, Chicago, Office of the Oirector BO/0&/B7.
IP
B0071S0102 Ach receipt of B 0060 3 l tr informing NHC of stop* takan to
correct violations noted in IE InBp R»pt 90-39H/flO~OB
HEIBHHAHiR F Region 3< Chicago, Reactor Constvuet ion lc Engineering
Support Branch 80/06/3O 2pp
— B0071SOJQ8 Rnopondt to NfiC BOOS 13 1 tr ra violation* notod in IE Inflp
Rept SQ-3SB/00-OB Corrective actions nuclaar »noln«riH8
pTOtaduro reviled requiring fuvl avcembly location
verification ti that Insp !< inventory records be micrnf llaei
HORBHANN.E A Cincinnati Oai t, Electric Co BO/06/03. 4pp.
BOO7O10O71 Forwards IE Info Notice 80-33, "Lois of auction to Emergency
FeeiJuater Pumpi " No written response required
KEPPLER.J 0 Region 3, Chicago, Office at the Director 80/09/29
'P
B007220I76 Forwards JE Info Notice BO-26, "Evaluation of Contractor
QA Fragrarai * No written response required
KCPPLEfl, JO Hfljidn 3. Chicago, Office of the Director BO/OA/10
BOO7240336 Forwards IE Insp REpt 80-350/00-12 on 80Q501~02, 09-09, 13-16,
19-33 1< 27-30 !. notice of rfiolation
. R F Region 3. Chicago, Reactor Operations Nuclear Support
fll-anch 80/04/10 3fP
Notice. of violation from insp on 000501-05.05-07,12-16,
19-23 t 27-30
* Region 3, Chicago. Office of the Director BO/O6/06 lp
— BOO7240353 IE Insp Kept 30-350/QO-12 on 000501-02,09-09,12-16,19-23 Ic
E7-30 Woncompliance noted failure to control cleanlinais of
cflrlt trays
DANIELS.F T , TAMBL1NO.T N Region 3, Chicajo, Office of tht
Director BO/06/06 Spp
8007Q100B.4 Forwards info to complete response to IE Bulletin 79-02,
"Pip« Support Base Plate Designs Using Concrete Einansion
Anchor Bolti » End li*ts supports for essential t, smmic
nqnassential piping sut supported by expansion anchor bolts
80RQHANN.E A Cincinnati Gax J, Electric Co 80/06/11 2pp
800714.0401 Forwards IE Bulletin BO-14, "Degradation of BUR Scram
DUcharge Vol Capability » No written responie required
KEPPLER.J o Region 3, Chicago, Office of the Director BO/06/13
5007210313 Recponds to NRC Itr re violation nnt»(f in IE Inap Rapt
50-353/90-1 a CurrsCtlve attiona debrU ti rubbish removod li
cleaning crtus aisiflned to r»actor fc auxiliaru bldgn on
UIIBtlU IChBdUU
BOROMANN.E A, Cincinnati Oa» * Electric Co BO/06/30 3pp
Supple eoo3ai retpon*i to IE Bulletin BO -03 re lo»» ot
charcoal from std adsorber cell* Perforated platei connactvd
to both top l< bottom platei u/contlnuaus ineldi pT>ncludinB
any povsiblilty for charcoal leakage.
BDROHANNiE A Cincinnati Oat & Electric Co, 80/06/30 {Zpp.
B0070B0374 Requests excsptlon to requirement of ABME, Saction XI i 1*74
edition, re pruiervite imp program. Surface tian will be
uub»titut«d for- volumetric nun on piptnR support ihaar luga
uelded bg full pen*tratian ueldino to Clasa 1 piping.
BDflOHANN.E A Cincinnati Oas fc Electric Co. BO/07/01, 9gp.
B007HS0376 Retpohds to IE Bulletin HO-08 r» mi«inat(on at contalnaant
Hner penetration ueldi, Joint detail on Penetration Typ-ai
3B>4A-C,E b g does not parmit meaningful radlographlc in»p,
due to nqre complej geometry
flCMCMANN.E A Cincinnati Can V Electric CQ 60/07^07 41pp.
0007380096 Responds to IE Bulletin 79-03A, "Longl tudlna.1 Weld D«f«ttu
in rtBME SA-31S, Type 304 8tolnl*f> 8t»el Pipe. " SA-3IB or
A-31S,Tupv 300 series funlon utld«d pipe are not matf at
facility All BA-31B or A-3tS plpinn Ut»t it, •eamlei*
BOHOMANN.E A Cincinnati Oas * Electric Co BO/O7/OB, la.
8007210397 Aek receipt of B00430 Hr informing NRC of n*ep» taknn tfl
correet violations noted in IE In»p Rept 30-33B/BO-JB.
HEISHHANiR F Region 3, Chicago, R.nctor Optratiani Nuelojtr Suaaarl
Brancft &Q/Q7/H ip
BJ00723007H Forwards IE Insp Sept 50-39B/BO-I3 on 800513.14 J. S3 t,
notice of violation
iO Region 3, Chicago, Reactor Construction
Branch 80/06/1S 3pp
Engineering
*
—8007^30073 Notice oP vlol.tion from insp on BOOS 1 3, 14 b 23
» Region 3, Chicago, Office of the Director 80/06/11 lp
—9007230087 16 !„•• flept 50-35B/BO-I3 on 800313, ! 4 t, S3 NnnCompl ianc.
noted inadequate design consideration for pipe whip
r«*tfaint connection bolt*
DANIEl.SDN,0 H Region 3, Ch,cajo. Reactor Cohslruction t
Ensineanng Support Branch VIN, 1 T Region 3, Ch,cago, Office of
th« Director Bo/06/11 4pp '
B0072aofi37 Forwards IE Info Notice BO-2B, "Prompt Reportino ep Info In
W/!OCFR5° 55<" " Nn luritt'n i-MPMi. rlawirtS
C Region 3, Chicago- Office of the Director 00/06/13
S^f^LVST*1': if c»«u"r B°-'s' "Loss or fiea*tor "»la"t P""P
Cooling I, Natural Circulation Cooldown " Ho urittsn rpspons,
r.*HOi rvti r
MEPPLER.J 0 Hejion 3, Chicago, Office of the Director BO/06/SO
DnM:urCUflr 8-'4' "»-«««*'V. Cpntamio.tion of
De.ineraii,*,! Hater BUI t, Resultant Internal
"" 0°" 2' ^r<Znn? " N° uritt" r,ip0n.e required
0 fiegian 3. Cft.cago, Office of the Director 80/06/S4
— 800721030S Responds to NRC BOOilO Ui- re violations not«d in IE In.p
Rept SO-3SB/BQ-1S Corrective actions cleanup crtwi
tfispatehetl to remove cabla pan dabrlR
BoaaHAUH'E A Cincinnati Oa. t, Electric Co 60/06^30. 8pp.
BOQ7330437 Foruardi raeponne to IE Bulletin BO-11 re Cataacru I
contreti masonry uiatli HalU are n»t subjected to wlntf.
tornado, .Usile, pip» uhip restraint or impingement loads.
Drawings forwarded under up irate cover
BOR8MANN.E A Cincinnati fias t, ElectrU Co BO/07/IB tepp.
B Riportable occurrences, LERt t, related correspontlenee'
B00702033J Ack receipt of 800529 interim deficiency rapt
rejected upon radlographlc revinu,
rt Mid.
, l pie.jpt of B006U Itr per 10CFRSO, 98(e) r« HT« in
CouId-flroun-Boverl motor control etr Review will b»
completed during future insp
B0071S0029 Ack receipt Of SOOil 1 Interim dtflelancu T-«t r» fmtivff
KSE.fVS1'1 o'1^' UiH P"tfifw 'lnal "I1* "Pon r.c.fpV *
B007100303 Ack receipt Df B003S9 final d.fiti.ncy rtpt r. rfas
" R'V "" *1! ' "•"P>»*"' -WIM futu" in./
Construction fc n.lna.Hn,
DOCKETED ITEMS
215
DOCKET SQ-36,1 SAN ONOFRG NUCLEAR STATION, UNIT 2
A Application/construction stage documents '. correspondence
BO07010S6O Forwards NRC renrgani lati on chart for Dfc of Nuclear floactar
R»OUl"tton. effective B004HS Considerations re activities
should b* made through assigned mgt ropresenVatl ve Area 6
•of disagreement may lie diseased through informal appeal
TEDEBCQ.R L Assistant Director for Licensing BO/O6/I3 2pp
BO0707Q421 Summary of HOO32B meeting u/NRC. consul tant. Energy Technolugy
Engltienrins Ctr. fc applicant in Uhittier.CA re Mechanical
Engineering Branch open items re FSAR Draft safety
•valuation. agenda & attendance list end
ROODiH Licensing Branch 3 SO/O6/li 24pp
B00702020H Notification of B007O2 meeting u/utll in Bethesda.MD to
dlicui* control room design review program
ROOD.H Licensing Branch 2 BO/O6/23 3pp
HO07OaOA73 neq.uB5ti addl info to define underclad cractrinB potential
in reactor vessel noiiles Ultrasonic eiams did not indicate
• »plicit correlation between observed cracking !i
prt/poat-heat treatment Info ronuired within tiuo weeks
flCHWENCER.A Liconsing Branch 3 BO/06/34 4pp
BQ0701CH79 Forwards affidavit of avc attesting to completion b
distribution of responses tii NRC financial analysis
dUBBtiona 1-9
BASK IN > K P Southern California Edison CD BO/O6/23 3pp
8007210463 Formal Q s <.upp lenient „! cal ulla*- 1 on fr t, Rf /mon 1 pages to
original lalruldt i ons submitted to NBl an BGOlt'l re design
calculations of electrical tunnel
BASKIN.K P GoutliBiTi California tditon Lt, BO/O7/K, 39pp
BQ073BO4Q6 Ack receipt of NRC iLtprinii' to Marine .M^IEW Committee
7910O9 refit re futility rad i ologi ( ill mrmitonng program
evaluation Detailed responDp mill be submit ted following
matl revieu
FISCHER. ML California, E.tr,tr of BO/07/1B lp
900729O62Q forwards response to NHL (J'106^-1 i p-iiuest for i
potential for unduiclad truiking in rerfct-or vessel nni
Nonlc base mttal matl ib bA- b'lB. Clu'.i II Ap|i 1 icali \<-
certification data sheets tni 1
BA5K1N.K P SouHiprn Lolifiiini.i Filis-on (-o GO/C)7/33
B00731O465 Toriuards tint review tif Marine Review Committpe rept to CA
Coastal Commission on adequacy of plant r.id ml og i c al
monitoring proflram W/u encl
CHANDLER, t- J Hearing Brand. 1 QOtQl/Jt lp
F Security, mediLal. pmergeiifij !c fire protection plans
8007090271 Advisps that revisions to safeguards contlngontu plan ulll
be submitted by 000713
DA6KIN.K P Suuttiern talifornl.1 Edison Co BO/07/02 lp
0 Ad jud icatory currespundcnctt
00079300(11 Forwards statement of policy re requirements to be met for
current OL applications, as derived from NUREG-0660 H found
in Nuneo-o694
EI8ENHUT, D 0 Division of Liconsinn 00/06/26 2pp
B0070t035S Forwards "Pro! iminary Rept on Qeologic Drilling ti
Invest igat Ion, 9an Onofre Nuclear Generating Station Units
Z It 3 tf 61 geophysical maps ( interpretations) prepared by
PJ FlachBT of CA State Univ eni. 1
BASKIN.K P Southern California Edison Co BO/06/37 lp
— D007O103t1 "Preliminary Rept on Geologic Drilling t< Investigation San
Onnfro Nuclear Sonerating Station Units B !< 3 "
A . DUBQAN.O E Mooduard-Clyde Consultants, Inc
47pp
B007030006 Rotponda to to B005I1? 1 tr 'i m.iiloiam re NRC maBting
practices on fleol Day/seismology in 01 proceeding Future
meetings ulll be held in cmweniFTit lointlon; NHC unable
to hnnnr renuest that meeting tunilnr to HOO"i2u-,-M he held
CHAMDUER. L J Henring Hranrli 1 SO/Od/a-) flpp
B007310343 Foruards rommissiun 800 h37 neinnrflTiihim ti order containing
decisions on UC<5 TBO'iOS pttitiiin for reconsideration of
7B0413 memorandum t. order UCS 7/liO'l petition souflht actjon
re fire protBttion for elertiicdl cnblPt
E1BENHUT.D G Division uf l-liensing lJO/06/a3 09p p
B007090205 Proposes .igonda (or U00717 prchearing conference in resp
to A5LB 800624 order in OL pruieeoins
CHANDLER, L J Hearing Urani fi 1 SO/O//07 2'pp
— S00701O374 Bi»ty-one 3 3 kHi high resolution seismic lines List, of
dpauina'B end
» California State Univ, Northri doc BO/06/09 62pp
Q007070334 Urges eitension of comment period for NUREO-0377 fc BOOS19
amend until BOO915 More stringent requirements, broader
applicability tt EPRI study results uarrant addl time
OILMAN, D H San DUgo flas I. Electric Co BO/Ot/30 lp
aO0783Oei39 Forwards std order for DDE uiork
MATTBDH, Ft. J niviBion of Safety Technology
GO/G&/3O 3(1 p
FIN A-1121-0
— B00723O652 Std order for DOF uiorfc "Reviey of Auxiliary Feedwater Bys
Rallabilltu Evaluation Studies for Diablo Canyon 1>
HcQuire 1. Summer I t. Ban Onofre 2 !, ECCS Reliability
Analysis of Manual vs Automatic " Issued to Sandia Labs
OHENIER.D L Division of Safety Technology FIN A-1121-0
B0070BOOO1 Forwards response to NHC OuBstion 36) 65 in geOBcietlce
area Atsa foruards Uooduard Clyde Consultants "Preliminary
Rapt on Qeologic Drilling & Investigation Songs, Unite 2 & 3,
Ban ClnoPro.CA "
BASH1N.K F Southern California Edison Co BO/07/01 IBpp
— SOQ7OHOOB3 "Prul iminary Rept on Geologic Drilling t< Investigation
Songs, Units 3 i, 3, San Dnofro. CA "
» Wooduard-Clyde Consul tdntb, Inr BO/O7/01 flOpp
e0073003S9 Submits i tcnrnmenddl iniis, i>n behalf uf Briuthiirn CA Edienn ti
Ban Diego Oas fi El et trir. f or agenda items In be considered
at prehoanng conference to begin B00717 in San Diego, CA
Related correspnndenLi
PIGVOTT.D R ChickBTing >< Oreonry EIO/O'/07 3pp
B007140032 rojuianls for conBirti ralnm, appli c ant. NHC '.Friends nf the
Earth et al 900637 eiecutod stipulation ftir t i tend ing
respond date til H007P3 re ..ppliianl'i motion fnr summary
disposition cif rontentiono la It ^ |it-r Dl pi'0(ecding
CHAND1EH L J Hearing Branrh 1 'Ati/tiJ"^ lp
--B007 1 40034 F. ei.iitt.il stipulation pittiiding time to respond to
applicant muttun fnr biimmHTij d i ".pu'.i tion of Ueuater 1 ng U
fuel cost ( onieiit ions, unti 1 flOil7/'T W/pi uponed uider
PIODTT.D R 'jDiitliprn rnlifmni.i Cdisun Co CH/^NDLCt<:L J Heariti(
Branch 1 WHARTUH. R .1 \ I ipnil- of tht Ear tn SO/O6/27 2p p
B00731013£> FOTuanls ruggti.ted nfu vet t ion of Jrt F'attprson affidavit re
util motion fui siimmnry dttptioitjnn Return of affidavit u/
signature t. nuliir i *.af ion rtqui-i ti-il if ihan,(|c!> arc '.ui table
DAVIS. L D Hear ing Dranth 4 eO/O//14 7op
8Q0731O470 Advi&i", lhat NURI •: -ui'M ti
Extra copies will he »ent ti' |irirtn'
encl rept
CHANDULR.U xl Hearinr, B(.t,,rti 1 H'l'07,,'11
H General cor
tLcd to unitti'i on BOO71&
n d,,iil,.l.!n Vt/n
B007I7O693 Advises of NHC acreptnnie of Amend T to Topical flopt,
SCE-l-A, "<!A Program " Topical rept must I.P referenced in
Chapter 17 of 9AR
HAASS.it P Quality Assurance Branch BO/O7/01 lp
B007310033 Notification of B00724 meeting u/util in Roscmead.CA to
diacusB results nf Imperial Vallpy (let 197<? earthquake
snalysi s. using Unit 1 analytUul mndoling technique
FlQCra.H Licensing Di anch 3 80/07/11 1--
QO07020IH1 Bequfiti i tin- iilfi <>t i uli i'f \-" .ng fllirrnit FiiBpqij Council nf
Tdiiuan visit (rfiiiitii cir> Ulru[in4-'i1 < uum 1 1 inlorebted in
observing u-i&ti mijt .ntnilii- ( OO|JI-T ati oil ui 1 1 lie najrir
contribution tcs MRf 13 rctijiitii' .11 r .inQiTucnl
l-AFLEDH.J D A^sistdnt DirucLur <L,I Jut* i naU ouhl lOnperation
BO/OS/13 1pt>
216
8QO7330O11 Notifies that SiJOlie r e^joi^e to If. Bjlletin 79-13. Revi si on
technique', fn r i prir t^b 1 r indtr.itiont as rflternativp to
radiograph^ L> 1 1 J iJ'ith draws proposed use of ultrasonics
P Southern (.al i f-oi in a Edison Co HU/03/O4 Ip
8007250-361 Hmpondi tc- IE Bulletin Su-PJ, "Loss of Charcoal from Btd
Type 1 1, .'-Inert, rr ,nj Adscirbtr 'tils ' Nri charLoal adsorber
filters to lir ii^tcl ,-jtti dpsiyncd tn pievpnt charcoal leakage
BOSKIN.K P SouMiern talifuiiua Edison CD BO/03/31 Ip
Q0072TO4B9 Responds ti< IE Bulletin 80-09 re potential defects in ITT
General control hydramotor octuatorH Supplied actuators iiiero
functionally tested t, e*liibited no adverse operating
defect? Valves ul 1 1 perform functions as designed
I1 Snuthern California Edison Co SO/06/16 Ip
-- BDO717O5 t9 IF Insp Fleets 'M-.ll.l /BO O'> *. --0-3fitVHO-03 on B00324-27 Ha
rtoncnmpliiiriiP noted MiijC'i .r t'-ss injected previous <ipen
i tens, tiib] B installation !• pipe supfint tc !. restraints
ECHHrtRPT J n , HEBNrtNDF^.li Region 'J, ban Francisco. Office of the
Director PDDDS, fi r Region ">. ha" Francisco, Reactor
Constrtu tn>n !< Engineering Support Brancfi 80/05/2O 6pp
B0072400BS Forusftls response to NRC fi'XM£9 Ur re violations ?>
deviations noted during BOOIOJ-l/ J/ 21-2B insp nf const
activitiP1 Ueliima fillnr nuitl removed °i di spositioncd
Becntpt work plan (1C initr ut ti one rpvised
PAPrtV.L r <3oL"(h(!rn taliH.rnia Edispn Co BQ/09/2H 3pp
— 8007^40093 rtck receipt of BtkiSZfl Hr informing NRC of atepi token to
correct it emu in NRC 800423 1 tr
SPENCEB.G S Rpgion 5. 'i.m Fidnci'.co. Reactor Construction &
Engineering ^jppcirt Braii'-h BT07/1I Ip
BOO7300303 nespnnrti to ]E Bulletin 80-OS re vacuum damage to chemic.il
vo 1 control si|.. tanks Table idfinti f y ing syn *. describing
adequacy ju<,ii Tic<it ion end Tdnks not currentli; protected
will be pruvidi-rt m/adequate protection prior to fuel load
BASH1N.K P buuthetn Califoriua Edison Co BO/04./06 3pp
8007020170 Forwards IE Circular 00-15. "Loss of ReacBor- Coolant Pump
Cooling & Natural Circulation Cooldoufn " No written retponi*
rnquirBiJ
ENQELWeN.F! H Region 5. San Francisco, Office of the Dii-tctor
BO/06/20 Ip
8007IB029B Forwards IE Circular 80-14, "Radioactive Contamination at
Plant Deminer.il i led Water Sys & Resultant Internal
Contamination of Personnel " No written response r-equlred
ENGEUKEN.R H Region 3, San Francisco. Office of the Director
BO/06/24 Ip
B007230393 Forwards IE Bulletin BO-16. "Potential Mi sapp Hcatlon of
Roscmount Inc Moduls U51 t, 1132 PresBuro Transmitters
W/Either A or D Output Codei " Written rBSponse required
IE Circular BO-1A also encl No written rPBpanse psqilired
ENOELKEN.R H Region 3, San Francisco, Office of the Director
SO/Ot/27 Ip
BD0731020I Responds ta IE Bulletin BO-OB re containment line
penetration welds elimination Utils do not utiliie Clued
heod design for penetration connections Unaccop tali IB ueldi
repaired Ji rad lograplied until ASHE code criteria met
BASKIN.K P Southnrn California Edison Co 00/07/01 Ip
0007300313 Forwards IE Insp Hopts 5O-3(bl/00~OB d 30-3iiS/00-03 on
000107-0902 No noncompliance noted
SPENCER, 0 S Region 9, San Francisco. Reactor Conn true t ion &
Engineering Support Branch HO/07/03 Hpp
— 8007300310 IE Jnsp Repts 50-361/BO-OB t, 50-362/80-05 on H00407-030B No
noncompi lance noted Major arcaa inspected const activitlnsi
including reactor prossiirp vossol !< intfrnals protection li
piping storage
PrtTE.n J Region 4, Dallas. Office of the Director DQDDB. R T
Region 4. Dallas. Reactor Construction t' Engineering Support
Branch 90/07/02 fipp
000722021^ Forward" IE Info Hot i en 00-26, "Evaluation of Contractor
CM Prngrams " No mnt^tn rf">poni,e required
ENEEUKEN.R H Rdjion "> 'j.m Fiarnisco. Office of the Director
BO/06/ 10 ip
SQ0716O233 ForuarHs Ik Infn tJotice Ru-?7 "Degradation of Reactor
Coolant- P 11 nip •itudt Mo specific action or r^bpcnse
required
O'REILLV J P Ktgiun 3, At Junta, Office of the Director GO/06/11
B007O30131 Atfc ri-ieipt of HOO^U it. mforrajng NRC of steps taken tn
lorrcct violation-, noted 1-1 IF Insp ftepts BO-361/ao-06 !.
50-362/80-04
SPENCER, 0 S ft eg inn *>. Han Frdntiscn. Rear tor Construe tion Si
Engineering Supi-ort Irancr, BO'OA/1J Ip
R Periodic operating reports !< related correspondenco
00O7010316 ForuardE "1979 Annual Operating fiopt.San Dnofrc Nuclear
Qoneradng Station," Vol 3. Biological I. Oceanograph 1C Data
Analyses Includes ET9 fni Unit 1. const EC preoperatl onal
monitoring programi for Units 2 ft 3
DASKINiK P 9i>utherii Cfllifornia Edison Co QO/O6/S9 Ip
•"-B0070103S6 "1979 Annual Operating Rent, San Onofrn Nuclear Qenoratlng
Station," Vol 3, Dfol ogical t, Oceanographic Data Analysis "
Includes ETS for Unit i, const & preoperat ional monitorini)
programs for Units 2 (< 3
» Droiuri !. Cslduiell » Lockheed Environmental SciBnc»« f
Marine Bi illogical Consul tnnts. Inc . BO-RD-lOO 80/06/2!)
HQQoa
8OO7O2O149 RespunU--, tu NRC B00439 Itr re violations noted in IE Insp
Rppts 50-3&1/BO-06 f- 50-362/SO-04 Corrective actions welding
filler motl removed ! rfi sposi tioned
}. T SnuHiern California Edison Co SO/O9/2B 5pp
0007100362 roruarils "Biological t, Oieanograph i( Data Analyses ETB for
Unit 1, Const Monitoring Program for Units 3 !i 3,
Prooperational Monitoring Program fur Units H (i 3 & Special
Studg re IChthyoplvmHon, " Vol 5 for 1979
DTTOSON.H L "ioutliBrr) California Ediaon CO flO/06/30 Bpp,
BOQ702OJ58 Ppruiftrd* IE Insp Septs 10-361/BO-O6 (, 50-362/00-04 on
B0030J-31 t, notices of nolation '< deviation
SPENCER. Q S Region 5, Bar, Tranciscu. Reactor Construction !.
Engineering Gup pur t Branch QO'04/29 2pp
.f, fJotiip of violation from insc on 000301 -11
* flegsun "i Snn F-p,»nr i SCK. Kfficp of tht Director BO/04/24 ip
— B00710026B "Biological !, dceanugraplii c Data Analgses ETB foT> Unit 1<
Const Monitoring Program for Units 2 & 3, Preoporational
Monitoring Program for Units 2 & 3 & Special Study re
left thijoplanJt tun, " Val 3 for 1977
rtMBCRO.P J nratun £i Calrluiell ANDERSON, D T UoekhBed
Environmental Scienres ADORADi K Marina Biolooical Coniultnnti,
Inc . 00-RD-100 BO/OA/TO BOOpo
[7-v Notice nf devistii," from insp on SOO301-31
Rooinn "i <3an Frfinciscp HFficp of the Director BO/01/54 Ip
80070201^1 IE (nip F(P(jt* ^0 Jil/BO 06 *, SO-362/0'}-04 on B00301-31
Mom omplunce noted ^^l]ure to -.tore high strength bolts
in rnannrr dimtlii.g i_orro-,ion ', failuitf to rontro! £7010
welding elpcM u.Jr.4 at 30 ft Mtvation
PATfc.R ,i Bi'Dion ri, ^sn Irdiicisco. fjffne of the Director
DC1DDS R r Pi.g,on '-,. ?an Tisni-isco, Heactor Construction (,
5pp
oimairi' if (nio rjoiup HO CQ, Prompt Reporting of Info in
Act oritani. •• li 1'" F''',(i Vjiei " Mt, iiiritten respdnst required
ENGELKJTH, P H I"FI^H "i iMlb lianci'-i.o Office of the Director
SO'Ot, 13 Ip
S Reportable occ urreni. PB, I.ERs {, rulated carrBspondence
0007090330 Forward* Ciniil deficiency rept ro failure of expanilon
joints in safetu-relatod pipins oys durinu startup testing
PAPAY.I. T Soutliern California Edison Co 80/06/37 Ip
— S00709033/ Final deficiency rept re failure of expansion joint* In
safaty-relati'd piping sys during startup tnstina Defornnd
joints will !>o removed tc returned to manufacturer for
analysis Datd sheet review Mill be completed by B007SO
« Southern CaliTorriia Edtson Co 80/04/27 app
0007SBOH3 Ac* raieipt of SOOA1 1 ameniJetl final deficiency rept r» lack
of qualification lusting documentation for repaired pow»r
cable
IINOELKEN, R H Region 5, 9on PiantisLO, Office of the Director
BO/07/0? Ip
DOCKETED ITEMS
217
BQ07310493 Confirms 600711 telcon re editorial error in 800627
final deficiency rept re failure of eipaniion jointa in
»»f etij-rel*tBd piping sys during startup testing Failed
•ipansion joint \aas in component cooling water sys
NUNN.D E Southern California Edison Co 50/07/11 Ip
BOO7230379 Final deficiency rapt re lark of nondestructive surface
examination of weld repair excavation cavities prior to
rBuelding Coda Cases N374 !< 275 approved to provide
alternate acceptance e.riteria to ASME, Section 3
PAPAV.L T Southern California Cdison Co BO/O7/15 flpp
DOCKET 50-363 SAN ONOFHE NUCLEAR STATION- UNIT 3
A Application/construction stage documents t< cnrrospandenct
B007210463 I r.ru
original rait
calculation',
BASK1N, K P
00072804616 Acfc retejpt of NRC riv purges tn M.irino flevieu Conirrii tti'e
791009 rapt re facility radiclnguril monitoring prngr.im
evaluation DetrtiU-H Tt>ipijTn>L> ui I 1 bt s>ulini i 1 1 eil tullnuiing
matl review
FISCHER, ML i-riliror'iia. llabu »f HO/67 '19 Ip
8007290630 (-•oruards response t& finr QOH6P4 ic
potential For undevt lad r racking in rerirlor
Nonle base met,.] mail 15 Sft WO ( \#i* II
certi f iLdtinn datd sheet*. nut 1
DA5KIN,K. P Suolhurti C.ilifninia Edi'on Cn
-,t for info re
isel noiiles
l I r.ible (iiatl
"37pp
B007Q1O56O Foryarda NRC reorganl latinn chart for QFc nf Nuclear Reactor
Regulation, effective 80Q42B Considerations re activities
should be made through assigned mgt i epresentat) VB Areas
of disagreement may be discused through informal appeal
TEDESCO, Ft L Assistant Director for Licensing BO/06/13 2pp
0007070421 Summary of BOO528 meeting ui/Nfif c onsul tant, Energy Technology
Engineering Ctr.d applicant In Whittier.CA re Mechanical
Engineering Branch open items re FSAR Draft safety
evaluatl on. agenda & attendance list encl
RDDDi H Licensing Branch 3 80/06/16 Hflpp
F Security, meoicaj, emergency J. firi> protection plans
Q0070803/1 Advises thst revision' hi '.
be submitted by 0007 IB
DA8KIN.K P Southern ralifnr.ua Edi
ft contingentij plan uill
00/07/02 Ip
B0070Z020B Notification of B00702 meeting iD/utll ii
dticuss control room design review program
RODD.H Licensing Branch 2 80/06/23 3pp
Gethesda.HD to
Q Adjudi
S007020i73 Requests add) info tn define underclad cracking potential
in reactor vessel noizles Ultrasonic eiamn did not indicate
• ipltcit rorrelatlon betueen observed cracking t>
pre/poB t-heat treatment Info required uiithin two weeks
BCHWENCER.A Licenaing Dranch 3 BO/06/21 4pp
0007010479 Forwards affidavit of svc attesting to completion &
distribution of responses to NRC financial analysis
Questions 1-9
BASKIN.K P Southern California Edison Co BO/06/25 3pp
BO 07 23 0001 Forwards statement of policy re requi rumen ts to be met for
current DL appl icaHonii as derived From NUREG-0660 f, found
in NUREO-0694
EIBENHUT.D G Division of Licensing BO/06/26 2pp
B00701039B Faruiards "Prel iminai y Rept on Oeologtc; Drilling &
Investigation! San Bnofre Nuclear Generating Station Units
3 b 3 b il geophysical maps (Interpretations) prepared by
PJ Fischer of CA State Univ encl
BASKlNiK P Southern California Edison Co BO/O6/27 Ip
— 80070103i4 "Preliminary Rept on Geologic Drilling & Investigation San
Onofre Nuclear Generating Station Units 2 A 3 "
DARNEICH.J A . DRDOAN, 0 E Uooduard-Clyde Consultants. Inc
BO/Oib/37 47pp
— B00701O374 Slity-atie 3 5 hHi high resolution seismic lines List of
drawings encl
* California State Univ, Nnrlhridge BO/06/09 62pp
B007090234 Urges ettcnslon of comment period For NUREG-0577 t, B00319
am*nd until 80Q915 More stringent requirements. broader
applicability & EPfil study results warrant addl time
OILMAN. D U San DJeoo das & Electric Co BO/06/30 Ip
BO070BOOB1 Forwards response to NRC Question 361 65 in geoacience
area Also forwards Wood ward Clyde Consultants "Preliminary
Rapt on OBO log ic Drilling & Investigation Songs. Units 3 b 3,
San Onofre, CA "
DA5KIN.K P Southern California Edison Co BO/O7/O1 IBpp
900703000ft Responds to to BOOM1' Hi f, m,n J ijrflm re (IFiC jneeling
practices on gui' 1 i>tjy/selsiriul oqij in 01 pi IK end i\iij [ut-iire
meetings uill he held 111 nin'/pnii'nt Iccdt i oris NBt unflhle
tn honor i eiiue'.t Itiflt meetimi iimllni tn Q 00520 r!l be held
CHANDLER, L J Huarinij DTsruti 1 BP/nf>t !.-i flpp
80073I021U Forudrito roinmission 9()0!'«!7 mefnuraiiilum * order containing
deciainnG nn UCS 7fl03(W petition tor recon'- nlcr.it-ion of
7B0413 memorandum !< older UCb /7HIM petition sought fit tion
re fun prolrLtion foi eluchiinl cohl["i
EJSENHUT. D 0 DivlQinn 0<- i 1 1 I?II5 ing ail/06/23 97p|>
90070902011 Propo'.i's agenda tor 00071,' preliCiir
to ASLQ 30062*1 nrrtoi in OL IIT en mil inq
CHANDLtn.L J Hearing flr.incti I E)0'07/O7
conference in lesponso
0 0 0730 03 S1/ Submits rptommend.il I Dns,
San Diegb Gcis t< £1 ec trie, fur sain
at prehearing tnnf vi eiice ti> Itcuiii
Related correspondents
PlflVOTT.D R Chickering f, Hrwiior
i luh.ilf of hiiuthern CA Edison !,
d ittmE to be c on5 i rfered
tiOO, 17 in Ban Diego. C/)
ij eO/0'/07 Jpp
B007MOOJ2 forujards 1 1>? consuloi-.itinn, ,ippl i c antp (IRC h Friends of the
Earth ct al 000/'J7 BiBcuted E I ifiiilntion f&r ritcndirig
response dal<» Lo B007.-'3 rp ,ip|i| n ,ints motion fur Mimmriru,
disposition nf Contention' \n ' v ptr 01 prnreeding
CHANDLEII.L J Heannq [lr.ji)Lh 1 tiO/u7/Ot Ip
— B0071'1007'l tiei tiled it Ipu Lit i OTI en tend ing I inn< tn responij to
applic-inl mttioti Foi "UrturiLirij d j ',pni,i ti un uf fl tualsr ing U
fuel cost i tin ten turns uritii t]007,'l W/piupucifd mdcT
P1G01T.D R Utitithcni l,,IiH>rnm Fdison <"u tHANPLCR.l J Hearing
Oranch 1 UHAH TfJN, H J I i lends nt the Ldrtli SO'Oh/27 2pp
B0072i043i Fonudiils Migqeileil ntw , IT*, ion m 0 M Fa t-ter 5 on affidavit re
util mution for summary iti i>D-ition F'etuj1!. of af t'ldiwit \aJ
signature d notar i int ion ionm".tPil i H ili-ingei arc suitabl-o
DAVIS. L 1) Huai ilu| nr.inch >1 80/07/14 7fp
B00731O470 AdvlSBt thai NURE(, 0674 trflnGfluttod iu nflrttffQ
Extra tuples uill l<e 1 ent Ln pHrtic-. iuhi>ii iW.i> l<iti 1 o U/n
enll rept
CHANDLER L J Hearing Hr.n.Lh 1 nn/U7 <*-[j Ip
— QOO/OfiOoaa "preliminary Rept i>n Qpolngic Drilling !< Investigation
Bongs. Units 5 & 3, Ban Onofre, CA "
* HODduiarit-Clydc Consultants, Inc BO/07/01 AOpp
8007170693 Advi»en of NRC acceptance of Amend 3 to Topical Repti
SCE-l-A. "QA Program " Topical rt-pt must be referenced In
Chapter 17 of 5A8
HAASS, W P duality Assurance Branch 80/07/01 Ip
H Oeneiol corrf-punileni e
B00702O1R1 Reqll||^^•, i ori'.i ifni ,il ion »f h.wing rtlumli Ene^Bij Touncil of
Taiwan visit farility on fiOdMI 0^ fiiuniit inferiisted in
Observing waiLu nipt dttivilifci Coo|.ti a+ioii uull lie inajor
contribution la NRC eiiJ.i.irigi' ni mngpmHnt
LAFLEUR.J D As&ii t.int rnrpttur for Inl ernalioi.dl (ooj)BTation
BO/OS/13 3pp
8007S10093 Notification of 800754 minting ui/util in Rosemead. CA to
dlicusa results of Imperial Valley Oct 197? earthquake
analysi E. using Unit 1 analyrnal modeling technique?
fiOTJD.H Licensing Branch 3 BO/07/11 ?pp
218
a Inspection reports IE Bulletins. I. i orr eapondonce
000733001! Notifies that BOOMS ra'ponse to IE Bulletin 79-13. Revision
5 indicated util proposed iftiliiing ultrasonic examination
technique* for reportable indications as alternative to
ratli ography (Jtil withdraw' proposed use of ultrasonics
.C P Southern California Edison Co 60/03/04 Ip
S00729D361 Respond., to IE Bulletin BO-O3. "Los* of Charcoal from Stfl
Tune II. 2-Inch, Tray Adsomei Cells " No charcoal adsorber
cells have been ipieived frum manufacturer Charcoal adsorber
f 1 1 1 er-i tf be \>*-ed are designed to prevent charcoal leakage
BA5K1N.K P southern California Edison Co 80/O3/31 Ip
SD07170530 Forwards IE InEp Repts -iO-Jil/BO-05 t. 30-363/BQ-03 or.
BOQ334-37 No nuncump 1 lance noted
SPENCER, 0 B Regifin 5- San Francisco. Reactor Construction &
Engineering "Support Branrh HO/O5/30 3pp
— B007170939 IE
n*p Repta 50-36I/BO -OS t 30-362/BO-03 on B00334-37 No
noted Major areas inspected previous open
items, cable installation *• pipe supports b restraints
ECKHARDT.J tl . HERNANDEZ, G Region 5. Ban Francisco, Office of the
Director DflDDS, H T Region 5, Ban Francisco. Reactor
Construction J. Engineering Support Branch 80/05/SO fipp
S0072400BB Formar.) 9 response to HRC 800429 Itr re violations 6
deviations noted during BQP30J-I7 t. 2I-2B insp of const
activities Welding filler mall removed t< di sposi tioned
BechCel uort plan (1C instructions revised
PAPAY.L T Southern California Edison Co SO/OS/29 Spp
— BOO7S4Q093 Acfc receipt of H0052B Itr informing NRC of steps taken to
tarred items ir, NHC B0042B Itr
SPENCER. C S Reglnn 5. Ban Francisco. Reactor Construction 1<
Engineering Support Branch BO/07/11 Ip
9007030478 Forwards IE Circular BO-13, "Loss Of Reactor Coolant Pu»p
Cooling !< Natural Circulation Cooldown " No written response
ENGELKEN,R H (legion 8. San Francisco. Office of the Dlnctor
8Q/Q6/30 Ip
B0071Q0392 Forwards IE Circular BO-14, "Radioactive Contamination of
Plant nemineraliied Water Bus d Resultant Internal
Contamination of Personnel " No written response required
ENQELKEN.R H Region S, San Francisco- Office of the pirector
Ip
S007230393 Forwards IE Bulletin 00-16, "Potential Misapplication of
PoBsmoimt Inc Models i!51 d 1132 Pressure Transmitters
H/Either A or D Output Codes " Written response required
IE Circular 90-16 also end No written response rea,uirod
ENQELHEN.fl H Region 5. San Francisco. Office of the Director
BQ/Q6/27 Ip
8007310201 Responds to IE Bulletin 80-00 re containment line
penetration uelds examination Util* no not utilin flu««
head desian for penetration connections Unacesptahle welds
repaired k rad ingraphed until ABME cdde critsria mat
BrtBKIN.K P Southern California Edison CD 80/07/01 Ip
00073D0313 ForuarDS IE Insp Repta 5C-3A1/BO-OB ti SO-36S/BD-OS on
000107-0903 No noncomp 1 ionce no'ted
SPENCER. O S Region S. Ban Francineoi Reactor Construction b
Enpineenng Support Oraiich 80/07/93 Hpp
— B00730031B IE Insp Repta 5O-3A1/80-OB (t SO-36S/BO-OH on B00407-030Z No
nDntompliante noted Major areas inspected com* activ(ti»i,
including reactor pressure vessel & internals protection fc
piping storage
PATE.R J Region 4. Dallas, Office of the Director BODDB, R T
Region 4. Dallas, Reactor Construction * Enaineermu Support
Braneli BO/07/03 bpp
HOO7300303 Responds to IE Bulletin 00-05 re vacuum damage to chemical
vol control 6iJ5 tdnks Table identifging sys t< descrioing
adequiry justi ric.ifion and Tanks not currently proltcted
ul 1 1 be provided u/adequate protecEion pi ior to Fuel load
QA5KIH.K P Southern California Edison Co 90/06/06 3pp
0007220247 Forwards IE Info Notice BO-26. "Evaluation of Contractor
OA Programs " ND urittei) response required
ENSELHEN-R H Region 5. 5ar> Frantiscoi Office of the Director
BO/06/10 Ip
0007030631 Ack rwruipt nf 800P2Q Itr informing NRC of step* taken to
correct violations notsil in It fnsp Hepts 50-36I/BO-06 t
30-363/BO-04
SPENCER. 0 S Region S, San Trancisto Realtor Construction &
Engineering Euppn'l Branch SO/OA/13 Ip
— -B007O?OI fl9 Responds tn NfiC 000439 Itr re violations noted in IE Insp
Repts 50-36I/BO-O6 *> 5Q~3l<3/BO-Q4 Corrective actions melding
filler matl removed t disposi tinned
PAPAV.L T Suuthern California Edison Co 00/05/2B 9pp
R Periodic operating reports d related correspond snco
B007010S16 Foruards "1977 Annual Operating ReptiSan Onofru Nuclear
Generating Station. " Vol 3, Biolofliifll b Oceanoflraphie D*t»
Analyses includes ETB for Unit 1. const fc preoperatlonal
monitoring programs for Units a tt 3
OASKIN.K P Southern Californio Edison Co BO/OA/2B Ip
-- -9007010326 "1977 Annual Operating Rept.San Onofre Nuclear Osneratlng
Station." Vol S.Diologlcal h aceanographlc Data Analysis "
Includes ETS for Unit 1. const !< preoperational monitoring
programs for Units 3 ti 3
f Drown (• CnldiuBll « Lockheed Environmental Sciences, »
Marina Bioloflical Consultants, In! . BO-RD-100 DO/06/BS
BDOpp
800710026S Foruards "Bioloolcal tt Dceanooraph Ic Data Analyse* ETS for
Unit I, Const Monitoring Program for Units S fc 3.
Praoperatianal Monitoring Program for Units S d 3 d Special
Study re Ichthyoplankton, " Vol 3 for 1979
OTTOSON, H L Bouttiorn California Edison Co 00/0i/30 Hpp
B007O3OI59 ^orlua^ds IE Insu Repts 30-361/80-06 & 50-363/80-04 On
B003OI-31 !, notices of violation !< deviation
SPENCER. 0 S Region S, Sun frnncisco, Reactor ConstrmKion t.
Engineering Suppr.rt Drarich QO/O4/39 Spp
BOO702O16n Notice of- violation from insp on 000301-31
» Region 5. 'Sir- FranLiscn. Office of the Director 80/04/24
B007020!"'S Notice of fleviation from imp on S0030I-31
* Region 5. ^BTI Francisco. Officp of the Director SO/Ofl/34
8007020191 IE 'riBp Rept$ 5C-361/01-06 t> '•0-36P/E10-04 on B00301-31
Noncompl iflniH noted failure to store high strength bolts
in manner a^njilir'g roncsion !i failure to control E701B
tjelding plertrode-. at 30 ft elevation
PATE, ft .1 Rcini-n 5, Han (ranciMo, Offire of the Director
DODilS.R T Reglmi "ip Han Frnncisco, Reactor Construction 6
Engineering Suppiirt Brant.fi ai)'04/34 Spp
Foriuarus IE Info Notiie 80-20, "Prompt Reporting of Info in
Accorddrice W/ iflCFP'jQ i>9!e> ' N« ui i tlen response required
£NOE(-.HEM,R H Peg'on S. Sdn rraurinco, Office of the Director
Ip
P*5pomts to IE nullDtin flO-t»9 re potential defects In ITT
General contrul hyilrayfiotof actualnrb Supplied actuators tuere
functlonailu tp^te'l !• e<hihjt-?[t no atfvprse opBratlng
defects V.tlvp<i uitH perform Punttions ai designed
flASKIH.K P im.tt.dTn CdUKrina Edison Co BO/Ofi/lfi Ip
— B00710O268 "Diological t< Oceanographlc Data Analyt>s: ETB fur Unit 1>
Canst Monitoring Program for Units S fc 3, Pr»OpBrfltlorifll
Monitoring Program for Units S tc 3 Si Special Btudy ri
Ichthyoplankton," Vol 3 for 1979
AMBEflO>P J Drown t, Calduell ANDERSON, D T Lockheed
Environmental Sciences An0flAB. K Marine QlolDplcal Consultants,
Inc . 80-RD-100 BO/06/30 OOOpp
B Repertable occiirrencBs. LERs ti related correspondence
B007090330 roruiards Final deficiBncy VHpt re Failure of axpiinsion
joints in safety-related piping sV5 during startup testing
PAPAV, L T Southern California Edison Co BO/06/S7 Ip
— B007090337 Final deficiency rept re failure of fflxpaniion joints in
safety-related piping syt during startup testing Difformffd
joints will be removed !> returned to manufacturer for
analysis Data sheet review 141 11 be completed by B 00720,
* Kouthern California Cdiaon Co 80/06/37 2pp
BO 072801 4 3 Ack receipt of 800611 amended final deficiency rapt re lack
of1 qualification testing documentation for ropalr&d power
cable
ENOeLKEN.fi H Region 9. Ban Francisco, Dffici of the Dir»ctof
BO/07/09 Ip
0007210493 Confirm* 300711 tolcan re editorial error in 800637
final deficiency rtipt re failure of expansion joint* In
safety-related piping sys rfiirino startup testing Failed
expansion joint wrtt In component cooling uatvr *<!*•
HUNN, D E Southern California Edison Co BO/07/11 Ip.
DOCKETED ITEMS
219
H007230879 Final deficiency rept re lack of nondestructive surface
• lamination of weld repair eicavation cavities prior to
residing Code Cases N274 & 275 approved to provide
Alternate acceptance criteria to ftSME, Section 3
PAPAY.L T Southern California Edison Co BO/07/1S 4pp
DOCKET BO-363 FORKED RIVER NUCLEAR STATION. UMIT 1
A Application/construction stage documents t< correspondence
8007020219 Forwards NRC Ofc of Nuclear Reactor flogulfltion BOOflEB
raorflani ution chart Necessary period of tranntinn mada
aJmln disruption to ongoing activities
TEDEBCD.R L Assistant Director for Licensing BO/Oi/13 2pp
BOO7S30001 Forwards statoment of policy re requirements to bi
current OL app 1 ications. as derived from NUREQ-OfidQ t- found
In NUREO-0694
EIBENHUT.D 0 Division of Licensing SO/06/S6 3pp
9 A-it judicature, correspondent
ils IF Info null
BOQ7310243 Forwards Commission BOO5S7 memorandum t. order containing
daciclona on UCB 7B0503 petition far roc onsi deration of
7BO413 memorandum d order UC9 771104 petition sought action
re Fire protection for electrical cables
EIBCNHUT.D 0 Division of Licensing 00/06/35 B9pp
H 0«n*raJ corresponilence
00O7180060 Responds to BOO31 1 request for info needed for fuel cost
study Forwards eicerpts of UA3H-740, WASH-1224, WftSH-1550,
WASH-lflOO, NUREO-0020 (Vol 4, Number 1 ) . NUHEO-04BO. fJUFlEQ-0313.
NUREO-0317, NUHEO/Cn-1060 t. FES
DENTaNiH R Office of Nuclear HeactoT Ilenulation, Director
80/OS/14 133pp
8007330121 Fot-iJJid". 1C fiulKUt, [30- 1ft, 'IVten
Rosemounl hie Models 1191 ', ] 15J Pi i>t,euro T
W/Eithor A or D Dutpiit (ndf. " Wiitten re-sp
IE Circular fit) 1(> .iKo end Nil unit en Te'p
CtniER.BH Reinun 1, Ph i Imlelfihin. Clffirc
BO/Ofa/E? 2pp
I cvul FtaduastB Di
il Misapplication of
I te
r the Dirpttiir
5007070975 neqilt'.ts assignment n r rpviisunr •< B't
tar TMI-2 artnin plan i Ian,-, li'.tod in ntlst lii>i(
Submits licensing jtfiudulo flei|uo--.tc[l drtte foi
evaluation input is BOG62!)
TEDEECQ.R L A!><> i bt.int Ditfttdi toi Ln-tnting
np 1 etl an is te
9pp
Q007020370 fldvitii'j i>F inter irn sitnini i oqnit cd for pl.int operation
pending final rt^soliition of rtTU'i rancor ns A TUJj Biflergcntij
operating prutuilutp must bt luhnutttil Inj BPObSCl !. iitiprcwod
prior to issiMnip »f full pout r Dl_
TEDCErO.R L Assistant Direttur for Liceriung
0007010J37 forward* liiiinui-t Foi .iddl itif'i nDedi'il t-ur iDntinuing
of OL appl iriitinn per BUOtJl tulruii Infu must tip Eiit.in>ttecl
bij 0006,37 or NHL iniormod nf iuntraiij in -P^UII rtiiys
gCHHCHtER, A Licensing biniuh .' f!0/06/l/ bpp
— 8007100063 Requests documents containing info needed for fuel coat
study
HILOER.U Affiliation Unknown BO/03/11 2pp
900/O20fl7^ Foruj.irdo reqini^t <-<>r .iridl info to cuntiiu
application Info should bt submitted tin SOOAIO
8CHWEHCER.A Lict-nsirifi Dmni n ,' fi'T/Ob/l'l tpp
Intpoctlon reports. IE Bulletins d correspondence
B00717O993 Forwards IE Insp ll»pi 50-363/BO-01 on BOQ306 No
norcomp 1 lance noted
CARLSON. R T Region 1< Ph i ladnl ph in, Reactor Construction &
EnsitiBor-ing Support Branch BO/05/33 3pp
— H007170S79 IE Insp Rapt 3O-ad3/BO-01 on HOQ506 No niincomp 1 lance noted
H-fljar areas inspected OA progriim for storage E< maint of
equipment, matl s !< structures during suspension of const &
status of outstanding items
NARROW,!- Region 1. Philadelphia, Office of the Director
MCOAUOHV. R W Region 1. Philadelphia, Reactor Construction t.
Engineering Support Branch 80/05/2O 5pp
BOO7O102B3 Forwards IE Infu Notice 80-33, "Loss of Suction to Emiirijencij
Fa*dW4t»r Pumps " No written response required
DRIER, B H Region 1, Philadelphia. Office of the Director
00/03/29 lp
90072 lOSiB Foruiards IE Info Notice BO-P6, "evaluation of Contractor
OA Programs " No written response required
DRIER, fi H Region 1, Philadelphia. Office of the Director
BOy 06/10 tp
9007160316 Forwards IE Info Notice 00-27, "Degradation a! Reactor
Coolant Pump Studs Mo ipecifir. action or response
raqiiirad
CRIERiB H Region 1, Philadelphia, Clffico of the Director
BO/06/ It lp
0007010424 Advm ; Ih jl am.u., I u;a<n f-if tur i fit tuio unit p
USlnfl Unit 1 ilrumnina btntiuii > r> iinti>,.tDU tu SO/, visiny
values for e.pui tcit uaitu vol-i in uprj.itnd f Stiff Iti«lr< 11
Dasis for dutprmininq ui*£H|0 f.nt£,r t>r;cl
CLAYTON, F L Al.ihrtmn Power I I, OH' Oft /JJ Tpp
ig ui/nt 1 1 tti rpvi r
B007070009 Ntillf i
applirnnt plan
facility
KINTNIxIl.L 1 if
B0071COOin Notiriidtion of HOO/tiJ mpptinn u/util in llcth Boda, MD to
discuss util ruiponsf to Mfil HOOS^l reiinuBt For revieiu of
qualification itntumantation I ui s.if id ij-i t'lii tori t'lcitncal
Hquipmont to iilentl(i) torn nt main « tn HUKrO Or,n[i
KINTCT.l Licnnsing Uranili 2 BO/di/,1:! Ipp
i en 1 1 1|
B0070/03'?a For
i n t e g r 1 1 ij
CLAYTON, F L
dlrlt riniuestlit .tiK
Alah.irrui F'rlui't in
•>pp
QOO72B0587 Forwards IE Info Notice BO-SB. "Prompt Reporting of Info in
Accordance M/10CFR50 SS(e) " No written reaponst required
QRIEfl.D H Region 1. Phila.lol phia. Office of the Director
BO/06/13 lp
0007-nO'lO'i Nntiruation of Uuo;0'*ll
inapDit design itpccl' n* iiritnl
sei srnic qiiol i f 1 1 ,it uin rprni 1)4
K1NTNCR.L LiLi-ri'iino br.niri. • t''
5pp
in Piilth.in, AL to
9007020307 Forwards IE Circular BO-15, "Losa of Reactor Coolant Pump
Cooling & Natural Circulation Cooldouin " No written response
required
ORIER.D H Region 1. Philadelphia. Office of the Director
BD/O6/20 lp
BOD70B032t! rururtriK .iMuirmul nfn-i .'*• nut iiiuttduiu, "Lpiii nf Main
Feeiluiater, " umi-r gt-in ij operdt Ui|i l>r t>ct din ei , '"jl&tnn GunHr3t«r
Tube Rupturt (. 'Iiin'lpquatfi '"it 'ci.nrig IH.,B to rnrill
LOCA, " per NftL EIOOf,:'0 reqm- 1
CLAYTON, H L Al.jLiimti r-ouer i i< flO/l)Ci/3'l lp
BOO7li0701 Forwards IE Circular 80-14. "Radioactive Contamination of
Plant Peminerallied Water Sys !> Resultant Internal
Contamination of Personnel " No written response required
ORIER,D H Region 1. Plii Irfdel ph id. Office of the Director
80/06/24 lp
— 80070g()SI'B Abiiurni.il
3, Revision 0
* Alabama Poujer f
220
DOCKETED ITEMS
— BOO70B02 (6 Emfrgenry iipeiatmg pi or t Qurp. "StBam Gpjiarato)- Tube
Rupture." Vul •}, Rev I sjon 0
* Al»l>aia,* F guer Co fflVnS/ M <?pp
Od0^50 ErnprijcnLy upeiatinu prucndurp, " In.idequa t e Core Cooling Due
Small LtJ-CA ' *'ol 5, Re"iEioit 0
Alabam.i fr.ueT ( r, 01/06/13 4pp
8007100195 Sututiitb ineportsBE to IJHl QOOtli draft questions concerning
conta innpnt purge calves Comparison nf facility purge ays w/
Branch TtstJin i L al Position fill ti-1 one 1
CLAV7QN. F L Alabana Power Co 90/06/30 12pp
80072)0306 Notif 11 aticirt of U(m/<l't meeting u/utll in Bethesda.MD to
disc UBS r«diul Djjtciil feed •jpei'.
M1NTHER.L Lirnnsinfl Ilranih 2 01/OC./30 3pp
BQ0721O593 Wo 1 1 f i t at i on of OilO'l'i mpeting u/util in BetJiesda, rlD to
discuss respnri'.i- tc NRC po'itian un ijogi-.ided grid voltage
protection !' sy-i •'oltiiges
KINTNLR, L U I icpnsing Ur.inch 2 HO/O7/CU 3pp
Notifualmn of B00715 npftinfl u/uttl in Jtethesdai MD to
discuss tQTitTul rourn design
KINTNER, L 1 Licensing QTH»((J P BO/07/OJ 3pp
8007100177 To
map prcgra
CLAVTDN.F L
rtdrfl in^ rcquefiterl hy NHC Q00617 Itr re prBSerVlce
am^i Pouer Cn 9()/07'OJ 25pp
8007250135 Advises til at near-term OL applicants should perform
augmented luu power startup tests similar to those proposed
by TVA fpr Sequuydft, prior to Biceeding 3Y, of rated thermal
pouer
EISENHUT.D Q Division of Licensing BO/07/14 2pP
0007250320 Forwards info per NRC 800502 request re THI-2 action plan
Items IA21.IA23&IA31
CLAYTQN.F L Alabama Power Co 80/07/13 4pp
8007220436 Forwards addl info re containment sump performance In
response to NRC request
CLftYTDN.F L Alabama Pouar Co BO/07/16 4pp
B007aao95il Foruaids auiiliary FBI
requested in NRC S00408 Itr
CLnVTDNiF L Alabama Power Co
idwater endurance test data t telt info
80/07/U 20pp
800728035? Forwards requBat for addl Info re containment sump
pfirformancB under post-LOCA conilltinnfl nesponse to Itemi 1,3
ti 3 due bu GOOaOP Item 4 info should be provided by Mar
190!
TEDE9CO,!? L Assistant Director for Licensing 80/07/16 8pp
BuQ7a°0203 Forwards request for addl info re 800630 respon»e to TM1-2
action plan
TEDESCP.R L Assistant Director for Licensing 00/07/16 9pp
6007390410 ForiiiardB qualification repts (< seismic specs for five pieces
of equipment, per NRC requeet during 800707-10 plant site
visit for seismic qualification revieui
CLAYTON. F L Alabama Power Cn BO/07/17 tp
Responds to 800714 1 tv re augmented law power startup
program Submits schedule tt procedure for test performance
Util in process of writing detailed procBdurec t< reserves
option of combining tests No in own safety Issue involved
CLAVTOM.F U AlabHma Pouer Cn BO/07/17 Ip
B007E30403 Forwards addl info re degraded electrical power grid
conditions, in response to 800636 telcon Includes suppl
to utll 790115 Itr TO assessment of NftC Positions 1.2 6 3,
CLAYTONiF L Alabama Pouier Co BO/07/17 13pp
BOO71-1034y Foruarils de^ L r IP linn of pmpospd modified startup physics
test piogian Fifvi-ifd i>rQi|runi rp5oJ/i?5 NRC concerns re
sdutdown hank vri F 1 1 ii tion, T evi euj cnteilti ?. dctiane neodeiJ
should revii'U {riti-ru nut be met
Cl-AYTRM, F L Aldbamn Power Cu 80/07/07 l3pp
B00723Q4B9 RespondB to Action Plan Item III D 3 4 re control room
baft itabi I ity Room meats SRP specs ti guidance No moifs
required
CLAYTON. F L Alabama Power Co 90/07/17 Ip
0007160^79 Toiuaids rp'.nonfie to ( ontainnent Sijs UrniKh Question 57 For
facility Le^k ri'iJuctitin prngr,,m initiated to maintain
leakage fatci of -.I)!, nut Mite rpntriinuient ID as IDIO db
practical
CLAYTON. F L ill iilj.lmn f'oioer Til ilO/07/07 3pp
Forwaiils flmnnd 7-T tp FSflR Ftir Unit 1 I, (1L application Cor
Unit 2
CLftYTON, F L A]4Mm>] Power to UO/0//OB Ip
60072301)92 Forwards main control Toom design revioui commitmsnti per
MC main control room review team 300715 discussions u/util
CLAYTON, F L Alabama Power Co BO/07/17 <?pp
0007230346 Informi that util Will participate in EPHI/NSAC power Bdfetg
b relief valve performance verification test program
Licensee will submit evidence re oparabillty of installed
safety & relief valves Evidence eipected by 320101
CLAYTON, F L Alabama Pouer Co, 80/07/17 Ip
— B00710Q3&7 Application fni flnienO 73 to FSftll fur Unit 1 !i OL application
for Unit 2 C»r 1 1 f icotfl nf ',vc end
• fllabiJrtia Puwer Co riO/OT/Oa app
— B0071002?A rt-nenff 71 tt. FSAH fr,, Unit I !, OL application for Unit 3
ffevi "••<.» Unit A rijmpleliun of cnnst & iommcrcial operating
dates, updatirin '-pctiun in pmargpritij lighting sys !, info
p Brtnini riij lo EW prugr.im
• Alalidffld Plluer Co (30/pri7'O(J
B007P30'i53 Forwards radiological Tech Spec info concerning hydroaBn-
oiygBn-ni troflen mixture curves ft hydroscn recombincr
instrumentation callbr H/o encl
CUflVTON.F L Alabama Pnucr Co BO/07/17 Ip
B0073ao3o7 Requests that OL w/]lmited authorl lation for facility be
issued by H00901 per requirements in NRC 8006S& ) tr Request
Includes fuel loading, low pouar testing !* pauor operations
up to 5X thermal pouer Full power OL- requested by G01201
CLAYTDN.F L Alabama Power Co BO/07/17 Ip
B007EBOIPI 'iulimit'- facility status rept ao of B00704 Full power
licensing) •<=rhD>tul» a<\sa<n.f,i 1-month to meet scheduled H01101
start (if full i-iiBiui iirerjtinri Ajiplir.int atled to formally
rBqueit ruil lu.idnig * 1 nm j,nup>r letting license
KlHTNFff. L LKPnsinsj Cranth J 9O/H//11 Spp
inis nrDieBa Luntrnl (n ngrdm for r.iduMste solidification
Br.p,, it 30O701' inCPting ui/NF7C
Al ih.ims Fnu.pr C |. fit) 07/14 Ip
l1! Ftnifint i m (ontifl *, frottc t inn Prorcdurp FWP-Q-RCI>-474.
iin 1. "tlolu lt> "ml id. [ 11 dtinn Unit Operation "
HEr< K W nlaUiiinn Puwr i'n 80/ul/lO H9pp
OOJSSQ'i'iQ rnruJMls Ron i, on I -MT.IJB |10UB= t.i nl,inl offsitfl doDB
taller miiniMi Irit oi pjt u IPF rad j.itic,n monitor iclpoint
cajLulfltiun metni.irfi.iiiqij rt».ru".ej durina SH0709 rneotlnn
u/NRC u
CLAYTON, F L Aldt"amJ Pnui" to HO/n7/H ftpp
0007230S9S Fnruards info re sya description nf core thermocouples In
response lo TMI-2 jctiqn plan Hem 1 J F 2 on inadequate
core tooling instrumentation
CLAYTON, r L Alabama Pouer Co 80/07/17 Spp
3007340071 Notifies that util in process oF finalizing plans For
instrumentation sys to relate reactor vessel water level to
inadequate cure u on ling Provides list of commitments
concerning instrumentation ays
CLAVTON.F L Alabama Power Co flO/07/17 Ip
BOOV280337 Commits to guidance in Reg Guide 0 9 re ostabli shment of
bicassay program. w/Bicapti on of interpretation of
measurement results Problems of interpretation are stated in
1CRP Publication 13, Paragraph 112
CLAYTON. F L Alabama Pouisr CD BO/07/IB ip
DOCKETED ITEMS
221
BOQ72B049O Suppls !. supersedes util BQ0717 i espouse to TMI-S action
pltn it tin* Util will participate in EPRI PUR sarety !. relief
evidence of valve operahility by BD0701
CLAYTON, F L Alabama Power Co BO/O7/2J Ip
BQQ7B90&37 Forwards requested info concerning TM1-2 action plan for
facility Includes description of interim procedures It
nit hods tar qualifying high level aicidential rad inactivity
(••leases tor noble gas, participates t< ran i oac t i vo effluents
CLAYTON, F L Alabama Power Co BO/07/31 5pp
B0072702>42 Forwards requested info re tore subcooling instrumentation
Includes description of incore thprmucouple measurement
• tutu available at facility
CLAYTON, F L Alabama Power Co BO/Q7/21 7pp
6007070394 Forwards IE Insp Rej,l« FO-348/BO-10 !. M- 364/30-11 on
BOO331-0425 No noncomp 1 idnte noted
LEWIS. H C Region 2. Atlanta. Pprictnr Gprrationb Mut lenr Support
Drench BO/ 06/31 2pp
— B007Q70399 IE Insp Flepts 50-J1H/(H»-H> (< 50-364/fiO-ll on B00331-0435
No noncompl irincf noted Mrijoi HI pat iiispecteil hot fumtional
testing. IE bulletin fnllouiup i: plant security
MARTIN. R D Reyion 3. Atlanta, Rcactur Operations Nuclear Support
Branch BRADFORD, HH Megiun 3, Atlanta: Qffne of the Director
6pp
E NRC Bafety Evaluation Report IBEH>. sup pis I, correspondence
0007270535 Fnruiard* SER input re Thtl Action Plan TasV i A 3, addressing
revised scope & criteria for licensing e tarns
MOORE. V A Division of Human Factors Safety BO/07/ IB 2pp
0 Aijud icatory correspondence
BDO7310343 Forwards Commission BO 0527 memorandum fc order cnntaining
decisions on UCS 780503 petition for reconsideration of
730413 memorandum & order UCS 771104 petition sought action
re fire protection for electrical cables
EISENHUT. D O Division of Licensing BQ/Ob/35 89pp
J Insurance !> Indemnity information
B0070BOa61 Forwards MAELU EICBBS Binder XD-7J
FIELDER, J Marsh t< McLennan, Int , M !, M Nuclear Consultants, Inc
Div BO/O6/30 &pp
Q Inapnclion reports, IE Dulletins E, correspondence
BOO7160791 ForLiaids IE Circular flu-14, "iiad mac t IVP 1 on liiminat i an of
Plant DemineraliiDd Water ^ijs *- PuEHltant Interinil
Cnntamination uf Personnel " No lurittoii response required
0'RE11LV,J P Kegion 2, AtUnta, Oftici- nf thp Director
B007230206 Forwards IE Bulletin [10-16, "Potuntidl Misapplication of
Rosemount Inc (IndelB lltl «< lisa Prtssure Transnii tlern
W/Either A or D Output Cudfct " Untti-n response refill red
IE Circular 00-16 ulsu cncl do uj'itten re>-pQTi^B required
O'REILLY. J P ReflKm 2, Atldiila. Gffue of tlic Dnettur BO/Oi/
IP
B007210365 Foruarils response to IL RulUtin BO-Oa, "F i.inunat ion of
Containment Liner Penetration Holds " All containnifftt butt
uields between penrlration sleevc<. I, prnctss |iiping in Unit 1
radiographed Unit 2 in be rad IODI -iphcfl upon r(jjn|,l 6t j un
CLAYTON, F L Alahama Pouier Cn BO/07/01 'ipp
B007230510 Responds to Tb nulletin 79-^7, "Loss of Mon-Class IE
Inatrumentation t Control Pnuicr Sg« [tu^ During Dpnrfltiun "
Prior to initijl fuel loadinq. [iroi udurps tn he riwiT.eri to
reflei-t annunciation d aulpnutic mntrcl furctinns
CLAYTON, F L Alabama Punier To QQ/07/17 Ip
G00724D1DB Foruiards IE Info Notice BQ-20. "Loss of Decag Heat Removal
Cftpabllitij at Davis-Besso Unit 1 While in Refueling Mode "
No response required
D'REILLV. J P fieflion 3, Atlanta, Office of the Director BO/05/OB
2pp
B007310150 Submits flddl response tn IF liulli'tln 71-27 re loaa of
nonclass IE instrumentation !> [Ontrol poiupr sij s bus iluring
operation Proiedurea uill bt1 ri'vittd to ttfltit affected
annunciation E< autuin.itic contrnl functions
CLAYTDN.F L Alabam.i PDuier To 00/07/17 lp
Q007O20160 For war (Is IE Info Notice 80-23, "Qrealidouins In Contamination
Control Programs " No written response required
O'REILLY, J P Region 2, Atlanta. Office of the Director BQ/OS/BB
BOO7310330 Forwards "Inservici' Insp pi nqmrn for Class 1 , 2 fc 3
Cnrnponents "
CLAYTON.F L Alabama Pouer (u B0/0//?'j 3pp
8007210-119 Forwards IE Cifcular SO-13, "Orid Strap Damage In
W&st ing house Fuel AsaembliBE " No written response required
O'BEILLY, J P Region 3. Atlanta. Office of the Director BO/03/2B
— B0073I03/4 "Inseivice Insp Pi o«ram for Tl.iss 1,2 S. 3 Components
» Alabama Pouier Co 80/07/P9 7Bpp
Reportable nccun iinrps, LERs f- relrttcd COT respondent o
BOO70lOaS3 Foriuards IE Info Notice 30-23. "Loss of Suction to Emergency
F«edua'ter Pumps " No written response required
, J P Region 5. Atlanta, Office nf the Director 00/03/2?
BOO732Q04O Forwards IE Info Notice BO-Hi, "Evaluation of Contractor
QA Programs " No written response required
O'REILLY, J P Region H. Atlanta. Office of the Director BO/04/10
Bpp
BO071AOaiB Foruarda IE Info Notice BO-37, "Dpnradat ion of Reactor
Coolant Pump Studs " No specific action or response
required
O'HEILLV.J P Senion 2. Atlanta, Office of the Director BO/06/11
8007230330 Forwards IE Infu Notice 80-23, "Prompt Reporting of Info in
Accordance H/IOCFR5Q 55(o) " No written response required
O'REILLV.J P Region H. Atlanta, Office of the Director BO/06/13
2pp
6007020333 Forwards IE Circular BO-I5. "Loss or Reactor Coolant Pump
Cooling & Natural Circulation Cooldoun " No written response
required
P'REILUV. J P Region S, Atlanta, Offirn of the Director 00/06/20
0007390395 Forwards IE Inap Rept 90-361/80-05 on BQQ604-06 No
nontompl i ance noted
KENNA.W I) Region 3, Atlanta, Safeguards Dronth eO/06/SO
2pp
8007160B61 Part 21 rept rp We-.tiiinlinu'ie ruvicuj ri f tofuLi; Injection
termination criteria following Pucnndsnj aidt! high energy
line rupture w/potpntial for ilnirmge to contr i f ugii] charging
pumps Concerns arc applic^hlf to facility
HAIRSTON.M 0 Alabama Pnupir ra QO'06/li ?pp
V Operator Eiaminotions
B007E70525 Fniwards "SEFi input r> TMI Action I'Jdn Tail, 1 A 3, adilfBIBing
revised scope !, criteria fui licunning ei.ims
MOORErV A DiviBion of Human Tartui", S-<ifet|j 00/0//1EJ Spp
DOCKET 50-366 CDUIN I HATCH ftUtl feAtf F'l M\l. UNIT ,>
F (Security, mediinl. emergeni-ij ', fin1 (trainer ion (i
S0070SOflBS rnruards i eqiiest f-iir oilu) infn le (KMlSr'R revived guard
traininij !< qu<il i Pi caticn plni, rin 1 withheld
(ref lOCFR^ 7VQ)
REID.R W Operating neartor*. ni-anth ) FlO/O^'l1; 2pp
800733010'! Requests parti i. ipnt i un in ttuUy of ppop 1 e-i-elflted piotiloms
in nuclear sal'equflrita Qtudii luvtlvei collnctiun nf data [in
licenice icturil-y forces '. pr,n.tiqp5 NH( ulshi-a tu intervioiu
BBcuritg mgt personnel at f.icilitie^
EISENHUT, D 0 Division of Licensing f 0/07/ II ?p n
B0072Q0514 Advisrii that BOO/1H imerijt-nctt plan Hugruding per NUREQ-0£5fl
will oe dolBueil until 801'JOl Kt-'nux'ti rnpt fusm H004Sa-21
Emergency Preparedness Tedm tnvieu
HIDNER.W A Ooorgia I'ower (o BO/07/21 If
222
DOCKETED ITEMS
B0073I0343 Foriuardt Com-niss ion 80052? menorandum t, order containing
decisions on l>\ S '00502 petition for reconbi deration of
79041J numoraridijm •< order UCL 77110) petition sought action
Tt fire protection For electrical cables
EISENHUI.D S Division of Licensing BO/06/25 B9pp
P Operating license stage documents (< correspondence
6007230033 Summary cf B00207 neeting w/Mark I owners group in Betbesda,
MO. Tt revisions to NRC acceptance criteria fe outstanding
issues relative to Mart I containment long-term program
GRIMES C r Plant Systems Branch 80/03/21 31pp
SO07I40S.4I Atfvisci that date? of responses to 79G93/ generic 1 tr were
791035 for Peach Bottom 2 f- 3 f< 791119 for Hatch I *, 2 fiept
on val/e operability program required only For plants
desiring to justify unlimited purging
VEBHELLI.D M Operating Reactors Branch 4 60/06/05 lp
00O701O474 Advise* that util will comply u/SOOSO? 1 tr Issuing five addl
THI-3 related requirements for operating reactors When
implementation criteria is developed, NRC uiiJ] be notified of
any variation fran schedule Reserves three options
HIDNER.H A Georgia Power To BO/06/20 lp
6007020623 Advises that review Fias been completed on B00513 rept of
calibr results on seismic instrumentation TriaMal
Time-History Act cl erograpfi, CLLi|-ND21 mas returned to vendor
For repair as recommended
HANRY M Georgia Power Co BO/06/25 lp
B0070903B9 NntifHation of 300703 meeting u/util in Bethusda, MD to
discuss util basit For delayed schedule For installing
T-quen cfiers
VERHELLl.D Operating Reactors Branth 4 60/06/36 2pp
BOO 700 02 a 7 Di-cussei app 1 if ab 1 1 1 t U of GE response to questions raised
ou C Michelson. ,n response to NHC 800SO7 request Automatic
isolation may I.CCUT for breaks outside or inside
containment depending on (treat sue b location
HIDNER.W A Georgia Power Co BO/06/30 2pp
BOO71801I5 Forwards Amend 16 to License NPF-5. safety evaluation &
notice af issuance !< availability
REID. R H Operating Reactors Drancft 4 SO/07/03 Spp
— •800719013'! A«end ID <-o License WPF-O'J. temporan ]y revising Tech Specs
for HPCI sys tP permit startups u/inoperable HPCI, to Conduct
special tett
REID, K H Operating Reactors Branch 4 BO/07/Oa Bop
— -B0071H0135 Sjfety vv»luatian supporting Amend 16 to License NPF-5
* Operating Heactfrs Orantli 4 80/07/02 2pp
— B007IB013B \nt)ce of issuance !, availability of Amend 14 to License
NPF-5
P.EIO.R W DperatlnB Reactors Branih 4 80/07/02 3pp.
80071B0484 Tonfirms util commitments at H00703 meeting ra schedule for
completing muds Fnr resolution oP Mark I containment InnB-
term program Meeting summary cncl
BEIB.R M (Iperating aeactors Branch 1 BO/07/D7 Spp
— 80071B04B7 Sumnarg af B00703 meeting Lf/utll re licensee schedule for
completing mods for resolution af Mark I containment long-
term program
VERBELL!,D M Operating Reactors Branch 4 BO/07/07 &pa
80072304,56 Provides info re neui Dfc ti ties, positions 6 assignments of
personnel resulting Fron QOO42B reorgani istion of Ofc of
Nuclear Reactor Regulation
NOVAK, T H Assistant Director for Operating Reactors BO/07/1O
B0072Q0634 Applnation to amend I icpnses OPR-57 « NPF-5. changing Tach
Specs re tor,is water tenp IF water temp cannot be restored
within 24-h, reactor shall shutdown using normal shutdown
procedures
HIDNER.W A Georgia Pouier Co RO/O7/17 3pp
--fl0072BOb42 Proposed lech i.pecs Set tions 1 0 t, 3 7 re torus uater temp
IF water tenui cannot be restored within P4-h. reactor shall
(hutdoun untnj normal shutdouin procedures
» Georgia Pnun- Co HO'O7/17 9pp
8007310336 Requests written confirmation of 000718 telcon r* critics!
situation concerning electrical power genoratlon in refllon
HDVAH. T M Assistant Director for Operating. R"actor» 00/07/88
Spp
Q Inspection reports, IE BulletinB t correipond»nc#
BOt)7a*Q213 Favuavds IE Info Mattel S0-H0t "Loss of Decay Hast fttnaval
Capability at Davis-Hesse Unit 1 While in RdfuBlinB Undo '
No response required „„,„. i™
O'REILLV.JP Region 2, Atlanta. Office of the Director 00/OS/Ofl
3pp
8007140490 Forward* IE Bulletin D0-13i "Cracfcing in Cor« aprny
Spargers " Written response required
O'REILLV.J P Region 3. Atlanta. Office of th« Director SO/03/18
BOO70aoi7B ForwardB IE Info Notice BO-S2, "Brealidounfl In Contonlnatlon
Control Programs " No written response required
O'REILLY.J P Region Si Atlontfli Office of the Director BO /OS/ SB,
lp
H007O10320 Forwards IE Info Notice H0-23i "Lo»* of Suction to EMtronncg
Feoduater Pumps " No uritton rotponse required
O'HEILLY.J P Region S, Atlanta, Office of tho Diroctor 80/03/39
lp
B007J00064 ForuiardK IE Insp Repts SO-3Z1/BO-2E d 80-366/00-32 on
B00412-03ia No noncampliance noted
LEU1E.R c Region S, Atlanta, Reactor Operation* NucUflr Support
Branch 80/O5/29 Spp
--Q007100066 IE Insp Repts 90-331/00-22 t, 30-366/00-23 on BOOtlS-DSia Ho
noncomp 1 iance noted Hajar areas inspected Tach Spec
compliance, RQs, housekeepinfli plant operations. (JA practical b
IE Bulletin 79-2i
DANCE. H C Region 2. Atlanta, Reactor Operation* Nuclear Support
Branch OOQEflS, R F Region 3. Atlante. Office of the Director
BO/09/30 3pp
B007320O73 Forwards IE Info Notice 00-2^. "Evaluation of Contractor
Oft Programs " No written renponse required
D'REILLV.J P Region 2, Atlanta, Office of the Pirettui- DO/06/10
Spp
B007Uoa94 Forwards IE Bulletin BO-14, "DHorad4tlon of BWH Bcram
Discharge Vol Capability " Written response req.u(red
0'HEILLV.J P Region 2. Atlanta, Office Of the Director BO/04/ IB
lp
BD070a073fi Forwards IE Bulletin flO-13, "PoBSiblt Loss Pf Enmraoncu.
Notification 8ya (ENS) W/LOEB of Offaite Pouor " Written
response required
O'REILLY.J P Region 2. Atlanta. Office of the Director BO/06/1S
lp
BOD703029Q Foriuarjs notices of violation fc prono«ed imposttion of civil
penalty re IE insp on B00319
STELLO.V Office of Inspection tt Enforcement, Offict of tho
Director 80/06/1? 2pp
—8007020301 Notice of violation from insp on 900319 Noncompl i*nce not«d
paetages of licensed nmtls shipped on B00310 w/radiation
levels in truck tab exceeding regulatory Unit
* Office of Inspection Sc Enforcement, Offio of tho Director
BO/ 06/1 9 Ip
— -B00702O309 Notice uf proposed imposition of clivil penalty in amount of
*4,OOO re violation noted during 800319 insp
» DFfice oF- Inspeelion d Enforcomenti Office of the Director
80/06/19 lp
8007090074 Requests extension to B0071B to complete reiponiv to lt»«>
t I. 2 of IE Bulletin (30-10, "Contamination af Nonrariloac tl vt
BIJS ft Resulting Potential for Unmoni toredi Uncontrolled
ReleaBB of Radioactl vi ty to Environ "
HJDNER.W A Oeorgln Power Co BO/06/19 lp
B007140180 Discusses B00319 Incident which revealed radiation l»v»l»
exceeding limits on trucfc cab arriving At Barnwel] Bit*
Forwards notice of violation (. notice of propoted impoiltion
of civil penalty
8TELLO.V Office of Inspection !i Enforcement, Office of th»
2pp
DOCKETED ITEMS
223
B007020430 Forwards IE Circular 80-19, "Loss of Reactor Coolant Pump
Cooling b Natural Circulation CooSdoun " No written response
O'REILLY, J P Region 2, Atlanta, Office nf the Director B»/Oi/20
00072402512 Ack rureipt of BOOdll1 llr i nFurmi r.g NFir of -steps taken to
correct violations nnted in IE Insp Kepts SO-321 /GO- 17 i<
5O-3bt>/8a~l7
O'REILLY. J P Begum 5 Atlanta, tlffvi-p o.f th< Uji-ector BO/O7/11
IP
B007UO250 Ack receipt of 000604 Itr informing NBC of steps taken to
correct violation noted in IE Insp Jlepta 50-321/BO-I9 S
BTOHfl, J P Region a, Atlanta. Fuel Facility & Materials Safety
Branch aO/Oi/23 |p
— 8007340.2n4 Responds to NRC H00519 Itr re /i oliitiona noted in IE Insp
Repts aa-321/BO-|7 ft 5O-3t,(,/aO-17 Corrective action* neu
airlock scheme installed Action"-. Tf event *. dp/iation
repor lability justified
UIDNER.UA Georgia Power fn BO/Ofi/1.2 JIpp
-8007110559 Responds to NRC H005IS Itr re violation nat«d in IE Insp
Repts 50-321/00-19 b 30-366/80-19 Corrective actions Full
airiltt of ftnargency plan & imp lementino procudures completed
IJIDMEFI.U A Georgia Power Co BO/OA/Q4 Ip
-0007540377 Forwards IE Ititp Hepts 50-3.31/80-17 t, 5£l-3fe(b/eO-l 7 on
00030Q-O411 I- notice of violation
LEWIS, R C Region 2, Atlanta, RE.K tor Plperd t IODE Nuclear Support
Branch BO/O'j/l'S 2pp
— 0007110363 Forward* IE Insp Repta 50-321/BO-19 t< 50-366/80-19 on
BQ0421-23 b notice 0P violation
BTOHR. J p Region 2, Atlanta. Fuel Facility (, Materials Safety
Branch BO/O3/IS 2pp
— 9Q07110S6Q Notice of violation From insp on 800431-39
» Region 2, Atlanta. Office oF the Director BO/03/12 lp
—0007110376 IE Imp Repts 50-321/00-19 * 30-3&fe/SO-l 9 on 000431-23
Noncawp Hanco noted Failure to audit emergency implementing
praCRtfure* sverg S gr» under cogniiance oF saFety review
PERROTfTI.D J . TRDJANOUSHI.R Resjion S, Atlanta, DfFico of the
Director JENKINS, 0 R Region P. Atlanta, Fuel Facility EC
tutorial. Safety Branch BO/05/1S 9pp
B0073O0376 Foruards IE Inap RepH 3o-32iy(JO-14 fc 30-366/BO-14 on
900319^0429 Ic 30 Enforcement actiun disrusfied in NRC B006I9
Itr.
O'REILLY, J P Region 2, Atlanta, OFFice of the Director 80/06/33
2pp.
-- BOO73OO5PO IE Insp Repts 50-321/80-14 t 90-366/BO-14 on BOD319.0429 &
3O NoncompliancB noted radiation levels on vehicle cab in
*]£•(« of rejjulatory limits
BTOHR. J P , WOODRUFF.R L Reflion 2. Atlanta, Fuel Futility *.
Mjt»rlol» Safety Branch LACEY, L R Region 2. Atlanta. Office of
thn Director, BO/06/ 19 Bpp
-BO07240Sa9 Notire cf violal-mn from insp
» Region ?, Atlanta, Office of the Bi roe tor
80/05/19 2pp
— BOQ7S40392 IE Insp Hepls 50-D31/BO-17 Si 3O-366/HO-17 on BOO3OQ-04U
Noncompliance noted failure to maintdin aeioncffiry
cnntainment door integrity !c to meet NftC reporting
requirements
RDCER3,H r Rrgion 2. Atlanta. Office uf the Director DrtWCE, H C
Region 2, Atlanta, Reactor Operations Nuclear Support Branch
BO/O5/19 5pp
00O7230393 Responds to IE Dulletin 8O-17. "Fnilure of Control Rods to
Fully Insert " Scram discharge vol ( SDV I vpnt t, drsin
operabiliti) venFitation t&st peiformcil All drain ti vent
vslves veriFied operable Nn r&!,idiial urt t er Fnund in SDV
MIONER.H ft (.enrgia Power Co BO/O7/11 lp
8007310275 Responds to NRC BOO (.19 nciti.ce of violation ro oiceamve
radiation oxposiir-B rate inside cat at radmaste transport
vehicle Radiation survey indicated radiation levels uithtn
code requirements Requestc mitigation of vioiatinn severity
MIDNER H A Beorgia Pcuer CD BO/O7/I4 2p p
~B007310aa7 fip&poniiG to NRC B00o19 notiti; of proposed Imposition Qf
civil penalty ftsdlstion ^urvtiy of vehicle indicated levalt
within code requirements Requests mitigation of 9pveriti| of
violation b reduction of civil pe-naJ ty
WIDNER.U fl Otnraia Puiucr Co 80/O7/lfl Hpp
B00717O11B Forwards IE Circular BO-14, "RadioactiVH Contamination of
Hlant r>B«ln*raliied Mater Bys tt Resultant Internal
Contamination of Personnel " No uiritten response required
O'REILLY. J-P Region 3, Atlanta, Office oF the Director BO/06/24
Iff-
8007380538 Advises oF proposed Lcmpiinsfitoi y measures re 3-uili
eitension for srrani testing required for IE Gullptin 00-17
Util mill perPurm tests as Boon .11 ptinsibSr should critical
load situation ease
WIDNER.H A Oem-Hia Power Co 8Q/O7/19 1[>
a007aa024I? Foruards IE Bulletin BO-16, "Potential Misapplication of
ROflvmounfc Inc Models 1191 b 1 1 33 Pressure Transmitters
M/Either A or D Output Codes " Written response required
IE Circwlar BO-16 also end No written response required
O'KCILLYi J P Reoion 2. Atlanta. Office oF the Director BO/06/27
lp.
BOO723O281 Butmits final reapanse tn IE Bulletin 79-1B Noise
•valuation* performed par inaccessible areas following
Initallation of evacuation algnals Visual warning liohts
will be Installed during Fall 19BQ refuel ing outaai
A Oeargia Power Co So/06/30 lp
0007090337 Forwards info in response to Items l,2(a) & 3 required bij IE
Bullvtln BO-ll. "Masonrii Wall Design " Item 2(b) to bo
addrsistd ID final rapt
HIDNERiU, f> Oeorgia Pouier Co BO/07/03 ISpp
Q0072B0541 Advispt uf cmmplctiun of Items 1 I, H of IE Dulletin BO- 10,
"Contamination of Nonrairioac ti vo Sijs " Complete
documentation at afFected tys f. a-.socia:ted nonttoring
proceduios available for rcvipu during Future ontiltE intps
UJDNEFi, W A QeorQia Power Co S(l/O7/]B lp
Q0072906IB Requests delay iti perfurming scram teata required by IE
Bulletin BO-17 due to high temps in region Rpiimvino larje
units FFOID svc uould place severe strain on electric
generating capac i ty of region
HIDNER.W A Georgia Power Lo 30/07/m 3pp
R Periodic operating repai
B0072aOA7Q Forwards monthly operat-ng i-fpts fnr Juno I9BO
MANHY.r) Georgia FDiuar Co QO/07/ 10 lp
9007140384 Responds to IE Bulletin BO-OB re containment liner
(ittle-tra tioTi ueld eiam Riquests 30-daij extension for info
iubnitt*l due to large number of flued head containment
liner ptnetrat ions * hv*vi| high priority uork load
HICMER.U A Oeoi-gla Poiu«r Co Bo/07/07 lp
B007S0012t Ack receipt of 8O0623 Itr inForming NRC of steps talen to
correct deviations notad in IE Insp Repts 5Q-321/BQ-03 b
HURPHYi c, E Region B, Atlanta. R-nBctor Construction & Engineerlna
Support Branch BO/07/07 lp
— BOO72B01EB RBftponds to NHC 800203 J, 0411 ltr« re deviations noted in
1C In»p Repts 50-3B1/BO-02 d 30-366/00-03 Corrective
• c tioTi». *ubmitt«it encl draft engineBrinfl revieui of OA Fire
protection program at NRC BO 0602 meeting
NIDNER.U A Georgia Pouer Co SO/Oi/23 42pp,
— 8007290696 Foriuardh mnnthlg opwrijfcinq repts. For June 19QO
MftNR/.M Georgia POUIET (o 80XO7/1.0 lp
— B007BB069E Month ly operating rpp-t^ fnr June I^BO
DLACUVtELL, n H Oefjrgja Power Co BO/07/10 7pp
B Reportable DCT u-rreniBs, LfeRs I related COT resjiondenc e
B007010491 Forwards LER B
MANRY. M Georgia Power Co HO/Oft/JM lp
— B007010503 LER aO-OS9/03L -n on B0053Q. uih i 1 e per forming HNP-H-331 3. taruf
suction valvpt DE41-F041 S. 2E41-RWS fafUd when nlvan open
signal Torus valves, shin tt-d out due I a L ondBnoat ion in HPCI
mom Cause uf condense* i on WFIS >,ti'nm Iea1(ao« around seal
NIXiR T Georgia p-ouicr Co
SO-07O1O310 roruarris revised I LH UO-Oi,a/O:iX-l
MANRY.M Georaia Power Co (30/06/34 la
224
DOCKETED ITEMS
— BO0701U51B
LER QO-OftS'iOK-l nn SOOi;
nain ujilhin Tei d <5pec fat
Pouicr '"" SO/oii/24
.uihile performing primary
ad by Efltpoint
~ BQQ71506B5 LER BO-095/O3L-0 on 1300617, dur Ing HNP-2-3123. I OOP control
sys blowc-r oporab 1 1 1 tiji inboard leadkage control sys flow
indicator A pegged upscale t< would not return to IBTO Ou*"d
by bent flow element float Float straightened It cleaned
NIX,R T Georgia Pouier Co 80/07/07 2pp
BQO7O30272 Forwards kER BQ-OfU/O.iL-0
MAMHV.M Seoiyin Pouer i"o 00/10/24 Ij)
80071704O5 Forwards LER BO-IOO/OJT-0
MANRY.M Georgia Power Co 8Q/07/OB Ip
--BQ07030c!'4 LER aoil<9Q/O3L-ii on S00601. uih i IE starting up Unit 2 reactor,
HPCI auto i = nlat!br. logic f ur ttioimel D dltf not reset until
reactor pressure ina -. fi'j n 5 i g ( a u s e d by calibr procedure
u/Dverly cnn sprvdt i ^e stlpcmt SetpoinL changed
N]X,[J 1 Cedroiri Power rn £50/06/24 3pp
— 800717O41O LER BO-10O/O1T-O an 8Q07O2, during performance of Nigh
dryuiell pressure survei 1 lance proc eduresi found switches let
above Tech Spec limit Apparently caused by aetpoint drift
Bui itches recal i br
NIXiR T Georgia Power Co BO/O7/OS Spp
8007030230 Forwards LFR SO-Q'^/CKJL-O
MANRV.M leargii Pnuer '-o f)0'O6';'4 Ip
3007170153 Forwards LER BO-Q96/03L-0
(1ANHY.M Georgia Power Co 00/07/09
— BOO703O293 LER BO-(W2/tnL-O c
9teadij~st-ite poujcr opcratur
bypassed uh i J e telectmo re
Power supply repaired *k let
N1X.R T (fpnrgi.j Power Cn
HOOM I ijunng lurvei 1 lanca checks
found H rod Block monitor
E Caimpd by coitiponent Failure
rnpd to svc
SO/Ofi/24 ^pp
— B00717046B LER BO-096/03L-0 on 900637, uj/roac tor mods switch in run,
reactor bldg to toi'us vacuum breaker iaolatian valv«i
2T48-F31 1. Fai led open Caused by failure of delta prnseur*
switch, 3T4B-N311, reactor bldg to delta pressure switch
NIX.R T Oeorgia Poiunr Co BO/07/O7 Spp
BO07030261 FID on BU052J, 1 icpnsee reviewed Hinometrics, Inc BOO913 calibr
rcp-t IB seisniit ins trumenta tinn Triaiiiil Time-History
Accelerograph 2LDI-N031 calibr indicates eicesaive change
HrtMRV, M Geotgis Power Co 30/06/Z-j Ip
S007O20SaO Forwaids BDOi27 WDES refit made to State of GA re discharge
op free available chluridt in coulinu tower blowdnun
MANflY.M Georgia Puwor Co RI/06/Pt. Ip
8007310393 Forwards LCD BO-Q93/03L-0
MANRV.M Georgla Power Co 80/07/11 Ip
—8007310397 LER BO-093/03L-0 on H00613. dur ing steatty state pautr,
HNP-a-lOSO rounds procedure readings 9 homed drywcll avar*pa
temp high Caused bij high ambient temp & Inadequate cooling.
Chilled uater Plow incrcnBod
CQBSIN.C L OEorgia Powor Co BO/O7/11 3pp
— 80O7020333 NPIiES tinncompl lane * notification on B00619,at full pouier
operation, c in n-ldting uater ih lonnat ion sequence was
autnmaticallij a 1 1 1 va tpd, i tsul t iiig in release of free
available cMnnne in conling water bl oudown
DVERLEV,T E fleurgia Pouet Co BO/O6/27 2pp
B0073103B4 (10 on B00711.Unit 1 LPC1 inverter tripped t. Unit 2 4-l(v but
2F supply breaker !i HPCI tripped Supply breaker trip cauiid
by jumper missing from neutral leg Motor valve on HPCI
replaced making it operable Events submitted per Itl) BO- 1 7
MANriY.M Oeoroia Power Co 80/07/14 2pp
60O7O30277 Foruards LER aO-09q/(UL-0
MANF1Y, H Georgia Power Co EjO/06/36 Ip
S0072B0503
HANRV.M
oruardB I.EF) BO-09H/03L-0
Oeorgla Power Co 80/07/14 Ip
--80O7030t>77 LEH HO-09'5/03L -G on 000613, uh i Ip performing routine
•.urvei 1 lanes nn t or us-dr yiuel 1 vacuum breaker valve, valve
2T4S-J3J1! failed to oppn Cause unknown Vacuum breaker valve
will be repaired during neit reactor told shutdown
H1X.R T Geurgia Power Co 80'0h/3i, 3pp
— BQQ72B0513 LER HO-09Q/03L-0 on 9004,26, w/reactor al 99X atuadlj
power, HPCI pump failed operability Caused by HPCI pump
auction preunuro tronamittor 3E41-N019 drifting out of
tolerance causing 2E41-R60& to indicate incorruc t l(j
NIX.fl T Oeorgia Power Co BO/07/14 2pp
BOO711Q42? ForoiarUs LSR BO-O^l /(UL-0
MANRV.M Georgia Power CD !!0/0(>/?0 Ip
B007240134 Forwards I.ER BO-077/03L-0
Ooorgl.i Power Co BO/07/13
— BOO71I0437 LER BO-071/03L-0 on B0(lfa05, wh i le pulling rods to increase
power, level run- nai fiaction of limiting pnuer density
Found higher than Tech SIIPC .illowod TausEd by combination
of low fepduater i, low ICHDII NRC reviewed problem ,
CDBGINiC L rteorqta POWPT in QO/O6/30 2pp
— B0072-»0ian l-CR 80-097/03L-0 on SOQ6H5, luhi le perfDrmino *Upv«illancB
procedure HNP-S-3307! HPCI steam lino flow FT6C, Plouiaultch
2E41-N001 setpointa eiccedod Tech Spec limit* Canned by
netpoint drift Switch was retallbr !c returned to avc
NIX.fl T Georgta Power Co HO/07/13 Spp
BOO71103ii6 PP -50 J46/1980~100 on 30070?, wh I le performing surveillance
procedures HNP-^-'JjOr? ft HNP-2-J172M, high drywall pressure
switehps 2C71-NOOS/1 through D !, 2E11-NOHA through D found
out of tnleranif Caused by setpoinl drift Switches recalibr
HANHY, M Oeorgm Power Co BO/07/02 2pn
BO07150635 ForwHids updated LER UO~Oi4/0-1X-l
WfiNRY.M Georgia I'ouer Co 30/07/03 IP
BC071504>42 Updated LER SO-fift4/03X-l on B00419, w/unit in cold shutdown,
tuhile performing (15IV leakano control syu L5FT, bleed valve
2E33-FOB1B inducting lights went out Caused by defective
torque switch Tyirqup tiuitch inas rpplaeed
CDG&IN, (, L Genrgia Power Co BO/O7/03 2pp
BOO72B04^0 Forum-it's updated LPH QO-045/01X-2
GPOrgi,, Pnuer "u HO/07/03 ]p
— B0072H(W5-i Updated LCfi 80-U45/01X-3 on 800404, I eakafle rates found
unacceptable Jurjuj lean ratt tust Caused by heat damage
From 1111 fallat i tin melding Val/eii will be replaced
L G&nrgiri Pouiet To BO/O7/d3 2pp
BQQ715Q&7B Forwards LEfi BO-091/03L-O
MflNRY.M Georgia Power Co 00/07/07
8007340163 Forwards LER BO-10:t/01T-Q
MANRV.M Qeorgta Power Co BO/O7/17 Ip,
—8007240167 LER BO-103/O1T-0 on H00709, determined 2E11 ND10A through D
high dryiuall preHBUro switcheH outside Tech Spec limit
Caused by setpoint drift Switches rocalihr
NIX.R T Georgia Power CD BO/07/17 Spp
B00725Q411 Forwards LER BO-O99/03L-0
MANRY.M Georgia Power Co 80/07/17
IP
— BQ07290412 LER BO-097/03L-0 on BOOiH6, during instrument check, found
0 drijwel] analyier giving false dioxygen rending Caused by
personnel error Regulators marked for double cheek of
reagent gas flow wliile chnnqing reagent gas bottles
M1X.R T Oeorgia Power Co 80/07/17 2pp
B007SBO51B Forwards rev* Bed LCR BO-09A/03L-1
MrtNRY.M Georgia Powor Co CIO/07/17 Ip
— B0072B03SA Revised LER BO-09<b/O3L-l on 800&19. u/reac tor rnodt switch in
run. reactor bldg to torus vacuum Breaker Isolation valvni
ST4B-F3H. failed Caused by failure of delta pressure suillch
2T4B-N311 Micro switch replaced
HIXtB T Oeoroia Power Co BO/07/17 Spp
DOCKETED ITEMS
225
DOCKET 3O-367 BAILLV QENERATINQ STATION
A rti»p .1 i catlon/constructi on stage documents d correspondence
80O7Q1O-47B Forwards uel) charts for BOOkl 1-18, Ba 1 lly uells u/o
recorders. pond levels. pneumatic pressure transducers b water
nrtar readings for SOOilO !c USSS wells for B00617
flOHM,H J Northern Indiana Public Service Co BO/Ofi/24 Gflpp
HOQ731Q176 Forwards NRC evaluation of GE rept, NEDE-24010-P !• Suppls
1-3, "Technical Basis for Use of Bquare-Roat~of-Sum-of-
Bq.usre» (SR99) Method for Combining Dynamic Loads for Mart
II Plants " Rept acceptable subj to certain constraints
MATTBQN. R J Division of Safety Technology BO/06/35 3pp
BQO7230O01 Forwards statement of policy re requirements to bo mot for
current OL applications, as derived from NUFiEQ-OtdQ !, found
in NUREG~Oi94
EI3ENHUT. D 0 Division of Licensing BO/06/St, 2pp
BOO 723 0*81 Summary of 000612 meeting ui/Mark II owners group in
BlthBida.MD re lead plant closure & long-term program Mods
should be made to generic lead plant condensation
oscillation & chugging pool boundary loads Vieugraphs end
ANDERSON, C J Generic Issues Branch 80/07/03 57pp
HOO7a3O17fl Notification of BOQB05 meeting ui/ropresentati vcs from Mark
II owners group in Chicago, 1L to discuss lead Mark II plants
chugging fc C/0 load spues
ANDERSON.C Quniirlc Issues Branch 00/07/23 3pp
0 Ad jud Icatory correspondence
Q Inspection
IE Bulletin'.. ' r orrc--poridBriLe
B00714Q5Q8 Foruaiils 1C Bulletin HO 1.1, "rr,,t k ing in Tore Spra
KEPFLCR.JG fipgirm J, Ihnagu, OlFl
B007010I32 Forwards IE Info Notue 80-P.l "Lciss of ESiiLtlon to Emergencij
Feeduiatrsr Pump'- " No ujriltu
KEFPLER.J G IVegiLn !
QA Programs " Ha writte
6007140333 Forwards TE Bulletin SO-H, "Degt-adat ion of BUR Scram
Discharge Vol (.dp,,!, 1 1 ity ' Nn urittin reipDr^o inquired
KEPPLER,JG Flegron !. thiiagii: Dfficu of the Director B0/0(b/ia
lp
BOO72BOi35 Forurririli If. Info Notitp 00-2B, "Prompt REportinrj of Info in
Accordance W/10(FR'iO 59(e) " Nn uritten responar; roquirotf
KEPPLER.J Q Rpainn 3, ThiLago Office of the Director 60/06/13
BO070203137 Format-as IE t irrular liO-15, "Losa of Reactor Coolant Pdjmp
Cooling (• Natural Circulation < DO Id nun " MD Krittcn response
requl feel
KEPPLER.J G Rngjon 3, Lhuugo, Office of- tha Director flO/Oi/30
IP
BO0714OOO1 Response in opposition to AE1.D provisional order in CP
•«t»nsion proceeding Urges immediate conaideration of
•VACUBtton alternatives prior to const
CRABOUSK1,A M , ORABDWSKI. 0 V Affiliation Unknown 80/06/24 Ipp
B007170S01 Fot-uiards 1C Circular £10-14, "Rddi oat two Cnntami nation oF
Plant DeminErdlid-rf H.itt'r Syv ': Resultant Internal
Con tamina t lun of Persnnnel " Nn written rpcponse required
KEPPLER.J Q Fu*gmn 3, Chicago, Office of the Director BO/CA/24
B00731O243 Forward* Commlsiion BOOSa? memorandum ft order containing
decisions on UCS 78O902 petition for reconsideration of
709413 memorandum & order DCS 771104 petition sought action
ri Fin protection for electrical cables
EIHENHUT, D 0 Division of Licensing QO/Oi/25 B9pp
SO07020453 Response to opposition to ASLO BO 0530 provisional orde-r
ruling on interventions fc scope of TP extension proceeding
Urjos revision or clarification re issues & atds uhlch
tatinot abide OL proceeding Certificate of Bvc end
BBtTA.K H , FRANTZ.S P , EICHHDHN.U H Northern Indiana Public
Service Co SO/06/30 llpp
B0070H0021 Submits statement of objections on behalf of util in
reipoiTBe to ASLB special prehearing conference provisional
urdvr Urges ruling on contentions as previously filed due to
uniuecessful negotiations Certificate of Svc enc 1
SHEA. K H LoujenHteln, Neulroan. Reis, Anelrad t. Toll 00/06/30 4pp
B0070-B.OO26 Response to ASLB B00530 special preparing conference
provisianal order Urges issuance of revised order to answer
• hort pilings o.uestlons Adopts reuurded Contentions R-I
1-19 Certificate of Bvc encl
GEKULER.S N Illinois, State of BO/O&/3O 12pp
BOO7O30053 Response in opposition to ASLD 000930 special prehearins
conference provisional order Requests revision of reworded
contentions d urges that short pilings questions be answered
biithln 1O days W/tiotice of appearance b Certificate of Svc
VOtLENjH J , DSANN.E M liaak Walton League of America. Porter
County Chapter VDLLEN, R J Vollen, R J SO/Oi/30 Slpp
S007330333 Foruards IE Bulletin 90- Id, "Pot&ntidl Ml tappl icatinn of
Rosemount Inc Models 1151 !i lllr? PiPBauic- Transmitters
W/Either A or D Output Cndpn " Written rct-pansE requiriid
IE Circular 90-li also encl No written re&ponae required
KEPPLER.J Q Region 3: Chiragri, Office of the Director 80/Oi/27
0007550630 Informs that (,£ b ^eryeiit !< Lundy engineering has bee
stopped temporan ly, line tu project delays Util unable to
obtain necessary Info for ruspon^t- tu IF Bulletin BO-09
Responae gill bu Biilimitted by fllOiOl
SHQHIliE M Northprn Indiariri Public Seruice Cn 8O/07/O9 lp
^ ladle up er it Ing reports
:spondence
BOO7110439 Forujords uiell chart!, fiir BOH61B-25. Rai 1 ly Uelle ui/o
recorders, pond level s. pneuniiit ic pressure tran:diit. ers !•
uater meter reaillrrgs (-or OOOftJS !, USOS uel IB for BOOi^l
BOHN R J Northern Indiana Public Service Co QCl/07/07 34pp
8007230141 Fnruisrilg "1979-1VBO Annual Rept Quilly Nuclear 1 Sits.
Encompass inu Apr 1979-Msr 1100," Hiith annual ecological
monltnring program rept
PUflCELL.J F Nut- thorn IndiariLr Puhlir Service Cn 80/O7/07 lp
— BOD7561H4/ "IVft-ttV Annual Hept- Daillij Nuclei 1 Bi Ce, Encompassing
Apr 1977-Har 19E1U. " siill. annual eralngical mnniloring
program rept
a TOI.IB InsttumcntB, Inc 110/06/10 425pp
B007150DS6 Notice of appearance in CP extension proceeding Certificate
of 9vc oncl
MUflRAV.M J Illinois, Stato of BO/07/09 Ipp
H. General correspondence
BQQ714OO2B Forward i J Seed 1 tr directed to B Elienstat ui/RD Folsom
BOO i 20 response tt Mhite House tracking uiarksheet re plant
*lte fc design Urges return of documents to agency liaison
after appropriate action
SEAL.H.H President of US J- Executive Offices 80/06/34 Ipp
B007100H3S Protests t, appeals ruling that evacuation !. other
significant issues will not be admitted: by NRC to facility
CP hearings People must be allowed to speak at hearings
Certificate of Svc enc]
SCKULTZ,0 Affiliation Unknown BQ/Oi/29 3pp
8QQ721046U ForuarOs usll charts tnr tl[H)6;>5-uVO,2, Bat 1 ly uells u/o
recorder s, pond 1 evel r • pnt<jm<it i r |'if,-ure transducei 5 !* uater
meter readings f»r 800703 !. UM.G (uells for BOO/01
BOHNiH J Norlhem Indiana Publli 'lurvico Cn 00/07/16 -39 p p
6007300110 FnruiardE Lioll rhar ts. Dai 1 ly wells, ui/n fee orders, pond
pneumstii proa'iire ttansduc i>i ' tt tuatir old er icdrlini)B for
B00709 *, USCS uplls fnr a007(iU
1QHN.R J Nnrthern Indiana I'utilir Service Co HO/O7/1B 34p
Q007a80flH3 Foruarrla uell rhaits t-iyr Q')0709 ifc.Dailly uella ui/o
recordiTS. pond levels, pneumatic |.iLr,t.ure traiisducers !t
water meter reriittng fur 1100/16 !. USHS Lii>ll5 fnr BOB715
BOHN, R J Nor them Indinn.i I'ulilic '.pr.rtc Cn (JO/P7/P2 34
226
DOCKETED ITEMS
DOCKET 50-368 nHK,,NSi,S NUCLEAR QUE- UNIT
on plans
S007O7014B Dotumpnts rjFIC telion ti approval of temporary eiemption tc
ensting emergpncy Blan. Section 431 1-C requiring
decontamination shouier facilities in emcr gency continl ctr
TRIMBLE. D C Arkansas Power '. Light Co BO/06/27 2pp
8007230073 Notification of H'J07?2 meeting uMR Pouer t. Light Co In
Bethesda, MD to review proposed eai]y warning sys
V1BSIWO. O S Operating Reactors Branch 4 00/07/16 2pp
0 Ad jucli c atari) correspondence
BOO7310J43 Forwards Comnissiun B00527 memorandum t< order containing
decisions on DC"! 700503 petition for reconsideration of
7B0411 memorandum !< order UCS 771104 petition sought action
re flic protection for electrical cahlea
EISENKUT, D G Division of Licensing 90/06/25 B'PP
rl General correspondence
9007110449 Requests response to encl fi Laceiupll Itr re plans to
increase facility spent fuel storage pond site
GETHUWE,E House of Rep BO/04/30 2pp
8007010024 Suhmits updated info re admittance of NRC personnel to
Facility fiequeits that permanent nonempl oijee picture badges
fc site orientation be provided W/o encl
BEVFRIT, K V (legion 4. Dallas. Office of the Director 80/06/16
B007070253 Responds to NRC 800410 Itr requesting that all licensee*
amend Tech Specs so that definition of term "operable"
uould be consistent u/NRC STS Revision ulll require at le««t
90 dans
TRIMBLE, D C Arkansas Power ti Lujht Co 80/07/Q1 2pp
BOD71BO429 Informs that util is Interested in participating in NRC
research program for Interim rel i.ibi 1 ity evaluation praara«>
discussed in B00612 meeting
TRIMBLE, D C ArVflnsae Power t* Liqht CD S0/O7/O1 3pp.
8007230001 Requests submittal of application for amend to license
consisting of Tech Spec changes I. license condition* PWR
Model Tech Specs ti Model license ronilitionB for TMI-2
Lessons Learned Category A items pncl for guidance
EISENHUT, D 0 Division of Licensing 80/07/02 69pp
B00716034B Submits info re RCP nil lollsction sys par R Naptln request
Bys not required to fae solsmiially qualified
THIMBLE, D C Arkansas Power & Light Co 00/07/08 lp
B00721O023 Requests info ra B006S4 loss of offslta power tp«niient at
Unit 1 Info Includes description of awitchuard operation-
process computer printouts of alurms durlnfl trannlant t
itrlp charts for prlmarg & lecondrjry sys
NOVAK,! H Assistant Director for Dperatinfl fi*«ctor« BQ/07/OB.
2pp
B007240311 AdviBBB of NRC rsorflanl jation on 800430 which retulttd in
number of cliangns in ofc ti tl B*< poii tlon* fc aiiignm*nt> of
personnel. Also submits info for OETR
NOVAK.T H Assistant Director for Dfitrating Reactor* 80/O7/08
B00707Q020 Requests that uti 1 ni nvide IE headquarter!, u/microf iche copy
of listed PMOs
MADSEM.S L Rpjjiori 4. Dallas, Office of the Director BQ/0&/I6
2pp
B0071S0394 Advises of continued compliancB u/current pBgulatlon* re
hydrogen production from clad-uater rvactinn *fter
installation of fiC9 vents per NUREO-0578 Procedural
guidelines mill be lubmitted B10101
TRIMBLE, I) C Arkansas Pouier tt Light Co 80/07/1O Zpp
BOQ725Q07O Sespunds to encl BOO'504 Itr to President Carter re nuclear
energy Use of both coal !• nuclear ppiuer necessary to free US
of overdependence on foreign oil President Carter 79I2O7
press release (< energy plan encl
DENTDN.H R Office o? Mjcli-flr Reactor Regulation, Director
BO/06/S7 32pp
B007390040 Respond* to memo TV fuel adjustment clause provision that
would permit passing 70X of cost of raplacemrnt power on to
ratepayers NRC would present any info at formal hearing No
investigation planned
VOECELI.H J Office of the Executive Legal Director 80/07/1B.
2pp
B007100H9 fteqiie^t-s removal of TD Connei from li&t of correspondence
recipients tt .addition of tj Reynolds Licensee ha; channed
legal representation
TRIMBLE. D C Arkansas Pouier ', Light CD 80/07/03 Ip
BOO7310331 Responds tn BOOA2D Itr re B00510 evpnt at Unit 1 Forwards
LER BO-015/01-0 & IE Insp Repts 50-313/80-07 t. 50-36B/BO-07
Discusses treatment of spilled water ti radioactive content
of water W/o enc 1
SEVFB1T-K V Region 4, Dallas, Off-ice of tfte Director BO/O7/13
Spp
BOO 7380222 Tech Bpst change rtquest to ollou continued optration of
plant Qualified radiation monitors ulll not be available
in time to moot ^listing T*ch Spues effective BOOBOJ Cl«««
It fee encl
STEEL, C L Ardansa* Pouer t. Light Co BO/07 /El 4pp
-- B0072B0234 Proposed ravliloni to Tech Bpecv, fagen 3/4 3-3? through 3/4
3-42, constituting Mind 7 to OL Change allows continued
operation beyond H00731 *nd dat» for Interim mithod of
determining past-accident radiation levels
* Arkansas Pouer h Light Co BO/07/21. 4pp
P Operating license it ago documents l< correspondence
Q Inspection reports. IE Bulletins b correspondent*
BOO7230099 Bequests BUbmittal of proposed Tech Spec changes providing
for redundant!.; in decay heat removal capability in all modes
af operation Hridel Tech Spec a uihich uould provide acceptable
resolution encl for guidance
EISENHUI.D G Division of Licensing 90/04/11 fcSpp
B007030194 Respond* to IE Bulletin 80-04. "Analgsie of PUR H»in Steam
Line Break in/Continued peeduiater Addition " Sufficient
time uould exist for operator to Isolate affected once-
through steam generator in event of overpreiBUriiation.
TRIMBLE, 0 C Arkansas Power b Light Co BO/03/27 9pj>,
600701O53S Summary of QOO919 meeting u/util (, C-E in Qcthesda.MD re
core protection caJcuHatinn syr. software Bii issues
identified for forfher consideration before implementation
in plant softuidre List of attendees tt 311 issues encl
MARTIN.R Opersting ReactoTB Branch 3 80/06/18 4pp
B0070B006i (U-spandc to NRC BOO515 request for info re QE turbine discs
Unit 2 turbine is impulse rpa: tion. I • SOO rpm, tandem-
cnmpound. four flou. tiuo-stage re-hen t unit Hours of operation,
number of turbine trips d overspends encl
CAVANAUOH. W rtrfcansan Power I. Light Co SO/O6/36 Bpp
SOO7I304B9 Appliifltinn to amend Licenses DPH-51 J. NPF-6, deleting
requirement fu> testing reactor bldg smoke detectors uhlle
reactors remain critical Suggested changes to Tech Spec
pages & Class III fee encl
CAVrtNAUGH. H Arkansas Pouier & Light CD BO/Oi/26 2fp
B0071'j04V4 Sugai-sfi-d ihango'-, to Tetli Sppc Pages
fire dictec 1 1 nn instrumentation
* Arkansrti, Pinner ', Light Co BO/Oh/36 Ppp
3-43 t. HQp re
0007020269 Forward* IE Info Notlc* BO-B2. "Dreakdouni In Cont»«inatiPn
Control Programs " No written response required.
BEVFRIT.K.V Region 4, Dalle*, Office of the Director 80/08/38,
IP
8007210343 Forward* IE Circular BQ-13, "Qrld Strap Damage in
Mestlnghouse Fuel Assembliei " No written response required.
SEVFRIT,R V, Region 4, Dallas, Office of the Director 80/09/88
lp
B007010040 Foruard* IE Info Notice BO-aSi "Lou of Suction to E«eroenc«
Feeduater Pump* " No written response requirod
BEVFfiIT,K V Region 4, Dallas, Office of the Director, BO/OS/SV.
Ip
0007230177 Forwards IE Insp Repts 50-313/80-07 & BO-3iB/eO-Q7 on
B00422-0321 Ik notice of violation.
MAD5EN,o L Reoion 4, Dallas. Reactor Construction t< Englnearlng
Support Branch BO/06/03 2pp
— S0072201BB Noticn of violation from in*p on 800438-0931.
* Region 4, Dallas, Office of the Director B0/0*/04
lp.
227
,00732(1197 IE Insp Repts 30-313/60-07 1. 5D-36B/00-O7 on HQ0423-0521
^C None ompl lance noted Incomplete written procedures.
X Insufficient adherence to piucedurut !i poor hous-el eep ing
measures
HEBTERMAN.T F . JOHNSON, W D - CftLLrtHAN. L J Region 4, Dallas,
Office of the Director flO/06/04 18pp
X 7020301 Respond! to IE Bulletin HO-03, "Vacuum Condition Resulting
n Damage to Chomtcal Vol Control Bgs (CVCM Holdup Tank* "
nly Unit 1 reactor coolant maim-up tank & Unit 2 vol
•Control tank could contain appietkable amounts of hydrogen
C Arkansas Power & Liaht CD 00/06/10 3pp
Forwards IE Info Notice 80-36, "Evaluation oF Contractor
Programs " No written response required
JfEVFfllT.K V Region 4. Dallas, Office of the Director 30/06/10
Forwards IE Info Notice B0-a7i "Degradation of Reactor
Pump Stuita " No specific action or rHijnriSE
KV Region 4, Dallas, Office of the Director BO/06/11
W)7a003-19 Forwards IE Jn«p Repts 30-3I3/BO-O9 t. bu-3t.8/00-09 on
&" 000587-30 E. notlcu of violation
(4ADSEN. 0 L Region 4. Dallas, Reactor Op prat i one Nuclear Sup. port
Branch 30/06/12 app
^0007300333 Notice of violation, from map on B00537-30
""" • RflBton 4i Dallas, Reactor Operations Nuclear "Support Branch
OO/Ohfll In
_ IE Insp Rapts 50-31 3/BO-0-? t< 50-363/60-09 on 800327-30
Nancompllanco n-oted failure to adhere tn procedures for
handling timporarij mod 5 tn jumpers b bypasses
YANDELLiL A , WE5TER.MAN, T F Region 4, Dallas, Office of the
Director 80/06/11 Spp
OOO707O17H Atfc receipt at O00329 Itr ir-Poi-mins NF)C nf stop* taller. to
correct violations n>otBd in IE Insp Rapt* 50-313/BO-Ob
Si 30-360/90-06
ttADSEMi 0 L Region 4, Dallas. Reactor Dperattonc Nuclear Support
Branch 80/06/17 lp
Forward* IE Invest! gall an Dopts- 3(1-313/00-09 t. 3D-369/BO-OQ
on 9O0510-12 No noncompl iance noted
BFIDUN, S D Region 4. Dallas., Fuol Pacilitij t. HatenaU Safetg
Branch BO/06/20 3pp
-- 8007330237 IE Invelt iijation Repts 50-313/60-09 fc SD-36H/00-OB on
B00510-12 No noncompl iancp noted Major areas inspected
radio logical conditions & environ impact associated ui/main
coolant pump B-eal failure
BHQWN.Q D RBa'nn ^' Dallas, Fuel Facilitu t Matff>-IaU Bafatij
Branch WILBOrtN,U Raglan 4. Dallas. Office pf the Ui rector.
BO/06/1B Spp
OO0724O03I PoruardB IE Circular 90-19, "Loat of RBaetor Coolant Pimp
Cooling & Natural Ci.riii-l.ati on Coiildoun " Ha uritt«n response
rtqulr-ed
BKVrRIT.K V Region 4. Dallas, Office of the Diroctor BO/Oii/HO
IP
^007300320 Acd receipt oP BOObSJ Itr informing N3C of steps taken to
corpoct violation noted in IE In*p Repts 50-313/BQ-07 (.
HAD8HM, 0 L Region -4. Dallas, Reactor Operations Nuclear Support
Branch QO/07/3E lp
RBtponds to NRC BCJ0603 Itr re violation noted in IE Inap
Repts 30-313/00-07 H SO-368/aO-07 Correcliva action?
junction boi cover replacnU & floor on end qlospil
TRIMBLE. D C Arkansas Power & Light Co SD/Ob/27 2pp
07300329 Ack receipt of 900702 Itr Informlna NRC of stapt taken to
correct violation noted In IE Insp Reptu 30-313/ao-O1? b
50-3A8/BO-09
HADBENi O L Region 4, Dallas, Floactor Operations Nuclear Support
Branch BO/O7/SB IP
^8007300333 Reipondi to MRC BOOA12 Itr re violation noted in IE Insp
Ript« 30-313/90-09 k 30-3hO/80-09 Corr-ectiVE actions entries
In jumper b bijpaii log. uero clcarffj Comp ] eted pages of log
u«re forwarded to files
TFIMBLE.D C Arkansas Pouor !. Llyht Co BO/07/O2 2pp
8007aiO3BI ForuniTits raant
TRIMBLE,!) C Arkansas
tratiruj icpt ^a^ June 19BO
:, Ught t.0 PO/07/l'i lp
— 9007310383 Monthly operating
90/07/15 3pp
9 Reportable on urr ertrvs, Lfcflt tn i«lr>teit c u>
0007010337 Forward* LEH aO-O32/O3l -0
TfllMBLE.n C Ai-V.niEa* Couier t. 1-iflht Ci-
—6007010535 LEFI i!0-03a/O3L-0 on £100525^ Jur irifl Mode 1 nner-a tion, p lant
computer faileil on three utfiJsinns C-iiisp urvdetprmi ned
Computer snftiu^rp diagnostic noutinct or backup cDmpuior GIJI
uill lie pun hasc-J tu allr^iatt iirDblcrns
PENDERGRAFTrf! ArV.msas Povittr b Light Co BO/Od/ai lp
BOO7010436 For
THIMBLE, F> C
ard? LER BO-OT1/U4L-O
Arkansas Pouei 'i Light Co
— 3007010^4) LER BO-031 /04t- -0 cjn eOO5?7i (liirinfl Mode I Dpevation. c
gas sample munitur 3R1TE (Jii'TJ ujs Found i napernult' Radiation
levels uEro ruirmal par Teed Bpi-ts CaiiBed by bearing failure
on sample motor ETnij i tieeri ng evaluation underyay
Arkansas POUPT h light Co fiO/Od/SS lp
BOO7HQ63I PNO-IV-BO-OP3 on UOD^4,all offsite poiucr to both units was
lost uhen two line', were tt ipppil bij iliepatcher Tlurd lino
was out of svt for matnt
HUNH1CUTT, D F) eg ion 4. D-allati OfFnt; of the Oi ret tor BO/06/25
2pp
0007010407 Forwards LER BO-oy-l/€3L-O
TRIliBLE. B C ftrkflns.03 Pouor fi UigM Co
— B007010414 LEft 00-034/03L-0 or. 300531. durina llodu 1 operation, liak
developed on Lhriigliij} pump B sn-itiiiri jnpe at coupling For
capped teat i onnecti on line Cauieil by vibration Defectivn
pipe spool pteie will be Tcp-laceit
SHIVELY. C N Arlansas, Poioer 1. Light <o B0/0i./e6 lp
B0073BQS4i, RDs 50-31 J/BO-H."1 !, 50-ni8/bO-04H on 800*31. eventa occuired
on SOD kv poufr lines utiitli resulted in lota nf nil SOO kv
power lines tr reactor trips of both units Can 50 not stated
Doth units stable Fa 1 1 nuuc n-pt uill tii- tranf-mli teit
Q'HANLON.J P Arkan-ssa Pouer t. Light Co
B007O10137 Foruardt updated tFR BO-OBS/OIX- I
TRIHDtE, D C rtr*jnsas Power !. Light Cn BOV06/?'
— B007O1044O Upaatud lfc.fi SO-UV5/03X-1 nn OOO'J07. a iirinQ Made I operation.
valve 2CV-5657 aids isolated tc. facilttdtp melnt uurk !c
alarm indicotpd volvc oppn uticr, vdlvi- uo<- cloti'd Caut-ed tij
batked out srrau leaving '-untrh mn-all^ned flwitcli rcallSTied
PENDERGRAFT, R Arkansas Poiupf t< I ight Cn BO/06/27 lp
B0070B01tO Forwards 1 tR BO-O31/OJI -O
TRIHBLE.D C Ark3ns..io Pouisr ?' Ljoht Cu HO/Oi/^7 lp
— B0070BOI66 LEfi BU-O33/Oai ~0 on Bt]O53(). dtii ing Hade 1 Operation, plant
protec tion nj>i C high B'O dolt,-) P trip was bi^pd? •vod Cauaad
bg Failed poujbr supply lin bistnlilP t<ir* DliLable Lard
replaced ti pldnt proteciinti &g« tcsled
PENDERQRAFT.ft ArVfln»aa Houpr t, light To 00/(ld/S7 lp
B0070B0171 FoTuarrl* LER 80-f)3(i'f)2l-0
TRfMDLE.DC Aikiinsah Payci f< Light
— HQ0708017B LF.R HO-036/O^L-n on fltlOfcOH. dnr ma Wr-if I op B cation > Steam
driven Enerapncy fetduidti'i pump Kt*7t\ fcpi|ipeil on overspeeil
fol louiin-g manual st.irt Catite rmt determined Pump will be
tested Frequently until ti >c prublriti ret&lvui)
PENDERGRAFT, rt Arkansoi PDWIII- }. light Co BO/0(,/37 lp
B007a00ci4i. FonumdiL LEft SO-Oa^/O^L -0
TRIHBLErD C Arkansas Puuiei t. Light Cn
— B0072H063& LER BO-OS-i/OIlt 0 on Br>l>6Qli r ontatnmeut sipmp level IndicaSor
2LI-5A41 itidicaleil approt 30B. n( UT n3 1 uator ImH liean
drained Prom tump Caused bij mau"«'tfi beiny cltlachcd from
float ball on Itvel switch JH.S-Rli'*! Pleat liflll replaced
PEMDERORfiFT- R ArVnmaE PtuiPi !, Light t.n 00/06/30 lp
228
DOCKETED ITEMS
BOO7OQ0144 f-ot U.IT ds ULIi
TR1MHLE II C AiV.nii,).,
--a0070nOtrvfl LKR BO-d40/OiL -O »n fiOOSU'., ,lnr in<| nmtnal shutdown operations
in Mmlp a, efliiTgLTitij fpedu.itu i.upjily J-tlvt PCV-1075 failed
tn upcn on c Diamond Ciiii-spd by lunsi cnnniLlinn on valve
operator twlui I us a (.i,nnc>c 1 1 cm i leaned '< tightened
SHIVELV.C N Arkansas F'uwei >i lirtht Co 80/07/02 Ip
Q0071103B3 Forwards request f-or add! info re reac
rovisui nf application for OLs
VQUfJGBLOOD, D J Licensing Drench 1 BO/06/30
3pp
80071604B6 Forwards TMI review item schedule, designating principal
branch review reaoonsi bi 1 1 ti es
BIFiKEL, R A Licencing Branch 1 BO/O6/O3 4pp
£3007090336 (-
TRIMRLE. 0
t da I FH BCi-0 WOJl .)
i tansfls I'owci '. Light to BO/0//OJ Ip
— BQO70W-j:it> I TR HO03U/0 !l -l> on UUOfr>>7. tijfi-ty injection tank found tc
have Lamp) ( H>nc r-n t ri»t i mi ltf>s t hdri Terh ^ppr Probably
rauseiJ by hnxiri itra C i f ic«t i tin iidpi(u.ir ij nf vamplnig method
to be determirifJ
PENDERCRAFr.li Arh«r.Ed-, foucr '. I i9ht Cii FO/07/03 Ip
BO0714O196 roruiniiib I.ER a()-(l43/(>l C-0
THIMDLE-U C AT-karisai PiiMi-t •< light To SO/07/07 Ip
LEU HO 04,>/0ir-0 on BOO*' IV u/Mai;M tiiuot 'jOO kV tranamission
line nut tif svc. Mob rival L> *ilj(i kV tripped on gruunil fault
C.iuacd by flrnund Fault ', resulting overloaU
SHWfH.V.C N Arkansas Fouei !. Light (o RO/07/07 Spp
3rd a LER BO-04 1 /O.iL-0
Ai k.ins.i', POUIIT !. Light Cn BO/07/01? Ip
TRIMBLE, D f
BOO7170696 Forwards schedule tor review of TMI-2 task force items
including designated principle branch review
responsib i 1 ities
BinKEL.R A Licensing Branch 1 80/06/30 4pp
B007230633 Forwards std order for DDE uiork
MATTSDN, H J Division of Safety Technology
BO/06/30 3pp
FIN A-HS1-0
— 3007230652 Std order for DOE uiorV "Review of Auxiliary Fveduater BIJI
FleliahUity Evaluation Studies for Diablo Canyon 1,
HcQuire 1 , Summer 1 & San unoPre 2 & ECCS Reliability
Analysis of Manual vs Automatic " Issued to Sandla Labs
GHEN1ER,D L Division of Safety Technology FIN A-11S1-0
QO/04/27 9pp
BOO7080345 Foruiarde info fr drauiinfls re USB of Category 1 matonry
walls for supporting piping It cprnponentB. in response to NRC
BQQ421 Itr Draiuinos available in Central Files only Fourt>«n
illegible drawings end
PARKER, U 0 Duke Pouer Co SO/07/03 57pp
— 80071-lOiitC) LEI* RO-0-)1/03L-0 on OOOfilO, during Mode 1 operation, p lant
computpr Lias tdken out of avi tendrring CHLSB inoperablE
Computpr (USE takon nut nf svi to ti ouhl eshaot problem re CRT
dlsplayii Bar hop plant (.omyutDr will be installed
F'ENDEHGHrtFT, !? rtrk.m'.iii Power T. light Lu EiO/07/09 Ip
fiO071BOfi03 Foruiarbs LCFI QO-OJ9/OJL-0
rniMBLE, D C Ai kritisas Poiur-i ', L.ght Cn BO/07/05 Ip
B007170tBS Requests eddl info re reactor sys
YQUNQBLODD.D J Licensina Branch 1 BO/07/O3 Spp
8007110309 Forwards Chem-Nuclear "Process Control Program for CNSI
Mobile Solidification Units Using Doui Process "
Affidavit for uithholdlnp oncl Program uithheld
(ref 10CFR2 790)
PARKER. W D Duko Power Co BO/07/OB Ip
— OOO71'iO(j'?J LEII HCi-Oa'J/O.lL-O on B00610. dunns llode I operation, stea
driven Dmiiryi-ncij Ft'tduatpr pi>mp 2P7A ujoulif not accelerate
atove liOOO T pm jfttr s-uccetafiil start Caused by incorrectly
kJiied loail frura ramp gerjpralor to EGM guvernoi
PENDERBRAFT, (i Arknns.i- I'quer J. Light Co BO/07/09 Ip
00071BOOi9 Re^uefits that protection sys design be rovisued to determine
degree of conformance to listed criteria Review results
should be submitted by 800B04
VQUNOBLOOD.B J Licensing Branch 1 BO/07/07 Spp
B00715Qt94 LFR 7*- 1(10 hag been rrincplled
COLLINS. M ArkdiiB.if Pouer !, Light Co BO/07/11 Ip
H0072IOJ9(f Kor
TRIMDLEill C
irtls updat«tl
Arkansas PUI
(* BO-OIH/01X 1
*, Light Cn BO/07/ H Ip
— fl007?104(KJ Updated LFR BO-01!i'(i3X-1 nn 80H-10 /, f o] louiing loss of ofPsitc
power ti iinn 1 i-iit, I'mi'T gcncy fcpduatpr floui Eietome erratic
Prubablij L.iu'.yd hy ha-itinn «F Fpediiialur tiain ui/n forced
Clou), fll 1 owing u,i(er tu drdin b.ii k to iimdensatu pump
CLDOUURNiT rtrh.in'.as POUJIT ', Light Co BO/07/lfl Spp
(3007310331 DisciiiKC-, WQtQi, routine surveillance teet on emergency
uteam driven fti-Jujntur pomp during wh 1 1 )i eleam leiik
dei/olnped Rpniie-,Lr, that «ns of five Failed studi be
ilelkverpd to Ps-i ami'ter 5. I nc For .in.ilijsui
MADBCN.Q L Region 4. Odllos. Ht.ictor Dpprfltiotis Nucloar Support
Dyanch 00/07/15 Spa
8007230137 ForuiarrlH Bummary of 800602-06 human factors engineering
control room revieu Certain deficiencies must be corrected
Requests meeting u/util to discuss matters before B00725
YOUNOOLOOD. B J licensing Branch 1 BO/O7/10 19pp
BO 0723 01 98 Discusses augmented lout power startup test program for near-
term OL applicant* Each applicant must perform teats similar
to TVA proposed program for Sequoyah
EIBENHUT.D 0 Division of Licensing 80/07/10 Spp
Q0072103B5 Forwards response to NRC 800633 request for add] Info re
secondary mater chemistry monitoring program Info provides
administrative control rept parameters
PARKERrW D Duke Poiuer Co BO/07/lfl Spp
8007330336 Forward* revised draft environ protection plan
(nonradiolonical) Also requests that NRC not Incorporate
document as part of OL for facility
PARKER, W D Duke Power Co BO/07/17 Bpp
DOCKET aO-Jdi9 WlLLIflM B MC&UIRh NlirH-Afi fiTATION, UNIT 1
A Appl ica t inn/tiinsti ut tion stago Uncuments d cnrreapondonco
HQD711OS1') Nntjf ti .itnon of OOllblfl mr-otum ui/uti) in IJethesdo.HD to
riincuts iil.il Hji".n)n rfvii'iu nl innticil room
A t n eii'.inij llr.i'iin 1 Sd/(J1/JO 3pp
B007010S71 Adviuf Dial NRC BOOIO* reniie-ir for independent plant-wide
audit of in'. till l.itinn of Si.f c ti|-rcl.itcil cqtnpmeiit ,', cables
need not bp fn 1 f 1 1 liit, bjmt pn ail ill inft, provided in util
S006O5 1 li
Dfllt, B i I iecmsing Unnth 1 HO/Ofe/70 3pp
.007090091 Mnfjficrttion Qf ft(t06,i'i~27 n>i<eLing w/util tn discuss TM'-H
attlon plrfn itrrn' AgLndn inrl
A I in-nt, inn fir.iiM t, I Hu, 06/20 Spa
6007230001 Formai- in stitemont nf puliLu IP icquii«raHnts to he met for
current PL app U( jlions, ,i« dpnved from NURFG-0660 ?. found
in HJREO-0694
ElBENHUr.D (1 Division o( Ijrcnsjn'j OfJ/Ofa/Sf- Spp
8007260166 Advises that NRC has completed review of info in 800616 Itr
re reactor vessel nonles Reactor vessel fabricated usino
procedure fnr welding & pre & poat-clad heat treatments that
Increase potential underclad tracking
VOUNQELOOD, B J Licensing Branch. 1 BO/07/17 3pp
0007230369 Forwards updated pages to util S00323 ru*pon»B to TMI
concerns Matl addresses NUREG-0694 rBquiremBnts Another
revision scheduled for B 00901 & fuel loading for mid-6«pt
19QO
PARKER, W D Duke Power Co SO/07/1B flflpp
B0072B0011 NotifiLatian of 800730 meeting w/util in DflthBlda,MD to
discuss review of plant control room
DIRKEL.R A Licensing llranrh 1 BO/07/ IS 4pp
B007300439 Forwards addl info re juttif ication for reducing steam
generator low-low water level error allowance span<
supplementing 791218 b 600507 1 brs Proprietary page withheld
(ref 10CFH3 790) Application for withholdlnfl "net1
PARKER, H 0 Duke Power Co BO/07/S1 13PP
DOCKETED ITEMS
229
BOQ72S0181 Discusses onslte emergency diesel generator reliability
p«r NUHEO/CH-0660 Reliability is sufficiently assures For
operation through first refuel ing. however, certain design t.
procedural mods are required
YQUNOBLOQD, B J Licensing Branch 1 80/07/23 4pp
— B00714Q01O Affidavit attesting tliaV tC( S meets acceptance cnteri.
Hydrogen eiplosiun will not pres&ni major damage to reactor
vessel Charlotte Observer /91101 ar title t Certificate of
Svc enc I
RABIN, H H Consumers Putjpr (.0 PO/0//O1? 5pp
8007310338 Forwards request For add) info re RCS vents for review of
DL application
TEDESCO.fi L Assistant Director for Licensing BQ/07/33 3pp
F, Security, medical. emergency & fire protection plans
Q007O1Q309 Foruiards security plan far on
r«quJrei"«nt* for SNM Plan withheld (ref
PARKER, W 0 Duke Power Co 60/06/34
>ite storage & In transit
10CFR2 790)
IP
Reviews state & local emergency preparedness measures for
facility Ravi a ion 5 per NUREQ-Oo34/FEKA fiEP-1 93/. complete t.
compliance ui/NRC »tds established prior ID BOOJOl Completion
scheduled for Aug 19BO
KCCONNEUL. J H Federal Emergency ManagemEnt Agency 00/07/08 l
BOO7300077 Forwards Ulimmarij of recommendations from NSC review !,
SOO617-1B meeting re facility emergencu plan
TEDEBCn.R L Assistant Director for Llrenfiing 8O/07/23 lipp
Adjudicator^ correspondence
8OQ7140461 Statement of Board of Commissioners' position in opposition
to radwattt transportation through Qaston Cauntyi NC Urges
transportation via Interstate 77 Ic B5 Encourages (upending
•n»roij S< money for recycling W/eorreBpondence
* Cast on County. NC BO/04/HB 61pp
— 8OO714Q473 Forwards addl comments to Gaston County Board of
Commissioners ' position opposing spent nuclear fuel shipment
through county & two proposed alternate routes Author does
not oppose shipment if adequate safeguards are provided
QASTON..H D Oaston County. NC BO/04/25 Spp
8007140019 Response in opposition 111 uti I BQ0330 motion seeking
termination of stay of ABL11 79Q41H initial decision Opposes
Carolina Environ Study Croup H00h09 motion to reopen record
for adfll contentions Certificate of Svc ent 1
KETCHEN. E 0 Hearing Branch 4 ao/07/10 13pp
8007160613 Forwards re-eiecuted Cerfificsto of Ewe torrecting svc date
to B007IO re NHC B00710 responfe to \arolina Environ Study
Group motion to reopen record S< NRC B0071O response to utiE
motion to terminate stay of initial decision
DAVIS. L D Hearing Branch 4 60/07/1*1 Spp
O Inspection reports, IE Bulletins !< con espondeni: e
BO07240123 Forwards IE Info Notice 80-20. "Loss of Decay Heat Removal
Capability at Davis-Besee Unit 1 While in Refueling Mode "
No response required
O'REILLY.J P Region 3. Atlanta Office nf the Director 80/05/08-
3pp
B007020204 Foryaros IE Info Notice 60-23. "Breakdowns In. Contaminati an
Control Programs " No written response reriuirad
O'REILLY.JP Region 2, Atlanta. Office of the Director 60/05/20
B007210449 Forwards IE Circular BO-13, "Qnt Strap Damage in
Hestinghouse Fuel Assemblies- ' Ha written responee required
O'fiElLLV, J P Region 2. Atlanta. Office of the Director BO/O3/3B
IP
B00701OS13 Forwards IE Info Nutice ao-33i "Loss of Suction to Eme-roency
Fseduiater Pumps " No urittpn response required
O'REILLY.J P Region 2. Atlanta. Office of the Director QO/OSXB9
— BOQ71404BB Forwards position of Oaston County Board nf Commissioners,
NC. opposing spent nuclear fuel shipment through county b
two proposed alternate routes U/o encl
nHYNE.C A Oaxton County. NC 80/04/13 lp
8007320046 Forwards IE Info Notice B0-?i.. "Evaluation of Contractor
OA Programs " No written responGe i equlred
0'REILLY,J P Region 3. Atlanta, Office of the Director SO/06/1O
2pp
0007030036 nxpQnse in opposition to applicant 800920 motion to
tarminatB stay of A.BLB 79011B initial decision Buppl 3 to
3ER indicate* that NRC tevieuire TMI-ralated requirements, is
not complete Intervenor B00609 Itr to util encl
FtlLtY.J L Carolina Environmental Study Group BO/06/09 6pp
60O71oOES5 ForuiaTds IE Info Nutue BD-27, "DcjTad^tian Of Reactor
Coolant Pump Studs " No specific action or response
required
O'REILLY.JP Regions, Atlanta, Office of the Diiector BO/Ot/lt
— 3007030040 Motion to admit TMI-related now contentions fc to reopen OL
hearing Consequences of significant hydrogen release in
Uoctinghouse containment. were not subj of adversary
proceedinfls Contentions t< Certificate of Bvc encl
RILEY. J L. Carolina Environmental Study Group 80/04/09 6pp
BO070102B2 Forward* BER.Buppl 3. per ASLD 790418 initial decision.
LBP-7<7-l3i uhich stayed issuance of rept H/o ancl
HETCHENiE O Hearing Branch 4 BO/06/19 lp
B007250344 Foj-uards IE Info Notice 60-2B, "Prompt Reporting of Info in
Accordance W/10CFR50 35(e) " No written responSiE rpquireit
O'REILLY.JP Region 2. Atlanta, Office of the Director 80/06/13
3pp
B00702O763 Forwards IE Bulletin HO- 15, "possible Loss of Emergency
Notification Syt 1ENB) W/Loss uf Offsite Power " Wnttan
response required
O'REILLY.J P Region 2, Atlanta, Office of the Director BO/Ofa/!B
BQ0731O243 Foruiard* Commission S00527 memorandum k ordei- containing
dfltiiions on UCS 7B0902 petition for reconsideration of
780413 memorandum t> order UCB 7711O4 petition sought action
re fire protection for electrical cables
EISENHUT.D 0 Division of Licensing 90/Ot,/SS B9pp
B007100036 Responds to lix Bulletin 79-J6 re vital area a
Controls will be addressed in NHSS revieu nf facility
security plan, therefore specific response Is umieceB'Sii
PAftKEFl.M 0 Duke Power Co 80/Ob/lR lp
BOQ70a06SO Order grantinfl extension until B00707 for applicant to
respond to intervenor B00609 motion re admission of ney
contentions fc reopening of OL hearinfls record
LAZD, R H Atomic Safety and Licensing Doord Panel SO/Ot/37 ip
B007030459 Forwards IE Circular BO-15. "Lost of Reactor Coolant Pump
Cooling d Natural Circulation Cuoldnum " No ujntten i-espunsB
required
O'REILLY. J P Region 2, Allar.ta, Office op the Director SO/Ofr/20
BOO7Q90320 Foriuards. in response to B00630 request in OL proceeding,
mJREQ-0660. "NRC Action Plan Develapifd m. Result of TMI-2
Accident," (. B00602 "Further Commission Quidance for Pauer
Reactor OL*. Statement Of Policy " W/o ends
KETCHEN. E 0 Hearing Branch 4 SO/07/03 lp
BOO7HQ004 Response In opposition to Carolina Environ Study Group
motion* to add new contentions d to reopen OL hearing
Petitioner failed to comply u/hew evidence criterion
MCOARRY.J M Consumer. Pouiar Co MCOARftY. J M Debevoise (,
L-iberman, BO/07/09 13pp
B007090165 Forwards IE Inep Kept S(i-1f.9/FK3 Ifl un B00f.oe-Ofl No
noncompliance noted
KENHA.VJ B Region 2, Atlanta. Safeguards Branch 80/04/34 la
IE Insp Kept 50-.!6W90-I4 on 800603-04 No noncomp 1 lance
noted Major nrens inspnttcd prc-1 ici'nBing physical security
survey, vl tal nriai prnt<>c tod drtn t. (iliysical barriers Details
withheld (re* lOCFfiJ 790)
OILLESP1E.F P . HDUELL.J C Region 1. Chita(|o. Office of the
Director 6O/Q6/23 lp
— 8007140007 Affidavit addressing issue of hydrogen generation & control
following postulated TMI-typp accident Action implemented
•ffectivelg precludes BICBBS hydrogen generation
CANADY.K 3 Consumers Power Co 79/07/09 Spp
B007170104 Forwards IE firrulai Bit-11, 'Rddiuactive Contamination of
Plant Dflminei allied Hater "igs ». Resultant InteTnal
Contamination of Personnel ' Mo ui itt-en n>',pon^e leciuirad
O'REILLY.,) P Hegion 2, fttlnnta, Offiti. of tin Dirnctor BO/Oi/24
IP
230
0007230235 Forwards IE Bulletin nO-16, "Potential Misapplication of
Rosemount Inc Mudels 1151 b 1 1 52 Prestui e Transmitters
IJ/Elther H or D Output Coflei " tint ten response required
IE Circular BQ-36 alsn enc 1 No uritten response required
O'liEILLV. J P Region 3, Atlanta, Office of the Director BO/Oi/37
BOO73SOS9S Ack receipt of !E ln<p Repls SO-^69/80-10 t 50-37O/HO-06
No proprietary info
PARKER. H O DuNe Power CD BO/06/30 It)
—0007250603 Forwards IE Insp (iopts 50-369/BO-10 I. 50-37O/8Q-O6 on
BOQ514-16 ND noncompl lance noted
MURPHY, C E Region a. Atlanta, Hrac tor Construction I. Engineering
Support Branch 80/Ob/iO 3pp
— S00735Q&Q7 IE Insp Bepts aa-3fa7/8[i-lO & SO-37O/BO-06 on S00514-1A No
nnncanji 1 i ante noted Major areas inspected unresolved items.
IE bulletins >< circulars t, licensee identified items
HUNT. M D Region 3, Atlanta, Office of the Director RAU8CH, J K
Region 3, Atlantn. Keactni Construct! an f, Engineering Support
Branch 80/06/10 5pp
B00734Q357 flck 'eroipt of IE Insp Rept S
prnprl etary info
PARKER, U 0 Dule Power Co BO/O7/03
on 000506-09 No
--B00724O36B Forwards IE Insp Rept 10-3<>9/B0-09 on BOOS06-09 No
none onpl lanca noted
LEWIS. (1 C Region 2- Atlanta, Rear tor Operations Nuclear Support
Branch 90/06/13 3pp
DOCKET 50-370 WILLIAM 8 MCGUIRE NUCLEAR STATION, UNIT 2
A Application/consti uc tion stage documents I. correspond onto
B00711O519 Notification of 000514 meeting u/utll In Bethesda.HD to
discuss ulil design review of control room
niHKEL,R A Licensing Brantn 1 OO/04/3O Zpp
S00701O57I Advises that NRC B00409 request tor independent plant-uldo
audit at installation of safety-related equipment & cables
need not be fulfil led. based on addl info provided In util
800605 Itr
VOUNGBLOOD, 0 J Licensing Branch 1 80/06/20 Spa
0007090091 Notification of 800635-27 meeting u/util to discuss THI-2
action plan items Agenda one]
BIRKEL.R A Licensing Branch 1 80/Oi/2O 9pp
D007S30O01 Forwards statement of polity re requirBnienti to b« mat far
current OL applications, as derived from NUREO-066O b found
In NUREO-OWl
EIBENHUT, D O Division oP Licencing BO/06/26 2pp
0007110^03 Foi-uiardJs roquest for addl info I-B reactor SUB as raiult of
revisuj of application for OLs '
YOUNBBLODD, D J Licensing Branch > BO/06/30 Qpp
B00716048t> Forwards TMI review Item schedule, ties ignatlng principal
branch review ve»pon»ib 1 li tic-o
B1RKEL.R A Licerfsing Brunch 1 [30/O&/03 4pp
— BOO7340377 IE Insp Rept 5Q-J6W 00-07 on B0050i>-09 No noncDfflp 1 ionce
noted Major arfas inspected preoperational tost program,
procedure reviews !( reviews of completed preoperational
test pac k^ges
DQNAT.T J Region 3, Atlanta. Office of the Director QUICK, D R
Region 2, Atlanta. Reactor Operations Nuclear Support Branch
BO/0*/ 1 1 6pp
B007210114 Responds to IE Bulletin BO-OB. "F lamination of Containment
Liner Penetration Uelds " Welds in 22 penetrations repaired
per nondestructive teat performed during const Summary of
types lj siles of penetrations enc 1
PARKER, W 0 Duke POUJBT Co SO/07/07 9pp
S007240469 Ac k rereipt o-f IE Insp Rept 50-369/BO-09 No proprietary
PARKER, M D Duke Potaer Co BO/07/07 lp
B Reportable oci.urrences> LERs i related correspondence
B0071706fi Foruiards schedule for revieiu of TMI -2 task force Items
including designated principle branch revleu
reiponiibillties
BIRKEL.R A Licensing Branch 1 SO/Oi/30 4pp
8007030345 Foruards info ti drauings re use of Category I maionru
walls for supporting piping & components. in response to NDC
B0042I Itr Orauinps available in Central Files only Fourteen
illegible drauings end
PARKER, HO Duke Pouer Co BO/07/02 27pp
80071706B3 Requests addl info re reactor su«
YOUNObLOOD. D d Llcen»infl Branch 1 HO/07/02
Upp
8007110309 Forward i Chen-Nuc 1 oar "Process Control Program for CN3I
Mobile Solidification Units Using Dow Process "
Affidavit for withholding encl Program withhold
(ref 10CFR2 7901
PARKER. W Q Du*B Pouier Co BO/07/OQ lp
800603031^ Forwards Significant Deficiency fiepts 369/80-06 tt 370/00-OS
re fire prntDction sys valve misapplication
PARKER, H D Duke Power Co BO/09/16 lp
B007le.Q366 Part 31 rept i-e Valcor valvo Model vS2600-534~l not deilgnid
for tontinuQus operation in energiied mode Valves installed
in diesel generator control air 5i>s
BDRBD.e J Valcof Engineering Corp 00/Oi/S7 Spp
B0071A0637 Forwards Significant Deficiency Reptfi 309/BO-07 & 370/BO-06
re centrifugal charging pump operation foJlouinQ »econdaru
side high energy line ruptuie
PARKER. U D Duke Pouier Co BO/O7/07 tp
— 8QO716064i3 Bignificant Deficiency Repts 369/80-07 !' 370/SO-06 re
centrifugal charging pomp up t1 rat I on Follnuing secondary side
high eneroy lint rupture Potential elists for inadequate min
Flqu in/damage to pumps
f DuJie Power To BO/O7/07 lp
B007160069 Requests that protection BUS design be reviewed to deterntni
t»grer of cnnformance to listeil criteria Hevleu reaulta
should be submitted by BOOB04
YOUNOBLOOD, B J Licensing Branch 1 80/07/09 5pp
8007230137 Forwards summary of BQ0602-OA human factors enginem-lno,
control room review Certain deficiencies must be corrected
Reque«ts meeting u/utll to discuss matters before 000720
YOUNOBLOOD, B J Licensing Branch 1 80/07/10 19pp
B00723019Q Discusses augmented low pouier startup test program for near-
term EH. applicants Each applicant must perform tutu similar
to TVA propased program for Sequoyah
EISENHUT.D 0, Dlviaion of Licensing BO/07/10 3pp
6007810333 Foruiards response to NRC 8006S3 T-U 0,110 *t for addl info re
secondary uater chemistry monitoring program Info provide*
administrative control rept parameters
PARKER. M 0 Duke Pouier Co 80/07/14 2pp
80O7340393 Interim Part 51 rept re defective fTT actuators in dampers
Customer notification encl Jobi claasifini) nDnnuclear
• afety-relateil are not reportahle Actuators supplied fnr
other jobi are considered purchaser ruspansibi 1 1 ty
BLOAM.D.E American Warming t< Ventilating, Inc BO/07/OB 30pp
B007300330 Bionsflcant DefieievKy Repta BO-369/BO-Q9 t. 50-370/BO-00 r»
Holenoid valvis On B004S7. di esel generator instrument air
pressure •oiterwod touiitr than normal Caused liu leaking vent
Valve stroke to be modified t>r cnils re-placed
DCNrtT. T J Duke Paver Co 00/07/B3 2pp
6O0730O33S DtflcienTy rept re improper ueld colif iguration on *team
BBnarator encl stiffener ring tonnoctinns Causa not stated
Helds hflVt been (nullified tu meet design draunn)s Personnel
raini truetetf tn as*ure compliance u/design diauings
PARKER, W D puke 1'aiuar CD SO/0//P3 2pp
9007230536 Forwards revised draft environ protection plan
(nonradiologlcall Also requests that NRC not incorporate
document as part of OL for facility
PARKER, H 0 Duke Poiuer Co BO/07/17 Bpp
9007280 lit Advises that NRC has completed review of info In B00616 Itr
re reactor veisul noilles Reactor vessel fabricated using
procedure for melding & pre & past-clad heat treatmontt that
iltcreaett potential under clad cracking
VOUNOBLOOD, B J Licensing Branch I BO/07/17 3pp
B0073H036S Foruiards updated panes to util B00323 response to TMI
concerns Mail addresses NUREQ-Oi94 requirement* Another
revision scheduled for 800B01 & fuel loading For mid>9*pt
1VBO
PARKER, HO Duke Pnuier Co 00/07/10 44pp
DOCKETED ITEMS
231
0007290011 Notification of BOO/JO meeting w/util in Dethesda,MD to
discuss review of plant control room
BIHKEL. R rt Licensing Branch 1 BO/07/lf) 4pp
6007300439 Foruards uddl info te just i fiL.it mn for reducing steam
generator low-loin water level prior allowance span,
supplementing 791,210 h 800507 1 tr5 Proprietary page withheld
Iruf 10CFR2 790) Application for wi thhiild ing end
PARKER, U 0 Duke PDUIDr Co EIO/O7/3! llpp
8Q0735010I Discusses onsito emergency diesel generator reliability
per NUHEG/CR-O&tiO Reliability 15 iuf f I c i nntly assuicd for
operation through first ref IIP 1 1 ng, houievor, certain design (,
procedural mods arc required
V OWN GELD 01), D J Licensing Branch 1 BO/07/32 4pp
BOOT31033B Forwards request for addl info re RC1 vents for revleuj o
OL application
TEDESCO, H L Assistant Director for Licensing 80/07/23 5pp
F [Security. medical, emergency !, fire protection plans
800.7010309 Forwards security plan for on site stoiage *i in transit
mqiiirEoiUnts Far GIJM Plan withheld (ref 1OCFR2 7?0>
PARKER. W D Duke Power Co QQ/O6/24 tp
Revieua state ti local emergency preparedness measures For
Facility Revisions per NUHEQ-0654/FEMA REP-1 95V complete t,
compliance u/NRC stds established prior to B0010I Completion
aehoduled for Aug 19BO
MCCQNNCLl.J H Federal Emergency Management Agency BO/07/OS lp
6007300077 Forwards summary of i ecommendstions from NRC review t<
SOQ617-18 meeting re Facility emergency pliin
TEDESCO.R L Assistant Director For Licensing BO/O7/23 16pp
0007140001 RespOTi'-P ir,
motions to atfil HPU ci
Petitmner failed tu
MCSARHV, J M (.nii'iirr,;
Liberman 80/0 '/i_W
Nr(,HHr<! j M Dtbevnise !<
-B007K1000/ Affidavit d
follouing pott LI lilt yd
effective] ij [j r e c 1 u rt (.
CANADY.K S CotiiuniB
— 8007140010 Affidavi
Hydrogen eiplosi
vestel Charli.tti
Svc end
FiASIN, W H Consu
F007140019 Response in onpositum to util BdOSIO molipn seeking
terminatiori uf stjij »f AS1 P 79n1lO initial decis-ion Opposes
Carolina Environ ^itudy GT ojp fclOOfcO? motion la reopen record
for addl content i on^ Certifit .ft of ^i e-ncl
HETCHEN,E G Htarifii) Branch 1 BO'0'I/1C' 13pp
BD071d0613 Foruards re-eitrutpd Certi f ic.ite of SSL corretting svc datt
to B00710 rp NHC PP0710 rE^ponsp to (arnlina Envllon Study
Group motion to rpopen rpcDrd '< NRC POO'lO rf 5 [inrisv to util
motion to tfrminate ttay df initial deciiion
D Hes' ing Branch d ao/l/'IS 2pp
Q Inspection report-., IE Bullctn
8007340122 Forwards It Info Muttte BU-rO, Los= of Decay Heat Removal
Capability at Bdvi^-flpBif Uiu I 1 Uh 1 1 e in Refueling Hade "
No response required
0'HEIIL'i.JP Kenion 2, Atlanta. CJfficc uf tht Director flO/OS/OB
3pp
Adjudicdtory cnrroHpnndetic i
O00714O461 Statement of Hoard of Commi Edl nners ' pdGition In appo
to raduaBto transportation through GaKton County. NC Urges
tronaportat inn viii Interstate', 77 Je B*j EncDurflges eipending
Bnargij !< money for recycling W/corrpG|ipndence
» Oaston County. NC BO/04/28 61pp
— 0007110173 Torwards addl comments tn Qsston County Board of
Commissioner's' position opposing spent nuclear fuel shipment
through county t. tuio proposed alternate routes Author does
not oppose shipment if adequate safeguards are provided
GrtBTON. H B Oaston Count ij.NC SO/04/35 2pp
8007O1O213 Foiward* IE Info Notup 80-23.
Feetfuater Pump1) " No written rcspnn'-Le r
D'REILLV.J P Rtflion =' Atlanta nffli
IP
8007320040 Forwards IE Info Untitt BO-^i "fvahi
QA ProardmEi ' Ho written rr'pun?" TI quired
O'nEILLV.J P Heyion T., rttlolita DffiiP of tli
of Suction to Err
of Contractor
utter aO/Oa/10
— B0071101B8 Foruinrds position of Oaaton Tounty Hoard oF Commi ssi nners.
N^, opposing spent nuclear fuel shipment through county !<
tuio proposed alternate routes W/o encl
HHVNE. C A Oastnn County, NC BO/O4/13 lp
B007030036 Response in opposition tu dppiicant B00320 motion to
terminate atau of ASLB 77O118 initial decision Suppl 3 to
BER Indicates that NRC review, re TMI-cplated requlrBments. Is
not complete Intervenor BO0609 1 tr tn util encl
RILEV, J L Carolina Environmental Study Group BO/O6/Q9 fipp
— BO07O30010 Motion to admit fMI-related new contentions & to reopen QL
hearing fonsequenceB of significant hydrogen releasp in
UeElingnoiiEB containmont, were not <iubj of adversary
proceedings Contentions & Certificate of Svc encl
FtlLEY.J L Carolina Environmental Study Qi oup 60/04/09 ipp
BOQ7Q102B2 Forwards SER, Suppl 3. per ASLD 790418 initial decision.
LnP-79-13, uhich stayed issiionce of rupt M/n encl
KETCHEN.E Q Heating tlranch 4 BO/06/19 lp
6O07310313 Forwards Commission B00527 fnemoratidum Ji order containing
decisions on UC5 7B0302 petition for reconsideration of
780413 memorandum d order UCS 77IIO4 petition sought action
ro fire protection for electrical cables
EIBENHUT, D G Division of Licensing 00/06/35 B7pp
&OO7020620 Order granting extension until BOO707 for applicant to
rejpond to intervenor B00609 motion re admission of neu
contentions !< roopcning of OL hearings record
LAZO, R M Atomic Safety anrt licensing Board Panpl S0/06/a7 lp
B007090320 ForiuardSi in response to HOO&3Q request in OL proceeding,
NUREG-Q&iO. "NRC Action Plon Developed as Result of TM1-3
Accident, " t< B00603 "Further Commission Guidance for Power
Reactor DLs. Statement of Policy " IJ/o pnclr>
KETCHEN, E G Hearing Branch 4 HO/0//0? lp
8007160355 Forwards IE JnKi fliitirc HO- 2" "ftupr J Oat mn r.f fleactor
Coolant Pump SI ml* " No fiperifu dLtiun i,r rfsp-on>i>
requi 1 ed
O'REILLv J P Region "L. AMfl,,t,i tjffjrp nf HIP nircctor BO/06/11
IP
0007030459 rciruai d« IFCitrulfii fii-lb, '
Cooling !. Mntui.il fniuldlirr, Couldnwi
required
O'REILL/. J P Hi'ijic.ii "'. Ati>j>ilti> uffi
lp
o> 1'i-iacrar Coolant Pump
.f the D.ractnr 00/06/20
on tam i nat i on of
WT 1 1 1
IE Circular BO-lfc ^l-o rnr I t«, yntlen
0'REILLV, J P RPJ
IP
BOQ72^0D93 Ac k rfit'int irf 1C
No proprietary info
PAHKEFl.Wn UuH- I'oiiipr Ci
« ' [idTibji ri)'[ui re-il
lit>tie>e tequireit
Cirfne r,t- Ins Hirer tnr aQXOA/27
SO iu !r 1>O-n70/BO-06
232
DOCKETED ITEMS
— B007S50W IF Insp Repts *»f) 3'jV'HH-lO ' 50-370/1311-06 on B005H-16 No
noncompl iriiii..' nuted Major aiia^ i i.sptc t eil unresolved items,
IE bulletins ' urtulai' ' litt-ns'i' identit-ifil itms
HUNT.n D fiigmrr J ,1t],nt), Of me of the Director flAUSCH, J K
Region 3, rttl^rti Reatlcr Ct n = true t i ni '. Enginetnng Support
Dranrh f]Q/i)o' if> Spa
-B007I70347 Not ) ncrt t i on of 000732 meeting u/BIJFi licensing review group
in Bethearia.nD to discuss TMi IBBIIPE required For OL
tiffps '< sues uf pLnetrdti iini pnt 1
PARKER, WO [iulc F'ouier CD R:TO"tr 9pp
S Repon
169-BQ-Qi, ti 370/30-03
— 80071AOi!.3 Significant Deficiency Rents 3^9/60-07 (< 370/BO-06 re
centrifugal rlinrmnij punp operation following secondary side
high energy linn rupture potential ensts for inadequate mm
Flow u'ddrtiage to pumps
« Duliv PouJT Co BO/07/ 1>7 Ip
BOO7340353 Interim Part *>1 rt-pl i-e detpcli^e ITT actuators in dampers
safety-relatiid urn not repm trifl le Artudtorb supplied for
other jobs ^T e i on 5 i dered pur L hast r responsibility
SLOAN, D E flmtTitan Harming t, Ventilating, !nc BO/07/OB SOpp
3007300330 Signi frir.in t Deficiency Repts '50-369/HO-07 t, 50-370/BO-OB re
solenoid val^e*. On B00627, il i e' rl generator instrunent air
pressure obspi Jpd louer than normal IBiised by Icsl'ing vsnt
DDNAT,T J Duike Pnuer Co BCJ/Q7/Sri 2pp
WILSON, J N As
stant Dnector For Licensing
—800717035! Mot i f i cfl 1 1 an of 000734 meeting ui/nUR licensing review group
in BethP5dfl,MD to intrnduco HUB licenBiiiD revieui group tt
present consensus positiuna for Pouier Sgs Oranc h, Containment
Sys Branch J, Equipment liua 1 1 Fi cati on l)r.inch
UILSDN.J N rtsbistanl Director For Llcpnslnfl 8O/D7/O3 9pp
9007330621 Summary of QOOibIS meeting ui/Mark II ouinurn oroup in
BethesJfl.MD i e lead plant closure * long-term program Mods
should be msde to generic lead plant c undunsat 1 nn
oscillation !. rhuyginp pool boundary loads Vieugraplm encl
ANDERSON, C J Generic Issues Drflncli QO/O7/OJ S7pp
B00713O529 Foruiaiifs response to NRC BOf)flPl request For info re masonry
wall design Further review of masonry ujall design 16 being
Londucted at LflS.jlle to complete response to IE Bulletin
00-11 Package of 231 uversiie drawings cncl
PEOPLES, D L Commonwealth Edison Cf) 90/07/00 23pp
— 9007150537 Package of 331 cpncrete masonrij ulall drawinga to be recalled
at later date for microfilming
* Sargent t< Lunrfqi Inc BO/O7/OB 931pp
B007160ii06 Forward!. "Ccndcnaat i on Oscillation (CO) Lodil Data for
Lasalle" & "Chugging Loads for Assessment of IT CO Data "
flepta uithheld (rpf 10CF02 790) t< available in Central Files
only
DCLGEORGE. U O Commanuea 1 th Edison CD BO/07/11 3pp
S007230133 NotiPicatinn of BQ0725 mpoting ui/BWR - Licensing Revieui
Group in Dethesdii. fID to discuss ciincensus positions of
nHFI - Licensing Review Group on ICSB open issues
WILSON, J N Licensing Branch 1 BO/07/1& lOpp
B00733051B Responds to OOOSSJ !. 060-1 infd requests Info re DHR jet
pump holddoun fiuam cracking will be submitted bg EJOO91S &
reactor vessel unrierclad tT,itding info by 000701
PEOPLES.D L Commonwealth Edison Co BO/07/17 Ip
BQ07250<1'!9 Formardt Facililg Kmprgency procedures Table of contents
included
HDLYOAH.rt H Commoiiuea 1 th Edison Co BO/07/1B Ip
DOCKET SO-3~3 LiflliALLfc C.DUNTV SIrtTiOJI. UNIT 1
— HOQ7250'155 Emergency procedures for f ac 1 1 1 iy. inc lud i ng general
abnormal firor edur esi general abnormal index tt operating
abnormal Indei
* Cnirmonueal th Edison Cn 79/O1i/2r1 83pp
aoD7O30?3V fiotif i Lation of B"i)'02 meeting u/DWH licensing revieur group
in Dethesrfa. (ID tp riircuss t ariEensus position on leactor
svc bldg open issne
WILSON. J N Licencing Dranch 1 BO/06/ ID 9pp
8007950175 Notification of B00001 meeting u/reprosentati ves from Mark
II owners group in Chicago, IL to discuss lead Mark II plants
chugging '1 C/D ] Ofld spots
ANDERSON, C Generic Issues Branch 80/O7/23 3pp
Q007O10377 Surmary of B006U meeting u/uti I s. KMC, Inc. GE, Dechtel, SI.W (i
Sargent '. Lundg Hi Bethesfta, Pin rp consensus positions on
reactor svc bljg 'i isolatmn cooling sy? bldg open issues
From La Salle iluckpt Statu^ reptb enc !
WILSON, J tt Abiittant Dirncfr fnr Licensing SO/06/19 flipp
BDO7310176 FurudirJs tlR< eualurttmn of CE rept, rJEDE'34010-P t, Supple
i-J, "Technical If-isie for 1J> B 01 1"i<uiare-Bnot-Qf-1Jum-oF-
S-nuares (SR^S) Metiicd For rnmMrnng Dgnamic Loads for Mark
II Planti " Re^it .ircpptnblp tiihj to cPrtam constiaints
J liiMtion of Safely TBc^^ology BO/Q6/2S 3pp
BOO7230001 FcrunrJi. <• til t empn t (if puluy r-p r pquirement s to be met for
current OL spp 1 , t ,.tions, ,i« durjved from NunEG-0660 "( found
EISEtlHUT.D G Piviairn nf lUL-nsing 80/OA/SA L'pp
cpttng (J/Mart II lead plant applicants re
irtintb (ii define T-quencher load
jfllvp .ntunticn Neiii mi'lhudology
rt II In.id plnntS
[ft no/06/27 Ipp
B00729069B ForuardB indei for facility general prococlures Indm will
auppl general abnormnl procedures ;. operating abnormal
praccdure Indfi nlroady foruarded H/a pnci
HOLVOAK,n H Uummenujealth tidihon Co 00/07/33 Ip
B007300D33 Forwards request for add] lnfo to complete review of F8AR
TCDESCO.R L Assistant Director For Licensing BQ/07/S3 3pp
F Securityi medical, energoncy & fire protection plans
BOQ701Q347 Foruiai rts safeguards continuencij plan amend Plan withhold
(ref 10CFR2 790)
PEOPLES,!) L (.ommonuealth TdiEOn Co BO/O6/37 Ip
0 Ad jud icatoru (.ur
0007310313 Forunrris Commisaion 800537 memorandum & order containing
decisions on UCS 700^02 petition for rei one i rferati on of
7B0113 memoranihim !< order (JCS 771104 pptition sought action
re fire protection for electrical cables
ElSeNHUT.DQ Division oFLirensing 90/06/33 B9pp
K Utility Final Sflfetij Analysis Report (TSAn) C, amends
B007070P67 roruards F300630 affidavit rP H00613 ill str ibution nf Amend
io FSfln
! I. 0 CommDnweal th Edison flo BO/Ofi/S? 2pp
in for Lit arising BO/07/03 Ip
DOCKETED ITEMS
233
Inljlectinn reports, IE Bulletins fc corresp nnd once
COO7140S37 Forwards IE Bulletin 80-13. "C
Bparg«rs " No written response required
KEPPLCR.J 0 Rug ion 3, Chicago, Office of th
ling in Core Spray
Director HO/OS/12
S007330SB9 Forwards IE Bulletin 90-16, "Potential Misapplication of
RoEemuunt Inc Models 1151 & 1153 Pressure Transmitters
W/EZitber A or D Output -Codes " Wntton response require*
IE Circular BO-lt also oncl No written response required
KEPPLEFJ,J G Region 3, Chicepo. Office of the Oire-ctor BO/Ob/37
In
•9Q07Q3006S Forwards IE Info Notice 00-33. "Breakdowns In Contamination
Control Programs " No written response required
KEPPLERjJ O Region 3. Chicago, Office of the Director BO/05X2fl
8007230275 Ac fc receipt of 8O06Q& ! tr informing NRC of steps, taken to
correct violations noted In It Insp Reft 5O-373/BO- 15
HEISHHANiFl F Region 3i Chicago. Reactor Operations Noclear Support
Branch BO/Q7/O3 lp
B007D10OBi Forwards IE Info Notice QO-23. "Loss nf Suction to Emergency
F««duatBT Pomps " Mo written response required
KEPPLER.J O Region 3, Chicago. Office of the Director 90/03/2"?
IP.
BO07170094 Forwards IE Insp Rept 3O-373/BO-24 on 800101-0507 & notice
of violation
KEPPLER.J 0 Region 3, Chicago, Office of the Director BO/O3/29
Spp
— 3007230261 Responds to NRC BOO'>09 Itr re violations notfrd in IE Insp
Rept SO-373/BQ-15 Corrective actions battery thargers have
been cleaned Units 1 ft S steam dryers require e. tensive mod
L Commonmial th Edisnti Co BC-/06/O6 Qpp
B0073506.38 Forwards response to IE Bulletin 80-06. "Eiami nation of
Containment Linor Penetration Molds " Dresdsn Unit S designs
wiH be reviewed ?< feasibility op performing rail iojrsph ic
e laminations mill be assea&ed before unit returned to svc
PEOPLF3.D L (.Q/timonujeal th Edison Co 90/07/09 7pp
— atX)7l700TO Notice of violation from insp on 800401-0309
» Raglan 3, Chicago. Office of the Director BO/ 05/36 lp
— MO717Q1Q3 IE Insp Rept SO-373/00-H4 on B00401-O309 NoneompliancB
no-bed, n« procedure provided for removing control rods from
reactor vessel on 000412. resul ting in potential damage to
two control rods ti drive mechanisms
UALKER.R D , BHEPLEYi 8 E , SPESSARD, R L Raginn 3, Chicago. Office
of the Director 80/03/2B Bpp
SOO732015& FDT-iuards IE Info Naticp BO-36. "Evaluation of Contractor
OA frograns " No written response required
KEPPLER,J.O Renion 3, Chicago, Office of the Director BO/OA/10
SQ07UO314 Forwards IE Bulletin SO-11, "Degradation of OUR Bcram
Dlicharae Vc-1 Copability " No written response required
KEPPLERiJ V ftegion 3, Chicago, Office of the Director 90/06/13
ip
BQO72BO709 Forwards IE Info Notice BO-as, "Prompt Reporting of Info in
AccorifancB W/10CFHSO 55<e) " No luritten response required
KEPPLER.J D Region 3, Chicago, Office of the Director QQ/OA/13
IP
6007100004 Forwards response to IE Bulletin QO-O9, "Mydramtttor Aitiratur
D»f Jcienclesi " No safety-related sys or componant at
Dreiden 2 I. 3 uses AH-9O or NH-9Q aories hydramotor
ac tuatora
PEOPLES, D L. Commonniealth Edison Co QO/Oi/16 3pp
0007530673 FDTuards IE Insp fiepts 50-373/BO-36 fc 50-374/80-li on
e<H>5Sa-29 No noncompliancB noted
FIORELLIiO. Raoion 3, Chicago, Reactor Construction fc Eng ineerlng
Support Branch 80/Oi/l? 2pp
— BOO7230700 IF Insp Repts 5O-373/BO-2i b 30-374/00-16 on B0053B-29 No
noncomplIdTice noted Major areas inspected moil in Unit 1
tup press ion pool, Maiding on dc power panels t, calibr of
41AO-volt It 4BO-volt switch gears
HEI8LER.J H , WILLIAMS, C C Region 3, Chicago, Office of the
Director GO/06/ IB 4pp
BOO70203B9 Forwards IE Circular BO-15, "Loss of Reactor Coolant Purap
Cooling tc Natural Circulation Co old own " No uirltten reeponve
Tequln d
KEPPLE41.J 0 Renion 3i Chicago. Office of the Director
If-
8007210383 Acli receipt oF 600606 itr informing NRC of steps taken to
correct violations noted in IE Insp R«pts 5O-373/BQ-2O 4
aO-37fl/00-13
FIORELLliO ffegion 3. Chicago, Reactor Cun at ruction ft Engineering
Support Branch HO/07/14 lp
— 6007210293 Respond* to. NRC H00126 Itr re violations noted in IE Insp
Ropts 30-373/SO-20 t< 3O-374/BO-13 Corrective actions design
control program deficiencies are subj of request for AGUE
use Urges roc unsideralicn of Item 3 Infraction
PECPLCS.D L Commonwealth Edison Co BO/06/O6 fapp
6007250167 Submits supplemental response to IE Bulletin HQ-O9,
"Ify Bramotor Actuator Deficienciee " Util revieu remains
Incomplete due to necessity of consulting equipment
suppliers ReEponso mill be submitted by 800827
PEOPLES, DL Commonwealth Edison CG HO/07/15 lp
0007390681 Ac I receipt oF S00635 Itr informing NRC of steps taKen to
correct violations noted in IT lusp Rept 30-373/30-24
KEPPLEfl.JG Fleoinn 3. Chicago. Office of tlie Director QO/O7/17
~aOO-7Bat)if.8B Responds to NRC BO0539 1 ti re violations noted in ]E Insp
Ript 30-.J73/HO-H4 Corrective actions unite formal equipment
-removal procedure
PEOPLES, D L Commor-ueal th Edison Co SO/Ofc/25 4pp
B007310530 Ack rereipt o-f BOOftO6 !. 07O7 1 trs Informing NRC of steps
taken to correct violations noted in IF Insp Rept
50-373/BO-15
HEI&MMAN'R P Region 3, Chicago, Reactor Op -B rations Nuclear Support
Branch BO/07/23 2pp
00O731OS33 Fortuards sup p lementol response' to NRC BO0509 Itr re
violations n-oted in IE Insp Rept fJO-373/BO-l 5 Corrective
actions util iifill perform visual insp of both dryer tt
separator prior to final installation in reactor Vessel
PEOPLES, D L Commnrwealtd Fdlson CD BO/O7/O7 5pp
3 Rcportable occurrences. LFRs ft
correspondence
BQD71 70314 Part 31 report ro i natal led Tetfi-91 1, Inc raatls containing 3K
Qfl which cannot be traced in original f urmulation Cause not
stated Unusnd matl has beon returned to vendor
Moticompliante Rept 9 end
ACERRA, L 3 TECH-SIL, Inc BO/OA/aO flpp
Forwards IE Insp Repts 30-373/BO-3B fc 50-374/BO-17 an
D<K)410-11 No noncompliance noted
FIOFELLIiS Region 3, Chicago. Ruactor Construction {< Ennineering
Support Branch 00/06/33 3pp
— -BOO7a30573 IE Insp Repts 50-373/BO-HH fc SO- 374/BO-I7 on HC-OA10-I1 Ho
ironcomp lianca noted Major areas inspected preservice insp
rtrocfldures. uork activities & nondestructive E lamination
tflit
DAN1ELBON, D. H , WARD, K. D Region 3, Chicago, Office of the
Director BO/06/20 9up
SO0717D43>0 Foruards IE Circular BO-14. "Radioactive Contamina-t ion of
Plant Dminerali jed Water Sys (< Resultant Internal
CantoHijiatiotl of Pprsannol " No written response required
KEPPLER.J 0 Region 3, Chicago, Office of the Director BO/Oi/S-1
lp
DOCKET 90-374 LAB/1LLE COUNTV STATION. UNIT 3
ft Apjil ication/construct l un stage documents J. i orrespondenc e
a007ai017£i Fnriuards [JRC evaluation of G£ r ept. NEDE-a401O-P !i Suppls.
l-3j "Technical B.uis for U-,e of Snuare-Boot-of-Sum-o f~
Squares (SR^S) Method for Combining Dynamic Loads Per Mark
II Plants " nvp I acceptable sutij to certain constraints
(1ATTSDN>n J DiviBion of Safety Technology BO/Oi,/a3 3pp
5007230001 Toi-uarils itatement of policy re rpqui rametits to be met fo
current DL <ippl icntlons, as derived from NWHEG-'OijSO l< found
In NURCG-Oi?fl
EISENHUT. 11 O Division of Lit easing BQ/0&/26 Spp
DOCKETED ITEMS
717017T3 Summary of 0QO&13 meeting in/Mart II lead plant applicant:
i definition a( T-quencher load spec following safety/
frlief valve actuation ViBitgraphs end
I'.T M Containment Systems Branch 90/06/27 4pp
BO&7O1OOB6 Forwards IE Info Notice HO-23. "LOBS of Suction to
FeeduatET Pumps " No urlttan response required
KEPPLER, J 0 Region 3, Chicago, Office of the Director 'BQ
IP
733O35-H Summary of B00613 meeting ui/Hark II lead plant applicants re
ethcuJnlngy proposed by applicants to d-efine T-quencher load
pec Following safety relief valve actuation tieia methodology
111 bv Applicable to all Mark II lead plants
J, T M eenerie Issues Branch 80/06/27 3PP
7330631 Summary of B006I2 meeting u/HarJi II owners group in
etrtasdaiMD re lead plant closure li long-term program Modt
tould be made to generic lead plant condensation
sclllatlon Ei chugging pool boundary loads Vieugraph s anc 1
NDERSCN.C J Generic Issues Branch 8O/O7/03 57pp
'150929 Toriiijirdi response to NflC BOO421 request For inPo re masonry
•II deEion Further review of masonry wall design is being
anifuctcd at La-Qallc to complete response to IE Bulletin
-)~1I Package nf 231 oversiie drauings ent 1
=DPLEH.D I- rommontUBatth Edison Co BO/07/OB 33pp
)Q 71 50537 Package of 331 concrete miiionry wall drawings to be recalled
Bt later da.te far microfilming
* Sargent & Lundg, Inc SO/07 /OS £31 pp
Forwards "Condensation Oscillation (CDI Load Data fur
isalle" i "Chugging Loads for Assessment of 4T CO Da*a "
(fits withheld (TDf IQCFRS 79O> «- available in Central File*
Cflmmonuealth Edison Co QD/07/L1
3pf
'SEO5JB Rosiporads to S00522 !, OAO-J Info raquests Info re DHR jet
iflp HolddobJii beam crocking uill b« submitted bij QOODI3 &
actor vessel under clad cracking info tig BOOSfOl
OPLEBjO L CaramoniUHalth Edison Co BO/07/17 Ip
0007320156 Forwards IE Info Notice 80-26. "Evaluation of Contra* tar
QA Programs " No written rosponso required
KEPPLER, J 0 Hegitui 3. Chicago, Office of the Plrsctor BO/OA/1O
B00714O311 Foruards IE Bulletin BO-14. "Daflradation of BMfl Scr«»
DlBChaTje Vol Capabilitij " No written retponae rcqulrad
KEPPLEft, J 0 Region 3. Chicago, Office of the Director BO/Oi/13
000720070"? Forwards IE Info Notice BO-2B, "Prompt Reporting of Info In
Accordance If/lOCFHSO 531 e I " No written TBSpannH roquirtd
KEPPUERi J 6 Region 3, Chicago, Office of thu Director BO/O6/I3
lp
0007100004 Forwards response to IE Bulletin 00-O9. "Hydrainotor Actuito'
Def IcIencloE. " No aaf ffty-related ays or component at
Dresden 3 d 3 usos AH-70 or NH-9O series hydramotor
actuators
PEOPLEB, D L Commonwealth Edl&on Co 80^06/16 3pp
at)07230ii93 Foruai-iJs IE Innp Repti 50-373/BO-26 «i 30-371/80-16 on
B00533-31? No sionconpl i ancfl noted
FIDnei-H,(? Region 3. Chicago, Reactor Construction & Engineering
Support Branch BO/06/19 2pp
— 8007330700 IE Inap Fteptu 50-373/00-36 >j SO-37-4/BO-16 on 80052H-29 MB
none amp 1 lance noted Major areas inspected mud in Unit 1
suppression p ool. uicl d ing on dc p Diner panels & calibr of
416O-volt J< 4QO-volt suiitch goars
NElSLEFtiJ H . WILLIAMS, C C Rcginn 3, ChicaBOi Office of the
Director BO/06/1B 4pP
ForciTdrds factllttj Grnergecicij procedures Table of contenta
eluded
LYOrtK.R H Con-mo nmieaJth Edison Co BO/O7/1B lp
07350") 33 EmB-roenEy procedures For Faci lltij, includlnj jeneral
abnormal proc eflureB, general abnormal inden «i operating
abnormal indsi
= CoHifflanueal trt Edisan Ca 7l?/O3/2a B2pp
Forwards initel foi faciiitij seneral procedures Indei uill
ipl g-eneral abnormal procedures ft operating abjiormal
ocidure Index jlrcod^ foruarded W/n end
-VOAK, R M CommQUuealth Edison Co 80/07/23 ip
10O033 ForiuaT-ds requost for addl infc- to complete revleiu of FSflR
1ESCQ, R I. rtsaistant Dircctar For Licensinj flO/07/33 3pp
B007030389 FormardB 1C Circular BO-IS. "Losa of Reactor Coolant Puop
Coaling f, Natural Circulation Cooldniun " No yritton renponta
required
HEPPLER.J 0 FlenioTi 3. Chicago, Office of the Director BO/0&/3O
Forwards IE Icup flepts 50-373/BO-2B a 50-374/BO-17 OH
BOOi.10-11 No mint omp I lance noted
FIGRELLI,Q Segidn 3, Chicago, Reactor Construction & Engineering
Support Branch BO/Ot/S3 2pp
—0007330273 IE Insp Ftcpta 30-373/BO-SB 8, 50-374/BO-17 on B00610-11 Ho
noncompl ianco noted Major areas inspected pr-Biervice Inap
procedures, uar k activities t. nondestructive examination
tust
DrtMIELSDH.D H , WARD, K D Region 3, Chicago. Office of the
D tree tor 90/06/20 Spp
icuritgr medital- cmcrgencij t, fire protection plans
HO317 Forward* safeggardu c ontingenc t plan amend Plan uithhel-d
if 10CFH2 790)
)F"LKB,D 1. Coitipnanuealth Edison To DO/06/27 I p
I .indicatory correspondence
110243 For wa iris Commiaiian 800S27 mom-orandiiin & order c oniti i
laians on UC3 7HOSOH petatjau F-or ret cmsid*ratlon of
(113 merfiorancTufli IT order UCa 771IO'5 petition *ought action
fire protHCtioii For eloctrical c-altles
.ENHUT, T> 0 Division oP Licsn^ing BO/06/39 B9pp
iltty Final Ba*etij
Report iFBAR) & amends
I7OB&7 ForuarilB HOO630 JiPFtdavit re H00613 distribution oF Amend 49
PBAH
ltd EdUan Co BO/06/27 Bpp
8007170430 Forwards IE (Tircular BO-11, "Had < ttacti vf Contamination of
Plant Demlneval lied Mater E3ijB li Resultant Internal
Contamination of Personnel " No written responBB reijuirtd
KEPPLER. J G Region 3. Chicago, Office of tho Director BO/Ofi/a*
tp
80072:30209 Forwards IE BulUtln 30-16, "Potential Misapplication of
ROEomount Inc Models 1131 fc 1153 pressure Transmitter!
H/Elthar A or D Output Codas " Written respotisa required
IE Circuliir BO-1.A also enc 1 Wo written response required
HEPPLER, J Q Region 3, Chicago. Office of th» Director BO/0&/27
HOO-7a30i3B Forwards roaponse to IE Bulletin BO-OB, "Eiamination of
Containment Linar Pttnotration Melds " T>re»oon Unit 1 designs
ulll be rovleued t Foas IB i 1 itij of performing radiograpliic
e laminations uill b? assessed before unit returned to tvc
PEOPLES, D L CommDHueal tf> Edison Co 80/O7/09 7pp
80O7210S-a3 Ach nocotpt of BOO606 1 tr informing RRC of steps taken to
correct violations notod In IE Insp fiepts 50-373/60-20 6
50-371 /BO- 13
FIOflELLI.O Region 3. Chicago. Rtiactor Construction d Engineering
Support Branch BO/07/14 lp
king in Core Spray
f the Director 60/05/J3
In Contamination
tor ao/05/BS
--H00721O292 Ruspnudb to NRC 8W421, 1 tr re violations noted in IE ln*j
Fiepts r50-37.1/HO-i!0 !i "JO-T/4/BO-J 1 TorrectivH dictions design
tontrol progrnm de f ic t cnc 1 es arp ^ubj oF Tequf«t For rtSME
use Urges rpcnr.!.iderat ion of Item J infraction-
P£OPLEf>. D L <.nmra»nwenltti Eri I '.on To
DOCKETED ITEMS
B0072S0167 Submits iupplomentii 1 i aspimse tn IE Bulletin 80-09.
"H^dramotur rtrluntor Uefic ienc ifit " Wtil TOVIDUI remains
Incomplete due tn necessity of cmiBultlny e<[uipmo!it
suppliers FJespmiBi' mill lie submittuil tuj GOf)Oa9
i 1) I- Comrnoniuual th Cdiunn fi> (1O/O7/15 Ifi
DQCKCr 30-379 NUCLFAH EIXAM1NAT ION HEALTDH
0 Inspection injiiirtii. It Bulletins tt i nn BBpondence
8Q0719Q3B1 roruai tin 1C (,lrcul«r UO-I1i "(loci lone t 1 va Contamination of
Plant Deralneriil i IEI! W.iber IIJB [. Ueeillt.int Internal
Cantamiiifl 1 1 un i>f Puruiinnul " Nn uiiitlun response renulred
EKeELKEN.il II flegion ")i Sun ["lancit.Lni Office uf tho Director
aO/Ou/21 IP
DOCKET 30-3/6 NOflTH rCIAST NUC PLANT
D AJjudicotonj r nrrpapnniloncn
F Security.- medical, omBrgency tt fire protection plans
8007010341 Forwards evaluation tine estimate to state Ii local offlciala
involved in smergBncii planning for area around facility ear
NRG 791326 rno.ue»t "Evaluation Time Estimate" «nc 1
A5HELL. D L Louisiana Power & Light Co 00/06/29 IOpp
—8007010343 "Evacuation Time Estimate -
» Louisiana Pouisr tt Light Co BO/O3/31
flipp
B0071O0163 Forisards Amend IO to FSAR Bad lolog i cal response plan hoi
been revised I. ui 1 1 be fnriuarded: upon final approval
ABWELL.D L Louisiana Pouer t, Light Co BD/Ot/87 ip
— 8007100166 Amend 10 to application for OL rt> up-gradail inirgtncy pl*na.
ASWELL-D L LouiiUna Pauer t< Light Co 60/04/27 2(ip-
— QOD710016B flmenfl JO to FBAR re upjraded •mirpencv plant
• Louisiana Power t. Light Co SO/06/3O 177pp
BO[>70101in MomoTandum In rucpnriBU to ftBLAII HOOftOI order r» abiento nf
authority tn iiivaluntar i 1» iliamian Tl1 opji 1 i cut! on due to
abandonnmn t u P inniit Isoue munt bo runiandcd to A6L1) to
inquire into Poi to W/appBiirancu notice t CerliPlcoto nf Bvc
RGlSiL J Hofli ln« Br,ini.li 3 LC13UY, II P Antitruot Division
90/06/37 I9pp
B007030601 Momlirnnilum in ruspopiao to ABLAI1 OUOA04 iirilwr Interl ocutorg
rn-iftu af rtf3L3) nnlor ilDiiijlny 0 Ftfriius [intiHon to dlamlso
application not unrrnntDd unlocs lugal hnundiirleo are not
tiplorod W/rul'ti F Irato of Svt
F'nurto Him LTloctrll I'ouinr Authoilty AXELfirtD, H
li-ripi.im.m.llola, Aaolrai! t. Toll HO/O6/H7 21pp
nrdui- qrantlng DptiDii tar applicant to respond to NftC 0006H7
memorandum in Cl' procuori inn< I"J OO071H
1 1 SHOP i C J Atomic Bofotg and Licensing Appeal I'onel HO/Oo/3O
Q007ioOSai Hnlinri suoHng option tn respond to applicant by QOODOB. if
applicant ranponitfi to MltC H()06c!7 mnnnir find urn by 0007181 ro
ASLAH OOOblO ot dor Cort 1 Picn to of Gvc nnc I
FERHO!J,0 CitiioriB for tlio Coi>Btfrvatl on of1 Natural fiDBoiircnt. Inc
1 p
S007330BJS RecpDnnn to NriC n006E/ mBmornndiim, in roply to AEJLAB D00630
»nter In terl uriitnry, ruvlnui of AfJLR ordor ro dinmionnl of CP
application i4)/» honrlnu on lioalllii onfotij t> environ is not
uarrantvd Certificate oP Bvc nncl
AXELRAD-M. I'uorto Iliun ElPCtrit Pomor Authoritg, AXGLRAD, M
Lnuenstoln,Ncui(niiii,IIolf,, A.olrad Ic lull £)0/O7/fcO llpp
00072307^1 Momorandiim in reanonBt' ID rtSLAB BOO/401 order re validitg of
ASLD D00!)29 ordiii ilonijlng |iBtiti(in fcfl intervonu Urge*
rivarttal af A'jin urdcr t> inatilulion of hDnrlnan
Cel-tlFicntn of Dvc oncl
FEHNns.B Cltiionn for the Cnnnorvnl ion of Naturol HDHourcus. Inc
30/07/1D 1 lp|i
BQ07SH0373 Foruards i-SBponte to NffC BOO&09 conm»nti t i-Bvliod papal to
safeguards contingency plan Response tt ravitftd plgea
withhold fr*f 10CFR2 77O)
ASUELL.D L Louisiana Pautr & Light Co BO/O7J 1 3 Ip
D007H50399 FoTWarda A*n»ll to OrlmBC B00633 1 tr
A5UELL.D L Louisiana Pou&r & Light Co 50/07721 Ip
& Adjudicatovg correspondence
B007310S43 Forwards Commission S&0327 nimorandun 4 order centalntng
deciBinno on UCS 7B0302 petition for rcconsider-atl on of
7B0413 memorandum & order DCS 771104 petition loirght action
re fire protection for electrical cables,
EISENHUT, DO Division of Licencing SO/Oi/25 B9pp
K Utility Final Safety Analysis Report <FSAR> & anendi
B007100163 FoTuards Ams-nd iO to FSAR Radiological response plin hai
ho en revised bulll be foruiardeit upon final approval.
ASWELL.D L Louisiana Power & Light Co BO/06/27 Ip
— 8007100166 Amend 10 to application for DL re upgraded »«i«rfl«ncy plan.
ASWELL.D L Louisiana Pouer It Light CD BOJObfS7 2pp.
— 800710016Q Amend IO to FBAR re upgraded emergency plan*
« Louisiana Poucr St Light Co 30/O6/3O 177pp
800716055^ Certifies «vc nf Amend ID to- FSAR on B00710j upon partial in
proceeding Related correspondence
* Louiolana Poijier !c Light CD BO/07/10 Ip
0007160616 Certifies ivc of Amend 10 to FSAR on BQ0710 ,
KAVANAUOH.P H Louisiana Pouer & Light Co BO/07/1O Ip
DOCKET 30-37U CAOHt.!! NIH.LFATI HTATHIN
A ApplJca t lon/t nn»l rut linn Btfl!)o doctimBnl i (• rorreapondenee
B007^goi7fl NotifiiJitlon of OOOFIOU meetinn di/rcprpmmtjiti ves from Murk
II owners group in Chicago. IL to discuss load MOP* II plants
chugging t* C/D load apace
ANDEHBDN,t: OHnai-U lotuus Itranth Iin/0//Hn 3pp
DOCKET 50 303 WATrfl(-OHO OE.NPiATIN6 8TArjOH, UNIT 3
A Appliiotlon/cimslruc tlon Btngo ilocumcnts d torrespundente
30070803111 Confirms disrunBions u/NRC re T eoilrapti on of work 6«
Bubcontrjclor.NI'iCli Work moy ripsgmi- in slop work arua of A fc
B stop4 (|)i|>n i niiti aintt ) instill luti on( p and Ing completion of
ranalninj NRC 800'1O9 prerequi E! til»
SEVFR1T! H. V Hitginn 1. HallQB! Offiru of the Director 80/06/11
IP
ao07S30001 FnrmortH fitnUmnnt of policy ro roquiremonts to be met for
curront OL appl ic.itimic. AS derived from MUHEO-Ofo/iO J. Pound
In NUREO-06-I4
EIBENHUT, 0 (I DtviBion of Licnnslng OO/Ofc/I'ft 2pp
Q Inspection reports. IE Bulletins & corresponiltnee
6007250323 Foruards IE Info Motlce 00-12, "In»trun«nt Failure C«u»»»
Opening of ROW & Block Valve " Ho specific action or
response necenarij
BEVFRITiK V Region 4, Dallas, Office of the Director BO/03/31,
IP
BQ0724Q310 Forwards IE Info Notice B0-31i "Anchorage tt Support of
Eafoty-Hela ted Elettrital Equipment " No urlttsn response
required
TiK V Region 4. Balla-Si Office of the Director 80/D9/1&,
B007110061 Forwards IE Insp Hept 50-382/BO-09 or a004Bl-a5 * nntien*
of violation d deviation
SEIDLE.H C Rejion 4, Dallaaj Reactni- Construction ii Enginearlno
Bupport Branch BO/OS/S1 SPP
— BOO71IOQ63 Notice of vinlatlon from insp on BO04H1-E5
e Rcflion 4, Dallas. Office of the Director BO/05/20 3pp
— B0071IOQ70 Notice of deviation from insp on B00421-25
a Region 4, Dallas, Office of the Director. BO/05/20 Ip
B0070S0179 RovHOTiiU lo Nflf roo.ucBtu foi flil
provide amoiirf In F3AI1 on SOQ731
I. Louisiana Pouor t< U«ght Co
l Infa l-iconine uill
BO/OV/03 Ip
236
DOCKETED ITEMS
— 6OO7110074 IE Imp Rept 30-303/60-07 on 800421-23 Noncomp It anc e noted
f«ilur* to follow procedures for documentation aF Q/i
pro(r«o.> Paragraph 3 S 1
BEACH.A B, . HALL, R E , CROSSMflN, U A Region 4i Dallas, Reactor
Ccnitruttlon fc Engin«»rlne Support Branch 80/05/SO Spp
B007I706BO Forwards IE Circuld.
Plant Demineralned Water Sijs
Contamination of Personnel " f-
SEYFWIT, K V Region 4, Dallas
>P
0-14. "Radinartive rontaniiiiat ion of
Resultant Internal
nil i t ten response required
Office nf the Dnector 8O/06/24
K»7020aiJ Forwards IE Info Notice 80-23. "Breakdowns In Contain mat i on
Control Prog-TDM* " No written response required1
BEYPFtlTiK V Region 4, Dallas, Office of the Director BO/05/3B
8OO714O436 Forwards IE Insp Rept 30-3B2/SO-O7 on BQ04O2-O4, 09-i 1 !, OS03
& untie* of violation
SEIDLE. H, C Region 4, Dal} at- Reactor Construction fc Engineering
Support Branch, BO/O9/2B 3pp
— BOO? 140441 Notice of violation from insp on BOO403-O4. 09-1 1 b 0503
» Region 4. Dallas Office of the Birettor BO/Q3/2B Ip
— BOQ7MO4*? IE Imp R«pt 30-393/80-07 on BOO-tQ2-04j O9-1 1 (. O502
Noncoinjil lance notod failure to verify conference u/
doeUMantid d-rauilno,*
STEHARTiR C Region 4i Dallas- Offico of tbtt Director.
TOK.IHSQN.0 P , HALL, R E Region 4, Dallas, Reactor Construction d
Engineering Support Branch BO/05/2B 3pp
B00721O34£ Forwards IE Circular BO- 13, "Grid Strap Damage in
Hutinjjtiouia Fu»l Assemblies " No written response required
BEYFHITjK V Region 4. Dallas, Office of the Director' BQ/Q5./aa
8O070IOOHO Forwards IE Info Notice BO-23. "Loss of Suction to
F*aifwlt>r Pirnpi. " Mo written rosjianse required
SeYFRIT,K,V R«uion 4j Dallas, Office of the Oirectup
BW71QQ4S9 Risjiondi to IE Bulletin BO-OS as Jippticable to tanks that
(ID lit rad inactive liquid or ga*es All lou preEsura tanks
c-ontalnin) railloactive liquids or gases either designed for
full Vacuum or to prevent vacuum in tanks
L. D L Louisiana Poumr t< Lioht CD 90/OA/O9 3pp
B007230369 Forwards IE Bulletin (10-16, "Po tuntjal Ml sapp 1 1 c at ion of
Hosentount 'nc Models 1151 !< 1 1 D3 Prnssurc Ti-ansmi tters
U/Eithar ft or D Output Code?, " Uiittpn i DSponse required
IE Circular BO-Ifi also encl No uirittsn rcsponaH retjuired
SEVFRIT.K V Region 1, Dallas. Office nf the Director SO/OA/27
IP
8007390433 Ac fc receipt Of BOOiai) !tr informing NF1C of stepe tafcen tP
correct violations noted in IE Insp Rept SO-3S2/SO-09
BEIDLE.H C Region 4, Dallas. Reactor Construction ', Engineering
Support Branch BO/O7/OQ Ip
--B007390439 Responds to NRC 800521 Itr re violations npted in IE Insp
Rept 30-332/00-07 Corrective acticins NI&CD housch eep in(j ic
insp procedures revifleil for clarity
ASWELL, D L Louisiana Pnmer & Light To 80/06/30 5pp
8007300391 Act, receipt of B00630 1 IT informing NRC of staps taken to
correct violations noted in IE Insp Ropt 50-30S/BO-07
SEIDLEiN C Region 4. DallaE( He.ictor Construction ;, Engineering
Support Branch BO/07/00 Ip
— BOQ73QQ395 Responds to NRC BO052Q Itr le violations noted in IE Insp
Hept 50-382/BO-07 Corrective sctiuns D atop repairs to be
accomplished by grinding ueld defects CD Bound metal !i
visually inspecting results
ASHELL.D L Louisiana Pouer E. Light Co BO/Oi/30 app
3 Reportable occurrBnceSi LERs S related correspondence
0007290'1'10 Part 21 rept re potential interference in full function of
Borgcn-Paltfrson strut ai>Hembly y/Pntific Scientific Cn
mechanical shocii <irrei,tar Lusbinriers will be notified nf
affected items & recommended solution
DECKBTED.M F Dergen-PattBrsnn Pipe Support Corp SO/06/2O 5pp
8O07S2OI13 Forwurdt IE Info Notice BO -24, "Evaluation of Contractor
QA Program! " No writtvn response required
BEVFRrT.K.V RHgion A, Dallas, Office of the Director SO/Oi/lO
JOO7I&0327 Foruard* IE Info Notice 80-27. "Degradation of ftoacto-r
Coolant Pump Studs " No specific action or response
rrtuir'd
SEYFRIT, K V ftagion 4. Dallas- OffifB of the Diroctor 00/06/11
B007010319 Requeits that completion d«tc for submitting Final
deficiency rept re procedural Ei performance d-ofic i enc i ps in
Ultrasonic testing of structural uelds performed by
Industrial Engineering Works, be ei tended until 80Q7C31
ASHELL.D L Louisiana Power t. Light Co 60/O6/?7 Ip
0007030397 rnruiarrfs final Significant Const Deficiency Hopt 16 re
Control element drive mechanism gmdo cunes off-set
ASHQ.L,D L Louisiana power t. Light Lo BO/O6/27 Ip
O0729DQAB ForuiflrdB IE Info Notice BO-2B, "Prompt Roportinfl of Infa in
Accardanc* H/10CFR50 35(e), " No lurittnn responso required
BEVFF1IT.K V Peuion 4, Bellas, Officn of the Director HO/O&/13
Ip.
— B007020flQ5 Final 9igniPfcant Ctinst Di-f U i ency Rept 16 re control
element drive mgrhanium guide Loner f< penetration assemhliee
Interface OFff.et tonditian elists uilnch con lit produce
iliterf eronco on control ajesemBly shaft
* Louisiana Pouier S< Light CD SO/06/27 2pp
007J5O4I7 BuSml** interim reply to IF. Bulletin 90-07 re Hydro mot or
actuator dificlejic IBB ITT General Controls AM-90 A WH-*H>
ivrlvoi hvilramotor actuators ulil be used1 in «af itij -ralatml
«yt T»»t rept to be completed during at of 00-0621
ABHELLiD L Louiaiana Power tt Light Co BO/Ofi/17 Ip
»7a4OO*5 Foi-uirdB IE Circular BO-15, "Loss of Reactor Coolant Pump
Coaling b Natural circulation Conldoun " No written rBaponsB
rmuJred
SEVFHTT, K V RBjlon A. Dallas, DffHe of the Director 80/06/20
8007080231 Forwards interim rept of Significant Cnnst Deficiency 17 re
base metal defects in main steam *< fceduoter containment
penetration anchors
ASWELL.D L Louisiana Power t< Lighf Co HO/07/03 Ip
— B007OB0239 Interim icpt of Significant Const Definency 17 re base
metal defects in main steam & freiluater containment
penetration nnclioi s Evaluation undnriuay to establish repair
techniques Final rept will be Furiguriled by 810301
CUNICH-J , MILHI8ER.P. J , HflDT. J LouiBiana Puuer t< Light Co
BOV07/03 3pn
KI7500144 FariUjrrd* !E Inap Rept BO-3B3/BO-10 on 890602-05 S notJc* of
BEIDLE.M C Region -1, Hallas. Reactor Construction & Engineering
Support Branch SO/RA/20 Spp
DOCKET 90-3B7 SUSOUEHflNNA *3TCAH tLECTRlC 5TAT3DN, UNIT 1
A Application/construction stape dntumentfi * c ovrespondence
BO07ffaOMfi Hotict of vinlation from insp on B0040B-09
« Rnginn 4, Dallas. OPPice nf the Director BO/Oft/lB Bff
BCXD72eoi53 IE Insp Bept 50-392/80-10 on 00060H-OS Noncomp 1 tape e riDte
Pallura to foMou- prnnifur"* for control of ittaign mods S<
fall urn to control use at callbr tool ulthln neossaru
limits. M
CBOBSHAN, W A R»gion 4, Dallas, OffitB of tno Director
TAPIA, J 1 . TDML1NSQN.D P Reelan 4, Pallas. Reactor Conitruc tion
fc Eiultmaring Suppoi-t Branch BO/06/1B Sop
0007030339 Notification Qf tlOO/OP^meet ing w/BWR licensing revieui group
in Be-thesda, HD to disc-use cnn^nnsi's position on reactor
tvr bJdg open insue
M1LSQN.J N Licenilng Drancfi 1 BO/OA/IB 9pp
8007010297 Summary of 00061,3 meeting ui/ut 1 1 9, KMC, Inc, SE. 0B<:htel , SMJ d
Sargent fc Lundy in Hethesdrf, MD re consensus positions on
reactor avc blifg !< isiilation (.Doling sye blrtg open issues
from La 9alle doctet Status i ep to end
WILSDW.J N Assistant Director For Licensing BO/OA/19 16pp
DOCKETED ITEMS
237
6WO721CU76 Forwards NHC evaluation of GE rop t> NEDC- 3-10 10-P & Huppls
l-a. "Technical Basis for Use <) f •Situnr e-Hnot-of-Sium-of-
eu,uar«i (SRSS) Method FOT Combining Dynnmic LnadE For Mark
II Plants " Ropt acceptable sub j to rert.ilri <: on strain Is
HATTEWJ, K J Division of Safety Technology BO/Ofi/aS 3jip
eOO7090391 Notification of BOO7H-17 meet ing u/wtil.CE t, Dechtel in
BithBsda.MD to revieu open itcma for Facility FSAH
generated by NIIC Mechanical Enuineerlni) [lr.-ini.ti
M Licensing Branch I SO/Od/2/j 5pp
BQO7.23QOO 1 Foruards statement of policy re re^u ' rnmentu to he mat for
currant OL app I icntions, as derived From NUH£G-06iO (• fnund
in NlBEQ-0694
G Division of Lirenoing BO/Oi/36 3pp
HOO7Q9037S Forwards request for addl info re reactor BIJB
VQUNOBLOOa, B J LIconaing Brant h 1 BO/06/27 Hpji
&QQ717Q339 Notification of rescheduling of (]OtJ7O3 mooting u/BWn
ticimlng review group in Bcthetila, -MB in discuss consensus
p tuition* on Roactor S«a DrtincN open issuoc Mooting
rBBchBdul-ed Far 000707
HILBONiJN Asflislnnt Director for Licensing BO/07/03 lp
— BQO7I703fl7 Notification »f B00732 in-tin ting u/BWfl licensing review group
in &Bth«s<taiMD to discuss TMI IEBUBB toquirod for OL
i isuante
M rtosiHtant Director for Licensing 00/07/03 lp
-- SOO7170391 Notification of F1007H4 niBPting u/nWR licensing review group
tn Bnthcsda, MD to introduce DUII lifL'rlsing rovioiu group tt
prttnnt consonsuB positions for Power iiyn Branch. Containment
BIS Branch & Enuipmenl Oual i Plralion Drone h
WILSOM.J M ftBsistnnt Dtret tor for Llcciinliig 00/07/03 9pp
£KHJ7 330631 Bummori; of 800612 meeting ui/M^rk II nuiner's group in
Bnthttda.MD ro lead plant closure !( lonn-term pi ngrnm Mod s
• houltj be ma do to generic lead plant cimdcnuatlun
a»< i \ lation t< chugging pnol dounilanj Inads Vicuigrflpht oncl
ANPERBDN.C J fleneric IDSIIBS Uranch BO/07/O3 S7p p
OOO7S3O133 Natlflcjition of !t007t>'i meeting w/autt - LLcetiBing Hevicui
Oroup in Dothunridi Ml) to discuss conrensuo positions i>f
DVffi - LlCQn'Elng Dovieu Ornu|> on ICSH open IOSUOB
MILGDN.J N Licensing Uranch 1 BO/O^/li lOpp
BOO7BDOHa9 Comments on BOO711-16 meotlrifl w/NRC in liff IhesifB. MD to
r-aealve Issujin & nnsuier aios-tlonE on rsffi Soctiona 3 i-10
Dp«n iiiues uero rmolv-od It meeting wt pruductivff Liconiinn
«»nag*r» ahauld hovu Input in ai'loLtina mooting location
CUflTIBiN M Ponnoylvanin Poaier R l.inht Co 00/07/10 2pp
DOO739DO1V Advison that withholding affidavit (ior lOCrRS 790 must 1)8
• u-bml tt*rf tn support 000609 rnquest ro Rtvlsion 3 to doainn
**-B*niB*nt ropt Affidavit must be tranami ttod wltdln 30
da^v
VOUNflBLODD. D J Licansing Dr-inch 1 HO/07/21 Sfp
meal meetings
0 rtdjudicatoi ij currespandencB
8007010276 Responds to 000607 Itr Transcripts oF NRC tecli
w/appl marts are not dvailablc due t« unofficial aspect
bUfnmarisa of ranetintts availabln in LPDRs Future Itrs on
behalf of in lervenot-t should be sent to NRC counsel
CUTCHIN.J M Hearing Dranch 3 BO/06/16 lp
B007010B73 For uards Contusion "Statement of Interim ooS . cy on Nuclear
Pouer Plant Attideiit Con-a i d era t i ons under HEPA of !96=pj "
flublishcd in S0061J FFi Commission decision, CLI-BO-QB & ASLAB
•docision,ALAn-5S/ end H/o attachment*
CUTCHIN.J M Hearing Branch 3 BO/O6/17 2pn
8007310243 Forwards Commission BOO^37 mrmorandum I, order- con-taining
decisions on "JCS 78O503 petition For rec on? m erati on of
780-113 memorandum !. order t)CS 77110-1 petition sought action
re fue jirotettion for eJoctrical cableE
EISENHUT.D 0 Di vision of Licensing 30/06/35 B9pp
000715070-? rtdwites that FES i* scheduled to be issued in Dec 1980.
safety evaluation in Feb 1981 !< safety evaluation suppl in
Hay 19H1 Further significant changes ut I] be provided per
NRC 79012*-3I pruhearing cammi tment, i f necessarii
CUTCHIN.J M Hcarinq Branch 3 QO/O7/K) 3jip
V. Utility Final linfetij Analysis Report (FEAR) *, amends
00070BO210 Forwards narled-up copy of FSAfl, Silbsec ti on 3 92 & Table
3 "7-33, eorr set I'll to aorep w/prcoper a tional It startup tests
program Changes uill lie discussed at draft EER meeting
durlnj ut of g(1071fl
CURTIS. N U Pentisi]lvania Power !i Light Co 80/O7/03 llpp
00073^0131 Foriiicsrds Amend 33 to application For OL consisting of
Revision 16 to FEAR
CURTIS, N W Pennsylvania Pouier fc Light Co BO/07/11 lp
--fT00721Ot4S Amend 3? tn application for OL consisting of Revision 16 to
FSAI!
CURTIS,. N U Pennsylvania Punier !. Light Co BO/O7/14 lp
—B0073101-13 Revision 16 to rSAfl
* PEnnaLj-lvdTii.i I'ouer t. Light Co GO/07' 14 AQQpp
0 Inspection imports, IE Sulletms Si c-orresponideni: e
HOO7 1 10466 Foruarifs IE Dullstin BO-13, "Crscliina in Core Spray
Spargers " No written response required
OHIER.E H Fleglon 1. Philadelphia. OFfice of the Director
BO/05/J? lp
000717Qe37 ForuiaPils IE Insp Repts 50-3B7/430- O7 !. 50-3B9/BO-O3 on
BOC4SI-2"! No noncomp 1 lance noted
CARLSON, R T Region ], Philadelphia Reactor Construction &
Engineering Sujipatt Brancfi SO/O5/3S Spp
HOO7a30175 MotiFitation of BOOQ09 meoblna u/repreEentat ivoa from Hark
II ounera gruup In Ch Itogo. I L to- itiacuns laail hj.irfc II plant*
chugging t< C/O loaJ specs
ANDERSON, C Oeticric IOSUBB Branch 00/07/23 3pp
NotifUittion of 80DB2I meeting ui/utll in Dethssda. MD to
dl*cuKt runpontae to Kaactor Siji Rranch ituoations
BTARKiK.H UcBnsinn. Branch 1 Q0/07/a3 3pp
F". G*cupltiji madicali emnrgnncy d Pii>t- pi-otEctlnrh plans
--800717O6-13 IE Itisp Repts 30-3B7/BO-0/ t> 50-3SH/BO-O5 on 600431-34 No
noncoinji liflnee noted Mnjcir areas inspettEd site audit program
!< outstanding Items
DUHR,J P Res ion 1, Phi lad etph is. Office of the Direttai-
TRIPPiLE Region 1, Phi latfelph ia, Reactor Canat ruction (i
Engineering Support Branch 8Q/Q5/23 3pp
a007O1026a ForuBrris IE Info Nutice 80-23, 'Loss oF Sucttoii to Emergency
Foediuafcor Pumps " No written response rei|Ulred
QI1IER.Q M Region 1. Philadelphia, Office of the Director
BO/05/29 If.
BOQ723O325 Summary of B0061/h moeting tu/util in DothoEds.HD to raceiv?
Applicant quettiona ro technical cupport ctr t* emuTsencij
Uf.*ration* Pncilitij Applicant uiishna to clarify
Interpretation of certain NRC rDquiremonts
STARK. R M Licensing Branch 1 SO/07/10 4pp
•BOO7S2O441 roruardi "Study flcpt fur Suatiuuhanna Steam Electric Station
tfas* Nntif i c Qlion i, Evacuation," Part li prepared bg AN
Vorhte* & Aasociotes Hept in rcHprinne tn NHC S0070H request
CURTIS, H W PBnnsijIvflnia Pouier t< Light Co BO/07/ 17 IP
— &DO7B2044H "Study flept for ausnuohanna Strum Electric Station Man
Notification & Evacuation." Part 1
» PRO Planning b Economies, Alan M VoorhoeB d Aasociatas Div
EW/07/17 87pp
Fnrioarda !E Tnsp Rents 30-397/30-11 It 50-3BB/BO-07 on
800313-16 No nnncompliance tiuted
CflSLSDM. R T Region 1. Phi ladelph 13, Reactor Construction &
Engineering Support Branch SO/06/03 5pp
--60(J717OEt>7 IE 'nsp Repts 30-387/BO-l 1 S. '50-3BB/ 80-07 on SC0513-16 Nn
noncompliance noted Major areas inspected alts activities t,
reviau of MRC insp status
DURft. J P Ifegifln 1, Philadelphia, Office of the Diractor
MCQiMfQHY. R W Region 1. Philadelphia- Reactor Construe tion t
Engineering "junport Brflnch BO/OA/02 2pp
B00721060i> forwarils IE Info Notice FIO-26, 'Evaluation of Contractor
OA Programs " Ho written response required
CRIER, B H Rcaicm J- Ph i lade Jphla. Of-Fic* oF the Dirsctor
238
DOCKETED ITEMS
B0071403B7 Foruards IE Bulletin SO-14. "Degradation of GWH Sc
Discharge Vol Capability " No written respunse required
CRIED, S H Region 1, Philadelphia, Office of the Director
80/06/13 Ip
8007310043 Ac fc receipt of B00613 interim d«f it ioncY rapt re:
unaulhori iod weld on reactor pressure venal
CAHLSON.O T Region I. Philadelphia. Reactor Operation* Hilda or
Support Branch BO/06/3& Ip
8007260612 Forwards IE Info Notice BQ-2B "Prompt Reportinj of Info in
Accordance U/10CFR50 53[e) " No written response required
GfllER. B H Region 1. Philadelphia. Office of the Director
BO/06/ 1 3 Ip
S007030513 Foruarfls IE Circular BO-15, "Loss of Heattar Coolant Pump
Coaling & Natural Circulation Cooldoun " No written response
required
CRIER, B H Regmn 1. Philadelphia. Office of the Director
BO/06/2Q lp
H007160733 Foruards IE Circular BO-14. "Radioactive Contamination of
Plant Deminernlned Water Sys I, Resultant Internal
Contamination of Personnel " No written response required
QRI6R. B H Region I. Philadelphia. Office of the Director
80/06/24 lp
80073ID271 Forwards IE Info Notice 30-24, "Lou Level Raduaste Burial
Criteria " No written response required
CRIER.ff H Region 1 Philadelphia. Office of the Director
BO/06/2 3 I p
8007210334 flcl receipt at 8OO613 Itr informinfl NRC of steps ta»en to
correct violations noted in IE Insp Repta 50-397/BO-01 &
so-aaa/ao-oi
CARLSON.H T Region I, Phi laJe] phia. Reactor Construction fc
Engineering Support Branch HO/06/27 lp
— 8007210341 Responds to NRC 600514 Itr re violations noted in IE Insp
fiepts SO-3B7/BO-01 t, 5O-3BB/BO-01 Corrective actions all
spacr heaters in motor control ctrs identi f led. enargi ied &
checked periodically
BABOL.A R Pennsylvania Power t. Light Co BO/06/13 3pp
—6007310343 Forwards IE Insp Rents 5Q-387/SO-0! t 50-3BB/BO-01 on
BOOiai-0201 J, 0211-39 t< notice of violation
CARLSON.R T Region 1. Philadelphia, Reactor Construction &
Engineering Support Branch BO/03/14 2pp
80072103-49 Notice of violation from insp on BOOI21-0201 i, 0211-39
» fieoion 1. Philadelphia. Office of the Director BO/04/09 3pp
— B0072I0335 IE Insp Repts 50-387/30-01 (, 50-393/00-01 on H0012I-02O1 fc
O211-21? Noncompltance noted failure to follow approved
procedures during preventive maint J, to establish proper
test program for perforraance of hydrostatic testing
OALLO,R H , RHDADS.6 G Region 1. Philadelphia. Office of the
Director MCCAUGHY, R H Region 1. Philadelphia. Reactor
Construction t, Engineering Support Branch BO/04/09 IBpp
ou pca
Ros.mount Inc Model* 1191 fc U52 Pressure Transmitters
"/Either A or D Output Codes " Written response renuired
».™rS"i"r 2°"14 al" e"Cl N° W"™ "spons. required
SoJo6/a7 Sf'f3l0n l' PMUlielPhia' 0»*« »' tht Director
B007180337 Advises that ASME Code Cases N-234 (, N-235 have been
approved for use in reactor pressure vessel nfncof\ttf <
progran e p
VDUNOBLDQD. B J Licensing Branch 1 80/06/28 2p,
.*n.l! ihai" e°~?7 rB;ulr'em"'ts ». to provide commitment to
actions ft * long-term solution is approved Any short-term
YOUNCBLOOO.B J Licensing Branch 1 80/OA/3O 2pp
?..?!!!l!*"!_""Ir*ne'*'_LE^s * "lated correspondence
et>?l\l»%l M r"rPt 2* 800S13 lnterlm «"Hci.nc« rept re piir
soienoia valve classification Resolution of deficiency
nn J< Ph"adB'P",a, Office of the Director
BO07080313 Supplemental deficiency rept re Pacific chvtk velvoo
Problams w/check valve operation in Unit 1 core *pray putaf
discharge vertical pipe run will necessitate rework of
bonnet stops Final rept uill fae provided by Sept 1980
CURTIS, N, W Pennsylvania Power S. Light Co BO/07/03, 3pp
B007140197 Interim deficiency rept re Anchor-Darl inu valva yufco-fl. Cracfci
discovered m four radii at yoke mounting flange/yoke
vortical section interface on Anchor-Darling valve* in
residual heat removal BUS Final rept uill be forwarded
CUflTIS. N W Pennsylvania Pouinr b Light Co HO/07/07 3pp
B00714O340 Interim deficiency ropt re Anchor-Darling, valva yoke*. Crack*
discovered in four rodii at (joke mounting fl*nga/uok»
vertical section interface on Anchor- Darl ing valve* in
residual heat removal sys Final rept mill be forwarded,
CURTIB.N H Pennsylvania Power It LiBht Co BO/07/07 3pp
8007140340 Interim deficiency rept per IOCFR3O 33<B> & Part 21 r»
craclta in four radii at yoke mounting fl*nge/yok» vertical
section interface on Anchor-Darling valves in RHR *y» Finn!
rept date uill be provided after further review
CURTIB.N W Pennsylvania Power It Light Co HO/07/07 3pp.
B007I4Q170 Forwards final deficiency rept re insulation d*««ge t,
deficient pin crimps in poiuer generation control complen/
advanced control room panel connectors
CURTIS, N W Pennsylvania Power tc Liflht Co. BO/07/OB Sff
--0007140179 Final deficiency rept re insulation dai»ao> *. deficient pin
crimps in pouer generation control tomplen/advnnced control
room panel connectors, Cause unidentified Visual ln«p fc pull
test Initiated on Unit 1,
« Pennsylvania Power * Light Co 80/07/OB Bpp
S007iao434 Interim rept.par 10CFR30 35(e) I, Part 31, r. pr •mature frl«»
out fc drifting set points for pneumatic time delay relays
associated u/Agastat 7000 & QE CR SS20 relayi Dochtel &
util analyzing safety impact
CURTIS.N W Pennsylvania Pouer & Light Co BO/07/il 3pp
0007390363 Ack receipt of BOOili final deficiency rtpt re Linitorau*
motor operated valve stem nut staking
CARLSQN.R T Region 1, Philadelphia. Reactor Conttruetion I
Engineering Support Qranch BO/07/11 Ip
B0071B02B2 Advises that B00133 Itr describing pot.ntial RO r. cop.1
structural floor beams determined not reportable under
10CFR50 35£e)
CURTIS, N W Pennsylvania Pouter Si Light Co 80/07/14. Sff,
9007180364 Potential deficiency rept re coped structural floor be*«i
Based on results of field Insp t finite .l.fflent an-ly.i,.
conditions noted are nonconforming t, are therefore not
cnSrr^'S PB« IOCFRS3(«I B""fl PTOcedur.. revised
CURTIS, N H Pennsylvania Power t, Light Co BO/07/14 3pp.
S0078304S7 Interim deficiency rept re status of Anchor Oarllnn V4.lv.
«okes AE has advised final rept on cracked yok« on Anchor
Darling valves ulll be available in AuD 19BO Final rent -111
be foruiardud durina Sept 19BO H
CUfiTlS.NH Pennsulvanio Pouer (, Light Co 80/07/21 Ip.
F!naiiDaf":ienl:'' ?CAR ^"'P" 10CFHOO 35U) I Part fit,*, OC
lacking propsr slope Caused by unclear denign
*,,*?^* faUur" rtl1 -"ected drawing, U"j b«
,Ur"t 1 3H"buI1t» completed by BQIB3O.
H Pennaylvania Pouer (, Light Co. BO/07/K1. 4pp
B007aB0650 Final deficiency rept re improper sloping of OE piping b
tubing Bechtel Nonconf ormancB Rept BBO7 lists 41 "mall pip.
installations to OE equipment that do not meet min ilop.
r^ulrement Revised acceptance criteria developed
» Pennsylvania Power & Light Co BO/07/H1 4pp.
i.M W Ponnsylvania Pouer & Light Co BO/07/H3,
>072?0623 Supplements *• updates projected com
Corp"ilinErov,deP° SUpP°t't dltstnn Drawings B
a»
c
completion Oat, of
' er
Har
19BI
,-,-_ -,m * * *,-•. j> I u V ^ u (T u O y jqp p j yy |
ennnylvania Pouer i Light Co. 8O/07/S2. Epp
DOCKETED ITEMS
239
, ^"9
Interim deficiency yept re improper safety classification
solenoid valves Final rept will be provided in Nov 1*?BO
lBjN W Pennsylvania Pcmer & Lighb Co BO/07/33 Ip
' B*}Q7 t,j, Supplemental doflcmney rept updating statue of improper
• JJ-'enoId valve safety classification Dechtel Power Corp
g final rept uin be available Oct l<?aO & util final
Iclencg rept hij Nav 19BO
M Pennsylvania Pouer & Light CD 30/07/23 Ip
30-388 BUBQUEHANNA STCAM ELECTRIC STATION! UNIT 2
"Pp-liifltiDti/cnnstrtictioii stage document-a I- corresp on do nee
Forwards NFIC evaluation of G£ rept, NEDE-24010-P 6 Suppls
< "Technical Basis for Use of aquflre-Root-of-Sum-Df-
*rBS (BF18BI Method for CornSining Dynamic: Loads for Mark
I* I ants " Rapt acceptable- subj to certain constraints
a J, Division of Safoty Technology aO/Ob/HS 3pp
Notification of B00714-17 meeting w/irtll.GE & Bochtel in
*li««da, MD to review open items For facility FSAR
d bij NRC Mechanical Engineering Branch
H Licensing Branch 1 BO/DA/at Bpp
SO07O1O273 Forwards Comni'islon "Statement nf Interim policy on Nucleai
Power Plant At ti dent Cons i dcrat i ons under NEPA of 1961?, "
published in B00613 FH Commission dc r i sion, CLI-BO-OB !i ASLAD
dec ision. ALAD-307 end «/o attachments
CUTCH1N, J M Hearing Branch 3 BO/0(,/I7 3pp
6007310313 Forwards Commission BQ0327 ne-rnorandum b ordnr containing
decisions nn UCS 7BO303 petition fot recons i derat 1 on of
780413 memorandum *< order UC.S 771104 petition sought action
E1SENHUT.DG Divistan of Licensing BOJQhfSS 87pp
3007130709 rtJvliP', ttiot FES is scheduled to b & issued in Dff€ 19 BO,
safety evaluation ITI Feb 1901 ft safety evsluatiOTi suppl in
Matj 1191 Further BigrnFicant changes uill be- provided per
NRC 790127-3) preheaung c omrri trnent. i f necessarij
CUTCH1N. J M Hearing Branch 3 BO/07/10 2pp
K Utility Tinal Safety Una 1 y ;
<FSAR> L amends
B0070B0310 Foruartfs marked-up copy oF FSAR. Subsect ion 3 13 t, Table
program Changes uill be discussed at draft £ER meeting
during ujl, of S00711
CUf1T!3.N H Pennsylvania Power ^ LigJtt Co 80/07/03 llpp
Fortvards statement of policij re requirements to bB mat far
DH, applicatiaeis, as derived From WJREG-0660 k found
-o&lJ4
IBCNHUT.D 0 Diviiion at Licenting BO/O&/2& ?op
Forwari)« requnst Far add! info re reactor *ga
, B J Liceniins Branch 1 30/06/27 2pp
GDD7S4O131 Forward i Amend 33 to application Fcr DL consisting at
[division 16 to FSAR
CURTIS, N II Pannsglvanla Pouer t, Ligjit Co GO/07/11 Ip
— tJQ073401<>a AinoncI 33 to application for QL consisting of Revision li to
FBAR
CURTIS, N 14 Pfrnnnjl vaniii Pouer I. Light CD 8O/O7/14 Ip
Bummorij of B00612 meeting u/Harh II ounera grou-p in
"*h»«dn,HO ra lead plant closure fc long-term proBTom Mods
hnuld br mada to generic load plant condensation
• 'Collation Si chugging pool boundarij loads Viowgraphs enc 1
M»ERSDN,C J Generic IBGUBS Branch BO/07/03 57pp
—80072^0143 Revision Ifi to F3AB
* PnnnHulvania Power d Light Co
BO/07/1 A 600pp
P Operating ILCPUSC- stage documents t- correspondence
CommantB on eoo>711-16 meeting u/NRC in Bethesda.MD to
Dsalve IISIJBS & an filler qgemtions on FSAR Sections 3 4-10
p>*»n li«unt uar-B resolved t< meeting uaa productive Lliraixlng
• n«gar> should have Input in selecting meeting location
LftRTI&N W Pennsylvania Poiuer & Light Co BO/07/ IB 3pp.
0007100373 Submits addl info rp imp 1 Bmentatton of short-term Lessons
Learned requirements Status of remaining Category A it en 6,
mld-ijT status of design & installation af Categor-g D mnria &
schedule far Implementation encl Foruiarils drauings
BYLVlrt.O R Uis-ginia Electric & Pouier Co BO/07/O7 IGOpp
Advise* that ui thhol ding affidavit per lOCfHS 770 mint be
Jh mitted to auppart BOO609 request re Revision a to design
aBBiimBnfc rept Affidavit must be trans mitt ad within 30
DUB.
UUHCBLPGD, B J LKanaing Branch 1 BO/07/SJ Spp
7S9O17S Motif tcation of BOOSO5 meetina lu/repr B&entati v«s from Mart
I cutters group in Chicago. IL to dlscusa lead Hark II plants
tugging b C/O load apoes
C Oenerlt Issues Branch BO/07/23 Spp
Q Inspection repoTts. IE Bulletins !<
spontfenc
HotiPltation of BOOS21 meeting ui/util in Dethestfa.HD to
Locum responses to ReActdP S(j i Branch questions
M Llcensina Branch 1 BO/07/23 3pp
medical, eae-rgencij ti fire prntection plans
^£230-323 Summary of BOOilt meeting ui/util in Gethesda, MD to r&ceiv
l p. I leant queslinns re technical support etr & emer g enc y
>«jratlons faclllbg Applicant uishia to clarify
i t nrpretation of certain NRC requirements
H Licensing Bi-anrh 1 30/07/1O 4pp
f£j 20 4 11 Fnruartts "Studij Rept for Busquehanna fiteam Electric
t»« notification & Evacuation." Part li prepared bij AM
IT**"" & Aosociates Rept in response to NHC SOO70H request.
M Pennaglvania Power R Light Co HO/07/17 Ip
Forwards IE Bulletin BO-13. "CracHno in Core Spray
Bjiargers " Mo written response required
GRIEFi.D H Region 1. Philadelphia, Office at the Director
BO/05/1 3 Ip
B007170A37 Fortoards IE Insp Repts "50-397/80-07 !. 30-303/00-05 on
BOOC21-21 Ho riont omp3 1 ance noted
CARLSON, R T Region 1. Phi 1 adel pN i a. Aeactor Construction &
Engineering Support Brancft BO/O5/2B 2pp
— 8007170643 IE Ir-sp Repts 5Q-3S7/SO-07 !, 50-3Ba/BO-05 on 600131-34 No
noncampli once noted Major araas inspected s.1 te auifit ppagran
& outstanding items
DURR, J P Reglun I, Philadelphia. Office of the Director
TRIPP.L E Region I, Phi ladel pfi i a. Reactor Construction &
Engineering- Support Branch SO/09/23 Gp p
B0070l02<!i2 Forwards IE InFn Notice BO-33, "Loss of Suction to Emergent!)
Feeduater Pumps " Wo uTittvn response required
GRIER.U H Region I. Philadelphia, Office at the Director
BO/05/29 1 p
BOQ7170249 Forwards IE Inap Repts 30-367/80-11 & 30-3(30/30-07 on
90-0513-16 No nontomp] lance noted
CARLSON, H T Region 1, Philadelphia, Reactor Construction 6
Engineering Support Branch 00/06/03 2pp
Study Rept for Susquahanna Steam Electric Station Mas
F40tif It at ion & Evacuat ioni " Part 1
* PUC Planning & Economics, Alan M Voophees (. rtsaneiates Div
id jtJd (catorg correspondenc e
rt>l°a76 Responds to BOO&07 Itr Transcripts of NHC technical meetings
r_ppHcants are not available due to unofficial aspect.
»-W»i»r-iHB of meetings available in LPDRs Future Itrs on
of intvrvinors should be sent to NRC counsel
M Hearing Branch 3 BO/Ofi/16 Ip
8007170337 IE Insp Repts 50-307/60-11 !< 50-300/BO-Q7 on 800513-16 No
nontomp liance noted Major areas inEpected site activities t
revieu of NHC Insp status
DURfii J P Region 1, Philadelphia, Office af the Director
MCQAUOHV.fi H Region 1. Philadelphia' Ftcartor Construction &
Engineering Support Brstith Bt>/Oc./O2 2pj>
Foruards IE Info Notice BO-36. "EvaluBtion of Contractor
OA Programs " No written response required
OR1EH, [f H Region 1. >Phi ladelph I a. Office of ths Director
BO/Ofi/10 Ip
240
DOCKETED ITEMS
8007110207 Fortdrds IE Bulletin BO-lfl 'Degi-adat ion of BUR 5cram
Discharge Vol ''aprfb 1 1 1 ty Jl Np urittcn respaTiBe required
GRIER.B M Region I, Ph i ladelphia. OfFice of the Dirertor
BO/06/12 lp
B0072S0612 FDr'jsrfls IE Info Notice SD-as, 'Prompt Reporting of Info in
Accordance U/lOrFRSO S5(e) ' No written response required
CRIER, D H Region I. Philadelphia, Office of the Director
80/06/13 Ip
8007030513 Forwards [£ circular 80-15, "Loas of Reactor Coolant Pump
Cooling 'c fjatural Circulation Cooldoun " No written responsa
requireif
GHIER, 0 H Region 1. Philadelphia, Dffice of the Director
80/06/20 Ip
B007I60733 Fcruards ]E Circular 00-14, "HsiJioactive Contamination of
Plant n^mineraluei) Water Bijs J. Resultant Internal
Contamination of Personnel " HD written response refjuireil
ORIER.B H Region I Philadelphia, Office of the Director
ftO/06/24 lp
BO072I0271 ForuiariJ* IE Info Notice 90-24, "Lou Level Radwaste Burial
Criteria " No written response requirea
CRIEB.BH Region 1, Philadelphia, Office of the Director
BO/06/25 lp
BOQ7210334 Ack receipt of BQ0613 1 tr informing NfiC of steps taften to
correct violations noted in IE Insp Repts 50-3B7/BO-01 t
CABLBON B T fleginn 1. Philadelphia, Reactor Construction &
Enjincermg Support Branch BD/06/27 lp
— B007210341 Responds to NRC B00514 Itr re violations noted in IE Insp
Repts 50-397/00-01 J. &0-3BB'SO-01 Correctiva actions all
ipace heaters in motor centra! ctrs identified, enorgiied d
checked periodically
SABDL.rt R Pennsylvania Power J, Light Co SO/06/13 3pp
— B0073IO34S Forwards IE Insp Repti SO-3B7/80-03 (. 50-3B8/60-01 nn
B0012I-0201 I, 0211-29 t, notice of violation
CARLSON-R T Region 1. Philadelphia, Reactor Construction f.
Engineering Support Branch 80/03/14 2pp
—B007210349 Notice of violation from »n»p on BD0121-O201 (i O211-39
* Region 1. Philadelphia, Office of the Director BO/Ofl/09 Spp
—B0072103S5 IE Insp RBP15 5D-^B7/BO-01 ?, 50'3BB/BO-OI on BDQ121-O201 {,
0311 29 NoncompliancB noted failure to foljom approved
procedures during preventive maint (, to establish proper
test program for performance of hydrostatic testing
MU.O.B H , RHOADS.G 0 Region I, Philadelphia. Office of the
Director MCGAUCHY. R VI Region 1, Ph> ladelphia. Reactor
Construction & Engineering Support Branch 00/04/09 18pp
8007330164 Forwards IE Bulletin BO-16, "Potential M, sepplicat ion of
Roseaount Inc Models t!5l !, ,152 Pri-ssure Transmute"
U/Eith«r A or D Output Codes - Written response Pefluired
I0"1.6 alS° B"C1 No uriltcn response rea"lr0d
,"••'«"> >• Philadelphia, Dff.ce of the Director
B0071S0339 Atfvi^s that ASME C0de Cases M-234 a N-335 have been
approved for u*e in reactor pressure vessel preiervice inso
program
VOUNOBLOOD, B J Lieensinfl Branch 1 SO/O6/3B 2pp
^1 a"rf! infD 1° *>' 'n "«1't« "»««» revi
-*„.£ h i ? requirements J, to provide commitment to
adopt whatever lonq-ttr* solution is approved Any .bort-t«w
OPtfC5hQ
of th.
-WOWSOOW, O.«rlb.,
, .«rlb., BOOlaS t.icon M/R HiUoB re .n.-.tl.n. c
«nd.r5round p^,^ ft passlrig unqual,,lEd ^d.v,^^* on "S C
welfltng tests Mnspn refused to provide specific info
Ks ^"wfil/r;1"1 wilso" u" «* •« J'» e •* "*.
K'torM BoJ^03 ' iP^fcl°" »• ^^""-t. Pff.ce of th
nncerning
S Reportahle occurrences. LERs !< related correspondence
8007170671 Ac* receipt nf 000513 interim deficiency rept re pilot
solenoid valve classification Resolution of deficiency
pending receipt of final ropt
CARLSON, R T Region I, Ph i ladolph ia, Reactor Construction i
Engineering Support Branch BO/06/11 lp
0007170610 Ack receipt of 300329 interim deficiency rnpt r« pip*
supports utilise! to containment liner plate Rept till 1 1 ba
reviewed & evaluated
CARLSON, f) T Region 1. Phi ladelphis. Offlcs of the Director
BO/06/13 ip
BOO 70 BOS 13 Supplemental deficiency rapt ro Pacific chuck valvai.
Problems y/check valve operation in Ur>(t 1 core spray pump
discharge vertical pipe run mil necessitate rework of
bonnet stops Final rcpt will be provided by Stpt I9BO
CURTIS, N U Pennsylvania Pouier t, Light Co BO/07/03 2pp
B00714Q17O Forwards final deficiency rept re Insulation danaon l<
deficient pin crimps m poiiier goneratian control complex/
advanced control room panel connoctora
CURTIS.N W Pennsylvania Power & Light Co BO/07/03 Qpp
—8007110179 Final deficiency rept re insulation damage fc deficient pi
crimps in power generation control comp lo»/»dvancBd control
room panel connt-ctorE Cause unidentified Vi»unl insp fc pull
test initiated nn Unit 1
» Pennsylvania Power & Light Co 0O/O7/OH 2pp
B0071SO43-t Interim repi,, per 10CFR50, S3(c ) «c Part 31, re premature ti»«
out b drifting sat points for pneumatic time delay r«l«ys
associated w/A3asta.t 70OO & OE CR 2020 relays BecStol &
otil analyiing safety impact
CURTIS. N H Pennsylvania Power 6 Light Co BO/07/11 2pp
B007390B65 Ack receipt of BOOild final Deficiency rept ro Lt«ifcorq.u*
motor operated vslv0 stem nut staking
CARLSON. R T Region 1, Philadelphia, Reactor Construction &
Engineering Support Branch SO/07/11 lp
SQ071803M Potential deficiency rept re coped structural floor beaut
Based on results of field in-ip (, finite element analysis,
conditions noted ar B nonconf orming !• are therefore not
reportable per 10CFR95(e) Bochtel procedures revised
CURTIS.N g Pennsylvania Poiuer *. Light Co, fiO/07/lfl 9pp
B007S304a7 interim dofictency rapt re status of Anchor Darling valvft
yokes AE has advised final rBpt on cra.cliDd yokes on Anchor
Darling valves luill be available in Ana 19BO Final rept will
bs forwarded durlns Sept J90D
CURTIS.N W Pennsylvania Poumr t< Light Ca 00/07/21 lp
0007200215 Finai Deficiency MCAH 1 -38, per 10CFB90 95(«) I, f>art Bl,r» OE
equipment lacHnfl proper slope CautBil by unclear de*ign
drawings !, const FailuroB All affected drauinos will be
revised t, Unit 1 as-builfea completed hu 601S30
CURTIS.N W Pennsylvania Power & Light Co HO/07/S1
Pennsylvania Power t, Light Co
n
CURTIB.N W Pennsylvania Pouer It Light Co SO/Q7/33 Spo
0007390623 Supplements t, updatos projected completion dat. of
corrections re pipe support design drawings Oeihtel Power
?9B? Ut P"v|dB f?na!,re!'t o" ^Pective condition by M.r
ivm Util final rept mill be provided by Apr 1901
CURTIS.N W Parinsylvanla Poiuer * Light Co BO/07/SB Spp
nJerlT dofil:i'"":« >-»Pt >•• i-np.-oper safety clat.if i
Uld valv",Fl"a' SeP* «'" fc» provided m Nov WHO,
W Pennaylvania Pouer & Light Co 80/07/33 Jp
tatlon
"1"""*;1 deficiency rept updatlna statu« of iwp
mu i «iv'1"'tt« *J-"ifi»ti«i Qechtel PDWer Corp *W'i
HCAR -35 final rept will 00 available Dct 19HO (, util final
deficiency rcpt by Nov 19HO
CURTIS.N H Pennsylvania Power t, Light Co BO/07/23 Ip
DOCKETED ITEMS
241
DOCKET 5Q-3B9 ST LUflE PLANT, UNIT a
A Application/construction stage documents & correspondence
BQ0703Q173 Forwards orgdniiation charts For Ufc of Nuclear Reactor
Regulation effective BO042B States moons of appeal of utaFf
pOB 1 tLon
L Assistant Director for Licensing E30/0&/12 2pp
9007250407 Di*cii
of documonl produi.
until da<.umi?nt5 ar
postpone uti] Linsu
DEWEY.L 3 Antit
<i util V FL citie-s 8O071B Itr to rtSLH r
i. t inn MHL will nut agree on completion
rp obtainpd !i itvieiueJ HUC IB ijilling t
uiers to lilt ei rnijd tul 105 i nief 1 in t D ] ij
completion
t Di
BO/Q7/S1
Spp
: tton reports. IT Bulleli
*.pond ante
' 'I Forwards statement of policy re requirements to be met for
curreri. UL app 1 icat i ons, as derived from NUREG-0660 * found
In NUHFG-0694
EISENHUT.D G Division of Licensing 80/06/26 2pp
SOO724020fa FOTUara" IE Info Notice BO-^O. "Loss of UetJiij Heat Removal
Capability at Davi '> -Dp O^B nn 1 1 1 While in Uefucllng Mode "
No response required
D'REILLY.J P Region 2 Atlanta, Office aP the Dirsrtur HO/OVQB
2PB
F So-cunty, raedicalj emergency t. fire protection plans
BQQ7O1Q379 Forwards BNI fire protection revieu re upgrading eiistinj
fire pumps, cdble s() readi nq room, fire barr ler, smnke
dwts-ctorsi reactor toolnnt pump oil collection SIJB (<
automatic » prink lei iijs for fat 1 1 i tij
HALL.R E Bronkhaven National Laboratory BO/Oi/24 ipp
BQQ7Hao&47 Advises that evacuation time Estimates mere submitted in
B00717 Itr per 00O70S request
UHRIQiR E Florida Pouor '« Light Ou BQ/Q7/33 lp
BOO7070165 Foruard? li; Insp Rept. 50-381?/Bfl-Clfc on H00430-0503 No
noncomplicihCB ncted
MUHPHY. C E Hcyinn 2. Atlanta. Reactor COHE true ti o-n t. En-g i nocr ing
Support Branch fJCVOS/17 2(>r.
—B00707O1A9 IE !nsp Ri>p t 5O-TS9/BD-06 on EJ00430-O3O2 No none amp 1 1 ance
not I'd Major arpss inspected Blrrtric.Tl t. Ins tr umen lotion
OA implementing proroilurea rrwieu for (.iasa IE toniponenta !•
SIJE (, Par Class IE nabU'i tc terminations
HALTERB-D K Rpgion 3. Atlnntn, OFfire nf ttie Director
CONLON. T E FlegiQn 2, rttlant-a, (lenctor CDTIB true 1 1 on fi Erigineertng
Supjioi-t Uranrti DO/O5/19 ^pp
Ad j ucl itatory corre
B0073i0213 Forwards Commission BOD3H7 memorandum t. order containing
doci«ioTis on UC9 730302 petition For reronsideration of
7811413 memorandum * order UCS 771104 petition sought flttion
r« fire protection for electrical cable's
0 Division of Liconalnu
General CorreBponi) enca
HO0711O3O& RespondH to BOOSIH Itr re end L Etarr 1 tv concerning plant
problems Nuclear plant safety design approach involves use
of multiple physical barriers to prevent relea->o nf
radioactivity to -environ
DIRCKSj H J Office of the Executive IMroctor for Operations
any 04/30 9Pp
— HOO71103H Requests response to L Starr Itr concerning plant problems
CHILES, L J Senate SO/05/ IS lp
BOO734O444 Responds to BOOSSl Itr re S Corbin innuirij about plant
safety aspects Safety denlgn approach Involves use of
multiple physical barriers to prevent release of
radioactivity to environ
DIRCKB, W J Office of the Enecutive Director fop Operations
BO/O7/15 3pp
— 0007210463 Requests: response to end S Corbin inquiry about plant
safety aspects
STONE, R Senate 0O/05/S1 Spp
M Antitrust correspondent: a
BOO7O90O51 Comment* on Orlando lit U s notice of ul thdrawal re order
ninitlfijino CPs Other Intel vening cltie* must be given similar
nuclear access opportunities Urges establishment of
procedure* allouing author to be near* H/Certi Picate of Svc
JABLQN. R A Florida Cities JAJJLQNj R A Spiegel & McDiarmid
BO/O7/O7 4pp
BOO713O719 Hosponse stating no objection to Orlando Lit i It Commission
800&2Q withdrawal of inte-rvention FL Cities SQQ7O7 comments
ra equal treatment uill be addressed in l/nit 3 antitrust
proceeding Certificate Svc encl
DEWEV.L B Antitrust Division 00/07/11 4pp
BOO723079S Advises of eitension until BOD7I6 for FL Cities & util to
reopond to interrogatories NRC *< nOJ have no objection to
•itenalon ASLD approval requested1 Certificate OF Svc encl
ROTH. A J Florida Cities DOUKNIQHT. J A Florida Power !< Light Co
aO/07/lB 3pp
BOO7al?OOO4 Foruards notice of receipt of addl antitrust Info which is
tn b« published in Fft
YOUNOBLOOD, B J Licensing Branch 1 00/07/31 lp
8007390733 Order granting eitenaion until B00"71i for FL Cities !. util
to respond to interrogatories
SMITH. 1 W Atomic Safety and Licensing Board Panel BO/ 07/23 lp
BOO70H0531 Foiuards IE Info Notno HO-H2. "Break downs In Contaaima t ion
Control Program"; " Nu urittrn responap rsquirod
O'REILLV.JP nogion 3, Atlanta. Office of the Director 00/05/30
IP
B00731O45O Foruiard s IE CncuLir RO-13. "BnU Strap Damage in
Mestinghouse Fuel At«,ernhlics " No written response roquired
O'FIEILLY.JP RBQIQH E, Atlanta, Dff.ce of the Director
IP
BOO701020fi rorusrfls IE InFo Nntico SQ-33, "Lota of Jinction to Emergency
Feoduater Pumps " No written response required
Q'FIEILLY.O P nogion 3. Atlanta, Office of trte Director HO/O5/2-?
IP
a0072300i2 Foruiards IE InFo Notite 30-26 "Evaluation of Contractor
OA Programs " No written rosponse required
Q'RCILLV.JP (legion 2, Atlanta. Office of the Director HO/Ofa/10
Spp
8O07160H65 Foriuards IE Infn Nutice BO-37, Degradation of fleactor
Coolant Pump Studs ' No specific action or response
requireU
O'REILLY. JP Rpginn S. Atlanta, QfFiuo of thu Director BO/Ofc/11
B0073S037a Furiuards IE Info Nulitc B0-3a, HIProropt Raportina nf Info in
Accordtinte W/1QCFRSO 55*1!) " No written response required
O'REILLV.JP Wegmn a. Atlanta, Office of the [Hrectoi- BO/06/13
Hpp
30070204515 Forwards It Circular BO-IS. "Loss of Ueactor Coolant Pump
Cooling t. Natural Circulation Cooldoun " Ho written response
require!)
D'REILIY.JP Reainn 2. Atlnnta, Office of the Directur Su/Od/EHO
0007170109 Furiuards 1C Circular BO-IA, "Had i oact i VB Cnntaminat ion nF
Plant DPnincral i led Hater SyG «( Hesultfint Internal
Contamma tinn of Personnel " Ha urittisn response requirnd
O'REILLY, J P Region 2, Atlanta, Dfftcp nf the Director 30/06/34
BOO723O243 Forwaids IE Uullotln BO-li, "Potential tli-isppl icat i on n P
Rosemnuiit Inc MDdcls 11!H Si 1 1'iS Crpssm E Tran Emitters
U/Either A or D Output Code*, " Written reaiiDnse required
IE Ctrc ul ar BO- It alsu encl No ujiitton response rcnulred
O'REILLV.JP Regiun 2. Atlanta. Office nf the Director BO/Dt./27
BOO7S1O060' Providps interim response to IE IJullfltin HQ-OB. "E< oral nation
of Containment Lini-r PenBtiflt i nn Hslds " Facility utlliieE
flued head design iienctratmn conn&c t ions Records under
review Tables encl
UHRIS.R E Flnrlda Pouior (. Light Co 80/07/O7 13pp
BOO7310213 Acli receipt of EJ007O7 1 ti informing NBC of steps taken to
correct violation noted in IiZ Inve si igatunn Rept 50-3B9/
80-05
MUflPHVi C E Rpgion a, Atlanta, fieactur Cona li-uct i on t. Eng inear Ing
Support Branch BO/O7/21 lp
42
DOCKETED ITEMS
8007310230 Responds to NRC 800609 Itr re violation noted in IE
Investigation Rept 5Q-3B9/BO-Q5 Corrective actions back of
each individual TP badge uill be stamped u/eertif ication
held
UHRIG.R E Florida Pouer (. Light Co BO/O6/27 3pp
8OD7310233 Forward-, IE Investigation Rept 50-3B9/80-03 nn B0040B t,
21-24 fc notice of violation
O'REILLY. J P Region 2. Atlanta. Offite of the Director
80/06/09 2pp
8007310328 Notice of violation From investigation on BOO 4 08 (•
* Region 3. Atlanta, Office of the Director BO/06/09 If
0 Inspection reports. IE Bulletins t, correspondence
B007240Q89 Forwards IE Info Nc-ticO BO-30. "Loss of Decay Heat ftinuval
Capability at Davis-Besse Unit I While in Refueling Mode "
No response required
O'HEILLV.J P Region 2. Atlanta. Office of the Director BO/03/08
3pp
BDQ7020192 Foruiardu IE Info Notice BO-22. "Breakdowns In Contamination
Control Programs " No written response required
Q'KEILLY.JP Region 2. Atlanta. Office of the Director 00/05/28,
B007310235 IE Investigation flept 5Q-3B9/SO-05 on B0040B (, 31-34
Noncompl lane e noted failure to follow procedure requirement
to use certified nondestructive ejamination personnel
LONQ.F H > MCGUIRE.D R Region 2. Atlanta. Office of the Director
VANDDDHN, P K Region S- Atlanta. Reactor Construction t,
Engineering Support Branch BO/06/01? 6pp
Reportahle occurrences. LEfls It related correspondence
80072IQ4BB Fnruards IE Circular BO-13. "Grid Strap Damafl" in
Westinghouse Fuel Assemblies " No written response required
O'REILLY.J P Region 2. Atlanta. OPfice of the Director 00/09/38
SOO701O22S Forwards IE Info Notice BO-23, "Loss of Suction to E«i«rflBnc«
Feodwator Pumps " Ha written response required
O'REILLY. J P Region 2. Atlanta. Office of the Director BO/05/K9
IP
B71AQ59? Advises that final deficiency rept re dieiel generator
control panel! lull] be delayed until 800731
JHRIO.R E Florida Pouer I, Light Co SO/Qi/17 )p
B007220029 Forwards IE Info Notice BO-26, "Evaluation of Contractor
QA Programs " No uritten response required
O'REILLY, J P Region 2, Atlanta. Office of the Director BO/Oi/10
3pp
•KET 30-390 HATTS BAR NUCLEAfl PLANT, UNIT 1
Application/construction stage documents & correspondence
'7Q1O14B Requests add! info uiithin tuo wks, needed to determine
'Otential for underclad cracting in reactor vessel nnnles
lltraaonic eiara» did not indicate explicit correlation
etueen observed cracking d pre/post-clad heat treatment
iCKMENCER.A Licensing Branch 2 BO/06/1B 2pp
7020707 Foruiards request for info re confirmatory piping analysis
eaponse should be submitted to AM, by B007O3 Includes infu
Jiptng layout t. isometric drauiinjs sufficient to model
gs t support drawings iii/support d hangar spring rates
CHWENCER.A Licensing Branch 2 BO/06/23 3pp
70IO3B6 Advises that util has received no response to 790938 request
nr eitensiotis until Mar (c Dae 19B1 for Watts Bar 1 & 3 Add!
iFsty requirements may result in completion by Jan I9B1
•r Sequotjah S. May 19B1 for Watts 1 It Feb 19B2 fqr Watt« 2
ILL5.L M Tennessee Valley Authority 00/06/26 Ip
'23QO01 Foruarili statement of policy re requirements to be met for
irrent DL applications, as donved from NUREO-0660 It found
. NUREO-0694
SENHUT.D 0 Division of Licensing BO/06/26 2pp
'030253 Forwards addl request re ultrasonic eiam of melds
LLS.LH Tennessee Valley Authority 80/07/01 3pp
3005B4 Notification of contract eiecution. Mod 2 to "Evaluation of
=*ling Stress Criteria for Steel Containment at Watts
P- " Contractor Intl Structural Engineers
ASESSER.C H Purchasing Section FIN IJ-65B1 SO/O7/02 Ip
80071602B7 Foruiards IE Info Notice BO-27. "Degradation of Rtactor
Coolant Pump Btuda " No specific action or response
required
O'REILLV, JP Region S. Atlanta, Office of the Director BO/Oi/11
6007250381 Foruiards IE Infn Notice 80-2B, "Prompt llBportino of info in
Actordance U/lOCFflSO 55(e! " No uritten response rnquirad,
O'REILLY. JP Region 2, Atlanta. Office of thn Director 60/04/13
3pp
G00739Q40O Foruiards IE Insp Rept 9O-390/BO-17 on 000329 k 30 No
nontompliance noted
8TDHR.J P Region 3, Atlanta, Fuel Facility 6 Materials Safety
Branch 80/O6/I7 2pp
— B007290404 IE Insp Rept 90-390/80-17 on B0032? Ic 30
No nnncomp 1 iance noted Major areas inspected environ
monitoring programs d environ protection program
JENKINS, 0 R Region S, Atlanta. Fuel Facility tt H'terlalt Safety
Branch CUNNINGHAM, A L Region 2, Atlanta, Office of th»
Director 80/0i/17 3pp
B007030391 Formards IE Circular 80-13. "Loss of Reactor Coolant Punp
Cooling b Natural Circulation Cooldown " No uritten reiponi*
required
O'REILLY.J P Region 3, Atlanta, Office of the Director BD/06/20.
S007170070 Forwards IE Circular BO-14. "Radloflctive Contamination of
Plant Deminerallied Mater Sys (, Resultant Internal
Contamination of Personnel " No written response required,
O'REILLY, J P Region S, Atlanta, Office of the Director BO/06/B4,
IP
073C-OSB7 Hoi 3. changing completion date, to "Evaluation of Euckling
Stress Criteria fqr Steel Containment at Watts Bar "
International Structural Engineers, Inc FERLMAN, J
Administrative Contracts Branch FIN B-i991 BO/07/02 Ip
d judicatory correspondence
J1O243 Foriuarrfs Commission BOO527 memorandum f< order containing
i»ion* on UCB 7B05O2 petition for reconsideration of
M13 memorandum 6 order UCB 771104 petition sought action
fire protection for electrical cables
3ENHUT.D 0 Division of Licensing BO/06/25 B9pp
Q007230253 Forwards IE Bulletin 00-16, "Potential Misapplication of
Rosemount Inc Models 1131 t, 1153 Pressure Transmitters
W/Glther A or D Output Codes " written response required
IE Circular 80-16 also end No written response rtqulrod
O'REILLY. JP Region Ci Atlanta, Office of the Director
IP
HO/Oi/27
B007B10O36 Forwards response to IE Bulletin BO-OB re-eiamination of
containment IJnor penetration welds Penetrations at
Sequouah, Watts Bar Si Dellefonte contain flued head de*inn
Design for Yellow Craek not yet completed
MILLS, L M Tennessee Valley Authority BO/07/08, Spp,
B007170373 Responds to NHC 800617 1 tr ru violations not*d in IE Imp
ftept» 50-390/80-14 (. 50-391/BQ-10 Corrective actions u»ld
procedure changed to allow use of l/B-inch Filler metal for
root pass t< inspectors instructed to fallow instruction*
MILLS, L M, Tennessee Valley Authority BO/07/10 3pp
B007230SS2 Responds to NRC Itr r. violation noted in IE Insp ftept
50-370/80-16 Corrective actions starting on B0041B, items in
room identified bu engineering uero cleaned * returned to
warehouse per WHNP-QCP-1 6
MILLS.L H Tennessee Valley Authority BO/07/15 flpp.
DOCKETED ITEMS
243
QO07270B13 Responds to 800626 request for add! actions to avoid further
nnncoopl lance & date full compliance achieved re plant area*
v/apen pipe ends & manuals IB ft unattended QA program
Initiated to check coverage Full compliance by QOQ714
HILLS.L tl TennuBBHe Valley Authority BO/07/23 Bpp
Reportable occurrences, LERs & ^elate'd corresponitenie
V Operator Eiami rvationt
B0070B03SB Notifies that response to NRC 300603 I tr rir operator
training maa submitted »n M CalJioun B00416 1 tr to P
Cnllina
N1LL8,L M Tonneasee Valley Authority BO/O7/O1 Ip
(3QQ7Q20619 Fifth interim deficiency rept re refueling water storage
tink overflow line not fabricated to ABHE code Pittsburgh-
De* Hollies Steel Co t. TVA discussing repairs Neit rept mill
be provided by 800905
MILLS, L M Tennessee Valley Authority B0/0£./ia lp
BM7I40571 Forward B final deficiency rept re chomlial b vol
centrifugal charging pumps
MILLBjL, M Tennessee Valley Authority BO/Oi/lB lp
:orttral ays
DOCKET SO-391 WATTS DAF1 NUCLEAR PLANT, UNIT 2
A Application.^ ons trutti on stage documents & corr E spend « nee
BOO7010148 F(ei]iifrits adifl info within iwo uik 5, need nd to determine
putantial far un<lerclrsd cracking in reactor vosstl noiilen
Ultrasonic eians did not indicate explicit correlation
'bB'tueeri observed cracking d pre /post-c lad heat treatment
8CHUENCEH.A Licensing Branch 3 BO/Oi/18 3pp
*fl0071>£rO-97B Final deficiency rept ro potential for degradation of one or
nore chemical & vol control ays centrifugal charging pumps
Design fc plant emergency operating procedures will be
nadlfledias recommended by Meetinghouse
* Tannessea Valley Authority HO/Oi/lB 2pp
BOO7020707 Forwards request Par into re- conf irmatary piping analysis
Response should be submitted tu ANL by BCO703 Includes Info
re piping layout & isometric drauiings sufficient to model
ays ti support drawings u/iupport t< hanger spring rates
SCHUENCEfl, A Liiensing Branch 2 60/06/23 3pp
B0071706(>4 Part 21 final rept re Uiratinghouse chemical d vol control
tyi ceritrlfuoal charging pumps Follouing secondary Bide high
inirgi) kine ruptun ti aasodlated roactor trip.min floui may
not be met Emergency operating procedures modified
J1ILLfl,L M Tennessee Valley Authority QD/06/18 4pp
HOO70103B6 Atfvi SBS that util has received no roBpiinse to 790938
for eitensions until Mar K, Dec 19B1 For Watts Bar 1 ti 3 Addl
safety requi rement & may result in completion by Jan I'iOl
tor Bfrquoijah 2. May I9B1 For Watts 1 & Feb I9H2 Por Watts 2
MILLS, L M Tennessee Valley Authority BO/06/S6 ip
B00707022S Second interim deficiency rept re radiation tualif iestion op
siif<ti|--related cables «nel in conduit inside containment
Utll continuing to Invtstigate Rept detailing results of
•Valuation & corrective actions eipectad by 800719
MRL9, L M, Tennessee Valley Authority BO/07/QI. lp
[1007140433 Forwards first interim dificUncy rept r« insufficient
•nilysi* of 3-inch Fir* protection lints Will submit not
ript by BOQ902
MTLLB, L M Tennessee Valley Authority SO/07/O3 lp
— BOO7140427 First Interim deficiency ropt re insufficient analysis of
3-inch fire protection lines Layout drawings did not provide
luFFltlont dimenaiont Three-Inch fire protection lin»s uill
be rigorously analyivd & supports uill be added
* Tennetsae Valley Authority 80/07/03 lp
8O07 170313 Foruards first interim deficiency rept rt cutting of conduit
upnorti U/D cutting release
HILLS, |_,M, Tenn»«ee Valley Authority 80/O7/1I lp
B007230001 Foruiarils statement oP policy ra requ irornetits to be met For
current OL appl i cationi, as ilerlved From NUREO-O&AO *i fo\jnd
in NUREO-0491
EIBENHUT.D O tUvision of Licensing SO/OA/Hfi 3pp
8007080253 Forwards addl request te ultrasonic e»a(n af uields
HILLBi L M TenneBBee Valley Authoritij 8O/07/OI 3pp
800730OSB4 Notification of contract e>B-cution. Mod 2 to "Evaluation oF
HLcllirg Btroaa Criteria Pnr Stoel Contaiiiinent at Watts
Bar " Contractor tntl Structural Engineers
TRAOESSEn.C H Purthasing Soctlan TIN 0-6981 8QVO7/OS lp
— 8007300387 Mod 2, changing completion 4ate, to "Evaluation of Buckling
BtrosB Criteria for Steel Cortainmont at Watts Bar "
• International Structural Etigln*flra. Inc PERLMANi J
Administrative Contrasts Branch FIN D-i501 80/07/03 ip
O Ad jud icatorij correspoculoncB
-9007170535 First interim deflciBncy rept re cutting of conduit supports
w/o cutting release Investigation underway Addl Info
•xptcttd by 800829
• Tennessee Vllley Authority. 80/07/11 lp.
SOO731OS'13 FoTuards Camraission fiOOSa? memorandum b ord »r containins
decisions on UCB 7QOSoa pptition for reconsideration at
730413 memorandum & order UC8 771 1O4 petition sought action
re fire protection for electrical cables
EIBEWHUTiD 0 Division pF Licensing BU/06/H3 fl?pp
S007170S?! Fourth interim deficiency rept re incarrect analysis of
total 'tiff range for essential rau cooling water piping
IncorTBct analysis confined to piping in au»lllaTy fc reactor
bldgi.Heu thermal analyse* underway
MILLS, L M Tennessee Valley Authority BO/O7/ 1 1 2pp
BO07S30137 Second interim deficiency rept r> inad«nuat* documentabion
for mticillaneous mechanical equipment Applicable QC
procedures written or revised to include omitted equipment
Available documentation to be reviewed for further action
HILLS. L.M, Tennessee Valley Authority 80/07/15 lp.
e007230?O5 First interim deficiency rept re inability of BE breakers to
uithstand design impulse levels, Caused by possible problem
in 4*>.>mbly at breaker bushings. Circuit breakers uill be
returned to CE
HIL1-Q, L M T»nne*aee Valley Authority BO/O7/1B app
H General correspondence
6007290091 Responds to 770433 request for Info rB nuclear energy
Radiation doaes from pouier plants IE small fraction of dose
from natural environ sources FEB eicerpt & White Mouse
HQQ312 message to Congress end
DENTONi H R Office of Nuclear Reactor Regulation. Director
BO/0£./27 IBps
0 Inspection reports. IE Bulletins. 3i
fl0072AOOE9 Forwards IE Info Notice- BQ-SQ. "Loss of Decay Heat Rapnoval
Capability at Davis-Basse Unit 1 While in Refueling Made •"
No response required
O'REILLY, J P Raoion 3, Atlanta, Office of the Director BO/05/QB
6007730387 Foruittrds revised final deficiency rept re potential to
overload containment cooling lys pump discharge nonles
MILLS.L M, Tennessee Valley Authority 60/O7/1B lp.
— B007230S91 Revised final deficienci) r»pt re potontlal to overload
containment cooling 9U« pump di»ch«i-g« nonlen. Design
Modified by replacing some grid supports w/»nubbers Supports
ultl be properly installed as required by £01305
* Tennessee Valley Authority BO/07/10 to
BOO 7 3906 10 Second interim deficiency rept re defective reactor vessel
upper internals guide tube support pins Uestinghouse hat not
completed evaluation of pins taken from operating plant
_ Hut r«pt uiilt be forwarded by 8O0911
O'flElLtV.J P Tennessee Valley Authority BO/O7/S4 lp
6007210468 Foruarda IE Circular 80-13, "Brid Strap Damage in
HeBtinghouse Fuel Assemblies " HD written response require*
O'REILLY, J P Region S, Atlanta, Office at the Director 60/05/20
IP
9007010235 Foruards IE Info Notice 80-53, "Loss af Buctlqn to Emtrgency
FeeduatBr PumpB " Mo written response rei.uireit
O'REILLY, J P Region 2. Atlanta. Office of the Director HO/05/B1?
IP
fl007220039 Forwards IE Infa Notice HQ~2fi, "Evaluation of Contractor
QA Projriims " Nn written response required
Q'REILLV.J P Region 3. Atlanta, DFfica of the Director 80/06/10
3pp
DOCKETED ITEMS
OO716O2B7 Forwards IE InFn Notice BO-27, "DegrsdcitiOTi of Reactor
Coolant Pump Studs " No sp*ctf]c jctian DT response
raqui rid
0'RE1LLV,J f Region 3. fitlanta, Office of the Dtrector
lp
3073503B4 forwards IE Info Notice BO-SB, "Prompt Reporting of Info in
Accordance K/10CFR5O 5S(e> " No written response required
D'REILLV.J P Region 2. Atlanta- QFFiee of the Director 00/06/13
3pp
— HQ07170525 First interim deficiency rept re cutting Of conduit tup ports
u/o cutting re 1 oast? Invest! qati on underlay Add! Info
Bipecled by 30QB39
• Tennessee Valley Authority BQ/Q7/11 lp
B00717059I Fourth interim deficiency rept re incorrect analyiii of
total temp range far essential raui coaling water piping
Incorrect analysis confined to piping in auxiliary & reactor
bldgs Neu thermal analyses underway
MI!_LS,L H Tennessee Valley Authority SO/07/11 Spp
O703O37J Forwards IE Circular BQ-13. "Loss of Reactor Coolant Pump
Cooling t, Natural C n c ulat 1 on Coolduun " No written response
required
O'REILLY.J P Region 3, Atlanta. Office of the Director BO/OA/2O
60072 30 'IS 7 Second Interim deficiency rept re inadequate documentation
for ml seel laneous mechanical equipment Applicable QC
procedures written or revised Co Include omitted equipment
Available documentation to be reviewed for further action
MILLS, L M TennesBBH Valley Authority HO/O7/13 lp
07170070 Forwards IE Circular 80-14, "Radioactive Contamination of
Manl Demineral i i ed Water Sya & Resultant Internal
Contamination of Personnel " No written response required
TREILLY, J P Region S, Atlanta. Office- of the Director 00/06/34
IP
GOO72305OS First interim deficiency rept re inability of OE br*»lrer» to
withstand design impuJSB levels Caused by possible problem
in assembly oP breaker bushings Circuit breakers will be
returned to GC
MIILS,L H Tennessee Valley Authority BQ/07/1B, 3pp
D733Q2B3 Fdrurards JE Bulletin 90-16, "Potential Misapplication of
Inssmount tnc tfodels 115.1 fc 1 1 3-2 Pressure Transmitters
'/Either A or D Output Codes " Written response required
IE Circular BO-id also end No written response required
''REILLV.J P Region S, Atlanta. Office oF the Director BO/Q6/3;
P
17210036 Forwards response to IE Bulletin BO-OB re-eiamjnj tion of
ontainment liner penetration welds Penetrations at
aquuijah, Watts Bar t. DelleFonte contain Flue* head design
esign for Yellau Creek not get completed
1LLS.L M Tennessee Valley Authority 9O/O7/OB Sjip
7170372 Responds to NRC 300617 Itr re violations noted in IE Insp
Fpts 50-390/BO-lfl & 50-391/BO-1O Corrective aictiDTts weld
'ocedure changed to allow use of 1 /9-inch filter metal For
lot pass & inspectors instructed to folloui instructions
ILLSiLH Tennessee Valley Autlorittj 3D/O7/10, 3pp
8007230597 Foriuards revised final deficiency ropt rt potential to
overload containment cooling sys pump discharge nozilp!
MILLS.L H Tennessee Valley Authority 8O/07/1B lp
— 9007230591 [leviaed final deficiency rept re potential to OVorloid
containment cooling ays pump discharge nolilBS, Deitgn
modified bg replacing some grid supports ui/snubbsrt Supporti
will be properly installed fls required by Q01S03
* Tenneseec Vail BIJ Authority 80/07/18 lp
8007290610 Second Interim deficiency rept re defective reactor votxl
ujiper internals guide tube support pins HBS tinghous* has not
completed evaluation of pins taken from operating plant
Neit rept mill be forwarded by O0091I
a'REILLY, JP Tennessee Valley Authority BO/07/24 lp
V Operator Eiaminations
leportable occ urrances, LERs & related correspondence
020619 Flftfi interim deficiency rept re re-fueling uatar storage
infc overfloiu lino not Fabricated to A9ME code Pittsiurgh-
s Mninos Steel Co fi TV A disrutBing repairs Me it rept tuj 1 1
provided by BO09Q5
LLS.L H Tennessee Valley Autnoritij BO/Oi/lB lp
16O971 Faruiards final deficiency rep(
ntrlfugal charging pumps
-tB,L H Tennessee Valley Authority,
re chemical & vol control my*
BO/06/1S lp
3716057B Final deficiency rept re potential for degradation of one or
nore chemical & vol control nys centrifugal charging pumps
Jesign t< plant emergency operating procedures Mill be
nod i Pied' as recommended lit/ Mestinghouie
Tennessee Valley Authority ao/06/IB Spp
7O6i4 part SI final rept re West ingji ouse chemical It vol control
centrifugal charging pumps Following secondary side high
rgu line rupture !< associated reactor tripimin flow may
be "te-t Emergency operating procedures modified
LB,t- M Tennessee valley Authority BO/Oi/JB 4pp
7023E Second interim deficiency rept re radiation qualification of
etij-re lated cables enc 1 in conduit inside c ohta in-men t
1 continuing to invest! gjte Rept if * tailing results of
luation t< corrective actions expected by B00919
-S.LK Tennessee Valley Authority 80/07/01 lp
10433 Forwards First interim deficiency rept PB insufficient
ysis of 3-incJi Ftre protection lines Mill submit next
tiy SOQ9O2
S.L M Tennessee Valley Authority 80/O7/03 lp
110437 First interim deficiency rept ra jnsuf Ftclent analysla of
inch Fire protection lines Layout drawings did not provide
ffitfent dimensions Three-inch fire protection lines, uii 1 1
rigorously analijiBri ft supports Mill be adifed
Tennes.see Valley Authority SO/07/O3 lp
)313 Forwards first interim deFicicncy repl ro tutting of conduit
orts Li/a cutting release
,L H Tennessee Valley Authority £10/07/11 lp
BOO7oao3E)a Notifies tnat response to NRC 800603 Itr rtt operator
training uas submitted in JR Calhoun QOOfllA Itr to P
Collins
MILLS, L M Tennessue Valley Authority 8O/07/OI lp
DOCKET 50-393 VIRGIL C SUHMER NUCLEAR STATION. UNIT t
A AppHcatlon/conatructlon stage documents Et correcpDndinc*
BOO7O30D61 Summary of 000613 meeting u/util re (truttural &
geotechnical engineering reviaui ut/emphasi< on ivc uiatar
intake structure
HOUOrirGN, T C Licensing Branch 3 BO/Oi/33 3pp
800714028? Notification oF B0070H-1O meetinB U/utU in ColUfflbla.BC
to revieu qualifications of util to operate plant Llit of
agenda items end
F Licensing Branch S 80/06/26 Spp
BOQ73300QI Fofiaaris statement of policy re requirement* to be Met for
current OL appl ications, as derived From NUREQ-06&0 fc found
in NUHEG-06-J4
EIBENHUT, D « Division of Licenaino 00/06/26 Spp
BO O7 16033 4 Forwards request for attdl info in connection u/NRC review of
OL application Info covers areas of mails eng ineerinff.
secondary uater chemistry control !< seiamotogy Seltmologu
questions replace those numbered 361 IS to 961 19
SCHUENCER, A Licensing Branch 3 BO /Ob/30, 14pp
8007230633 Forwards std order fov DOE uork
MrtTTBOM.fi J Division of Safety Technology
BD/Q6/30 3pp
FIN A-llai-0
— BOO7330A52 fitd order for DDE uiork ''Revieu of Au>illacu F»etfU*ttr Sy*
Relinbllitj Evaluation Studies for Diablo Canyon 1.
He Quire l. Summer 1 b Ban Onofre S & tCC3 Reliabilitg
Analysis of Manual vs Automatic " Issued to Sandla Labi
OnENien.B L Division of Safety Technolpoy FIN A-1121-0
BO/06/a? 9pp
B007O900I1 Notifies that tun Uestlnp,house pUntu u/reactor vnciel
internatB similar to FaciJi ty, have etperienced fuel rod
damage due to uater jetting through reactor vessel louer
Internals baFPle gsps Notes Hestinghouse recommendation
CREWS, E H South Carolina Electric b Oaa Co BO/07/O1 Spp
245
B007OaO393 Notifies of delay In response to NRC BO061B Itr on undercUd
cracking in reactor vosael noiilex Westinghouse info ulll
not b« available for appro) 3 ulca
:REWB,E H South Carolina Electric K Gas Co SO/07/02 Ip
BOQ71602S2 Forwards addl info re svc water Intake structure in response
to NRC BOO623 request AIL load combinations b loads
spociflod for reinforced concrete strength design satisfied
CREWS, F 14 South Carolina Electric t, Gas Co BO/07/03 6pp
00Q7170607 Forwards response to NRC 000630 Itr u/questions re secondary
uater chemistry control program F8AR amend will be filed in
AuB 19BO
CREWS, E H South Carolina Electric & Gas Co BO/07/14 lipp
— BOO 7 1706 12 "Chemistry Procedure CHP-612, Qut-Df-Spec Handling &
Reporting," Revision 0
LEACH, F J i CRDLEV, 0 0 South Carolina Electric & Qas Co
SO/O3/27 17pp
B007EB0428 Forwards May 1980 status rapt re NUREQ-Ofi&Q t, NUREQ-0694
CREWS, E II South Carolina Electric & Qas Co BO/07/ IB 70 pp
S00723030B Forwards "Environ E«po»ure of LDHJ Voltage Power Cable, " to
luppl meponse to FSAR Questions 31 71-73 fiept withheld
(ref 10CFR2 790)
CREWS, E H Sooth Carolina Electric; b Das Co 60/07/21 Ip
6007290491 Forwards Drawing R31EB0290, Sheets 1-9, in reaponso to FSAR
electrical Question SI 67. Drawings withheld
traf 10CFR2 790)
CflEUB.E H South Carolina Electric & Oas Co BO/07/21 Ip
C Utility Environmental Report (ER), amends b correspondence
BQ07Q9024B Re^upsts Inf.i tn tie provided ulthin 10 days, in response to
Commission B00630 order, CL1-BO-2B Request doos not rElieve
rocipionts from compliance u/order Response must include
competitive status since Dec 197S fc latest annual rept
CHANAN1A.F D Antitrust Division BO/07/OB 2pp
B0070TO253 Requests info to be provided luithin 10 days, in reaponso to
Commission 8000630 order, CL!-aO-Sa Request does not relieve
recipients from comp 1 lance u/ordBr Rpspan^e must include
conpetitive status since Dec 1970 t, latest annual i apt
CHANAMA.F D Antitrust Division SO/07/OB Spp
B0072504B9 Motion for 20-day ei tension to file comments
DEENY,S T Central Electric FIIUOT Conperat i ve. Inc DEENY, 3 T
Brand E, Hall BO/Q7/24 2pp
— B00725O50P Affidavit stating that Brand !< Hall has received 10O, OOO
documents frnm ^r Eluctnr !. Gas Co Many dorumBnts relata
to NC t. EC caoes t< may include inconsistent info Certificate
of Bvc enc 15
DDAND, W E Brand 6 Hall 80/07/23 4pp
BOQ731O134 Desponds to B007OB tBoUEBt For info re BQOi>30 mcmorandom
I. ordEr Discusses Bt, Clectric ti Has Co competitive
relationship ui/Central Electric Pnuer CooperatiVBi Inc
Correspondent e encl
CONNER i T n Conner, Moore & Corber BO/O7/2B 7pp
0 Inspection reports. IE Bulletins
correspondent!
B007210220 Forwards IE Info Notice BO-3Q, "Loss of Decay Hflat RBmoval
Capability at Davis-nesse Unit 1 While In Refueling Made "
No responoo required
Q'HE1U.Y,J P Region 2, Atlanta, Office of the Director BO/05/OB
IP
8007070267 Foruards Amend 9 to environ rept Certificate of Compliant
•n cl
CREWS, E H South Carolina Electric t, Oat Co 80/07/03 4pp
— 8007070270 Amend 5 to environ rept
* South Carolina Electric & Oas Co
BO/06/30 2ipp
F Security, medical, emergency b tint protection plans
G007240222 Foruarda IE Info Notice QO-20. "Laos of Decay Heat Removal
Capability at Davls-Besse Unit 1 Wliilo in Refueling Made "
No VefiponaE requirBd
O'REILLY, J P Ragion 2. Atlanta, Office of the DirpEtor BO/09/OB
Spp
B007030170 Foruards IE Info Notice BQ-32, "Droakilouns In Cojitamlna tinn
Control Programs " No written response required
O'REILUY.J P Region 2, Atlanta. Office of the Director HO/05/SB
6007090030 Notification of S007S2 b 23 meetings ui/util in Jenfc insvil lo,
BC tn roviuui facility emergency planning
HQUGHTON, T C Licensing Branch 2 BO/06/23 3pp
BO 07220390 Forwards Revision 1 to facility radiation emergency plan
CREHQ.E H South Carolina Electric b Gas Co BO/07/ IB Ip
— BOO7230392 Radiation emergency plan, Revision 1
* South Carolina Electric b Oas Ca 80/O7/JO 200 pf>
B007020171 Foruarits IE JnFo Notice BO-22. " Breakdowns In Contamination
Control Progi ama " No uritten recponso required
O'REILLY, J P Reginr, 2, Atlanta. Office oF the Directgr aQ/05/SB
BOO7210471 Forwards IE Circular BO-13, "Orld Strap Danaoe in
Mastinghouse Fuel Assemblies " No uritten response required
0'HEILLY,J P Region 2, Atlanta, Office of the Director BO/0&/SB
B0073906SI, Foruardi "Evacuation Time Estlmateai " in response to NRC
B0070H request
CREWS.E H South Carolina Electric b Oaa CD 00/07/24 Ip
— B00729Q637 "Evacuation Time Estimates " Lei ington, Falrf 1 eld b Neuberru
Counting, BC commpnta encl
* South Carolina Electric it Gas Co BO/02/ 2i lOpp
0 Adjudicatory correipondence
8007310343 Foruards Commieiion B00327 memorandum b order containing
decisions on UCB 7B050H petition For reconsideration of
760413 memorandum b order. UCB 771104 petition sought action
r* flra protection for alectrica] cables
EIOENHUT, D 0 Division of Lieenaing BO/06/29 B9pp
M Antitrust corroapondBnce
B0070Z0997 Hioiorandum ti order letting forth facts re General Electric
Power Cooperative petition For significant changes
determination under Atomic Energy Act, Requests Atty General
assistance for final determination.
CHILK.B 0 Office of the Secretary of the Commission BO/06/30
B0072104V2 Foruards IE Circular 00-13. "Grid Strap Damage in
Ueatinghouse Fuel Assemblies " No uin ttun rosp ana e required
O'REILLY, J P Region S, Atlanta, OFFicE of the Director BO/09/3B
IP
6007010242 Forwards IE Info Notice 80-23, "Loss of Suction to Emergency
Feeduater Pumps " No written response required
O'REILLY.J P Region 2, Atlanta. Office of the Director 00/03/39
»P
B0070102fla Foruiards IE Info Notice 80-23, "Loss of Suction to Emergency
Feeduater Pumps " No ujntten responsp rrquircd
O'REILLY. J P Region S. Atlanta. Office of the Director BO/0&/B9
8007220017 Forioflrds IE Info Notice BO-SI,. "Evaluation pf Contractor
OA Programs " No uritten response required
O'REILLY. J P Region 3. Atlanta. Office of the Dir-Bttor 90/06/10
Ip
B0072200B3 Forwards IE Info Motice 00-26, "Evaluation of Contractor
OA Program 5 " No uritten response required
O'REILLY.J P Region 2. Atlanta. Office of the Diroctpr BO/06/1O
Spp
B007090SS3 Requests info to be provided uiithin 10 days in response to
CoMntssion BOD630 order. CLI-BO-38 Hequest dots not relieve
recipient from compliance u/order. Response must include
competitive status since Dec 1978 b latest annual rept
CHANAN1A.F. D Antitrust Division. BO/07/OB 2pp
B0071602S1 Fnruards IE Info Notice BO-27. "Degradation of Reactor
Coolant Pump Studi " No specific action or response
required
O'REILLY.J P Rooion 2, Atlanta, Office oF the Director, BO/OA/11
246
BQ07250378 Forwards IE Info Notice BO-2B, "Prompt Reporting of Info In
Accordance W/IOCFR50 55<B) " No untten response required
O'REILLY.J P Region 3, Atlanta. Office of the Director
3pp
60/06/13
BOQ72503BO Forwards IE Info Notice BO-SB, "Prompt Reporting of Info in
Accordance W/10CFR50 55<e> " Wo untten response required
O'REILLV.J P Region 3. Atlanta. Office of the Director BO/04/13
2pp
8007030741 Forwards IE Bulletin SO-15. "Possible Lofls of Emergency
Notification 5ys (ENS) H/Loss of OFfaiti' Power " Written
response required „„,„,,,„
O'REILLY.J P (legion 3. Atlanta, Office of the Director BO/06/1B
IP
80O7O2Q74B Forwards IE Bulletin SO-15. "Possible Loss OF Emergency
Notification Sye (ENS) W/Loss of Offsite Power " Written
response required
O'REILLY.J P Region 3. Atlanta, Office of the Director BO/O6/1B
IP
8007O2Q381 Forwards IE Circular SO-15. "Loss of Reactor Coolant Pump
Cooling & Natural Circulation Cooldoun " No written response
O'REILLY.J P Region 2, Atlanta, Office of the Director 0O/Q6/20
IP
6007010439 Supplement 3 to Part 21 rapt re fat lid thruit bearing. Itinp
complete Crankshaft thrust bearings an tun die»»l 0*nerator0
are free of reported potential defect
MORIARTViJ M Colt Industries. Inc . Fair-bank* More* Engine Dlv.
BO/06/36 lp
0007010397 Deficiency rept re passible Improper rocker nrfl prelub* pwa
operation Pump could fail to start as result of hydraulic
lock in cylinder Instituting further review of othir
installation electrical schematics t. instruction manual*
MOR1ARTY.J M Colt Industries, Inc , Fairbanks Hone Engine Dlv.
BO/06/27 Spf
6007250457 Final deficiency rept re diesel generator preliiba oil 9H"9
continuous operation Pump controls will be reviled to
operate for short period of time each day Length at tine
to be determined by mfg
CREWB,E H South Carolina Electric I, Oat Co BO/07/21 4pP
DOCKET 80-376 UNIV OF VIROINIA CAVALIER REACTOfl
F Security' medical, emergency b Pirn protection plant
B007210427 Forwards physical security plan fc proposed chongo* to Tech
Specs Plan withheld (ref 10CFR2 79D)
BHR1VER, D L Virginia, Univ of fld/07/19 Spp
80070203B4 Forwards IE Circular SO-15. "Loss of Reactor Coolant Pump
Cooling fc Natural Circulation Cooldoun " No written response
required
O'REILUV. J P Region 2, Atlanta. Office of the Director BO/06/20
IP
8007160701 Forwards IE Circular 80-14, "Radioactive Contamination of
Plant Demineralned Water Sys & Resultant Internal
Contamination of Personnel " No written response required
O'REILLY.J P Region 2. Atlanta, Office of the Director BO/06/24
IP
B00716O704 ForuiarS* IE Circular BO-14. "Radioactive Contamination of
Plant Demineraliied Water Sus !. Resultant Internal
Contamination of Personnel " No written response required
O'REILLV, J P Region 2, Atlanta, Office of the Director BD/06/24
8007180356 Ac ft receipt of IE Insp Hept 50-395/80-14 Wo proprietary
info
JOHNSON. M C South Carolina Electric b Gas Co 90/06/24 lp
— BOD7180365 Forwards IE Insp Rept 30-395/BO-14 on Q00513-li No
noncompliance noted
MURPHY. C E Region 2. Atlanta. Reactor Construction & Engineering
Support Branch BO/O6/04 Spp
— BQ07180375 IE Insp Rept 50-393/80-14 on 600513-16 No noncompl lancB
noted Major areas inspected instrumentation cables
termination umr!t & work activi ties, termination quality
records, elec trical components It sys quality records
CONLDNrT E Region 2. Atlanta. Reactor Construction (. Engineering
Support Branch uIBBONB, T D , MERRIWEATHER, N Region 2, Atlanta.
Office of the Director BO/06/04 ipp
8007330319 Forward s IE Qulletln 90-16, "Potential Misapplication of
Rosenount !nc Models 1151 It 1152 Pressure Transmitters
W/Either A or D Output Codes " Written response renuind
IE Circular 00-16 also encl No written response required
Q'FIEILLY. J P Region S. Atlanta, Office of the Director 80/06/27
B007230217 Forwards IE Bulletin 80-16. "Potential Misapplication of
Ftosemount Inc Models 1151 & 1152 Pressure Transmitters
H/Either A or D Output Codes " Written response re/quired
IE Circular BO- 16 also encl No uritten response required
O'REILLY, JP Region E. Atlanta, Office of the Director SO/ 06/3
lp
>onse to IF. Bulletin BO-OS Action Hems 1 &
D plant atmosphere or
lines Size of vent
2pp
— B007210433 Tech Specs 3 3,4 1,4 2. 4 8,6,2 t 6 3 r» iafit|| Haiti,
Unit Ing conditions for operation & surveillance
requirements
« Virginia, Unlv of OO/O7/15 Vpp
3 Inspection reports, IE Bulletins & correspondence
B00717Q173 Forward a IE Circular BO-14, "Radioactive Contamination of
Plant Demlneraliieri Water 8ys & Resultant Internal
Contamination of Personnol " No written response requlrarf.
O'HEILLV, J P Region 2, Atlanta, Office of the Director 90/06/24,
IP
DOCKET 50-397 WPPSB NUCLEAR PROJECT, UNIT 2
A Application/construction stage documents & corretpandincB
B007O30196 Forwards organiiatlon charts for Oft at Nuclear Reactor
Regulation effective 80O42H States means of appeal of ataff
position
TEDESCO, H i. Assistant Director for Licensing BO/06/12. 2ff
8007010002 Forward B drau>ing« In respon«e to Round On*i8et
Quofltlons 031 104 !< 031 109 Control room patieli ravitton
status sheet encl
RENBERQEFi.D L Mashington Public Pouiir Supply 8g«t«m SO/OA/16.
app
™ H007010004 "RadUBste t< Control Bldg Elevation* 901 Ft & 907 Ft. Lighting
Plan "
* Burns Si ROD Co 79/1H/11 lp
— H0070I0007 "RaduiBEte & Control Dido Elevations 301 Ft fc 907 Ft, Pawl*
Conduit ti Tray Plan "
* Burns b Roe Co BO/04/ li lp
— B00701001B "Raduaste t Control Bldg Elevations 501 Ft fc »7 Ft,
Instrumentation & control Conduit & Tray Plan " Sheet 1
» Burns fc Roe Co BO/06/11, lp
-- B007010021 "Raduaste t, Control Bldg Elevation* SOI Ft fc B07 Ft,
Instrumentation & Control Conduit b Tray Plan " 9ha*t 2,
* Burns & ROB Co BO/06/12 lp
—8007010023 "Raduiaste Si Control Bldg Elevations 501 Ft li SO7 Ft.
Instrumentation 8< Control Conduit $ Tray Plan " Bh»»t 3
» Burns b ROE Co BO/04/16 lp
—BO 070 100 32 "Raduisste & Control Dido' Elavati orls 501 Ft fc SO7 Ft.
Instrumentation fc Control Conduit ft Tray Plan " Bh»»t 4.
* Burns b Roe Co 80/03/06 lp
-B007010033 "Raduaste !. Control Bldfl Cable Tab leu, Instrumentation I.
Control Conduit *( Tray " Sheet 1
• Burns It Roe Co BO/03/O6 lp
3pp
-8007010039 "Haduaste ft Control Bldg Cable Tabl n- Jn*trum»nt«tioi> fc
Control Conduit It Tray " Sheet 2
* Hums & HOB Co 79/12/06. lp
DOCKETED ITEMS
247
— BQ0701Q041 "RaduiastH & Control Bldg Cable Tables, Instrumentation fc
Control Conduit b Tray " Sheet 3
* Duma ti ROD Co BO/03/24 Ip
— B0070I0043 "Radwaste t, Control Dldg Cable Tables, Instrumentation «•
Control Conduit & Tray, " Sheet 4
« Burnt & Roe Co 00/03/34 Ip
— - 8007010049 "Raduiaste & Control Dldg Cable Tabl si, Instrumentation t,
Control Conduit b Tray " Sheet S
» Burns & ROB CD 80/03/34 Ip
— Q00701O092 "fiadwast* & Control Dldg cable Tables, Instrumentation 6
Control Conduit t Tray " Sheet 6
» Burni fc Rot Co BO/03/H4 Ip
— -B0070100S4 "RaduattB b Control Dldg Cable Tables, Instrumentation &
Control Conduit !• Tray " Sheet 7
* Burns t Roe Co 8O/O3/12 tp
— BO07010OSB "Raduaste h Control Dldg Cable Tab 1 es, Instrumentation t
Control Conduit & Tray " Ghent a
* Burns fc Rod Co 80/03/11 Ip
— D007010099 "Radwaste & Control Dlilg Cable Tables. Instrumentation t<
Control Conduit fc Tray." Shoot 9
* Burns b Ron Co BO/03/11, Ip
-- -8007010061 "H»dua»U b Control Bldg Cable Tables, Instrumentation b
Control Conduit b Tray. " Sheet 10
* Burn* tc ROB Co, 80/01/03 Ip
— DOO7O100M "R»duast« ti Control Bldg Cubit Tables, Instrumentation t<
Control Conduit b Tray " Sheet 11
t) Burn* ti ROB Co BO/03/24 lp
— BO070 10069 "fladuaata fc Control Bldg Control Room b Remote Shutdown
Roan, Arrangements. " Sh*Bt 1
* Burni * Rot Co, BO/01/ 11 lp
800717O339 Notification of B0070C meeting id/DHH licensing review group
In BethestfaiMD to disiuss consensus positions oil Reactor Bys
Branch open issues Meeting rescheduled For 600707
WILSON. J N Assistant Director fnr Licensing RO/O7/03 lp
--B007170347 Notification of 900732 meeting u/BHR licencing review group
in Bethesda.MD to discuss THI issuer, required for OL
issuance
WILSDN.J N Assistant Director fur Licensing BO/07/O3 lp
— 8007170331 Notification of BQ07SA meeting. u/BUR licensing review group
in Belhesda.MD to introduce BUR licensing review gi-oup >i
present consensus pontions for Poujer Sy Branch, Conta i nment
Sus Branch t. Equipment Oual i Ficati on Br-amh
WILSON. J N Assistant Director for Licensing eO/07/O3 9pp
B007230621 Summary of S00612 fneetlnB ui/Mftrk II DuinHrs group in
Bpthesda.MD re lead plant closure !• long-term program Mods
should be made to nener'c 'ead plant condeniation
oscillation & chugging pool boundary loads Vlougraphs entl
ANDERBON, C J Gononc Issues Branch BO/O7/03 57pp
B0071506BO flonuears meeting u/NRC to discuSi containment hudrodynamic
loads & chugging data becoming available from flTCQ tests
RENBERQER.D L Uashingtqn Public Power Supply System BO/O7/10
2pp
8007230391 Forwards ropts referenced in NRC B00602 Question 3iO O03
RENQEROER.D L Washington Publir Pouier Supply System BO/07/11
3pp
— -B007230399 "Evaluation nf Faulting in Warn Spring Canyon Area 3outheait
UAi " Dei. 1979 Ovcrsiie drauiinga end Prepared for MA Public
Pokier Supply Sys
FAROQQU1.SH Shannon t> Ml laon. Inc 79/12/31 SBpp
— B007330396 "Opo logic Reconnaissance of Wallula QdpiHA - Blue Mountains
- LaOrande-DR Rngion," Dee 1979 BversiiE drawings d map
encl Prepared for MA Public Power Supply Bys
KIENLE.C F , HAM1LL.M L , CLAYTON, D N Shannon !< Wilson, Inc
79/12/31 91pp
— B007010O73 "Raduast* ti Control Room Arrangs merits Elevation 467 Ft "
Shoot 3.
tt Burn* ti ROB Co. 00/03/24 lp
— B00701007A "Balance of Plant Remote Shutdoun Board IDD-R5) " Sheet RSI
of RSS
» Burns fc Ftoe Co 7S/Ofl/Oa lp
— 90O70100B3 "Balanci of Plant fl.mote Shutdoun Hoard (BD-RS) Ligend "
BhBBt RB3 Of RBH
» Washington Public Power Supply agstem 77/06/50 lp
— B007010OVO "Engraving RB«ote Shutdown VB "
* 0»n«r«l ElBctric Co 75/06/30 lp
— 0OO70 100*72 "Cablo Routlnfl Code Diagram "
» Oantr»l Eltctrlc Co, 79/O7/30 Iff,
--BO07010079 "Engraving'rlefiiotB Shutdown VB
n Banoral Elnetrlc Co 73/03/13 lp
-HX>0701009B "RBfflotB Shutdoun VB "
<t O.neral Electric Co 75/12/15 lp
B007030239 Notification of 0007013 meeting u/DWfi licensing revinu group
In B*bhB*da,HD to discuss connensun position on reactor
*vc bldg opBn iisu*
HILfiON, J. N Licensing Branch 1 BO/Oi/lB 9pp
S007010297 Bummary of 800613 meeting ui/utiU, HMCi Inc, QE, Bechtel.StW d
S«rfl«nt fc Lundy In Bothesda. MD re consensus positions on
rvactor *VC bldp tt isolation cooling BIJB bldg open issues
from La 8«lle dockBt. StatU* repta encl
HILSQN, J N Aaslatant Director for Licensing OO/Oi/19 46pp
6007330001 Forward* statemont of policy re requirements to ba met for
current OL applications, a* derived from NUREO-OfidO t> found
In NtMEQ-0674
EIBENt1UT,D 0 Division of Licensing 60/04/36 2pp
-1)007350399 "Geologic Evaluation of Selected Faults *< Lineament i. Pasca t>
Walls Hslla Basins, WAi " Hay 1900 dvursiic drawings encl
Prepared fnr WA Public Powor Supply Sys
FAROOClUIiS hi , THOMAS, R E Shannon b Hi 1 son, Inc BO/ 05/31 45p(i,
-BQ07S5Q400 "Set Hmol ogical Flovieu of 360716 Mi Iton-Freouater Earthquake
Source Region," Jan 1930 Prepared for Uft Public Pouer Supply
Bye
it Uooduard -Clyde Contul tantn. Inc BO/OI/31 A4pp
— 8 0072 DO 4 02 "Recent Stfi amic i ty of Hanford Regioiii
MA Public Power Supply Sys
« Woodward-Clyde Consultants, Inc 80/OB/a9
Teh I960 Prepared for
<?Bpp
— 80072 304 03 "Pal eomagneti sm !. Age Dating," Jul 1975 Prepared for United
Engineers & Construe torfi, Inc
* Woodward-Clyde Consultants. Inc 7S/O7/31 53pp
3007310409 Responds to Round Bne Questions, Set 9, Questions 211 04? -
311 106
RENBERQER.D L Washington Public PoUier Supply System BO/07/ H
167pp
B007al0393 Acl receipt of NRC 800430 1 tr approving request to
discontinue certain aquatic monitoring & requesting copies
of utll submittals to Btate of HA re water quality NftC duet
not have authority to require water quality filings
HENBERGEII.D L Washington Public Pouci- Supply System BO/07/J4
3pp
8007330133 Notification of B0072S rousting u/DHH - Licensing Review
Group in Bethesda.MD to discuss concensus positions op
BWR - Licensing Review Croup un ICBB open issues
HILSONi JN Licensing Branch 1 80/07/16 JQpp
8007310447 Confirms B0071B telcon re adequacy of wnrh control Si
QA syc of mochanirfll contractor Hnght Schuchart. Harbori
Boecon,OERI LiLensce stop uiorJi directive will remain in
effect until NRC has examined re-evaluation
ENGELKEN.R H Region 5, San Frantifico, Office of the Director
90/07/18 lp
8007160311 Forwards comments re adequacy of Bits archaeological
Investigation! & Bonneville POIUBT Administration survey t<
mting along Asche-Slott tranamiBsion route
CQftDDNtO J Intnrior.Dapt of 80/07/03 3pji
DOCKETED ITEMS
Adjudicator^ tnrrospnndenc
'73IO24J Foruiartls Ccmminaicn 900537 memorandum h order containing
eciEions on UCb 7BO902 petition f-ar recons j deration of
BQ413 memorandum d order UCS 7711CW petition sought action
e fire protection Fai electrical cables
IBENHUT.D G Division of Licensing 80/06/25
Inspection reports, 7E Bulletins !.
I723O3S4 Responds tn IE Bulletin BO-O3, "Loss nf Charcoal from Std
gpe 11.2-Inrh Tiay Adsorber Cells " Visual insp of ndiorfcer
ells tube m&talled in control mom emetgency filter units
ot possible 5inte delivery has nut been made
EW3ERGER, tl L Washington Public Power Supply System DO/03/1S
80O723061B Ac h receipt nf BOO305 b Oil 1 Itrs informing NRC of «tep»
taken to correct violations noted in IE Investigation Rept
B 0—397 /7?~1O
SPENCER, G S Region 4, Dallas, Reactor Construction & Engineering
Sup-port Branch BQ/07/O9 Ip
— HOO7230623 Forwards revised response to violations noted In IE
Investigation Hepl 50-397/79-10 Transient analysis indicates
matl adjacent to ueld !< under heating blanket uero not
eicessively overhea ted
RENBERQERjD L Washington Public Pouer Supply System SO/06/11
2pp
— 300733(1621 Forwards IE Investigation Rept 30-397/79-10 on 790317.O329-
0601,11-11 & O910-14 & notice of violation
SPENCER, G S Region 3, San Francisco, Reactor Construction It
Engineering Support Branch BO/01/21 2pp
723QOO3 Responds to IE Bullotin BO-03 Marvin Engineering Co did not
tijiply internal f peduatoT spfirgere or tnermal sleeves for
cactor pressure vessel at Unit 3
ENDERGEH.O L Washington Public Pouer Supply System BO/04/2B
-0QO723063H Notice of violation from insp on 790517,0929-0601,11-14 t
0910-14
* Region 5. San Francisco, Office of the Director BO/D1/21
3pp
7HOO97 Responds to S Meyers BOO3J-) ]tr to lenator Magnuson re
Drown allegations dealing u/OC Results of Investigation
(•viewed m/Oroun on BOOB37 Since entb inspector irai) lonk at
arlous code aspects. findings nag differ
TELLO, V Office af Inspection !t Enforcement, Office of the
Iroctor 90/05/O5 Ip
~BO07a30639 IE Investigation Ilept 9Q-397/79-10 on 790S17, 0539-0601. 11-14
& 0910-14 Noncompliance noted failure to nualify post-ui«ld
neat treatment procedure Procedures for equipment operallons
not provided
BISHOP. T H , HERNANDEZpG Region 5, Ban Francisco, Office of th»
Director DODDB.R T Region 3, San Francisco, Raaetor
Construction !< Etigineoring Support Branch BO/01/21 Spp
007140098 iteaponda to DDE SOOlSt? mEmo to NFIC re R Drouin 790B21 tt O919
Hrs. alleging faulty QC at iitu Reply will be made directly
tn 3rouin upon completion up inuast i gation
SIELLQ,V Office of InEpettlon f, enforcement. Office of the
Qiruttor HO/O2/39 Ip
J07140102 Fnruarrta response to H Urcun 790919 1 tr alleging faulty
QC ot site Inv* atigat i an -determined one allegation havino
no safety siijiiifiCLjncB-.miis subitantlated Otticr alloaation,
having safety a i gnl F i c anc-e. part i al ly imbstnni a ted
DIRCIlfl, U -J Office of the E«ecutive Director for Operations
GO/04/25 EJpp
BOD7310171 Forwards status of flued heud containment psnetration wcldi
in response to IE Hulletin 80-OS Wor* on flued haads covered
ti\) ASME code Completed wold 3 e<>amined radiograph leal lij
Defects re incamplcte fusion I* surface porosity repaired
REMBERSER.D L Washington Public Pouer Supply System GO/O7/10
3pp
Q00731049B Ansiuers notico of proposed imposition up civil penaltit* dtd
BO0617 Majority of Findings reflect deficiencies found bij
contractor, util l< N(?C Region 5 Encl Eihiblt A dfitailB
protBEts against imposition of certain proposed penalties
5TRAND, N 0 Uashington Puulic Pouior Supply SijEtem 00/07/11 SBpp
'140SB7 Forniards IE Pulletin BO-13, "Cracking in Core Spraij
jargera " Nu ujiitten TEsponse required
JQELKCN.H E Region S, Ban Francisco, Office of the Director
V05./12 Ip
6007310S02 Providos response to notice of violation tt requaat for ad<Jl
InPo Outlines short-term, intermediate & continuing phases of
evaluations Supporting documentation encl
STRAND, N 0 Washington Public Pouer Supply System HO/O7/17 36pp
'230352 Forwards 1C Info Motice 80-24, "Evaluation of Contractor
Programs " No written respoiiEe required
IQEUHENi Fi H liegion S, San Franc i s-co, nfflce tif tlie Dlrectoi
/06/JO Ip
M0414 Foruiirdfi IE Bulletin BO-14. "negradflti cm oP BUR Scram
o charge Vnl Capability " No turittort response required
GELKEN.tt H Region 5, Ban Francisco, Office uf the Dirnctnr
i/Ofa/12 Ip
Reponria to IE Bulletin BO-O1 re danage to Lhemlcal vol
ntrcil sijft tank!. Bulletin inappltciible since fncility Is
R nut PWR
NBEHGER,D L Ha-ihinoton Pulj 1 i c Power Supply 'Igstam 00/O6/1H
S9O09O Forwarifa IF-. Info Motite BO-ja, "Prompt Reporting of Info in
cordancc U/IOCFFJ50 TrSCt'} " No written response ren.""'<'d
QEUKEN^R H fleoion 9, Ban. Frontietn, Office of the EMruCtor
/06/13 Ip
FdruiariU EE Circular 00-1S, "Loss of Reactor Coolant Pump
ilinif & Natural Ciriulation Cooldnuin " No written rasponae
qui red
SELHEB, R M f)«glnn 3. San Francisco. Bfficfl r>P the Director
/0&/20 Ip
S Raportable occurrences, LERs & ralated correspundnnce
8007390704 Interim deficiency rept re gaps It voids in sacrificial
shield uall Corrective action plan described in B0062O Itr
Imp 1 emontatl on is pending NRC concurrence
RENBERQER.D L Washington Puhlic Poynr Supply System BO/07/23
2pp
U Congressiorial/Eiecuti ve Correspondence
S007310390 Discusses NRC BOO617 issuance of Escalated EnforcBitnmt Act
in farm of penalty to util Interest enpressed in correlation
between schedulo delays d cost overruns in rest of ind"u«tru
!i financial anangements similar to util
WEAVER, J House af Pep BO/0// 14 3pp
8007300367 Submits questions re unusual Financing arranotmant betuicnn
util if Bonne vi 1 to Pouer Administration Related
correspondence
WEAVER.J House of Hop BO/07/14 2pp
DOCKET 30-400 SHEftRON HARRIS NUCLEflR POWEfi PLANT, UNIT 1
A Application/construction stage documents & correspondence
10039? Forwards IE Circular BO-14, "Radioactive Contamination of
int Bemfn-crnliipi! Water <jij a *. Resultant Internal
itami nation of Personnel " No urttten response required
JELKCN.R H Region 5, Ban Franc i r.co, Offiue of the Director
06/34 Ip
B007OB0427 Foruiartfs computer magnDtic tape of onslle (neteorologtcal
data supporting FEAR Submitted in format described in
DB Vossatlo 790310 Itr Format description t< tape dump of
first 65 records encl Taps available in Central Files onlu
MCDUFF1E,M A Carolina Pouier t, Light Co 80/06/26 ISpp
J30-1O1 Foriuards IE BullHiin BO-1A. "Potential Misapplication of
, amount Int Mndpls 1191 A IIS? Prosaure Transmitters
i ther A or D Outp-ut Ooifo^ " Written response reo,ulred
Circular BO- 1 A j ] so "ne I No written response required
ELUEN.R H Uogion S. 9an rranciico. Office of the Director.
'06/27 Ip
B007170638 Forwards FSAR,yols t-30, amended 01. application d environ
rept for OL stage OL application only end
JOMESj J A Carolina Peuflr !i Light Co BO/06/26 3pp
— BOO717O439 Application for OL Annual Financial repl t, prospectus end
* Carolina Pouier fc Light CD BO/04/S6 99pp
BQ0723OOO1 Forwards statement of policy re requirements to be met for
currant DL appli cations, as derived from NUREG-0660 It found
in WHEO-0694,
EISEMflJT. D 6 Division of Licensing BO/Ofo/26 2pp
8007190935 Requests clarification of ANSI N45 3 10 as invoked by Reg
Quido 1 74t*> to whether ar not certificates of conf ormanc«,
carilficatei of compliance l< certified test repts muit
contain longhand signature
MCDOFFIE, M A Carolina Powor Si Light Co BO/O7/09 lp
BOO 72204 36 Forwards schedules of const milestones b activities as of
800&3O Hilestonn network schedule will be affncted by 8Q061B
revi*lani in schedule Fuel loading for Units 1 & 2 will be
delayed 1 ur Si Units 3 & 4 delayed 3 yrs
hKBKFFIE.rl A Carolina Pouter t, Light Co BO/07/11 13pp
B00717037B Chapter 3 to Shearcin Harris 1.2.3 t( 4 FSAR, "FiCB I Connected
3ya "
* Carolina PDUBT «i Light Co 80/06/36 !75pp
B00717O39-1 Chapter h to Bhoaron Harris 1,3,3 t. 4 FSAR, "Engineered
Safety Features "
» Carolina Power d Light Co BO/O6/26 fiSOpp
S00717O6OO Chapter 7 to Shearon Harris S . 3. 3 fc 4 F3AR,
"Instrumentation *t Controls "
* Carolina Pnuier ^ Light Co SO/G6/H6 SOOop
B007170615 Chapter H to Bhcaron Marl-is 1, S. 3 •. 4 FEAB, "Electric
Pousr "
» Carolina Power !< Light Co BO/O6/9* 133pp
C. Utility Environmental Report (ER), amends (. correspondence
B007170627 Chapter 9 to Sh«ai on Harris 1, a, 3 6 4 PEAK. " Aui 1 1 iary Sys "
» Carolina Pouier t- Light Co 80/O6/E6 700pp
BOO7170&32 Forwards FSAR.vols 1-2O, amended OL application t- tnvlron
rent for OL itaoa Environ rept onlv end
JONES, J A Carolina Power (. Liflht Co QO/06/26 3pp
B007170A43 Chapter IO to Shearon HarriE 1,3,3 !. fl FSAR, "Btcam & Pouer
Conversion age "
• Carolina Poucr !i Light Cr> BO/Od/26 150pp
-OO0717O6A3 Environ ropt for facility. Vol 1
» Cave-Una Paiaar E. Light Co BO/Oi/2A 3UOpp
8007170650 Chapter II to Bhearon Harris 1 , a, 3 !, 4 FSAR. "Raduaste Hgt "
» Carolina Power !( Light Co 80/Q&/3& 175pp
-B007l70i7B Environ rept for fac llitgi Vol S
* Carol inn Power & Light Co BO/06/26 BOOpp
— BQ0717Q60& Environ r«pt for Facility. vol 3
« Carolina Powor t. Liaht Co, BO/O6/2i 300pp
f S*curit(j1 aadical, nnargancy t* fir* protuction plans
BQ0717O&SS Chapter IS to Shearon Harris 1,2,3 f. 1
Protection "
» Carolina Power t- Light Co BO/Ofa/26 200pp
"Radiation
0007170661 Chapter 13 to Bhearon Harris 1,3.3 f. 4 FSAf), "ConOuct of
Op»rationa "
* Carolina Power 8. Light Cm BO/06/2S EBOpp
8007010332. Forwards industrial security safeguards contingency tt
sacurity personnel trainina *" qualification plans for
rovlou Plans withhold (raf 1OCFR2 790)
JONES, d A, Carolina Power t, Light Co BO/06/26 Hop
0 Adjudicatory correspondence
B00731O243 Forwards Commission B00327 memorandum & order containing
decisions on DCS 7BOH03 petition for reconsideration of
760413 (minor and urn & ord»r UCB 771104 petition sought action
ro fira protection for electrical cables
EI8ENHUT, 0 0 Division of Licensing BO/06/2S 8-?pp.
H Qeneral corraspondenca
B00702O19B HeBponds to B00916 Itr r» Kudiu Alliance concern* about
ability of util to aafaly utiliie nuclear pokier htf(C monitors
Bhearon Harris conut to assure conformance u/requirenents
Lavali of contamination from Brunswick no threat to public
DIRCKSiH J Office of the Eiecutive Director for Operatitins
eo/oi/iB app
--BO07O2O2I7 Raquests response to encl Kudiu Alliance BOOS1H Itr
commenting on ability of util to oofcly utiliie nuclear
power
J, I House of Rep 8O/03/16 2pp
H Utility Final Safety Analysis Report (FBAR) t. amends
80071703W. Forward* FSAR.Voln 1-20, amended DL application (• environ
repi for DL stage Only FSAR encl
JOMEBi J. A. Carolina Pouor & Light Co 80/06/3i 3pp
-B0071703A7 FBAR.Vols 1-20
• Carolina Pouer !< Light Co
BO/OA/26 7QOOpp
B007 170372 Chapter 1 to Bhearon Harris 1,2-3 d 4 FSAR, "Introduction
Oeneral Description of Plant "
» Carolina Pounr ti Light Co BO/Ot/26 SOOpp
B00717O&72 Charier 14 to SJiearon Harvio 1,3.3 t, 4 FSAfl. "Initial Teat
Program "
* Carolina Pouer (. Light Co QO/06/2A 75pp
B00717O677 Chapter 15 to SJiearoti, Harris 1,3,3 It 4 F9AF1, "Accident
Analysis "
» Carolina Power t. Light Cn 80/06/26 400pp
B0071706B4 Chapter 16 to a^caron Harris 1,2,3 t. A FSMi, "Tech Specs "
» Carolina Pouier t< Light Co B0/0fa/2t SOOpp
B00717O&B7 Chfl|ttor 17 bo Ehearon Harris 1,3.3 t< 4 FSAR, "QA "
* Carolina Pauiar (. Light Co 00/06/26 37pp
B00717O&90 App 1 to Shwnron Hums 1,2,3 !< 4 FSAR, lhTMl "
« Carolina PDUIBI- d Light Co BO/Ofi/36 37pp
Q Inspection reports, IE Bulletins !i
B007H40113 Forwards IE Info Notice HO-20, "l-ois of Decay Hsflt Hemnvnl
Capability at Davl s-Beaim Unit 1 While in Refueling hode "
No response required
O'REILLV, J P Region 2, Atlanta. Dffica n f the Director BQ/09/OB
B00721O12H Forwards IE Circular SO-13, "Oriil Strap Damage in
Heit InuhouBH Fue-1 Attomlilies " No uritten response i f! quired
O'REILLV.J P Roglnn 2, Atlanta, Office of Iho Director GO/OS/3B
IP
B0070I0179 Foruiar*5 IE Info Notice flO-23. "Loss of Suction to Emergency
FeeduuitBr Pumps " Mo luritten rosponse retiuired
Q'FIEILLY.J P Region 2. Atlanta, Office of the Director BO/O9/29
B0073H0043 FnruiarUs IE Info Notice BO-Bi. "Evaluation of Contractor
QA Programs " No uivitten response re-qu-irod
O'REILLY. -J P Region 2, Atlanta. Dfficu of the Director BO/06/10
Spp
B007170377 Chapter 3 to Bhearon Harris 1.3.3 d 4 FSARi "Site
Characteristics "
• Carolina Pouior !< Light Co 80/06/26 700pp
BO0717O511 Chapter 3 to Bhearon Morris 1,2,3 li fl FSAR, "Design of
Structures, Component*! Equipment b Bys "
H Carolina Pouier t. Light Co BO/06/26 700pp
BOO7170S72 Chapter 1 to Shearon Harris 1,2,3 (< 4 FSAR, "Reactor "
• Carolina Pouor fc Liaht Co BO/O6/2i COOpp
B0071A0223 Forwards IE Info Notice SO-27, "Degradatldn of Reactor
Coolant Pump 3tudc " No specific action or response
required '
O'REItLY.J P Region 3, Atlanta, Officp of the Director BO/O6/H !
IP |
B00725O339 forwards IE InPo Notice BO-2B, "Prompt Reporting of Info in
Accordance H/10CFF50 S5Ie) " No written response required
O'REILLY.J P Region 2, Atlanta, Office of the Director 80/06/13 '
50
3.07100377 Ac* receipt OF JE fnsp Hepts 50-400/BO-1G, 90-101 /80-1 1,
80-403/BO- 1 I ft 50-403/BO-M <,,, 000513-16 MO proprietarij
Info v
HOWE, P M Carolina Poiusr t, Light Co BO/Ot/lfa Ip
0Q07IO03O1 Foruartfa IE Insp Rap ta 50-4OO/BO-I3, 50-W/aO-l 1.
30-402/DO-ll t, 50-403/aO-lt on BOO&13-16 *, notice Of
violation
MUI1PIIV, C E PoB'on a. Atlanta. Reactor Con-B truct i On t Engineering
Support Branch BQ/Qb/OS 3pn
BOQ71CQ3O3 Notice uf violation from insp on 800513-14
• R»gion 3, Chicago, Office nf the Director SO/06/03 Ip
S REpoi-table otturrencesi uERs !t related correspondence
HOO70BOB19 Forwards final deficiency rept re omission of addl
reinforcing steal In Unit 1 containment bldg eiterlor uall
adjacent to const opening for equipment hatch
CHIANQI.N J Carolina Power t. Light Co, 80/06/30 Ip
— BQ07OHO257 Final deficiency rept re omission of addl reinforcing tteel
in- Unit 1 containment bldQ exterior wall adjacent to const
opening for equipment hatch Design revieu fc mod to «t«l
completed Craft work i< insp procedures revised
* Carolina Pouier 8. Light Co BO/Oi/24 3pp
B007I003I3 IE Insp Hunts 30-40O/00-13, -JO—JOI fBO~ 11* 50-4O2/BO-1 1 6
30-4Q3/BO-11 on 800513-14, N&ncDmn 1 lance noted tac* welds
deposited over heavy ruat
NenDt, ft ft [legion 9, Atlanta, Floactor Construction t. Engineering
Support Branch KLEWBOFIGE . U P Region S. Atlanta, Office of the
Ukreitar BQ/06/O3 -Jap
I070S0140 Forwards IE Circular BO-IS. "Lc-Ea of Heactrir Coolant Pump
Cooling & N.itural Circulation Cooldoun " No lurltten response
re q. Hired
P Region 2, Atlanta, Office o# thn Direttor SO/Oo/20
000716O377 Interim deficiencu reot re significant failure of r«ector
protection SUE follquing main feedline break Hestlnghouat
has indicated corrective action cannot be conplatBd before
DBC 19S1 Final rept will be issued upon complotion
CHIANOI.N J Carolina Power (, Light Co 60/07/08, Ip
8QO7230247 Part 21 rept re lack of stud bate qualification for angln
arc shield Evaluation will b« completud >>y B01001
CHIAHOI-N J Carolina Pouer t, Light Co 90/07/11 3pp
Operator Examinations
07100112 Acl receipt of BOQ&Os Itr informing NRC OF steps taken to
cnrract violation noted in IE Inap BeptB 50-flao/BO-ll.
50-401/BO-OB. 3^-403/9(1-08 !. SO-toa/BO-OB
HUUPHV.C E ncglori 2. Atlanta, Reactor Construction 5. Ertginewring
Support Dranch BQ/Qti/23 Ip
G0071BQ4S5 fjenuosts revieu & concurrence u/Btnlor Reactor OperAtor
Cartlf leatlon program & retraining program per HR Dentoti
BOO 328 Itr Certification program effective BOO i 30 Retraining
iffectlve In 19O) Description of both program* encl
COLLIH13.J M Carolina Pouer & Light CD BO/0&/23 9pp
B00710011O RosnimJs to NRC BOOSta J tr re violntion noted in IE Insp
n*ptn SO-400/CO-I1, 50-101/BO-Oe, 5O-402/9O-CB 5- 30-403/00-08
Corrective actions investigation held of collected te»t
data rv backfill rn^tl affecting Cotagory I piping
W Carolina Poiuor t> Light Co BO/06VO3 3pp
10071001SE Ack receipt of IE Insp Repta 5O-flOO-/BQ-l 1 , SO-flOl/SO-OB,
SO-flOa/BO-OB t, 90-IOD/BO-On on B00432-21 No proprietary
Info
HQWCiP U Cnrollna PnlUcr !. Lignt Co BO/O5/22 Ip.
aOD71OO4SEl Forulordi IE Inep Repts 30«4QtVB(>-l 1 , 3O-1OI /ao-OQ,
5Q-.402/HQ-(IEj t, 5[l~403/flO-OES on B004H3-34 t< notice of
violation
MURP,HY,C E Region 2, Atlanta, Rone tar Construct inn 8c Engineering
Elupport Brani-h BO/03/13 Spp
30D710043O Notice oF violation From inap on 000423-24
* Flfllion 2, Atlanta, Office of the Director BO/OH/IH Ip
i00710043fl IE Itiflp Hept-B 30-4OO/BO-H . 90-401 /BO- OS, SO-402/fiQ-OB ft
3-0-^03/80-0 EJ an 600433-24 Ndncomp I lane e noted failure to
con*idn-r effect of liackfill settlement analysis of Category
I piping
CONI.DN, T F RogJfllt B, Atlanta, Reattpr Cnnatruction (- Engineering
Support Branch U EN AH AN, J -J Reckon a, Atlanta, Office of the
Director (JO/03/ 12 /ijip
7160000 roriunrd5 IE Circular 00-14, "natfloac tiv< Contamination of
Innt DemlnnrnU led Hator Has & Resultant Internal
ontamina tion of Personnel " Ha written response roqglrad
'RElLLf-JP PoglDii 2, Atlanta, Office of the Director BO/06/34
P
forward i IE QjlJettn BO~it>, "potential Misapplication oF
Dsemount Inc riodols lit) t< USB Pie&sure TranBrnittors
/Either A or D Output Ca&ait " Vlritteri rBtponse Tenuiveil
E Circular HO-ld nl6o enc 1 No written response renutreif
P tlvgion a, Atlftntai DFftce of the Director BO/OA/37
7S20H10 ReftponilB to IE Bulletin BO-OB Revieu of containment liner-
unutMiLion wold dnaignn verified by applicable- drawings.
Nidi not complete aa plont is under const
A (.ornllna Poiuor It light Co BD/O7/O2 Bpp
Periodic oporn*i»a rcpiirts tt rclatoil eorreEpomSonce
DOCKET 30-4Q1 BHEARDN HARRIS NUCLEAR POWER PLANT. UNIT S
A Application/construction stage documsnts & correspondence
8QQ7Q3QHS7 Forwards cnmputer magnetic tape of omit* m»tearologlcal
data supporting FBAR Submitted in format described in
DB Vassatlo 790E3-1O Itr- Format description & tape dump of
first 69 records one] Tape available In Central Fila» onl«
HCDUFFIE.M A Carolina POIOOT tt Light Co 80/06/26 12pp
B00717062B Forwards F3AR, Vols 1-20, amended DL application fc environ
rept For OL stage OL application only end
JONES.J A Carolina power t. Liflht Co 80/06/E6 3pp
— 8007170637 Application for DL Annual financial rept It prospectus *ncl,
« Carolina Pouer t, Light Co BO/06/86 99pp
B00723000! Forward's statement of policy re reo,uirements to be met for
current OL applications,*! derived from NUHEQ-OofaO It found
EIBEHHUT, & 0 Division of Licensing BO/06/86 2pp
B007190935 Requests clarification of ANSI N45 S 10 as invoked bg Ritfl
Quid* 1 74iaa to uhother or not certificates of conformance,
certificates of compliance !* certified teat repts munt
contain longhand signature
MCDUFFIE.H A Carolina Power t, Lioht Co BO/07/09 Ip
0007220-456 Forwards nchedules of canst milestone* tt activities at of
BOO 630 Milestone netuiork schedule mill be affected by 6006 JB
revisions in schedule Fuel loading for Units 1 b 2 mill be
delayed 1 yr t< Units 3 t 4 delayed 3 ijrs
MCDUFFIE.M A Carolina PoLinr S. Light Co BO/07/11 13pp
C Utilitg Environmental Report (ER). amende b correspondence
3007170632 Forwards FSAR>Vol>j 1-2O, amended OL application S> environ
rapt For DL stage Environ rept only end
JONES, J A Carolina pouer << Light Co BO/O6/S6 3pp
— B00717OA63 Environ rept for facility, Vol 1
# Carolina Pouior fc Light Co 80/06/56 3sOpp
— B007l7Oi.70 Environ rept for faci 1 itu,, Vol 0
* Carolina Pouier t< Light Co BO/0&/S6 300pp
7SBOQO/ Foriuards "Ounrtarlij pat a Rnpt,3hearon Harris Nuclear Pouier
lant Monitoring Program, Api -June, l^BO"
CDUFFIG. M A Cnro-Jlne Pnwor ft Liflht Co 00/07/31 Ip
— B00717OftB6 Environ rept for faci 1 ity, Vol 3
« Carolina Power & Light Co BO/0&/36 300 pp
007BS05ia "OunrtBrlu Data Hept. SbOBTon Harris Muclcar Pouiur Plant
Monitoring Progrnm, ftpr-Jun-o J980 "
» Carolinff Power tt Light Co H0/07/3i Ip
f, Security, nodical, omergetity b fire protection plant
190O7O10333 Foruardi industrial security safeguard* contingency S.
occur Itg personnel training b qualification plant for
revUu Plan* uithn«ld (r.f 10CFR2 79O>
JONES. J A Carolina Power Be Light Co BO/Q6/2A 2pp
0 Ad judleatory cnrr>»pondBnci
SOOTS 10343 Forwards Compilation BOOIS? momorandum & ardor containing
<9Ciiion» on UCa 780 302 petition for reconsideration of
7BO413 nemarandun li ardor UCB 7711O4 petition sought action
re fin protection For alectrical cables
EIBEM4UT. D 0 Division of Licensing BO/06/29 B9pp
BOO7170661 Chaptei 13 to BheaFon Harn5 1,3,3 t< 4 FSAH, "Coniuct of
Operations "
* Carolina Pom-or f. Light Co HO/O6/2i
SOO7170672 Chapter 14 tn Snearan Harris 1.2,3 !, 4 TSAR, "Initial Test
Program "
* Carolina Pnuer b Light Co BQ/O&/3fc 75pp
QOD717O677 Chapter 1 "i to Shearon Harris 1,2,3 fe 4 FSAR, "Art ident
Ana lysis "
it Carolina Power « Ligrtt Co aO/Ofe/3£> 4QQpp
9007170604 Chapter 16 to Bhearnn Hams 1,2,3 & 4 FBAH, "Tech Space "
« Carolina POUICT b Light Co BO/OA/2A 500pp
H Oancnl corr««pon<t»nce
B00702D19B Respondl* to BOO516 Itr r* Kudiu Alliance concerns obout
ability of utll to safely utlliie nuclear power NJiC monitors
Bhnaron Karri* tonst to as&uro conformante ui/ren.uirnments
Loveli of contamination from Brunswick no threat to public
DIRCKEiiU J Office of the Eiecutive Director for Operations
SO/06/ IB Spp
8007170607 Chapter 17 to Bhearon Harris 1,3.3 5. rt FSAR, "Qfl "
» Carolina Power (, Light Co BD/Q6/2A 37pp
HDQ717069O App 1 to Sliearon Harris 1,3,3 !. 4 FSAR. "TMI "
* Carolina Pouier d Light Co 80/06/36 37pp
0 Inspection reports, IE Bulletins- & c
BOO703OZ17 Raquciti rstponim to enc 1 Kudlu Alliance BOOS12 Itr
toHnantlng on ability of utll ta laPolg utilize nuclear
pouar
AMDREMS, I House or Rep 00/05/16 Spp
0007240113 ForiaardE IE Info Notice BO-20, "Loss of Decay Heat Removal
Capability at Davis-BoSBH Unit 1 Whlln In Hofueling Mnde "
Ho rospotiae renulred
O'REILLY, JP Region 2. Atlanta, Office of the Director BO/OS/Ofl
K. Utility Final Safety Analysis Report (FBAIt) Si amend it
6OO7 170364 Forwards FSftR.Vola l~20i amended OL appliratlon t environ
rapt far OL »toga Only FBAR encl
JONES, J A Carolina Pouer t Light Cr SO/06/26 Spp
— B007170367 FOAR, Vola 1-30
* Carolina Pouisr t Light CD HO/06 /Si. 7800pp
6007170372 Chapter 1 to Bhoarnn Harris 1,2,3 t, 1 FSAFt. "Inti-odut tlon &
Oaneral Diticription of Plant "
« Carolina Pouer t Light Co QO/D&/a& 300pp
8OO7 170377 Chapter 2 to Shvaron Hsrrio 1,2,3 & -4 FfiAR, "Site
Chirac tor iitlcc "
» Carolina Pouar & Light Co BQ/Qt>/36 700 pp
8007170341 Chaptsr 3 to Sh-varnn Hnrrie 1,3.3 !. 4 FSAR, "Design of
Btruefture»i Components. Eq.olpmnnt Ii Sgn "
»_ Carolina Pouer & Light Co BO/Oo/26 700pp
8007J7097B Chapter 4 to Bhearon Harris 1(8,3 & 4 FBAR, "Reactor "
o Carolina Power (. Light Co QO/OA/ffo SOOpp
8007210493 Forwards IE Circular BO-13, "Orid Strap Daman D in
Hast ingh-nifse iFuul Assemblies " No urltton reapanse re<iulrutl,
O'REILLY.J P REflion B, Atlanta. Office of the Dlroctor RO/03/3S
IP
QOO7010179 ForuiardE IE Info Notice BO-2I3, "Losa nf Suction to Emergotv
Foeduater Pumji a " No uiritten rEspnisst inquired
O'REILLY. Jf HeBiBn H. Atlanta, Office of thit Directop BO/03/29
IP
6007220043 Forwards IE Info Notice 90-2*, "Evaljalion of Contractor
OA Programs " Wo uiritten response required
O'REILLY.J P Region 3. Atlanta, Offlen of the Director E10/06/10
B007160323 Forwards IE Info Notice BO-27, "Deorada 1 1 on of Reactor
Coolant Pump Etude," No specific action or response
TB-quir ed
Q'riEILLY.J P Reolnn 2, Atlanta. Office of the Director BO/Oft/ 1 1
IP
B007230339 Forwards IE Info Notice HO-3B. "Prompt Reporting at Info i
Ac-cordance W/10CFR50 35le) " Ho iiiriEtoj] responao required
O'REILLY.J P Region 2, Atlanta, Office of ths Director aO/Od/13
GOO717037B Chapter S to Shearon Harrln 1,2,3 t, 4 FSAR, "Rffl b Cannectad
Bgo •
* Carolina Pouar t. Light Co 30/Oii/St, 179pp
S007170374 Chapter i to Sheoron HarrU 1 . a, 3 t. 4 FSAR. "Enoineemd
Safutu F**tui BB "
« Carolina Pow»r t, Light Co BO/O6/36 650pp
S007170&OO Chapter 7 to Shearon Harris 1.3,3 t, 4 FSAR.
"Inatruoiftntation b Controls "
« Carolina Pouer b Light Co Q0/a6/3o SOOpp
BOO7170610 Chapter B to Shearon Harrla 1 , 3, 3 d 4 FSAR, "Electric
Pouer. "
* Carolina Pouer t, Light Co ao/Qb/Sh I25pp
0007170*27 Chapter 9 to Bnoaron Harris 1,3.3 & 4 FSAR, "Auxiliary H«* "
* Carolina Pouer !< Light Co 80/Oi/ai. 700pp
BO07170A43 Chapter ID to Shearon Harris 1,2,3 b 4 FSAR, "Steam Ic Pa<j»r
Conv»rminn Sy* "
» Carolina Pouer h Light Co 80/0&/2i
D0071704M Chaptor 11 to Shearon Harris l,a.3 t> 4 FSAR. "Raduaute Hflt "
* Carolina Pouer & Light CD 80/06/S& 173pp
HOO7100297 Ack receipt of IE Inup Hepto SO-100/80-J3, 30-401 /BO-1 1,
SO-402/BO-11 t, 50-103/30-11 on B00513-ii No propriBtary
Info
IWWEtP W Carol inn Pauier t. Light Co SO/06/I6 Ip
— B-OQ71QQ301 Foruiurils IE Insp Repts 50-40-n/BO-la. 50-401/fJO-ll,
90-402/aO-lJ !< 30-403/80-11 on 60Q»)3-i& !, notlcn of
violation
HUBWIVi C E Raoion a, Atlanta, flenitor Construe t i on i. Enginooi-iii
Support Uranch BO/06/Q^ 2pp
— BOQ710030S Notice of vlolatlnn from Insp an B00513-16
» Region 3. Chicago, Office of the Director BO/06/03 Ip
— BQQ7100313 IE Insp Rapts 50-400/BO-l'l, 50-3DJ/BO-1 i. 30—!Oa/BO-L 1 b
90-403/BO-ll on 00Q313-16 NonCfimp 1 ionc» rioted tack molds
deposited over heavy rust
HERDT.A R Region 3. Atlanta, Reactor Construe ti on d Engineering
Support Bi-onth K.LEIN80ROE, U P Reoion E, Atlanta. Offiie of th
Director SD/0&/03 9pp
i
BOO70204^0 Forwards JE Circular QO-13, "Lnaa of Rsactni Coolant Pump,
Cooling & Natural Circulation Cooldoum " Mo uirLtten rnsponae
roqulred
D'flEILLY, J P Region 3, Atlanta, Office of the Director
IP
fiOO717O693 Chapter 13 to Shearon Harris 1,9,3 b A FBAR, "Radiation
Protection. "
* Carolina Pouer b Light Co 90/06/56 SOOpp
8007100412 Ack receipt nf B0060S Itr informing NRC of stapt taken to
correct violation noted in IE Insp Repts 30-400/BO-llt
so-4oiyao-oa, so-ioa/BO-oB t 50-40.1 /BO-OQ
MURPHVjC E Region 2, Atlanta, Roactor Construe tlon t, Engineer Ing
Support Branch BO/0&/23 Ip
52
DOCKETED ITEMS
-80O710Q418 Responds to NBC B005I3 1 tr re violation noted in IE Itlsp
Ftcpta 20-400/80-11, 3Q-4Q1 /BO-OB. 50-4O2/QO-OB t. 30--103/BO-O8
Corrective actions i nve 9 t i ga t I &n held of collected test
data re backfill mat] affecting Category I piping
HDUE.P U Carolina Power !< Light Co SO/O6/O5 3pp
-8007100422 Act receipt of IE Imp ReptE 50-400/SO-l 1 , 50-401/BO-OBr
50~402/BO-Oa *- 50— IO3/BO-OB nil BO0422-24 No proprietary
info
U Carolina Power i Light CD BO/OS/32 lp
-000710Q42B Forwards IE [nsp Repts 30-400/30-1 ]. 3O-4O1 /SO-OQ,
50-402/BO-OB J. 5Q-4O3/HQ-OB on BOO422-24 ti notice of
violation
MURPHY. C E Region S, Atlanta, Reactor Construction & Engineering
Support Branch (30/O5/13 2pp
-BOO7I0043O Notice of violation from Insp on BOQ422-24
• Region S, Atlanta, Office Of the Director BO/05/12 lp
-3007100135 IE Imp Repts 50-100/60-1 1 , 30-401 /BO-OB. 30-402/80-08 &
SO-403/BO-OB OTI 8QO422-24 Wont omp 1 i-mce noted failure to
consider effect of backfill settlement analysis of Category
I pip ing
CONLDN.T E Region ?. Atlanta Reactor Construction & Engineering
Support Branch LENAHAN. -J J Region S, Atlanta. Office at the
Director SO/05/12 6pp
007160800 Forwards IE Circular 80-11, "Radioactive Contamination of
P-lant Demineraliiod Watei Bu 5 t, Resultant Internal
Contamination uf Personnel " Nu written response required
O'REILLY.J P Region H. Atlanta. Office of the Director BO/Oi/24
i „
JO7330H2O Forwards IE Bulletin 00-16, "Potential Misapplication of
Rasenmun.! Inc Models, 1151 t, 1192 Pressure Transnii tters
H/Either A OT D Output Codes " Written response required
IE Circular aO-ld also end No uiritten response required
O'REILLY, J P Region 2, Atlanta. Office of the Director BO/Ofi/27
lp
JQ722021Q Responds to IE I)til]etin BO-OB Review of containment liner
penetration ueld designs verified h ij applicable drawings
He Ids not complete as plant is under const
KCDLFFIE.M rt Carolina Power (. Light Co 60/07702 3pp
Periodic operating reports t< related c orrespundflnc
107230507 FopuiardB "Quarterly Data Refit, Shuaron Hdrris Nuclear Pouior
riant Monitoring Program, Apr-Junei t?aO"
MCDUFF1E.N A Carolina Pouer fc Light Co BO/O7/21 lp
00072BO513 "Quarter 1 ij Data ReptiShearan Harris Nuclear Pnuer Plant
Monitoring Program, Apr-June 19BO "
* Carolina Power !, Light Cn 8O/07/21 lp
Hepovtable occurrences, LER3 [< rcliited coi respppiiience
1071A0377 Interim deficiency rept re G i on 1 f lean t failure of mactor
protection ays following main foffdJine break Ucstinghnuse
has indicated cq-rractivp action rannot be completed defni-e
Dec WBI Final rept mill be >sEiieil upon tprnplstion
CHIANSI.N J Carolina Power a Light Co BO/O7/OB lp
107330247 Part 21 rept ro latfc of stud bate qualification For angle
arc shield Evaluation uilj be mmplete-d bg D0100I
CHIrtNOI.N J Carolina Power 6 Liffht Co fJO/07/ll 2pp
Operator Etaral nations
(0716Ofl2Q Ren.uPits review t, coiicurrnncc ui/Senioi- Reactor Operator
Certification program tt retrainiiig program per HS Denton
B00323 lir Certificntian program effective BOOA3O Retraining
effectlvo in 19B1 Description of both programs encl
COLLINS, J M Carolina Power t. Light Co 80/06/33 5pp
8007170629 Forwards FSAR.Vols 1-30, amended OL application t environ
rept for OL stage OL application only encl
JONES. J A Carolina Pouier fc Light Cn BQ/06/Sd 3pp
— HQQ717O639 Application fnr OL Annual financial rept & pro»p«ctu» *ncl.
» Carolina Pouior (- Light Co 8O/0&/2& 99pp
0007230001 Forwards statement of policy re requirements to btt net for
current OL app 1 ications, a& derived from NUREO-O660 & found
In NURC0-0&94
EIBENHUT,D 0 Division of Licensing BO/O6/26 2pp
B007130S3S Requests clarification of ANSI N4S 2 10 as invokad DM Reg
Ouide 1 74i as to whether or not certificates of conformnnc o.
certificates of compliance lr certified test repts mu»t
contain lonffhand signature
HCDUFFIE.M A Carolina Power fc Liflht Co BO/07/09 lp
8007220436 Foruards schedules of const milestone* li nctivltia* a> of
SOO630 Milestone network schedule mill be affected by QOOA1D
revisions in schedule Fuel loading for Units 1 b Z will be
delayed 1 yr & Units 3 & 4 delayed 3 Ljri
MCDUFFIE.M A Carolina Pouier !< Light Co BO/07/11 13pp
C Utility Environmental Report (ER), amends d corro »pand«nc:«
BOO717Q&33 Forwards FSAR.vols 1-20, amended DL application t, environ
rept for QL stagt Environ rept only encl
JONES. J A Carolina Power t. Light Co BO/06/36 3pp
— BOO7170&63 Tnviron rept for facility, Vol 1
* Carolina Power t. Light Co B0/0fe/2i 330pp
— 800717067B Environ rept for facility, Vol 2
* Carolina Pouer b Light Co HD/0&/2& 300pp
— BOO7170686 Environ rept for facility, Vol 3
* Carolina Pouei !i Light Co BO/06/36 300pp
F Security, medical, emergency b fire protection plans
6007010392 Forwards industrial security safeguards contingency t,
security personnel training & qualification plans for
review Plans withhold (ref 10CFR3 7<?0)
JONEB.J A Carolina Pouer & Light Co BO/06/26 3pp
0 Ad judicatory correspondence
B007310243 Forwards Ccmmlasion BOOS27 memorandum !i order containiny
deeliions en UCS 7SOSO2 petition for reconsideration of
7G0413 memorandum ft order UC5 771104 petition sought action
re fire protection for electrical cables
EISENHUT, D O Divicinn of Licencing 00/06/33 Bvpp
H General correspondence
900702:0190 Responds to 90O314 1 tr re KuJiu Alliance concerns about
ability of utll to safely utiliie nuclear pouer NRC monitors
Bhe-aron Harris const to assure conformance u/requirementt
Levels of contamination from Brunswick no throat to public,
DIRCKS, H J Office of the Eiecutive Director For Operations
8O/06/1B 3pp
--8007020217 FlequestE rosponGe to encl Kudiu Alliance BOOS12 Itr
commenting on ability of util to sifely utlllie nuclear
ANDREWS, I House of Rep BD/O5/16 5pp
K Utility Final Safety Analysis Report IFSAR) t amendn
00071 7 O36i Foruarda FBAR.VolB 1-20, amended OL application t< environ
rept for OL stage Only FBAJI encl
JONES, J A Carolina Pouer & Light CD BO/06/26 3pp
ICKET 50-403 SHEAflOM HARRIS HUCLET/tfl POWER PLANT, UNIT 3
App I i cat i on/construct 1 on etagi> d u c. ume n 1 5 & t arr espundenc e
07020437 Forwards computor inajiietic tape uf nnsifce me teorol og 1 tal
data B,uppDrblnn FSAFI Submitted in Format described in
DB Vassatlo 790810 Itr Formet flesc i-jpt ion d tape dump of
first &5 rBrortlr; encl Tape jvailahlc in Central Files only
M A Carolina Poiuoi !. t.lg'tit fa 80/O6/3& 12pp
— 80O71703A7 FBAH.VolS 1-20
a Carolina Power t. Light Cu ao/Oi/2fi 7BOOpp
6007t7O372 Chnpter 1 to Shearnn Hairis 1,2,3 fc 4 FSAR, "Introduction (r
CcnBral Description of Plant "
» Carolina Pouier d Light Co BO/O6/26 SOQpp
B00717O377 Chapter 3 to Shaaron Harris 1,2,3 E, 4 F9AR, "Site
Chnrac teriatir s "
* Carolina Power & Light Co BO/O6/2ii 700pp
263
(KW17094I Chapter 3 to Shearon Harris 1,2,3 t, 4 F9AR, "Design oP
StrueturBiiComponents. Equipment & Sys "
» Carolina Pouer & Light Co SO/O6/26 700pp
B00717O572 Chapter 4 to Shoaron Harris 1,3,3 it 1 FSAR. "Reactor "
• Carolina Pouer & Light Co SO/O6/26 200pp
BQO717O37B Chapter S to fihoaron Harris 1,2,3 Si 4 FSAR, "RCS i. Connected
B«i "
• Carolina Pouer (. Uioh.1 Co 80/06/26 175pp
BOO7170594 Chapter 6 to Shearon Harris 1,S,3 fc 4 FSAR, "Engineered
Safety Features "
• Carolina Power t> Light Co 80/06/26 630pp
8007160223 Forwards IE Info Notn.0 HO-27. " Dugrail at I <in Hf Rorit boi
Coolant Pump Stmls " No specific at t i nn ni ronpunnD
CrnEILLY.J I' H*aion 2, Atlanta. QFFH o «F th* rHiBituT fJO/Ofi/H
in
BQ07250339 Foiutard* IE Info flullro HO-SU, "Prompt nopnrtinQ iif lnFn 111
Accordanco W/ 1OCF.R*3O &3UO " No uri tl»n reupmmp r<M|uli*ii
D'REILLV.JP Region 2, Atlanta. Qffiro »f the IMiuctur BO/IWt/l.l
SOO7I00297 Ack receipt of1 IE Ini|i Rep La 5O 40O/00-1 J> '10-10 1 /(JO- 1 I ,
5Q-4O2/BO-11 t. 5O-4O3/aO-ll on QOO31J-I6 Mil l> ropi Ifl t nry
Info
HOWE.P W Carolina I'uuier I, Light Cn HO/Ofi/lfc In
aOO71706OO Chapter 7 to Shearon Harris 1,5,3 t 4 FBAR,
"Instrumentation & Control* "
• Carolina Pouer fc Light Co BO/ 06/26 SOQpp
B007170613 Chapter G to BhBaron Harris 1,3, 3 & 4 FSAtt, "Electric
Pow«r "
• Carolina Punier & Light Co 80/06/26 123pp
0007170627 Chapter 7 to Shearon Harris 1,3,3 t, A FSAR, "Auiillarij Qys "
a Carolina Power b Light Co BO/06/26 700pp
0007170M3 Chapter 1O to ahearon Harris 1. 2, 3 & 4 FSAR. "Steam b Powor
Convenion Sij* "
• Carolina Power h Light Co BO/06/26 ISOpp
-90O71OO301 Forward's IT Insp Hcpta 5O-' lOO/HU- 1.1, 5t>- 1<l I /HO -1 1.
ao-ioa/ao-n t. QO-IOS/EJO-II on uoosn-iA f< nDtim or
violation
HUFIPHV.C t neglon 3, Atlanta. Heine tor < ciiin true, t i on ti ling i iHhurlnij
Support Dranch QO/O/J/D1 Epp
-00Q710030S Notice uf violation from mop fin BOO 51 ill- I A
* RegtDn -3, Ch(c.,J!)fl. Hfflce of the Direct"!' tlO/Ofi/OH Ip
-B007100313 IE Insp Ropts 50-40C»/BO- 1 I. 90 -401/110-11. DO-1CW60 II fc
50-403/00-11 on flOOTiia-J6 Noncomp 1 1 nnc* noliiif toi li wolilB
dopusited avor hoavy rust
HEHDT. A R Ucglon 2, Atldnta. Re.K tor Cnnntrut tion *. FnoinDoilna
Support Branch KLE INE1DRIJE. W P ftugHin ',!. Atlnnto. tHPlcu n P Ihv
Director QO/Ofa/05 'Ip p
8O0717065O Chapter 11 to Bhraron Harris 1,2,3 ic 4 FSARi "Raduastn Hgt "
* Carolina Power lc Light Co BO/06/26 175pp
8007170695 Chapter 12 to Bhaaron Harris 1,2,3 I> 4 TSAR. "Radtatlan
Protection "
* Carolina Powrr b Light CD BO/O6/26 200pp
BO07170AA1 Chapter 13 to Shearon Harrii 1. 2, 3 lc 1 FSAR. "Conduct of
Operation* "
» Carolina Pouer ft Light Co HO/06/26 39Dpp
BQQ703Q14Q Forwaril* IE Circular 110-15, "Uooo at H&nctnr (oolont Mump
Cooling (-Natural Cinulat inn Cuolilouu " No gjrltton ruoponmt
required
P'REILLY.J P flcgion a, Atlanta, flffu t> of Iho Dli&ctnr IJO/Ofi/S'O
lp
G007100112 Ack receipt of flOOfiOS Itr inPormirn NUT of atepii Lnkmv In
correct violation nutud In IE Inop HoptE 30-fl<)ft/(IO- I 1 ,
SO-'Ol/BO-OBi S(]-flO2/HO-OQ & 3C1-4O3/I!O-()H
MUfiPHY. C E ftffjinn 2. Atlniitiii Fictictur Ciinvtrut t ion ?< rnifLneurl ng
Support Branch fl(»/OA/p;) lp
3007170672 Chapter 14 to Shaaron Harris 1,2,3 fc 4 FSAR. "Initial Teat
Program "
* Carolina Pouar b Light Co BO/06/26 79pp.
8007170677 Chapter 13 to Hhearon Harris 1,2, 3 t, 1 FSAR. "Accident
Analyst*. "
* Carolina Pounr & Light Co BO/Q6/2& 4OOpp
B007170684 Chapter 16 to 9h»aron Harris 1,2.3 b 4 FSAR, "Tech Spec* "
» Carolina Pouer ft Light Co 80/06/26 BOOpp
—8007100410 RoBpomlu tu NflC UOfl I '3 1 Ir rfj violation luitod In H Ino
R>ptn 90-40D/HO-1 1. 11O-101 /HCI-OH, ^()-40H/l(ll-Ofl « 10- "IHJ/liO- OH
Carroctive aclionn inv«*L lijfit inn held of en 1 I o-r li'il teat
data re backfill mfltl nffcttins Ci.tuporij 1 pl[vln<|
HOHE.P H Carnlina I'guur S. Light Co ftO/OA/OT 'lji|i
~-BOO7lOOfla2 Aqk rcrcipt iif 1C lnB|i tt«p tu HO-flOO/tld 1 1 . 'ICi-HOl/SlO Oil.
50-1OS/HO-OB (, 5O-103/HO-00 on HOOtPt'-J1* Hu pioprlutorg
info
IIQWE.P U Carolina PHUDT t, Light Cn HO/OU/Hf! Ip
B007170687 Chapter 17 to Bhvaron Harris 1, B, 3 & 4 FSAR. "QA
» Carolina Pouiar d Light Co 80/06/26 37pp
BO0717O690 App 1 to Shearon Harris 1- 2. 3 & 4 FSAR, "Tril "
* Carolina Pou«r & Light Co BO/06/26 37pp
Inspection reports. IE Bulletins d corr espondenc B
— 800710O42B rnr-uJiil-d s IF. Inup Rrptn tiO-IOO/fllt- \ I , 'HI- -HH/tK) (It).
50-402/60-0 B to -lO-lori/aO-OH on f}QQWH-2<\ t, ntitiin of
vi alation
KiJflPHY'C C Dug ton 3, At I on t a, tNMcCor {.tinn t ri»e 1 1 on t. I ng I "oar lug
Support Branch RO/OS/13 i'pp
— 80O71O0430 Notice of violation from limp nil F)[)()*;^' ;"l
" Hnflton a, Atlanta, Offico of tlir- Dircil-nT fll)/flt/lJJ Ip
8O07S40113 Foruards IE Info Notice SO-HOi "Loss op Decay Hoat Removal
Capability at Davis-Be*** Unit t Hhila in Refueling Mode "
No response required
O'REILLY. J P Raglan 2. Atlanta. Office of the Director GO/O9/OB
2pp.
BO0721O422 Taruards IE Circular 80-13, "Grid Strap Damage In
Heatinghtiuse Fuel AiseMfalles " No written reiponsn rrituired
Q'ftEILLY.J P R«glon 2, Atlanta, Office of the Director 00/05/38
0007010179 Forwards IE Info Notlea 00-83, "Loss of Suction to Emorgoncu
Fetdwatar Pumps " No written response roquirid,
O'ReiLLY, J P Region 2. Atlanta, Office of the Director 80/O3/27
6007220043 Forwards IE Info Notita 60-36, "Evaluation of Contractor
QA froorame " No written response required
O'REILLY, J. P. Region 2i Atlanta. Office of the Director BO/06/1O
2pp.
— BOO71O043S IE Insp Kept! SO-4OO/B{)-lli 00 40t/H(> OH. '10- OO.'/EiO OU l<
30-403/fiO-Oa on HOOiaj-24 Noiicfimalianrtt untixl folluro tu
conBidur pffuct uf liaclifll) ni'tllcmont nunlijntn <if ( iilDcjouj
I piping
CONLDNi T C [IdDlnn 2i Allantni rioiirtor ( onn t,i uc 1 1 un !< Esng I nimr Jug
Support Brflnrh LrNAMflNi J J Huuion J1. Atlnntii, Offhe of Hid
Director (JO/Oft/lt1 ftp p
C00716OOOO Toruaril* IE Ctnular HO-14 "iJuil I uni 1 1 vc Cnultim nul 1 un of
Plant Dominoral i :ort Watar •'iije t< F4»%ul tunt Intoi tml
ContamlnatiiiTi of PpiEonnul " N« milttpn renp<mis.D i<i>(|uU*<t
O'RETLLV.JP Rao inn 3. Atlanl.i. tlffitt yT the Dliuclm RO/fJ'i/.J4
IP
B007230220 Torwards IE Oullntin f]0-lfl. "I'u 1 1 ut in I ih uappl 1 1 atltin nf
Rosemount Inc Moiluls 11D1 t: ligp h'ri'inujve Ti nyiomil t UT v,
H/E!thor A or D Output toili". " Ui ttenn ^l^^|^ol1n^l r«iulr«il
IE Circular BO-ltt ultu unt 1 Nvi uritU-n rot-punno- rmiiilrm!
O'REILLY, J P Huginn !Ji Atlnntn, CITPirr or tlir, Uiriict'tir
B0073aQB10 fienponila to 1C D«) H'l Hi 00-011 Fteviow o( i onto liimont 1 Initr
penetration ueld ditslfjno verified b ij ,^|ip Hi nlil » drnwtnijfl
Molds not complotu at, plant ii, under cimul.
MCDlfFFlC.H A Carolina Pouar !' light (,o OO/O/ '():• E!pp
DOCKETED ITEMS
oriciriic up sr-at ing reports !• related
spond pnr
F Security, medical, emergency fc file- protection plans
38O307 Fcirurariln "(luciir tor 1 ij Data Ht-pt, Shearon Harris Nut 1 ear Pouer
ant Monitoring Program, rtfiv-Junc, 1 100"
DUFFie.M A Carol Ina PQLIIT b Light Til BO/Q7/21 I p
3 "(Hi^rterlg Data Kept. Slte,iror> Ha ins Nucloar Pnuor Plant
Moni taring Progrnmi Apr- June 1<?BO "
» Carolina I'ouer f. Light Co tSO/O7/21 Ip
LEfl o (< rolatod
eBp ondcnc
Interim deficiency rpnl re significant failure of reactor
•n tut t ion a iji, fnlloujitifl mam f ecd 1 irie bruak Uostins house
.a indicated tnrroctivc action tannnt lie mmp 1 e ted beffore
• c 19HJ Final repf un 1 1 lie i&sued upon completion
HANOI. W d rnrulina Pouer !. Light Cn BO/Q7/QB Ip
'2:3Q347 Part 31 rept re lfii.li of atud bjse inia 1 i Fit a tion for angle
c sill eli) Evaluation mill ti e rompleleit by SOlOOl
HANOI. N J Carolina I'oujer ?. Light Cu BO/07/11 2pp
)p era tor
KC1 Roqiir-Kts revicu !i c QI>C urreuco ui/S-pnlnr fteactor (Jjiorabor
icfttinn pro-gram *. retiaining program per HR Dnntan
Itr fcrtif icaticin program effective H0043O Retraiti ing
Pfective. in 1VDI D-oscr I ption of both pi ogi ama end
JLL1N8. J H farolitia Poiucr (. Light Co flO/OdyaT 9pp
,ET 50-flOJ BHEAfiDM HrtRRIS NUCLErtK POUCR PLANT. UNI7 4
ip pi ltd tlt)ii/c nils truction Etajo doc iiracn 1 15 to correspondence
F(irwai-i1t coniputer moonotic tape of onslte me teorolDg ical
ta suppiirt ing f-SAII GuhmiUcif in format described in
< V.issatln 77OEJIO Itr Format desinption ^ tope dump of
rot 63 recordc sncl Tape nvailnblo in Central Files only
•IHJFF1F.M A CnrolitiJl Power b Lig-ht To aO/OA/2i) ISpp
Fnruarda fii(Ml.ValG 1-UOt itmend cd OL application lc onviron
pt Pur HL ntage flL flpp 1 icnti on only pncl
Ni£R,J A Carihllna Power (, Light Co BO/Ofe/BA 3pp
:)9 ftpp 1 icfl t IIITI fur OL Annual finanrial Topt ii prospectus end
» Carolina I'nuicT !, Liglit fo ao/Oi/^6 ^'?p p
2-UOOO] F-oruari!s Etatemelit of pulley re rcq.ulrnnient5 to he met for
rrent [)L app ! ic a t lone, as derived Prom NURES-OAM) t< found
bENHUT, D CJ Division oF Lieonning UO/06/36 2p p
lilORJ'fl Hofiunstf. t lerlf lest ion nf ANSI Nir) 3 )O fl5 invoked bij Rag
ildo J ?-li so tn whether or nut cortlficatos o-P t onf ormancB,
irtiCl-tati-B a? inmplidiicc ti fLTfclPiDd teat repta must
in tain Innghnnd signature
A CnrultnJI POIUBT t. Light Go HO/O7/O9 Ip
forward* acliodulei oP cunit milestones d netlvltioo at. at
HO MltDtttune iietuiirt srliortult uiLll he jpPoctod b<j BOD61O
JVt»lii»r, in Brheduli- Fuol Itiuding fnr Unitu I & 3 mill b a
ilAUOd I yv tt Uiut» 3 '< 4 dolnvt'11 3 y r s
'IHJFriF.M rt CnrolinB Power [1 Lijlit To HO/07/11 13pp
Jttlitij Gnvi rnnraoiitfll Rirpurt fER), amnnilc '< c qrresponileiico
iflR.Vols l-i30, nmonilBd OL application a environ
viron rtpt only encl
er ft Light Co QO/Ob/Sit 3pp
r facilitj.Vol I
HOO701035S Forwards industrial security safeguards contingency
security personnel training b qua 1 i picntlon plans for
review Plans withheld (reF 1QCFR3 7901
JONES, J A Carolina Pouer b Light Co BO/06/26 2pp
0 Ad judicatory correspondent: i
B00731O243 Foruiards ComraiBsion BOO327 memorandum fc order contalnins
iociuions on UCS 780302 petition for reconsideration of
7SO413 memorandum & order UCB 771104- petition sought action
re fire protection For Electrical cables
EISENHUT, D 0 Division of Licensing BO/06/23 S9pp
correspondent!
BO07O20193 Responds to BOOSlfi Itr re Kudiu Alliance concerns about
ability of utl 1 to safely utiliie nuclear power NRC monitors
Shearon Harris const to assuro conf ormance Lu/re(lLiiriim»ntB
Levels of contamination from Brunswick no threat to public
DIRCKS,U J Office of the Executive Director For Operation*
SO/06/ IS Spp
— B007030217 Requests response to end Kudiu Alliance 600312 Itr
Commenting an ability of uti 1 to safely utilite nuclear
nouior
ANDREWS. I House of Rep HO/OS/ 16 2pp
K Utility Final Safety Analysis Report (FSAR) fc amencla
EOO717036b Forwards FSARiVols 1-2O, amended OL application t, environ
rept Fnr dL Btago Only FSAR encl
JONES. J A Carolina Power & Light Co BO/Oi/26 3pp
— BQQ7170367 FSAR. Vols 1-20
« Carolina Pouer & Light Co GO/0&/2& 7QOOpp
BOO71703/2 Chaptsr 1 to Sheoron Harris 1.2,3 t. 4 F8AR, " Intordurtion &
Goners 1 Dffttcr i (i t i on of Plant "
* Carolina Pauier !. Light Co QO/06/26 SOOpp
GOO7170377 Chapter 2 to Shearon Harris 1,3,3 tt 4 FSAR, "Site
Character! sties "
» Carolina I'ouer !. Light Co 13()/O6/2t 7DDpp
8007170341 Chapter 3 to Bhearon Harris 1.2,3 & 4 FSAR, "Dooign of
Structures, Component's, equipment & "3ij s "
» Carolina Power d Light Co BO/Oi/26 700pp
HOO7170372 Chapter 4 to Bhearon Harris 1,2,3 f. 4 F9AR, "Reactor "
* Carolina PQiusr d Light Co no/06/36 SOOpp
6007 170578 Chapter 5 to Shear-on Harris 1,2,3 t, 1 FBAFi, "UCB k Connectad
Sya "
M- Carolina Pouer & Light Co (JO/06/26 175pp
BOO7170394 Chapter 6 to ShBaron Harris 1,3,3 S. 4 FSAH, "Engineered
Safety Feature's "
* Carolina Pouiffr t. Light Co BO/O6/36 680pp
B007170600 Chapter 7 tn Bhearon Harris 1,2,3 fc 4 FSAR,
" Instruments ticn *< Controls "
* Carolina Pouor li Light Co BO/06/26 SOOpp
BOO7170613 Chapter Q to Shoaron Harris 1.2,3 t- 4 FSAR. "Electric
Power "
«• Carolina Pouer Si Light Co BO/O6/36 ISSpp
BOO7170ei27 Chapter 9 to Bheoron Harris 1,2,3 t, 4 FSAH, "Auiiliary Sus "
* Cfli-ollno Pouor {. Light Co BO/O6/36 70Dpp
B007170643 Chapter 10 to Shearnn Harris 1,S, 3 I< 4 FSAR. "Steam b Power
•Conversion Sys "
«• Carolina Pouer b Light Co BO/06/ 36 150pp
eOO7170ib50 Chapter 11 to Shearon Hams 1,2,3 & 4 FSAR. "Radumste Hgt "
» Carolina Power & Lioht CD SO/OA/36 173pp
BOO7170655 Chapter 12 to Bhearon Harris 1.3,3 b 4 FSAR, "Radiation
ProtBc tion "
•* Carolina Power !j Light Co BO/06/56 200pp
DOCKETED ITEMS
8007170661 Chaptir 13 to Shearon Harrl* 1*3,3 fe 4 FSAR, "Conduct of
Operations "
» Carolina Pouiar b Light Co BO/Ot/36 HSQpp
BO0717067S Chapter 14 to Bhvaron Harris 1,2,3 t, 4 FSAR, "Initial Test
Progran "
« Carolina Power b Light Co BO/O6/2A 73pp
BOQ717O477 Chapter 19 to Bhearon Harris 1,3,3 t< 4 FEAR, "Accident
Analunii "
• Cai jlina Power & Light CD BQ/Q6/3&
8007170681 Chepter 16 to Bhearon Harris 1,2,3 b 4 FSAR. "Tech Specs "
* Carolina Pouer tt Light Co BOVO6/2& SODpp
'8007170667 Chapter 17 to Bhearon Harris 1,5,3 & 4 FEAR, "GA "
* Carolina Power & Light Co BO/OA/2t 37pp
B007170&90 App 1 to Bh«arun Harris 1.3,3 It 4 FBAF1, "TM1 "
* Carolina Power t> Light Co BO/06/H6 37pp
Q Inspection reportai IE Bulletins Si correspondence
B00724D113 Forwards IE Info Notice 80-^O, "Loan ttf Dte*g Heat Removal
Capability at Davls-Bense Unit 1 While in Refueling Modi "
No r»«pon»i requlrm!
D'REILLYiJP Beaton 2, Atlanta, Office of the Director BQ/03/Qfl
8pp
6007210422 Forward! IE Circular BO-I3, "Drill Strap Damage in
M»Btlnghou*e Furl Aliaatbllei " No written respo-nse required
0'RElLL.ViJP H«olon 3. Atlanta, Office of the Director BO/05/ 30
IP.
0007010179 Forward* IE Info Notice 80-33, "Loss of Suction to Emergency
Faadwater Ponp* " No writton response required
O'REILLY, WtP Rofllon S. Atlanta, Office of the Director QO/OS^29
If.
B007320Q43 Forward* IE Info No ties 00-26. "Evaluation of Contractor
ttA Prograxf " No urittan response required
O'REILLY, J P. Region 3. Atlanta, Office of the- Director BO/Oi/10-
2pp.
BO0716O223 Forward* IE Info Notice BO-27, "Degraitatlon of Reactor
Coolant; Pump Studs," No ipeclfic action or re •spouse
rftqiiirad.
Q'fiEILLY, J P Region S, Atlanta, Office of thlr Director BO/Oi/11
— BOO71OO11B Responds Kn KKC BOO513 Iti it \iolations noted In IE
Repts 5O-400/BO-J 1. SO-4O1/BO-OB, 50-fl02/eO-OB b 50- 403/ BO-OB
Corroctive actions investigation held of collected test
data re backfill mat! affscting Category I piping
HQWE,P u Carolina PDIUCI !, light Co BO/06/ O5 3pp
— BOO7I004as Ack receipt oF IE Insji Repts BO-4OO/BO-1 1 , 5Q-401/BO-OE
3O-1O2/BO-OD v 50-4O3/aO-Oe an 3001^2-3^ Na proprlotarg
info
HQWE.P U Coroll-na Pniuer t< Light CD BO/OS/a2 lp
— BOO71O042B FpriuardE IE Inap Rept3 5O-flOO/8t>-l 1 . 5O-4O1 /HO-Oa,
50-103/BO-OB t< 5O-4O3/aO-OB on 300422-24 fc notice oF
via 1 ation
MURPHVi C E Region S: Atlanta, Reactor Construction !• Engineer
Support Branch 8O/OS/13 2p p
— BO071O0430 Notica n f violatjon from insp on at)Q4S3-34
* Region B. Atlanta. Office of the Director QO/O5/1& lp
— 900711)0435 IE Tnap Repta SO-4OOyBO-l 1, 50-401/30-09. 30-flO?/BO-08 !
50--503/BO-06 on BQ0423-34 Montompl iance noted failure to
consider effect uf backfill settlement aiialyais nf Categorij
I piptns
CDNLOMi T E naglnn 2. Atlanta, Reactor Construction Si Engineer
Support Branch BO/05/13 6pp
3O071&O80D Forwards IE Circular SD-14, "Flad i oac tl ve Contamination <
Plant DemlneraJ i zeil Wdter QIJS Si Resultant Internal
Contamination at PerBonnel " NQ written reaponse required
O'KEILLY.J P Region 3. Atlanta, Office of the Director BO/Oft,
IP
BOO7230H20 Forwards IE Oulletin BO-16. "Potential MJsappl 1 cation P
ROBemount Inc ModelB 1151 It 1152 Pressure Transmitters
M/Either A or D Output Codes " Written response required
IE Circular BO-16 also end No uirittcn response required
O'REILLY, J P Region 2, Atlanta, Office of the Director
H007H20H10 Desponds tn IE BuliE-tin 80-00 Rcviaw of tontalnmenl 1 in
penetration uicld designs verified bij applicable drawings
Melda not contpletc as plant is under const
MCDUFFIE.H A Carolina Pomer It Light Co BO/O7/O2 2pp
It Periodic operating reports E< related correspondence
BOO7280S07 Foruiards "Quartarly Data Rcpt, Shearon Harris Nuclear Pot
Plant Monitoring Program, Apr-June, l^BO "
MCDUFFIE.M A Carolina Power t< Light Co BO/07/SI lp
BOOTS SO 339 Foruai-ds IE Info Notice BO~2Hj "Prompt Reporting of Info In
Accordance H/10CFR30 3S(e> " No written response required
Q'flEILLY, J P Region B, Atlanta. Office of the Director BO/OAV13
2.p
D007100297 Ack receipt of IE Imp Repts 50-400/60-13,30-101/00-11-
8O-W2/BO-1 1 li 30-403/BO-ll on 800513-16 No proprietfli-g
Infn.
HOME, P M, CarollTia Power » Light Co BO/06/li. kp
--8007100301 ForuarflB IE Imp Rapts 90-1OOySO-13, SO-101/80-1 1,
50-^02/aO-ll h 30-403^30-11 on B00513-16 & notice of
violation
HURPHYiC E Region 3, Atlanta, Reactor Construction tc Engineering
Support Branch QO/06/05 Kpp
— 80Q7HB05I3 "Quarter-Ill Data Kept, Shearon Harris Nittlear Pouier Plar
ManitorinB Program, Apr-June IfBO "
* Carolina Poiuei «< Light Co BO/07/31 lp
B RppdrtablE ccturrpnccs, LERt S< related lorretpendence
H007160377 Interim d«f ic i ertcy rppt re significant Failure of raactd
protection ays fallowing mdiri fcprfllne break Wsst irgfiouse
has- indicated cnrT«ctive action cannot be completed before
Dec 1*?B1 Final rept uiill be i asuoil upon completion
CMIANOl.N J Carolina Pauur !. LiH>>t Co 80/07/08 lp
B 007 2302 47 Part 21 rept re lack nf btud base qualification for angl
arc shield Evaluation mill lie- ctntip let nd tiij BO 1001
CHIANOI.N J Carolina Power t. Light Co BO/07/U Hpp
— B007 100305 Notice of violation from Inap on BO0513-lt
« Region 3, Chlcagor Off i en of the Director BO/OJ./0& lp
—8007100313 IE Imp Rapt« SO-4OO/8O-13. &Q-10t/SQ-i 1 , SO-10S/80-1 1 t,
90-403/80-11 on 800B13-1A Noncompl innce noted ta.ck wslds
depotltad aver heavy ruit
HERDTiA R- Region 3, Atlantai Reactor Construction d Enainturing
Support Branch. 60/06/03 9pp.
V Operator Examinations
BO071B04HB Rffquests TBVI-BUI & concurrence y/Henio.r Reactor Operator
Certification program tt retraining program per HR Denton
BOODSfl Itr CertificaSifln program effective BOOi3O Retraining
effective In 1931 Description tif both iirogradis em 1
COLLINS, J M Carolina Power ft light Co BO/O6/a:i 5pp
8007020440 Forward* IE Circular BO-IB, "Lois of Reactor Coolant Pump
Cooling h Natural Circulation Coal-down, " No uritton response
required
Q'BEILLV,J P Region 3i Atlanta, Office of the Director BO/O6/20
B007I0041S Ack receipt of BOOiOS Itr informing NRC of steps taken to
correct violation noted In IE Inop Repts 50-40O/PHO-11,
90-401/BO-DB, 50-402/80-00 t, BO-403/60-OB
MURPHYiO.E Region 2, Atlantaj Reactor Construction t> Engine«Finj
Support Branch 90/06/83 lp
DOCKET 30-104 NORTH ANNA POHEK STATION, UNIT 3
A Appl 1 cat ion/c [instruction -itarje documents fi correspontlancf
BO07230001 Foruiards stdt-ement of pnliiv rs rsqu irernentB to be i
current DL app 1 1 cat ions, as derived frnm NUHEO-0&60 t> found
in NUREO-Od71
EIHENHUT.D Q Dlvisian of Licensing BO/06/36 2pp
256
DOCKETED ITEMS
B007O1O363 Responds to NRC 800121 request for info on Category. I
masonry malls Design criteria will be developed utilmng
acceptable metfiodnl ODIJ No masonry walls Installed at
present
BRDHN.S C Virginia Electric t. Power Co HO/Oi/27 lp
H General correspondence
8007150047 Responds to B00327 1 tr to President Carter re granting VEPCO
authority tn build another nuclear plant Discusses util
plants, operating A under const & relative casts c-F coal vs
nuclear energy
YDl/NQBLQOD. B J Operating Reactors Branch ! BO/O5./13 &pp
ti indemnity information
BQQTlSOflvO Forwards Endorsements 23 & 3t to NELIA Polity NF-24O
PIERCE. D A Marsh t< McLennan, lilt , M ft M Nuclear Consul tanta. Inc
Div BO/07/10 3pp
(3 Inspection reports, IE Bulletins ti correspondenc i
H Oeneral torresp ondonce
BQ0715O047 Responds to BOO327 1 tr to President Carter re granting VEPCO
authority to build another nuclear plant Discusses util
plants, operating & under const b relative carts of coal V*
nuclear energy
VOVJNGBLOCJD, 1J J Operating Reactors Branch 1 BO/03/13 Dpp
J Insurance !i indemnity information
BOO715047O Forwards Endorsements SB d 29 to NELIA Policy NF-340
PIERCE, D A Harsh fc McLennan, Inc , M t, M Nuclear Consultant!, Inc.
Div BO/07/10 3pp
a Inspection reports., IE Bulletins b correspondence
BOO724O330 Forward s IE Info Notice BO-20. "Loss of Decay Heat Renoval
Capability at Davis-Hesse Unit 1 While in Refueling Mode "
No response required
O'REILLY, J P Region 3, Atlanta, Office of the Director BO/ 03/00
2pp
0007340930 Forwards IE Info Nutice BO-20, "Lois of Decay Heat Removal
Capability at Davn-Besse Unit 1 While in Refueling Mode "
No response required
O'flEILLY.J P Region 9. Atlanta. Office of the Dire* tor BO/05/-OB
app
8007210477 Forwards IE Circular 80-13p "Qrld Strap Damage in
UestinghnuSE Fuel Assemblies " Nn written response required
D'REILLY.J P Region 3. Atlanta. Office of the Director BO/05/2B
lp
BOQ701023V Forwards IE Info Notice BO-33, "Loss of Suction to Emergency
Feeduater Pumps " No written response required
D'REILLY.J P Region 2, Atlanta, Office af the I) i ret tor 30/05/29
IP
9 007 230066 Foiwards IE Info Notice 80-26, "Evaluation of Contractor
QA Programs " No written response required
O'DEILLY.J P Region 3. Atlanta, Office of the Director BQ/Oi/lO
BOO721O477 Forwards IE Circular 80-13, "Grid Strap Damage in
UestingliouBB Fuel Assemblies " No written response required
D'REILLY.J P Region 2, Atlanta, Office Qf the Director 8O/05/2B
BOO7O1O239 Forwards IE Info Notice BO-23, "Lo«3 of Suction to Energeneu.
FeeduatBr Pumps " No uirittcn response required
Q'REILLV, J P Region 3, Atlanta, Office of tha Director, BO/OS/2?
BOO7SaOOii Formards IE Info Notice 30-26, "Evaluation of Contractor
OA Programs " No written response required
O'REILLY.J P Region 2, Atlanta. Office of the Director 80/06/10.
2pp
BOO7160307 Forwards IE Info Notice 80-27, 'TJegrattati on of Reactor
Coolant Pump Studs " No specific action or response
required
D'REILLY.J P Regmn 3, Atlanta, Office of the Director 80/06/11
IP
8007160307 Forward) IF Info Notice BO-27, "Degradation Of Reactor
Coolant Pump Studs " No specific action ar response
re-quired
O'REILLY. J P Region 2, Atlanta, Office af the Director SD/O&/11
BQ0723O3BI Forwards IE Info Notice EO-2B, "Prompt Rrportlng of Info in
Accordance W/10CFH&0 S5!e) " No written response rRquirttd
O'REILLY. J P Region E. Atlanta. Offico of the Director BO/06/ 13
30Q7SbO3Bt Forwards IE Info Notice SO-2B, "Prompt Reporting of Info In
Accordance W/IOCFRSO 3S(e) " No written response required
O'REILLV.J P Region 3. Atlanta, Office of the Director BO/Ofr/t3
2pp
aOO70a0434 Forwards IE Circular BO-15. "Loss of Rnactor Coolant Pu*p
Cooling fr Natural Circulation Cooldoun " No written response
required
O'REILLY, J P Region 2, Atlanta. Office of the Director BO/06/20
B 007020434 Forwards IE Circular BO-IS. "Loss of Reactor Coolant Pump
Cooling '< Natural Circulation Coolrioun " No written response
requii-etl
O'fiGILL'r.J P Region 3. Atlanta, Office of the Director BO/06/HO.
Ip
80O717O117 Forwards IE Circular 80-14, "Rddioac. ttve Contanination of
Plant Demlnerainei) Mater Sljs & Resultant Internal
Contamination of Personnel " No written response required
O'REILLY, J P Region 2. Atlanta, Office of the Director. BO/06/24
IP
fl 007 17011 9 Forwards IE Circular BO-14, '•Radioactive Contamination of
Plant Deminerali ied Hater Bys !r Resultant Internal
Contam*nation of Pprsonnel " No uritten rs^ponsa requlrffd
O'REILLY, J P fteginn 2, Atlanta, Office of the Director SO/06/34
IP
BOO733027O Forwards I£ Bulletin 80-16, "Potential Hi 'application of
Rosemounb Inc Motfel s 1)31 & 1152 Pressure Transmitters
M/Either A or D Output Codes " Written response requir*d
IE Circular 80-16 also enc 1 No written response requirod
D'REILLY.J P Region 2, Atlanta, Office of the Director 80/06/27.
8007230270 Foruarils IE Bulletin BO-16, "Pntential Mi sapp I i cat i on of
Rosemounfc Inc Motfela 1151 !, i I aa Pressure Transmi tters
U/Either A or D Output Codes " Uritten response required
IE Circular BO-16 also end No u-ritten response required
D'REILLY.J P Reijion 2, Atlanta, Office of the Director BO/Oi/27
1°
DOCKET 50-405 NORTH ANNA PflHER STATION, UNIT 4
A Application/construction stage documents & correspondence
DOCKET 50-fl06 TUSKEOEE 1NST RESEARCH REACTOR
Q Inspection reports, IE Bulletins b correspondence
aOQ71701B9 Forwarrfi IE Circular SO-14. "Radioactive Contamination of
Plant Deminerali ied Mater Sys !< Resultant Internal
Cpnt ami nation of Personnel " No written responn required
O'REILLY.J P Region 2. Atlanta. Office of the Director 80/06/34
*P
BQ07a30001 Forwards statement of policy re i equ i rements to be mat for
current CL applications. as derived from NUREG-066O (< Found
in NUfleO-0(>94
EIBENHUT.D G Oivision of Licensinfl BO/OA/aii 2pp
6007010363 Responds to NRC 800421 request for iTifn on Category I
mnsonrij walls Design criteria will be developed uiilning
acceptable methodology No masonfy uiollj installed at
present
BRDHN, 3 C Virginia Electr-ic !< Power Co BO/O6/H7 lp
DOCKET BO-40? LA CfiOSBE B01LINO MATER REACTOR
D NRC Draft/Final Environmental Statements, suppls t> corr**pond*ncB
B007O2O402 Forwards revised Pages 5-11. -IE. -17 fc -31 to FES Including
corrections re occupational radiation exposure
CfltlTCHFIELD, D Operating Reactors Branch 5 BO/OA/11 Spp
DOCKETED ITEMS
257
— 8007020411 Revised Pages 3-1 1, -12. -17 t. -31 to FE8, includ ing
corrections re occupational radiation eiposure
* Operating Rear tor* Branch 5 BO/06/11 3pp
BQO7a3QS94 Requests that addl info on concerns re eicessive radioactive
ralia*** h inadequacy of dose assessment analysis expressed
in DES be Included in Final ETS Info should be available to
Bill participant* in review process for project
TAYLOR, B J Environmental Protection Agency BO/O7/03 2pp
BOO71BQ337 Submits State of HI Dept of Administration comments on
final E1B for facility Increase in spent Fuel assemblies
should have received eiplanation b documentation in final
ETS Description re age of fuel assemblies is unclear
NIELSEN, 0 A. Wisconsin, State of 80/07/OS 3pp
F- Bncurltiji nedicali emergency Si fire protection plans
BOQ717024O Notifies that FEMA/NRC steering committee reconsidered siie
of emergency planning tone for water cooled reactors of less
than 230 MU thermal ft adopted end position Proposed rule tt
NUREO/0&34/FEMA-REP-1 will be modified in conformance
CRUTCHFIELD, D M Operating Reactors Branch 3 80/06/13 3pp
BOO7I80079 Requests addl Info re fire protection mads, Status of
•valuation oncl, Response requested within 30 days of
raceipt of Itr
LAINASiQ C Assistant Director for Safety Assessment 80/06/16
— 80072BOi9fi Rept before 39th annual
UNDER, F Dainjland Power Cnopei
seting nf util
tive BO/O6/18
Up?
QOO7310101 Supplemental response to NRC Intel rogatories Identifies
individuals to LIB called in support of contentions Submits
elaborate discussion of radiation effects '( energy
conservat ion Affidavit t< Certificate of Svc one 1
HOHSC.A K , NVIiAARD, G R Affiliation UnVnoun 80/07/17 19pp
C00730042B Motion to file second round nF interrogatories dli
Cojlee Region Eiieigy Coalition Intervenor lengthy
supp 1 emental response to tlflC discovery requests will not bt
adequately addressed unless clarified W/Certi f i cste of 6vc
HDODHEAD.C P Hearing Branch J BO/G7/2E3 ftpp
800731040? Order deiign.it ing ASLD to com
rule upon requests for
hearing re Qfc nf Nuclear Reactor Regulation 000225 order to
sham cause re ui
ing sya Ad judl calory hesrinij.lf
determined, bhould be limited to tun issues stated in order
CUILK.S J Office of the 'Si-tri; tary of (he Commission BO/07/39
3Pp
H General correspondence
S007110321 Retpands to 900320 Itr re licensee withholding of info from
public an reactor operation ilpclsionb Licensee not required
to provide documents, to concerned pdrty since issue is not
under litigation
EiacNHOT. D G Division of Licensing BO/06/2A 5pp
8007390634 Forwards results of fire protection review re Item*
3. L, 27 i 3 S 3 on uater demand analysis Licenser should be
renumted to siodlfij high pressure svc uater/fire protection
wabar sys to provido protection for turbine lube oil tank
HAL.L,R E Brookhavan National Laboratory 80/07/53 3pp
— 8007140^27 EipreiBOB displeasure u/licenseo withholding of infn From
public re reactor operation decisions Repeated requests to
be included on svc list for correspondence to NI1C have been
ignored
PANTLE,W Coulee Region Enorgij Coalition 80/03/20 3pp
O Adjudicator^ correspondence
BOO7310B43 Forwards Commission B00527 mBmornndum t. order containing
decisions on UCS 7B030H petition for reconsideration of
7SQ413 momoranilum ti order UCS 77HO4 petition sought action
r» fir* protection for alectrical cables
eiBENHUTi D 0 Division of Licensing HO/06/2B S9pp
BO0714DD12 Second preheartnp, conference order outlining matters
discussed re new policy for procedural assistance to
intervenars. special circumstances in severe accidents &
Coulee Region Energy Coalition presentation on Full-term OL
HECHHOEFER.C Atomic Safety and Licensing Board Panel 80/07/08
fipp.
BOO71 30503 Order granting eitenalon until S00il6 for Coulee Region
Energy Coalition to respond to interrogatories Supplemental
ro«ponsBi must be filed by 900716 (• appl icant/NF!C aummary
dlaposltlon motions by BOOB04 Anticipates B009QB pretiaaring
BECHHOEFEB. C, Atomic Safety and Uicansing Hoard Panel 80/07/10
Sfp.
BO0717D36B Response to questions of ASLB SQ0521 msmorandum fe order r
proJiBaring conference in full term OL proceeding Addresnes
oPFg*i emlssloni discrepancies In FES, workers' exposure t
•nviron monltorina Affidavit & Certificate of Svc encl
HTEELE, T A i HIE8TAND, 0, 8 Dairyland Power Cooperative BO/07/11
80O7KQ069& Forwards supplemental response to NRC interrogatories
•Ralated correspondence end
MORSE. A Affiliation Unknown 80/07/17 Hipp
— 8Q072BQ699 Supplemental response to NRC Interrogatories Witnesses
listed h specific incidents at facility cited
MORSE.A K , NVCAARDiO Affiliation Unknown SO/07/17. SQpp
— B0072S067S Transcript of D Raphael before Senate Subcommittee on Rural
Development
RAPHAEL. D floral America. 79/11/30 llpp,
— BOO72B0677 Transcript of DL Dstendorf before House Subcommittee on
Conner vat ion h Credit
OBTENDORF, D, L Rural America 60/03/19 9pP
— B 00723040 4 "Nuclear Hast* Time Homb in Our Bones *
DIXON, 8 A Affiliation Unknown BO/03/23 E3pp
— BOQ73S0691 Transcript of R Freeman before House Subcommittee on
Conservation ti Credit
FREEMAN, R. Affillntlon Unknown, BO/03/19 JHpp
1 Financial information
B007310431 Forwards Annual Financial Rept 177? & certified financial
statements for 1970 (. 1979
LINDERiF Dairyland Power Cooperative 80/07/2fl lp
— S0073104fl3 Annual Financial Rept 1979 Certified Financial statements
for 1978 t 1979 end
« Dairyland Power Cooperative QO/09/19 47pp
P Operating license stage domments It correspondence
8007010130 ForunrifB final rule published in B00309 FR amending
locrn^o 71 to require periodic updating of FSARs Compliance
is not required until completion nf SEP
CRUTCHFIELD, D Operating React m B Branch 5 BO/06/1O Spp
S007100379 Responds to BOOSS9 Itr uhicfi eipresacd opposition to ACR8
recommendation tn restructure BEP Role of licensees in
program will expand Ltr forwarded to Comml Bsioners
DENfON.H R Office of Nuclear Reactor Regulntion, Director
BO/Oi/lB 4pp
— B007100'520 EipreBses opposition to rtCFiS recommetidation to restructure
BEP Fur SEP owners to perform -safety analysis as outlined,
cost in dollars fc manpower unuld incresse dramatically
SCHAFF5TAI L.R SEP Owners Oroup 80/0?/a9 2pp
B007O10O70 Responds to FQ1A request for 57 documents referenced In M
Tokar memo to ACR1) concerning pel let-clodding interaction
Forwards documents Missing recnrda are duplicative,
superseded or available elinuihere
FELTON:J M Division of Rulei and Records BQ/O6/20 2pp
--B0070100B8 Disrusnes aimilaritiBB in fuel fod failures Por DURs
resulting from inntrol blndo movemnnt-i Failure pattwrn
w/Dresilen li LACDUR Fuel rnds was a^snciflted w/location of
fuel rods relative to control rod"!
BIEGEL.D L Atomic Energy Cnmmis-iioni Direttorato nf Licensing
73/09/20 2pp
S007240079 Requests rfddl info to continue review oP adequacy of station
electric distribution sys voltages Response requested within
45 days of receipt oP Itr
CHUTCHFIELD. D M Pperating Reactors Branch 5 B0/0fc/a7 4pp
900721063B Forwards "SEP Technical Evaluation Tnpic V11I-4, Electrical
Penetrationn of Reactor Containment I ACQWR "
CRUTCHFIELD, D M Ojiuratin!) Reactors Branch 5 80/07/01 2pp
Z58
— B007210fc10 "SEP Tr>T(inical Evaluation Topic VI 1 1-4, Eloctrical
Penetrations uf Hector Containmedt LACDHn "
" aperatinn IH-attors Brunei, •> HO/07/01 tpp
t3O07uBt)3QO- Forwards drawings providing addl info re •safe ihutdoun.
requested by NBC 0004,10 telecopij
SHIMSHAK.H Dairy land Potae-r Cooperative 80/07/02 3pp
— B007080305 Reqi.
MAYS, H Ccmfl
shutdown by B00707
BOO71B03L>5 Responds to IE Bulletin 80-OB, "Elimination of Containment
Liner Penetration Uelds "Facility has no containment
penetrations utiliilng Flued head design Three penetrationn
u/c ontainmpnt boundary butt UP Ids used
LINDER.F Dairyland Power Cooperative GO/06/13 3pp
6007030032 Forwards IE Bulletin BO-19, "Possible Loss of Emergency
Notification Sija (ENS) U/Lnss of Offsite Pauier " Written
response requn ed
KEPFLER.JG Region 3. Chicago, Office of the Director BO/06/ IB
BOO714O305 Notifies that Hem 1 of TMI Lessons Learned requirements was
not forwarded iu/HHr BOO5Q7 Itr ^ lias not yet been receives
LINDER.r Dainjland POWIT Cooperative BO/07/07 lp
0007210447 Forwards revicm of RCS pi-assure boundary stainless steel
p iping & Pitting mail
LIMDEH.F Dairylam) Power Cooperative BO/O7/10 18pp
B0072BO170 Foriuards NRC evaluation oF BEP Topics 111-10 A.V-11 A,
Vl-/ 0 1 << II1-3 D Evaluations will be basic inputs to
integrated t>nfety a-ss o- a smetits, unless changes are needed to
reflect as-tiuilt conditions
CRUTCHFIELB, 1) Operating Redactors llranch 5 BO/07/10 ISpp
0007220635 Forwards "Response to MIC Rnview Questions" re util answer
to UOO329 order to shoiu cause
LINDER.F Dalryland Power Cooperative BO/O7/14 Ppp
B0070a037B Foruiarda IE Circular BO-19, "Lnsa of Reactor Coolant Puap
Cooling & Natural Circulation Cootrfouin " Ha written response
required
KEPPLER, J 0 Region 3, Chicago, Office of the Director BO/06/2O
IP
00071B0363 Responds to IE Bulletin BO-Oi, "Engineered Baf«t« Ftatura
(ESF) Reset Controls " Safety-related functions noted to
reset upon removal of actuating signal listed In end App t\,
in/proposed mods defined
LINDER.F Raii-ijland Power Cooperative SO/Oi/aO Spp
SOO7170479 Forwards IE Circular SO-14, "Radioactive Contamination of
Plant Damineral 1 led Hater Sys & Resultant Internal
Contamination of Personnel " No written response required
KEPPLEfl, J 0 Region 3. Chicago, Office of the Director BQ/06/24
— B007a205EA "ReipoiisB to NRC Revieu Questiona. " prepared for util
EINGH.H Dames t, Hoore DO/07/11 74pp
a0072B007i> Re5ponds to 800318 Itr tg J Ahearne objecting, on behalf of
nuners of plants under EEP review, to current plans far
aipctfitfid review nF environ qualification of electrical
equipment Fnruiarda applicable mem n rand Dm ti order
DCNTON.H H Office of Nutlear fleactor Regulation, Director
BO/07/I& 4pp
II Inspection repoitb, 1L Dulletins !t correapondenco
8007 IB 009 3 Deanonds to IE Bulletin 00-19 re possible loss of emergtncy
notification sys in/lass of offaite power Emergency
notification ays is powered offslte from reliable pouor
supply baited by batteries & dieeel generator
LINDtR.F Dalrijland Power Cooperative BO/06/23 2pp
B007230320 Forulards IE Bulletin BO-1A, "Potential Misapplication of
RoaBmoutit Inc Models 1151 & 1152 Pressure Tranemitters
U/Elther A or D Output Codes " Written responne required
IE Circular 00-Ii also Bnc 1 No written response required
KEPPLEfl, J 0 Region 3, Chicago, Office of the Director BO/06/27
Formarrts IE Bulletin BO-13. "Cracking in Core Spray
Spargers " MrittPTi response required
KEPPLER, J 0 Region 3, Chicago. Office of the Director E10/03/12
BO 0722 0096 Submits reply to IE Bulletin BO- 16 re misapplication of
certain Rosemount pressure transmitters Transmitters are not
used in safety-related or other circuits
LINDER.F Dairyland Pouier Cooperative BO/O7/07 lp
D007Oao05B hoi-uarda IE Info Notice 60-22, "Hi oakdowns In Contamination
Control Pr-oaiam6 " Nn written lOBoonse required
KEPPLER, J O (legion 3, Chicago. Office nf the Director BO/03/30
lp
B007380050 Responds to IE Bulletin 60-10 re contamination of
nonradiaactive ays & resulting potential for unmonitorEdi
uncontrolled release of radioactivity to environ Instrument
air used in containment bldg la protected by check valvn»
LINDER,r Dairyland POUHT Cooperative 80/07/11 4pp
HOQ70101I2 Foruai-ds IE Info Notice BO-23. "Loss of Suction to Emerijen
FoeduatBr Pumps " Ma urltton rDspoiise required
KEPPLER, J G Reginn ',1. Chuaga, nffice of the Director 00/05/S9
IP
QC-07020679 Bulimifs further re-ipunso to IF Bulletin BO-07,
Pump Assprnbly Failure "
LINDER.r Dairyland Pnwar Cooperative SO/O6/03 lp
0071000i3D Foruiords IE Insp Hept 30-409/79-24 on /91337-3Q No
nancompl iant e noted
DAVIS, A B Region 3, CAicaao, Fun 1 Facility !. Materials Safety
Branch BQ/Oi/03 Spp
8007S7O4BO Responds to IE Bulletin 80-11 LACDHR containment bldg has no
masonry uialls Four identified in turbine bldfl No BSE
Hatabllahed No separate masonry mails re-evaluation planned
at present Evaluation mill be part of SEP
LINDER.F Dairyland Power Cooperative BO/07/16 3pp
BOQ7300244 Verifies that action specified In util B00711 Itr rt It am 2
of IE Bulletin BO-10, "Contamination of Nonrad ioactive Scf« t,
Resulting Potential for Unmoni tored, Uncontrol 1 ed Release of
Radioactivity to Environ," completed on B00714
LINDER.F Dairy land Pouer Cooperative BO/07/ IB lp
H Periodic operating reports & related correspondence
--B007JOOOE!1? 1C Insp (fop* 50-109/79-2-fl on 791227-23 No noncomp 1 lance
noted Major uiear> inspected licensee actions per IE Bulletin
77-19 T-Q packaging of low level radwante for transport tt
bur 1 al
FIEHEU.W L Region 3. Chicago. Fuel Facilitv t. Materials Safety
Branch ORiZGER, L B Region H, crucago. Office of the Director
BO/06/03 4pp
B0071&0&77 Forwards monthly operating rept For June 19BO
LINDER.F Dairyland Pouer Cooperative BO/07/OB lp
--B0071ciOA01 Monthly operating rept for June 19BO
GOODMAN, L B Dairuland Pouior Cooperative BO/O7/D7
300'72aO195 Foriuarda IE Info Notice HD-S6, "Evaluation of Contractor
•OA Prooratns " No written reoponsa required
KEPPLER, J D Rpgion 3, Chirogn, Office of the Director BO/Oi/10
DOCKET 30-410 NINE MILE POINT NUCLEAR STATION, UNIT 3
A Application/construction stage documents b correspondence
D007140371 Responds to IE Bulletin 79-03A. "Longitudinal Ueltf Defects
in ASME BA-312.Typ« 301 Stainless Steel Pipe " No A-312
i tain lefts stttel fusion we Id ad piping is in use In safety-
related piping at facility
LINDEFt,F Dalryl.inil Pouier Cooperative BO/Oi/13 2jip
B00731017i Forwards NflC evaluation of OE rept. NEDE-S4010-P t> Buppli
1-3. "Technical Basis for Use of SquarB~Root-of-9um-of-
Bquares (BHSS) hethod for Combining Dynamic Loads for Marl
II Plants " Rapt acceptable subj to certain constraints
MATTSON, H J Division of Safety Technology aO/Oi/35 3pp
S 00 7230001 Forwards statement of policy re requirements to ba met for
current QL appl ications. as derived from NURE 0-0660 t, found
in NUREO-0694
EIBENHUT, D 0 Division of Licensing SO/06/S6 9pp
259
B007080337 Responds to SA Varga B004H1 request For info on Category 1
BBOonru valid Concrete masonry walla uiill not be used in
Category [ structures
RHODE, 0 K Niagara Mohawk Power Corp BO/07/02 Ip
BOO72306S1 Summary of BOOMS meeting ui/Marh II Dinners group in
BetNsido.HD re leed plant closure & long-term program Mods
should b* mad* to generic lead plant condensation
oscillation !• chugging pool boundary loads Vieugraphs end
ANDERSON. C J Generic Issues Branch BO/O7/O3 57pp
BQO718O32O Forward* request for addl info re geologic investigation of
BitB
YDUWODLOQD, D J Licensing Branch 1 80/07/09 9pp
8007310624 Butnmary at HOOt.10 meeting lu/util in Bethesda.MD re melding
defects in biological shield wall
KIPER.K L Licensing Branch t SO/O7/09 3pp
6007290472 Informs of util schedule for setting biological shield wall
Ii reactor pressure vessel Biological shield wall setting
•cheduled for 800726-0829 fc reactor pressure vessel for
BOOfKM-ia
LEWCE8, T E Niagara Mohawk Pourer Corp 60/O7/18 Ip
OOQ72S0173 Notification of GOOBOS meeting w/reprosentatives from Mark
II owners group in Chicago, IL to discuss lead Mark II plants
chugging h C/0 load spacs
ANDERSON. C Generic Issues Branch HO/07/23 2pp
00071B0553 Foruiardu IE Insp Rept bO-410/80-03 nn 600421 No
noncompl lance noted
CARLSON. R T Region 1. Philadelphia, Reactor Construction t.
Engineering Support Branch 30/06/13 2pp
— 8007180561 IE Insp Rept 30~410/BO-03 on 800424 No noncompl ianco noted
Major areas inspected reactor b Idg. primary containment
turbine hldg, water intafce structure area & area of ground
Fault
CERNG.A C . FEIL.R A Region 1. Phi Ifldolph ia. Office of the
Director MCQAUQHY, R W Region 1. Philadelphia. Reactor
Construction ft Enginoenng Support Branch aO/Oh/09 3pp
B0072BQ603 Foruiards IE Info Notitc 80-28, "Prompt Reporting of Info in
Accordance U/10CFR5O 55<e> " Nu uritten response required
QR1ER.B H Region 1, Philadelphia. Office of the Director
80/06/13 Ip
BOQ703Q311 Forwards IE Circular BO-15. "Losa of Reactor Coolant Pump
Coaling It Natural Circulation Cnoldown " No untton response
raquired
GR1ER.B H Region 1, Philadelphia. Office of the Director
BO/06/30 Ip
B007160717 Forwards IE Circular BO-14. "Radioactive Contamination of
Plant Deminerali zed Water Sys & Resultant Internal
Contamination of Personnel " No written rcsponsfl requirod
SR1ER.B H Region I, Philadelphia, Office of the Director
SO/Qi/24 Ip
8 Ad judlctttorg correspondince
BO07310343 Foruiards Commission 800927 memorandum ti order containing
daelalons on DCS 780502 petition for reconsideration of
7BO413 MOMorandum b order DCS 771104 petition sought action
re fire protection for electrical cables
EISENHUT.D 0 Division of Licensing B0/06/a3 B9pp
I. Financial information
(3007310310 Forwards IE Info Notice BO-24. "Lou Level Raduasts BurisI
Criteria " No urittan response required
QRIER.B H Region 1, Philadelphia. Office of the Director
80/06/35 Ip
8007230131 Forwards IE Bulletin BO-16. "Potential Misapplication of
RosBmount Inc Models 1131 & I1S2 Pressure Transmitters
H/Elther A or D Output Codes " Written response rcnuirud
IE Circular 80-16 also end No uiritten reapnnse required
ORIEH.B H Region 1, Philadelphia, Office of the Director
80/06/37 2(1 p
BO07S-e027S Forward! util Annual Financial Rept for 1979.
LEMPOEBiT E Niagara Mohawk Pnuir Corp BO/O7/22 Ip
B Reportable occurrences. LERs It related torrespondenca
H Antitrutt corraipondence
B007990933 Reoponifl in opposition to City of Cleveland, DH 60060"?
renmtt for hiarlng re Director of Nuclear Raactor
Ragulatlon G00313 ordor Fi 1 lng> requesting tariff u/FERC,
bring* controversy to end u/o lltigous course
REYHOLDB, W B , IAHLER, R, E. Cleveland Electric Illuminating Co
REYNOLDS, H B Ghau, Pittman, Pottt t- Troubridge BO/07/B9 9pp
O Inipectlan reports. IE Bulletins & correspondence
B007030111 Ack receipt of BOOSI2 Itr foruiarding Interim deficiency rept
n environ & seismic qualification of electrical equipment
Ript uill be reviewed & evaluated
CAHL50N.R T Region 1. Philadelphia, Office of the Director
60/05/30 Ip
BOD702ODO4 Foruards summary of 800507 meeting re biological shlild uitl
ueld defect problem Util uaa informed that NRC mould conduct
Insp an BQ0312 to review work In progress
CARLSON, (1 T Region 1. Philadelphia. Reactor Construction b
Engineering Support Branch 80/06/03 3pp
8007140499 Forwards IE Bulletin 80-13. "Cracking in Core Spray
Spargers " No written response required
WUER.B H, R«aion 1. Philadelphia. Office of the Director.
BO/03/12 Ip
DOCKET 30-413 BEAVER VALLEY POWER STATION. UNIT 2
A Application/construction stage documents & correspondence
8007210201 Forwards IE Imp Rept 50-410/00-03 on B00317-21 & 0410-11.
No noncompltancfl noted
CARLBONiR T (legion 1. Philadelphia, Reactor Construction h
Engineering Support Branch BO/06/O3 Hpp
B007230001 Forwards statement of policy re requirements to be met far
current OL applications, as derived Prom NUREQ-O&6Q l< found
in NUHEG-Q694
EIBENHIJTi D B Division of Licensing 60/06/26 3pp
—8007210209 IE Inup Rept 30-410/QO-OH on 800319-31 « 0410-11 No
noncoinpliance noted, Major areas Inspected reactor pressure
vesial internals storage. biolog ical shield wall itatui b
plant inep tours
CERNE.ft C , KCBREARTY. ft. A Region 1. Philadelphia, Office of the
Director MCGAUQHV.R W Region 1, Philadelphia. Reactor
Construction b Engineering Support Branch BO/03/09 9pp
0 Ad judlcntory correspondencB
H 0073 10343 Forwards Commission BOOS27 memorandum ti order containing
decisions on UC9 780303 petition for reconsidoration of
7B0413 memorandum t, order UCB 771104 petition sought action
re fire protection for electrical cables
EIBENHUT.D 0 Division of Licensing BO/06/23 Q7pp
BOO7020302 Requenti addl info re actions taken to preclude occurrence
of cracking described in IE Bulletin a 0-07 Also requests
commitment to adapt whatever long-term solution is approved
, R L Assistant Director for Licensing, 80/06/10, 2pp
BOO72 10370 Forwards IE Info Notice B0-26i "Evaluation of Contractor
OA Program* " No uritten response required
ORIEKiB H Region 1, Philadelphia, Office of the Director.
BO/06/10 Ip
BO07140264 Forwards IE Bulletin 80-14, "Degradation oi> BUR Scram
Discharge Vol Capability " No uirltten responi* required,
6RIEH.B H Region 1. Philadelphia. Office of the Director
BO/06/12. Ip
Q Inspection reporta, IE Bulletins (* l:Qr^espondBn^:B
8007010394 Forwards IE Info Notice BO-33, "Loss of Suction to Emergency
Feed ua tar Pumps " No written responsp required
QRIERiB H Region 1> Philadelphia. (IPfica of the Director
80/03/29 Ip
8007310563 Foruiards IE Info Notice 80-26. "Evaluation of Contractor
OA Programs " No urittan response required
SRIER.D.H Region i. Philadelphia. Office of the Director
BO/06/10 Ip
260
DOCKETED STEMS
8007160345 Formal-da IE Info Notice BO-S7. "Degradation of Reactor
Coolant Pump Situds " No spenfic oction or response
required
OUTER. I! H Region 1, Mh 1 1 site 1 ph la, Office of the Divoctor
DO/O&/11 lp
B007S30001 Foruiarrfa statement of pollen re requirement! to b» «»t for
current 01- app 1 ications, as derived from NUREO-0660 61 found
In NUDE 0-0694
EISGNHUT.D 0 Division of Licensing BO/06/2i 2pp
Forwards IE Info Notice FJQ-3S, "Prompt fleportinfl of Info in
Act urdance H/IOCI'liSO 55(8) " No written Tesponte required
GHIEH.H H Region 1. Phi ladelphin. Office of the Director
HQ/0&/I3 lp
80071HOO!)') desponds to IE Bulletin BO-0? "Hyitrnmotor Actuator
Dof ItlBTicieH " Dumpers u/lTT Getioral Controls NH-90
nctuatora purchased tut not Bdinpud Vendors re-oval uiitlng
selections t< utll rnptlfy thnt steel is Tijpp I060-107D
, C J Uiiquusne Light Co. BO/06/17 2pp
nOQ7O20Ei04 Forwards IE Circul.tr BO-15, "Liiso of Reactor Coolant Pump
Coaling A Ndtur.nl Ci rtulat i on Conldoun " No written response
OFIIEIt, D H Hog i nn 1, Ph i 1 n.Iel ph in. Offi
E30/Q6/2O tp
nf the Director
3QQ71iOfc73 Forwnrda IE Circular HO-14. "Rfldloacl ive Contamination of
Plant Uuminicrnl 1 1 ed Mater 8ya t< Resultant Internal
Contamination of Personnel " No written response rsquirBil
, II H Region 1. Philadelphia Office of the Director
lp
B0070 1 031D lloEspnnilo to NBC f!QOH27 Itr re violation noted in IE Insp
Hi?pt H0~*l 12/130 1)4 Corrective nctln-ns nine meltla uioro re-
rndioflraphod f< manually pi-ntOBBPd Machine mill not be
utillind on film upplicablo to AHKE Suction III unltts
WDUL£VEH,e J Diiquoane Liflht Co HO/06/3S *,pp
0007yi017U roTtnard* IE InCo Notice 00~aHi "Lou Level liaduantB Burial
Criteria " Nn written Tesponae required
ORIER.D H Hug ton I, Philadelphia, Office of the Director
00/06/33 lp
B(K>7a30113 rorunrdg IE nulletin QO-16. "Potential Ml anpp 1 ication of
Wo B amount I TIT Mode IB 1131 & 113? ProBsure Trnnsmltters
M/tlthur A nr 0 Output Codas " NrlttBii resjionae required
IE Circular OO-l/i ,)lQn Dficl No urltten rDaponne rtijulruiJ
QRKttt U II Kogian 1, Ph Uailel ph iu, Office of the Director
BOVOib/2/ 2pp
BOu/31001/i Hooponda to IF llullotin 79-03rt re long 1 turiinul weld defetts
In ASHE SA-TJIH typn fitainloEO steel Plpo 301 Piping iijB It
Dirbj to deelni) DtTcsspo groat or than H5'/. of allouanco No
•Action mqulred
WOOLEVEFf. E ,J Dunutfnne Light Co BO/O7/07 lp
fl Pifrlodic opernlln-g rcportn t rolatod
Fnrujrda magnetic (.spu rDiitalTiillfl mnteorologlcal data for
1979 Tape ovollnblo ab Hijdriilogy-MetooroloDij Branch only
8ICBFF1.J U Duquoflna Light To 50/07/31 9pp
0 Heportible i>c< nrrcncus. LCRs !< relnbcj correspondence
BO07030185 Foruarda application for amend to CFPH-116 conailtlng of
addition of no-aunqro b co-applicants
PORTED. W L DukB Power Co BO/07/01 3pp
— -BOO7Oa01B9 Applirotion for amend to CPPFt-lli re sale of 36.23*
undivided ownership in Unit 1 d SB 157. interest of i up port
facilities to NC Electric Membership Carp I> IB 75X undivided
Duinership to Baluda River Electric Cooperative
DAIL.L C Duke foyer Co HUBDAIiD, J H North Carolina Muncipallu.
Ouned Electric Systems Aaaonation BO/07/01 ^Spp
Q00731O176 Forwards revised application for amend to CPPR-lli adding
co-nunerB t, co-uppl icantB
PORTER, W L Duke Power Co BO/07/14 lp
— S00721O486 Revised application for anjand to CPPR-116 adrilnn MC Electric
Membership Corp & Saluda River Electric Cooperative. Ine- u»
co~ounerB t, co-applicants
DrtlL.L C Duke Pnuer Co HUBBAHD, J M North Carol in* Elictrlc
Membership Carp FARISiH M Baluda River Electric
Cnoporative, Inc BO/07/01 .17pp
0 Ad judicatory corratnondence
B007aiO343 Forwards ComnlsslDn BOOB27 mttmorandun h order cantitnlng
decisions on UCS 7SO50Z petition for rBcanBli)«ratlon of
7BO113 mcmnrandum ti order *'CB 771104 petition sought action
re fire protection for electrical cables
EISENHUT, D Q Division of Licensing BO/Oi/23 B9pp
M Antitrust corruspondonco
Q007160607 Foriuarda info requested by Attu Oeneral re util H00701
application for CP amend adding CD-owner 6 b co-applicants
Antitruot advice per Atomic Energy Act v«que«ted H/o enc 1
SHAPAR.H K Office of the Executive Legal Director BO/07/11 lp
Q Inspection reports. IE Bulletins & correspondence
BOD7240122 Forwards IE Info Notice 00-20, "Loss of Decay Heat Removal
Capability at Davla-Uesse Unit 1 While in Refueling Hoda "
No response required
O'HEILLY, J P Region 2, Atlanta, Office of the Director BO/03/08
2np
0007020304 For ward 6 IE Info Notice 80*22. "Breakdowns In Cent ami nation
Control Programs " No written response required
O'REILLY.J P Region E. Atlanta, Office of the Dirsetor BO/05/28
IP
H007210149 Forwards IE Circular 00-13, "Grid Strap Damage in
UestlnghousH Fuel AsBtimb 1 lea " No written responia riquirad
O'REILLY, J P Region 2, Atlanta, Office of the Director 80/09/29
lp,
E1QO7CM04!J<7 Supplement 3 to Port 31 ropt re failed thrust bonrlng Insp
complete Crankshaft thrust hearlnni on tuin diosel generators
ore tree of reportml potential defect
MOJlIrtfTYi .1 It Colt Induntrlea, Inc . Fairbonka Morse Engine Div,
SO/ Oft /HA lp
B007ia(333-l ftch receipt of DOO521 final deficiency rept ro crane wall
reinforcing steel NHC has no further questions
CARLBtlN, It T nuflion 1, Philadolpliis, Rejctor Operations Nuclear
Bujlport ]] ranch GO^O&/27 lp
G007a?0(JftO Acfc recalpt o-F H00616 final deficiency ropt re weld
dl-scronnnc ice in reactor voasel support structure
CrtflLGON.lt, T Heglnn 1, Philadelphia. Reactor Construction t>
Engineering Support Branch 00/07/07 IP
8007010213 Forward 5 IE Info Notice 60-23, "Loss of Suction to Emergency
Feedwater Pumpn " No written response required
O'flEILLY. J P Region H, Atlanta, Office of the Director. 80/03/29
IP
ao073ao04B Forwards IE Info Motlco 80-06. "Evaluation of Contractor
OA Programs " No written response required
O'REILLY.J P Region 2. Atlanta, Offico of the Director DO/Oi/10
2pp
B007160259 Forwards IE Info Notice BO-87. "Dearadatlon of Reactor
Coolant Pump Studs " No specific action or response
required
O'REILLY.J P FJegion a, Atlanta, Offico of the Director 00/06/11.
tp
DOCKET 30-413 CATAWUA NWCue^n STATION. UNIT 1
A Ap p t icat J on/construe t i on stage documents & correspondence
B007S30344 Forwards IE Info Notice BO-28, "Prompt Reporting of Info In
Accordance M/10CFR3D SSfe) " No uritteii response required
O'REILLY, JP Region 3, Atlanta. Office of the Director BO/OA/13
app
0007010IO& Advises oP reorsani intion of Ofc of Nuclear Reactor
fingulatlofl' cffoctive 000438 Mgt of all licensing matters for
facility has beun assigned to J Matovc Drganliational
dB»trtptlon anil
TCDESca,R L Assistant Director for Licensing 90/06/13 Upp
B0070204S9 Forwards IE Circular B0-15i "Losa of Reactor Coolant Punp
Cooling & Natural Circulation Cooldown " No written response
required
O'REILLY.J P Renion 2, Atlanta, Office of the Director. HO/OA/20
IP
DOCKETED ITEMS
261
BQ071O0417 Aeli receipt of BQ032B Itr informing NRC of stops taken to
correct violations noted in IE Imp Rapts 3O-413/BO-O5 t
50- 414/80-03
MURPHVi C E Region Si Atlanta. Reactor Construction t. Engineering
Support Brunch 80/04/23 ip
— BO0710O419 Responds to NRC 600505 Itr re violations noted in IE Insp
Rvpts OO-413/BO-03 b 30-414/BO-OS Corrective actions
Individual cited In Insp rept has mat all requirements for
Level 2 t> has been so certified
PARKER, U D Duke Pouier Co 60/09/28 3pp
— BOO71O0423 Forwards IE Insp Hepts 30-413/80-03 t 50-414/00-09 on
8OO305-31 & notice of violation
MURPHY, C E Region 2, Atlanta, Reactor Construction t Engineering
Support Branch BO/03/05 Spp
— 80O710043& Notice of violation from imp on B003Q9-31
« Region 2, Atlanta. Office of the Director BO/O4/05
2pp
— BQ07030189 Application for ampnd to CPPR-1 16 re sale of 5<b 35V.
undivided ownership In Unit 1 ft 2B 1 SK interest of support
facilities to NC Electrir Membership Corp f, IB 75V. undivided
nwniirship to Saluda River Electric Cooperative
DAIL.L C Duke Pouier Co HUDBARI), J M North Carolina Muncipally
Dunod Electric Systems Association BO/07/01 49pp
5007210476 Forwards revised application for amend to CPPR-1I6 adding
co-Dinners b co-applicants
PORTER. W L Duke Pouor Co 60/07/14 Ip
— BQQ731O4Bii Revised application for amend to CPPR-116 adding NC Electrii
Membership Corp t, Snluda Fliver Electric Cooporal i vc-i Inc, as
co-ouners (. t n-app 1 icants
DA1L.L C Dufce Power Co HUBBARD. J M North Carolina Electric
Membership Corp PARIS' H M Saluda River Clectnc
Cooperative, Inc (30/07/01 17pp
0 Adjudicator^ correspondent
— BO07100432 IE Imp Repts 30-413/BQ-05 b 30-414/BO-03 on B00305-31
Noncompliance noted Failure to provide adequate procedure
for rigging near Class IE equipment & failure to folium
drawing requirements
MAXWELL, O F Region 2. Atlanta, Office of the Director
RAUSCH, J K Region S. Atlanta, Reactor Construction & Engineering
Support Branch SO/OS/OS Itpp
BO07170104 Forwards IE Circular BO-14, "Radioactive Contamination of
Plant Demineraliied Hater Bys & ftonultant Internal
Contamination of Personnel " No written response required
O'REILLY, J.P Region 2, Atlanta. Office nf the Director BO/06/24
BOO7310243 Forwards rommisaton 800537 memorandum *< order containing
decisions on DCS 7B03QE petition for reconoirteratlan of
7B0413 memorandum fc order UCS 771104 petition sought action
re fire protection For electrical cables
EISENHUT.D G Division of Licensing BO/06/39 B7pp
M Antitrust cor respond one
8007160607 Forwards info requested by Atty General ra util B007O1
application for CP amend adding co-ouners tc co-npp 1 icants
Antitrust advice par Atomic Energy Act requested W/o encl
BHAPARiH K Office of the Executive Legal Director BO/O7/11 Ip
3007230333 Foruardi IE Bulletin 80-16, "Potential Misapplication of
fla**mDUnt Inc Modela 1191 tr 1132 Pressure Transmitters
H/Eith*r A or D Output Codes " Written response required
IE Circular BO- It alia *ncl No written rgsponse required
0'REIL,LY.J P Rvgian 2, Atlanta, Office of the Director BO/06/H7
Ip.
BO072102ol RBspondi to IE Bulletin 80-OB, "Examination of Containment
Lin*r Penetration Welds " Uelds in 13 penetrations repaired
«> remit of nondestructive sjaminatian auramarn oF tijpo» h
*imi of penetrations encl
PARKER, H D Duke Power Co BO/07/07 7pp
S, Reportable occurrences, LERs & related correspondence
BO07020337 DeFicloncg rept re Faulty connections In electrical
equipment As deicribad In BOOS01 Deficiency Rept
SD 413-414/BO-01,all Unit 1 safety-related motor control ctr
equipment has been inspected d necessari) mods completed
PARKER, H 0 Duke Power Co BO/06/ IB Ip
8Q071&0914 Forwards deficiency rept re rejectabls Indications In
Heldlng of containment vessel equipment hatch
PARKER, M, 0 Dude Pouier Co BO/07/11, Ip
— BOO71i031B Deficiency rept re rejectatHe indications in welding oF
containment vessel equipment hatch Rejectable meld areas
ground out & ueld repaired per approved procedures Repaired
areas examined & found acceptable on SQOill
It Duke Power Co SO/07/ 11 Ip
B0072S0301 Significant deficiency rept re centrifugal charging pump
operation following secondary side high energy line rupture,
initially reported BOO&17 Inadequate min flow may result in
degraded pump performance Hestinghouso reviewing problem
PARKER, H 0, Duke Pouier Co BO/07/17 2pp,
DOCKET 30-414 CATAWBA NUCLEAR STATION, UNIT 2
A, Application/construction stage documents d correspondence
800701 01B6 Advises of reorganl ration of OFc of Nuclear Reactor
Regulation' efFectlve BOD4SB Ngt of all licensing matters For
facility has been assigned to J Ma tori Organizational
description and,
TEDESCO.R L. Assistant Director for Licensing, BO/06/13 llpp
BO072300Q1 Foruiard* statement of policy re requirements to be met for
current OL, applications! as derived From NUREO-OiiO & found
in NUHEOHWM
E1BENHUT/D, 9, Division of Licensing BO/06/26 Epp,
BOO7O301S3 Forwards application for amend to CPPR-116 consisting of
addition of co-owners & co-applicants
POTTER, W,L Duke Power Co BO/07/01 Gpp
0 Inspection reportH, IE Bulletins & c nrrospondonc a
8007340133 Foruiards IE Info Nntice 00-20, "Lnis of Docav Heat Removal
Capability at Davis-Desse Unit 1 While in Refueling Mode "
No responae required
O'BEILLY.J P Region 3. Atlanta, Office of the Director 80/05/OB
2pp
B007210449 Foruards IE Circular 00-13, "Grid Strap Damago in
Uastinghouae Fuel flsEemblies " No written response required
O'REILLY, J P Region 2, Atlanta, Office of the Director BO/09/SH
IP
B007010213 Forwards IE Info Notice flO-23, "Lois of Suction to emergency
Feeduater Pumps " No written response required
D'REILUY.JP Region 2, Atlanta, Offire of thn Director BO/05/39
Ip
B007S2004B Foriuards IE Info Notice SO-26. "Evaluation of Contractor
QA Programs " No written response required
O'REILLY, JP Region 2. Atlanta, Office of the Director BO/06/10
2pp
0007160333 Forwards IE Info Notice 80-27. "Degradation of Reactor
Coolant Pump Studs " No specific action or response
required
O'REILLV.JP Region 2, Atlanta. Office of the Director BO/06/11
B007250344 Forwards IE Info Notice 80-28, "Prompt Reporting of Info In
Accordance W/10CFR50 !)3<e> " No written response required
O'REILLY. J P Region 2, Atlanta, Office of the Director BO/06/13
2pp
B007020439 Forwards IE Circular BO-13, "Loss of Reactor Coolant Pump
Cooling & Natural Circulation CDoldoum " No written response
required
O'REILLY, J P Region 2, Atlanta. Office of the Director 90/06/20
B007100417 Ack receipt of 80032B Itr informing NRC af stops talen to
correct violations noted in IE Insp Repts 50-413/BO-08 ft
30-414/BO-05
MURPHY, C E Region S, Atlanta, Rear-tor Construe t Lon fi Engineering
Support Branch SO/06/S3 Ip
— B007100419 Responds to NRC 600303 Itr re violations noted in IE Insp
Rapts 30-413/80-03 & 50-4H/BO-03 Corrective actions
individual cited in inap rept has met all requirements for
Level 2 6 has been so certified
PARKER, U 0 Duke Pouor Co BO/05/2H 3pp
— 8007100423 Forwards IE Insp Ropts 50-413/60-05 t, 9O-414/SO-03 on
800305-31 tt notice of violation
MURPHY, C, E Region 2, Atlanta, Reactor Construction & Engineering
Support Branch BO/05/05 2pp
262
DOCKETED ITEMS
— 0007100436 Notice of violation frnm map on 000305-31
a Region 2. Atlanta. Office of the Director BQ/04/05
2pp
— B007100433 IE Insp Ri-pta SO— 113/BO-Ob f, 50-414/BQ-O5 on B003Q5-31
Woncnmp 1 lance noted failure to provide adequate procedure
for rigging near Class 1C equipment (. failure to follow
drauina requirements
MAXWELL. G F ttegion 3, Atlanta, Office of the Director
RAUSCH, J K Region a, Atlanta. Reactor Construction Si Engineorinn
Support Drdnch BO/OS/OI llpp
G007240JH7 Sumniai IJ of B00633 meeting in/applicant in Gaithersbur(|i HO ro
instrumentation !i rontral oys question;, t, response fc
discussion op rouiew schedule
HDUOHrON,T C LicenGiiio Dranch 3 QQ/O7/03 7pp
(3007200494 Forwards respDnnc to IO remaining open issues in diaft SER
Info covers seismic subsystem analysi s, ace eptflnce criteria
for steady state piping vibration (• presurvice t, innorvtco
pump tt valve testing
DALE.L F Mississippi Pauer (. Light Co 00/07/OH 13pp
S007I70I01 Forwards JE Circular 60-11, "Ram oac tl vfl Confirmation of
Plant DemlnBraliiBtJ Wator Stjs t. Resultant Internal
Contamination of Personnel ' No written response required
O'REILL-V.J P Region a. Atlanta. Office of the Director 80/06/24
IP
BGQ723Oaj5 Forwards !£ Bulletin flO-lb. "Potential Misapplication of
Rosamount Inc Models 1191 t, 1153 Pressure Transmitters
M/Either A or D Output Codes " Hritten response required
IE Circular BQ-li, also encl No written response required
O'REILLV.J P Ileoipn 3, Atlanta, Office of the Director 00/06/37
lp
H007210241 Responds to IE Bulletin BO-OB, "Examination of Containment
Liner Penetration Hfflds " Weldu in 13 penetrations repaired
d9 remjlt at nondestructive eiamination Summary of types t,
siiHB of penetrations encl
PVUMEflpW 0 Dute Pouer Co BO/07/O7 7pp
WeporlaDle net urre-nceai LERs & related cnrreHpondence
BOO7020537 Deficiency rept re faulty connections in electrical
equipment As described in 600201 Deficiency Flept
3D 113-1H/BO-OI,all Unit 1 saf etu-related motor control c tp
equipment has been inspected & necessary mods completed
PARKER, W O Duke Pnuer Co 8Q/0&/10 lp
DD0722O5A9 Foryarda "Cultural Reaourcea Survey Of Ray Draiuiall
TranBmisaion Line Route, Warren t Claibprno Counties, MS, »
por NRC S0011B requost
DrtLE-L F MiBEissippi Pniuer t Light Co BO/D7/17 lp
— 8007320573 "Cultural Resources Survey of Ray Drasuell Tran<«i BciOK Line
Route Warren & riaibarne CountiDK.MS "
D'HEAR.J M , ATKINSON, J P Misainsippi Poyar t. Liflht CD
SO/06/09 3Spp
0007S90332 Foruards comments to amplify previous queitionn r*
instrumuotation b controls rained at O00633 meeting
BCHHENCEH.A Licensing Branch 3 HO/O7/H1 3pp
E NRC Sofety Evaluation liepoi t (SEH). soppla t. corrosponilenc*
Q007070343 Foimaids reBponse to open isBuen for uoo nt flOO70B neetinB
u/Mechanical Engineering Dranch ro draft GER for FBAR
Sections 3 6-3 to Responses to romoinino ton issues will ba
provided on B00707
DALE.L F Mississippi Pouer fc Light- Cn BO/07/03 Shpp
00071-10338 Foriuorda partial transmittal of respunseii to draft SEH for
FSAR Sections 3 6-3 10
DALE.L F Mississippi Pouer & Light Co HO/07/OS 13pp
00(17330301 Significant deFiciency rept re centrifugal charjinfl pump
operation fullouing secondary side high energy line rupturi,
initially reported BOQ&I7 Initdequato min flou may result in
tfagTadeil pump performance UestinghouBe revicuing problem
PARKER, W 0 Pule Pnuer Co BO/07/17 2pp
F Security, medical, omergency {. fire protection plans
8006300379 Forwards Amend 10 to application for OLs for Licenses CPPR-
110 & CPPH-1I9, consisting of revisionn to FBAR, App 9D
BTAMPLEV.N L Mlssinaippi Pouior S. Ligtit CD BO/06/B7 lp
DOCKET SO-4I& GRAND SULF NUCLEAR STATION, UNIT 1
A J^ppl i-catiun/c anslruu tion at ago documents ft correspondence
aoO7I60tlO Foruards correction to fuel load date in BOO514 1 tr
Correct date for Unit 1 is S10031
DALEiL P Mississippi Power t. Light Co 00/06/11 lp
— B007160il7 Corrects 000514 1 tr requestlnp updated d complete schedule
of tafotq mvleu C-orrect fuel load date is FJ10B31
DALE, L F rilsiissipp-i Power I, Light Co BO/05/14 lp
aaO7OlO237 Foruiaros NJ1C reorgani jatton chay t of OPc of Nuclear Reactor
Regulation, effective H0042S Facility activities should be
made through assigned ra.gfc representative Areas of
iSisayrBBine-nt may be discustnd through informal appeal
TEDEECD. R I. Assistant Director far Licensing BO/Ot/13 2pp
BOO701OOa7 Notiftration of G00703 meeting u/utl 1 , DNWL, GE lc Bechtel
Pouier Carp 1 1> OaitherEburg, MD to ravicui Mechanical
Engineffrinfj Branch draft SER
HQU8HTON. T C Licensing Branch 3 BO/06/li 3pp
— B0063003B2 Ameni) 40 to application for OLs for Licenses CPPR-11B &
CPPO-119. consisting of revisions to FSAR App <JH CertlfiiatM
of five encl
STAMPLEY.N L Mississippi Power t. Light Co BO/04/B7 2pp
— H0043OO3B4 Amend 4O to FHAR, providing
lc emnrgency plan
* Mississippi Pouer 5- Light Co QO/Ot/27
aviiian* to fira protietlan plan
09pp
0007010361 forwards umerfleiit (j ti railiol og iccl rniponiB plans for Stiti
of M9,Port Oibson/CIaiborne County. H3, 8, State of LA. in
support of util revinpd omoroifncij plan nubdiittsd on BOOA27
as port of Amend 10 to F3AR
DAL£,L F Misalasippi Power fc Light Co DO/06/37 2pp
8007180273 Forwards roeponse to NRC 8007OS 1 tr re mtimotsd Bvacuatlon
times Estimated evacuation times for tO-mlle emcrgancy
planning lone prepared by Clairborne County, MB & Tsntas
Parrish.UA.encl
DALC.L F Mississippi Pouior S. Light Co BO/07/11 33pp
0 Adjudicatory corrospondenco
BOO7010100 Notification of 800635 meeting w/ulil , GE, Bechtel Power Corp
& Savannah Rwor Lab in (fni thorsburg. MD to discuss FSAR
Section 7. "Ins-trumentation & Control "
HDUBHTOH.T C Licensing uranch 3 90/06/16 2pp
aOD7P300Ol Foruiflrds statement fit polity re requirements to be mat for
current OL appl ications. as derived from NUREO-0660 !> found
In NLJREG-B&94
ElSENHUTiD 0 Division of Licensing 60/06/36 2pp
SOO70 303^5 Forwards stru-ctural drauiinB's supplementing technical info
submitted an BOOS29 t 0606
DALE, L F Mississippi Power «c Light Co 80/06/30 Bpp
— 3007030210 Pacliege of 73 structural ilrauings to be recalled at later
date for microfilming
» Bechtel Corp B0/O6^30 72pp
BOO7310243 Foriijavils Commission BOOS27 memorandum & order containing
dBcisione on UCB 7 GO 902 petition for r»consld<iratlcin of
7B0413 memorandum d order UCB 771101 patition sought action
re fire protection for electrical cables
EIBENHUT.D 0 Pivialon of Licensing SO/06/23 89pp
K Utility Final Safety Analysis Report (FSAR) «< (tmnnda
B00711041S Foruards affidavit of sve for Amend <tO to FBAR.ptv NRC
7B0627 Itr
DALEiL F Mississippi Power & Light Co 00/07/07 Bpp
Q Inspection reports. IE Bulletins & correspondence
B007S40S1B Forwards IE Info Notice 80-20, "Lose of Decay Hoot Removal
Capability at DaviH-DesBe Unit t While in fi»fuBling Mods "
No response required
O'REILLV.J P Region 2. Atlanta. Office of the Director BO/D5/OB,
HPP
263
BO0714O484 Foru*rd* IE Bulletin BO-13. "Crocking in Core Spray
Sparger* " No written response required
O'REILLY.JP Region S, Atlanta. Office of the Director 00/03/12
-0007160866 Responds to NRC B00401 Itr re violation noted in IE Insp
Rept 3O-416/BO-00 Corrective actions all personnel have boon
reinatructed in installation ti insp procedures
MCQAUQHY.J P Mississippi Power fc Light Co BO/05/19 2pp
8007030173 Forward* IE Info Notice 00-23. "Break downs In Co n tarn i nation
Control Program! " No written response required
O'REIU-Y, JP Region 3, Atlanta. Office of the Director BO/OS/SB
-8Q0716OB69 Forwards IE Insp Rept 50-116/80-QB on 900303-06 & notice of
violation
MURPHY. C E Region 3, Atlanta. Reactor Construction t, Engineering
Support Branch 0O/04/01 2pp
BOO 7O 102 SO Forward! IE Info Notice 00-23, "Loss of Suction to Emergency
FaaduDtar Punps " No written response required
Q'REILLY, J P Region 2, Atlanta. Office of the Director 00/05/39
IP
800710O119 Forward I IE Imp Rept 30-416/00-1 1 on 800512-15 No
nonconpl tancv noted
UEUIS, R C Region 2, Atlanta. Reactor Operations Nuclear Support
Branch BO/03/30 2pp
— 0007100124 IE Insp R«pt 30-416/eo-tl on flOObl2-13 No noncomp J tance
noted. Major ar*a» inspected preoperational test program
fc tilting & previous imp findings
KELLOOtP J Hsglon S, Atlanta, Reactor Operations Nuclear Support
Branch WAQNER.A 0 Region 2, Atlanta. Office of the Director
BO/O9/30. 4pp
9007220078 Forward* IE Info Notice 80-26, "Evaluation of Contractor
OA Program. " No written response required
O'REILLY. JP ROB Ion S, Atlanta. Office of the Director BO/06/10
-B00716OS70 Notice of violation from insp on 000303-06
* Region 2, Atlanta, Reactor Construction & Engineering Support
Branch 60/O3/31 2pp
— B007160B73 IE Insp Rept 30-416/BO-OB on 000:103-06 Noncomp liance notr
failure to follow pipe support installation ti map
procedures
ANQ, W P , HILCOX.J D Region 2, Atlanta, Office of the Director
HERDT.A Fl Region 2, Atlanta, fle.ictnr Construction & Engineering
Support Branch BO/03/31 4pp
00073I027O Responds to IE Bulletin BO-OB, "Examination of Containment
Liner Penetration Melds " Evaluation not complete Requests
extension to BOOB 13
DALE.L F Mississippi Power t, Light Co 8O/07/03 lp
B007230433 Forwards response to NBC BQ0634 Itr re Violations noted in
IE Insp SO-416/BO-I2 on B00927-30 Corrective actions
responsible Field engineers have been instructed to obtain
sequential number from respective discipline cut rebar log
MCGAUCHV.J P Mississippi Power fc Light Co 80/O7/2I 3pp
BO0716O278 Forward* IE Info Notice 60-27, "Degradation of Reactor
Coolant Pump Studi " Na specific action or response
roq.uired
O'REILLY, J P RBoion 3, Atlanta, Office of the Director 00/06/11
B007MOZ99 Forward i IE Bulletin 80-14, "Degradation nf BUR 0cram
DliEtiargit Vol Capability." No written response required
O'REILLY, J f>. Rug ion S, Atlanta, Office of the Director 80/06/12
8007330377 Forwards IE Info Notice- SO-2B. "Prompt Reporting of Info in
Accordance M/10CFR3O. 33(el " No written response required
O'REILLY, J P RttOion H, Atlanta, Office of the Director GO/06/ 13
2pp
BXK17020374 For war di IE Circular 60-15, "Loss of Reactor Coolant Pump
Cooling & Natural Circulation Cool down " No written roiponie
raqulrad
0,'REIU,V,J P Reoior, S. Atlanta. Office of the Director BO/06/HO
BQ07310MO Forwards IE In«p Repts 30-416/80-13 & 80-117/80-09 on
8QOAO3-06 No nonconpliance noted
MUBPHYi C E. Region 2, Atlanta, (iooctor Construction b Engineering
Support Branch, BO/06/23 2pp
— BO0731024B IE Xn*p Repts BO-^16/CO-13 ti 30-417/BO-O1? on 800603-06
No nonconpllanc* noted. Major areas inspected radiography,
MBldlna> ultraionic axamlnation b previous insp findings
HERDT, A. R Region S, Atlanta, Reactor Construction & Engineering
Support Branch VANDDOflN, P K , ZAJAC, L D Region 2, AtUnta,
OfficK of the Director 80/06/20 6pp
B0071607B? Forwards IE Circular 80-14, "Radloactlvu Contamination of
Plant Danlneraliiad Uatar 8ijs & Resultant Internal
Contamination of Parsonnel " No written reaponee required
O'fieiLLY, J, P Region B, Atlanta. Office of the Director 90/06/24
BQQ723Q313 Forwards IE Bulletin BO-16, "Potential Mliapplication of
Roianount Inc Moil»li 11S1 d 113H Pressure TranBmitteri
H/Clther A or D Output Codes " Written response required
IE Circular BO-16 al*o encl No written response required
O'REILLY, J P. R*glon 2. Atlanta, Office of the Director BO/06/27
IP-
BO07160B60 Ack r»e»ipt of 800M7 Itr informing NRC of step* taken to
correct violation noted in IE Insp Rept 90-416/80-08
MURPHY.C E. H»oion 2, Atlanta, Reactor Construction b Engineering
Support Branch. 80/07/01 lp,
--6007160862 Revised response to NRC 900401 Itr re violation noted In IE
Insp Rept 90-41 6/BQ-OO Corrective actions. insp program
instituted by constructor tc all nonconfurinances will be
documented.
MCOAUOHY.J.P MlBiisiinpi Power (. Uight Co BO/06/17 7pp
fl Reportable occurrences. LERs (. related correapondEntB
00O70S061S Status deficiency ropt re effects of loss of site power
on rod position indication & neutron monitoring Deficiency
still under investigation Final rcpt will be Forwarded on
B00733
DALE.L F Mississippi Power t, Light Co 8O/05/21 2pp
HQ07170372 Part 31 rept re potentially defective dlosel generator
control panels mfg bij Intl Control i Switchgear Co
Insp underway to determine applicability of deficiency Final
rept uiill be submitted by B0063Q
MCGAUQUY.J P Mississippi Power 6r Light Co 00/09/33 2pp
B007160BB5 Interim deficiency rept rs Incorrect pipe supplied by TX
Plpo Dendlng Heavier wall would not cause avurstreesed
condition Generic implications in other applications under
investigation Final rcpt uiill be submitted by 1300829
HCOAUOHY, J P Mississippi Power !i Light Co BO/OS/ 23 3pp
B00716O643 Second interim deficiDncy rcpt 1PRD-GO/07) re inadequate
Fisher Controls QA program re safety-related controls for
nonpressure retaininu parts !< components QA program
evaluation continues Final rept uiill be submitted by B00636
MCGAUQHV.J P Mississippi Power & Light Co BO/05/33 lp
8007030979 Status Deficiency Rept 4 re OE failure to implement proper
QA program for electrical work Ulll is reviewing
reinsp of art program Final rept will be submitted by 000714
MCOftUQHV.J P Miosisslppl Power b Light Co BO/03/30 3fp
8007020640 Status Deficiency Rept 3 re mod to dragon valve manifolds
Review of application of valve mnnlfolds & sat ety-related
impact still under investigation Final ropt will be
forwarded by (100702
HCOAUHY,J P Mississippi Power i, Light Co 00/06/02 Bpp
B007160611 Interim Joficiency rept re mods to Dragon valva mflnifolds
Review of MCAR-QONS 36 in M Gauge 800306 site insp concluded
that deficiency uias improperly evaluated Final rspt will bo
submitted by B00703
MCOAUQHV-J P HiBslsnipnl Power t< Light Co QO/06/O2 2pp
8006190977 Deficiency rept (PRD-BO/SA) re GE Tijpe SD-12 switches
Questions rationale that safety function of breaker UJOB to
trip on signal from reactor protection ays Re-evaluation
will be conducted & final rept filed by 000710
MCOAUOHY.J P Mississippi Pouer !< Light Co BO/06/13 2pp
00070Q0601 Forwards interim deficiency rept re OE failure to provide
qualified instrumentation in safety-related *.yt
MCOAUGHY-J P Mississippi Pouer i, Light Co 00/06/13 2pp
— 8007050603 Interim deficiency rept re CE failure to provide seitmically
t< environmentally qualified Instruments for use in nuclear
safety-rolaled sys in balance-of-plant pouier generatlan
control complei Corrective action plan eipected by B00711
* Mississippi Pouer (< Light Co 80/06/13 flpp
264
80O7O3O53B Forwards interim deficiency
Model 31D DU trip unit !. Final deflc
re Made] 1152 pressure transmitters
MCQAUGHY.J P Mississippi Power & Light Co
pt <PRD-BQ/11> re Flosemount
ci; rept IPRD-BO/ll)
/Oi/24 2pp
— B00702O539 Final deficiency rept <PRD-eo/ll> re Model 1153 pressure
transmitter u/common mode failure of capacitor at greater
than 173 F or uh-en damping potentiometer is i otated
clockwise GE issued field disposition instruc t ions
* Mississippi Pouiei- t< Light Co BO/06/24 ip
B00717O435 First interim deficiency ropt (PRD-BO/31 > re fnilura of HPGB
switchgoar to comply w/seismic requirements NSSS vondor
evaluation of effects on safety halt not been completed
Final rept lui 1 1 be submitted by B00923
MCQAUGHY.J P Mississippi Power J. Light Co SO/07/11 Ip
BO0722O3BB Status Deficiency Rapt b re failure to establish OA progran
OE has not completed review of insp results tt evaluation of
safety implications Final rapt to be provld*d by 000908
MCQAUQHY.J P Mississippi Power S> Light Co BO/07/lfl 2pp
— 9007020541 Interim rept (PHD-BO/U) re Rosemount Model 910 DU trip/
calibr unit w/corcmon mode failure of essential suite)] that
determines trip output logic GE fcas issued field disposition
instructions for onsite repair
a Mississippi Punier & Light Co SO/06/24 Ip
B007Sa03B9 Status Deficiency Flopt 3 re damage to intermediate metallic
conduit Eitent (• safety Implications remain under
investigation Final rept to be provided no later than
801006
MCQAUQHV.J P Mississippi Power Si Light Co BO/07/13 3»p
BOQ70a063Q Forwards final deficiency rept re defects in diesel
generator control panels
MCeftUGHY, J P Mississippi Pomer h Light Co 90/06/35 Ip
— B00702O432 Final deficiency rept re defects in dlesel generator control
panels irifg by Intl Control E> Suitchgear Co Equipment being
repaired by Mom son-Knuffsen Qf\ activity will be increased
Applicability of 1CCFR21 under- evaluation
* Mississippi Power t, Light Ca SO/06/25 Ip
B00707029B Status Deficiency Rept 3 re inadequate QA program for
nonpressure retaining parts d components Detail of AE
investigation under evaluation Final rept uil] be Forwarded
by B0072B
MCGftUGHY, J P Mississippi Power !v Light Co BO/06/27 2pp
8007110413 Forwards Final deficiency rept re mod to Dragon Valves. Inc.
valve man i folds
MCGAUGHY.^f P Mississippi Power (. Light Co 90/07/03 2pp
— B00711O417 Final deficiency rept re mad to Dragon Valves. Inc. valve
manifolds Failure of valve would not rause malfunction
during emergency operation of standby liquid control sys b
not considered reportable per 10CFR50 5S<e>
* Mississippi Poiuer t> Light Co BO/07/02 2pp
3007110430 Status ffept 1 re procedural violation in cutting rebar Stop
unr* order issued on SQ053O to stop hole drilling operations
For electrical sirpport Craft & field engineering personnel
trained Final rept will be submitted by B00117
MCOAUGHV. J P Mississippi Fouier b Light Co 30/Q7/O2 2pp
B0071SG093 Part 21 rept, supp 1 ementing info previously filed under
1OCFH5O 55lel.ro Rosemount. Inc Model 31 ODD master (< slave
trip units Info should have been included in review of
deficiency repts filed since 1977
HCQrtUQHY, J P Mississippi Power & Light Co BO/O7/02 9pp
B00715009? Part 21 rept, supplement i ng info previously filed under
10CFR90 55(e),re Gnuld-Broum Doveri solid-state trip
ifevices Rept should have been included In review of
deficiencies filed since 1977
MCGftUGHV.J P Mississippi Power t, Light Co 80/07/02 4pp
B0071S010S Part 21 rept, supplementlTig info previously filed under
10CFR50 95(e),re Wastinghouse electrical punelration
assemblies Rept should have been included in review of
tfefit ienciES filed since 1977
HCOAUGHV.J P Mississippi Powor & Light Co BO/07/02 4pp
OO-0717O396 Forwards Final Deficiency Rept PRD-BO/26 re defective OE
SB-12 SiUiitchesi arginallv reported 800513 Rept on
appl icabilsty of 10CFR31 wjll be aubmitteil upon completion
of evaluation
MCQAUQHY, J P Mississippi Pouter & Light Co 30/07/10 Ip
— SO0717O4OO Final Deficiency Rept PRD-BO-2& re flefective GE SD-12
suiitches Identified in IE Circular 79-17 Switches found to
be installed in switchgear supplied by vendor Vendor uill
furnish new switches to correct condition
» HiisiBsippi Pouer I, Light Co QO/07/10 Ip
B00717029O Fnrwai-ds first Interim Reficiencii Rept PRD-aO/33 ra standby
»vc uiafrer sys design deficiency Final rept uill be submitted
bij 801030
MCQAUGHV.J P Mississippi Power & Light Co BO/07/11 tp
— 8007170394 First Interim Deficiency (lept PRD-90/32 rn standby svc uater
sg-> design deficiency Debris picked up by standby svc uatcr
ti HPCS svc water pumps transferred Into sys No provision
Bints For filtering Sys design uill be analyzed
« Mississippi Power & Light Co. BO/07/11 Ip
B007290510 Status Rept S to deficiency rapt ri design nomograph!
related to ITT General Controls hydramotor eltc trohijdraulic
actuators Evaluation by NSSS vendor inconpletv Fin«l ropt
should bo forwarded l>u BOO 9 19
MCGAUGHY.J P MiBsiflBippi POUIBT t- Light Co 80/07/31 2pp
— 8007230520 Responds to IE Bulletin 80-07i "Mgilrflmotor Actuator
Daficiencios " Two NH90 serins hi(dramotor actuator* in use.
Evaluation indicates that no mods rcqulr*d
DALE.L F Mississippi Power ft Light Co, 80/06/lo 3pp
B0072909fi6 Potential deticiencu rept re nonconf ormancoi fl»o(iat*d u/
calibr svc 5 provided by Computer Sciences Corp
Nonconformancos noted during, utll Apr 1900 audit of callbr
facility Final rept will be submittod bu BOOB22
MCQAUGHY.J P Mississippi Power b Lioht Co 60/07/82 Ip
6007390655 Provides status of potentially ripartable deficiencu ra
fractured valve body on jacketwater thermootatic valva of
standby diesel generator Magnetic particle elimination
performed Heportabili ty hilll be determined by GOlOtO
MCQAUQHY.J P Mississippi Power !< Light Co BO/07/H3 2pp
B007390666 Forwards Stotus Hopt 2 of potentially reportabls- daficlancu
re malfunctions of Limltorque valve oporators CauBed by
ocessive threading of stem protectors final rept by 001103
MCGAUGHY.J p Mississippi Power b Light Co GO/Q//33 Spp
BOO/290^71 Forwards status of potentially reportabla daficl*ncu ra
Incorrect translation of meld requirements from design
drawings to Field sketches Investigation continuing Final
rept mill be submitted by B00917
MCOAUGHV, J P Mlssisulppi Power tt Light Co BO/07/53 2pn
B007290714 Provides status of potentially reportable doficitncy re
loss of offsito power accident ti effects on rod position
gys & neutron monitoring tys Deficiency still undor
investigation Final rept will be provided by BO 1330
MCOAUQHY.J P Missiosippi Power !< Light Co 00/07/23 2pp
B007S90791 Deficiency Status Rapt 1 re damaged eta tor coil fnr itandbu
diesel generator Deficiency investigation incomplete
Reportabili ty determination fc final rapt uill be submitted
by 801217
MCGAUOHY.J P HiBiissinpi Pouiar t Light Co 60/07/23 Ip
DOCKET 30-417 GRAND GULF NUCLEAR STATION, UNIT 2
A Application/construction utage documents & corraipondenc'a
B007160610 Forwards correction to fuel load data In B003I4 Itr
Correct date for Unit 1 is B10B31
DALE.L F Mississippi Poiucr & Light Co BO/06/11 Ip
— 0007160617 Corroctn 000314 Itr requesting updated I* compute ichlduli
of safety review Corroct fuel load date is 010B31
DALE,L F Mississippi Power b Light Co SO/OS/ 1 4 Ip
B007010237 Foruords NRC roorganiiotlon chart of Dfc of Nueloar R»»etor-
Regulation. effectivo 0004H0 Facility activities should be
made through assigned mgt repreflentntl ve Areas of
disagreement may lie discussed through informal appeal
TEDESCO.R L Asnistant Director for Licensing 00/OA/13 2pp
0007010D87 Notification of 80070B meeting iD/vtiti BNWL, OE t, Bactitel
Power Corp in OaithersburH, MD to review Mechanical
Engineering Branch draft SER
HOUQHTQN. T C Licensing Branch 3 BO/06/16 3pp
DOCKETED ITEMS
265
BQQ7Q1O10O Notification of 300629 meeting u/uti 1. G6, Bechtel Poiuer Corp
Ii Savannah River Lab in Qai thorsburgi MD to discuss FSAR
Suction 7. "Instrumentation (. Cnntrol "
HOUOHTQN.T C Licensing Branch 3 BO/06/16 2pp
BOQ723OGQ1 Forwards statement of policy re requirements to be met for
torrent OL applications, as derived from NUREQ-O6AO t< found
In NUREO-0&94
EIDENHUT, D 0 Division of Licensing 00/06/36 2pp
BQO703Q243 Forward 6 structural drawings supp 1 einenting technical info
•Ubnlttad on BOO 927 b 0606
DALE, L F Mississippi Power t> Light Co BO/Oi/3O Spp
— BOO7O3024B Package of 72 structural drawings to lie recalled at later
dot* for micraf timing
* Bectitel Corp SQ/06/30 73pp
8007Z4O2O7 Summary of BOO623 meetino ui/app 1 icant in Oai theraburg, HD re
instrumentation & control sys questions & response &
dttcunlon of review schedule
HOUOHTON, T C Licensing Branch 3 BO/07/03 7pp
8007880*94 Forwards response to 10 remaining open Issues in draft BER
Info covers seismic subsystem analy aits, accep tonce criteria
for steady state piping vibration (< praservice & in service
pump t valve tasting
DALE. L F Mississippi Pouer (. Light Co BO/07/QB 13pp
BO07Z2096<7 Forwards "Cultural Reeourcos Survey of flay Brasuiell
Transmission Line FloutB, Warren fc Claiborne Counties, MS. "
par NRC 600118 request
DALE, L F Mississippi Pouer b Light Co BO/O7/17 Ip
— BOO 7220 3 73 "Cultural Resources Survey of Ray Drasuell Transmission Line
Route Warren b C la i borne Counties, MS "
a'HEAR.J U , ATKINBON.J P Mississippi Power fc Light Co
eo/06/09 aapp
6007290322 Forwards comments to amplify previous questions rs
instrumentation Si controls raised at B00623 meeting
SCtWENCER.A Licensing Drench 3 BO/O7/31 3pp
E NRC Safety Evaluation Report (EER). supple & correspondence
BQ0707024S Forwards response to open issues for use at H00709 meeting
M/Mnchanical Engineering Branch re draft SEfi tor FSAR
Sections 3 6-3 10 Responses to remaining len issues will be
provided on 000707
DALE.L F Mississippi Power & Light Co BO/07/OS 36pp
B007140388 Forwards partial transmittal of responses to draft SER for
FSAR Sections 3 6-3 10
DALE.L F Mississippi Poiuer I, Light Co 80/07/00 13pp
F Security, medical, emergency & fire protection plans
— 8006300384 Amend 40 to FSAR, pi uvi rting revisions to fire protection plan
& emergency plan
fl Mi5EiG5ippi Poupr !< Light Co HO/O6/27 B5pp
B0071I0412 Forwards affidavit of svr for Amend 10 to FSAR. per NflC
7B0627 Itr
DALE.L F Mississippi Pouter t, Light CH BO/07/07 2pp
Inspection reports, IE Bulletin? !i r orroBpondenc
BO0724O21B Foruard* IE Info Utitice BO-20, "Loss of Decay Heat Removal
Capability at DdUi S-DBBSO Unit 1 Wh i 1 e in Refueling Mode "
No refiponse required
0'REILLV,JP Region 2. rttlantap Office of the DireLtor 30/09/Oa
BPP
B00714O'1(34 Foruiardij IE Bulletin 00-13, 'Trorking in Core Spraij
Spargers " No urittoii response required
O'FIEILLY.J P Rcginn 3. Atlanta, Office of the Director BO/OS/12
IP
B007O1025O Foruarde 1C Info Notice 80-23. "Loas of Suction to Emergency
Faadujater Pumps " No uritton respnnso required
D'REILLY.J P Region 2. Atlanta. Office of the Director 8O/05/29
IP
B00733007B Toriuards IE Info flntice SD-P6. "Evaluation of Contractor
QA Programs " No untten rpsponso rpquirod
O'REILLY. J P Region B, Atlanta, Office of tilt Director BO/06/10
2pp
B00716O27B ForuarrlB IE Info Notice- HO-27, "Degradation of Reactor
Coolant Pump Studs " No specific action or response
required
D'REILLY.J P Rcginn 3, Atlanta. Office of the Director BO/Ofa/11
IP
8007140399 Forwards IE Bulletin 00-lfl, "Degradation of BUit Scram
Discharge Vol Capability " No uiritten response required
O'REILLY. J P Region 2, Atlanta, Office of the Director DO/O6/12
H007250377 Foruards IE Info Notice 20-33. "Prompt Reporting of Info in
AccordantD W/10LFR90 35<u) " No written response required
D'REILLV.J P Region 2, Atlanta, Office of the Directoi 00/06/13
Spp
B007020374 Foruards IE Circular £10-15, "Loss of Reactor Coolant Pump
Cooling J" Natural Circulation Cuoldouin " Nu written response
requirej
D'REILLV-J P Region 2, Atlantu, Office of the Director BO/O6/30
B007310240 Forwards IE Insp Ropts 50-11 ii/80-13 t< 50-417/00-09 On
B00603-0ft No noncnmpl lance noted
MURPHV.C C Region 3, Atlanta, fteactor Construction & Engineering
Support Branch SO/O6/23 3pp
BO070 10361 Forwards omergency & radiological response plans for St*to
of MB, Port Qibson/CIalborne County, MB, t, State of LAi in
support of util rflvlsed omergencij plan submitted on B00627
as part of Amend 40 to FSAR
DALE.L F Mississippi Power t. Light Co 80/06/27 3pp
8007100393 Forwards response to NRC B00702 1 tr re estimated evacuation
tines Estimnled evacuation times for 10-mile nmergency
planning lone prepared bu, Clairborne County, M9 tt Tensas
Parrlsh. LA, ancl
DALE.L-T Mississippi Poiuer t. Light Co 80/07/11 33pp
0 Ad judicature correspondence
B007310243 Toviunrds Commission B00327 memorandum fc order containing
(Incisions on DCS 7H0302 petition for reconsideration of
7804 13 memorandum t< order UCS 771104 petition sought action
re fire protection for electrical cables
EI8ENHUT.D 0 Dlvinion of Licensing BO/OA/3B S9pp
K, Utility Final Safety Annlusis llopart (TSAR) t, amends
3006300373 Forwards Amend 40 to application for OLs for Licenses CPPR-
11B ft CPPO-H9, consisting of rovisinns to raAR.App 9D
STAMPLEYiN L Mississippi Power t. Light Co 80/06/27 lp
— BOO7310215 IE Inap Repts SO-4U,/QO-U k 90— H7/RO-09 on 000603-06
No noncomp 1 innce noted Major areas Inspected radiography,
uiplding, ill trasonic oieminrttion t. previous m«p findings
HEUDT, A R Region P. Atlnnta, Reattov Construction d EnginBerinfl
Support Branch vANDnOHN, P K , ZAJAC, L D Region 2, Atlanta,
Office of the Director BO/Ob/20 ftpp
6007160737 ToruardB IE Circular E30-H, "Radioactive Contamination of
Plant Derainurallied Water iiys *< Rosult.int Interniil
Contamination oh Personnel " No urittnn ipsponso required
O'REILLY'J P Rcflion 2, Atlanta, Office of the Director BO/06/S4
IP
0007330213 Foriuards 1C Bulletin HO-16, "Potential Misapplication of
Rooomount Inc Models 1191 f. 1 1 15 Pressure TranEfni ttors
W/Elthor rt or D Output Codes " Written rciponoc lequirud
IE Circular SQ-l/j al'io onrl No written roiponsc re[\uirod
O'REILLY. J P Region 3. Atlant.i, Offiri' of the Director BO/Ot/27
IP
800721027Q Jlosiionds to IE Bulletin BO-OB. "Eiammation of Containment
Llnar Poiiutr Jliun Wolds " r>.aliiation nut complete Requests
Bitensinn to BOOB1S
DALE.L F Mis&ieuippi Pouer I. Light Cn 30/07/03 lp
— BQ063Q03f)2 Aftiflnd 40 to application for OLs far Licenses CPPR-11B S<
CPPR-119. consisting op revioionr. to TSAR App 90 Certificate
of Sve «ncl,
BTAMPLEY.N L Mississippi Power t< Light Co 80/06/27 2pp
266
S fieptn-tabln ocrurr-pnc
related cnrrospondo
B007O20613 !,Ului defi
an rnd position ind i
sttll under investig
000733
DALE.L F ttissiscippi Power
ncy rept re effects of loss of site power
ion t. neutron monitoring Deficiency
on Final rrpt mill ho forwarded on
Light r0 BO/OS/ai 2pp
H007170593 Pai t 31 rent re potentially defective diosel generator
can triil panels rafg b-ij intl Control t. Suitchgear Co
Inap UTideru.-ii) to dut ermine app 1 1 call 1 1 1 lij op deficiency Final
rant uill be submitted by FlOOdSS
KCCAUGHV.J P Mississippi Pouer t- Light Co BO/05/23 2pp
H0071&O593 Interim deFiclentij rept ro incorrect pipe supplied by TX
Pipe tending Hoavtor mall mould not cause overstreased
cnniditinr* Genet ic impllcaUmiB in other applications undor
investigation Final rupt mill bo oubraitted by 600859
MCQAUQHY, J I1 Mississippi Power fc Light Co 60/05/23 2pp
BertmdJ intarim deficiency rept <PRD-BO/07) re inadequate
Fisher Control'-. GA program IB aaf sty-related controls for
nnnprflssure retaining parts !c componnnts OA program
evaluation continues Final r-ept will tin submitted by 500626
MCQAUGW.J P NlSGigsippi Power (. Light On (30/05/23 Ip
60070305/9 Status Deficiency Rept 4 re OE Failure to implement proper
QA program for t'lertrical ujurfc Util is reviewing
reins)) of Ort program Final rept mill 60 submitted by B00714
KCOAUQHY, J P Mississippi Power tt Light Cn QO/OS/30 2pp
El 0070 «! 06 4 Q Statiiu Deficiency Kept 2 rn mod to dragon valve manifolds
Revlou of flpp 1 itiition of v.jlvB m.ml folds !< safety-related
impnct still under 1 nvestigri tion Final rept mill he
forwarded itj (100702
KCGAUHV, J P Mississippi Pinner !- Light Co BO/O/i/02 2pp
B007140611 Intel im rtoPiciBncy i ept re mods to Dragon valvu manifolds
Revlow nf MCAH-GOMO 2A in M Oouge not>306 site insp concludaiJ
that duP Ic i pncij uas Irnppopcily ewnluatod Final rept uiill bo
submlttod by 000702
MCGrtUQIIV.J I1 Mississippi F'OUPI !. Lioht Co B0/0h/0a 2pp
0007C130A01 FOTtiards Interim deficiency root re OE Foilure to provide
qualified ins trumentat Inn In safety-related r>ya
HCBrtUGH/.J P Mississippi F'ouier !i Light Co nO/Ob/13 2pp
— S0070aO603 IntoiJm deficiency rept re OE failure to provide soiamlcally
fe environmental ly qualifird InstrumentB for use in nuclear
saf o tij-rff Intcd sys in lial.ince~nf-p Innt pouior generation
control nimplea Torrcctive actlnn pl.in cipocteil bij B00711
" HlBsisuippi Puuier & Light Co HO/06/13 4pp
00070205^11 ForuionlB intorlm dcficiuncy rept <PRI)-BO/!11 re Flosemount
Undo) S10 DU trip unit (. Pinfll dofifienru rept (PRD-QO/lli
re Modo-l 1192 proiiiiirn traiiBini ttors
MCGfiUGHViJ P MlifiisDippl F'onier !i Light Co QO/06/24 2pp
— BQ07110417 Final deficiency rept re mod tn Dragon Valves, Inci vulva
manifolds Failure of valve mould not cause malfunction
during emergency operation of standby liquitl control sgi &
not considered repnrtable per IQCFflSO 3"He>
. Mi5t,lB9lppi Power f. Light Co BO/07/O2 app
S007U0430 Status Rept 1 re procedural violation in cutting rahar Stop
uark order issued on FJ00530 to stop hole drilling operations
for electrical support Craft d field engineering pernonntl
trained Final rept uill be Bubmitted by 800117
MCOAUOHV.J P rlisGisEippi Pouer t, Light Co QO/O7/O2 Spp
Q007150093 Part 21 rep t, supp lement inn info previously Pilod undar
1QCFRSO 95(e),re Rosemount, Inc Model S10DU master t slave
trip units Info should have been included In review of
dBficiency reptfi filed since 1977
MCOftUQHY,J P Missisalppi Poycr J, Light <'o 00/O7/02 9pp
B0071S0099 Part 21 rep t, suppl ement ing info previously Piled under
10CFR50 55(B).re Gould-Drown Dovori Eolld-stfltu trip
devices Kept should have been included in revieu op
doficiBncios filed sinca 1977
HCOAUGHViJ P MlSEissippi Pnuor (. Light Co SO/07/O3 4pp
8007190103 Part 21 rept. supp I emc-nting info previously filed under
10CFD90 53(e).re Uestinghoune electrical penetration
assemblies Rept should have been included in review of
deficiencies filed fiinco 1977
HCOAUOHViJ P Mississippi Power & Light Co BO/07/02 4pp
g00717037i Forwards Final Deficiency Rept PRD-80/26 re defoctiVB OE
BD-12 switches, orginally reported B00312 Dept On
applicability of IOCFR21 will be submitted upon completion
of evaluation
MCGAUaHY.J P Mississippi PownT & Liglit Co 1)0/07/10 Ip
-- BQ07170400 Final Deficiency Rept PRI1-BO-2A re defective GE SB-12
auiitchos identified in IE Circular 79-17 Switches Pound to
be installed in •jwitcbgear supplied by vendor vendor will
furnish new switches tu correct condition
» Missi!,3ippi Powor t. Light Co BO/O7/10 Ip
fl(107170P90 ForuiartJB first Interim Deficiency Rept PRD-BO/32 I-B standby
ivc water BIJI. design dePicioncy Final rept will be submitted
hy BO I 020
riCQAUQHY.J p MinaiSBipp! Power S. Light Cn HO/07/11 Ip
— Q007170BV4 First Interim Deficiency Rept PRD-QO/32 re standby sve uot«r
sys design deficiency Debris picked up by standby svc water
d HPC9 svc water pumpn transforred into ays No provision
ttiists for filtering Eg a design uill bo annlgied
« Mississippi Puuor tt Light Co 80/07/11 Ip
B00717Ofl3S First interim dffiriency ropt CPJlD-aQ/31) re failure of HPCB
switchgear to comply ui/BOiamit requiromontB NSS5 vendor
evaluation of effects on E.ifotij liaa not been completed
Final rept will be submitted bij 000923
MCOAUGHV.J P niasisgippl Pouiar t Lioht Co 80/Q7/11 Ip
— QOO70HO53'? Finnl dvFtr IBIICIJ ropt IPRD-flO/ll) re Model 1132 pressure
tran&miHur M/ common modp failure of capacitor at greater
than 1 /S T or wtien damplnsj potentiometer is rotatoil
clotkwiao OK i-isiiua field •diapOEilion instructions
* Mississippi Pouei Ft Light Cn 30/06/24 Ip
— H007OyO'541 Interim rept (PRD-80/111 10 Rosemourit Model 310 DU trip/
cnltbr unit u/cnmmon mods failure of essential awitch thai,
doteimiiiBS trip nubput loijlc GE lia? issued field disposition
instruct! ims fm on&ite repair
" Miisinalppi Pnuiei R Lign' Co RO/Od/24 IP
D007O20A30 Forwards Pinnl deficiency ropt re defects in J
gnneroLor coi>trul panels
P MisiiEsippi P<iuipr ;• Light Co SO/06/23
— BOO7030ti32 rm.-j] deFitiency rept re defects in iJieael senerator control
panels mfg try lull Control 'i Byitchoear Co Equipment being
r-upalred by Mrrrl sun-Hnurlinjn OA nctivltij will be Increased
icabl 1 1 ty uf 10CFIU) under evaluation
Mississippi Pnuor J. Light Cn OO/Ofe/23 Ip
B007220:iE)Q Status Deficiency Rept i re failure to establish QA pfogram
OE has not completed review of Inop results & ovnluation of
safety implications Final rept to be provided by EQ09Q9,
MCGAUGHV.J P Mississippi Powoi- t, Light Co QO/Q7/14 3pp
B0072203B9 Status Deficioncy Rept a re domaije to intermediate metallic
conduit Eitent Ii safety implicjlt-ians remain under
investigation Final rept to be provided no later than
Q01006
MCOAUOHY.J P MiaBiDsippi I'ouor Si Light Co BO/07/tO 3pp
H007330510 Status Rept 3 to riePiitency rept re design nomu(|raphs
related to ITT General Controla hydramotor oloc trohydrculic
attuatnrs Evaluation by NSS9 vendor incomplete, Final rept
should be forwarded by 000915
MCOAUQHY.J P Mississippi Power !< Light Co BO/07/21 Spp
— B00725Q320 Responds to IE Bulletin BO -09, "Hydi-araotor Actuator
Def iiioncies " Two NH90 series hydramotor uctuators in use
Evaluation Indicates that no mods required
DALE.L F Mississippi Power t. Ltght Co BO/Oi/li Bpp
fl 007070591) EJbal^iin Dnficiency Wept T rp inadequate (1A projran far
nonpressurB cetdining parta A components Detail of AE
investigation under evaluation Final rupt uill he Forwarded
hij 8007HD
MCOAWQHV.J P Mi*Bi5*,iiipl Power !< Light Co 00/06/27 Hop
B 007380 5 6i Potential deficiency rept re nonconf ormancea aisnciated
calibr svcs provided by Computer Sciences Corp
NnnconPormnncBB noted during utll Apr 1980 audit of calibr
facility Final rept will bo submitted by BOOB22,
MCOAttOHY.J P MioBiBsippi Power t, Light Co BO/07/22 Ip
8QQ7IJ04i3 Forwards final deficiency r(>pt PO mod to Dragon Valves, Inc,
valv-e irraniPc-lds
P Hi5',is-.ippi Power J< Light Co BO/07/02 Hpp
DOCKETED ITEMS
267
Provides status of potentially repoi-table deficiency re
*-"actured valve body an jflc fcetuater thermo a tall c valve of
tnndbg diesel generator Magnetic partitle eiaminatton
. Reportabili ty mill be determined bij B010IQ
J P Mifisiss-lppi POUJBT !. Light Co BO/07/33 2pp
HO0701O354 Responds to IE Bulletin SO-09, "Hydramotor Actuator
Deficiencies ' No ITT Opneral Controls Model AM-9O '< NH-90
hydramotor actuators fcave been purchased for Uif at utll
COUNSIL.U 0 Northeast Nuclear Energy Co Kutm of Northeast
Utilities) BO/Q&/16 2pp
Forwards Status Kept S of potentially reportable deficiency
malfunctions of Li.mi torque valve operators Caused by
threading of stem protectors Final rept by 601103
P Mississippi PDUJHT E, Light Co 80/07/33 Hop
2pp
Provides status of potentially reportable deficiency r
*i of offslte poujer accident Et Defects en rod position
™*j» & neutron monitoring sijs Deficiency still under
*vwi»tigatlan Final rept mill be provided by G0123O
HOQAUCHY. 0 P Mississippi Power f, tight Co BO/O7/23 Bpp
Forwards status of potentially repOT-table deficien
T»« orrect translation of weld requirements from design
<t*-awlngs to field sketches Investigation continuing Final
v» wilt be submitted by 800717
, J P Mississippi Power 8, Light Co BOX 07/23
B00703O491 Forwards IE Circular GO-15, "Loss of Realtor Cnolant Pump
Cooling tr Natural Circulation Con 111 own " No written response
required
QRIER. Q H Region 1. Phi ladelphia. nfFice of the Direct or
BO/O6/2O lp
B0071AO714 Forwards IE Clrculai BO-34. "Radioactive Contamination of
Plant Demineraljieil Water Sys !, Resultant Intel-rial
Contamination of Personnel " No written response required
GFUEH, B H Region 1. Philadelphia. Office of the IHrector
BO/01,/34 If
B007S1O207 Forwards IE Info Notice BO-31, "Lou Level Raduaste Burial
Criteria " No written response required
GRIEH, 0 H Region 1. Philadelphia. Office of the Director
aOVOti/33 lp
^07290791 Deficiency Status Rept I re damaged stater coil far standby
*)£•••! generator Deficiency investigation incomplete
R« partabi lity determination b final rept mill be submitted
bu 801217
KCOAUOHV.J P Mississippi Pouer S, Light Co HO/O7/23 IP
6007330146 Forwards IE Bulletin HO-16, "Potential Misapplication of
Rosemount Inc Models 1 151 t< 115-3 Pressuve Transmitters
W/Either A or D Output Codes " Written roaponae required
IE Circular 80-16 also ent 1 Ho yntten response required
OHIER.D H Region 1. Philadelphia. Office of the Director
Epp
30-423 WILLBTONE NUCLEAR POWEfl STATION, UNIT 3
Appl lCMtimn/con«trtJc tian stage documents !< corpe&pa
Forusriii statement of policy re requirenents to be met for
currant Ol- oppl ications, aa derived from NUFIEO-0660 d Pound;
*n NUfiEO-0694.
EISEHHUT-D 0 Division of Licensing BO/ 06/36 Spp
Adjudlcatorg c-oi-rxpondencB
OO7310Z43 Foruiard* Commission BO 0537 memorandum b ardor containing
dvcliioni on UCS 7B05OS petition For roconsid oration of
VQO413 mimnrannum & order UCB 771104 petition sought action
r-0 fire protection for electrical cables
EISeNHUT, DO, Division of Licensing BO/Ot/2S 09pp
Finincial Information
O-OVJ.3O622 Foruards 1900 cash flow estimates for CT Light & Pouer Coi
Hartford Electric Light Co b Mffsttrn HA Electric Co Cash
float are adequate to 'meet potential premium requirement*
for 1973 amends to Price-rtnderson Act
O'CONNOn.LA Nnrthenst Utilifcien BO/O7/O3, 3pp
Inspection reports. IE Bulletins b correspondence
OO7OIO31S Foriuards IE Info Notice B0-23i "Loss of Suction to Emergency
F"**du»ter Pump* " Mo writ tan reapnnse required
OfllERiD H Reginn 1. Philadelphia, Office of the Director
EtO/03/29 lp
IQO717O919 Foruiardv response to IE Bulletin CO-OB, "Vacuum Condition
RMmulting In Damage to Chemical Vol Control Bu« (CVCB)
Holdup Tanks " Provido-s list oF 5-ys in facility containing
tanks that can be valved to contain p-rimarij ays uater
COUNSIL.H G North east Nuclear Enerfiy Co (subs of Northeast
Utilities) 00/06/09 7pp
60072 1O S3 3 Foruards IE I nap Rept 50-423/60-03 on 900423 No
noncomp llance noted
CAflLSONrR T He jinn Ii Philadelphia, Fleactor Con-struc t ion b
Engineering support Branch HO/Q7/I3 2pp
— B007210545 IE Inan Rept 50-1S3/60-O3 nn 300423 No none ompl iance notod
Major areas inspected containment [< reactor area, control
bldgj turbine bldg tt other svc areas Ntuly assigned inspector
introduced
CERNE, ft C , FEIL.R (legion 1, Philadelphia. Office of the
Director MCCftUQHY, RW Flpginn 1. Philadelphia, Reactor
Construction It Engiriecrino Support Branch BO/Ofi/lO 3pp
Q Reportoble occurrences, LERs !- relafcoil correspondence
BQ0721O457 Ac k receipt of B006J4 deficiency rept r* possible
Inadequacy of charging pumps following secondary sys high
energi| line rupturo
CARLSON, R T Rejion K Ph i Jodc-lph ia. Ruactor Construe item fc
Engineering Support Dranch 00/4)7/01 lp
— B00721O320 Interim deficiency rept confirralng BOOSIS telcon
Meetinghouse tentrifugal chiirginj pumps may not deliver m!n
flou at valve act paint pressure Action mill be delayed
until (-tasting, house analysis completed
CQUNSIL.w Q Northeast Hut 1 car Energy Co (subs of Northeast
Utilities) BQ/0&/14 lp
DOCKET 30-134 ALVIN H VOOTLE NUCLEAft PLANT, UNIT 1
A fifp 1 1 c atlon/cuiiBtru'C tion stage documents & coireipondenc e
H00723QOOI Fortuards statement of poltEij re requirements to be met for
current DL appl icatlons. .15 derived from NUREG-0660 fc found
in NUREG-0694
EISENHUT, D 0 Division nP licensing BO/Ob/56 2p p
Security* medical, emergency ti fire protection plans
KJO7210390 Fo-ruiards IE Info Notice SO-26, "Evaluation of Contractor
OA Pragrams- " hln written reaponse required
ORIEH.B H Region 1. Philadelphia, Office off the BiPector
Forwards IE Info Notice BQ-37, "Degradation of Reactor
Coolant Pump StudG " Ho specific action or response
•r-*qulnd
OftlER.B H, Region 1, Philadelphia' Office of the Director
0O/06/11 lp
FoTiiiards IE Info Notice BO-28. "Prompt Reporting of Info In
ce U/1QCFRSO 55<el " No urjttin response required,
, B H Region 1, Ph i lad olph ia. Office of the Directop,
0O/06/1.3 lp
BOO7290771 Foruards evacuation tine estimates per NF)f 791226 t,
requests
£HREN3PEROER, H Oenrgia Power Cn SO/07/33 lp
— B007290777 lEvotuatlon time e-slimntes for facilities HapB end
» Oeorgla Power Co 00/07/33 Bpp
0 Arfjud»cfltory correspondenrif
H00731O343 ^-oruiards CommiBElon BO 0132 7 mamnr,intfum f, order containing
decisions on UCS 790302 petition for rec onsiiieration of
730413 memorandum (. nrder UCS 77IIC1! petition sougtit action
re fire protection far electrical cat-tea
E1BEHHUT.D 0 Division of Licensing 80/06/28 Biff
268
H General correspondence
9007030344 Requests that NRC tevise cnn t'spoiidence distribution,
changing address** to UE Ehi enspei <i?r
EHRENSPERGEFi. U Oeorgia Pniue- Co HO/06/30 Ip
—BfXVl 10136 IE U>sp Hepti •JO-IPI/RO-O? !, ')()- 1^1/00- (1 ' on H00414-I6
Nontnmpl lanci" noted fnlluip to cv,ilu*re mnistturo check teat
IBBlllts
LENAHAfJ.J J Dogion 2, Atlanta. Office of thi) Director
CANLWN.L E Region 3, Atlanta, Henttor Construction & ETng InBorl
SuppOit nranch HO/09/OI ')pp
-,. IE Bullet
B00724O313 Forwards IE Info Nature SO-30, "Lose of Decay Heat Removal
Capability rtt Davis-Hesse Unit 1 While in Refueling Mode "
No response required
O'REILLY.J » RKyion 2, Atlanta. Office of the Director BO/01/OB
2pp
B00721046B Forward* IE Circular 80-13. "Orid Strap Damage in
Uostl nghouse Fuel Assemblies " No writ ten response required
O'HEILLV. J P Begion 3. Atlanta. Office of the Director BO/O5/20
IP
BOQ7QWB2D Forwards IE Info Nntue 80-^3. "Lofis of Suction to Emergency
Feeduiater Pumps " No written response required
O'UEILLV.J P Segion 2. Atlanta. Office of the Director 30/03/29
IP
8007230072 Forward* IE Info Nutiiu BO-26, "Evaluation of Contractor
QA Programs " No written response required
O'HEILLY.J P Region 2, Atlanta, Office of tho Director 00/06/1O
2pp
8007160274 Forwards IE Info Notice HD~27, "Desrfldatian of Reactor
Coolant Pump Studs " No specific action or response
requi red
Q'REILLV.J P Region 2. Atlanta. Office of tho Director 80/06/11
IP
B007250375 Forwards It Info Notice BO-SB, "Prompt Reporting at Info in
Accordance H/10CFH5O "iSlel " Nn written response required
O'REILLV.J P Reniori 2, Atlanta. Office of the Direttor BO/06/13
2pp
Q007020319 Responds to IE Bulletin BO-09, "Hi|dromotor Actuator
Deficiencies " Utll does nnt use ITT QonEral Controls AH9O
series fii|dramotor actuators for tiny safety-related sys or
component!.
BUTTON.!) Georgia Puuier Cn HO/06/li 3pp
600727010^ Forwards IE Insp Hepta 10-131,'HO-09 f/ 30-4H9/BO-09 on
900523 Sc 23 No none nmp 1 lanre notod
HUHPHY,C E Region 3. AtKinta. Reactor Construction !< CnginBering
Support Branch BO/06/16 3pf,
— B007B904I4 IE Insp Repts SO-flBA/HO-O' Si liO~']S5/BO-O<} on 600332 S, 33 Na
noTic ompl lancu noted Major area inspected licensee Identified
item re erosion nf Categoty I backfill
CQNLON, r E Region 2. Atlanta, Reactor Construction & Engineering
Support Branch HARRIS. J H Region 2. Atlanta. Office o* the
Director CiO/06/13 <!pp
BOD702O45O Forwards IE firculai BO-15. "I oss of Reactor Coolant Pump
Cooling & Natural Clrmlati nn Conldolun " No written response
reqtrire'd
D'HEJILV.J P Region a. Atlanta. Opflcc of the Director 80/06/30
a007||D315 Ack rnceipt of B00601! Itr mtorming NOC of steps taken to
correct /lulation noted in IE Insp llepts 50-434/00-07 !<
50-125/80-07
MUBPHV.C E lloginn J. fihlant.i. Reactor Construe ti on tt EnginOBring
Support Branch 80/06/24 Ip
--90071 1032] Respun'lt, to NflC flOO-iOl Itr re violation noted in IE Insp
Ropta 10-424/HO (17 '( IiO-4c!5/f)0-07 Corrective actions record's
from Kept llJ'>'-Apr I^SO uiare rovluuieo1 'i Liirrelation curves
were ijcneratpd (. e/alunted
DI/TTONpD Qenrjia Power ^o FJO/(W()!> 2pp
--8007110537 Forward' IE Insp Septa SO"134/H()-07 }, 30-433/BO-07 on
HOQ414-1& r, notice of violation
MUflPHY.r E Reyion 3. Atlanta. Rejctor Conotruction I* Engineering
Support BrrtJich 9O/O5/0] 3pp
— S00711O53I Notice of violation from tnsp on 000414-16
* Region H. Atlanta. Office of the Director BO/05/01 Ip
80071/0119 Foviunrds 1C Cucul.ir £10-14. "fldii 1 oar. 1 1 vn Contamination aP
Plcint l)eminer,,l iiccl Wnter Uys f, Rosullant Internal
iauir«d
QO/06/Z4
ci ,, <
Contamination of Personnel " No written i esjinnne lefl'Jt''"!
0'nEll.UV.J P Region 2, Atlanta. Office nf tlie Diroctnr
SOO73P0275 Responds tn IE Bulletin 00-08 Flupd head purmtvation weld*
installed (. HinminBd accnrdinq tn A!!ME roqulrcmeritn
BUTTON. D Oeurgia Power To SO/06/^. 3pp
0007330219 Fnrwsrrfs IE Bulletin BO-1A. "F'utential Mi oapn 1 1 citlon of
Roaemnunt Inc Mndelb 1151 Si 1153 Pt eesui e Tranoml ttera
W/Either A or D Output Code« " Written rooponso roquimd
IE f.lrcular (](]-!& also oi'cl No lun'ttfn ruaponse requlrnd
O'REILLY. J P Keg i on 3. Atlanta. Uffim of tho Director
Ip
HO/ 06/87
DOCKET 90-123 rtLVIN W VOOTl E NUCLEAff PLANT, UNIT a
A App 1 K3t ion/curio true t ion stage document! d corroupuniliincB
0007^30001 Foriiiiirds itntBmi'nt of polity ru roi[u IromitntB tin !>• wet for
current OL app 1 icatlons, no derivctf from NURGO-OA40 «< Pound
in NUREO-06V4
EIBENHUT.D (J Divioion Of LiiunBino UO/Oft/HA .'p|>
F Sucority. medical. umarflenLij (. f\rn pmtottlon plan*
B007290771 Foruni'd'j evacuution timp oitimoteo per NRC /VlfiitA 4 000703
renuea to
EHRENIPrfiQt-.R.U Goorgi,i Pnuat Co !10/n;/i':i Ip
-- B007390777 Evacuation tirno D n 1 1 ras t i?i fur Cii'iKtiun Mapn anrl
* Oeorgia F'dwrr Co QO/0//,'Jn Hfip
0 Ad judi catorg rnrrospumloru 0
6007310343 Forwardu Uimmiusion H003.'/ maniorafKlum t. uriioi ciint«lnln|!
decisionB on UCF1 .'BOiiOS petition fur mniiiB idol ntl un of
7Q0413 memo ran dum d nnlur 1KB //II04 potltinri nought nitlon
ru fire protoi. tiori fnr nlsctmat rnblim
EIBENHUT, 0 0 Division of l.i i unn ing (W/OA/JB [Wpn
It Oennral coi respond one o
B0070Q0314 fleriuwsts th.it NRC revlnu r orpnnpnndtmce il I stvluut inn.
changing addresseo tn WE Chrenupergnr '
EHRENGPEnOER, W Uniii-oia Pilmor i i, l]»/i)/i/.ll) Ip
Q Inspection repurt*. IC Hul lot inn f. LurroBponcleni. •
BDO/31021D rnru.irrts IL Info Notice FID i'Q, "I u»n of nurnij IP«at ftumovfll
Cupabllity at Oiivm-nnsKu Unit t Wh il D In itufucl Ing Miida "
No rsBponse i uquired
O'flEILLV.JP Tiuqion f, Atlanta Offii u up the Dlrurtor ItO/OB/QO
3pp
UOO/31046B Fnrwarile It Ciccitliir fJO rl. "tirtil 'Hra\> Itainaya In
HHotinolioosB Fuel Antumblion " Hn Kirlttnn i Hipunno roqulrert
O'HEHLViJ P Ranlnn 2, Atlanta. OCFU» r)f tl>o Dtrni tni< HO/03/2H
IP
0007010230 Foruarila IE Info flatico dO-J'J, "I nun nf Liuttlun tn tn.rB»neu
Fecriiuater Pumpa " No uirlttcn runnonou leiimrod
O'REIILV.J P Region 2, Atlnnt.i. flfflru »f thn l)irert(ii> 00/09/39
IP
0007330073 Toruardii IK Info Nolne 8O-.J4, "Gv.il ir«t i on of Oonlractor
QA ProgrotnB " No lui'itton i-espunao ruiiuirer)
O'REILLY. Jf Degiun S, Ablnntn, Ufl'ire of the r>lrt>Ltor HO/OiS/IO
8007160271 Foruiards IF- Info Notitu QO-i'7, "Dooradation of Fieactor
Coolant Pump Btudi, " No Hpocifir artioii or reflponao
required
n'HEILLY. JP Hugion P. Atlanta, Office of the Director 00/Oi/ll
Ip
8007250373 Forwards IE Into Notice SO -20, "Prompt deporting of Info In
Accordant^ W/IOCFR30 55(e-t " Nn urittsn response required
O'REILLY. J P Ron'on S. Atlanta. Office of the Director flO/Ofa/13
Bpp
BOO 70202 10 desponds to IE Bulletin 30-09, "Mijdromotoir Actuator
Oft iel»ncin« " Util does nut use ITT Betieral Controls AHfO
lories hydrarootor actuators for any safety-related 3ya or
components
DUTTON'D Georgia Poiuer Co BD/Od/Ii 3pp
DOCKET STN-3Q-137 FLOATING NUCLfrAfi PLANT
A rtppl i tatum/cons true tion itagp documents d cor respond en c e
ubmits summary of BCOblD meeting For U Butler briefii
Comni s« i oner (SiJinfikij an alternate; mettiad; Far controlling
hydrogen in itc condenser c ont.i 1 nmrnt Serves oe notification
For paitios to floating nuclear plant proceeding
AUSTIN, J H Property ", Supply nranth BO/O6/26 lp
0007290407 Forwards IE Insp Ftupts 30-124VBO-09 J. SG-4B5/BO-Q9 on
BOO 322 & S3 No noncomp 1 iance noted
HURPHYi C £ Rug ion 3, Atlanta, Rene tor- Construction & Engineering
Support Branch SO/OA/14 2pp
—0007 8^ 041 •» IE Imp Rapt* 5Q-4;34/GO-O9 & 30-435/00-09 nn SOOS23 fc 23 No
noncompJiance noted Major area Inspected litBnsoe identified
i turn re erosion of C a tog or y I backfill
CDNLOMi T E Rug Ion 2, Atlantn. Henctor Conn true V i on J. Enginpur i ng
Support Branch HARftlH. J n Region a, Atlanta, Office of the
Director BO/06/ 13 2pp
80070X0490 Forward* IE Circular BQ-15, "Los& of Reactor Coolant Pump
Cooling t> Natural Circulation Coo Id cum " Ma written response
r«quir»d
Q'REILLYi J P llnaion 2, Atlanta, Office of the Director EO/O6/2O
aOO723OO01 FormarJs statement of policy re i c-iui rement 5 tn be met
current OL appl ic i tion&, a^ derived from NUJi EG-C^O d Pound
in NUHEO-0694
E1BEMHUT.D C Pivision of LiceniUti) aD/O6/2i Sup
B007aiO3[75
3(,At3, "OPS
to Post-Till NRC
orusro ,, *5pon5es o os-
Hequi rpmentsj " Ppvlsion 1 Rppt repi events Vital m.ijoritg
of nuiu info ret|uirud to agpjjot-t iiBu.tnu- of mg t 1 ttunse
Request!, meeting ki/NRT at c,irtip-,t. pussittlc
HAQA.F' D Dffihorp Poiut-r Rijstumb (subs of
Corp ) BO/C7/I5 3pp
— 3007210404 "UPS Respunses to F*O5t-TMI NRC Re(imr*iient9 " Revisi
» OPtfshore Punier Systems dubs of Ueitlnghou^e Electric Cor|
36A7J F)l OtJ/07/31
Q Ad jud i catorij c ur
S007110515 Ac I receipt of BO0605 Itr informing NfiC of stona tahtn to
ourroct violation notad in IE Inap Reptb 30-424/80-07 &
MWPHV.C E Roglon 3p Atlanta. Reactor Construction (< Engineering
Support Br*Tlch BO/06/34 lp
£K)0731O?43 rormarda Comraisulon B(109?7 memo r and um 5i order containlr
tfocisioris on WfS 7F)Ob02 potituin ffrr roc (inside rat ion of
7FO413 momoraniluin R ordei UCS 771 \Q1 petithon sought action
re fire protectinn for electrical cable*
EISENHIH.D Q &ivision of Licensing OO/Oft/25 Blfp
~eO07I10921 Rmppnds to NflC 0003O1 Itr r« violation nntcd in IE Inap
Roptl 5O-434/BO-07 b 30-425/BO-07 wnrrcctiue actions records '
from Bfft 1979-Apr 17BO mere ravloiued d <: orrelati n-n curves
bltr* g«ncrateil b evaluated
DUTTON. 3) Oeoroia Power- Co HO/Oi/09 3pp
—9007110537 FoTdlorda ie In&p Rant* UO-424/OO-07 fc 30-425/60-07 on
B00414-1A b notice nF violation
MUHPHVi C E RaQlon Si Atlanta, Reactor Coimtruc t ( nil !. Engineering
Support Branch 80/05/01 3pp
— B007110531 Notica of vinlutioti Pram incp on H00414-1&
» Rogion S. Atlanta, Office- of Iho Director 00/03X01 lp
— 800711033& IE Inflp Repto SO-424/[10-O7 !i 30-425/90-07 on BOQ411-16
MoncnopHsnco noted failure to nvaliratfl iDDisttire cJii'cfc teat
raiulti
LENAHAN.J J Roolon B, Atlanta, CJffU* of the Dlrflctor
CANLONi L E Raglan 2, Atlnnta. Reactor f (inn trut t Ion ii Enq i-neer 1 ng
Support Branch BO/O3/O] Spp
8007170113 Forwarrin IE Circular 00-14, "Radioactive Contamination of
Plant D»min»Y8Jiied Water Bys It Resultant Internal
ContsmlfiaLion of PorsonnHl " No written re*ponse requifBd
O'REILLV.J P R»glt>n E, Atlanta, flffico of the Director BO/Ot/24.
aOO«aoa7fl Hcspondn to IE Bulletin BQ-OB Flltpd houd pnnctrstlnn walda
installed b etamlned according to ASHE requirvin^nta
DUTTON. D Ssoroia Power Co BO/OA/PA 3pp
8007330^49 Forwards IE Bulletin BO-1A, "Pu tenbial Ml-sappUca ti on of
Rosanount Inc Model* tJ3l tt 1IS3 Pressure Tranpmitt»rB
H/Elthaf A or D Output Coden " Written response required
IE Circular QO-li alau end No urittan rBBponse required
O'REILLV-J P Rogion S. Atlanta- Qfftco of the Director BO/Qb/37
H Oenaral c nrrespontfenee
B007150013 Acli receipt "? «nd 8U0407 Itr to President Cartel- rn
omployrnBTit opportunities nffereil bij aCFshoro flojtino
nuclear ptiint projfct Docistons on tiirnraorcial projects arc
fflsdo bij private Etc ttir, ui/NRC app-rdval
HrtTbDN.J H President tit US «, Erotutive [IfFices HO/03/li >•
fl00711010i, rttk n?c"ipt oF EKKHO/ 1 ti to Whitt; House Final decision
license Floating nuclear plants mill not bo made until
review is comp, li-te , ACflS mak&B fniiiing re safely (. A'SLB
HuthoriJts lEiujntf uf lic^nsu
DFNTONi H H Office uf Nuclear Rpactor Ucoulatlon. Dlrortor
BO/06/ 19 Spp
000714010-9 neq.uo(!t', rnplij tu Cl i)roun BOO407 Itr uipres-ain-g
floating nuclegr pnuicr plant project
SEAL, M II Prosldunt uf US t, Eiecutivp QfPiCBB BO/03X21
1 1 on repni'+u- IE Bulletin", f. cor
rip-onbence
SOO7240(IB1 Foruiarrte It: InFo NotUc HP-^O, "i o^s of Dec.iy Huat floma
Capability nt Davis Deaiu Unit 1 Uhile in ncfuoljiig Mode "
Mo r-cupDnae r«q.utreil
O'RCILLV.J P Floglrvn P, AHanba, OFfifti of tlio Dir*rtor 80/05
lp
BOO72104I4 FuruHvds IP Tiriulflr HO- IT "Uric) Strap Dnm.ige in
M»stlngliuuso Fnt-1 As!iprablier. " Mu iiiri-ttui) responto ri'qulrpd
O'fiEILLV. .) P Ketjlon P, Atlanta. (If fire of the Dlpettor BO/05
FniuJciTds Ifc InPu Notice Bf>-^l. "Loss nf Suction to EWP<-
Fooduater- Pumpe " No written rcapon-ie reriuiir-Pi!
O'RblLLY.J P Hi-ginn J. Atlanta. Office of t)iB Director BO/03
DOCKET 50-433 UC-SANTA BARDrtRA HEBEAnCH HEACTOR
Q Inip«ction reports, IE Dull e tins & cot'TBBpondent e
9007320026 forwards It Info Notice 80-26, "rvjluation of C
(IA Prugra^iB " Ho written rusp-ntiao reqLireif
O'nElLLt.J lf Fluqinn '<>. Atlant.i, OfFite fif the Dire[tOT
QOO71Q0243 Foruarde IE Circular BO-M. "Rdd Inactive Contaminot 1 "n of
Plant Domineral lied Water Sijt Ei Resultant internal
Contamination of Personnol " Mo written renponsB ronuiroJ
ENOELKEN-R II Heflion 5, 9nn Franci-sco, llffice of the Dir-ectur
80/06/34 lp
9007160315 Foruianti IE Info Nutice HO -P7, ' Degriidnt ion of naactoi-
Coolant fump Btui)& ' Ho specif IL action or rP5pon5-c
required
D'PEILLY-vf F Ftoqion 3. At 1, in to, OFFira OF the Dnertor BO/Qti,
B007250'3e<? Foruards IE Info Nutlrt i)0-^U, "Prompt Reporting II F Inf<
Accordance W/lOCFftSO 5-Slel " Nu uirjtttn reapcinse roqinr'Bo'
O'REILLY, J P Region S, Mlantn, Offica oF the Director BO/06)
270
DOCKETED ITEMS
8007030330 Forwards IE Cirrular 80-15. "Unss of Reactor Coolant Pump
Cooling 6 Natural Circulation Cooirioun " No written responsfl
T^nutreO
a'REILLY.J P Region S, Atlanta. Office of tde Director BO/06/2
B0071602B7 Forwards IE Info Notice BO-27, "Degradation of Reactor
Coolant Pump Studs " Ho specific action or response
required
0'REILi.Y.JP Region 2, Atlanta, Office of the Director 00/06/11
IP
8007170134 Fpruiarils IE Circular BO-14. "Radioactive Contamination of
Plant Demineral iiod Wader Syt !. Resultant Internal
Contamination af Personnel " No written response required
O'REILLV.J P Region S. Atlanta. Office of the Director 60/06/24
If
3007230199 Forwards IE Bulletin BO-16. "Potential Misapplication nf
Rnsemnunt Enc Models 115) fc 1132 Pressure Transmitters
H/Elther A or D Output Curies " Written response required
IE Circular BO- It also end No written response required
Q'SEILLY.J P Region 3, Atlanta. Office of the Director BO/OA/27
IP
DOCKET 30-43B DELLEFONTE NUC1 EAf? PLANT. UNIT 1
A Application/construction stage documents i> correspondence
B0072303B4 Forwards IE Info Notice GO-SB, "Prompt Reporting Of Info in
Accordance U/10CFR30 55(e> " ND written response required
O'REILLV.J P Region Si Atlanta. Office at the Director. 80/06/13,
0007290341 Forwards IE Insp ReptH SO-43B/HO-OB fc 30-439/80-08 on
800527-30 No noncomp 1 iance noted
MURPHY. C E Region 3, Atlanta, Reactor Construction fc Engineering
Support Branch BQ/Ofi/16 2pp
-- BOQ7290361 IE Insp Rept» 30-43H/HO-OB & 30-439/BO-OB on BOOS27-30.Ho
noncompliance noted Major areas Inspected containment
pre*trnsBing, receiving b ntorag« inep & IE Bulletins 79-SB t,
BO-03
CANTRELL.F S Region 2> Atlanta. Reactor Construction fc
Engineering Support Branch WRIOHT, R M Region B> Atlanta, Office*
of the Director 60/06/16 8pp
BOO7010426 Submits info re INRVCO, Inc tendon installation operations
related O.A/QC at tivl ties, in response to NRC BCQ424 I tr
Training attivities sa tisfactorl ly completed, as confirmed in
8006 17 tele on Uor* mill be resumed on buttnnheading
MILL9.L M Tennessee Valley Authority BO/06/33 Ip
0007020391 Forward* IE Circular SO- 19, "Los* of Reattor Conlant Punp
Cooling & Natural Circulation £aoldoun " No written r»tpon»*
required
D'REILLY.J P Region S. Atlanta, Office of th* Director. 8O/04/M.
Ip
H007230001 FoTuardE stateim-ent of policy re requirements to be met for
•current OL appllcotionB, as donved From NUREQ-OfifiO !. found
in NU(IEO~06'?fl
EISENHUT.D 0 Division of Licensing B0/06/2i 2pp
BOO7 1 aoB<7-i Notification of 6007H3-S4 meeting ui/utll t< AHL In Detheida,
MD bo revieu electrical, instrumentation !< control drawings
for confnrmancp u/seporatlon, redundancy t, single failure
cri berid
BOUBNIA.A Licensing Branch 1 80/07/07 4pp
8O07I30346 Advises that Facility tfiesel draulngs have been transmitted
under separate cover to A Bournia.per NflC B00701 request
M1LLS-L M Tenneaoee ValJey Authority BO/07/OB Ip
(IOO715039] Advises that Facility dlesel generator drawing* are being
transmitted under separate cover to B Halvorson. per NRC
request
MILL8.L M Tennessee Valley Authority SO/07/OB Ip
BO07aOOOHO Foriuarits roquffB-t for addl info re OA program
TEDESCO.R L Assistant Dimeter for Licensino BO/07/23 3pp
0 Adjudicatory corrcsponde'nce
BOO 73 1024 3 Forwards Commission 800927 memorandum fc order containing
rftciiioni on UCB 7 BO 302 petition For reconsideration of
700413 Memorandum fc order UCS 771104 petition sought action
r« fire protection for electrical cables
, D 0 Division of Llconsing BO/06/S5 B9pp
fl. In f fiction t'uports. IE Bulletins J- corrospanilencE
9007740089 ForUJrUa IE Info Notice SO-SO, "Luna of Decay Heat Removal
Capability at Davis-DBsse Unit 1 Mlille in Refueling Mode "
No p*»pon»* required
O'HEILLViJ.P RoH(pn 3, Atlanta. Office of the Director 80/05/OB
Spp
8007020192 Forward! IE InPo Notice 8Q-33, "Dreakdouns In Contamination
Control ProaromB " No written response required
QJfierLUV,J P, Region a, Atlanta, Office of the Director 80/05/2B
B007S104BS Forward* TE Circular 80-13, "Op Id Strap Damage in
Meitlngnouie Fuel fitttmblltf " No writtrn rt»ponsi required
0'REILLV,J P Region 2- Atlanta, Offle* of th* Director BO/05/2B
BOQ701GSSS Forward* IE Info Ndtit* HO-?3- "l-0*« of auction to Emergency
Foedwater Pump* " Mo urlttsn rc»ponti(i required
O'HEILLVfJ P Rejlon a, Atlanta, ntfift of thf Director BO/OB/29
IP
E007S2O029 Forwards IE Info Notice BO-ZA, "Evaluation of Contractor
OA Proarflins, " No written resonnsB roqutred
O'REILLY, J P Region S, Atlanta. Clffiro of the Director 00/06/10
3pp
BD07170D70 Forwards IE Circular BO-14, "Radioactive Cantuninatlon a*
Plant Diminerallied Mater BUS b Resultant Internal
Contamination of Personnel, " No written response required.
O'REILLV.J P, Region S, Atlanta. Office af the Dirsctor BO/04 /24,
IP
B007230233 Forwards IE Bulletin BO-lt, "Potential Misapplication of
Ro»emount Inc Hodels 1131 & 1152 Pressure Transmitter*
U/Elther A or D Output Cod 05 " Written reiponse required.
IE Circular 90- li also end, No written response required.
D'REILLV,JP Region 2- Atlanta, Office or the Director 80/06/27
8007100203 Respond* to NRC 800606 1 tr re violations noted in IE In»p
Reptt M-43B/SO-07-02, 50-439/BO-O7-02. 30-430/80-07-01 h
00-439/80-07-01 Corrective actions uielder ti rod room
atttndanti retrained to welding tnatl control requirement!
MILLS, LM, Tennessee Valley Authority BO/06/30, 4pp.
0007100169 Forward! revision to B00602 retponsa to Infraction notad In
IE Imp Rept 50-43B/BO-06 OC Investigation Rept 3619 wae
written to disposition Improperly routed cable*. Harh release
was written to eliminate: conduit mlsroutlng
MILLS, L (1 Tennessee Volleg Authority BO/D7/01, 3pp.
8007210036 Forwards rvipons* to IE Bulletin BO-OB r*-exaMlna.tion af
containment liner penetration welds Penetrations at
Bequoyah,Matt* Dar b BeIl»Fonte contain fitted head design.
Deilgn for Yellow Creed not yet completed
H1LLS,L N, Tennessee Valley Authority BO/07/08 9pp.
8 fieportable occurrences, LERt tt related corraspondence
8007300167 Fourth Interim deficiency rept re upper stressing haad for
rock anchor Uttl & poat-tensloning contractor metallurgical
investigations are Incomplete Record OF matl furnished by
contractor will appear In Final rept
01LL.ELAND, J E Tennessee Valley Authority 76/04/12, 2pp.
0007100233 Forwards Interim deficiency rapt re const OA audit,
MILLS, L M Tennessee Valley Authority 80/06/30 Ip
— S007100B36 Interim deficiency rept re failure to document r»^ulr«d
insps of all permanent mechanical equipment since Jut 177V
Util reviewing available insp records & rainspectlng
equipment to determine possible damage
« Tennessee Valloy Authority BO/06/30 Ip
B007I00209 Forwards second Interim deficiency rept re const <M audit
deficiency
MILLB.L M Tennessee ValUy Authority BO/07/02. Ip,
— B007100S13 Second interim deficiency rept re const OA audit deficiency.
Welders t, foremen retrained on S00522 Plan is being
developed to ensure training for every certified welder li
foreman
* Tennessee Valley Authority BO/07/02, Ip
DOCKETED ITEMS
271
6007160690 Forwards final deficiency rapt re
installation procedures
MILLS, L M Tennessee Valley Authority BO/07/07
iolation of Inryco field
lp
B00721O48B Forwards IE Circular 80-13, "Grid Strap Damage in
UBS ting house Fuel Assemblies " No written response required
O'REIULY.J P Region 3, Atlanta, Office of bhn Director 80/O5/SS
-80071&O636 Final deficiency rept re violation of Inryca field
installation procedural Inryco OC documentation was signed
by Individual* other than those performing mark Iftil issued
• tap work order far all quality related Uiork on B00423
* Tennessee Valley Authority (30/07/07 2pp
BOD701Q225 Foruiarfls IE Info Notice BO-23, "Loss oP Suction to Emergency
Feediiiater Pumps " No written response required
O'REILLY.J P Region 2, Atlanta. Office of the Director 8Q/OS/29
lp
80Q7 140424 Eighth Interim deficiency ropt TV failure of expansion
anchors to past qualification tests Final resolution to NCR
871 mat provided in 790720 rept NCR B9B will be resolved u/
final resolution to IE Bulletin 79-O2 Nett rept by B10114
MILLS, L. M Tennessee Valley Authority BO/07/OB lp
BQ072HO&AO BupplS 600630 response to deficiency noted in IE Insp
Repts 3O-43a/flO-07 & 3O-439/BO-07 Util Is investigating
tine between discovery of potential concern t. issuance
of rept
MILLS, L H Tennessee Valley Authority BO/07/22 2pp
0007290789 Fourth Interim deficiency rept re seismic response for
primary branch lines Found not conservative for all pipe
Biie* under l/S at BBE loadings per Revisions 1 h a of DtW
Spec 1391 Revision 3 to verify response spectra
MILLS, L M Tennessee Valley Authority BO/07/33 3pp
800729074? TMlrd Interim deficiency rept re tmo uelds found lacking
sufficient internal purge, during rework operations of
chemical addition h boron recovery sys Caused by inadequate
oalnt, Pr'ogram being developed to check purging protect
MILLS, L,M Tenneseee Valley Authority BO/07/23 2pp
DOCKET 50-439 BELLEFONTE NUCLEAR PLANT, UNIT a
A. Application/construction stage documents !< correspondence
BOQ722Q029 Forwards IE Info Notice 80-26, '•Evaluation Df Contractor
QA Programs " No written response required
O'REILLV.J P Region 3, Atlanta, Office of the Director BO/O6/1O
3pp
BOQ71602B7 Forwards IE Info Notice BO-27, "Degradation of Reactor
Coolant Pump Studs " No specific actidti or response
required
O'REILLY.J P Region 3. Atlanta, Office of the Director BO/O6/11
IP
B0072503B4 Forwards IE Info Notice BO-SB. "Prompt Reporting of Info in
Accordance W/10CFR90 53<e) " No written response required
O'neiLLY.J P Region 2, Atlanta, Office of the Divactor BO/06/13
3pp
B007290344 Forward! IE Insp Hepts 5O-43B/BO-OB !< 50-439/80-OH an
B00527-30 No noncnmp 1 lance noted
MURPHY, C E Region 2, Atlanta, Reactor Construction (< Enninsering
Support Branch 80/06/14 2pp
— 8007270361 IE Insp Repta 50-13B/BO-OB (c 50-439/90-OB on 600327-30 No
noncumpl iancc noted hajor areas inspected containment
prestresslng, receiving t, atnrage insp J. IE Bulletins 79-HB fe
BO-03
CANTRELL.F B Region 2. Atlanta, Reactor Construction (.
Engineering Support Branch UH1GHT. R H Region 3. Atlanta, Office
of the Director (10/06/16 Bpp
B007230QO1 ^Forwards it stamen t of policy re requirements to be met far
current OL «ppl icatloni, as derived from NUREO-O660 t. found
In NUREO-0694
EIBENHUT.D 0 Divlaion of Licensing BO/06/3A 2pp
B00718O296 Notification of 900723-24 meetino ui/util !. ANL In Dethesda,
ND to review electrlcali inotrumentatlon ti control drawings
for conforMancv u/»paration, redundancy I< single failure
criteria
BDURNIA.A, Llcanilng Branch 1 BO/O7/07 4pp
800715034& Adviies that facility diesel drauings have been transmitted
under separate cover to A Bournla, per NRC 800701 request
MILLS, L H Tennessee Valley Authority BO/07/OB tp
OOO713OS31 Advise* that facility dlesel genarator drauiings are being
trantmltted under separate cover to 9 Halveroon, per NRC
request
MILLS, L. M, Tenneteee Valley Authority BO/07/Oa lp
B007300OBO Forwards request for addl info re QA program
TEDE8CO, R,L Assistant Director for Licensing 00/07/33
0 Adjudiiatory correspondence
3pp
8007310243 Forwards Commission BQOS27 memorandum 1< order containing
decisions on UCB 780 SOS petition For reconsideration of
790413 mnoranduii & order UCS 771104 petition sought action
re firo protection For electrical cables
EI9ENHUT,D,0. Division of Licennlna, BO/Oi/25 B9pp,
0. Advisory Committee on Reactor Safeguards reports & torrHapondBnco
770S140021 Foruird* portion of BellePonte Bubcoramitte meeting
tranneript queitloning whether operator could diagnose
accidont fc asies* cor* status,
BENDGR>N ACRS - Advisory Committee on Reactor Safeguards
79/04/09. 13pp
0. Inspection reports, IE Bulletlna t< correspondence
BO0724OO89 Forwards IE Info Notice BO-20, "LoBB of Decay Heot Removal
Capability at Davis-Be»»e Unit 1 While in Refueling Mode "
No response r*quir»d
O'nEILLV.J.P Region a, Atlanta, Office of the Director BO/05/OB
B007020391 Forwards IE Circular 90-13, "toss of Reactor Coolant Pump
Cooling & Natural Circulation Cooldoun " No urltten response
required
O'REILLY.J P Region 2, Atlanta, Office of the Director BO/O6/20
lp
B007170070 Forwards IE Circular BO-14, "Radioactive Contamination of
Plant DeminoraUied Water Qys !i Resultant Internal
Contamination of Personnel " No written response required
O'REILLV.J P Region 2, Atlanta, Office of the Director BO/O6/24
IP
BQ07B3.0293 Forwards IE Bulletin BO-I6, "Potential Misapplication of
ROBUmount Inc Models 1151 !< 1153 Pressure Transmitters
H/Elther A or D Output Codes " Written response required
IE Circular BO-16 also end No urlcten response required
O'REILLY.J P Region 2, Atlanta, Office of the Director BO/O6/27
IP
6007100203 Responds to NRC 800606 Itr re violations noted In IE Insp
Repts 30-438/80-07-03, HO-439/BO--07-02, 90-430/BO-07-O1 b
30-437/BO-Q7-01 Corrective nctlona uiclder !< rod room
attendants retrained to melding matl control requirements
MILLB.L M Tennessee Valley Authority SO/0 fa/ 30 4pp
3 Reportable occurr oncc-s. LERs tt related correspondence
B007300I67 Fourth Interim deficiency rept re upper stressing head for
rock anchor Util h poat-tensioning contractor metallurgical
Investigations are incomplete Record of tnatl furnish oil gy
contractor ui 1 1 appear In final rept
GILLELAND.J E Tennessee Valley Authority 7V01/12 2pp
B007100333 Foruiards interim deficiency rept re const OA audit
MILLS- L M TennBsaue Valley Authority GO /O fa/ 30 lp
— 8007100H36 Interim deficiency rept TO failure to document required
Insps of all permanent mechanical equipment since Jul I 979
Util reviewing available insp records (< retnspecting
equipment to determine possible damage
» Tennessee Valley Authority 80/06/30 lp
B007100207 Forwards second interim deficiency Topi re const DA audit
deficiency
MILLSiL M Tennessee Valley Authority BO/0 7/0? lp
— B007100213 Second Interim deficiency rupt re const QA audit deficiency
Welders i foremen retrained nn 800532 Plan is being
developed to ensure training for every certified ueliler &
foreman
* Tennessee Valley Authority BQ/O7/02 lp
272
BOO71AO650 Form.-iTds final J iff it I ency rept re violation c,f Inryco field
installation procedures
MILLS. LM Tc-nnessee Valley Authority QO/07/07 ]p
— 8007160456. Fin.il deficiency ropt re violation of Inryctt field
installation procedures Inryco (1C documentation uas aigned
bij individuals othpr than those per form ing work Util issued
atop uork order for all quality related work on 800423
» Tennessee valley Authority BO/O7/07 2pp
BOQ7]&Q424 Eighth interim deficiency root re failure of cipansinn
anthors to pass qualification tests Tina! resolution to NCR
B7I was provided in 79072G rept NCR 699 mill be resolved w/
Final resolution to IE Bulletin 79-02 Neit I apt bu B101I4
MILLS. L M Tennessee Valley Authority 90/07/06 !p
BQO73aO660 Supple BO0630 response to deficiency noted in IE Imp
Rept-s 50-43S/BO-07 & 50-439/90-07 Utll 15 inves t iga t ins
time between discovery of potential concern !e issuance
up r"pt
MILLS. L. M Tennessee Valley Authority BO/07/22 2pp
9007390725 Fourth interim deficiency rept re seismic response fnr
primary branch lines Found not conservative fur all pipe
siiss under 1/2 of SSE loadings per Revisions 1 ?. 2 of DIM
Spec 1391 Revision 3 to verify response spectra
MILLS, L H Tennessee Valley Authority BO/07/23 2pp
80O7H90749 Third interim deficiency rept re tuo uelds found lacking
sufficient internal purge, dur ing rework operations of
chemical addition & boron recovery sys Caused bij Inadequate
main* Program being developed to check purging process
HILLSj-L H Tennessee Valley Authority SO/07/23 Spp
DOCKET BO-410 PERftY NUCLEAR POWER PLANT, UNIT 1
A Application/construction stage documents t< correspondence
fl007O2Q214 Forwards NfiC Ofc of Nuclear Reactor Regulation B00426
reoroani lation, chart Necessary period of transition made
ui/min disruption to ongoing activities
TEDESCO.H L Assistant Director for Licensing BO/06/13 2pp
B007230001 Forwards statement of policy ro requirements to be met for
current DL app 1 icst 1 nna, »s derivcil from NU!! EG -0660 I< found
->
EISENHUT.D Q Division of Licensing 00/06/26 2pp
Submits list of changes ulil plans to make re environ
monitoring program during const Rationale for changes one 1
DAVIDSDN.D R Cleveland Electric Illuminating Co BO/07/07 5pp
G rtd juJicatory correspondent, p
BOQ7310343 Faruaros t-ommiasian 800527 mnmorandum t< order containing
dec is tons (in DCS 7B0303 petition for reconsi deration of
7B0413 memorandum !i order UCB 771104 petition sought action
re fire protect inn for electrical cables
EISENHUT.D 0 Division of Licensing BO/06/23 S9pp
M General carre'spondejice
9007330392 Forwards NFJC 197^ Annual Rapt In response to 900621 request
re progress of nuclear pouter !> regulations on pouicr plants
Unit I mill start operation in 19B4 t. Unit 2 in 19SB Cover
iheet onlij encl
DENTOM. H R Off! to nf Nut 1 ear- lleactnr Regulation, Director
BO/OA/27 app
OOD7230109 Forwards, under separatfl cover, ace eptance revieui copy of OL
appl ication, consisting of application t< environ rept for
placement in Perry, DM Publ i c I iBrary Utll uiil 1 submit TBAR
on 800904 for review
, J 1- Division of Rules and Records 60/07/07 Ip
— B007140265 Order granting eitension until B00709. for Clovoland Flocti-
Illuminating to to file amend til tariff y/FERC as required
by 800513 order
DCNTDMiH FI Office of Nuclear Reactor Regulation. Director
BO/06/11 2pp
B007I40Q/9 Conditional request for hearing re Commission QOO513 orilnr
re mod of transmission tariff Urgei; mod of order to bring
consistency tu/FERC tariffs in Opinion 84 or institution of
hearing Util protest before FGRC t> Ceitiflcate of Svc encl
GDLDBER8.H , WAONCR, T E Cleveland, OH GOLDBERG. R Ooldbern,
Fiuldman !. Hjelmfolt GQ/O7/OV 14pp
Q Inspection reports, IE Bulletins fc correspondoni e
0007H05S1 Forwards IE Bulletin 00-13, "Cracking in Cora Opr«y
Spargers " No written response required
KEPPLEH.J 0 Region 3, Chicago, Office of the Director 80/05/18
IP
8007090134 Forwards IE Insp Repts 50-1 40/30-07 !< 30-441/BO-07 on
H00903-07 t. notice of violation
FIDRELLIiO Hogion 3. Chicago, floactor Construction t, Eng iti»erino
Support Branch BO/O3/2I 2pp
— B007090156 Motice of violation from insp on B00505-07
n Region 3. Chicago, Office of the Director BO/05/19 2pp
— BOD70TO199 IE Insp Repts 30-440/BO-07 t. 30-441 /BO-07 on 000SO9-07
Nancompliance noted inadequate Issuance of documents,
inadequate quality records, Inadequate instrut tions & failure
to follow procedures for anil placement
HAVES, D W Region 3, Chicago, fieactor Construction & EnflineBrlng
Support Dranch GALLAQHEn,!: J , LANDSMAN, R L Region 3, Chicago,
Office of the Director GO/OS/)1? 6pp
0007090176 Foiuiards IE Inap Repts 30-110/80-06 t< 30-441/HO-06 on
000421-34 t, notice of violation
FIORELLliO Region 3, Chicago, Ruactor Construction !< Enginooring
Support Dranch 80/05/21 2pp
— B00709017B Notice of violation From inep on H00131-34
* Region 3, Chicaao, Office of the Director HO/03/16 ip
— B007090179 IE Insp Rapts 50-140/BO-06 & 50-1H/BO-O6 on B00121-24
Noncompl ianco notoi) failure to identify eomponnnt to bo
covered by QA program ti inadequate indoctrination b
training of personnel
HAVE9, D W Regioh 3, Chicago, Reactor Construction h Enoineoring
Support Drancli HUQHEB. J , LAIJDSMAN. H D {legion 3. Chicaflo.
Office of the Director BO/03/16 ftpp
B0070I0139 Forwards IE Info Notice (30-23, "Lous of Suction to Emergency
Feuduater Pumps " No written response required
KEPPLCR.J S Region 3, Chicago, Office of tha Director 00/03/B9
H007160729 Forwards IE Insp Repts 50-440/flO-OO fc 30-44I/BO-OS On
000506-09 & notice of violation
F10RELLI.G Region 3, Chicago, Reactor Construction t, Engineering
Support Dranch BO/ 06/04 2|)p
—0007160734 Notice of violation From insp on BOOSOA-09
» Region 3. Chicago, Office of the Director 00/06/03 Ip
--B007160741 IE Insp Repts 50-440/80-00 t< 30-441 /SO-QB on 000506-09
Noncompliance noted failure to speilfy appropriate codes or
stds in purchase order
LIZE.E H Region 3, Chicago. Office of the Director
DAN1ELBON, D H Region 3, Chicago, Reactor Construction tt
Engineering Support Branch BO/OA/OB 6pp
B007220178 Forwards 1C Info Notice BO-P6, "Evaluation of Contractor
QA Programs " No written rcDponne required
KEPPLER,»I,0 Region 3, (.hicogo, Offlco of the Director BO/06/1O
M Antitrust c or respond once
6007140231 Forwards Director of Nuclear Reactor Regulation order
further mod J fying BOOS 13 order ui/respect to licenses ft
permits for facilities
BALTZMAN.J Utility Finance Branch SO/06/11 Ip
(30071^0256 Forwards Director of Nuclear ReacLor Regulation order
further modifying SOO3I3 order u/respect to licenses !<
permits, for facilities
SALT2HAN.J Utility Finance Branch BO/06/11 Ip
0007110360 Forwards IE Bulletin BO-14, "Denradati oil of BWfi Hcram
Discharge Vol Capability " No written reiponne required
KGPPLER.J 0 Unginn 3, Chicago, Office of the Director BO/04/IS
B007EB0653 Forwards IE Info Notice (30-3B, "Prompt Ropiirtiiig of Info in
Accordance W/10CFRSO 35(e) " No written roaponsc roo,uired
KEPPLEfi.O 0 Region 3. Chicago. Office of the Director BQ/O4./13
ip
273
OO07020S63 Forward* IE Circular 00-15. "Loss of Reactor Laolant Pump
Coo linfl t> Natural Circulation Cooldoun " No written response
required
KEPPLEH.J B Region 3. Chicago, Office of the Director 00/06/20
OQ0716099Q Interim deficienrij repl re use of Mono-bol 7-OO1S-1
CMS polyvingl alchohnl film.uaCei stilulilo fiurgu dam motl
Util is in process of identifying OcflciEnt matl !. having
chemical analysis performed hnial rept provided by B01HJ5
DAVIDSDN.D R Cleveland Electric 1 1 luminnling Co 00/O7/U
3pp
B0071704iS Forwards IE Circular 00-14, "Radioactive Contamination of
Plant Denlnerallted Uater SUB b Resultant Intomal
Contamination of Personnel " No written response requirofl
KFPPLFR. J O Region 3j Chicago. Dffico of the Director QO/06/21
OOO71B0545 AL k receipt of B0062S interim deficiency mpt t-e Cutler-
Hammer motor control ctrs Final rept will lie reviewed upon
receipt
FIDRELL1.S Region 2. Atlanta, fieailor Construction t. rnfllneei-lng
Support Branch HO/07/14 lp
B00723031Q Forwards IE Bulletin BO-16. "Potential Miaapp 1 icalion of
Rosemount Inc Modeli 1181 fc 1 1S2 Pressure Transmitters
U/Either A or D Output Codes " Written response required
IE Circular flO-16 also end No written response required
KEPPLER.J B Region 3. Chicago, Office of the Director 00/06/27
IP
DOO71SO333 Submit 1 addl info re response to IE Bulletin OO-07 Litton
Industrial Product*, Inc & Fisher Co, Inc supplying Model hJH-
90 eeriei hodramotov actuators Deficiencies described
in IE Bulletin BO-09 will not affect performance of valve*
DAVIDSON, DR Cleveland Electric Illuminating Co BO/07/03 2pp
B00723O101 Forward i suppl info to B0061S respon«e to IE Bulletin BO-09
r« hudranotor actuator deficiencies Litton Industrial
Products, Inc, actuator* use Number 2 springs & have no
possibility of being fabricated from incorrect mail
DAVID5QN.DR Cleveland Electric Illuminating Co BO/07/03 2pp
BQ071B03BB Ack receipt of 800623 Itr informing NRC of steps taken to
corract violations noted in IE Imp Rept* 50-440/00-06 h
30-441 /BO-06
PIDRELLI'O Region 3, Chicago, Reactor Construction & Engineering
Support Branch BO/ 07/06 lp
--B0071B0391 Ruspands to NRC ,800921 Itr r> violations noted in IE In»p
R»pt» B0-«40/ao-06 d 50-441/BO-06 Training program compile*
a/NRC requirements Drawing D-EHO-OO2 to bo revised to show
sBlsnlcafly adequate lighting supports
DAVIDSON, D.R Cleveland Electric Illuminating Co BO/QA/23 4pp
DOCKET 30-141 PERRY NUCLEAR PUHCH PLANT, UNIT a
A ApplicatiDn/conatruclion Btnge dticumentfi t< corros|i-ondetic(i
SOO7020214 Foruiarila NHC Ofc of Nuclear Hoactor fleouHition OOOISi)
rnorflani inbion ihnrt Necessary par lad nf tratiEition mailo
u/min disruption to nnsoiug activities
TEDEBCO.R L ft»si»tant Oiroctor for Licensing 00/06/13 Bpp
0007230001 Forwards statement nf polity ro rpnuir empn ts to be mot For
current QL app 1 icationo, as derived from NURCG-OfciiO R founi)
in NUREC-0691
ElHENHl>T,D 0 Division Of Licensing BO/Oi./a;> 2p p
B00715O940 Submits list of thanges util plane to mako re environ
monitoring program during cnnr.t Rationale for changes and
R Cleveland Electric II lumin.it tng Un QO/07/O7 Spp
0 Ad jud icatorij cnrresponilenci1
B00731oa"13 Forwards Commission 000^27 memoTflndum I, order containing
decisions on UCH 700!)OH petition for -tec onaid orflti on of
700413 memorandum b order UCS /71I04 petition soual't action
ro fire protection for electrical caftlos
EIBCNHUT.D 0 Division of Licensing BO/0&/2S B7pn
H General correspondence
B0071B040& Forward* rosponse to IE Bulletin BO-OB re Biaminntlon of
containment liner panitration uelds List* penotrations in/
fluad head design
DAVIDSON, D R Cleveland Electric II luminatinn Co 00/07/10 5pp
8QQ7J8O3B2 Ack receipt of BQQ623 Itr informing NRC of steps t alien to
corrtct violations noted in IE Insp Rvpts 50-440/00-07 It
90-441 /BO-07
FIORELLIi 0 Region 3, Chicago, Reactor Construction b Engineering
Support Branch BO/O7/10 lp
— BOD71B05S3 Forwards response to NRC BOO 521 Itr re violations noted In
IE Insp R»pt« 50-440/BO-07 (r 50-44I/BO-07 Corrective
actions, OC Procedure B reviaed, analy led compaction
equlpnent b QC procedure for soil Insp being revised
DAVIDSON, DR Cleveland Electric illuminating Co BO/04/23 ipp
BO0723O313 Ack receipt of BOO703 Itr informing NRC of steps taken to
correct violations noted in IE Imp Repts 50-440/BO-OQ fc
SO-441/BO-Oa
FIORELLIiB. Region 3, Chicago* Reactor Construction I< Engineering
Support Branch HO/O7/19 lp
— BOO7 330321 fiespondi to NRC 800604 Itr re violation* noted in IE Imp
Repts SO-440/flO-OB h 50-441/BO-OB Corrective actions
obtained codes It *tdi for Pullman Pouer Products ueldlng
matl,
DAVIDSON.D R Cleveland Electric Illuminating Co 00/07/03 3pp
B Reportable occurrencas, LER» tt related corrBspondence
B007230S12 Forwards NOC 1979 Annual Rept in response to OOOftSl i-eque»t
re progress of nuclear power & reflulntioni on pouior plants
Unit 1 will start operation in l'JQ4 t. Unit 2 In 19I3U Cover
sheet onhj end
DENTON.H K Office of Nuclear Reactor ftegulot i on, Director
BO/06/27 3pp
B007330101 KoruiardSi under separate COVPI , flcunptanc B reviau copg nf OL
application! ronsintlng of application t environ ropt for
placement in Perrg.OII Public Librnnj Util will submit TBAH
on 000904 for review
BOUDER.J L Division of Kulei and RecurifD HO/07/O/ lp
M Antitrust curraspondoncc
0007H0231 Forwards Diructor of Nuclour Ftcnttur Regulation oriler
further modifying BOO'JIS orJor u/respoct to licenses l<
permit* far facilities
SALTZMAN,J Utlllly I'inaiiCP Itrailch flO/06/11 lp
80071403S6 Forwards Dirnctur of Nuiloor Realtor Rogii I tit i on ordor
further modifying 000913 order w/rpspert to licoiinoo fc
permits for fflcilitioa
BALTZMAN.J Utility F-lnaiKD Branch OO/06/11 lp
—0007110263 Order orinftifl Ditcnslon until BOO709, t ur Cleveland ITluctric
Illuminating Co to file amend tn tariff u/rERC a& reiiulred
by 000913 order
DENTON.H H Office of Nuclear [teoctor fiognlot Ion, Director
SO/06/11 2pp
8007180495 Ac* receipt of 80063O final dsficiency rept re Ro»emount
Hddel 510 DU trip callbr uniti/ttsa pressure transmitter*
Review will be completed during future imp.
FIDRELLItO Region 2, Atlanta. Reactor Construction t, Engineering
Support Branch BO/Ot/M lp
B00714O334 Part 31 rept r« deficiencies of Cutler-Hammer motor control
ctr* Cause undetermined Proposes that starter units u/
improper wire be returned to manufacturer for rewiring b
that splice plate carriage bolts be replaced
DAVIDSONi D, R Cleveland Electric Illuminating Co 60/06/25, 2pp
B0070S0294 Final deficiency rept re Rosemount Models 910 DU trip/calibr
units St 1193 pre**ure transmitters Originally, reported by OE
per Part 21 in May 19BO Amplifier boards b trip units will
be replaced beginning Sept 19BOj w/comp letion by B10101
DAVIDSON.DR Cleveland Electric Illuminating Co 80/06/30 Spp
8007140B79 Conditional request for hearino re Comml t.n ion QOD9C) ordor
re mod of transmisaion tariff tiroes mod of orJcr fcn bring
consistency u/FCRC tariffs in Opinion D4 or innli tut I o-n of
hearing Util protest before FI~nC ti CHrtificatL- of Qvc one 1
GDLDBERO.il , WAGNER, T T Cleveland. Oil QU1.DHEDO.F1 Qoldbur?,
rieldman b Hjelmfolt 00/07/09 14pp
Q007390533 [iesponse In opposition to CUg of Cluvelnnd- Ull BOOfiQI
raa.UBst for hearing re Director of Nuclear Ruoclor
Regulation 900513 order Tl ling, roquuat ing tariff w/rERC.
brings controversy to end IU/D lltlgous courso
REYNOLDS, W D , ZrtHLCR, R E Cleveland Electric 1 1 luini tinting Co
flEYNOLDa.U B Shaw, Pittman. I'ott* >< Troiubridgu BO/07/23 9pp
274
DOCKETED ITEMS
0 Inspection reports. IE Bulletins J, correspondence
8007140551 Forwards IE Bulletin 90-13, "Cracking in Core Spray
Spargers " No written response required „„,„„,,„
KEPPLER.J 0 Region 3. Chicago, Office of the Director 00/09/12
0007090154 Forwards IE Insp Septs 50-440/SO-07 (. SO-441/BO-07 on
600509-07 !, notice of violation
FIORELLI.O Region 3, Chicago, Reactor Construct ion S. Engineering
Support Branch BO/OS/2I 2pp
-B007090IS6 Notice of violation From tnsp on 900905-07
» Region 3. Chicago, Office of the Director SO/05/19
Spp
--800709Q1S9 IE Insp Hepts 3O- 440/90-07 8, SO-44I/BO-07 on B00309-07
NoncompIiancE noted inadequate issuance of documents,
inadequate quality records- InaflequatE instructions fe failure
to follow procedures for soil placement
HAVES, D W Region 3, Chicago. Reactor Construction t, Engineering
Support Branch GALLAGHER, E J , LANDSMAN, R L Region 3, Chicago.
Office of the Director BO/05/19 6pp
8007090174 Forwards IE Insp Repts 50-440/BO-Q6 t, 50-441/90-06 on
800421-24 t. notice of violation
FIORELLI.O Region 3, Chicago, Reactor Construction «• Engineering
Support Branch 60/09/21 Spp
— 8007090178 Notice of violation from insp on 800431-24
* Region 3, Chicago, Office of the Director BO/03/li lp
— B007090179 IE InBp Repts 5O-440/BQ-06 & 90-441/BO-O6 on 000431-24
Noncompliance noted failure to identify component to be
covered oy QA program Si inadequate Indoctrination &
training of personnel
HAYES, D U Region 3. Chicago, Reactor Construction It Engineering
Support Branch HU0HES, J . LANDSMAN, R B Region 3. Chicago,
Office of the Director 30/09/16 6pp
0007010139 Forwards IE Info Notice 80-33. "Loss of Suction to Emergency
Feeduater Pumps " No written response required
KEPPLER, J 0 Region 3. Chicago, Office of the Director 00/03/39
BQ071o0725 Forwards IE Insp Repta 50-440/BO-08 t, 50-4-1 1 /BQ-OB on
800506-09 t, notice of violation
FI0RELLI.B Region 3. Chicago. Reactor Construction b Engineering
Support Branch BO/06/04 Spp
--B007160734 Notice of violation from insp on B009O6-09
n Region 3, Chicago, Office of the Director BO/ 06/03, lp
0007230310 Forwards IE Bulletin 80-16, "Potential Misapplication of
Rasemount Inc Models 1131 fc 1132 Pressure Transmitters
H/Either A or D Output Codes " Written response required
IE Circular BO-16 also end No written response required
KEPPLER. J 0- Region 3, Chicago, Office of the Director SO/06/B7.
IP
H0071S0533 Submits addl info re response to IE Bulletin 6O-O1?. LI tton
Industrial Products, Inc b Fisher Co, Ine suppluing Model NH-
90 series hydramotor actuators Deficiencies; described
in IE Bulletin BO-O9 will not affect performance of valves
DAVIDBON.D R Claveland Electric Illuminating Co BO/07/03 3pp
0007230101 Forwards suppl Info to BOOilfl response to IE Bulletin BO-09
re hodromotor actuator deficiencies Litton Industrial
Products, Inc, actuators use Number B springs t have no
possibility of being fabricated from Incorrect mail
DAVIDSON.D R Cleveland Electric Illuminating CO BO/07/O3. Spp
S007ia03SB Ack receipt of 000623 Itr informing NRC of steps taken to
correct violations noted In IE Insp Hepts 3O-440/BO-06 tt
. . „ ,
FIORELLI-0 Region 3, Chicago, R«actot- Construction fc Enoin««rlna
Support Branch BO/07/OB lp
— B0071SOS91 Responds to NBC 800521 Hr re violations noted in 1C Ins"
Repts ao-440/80-06 & SO-44 1 /BO-Oi Training program eo«tpll«i
w/NRC Ts^ulfeniBnt* Qrauinn 0-820-003 to bv revised to "how
stisnlcally adoquate lighting supports
DAVIDSON." R Cleveland Electric Illuminating Co. 8CV06/a3 4pp.
B0071B0406 Forwards response to IE Bulletin 00-09 r» exawlnation of
containment liner penetration urelds Lists penetrations w/
fluid head deslan
DAVIDSON.D II Cleveland Electric Illuminating Co. 00/07/10. Bpp.
B0071SOSB3 Ach receipt of 8006H3 Hr informlna NBC of sttp* t*fcen to
correct violations noted In IE Imp Repts 30-440/80-07 tc
90-44 l/SO-07
FIOHELLI.O Region 3, Chicago, Reactor Construction * Enp,ln«BrinB
Support Branch HO/07/1O lp
— 80071 QD5P5 Foruardi ruipona* to NRC 800321 Hr re violations noted In
IE Insp Repts 30-440/80-07 (c 30-441/80-07. Corroctiva
actions OC Procedure B revlaed. jmalyivd compaction
*q.uipnmnt k QC procedure for soil Insp being revised.
DAvIDSON,D,R Cleveland Electric Illuminating Co 80/06/33. App
0007S30313 Aek receipt of B00703 Itr infornino NHC of »tep« taken to
corract Violations noted In IE Insp Reptt SO-440/BO-OB fc
30-441 /BO-OB
FIO«ELLI,0 Region 3, Chlc«9O, Reactor Conitruction t Engineering
Support Branch 80/07/13 lp,
—8007160741 IE Insp Repts 50-440/BO-OB !< 30-441/80-08 on 800306-09,
Noncoopllance noted failure to specify appropriate tadeB or
stds in purchase order
LEE.E H Region 3. Chicago, Office of the Director
DftNIELSON, D K Region 3, Chicago, Reactor Construction fc
Engineering Support Branch 00/06/02 6pp
0007220179 For war Os IE Info Notice 00-26, "Evaluation of Contractor
QA ProgramK " No upitten response req,uired
KEPPLER.J 0 Region 3, Chicago. Office of the Director BO/06/10
lp
B007140360 Foruards IE Bulletin 00-14, "Degradation of BUR Scram
Discharge Vol Capability " No written response required
KEPPLER,J G Region 3. Chicaoor Office of the Director 80/06/12
80072604 5P Forward B IE Info Notice 80-38. "Prompt Reporting Of Info in
Accordance M/10CFR50 55(e) " No written response required
KEPPLER.J Q Region 3, Chicago, Office of thB Director BO/06/13
8007020569 Forwards IE Circular BO-19, "Loss of Reactor Coolant Punp
Cooling fc Natural Circulation Cooldouin " No written response
requirBil
KEPPLER. J 0 Region 3, Chicago, Office of the Director BO/Oi/20,
8007170163 Forwards IE Circular BO-14, "Radioactive Contamination of
Plant Dentineral ited Water- Syt & Resultant Internal
Contamination of Personnel " No lurlttan response required
KEPPLER.J 0 Region 3, Chicago, Office of the Director 80/06/24
If
—8007330321 Responds to NRC 800604 Itr r» violations noted In IE In»a
Repts SO-440/BO-OB & 30-441/HO-08 Corrective action*:
obtained codes fc stds for Pullman Power Producta welding
matl
DAVID80N.D.R Cleveland Electric Illuminating CD, BO/07/03, 3»p.
B Reportable occurrencos, LERs & related correspondence
B007IB0493 Ach receipt of 800630 final deficiency rept ?a Roseiaount
Model 910 DLJ trip calibr units/1152 pressur* transmitter*.
Review uiill be completed during future insp
FIOftELLI,0 Region Si Atlanta, Reactor Construction i Engin>*ring
Support Branch SO/06/14 lp
B0070B0294 Final deflciencu rept r» Rosemounl Modtls 310 OU trlp/c«lltr
units & 1132 pressure transmitters Originally reported by 0E
per Part 21 in Maij 1980 Amplifier boards l< trip units will
be replaced bvglnning Sept 19BQ, u/cqnp letlon by 810101,
DAVIDSON.D R Cleveland Electric Illuminating Co, BO/ 06/30. Una,
800716039B Intsrlm deficiene« rept re use of Hono-Sol 7-0013-3
CWB polgvinijl alchohol f ill", water soluble purge daM Mitl.
Utll is in process of idantlfving deficient matl tt having
ch*mlc*l analysis performed Final rapt provided bg 001219.
DAVIDSON- D R Cleveland Electric Illuminating Co, BO/07/11. 3p(t,
B0071B0943 Ack receipt of BOO6Z3 interim dtficlenEU Npt re
Hanuner motor control ctrs, Final rept uill be revitwad Upon
receipt.
FIORELLI.O Region 2, Atlanta. Reactor Construction l< Ena
Support Branch. 80/07/14 lp
DOCKETED ITEMS
275
DOCKET 30-443 BEABROOK NUCLEAR STATION. UNIT 1
A Application/construction stage documents St correspondence
BQO7S1O013 Confirms request For BOO703 meeting m/utll In Seabrook.NH
to introduce NRC senior resident inspector & discuss
quality matters re const
CARLSON, R T Region 1, Philadelphia. Reactor Operations Nuclear
Support Branch 00/06/29 lp
I Financial information
9007080010 Forwards Annual Financial Rept 1979 for each owner of
facility
RITSHER.J A Rnpos !. Gray SQ/07/03 2pp
--B007O80O1 I Annual Financial Hept 1979
« Public Service Cu of Neu Hampshire BO/07/03 23pp
B007230O01 Forward* statement of policy re requirements to be mat for
current DL applications. as derived From NUREQ-0660 & found
in NUfiEO-Oe.94
EISENHUT. D 0 Division of Licencing B0/0i/2i 2pp
SOQ71800&3 Notifies that ABME Code Case N-103-1 (1713-1) is acceptable
b may be used in con it of components for facilities Use of
tods case should bo documented in FBAR
VDUNOBLODD. D J Licensing Branch 1 BO/07/09 Spp
--BOO7O80O13 Annual Financial Ropt 1979
» United Illuminating BO/OJ/O4 30pp
--BO07O8Q014 Annual Financial Rept 1979
* Neui England Power Co 80/01/35 SOpp
— BOO7OBOO16 Annual Financial Hept 1979
» Central Maine Power Co 00/02/14 34pp
8007260-} 39 Submits alternate method of mitigation effects of grid
degradation on safety-related electrical equipment
Engineering for mods uill be completed by Nov I9BO
VANDENHUROHj D Yankee Atomic Electric Co 80/07/24 7pp
0 Adjudicatory correspondence
80O7020&02 Order granting "Utenslon until B00711 for Commission to
•lact whether to review ALAB-422 & ALAB-S61
CHILK, B J Office of the Secretary of the Commission 80/06/27
B00714Q409 Submits Town of Salisbury, MA Article 13, approved at 800513
toun meeting, re F Kramer petition opposing OL for Public Bvc
Commission of NH Area surrounding facility cannot be safely
Bvacuated t no town funds uill be apnnt
NORSE.W T Salisbury. MA 80/04/30 lp
8007140437 prder granting extension until B00801 for Commission to
revlau ALAB-422 & ALAB-361
HOYLE.J C Office of tKe Becretary of the Commission BO/07/1O
—8007080018 Annual Financial Rept 1979
« Central Vermont Public Service Corp BO/02/1!
33pp
— B0070B001 9 Annual Financial Rept 1979
» Fitchhurg Oas *< Electric Linht Co BO/02/07 23pp
--B0070B0020 Annual Financial Rept 1979
* Eastern Utilities Associates 80/03/06 33pp
— B0070B0023 Annual Financial Rept 1979
* New Dedford Oas t< Edison Light Co BO/03/23 4&pp
— 8007080023 Annual Financial Rept 1979
« Hudson Light (. Power Rapt 80/07/03 16pp
— B0070B002B Annual Financial Rept 1979
* Vermont Electric Cooperative. Inc BO/03/O7 24pp
--80070B0031 ftnnual Financial Repl 1979
» Bonoor Hydro-Electric Co SO/OJ/26 35pp
H General correspondence
BOO7020090 Responds to 791011 Itr requesting const of plant be halted
until safe evacuation plan can ba achieved, Licensee must
•ubntt evacuation study for NRC revioiu & approval before OL
is issued,
BENTDNiH R Office of Nuclear Reactor Regulation, Director
80/06/11 Spp
—8007030096 Requests that NRC reply to BC Dunfay 791011 Itr opposing
plant const until adequate evacuation plan is achieved
Supporting documentation encl
SEAL.H M President of UB l< Eiecutive Offices 79/10/19 6pp
B0071QO4S1 Responds to 791011 Itr to President Carter asking that const
of facilities be halted until evacuation plan can be
aehlevad Emnrgencu planning revleus of plant* under const
uill start ulthin neit ur
DENTON.H R Office of Nuclear Reactor Regulation, Director
00/Oi/ll Hpp
--8007080033 Annual financial Rept 1979
• Taunton Municipal Lighting Plant 80/03/33 19pp
-- B0070B0037 Annual Financial Rapt 1979
* Massachusetts Municipal Wholesale Co BO/03/03
— BQ070B0038 Annual Financial Rept 1979
* Maine Public Service Co BO/03/15 2lpp
— 80070B0040 Annual Financial Rept 1979
» Connecticut Liglit 6 Pouier Co BO/03/14
Q Inspection reports, IE Bulletins !< correspondence
8007010263 Forwards IE Info Notice BO-Z3, "Less of Suction to Emergency
Feeduater Pumps " No written response required
OR1ER.B H Region 1, Philadelphia, Office of the Director
BO/05/29 lp
B0071O0424 Responds to 791011 Itr to President Carter asking that const
of facilities be halted until evacuation plan can be
achieved Emergency planning reviews of plants under const
will start uithln neit yr
DENTONiH R Office of Nuclear Reactor Regulation, Director
BO/06/11 2pp
6007350319 Forward! IE Imp R«pte SO-443/BO-01 b 90-443/80-04
citing violations rn Caduell splicing & ueld rod control in
containment bldg W/o encl
CARLSON. R T Region 1, Philadelphia, Reactor Construction h
Enaineering Buppor-t Branch SO/06/30 lp
B0072306S2 Responds to 800 SOB Itr to President Carter re facility
lictnving NRC revieued environ impacts of project prior to
making decision on CP issuance, Fac i 1 i tij poses no threat to
environ or public health tt safety
YOUNOBLOOD, B J Licensing Branch 1 BO/07/15 Spp
8007840474 Partial response to F01A request for five categories of
documents re facility licensing proceeding. Foruard« NUREQ-
034 B & 800311 & 0702 ltr» Raquest has titan circulated for
•ddl matl that may be aval lable. Ltrs only encl
FELTQN..J M Division of Rules and Records 80/07/81 lp
8007010219 Acfc receipt of B00505 Itr informing NRC of steps taJion to
correct violations noted in IF Insp Rept» 50-413/BO-03 6
30-444/80-03
CARLSON.R T Region 1, Phi ladelpliia, Office of the Director
BO/03/30 lp
— B007010H83 Responds to NRC B00401 Itr re violations noted in IE Insp
Repts 50-443/BO-03 !. 50--) 41/80-03 Corrective actions
procedures ro Eluit welding insp instituted
DEVINCEMTIS. J Public Service Co of Neiu Hampshire 80/05/03
3pp
— H007010229 Forwards IE Insp Repts 50-4-13/80-D3 !. 30-444/BO-03 on
80033(4-28 fc notice of violation
CAHLSON,R T Rc-oion 1, Philadelphia, Reactor Construction t.
Engineering Support Branch BO/04/O1 2pp
— B007010B32 Notice of violation from Insp on 800226-28
* Region 1. Philadelphia, Office of the Director BO/03/31 lp
276
— BOO-7010235 IE Insp Repts 50-44 3/80-03 V 50-414/90-03 on
Noncompl lance noted u 1 1 J failed Co conduit sti'd welding insp
as required ft failed to rontrol changes to assure affected
c onlrac tor procedures
CERN5, A C . MCGAUOHVpfi U Region 1, Phi Isdolphia. Off-ice of She
Director BO/03/31 7pp
8007210613 Forwards IE Info Notice BQ-26, "Evaluation Dp Contractdr
OA Programs " Nn written response required
CRIER.B H Region !, Philadelphia. Office of the Director
BO/06/10 !p
BOO71(b0363 Forwards IE Info Notice BG-27, "Degradation of Reactor
Coolant Pump Studs ' No specific action or response
required
GF1IER,B H Region 1. Philadelphia, Office of the Director
8Q/O6/11 Ip
00071B0062 Notifies that flSME Code Case N-103-1 (1713-1) la accap table
& may be used in const of components for facilities Us* of
rode case should be documented in FSAR
VQUNOtJLOOD, D J Licensing Branch 1 80/07/0"? 2pp
B007290439 Submits alternate method of mitigation effect* of or-iri
degradation an safety-related electrical equipment
Engineering for mods mill bit completed by Nov 1180
VANDENBURGH, D Yankee Atomic Electric CD 80/07/24 7pp
O Adjudicatory correspondence
B0070206O2 Order granting extension until HOO711 for Comnlsainn to
elect whether to review ALAB-432 i. ALAB-S61
CH1LK.S J Office of tha Secretary of the Commission BO/O6/S7
IP
BO-072S06I6 Forwards IE Infa Notice BO-2B, "Prompt Reporting of Info in
Accordance U/lOCFR'iO 53(e) " No written response required
CRIED. B H Region 1. Philadelphia. Office of the Director
BQ/Q6/13 Ip
HOO7O20S24 Forwards IE Circular BO-I3, "Loss of Reactor Coolant Pump
Cooling (. Natural Circulation Cooldown " No written response
required
GR1ER.H H Region 1, Philadelphia. Office nf the Director
BO/O6/SO Ip
BOO7140409 Submits Touin of Salisbury, MA Article 13, approved at 80O313
town mooting, re F Kram»r petition opposing OU for Public Bvc
Commission of NH Area surrounding facility cannot be safely
evacuated & no to inn fund* Dill be spent
MORSE, U T Salisbury, MA BO/06/30 Ip
0007140457 Order granting extension until SOQQ01 fur CotnnliBlon to
review ALAD-432 »- ALAB-S61
HDVLE, J C Office of the Secretary of the CommioBion 80/07/10
IP
3007160740 Forwards IE Circular BO-lfl. "Radioactive Contamination Of
Plant Deminerali led Uater Sys !/ Resultant Internal
Contamination of Personnel " Ho written response required
GFUER.B H Region 1, Philadelphia. Office of the Director
BO/O6/24 Ip
B 00731 OSS 1 Foruiards IE Info Notice 30-34, "Lou Level Raduasbe Burial
Criteria " No written response required
SRIER,B H Region 1. Philadelphia, Office of the Director
90/06/25 Ip
6007230633 Rnsponds to IE Bulletin BO-OB, "Eiamination of Containment
Liner Penetration Welds " Each unit has 1? penetrations u/
flued head design All flued head penetrations to lie butt
welded to sleeves using consumable Inserts
QEVINCENTIB, J Put-lie Service Co of New Hampshire 80/06/35 2ap
0007330178 Forwards IE Bulletin 00-16. "Potential Misapplication of
Rosanaimt Inc Models 1191 ti 1153 Pressure Transmitters
W /Either A or D Output Codes " Written response required
IE Circular BO-16 also enc 1 No written response required
CfUER.D H Region 1, Philadelphia, Office of the Director
BQ/06/27 2pp
3 H*portable occurrences, LERs & related correspondence
BOO701OlBa Acfc receipt of BO091S final deficiency rept re undetected
failure in engineered safetv features actuation sys
CARLBON.R T Region 1, Philadelphia, Reactor Construction (•
Etiflin&ering Support Branch 8O/O6/06 Ip
BOO71703B9 AcJ receipt nf 800530 interim deficiency rept on use of
invalid seiimic amplified response spectra fiept mill be
reviewed d evaluated
CftRLSOM.R T Region I, Philadelphia. Realtor Construction fc
EnBineennB Support Drancli BO/06/12 Ip
— 80O717O596 Advises that fjna! deficiency rept re use of invalid seismic
amplified response spectra originally promised for 300601
Hill be delayed until 90090) Ongoing corrective action not
sufficiently complete to render final rupl
, J Public Service Co of Noui Hampshire BO/05/30
DOCKET BO-444 EEfluROOK NUCLEAH STATION, UNIT 2
A Application/construction sitagp documents t. correspondence
B007?10O13 Confirms request for R007O3 meetin(| u/util in Seabrook.NH
tn introiluce NRC senior resident inspector !i discuss
quality matters re const
CARL5QN,H T Region 1, Philadelphia, Reactor Operations Nuclear
Support Branch 00/O6/35 Ip
B007230001 Foriiiards statement of policy re requirements to be met for
current OL applications. as derived from NUfEG-0660 J< found
in miHEC-0694
EISENHUT.D S Division of Ucensmg BO/O6/26 2qp
H General correspond enc
B007020090 Responds to 791O11 Ur raqueiting const of plant b« haltad
until Bafa evacuation plan can be achieved Llctnlci muit
submit evacuation study fur NRC reviBu t approval before OL
is Issued
DENTQN, H R Office of Nuclear Reactor Regulation, Director
80/06/11 3pp
— B0070300?6 fiectuasts that NRC reply to EC Dunfey 791011 Itr oppotinj
plant const until adequate evacuation plan is achieved
Supporting documentation encl
SEAL.M H President of UB t, Ejecutive Offices 79/10/19 App
8007100421 desponds to 771011 1 tr to President Carter asking that tonit
of facilities be halted until evacuation plan can be
achieved Emergency planning reviews of plants under con«t
mill start uithin neit yr
DENTDN.H H Office of Nutlear Reactor Regulation. Director
00/06/11 3pp
3007100^34 Responds to 791011 Itr to President Carter asking that eon«t
of facilities be halted until evacuation plan can b*
achieved Emergency planning reviews of plants under conit
will start uiitliin neit yr
DENTON.H R Office of Nuclear Reactor Regulation. Dirsetor
00/06/11 2pp
8007S30632 ResponoB to B.Q030B Itr to President Carter re facility
licensing NflC reviewed environ imparts of project prior to
making decision on CP issuance Facility pones no threat to
anviron or public health t> safety
YOUNOBLOOD, H J Licensing Branch 1 00/07/13 2pp
8007240474 Partial response to FDIA request for five catagorle* of
documents re facility licensing proceeding Forwards NUREO-
0340 d 800311 d 0702 Itrs Request has boen circulated for
addl matl that may be available Ltrs only encl
FELTON.J M DiviBion of Rules and Records 00/07/31 Ip
1 Financial information
B00700001O Forwards Annual Financial Rept 1979 for ench ouiner of
facility
RITSHER.J A Ropes & Gray 8O/07/03 Spl>
—0007000011 Annual Financial Rept 1979
# Public Service Cn of NBLI Hampshire 80/07/03 SBpp
--B0070B0012 Annual rinancial Dept 197-7
» United 1! luminating HO/0 1/04 30pp
— -8007030014 Annual Financial Rept 1979
» Noui England Power Co HO/01/23 20pp
--B0070B0016 Annual Financial Rept 1979
* Central Maine Power Co BO/02/14 34pp
277
— BO07QBQO1B Annual Financial Ropt 1979
» Central Vermont Public Service Corp 80/03/15 33pp
— B007080019 Annual Financial Rept 1979
» Fitchburg Gas & Electric Light Co BO/O2/O7 35pp
-8Q070BOD20 Annual Financial Hept 1979
» Eastern Utilities Associates QO/O3/0& 33pp
-8007QB003B Annual Financial Rept 1979
ft New Bedford Gas & Edison Light CD BO/03/2S 4ibpp
-B007QB002S Annual Financial Rept 1979
* Hudson Light & Power Dopt 30/07/03 16pp
B007030D24 Forwards It Circ.ilai HO-15, "Lass of Reactor Coolant Pump
Conling »< Natur.il Cinulation Cooldoun " Nu written response
required
ORIER.li H Jienion 1, Philadelphia, Office of the Director
BO/06/20 Ip
BOO716O740 Formal-da 1C Circular BO- 14. "Had ioai t i ve Contamination of
Plant Demlneral nod Water Sys te Resultant Internal
Contamination of Personnel " Nn written response required
GRIER.D H Region 1, Phi ladolph la, Office of the Director
BO/O6/24 Ip
BO0721O2ai Foruards IE Info Notice BO-S4, "Lou Level Radwaste Durlal
Criteria " Nn written response j squired
ORlEfl.D H Region 1, Phi laiteluhia. Office of the Director
BO/06/25 Ip
--BQ070B002B Annual Financial Rept 1979
ft Vermont Electric Cooperative. Inc BO/03/07 34pp
— B0070BQ031 Annual financial Rent 1979
• l)anoor Hydro-Electric Co 80/03/26 23j>p
-80070BOQ33 Annual Financial Rapt 1979
* Taunt on Municipal Lighting Plant BO/02/23 19pp
— B0070B0037 Annual Financial Rept 1979
ft Maosacbuaettii Municipal Wholesale CD 00/03/03 Itpp
-BQ07080030 Annual Financial finpt 1979
* Maine Public Service Co BO/03/15 Slpp
~ 3007000040 Annual Financial Rept 1979
* Connecticut Light b Power Co BO/03/14 21pp
B00725O623 Responds to IE Bulletin BO-OB. "Eiomination of Containment
Liner Penetration Welds " Each unit hae 19 penetrations w/
flued head design All fluud he.id penetrations to be butt
melded to sleeves using consumable Inserts
DEVINCENTIS, J Public Service Co of N0U) Hampshire BO/06/25 Bpp
B00723O17B Forwards IE Bulletin BO-16, "Potential Misapplication of
Rosemount Inc Models I1SI !< 1113 Pressure Transmitters
W/Either A or D Output Codes " Written response required
IE Circular 80-16 also enc I No written response required
QRICR.B H Region 1, Philadelphia, Office of the Director
BO/06/27 2pp
S Repnrtable occurrences, LERs & related correspondence
B0070101B2 Ack receipt of BOOS1S final deficiency rept re undetected
failure in engineered safety features actuation BIJS
CARLBDNi R T Region 1. PhilaiJelphifli Reactor Construction d
Engineering Support Branch 80/06 /Oh Ip
Q Inspection reports, IE Bulletins (< correspondence
SO0701O2&9 Foruards IE Info Notice BO -S3, "Loia of Suction to Emergency
Fiedwatnr Pumps " No written raapanse rnqutred
CftlER, B H Region 1. Phlladalphla. QffitO Of tho Director
OO/OS/Hv 1 p
BO0701Oai9 Acfc rocolpt of HO0305 Itr informing NRC of steps takon to
corr»ct violationo noted in IE Inap Ropts 50-143/BO-03 fc
BO-M4/QO-03
CARLEONiR T Region 1. Philadnlphia, Office of the Director
00/05/30 Ip
8007170939 Ack receipt of 800530 interim deficiency rept on use of
invalid seismic amplified rusponsp spectr.1 Rept mill be
revi euied Ii evaluated
CARLSON, R T Region 1. Philadelphia. Reactor Construe tlnn b
Engineering Support Brant. h 80/06/13 Ip
— B007170596 Advises that fliiiil tfef ic iencg rept re use of invalid seismic
amplified rcuponue spectra originally promised Cor B00601
will be delayed until S00901 Ongoing corrective action not
Buf Fie iontli| complete to render final rept
DEVINCEMTJ3, J Public Service Co aP Neia Hampshire BQ/OS/30
Sff
— 0007O1O223 Reflponds to NRC HQ04O1 i fr re violations noted in IE tnnp
ReptB 50-443/80-03 *. 90-444/80-03 Cori-ectivs actions
procedures re stud welding insp instituted
DEVINCENTIS, J Ptiulic Service Co of Neui Hampshire BO/05/05
3pp
— B00701OH39 Forwards IE Inap Repts 30-443/60-03 fc 30-444/60-03 on
BOOaa6-28 fc notice of violation
CARLSON, Ii T Rt-glon li Pli 1 ladelpliis. Reactor Construction !<
Ensinaering Support Branch HO/04/O1 Spp
— B007010333 Notice of violation from Insp on 8002 S 6 -38
» Region 1. Philadelphia, Office of the Director BO/03/31 Ip
—8007010239 IE Insp Reptt 50-443/BO-03 t< 50-444/BO-03 on 8002B6-2B
Noncompl iante noted util failed to conduct stud welding Inap
aa required tc failed to control changes bo assure apfDcted
contractor procedural
CERNE.A C . MCOAUOHV.R W ReB'on 1, Philadelphia, Office of the
Director 80/03/31 7pp
B007210613 Toruiards IE Info Notice BO-2&, "Evaluation of Contractor
QA Programs " No written response required
ORIER.D H Rogion 1, Philadelphia. Office of the Director
BO/Oi/10 Ip
0007160363 Forward* IE Info Notice BO-S7. "Degradation of Reactor
Coolant Pump Studs " No specific action or response
required
WUER, B H Region 1, Philadelphia, Office of the Director
BO/06/ 11 Ip
Foruards IE Info Notice BO-BB. "Prompt Reporting of Info in
Accordance W/10CFR90 9S(e) " No written response required
CRIER.B.H Region 1. Philadelphia, Office of the Director
80/06/13 Ip
DOCKET 50-445 CQMANCHE PEftK F.TEM1 ELECTRIC 8TA .UNIT I
ft Application/construction slagp itocuniBnta !. correspondence
B007020234 Advises of filing of detailed e lee trical, Instrumentation &
control drawings submitted bij TX Utils 0-onerating Co Action
taken in conformance ui/NRC PM Operating Procedure 200,
Revision 1 Drawing B In Central Filet onlij
BURWELL.S Lici'nsinfl Branch P BO/06/Oi Ip
B00723000I Forwards btatement of policy re requiTcments to he met for
current OL appl lent ions, as derived from NUREQ-0660 !< found
jn NURCO-0694
EISENHUr, D G Division of Lirensing BO/06/3.1; Spp
B0071B036ii Foruar^B Freese S. Nichols. Inc B006SO Itr in response to NRC
B00419 request fur addl info re floodplain mg t Response will
be incorporated Into ulil environ rept
QARY.R 0 TOIBG IJtillties Generating Co HO/07/10 3pp
B007240066 Summary nf 8106P9 meeting br'tuieen Asulstant Director for
Environ Technology ti Assistant Dlrectoi for Licensing re
mgti technical oversight & mochamc* nf onvirnn review
performance
MULLEHiD R Assistant Director For tnvironmental Technology
TEDE9CO.R L Assistant Director for Licensing BO/07/14 4pn
8007210478 Foruardo e lectrica] . instrumonta tlon tt control drawings to
assist in plant rnviuu
OAHY.R J Texoi, UUlitins (lonerntlns Co BO/O7/15 2pp
-B007S104S5 "Control Panel Schematic " Sheet 1 of a
n De Laval Turbine Inc 76/07/16 Ip
-8007210490 "Control Panel Bthfmatic " Sheet 3 of B
» De Laval Furbino Inc 76/07/16 IP
278
— SQ0721Q496 "Control Panel Schematic " Sheet 3 of
* Po Laval Turbine Inc 76/07/16 Ip
— B0073I050Q "Contrnl PanBl Schematic " Sheet A at
* DD Laval Turbine Inc 76/07/16 Ip
BO07310167 Order affirming grant of addl time Par Citii*ni Association
far Sound Energy to respond to applicant 800701 nation fc to
file position TO fiSLB 800616 order Five-day extension for
Citiiens for Fair Util Regulation re NUREG-Oi94 granted
HCUEHB.e S Atonic Safety and Licensing Hoard Panel BO/07/1O
2pp
—9007310501 "Control Panel Schematic " Sheet 5 of 9
* De Laval Turbine Inc 76/07/16 Ip
— BQ07210508 "Control Panel Schematic " Sheet t of
* De Laval Turbine Inc 74/O7/16 Ip
— Q007aiOS10 "Control Panel Srhematic " Sheet 7 of B
• De Laval Turbine Inc 76/O7/16 Ip
— 8Q072103I4 "Contrnl Panel Schematic " Sheet 8 of B
* De Laval Turbine Int 76/07/16 Ip
— B007210517 "Interconnection Diagram " Sheet I of 2
« Do Laval Turbine Inc 77/04/O6 Ip
8007170261 Forwards NUREO-06V4. "TMI-Rolated Requirements fop Nau OLi,
per B00710 telcon Copies for warded to cltimns tor Fair
Util fieoulatiun t, Association of Community Organ! lot Ion* for
Reform Now U/o oncl
TURK.B E Hearing Branch 1 SO/07/11 tp
8007230946 Motion for reconsideration of ASLB B00430 ordur for
certification of denied contentions Maintains validity at
content) onsi espec ial lu, Class 7 accident scenario Certifieatn
of Svc one I
ELLI8.J Citizens Association for Sound Energy SO/07/ 14 SOff
8007320937 Suppl to intervanor H00714 notion for reconsideration or
certification of denied contentions re A8LB 900430 order
Submits new info in support of Contention 1 re State of TX
vs TX Utilo companies Certificate of Bvc end
ELLIS.J Citiiens Association for Sound Energy 8O/O7/14. 7ff.
— BOO7310519 "Interconnection Diagram " Sheet 3 of 2
« De Laval Turbine Inc 77/01/06 Ip
— BQ072I0927 "Schematics Diesel Generator Local Panel.1
« De Laval Turbine Inc * Delta Switchboard Co
Hill. Inc (subs of Dravo Corp ) 76/07/16 Ip
as-built
fl Glbbs &
8007180437 Response in opposition to TX Association of Conmunlty
Organizations for Reform Now B 00701 motion seeking
reconsideration of 000616 order denying cetain proposed
contentions Recording must be denied H/Certif ieate of five,
REVNOLDB, N B , HORIN.H A Toias Utilities generating CD
REVNOLDS, N 3 Debevoise b Uiborman SO/O7/16 ISpp
D NRC Draf t/Fiiiiil Environmental Statements, suppls !, correspondence
B007140033 Provides background info on schedule, content & form of
facilities OL stage environ review fnr initiation of
appropriate NEPA review I< technical oversight functions List
of reviewers, review schedule !< DEB outline end
SCHHENCER.A Licensing Branch 3 SO/O6/S6 Bpp
F Security, medical.
ergency 6 fire protection plans
BO07110976 Requests revisions fc add! inFo to safeguards contingency
plan ra evaluation of util application for DL Forwards
statement at NRC positions Response ehould be submitted
within 60 dai;s Statement withheld Iref IOCFR5 790)
BCHUENCER.A Licensing Branch S BO/Oi/23 2pp
B007230741 Hesponse in oppoaitian to TX Association af Connunlty
Organliationo for Reform Noui 800701 motion for
reennsideratlon of A3LD BOOA16 ordor Urges denial of
alternative motion for certification M/Cirtif icate of Bvc
TURK, 8 E Hearing Branch 1 B0/07/2t B4pp
B00723074B Response to applicants' 600701 objections re preheating
conference order 6 to applicants' motion for mod Urges
dental of requests re Contentions 3. 4, 7. 17 & 33 Motion to
delete Contention II must be granted W/Certi f icate of Bvc
TURK, S E Hearing Branch 1 80/07/31 IBpp
B0072907SB Order extending time until 800808 for Commission to rovi
ALAH-379
CH1LK, B J Office of tin Secretary of the Commission, BQ/Q7/S*
80070 BOaBa Advises that upgraded emergency plan for facility ulll be
submitted by BO 0930
BARYiR J Teias Utilities Generating Co BO/06/30 Ip
0 Adjudicator^ correspondence
B00731032B flesponse to CitHena Association for Bound Energy 800707
first set of interrogatories ft requests for clarification.
Explains communication u/publlc ra electric util matter*,
H/affidavIti Certificate of Bvc f* supporting documentation
REYNOLDS, N 8 . HDRIM.H A Texas Utilities Generating Co
REYNOLD3.N 8 Debevolsa 8. Liberman BO/07/28 36pp
B007310243 Forwards Commiasinn B00327 memorandum Sr order containing
decisions an Urs 7B0303 petition for reconsideration af
790413 memarandum 6 order UCS 771104 petition sought action
re fire protection for electrical cables
EISENHUT.D G Division of Licensing 00/06/23 B7pp
B007090327 Eiceptions to ASLB 900616 order re B0043D prehaoring
conference Order erred in rejecting intervenor Contentions
1.3,6(b)(e),a ft 1O t, conditioning acceptance of
Contentions 9 f, 33 Certificate of Svc enc 1
ELLIS, J Citiiens Association for Sound Energy BO/06/30 4pp
M Antitrust correspondence
B007010247 Forwards work order extending Hartl»y contract to BOO 931
and
BLUME.M B Antitrust Division 80/O4/14 Ip
B007010364 Faruarili signed ntipulatlon abiding by ABLB 800331
protective order re Houston Lighting fc Power corporate
study H/a one I
BLUME, M D Antitrust Division BO/04/tfl Ip
8007030244 Response in opposition to ASLB B00616 order re 800430
prehearing conference. ruling on admiBslbility of
contentions Urges mod of order to delete Contentions 3, 4. 9i
11 !. 17 t< to reuiord Contention 23 Certificate of Svc cncl
REYNOLD5.N a . HORIN.W A Teias Utilities Generating Co
REYNQLDS.N 8 Dehevntsu & Liherman 80/07/01 17pp
8007100255 Memorandum d order dismissing fitiiens Association for Sound
Energy appeal from unpublished ABLB 800616 prehearing
conference order rejecting contentions Interlocutory appeal
is not permitted unless petition is denied in entirety
BISHOP, C J Atomic Safety and Licensing Appeal Panel, BO/07/03
2pp
8Q0730Q366 Requests that missing pages from FSAfi Amends 1-10, listed in
encl.bc forwarded along w/any addl amends Also requests that
name be added to mailing lint Certificate of 9vc enc I
Related correspondence
ELLIS.J Citiiens Association for Sound Energy BO/07/07 3pp
B007310I23 First set of interrogatories directed to applicant Request!
details of signed sale negotiations Certificate of Svc oncl
Related correspondence
ELLIS, 0 Citljpns Association For Bound Energy 80/07/07 6pp
Q 0070 102 98 Foruards documents mistakenly omitted from Hirtlay
documents H/o end
HODQDBN.A P, Antitrust Division BO/03/07 Ip
8007310380 Reviews B 007 OS draft transmission BVC sstUemont Bar»Bm«nt.
Document found to bo unacceptable dun to provisions making
Austin jurisdictions! as practical matter for wheeling
"Postage stamp" uhoeling rate is not proper in TX
UALOUQK, R, C Austin, TX 00/07/10 2pp
0007190485 Bbatu* rept advising that absent change in DOJ pollcv
pDiition. uti 1 ulll not be able to reach settlement w/dept.
Differences ui/NRC re 1 leans* conditions not yet resolved.
Certificate of Bvc end
CRE6N. D 0 Houston Liohting fc Power Co » Dalier & Bottfl. *
LownnsteiniNeiuman.RBlBi Axulrad hToll BO/07/11 7pp
8007150431 Status rept on settlement negotiations Urges 6O-<U(j
suspension of proceedings, including hearing date, due to
continued negotiatloni u/Pultllc Util! Board of City of
BrounsvlllB- TX. H/Cortl flcato of Svc & pleading bafore FERC,
BTAHL>D M, Central & South West Corp 8TAHL, D H Isham- Lincoln li
BeaU, aO/07/11 Hipp
DOCKETED ITEMS
27J
OOO7130449 Status rept by Public Utlls Board of City of Brounsvi 1 1 e. TX
re settlement progress City would not object to further
•itenilun United to 30 days although negotiat 1 ons do nut
nppaar to be fruitful Certificate of Svc end
PDIRIEfl, H R Brnuinsville.TX POIRIER.M R Spiegel & McDtarinld
BO/07/11 6pp
9007150300 Third status rept an Battlement progress Suggests 30 -day min
intension to pursue nag oblations J< ta present proposed
license conditions re transmission svca t> other areas
Certificate of Svc end
CHANANIA, F D Antitrust Division BO/O7/11 Bpp
BOQ716062S Status rept re settlement neg uti ation progress Eipressea no
optimism for agreement u/DDJ but agreement u/MflC may bo
reached re license conditions dealing in/bulk power- yheeling
rates- Certi fi cate of Svc encl
8AMPLE3.M D , KMOTTS, J & Teias Utilities Generating Co
SAMPLES. H D Worshflm, Farmjthe & Samp ell BO/07/11 6pp
aOQ71703fa4 Status ropt re development of settlement discussions Urges
denial of add I extension of time due to belief that no
••ttlement mill be reached between DOJ & applicants
Certificate at Bvc oncl
CVPHGRT.B B Justic e, Dept of BO/O7/11 6pp
80071 703 BB Second status rapt re settlement negntiations pragre&B Urges
further antitrust settle-merit efforts to proceed apace u/FERC
settlement due to similarity of issues Certificate of Svc
•ncl
JOHN, D F Affiliation Unknown JQHNi D F Mud inaelac tri t
Cooperative, Inc JOHM. D F McDermott, Hi H (. Emery BQV07/1I 6pp
8007210455 Submits itfltus rept of settlement negotiations in Houston
Lighting & Pouer Co et al & TX Utilities Generating CD
Hod of joint okune-rship agreement drafts eiehanged
Certificate op Bvc end
8URCHETTE.W H , RITTB.F H Northcutt Ely BO/07/11 4pp
8007160947 Motion making renouial of DOJ B00521 motion to establish
trial b other procedural dates Suggests BOQ90B for trioft
t, BO 1004 for cDimnBnceroent DP evidentiary hearing Settlement
don not appear to be- possible Certificate of Svf Etitl
CYPHERT, B Q , PARMCNrER, F Justice, Dept of [30/07/14 bpp
BQ07220SOO Buggesta rncatiaSd oratl on of SOO3O7 discoverij order in light
of titaniive settlement negotiations subsequ-ent lu conducted
by all parties & counsel on BO 0403
MILLER. M E Atomic aafetij and Licensing Board Panel BO/07/1A. Ip
BOQ722039i Order dunying petitions for directed CRT ti F icati on U/D
prfjudlCB to retubrnisslon following ABLE! d et erminat i on
EIBHDP.C J Atomic Safety and Licensing Appeal Panel BO/07/ IB
2pp
BOO730D418 Mlthdraual of 770311 notice of appearance fi Fabrikant
r**pOTiaIble for all communications until Further notice
Certificate of Bvc Bnd
CYPHHflTjSE Justice, Dept of BO/O7/B3 4pp
8007260620 Drauis attention to tun pleadings that ihauld be treated
»ip.«r»t«lg although stapled togethgr I4F1C motion far
••tension of time & NUC/DQJ joint motion Par clarification d
•for establishment of prnduction schedule
CHANANIA.F D Antitrust DiviHipn BO/O7/H3 Ip
0007280427 Matiqn for eitension until BOO731 to file objections u/
proposed revision ta ABLD B00717 prehearing conference
ordtr b notice of final prphearing confoTcnce- Discussions. ia/
parties have commerced b must proceed
H Hesring Branch 3 GO/ 07/23 2pp
B007250441 Proposed corrBction to (J004O9 prehc-aring transcript
Certificate of Bvc end
CFCEN. D- 0 Houston Lighting !• Power Co * Baker & Dotts
Louenstun, Neuroan, RB xs. Aralr-fld !< Toll BQ/Q7/SS 5p p
0 IrvspettiOTi reports, IE Bulletins tt corr nspondcncE
aoQ7a9O32B ForuiaTds IE Info Notice BO-12, "Instrument Failure Causos
Opening at POFIV t. Blcjtk Valve " Mo specific attioti or
response nee ess -try
BEYFR1T.H V Region 1, Dallas. OfFici- of the Director BO/03/31
IP
B0071B0490 Discusses IE Inso Repts 5Q-445/SO-H fc 30-Hi/BO-ll on
BEIDLE.U C negion 1, Dallas, Reactnr Ctm&ti-ut 1 1011 ti Englnoerlng
BuppnTt Branch BO/0^/0-1? 2pp
— BO071BQ'!9'7 Notice of violation frnm intp nn £3(10404 Noncomp 1 ianc e
noted Failure to folium piping Installation procedures
* Region 4, Dallas, Office of the Director 60/04/09 Ip
aOD7240509 Foruiards IE Info Notice H0-31i "Anchorage (i Support of
BaFety-Flela ted Elettncal Equipmnnt " Mo written response
required
SEVFRITiK V Region 4, Dallas, Orfico of the Director 60/05/16
6007110239 Forwards IE Ins[i Flepta 50-')45/BO-l'; J, 50-446/00-14 on
BO0313-ld No noncomp Hance noted
BEIDLE.M C Region t, Dallas, Reactnr Construction & Engineering
Support Branch BO/05/P3 3pp
— BO071IO334 IE Insp flepta ao-443/0!l-14 f, 90-41d/HO-14 on BOOQ13-li No
ngntompl ianc-c notifd Major arum In-sppcted const attivitins.
RCPD piping work li other aaf sty-related piping work
OILDEUT, L D , MALI., FI E Region 4. Dallas, Reactor Construction &
Engineering Support DTanch CHDSBMrtH, W ft Region 4, Dallas,
Office of the Director BO f OS/ 33 4pp
8007030353 roruierils IE Inf-a Notice BQ-32. "Crs.ilcdoune In Contaml natinn
Contr-ol Prograina " No urttton response raquireil
BEVFHIT,H V Region 4, Dallas, Office of the Director BQ/05/2B
QOO7HI0351 Forwards IE Circular 00-13, "Qnd Strap Damage in
Hestinghouse Fuel Assemblies " No uintten ruaponso required
V Rcgl-on 4, Dallas, DPflte of the Director BO/05/S9
Bo070100ai Foruards IE Info Notice 80-23, "Loss of Suction to Emergency.
Feoduator Pumps " No uritten response required
SEYFRIT.K V Jlegion 4, Dallas. CJFflcfr at the lUrettor BO/Q3/27
IP
B00717OI96 Responds to IE Bulletin 00-0?, "Hijd fame. tor Actuatoi-
Deficiencies " Sis vetidars idetitlfieil as potential suppliers
op equipment containing ITT Qranural hLjdraaotor actuators
Vendors confirmed no actuators supplied to Facilities
OAHY.JZ J Tejiaa Utilities Benprating Co aO^Oi/10 Ip
H007220J2B Foruards IE InPo Nutice BO-2&. "Evaluation oF Contractor
OA Programs " No written response required
SEVFRIT.K V Region 4, Dallas. OFflc* at the Director BQ/QbflO
8007110592 Atk receipt n P 1C Inap Hepts 50-445/UO-13 (< 50-44J./BO-13
No proprie-tarij info-
&ARY.R J Tc<a5 Utilities (Itinerating Co BD/Ob/11 Ip
— B 0072 BO 636 Joint motion for clarification of ABLB 000716 memorandum
containing decision to reconsider AB(-D B00307 order ri
•ettlenent documents Moves for order establishing ichtdule
for production of settlement dorumentB H/CePt 1 Fiea te oP Bvc
FABRIKANT, R Justice, Dept of CHANANIA.F D , GLUME, M B
Antitrust Division 00/07/23 Gpp
8007300356 Order granting extension until 300731 For NRG to submit
objtctloni b prapo-sei] revlalnns to 800717 final prehearlng
eonferant* order
HOLFE, B J Atomic Safety and Licensing. Doarrf Panel BO/O7/E3. Ip,
M, Antltru»t hearing transcripts
9QO718Q008 Transcript of SOO-714 prehearing conference in Bethiadii,
HD rt settlement negotiations Pp 89 J -946
•« Atomic Safety and Licensing Board Panel, BO/07/14 7Bpp
B007160334 Forwards IE Info Notice B0-a7- "Degradation of Realtor
Coolant PUmp Studs " Ha specific action o-r roapon-ae
r»qtJlred
GEVFRIT.K V Region 4, Pallas. Office of the Director H0/0t,/!l
ip
Forwards IE InPo Hotlce QO-30. "Prompt departing of Info In
Accordance U/IOQFRSD 55te) " No written response required
SEYFRIT.K V ilegion -1, Dallas. Office tif- tho Director 80/06/13
B0071B0967 Forwards JE Insp Rpplt, bO-HS/BO-11 t, 90-41A/BO-1 1 In
Ani — Hay I960 Ha nnncompl lance notud
BEIDLE, W C Reginn 4, Dallas. Rcmc tor Construction ti Engineering
Support Branch aO/06,/17 3p p
280
— BO071BO5V4 IE In&p Rojits 50-145/130-! 1 *. 50-<146/U(J-U iti Apr-Mau 1980 No
nonconpl lane i> noted Major a'eas inspected saf ety-re lated
electrical installation !i protection uf major components
TAYLOR, I! G , CROSSHAIR W A Roqion 4, Dallas. Office Of the
Director BO/06/lfi IQjip
—8007210470 "Control Panel Schematic " Sheet S at B
* De Laval Turbine Inc 76/07/16 Ip
— 8007210496 "Control Panel Schematic " Sheet 3 of B
B De Laval Turbine Inc 76/07/16 Ip
B007140435 Ac k receipt a? 1C Insp Repts 50-443/60-14 '< S0"44fo/80-14 on
800523 Mo proprietary info
OARV.H J Tpias Utilities Generating Co BO/06/1D Ip
B007140497 Ac k roceipt of SOOfiOi. 1 tr informing NRC of steps token to
correct violations noted in IE Insp Repts 50— 14S/SO-13 !i
SEIDIE.U C Ftetjion 4. Dallas.
Support I]ranch SO/06/19 Ip
Construction
Engineering
— B007210SOO "Control Panel Schematic " Sheet 4 of B
» Do Laval Turbine Inc 76/O7/16 Ip
— 8007210504 "Control Panel Schematic " Sheet S of B
» Do Laval Turbine Inc 76/O7/16 Ip
— OOQ721O509 "Control Panel Schematic " Sheet 6 of B
* De Laval Turbine Inc 76/07/16 Ip
— U007140S02 Rescind--, to NfiC 1 tr . i
50-4fl5/aO-Ki *, 30-446/BO-13 Cnt
/inlat ions nnted In IE Insp Hepta
active actions ingt met
of stiict adherence to
apectfiod utpld procedure
GARV.fi J Tnias Utiliti
Renprating Co BO/Ot/O6 4pp
HQ0724OOS7 Forwards IE Circular 80-15, "Lnss of Reactor Coolant Pump
Coaling J, Natural Circulation CDoldmun " No uritten response
required
BEYFR1T.K V Reginn 4, Dallas, Office of the Director 80/06/20
IP
3007170633 Forwards IE Circular 80-14, "Radi u.ictive Contamination of
Plant Dpminerol i i ed Uatar Sys '< Flpsultant Internal
Contamination nf Per aonttel " No urilton rpspjnso required
SEVrRlT.H V Region A. Dallas. Office of the Director BO/06/24
— 80O72I0310 "Contrnl Panel Schematic " Sheet 7 of B
« De Laval Turbine Inc 76/07/16 Ip
—8007210514 "Control Panel Schematic " Sheet a of B
» Do Lavdl Turbine Inc 76/07/16 Ip
— 8007210317 "Interconnection Diagram " Sheet 1 of 3
# DB Laval TurhinD Inc 77/O4/OA Ip
— 8007210319 "Interconnection Diagram " Sheet 2 of 3
» De Laval Turbine Inc 77/04/06 Ip
— 8007210337 "Schematics Diesel Generator Local Panpl, " as-uuiJ*
* Oe Laval Turblnn Inc * delta Switchboard Co « Oibhs
Hill. Inc (aubn of Dravo Corp ) 76/07/16 !|i
300723O370' Foruards IE Bulletin 00-16, "Potential Mi s.iop 1 ication of
llaseinnunt Inc Mnfii'is 1151 "* i 1 !i2 Pressure TrariEfni tters
M/Elther A Qr D Output Codes " Written response required
IE Circular BO-IA also encl Nn uritten response required
SEYFDIT.k V Region 4, Dallds, Office uf tho Direttor BO/O6/a?
IP
B Reportable occurrein.es. LERs
related correBpondnnce
flO07210162 PfJS-IV-Bfl-OlO group of appm" tutlvr people
harassing secuntg forca OVIT period nf five days State &
local liiu en? ovrempnt authorities have bopn actively
supporting sacinitij forco
KELLY. J Region 4, Dallas, Office of the Director 80/07/O9 Ip
BD0721O3'52 Updates 900121 deficiency rcpt re il i screpanc i BS involving
installation fc ins-p requircmen*a for Class S non-nuclear
saf ety-relatuil piping suppoits FEAR is being revised final
rept uiill bP forwarded b u, 800922
GARV.H J Te(a3 Utilities Cem>rat hig Co BO/07/14 Ip
D NHC Orapt/Final Environmental StatementBi nuppln h corr»spondunc»
8007140033 Pi-ovidoii baclground info on scheduler content ti form uf
facilities OL gtage environ rovieiu for initiation of
appropriate NEPA rev i BUI & technical oversight functlonn List
of revieuers, revicy schedule (. UES nutllne encl
SCHWENCEH, A Licensing Qranch S 80/06/26 Bpp
F Security, mmlicalr enmrgencg tt tire protection plans
8007110576 Requests revisions b ad(!l info to safeguards contingency
plan re evaluation of util application for OL Forward!
statement uf NFtC positions Response should be lubmitted
within <bO daijs Statement withheld (ref 10CFR2 770)
aCHWENCER./i Liceneinp Branch 2 BO/06/S3 2pp
B0070B020S Advises that upyrndod emergencu plan far facility will b«
submitted by 900930
OAHV.R J TPIOI Utilities Genpratlng Co BO/Oi/30 Ip
DOCKET HO-446 COHflNrKC PEAI^ 9TEAM ELECTRIC 5TA .UNIT 3
ft flp|>I ication/cons truction staijB documonta a correspondence
SO 07030234 Advises of filing of dot.it led o lectrical , instrumentation b
control drauiingb *tibnntted by TX Utils Generating Co Action
taken in conf ormam: e m/NRC Prl Opuiiiting Procedure 209.
Reviainn 1 Drawings in Centr.il Filos only
DURWEUL.S Licensing llranrh 3 BO/Oh/06 Ip
B0072ri0001 Forwards •! tatenmnt of policy re requirements to Se met for
curiont OL apt 1 i c.it i uns. ja derived from NURei!-06fiO & found
tn NUREQ-0694
EI5EUHUT. D 0 Division nf Licensing 80/06/36 2pp
e0071BO3()6 Forwards FrecBe R Ni L Sol 9, Inc B006SO Itr in response to fiRC
800419 request For adifl info re Mondplaln mgt Response will
be IneorporatcJ into util environ rent
GrtRY.R J Texas Utilities Generating Co E10/0//10 3pp
0 Adjudicntory correspondence
6007310243 Foruards Commission 000327 memarandum (< nrder containing
declfiions on UCB 780502 petition for rHconildvratlon of
7B04ia memorandum & ordor UCB 771IO4 petition sought action
re fire protection for electrical cables
EI8ENHWT, D B Division of Licensing BO/06/23 B9pp
800709033? Exceptions to A&LB B00616 order rn B00430 pruhaarinfl
conferonee Order orred in rejecting intervennr Cnntentlonn
li 3,6lb) (0)1 S 81 10 & conditioning acceptance of
Contentions 5 & 21 Certificate of 3vd tncl
CLLIS.J Cltliens Association For Sound Energy 60/06/30 4pp
B007030246 nesponse in opposition to A9LB B00616 ordor ro B00430
prohearing conferencei ruling on admiHslbill ty of
contontlons Urgus mod of nrder to delete Contentions 3, 4i fi
11 6 17 Si to reword Contention 23 Certificate of Bvc and
REYNOLDS, N 5 . HORIN, W A To IBS Utilities Generating CD
REVNQLDB.N S Dobfvoiae 6 Liberman 80/07/01 t7pp
80072400-66 Summary of 000625 meeting bptueen Assintant Director for
Environ Technology & rtieistdnt Director for Licencing re
mgt. technical oversight fc mechanics of environ revioui
jiflr for niance
MULLEFl-DR Assistant Utrcctor for Environmental Technology
TEDGSCO.H I. Assistant Director for Licensing BO/07/14 4pp
S007100235 MemDrandum tt order dismissing CJtljens Association for Sound
Cnnrgy appeal from unpublished ABLB B00616 prehearlng
CDnference order rejecting contentions Interlocutory, appeal
Is not permitted unless petition is denied in entirety
BISHOP. C J Atomic Safety and Licencing Appeal Pansl BO/07/03,
B00731017B Foruiardi e-tec tricnl. instrumentation *i control drauiinga to
assist in plant review
CAHV. II J Teidi, Ubilitles 'Jenerating Co QO/07/15 3pp
— a00721O4B5 "Control Panel
* De Laval Turbine Inc
thematic " Sheet 1 of B
76/07/16 Ip
E)00730036b Requests that missing pages from TSAR Am*ndi l-10ilJ»t*d In
pnclibe fnruarded iilong w/any attrfl amends Also request! that
name lie added to mailing list Certificate of 8vc and
Related correspondence,
ELLIS, J Citnens Association for Sound Energy BO/07/07 Spf
281
B00731O13G First sot of Interrog.i tones directed
do tail I of lignod tale negotiations Pert i t-i c,i1-f
Related correspondence
ELLIS. J Citiiens Association for <Jound Ene-ruy
applicant Huu,uests
'ivc oncl
8007310167 Order affirming grant of addl time for Cituens Association
for Bound En«roy to respond tn applicant B007Q1 motion tt to
til* position re ASLB BOO&16 ardor Five-day on tension For
Citiiens for Fair Util Regulation re NUREO-ObV4 granted
BOHERHiE 3 Atonic Safotu. and Licensing loai-d Pannl BO/07/10
Spp
BQQ71702A1 Forwards NUREQ-0694. "TMI-Related Requirements Fnr NDUI OLs. '
ptr B0071Q lelcon Copies forwarded to Citiiens for Fair
Util Regulation I> Atsoclation of Community Organi lations For
Reform Now W/o encl
TURK,S E Heaving Branch t 90/07/11 Ip
BOO722Q346 Motion For reconsideration of ASLB BQ0430 ardor for
certification of denied contentions Maintains validity of
Contnnt inns. Btpoc ial ly Class V accident scenario Certificate
of Svc enc 1
ELLIS. J Cititens Association for Sound Energy BO/07/14 'Mpp
B00722O399 Suppl to intervenor BQ0714 motion for reconsideration or
certification of doniod contentions re ASLD 800430 order
Submits neui info in support of Contention 1 re State of TX
V* TX Utili companies Certificate of Svc end
ELLlBiJ Citizens Association for Sound Energy SO/07/14 7pp
BOO71B0437 Response in opposition to TX Association of Community
Organ! lationa for Deform Now £300701 /notion seeking
reconsideration of B006t<> order denying cetaln proposed
conttnttons Rewording must be denied H/Certif icato of Svc
REYNOLDBiN 5 , HORIN, W A Texas Utilities generating Co
REYNQLD3,N S DsbevoUe (< Libarman BO/07/lfi ICpp
B00723O741 Response in opposition to TX Association at Community
Organizations for Reform Now B00701 motion for
reconsideration of ASLO BO061& order Urges denial of
alternative motion for certification W/Certi f icate of Svi
TUflK-S E Hearing Branch 1 BO/07/31 24jip
BO07H3Q749 Response to applicants' 800701 objections re prBhearing
conference order (c to applicants' motion for mad Urges
denial of requests re Contentions 3. 4. 9. 17 & 33 Motion to
delate Contention It must be granted U/Certi f icatt of Svc
TURK, B E Haorlno Branch 1 80/07/21 IBpp
6007390799 Or dor extending time until BQQBOiJ for Commission ta rovieur
ALAB-S99
CHILK.S J Office of tde Secretary nf the Commission BO/O7/24
IP
BOO731Q328 Response to Citiiens Asaociation for Sound Energy 80O707
first aet of interrogatories & requests foi clarification
Explains communication u/public re electric utll matters
^/affidavit. Certificate of Svc & supporting documentation
REYNOLDS, N 8 , HDRIN.H A Teias Utilities Generating Co
REYNOLDS- N 8 DotievoiBO i> Liberman BD/O7/3B 36pp
M, Antitrust carreBpondnnce
&OO70 10347 Foruiards uork order eitending Hartley contract to BOO 331 W/o
and
DLUrte. H B Antitruat Division BO/04/14 Ip
G007150431 Status, root on settlement negotiations Urges 60-dag
suspension of proc Bed inga. Inc lud ing he-aring date, dim to
continued nogotiati oni u/Public Utils Board of City af
Brownsville, TX W/Csrti Ficate of Svc f, pleading haFoTe FEflC
BTAHL. D M Central !. South Nest Corp STflHL,. D M Isharoi Lincoln fc
Beolc QO/07/11 2tipp
B007150449 Status rept by Public Utils Banrd of Cita nf Broumsvi He, TX
re settlement progress City mould not abject to further
aitonsian limited to 30 day5 although naggtiatlons do not
appear to be fruitful Certificate of Svc end
POinlEH.H R nrnunsvillp, TV POIRlEft, M H Spiegel (. McDlarrtiid
HO/07/11 App
0007130^00 Third status rept on settlement progress Sugotjsts 30-day min
Gitonsion to pursue negotiation; l< to present propcseJ
license conditions re trnn^miss ion svc s >< other areas
Certificate of Svc encl
D Antitrust Division 00/O7/11 Qop
B00714O623 Status ropt re settlement neg tit iat ion progress Eipresses no
optimism foi agreement u/DOJ but agreement u/NRC may be
reached re license- conditions dealing uj/bulk poiijer uihoelinq
rates Curtificalt' of Svc encl
SAMPLES.M D , KNOTTB, J 11 TsiaB Utilities Oenerating CP
SAMPLE9,H D Uorsham. Forsythe d Sanpels QO/07/ 1 1 6p(i
B00/1703i4 Status i opt ve development of settlement discussions Urges
denial of addl extension of time due to belief that nu
settlement ulll be reached between DDJ & applicants
Certificate of Svc encl
CYPUEnT.<i D Justice. Dept of 80/07/11 6pp
B0071703BB Second status rept ro settlement negotiations progress Urgss
further antitrust settlement efforts to procepil apace u/FEFIC
settlement tfue to nimilarity uf Issues Certificate nf Svc
nncl
JOHN, D F Affiliation Unknouin JOHN, D F Mett inaeloc trie
Cooperative, Inc JOHN. 1) F lit Dei mott, Hi 1 1 ?. Emory BO/07/11 6pp
BOO731045'j Buliinits stntiis re|it of settlement negotiat ions in Houston
Lifjhtlno & Power Cn et al & TX Utilities Generating Co
Mod nf joint auincrihip ogrosmiint draftsi eichangod
Certificate of five one i
DUJ1CHETTE, U II , UlTT^i,!' H Northcutt Eli; 00/07/11 4pp
B007I60547 (lotion seeking vcnu'jaJ of DOJ 000531 motion to establish
trial 5 other procuduul dates Sjgyesti 300908 fnr briefs
d flOIOOA for (.ammenceifiont of ovlduntiarij hparinn Settlement
does not appear tn be possible Certificate of Svc encl
CYP!iniT,3 n , PARMENTtR.F Justice, Dept of HO/O7/14 fcpp
B00732O90O Suggests reinnsideratl on of QOO307 tfistoverij order in light
of entensive aeftlement negotiations aubsoquent lij conducteil
by all parties i< cuuntel on OOOlOa
MILLER, M C Atomic Safety and Licensing Buaril Panel QQ/Q7/1& Ip
B007220956 Order denying petitions for directc-i) c urtl f itati pn ui/o
prejudice to resubmi scion follnuiing ASLD determination
BISHOP, C J Atomic Safety anil Licensing Appeal Panel SO/07/1B
2pp
B00730041B Uithdraiu.il of 790111 notice of appearanLB R Fabi ikant
responsible for all cnmmunications until further notice
Cortiflcate of Svc end
CVPHCHTiS B Justice, Uopt of 00/07/33 flji p
BOO701Q2A4 Foruisrila aianetl stipulation abiding by ASLD 800331
protwctivs order re Houston Ligliting & Poiuer corporate
itudy H/o end
BLUKE, M B Antitrust Division BO/O4/14 Ip
11007^110620 Draws attention to tuo pleadings that sho-ulil Uo treated
separately although stapled toy ether NltC motion For
Bitennlnn of time !< N»C/DDJ joint motion For clarification tt
For estab 1 ishmenl of production scheuule
THANANIA.r D Antitrust Division BO/O7/ES Ip
ODO7O10379 Forward! documents mistakenly omitted from Hartley
documants W/o encl
HatWDON,A P Antitrust Division BO/03/07 Ip
BOO72103HB ReviBius B0070? draft tranamiBBlan svc tattlBment agreement
Document Found to be unacceptable due to provisions making
Austin jurlsdictional as practical matter for wheeling
"Paitage stamp" wheeling rate is not proper in TX
BALOUOH. R C Austin, TX BO/07/10 app
BM7190435 Status rept advising that absent change In DDJ policy
position, uti 1 will not be able to reach settlement u/dept
Dif f eronoi u/NRC re license conditions not uot resolved
Certificate of Svc and
OREENi D, 0, Houston Lighting h Poiuor Co * Qatar b Qotts *
Louen»t«in,NflUmHn.RBis, Axelrad t Toll BO/07/11 7pp
B0072GQ627 Motion for eitonsion until SOO731 to File objections in/
proposed revision to ASLB B00717 prehearing conference
order !< notice of final preliearing conference Discuss i une u/
parties have commenced b must proceed
LEWIS, S H Hearing Branch S HO/07/35 Spp
— 3007380636 Joint motion for c lari deal ion of ASLD QO0716 memorandum
containing decision to reconsider ASI.D B00107 order re
settlement documents Moves for order estob 1 tailing schedule
for production of settlement documentb U/Certi f icats of Svc
FABHIKANT.R Justice. Dept of CHANftnlA, F D . 3LUHE, H D
Antitrust Division BO/07/25 Bpp
B007300356 Order granting extension until BOO?!! (or NUC to submit
objEctlons !t prnposeil revisions to BOO/17 Final prehearing
conference order
WOLFE, S J Atomic Snfety and Licensing Board Panel HO/07/2S Ip
282
N Antitrust hearing transcripts
BO07iaoOOa Transcript of B007I4 pruhearing conference in Bethesda,
Ml> re settlement negotiations Pp 071-9-J6
* Atomic Safety and Licensing Hoard Panol 00/07/11 79pp
B00733O441 Proposed correction to BQ0409 prBhearing transcript
Certificate of Bve end
OREEN, D & Houston Lighting !. Pouer Co * Baiter t, Dotts *
Louonstcin, Newman, Rel E. Aielrad (. Toll BO/07/SB 3pp
80071B0967 Forwards IE Insp Repts SO-443/QQ-1 1 fc SQ-446/BO-11 in
Apr-Hay 1780 No noncomp Hance noted
BEIDLE.H C Region 4, Dallas. Reactor Construction fc Enfl ttioarl
Support Branch BO/06/17 2oo
—8007180574 IE Insp Repts 50-145/80-11 fe 30 -44 6 /BO- 1 1 In Aer-ftalJ
n oncompliance noted Major areas inspected caf ety-relatpd
pipe b equipment installation, concrete repair actlvition,
electrical Installation (. protection of *>Bjor components
TAYLOR, R 0 , CROS9MAN.U A Region 4. Dallas, Dffico Bf tha
Director BO/06/16 lOpP
Inspection report;, IE Bulletins !< correspondence
8007230335 Foruiarda IE Info Notice 00-12, "Instrument Failure Causes
Opening of PCJRV t« Block Valve " Ho specific action or
response necessary
SEYFRJT,K V Region 4. Dallas, Office of the Director 80/03/31
IP
BOO71Bufl9O Discusses IE InEp Repts SO-443/BO-11 b 30-446/80-11 on
BOO4O4 t, foruinrds notice of violation
BEIDLGiW C Region 4. Dallas, Reactor Construction b Engineering
Support Branch BO/04/Q9 2pp
— fl'007180499 Notice of violation from tnsp on B00404 Noncompl iance
noted Failure to follow piping installation procedures
• RED. ion 4. Dallas. Office of the Director 80/04/09 lp
5007340309 Forwards IE Info Notice BO-21. "Anchorage fc Support of
Bafetg-Relat-eii Electrical Equipment " No written response
required
SEYFRIT, K V Raglan 4. Dallas, Office of the Director BO/05/ 16
lp
B00711O229 Forwards IE Insp Repts SO-445/BO-14 (. 5Q-446/BO-14 on
BOO 9 13- 14 No noncorapllance noted
SElDLEiW C Region 4, Dallas, Reactor Construction b Engineering
Support Branch HO/03/23 Spp
—80071 10234 IE Insp Ropta 50-445/80-14 & 50-446/80-14 on 800313-li No
noncomp 1 lance noted Major areas inspected const activities,
RCPH piping uiork b other safetu-related piping work,
eiLBERT.L D . HALL.R E Region 4. Dallas, Reactor Construction I>
Engineering Support Branch GROSSMAN, W A Region 4, Dallaa,
Office of the Director 80/O5/23 4pp
80070302S3 Foruarda IE Infa Notice 80-32, "Breakdowns In Contamination
Control Programs " No written response required
BEYFRIT.K V Region 4, Dallas, Office of the Director 80/03/30
BOQ7210351 Forwards IE Circular BO- 13, "Grid Strap Damage In
Ue-itinghnuse Fuel Assemblies " No urltten respDnse rettulred
SEVFR1T, K V Region 4, Dallas. Office of the Director DO/OS/20
8007010026 Foruarils IE Info Notice BO-23. "Loss of Suction to Emergencg
Feeduiater Pumps " No written response required
HEYFR1T.K. V Region 4, Dallas, Office of the Director. 00/OB/a1?
lp
8007170196 Respond* to IE Bulletin 80-09, "HgdramotoP Actuator
Deficiencies " Bit vendors identified as potential suppliers
of equipment cantaining ITT Gen oral hgdramotor actuators
Vendnro confirmed no sctuatorii supplied to facilities
BARY.R J Teiaa Utilities oeneratlng Co SO/06/ 10 lp
B0072S013Q foruiBTds IE Info Notice 80-26, "Evaluation of Contractor
QA Programs " No urttten response required
BEVFRIT, K V Region -t, Dallas, Office of the Director flO/06/10,
lp.
ReptB SO-44S/80-13 t< 50-446/80-13
" " '11. lp
0007140433 Ac k receipt of IE Insp Ftepts 3O-443/SO-14 fc 9O~44A/eO*-»4 ot
800923 No proprietary info
OARY.R J Teias Utilities Generating Co BO/06/1S tp.
0007140497 Acli receipt of SOOAOfi Itr informing NRC of itapa ia&on t«
correct violations noted In IE Imp Repti 3O-443/flO-13 ft
SO-44i/HO-13
SEIDLE, H C Region 4, Dallas, Reactor Cotl* true t ion Bi enginBffpinB
Support Branch BO/OA/19 lp
— B007140S05 Responds to NRC Itr re violation! noted In IE Inap Roots
50-443/60-13 & 90-44&/80-13 Corrective actions, aat Mt
w/welders to reaffirei importance of strict adhBrvnco to
specified u*Id procedures,
OARV.R J Tunas Utilities Generating CD 8O/O&/0& 4pp
0007840057 Forwards IE Circular 80-19, "Lo»t of Raactor Coolant fuaf
Cooling !i Natural Circulation CooldOMn " No Mi-ltten raamonit
required
BEVFRITiK V Region 4. Dall*s, Office of the Diractor SO/O4/flO.
8007170603 Forward e IE Circular 80-14. 'Radloactlv* ContonlnBtlon of
Plant Deminerallied Mattr Bg* t Resultant Intarnal
Contamination of Personnel " No written reipon>» required
BEVFRIT- K,V Region 4, Dallaa, Office of the Director 80/04/04
8007830370 Forwards IE Bulletin 80-16, "Potential Hliapplltatlon of
Rotemount Inc Models 1131 & 1153 Pressure Tranittltteri
H/Either A or D Output Codes " Written ratponie raqulred,
IE Circular 00-14 also end No uritten respon«e rBquired,
BEVFRIT.K V Region 4, Dallas, Office of th« Director. BO/Ofi/27
8 Reportable occurrencesj LER* Ic related corrtipondencft
80070B0062 Final deflci«ncij rept re Unit S reactor v»"«*l outlet
nonles u/short safe-ends Invvitlgation det*r«in»rf that
matter not reportable per lOCFSBO 99<e) Bupportlnfl record*
available at site
OAfiV, R. J Texas Utilities Generating Co BO/O6/26 lp.
0007310162 PNS-IV-BO-010 group of approv twelve peopla
harassing security force over period of fiv* day*. State li
local laui enforcement authorities have b»«n activalg
•upportlno lecuritg force.
KELLY, J Region 4, Dallas, Of flea of the Director 80/07/09, lp
B0072103S2 Updates 000431 deficiency rept r* dlicrep«nclei Involving
Initallatlon fc Insp requirements for Class 3 non-nuclear
•afetg-related piping tupportn FSAB ii being revised Final
rapt ulll he forwarded bg 800923
OARV.R, J Texas Utilltli* Oenerating Co SO/07/14 If
DOCKET 30-448 DDUOLAS POINT NUCLErtR STATION- UNIT 1
A Application/construe tion stage documents & correspondent*
B007330001 For war 1)9 Btattmant of policg re requirements to be Met for
current OL applications' as derived from NUHEO-066O *t found
in NUREC-0694
EISENHUT, D O Division of Licencing 80/06/8& 2pp
tor. BO/06/11
I//«=TUW/ i-nruards IE Info Notice 00-28, "Prompt Reporting of Info In
Accordance H/10CFR50 55(a) " No written response required
SEYFRIT'X V Region 4i Dallas, Office of the Director BO/06/13
If
DOCKET 30-449 DDUOLA8 POINT NUCLEAR STATION- IWIT S
A Application/construction stage documents & correspondence
BQ07330001 Forwards statement of policy re requirement! to Be met for
current OL application*' as derived from NUREQ-06&0 t< found
in NUREQ-0694
EIBENHUT, D 0 Division of Licensing 00/0&/86 Spp,
DOCKETED ITEMS
283
DOCKET 3Q-452 OREENHOOD ENERGY CENTER, UNIT 2
A Applicati«m/con»truction stage documents & correipondence
8OO723OO01 Forward* statement of policy re requirements to bo met far
currant DL application", at derived from NUREO-0660 fr found
in HUREO-OA94
EIBENHUT, D 0. Division of Licensing 80/06/26 2pp
0, Adjudicator^ correspondence
B007OQOOO8 Motion to compel withdrawal of application due to
unwarranted delay* Requests rules Si regulations that will
govern proceeding tc nece**ar(| funds to retain legal counsel
Certlflcat* of Svc and
ABPEROEft.R 0 Cltiieti* for Energy fc Emplagnent, SO/06/02 4pp,
B007QW297 Forward* Conc*rnad Citlien* for Employment E, Energy BOOA02
notion to compel withdrawal of application li NRC response, to
ABU) far appropriate action
CHILR, 3 J. Office of the Soeretary of the Commission BO/07/03
B60714O370 Forwards request for withdrawal of application urging
termination of proceeding u/o prejudice It xtenilon of time
to raapand to Citiien* for Employment fc Energy motion,
VOieTiH H LeBoeuf. Lamb, Lelbg & HacRae BO/07/09 2pp
—4007140378 Request for withdrawal of 730404 application w/a prejudice
to futur* right*. Urge* continuation of withholding
confidential document* from public disclosure or to be
notlfiad of contrary determination. Certificate of Svc encl
VQIOT.H H Detroit Edison Co VOI8T, M H LeDoeuf, UBnb, Loibu, tr
HacRai. BO/07/09 4pp.
00O71S0929 Forwards response to NF!C B00421 request for info re masonrij
wall design Further review of masonry mall design is being
conducted at LaSalle to complete response to IE Bulletin
30-11 Package at 231 oversue drawings encl
PEOPLES, D L Commonuiftalth Edison Co 80/07/03 23pp
— BQ0715OS37 Package of 231 concrete masonry wall drawings tn be recalled
at later oate for microfilming
* Sargont & Lundy, Inc BO/O7/OB 231 pp
F Security, medical, emergency t, fire protection plans
8007010347 Forwards safeguards contingency plan amend Plan withhold
Iref 10CFR2 790)
PEOPLES.D u Commoniuealth Edison Co 80/06/27 Ip
O Adjudlcatary correspondent!
8007310243 Forwards Commission 800537 memorandum & order- containing
decisions an UCS 7B0502 petition for reconsideration of
78O413 memnranduni & order UCS 771104 petition sought action
re fire protection for electrical cables
EIBENHUT.D 0 Division of Licensing BO/Q6/25 B<7pp
K Utility Final Safety Analysis Report <F9AF1) fc Bmends
B00702040B Foruarda Amend 26 to FSflR
NAUOHTON, H F Commonueal th Edison Co BO/Oii/37 3pp
— B007020flSO Amend 36 to FSARi containing portion of responses to OA
Branch ti Reactor Sys Branch adill Pirs-t round questions
* Commonuiealth Edison Co 80/06/30 20Dpp
DOCKET SO-493 4REENWOOD ENEROV CENTER. UNIT 3
ft. Application/construction Btage dccumentt & correspondence
Porwardt itatement of policy re requirement* to be met far
currant DL application*! ai derived from NUREO-0660 (c found
in NUREO-0694.
EISEHHUT.DO, Divlilon of Llcenilng. BO/06/26 2pp.
0, Adjudicator^ carreapondence
BQO708OOOB Notion to compel withdrawal of application due to
unwarranted dtlnyi Requoiti rulii li rrgulatloni that will
govarn praceeding & necenaru fundi to retain legal counsel
Cvrtlflcat* of Svc encl.
ABPEROER.R 0 Cltlien* for Envrgu t. Employmont BO/04/02 4pp
D007090897 Foruardn Concerned Citijena for Emplogmint ti Enirgy B00602
Button to compel withdrawal of application b NFtC response! to
ASLB far approprlat* action
CMILK.S J Office of th« Secretaru of the Co»ml»«lon BO/07/03
I".
8007140370 Forward* request for withdrawal of application urglno
termination of praceeding w/o prejudice fc citiniian of tine
to re i pond to Cltlien* far Employment & Energy motion
VQIOT.H H LeBoeuf, Lttna, Leiby k MacRae 80/07/09 Spp
•—Q007140370 finquflit for withdrawal of 730604 application w/a prejudice
to future rights Urges continuation of withholding
confidential document:* from public dliclosure or to be
notified of contrary determination Certificate of Bvc encl
VOIOT.H H, Detroit Edison Co VOIOT.H H LeDosuf. Lamb. Leibv b
KacRaa, fl 0/07/09, 4pp.
DOCKET 50-4S4 BYRON STATION, UNIT 1
A, App II cat Ion/construct ion *tage document* h correipondence
9007010411 Forward s documentation of saf ety-rilated electrical
equipment qualification Addreesnt NRC Qiientlons 40 01 t
40, 77. Request* NRC approval of re»pon*e format prior to
Incorporation into F6AR
NAUOHTON.U e Commanuealth Edison Co 80/06/33. Stpp
B0070BOa?9 FortJardB 800630 affidavit certifying distribution of FSAH
ftmeni) Hi
NAUOHTON-W F Commonwealth Edison Co BO/D6/30 2pp
B0071609S9 Foruiards oddl FSAR drawings t< info for auiillary d
containment bldg structures & component a, in response tc NRC
B00616 ttr
NAUQHTON,W F Commonuieal th Edison Co BO/07/03 107pp
— 8007160S66 "Transient Thermal Analysis of Reactor Bldg Dome filns
Saetion "
» Sargent E> Lundy, Jnc 75/09/22 74pp
— B007160S69 "Thermal Transient Analysis of Reactor Dldg Structural
Section! "
WHITE, d 0 - KHflFlANA, 3 B Sargent t- Lundy, Inc 7WO3/05 77pp
— 800716037'! Packago of 182 structural drawings to be recalled at later
date For microfilming
» Sargent & Lundy, Inc BO/03/31 1B2
8007290678 Forwards drawings listed in FSAR, Subsection 1 7, per NRC
request
NAUQHTQN.U F Commonweal th Edison Co BO/07/07 Ip
— Q0072906B7 Package of 63 drawings to be recalled at later date for
filming
» Hestinghouae Electric Corp 7H/OB/O4 63pp
B007140320 Forwards Amend 57 to FBAR, amend Ing application for CPs b
DUB
NAUOHTON, H F Commonuealth Cdison Co 80/07/11 2pp
— B00714033B Amend 37 to F9AR, amending application for CPi b OLi Consists
of rospanses to aditl first round Quest ions 421 6—131 IB,
inadvertently omitted from Amend 26
* Commonweal th Ed i eon Co BO/07/31 14pp
30072203-10 Forwards affidavit stating that distribution of facility
FSAR, Amend 27 has bean made per Enel 1 to R8 Boyd 791039 Itr
to C Reed
NAUQHTQN,H F, Commonwealth Edi»on Co BO/07/li, Spp
Inspection reports, IE Bulletins b tori'espondence
B007B3O001 Forwards statement of policy re requirement* to be met for
currant OL application*! at derived from NUREO-OifiO ti found
in NUflEO-0694
tsISEHHUTiD 0 Divlilon of Licenilng BO/ 06/24 2pp.
0007210356 Fovwarrfs IE Circular BO-13. "Grid Strop Damage In
Hestlnghouse Fuel Assamhlica " No urilten response required
KEPPLER.J 0 Region 3, Chicago, Office of the Director BO/09/HB
IP
284
0007010006 Forwards IE Info Notice BO-23, "Loss of Suction to Emergency
Feediuater Pumps " No written response required
KEPPLEfl.J 1 Region 3, Chicago, Office of tbe Director 00/05/3'?
8OQ702O050 Forwards responses to IE Bulletin 80-05- "Vacuum Condition
Resulting in Damage to Chemical Vol Control SyS (CVCS)
Holdup Tanks " Three Zion holdup tanks can be valued to
contain primary sy*> water Positive pressure is maintained
PEOPLES, D L CorFHnnnuealth Edison Co BO/06/04 3pp
B00713Q113 Forwards IE Insp Repts 50-434/SQ-OB t, 5Q-4S5/8Q-O7 on
BOO 50 8-0? Ho noncompliancD noted
FIOflELLIiG Region 3, Chicago, Reactor Construe t ion ti Engineering
Support Branch QO/06/06 Spp
— 3007190110 IE Insp Repts 50— )54/60-OB & 50-455/BQ-07 on SOOSOB-09 No
none omp 1 iancc noted Major areas inspected licensee action on
previous Insp findings re employ Be qualification tt
certification t, concrete coating thickness
WILLIAMS C C . JDNES.C E Region 3, Chicago, Office of th*
Director BO/04/D5 3pp
800723O196 Forwards IE Info Notice 80-26, "Evaluation of Contractor
DA Programs " No written response required
KEPPLEJ1.J O Region 3. Chicago, Office of the Director BO/06/10
IP
Forwards IE Info Notice BO-27. "Degradation of Reactor
Coolant Pump Studs " No specific action or response
required
KEPPLER.J Q Region 3, Chicago, Office of the Director BO/06/I1
BQO72BQ7O9 Foruards IE Info* Notice 00-28, "Prompt Reporting of Info in
Accordance W/IOCFR5Q 35(e) " No written response required
KEPPLER.J 0 Region 3, Chicago. Office of tha Director BO/06/13
BO07100004 Forwards response' to IE Bulletin BO-09, "Hydramotor Actuator
Def ic lent lea. " Ho saf etij-i-elated sys or component at
Dresden 2 fc 3 uses AH-90 or NH-90 series hydramDtor
actuators
PEOPLEB.D L Commonwealth Edison Co BQ/06/16 3pp
0007030509 Faruards IE Circular BO-15, "Loss of Reactor Coolant Pump
Cooling *• natural Circulation Cooldoun " No written response
roqui red
KEPPLEfliJO Region 3, Chicago, Office of the Director 80/06/20
B00717Q4-3Q Forwards IE Circular 80-14, "Radioactive Contamination of
Plant pemin&raliied Water Sys l< Resultant Internal
Contamination Df Personnel " No written response required
KEPPUEH.JQ Region 3. Chicago, Office of tho Director 00/06/24
S Ruportable occurrences. LER* ti related correspondence
B007O2O63I Interim deficiency rept re Failure of po*t-tonilanl<tg}
anchorheads Generally concurs ui/INHYCO 80033O rept All
Category D heat treat loti will be tested Replacement
anchorheads From accepted heat treat loti ulll b* Initallflil
NAUOHTON-W F Commonuifllth Edi*pn Co BO/0&/B7 Spp
B007290061 Concurs u/anchorhead Evaluation b acceptance plan pTCpaBOd
in 800627 final deficiency rapt Implementation ulll B»
examined during future Imps
KEPPLER.J O Region 3. Chicago, Office of the Director. ©0/07/10
Spp
8007SQ0670 Deficiency rept re Intirnittent contact op oration of'M-d
switch Utll uill not ispliwont interim fix unleia no
permanent solution It BV*ilabl» prior to fual loud Iftll
will monitor Uestlnghouse rBCDiMiBndiitioni.
NAUOHTDtJ,U F Cammonueolth Ediion Co BO/07/ 33, Off
DOCKET 3Q-43S BYRDN STATION, UNIT S
A Application/construction itage documants ti corra'pondlmcB
8DD7010411 Forwards docuBantatlon of iaf»t«-r»l»ttd vlactrlcal
equipment q.ualif iration Addresses NRC Oucttioni 40 01 tt
40 77 Requests NRC approval of raiponaa forowt prior to
incorporation into FEAR
NAUOHTON, H F ComMDnwealth Ediion Co flO/Oft/nS aipp
8007330001 Forward i statimint of policv re requironnntn to ha not P
currant OL applicatlonsi as derived from NUREO-06AO fc found
In N(JREO-Oi94
EISENHUT.D O Dlvinion of Llcenilng. BO/O6/26. 9>p .
8007130529 Forwards response to NRG 8O0421 riquait far info ra oano
wall design Further review of maionru w*ll de*ign !• being
conducted at LaBalle to complete reipon«e to IE BullBtln
00-11 Package of 231 oversii* drawing* end
PEOPLES, D L ComnonuiBBlth Edison Co SO/07/08 23pp.
— 0007150337 Package of 231 concrete m*Bonru, wall drBwlnga to tta ra
at later datn far microfilming
• Sargent & Lundu. Inc 80/07/08, 231pp
F Becurltyi medical. eniBrgencu t< flra prottction plane
B007010347 Forwards safeguBrdi contingnncu plan amend Plan Withheld
(ref 10CFR2 790),
PEOPLES, D.L Commonuealth Ed It an CD BO/06/ 87 lp.
0 Ad judicatnry correspondence
B007aOOiaa Forwards IE Insp Repts SO-1S4/BO-1 1 t, 30-435/80-10 on
8 006 13 No noncompliance noted
FtORELLI.G Region 3i Chicago, Reactor Construction ti Engineering
Support Branch BO/Q6/23 2pp
Q007310S43 Por wards Commission 1300527 memorandum « order containing
decisions on UCS 700902 petition for reconsideration of
7Q0413 memorandum & order UCS 771104 petition sought action
re fire protection for alectrical cables,
EIBENHUT,D 0 Division of Licensing BO/06/29 QVpf
— BO0730OI43 IE Insp Repts 90-434/80-11 & SO-43S/BO-10 on B00613 No
nonco-mp 1 lante noted Major areas inspected results of
investigation into cause of mat! failure of containment
post-tension sys anchor heads fc corrective actions planned
OALLAQHEHjE J , KANKLIN, J E Region 3, Chicago, Office of the
Director HAVEB. D W Region 3. Chicago, Reactor Construction fc
Enginoering Support GrancJi 80/04/33 3pp
80O7S30aB9 Foruarils IE Bulletin BO-1A. "Potential Ml aanp 1 ication of
RoBBmount Inc Models 1131 EC 1152 Pressure Transmitters
M/Eithcr ft or D Output Code* " Written rasponse required
IE Circular 60-16 also oncl No written response required
KEPPLER.J Q Region 3. Clutago, Office of the Director BO/Q6/S7
K Utility Final Safety Analy«is Report (FSAR) fc amendfl
B00702040B Forwards Amend 26 to F8AR
NAUOHTDN.M F Commonuiealth Edison Co BO/ 04/27 9pp
--3007020420 Amend Si> to PSAR, containing purtlan of rvspon*** to DM
Branch ti Reactor Sys Branch addl first round question*,
* Cnfflnonuealtn Edison Co 00/06/30 2QQpp
6007080399 Forwards 800630 affidavit certifying distribution of FSAR
Amend 3b
NAUdHTaN.wr Commonwealth Edison Co 80/06/30 Spp.
BOO7250638 Fmruiarni response *o IE Bulletin BO-OB, "Eiaminatlon of
Containment Liner Penetration Welds " Dresden Unit 1 designs
will be reviewed & feusl&UJty of performing radiographie
BS animations will be aasesised hefore unit returned to svc
PEOPLES- D L Cnm^ionwealtli Edison Co BO/07/09 7pp
60O7230467 Submits supplemontal response to IE Bulletin 00-09,
"Hydramotor Actuator Deficiencies " Util review remains
incomplete duo to necessity of consulting equipment
suppliers Response uill be submitted fay 300629
PEOPLES-" L Commonwealth Erflson Co QO/07/1S lp
S007160359 Forwards aridl FSAR drawings fc info for auxiliary *
containment bldg structures 8. components! in raiponse to MIC
BOOS14 Itr
NrtUGHTDN,W F Commonueal th Ellison Co BO/07/03. 107pp
— B0071i>05i6 "Transionfc Thermal Analysis of Reactor Dldg Dornu Ring
Section "
* Saroent & Lundiji Inc 79/09/aB, 7<lpp.
— BQQ7140369 "Thermal Transient Analysis of Reactor Bldfl Structural
Sections "
WHITE, J 0 - KHARANA, S B Sargent i Uundy. Inc 79/OS/09. 77PP
DOCKETED ITEMS
285
— 8O07160374 Package of 103 structural drawings to be retailed at later
date for microfilming
• Sargent & Lundij. Inc BO/O3/31 1B2
80O729067B Forwards drawings listed in FBAR, Subaect ion 1 7, per NRC
r«qu»at
NA1KJHTUN.M F Commonwealth Edison Co BO/07/07 tp
— 0007290687 Package of A3 drawings to be recalled at later date for
filming
* UBEt ing house Electric Corp 73/QB/O4 63pp
H00730013B Forwards IE Insp Repts 50-451/60-11 & 50-455/HO-1Q on
H00613 No noncompl lance noted
FIORELL1.G Region 3, Chicago, Reacti.r Construction ti Engineering
Support Branch QO/06/25 2pp
— BO0730O143 IS Insp Jlepts 90— )b4/80-ll t. 50-455/30-1O on B00613 Ha
noncnrop 1 lane e noted Major arpat. inspected results of
investigation into cause of niatl failure of containment
post-tension sya anchor heads '< corrective actions planned
GALLAGHER,!: J , KANKLIN, J E Region 3, Chicago. Office of the
Director HAYCS, D W Region 1. Chicago, Reartor Construction t
Engineering Support Branch aO/Ob/21 3pp
BO0714032O Forwards Amend 27 to FBAR, amend ing application for CPs fi
OLi
NAUCHTON.W F Commonwealth Edison Co BO/07/11 2pp
— SO0714O338 Amend 27 to FBAR. amending application for CPs tt OLs Consist"
of responses to addl first round Questions 421 6~fl2l 10i
inadvertently omitted from Amend 56
• Commonweal th Edison Co 0O/07/3I 14pp
BQO7320S40 Forward* affidavit stating that distribution of facility
F8AR. Amend 27 has been made per End 1 to R9 Dogd 791029 Itr
to C Reed
NAltQHTDN.W F Commonweal th Edlsnn Co 80/07/16 2pp
0, Inspection reports- IE Bulletins & correspond once
6007210336 Forwards IE Circular 00-13, "Grid Strap Damage in
Hestinghouse Fuel Assemblies " No uiritton response required
K6PPLEH.J 0 Region 3, Chicago- Office of the Director 80/05/28
80072302B9 Forwards IE Bulletin 00-16, "Potential Misapplication of
Roseroount Inc Models 1151 E. H&S Pressure Trdnsmi cters
W/Either A or D Output Codec " Written reeponse required
IE Circular BO-16 also end No written response requireiJ
KEPPLER.J G Region 3, Chicago, Office of the Birector BO/Q6/27
B00725063B Forwards response to IE Bulletin 80-03, "Eiami nation of
Containment Liner Penetration Welds " Dresden Unit 1 designs
uill be reviewed & feasibility of performing radiographic
eiaminations will be assessed before unit returned to svc
PEOPLE3.D U Commonwealth Edison Co BO/07/09 7pp
8007250467 Submits supplemental response to IE Bulletin BO-09,
"Hydramotur Actuator Deficiencies " Util review remains
incomplete due to necessity of consulting equipment
suppliers Response will be submitted bij BOOBS?
PEOPLES, D L Commonwealth Edison Co BO/07/19 lp
8 nepnrtable octurrences. LERs t< related correspondoncf
8007010006 Forwards IE Info Notice 00-33, "Loss of Suction to Emergency
Favduater Pumps " No written response required
KEPPLGft.J O Region 3, Chicaflo. Office of the Director BO/03/29
B007020631 Interim deficiency rept re failure of post-tens! oning
anchorheads Oenerally concurs w/IHRYCO BOOS30 ropt All
Category B heat treat lots uiill be tested Replacement
anchorheads from accepted heat treat lots will be installed
NAUOHTON.U F CommpniUBaltb Edison Co BO/Ot/27 3pp
BOO70300SO Toruardl response to IE Bulletin BO-03, "Vacuum Condition
Rasulting In Damage to Chemical Vol Control Sy» (CVCSt
Holdup Tankn " Three Zion holdup tanfcs can be vslvoil to
contain primari| sys water Positive pressure is maintained
PEOPLES. D L Commonwealth Edison Co 80/06/04 3pp
3007370041 Concurs LJ/anchorhead evaluation !i acceptance plan proposed
in 300637 final deficiency rept Implementation will be
examined during future insps
KEPP1-EH.J 0 Region 3, Chicago, Office of the Directnr dO/O7/18
Hpp
8007130113 Forwards IE Insp flnpts 30-494/BO-OB t. 50-49S/BO-07 on
000508-09 No noncompl lance noted
FIORELLI.Q Region 3, Chicago, Fleactar Construction t< Engineertng
Support Branch 80/06/06 2pp
--8007190118 IE Inap f?epts 30-434/aO-OS t. 50-455/80-07 on B005OD-09 No
noncompliance noted Major areas inspected licensee action on
previous Insp findings re employee qualification tt
certification & concrete coating thickness
WILLIAMS C C , JONES.C E Region 3. Chicago, Office oF the
Director BO/06/03 3pp
8007220156 Forwards IE Info Notice 8O-36, "Evaluation Of Contractor
QA Programs " No written response required
KEPPLER,J 0 Region 3. Chicago. Office of the Director BO/06/1O
0007280670 Deficiency rept re Inturmi ttent contact operation of U-2
switch Util will not implement interim fn unless no
permanent solution is available prior to Fuel )uad Util
will mnnitor tlustinghouse recommendations
NAUQHTON.W F Commonwealth Edlion Co 20/07/23 3pp
DOCKET 50-456 DDAIDWOOD STATION, UNIT 1
A Application/construction stage documents & correspondence
B007010411 Forwards documentation of safety-related electrical
equipment qualification Addrcscos NRC nutations 40 Dl ?<
40 77 Requests NRC approval of response formnt prior to
Incorporation into FEAR
NAUQHTON,W F Commonwealth Edison Co BO/O6/29 aipp
BOQ7160163 Forwards IE Info Notice 90-37, "Degradation of Reactor
Coolant Pump Studs " No specific action or response
required
KEPPLER.J 0 Region 3, Chicago, Office Df the Director BO/06/11
8007330001 Forwards statement of pulley re requirements to be mot For
current OL appl icatlons, as derived from NUHEG-OftdO ti found
in NUREO-0694
EISEWHUT.D G Division of Licensing BO/Q6/S6 2pp
B007280709 Forwards IE Info Notice BO-2B, "Prompt Reporting of Info In
Accordance W/IOCFR'SO 55(e) " No written response required
KEPPLER'J Q Region 3, Chicago, Office of the Director BO/06/13
IP
Q007150529 Forwards response to NRC B00421 request for info re masonry,
wall design Further revieui of ma^iinrij w.ill design is beinu
conducted at L.iSallo to complete response Lo IE Bulletin
00-11 Package of 231 OVDTSIIO drawings encl
PEOPLES. D L Commonwealth Fdison Co 80/07/03 33pp
BO07100001 Forwards respanoc to IE Bulletin 80-09. "Hfjdramotor Actuatt
Deficient ies. " No eafnty-related sys or component at
Dresden a fc 3 uses AH-90 or NH-90 series hydramotor
actuators
PEOPLES. D L Commonwealth Ed la On Co BO/06/16 3pp
B007O303BV Forwards IE Circular BO-19. "Loss of Reactor Coolant Pump
Cooling & Natural Circulation COD Id own " No written responfiD
required
HEPPLEfiiJ 0 Region 3, Chicago, Office of the Director Q 0/06/20
tp
— 8007150537 Package of 231 conrretu masonry wall drawings to be recalled
at later date for microfilming
» Sareont t, Lundg. Inc BO/07/OB 331pp
F Becuntg. medical, emergency & fire protection plans
8007010347 Forwardc safeguards contingency plan amenii Plan withheld
(ref 10CFHH 790)
PEOPLES,D L Communuealth Tdison Co BO/06/27 lp
0007170430 ForuardB IE Circular BO-14, "lladioactivo Contamination of
Plant Demineral lied Hater Sijs t< Resultant Internal
Contamination of Personnel " No written response required
KEPPLEH.J 0 Region 3, Chicago, Office of the Director QO/06/24
286
DOCKETED STEMS
G Ad jud i catorij c otrespondence
BOO7310243 Forwards Commission H00537 memornndum >< order containing
dB-cisioni on UC<3 7B05Q2 petition for racoiiB idcrat Ion of
79O413 fflemDrandL/n !• order UCS 77110rt pptition sought action
re fire protection for electriral cables
EISENHUTi D Q Diviaion of Licensing BO/06/,25 S9pp
V, Utility Final Safety Analyiis Report (F5AR) fc amends
aOQ7O304Q8 Forwards Amend 26 to FSAtt
NrtUQHTGN, H F Commonwealth Edison Co 80/06/27 5pp
— BOO7Q2042-0 Amend 26 to rSAR> containing portion of responses to OA
Branch li Reactm Sijs Brancli addl first round questions
* Commonwealth Edison Co BO/06/30 SOOpp
BOO7OSOS9^ For-uiani* B00630 affidavit certifying distribution of FSAR
Amend 26
HAUGHTON.W F Commonwealth Edisnn Co QO/06/30 2pp
8007160359 Forwards addl FBflli drsulngs !• info for auiillary t<
containment bldg structures fc components, in response to NRC
BOQ&16 Hr
WALJGHTON, W F Commonwealth Edison Co BO/07/03 107pp
— B00716O566 "Transient Thermal Analysis of Reactor Bldg Dome Ring
Section "
"- Sargent !, Lunrfu, Inc 75/09/23 74pp
— -B007ia05I9 IE Inap llcptH 50-4S6/BO-03 S- 30-437/BO-03 on 80O429 t> 0930.
Noncompliance noted failure to perform surveillance on
valves in storage tt failure to meet usldlng or itoraga
procedure roqulremonts
LEE-E W Region 3, Cnlcago, Office of the Director
DAMIELSDN, 0 H Region 3. Chicago, Reactor Construction fc
Engineering Support Dranch BO/O6/O3 3pp
6007220136 Forwards IE Info Notice 80-26, "Evaluation of Contractor
OA Programs " No uiritteii response requiredJ
KEPPLER.JO Region 3. Chicago, Office of the Director BO/06/10,
IP
BQ0723D003 Forwards IE Inup Repts 5O-456/80--04 & 30-4S7/SO-04 on
B005I4-19 l< notice of violation
FIOHELLI.O Region 3, Chicago, Reactor Construction & Englnaortng
Support Dranch BO/06/10 3pp
— B007230006 Notice of violation From map on H00514-1S
« Rnglon 3, Chicago, Office of the Director SO/O6/09 Ip
— B007330019 IE Jnsp Hepts 50-456/BO-04 «. 30-4B7/BO-04 on HOOS14-19.
Noncompllance noted failure to assure design basis
correctly translated into specs
SCHWEIBINZ,E fi . GALLAGHER, £ J , WILLIAMS, C C ftnglart 3, Chicago,
Office of the Director SO/06/09 7pp
BOO716016S Forwards IE Info Notice 90-27, "Degradation of Reactor
Coolant Pump Studs " No specific action or response
required
KEPPLER'J G Region 3, Chicago, Office of the Director BO/06/11
— BOO7160969 "TfiPrm.il Transient Analysts of Reactor Bldg Structural
Sections "
WHITC.J 0 . KHARANA.S B Sargent ft Lundy, ITVC 7WO3/03 77pp
— 3007160974 Package of 183 structural drawings to he recalled at later
date Far microfilming
« Bargent * Lundy. Inc 30/03/31 102
SQD7270678 Forwards drawings listed in FSAR. Subsecti on 1 7. per NHC
request
NAUGHTON'W F Commonwealth Edison CD BO/Q7/07 Ip
— 8007370657 Package of 63 Oraiuings to Be recalled at later date for
fi Iminfl
* Ues t inghpuse Electric Corp 72/OB/01 63pp
Q0073B07Q9 Forwards IE Info Notice 00-HB, "Prompt Reporting of Info In
Accordance W/10CFR90 33(e> " No urittcn rEBponBO rflquirad
KEPPLER,JO Region 3, Chicago, Office of the Director 80/06/13
6007100004 forwards response to IE Bulletin 80-09. "Hijdramotor Actuator
Deficiencies," No safety-related sga or component at
Dresden 3 & 3 uses AH-9O or NH-90 series hydramotor
actuators
PEOPLES. D L Commonwealth Cdlson Co 80/06/16 3pp
B0070205B9 Foruiarde IE Circular 80-lS, "Loss of Reactor Coolant Punp
Cooling t< Natural Circulation Cooldoun " No written re»pon»B
roquirod
KEPPLER.J 0 RBgion 3, Chicago, Office of the Director BO/06/80,
BO07MO320 Forward H Amend 27 to FSAR, amending application for CPs &
DLs
NAUGHTON.H F Commonmeal th Edison Co 80/07/11 3pp
— B007HOJ3a Amend 27 to FgrtFI, amending application for CPs t- OLs Consists
of responses to addl first round Questions 431 6-421 10,
inadvertently omitted from Amend 26
• Commonwealth Ellison Co BO/07/31 Mpji
BOQ7SHQ340 Foruiards affidavit stating that distribution of facility
rSARiAmend 37 has been made per Enc 1 1 to R5 Boyd 771059 Itr
to C Reed
NAUGHTQN.W F Cotnmonuieal th Fdison Cn BO/07/16 2pp
Inspection
IE Bulletins t, correspondence
B0072103B6 Forwards IE Tirculrfr 80-11, "Grid Strap Damage In
HestinghOUSfl Fuol Assemblies " No written rosponso required
KEPPLER.J Q Hegion 3, CHcago, Office of the Director 80/05/2B,
B0070100ET6 Foruiarrta IE Info Notice BO-S3, "Loss of Suction to Emergency
Feeduater Purapn " No uritten rosponso requii-Ed
XEPPLER.J 9 Region 3, Chicago, Office of the Director GO/OS/31?
B007020050 Foruarrts roaponse to IE Bulletin BO-05. "Vacuum Cnndition
Resulting in Dnmagp bo Chemical Vol Cnntrol Sys (CVC3)
Holdup Tanks " Three Zlon dnldop tanks can 60 valved to
contain primary syi mater Positive pressure Is maintained
PEOPLES. 1> L fomraonuiBalth Edison Co 00/06/04 3po
800718090B Foruarda IE Inap Repta 50 -4S6/BO-03 (, SO-457/BO-05 on
000439 tt 052O ?< notice of violation
FIORELLI.e Heqion 3, Chicago, Reactor Construction !. Engineering
Support Branch BO/Oi/05 ^pji
800717O43O Forwards IE Circular BO-14, "Radloactlvo Contamination of
Plant Deminerall led Water Bys t, Reflultant Internal
Contamination of Personnel " No written response required
KEPPLER, J Q Region 3, Chicago, Hffice of the Director BO/06/S4
IP
B0073302B9 Forwards IE BullBtln 80-16, "Potential HI sapp llcation of
Rosemount Inc Models 1151 & 1152 Pressure Transmitters
M/Either A or D Output Codes " Mr i Hen respanne required
IE Circular 80-J6 also end No written response required
KEPPLER. J 0 Region 3, Chicago, Office of the Director BO/06/27.
BOQ72S0638 Forwards response to IE Bulletin BO-OB, "Examination of
Containment Llnur Penetration Uelde " Dresden Unit 1 designs
uill be reviewed I< feasibility of performing radiographlc
examinations will be assessed before unit returned to svc
PEOPLES, D L Commonwealth Edison Co BO/07/09 7pp.
B0072SQ467 Submits -supp lemental response to IE Bulletin 80-09,
"Hydrairotor Actuator Deficiencies " Utll review remains
incomplete due to necessity of consulting equipment
suppliers Response will be submitted by 800029
PEOPLES' I) L Commonwealth Edison Co 60/07/13 Ip
8007240340 Ac k receipt of B007O9 Itr informing NRC of step* taken to
correct violations noted in IE Infip Repts 50-436/30-05 &
90-457/00-05
FIORELLIiO Region 3, Chicago- Reactor Construction ft Engineering
Support Branch BO/Q7/J& Ip
— B007240351 Responds to NRC B00605 Itr re violations noted in IE In*p
ReptB 50-4S6/BO-03 J. 50-457/60-09 Corrective ac tl ons. weave
weld procedures reviewed h rod oven calibr checked
PEOPLES, D L Commonwealth Edison Co 80/07/07 4pp
— B0071B0513 Notice of violation from Insp on BOQ1S1} & 0520
* Region 3. Chicago, Office of the Director 90/06/03, 2pp
DOCKETED ITEMS
287
Q Roportable occurrences, LERs t, related correspondence
BO072B0670 Deficiency i-ept re intermittent contact operation of W-2
flultch Util mill not implement interim fi< unless no
permanent solution is available prior to Fuel load Util
will Monitor Uestinghouse recommendations
WAUOHTON.U F Commonwealth Edison Co BO/07/23 2pp
B007140320 Fnru
OLs
NAUOHTON- U F
rds Amend 27 tc FSAR, amend ing application For CPs !<
Commonwealth Edison Co BQSQ7/11 2pp
— B007I4032S Amend 37 to FSAR. amending application for CPs !, OLs Consists
of responses to addl First round Questions 421 6-421 10.
inadvertently omitted from Amend 26
« Commonwealth Cdison Co BO/O7/31 I4iip
DOCKET 30-437 BftAIDWOOr) STATION, UNIT 3
A Application/construction stage document 6 & correspondence
SO0701O411 Forwards documentation of safety-related electrical
•qutpment qualification Addresses NRC Questions 40 Dt b
40 77 Requests NHC approval of response format prior to
Incorporation into FSAR
NAUOHTON.W F CommonuiBfllth Edison Co BO/O6/H5 21pp
QOQ723OOO1 Forwards statement of policy re requirements to be met for
current OL applications, as derived from NUREG-O660 !< found
In NUREC-0694
EIBEMHUT, D 0 Division of Licensing 80/06/26 2pp
OO07130329 Forward! response to NRC B00421 request for info re masonry
wall deilgn Further rovlew of masonry wall design is being
conducted at LaBalle to complete response to IE Bulletin
BO-11 Package of 231 ovarslie drauinga end
PEOPLES.D L Commonwealth Edison Co BD/07/OB 33pp
— BQQ7I50537 Package of 231 concrete masonry wall drawings to be recalled
at later date for microfilming
« Sargent & Lundy, Inc QO/07/OB 231pp
F. Security, medicol, emergency !< fire protection plans
B007010347 Forwards safeguards contingent plan amend Plon withheld
(r»f 1QCFR2 790)
PEOPLEBiD Li Commonuealth Edison Co BO/06/27 Ip
3007320540 Forwards affidavit stating that distribution af facility
F5AF1, Amend 37 has beon made per End I to RE Boyd 791029 Itr
to C Reed
NAUQHTON.W F Commonwealth Edison Co BCVO7/16 3pp
0 Inspection mpurts, IE Bulletins !i correspondence
BOQ7210356 Forwards IE Circular SO-13, "Grid Strap Damage in
WestinghouBo fuel Assemblies " No turitten response required
KEPPLEH.J G Region 3. Chicago. Office of the Director BQ/OS/2B
lp
BOO70100B6 Forwards IE Info NoticB 80-33, "Loss of Suction to Dnergatuij
Feedwater Pumps " No written response required
KEPPLER.J G Region 3, Chicago, Office of the Director BO/OS/a?
IP
B007020Q30 Forward! response to IE Bulletin HO-03. "Vacuum Condition
Resulting in Damoga to Chemical Vol Control Sys (CVC5)
Holdup Tanks " Three Zion holdup tanks can be valved to
contain primary sy-i uinter Positive pressure is mnlntainBd
PEOPLES. D L Commonwealth Edison Co BO/Oii/0'l 3pp
BOO71B090B Foriuartfs IE Insp Repts 30-496/BO-05 Si 50-457/90-03 on
800429 d 0520 I. notice of violation
FIORELLIiO Region 3, Chicago, Ilonctor Construction L Engineering
Support Branch 80/0i/05 Spp
— BQ07180313 Notice of violation Prom Insp on 800439 Si 0920
* Region 3, Chicago. Office nf the Director BO/06/03 2pp
O. Adjudicator!) correspondence
BO07310343 Forward* Commission QQ0327 memorandum ti order containing
•'•cUloni on UCS 7 BO 302 petition for reconsideration of
7B0413 Biemorandum (. order UCS 771104 petition sought action
ra fir* protection for eloctrlcal cables
EIBENHUT.D 6 Division of Licensing BO/Oi/25 B9pp
-80071B0519 IE Insp Ropta 50-456/80-03 b 50-457/80-05 on B00429 t, OSBO
Noncompl iance noteil failure to perform surveillance on
valves in storage & failure to meet melding or storage
procedure requirements
IXE.E W Region 3, Chicago, Office of the Director
DANIELSON.D H Region 3, Chicago, Reactor Construction &
Engineering Support Branch BO/O6/O3 Sop
K. Utility Final Safety Analysis Report (FSAR) !> amends
BO0702040B Forwards Amend 26 to FSAR
NAUOHTON.W F Commonuealth Edison Co
BO/Oi/37 5pp
— 0007020120 Amend BA to F8AR, containing portion of responses to QA
Branch i Reactor ays Branch addl first round questions
* Commonweal th Edison Co QO/06/30 HOOpp
B007220I3fa Forwards IE Infn Mutice 00-26, "Evaluation of Contractor
QA Programs " No written response required
KEPPLEFl.J Q Region 3, Chicago, Office of the Director 80/06/10
B007230002 Forwards IE Insp Hepts HQ-4S6/BQ-O4 fc 30-457/BO-O-l on
800314-13 t. notice of violation
FIORELLIiO Region 3, Chicago. Reactor Construction & Engineering
Support Branch BO/O6/10 2pp
BO070B0299 Forwards H0063O affidavit certifying distribution of FBAR
Aaend 26
NAUOHTDNiH F Commonweal th Edison Co BO/06/30 Spp
BO07160559 Forwards flddl FBAR drawings S> info for auxiliary 6
containment bldg structures & components, in response to NRC
800616 Itr
NAUCHTWJ, W F Commonwealth Edison Co BO/07/03 I07pp
— B007160966 "Transient Thermal Analysis of Reactor Dldg Dome Ring
Section "
* Sargent t, Lundy, Inc 79/09/23 74pp
— 8007160569 "Thermal Transient Analysis of Reactor Bldg Structural
Sections "
WHITE, J 0 Sargent & Lundy, Inc 79/05/05 77pp
— B007160974 Package of 102 structural drawings to be recalled at later
date for microfilming
* Saroent t. Lundy, Inc BO/03/31 1S2,
BOO7290678 Forwards drawings listed in FSAR, Subsection I, 7, per NRC
request,
NMJQHTON.W F Commonwealth Edison Co BO/07/07. lp
—8007230006 Notice of violation from Insp on B00314-IS
» Region 3, Chicago, Office of tlio Director BO/06/09 lp
— BOO723O019 IE Insp Deptu 50-436/BO-O1 & 50-497/BO-D4 on BOQ314-15
Noncompllance noted failure to assure design bnsis
correctly translated into specs
SCHWEIBINZ.E R , GALLAGHER. E J , WILLIAMS, C C Region 3. Chicago.
BfflcB of the Director BO/06/09 9pp
B007160165 Forwards IE Info Notice BO-27. "Degradation of Reactor
Coolant Pump Studs " No sparific action or response
renuired
KEPPLERiJ 0 Reoion 3, Chltagn, Office of the Director BO/06/ll
lp
Q007BB0709 Foruardi IE Info Notice BO-2S, "Prompt Reporting of Info in
Accordance M/IOCFRSO QS(e) " No written renponse required
KEPPLER.J 0 Region 3, Chicago, Office of the Director 90/06/13
»P
B007100004 Forwards response to 1C Bulletin BO-09, "Hydramotor Actuator
Daf iciancies, " No safety-related sya or Cdmponont at
Dresden H H 3 uses AH-90 or NH-90 series hydramotor
actuators
PEOPLES, D L Commonwealth Edison Co BO/OA/16 3ap
— B0072906B7 Package of 63 drawings to be recalled at later date for
Filming
*> Ueitlnghouse Electric Corp 72/OB/04 63pp
B0070205B9 Forwards IE Circular BO-15, "Loss of Reactor Coolant Pump
Cooling ft Natural Cir< ulation Coo Id own " No written response
required
KEPPLER-J 0 Region 3/ Chicago, Office of the Director BO/06/20
288
DOCKETED STEMS
9007170430 Foruards IE Circular 80*11' 'Radioactive Contamination of
Plant Demineralued Uater Sys (. Resultant Internal
Contamination of Personnel ' ND written response required
KEPPLER.J G Region 3. Chicago' Office of the Director 80/06/34
IP
8007230237 Forwards IE Bulletin HO-16. "Potential Misapplication of
llasemount Inc Models 1151 t. 1152 Pressure Transmitters
U/Eilher A or D Output Codes " Wi itten response required
IE Circular 00-16 also encl No written response required
KEPPLER.J G Region 3. Chicago. Office of the Director BO/06/27
'P
000725063B Forwards response to IE Bulletin 80-OB, "Examination of
Containment Liner Penetration Welds " Dresden Unit 1 designs
uil) be reviews/I '< feasibility of performing radiographic
eiaminations uill be assessed before unit returned to svc
PEOPLES, 0 L Commonwealth Edison Co 60/07/07 7pp
6007250467 Submits supplemental response to IE Bulletin BO-09,
"Hijdramotor Actuator Deficiencies " Util review remains
incomplete due to necessity of consulting equipment
suppliers Response uill be submitted by 500829
PEOPLES. D L Comma nine a 1th Edison Co 80/07/15 lp
B007240340 /lc k receipt of BO 0709 Itr informing NF1C of steps taken to
correct violations noted in IE Insp Repts 30-456/80-03 b
50-457/BO-05
FIOFIELLI.O Region 3, Chicago, Reactor Construction {. Engineering
Support Branch BO/07/lt lp
—8007340351 Responds til NRC BD0605 Itr re violations noted in IE Insp
Repts 50-456/BO-05 d 5O-497/BO-05 Corrective actions ueave
weld procedures reviewed d rod oven calibr checked
PfcOPLES.D L Commonwealth Edison Co QO/07/0? 4pp
S Reportable occurrences, LERs d related correspondence
B0072B0670 Dsficiency refit re intermittent contact operation of W-2
switch Util uill not implement interim fn unless no
permanent solution is available prior to fuel load Util
uill monitor Hestinghouse recommendations
NAUQHTON.H F ComTionWcal th Edison Co 30/07/23 2pp
DOCKET 50-459 RIVER BEND STATION, UNIT 1
A Application/construction stage documents It correspondence
8007010558 Forwards NRG reorgani lation chart for Ofc of Nuclear Reactor
Regulation, effective B004B8 Considerations re activities
should be made through assigned mgt representatives Areas of
disagreement may be discussed through informal appeal
TEDESCO.R U Aisistant Director for Licensing BO/06/13 2pp
9007230001 Forwards statument of policy re requirements to be met for
current OL app 1 ications- as derived from NUREO-0660 {. found
in NUREG-0694
EISENHUT.DQ Division of Licensing BO/06/26 2pp
6007080191 Forwards Ouali t ication Summary Repts 33-52360-03 for Hope
Crecli tt 33-54237-03 for River Bend reflecting documentation
of electrical equipment qualification Repts withheld <ref
10CFR2 790)
DUVALL.D D Gould-Brown Boveri 00/O7/01 lp
0 Adjudicatori; correspondence
8007310243 Forwards Lommi ssion S005P7 memorandum t« order containing
decisions on UPS 7803O2 petition for reconsideration of
7S0413 memorandum J, order DCS 771104 petition sought action
re fire protection For electrical cables
EISENHUT. D 0 Division of Licensing BO/06/35 89pp
H Oeneral correspondence
BOO7140638 FO1A request for documents re three Mar 19BO violations
occurring at facility
KRAUBE.L AffiU.it ion Unknown BO/06/13 lp
B0070206Q4 Responds to B0061 1 request for clarification re alteration
of property mentioned on Page 14 nf prellmary case rept on
Port Hudson Battlefiald Landmark in LA Alteration referred
to is widening of electrical transmission lino corridor
REOAN.WH Siting Analysis Branch BO/06/19 lp
0 Inspection reports. IE Bulletins & correspondence
B0072S03I6 Forwards IE Info Notice 80-12. "Instrument Folium Cauii*
Opening of PORV ti Block Valve " No specific action or
response necessary
SEYFRIT.K V Regtnn 4, Dallas, Office of the Director BO/03/31
8007310137 Ack receipt of B0030S Itr informing NRC of ct»p* tnlinn to
correct Items of noncompl lance noted in IE Imp R*pt
90-450/79-06 on 791118-81 t. 1304-07 Requests addl info
re Items A-l li tt-3
fiEIDLE.W c Region 4. Dallas, Reactor Construction & Eng Inaaring
Support Branch SO/04/O1 3pp
— 800721O14B FlDsponds to violations noted in IE I nap Rept 90-430/79-06 en
791118-Si b 1204-07 Mortar bar tests are being conducted to
determine if high alkalai cement nay be used ui/utll goitres
aggregate in future
WEIOAND, J 0 Oulf States Utilities Co 00/03/05 4pp.
B00714O968 Forwards IE Bulletin 80-13. "Cracking in Core
Spargers " Ho written response required,
BEYFRIT, K v Region 4, Dallas. Office af the Director
IP
BO/09/1Q,
B007240311 Forwards IE Info Notice 80-21. "Anchorage 6 Support of
Safety-Delated Electrical Equipment " No written rospona*
required
SEVFRIT, K V Region 4. Dallas, Office of the 1)1 me tor 80/O9/1&
IP
8007030249 Forwards IE Info Notice B0~32, "Breakdowns In Contanlnatlati
Control Programs " No written response required
BEVFfllT.K U tlegian 4. Dallas. Office of the Director BO/ 05/28
IP
6007010038 Forwards IE Info Notice BO-23. "Lo«n of Suction to Enter (uncg
Feedwater Pumps " No written response required
SEVFRIT.K V Region 4, Dallas, Office of fcho Director HO/OS/aV.
IP
B007220I04 Forward E IE Info Notice 60-36. "Evaluation of Contractor
OA Programs " No written response required
SEYFrtlT, K V Region 4, Dallas, Office of the Pimctor 80/06/10
IP
B007 1404 01 Forward a IE Bulletin 80-14, "Degradation uf BUR Bern*
Discharge Vol Capability " Ho written rBsponne requlroil
SEYFRIT.K V Region 4, Dallas, Office of the Director [30/06/13
IP
6007270057 Forwards IE Info Noticn BO-2B, "Prompt Hoporting af Info In
Accordance W/lOCr-RSO 93(e> " No uritten response roquirnil
BGVFRIT.R V Region 4. Dallas. Office of the Director 00/06/13
8007240035 Forwards IE Circular 80-19, "Loss of Reactnr Coolant Pump
Cooling & Natural Circulation Cool down " No uirittan r«ipon««
required
BEVFRIT.K V Region 4, Dallas. Office of the Director BO/ 06/20
8007170669 Forwards IE Circular 80-14. "Radioactive Contamination of
Plant Damlneraliiod Mater Bya ft Resultant Internal
Contamination of Personnel " No uiritten response required.
SEVFRIT.K V Region 4. Dallas, Office of tho Director 80/06/34
IP
Q007230376 Forwards IE Bulletin 80-16, "Potential Misapplication of
RosBoiount Inc Models 1191 & 1152 Pressure Transmitters
W/Either A or D Output Codes " Uritten response r»quir«tl
IE Circular 80-16 also oncl No written response required
8EVFflIT.K V Region 4, Dallas, Office of the Director BO/O6/B7,
B007220374 Submits response lo IE Bulletin 80-11 re Category 1
ualls emploged by plants under CP & OL. revliu Station
engineering design criteria indicate that no piping or
equipment uill be supported from masonry tualls.
DRAPER.E L Oulf States Utilities Co BO/07/15, lp
B007140635 Responds to FOIA request for documents re three Mar 1-5BO
violations occurring at facility Forwards listed documents
FELTON.J M Division of Rules and Sflcords BO/07/07 lp
DOCKETED ITEMS
289
DOCKET 30-439 RIVER BEND STATION. UNIT 3
A Application/construction stage documents t, correspondence
SOO70 10330 Foulards NRC reorgan i iflti on chart for OFc of Nuclear Reacto
Regulation. effective B0042B Considerations re activitioi
should be made through assigned mgt reprnsentati ves Areas of
disagreement mag be discussed through informal appeal
TEDESCO.H L Assistant Director for Licensing BO/06/13 2pp
BO0723OOO1 Forwards statement of policy re requirements to bo met for
eurront OL appl icationa, as derived from NUFIEG-0660 t< found
In NUREO-0494
EISENMUT.D 0 Division of Licensing 80/06/36 2pp
nO070e0191 Forwards Qualification Summary Repts 33-53260-03 for Hope
Croek & 33-54237-GS for River Bend reflecting documentation
of electrical equipment qualification Ruptc withhold (ref
10CFR2 770)
DUVALL. D D Gould-Brown Doverl 00/07/O) lp
0 Adjudicator^ correspondence
BO0731O243 Forwards Commission BOQ527 memorandum & order containing
decisions on UC9 780302 petition for reconsideration of
700413 memorandum t. ordor UCB 771104 petition Bought action
r» Ura protection for electrical cables
E1BENHUT.D 0 Division of Licensing BO/Q6/25 B9pp
Q Inspection reports, IE Bulletins (< correspondence
B00723031& For wards IE Info Notice 00-12, "Instrument Failuro Causes
Opening of PORV & Block Valve " No specific action or
raaponae necessary
BEYFRIT.K. V Region 4. DallBUi Office of the Director 00/03/31
tp
BO0714056B Forward i IE Bulletin BO-13, "Cracking in Core Spray
Spovaers " No written response required
SEYFRIT.K V Region 4. Dallas. Office of the Director 00/05/12
lp
BQO724031I Forwards IE Info Notice (30-21, "Anchorage t. Support of
B»f ttij-ftelated Electrical Equipment " No written response
BEYFRIT-K V
IP
Region 4. DoUas, Office of the Director BQ/05/16
8007020249 Forwards IE Info Notice BO-22, "Breakdown!. In Contamination
Control Programs " No written response required
SEYFRIT.K V Region 4, Dallas, Office of the Director 80/05/2B
BO0701002B Foruiards IE Info Notice 00-23, "Luas of Suction to Emergency
Fteduioter Pumps " No written response required
BEYFRITiK V Region 4, Uollas, Office of thn Director BO/03/29
8GQ7S20104 Forwards IE Info Nuticc BO-S6, "Evaluation of Contractor
OA Programs " No written roBponse required
8EVFR1T-K V Region 4. Dallas. Office of the Director BO/06/10
»P
8007140404 Forwards IE Bulletin 00-14, "Degradation of BUR Scram
Di oc barge Vol Capability " No written reeponse required
BEYFRIT.K V Hogion 4, Dallaa, Office of the Director 00/06/12
0007230376 Fonuards IE Bulletin 80-lo, "Potential Misapplication of
RpBOmounl 1 nc Mndols 1ISI ti 1132 Pressure Transmitters
W/fither A or D Output Codes " Writben response requireil
IE Circular 80-16 algn enL I No uintten response required
SEVFHIT.KV Rnginn 4, Dallas, Office of the Director BO/06/27
IP
DOCKET 50-460 HPPSS NUCLEAR PROJECT. UNIT 1
A App 1 iratl on/construL tion stage documents t. correspondence
B00703Q197 Forwards orgatii la 1 1 on charts Tor aft: of Muclear Reactor
Regulation effective 0G042B States means cif appeal of staff
posi tinn
TEDESCO.F! L Assistant Director for Licensing SO/06/12 2pp
8007330001 Forwards statement of policy re i equireme-nts to be met for
current OL app 1 icati ons, as derived from NUHEG-Oft6O t, found
in NUHEG-Q694
EiaENHUT.D 0 Division of Licensing BO/ 06/36 2pp
600721O3?2 Ark receipt of NRC B00430 !tr approving request to
discontinue certain aquatic monitoring '< requesting copies
of util sobroittal* to State of HA re water quality TJRC does
not havo authority to require water quality filings.
RENBEnCER.D L ysshingtnn Pulilic Power Supply System 90/07/14
3pp
0007250344 Forwards "Reliability evaluation of WPPSS Nuclear Projects
Numbers 1 b 4. " in response to NRC 800134 request For
evaluation of loss nf mnin feeduater event
RtHDERGER.D L WaEhington Public Power Supply System BO/07/22
2pp
— B00735D'i52 "Reliability Evaluation of UPPSI Nuclear Projects Numbers
1 6 4, " Vol l.main rapt
MCBFIIDE.A F , MlrJAFIlCK.J W . BOZARTH, 0 P Science Appl icationo.
Inc HO/07/16 214pp
S Adjudicatory correspondence
300731 0243 Forwarria Commission 900*537 memorandum & order containing
decisions on UCS 7 GO!) 03 petition for reconsideration of
780413 memorandum !< urilBr UCS 771101 petition sought action
re fire protection for electrical cables
EIBENHUT.D G Division of Licensing BO/Oi/25 89pp
inapection report1!. IE Bulletins ti correspondence
8007290444 Responds tn IE Bulletin 80-03, "Loss of Charcoal from Btd
Type II, Two-Inch, Tray Adsorber Cells " Slandardued 31 5 X
33 inch, flat bed, Type II chart cifil adsorber coll units used
In all cleanup syo
RENBEROEP., D L U-ish indton Puhlic Power Supply System BO/03/1V
00072HO252 Forwarila IE info Notice BO-26, "Evaluation nf Contractor
QA Programs " No written response required
ENQELKEN.R H Region 5. San Francisco. Office of the Director
BO/06/10 lp
B007300279 Forwards response tn IE Bulletin 80-05 re vacuum damage to
chemical control MJS tanks Design changes tn low pressure
process tanks not required Table describing sut j tanks ti
protection provided end
nENBERGEFi, D L Washington Public Power Supply System 00/06/12
lOpp
0007290057 Forwards IE Info Notice BO-2B, "Prompt Reporting of Info in
Accordatico U/1QCFT130 35(e) " No written response required
BEVFRIT.K v noflion 4. Dollafi, Office of tho Diroctor, B0/0i>/13
IP
B0072900TO ForwordB IE Info Notice 00-aa, "Prompt Roportlng of Info in
Accordance U/10CF-RHO 95(e> " No written response required
ENGELKEN.H H Regtnn S. San Francisco, Office of the Director
00/06/13 lp
BQ07H4003S Forwards IE Circular 80-15, "Loaa of Reactor Coolant Pump
Coaling !< Natural Circulntmn Coolilown " No writton reaponae
required
aCVFFUTrK V Region 4, Dallno, Office of the Diroctor BO/06/20
IP
S007030466 Forwards IE Circular llD-lb, "Loss of Reactor Coolant Pump
Cooling f( Natural Circulation Cooldnwn " NO LJI i tten response
required
ENQELKEN.R H Region 9, Sari Frantisio. Office of the Director
BO/06/20 lp
BO07170669 Forwards IE Circular 80-H, "Radioactive Contamination of
Plant Demineraliioil Mater BIJE & Resultant internal
Contamination of Personnel " No written reaponuo required
SEYFRIT-K V Region 4, Dallas, Office nf the Director 80/06/24
lp.
B0071B0399 Forwards IE Circular E30-14, "Radioactive Contamination of
Plant Dcmineral > led Hater 9ijs !< Resultant Internal
Contamination nf Pprsonnel " No written response required
ENGELKEN.fi H Region 5, San FianLi5cn. Offire of the Diroctor
BO/06/24 lp
290
8007330401 Forwards IE Bulletin BO-16. "Potential Misapplication of
Rosemount Inc Models 1151 t, 1 152 Pressure Transmitters
H/Elther A or D Output Codes " Written response required
IE Circular 80-16 also end No written response required
ENGELKEN, R H Region 5, San Francisco, Office of the Director
BO/06/27 Ip
6007390318 Responds to IE Bulletin BO-08 Problems re containment liner
pentratlon weld do not eiiat at Facility Design for primary
piping, tgpltal of ASME code c on? igurdtians Process pipe/
Filled head assemblies not installed
HENHERGER.D L Washington Public Pouer Supply System BO/07/10
Sff
Reportable occurrences, LEFla ft -related correspondence
--0007110160 IE Inap Rept 90~4il /HO-Q6 on 800414-19 & 31-33 hlonconpllanco
noted measures not established For control of purchaxid Ball
or For DC of identified otructrueB
HESCQTT.H M . GALLAGHER, E J , KNQP, R C Region 3. Chicago, Office
nf the Director 80/09/14 llpp
B007010104 Forwards IE Info Notice 90-23, "Lou of Suction to Eaor|ancf
Feedwater Pumpa " No written response required
KEPPLEFi.J 0 Region 3, Chicago, Office of the Director BO/09/B9,
IP
BOO7320204 Forwards IE Info Notice SO -26, "Evaluation of Contractor
GA Programs " No written responon required
KEPPLER.J 0 Region 3. Chicago, Office of the Director 8O/O&/IO
IP
BOO7170577 Forwards interim deficiency rept re defective condition in
design of Floor supporting component cooling Si makeup pump
area heating- venti lation !> air conditioning si]s Train 0
equipment
BENBERQEH, D L Haahington Public Power Supply System BO/07/11
tp
— 6007170983 Interim deficiency rept re defective condition in Floor
supporting component cooling !< (nafcoup pump area Caused by
usage of incorrect vertical amplified response spectra
Structural frame designed for installation
» Washington Public Power Supply System SO/07/11 3pp
U Congress! onal/Eiecutive Correspondence
B007300367 Submits questions re unusual Financing arrangement between
util t Bonneville Power Administration Related
correspondence
WEAVER, J House of Rep QQ/O7/14 2pp
DOCKET 30-461 CLINTON POWER STATION, UNIT 1
A Application/construction stage documents & correapontfence
B007O10343 Forwards NRC ronrgoniiation chart For Oft of Nuclear Reactor
Regulationi effective BOOflHEl Considerations re activltas
should be made through assigned mgt representative Areas
of disagreement maij be discussed through informal appeal
TEDESCO.R L Assistant Director for Licencing BO/06/13 3pp
B007020433 Notification of cancelled H00624 -26 Site visit W/Utll to
determine statue of completion of const
BUCKLEY, D Licensinn Branch 3 BO/06/17 3pp
BOO 7230001 Forwards statement of policy re requirements to he met for
current OL appl !cations> as derived from NUREG-0660 t found
in NUfiEO-0694
EISENHUT, D 0 Division of Licensing 80/06/36 2pp
0007290559 Advises NRC that util is planning repairs to reactor
pressure vessel BE has been authoriied to perform work,
which has been subcontracted to Reactor Controls, Inc
Defective elbow on reactor drain line mill be replaced
KOCH.L J Illinois Pouer Co BO/07/02 Ip
0, Adjudlcatary correspondence
D007310S43 Forwards Commission 800997 memorandum b order containing
decisions on UCB 7BOSOa petition for reconsideration of
730413 memorandum !< order UCB 771104 petition sought action
re fire protection for electrical cables
EISENHUT.D C Division of LI tens ins BO/0&/85 S9pp
8007160751 Forwards IE Insp Rept 30-461/00-09 on 000920-23 li notice of
violation
FIORELL1,G Region 3, Chicago, Reactor Construction & Engineering
Support Branch 00/06/11 2pp
--B0071607S6 Notice of violation from insp on 000920-23
* Region 3, Chicago, Office of the Director BO/Oi/O9 Ip
—0007160764 IE Insp Rept 30-461/80)~0<? on 800920-23 NoncH«plianc« noeod'
inadequate insp during concrete1 uarb activities
UEBCDTT.H M , GALLAGHER, E J , KNQP, R C Region 3, Chicago, Office
of the Director 80/06/09 7pp
0007140329 Forwards IE Bulletin 80-14. "Degradation of OUR Scram
Discharge Vol Capability " No written response required
KEPPLEH,J 0 (legion 3, Chicago. Office of the Director BO/ 06/1 2
IP
B00703O213 Responds to IE Bulletin BO-09, "Hydramotor Actuator
Deficiencies " Licensee does not utiliie actuator mod'els in
safety-related app 1 i cat ions,
UULLER.G E Illinois Power Co 8Q/06/13 Ip
B0072B0630 Forwards IE Info Notice BO-28, "Prompt Reporting of Info in
Accordance W/10CFR90 93(e> " No written response required
HEPPLER, J G Region 3, Chicago, Office of the Director BO/06/13,
IP
8007110328 Ach receipt of 8O0609 Itr informing NRC of it«ps taken to
correct violations noted in IE Inop Rept SO-461/SO-07,
FIORELLI.Q Region 3, Chicago, Reactor Construction b Engineering
Support Branch 00/06/19 Ip
— B00711O233 Responds to NRC 800309 1 tr re Violations noted in IE Insp
Rupt 30-461/80-07 Corrective actions removed tandulch fc all
weld rods stored in oven fe destroyed flui coated rod to
prevant possible use
GERBTNER.W C IllinoiB Power Co BO/06/09 2pp
B0070303U4 Forwards IE Circular 00-13, "Loss of Reactor Coolant Puop
Cooling & Natural Circulation Cooldoun " No written response
required
KEPPLER.J 0 Region 3, Chicago, Office of the Director flO/OA/20
Ip
0007310363 Forwards IE Insp Rept 50-461/00-10 on 000301-30 b natlctf of
violation
FIORELLIiQ Region 3, Chicago, flaactor Construction & Englnaerlng
Support Branch 00/06/33 2pp
— H00731036i Notice of violation from insp on 800901-30
* Region 3, Chicago, Reactor Construction fc Engineering Support
Branch 80/06/19 Ip
0 Inspection, reports, IE Bulletin* tt correspondence
B007H049S Forwards IE Bulletin 80-13, "Cracking in Cora Spray
Spargers " No written ra-spons* required
3. Chicago, Office of the Director BO/09/1S
900414-IB t< ei-HS fc
tion tt Engineering
—0007310367 IE Insp Rept 30-461/80-1O on BOO 30 1-30 NotlcomplUnc* not»d:
control rod drive penetration rework activity performed y/o
Written approved Instructions or approved design change,
LlVEMOflE.H H , KNOP,fi C Region 3, Chicago, Office of th>
Director BO/06/19 Ipp
B007170495 forwards IE Circular BO-1 4, "Radioactive C on tamt nation of
plant Demlnerallied Mater Bya ti Resultant Internal
Contamination of Personnel " No uiritten respona* required
KEPPLER.J 0 Region 3, Chicago, Office of the Director 60/06/24
4-18 & 21-23
SO/05/16 Spp
B007H10516 Act receipt of B00617 Itr informing NRC of stops taktn to
correct violations noted in IE Insp Ropt 30-461/80-04
FIORELLI,Q Region 3, Chicago, Reactor Construction & Engineering
Support Branch 80/06/34 Ip
291
— BOO721O921 Responds to NOC BOO 520 Itr re violations noted In IE
Rapt 3O-4&1/BO-06 Corrective actions inspectors reinstructod
on visual imp tc bend test requirements
OERSTNER.W C Illinois Power Co BO/Ofa/17 4pp
Insp
BOO7S30330 Forward* IE Bulletin 80-16, "Potential Misapplication of
Ronejaount Inn Moduli 1191 d 1152 Pressure Transmitters
U/Either A or D Output Codes " Written response required
IE Circular BO-16 also enc 1 No written response required
KEPPLER.J 0 Region 3. Chicago, Office of thn Director BO/O6/B7
0 Adjudicatory correspondence
B007310343 Foruari): Commiasicn BOO527 meirorandum ti order containing
decisions on UCB 7B0503 potitian for recnntl deration of
7S0413 memorandum & order DCS 771104 petition sought action
re fire protection for electrical cables
EISENHUT, D G Division of Licensing BO/OA/a5 89pp
Inspection reports, IE Bulletins t, correspondence
8 Raportable occurrences. LERs & related correspondence
0007140302 Ack receipt of 000613 interim deficiency rept re concrete
snbeds that Failed to flliet designer specs
FIQRELLIiO Region 3, Chicago, Reactor Construction & Engineering
Support Branch BO/06/24 lp
80071B0911 Ack receipt of HO0624 interim deficiency rapt re control rod
dvlve penetrations through dryual 1
FIORELLIiO Region 3. Chicago, Reactor Construction & Engineering
Support Branch OO/O7/O7 lp
8Q0716Q&2& Forward* deficiency repta inadvertently sent to Region 3
instead of IE headquarters
HULtEB.O E Illinois Power Co HO/O7/OS 2pp
— >f)O0716063B Interim deficiency rept re use of Incorrect soil
character iitic value as design input to computer modal for
developing bldg response spectra Insufficient info Is
available to determine reportabi 1 lti| of possible deficiency
KOCH.L J Illinois Power Co 20/03/31 lp
— "BOO71AOA31 Deficiency rept re breakdown In GE C&ID quality sus Improper
or Inadequate QA documentation mas provided for
BBftttu-rBlated equipment [local panels) delivered to site
Product quality certifications revised accordingly
KQCH.L 0 Illinois Power Co 80/04/30 Hpp
8007140495 Forward s IE Bulletin BO-13, "Cracking in Core Spray
Spargers " No written response required
KEPPLER.J 0 Rugion 3, Chicago. Office of the Director 00/09/12
B007010104 Forwards IE Info Notice BO-23, "Loss of Suction to Emergency
Feeduiater Pumps " No written response required
KEPPLER.J 0 Region 3, Chicago, Office of the Director SO/08/29
B0072B0204 Forwards IE Info Notice B0-3i, "Evaluation of Contractor
QA Programs " Mo written response required
KEPPLER.J 0 Region 3. Chicago. Office of the Director 00/O6/10
lp
8007140325 Forwards IE Bulletin BO-14. "Degradation of BUR Scram
Discharge Vol Capability " Mo written response required
KEPPLER.J G Region 3, Chicago- Office of the Director 80/06/13
IP
BOQ7030S13 Responds to IE Dulletin BO-O9, "Hydramotor Actuator
Deficiencies " Licensee does not utllne actuator models in
safety-related applications
UULLER.Q E Illinois Power Co BO/06/13 lp
B0072B063B Forwards IE Info Notice BO-3S, "Prompt Reporting of Info in
Accordance U/10CFR50 99(ul " Nn written response required
KEPPLER.J S Region G, Chicago, Office of the Director BO/06/13,
B0071&06&9 Potential deficiency rept re concrete Imbeds providing
lateral support for RHR heat eichangers which do not meet
daiigner specs Util will make reportabi 1 i tg determination
uittlin 2 uks
KDCHiL J Illinois Pouier Co BO/06/13 lp
80070305B4 Forwards IE Circular BO-IS, "Loss nf Reactor Coolant Pump
Cooling d Natural Circulation Cooldown " No written response
required
KEPPLER.J G Region 3. Chicago, Office of the Director BO/06/20
— 8007160679 Potential deficiency rept re control rod drive penetration*
through dryuell wall Util requires appro* 3 uks to make
rep or tab! 1 ity determination
KOCH.L J Illinois Power Co DO/06/24 lp
0007230318 Interim deficiency rept re nonconforrning elbow in two-Inch
drain line from reactor pressure vessel Foreign matl found
In elbow Removal of elbow scheduled for wk of 600714 Final
rept will be submitted late Aug 19BO
KOCH.L J Illinois Power Co 80/07/14 2pp
B007300427 Supplemental deficiency rept re Sargent d Lundij soil
Characteristics error In facility design Investigations
revealed use of incorrect value of soil modules for
compacted backfill Reportablllty determination not complete,
KOCH.L J Illinois Power Co BO/07/18 2pp
9QQ72SOSO& Final deficiency rept re control rod drive 1CRD)
penetrations through drywell urall Control drive tubes which
have been adversely affected by welding are being replaced
KOCH.L J Illinois Power Co BO/07/ IB 5pp
DOCKET 30-462 CLINTON POWER STATION. UNIT 2
A. Application/construction stage documents tt correspondence
B007010243 Forwards NRC reorganiiation chart for OPc of Nuclear Reactor
Htgulatlont effective BOOTHS Considerations re activltes
should be made through assigned mgt representative Areas
of disagreement may be discussed through Informal appeal
TEDESCOiR L Assistant Director for Licensing BO/06/13 2pp
0007230001 Forwards statement of policy re requirements to be met for
current DL applications, as derived from NUREO-0660 b found
in NURE0-0&94
EIBENHUT.D 0 Division of Licensing BO/06/H6 3pp
S007170495 Forwards IE Circular BO-14, "Radioactive Contamination of
Plant Demlneraliied Water Sys t Resultant Internal
Contamination of Personnel " No written response required
KEPPLER.J 0 Region 3, Chicago, Office of the Director GO/06/24
B007230330 Forwards IE Dulletin 80-16. "Potential Misapplication of
Rosemount Inc Models 1131 & 1152 Pressure Transmitters
H/Either A or D Output Codes " Written response required
IE Circular 80-14 also encl No written response required
KEPPLER.J 0 Region 3, Chicago, Office of the Director BO/06/27
S Reportable occurrences, LERs & related correspondence
B0071B03I1 Ack receipt of BQQ634 interim deficiency ropt re control rod
drive penetrations through dryuiall
FIORELLI,G Region 3, Chicago. Reactor Construction & Engineering
Support Branch BO/07/07 lp
0007160636 Forwards deficiency ropts inadvertently sent to Region 3
Instead of IE headquarters
MULLER.O E Illinois Power Co BO/07/OB 2jip
DOCKET 30-463 FULTON QENERATINB STATION. UNIT 1
A Application/construction stage documents !t correspondence
6007110274 Forwards addl questions re alternative sites If utll Intends
to pursue CP application. NRC should be advised of schedule
for submitting required info
MILLER, J R Standardization t. Special Projects Branch 80/06/35
4pp
I Financial information
5007010133 Responds to 800603 Itr to G Cunningham transmitting util B-7
registration statement No inaccurate statements or financial
Inconsistency Identified
CHRISTENBURV, E Hearings Division BO/06/19 lp
292
DOCKET 3O-464 FULTON QENERATINQ STATION, UNIT 2
A App 1 ication/c onstruc tion stage documents & correspondence
8007110374 Forua-rils add! questions re alternative sites IP util intends
to pursuo CP ap pi ication, NftC should be advised of schedule
POT submitting required info
MILLER. J H Staiidardnation t. Special Projects Branch SO/06/25
4pp
I Financial I "Formation
HQ07OlOI3a Retpond* to HOOiOS 1 tr tn G Cunningham transmitting util S-7
registration statement No inaccurate statements or financial
inconsistency identified
CHRlBTENBUnr. E Hearings EMMsion aO/Oi/19 Ip
"8007000013 Page 13 of applicant response to JF Doherti| t4th aot at
interrogatories Includis info re rod drop analysis tc
perf ormance
BIDDLE.C T Houston Lighting & Power Co BO/06/30 Ip
— B007090017 Response to JF Doherty I5th set of interrogator la*. Contain!
statements re neutron data. clad gun 11 Ing calculation. control
rod drop accident & reactor pressure vessel pedestal
Affidavit (. Certificate of Eve encl
BIDDLE,C T . NEWMAN. J R Houston Lighting & Power Co BIDDCEtC.T.
Baker 6 flntta BQ/Q6/3O 21pp
8007090290 Request to withdraw portion of Intel venor 8OO&11 notion to
compel discovery from applicant due to availability of
certain documents for insp.re most recent rate case
H/Certiflcate of Bvc encl Related correspondence
BAKER, B Affiliation Unknown BO/06/30 3pp
DOCKET 30-466 rtLLENS CREEK NUCLEAR STATION, UNIT 1
A Application/construction stage documents & correspondence
8007030339 Comments on proposed rules lOCFRbO !< 31 roqulremBHt that
CJas-5 9 accidents be considered in EIH should be applied
retroactively to plant since site has not teen fully
determined
DdHEriTY.JF Dnberty.JF 90/03/04 Ip
&QQ7B3QQOI Forwards statement of policy re requirements to be met for
current HL appl t cat! ons, as derived from NUREG-0640 tc found
in NU REG -0694
EISENHUT.D G Division of Licensing BO/06/26 2pp
G Ad judi catorij correspondence
B007O3O029 Response in npposi 1 1 on to applicant notice of deposition
Urges that applicant be ordered to informally contact D
Mai-rack for deposition arrangements after answering encl
interrogatories ?c request for production of documents
MARBACK, D Harraek, D 80/06/11 Ip
— S0070300a9 Interrogatories t, requests for production of documents re
intervenor Contention BE that E1S do not address power line
Impacts on migratori; uatorfoul Certificate of <3vc encl
Ha-rract, D BO/Q6/11 5pp
00071100BO Motion to compel applicant answers to intervonors ' B0010B
interrogatories d request for productiun of documonts
Certificate of B>/c encl Related correspondents
MARflACK, D HaTmckiD RCNFflD, W Aff i 1 iation Unknown aO/Ot/16
3pp
6007100174 Concurs u/aoO6!l proposal to consolidate interrogatories
Bator l.Cumings 1 , TX PIRO Addl 33, Doggett 4 t, Perrenod 1 u/
Oatcr aa representative Confirms that Doggott uiill lead
party on consolidated -contentions Bishop 14 t< Dog pott l(h)
nDQ(?ETT, S A Doggett. 9 A 80/06/30 3pp
80Q703O471 Responso to JF Doherty fourteenth sat af Interrogatorios
Includes info re antlcipatd cnrlclimpnt of spent fuel stored
in pool racks, aolf-suf f Jcienty of fuel pool cooling sys t
applicant position an Keg Guide 1 13 W/Cortl f icate of Sv<-
DIODLE.C T , NEUMrtN.J R Houston Lighting !, Power Cn DIDDLE, C T
Baksr *, Datts BO/06/24 37pp
BOO703O63i Order denying B Daktr 800611 motion to compel discovery from
spp 1 leant, COMBO I i dating certain at Baker, Cumlng 5, Ti PIRG,
Doggett & P err e nod contentions f< granting partial iclief
to Rentfro !< Mari-acli re motion to compel applicant answers
WOLFE. S J Atomic Safety and Licensing Board Panel BO/06/37 3pp
BOO703OOil Protective orier flllQujino JF Dohcrty to inspect specific
safo tif- related items from veniur GE "Reed Rapt," In
posse s- si an of util Insp is conditioned on confidential
treatment per encl agreement
HQLFE.S J Atomic Safety and Licensing Board Panel BO/06/27 Bpp
B007B30246 FOIA request for 50 documents for use as Intervenor in
Fad 1 1 ty proceeding
DOHERTY. J F Dohflrty.J f 80/06/37 4pp
—8007070298 Accepts sugoestted financial qualification contentions Bottr
1. Cumins liOoggett 4, Perrenod 1 b TX PfllG Addl 31 Agrmii to
be lead party provided that applicant an«u«ra Dogoati fiyit
set of interoggatorles W/Certlf Icato uf Svc
BAKER, B Affiliation Unknown BO/06/30 iZpp
G0070B003B Motion for issuance of subpoena directed to D MorT-*ck for
B00700 deposition, per ASLB B00623 /nomorandum & order
Certificate of Svc b draft nubpoena ui/dgpoeitlon schedul*
•ncl Ftelatgd correspondence
CULP,H H , CDPELAND, J 6 Houston Lighting It Pouier Co CUtP.R It
Louonstein, Neuman, Reis, Axelrad 6 Tall 00/07/01 9pp
800709 01B9 Ansuiers to SA DoQgett ti UM Perrenod int*rrog«tcirlBi
Identifies H Dean as ultness anticipated to tnitlfy ra
financial qualifications Includes info re cost of delay* &
OA funding U/affidavlt & Certificate of Svc
CPPELAND.J 0 i NEWMAN.J (I Houston Uightlna t. Power Co
CDPELAND.J 0 Baker ti Botta BO/07/01 21pp
B0070ao030 Confirm* 800702-03 teUons (. advises of 000710 molting at
Travolodge Astrodome to discuss contentions, motions for
luminary disposition & proposals for hearing schedule Input
tf suggestions aro beneficial
BLACK. R L Hearing Branch t 60/07/03 2pp
B0070B0044 Confirms telcon agroement NRC rn«pon>«s to 13th set of
interrogatories Will be filed by B00721 & to 14th e»t of
interrogatories by S0072B
HDHINKI.9 H Hearing Branch 3 BO/07/03 Ip
B007310116 Interrogatories £i requests for production of documents
directed tn util Requests idontl f ication of witnesses ti
expert tea t imonij-relat«d documents m/ factual basil for
Bipert opinion
BIGHOP J 11 , HISHOP.M Aff i 1 lation Unknown 00/07/05 Ip
8007310IOB Interrogatoi-ien K request for document* directed to otil
Requests most recent population projection data Ii
methodology used for updating projection Related
correspondence
BISHOP, J N , DIBMOP.M Affiliation Unknown QO/07/06 8pp
BOO716D3AO Responio to applicant first tot of intsi-roflotorle* & raquiit
for production of documents ro impact of tranxmiision linns
& FES
MARRACK D Marratk.D BO/07/OB Ip
— 0007160369 n0spon»e to applicant second set of interrogatories &
request for production of documents re intervenor pleadings
before ASLD & A3 LAB Certificate of 8vc encl
MARRACK, D Marracl, D BO/O7/00 3pp
S00716D970 Response to B Marrack first »et of interrogntorie*. Includes
statements re transmission lines & alternative transmission
sites & routes Prospective witness FJ Sthlight prof
qualifitations, affidavit & Certificate of Svc encl
HANCOCK, D , NEUMAK.J " Houston Lighting i< Power Co HANCOCK «D
Da Mr fc Bottl GO/07/03 llpp
H007170139 Fourth sot of Interrogator! es directed to util re financial
qualifications Includes questions on disciplinary action* %
role of Houston Industries Related correspondence
BAKER, D L Affiliation Unknown BO/07/00 9pp,
oruiards page IS to be inserted in applicant response to JF
th set of interrogatories Related correspondence
Baker & Botts |H)/O6/30 Ip
--800717017I First set of interrogatories directed to NHC r« financial
qualifications, hearing eipectation Si witnesses intended to
be called
BAKER.B L Affiliation Unknown BO/07/OB 4pp
293
6O07I60i45 Response to Intervennr D Marrack BOO30B interrogatories
Identifies eipoi t witnesses cipected to be called in support
of consol idated flentfro Contention S Affidavit t. Certificate
of Svc encl
HANCOCK. D . NEWMAN, J R Houston Lighting & Power Co HANCOCK, D
Baker b Botts BO/O7/O9 13pp
B00729O424 Response to Potthuff BOOT 1 6 motion (-or eitension Of
discovery Applicant unit respond to untimely interrogatories
Si other discovery requests by B00731 Certificate of Svc
end
COPELAND.J G , NEWMAN. J fl Hriuston Lighting J. Pcusr CQ
CCPELAND.J 0 Raker t< llotts 80/07/21 4pp
0007170374 Interrogate! i es fc request fnr production of documents
directed to NUC Requests factual basis of anticipated
testimony re natural gas uso as fuel ti subsequent casts of
electricity W/Certif icatlon of Svc Ficlated correspondence
8COTT.J M Teias Public Interest Research Group BQ/07/09 <lpp
0007300116 Motion fnr preparation of siippl to FFS adequately assess
Class 9 accident impact Allpgi". that TES mill violate NEPA
if Class 9 15 not addressed Urges revieuj of environ
contentions W/Certi f i cato of Svc
SCOTT, J M Teias Public Interi'sl Research Group 80/07/21 0(1 p
ing
BO07140013 Advises of Chairman of A5LB suggestion that parties meet on
BOO710 to prosont schedule agreement to Board
BQH1NKI.8 M Hearing Branch 3 BO/O7/10 3pp
B00716O639 Response in opposition to intervpnor JF Doherty 000627
motion for financial assistance ASLB authority doi-s not
•itend to appropriation of funds Certificate of Svc encl
COPCXAND.J 0 . NEWMAN- J R Houston Lighting S. Power Co
COPELAND, J 8 Baker f. Botts BO/07/11 Spp
8007220953 Reoponse in apposition to applicant 8Q062A rnqueot for
denial of intervenor 000611 motion to compel Applicant & NRG
did not raise timely objections to intervenor due right to
discovery H/supporting documents l< Certificate of Svc
MAHRACK.D Morrack.D RENTFRQ, W Affiliation Unknown BO/07/12
hop
BQ071G0432 Response to JF Dohortu 19th request for documents Literature
an applicant turbine-NEDO 21.617 re analog transmitter trip
unit BUB. Figures IS 1-3B S k 7 7-3 of FSAR t. other documents
are available fur insp d copying Certificate of Svc encl
DIDDLE, C T F NEWMAN, J R Houston Lighting Sc Pouier Co DIDDLE. C T
Baker I> Botts BO/07/13 4pp
B0071B0240 Forwards FH Potthoff B00709 hand-serviced first set of
interrogatories directed to Houston Lighting t Power
BLACK. R L Hearing Branch 1 SO/07/ 16 Ip
— B0071BOS76 First set af interrogatories directed to Houston Lighting
fouler Requests factual info re U fuel sources, costs, method
at mining & stripping. Hi to & eitent of mining & feasibility
of marine biofarm for synthetic natural gas supply
POTTHOFF.F H Affiliation Unlmoun BO/O7/O9 3pp
B00722O004 Order advising that ASLB will dismiss Fl Framson Contention 1
& will permit litigation af JF Doherty Contention 11 Directs
FH Potthoff to respond to applicant first interi ogatories by
000739 Marracb motion to quash subpoena denied as mtiot
WOLFE, 8 J Atonic Safety anil Licensing Doard Panel BO/07/16 Spp
BQQ7B3Q240 Partial response to FTJ1A request for 20 ilocuments far use as
Intervenor In Facility proceeding Forwards doctimentB llstod
In App A No documents have been located subj to Items Iks
Bearch is continuing W/o ends
FELTON.J M Division of Rules and Records 80/07/li 3pp
B007250703 Ordpr scheduling BOOB13-11 nrrhearmg conference in Houston,
Ti Schedule for responses to motions fnr summary liispositlon
ti for testimony !. commencement of evidpntiaii| hearing mill
bo sat during conference Contentions will be simplified
UDLFE, S J Atomic Safety and Licensing Board Panel 60/O7/32 2pp
0007270032 Response to Potthoff firot set of interrogator! BB Objects to
major! ty of interrogatories on tin sis of irrelevancy
Applicant has not commissioned >>tudij on marine bio farm
feasibility to provide synthetic nos U/Certi f icate of Bvc
COPELAND. J Q . NEWMAN, J fi Houston Lightiog ». Pomer Co BO/07/23
7pp
8007390746 Order admitting defeired ciintentioiis re adequacy of
emergency evacuation plans ttirects consolidation of
contentions !i initiation of discovery liy 0009Q5 ^chifUEsler
admitted as intervening pdrty Defines actions re Final rule
LINENBEHQER.Q A, WOLF, S J AUimir Safety and Licensing Board Panel
BO/07/24 2pp
0007300113 Response to Baker request for documents Host recent rate
filing before TX Public Utll (.ommission available For insp
ft copying Certificate of "5vc end Related correEpondonce
COPELAND. J O , NEWMAN, J R Houston Lighting * Power Co
COPELAND, J <J Baker !. Bolts GO/O7/^fl 3pp
0007300449 Response to Dohorty requests for admissions Admits presence
of small blouidoun load due to BUR pipe rupture Admits lack
of automatic moans to place HMD EIJS in coolin-g mode W/
Certificate of Bvc !i affidavit RelatLd correspondence
COPELAND.J 0 Metropolitan Edison Co NEWMAN, J R Houston Lighting
& Pouier Co COPELAND, J 0 Hater •< Botts 00/07/24 14[ip
B007300402 Response to 00070'? inter rog.iton es f. request for production
of documents Includes info ro natural gas d J tornative,
conservation I. intavconuifc t. error in computer progroni !.
technical qual i f icdtieno Certificate of Svc end
COPELANn, J 0 Houston Lighting J< P.IUIDT Co CCJPELAND, J Q Oaker &
Botts BO/O7/H5 3lpp
B007300435 Response tu 000706 interrogatories & requests for production
of documents Includes info re no women t of liraios River
toward proposed nipelino route t msi peak overpressure for
oach critical structure Certificate nf Svc cncl
CDPELAND.J 0 Houston Lighting !. Power Co COPELflNB, J 8 Baker &
Botts 80/07/25 17pp
BM72306Q3 Objections to applicant !< NRC schedule proposal givvn at
00O710 mneting Dates nF responses re summary disposition 81
prahearlng conference re financial qualifications,
unreasonably early Questions rewriting of contentions
BAKER, D Affiliation Unknown BO/07/ 16 2pp
BOO71B0426 Forwards notice of RL Black appearance !. CP Moodhead
uil thdrauial in proceeding
BLACH.R L Hearina Branch 1 00/07/17 4pp
B007B50031 Rcsponue In opposition to JF Doherty Q00627 motion for
financial aoBlatance from funds appropriated by Congress
Forthcoming change in rules will provide relief per
Commission 79121O approval Certificate of Bvc encl
BOHINKI,9 M Hearing Branch 3 BO/O7/17 4pp
S007220159 ForuardB NRC proposed schedule t< NRC proposed revised
schedule suggesting B00000 prchearing conference Tentative
contentions encl for prehearing framework re summary
disposition & simplification nf text
BQMINKIiB M Hearing Branch 3 BO/07/1B 113pp
BOO 724 00 10 Partial response to JF Doherty 13th set of interrogatories
Includes statements tt discussions re transport theory, rod
drop accident !• spiint fuel pool loss of water Explains fuel
rod ballooning & swelling U/affidavit ti Certificate of Svt
MOONiC U Assistant Director for Licensing BO/07/S1 3Bpp
0007310094 Response to JM !< M Bishop 000705 interrogatories i requests
for production of documents Identifies witnesses t<
Bummari let substance of tcstimnni; Certificate of Bvc ti prof
q.ualif icotions encl Related correspondence
COPELANDiJ 0 . NEHMAN,J R Houston Lighting f< Pomer Co
COPELAND.J G Baker t. Botte 80/07/25 17pp
B00731O300 Response to Jr Doherty 16th sot of interrogatories Submits
info re qualification of uelder & procedures for cailwelding
Describes scram reactivity function !< coefficient Affidavit
& Certificate of Svc encl Related correspondence
COPEUAND.J B , NEWMAN, J R Houston l.inhting t, Pouor" Co
CDPELAND.J Q Bakpr t. RottB BO/07/21) 25pp
0007300397 Partial response to fourteenth set of interrogator! BK
Includes info re application of North Anna cri teria. pressure
vessel integrity d Fracture toughness surveillance program
CW Moon affidavit d Certificate nf Bvc pncl
aDHINKI.B M Hearing Branch ') MOHN, C W Assistant Director for
Licensing BO/07/20 13pp
0007300404 Partial response to fifteenth set of interrogatories
Includes info re contiol rod drift out, reson.ince parameters
& gadolinia distribution In furl pellet* fw lloon affidavit
tt Certificate of Svc encl
SOHINKl.a M Hearing Branch T MOON, r W Assistant Diractor for
Licensing 80/07/2B 15pp
300423 JlBspanse to i ntervennrt ' first set of interrogator i es re
nancial qualifications SER Suppl 2 contains out-of-date
fa li^C ulll present anal ij a it uhen util update* filings
•jf qua 1 1 f icati cms, af Fidavi t !. Cf-rti f i cats of Eve ami
JN.C W Assistant Director fur Licensing SOHINKljS M Hearing
anch 3 aO/07/£a 13pp
Response to JT Doheftg S0070B second request far admissions
ita that HRC misstated info provided in Amend S to
illcatlon Discusses failure to scram on routine shutdown
Jul 19flt> Affidavit fc Certificate af Svc end
NiC W Assistant Director foi Licensing ECH1NK1.S H Hearing
n-Eh 3 BO/O7/3Q 5pp
DOCKET BTN-90-4G3 HCLF CREEK GENERATING STATION
A Application/construction stage documents & correspondence
B O07aSOD4 6 Summary of GO04O! meeting u/utt] In Bethesda< MD rl rsviau
plans for utils DL app 1 1 cation*
LICITFIA,E A Licensing Drench 3 QD/04/B3 Spp
GOQ723GQ01 Forward H statement of policy re requirement* to ba H*t for
current DL app 1 1 cat tons. OB derived From WUREQ-0660 ti found
in Nimeo-0ii94
EISENHUT.D 0 Division of Licensing BO/O6/36 3pp
31031S Partial responses to Til PIflC interrogatories It production, of
cume-nts !ncltiil«& statements re FES, TlftR t, QA program
seusses reduition of occupational radiation Bipoaures
'init Reg Guidfl H OS W/affidavit t. Certificate of Svc
itt.C W Assistant Director for Licensing BO/07/29 a?pp
BOO717O313 Discusses Dames & Moore & KS OBDlogicftl Survng avalUBtiong
of paisiblo pop-up in floor of ultimate he-at sink Pop-upi
napped lei flour are nnntectonlc !< pose no ihaiard tn
integrity pF saf ety-pe lated structureH
LEFEVflE, H Qco sciences Branch 90/07/02 3pp
J101-73 Forioardf rlUItEO-0594i "Otmpat 1 dial Radiation Eiposure at
rcmerclal Muclcar Pouier Reactors 197B. " re HHC B00729
ipon-se to TX PlflO interrooatories fe production of
cunents W/o em 1
ftCK.R L Hearing Hrancn J QO/O7/30 Ip
— DO07170317 Forwards photographs of two minor pop-up finturif In uppip
part of PI attsmouttv Limestone in ultimate hoat lint
eicavatiiDn at FatllJtij Concur* w/D Fenster- & site geologists
that pop~jps uere caused bij differential thErmsl oipsnilon,
UILBOM, F a Kansas. Univ of OO/O6/02 7pp
30034-B Requests Lhangp nf atfiJressee on NJIC correspondence from
Turner to OW Opreai Jr Addrea-s i-s unchanged
lEfljO H HnUBtoti Lighting *. Pouer Co QO/O7/33 Ip
BOD7300337 Furuards Union Electric 5< KS Can b Electric rt»pon«»» to
JVRC questions re facllitg design fa const QA programi Kivitid
DA prngram, Iticnrpoi-at Ing utll commltmentc & aQreeminti. yi 11
bfl available within VO days
SEIKEN.a J Nuclear Poui&r Plant Standard* Committee BO/07/M
54 pp
T 50-467 AUEN9 CREEK HUCLETAH STrtTlDN. UNIT a
i jud icatarij correspondence
OOO7300511 Foruardi info & draufinge re CategoTij 1 maionru ua
response to BO 072 I Itr Calculations encl
TETRICK.M A Btandardiieil Nuclear Unit Pouer Plant Sijstem
7?pp
110243 Foruapds CommisBion BO 0937 memorandum d or-der containing
nsions on UCS 760302 potiticn fnr reconwideration af
J413 niemoranJum J. order UCB 77110'! petition (aught acti-un
fire protection For electrical cables
JGNHUT.D B Division nf Licensing BO/Q6/S5 S9pp
J3024t FDIA request for 20 documents for USE as intervenor in
.ilitij pro-ceeding
IERTV.J T DaNertg.J F 60/06/37 4pp
30240 Partial response to FOIA requast for SO documents for uae as
ervenor in facility proceeding Forwards doiumunts listed
App A No documBiits have been located subj to Itoms 162
irch is continuing W/Q otic Is
.TOH.-J M Division of Flutes and Records HD/O7/U 3pj
— 8007300514 "Architectural AuxiHaru ft Roactor Eldg Flour Plan.
Elevation li 974 Ft "
» Bflchtel Corp 1D4&A 77/D4/D4 Ip
— £3007300517 "Architectural Auiltlarij & Reactor Elldg Floor Plarir
Elevjtion 2.000 Ft "
* Dectitel Corp lOflf-t 79/04/04 Ip
— S007300530 "Architectural Auiillary & Reactor Bldg Floor PUm
Elevation H. OSA Ft "
* Dechtel Corp 1O466 7Vfll/Q5 Ip
— B007300B21 "Archl t»ctoral ' CMU Mall Penetrati prtSt Au«llorv Bldo "
* Bechtel Corp 10466 77/04/14 Ip
neral corrBspondence
IQ034B Request* chanje of addressee on NRC corrasponiTBncH from
Turner to OH Oprea, Jr Address Is unchanged
EA,O U Houston Lighting & Pouer Co DO/O7/23 Ip
— GOO7300S2a "Artrhit»ctui'al Au»iliaru tc Hojctar
Elevation Sj 047 Ft, & Inchas "
* Gechtrel Corp IO*66 79/04^04 Ip
Floor
—8007300324 "Architectural CMU Mall Penetration*, Control Dldg
» flechtM Corp 10466 79/08/19 Ip
T 30-471 PILGRIM HUCLEftfl PDHER STATION. UNIT 2
plicalion/ecnitrui tion stage documents t< correspondence
— B007300SBA "Architectural Auxiliary t, R.aetor Bldg Floor Plan*.
Elevations 1,909 Ft. 1 , 999 Ft t. 2.013 Ft.ii InchBi "
« BechtfrL Corp 1O466 79/O4/O4 Ip
3000J Foruavdi statement off policy re requirements to be met ti
•rent OL. app 1 1 cations, at derived from NUH £0-0460 Si found
NUSEG-OJ.94
1ENHUT. D 0 JMV|0|nn af Licensing aO/OA/Si 3pp
judicature correspondenc e
10243 Forwards Commission BOO327 memorHndum & offer containing
isLoiis an UCS 780502 petition for reconn iderat I on of
•413 memorandum fc order UC9 7711O4 petition sought action
fire protection for electrical cables
ENHUT.D 0 Division nf Licensing 80/06/33 B7pp
< nn reports. IE Bulletin's & correspondence
— 8007300520 "Arch Uec tural CMU Hall Penetrations. Control Bldj t
Communication Corridor- " '
* Bichttl Corp 10466 BO/01/23 Ip.
— BOD730Q929 "Architectural AuxiliariJ Dlij.Btalr* A-l K A-lAiPUni 1
Butt Ions "
» Bechtel Corp 10466 7B/10/O4 Ip
— B007300333 "Arch itectural, CMU Mall Penetra tioni, Control Bldg ti
Communication Corridor "
» Bechtel Corp 10466 79/03/39 Ip.
— BQ073D0934 "Arc h 1 t«c tural , Aux 11 1 ary &14g<i Btair A-2,Plani !< Bictloni
» Becntel Corp 10^*6 70/IO/04 Ip
Reporting of Info In
required
e Director
--BOO730G935 "Arch i tec fcural CMU Wall Penstrot ions, Control Bid) fc
Communication Corridor "
* Dflchtel Corp 104AA BO/O3/13, Ip
-~ao&7300&36 "Architectural. Auilltary Dldji El»vator2i PUn« S< Sictions. '
* Dechlel Corp 104iA 7B/1O/04 Ip
295
— BO07300338 "Architnctural CHU Mill Penetrations- Control Bldg !,
Cooaunication Corridor "
« Bechtvl Corp 1O46A 79/03/29 lp
— 8O0730Q339 "Architectural ' CHU Wai 1 Penetrations, Control Bldg I.
CoB»unlcatlon Corridor "
» Bnchtel Corp 1O466 00/03/09 lp
— BOO73O0340 "Architectural Control (• Diesel Generator Bldgs t,
Coiamunicatlon Corridor- Floor Piano, Elevations 1,774 & 1-7Q4
Ft "
» Bnchtel Corp 1O466 7B/O7/H lp
B007220140 Forwards Final response to 791102 Itr re concerns on
facility Areas of response include eitendod time for
Commission dec i elan, location !< condition of PDR in
Burlington, KS t, corruption allegations
BTELLO.V Office of Inspection !< Enforcement, Office of the
Director BO/O7/O3 3pp
— 8O07220I46 Advises that Commissioners Kennedy ti Hendrie tt Chairman
Ahearne agree that Director's decision re const activities
need not be reviewed Commissioner Bradford preferred
Commission to make review Problems u/c an tractor sited
CHILK,8 J Office of the Secretary of the Commission BO/O3/31
IP
— BQ073OQ342 "Architectural Control t, Diesel Generator Dldos &
Caanunicatian Corridor, Floor Plans, Elevations 2,000 & 2-016
Ft, »
* Bechtil Corp 10466 77/04/04 lp
-1-B0073OQ343 "Architectural CHU Mall Penetrations, Control Bldg,
Coiuunicaticm Corridor (. Raduaste Hldg "
* B«eht»l Corp 10466 00/03/12 In
— B00730Q346 "Architectural Control t. Diesel Generator Bldgs &
CoBflHinication Corridor, Floor Plane- Elevations 2,033 b Hi 047
Ft "
» Bechtel Corp 10466 79/04/04 lp
— B0073Q0347 "Architectural Oeneral Masonry Details "
u Oichtal Corp 1Q466 QO/O1/2B lp
— BOO7300349 "Architectural control Bldp. fc Communication Corridor Floor
PlaniElnvatloni E2- 073 Pt, 6 Inches « Raof Plan, Elevation
B,OB7 Ft, 2 Inchis "
* Dachtil Corp 10466 79/04/O4 lp
— B00730O331 "Architectural OnnBral Masonry Details "
o Bechtol Corp 10466 79/10/32 lp
— BO07300934 "Architectural Acceva Control Floor P Ian. El ovation !,9B4
Ft "
» BftchtBl Corp 1046A 70/00/39 lp
— DD07300396 "Architectural Access Control & Control Room Areos, Inter lor
Elevations "
» Beciltol Corp 10466, 79/04/19 lp
—BOO7300B39 "Architffctural, Control Bldg & Communication Corridor.
Mitcallancous Details & Btalrs C-2, CC-2 ti CC-3 "
* B»cht»l Corp 10466 79/O3/O7 lp
— BOO73O0562 "Archi toctural Hot Lab Equipment 8. Furniture Layout-
Elevations Si DBtoils, Elevation 1J9B4 Tt "
* Bocntel Corp lO46i!, 70/07/15 lp
— BQ073O0364 "Arcliittttural Computer Room tc Control [loom Dttailod Floor
Plan*, Elevation 2,047 Ft. 6 InchiB "
« Becht.l Corp 1O466 BO/01 /2B In
— aOO73D0966 "Architectural Control Bldfl-Btair C-t, Plans t. Section "
» BechtBl Corp 10466 70/08/24 lp
— 800730036B "Architectural Communication Corridor, Stair CC-1, Plans k
Section "
» Qachtnl Corp. 10466 BO/01/07 lp
-BO072201S4 Requests reason Porr time eitenEion for invostigation Into
ravoliing CP for proposed facility Suggests transfer of LPDF1
to more accessible library MRC should not depend nn util tD
rept Internal personnel corruption
WHITE- T Affiliation Unknown 79/11/02 2pp
It General correspondence
£3007230633 Responds to 79O904 1 Lr to DOE re const problems at
facility NRC 79071B 1 tr to Christy attempted to dispel
concern re adequacy of concrete in hase mat Ltr From KB
State Bldg Trades Council one) In support of NRC position
3TEL.LO-V Office of Inspection t, Enforcement, Office of tho
Director 00/07/07 6pp
—0007330647 Responds to US State Bldg !, Const Trades Council 77090B Itr
Ha NRG basil mat acceptance decisions uerc basod on concrete
samples ma Jo from base mat tost mli Structure uiill meet
intended safety function Related documentation end
8TELLO.V Office of Inspection t. Enforcement, Office of the
Director 79/10/02 14pp
H Antitrust correspondence
0007350690 Requests util suppl antitrust info submitted u/BOQ30<b Itr
Requests response within 3O days
NASH.D Utility Finance Branch SO/07/OB 3pp
0007230S47 Forwards FH notice nf receipt of info for antitrust review
of DL application Notice will he published simultaneously In
Hated newspapers Si trade journals
YQUNQBLODt), Q J Licensing Branch 1 00/O7/1D Bpp
— B007330S33 Notice of receipt of info For antitrust review of DL
application
VQUNQDUODD, B J Licensing Branch 1 BO/07/10 3pp
8Q073B0013 Forwards FR notice re receipt of info for antitrust review
of DL application,
YOUNGBLQOD. B J Licantins Branch 1 00/07/10 lp
0007280015 Forwards FR notice of receipt of info for antitrust review
of OL application
YOUNOBLOOD. D J Licensing Brand. I 80/07/10 lp
0, Inspection report!.. IE Bulletins !< correspondence
B007H3032I Forwards IE Info Motice BO-12, "Instrument Failure Causes
C-peniny of PORV t. Dlocfc Valve " No speilfii action or
response necessary
GEYFRITiK V Region 4, Dallas- Office of the Director 00/03/31
— B007300370 "Architectural Elevator 1 Communication Corridor Plans.
Section* & Details "
» Bechfcel Corp 10466 00/02/26 lp
F Security* modi col, emergency Si firi> protection plans
8007110137 Informs that responses have not boon received to Encl 1 of
8DO320 r«q,uest for addl info on OA prooram For fire
protection
VCKJNOBLDOD. B J Licensing Branch 1 BO/06/30 3pp
fl Ad judlcatory correspondance
B007a<10913 Forwards IE Info Notice 90-21, "Anchorage t, Support of
Safety-Related Electrical Equipmunt " No written response
required
SEYFRIT.K V Region 4, Dallas, Office of the Director 00/09/16
8007070003 Forwards IE Insn Kept 50-4B3/BO-Of] on 000107-11 i. SO-39
notice of deviation
BEIDLE, W C Region 4, Dallas, Reactor Construction ti Engineering
Support Branch BO/05/33 3pp
— B0070700B7 Notice of deviation Prom intp on 000407-1 1 !. 30-39
» Reeion 4, Dallas- OFfice of thn Director BO/OS/32 lp
SO07310243 Forward* Commlaslon 000327 memorandum & order containing
diciilons on UC8 730502 petition for reconsideration oP
7B0413 (nHmorandum & order UC8 771104 petition sought action
r» fira protection for electrical cables
EIBENHUT-D S Division oF Licensing BO/06/25 09pp
-8007070091 IE Jnsp Rapt SO-4BS/BO-OB on tiOO-107-ll (. EB-39
Noncomplianco noted failure to designate cable tray for use
in Class IE t< II/I as safety-related
GROSSMAN, W A , OBERQ. C R , MARTIN, I. K Region 4, Dallas, Office of
the Director 80/05/22 llpp
296
DOCKETED ITEMS
BOO71IO1B7 Foiuards IE Insp Rept 3O-4B2/BO-O9 on, 000429-0503 fc notice
of violation
SEIDLE.M C Region 1, DallcTS. Rpactnr CnnetriK tion & Engineering
Support Branch BO/05/23 2pp
B007170fa73 ForuiariEs IE Circular BO-14. "Radioactive Contamination of
Plant Deminerii 1 i led Mater Sys t Resultant Internal
C an tami nation of Personnel " No written response required
SEVFRIT, K V legion 4, Dallas. Office at the Director 80/04/24
lp
—6007110192 Notice of violation from insp
» Region 4, Dallas, Office of the Director
3p p
~ -G00711Q17B IE Insp He»t 50-flB,>/aQ-O<9 on BOOHEf-0302 Noni nmpliance
noted improper -storage of safety-related i t*(ns, fai lur-B to
identify none tin f-n ruling conditions >i failure to provid*
Region. 4. Dallas, Office
J. W A , nBERG, C [{ , TAP I A. J I
the Director BO/05/22 'Spp
OOO703025^ Forwards IE Info Notice 00-22, "BreaJi floun* In Contamination
Control Programs " Nn written response reo_uirod
EEVFHIT.K V Region 4, Pallas, Office of the Director 30/05/39
IP
8OO721O34B Foruards IE Circular E10-13, "Qnd Strap Damage In
WuatingliouGP Fuel rta&pmb 1 i es " No uritten response required
BEVFR1T.X V Ifoc-icn 4. Dallas, Office of the Director BO/O5/3B
lp
000701QQ25 Forwards IE Info Notice BO-23, "4.055 of Suction to Emergent!)
Feeduater Pumps " No uritten response required
SEYFFUT.K V Region 4. Dallas. Office of the Director 80/03/39
BQ07010162 Responds to IE Bulletin 79-2B. "Passible Malfunction of
NAKCQ Model EA13O Limit Switches at Elevated Tflmps " Top
cover gaskets on suitches tif/app 1 i cob 1 & date cades mill be
replaced on valvea listed in sncl
PETIilCrt.N A •Stand.-irdlied Nuclear Unit P-DUSV Plant Busted!
BO/Q6/02 Hpp
8007330373 Forwards IE Bulletin 80-16. "Pntentlal Misapplication of
Rosemount Inc Hode la 1151 & 1132 Pressure Transmitter*
M/Glther A or D Output Codes " Written response required
IE Circular BO-I& also &nc 1 No uirltten response requlrad
8EVFRIT.H V Bsgioit 4, Dallas. Office of the Director 80/06/87
lp
0007390013 Acfc receipt of 800621 I tr informing] NRC of *topi taken to
correct violations no tod in IB Insp Rept 50-482/QO-09
8EIDLE.U C Region 4. Dallas, Raactor Construction Ic Etigineerina
Sup-port Branch 00/07/09 lp
— BOD7290O17 Reaponds to WIG 800533 1 tr ro violations noted In IE In«p
Rapt 9O-482/SQ-Q9 Corrective actiono Danial mechanical
Bupervi si on instructed \HJ const managnr re UP-I-D1
proc-odures
K.OESTER,0 L Kansas Oas t, Electric Oo BO/Ofi/24 4pp
•5 Reportable aceurrencesj LEFs & rela-ted correspondence
8005090053 Interim deficiency rept ro Ruslin vertical fire danperi. Due
to problems identifiod after B00213 reptiaddl detlgn mods
are required For dampers Kt will be described by BDQ513
PETRICK.N ft Slandflrdiiedi Nuclear Unit Pouer Plont System.
BO/O4/O3 2pp
PNO-lV-OO-OSa an BO061O, five cnftiinen utre tarmlnated ai
result of investigation by site mgt Si Level 1 QC civil
Inipactor terminated for ontry of False test info
OSERO, C R . CRDBSMANrW A Region 4, Dallas, Office of the Director
30/06/11 Sfp
3007100441 Keaponda to IE Dulletin 30-05. "Vacuum Condition Resulting
in Damage to Chemical Yol Cnntroi Sijs (CVCS) Holdup Tanks "
SNUPPB recycle tioldup tanks do nut depend on pressure
regulators to compensate for leva! variations
PETRICH.^ A Standardised Nuclear Unit Pousr Plant System
BO/Ob/Ob 3pp
e00721Q04B Ack receipt off BOO&ia final deficiency rept re Bunher fUno
Corp electrical penetration •sEBmblloSv Rept lal 1 1 be revleWBd
t cvaluatBil
CARLSON. R T Region 1. Philadelphia. Reactor Operations Nut liar
Support Branch BO/O6/S3 lp
BO 07230 IDS' Forwards IE Info Notice 30-26., "Evaiuation of Contractor
QA Progrnma " Ha written r-psponae required
EEYFRIT.H V Dogian 4, D3ll,)>i, Office of the Director HO/0&/10
BOO71603B4 ForuiaTds IE Info Notice 3O-27, "Degradati OBI of Reactor
Coolant Punp< Studs " Ho specific action, or r?!>ponae
required
SEYFRIT.K V Region 4. Dallas, Office oF tflB Dlractor 80/06/11
tp
B007290066 Forwards IE InFo Notice 60-23, "Prompt Reporting of Info in
Accordance W/10CFR50 S&le) " No uirltten response required
SEVFfilT.K V H«Bion 4, Dallas, Office of the Director BO/Qfa/13
13007050378 flusponds to IE Bulletin HO-09, "Hudramotor Actuator
DeficienciBS " Two safety-related uaea of ITT General
Controls Modclt AH-90 & NH-'PQ series hydramotnr actuators
have teen identified ITT is testing actuators.
PE7R1CK.N A BtandardiiEd Nuclear Unit Pnuei- Plant Gystem
80/04/16 ]p
B0073B0734 Forujards It Insp Fiept SO-4B2/RO-1 1 c-n 800527-30 & notice at
violation
5EIDLE,U C Region 4, Dallne. Reactor Construction t< Engineering
Support Branch 90/06/17 3pp
— B007S9072B Natitp nt violation from insp on BOO327-3O
» Ftejion 4. Dallas, Offlcf af thp Director flO/06/13 lp
5u-flBH/BO-ll on BOOS27-30 Moncomplianc e noted
atlnn uelila tn accordancp itf/ME-40QO
jf the
ruction t>
Pump
B007210231 Ack receipt of HOOfiQfc interim deficiency ropt ro centrirunal
charging pump operation following secondary s.ide high energy
lino rupture Rept uiill be ravinuBd l< ovaluatvd
CABLBON, R T Region 1, Philadelphia, Reactor Operations Nuclear
Support Branch BO/OA/Sib tp
S007O7O3B9 Discuaoes 81)0680 rept of potential dtflcloncy re aictuiv*
pressure in fccduater lines following postulated high sn*rp(j
line break Eicessive presBure doos not constitute deficiency
per 10CFR50 33e
PETRICKiN A Standarditeri NuclBor Unit Power Plant System
BO/Olb/30 1 p
BO 07 B9 021 5 Ack receipt of BQ-OblS Itr re pipe tupport suiay ctrut
deficient!/ Rept eipactvd by 300731
CARLSOW.fi T Hegion ii Ph iladslph l«i Reactor Construction tt
Engineering Support Branch 60/07/O3 lp
— 8007390234 C DTI firms SDD611 tele on requesting extension until Q00731 to
submit rept of significant deficiency; ve pipe support *way
struts Add 1 time required for further engineering
examination b study
SEIKEN, S J Standard i ied Nuclear Unit Pouer Plant Syitem
Ip
0007310297 Ack receipt oF S00630 final deficiency rapt re poitulattd
fseduater line piping break
CARLSON,!) T Region l, Ph ilaile-lplt laj Reactor CnnBtructlon t
Engineering Support Branch BOVQ7/11 lp
— 8007310302 Deficiency rept n postulated feeduater line piping hreok
Excessive peak pressure c ale u-lat ions performed by Dechtel
considered part oP nnrmal design evnlutian Doot not consider
matter reportable per 10CFR30 53<e)
PETRtCK.N rt Standnrdiiffd Nuclear Unit Pnuer Plant System
BO/Oi/30 lp
BO07H9O590 Final ifefic icncg rnpt re generic dof ic ienc ies in Corner fc
La da. Inc pipe support suay struts Orisite insp ti/or tettB
Llill assure that a«5erab 1 IBS are acceptable for use Corner
Si Lada ijeinerit rept end
PETRICK,N A Btandardi ied Muclear Unit Pouer Plant Syitem
BO-/07/24 9pp
DOCKETED ITEMS
297
U Congressional/Executive Correspondence
9M711034i Responds to BOOS 16 1 tr re delays in DL application revieus
Full Pdvieu schedules are being developed for licensing of
docketed applications Delays resulted Prom TMI-2 accident
AHEARNE, J F Commission 00/06/23 Ip
— -0007300321 "Architectural CMU Udll Penetrations, Ami lary Dldg "
» UBChtel Corp 10466 79/04/11 Ip
— B0073Q0532 "Architectural Auiiliari) f. Reactor Bldg Floor Plan,
Elevation 2,047 Ft. 6 Inches "
» Bochtel Coip 10466 79/04/01 Ip
— BO07110SS2 Responds to 800516 Itr re delays in DL application revieus
Full reviBBi schedules are being developed for licensing of
(toelrstdd applications Delays resulted from TMI-2 accident
AHEARNE, J F Commission 80/04/33 Ip
--BO07I1O366 Respond! lo BOO916 1 tr re delays in OL application reviews
Full review schedules are being developed for licensing of
docketed applications Delays resulted from TMI-2 accident
AHEARNE.J F Commission BO/06/23 Ip
— 9007110363 Respond* to 800516 1 tr re delays in DL application revlcua
Full review schedule* are being developed far licensing of
dacltatad application* Delays resulted from TMI-2 accident
AHEiWNE, J, F Commission BO/06/23 Ip
— 0007110371 Discusses concerns about delays In NRC revieui of OL
applications NRC failure to carry-out revieu in timely
nannir increases cost oF electricity supplied to
constituent*
EAOLETDN.T.F . DANFORTH, J C , KASSEBAUM. N L Senate BO/05/16
4pp.
DOCKET BTN-50-4B3 CALLQWAY PLANT, UNIT 1
A. Application/construction stage documents b correspondence
B007230046 Summary of Q004O1 meeting ui/util in BetheBda.MD re mvieu
plans for utils OL applications
LICITRAiE A. Licensing Branch 3 BO/01/29 5pp
— B0073OO524 "Architectural CMU Hall Penetrations, Control Bldg "
* Bochtel Corp 1O166 79/OB/19 Ip
— SQ07300326 "Architectural AuiiUory f. Fir-actor Hidg Floor Plans,
Elevations 1.998 Ft, 1 . 9B9 Ft !. ,>: 013 Ft, 6 Inches "
* flechtol Corp 10466 79/01/04 Ip
— BO073OO528 "Architectural CMU Wall Ppnptrations. Control Hide •<
Communication Corridor "
* Bechtel Corp 10466 RO/OI/21 Ip
— BO073O0529 "Architectural Auilli.iry Bldo, Stairs ft-1 b A-1A, Plans t.
Sections "
* Bechtel Corp 10466 78/10/04 Ip
— B007300533 "Architectural TMU Hall Ppnetr.itions, ( ontrol Oldg &
Communication Corridor "
« Bechtel Corp 10166 79/03/29 Ip
— B007300534 "Architectural AuiiliHry Dldg. Stair A-2, Plans !. Sections "
» Bechtel Corp 10466 78/10/04 Ip
— B007300-J39 "Architectural CMU Wall Penetrations, Control Bldg t,
Communication Corridor "
« Bechtel Corp 1O466 BO/Ol/13 Ip
— Q007300534 "Architectural Auiilisry HI dg, ClevatorS, Plans (. Sections "
* Bechtel Corp 10466 78/10/04 Ip
H007100379 Forward* B«eht«l rept BLUE-70O t. Daniel lntl Corp 000529
talcon record shaet li QC Procedure QCP-5O7, Revision 5, per
HRC 8OQ329 r»n.U9«t for addl info on embed rapt Number of
a«bedi involved to be determined bij Jul 1930
BCWELL. D P Union Electric CD BO/O6/19 40pp
B00714D374 Confirms B006B6 meeting ui/util in Glen Ellyn, IL to discuss
propoiad reorganization of Daniels lntl QA/OC function
KEPPLER, J. 6 Ragion 3, Chicago, Office of the Director BO/06/24
IP
B007330O01 Forward* statement of policy re requirements to be met for
currant OL applicationn as rtprivcd from NUREQ-O660 t. found
in NUREO-d674
EIBENHUTiD 0 Civilian of Licensing BO/04/26 2pp
BOO7290034 Declinm BOOMS invitation to attend State of MO Dept of
Natural Retaurcaa 800716 public hearing re NPDES application
due to prior commitment! Requests copy of hearing testimony
DENTDN.H.R Officn of Nuclear Reactor Regulation, Director
90/07/21 2pp
— B00729003B Invites NfiC participation in B00716 public hearing re NPDE9
application Legal notice of meeting end
LAFBER.F A HUnoiiri, State of SD/06/1B Bpp
0007300337 Forwards Union Electric t> US Gas d Electric reBponaes to
SRC questions re facility design & const O.A programs Revised
OA pragrani incorporating util commitments t< agreements, will
ba available uilthin 90 days
BEIKEN, 6 J Nuclear Fouler Plant Standards Committee QO/07/2B
24pp
ROO7300911 Foruards info fc drawings re Cdtegory 1 masonry malls, in
ruponie to 600731 Itr Calculations encl
PETRICK. N A Standardlied Nuclear Unit Fouiur Plant 3ystem
BO/O7/29. 79pp
— B007300S14 "Architoetur>al Auxiliary & Reactor Oldg Floor Plan,
Elevation 1,974 Ft "
» Bochtel Corp 10466 79/04/04 Ip
— B007300317 "Architectural Auxiliary t- Reactor Bldn. Floor Plan,
fltvntion 2,000 Ft "
* Bach' t el Corp 10466 79/01/04 Ip
— BO073005SO "Architectural Aunilidry t< ficattor Dldg Floor Plan,
Elevation 2,036 Ft "
a Bechtal Corp. 10466 79/11/03 Ip
-- -B007300S3B "Architectural CMU Wall Penetrati one- Control flldfl t,
Communication Corridor "
» Bechtel Corp 10466 79/03/39 Ip
— 8007300539 "Architectural CMU Wall Penotrrttinns, Control Bldg fc
Communication Corridor "
* Bechtel Corp 10466 DO/01/05 Ip
— B00730054O "Architectural Control !< Diunel Generator Bldgs ti
Communication Corridor, Floor Plans. Elevations 1,974 & 1,984
Ft "
• Bechtol Corp 10466 7E3/09/I1 Ip
— -B007300542 "Architectural Control !< Diesol Generator uidpH t<
Communication Corridor, Floor Plnns, Elevations E!. 000 t. S. 016
Ft "
» Bechtel Corp 10466 79/O4/04 Ip
—B007300S43 "Arcln Lee tural CMU Uall Penetratl ons. Control Bldg,
Communication Corridor !< Kaduaste Dldg "
» Bechtel Corp 10466 BO/03/12 Ip
— 8007300546 "Architectural Control t( Diesel Generator Dldgs L
Communication Corridor, Floor Plans, Elevations Z, 032 It 2,047
Ft "
» Bechtel Corp 10466 79/04/04 Ip
— B007300547 "Archi ter turol General Masonry Details "
» Bechtel Corp 10466 C!0/Ol/yH Ip
— BOO73O0519 "Architectural Control nidg Ji Communication Corridor Floor
Plan.KlBvations 2,073 Ft. (. Inches t. Hoof Plan, Elevation
2iOB7 Ft, 2 Indies "
H Bechtel Cnrp 1O466 /9/O1/04 Ip
— B00730O591 "Arrfti tec tural General Mdcnnry Details "
» Bechtel Corp 10466 79/lO/D^ Ip
—8007300554 "Archi tec tural ACCPIE Control riour Plan, Elevation 1,9B4
Ft "
» Bechtel Corp 1O466 7R/CH/39 Ip
— 8007300336 "Architectural Access Control & Control Doom Areas, Inter lor
Elevations "
» Bechtel Corp 10466 79/04/19 Ip
--B007300539 "Architectural Control Dldg I, Communication Corridor,
Mlscrillaneous Details fc Stairi C-B. CC-2 (. CC-3 "
# Bcchtol Corp 10466 79/03/07 IP
298
DOCKETED STEMS
— B0073003A2 "Architectural Hot Lab Equipment t, Furniture
Elevations ft Deta i 1 s, El evati on 1.984 Ft "
•* BecJitel Corp 10466 7B/O9/J3 lp
— 3007300364 "Architectural Computer Roam i
Plans. Elevatio-n £.,047 Ft.6 Inches "
* Each t el Corp 1O466 SO/Ol/23 lp
Control Room Detailed Floe
— 800730QS66 "Architectural Control Bldg. Stair C-l, Plana & Section
* Bechlel Carp 10146 7B/OB/24 lp
BOO7190Q17 Foruiards IE Inap Rapt "lOMBS/BO-ia on BOO 30* -09, No
ncncompl lance noted
FIOIBELLI. Q. Region 3. Chicago, Reactor Construction d Engineering
Support Branch BO/O6/04 2pp
— HO07I 50023 IE Insp Rept 30-103/00-13 on 800S04-Q9 No noneooplianee
noted Major areas inspected follouup of 10CFRSO 53> repti 1
procedures !< uork on seal uolds for control rod drive
mDchatiiHmB
ERH,C A , VARDEU.T E . KNtlP, R C Region 3. Chicago. Office of th>
Director BO/06/04 Hpp
— BQO730Q5&B "ArcJi i tectural Common i cat i on Cor rldor. Stair CC-i, Plans b
Section "
» Becfttel Corp 10446 BO/O1/07 lp
— BOD7300570 "Architectural Elevator 1 Communication! Corridor Plans.
Sections It Details "
* Hechtel Corp 1O166 BO/03/36 lp
F Security, medical, emergency fj fire protection plans
0007110154 Informs that responses have not been received to Encl 1 of
S003SO request for add! info on OA program for fire
protoc tiori
YOUNGBLODD.B J Licensing Branch 1 BO/O6/30 2pp
B0071S0534 Informs that guard training plan required by IOCFFt73,App B.
will be submitted «u BO 11 01.
DHVAN. J K Union Electric Co ao/07/OB 2p p
O Adjurticataru, correspondence
B00710O441 Responds to IE Bulletin BO-OS, "Vacuum Condition Rmulttng
In Da mag* to Chemical Vo 1 Control SUB (CVCS) Holdup Tank* "
8NUPPS recycle holdup tanks do not depend on pressure
regulators to compensate for level variations
PETRICK.N A Staiidordimd Nuclear Unit Poutr Plant Sg«tem,
BO/06/06 2pp
8007S10116 Foruiarda IE Tnsp Rept 90-4S3/BO-10 on 800324-87 Ir 03O2, No
n one oinpl lance noted
KEPPLEfi.J 0 Region a. Chicago. Office of the Director 80/04/10,
2pp
--8007210123 IE Insp Rept 50-483/00-10 on B0033&-37 t. 0802 No
noncompl iance noted Major areas inspected allegation of
detection of uield crack In section of stainless steel pipe
leading from accumulator tank
BURTON, R. H . HAN9EN, H A , NORELIUS, C A Region 3, Chicago, Office
of the Director BQ/Oti/07 7pp
B007220223 Forwards IE Info Notice BO-26. "Evaluation of Contractor
OA Programs " Ha uiritten response required
HEPPLEF1.J 0 Region 3, Chicago, Office of the Director BO/06/10
BOO7310243 Forwards Commission 600337 memorandum & order containtnp,
decisions on DCS 7BQ-5O2 petition for reconsideration of
760413 memDrandum & order UCQ 77I1O4 petition sought action
re fire protection For electrical cables
E1SENHUT.D G Division nf Licenaino BO/04/29 B9pp
B007 160300 For mar (fa IE Info Notice BO 27, "Degradation of Reactor
Coolant Pump BtutJs " No specific action or rotponsa
required
KEPPLE=R,J 0 Rngiori 3, Chicago. Office of the Director SO/06/1J
H General correspondent D
90072 9OOB 5 Respond u to 800329 1 tr Prom Lauison, Md acJiool students to
President Carter re adequacy of ituali Ficationa of personnel
designing plant Certain design activities failed to meet
NRC requirements Util corrective actions under review
D1RCKS.W J Office of the £>ecutlvB D-irectnr for Operations
80/05/30 lp
B0072S0070 Resporids to cncl BO0304 1 tr to President Carter re nuclear
energy Use of both coal t, nuclear power necessaru, to free US
oF o v er depend en c e on Foreign oil President Carter 771207
press release & ennrgi) plan encl
DENT DM, H R Office of Mud ear Reactor Regulation. Director
BQ/O&/27 33pp
O Inspection reports, IE Bulletins tt correspond ence
8007110522 Forwards IE Jnsp Rrpt SO-4B3/BO-IS on B00107-3S «. notice
of violation
FIORELLIjO Region 3> Chicago. Reactor Construction t, Englcieerlng
Support Dcanch BO/OS/ 19 2pp
BOO72flOi.aB Forwards IE Info Notice HQ-28, "Prompt Reporting of Info in
Accordance W/10CFR30 3D(e) " Mo written response required
KEPPUEfl.J 0 Region 3, Chicago, OPfice of the Director BO/06/13
lp
8007O2037B Responds to IE Bulletin BO -09, "Hudramotor Actuator
Deficiencies " TLIO saf etu-ro lated uses nf ITT Qoneral
Controls Models AH-90 b NH-9O series hydramotor actuators
have bean identified ITT is tpsting actuators
PETRICn.N A Standardized Nuclear Unit Pouier Plant Sgitem
00/06/16 lp
B0071 004 3A Forwards oihiblt-s yhlch mere omitted from IE Intp Rept
30-403/00-10
KEPPLER.J G Region 3, Chicago, OPfico of the Director BO/06/17
13pp
B007020S70 Forluards IE Circular 80-13, "Loss of Reactor Coolant Punp
Cooling fc Natural Circulation Cooldoun " No written responi*
required
KEPPLEP.J 0 Region 3. Chicago. Office of th« Director BO/ 06/20
— 9O0714092& Notice of violation from insp an 800107-25
» Region a, Chicaga, Office of the Director GO./05/lt. lp
— B00714O5fll IE map Rept 50-483/30-13 on HO(M07-a5 Noncoraji 1 ionce noted
failure to atbure that appliLable regulatorit requirements
are correctly translated into drawings' proceJuroa t<
Instructions
KNOP.R C . HANHEH,g A Region 3. Chicago, Office of the Director
flO/Q5/l<b Bpp
B007310401 Forwards IE Circular 80-13, "Or id Strap Damage in
Hesfcinghouse Fuel Assemblies " No written response required
KEPPLER.JO Reginn 3, CJiicago, Office of the Director 80/03/2B
B007O10123 Fnrwarils IE Info Notice BO-23, "l.oia of Suction to Emergency
Feeduater Pumps " No written response require-d
KEPPLER.J Q Region 3, Chicago, Office of the Director, 00/05/29
1".
B007010I6S Records to IE Bulletin 79-SB, "Poflsible Hatfunction of
NAKCO Model EA1QO Limit Buitchus at Elevated Temps " Top
covffr gasliffts on 5u)it(.h»s ^applicable ilate codos uiill be
replaced on valvps listed In enc I
PETRICK.N A BtandarJiied Nuclear Unit Poiuev Plant austem,
BO/fJi/OS 2pp
B00717031B Foruards IE Circular 80-14, "Radioactive Con torn! not ion of
Plant Demlnuraliiod Water Su,*i b Resultant Internal
Contamination of Personnel " Nu written response required.
KEPPLEFI.J a Region 3, Chicago. Office of the Director BO/06/24.
80073-00131 Forward a IE Insp Rept SO-1B3/BO-16 on 000610-12 No
non compliance noted
FIORELL1.O Region 3, Chicago' Reactor Construction l< Enginoerlng
Support Dranch 80/06/84 Hpp
— B00730O1S7 1C Insp Rept 30-433/80-16 on B0061Q-13 Nn noneomp li«nc»
noted Major areas inspected follouup of 10CFFJ90 5S(e> rapti
& unresolved item
WEBCOTT, H M . OALLAOHER. E J , UNOP, R C Region 3, Chicago, Office
of the Director 80/06/24 3pp
B0073O01&0 Forwards IE Insp Rept 5D-483/BO-19 on 80O901-30 i notict of
violation
FIORELLI'O Region 3. Chicago, Reactor Construction ti Engine'erinj
Support Branch BO/06/24 2pp
— B00730O1A4 Notice oF violation from insp on BOOSO1-30.
* Region 3. Chicago, Office of the Director BO/06/33 tp
DOCKETED ITEMS
299
—-8007300169 IE Imp Rept 5O-4B3/BO-13 an BQ0301-3Q Noncomp 1 iance nnte
failure to *Biure that electrical components stored in place
Mem .properly protected from damage or deterioration
HANBCNtH A . KNQP. R C Region 3. Chicago. Office of the Director
0Q/04/B3 llpp
BQ072'50336 Interim deficiency rept re ou t-nf-to! erance conditions on
major bolt !( minor nut diameters for rnafclt supplied by
Industrial Mechanics, Inc Insp program established "•
equipment on order Final rapt e«pECted by BQ1201
QRYflN, J K Union Electric Co 90/07/13 Ip
8007830343 Forward! IE Bulletin 80-16. "Potential Hi sapp 1 ication of
Roienount Inc Models 1191 Si 1152 Pressure Transmitters
M/Eiither A or D Output Codes " Hritton response required
IE Circular 00-16 also enc 1 No written response required
KEPPLER.J 0 Region 3, Chicago. Office of the Director 80/06/37
B007390S90 Final deficiency rept re generic deficiencies In Cnrnor &
Lada, Inc pipe support suiay strut? Qnsite- insp &/or tests
uii 1 1 assure that assemblies are atce-ptflble fpr use Corner
Si Lada generic rept encl
PETRICK.N A Standardised Nuclear Unit Power Plant System
BO/07/24 9op
BOO719WM2 Ack receipt of B00606 (. 13 1 trs informing NRC of stops
taken to correct violations noted In IE Insp Rept
3O-483/8C-O9 on B004S3-S4
FIORELLI.D Region 3i Chicago. Reactor Construction d Engineering
Support Branch 00/06/30 lp
— BO0719OOO6 Reiponds to NRC B00314 Itr re violations noted in IE Imp
Rept 30- 4 S3 /SO -09 Corrective actions civil b mechanical QC
conducted training review sessions tu/insp personnel
BRYAN, J. K Union Electric Co BO/OA/06 4pp
— BO07130010 Supplement* 80O606 response to NRC BOQ914 Itr re violations
nuted In IE Insp Rept SO-4B3/BO-O9 Corrnctlve actions all
•afety-related surface-mounted plates Installed prior to
BO0901 will be relnvpected,
BRYAN.J.K. Union Electric Co BO/Oi/13 3pp
U Congressiunal/EiaLut ive Correspond s-nco
B0071 10916 Responds to QO051 fo Itr re delays In 01. application reviews
Full revi BIB schedules are being developed for licencing of
docketed applications Delays resulttil from TMI-2 a-codent
AHEAflNE.JF Commission BO/Oi/23 lp
— B007110353 Responds to B00516 Itr re delays in OL application reviews
Full Tevieiu schedules are being developed for licensing of
docketed applications Delays resulted from TMI-2 accident
AHGARNE, J F Commission BO/06/3,1 lp
— BOO711056(b Responds to SOOSli Itr re dclayn in OL application revleus
Full revieui schedules are being devclopod for licensing of
docketed applications Delays resulted from TM1-2 accident
AHEARNE, J F Cairanl ss Ion 90/06/93 lp
Reipand* to IE Bulletin 80-OB, "Exam of Containment Liner
Panetratlon Melds " Forwardi Apps D It E of Bechtel Power
Carp Bftc 104&6-H-203 providing d»tails re ueld jointii
pipe iMtl t lite for flutd head penetration assemblies.
BRYAN.J K. Union Electric Co HO/07/01 3pp
— BOO711056S Responds to H00316 Itr re delays in OL application reviews
Full Tevieu schedules are lining developed for licensing of
docketed applications Delays resulted from TM1-3 accident
AHEARNE, J F Commiasion BO/06/33 lp
8007190496 Ack receipt of BOO&06 Itr informing NRC of itups taken to
cornet violations noted In IE Insp ftupt 30-4B3/BO-12
FIORELLI.O Region 3i Chicagoi Re-actor Construction (< Engineering
Support Branch. BO/07/07 lp
B. Raportibli occurrtnceii LERi tt related corrDBpondence
B00714019B Ack receipt of 8O0616 interim d«rieieney rept re surface
Mounted platei Final rept uil 1 be revleued upon receipt
FIORELLI.O Ragman 3. Chicago. Reactor Construction fc Enaine«ring
Support Branch BO/OA/54 lp
— BOO7110371 Discusses concerns about delays m NRC revieui of OL
applications NRC failure to carry-out review in timely
manner Increases cost of electricity supplied to
c onst ituants
EACLETDN, T F , DAHFOHTH, J C , KASSEBAUM. N L Senate BO/03/16
4pp
0007380507 Responds to BO0930 Itr re assignment of NKC project manager
Cor facility b delay in NAC review of OL applications for
plants under const in HO Project manager JIBS been assigned
to facility Licensing delays rcaultiH from THJ-2
DIRCK8.M J Office of the Eiccutivo Director for Operations
BO/O7/07 lp
B00721004B Ack receipt of BOO&12 Final deficiency rapt re Bunker Rama
Carp electrical pen»tr«tlon assemblies Rept uill be revieuied
h Mvaluated.
CAHLBONiR T Region 1. Ph llidelphia. Ructor Operations Nuclear
Support Branch BO/OA/HB lp
DOCKET STN-3O-1B4 TYRONE ENCRQY PARK, UNIT 1
A Application/construction stage documents fc correspondence
BOO73 10231 Atk raolpt of BOO(.O6 interim deficiency rept re centrifugal
charging pump operation following secondary side high energy
Lin* rupture R«pt mill be reviewed l> evaluated
CAHL8ON.R.T Region 1> Philadelphia, Reactor Operations Nuclear
Support Branch BO/OA/S6 lp
BOO7070329 Dlicuivet BOO62D rept of potential deficiency re eicesilve
prtnurt in faeduater linns Following postulated high energy
line break, Encestlve prnsaurt does not constitute deficiency
par 10CFR90 S3*
PETRICK.N.A BtandardliBrf Nuclear Unit Pouier Plant Sy«tarn
OO/06/30 1 p
B0072 30001 Forwards statement of policy re requirements tft bit fli*t for
current OL applications, at derived from NUREO-0660 ft foi>rtd
In NUHEG-Q694
EISCNHUT, B 0 Divlslnn of Licensing B0/04/a6 2pp
0. Adjudicator^ rorrespondeaic e
H007O102S6 Fnruiards NRC SOOAli order roquiring licansea to snou cajse
uitiij CP should not be rovok edi since util Intends to can-cel
pro ject
DENTOM.H R Office of Ngt 1 car Reactor Regulation! Director
BO/O6/16 app
DOO72?Oa49 Aek receipt of BOO 61 a Itr ro pipe support sway strut
deficiency. Rapt e>pect*d by 300731.
CARLBON,R T R«ginn 1. Philadelphia. Reactor Construction b
Enfllnetring Support Branch BO/07/03 lp
— BOO701QH63 Order to slid ID cause uhy CP oftould not be revoked since
licensee intends to cancel project
DENTON.H R Office of Nuclear Reactor Regulation. Director
80/06/16 3pp
— BO078702M Confirms 800611 t»lcon req.uestlnfl uitoniion until B00731 to
•ubMlt rapt of signlficiint deficiancu r* pipe support iwsy
•truts.Addl time requirad for further engineering
• Kanination Ic study
BEIHENiB J. Standarriiivd Nuclear Unit Power Plant System
BO/06/ 12. lp
BO07O10272 Grants 790819 request that CP bo revoked because of
license* decision to cancel project Forwards NRC OQ0416
order that licensee shaui cause luhy license should not be
revoked
DENTON.H R Offico of Nuclear Reactor Regulation. Director
Ip
B007310297 Ack receipt of BOQiSQ final deficiency rept re postulated
feedwater Una piping break
CABLBON.R.T, Region 1, Philattelphio, Raactor Construction fc
Englnevrlng Support Dranch BO/07/11 IP
— B0073 10302 Deficiency repfc ra postulated fiedwater line piping break
Eicetiive peak pretiure calculation* performed by D«cht*l
considered part of normal design evolution Does not con aider
Matter reportablB per 1OCFR30 55(et
PETHICK.N A Btandardiied Nucloar Unit Pou»r Plant System.
BO/Oe/30. lp.
BO07Oaooai Proposed findings nf fact tc cone lualqns oP lau responding to
ABLAB questioni on Oattello rept Findings are adapted bij ,
TMI-a/Peaclibottont Intervenors li Ecology Action Urges
suspension of OLs Certificate oP Svc cue)
KEFFDHD.C EnvJronuipn tal Coalition on Nuclear Power aO/Oi/iS
12PP
B007O70310 Forwards re»ponse to NHC H0061A Itr !< order to- show cause
uihij Licence CPPB-1 b7 •bhauld' not hp revoked No objectinn
ral sed
BAXTER,! A Shaw. Plttmon, Potts !, TfnwbridgB BO/07/01 lp
300
DOCKETED ITEMS
— 9O07O70313 Response stating no objection to H00616 to order to show
cause why License CFPFi-197 should not be revoked
BAXTER, T A Northern States Pouier Co BAXTER, T A Shau, Pittman
Potts & Truujbrirfge 80/07/01 Ip
B007310615 FnrLjards IE Info Notice BO-2A, "Evaluation of Contractor
OA Programs " No written response required
CRIER, B H Rogion 1, Philadelphia, Office op the Director
BO/06/10 Ip
BO 07 150 475 Ack receipt of NRC BOD616 !tr tu/encl sliou cause order Issued
to applicants Pnonie number Ic neiu address submitted for
f urtFi er correspond ence
IHRIO, P. Badger SaFe En-ergs Alliance, Inc 90/07/07 Ip
B007160367 Forwards IE Info Notice B0-27i "Degradation of Raactor
Coolant Pump Studs " No specific action or response
required
QRIER.H H Region 1, Philadelphia, Office of the Director
00/06/11 Ip,
B0071SO-J9a Petition for late intervention & motion to defer revocation
of CP Cancellation oF unit will have substantial !. tiejative
impact on present * future electric interstate market due to
being integral part of development Certificate of Svc end
FRANCIS, F E South Dakota. State oF FRANCIS.F E North Dakota,
State at FRAHC1S,FE Spiegel fc McDiarmid BO/07/11 9pp
BO07S5OAOB Response in opposition to Dakota Commissions' 600711 motion
to defer action on petition tn intervene re B00616 order to
«hou> cause Commissions did not actually request hearing b do
nut have requisite interest Certificate of Svc enc 1
BAXTER. T A Northern Status Pouer Co BAXTER, T A Shau, Pittman,
Potts & Trnwbndge HO/O7/23 Bpp
90O7S9O7O3 Comments in opposition to Dakota Commissions ' 600711
untimely motion to intervene Petitioners failed to assert
Interest NRC has no jurisdiction CP should be revoked W/
certification of svc
OAUAZEN, T Northern Thunder HO/O7/23 2pp
I Financial information
8007010421 Annual Rept 1?79
* Cooperative Poupr Association
79/12/31 29pp
DOCKET STN-50-4BS 5TERLIN3 POWER PROJECT NUCLEAR, UNIT 1
A Application/construction stage documents fc correspondence
B007230001 Forwards statement of policy re requirements to be met for
currant 01. appl icati ons, as derived From NUHEG-0660 i found
in NUREO-OAfl
EI-BENHUT.D G Division at Licensing 60/06/26 2pp
Q Adjudicatory correspondence
BOQ7DBQOB6 Proposed findings of fact tt conclusions nf lay responding to
ASLAB questions on Dattelle rept FlndinQS arc adopted by
TMl-ff/PeachbottDm Intervenors t, Ecolojg Action Urges
suspension of OLs Certificate of Svc enc)
KEPFDHD,C Environmental Coalition on Nuclear Power BO/06/1B
12PP
BOO72aOil9 Forwards IE info Notice HO-28, "Prompt Reporting of Info In
Accordance U/10CFR3O S5te> " No written reapon»B required
DRIER, D H Region 1, Philadelphia, Office of the Di rue tor
BO/06/13 Ip
Q0070a037S Respdnds to IE Bulletin BO-09, "Hy drama tar Actuator
Deficiencies " Tuo safety-related uses of ITT General
Controls Models AH-70 ti NH-9O seriBa hydramotov »ctuotor»
have been identified ITT is testing, actuators
PETRICK.N A Standardlieif Nuclear Unit Pouor Plant SyBtan
BO/06/ 16 Ip
800703030B Forwards IE Circular FJO-1S. "Loss of Reactor Coolunt Puop
Cooling t. Natural Circulation Cool down " No written rvipona*
required
GFilER-B H Region 1. Philadelphia, Office of thi Director
BO/OA/20 Ip
BOQ7160744 Forioards IE Circular BO-14, "Radioactive C on t«mi nation of
Plant Demlneraliied Mater Eg 5 (, Resultant Internal
Contamination of Personnel " No written rettpanae required
OHIEFt'Q H Region 1, Philadelphia, Office of the Director
SO/06/24 Ip
8007210334 Foruards IE Info Notice BO-24, "Loui Level riadu*»t» Burial
Criteria " No written response required
ORIER.B H Region 1, Philadelphia, Office of the Director,
BO/06/25 Ip
B0072301SO Forwards IE Bulletin BO- 16, "Potential Misapplication of
Rosemount Inc Models 1191 fc 113S Presaure Transmitters
H/Either A or D Output Codes " Written response required
IE Circular SO-16 also end No written re«ponie roquired
ORIER,11 H Region 1. Philadelphia, Office of the Director.
BO/06/37 5pp
S ReportablE occurrences. LERo d related correspondence
BO07S1023I Ack receipt of B006O6 interim deficlencii r»pt r> centrifugal
charging pump operation following secondary side high enertiii
line rupture ftept ulll be revloued & evaluated
CARLSON, [i T Region t, Philadelphia, Reactor Operations Nuclear
Support Branch BO/06/56 Ip
60 070 BOO 4 ib Response to AELAQ request re Deficiency 1 Urges reversal of
decision rejecting deficiency re correlation between (I mine
radon releases t amount of U fuel Portion of Perkins
decision re correlation must be vacated
CAPLAN, R Ecology Action Of Osuego BO/06/30 2pp
B0070B004H Proposed findlnos of fact endorsing Citiiens For Safe
Environ filing TB radiation source terms from U mining &
milling Rejects Perkins rationale it urjes development of
further evidence re failure mechanisms it human factors
CAPLAN. R Ecology Action of Osuiego 90/Oii/2O flpp
B007070323 Discusses 800620 rent of potential deficiency re axcotilvi
pressure in feeduater linaa following postulated high energy
line break Eicessive pressure does not constitute deflclencu
per 10CFR50 S5e
PETRICK.N A Standardized Nuclear Unit Power Plant System
80/06/30 Ip
0007310397 Acl receipt of BO0630 final deficiency rept re postulated
feedwater line piping break
CARLSON, R T Region 1, Philadelphia, Reactor Construction &
Engineering Support Branch BO/07/11 Ip
Q Inspection reports. IE Bulletins S< correspondence
B007O102&8 Forwards IG Info Notice BO-23, "Loss of Suction to Emergency
Feeduater Pumps " No written response required
CRIER, E) H Region 1, Philadelphia, Office of the Director
BDJ 05/29 Ip
— S00731030S Deficiency rept re postulated feeduatvr line piping break
Eicessive peak pressure calculations performed bu, Dechtvl
considered part of normal design evolution Does nut consider
matter reportable per 10CFR30 SSle)
PETRICK.N A Standardiied Nucloar Unit Pouier Plant Bustern,
BO/06/30 Ip
3007010142 Responds to IE Bulletin 79-2B< "Possible Malfunction of
hMMCO Model EAtaO Limit Suttches at Elevated Temps " Top
cover gaskets on switches w/app 1 ! cabl e date codes lull] be
replaced on valves listed in encl
PBTfilCK.N A Btandardlied Nuclear Unit Poiuer Plant System
BO/Oi/02 Spp
S00710044I Responds to IE Bulletin 80-05, "Vacuum Condition Resulting
in Damage to Chemical Vol Control Sys iCVCS) Holdup Tanks "
8MUPJ*S recycle holdup tank* do not depend on pressure
regulator's to compens-ote for level variations
PETRICKfN A Standariiiied Nuclear Unit Power Plant System
BO/04/O& 3pp
DOCKET BTN-SO-flH6 CALLOMAY PLANT, UNIT 2
A Application/construction stage documents (• correspondence
B007a5004t Summanj of B00401 meeting u/util in BethBsda.MD re review
plans for utils DL applications
LICITRA, E A Licensing Branch 3 EJO/04/29 Spp
B007100371? Foriuards Bechtel rept BLWE-700 (. Daniel Intl Corp BQOSZf
telcon record sheet !. QC Procedure QCP-307, Revision S, per
NRC BOO 5 39 request for add) info on embed rept Number of
embeds involved to be determined by Jul 19SO
8CHNELL.D F Union Electric Co, 80/06/17 lOpp
DOCKETED STEMS
BO0723OOO1 Forwards abatement of policy re requirements to be
currant OL apf 1 icationsi a s. derived from NUR^S-OAtO d Found
in MUREO-OA94
0 Division of Licensing BO/0&/Z& 2pp
— BO0730Q54& "Architectural Control 6 Diesel Qen&rstcr Bids* fc
Communication Corridor. F I oor P 1 ans, Elev-a tioni 2,032 !, 2, O47
Ft "
* BechtBl Corp lQ4bt> 79/04/04 Ip
BOO73OO337 Forward* Union Electric t< HS Gas 81 Electric reipnnieii to
WtC questions re facility design tt const QA program* Revised
HA pronra»i Incorporating util com-mi tment* & agreemeittBi uf 1 1
be «vnil*bl» uithlt) =70 d«(js
BE I KEN, 6 J Nuclear Power Plant Standards Cnmmittee 8O/O7/8B
BOQ73QO91 1 Forwards Info & drawing* re Category 1 masonry ualls. in
raaponse to BOQ7S1 Ifcr Calculations end
PETRICK.N.A Standardized Nucloar Unit Pauior Plant Sustain
BO/07/29 79pp
— SQO73QQ347 "Arthitoctural General Masonry Details "
* Bochtel Corp lOIAd HO/01/3B ip
—800730054^ "Architectural Control Bldg f. Communication Corridor Flo
Plan. Elevations 2, O73 Ft. 4 IncliPB !< Hoof PI an, E 1 cvatlon
2.OQ7 Ft. 2 Inches "
* Becfttel Corp 1O4&6 79/04/04 Ip
— HOO73OO5S1 "Architectural General Masonry Details "
* Bechtel Corp lO-Jti 71SIQ/33 If
-HO0730O914 "Areli it*ctural rtusiliarij b RcaclDT- Bldg Floor Plan.
EUvafcion 1-974 Ft "
* SBthtal Corp. 10466. 79/01/O4 Ip
— BO073O0594 "Architectural Atcess Control Floor- PI on, El ovotl on 1 1
Ft "
* Bschtol Corp lOflAi 7B/08/a9 Ip
-B007300317 'Arth tt»ctur»l
Elevation 2. OOO Ft "
• Bachtal Corp
uiillarij fc Reattor Bltfo Floor Plan.
79/O4/04 Ip
— BOO730059i "Arc Mtec turd 1 Access Control & Control Unom Ar»n». 1 nttri
Elevations "
•• Btchtel Corp 1016& 79/0-1/19 Ip
— 8007300520 "Architectural Auxiliary & Reactor Dldg Floor Plan.
Elevation 2. 02i Ft "
• Boc)it«J Corp 10-166- 79/11/O3 Ip
— B007300559 "Art h i tec tural Control 31dg t. Communication Corrldon
rtiscaUaneous Details t Stairs C-2. CC-2 tf CC-3 "
» Bachtel Corp lOlifr T^/Oa/O? Ip
— -0007300921 "Architectural CHU Mall Penetrations,. Au»i lary Dldg
• Bachtdl Corp 10-466. 79/04/14. Ip
— B00730036B "Artti i tec tural Hot 1-ab Entiipmont S, Furniture Layout.
Elevations & DctoUs.Elevat ion 1,904 Ft "
» Bechtel Corp I04i6- 7H/O9/13 Ip
— B0073O099Z •ArcMtBcturAlrAunillarv; & Rnactdr Dldg Floor Plan,
Elevation a, O47 Fti 4 Inch** "
» Bach**! Corp 1O46A. 79/04/O4 Ip
~-BO073003a4" "Architectural CMU Hall Penitra tlon«, Control Bldg. "
* Bachtvl Corp 104&& 79/08/1? Ip
— BOO73OO326 "Architectural Auxiliary & Reactor Bldg Floor Plan*.
ElBV»tioni 1,988 Ft, 1,989 Ft h H.O13 Ft,i Inches "
* fl«cht»l Cora. LO4&6 79/O4/O4 Ip.
— BO073OO93S "Arch 1 t«e tural: ChV Hal 1 Pen»tratlon«, Control Dldg It
CoMxunicatlan Corridor "
* B*cht«l Corp 1D4A6 00/01/53 Ip
— BOu73C0964 "Arch i tec lura 1 Computer Boom t. Control Room DrtailBd Flat
Plans, Elevation 2.047 ft, 6 Inches "
* Buchtel Carp lOfliA BO/01/2S Ip
— a0073005ii& "Architectural Control Dlds-Stair C-l
* BechtBl Cnrp ifffl&A 79/06/3-1 Ip
"Architectural Communication COTT idor, Stoir CC-liPlan* 6
Beet Ian "
* Beclitel Corp 10466 BO/01/07 Ip
— 8007300570 "Architectural Elevator I Commun icat i on Corridor Plan*.
Sections A Details "
-« Bechtel Corp 10466 B0/02/2ib Ifi
— BO073OOSQV "ArcMtBcturnl flu«lli«rij BldgPBtalr& A-l & A-1A, Plans &
Bac-tiQlu. "
« Bachttl Carp IO466 7S/10/O4 ip
— BOO730OS33 "Archi tsc tural CMU Wall Penetration, Control Eldg i
CoMiintcatlon Corridor "
* B»eht»l Corp IO4A6 7W03/E7 Ip
— BOO73O0934 "Ar chi toe tural Auxiliary Bldfl,etair A-2, Plana & B*ctlon»
• Btchttl Carp 1O166 78/10/04 Ip
— 800730O533 "Architnctural CMU Wall Ponetrat Ions, Control Bldg &
CoMiifnic'tf un Corridor, "
* Dtchtrl Corp 10464 80/03/13 Ip
F Security, m»dicalr cmergencij f< fir? protection plans
HDO719D334 Informs that guard training plan requlre-d bij 10CFH73, flpp D,
uill be submitted by 8011O1
K Union Electric Co BO/07/OB 2pp
0 Ad judicatory corrBspuniJen.ee
BO07310S43 Foruardg Commission {100927 msmnrnndum & order containing
decisions on UCS 7HOSOa patitlan for ret ona 1 deratt on aF
730413 memoraniltiiit & order UCS 7711O4 petition sought action
rs fire protection For electrical cables
EISENHUT, D C Division of Licensing aO/Oi/aS B9pp
BOO7300336 "Architectural Auxiliary Bldg, Et »vatora. Plana
* Bicht»l Carp 1O166, 78/10/04 Ip
— B0073OO33B "Arc hltoctural CUM Wall Pene trat Ion*, Control Bltfn &
CoNMunlcfttlon Corridor. "
* Bechtrl Corp. 1O4&& 79/03/39 Ip
— BOO73O033? "Archt toctural CMU Mall Penetration*, Con trol Bldg t
Communication Corridor."
• B-ichtel Corp. 10446 60/03/08 Ip
--B0073O034Q "Arehitsctural Control !< Dteial Oanerator Bldgi h
Cammunlcji tlon Corridor. Floor Plan*, El»vat ions Ii974 ti 1.994
Ft. "
# Bflthtfl Carp. 1O4&6 7B/09/11 Ip
— B00730O342 "Architocturnl Control 6 DU»M Generator Dldgi b
Comnuntcation Corridor. Floor Plant, El svat i on* 3- OOO fc 2.O16
Ft, «
* Bethtal Corp. 1O466 79/04/O4 Ip
— QO07300543 "ArcNl t*c tural CMU Mall P>no trationB, Control Bldg,
Communication Corridor & FtaiTuaitB Bldg "
•» B*cht*l Carp 1O4&6 BO/03/1B Ip
correspondence
BO07290OB5 Rasponds to 3003^8 1 tr From Lfluiian, HO strtool atud«nt« bo
President Carter re adeq,uacg of qua 1 1 f i c at ions of oorianncl
<fesioninu plant Cartjjin design activities failed to moot
MRC requirements Util corrective ottions under rovtoui
D1KCKB.M J Office aF tht) Eimcutlva Director fov Operations
BO0725-007O RcsponifB to vnc 1 BOOS 04 I tr to President. Carter re nuclear
»neray Use of both coal fc nuclear pouior necessary to free IfS
of- overdependence on Foreign oil President Carter 791207
preEd relca-ae Si Briergy plan encl
DENTON.H R Office of Nuclear fteoctnr Regulation, Director
SO/Oti/27 E3pp
0 Inapcction rBports> 1C Dulletlns it correspondent e
B00721O401 Forwards IE Circular 90- S3, "Or- id Strap Damage In
MBS t Inghouse Fuel AssttmbliBB " No urltte-n rBspon-tB rnqulred
KEPPLER.J Q Refllon 3, Cliica^o, Office of tho Director BO/OS/SB
IP
302
DOCKETED ITEMS
B00701O123 Forwards. IE Info Notice 3O-23. "Loss of Suction to Emerge net)
Feeduater Pumps " Mo written response required
KEPPLER.J G Hegion 3. Chicago, Office of the Director BO./O5/29
IP
Q00701OIQ2 -Responds to IE Bulletin 79-33, "Possible Malfunction Of
NAM CO Model FAiaO Limit Suite he 5 at Elevatad Temps " Tap
cover gaskets on switches ui/app 1 tcob le date codes mill be
replaced on valves listed in encl
PETHICK.N A StandardliBd Nuclear Unit Power Plant System
BO/O6/O2 Bpf
BOO7070335 Discusses 800630 rept of potential deficiency re oicessivo-
pressure in fpoduiater lines Following postulated high energy
lino break Eitoaslve pressure doe* not const i tut* deficient!)
per 1OCFR50 93e
PETHICK.N A atandordiied Nuclear Unit Power Plant System
BO/Q6/30 Ip
BOO7 290245 Ack receipt of BOO&12 Itr re pipe support sway ttrut
deficiency Rent eipected by 800731
CARLSON, R T Reg ion 1. Philadelphia. Reactor Construction fc
Engineering Support Branch GO/07/03 Ip
8007100441 Responds to IE Bulletin, BO-OS. "Vacuum Condition Resulting
in Damage to Chemical Vo 1 Control Sya ICVCSJ Holdup Tanks "
SNUPPS recycle holdup tanks, do not depend on pressure
regulators- to -compensate for level variations
PETRICK, M A Standardised Nut 1 ear Unit Power Plant System
£30/06/0,6 2pp
— D007H9O2B4 Confirms QOO611 telcan requB>tln|| extension until 800731 ta
submit rept of sign IP leant deficiency rt pipe tupport (Uau,
struts. Addl lima re-quired for further engineering
^lamination k study
SEIKEN, B J Standardised Nuclear Unit Pouler Plant Byste«
BO/06/12 Ip
BOQ7SS0522 Forwards ]E Info Notice SO-26. "Evaluation of Contractor
Qrt Programs " Ma written response required
KEPPLEft, J Q Region 3, Chicago. Office of the Director BO/06/10
B00731O297 Ac k receipt of 800630 final deficiency rept ra postulated
f eedu-atnr line piping break
CARLSON. R T Region 1. Philadelphia, Reactor Construction t
Engineering Support Branch BO/07/11 Ip
flOD71i,O300- Forwards IE Info Notice BO 87. "Degradation of Reactor
C-uQlant Pump Studs " No specific action or response
retired
KEPPLER.J 0 Region 3, Chicago, Office oP the Director BO/06/1 1
B007aaD62B Forwards IE Info Notice 80-2B. "Prompt: Reporting Of Info In
Accordance W/10CFR50 55 ( e ) " No written response required
KEPPLER.J 0 n-egion 3, CKicagn, Office of the Director BO/06/I3
B0070aO37B (lespanila to IE Dullotin BO-09. "Hgdratnotor Actuator
DeficienciBS " Tuio saffetg-rel a ted uses of ITT Sonera 1
Control! Models AH- 90 & NH-90 series- hydramotor actuators
have been identified ITT is tasting actuators
PETR1CK.N A Standard! led Nuclear Unit Pouer Plant System
BO/06/16 !fi
Q0070SD570 Foruards IE Circular BO- 15, "Losa of Reactor Coolant Pump
Cooling b Natural Circulation Coo Id own " No written response
required
KEPPLER.J O Fiegion 3, Chicago, Office oF the Director BO/Oi/20
IP
S00717O51B Forwards IE Circular BD-14. "Bad inactive Contamination of
Plant ]}emine>fll iied Wat-er Sys fc Resultant Internal
Contamination of Personnel " ND ui-itten response required
KEPPLEn.J 0 Region 3. Chicago, Office or the Direct 01- 80/06/E4
Ip
600 7 3303 4 3 Forwards IE Bulletin GO- 16, "Potential Ml sappl Icat Ion of
Rosemount Inc Mdd*la I 1S1 t, 1 1 5H Pressure TranHtni tters
^/Either A or D Output Codes " Written response re-quired
IE Circular QQ-I& also encl No written response required
KEPPLER, J Q Region 3, Chicago. OPPice of the Director BO/06/27.
B007BI019S Respond* tn IE Hull&tin BO-OB- "Enam of Containment Linsr
Penetration Uald-a " ForuiardB Apps D d E of Dechtel Power
Corp Spec 10466-H-303 providing details re ueld joints,
pipe matl t s-i IB for f 1 ued head p&netratio-n aBtembllni
BRYAN, J K Union Electric Co 90/07/01 Spp
— BO073103Q2 Deficiency rapt re postulated feadwater line piping brea
Eicesslve pasV pressure calculations performed by Bechtcl
considered fart of normal design evolution Does not consider
matter reportable per 10CFR5D 55Ce>
PCTRICK.N A atandardiied Nuclear Unit Pouer Plant Syitin,
BO/O6/30 tp
BOO7350336 Intonm deficiency rept re out-of-tolerance conditioni on
major holt & minor nut diameters for mat Is supplied by
Industrial Mechanics, Inc Inup program established fc
equipment an order Final rept eipncted by BQ1Z01
DRYAN.J K Union EUetric Co BO/07/1B Ip
B007S70990 Final deficiency rept re generic deficiencies in Corner |c
1_ada, Inc pipe support suay struts Onslte insp fc/or t**t«
will assure that osae-mbl ies are acceptable for use Corner
& Lad a generic rept encL
PETRICK<N A Standardlled Nuclear- Unit Pouer Plant SijittM
BO/07/24 9pp
U CongrosHional/EiotutivB CorreBpondence
8007110546 Responds to BOOSlci Itr re delays in OL application revieui.
Full revieui schedules are being developed far licensing at
docketed applications Delays resulted from TMI-2 accident
AHEARHEiJ T. Commission BQ/Qb/33 Ip
~ B007110SS3 Responds to 800516 Itr re delayi In OL application nvit«i,
Full revinu schedules are being developed for licensing of
docketed applications Delays re»ulted from TMI~a accident.
AHEftRNE, d F, Commission BO/06/23 Ip
--BO07110966 Responds to BOOS 1 6 Itr re delays in OL application revl*ui.
Full review schedules are being developed for licensing of
docketed applications Delays resulted from TMI-3 accident
, J F, Cc.mmit.lon BO/06/23 Ip
— BO071105AB Rueponds to B00314 Itr re delays in OL application revliui.
Full review schedules are being developed for licensing of
docketed applications Delays resulted froin TMI-2 accident
AHEARNEi J F Commission QO/06/23 Ip
B Rep-ortablB nccurpenccs. LCRa & related correspondence
B00711O19S Act rectipt of 300416 interim deficiency rupt rn surface
mounted platws Final rept ulll be ravieuieil upon receipt
FIDRELL1.O Region 3i Chicago, Reactor Construction Et Eng innering
Support Branch BO/OA/54 Ip
fl007at004B Ac* receipt of BOO613 final o>f le i &ncy rept re Bunker Ramn
Corp electrical penetration assemblies Rept uiill be reviewed
h evaluated
CAKLSON.R T Region 1, Philadelphia, Reactor Operations Nuclear
Support Branch 80/06/23 tp
— B007110571 Discusses conc»rn« about delays in NRC r«view of DL
appllcatlons NRC failure to carry-out ravltu in timely
manner Increases cost of electricity supplied to
con-sti tuents
EAffLETON, T F . DOLE, R Senate SO/03/1& 4pp
BOO7BB0509 Responds 'to BOOS30 Itr re asoionment of NRC project mamgir
for facility t delay in NRC review of OL applications far
plants under const in MtJ Project manager has bean assigned
to facility Licensing delays resulted from TMI-2.
OIRCRB.U J Office o-f the Executive Director for Operations
BO/07/07 Ip
9007210331 Acfc receipt of BOO606 interim deficiency rejt re centrifugal
charging pump operation follouilug secondary side high energy
line rupture Kept till 1 1 he TBViewod & evaluated
CARLSON, B T Region 1, Philadelphia. Reactor Operations Nuclear
Support Branch BO/Oo/BA IB
DOCKET STN-SO-4B8 PERKINS NUCLEAR STATION, UNIT 1
A Appl ication/conEtruc tion stage documents fc correspondence
0007330001 Forwards statement of policy re requirement* to be met for
current OL applications, as derived from NUREG-OeiibQ l< found
In NUREO-0(b94
EISENHUT.D 0 Division of Licensing BQ/Q&/26 Spp
DOCKETED ITEMS
303
O Adjudicator^ correspondence
BOO&20O066 Forwards Pages 4, 5 & 6 uihlch were inadvertently omitted
from Eihlblt A of High Rack Lake Association B0052I
affidavit
SPRINGER, D High Ruck Lade Association GO/05/23 Ip
— QO06200071 Pages 4, 5 b 6 for E.hlbit A of High Rock Lake Association
BO0921 affidavit
8PHINQER.D High Rack LaVe Association 7B/11/I6 4pp
BO07310B43 Forwards Commission 8QQ327 memorandum & order containing
decisions on UCS 7BQ3OB petition far reconsideration of
780413 memorandum & order UCS 771101 petition sought action
re fin protection for electrical cables
EIBENHUT, D 0 Division of Licencing BO/06/25 B9pp
B00733022B Forwards IE Dulletin BO-ld. "Potential thsapp 1 ication of
Rosemount Inc Models 1151 t, llbS Pressure Transmitters
W/Elther A or D Output Codes " Uritten response required
IE Circular BO-16 also end No written response required
O'REILLY. J P Region 2, Atlanta, Office of the Director 80/06/27
BOQ7230532 Forwards response la IE Bulletin BO-OS, "Ciam of Containment
Liner Penetration Welds " Piping penetrations are designed
t, fabricated in accordance u/1977 edition of ASME Boiler fc
Pressure Vessel Cude. including Summer 1977 addenda
DAIL, L C Duke Puuer Co 80/07/07 6pp
DOCKET STN-30-4B9 PERKINS NUCLEAR STATION, UNIT 2
A Appl ication/construc tion stagi- documents ', correspondence
B007Q20473 Request for 30-day eitenslon to file brief in support of
D Bpringor BOO419 petition to intervene t. request for
hnaring Certificate of Bvc encl
SPRINGER. D Affiliation Unknoun 80/06/27 3pp
BQO7230QOI Forwards statement nf policy re riiHUiremantE to be met for
current DL appl ications. as derived from NUOEO-OiiO !e found
In NUREG-0694
EI5ENHUT, D 0 Division of Lirensini) BO/Oi/26 2pp
B007D30243 Huppl uithdrauing argument presented In NfJC B00636 response
in opposition to Intervenors ' motion to reconsider or reopen
record Untimely filing li no longer asserted per ALAB-397
but nation still fails to meet stds Certificate of Svc encl
BARTH, C A Hearing Branch 3 80/07/01 4pp
0007090311 Comments on D Springer 800931 affidavit advancing Lake
Nornan ai beat site in proceeding Adheres to prior position
for denial stated in NRC BOO 5 03 response to D Springer
BQO413 petition Certificate of Bvc encl
BAHTHiC A Hearing Branch 3 BO/07/08 4pp
B007I1034B Order granting 20-day extension for Springer to file brief
In support of BQ0413 petition Eitension begins upon receipt
of NRC B0070Q response to Springer affidavit Filed in CP
proceeding
BOWERS. E 8 Atomic Safety and Licensing Board Panel BO/07/09 lp
0 Inipection reports, IE Bulletins (< correspondence
8O0724Q139 Forwards IE Info Notice BO-20, "Loss of Deta(j Heat Removal
Capability at Davis-Bnase Unit 1 Uhile in Refueling Mode "
No re«pon«D required
D'FtEILLV, J P (Its ion 3' Atlanta, Office of the Director QO/OS/OB
0 Adjud icatorg correspondence
BO073IOS43 Forwards Cummission 900527 memorandum !. order containing
dacieions on UCB 7BO502 petition for reconsideration of
7BCM13 memorandum t< order UCS 771104 petition sought action
re fire protection fnr electrical cables
EISENHUT.D 0 Division of Licensing BO/06/23 S9pp
B007O20475 Request for 3O-daij eitonsion to file drief in support of
D Springer &DO41S petition to intervene >i request fnr
hearing Certificate of Svc enc 1
BPRINOERrD Affiliation UnVnouin BO/06/27 Bpp
BO 0703 024 3 BuppI withdrawing argument presented in NRC BQ062& response
In opposition to intorvenors ' motion to reconsider or reopen
record Untimely filing is no longer asserted per ALAQ-597
but motion still falls to meet Btds Certificate of Svc end
BARTH, C A Hearing Branch 3 BO/07/01 4pp
B007090311 Comments on D Sprinaer B00531 affidavit advancing Lake
Norman as best site in proceeding Adheres to prior position
for donlal stated in NRC B00505 response to I) Springer
B00418 petition Certificate of Svc encl
DARTH. C A Hearing Branch 3 BO/07/08 4pp
O007210439 ForuiHrd« IE Circular BO-13, "Grid Strap Damage In
Heitlnghouse Full Asiembliei " Mo written response required
O'REILLY.J P Hnglon 2. Atlanta, Office of the Director 80/03/38
lp.
800711034B Order granting 20-day eitension for Springer tn File brief
in support at B00413 petition Eitension begins upon receipt
of NRC B 00703 response to Springer affidavit filed in CP
proceeding
BOWERS, E 8 Atomic Safety and Licensing Board Panel BO/07/09 lp
•BO070101BB Forward* IE Info Notice BO-H3, "Loss of Suction to Emergency
F»d*»te,r Pumpt " No uritten response required
Q'REILLY.J p Region S. Atlanta, Office of the Director 80/05/29
B007Z200M Forward* IE Info Notice BO-26, "Evaluation of Contractor
QA Program " No written response required
O'REILLV.J P Region 2. Atlanta, Office of the Director 00/06/10
2pp
BQO716O23O For-Hardi IE Info Notice 80-27, "Degradation of Reactor
Coolant Pump i Stud* " No ipaclfic action or response
required
O'REILLY, J P Region 3, Atlanta. Office of the Director QO/06/11
Ip.
8O07S9D3&B Forward I IE Info Notice HO-2Qi "Prompt Reporting of Info in
Accordance M/IOCFRSO 33(e) " Ma uritten response required
D'fiElLLY.J P Rejion 2, Atlanta, Office of tlie Director BO/06/13
2pp
8007020449 Forwards IE Circular BO-15, "Loss of Reactor Coolant Pump
Cooling & Natural Circulation Cooldoun " No written response
required,
O'REILLY.J.P Region 2, Atlanta, Office of the Director BO/06/20
lp *•
BQQ717Q096 Forinards IE Circular 80-14, "Radioactive Contamination of
Plant Denineral lied Water Byi b Recultant Internal
Contamination of Personnel " No uritten response required
D'REILLY.J.P Reaion H. Atlanta, Office of the Director. 80/06/24
lp
0 Inspection reports. IE Bulletins It correspondence
BQQ7340139 Forwards IE Info Notice BO -SO, "Loss of Decay Heat Removal
Capability at Davis-Dense Unit 1 While in Refueling Mode "
No response required
O'REILLY.J P Region B, Atlanta, Office of the Director BO/OS/OB
3pp
8007210439 Foruards IE Circular BQ-13i "Grid Strap Damaje in
WEstlnghouge Fuel Assemblies " No uritten response required
O'REILLY, J P Region 2, Atlanta. Offiro of the Director BO/05/2S
B0070101B8 Forwards IE Info Notice SO-23, "Loss of Suction to Emergency
Feeduator Pumps " No uritten response required
O'REILLY.J P Region 2, Atlanta, Office of the Director 00/03/29
B007S200S4 Forwards IE Info Notice BO-26. "Evaluation of Contractor
QA Programs " No uritten response required
O'REILLY.J P Region 2, Atlanta, OFflLB of tno Director BO/06/10
Hpp
B 007 160230 Forwards IE Info Notice 80-37. "Degradation of Reactor
Coolant Pump Studs " No specific action or response
required
0'REIl.LY-J P Region 2. Atlanta, Office of the Director BO/O6/11
IP
8007280368 Forwards IE Info Notite BO-28. "Prompt Reporting of Info in
Accordance W/1QCFH30 55(e) " No written response required
O'REILLY, JP Region 2. Atlanta. Office ef the Director BO/06/13
2pp
304
3007020^45 Forwards IE Circular 80-13, "I
Cooling & Watural r i r dilation Cooldnun
required
O'FIEILLV.J P Region 2, Atlanta. OFfn
IP
oF Reactor Coolant Pump
o lurittpn response
it the Directc
800717009A Foruards IE Circular BO-14, "Radioactive Contamination of
Plant Denineral i red Water Sys Ji Resifltant Internal
Contamination of Personnel " No written response required
Q'REILLV.JP Region 2, Atlanta, Office oP thfr Director BO/04/24
IP
8OO723022Q Forwards IE Bulletin BO-16, "Potential Misapplication of
Rosemount Inc Mndels 1151 ». 1152 Pressure Tramsmi tiers
W/Either fl or D Output Cotfos " Wntter. response required
IE Circular BO-iA also encl No written response retluired
O'REILLV, JT Region 2, Atlanta, Office of the Director BO/06/K7
IP
BOO/250532 Foruard* response ta IE Bulletin BO-aO, "&*am of Containment
Liner Penetration Uelds " Piping penetrations flra designed
6 fabricated in accordance u/ 1 977 edition of ASME Boiler i
Pressure Vessel Code, including Summer 197? addenda-
DitlL.LC Dule Poiu&r Co 8O/O//07 App
DOCKET STN-BO-fJO PERKIHB NUCLEAR STATION- UNIT 3
A App IxcdtiDn^CQn&trucbbon stage documents ft torr
S0072503i.B Forwards IE Info Notice 90-2B, "Prompt Reportinj of Info In
Accordance W/10CFR50 3S(e) " No uiritten response required
O'REILLY.J P Region 3, Atlanta. Office of tho Director 00/06/13
3pp
HOO7oa0443 Forwards IE Circular 60-15. "Loss of Reactor Coolant Pu«p
Cooling fc Natural Circulation Cooldown " No written renpon»«
Q'ftEILLY.J P Region 2. Atlanta, Office of toe Director 80/06/30,
IP
QOO717O09A Forwards IE Circular SO-14. "Radioactive Contamination of
Plant Demineral tied Water Sija t Resultant Internal
Contamination of Personnel " No written response required
O'REILLY.J P Region 3. Atlanta, Office of the Director HO/06/34
IP
B00723O33B Forwards IE Bulletin 00-16, "Potential Mi »app 1 ic«tl on of
Roscmnunt Tnc Models 1151 & 1152 Pressure Transmitters
W/Either A pr D Output Codos " Written response required
IE Circular BO-16 also enc 1 No written rosponne required.
D'REILLV.J P Region 2. Atlanta. Office of the Director BO/Ot/27,
ip
BOO725Q533 Forwards response to IE Bulletin BO-OB. "E«am of Containment
Liner penetration Welds " piping penetrations are designed
b fabricated in accordance w/l?77 edition of ASME Boiler &
Pressure Vessel Code, includ ing Bummer 1777 addenda
DAIL, L C ])uke Power Co 80/07/07 6pp
8007230001 Forwards statement of policy re requirements to be met for
current OL appl i cations, as derived from NUREG-066O & found
in MJREe-0694
EfBENflUT. B C Division oF Licensing SO/Q6/2A app
DOCKET STN-SO-491 CHEROKEE NUCLEAfl STATION, UNIT I
A Application/construction stage documents & correspondence
O Adjudicator^ correspondence
BOO7020475 Request for 30-day ertension to file brief in support at
D Springer BC04I5 petition to intervene E< request for
hearing Certificate of Svc enc 1
SPRINGER, D Affjl iation Unfcnoun BO/0 6/27 2pp
BOO703Q243 Suppl withdrawing argument presented tn NRC BOQ636 response
in opposition to intervenors ' motion to reconsider or reopen
record Untimely Filing S3 no longer asserted per ALAD-597
but motion still Fails to meet stds Cert i Ficat p of Svc end
BARTH.C A Hearing Branch 3 BO/07/01 -Jpp
BOO7090311 Comirients on D Springer 600521 affidavit advancing Late
Norman as -best site In proceeding Adheres to prior position
for denial stated in NRC B0050S response to D Sprlngc-r
800415 petition Certificate of Eve end
QAHTH,C A HeariTig Branch 3 BO/07/OB 4pp
3007110348 Order granting 20-day eitension for Springer tn file brief
In support of 000-415 petition Extension begins upon receipt
of NHC B007O3 response to 3prlngpr affidavit filed in CP
proceed Ing
BOWERS, E S Atomic Safety anil Licensing Board Panel BO/07/O9 If
0 Inspection reports, IE Bulletins t< correspondence
BOO7E4O139 Forwards IE Info Notice BO-2O, "Loss op Decay Heat fiomovol
Capability at Davis-Desae Unit 1 While in, Refueling Hodo "
No resjionae re-quired
O'DEILLV, J P Region 2, Atlanta, Office of the Director BO/05/OB
Spp
8007310439 Forwards IE Circular' 80-13, "Grid Strap Damage in
Uestlngbouse Fuel Assemblies " Mo written response required
a'REILLY, J P FlBBton 3, Atlanta, Office of the Director BO/05/2Q
IP
H007O101fla Foruardi IE Info Notice BO-23, "Ln*s of Suction to Emergency
Fffeduater Pumps " MB uritten response required
O'BEILLV.J P fieglan S. Atlanta, Office of the Director BO/OS/29
B007a300S4 Forwards IE Info Notice BO-26, "Evaluation of Contractor
OA Programs " No uhltten response reiguired
O'flEILLY.J P Region 3. Atlanta, Office of the Director BO/OA/1O
Zpp
B007O30201 Forwards nrganl lation charts for Ofq of NucUar Reactor
Regulation effective 000120 States means of appeal of staff
position
TEOCBCO.R L Assistant Director for Licensing BO/Oi/13 2np
BOO723O001 Foruiards statement nf policy re requirement* to be nit for
current OL appl icatlons, as derived from NL/REQ-0<M>0 (• found
in NUREO-0694
EJSENHUT, D O Division of Uicunaing SO/Oi/S6 3pP
Adjudicatory correspondenca
OOO73I0243 Foruards Commission 800327 memo rand urn & order containing
decisions on UC3 7B0502 petition for reconsideration of
7H0413 memorandum f< order UCB 771104 petition sought action
re fire protection for electrical cables
EISENHUTi D O Division of Licensing SO/Oi/BS B7pp
Q Inspection reports, 1C Bulletins ti correspondence
S007310I39 Forwards IE Info Notice 80-20, "Lots of Decay Heat Removil
Capabilitu at Davis-Hesse Unit 1 Uhit« in Refueling Motft "
No response required
O'HEILLY-J P Region 3, Atlanta, Office of the Director BO/OS/Ofl
Spp
0007210439 Foruards IE Circular BO-13, "Grid Strap Damage In
Uestinghouse Fuel Assomhlios " No written reipontB riqutrld,
O'REILLV.J P Region 2, Atlanta, Office of the Director. 30/09/28,
lp
90070J01BB Foruards IE Info Notice BO-33, "Loss of Suction to Emerooneil
Fnedwater Pumps " No written rnspnnno required
O'REILLV.J P Region 3, Atlanta, QFPicp of the Director, 80/05/29
8007330034 Forwards IE Info NotlcB BO-26. "Evaluation of Contractor
QA Programs " No written response required
O'REILLY, JP Region B, Atlanta, Office of the Director BO/06/10
2pp
0007160330 Forwards IE Info Notice 80-27, "Degradation of Riactor
Coolant Pump Studs " No specific action or response
r e O.U i r e d
Q'REILLV.J P Region 3, Atlanta, Office of the Director BO/06/11
IP
SOO716Q330 Forwards IE Info Notice BO-27. "Degradation pf Reactor
Coolant Pump Studs " No -specific action or response
required
O'REILLY. J P HeoioTi 2, Atlanta, Office of the Director flO/Oi/11,
B0072S036B Forwards IE Info Notice BO-SB- "Prompt Reporting Of Info In
Accordance W/10CFR3O 53(e> " No urltten response required.
O'REILLY.J P Region 3, Atlanta, Office of tha Director BQ/Oi/13
Spp
DOCKETED ITEMS
B007030445 Forwards IE Circular B0~k3, "Loss of Reactor Coolant Pump
Cooling * Natural Circulation CooldDiun " No written response
required
O'REILLY, J P (legion 2, Atlanta. Office of the Director BQ/0<b/2O
IP
QOO717QQ96 Forwards IE Circular 80-14, "Radioactive Contamination of
Plant Deminera 1 1 red Hater Sij 5 t. Resultant Internal
Contamination of Fersunnol " Mn LJiiEten re-sponse required
O'REILLV.JP Region 3, Atlanta. Office of the Director BO/OA/34
IP
BQ07170096 Forwards IE Circular BO-14, "Radioactive Contamination of
Plant Demineral lied Hater Bys d Resultant Internal
Contamination of Personnel " No written response required
O'REILLY, J P Region 3, Atlanta, Office of the Director QO/Ofi/24
90O723023B ForuardB IE Bulletin 80- li. "Potential Misapplication Dp
RotBMDunt Inc Models 1191 & USE Pressure Transmitters
U/Elther A or D Output Codes " Written response required
IE Circular 80-16 also end No written response required
O'REILLY.J P Region 2, Atlanta. Office of the Director BQ/O6/B7
BOO 723 O2 a B Forward s IE Bulletin OD-1&, "Potential Mi Eapp 1 icati an a f
rtoseraount !nc Models 11S1 ti 1 1S2 Pressure Transmitters
W/Elther A or D Output Codes " Written response required
IE Circular 80-lfa als.o end Ng untten response required
O'REILLY.J P Region 2, Atlanta. Office of the Director 3O/OA/37
IP
8007330533 Foruiarila response to IE Bulletin BO-OB, "E*an of Conta i runout
Liner Penetration Melds " Piping jieneti ations aro designed
& fabricated in accordance u/1977 edition of ASME Doiler t
Pressure Vessel Cod e, in-c 1 urlmg Bummer 1777 addenda
DAIL.L C Dule Power Co HO/O7/O7 ipp
8007250532 Forwards response to IE Bulletin BO-OB, "E<am of Containment
Liner Penetration Welds " Piping penetrations are designed
li fabricated in accordance w/1977 edition of A5ME Dollar &
Pr enure Vessel Code., includ ing Bummer 1777 addenda
DA1L.L C Dulie Power Co 80/O7/O7 6pp
DOCKET STN-SO-493 CHEROKEE NUCLEAR STATION, UNIT T
A Application/construction stage documents R c orr eapoeidence
DOCKET BTN-30-492 CHEROKEE NUCLEAR STATION, UNIT 2
A Application/canttruction stage documents h corresp ondence
SOO703Q2Q1 Forward* organisation charts for Ofc of Nuclear Reactor
Regulation effective BO04SB Status means of appeal of -staff
position
TEDEBCn, R L Assistant Director for Licensing BO/06/12 2pp
BOO7030201 Forwards urjani i ation charts for Ofc of Nuclear Reactor
Regulation effective 300-120 States moana of appeal of staf*
position
TEDESCD.R L Assi-stflnt Director for Licensing aO/Oi/13 2pp
B007230001 Foruarda statemo-nt of policij re runuircme-nta ta be met for
•current OL app 1 icot ions, as derivnd From NUREG-OA6O fc found
in NUREG-Ofe94
EI5EMI1UT.DQ Division of Licensing BO/Oi/S6 2pp
BOO7 230001 Forwards 8tatBin«nt of politv ro roquirements to be wet for
Kurrint OL applications, aa derived From NUREQ-OoiQ ^ found
in NUflEQ-Oi'M
EISENHUT, D 0' Division of Licensing BO/Oi/26 2pp
8, Adjudicataru, copi-espondence
Q Adjudicator^ correspondent
BOO731O243 Foriuards CommisslDli 90OB37 memorandum !< order containing
decisionB on UCS 760302 pet It inn far recons idsrat i an a F
7Q0413 momarandum & order UCS 771101 petition sought action
TD fire protection for electrics! cobles
EIEENHUT, DO Division of Licensing BO/Ot/23 Q9pp
80073102^3 Forutards Commission BO05S7 memorandum d order containing
decisions on UCS 7B0502 petition for reconsideration of
7B0413 memorandum t> order UCB 77HOfl petition sought action
ri fire protection for electrical cables
EIBENHUT, D. 0 Division of Licensing 00/06/85 S9pp
Q Inspection reports, IE Bulletins & correspondence
Q Inspection reports. IE Bulletins & correspondence
BO0724O139 Formarda IE Infn Notice BO-2O, "Loss of Decay Heat Removal
Capability at Davls-Desse Unit 1 Wh i 1 c in Refueling Mode "
Ho response required
O'REILLY, J P Hegion 2. Atlanta. Office of ths Director BQ/OS/DB
BOO7240131? Forwards IE Info Notice 80-20, "Loss of Decoy Heat Removal
Capability at Davii-Besse Unit 1 While in Rerueling Hade "
No riiponse required
D'REILLY<J P Region 3, Atlanta, Office of the Director BO/Q5/OB
2pp.
B007S10439 Forwards IE Circular BO-13, "Orid Strap Damage iti
Untlnghouse Fuel Assambllei " No uritton response required
O'REILLY, J P RBflion 2, Atlanta. Office of the DJl-BCtor 8O/05/EB
ip.
B0070101BB Forwards IE Info Notice SO-23, "Loso of Suction to Emurgencij
Ft ed water Pumps " No written response required
O'REILLY. J.P Region Si Atlanta. Office of the Director, BO/03/29
lp
8007320054 Forwards IE Info Notice BO-26, "Evaluation of Contractor
QA Programs " No uirltton response required
O'REILLY.J P. Region 2, Atlanta, Office of the Director 8O/06/10
8007160230 Forwards IE Info Notice BO-37, "Degradation of Reactor
Coolant Pump* Studs " No specific action or response
raqulred
O'REILLY, JP Region 2. Atlanta. Office of the Director BD/O6/11
BOO7210439 Forwards IE Circular BO-13, "Grid Strap Damage in
Mast inghoiise Funl As-semblies " N-o written response requtrod
O'REILLY. J P Region 8. Atlanta, Office of the Director 80/05/28
lp
8007010168 Forwards IE Info Notice 80-23. "Loss of Suction to Emergency
Foeduater Pumpi " No uiritten response required
O'REILLY.J P Floglon B, Atla,ntfl, Office of the Director BO/03/29
lp
B00722OOS4 Forujards IE Info Notice BO-EA. "Evaluation of Contractor
•OA Progroms " Nn urittBn response renuired
a'REILLY.JP Region 2, Atlanta, Office of the Director BO/Ob/10
3pp
BO0716O230 Forwards IE Info Notice 80-27. "Degradation of Reactor
Coolant Pumps Btuds " ttn specific nctian or response
required
O'RElLLYjJ P Region S. Atlanta. Office of the Director HO/06/11
Ip
BOQ735Q36B Forwards IE Imfn Notice 80-2B. "Prompt Reporting oP Info ill
Accordance W/10CFfl9O 33(e) " No written response- required,
O'REILLY, J P neyion 2, Atlanta, Dfficf of the Director BO/06/13
B0072S036B Forwards IE Info Notice flO~SB, "Prompt Reporting of Info in
Accordance W/10CFR50 55<e} " No written response required
O'REILLY.J P (legion S, Atlanta. Office -of the Director BO/06/13
BQ0703Q'H5 Forwards IE Circular SO-13, "Loss of Reactor Coolant Pump
Cooling li Natural Circulation Cooldoun " Ho written response
required
O'REILLY, J P Region a, Atlanta. Offire of the Diractor BO/Ofa/SO
B007020445 Forwards IE Circular -BO-IS. "Loss of Reactor Coolant Pump
CoDlino d Natural Circulation Cooldoun " No written response
required
O'REILLY.J P Region B, Atlanta. Office of the Dirnctor BO/OA/20
SO07170096 Foruards IE Circular BO-14. "fiadlooctiva Cntitaml nation of
Plant Demineralimd Wntar 3«s S. RuEiiltont Internal
Contatrination of Personnel " No uiri tten r&oponse requirc-d
O'REILLY. JP Region 3, Atlanta, Clffiro oF the Director BO/Ofi/34
lp
306
DOCKETED ITEMS
Bao?aa022B Foruards IE Bulletin PO-li, "Potential Misapplication of
Rnsemnunt Inc Models 1151 !. 1 1 32 Pressure Transmitters
W/Elttier A or D Output Coripo ' tint ten response required
IE Circular 00-16 also sncl No luntten response required
a'REILLV.J P Region 2. Atlanta. Office of tlie Director BO/O6/S
IP
QOO7300413 Discusses B0061B deposition t, request For documents Requiltt
reasons For document request within 14 days ti change in date
of deposition to last cult in Jul In San Antonio, TX Related
correspondence
SINKIN.L CituenB Concerned About Nuclear Power, Inc 00/07/03
BQ07230332 Forward! response to IE Bulletin 00-09, "Eiam of Containment
Liner Penetration Welds " Piping penetrations arc designed
ti fabricated in accordance u/l<?77 edition of A3ME Boiler t
Pressure Vessel Code, me 1 odi ng Summer 1977 addends
DAIL.L C fluke Power Co SO/O7/07 fipp
QQ073Q0406 Requests conf irmatmn that meeting notes, memberl nanei,
documents t> records, position papers, taped conversational
consent of intervi euieea. by-lauiE & notes will be provided ft
agreed In deposition Related correspondence
COHAN. F Baker t, Gotta 8Q/O7/07 4pp
DOCKET 30-496 MONTAGUE NUCLEAR POWER STATION. UNIT 1
A Appl ication/cuns trur tton stage documents & correspondence
0OQ72300O1 Foruatfls statement of policy re requirements to he met for
current DL ap pi i c atlons, as derived From NUFIEa-DAiO & found
In NUREO-O691
EISENHlir,D G Division of Licensing aO/Ot.f3i, 2pp
DOCKET 50-497 M-QNTAGUE NUCLEAR POWER STATION. UNIT 3
A Application/construction stage documents & correspondence
H00716O5S3 Identifies documents to be produced within 30 days per P
Duchorn deposition testimony re application for OL Related
correspondence
HUDSON, T D Baler !. Botts 80/07/00 4pp
B007310145 Motion for discovery schedule eitenalan until 801201 NRC
000430 order to shout cause wording parallels Contention 1 7
uinich mag be resolved by util corrective action* In aniuer
to order W/Certif i cate of Svc Delated correspondence
8INKIN.L A CltilEns Concerned About Nuclear Power. Inc
BINKIN,L A Citliens for Equitable Utilities BO/Q7/OB 4pp,
B0071B0246 Forwards notice of appe-arance In proceeding
BLACK, R L Hearing Branch I BO/07/lfi 2pp
BQQ733OQO1 Forwards statement of policy re requirements to be met for
current OL app 1 icat i ona, as derived from NUREO-OAiO tt found
In NUfiEQ-0694
EISENHUT, D O DwJaion of Licensing BO/Q&/36 3pp
9007230013 Submits rcpt re status of enforcement action Early heirinj
schedule discussions ra OA/QC Issues should abide
enforcement action resolution Day City TX BOOB19 public
hearing mill be held per ASLfl B00430 order
BLACK, R L Hearing Branch t 80/07/18 Hpp
DOCKET STH-50-49B SOUTH TEWS PROJECT, UNIT 1
A Application/construction stage documents & correspondence
S007030&73 flesponiis to 800514 request for rcvisian of it emu contained
In NRG 000417 immediate action 1 tr Inaccuracies in
preliminary info initially provided to Region 4 uere
Included in immediate action Itr
SEYFRIT, K V Region 4. Dallas' Office of the Director QO/Oi/10
?pp
— B007O2067B Requests revision of items contained In NRG B00417 immediate
action Itr to ensure that correct info is transmitted &
misinterpretations are minimized Inaccurate info provided
to NRC included in immediate action Itr
TURNER. E A Houston Lighting fc Pouier Co 00705/14 2np
00O702O327 Forwards NRC Ofc of Nuclear fieactor Regulation 600438
r*organi lation chart Necessary period oF transition made
ui/min diaruption to ongoing activities
7EDE3CO.R L Assistant Director for Licensing 30/06/13 3pp
BOO73300O1 Fomiards statement of policy re requ ircmentl to be met for
currant CL applications. as derived From NURE-0-OtAO b found
in NUREO- 0694
EISENHUT.B G Division Of LUensinff BO/OA/at 3[ip
BO0730037S -Requests specific direction Ei instructipns for qualification
of stress analysis computer cade Code IE planned to be
released from AD Little. Inc & will bo used In calculations
for piping sus (ASHE III (,/or ANSI B31 1)
BARKER. D G Houston Lighting & Power Co BO/07/B3 lp
B00724Q48S Advises of status of enforcement action per NRC commitment
Houston Lighting ti Power responded to IE OOO+30 notice of
violation ti civil penalty by paying amount Imposed Affirms
position re discussions of GA/GC early hearing schedule
BLACK, R L Hearing Branch I HO/07/10 2pp
8007300417 Discovery rept for June-Jul 19BQ Received 800616 Rentfro &
Marrack interrogatories tt replied on 000709 Received 600704
Marrack motion to quash subpoena for deposit! on, Depot itlol)
taken by agreement on QOO7I6 Related correspondence
CDPELAND, J 0 Baler ti BnttB BO/07/ IB lp
SD07G00090 Response stating no opposition to Citiiens Concerned About
Nuclear Pouer Si Citiicns for Equitable Utils motion for
discovery intension until D01201 Certificate -oF Svc encl
HUDSON,! B Houston Lighting !< Power Co HUDSON,! B Dftier fc
Botts » LouenatBin.Neiuman.Reis, Aiclrad (.Toll 80/07/23 Spp
SO 0729 0740 Response stating no objection to issuance of order extending
discovery period until 8O1201 upon request of Citilens
Concerned About Nuclear Power No hearings v* IE enforcement
action are imminent Certificate of Svc encl
DLACK, R 1- Hearing Branch 1 BO/07/20 Spp
|t Oe-neral correspondence
9007300318 Requests change of addressee on NRC correspondence fron
EA Turner to GW Dprea.Jr Addresa IB unchanged
OPREA,0 H Houston Lighting fc Power Co 00/07/23 lp
M Antitrust correspondence
C Adjudicator^ correspondencp
B0070ao&Q9 confirms understanding B re ui tndrauial s of Droiun fc Root
brochure on imp lementa tion of QA prngram at job site
ft assDclat«d videotape Copies will lie available as evidence
In order to show ciius* I< (lending DL application
COWAN, F E &a*or & Dotts 80/06/10 3pp,
B00711O001 An-Ewers to NRC interrogfl ton e s * request For documents
Identifies DE SUIBIJTB as witness intended to be called re
(lo-nconforrmance rejits of Contention 1 DG Britfenbauflh & R
Hifbbard will bp called re Contention 3 W/Certif icate of Sve
BINHIH.L A Committee for Application of Nuremberg Principles tn US
Nuclear Pouor Production BO/Oi/13 7|ip
B00731OB43 Forwards CDmnission BOO337 memorandum 6 order containina
decltiane. on IfCS 7903O2 petition for reconsideration of
7B0413 memorandum tt order UCS 77J104 petition, sought action
m fir* protection for electrical cabins
EISENHUT.D O Division of Licenainj 8O/06/29 B9pp
8007010317 Foruiards work order eitending Hai-tleu. contract to 800331 M/0
enc 1
BLUMS, M B Antitrust Division BO/04/14 lp
8007010364 For wards signed stipulation abiding by ABLE 800331
protective order rn Houston Lighting b Power corporate
•tudy W/D encl
BLUME.H Q Antitrust Division 90/04/14 lp
BOO 701 02 ?8 Foruiards documents mistakenly omitted Prom Hartlev
documents W/n encl
HODODON.A P Antitrust Division 80/03/07 lp
BOO70S0577 Ac k receipt of BOO330 Itr to TX Parks t< Wildlife Dipt
advising that TX Utils Generating Co is not prepared to
enter into lease agreement u/Dept covering Bquaui Creek
Resorvior, Requests info re util Intentions
PREISTER.D J Texas, State of 00/06/10 2pp.
DOCKETED ITEMS
307
BOO7Z1O38CJ Reviews BO07O2 draft transmi ssi nn svc settlement agreement
Document found to be unacceptable due to provision! making
Austin jurisdiEtional as practical matter fop wheeling
"Postage stamp" wheeling rate is not proper in TX
BALQUGH, It C Austin. TX BO/07/10 2pp
BOO? 130425 Status rept advising that absent change in DOJ policy
position, util uill not bo able to reach settlement u/dept
Differences ui/NRC re license renditions not yet resolved
Certificate of Svc end
CfiEEM, D 0 Houston Lighting & Power CD t Baker t> Butts *
LouBnstein, Newman. R* is. Aiolrad t, Toll SO/O7/1) 7p p
6OO7 130431 Status rept on settlement negotiations Urges to-day
suspension of prnc eed »nga. inc lud ing hearing date. flue to
continued negotiations IB/Public Utils Hoard of City of
Brownsville, TX W/Cerli Flcate of Svc & pleading before FERC
STAHL.D M Central fc South West Carp STAHL, D M Isham, Lincoln fc
Seal* BO/O7/11 Hipp
BOO7130149 Status rept by Public Utils Board of City of Brounavi 1 IB. TX
re settlement progress City would not abject to further
•itansian limited to 30 days although negotiations do not
appear to he Fruitful Certificate of Bvc end
PDIRIER.M It Drouinsville, TX POIRIEH.M fi Spiegel * McDiarmid
BO/07/11 6pp
— B007280636 Joint matinn for c 1 ar ] f i t ation of A5LB SOG716 memorandum
containing decision to reconsider ASLD BOO307 order re
settlement documents Movec. for- order es tab ] i all ing schedule
for production of settlement {focumpnts W/Cert i Ficate of Svc
FABHlKfWr.Ft Justi c e. DepL of CHANrtHIA, F D , BLUME, M B
Antitrust Division BO/O7/31 Bpp
H00730O35i. Order granting intension until BOO73i For NRC to submit
objections J. pruposeit revisions to BQO7J7 final prehå
cortFerance -order
UDLFE.S J Atomic Safety and Licensing Board Panel BO/O7/23 lp
- 1 pti
B0071S0008 Transcript of HOO7H jirehearino conference in Dethesda,
MD re settlement negotiations Pp B9I-91A
« Atomic Safety and •Licensing Hoard Panel BO/O7/I4 7Bpp
HOO72SO141 Proposed correction to BOQ4O9 prehearino transcript
Certificate of Svc encl
GHEEN.D Q Houston Lighting (. Power Co » Haker !. Dotts "
Louiensteln.Neujman. Relo. Aiolrad & Toll BQ/07/SS 3p p *
Inspection reports. IE Dulletins (e tore espondenc
BOO 7 ISO 500 Third Bbatue rept on settlement progress Suggests 30-day mln
utension to pursue negotiations t, to present proposed
license conditions re transmission SVCE & other areas
Certificate nf Svc end
CHANANIA, F n Antitrust Division 8O/O7/1I Spp
B00725O31'? Foruiards IE Info Notice 8O-12, •' I nstrumenb Failure Cauaei
Opening of PQRV !, BlDrk Valve " No specific action or
response necetsaiij
8EVFR1T.K V Region 4. Dallas.. OFfitc ai tho Director 90/03/31
lp
BOO 7 16062 3 Status rept r* settlement negotiation progress Etpreises no
optimism For agreement u/DDJ but agreement u/NRC may be
reached re licence conditions dealing in/fault pouier wheeling
rate« Certificate of Svc encl
SAMPLE3.M D KNOTTS.J D Texas Utilities Generating Co
SAMPLES, M D Worsham, Forsythe t. Sampcla BO/07/11 fcpp
BOO 7 170364 Status rept r* development of BBttlement diicusBioni Urgin
dani*l of addl extension oF time due to belief that no
uttltmint uill be reached between DOJ & applicants
Certificate of Svc encl
CYPHERTiH D Justice, Dept of QO/07/I1 hpf
80071703BB Second » to tun rapt re settlement negotiations progress Urgei
further antitrust settlement efforts to proceed apace u/FERC
settlement due to similarity of Issues Certificate of Svc
end
JOHN.D F Affiliation Unknown JOHN, D F Med ina electric
Cooperative, Inc JOHN, D F MrDormott, Hi 1 1 {< Emeru 80/07/11 ipp
B007210493 Submits status rept of settlement negotiations In Houston
Lighting b Pouitr Co et al b TX Utilities Generating Co
Mod of joint ownership an.reemBnt drafts eichanged
Certificate of Bvc encl
BURCHETTE, W H . H1TT9, F H Northcutt Ely BO/07/11 4pp
BOQ7 160317 Mutton leeklng reneual of DOJ 800S31 motion to establish
trial ti other procedural dates Suggests B0090B for briefs
b S01O06 for comment em unt of evidentiary hearing Bettlemont
d-oes not appear to be possible Certificate of Bvc end
CYPHER!, 5 D , PARMENTER, F Just! ce, Dept of BO/07/14 6pp
B007220300 Bugpests reconsideration of 800307 discovery order in light
of extensive settlement negotiations subsequently conducted
bu all parties d counsel on B004Q3
MILLER, M,E Atomic Safety and Licensing Beard Panel QO/07/16 lp
B0072a0536 Order denying petitions for directed certification ui/o
prejudice to reoubmisoion Fallowing ABLO determination
BISHOP, C J Atomic Safety and Licensing Appeal Panel SO/O7/1B
BO07150Q64 Ack receipt nF B00109 I. O30B Itrs informing «nc nf steps
taken to correct violations noted in IE Insp Repts
90-49B/79-2O *, 50-49-7/79-30
SEIDLEiH C Rogion It Dallaii Reactor Construction !t Engineering
Support Branch 80/04/04 lp
— S007150075 Responds to NRC 791213 fe 80OS20 1 trs re violations noted in
IE Insp Hepts 50-49B/79-20 !. 50-499/79-SO Corrective
actions const procedure CCP-4 revised or 800317 tn
incorporate baffle board use
TURNER, E A Houston Lighting A Power Co BO/-Q3/1B 2pp
B007010O72 Updates B00331 response to IE Bulletin 79-3B. "Possible
Malfunction of NAKCQ Model CA1SO Limit Switches al Elevatod
Temps " Ho addl info has been received from vendors
TURNER. E A Houston Lighting !. Pouer Co aO/O-J/30 3pp
B00723071B Ac k receipt of GOO-43O 1 tr from NRC Responses to notice of
violation, not ice of proposed imposition of civil penalties
t, Section 6 of order to shou cause will be submitted uithin
periods specified in NRC notice & orders
QPREA, Q H Houston Lighting £< Pouier CD 60/05/14 lp
H00724O5O3 Foriuords IE Info Notice BO-21 , "Anchorage !< Support of
Safety-Related Elpctntal Equipment " No uirltten response
required
8EYFRIT.KV Region fl. DaHas, Office oF the Director QO/03/16
lp
BO07010203 Foruiflma IE Insp Repts BO-498/BO-06 !. 50-199/0.0-04 durini]
Apr 19BO No noncornp 1 iance noted
BE I DEL- W C rtgioji 4> Dallas, Reactor Construction !> Englneer>ing
Support Branch BO/09/19 'Jpp
— B0070102I3 IE Insp Repti SO-49H/UO-OA t. 30-499/BO-06 during Apr I960
No noncomp 1 lance noted Major areas inspected previous Items
of noncompl iance, site tour, safetij-rD 1 a tod pipingi containment
structural steel !< follouup on conut deficiency
PHILLIPS, H B , CROBHHAN, U A Region 4. Dallns, QfflrB of the
Director BO/OB/ 13 6nji
80073001 IB Withdrawal oP 7?0511 notice oF appearance R Fahrikant
r«ipon»ible for all communications until further notice
Certificate of Svc encl
CYPHER!, S D Justice, Dept of SO/07/H3 4pp
90072 BO 6SO Draus attention to tuio pleadings that should be treated
inparately although stapled togethevNRC motion ror
extension of time h NflC/OOJ joint motion for clarification ti
for establishment of production schedule
CHANANIA- F D Antitrust Division SO/07/25 lp
B007tDt>3ia Foriuarils IE Insp RtptB 3O-49S/BO-1 1 t. BO-497/BO-1 1 on
B005O5-OB No nnncniThp 1 iance noted
BEIDLErW C fip-gion 4> Dall^si Reactor Construction !< Engineering
Support Branch 130/05/3-3 E[tp
— B007100346 IE Insp Repts 50-498/60-11 I. 50-499/BO-i 1 on QOOB05-OB No
noncompl ianc e noted Major areas inspected const activities,
stop uiort DTilpr far RCPQ uelijing & re-act or containment
liner dome uelding
CROBSHANi W A R -03 ton 4, Dallas, Reactor CcinstTuction & Engineering
Support Branch GILBERT.!. I> . MARTI M. L E Region 4, Dallas,
Office of tlie Director SQ/O3/22 ipp
BO072BO6H7 Motion for extension until B00731 to file objections ia/
proposed revision to ABLO B00717 prehoaring confornnce
order & notice of final prehearing conference Discussions w/
parties haw ironnnencecl d must proceed
LEWIB.S H Hearing Ui-flnch 2 BO/07/23 2pp
B00702O253 Foruardi. IE Info Notice 80-22, "Breakdowns In Contamination
Control Programs " No written response required
8EVFRIT, H, V flegiim 4. Dal Ui. DFfite oP the Director BO/O5/SQ
308
DOCKETED ITEMS
BO07OI0037 Forwards IE Info Notice 00-33, "Loss of Suction to Emergency
Foedujater Pumps " No njrittp-n response required
SEVFHIT.K V flegion 4, Dallas, flffica of the Director BO/O5/29
Q007150007 Forwards IE Investigation Jiepts 30-49B/BO-15 6 30-479/00-18
on 8QD603-Q& No noncuinpl lancB noted
BEYrRIT.K V flogion 4. Dallas, Office of the Director BQ/0&/3O.
BOO721O333 Forwards. IE Insp He-pis 50- 49B/SO-12 t. 5O-4"3<?/BO-ia on
600512-15 Mo nnntomp 1 lance noted
SEIBLE.H C R-pgion 4, Dallas. Reactor Co-natrut tt an !t Engine-aping
Support Branch BO/CK./Q3 Spp
— 8007340337 IE Insp Reptffi 50—190/30-12 !, 5O-49WGO-12 on B005IH-15 No
noncomp 1 lance noted Major arras inspected observation of
uorfc ti review of records re e-arthuiorl t- concrete
TrtPIft,J I , CnaS5NrtN,U A Regian 4. Dallas. Office of tho
Director HALL.H E Region 4, Dallas, Reactor Construction &
Engineering Support Branch BO/O6/O3 6pp
BO071OO433 Updates respnn.no to IE Bulletin 79-SH re use of NAMCG Modtul
Eft 1BO stem-raounteit limit switches Mo corrective action
roquired for majority of vendor* Cue vendor still conducting
reviflu (V other implemented corrective action recommended
TURNER, E rt Houston Lighting T. Pouer Co 80VQ4>/u4 2pp
BOO7220C9B Forwards IE Info Notice 60-34), "Evaluation of Contractor
OA Programs " No written response required
fiSIVFRlT.K V Region 4, Dalian, Office of the Director BO/06/1O
lp
0007020103 Acl receipt nf BOO!iB3 Itr informing NIC of steps taken to
correct violations noted in BGO430 notice of violation ('
order to show cause Implementation of oilsting flfl/QC
procedures uii 1 1 be focu-5 of follouup map
STELLDjV Office of Inspection & Enforcement, Office of the
Director SO/Ofc/11 9p p
— 800713000*7 1C Investigation. Repta SO-493/BO-15 t. 30-499/80-18 on
000il05-0ij No none omp 1 1 anc e noted Major areas inspected
allegations that consultant Firm had recommended const be
discontinued at site for nne ur
HERR.R It , DRISKILL. D D. , SEYFRIT.K V Region 4> Dallai, Offica of
the Director SQ/Q6/3O 6pp
B00709024i RevlloB IE Dullotin BO-OS review subraittal date from 800707
to 0804
OPflCA. O 14 Houston LlQhtlng & Power Co BO/O7/03 2pp
BQ0722057B Responds to IE Hulletln, 79-28 re uie of NAMCO Model £A 100
stom-irountod limit sui tthes, Revioul of all vendor* indicate*
onlg one affected Recommended corrective action implement ad
DPREA.O W Houston Lighting d Pawir CD SO/07/14 2pp
9 Reportahle occutrenc as, LEU* ti related earreipondence
80O71OD443 Svcond Interim deflfiincg rept re damage to Unit 2 reactor
containment bltfg iteel liner plate Plat* removal It napping
comploted Neit interim rapt to be- submitted by B00711
TURNER, E A Houston Lighting EC Power Co BO/06/0& 4pp
80-071*0319 aecond interim Part 21 rept re steel liner plate in reactor
containment bldg. Progrese on repair includes completed
removal of deformed linsr plate If detailed napping of
removed plate submitted to contractor
TURNErt.E A Houston Lijtiting i. Fouior Co BO/06/06 ipp
G007170203 Responds to 1C Bulletin BO-O9 "Hydramo tor Actuator
Deficicncleg " No sa Fety-r elated eg E or component in South
TX Project uses subj actuators
QPDEfl.O H Houston Lishting & PoyBr Co aQ/Oi/13 lp
HO07290O59 foroiOTds IE Info Notice BO-P9, "Prompt RoportinB of Info in
Actorflante W/JOCFR90 35<e) " No written responso require!)
SEYFF1IT.K V fieoion 4, Dallas, Office of the Director BO/Oii/13
8007330378 Fnrujdrd) IE Insp Repts 9O-1'?a/aO~l 0 t, 30--399/BO-1O during
Hay 1?BQ No none ompl i ancs noted
3EIDUE.U C Region •), Dnllas. Ro-actor Construction & Engineering
Support Branch BO/OA/19 2pp
--S007&3039S IE Inap Repta SO-49B/E3O-IO ti 5O-^99/BO-l 0 durins May 199O Ho
noncomp] iance noted Major areas inspected abructura]
backfill^ strut t oral concrete, containment tendons, component
storage fe follouup on const deficiencies
GROSSMAN, W A . PHILLIPS, H S Region 4, Dallas, Office of the
Director 80/OA/17 (bpp
BO-0-7340039 Forwards IE Circular HO- 15, "Lose of Reactor Coolant Pump
Caolinj Si Natural Circulation Cocldoun " No written reaponte
Tequi red
SEVFFJ1T.K V Region 4, [lallji, Office of the Director BO/Ob/20
IP
3007260133 Forwards IE Invffatigatlon Hopta 50-J9B/BO-09 t. 30-499/80-09
on B004I9-1B No noncomp 1 iance noted
EEYFRIT, K V Reg-ion 4. Dalian, Office nf the Director BO/Ob/23
BOO707030& Second Interim deficiency rept re polar crane rail tie-doun
studs Investigation bij vendor concludes that acciptabllitv
flf polar crane hold-down studs are questionable Broun & (loot
will further evaluate sgs Nei~t report to be sent BOO BO 1
TURNER, E A Houston Lighting b Pouier Co BO/06/23 9pp
B0070H061B HO an BO0529, Jurinj design revleu, seismic o,ualif ication of
eisential cooling water intake ittructure gantry crane &
dleiel generator fuel storage tflni found ui/dificient
naponse spffctra value* Neu seismic evaluation in progreti,
DPREA.O M Houston Lighting & Power Co BO/06/26 4pp
B007O90365 Interim defici«ncij rept re breakdown in quality program for
concrote placemflnt CI1-U9O Broun St Root continuing
invffstinjatlon of conditions t< examining documentation b
physical quality of placemen-t
CH>nEA,0 U Houston Lighting fc Pouer Co BO/O7/03 2pp
B007110337 AdviEBG that 80O603 potantially reportable deflclencg re
concrete placement in dlesel generator bldg Is not
repartablo under 1OCFR3O 95(e>
OPREA, 0 a Houston Lighting b Pouer CD BO/07/03 3pp
SO071SOi)4S Final deficiency rept re reactor vessel outlet noiile tafa-
ends Evaluation thouis that condition would not adversely
affect safety of plant operation Hatter considered not
reportabl* under lOCFfiSO. 39Ce>
DPREAiO U Houston Lighting & Power Co BO/07/03 Bpp
B00716O&04 Forwards Interim doFicinncg rept re linear plate bulge
repair Next rapt mill be lubmittHd B01001
U Houston Lighting « Power Co BO/07/11 3pp
— 8O075BO137 IE Investigation Rents 5O-19B/BO-0? «< 30-499/60-09 an
B00419-1B Mo noncompl iflnco nateil Major area Investigated
allegation that Brown fc Runt. Inc attemjitcd to Intimidate QC
inspectors It employees into covering up const defects
BEVFniT.K V . DR1BKIUL.B D , HflCJjP E Flegloti 4. Dallas. Office of
the Director BO/O6/J9 !0pp
-14. "Radioactive Contamination oF
panic required
llcation of
ed
rod
— 8007160609 Interim doficlency rept re linear plate bulge eonsintlno at
logic For linear plate bulge repair
* Houston Lighting « Pouter Co BO/O7/11 lp
0007210311 Third interim deficiency rept re damage to steel liner In
reactor containment bldg Logic for liner bulge repair encl
Neit rept utll he foruardetf hy B01001
OPREA.O W Houshon Llflhtino ft Power Co BO/07/11 4pp
QO07Z7O4'tl Part SI rept re latent matl noneompllances In AS HE Section
III pipe supports supplied by NFS Industries Initial revleu
indicates no defiqiencij since supports are used in
nonueld Ing applications
RICE. H M Brown f, Root Corp (subs of Halliburton Corp )
BO/07/11 3pp
6007230912 First Interim deficiency rept re breakdown in Brouin (< Hoot
QA program TO procurement cycle of purchased matle at
facility Procedures for procurement cycle control & all
vanJor-rplated activities & records under review
OPREA.8 W Houston Lighting I. Power Co BO/07/H 9pp
DOCKETED ITEMS
309
&007330S29 Interim deficiency rept re diesel generator Fuel oil tank
roan exhaust fans Per commitment 5 in PSAR ti FSARi fans, must
be connected to Class IE pouier Fans not supplied From Class
IE source Corrective actions being evaluated
OPREA.Q U Houston Lighting & POIUBT Co BO/07/14 3pp
D00730O115 D11LU55C& BOOfalB rt0poB [ ti on & request for documents Requests
ruasons For document request uithiTi 14 daijs t, change in dote
of deposition to lost, uih in Jul in San Antnnlo. TX Related
correspondence
5INK1N.L CltnenG Cunceineil About Nuclear P onion Inc 30/07/02
GOQ733O476 Interim deficiency rept re min/mai soil density test on
essential cooling mater backfill Detailed info re deficiency
will be provided to NRC as part of response to Item 3PApp A.
of 000130 order to nhou cause
OPREA. 6 M Houston Lighting & Power Co BO/O7/17 3pp
8007230340 Interim deficiency rept re matl control of ASTM A-333
structural KtBel bolts Improper segregation of Category I tt
nan-Category I structural steel bolts In field resulted in
bolts procured under non-Category I specs
OPflEA. 0 W Houston Lighting b Pouor Co BO/07/17 4pp
S0073001Oib Requests r on f irma t-i on tliat meeting notP3i members name 5 1
documents t< records. post 1 1 an papers , tap ed conversations.
consent of Interviews 5, bij-] am 5 ft notes uill be provided as
agreed in deposition Related correspondence
CDWAN.F BakHT J. Hntts SO/O7/O7 4p p
6Q07160S53 Identifies documents to be produced within 30 days per P
Due horn deposition to iti no rig re application fur OL Delated
correspondence
HUDSON, T n Daker 3, Botts BO/O7/OB 4pp
BOQ73QQ3Q2 Interim deficiency rept re re-evaluation of piping ualdi
previously found acceptable Liquid penotrant retost by
Southwest Research determined that eight welds exhibited
lineal Indications In excess of code limitations
OPREA. Q H Houston Lighting d Pouier Co BO/07/54 3pp
U Connreisional/eiecuti VB Correspondence
BOO73003i3 Requests testimony presented at 000639 committee hearing rt
issues relating to const of nuclear power plants
ECKHARDTi B House nf Hep . Intcrst t. Foreign Commerce QD/07/11
Zpp
DOCKET BTN-30-499 SOUTH TEXAB PROJECT. UNIT 2
A. Application/construction stage documents & correspondence
BO07Q20i7S Responds to SOOS14 request for revision of items contained
in NRC B 00-11 7 Immediate action )tr Inaccuracies In
prBlittlnarg Info initially provided to Region 1 were
Included in immediate action 1 tr
8CYFHIT. K~v Region 4> Dallas. Office of ttie Director QO/06/1O
Bpp,
— 800702067 B Requests revision of items contained in NRC B00417 immediate
action Itr to insure that correct info is transmitted &
misinterpretations are minimized Inaccurate info provided
to NRC Included in Immndiate action Itr
TURNER, E A Houston Lighting fc Pouer Co BO/09/14 2pp.
B007 020227 Foruiflrds NRC Dfc oP Nuclear Reactor Regulation Q004S8
reorgani iabl on chart Necessarg period of transition made
M/min disruption to ongoing activities
TEDE8CD, fl L Assistant Director for Licensing BQ/O6/13 Spp
EHW7230001 Fnruards statement of policy re requirements to he net for
current OL applUati.ont.flS derivsd from NUREO-Q660 d found
in NUREG-O694
EIBENHUT, D 0 Division of Llconslno BO/ 06/36 Spp
EJ007Q00375 Requesti specific direction It Instructions for qualification
of strec* analysis computer cadi Cade is planned to be
released from AD Little- Inc tt will be used in calculations
far piping sys (ABHE III i/or ANSI D31 1)
BARKER. D 0 Houston Lighting t, Pnuicr Co &0/O7/33 ip
O Adjudieatory correapondonce
6O070aOibOS Confirms understandings re withdrawals of Broun & Root
brochure on impl emontation of QA program at job situ
It aiauciated videotape. Copies uilll be available as evidenc"
in order to show cause & pending OL application
COWAN, F E Dakar b BotU HO/OA/1O 3pp
GO07110001 Ansuers to NRC intErrooatori 01 * request for document*
Identifies DE SUJBIJIB as uitnass intended to bo called: re
nonconf ormance rept* of Contention 1 DO Bridenbaugh tt R
Hubbard uill be calleri re Contention 3 W/Certif icate of Svc.
fllNKINiL A Committee for Application of Nuremberg Principles to US
Nu clour PoUBr Production BO/06/ 13 7pp
B007310145 Motion for discovery schedule ei tension until Q01SD1 NRC
BO0430 order tp ehoui cause wording parallels Contention 1 7
which may be rusclveil bij utll (.orrectlve actions in answer
to ardor (I/Certificate of Svc delated c orrespandonc e
QIHKIN.L A Citnons Concerned Abcut Nuclear Pauar> In-c
BINKIN.L f\ Citin-ns For Equltiible Utilities 30/07/06 4pp
B0071902-)A Foruards notice of appearance irt prncepding
DLACK.R L Hearing Branch 1 BO/O7/1A 2pp
G0072S0013 Submits rept r-i> at, it us of enforcement action Early hearing
schedule discussions r-o OA/QC Issues aliould abide
enforcement action resolution Ds\j City TX BOD 9 11? public
hearing uill be held per AILL nOO-iaO order
DUACK.R L Hearina Branch 1 BO/O7/19 2pp
6007240435 Advist>a of status o-f enf or r cmrnt action per NRC cammitment
Houston LigliUni) !. Pouiar respondod to IE BOO430 notice of
violation S< civil penalty bij jiayin^ amount imposed Affirms
position re discussions of OA/Q.C early hearing schedule
BLACK.R U MDarins Brancli 1 BO/O7/1B Sff
O007300417 Disc-ovary rept far June-Jo 1 1980 Received 300616 RentFro 1
llarrack interrogatories fc replied on SOO709 Received 600-706
htarrack motion to quash -subpoena for deposition Deposition
taken by agreement on HQQ7 1 1, Rolat-od corresporkdence
COPELrtND. J 0 Dakar & Dotts BO/OV/1S lp
Q 007 30 DO1? 0 ReBporiKe stilting no opposition to Cittiens Concerned About
Nuclear Power ti titiic-ns far Equitable Utils mobion for
discavery intention until 90 J HOI Certificate of Svc one 1
HUDSON, T D Houston Lighting ft Puuer Co HUDSON, T D Da I: or (,
Bntts » Louisn&tein. Meiuman. R&is. Aielrad ^ Toll 00/O7/23 Spp
8007270743 flesponte atottn-g no objection to issuance of -ardor Bit end ing
discovery pcrind until E301S01 upon request of Citliens
CDncernefl About Nurlear Power Mo hearinga ro IE enforcement
action are Imminent Certificate of Svc end
BLACK, n L Hearing Branch I 00/07/20 3op
H General correspondence
0007300343 Request & change oP oddressoH on NRC correspondence from
EA Turner to ON Qpreo. Jr Address is unchanged
OPREA.Q W Houston Lighting * Power Co 80/07/33 lp
H Antitrust correspondence
8007010347 ForuanPa mork ord-or i>xtnnding Hartteij contract to 600931 H/o
encl
BLUME.H C Antitrust Division 80/04/lfl lp
0007010364 Forwards signed stipulation abiding by A3LQ 900031
protoctivo ordur ro Huustan Lighting ft Pouinr corporate
• tudij U/Q -end
BLUME. H D Antitrust Division BO/Ofl/11 lp
800701039B Farward"5 ([ocuments mintakenly om:ttpfl from Hartley
documents W/o oitcl
HODQDON.A P Antitrust division 00^0-1/07 lp
BO07310243 Foruiards Commission BO 0537 memorandum t, order containing
d«ci*ions on WB 700302 petition for reconsideration of
7B0413 Mamorandum li order UCB 771104 petition sought action
re fir* prptecilan for electrical cables,
EIBENHUT.D Q Division of Licensing BO/OA/25 S9pp,
B007020577 rtt h receipt nf B009-30 Itr to TX Parks ti MildllFe Dopt
advising that TX Utils Generating Co is nnt jirB|iared to
enter into loasw agreeirent iu/0Hpt covering Snuaiu Creefc
Rflservlor Requests info re ulil intontionB
PHEIBTERrD J Texas. State of flO/06/10 Spp
310
DOCKETED ITEMS
B0073IO3B8 Reviews BOO702 tfraft transmission sv-c settlement agreement
Document found to 6 e unacceptable due to provisions making
ftusbin jurisdictions! aa practical matter For wheeling
"Postage stamp" wheeling rate is not proper in TX
BALDUGH.R C Austin, TX BO/O7/1O 2nj>
— aOQ72BO636 Joint motion for clarification of ASLB B00716 n«Mor4nd-U«
containing decision to reconsider ASLB BGO307 order VB
settlement documents Moves for order establishing schedule
fur production of settlement documents U/Ceftlf Icate of five
FAHRIKANT.R Justi ce. Dopt of QO/07/aS Spp
BOQ7150435 Status rept advising tbat absent change in DOJ policy
posit ion. Lit) 1 mill not be able to reach settlement u/dept
Differences u/NHC re license conditions not yet resolved
Certificate of Svc end
CREEN.DO Houston Lighting t. Power Co BO/O7/11 7pp
B007I5O43J Status ropt 013 settlement negotiat i nns Urges fiO-day
suspension of fltoceecJings.. including hearing date, due to
continued negotiations id/Public Utils Board of City of
Brownsville, TX ^/Certificate of Svc ft pleading before FERC-
STAKL, D M Central & South West Corp BO/07/ n Sbpp
B007300356 Order granting extension until B00731 POT NRC to tuba it
objections ti proposed revisions to B00717 final preho»ring
conference order
HDLFE.S J Atomic Safety and Licensing Board Panel, BO/07/S3 If
H Antitrust hearing transcripts
H007100008 Transcript of B00714 prefiguring conference In Betheada.
MD re settlement negotiations Pp 091-940
» Atomic Bafctg and Licensing Board Panel BO/07/14 7Qpp
Status r-Bpt by Public Utils Board of City of Drowns vi 1 le, TX
re settlement progress City mould not object to further
•i tension limited to 3O days although negotiation* do not
appear- to be fruitful Certificate of Svc encl
PDJR 1ER, M R Brouinsvi 1 1 e- TJ< BO/O7/1 1 App
BQ0715O300 Third status rept nn settlement progress Suggests 30-dav min
extension to pursue negotiations t< to present proposed
license conditions re transmission avcs & other areas
Certificate of Svc encl
CHANAN1A.F D Antitrust Division BO/O7/U Bpp
BO-071&OA2S Status rept re settlement negotiation progress EipreEses no
optimism for agreement u/POJ but agreement ui/WRC may be
reached re license conditions dealing u/bulV pouer wliceUng
rates Certificate of Svc end
SAMPLES.M D Teias Utilities Generating Co K NOTTS , J B Debevolse
* Liberman BD/D7/1I ibpp
B0072S0441 Proposed correction to B00409 prehearing transcript
CartiFicate of Bvc encl
OREEN,D 0 Houston Lighting & Poiuur Co 80/07/22. Bpp
Q Inspection reports- IE Dulletinn !< corrvspondBnce
B00723Dal9 Forwards IE Info Notice 80-12, "InutrUmBnt Failure Ciuin
Opening of POHV !. Block Valve, " No specific action or
response necasaarg
SEYFR1T, K V Region 4i Dallas. Office of the Director BO/03/31.
lp
B0071SO064 Ack receipt of B00109 & 0308 Itrs informing NfiC of it*pl
taken to correct violations noted in IE Insp Ropts
SO-49B/79-20 t SO-499/79-20
BEIDLEiM C Region 4> Dallas' Reactor Construe tiorf ti Englnttrlng
Support Branch SO/04/04 lp
BOO717O3i4 Status rept re development of settlement discussions Urges
denial of atfdl extension of time due to belief that no
•settlement ul 1 1 be reached betueen DOJ & applicants
Certificate of Svc encl
CYPHErtT.8 B Justice, Dcpt nf 80/O7/11 ipp
--BOO71SOO7S Reaponds to NRC 79J213 tc B00320 Itrs re vloUtloni notfrd In
IE Insp ReptB 50-49B/79-2O C 30-499/77-20 Corractive
actions const procedure CCP-4 revised on B00317 to
Incorporate baffle board utd
TURNER, E A Houston Lighting ti Power Co 80/03/18 2pp
8007170338 Second s-tfltus rept re settlement negotiations progrece. Urges
further antitrust settlemeTit efforts to proceod apace w/FESC
settlement due to similarity of issues Certificate of Svc
encl
JOHN, D F Affiliation Unknown BO/O7/1I 6pp
9007210453 Submits status rept of settlement negotiations in Houston
Lighting b Pouer CD et al & TX Utilities Generating Co
Ho it of joint ounersbip agreement -drafts eichanoed
Certificate of Svc end
HURCHETTE.tt H Northcutt El^ BO/O7/11 4pp
B0071&D547 Motion seeking renewal of DOJ BO053J motion to istahlish
trial b other prneedural dates Suggeits B0090B for 6rief»
ti 8O10D6 for commencement of -evidentiary hearing Settlement
foes not appear tn be possible Certificate af Svc encl
D Justice, Dnpt of 80/07/14 t,ff.
80O7a3O5OO Buggpsts recon* i darat ion of BD03-07 di-Jcovery nritar in light
of eitenalve settlement -neqotiations subseq.uent lif conducted
hif all parties !. counsel on 80O1O2
MILLER, M E Atomic Safety and Licensing Hoard Panel BO/07/ti lp
80O7220S56 Order ilenuing petitions far directed certification ui/o
prejudice to r esubmi ssion Pnllouiing ASLB detarmination
BiaHOPjC J Atomic Safety and Licensing Appeal Panel BO/07/ IB
Spp
BO0730O41B Withdrawal -of 79O&1 1 notice of appearance A Fabrikant
responsiblB for all communications until further notice
Certificate of Svc encl
CYPHERT. 9 B Justice, Dept op BO/07/S3 App
8QO72BQ6HO Draws attention tn tun pleadirgs that should be trusted
separate ly slthaujb atapletf tngetJier NRC motlan for
•itenalon of tame & NRC/DDJ joint motion for clarification !•
for en-tabl 1 shment of production schedule
CH/WAN1A.F D Antitrust Division BO/07/25 lp
0007010073 Updates 800331 response to IE Bulletin 79-KB, "Poulbl*
Malfunction of NAMCQ Model EAJQO Limit BuiitcheB at Elevattd
Tump* " No addl Info has been recBived from vendors
TURNER. E A Houston Lighting I> Pouer Co BO/04/3O Spp
B00723071B rtcft receipt of 800130 1 tr from NRC Re»ponst* to notlc* nf
violation. notice of proposed imposition of civil penalties
d Section t> of order to shoui cause ulll be submitted within
ptriods specified in NRC notice & orders
OPREA,Q V Houston Lighting & Power Co BO/09/14 lp
8007240505 Foruards IE Info Notice BQ-21i "Anchorage & Buppnrt of
Safety-Related Electrical Equipment " No written reiponifl
required.
6EVFRIT, K V Region 4. Dallas, Office of the Director BO/05/U
lp,
8007010203 Forward s IE Insp ReptB 90— )<?B/BO-O6 h SO-499/00-OA during
Apr 1980 No noncompllance noted
BE I DEL, W C RUB ion 4, Dallas, Reactor Construction & Engln«*rlng
Support Branch BO/OS/tf 3pp
8007100342 Foruarifs IE Insp Repts SO-49B/80-H & 50-499/BO-l 1 on
BOO 50 5 -OB No noncompl iance noted
BEIDLEiU C Region 4. Dallas, Reactor Construction It Engineering
Support Branch BO/05/B3 Spp
—8007100346 IE Insp Rept* SO-49B/8Q-I J ft 50-499/80-11 on 800903-08. Ho
noncomp liancB noted Major areas Inspected ' const activities
stop work order for HCPB welding ft reactor containment
liner dome Molding
CR03BMAN-W A Region 4, Dallas, Reactor Construction & Engineering
Support Dranch GILBERT, L D , HAfiTIMi L E Region 4, D«ll«i,
Office of tho Director 8O/05/3S &pp
BOO702D233 Foruards IE Info Notice BO -22, "Breakdowns In Cont*Min*tlan
Control Programs " No yritten response required
8EVFRIT, K V Region 4. Dallas, Office of the Director. 80/03/20,
BO07S2BO&S7 Motion for Pi tension until B00731 tn fila objsctloni w/
proposed revision feo ASLB 80O7I7 prehaaring conference
ord«r ti notice of final p>reh*arinn confernnce Ditcusiion* ui/
parties have commenced tc must proceed
LEWIS. B H H«arins Branch a BO/Q7/25 3fp
B007010O37 Forwards IE Info Notice BO-23, "Lost of Suction to Efttrgt
Fiediuater Puirps " No uirltten responfle required
SEYFRIT.K V Raoion 4, Dallas, Office of the Director BO/OD/S0.
DOCKETED ITEMS
311
6007340333 Forwards IE Insp fiepts 50-49B/BO-12 fc 50-199/80-12 on
BO0912-13 No noncomp 1 iance noted
BEIDLE.M C Region 4, Dallas, Reactor Construction & Engineering
Support Branch SO/06/O3 2pp
— 8007240337 IE In«p Repts 50-19B/BQ-I2 & SO-497/BO-13 on 800312-13 No
noncomp tiance noted Major areas inspected observation of
work fc review of records re earthwork Ii concrete,
TAPIA.J I . CRQBBMAN, W A Region 4, Dallas, Office of the
Director HALL. Ft E Region 4, Dallas, Reactor Construction h
Engineering Support Branch HO/06./Q3 6p p
BQQ7IO0433 Updates response to IE Bulletin 79-20 re use of NAM CO Model
EA 1BO st em-mount ed limit twitches No corrective action
required for majority op vendors One vendor still conducting
review b other implBmented corrective action recommended
TURNER. E A Houston Lighting t, Power Co BO/06/04 2pp
BOO7aatX>98 Forwards IE Info Notice 80-26. "Evaluation of Contractor
OA Programs " No written response required
BEYFBIT.K V Region 4, Dallas, Office at th » Director 60/06/10
BO070ZD104 Ack receipt of BOO 3 23 Itr informing NRC of steps taken to
correct violations noted in B00430 notice of violation lc
ord»r to ihou cause, Implementation of eilsting OA/OC
procedures will be focus of follouup insp
BTELLD, V Offic* of Inspection & En forcement, Office of the
Director BO/06/11 Bpp
— SOQ71BOG09 EE Investigation Repts SO-49S/B0-15 A: 50-497/80-15 on
800A05-06 Nu noncomp 1 ianc e rioted Major areas inspected
allegations that consultant firm hao1 recommended const be
discontinued at site fur nne yr
HERR.R K , DRlSKILLxD D , SEYFR1T.K V Region 1. Dallas! Office o)
the Director BO/06/30 4>pp
BQO7Q90246 Revises IE Bulletin BO-OB review aubmlttal date from B00707
to 0304
nPREA. G W Houston Lighting It Puuier Co HO/O7/03 2pp
BOO7S2057B Responds to IE Bulletin 79-2B re list of NAMCd Model EA ISO
stem-mounted limit switches Revi EU of .ill vendors indicates
only one affected Recommended corrective action implemented
OPREA, G W Houston Lighting t. Pniuer Co BO/07/lfl 3pp
S Reportabli
related correspondence
BOO7100443 Second interim defl c i pnc ij rept re damage to Unit 2 reactor
containment bldg steel liner plat? Plate remova 1 li mapping
completed Not interim rapt to he submitted by BQ071 1
TURNER, E A Houston Lighting t< Poiuer CD BQ/Oi/06 4pp
SOO71A02I9 Second interim Part 21 rept re steel liner plate in reactor
containment oldg Progress on repair Includ&s completed
T» maval of dBforffled liner platn & detailed mapping of
removed plate submitted to contractor
TURNER, E A Houston Lljhtina !« Poiuor Co QO/Oi/06 App
B00717OZ03 R>*pondl to IE Bulletin BO-O9 "Kydramotor Actuator
Def Icivnei*! " No taf etij-relat»d By* or component in South
TK Projtct ui*i iubj actuators
DPREA. 0 W Houiton Lighting «t Pouer Co BO/06/13 lp
BOO729O059 Foru«rd« IE Info Notien BO-S9, "Prompt neporting of Info in
Accordance U/10CFR30 9S(«t " No written response roquimd.
BEVFRIT, K V Region 4. Dallas. Office of the Director 80/06/13
BQ0723027B Forwards IE Insp Reptn SO-498/BO-1O & 30-499/BO-10 during
H>y 1980 No nonconpliancD noted
8EIDLE.W C Region 4. Dallas, Reactor Construction tt Enolneering
Support Branch 80/06/19 Epp
— B007B302?2 IE Insp R»pt» SO-49B/SO-10 & 30-499/BO-10 during May 19BO No
noncomp 1 iince noted Major areas inspected structural
backfill, structural concrete, containment tendonti component
itnr*ge ti follouup on const deficiencies
GROSSMAN, U A, . PHILLIPS, H S Region 4, Dallas, Office of the
Director HO/06/17 6pp.
aoti7Z40039 Forward B IE Circular BO-IS, "Lose of Reactor Coolant Pump
Coaling t> Natural Circulation Cooldoun " No written respon"
required
BEYFRIT.K V Raglnn 4. Dallas, Office of tha Director BO/Oi/20
IP
0007070-30i aecond interim deficiencij rept re polar crane rail tie— douin
studs Investigation bg vendor concludes that acceptability
of polar crane hold-doum studs are questionable Brouin & Root
laill Further evaluate sijs Ne 1 1 re>port tn be s«nt fiOOBOl
TURNER. E A Houston Lighting t- Power Co BD/Ob/33 Spp
B0070aO61B RD on 300529, during design revieui, seismic qualification of
essential cooling water intake structure gantry crane ft
dlesel generator fuel storage lank found ^/deficient
rosponse spectra values NEUJ SUISHIL^ pvaluatlofi in progrnss
OPREA, 0 W Houston Lighting EC POUJDI- Co BO/0&/26 4pp
BOD70903fa5 Interim deficiency rept re breatdouin in quality program For
concrete placement CI1-W9O Hroun h Root continuing
investigation of condition's (• eiamining documentation ti
physical quality of placement
OPREA, O W Houston Lighting & Pownr Co BO/O7/O3 3pp
B007110337 Advises that 8006O9 potentially raportabU deficiency re
concrete placement in dlescl gcn-eratDr bldg is not
rapoT-table under 10CFR50 SS{e)
DPREA, 0 H Houston Lightins J. Pouier Cn 80/07/0^ 3pp
flOO71SOti4B Final dBficioncy rept re reactor vase*! outlet noule aafe-
ends Evaluation shows that condition would not adversely
affect safety of plant operation Natter considered not
T-eportabla under IQrFRSO 35(e)
DPREA. 0 W Houston Lighting 5. Pouier Co BO/07/O3 3pp
BO07BBO132 Forward* IE Investigation Repts SO-49B/BO-09 b SO-499/00-O9
Dfi B00410-1B No noncompliance noted
SEYFRIT.K V Region 4, Dallas. Office of the Director 00/06/33,
Off
80O716O601 Forwards interim deficinncg ropt re linear plate bulge
repair Next rept ulll be submitted S1010O1
OPREA, 0 W Hnuston Lighting & Power Co BO/07/11 3pp
— SOO7&B0137 IE Investigation R*pts 30-498/80-09 Si 30-499/BO-Q9 on
8O0415-1B No noncompliance noted Major area investiflaled
• negation that Broun !< Root, Inc atttmpttd to intimlditv QC
inspectors d •rnplou"** into covering up const defects
BEYFRITiK V , DRIBK1LL.D D , BACIiP E Region 4. Dalian Office of
tli* Director BO/06/19 lOpp
B007l7O&7o Forwards IE Circular BO-14, "Radioactive Contamination oP
Plant DimlneraHzed Mater But b Resultant Intvrnal
Contamination of Pei-Bonne.1 " No written response rsfiulred
SEYFRIT.K V Region 4, Dallas, Office of the Director 60/06/24
BOOTH 3 03 64 Forwards IE Bulletin 8O-16, "Potential Misapplication of
Rucemnunl; Inc Models list tt 1192 Prirssure Transmitters
H/Etthir A or D Output Codes. " Written response required
IE Circular BO-16 also end No written response- required
BEYFRIT.K V, Reflion 4, Dallas, Office of the Director 60/06/27
in
B0071S0007 Forwards IE Iitv**ttg*tian Hepts 50-498/8O-I5 fc 90-499/BO-15
on 800603 -06, No noncompliance noted,
HEYFRITiK-V. Reoion 4. Dallas, Office of the Director BO/06/30
— BO071fi06O9 Jntorim doficiency rppt re linear plate bulge consisting of
Ionic for linear plate bulge repair
» Houston Lightins & Power to (JO/07/11 lp
G-OO7S1O511 Third inturirn deficiency rupt re damage to steel liner in
reactor containment bldg Logic for liner bulge repair enc 1
Next rept will be foruiarded bij 801001
OPREA, 0 W Houston Lightino R Pquier Co 80/O7/I1 flpp
BO0729O441 Part 21 ropt re latent matl nnncomp I lances In A6ME Section
III pipe supports supplied tiij UPS Industrie* Initial review
indicates no deficiency since nupporla are u-sed in
nonualding applications
RICE. W H Elroun t. Rout Co-rp (subs of Halliburton Corp )
BO/07/11 3ff
8007230913 First interim deficiency rcpt re breakilouin in Droun & Root
QA program rs> procurement cycle of purchased matls at
facility, Procedureo for procurement cycle control b all
vendor-ruin ted activities *( records under review
OPREAfO W Houston lighting & Poucr Co BO/07/14 5pp
BOO7330S23 Interim do f i tienc ij itept re ifiesel gHnerntor fuel oil tank
room BI haunt Fans P«r commitments in PSAR I. FSAR, fans must
be connected to Class IE pouior Fans not supplied from Cla-ss
IE source Corrective actions being evaluated
OPREA. 0 W Houston Lightinn & Pouer Co BO/O7/16 app
312
BOD7230476 Interim deficiency reft re min/mai soil density test on
essential cooling udter backfill Detailed info re deficiency
uiill be provided to NF1C as pflrt fit response to 1 t*m S.rtjp AP
of 8QQ43Q order to show causp
OPREA, Q W Houston Lighting S. Power Co SQ/Q7/17 3pp
HQ0733O540 Inters™ deficiency repl re mat! control of ASTM fl-355
structural steel bolts Improper segregation -of Category I &
non-Category 1 structural steel bolts in Field resulted in
bolts procured under non-Cat-eg ory 1 specs
QPREA,G W Houston Lighting !< Pouier Co BO/07/17 4pp
HO0730O3B2 Inlenm deficiency rept re re-evaluation of piping melds
previously found acceptable Liquid pent'trant rctest by
Southwest Rosefli-th detorminotl that eight melds exhibited
lineal indicatiuns in cict-sa of code limitations
DPREA, G W Houston Lighting * Pouier Co BO/O7/2fl 3pp
DOCKET BTN-SO-302 HAVEN NUCLEAR PLANT, UNIT 1
A Ap?! ica tinn/construc tion stage documents d correspondence
0007230-001 Forwards statement nf policg re requirements to be nit for
current OL appl Uations, aa derived from NUREQ-O66O & found
In NUF1EO-0694
EIBENHUT.D O Division of Licensing 00/06/26 3pp
0 ftd jud icatory correspondence
3007330802 Motion for termination of proceeding Director of Gfc of
Nuclear Reactor Regulation notified on 800517 re withdrawal
of application Certificate of Svc encl
CHURCHILL, H H Wisconsin Electric Pouier Co CHURCHILL, fl W Sh4M,
Pittman, Potts t, Trou&ridoe BO/07/17 4pp
U Cong r ess irnia 1/Eirc utive Correspondence
80073003-65 Requests testimony presented at 80062"? committee hearing
issues relating to const oF nuclear pouer plants
ECKHrtKDT, B House of Flop , Interst (. Foreign Commerce BO/07/11
DOCKET 50-900 DAV1B-DES9E fJUCLErtR POWER STATION, UNIT a
A ftpp 1 itatioo/c nnstruc t ion stsage documenta * correspondence
0007230001 Foriuflrdi statement of policy re requirements to be met for
cur-rent OL appl Icationai as derived from NUn£Q-0660 S. Pound
in NUREO-Otgl
ElHENHUT.Dfl Division of Licensing BO/OA/26 2pp
00-07310314 Responds to applicants' BQ0717 motion to termlnatit
procreding Mo objection to termination or to applicants
BOOS17 uilthdrauiol of application Certificate of Bvc enel
ODLDBERO, B C Hearing Branch 2 00/07/29 3pp
DOCKET STN-30-30B WPPSS NUCLEAR PHDJECT, UNIT 3
A Application/construction stage documents !< corre«pand«nc«
B007H30O01 Foruiards statement of policy r« rffquirementi to be *it far
current OL ajipl icatl onsi as derived from NUREO-0660 i< found
In NUREO-0694
i D 0 Division of Licensing 0Q/0&/2& Spp
F 9ecurit^, mBdlcal, en»ergenci| & fire protection plant
Q AJ judicatory cnrrespondenc e
Foriuards Pages 4, 5 !. 6 uililch ware inadvertently omitted
from Exhibit A of High RocV Lake Association £300321
affidavit
SPRIHGER, [> Higti RocV Lake Association BO/05/S3 1(1
0007300341 Forwards map, overlay, table & methodology baift r<* tnorje
evacuation time estimates per NRG 800703 request
RENEIEROER.D L Washington Public Pouer Supply System BO/07/24
llpp
0 Adjudticatory correapondnnce
8006200071 Pages 4, a & 6 Por Eihibit A of High- Rotk Lake As
B00531 JiPfidnvit
SPRINGER, 0 High Hock La \> e Association 70/11/16 4p|>
H General c orrespondonco
BQ0731&Q4B Responds to inquiry re flooding af site Natural phenomena
considered in plant design ft const Access to A from plant
during flood considered in eitiergenitij plan In Flood -emergency
rail, boat or OKU transportation uil 1 1 be utiliieiT
KEPPLER.J O Region 3. Tliicaoo. Office of the Director BO/05/2S
2pp
8007020053 Responds to 800930 1 tr re J Dranum innulry about Facility
eipansion Counsel for applicants requested that ASLAD
terminate pro-c yed ing B on CP applications due to reduced
groiiith projections It financial constraints No action taken
Dtncna.H J aftift of the Executive Director for Operations
90/06/20 lp
DOCKET 50-901 DftUIS-EESBE rJUCLE^R POWER STATION. UNIT 3
A Application/construction &tage documents Ir cor-respondence
B00723000I Forwards ntatement of policy ve requirements to be met for
current OL app licat i onsi as derived from NUREO-DiiAO b found
in NUREO~069-4
EIBENHUT.D 0 Division of Licensing BO/O6/26 2pp
H General corro5,pond*nco
60O729004a Responds lo inquiry re flooding of site Natural phenomena
considered in plant design ;f eonbt At tea a to ti from plant
•during flood consider eJ in emergency plan In Flood emergency
rail'boat or "HU transports 1 1 on wilt b-u utilized
KEPPLER.J 0 ffejion 3, CMcago, QFPUfl of tJiff Director 80/03/58
BOD73102')3 Forward t Commission BOO 527 memorandum tt order con to in inn
decisions on UC9 7BOS02 putitlon for reeontlderntlon of
7B0113 memorandum t< order UCS 771104 petition sought action
re fife protection for electrical cable*
EIBEHHUTiD 0 Division of Licencing 00/06/23 B9pp
Q Inspection reports, IE Bulletins & correspondence
8007330007 Forwards supp 1 info to 790323 rftEponie to IE Bulletin 7B-13
Record search in response to C-E repti "Atypical Meld Matl
in Reactor Vessol Welds, " produced no svidence of us» of
atypical ueld matl in reactor pressure vessels
RENDERQER.D L Vloshington Public Pouer Supply System BO/03/17.
B007390403 Foruiards inop program committed to in 790710 responta to
IE Bulletin 79-O3 re longitudinal ueld defects in liainl***
steel pipe spools No evidence of longitudinal uield defacti
UIBI found
R£NBEROER.D L WanJiJngton Public Pouer Supply System SO/04/19
33pp.
0007180023 Forwards IE Insp Repts 50-SOB/00-05 b 30-309/BO-OS on
000313-19 No noncompliance noted
EOOK, H E Region 3, Ban Francisco, Fuel Facility li Mlteri'l* 9>fltSI
Branch QO/O5/Z3 2pp
—8007180039 IE Insp HeptB 50-509/80-03 ti 30-S09/BO-OS on BOOS13-1S NO
noncompliance noted Major areas Inspected organization 4
administration, procedures, audi ts Si CP requirements
YUHAB, Q P , UENBLAWSKI'F A Region S, San Francisco. Offiet of thi
Director, HOOKj H E, Replan S- Ban Francisco, Funl Facility h
Materials Safety Branch BO/O5/3a 9pp
8007B203S2 Foruards IE Info Notice BO-H6, "Evaluation of Contractor
OA Programs " No written response required
ENGEUHEN.R H Region 9, San Francisco, Office of the Director
B0/0i/10 lp
SOO7020O53 Reapo-nds to GOOS3O I tr re J DrlnPm Inquiry about facility
*ipansion Counsel for applicants Toquested that ASLflO
terminate proceedings on CP app! liations due to reduced
growth projections & financial constraints No action taken
DIP.CKS.H J DffiLE of the E<ecutivB Director for Operations
BO/04X20 lp
6007300306 Responds to IE Bulletin BO-09 re damage to chtmic*! vol
control sys tanks Tanks adequately protected against vacuum
damage Holdup tanks equipp-ed in/vacuum breakers Equipment
drain tank designed for full vacuum u/nltrogen cover QBE.
RENBEHOER, D L Washington Public Power Supply Syctem BO/06/18
Spp
DOCKETED ITEMS
313
BOO72*?009O Foruards IE Info Notice BQ-2B, "Prompt Rep or tins of Info in
Accordance W/1OCFRSO 39(«( " No written response required
ENOELKEN'R H Region 3, San Francisco, Office of the Director
BO/06/13 lp
BOO7D2O46& Forwards IE Circular 80-15, "Loss of Reactor Coolant Pump
Coaling fc Natural Circulation Cooldoun " No written rospon«e
raqulred
ENOELKEN.R K Region 3. San Francisco, Office of the Director
80/O6/HO lp
8QQ71B0299 Forward* IE Circular SO -14, "Radioactive Contamination of
Plant DeMinerali ied Mater Sijs & Resultant Internal
Contamination of Personnel " No written reBpon*e required
ENCELKEN.R H Region S, Son Francisco, Office of the Director
00/06/24 lp
BOO7230401 Forwards IE Bulletin 80-14, "Potential Misappl icatlon of
Roianount Inc Mod n Is 1151 fc 1192 Pressure TramsmlttetB
H/Eithir A or D Output Codes " Writ tun response required
IE Circular BO-li alto and, No written response required
ENOELKEN.R H, Region 3, Ban Franc He o, Office of the Director
BO/Qi/a7, lp
~a0071B0025 IE Inap Repts SO-SOS/HO-OS «. 5Q-S09/BO-O5 on 000313-15 No
noncomp 1 lane o noted Major aroaa inspected or gani I ation t.
adroi nistra tl on. procedures, aud its t- CP requirements
YUHAS, G P , WENSLAWSHI.r A Region 5. Ban Francisco. Office of the
Director BQQK.H E Region 3. San Francisto, Fuel Facility &
Materials Safety Branch BO/O5/2H 9pp
BOO7220252 Foriuards IE Info NotJto 80-36, "Evaluation of Contractor
<JA Programs " No written response required
ENQCLKEN.R H Region S, Ban Francisco, Office of the Director
eO/06/10 lp
BO 07 3 003 Ot, Responds to IE Bulletin BO-OS re damage to chemical vol
control sijs tanks Tanks adequately protected a gainst vacuum
damage Holdup tanks equipped lu/vacuum bi eaters Equipment
drain tank designed FOT full vacuum w/nitrogen cover gas
RENBEROER, DL Washington Public Power Supply System BQ/06/12
B007290O9O Forward! IE Infn Notice BQ-SS. "Prompt Reporting of InPo in
Accordance W/1OCFR3Q 33{ol " No written response required
ENGELKEN.R H Region S, San Francisco, Office of the Director
BO/Oi/13 lp
BOO71B0389 Responds to NRC BOQiO? 1 tr re violation* noted in IE imp
on BQOS20-23 Correctly* actions' uti 1 has established hold
point to visually Inspect all accessible Interior/exterior
A8MC Sec ton III spool uelds
RENBER6ER.D L Washlnoton Public Power Supplg By it em 8O/07/11
BOO7020466 Foruards IE Circular BO-15, "Loss nf Reactor Coolant Pump
Cooling t Natural Circulation Cooldouin " No urltten response
req,iiirod
EMOELKEN-R H Region 5, San Francisco. Office at the Director
BO/06/ HO lp
U Conor e*slonal/E«ecutive Correspondence
BO073003&7 Submits question* re unusual financing arrangement between
util b Bonnevllle Pouier Administration Related
correspondence
HE AVER, J Home of Rep BD/O7/14 3pp
DOCKET BTN-3n-309 WPPBfi NUCLEAR PROJECT, UNIT S
A App llcatlon/conttructlon ctagi -documents & correspondence
B007230001 Forwardi statement of policy re requiremBntft to b« mat for
currant OL applications, at derlv*d from NUREO-OAiO t found
in MUREO-0694
EIBEHHUT.D S. Divided of Licensing B0/06/3i Spp
F BecurltUi medical, emergency Si fire protection plant
BQQ73QO344 Forwards mnp, overlay i table fa methodalogij basis re emorgencg
Bvacuation time estimates per NRC SO 0702 request
RENBERQERiD L Mashlngton Public Pouier Bupplg Bgitem 80/07/24
llpp.
0, Adjudicator^ corraspondeiice
BOO73 10243 Forwards Commlision BOO 92 7 memo rand urn fa order containing
decision* on UCB 7B03Q3 petition for reconiidora tlon of
7BO413 nemorandum Ii order UCB 771104 petition (ought action
re fire protection for electrical cables
EISENHUT, D 0 Division of Licensing BQ/Ob/33, Q9pp
fiOO71GOa99 Forwards IE Circular BO-lfl. "Radioactive Contamination of
Plant Domineral lied Hater BIJS & Resultant Internal
Contamination of PerBtmnel " No written response required
EMOELKEN,R H Region 9. San Francisco, Office of the Director
80/04/-24 lp
BOO7230401 Foruards IE Dulletin EJO-16. "Potential Misapplication of
Rosemount Tnc Models 1131 tt 1152 Pressure Transmitters
H/Elther A or D Output Codes " Written response required
IE Circular 8O-I6 also enc] No turitten respunso required
ENSELKEN.R H Region 5. Ban Francisco, Office ttf the Director
BO/Oi/S7 lp
B0071B0329 Responds to NRC 9DO6O9 1 tr re violations noted in IE insp
on 800530-33 Corrective actions util has established hold
point to visually Inspect all accessible inter 1 or/ei terior
ASHE Secton 111 spool uelds.
RE.K8ERGER.D L Washington Public Pouier Supply System BO/07/11
4p|>
DOCKET 50-513 WPPBS NUCLEAR PROJECT, UNIT 4
A Application/construction stage documents b correspondence
B007O30197 ForuiardE organisation charts for Ofc of Nuclear Reactor
Regulation effective BOO42B States moans of appeal of staff
posi ti on
TEDESCD.R L Assistant Director for Licensing BO/0&/12 Spp
0007330001 FnruiariiB Btatomant of policy I-B requiremant* to be met for
current OL app 1 ications. as rierivprt from NUREO-OddO & found
in NUR £0-0674
EISENHLIT, D O Division of Licensing aO/Oi/2i 3pp
Inspection reportfi IE Bulletins It
B007B30007 Foruiardt sttppl info to 790 32 S response to IE Bulletin 78-12
Record search in response to C-E rept> "Atypical Meld Hatl
in Reactor Vaisel Welds," produced no evidence of use nf
•typical ueld matl in reactor pressure vessels
RENBEROER, D L Washington Public Power Supply Bustttm BO/03/17
Ip.
BO07S90409 Forwards insp program committed to in 790710 response to
IE Bulletin 77-03 re longitudinal ueld defects in stainless
• teal pipe spool* No evidence of longitudinal uield difectt
was found
REWBERGEfl, D L Haihington Public Pouier Supply Suitem BO/04/15
33pp
8007180023 Forwards IE Imp Repts 30-30B/80-OS ti 90-S09/BD-O9 on
HOOS13-13 No noncomplianca noted
BOOtt.H E. Region S, Ban Francisco. Fuel Facility b Materials Safety
Branch BO/05/23 Qpp
8007310392 Ac k receipt of NRC 9DO4GO Itr approving rotiUHnt to
discontinue certain aquatic nonl t onng d requesting copies
of util submlttals to State of Wft re water quality NRC does
not have authority to require uatnr quality filings
RENBEROEFi. U L Washington Public Pouier Supplg System BO/D7/14
3pp
BOO7SS0544 Forwards "Re 1 1 abi 1 i tij Evaluation of UPPS9 Nuclear Projects
Numbers 1 fa 4> " in response La NRC BO 01 24 request for
evaluation of loss of main feeduiater event
FENBEROER.D L Washington Public Power Supplij System 60/07/23
Bpp
— 8007230332 "Reliability Evaluation of HPPSS Nuclear Projects Numieri
1 b 4, " Vol l,main rept
MCDftlDE.A f , MINftRICK, J W , DOZARTH, D P Science Applications,
Inc BO/07,/16 HMpp
ft Adljud Icatory corre spotidentc
BQQ731O243 Foruards Comrai ssion BOOS27 memorandum h order containing
de-cisinns an UCS 7B0503 petition for reconsideration of
7B04I3 memorandum !. order DCS 771101 petition sought action
re fire protection for electrical cablos
EISENHUT.D 0 Division of Licensing BO/Oi/H5 B^pp
314
DOCKETED ITEMS
0 Inspection reports. IE Bulletins I, correspondence
aD072?Q444 Respond* to IE Bulletin 80-03. "Lasa of Charcoal from Bid
Type II,Tiiio-Inch, Tray Adsorber Cells " Standardiied 31 5 X
23 inch. flat bed,Type II charcoal adsorber cell unite used
in all cleanup sys
RENBERQER.D L HasJiinolon Public Pouer Supply Bustem 60/03/19
apt-
8007320352 Forwards IE Info Notice BO-2i, '•Evaluation of Contractor
OA Programs " No written response required
ENOELKEN.fi H Region 3. San Francisco, Office of the Director
[p
6007300299 ForuariJs response to IE Bulletin SO-O5 re vacuum damage to
chemical control sgs tanks Design changes to law pressure
process tanks not required Table describing subj lanlis ii
protection provided end
REN8ERQER, D 1. Washington Public Power Supply System SO/O6/12
lOpp
BOQ729O09O Forwards IE Info Notice 6O-3B, "Prompt Reporting o-f Info in
Accordance W/IOCFRSO 55(e> " Ho written response required
ENGELKEM. R H Rug ion 5j San Francisco. Office of thi Director
BO f at,/ 13 lp
OOQ7C-3CJ46A Forwards IE Circular BQ-15, "Loss of .Reactor Coolant Pump
Cooling b Natural Circulation Coolrfoun " Mo ui-itten response
requi red
ENOELKEN.R H Region. 5, San Francisco, Office op the Director
8D/0&/2O lp
a00718O2<?9 Forwards IE Circular BD- 14, "Had inactive Contamination of
Plant Demineral l led Mater Sys Si Resultant Internal
Contamination of Personnel " No written response required,
ENOELKEN.R H Region 3, San Francisco, Office of the Director
8O/O4/24 lp
BQ07S304Ok Forward i IE Bulletin BO -I fa, "Potential Misapplication of
Ro»t mount Inc Models 1131 fc 1153 Pressure Transmitter*
M/EitJier A or D Output Codes " Written response retire*
IE Circular HQ-16 also encl Ha written response required
EHOELKEM, R K Region 5, San Francisco, Office of the Director
60/06/27 1 p
8007070026 Responds to Attu general, State of IL rtqueit for rfa
re HBC decision to issue suppl to final EIS for facilities.
Forwards documents listed in App A
FELTON, J H Division of Rules and Record* BO/06/ 11? 3pp
— S007070Q31 Discusses alternate *lte revieuia on pending cai*t r»
assessment of effort & impacts involved in upgrading
alternative site analyils section of FE8 Provides detailed
description of active cases
HEOAN. H H Assistant Director for Environmental Project!
7B/O6/OH 4pp
--B007070033 Discusses facilities alternative, fit* reviews. R»a,u«»tl.
reviem of alternative site isnj*i Including conmenti •• to
deficiencies in light of Board decisions
BAU-AF1D.R L Environnental Projects Branch 1. 7B/07/1B, if.
— 0007070036 DiscutBH facilities' altern«tlve »it» analyili.
FEB IB insuff itiunt List* def iciencies undtr Pilgrim tc
Seabrook Applicant hai not madt explicit environ comparison
of -alternative site* investigated
LAURENCE, J F Hear ins Branch 4 7B/Q7/24 Hpp
—B00707O040 Discusses facilities' •Iternate site rtan*l««ii. Li it»
rfeflclenclei in FEB needino correction. Forward* approirlat*
ftitfiodolugg for conducting ult*7native site an*lu,*ls In
light of rectnt adjudicator", d»ci«ioni,
LAURENCE, J F Hearing Branch 4. 76/08/01 8pp
— B007070O44 Discusses revleu of alternative site record In 11|>I of
Board decision! RecaiMiends need to >uppl*ntnt prevent
racord. indicating further etpllcation of proc**«et ui*d Ir
bas» for vieu of relative desirability of available »itt»
LAURENCE, JF Hearing Branch 4 7B/00/02 2pp.
—5007070046 Notion for leave to supplement record re «I ttrn«tive> »itei.
based on guidance found in Pilgrim decision
BQHDENICK. B H , LAURENCE. J F Hearing Brunch 4, 70/06/03 fl»i,
—8007070047 Foruiards schedule for alternatlv* site review for
facilities. Verbal assessment op deficiencies h*ve been
provided Ltr of authorization is being drafted
UATKENB.D Building b Operation* Branch 7B/OB/11 Sip.
B007S90B13 Responds to IE Bulletin BO-OS Problems r« containment line-r
pentratlon ueld do not exist at facllitg Design for primary
piping typical of ABME code c onf jgurat i ons Process pips/
flued head assemblies not installed
FEMHEROeH.D L Washington Public Pouer Supply System BO/07/10
Spp
3 Bep-ortabla oc currenc esi !.ERs Jcrelatod correBponaenr e
BOO7170577 Foruiards interim defitiency rept re defective condition in
design of Floor mpporting component coaling d makeup pump
area Ji Bating, ventilation ft air conditioning sus Train B
cquf pnent
BENflEHOEH.D L Washington Public Poiaer Supplu Ggstim BO/07/11
— B007070030 Order approving 7BOBOH motion for luave to tUppl*M«nt r*C»T<
as tn alternative *1 tei for facilities,
YORE. J R Atomic Safety and Llcenttlng Board Panel 7B/08/17
Hpp
— B00707OOS3 Forwards tentative schedule for conduct of addl altornativ*
site asBtsiment fc NRC technical t> legal questions •« result
of preliminary review of FESiCP fa environ rept on
alternative sites Provides author! lation'to pruceed M/work.
MODRE.V A Asstitant Director for Environmtntal projeett
7B/09/33, Spp
—S007070035 Responds to 7B09SB req.u»«t Forwards InCo f« C»»« tonllftln)
of or having potential of addl alternative slta studies.
MOOfiE.V A Assistant Director for Environmental Projects
78/09/20 4pp
— BOO7I703B-S Interim deficiency rept re defective condition in floor
supporting component cooling & mafteup pump area Caused bv
usage of incorrect vertical amplified response spectra,
Structural frame designed for installation
» Washington Public POIUET Supply System BO/07/11. 2pp
DOCKET 50-514 PEBBLE SPJUWQ8 NUCLEAR PLANT. UNIT 1
A, AppHcatlnn/collstruclio.™ stage, documents & correspondence
B007Q2O2i65 Forwards NRC dfc of Nuclear Reactor Regulation BQ042B
reorganization chart Necessary period of transition made
u/m»n disruption to ongoing activities
TE&EBCO, R L Assistant E>trcntDi- for Licencing BO/Oi/13, 2pp
B007230001 Forwards statement of policy re requirements to be met for
currant DL applications, ai derived from NUREO-0660 & found
in NUREQ-0&74
EISENHUT. D G Division of Licensing BQ/O6/26 Spp
F Securltyi medicali emergency & fire protection plan*
S007270B2S forwards "Evacuation Time Estimates For OUJi«» fc Morro.*!
Countlva.DR d Kllckltat Count \|,UA in respons* to BOO/Oa
request. Advises that NRC responded to 791236 request on
BOO404 Study found no unusual evacuation problem,
LIMDBLAD, H J Pacific Oat & Electric Co. BO/O7/HS lp.
— BOQ7290032 Forwards "Evacuation Time Estimates for OilUam I. M&frow
Counties, OR & Kllckltat Countu.MA per 791226 reo.ueit,
Pntliminaru study revealed no unusual evacuation problems.
LINDBLAD.U 0 pacific &as b Electric Co BO/04/04 lp.
— B007290B3S "Evacuation Time Estimate* For Oilliam Ir Morrow CountlM.W
tc Kllctltat County. MA "
» Pacific Oas (< Electric Co BO/03/31. Stpp.
O Adjudlcatory correspondence
D ^NRC Draft/Final Environmental Statements, iupple & correspondBnce
3007070028 FOIA request from Atty Oaneral , State of IL for documents
re NHC decision to issue BMP pi to Final E1B for facility
HANSELL-D Illiridis, State of 3O/O5/aB ffpp
B007310S43 Forwards Commission BOOSH7 memorandum ti ardei- containing
decisions on UCH 730302 petition for reconsideration of
780413 memorandum h ordor UCB 771104 petition sought action
re fire protection for electrical cables.
EISENHUT. D 0 Division of Licensing. BO/Oi/SS a?pp.
DOCKETED ITEMS
31 E
BO0717O201 Notion for postponement oF BOQ723 pretrial couf erenco rt
early site suitability hearing issues Suggests conference
call to hear applicant objections Stats nf OR C> L.K harbet
have na objection to posta onemsnt Certificate of Svt enel
BDflDENlCK.B II Hearing Branch 4 SO/O7/15 bpp
Q Inspection reports, IE Bulletins d correspondence
8O072SO239 Forwards IE Info Notice BO-26, "Evaluation of Contractoi
4A Programs " No written response required
ENQELKEN, R H Region S, San Francisco, Office of the Dimeter
BQ/OC./1O It>
-3007070055 Responds to 76O928 remie-st Forwards info re tasef
af or having potential OF addl alternative- site studies
MOORE, V A Assistant Director for Environmental Projects
7B/O9/2B 4pp
i st Ing
Becuritv medical, emerijencij d fire protects
p lans
HOO7a9OB23 Forwards "Evacuation Time Estimates Far Qllllam
Counties. 03! & Kl let i tat Count g.WA in response to BOQ7O3
request fldvi sos that NRC responded to 791226 request on
B00flfl4 Study found no unusual evacuation problem
LINDBLAD.W J Pacific Oas t. Electric Co 00/07/25 Ip
DOCKET 30-515 PEBBLE SPRINQ8 NUCLEAR PLANT. UNIT 2
A Application/construction stage documents b correspondence
Forwards "Evacuation Tirao GstiraataE for Qilliam It Morro
Counties. OR t. Kllckitat Cn\mtij.VJA per 7*tl33t, Toquest
Preliminary etudi) revealed no unusual evacuation problems
J Pacific Gas I, Electric Co BO/04/Q4 ]p
8007030265 Forward i NHC Qfc af Nuclear Reactor Regulation Q0042B
reorganii at ion chart Necessary period of transition made
afmin disruption to ongoing activities.
TEDESCQiR L Assistant Director for Licensing HO/Ot/13 2pp
8007230001 Forwards statement of policy re ranv Irementi to be met -for
current OL appl Icat Ions.<ai derived from NUREG-OiAO b Pound
in IWREC1-0694
EISEHHUT.DO Division ot Licensing BO/O6/2i Sp p
D. WC Draft/Final Environmental Statenvnts> tuppls fe correapondene
-a0073'?OB35 "Evacuation Time Estimates For Ollliam 5. Morrou Counties. OR
b Kllckitat County. HA "
* Pacific Gas f. Electric Co 80/03/31 21pp
S fid judi catory c
3007310243 Forwards Commission 800527 memorandum ti order tnn tain i 113
decioinns on UC8 VS0502 petition for reconsideration of
7BO413 memorandum 6 order UCS 7711Ofl petition Enught action
rn Fire protection For Blectrlcal cables
EIBENHUT, D O Division of Licensing SO/06/33 B9pp
BO07O7002S FOIfi r-»que«t from Atty Otneral. Btato at IL For documents
T» NRC decision to i si lit auppl to final EIS fur facllltu.
HANSELL.D Illinolu State of 0O/05/28, 2pp.
BOO7070026 Rflcpondc to Atty General, State of IL ra^uBst for documents
r* NHC iliclBlan to lnue suppl to final EIS far facilities
Forwirdi doGirnints listed in App A
FELTON.J M Division of Rule* and Record* BOyfli/19 2pp
— 3O07O70D31 DiicuBtet alternate site revleus on pending eases re
• •*e**m.tnt of »ffort b impacts involved in upg-rading
alttrnativff iit« anBlifBii section of FES Provides detail ad
ducriptlon of active cans
REOAH.H H. A»*i*tant Dirsttor for Environmantal ProjectB
78/06/OB 4po
— BOO7070O33 Discii9i»» facilities. altBrnatlve tits revlows F?*quBst5
revleu of alternative »itB 1 »CUBB including comment* as to
def Identic* in light at Dqard d»cis.iona,
BALLARDiR L EnVirOTlmental PrDJBct* Branch 1 7Q/Q7/IB Ip-
— 8OO7070O36 Dt BCUBSBB fjciHtien.' al ter-nat t VB site analyst*
FES !• Insiffflcient. Lists deficiencies under Pilgrim fc
a»ibroot Applicant hai not made tiplicit invlron compa-rlian
of slterratlVfl Bites investigated
LAWRENCE. J F Hearing Branch 1 78/07/34 2pp
— 8O07070O40 Dlicussei f»ctliti*i' alternate site reanJlysii Lists
deficiencies in FES n ted ing c orract inn. Forwards approp-rlati
nfethodolony for conducting alternative nit* (tnalgsl* In
light of recent ad judicatorij decision.*
LAWRENCES F Hearing Branch 4 7H/OB/O1 2pp
800717O3O1 Motion For pos tponeniEnt of 800733 ^retrial conference Tt
early site auitabllitij hearing issues Suggests conference
call to hear applicant objections State of OR t. LK Martet
have no objection to postponemBiit Ccrtiflcato of Sue end
BOHDENICK, 0 M Hearing Brflnih 1 BO/O7/1S dpp
Inspsction reports. IE Bulletins !« correspondent
6007230239 Faruardfl IE Info Notice 00-26, "Evaluation of Contractor
QA Progranii " Wft iiirltten resjonsB required
EN3ELKEN.fl H Region 5, San Francisco, Office of th« Director
00/06/10 Ip
DOCKET STN-5O-516 JAMeSPOHT NUCLEAR STATION, UNIT 1
A Application/construction stage documents & correspondence
BQ07230001 Forwards ntatement -of policy re rcquir*ment» to be met Cor
current OL app 1 test ions, as derived from NUREO-OAdO t< Found
in NUREG-Oti<7<l
EISENHUT.n 0 Division of Licensing 80/O6/26 2pp
H General correspondence
aoo71BO042 Respond-s to 800123 Itr ae NDC apprortcft to emergent!/ planning
a-round nuclear plants Commission endorsed MUREQ-0396 for
rie-vo 1 opraent of stiite & local radiological ^ lans Eiatt
configuration of so nee ulill be decided during plant review
DENTONi H R Office of Kuclrsr flcactor Regulation. Director
BO/Ofi/03 2pp
-9007O70O44 Discusses review of alternative tit* record in light of
Board decision* Recommend* need to nipple/mint prevent
rtcordi indicating Further explication of processes gsed &
basil far vieui of relative desirability of available sites
LAWRENCE, J F Hearing Branch 4 79/06/02 2pp
— H0071BQ047 Requcats that NRC amend proposed regulation re formulation
of evacuation plan to Include all territory ea»t of
facility Proposc-d 10-mile rail in a 11 unuiorbrible for people of
Long Island Itesponsibla plan fjiould be developed
DEHAN.O L NBUI Yor*. State of 00/01/23 Ip
-B007O70046 Motion for l»ave to supnleinent recoril re alternative sites,
based on guidance Found in Pilgrim decision
BORDENICK.B M . LAWRENCE, J F Hearing Branch 4 7B/08/03 Spp
"BQ07O70049 Forwards tchgdul* for alternative site review For
facilities Verbal asusijntnt of deficiencies have been
provided Ltr of authorli*tion 1» being drafted
MATK1NB.D. Building b Operations Branch 7B/OB/11 2pp
-BOO70700SO Order approvinj 78OBOB motion for leave to supplement record
•• to alternative sites for facilltlei
YOREiJ R Atomic Safety and Licenslnj Board Panel 78/OB/17
Q Inspection reports, IE Bulletin* h rorrespDndenco
BO-07O1O2SO ForuiarilK IE Info Notice £30-33, "toss of Suction to Emergent".
FoeJuiatDr Pumps " No written resp-onso reiuirad
CRIER, B H Region 1> Phi lailelph ia, Office of the Director
BO/0 5/29 Ip
GQD7O1 00&6 Responds bo IE Bulletin UO-OSi "Vacuum Condition Resulting
in Damage fco Chamical Vnl Control Sij s (CVCBI Holdup Tanks "
Engineering activities huv« been curtailed to point where
detail design data requested is unavailable
PLABKON.R E Lono Island Lighting CD BO/0&/O5 Ip
— B007070O33 Foruards tentative schedule for conduct of adtfl alternative
• Ite aggflvamtmt tc NRC technical b legal qu«»tlons as result
of preliminary review of FES, CP !< environ rapt on
alternative sites Provides authorisation to- proceed ui/uorl
HOORE.VA A»9iatant Dlreetor for Environmental Projects
76/09/29, 9pp
8007210571 Forwards IE Info Notice 80-2i, "Evaluation of Contractor
OA Progrsms " Ho m-rltten response requii nd
ORlERiB K Region t- PhDatfelp h i a. Office ot the Director
80/O6/10 Ip
316
DOCKETED ITEMS
B007 1 fcQflO I Forwards IE Info Notice 80-27, "Dogradat i on at Reactor
Coolant Pump Studs " Wo specific action or response
r e q.u i r o d
GRIER.B H Region 1, Philadelphia, Office of the Director
BO/Ot/11 Ip
BOQ7H00394 Forwards IE Info Notice BO-3B. "Prompt Reporting of into it
Accordance U/10CFH50 55te) " WD written response required
BRIER, B H Region 1. PhUadelph in, Office of the Director
BO/G6/13 1p
0007300594 Forwards IE Info Notice HO-3B, "Prompt Reporting of Info
Accordance W/1OCFRSO "JStal " No written response required
GftlER.D H Region 1. Ph i ladelph la. Office of the Director
BO/06/ 13 Ip
flOD70a050? Forwards IE Circular SO-15, "Loss of Reactor Coolant fattf
Coaling & Natural Circulation Cooldown " No written reipoTiBB
required
OR I EH, B H Region 1, Philadelphia. Office of the Director
BO/OS./EO Ip
HOO703O509 Fcriuards EE Circular 00-15. "Loss of Reactor Coolant Pump
Cooling *t Natural Circulation, Cooldoun " No written resp-oniB
requi rod
OBIEiR,D H Region 1, Philadelphia, Office of the Director
aO/OA/SO Ip
6007160704 Forwards IE Circular 130-14. "Rad ioacti v» Contamination of
Plant DeroineralJ led Hater Bus t. Resultant Internal
Contamination of Personnel " No written response required
QRIER,n H fiegjon 1. Philadelphia, Office of tho Director
80/06/S4 Ip
B-Q0716O704 Forwards IE Circular BO-14. "Radioactive Contamination of
Plant Oeminsral i n?d Hater SLJS d Resultant Internal
Contamination of Personnel " No written response required
CRIER, 9 H Region 1, Philadelphia* Office of the Director
80/06/2* Ip
B007210199 Forwards IE Info Notice QO-24, "Law Level fladuiast* Burial
Criteria " No written response required
GRIER.E H Region 1, Philadelphia. Office of the Director.
60/06/35 Jp
6007330123 Forwards IE Dull«tin HO-IA. "Potential Misapplication of
Rosemoimt Inc Models 1151 & 1153 Pressure Transmitters
U/Either A or D Output Cnites " Written response required
IE Circular BO-1 i also enc 1 No written response required
DRIER. B H Region 1, Philadelphia' Office of the Director
80/06/37 2pp
8007210199 Forwards IE Info Notice fJO-34, "Low Levol Radu»ita Bur 1*1
Criteria " No written response required
GRIEfi.B II Rflolon 1, Philadelphia. Office of the Director-
BO/06/3S Ip
6007330130 Forwards IE Bulletin BO-16. "Potential Ml sappl Icati an of
Raaemount Inc Models 1131 d 1132 pressure Transmitters
H/Elther A or D Output Codes " Written response required
IE Circular ao-lfi also enc 1 No written response reqitirid
GflIER,BH Region 1, Philadelphia, Office of the? Director
SO/06/27 3pp
6007310513 Responds to IE Bulletin BO- OB re containment lin»r
penetration usld e i a mi nations Penetrations will be
fabricated per Reg Quids 1 19 Butt uelds will b»
rad iograpried
PLABKDM.R E Long Island Lighting Co GO/07/01 3pp
B007310515 Responds to IE Bulletin 00-08 re containment liner
penetration meld eiaminatton.% P-ene tratj ons will be
Fabricated per Reg Guide 1 19 Butt melds will be
rad iographed
PLASKGN'R E Long Island Lighttnj Co 80/07/01 2p p
MCKET STN-90-517 JAMESPDB7 NUCLEAR STATION. UNIT H
A Application/construction stage document!; & correspondence
DOQ733QOO1 Formard* stateinent of policy re requirements to be met for
current OL appl icotion-Si as derived from NLJREG-O&60 k Pound
in WUHEO-CWgii
EISeNHUT.D fl Diviaion of LiCB-nsins 0-0/Ofi/3A 3pp
H Qeneral correspond ence
DOCKET STN-50~3ia MflRTSVILLE NUCLEAR PLANT, UNIT 1
Pi Appl icfltlon/cnnitruc tion stage documents b corre spondenc*
0007020230 Forwards NF1C Dfc of Nuclear Reactor Regulation BOO42B
reorganliati on chart Necessary period of transition made
ui/Aitn disruption to ongoing activities
TEDESCQ.lt L Assistant Director for Licensing SO/Oi/13 2pp
B007O1033D Forwards "Soc ioeconomic Monitoring E< Hitigatlon Rapt.11
Continuing info will be provided on semiannual basis
M1LL9,L M Tennessee Valley Authority BO/06/29 Ip.
— 8007010330 "Eocipeconofnic: Monitoring & Mitigation Repti " data «* at
790930
» Tannn-ssee VallBij Authority BO/OS/31 32pp.
BD071BOO43 Responds to BOO 133 llr re HRC approach to emergency planning
around nuclear plants Commission endoi-sed MUREO-039& for
dBvalopment flf state- f< local radiological plans Etact
conf iguration of Jones will be decided during plant review
CEN10M-H R Office of Nuclear Ruact-or- Regulation, Director
Epp
— BO071B0047 Requests that K1C am»nd proposed regulation re formulation
of evacuation plan to include all territory east of
Pacilitij Proposed 10-mile radius is unworkable for people of
Long Island Responsible plan ilinuld be developed
BEHAN.J L MHU) Yorfc, Htflte of 80/01/23 Ip
Q Inspection reports- IE Bulletins & correspondence
90Q7O1028C Forwards IE Info Notice 30-23, "Loss oF Suction to Enc-rgency.
Feedwater Pumps " No uirltten rosponsp required
QF1IER.B H Region lj Philadslphi a, Office OP the Director
80/05/39 Ip
B007OIOD&6 Responds to IE Bulletin BO-03, "Vacuunv Condition Resulting
in Damage to Chemical Vol Control Sijs (CVCBf Holdup Tanks "
Engineering sctivitiee have been curtailed Co point whs re
detail design data requested is unavailable
PLASKQN. R E Lang Island Lighting Co 80/06/05 Ip
8007210571 Foriuai-ns IE Info Notice BO-36, "Evaluation of Contractor
QA Programs " No written r«ponsn required
CRIER. D H Region U Philadelphia. BfFiCH of the Director
SO/06/ 10 Ip
HOQ71601Q1 ForuarHs IE Info Notlct HO-2/, "Degradatian of Realtor
Coola-nt Pump SStcids " No tpprific act* an or rvsponie
required
QRIER.D H Region I. Philadelphia. Office of the Director
Ip
BO 07 23 0001 Farwerde statement of policy re requlrementi to b< mat for
current OL app liiationsi as derived from NUREO-OfiiO & Found
in MJJ?EQ-Oi.94
EIBENMUT-D 0 Division of Licensing BO/Oo/36 2pp
0 Ad jud Lcatory correspondence
BOO'7310343 ForworcfB Commission 800337 memorandum & order containing
decisions on UC3 7S0302 petition for reconsideration of
790413 memorandum t< order UCB 771104 petition sought action
re fire protection for electrical cables
EIBENHUT, D 6 Division oF Licensing BQ/Ob/ZZ 89pj>
H Oeneral correap nniSente
H007110S7O Responds to enc 1 BOOS06 Itr addressed to President C»Pt«T
safety measures belnj taken to protect cltlient of TN
Facility is aubj to stringent const controls Radiation
eipoBuro will be kept to da loin as reasonably achievable
TEDESCD.fi L Assistant Director for Licensing BO/06/B6 Hpp
, Inspection reportsi IE DiJlletlns & correspondence
8007340029 Forwards IE Info Notice 00-20. "Loss of Decay Heat Removal
Capability at Davl s-Bcssc Unit 1 While in Refueling Mode "
Ho rusponse required
O'REILLV^J P Reflion 3, Atlanta. Office of the Director BO/OS/OB
3pp
8007140479 Forwards IE Bulletin BO-13. "CracUng in Core Spray
Spargers " No loritten response required
O'REILLY, J P Region 3, Atlanta. Office of the Director BO JOS/ IS
DOCKETED ITEMS
317
Fo-ruiariU IE Info Notice HO-23. "Loss of Buctinr. to Emergency
Fveduater Pumps " Mo urltten response required
O'REILLY.JP Kegion 2. Atlanta. Office of tHe Djrsttor BO/05/29
Forwards IE Infp Notice BO-36, "Evaluatkon af Contractor
QA Program* " No written response required
O'RCILLYiJP Region 2, Atlanta, Office at the Qnectnr ao/Ob/10
3PP
B007140301 ForuanlB IE Bulletin HO-iA. "DearaiJat ion D f HWR Scram
Discharge Vol Capability " No written response required
D'REELLY.J P Region 2, Atlanta. Office of the D-tractor BO/OL./12
— 8007240329 IE Insp Rcpts 50-518/00-09,90-119/80-00,50-930/00-08 t,
SO-321/BO-CB Qn BQO331-0425 None omy 1 iflnc e noted reactor
pressure vessel stored In dusty area
CQNTRELL, F S Region S. AtSanta. Reactor Construction !.
Engineering Sup pur I fl ranch SWAN, W 3 Region 3, Atlanta, OF PICE
of the Director ao/05yaa dpo
8 Fleportflb le DC turrnni es. LEHs It related correspondence
fl00717O23i- Part SI rept re potential defect In air conditioning units
in facilities Detailed info ui 11 be provided to assist
determination t>t significant *afet*j iiaiard
QIFttlLJx.E -I Carrier Corp Carrier Air Conditioning Div GO/Q6/17
3pp
aQ07Sa03S4 Forwards IE Info Notice SO-3B, "Prompt Reporting af info in
Accordance U/1QCFR50 35<e>," No written response required
Q'flEILUY.J P Region S, Atlanta, Office of th e Director SO/06/13
3pp.
BOQ70aO49° Fo-ruiards response to IE Bulletin HO-0? transmitted b(J
JP O'HtUly 800417 Itr Final ropt far Hartsville & Phlnpfi
Bind plants will be sent on or before (3O1017
MILLS, L H Tennessee Valley Authority BQ/Oi/tft Sp p
8QO633O275 Foruard! final deficiency repl rp incorrect root face on
shewed cadueld sleeve;
MILLS, L M TenneSBBB Valley AuthiiTittj BO/Oi/11? lp
8OO717O2-17 Part SI reft of potential 1 ij defective RosBmount, Inc
transmitter in tontrol sys of air conditioning units InFo Is
provided to assist In determination nf significance as
safetg haiard
OIRDUX.E -J Carrier Corp Carrier Air Conditioning Div BO/Oft/aO
a0073QOSa9 Foruiards IE Insp Hepts BQ-31B/QO-IQ, 90-S1 9/BG-10,
SO-32G/BO-10 fc 5O~5ai/BO-IO on BQ042S-Q330 No noticompl ianc e
not«d
MWPHY, C E Region E. Atlanta. Reactor Construction & Engineering
Blip-port Branch 00/06/17 app
B0071 1O32O FoTUQrils First iritt'iim deficiency rppt nn Roaemount; Model
H52 pressure tTansmitter diuftcts imtiallg reported 8DO&03
Final rept uill be aubmittuil on or before B00917
MILLS, L M Tennessee Valley Authority 50/07/03 lp
— BO073OOS94 IE In«P fiepti 30-51B/BO-1O, 5O-319/00- 10, SO-320/fiO-iO &
30-521 /BO- 10 on BQ042B-OS3Q No noncompl i anc e noted Major
•r«*» inspected earth corapac ti on, structural concrete t<
previous Intp -findings
CANTRELL.F.8 Region 2> AtSanta, Reactor ConEtr-ucti on d
Engineering Support Branch SWAN, W D Region 2. Atlanta. Office
of thl Director BQ/Ofc/17 fapp
Bf»7Oao391 Foruiapdi IE Circular BO-IS, "Loss of Reactor Conlant Pump
Cooling S< Natural Circulation Cooldoun " No written response
TBitu trad
O'REILLV.d P Reoion Si Atlanta. Offico of tKe Director BO/06/2O
lp.
BOO717O070 Foruar-ds IE Cir-ular 00-11. "Had i oac tl vo Contdnina t ipn of
Plant D»»ineral i led Wati?r Sys d Resultant Internal
Contamination of Personnel " No urittirn response requir*d
O'REILLYjJ P. Rggio-n S, Atlanta. Office of the Director BO/OA/24
tp.
BO07E30SS3 Foruafdt IE Dutlvtln GO- lib, "Potential Misapplication of
Rn»ijnoLint Inc Models 1131 k 1152 Pressure Transmitters
H/Either A or D Output Co-ties " Written response required
IE Circular BO- 16 also end No written response reqirirod
O'ReiLLV.J P RES inn 3, Atlanta, Office of Vho Director SQ/06/27
lp.
BO07320236 Reipondl to IE Bulletin 79-aa, "PaiKiblo Hal f unc H on of
HAHCD Model EAIBO Limit Quitches nt Elevated Temps "
Invictlgatloni o-hoiu no NAMCO ErtlBO stuitcheE are installed or
planned for ln«tal la t ion.
MILLS, L M TetineBsae Valley Authority HO/O7/01 lp
eOO7aBO6ia Responds to IE Bulletin HO-OB, "Eiamlnation of Containment
P ill *t ration Heldt " Results of 1 nves ti gation one 1
MILLS, L H T tunes SBC Va II eg Author I tij BO/07/Q7 So p
90O7S40a65 Ack receipt of DO 0634 Itr informing NRC af itepn tateli to
correct violation* noted in IE Jnap Depto 5O-51B/BO-QB.
SO-919/BO-Oa, 30-320/00-00 t< SO-B21/OO-OH
HURPHYiC.E Region 2. Atlanta. Reactor Construe t ion t Engineering
Support Branch 80/07/03 lp
-- 8007240279 Responds to NttC (300930 Itr ra violations noted In IE ln*p
«»pt» 30~BlB/BO-Oa. 50-519/HO-O0. SO-SaO/aO-OS (, 30-321/BO-OB
•Carrtctivo aetii>nfi temp (, humidity moniloi-ing pquipment
annite b ready For Installation on next vesHffl
HILL6, L M TenniesoB ^allay Authoi-ity GO/OA/SI 4pp
— aa071JO3HB First interim lief 1 c loncij rept on (iosBmount Wodel 1152
pressure trad emitter lioPectB During tuiting,G£ Found
ambiguous output to over d under pressure conditions Revieu
to determine number o* tranemitters on location underway
-• Tennessee Valley Authority BO/07/02 lp
B007140349 Forwards Bflcond interim ilefinentij rept re cracls in roactor
pressure vessel shl«ld mall Final rep b to he aubmilted
before 801003 Ui U provide attl info re repair of shield
uiell ti coi'rectlvp actions
MILL8. L M Tennessee ValUq Authority BO/07/03 lp
— 00071'10353 Second intErim deficiency rent re era tits in reactor prcsmr
vessel shioSd ua] 1 Discovorod base metal cracks in shield
uall inner shell plates Evaluation revealed crack Initiated
at tae of tact me 1 A beat) at backing strip
* Tennessee Valleu Authority 00/07/03 2pp
3007330338 Final deficiency rept re omitted heatora from Reliance
Electric Co motor operator nefirient motor will tie replaced
by B0113O GE uill rfvieUJ vendor OA program to assure proper
Imjilementatton
MILLS, L M Tenneis&e Valley Authority HO/07/19 3pp
B007290734 Final Deficiency R«pt 1 re definont uplda found on anchor
bolt chair d containment shell & base plato Caused by QA/QC
inspectors nob allowing u^lds to pass m*p Ttnh Force !<
retraining ft Ticcer tl f icatlon program initiated
* Tennessee Valley Authnrjty S0/tl7/2fl 3pp
DOCKET -STN-50-51? HfiRTSVlLLE NUCLEAR PLANT, UNIT 3
A Ap/pl i cat! on/c onstvuct i on stage docunvents ti correspondence
B007020252 Foriuards NHC Ofc of NucleaT Reactor neoulatian 800439
reorgani latiott chart NeceBiary period of transition made
ui/min disruption to ongoina artlviiiPs
Te»EBCO.» L Assistant Director For Lltensina HO/Oij/13 2pp
BOO701O338 Forwards "Sot i oeconomic Monitoring A Mitigatian Rept "
Continui-na inPo uii 1 1 5je provided tin lemiannual bosiE
MILLS, U H Tennessee Vallei) Authnritij BO/06/P11 lp
— ao07O!O330 "Socioeconumit. MonJtoring (, Mitigation ilnpt, " data as of
79O930
» TennessBB V.illey Authority BO/05/31 53pp
-8007840273 Forwards IE Insp ReptB 50-518/BO-OB, SO-319/00-09,
so-aao/ao-OB & ao-aai/Bo-oa on Boo-aai-o-isa «* notice of
Violation
MURPHYiC.E Region E- Atlanta, Reactor Conotfuc tlon t< Enginaoring
Support Branch BO/05/30 3pp
B007B30001 FoTu&rds ntatement of policy re rDnutrfiments to bs met fop
eurre'nt OL appUcntlotiBhas derived From NUREO--0660 & found
in HUREG-Oiffl
EISENHUT.D O Division of Licensing BO/Ci/36 Spp
— 8007340309 Notice of violation from insp on 600331-0435
• Rftf)l»n 2, Atlanta, DffUc of the Director SO/O5/30
318
DOCKETED ITEMS
0 Adjudicatoi-y.ciirrpspimaence
QOD7310243 Foruards Commi salon B1JO527 memorandum & ordep containing
decisions on UCE 7BO5O2 petition for rec ons i derst I on of
780413 memorandum !, order UCS 771104 petition sou-glit action
re fire protection for electrical cables
EISENHUT.D G Division of Licensing BO/OA/25 S^pp
H General t arresp Dndenc e
9007110970 Responds to end SQD50& 1 tr addressed" to President Carter re
safety measures being taken to protect citiiens of TN
Facility Is subj to BtTingont const controls Radiation
aiposure mill be kept to as law as reasonably achievable
TEDESCO.R L Assistant Director for Licensing 80/06/36 2pp
a Inspection reports, IE Bulletin's t correspondence
BOD734OOB9 Forward! IE Info Nntite BO-ao. "Loss of Decay Heat Removal
Capability at Davls-Besse Unit I While in Refueling Mode "
Ho response required
O'REILLV.J P Ruglon 2. Atlanta. Office of the Director BO/05/03
3PP
B007I40479 Forwards IE Bulletin 80-13, "Cracking in Core Bpray
Spargers " Ha written re-spouse required
O'REILLY.J P Region 3. Atlanta. Dffico of the Director HO/05/12
bp
UOQ7010?35 Forwards IE Info Notice 80-33, "Loss of Suction to Emergency
Feed water P-umps " Ho written response required
D'REItLV.J P Region 2. Atlanta. Office of the Director BO/05/2?
BOQ7320039 Forwards IE Info Notice BO-26. "Evaluation of Contractor
QA Programs " No written response required
O'REILLY.J P Region 2, Atlanta. Office of the Director SO/O6/1O
0007230236 Responds to IE Bulletin f>-2B, "Possible Malfunction of
NAM CD Model EA1BO Limit Quitches at Elevated Temps "
Investigations show no NAMCO EA1BO switches are installed of.
planned for Installation
HILLS, LM Tennessee Valley Authority BO/07/01 lp
BQO7SB0613 Responds tn IE Bulletin BO-OB, "Elimination Of Contftinntnt
Penetration Welds " Results of investigation end
MILLS, L M Tennessee Valley Authority BO/07/07 3pp
0007240265 At* receipt of 8O0624 Itr informing NRC of steps taken to
correct violations noted in IE Insp Flepts 30-51S/60-OB.
30-319/BO-OB, 90-330/BO-OB L 50-331 /BO-OB
MURPHY. C E Region 3. Atlanta, Reactor Construction b Engln»rlri|
Support Branch BO/07/08 lp
— BOO724O279 Responds to NRC BO0330 Itr re violations nottd In IE In*>
Ftepto 50-51B/BO-oa, 30-319/BO-OB, SO-330/80-Ofl & SO-SHl/BO-OH
Corrective actions temp & humidity monitoring equipment
onsltc & ready for installation on next vessel
MILLS, L M Tennessee Valley Authority BO/O6/24 4pp
— B007240293 Forwards IE Inftp Repts 3O-3IB/BO-QB. 30-319/HQ-OB,
50-320/aO-Qa fc SO-521 /BO-OS on 300331-0425 b notice of
violation
MURPHY, C E Raglan S, Atlanta,, Reactor Construction li Englntfr(Tl|<
Support Branch BO/O5/30 2pp
— -BOO724030S Notice of violation from insp on B00331-04S3
• Region 2, Atlanta. Office of the Director 80/05/30 lp
— BOQ7240327 IE Insp Repts 50-31B/BQ-OB. SO-919/BO-OB, 5Q-3SO/GO-OB t
HO-521 /BO-OB on BOO331-O423 Noncomol lance noted reactor
pressure vessel stored in dusty area
CONTBELL.F E Region Hi Atlanta, Reactor Construction It
Engineering Support Branch BWAN. H B Region S, Atlanta* Offlcl
o* the [Hreclor BO/05/30 (bpp
S Reportable occurrence*, LCRs tt related correspondence
B007I40301 Forwards IE Bulletin 80-14. "Oesradat ion of BUR Scram
Discharge V-ol Capability " No written response required
O'REILt-Y, J P Region 2. Atlanta. Office of the Director QO/Qfi/12
IP
B 007 170236 Part 21 rept re potential defect In air conditioning unlti
in facilities Detailed info uill he provided to assist
determination of significant safety hazard
J Carrier Corp Carrier Air Conditioning Div BO/06/17
B007250334 Forwards IE Info Notice BO-SB. "Prompt Reporting of Info In
Accordance H/IOCFR50 55<e) " No written response required
O'REILLY, JP Region 2, Atlanta. Office of the Director 80/06/13
3pp
BQ 07020 4 9 9 Forwards response to IE Bulletin 80-09 transmitted hi]
JP Q'Reillij 800417 Itr Final rept For Hartsvllle t< Phipps
Bund plants will be oert on or before B01017
MILLS,!- H Tennessee Vfllleu Authority BO/06/lfi Spp
B0073005B9 FoTwarda IE Insp Repts 50-510/flO-IO, 50-319/^0-10,
30- 520/-BO-10 (< 50-5ai/BO-10 nn 800fl?a-053O No noncomp 1 ianc»
no turf
MURPHY, C E Region 3. Atlanta. Reactor Construction fc Engineer-inn
Support Branch 80/06/17 Epft
— B0073O0394 ]E Insp Hepts 3O-S1H/HO-1O. 50-919/80-10, SO-SHO/flO-lO t,
SO-Sai/BO-IO on B0042a-Q530 No none orap 1 lance noted Major
areas inspected earth compact inn. strut tural concrete fc
previous ins>a findings
CANTHELL.F S Region 2. Atlanta. Reactor Construction t
Engineering Swppitrt Branch SHAN, U D fleglan 2, Atlanta. Office
dif tha Director BO/O6/17 6pp
B0070SO391 FoTuards IE Circular HO-35, "Lo*» of Hcactor Coolant Pump
Coolirig & Natural Circulation Cooldnun " Ho urltten TDBpons»
required
O'REILLY, JP Region 3, Atlanta. Office of the Director 80/06/20.
B007170S47 Part SI rapt of potentially defective Ron mounti Inc
transmitter in control sgs of air conditioning units. Info it
provided to assist in determination of significance as
safety hajard
BIRDUX.E J Carrier Corp Carrier Air Conditioning Div 60/06/30
B0071103ao Forwards first interim deficiency mpt on Ronmount Haiti
1192 pressure transmitter defects initially reportad 800603
Final rept ulll be submittBd on or before B00917
HILLS, L M Tennessee Valley Authority BO/07/02 lp
— B007MQ32B First interim deficiency rept on Rosemount Hodet 1192
pressure transmitter defects During testing, OE found
ambiguous output to aver ti underpressure condition! Review
to determine number of transmitters on location underbuy
* Tennessee Valley Authority BO/O7/Q2 lp
8007390734 Final Deficiency Kept 4 re deficient ueltti found on anchor
bolt chair & containment shell fc base plate Caused by OA/OC
Inspectors not allowing welds to pass Insp Task force b
retraining b recertif Icatlon program initiated
* Tennessee Valley Authority BO/07/34 3pp
DOCKET BTN-SO-320 HARTBVfLLE NUCLEAR PLANT. UNIT 3
A Application/construe tian stage documents & torreBpondtnce
B€a717OD7O Foi-uards IE Circular 80-14, "Rndioactivu Contamination of
Plant Deminerali i Ed Hater 'lys & Resultant Internal
Contamination nf PirrKonnel " No written response required
O'REILLY, JP Region 3* Atlanta. Office of the Director BO/O6/Sfl.
3007020252 Foruards NRC Ofc of Nuclear Reactor Regulation 800429
rearganl tatian chart Necessary period of transition made
u/nln disruption to ongoing activities
TEDESCO.R L Assistant Director for Licensing 80/06/13 Spp
8007330253 Formarils IE BulK-tin BO-lfi, "Potential Mi sapp 1 icat 1 pn of
Hos«irai>unl Inc. Moilpls 1191 tt 1 1 53 Pressure Transnt tters
M/Either A or D Output Cod^G " Written response required
IE Circular BO-16 Jlso unc I No written response required
O'HEILLV,J P Region H- Atlanta, Office of the Director 90/06/37.
IP
B007O1033B Forwards "Soei oec onoml c Monitoring & Mitigation R*pt "
Continuing info uiill be provided on semiannual basis
M1LLS.L H, Tennessee Valley Authority BO/06/23 lp
— BOO701O390 "Boc loeronomic Monitoring ti Mitigation Rupl. " dat* ai of
790930
* Tennessee Valley Authority BO/O3/31, 32pp
319
8O0723QOdt Forward i statement of policy re requirements to be met fni
currant OL applications, at derived from NUREO-OiiiiO (. Pound
In NURlEQ-0694
EISEWHUT, D 0 Division Of Licensing BO/Q6/2& 2pp
0 Aajud i
correspondence
BOQ731O243 Forwards Commission BQ0527 memorandum ft order containing
diciilnna on UCS 7BO302 petition for reconsideration of
790413 memorandum It order UCS 7711O4 petition sought action
TB fir« protection for electrical cables
EISENHUT-D 0 Division of Licensing BO/Oi/25 B9pp
H Oonirol correspondence
BOO71 1O37O Responds to end 800906 Itr addretaed to President Carter re
safety Measures being taken to protect citliens of TN
Facility ii tubj to stringent const controls Radiation
• ipniUre will be kept to as lou 01 reasonably achievable
TEDESCO. R L Asmlstant Director for Licencing HO/Oi/36 2pp
Q Inipoction reports, IE Bulletins t, correspondence
BOO7B40O39 Forward* IE Info Notice 80-20. "Loss of Decay Heat Removal
Capabilltu at Davls-Besse Unit 1 While in Refueling Mods "
Ho r»»pon«* required
O'REILLY, J P tteglon 2, Atlanta, Office of the Director 80/05/OB
3ft
D00714O479 Forwards IE Bulletin 80-13. "Cracking in Cnre Spray
BaargBT* " No written response required
O'REILLY.J P Region 2. Atlanta, Office of the Director BO/03/13
BQ07230253 Forwards IE Bulletin 80-16- "Potential Ml sap pi i cat i c-n of
Rosomount Itir Model? 1191 l< 1152 Pressure Transmit tars
W/Elthcr ft or D Output Codes " Written response required
IE Circular BO-li als-o cncl No written response required
CTREILLY,J P Region 3, Atlanta. Office of the Director BO/Ofc/27
IP
0007230236 Responds to IE Bulletin 79-SB, "Possible Malfunction of
NAHCD Model EA1BO Limit Buiitilies at Elevated Tempc "
Investigetions shou no NAMCO EA1BO switchee are Installed DT
planned For installation
MILLS. L M Tcntiessea Vflllpy Authority BO/O7/O1 ID
0007390615 Hesponds to IE Bulletin BO- OS, "Eiaininat ion of Containment
Penetration Welds " Rueults of investigation one]
MILLS. L H Tennessee Valley Authority HO/07/O7 Spp
0007240365 rtch receipt of BOO A 21 Itr informing H»C of steps tat an to
correct violations noted in IE Insp Rept5 50-3lB/GO-Oe,
SO-319/9C-OO, 5O-320/BO-OB Si 50-531X110-09
MURPHY, C E Region 2, Atlanta, Reactor Construction t. Engineering
Support Branch QO/O7/08 Ip
— B00724OS79 Responds to NiJC 8OO530 Itr re violations noted in IE Insp
Repts 50-51B/BO-oa, 50-51^/BD-oa, 5O-5aO/BO-Oa !, 50-521/BO-OB
Corrective actions temp t, humidity monitoring equipment
unsito It rpddi) for installation en nmt vessel
MILLS. LH Tonnessae Valley Authority BQ/O6/24 4pp
— BO0724O293 ForuiardB IE Insp Hepts 5O-51C/BO-CB, 50-519/BO-oa.
50-330/00-00 J< 30~92l/HO-aa on BOO33i-Ofl23 H notice op
violation
MURPHY. C E Region 3, Atlanta, Reactor Construction & Engineering
Support Branch BO/OS/SO 2p p
0007010323 Forwards IE Info Notice 80-23, "Loss of Suction to Emeroency
FoBriwator Pumps " No written response required
O'REILLViJ P Region 2, Atlanta, Office of the Director 60/03/29
Ip.
B007220059 Forward* IE Info Notice 80-26. "Evaluation of Contractor
QA Prograns " No written response required
O'REILLY- J P Region S, Atlanta. Office of the Director. BO/06/lQ
3
--BOO7240305 Notice of violation from insf on 800331-0425
» Region 2, Atlanta, Dfficu a? the Director BO/05/30 Ip
— B00734Q329 ]C Insp Ropes SO-5ia/BO-OB, 50-5W/BO-OB, 50-520/aO-Ofl b
50-521/BQ-09 pn BOO331-0425 None omp 1 lance nntcd reactor
pressure vessel stored in dusty area
CONTRELL.F s Region 2. Atlanta, Reactor Construction !•
Engineering Support Branch SWAN, U D Region 2. Atlanta, Office
of the Director BO/O9/3O ttpp
O007MOM1 Forwards IE Bulletin 80-14. "Degradation of EUR Scram
Discharge Vol Capability " No written response required
O'REILLV. J,P, Heglon 2, Atlanta, Office of the Director 80/06/12
IB.
BOO 7350384 Forwards IE Info Notice BO-3B, "Prompt Reporting of Info in
Accordance U/10CFR30 354e) " No urltten response required
D'BEILLV.J P Rtglon 2. Atlanta. Office op the DireetoT 80/06/13
3pp.
B007O3O4?? Faruards responio to IE Bulletin 80-O7 transmitted by
JP O'Rallly B00417 Itr Final rept for Hartavilla & Phippi
Bend |>lant» utll be sent an or before 801017
MILLS. L ft Tennessee Valley Authority HO/06/16 2pp
8007300009 Forwards IE Insp Repts 3Q-51B/BO-10, SO-319/BO-10,
50-320/00-10 * 90-921/80-10 on 800428-0330 No noncomp 1 lance
nctod.
MURPHY, C. E Region 2. Atlanta. Reactor Construction It Engineering
Bun port Branch QO/06/17 Spp
— BOO73QO994 IE ln»p Reptt 90-51B/BO-10. 30-31 9/80-10, 50-320/80-10 I.
SO-921/BO-10 on 800436-0330 No noncompl ianca noterf Major
artJim inspected earth compaction, structural concrete &
previous Insp findings
CANTRELLiF B Region S, Atlanta. Reactor Construction &
Engineering Support Branch BHAN. W D Region 2, Atlanta. Office
at the Director 80/06/17 4pp
BOO 702039 J Forwards IE Circular BO-19, ,|"Loss of Reactor Coolant Pump
CoollTsg b Natural Circulation Cooldown " No written rBsponse
riqulrvd
O'REILLV, J P. Region B. Atlanta, Office of the Director BO/06/ao
IP-
BOO7170O7O Foru»rdi IE Circular BO-14. "Radioactive Contamination at
Plant Demineral t tad Mater Egs t< Resultant Internal
Contamination of Personnel " No written response requireil
O'REILLY. J P Region 3, Atlanta, Office of the Director BO/06/S4
Ip.
B Reportaii 1 E oc currences, LERs (< related correspondence
B007170H36 Part 21 rept i-e potential defect In air conditioning units
In facilities Detailed in Fa mill be- provided to assist
det-erminat) on of significant safety haiard
OIRDUX.E J Carrier Corp Carrier Air Conditioning Dlv BO/O6/17
3PP-
8007170247 Part 21 rept of potentially defective RusBmount, Inc
transmitter in control ays of air cund itloning units Info Is
provided to assist in determination of significance as
safety haiard
giROUX.E J Carrier Corp Tarrmi- Air Conditioning Div BO/06/20
0007110320 Forwards First intonm deficiency rept on RosEWount Model
1152 pressure transmitter defects mitlallij reported B00i03
Final rept uill he submitted on or before B00917
HILLS, L M Tenneasee Valley Authority BO/07/02 Ip
— BOO7110-33B Tirst interim flcflciencg rept on RoBeraount Model 1132
pressure tranamitter deFects During testingiQE found
ambiguous nutput to over It under pros cure conditions Review
to determine number oF transmitters on location underlay
* Tennessee Valley flmthorltij £10/07/03 Ip
DOCKET STN-3O-9E1 Hrt(tT3yiLUE NUCLEAR PLANT. Wit 1
A Application/tonstruct ion stage documents d correspondence
Q007 020352 Foruiards NRC Ofc of Nuclear Kenctor Rcoulabion B0042S
reorganiiation chart Necessary period of transition made
u/tnin disruptlun to ongoing activities
TEDESCOpR L Assistant Oiructoi- for Licensing 80/06/13 2fl p
BOO701033B Forwards "Sue 1 oec onomi c. Monitoring (< Mitigation Rapt "
Continuing inFo dill I be provided on semiannual basis
MILLS, L M Tennessee Valley Authority 00/06/35 Ip
— B0070103SO "Socioeconomlc Monitoring t. Milisatian Rept. " ilatfl as of
790930
* Tennessee Valley Authority HO/05/31 S2pp
320
BQ0723OOO1 Forward? stat-emon* of policy re requ i rera«n ts to be met fnr
current DL ap p 1 1 cat ionD , ds derive" Prom NUflEG-OfiiO h Found
in NUH£Q-OA9fl
EISENHU'TiD 0 Division of Licensing SQ/Qb/Zla 2p p
5 Ad juij i calory carre ipuiiitpnce
3007310343 Forwards Commission BOOS27 manuirandujn fc order containing
decisions on LJCS 7E10503 petition for ret on&iderati on of
760413 memorandum It order UCS 771104 petition sought action
re Fire protection for electrnal table*
EISENHUT. D 0 Division of Licensing BO/Oi/25 09pn
H General correspondence
BOO7110370 desponds to encl 900506 Itr addressed to Prtsident Carter re
safety file-as urea being tat en to protect titiions of TN
Facility is subj to stringent canst controls fl-nd lat i an
exposure mill be kept to fl£ low as reasonably achievable
7EDESCD. R L ftsEiat.int Diroctor for Licensing BO/Qi/Bi, 2pp
(1 Inspection reports. IE nulletins i correspondence
Forwards IE Info Motico BO-2O, "Loas oP Decay Heat [1 em oval
Capability at Davl -s-IIe sse Unit 1 While in Refueling Haifa "
Ho response required
OJREILLY. J P Region 3. Atlanta, Office of the Director 80/03/OB
3po
B007140477 Forwards IE Bulletin BO-13, "Crocking in Core Bpray
Spargers " No written response roquired
O'FIEILLV. J P liejion 2, Atlanta, Office of the Director SfVOS/12
3007330253 Forwards IE Dullotin BO-lfe- "Potential Mi Happl ication of
Hosemount lnc Models 113-1 b 1152 Pressure Traninittera
W/Either A ur D Output Codes " Written response required
IE CiTcular BO-16 also encl No uritten responie r>D.ulrei)
O'REILLV.J P Region S, Atlanta, Officn of the Director BO/Oi/S7
lp
H00722023i Responds to IE DulUtln 77-20, "Possible Malfunction of
NAMCO Model EA1BO Limit Suiitchoa at Elevated Temps "
Investigations shoui no NAMCO EA 1 BO suitches are installtd or
plnnncil for installation
MILLS.L M TennesseP Valley Authority BO/07/01 lp
BOO72BO&15 Responds to IE Bulletin SO -OS, "Elimination of Contalnniut
Panetration Uelds " Results of Investigation encl
MILLS.L M Tnnn*SHO(> Valleij Authority QO/07/07 5pp
0007340265 Ac* receipt of BO0624 3tr InCorming MRC of «t«pi tabvn *»
correct violations noted In IE 3n«p Repts 50-513/00-00-
50-919/aO-OH, 5O-920/HO-BO & 90-5at/BO~OB
MURPMV.C E Region S, Atlanta, JTaactor Construction & Enntnevrlng
Support Branch BO/O7/OB lp
— B0072<10H79 RsspondK to NRC 00053O Itr re violation* noted In IE 3rip
Ilepts 50-51 B/BO~Da. 50-S19/BO-OB, SO-S20/SO-08 & SO-321/BO-OB
Correitive actions temp t humidity monitoring eq.l'ipn»nt
onittp t< readg for installation on neit vesiel
HILLS. L H Tenne-sBee Valley Authority BO/06/24 4pp
— Q007240393 Foruards IE Insp Rep** 50-51B/BO-OB. 50-SI9/BO-OB,
80-32O/BO-OB I. BO-321/aO-OB on 000331-0435 fc notice Df
violation
MUHPHYj C E Region Z< Atlanta. Reactor Construction tt Enfltntarlng
Support Branch 00/03/30 2pp
8007010335 Forwards IE In To Notice BQ-23. "Lois of Suction to Emergency
Feeduater Pumps " No written response required
O'REILLy.J P Region a. Atlanta, Office of the Director 80/03/27
B007S30O2V Forwards IE Info Notice BQ-36, "Evaluation of Contractor
QA Programs " No ivritt-en response required
0'UEILLY. J P Region S, Atlanta. Office of the Director BO/OA/1O
3pp
0007H0301 Fcruards IE Bulletin HO-14. "Degradation of DWB Bcram
Discharge Vol Capaliility " No written re&pontB required
n'DEILLV.J P FlBflion a, fttlanta. Office at the Director BO/O6/13
IP
8007250384 Forwards 1C Info Notice 80-Sa, "Prompt DEjiDrtinfl of Info In
Accordance U/10CFRSO 55(e) " No written response requireel
O'ftEILLV.J P Region 3. Atlanta, Office oF the Director BO/Oi/13
3pp
QO07020499 Forwards response tn IE Bulletin BO-09 transml tt stf bg
JP n'Reillg 800417 Itr Final rept for Hartaville !. Phipps
Oend plants ulll be sunt on or before BO10I7
MILUS.L M Tennessen Valley Authnrlti) OO/06/li 2pp
B007300SB? Foruiarils IE Insp Ropts SO-31 B/BO-10, SO-31<?/BO-»0,
30-520/BO-10 l< 50-321/PO-10 on 000123-0530 No noncomp 1 iance
TlOtBd
MURPHV.C E Rpglnn Z, Atlanta, Reactor Construction b Engineering
Support Branch BQ/Q6/I7 2pp
--DO 0-730039^1 IE Insp [i&pti 50-5 IB/BO-10, SO-S19/80-IO, 5G-520/BO-1O t,
30-5S1/BO-1O on 300428-0330 No none amp J i ance noted Major
areas inspected earth c onpat 1 1 on. struc tural concrete ti
previous tnsp findings
CANTnetLi F S Region S, Atlanta, Reactor Construct i on &
Engineering Support Branch BQ/Qiy 1 7 &pp
B007020391 Forwards IE Circular SO-13, "Loss t*F Reactor Cqnlart Pump
Cooling & Natural Circulation Cooliloun " No urltten ruspont*
requl red
O'RGILCV.J P Region 3, Atlanta. Office of the Director BO/OA/30
30O717007O Foruards IE Circular BO-It, "Rarfioac t Ivo Contamination of
Plaivt Demineralt iert Wnter Bgi t, Resultant Internal
Contamination of Personnel " No written response required
O'REILLVjJ P Region 8. Atlanta. Office Of the Director BO/06/H4
— B00724O30S Notice of violation from insp on B00331-0423,
* Rogion B, Atlanta. Office of the Director BO/05/30, lp
— 300724033"? IE Insp Repts SO-SlB/BO-Oa, 30-S19/BO-OB, 30-5BO/BO-08 b
50- 531 /BO-OB on 000331-0429 None oflipl ianee noted reactor
pressure vessel stored in dusty area
CANTRELL.F S Region 2, Atlanta, Roactor Construction b
Engineering Support Branch BO/OB/30 &pp
B Reptirtable occurrences, LERs & related correspond tie «
BOO717O23ii Part 21 rept re potential defect in air conditioning tmlti
in Facilitios Detailed Info uill be provided to asiiit
determination of significant safety hazard
OIHDUX.E J Carrier Corp Carrier Air CondltlnninH Div 90/OA/J7
80O717O247 Part SI rept of potentially defective Roiemount, lnc
transmitter in control sijs of air conditioning unit* Info It
provided to assist in datermina tlon of significancB a*
safety hatard
OIROUX'E J Carrier Corp Carrier Air Conditioning Dlv 80/06/20,
29pp
HOO711O320' Forwards first Interim deficiency rapt on Ro«««iount Mod«l
11S3 pre&sure transmitter defects initially reported 600603,
Final rept uill be submitted on or before B00917
MILLS.L M TBunessee Valley Authority 80/07/02 lp
— DOO711O33B First interim deficiency rept on R Dismount Modtl 11S2
pressure tronsmi tt*r defects During testing, 8E found
ambiguous output to over & und erpressuro conditions Rtviiw
to determine number of transmitters on location underway
* Tennessee- Valley Authority BD/O7/03 lp
DOCKET BTN-30-322 HKAQIT NUCLEAR PQWEfl PROJECT. UNIT 1
A App 1 Iia tioti/construt tlon stage documents & correspondence
HD0703O30S Comments on proposed rule* 10CFR30 6 51 u/Buinoml»h TriHl
Community endorses position for Ful'l eonelderation of Class
7 accidents Urges consideration of Class 9 accident in
Skagit proceedings W/Certi f icate of Bvc
OENDLEDiH W Skag 1 ton ians Concerned About Nuclear Pouer MEANS, D, 8
Affiliation Unknown BO/06/17 4pp
BCO723O001 Toruards Etatement of policy re requirements to b* net tor
current OL app 1 1 cat tnns, ai derived from NUREO-OS60 & found
in NUKEO-Oo^l
EISEWUT. D O Division of Licensing BO/06/at 2pp
321
8007190737 Inform NRC that four private utils have formed uh al Kj-ounad
ttljin»»T-inj ft const company to perform engineering. 1 icenslno.
fc conn* CVE* POT ma JOT generating projects Company ulll be
activated on S007IS Press release ent 1
FEH*USON,H J Affiliation Unknown BQ/07/OB 4pp
G007150737 Informs NRC that four private utiis have Formed luho 1 ly-owneri
engineering 6 con-st company to perform eng ineet-itig. lit esiging
tt const svcs For major generating projncts Company will be
activated on B00715 Press release e-ncl
FERGUSON, W J Affiliation Unknouin BQ/Q7/OB 4pp
0. Adjudicator
Q Adjud icatnry corrnsp-ondenti
QO07010397 Forward* ABLB 000306 memorandum summarillng hearing statu* tc
FT Thoensn 000414 Itr to A8LB Indicating sit* change
eoillhillty H/o entl
BWAH80N. BT Hiaritu Branch 1 BO/O4/li Ip
80Q701O2S7 Forwards ftELH BOQSOfi memorandum iummari i ing hearing status
FT Thomson EC 04 14 Itr to ASLB indicating site change
possibility UVo end
SUANSOM.& T Hearing Brand. ] BO/01/16 Ip
9007310343 Forwards Commiition B00527 memorandum fc or*«r containing
decisions on UCB 7SO302 petition far reconsideration of
7BQ413 aeaoranitu* & order UCB 771104 petition sought action
rt Fire protection for electrical cab 1 BE
EIEEHHUT. D e DivUion at Licensing BO/Oi/aB S9pp
aO£>731OH43 Forwards Commission EOO537 memorandum !. order containing
decisions on UCS 7905-02 petition fur ret onsidarat i on of
7BQ4I3 memorandum & order UCS 771104 petition sought action
re fire protection Cor electrical cables
EISENHUTj D 0 Division of Licensing BO/Oi/25 B9pp
BOD7IOO171 BuliBitt third itatu» rnpt concei-nina progress made in
rtiolvlng U30S/NHC BO0306 repeats for addl info re geolagtj/
niiaoltnu vf plant kit* Ritiucsts For aridl info remain
unchanged due to incompleti rspt
THOHSEN, F T. Perkins. Coie. atone, Qlsen & Wi 1 1 tarns BO/O6/E7
3pp.
SOO7100171 Submits third status refit concerning progress made In
resolving USGB/NRC 300306 reQiiEstE for addl Info re geology/
i e 1 smo 1 tig ij at plant site fieo.up5ts for addl Info remain
unchanged due to incomplete rep t
THOMfiEN.F T Perkins, COID, Stono, Olsen & Williams BO/OJ./27
B0070103M Advl.n ot no d*velapm>nt re NRC or USOS revi«u of
application. NRC !• unable to predict date for rescheduling
hearing*
BLACK, R.L, Hearing Branch 1 BO/O6/2O. Ip
eOQ701O33{} Advisas of no development re NRC or USGS rpvisu of
application HRC IB unable to predict date for rescheduling
hearings
DLACU, R L Hearing Branch 1 BO/O&/30 Ip
B0073O0372 Forward* notice of withdrawal of caunitl RM Sandvlt
appearance -of FM Dttrander as counsel for State of OR
flAHDVIK, R. M Dragon, State of 8O/O7/03 Ip.
80 O7 30 037 S Faruards notice of uiithdraual of counsel RK Sandvilt
appearance of FW Ostrandor as tnunsHl for State of CR
SANDVIK.H h Oregon, Statt of 80/07/03 Ip
— D007300377 Notice of withdrawal of counsel RH Bandvik & appearance of
FU Oitrander *» «nun«il for State of OR C&rtiFicata of
Svc *ncl.
DSTRAKDER.F M Oregon, State of BO/07/03 3pp
— B007300377 Notice of withdrawal of cauns*! RK Bandvik fc appearance of
FU Dstrandflr as counsel for State of OH Certificate of
SvC end
OSTRANDS-fi, F W Oregon, State of BO/07/03 3pp
HOO<711004S Bchadult setting 600731 for applicants & NRC to luhmlt npta
In r«ijoni« to ABL.B BO030i order, Paragraph 14 C Applicant!
njit itifllcat* Intention to changt lite EC NRC munt explain
itfttui of T»»pon*e to appllcanti' OC0213 submlttal
DEALE.V. D. Atonic Safiti) and Licensing Board Panel 9O/07/OS Ip
S007110D42 Schedule setting B00731 for applicants & NRC to submit rtipts.
In response to AEL0 BO 00 06 order- Paragraph 14 C Applicants
must indicate intention to change site J" NRC must eiplaln
status of response to applicants' 800213 euimlttfll
DEALE.V.B Atomic Safety and Licensing DoarJ Panel BO/07/'QB Ip
9007230797 Notion for ordar evidencing current statui d »«ttins
ichediile for further proceeding Amend t-o applicati-on ulll be
filed by 8O0930 Anticipated echndule POT environ rept fc PBA.R
•inindi nay be filed on sane date M/oYaft order h rvledio.
THOMSEN, F.T. Portland Osneral El«ctric Co THOMSEN,F T P«rkin»i
Cale, 9ton*i Dl »«n b Milliams BD/07/16 7ftp,
B007230797 Motion for order evidencing current status & letting
schedule for further proceeding Ain«nd t<n application ulll be
fllefi by B00930 Anticipatfli Bchedule for environ rept It PSAR
amends may be filed an sane date W/draft order !• release
THDMBENjF T Portlanii Oeneral Electric Co THOMSEN. F T Peri ins,
Coi*. Stone, Ols*n 8. Mllllami BO/07/14 7pp
0007390391 Forwjirdi 80OB14 ecrUficate of svc inadvertently omlttatf
fro* SOO71<o corrtipandence
THOMSEN, F- T. Perftinl, Coie, Stone, OloBn fc Wl 1 1 iami BO/07/17
3pp.
B007250351 Foruiards D 00-316 -certiPlcate of s-vc inadvertenttg omitted
From B0071A correspondence
THOHSEN.F T Perkins, Cole, Stone, Olson t, Hi 111 ams HO/O7/17
0 Inspection raportii IE Bullttini & c orreejiandenc*
0 Insaectlon reports, IE Bulletins it corresp ondonc e
Foruardn IE Info Notice SO-HA, "Evaluation of Contractor
OA Program* " No written response required
EHQELKEN'R H Ragion 9, Ban Franciico, Office of the Director
90/OA/10, Ip.
B007S20a44 Foruarda IE Info Notice BO-2A. "Evaluatlpn of Contractor
OA Prosrams " No written response required
ENCELKEN.R H Region 3. 3an Francisco, Office of the Director
BO/Oii/10 If
9007140410 Forwa-fds IE Bulletin 90-i4, "Degradation of BWR Scram
Discharge Val Capability," No written response required
EHQELKEN. F H Region 3, Ban Francisco, Office of the Director
ao/o^/ia ip.
BOD71404la Forwards IE Bulletin 80-14, "Degradation of BWR Bcram
Diicharge Vol Capability " No written Tffsponse required
ENGELKEH, R N Region 5, San Francisco. Office of the Director
BQ/Ofi/12 Ip
DOCKET STH-SO-SSS SKAQ1T NUCLEAR POWER PROJECTr UNIT 5
A Application/construction stage documents & correipond'enct
DOCKET STN-SO-53B PALO VERDE NUCLEAR STATION, UNIT 1
A Application/construction stage documents *< correspondence
B0070303D9 Gamtients on proposed rules 10CFR50 Si 51 u/Suiinainlih Trlbel
CaiMiunitu andorsei position for Full consideration of Clan
9 •cctdNntt Urgei consideration of Class 1 accident in
Bkagit proceed ing-s. H/Cfrtif ieate at Bvc
OEHDLEH.M-W Skagltoniani Concerned About Nuclear Power, BO/06/17
4pp.
9007230001 Forward • statement of puUtij re vequiremints to b« met for
current OL app Ittaticnt, *i derived Prom NUREO-06i& & found
In NUREO-OA94
EIBEMHUT, D Q Division of Llcenainff BO/Ob/Sb Spp
B007S!Oa37 Biimmarv of 800311 rnneting ui/iJtfl in Sethesda.MD re r»vieu
plans for OL app! icatlons
LICITRrt.E.A Light Mat*r Reactors Branch 3 60/04/35 4p|i
B0070I03SO Forwartfs NRC r-uorganl latl on cltart tar Qfc at Nuclear Heactor
Regulation, effective SOO^aB Considerations re activities
should be made throwah assigned mat repi csenta tive-a Areas at
disagreement moij be dis-cirssed through infor-fflal appeal
TEDEBCO, R L Assistant Direttor For Licencing 00/06/13 Bpp
322
S0070202O9 Ac k receipt >. docketing of 7910O1 joint application for
OLs Forwards list of incomplete sections following
preliminary reviou of F9AR fc environ rept Discua-ssa
licensing procedures !< importance af timely communication
EISENHUT. D G Division of Licensing BO/OA/lfi 7pp
8007020194 Notification of 300709-10 meeting u/util in ttelhesda.MD to
KERR1QAN.J Licensing Branch a BO/OA/33 Upp
B007330Q01 Forwards statement of policy re requirements to be met for
current OL appl i cation 5., 35 do-rived From NUREO-OA60 h Pound
E1BENHUT,D fi Division of Licensing aO/Ot/26 2pp
60070B0227 Request! auth orl IB t i on under CPPR-141 , CPPH-1 42 b CPPR-143 to
use A9ME Code Caiec. N-374, a 1 ternati ve rules for eiamination
of ueltf repairs !, M-275i repair of melds
VAN BRUNT. E E Ariiana Public Service Co BD/06/57 lp
C007O"702B3 FijrtuariJ-s Dechtel Pouer Corp !< utll responses to open items
of Class IE dc pouer sijs review Rflaponsfi have been
submitted to- review board !. final resolution lull] be
submitted to NRC kuhen completed
VAN BRUNT, E E Arltona Public Service Co- B0/D&/3O lOpp
E00711037S Forwards proofs of -svc for applicant FBAR, OL applicati o-n,
ffeneral inFo t. environ roptireiiuirEd hij NRC BOOdlB Itr
VAN BRUNT. E E Aril ana Public Service Co BO/07/O1 Bpp
D Ad jud i catory correspondence
8007020680 Forwards 80091? Itr.Ffl notice & Director's decision under
1QCFR3 206 denying Friends of the Earth 791054 petition to
require supplemental environ statements -on Class 9
accidents at facilities
DENTQN. H R Office of Nuclear Reactor Regulation. Director
BO/06/1? 2pp
BOO7310243 Forwards Commission 000537 memorandum t ord*r containing
•decisions on DCS 7B030H petition for ret onaideration of
7QQ413 memoranJum b order UCB 771104 petition sought action
re fire protection for electrical cables
EIBENHOr, D G Division of Licensing BO/Ofa/35 B9pp
8007170539 Forwards H0070S FR notice re opportunitJ Por hearlnj on
application for OLt
ECHWENCER.A Operating Reactors Branch 3 60/07/03 3pp
— D007I7OB43 Notice of receipt of application for facility DLn notice of
availabilitg aP applicant environ reptinoticc of
consideration of iaauancp of Facility QLs b notice of
oppor ti>ni tij Pur hearing Nauspa>per notice end
ECHWEWCER.Cl Licensing Orsnth 3 80/07/02 lOpp
B00711000a Order granting extension until E007SS tor- Coramlislon to
elect to rsvieui decision nn enforcomont action renuei*.
D 0-80-33
HOVLE.J C OFPice of the Secretary of the Commission 80/07/OEJ
IP
B0073001Ot Notices of appearance in proceed Inn Certificate of Bvc «Ticl
Q£Hfl,A C . BISCHOFFjC A Ariiona Public Service Co BO/O7/23 3po
B0072BOS9a "Addl Info for Suppl 1 to Environ Rept. " re nacid for p«nr>
geographg b demographyi & applicant preoparational environ
programe Preliminary version
» Ariiana Public Service Co BO/07/33 Sfpf
Q Inspection ruportaj IE Bulletins b corretpondance
B007SBOO&3 Sitppls B0020B response to IE Bulletin 7 7-38 1 "Potilfcl*
Malfunction of NANCD EA1QO Limit Quitches at Elevated
Tempi " Bubj switch is supplied on 1 3-inch pneumatic
operated gate- valve. Qasfcets replaced prior to shipment
VAN BflUNT, E E Arliona Public Service Co HO/03/11 lp
S007S50357 ReipondE to IE Bulletin BO -03, "Lois of Charcoal frn* Std
Type 1 1. 2-Inch Trau Adlorber Cells " Type II tray adsorber
calls am not used at facility Filtration unit* used are
rechargeable* permanent^ single-uni t adsorbers,
VAN BRUNT, E E Ari lona Public Service Co BO/03/1S lp
BO0717O2AS Forurardi IE Insp Repts SO-32B/BO-03, SO-529/BO-03 k
50-330/80-09 on 6003O3-14 No nuncompl iance noted
BPENCERiO 3 Region 5i San Francisco. Reactor Construction 1
Engineering Support Branch, 60/05/20 2pp.
— B00717O270 IE ln*p Repts SO-32B/00-OS, 30-S29/BO-OS fc SO-930XBO-03 an
300303-14 No nnncompl lance noted Major areai in(pectid:unlt
i control bldg cable tray- concrete records ti Unit 3
containment baaemat concrete placement
VOFIDERDF1UEGGEN Region S, San Franciico, Office of tht Dinctor
DODDBi R T Region 3, San Franclscoi Reactor Construction fc
Engineering Support Branch SO/03/20 4pp
BDQ7Q10O16 Foruardi IE Info Notice BO-S3, "Loss of Suction to Emr|inc(
Feeduater Pumps " No written respon»« required
ENOELKEN.H H Region fl, San Francisco, Office of the Director
BO/05/29 lp
BOO7 32023 S Foruards IE Info Notice BO-S6, "Evaluation of Contractor
OA Programs " No uritten response required
ENOELKEN.R H Region S, San Francisco, Office of the Director
BO/06/ 10 lp
B007300316 Responds to IE Bulletin BO-OS re damage to chemical vol
control ay* tank* Thirty addl day* needed to obtain info
requested in Item 2
VAN BF1UNT, E E Arizona Public Service Co 80/06/10 lp
0007290030 Forward* IE Info Notice BO-SB, "Prompt Reporting of Info in
Accordance W/1QCFRSQ S3(i) " No written response requlrtd
ENOELKEN.R.H Region S. San Francisco. Office of the Director,
BO/Oi/13 lp.
6007270333 Responds to IE Bulletin BO-09 Two lupptter* milii Ui« of
hydramotor at tuators. Thirty-day extension necestary to
determine If actuators are used in safety-related sys It If
corrective actions required,
VAN BRUNT, E E rtrliona Public Service Co SO/04/ 17 lp
6007020477 Forward* IE Circular BO-15, "Loss of RBactor Coolant Pu«p
Cooling ti Natural Circulation Cooldoun " No written responsn
required.
ENOELKEH.R H Region 9, San Francisco, Office of the Director.
lp.
H Oenerfll correspondence
S0071103S4 Responds to 00040? Ur to R Dijan Each unit mill Include
separata fuel bldg for housing new fu-el aria, spent Fuel
poolr shipping caefc area & fuel pnal cooling tt cleanup »ijs
Detailed rtescription may be Found in FSARrSettion 9 1
SCHUENCER.A Licensing Dranch S BO/ 06/26 4pp
6007210016 Advices that accepted version of application for OLs Por
facilities li being f ormarded Listed previouslij submitted
3-ring iinder-s maij be dificarJed
SOUDEfi.d L Divialnn of Rules and Records, BO/07/07 lp
K Utilitv Final Bafetij Analyna Report (FBfiH) t amends
B007SB05BS Motifios that FBflfl (t environ rept complete b no further
action required Forwards revised ti neui pages to be
incorporated in next FSAR amend ti environ rept fiuppl
VAN BRUNT. E E Arizona Public Service Co BO/07/23 lp.
— B0073BOS90 "Addl Info For ftmond 2 to FSARi " r* geology, aei smolngy &
aeotethnical engineering op struc tura 1 dasigni t, integi-it«
of reactor cnolant pressure aoiin-dary Preliminary version "
*• Arizona Public Service Co BO/07/H3 l"7pp
8D071B03B& Foruardi IE Circular BO- 14, "Radioactive Cont*»inition of
Plant Dimtneralizeil Mater BIJI Si Resultant Internal
Contamination of Personnel. " No uritten reiponse required
ENBELKEN.R H Region 9, San Francisco, Office of the Director
BO/06/24 lp
BOO72303B1 Forwards IE nulls tin BO-16, "Potential Misapplication of
Rdsemaunt Inc Models 1191 d 1192 Pressure TrAnsmittffri
M/Either A or D Output Codes " Written response required
IE Circular BO- It also enc 1. No uritten response required,
ENOELKEH.R H Region 5, San Francisco, Office of the Director
80/04/27 lp
SO 073 00 530 Reiponds to 1C Bulletin BO-OS re damage to chemical vol
control <ys tanks No addl vacuum features needed for
justification LRS holdup tank* cannot collapse due to
vacuum
VAN BRUNT. E E Arizona Public Service Co BO/ 06 /a 7 2pp.
BOQ72905ti> Responds to IE Bulletin 80-0? re hydromotnr actuator
deficiencies Field adjustment of present unit* necessary
Springs uted have stroke length precluding permanent set
problem
VAN BRUNT, E E Arizona Public Service Co BO/07/03 Spp
323
80073-10343 Ack receipt of BQ0621 1 tr informing of steps taken to
eorract tttm at noncompliance noted in IE Inap Hepts 50-S2B/
BO-Q6. SO-529/BO-O6 & 30-530/BO-Q6 Corrective actions uiH be
vtrlflvd djring future insp
SPENCER- Q S Region 5i Ban Franciscoi Reactor Construction d
Engineering Support Branch BO/07/08 IP
1 — BOO721O946 Forwards response to item of noncomp 1 iance noted in IE Insp
ReptI 30-388/80-06. SO-SSv/BO-Ofb It SO-330/80-O6 on 800113-18
Hotic* of violation was more misunderstanding than omission
to rept.as situation ua> potentially reportable deficiency
VAN BRUNT, E E Ariiona Public Bui-vie a Co BO/O6/34 3pp
—BOQ7210S5i Forwards IE Inap Repts SO-S2B/BO-06. 50-329/BO-06 E.
90-930/60-06 on 800413-18 & notice of violation
SPENCER. 0 B Healon 3- Ban Francisco, Reactor Construction b
Engineering Support Branch BO/03/23 Spp
— 8007810363 Notice of violation from Insp on B00413-1B
* Rnfllon 3. Ban Francisco, Office of the Director BO/Q3/B3 Ip
-— BO07B1QS7B IE Intp Repti 30-328/80-06, 30-SB9/CQ-Oi tt 50- 330/8Q-Q(» an
8OQ415-1B Noncomplianc* noted failure to rept deficiency
within required reporting period
ECKHARDT.J H . HERNANDEZ, 0 Region 3. San Francisco, Office of the
Director DQDDB, R T Region 5j San Francisco, Reactor
Construction & Engineering Support Oranch. 60/03/33 6pp
BOQ7310305 Forward* IE Imp Repts 3O-32B/BO-07, 50-929/BO-O9 !<
50-153Q/&O-09 on OOO501-23,Ho none otnp 1 iance noted
SPENCER, O B Reoion 5, San Francisco, Reactor Construction <•
Engineering Support Branch BO/07/11, 2pp
— QO07310310 IE Insp Rept* 50-52B/BO-09, 30-329/80-09 Et 50-S30/BO-09 on
BOO 90 1-23 No noncoBipll»nc» noted. Major ar*as inspected Unit
1 caduildir qualification, containment, bldg closure-, pipe
h*ng*ri fc supports & electrical cable installation program
VORDERBRUE&OEN Region 5, San Francisco. Office oP the Director.
DQDDS. R T ' Region 3' San Francisco. Reactor Operation* Nuclear
Support Branch, BO/07/1O 3pp
B Rvportable occurrences, LERs ft related correspondence
6007020331 Forwards final deficiency rept re inadequate size of Figure
S1L away. *trut assemblies
VAN BRUNT.e E Ariiona Public Service Cn 80/06/33 2pp
• — BOO7020S33 Final deficiency rept ro Inadequate slie of Figure 211 tuag
strut assemblies. Stop work order issued Matl ul 1 1 be
raturnad to supplier Only safety-related auaij struts which
conply uj/ASME Bsctlon III code will be installed
* Ariiona Public Service Co BO/06/ 23 Ip
&OQT020S23 Forward* Interim deficiency rept re underfilled fillet melds
for »-fcr>uctural at eel,
VAN BRUNT.E, E Ariiona Public Service Co BO/06/26 Epp
— BO07020S29 Interim deficiency rept re undoralied fillet yeld* for
•tructural steel Caused by personnel error Welding
procedures fc qualification repts of five suppliers bo ing
revitued ti evaluated
» Ariiona Public Service Co QO/06/Hi Hpp
8007140207 Forwards final deficiency rept re NftMCO controls BerUs
EA 190 limit twitches
VAN BHUNTiE E Ariiona Public Service Co BO/O7/03 2pp
— B007140B17 Final deficiency rept re NAHCD controls Series EA ISO limit
••witches Top cover gavltat matl emits resin vapor uihich
tortnr deposit on internal components of suited Cause-d bi)
improper curing oP gasket mat! Qasfects will lie replaced
* Arizona Public Service Co 80/07/03 Ip
8007140339 Forwards interim deficiency rnpt re ope-rabllity failure of
vertical fire dampers
VAN BRWfT,E E Ariiona Public Service Co BO/O7/O3 Spp
— B007140341 Interim deficiency rept re opcraoility Failure of vertical
Piro dampir* Caused by lack of design tolerance on sheet
metal sides preventing full closure of damper door Tests d
tifign changes are being Implemented Final rept by B0091S
e Ariiona Public Service Co BO/07/03 Ip
— aoo716065B Final deficiency re-pt re Cnmsip, Inc
sys pump Protection for pump is inadequate in
inadvertent closure nf outlet valve m/pump ru
uill be modified per Comsip.lnc instructions
» Ariiona Publir Service Co BO/07/09 3pp
containment gas
caao of
nnino Units
BOO717O47O Foruiards final deficiency rept re visual insp rat^Br than
insp by liquid penetrant of c ir cumf erenti.il uolri joints an
ASME Section 1H. Class 3 piping sys
VAN DRUNT.E E Ariiona Public Service CD BO/07/09 3pp
— B00717O493 Final defitiency rep t re visual insp rather than insp by
liquid penotrant of circ umf erent i ill uield joints on ASME
Section 111, Class 3 piping iitja Welds reinapected by liquid
penetrant Three- deficient melds discovered t rspaireif
» Ariiona Public Barvico Cn
B00729O72S Final deficiency rept re I tiadeauate embedment of anchor
bolts for seal tables Caused by mniGkmn of anchor bolt
Bitension in design drawings Design change uill be
Implemented to reflect proper anchoring in concrete
VAN BRUNT.E E Ariiona Public Service Co 80/07/31 flpp
80O729O773 Final deficiency rept re inadequately designed reinForcing
steel in mails of main steam support structure Caused by
failure to use dynamic load factor of 3 O in design Dealgn
change package uill be implemented
VAN DRUNT.E G Ariiona Public Service Cn BO/07/31 IP?
DOCKET STN-SO-529 PALO VERDE INUCLEAK STATION, UNIT 3
A Application/construction stage documents ti correspondence
H00721O237 Summary of B00311 meeting u/util In Detheada.MD re review
piano for QL applications
LICITRA. E A Liglil Mater Reactors Dranch 3 BO/Q4/23 4pp
8007010550 Faruards WRC reorgani ifltlon chart for Ofc of Nuclear Reactor
Regulation., effect ivo 80042B Con-si derations re activities
should be made through assigned mgt representatives Areas nf
disagreement may bit discussed through informal appeal
TEDESCO. R L Assistant Director for Licensing 00/06/13 2pp
8007020309 Ack receiot t< docketing of 7910Q1 joint application for
OLs Fctriuai-ds list of Incomplete suctions follnuing
prElimlnai-y rDVleu of FSAR fc environ rept Discusses
licensing procedures EJ importance of timely communication
GISENHUT.D G Divlsinn of Licensing 80/06/16 7np
8007020196 Notification of B007O'?-1O meeting ui/util in Buthevda.Hu to
discuss at pouter sys
KERRIQAN.d Licensing Branch 2 80/06/23 Spp
0007230001 Forwards Btatoment of policy re requirements to be met for
current OL applications, as derived from NUREQ-Oi>60 & found
In MUREO-0694
EIBENHUT.D Q Division of Licensing 80/06/06 Spp
BO0703O327 Requests author i I at i on under CPPR-H1. CPPH-1 43 tc CPPR-143 to
uie AShE Code Cases N-a74. alternat i va rules For eiamlnation
nf loeid repairs & N-375, -repa 1 r of tielits
VAN ERUNT.E E Arliona Publii. Service Co 80/06/27 Ip
BO0709OSB3 Forwards Dschtel Power Corp tt utll responses, to open items
of Class IE dc pomer ays review Responses have been
submitted bo revkeu board & final resolution uill be
submittad to NRC uihen completed
VAN BRUNTj E E Ariiona Putilic Service Co 80/06/3O lOpp
800711O39B Forwards proofs of svc for applicant FBAfii DL application,
general info b environ rept. required by NRC ElOOilB Itr
VAN BRUNT, E E Ariionfl Public Sc-rvlce Co BO/07/01 8pp
6 Adjud ica tory cart eapondencE
BO070ao&8O Forwards 800319 Iti-.Ff notice d Director's decision under
10CFR3 SO6 denying Friends nf tho Earth 791034 petitimi to
require supplemental environ statemnnts on Class 9
accidents at facilities
DENTOM.H H OJfFite of Nuclear Rnactor flflgulation. Director
eO/Ot/19 2pp
BO071&OA9K Forwards final deficiency rept re closure of Comsip. Inc
containment gas analysis pump valve
VAN ERUNT.E E Arizona Public Service Co 80/07/09 Spp
BQQ73I0243 Forwards CoimnisBiim 80OS27 mnmorandi>m !< order containing
diciiions. nn UCS 780302 putitlon for roconaideration of
780-413 memorandum b order -UC5 77110-1 petition nought action
re fire protection for electrical cables
EISENHUT, D 0 Division of Licensing 00/06/25 B9j> p
324
HOO717033B Forwards 81)0702 FR notice re opportunity For hearing on
application For OLa
BCHWENCEH,A Operating. Reactors Branch 3 00/07/02 3pp
— 0007170542 Notice oF receipt of application for facility OUsinoticc of
aval lab 1 1 1 ty of applicant environ reptinotice of
consideration of i&suance of Facility OLs (c notice at
opportunity fur hearing Newspaper notice encl
ECHWENCLTFI, A Licensing Branch 3 BO/07/03 IQpp
8007300516 Responds to IE Bulletin 00-05 re damage to chemical vol
control ays tanks Thirty addl days needed to obtain info
requested in Item 3
VAN BRUNT, E E Ariiona Public Service Co 00/06/10 lp
800729O08O Forwards IE Info Notice BO-2B, "Prompt Reporting of Info In
Accordance H/10CFR30 9S<e) " No written response required
ENGELKEN.R H Region 3. San Francisco, Office of the Director
BO/06/13 lp
B007110O02 Order granting citpn^ion until B00722 for Commission to
elect to review decision on enforcement action request.
DD-BO-23
HDYLEi J C Office of the Secretary of the Commission 80/07/08
6007290933 Responds to IE Bulletin 80-09 Two suppliers ma** use of
hydramotor actuators Thirtu-day extension necessary to
determine if actuators are used in safety-related ays & if
corrective actions required
VAN DRUNT,E E Ariiona Public Service Co BO/06/17 lp
BOD730010(j Notices oF appoaranc
OEMFl.A C , aiBCHOrF.C A /Ir
M General correspondence
In proceeding Certificate of Svc
ona Public Service Co SO/O7/23
end
3pp
B007080477 Forwards IE Circular B0-19i "Loss of Reactor Coolant Punp
Cooling tc Natural Circulation Cooldouin " No written response
required
ENQELKGN.fi H Region 5, San Francisco. Dffic» of the Director
BO f Ob/30 lp
BOO7110936 Responds to HOO407 1 tr to R Rifan Each unit ulll Include
separate fuet tldg for housing neui fuel area, spent Fuel
pnoli shipping cask area & fuel pool tooling (, cleanup sys
Detailed description maij be Pound in FSAR, Section 9 1
SCHHENCER.A L teens ing Branch 2 BO/06/36 4pp
80Q71B02B6 Forwards IE Circular BO-14, "Radioactive Contamination of
Plant Demineratlied Water Bye & Resultant Internal
Contamination of Personnel " No written response required
ENUELKEN.R H Region 3, Son Francisco, Office of the Director
00/06/24 lp
B-QO7210CHE) Artvi se-a that accepted version of application For OLs for
Facilities ia hplng forwarded Listed previously submitted
3-rlng binders may be discarded
SOUDER.J L Division of Rules and Records 80/07/07 lp
K Utility Final Safety Analysis Report (FBAH) t< amends
6007350939 Notifies that FSAfi !c Environ rept complete !i no further
action required Toruiarda reviaod b nau pages to be
Incorporated In next FBAH amend t, environ ropt suppl
VAM DRUNT.E E Arl.ana Public Service Co SQ/07/23 lp
B007S303QI Faruards IE Bulletin BO-16, "Potential Misappllcfltlon of
Hosemount Inc Models 1191 d I19P Pressure TranBmitters
W/Either A or D Output Codes " Written response requlrtd
IE Circular BO-16 also encl No written response required
ENQELKEN.R H Region S, Snn Francisco, Office of the Director
80/06/27 lp
B007300330 Responds to IE Bulletin BO-03 re damage to cheBlcal vol
control sys tanks No addl vacuum features needed for
justification LRS holdup tanks cannot collapse due to
vacuum
VAN BRUNT-E E Ariiona Public Service Co BO/06/27 2pp
-BC-Q72BO39Q "Add! Info for Amend 2 to FSftR, " re geology, seismology b
geotechnlc a 1 Hnglneering of structural design, fc inteoritu
oP reactor coolant pressuro Boundary Preliminary version "
M ATiiana Public Servico Co BO/O7/23 19pp
-B0072B059B "Addl Info for Suppl 1 to Environ Bept, " re need for pouierr
geography !i iiemoornphij , & applicant prcoperational environ
programs Preliminary version
• Arliona Puhlic Service Co BO/O7/23 29pp
ft lT>Bpoctlan reports, IE Bulletins & correspondence
B007S90316 Responds to IE Bulletin BO-Q? re hydrometer actuator
deficiencies Field adjustment of present units necossary
Springs used have stroke length prec lud Ing permanent set
problem
VAN BRUNT. E E Ariinna Public Service Co BO/07/03 Bpp
B00721QS43 Atk receipt of B00624 Itr informing of step* t«k«n to
correct item of nnncomp 1 lance noted In IE Imp Hants 30-32B/
B0-06i 90-509/90-06 !. 90-930/00-04, Corrective actions will be
verified during future insp
SPENCER, 0 B Region 3, San Francisco, Reactor Construction It
Engineering Support Branch BO/07/OB lp
BQO72BQQ63 SuppU H0020B response to IE Bu]ifltin 79-23, "Possitle
Malfunction nf NAI1CO EAlflO Limit Switches at Elevated
Temps " Bubj switch is supplind nn 1 5-inch pneumatic
operated gate valve Qasfcets replaced prior to shipment
UrtM BRUNT. E E flriiona Puolic Service Co 80/03/11 lp
— 8007S10B46 Forwards response to item of nancprnpllance noted in IE Imp
Repts 30-930/60-06, 30-329/80-06 St 50-930/80-06 on B00413-1B
Notice of violation uas more misunderstanding than omission
to rapt, as situation uas potentially reportable deficiency
VAN QHUNT.E E Ariiona Public Service Co BO/06/B4 3pp
B007H30357 Responds to IE Bulletin BO-O3, "Loss of Charcoal from Std
Tijpo II. 2-Inch Tray Adsorber Cells " Typp II tray adsorber
cells are not used at facility Filtration units used am
ret hargeab 1 e, permanent. B ingla-unl b adsorbers
VAN DHUNT. E E Ariiona Public Service Co BQ/03/1B lp
OOO7I7036S FnruiarifS IE InBp Ropls 50-520/BO-03, 90-9a9/BO-03 b
90-930/80-05 on 900303-14 NO noncomp 1 ianco noted
BPEWCEH.O B Roglan 5. San Francisco, Reactor Construction tt
Engineering Support Branch BO/09/PO 2pp
— -B007I70270 IE Insp Repls 30-528/80-05, 30-329/BO-05 R 30-330/80-09 On
BOD303-14 ND noncompl tance noted Major areas inspected Unit
1 control lildg caale tray, concrete recorils & Unit 3
containment ba.*(iinat concrete placement
VORDERBRlJEaQCM Region 5. 9an Francisco, Office of the Director
DDDDS..R T Rngiun 5. San Franciscn, Reactor Construction !•
Engineering Support Br-anch BO/03/50 4pp
8007Q1-QQ16 Foruiari)» IE Info Notice 80-23. "Loss of Suction to Emergency
Fedditfater Pumps " No url tlen response retired,
ENOELKEN.R H region 3, San Francisco, Office of the Director
BO/03/a1? IB
B007S20a39 Foruarde IE Info Notice BO-HA, "Evaluation of Contractor
OA Programs " No written response required
EH0ELK6N'R H negion 5, San Francisco, Office of the Dirsctor
ao/06/10 lp
--8007210SB6 Forwards IE Insp fiopts 90-9SB/BO-06, SO-S29/BO-OA fc
5O-S30/80-06 on 80041S-1H ft notice of violation
SPENCER, 0 S Region S, San Frantiuco, Reactor Construction fc
Engineering Support Branch BO/03/23 Hpp
-8007310565 Notice of violation from Insp on B0041S-1B
It Region 3. Ban Francisco, Office of the Director
BO/QS/B3 }p
—3007310378 IE Insp Repts 30-32B/8O-06. 90-929/00-06 t> 30-S30/BO-06 on
800413-1B Noncompliance noted failure to rept deficiency
Within required reporting period
6CKHARDT.J H , HEHNANOEZ, 0 Region 3, Son Francisco. Office of she
Director DP.DDS, R T Region 9, San Francisco, Reactor
Construction t, Engineering Support Branch BO/09/H3 App,
8007310303 Forwards IE Insp Repts 30-52B/BO-09, SO-329/BO-09 d
30-330/80-09 on 000301-33 No noncompl lance noted
SPENCER, 0 B Region 3. San Francisco, Reactor Construction l>
Engineering Support Branch BO/O7/H 3pp
— B007310316 IE Insp Repts SO-92B/BO-09, SO-529/80-09 t, 30-930/BO-09 on
B00301-23 No noncompliance noted Major areas inspected Unit
1 caduelder qualification, containment bldg closure, pipe
hangers fc support* t, electrical cable installation program.
VOHDESERUEQOEN fiegion 9. Ben Francisco, Office of the Director
DODDB.R T Region 5, Ban Francisco, Roactor Operations Nuclear
Support Branch 80/07/10 Bpp
DOCKETED ITEMS
325
f occurrences, LERe & related correspondence
ds interim deficiency rept r* under? i led fillet uelds
steel
Arizona Public Service Co QO/OiVafi 2pp
. Interim deficiency rept r« undersiied Fillet luelfla far
£*,£! steel Cauied by personnel error Welding
j* ?i & qualification repts of five suppliers being
)\ & evaluated
t^f* Public Service Co HO/Gt/Hfo 2pp.
i*
-.(iruards final defi-ciencu, rnpt re NAMCO controls Series
• it sultches
l<*e E Ariiona Public Bervlce Co 80/O7/O3 2pp
^ Final doPiciencu rept re NAMCD controls Series EA ISO limit
I ' Top cover gasket matl emits resin vapor which
f*ftjtlt on internal components oF suited Caused by
J * curing of gasket matl Caskets mill be replacn!
tf^na Public Service Co SO/O7/O3 Ip
^{irunrds interim dofieirncy rept re operabilitj failure of
tin damper*
*£ E Ariion* Public Service Co BO/07/O3 2pp
f Interim d«ficle<ncg repb re operab-i 1 i tg failure oF vertical
*lB,ji»r» Caused by lack of design tolerance on sheet
*jd*» prnventino Pull closure; of damper door T»»ts fc
*,Ji«ngf* Are btinj implemented Final rept bv 800719
(,11 a Public Service Co 80/07/O3 Ip
farutra* final dtf ic ienc u, rept re closure of Comiipilnc
f,t gas analijiii) piump valve.
f, £ E ATiiona Public Service Co BOy07/O9 app-
— £] Final d*Flcl>ncy rept re Comslp.Tnc containment gai analysis
^p Protection for pump is inadettuatv in case of
r«;ant closure at outlet valvo u/punp running Units
„ nndlflBd per C-on*lpiInc Instructions
,0na Publie BBrvice Co HO/07/01?. 3pp
poruards final deflciencg rept re visual insp rather than
1 iquld panetrant of circumferential ueld joint* on
tion IlliClass 3 piping sgs.
TJ E E Arizona Public Service Co 00/07/09 Spp
f3 Final deFiciencu rapt re visual inep rather than, insp bu
penetrant of c i rcunFertntla 1 uield joints an A3HE
n Ill.Clasi 3 piping sg> Melds ralnspected by liquid
ant Thre* deficient uelda discovered & repaired
x«na Public Service Co 80/O7/09 2pp
Final dePiclencg rept rv inadequate embedmont of anchor
r teal tab-leu Cauaejf bg omiiaion of anchor bolt
n in design drawings Design change nil I be
t*tl to raflict proper anchoring In concrete
T,E E Arliona Public Service Co. BO/07^21 4pp
-90-330 PALD VEnDE NUCLEAR STATION. UNIT 3
* Ion/construction stage document* ti c-arretpondnnc H
Bumm»rij of B00311 meeting u/utll In Bethesria.MD re revlau
*; DL •ppllcatlons
^- A Light Wat»r Reactors Branch 3 BO/04/SS 4pp
''orujarda NRG reoTganiiation chart foT Ofc of Nucloar Reactor
**h, ef f ic tiv* BOO 4 2 D Consld*rati on« n activities
e mad* through assigned mgt rapr>*entatlveR Areas of
?»iit may be dUcu*Bnd throunh informal appeal
^-L Assistant Director for Licencing 80/O6/13 Spp.
Ac* receipt & docketing of 791O01 joint application for
^''ds Hat of Incomplete sections f olloui'ng
^>y pavleu op FBAR d environ rept Dlscuttaa
s prDceduris & importance aP timelij communication
* ft O Division of Licensing BO/06/ 16 7op
BO-070BO227 RenuEats su t hDn i at Ion under CPPR- 141, CPPR-lta & CPPR-143 tf
use ABME Coile Ta-ses N-37fli al tcrnati VP rules For eiamination
of ucld repairs £ N-279, repair of uelds
vYIN BRUNT, E E Ariions Public Service Co BQ/O6/37 Ip
8007090235 Fortran)* Derhtfll Pnutr Corp t. util respotiaes to open
of Class IE d t power aijs revieui lleEpansc^ hdvo been
submitted to revieui board !i final resolution uiill ac
submitted to NRC uheti corap 1 etEd
VAN DfiUNT.E E Arlmna Public Service Co BQ/Q6/3Q lOpp
BD071 1O39O Foruardi proof! oF svc for applicant FSrtfl, DL application.
general info !, Environ rep t, required by NRC 300616 Itr
VAN BRUMT.G E Ariiona fublic Service Co 30/O7/O1 Bpp
Ad jud icatorg torresp ondenc e
eO07O2OfiBO Foruards BOO1!!? ItrpFH notice •!< Diroctor's decision under
10CFFJ2 306 denying Friends of the Earth 791034 petition to
require supp 1 Ofncnta 1 environ statompnls on Class 1
acciderts at fatillttus
R Office -of Nuclear Hoactar Rogii lation, Director
Epp
6007310343 Forward B ComnqjjsiDn SO05S7 mcmoranduiii t. order containing
decisions on UCB 790502 petition For reconsideration of
7B0413 memorandum & order UC8 771104 petitmn sought action
re fire protection for electrical cables
ElBENHtmD 0 Division of Licensing QD/CW25 B9pp
800717O53B Forwards B007O2 FR notice re opportunitij For hearing on
application For OLs
SCHMGNCEJt. A Operating Reactors Dranch 3 BO/07/02 3pp
Notice of receipt oF app 1 nation for facilttij OLiinotice OF
availability of applicant environ repti notice of
consideration of issuance of facility OLa !< notice of
opflortunity for hearing Neuapapcr notice enc!
BCHUEHCEW, A Licensing Dranch 3 BO/07/Oa lOpp
60071 100D2 Orrier oranting ei tension until BQ0732 for Commission to
elect to review decifiion on enForcument action request*
QD-BQ-B3
HOYLE.J C Office of the Secretary of the Cammisslgn GO/07/OB
IP
S00730010i Notices of appearance- in proceeding Certificate of SVC frncl
GEHIti rt C . BIBCHOFF.C ft ftruona Public Snrviee Ca BO/07/33 3pp
H Ccntirfll correspond once
B007U052d Responds to 800409 1 tr to R Ryan Each unit will includ
teparata fuel lldg for housing new fuel area, spent fuel
pool, shipping c.aak area tr Fuel pool cooling (< c leanup tyi
Detailed description mag be Found in FSAR, Sect ion 9 1
SCHWENCER./! Licensing Branch a BO/Ob/St, 4pp
Advises that accepted version of application for OLs for
DB is fading faruiariiud Listed pravlously submitted
3-ring binders naij be discarded
BmJDEft.J L Division of RoUs and Records E30/07/07 Ip
K Utility Final S-aFetij Analgsis deport (FBAR) 6 amends
BOQ72BO5B5 Notifies that FSftR J. environ rept complete !t no furlhSV
action required Forwards rHviood t, new pages to be
incorporateif in neit FSrtft amend ti Environ rept supp 1
VAN DRUNT.E E ftruona Public Service Co SO/0//23 Ip
— B0073S0590 "Ad d 1 InFo for rtmend 2 to FHAFI. " re neolojg. selsrainl ogu
gaotochnical engineeTing of stvuctnral dpsi^n, t. integrity
of rDactor coolant presEuro boundnry Prtl iminarg version "
* Amona Public Service Co BO/07/Hn llpp
— 8007280593 "Addl Info for Suppl 1 to fTnvircn Rept," re need for p
geography- & 4 emographij. !> applicant preoperat iona 1 environ
programs Preliminary v am ion
» Ariiona Public Service Co 80/07/23 B-9pp
Notification of 8Q0707-1Q meetlna ln/util in BethesdaiMD to
^ power BIJ*
>J Heenilng Branch 3 aQJQb/33 Zpp,
.^oruiards itatement of policy re requirement* to be met "or
r1. applicationsj a* derived from NUREO-OociQ & found
Division of Licensing
2pp
Q Inspection reports) IE Bulletins 1 corre
E3007Sa0063 Suppls S0020E) response to IE Hulletin 79-23, "Passible
Malfunction of NftMCQ EA1SO limit Buitcht-5 at Elevated
Temps " Subj auttch is supplied nn 1 3-lnch pneumatic
operated sate vtilve Oaskote replaced prior to ihipment
VAM DftlJNTi E E ArilDna Puhlic aarvlce Co BO/03/11 Ip
DOCKETED ITEMS
173S0357 Responds to IE Bulletin BO-03, "Lose of Charcoal from Btd
ype Hi 2-Inch Tr.nj Adsorber (.ells " Type II tray acisorbar
ells are not used at facility Filtration units used are
•echargeab l*i permanent, single-unit adsorbers
'AN BRUNT. E C Ariiona Public Service Co BO/O3/1B 1 9
)7170265 Forwards IE Insp Repts 5D-S2a/BO-05. 50-529/GO-Q3 !<
}0-33O/ao-O3 on B00303-14 Nu nnncomp] ianc e doted
iPENCER.G S {legion 5. San Francisco, Reactor Construction (c
:ngineeri.ng Support Branch aO/O5/2O 3pp
00717027O IE Inip FlBpts 50-3.28/BO-05. 5O- 529/BO-O5 & 30-330/00-05 on
800303-14 No noncompl lance -noted Major areas, inspected Unit
1 control bldg cable trag. c onereti* records b Unit 3
containment basemat concrete placement
vDRDERBRUEGQEN Region 5, 5<m Francisco, Office of the Director
DODDS, R T Region 5. San Francisco. R&actor Construction tc
Engineering Support Branch BO/OS/aO 4n p
>7010O16 FnruardB IE Info Notice BO-33. "Loss of Suction to Emergency
:eeduater Pumps " No written response required
:NGELKEN,R H Region 5, San Francisco, Office of tlia Director
!0/05/a<? Ip
17S2Q235 Forwards IE Info Notice BO-26. "Evaliratlon of Contractor
A Programs " No written response required
iNOELHEM.n H Region 3- Ban Francisco, Office of the Director
10/06/IO Ip
17300516 Responds to IE Bulletin 30-05 re damage to chemical val
•ontrol sys tanks Thirttj addl days needed tn obtain info
•equested in I torn 2
'AN BRUNT, E E Ariiona Public Service Co HO/Ofi/lO Ip
— a007aiO35& Forwards IE Inap Rents SO-52B/SO-06. 30-329/80-06 t,
SO-330/BO-06 on B00415-1B t, notice of violation
SPENCER, Q S Region 5. San Francisco, Reactor Construction 6
Engineering Support Branch 60/05/33 3pp
— B007210365 Notice of violation from inap on B00415-18
* Region 9, San Francisco. Office of the Director SO/O3/B3 Ip
— 800731057H IE Insp (lepts SO-32B/SO-O6, SO-529/BO-O6 t, 30-930/80-06 on
BQ0413-1B Noncompliancn noted failure to rept deficiency
within required reporting period
ECKHARDT.J H . HERNANDEZ, O Region 5, San Francisco, Office of the
Director DODDS, R T Region 5, San Francisco, Reactor
Construction I* Engineering Support Branch BO/03/23 6pp
B00731Q9Q-3 Forwards IE Insp Repta 30-328/80-09,30-329/80-09 b
30-530/60-09 on 300301-33 No noncomp I iance noted
SPENCER, 0 S Region 5, Ban Francisco, Reactor Construction &
Engineering Support Branch BO/O7/11 2p.p
— B007310516 IE Insp Hepts 90-32B/80-09. 50-329/BO-09 t< 30-330/80-09 on
BO0301-23 No noncompl ionce natod Major areas inspected Unit
1 cadueldcr qual i ficat ion, containment bldg closure. pipe
hangers b supports ti electrical cable installation program
VORDEfiBRUeGQEN Region 3. Ban Francinco, Office of the Director
DOODS, 11 T Region 3< San Francisco, doactor Operation! Nuclaar
Support Branch BO/07/10 Spp
B Reportable occurrences, LERs *c related correspondence
B00702O3H3 Fpruiards Interim deficiency rept re undersiied fillet welds
for structural steel
VAN BRUNT.E E Ariiona Public Service Co SO/06/26 Spp
'7390QBO Forwards IE Info Notice BO-2H, "Prompt Reporting of Info in
iccordance U/10CFR90 33<e> " No- written re-sponse required
1NCELKEN.R H Region 5, Ban Francisco. Office of the Director
iO/O6/13 Ip
7390523 Responds to IE Bulletin BO-Q9 Two suppliers make use of
udramotor actuators Thirty-day extension necessary to
etBrmine if actuators aro used in safety-related sij-s (< if
lorrective actions required
'AN BRUNT, E E Ariionfl Public Service Co BO/06/17 Ip
— 8007020529 Interim deficiency rept ro undersiied fillet ueldi for
structural steel Caused by personnel error Molding
procedures & qualification ropts of five suppliers being
reviewed tt evaluated
* Ariiona Public Service CD BO/06/24 Spp
B0071A0516 Forwards final dof ic ioncy rept re douel omission during
concrete placement
VAN BRUNT.E E Ariiona Public Service Co HO/07/OB 2pp
7020477 Forwards IE Circular 30-13. "Lno* of Reactor Coolant Ptimp
ooling ti Natural Circulation Coo]d QUITS " Ho uiritten recpomse
•equired
[NGELKEM, H H Region S. San Francisco, Office of the Director
10/06/20 Ip
— 0007160531 Final deficiency rept re dowel omission during concrett
placement Dowels which tie into slab were added prior to
concrete placement Douel ommission isolated case fc no
further invHstigations nocesBaryi
* Ariiona Public Service Co 90/07/03 Ip
17 10 020 (j Foruiards IE Circular BO- 14. "Radioactive Contamination of
lant Deminera 1 1 led Water Sys it Resultant Internal
ontamlna tian of Personnel " No uirlttcn re^pnnte requirid
:NGELKCN,R H Region 5, San Francisca, Office at the Director
10/06/24 Ip
I72303B1 Foruarda 1C Bullotin SO-li, "Potential Missppl i Cat! pn of
osemnunt Inc Models H31 fc 1153 Pressure Transml ttera
I/Either A or 0 Output Code a " tlritton responee required
E Circular SO-1& also ercl No uintten response requlrei)
:NOELKEN,R H Region S> Sari Francisco, Office of the Director
O/Oi/27 Ip
7300530 Responds to IE Bulletin BO-OS re damage to chemical vol
ontrnl aija tankt Ho addl vacuum features needed for
unification LI) 9 holdup tanks cannot cnl lapse due to
>acuum
AN GFIUNT, E E Ariiona Public Service Co BO/06/E7 Spp
17390516 RBBponds to IE Bullotin BO-09 re nydromotor actuator
dficiencies Field adjustment of present units neceosary
prlngs used iiave atroke length precluding periianont set
rob 1 em
AN DRUNT.E E Arnona Public Service Co BO/07/03 2p(i
7210543 Ack rereipt of BOObSI 1 tr informing of steps taten to
orrect item of non compliance noted in IE Inap Roptt SO-S3Q/
0-06, 30-5a9/Bu-Oft ti 50-Saa/BO-O6 Corroctive actions uill fre
rerlfied during future insp
PENCEH.O 9 Region 5. San Francisco, Reactor Construct i on t
ngineering Support Branch SO/Q7/OS Iji
1007210346 Forwards response to item of noneompl ianc e notetf in IE Insp
flaptu S-O-bSS/80-06, 50-529/BO-O6 t, 30-530/80-06 on B00413-18
Notice of violation was mitro ml sunfierEtanding than omission
to rept.as situation mas potentially reportabla dof i c IfiTlci)
VftN BRUNT.E E Ariiona Puolic Service Co flO/06/?4 3pp
BD07160632 Forwards final deficiency rept re closure of Com»tpi Inc
containment gas analysis pump valve
VAN BRUNT.E E Arizona Public Service Co 00/07/09 2pp,
— B007160&SS Final deficiency rept re Comsip.Inc containment gas a
sijs pump Protection for pump is inadequate in case of
Inadvertent closure of outlet valve w/pump running Units
uill be modified per Comsip, Inc instructions
* Apiiona Public Service Co 00/07/09 3pp
DOCKET 30-537 CLINCH RIVER BREEDER FJEACTDfl
B. Utility Preliminary BaFcty Analysis Report, amend*
B0070B02&'! Forwards affidavit confirming distribution of PBAR Amend S3
to local public, officials & EPA representative*
CQPELANDjR L Energy. Dept pf, Clinch River Breeder Reactor Plant
BO/07/03 app
F Security, medical, emergency li fire protection plans
B0070103&6 Forwards physical security plan Plan withheld
(ref 10CFH2 790)
CDPELAND^R L EnergyiDept of, Clinch River Breeder Reactor Plant.
HQ/06/27 4pp
BO071O019^ Foruiards revised responsos to Quostionn 4H1 3 t, 421.10
re physical security plan Responses uithheld (ref
10CFR2 790) Related correspondenca
COPELAND.R L Cnergy.Dept of, Clinch River Breeder Reactor- plant,
BO/06/27 App
DOCKETED ITEMS
DOCKET 9O-33B MfittPHlB STATE UNIv RESEARCH REACTOR
F Securitu,, medical, emergency tt fire protection plans
BOO728OBSA Forward! physical security plan for SNM of tow strategic
•Iflnificance Plan withheld (ref 1OCFR2 790)
JONES, D W Memphis State Unlv BO/O7/23 lp
0. Inspection reports, IE Bulletins fc correspondence
BO07170177 Forwards IE Circular BO- 1 4, "Radioactive Contamination of
Plant Demlneral i led Water Bgs & Resultant Internal
Contami nation of Personnel " No written response required
D'REILLV, J P Reolon 2, Atlanta, Office of the Director BO/06/24
HOQ7010031 Submits addl info oiieing from Sassafras Audubon Society
790*701 request For hearing TB heavy faults !i forwards B00610
Itr to DO Fry
STELLO. V Office of Inspection & Enfarrement, Office of the
Director BO/Ofa/lA Sgp
— 8OO701004-6 Ac k receipt of BOQ'JtlS reply tn re-quest for background info
on statement re heavy faults mude in 7909O1 request for
hearing Term was inappropriate Concrete structuras uiill
Eihibit cracks uhicti do not affect integrity
SHEUM/WEFl.n E Office of Inspection !. Enforcement* Dffice of the
Director SJO/06/ 1Q 3pp
— 8007010055 Responds to GOO508 inquiry re statement in 790901 request
For hearing on confirming suspension of const re heavy
faults Forwards 79O1I1 Indianapolis Star news article in
uhich statement appeared Requests any info an subj
FREY.O O Sassafras Audubon Society BO/OS/ 19 Zpp
DOCKET BTN-30-346 MARBLE HILL NUCLEAR STATION, UNIT 1
A Application/constructlon stage documents tt ccrre-spondence
8OO701OO96 Forward* utll revised project OA manual Contains resolution
of IE coiMents from review of previous manual Project mgt
procedural & ABHE OA manual uill be revieued for consistency
u/project OA manual. W/o end
SHIELDS, 9 M Public Service Co of Indiana, Inc BO/06/04 lp
80Q7Q1003B Advises of readiness for NIC ravieu & evaluation af It ami
A l.c ,d. ti B 1 of app to V Stal-lo 800313 Itr re graduated
revision of order dated 79OBI5
BHIELDB, B M Public Service Co of Indiana, Inc 00/06/19 lp
9OO7M09B1 Confirm! B00627 muting u/HD Menscer l< HA Darker at site to
discuss eonifc related activities
KEPPLER.J, O Region 3, Chicago, Office of the Director BO/06/24
B007110544 Notifies that action per 10CF«2 2Q4 is being taken to
consider commenta docketed on G00507 !t 14 re resumption of
const at plant Notice of request for action will be
published in FR
STELLO,V DFficB irf InspeEtiori & Enforcement. Office nf the
Director BO/O6/Ei 4pp
B007220S49 Forwards summary of latest (June 19BO) organ! lat ional
change Info includes revised organ! latlon charts & provides
overview identifying individual changes uhich afFect
overall QA program
SHIELDS. S W Public Service Co of Indiana. Inc BO/07/09 8pp
Inspection re-portn. IE Bullatins ti carrespnndenci
B007210363 Forwards IE Circular BO-13, "Srid Strap Damage In
Ues tlnghouse Fuel AssBmblieSi " Ho written response required
KEPPLER.J Q Region 3, Cnicago, Office of thfl Director BO/O5/2B
BO0783O001 Forwards statement of policij ra requirim*nt> to be met for
currant DL appltcatlcinB, a* d*riv«d from NUREO-OA6O ti found
in HUfl£0-Oi94
EIBENHUT.D.O Divition of Licensing 80/06/2i 2pp
80O7O10074 Forwards IE InFn Notice BO-H3, "Loss of SuctiDn to Emergency
Faeduater Puntpn " No u-ritten response ro^ulred
KEPPLER.J a Region 3, Chicago, Office of the Director flu/09/29
6007390142 Notifies that licensee revised OA program b prerequisites
nacviiarv far receipt inBpi under restart program Items A 2
li B. 3. ti*V» baen satlafactarilij completed Util is authorlted
to begin receipt insps far Item B,4,
BTELLO, V. OPficB of Inip«ction t< E-forcement> Office af the
Director. SO/07/07 Bpp.
F 8teurl*gt nedlcal, Hmero*nci| d firs protection plans
BO072S0971 R«qu*iti confirmation that divisional personnel located
onilte would not be covered by NUREO-04B4 h FEHA REP-1
unlen specific orslte emergencv assignments uere Involved
BHieLDS.S.W Public Service Co. of Indiana, Inc 80/07/19 2pp
0. Adjudicator^, cormpondtncn
BOO7100096 Foriifards IE Insp Flupts 50-516/BO-ll t. 50-317/90-19 or
QOD313 No none omp 1 ianc B notffd
DAVIS.A B Region 3. Chlcaao. Fuel Facility fc Materials Safety
Branch ao/Oi/O3 app
— HOO7100O99 JE Inap Repts :3O-94A/00-19 S, 50-547/90-17 on SQQS13 No
noncamjil iance noted Major areas inspected environ
monitoring program tc environ protection program
EB8IQ..T H , GREERpfi H Region 3. Chicago, Office of the Director
BO/06/02 3pp
90O71604il? FoTuards IE Insp ftepts 5Q-S1/i/BQ-\7 l< BO-547/80-17 on
600422-23,30 & 05 13 No none nrap 1 i ance noted
FIORELL1.0 Region 3, Chicago, fleactor Construction t Engineering
Support Branch BO/Ofc/lQ 3pp
BOO73 10243 Forutards Contmlsilon 800927 memorandum & order containing
d*tl*ion* on UCB 780 50 2 petition for reconsideration of
70O413 neniorandum It order UCB 771104 petition sought action
re fire protection for electric*! cable*
D. 0, Division of Licensing. BO/06/25 B?j>p
— BOO7160479 IE Insp Repte 5O-31A/HO-17 S. 30-S47/BO-17 on 800423-23.30
0513 No noncomp 1 iance noted Major areas inspected project QA
manua 1. pe-raonne 1 qualifications !i physical verification af
structural steel activities
SCHWEIHNINZ. E . HABRISOM, J J , WILUAMB.C C Reg 1 on 3, Chicago,
Dffice of the Director 130/06/O6 'Jpp
B007100S99 Discusses Save the Vallffu addl comments to Commissioner re
resumption of work at facility docketed on B00314 NRC uill
review document to dBtermin* uhether addl enforcement
Measures are appropriate
STELLD,V Office of Inspection fc Enforcement, Office at the
Director. 8O/O6/36 Zpp
— 8OO710030B Notlci tti*t Save the VallBij addl comments to Commitiioner re
resumption of word at f oci 1 ity, doc kutfld on QO0914'Ulll be
treated under 1OCFR2 SO6
BTELLO.V Office of Inspection t< .Enforcement, Office of the
Director 80/06 /Si lp
H General correspondent
80Q71103BB Forwards response to fl.ue*tion> i< comments presented
8OO32B public meeting. Util required to adhere to ASME code
for »«f*t«-relatBd piping »us Revised QA prooram description
encl.H/o descriptian,
BTELLQj V Office af Inspection b Enf or cement j Office af th«
Director 6O/03/23 Bpp.
8007220215 Forward* IE Info Nut ice 00-26, "Evaluation of Contractor
OA Programs " No written response required
KEPPLEfl.J 0 RflBinn 3- Chicago, Office of tnc Director BO/06/10
B007U01S7 Foruards IE Infn Notice ao-a?, "Degradation of Reactor
Coolants Pump Studs " Mo specific actl-on or response
required
KEPPLEn.J 0 Region 3, Chicagn, Office of the Director BO/06/1 1
B0070300S7 Ach receipt of BQOF>2a Itr Informing NRC of steps taken to
correct violations noted in IE Insp Repts 30--S46/79-02 (<
SO-547/79-03, 50-344/79-03 b 90-547/77-O3, 30-S')4/79-O4 d
S?-347/7'J-0'l
FIORELLIrB ReBlon 3, Chicago, Reactor Construct*"" «, Pnnlni»erini
Support Branch BO/0&/13 Ip
— B00702O031 ResponUB to NFJC Itf re violations
SO-546/77-OB, SO-947/79-O2. 5O-546/79-03, 50-
30-314/79-04 J< SO-517/7O-04 Corrattive at
re QC insp have been reuritton to rlarif(
SHIELDS, S W PiiUlic ServicB Co af Indlt
528
0072aOf>-31 Foruanls IE Info Notice BO-2B. "Prompt naportttig of Info in
Accordant!! IJy I OrFRSO 55 1 e ) " Wu written rcaponne required
KEPPLER, J G Region 3. Chicago, Offltu' of the Director 90/06/13
Ip
B007210D54 Act. receipt of 800123 final deficiency rept re joints in
safety-related structural steel
FIOHELLliG Region 3. Chicago, Reactor Construction ti Engineering
Support Branch BO/Q7/O3 Ip
B00714050/. llesponds to IE Bulletin BQ-09, "HyilTflmotDr Actuatqr
Deficient ten " Vendor will not utilirn incorrect spring matl
In facility actuators having greater than 3-inch stroke No
mod needed Fnr equipment qualification fir test programs
SHIELDS* S W Public Service Co of Indiana. Inc BO/Oi/18
B0072GO&I5 Ac k receipt of aOOISS final deficiency rtpt re u«o of
noncade matl in certain e ode, Category 1 component supports
FIPRELLliG Region 3. Chicago, Reactor Construction t> Engineering
Support Branch BO/07/O3 Ip
J0072307CH Forwards It Insp Uepts
E100501-31 No nnncnBiplian-ce noted
FIOHELLI.Q Region 3, Chicago. Reactor Construction
Support Ilraiieh BO/Ofi/l"? ^p p
t, 3O-947/BO-2a on
Engineering
—5007530710 IE Insp Kt-pts 9Q-")46./t30-2a ti SO-S47/DO-23 on BO0301-31 No
imncDmp I i.inc e noted Major areas inspected auiiliaru & fuel
handling bldga f, containment
HARRISON. J J , WILLIAMS, C C Hog inn 3. Chicago. Office of the
Director UO/Oo/ia 4pp
BOO702O94O Forwards IE Circular BO-IS, "Loss of Reactor Coolant Pump
Cooling d Natural Circulation f a o i il o uin " Nn written response
required
KEPPLEf?. J a RBjion 3, Chicago, OfFico at the Director 00/06/20,
»P
JQQ717Q51O Forwards 1C Circular BD-14, "Rail loac ti VD Contamination of
Plant nominal al i juri Mater Sys ^ Resultant Internal
Contamination of Personnel " Nn written response required
KEPPLER. J 0 HP g I on 3, Chicogu, Office of the Director 00/06/24
tp
3007230330 Toruarda !E Dullotln OO-16* "PotDnlifll Misapplication of
RoBemourl Inc Models liSJ It 1152 Pressure Transmitters
W/Either A or I) Output Codes " Written respoiiBe required
IE Circular BO-16 nlso Duel Ho written rcspon-SB renuired
KEPPLER. ,J 0 llagion t, Chlcagxi, Orfice of the Director QO/Oi/a7
IP
3007P30SUB ff0Epoiid3 to IE Bulletin BO- 08, "Eeam of Containment Liner
Pene trnt i itn Welds " Penetrations will be installed ypr ASMS
CDilD Wad i ograp h 1 c 01 aminat i ons of Tijpca 1 t* 3 fluvi! head
pcno trat inns mill be performed
SIHELD^.S W Puli lie Servico Co of Indiana. Inc GO/07/O3 Spp
10O7230093 Reaponds to IE Dulletin (10-05, "Vacuum Condition Resulting
in Damage la Chnmtual Veil Cimtral 9y n (CVCS) Httldup Tanks "
Design f va turc o ti propBr opuratini) procpdnrea onouro
adoquata jirntettlon iigninat vacuum damage
H Public Snrvlco Co of Indiorn, Inc BO/07/07 2pp.
J007200083 ForuuBj-da restart program ui/NRC hold points Dased on inap
Fin-d ings, wti ich confirm info repDrted in BO(Hi27 1 tr, c anc ludes
Itcna ft 3 !. li 3 uf restart program meet OA raquiremen t«
Program flCLB[itflblo
STELLOi V Office nf IrmpBrtion tt En f arc Bmimt. QPfitE of the
Dlruitor BO/07/O7 4pp
• Deportablu oce urri-nc ea. LCfis l< ralntod correopondenc o
J0071002H9 Interim doficiencij rspt re fertifiad matl teat TBptS for
uield filler matl fli'iHC has not pTovidcil code interpretation
of nnulTtmenl-i t-e repts tu date, but utll eipccts to Pile
Final ropt on or before CJ01001
SHlELD'3rS M Public 3*rvici> Cn nf Inrfiann. Inc [30/06/37 Ip
JQ0721Q012 /tele receipt of BO0 130 Pinil def> c 1 eneu, rept re damage to
containment liner un Unit 1
FIOKELLI.G nn-gion 3i Chiidon, Reactor Construction t< Englnoorlng
Support Branch RO/07/O3 Ip
f0075 1 0031 Ack rcroipt of BOOtOS interim Je-ficipncij ropt re problem in
opcraHon of ctintrl f u-ga 1 charain-g pump a nt mitt allDuablo
Floui rate
FIDnCLl.1.0 nt>i)inn 3< Clilciigo, Reactor Construr tlon ^Engineering
Bupport Dranch 80/O7/03 IP
1007210035 Ach receipt of (30CH29 Interim deficicincij rept re certified
matl test repts Cur m-o 1 d f i 1 tor matl
FIORCLH.O negiun lj Ctnragn. flonrtor ConB-truc tton ti Engineering
Support Ci-ancd BO/07/03 Ip
'007C1003I Ack rocippt of OOO'l^U final defic i nncy ropt re concrete
fluil 1 lari) bl Jg <9)<nn
FlOfiCLLI.O nnnlon 'J, Ctiic.iqu, Reactor Cons, true tlon It Eng inBaring
Support Branch fJO/07/OD Ip
B007ia053ii Act receipt of BQ0313 final deflciancij r*pt re failurt to
meet PSAtt basis secondary coolino floiu rate due to main
foedwater lina r up turn ui/ concurrent failure of steam
generator blouidouin iaolation valve on another loop
FJflIi£LLI,0 Region 3, Chicago, React or Construction fc Engineering
Support Branch HO/O7/O7 Ip
8007240319 Ack receipt of DOO637 interim deficiency ript ri incorrecl
ueld filler used in u&lding of safety-related pip* spool
pieces
FIOFIELLIiO Region 3, Chicago, R (factor Construction & Enginiartnl
Support Dranch 80/07/IO Ip
8007290397 Interim deficiency rept re automatic actuation function of
Westinghnuae Type W-2 auiltch Utll mill consider vendor
findings t determine any corrective actions Final rapt will
be forwarded by 801121
SHIELDS, S H public Service CD of Indiana, Inc BO/07/21 3pp
B0072B0667 Interim deficlancv rcpt re reinforcing ntsel inital lotiona
not meeting spec requirements Cauae no-t stated Engineerinj
evaluation uilll be peTformed on pertinent reinforced
cnncretH otements
SHIELDS, 3 W Public Service Co of Indiana, Inc BO/07/84 Spp
U Congressional /EI ocut 1 ve Cor reap on dene e
BOO711031O DiacusaeB concerna re DO-J investigation of alleged coverup
of conat Plaus Stop uiork order should not be lifted u/o
releaBB of final FBI rc-pt Independent engineer should be
allowed continued access to site if const resumes
FOF1D.U H Senate BO/OS/OB Ip
8007030159 Responds to BOO313, 0417 & 0508 1 trs re facility const
resumption Use of consultant to perform regular Imp
functions uould not provide addl safety assurance
AHEARHE, J F Commission BO/Oi/iib 3pp
B007H3Q3a5 Providoa five main topics of considerations re resumption of
saf eta—related const uiord. in response to B0091S rmuost
Includes verification of adequaEy of prevlaualy placed
concrete !c ratios i numbers of QA/OC perBonnel
DIRCKB. W J Office of the Executive Director For Operation!
BO/Q7/02 Spp
— aOQ725O246 flequests info re IE recommendation to allow gr*dual
resirnption of const & issues discuasod in related Comniaiion
brie f ing
DECKAISI), J Houne of Rep . Government Operations 00/03/15 3pp
DOCKET STN-30-317 MARBLE HILL NUCLEAR STrtTlDN. UNIT 3
A Application/construction stags document* It correspondence
800701Q07& FnruarilE utll revised project OA manual Contain* resolution
of IE comments from review of prevlnufi manual Project mgt
procedures I* ASME OA manual uiill be rovieuted f-or consistency
u/project OA manual U/o one 1
SHIELDS. 8 U Public Service Cn of Indiana, Inc QD/06/O4 Ip,
80D721Q09B Advises of readiness for NFtC review ti evaluation of It««*
A 1 c ,d, t< u J of anp to V Stella Q0031S Itr re graduated
revision of ordor dated 79O315
ShtlELDS.SU Public Service Co of Indiana, Inc BO/06/19 Ip.
8007140901 Confirms HOO&27 mooting uj/MD Menecor & HA Darker at site to
disicusi const related activities
KEPPLER, J 0 Region 3. Chicago. Office of the Director. 30/06/34
ip
B007230001 Forwards statement of policy re requirements to be met For
current OL appt icatlonfti as derived from NUnEO-0660 h found
in MUREO-Ofi^
E1BENHUT.DO Division oF Licensing 00/04/36 2pp
DOCKETED ITEMS
B007E30142 Notifies that licensee revised Oft program <i prerequisites
necesBaru, fOT receipt insp. under restart program Items A a
& B 3. h«V» been iflt isfactorily completed Utll is authurliod
to btgin receipt insps For Item B 4
BTELLD.V Office of Inspection d Enforcement. Office of ths
Director BO/07 /O7 5pp
F Security' medical, emergency t< fire protection plans
BOQ72B0391 Requests confirmation that divisional personnel located
on»ite would not be covered bu NUREQ-OiB4 & FEMA HEP-1
unless specific onsite emergency assignments mere involved
6HIELDB.S H. Public Service Co of Indiana, Inc BO/O7/1B 2pp
O Ad judJieatoru, correspondence
3007100096 Foruard* IE ln-;p Flopts SO-'"16/HO- 19 fc 30--i47/BO»l V pn
BO0513 Ho nctncompl idnca noted
DAVIS, A 13 Region 3: Chicago Fuel Facility t, Mntovlala Safety
Branch BO/O6/03 2pp
— 8007100099 IE Insp Repts 50-546/RO-W I. 30-547/00-19 on HO&513 No
noncompl i ante noted Major areas inspected environ
monitoring program & environ protection program
fcSSIC.T H , ttFIEKP.. H H (lesion 3, LUitagii. Off lie of th* Director
80/06/02 3pp
BOO7160169 Forwards IE Insp Ropta !)0-b46/aO 17 I* 30-547/30-17 on
000432-29,30 ?. Q513 No noncomp 1 >aiu c noted
F10FICLLl.fi Region 3, ChiLdgo, Realtor Construction ft Grig inaor i ng
Support Branch GO/Oh/lO 2pji
B007310Z43 Forward* Commission BOO337 me-morandum 6 order containino
decisions on UCS 790302 petition Far reconsideration of
7BO413 memorandum tc order UCB 771 1O4 petition sought action
re fire protection for electrical cables
EIBENHUTiD 0 DivUion of Licensing 90/06/29 B9pp
8007100295 Discusses Bave the Valley addl comments to Commissioner re
reiujaption of work at facil ity, docketed on 800514 NRC mill
review document ta determine whether addl enforcement
HCBiures are appropriate
BTEU.P, v Office of Inspection fc Enforcement, Office of the
Director BQ/Ob/St, 2pp
— BO071OO308 Notice that Save the Valleu addl commenta to Commi a sionar re
raiu-aptlan of work at facility, docketed on BOO514,uill be
tre*ted under 10CFR2 206
BTELLO.V Office of Inspection it Enforcement, Office of the
Director BO/O&/26 Ip
H. Qeneral correspondence
9QQ711OSBS Foru*rtf» response to nuastions t. comments presented at
8O03SS- public meeting Utll required to adhere to ABME code
for lafity-rslatad piping ays R&vined OA program description
•ncl W/o description
BTEtLO.V Office of Inspection S. Enforcement. Office of the
Director BQ/03/E3 epp
B007010031 Bub nits addl info arising from Sassafras Audubon Society
79O90I rtqucst for hearing re heavy faults h forwards B00610
Itr to DO Fry
8TELLO.V Office of In»psction t. Enforcement. Office of tht
Director, BO/06/16. 2pp
— B00701O046 Ack raceipt of 8O0313 reply to request for backflround info
on statement re heavy faults made in 790901 request for
hearing. Term uas inappropriate Concrete structures ulll
•xhtbit cracks which do not affect integrity
BHEHMARER.R E Office of Inspection fc Enf orcementj Office of the
Director 80/O6/IO 2pp.
— BOO701OQ33 ftesponds to BQOSOB inquiry re statement in 790901 request
for hearing on confirming suspension of const re heavy
fault* Forwards 790111 Indianapolis Star neuis article in
which statement appeared Requests any info on aubj
FREYj D B Sassafras Audubon Society BO/03/15 2pp
— 8007160479 IE Jnap Hupbs 5o-S4(i/B()-l > !« -JO-SflT/BO-l / on E10U422-2&. CIO
0513 No noncomp 1 iance notnd Major 31 «as inspocted project OA
manua \, por 9 onno I qual i f i cnt i arts & jibijtltal verificalion of
strut tural atcel actlvitici
SCKWEIDNINZ.E: , HrtniusoM.,) j , wiiLirtns,r f Rugion 3, Chicago.
Office of the Director nOJQt>/0& 9pp
BOO79aoai5 Foru-arifs IE Info Notice 80-26, "Evnl uati nn of Contractor
QA Programs " Nn urittcn rv^pcin^o Tflquirn-tf
KEPPLER.J Q Rug I on a, Chicago, Office oP Ihi? Dli-ectnT BO/06/1O
Ip
B007160187 Foruardfi IE Info Nplice BO-27, "Dpfltadjit i on of Heac tor
Coolants Pump Studi " No sprrlFit .ictinn or rosponsi'
required
KEPPLEH.J Q Region 3, Cliicagu. CJfflco of tho DiPuctor BO/Oi/H,
BOD70300a7 Ac h receipt of aOO'32S Itr informing NUC (if stops tnken to
correct violations noted in It Inep Ropts 30-946/79-03 fc
30-547/77-02, 50-546X79-03 fc S()~S47/7*;-0^1 50-5fl(,/79-Ofl !.
FIQBELLI.e Region ^. Chicago. Roe c tor Conttruct i on ft £nglne»rlnj)
Support Branch BO/Oi/13 IP
— H007Q2OQ31 Rcsnonda to NHC i tr rn violations noted In IE Insp Hepti
30-346/79-03. 50-!i17/79-OJ, SO- 31 A/ 7 9-0:1, 30-347/79-03,
SO-316/79-Ofl & flO-347/70-Ofl Corrective actions procBdtiroi
ro (1C insp have been returl ttoik to clailfu. PTOCHBE
SHIELDS. S H Public Service Co nf Indinna, Inc 00/05/HB 3pp
80O72B0631 roiuards IE Info Notice FiO-20. "Prompt Roportina o* ln'o i
Accordance W/lOCFrOO »3!u> " No luritlen rur-iiniiBO rmqiilrflil
KCPPLER.J G Hegion 3. Chicago, Office nP the Director 00/06/13
aOO7MOSOfi Reapnndi tn IE Bulletin (10-09, "HydrflnnutnT Actuator
DePicinncies " Vendor mill not utillio incorrect Bprlng matl
in facility acl-uotiirs havinn greater than 3-inch stroke No
mod needotf for equipment nu.il i f i ufit i nn or tust pirnDrami
BHIELDSrO W Publit Serwiti? Cn ut Indiana. Inc flO/06/10
Ip
B0073307O1 roruiarils IE In&p HirptB 10-rj4fc/HO-aB 5 30-347/00-23 nn
B00501-31 No noncoinpl itinco noted
FIORELLI.Q Regicn 3. Chit.igo, Hear top Construction t- Enninaflrlno
Support Branch BO/Oh/19 ^pp
8007110344 Notifies that action per 1OCFRS SOS it being taken to
consider comment* docketed on 600307 d 14 r* resumption of
conit at plant Notice of r»quest for action mill be
published in FR
STELLO* V Office of Inspection A Enforcement, Dffieo of the
Director BQ/Qb/Bi, 4pp
B007220349 Forwards summary of latest (June 1980) ni-gani lational
change. Info includes r»viaed organisation charts k provides
ov»rvi«u identifying individual changes luhich affect
overall OA program
SHIELDS, SM Public Service Co of Indiana, Inc 80/07/09
0 Inspection report*, IE Bulletins fc correspondence
Bpp
BOO72 10363 FoTuardi IE Circular SO-13. "Grid Strap Damage in
Mestinghoose Fuel Assemblies " No written response required
KEPPUER.J 0 Region 3. Chicago, Office of the Director BO/OS/HB
Ip
8007010074 Forwards IE Info Notice BO-H3, "Loss of auction to Emergency
Feodwater Pumps " No written response required
KEPPLER, 0, 0 Region 3, Chicago, Office of the Director 8O/03/29
ip.
— B0072307IO 1C Jnsp Hopta SO-50f-/fS()-f'y t, DO-34//QO-W on 1100301-31 Wo
noncnmpl lance noled Major art-as inspected iiuiifiary ?< fuel
handling blilgs t, containment
HARRISON. J J , HILLIAMS.C C. itegion 3. Chicfljo, (IPPicn of the
Director HO/Oft/lH flpp
0007020540 Forwards IE C'trruUi UO-13, "Loss of Hp.ictor Cflolflnt Pump
Cooling !< Natural Cinulotlnn Coaldotitn " No biritton rpinonso
required
K.EPPLCR. J & fteijion :i. Chlrjgo, Office of tho Diioctor QO/Oi/HO
Ip
3007170510 rormarJs IE Circular BO-11, "RadioacUvo Conlnmi nation of
Plant DeminurnlliEd Mater fig 5 <- flusult.int Interndl
Contaminat inn of Pcrstiniio! " No written rDf-ponse T«tiuireii
HEPPLER, J Q Region 3. Chicago, OfPicB of the Director OO/fl/j/21
IP
B00733033E) rorunrds IE Duiletin [30-16. "Potnntinl
Rosemount Inc NodcU 1131 !< i 1 !S2 ITunsiirc Tram
W/EUber A at D Dutnut Coues " Wrttton ri>tpan«i
IE Circular 00-16 alao cncl No uir-ttton resjinnse
HEPPLER. ,) 0 Hcnmn 3. Chicago, flf-Plco of tho D
130
DOCKETED ITEMS
HD0723O23B Responds to IE Bulletin BO-OS. "Eiarn of Containment Llnor
Penetration Welds " Pene traticns <ji\ 1 1 be installed per ASME
code Rad ingiraph ic e i animation? of Types 1 t, 2 flued head
penetjrat i DHE mill be performed
BHIELDS.S W Public Service Co of Indiana. Inc HO/07/O3 3pp
O00733OO'73 Responds to IE Bulletin SO-O5. "Vacuum Condition Resulting
in Damage to Chemical Vol Control Sys (CVCS) Holdup Tanks "
Design features t proper operating procedure's ensure
adeo.uat-& protection against vacuum damage
SHIELDH..S W Public Bervico Co of Indiana. Inc 90/07/07 2pp
B007S800B3 Forwards restart program ui/NRC hold points Based nn insp
findings, which confirm info reported in BOQ&27 I tr, cone 1 utles
Items f\ a & D 3 of restart program meet fl-A requirements
Pro gram accep tall le
STELLO.V Office of Inspection ti Enforcement. Office of the
Director BO/O7/O7 4pp
S Repot
LERs (t related correspondence
BQQ71OO229 Interim deficiency rept re certified matl test repts for
un>l<} filler matl AEME ha-s not provided cotfe interpretation
of r equipments re repts to date, but util enpects to File
final r*pt on or before BOlQul
6H1ELDS,S W Public Service CD of Indiana, Inc 80/06/37 Ip
DOCKET 30-34? GREENE COUNTY NUCLEAR POWER PLANT
ft Application/construction stage document* tt correspondence
BOO733Q001 Forwards statement of policy re requirements to bn net for
current OL opp 1 icationa, as derived from NUREQ-066O ti found
in NUREQ-06'?'!
EISENHUT.D Q Division of Licensing HO/Ofa/26 2pp
DOCKET BTN-30-5H3 PHIPP8 BEND NUCLEAR PLANT, UNIT 1
A Application/construction stage documents 6 correspondence
BO07O1O22B Advises of reorgant i at ion of Oft of Nuclear Reactor
Regulation, effective BOOa2B Mgt of all licensing matters for
facilities has been assigned tn D Bcaletti Orgnnliatlanal
description encl
TEDEBCQi R L Assistant Director for Licensing 30/06/13 lOpp
SO07230001 Foruiards statement of policy re requirements to be net for
current OL appl Ications, as derived from NUREQ-O66O & found
in KUREQ-Ob74
EIBENHUT. D 0 Division of Licensing BO/06/Bfa 2pp
O Adjudicatorg correspondence
B0073IO031 Act receipt of BO 0602 i nteT) m de Fie 1 encu rffpt re problem in
operation of ce-ntilfuga] charging pumps -at min allowable
flout rate
FldflELLI.Q Region 3. Chicago. Floactor Construction ti Engineering
Support Branch SD/07/O3 Ip
6007310243 Forwards Commisiion 800327 memorandum Ic order containing
decisions on UC9 7BO302 petition for reconsideration of
7B0413 mumorantlum tt order UC9 771104 petition souaht action
TO fire protection for electrical cablai
E1GENHUT.D Q Division of Licensing BO/O6/2S S9pp
9007S 10035 Ack receipt of B00425 interim deflciencij rvpt re certified
natl test refits for uield filter matl
FJOnELLI.O neolon 3. Chicago. Reactor Construction b Enjlneef Ing
Support Branch 80/07/03 Ip
8007310031 Ack reciepl of B0042B Final deficiencij rept re concrete
auiikiary bldg stab
FJOHELLIfQ Region 3. Chicago. Flea c tor Construction A Engineering
Support Branch 80/07/03 Ip
H Genera! correspondence
8O071GD4S1 Responds to encl fl0023B 1 tr to Prosittant Carter re nuclear
power plants Radiation exposure considered as part of EIS
before CP issued Everg effort made to protect public health
b safety at all nuclear plants
DENTON.H R Office of Nuclear Reactor Regulation. Director
ao/os/os app
8007210054 Ack receipt off B00425 Final deficiency rept ra joints in
safety-relate-!! structural steel
FIOHELL1.0 Region 3, Chicago. Reactnr Construction & Enjtneerlnj
Support Branch 80^07X03 Ip
aO073306!5 Ack receipt of B00425 final deficiency rept re use of
none ode mat] In certain c ode. C-a tagory I component tupaorts.
FIDRELLIj O Region 3, Chicago, Reactor Construction ti Engineering
Support Branch BO/0-7/03 Ip
9QQ71BOS36 Ack recelat of 300313 final deficiency rept rt) failure to
meet PSftR basis secondary cooling flou rate riiie to main
feed water 1 in« rupture u/c on cur rent failure of steam
generator Moigdoiun isolation valve on. another loop.
FIGRELLIiB Region 3. Chicago, Reactor Construction t. Engineering
Sup fort D ranch BO/O7/07 Ip
Q Inspection reports. IE Bulletins & correspondence
BO 073-4 0089 Poniards IE Info Notice 80-3O. "Loss of Decay H*at Removal
Capability at Davis-Demo Unit 1 While in Refueling Mode "
No response required
O'REILLYjJ P Region S, Atlanta. Office of thn Director HO/03/Ofl
3pp
B00714047'7 Forwards IE Bulletin 80-13. "Cracking in Cor» Spray
Spargers " No uiritton response required.
0'HEILLVjJ P Region 2. Atlanta, Office of the Dir.ctor BO/09/18
B007010SHS Forwards IE Info Notice 80-23, "Lou of Suction to Emergency
Feeduater Pumps " No written response required
O'REILLY, J P Region 3. Atlanta, Office of the Director flO/OS/29.
BQQ734Q3it Ack receipt of 800637 interim deficiency rapt re incorrect
ue 1 d filler u&ed in ueldinj of safety— re la ted pipe spool
pi eceSv
FIORELLI.Q Region 3. Chicago, Reactor Construction & Engineering
Support Branc?i 80/O7/1O Ip
0007220029 Fnruards IE Info Notice 80-36, "Evaluation of Contractor
QA Programs " Ho written response required
O'REILLY, J P Region 2, Atlanta, Office of the Director 80/04/10
3pp
0007250397 Interim deficient^ rept re automatic actuation function -of
West Ingh-ouse Type U-2 switch Util uii 1 1 consider vendor
findings t< determine any torrot t IVB actions Final rept ulll
bo forwarded by B01I21
BHIELDg.S U Public flervica Co of Indiana, Inc BQ/07/al Hpp
B007H0301 Forwardi IE Bulletin BO-14, "Degradation of BWR Seram
Discharge vol Capability " No uric-ten response required.
0-neiLLY.JP Region a, Atlanta, Office of the Director SO/OA/ia.
Ip.
8007580667 Interim deficiency rept re reinforcing steel installations
not meetinfl spet rpquireraentE Cause not stated Englnearing
evaluation will be performed nn pertinent reinforced
concrete elements
SHIELDS.S W Public Bar vice Co of Indiana. Inc, BO/07/24, 2pp.
i ConjroBslonal/Ejecut ive Correspondence
a00711O3I8 Diai: us tec concerns re DOJ investigation of alleged covorup
of const flaiiis atop.tiork order should not be lifted ta/o
release of Final FDl rapt Independent engineer srtoulrf be
allowed continuod access tc- site if canst resuma*
FORD, M H Senate BO/OS/OB Ip
B0070BO159 Responds to 000313,0417 h 0508 Itrs re facility const
resumpti-on Use oF consultant to pftrfnrm regular fnsp
functions umuld not provide- addl tafety aaeurarca
AHEARNE.J F Commission flO/floYta 3pp,
6007230394 Foruards IE Info Notice 8O-2Q. "Prompt Reportlno o* In'o in
Accordance U/10CFRSO 55(«) " No written response required
O'REILLV.J P Region S, Atlanta, Office of the Director 00/06/13.
3pp
600702049*? Forwards response to IE Qullutin BO -09 tranimitted by
JP O'Reilly 80Q417 Itr Final rapt for Hartsvllle fc Phlpp»
Bend plants ulll be sent on or before Q01D17
MILLS, L M Tennessee Valley Authority BO/06/16 2pp
BO07170S59 Responds to TV Abbotlello 800606 teleon re IE Investigation
Repts 50-353/BO-05 !< SO-354/HO-04 Error In Paragraphs a Si 3
of Attachment A of subj repka has bee'n corrected, chatiglnn
assistant const engineer to assistant const superintendent.
ALDER6DN.C E Region 2, Atlanta, Office of the Director. 80/06/19
DOCKETED ITEMS
331
-~eOQTI7O367 Forward* IE Investigation HeptJ 30-533/BO-05 b 50-394/BO-04
on 8Q022Q-22. No nonconpliance notid
LOMOiF.J Region 2, Atlanta. Office of the Director 8O/05/29
— 8007I70W4 IE Invevtlotjtlon Rept* 50-993/60-05 b 3O-554/BO-04 from Inap
on 800220-22. Major area* inspected allegation that us Id ing
OC inspector was Instructed bg supervisor to aitrtt
poraiBBlble Maid baad widths,
LONG, F J , MARSH, P J Region a, Atlanta, Office of the Director
8O/O9/23 lOpp
— BO0711032B First interim deficiency rept on RoEBtnount Model 1152
pressure transmitter defects During testing, OE found
ambiguous output to over & underpressure conditions Hevisu
to determine number of transmitters DTI location underway
* Tennessee Valley Authority 80/07/03 Ip
BQ0732045Q First interim deficiency rep t re reactor p.ressure vessel
shroud head & moisture separator assembly fire Reactor
pressure vessel assembly uas initially Jiifdroblos ted u/
deminoraliiei) mater Assembly mill be cleaned thoroughly
« Tennessee Valley Authority GO/07/14 3pp
R007O2O371 Forward* IE Circular 80-19, "Los* of Reactor Coolant Pump
Cooling ti Natural Circulation Cooldown " No uritten response
rnqulrad
O'REILLY. J P. Ration 3, Atlanta. Office of the Director SO/Oi/EO
Ip.
0007170O7O Forward* IE Circular BO-14, "Radioactive Con t ami nation of
Plant Danineraliied Water Bgt & Retultant Intirnal
Contamination of Personnel " Mo uritten response required.
O'RCILLY, J P Region H, Atl*nta, Office of the Director 00/06/24
IP
BOD7a3O293 Forward! IE Bulletin 80-16, "Potential Nisipp lication of
Ro»»mount Inc Model* 1131 h 1192 Pre**ure Transmitter*
H/Elttt>r A or D Output Cod** " Written response required
IE Circular SO- It also encl No written response required
0 'RE ILLY. J P Ration 2, Atlanta, Office of the Director 80/06/27
DOCKET STN-30-S54 PHIPPS BEND NUCLEAR PLANT. UNIT 3
A App 1 ication/cotiitruc tion stage documents & correspond once
8007O1022B Advises oF reorganliatlon of Ofc of Nuclear Reactor
Regulation, effec live B00439 Mgt of all licensing matters for
facilities has been assigned to D Staletti Qrg-ani lational
description enc 1
TEDE3CO, R L Assistant Director for Licensing BO/06/ 13 lOpp
8007230001 Forwards statement of policy re requirements to be met for
current DL appl Ications. as derived from NUREO-0660 & found
In NUREG-Q694
E1SENHUT.D 0 Division of Licensing 80/06/26 3pp
0 Adjudlcatory correspondence
Riapondi to IE Bulletin 79-2S, "Possible Malfunction of
NAHCO Hadtl EA1BO Li nit SMltchis at Elevated Tamps "
Invaitiqatlon* *how no NAMCO EA1BO switch** an installed or
planned for Installation.
MILLS. L. M. T«nn***«e Valleu Authority. GO/07/O1, Ip.
B007310Z43 Foruard-i Commission 300537 memorandum t, order containing
decisions on UC3 7B0902 petition for reconsideration of
700413 memorandum & order UCB 771104 petition souoht action
re fire protection for electrical cables
EISENHUT. D 0 Division of Licensing 80/06/35 97pp
O0071BO1S9 Ack. rHcelnt of BOO* 19 Itr informing NRC of tt*pt takvn to
corract violation noted In IE Inip Repts SO-SSa/BO-OS &
50-334/80-07.
MURPHViC.E/ Region S, Atlanta. Reactor Construction d Englniarinn
Support Branch BO/07/02, Ip.
— 60O7180199 Forward* IE In*p Repts 30-993/60-08 b SO-994/QO-07 on
EKW907-O9 * notic* of violation
NURPHV.C E Rtglon 9, Atlanta, Reactor Conitruction b Englci«erlrfg
Support Branch, BO/O3/2B Spp
— B0071B02SO Notiet of violation from insp on BOO 307- 09
• Rtjion 2, Atlanta? Rtactor Construction & Engineering Support
Branch BO/09/21, tp
-^8007180234 IE Inip Rept* 50-533/BO-OB fc 9O-994/SO-07 on 800907-09.
MoncoBpltanc* notad- Inadequate concrete batch plant Insp
LEHAHAN, J J Region 2, Atlanta, Offict of the Director
CONLON, T. E. Riglon S> Atlanta. Reactor Construction b Englnntrlng
Support Branch BO/O3/S1. 5pp.
BOO73HU19 Ri-ipondi to IE Bullttin 80-OBj "Elimination of Containment
Penetration 'Meld*. " Rtiulti of Investigation encl
MILLS, UM Tenntna* V«ll*ij Authoritu eo/07/07, SPP
S, Riportable occurrincei. LER* h related correspondence
H Oaneral correspondence
B0071B0181 Responds to encl B0023B Itr to President Carter re nuclear
power plants Radiation eiposure considered as part of EI3
before CP issued Every effort made to protect public health
t safety at all nucle-ar plants
DENTC-NiH R Office af Nuclear Reactor Regulation, Director
BO/09/09 2pp
Q Inspection reports, IE Bulletins ti correspondence
B0072100B9 Foruard* IE Info Notice BO-20, "Lng% of Decaij Heat Removal
Capabiliby at Davis-Besse Unit 1 While in Refueling Mode "
No response renuired
O'REILLY, J P Region S, Atlanta, Office of the Director 80/03/00
B007M0179 Forwards IE Bulletin 80-13. "Cracking in Core Spray
Spargers " No written response required
O'REILLY.J P Region 2, AtSanta, Office of the Director BO/O5/13
8007010223 Forwards IE Info Notice 80-33, "Loss of Suction to Emergency
Feeduater Pumps " No written response required
O'REILLYiO P Region 3, Atlanta, Office of the Dimeter 80/05/29
B00717O23A Part SI rcpt r» potential defect in air conditioning unlti
In fBcilitie*. Oetailod info will be provided to as*l*t
dBtarninatton of significant safety haiard
OIHOUX-E J Carrier Corp Carrier Air Conditioning Dlv BO/06/17
3pp.
BQ0717O247 Part Hi rept of potentially dtfectlvn Rosamount, Inc
tranm»ltter In control *u* of air conditioning onlts Info 1*
provided to a*vl*t in determination of flgnlflcance at
i*f>tg haiard
OIROUXiE. J Carrier Corp Carrier Air Conditioning Div BO/O6/2O
J»pp.
BO0710O293 Fifth interim deflclencv rept re high prassur* care *pr»y
di*t»l generator auitchgear wiring discrepancies OE ha« not
provided to utll revised/corrected drawings or replacement
part* to complete action* Final rept to be filed bu B01001
MILLS, L M Tennessee Valley Authority BO/06/27 Ip
0007110320 Forward* first interim deficiency rept on Raiamount Model
1192 prenura transmitter defects Initially reported 800&O3
Final rept will be *ubnitted on or before B00917,
HILLS.L.M, Tenneis»e Valley Authority 80/07/O2. Ip
BOO? 320029 Foruiards IE Info Notice 80-36. "Evaluation of Contractor
QA Programs " No written response required
Q'REILLY.J P Region 2, Atlanta. Office- of the Director QO/OA/10
3pp.
B007140301 Forwards IE Bulletin 00-14, "Degradation of BUR Scram
Discharge Vol Tupabllity " Mo written response required
O'REILLY.J P Region 3, Atlanta, Office of the Director BO/OA/12
B0072903B4 Forwards IE Infp Notice SO-2B, "Prompt Reporting of Info in
Accordance W/10CFR50 !15<e) *' No written response required
O'REILLY.J P Region 3, Atlanta, Office of the Director flO/OA/13
3fi p
BOQ703Q497 Forwards res.ponse to IE Bulletin BO-O9 transmitted bi;
JP O'Reinu B00417 Itr Final rept for Hartavitla t, Phippi
Bend plants uill be sent on or before 801017
MILLS, L M Tennessee Valley Authority BD/0<b/16 3pp
B007170399 Responds to TV Abbatiello 800606 telcon re IE Investigation
Repts 50-553/90-05 & 50-534/90-04 Error in Paragraphs 2 t 3
at Attachment A of subj rupts lias been corrected, changing
asiistant const engineer to assistant canst superintendent
ALDERBON.C E Region 3, Atlanta, Office of the Director. BO/0.&/1?-
O0717O567 Forwards IE Inves tigat ion Iftepts 5O-S53/BO-OS g. 50~SS4/ao-Oq
on BQO22Q-32 Ha none ornpl i ante noted
LONB.F O Region 2. Atlanta, Office of the Director SO/05/39
2pp
BO071103ZO Forward* first interim deficiency r*pt on Roseoount
1193 pressure transmitter defects initially reported SOOAO3
Final rapt will be submitted on nr before 800917
HILLS, L M Tennessee Valley Authority BO/07/02 Ip,
007170534 IE Investigation Repts 5Q-553/BQ-Q5 ft 30-594/80-04 from imp
on BOO230-S3 Major areas inspected allegation that welding
QC inspector uias instructed by supervisor to exceed
permissible meld bead (Jiriths
LONG, F J . MARSH, R J Region 2. Atlanta. Office- of the Director
BO/O5/2H lOpp
7020391 Forwards IE Circular BO-15. "Lo»s of Reactor Coolant Pump
mlln-g l< Natural Circulation Cooldniun " No written response
eq,ulreil
'RE1LLV, J P Rooidn 2, Atlanta. Office of the Director BO/06/2Q
— 3007110333 First Interim deficiency r*pt on ROB amount Model lisa
pressure transmitter defects During testinpiQE found
ambiguous output to ov-er fc underpressure condition* ftevlm
to determine number of transmit tars on location underway
* Tennessee Valley Authority GO/ 07 /OS Ip
eo 072 204 SO First interim deficiency rept rn reactor pmcaura vassal
nliroud head b moisture separator a « numbly fire Reactor
pressure vessel aasemblv use initially hydroblasted u/
deminora 1 lied water Assembly uill be cleaned thoroughly
» Tennessee Valley Authority BO/07/14 3pp
M7QQ70 Forwards IE Circular BO-lfl, ''Radioactive Contamination of
(•ant Deminaral lied Mater Sys & Resultant Internal
intnmi nation of Personnel " No written response required
'REILLV, J P Region 2, Atlanta, Office of the Director BO/QV34
'S303S3 Forwards IE Bulletin 60-16, "Potential Misapplication of
isemount Inc Models 1151 & 11S3 Pres&ure Transmitters
'Either A or D nutpuC Code-s " Written response rcqiliretf.
Circular SD-I& also encl No written response requifed
REILLY.J P Region 2, Atlanta. Office- of the Director BO/O4/27
'520236 Responds to IE Bulletin 79-23, "Possible Malfunction of
MCO Model EA1BO Limit Switches at Elevated Tcmpa "
vest igat ions shoui no NAMCO EAI8O 3uitchC5 are installeil nr
annetf for installation
LI_a,L M TonneusBB Valley Authority 80/Q7/QI Ip
1G01B9 Act receipt of 900619 Itr informing NRt af> steps taken to
rrect violation noted in IE Insp Repta BO-533/HO-oB tt
-35fl/BO-O7
BPHY.C E Region S, Atlonta, Reactor COSIB true 1 i on t, Engineerina
pport Branch BO/O7./G3 Ip
071BO199 Foryarda IE Insp Repts SO-953/BO-t>a !, 50-3B4/E1O-07 on
30O507-09 & notice of violation
1URPtlY,C E Region 2. Atlanta. Reactor Cnniti t<c tion & Engineering
Support Dianch EJO/O3/20 2pp
DOCKET STN-30-556 BLACK FOX STATION, UNIT 1
A Application/construction stage document* h eorrnBpondtfne*
BCH3i30O36B Advii^a that llBt of mat! * to be ut-til in con»t of fir* stops
ti cfiarac teristi ci re f lamina bi li ty & fir* retordflncg will b*
provldad 1 yr subsequent to receipt of CP
(WENCH, S U Public BerVlc* Co of .Oklahoma SQ/06/20 3pp,
BOO72300O1 Foruards statenont of pollcg r* r*qUlr>m*nt<i to be nvt far
current DL applica tlonsi as derived tram NUHE0-0660 & found
in Nl)nEO~Of>94
EI8ENHUT, D 0 Division of Licensing BO/06/26 2pp
O Adjudicatorg cnrretpondence-
37180HSO Notice of vinlatinn From map on
Reginn 2. Atlanta. Reactor Cons true ti an •!< Fngitioerlng Support
Iranch 00/O3/21 Ip.
QOO7020613 Motion to intervene as Interested stat* in Cai*
before US Court of Appeals for DC Circuit NRG regulation!
grant states legal right to intervene at appeal stag*
Certificate of Bvc enel Related corre*pondonc*
BEfiQERiR F , CAHTURIOHT.J E Oklahoma, Statr of BO/Oi/24 lOpp
8007310243 ForuaridB Commissioti S00327 memorondum b ordar containing
decisions on UC8 7Q09Q2 petition for reconsideration of
7B0413 mBmorandum & order UC3 771104 petition tought action
re fire prelection for electrical cables
EISENHUT.DO Division of LiccnsinD BO/Ofi/aS B9pp
BOO7310153 NoticBB of JO Thomas & CS tlogerc ul thdraiual b Rf D«rg*r
appearance in proceeding. Cortificato of Svc »ncl
THOMAS.J 0 , RHOERB, C S . DEROER. R F Oklahoma. Btat* of 60/06/3O
7pp
)71BOa34 IE Insp Repts 30-553/80-08 & 5 0-55-1 /fiO-07 on B00507-09,
Jon camp] lance noted inadequate concrete batch plant Insp
ENAHAN<J J Region B. Atlanta. Office of the Director
IDNLON. T E Flogion 2. Atlanta, Reactor Consti nction !< Engineering
up fart PrancJi BD705/21 5pp
>E3Oa!5 Reiponda to IE Bulletin HO-OB, "EiamlnnCion of Containment
iBtratlon Melds " Res-nits of Invast igati on encl
LS,L M Tennessee Vallpij Authorltu 80/07707 9p p
'portable nccurronce s, LEFis t< related cor respnndcnc
Part 21 ropt re- potential defect in air conditioning units
facilities Detailed inPo will be provided to assist
erminotian of significant safetij haiard
OUXiE J Carrier Corp Carrier Air Conditioning Div 60/06/17
6OO7170369 Foruarda BH ManAUor of Accident Tasli F-ovce 711OO3 HRMO.
designated Number 32, re to Icon u/P Drag of OE. in r**poni* to
B0070? Itr
PATON, U D Hearing Branch 4 BO/07/13 Ip
— S007170371 Advises of telcon u/R Salvatori of Mutlnghous* ra Cln*«at
3-8 accident! & prababl* causes Official u»» only.
HANAUER.S H Atomic Energy ComtnisBiDn 71/10/03 Ip
H General correspondence
BOO 703 00 13 Responds to BO QUO 3 Itr re emergency planning for facilities
Requirements for emergency planning1 are being revived In
respona* to recommendations of NRC/EPA Joint Task Fore*
on Emergency Planning It TMI Lessons- Learned Task Forces.
CRIMES, B K Emergency Preparedness Program Office. fl 0/06/23, Sff
90375 Foruards final deficiency rept re Incorrect root face an
wed caduiald sleeves
LSfL M Tennessee Vallog Authority HO/O'o/ig IP
70247 Part 31 rept of potentially defective Rosemount. Ine
nsmltter in control sys of air conditioning unit& Info IB
vided to aESiist In determination of significance as
frtg haiard
1UX.E J Carrier Corp Carrier Air Conditioning Div BO/06/SO
00332 Fifth interim dePlclEnca rept re high presaure tors spray
set generator aultchgear miring discrepancies OE has not
vided to util rcvised/t orrec ted drawings- or peplacement
ts to complete actions Final rppt to be filed btj BOI001
U3, L H Tennessee Valley Authority* 00/06/37 Ip
— B007O30019 Dppo-iBE const of Facilltiet until adequate *«t*rg*nc|j
response plan can be developed Recommends r*sponolbi 1 ity for
emergency response plan be placed u/ Independent consulting
svc.not State nf OK
MALONEi K Affiliation Unlmouin 80/08/03 Hpp
0 Inspection reports, IE Bulletins tr carrespondence
B007S2O1IO Forwards IE Info Notice 80-2i, "Evaluation of Contractor
QA Programs " No written response required
SEVFFIITiK V Region 4. Dallas, Office of the Director 80/06/10
IP
8OO7290O7S Forwards IE Info Notice SO-23. "Prompt Reporting of Info in
Accordancn W/10CFR90 35(e> " No written response required
SEYFRIT.K. V Region 4, Dallas, Office of the Director 80/06/13
Ip
DOCKETED ITEMS
333
DOCKET STN-50-997 BLACK FOX STATION, UNIT 3
A Application/construction stage documents t, correspondence
B0072300O1 Forwards a tat omen t of policy re requirements to be met fur
currant OL applications, as derived from NUREG-0660 t< found
in NUREQ-Q694
EISENHUT, D 0 Division at Licensing BO/06/26 2pp
F. Security! medical, emergency & fire protection plans
0OO&3OO36G Advisss that lilt of matls to bo used In const of fire stops
tt characteristics r« f lanmabllitu. t fire reterdancy will be
provided 1 yr subsequent to receipt of CP
H Public Service Co of Oklahoma BO/06/HO Spp
0 Adjudlcatory correspondence
B007080&13 Motion to Intervene as interested state In Case BO- 1566
bafor* US Court of Appeals for DC Circuit NRC regulations
grant *tates legal right to intervene at appeal stage
Certificate of Svc encl. Related correspondence
' BEROER.RF.. CARTHfllOHT, J E Oklahoma, State of BO/ 06/24 lOpp
BOO 73*0243 Forward! Commission BOOS37 memorandum & order containing
OclBion* on 1KB 7BD3O2 petition for reconsideration of
78O413 aoaorandum tc order UCS 771104 petition sought action
Tt tiro protection for electrical cables
EI8ENHUT.D 6 Division of Llcanilng BO/06/35 Bvpp
B007310193 Notices of JO Thomas & CS Rogers withdrawal b RF Berger
appaaranca in proceeding Certificate of Svc encl
THOMAS. JO, , RDOERSiC.S, , BEROER.RF Oklahoma, State of BO/O6/50
7pp.
6007 170369 Forwards BH Hanauar of Accident Task Force 711009 memo,
daiignatad Number S2, re telcon u/P Bray of OE, In response to
B00709 Itr.
PATQN,H.0 Hearlno Branch 4 BO/07/13 Ip
— 9007170371 Advises of tvlcon u/R Salvatorl of VJestinghouse n Classes
2-B accident* fc probable causes Official USB only
HANAUER.B.H. Atomic Energg Commission 71/10/05 Ip
DOCKET STN-50-Sdft VFL LOW TRtCK M'PCLCt.H PLANT UNIT 1
A Appl icatiun/coiisti uc 1 1 mi ^taijp iloupm&nts !( c arrespond anca
Q007310S37 Confirrai 900701 tPlcDn IP placement af oarthfill In ERCU
spray pond Concurs in rpsumji ti mi of earthfill plaLementi
based on find! rept in util 800711 Itr
O'REILLY. J P Region 2, Atlanta. Office of the Director 90/06/16
IP
B0072300O1 rnruama stoteroen
current OL app 1 1 cat lona, as
in NUREO-061?*
EISENHUT. D 0 Division of
f pniicij Tf requirements to be met for
ivod frnm NUREG-0660 k found
ilng
3pp
O Adjudicatory correspondence
B007310343 Foruiarda Commission 000137 mamorflndum !< order containtno
decisions on UCS 7B0302 petition for reconsideration of
700413 memorandum & order UCB 771104 petition sought action
re fire protection for eloctrical cables
E1SENHUT.D 0 Division of Licensing BO/06/25 B9pp
H Oeneral correspondence
B007300013 fiespondi to 79040S Itr re nuclear pouier State of IL has
seven nuclear power plants Reasons for use of nuclear power
plants in IL listed in encl eicerpt from util annual rupt
President 771207 statement re Kcmpny Commission Rcpt encl
DENTQN.H I) Office of Nuclear Reactor Regulation, Director
BO/Ob/26 2Spp
8007220027 Responds to DO Jour (fan GO 032 B Itr to J Schleslnger
Regulations require that extensive studies be performed to
show that proposed plants will not endanger health & safety
DENTDN, H R Office of Nuclear Reactor Regulation. Director
SO/07/01 Spp
-8007220030 Forwards DO Jouvdan B0033B Itr for .consideration
KENDRICK.H Energy, Dept of 90/06/03 3pp
Q Inspection reports, IE Bulletins t, corresponcle-nce
H Ofn*ral corrtipondanca
B007030013 Responds to BOO903 Itr re emergency planning for facilities
Requirements for emergency planning are baing revised in
raiponi* to reconwiandatloni of NRC/EPA Joint Task Force
on EMergancu Planning & TNI Lessons Learned rash Forces
. K. Energencu Priparednetti Program Office BO/06/33 Spp
— BO07O3OO17 apposes const of facllitiet until adequate emergency
rcipaniB plan can be developed Recommends responsibility for
emergency response plan be placed u/lndrpendent consulting
tvcinot State of OK
HALOfC, K Affiliation Unknaun BO/05/03 2pp
0 Inipnttion reportii IE Bulletins J< correspondence
BOO?aa011B Forward* IE Info Notice 80-2d, "Evaluation of Contractor
OA Program* " No uplttvn response required
BEYFRIT, K V Region 4. Dallas, Dfflce of the Director BO/06/10
3007340089 Forwards IE Info Notice BO-30. "Loss of Decay Hoat Removal
Capability at Davis-Qesne Unit 1 While in Refueling Hod« "
No response required
O'REILLY, J P Reglnn 3, Atlanta, Office of the Director BO/OS/03
3pp
00072104BB Foruiards IE Circular BO-13, "Grid Strap Damafla in
Uestlnghousc Fuel Assemblies " No uirttten response required
O'REILLYiJ P Region 2, Atlanta, Office of the Director BO/05/29
8007010225 Forwards IE Info Notice BO-23. "Loss of Suction to Emergency
Feeduoter Pumps " No written response required
O'REILLYrJ P Region B, Atlanta, Office of the Director 80/05/29
IP
B0071B0447 Foruiar-ds IE Insp Repts SO-366/BO-OB Si 5D--i67/BO-OB on
600913-16 No noncomp] lance noted
MURPHY, C E Region S, Atlanta, Reactor Construction !> Engineering
Support Branch BO/O4/05 2pp
8007290075 Forwards IE Info NoticB SO-2B, "Prompt Reportino of Info In
Accordance W/10CFRSO 99(a) " No urittln response required
flEVFRlT.K. V. Regiun 4, Dallas, Office of the Director 80/06/13
--B00715045S IE Insp Ropts SO-566/BO-OB t. 50-567VfiO-08 on 800313-16 No
noncompl ianco noted Major areas inspected licensee
idontified items, insp follouiup i tern, warehouse storage &
observation of safety-related concrete activities
THOMAS. M Region S, Atlanta, Office of the Director
CANTRELL.F B Region H. Atlanta, Reactor Construction &
Engineering Support Branch BO/06/04 4pp
DOCKET 8TN-90-541 B-BAH-203
H Oanaral correspond ance
BO072B0149 Ach receipt of essay on "E<cellanca in Operation* " Commends
attttud* touard uork on nuclear power
DENTONiH R Dfflce of Nucleir RDBCtor R.gulatipn. Director
BO/07/14 Ip,
B007220029 Forwards IE Info Notice BO-26, "Evaluation of Contractor
QA Programs " No written response required
O'REILLY.J P Region 3. Atlanta, Office of the Director BO/06/10
3pp
B0071602B7 Forwards IE Info Notice BO-27, "Degradation oF Reactor
Coolant Pump Studs " No specific action or response
required
O'REILLY, J P Region 3, Atlanta, Office oF tho Director BO/
ip
B0072503B4 Forwards IE Into Notice BO-2Q, "Prompt Report
Accordance U/IQCFR50 55(cl " No written renponsc requi
O'REIULY.J P Region 2, Atlanta, QffUe of the Direct
3pp
334
DOCKETED ITEMS
00070203?! FoiuMrifs IE CirruUn HO-l'J, Lti«i- of Reactor Coolant Pump
Con 1 uig It Nrfturiil '" } T r i*l*i t kfhr* ^oaldtiujn " PJo written response
O'FIEILLY. J P
IP
B007H90422 F
Atlanta, Offirt' (if the Director 80/06/30
MUflPHV. C E RH
Support Hidiich
Ifc In<-,p
Pmpliann;
bd- 'J66/8O-O9 !„ riO-*Jfi7/BO-019 nn
Hi-aitor Construction !r Engtneerinn
— 90072.90432 IE Insp Rtpts 50-5667(10-0"? '. SO-SfcV/BO-O1) on 900602-06
No nonccmp 1 larce noted Major areas Inspected stee!
a true tur &5 fi "iiipijoits in rontfl ifimen t me] J ing. welding matl
control j uieldBT qualification R procedures
HERDT,A R (legion 3, Atlanta- Reactor Construction b Engineering
Support Branch CROHLEY, B R Region 2, Atlanta, Office of the
Director 00/06X20 6pp
BOO717OO7O Forwards IE Circular BO-lfl. "Radioactive Contamination of
Plant Doralnersl 1 led Wator By s & Resultant Internal
Contamination of Personnel " No written irspons* required
O'REILLY. J1 P fl&oion a, Atlanta, Office of the Director 00/06/34
«P
BOQ723&253 Forwards IE Bulletin BO-lfa, "Potential Hi sapp 1 ica t i on nf
Rosflmnunt InL Models 1151 fc 1152 Pressure Transmitters
U/Elther A or P Output Codes " Written response required
IE Circular BO-li also ent 1 No written response rpD.uiT&il
O'REILLY. J P Region a. Atlanta, Office of the Director BO/06/27
aOO721OO3£i Forwards response to IE Bulletin BO-OB re-eiaminatl On of
containment liner penetration welds P-enetratt ons at
Sequoi/ah, Wa tts Bar & Bsllefonte contain flued heart design
Design for Yell-nu Creek not vet completed
MILLS, L M Tennessee Valley Authority BO/O7/OB Sp p
S fteportable octurrencei, LERa & related correspondent B
8OD71&O473 Forwards seconJ interim defl-clcntij rept re cnnit QA audit
Next rept mill be sutimittpil t.(j BOQE32O M/o encl
MILLS, L M Tennessee VaUeu AuthoritM SO/O7/0? lp
BOO7230355 Part B\ rept re Driitol stru-ctur;)! steel Praming for control
bids Oeiuorl of fillet -melds is being performed! Neib rept
will be submitted tiy SQOO15
HILLS, L M TenHEftsee Valley Authority BO/O7/O9 3ji p
OOO7I70342 Forwards Fin.ll deficlen
In ERCW apraij pond
HILLS. L M Tennessee Valley Authority
pt re placement o( carthfill
BO/07/IO lp
— a00717O3flfl Final deficiency rept re platemetit at tarthfill in ERCW
apraij pond Qft nifdil revealeJ eight items of noncomp 1 iancs re
placement & insp of earthfill Laborers mill tie assigned to
remove all visible unsuitable* mat) during Pill placement
* Tennesseo Valtay Authority 80/07/10 Ipp
B007 170356 Forwards final deficiency rept re canst QA audit
MILLS, L M Tennessee Valley Auttinrtty 8O/07/1O lp
— 3007170380 Final defaclency ropt re const OA audit Concrete placumont
evaluated I< found ae c ep tab 1 p Itispeitors instructed in
requirements of general const spec
* Tennessee Valley Authority 90/07/10 tp
BOO71SOii59 Forwards revised final d e Pic i ency re-pt ra placffmnnt of
eartTiFill in es^tntial raui cooling mater spraij pond
MILLS- L M Tennessee Valley Authority SO/07/11 lp
— 6007190663 Revised final deficiency rept re placement of aarthflll In
esie<ntlBl raw coaling water spray pond Insufficiently
compacted matl uai removed !i replacement fill recompile ted
Util uitll use penetrometer tests for Fill operations
» Tennessee Valley Authority 90/O7/1I, flpp
DOCKET STN-SO-5o7 YELLOW CREEK NUCLEAR PLANT, UMIT Z
A App 1 i cat! on/cons truet i an stage documents fc corr* ipontftnce
800731O337 Confirms BO07O1 telcon rp (ilatement of ••rthfill in ERCW
spray pond Concurs In TeBUmption oC earth fill plicaffltnti
based on final rept in util E30D711 Itr
O'REILLY. J P Region S. Atlantn, Office of the Dir*ttor 90/06/1 i,
aOO723O001 Forufarrts 'tatemant of policy re requirements to be mat For
current OL an p 1 icat ions, as derived from NUREQ-0660 t< found
In NUREO-0694
EJBENHltT.D G Division of Licensing B0/06/2fo 3pp
G Ad judicatory
B00731O243 Forwarfls Commiaaion BOD327 meranrandum d order containing
decisions, an UCS 7BO5O2 petition For reconsideration of
7B0413 memorandum «< order UCS 77)104 petition sought action
re fire prntectmn for electrical cables
EISENHUT.DG DivisiDn of Licensing BO/06/25 B9pp
H Oeneral correspondence
BOO7300013 Reeponils to 790409 Itr re nuclear pouer Btatt of IL ha*
seven nuclear pouer plants Reasons for use of nuclear pouir
plants In IL listed in encl eicerpt from util annual rapt
President 771207 statement re Komnnu Cnmmistion Rept encl
DENTON.rf R Office of Nuclear Reactor Regulation. Director
HO/Oi/26 28pp
BOQ733OO37 Heaponds to DO Jourdan BOO338 Itr to J Bchleilnger.
Regulations reo.uire that Bite-naive studies he porfornid to
show that proposed plants will not andanger health Si safety
DENTDN.H H Office of Nuclear Reactor Regulation, Dir«ctor
BO/07/01 2np
— 8007330030 Foriuardi DO JourdBn QO032S Itr For coniiderntlon,
KENDR1CK.H Energy, Dept of BO/O6/O3 3pp
Q Inspection reports, IE Bulletins fc (.orrespnndencn
G OO734Ooa9 Forwards IE Info Notice BO -50, "Loss oF Decay Heat Removal
Capability at Davis-Define Unit 1 While in Refueling Modi "
Mo response required
O'REILLY. J P Region S. Atlanta. Office, of the Director. BQ/03/08,
3pp
8007210483 Forwards IE Circular 80-13. "Grid Strap DaniagB In
Ues ting house Fuel Assemblies " No written response required,
O'flEILLY, J P Replon 2, Atlanta, Dfflcs of the Director. BO/03/M
IP
BOO701O22S Forwards IE InFo Notice 80-33, "Loss of Buction to EmirgenciJ
Fneduater Pumps " No written response required
O'REILLV, J P Region 3- Atlanta. Office of the Director 80/03/39
8007190147 Forwards IE Insp Repts 50-366/80-OB (< SO-S67/BO-08 on
90031 3-1 i No noncompliance noted
MURPHY, C E Region a. Atlant-a* Reactor Construction tt Englnttrlng
Support Branch 80/06/09 2pp
— H007150452 IE Insp Repts 50-3A6/SO-OS t< 30-867/80-08 on BOOB 13-1 A. No
noncomp 1 ian-cc noted Majpr arias inspected' 1 lontee
identified items, Insp follouup 1 tern, uarehousi storage h
observation of safety-related concrete activities
THOMAS., M Region S, Atlanta, Office of the Director
CANTRELL.F E Region 2, Atlanta, Rtactnr Construction tc
Engineering Support Branch BO/06/04 4pp
BOO7320029 Forwards IE Info Notice BO-34, "Evaluation of Contractor
aA Prngrami " No written response required
O'REILLY. JP Region 3. Atlanta. Office of th( Director. BO/06/10
3pp
BOO71i02B7 Forwards IE InFo Notice BO -27- "Degradation of Reactor
Coolant Pump Studs " No specific action or response
required
O'REILUVj J P Region 2, Atlanta, Office of the Director BO/06/ It
BOO72B03B4 Forwards IE Info Notice BO-SBj "Prompt Reporting of Info in
Accordance W/10CFR3O 55<e> " No written response required.
O'REILLY.J P Region 2, Atlanta, Office of the Director. BO/0 1/ 13,
3PP
BOO702O391 Forwardn IE Circular 80-13, "Loss nf Reactor Coolant Pump
Cnaling K Natural Circulation Conldaun " No written reipons*
requi red.
O'REILLY, JP Kcglcn 2, Atlanta. Office of the Director SO/ 06 /SO,
IP
BOO7290422 Forwards IE Insp Repts S0-5f.fi/80-09 fc 50-567/80-09 on
600602-06 No nnncompl lance noted
MURPHY, C E fipuion 3, Atlanta, Realtor Construction (c Engln*ering
Support Branch R(V 06/23 Spp
DOCKETED ITEMS
335
— BO0729O432 IE Imp R«pt> 5O-36t/BO-07 (. SO-367/BQ-Q7 on BQO602-0&
No noncoap 1 lance noted Major areas inspected steel
itructure* ft support* In containment mldlng, uiBlding matl
controli welder qualification Si procedures
HERDT.A R Region 3. Atlanta, Reactor Construction d Encj Inmring
Support Branch CROWLEY. B H Region 2, Atlanta, OFfice of the
Director 80/06/20 6pp
6007170070 Forward* IE Circular BO-14, "Flad 1 naetlvo Contamination at
Plant Daaln>raliied Hater Bys & Resultant Internal
Contamination of Personnel " No written response required
O'REILLYjJP Region 3. Atlanta. Office of the Director BO/Ot/24
IP
BDO7230233 Forwards IE Bulletin BO-16, "Potential Mi Bapp 1 ication aP
ROBBMOunt Inc Model* 1131 & 1152 Pressure Transmitters
,U/Elthar A or D Output Codes " Written response required
IE Circular BO-li also encl No written response required
O'REILLY. J P Region Z. Atlanta, Office of the Director BO/06/27
DOCKET 5TN-3O-5B1 ERIE NUCLEAR PLANT, UNIT 3
A App 1 icati on/ c ans trutt i on stage itiicuments t< correspondence
8OO73300D1 Forwards statement of polity re requirement! to be met for
current OL app 1 ica t 1 onsi as derived From NUREG-0660 t, found
in NUREG~Qc,9<!
EISENHUT, D 0 Division of Uien&lng BO/0&/26 3pp
DOCKET 50-583 BUNDtSERT, UNIT 1
A Application/construction stag* documents & correspondence
6007230001 Forwards statement of policy re requirements to be met for
current OL. applications, as derived from NUREG-OdfiO & Pound
in NUREO-O694
EISENHUT.DO Division of Liconiing
B00721003& Forward! relponn to IE Bulletin BO-OB re-v-iomlnation of
contalnnant liner pinatratlon u*ld* Pen etrat ions at
Buquo<jah,H*ttt Bar I> Btlltfonte cofitain fluid head doEljn
Dailgn for Yellow Creek not yet completed
MILLS, L H Tmntlin Valley Authority BO/07/OQ Spp
S R»port»bl» occurrancaii LEflt h related correspondence
BOO71A0473 Forward! lecond Interim dnficiency rept re const QA audltv
M»«t rapt will b» submitted bg BOOB20 u/o encl
HILLB.L H. TvnniiBflB ValUu Authority BO/07/09 lp
BOO7230239 Part 21 r»pt rn Bri*tol structural steel framino for control
bid) Rawark of filltt wild* t> biing performed Nait rept
will be lubaitted by BOO819
MILLS, L H Ttonetue V«11*(J Authority BO/07/09 3pp
B00717034B Forwirdi final deficiency rept re placement of earthfill
in ERCM iprJiy pond
HILLS'!-, H Tennecmee Valley Authority GO/07/ 1O lp
DOCKET SO-383 ailMDE-SERT. UNIT 2
A App 1 ication/c oil-strut: 1 1 on stage documents ti correspandBncB
„
BO07B300O1 Forwards statement of policy ro requirements to be met for
current OL applications, as derived From NUREG-0660 & found
In NUHEO-O694
E1BENHUT.D Q Division nf LicenBing BO/06/36 3pp
DOCKET STN-30-392 PALO VERDE NUCLEftR STATION. UNIT -1
A Application/construction stage documents 6 correspondence
B007230Q01 Forwards fitatement of policy TP requirements to be met for
current OU ap plit ationa, as derived from NUREG-Ofi&O !< found
In NUREQ-O694
E16EHHUT, D G Division at Licensing 60/06/26 3pp
H Oeneral corrospondenc B
— BOO7170344 Final daflclvncu. rapt re placiment of earthfill in ERCU
ipray pond QA audit r*vtaltd eight items of noncompliance r«
plac»»*nt fc imp of earthf 111, Laborers ulll be assigned to
renove all viflble uniuitable natl during fill placement
• Tonn»*B»» Vallay Authority BO/07/1O. 4pp
BO07110336 Responds to B004O9 1 tr to R Ryan Each unit ulll include
separate fuel bldg for housing neu Fuel area. spent fuel
pool, shipping cask area fc fuel pool cooling & cleanup sys
Detailed description may be found in FSAR. Sec tion t 1
BCHWENCER, A Liconstng Branch S B0/D&/3& 'Ipp
8007170396 Farward* final deficiency rept re const QA audit
MILLSiL.M Tinniimaa Vallou Authority BO/07/1O lp
— B00717039G Final" d»fici«ncij rept re const QA audit Concrete placement
*valuat*d fc found) acceptable Inspectors InstructBd In
r»qulr»«inti of general const spec,
• Tenneiftai Valley Authority 60/07/10 lp
DOCKET BTN-SO-368 MEP NUCLEAR* UNIT 1
A, Application/construe tion >taga documents & correipondence
BOO723QQQ1 Forwardi atatenent of policy re requirements to b» m»t For
current OL appl icationijai derived from NUREQ-OiiO tt found
In NUREO-0&94
EISENHUT, D 0 Division of Licensing BO/O6/26 Zpp
DOCKET BTN-90-993 PALO VERDE NUCLEAR STATION. UNIT 5
A Application/construction stagn document! & correspondence
BO0723OOD1 Foruiarils statement of pnlicii re requirements to be met fo-r
current OL appl i c aliens, ds derived From NUREO-OfiAO fc found
In NUREO-0491
EI6ENHUT, D Q Division -a F Licensing BQ/Oi,'2i, 2pp
H Otneral correspondence
BOO7110B2i Responds to 800409 Itr to R Ryan Each unit mill include
separata Fust bldg for housing neu fuel are^. spent fuel
p nol, shipping cask arsa i fuel pool cooling !< cleanup ays
Detailed description may be found in FBAB, Section 9 1
SCHWENCER.A Li c en* 1 no Branch 2 HO/Ofc/2i 4pp
DOCKET BTN-9D-569 NEP NUCLEAR, UNIT S
A Application/construction stags documents & cDrraspondenee
DOCKET BO-S-JI KQ-R1* UNITS 3 !< 1
A Application/construction «tagu docgmonto i corr a-sponrianc*
S007230O01 Foruards statement of policy re raqulrements to be met for
current OL application*, at d'erived from NUREG-0660 &c found
in NUREQ-0694
EISENHUT. D, 0 Division of Llcinaing BO/Oib/2£, Epp
DOCKET STN-30-3BO ERIE NUCLEAR PLANT. UNIT 1
A Application/construction (tag* documents & correspondence
800723047'? Requests license to mpnrt fiteant generator tompotients to
South Korea
HE89.R J Wustlnghouse Electrir Corp QO/07/1S 3pp
— B007E60497 Advises th-it amend request should remain active Vendor it
applying far separate components license rather than waiting
for amend approval
HEMBY.E Q DFPite of International PrograrnB, Director BO/07/1S
B007230001 Forward* statefflent of policy re requirements to be met for
current DL application*' as derived from NUREG-06&0 t. Found
In NUREfl-0674
CIBENKUT, D 0. Division of Licensing 80/06/36 2pp
— 8007330499 Submits application to amend license to add intermediate
consignee
HESS.R J Wifttjiighoufte electric Cflrp 30/01/10 IB
336
DOCKET 8TN~90-59h NEW HAVEM. UNIT 1
rt Application/construction stage documents & EOTrespondenc e
BOQ7230O01 Forwards statement of policy re requirements to be met for
current QL ap p 1 i cat i mis, as derived from WUREQ-Ot60 !. found
in NUHEB-Oifl4
EISENKUT'D G Division <if Licensing BQ/06/2A Spp
DOCKET STN-30-5<?7 MEU HAVEN, UNIT 2
A Applicat ipn/tonstrm tinn stage documents t. correspondence
BQ0723Q001 Forwards statement of polity re requirements to be met for
current OL app 1 1 rat i-on.fi. 35 denvetf from NUHEQ-Qfc60 ti found
in MUREO-0691
EIBEMHUT.D O Division at Ucunsini) BQ/QA/26 2pp
DOCKET 30-379 CARROLL FACILITY I
C Utility Environmental Report (ER), amends ti correspondence
BOQ71A0627 For-tdards affidavit of svc for distribution of site
suitability environ i-cp 6, Revl aion 3,8uppl 2. i n response to
NRC 790404 r-equflit
NAUGHTOfJ.W F Commonwealth Edison Co 80/05/33 2pp
•G Ad jud icatory correspondence
B0070J0131 Request Pnp eitension until 8D0710 to fi]« orief in
opposition to Citliens Against Nuclear Pouter ti E Qogol
800612 notice uf appeal from ABLE BOO 530 memorandum ti order
NSC Das involved in other adjudication W/Cert i f 1 cate of Bvc.
COLDDERO, B C Hearing Branch 3 BO/Q&/27 4pp
B007D204i2 Brief in opposition to Cttiieno Asainst Nutlear Power et a 1
appeal from rtSLD 900930 order re denial of Contentions l«2i
4-H !. 13 Early site reviem need not include full ravieui
TequirHd under HEP A M/contentiona !> Certificate oF Svc
MILLER, M 1 . OIELrtHSM.A P Commonuioalth Edluort Co MILLER, M I
Iiham, Lincoln fc Deale BO/0&/27 36pp
B0071O0244 Request Fur intension until B007IB to File brief in
opposition to Cltiiens Against Nuclear- Punier, J Runyon ti E
Gogol BO 06 If! appeal frnni ASLD GOO930 memoTandun tt order re
contentions W/notice oP appearanca *, CprtiFicate of Svc
JDMES, D W Hairing Branch 3 BO/07/Of 5pp
B007?aoilO Brief in opposition to Cltiiens Against Nuclear- Pobinr.J
Runyon !< E Gogol aOObia notice of appeal from AELB BOO 530
wemo'randum ft OTder denying intervention Argument ra EI3
constitutes impprrn) fs i b le chatlenge to NBC regulations
GDLDBERO.a C , JONES, D M Hearing Bronch 3 00^07/18 27pp
— B007S3O1SI Butfmariiea veluit on early Bite rcvioui proposed regulations
Supports Idea) in general but opposes application to
re process ing facilities & expresses concerns re certain
technical issuer Certificate of Svc end
BPETHiQ Council on En«iTOnmental Qualltu 77/01/37 Spp
BOG7 100344 Request for eitension until B0071B to file brief In
apposition to CitiienB Against Nuclear PouanO Runyon b E
Qtigol aooiia Jtppcol from ASLD SOO930 memorandum & order re
contentions M/notice of appearance Ei Certificate of Bvc
JONEB.B H HBaring Branch a BO/07/09 Spp
6007220110 Brief in opposition to Citiiens Agalnxt Nuclear Powsr. J
Dunyon t* E Gogol BOOhlS notice of appeal from ABLE BOO 530
<netnoT-andum ti order denying intorvention Argument re EIS
constitutes Impermi sslble -challenge to NRC regulations
QDLDBERO-S C , JONES, D W Hearing Branch 2 80/07/tB H7pp
— 8007220121 Sunwiariios veiuis on early site review proposed regulation*
Supports idea in general but opposes application to
i-Bprocea sing facilities & expresses concerns re certain
tocbnical Issues Certificate of Bvc encl '
BPETH,O Council on Environmental Quality 77/04/27 3pp
DOCKET 30-751 QENESAL ELECTRIC TEST REACTOR
0 Adjudicator^ correspondence
BO 070204 68 Foruiards May 19BO safety: evaluation re CETR
SMANSDN, D T Hearing Dranch 1 SO/Oi/a? lp
DOMESTIC LICENSING OF SPECIAL NUCLEAR MATERIAL
DOCKET 70-0008 BATTELLE COLUMBUS LABORATORIES
B00714003S Foruards. IE Insp Repts 70-0000/BO-01 d 30-0 5728 /6O-O1 on
800422-24 No none omp 1 lance noted
DcWIB.A B RegUn 3, Chicago, Fuel Facility fc Haterlalc Safitu
Branch 90/06/03 3pp
—8007140041 IE Insp Repta 7O-OOOB/SO-01 k 30-05758/60-01 on 800432-24.
No noncompl ianca noted Major areas insp-ecfcad' organl iation>
operations revi eui, f aci li tij changes ti mods, aafetu conmltteai
6 internal & siternal eiposure control
riSHEn.H L Region 3, Chicago, Fuel Facility fc Material* (Safety
Branch BO/06/03 fcpp
BOO7170609 Forwards IE Circular BO-14, "Radiooctive Contamination flf
Plant Demineral li ed Mater Sijs ti Resultant Internal
Contamination of Personnel " No luritten reipon*e -required
KEPPLER.J Q Region 3, Chicago, Office of the Director, 80/06/24
BOO7JBOBOS notifies of fee re-quired for review o.f 79121B refiue*t for
route approval for trtinmant of Honticello spent fuel
IIIULEH.U a License Fee Management Branch 00/07/02 lp
B007350049 Foruarda BOOiOS fe-o requost for NRC review of phyiical
protection plan for SNM of moderate t lou itrategic
significance Payment is requested uithin 15 daijl U/o encl.
WEISS, D License Fee Management Branch BO/07/16 lp
DOCKET 70-OO35 ROCKWELL INTERNATIONAL CORP
DOCKET 50-tOO CARROLL FACILITY II
C Utility Envircinmontal Report ( ER ) j amends & correspondence
BOO7O30009 Fo-ruards IE Bulletin 80-13, "Possible Lois of Ernvrgency
Notification Sys (ENS) tl/Loss of DPfalto Power." Written
response required.
ENCELKEN.R H Region 5, San Francisco, Office of the Director
BO/0&/18 lp
B007160t27 Forwards affidavit of svc toe d istriliution af site
suitability environ rapt, Revi 3i on 3,Suppl 2. in response to
NRC 7904O4 request
HflUOHTON.W F Commonwealth Edison Co 80/05/33 2pp
O Ad .indicatory
6007Q10131 Kenueat for c<tension until E300710 to flic brief in
opposition to CitiienB Afjainsfc Nuclear Power & E Sogol
BO061H notice of appeal from A1L8 BOQSIO mo-moranJum & ordar-
NRC was involved in nth«T adjudication W'Certi f icate of Bvc
OOLDDERO, S C Hearing Branch 2 BO/O6/37 4pp
BOO70204A2 Bi i e f in opposition to (.ititens Against Nuclear Pouier et al
appeal From AS1.D SOO53O order re ilonlal of Cnntentions 1,2,
4-11 t< 13 Early site revi FU need not include full review
•required under NEPA W/contonticns & Certificate of Svc
MILLER. M I . DIELAWSK.I,A P Commonweal th Edison Co MILLER, M 1
I sham, Lincoln & Dnalo SO/D&/27 Shfo
80O7310S42 Forwards revised pages to BOO 507 increment of analysts of
effects of natural phenomena t environmental character
surrounding plant Revisions include significant changes in
demography & minor changes in dispersion meteorology
FOUSE, L C Advanced Fuol & Spent Fuel Licensing Branch 8O/06/1B
6pp
BOO71B02S1 Forwards IE Circular 80-14, "Radioactive Contamination of
Plant Demineraliied Mater 9<js & Resultant Internal
Contamination of Personnel " No written response required
ENQCLKEN.R H Region 5, San Francisco, Office of the Director
BO/06/24 lp
BOO7210475 Forwards IE Insp Rept 70-002S/BO-07 on B00i30-0702 of
activities under License SNM-21 No noncomplionce noted
Major areas inspected physical protection against industrial
sabotage Encl withheld <ref 1QCFHS 790)
NDRDERHAUO, L R Region 5, San Francisco, SBfeguardi Branch.
BO/07/10 lp
337
B0072S05BO Responds to EtOOi!il2 request for reconsideration of amend fee
submitted for NRC review of B00519 physical security plan
Plan will require major amend to License EiNM-21 Therefore.
NRC tee assessment IB ju-stifiei!
M1LLER.W 0 License Fen ManagBmtint Branch BO/07/11 2pp
— B007E309BB Forwards safeguards amend fee for NRC revlou of physical
security plan Requests reconsideration of fee Licensee
submitted plan in response to regulatory requirement & uas
not applying to amend License SNM-21
REMLEYi It E Rockwell Intornat ional Corp , Energy Systems Div
SO/06/ la Ip
6007230649 Forwards revisi'd NUKEB-0561 amending interim rule for
physical protection of ^pent fuel in transit Addl areas
have been designated as he-avilij populated Routes approved
For D!.UJ encl Neui requirements apply B007Q3 W/n snc 1
MC -COBBLE. G H Physical Security Licensing Branch BO/O7/Q3 Ip
Q007250053 Requests notification at appro) meeting date to discuss
status of possible scrap ret overij contract between NRC tt
Facilities NRC hag proposes Atig or Sept 1980 meeting date in
Si Ivor Spring. MD
PARTLOW, J Q Materiel Control Licensing Branch 60/07/13 Ip
BOO7310432 Amends License SNM-21, Sect ion 9 0 by correcting
administrative errors in License Condition 9 A 1 A !c adding
B00314 page change to security plan Approves 800314 request
to use specific type of shotgun at faciltiy
HCCORKLE,Q W Physical Security Licensing Branch 00/07/16 Ip
BOQ7310475 Forwards request for ijddl info fc revisions to E9Q-SO-17i
"Physical Security Plan for Protection of Moderate Strategic
Quantltiei "of BNM at Hot Labs of Energy 9ys Group of
RocltuBll Intl " Encl withheld (ref 10CFR3, 79O>
MCCQRKLE.O H Physical Security Licensing Branch QO/D7/16 Ip
DOCKET 70-0027 BABCQCK tc M1LCOX CO
B007020339 Forwards revised application for amend to License SNM-< la.
replacing 790831 application All reps to alloy shop pickle
operations have been deleted,
CORDANI.R A Babcocli & Uilcox Co . Naval Nuclear Fuel IHv
QO/03/30 Ip
— 3007020350 Replace! 790831 1 tr by Forward i no Revision 4 to License
BNM-4H Revision deletos night shift mgt audit. incorporates
conditions during pouar outage & changes emergency plan Fee
end.
CDRDANliR A Bali cock t. MIlcox Co . Naval Nuclear Fuel Div
BO/03/30 4pp
—8007020365 Application for amend to License 8NM-4Hi deleting night shift
mgt audit, Incorporating conditions during power outagn &
changing emergency plan ai noted
* Bab cock fc Wilcox Co,. Naval Nuclear Fuel Div BO/O5/30 6pp
B007280220 Discusses IE Insp oP License BNM-42 on 800513-16 & foruiapds
IE Imp Rapt 70-0027/BO-07
KENNA.W D Region 2. Atlanta, Safeguards Branch 80/06/03 2pp
DOCKET 70-0033 TEXAS INSTRUMENTS, INC
S007070O4B Toruards page chang&s to Fundamental nuclear matl control
plan Changes include organs i ational r evio i ons» NRC roviou
recommendations li current operational procedures Changes
withheld (rof 10CFR2 790)
BCHWENSFeiR.R Toias Instruments, Inc BO/05/27 3pp
BOO7O303B9 Recommentls approval of page changes to Fundamental nuclear
matl control plan submitted 791 1 ?&. BOO327 Ef O527 License
Conditions 1 1.2 3.3 1,'J 1 1,3 2.6 3 !t B 1 should be
deleted Ltr to vendor & amend encl
HUFF.D Matonal Control Licensing Dranch BO/06/13 Ip
— HOO7030395 Amend HPP-1 to License- SNH-23 pirrmitting use of shipper
values fur U-3Q8 receipt? Licensee shall report all
intentional discords Si matl unaccounted for on monthly
basis
* Material Control Licensing Branch 90/O6/1& 3pp
B00702062S Forwards IE Bulletin BO-15, "Possible LUSH of Emergency
Notification Bys (ENS) H/LOHS of Offatto Pnurer " Written
response required
QFIIER.D H Region 1. Philadelphia! Office of the Director
IP
BOO7I&OQ43 Foruafdfi IE Circular BD-14. "Had i oat tive Contamination of
Plant Demineraliiod Wat or Sys & Resultant Internal
Contamination of Personnel " No written response required
BRIER, B H Region li Philadelphia. Office of the Director
BO/06/24 Ip
BOO7310I67 Ack receipt af QOO&1S Itr in forming NRC of steps taken to
correct violations noted in IE Inap Kept 70-0033/80-06
SMITH, e H Region 1, Philadelphia Fuel Futility & Materials Safety
Branch BO/06/21 Ip
— 0007290233 IE Imp Rupt 70-0027/80-07 on BO0313-16 No noncompl iance
noted Major aruas Inspected operations. organliation. facility
changes t< mortsi internal audits It follouiup of previously
idinUfled Items
CORYELL.O P Reaion E, Atlanta, OffUs of the Director
KAHLEi J B Region 2i Atlantaj BafeQuards Branch 80/06/03 3pp
8007020721 Forwards IE Bulletin BO-13. "Possible LDBS of Emergency
Notification Sy» (ENS) M/Loa> of Off sit* Power " Written
respon** required
O'REILLY.J P Region H, Atlanta, Office of the Director BO/06/1B
BOO7170i49 Forwards IE Circular BO-14. "R«di oactl VB Contamination of
Plant Demineral lied Water By» ti Resultant Internal
Contamination of Personnel " No written response required
O'REILLY, J p Region 2. Atlanta, Office of t!i« Director 80/06/34
Ip.
BOO7B40il9 Amend 11 to Licen»e BNM-42, author liitig deletion of night
•hift manager audit, Audible alarm requirement examption
request denied
PAOE-fi. 0. Uranium Fuel Licensing Branch 80/07/01 tp
— BOO724Q139 DlscuB>«s reviau of BOO 530 licento amend application,
Raeomnends deletion of night shift mgt audit requirement
Denial exemption from audibl* alarm requirements undaf
po*tulated conditions.
KETZLACH.N , CROW, H T Uranium Fuel Licensing Branch 00/07/01
3pp
8007210097 Notifies that 791109 request For route approval involvinu
spent fuel shipment to Nuclear Engineering Co in HanPord
Works, HA ii subj to licente fee schedule flavieiu completed on
B003B6
MILLEH.M D Licence F»e Managnment Branch BO/07/O3 Ip
— 0007310173 Responds tn NRC HC&52H Itr re violations noted in IE I nap
flept 70-0033/BO-O6 Correcrivo actions route card for metal
drurna revised to show drums jre approved rinly for
contaminated metal uaste
&CHUENSFEIR.R Teias InstrumentG. 1 nc 90/06/12 2pp
—B007S101BO foruiards IE Insp Repl 70-C033/ao-Oo on B0042I-2S !, notice
of violation
BMI7H.O H Region I. Plii 1 adp Jp h la, Fuel Facility t< Materials
Safety Dranch 30/05/23 2pp
— B00721O184 Notice of violation frnm insp on B0042I-3S
* Region 1. Philadelphia. Office of the Director BO/O5/3S IP
— S007210193 IE Insp Rept 7Q-O033/aO-Ot on 8001S1-23 Noncomp 1 ianc e noled
failure to Follow posted man safe quality at uork station
KINNEY.M W Region 1. Philadelphia. Office of the Director
CROCKER, H H Region 1. Philadelphia, Fuel Facility & Material*
Safety Dranch BO/O3/22 9p p
15007310098 Request a payment of admini strnt 1 vc amend Fee In connection
u/BOO&lB request for delay in submitting safeguards plan
WE18S, 0 D LicntiBH Fee Manflgcmcrit Branch BO/07/09 Ip
80O7220S27 Advises that requiremt-ntE Por IE Bullntln 00-15j "PoBBible
LOSE of Etnergenry Notification Sij*. u/Lnss of Offslte Pauer"
have been completed
SHERMAN.F L Te«nn I nstrumBii ta, Inc BO/O7/I6 3pp
8007250443 Responits to IE Bulletin 00-15, "Potsiblo Loss of EmerBtncg
Notification 6ij5 t£N3) M/LDGS of QPPsJttf Pouor " Dulletin
requirements have been completed Thono operating on
emergency punier unr, successful ILI tested ui/NKC on f) 007 16
BHERMAN.F L l«<a<( I nitrumEnts. Inc 80/07/21 3pp
DOCKET 7O-QO3i COMBUSTION ENGINEERING, IMC
B007170A1V Forward* IE Circular BO-tfl. "Radioactive Contamination of
Plant DimLnarfll lied Mater Sys & Remit ant Internal
CotitonlUBtioii of Permnnel " No written response required
KEPPLER.J O Region 3, Chicago. Office of the Director BQ/Oi/24
B007170632 Responds to 800625 1 tr IE i equest for oitension to completi
r-equirempnts of 10CFfi?0 51 for 1 ou pnricheS U mail balance
period ending OOO61J Licpnsi.e shrill rumpleto mall halaiiLE
by BOQ725
PARTLQU, ,J G Material Control Lirensing Pranifi 80/O7/O3 Ip
BO071BQ37a flck roceipt of B006Jb 1 tr requesting amend to License
SHM-llS Approval ura s grdnt^d on D007O3 Amend re^ulras
DOCKET 7O-O133 BABCdCK, b H1LCOX CD
BOO714O444 Forwards IE Intf Hept 70-0133/60-08 d 70-361/HO-07 on
BOQ303-S!9 No noneompltanc e noted
MARTIN, H O Region 1. Philadelphia. Safeguards Branch flO/05/
-ir*>0714OMB IE Imp Hepts 70-013S/BO-DB tt 70-O3M/BO-07 on BOQ303-2B
No noncnmpl i>nc» notld Major areas inspected rnatl control !i
•ccD.untlngi phu, tlcal it-curl ty, health b industrial safety Info
withheld (r-ef 10CFR2 790)
JOYNEFt.J H F KU8HN6R.H L Region 1. Phi Ud ff Iph ia. Fuel Facility t,
Matvrlali Satiety Branch BO/OS/OB ?pp
BOO7Q2OOOS Ack receipt of BOOS 13 Itr informing NRC of *teps taken to
•atitfy con«itiiient mad» per IE Insf Rejits 70-0135/SO-O9 &
70-0364/HO-OB
HAttTINiU.0 n«glan 1< Philadelphia, 9aPBjjuari)B Branch BQ/O5/3B
IP.
— 8007020005 Confirms action taken to implement comml tment raa-de per IE
In»p R*pti 70-OI3S/SO-09 «c 70-0364/eo-OB Corrective actions
rtwlnni lou inrlchiiT U phvsic'l Inventorij to incorporate
Commitment to ron*iiur» >ach tirangl nitrate tank
M«T1N,M A. Babcock i, MlUoi Co . Nuclear Material Oiv. BO/D3/12
IP
— O007020(Xia Forwards IE Imp Rcpts 70-O13S/80-D17 S. '70-0361/BO-OB on
800317-20 & 24-26 No roncamp 1 i ante no toil
MARTIN, U 0 Region 1, Philadelphia. Safeguard! Branch 80/04/22
Zap
DOCKET 70-O113 NUCLEAR FUEL 'llfiVICE1!, INC
90O717O620 Appoints WJ Dircl<i to coordinate personnel to evaluate MUF
diacTepanfy at facility I) Burnett u 1 1 1 supervise NFIC
personnel at site RequeGtc ,1 Jvi 'icment nf Jny reiourco
problems ro administrative t'/m (icrEoniipl supcort
QQSS1CH.L V Office at the Eipn.tivn Diroetmr foi Dpordtlons
79/09/1B Ip
BOO3250Q(,fl Diacusaeo 000205 -07 ilto visit to assess ef f ec 1 1 venefia of
neti) process moTii tmvlncj rt'iniirements DUB to incomplete
feedstock di55olultinn.il of IT' it issolut ion batches alarmed
Further review will be maile dining 8O02?3 site vialt
JOY. D R Haterial Control Licensing Biancli BO/O3/O3 Ip
8OD71I0006 FDIA ri'qupst for 11 documents concerning Facility
COCHHANj T D Natural Resaurcos Dnfcnsc Council 80/04/10 2pp
60O7140513 ForDflrds IE Insp Rept 70-0113/00-12 nn B00317-O124
KEWNA.U 8 Region B> Atlanta, Safeguards Dr.inch SO/03/lt 3pp
— 0007140537 IE Insp Kept 70-0143/00-12 nil 800317-0424 No noncomp 1 lance
noted Major areas Inspected phijiical inventory ob sorvations
& verification Details withheld <rpf JOCrflB 790>
CLAV.C L , GILtFSPIE.F P Rpgion P, Atlanta. Safeguards Branch
. J U Rogion B, Atlanta. Office of the Director BO/O3/15
— »OO70aOOia IE Imp R«pt» 7O-0133/BO-O9 & 70~03M/BO-OB on B00317-20 t
24-S-6. No noncomp 1 ianci noted Ha JOT areas inspucted
n«»*ur«m«nti (• ttativtlcal con troll Ditallf iulthh»ld
<r»f 10CFBK 790)
jaVNCRiJ.H Region i, Philadelphia. Bafeguards Branch
HOLODY.D.O Region 1, Phil j* t Iph 1 a. Office of the Director
BO/04/17. Ip
BOO717O&K3 Foruardt IE Imp ReptB 70-0139/80-13 t, 7O-0364/BO-13 on
aOOS03-07. Ho nontompliancB nofcad
HARTIN.Vl.O Replnn I. PhlladrtpliUi Safeguards Branch 8D/09/2B
BOO7aB0179 Safety evaluation re HP'S proposed remedial actions t nther
alteinativnE re soil c nntaminot ion Recommends contaminated
Banner Spring Dram h stream bed bu fpncod until final action
at decommi 55 ionintj
CROW.W T , SHUH.E V Uranium Fuel Liconfiing Branch BO/OA/Oi,
13PP
— 800789(1194 Fpruards "InvBr>ti gat i an Progress Repl of Boil Contamination
(Former Creek BotU at NPS-Eruiin "
MICHELpC j Nuclear Fuel tor vi<. 01, Inc (aubc of Getty Oil Co, )
BO/02/04 Ip
— 0007170A3O IE Inp Rept» 70-O135/BO-I3 tt 70-O361/BO-1S on B0030S-O9
No nanttiMbllance notid Major areas inspecteiS physical
inv«ntoru d internal contrnla Details uithhelri
<ref 10CFR9. 79G)
BIBBETT.P H . JOYNERi J H Region 1. Philadelphia. Office af the
Director BO/OS/37 Ip.
M0714O57fi Respond* tn 90011A I Ir Tenuesting exemptton from 10CFR73
rtiuir*«*nt» Applicabllltg of regulation should bP
d«trr«inid for v«rlou& type» of BNM ua»te (, approprlBte
•pplfcatlon ihould b« nadt
HCCORKLE.O W. Phgcicftk Srcurlty Licensing Branch 80/O&/12 2pp
BOO? 2202 11 FarutTt* AneniJ a to License SNM-143, revising Spec 1-4
<arganiiatlDti) b Sp<c 1-5 (Tech Specs & control HJE) of
condttlani lactlan of application
PAO€. R, 0 Uranium Fuel Litensing Branch BO/Oi/23 Spp
— 8Q072B01B7 " Invest i gat ion Progress Rcpt of Soil Contamination
(Formcv Crook Bed) at Nrs-Erwin "
* Nuclear Fuel EOrvicea. Inc (oulis of Oetty Oil Co ) BO/01/31
JBpp
B 007 2 3 0376 I)i Bripprovos uf Uocislun t ouchEd tiij NRC re continued
operations of NFB fatilitg Due tn 1'ibor conflict !< licensing
violations. Facility operated lens thnn all month B during
It?"} QualJty production impur tiint In such facility
N Affiliation Unknnuin 90/06/10 3pp
B007010105 Aclc receipt of SOO">11 i tr informing NFIC of steps taken to
correct violations noted in IE Insp Rept 70-0143/HO-OB
HENNA.U n Heaton 2, Atlanta. SafppunrJK Qrancli aO/0<b/ll Ip
— B0070J0107 Responds to NRC BOOOHD Itr re violations noted In IE Insp
Bept 70-0143/BO-dS CorvocCivn 31 tions withhold (ref
10CFR? 7"?O>
MrtNBEn.H C Nurlear Kuol Sorviri";, Ine (subs of Gotty Oil Co i
QO/OS/H Ip
-B00701OH7 Tnrunrds IE Inap Kept 70~011J/GO-(1Q an 000311-14 & notice of
violation Notice- nf violation withhold Iref 10CFH3 790)
KENNA, W n Rnoion y, Atlanta, Safeguards Branch 80/O4/28 2pp
-000701011!') IE Insp Kept 7Q-OllrJ/M)-08 on 8003U-11 Nnocompl lance noted
Failure to fiillcui jirov odnres Details uiithheld (ref
IOCFRH 790)
PERNY, C D . OIIUE-SPIE. F f flegion 2, Atlanta. Safeguards Branch
BO/04/28 Ip
SO07010331 Responds ro i30060:i rfijuuiit for clianflB In matl balance area
structure re Plant [1 Chcingc- IB acceptable Lirense Condition
3 6 is added io Amend MfP-1 of License SNM-124
PARTLOW.JO M.ifcerial Control Litensiny Branch, BO/06/17 Ip
DOCKETED ITEMS
339
0007030293 Act receipt of IE Insp Hi.pt 70-0143/90-13 No proprietary
Info
MANSER. U C Nuclear Fuel Services, Inc (subs of Dotty Oil Co )
BO/06/ 17 Ip
— BOQ7030399 Forward! IE Insp Rept 7O-0143/BO-15 on B00513-1& No
noncunp llano noted
KENNAiU B Raglc-n 2, Atlanta, Safeguards Branch 80/06/03 3p p
•— •BOO703029B IE Imp Rept 7O-0143/BO-1 3 on 300313-16 No noncompl iance
not«d Kajor areas. Inspected records & rents. facili ty
organliatlom operation Ic mgt of matls control ays
HOMES, J M, , OILLE9PIE, F P Region 2, Atlanta. Safeguard* Branch
BO/O6/O3 3pp
BO0702072? Forwards IE Bulletin 80-13, "Possible Loss of Emergency
Notification By* (ENS) kl/Loss of OFfslte Power " Written
response required
B'REILLY.J P Region 2. Atlanta. Office of the Director BQ/06/IB
8007 1 HO 3 3 S For word! Revision 14 to fundamental nuclear matl control
plan, Ltr & reviiion withheld (ref 1OCFRS 77O)
HENSLEY.K D Nuclear Fuel Services. Inc (subs of Oetty Oil Co >
BO/OA/1B 2pp.
9007020290 Report! M»nhours used in reviewing 790839 application for
•wend of Licence BNH-1B4
uGLANEY.J.C. Uranium Fuel Licensing Branch BO/06/19 Ip
BOO70B03O4 Rtport* nanhuurs used in reviewing 790330 application for
**tnd of License 8MN-1H4
DELANEY.J.C Uranium Fuel Licensing Branch BO/06/19 Ip
— B00714OQ64 Responds to NRC B00514 Itr re violations noted in IE Insp
Rept 70-0143/00-14 Corrective actions withheld <ret
10CFFIS 790)
MANBER.W c Nuclear Fuel Servn.es, Inc (subs of Getty Oil CD 1
00/O6/O3 lp
— BO07140Q67 Forwards IE Iusp Rept 70-0143/BO-l 4 on B00422-23 t, notice
of violation Notice of violation withheld (ref 10CFR2 77O)
HENNA. WB Region 2, Atlanta. Safeguards Branch BO/05/14 2pp
—8007140073 IE Insp Rept 70-0143/90-14 on 800422-25 None omp 1 lane e noted
failure to notify NHC of change made to matl control !.
accounting program mithin 3 months of change Details
withheld (ref 10CFR3 7-7O)
DATES, J W Region 3. Atlanta. Office of the Director
OILLEBPIE.F P Region 2, Atlanta, Safeguards Branch 80/03/14
IP
8007110334 Grants 800613 request, ui/NHC mods, for delay In determining U
inventory difference value re (300^27 highly enriched U
physical inventory of Plant 1 Conditions added to Amend
MPP-1 of License SNH-124
BURNETT, R F Division of Safeguards 90/06/36 2pp
QOO7020637 Forward! process monitoring charts uhich provide summary
required by NRC B00626 Itr End withheld <reP 10CFR3 790t
MANBERjW C Nuclpar Fuel Services, Inc ISUDE of Getty Oil Co )
80/06/27 lp
BOO 7 02 04 4 5 Note forwarding corrected version of Commission BO 0626
memorandum & order, CLI-SQ-27 t< Commission (100637 natlce of
hearing in License SNM-124 procEedlng
•» Docketing S< Services Drflnch BO/06/37 lp
8007070010 Aek receipt of BOO 309 Itr informing NRC nf steps taken to
cornet violations noted in IE Insp Rept 7O-OH3/BO-Q4
O'REIU-V, J, P_ Region S, Atlanta. Office of the Director 00/06/17
— 6007070014 Baiponda to NRC B00416 Itr r» violations noted in IE Insp
R»pt 70-01 43/BO-O4. Corrective actions shipments dl »co»itlnued
until program has be*n established to prevent recurrence of
infraction
MANSER, W C Nuclear Fuel Services, Inc (subs of Oetty Oil Co, 5
BO/03/09. &pp
— B007070019 Forwards IE Insp Rapt 70-0143/60-04 on 000221 fc notice of
Violation
BTOHR.J P Region 2, Atlanta, Fuel Facility t, Materials Safety
Branch 80/04/1 A 2pp
— B007070017 Notice, of violation from insp an 800231
* Region 2- Atlanta, Office of the Director BO/ 04/1 6
2pp
--B007070019 IE Inip Rept 70-0143/80-04 on 800231 Noncomp 1 lane* notad
failure to transfer BUM in accordance u/term> d condition
of recipitnt radioactive matl licente & to adequately
survey package prior to shipment tt transfer.
DAVIS, J H Region 2. Atlanta, Office of the Dinctor OIBEDN,A F
R*fllon 2, Atlanta, Fuel Facility & Materials Bafvty Branch
BO/04/14 3pp.
BOO714007B Forward i IE Imp R«pt 70-0143/60-17 on BOQ424-0923 No
nonconpl lance noted
KENNA, W, B Region 2, Atlanta, Safeguards Branch SO/06/24. lp,
— B0071400B6 IE Insp Rept 70-0143/60-17 on 000424-0833 No noncomplianc*
noted Hajor ar*«n inspected. contributors to cumulative
inventory differences h iiinrder concerns Details withheld
(ref 1DCFRB. 790).
LEE, T, D , JONEB.D.M Region 2, Atlanta, Office of the Director.
OIlXESPIEiF P. Hug Ion 3* Atlanta, Safeguard* Branch B 0/06/24.
lp.
B00719053Z Discusses Commlsttion order allowing resumption of operation
u/related condition* t granting pott-hearing alternative for
vhich NRDC re»ponded u/o Ccmmi»*ion subsequent action Urges
that milltaru function BUC-eption not be invoked
HEiaa, E R Sheldon, Harmon 1< Welts BO/06/E4 2pp
B007170194 Forwards IE Circular BO-14. "Radioective Contamination of
Plant DeftlnaraliiBd Mater 8yt It Resultant Internal
Contamination of PBrsonnel " No urittin response required.
O'REILUY. J,P, Region Z, Atlanta, Offlc* of the Dlroctnr 30/06/84
B00714O03B Ae* receipt of B00603 Itr informina NRC of steps taken to
correct violations noted In IE Insp R*pt 70-0143/80-14
, KENNA, H. B R*glon2, Atlanta, Safeguards Branch BO/O6/H3 lp
— 8007020647 Corrected memorandum «. order. CLI-BO-27, granting NRDC 800206
request for hearing ro whether License SNM-134 should; be
revoked Contemplates informal procedural Frameuork <lue to
sensitive military issues re weapons enriched ui/U
CHILK.S d Office of the Secretary of the Commission, 80/06/36
llpp
— B 0070 206 5 6 Corrected notice of legislative hearing in response to NRDC
E002O6 request," revocation op License SHM-124 Written
factual t< legal testimony due by E00901, suggos tlons by
B0091S Oral argument scheduled for 801015-1101
CH1LK.S J Office- of the Secretary of the Commission BO/06/S7
4pn
— 8007020660 "Amend to Rules of General Applicability Providing Eiception
from Procedues fo-r Adjudications re Conduct of Military or
Foreign Affairs Functions," 10CFH2 immediately effective
final rule Permits more flexible due process limits
CHILK.S J Office nf the Secretary of the Commission BO/06/26
12pp
BOQ7070333 Forwards MFS QA prooi am re shipping packages For radioactive
matl per 800434 request
MICHEL,C J Nuclear Fuel Services, Inc (subs of Getty Oil Co 1
80/06/27 lp
— 3007070339 OA program far shipping pacVages for radioactive matl
* Nuclear Fuel Services, Inc (subs of Getty Oil Co ) BO/06/ 13,
3Ipp
BGO71QQQOQ Add) response to FOIA leijuost For documents ro licensing of
facility I. transcripts of closed Commission meetings App A
documents available in PDR Document 1 nf App D b portions
of Documents H-H1 withheld (ref FOIA Exemptions 3.4 d 5>
FELTON.J M Division oP Rules and Records 80/O6/27 9pp
— BQ071QO013 DiacuEEBB application of inventorij difference regressinni
equation to Aug inventory Info withheld procedures for
safeguarding nuclear matl !< NltC prodecislonal advice,
opinions t, recommendat lonn (rof FOIA Eiemptlons 4 !i 5)
MEBS1NOER, H Katei-ial Control t< Accountability Development Dranch
79/09/26 3pp
— B007100020 Summary of BOO 10 3-0 3 meeting betueen utl) !. NRC In Silver
Spring, MO re MCA license conditions applicable for resumed
highly enriched U operations Info partially withheld
(ref FOIA Exemptions 1 & 51 Charts enll
JOY, D Material Control Licensing Branch SO/01/1Q lp
— B007100023 Forwards matl balances covering Inventory for 790B14-1Q04
Info withheld safe-guards ti tpcuritit measures (ref FOIA
Exemptions 3 fc 4)
HENSLEY.K D Nuclear Fuel SServlces, Inc (subs of Getty Oil Co )
79/13/03 Spp
340
DOCKETED ITEMS
— S00710002B Foruaros
designed to impro
Eiemptions 3 t, 1 1
TAYLOR, C W fSuclear F
79/1O/23 ID
tnileit rcjit on current *< planned projects
Facility accoun tabi 1 1 tij ty s ti associated
result* Rppt withheld Irisf FOIA
)1 Servires, Inc (subs of Getty Oil Co )
BOQ7150963 Forwards site security training p Ian, Revi sion t Change*
make corrections on site-specific implementation b do not
lessen effectiveness of site security training or physical
protection plan Revision 1 withheld (ref IOCFR2 79O)
MICHEL. C J Nuclear Fuel Services, Inc <auba of Getty Oil Co )
HO/O7/01 lp
— B0071QCO32 Discusses SECY-77-iSOA, "NRC Regulation of Highly Enriched
U Operations nt Facility " Lists ad d 1 requiremonts needed if
position taken by JF Ahearne in. B00109 nvmo 15 adapted Info
partially uithhelri (ref FOIA Eiomption 3)
KANIWHAN. E J Material Control Licensing Branch BQ/OI/11 Spp
— B007in003B Sundry of Commission SOOllfc meeting re SECY-79-ifc50 & 6ECY-
79-630A concerning facility Scnpe t, quality of mat I control
ti accounting element a uiould be improved Summer i i es proposed
actions Info partially withheld <ref FDIA Eiemptlon 3>
M, C J Material Control Licensing Drench BO/01/15 Epp
— BQQ71.uOO'14 DISCUIBBB 791Q04 inventory difference oF high enriched U
oiceeding limit of error constraint Fnruiarrfa rapt detailing
causes contributing to inventory differences t< corrective
actions tolcen Kept withheld <reF FDIA Eiempticm 31
TAYLOR, C W Nuclear Fuel Services. Inc Isubi of Getty Oil Co >
79/11/O2 2pp
— B0071OQ052 FariodrrtB c omrrrcn ts on JO Partlny 770535 1 tr to KB Hanaley
InFo withheld safeguards I, security measures <reF FOIA
Eiemption 3)
HENSLEY.K D MueJear Fuel Services, Inc (subs of Getty Oil CD >
79/07/Qi 3pp
— 0007100057 Submits list of recent mods at facility which upgraded matl
accountability I, control program Info mitfiheld procedures
For safeguarding licensed SNH ireF FOIA Eiemptiori 4)
JOY. D R Material Control Licensing Branch 79/09/11 2pp
GOQ72 10039 Notifies that fee submitted iu/790330 application for Amend 9
to License SNM-124 ui 1 1 be partially refunded in accordance
uj/manp oiuer eipendi tures review
MILLER, H 0 License Fee Management Dranch 80/07/01 lp
HOO71B-030B Foruari!a IE Insp Rept 7O-0143/BO-19 on BOOili-t1? fc notiCd of
violation Notice of violation uitJiheld <rof 10CFR3 790)
KENWA.W D Region 3, Atlanta. Safeguards Dranch BO/O7/07 Bpp
— B007IB0316 IE Insp Dept 70-01fl3/BO-t9 on B00616-19 Noneompl iunce nottd
failure to annually recertify one neui std in each NDA torl»t
k Failure to make grncess & engineering studies Details
withheld Iref IOCFR2 790)
DATES, J U Raglan 2, Atlanta. Office of the Director
GILLEBPIE.F P Region 3, Atlanta, Bareguards Dranch SO/07/03
BOO715051B Forwards rovinnd Page 139 to Amend Request 78- 5 nuhmlttvd
7B09H? ft Tecubmitted as Amond Request BO-1 on BOOISI Amend
can be Issued ui/eiempt Ion from License 8NM-124 Condition 2?
requested on 791.107
MICHELi C. O Nuclear Fuel Services, Inc (aubo of Qettg Oil Co )
aO/07/09 app
— BOO? 150330 Requi-ets License SNM-134 be amended to allou transport of
enriched U outside confines of plant Shipments will be
limited to 3 kg U-233
MICHEL, C F Nuclear Fuel Services, Inc (subH of Getty Oil Co )
70/06/37 app
— B0071OOO6? Forwards info status rept re 790B14 inventory d if f erenc&a of
highly, enriched U eiceeding limit of error constraint Info
withheld procedures for ua Poguard ing nuclear matl Iref FDIA
Exemption 41
HENSLEY, K D Nuclear Fuel Services. Inc (iuba off Oettg Oil Co >
79/10/03 3pp
— BQ07100076. Notifips of 79DB16 meeting u/util to dlscuse highly enriched
U inventory difference post, present t, Future Foruards
lilting of topics ro inventory differences which will be
included in ti i s truss inns U/a end
BHITH.C N Hearing Branch 3 79/OB/O-l lp
00-07330003 Answer to Commission notice of hearing stating NRC
uillingnesa to participate aa party Svc may be made on OH
Cunningham d RL Fonner on behalf oF NHC Certificate of Sve
end
CUNNINGHAM.O H RegulatioiiB Division BO/07/14 Bpp
BOO732O343 Addl response to FOIA request for info concerning facility
Honn»empt portions of documents listed in app are located in
DC PDR DocumentB 1.2 !. 3 partially withheld <ref FOIA
Eiemptions 4 t SI Documents 3 d A are undergoing review
FELTON, J M Division of Rules and Records 60/07/16 3pp
— H00710Q072 Summary of 790BI6 meeting between utl] t, NRC in Dethesda.MD
ra concerns of highly enriched U inven tori) difference
behavior Inventory dlffer-entE is licensee problflrt [nfo
partially ulthht>ld trt?f FOIA Eienptlon 31
JOY, D Material Control Licensing Branch 79/OB/21 2pp
— 80071000B1 SumraflTu of 790Q1A meeting u/util Lists major ufcll concerns
including improving oF accounting ey* Majoritij of meeting
spent DTI reportins status of NRC questions InFo pai-tiallij
uiithhnlit (ref FCHA E.emption 3)
PftFlTLDU.J 0 Material Cent nil Llcensino Branch 79/OS/17 2pp
B00711OO01 Reaponda to FOIA request for 11 documents concerning
facility Itema 2,3 I< 5-10 hnvs been addresoed in earlier NRC
responses Attachment D oF Document II withheld Cref FOIA
Exemption 4 b )OCF(i2 790 >
FELTON.J M Division of Ruloi and Records BO/06/27 Epp
— S 007220240 Revised conditions to Amend HPP-1 to License SUM- 124
BURNETT. R F Division of Safeguard! 80/02/01 3pp
— a 007220251 Discusses 800227-29 site visit to further evaluate
effectiveness of new process monitoring license condition!.
Info partially withheld (raf FOIA Eiemptions 4 & St
Responses to ti Udall questions dtd BOQ306 enc 1
JOY, D R Material Control Licensing Dranch SO/03/11 4pp
B007S90072 Notifies of issuance of Amend 7 to License SNM-124, providing
eiemption from requirement that emergency evacuation drill
be conducted at least annually for each shift
PAGE.R D Uranium Recovery Licensing Dranch SO/O7/16 lp
— 80072900B3 Safety evaluation supporting Amend 7 to License BNM-124
DELANEViJ C Uranium RG CD very Licensing Dranch CROW, W T
Uranium Fuel Licensing Branch SO/07/16 lp
— B007110C07 Neu !, revised conditions to Amend HPP-I to License SNM-124
» Commission 80/01/31 llpp
B007160B38 Ack receipt of BO0603 r. 11 Itrs informlno NRC qf atepH talen
in response to concerns noted in IE tnap Rept 5
70-01 43/7"?-49 ft 7U-OI43/BQ-12
HENNA. W D Kegion 9, Atlanta, Safeguards Branch CO/0&yS7 If
— B0071tOB43 Roquests iO-daij eitwnsion to respond to concerns, identified
in IE Insp Rept 70-0143/79-49
HANSER.U C riu<.lear Tuel Services, Inc (Bubs of Oetto Oil Co )
BO/04/OB lp
BO073000aa Addl respDnse to FOIA request for matl received, considered
nr approved by Commission during consideration of facility
inventory InFo paitially uiithhold security measures &
restricted data (ref FDIA Etemptions 3 & 4)
F6LTDN,J M Division of riules and Records BO/O7/1& 3p
— B007300094 DiscuBSBB reporting of facility 790918-1004 inventory
difference llraPt physical protection license conditions
end License condition partially withheld safeguarding
procedures (rof FOIA Eiemption 4)
DIF1CKS, W J Office of Nuclear Material Safety (< Safeguards
79/10/32 8pp
B007070191 Requests that Attachmpnt A of Insp Rept 70-0143/BO-O1
be sjithheld (ref lOCFRH 790)
MANSER, W C Nuclear Fuel Services. Inc (subs of Getty Oil Co )
BO/0&/3O 3pp
8007070350 Responds to requeit for info re c nntami nati on control
program in SNM~0134i flmend 5 Provides revised personnel exit
procedures & per tunnel surveys
MANSER. H C Nuclear Fuel Strvice=, i nc Isuhs of Getty Oil Co J
SO/06/30 2pp
-B007300103 Discusses facility inventory difference For 79061B-Ofil8 NFS
is ceasing all production operations & preparing for plant
inventory in accordance u/NMSS orders Info partially
withheld restricted data Cref FQ1A Eiemption 3)
DIRCKS. H J OfFice of Nuclear Material Safety & Safeguards
79/09/17 lp
8O073B0993 Forwards respanoa to NHC 800624 Itr re violations no tod in
IE Imp Rept 7O-OI43/BO-20 Response withheld (ref
1DCFR2 790)
MANSER, M C Nuclear Fuel Services. Inc (subs of Getty Oil Co )
BO/O7/1B IP
0007350*44 Forwards response to IE Insp Rent 70-O143/BO-19 Jieaponae
withheld <rtf 10CFR2 7?o>
HAN8ER.W C Nutlear Fuel SarviceB, Inc (subs of Oetty Oil Co )
80/07/21 lp
BO0739O713 Responds to NRC B00626 Itr ro IE Insp Rept 7O-0143/SO-13
Attachment abates correctivu action taken U/o end
MANSER. U C Nuclear Fuel Services. Inc (subs of Getty Oil Co 1
80/07/H1 lp
BO07290S47 Forwards general soil decontamination plan, per OOQ71S
request
MICHEL. C J Nuclear Fuel Services. Inc (subs of Getty ail Co )
00/07/23, 4pp
DOCKET 70-01S7 TEXAS. UNIV. OF
— B007HO&4S IE Insp Repts 70-0135/HD-OB *- 7Q-03&4/BO-Q7 on 800303-29
No none omp 1 lanco noted Major areas uisjiectecl mat) control !.
account ing. ph-ys i tal secur i ty, h eal th 'i industrial safety Info
withheld Iref 1OCFR2 79O)
JDVNER.JH , KUBHNER, W L Region 1, Ph i lad elpfi i a,. Fuel Facility &
Materials Safety Branch BO/Q5/0& 9pp
BOO70200O2 Acti receipt oP 800512 Itr informing NRC oF stops taken to
satisfy commitment made pur IK Insp Repts 70-0133/80-07 ii
7O-0364/BO-OS
MARTIN, W G Region 1, Philadelphia. Safeguards Branch BO/O5/23
IP
— 0007020005 Confirms action taken to implement corami ttne-n t made per IE
Inap Repts 7Q-0 1 35/BQ-09 & 70 -0364 /BO- 08 Corrective actions
revised Inu enriched U physical inventory to incorporate
commitment to rernea^ura each urany 1 nitrate tank
AUSTIN, M A Qabcocl *c Wilcoi Co , Nuclear Material Dlv BO/O9/12
— H0070aOOOB Forwards IE Insp Flepts 70-0135/60-09 & 70-03d4/80-OB on
800317-20 I 34-2(1 No noncompl i ance noted
MARTIN. W 0 Region I, Philadelphia, Safeguards Branch 8Q/04/23
2pp
BOO72 10320 Respond* to IE Dulletln 79-17, "Packaging of Lou Level
Raduaste Far Transport fe Burial " Wastes are deposited in
plantlc bag In lliBd steel containera Wlste collvctinn
contractor is responsiulo far ultimate disposal
BURACK. J A Texas, Univ of, 7"7/0-?/Q4 2pp
— 8007210334 Forwards IE Bulletin 79-19. "Packaging at Lou Level Radui-aste
for Transport b Durial. " & list of bulletins issued In last
b months Requests reiponse to IE Bulletin 79—17
SEYFRIT.K.V neoliin 4, Dallas, Office of the Director 79/OB/1O
—3007020012 IE Insp Repts 70-O133/BO-0? f< 70-0364/90-OB an B003J7-20 t.
24-at Mo noncnmp 1 lance noted Major areas inspected
measurements & statistical tontrola Details withheld
(ref iOCFR2 790)
JOVNEH.JH Region 1. Philadelphia, Safeguards Qrancli
HBLODY, B J Region t, Philadelphia. Office of the Director
80/04/17 lp
BOO7170622 Foruiards IE Insp Repts 70-Q135/BO-1 3 & 70-0364/80-12 on
B00505-0? No noncomp 1 isncn noted
MARTIN.HQ Region 1, Ph i laoel ph la, Saf EguarJB Brunch BO/05/2H
2pp
DOCKET 7O-01B4 MEETINGHOUSE ELECTRIC CORP
BO07230O14 Advltei of correct address for future correspondence In
reBponia to 600602 Itr Revised radiation safety manual haa
DBBTI foruarded to Hatlt Licensing Branch
KINNEKAN.J D Region 1, Philadelphia. Fuel Facilltg (< Materials
BaFtty Branch HO/O7/oa, lp
— BO07230019 For mar du revised radiation procedure tt safety manual U/o
end
BtWWENDERO, C, Westlnghouse Else trie Corp BO/06/OS lp
— SO07170630 !E Insp Rcpfcs 70-0 135/BO-13 tt 70-0364/90-12 on 000505-09
No none nmp 1 lane e notad Major areas ins-petted physical
inventory Si internal controls Details withheld
(ref 10CFR2 79O)
DIfiSETT, P H , JdVNER, J H Region \, Philadelphia. Office of the
Director BO/O9/27 lp
B00714059B Responds to (3OO1I6 Itr requestinfl eieroptipn from 10CFH73
reciuirefnents App 1 1 cab i 1 ity of regulation should be
determined for various types oF SNM waste d appropngte
appllcatLan should be made
MCCOrWLE, G » Phyalcal Security Licensing Branch BG/Oi/12 2pp
DOCKET 70-0203 NOTRE DAMET.UNIV OF
BO07O10047 Ack receipt qf B003SB Itr informing NHC of steps taken to
correct nanconpllnnce Identified in 000313 1 tr. Discusses
llc»nia* ilanial of noncamp 1 lone* Item 10, fill-month leak test
1* requlrod Supporting docunmntatloti encl
KEPPLGR, J O Region 3, Chicago, Office of the Director 00/06/07
Bpp.
—90O7O100&0 Requests that provision for possenian of Pu-berijll ium b«
rtHdvad from Lice-nss SNM-19B Also reqgeits designation of TJ
Hlrons as course instructor & only pepson rff»ponsllile for
handling leak tBBtlntj,
CAY, N. R Notre Dame, Univ. of 61/12/21 lp
BOO702O612 Forwards. IE Bulletin BO-15, "Possible LOBS of Emergency
Notification Sy s (ENS) H/Loas of uffsito Pouier " Written
rospon-si? requiroiT
QRIER.B H Regian 1, Ph 1 1 ad elpti IB. Office of the Director
BO/06/ IS lp
BOO715012Q Ack receipt of HOOtll Itr informnvg NRC of steps taken to
correct violations noted in IE Insp Ropt 7Q-0364/79-24
HRIER.D H llegion 1, Philadelphia, Office of the Director
BO/Oi/19 lp
— BO07I50I39 Responds to NRC B00115 Itr re violations noted in IE Insp
Rupt 70-0364/77-24 roTfectivc actions justification
submitted re none omp 1 iance
AUSTIN.tl ft Qabcock ^ Wiltoi Co , Nuclear Material Dlv 00/Ofc/ll
DOCKET 70-O364 PAR KB TOWNSHIP SITE, BAuCQCK b WILCDX CD
B0071B0009 Forwards application for amend to License SNM-414, canalstlng
of revised pages to Chapter 3 oP license re Bite b
facilities description
AU8TIN.M A Babcock S, Hilco* Co , Nuclear Material Div BO/05/09
BO071S0914 Applicotion for amend to Lieenss BNM-414, conilsting of
revised pagoa to Chapter 3 of license re site fr facilities
description.
* Babcock t< Ullcox Co , Nuclear Material Dlv 60/01/30, ZOpp
-8007150141 Ark receipt -of 7"?13Q3 Itr informing of corrective actions
taken re IE Inop Repl 70-0364/79-24 Requests written
statement re Item B including Cbrructwe stopa t^lten ti date
when full compliance ulll be schiuved
QRIER.B.H Region 1. Philadelphia, Office of tlie Director
BO/O1/15 2pp
-BO071501')H Providos specific resfonses !• corrective actions re
disclosed items resultina Prom IE Insp 70-0364/79-24 on
790?34-2B Routine surveys of MiiLlcar Matls J< Hfg Dlv vault
area being performed t< cited organizational changes tiegun
AUBT^N.M A Cabcock & Hiltoi Co , Nuclear Material Div 79/13/03
4pp
B007140M4 Forwards IE Inap Rept 70-0133/BO-OB & 70-364/BO-07 on
BOQ303-20. No noncompliance noted
HA«TIN>W 0 Reoion t, Philadelphia. Safeouards Dranch BO/05/21
-B00715O13O ForuiapdB IE Insp Flop t 70-036-1/79-24 on 790924-SB !< notlCo
viol ation
BHITH, 0 H Region 1. Philadelphia, Fuel Facility t. Hater lain
Safety Dranih 79/ll/OB 3pp
-B0071501SA Notice of violation from Insp on 79093-1-29
« Region 1. Philadelphia- OffiLe of the Director 79/11/Of.
342
DOCKETED ITEMS
— EH) 07 ISO 163 IE [nsp Rept 70-O364/7-?-2'» on 710C?24-2B Hone ompl lance noted
failure to piescTibe spe-cial measures to control personnel
dose to radiation in vault & failure to have written
evaluation For or gani 1 ati nna 1 change
CROCKER. H W Region 1. Ph 1 1 ade ] p tua. Fuel Facility t, Material*
Safety Branch HOTH, J Region 1, Philadelphia, Office of the
Dtrettor 79/11/06 IBoP
BOO71fc07eO Foruards IE Circular BOM4p "Radioactive Contamination of
Plant Demineralu-ed Wator <3ij 5 !. Resultant Internal
Contamination of Pp-rBomiPl " Nn written response re-quired
, B H Region I, Philadelphia, Office oF the Director
Ip
B007aiO109 Responds to BQO6IB mooting" re decommissioning b
tfacontamin«it i on of facility NRC mil nob proceed ui/revleus
of 800329 fundamental nuclear ma 1 1 control plan for License
SNM-414 Revised plan Pipetted by SOO731
PflRTLGM, J Q Material Control Licensing Branch BO/07/O3 Ip
BO-O721OO9S rtdviaes licensee that NRC will refund portion of fee paid
Far rewieu fc approval of B00212. 0318 & 0413 applications for
license amend License Condition 312 uae added to Amend
MPP-t to License SUM— 114 on B00604
MILLER, W D License FBB Mcno(|c-mBnt Branch BQ/O7/10 Ip
Rssponds to BOO 63 A request for- reduction In number of
nondestructive dsang sttls to be maintained during
decommissioning Three stds are sufficient for calibr !<
Control nf nond BEtrut 1 1 ve measurement sgs
PflDTLOW. J S Material Control t- leant ing Branch BO/07/1A Ip
BO07230Q53- Requests notification of appro meeting data to ditcusi
status of possible scrap recovery contract botueen NRC fc
facilities NDC has propoo-sd rtug or Sept 1990 meeting date dn
Si Iver Spring, MD
PAflTLDN.JO Material Control Licensing Dfanch 80/07/13 Ip
DOCKET 70-0399 COHMEPCE, DEPT OF
BOO7160B31 Foruards IK Circular 8O-14, "Rad ioactl v» Contamination of
Plant Deminural lied Mater Sg s & Resultant Internal
Contamination of Personnel " No written response required,
CRIER, D H Region 1, Phllad elp hiflj Office of the Director
BO/06/H4 Ip
DOCKET 70-0474 UP9ALA COLLEGE
B007310391 Notifies of eipirud. License SNM-430 (c dlscu.sei nction* to
be taken by licensee
CROCKER. H M riugion 1. Philadelphia. Fuel Facility t< Material!
Safety Branch BO/OH/07 Spp
DCKKET 70-O57S MONSANTO RESEARCH CORP
GO07030476 Aifvisei that request far oiemption to riduca allowable
iao topic concentration of Pu-23B from BOK to 7BX has timtn
granted
BURNETT, R F Di vision of Safeguards GO/Oi/17 Ip
DOCKET 70-O37I DM TED N\JCLEA)( CDFIP
DOCKET 7O-0633 HQWARD UN IV
80D7B3OII1? Forwards IE Insp flept 7ft-O371 /BO-OB on BQQ51H-15 No
noncornpSiance noted
MARTIN, W & Region I, Philadelphia. Safeguards a ranch SD/06/U
Sff
— H007230IEA IE Insp Ropt 70-037 1 /9O-OB on aQ031&-19 No none amp 1 ianc e
noted Major areas inspected licensee action on previous
insp findings 8c records t, ropta
WDLTNER. E . jaYNER,J H Region lj Philadelphia. Safeguards Drancn
BO/OA/O9 Ip
B0070206I7 Forwards IE Bulletin BO-15, "Possible Loss of Emergency
Notification Sij s <El^ MVLass of Offsite Power " Uritten
r-esponae required
BRIER, D H llec-inn 1, Ph i lane 1 phia, Office of the Director
BO/O6/1B Ip
000714,0946 Forwards IE Circular BO-14, "Radioactive Contamination of
Plant Daminerali j«d Water Sys it Resultant Intel-rial
Contamination of Persnnnel " No written response required
GJ1IER. C H RegtDii 1, Ph i 1 arie 1 phia. Office nf the Director
Ip
BO071B005a fltk receipt of SOOfil-O Hr inrorjnlnfl NUC of step! taken to
meet commitment pur IE Irisp Rept 7O-O371 /BQ-Oi
MftrtTIN M O Region 1. Ph tlarte 1 phi a. anfeguaTde Branch BO/Oi/B7
BO07D101BO Ack receipt af B00125 1 tr informing NRC of step* taken to
correct violations noted in IE Insp Repta 30-11063/80-01-
30-01321/60-01, 40-67B7/80-OI i. 70-0633/80-01
SMITH, 0 H Region 1, Philadelphia, Fuel Facility I, Mattrlali Buf.tij
Branch BO/OS/SB Ip
— B00701OIB5 FlespondB to NtlC H0032B 1 tr re violations noted in IE Imp
Repts 30-II063/BO-01,30-013ai/BO-01,40~67B9/BO-01 (.
70-OAa5/BO-01 Corrective actions effluent concentrattoni
BVnluated i CF-S33 source tested
ALEXIS, C P Howard UniV QO/04/23 Spp
— 8007010197 Discusses IE Insp nepta 30»1 1043/80-01, 30-01 33 l/BQ-01.
40-^767/00-01 b 70-0625/50-01 on B00320-21 (, faruardi notice
of violation
BMITH. 0 H Region 1. Philadelphia, Fuel Facility t. MntirimU
Safety Branch BO/03/2B Hpp
— 8D07O10209 Notice of violation from insp on 8 00320 -HI Noricoup lUnct
noted, fallurti to conduct renulrad survHy«,Cf-a3a source
stored in unlocked room b fond stored In refrigerator u/
rod ioi sotupea
* Region i, Philadelphia. Office of tht Director GO/03/3B 2pp
DOCKET 7O-06BV UNION CARBIDE CORP
— a0071flOOte. R&9ponds to NFJC BO053O 1 tr i-& coniml tment mads In reeponse to
EE Insp Rept 70-0371/HC)-Oi Corrective actions attached form
use-d to record iBcelpt of bottles of sludge W/o form
QflNLEY,D C United Hue 1 car Corp .Naval Products Div BO/06/10,
0007030311 Reports completion of criticality revliu of B00t02
application Rocammcnds that nuclear crltUallty saFetij
aspects of application be approved
PAGE, R O Uranium Fuel Licensing Dranch BO/Oi/19 Spp
0007180071 DisrussL's IE Jnsp of LiconflO SNM-360 A foruarde IE Insp Rept
70-0371/60-06 on BO0407-11 !, J4-1F) No noncompl 1 ance noted
MARTIN. W O Region 1. Ph i 1 ade 1 phiHj SaF«guards Branch BQ/03/2O
3pp
BO07160B49 Forwards IE Circular BO-14, "Radioactive Contamination of
Plant DumlneraJ tied Water Sys A Resultant Internal
Contamination of Personnel " No written response required
CRIER, B M Region i, Philadelphia, Off leu of the Director,
BO/Q6/24 Ip
— S007iaOOB3 IE Insp Rept 7O-0'37I.'80-0& on B00407-11 & H-1B No
noncomp I iance noteJ Major areas fos-pecte-d inventory
vcrific-at ion. reconc i Hation, m-t.-iBurement li statistical
control Detaila uiithhelij (ref 10CFRS 790)
JDVNERj J H . DIS'SFTI.P Regmn \, Philadelphia! Be Psguard* Branch
HOUODV.o Deoion 1, Philadelphia. Office of the Dimeter
BG/03/13 Ip
B007380O9O Motifi&s that 800616 request for amend to License BNM-36B
requires fee
WEISS. D Licon&e Fee Managnmpnt Branch BO/O7/O3 Ip
B007350363 Hotlfiea that BoOe>2i request ^e shutdown E- scrap prcjcBBilnn
has boen classified as minor amend to License &NM-36B Minor
amand fee IE requir-ed
License Pee Manaoement Dranch £10/07/08 Ip
B00721oaB9 Aek receipt of B00520 it-p Informing NRC of step* taken to
correct violations noted In IE ln*p Rept 70-06B7/BO-03
DRIER, D FUglon 1. Philadelphia, Office of the Director, 80/06/30
IP
— 8007210393 Responds to NRC B004H3 Itr re violation* noted in IE Insp
H»pt 70-O687 /aQ-03 Corrective actions will maintain air
samp 1 Lng records
MCODVERNj J J Union Carbide Corp BO/05/SO ip
— 9007310295 Poruiai-ilB IE Insp Rept 70-06B7/BO-Q3 on 800327-29 {< notice
of violation
SMITH, 0 H flugion 1, Philadelphia, Fuel Facility & Material*
aafetij Dranch BO/04/33 2pp,
343
Notice of violation from Imp on B00327-29
ft R«glan 1, Philadelphia, Office of the Director 80/04/16 lp
— «8O7B1O3O4 IE Imp Rtpt 79-0687/90-03 Nonconpl iance noted failure to do
biafittay *> maintain record* In proper unit*
CLBHON8. P Region 1, Philadelphia, Office of the Director
HNAff.P. Region 1. Philadelphia, Fuel Facility %, Material* Safety
Branch, BO/04/ 16 7pp
8807310074 Notifies that 791197 request for route approval involving
spoilt funl ihipaant frod TuxedcuNY to Savannah River
raarocB*«ing sitd in SC 1* *ubj to license fee schedule
Reviou conflicted an BOO3O3
KILLER, M 0 License Fee Management Branch BO/07/03 lp
6007230148 EN-BO-012A on B00711, order imposing civil penalty of il.OOO
Mi liiuad.Aftir consideration of licensee response, IE
concluded that one ltej> of nonconpliance did occur
BROCKtTTr. T U . THOMPSON, D Office of Inspection !< Enforcem»nt.
Office of tho Director BD/O7/11 lp
BO07300038 Ack receipt of BOO 423 Itr In response to NRC BOO 107
notice of violation & notice of proposed imposition of civil
panalti** Also forwards order imposing civil monetarg
penalty,
8TELLO,V. NRC Region*! Offices 80/07/11 3pP
—8007300040 Order l«po*lng civil monetary penalty re noncomplianc*
noted In 1C Insp of facility on 800102-39 App A. evaluation
ti conclusion encl
8TEU.O, V, NRC Regional Office* 80/07/11 9pp
BOQ7S90161 Forwards NRC 800922 fue request for review nf physical
protection plan For 5NM of moderate strategic significance
Requests payment within 15 if ays
WEI8B, D License Fae Management Branch BO/Q7/I6 Ip
DOCKET 70-0320 UNITED NUCLEAR CORP
8007830186 Forwards IE Insp Rept 70-0520/80-06 on 80O313-13 No
noncompliance noted Cover sheet only encl (ref 10CFR2 710)
MARTIN, H O Fteaion 1, Philadelphia, SafeBuflrd5 Branch 80/06/17
3pp
— H00725O494 IE Insp Rept 7O-08SO/80-06 on 800313-13 No noncomp 1 iance
noted Major areas Inspected organi lation, shipping t>
receiving, measurements t, statistical controls Details
Withheld (ref IOCFR2 77O)
COHEN, I , ZIBULSKViH , JQYNER. 0 H Region 1. Philadelphia, Office
of the Director 80/06/13 lp
8007020633 Forwards IE Bulletin 00-15, "Possible Loss of Emergency
Notification Sys <eN9) WVLoss of OPfsite Power " Written
response required
GRIER.B H Region 1, Philadelphia, Office of the Director
00/06/10 lp
8007160945 Forwards IE Circular BO-14, "Radioactive Contamination of
Plant Demlnerali led Mater Sys b Resultant Internal
Contamination of Personnel " No written reaponso required
ORIER.BH Reoion 1, Philadelphia, Office of tha Director
BO/06/24 lp
B0072B0101 Returni chick which accompanied B00707 Itr Fee for «ame
1-ea.uatt u«« received on BOQ419
i D Licenie Fe» Management Branch, 80/07/17 Ip.
DOCKET 70-0734 OENERAL ATOMIC CO.
SOOTOlOaW Attvieei that fee far approval of highly tnriched U thipmint
hai not b«»n received
Licente Fee Hanigenvnt Branch BO/06/10 Ip
B007030O09 Forwards IE Bulletin 80-19, "Po*«lble Lots of Emergency
Notification Su* (ENS) H/Lo*« or Offiit. Pouter " Written
r«»eon»« rtquimd,
GNOB-KEN. R, H He j ion 9, Ban Franci*co, Office of the Director
80/tW/lB tp
<to0734007A Reipond* to NRC BOO424 ilte-ipecl f ic quaitions r> detain of
' »B,*lc«J protection sy* Reipanie uilthhuld (ref IDCFflS 790)
, C W Phyiical Bequritg Llceniing Branch BO/06/SO Ip
B0071B0874 Forward! IE Circular BO-14, "Radioactive Contamination of
Plant D**tlneraliied Hater 8g* ti Reiultant Internal
lon of Perkonnel. " No written raiponae required
H. Region 3, San Fr»nci*co. Office of the Director
9007330081 Raq.UBBti T»*olution of outstanding f" lnu«t for certain
•hyitc'l *ecurlty-relat«d documonti ti emergencij plan* Memo
dtd 790910 re 79092O guard training plan tubmitted by OA Co
never aniwered
MILLER, U, D Licenia Fee h»naoem»nt Branch BO/07/16 Bpp
DOCKET 70-0794 VALLECITOS NUCLEAR CENTER, OENERAL ELECTRIC CO.
B007B4O072 Rupondc to B004Q1 Itr requesting change to spent fuel
route approved by NRC 800417 Itr Proposed change ha* bein
reviewed t, approved Attachment to B00421 ulthheU
(r»f lOCFRa 790)
HCCOnKLE. 0 W, Phyiical Sicurity Licencing Branch BO/04/3O lp
8007180309 Forward* IE Circular 30-14, "Radioactive Contamination of
Plant DvMlneraliied Mater By* t Resultant Internal
Contamination of Personnel " No uritt*n responte required
ENCELKEN, R H. Region 9, Ban Francisco, Office of the Dimctor.
BO/Oa/34. lp
0007170631 Notlfie* that 791 EBB rvquett Cor route approval Involving
•pent fuel shipment from Materford.CT to Pl»a«anton, CA ii
•ubj to1 CommiBi ion licence fee *ch*dule Review completed on
800417.
MILLER, M. 0, Llc*n*> Fee Management Branch 80/07/03 lp.
B007210106 Requests payment of minor ssfeguards amend fee In connection
UI/B00636 request For metnjition frnm requirements of
10CFR73 SO, 73 43 !. 73 46 Request has been classified as
requiring minor amend to License SNM-777
UFI6B, D License FBB Management Branch BO/07/OB If
DOCKET 70-0834 DABCOCK & HILCDX CO
BO0701000b Foruards replacement pages to BAW-331 for License BNH-77B
Encl respond* to NRC questions arising from 800218 request
to amend license to allow canst t< use of temporary uaste
storage facility
DLSEN.A F Dalicocv !< Wllcoi Co 60/03/25 Ip
— BD070IOO1O Replacement pages for CAW-MI, "Demonstration ti Condition*
for License SNM-77B, " May 1970
« BabcocV t. Wilcoi Co BftH-318 A12 RIO 70/03/31 7Pp
— 8007030350 Replacement page for DAU-381, "Dsmonstration tt Conditions
fur License BNM-77S. " Dec 1979
* Oahcock tt Wile 01 Co QAVJ-3B1 7B/12/31 <?pp
B007150B37 Lists costs incurred & man hours expended in review of B0021S
application (. B 0032 5 J. 0408 suppls for amend to License
SNM-778
KETZLACH.N Uranium PUB! Licensing Branch 80/03/30 lp
B 0070303 37 Foruiards proposed license conditions t< comments on license
rnneuial application W/o end
CHDH,W T Uranium Fuel Licensing Branch BO/06/10 3pp
B007010293 Requests cxtonsian until 800701 to satisfy Item 3 of Insp
Rept 70-OB34/BO-01 Required forms, re haiardous matlinot yet
received fr<im printer
OLBENiA F. Babcock t. Wilcoi Co BO/06/13 lp
— 8007010393 ForuardB IE Insp fiept 70-OB24/H0-OI No noncomp 1 iance noted
HENNA, U 0 Region 3, Atlanta, Safeguards Branch BO/05/H1, 2pp
--8007010301 IE Inap Rept 70-D8S4/80-01 on BOD439-0503 No noncompl lance
notod Major areas inspected facility changns & mods,
operations revieu, fol louiup an unresolved Items t. Pollouiup an
Items of noncompliance
KAHLE-J D Re) ion 2. Atlanta, Office of the Director KENNA,M B
Region Hi Atlanta, Safeguards Branch QO/03/19 7pp
B00702O733 Forward* IE Bulletin BO-13, "Possible Loss of Emergencv
Notification Sys (ENB) U/Loss of Dffaitc Pouer " Written
response required
O'REILLV.OP Reoion 2, Atlanta, Office of the Director. 80/06/16
8007280027 Notifies that amend fee is required for 800630 reo.u«*t re
ute of 8NM outside *«curad area*
WEISS, D, Licenxe F«« Managiment Branch BO/07/09, lp
B007170149 Forwards IE Circular 80-14, "Had inact ive Contamination of
Plant Demlneraliiedl Hater Sys t. Resultant Internal
Contamination of Personnel " Ho written response required
Q'REILLY.J P Region 2, Atlanta. Office of the Director QO/06/24
lp
BQ07aiOO3£J Notifies of fee required for revieu nf 791303 request for
route approval for shipment of spent fuel assemblies From
Lgnihburg Research Ctr to Dcanoe Nuclear Pouor Station
MlLLEff, W 0 License Fee Management Branch BO/07/02 lp
B007290ii'lB Forwards revised NUREG-O'S&l amending Interim rule far
physical protection, of spent Fuel in transit Addl areas
have been designated as heavily populated Routes approved
for BiW one 1 New re-quiremonta apply B00703 M/o oncl
HCCORKLE, G U Physical Security Licensing Branch BO/07/03 lp
DOCKET 70-0904 PACIFIC NORTHWEST LAB
B0071802Q3 Foruanfn IE Circular 00-14, "Radioactive CUntaninaJ^lan
Plant DBmlnerflllied Hater BV« a Re«ult,»nt Internal
Contamination of Personnel " No written response required,
ENCELKEN.R H Re|)ion 9l BaT) Francisco, Office of the Dlrnetor
HO/Oi/24 lp
DOCKET 70-0997 HEBTIKGHQUBE ELECTRIC CQftp
0007100338 Discusses IE Insp nap* 70- 0997/00-01 conducted on BQOAOA We
noncninpliacice noted Major areas InBpecbed. selective
examinations of procedures It r»pr«t*n t»tiv» r«cordsi
interview* m/personnel b onaaureiFunts by Inipector
rtlNNEMAN.J D Raglan li Philadelphia, Flint Facility * Matarlalo
. Safety Branch BO/Oi/30 lp
DOCKET 70-0925 CIHMrtRON FACILITY, KERR-MCGEE CORP
BO0717030D forward's IE Insp Repta 70-O93S/BO-02 t- 70-1193/80-02 on
BQ0407-Q9 !. notice of vic-latinn
DAVIS, A D Region 3, Chicago, Fuel Facility & Materials Safety
Branch BO/06/I6 Spp
— 8007170305 Notice of violation Prom Insp on B00407-OB
» Re.'0ton 3. Chicago. OFfico aP the Director GO/06/13
— QOO717O310 IE Insp Repts 70-0921/BO-O2 J. 70-1193/80-02 on 000407-00
None ompl Jance noted empty, open 53-gallon drums wire fnund
In tuaste shipment storage Boom 131
DUBHV, N E Region 3, Chicago, Office of the Director FISHER, U L
Rogiun 3, Chicago. FUB! Facility (, Haterialfi Safety Branch
BO/Ob/12 lOpp
30-07030033 Forwards IE Bulletin DO- 15, "Possible Loss of Emergency
Motif icatinn Sya (ENS) W/LoB9 of OfFsita Pomor " Written
response required
KEPPLER, J 0 neginn 3, Chicago, Office of the Director BO/06/18
H007I10313 ForuardB IE Inep Ropt 70-0923/BO-04 on BOOilO-lS No
noncomp 1 i anc e noted
HIND, J A Region 3, Chicago. Safeguards Branch BO/06/33 lp
DOCKET 70-1062 TODD SHIPYARDS CORP.
8007240238 flBtponfl* to IE Bulletin 79-(9, "Packaging at Lou Lovnl
Raduaita for Transport & Burial- " No radwaiti hat hnin
geniroted over past 3 ijrs under Llcinis BNM-1013. Raduaita
generated under State of TX Llonifltt B-971 tt 0-1231,
W1NTERB.C E Todd Shipyards, 79/09/0^ lp
— B007H403flB Forwards IE Bulletin 79-17. "Packsfltng of Law Laval
Raduaste for Transport tt Gurlal " Bullitln rtqulrti action
of llcansee
SEYFR1T.K V Region 4, Dallas, Office of tho Director. 79/OB/tO
S00701O056 Responds to 8004EH memo by forwarding B0060? -Itr to Todd
Shipyards u/guidDline discrlCiing decontamination requiriMftnt
to bo met prior to termination of LlcBnii BNM-1013, State of
TX responsible for decantmnlnation re raduatte itor»(«
PAGE. R 0 Uranium Fuel Licensing Branch. 80/06/09 lp
— B00701028t Foruiards "Guidelines for Decontamination of FaelHtlot fc
Equipment Prior to fi*lea»u for Unrestricted U» or
Termination of Licenses Por Byproduc ti Source or BHH. "
nequlrementi do not apply to actlvltlit under TX lltante.
PAOE.R 0 Uranium Fuel Licencing Branch, BO/06/09 lp
— eOO7IJO51B IE Inap Rept 70-0925/BO-Ofl on B00610-13 No noncompl ianci
noted MajoT areas Inapeeted facility organization fc
operationj measureifiBnt & statistical details t> physical
InvBntoru BetalJs withheld freF 10CFR3 790}
HIND, J A Region 3, Chicago, Safeguards Branch PATTERSON. J P
Region 3. Chicago. Office of the Director BO/06/30 lp
B00717QBOO Foruards IE Circular ao-ifli "Radioactive Contamination of
Plant Demincral i led Hater By a *< Resultant Internal
Contamination of Personnel " No uritten response required
KGPPLER.J O Rpgion 3, Chicagn, Office of the Director QO/06/B4
IP
B00723062A Foruarda survey map inadvertantly omitted from IE In»p
Repts 70-01B5/00-02 tt 70-1 193/00-02 W/o encl
DAVIS, rt D Region 3, Chicago, Fuel Facility & Materials Safety
Branch BQ/07/08 lp
H0072B071O Foruarits aurveij map inadvertently omitted from IE Insp Hepts
7C--0?S3/aO~02 & 70-1193/80-02
DAVIS.A B Region 3. Chicago, Fuel Facility b Material* Safety
Branch 80/07/14 2pp
0007330549 Ac k receipt of 500697 Itr informing NRC of steps taken to
correct violations noted In IE Insp ropts
DAVIS. A U, Region 3. Chicago. Fuel Facility & Materials Safety
Drancn (10/07/15 lp
DOCKET 70-1100 COMBUSTION ENQINEERINQ, INC
BQ07QBQQ97 Ac* receipt of BOO3O3 Itr informing MRC of ttapi taken to
correct violations nDted In IE Insp Rept* 70-1100/80-02 h
30-03734/00-01
ORICR.B H nnginn t, Philadelphia, Office of the Dir«ctor
BO/09/30 3pp
-- B007020103 Responds to NRC 8D0417 Itr re violation* not*d in IE Intf
Repts 70-1100/QO-02 l< 30-03734/80-01 F*elllt« doet not
concur u/inspector opinion requiring response to IE Bulletin
79-19
LICHTENBERGER Combustion Englnvarlng. Inc BO/09/05, lp.
— B007020106 Forwards IE Insp Repti 70-1100/80-02 l> 30-O37M/BO-01 on
800310-12 No noncamplianc* Pouni) Certain aspects of
operation not conducted per IE Bulletin 79-1? nqulreMenti.
SMITH- OH Region 1. Philadelphia, Fuil Facility I, Material*
Gafety Branch 80/04/17 2pp
— 0007020121 IE Imp Repts 7O-1 lOO/SO-OH I. 30-037M/GO-01 on BOO310-1S
No noncompliance noted Major areas inspected' license*
response to IE Bulletin 79-19
nOTH,J Region 1> Philadelphia, Office of the Director.
CROCKER, H U Region 1. Philadelphia, Fuil Facility b Material!
Safety Branch 00/04/14 9pp
— 8007230564 Responds to NRC BOOild Itr re violation noted in IE insp
ropto Corrective action empty drums removed from Room 121
"'""''•"' " r-McGdB Nuclear Corp SO/Od/S? lp,
8007030107 Forwards addl infp supportini) BOO HI renewal
Certificate of Campllonce 9O22. par NRC B00301 rto.tie*t
Revised pages enc],
LICHTENDEflOER.H C-E Power Bijitums BO/Oi/Oi t,pp
ipplicatlon for
— B0070H0114 "Shipping Container "
e C-E Pouer Systems 7499-77603O,
79/06/13, lp
0007160840 foruarns IE Circular 80-11, "Radioactive Contamination of
Plant Demlneraliied Hater SIJB & Resultant Internal
Contamination of Personnel " No written responte requlrid
CRIER, D H Region 1. Philadelphia, Office of the Director.
80/06/31 1 p
DOCKETED ITEMS
B0072O0733 Ack receipt of BQOibOjb Itr Informing Hftc at ntepa taken tm
corroet violation noted in IE Insp Rapt 70— HQO/BO-O3
MARTIN, H.C Region 1, Philadelphia, Safeguards Branch BO/O7/O9.
— SOO73BQ737 He&pondg to NWC E0032a Itr -re violation notad in IE Insn
nipt 7O-11OO/BO-O3 Corrective act i on* * new sttfs will be
davulopBd for .aiaag math in a so range of values uill tie
n»a»ur*d uithin calibr limits
LICHTENBERGER Combustion Engineering, Inc. 80/06/06 Ip
— OOO738O743 Forwards IE Insp Rept 7Q-11OO/BO-03 on BOOfl2a~O3Ol «. rot It*
of violation. Notice of violation withheld <raf 10CFR2 7901
HAHTIN.U 8. Rftglon 1, Philadelphia. Safeguards Oranch 80/05/23
2pp.
IE Imp Rapt 70-1 IOO/8Q-O3 on 600128-0501 None amp I ianc
noted" failure to reject results autiide calibr range of
MBBvuranent nijc Dttalli withheld (ref 1OCFR3 79O)
COHEN, I > DELLA RATTA, A Region I, Philadelphia. Of fie a of the
Director JDVMER. J. M, Fusion 1, Philadelphia. Safeguard! Bran
BO/O5/19 Ip.
Advise* th*t quarterly reporting level UP 19 uCi of airborne
p» I- fc titillates was tucaotiai. During period B 00330 -O&3B. tota 1
quantitg dlschargst) UBB 22 23 uCi low enriched U Problem
attributed to under t i i*d absolute filter* Filters replaced
LICHTENBEROER, C-E Pouar Sgitems 80/O7/10 Spp
OD0729OOQ1 Forwards *un>niarv of BOG&17 mating re actions to dlspona of
radBMftte found In remiito Ideation on Utndsor site
SMITH, 0,H. Region 1, Philadelphia, Firel Facility & Materials Safety
Branch. ao/07/ll. Ip.
— BDO7270OO3 Buwmaru »* 800617 meeting u/C-E in Kins of PrustiaiPA re
actions to diipo-iB of raduaifce matl found In remote location
on Windsor «iti.
RQTHiJ Raglan li PtiilaifBlphIa> Offict of the Diractor BO/07/11
Spp
SO070701B7 Approver Amend 13 to License SNM-1Q97. revis i ng ccmpletic
date for aildl details o* decommissioning plan Detail? oust
be provided Ulttlin 9O daijs after publication of Hattelle
mode-l d B-canuni ssiaiiing plan
PAGE.R 0 Uranium Fuel Licensing Branch 80/06/34 Ip
— 0007070199 Baffetu. evaluation supporting e\meni 13 to License SNM-
reviaing [ompletion date for addl details of d Bcommi ssi ontno
plan
STEVEN30N.H L . CRDW.W T Uranium fuel Licensing Branch
OO/Ofc/24 2pp
B00717O19S Forwards IE Circular BO-14, "Radioactive Contamination
Plant Demineral 1 led Water Sij s & Resultant Internal
Contamination of Personnel " No uMtten response renuired
O'REILLV.J P Region 2. fitlanta, Office of the Director QO/06,
Ip
BOO7lfi071B Foruarda IE Insp Rept 70-1113/90-08 on BOOA17 No
noncom-p liance noted Dotai.lt ulthh?ld (re* 10CFR2 79D)
HENNA. H S Heoion 2, Atlanta, SdFeguards Branch BO/06/27 2p
— BO07160727 IE Insp Hept 70"! 1 1 3/ BO-OB on BOQ617 No no-ncompllanc e
Major areas inspected facility organkia t ion t mgt of matl
control iijs Details uithheld (rsP 1DCFRS 790)
HaDOEBtJ H . OlLLESPlf.F P Riroicn 2, Atlanta, Safeguards Brai
HO/Oii/29 1 p
8007080212 Responds to IE Qullotin 80-13, "Possible Loss of Emergei
Notification Sgs (ENS) in/Less of OffBitc Fouier " No
Bmergencif not t f icoti on S.IJE exists at Facility
KAPLAN.A L General Electric Co BO/06/30 Ip
300-7350673 Responds to requests fc-r changes to License SNM-1097r Am
MPP-2, Cond t fci an B 1 re fundamental nuclear matl control
plan Corrections % revised amends end Ends ulthhcld iref
10CFR2 710)
B Material Control Licensing Qrancfi 60/07/03 3pp
DOCKET 70-1113 OENERAL ELECTRIC CO.
DOCKET 7O-1143 MEST1NOHOUSE ELECTRIC CORP
80071SOOB7 Ack receipt of 0O01O? b 0413 Itrs InFormirg NFC of
tak*n to CDTrict vlalailoni noted In IE tn»p Dept
70-1113^80-03
KENNAiH. B, Region S, Atlanta. B«paguards Branch 30/O&/17
Ip
— BO0719O031 Provide* addl info r« violntions noted In IE Imp Rapt
7O-11 13/BO-O3, Corrsc tlv» actions: improved handling practice!
etpBcl*llu rt outgoing ewpt-u overpacti
KAPUAN.A.L Qintiral El»ctric -Co BO/06/13 7pp
—0007190O33 Ro*(tonds tc- NfiC B 00301 Itr r* violation* noted In IE In»p
W»pt 70-1113/BO-O3 Corrective actions- tral lor r«turn«d to
Htlnt-ngton nfg <dapt> corrac tty placarded & labtli affixed to
ovarpack »urfac».
KAPLAN, A L. Oenaral Elactric Co. SO/D4/D7. Bpp
— BO0719OO36 FOTwerrfii IE Imp Rept 7O-1113/BO-O3 on BOOI29-3O fc 0211-1B
i nntlce of violating
D'REILLV.J P Ho pi on 9, Atlanta. Office of the Dtrscter
BW03/04 3pp.
— O00719O043 Motit* of violation farm in»p an 6 00 IS 7-30 b 03U-1H
* Region S, Atlanta. Office of the Director 80/03/03 Spp
— OO07l1KKM<t IE In»p B»pt 70-11I3/BO-03 on H00129-30 & 0211-1E
Nancoinpllanca noted failure to properly lAbiti provide
placard* ti itaRcribB ITI ihlpplng document* ihlpmint of BNM
6TE6LE, P 14 , CLAY. F L Region 3, Atlanta. Office of the Director
KAHLE.J B Region 2, Atlanta, Bafeguardn Branch ao/03/OD E4pp
BOQ7O2Q732 Forward! IE Bulletin 30-15, "Ponlble LO»B of Entreincij
Notification 9gi (ENS) H/LomB of Offsite Pou*r " Hrlttsn
reiponca required,
Q'REILLV.J P. Reginn Z, Atlanta, Office ap the Director BO/06/18
&X7Q3QS3B Reip-ondc to BQOSSf Itr concerning NRC rvqucit for amend faa
for review of physical meuritij plan for BNM, Amend f«* i*
dui Upon con^letlon of i-oviow. cost will b» rtvieued tt ang
avirpa-ijment refunded:.
MILLERiU.D. Licenie FIB M»nas»m*Tit Branch BO/06/19 2pp.
— BO07O 30231 tHiciraBic inconilitencv of t** vchedulB. At*umtB that ticvnie
aeiand fee* would tie charaad for amandt inlt-tatad bij HceniDe
rathar than for nau or revi»Bd requlremsnti »et upon
llcani»a by NRC.
KAPUAM.A U, Oeneral El«rtrlc CD BD/O3/S9 Ip
eOQ7Q2O32-I Foruardf moderate GOEurltij plan suppl Suppl withheld
(rof 10CFR2 770)
DIPIAZZA.R P Weatinghooie Electric Corp BOfOS/SO Ip
3007020015 Ack receipt of BO 0438 Itr informing MHC of stqpo taken
correct violation! noted In IE Intp ffept 70-1 lfl3/BO-oa Ltr
to be withheld treF lOCFn^ 790)
MARTIN. U 0 (legion 1. Philadelphia, Safeguards Branch SO/03/B
8007020017 Forwards IE Imp Ropt 70-1 143/80-03 on 60022 6 -EB b nc
Of violation Notice of violation withheld (ref IOCFRS 79 O-)
KftRTIH.W 0 nealon 1. Phi J edolphi,!. Safeguards Dronch BO/O4
Bap,
B007030022 IE Insp R»pt 70-1143/6(1-05 on B0022&-aB Nn noncomplia
noted Failure to document testing & maint of sD-curitij-
rvlnted equipment Details withheld (raf 1OCFH2 790)
MADDEM.M ReBion 1- Philadolphla, Safeguarda Branch BO/04/C
8007310105 Forwards JE Insp Rept 70-1143 on 70-1 143/80-09 on B0081
No noncomp 1 iance noted
BMITH.O M Region 1. Philadelphia, Fual Facility J. Materials 3=
Branch HO/0&/09 2pn
--B007310190 re Insp Rept 70-1 1 flJ/BO-01 on 8QOS13-1& No noncamn 1 if
noted Major areas in^pecivd licon&ee action on previoui
Insp f indingsf oryani tatlon, nuclaar safety !i instrument
calihr tt safety committee activities
KINNEY.M M Region 1, Ph i Iflue 1 ph in, Office of the Director
CROCKER, HW Region 1, Philadelphia, Fuel FacilitiJ t, MaterU
Safety branch BO/Ob/Oi, I2po
I
B007O30ues foruardfi IE Bulletin BO-13, "Possihle Lots of Emero»nc
Notification Sui, (ENS) W/Losa of Off<* Power " Written '
response required
QRIER.B H (ieijion 1, Phil ndslphia. Pffico of the Director. |
Ip |
BOO71AO7BB ForuarilB IE Circular BO-14, "Hadioac Liv> Contaminfltlo)!
Plant Deminerali nod Water Bus & Resultant Internal ,
Contamination of Ppmonnpl " N» written response required '
ORIER.H H Region ). Ph 3 1 adel phla, Pffice of the Director i
BO/Oi/24 !p
1731Q2H7 Requests EiBmntion to requirements of IE Bulletin 90-13 ro
losslfjlB loss nf emergency noil ( iLation sy s ij/loss of
jfpaite poiuer Facilities being derontamintated Ho matl
ictivity underuiag or planned DEC ommi BS i omng set fnr 1983
•HJDRE.J 3 WeitinghoitiB Electric Corp BO/06/27 !p
J7230SBB Amend 19 to License SNM-1 120 authcrliins decontamination
i decommissioning of glove boies
IQUSE. L C Advanced Fuel t. Spent Fuel Licensing Branch 80/07/03
37290392 Informi of partial refund of Fee accompanging BQO6I2
application for *mHnd 19 to License SNM-112O
1ILLER.M D Licence Foe Hanagemnnt Branch BO/07/li lp
CKET 7O-U51 WESTINQHOUSE ELECTRIC CORP
D7100362 rt-ck receipt of 900401 Itr informing NRC of stops taken to
correct violation noted in IE [nap nept 70-1191 /BO-09
HENNA, W H Region 2, Atlanta, Safeguard* Branch BO/OV30 lp
S0071QQ37O Respond* to NRC 000313 Itr re violations -noted iiv IE Insp
Rept 70-1151/00-05 Corrective actions withheld
tr»F IOCFH2 790)
L VnniinghnusD Electric Corp QD/Q4/01 lp
B007100374 Formal-its IE Insp Rept 70-1151/90-09 nn BQ02I1-1* ti notice
of violation Notice of violation withheld <ref 1OCFH2 79CH
KENNA.IJ B Region 2. Atlanta, Safeguards Branch HO/03/I3 3pp,
aQ07IOO3Bl IE Irup Rept 70-MS1/HO-03 on BQOE11-13 rJoncompl iancs
noted N&A measurement control procedures Failed to describe
requirements fur reporting program data Details uiitliliold
(reP 10CFR2 770>
HATEB.O W Region 2. Atlanta, Office of the Btrector
G1LLESP1E.F P Region 3. Atlanta, Safeguard* Branch HO/O3/04
HQ071BG07B Ack receipt of 500339 Itr TO survey i< rvleata of 1,200 U
of molybdenum scrap. Release should not be made until IE
has had oppoi-tuntli/ to make Independent evaluation
CROW.U T Ui-anium Fi.cl Licensing Branch BO/O6/2H lp
DOO713DB1H Lists costs incurreij (, oianhOuT» oip&ndtd in revleu of 8OO'St4
application for amond to Licenait SNM-l 1O7
BHUH.E V Uranium Fuel Liceilsina Branch QQ/O&/2& Jp
BOO7BlOOtiS Ack receipt of BQ06S3 Itr Informing NRC Of itDpa takan to
correct violation noted in IE Inop Kept 7O-H51/OO-14
3TOHR,J f> Reuian 2. Atlanta. Fuel Tecilltu fc Maturlult Bafatu
Dranth flO/O7/Oa lp
— 8007210077 RespondB to NRC aOO£i06 1 tf re violation natid in IE Imp
Rept 70-11S1/BO-M Corrective actions first aid training
program scheduled t< attmded by shift luparviaon t
health phijaicE technicians
QDODHIN. W L . D'AMORE,H Uoitino houaB Electr-ic Corp BO/Oi/HS
-0007210052 roruiards IE Insp Kept 70-1151/00-11 on BOOS 19-23 h notictt of
violation
BTOURp J P Region 3. Atlanta, Fuel Facility h Mat trial* SaCttij
Branch HO/OA/OA Hp p
-0007210006 Notice of violation from insp on QOOBW-23
• Region 3, Atlanta, UPflce of the Director 30/Oi/Oi lp
-BQQ731QG13 IE Insp It e fit 70-1 1SIXBO-M on HaOS19-H3 Nonconpl lane* noted
failure to complete firat aid troininj for all shift
sujiervisars & health physics technician!
PERHQTTI.D J Region H, Atlanta. Office of fch« Director
JCHKIN8,0 R Red ion 3, Atlanta, Fuel Facility h Material* Safety
Branch BO/06/06 loo
DOCKET 70-1177 DftVIS k ELKINB CHLLEOE
IO&3O0293 Farmarils revlsod manualj "FuniJamentfll Nuclear Matl Control
Plan - Co.lumbi.3 Plant " Requeats approval Manual withheld
(ref 10CFR2 79O)
DIPIAZ7A.R P MestiTighouse Electric Corp , PHF1 Siistffms Dlv
flO/OS/OI lp
BOQ7BOQ2<)a IE Insp Findlnnn & Licetis" Ac k dtd QODA11 of LlcBnsa
SNH-111*? Insp Plndlngo nn nomcompliance noted.
DFiOHN, R A Region P., Atlanta, Office of th* Director QO/06/11
07020213 Forwards IE Insp Rept 7Q-1IB1/80-12 on BQ0413-IB No
noncomp 1 iance noted
KENNA.W D Region B, Atlanta, Safeguards Dranch UO/OH/OB 2pp
B00702&3aO IE Inap Rept 7O-U»1'BO~12 on B00413-1Q No noncompl i«nc»
noted Major area* inspected operation*, nucloar cri tic«l Itg
saf ety i internal rcviaw !< audi I, Faci 1 1 tij mods t< 1-OCFF121
programs
CDRYELL.O P Region S> Atlanta, Office of the Director
KAHLE.JU Region 2. Atlanta aafeguardi Branch 80/OS/oa 4pp
OOCKCT 70-1193 CIMftRRON TACILITV, KEFtR-MCOEE CDRP,
For wards site phgalcal lecuritij plan For approval Fee end
Plan withhold Ccef lOCFFiS 71Q)
DIPIAZZAiR P West InghOUEB ElBCLric Corp . PWR Sijatemi Dlv
BO/03 n 3 tp
Responds to E30O30V Itr to UC Rouse re chanjaa tn Cim»rron
• tandliy pdijalcal -leciiritu plan Changes do not dBcr«*se
of FattlvvneBi of pi on. b ore therefore being Inserted into
plan Encla to BOO « 09 Itr withheld (re-P 10CFD2 790 J
MCCQRKLEj 0 U Phijslcal Sccuritu LUansina Branch BO/06/02 lp,
H007170300 Forwari)» IE In*p Ropts 7O-Q9a3/BO-O3 *. 70-1193/SO-Oa on
0004Q7-GU E, nnticD of violation
DAVIQ.A n fluoioti 3. Chlcagu, Fuel Facility t, Mate-Mali Safety
Dranch QQ/Ot,/lh Spp
— 8007170309 NotiCB of vialJition from Insp on BOQ4O7-OB
* Region 3, ChiCflno. OFPlce of the Director 80/QA/12
IP
5070S0733 Forwards IE Dulle-tin BO^IS, "Pntallilo loss of -Eirnroancg
NotiFication Sys (EM3) M/Loss of DFfslta Power " Urltton
response rcq,uired
O'REILLV.J P Region S, Atlanta, Office of the DlrocUr DO/Oii/10
lp,
007O3002H Advises of issuance of Amend 9 tn SNM-1 lQ7i tin 1 etlnj)
requirement for gross beta analyses of- environ air
participates Table for Condition 39 replaced ui/«nc 1 tjibloi
PACE. R 0 Uranium Fuel Licencing Branch BQ/Qli/l'} 3pp
-8007O30028 Safety evaluation supporting amend to Llcenso BNM-1107.
deleting requirement for gr-ost beta nnalyiea for air
parti tula tsE
SHUrl,E Y , CROW.H T Uranium Fuel Licensing Branch aQ/OA/19
2pp
00717O141 Formardi IE Circular BO-lfl, "Had i o-active Contamination nf
Plant Demlneraltiird Mater By i ti Resultant Internal
Contamination of pprsonnal " Wo written response required
O'REILLV.J P Ruolon 2, Atlanta. Office of the Director BO/06/B4
IP
OO71BOB65 Foruiaras addl info supporting request For amend to UitflnsB
SNM-1107 to authome trse of SUM in advnnc&il inasle trFntmsnt
process Ltr l< aUJl info withheld <ref 10CFRS 790)
D1PIA7ZA.B P West in g house EloctrU Corp BO/Oi/BI app
--WOt 170310 1C Imp Kepto 70-01?a»/BO-O2 lc 7O~1 173/HO-OH on 800407-OB.
Nancompllanco nntod emp tij- op nn SS-gallon drums wore Found
in uaato -bhlprnant storaga Room 131
DURRY, N E RBQinn 3, Chiqaflo., DPPice of the Director FISHER, U U
Region 3, Chicnjd, Fu«l Fncilitij fe Materials Safety Branch
90/OA/ia lOpp
000703002:1 foi-uarils It- Dullntln BO-13. "Pon»lbl« Loss of EiMl-gencg
Motif Ication flys (EN3) U/LnB» af QPfslt* POUIBI- " Written
rimponse rcijuirBd
KEPPLER, J 0 Region 3. Cliliogo, OPPice c-P the Diroctor ao/06/IB
IP
O007I70HQQ ForuarJs 1C Circular BO-14, "Rarftaac tive Contamination of
Plant Dumlneroliioil Hater SIJB fc Hssulfcant Intnrnal
Contamination of Penonnnl " No urlttsn roBponse r»quir*d
HEPPLCRr J. 0 Region 3i Chi tag o. Office of the Director.
0007110673 roruiards 1C Insp Rvpt 70-1 193/80-03 on BOOJ.13-13
Ma noncotnpHanco nntltd
HIND, J A RBDiun 3. Chicago, SofeguardB Branch, HO/O7/OK
'P.
— ao07!10f.B3 IE Jnsp Ropt 70-1193/BO-O3 on 80061E-13 Mo noncomp llanc*
notBd Major nreoi inspected tiuclenr mafcl control b
accounting DutaiU ultnh-eld (ref 10CFRS79OJ A,«no™, ,D
HIMD, J A Heulon 3, ChitaBo, awPsBfa'-'ts Oranch PATTERSON, J P.
Regicin 3. Cliicago, OfPieo of tho Director BO/O7/01 lp.
347
(K1O7&9O6Z6 Forward* *urveu, ""P inadvertently omitted from IE Imp
Roata 7O-O9BS/60-02 & 70-1 193/BO-02 U/o end
DAVIS. A, B. Region 3. Chicago, Fuel Facility fe Materials Safety
Branch 90/07 /OB lp
800728O71Q For ward i *urvey nap Inadvertently omitted From IE Insp Rept!
TO-^OMS/BO-OH k 7O-U93/BO-02
DAVIS.A B Region 3, Chicago, Fuel Facility fc Material! Safety
Branch BO/07/ 14 Hpp
0007230949 Ack racaipt of S00627 Itr Informing NRC of steps taken to
correct violation* noted In 1C ln*p rept*
DAVI8, A B. Region 3. Chicago, Fuel Facility b Materials Safety
Branch. BO/07/15 lp,
— 8007330364 Raiponds to NRC BOOilt Itr re violation noted in IE insp
rapt* Corrective action empty drum removed from Room 151
StELLEY, M J Kerr-McOee Nuclear Corp BO/Oi/27. lp
DOCKET 70-1330 GENERAL ELECTHIC CO
B00717O423 Foruiards IE Circular BO-lfl. "Radioactive Contamination of
Plant Demineraliied Hater "iy* !, Resultant Internal
Contamination of Personnel " Nn written response required
KEPPLER.J 0 Region 3, Chicago. Office of the Director 80/06/2-1
IP
DOCKET 70-1253 EDL01J INTERNATIONAL CO
8007340090 Advises that request for 30-day ertenslon for submittal of
security plan has been granted Submission date is changed to
BOQ617
MCCORKLE.Q W Physical Security Licensing Branch 60/05/29 lp
DOCKET 70-1257 MIXED OXIDE FABRICATION PLANT. EXXON NUCLEAR CO . INC
BUCKET 70-1201 UF A CONVERSION FACILITY, BADCOCR b W1LCOX CO
BO0710O39O Ack receipt of 800421 Itr informing NRC of ittps taken to
corract violation noted in IE Imp Rept 70-1201/BO-04
KENNA.U. D Region 2r Atlanta, Safeguards Branch BO/04/30 lp,
~ 0007100377 Responds to NRC B00401 Itr re violation noted in IE Insp
Rait 7O-1201/BO-04. Corrective actions ulthhtld
(1>«f 10CFR2 790>
ZCFFiD W. Babcock Ic Hilcoa Co . Nuclear Material Div, BO/04/21
— B007100404 Forward* IE Imp R*pt 70-1901/80-04 on 800304-07 !> notice
of violation. Notice of violation uithtuld (rof 10CFR2. 790).
K6NMA, H B Region 2. Atlanta, Safeguard* Branch 80/O4/01 2pp
B007B40322 Forwards IE Insp Rept 70-1357/BO-O4 on BO0331,0401 & 22-33
No noncomp liance noted
DPQK.H E Region 5, Ban Francisco. Fuel Facility & Materials Safety
Branch BQ/O6/11 Spp
—0007340331 IE Insp Rept 70-1257/BO-04 on B00331, 0-101 !< 35-23 No
noncompl lance noted Major areas inspected Facility mods,
raduastB mgt t< Internal revieu d audit
COOLEV.N J , THDMAS.R D , BOOK, H E Region 3. San Francisco, Fuel
Facility fc Materials Safety Branch BO/06/10 7pp
B00703QOOB Forwards IE Bulletin BQ-13, "Possible Loss op Emergency
Notification Bys (ENS I W/Loss at Qffsita Pouier " Uritten
respansB required
ENQELKEN.R H Region 3, Ban Francisco, Office ut the Director,
80/06/18 lp
— 8007100410 IE In*p Rept 70-1201/BO-04 nn B00304-O7 Noncompl Unce
noted: failure to notify NRC of change mad* to matl control
ti accounting progr«M within sin months of change Detaili
withhold (ref 10CFR2 79O).
BATES, J. H , OILLE8P1E, F P. Raglon S, Atlanta, Safegu*rds Br»nch
BO/04/01 2pp
8007090183 Recommends endorsement of end review of estimate of relaate
of Pu from Euan nuclear mixed oxide fuel plant at Rich land,
HA as staff position & basis for succeeding increments oP
analycis of effects of natural phenomena on Pu fabrication
AYER.J E , BURKHARDT, U Advanced Fuel fc Spent Fuel Licensing Branch
HO/06/24 1 p
B00703036B Forwardt IE Imp Rept 70-1201/BO-06 on 800330-0404 Ho
noncaaallanc* noted
BTOHR, J. P, Region 2, Atlanta, Fuel Facility b HateriiU Safety
Branch. 80/09/07 2pp
—0007030370 IE Intp Rept 70-1801/HO-OA on B00330-0404 No noneompUanc*
noted. Major ori»» inipected. follouup on previou* ln*p
flndlngi, Internal b »Ktern(il e«po*ure contfol, re*piratorg
protection fc initrunent calibr,
MILLSAPiW J. Region 2, Atlanta, Office of the Director.
OIBBON, A. f. Raglan S, Atlanta, Fuel Facility ft Material* Safety
Branch. 80/03/O7 9pp
BD070aOOBO Revisn Licanie Canditloni 1 1,2 1,3,1,9,2 & B 1 of Lictnm
8NM-116B. Addi Llctnie Condition* 3 1 1 b 4 10 to Llcentv
Aetftnd HPP-2, authorli ing changes to pages of nuclear matl
control plan t quenptiani from 10CFR70
BURNETT, R,F. Phyilcal Security Licensing Branch. 80/09/89, lp
8007020725 Forwards IE Bulletin B0-15r "Pot»ibl» Lost of Emergency
Notification Bu* (ENS) H/Lon of Offsite Pouir " Mrltten
r««pon*i riquirad
O'HEILLY, J. P Region 2. Atlanta, Office of th« Director, BO/0&/1B
8007170144 Forwards IE Circular BO-14, "Radioactive Contamination of
Plant Daaiineraliied Water By* It Resultant Internal
Contamination of Penonnel " No written response rtqulnd
O'REILLY, J P Region 2, Atlanta, Office of the Director. BO/Q&/24
IB.
9007340106 Amend* Llcenie BNH-1168 authorliing revision of action level
for airborne concentration of radioactivity in fual-rod-«nd
wilding area d lic-uld effluent release Also add* dates of
BOO 109 fc 0&12 to Itam 9.
PAOE,R. 8 Uranium Fuel Licensing Branch BO/07/01 lp
— 8007240110 Divcusie* review of B00109 licenie amend application «•
800612 *Uppl. Recommend* Issuance of licens* amend
KCTZLACHiN . CROH,U, T, Uranium Fuel Licensing Branch BO/07/01
4BB.
9007310493 Add* llcen** condition* to Llcansv BNM-1168, Amend MPP-H re
uta of ltd* for mea*urement caltbr ti itorage of cartaln
MtU, in re*pon*e to B00i2i> r*o.ue*t for exemptions from
cod* requirement*,
' BURNETTiR. F. Division of Safeguard* 80/07/18 lp
— B0070901S6 "Increment of Analysis Estimoted Alrhorno Release of Pu from
Exxon Nuclear Mixed Oildc Fuel Plant at Fttchland.WA as
Result of Postulated Damage from Severe Mind d Earthquake
Haiard "
MISH1HA, J , SCHWENDIMAN, L C, AVER. J £ Dattfllle Memorial
Institute, Pacific Northwest Laboratory PNL-3340 60/03/29
43pp
BOO71B0304 Foruiaros IE Circular BO-14, "Radioactive Contamination of
Plant Demineraliicd Hater Bys b Resultant Internal
Contamination of Personnel " No urltten response required
ENQELKEN.R H Region 3. San Francisco, Office of the Director.
BO/06/54 lp
B007210310 Foruards DNWL rept, "Increment of Analysis, Estimated
Alrbourne Release of Pu from Enon Nuclear MiiBd Oxide Fuel
Plant at Richland,MA as Result of Postulated Damage from
Severe Mind t Earthquake Hazard "
ROUSE, L C Advanced Fuel E< Spent Fuel Licensing Branch BO/06/24
IP
— B007210319 "Incremont of Analysis. Estimated Airbnurne Release of Pu
From Enon Nuclear Mixed Oxide Fuel Plant at Richland.UA as
Result of Postulated Damage From Bnvere Mind & Earthquake
Haiard "
M1SHIMA. J , SCHWENDIMAN, L C Battel IB Memorial Institute, Pacific
Northuest Laboratory AVER, J E Advanced Fuel & Spent Fuel
Llcennlnfl Branch PNL-3340 80/02/27 43pp
B007240033 DUcusses IE Insp of License BNM-I227 on RODS13-16 No
nancompliance noted Major areas inspected selective eiam of
procedures & recordii intervi BUS id/personnel & observations
by inspector Details withheld (ref 10CFR2 790)
NORDERHAUG, L R Region 5, Ban Francisco, Safeguards Branch
SO/07/07 2pp
8007B100B9 Advises licensee that NRC ui t 1 refund portion of fie paid
for review b approval oP B001S3 application For license
•rnvnd License Condition 2 1 of MPP-2 to License SUM -1227 uas
revisetf on B0053O in response to application
MILLER. U D License Fee Management Branch 80/07/10 lp
BO072S0044 Returns payment dihich accompanied BOO/,19 request to amend
renewal application for Licnnsu 5NM-1S87 Request has been
combined ui/79Q531 renewal application
HEI5S. D Liconse Fee Management Branch BO/07/16 Ip
348
DOCKET 7O-127S PUOLI-C SERVICE OF COLQBftDO
6007290639 rnruarrls Endorsenont 52 to ANI Polity NF-192 !. Endorsement
45 to I1AELU Polity MF-69
GASCHLEFJ.J A Public Service Co of Colorado GO/07/23 3pp
3007220147 InterrDBatorles directed to intervenor Rorem et al-Rtquaita
identification of independent it employ ad »«p»rt ultnotian
intended to be called in license renewal proceeding
Certificate of Svc one 1
RODNEY, M A , SZWAJKOWEKI, R General Electric Co RODNEY, M A
Mager, Droun t. Platt 00/07/13 fcpp
DOCKET 70-131)8 HURRIS OPERATIONS. GENERAL ELECTRIC CD
lculations of
el lo
ge Estimates From
tion to coolers,
B00715OO57 Foruiartls
heat discharge at
in support of statements in E1A
CLAHK. A T Advanced Fuel tr Spent Fuel Licensing Branch
ao07O2O6Oa Fcrunrds GE 800-606 Icr to NMES re pi
room at FHC 1 11 ty
RODNEY, M rt Mayar, Hi-nun fc Platt BO/06/15
oposed addition to pump
IP
BOO722D16B Interrogatori is directed to State of IL Requests.
identification of all independent b employed eipert
witnesses intended to be called during hearingi Demand* basis
upon which contentions mere formed Certificate of Svc enel
RDONEY.M A . SZUAJXQ.H&HI.R U General Electric Co RODNEY, M A
Mager, Droyn (< PUtt 80/07/13 lOpp
80O722D170 Request for pTofluttinn of documtnti in form of notice
directed to intcrvenor Rnrom et al Relates to intorvenor
answers to GE Interrogator! es, basis of Content inn* Kb), 3 t
6 Si Intervenor intended testimony W/Certi Picate of Bvc
RODNEY, M A . SZWAJKQU5KI. FI Sen era! Electric Co RODNEY, H A
Mager. Brown d Platt BO/07/I5 3pp
— 8O07Q20c.il Forwarda sildl Info re proposed addition to pump roomi per NRC
791O04 request After completion of pro JPC ti appropriate
revision of NEDO-3133c.C. "Con sal idatod SAR" will be
submitted
M General Electric Cn BO/06/06 7pp
8007320015 Corrects 800719 BVC lint re NBC interrogator!!! directed to
intervenar Florem et al fc NRC Interrogatories 1 request for
production of document* directed to State of IL Document!
served B00719, aont via certified ma 1 1 , receipt requeited
ROTHSCHILD. M U Hearing Branch ( 80/O7/17 Ip
B007OIO573 Fnrmarda IE Insp Hept 70-130B/BO-O3 on 800530-Sa It nntico
of violation Nnfclce of violation withheld (reP 10CFRS 790)
HIND, J A Region 3, Chicago, Safeguards Branch 00/06/16 Spp
— aO07O1097B IE Inap Rcpt 7O-130S/BO-03 on B005PO-22 Nnncompl lance noted
soma vital barriers not properly maintained Details
uithheld IreF 10CFRS 7-7O)
CREED, J R , P1RTLE.G L Region 3, Chicago, Office of the Director
HIND. J A Region 3, CJiicago. Safeguards Branch DO/06/13 Spp
800717042,2 Forwards 3E Circular BO-14, "Rndioactive Contamination of
Plant Demincral i led Hater bgs li Resultant Internal
Contamination of Personnel " No written response required
KEPPLER, J Q Rpgion 3, Chicaoo, DFfice of the Director BO/06/24
B00714G038 Mefnar^ndum in oppositic-n to State of IL B00630 motion far
reconsideration of AELB 80Q&Q* order ruling on IL. B003a(l
contentions NRC BQOiCW interim pnlicg dnon not grant ABLG
jurisdiction to rev t DUI Close 9 -accident U/Certif icate of Svc
3IUAJKOHSKI.R , FiOHNEY.M A Qetieral Electric Co 5ZUAJHOW9KI, R
Hager. Brawn t< Platt BO/07/07 9pp
GOD7HQOD3S Summari; of B00610 rneptlnn v/QC in Silvor Sprino-HD re D00123
rcq,UBBt For license amend
CIAFIK.A T Core Performance Branch 00/07/09 3pp
B007320009 Foruai-ds NRC objections to State of IL B00711 notice! of
depositions & request for production of documents NRC will
not object to untimely motions i-f Filed durinn. di!cov«ru
phase
ROTHSCHILD, M U Hearing Branch 1 BO/07/1B Ip
~ B007S200I1 Response in opposition to State of IL B00711 noticBl of
depositions ft request for production of documents MRC
milling to discuss reasonable arrangements u/IL membtrji
itf/BpecialiieiF knowledge
ROTHSCHILDS U Hearing Branch L BO/07/10 App
6007230919 Advises Assistant Attg Oeneral that OE mill respond to all
Interrogatories tt document p-roductlon requests on BO OB 04 OE
reserves right to objnet to deposition of ang Individual Mho
ia not proper deponent Certificate of Svc end
G2WAJKDWSKI,R Mayer, Broun I> Platt BO/07/18 2pp
DOCKET 7O-1309 MORR1B OPERATIONS, BOURCI-3 b BTflNDARDS, OEHEHAL
8007170122 Forwards IE Circular BO-14, "Radioactive Contamination of
Plant Dnmineralized Water SU.E ti Resultant Internal
Contamination of Personnel " No ur-itten ruponup rvqulrnd
HEPPLER.JQ Rogion 3. Chicago. OJffUa Df the Director BO/06/24
BD07HO033 Reeponse in opposition to State of IL SOOi^O notion For
roc onslderatlon re Contentions f 6 1 1 & In support of motion
re Contention l(a) & request for c lari Fication Requests
addl discovery W/notite of rtppc trance !< Certificate Of Bvc
ORAY.J R Hearing Branch 1 BO/07/10 I7pp
B0071609S7 Notice of GE KcQrath of QE 600735 deposition in Chicago, IL
Requests production of tlocumpnts ti tangible evidence re
adapted content i cms,
SEKULEftj B N . SCOTT, W J Illinois, State of 30/07/11 Ip
8007130307 First set of interrogn torien directed to applicant Requests
identification »F omployeEB !< representatives ui/knouledge
about operation of spent fuel federal repository Certificate
of Svc enct
9COTT, U J , SEKULh.R.3 U Illinoia, State of BO/07/14 7pp
B007170315 Interi c-gHtories J< renuest fur production of documents
directed to inturvcn-or Rcircrn et fll Requests identification
of uiitnesBBE I. documents ro Contentions KbliS !< 6,
definition af torma a deacription of ftasis for allegations
GRAV. J R Hearing Branch 1 BO/07/13 I Spp
— 8007170220 Intovrnga torles Ji request for production of documents
directed to Srate of It Requests vleuis, posi tiuns on proposed
testimony on Contentions 1-7 Hi/witnesses intcndei! to 6e
called Certificate of Svc end
GFIAV.J R Hearing Branch 1 30/07/15 S3pp
DOCKET 70-1319 U B NUCLEAR, INC
B00702O733 ForuardE IE Bulletin BO-13, "Possible Losi of Enerflencg
Notification Sya <ENS) H/Losl of Off site Power " Mrltttn
response required
O'REILUY.J P Region 3, Atlanta, Office of th» Dlrsetor M/06/IB
IP
8007200330 Advlnoa that License ENM-1313 is terminated fc facilltiei b
equipment released for unrestricted use
, PftGE.R B Uranium Fuel Licensing Branch BO/06/19 Ip
— 0007380337 Discusses revleui -of US Nuclear, Inc request for termination
of License SHH-I319 81 release of facilltg fur restricted
US-B Recommends that license be terminated
SODNO. A L . CROW. W T Uranium Fuel Licensing Branch BO/OA/19
3pp
3007170131 Forwards IE Circular BO-14. "Radioactive Contamination of
Plant Domineral iied Water Su s & Resultant Internal
Contamination of Personnel " Mo written response required
Q'REILLY.J P Region a, Atlanta. Office of the Director 80/OA/24
IP
DOCKET 70-1333 METROPOLITAN EDISON CO
800752OtOB Raque^t fnr production of documents In form of notice
directed to State af IL Relate", tu GE interrogatories, State
of IL Contentions. 1-7. eipei-t u>tna69i>B' opinions !< State of
IL aOCtfSO second amended contentions W/Cept If icate of Bvc
3ZWAJHDWSKI.R . ROONEY.M A Opneral Electric Co SZWAJKDWSK1. R
Mayer, Brouin !< Platt HO/07/1H 3pp
80071100O? Responds to FD1A request For all indemnity aorBBm»nt»,
Insurance policies t, associated Info between util.NRC fc/or
AEC re facility Forwards documents listed in App A
FELTDN.OM Division of Rules and Records BO/06/S3 7pp
— B00711OO13 Foriiiardo Amend i to Indemnity Agreement B-64 H/o *ncl
H1LLER.J 0 Metropolitan Edisort Co 74/04/03 Ip
349
--B00711QO2O Foruords Indemnity Agreement B-64 W/o enc 1
MILLEK.J 0 Mitropolitan Edison Co 74/01/15 In
— 6007110022 Forward i •mind to indemnity agreement effective 74O301
rBflaeting «nend to 10CFR140, "Financial Protection
Requironanti Ii Indemnity Agreements " Amend increases
nuclaar energy liability insurance tn cno million
SALT Z HAN, J Atomic Energy Commission. Directorate of Licensing
74/03/08 Ip
— B00711OO23 Eincuted Indemnity Agreement B-64
SALTZHAN, J Atonic Enargy Commission. Directorate of Licensing
MILLER. J S Metropolitan Editon Co riNFROCK, I R Jenny Central
Power & Liont Co 73/ia/li ilpp
— BOO71100E4 Elttcutfd Amend 1 to Indemnity Agreement 0-64. chang ing amount
of financial protection
SALTZKAN, J Atonic EnBrng CoiMilssion. Directorate of Licencing
MILLER, J Metropolitan Edison Co 74/04/01 Ip
-8007170337 IE Insp Rept 75-O1 on 6D0916 of activities unfler Licenses
37-13139-01 & SNM-1554 Noncomfl 1 lante noted licensee eiceeded
license authori lation of 10 mCi of Co-60 in unsealed
sources
SLOHODIENrM J , MCCLINTQCK.R D Atomic Energy Commission,
Directorate of Regulatory Operations 69/C9/16 fo[jp
-8007170341 Discusses IE Imp 77-OI of Licenses 37-13129-01 & SNM-15S4
on 771129 Ho nontomD 1 lance noted Major areas inspected
procedures & representative records, interviews u/pei-sonnel i
measurements made by inspector & observations
MCCLINTOCK.R D Region 1. Philadelphia, Fuel Facility & Materials
Safety Branch 78/01/03 2pp
-Q007170345 IE Insp Rept 77-O1 on 77112-7 No noncompl ianc e noted Major
areas inspected organ! lation, internal nutf I tsP training &
employee instruct ions, ratfi nti on protection procedures, mails,
facilities !< Instruments !i receipt !< transfer of mat Is
HCCLINTOCK, R O Region 1, Philadelphia, Office of the Director
77/12/23 12pp
DOCKET 7C-ia»9 IRT CORP
e007i24O09S Amind 14 to License SNM-1403, ch»ng Ing expiration date to
at 1031.
PACE, R 0. Uranium Fuel Licensing Branch BO/Ob/26 Ip
—-80072401O2 Di»cu»«»t revliu of G00411 li cente amend application
RBCOH*»nds titending eipiration date to B11031
DELANEY'J C Uranlun Fuel Licensing Drench 80/06/36 2pp
DOCKET 70-14B7 ODQDYEAR AEROSPACE CORP
BOQ7170&33 For««rd« IE Circular 00-14, "Radioactive Contamination of
Plant Dantnir«lli*d Uatar Byi fc Resultant Internal
Cantwnl nation of Panonnol " No written response required
KEPPLER, J, 0, Region 3, Chicago. Office of the Director 80/06/24
DOCKET 7O-1733 PACIFIC OAS tt ELECTRIC CD
OO07S40282 Iliun Amend 0 to License BNM-1503. author! i ing USD of
nautrott sources t, gpsclfylng expiration dat» of 801231 or
dati of conversion of CPPR-30 to QL or uhithaver conies
narllcr
0 Uranium Fuel Licensing Branch BO/06/30 2pp
— BO07K40270 Discusses BOO108 « 0604 license amend applications
r«1u»*tina author! latton to store neutron sources t<
••ttnslon of license enpiration date Amend requests should
h« approvvd
DELANEV. J, C. , CROW, W T Uranium Fuel Licensing Branch BO/06/30
2pp.
DOCKET 70-1739 TRI-BTATE MOTOR TRANSIT CO
BO07D209OS Advises of approval of B00330 request for temporary amend
to BNM Security Transportation Plan II Vendor Itr to be
withheld <r*f 10CFR2 790)
HCCDHKLEiO M Physical Security Lleemlng Branch SO/06/07 Ip
DOCKET 7O-lBi9 RADIATION KANAOEMENT COUP
BO07 170264 Addl response to FOIA request for records cancerning Hittmin
Nuclear k Development Corp, RAD Svcsr Inc I. Radiation Mgt
Corp Forward! balance of documents <143 pages) listed In
*pp
FELTDN.J.M Division of Rules and Records 80/0&/Q2 2pp
-SOO7170349 IE Insp Hept 7B-01 on 7B023B No noncompl ianc o noted Major
areas inspected r ircumstances rtf loss t recovery of
contaminated resin drum, inc ludlng examination of nrocedures
(, representative records
C08TELLO,F , MCCLINTOCK.R 0 Region 1. Phi ladolphia, Office of the
Director 7B/03/06 Ilpp
-B007170407 Discusses Insp Rept 70-01 of Licenses 37-13139-01 fc SNH-1524
on 7B032B No noncompl iance noted Major areas inspected loss
d recovery of contaminated resin drum including eiamination
of procedures tt representative records
MCCLINTOCK.R 0 Raglan 1. Philadelphia, Office of the Director
7B/03/13 2pp
DOCKET 70-2000 MT BIWAI HDSP HARTFORD- CT
B007230397 Act receipt of B00611 Itr informing NRC of steps taken to
correct violations noted in IE insp of licenses 06-14734-01
& 8NM-1539 on 80042-5
KINNEMAN.J D Region 1, Philadelphia, Fuel Facility t, Matsriali
Safety Branch BO/ 06/2 5 Ip
—a 007230601 Responds to NRC B00527 Itr re violations noted In IE Insp of
Licensns 06.-14737-01 t, SNM-1559 on BOO'124 Correctiva
actions uill perform routine hand & radio pharmaceutical
preparation area surveys
BRUNER.R D Mount Sinai Hartford, CT BG/06/tl 2pp
— B00723060a Diacusses IE insp of Licenses 06-14734-01 t, 6NM-1S59 on
BQO424 t< forwards notice of violation
CROCKER, H VI Region 1, Philadelphia, Fuel Facility t. Materials
Safety Branch 80/09/37 2pp
— 0007230611 Notice of violation from inBft on B00424 Noncomp 1 iance noted
failure to conduct routine rndlnphdrmacelttical t< hand
surveys
« Region f. Philadelphia, Office of the Director GO/05/27 Ip
DOCKET 70-2153 UNITED NUCLEAR COKP
80072403B3 Resnonds to BOO633 i equeat for meeting ui/NflC to discuss
decommissioning of United Nuclear Corp Wood River Junction,
RI operation NMSB personnel will meet u/Qnvernor'E ofc on
B007O8 d attend public meeting later iti Charlestons, RI
AHEARNE.J F Commission (10/07/03 Ip
— 8007240309 Requests meeting ui/NRr to discuss concerns re developments
affecting operations at t< detommi saioning of United Nuclear
Carp Mood River Junction, RI operation List of questions
to be discussed end
GARRAHY.J J Rhode Inland, Stale of Bfl/05/23 Ip
-0007170322 Diicusses IE In»p 73-01 of activities under Licenses
37-13129-01 tc 8NM-1S24 on 751007 !< foruards notice of
violation
NELSON, P R Atomic Energy Commission, Directorate of Regulatory
Operation • 73/10/20 Spp
-B007170324 Notice of violation from inap on 751009 Noncompllance noted-
licensee possessed excessive amount of Co-60 in unsealed
sources
<t Atomic Energy Commission, Dime toT ato of Regulatory Operation*
73/10/20 Ip
DOCKET ?o-ai7s UNITED NUCLEAR CORP
B0072403B3 Responds to 800633 request for meeting ui/NRC to discuss
decommissioning of United Nuclear Corp Wood River Junction,
RI operation HMBS personnel uill meet u/Governor 's ofc on
B007OB J< attend public meeting later in Cliarlestouin, III
AHEARNE, J F Commission BO/07/02 Ip
— B00724Q3S9 Requests mpeting u/NRC to discuss concerns re developments
affecting operations at ti iecommin'ii oning of United Nuclear
Corp Hnod River Junction, RI opeiation Li«t of questions
to be discussed encl
OARRAIIYiJ J Rhode Islam], ^tatB nf BO/05/R3 Ip
350
DOCKET 70-2375 PACIFIC QflS !, ELECTRIC CO
3007330056 Notifies util that Luense SNM-144.7 is amended In accnrtfanc*
U/BOD625 application. Bilijnding eipiration date until 301231
or upon conversion of CPPR-t>9 to GL. wh ichever is earliar
PACE.R O Uranium Fuel Licensing Branch BQ/Ofa/30 lp
— 8007230063 Safety evaluation r* 000635 application to amend license.,
intending eipiration date until B01331 Eitension is needed
to complete remainder of NRC Facility licensing process
He-commends approval of application
DELAN6V.J C . CROW, W T Uranium Fuel Licensing Pranch BO/06/30
IP
DOCKET 70-3178 TRANfaNUCLEflR, IfIC
DistussB-s 900-403 aiti&nd .application for License OMtl-iBOZ
reiiiiDst ing Bitenslon of cipiratlun date until B10&3O
Recommcndi license ext«neion
DELANEY, -J C Ui-ani um Fuel Licensing Branch BO/Oi/13 *p
8007150092 poryardg IE Insp llept 70-3609/80-01 on BOO&24 Mo
noncomp 1 ia-nce noted
HIHD.J A Region 3j Chi-cagQ. Bafefluardi Brand) QO/O7/02 Qpp
— QOO713DO?i IE Imp Rept 70-26fl9/BO--O) on BO04E4 No noneontp 1 lance noted
Major aroat Inspected security procedures t orgtniia tlon>
previoua Items of n (incompliance £• c omnun Icati on Details
withheld fref 10CFR2 7701
PIRTLE.e L , KNICELEV, J R Region 1, Chicago. QffiKt, of thl
Director HIND, J A Region 3. Chicago, Safeguards Branch
ao/07/oi *ip
0007070003 Forwards IE Insp Hept 70-247B/BO-03 on C300417-1D fc 23-23
No noncampl lance noted
HENNA. W 0 Region P. Atlanta, Safeguards Branch BO/05/09 Epp
--OOO7O70D03 IE Tnsp Rept 70-2473/60-03 on BOQ417-19 6 23-E3 No
nontoimp lianc & noted Major areas inspected physical
protection of irradiated fuel in transit Detdlts withheld
(ref 10CFF12 770)
HQORE.DE Reg i an 2, Atlanta, Office of the Director
01LLESPIE.F P Regtan 3. Atlanta, Safeguards Branch 00/03^09
BOO 7 03000 4 Partial response to FQIA request For il oc Urn e n. t s rt
transportation of spent nuclear Fuel From Por tamnuth. VA to
Alten.E-C Forwards listed documents Other documents available
in PDR URC rev-leu of requifst 15 continuing
FELTON. J M Division at Ruin* and Records BO/06/B3 lp
— 8007030011 Confirms 800319 teUon re not I f ica 1 1 on of NRC TBnuiPtd bij
Condition 9 aF LIcunEe ISNM-Olfi^O
9TONEGURNEn. H Transmit IBBT, Inc BD/03/5B lp
--B007030016 ConFii-rfl! Q0031B tolcon TC notification of NHC rBqulred by
Condition & of License IENM-O149Q Pegas& Cask B contain* 36
Irradiated fuel elements ft It scheduled to acrive at
Portsmouth, VA on B0041&
STONE D URHE R, W Tr.tnsnuclear, Inc BO/03/16 lp
—6007030020 ConPirnii an BO0416 tclcon re notification of HRC required by
Condition 5 of License I ENh- 0 I fc9O Essor Flask contain* li
Irradiated furl flements '( la scheduled to arrive at
Portsmouth, VA on BOO3O-1
BTOhJEBURNER, H Trananu clear, I tic BO/OIJIA lp
BOO7310'1BI Response to FD1A rcqijpst far documents r« transportation of
Ipent fuel from Per tsmou t fi, Yi\ to Savannah River Plant In
Aifcen.EC Enc 1 Info partially uithheld saf ejoaT d-kng
jiroctduroa t, socuTlby measures Cref FOIA Eiemptlon 4)
FELTON. J H Division of Rules ani! Record* C0/07yaa 3pp
DOCKET 7O-3A33 MCOUIRE SPENT FUEL POOL. DUKE POWER CO
aoO7140461 Btatemint oF Board of Commit »lontr» ' position In oppoHtlon
to raduasba trarnpnrtation through Oafton Count g,t4C It ram
trarspor ta t ion via Interstate* 77 t B5 Enct>ur*n*a e>pcndlng
energy & moneij tar recycling W/corr-tepondencf
*• Oast an County, NC BQfQMSB t.ipp
— BOO714Ofl73 Forwards addl conunents to Q-aston County Board of
Commissioners' position opposing spent nucl-nar fuel ihlpaont
through county & tuo propo-ted alternate routes Author (fooi
not oppose ihlpmont IF adequate aafeguardR AT a pi-ovldtd
OA3TDM, H B Oaston County NC 80/04/B3 SpR
— HQ07MO4B8 Forwards position op G»*ton County Board of Comnimlonerit
MC, opposing spent nuclear fuel shipment thmuflh county ti
tua prnpoaed alternate routes H/o encl
HHVHE.-C A Oaaton Countij.KC 80/04/1S tp
BOO7180310 Foruiards response* to Paa»s 4~6 of 0»»ton Coicntu 8-oard of
ConinlasionBrs 800^33 questions adrfr«in.ei! to ftSLB rt util
application to trans POT ti store >p«nt fuel from Ocone*
Nuc I ear station
HDBE«TB.J p AdvantBfl Fuel & Spent Fuel Licensing Branch. 80/06/33
13pp
B 00723070 6 Foruiards response t& questions containnd In O00433 petition
docirnient Hesponses cohtern sa-fn transport Ei storage oP
cpe-nt fuel
RDEJESTB.J P Advanced Fuel b Bpetlt Fuel Lltendna Branch BO/Ob/39.
IZpo
BQO720CI043 ftcli receijt of 000702 1 tr Forwarding •pint fuol
transportation security plan, Reviaion 3 Request for propoied
primary route I a subj to fee Mill notlFy of amount
WEISS, D License Fee Manas"""it Branch BO/07/17 lp
DOCKET 7G-2(,51 MANCHESTER MEMORIAL H03P HftNCHESTER, CT
Confirms B0092Q t«lcon notifying M!)C that PUB-aa* C
contains 3d irradiated fuel olvments t< uiill arrive1 In
Portsmouth, VA Info partially uitlhlipld date nf- ai-rlval Irof
roirt Eiemptlon 4) NRC Pee determination end
STONEBURNER. W Ti-ananuc I ear . Inc BO/03J30 &pp
0007130314 Act rncaipt of 800227 1 tr informlns NRC of *t*p« taken to
correct violations noted In IE Rept 70-3651/00-01
CROCKER. H U Raglan 1, Philadelphia. Fuel Facility tt l"Ut«Ti«I»
Safety Branch BO/04,/ 1O lp
— 80073104vi Cnnfir/nft 300531 telcon notifying NRC that Pegase C'tk 1
contains one irradiated fuel element tc mill arrive lEi
Porlfimouth, Vfl Info partially uithnclit date oP arrlvallref
FOIA Exemption 4) NF1C fee determination enc 1
}, W Transnuclnar, Inc BO/03/S1 Bpp
DQCKET 70-2574 CARLISLE HOSP CARLISLE, PA
8007010397 DiscOB'sflfi IE Insp RaptB 30-00472/80-01,30-03018/00-01
70-S974/BO-01 on 9003H3 oF octlvltlB! under LUBnsC!
37-02383-01, 37-033B9-03 (, SNM-1762 No noncomp 1 lance noted
Major areas inspected air supply li eiheust si|5
CROCKER. H U Ruginn 1, Philadelphia, office oF th» Dinctor
BO/OA/03 3pp
— aOO715O319 Responds to NRC 800220 i tr re violation noted in IE Insp
Rfpt 70-3651/00-01 H/o end corrective actions
ABHOTT, VI S Manchester Krmorlal Houp Manchester . CT. BO/03/B7
BO071SD3S5 For-uards notice of violation From IE Insp Rept 70-2691/BO-01
on B002O7
HCCLIHTQCK<n D Region 1, Philadelphia, Fuel Factlltu It Material*
Safety Branch 60/03/20 Spp
G0071SO333 Notice of violation from imp on 80O207 Noncowp lUnci noted-
fallur-B to continua follouup on patient in whom pacemaker
Uffli Implantefl durlnj Jul 1977
* Region 1, Philadelphia, OPPice at the Dinttor 80/O2/20 lp
DOCKET 70-St09 CilUMHNWEALTH E»1SQN CD
H0070B0439 rtmenils -Liccnsfr BNH-IH02. n ^tund ing eipiratlon iUt
B10630 in response to util 300400 request
PACE.R C Uranium Fuel Licensing Brunch 60/OA/13 lp,
DOCKET 70-2930 CINCINNATI OA8 & ELECTRIC CO
0OO7O10ia9 Notifies util that Item A of License 8NM-iaS3 1* •minded
in accordance U/BO041O request Expiration date for license
is. extended until 811130.
PAQE.R.« Uranium Fue-l Uieenslna Branch 8O/0&/13 lp
DOCKETED ITEMS
351
— BO0701D190 Safety evaluation recommending approval of 00041O license
«nond application Application requests that eipiration date
far License BNM-1823 be eitended until B111O2
DELANEYiJ C . PAGE, fi 0 Uranium Fuel Licensing Dranch BO/06/13
lp
DOCKET 70-2860 SOUTH CAROLINA ELECTRIC t, QA5 CO
BOO73KM3B Application for renewal of License SNM-1B34
NICHOLS, T C South Carolina Electric t> Gas CD 00/07/28
DOCKET 70-2065 COMMONWEALTH EDISON
8007010094 Advises of Amend S to License 8NM-1833, eitendlng eipiration
date to 820331 or conversion of CPPR-100 to OL. whichever
ii air liar
PACE. R. O Uranium Fuel Licensing Branch BO/06/13 lp
— 9007010184 Safety evaluation supporting approval of util 600-103 request
to aitend License 8NM-1B33 to B2O331 due to const t<
licensing delays
DELANEYiJ C , CflOH.H T Uranium Fuel Licensing Branch 80/06/13
IP
DOCKET 70-2910 TENNESSEE VALLLY AUTHORITY
HOO702Q230 Notifies of usuante nf Amend 1 to License SNH-lBil,
increasing possession 1 imi t. author 1 1 ing USB of (ugh densitij
fuel storage racks fc incorpnrat ing specified organi rationa 1
changes
PAQE.R 0 Uranium Fuul Lict'nsing Branch BQ/06/17 lp
— 80Q7Q3O233 Safety evaluation supporting Amend 1 to License BNM-1BA1
Increases possession 1 unit, duthni i j KG uap of high density
fuel storage racks '. me nrporates specified organi lat ional
changes
DELANEY.J C , CRQU, U T Uranium Fuel Licensing Branch BO/O4/17
lp
PACKAGING OF RADIOACTIVE MATERIAL FOR TRANSPORT AND
TRANSPORTATION OF RADIOACTIVE MATERIAL UNDER CERTAIN
CONDITIONS
DOCKET 71-0003 CHEM-NUCLEAR SYSTEMS, INC
B00717O171 Requests addl info re QA program per 79O1S7 I IT Requests
reply uitlnn 30 days
MACDONALD.C t Transportation Branch 90/07/03 lp
DOCKET 71-0005 KAGNAFLUX CORP
DOCKET 70-2902 NORTH MEMORIAL MEDICAL CENTER MINNEAPOLIS, MN
8O0729OOS4 IE Insp Findings b Licensee Ack dtd BOO 609 of Lions*
UNM-1994 Imp findings no nancomplionce noted
BUROINiR E. Region 3, Chicago. Office of the Director BO/OVQ9
DOCKET 70-H909 HEBTINQHQUae ELECTRIC CORP POWER SYSTEMS
B007Oa(X>38 Ri«ponds to 800^09 re(iu«at for lUt of threatened d
*nd«ng*r*d ipiciti in vicinity of proposed plant Endangired
tpicle* moit likely to occur is American alligator
(aililiiippionil t >
HICKMAN.O.L Interior, D.pt of, Fish k MlNllft Service BO/03/22
app
H00702O044 Poruards OA program revised in accordance w/NRC BOOS09 1 tr
for Model MX-1C-1QO Biposurc device Response to NRC
MRC Q00509 questions re OA program end
HQQAUER, P J MagnaFlUi Corp (Subs of Peatody GaUon Carp )
80/06/12 4pp
— B007020047 OA program For Model MX-1C-100 Biposure Mevica
* Magnaflm Corp (subs of Peabody Oalion Corp ) 80/04/13
llpp
B007140706 Foruartfa QA program approval for r-adinaitws natl package
MACDONALD, C t Transportation Branch 80/07/01 lp
— 8007140707 QA program approval For radioactive matl package QOOSj
RevlBlnn 0
MACDONALD,C E Transportation Branch 80/07/01 lp
BO07020914 Foruardt camnents tr questions re environ rept per 800S21
rtiicuiRlon in Bilvur SpTing.KD Requmts that responses be
lubMittad by B00710 to maintain revleui schedule
BHUMiE.Y Uranium Fuel Licensing Branch 80/06/03 llpp
BO07010027 Reapondi to 9O0421 1 tr rnquesting scoping mvetlng to accept
addl public comminls on DES re proposed const d operation of
Hutinghouie plant Another meeting is not warranted, Required
• ip*n»a & effort mould not outuieigh any benefits
CROUiU T Uranium Fuel Licensing Branch BO fob/ 06 Sff
DOCKET 71-0017 RHODE ISLAND ATOMIC ENEROV CDMMIBSIOM
B00721011B Resppnds to Q 00 130 req.UBHt for add I inPa rs Oft program For
BMI-l shipping package !< forwards QA manual
DIMEQLIO, A F Rhode Island, State of 80/07/01 lp
— BO0721013D OA manual for DMI-1 shipping package
« Rhode Island. State oF BO/07/01 'f\ pp
BO0711QO03 Amindvd petition to Intervene & requnit for hearing re AL
nuclear fuel fabrication plant application Certificate of
Svci dBRignation-authoriiatlons in lieu of notice of
• ppmrance It board of directors resolution incl
CAMPBELL, R H, Bare Energy Alliance MCPHILL1PB, J rtcPhllllpn J L
80/06/11 ?pp
B007110093 Motion for order relieving petitioner from 20-copy
r«qutr«»ent In AL nucl«»r fuel fabrication plant
application proceed ing- due to limitnd resource* Certificate
of Svt encl
MCPH1LLIPB, J L Safe Energy Alliance MCPHILLIP5, J L
HcPhillipVi J, L. 80/06/12 2pp
BOO7O30291 Refponse in support of Safety Energy Alliance of Central
NLI Inc B00612 petition to intervene re SNM license
application for AL plant near Prattvillei AL Intervention
nust ba conditioned upon shoeing of common Interests
TURK, 8. E Hearing Branch. 1 80/07/02 13pp
— 8007030294 Reiponse in support of Safety Energy Alliance of Central
AL, Inc B00612 notion requeitlng relief from SO conformed
copiei filing requirement, Rocommends order containing
•pec of those to be serviced W/Certif Icate of 8vc
TURK 8 E Hearing Branch 1 80/07/OS 4pp
9007290456 Faruiflrds Btate of OR 770311 petition to intervene. NRC 770B01
stipulation w/Portlflnd QBneral Electric Ii State of OR & ASLD
770930 order ruling on contentions Documents intended to
••rv» a* example* fov drafting contentionE W/o ends
TURK, 8, E Hearing Branch i BO/07/33 Spp
DOCKET 71-OOB3 KERR-MCQEE NUt.LEAR CDRP
B00717O176 RenuBKts addl info ro QA program per BO0131 1 tr Requests
reply within 30 days
MACDDNALD, C E Transportation firanch BO/07/O3 lp
DDCHET 71-0109 UNION CARBIDE tORP
B0071704BO Raqueats addl tnfn re Qft program per 7^0tJSb 1 tr Requests
r«ply with In 30 days
MACDDNALD, C E Transportation Branch 80/07/03 lp
DOCKET 71-0131 NEUTRON PRODUCTS, INC
B007230349 forwards Revision 'J to OA program
8MEDIRA. C Noutron Products, Inc BO/06/2-1 3pp
— B0072303Sfl OA program, Revision 3
6MEDIRA.C , HANHOMOFF. J A Neutron ProtluclH, Inc BO/O6/24,
tOOpp
8007320099 Forwards QA program approval for radinactlve matl package
MACDONAL.D,C E TranEporlalion Branch BO/07/10 lp
— 0007320 lOt QA program apprnval far radioactive mat! package 0131,
Revision 0
MACDONALD, C £ Transportation Branch BO/07/10 lp
352
DOCKET 71-0139 HJLbA BAH HA Rrt\ , IHf
BOO721O200 Forwards
STEWART, W L Tul
ed Cirt program
ma «,iij. Int OO/O6/27 lp
— 0007210309 [»A progrom for r aijuaste packaging
* Tulsa (Jammd Rail' Inc GO/06/27 3pp
<JC-072'lnlSE> Forwards QA program approval far radioactive mat! package
MftCDONALD.C E frsnsportiiti on Branch BO/Q7/l-> Ip
— SOO71BO4a3 QA program For Chipping packages for radioactive Matli
Revision 3
* Nuclear Fuel Services, Inc (subs of Getty Oil Co I 80/OA/13
21pp
B007320Q55 Forwards OA program approval For radioactive rnttl package.
MACDONALD, C E Transportation Branch BO/O7/10 lp
— BQO732OO67 OA program approval for radioactive matl patdafle 0249)
Revision O
rIACDDNALD.C E Transportation Branch 80/07/tO lp
— 3007240193 flA program approval Fni radioactive matl package OB3"?.
Revision 0
), C E Transportation Ilr.inth 30/07/15 lp
DOCKET 71-Oli:1 HANCHERS EXPLORATION & DEV CO
B0071701H9 Requests a-diJl info re flft program per 79O427 Itr Request*
reply uithin 30 days
HACDDNALD.C E Tn-.in •> (infta 1 1 on Blanch QO/07/03 lp
DOCKET 71-0251 WEBTrNSHQUBE ELECTRIC CORP
8007240450 Forwards QA program approval for radioactive ntatl packa
HACDDNAUD, C E Transportation Granch BO/07/0"7 lp
— 80072-10457 OA program approval For radioactive matl package 0251,
Raviaion O
MACDDNA1,D,C E Trdnapor tat ( tn Branch 00/07/09 tp
DOCKET 71-0170 GENERAL ELECTRIC C,0
B00738O050 Reque^ta i-jtfn3iO!i until 8O1CO-I Fcr implcraentat i an at
flrtP-1. Reuision 1 BigniFicont lediiction In engineering
& operating personnel pracludes gBneration of prugr.im
procedures
CUNNINGHAM, Q F Oenernl Flcctrlc Co 80/O7/09 lp
BDCKET 71-0233 DAVTON X-RAY CO
B007O10B76 Foruiards OA program approval for radioactive matl package
MACDDNALTJ, C E Transportation Drouth BO/06/1S lp
— Q007O1O379 OA program approval for radioactive matl packag* 0252,
Revision 0
HACDDNALD, C E Transportation Br-anch 80/06/13 lp
DOCKET 71-0173 nATTELLE-PACIFlC NORTHWEST (.ADS
DOCKET 71-0371 RIDIHALOH, EGQEFiS t. ASSOCIATES
B007310013 Foriuarils CIA program jpprnvn) Tor radioactive matl par I ago
MAC/DONALD, € E Tranipor tat i on Dr.ar.ch SO/07/11 lo
— S00731O01S tIA program apprnvo! for radl-oactiva matl packao* 0173.
Flevlslan 0
E Tran^ipnrlfl t ion Ilrancli BO/O7/11 lp
BO07170493 Rcnueats addl info re QA program per 791019 Itr Ruqu»st*
reply within 3O dags
MACDDNALD.C E Tranoportat i on Branch BO/07/O3 lp
DOCKET 71-0346 PUBLIC SERVICE CO DF COLORADO
DOCKET 71-0179- MUCLEftrf CONTrtlNEnS, INC
ao07140i.9S Forwards OA program approval for radioactive matl package
HACDONALD.C E Transportation Branch BO/O7/01 lp
8007170-167 Requests dddl inFo re OA program per 791009 Itr Requests
rojily ulthin in days
HACDONALD, C g Transportation Dranch BO/07/03 lp
— B007140702 OA program approval for radioactive inatl packag* 034 A i
neviaion 1
MACDI3NALD, C E Tranuportati on Brancli BO/07/O1 lp
DOCKET 71-01B7 TQDD EHIPVAR&S CtlFlP
DOCKET 71-034B BRANCH RADIOGRAPHIC LABDRATORIEB
BOO 7 O3 003 A Confirms that Nf?C ICmnlilera 7BOiSi application for OA
jirogram uiithriraun Facililu may not contlipct transportation
activities in Non-Agroc-merit Stfltu por IOCFR1SO 20
MnCDDNALD.C C Transportation Granch BO/Ofa/17 lp
nOD7S90929 Forwards Revision 1 to OA program for industrial
radiography
BRANCH.W H Branch Hadiographic Laboratories, Inc 60/O7/11 lp
DOCKET 7J-0193 HI/CLEAR PACKAOTNO. INC
— B007S90731 Revision 1 to QA program For industrial radiography
» Branih Radiosrnphic Laboratories. Inc QO/07/ll 3pp
B007&B012S Advibos bhat revlsiid OA prnoriim ileac r-ip tl on will be
reauamittad bi BOOBOl per (100701 fceltori
OLIVADDTI.J R NucJoiJr Pailoging, Inc HO/07/01 lp
BOCKET 71-0331 ALl IS CHALMERS CORP
8007110014 Forwards QA program fur industrial radiography licens
OILLiS A All ii-Chalners Ci-rp RO/0&/13 tp
DOCKET 71-O37C- AMERBHAM CORP
6007290732 Foruiands HA program for packaging radioactive matls,
BELQHAIR.DP Amersham Corp SO/O7/11 lp
— aoo?29C-?34 OA program For packaging radioactive matl*
BELGJ1AIR.D P Amersham Corp QO/07/14 llpp
— BOO7I1001A OA program for industrial rad ing
« Alli«-Cha3rn«rs Corp E10/06/13 3PP
DOCKET 71-0371 MODEL NNFD-10, UNIFIED NUCLEAR CDRP
BO07230053 Forwards request For addl info to complete. peviBui of OA
program
MACDONALD. C £ Transportation Hranch BO/O7/10 3pp
ilng packayce For radioactive
c laubs of Oetty Oil Co )
DOCKET 71-0381 E L CONWELL I, CO
BOO703O6EO Forwards QA program for transportation of licensed ma
In response to NRC 800416 Itr
CAPFERiW EEL Conuell fc Co SO/06/04 lp
— •BOQ7QS0632 Oft program for transportation of licensed matla
Qrganiiational chart for industrial radiogiaphy end
« E L Conwell t, Co BO/04/Ofl 3pp
8007Q2051H Forward t QA program approval Far radioactive matl pacbagi
HACDONALD, C £ Tramp ortation Branch BO/04/17 lp
1 — BOQ7DZO9Z2 QA program approval for radioactive mail package O3Bi.
Revision 0
MACDQMALD.C E Trantportat ion Branch BO/Oi/17 lp
— B007O70133 GA program for facility
SO/06/33 4pp
BQ0716O7t7 Forwards OH pro-gram approval for radioactive natl pack
MACDONALD, C E Trafispnr tation Branch BO/Q7/O7 lp
— 8007169772 QA program approval For radioactive mat! package 039
Ravliion 0
MACDONALD-C E Transportation Branch GO/O7/O7 lp
DOCKET 71-0383 MODEL NLI 1/H LHT CASK, NL INDUSTRIES, INC
DOCKET 71-0393 ALL IS- CHALMERS CORP
0007230023 Ruponds to NRC B0041B d OBOB Itrs re QA program Radioactive
But IE ihipptd pursuant to 10CFR3Q,App H QA program satiEPioK
provl*ioni of 10CFR71 31 Date oF approval concurrent u/
approval data of liceniB
LUKDVALL.A E. Baltimore 8a> 6 Electric Co 80/0i/19 lp
8007340179 Forwards OA program approval for radioactive matl package
MACDONALD, C E Transportation Branch BO/O7/1S lp
— 8007240179 OA program approval For radioactive matl package 03B3.
Ravition 0
MACDONALD, C E Transportation Branch, 80/07/19 lp
DOCKET 71-O3&4 NEW ENOLAND NUCLEAR CORP
8007010970 Forwards QA Program approval For radloactiv* matl package
HACDONALD.C E TranspartatioTi Branch BQ/Ob/13 lp
—6007010374 OA program approval for radioactive matl package' Q3B4,
flavlsiim O
MACDONALD, C, E Transportation Branch BO/06/ 13 lp
000716034,3 Forwards OA program appioval For radioactive matl pacV
MACDONALD.C E Tr-Jinspar-tatinn Branch SQ-/D7/O1 lp
— B007 160347 (!A program approval Far radioactive matl package 039
Revision O
MACDDNALD.C E Transportation Branch 80/O7/O1 lp
DOCKET 71-4B24 MODEL HA-1O. BrtDCOCK & WIUCOX CO
BO07230017 Nntifios of eipiratipn a! Certificate of Compliance 4S
for Hndel HA-1O To continue using pac kag B. shoul dJ submit
cnnsolitfated application (« drawings
MACD.ONALD.C E Transpnrtdt ion Bi-otich SO/07/1O lp
DOCKET 71-4HB8 MODEL BENT1NEL-E5A. B, C, C3, D, Ei F, TB-EDYNE
B007O1O24O Foruards fee For roneual of three tortificatt
compllatice Requests reneual of current revision OF
Certificate of Compliance 1B8B For 5-yr period ending
QS0731
MCOREWj d M Teledgnu Energy Systems 80/06/13 lp
DOCKET 71-O387 MASSACHUSETTS MATERIALS RESEARCH, INC
B00707OO61 Forward* QA program approval for radioactive matl package
MACDONALD, C, E Tranipor tation Branch SO/06/ 12 lp
• — BQ0707OOoi QA progpai* approval for raid io-ac live matl packagi 03B7i
RvvlBian O,
MACDONALD, C E, Trantportation Dranth SO/Oo/12 lp
DOCKET 71-03B7 OEOK01A, UMIV OF
B0071O0347 Foruardt OA program for handling, storaoe b tran»portat ion of
•hipping container!
MUBE,L A Oiorgla, Unlv of, BO/06/17 lp
ao071tO3Bt Foruarda Revision 4 to Certificate oF ComplioTic e 4BBa
Models Sentinel S3A,25B. ?5C, 25C3, 35D,25E. 35F »t LCO-25A.25D tc
25C
HACDDNALD.C E Transportation Branch 80/07/07 3pp
— 3007160367 CartiFicate of Compliance A33B, Revi s 1 an 4, for Model'
Sentinel 35A. 25B, 25C.23C3, S50. S9E, 25F S, LCe-35A, 39B i. 35C
MACDOHALDi C E Transportation Branch 80/07/07 3pp
DOCKET 71-19Q£> MODEL RA-2. EXXON NUCLEAH CD .INC
QD07SBOD77 Requests intension of eipiratlon date to BO] 001 for
Certificate of Compliance 47B6 due to addl time required
for NRC approval of renewal application
KAPLAN, A L General Electric CD P NucloaT Energij Producta DiV
BO/O7/O1 lp
-80X17100333 QA program for hand 1 ingt storage & transportation of
• hipping containers,
* Oiorgla, Unlv of, , 60/06/17 Qpp
QOO7160409 Foruiards Revision f> to Certifitjtu of Compliance 49B6
MndBls RA-URA-a.nrt-3 t, RA-J
MACDONALD, C E Transportation Branch 8O/07/O7 2pp
WW716O322 PoTbiapdi OA program approval for radioactive matl packag
MACDOMALD.C E Traniportation Brancli, BO/07/01 lp
—B00716033S flA program approval for radioactive matl package 038?!
R»vUion o,
HACOONALD.C E Trannportatlon Branch SO/07/01 lp
— 8007160413 Certificate of Compliance 4I?Bi, Flev i alon i. for Model
RA-2.RA-3 fc RA-J
MACDQNALD.C E Transportation D ranch BO/O7/07 &pp
B0072B0718 Forwards RevisloTi 7 to Curti f 1 c ato -o P Compliance 49B(
Models fiA-l.RA-2, RA-3 h RA-J sMpplng containers
MACDDNALD.C E Transportation Orancb BO/07/H! 2pp
DOCKET 71-0371 NAVY, DEFT OF
80O71A031O Foriiiard* QA program approval for radioactive matl packagi
HACDONALD.C E Transportation Branch 80/07/01 lp
' — BOQ7160317 OA program approval for radioactive matl package 0391,
Rivl*i0n o,
MACDONALD, C E. Transportation Branch BO/07/01 lp
DOCKET 71-0393 BAKER TESTINO SERVICES, INC
8007070128 Forward* OA program !t shipping papers to accompany
tran«port»d packages of radioactive matls
KENNETH- B F Baker Testing Bervices, Inc BO/06/13 lp
— BQQ73S0720 Certificata of Compliance
RA-2iRA-3 fc RA-J shipping containers
MACDONALD, C E Transportati an Branch
Revision 7, for Mode
BO/07^21 App
DOCKET 71-90BB MODEL D347IO-1, U S NUCLEAR INC
B0071000BO Advisca that Certificate of Comp 1 lance 308B for Modi
D3471O-1 eiplres on B00?30 In order to cmifctmi* using
packagej should aubrolt reneu-il application -ti Pee !
HACDDNALD, C E Transportation Branch Q0/0£i/16 2pp
i'
8007240137 Requests uti thdrauia! of Certificate oF Compliance SOS
no longer has use For hade) D34710-1 ;
VOIQHTiA F Amos Lahoratori), Energy tt Mineral ReaourcBS
Ree Institute BO/Q6/SH lp i
354
DOCKETED ITEMS
DOCKET 71-3341 nODEL HFP-9S. UABCOCK fc W1LC0X CO
DOCKET 71-5926 MODEL 100, GENERAL ELECTRIC CO
BOQ7O10930 Application to amend Certificate of Compliance 9341 . Revision
3, revising Itom 5 laK2> re eicuptions to DDT Spec 6M &
deleting Item 6 Results of addl tost ing, inc lud ing 30-ft drop
test and
CDFtDANl.H A Babcock & Wilcfji CD . Naval Nuclear Fuel Div
HO/OS/ I 4 |0pp
B007170093 Foruai-dis Revision 4 to Certificate OF Compliance 5341 for
Model NFP-S5
MACDONALD. C E Transportation Uranrh BO/07/07 Ip
— BOQ717OO97 Certificate of Compliance 334 1, Flcvl sion 4, for Model NFP-5S
MACDOHALD, C C Transportation Branch BO/07/O7 3pp
B007110473 Forwards Revision S tP Certificate of Compliant* S9i?6 for
Model GE-100
HACDONALD, C E Transportation Branch BO/06/23 2pp
— 0007110476 Certificate of Compliance 3926' RtvUlon 9, for Model OE-100
MACDDNALD, C E Transportation Branch 80/06/23 Spa
DOCKET 71-5942 MODEL QE-7OO, GENERAL ELECTRIC CD
S00702Q9QO Foruardt Revision 4 to Certificate of Compliance 3942 for
Model GE-700
MACpONALD.C E Transportation Branch BO/OA/1H 2pp
DOCKET 71-5430 MUDFL RCC-l.-B.--3, UESTINQHDUEE ELECTRIC CDRP
BO071103B1 Forwards Revision •) to Certificate of Compliance 943O fur
Modoii ncc,RCc-i,ncc-2, ncc-3 <r. ncc-4
HACDDNrtUD, C E Transportatl on Branch BO/06/37 2pp
--8Q0703Q906 Certificate of Compliance 3942- RivUion 4. for Nodal OE-700
MACDDNALD, C E Transportation Branch BO/06/18 3pp.
POCKET 71-S937 MODEL DMI-1, ENEROV, DEPT OF
— Q00711O290 Certificate of Cump 1 lance 5450. Revision 9, for Models RCC,
ficc-1, ncc-s. Rcc-a t, ncc-4
MACDOMALD. C E Transportation Dranch 00/06/57 3pp
0 00721009 A Application Par amend to Certificate of Compliance 9490
extending eipiTfltion to Q01031 Rpquost tiBceH6Jry to assure
ship-mrnts requiring IAEA author i lati on after H00731
DIPIAZZA'R P Uentinghouse- Eloctric Corp 30/06/27 Ip
0007100004 Notification at registration an user of Model RCC in
rnipnnsc to request
HACOONALD.C E Transportation Branch BO/O7/09 Ip
300 72 50 HO Application for renewal of Certificate of ConpIUntt 9? 37
for Model BMI-1 shipping cask BAR encl
BUR I AN. R J Batkelle Memorial Institute' Columbui L*boPBtorl**
BO/06/ 11 9pp
—8007230119 "SAR for Model DMI-i Shipping Ca«k. " Revision A Ovariit*
dr*ulnfi* encl
* Bjttelle Hennfial Inititute. Columhua L*boratoriti. BD/03/S8
300 pp
0007020003 Reijueats registration »B user of Model 8N-J
TRIMBLE. D C Arkansas Pouter & Light Co BO/06/Oi Ip
DOCKET 71-9607 MODEL OC T-2, GE.NEHAL ELECTRIC CD
8007020001 RoqUBsts registration as user of Modal BMI-1
BVLVIArB R Virginia Electric tt Pouier Co HO/06/10 Ip
BQ07S40070 Forwards Hevision 1 to Certificate of Compliance 96077, suppl
to safety anolijsls reft ti Independent engineering evaluation
of changes to package
lIDSa, D M Energij.Dopt of BO/06/20 6pp
— Q007H40094 Certificate of Compliance 9fe07. RevUion 1 for Modal OE T-2
H Enoi-go, Befit of BO/05/31 3pp
DOCKET 71-S76H MUntL DB-aSO-2. COMOUST10M CN3INEEP.1NQ CO . INC
DOCKET 71-9971 MODEL OE-200, GENERAL ELECTRIC CO
8007320119 Forwards Revision 2 to Certificate of Compliance 3971 for
Model OE-200
MACDQNALD.C E Transportation Branch BO/07/09 2pp
— B007B201H5 Certificate of Compliance 3971, R»Vi »ion 2, for Model Ofi-HOO.
MACDONALDrC E Transportation Branch BO/07/09 3pp
80070 10 1O1 Application for reneuia] af Certificates of Compliance 976B,
63B7 1 6501 For Models Bn-330-H. 60 *• 91032-1, respect! velij
Fee encl
MICHEL, C J Nuclear Fuel Qorvkcoc. Inc Uubs of Oettij Oil CD )
BO/03/22 Ip
— B00701O106 ftoquesti flddl fe«s re 000!)2a application for renewal of
cBtei of Compliance 576B.63B7 t, 69B1
D L»cense To-e MonagamBnt Branch BO/06/OH tp
— B00701OI31 ForiuiiT-dB od<J 1 fees re 000932 application for i-eneual of
Certificates of Compliance 57 to, 6 3B 7 fc 65S1 in response to
mC QDOfiOa request
MJCHEU.C J NoclBar Fuel Services. Inc (subs of Dotty Oil Co >
BO/ 06/1 3 tp
DOCKET 71-9979 MODEL 9979, ALPHA-OMEOA SERVICES, INC
0007380131 Forwards application for Revision 2 to Certificate of
Compliance 9979 consolidating original application &
subsequent suppls referenced in certificate
BECK, E J Alpha-Omega Services, Inc BO/06/QO 2pp
— B0072B0199 Application for Revision 2 to Certificate of Canpllanc*
3979, consolidating original application tt subsequent suppls
referenced In certificate
» Alpha-Omega Services, Inc BO/06/30 ISOpp
— B0072B0160 "General Arrangement - Container "
* Alpha-Omega Bervlcn, Inc BO/O3/16 Ip
0007230131 forward* Revision 4 la Certificate oP Compliance 376B for
Model 013-350-2
MACBDHALD.C E Tronaportatlon Branch SO/07/10 2pp
— BQ07HE0138 Certiflcabe fl f Cnmpliance 976B, Revision 4 for Model BB-2BO-
2
MACBQNAUD.C E Tronsp Di-tat I on Branch BO/07/10 4pp
— B0072B016S "Container/Transfer Caik "
» Alpha-Onega Service*, Inc SO/03/ 1Q Ip
— 9007280173 "Details - Inserts (Turret) & End Cap* - Container/Tr«nif«r
Cask "
» Alpha-Daiega 8«rVlc»s, Inc HO/OA/30 Ip,
— B007SB0177 "Details - OvurpacJi fc Pallet - Shlp/Tran»f "r Calk. "
» Alpha-Omega. Services, Inc, BO/05/B1 Ip.
B 00720 0038 Foruards Revision 3 to Certificate of Compliance 3979 for
Model S979
HACDONALD.C E Transportation Branch 80/07/09. Ip.
— 8007230040 Certificate of Compliance B979, Revision 3> f or Modil 3979
HACDOMALO, C, E Transportation Branch BO/07/09 2pp,
DOCKETED ITEMS
355
DOCKET 71-39BO MODEL QE-6OO. GENERAL ELECTRIC CO
6O0701O399 Requests Issuance of Certificate of Competent Authority 3900
par 1973 IAEA regulation* for Model 6OO chipping container
I (tunned will restrict foreign shipments ta special form
Mtli fc limit fissile content of Pu b U-335
CUNNINGHAM, 0 E General Electric Co 00/05/14 38pp
— BO0701039B "Model 600 Transport Package '
« 0«n*r»l Electric Co 79/OS/2S lp
-BOO701O600 "Model 600 Shipping Cash "
* Oeneral Electric Co 79/OB/23 lp
— 8007140620 Application For ieneu.il of Certificate of Compliance A294
For Model UNC-S901 shipping package Three nversne drawings
enc 1
* C-E Power Systems 30/06/30 5lpp
B007240201 Forwards Revision 1 to Certifnatp of Compliance 6394 for
Model UNC-2901
MACDONALD, CE Transportation Branch HO/07/15 2pp
— BG072102O7 Certificate of Compliance hZf\. Flevi Elon 4. for Modffl
UNC-a9Ql
MACDDNALD.C E Transportation Branch 90/07/15 2pp
— 8OO70 10402 "Special Control Drawing Model 60O Cask Seal " Sheet 1
• Oeneral Electric Co 79/09/23 lp
— 8007010603 "Base Model 6OO Cask "
* General Electric Co 79/OB/24
DOCKET 71-6373 HQDEL PB-1, CHEM-NUCLEAR SYSTEMS. INC
800711O369 Forwards Revision S to Certificate of Compliance 6375 'or
Model CHS fl-45
MACDQNALD, C E Transportation Branch BO/06/23 3pp
-8O07O10609 "Jacket Model 600 Caik "
* Oaneral Electric Co 79/09/28
—0007110270 Certificate of Compliance 6375, Revision B, for Model CHS
4-4S
MACDDNALD,C E Transportation Branch 90/06/23 3pp
8007210041 Notifies that fee submitted U/79100B application Far
Rtvifion 4 to Certificate at Compliance 5900 ulll be
partially refunded in accordance uj/manpower eipenditures
review
MILLER, W a License Fee Management Branch BO/07/01 lp
DOCKET 71-H99B MODEL' CE-400. GENERAL ELECTRIC CD
DOCKET 71-63B7 MODEL 60, DATTELLE MEMORIAL INSTITUTE
BDD7O1O101 Application for rpnouial of Certificate* of Compliance S76fli
6337 (, 6SQ1 For Models DB-IJ-iO-^, 60 (. S1O32-1. respect ively
Fee ancl
MICHELiC J Nuclear Fuol Services, Inc (nubo of Hetty Oil Co )
BO/03/22 lp
B00721OSB3 Forwards Revision 2 to Certificate of Compliance 59<?B for
Model SE-400
HACDONALD.C E Transportation Branch BO/07/09 lp
— B00721Q3B7 Certificate of Compliant^ 999B, Revision 2, for Model GE-400
MACDOMALD, C E Traniportat Ion Branch BO/07/0? 2pp
DOCKET 71-6078 MODEL 927 Al & Cl. COMBUSTION ENGINEERING. INC
BOQ7Q20102 Foruards info & revised drawings re C-E Model 957A1 b 927C1
CQnt«in»n in support of application for reneuial of 791210
Certificate of Compliance 607B
HCHTENBEFlflER. H C-E Power Systems BO/03/30 6pp
— B00701O1O6 RequeatB addl fees re 800*132 application for renoiiial of
Certificates of ConpliancB 376S, 63B7 t, 6931
WEISS, J D License Fee Hiinagcmunt Cranth GO/06/C2 lp
— B00701012I Foryards addl feos ro 600923 iipplication for reneuial of
Certificates of Compliance 376B, 6397 & 63B1 in response to
NRC aoOi.03 request
MICHEL, C J Nuclear Fuel Services, Inc (nubB of Oetty Oil Co )
BO/Ob/13 lp
B00714O646 Forwards drawings in support of roc ert i f ica t i on of Mod H 1 60
shipping container
BMITH.F M Hanford Engineering Development Laboratory 00/07/02
— B007030109 "Bhipplng Container " Sheet 1 of i
« C-E Power Systems 80/OS/S9 lp
--B007140649 "Shipping Container Fuel Tin Model 60 Assay & Details "
Sheet I of 7
* Hanforil Engineering Dovelonment Laboratory 7O/05/31 lp
-BQO702Q10H "Shipping Container " Sheet 2 of 4
* C-E POUIBP BY sterna 776060 BO/OS/29 lp
— BQO7O2011Z "Base EC Cover Assembly " Sheet 3 of
» C^p Bower Systems 77fiO6O 80/05/29 lp
"Stronflbnck Assemblt) " Sheet 1 of 4
* C-E Power Systems 776060 BO/OS/29 lp
B00711O492 Forward* Revision 7 to Certificate of Compliance 607B for
Hodsli 927 A 1 & 927C1
MACDONALD,C E Transportation Branch aO/Oi/23 lp
— B00711O461 Certificate of Compliance 607fli Revi sion 7, for Models 937A1
t, 927C1
MACDONALD. C E Transportation Branch, BO/06/23 2pp
DOCKET 71-6H4 MODEL 6144. NUCLEAR ENGINEERING- CO
QO07O20495 Notification of registration as ucer of Model B-2 in
r»ipon«» to requeit
HACDONALD.C E Transportation Branch BO/06/17 lp
—8007 1 40694 "Shipping Container Fuol Pin Mudel 60 Assay fc Details "
Sheet 2 of 7
* Hanford EngineEring Development Laboratory 70/03/31 lp
— B00714065B "Shipping Container Fuel Pin Mode] 60 Assay & Details "
Bheet 3 of 7
« Hanford Englnsering Development Laboratory 7B/OS/H3 lp
— 3007140662 "Shipping Container Fuel Pin Model 60 Aseau EC Details "
Sheet 4 of 7
* Hanford Engineering Development L-ibnratary 7S/07/1B lp
— BOO7140666 "Shipping Container Fuel Pin Moilel 60 Asaay E< Details "
Sheet 9 of 7
* Hanford Engineering Development Laboratory /H/07/1B tp
— BD07M066B "Shipping Container Fuel Pin Model £0 Assay t< Detail* "
Sheet 6 of 7
* Hanford Engineering Development Laboratory 7B/O3/23 Ip
— -B007140673 "Shipping Container Fuel Pin hoilul 6O Aaaau t. Details "
Sheet 7 of 7
* Hanford Engineering Development Laboratory 7B/03/H3, lp
DOCKET 71-6294 MODEL UNC-3901 , COMBUSTION CNQ1NEEHINO, INC
BOOT 1406 13 Forwards application for renewal of Certlficati of
Conplianc* 6294 far Model UNC-290I shipping package
E8KRIDOE. H E C-£ pouer Systems 80/06/20 lp
— B00714067S "Pin Hal del- Assembly " Shoet 1 of 1
* Hanford Engineering Development Laboratory 7H/O9/H9 lp
— 8007140687 "Liner Shipping Containor Fuel Pin Model 130 t>
Details " Sheet 1 of 2
•* Hanford Englnpering Devel upmunt tub oratory 76/0
— 8007140690 "Liner Shipping Container Fuol Pin Model lEu iti
Sheet 2 of 2
» Hanforil Engineering Development Lslmratory 7A/01/li
356
O00722O[fl3 Fen-words Revision 6 to Certificate «f Compliance 6307 For
Model 60
MACDDNALD, C E Transports t i on Branch BO/07/ IO 2f p
--B0072201S2 Certificate of Compliance 63H7, Revi a ion 6, f or Modol 60
MACDONAt-D,C E Tranapnrtation Drnnch BO/07/10 5pp
DOCKET 71-6&9B MODEL NFS— I. NUCLEAR FUEL SERVICES, INC
B007300001 "SaFatij Analysis of Modified NAC-1 Spent Full Shipping"
C-asV "
» Nuclear Assurance Corp NAC-E-8Q1 Rl BO/07/13 SOOpp
a007BB077A Forwards Revision 7 to -Certificate of Compliance 4337 for
Model 6Q shipping package
MACDO-NALD, C E Transportation Dr.nich BO/07/23 2p p
S007O2O422 Forwards Revision 10 to Certificate of Compliant* 66 VB far
ModBl NFS-4
HACDONALD, C E Transportation Branch BO/06/19 3pp
— 8007280779 Certificate at Compliance 63B7, Revi si un 7. for Modol 60
shipping package
MACDONALD, C E Transportation Branch £10/07/33 3pp
DOCKET 71-MOO MODEL 5UPEH TIGER, UESTINQMQUSE ELCCTH1C CDHP
H0071QQ1QO Responds to B006O3 Itr re proponed OC Spec BD-31 49 for Insp
of Model 6400 package Spec does not assure compliance OA
program aunt he sub-mittad rp procurement, maint. repair d
USB Ace optarttE criteria end
MACBONALD.C E Transportation Brand) 60/06/17 12po
DOCKET 71-656B MHDEL LI -&Q-ISO, TVA
— SOO702042B Certificate of Compliance 669B. Revision 10. for Haiti NFS-4
MACDONALD.C E Tranipor tation Branch BO/06/ 19 6pp
8007180449 Application for revision of Certificate of Compliance Ai9G
to provide schodular flexibility in performance of inner
*hell measurements & to Include prenatif ication requlranent
to NRC oP time & location of measurement operationi
JOHNSON, C R Nuclear Asiuranco Corp BO/07/03 2pp
SQO733053a Forward 4 Revision 11 to Certificate of Compliance 6A9B far
Model NFS-4
MACDONALD.C E Transportation Branch BO/07/14 3pp
— BO07HB0343 Certificate of Compliance C.69B, Revision 11, for Modal NFB-4
HACDDNALD C E Transportation Branch BO/07/14 6pp
300727000(1 ForurariI-9 Rcvialnn 1 tn Certificate nP Compliance 636B far
Mndal LL-60-lSO •sJiipping container
MACDONAl-D.C C Tranaportatinn Branch 80/07/21 2pp
— S00729O01I Certificate nF Compliance 6560, ftuvl sion 1, fur Model
LL-6O-1SO shipping con tsl ner. supcrced Ing Certificate of
Compliance 9033 entirely
MACDONALD.C E Transportation Branch BO/07/21 3pp
DOCKET 71-iBSl MODEL 31032-1 !< 1A. EXXON NUCLEAR CD . INC
BOQ70101O1 Application for reneual of Certificates of Compliance 97
i3Q7 fc 653] For Models DQ-S30-2, to t. 31032-1 , reappctivelg
Fee end
MICHEL, C J Nuclear Fuel Services. Inc (subit of Otttti; Oil Co )
00/05/22 lp
DOCKET 71-t717 MODEL 6717 D
BQO7390377 AdvisBS of name & address change from Contra Coita
Industrial X-Ray Co in Hartinei.CA to Contra Costa Imp
Co in Concordj CA
DAWSDM, fi a Contra Costa Inspection Co BO/O9/01 lp
— 8007290282 Requests registration as user of Model 333
Nj R Contra Costa Inspection Co 00/07/01 lp
B<H)7SaOOB6 Notification of registration as user of Mod*) A717-B
MACDDNALD. C E Transportation Branch BO/07/10 lp
DOCKET 71-9009 MODEL FL 10-1. GENERAL ELECTRIC CO
-BOO70JOIQ6 Requests addl fees re DO 0522 oppliration Par reneual of
Certificates oF Compliance 5769, t'J07 t. 65B1
WEISB, J n Htunae Fee Management Drouth 80/04/03 lp
-8007010 1HI Forwards aildl Pees re 000922 application far renewal ot
Certificates of Compl lancu S7fiD, 6337 & f>9Bl In reipanse to
NRC B(>0fi02 request
MICHEL.C J Nuclear Tuirl BorvicoB, Inc (suba of Gutty Oil Co )
BO/06/13 lp
BOO7110161 Fcruards Revision B to CertLficato of Compliance 9009 for
Model FL 10-1
MACDONALD, C E Transportat Ion Qrancn BO/06/13 3pp
— Q0071101AA Certificate of CompHanca 9009, Ruvi sion 8, for Modal FL 10-1
MACDONALD.C E Transportation Branch BO/06/13 4pp
DOCKET 71-9O10 MODEL NLI-l/H. NL INDUSTRIES, INC
B007100040 Foruards Revision 12 to Certificate of Compliance 63B1 for
Models 91032-1 & 51Q32~!a
MACDDNALDiC E Transportation Branch BO/O6/31 lp
B0072B0313 Requests Revision & to Certificate of Compliance 9010 to
authorlie shipment of PHR U otide fuel atiembllei
W1LLIAMS.C E NL IndustrieB. NL Nuclear Div SO/06/B3 3pp
— BD-071D0041 Certificate of Compliance 69Q1, Revi sion 12, for
31032-1 Sc 51032-1 n
MACDONALD.C E Transportation Branch 80/06/S4 4pp
QOQ7£17001i) F-oruards Revision 7 to Certificate of Compliance 7010 for
Model f4UI-l/3 fllilppiiig package
MACDONALD.C E Transportation Branch BO/O7/16 Hpp
BOO7160386. Requests Certificate oF Compliance 65Q1 he intended for
3-month p>erioi) until 001O31
HAWSEN,4. E Enon Nuclear Cn , Inc (EUDS of Cnon Corp )
BO/06/24 lp
— B007S9001B Certificate of Compliance 9010, Revision 7, for Model NLI-1/2
shipping pactaje. superceding Certificate of Compliance 901O
Revision /> entirely
MACDONALD. C E Transportation Branch BO/07/16 5pp
6007320046 roruarfls request fnr addl info re 790613 application
requesting amend For Model 51033-1 & 31032-la package*
Info should be 1 ni nr p-ara t o d as reviaoif pages into
appllcat 1 on
MACDOMALD.C E Transportation Branch tlO/07/07 Hpp
DOCKET 7J-6679 MODEL I /a EWER TIGER, NUCLFrtR ENGINEERING CO
0007340153- Appllcntlon to renew Certificate of Complianco hbTi
BAEF1.T S Nuclear Engineering Cn , Inc, . (subs of TuUditne. Inc )
BO/06/S7 Jp
DOCKET 71-9O19 MODEL TN-B. TRANBHUCLEAR. INC
B007020327 Fnruards Revision 2 to Certificate of Compliance 9013 for
Model TN-B
MACDONALDPC E Transportation Branch 80/06/18 lp
— BO 07030332 Certificate of Compliance 9015, Revi sion S, for Model TN-8,
MACDONALD, C E Transportation Branch BO/O6/1B 3pp
LOCKET 71-9016 MODEL, TN-9 , TRAN6NUCLEAR, INC
DOCKET 71-6697 MODEL H300 PKO, OENEflAL ELECTRIC CO
8007320039 Notification Of roflistrntinn as user of Moilel GE B300
MACDDNALD, C E Transpor lation Branch BO/07/10 lp
B007020312 Foruiirds Revision a to Certificate of Compliance 9016 for
Mndnl TN-9
MACDONALD.C £ Transportation Branch BO/06/1B tp
357
— 8007020317 Certificate of Compliance 9016i Revisi on 2. for Model TN-9
MAC DONALD. C C Transports* 1 on Branch BO/06/1S 4pp
DOCKET 71-9O1B MODEL BU-6. GENERAL ELECTRIC CO
BOO72SO096 Advil* » of intention to ship radioactive matls from listed
facilities using Package Model CNBI AL-33-90
MAYER, L 0 Northern States Power Co 80/07/03 Ip
DOCKET 71-9019 MODEL BU-7, QENEflAL ELECTRIC CO
8O07210O43 Advis«s that fee submitted U/BOO314 application tot
Rev in ion a 3 & 4 to Certificate of Compliance 9O19 will be
partially refunded in accordance m/man power eipend itures
revieu
MILLERiH O License Fee Managgment Branch BO/07/01 Ip
DOCKET 71-9039 MODEL 715, TECHNICAL DPhfJAriQNB, INC
BO07030375 Forwards consolidated drawings re 600520 Itr comerning
application for renewal of Certificate uf Compliance 9039
HUNRQ. J J Tech/Ops (Technical Operations, Inc ) 3O/06/13 Ip
— BOO7030376 "Model 333 Prnjuctm Descriptive Assembly " Sheet 1 of S
« Tech/Dps (Terhnical Operations, Inc ) SQ/O6/Q6 Ip
— B00703037B "Model 533 Projertor Descriptive Assembly " Sheet 3 of S
* Tecft/OpB (Technical Operations, Inc ) SO-/O6/O6 Ip
— B007030379 "Model 713 Projector Descriptive Assembly " Sheet I of 2
« Tech/Dps (Technical Operations, Inc 1 BO/06/09 Ip
— BO07O3O38I "Model 713 Projector Descriptive ABsembly " Sheet 2 of 3
* Tech/Ops (Technical Operations. Inc I BO/O6/&9 Ip
DOCKET 71-7OSH MODEL CE-33O-2, COMBUSTION EN6INEERINQ CO . INC
BQ07020107 Forwards addl Info supporting BOOlll renewal application far
Certificate of Compliance 9025, per NRC BOO501 request
Reviled page* encl
LIChlTENDEROER, H C-E Power Suntems 80/06/O6 6pp
— BOO703O394 "Model 616 Gamma Hay Projector DeBrrintive Assembly " Sheet
1 of 2
» Tech/Ofls (Technical Operations, Ini ) BO/O6/O3 Ip
--8007030385 "Model bib Gamma Ray Projectnt Descriptive AssBjnbly " Sheet
2 of 2
* Tech/Ops (Technical Operations, Inc > BO/06/03 Ip
— BOO7020114 "Shipping Containe*- "
* C-E Power Systems 7499-7/6030 79/06/13 Ip
O0070204B4 Forwai-d* Revltton 4 to Certificate of Compliania 9022 for
Modal CE-S50-2
MACDOMALD, C, E Transportation Branch BO/06/19 3pp
— 8007020983 Certificate uf Compliance 9022, Revision 4, for Model
CE-290-2
KACDONALD.C E Transportation Branch 00/06/19 2pp
0007 2802 11 Notiftis that company no longer remiires registration as
user of Model CE-29D-2
AUSTIN. M A Bahcoclt & Wilcoi Co , Nuclear Material Div BO/07/OB
— S0070303B6 "Model 614 Indium Pipe Crawler Descriptive Assembly " Sheet
1 of Z
» Tech/Ops (Tethnical Operations, Inc I BO/Ofa/lO lp
— B007030387 "Model 644 Iridium Pipe Crawler Descriptive Assembly " Sheet
2 of 2
* Tech/Dps (Technical Operations. Inc ) 80/06/11 lp
B007320279 Advises that registration as ust-r of Model 715, as indicated
in NRC BOO520 Itr. is not necessary No radioactive mabl
shipped
DAWSDM, RS Contra Costa Industrial X~Kaij Co BO/Ot/16 lp
0007170178 Notification of reoistrati on as user of Model 715 in
response to request
HACDDNALD.C E Transportation Branch BO/07/Of lp
DOCKET 71-7027 MODEL' 741. TECHNICAL OPERATIONS, INC
6007030347 Ren.ue*t« rigiitratlon as user of Models 6SO, 660- 600 h 741
JOHNSDN.K NavyiDept of BO/05/27 lp
DOCKET 71-7030 MODEL 9ENTINAL-B, 3, 1, MW-3000, TELEDYNE, INC
80O701O245 Forward* fee for renewal of three certificates nf
eoMpllance. Requeiti reneual of current revision of
Certificate of Compliance 9030 far 3-yr period End inn
890731.
MCQREM, J, W Telvd^ne Eneroy Syitema BO/06/13 lp
BOO7aa0961 Forward* Revision 3 to Certificate of Compliance 9Q3O for
Models HM-3000, Sentinel-3 & Bentinel-0
HACDONALDiC E Transportation Branch 80/07/14 lp
— -B007B80S63 Certificate of Compliance 9030j Revision 2, far Models
MU-3OOO. Sentinel-3 h Bentinel-B
HACDDNALDrC E Transportation Branch 80/07/H 2pp
DOCKET 71-9033 MODEL 630, TECHNICAL OPERATIONS, INC
90070303A7 Requests regictration as uaer of Models &50> 6bOi 6BQ b 741
JOHNSON, M NavU'D'pt of 00/03/27 lp
DOCKET 71-9033 MODEL 660 & 660E, TECHNICAL OPERATIONS, INC
DOCKET 71-7044 MODEL QE-1600, GENERAL ELECTRIC CO
B00734O300 Foruards Revision 5 to Certificate of Compliance 9044 for
Modol OE-1600
MACDONALD.C E Transportation Brunch BO/07/15 3pp
— 8007240215 Certificate of Cprapliance 9044. Hevisicn 5. tar Model OE-1600
MACDONfiLD,C E Transportation Branch 80/07/J5 5pp
DOCKET 71-9049 MODfcL GE-300, GENERAL ELECTRIC CD
BOQ72S0573 Forwards Revision S to Certificates oP Compliance 9049 For
Model CE-500
MACDDNALDjC E Transportation Branch 90/07/14 lp
— SO072B05BO Certificate of Complianco 9049. Hevi si on 2. for Model QE-500
MACDONALD.C E Transportrttion Branch BO/07/14 3pp
DOCKET 71-9053 MODEL 693. TECHNICAL OPERATIONS. INC
BOO7100373 Forwards application for renewal of Certificate of
Compliance 9053 fni Mndnl 693 Type B
MUNRO. J J Tech/Ops (Technical Operations, trie ) BQ/06/16 3pp
— B007100376 Applicntion for roneuial of CerliFicote of Compliance 9093
for Model 6B3 Type B
« Tech/Ops (Technical Operations. Inc 1 BO/06/13 S2pp
B007030367 Requests registration as user of Models 650. 660, 6BO (< 741
JQHNBON.rt Navy.Dept of 80/05/27 lp
8007SB069B Foruards Revision 3 to Certificate of Compliance
Model 693
MACDDNALD.C E Transportation Branch BO/07/ i 4 2pp
DOCKET 71-7039 MODEL 6BO, TECHNICAL OPERATIONS, INC
S007O30367 Request! registration as uaer of Models 650,660,680 t, 741
JOHNSON, M Navy.Dept of BO/03/37 lp
— S0072BO703 Certificate of Cnmpliance 90BJ3, Revi 5 i on 2, for M
MCDONALD, c C Transportrttion Hrantli BO/07/14
358
DOCKETED ITEMS
BC-O7390II6 Advisfi tdat Mndrl iiB3 par Vatje. Cprt I F itiite of Compliance
9053,ineolB 1ACA ruqiur emenU
, C E Transportation Dr.inch 00/07/14 IP
— B0070a0605 Revision 3 amends to Model NP-50nL app 1 Icatlon, delating
stainless steel liner ti including full-scale drop teat rept
» Nuclear Packaging. Inc BO/06/06 13pp
DOCKET 71-9070 MC1DFL N-55, ENDIQV. DEPT QF
QO-O716O417 Requests registration as user of Model H-59
S Chem-Nocle.sr System*. Inc 00/06/26 !p
B0078300?! Notification of i on 1 atrat ion at, user of Model H-S5
MACDDNALt), C E Transportation "ranch 80/07/10 lp
DOCKET 71-9000 MOI>H_ HN-tOO, HITTMAN NUCLEAR !, DEVELOPMENT CORP
8007100000 Notification of registration a* user nf Model HN-iOO in
response to request
MACDOWftLD. C E Tr ansp ortat t nn Branch BO/07/09 lp
BQ073B0763 Forward i Revision 4 to Certificate nf Compliance 9OBO for
Hod el UN- 4 DO shipping package
MACDONALD.C E Transportation Qrjncli 90/07/31 3pp
— B0072G0766 Certificate of Cnmpiianco 90BO, Ravi si on 4. for Model HN-600
shipping package
MACD-ONALD. C E Transportation Branch SO/07/31 3pp
BQQ7070177 Forwards Revision t paoea to SIR {application* for Modal
NP-50ixL casts
HAN5EN.L J Nuclear Packaging. InE 80/06/06 lp
— SQ07070179 Revision 3 to pages BAR (application) for Modtl NP-9Qs»L
casks
I Nuclear Packaging, Inc 80/06/06 9pp
— B0070701B3 "Transportation Shield. Type A.ModBls SO-1 5L, 8O-2 BL.
50-3 Of. & SO— 1 DL " Sheet 1 of 2
* Nuclear Packaging, Inc 79/01/16 lp
— 8007070105 "Transportation Shield TgpB A, Models 90-1 31.90-2 3L,
BO-3 DL & 90-4 DL " Sheet 2 of 2
* Nuclear Packaging. Inc BO/O6/06 lp
BOO7110461 ForiuarifB Revision 0 to Certificate of Compliance 9130 ror
Model NP-5Q-2 3L
HACDBNALD.C E Transportation Branch BO/Ot/23 lp
— 9007110468 Certificate of Compliance 9130, Ravi sion 0, f or Kodtl
NP-30-2 5L
MACDONALD.C E Transportation Branch BO/06/33 7pp
QOOT03022a NntiTbes NFiC nf intention to ship radioactive matl Prom
farilitio5 using MaJel IIM-^00
MAYER, L O Northern atntus Poiuer Co BO/Ofi/13 lp
DOCKET 71-9001 MDBl-L CNSI-H.OO, CHFM -NUCLEAR SYSTEMS, INC
800733049 G Requests r eg is tr.itl on a5 user of Model CNS1 1-13C
HERBE]N,J O Metropolitan Edison Co BO/07/11 3(1 p
DOCKET 71-7091 MflDbL CN(SI~14-19I}-H. CHEM-NUrUEAH SYSTEMS, IMC
DOCKET 71-9133 MODEL T-3, NUCLEAR PACKA01NO, INC
8007210154 Kequesta registration as user of Model T-3
FITZ9IMMONS. T Energy, Dept of SO/06/19 lp
BOO7SaolB4 Rcq.UB5ts registration as user of Model T-3
KEENEY.W P Argonne National Laboratory - Aroonne West 80/06/27
B007240212 Forwards Revision 1 to Certificate of Compliance 9132 Fop
Model T-3
KACDDNALDiC E Transportation Branch BO/O7/15 Zpp
SOO7100461 Buhmita p«ymont For extensions of Certificates of Compliance
9094. flevi st on 5 * *iQ1b, Re vi sion H providing for reqirired
transition of gaskot seal rliarnjes
S Cftefn-Huilcar tuTitemE. Inc BO/06/16 lp
— 80071Q0462 RequpstE payment for eitensions of Certificates of
Compliance 9094, Kevl aion 5 !. 9096. Revi sion 3. providing
for required transition of gasket seal changes
HEIBS. O Licence Fee Management "ranch 00/06/11 lp
6007140342 RoquBBts that all futgro correspondence be addressed to
author
CRANE. P A Pacific Oas l< Electric Co 00/06/17 lp
— BOO?afl0317 CFrtif!cate of Compliance 9133, Revl sion 1, for Modal T-3
HACDQNALD, C C Transportation Branch SO/07/15 4pp
DOCKET 71-9136 GENERAL ELECTRIC
SOO71B0460 NotiFiea of minor corrections t. clarifglng ehanoai to
Draylng 90SE61S. "OE Packaging Model 9136," originally
submitted u/300331 approval request
CUNNINBHAM.O E General Electric Co HO/06/11 2pp,
— 80071B0470 "GE Packaging Model 9136 "
MUN18 General Electric Co 00/01/30
DOCKET 71-9090 MfWfcL CNSl-i!l-3tJO, CHCM-NUCLEAR SYSTEMS. INC
BOQ71QO4M Sulimlta pnijmenl for «> tension* of Certificates of Compliance
9094, Revision 5 ti "7096, Rcvi 61 on £ providing for required
tTj3n5ltion of Basket teal changes
CORDETT.O B Chem-Nuc Iwar BysUmn. Inc 00/06/16 lp
— 0007100462 Rcquiftto payment for enteimnns of Certificates of
Compliance 90"?4, nevlsloii S A 9O96, Hevi 1 1 on a. providing
for required transition of gnslcet seal changes
Llcrnie Fee Mflnngemont "ranch SO/OA/ 1 1 lp
-710(1 HODFL. AL-33-9O. ATCOR. INC
ffnquests registration as. user nf Morfel CN3 6-79
C Ark=r,«-.c iJr,Uor t, 1-lflht Co 00/06/37 lp
BOO 72200 69 Authoriies delivery to carrier for traniport of up to 30
hoods Et glove boles containing lou level solid raduiaito in
accordance ui/s.tatements Ei rBproscntations made in 800331
Itr, Safety ovflluatiun encl
MACDQNfiLD.C E Transportation Branch 00/07/02 lp
— B007820097 Safety evaluation re delivery of up to 30 hood» fc glova
boisa containing loui level solid radioactive matl to carritr
for transport in Model OE-9136 packaging
MACDOANLD C E Transportation Branch SO/07/OH 4pp
DOCKET 71-9139 MODEL QE-3S9. GENERAL ELECTRIC CO
BOO&190913 Forwards addl info on Mode) 3B9 re application (NKDD~24fil3)
For NRC certification For inclusion in BOO 324 submittal
Overs! IB drawings available in Central riles only
CUNNINOHAM.O £ General Electric Co 80/05/29 44pp
radioactive matla from listed
-33-90
BO/07/03 lp
PACKAGING, INC
foi certificate of compliance
30/06/06 lp
BOO&190921 "Lead Shielded Shipping Casks "
« PX EngineoTing Co , Inc 60/03/07 lp
BOO6190923 "Lead Shielded Shipping Casks "
» PX Engineering Co , Inc BO/OS/07 lp
BO061VQ929 "Lead Shialrfed Shipping Casks "
0 PX EngineeTlng Co . Inc BO/O3/05 lp
DOCKETED ITEMS
80O72BQ771 Foriiiards Revision O to rertifltate of Compliance 7139 for —0007380773 Certificate of Compliance 9139, Rtviilon O, tor Hadvl
Model SB9 shipping package shipping package
MACDDNrtLD. C E Transportation Branch BO/O7/22 ip MACDONALD, C E Transportation Branch 80/07/22 Sjtp
COMMISSION NEETINO RECORDS
BO0701OO23 Marked up transcript of 77O331 Commission policy session in
Washington, DC re NRC fc intl physical protection stds
Fp 1-23
» Commission 77/O3/31 2Spp
B0070105B9 Transcript of B00624 public meeting in Washing ton. DC to
discuss ABLE rept on clearance rule Pp 1-49 L Blckuit 791109
memo to Commissioners and
* Commission BO/ 06/24 67pp
6O0702015O Transcript of SQO419 public meeting re briefing on rept on
potential threat to nuclear activities from insiders & DOE
itudy an effectiveness af security clearances Pp 1-50
0 Ueisi statement & vieugraphs encl
« Commission BO/06/19 89pp
8007030347 Transcript of B00426 public meeting u/ropresentati ves of
Conference of Radiation Control Program Directors re
Agreement Status program in Washington, DC Pp 1-3B Horning
session, Related correspondence encl
» Commission BO/06/26 4Qpp
8007070011 Transcript of BQ04B3 public briofing for Commissioner
Oilinsky by AIF on financial status of utils. in Washington.
DC Pp 1-67 Morning session Vieugraplis encl
* Commission 00/06/33 98pp
B007070013 Transcript of Affirmation Session 80-30 on 000626 in
Washington. DC Pp 1-4 Morning session
t Commission 60/06/26 6pp
B007070O16 Transcript of 000653 public meeting in/industry, state (, local
ti special interest group panels on emergency planning &
preparedness rulemaking ti NRC response Pp 1-131 Afternoon
session Rotated statements & correspondence encl
» Commission SO/O6/23 600pp
BQ0709002B Transcript of BOO 3 16 open Affirmation Session 00-33 In
Washington, DC re order In Tarapur export Pp 1-3
» Commission 80/05/14 4pp
— B00709003Q Informs of correction to SECY-BO-23B re proposed eiports of
fuel & components to Tarapur Commission SECY papers cited
are incorrectly referenced Draft memorandum fr order encl
BHEA.J R Office of International Programs. Director BO/OS/13
13pp
—0007090033 8ECY-BO-S3BA
Forwards NMSB technical review for Commission's
consideration in conjunction u/revleli) of pending Tarapur
fu*l ti component exports
SHEA.J R Office of International Programs. Director BO/03/13
IP
— BO 07090038 Forwards proposed NM8S technical review for Commission
consideration re proposed exports of fuel & components to
Tarapur
BURNETT, R F Division of Safeguards BO/05/12 4pp
BOO 70904 04 Transcript of 800431 closed meeting In Wash ing torn DC rt
US-Canada agreement Pp 1-4
* Commiialon 8Q/0&/20 Spp
B007110142 Transcript of 800513 closed meeting in Washington. DC re
discussion of Tarapur export license Pp 1-14
* Commits Ion SO/06/ 19 lipp
B0071 10186 Transcript of S00710 briefing nij Eiecutive Branch on Intl
Safeguards in Washington! DC Pp 1-42
» Commission, BO/07/10 Mpp
BOQ71I0494 Transcnpt of 790621 [In
matters in Hash Ington. DC Cp 1-49
* Commission 79/06/21 51pp
d I sc HE Hi on
tntl safeguards
B007140065 Transcript nf 000626 discussion of BECY-BO-107 re prnposed
interim hydrogen control rcqulioments for amall contoinmBnts
in Washington, DC Pp 1-S6
* Commission GO/06/S6 5Bpp
— B007110O6B Requests participation in B00i2£. Commlsaipn meeting TO
hgdrogen contra! Substantial hydrogen generation is
effectively prevented in BUR due to unique inherent design
features
BHERWOOD, 0 0 Genernl Electric Co 00/06/23 Ip
B007140074 Transcript of 00061D staff prEaentati on on final
rulemaklng on emergency preparedness in Wash ing ton, DC f'p
1-90 Vieiugraphs !< TEMA B00602 1 tr enc 1
» Commission BO/06/1B 9ipp
— 800711O079 Buppnrta final rule on emErgencij proparodneBB Rule in
consistent u/FEMrt prnpOBed prncDdures For review of stat*
plans (' preparednesi NRC ul II bo furnished copies af rEMA
approval of state d local plans as appropriate
JETTiO Federal Emergency Management Agency QO/06/OJ Ip
B007I40230 Transcript of 800624 Affirmation SasBinn DO-31 in
Washingtoni DC Pp 1-9 Certification t> disclaimer Dlicl
* CommiBSion BO/06/26 t Ipp
BO07140277 ReaponifE to FD1A roquost for all i'lFo lulnch directoif OT
discussed any changes of proposed fire protection rule in
SECY-BO-OBB App documents have been forwarded J Quihert
80O311 memo withheld (ref FDIA Eiemptlnn 3)
FELTDM, J M Division of Rules and Recurda 80/06/26 Spp
— SOO7140291 Staff ruqulrement memo re 800423 ppon Afftrmation Bn-asion
BO-IB in Washing ton. DC Includoa overall records of
Commission votes re SCCV (10-166, SECY HO-177 t. BECV-OO-oaB
CHILK.S J Office of the Secretary of the Commission flO/O^/Dl
13pp
B007140491 Responds to F01A request for ropt on potential threat tn
nuclear activities from InaiderSiDQE study on Df foctl vanvss
of security clearances t> supporting documents used at 800619
brlafing re repts Documents available at PDft, DOE !> CIA
FELTON, J Division at Rules and Records 90/07/10 Ip
— BD07140304 Sunshine FR Notice nf CgmmlsBlon meetings during uk of
800616
MAGEE.W Office of the Secretary of the Commission BO/04/1A
B00714O19B FDIA request for ropt an potentifll threat to nuclear
activities from insidersiDGE study on effectiveness of
security clearances fc Bupporting documents used at 80061*7
briefing re repts
CDCHftANi T D Natural Retources Befenao Cnuncll flO/Ot/BI Ip
8007110339 Transcript oF 790931 cl
Safeguards Policy Pp 1-40
* Commission 80/07/03 12pp
neeting re Task forte on NRC
Q007I7OS0B Commission determination statement Submits lint Of portion*
of transcript of 79Q30Q discussions to bo withheld from
public disclosure (ref 10CFR9 104)
CH1LK.S J Office of tho Secretary nf the Commission 60/07/03
8007170396 Transcript of Commission 79030Q discussion re eiport matter
in Washington. DC Pp 1-49 Portions uilhheli! <ref IOCFR9 104)
» Commission 79/03/00 49pp
361
362
NONDOCKETED ITEMS
B007I7O315 Transcript of Commission 800609 closed discussion re
testimony to tie given BOQ61 1 in Hashing ton, DC Pp 1-53
* Commission BO/Ot/'Ca 35pp
BOO7300020 Transcript of 800529 public meriting on personnel dosimetry
performance testing in Washington. DC Pp 176-275
» Commission BO/05/39 lOOpp
00O717O527 Advises that Commission determined thai transcript of 771019
briefing on special safeguards implementation repts should
bo withheld (ref 1OCFR9 104)
HOYLEjJ C Office of the Secretary of the Commission BO/07/OB
B007300024 Transcript of B00723 meeting in Washington' DC re diicutsian
tc vote on emergency preparedness rule Pp 1-13S Supporting
documentation enc 1
* Commission BO/07/33 BSOpp
B0071705S4 Advi ses that Commission determined that transcript of
77O921 briefing on special safeguards implementation repts
shoulil be withheld per IOCFR9 lOBIc) * IOCFR9 104(a)(l>
HOVLE, J C Office of the Secretary of the Commission GO/07/09
8007170587 Commission determination statement releasing portions of
Transcript of Commission 773215 briefing by C Dennett in
Washington. DC Pp 1-41
» Commission BO/O6/30 13pp
3007170590 Unofficial transcript of Affirmation Session SO-32 on
800703 Jn Hash ington, DC Pp 1-3
* Commi sslon BO/O7/O3 5pp
90Q7I70S97 Unoffical transcript of Q00703 public meeting re NRC
response to panel presentations an emergency planning In
Hasnittgton.DC Pp 1-50
* Commission BO/O7/03 tOpp
— B007170604 BECY-BO-H75H
Proposes mods to FR k final rule changes on emergency
preparedness submitted for Commission approval In
EECY-BQ-279 Changes do not effect cost estimates Replacement
pages end
MINOBUE.R fl Office of Standards Development, Director BO/07/02
23pp
BC-07100027 Cnmmiaaion d«terminotl pn statement releasing portions of
transcript of 77O90S legislative testimony In Washington,
DC Pp 1-113
* Commission BCVO7/G2 Hipp
BO-071B0091 Transcript: of 300131 Affirmation Session In Hash injton, DC
Pp 1-11
* Commission BO/OI/31 12pp
B00721Q384 Unofficial transcript of S00715 briefing In Washing ton, DC re
analysis of alternatives for conducting independent
verification testing on environmental It) qualified equipment
Pp 1-71
-« Commission BO/07/15 74pp
B007240135 Transcript olf Commi ss ioners/ACRB joint meeting on 800711 in
Ha«lnn9tnn, DC Pp 1-aB
» ACRB - Advltori) Committee on Reactor Safeguards BO/O7/1I 30pp
9007240439 Unofficial transcript of 800717 public meeting re safety
issues in Washington. DC Pp 1-40 Handout end
» Commission 80/07/17 iipp
BQQ7240449 Unofficial transcript of B00711 public meeting In
Washington. DC re nuilsar data link Pp 1-74
* Commission BO/O7/I1 77pp
3007230014 Transcript of 800711 Affirmation Session BO-33 re
SECV-80-E74 in Wash ing ton, DC Pp 1-2
* Comml s si on ao/07/1 1 3pp
B007300S37 Sunshine PR notice of Commission BO0721-23 open m»»ting» In
Washington. DC for budget presentations
TWEED,!? M Office of the Secretary of the Commission 00/07/16
2pp
6007300345 Sunshine FR notice of Commission B0071B & IB open meetings
in Washing tan. DC to discuss matters outl Inesi inc luding
Identification of neu & unresolved safety issues
TWEED, P. H Office of the Secretary of the Commi»»ion BO/07/10
app
80073003SZ Sunshine FR notice of Commisslan B0071S.21 & 22 neetingi in
Washington, DC to diacuna outlined matter*, ine luding Brouins
Ferry problem, budget fc export Issue (closed session)
TWEED, R H Office of the Secretary of the Commission BO/07/15
SPP
ADVISORY COMMITTEE ON REACTOR SAFEGUARDS
a 00 SI 50676 NRC in examining action plan t ttmn & judging applicability
(r scheduling uhich leave some sites w/o applicable criteria,
PLESSET.M 8 ACRS - Advisory Committee on Reactor 8«f«ouHrdt
BO/09/06 2pp
B0061i0059 Discusses draft final rules 10CFR90 It 70 on emergency
planning NRC-FEMA approach should be developed & implemented
to encourage state !c local agencies to incorporate federal
efforts into their emergency planning
PLEBBET. M B ACRS - Advisory Committee on Reactor Safeguards
80/06/11 2pp
8006300097 Responds to ACRB 600418 memo fortuarding 8L Cohen B00384 1 ti-
re loss of water supply from refueling uater storage tank
Describes design provisions b operational flteurity measures
making total loss of uater during LOCA unlikely
DENTON, H R Office of Nuclear Reactor Regulation. Director
SO/OS/33 3pp
— B006300113 Foriuards draft of study>
Accident " Requests revieui
COHEN.B L, Pittsburgh, Univ of
"Physics of Reactor Meltdouin
80/03/24, lp
B007010359 Summary of B43nd ACRB meeting on 8006Q3-Q7 in Mash ington, DC
Liats items scheduled for consideration at 343rd ACRS
meeting on 800710-13
PLEBSET, M 8 ACRS - Advisory Committee on Reactor Safeguard!
BL-02S1 BO/06/19 3pp
B 00702 03 15 Notice of change of date of ACRS Subcommittee on Concrete fc
Concrete Structures B00325-2& meeting Nein date is BOO 4 2 2-23
HOVLE, J C, Office of the Secretary of the Commission BO/03/ M
B007030340 Transcript of ACRS Subcommittee on Safeguard* b Security
B00426 public meeting In Washington. DC Pp 1-129 Horning
session Sandia Labs vleugraphs entitled, "Nuclear Pouer
Plant Design Concepts for Sabotage Protection," end
* ACRB - Advisory Committee on Reactor Safeguards. BO/06/B6
!7Spp
—6007350019 SECY-80-374
Recommends approval af publication of regulations re
implementation of IAEA requirements for licensees Draft FR
notice & press release & Eummary of comments encl
MINQQUE.R D Office at Standards Development, Director EHEA.J R
Office of International Programs, Director DIRCK8. H J Office
at Nuclear Material Safety t< Safeguards BO/06/02 127pp
B007030361 Transcript of ACRB Subcommittees on Waste Hgt It Pu*l Cycle
B00636 joint meeting in Washington, DC Pp 1-32 Afternoon
session
• ACRB - Advisory Committee on Reactor Safeguards BO/06/26, 33pp.
8007100149 Forward! meeting agenda For E43nd ACRS meeting on 800603-07
In Washington, DC
ZECH.G G Technical Support Branch 80/03/19 Spp
8007110431 Transcript of ACRB Subcommittee an Reliability h
Probabilistic Assessment 8OO701 meeting in Ingleuoodt CA
Pp 1-2S6 Slide presentation by Nuclear Safety Analysis
Ctr encl
•» ACB8 - Advisory committee on Reactor Safeguards BO/07/O1
486 pp
B00711043S Transcript of ACfiS 800703 meeting in Jngltwoodi CA re
Class 9 accidents Pp 1-329 Supporting documentation encl
* ACRS - Advisory Committee on Reactor Safeguards 80/07/02
NONDOCKETED ITEMS
363
B00714O323 Summary of ACFIS Subcnrnmi t tee on ECCS 800325 meetinfl in
Hashing torn DC re Host Inghousc upper head injection adequacy
re ECCB model or small break LOCAs Supporting documentation
«ncl
» ACRE - Advisory Committee on Reactor Safeguards B0/0*,/06 4Bpp
8O07S101JV Di<,r u^Ei's. di vf I npmon t of v.iUt bluckt uoing line nude
hit toad of • 1 1 1 1 on t-.ii hide tine aiiAe valve tnlumn-b can he
readily connpitod in parallel for increased ttiermal
copacity Paper ie tint oiidi> varistor protective sys enc I
JOHNSON, I li Affiliation Unknown RO/OA/09 llfip
8007140531 Summary of ACH8 Power l< Electrical Sys Subcommittee BOQ401?
meeting in Washington, DC ro possible response lo Qllinsky
8O0307 Itr re nuclear data link in emergencies
» ACRB - Advisory Committee on Reactor Safeguar ds BO/06/06 lOpp
BOO/21O33E Humm.iry of ACRS D(.W Water Reactors Subcommittee BQO429
meeting in Wash ingtoni DC re NURCO- Odi/i "Transient Response
of BdU Designed Reactors "
fl ALRB - Ailvibory (.ommittcc- tin Reactor Safeguards EiO/-ufe/O5
— 8O0714034O Comments on nuclear data link sys between NHC t< operating
nuclear pouor plants Supports NUI!EQ-06i,0 objective (Hit doeo
not agree u/uti 1 i lati on of data for issuance of NJ»C orders
Industry input !• need basis should be considered
ANDERSON, T M West inuhouno Electric Corp NB-TMA-33BB 80/04/O9
2pp
BOO72IOa5fl Responds to Commission 800401 Itr r en.»<>5t i nB clarification
of ACRS conrerna u/prosenV reactor tuolant pump trip & HP1
termination criterion Empliatis dn immediacy of pump trip (<
on eventual automatic may nut be desirable
PLESSET.M 6 ACR4 - Advisory Committee on Reactor Safeguards
BO/07/ tii Jpp
B007140547 Summary of ACRS Ad Hnc Subcommittee on NfIC Action Plans
Developed as fie suit of TMI-2 Accident B004QI-02 meeting in
Bethesua.MD re Draft 3 of NUREQ-OfcfiO
• ACRB - Advisory Committee on Reactor Safeguards BQ/Oi/07 34pp
6007150005 Transcript ACRS Subcommittee of Reactor Safety tie-search
Q0070B morning meeting in Wash ington, DC Pp 1-293 Supporting
matl end
» ACRB - Advisory Committee on Reactor Safeguards BO/07/OB
323pp
B007310923 Responds to Commission BOOdOA request for vleuis on use of
in-core thormot pupl es an iiid In detection of off-normal
conditions t- in-artldont anulij-ils Inntiumentn displaying
readings should be readily rwailable In control ronmB
F'LESBET.rl S ACRi3 - Advisnry Commuter on Reactor Safeguards
no/07/16 2pp
Q0073IOSafl Summary of^ ACRB bubi. timnn tloo on Regulalorij Activities 800430
meeting in Uasli ing Ion. DC
» ACRQ - Advisory Committee on lieactor Safeguards 00/06/03 B3ff
E1007130026 Tronscript ACRS Subcommittee nn Fire Protection 800709
• ftarnoon matting in Waali ingtoni DC Pp 1~1S3
« ACRS - Advisory Committee on Reactor Safeguards SO/07/01?
I24pp
8007310331 Summary of ACRQ Subtommi ttee on Eitreme Ei torn a I Phenomena
79lll3-ld meeting in Los Angeles, CA ie matters concerning
NfIC rencarch on eiternal phenomena
• ACRB - Advisory Committee on Realtor 9flfeouiirds BO/03/S3 S6pp
B007150439 Summary of ACRB ATUS Subcommittee BC103S6 meeting in
Huh ing ton, DC ui/NflC t, industry represents!! ves re resolution
of ATWB
* ACRB - Adviaory Committee on Reactor Safeguards BO/03/16 a'ipp
0007210300 Summary of ACF1B Sulidommi ttoe on Concrete !. Concrete
Structures 13Q0123-2J meeting in Unshlncjton, DC re research,
technical asslntanco !i Belsmlc safely pronrama
* AC ftG - rtilvii.org Committed on Reactor Safeguards 00/06/03 13pp
8007 1 5 04 43 Summary of ACRS Ad Hoc Subcommittee on NRC Action Plans
D»volopBd as Result nf TMI-2 Accident B00309 meeting in
Hash Ing ton, DC re near-term OL Items Identified in plan
* ACRS - Advisory Committee on Reactor Safeguards BO/06/03 34p(i
B0072S0037 Transcript of ACHS huhcommi ttee on Advanced Reactors BO070I7
meeting In Hnolilnglon. DC Pp I~l4y
» ACRB - Advisory Commit lop on Reactor Sidferfuarrls BO/07/OI9
310pp
8007170301 Transcript of ACFIB Subcommittee on Advanced Reactors
6O0630 meeting In Lao AngelesiCA Pp 1-563 Slide presentation
end
• ACRS - Advisory Committee on Reactor Safeguards BO/O&/3O
0007230013 Notice of AC US suuromml tteos !> uior k i ng nrnups' preliminary
schedule of Jol-Bept 1C*BO proposeil meetlnuB
HDVLE, J C Ilfflce of the Becietari; nf the CommiESlon H0/0(,/17
5pp
B0071B0002 Transcript of ACRB 243rd meeting in Wash ing ton- DC m rVOB
tafely researclr budget fc venting of TM1-S containment
Pp 1-24& Supporting matl encl
* ACRS - Advisory Committee ori Reactor Safeguards BO/07/10
B007P300S3 Notice of ALIH5 Subcommittee on Advanced React lira B007O9
meotitip in Wanhlngloni DC tn dlncuss continued roviww of NHC
funding t< direction for annual ACRS TBptt
HQYLE.J C Office of the Secietary of the Commission
B0071B0024 Summary of 339th ACRB meeting on 791103-10 in Manh ington, DC
List of attendees, agenda t> Appo 1 through 34 end
* ACRS - Advisory Committee on Reactor Safeguard* DQ/G2/26
400pp
0007180028 Summary of 237th ACRS meeting on 800110-12 in WaohlnDtom DC
Liit of attendees! agenda It Apps 1 through 24 end
» ACRB - Advisory Committee on Reactor Safuguards BO/04/S8
ZlOpp
80071B0603 Comments on revised draft emergency plans proposnd hi) NRC
Offsite plan would be improved IP coordinated through FEMAi
u/other types of emergencies that occur more frequently
HEALY, J W Los Alamos Scientific Laboratory BO/OS/2B 3pp
8007310027 Comments on propoaetJ rule, "Fire Protection Program for
Nuclear Pouinr Plants Operaling Prior tn 790101 " Rule should
b» lupplmnenbed by rcg guides to reduce range of
intarpretati one Rule should not he condensed
LIPINSK1-W C Arjonne National Laboratory SO/06/11? 3ap
0007210029 Comments on ACRS Subcommittee on Concrete & Concrete
Structures 8O0422-23 meeting Industry should he responsible
for certain klndi of research NRC should suppl that effort
by research related to ouin minion
HKITE.M White, M P Consulting Engineer CCB-1 BO/OS/BS Ip
B007S10090 Notice that clotffd sestions mill not be necesiarg for
previously announctd ACRS subcommittee meetings listed
AffectBil meetings Include Snfnguards t< Security on B00426 t.
Haste rlgt b Fuel Cycle on 800A3i-27
HOVLE.J C Office of the Bocrobary of the Commission 00/06/23
IP
B00/23002ft Notice of ACHS Subcommittee on Tire Profocllon BOO70'?
mooting in Wa\h ing toni DC tu dd-ciin pruposeit fire protirction
rule for facilities operating prior to 7'P01Ok per BECV-QO-
QO
HDVLE, J f IlfflcH of the iiecrot.irij of the Cnmmlsalon DO/06/19
2pp
B007H300-JO Motlce of ACHS Sulu omm| ttee on Class •) Accidents BQ0703
meeting in Inrjleuoodi CA tn dlticmt. Class 1 role in licensing
procBSHinuad For degraded Lore mitigation feature* t< FVDH-flU
NHC research hudgel for sevoro accident phe-namena
HDVLE- J C Office of the Secretary of the Commission 00/Ot/ll
B0075301I3 Notice of ACRS BubcomniHtoo on Reactor liafBty RraB.
&00708 meeting In Hash ington, !)( to discuss cuntlnuvd rewlou
of NRC research program
HOYLE.J C Dfflce of the Suiri't.irij of the Commission
Spp
8007930120 Notice or indefinite postponemunt c4 Affty Bubcoromi tteo
ECC8 BOOAH4-J3 mooting noted in 000609 FR
HQYLE, J C Office of the Hucrotdry of the CDmmlsalon 60/06/11
B007230123 Notice of AfRS Subcommittee on FU'l t Ab i 1 i t^j t, Probnbi 1 1 atlc
Assessment Q00701 meeting In discuss continued evaluation of
quantitative safety goals
CHJLK, 6 .1 Office of the liecietury of the Commi B« 1 on HO/06/ 1O
B007230134 Notice of ACHfl Bubiommltter on Advancei! floacUrs
meeting in liiflleuinod. CA ro NRC funding d pr-ngrnm -direction
CHILK.B J Office of the ^fciutary of the Commlaslon BO/06/10
Bpp
364
NONDOCKETED ITEMS
8007230729 Notification of ACHS BOU710 meeting in Washington, DC to
discuss proposed rept re NHL -.afety research budget for
FY02
HOVLE.J C Office of the -iecrelary of the Commission 80/06/19
3pp
GOQ724Q425 transcript of Cofflmi st, lonersMCRS jmnt meeting nn 000711 in
Washington, DC Pp 1-2B
•» ACRE - Advisory Committee nn Reactor Safeguards BO/07/11 30 p p
BOQ724O475 Comments on fire protection Reg Guide I 120 excess
automation maij present haiarde greater than fire Flooding fc
collapse of traijs may be seriuus Mater resistance of aged
dry cot) lei unknown
EBERSDLE, d C ACRE - Advisory Committee on Reactor Safeguards
76/09/16. 3pp
6007350321 Transcript of 243rd WR8 meeting on 900711 (n Uaoh ington. DC
Pp 4c.O-SB£,,Part a
» ACRH - Advisory Comrtittep fln Reactor Safeguards BO/07/11
146pp
000730000? Transcript of ACB5 24 3rd moating on 800711 in Washington. DC
Pp 3S3-457
• ACRS - Advisory Committee on Reactor Safeguards BO/07/11
139(1 p
BQ073000Hfr Transcript of rtCR6 S43rt! meeting on F300710 in Washing ton. DC
Pp 247-323 Uieuigraphs oncl
* ACF1B - Advisory Committee on Reactor Safeguards BO/07/10 9Spp
B0073tO!)E'l Notification of ACRS Subcommittee on Safely Philosophi) I.
Criteria OOOBO6 meeting in Mash ington. DC to discuss progress
re roqui reoien t a For neai — term CP plants
HOVLE.O C Office of the BeiTotarg of the Commission 80/07/17
3pp
COMMISSION NRC COMMISSIONERS
7909110639' Responds to 79O703 Itr re approval of NRC actions
IIENDRie. J M Cpnuimsinn 79/07/16 Ip
790926.0537 Responds to 790591 Itr r« transport oP radwaste from TMI &
air- shipment of nerve gas bombs from Co to UT Status are not
routinely noli Pi oil of raduoste shipments DDD has
jurisdiction over transport of nerve gas eiplosive weapons
HCMDRIEiJ M Commission 79/09/11 I3pp
B007O1OS7Q ReiipQniJs to 790306 mi'mo re revised civil penalties proposal
Buaaosta Section B34ic) be uot-ded "Commission shall afford
to person notified per subsection Ib) opportunity for
hearinfl "
BTOBBEFi.C R office of the General Counsel 79/03/08 5pp
000701O5la Responds to 791113 Itr requesting aaBESsment of Uashington
Post 791SI1 article re "Radiological Assesament of HHVL
Kuclear Power Plant " DFc of Nuclear Reactor Regulation
completing detailed review iif rept
AHEAT1NE, J F Commission QOfOS/30 Ipff
B0070I0534 ndvisog that Commi s-si oner Brad ford mill assume speaking
respunalblli ty nt BOD924 ALI-ABA toiirse on atomic enargij
llcET'Slrig ti regulation
HEHDRIC, J M Commission BO/06/11 Ip
0007030023 WuoHij Into rept For wk ending 900613
HEHM.T A DTFlce of the Eiecutivc Director for Operations
SO/06/ 1Q £3pp
BOD70SD1S9 Poruai'di response to questions in B0051S Itr re NRC resource
alloejjtlons for FYBI fc 83 Iricludee post-THI licensing
requ i rementsi rcsoifrce allocntions For CP reviews vs. OL
revitus (< number of DL reviews processed
AHEAItNE-J F Commission QOYOb/05 <1pp
— 90070 ?010B Requetts response to questions, on behalf of Senator Dellmoiti
PD WRC resource allocations for FYBI J* 83 Includes po»t-TMl
llcunsing requlremen ta. resource allocations for CP reviews
v* OL reviews d number of OL revleus processed
HATFIELD.M D Senate, Appropriations BO/OB/12 Ip
OOU702033D WespondE to Commi5Bion B0051S request for estimate of NRC &
applicant resources needed to identify eitent to which DL
app 1 1 cat i ana comply u/current NRC regulations Tuiri addl man-
ijra per application uouli! be required bg NRC t< applicant
DENTaN.H R Office of Nuclear Reactor Regulation, Director
BO/06/13 6pp
— E007O30331 Foruiards procedure for documentation of deviations from SRP
SEfts isiuud after 77O101 for plants under OL review Si
issued after 770QOI for CP applications under review are
to document deviations from SRP
RUSCKE, D C Office of Nuclear Renctor Regulation. Director
76/09/30 llpp
— BO07O20336, Foruarils rttvised procedure for documentation of deviations
from BRPi superaod ing 7i(W20 memo Procedure remains unchanged
for CP reviews, but rflqutres only limited licensee
participation in OL reviews
RUaCHE, H C Office of Nuclear Reactor Regulation. Director
77/01/31 15pp
BO07020673 Ac k receipt of invitation to participate in round table at
concluding p 9 enaru. session of intl conference on
curre-nt nuclear plant safety issues In Qc t 19BO Round table
dlscussi on Is excellent idea
HENDBIE. J M Commission BO/Oi/ 1 1 Ip
— 6007020674 Notifies of B01O20-24 Intl conference on current
nuclear plant safetg Issues In Stockholm, (Sweden Conference
will include round table discussion to identify current
vlcus 6 Issues related to conference
EKLUNDi S International Atomic Energy Agency (Austria) BO/OS/29
2PP
BOO7030335 Draft NRC reorganl lat ion plan, Number 1 of 1980
» Commission BO/O5/O1 4pp
B007OB007i Comments on B 1860,0(11311 Dusiness Innovation Act of 1979,
requiring Federal agencies IB/research !. doveloment budget
In eicesa of *100, 00-0, COO to establish small business
innovation research program Discussion of problems oncl
AHEARNE.J F Commission BO/06/12 Bpp
B00708003S Requests comments on encl 8 1860, Small Business Innovation
Act of 1977. requiring federal agencies w/research (<
development budget In excess of *1OO- OOO, OOO to establish
small business Innovation research program
NELSON.G Senate, Small Business BO/03/11 tBpp
H0070I?0104 Rasponds to Subcommltteo on Nuclear Regulation BOOS01 Itr
posing questions re Commicslon approach to foreign health tc
aafetij issues CammlsEton Issued decision an reactor export
to Philipfines on BOO SO 6 U/rcsponie to specific questions
AHEAFfNE, J F Commission 80/Oi/Oh llpp
— 800709011'! Order grantins issuance of licenses to Waatinghous* for
eipurt n? reactor to Philippines Separate Comrai asionor
oji in ions end
CHILK,S J Office of the Bocietary of the Commltalon QO/03/Oi
61pp
OOO70?0122 Meekly info rent for uk ending Q00627
REHM, T ft DPifice of the Ciecutive Director for Operations
DO/07/03 3<lpp
600711 OOiB Meekly info rept for ulk ending B00620
HEHM, T A Office of the Eiecutivo Director for Operations
BO/06/ai aSpp
C0071103ii Providnfl Subcommittee on Oversight b Investigations u/
detdlled TOoponseB to questions re role t< Impact of OHB in
atimlTtiatra ttun of laws d NRC operation
F Commisslnn GO/06/ 12 iOpp
800711027S Koquests rBiponse to questions re role It impact of DMB In
intmilllE t rat ion of laus !< NRC aparation
ECKHARDT.B House n-f Rep . Intorst !< Foreign CommerCB BO/03/21
7pp
a0071102Oa UlscuiBes legal basis for NRC budget referral to OMB W/
supporting documents t ion
STOlDEn.C n Office of thu Ocnopal CounsEl 7B/07/HB 20pp
BO0702OI69 ReijiiBut-t responte to J Hendrtus concerns etpressid in
790HHfc memo re revised civil penalties legislative proposal
KENNEBY.R { Commission 79/03/06 3pp
-8007110396 DitcussBi intoragency comments on NRC Mill Tailings Dill
Includns matters raised by EPA, DOE t. DO I
STDJHEFtj C R QFfico of the General Counsel 70/06/23 14pa
-B007I1O397 Statement o f JF Ahearne on President's Reorganisation Plan 1
of 19UQ
j J F Commlssinn BO/07/OB Bpp
NONDOCKETED ITEMS
365
B007110298 Responds to request far info re impact of Nuclear
Nonprol i f Bration Act institutional arrangements on
decision about proposed U exports ta India
KENNEDY, R T Commi ssion BO/06/13 Ip
8007110377 Informs Subcommittee on Nuclear Regulation of status of
Agreement State regulatory programs Programs in all 25
states determined adequate For CY79 Significant program
deficiencies found in CA & FL
AHEARNE.J F Commission BO/06/24 3pp
— B0071103B2 Informs Subcommittee an Environ Energy ft Natural Resources
of status of Agreement State regulatory programs Programs
in all 25 states determined adequate for CY79 Significant
program deficiencies found in CA S, FL
AHEARNE.J F Commission BQ/Ofc/a-l Spp
— 0007110387 Informs Subcommittee on Energy EC Environ of status of
Agreement State regulatory programs Programs in all 39
states determined adequate for CY79 Significant program
dHf icioncies found in CA & FL
AHEARNE.J F Commission 80/06/34 2pp
— B007110392 Informs Subcommittee on Energy & Power of status of
Agreement State regulatory programs Programs in oil 23
states determined adequate for CY79 Significant program
deficiencies found in CA d FL
AHEARNE.J F Commission eO/Oi/84 2pp
— SQ0711Q393 Discusses status of Agreement State regulatory programs
Programs in all 25 states determined adequate for CY79
Significant program deficiencies found In CA S< FL
HVANi R O Office of Management and Program Analysis aO/Oi/19
3pp
8007110399 Provides Subcommittee on Nuclear Regulation Li/responses to
B0062Q questions re licensing & const of new onsite spent
futl storage pools
HAMMERER, C Office of Congressional Affairs BO/06/31 llpp
8007 11 0530 Provides Bub committee on Nuclear Regulation Uf/comments on
actions taken in amending S 235B Requested funds for
casework personnel loan assistance program & TMI-related
work aru much needed Add) comments forthcoming
AHEARNE.J F Commission 80/04/23 2pp
8007140120 Responds to a 00630 1 tr re Commission 8006 16 statement of
policy on TMI-related DL requirements Commission has no
intention of restricting litigation of TMl-related issues
Change would permit parties to raise morn, not fewer, issues
AHEARNE.J F Commission SO/06/30 Hpp
800713083? Submits contribution to Commission decision process re
access clearance rule For SNH by reviewing setting for
dec ision> presenting observations on state of record & legal
issues b outlining principle options available
B1CKWIT.L Office of the General Counsel 79/09/11 17pp
S007160516 Meekly info rept for ufc ending B00620
REHMiT A Office of the Executive Director for Onefations
BO/Q6/25 36pp
B0071607I6 flEBpond's to request for NRC vieus on DOE legislative
proposals re extension of NRC licensing authority over
certain DOE Facilities for raduiaste mgt NRC does not support
DOE proposals due to inconsistency lu/NRC recommendations
AHEARNE.J F Commission BO/06/ ]<b 7pp
BQ0716QB4B Express** appreciation for 800922 1 tr to NRC re future role
of Oft of State Programs Views expressed uiill be carefully
considered in any reorfloni lati on which may affect OFc of
State Programs
D1RGKB.U J Office of the Executive Director for Operations
BO/Q6/Q4 Ip
— 8007160851 E>prBsnes concern re future role of Ofc of State Programs
Dfc is vital source of current info * regulations on nuclear
power facilities in Northeast Urges continued operation of
Ofc of State Programs
LADD, E Massachusetts. State of BO/03/22 Ip
8007160B94 Elpreases appreciation for B008E3 UP to NRC ro future role
of Qfc of State Programs Vieuis etpreised will ho carefully
considered in any reorganization which may affect Dfc of
State Programs
DIRCKS.U J Office of the Executive Director for Operations
80/06/04 Ip
— 8OO7160B58 Eipi esses concern le future role of Dfc of State Programs
Ofc has been Df great assistance to State of CT in
addressing several pressing nut leer-related issues. Urges
continuation of Ofc of State Programs
FITJPATRICK.T Connecticut, State of BO/O3/23 Ip
B00717041& Responds to request for views t< recommendations rs enrolled
bill to authorize appropriations to NHC for FYSQ Commission
has revioujed !< found bill acceptable Tiuo noted technical
corrections should be made
AHEARNE.J F Commission BO/Oi/aO Ip
— 8007170418 Requests vieuis f< recommendations re encl enrolleil bill to
authorne NRC appropriations For FY60
FREY.J H Office of Management !, Budget BO/Ofa/17 14pp
SOQ7180Q39 Forwards comments made During South American Conference on
Small d Medium Siie Reactors in Montevi deo, Uraguay re
future oF nuclear power in US; in response to SOO&O2 1 tr
KENNEDY. R T Commission BO/Oi/lE Ip
— 8007100034 Comments on BOQ417 testimony before Subcommittee on Energy 6
Mater Development Majority of US utils employ good people,
but attentions are diverted !. diluted in responding to
regulatory details
LEE. S Commonwealth Edison Co BO/ 09/02 Ip
B0071B0036 Forwards Representative Udall 781I2B Ur re nuclear accident
revietu board proposal ACR5 should be asked to set up
suitable subgroup to make trial levieu of incidents Ji
occurrences per H Lcyi s recommendation
HENDRIE.J H CommiKsion 78/13/05 3pp
— S007IB0427 TommEnts on H Leuis suggestion For creation oF nuclear
accident revieio board adequate consideration has not been
given to benefits that might result from analysis of AOs or
other accidents by independent revicu group
UDALL.N K House uf Rep 78/tl/BB 4pp
— 8007180431 Requests viguis on cncl H Leuiis suggestion For improved
nuclear accident analysis !< prevention by creation of
statutori ly independent quasi-judicial board
UDALL, M K House of Rep , Intorior & Insular Affairs 7B/O1/27
4pp
B0071B01M Declines invitiation to participate in MorJd Congress of
Metallurgy in Lima. Peru Invitation passed to other memberg
of Commission fc NRC staff for anyone interested in attemJlnc
Congress
KENNEDV.R T Commission 80/05/08 Ip
— BO071S0169 Eitnnds invitation to participate in World Congress of
Metallurgy in Lima, Peru, aoOMo-21
DETETA.P M . NAvAHRQ, C C Peru BO/04/OB Ip
B0071B021o Ack receipt of 800303 Itr commenting on talV given at Droiun
Univ on 800327 re energy d providing info on cancer risks
KENNEDY.R T Commission FJO/OS/12 Ip
— S0071B0221 Commends 00O327 speech at Drouin Univ re energy Realisms are
being insinuated into US energy considerations Provides info
re UT cancer claims H/o encl
LAPP, R E Lapp. Inc 80/O5/03 Ip
8007180488 Ack receipt of SQ040fl ]tr providing brief description of
proposed instrumentation syt for mousuring uater level in
core of PUR Addl exchange of info necessary to compare
proposal w/others
KENNEDY, R T Commission 80/03/28 6pp
8007180494 Ack receipt of B00623 Itr Nuclear power can tcMeve Full
potential !< help tn meet natl pnergij needs only if
continuing dialogue between reguldtors !, plant operntors
eiists
KENNEDY.R T Commission BO/06/30 Ip
— 80071B0379 Ack receipt uf addl info on civilian nuclear power industry
Nuclear power is vital to US ti world energy needs Well-
regulated t< pperdtod nuclear plant presents very 1 nu luvel
risk
LEE, B Commonweal th Edison Co 80/Q&/23 2pp
B0071BOS01 Eipresses gintitudH for valuable contributions to nuclear
research over last 5 yrs
KENNEDY. RT TommisBlon SO/05/06 Ip
B0071BOS44 Wepklij info rept For ink ending B00703
REHM, T A OFFKo of the Enpeutive Director for Dptvations
80/07/10 EOpp
386
IMONDOCKETED ITEMS
BOO71BOS30 Responds to 8O04IO telegram Gros.5 error in telegram should
be corrected Reason for postponement of NRC H00421 meeting
on Philippine etport applications uas that some
CommiiBlaners more rot ready to release [.pinion on Issues
KENNEDY. R T Commits i on 80/O5/E3 IP
-HUQ7P4IM7I Provides fjiibcnnwniLUit iin Envi ran, Ennrot; t. Natural Resources
uj/duBcrlpt ion of actions ru iiti> of minting nuclear sites
far now poMior plonto t. for rdiliuasto storage, pel- OAQ 000401
rept pHCDmmenilatl 0111 W/n end
AHEAIWE, «1F Commiislnn (10/07/10 lp
BOO733O224 Responds to F01A request for H Denton 000613 memo to
Commissioners entitled, "Compliance of OL Application! H/
Current NRC flegulati ons. Reg Guides fc Branch Technical
Positions ' ("oruards raenm
FELTCrt. J M Division of Roles and Records BO/07/16 lp
0007231)239 FOlrt request For H Denton 000613 memo to Commt asioneri
entitled. "Compliance of CL Applications W/Current WF1C
Hegulat laiii-fleg Guides fc Branch Technical Positions "
WEISS. E (i Sheldon, Harmon !. Weiss BO/07/11 lp
B007230735 Ack rnceipt of S00512 !tr re progress in cooperative eFPortu
to reduce pilckafling !< transport problems Full line Insp
coverage at Peattij should be d iieontlnueil Contract re
transportation survfl 1 1 lante mill be forwarded •shortly
AHEflRNE.J F Commission BO/06/12 lp
--8007230739 rtdvisBs that full-time iNHC inspector will no longer he
needed at Bcattg.NV waste d ispnsa 1 Bite State ufi 1 1 provide
appropriate map surveill'an-ce as of BOOiQl
LIST.R Nevada, State nf BO/OS/ia lp
B007230743 Responds to BOQ23P. Itr rt strenotli ening Ji clarifying federal
laws related to physical security at nuclear facilities
Cammentt, on specific a real In Itr re sabotage^ guards,
personnel selection & protection of safeguards info
AHEAF1NE, J F Commission fJO/OA/12 IBpp
--0007330791 Eipresees concern re phij&ieal securili) of nuclflar
facilities Need to strengthen I, clarify federal lau eiiitt
in areas of sahotag u, guards, personnel selection ti screening
& protection at safeguards info
WALSKE, C Atomic Industrial Forum BO/02/S3 -Ipp
S007240G37 Acli receipt of B004B9 Itr commenting, on policy statement for
THI-related OL requ irements StatemBnt does not diminlth
intervetiars present rights to nilgjste TMl-related IISUBS
bnfare AOLB !, ftSLAD
. J F Commission 80/06/30 2pp
--5007210031 fick receipt of 000609 Itr commenting on policy atatcmmt for
Tin-related OL requirements Statement does not dlmlnlih
Intervenurs present rights to litigate TM I -re late if lnuei
before ASLD ti ABLAO
AHEA3NE.J F Commission 00/06/30 Bff
— B 007 HI 0041 Comments oi> poljcy statement for TMI-rolated OL
t- equirements intervenors nhould be allowed to litigate TMI-
-B01)7a«04'jn foruiirdi itustri p li in. of ncltnns
aitsd for nciu |>ou>or plant!, (. Tor r.idu.isti
QOOflOl ropt recommundntiijiia Ufa end
AHCARMIsiJ T CiimmisBion 00/O7/10 lp
Sheldon, Harmon !< Weiss CO^Od/09
3pp
— B0072400SO Commente on policy ifcatement for TMI-rnlatod OL
reqifirBments NDC fail* to understand requirement) aP
administi.it ive due process
JORDrtN, W B Sheldon. Harmon, t, Weiss 80/06/13 4pp
8007310209 Meekly Info rept For ut ending B007I1
HEHM.T A Office of the Eiecutwe Director for Dporatlont
BO/O7/17 2Bpp
re HID of eiistlng nuclear
storage, per OAO
Toriunrds dpttcrlption of nctiunn re use of eiistlng nucliir
sitet for neu poucr pi nil to t< Pur ijiduiiste- sturaflei por OAQ
BO0101 ropt ret ommcndationn H/ u one 1
E. J F Comminsion 00/O//10 lp
— Bu073104lP7 Forujnrdo description of nctlons re use of eilating nuclear
situs Por iu'u punier plants (. Fui rnduraato storage, per OAO
1)00101 rep I recommendations
AtlEAHNC. J F Commission HO/07/ 10 fipp
D007B30007 Ack roculpt nf flOOhH ] Itr re neu lAErt training program
course Schedule c omml tmento uuuld limit availability) to
glva re<iucDteiI Informal lecture
HENDBH p J 1 Cnmminoion HO/07/02 lp
— OOQ72900IO Citiinda Invitation ti> give informal lecture on B00924 for
nuu Ii^Crt nuclear pouier training program Course calenders t>
oittllno one)
RDCCRfl.l Araonne Kfltional Laboratory QO/Ofi/SO lp
HOD739002S FDruard* C ommistl oner Ronimdg lecture given at Drown Unlv
Ctr far Cnorgij (HudteO-iln ruapnnso to ritquest Mitre Corp
itudg ro f eronced in Honnrtlij Itcturu i<i C Zrakut t< H Bcholl
del \1T> "Solar Enargij ijyo (. Hiiniiurceo " W/o oncl
BC1FCRT,(; W Commisiiion IWOS/JO lp
— OOQ7S900SO RtquuEti written copy nf fiOO'lS? lucture protintei) befor*
Croun Untv Ctr For Lnorgij 'Hiidios Aim renuests
Idcnt 1 Picntinn of Mitre Corp «ludi| roPore-nceil In lecture
CURMIOAN, J J Indliino FltoLo Unlv 00/03/14 lp
BQ0723uO>"7 roruiarJt> "NHC tlemlamiual Dopt to Congress on Status of
Domv>Ut k Inll Evaluations (if Muclenr Fuel Cijcle E^B "
Conarola should i ol ievo N'lC af r oapnns I b 1 1 1 tg for further
repfc» due to other rotmurco nrlnrillet U/o end
P Caoimiodiflli FJO/07/07 lp
rnrw.iriln "NRC ClDmlanitual Kept to CnnorBss on Status of
Domuollc t, Intl EIvaluatlDnn of Nuclear ronl Cycle 8y« "
Cungrntl ofiould relievo NflC »f ro Bpono ib 1 1 1 ty for further
repta due to oilier r-ooourcu prlorltiea H/o encl
AHEAHNb.J f Commission IIO/0//09 lp
H007H300H3 I'rovidos Oiibcommi ttoe oil Cimrgu, Nui loar Proliferation &
federal f!vci ui/ "HttC Semiannual llupt to Conijreii on Status
[if Domestic b Intl Fvaluattons of Nucluor Fuel Cgcle Ggs "
H/o enc 1
P Commission HO/07/ 09 lp
ao07W500tlV Prpvttlai tliiltrnnunl tie*- nn Arms Control, Qcvans h Intl Environ
u/ "NF1C Snrni nnniin 1 Ftept to tungrpat on Statue of Domestic !•
Intl Fvaluntlon* of Nuclear f-uel Cgcla SVB " Nfl(^ >hould b«
rell«v«d of i ssponsi bl 1 1 tg for further rentg W/o end
F Commiiision BO/07/09 lp
3007240480 Foryariis description of aetloiiB re uia of eilatlng nucleor
sites for neu pouer plants I> fin- rfltjuaiie storagctper- OAO
BOO ^ 01 rept ret ommenilfl tions M/o end
AHEARNG, J F Commission BO/07/10 lp
— SOD7H4Q9Q1 Pmvidec Biibccmmi t tee nn tnergy * Environ ui/descrlptlon of
actlnnG r« use of eiltting nifdear sites for neu pouer
plants !< for radiiiaste aloragff, per OAO B00401 rept
retBtnmBnilflti ona W/o oncl
AHEAHNE.J F CofnmlBalOn BO/07/JO lp
— B0072'10*FJ3 Provides Subrommlttee on Nuclear Reaillfltlan w/detcrlp t ion of
occians re use of eilsting niidenr sitaa for nou poujer
plants & tar- raduia*t* storage, ner QAO 800401 rsjit
recommendations W/o etict
F Cummlsiiori BO/07/10 lp
B00731'10<ia7 Provides Sulicommi ttoe on Energg Ji Power bi/dascriptlon af
actions re us-e iif cilitinq ni'doar aitRi for nflw power
plants '< iai radwaste iturayi1. per CAP B0040-) rapt
retatrnEndatlOTit W/o encl
AHEARNE-J F Commi S» ion BO/07/10 !p
-0007330090 rorutrdi "NFIC Elemlnimual Rept lo Congress on Status af
Dn-mestlt d Inll Cvaluulionit cif Nuclear Fuel Cgde Sgi "
Congruii oliould r«lt*vu NRC op responilbl 11 tg for Further
I'upti due to other reaourca nriorttlvB H/o encl
AHCAIINE.J [ CudimlHSion HO/0//09 lp
'B007U90101 I'rovldBU Bubcnmml ttoe an Envt ron, Energg t> Natural Desourcet
ui/ "UnC 8«mlannunl Rept to Cnngroas on Dk*tus of Domestic ti
Intl Lvnluiittont of Nuclear 1'uol Cgcln BUI " NRC ahould be
relieved of reiponsiJil H tg for further reptn W/o ond
AHEAIINE.JF ComnilsslDn 00/07/07 lp
-00073S0109 F>rovlde» [iubcnrnmi t te» on Cnergg b Pouter u/"NRC Semiannual
Runt to CanoreB* on Statue of tttimostlc ti Intl Evaluation!
of Nuclear Tuol Cycle au* " NflC «h«ul<l b» relieved of
respnn«lbl] I tij- Pur f-urllier reptn W/o and
AHFAHNE.O r Commission DO/07/09 lp.
-B0072S01H Provideu Subcommittee on Energy & Environ
»/ "UI1C ScmlfliiniiHl llept to Cannrost on Btntut of Domeitlc tt
Intl flvnluutioni iif Hucloar Puul Cijcla Bye " NRC ahould nt
of roi|iontibli Itij fur further rapttt W/D uneJ
Jr CnmniKititn HO/-07/09 lp
NONDOCKETED ITEMS
367
— B00723OI1B Provides Subcommittee on Nuclear Regulation
ai/ "NRL Semiannual Hept to Congress on Status of Bomestic
Intl Evaluations of Nuclear fuel Cycle Sys " NRC. Ghould b
relieved of responsibility for further repts W/o encl
AHEARNE, J F Commission BO/07/O9 ]p
— BOO72TO337 Disuu5-.P5 <l mill I egulatipn* that should be adopted tc
enable State of MM to meet requirements of UMTRCA State
should talc rjcrion on differences between RTAX & Environ
Improvement Div recnmmendd 1 1 ons as discussed in end
HEFiR.G U Office pf State Programs. Director SO/O3/2O 4pp
—8007230137 "NRC Rept to Congress or
Evaluations of Nuclear Fuel Cyclt
» Commission 60/01/30 3pp
Status of Domestic & Intl
Sys •'
BOD733O111 Responds to Samford Univ B00627 invitation to speak on
Cordell Hull Speakers Forum program Requests to be listed
• s possible speaker approi BOI113,due to schedule
cornrni tnonts
HENDRIE. J M Commission BO/O7/O7 ip
B0073G006B Ac k roceiflt of 1 tr o. pressing appreciation For NRC
assistance in heal ing lait fall Advises of Commissioner
inability to attend SSiED meeting
KENNEDV.lt T Commission BO/OS/06 Ip
— BQ07300O74 Eipresses ,ippr ei lat i on foi Commission assistance o
emergency radiologiral pi anning> pnjiron monitoring !.
transportation hearings Findl rept available from hearings
CARTER, A R Sugtl, (srolin.i, State of BO/D4/24 Ip
— B007230117 E*tends invitation to speak on Cordell Hull BpeakH
at Samford Univ during Bept-Nov 19BO
WILLIAMS. J E , MILLER. J Q Affiliation Unknown BO/06/27
BOQ730003B Weeklij info rept For uk ending 800717
REHM, T A Offno of the Ciecutwe Director Far Operations
BO/07/33 30np
B00733D2O2 Comments on H R 6745. Radiation Control Act of 1<?79 does not
lupport bill Dill doeas not improve overall protection of
public or promote effective federal research program
AHEARNE, J F Commission 80/07/03 2pp
— B007250aiS Requests vieiuB on one 1 H H 6745, Radiation Control Act of
1979
8TAQQERB.H O House of Rep SO/O3/21 12pp
NttC CONTRACTS AND HDUiriUflTIQNS
B00701O3BO Notif iLalion of contract iMecut ion, Mad S to "Sys Analysis
of Shallow Land Durial " Contractor Science Applications.
Inc
SMITH. P A Technical Assistance Contracts Branch FIN G-642S-9
BO/06/OB Ip
BOQ72SQ611 Discusses O004O2 Itr to NRC stating that Figure 4 of BECY-
80-107 is erroneous Thermodynamics of i irconium-steam
1-eaction uere, in fac ti conii dered in NRC calculations
Discussion paper re thermodynamic considerations end
DENTON, H n Office of Nuclear Reactor Regulation* Director
BO/03/29 ISpp
— B007250631 Eipresses opinion that that Figure 4 op SECV-BO-107 is
erroneous because thermodijoamic E of i irconi urn-steam
reaction mere not considered Supporting documentation encl
LEYSE.R H Affiliation Unknown BO/04/02 20pp
B0072S0721 Response to inquiry re DW/i relief valve discharge piping
Requirements for fabrication !< inservico insp of containment
components are being developed by ASME Code Containment
Working Groups
DENTON, HR Office of Nuclear Reactor Regulation, Director
BO/07/09 3fip
0007280137 Responds to 800520 !< 0513 Itrs expressing concern re
procedures in proposed rulemnking on storage tt disposal of
nucltar uiaste Forwards QOO52B order re working group to
monitor development of record
AHEARNE. JF Commission BO/06/12 Ip
B0072BO1A2 Ac k receipt of 000523 1 tr eipresainn concern ro future role
of Ofc of State Programs NRC remains committed to preserving
close working relations w/Dtatns & Conference
AHEARNE, J F Commission no/Oi/19 Ip
— B0072B0170 forwardo resolution requesting Commission proceed ui/eaution
in delibDrolion E< actions re reorgani lation of NRC Dfc of
State Programs has provided agreement states u/lnfo vital to
programs d improved NRC/state relations
PARRDTTi M W Conference of Radiation Control Program Directors,
Inc 80/03/23 2pp
B007BB0722 fiespondB to B00121 request for rept on plans for full-time
monitoring of vital nucluar pouier plant operations Presently
planned resident inspector program in conjunction ui/nuclear
data link mill provide sound program Related data end
AHEARNE, JF Commission SO/O6/12 5pp
— B0072B0729 Requests vieuis re desirability of installing nuclear data
link h characteristic: if Installed
GILINBKYi V Commission BO/03/O7 Ip
— 0007380729 Requests rept on Full-time mnnitoring of vital nuclear pouer
plant operations Resource requirements of plan should be
specified Range of alternatives for insuring continued
federal presence in control room should be provided
* Office of Management !, Budget SO/OI/ai ip
8007290347 Discusses NRC concerns re State of NM program for regulating
U mills d mill tailings Lists provisions not approved by
Environ Improvement Doard which should be included in
program to comply ui/UMTRCA by 811111
AHEARNE, JF Commission 80/06/12 3pp
— Q007Q103S2 Mod 2. deleting ref to UP Dura in Article B & substituting JA
Btoddarri, to "Sys Analysis of Shallow Land Burial "
TREvlNO.T Science Applications. Inc DOUGHERTY. D J Division of
Contracts FIN B-i42B-9 NHC-02-79-032 SO/Ofi/OB Ip
BOO701O6I3 Notification of contract uxecution. Mod 6 to "Commercial
LMFBR Safety Study " Contractor Uniu of CA at Los Angeles
JACOBS. A Research Contracts npnncii TIN D-3O19 80/06/16 Ip
--QOO7O10619 Mod 6, revising scope of work for Tatks 1 !< S eitunding
period of performance until BO 09 JO tt providing addl funding,
to "Commercial LMFBR Safety Study "
DHILLQN.H California. Univ of, Los Angeles MORTON, K V
Research Contracts Branch FIN B -3019 NRC-04-76-244 80/06/16
2pp
8007010624 Notifiration of contract eiec uti on, Mod 3 to "Evaluation at
Retention t. Migration Data from Natural & Inadvertent
Repositories " Contractor Stanford Univ
JACOBS, A Research Contracts Branch FIN D-4341 80/04/16 Ip
— 8007010627 Mod 3,eitending period of performance to B00630. to
"Evaluation of Retention Si Migration Data from Natural &
Inadvertent Repositories "
GUBTAFEuN.F A Stanford Univ MORTON, K V Research Contracts
Branch FIN B-6341 NR( -04-7B-266 BO/O1/16 2pp
B007020007 Notification of contract elocution, Mod S to "Historical
Seismlcitv & Lnte Cenoiolc Faulting in AZ.Part I,"
Contractor AI Board of Regents
HAGEY.H A Research Contract* Branih FIN D-679B NRC-04-79-212
BO/OD/15 Ip
— B00702O009 Mod 2. intending period of performance to B01231, to
"Historical Snismicitij !• Late Ceneioic Faulting in AZ, Part
I "
CARR.SE Arilona, State of MORTON, H V Research Contracts
Branch FIN B-6790 NRC- 04-79-21? BO/05/1S Ip
8007020024 Notification of contract elocution, Mod 3 to "Quantification
Classification of Two-Phase Flou Regimes Using Global ti
Local Neutronic Perturbations " Contractor Unlv of WA
JACDBS.A Research Contracts Branch FIN B-6324 NRC-04-7B-245
SO/03/2B Ip
— S007O2002B Mod 3. entending penotf oF performance to DO 0930, to
"Quantification Classification of Tmo-Phaso Flow Regimes
Using Global t< Local Nfutronic f'erturbat ic-na "
TREIBEL.U C Washington. Univ of MORTON. K V Research
Contracts Branch FIN B-6324 NRC-04-7B-245 BO/Q3/28 2pp
B 007020 3 Bfa Notification of contract elocution, Mod 3 to "Source
Document Microfichp b Duplicates " Lonti actor Microtech
Industries, Inc
HAQAN. T r AilminH.trative Contracts Branch FIN B-6357
NRC-10-79-691 80/06/10 Ip
— 800702039H Mod 3. revising billing procedures for pickup* !• delivery, to
"Source Document Murofiche ?• Duplicates "
* Microtech Industries, Inc MATTIA, M J Administrative
Contracts Branch FIM B-6J57 NRC-10-79-6S1 SO/06/03 2pp
368
NONDOCKETED ITEMS
BG07O2D542 Notification of contract e.ecuti on. Mad 3 to "Measurement &
Stds Development For Nuclear <Matl Eafguards " Contractor
NOS
GUSTAVE.R P Research Contracts Branch FIN D-60169
NRC-O1-79-011 QO/06/1O lp
-- H0070E0553 Mod X revising Slope of uurk to include changes proposed in
MQS 770103 Itn to "Measurement *i Btds Development for
Nuclear Mat] Safeguards "
BHREVEi D B Commerce. Oept of MORTON, K V Research Contracts
Branch FIN 0-60169 NR< -01-79-O11 QO/O6/10 If!
G007O2OS73 Notification of contract execution, Mod 5 tii "Technical
Assiatante in Development of Regulatory Framework for
Nuclear Waste Mgt " Contractor BDM Corp
SMITH. P A Office of Hucloar Material Safety t, Safeguards
NHC-Q2-77-201 - | 7 80/06/18 lp
BQ07O70037 Mot if ication of contract elocution "Licensing Technical
Assistance, " awarded to Science App 1 icat ins. Inc
EDGEUCRTH.P J Technical Assistance Contracts Branch FIN-B-6934-O
NRC-02-00-03504 BO/G6/OS lp
B00707Q052 Mod 5i t?» tentf ing period of performance until 810630 to
"Technical Assistance in Development of Regulatory Fromeuork
for Nuclear Waste Mgt "
P1CKARD.WC Synergy, Inc DOUGHERTY, D J Technical Assistants
Contracts Branch NRC-03-77-201-23 BO/Ofa/lB lp
— B007070094 Mod 4,c"teniling period of performance until S1O630 to
"Technical Assistance in Development of Regulatory Framtuork
for Nuclear Haste Mgt "
HEUJ1Q.R A Donovan, Haweater t< Rattlon, Inc DDUOHERTV, D J
Technical Assistance Contracts Branch NRC-03-77-2O1-34
SO/06/10 2pp
B007O3Q73Q Notifnation of contract elocution, Mod 2 to "Subscriptions
to Inside- NIK, " Contractor McGraui - Kill Pun 1 ish ing Co, Inc
FLYNN.M J Administrative Tqntracts Branch Nf?C- 10-79-663
gO/06/Oi. lp
— BC07Q20731 Mod 5, increasing total number of subscriptions from 43
to new total nf 4?, to "Subscriptions to Inside NRC "
COLLINS. P McGraw-Hill Publications Co HATT1A.M J
Administrative Contracts Branch NRC-10-79-663 BO/0&/06 Spp
OOD703OOt)f3 NotiFlta tion of contract execution. Mod S to "Technical
Aisistance in Development of Jlegulatory Frameuork for
Nuc 1 ear Wasto Mgt " Contractni* SouChuiest neiearch Inc
SHIT»,I> fl Technical Asslstani e Contracts Branch NRC-02-77-201-4A
BO/06/13 lp
— S007O30071 Mod P.D'tunding period of performance through 000631. to
"Technical Assistance in Development of Regulator Trameuork
for Huclear Waste Hg t "
GinOEL, S H Southwest Research Institute DDUQHEIiTY, D J
TeEhnicfll fteslstanco Contrflcts Branch NRC-02-77-S01—14
QO/O&/13 Spp
0007030336 NotiPicfltion of contract elocution "Statistical Analysis
Study to Assist NFiC Senior Personnol Mearlng Counsel In
Preparino for Pending Equal Employment Opportunity Class
Litigation " Contrinc tar 3\. Uolfbein
FLVNN.M J AdmtnistralivB Contracts Branch NHC-10-BQ-694
lp
— BOQ703D3-14i Contract "Gtatistl ca I Analysis Study to AlsUt NRC Senior
Personnel Hearing Counsel in Preparing for Pending Equal
Employment Opportunity Class Action Litigation." auarded to
SL Wolflieln
" Wolfnsin, 1 L NnC~10-BO-6'J4 BO/Oii/lH S9pp
B007030337 Hatificatinn of contract eiecution "Licensing Technical
Assistance," awarded tn Science Applications! Inc
EDQEWOJITH, P J Technical Assistance Contracts Branch FIN B-&938-0
NRC-Oa-BO-03505 30/06/09 ]p
B007030353 Nnttficat«on of controct e*ecutl on, Mod 3 to "Technical
Assistance In Development of Heo,ulatory rramework for
Nuclear Wast u Mgt " Contractor WAP 00 A Inc
SMITH, P A Technical Assistance Contracts Branch NFIC-03-77-201
BO/C-fi/13 lp
— B0070303S7 Mod 3,B<tenoing period of performance for oni addl yn to
"Terhnteal AEBialancB in DevelopmHnt of Res"lato"'y Frameiuork
for Nuclear Waste Mgt "
KINO, W A WAPQfiA, Inc DDUOHERTV, D J Technical Asslitance
Contracts Branch Nnc~03 77-201-36 80/06/13 Spp
aoO703O369 Nc-tificfltinn of contract elocution. Mod 3 to "Technical
Assistance in DBvolapfliBn.t of l?i>gu]akary Framework Por
Nuclear Waste Mgt " Contractor Teknekron. Inc
SMITH, P A Technical Assistance Contracts Branch NRC -03-7 7 -301 -IB
00/B6/1B ip
0007070031 Notification of contract elocution. Mod 9 tn "Technical
A*st!tance in Development of Rojulatory Framawork for
Ni)cl«ar Waste Hgt " Contractor SC3 Engineer)
SMITH, P A Technical A*«islance Contracts Branch NRC-03-77-E01-21
BO/OA/l£t lp
B00707QO33 Notification of contract elocution "Licensing Technical
Assistance'" awarded to Science Applications, Inc
EBQEWOF1TH, P J Technical Assistance Contracts Branch FIN 0-6947-0
B0/0(,/03 1 p
— 0007070057 Mod &, c» tending period of performance until 810630 to
"Technical Assistance in Development of Resulatory Frameuior*
for Wo clear Wste Mgt "
COHENiS Teknekron, Inc DOUGHERTY, D J Technical Assistance
Contracts Branch NHC-03-77-201-10 BO/O6/1B lp
— 900707 00 5 B Mod 9,B>tending period of perf ormanc D until HI 0630, to
"Technical Assistance in JJevel opmont of r?oH"latDry Framework
for Muc'ear Waste Mgt "
CONRAD, E T SC9 Enoineers, Inc DOUOHERTV. D J Technical
Assistance Contracts Branch NRC-Oa-77-201-Sl BO/06/1B lp
— 0007070060 Mod 5,o"tending period of performance until HI 0630, to
"Technical Assistance in Development of Regulatory Frameuor*
for Nuclear Waste Mgt "
WALBH, fl Q BDM Corp DOUGHERTY, D J Technical Assistance
Contracts Hranch NffC-Oa-77-201-17 BO/06/ IB lp
— B007070063 Mod 4, extending period of performance until S1O630, to
"Technical Assistance In Development of Regulatory Framework
for Nuclear Waste Mgt "
BTOLLER.B M 3 M Btoller Corp (suba of Arthur D Little, Inc )
DOUGHERTY, D J Technical Assistance Contracts Branch
NHC-02-77-201 -27 BO/06/ IB 1 p
0007070065 Notification of contract eiecutl on, Mod 4 to "Technical
Assistance in Development of Regulatory Framewort For
Nuclear Uaste Mgt " Contractor Donovan, Hammestor & Haitian,
Inc
BMITH, P A Technlral Assistance Contracts Branch NRC-02-77-a01-34
aO/06/10 lp
0007070129 Not* Ficatlon of contract elocution, Mod 1 to "Computer
Output Microfilming *i Production of 33 mm, Aperture Cards "
C-ontractnr Microtech Industries, Inc
HASAN. T E Administrative Contracts Branch NF1C-10-HO-361
SO/ 06/10 Ip
— 0007070134 Mod 1. revising billing procedures for piclup* b delivery
to "Computer Output Microfilming t, Production of 39 mm
Aperture Cards "
RUOCCHZa.JP Microtech Industries, Inc MATT1A.M J Division of
Contracts NRC-10-eO-361 BO/06/10 2pp
QOO70704H Notification of contract eiecut ion, Mod B to "Implementation
of Eiecutive Development " Contractor Projects Associates,
Inc
HDVLE.A Administrative Contracts "ranch NRC-10-79-36B, BO/06/1B
— BOQ7Q7O4IB Hod 2, extending oplration date to 800930 to " Imnl ementati pn
of Executive Development "
CDNVERBANO.E Project Associates PERLMAN. J Division of
Contracts NRC-10-79-36B BO/06/ IB lp
BDQ7090DB4 Notification of contract execution "Licensing Technical
Assistance," awarded la Science Applications. Inc
EPQEVJOHTH, P J Technical Assistance Contracts Drench FIN B-69B2-0
N!tC-03-flO~035 BO/06/03 lp
BOO7100010 Notification of contract elocution, Mod 4 to "Technical
Assistance in Development of Rogulatory Framewort for
Nuclear Haste Mgt " Contractor SM Staller Corp
BMITH, P A Technical Assistance Contracts Branch NIC -02 -7 7-201 -37
30/06/18 IP
BOO71000I1 Notification of contract execution. Mod 5 to "Technical
Assistance in Development of Regulatory Framework for
Nuclear Waste Mgt " Contractor Sunergyi Inc
BMITH, P A Technical Assistance Contracts Branch NRC-02-77-S01-23
80/06/18 lp
NONDOCKETED ITEMS
369
8007100109 Nntlfication of contract o t BC uti on. Mod 3 to "Review of San
Onofre Units 253 Slip Rate >, 5 Magnitude Study "
Contractor DD Slejnmons
THAQESER.C M Purchasing Section Fin B-faB70 NnC-03-79-146
BO/Oi/lB Ip
— B007t00112 Hod 3. increas ing funds. E i tend ing eipiration date to 800730
It increasing manday effort from 40 to 39 mandays to "Review
of San Onofre Units 3 t. 3 Blip Rate vs Magnitude Study "
BLEhMDNS, D D Slemmons. D B PERLMAN, J Division of Contracts
FIN B-6B70 NRC-03-79-146 BO/O6/1B Ip
8O071OO304 Noti f itati on of contract e i ecuti am Mod I to "Purchase &
Maint of Multichannel Analytical Equipment For NRC Regions "
Contractor Nuclear Data, Inc
HASAN, T T Administrative Contracts Branch FIN Q-1005
NRC-05-BO-254 8Q/O6/ 10 1 p
— BOO7100312 Mod lire-vising acceptance t, billing provisions t. correcting
administrative error, to "Purchase !< Maint of Multichannel
Analytical Equipment for NRC Regions "
RIZZO.R R Nuclear Data, Inc MATT I A, M J Administrative
Contracts Branch FIN B-1O03 NRC-05-BO-35-5 GO/06/10 3pp
—8007110521 Hod G.eitcnding period of pur f ormarscB !< ndding aildl
reporting requirements, to "Loan Agreement Betuoen State oF
IL.DUT «< NRC to ComluLl JoinT Study nn Transportation of
Radioactive Matl in IL '
KEMPINERS,W L Illinois. State of IIATTJrt.N J Administrative
Contracts Branch BANTHAN, L D Franspor ta t ion. Dep t aF
NRC-06-7B-3SB BO/07/03 2pp
BOO714O39O Notification of contr
utloh, Mnfl 2 to "Technical
Assistance in Development of Regulatory Framoiuork far
Nuclear Waste ttgt " Contractor 1RT Corp
SMITH. P A Administrative Contracts Branch NRC-Q2-77-301 -40
BO/O&/19 Ip
BOQ7I4Q636 Notification of contract e.ecution "LicenEii'
As 5i static e. " awarded to Science Applications. Inc
EDQEWQRTH, P L Technical Assistance Contracts Branch
NRC-02-BO-035 60/06/05 Ip
Tac h nica 1
FIN B-6?53-0
-ded to
— B00714O633 Contract "Licensing Technical Assistance.1
Science App 1 1 cat i ons. Inc
* Science Applications. Inc DDUOHCRTV. D J Technical Assistance
Contracts Branch FIN U-A953-0 NltC-OS-BO-DIS BO/Ofc/05 3op
80O7lOQ3il Notification of contract execution "Nondestructive
Examination <NDE) Mobile Van, Region I," auiartfed to Mobile
WIGGINS. E J Administrative Contracts Branch
Ip
NRC-QS-80-359
— G007I0036B Contract "Nondestructive Eiamination (NDE) Mobile Van.
Region I." ayarded to Mobile Sys
HIHhlELiJ J Mobile Systems MATTIA.M J Administrative Contracts
Branch NRC-05-BO-299 BO/Oi/lB i3pp
0007110335 NatiFication of contract eiecuti on, Mod (b to "Coordination
of Federal/State Radiation Control Activities & Assistance
in Solving Radiation Control Problems " Contractor FDA
FLYNN, M J Administrative Contracts Branch FIN B-1620
NRC-Oi-7t-247 QO/06/SO Ip
— 8007.110539 Mod 6. setting forth effort for 1930, eilending period of
performance t, providing addl funds, to "Coordination of
Federal/State Radiation Control Actlvitios fc Assistance in
Salving Radiation Control Problems "
CROWN, H M HEW, Dopt of. Food << Drug Administration MATT I A, M J
Administrative Contracts Branch FIN B-1620 NRC -06 -76 -34 7
BOJOh/20 2pp
B00715004S Notification nf contract eiecution, Hod S to "Technical
Assistance in DEvelopment of Regulatory Framework for
Nuclear Waste Mg t " Contractor Soqis) Research Application
Corp
SMITH. P A Terhnical Assistance Contracts Branch NRC-Q3-77-30 1 -A3
BO/06/19 Ip
3007130093 Notification of contract oiccut ion, Mod 4 to "Technical
Assistance In Development of Regulatory Onmeuiork fur
Nuclear Waste Mgt " Contractor GED-Ctrs, Inc
SMITH,P A Techniral Assistance Contracts Branch NF?C-02-77-201 -3S
80/0i/19 Ip
00O7 130060 Notification of contract elocution, Mod 4 to "Technical
Assistance In Devplopment of Regulatory Framework far
Nuclear WaatB Mgt " Contractor R Stone >< Co
SMITH. P A Technical Assistance Contracts Branch NRC-O2-77-SO1 -3D
BO/0&/19 Ip
B007160208 Notification of contract eiecuti on. Mad a to "Cgnaulting
Svcs Jn Connection W/NRC Antitrust Huaringa " Contract-or
Barbay Engineers
8HEU.D Technical Assistance Contracts Branch F1M B-1119
NRC-03-76-273 BO/07/02 Ip
8007110559 Notification of contract execution, Mod Z to "Technical
Assistance in Bevelopment of Regulatory framework for
Nuclear Waste Mgt " Contractor lidraan Sciences Corp
SMITH, P A Technical Assistance Contracts Branch NFIC-03-77-201-43
BO/Ob/19 Ip
8OD711C372 Notification of contract eiocut ion. Mod S to "Consulting
Svci in Connection M/NRC Antitrust Hearings " Contractor
Miner & Miner
FOSTER, J Tochnicsl Assistance Contracts Branch FIN B-H19
NRC-03-7A-a73 SO/06/ 1 3 1 p
— B007110373 Mod 2, deob 1 inating funds t. closing out contract, to
"Conaulting Svcs in Connection W/NFfC Antitrust Hearings "
MEYEnS.C W Miner fc Miner, Inc DOUGHERTY, D J Technical
AiaiBtanCB Contracts Branch FIN D-1119 NHC-Oa-76-273
80/06/13 Ip
— 8007160337 Mod 9, closing out contractito "Consulting Svcs in Connection
U/NRC Antitrust Hearings "
DROOKS.f M Darbay EnglneerB, Inc FIN D-1119 NHC-O3-7A-a72
BO/07/03 Ip
B0071fc0490 Mod a.Ditcnditig period of performance- until BI0630,to
"Technical Assistance in Do\ eltipmont of Regulatory Framework
For Nuclear Waste Mgt "
BDWNE.W D 1RT Cnrp DOUGHERTY, D J Technical Assistance Contracts
Branch NRC-03-77-201-4Q 90/06/19 Ip
— 0007160496 Mod 2ieitending period of performance until Qi 0630, to
"Technical Assistance in Development of Re-Q ulatorij rramauork
for Nuclear Waste Mgt "
LEWIS. C Social Research Applications Corp DOUGHERTY. D J
Tuchnical Assistance Contracts Branch NRC -02-77-20 1-43
80/06/19 Ip
B00714O20O Notification of contract eiecution "ADP 9ys Support,"
auardHd to Technassoc iaLes. Inc
FLYNN, M J Administrative Contracts Branch NRC-10-30-673
BO/06/30 Ip
— 0007140203 Contract "ADP 3ys Support," awarded to Technassoc lates. Inc
ZENTNER.H A Technasaoc iatea, Inc COLLINS. F M Division of
Contracts NRC-IO-aO-673 BO/06/30 79pp
800714O^1O Open Solicitation RS-ADM-BO-669 for contractor to place neui
b reneiiial subscriptions For domestic d foreign periodicals,
serials !i other relatnd svcs at agency price & guarantee
delivery of all Issues on each subscription
MATTIA.M J Administrative Contracts Branch 80/06/16 69pp
B00714OS12 Notification of contract execution, Mod 3 to "Loan Agreement
BetuiRen State of IL, DOT t< NRC to Conduct Joint Study on
Transportation of Radioactive Matl in IL " Contractor IL
Dept of Public Health
FLYNNi M J Administrative Contracts Branch NRC-06-7B-33B
SO/07/O3 Ip
— 800716049B Mod 2, ci lend ing period of performance until PlQi30i to
"Technical Assistance in Pevnlopmont of Regulatory Framework
Par Nuclear Waste Mgt "
MARRAM.E P Oeo-Centers, Inc DOUGHERTY, 0 J Technical
Assistance Contracts Brani-h NRC-03-77-301-33 QO/06/11? Ip
— 8007160504 Mod 4. extending period of performance until Q 10630, to
"Technical Assistance in Development of Regulotorg Frnmeuork
for Nuclear Waste Mgt "
KAHLE.R Ralph Stone I. Co DOUQHERTV.D J Technical AssiKtanco
Contracts Branch NBC-02-77-301-2B 80/06/19 Ip
— SO071i03ia Mod B.pitending period of porform.ince until 310630. to
"Technical Assistance in Development of Regulatory FramEuiorl;
For Nuclear Haste Mgt "
BRIDGES. A P Kaman Qcienres Corp DOUQHERTV, D J Technical
Assistance Contracts Drouth NRC-02-77-2(H -43 HO/O6/19 Ip
8007170122 Notifiration of contract execution, Mod S to "Survey
Instruments " Contractor Ebuilino Instrument Corp
MEDROH.L A K Administrative Contracts Branch TIN B-1315
NRC-05-79-262 BO/07/OB Ip
NONDOCKETED ITEMS
9 Mod .1, tier rpasing funds to 'Sur/ey Instruments :l
Elerlin* Instrument Corp HAFTlft-H J Administrati
rts Branch FIN D-1,315 riKC-OS-T'J-SAa BO/O7/OB lp
on of contract o iecut i on. Mod 1 to "Dave lop
ogram in Support of UMTFICA " Contractor
T J Administrative Cont
-00-300 BO/07/1O lp
FIN B-le.33
)145 Mod I. unerasing funds t-o "Development of State Regulatory
ram in Support of UMTRCfi "
alifornia. State of MATTtft.M J Administrative Contracts
h FIIJ B-1653 U[iC-06-BO-3t)S 80/07/09 5pp
>~J Motif nation of cc-nti
tor Mabi le Sy s
.£ Administrative Cor
7^-257 (30.07/03 1 p
i EC ul ion. Ho-d 5 to "Habile Lab
i Branch Flfj H-1013
J1A1 Hod 3, decreasing Funds to "Mobile Lab "
U,J J Mobile System MATTIA. H J Administrative Contract!
•h TIN D-101-1 NHC-OS-79-2S7 BO/O7/CB lp
7 .Notification aP contract eiec ubion. Mod 1 to "Coal of
•ound Tests " Contractor American Mine Svts.Inc
Ml Administrative Contracts Branch NHC-O2-BO-09S
1 lp
1173 Mod li adding J Germundson to keij personnel under lhCost of
•ground Ti!5ts "
JGrtLL.A J American Mine Bervtt en, Inc rtATTlA.M J
HatratiVP Contracts Branch NRC-03-B1J-O53 BO/Oi/O9 lp
UQQ721OI22 Motif ication oF contract B let u tion, Mod 1 to "Develojunont of
State Re-gulatcvrg Programs in Support of U Mill Tailinae
Radiation Control Act " Contractor State of Nit
FLYNN,M J Administrative Contracts Draneh FIN 0-1633
NfIC-O6-BO-i7fc aO/Ot/3O lp
— B0072I013S Mo-d 1, adding Funds, to "Dove 1 npnent of State Regulatory
Programs In Support op U Mill Tailings Radiation Control
Act "
* NBLO rteiico, State of MfiTTIA, H J Administrative Contract*
Hrancfi FIM D-liS2 N(!C-Ofi-aU-i76 BO/0&/30 9pp
BO-0721O154 Notification of contract e lee u ti on, Mod 1 to "Dcvilopmant of
State Reoulatorg Programs in Support of U Mill Tailings
Radiation Control Act " Contractor State of CD
FL.VNN.M j Administrative Contract? Branch FIN U-1&S2
NHC-O6-80-3I I OO/Ofa/30 lp
— 9007210140 Mad I, adding funds to "Development of State Regulatory
Programs In Support of U Mill Tailing* Radiation Control
Act "
* Colorado. 3tate of MATTIA, M J Admint strati VH Contracts
Branch FIN 0-1653 NflC-Ot,-aO-31 1 HO/Ofa/30 Spp
S00731C333 Notification of contract Bipcution "Steam Qemr*tor
Modeling During Fteflood Stage oP LOCA. " awarded to MIT
DRDMBEtte, D Desnarc h Contrac to Branch FIW D-7329 NF1OQ4-BQ-219
eo/06/at lp
— B00721035B Contract "Steam Oenerator Modeling During Reflood Stage of
LDCA. " awarded 60 MIT
DUMHEFI, 0 If MaBsachcivetts Institute of Technologij MORTON, K V.
Rusflarch Contract* Branch FJN D-7229 NRC-04-30-219 80/06/Bi
7pp
B Notif nation of contract eietution, Mad 1 to "Development of
leijulatQr>j Programs m Support of U Mill Tallinn*
on Control Act " Contractor Stats at TX
i J Administrative Contracts Branch FIN D-1653
80-307 60/06/30 lp
1316 Mod 1< en tend Ing period of performance t Increasing funding.
EVBlopment of State Regiilatoru Programs in Bjpport of
1 Tailing! Radiation Control Act "
las, State oF MATTIA, M J fldmi nl stratlve Contracts Dranch
-1633 HnC-Ofi-aa-3O7 BO/Ot=/3Q lp
/ Notification of contract ei ecut i on. Mod 1 to "Word PrO:CBB*ing
Contractor Automated Correspondence Sijs, Inc
,R Administrative Contractt Branch NRC-IO-7H-S9B
6 lp
322 Mod fl, providing addl funds, to "Word Proctising Sve s "
itomatod Correspondent-!) Sijstflins, Inc htftTTIAi M J
.IBlratiVB Contracts Branch NRC-IO-7B-59D 80/06/30 lp
ii Notification of contract Elocution "Developnant op Autamatid
Selection BUS, " aurardcd to Gasser AssnclatesiP A
Adminiitrative Contracts DrantJi FIM B-1214
BO-253 BO/Od/27 lp
193 Contract "Devel opment of Automated Vendor Selection 9ys* "
ed to Usseer Assoc I (itua. P A
n,E R QaEEer Associato i. P A MATTIA, M J Admlrl Urn t i ve
acts Branch FIN B-1SH MSI C-05-B 0-333 BD/Ob/37 ESflpp,
I Notification of cuntract e i c-c ution. Mod 1 to "Deve 1 opment of
tgulatorij Pi-ogramE in Support oF U Mill Talllns*
on Control Act " Contractor State oF DB
J Administrative Contracts BrancN F1W D-li9a
BO-309 BOJQbf3O tp
BOD7210263 Notification of contract elocution "Environ Monitoring
Program w/Htate oP NY," awarded to State of NY
BftlSDEfl.L ftesearch Contracts Brancli FIN D-BIO? NRC-05-BO-a71
ao/oi/oi ip
— S00721Q3fc7 Contract "Environ Monitoring Program u/fltat» of NVj "
awarded to State of NY
LflNAHftM.M P Haui VorV, State of MORTON.K V Reasarch Contracti
Brancn FIM D-310? NRC-03-at>-271 QO/O1/OI leipp
BQ07210317 Noti Plcfltion of contract oiecution "ADP Su» Support,"
auarded to Email Business Administration Subcontractor
To chna-ss Delates Inc
FLYNM.H J Administrative Contracts Branch NHC-1O-SQ-&73
BQ/Qh/24 Jp
-- -B007210331 Contract "ADP Bys Support," aujardnd to Small Dullness
Administration •Subcontractor T*c hnaaeoc iatesr Inc
COLLINS, F M Small Business Administration CHILK, S J Office of
thB Secretary of the Commission lENTNERiH A Tec hnasaotiales,
Inc 00/06/34 77pp
QO07S4016B Hotificatlar af contract eiecuti an. Mod 3 to "Cast op
Underground Tests " Contractor American Mine Svcsilnc
CDL-EMAN.Ii rtdministrativ* Contracts Branch NF1C-OE-SO-OS3
BO /Ob/Of Ip
— B00734017O Mod 2. aitendlnfl contract term bg 1 mK, to "Co»t of
tJtic! erg round Te^ts "
* American Mine Services, Inc MATTIA, H J Admlni itratlvB
Contracts D ranch NHC-O2-BO-O55 BO/Oi/09 lp
— 9O07a4OJ73 COT>Plrns aareemt-nt lu/proposei) Pitension until B00728 for
contract completion
MCDOUOALLfJ Amor if an Mine Services. Inc HRC-02-90-035
BO/07/11 lp
93* Mod l.eitonding period of performance- & increasing funding.
evelDprnsnt of State Regulatory Programs In Support
.ill Tailings Fladiaticin Control Act "
egon. State of MATTIA, M J Adirnni strat l ve Contracts Branch
H-16SC NRC-&6-SO 309 E30/06./30 5pp
0007350356 Notif icatiofi op contract eiec ut i on> Mod 1 to "Sit*
Character! (at ion Test Programs " Contractor- Snider
Asanc I ates
GOLEM AH, R Administrative Contracts Branch NftC-OS-80-aS6.
BO/06/09 lp
j Nati Fication of contract executioni Mod 1 to "Development of
egulatorij- Programs In Support of U Kill Tailings
in Contrul Art " Contraitnr State of WA
J Administrative Contracts Branch FIM n-1633
3O-306 BO/06/30 lp
113 Mod 1. Increasing Funds, to "Devel opment oP State Regulators
ami in Support oP U Mill Tailings Radiation Control
shincjton, 'atate of
i FIN D-1653 NR
Afimini Btrative Contract*
BQ/O6/30 9pp
— 0007290963 Mod Ireitending period of p erformancB. to "Sit*
Character net ion Teat Programa "
* Ooldcr Ais-nciatee MATTJA, M J Admi nlltrativn Contri-ctt
Branch NRC -03-80-236 BO/O&/09 2p(i
BO&7S50569 Notification c*f contract eiBCUtl on, Mod 7 to "Stum-Hitir
Interfacial Transporit " ContractoT Northu»>ttrn Univ
KAOEV.H Research Contracts Dranch FIN D-61B0 NRC-04-77-09S
BO/O7/02 lp
NONDOCKETED ITEMS
371
— B0072S037B Mod 7, providing Funds for addl uiork scope, tn "Steam-Water
InterFacial Transport "
MINTZER.D Northwestern Univ MORTON. K V Research Contracts
Branch FIN B-ilSB NRC-Q4-77-033 BO/O7/O2 4pp
BOO72B0234 Notification of contract execution "Charac teri lati on of
Eiittlng Surface Conditions at Sheffield Lou Level Wast*
Site Disposal Facility-" auiarded to Hard ing-Lauson
Aisoc lates
LITTLE, M Administrative Contracts Branch FIN B-6970-O
NRC-Oa-BO-037 BO/07/O9 Ip
— 800726023* Contract "Character! ifltion of EiiBtino. Surface Conditions
»t Sheffield Lou Level Waste Site Disposal Facility. "
awarded to Hard itig-Lauson Associates
HE1M,G E Hardino-Lauson Associates PERLMAN. J Administrative
Contracts Branch FIN B-6970-0 NRC-02-BO-O37 80/07/09 lOpp
B007B8033B Submits Progress Rijpt 30 for June 1980 Site visit task
underway Itinerary enct
PLATO, P Michigan, Univ Of NRC-OI -77-180 BO/Oi/27 4pp
8 007280 320 Notification of contract eiecution, Mod 4 to "Effluent
Inventory By* on Sheffield Lou Level Watte Disposal Site "
Contractor NUS Corp
SMITH,? A Technical Assistance Contracts Branch NRC-OB-7B-035
BO/07/03 Ip
— 8007280527 Hod 4, adding addressee, to "Effluent Inventory Sys on
Sheffield Lou Level Haste Disposal Site "
EDMONDBON L R NUB Corp DOUGHERTY, D J Technical Assistance
Contract* Branch NHC-02-7B-035 80/07/03 2pp
80072 B 07 12 Noti f icatlon of contract eiecution, Hod 1 to "Site
Charac teri lati on Test Programs " Contractor Ooler
Associates
COLEMAN.R Administrative Contracts Branch NRC-02-BO-056
80/06/09 Ip
— B007S80717 Requests 1 ink extension to "Site Characteritatlon Test
Programs "
PENTZ.D L Qolder Associates NRC-02-BO-056 BO/06/09 Ip
BQQ7300577 Notification of contract enecution "Development of
Communications Consols Design. " auarded to Dendii Field
Enginterlng Carp
HOVLE.A Administrative Contracts Branch FIN H-1239
NHC-03-BO-290 BO/07/ 10 1 p
— B007300390 Contract "Development of Communications Console Design,"
awarded to Dendii Field Engineering Carp
ENOLE,N J Bendii Carp PERLMAN. J Administrative Contracts
Branch FIN B-1239 80/07/10 Spp
8007300979 Notification of contract e jncution, Mod 6 to "Electrostatic
Capping 8ve» " Contractor Potomac Research Inc
FLYNN,M J Administrative Contracts Branch NRC-17-77-153
80/07/11 Ip
— S0073O05B1 Mod 6> extending period of performance, to "Electrostatic
Copying Svc R "
BAUMANN, R O Potomac Research, Inc MATT1A, M J Administrative
Contracts Branch NRC-17-77-13S BO/07/11 Ip
8007300593 Notification of contract eiecution, Mod 3 to "Personnel
Neutron Dosimetrv for Nuclear Power Plants " Contractor
Rennselaer Polytechnic Inst
JACOH8.A Research Contracts Branch FIN B-6631 NRC-04-78-2i3
BO/06/27 Ip
— BO07300398 Hud 3, extending period of performance for seven monthsi to
"Personnel Neutron Dosimetry for Nuclear Pouer Plants "
LDOIUDICE.J M Ren»«»laer Polijtflchnic Inst MORTON, K V Research
Contracts Branch FIN B-6631 NRC-04 -76-243 60/06/27 Bpp,
B007310006 Notification of contract execution, Mod 2 to "Presentation
of General & Refresher Courses in Concrete Technology tt
Codes " Contractor Portland Cement Association
BAI8DEN,L Research Contracts Branch FIN X-117B NRC-OS-79-261
80/07/01 Ip
— B007310010 Hod 2, changing personnel, to "Presentation of Oeneral &
Refresher Course in Concrete Technoloog ti Codes "
* Portland Cement Association MORTDN,K V Research Contracts
Branch FIN X-117S, NRC-09-79-261 80/07/01 Ip
FINANCIAL DISCLOSURE INrCIRMATIGN
BOO70HO737 Infor
that confi rtcnt lal statemtnt of emp 1 nyraent !•
financial intcraats hat been reviewed Eiemption From
PTDV1S1DT15 of 10CFRO 735-21 must be granto-d in order to
allou ujork on licensing matters involving GE
VOLLMER.R H Division of Engineering BO/Q6/11 ip
BOO713006I Fopuards list of Div of Safety Technolosy employees In
grades GSI3-I5 h employees belou GS-13 in occopatl anal codes
of interest for luhum submission of tonf i iJent lal financial
statements are required
HATTSDN, R J Uivisinn of Safety Technolog-y BO/07/01 4(ip
8007300030 Advises that request for eiemption from 1OCFBO 733-31 is
granted !< participation in matters before MflC affecting
Uestinghouse permitted Interest in pension fund not so
substantial as to affect impartiality
VOLLMER.FI H Division of Engineering BO/O7/lfc Ip
FREEDOM OF INfORMATION ACT REQUESTS AND RELEASES
7Q1221O533 Foiuards IE Insp Rept 30-15032/78-01 on 781011 No items of
noncompl lance noted Insp included eiam of activities at
Pittsburgh office re radiation tafety !i compllante u/rulsa
fc regulations W/out rept
MCCLINTQCK.R 0 Region 1, Phi Ifldelph in, Fuel Facility t. Material*
Safety Dranch 7B/10/31 Ip
790630O335 Requests Elecutive Dranch poaition re OC application far
license to eiport sn detector assomblieE to India Foruards
790307 application H/n end
OPLINOER.O Q Assistant Director For Opart/ Imp or t t, International
Safeguards 79/09/15 Ip
7909110639 Responds to 790703 1 tr re approval of NHC action!
HENDR1E,J M Commission 79/07/16 Ip
B003070523 Ac* receipt of B00130 1 tr informing NUC of steps taken to
correct violations noted in IE Insp 79-01 on 791212
MCCLINTOCK. R Q Region 1< Philadelphia, Fuel Facility J, Materials
Safety Dranch BO/02/3& Ip
—0003090324 Responds to NRC 800109 1 tr re violations naiad In IE insp on
791212 Corrective actions discussed infractions u/
technicians involved Classes planned u/all technicians an
requirements ti restrictions
CARMEL.P Rad BBrvicos, Inc BO/01/.10 Ip
— 8005090327 Discusses IE Insp 79-01 on 791312 ti forwards notice ot
violation
MCCLINTOCK. R 0 Region 1, Philadelphia, Fuel Facility t. tutorials
Safety Branch BO/01/O9 Spp
— 8005090539 Notice of violation from insp on 791213 Nonc-omp 1 lanca noted
required radiation surveys nut performed on packages
received
» Region 1. Phi laflelphia. Office of the Director BO/O1/09 2pp
800SSOD366 Ark receipt of 8003 1C resolution in support ot nuclear
energy adopted tiy Northumberland County Board of
Supervisors Certain short-term tasks, Idantl t tut in TMI
Action Plan, must ho completed prior to 0\. issuance
HAMMERER, C Office of Congressional Affairs BO/O-l/HB app
8005870154 Submits legal opinion on tuo questions re operation of U
Mill Tailings Radiation Control Act ot 1970 KRC lias legal
authority to impose grounduiator protection conditions fc
concurrent jurisdiction over nonradlol og leal liaiardl
8HAPAR.H K Office of the Eiecutive Legal Director 80/04/23
57pp
6005290403 Ack receipt of 000431 Itr informing NRC of iteps taken to
correct violations noted in IE insp of License 37-13127-01
on BOD228
CROCKER, H M Roe Inn 1, Philadelphia, Office ot the Director
BO/03/07 Ip
— B00329Qi07 Responds to NflC BOD32B Itr re violfltions nottfl in IE imp op
License 37-1312B-01 on SOOaaB Corrective actions new
procedurBB will be developed to improve coordination in
receipt of incoming radioactive samples
K1M,S M Radiation Management Corp 60/04/21 Spp
— 8008390612 Diseussn IE imp of License 37-13139-01 on BOQ32B k
forwards notice of violation
CROCKER.HW Region I, Philadelphia, Office of tin Director
BO/03/2B 2pp
372
IMONDOCKETED ITEMS
— BOO5290616 Notice of violation from insp on BC023B Noncnmp I lance noted
failure to keep retcr-ds showing receipt of radioactive
samp la
• Region 1, Philadelphia, Office of the Director BO/03/2B lp
-B007010176 Submits description of data for propound jnint pellet-
cladding Interaction program Lists items for review. prior to
signing program agreement ui/BNWL
CHECK, P 3 Core Performance Branch 77/02/09 app
B00iii20'102 Discusses reasons for delays in licensing neu nuclear
plants, in response to 000434 requests re HA Cosgrove
tomments Belays caused by post-TMI efforts to improve safety
at operating plants
HAMMERER. C Office of Congressional Affairs BO/OS/2Q 2pp
HOO&12Q419 Responds to 800433 re L Nutter concerns about nuclear plant
siting Ie evacuation plans NRC not responsible for decision
re fcjheather on not nuclear power should Bust in US
Proposals to step nuclear power development not enacted
HAMMERER, C DFFice of Congressional Affairs 30/05/07 2pp
-000701Q101 Summary of 770i>15 meeting u/UUR fuel vendors in Bethesda,MD
re LHR fuel damage criteria, median! Bins it limits List of
attendees, agenda t; excerpts From SUPs encl
TOKARpM Core PerFormgnte Branch 77/06/33 llpp
'B0070I0187 Forwards brief summary of pellet-cladding info revieuied at
Chalk River Nuclear Labs Lists questions uhich arose from
efforts to establish Fuel rod failure probabilities from
Pickering-B bundle shift data
PANKASKIE,P J Battelle Memorial Institute, Pacific Northwest
LaUoralory 77/13/09 Spp
300701(3002 "AECL/flNWL Cooperative Pellet/Cladding Interaction Program "
PANKA5KJE.P J uYoofchaven National Laboratory MEYER, Ft 0 Core
Porformance Branch 77/11/30 19pp
— B007CHO093 Summary of 7401 1 A meeting fu/GE re fuel performance Onaito
iusp techniques, rede tor history t> failure mechanisms mere
djscussefl Lists GE cone lusions, AEC Impressions tt recommended
actions Lints of attendees- encl
COFFMAN.F D Atomic Energy Commission, Directorate of Licensing
74/O1/21 4pp
— eOO7OlOloa Formm-ds summary of NRC 750305 meeting u/BE in San Jose to
discuss <3£ fuel Failure eipertence !c preconditioning interim
operating mgt recommendations Discussion outline & Hit of
meeting attendees ecicl U/o ends
COFFMAN.F D- Core Performance Branch 73/03/19 lp
— B007O1O114 Forwards summary of NRC 750417 (nesting uj/BiU in Betheeda.MD
to discuss pellet-cladding mechanical interaction Dlicusilon
outline tt list of meeting encl U/o ends
D Core Performance Branch 75/04/33 lp
B007O10I2& Summary of 750803 meeting u/QE, Comm Edi DNWL, Northern
States Power Co !< Boston Edison Co re preconditioning
interim operating mgit recommendations Known patterns of
reactor operations have caused fuel failures Agenda encl
COFFMAN.F D Core Performance Branch 75/08/15 3pp
0007O1O145 Discusses need for prompt WRC action re pellet-clad
interaction Recommends that end Itr be sent to each
li-censee Lists other factors to be considered U/o end
RDSS.D F Assistant Director for Heactor Safetv 75/OB/23 2pp
300701014? Summary of 760309 meeting u/Uestinghouse fc DNWL In Bethvtdo,
MD re pellet-cladding interaction Meeting agenOa Sr attendees
list encl
SIEGEL, D L Core Performance Branch 76/04/01 7pp
BOQ70I0152 Eipressea thanks for info t, cooperation afforded B Siegel t
F Coffman during recent trip to tabs Pel let-cladding
interaction model discussions d data analysis provided
clearer understanding of Canadian results
ROSS, D F Assistant Director for Reactor Safety 76/04/14 lp
BOO7OI01sa Forwards summary oF NRC 7603IB meeting u/AECL in Ontario,
Canada re pellet-cladding Interaction Intent of meeting uias
tn discuss current Canadian fuel operating recommendations
far CANDU-DHW reactors tt ba<glt for recommendations
C0FFMAN.F B Reactor Safety Branch 76/06/01 7pp
B007010I61 Summary of 760409 meeting ui/BE H BNHL in Bethesda, MD to
review pellet-cladding interaction failures t effects on
reaLtor design J< operation List of attendee* encl
B1E8EL, B 1, Cnre Performance Branch 76/O4/26 Spp
3007010165 Summary of 760421 meeting u/E»on Nuclear Co In QethesdaiMD
to discuss pel 1 e-t-c 1 adding Interactions Exxon Nuclear has
had no fuel failures on bundles being irradiated Meeting
agenda & list of attendees encl
L Core PorPnrmance Branch 76/04/30 4pp
a007OiOliS Summarlies NRC 76O519 meeting u/B&U in Bethesria.HD to
discuss pellet-cladding interactions B&H has experienced
laui primary coolant activity level! indicative of feu
failures Meetlnj agenda (c attendees list encl
BIECEL, 0 L Core Pe/rPormance Branch 76/05/26 4pp
B00701OI73 Summariies NfiC 760-521 meotlnj ia/C-E in Bethesda,MD to
discuss pellet-cladding interaction} Lists data preiented
from ovarpouei ramp tests Meeting agenda t list of
att«n-dees encl
S1EGE(-,B L Core Parfoimance Branch 76/07/09 4pp
-B007010171 Updates evaluation of applicability of FUELOQRAM to LWR
pellet-cladding failures Model will generate failure
probabilities for CANDU data subset uhich mill provide
reasonable fuel bundle to fuel rod Failure correlation
PANKASKIE.P J flattelle Memorial Institute, Pacific Northwest
Laboratory 7B/01/23 lOpp
-8007010194 Forwards examples of correspondence u/US fuel vendors
concerning contributions to AECL- program u/FUELOQRAMB
Description of contract, "LWfl Fuel Pel 1 et-Cladd itlfl
Interaction ti Failure Limits," encl
MEYER, R O Cure Performance Branch FIN fl-1 193 7B/02/14 3pp
-Q00701OI9S Requests Jata presented at 760519 pellet/cladding
interaction meeting betuieen NRC & EfcU, Data needed far
assessment oF applicability of AECL pellet/cladding
interaction model to LUH Fuels
ROSS.D F Assistant Director for Reactor Safety 77/11/30 lp
-8007010304 Confirms telcons identifying addl GE info needed For us* In
joint BNUL/AECL program to assess app 1 Icabi 1 ity oF
FUELOGRAMS to LWRs
HOBS, II F Assistant Director for Reactor Safety 77/03/O1 lp
-800701O207 Forwards agenda For 780302 pellet/cladding interactions
meeting In Richland Requests notification if changes
needed
CHECH.P S Core Performance Branch 7B/02/15 3pp
-BQQ70102IO Recommends Final meeting t< rept re cooperative pellet/
cladding interactions effort u/Canad I ans Rept should be
nonproprietary tt contain descriptions of relevant FUELQGRAM9
E< predictive models
MEYEH, R 0 Core Performance Branch 7B/Q7/1S lp
-B007010219 Requests addl Fuel behavior data re pellet/cladding
interaction Data mill be used For developing improved, fuel
damago limits for licensing of PUR a t> DURs Lists current
needs for program, present status b licensing impact
DENTDM.H R Office of Nuclear Reactor Regulation, Director
79/08/07 7pP
-B00701021Q Speech antitled "Development of Improved LWR Fuel Damage
Limits for Reactor Licensing," presented at ANS 761114
meitlng In Washington. DC
TOKARiM Core Performance Branch 7B/11/14 37pp
-B007010322 Summary of 781312 meeting ui/AECL b BNWL in Ontario. Canada
re draft rept on BNUL/AECL cooperative technical assittancD
program on pellet/cladding interaction FUGLOORAM Lists
meeting objectives Meeting agenda encl
TOKAR.M Core Performance Branch 7S/12/15 3pp
-B007010E27 Notifies of 790503 meeting in Portland, OR tp discuss
utiliiation of data re fuel Failure caused by pellet/
cladding interactions Forwards draft rept for review W/o
encl
TEDESCO.R L Assistant Director for Reactor Safety 79/O3/S7
-8007010330 Provides procedure For transmittal of data requested for
DNUL consultant use in PROFIT pellet/cladding Interaction
model
KNIEL.H Core Performance Branch 79/OS/03 lp
-80O7010333 Comments on "Draft Rept on Joint Program by BNHL b AECL, Mar
1979 " PROFIT data base is strongly biased toward high
failure rate Independent variables are ambiguously defined
QLDBEJJO, T Electric Poiuer Research Institute 79/OS/07 4pp
NONDOCKETED ITEMS
373
— 80070 I OB 3 8 Submits tabulation of estimates of Fuel failiirfl probability
fur control rod withdrawal AT US in PWR Hut standby to 20X.
rated power t full (100X) to overpower (110X) wore
considered in estimates
PANKA3HIE, P J Battelle Memorial Institute' Pacific Northwest
Laboratory 7-7/03/OB Spp
— BQ07O1O241 Requests proposal from BNWL to provide technical assistance
re fuel failure to Div of 9ys Safety Forwards statement of
work Authorization to commence luorlt becomes effective upon
acceptance of eiecuted NRC Form 173
SHRDEDERj F Division af Systems Gafety 79/09/07 7pp
— B0070 10244 "Pellet/Cladding Analysis of Turbine Trip W/o Bypass, " final
rept.Jan 197?. prepared for BNWL
POMEROV, D L , 9AUAR.T a . MARINO. J P Scanpouor. Inc 79/O1/31
B3pp
— 8007010249 Requests proposals from INEL to provide technical assistance
re fuel performance to Div of Bys Safety Forward a
statement of work Author 1 tation to commence work becomes
effective URDU NRC Form 173 accepted
BCHROEDER.F Division of BUHt&ma Safettj FIN A-A263 79/OB/B4
6pp
— 8007030O3B Provides response tu CQ1A Request BD-37B for list of nuclear
Uflsto depot! arnirnd US, locations (< cost Request IB
interpreted t» reference commercial high ti low 1 ttve 1 & U
mill tai I ings
GRAUN.J LiconGtnQ Procuss !< Integration Branch BO/OA/13 fapp
B007030064 Henponds to TUIA request fni summaries of all radiation
exposure data b NRC. or ACRS position papers leading to NRC
adoption of 0 1 as mai radiation permissible Forwards
documents listed in App A No position paper* eiist W/o and
FCLTON.J M Division of Rules and Records E10/0&/SS 3pp
8Q0703O066 FDIA request for summaries of all radiation exposure data (t
NRC or ACRB position papers leading to NRC adoption of 0 1
as mai radiation permissible dose
ICE, RD Oklahoma. Univ af BO/03/H7 Spp
8007030331 Responds to TD1A request Tor NRC telephone dlrectnnj
Forwards directory W/o encl
F£LTDN,J H Division af Rules and Records 80/06/26 3pp
BOO 703 03 32 FOIA request for NUC telephone directory
GONCALVE8.A National employee Benefit Associates Bd/06/iJO lp
B007010079 FDIA request far 37 documents referenced in M Takar memo to
ACR8 re pellet-cladding interactian
KIQQINS, S R HestinghouBB Electric Corp BO/OS/Oi 7pp
0007030122 Responds to FOIA request For documents re US radiation
monitoring or related activities of French nuclear uoapons
lifting since 1966 Documents are being referred to CIA for
disclosure <fe termination & direct response
FELTON, J M Division of Rules and Records 80/06/29 lp
8007020127 FOIA request For documents re US radiation monitoring or
related activities of French nuclear weapons testing since
194i by Wheeling T AQM US Instruments ship or other vessel
TREAKLEi K Greenpeace Foundation 50/05/39 lp
B00708Q13B Responds to FOIA request for all memos.ltrs ti records
concerning organl i»tlon, Peopl e Generating Energy NI1C has no
files indexed or maintained under organiiation Other
relevant info may be available In LPDRs
FELTON, J H Division of Rules and Records 00/06/23 lp
B007Q30136 FOIA request for all memoBi Itrs tt records concerning
organiiattom People Generating Energy Affidavit encl
BEL1N.A Center for Lau In the Public Interest SO/Oib/11 Spp
B0070a02Qt Addl response to FOIA request far info re award of contract
NRC-10-77-140 Issued to Damans tt Associates Forwards
documents listed in encl Info partially tt completely
withheld NRC advice b opinions (r*f FDIA Exemption 3)
FELTDN.J M Division of Rules and Records 60/02/12 3pp
— B0070202B7 Proposal evaluation rep t, Solicitation RB-77-38. "Audit of
Bupergrade Positions," Info partially withheld NRC advice d
opinions (r*f FOIA Exemption 3)
JQNEH.C C Commisaion MATTIA.M J Administrative Contracts
Branch 77/06/33 6pp
— 8007030292 Final proposal evaluation rept d recommendat lon> Bolic itatlon
RS-77-3S. "Audit of Bopergrade Positions " Info partially
withheld NRC advice b opinions (ref FDIA Exemption 3)
JONES, C C Commission MATT I A, M J Administrative Contracts
Branch 77/04/23 14pp
B 0070304 60 Responds to FOIA request for Info re dates for scheduled tt
unscheduled outages for plants located In continental US tt
info related to maint operations being performed on plants
Forwards NUREO-0030, Vol 4 W/o end
FELTON.J M Division of Rules and Records BO/06/S3 lp
80070B0036 6ECV-75-429
Discusses procedure by which NRC can determine whether
matters of alleged or suspected criminal violations of law
should be referred to DOJ Recommends that Inspector tt
Auditor Dfc accept full responsibility
BHAPAR.H K Office of the Executive Logal Director 73/OB/ll 3pp
B007Q90377 FOIA request for winning proposal in response to HFP R8-NHR-
80-103. "Energetic Thermal Interne tions, Rocritical ity («
HTQH Accident b Transient Coolant Flow "
RAUNER.L H Advanced Technology, Inc BO/O3/H9 tp
80070903BO Response to RFP RB-NRR-tlO -IOS, "Energetic Thermal
InterflctionB.necrl t icall ty !i HTOR Accident •!* Transient
Coolant Flow " Describes proposed technical approach,
research plans, schedules tt milestones
THCOFANUSjT 0 Purdue Unlv RS-NR-BO-102 79/IH/1S 31pp
B007I 00000 Addl response to TOIA request for incumcnta re licensing of
facility ic transcripts of closed Commission meetings App A
documents available in PDR Document 1 of App 0 t< parti arts
of Documents S-21 withheld (ref rOIA Exemptions 3,4 !. 9>
FELTDN.J M Divieion of [iulen and Records BO/Oo/a? Spp
— 8007100013 DiscuBsBs application of inventory difParencB rflgrossion
equation to Aug inventory Info withheld procedures for
safeguarding nuclear motl It NRC predec I si onal advlcaj
oplnionu (< rorommendfltions (ref T01A Exemptions 4 t 5>
MCBSINOEH.M Material Control tt Accountability Development Dranch
79/09/26 3pp
— 8007100020 Summary of 000102-03 meeting between utll d NRC in Bilver
Bpring.MD re MCA license conditions applicable Par resumed
highly enriched U operation! Info partially withhold
(ruf FDIA Exemptions 4 b 9) Charts encl
JOY, D Material Control Licensing Dranch flO/Qt/10 lp
— B007100023 Forward* mat! balances covorinp Inventory far 790B14-1004
Info withheld safeguards t, security measures (roP FOIA
Exemptions 3 b 4)
HEHSLEV, K D Nuclear fuel StrvlcoB. Inc (subs of Dotty Oil Co )
NfE 79-13B3 79/13/05 5pp
— B007I0002B Toruiard* dolailod rept on current (t planned projacls
designed to improve facility accountabll i ty iys E< nsNDtiated
Inventory difference results Rept withheld (ref FOIA
EZiemptlonu 3 It 4)
TAYLOR. C M Nuclear Fuel Services. Inc Caubs of Ovtty Oil Co )
NFE 79-081 79/10/H3 lp
5007030463 FOIA request for Infa re datts for scheduled tt unschedulad
outages for plants located In continental US h info related
to maint operations being performed on plants
BKORDHOD. P H Briggti Engineering ti Testing 80/06/04 lp
0007030007 FOIA request for documents re transportation of spent fuel
from Portsmouth, VA to Savannah River plant in AifteniSC
MEYER.K A Affiliation UnHnoum BO/06/03 Spp
8007030033 Addl response to FDIA request for document* listing nuclear
plant locations, accidents occurring at each location, environ
impact results, radiation leaks, (< nuclear watte depots
around US, Forwards 0 Braun BOOMS memo
FELTON, J M. Division of Rules and Records 00/06/83 lp
-8007100032 D!»cil»»»» 8ECV-79-650A, "NFiC Regulation of Highly Eni-lcMd
U Operations at Facility " Lists nddl requlremnntn needed it
position taken vy JF Ah earn* in Q DO 109 mo-mo It udopted InPo
partially withheld (ref TOIA EiBmptlon 3)
HANRAHAN. E J Material Control Licensing Dranch 00/01/11 2pp
-BQ07I0003B Summary of CammUniiin nOOHA meotinn re SECY~79~6nO t. 8ECV-
77-bSOA conciirnlng facility Scope t< qualttu of matl control
ti accounting elements would be improved Bummarlzns proposed
actions Info partially withheld (ref FDIA Exemption 3),
HtANRAhlAN.E J Material Control licensing Dranch 00/01/13 Bpp
374
NONDOCKETED ITEMS
— BO071OQ044 Di5tu&6ea 79lQOfl Inventory difference of high enriched U
exceeding limit of error constraint Fnruards rept Detailing
causes tontriDuting to inventory differences & corrective
actions tafcc-n Rept uithheld Iref POIA Eiemption 31
TAYLOR, C W Nuclear Fuel Services, Inc Uubt of Getty Oil Co )
NFC-77-083 79/1 1 /03 2pp
— BO07IOQ053 Forwards comments on JQ PjirtlDu 790325 itr to KD HenBlay
Infn withheld safeguards t, security measures iref P01A
Eiumpllon 31
HENBLCV, rt D Nuclear Fuel Services. Inc dubs of Getty Oil Co 1
79/D7/C". 3pp
~eo0710(1057 Submits list qf recent mods at facility which upgraded matl
accountability !< control program Info withheld procedures
for safeguarding lirenaed SNM (ref FOIA Eiemption 4)
JQV.DR Material Control Licensing Branch 79/Q"?/ll Hop
— B0071C0069 Forwards info status rapt re 79091.) inventory differences of
Mo,hlij unriched U eiceeulng limit of error constraint Info
withheld procedures fpr safeguarding nuclear matl (ref FOIA
Exemption 4)
HENSLEV. K D Nuilear Fuel Services, Inc (subs of Getty Oil Co )
79/10/02 3pp
— -E30071COQ72 Summary of 790916 meeting between util & NRC In Bathe-si!*. HD
re concerns of highly Bni-ichPlJ U invsntory difference
behavior Inventory difference is licensee problem Info
partially uithheld (ref FQ1A Exemption 3)
JOY. D Malarial Control Licensing Branch 79/00/21 Bnp
--HOQ7100QBI Summary of 79001ft mooting u/util Lists major util concerns
Including Improving of accounting »yt Majority of meeting
spent on repotting status of NRC questions Info partially
uiithtield (ref FtllA Exemption 9}
PAHTLDW, J 0 Material Control Licensing Branch 79/OB/I7 3pp
0007100337 Notifies that JF Ahearne concurs In wording of fire
protection ru 1 a, SeCY-80-Oaa. <is revised by J Parry 800317
nemo sub j to listed changes
BAUTER.Q Commission 00/04/16 1 p.
— BQ071CQ334 Forwards draft memo iummarliing individual Coromi »s i oner
comments on SPCY-BO-OBO, f ire protection action! Requests
comments or concurrence kn time to affirm paper on 000319
Draft memo, mngif led pag en & draft FR notice end
F'ARRY.S J 8 Office of the Secretary of tht Commission BO/03/17
B0071100Q4 Responds to FQIA request for 11 documents concerning
facility Items- S, 3 !i 5-IQ have been addressed In earllsr NRC
re-sponsei Attachment D of Document II uithheld (ref FOIA
Eiemption 4 fc lOCFna 710)
FELTDN.J M Division of Rules and Records GO/06/27 Son
QOO711OI49 desponds ta FDIA request for 1979 quarterly r«pt» for 3M Co
Po-310 static elimination devices InFo withheld (ref FQIA
Ei amp t ion 4)
FELTON.J M Division of Rules and Records 80/07/0? Ip
BOO7110159 FQIA request for 1977 quarterly repti for 3M Co Po-SlO
static elimination devices
MILEHAM.J Mark IV Industries. NRD Div BO/06/20 Ip
800>711024a AdvliB! that RT Kennedy concurs in changes to SECY-BO-OBB.
fire protection rul e, propased In 0 9outer 000416 m«mo,subj
to attached revlslDns
QUILBERT, J CDmmlssion BO/04/17 Ipp
— 3007110246 Notifies that JM HendrlB concurs W/B00416 VBT*IOH of fire
protection rule circulated bij 0 Bauter as modifieil bi| BT
Kennedy
FOKTECILLA, H Commissioti 80/04/10 Ip
800711O5BA Forwards info requested by JF Ahearne re atatus of firs
protection ravieui program, al ternate/ded i cated shutdoun lys
status as of EJ00331 t> other outstanding Isauss
LfilMAS.G Asaiatant Director for Safety Assessment BO/OH/QS 7pp
B007140212 Responds to FQIA request for page from WASH -7 40 update
65Q4J3i consisting of DN Sunderman memo to 8Z Biauleuicii
Document 13b F-'orwar-d 5 nemo
FELTON.J M Division of Rules and Records 80/Oi/Bt Ip
—0007140320 Discusses revision to UASH-71O Comparison of ground rulci In
two ana ly aes t effects is instructive in pointing out real
differences Forwards table consisting of comparison of
selected input & output items in HASH-740 & revision
SUNDERMAN, D N Battnlle Memorial Initituts, Columbui Laboratories
(.3/04/13 3pp
8007MO214 FOIA request for page from WASH-74Q update, &30413, canil itlni
of DN Sunderfnan memo tn B2 Biaulauici, Documnnt 136
Island Ctuseup Neus Birvlce BO/06/ 10 Ip
B00714O22(b Responds to FOIA request for document* re H Qelltle Formed >
documents listed in App A U/o one Is
FELTQH.J M nivlsion cf Rules and Records BO/07/01 2pp
0007U032B FOIA request for documents re M Belisle M Deli*l* affidavit
encl
HELIW.A Center for Lau In the Public Interett 50/06/11 3pp
0007140339 Responds to FdlA requait for records re fiv* categories of
Info concerning prapoa»d fire protection rule All documents
relative to request are available in Hash ington. DC PDF!
FELTON.J H Division af Rules and Records 80/06/27 Zpp
0007140243 FQIA request for records re five categoric* of Info
concerning proposed fire protection rule
MCGAflHY. J H Debwaisa b Llberman 80/06/16 Epp
9007140343 Responds to FQIA request for Contract NRO~-OB-BO-33Q, "Btudy
of US Nuclear Health & Safety Info Dlssemlnationi " awarded
to Franklin Inst Contract Is available in Washington) DC PDR
FELTON,J M Division of Kales and flecordi 00/07/OB Ip
8007140248 FOIA rBi(UBst for Contract NRC-08-80~338i "Study of US
Nuclear Health tt Safety Info DisoemlnatlDn. " auardid to
Fratifclin Inst
NOCELLA.S J Advance* Technology. Inc 00/07/O1 Ip
8007140377 Responds to FDIA request For all Info uihich directed or
discussed any changes of proposed Fire protection rule in
BECV-BO-OBB App documents have been faruiarded J Ouibert
B003I1 memo ulthhald (ref FOIA exemption 9)
FELTDN.J H Division of Rules and Records 80/O6/2i Sap,
— B007I40271 Staff requirement memo re 000423 open Affirmation Session
80-18 In Uashingtunr DC, Includes overall records of
Commission votes re BECV 0Q-166igECY 00-177 S. 8ECY-BO~08a
CHILK.8 J Office of the Secretary of the Commlsiion. 80/03/01
13pp
"0007140277 DUcuiiEi fire protection rule proposed in 8ECY-80-08B, Lists
JF Ahearne recommendations re provisions which should be
incorporated in rule Includes Info re public comment
period tt implementation of nonshutdoun iys mods,
BAUTER. D Commission 80/04/10 Ip
—8007140302 Discusses fire protection rule proposed In 8ECY-BO-OBB
ConunltBlan affirmed, u/commentsi proposed fire protection rule
delineating certain ruin fire protection requirement* at
300433 Affirmation Session 0O-1B, Lists recommended changes
NDTLEV.D P Engineering Metholology Standard* Branch BO/06/03
2pp
B007UO496 Rsnuests Commission approval to publishi for comment, amend to
10CFRSO In form of App fiiiu/flre protection requirement! for
plant* in operation prior to 790101 Amend uould facilitate
Implementing BTP f S-l
FQNTEC1LLA.H M Commission 80/03/14 2p«
B007140EB6 FOIA request for all info which directed or discussed any
changes to proposed fire protection rule In 5ECY-BO-OBB It
record of Commission's vote re changes
KNUTH.D F Kerr- PIcQes Chemical Corp (suits of Kerr-McOee Corp 1.
60/03/30 Id
B00711O304 Discusses status of App R to 10CFRBO re impact of requiring
all Fire protection features installed by 801101 Eleven
plants will not complete Section 3 i mods h Section 3 3
open items bij 01)1101
LAINAB.O Plant Sijstems nrancli flO/04/11 3pp
B00714O471 Responds to FOIA request for rept on potential threat to
nuclear activities from insidersi DDE study on ef factivenes*
of itcurity clearances h supporting document i used *t B00619
brl«flng re repts Oocyments avAilabli at PDF). DDE S, CIA
FELTON.J Division of Rules and Record* 80/07/10 tp,
BDD711O347 Duocrilmi status nf al Inmate/dedicated shutdoun *u» as of
0003 SB
CASE, E Offlte of Nuclear Reactor Regulation. Director BO/O7/10
Hpp
— 8007140S04 Sunshine FR Notice of Commission meetings during wk of
B006I6
HAOEE.M Office- of the Secretary of the CommiBtion SO/06/ 14,
NONDOCKETED ITEMS
375
B00714Q498 FOIA request for rept nn potential threat to nuclear
•ctivities from Insiders- DOE study on effectiveness Qf
security clearances & supporting documents used at BQ0619
briefing re repts
COCHfiAN. T D Natural Resources Defense Council BO/ 06/24 lp
— BQO7170314 IE Insp Rept Vj-Ol of RAD Svcm.lnt on 791212 Noncomp ] lance
noted failure to keep "ecords of receip t, transfer, stopase.
survey b monitoring of malls
CAMPBELL. H , MCCLINTOCK, R O Region 1, Philadelphia, Office of the
Director 90/01/02 I2pp
0007140445 Responds to FQIA request for winning technical proposal in
response to RFP n6-NMB-BO-024, "Development of Advanced Matl
Accounting Sys Simulation (AMASS) Model " Forwards proposal
FELTDN.J H Division of Rules and Records DO/07/0? lp
— B00714063i Response to RFP RB-NMg-BQ-024, "Dove lopment of Advanced ^
Accounting Sy s Simulation (AMASS) Model " Objective is mod
of MCLAMS simulation model far broad application to wide
variety of licensee facilities
» NUBAC, Inc HB-NH6-BO-024 SO/OI/O4 7Qpp
80O714065O FQIA request for winning technical proposal in response to
RFP HS-NMS-BO-024, "Development of Advanced Matl Accounting
Sys Simulation (AMASS) Model "
TREVINO. T Science Applications, Inc TT-86Q BD/06/27 lp
— B00717031B IE Iiisp Findings !. Licensee Ac k dtd 690916 of License
37-13129-01 Insp findings nu noncompl iance noted
STEARN5.C F Atomic Energy Commission 69/09/16 9pp
— B007 170326 Ack receipt nf 751103 1 tr informing NRC of steps taken to
correct violation noted in IE insp on 731009 Actions mill be
eiamlned during subsequent insp of licensed program
NELSON. P R Atomic Energy Commission, Directorate of Regulatory
Operations 75/11/12 lp
— BOO717Q33B Informs NBC of steps taken to correct violation noted In IE
insp on 751009 Corrective action complete Inventory of Co-fcO
has been taken t< new procedure is under preparation to avoid
future problems
LINNEMAN.R E Radiation Management Corp 73/11/05 lp
B00714O664 Responds to FQIA request for 5 documents re state U mill
incidents Forwards documents
PEL TON, J M Division of Rules and Records SO/07/07 lp
B00714O674 FOIA request for 5 documents re state U mill incidents
BUHKS.N fllac* Hills Alliance 80/06/16 3pp
B00713O743 Responds to appeal re denial of FOIA request fnr records re
Abalone Alliance >< info concerning FBI Director 770B04 memo
to Deputy Atty General NRC has no further documents subj to
request
DIRCKBiW J Office of the Eiecutive Director for Operations
ao/07/io ip
8007150749 Appeals denial of FOIA request for all records re Abalone
Alliance fc info concerning FBI Director 770904 memo to
Deputy Atty General FDI 770B04 memo end
VAHON, C Affiliation Unknown 80/06/03 7pp
8007150796 Responds to FQIA request for records re Abalone Alliance &
info concerning FBI director 770904 memo to Deputy Atty
Oeniral Forwards document re Alialone Alliance Other
documents may be available in CA PDRs W/a ends
FELT ON . J H Division of Rules anil Records BO/03/03 lp
80071307Bi Submits addl response to FOIA request Fur five categories of
Info concerning proposed Fire protection rule Document)
listed in app are available In Washington, DC PDR Five
documents re request are still under review
FELTON.J M Division of Rules and Records 00/07/09 3pp
B007170197 Responds to FOIA request for Region 2 list used for
distributing bul 1 et ins. info notices h circulars & Region 4
list for distributing quarterly publication re contractor/
vendor insp info Forwards lists H/o ends
FELTON.J H Division of Rules and Records 00/07/14 lp
8007170202 FOIA request for Region Z list for distributing bullutins,
info notices t circulars !< Region 4 list for distributing
quarterly publication re contractor/vendor insn info
KEENAN.T Inside DOE, McOrau-Hi 1 1 Publication 80/06/13 lp
B007170292 Discusses IE Insp Rept 30-13217/78-01 of License
19-17039-01 on 7B0425 No noncompliance noted Major ureas
Inspected procedures & representative records, personnel
interviews t, observations by inspector
MCCLINTOCK. R 0 Region 1< Philadelphia, Fuel Facility I. Materials
Safety Branch 78/05/1B 2pp
--BQ07170298 IE Inap Ropt 30-13219/7B-O1 of License 19-17039-01 on
780423 No noncomp 1 lance noted Major areas inspected
procedures & representati VE recordsi personnel interviews b
observations by inspector
* Region 1, Philadelphia, Office of the Director 79/09/10 3pp
— B007170304 IE Insp Rept 79-01 of License 19-17039-01 on 790111 No
noncompliance noted Major areas Inspected procedures tt
representative records, personnel interviews !i observations
by inspector
MCCLINTQCK.R O Region I, Philadelphia, Office of tha Director
79/O1/11 4pp
— B007170306 IE Insp Kept 7B-01 conducted on 7B10H No noncompl iance
noted Major areas inspected procedues t, representative
records, personnel interviews tt observations by Inspector
CAMPDELL.M , MCCLINTOCK.fi 0 Region 1. Philadelphia, Office of the
Director 78/10/17 13pp
— 8007170379 Discusses IE Insp Repts 30-0&309/79-01 (. 30-14546/7'J-OI oF
Licenses 37-13129-01 t. 37-13129-03 on 790201 tt forwards
notice of violation
MCCLINTQCK.Ft O Region 1. Philadelphia. Office of the Director
77/02/12 3pp
— BD07170102 Notice of violation from insp on 790201 Noncomplianee noted
failure to instruct all individuals working in restricted
area of precautions & procedures to minimiie exposure to
radiation & radioactive matls
* Region 1, Philadelphia, Office of the Director 79/02/12 Spp
— B0071704II Ack receipt of 790305 Ur informing NRC of steps taken to
correct violations noted in IE insp of Licenses 37-13129-01
It 37-13129-02 on 790201
MCCLINTQCK.Fi o Region 1, Philadelphia' Fuel Facility I, Materials
Safety Branch 79/O3/23 Ip
— 8007170416 Responds to NRC 790301 Itr re violations noted in IE insp of
Licenses 37-13139-O1 (, 37-13129-03 on 790201 Corrective
actions addl instructions given new employees It surveys made
d records maintained
KIM.S H Radiation Management Corp 79/03/05 4pp
— B00717043S IE Insp Kept 79-01 on 790201 Noncomplianee noted failure to
instruct all individuals working in restricted area of
precautions !, procedures to minimiie exposure to radiation t>
radioactive mails
MCCLINTOCK, R O Region 1. Philadelphia, Office of the Director
79/02/09 9pp
— 8D0717043B IE Insp Rept 80-01 on 800228 Noncompl iance noted no records
found showing receipt of samples from customers
CQSTELI.O.F , CAMPDELL.M Region 1, Philadelphia, Office of the
Director BO/03/19 llpp
B0072S02O7 Addl response to FOIA request for documents re proposed
nuclear reactors located near Gyaema, Korea Forward 3 JR Shea
draft memo to commissioners SErV-80-239 it located in DC
PDR Info partially withheld (ref POIA Eiemption 3)
FELTON.J M Division of Rules and Records SO/07/ 1 3 2pp
— B007220214 Draft Commission paper re licensee for GE to eiport two
rnactors, KNU 7 d 8 to Korea Reactors uiould he located on
Oyaeme Forwards final Eiecutive Branch views Info partially
withheld (ret FQIA Eiemption S)
SHEA.J R Office of International Programs, Director BO/07/13
8007520243 Addl response to FOIA request For Info concerning Facility
Noneiempt portions of documents listed in app are located In
DC PDR Documents 1.2 & 3 partially withheld (rcf FdlA
Eiemptlons 4 !< 3) Documents S !< 6 are undergoing review
FELTDN.J M Division of Rules and Records BO/07/16 3p|>
--BQ0722QS31 Discusses 800227-39 site visit to further evaluate
effectiveness of neu process monitoring license conditions
Info partially withheld (ref FOIA Eieraptions 4 fc 5)
Responses to M Udall questions dtd 900306 end
JOV,DR Material Control Licensing Branch 60/03/11 4pp
8007220326 FOIA request for "Submerged Domineral i icr Bgn Technical
Evaluation Rept "
MONTAGUE, P National Campaign for Radioactive Waste Safety,
60/06/33 lp
376
NONDOCKETED ITEMS
B007230224 Responds to FOIA request for H Denton B00613 memo to
Commissioners entitled. "Compliance of DL Applications W/
Current NHC Rogu latl ona. Reg Guides & Branch Technical
Positions " Forwards mump
FELTDN. J H Division of Rules and Records BO/07/16 Ip
— 8007230831 Requests estimate of NRC * licensee resources involved in
Implumentlng proposed requirements of end draft memo re
neui DLs compliance ui/current NRG rules, reg guides 1 branch
technical positions Response oipected by 800933
CHILIS. 8 J Office af the Secretary of the Commission
COMPD-QO-V3 BO/OS/ 12 2pp
BOQ7230229 FO!A request foi H Denlon 800613 memo to Coromi ssioners
ontitlod, "Compliance of 03, Applications W/Current NRC
Regulations, Reg Guides !, Branch Technical Positions "
HEIBS.E R Sheldon. Harmon t< Weiss BO/07/11 Ip
0007230250 Addl response to FOIA request for all info re changes to
proposed dm protection rule in SECV-BO-OBB Jc record of
Coinmi > sion' » vote Commissioner Bradford concurrence end.
31. dc-cumontB withheld (ref FOIA Eicmptinn 3}
FELTON. J M Division of Rules and Records BO/07/16 Bpp
— 3007230236 Notifies thnt Commissioner Bradford concurs iii/revisions in
B00416 memo ro fire protection rule (BGCY-BO-aBB) Eicerpt
ot rule end
THOMPSON. H L Commission BO/04/21 3pp
BQQ7230635 Requests comments on enc 1 memo describing results of
corrosion tests for commercial grade mild steel partially
embedded in DDW vinyl estor-stijrena waste Form containing
NS-1 dttcontamlnation uaste concentrate
NE1LEOH, R M DrODhhaven National Laboratory 79/12/04 7pp
6007240133 AdJl response to FOIA request For Five categories of info re
proposed fire protection rule Consultant rept, CT-1254 tt
A.CR9 member ropt ara available in PDR Forwards Fi Ferguson
791026 mamo ti Ort Arlotto BOQ516 memo
F ELTON, J M Division Df Rtilos and Records BO/07/1B Ip
— QOD73flOlBQ Forwards brief description op evaluation program & guideline
documents For proposed fire protection rule Draft proposed
rule oncl
FERGUSON, R Plnnt Systems Branch (Pre 791030) 79/10/H6 49pp
0007230043 FOIA request For R Burnett speech delivered at Inst of
Nuclear Matls Mgt annual meeting
WEISS. E R Sheldon. Harmon & Mela* 8Q/O7/OB Ip
8Q07S30069 Responds to FOIA request For info re availability of NRC
meeting records Provides list oF available NRC meetinn
recardc All documents are available in PDR
FELTON. J M Division af Rules and Records BO/07/22 2pp
B00735Q072 FQIA request for info re availability oF NRC meeting
record*
ETHERED8E.L California. Univ of, BerVelfliJ BO/04./80 Ip
B00725OOB3 Afldl response to FOIA request for all documents involved in
preparation of NUREQ-0439 It upgraded physical protection
regulations in 10CFR73 Provides list of SB unclassified
NRC documents & 236 unclassified open source document!
FELTONiJ H Division of Rules and Records BO/07/li Bpp
80072BQ197 Addl response to FOIA request for certain proposals
submitted under RFP-R6-NHS-024 Forwards nonproprl etary
versions oF proposals submitted by NUBACi Inc. BNHLj LOB Alamos
Technical Associates, Inc & Science Applications Inc
FELTOH.J M Division of Rules and Records BO/07/31 Ip
— 8007530202 Nonpropr ietary response to fiFP-RS-NMB-024, "DevBlopment of
Advanced Mat) Accounting Sijs Simulation Model " Proposal
develops simulation mode-1 for evaluating current accounting
practices t to study data analysis
* Battalia Memorial Institute, Pacific Narthumtt Laboratory
RS-NMB-BO-024 79/12/2B 27pp
— 9007280309 Nonpropri etarn response to RFP-RS-NMS-024. "Dovslopment
of Advanced Hatl Accounting Sys Simulation Model " Deacribes
to-clinical approach, related eiperience Si capabilities,
organiiation d mgt ti personnel
* Los Alamos Technical Associates, Inc R9-NMB-BQ-034 HO/01/04
— B0072B0213 Nonpropr ietnru, revised response to HFP-HS-NMS-024,
"DevBlopment oF Advanced Matl Accounting Syi Simulation
Model " Develops computer program for use in analysis of
mat! balance period Inventory results,
» Science Applications, Inc HS-NM3-BQ-024 BO/04/ li 19pp
B00724O193 Addl response to FOIA request For three categories of
documents re Union Carbide U mill Facility in Oas Hills, HV
Foriiiardi document! listed in App A M/o encls
FELTON, J M Division of Rules and Records BO/07/17 3pp
SQQ72B0267 Responds to FOIA request for Itr identifying individual uiho
informed Region 3 of possible radioactive matl dapoeited in
disposal dump in Kewburgh Heights, OK NRC was informed bu,
telcon No documents are available
FELTON, J ht Division of Rules and Records 80/07/22 Ip
8007240431 Responds to TDIA request for records developed in course of
NR(i investlgat! D«IS oP IS corporations & seven Individuals
NRC has no documents subj tn request
FELTON, J M Division of Rules and Records 80/07/17 Ip
B0072BO270 FOIA request for Hr identifying individual who informed
Region 3 nf possible radioactive matl deposited In disposal
dump in Neuburflh HeightH.OH
ZELLNER.R J McQean Chemical Co , Inc BO/07/03 ip
8007240437 FOIA request for records developed in course of NRC
1 nvosti gatinna of 12 corporations & seven individuals,
BWMER, J C StroDclr, Stroocli t, Lavan 30/07/03 Ip
S00724043-3 BssponiJs tu FOIA roqueit Far Any atldl insp documents re US
Radium Corp Ha further documents are available
FELTON, J M Division of Rules and Records BO/07/22 Ip
B0072B027S Responds to FOIA request for NRC contracts auardtd for FVBO
Forwards list of contract* executed in FV7B, FY79 t, FYBO All
contracts are available In PDR
FELT OH, J M Division Qf Rules and Records 90/07/16 Ip
— 0007330279 Lists All contracts executed in FY7B. 79 !< BO
FELTON, J M Division of Rules and Records BO/0&/19 24pp
8007340463 FDIA request For anij adtll insp documents re US Radium Corp
HeOARTV.W 5elF-Pt>iuered Lighting. Ltd BO/07/01 Ip
BOQ72B0374 FOIA request for NRC contract* awarded far FYBO,
VERRECCHIA.P Critical Mass Energy Project 80/07/07 Ip
00072401179 Ltr tu all applicants Par CPs & OL> requesting info re
evacuation time estimates around proposed nuclear plant*
Requested info should be submitted by aOOBOt
EIBENHUT, D G Division of Licensing BO/07/02 Ip
0007200002 Responds to TOIA rcquBsl for R Burnett speech dnlivareit at
Inst of Nuclear Matla Mgt annual meeting Forwards three
speeches presented by R Burnett at annual meeting
FELTONj .' M Division of Rules and Records 30/07 /SB Ip
8007230283 Responds to FOIA request for records re Scott Luminous, Inc
Forwards documents listed in App A Deletions of info
pertaining to other companies have been mad* in Documents
1,2, 10 l> IB M/o ends
FELTQN.J M Division of Rules and Records 80/07/17 3pp
000726^985 FBIA request tor records re Scott Luminous. Inc
TAVLOIf, J 8 Affiliation Unknown ao/06/25 2pp
-B0072BOOSS "Phyaicfll Protection Rules ft Requirements - What Drives
Them "
EftlCKSONjR A . BURNETT, FI Physical Security Development Branch
00/07/22 3pp
-SOO7a300'3B "Nnc Response to Significant Inventory Differences "
GURNETT.fl Physical Secui-iti) Development Branch BO/07/22 6pp
B0072&0290 Responds to FOIA request for Commiii Jonur Oilinshy 1979
telephone logs b related documents Requested info is
available in PDR
FELTON, J M Division of Rules and Records BO/07/17 Ip
8007300294 FDIA request for- all Commissioner Oillnshy telephone logs,
calendars t< memos
IRVINEiR J Accuracy in Media BO/07/10 Ip,
-B0072SO-061 "Future Dutloot For Ug Nuclear Safeguards "
DtRCKS-W J Office of Nuclear Material Safety t, Butt-guards
Bpp
NONDOCKETED ITEMS
377
HO07300QB2 Addl response to FOIA request for inatl vet elved. cnnstd ertd
nr approved by Commission during considers! i on oP facility
Inventory Info partially withheld security measures &
restricted data (ref FOIA Exemption* 3 t< 1 1
FELTON. J M Division of Rules and Records HO/G7/16 3p
CunfirmB BO 032 I tuUmn notifying NRC ttiat Pec-ase Cash 4
tantalus one irradiated fuel element & mill arrwe in
PnrtBmouth, VA InFo pavtinllij withheld date of arrivaHref
FOIA Eiern$ felon 4 > NJ*C foe det^rnination encl
STDNEUURNER, U Transmit I eur . Inc 144B& 30/05/21 2pp
BQO731Q232 Responds to FOIA request For docunents re eipnrt qf SNM (.
replacement parts to India Forwards documents listed in APP
A Documents "111 be placed in PDR
FELTON.J M Division of Rules and Records BO/O7/24 3pp
— B00731O247 Updates BOO403 analysis of fuel requirements For Tarapur I
fc II Analysis is based on more detailed & current info
Provides discussion, cone lusions. rBfuelinf schedule t>
prajectHd operating schedule For reactor 8B Bed! Itr *nc 1
PEDEHBEN.K Office of Policy Evaluations 79/O1/16 9pp
— 800731050:) Requests eitension until U00530 re route approval Tuo
Model SD/23 are eapocted to .irnv<> t> no alternative southern
ports are aval lahle to spent Fuel thijiments u/svc From
Sue [I en Info p.irtiallij uithhria (rtF FOIA Exemption 4)
U Cdlniu I ntei nat \ imal Co BO/O2/2S lp
POO731&506 CnnfirmG 00042] not i f icot i cm of spent fuel shipment From
Sweden arriving in Portsmouth , VA Info partially withheld
dates Ei times (ro* FOIA Eiamptlon <ll
ftAVENSCnOFT.N Ed 1 oia I n tornatj nna I Co AD 34 E BQ/04/21 3pp
8007310330 Provides supplementary info re Tarapur reactor fuel
rei(uirementBi in response to Commissioner rthearne question re
basis For fuel fabrication time DOS provided 9-month
fabrication period Inadequate data available for analysis
PEDEREEN.K Office of Policy Evaluations 79/01/lfl Hpp
g0073l03iO Lista questions re review of License XSNM-1379 concerning
proposeil eiport of low enriched fuel to India Requ«st9
EiEcutive Branch response
SHEA.J R OfFiCH of International Programs. Director 77/05/35
aOO73tO4Q3 Responds to FOIA request for proposal RH-NRR-80-1 11.
"Chardc Lor i i at t on uf Nuclear Power Plant Protective Coating
Sy s Under DBA Condition-; " Forward* proposal
FELTON.J M Dlvlaion of Rules and Itecords 00X07/24 lp
— 0007310412 Solititatlon fc.r fi3-NRft-BO-l 1 1, "Charac teriia t ton of Nuclear
Pouifr Plant Protective Coating Sy s Under DDA Crniditiona "
ProjiBnal* should be aubmittoJ to fJftCi Dlv of Contracts
DDUOHERTY, D J Technical AsfitatoncE Contracts J^^anc^
riB-NltR-aO-l 1 1 DO/01 / 1 B 94pp
BQ07310266 Foriuards updated analysis of estimated Puel requlrDm^nts fo
Tarapur reactors, reflecting Fuel covered by application
XSNM-1379 U/o enc 1
DEV1NE-J Office ot Policy Evaluations 7<7/OA/O7 lp
B007310270 Application by OE for license to eiporl sii travoning
incore probo detector assembliBB to India
D General Electric Ca DDW-791Ba 79/05/07 lp
S007310237 FOIA request For documents re export of SNM fr rep latement
parti to India
N Center for Uaui Si Social Policy BO/O6/3O 4pp
B0073102SB Responds la appeal ro FOIA request for lint flP
• nvironmentallt) qualified oquipme-nt Foruarda nonpropriatary
portioni of Franklin Research Ctr rept t> tamp late Uyln Labi
rept tt NUREfi-0370 HUREO-0390 not encl
DIRCK8.M J Office of the Executive Director For Qperatinns
lp
QOO731O4BO FOIA reqUHst for propoeal RS-NHR-BO-I 1 1 . "Charac tor i l ation
of Nuclear Power Plant Pi-otvctive Caatilkg Bye under DOA
Condi lions "
PUSCHCUr M A Consumers Pouitr Co PUSC 2S-BO 90/07/07 lp
BOO731O5« Addl responso to FOIA. request For 57 documents referenced In
M Tokar nemo to ACfiB re p el 1 et-c Ivuldinn interac li on GE
praparatlon of nonproprlo tnrij version oF Doeumont 3 delayed.
Request for Document 17 withdrawn Forwards Document 33
FEUTON.J M Division of Rules and Records flO/O7/aa lp
— 800731031'J Draft request foi oddl data ro reactivity initlatert atcident
fuel behavior Data will bit uned In developing Improved fuel
damage limits d accetitancE criterln for licensing PHRs t<
DHRt
DGNTON.II R QPtlte of Nuclear Roactor Rouulatiom Director
QO/07/Ba 3pp
QEN TEC IS OENEfHC TECHMICAL ISSUES
— B00731026S "Equipment Qualification Test fiummary t>F Borne Enuipmsnt
Tilted at Franklin Raiearch Ctr." nonpr opr i etary vtr-iion
» Franklin Insti tutB/Franklin fies«arch Center HO/07/24 97p|i
— H0073 10369 44350-1
"Accident Qualification Test Summary of Qualification
letting. " prepared for EG&G IDi Inc
GARRISON, W A , HALL. R A , tUMDRD-L.M J Mgle Laborator Us
BO/07/Z4 7Bpp
B007310262 Appeals denial of FOIA requeit for lilt of environmental 1 y
qualified equipment NRC failure to adhere to procedural
requirements of FOIA constitutes Illegal denial oP request
KNUTHiDF Herr-McOefl Chemical Corp (*ub« of HBrr-McOeo Corp J
BO/Od/lB Epp
0007310276 Respond! to FOIA request FDT info r* inilustrial use of
radioactive magnesium-thorium alloy i< antj uorli-rvlatgd
problems associated u/u>e MD records available tubj to
request Forwards documents listed in App A U/o encl
FELTON.v M Division of Rule* and Record* QO/07/S4 2f>p
B007310380 FOIA request for info re industrial UB-B of radioactive
magnesium-thorium alloy fc any work-related problem*
atioctated u/uie
FARNAN. J Affiliation Unknown BO/ 07/07 lp
6D0731D4B1 Response to FOIA request For documents ro tram pnr tat Ian of
•pent fuel from Portsmouth, VA to Savannah River Plant In
Alkm>BC Encl info partially withheld safeguarding
procedures t> security measures (reF FOIA Exemption 4)
FELTON.J M Division of Rules and R»cortia 80/07/22 3pp
— H0073104B3 Confirms BOOB20 telcon. notifyino NRC that Pegas« Caslk 1
contains 36 irradiated fuel elemtnt* k mill arrive in
Portsmouth. VA Info partially withheld dote of arrival <nf
FOIA Eiempfcion 4) NRC fee determination encl
STONEBURNER,W Trancnuc lean Inc. 164B7. BO/OB/20 Epp
BOQ6IEG85S Formflrds NWREO/CR-Kiai OE rumminos will be addffd to svc list
tar Future repts emanating Cram g^neiic task re sijs
Interaction U/a encl
D Systems Interaction Branch CO/05/aa lp
0007030015 "Cnd* Assftamonb *i
Dependent Damping Btudy "
ORUBB.H L tO(<0 Idaho. Inc
ications Program Piping Sijt Stress
TIN A-ftlSfo 79/10/31 SOpp
UO0707O249 Forwards commflnts tin NUREQ-Oi.1V Bys change* >ueh as lou flow
FaeduiBter control k rcroulina of reactor uater cleanup sys
should only be implomun tod tiased on plunt unique evaluattflns
dornons trot ing per form.Tnce impruvcmon t
L Ocn*ral Electric Cn MrN-lll-OQO BO/06/19 Hop
8007310433 Hunrniary HI f third technical BoOB15~lA monting in Be thesda, M»
re ta»t ocUrjn plan A-l 1 progress. l< future plann
JOHNSON, R E Generic IBEU«O Bronrh HO/O/i/13 Ipp
— 8007310430 Not! f i c .itlnn at tJUi il technical 700&13-U mentlng in
Dolhe»da. MR to diacuss task Jiction plan A-l 1 progrB»B fc
future ^lani
JDMNSflM. R C Connilc IBSUOE Dranth SO/QS/Ob 4np
P0073!OaSb Not i ficat ion of BO07^C~31 mBetinfla Mi/vonilori !i tonsultanti
In San Jose. CA to ilkscusR n.irk III UOCA-relatad pool
dynamic load criteria
FIELDS. H Containment Systems Dranth QO/07/ai 4pp
IrjgPECTIDN AMD ENFUHCEMENT
79102S0495 1C Circular BO-1J. "f.nd Strap Damage in Wo»t InahouiB Fuel
Aisairbl IBB "
* Offlte of- Inspecting !< ETuforepmer-t. OFFlce of the Director
BO/OS/aS 2pp
B00aa806&l IE nmi»bin H0-13. "fradcing ill Core Efirau Spargor* "
» Office of Inspectinn Jv Enforcement. Office of the Director
SO/05/12 3pp
378
NOIMDOCKETED ITEMS
B00434Q21O PNP-EQ-Ql on BCO313, Upst inghouse notified IE of pending
10CFH21 Itr re potential cracking of control rotf guide tube
support pins in foreign FWR Vendor proposes pin fnsp
program involving two domestic plants currently down
HDDD9. R Office- of Inspection & Enforcement, Office of the Director
NOONflN.V Engineering Branch SO/O3/13 Spp
B0043402SB PNQ-1 1 1 -BO-43 on B003D&. li c pnsee 2S~Q0097-Oi received Po-210
static eliminator 6ar From 3D Warren Co, West Brook, ME. that
was leading Delivery truck Pound contaminated DDT. state.
Region I b carrier notified
PAPERIELLO.C O . DWIS.A B Region 3, Chicago, Office of the
Dlrettor OO./C-3/O7 lp
8004240273 J*NO- 1 1 1-BO-lfc Licensee 4B-Q0537-06. reported g-mployBB working
in radiation therapy dept ui/Ca-6O unit had whole aodg badge
rept of 5 3 rems For period BOO 1)0-02 10 Licensee mill
conduct formal review !. sulmit 3O day rept
PAPERIELLO. C . DAVIB-A D Region, 3. Chicago. Office of the Director
BO/03/13 lp
0 004 34 O3 16 EH-BO-001A on B0031O, order imposing civil penalties issued
For Liconte 29-07314-01 Action baled on Sii item* of
non compliance re IDES of 55 Ct Ir-192 s-ourc e, e> posure to
individual f. failure to rept Ins a
BnOCKETT. T Office of Inspection i. Enforcement, Office of the
Director THOMPSON, D Eiecutive Officer for Operations Support
aO/03/10 lp
GOO 3 020 572 PNO-1-BO-Q52 on QOC-331 • Region 1 wai not 1 fieri bu Info
Technology. Inc of receipt of viol labeled Xe-133 Vtal had
been included in shipment from licensee Vial was shielded
Only background levels of radiation measured at surface
OLENN.J E , SMITH, 0 H Hog ion I, Philadelphia. Office of the
Director BO/04/01 lp
6005050047 !E Info Notice 80-24, "Lou Level Radwaste Burial Criteria "
* Office of Inspection & Enforcement, Office of the Director
90/05/30 5pp
800505005& IE Bulletin BO-14- "Degradation ot DWB Scram Di scharje Vol
Capability "
» Office op Inspection t« Enforcement. Office of the Director
BO/06/ 13 Sp p
8003030059 IE Info Notice BO -22- "Breakdowns in Contamination Control
Programs "
» Office of Inspection fc Enforcement. Office of the Director
60/05/29 2pp
BD05030061 IE Info Notice HO-23. "LOBS of Suction to Emergency
Feeduater Pumps "
* Office of Inspection tc Enf orcemantf Office of the Dirictor
60/05/2:9 lp
B003O50Q74 IE Circular 80-14, "Radioactive Contamination of Plant
Demineraliied Mater Bus E. Resultant Internal Contamination
of Personnel "
» Office of Inspection t. Enforcement, Office of the Director
SO/Oo/24 Spp
BD07140E.21 PNa-W-fiO-023 an BOOt24.aH pffsite pouer to both units uat
Init when tuio linet mere tripped by dispatcher Third line
UBB out of svc for mat Tit
HUNNICUT7.D Region 4, Dallas, OfPice of th» Director BO^Oi/25
2pp
B007230143 EN-BO-02B on 600703. order issued renuirlns prompt
1-Bjuttag ing of waste byproduct mall fc prompt transfer to
authorized land burial Facility Action baaed upon llcenite
agreements in 300701 meeting lu/Region 1 ofc
BROCHETTjT , THOMPSON, D Office of Inspection & Enforcement, Offic*
of the Director HO/O7/03 lp
6OO7330216 PHO-I-SO-O1?? dn BOO71O, SO Blueitein reported thit package
containing * fl mCi 1-131 had been stolen from private
automobi 1 e
KINNEMflnW D . SMJTH. 0 H Region 1. Philadelphia, Office of the
Director BO/O7/10 lp
BOO724013B PND-V-BO-O59 on BOO7I7, Reg ion 3 ofc notified that tUO
vhipmenti of 14 mC 1 1-125 had been damaged in ihlpment
fnspectors despatched to inspect shipment Radiological
survey detected no contamination
THOMAS.R D Region 5. Ban Francisco, Office of the Director
BO/O7/1S tp
8O0725O197 FNO- 1-30- 102 on 80O717, presauro trantlent c*UB»d triple low
water level signal followed bu reactor loui Lister level
I cram Cold shutdown underway for further analytis of
inc idrnt
KEIMIO, R R Reoloti 1. Philadelphia. Office of the Director.
90/07/1B Spp
6007390058 PNO-I-90-1 01- on SOO715, plant trlnpid from 10OX power due
to water leakage on coolant pump penetration* Possible
damage to coolant pumpi & penetrations ii being
investigated
HEBELOWBKl.T Region 1, Philadelphia, Office of the Director
HO/07/1& lp
8007290331 PNO-IV-SO-02-1 > on BOO716,plant uas shut down due: to prlmarg
to secondary leak Hai radioactivity detected uai be low Taeh
Spec limit
•JOHNSDM.H D Region 4. Dallasj Office of the Director SO/07/17
lp
PUBLIC DOCUMENT ROOM MISCELLANEOUS
B003Q30063 IE Info Notice 9Q-2fl, "Prompt Reporting of !nfn in
Accordance W/1GCFR50 55(e> "
* Office of Inspection k Enfopcement, OfPiee of tin Director
flO/Ofi/13 lp
B004O10434 GuggeEts that rushes toward opening eiiiting powar plants or-
Itartlng const on neu plants should be weighed ul/precaution«
for safety ii safe JiapCifll of nuclear waste
NEIL50N,L E Affiliation Unknouin BO/03/31 lp
800 &0 3 006* IE Info Notice £0~2&j "Evaluation of Contractor OA
Proarams "
* Office of Inspection t. Enforcement. Office of the Director
HO/06/10 Spp
BOO&050066. IE Bulletin 30-16, "Potential Ml tapp 1 1 cation of RoBem
Inc, Models 1151 J< 1 1 53 Pratsure Transmitters "
* Office of Inspection b Enforcement, Office of the Director
B0/0&/27 hff
B00503OO67 IE Circular E3O-1A, "Op ernti ona] Deficienci** In Rosemount
Model 510DU Trip Units & Model 1(32 Preeture Transmitters "
* Office of Inspection h Enforeement. Office oP ths Bir*etor
e 80-27, "Degradation of Reactor Coolant Punp
i & Enforcement, Office of the Dirmtor
iss of Emergency No tificatlon
fice of the Director
BOO 320 0366 Ack receipt of BO031H resolution in mppDrt of nuclear
•energy adopted by Morthumberlan* County Board of
Supervisors Certain short-term tas k s, identi f led in TMI
Action Plan. must be completed prior to OL issuance
KAMMERER.C Office of Congressional Affairs 80/04 /SS Spp
BOOtl2O40a Dlicuases reasons Par delaijs in licensing new nuclear
plants, kn response to BG0434 requests re MA Coigrove
comments Delays caused by po.st-TMl efforts to improve saftty
at operating plants
HAMMERER, C Office of Congressional Affairs flO/05/ffO Spp
BOD&120419 Responds to 8CO423 re L Nutter concerns about nuclear plant
siting t evacuation plans NRC not responsible for deci«ion
rs wheather an not nuclear paiuer should exist in UB
Proposals to stop nuclear power development not enacted,
KAMMCHER.C Office of Conovessiana I Affairs BO/05/O7 2pp
BDOA1703O4 Informs that Ofc of Technology Aamsment has been assigned
to review t< evaluate current status of nuclear pouer plant
standar iuat i on NRC assistance is requested to ensure that
vlBius of all parties of interest are represented,
JOHNS, U S Congress (Joint E< Rotating Committees, etc > BO/06/11
Spp
>p Coolant Pump Cool ing St
ice of the Director
BOO7Q20Q&9 RttponJfi to encl HW Will B 004 30 inqmrv re safaty alpecti of
military nuclear plants vs commercial nuclear1 plants NRC not
responsible for licensing military plants DOE, Div of Naval
Reactors, should be contacted
D1RCKS.U J Office of the Executive Director for Operations
BO/06/E4 Spp
380
NONDOCKETED ITEMS
— BQ072TO036 Informs that firm lias been selectd tiy major poujsr company
to design new nuclear pauer plant operator training
facility R-equests meeting to discuss hou firm may be of
assistance to NBC
O'NEILL. 7 V Lester B Knight t, Assoc lates. Inc BO/06/26 Ip
~-BQ070901c>7 NURCG/CR-1BBO V2
"Human Engineering Guide to Control Roar
re human engineering guidelines
MALLORY, K , FLEGEH, S , JOHNSON, J Essei
BO/OB/31 140pp
Eva luatlon.
Vol a
Corp NRC-04-79-3O9
BOOT29OOB9 Responds to BOO324 Itr re nuclear pouier Foruards Chapter 5
of at President Cartcr'e Second Natl Energy Plan
DENTON.H R dFFiie of Wuclear Reactor Regulation. Director
£0/05/14 15pp
B007090314 Requests (intension of comment period until at least B0091S
re NUREG-0577 t, amends coveied in B00519 Itr Significance ft
possible impact of bath documents may not presently be
recognijed *< justified
CLAVTON.F L Alabama Power Co BO/07/O3 Ip
NUREG REPORTS AMD RELATED CORRESPONDENCE
00O701O-fl98 Forwards comments of Internrganl lational Advisory Committee
on Radiological Emergency Planning i Preparedness on NUHEG-
D6B4 & NRC statement of interim NRC policy on stockpiling
potassium iodide, in response to BOQ5QB & Q9 Itrs
MANCUSO, F- Connect I cot. State of SO/06/HB 9pp
B00702O396 Advises that Hrs to OL appl icantsi CP holders t, licensees.
which contain NUREG-OficiO requirements are being preparBd For
CL applicants ti CP holders. NRC uilll UGH requirements
presented in Encl I of SECY a 0-2 30
EISENIIUT. D G Division of Licensing 80/0i/02 3fip
BOO70303SO NUKEO/CH-I 316
"Solubility Classification of Airborne U Products Collected
at Perimoter of Allied Chemical Plant. Metropol is. IL "
HALWARF.D R Oattcllo Memorial Institute. Pacific Northwest
Laboratory FIN D-21339 PNL-3aBB BO/OS/31 34jip AvallabU at
NTIS
S00703O339 Advises that C Mtchelson concerns, original ly addressed to
C-E Sijs BO d-ss.igns. shoul d be forwarded to HtW Responses
nr-caaaary by 791011 for NURFZO-0565 un 1 teup
flQSZTOCIV, Z U TWI-2 Bulletins J, Orders 79/09/Oi 2pp
8007070331 Comments on NRC 800520 Itr ro addl guidance, on NUREQ-0577
Proposed review procedure should be revised to reflect
applicants of plants ui/o CP uitio have fabricated RC9
component supports
LENISCH, J W Portland General Electric Co JUL-269-HO SO/Q7/02
IP
B007090362 Summary of BOOilB meeting ui/QHR ounors group re plans for
satisfying safety b relief valve test requirements par
NUHEG-037B. Section 2 I 3
HEMMlNGERpEQ Mechanical Engineering Branch BO/Oi./2i 6pp
B007090371 NUHEG/CR-I5S3
"GFACTOR Computer Code for Calculating Dose Equivalent to
Target Organ per uCi-Day Residence of Radionuc 1 i do in Source
Organ. Supplementary Rept "
DWNING.D E , PLEASANT. J C . KILLDUSH. G 0 Oak Ridge National
Laboratory FIN D-OiBB DRNL/NUREG/TM/- BO/05/31 130pp
Available at NTIS
0007100363 NU!?EG/Cn-OaOB Rl
"Pulsed Neutron Activation Measurement of Emergency Core
Coolant Bypass Floy on LOFT Reactor "
KEHLER.P Argonne National Laboratory BDLDRI0, C W EGiO,
ANL-CT-70-37-2 BO/06/30 94pp Available at NT1B
SOC-7030373 HUREG-0597
"Usor'a Quid* to GABPAfl CodP "
ECHEHUftN, K F . COMSEL.F J Assistant Director for Environmental
Technology RDECKLEIN. A K Occupational Health Standards Branch
SO/Oi/30 gftpp Available at BPO *3 73
B0071003t9 NUriEG-O66S DRFT
"Staff Revieui of Rad loecol oglcal AsscsBment of Wyhl Nuclear
Pouer Plant." draft summary
BRANAOAN.E F , CQNGEL.F J , CARD1LE.F P Assistant Dlrvctor for
Environmental Technology HO/O6/30 17pp
B007030374 HUREC-OS61 Rl
"Physical Protection af Blnpments at Irradiated Reactor
Fuet, Interim Guidance "
• Office of Muclear Material Safety t. SafeQuarits BO/06/3O 7ipp
Available at OPO *3 79
BOQT070249 Foruards comments nn NUKEG-Q619 3y« changes such as low rinu
feeduater control R rerouting of reactor uiater cleanup iys
should only be implemented based on plant-unique evaluations
demonstrating perf ormanc e improvement
OB1DLEV.R L General Electric Co MFN-lll-OBO 80/06/19 llpp
BO-D7070351 Comments on NURFQ-OSBB "IntDrlm Staff Position on Environ
Qualification of Sa Fettj-Rclated Electrical Equipment "
Generic requiremert for typo testing may restrict available
means For qualification u/o ponitlvc validity of results
SCHERER.A F C-E Poucr Systems LD-BO-03B BO/Oo/27 3pp
BOO709O015 BECY-BO-27S
Discusses f ma 1 1 lat ion oF emergency planning ruin changes.
including consideration o (• public comments Recommends FH
publication re Fin.il rul emaking Related documentation incl
H1NDGUE.R D OFftte of Stondards Develgpment. Director BO/06/03
149ap
--B007090017
Draft "Environ Assessment for Effective Changes to 10CFRSO
& App E of IOCFRSO, Emergency Planning Rnqmrements for
Nuclear Power Plants " Related documentation encl
DTTuWS Division oF Siting. Health t, Bafogosrda Standards
90/06/30 S4nfl
BOO7090163 Formards "Human Engineering Guide to Control Room
Evaluation " final rept.Vol'i 1 tt S re control room
evaluation process t, human engineering guidelines.
respectively
MALQME.7 B Essex Corp EKJ/06/30 Ip
— 9007090lf.fi NUIfEO/CR-lSQO VI
"Human Engirieering Guide- to Control Room Evaluation."
Vol 1 re control room evaluation procnss
MALLORV. K , F1ECER.S . JOHNSON. J Essex Cprp NRC-04-79~a09
80/08/31 lOOpp
D00711019S Ack receipt of 800113 Itr e«prassing concern w/proposed
approach to ATWB in NUREO-O-liO. Vol 1
DENTON.H R Offtco of Nuclear Reactor Regulation. Director
BO/0&/04 Ip
— 8007110203 EipresseB loncern on behalf of ouners of C-E designed tt
operating NEBS plants re approach to ATUB in NURCO-04fiOi Vol
4 NRC on coitriie that will prescribe resolution to ATUS tislla
a/o due regard to industry comments
LUNDVAUUM E Daltimorp Gas (. Electric Co 80/09/19 2pp
--BD07110S07 Toruarda comments on NUREO-OlbO. Vol 1 re ATW9 on behalf of
owners of C-E NBSB power plants Issue about to be resolved
bij NRC <ii/a consideration of many relevant views More
detailed Lommenta will be submitted in Jul 19BO
LUNDVALU.A E Daltimnre Gas t< Electric Co QO/O3/13 4pp
B007110439 Responds to B0011B Itr transmitting roaolutlon ra public
health Implications of nuclear power plants NUHEQ-0&S4
requires that public info program be developed jointly by
utll.stnte t. local officials
GRIMEHiD K Emergency Preparedness Task Force 80/06/53 Bpp
— S007110443 F~oruar<ts resolution re public health implications of nuclear
pouior plants NRC should support future legislation dealina
u/safety t< guidelines for safe handling of nuclear matli fc
uastes RequesLs that response be sent to H Whitman
BAKER. T Student Nurses Association of Pennsylvania GO/01/1B
3pp
B007110453 Submits comments on NUREO-O577. add 1 guidance re major
component support loin-alloy bolting NRC should consider
reduction In mai postulated flaw depth Si Include acceptable
conversion table between yield strength & matl hardness
COOPER. H E Tcledyne Engineering Services B09-Q4S BO/07/03
13pp
B007 110360 NUFJEO-06BO
"TM1-1 Restart. Evaluation of Licensee Compliance U/
Short- d Long-Torm Items of Section II of NRC Order
Dtd 790809, Met Ed, ot al "
* Office of Nuclear Reactor Regulation. Director » Diviilon of
Licensing BO/Oi/30 230fip Available at NTIS
NONDOCKETED ITEMS
381
80071400B3 Forwards comments an NUREG/CR-13BO tlept shows that uirtter
is not aware of many positive aspects of civilian protram
Differences between Navy & civilian programs mere not
discussed
PARKER, W 0 Duke Pouior Co BO/06/ !1 fcpp
B0071B0031 NUHEG/CR-1460
"LUR Safety Rebeflrrh Program Quarterly Progress Rept Qct-Dcc
1979 "
MASBEY. W E . KYGER.J A Aryunne National Laboratory FIN A-2014
ANL-BO-43 BO/OS/31 37pp Available at NTJS
B007110092 NUREG/CR-1459
"Experiment Data Rapt for BemiBciile Mod-3 Small Drea
Series (Tests S-SD-S & S-SB-BA) "
MIYA9AKI.D H EG&O Idaho, Inc CGQ-2O3B BO/06/JO
331 pp
8007140336 Forwards "emergency Procedure Guidelines" for BUR Dinners
group, per NUfiEQ-Q37EIi Requirement 3 I 9 Description of
how analyses of NEDO-247QB ti emergency procedure guidelines
apply to all FSAR Chapter 15 events Forthcoming
BUCHHDLZ.FI H General El citric Co MFN-117-BO 00/O6/30 4Opp
BOO714Q357 Requests eilension of completion date. until GQ0913, for
comments on NUREQ-0377. "Potential for Lom Fracture
Toughness t< Lamellar Tearing on PUR Steam Generator tc
Reactor Coolant Pump Supports "
HIDNERiU A Georgia Pouor Co BO/07/07 Ip
B007140373 Forwards comments on NlJHEQ-0377 Sand i a rept considers only
mat Is used in component supports at responding nuclear
plants & classifies plants accord Ins t° susceptibility to
brittle fracture u/o considering all factors
ZARAKAS.P Consolidated Edison Co of New York BO/07/07 3pp
B007140610 NUHEQ/Cn-1464
"Review of Hue 1 ear Pouter Plant Offsite Power Source
Reliability E( Related Recommended Changes to NRC Rules t<
Regulations "
BATTLE. R E , CLARK, F H , REDDOCH. T W Daft Ridge National Laboratory
FIN 0-0235 ORNL/NUREO/TM-3 80/03/31 113pp Available at NTIS
0007140617 NUREG/CR-1B58 V2
"Imp Methods for Physical Protection Project Annual Rept.
H«r 1979 through Fed 1980 "
BRADLEY, R T . BQWDEN, D D . OLSON, A W Lawrence Livermare Laboratory
FIN A-0143 UC I D-1B1 23-79-4 BO/06/30 3Spp Available at NTIS
8007140701 Comments on NUREQ- 0654 emergency response plans must be
simple to use It understand Nuclear mystique must be
considered in houi t< when to notify public to prevent
count erproduc ti VH rsat tions
VANDENBUHOH. D E Yankee Atomic Electric Co HYC 60-13 BO/05/30
llpp
B0071304Bc. Forwards comments on NUREO-OS77 Main yield strength used
to determine ausceptib 11 i ty of mat! to stress corrosion
cracking should be 100 ksi.for consistency u/aandia rept
(Page C-23) recommBndationB
LOOMlSiJ S Sargent !. Lundy- Inc 80/07/07 2pp
GO071B0049
"Development of 'Good' Physical Protection Plan Capability
73 45<b) "
BENNETT, H A . flLASCOAGA, M T Sandia Laboratories BLOEDEL. B A,
Allied General Nuclear Services FIN A-1133 b'ANDaO-7O37
80/03/31 I50pp Available at NTIS
NUnEG/CR--lflS3
"RadionuclHle Detaij Data Dnse Indei F. Summary Table "
KOCHER. D C Oak Ridge National laboratory FIN B-01HB
DRNL/NUREG-70 BO/05/31 39pp Available at GPO
BQ071BQ073 NUREQ/CR-1 169 V3
"Bafejuards Vulnerability Analysis Program (6VAP> Uoer'a
Manual "
DRVIS, W J Laurence Livermore Laboratory TIN A-0113 UCRL-5a730
90/05/31 97pp Available at NTIS
BOO721O391 Discusses 800713 !. 17 telcon r« d ef-ini tion Sc imp 1 amentdtion
of NUREG-O660 requiremenlE fur modifying HPCI/RCIC
setpoints BUR owners group recommendations probably not to
include mods to satpoinls, due to negligible reduction
BUCHHOL2,R H General Eleetiit Co , Nuclei!"- Energy Products Div
RHB-057-BO BO/07/1 1 2pp
B007210491 NUHEG/Cfi-1500
"Beismicity H Tectonn, Relati nnsh ipt oP Nirmahii DJI 1 1 f t in
OK Part III "
LUZA.K V . LAWBON.J F. Oklahoma, Univ oP FIN Q-&967 SO/06/30
79pp Available at QPO t 79
8007320019 NUREQ/CR-OB30
"Monitoring Random Errors of Nuclear Mat] Measurements "
BROUNB.R J . HOOERTB,r P , MERRILL. J A Ilattelle Hemorlal Institute,
Pacific Northuii"it Laboratoiy FIN B-20147 PNL-3033 BO/06/30
39pp Available at NTIS
BOQ7220034 NUfEG/CR-1331
"Insider Threot to Secure Kic 1 1 1 ties Data Analysis "
HEINEKE, J M Lawrence Livormnre Laboratory TIN A-013S
UCfiL-53744 GO/06/30 76pp
B007S20034 NUREG/CR-1 1 IB
"Distribution of Illegal Incident Characteristics Cases oF
Dunk Fraud t< Umbei i lemont, Computer-Rvlateil Crime J( Insider
Theft from Druu Manufac turprs. !i Distributors "
HEINEKE. J M Loujrence Llvurmoro Laboratory FIN A-OIPH
UCRL-92743 BO/06/30 136pp
0007160457 Comments on NUREG-79/087 NHC personnel draftinfl SRPs are
confusing responsibilities NRC is incorrectly providing
design details & design philosophy
HALTEfi.J F Energy Products Group BO/06/06 3pp
fl0071fi04fl9 Respond* to NRC B00520 request for comments on NUREO-0577
Request raqulros significant onflineerlng effort due to util
five plants u/three different designs Add] three months
(until Oct I960) required to develop thorough comments
RENDERQER.D L Wastilnoton Public Pouer Supply System 003-80-143
BO/07/09 Ip
B00723036B NUREO-0694
"TMl-Relatod Reiiuirementt fur Neu 01 s
« Commission OO/06/30 413(1 p
8007330201 NUREG/CR-1333
"Critical Eiperlmentsi Mcasui ements Ei Analyses to Establish
Crack-Arrest Methodology fui Nuclear Pressure Vessel
Steels." progress ropt June-Dec 1979
ROSENriELD.A R , ADOU-8AYfiD, 1 . QII.LOT.R Dattelle M»morlal
Institute. Columbus Laboraturins FIN A-4O46 DMI-3064 UO/06/3O
4Bpp Available at NTIS
8007160491 Comment! on NUREG-0577, "Potential for Lou Fracture
Toughness & Lamellar Tearing on PWR Steam Generator fc
Renctor Coolant Pump Support* " Every path to integrity
demonstration should be left open to licensee*
BCHERER.A E C-E Pouief Systems LD-BO-04 1 BO/07/09 3pp
B00716049S Requests eitenalon of comment period until B0091S for
r»viewinn "For Comment" edition of NUREO-O377 t, providing
significant comments
DRAPER, E L OUlf States Utilities Co RBO-7964 BO/07/07 Ip
B00717031I NURE«/CR-la93
"Methods for Assessing Background Levels of Radiation &
Radioactive MatU in Environ Around U Mills "
HAOMAN.N A , BILKER, W » , OLiaSMEYER.J A Dattelle Memorial
Institute, Pacific Northwest Laboratory FIN D-3121-B PNL-32S6
BO/04/30 9Bpp Available at NTIS
800717061B NUREO/CR-1513
"Evaluation of MatU Interactions for Advanced Reactor Bys. "
annual progress rept
8HAN80N.D 0 , VAN PAABSEN. H L Aerospace Corp FIN D-1130
ATR-BO<7B14)-1 BO/06/30 73pp Available *t NTI8
8007330203 NUREG/CR-1440
"LWR Statui Monitoring During Accident Conditions "
VONHERRMANN. J . HHOHN- R , TOMF,A EGJ.G Idaho, Inc
EOO-CA-5133 60/06/^0 ff05pp AvailsblD at NTlfi
FIN A-6S74
6007230435 NUREG/CR-1361
"Draj Devices For Tuo-Phase Mass Flpui Measurement t "
ANDERSON, J L CGt<Q Idaho. Inc FIN A-603EI EGti-H023
56pp
B007240132 Ac k receipt of B0061rl Iti- to Chairman Henilri» e>pressing
concern re NRC approach to A TWSi (NURtG-OdflO) Si i-aquestlng to
address Commission ON same day as NRC presentation First
session will be devoted to NRC personnel only
DIRCHSiH J Office uf the Eipeutive Director for Operations
80/07/01 Ip
— B007240135 Expresses concern re NRC approach to ATWS issuas Requosti
response t<i encl comment1. t< opportunity to make preoonta ttnn
on day th'it NRC presents issue foi consideration
LEE, D Atomic IndUBtri.il Fiirum BO/06/1B 1 1>
362
NONDOCKETED ITEMS
— SQ07240137 Forwards paragrsgh tp
to address NF1C un ATUE IGSLJ*>
TFHJBAT"fH,B OFficp of tlie (.en
be included in response to AIF request
sral Counsel 80/06/34 3pp
8007340262 MUREO-0030 V3 N02
Yellow DooV "Contt Status Ropt Nut 1
as {iP BOO 4 3d
» Office OF Nunagement anil Program Analysts
Available at NTIS
Comer Plants, " data
5Dpp
8007210303 NUREG/CH-0570 V2 APP
"Technology. Safety !, Cobts of Decomm] as t on! ng Hef Lou Level
Waste Burial Ground," App.Vol S
MUHPHV.E S , HOLTFR.O H Hattelle Memorial Institute, Pacific
Northwest Laboratory FIN A-2136 00/Oi/3Q 167pp
•B00734O394 NUREG/CR-1357
"Steam-Hater Muring t, Sys Hyflrodynnml ca Program. Task -I."
quarterly progress rept Apr- June 1979
COLLIER, W P , BISHOP. T A , uWORAK, J A Battelle Memorial Institute,
Columbus Laboratories FIN A-404B BMI-203B 80/07/31 Hipp
Available at NT1S *4 3D
6007340409 MUREG/CR-14B6
"Seasonal Varintinn of 1O Square Mi 1 e Probable Ma«
Precipitation Estimates - US East of 105th Meridian."
HydrometEDTD 1 ngic a 1 Rept 53
HP.F P , RIEDEL.J T CamniDrc e. Dept of, National Dceanographi c t,
AtiDD»ph«ric Admin strati on 90/06/30 93pp Available at NT1S
M 00
0007 2907 B 1 Request fnr stay of ef f ectivenosa of Commission BOQ616
abatement of policy ro guldanre for power reactor OLs,
pending judicial review Commission action endorsing NUREQ-
Oi94 may be unlawful Certificate of Bvc encl
WEISS, E ft Union of Concerned Scientists LATHAM, S D Bhoroham
Opponents Coalition UE1BB.F- R Bheldon, Harmon !. Weiss SQ/07/2S
16pp
— B007390B03 Affidavit stating that current NRC regulations re hydrogen
control measures are not adequate to insure health & safety
NUREQ-Oi94 does not correct hydrogen control deficiencies
Prof qual t f icationa encl
POLLARD, R D Union of Concerned Scientists 80/07/10 12pp
--8007290809 Affidavit re need to analyie ays interaction due to
insufficient Info for unresolved Safety Issue A-17
MI NOR, 0 C Shoreham Opponents Coalition BO/07/11 9pp
8007300041 NUREO/CR-1360
"Evaluation of Docket Files for Terminated SNM Licenses "
HOLOUAV, C F , LANTZ.P M . DICKSON, H U Oak Hldgu National
Laboratory FIN A-9095-7 DRNL/NURES/TM-3 BO/0&/30 B6pp
Available at NTIS
8007300152 Forwards comments an proposed SRP 3 9 t>, Revision S Incrland
costi appear to be greater than those described in impact
assessment Paragraph 1 1 a re valve d pump testing should be
deleted
VAN BRUNT, E E Arnona Public Service Co 43FR36SA COS BO/06/57
Spp
"Uaor Guide to EP 1C, Computei Program to Calculate Motion of
Fuel fc Cooiant Subsequent to Pin Failure in LMFDH "
PIZZICA.P A , GARNER, P L , ABRAMGQN. P D Argonne National
Laboratory FIN rt-2015 ANL-SO-47 79/10/31 123pp Availablo at
NTIS
8007300575 NUREQ/CR-14S3
"Bloudouin Heat Transfer Separate Effects Program for Jan-Mar
I960," quarterly progress rept
CRADDICK.U 0 , ANKLAM.T M , BDHANAN. R F Oak Ridge National
Laboratory FIN B-0125 ORNL/NUREG/TM-3 00/04/30 Iflpp
Available at NTIS
NUHEO/CR-MS9
"Best Eitimate Method vs Evaluation Method Comparison nf TUD
Tecnniquas in Evaluating Seismic Analysis t< Design " Seismic
safetu margins research program
HUMPUS.B E , JDHNBON.J J , BM1TH.P D Laurence Livermore Laboratory
FIN A-0130 UCRL-92744 tJO/07/31 llipp Available at NTIS
*4 25
B0072H030B NUHEO/CR-1 440
"LWf? Status Monitoring During Accident Conditions "
VDNHERHMANN, J . DROWN. R , TOME. A EGf.0. Inc FIN A-6H94
EGO-EA-9133 BO/Ofc/30 209pp Available at NT18 »6 00
BOOJSeO3b7 Submits comments on NUREQ-0&I9 Bur, changes For both
foediuater tc contri)! i od drive sys cannot be implemented by
proposed rfatet June 19B3 forecast as earliest completion
date
JANECEK.R F Commanuieal th Edison Co BO/07/33 3pp
8007280633 NUREO/CH-1530
"Eiperimertt Data Rept for LOFT Anticipated Transient
Enperiment 16-!i " EGt.0 foruarding I tr end
STITT, D D , CAHPEHTER, J M Idaho National Engineering Laboratory
FIN A-604a EOQ-2O49 BQ-/07/31 155pp
B007290149 NUREO/CR-OSOQ
"Secui-ity Comraunicatlon Bye for Nuclear Fiied Site
Facilities "
HOH1NOTON, L C Union Carbide Corp TAYLOR, L L Bernard
Johnsan, Inc FIN D-OJ1B-7 Y/DW-12B 80/07/31 192pp
BO0729019a
"Prompt Burst Energetics Eipsriments Fresh U Carbide/Sodium
Senas "
REIL, K 0 . VOUNO.M r Bandla Laboratories FIN A-1016
BANDBO-OB2O BO/OB/31 I36pp /
B00729O2S1 «JR£G/fR-O7fl3
"Transpor ta linn of Rniflonut 1 1 tfes in Urban Environs Draft
Environ Assessment "
RNLEY.N <; , DANIGL^B L . HENNING-SftCHB, C Bandla Laboratories
A-1077 SANa?9-03fc9 BO/O7/31 500pp
80072I?OAB9 Comments on NUREO-0577 Large usld repairs made under
restraint & poacitly poor access could crack Structure
could possibly became unsafe tt fait
KASC&AK.R M Long- Island lighting Co 90/07/33 2pp
1
8007310004 NUHEO-0304 V4
"Regulatory t, Technical Ropts, " compilation for 1977
OLIU, U E , MCKENZIE, L . ARAQQN, R Systematic Evaluation Program
Branch (Pre 791030) 79/12/31 30Opp
B007310007 NUOEO/CR-11B4
"Evaluation of Simulator Adequacy for Radiation
Qualification of Baf ety-Related Equipment "
BDNZON,!- L . BUCKALEU, W H Bandia Laboratories FIN A-10S1-0
BAND79-17B7 BO/05/31 SOtpp
B007310009 NUDEO/CR-1530
"Eiperlment Data Rept for LOFT Anticipated Tranaient
Eiperlment Lfi-3 "
BTITT, B D , CARPENTER, J M EQt.0 Idaho. Inc FIN A-iOflB EGO-2045
BO/07/31 ISIpp
B007310113 Notice of entenaion of public comment period for NUREQ-0577,
re potential for ] DUI Fracture toughness b lamellar tearing
on PUR steam generator & reactor coolant pump supports, from
000721 to OBQB
ERNST, M L Assistant Director for Environmental Technology
BO/07/ IB app
B007310H10 NUREQ/Cfi-1301
"Analysia of Organohaloaen Products from Chlorlnation of
Natural Maters Under Simulated Diofouling Control
Conditions "
BEAN, Fi M , MANN. D C , RILEV, R O Dattetle Mtmorlal Institute,
Pacific Northwest Laboratory FIN B-309B PNL-3375 BO/06/30
90pp Available at NTIS *1 25
BQ07310S16 NUREO/CR-1SB9
"Evaluation of Isotope Migration - Land Burial, Water
Chemistry at Commercially Operated Lou Level Haduaste
Disposal Sites," status rept through Sept 1979
WEISB, A J , COLOMBO, P Droolihaven National Laboratory FIN A-3042
BNL-NUREO-51143 80/03/31 294pp
B007310317 NUREQ/CR-1439
"One Dimensional Neutron Kinetics Model for THOR Cod*,"
final rept
LAURENCE, R D . CHIANS, R T Drookhaven National Laboratory FIN
A-3014 HNL-NUREQ-Slie? BO/04/30 3ipp
0007310333 NUREO/CR-1119
"Piping Inelastic Fracture Mechanics Analysis "
CHANQ.C I , NAKAOAKI.M , GRIFFIS, C A Navy, Dipt, of , Naval flecearch
Laboratory FIN B-65B7 4359 BO/06/30 91pp Available at NTIS
NONDOCKETED ITEMS
383
0007310931 NUREQ/CH-O742
"Review !< Integration of
Potential Social Impacts
Matla in Urban Areas "
GORDON, C , QESBELL, T F
Rice Univ FIN A-1077
rlsting Literature Concerning
F Transportation of Radioactive
Sandia Labor
SAND7B-7017
itnries ANDERSON, C
00/07/31 IBOpp
0O07310S34 NUREQ/CFi-1337
"Heat Removal Charac teri Btl cs of Vol Heated Dolling Pools
U/Incllned Boundaries "
GREENE, G A , JONES, 0 C , SCHWARI.C E Droolihaven National
Laboratory FIN ft-3oai uNL-NURCG--)! 1 37 80/04/30 179pp
0007310341 NUREQ/cn-ii9a vi
"Design Guidance & Evaluation Methodology for Fued Site
Physical Protection Sys "
BENNETT.H A , OLASCOAQA. M T Sandia Laboratnnes FIN A-1153-9
SAND79-2370/1 BO/07/31 lOOpp Available at NT1S tt7 SO
0007310846 NUREO/CR-1295
"ORNL State Level Electric 1 tij Demand Foretasting Model "
CHERN.U S . DlCK.J W . OAULGHER, C A Dak Ridge National Laboratory
FIN 0-0190-8 ORNL/NUREG-63 BO/07/31 lOOpp Available at HUB
8007310253 NUREG/CR-142B
"Cracking t Relocation of U Dioxide Fuel During Initial
Nuclear Operation "
APPELHANB.A D . MILLER, R N ECS.O Idaho, Inc DAGD JARTSSON. S
Oarmany, Federal Republic of FIN A-6.O41 EQG-2033 BO/03/31
38pp
BQ07310471 NUREG/CR-151H
"Evaluation of Isotope Migration - Land Burial Mater
Chemistry at Commercially Operated Lou Level Radwaste
Disposal BitBBi" quarterly progress rept, Jan-Mar 1900
CZVBCJNSKI.H S , WEISS, A J Brookhaven National Laboratory FIN
A-3045 BNL-NUREG-51S19 00/05/31 30pp Available at NT1S
0007310W4 NUREQ/CR-1477
"Heavy-Bection Steel Technology Program
rept for Jan-Mar 1980
WHITMAN. 0 D , BRYAN, R H Oafc Ridge National Laboratory
ORNL/NUREO/TM-3 BO/07/31 53pp Available at NTI0
quarter!)) progress
FIN D-0119
CORRESPONDENCE WITH OTHER ORGANIZATIONS
0007030054 Advises that IE Qullrtin 80-15. "fossitilp Loss of EmergBnttj
Notificotion Sijr, IENSI W/Loss of Offsite PQUET," us* sent to
listed utils on Q006IB
PAPPAS.H Region ), Chicago Office of thit Director aO/Oh/19
2pp
B007070132 Foruiaida std ordei for DOE wort "Offsite Emergency
Instrumentation for Accidents Involving Light W.iter Nuclear
Poiiier Plants:" foi acceptance
RYAN.R G Office of State Pi i.gr.ims, Director 00/Oi/ia ip
8D07110543 DIICUQ^BE choice of NDS i~ray tocfiTnque5 t, choice oF Ci
valuei L-G should be includvA ai one of Five i-ray
techniques Ci values published in final version of law
should be defensible in court
PLATD.P Michigan, Univ of BO/06/10 3pp
8007140421 Advises that IE Bulletin 60-14, "uegj-fldatmn of DWR Scram
Discharge Vol Cdpability," uas sent to listed utlla on
BOOdla
PAPPASiH Region 3, Chicago, Office of the Director BO/Ofi/13
2pp
B007140597 Advises that IE Bulletin 00-13, "Cracking in Cove Spray
Spargers," uas sent to listed utlls on 000313
PAPPAS.H Region 3, Chicaoo, Office of the Director BO/05/13
3pp
0007150770 AOVISPS lhat IE Info Notice 80-27, "Degradation of Reactor
Coulant Pump Studs, " uiaa sent to listeil utilE on 000611
PAPPAS.H Region 3, Chicago, Office of the Director BO/06/12
2pp
— B0071SQ778 Advises that It Info Notice HO-37, "Degradation of Raattor
Coolant Pump Studs." was transmitted for issuance on BD061I
Notice should be issued to all PUR facilities holding DLs or
CPs Draft Itr encl
MDSELEY.N C Division of Re.ictor Operations Inspections
EO/Ofc/lO 2pp
B007170343 Advises tl>flt IE Urcular 80-14. "Flad loac tl va Con. tarn 1 nation
of Plant DetnineraliiBd Mater Sys t* Resultant Internal
Contamination of Personnel." uas sent to listed utils on
000624
PAPPAB.H Region 3. Chicago. Office of the Director BQ/06/85
4pp
8006120770 Clarifies comments made at ANSI-N951 Steering Committee on
Pumps B00431 meeting In Pi tlsburghj PA re qualification
Issue Functional qualification by experience has merit but
practical verification aspects poie problems Minutes encl
BHOUN.E J Director's Dffico BO/OS/30 flpp
B007210336 Advises that IE Circular 80-13. "Grid Strap Damage in
Mestlnghnuse Fuel Assemb 1 IEC. " uas sent to listed utils an
B0052B
PAPPAS.H Region 3. Chicago, Office of the Director BO/OS/30
spp
E007010013 Foruiards fully oiecutBd sti! order for DOE uiork "ARAC Site
Installations at Nuclear Pouier Plants." issued to LLL
DICKINSON, P Envrgu.Dept of FIN A-0331-0 00/06/10 Ip
— B007010O17 E«ecuted atd order for DOE mark "ARAC Site Installations
• t Nuclear Power Plants." itsucd to LLL
KERR, 0 M Assistant Director for State Agreements Programs *
Energy, Dept gf FIN A-0331-0 8O-BO-OQ6 BO/06/10 Ip
8007010137 Advises that 1C Info Notice BO-E3, "Loss of Suction to
Emirgencu Feediuater Pumps." uiat »ent to listed utils on
000520
PAPPAB.H Region 3, Chicago. Office of the Director 00/OS/3O
2pp
80070102B4 "Looking Out Not Seeing federal Nuclear Patutr Plant Insp
Program "
TVE.L S Union of Concerned Scientists GO/06/30 163pp
0007010607 Advises that IE Circular OO-03, "Protection From Tolic Oas
Haiurds, " wan inadvertently sent ui/o end NUREQ-73/007,
Sections 3 2 1.2 2 S, 3 3. 3 (. i 4 end
CARROLL. D E Region 3, Chicago. DPfice of the Director SO/O4/03
Spp
B007020130 Foruiards fltd order for DOC uork "Offsit* Emergency
Initrumentation for Accidents Involving Light Water Nuclear
Poutr plants, " for acceptance
RYAN.R 0 Office of State Programs. Director SO-BO-oll BO/06/12
—0007020443 Btd order for DOE mork "Offsite Emergency Instrumentation
for Accidents Involving Light Water Nuclear Power Plants,"
Ittued to ID Natl Engineering Lab
RVAN.n 0 Office of State Programs, Director FIN B-1604-0
BQ-19-OB-02 00/0&/12 Ip
8007330261 Advises that IE Info Notice 00-36, "Evaluation of Conlat lor
QA Programs, " uias sent to listed licensees on 80061O
PAPPAB.H Region 3, Chicago, Office of the Director BO/06/12
2PP
800724006D Advises that IE Circular 80-19, "Loss of Reactor Coolant
Pump Cooling & Natural Cii-culntlon Cooldouin. " uas sent to
listed licensees on B00620
PAPPAB.II Region 3, Chicago, Office of the Director BO/OA/34
2pp
0007200079 Ltr tn all pouor reactor applicant* !< Hcensees. rn
Commission memorandum fc order on UCB 780302 petition for
reconsideration of previous memorandum & order dtd 7B0413
EI6ENHUT.D 0 Division at Licensing BO/Oi/25 I Ji
— B0072BOOB4 Memorandum fc order ofPJrming prior decision to deny UCB
requested relief in vieu of add] improvement of fire
safety
CH1LK.S J Office of thp Secretary of the Commission CLI-90-ai
00/09/33 H5pp
8007290104 Advises lliat IE Info Notice BO-2B, "Prompt fieporting of Info
In Accordance U/IOCFR50 S3(e>," uas sent Lo listed utila on
000613
PAPPA<3,H Region 3. Chicago, llffice of the Director BO/C-6/16
2pp
8007290771 Foruiardb summary of 800619 meeting ui/AIT Bubc omml ttee on
Safety Parametei Integration in IlethBada,Ml> re draft
emergency facilities fonctionnl ruquirementa
HINNERB.W Division of Systems Safety BO/07/09 Ip
— 0007H9078H Suminary of BOQ619 meeting u/AIF BubcDinmi ttao nr, Safety
Parameter Integration in Uetliesda.MD re draft eniersBncy
facilities Punc tional rcqui rements
* Division of Systems Safety BO/07/09 7pp
384
NOWDOCKETED ITEMS
B00727O7B1 Request fa
statement of pallia
tay of vff ec t ivenes-s of Corrm L s si on BOD616
guidance for pouer reactor OLs,
it Commission rtrtjoti endorsing MUHEG-
0694 may lie unlawful CertifiiJte of Svt end
WEISS, E Fl Union OF Conteined Biientists LATH/1M.5 D Shoreham
Opponents Coalition WEIS&j I F! Sheldon, Harmon t. Ueias 00/07/23
lipp
— C0072TOBOJ Affidavit stating that currant
coTitra] measured arc not adequnte to in
NUnEO-0694 dnes not lorrect hydrogen to
PTDF qualifications fi\Ll
PDLLARD.H D Union of Lone erned Srient
Nfir regulations re hydrogen
lure health t, safety
itrul tietit le-nci on
— aOO7290BO<? Affidavit re npod to nnaluie sgs. interaction due to
insufficient info for unresolved Safety Issue A-J7
MINOR, G C Short-dam Opponents Coalition GO/07/11 9pp
aOQ7O203O3 Comments on proposed rule IOCFJ15I snould be amended to stats
reactor type fc therraal pouer capacity to <utiic(i regulation
applies f- specifically e I c 1 ud e others
FISHER, £ R General Atomic Co (subs n F Qul F Oil Co > 60/06/05
8OQ702O2I3 Comments on proposed rule 10CFR31 definition of term
"Phusi c-grapJi 1 1 Unit" should1 be in-eluded Penalty for failure
to provide Tintite of intent 3 months In advance •should only
be- 3-month delay in commenc em-ent of review
* LeBoeuf. Lamb, Lelby !. MacRae BO/O6/O9 4pp
BD0702033'6 Comments on proposed rule 10CFR51 proposed penalties for
failure to provide notice of intent within time specified
are Inappropriate Penalties are irrelevant to objectives
stated in introduction b scope
CDQKiJ U Consumers POUOT Co 00/06/09 fip p
CO 0730 COO 5 Requests review of end safety guide re maiiit of nuclear
power plants t)y BOOBH
HDRHISON, W ft A5^iitant Dirpttor tot Genei al Engineering BtanddTds
30/07/10 3pp
— B00730C-007 SG-0"1
"Halnt of Nuclear Pouer Plants," lievision 7
• International Atomic Energu rtgoncy (Austria) 30-SG-O7
79/13/11 53pp
Forwards comments on proposed rule- lOCFf)51 anviron density
should he e.plUitly defined (. Included in aprtmn S NRC has
nn legal requirpine-nt to eipand alternate sites review to
Include safety as HEP A Issue
UHFIIQ.R E Florida Power !< Light Co L-flD-185 BO/06/13 13pp
0007050300 Comments on proponed rule 10CFR20 certification of peraonnol
dosimetnj procusnure Is major step Forward in radiation
protection proararnn. Commends NDC actions
STOCHB.H B Indiana. State of BO/06/03 lp
PROPOSED RULE
800*1 10333 Commonts on proposed rules 10CFR2, 1 9, 20, 21, 3O, 4Q, 31 , 1,0, t,
7O rules are inadequate re pai 1 1 c ipat 1 on of IndlflTi Tribal
govts Failure til involve tribes in initial protest ulll
mult in later practical !< political difficulties
STONE. R J Energy. Dept of 80/03/34 3p p
BD04?(30213 PIP! imin.iry statement in response to CFialrman Ahearne- HOO312
Itr re proposed rulemaking on raduiaste storage t. disposal
SollB raduaate may be fliijosett of u/n rial based on
f undamental earth s-cience processes
• Interior, Eept of., OEologica] Survey 00704/13 llpp
80D5300SB3 Comments an proposed rules 10CFR50 (. 50 10CFR50 72(a ht
should be clarified to permit plant operation pursuant to
Tech Hp-ecs u/n requiring that repts be sent to NF!C
COUNSIL.IJ G Hortheast Nuclear Energy CD (subs of Northeast
Utilities! Bt>/ O5/02 Sff
0006110106 Hemurnndum in support of State of nil motion for 60-day
extension of schedule date* re proposed t-uiemafcing on
raduaete storage '< disposal MRC delay of core bib 1 1 ojraphij
filing uaa not anticipated U/Certi f itate of Svc
MUCHNICKI,E D uhic. State of 00/05/14 lOpp
BOOia7O352 Requests ACItS comments on BECY-flO-OBa re proposed fire
protection rule fur nuclear power facilities operating
prior to 790301
AlU-OTTO.fl A Division of Engineering Gtandards HQ/03/14 lp
BO07O10009 Comments on proposed rul« lOCFRSl agrees u/Air position
that inclusign uf safety mEitters in comparisi on fc ranking
of alternate sites In (JEPA revieu process is not
appropriate
ANDEHSON.T H Uestinghouse blectnc Corp NS-THft-2a9i 00/06/09
2pp
B007010403 CominBTits nn proposed rule 1DCFRS1 utlln should be allowed to
include Busting tLtuc on slates of candidate sltea
Application of proposed change** to etkstlng inventoried or
banked sites is unclear
VflNDENBUnSH, D Yaniee Atomic Eluctrie Co HVC F1O-17 BO/Oh/tn
3pp
SQ07030Q30 lloticp to rociplent! of PR-3O arivisen that CiiminEnt t, uas
miscoded *• utll not be uied again Corrpction notice replacBi
comienl
• Docketing ti Service* Branch BOV03/20 lp
9007020046 Kotito to raclplont? nf PR-20 15FRIBOE3 advises that ComnvHnt
4 U4t miBtodEd t. will not bp used again Correction Bhoulrf
replace rammant
• Docketino Ji Services "ranch 80/05/30 lp
B007020IQO Memo to recipients of commeTits re proposed rules lOCFRSOi
41FR75167 !c 45rR3913 Ustt. commc-nts pppvtomlv filed In
10CFR50, 11FR751&7, now eron-f 1 1 fu u/ IC-CFRBO, 4SFR39I 3,
» Doclieting !, Services Dr.incli BO/06./05 lp
0007030307 Forwards comments on proposed rule 10CFRBO Choice of
mvaEUrenicnt quantities nuct be made by considering practical
limitations t< hiological parameters Processor should be
required to test only For type of radiation produced
DrtTtlOS.E L Yanlee Atomic Electric Co BO/04/22 3pp
8Q0702030B Coirecfcion noticn For recipients nf proposed rule 10CFRHO vt
perForniance testing for persannel dosimstrij Conunent 4
rniEcaded I< will not be used ag,iin Correction notice should
replace Comment •)
» Oocketing Ii Bervices Branch QQY05/3O lp
Q00702031I3 Comments on proposed rule 10CFH20 proco5Bor must bo given
amp 1 D timo !> trial dosimetir exposures to permit callbr of
processing equipmvnt Espressos gratituda for opportunity ta
discuss proposed std ui/ other- in-house dasimetrij proceBtors
JAVIQFISKI.R L Omaha Public Power District BO/O4/30 2pp
8007020315 Fovuarde comments on proposed rule IDCFDSO Item 5 r« cue
protection makes compliance difficult t should be dclettd
Neutron source should be standardised Photon component
should be uell define))
CAULDHELL.F 5 Yankee rttomlc Electric Co RDS 34/BO BO/04/1B
4pp
S007O2O327 Comments on proposed rule 10CFRSO rule must apply to all
the rmn luminescent doBlmetry if user is to be effective
Certification should be matched to monitoring purpose
D Stone & MebalDr Encjlneerinn Corp BO/09/27 3pp
B 0070203 2 9 Comment s on proposed ruloe 1OCFR2O dllcrapancy ttimmlng from
tissue depth at uhich dosDs are recommended to be measured
prohibit fair tt meaningful dosimetrv std Advises of plin* to
attend EC 0423 meating
S, E L Yankee Atomic Ele-ctrlc Co Sa/04/25 4pp
8-007030335 Comments on proposed rule 10CFR20 voluntary program not
effective Ocspt of Health & Environ Science supports
mandatory tostlng ft certification program Health. ei onomic fc
legal considerations demand Jose asseismonts be accurate
LLDYD.C L Montana, State of 00/06/02 3pp
£5057020340 Coiriments on proposed rule 10CFRSO certification of
processors Is not appropriate may of Improving quality of
pnr»onnal doatmotry Arguffients Huggest nead Pnr mare uniform
application of std methodol-ocjij
FAY.C a Wisconsin Electric Power Co SO/O6/Q3 3pp
00070303-! 2 Comments on proposed rule 10CFR51 NRC should carefully
consid&r rtIF common ts, represont inn conEenEUG among utils ti
rtlF
BYEflLEY, T E Oe-orgla Pouer Co BO/06/06 lp
BOO 702034 9 Comments un proposed rule IOCFR20 unjustifiable expense
to regulate radiation exposures uhen 93X are below 1 S5
rem/ijr Voluntary cpmmltmants luoT-king
GERDIpD J AfPilifltior Unknouin BO/Ot/16 2pp
NONDOCKETED ITEMS
385
BQQ7Q2O3S3 Comments on proposed rule IOCFR5O, subml ttod by Logistic;
Enterprises Corp NPRDS does not have substantial incentives
For useful involvement by utllB Sys should be streamlined t,
LER* !. NPRD-46 combined
• Affiliation Unknown P-O192 BO/O6/O5 13pp
B00702Q449 Comment
included to be i)
proposed rule 10CFR21 guidelines should be
n training sessions fat radiation
workers' informing of L ] i ni t.il *< cutulogicfll indicators of
higher than normal risk of sellout health damage
BERTELL,H Ministry of ConLern fci Public Hcaltli 80/05/21 3pp
B007O2Q36B Comments on proposed rule 1QCFR51 Requests 3O~day eitenslon
of comment period Extension would not significantly impact
implementation of regulation since new applications for
•arlg review are not likely to be filed
CRAY, F S Louenstein. Newman, Reis, Aielrad 6 Toll BO/06/O3 Ip
900703Q452 Comments on proposed rule 10CFR20 USP of robots to
routine work at nuclear power plant unuld free human
employees to concentrate attention on tasks that can not be
carried out by machine
ABLER, WL Affiliation Unknoiun BO/06/ OB 2pp
BOO7OS03SB Comments on proposed rule 1QCFHS1 safety & emergency
planning should not be admitted as issues in NEPA
alternative site review Recommends continued use of Reg
Guide 4 7
PEOPLES, D L Commonwealth Edison Co BO/06/O9 4pp
SO07Q204QO Comments on proposed rule 1QCFR31 explicit statements about
critical nature of reactor siting to public safety tt
provision for scoping should be included
HEDEMAN. W H Environmental Protection Agency BO/06/01? Spp
B007020457 Comments on propo;
made as loui as possible
PECK.H Affiliation Unknou
3d rule 10CFR30 c.posur
B007O2O461 Comments on proposed rule 1QCFR20 special cotisldarati
should tf given to eiposure of ernbi i;o. Petus t. minors
Implementation should he Euf f it i ently flenble to alloiii
radiation protection programs to be adapted to situations
STEOuING, 0 E
00/06/09
Army. Dept of, llf f i
General
DASO-PSP-E
PP
flQQ702Q40i> Forwards corrected BO06O6 Itr commenting on proposed ruli
1OCFR51 Original was mailed lu/important sentence
Inadvertently deleted
PATTERSON, J D Middle South Services. Inc BO/06/ 10 Ip
B007020464 Comments on proposed rule 10CFR20 emphasis should be put on
mgt commitment to radiation safety program !. pipcrt
qualifications of radiation safety mgt !c personnel
HALEMAN, G R Yale Univ 80/06/11 2pp
— HQQ7O204I3 Corrects B00606 comments on proposed rule 10CFR31
application to enistlno, inventoried or banked sites is not
clear Status of sites which are part of ongoing review are
not reviewed Endorses A.1F comments
PATTERSON, J D Middle South Services, Inc BO/O6/10 Spp
B007020465 Comments an proposed rule IOCFR51 approves of advertising in
local neuupapers, if all local newspapers BTD includoif
Emergency planning in early site review should include
planning for future population
LEWIS, T1 1 Affiliation Unknown BO/06/09 2pp
BD070SO407 Comments on propoeed rule IOCFRS1 proposed rule should be
clarified re procedures fc subetantive requirements for
alternative site decisions in pending cases
UETTERHAHN, H J Conner, Moore fc Corber SO/06/05 Spp
BOO7020412 Comments on proposed rule 10CFHS1 min requirements for
alternative site analysis on proposed rule will greatly
jisulst applicants in siting nuclear Facilities Variety of
methodologies should be taken into account
REEVES, R W American Electric Power Co , Inc SO/06/06 Spp
QOO7O5D416 Forwards comments on proposed rule 10CFR5I regulations
concerning alternative site review should be coordinated u/
8O0303 proposed regulations concerning EIS
S Sargent h Lundu, Inc GO/06/03 2pp
BOO7O2Oiai Comments on proposed rules 10CFR2 I< 50 regulations In Part
2 slmuld be revised to incorporate proposed retirement
Option B w/mods Part 50 10 should be replaced w/encl
proposed regulation
MILSDN.J N Licensing Branch 1 BO/06/12 4pp
H00702O4B4 Comments on petition for rulemaking B-1O proposed rule could
require Commission to hold unnecessary hearings Ir cause
dalays in approval of proposed licensing action iiihlcfi does
not present significant hazards
QRAY,F S Lowensteln.Nflumaniftels, Atelrad d Toll SO/06/16 3pp
BOO702O43B Comments on proposed rule 10CFR2Q on behalf of Zlmmer Area
Citltens any mat) which exceeds level of radiation found
normally in that matl in natural environ should be
cons lovred as radwaste & disposed of accordingly
FIBSE.L R Affiliation Unknown SO/Qi/13 llpp
BOO7020439 Comments on proposed rule 1QCFR2Q NRC should sponsor
nandatory dosimetry test program for all civilian personnel
doslmetru. processors Advises of inability to attend 800433
neatlng of in-house dosimetry processors
KLDTZ-A B Northeast Utilities NEE-80-RA-236 BO/04/16 Ppp
BD070K0441 Comments on proposed rule 10CFR20 NRC should set performance
ttd such that any processor not meeting std Is prohibited
from performing personnel doslmittry
KLOTZ.A S Northeast Utilities NEE-BO-HA-236 BO/04/16 2pp
BOO7OH0444 Forwards comments on proposed rule IOCFR20 should include
axplanation why linear no-threshold assumption of
offsets selected Consideration should lie given to retaining
current limits for concentrations in air & water
CULVER, J F Air Force, Dept of BO/06/10 4pp
8007030447 Comments on proposed rules 10CFR50 !< 51 Issues In NRC B00313
request for comments are outside DOT field of etpertlse
Supports President Carter 8002 IS program on radwaste mgt
White House press reloaa» & radiuaste mgt program end
ODUDBCHMIDT. N Transportation, Dept of 80/04/07 H9pp
B007020473 Comments on proposed rule IQCFflBl practic.il implementation
appears to fall short of sb.ited objectives Licensee believe)
implementation will impact adversely on siting process
COUNSIL.W 0 Connecticut Yankee Atomic Pouier Co COUNSIL.W Q
Northeast Nuclear Energy Co (subs of Northeast Utilities)
BO/06/09 3pp
8007020596 Comments on proposed rule 10CFR51 second alternative of
e>clusionary safety stdsi ui/inc 1 usi on of safety issues In
alternative site consideration, is preferable Stds will
permit fleiibllity in candidate site proposal
POND.G D Connecticut, Blote of BO/06/11 2pp
Q0070205S5 Comments on proposed rule 10CFR30 !, provides status of fire
protection mods noquests rec onf it (nation of commitment dates
outlined in safety evaluations
SVLV1A,D R Virginia Electric !. Pouer Cu 3341/061479 QO/06/30
Bpp
B007020633 Notifies of issuance nf FEb re pi oposed rulemaking on
storage t< disposal of nuclcrir uiai.te FES transmiltpd to
persons on enc 1 svt list
DROWN.D F Energy, Dspt of BO/06/10 /pp
80O7020639 Submits Prosress Rept 29 for May 1980 re performance testing
for personnel doslmetrg "
PLATD.P Michigan, Univ of NRC-O1-77-19Q NRC-01-77-1BO
BO/06/03 6pp
B 0070 20441 Responds to 8004113 Itr requi'sting opportunity to assemble
group from nuclear industry 01 utils to brief Commission on
proposed emergency planning i egulations Meeting mill be
scheduled in near future u/etjte officials Si public,
CH1LK.B J Office of the Secretary nf the Coromitfiion BO/O6/ 1 1
BO07020663 Responds to 600403 Itr requesting opportunity to assemble
group from nuclear industry OT utils to brief Commission on
proposed emergency planning regulations Meeting will bo
scheduled in near future ui/utate nfficlule !e public
CHIUK,8 J OffiCD of the Secrctdry of the Commission BO/06/11
B 007 030 6 t4 Responds to BOO 40? 1 ti requesting opportunity to assemble
group from nucleai industrij cr ulils to brief CommisBion on
proposed emergency planning legulations Meeting uiill be
scheduled in near future lo/slate officials (. public
CHILK,S J Office Of the Secretary n( the CummissiPn E30/O6/ 1 1
S007O20665 Responds to B004J4 Hi requusliny oppottunity to assombl
group from nuclear industry or utilt to brief Commission on
proposed emergency planniny runul.it inns Meeting will be
scheduled in near future u/itate officials !< public
CHILK.S J Office of the Spctetary nf the Commission 80/06/11
IP
386
NONDOCKETED ITEMS
BGQ7050&&7 Requests oppnr tunitu, to assemblu group finm- nuclear industry
or utils to brief Commission nn proposed emergency planning
reflU 1-iltl On£
KHUTHi D F Kerr-ncBes Chemical Corp (suits of Herr-McGee Corp }
90/O4/24 Ip
Q0070a06iB fiequotts opportunity to assemble group From nuclear industry
or utils. to brief Commission nn proposed emergency planning
regulations
OWEN. H II Duke Power Cn SQ/O'l/Q'? 2pp
BOQ702QA71 Requests -opportunity to aiacmblB group from nuclear industry
or utils to br-ipf Commi sston on proposed emergency planning
regulati on;
KEARNEY, J J EdiBon Electric Institute BO/04/1B Ip
— Q007O30Q9O Requests placement on bvc Hat for generic proceeding on
confidence in storage & disposal of nuclear wastes
DAVIS. J P Consolidated Edison Co of Neui Vork 00/05/06 Ip
— BOQ7O30059 Requests transtnpt of B00139 first general meeting of
participants in proceeding & that Sensible ME Pouier co-
counsel be placed on distribution list for transcript t all
future distributions
MILLER. D S Miller, D 3 BO/03/Ot Ip
BOO7Q300B2 Comments on proposed rule 10CFH51 should not apply to CP
applications docketed before effective date or to related
DL applications Safety issues should not be considered in
alternative site analysis
OFIAY.F S Louienateln.Noiuman.nois.rtielrad S. Toll 80/06/19 3pp
BO0702O&B2 Comments on proposed -rule IOCFR20 neutron testing u/Pu-
berijllium source should bo reinstated For use u/Cf-353
source dosimctry teat Unab I i» to attend Apr meeting of
commercial processors
HOUDEN.H H Radiation Detection Co HQ/04/35 fipp
0D070aOfiB9 Comments on proposed rules IOCFR2. 19, 30. 31, 30. 40, 3J . iO t, 7O
on behalf of Hattuaste flgt Group, consisting of listed utils
NRC underestimates coat of ol tf character! ifltinn Perfection
beinj established as std for siting decisions
S1LBERG, .f E Sham, Pitlman. Potts ti Traubridge BO/03/04 Bpp
9007020695 Forwards comments on proposed rule 10CFR30 neutron source
ihould be stand-ariliied at facility to eliminate problems ui/
dose determination Advises of plans to attend a 004 33
meet! ng
CAULDWELL.FB Yankee Atomic Electric Co RDB-34/00 80/04/1B
3np
BOO702O70I Comments on proposed rule* IOCFF12, 19, 20, SI, 30. 40. 51. 60 & 70
unnecessary to address policy-related issue as to number
of fully charac teri led hiflli level raduaste sites Addl
comments encl
ROBINSON. R V. Eunn Nuclear Co . Inc (subs of Exion Corp )
BO/O2/29 3pp
6007030720 Forwards comments on proposed rule IQCFR5I single ill lay
period of S month* should be applied, regardless up whether
detailed studies have been performed Section 6 S should be
delated
VAN BflUNT.E E Arimna Puhllt Service C-D ANPP-IS63i. BO/06/1S
H0070S0743 Comments on propoaEd Tula 10CFREO sys failing to proviile
satisfactory mBasuroment could still provide aatisfac tory
control Timeliness vital to support requirements of control
Std d-oes not give due credit t-o personnel iJoiimetrij
» Tennessee Vallei; Authority 80/04/33 App
8007020746 Comment! on proposed rule 10CFR20 processor certification
it step In rijht direction d formatiDn of teiting t<
certification lab Is needed Processors need acceis to
specldliied callbr sources Lab must be highly autanomou*
DARTLETT.WT Affiliation UnHnouin BO/Oib/06 3pp
SODT030DOI Comments on proposed rule JOCFH20 Univ of HI testing program
result* demonstrate operational dl Pf icul tl PS In pntolng
penonnel doslmetrij performance lest Passing of std does not
ensure gcrad perionnel doaimetry
JONES.W C Omaha Pulilic Pouor District 0O/06/13 2pp
0007030003 Commentt on proposed rules IOCFR2, 19, 30,31. 30. 40, 31i 60 S. 70
weaknesses arr Further testlmonij ta NRC unuillinsnifoi to
cait aside past prejudices & demonstrate political courage
requisite to succossful geoloaic disposal program
S Sierra Club BO/03/03 Spp
B007030012 Comments nn proposed rule* 10CFRS, 19, 20. 31, 30,40, 31. AO & 70
licensing philosophy based on liest site. best uaste form or
best waste pacfcagp should be avoided Overall «g* approocli
should tin adopted instiad Do tat led comments oriel
JuHNSuN.H T Uoitinghnuae Electric Corp 60/03/23 3pp
B007030021 Comment i on propo«ed rule* 10CFRH. 19, 20. SI, 30, 40, SI. 60 b 70,
submitted M AR ArLheological Survey statement rn timing of
• tate historic jii-eHOrvati on officer review should lie made
In final procedures for radusste dlspoaol
DAV19, H rt Arlcansiis, Btalft of BO/02/2A Ip
9007030045 Request* llstinfl of NM Envirun Evaluation Group at
interested partij tn NRC seneric uaite dUpoial rulemaking
proceeding fieiiomt* receipt of pa*t repti fc fulur* m**tlng
notices, t rvpts
NE1LL.R H New Mo«ico. Stnte of BO/03/13 Ip
HOO703OOQ4 Comments on proposed rule 1OCFR50 NRC should support further
tasting re use of mater eitlngui shing BUS over energiied
eloctricol equipment OSA 1979 limited tost rept encl
MUTTON, J fl Energy, Dept of BO/O6/ 1 1 19pp
HOO7030OB7 Commenti on proposed rule 10CFR2O mandatory program not
justifiad Implementation should be delayed until problems
.are resolved Btd ANSI N13 11 should bo used for test
LEWIS. L Duke Pnuier Co BO/06/11 3pp
0007030075 Comments on proposed rules 10CFRSO & 51 applications not yet
reviewed bij Licensing Board should include Class 9 accidents
in EIS
JOHNSON, C Texas Public Interest Research Group BO/04/30 3pp
OOD7O30904 Conments on proposed rules 10CFH2, 19, 20, 21, 30, 40, 31. 60 b 70
submitted bv CA Energy Resources Conservation & Development
Commission Proposed procedures are significant Improvement
over NRC Nov 197B proposed general statement of policy
VftRANINI.E E , GREW, P C California, State of 80/03/03 3pp
B007030107 Comments on proposed rules tOCFBH. 19, 30, SI, 3D, 40. 9li 60 8. 70
rules are deficient in several key aspects & continue to
reflect passive approach of Commission in dealing u/DOE
program in 197Q general statement of policy
BEfllCK.0 Environmental Policy Institute BO/03/03 3pp
0007030113 Comments on proposed rules 10CFR3, 19, 20, ai, 30, 40, SI- 60 Ic 70
submit teil ftij CT Dept of Environ Protection Provisions should
bo made Pur federal funding to support monitoring program
administered by state after decommissioning
HEUDNER.A T Connecticut, State of BO/02/2B Ip
BO07030H9 Comments on proposed rules 10CFR2, 19, 20, SI , 30, 40, 51, AO t, 70
on belialf of Util Waste Mgt Group & EEI Endorses change in
Commission approach which would eliminate formal step of
provisional const author! lation
AXELRAD.rt Loiuenstein, Newman- Rei s, Aielrad & Toll 80/03/03 9pp
QOO7O30127 Comment a on proposed rules lOCFFtS, 19, 30, 21 , 30, 40, 91, 60 (. 70
major concerns are in areas of site charac teri lation,
consultation !< concurrence u/states !< public participation
Reserves final comments
HftNCOCK.D Southiueit Research and Information Canter BO/OB/2B
2pp
BOO7O3013B Forwards comments on proposed rules 10CFB2, 19, 20, 21. 30, 40.
9>1,6O I, 70 Site cliaracteriiation rept should be made on site
by site bflEia NRC should not be involved in screening of
sites for site charac ter 1 lation
MCCRAY.JO Arnona. Univ of BO/O2/30 2pp
DO07O3O1B3 Comments on proposed rules 1OCFR3. 19, SO, 21, 30, 40, 31, 6O S, 70
Indian tribal govts should be provided adequate opportunity
to participate In licensing process
GABRIEL, E Council of Energy Resource Tribes BO/03/03 &pp
BO07O3O17I Forwards comments on proposed rules 10CFR3, 19. 20. HI. 30, 40,
31, 6O t< 70. submitted by League of Women Voters of US
Mandatory hearings should be required before repository ii
authoriied for const
POWERS; D Affiliation Unknown BQ/03/38 2pp
POO7O3O17? Cmm"ients on proposed rule 10CFR20 derived limits for
concoei tration in air t, water should be retained ti updated to
reflect most current technical data Use of limits for
Intakes would provide addl problem salving flexibility
COPELANtt. R L Energy, Dopt of. Clinch River Breeder Reactor Plant
OO/Ofi/17 3pp
NONDOCKETED ITEMS
387
8007030190 Comments on proposed rule 1OCFR2Q care should be eierciacd
In adopting statements of scientific: advisory bodies
directly Into regulatory framework Adoption of Sys Intl
units will nob make contribution to laymen understanding
ROQEHB.U L 6ulf Oil Corp , Oulf Mineral Resources Co 80706/10
Spp
8007030173 Comments on proposed rules 10CFR2. 19. 20. 21 , 30, 40, 51 , 40 J< 70
supports rBquirements re character i i Ing number of sites in
appropriate media by in situ tests at depth before selection
at repository site & Issuance of license to construct
MENARD, H M Inter i or, Dep t of. Geological Survey 8O/02/39 Spp
B00707006/ Comments nn proposed rule KICFH73 restrictions oil shipment
of moderate stulpgic sininf iLanLP <>NM ui 1 1 significantly
impede commoi cv Faclois influencing delay of conflicting
shipments should be given
FLOUERS.F D General Eleetiii Cn FDil, HO-Bi SO/04/O1 B? p
B0070700B4 Comments nn pinpnseii rules lOf FRB. 19. JO, 21 . 3D. 4Q, 31. 60 t. 7O
supports proposed stpp-by-atep protons for reviewing DOE
development of geologic repositories Hinal regulations
LABH.T H , VUftN.G Natural Besom ccs Defense Council BO/02/39
13pp
BQ07Q302QO Common to on proposed rules 10CFR3, 19, 30, 21, 30, 40, 51, 60 & 70
unclear whether two or more repository sites must be
rejected for each site accepted All US waste generated to
yr 2000 could be accommodated in two natl repositories
FA1RHURBT. C Minnesota. Unlv oF. Minneapolis BO/02/21 2pp
BQ070700B5 Comments nn proposed rules 10CrF!30 !. 35 suggests rewording
to clarify that Mo-99 break through tests mould he required
only for elutions from Mo V9/Tt-99m generator
BROOKS, T R Maryland, Statp of 79/08/31 Ip
8007O30204 Comments on proposed rule 10CFR20 natural radiation is only
one component of environ radiation that also Includes man'
enhanced & man-made radiation Only measurement of particular
area mutt be done in field ui/addl doies bated on findings
HASBERBACH.A E New York Federation for Safe Energy BO-H9
80/06/17, lOpp
— 0007030207 Comments on EPA ORP-S1D 72-1. "Natural Radiation Exposure In
UB> " by DT Oakley no such thing as true measurement of
background radiation. average permissible dose or population
dose Requests that NRC review rapt
HAB8ERBACH.A E Neu York Federation for Safe Energy EPA
ORP-BID-7H BO/04/23 4pp
8007030341 Comments on proposed rule 10CFR73irel terates 790B17 request
that (pent fuel or Irradiated reactor fuel be carried on
special trains NRC & DOT opinions Influenced ICC denial of
restrictions on transport of radwaste
BMITHiR L Consolidated Rail Corp 80/04/11 3pp
9007030343 Comments on proposed rule IQCFR3Q assumptions should be
clearly identified Si be accompanied, where appropriate, by
full explanation of attendant applications, Full definition
of ALAHA should be retained In any revision
BCHERER.A E C-E Power Systems UD-80-033 SQ/Oi/18 5pp
800703034B Comments an proposed rule 10CFR20 Sys Intl units should not
be used In regulatory program unless used as secondary units
h appear In parentheses NRC should provide detailed
procedures for dose dettrmlnation when required
LARBQN.H J Atomic Industrial Forum 80/06/18 lOpp
9007030349 Comments on proponed rule 10CFRBO e*p»rienc« at flr« five
yrs ago demonstrates that 3-h supply of water Is inadequate
Special protective features should include properly designed
8i separated trays ui/ cabling suspended above floor at tray
LEWI8. M 1 Affiliation Unknown BO/09/31 Spp
B00707OO92 Comments on pi oposed iu)e lOCFflBO, qn belialf of Comm Ed major
changes In sys of radiation protection Btdo should only be
made if 'i uhen uiairanted liij neui Info from loafionsible
ac ienti f I c bodi es
BTRELOW.n . ELLIOTT, E [) Lyvy, Outman, Oolrtheig t. Kaplan BO/O6/1B
29pp
B007070112 CommentB on propoied rule 10CFR3O astumptinn of linear dosff
response near icro effcct-jfto dose intercept la
scientifically unoupportab le Morp practical limitationn are
ambient radiation ti natural incidents of biological effect
HODSQN.W L Vet Admin Kn-,p North port. NY BO/O6/I6 3fip
8007070118 Comments un propospd lule lOCFRaO numerical eiposurc
guidfllines should be consistent m/lCRP Publication 36, u;/
dose guidelines of 5 rem/yr frnm eitemal tt internal sources
comb ined
DALE.L F Mississippi Power !i Light Co AECM-30/130 00/06/16
Spp
B007O7O131 Comments on proposed rule 10CFR2O important bo emphnsiie
need to malce ube of neuly available capabilities
represented by Radiation Policy Council
NEY.W R Wntlonal Council on Honiation Protection I, Moa surernen ts
BO/Ob/15 Spp
B00707017") Comments on proposed rule 10CFH20 technical bases for
numerical limits sliould be readily identifiable t primary
considerati un in propuaed stds Highly controversial results
should not be basis for imposing more restrictive limits
CADCNA.D D Bouthuiest Research Institute BO/O6/1A 3pp
B00707017B Comments on proposed rule 10Lf-JJ20 Commission should limit
responsibility to specific Ji substantive regulations t<
refrain from issuing ambiguous ti hlQhly inrerpretati vu
policy statements which matj paralijie advancements in Field
MURPHY, R Medi-PhysicB! Int BO/O6/17 3pp
B0070303S1 Forward! comments on proposed rule 10CFR20 stds should be
consilient w/applicable federal protection guidance & should
Include consideration of work of rncognlied natl t, Intl
advisory organ! lotions,
BATE9.A Affiliation Unknown BO/06/16 Hipp
600707040e! Comments on proposed rule 10CFR20 placing guidance into
regulations that should be plared In rng guides F:
referencing rey guides in i ugulati out ran short circuit
intended review ^ approval prntess
NILBON, R Enon Nuclear Co . Inr tsubs of El ion Corp ) 00/Ofc/lO
2pp
9007030394 Comments on proposed rule 10CFRSO social t< economic factors
ntuit be considered Balance must lie maintained between social
benefits d associated risks Recommends that ALAR A not be
used as numerical guides
ALLMENDINOERiP Affiliation Unknown BO/04/ IB 3pp
BD070704O& Comments on proposed rule IOCIRSO recognition should l>u
given to alternative threshold, nonl Ine.n effect point of
view Assumption of linear dose-effect relationship is not
universally ac Lep ted, except as conservative upper limit
SANDEJIB. C 1 Armstrong Lor k Co HO/06/16 Ip
8007030363 Comments on proposed rules 10CFR30 & SI Class 9 evtnts
should be considered In NEPA reviews for all reactors SECY-
80-131 concluded that NGPA environ reviews should include
analysis op all possible radlolglcal accidents
URIOHT.F 8 Masiachusetts, State of BO/01/22 6pp
B00703Q366 Comments on proposed rule 10CFR20 recognition of differences
In suscBptibili ty to radiation is virtually absent NRC
should halt advancement of nuclear technology until
scientists hava better understand inp of long-term affects
DRAKE, 0 A Affiliation Unknown BO/06/16 Zpp
8007070043 Comment e on proposed ruU 10CFR73 2-dau. notice to delay
scheduled shipment is not adequate to allou shipper to
modify plan* NRC should notify shipper within 24-h of
receiving 7-d»y notice from shipper
MANOUSI.J Transnuelaar. Inc 80/02/28 Ip,
B007070063 Comments on proposed rul» 10CFRHO licensee has no concerns
w/requlreit repnrtino of dose* lo public from fuel cycle,
Implementation of discharge limits for Kr-B5 t. 1-129 In 1983
thould be clarified
LEHIB.U DukB Power Co BO/04/IB lp-
BD070704O7 Comments on proposed rule lOCTOEO prupueod personnel rsvieu
of numerical dnce limits foi Internal l< eiternal eiposures
in combination appears to til' unnotessary Use of englnserlntJ
controls has resulted In nu significant detectable burdens
VANDENOUROH. D C Yankee Atomic Eluctric CD HYC tlQ-IB GO/06/13
2pp
B0070B0009 Btiitement of position on proposed rulemak mp re utoraflB !<
disposal of raduaste Urges uerioua studij uf nnn technical
criteria t< requirement that i onsultiitl on ti concurrence
procedure be consolidated in W states W/Crjrti f irate of Bvc
ANDALMAN.E Ml ssi ssippians Against Disposal HO/OA/29 6pp
H0070BO26V Foruards Scientists t< EngnipeiR for tieciiro Ener(|ij statement
of position re storage t< disposal of nuclear waste To
ensure uaste riisposa] facilities mill eilst uihan noeitcif,
demonstration projects should be begun immediately
RICHARDS, JR Capital Legal Foundation BO/0//01 EGpp
338
NONDOCKETED ITEMS
B0070BO34? Comments on propped rule 10CFH20 on behalf of util
Occupational Radiation Std s. Group licensee should establish
specific procedures, tP implement emergency octupatl ortsl
eipoEure^ w/e i p usur-e limite-d to nne time only ficpts enc I
G/1LLO, J Ishdm, Lincoln & Re-ale an/Q6/lS 13pp
Q007 100034 Cnrainents on proposed rules IOCFR3, 19, 20, 21 , 30. 40, 51, 60 Si 70
proposed prelicsnaing process Introduces unnecessary d
redundant element1) into otherwise sound program for geologic
investigations & determinations of site suitability
MEVERS. 8 Eneigy.Dept of 60/O3/03 lOpp
BO070Q0333 'ftediat>un Cani
b logrophy (lit !
GOLDMAN, rt California.
ls !i Linear Hypothesis " Brief authi
of, Davis BO/06/18 17pp
— B007Q80357 "Practical Threshold For Radiation "
WHIPPLE.SH Michigan, (fnw of BO/Ofi/10 12pp
— S007OB036Q) Memorandum of discrimination issues raised by special
occupational radiation eiposure stds foT utomcn
F Isham. Lincoln f, Deale BO/06/ia 19pp
8007090040 Comments on proposed rule 10CFR20 requests that name b
added to mail 1113 list In connection u/rul email ing procedure
STENSVrtAQ. J M Vanderhilt Un I * 90/06/IB Ip
a007090O9Q Fc-iuarUs BOO914 errata to 800415 statement DP position re
proposed roles 10CFR30 !' 51 5vc list encl
HROHN.OF Energy. Dept af HO/05/19 6pp
8007100030 Comments cin proposed rule 10CFR20 provision Dhould bo made
for rational disposal of small activities oF radionuc 1 Ides
used in diagnostic nuclear medicine procedures Situation ii
presently chaotic
EVAN9.R D Massachusetts Institute of Technology 8O/06/16 flpp
0007100039 Comments on proposed rule 10CFR3O suggests eitondinfl 30-day
reporting requirements to 6O days following month during
uhich radiation levels or radioactive matl releases were in
eicess of limits
COUNSIL.U B , LEE. U F Connecticut Yanlee Atomic Power Co
COUNSIL,H Q Northeast Nuclear Energy Co (subs of Northeast
Utilities) BlOOOt 00/03/29 3pp
0007100046 Comments on proposed rule 10CFR73 regulation should indicati
hoy NRC will obtain relevant Info t< uhat factors mill
Influence decision on which shippers !i consignees will be
delayed
HDQANiJ P General Atomic Co (subs oP Qulf Dll Co ) SO/O3/04
2pp
— 8O07090103 Errata to BOQ419 statement of position reproposfid rules
10CFHSO A 51
* Energy. Dept of DOE/NR-0007 80/05/14 inp
S007100047 Forwards util statement of position re proponed rulomaklng
on storage !i disposal of raduaste
SftNQER.H B Tennesoee Valley Authority BO/07/07 Ip
60070901)3 Forwards tarrectad Pages 3.7 J, 10 to BOOS29 cammenta on
proposed rule& lOfFRS, 11, 3Q,2\, 30, 40. 51, 60 & 70
JONES, K rt Natural Resources Defense Council US SO 901-1
eo/O3/03 4pp
8007090 14S Comments on proposed rules 10CFR50 d 51 although decision
to defer commercial reprocessing in US was hated primarily
on economic considerations-, delay uas also intended to
encourage other countries to consider deferral
KEENV. B M Unknown Affiliation BO/04/H 4pp
— BQQ7QC)Q148 Comments an proposed rules 10CFRSO !, 51 supports conclusions
of 1-nteragencu, Review Group on Nuclear Waste Mgt in
Mar 1979 reft to President
SPETHiO Council on Environmental duality 80/04/15 9po
— BQ07100050 Statement of position re proposed rulemakina on storage fc
disposal of raduaste Spent fuel may be stored safely ontltc
!< oFfaite based on available & emerging suitable tschnolDBiJ
SANGERiH 5 , BURGER, J F . BUST10N. R R Tennessee Vallfy Authority
BO/07/07 13pp
— 8007100054 "Spent Fuel Mflt Prograni Study Summary Repti
Certificate of Svc encl
» Tennessee Valley Authority 77/09/30 36pp,
Sept 1979
8007100079 Comments on proposed rules 10 CFR 2,30,40.50.51,70 & 110
rules do not indicate procedures For identification,
evaluation & protection of historical ti/or archaeol og teal
properties which may be affected by NRC licensing
D1NCAUZE, D F Massachusetts, Univ of EJO/04/07 Ip
BOO7O90399 Comments on proposed rule 10CFRSO urges that NR.C Vieui lou
level Isotopes used in medicine uiith context b not
d-Blay promulgation of appiapnate requirements for disposal
until problems of reactor waste disposal can be solved
LIMTON.OW Affiliation Unknown QO/Oi/lB 3pp
60071000B3 Comments on proposed rule 10CFR20 terminolagu uxed to
• ipress amount of radiation Si degree oP e>posure should be
uniform d made clear for lay people Specific moan* for
obtaining other etposure info should be provided
PRITCHARD, 0 C Interior, Dept of, Bureau of Mince BO/06/13 &pp
0007090103 Comments on proposed rula 10CFR19 success of conferences
is largely due to informal nature uhich allouis candid
diicussion betuo-en NRC Ji licensee mgt Proposed rule is
unnecessarij & luctuld intrude on mgt responsibility
PARKER. H 0 Dute Poiuer Co BO/06/04 2pp
G007100001 Comments on proposed rule 10CFR30 changes aught to be made
aj\lij when overwhelmingly re-quired Major reurite.as
proposed. mould be counterproductive to purpose of radiation
protection
BRITIB.J 8 Health PhUslcH Society HO/04/13 3pp
8007100005 Forwards comments on proposed rule 10CFR90 rule is very
vague & does not fullij identify specific fire protection as
intended Impleaentatinn deadlines are unrealistic }. should
ba re-evaluated Propased rule encl
CIBUS.D C Middle South Services, Jnc BO/06/13 13pp
B0071O0007 Comments on proposed rule 10CFREO anything beyond
performance slrl based on objectives of acquiring Info
through measurBment unulri be unduly restrictive Regulations
shoulf be written In terms meaningful For implementation
ZEtACiR E Temple Univ BO/06/11 2pp
3007100013 Comment* on proposed rules 10CFR2, 19, 20. Si, 30, 40, 91, 60 J. 70
technical criteria should be established to limit relnaies
bo biosphere to less than is now legally acceptable
MASON: D 0 RotKuell Inter nn tional Corp , Atomics International Oiv
S0071000I7 Comments on proposed rule 10CFR20 any changes from
c nneentratl ons to annual intake limits must be carefully
uiortfei! to ensure aga ft sen differences are uell understood
111 public Clear instrument calibi info should be Included
W1NAN6, L F Oregon. State of BO/06/10 4pp
80071000B6 Comments on proposed rule 1OCFR20 San Diego County concur*
ui/reporting requirements Reporting process should be linked
to local govt which mould respond to emergency situation
HONDEHCER.n F California. State of BO/06/17 Ip
0007100070 Comments on proposed rule 10CFR14O discusses effects oP
THI-2 accident on physical & mental health of family & local
citiiens Disagrees u/Saltiman statement that determination
of damages would be difficult under present regulationo
KDSE9.V R Affiliation Unknown SO/Ot/18 3pp
S007100093 Comments on proposed rule 10CFR20 requests combination of
code requirements For dose b radioactive release to
eliminate duplicate regulations l< redundant reporting
Literal enforcement of code would be costly b redundant
HOFFMAN. D P Consumers Power Co BO/O6/12 2pp
3007100094 Comments on proposed rule 1QCFR73 clarifies BOOS1Z Itr re
DOE license-exempt shipments for matl oF law strategic
significance Rewording mas not intended to suggest NRC has
authority to order DOE shipper actions
UEI8Z.G Energy. Dept oF BO/O3/05 2pp
BQ07100104 Comments on proposed rule 10CFR70 clarification of
intentions re (oMU is essential u/respect to carrier
obligations & growing number of states seeking to regulate
transportation of radioactive matls
JORDAN. A G Affiliation Unknown 5O4B611 SO/06/ IE 3pp
B0071O0160 Forwards summary statement of position of Util Nuclear Waste
Mgt Group ti EE1, "Capability For Disposing Of High-Level
Wastes Safely." "Long-Term Safety of Nuclear Waste Disposal"
It "Capability for Baft? Interim Storage of Fuel "
AXELROD.M LouienBtein. Newman, Reis.Aielrad J, Toll BO/07/07 7pp
NONDOCKETED ITEMS
389
-B0071O018Q Summary statement of position of Util Nuclear Waste Mgt
Group <* EEI Spent nuclear fuel from licensed facilities can
be disposed of in spFe !• environmental ly acceptable manner
« Edison Electric Institute * Louenstein. Newman, Deis, Aielrad t,
Toll BO/07/07 32pp
9007110031 forwards Lomments on pi oposed rules IQCFH2. 19. HO, SI , 3O. Id.
91. 60 !, 70 NBC responsibility in determining 1 i conseab i Htij
should be flased solely on whether particuldr site meets
UIGQIN.EA Atomic Industi lal Ftiruin BO/03/06 1pp
— BOQ71OQ184 "Capability For Disposing of High Level Wastes Safely "
« Nuclear Safety Associates BO/O7/07 libOop
— 80O71OO18B TR-3193-1
"Long Term Safety of Nuclear Waste Disposal Basis for
Confidence "
BARTLETT.O U . OSTQN, S G . GIUFFftE.M 9 Affiliation Unknown
80/07/07 lOOpp
— 3007100191 "Capability for Safe Interim Storage of Spent Fuel "
LAMBEP.T.R Oeneral Electric Co HALEY, 0 Hestinghouse Electric
Corp SILBERG, J E Shauu Pittman. Potts It Trowbndge BO/07/O7
33pp
80071 002-1 & Statement of position re proposed rule/Dating on storage t.
disposal of raduaste Urges that reliable date be set by
which repository syt will be in operation Adequate storage
guarantee must be commensurate ui/life of plant
BROWN, W J . MUCHNICKI.E D Ohio, State of BO/07/O7 2ipp
(J0071Q024B Statement of position re proposed rulemalting on storage 8.
disposal of raduaste Urges eiclusion of consideration of
off»ite disposal & attended onsite storage From Individual
licensing proceedings
» Atomic Industrial Forum 80/07/O7 S9pp
6007100234 Forwards ANS statement of position re proposed rulemaking on
nuclear uamte storage tt disposal
MaNBDlB9E.H M American Nuclear Society MaNBOIBSS, R M Pacific
Legal Foundation BO/07/03 lp
— 8007100257 Statement of position of ANS proposing that NRC reach
finding of confidence re safe nuclear waste storage tt
disposal u/o danger to man or environ
MONBDISBE.R M . ZUMDRUN, H A American NucUar Society
MQNBDISQE.R M Pacific Legal Foundation BO/07/03 3Bpp
8007100327 Notifies that OF Ahearne concurs in uording of fire
protection rule. BECV-QO-OBB. as revised bg J Parry B00317
nemo subj to listed changes
SAUTER.O Commission SO/04/ 16 lp
B00711O048 Statement of position re proposed rulemaking on storage fc
disposal of railuasle Historical eiperionce offers no basis
for confidence in DDE or nuilejr inrtiistry ability to achieve
goals ti does not justify long-term (iro jec tiorvs
JDrtDAN.U 6 , BHHOP.L U Neiu Lnglanil Coalition oil Nuclear Pollution
JORDAN. W S Sheldon, Haimnn S. Weiss HO/07/07 L79pp
8007110056 Comments on proposed rule 10CFR50 requflats that Itr !<
attachments be read Into record as testimony uhen Commission
considers proposed rule on emergency planning Regulations
for planning should only address needed capabilites
COX. F T Teias. State of UO/OV2B 7pp
B00711O067 Statement of position re proposed rulemaking on storage *
disposal of radunsto Any alternative For raduiastp disposal
in geologic dn>pQ3rtl site mill be unacceptable due to
unpredictable consequences Certificate of Svc encl
LOCHSTET.H A Affiliation Unknown 80/O7/03 6op
OOO71I0087 Statement of position re proposed rulemsking on storage ft
disposal of radiuaste Declines to state present- comments but
reserves right to offer cross -ntatenents uihen appropriate
HILSOH.fi P South Carolina, btatc of BO/O7/03 lp
B00711010I Statement of position re proposed rulemaking on storage &
disposdl of raduastc Deep geologic disposal uncertainties
require further evaluation Disagreements betupen levels of
govt must be solved DOE must provide assurance r" schedule
GRIFFIN. U . DIAMOND. M J Vermont. State of BO/07/0! 3pp
8007110121 Statement of position re proposed rulemaking on storage %
disposal of rddurasto Urges imposition of moratorium on new
nuclear plants until technical t< institutional problems are
resolved Factual gaps !< knoun problems still present
ACRAMS.D , CCRW1N, J U . 01AL1K.E 1 Neui York. State of 80/07/07
8007 110 32 S Comments on proposed rules IOCFR70 tc 73 application 0-f ru 1 a
to nonpouer reactors mill have devastating efPect on
research reactors (v associatpd education I( research
activities carried on at oniv research reactors
WILSDM,H E Washington State Univ 79/10/OB 13po
— 8007100334 Foruiards draft memo summariiing individual Commissioner
comments on 8ECY-8Q-OBB. f ire protection actions Requests
comments or concurrence in time to affirm paper on 900319
Draft memo. mod i f led pages & draft Ffi notice encl
PARRV.S J B Office of the Secretary of the Commission BO/03/17
t7pp
80071003SH "Spent Fuel Mgt Program Study Summary Rept "
DAVIDSON, R H , MOEGLING. J D Tennessee Valley Authority 79/09/30
30pp
--B0071I0331 Foriuards comments on proposed rules 10CFR7O fc 73 faciliti)
uil! be shut dOLin rather than incur costs for upgrade
Faculty/staff positions ull) be eliminated
WILSON, W E Washington State Unlv 71/OQ/3O 3pp
--BOQ7110239 Foriuards comments on proposed rules 10CFH7O i 73 no detailed
impact statement or cost-benefit analysis is available to
predict effects of proposed rulemafcing on US educational
sus
WILSON. W £ Washington State Unlv 79/OS/30 3pp
B00710D348 Comments on proposed rule 10CFR20 items should bi added to
provide for Involvement of uorkers % representatives in
auditing h controlling enposuree S< to provide for worker
acoit to medical t< exposure records
HICKS, M M Utility Workers Union of America BO/06/ 16 4pp
0007100352 Comment* on proposed rule 10CFH60 comparative evaluationn
of alternate uaste forms for every repository are not
justified DOE should specify allowable waste Forms. or set
specs
MCELMUHHY. 0 R Affiliation Unknown DO/O6/13 2pp
B00711O003 Formards HR Lund 800324 Itr re Commission proposed rule on
emergency planning Requests comments on concerns that rule
Is overbroad for medical licensees
BIHPBDN, A K Senate. Judiciary Committee 80/05/OB Spp
B007110019 Comment* on proposed rule) 10CFR2. 19i SO. 31. 30. 40, Si. 60 tt 70
site characteriiatlon rept should include discussion of
mineral resource conflicts. geologic conditions below
repository lave! l< regional geologic conditions
HANCOCKrD / HECTOR. A 0 Gnuthurest Research and Information Center
SO/03/03 '4pp
B007110026 Comment* on proposed rule* lOCFRHi 19. 20, 21, 30, 40i SI, 60 fc 70
•it* accBptabllty criteria should be defined to avoid
ambiguity Si to assure proper 'attention d informed decisions
•t each critical step of investigation
HEDEMAN. W N Environmental Protection Agencu, BO/03/07 Spp
B007110242 Advises that RT Kennedy concurs in changes to BECV-BO-08B,
fire protection rul e. proposed in 0 Bouter G00416 memo.subj
to attached revisions
QUILuEFtT.J Commission BO/04/17 4pp
— B007110246 Notifies that JM Hendrie concurs u/B0041b version c,P fire
protection rule circulated by 0 Banter as modified by RT
Kennedy
FONTECILLA.H Commission GO/04/ IB lp
8007110257 Foruaids WI rtd Hor Radioactive Histe Disposal CnmmJttee
comments on proposed rules ItK FR3. 11, S(\, HI. 30i 40. 51. 60 !< 7O
app 1 ication. i-nvi ron rept t< amends shall be Filed u/of f ictal 5
designated by governor State of HI '90727 Itr to DDE enct
HALSTBAD.R -J Wisconsin, Statu of BO/O6/04 19pp
8007110343 statement of position re proponed rulematina on storage &
disposal of raduaste Joins in Neu England Coalition on
Nuclear Pollution t< NRDC statements of poiition W/
certification of svc
MILLEfi.D B Sensible Maine Poiuer MIU.EH. D S HiUsr.D B
BO/07/07 lp
B0071J047S Comments on proposed rule IDCrRSO Nf!C shuuJd draft NURE&
rept to accompany regulation mtutli details tachnica] baiie
for numerical limits & quantitative requirement 9 in revised
rule
TAYLOR. J J Wcstinghouse Electric Corp WRO-1097 BO/06/IH 23nn
390
NONDOCKETED ITEMS
B0071 104^6 Requests Commission approval tc publish, For comment. amend to
IOCFR50 in form of App R.u'fire protection requirements for
plants in operation prior to 790101 Amend mould facilitate
implementing DTP 9 5-1
FONTECILLft.H M Cammi ssion BO/03/ 1 4 2pp
BQ0711Q497 Comments on proposed rule 10CFR20 party other than operating
util should fie responsible far man it or ing all radioactive
releases from nuclear plants
STAMIR16.D Affiliation Unknown 80/06/17 Ip
B007110S04 Discusses status of App R to IQCFR50 re impact of requiring
all fire protection features installed by BO) 101 Eleven
plants will not complete Section 3 I mods t. Section 3 2
open items by B01I01
LAIHAS.C Plant Systems Blanch SO/04/11 3pp
BOO7I10307 Forwards comments on proposed rule 10CFR51 from RC Pevear of
WH State Legislature
DURKIN.JA Senate 80/06/19 Ip
B007H0049 ForiuardE statemont of position re proposed rlilemali ing on
storage & disposal of radwaste
O'DONNEi-Li A •> Bechtel Corp BO/07/03 Ip
— B007140047 statnment of position re proposed rulemaHng on itoraga t,
disposal of radwaste Radioactive ujaute can be safolg
disposed of in mined geologic reposi tury, in basalt & nrnnitt
chambers & in different host media
t Bechtel Corp BO/O7/03 6pp
B007J4009i Comments on proposed rule IQCFR20 single agency should ti*vi
responsibility for radiation related matters Ftec ord* eop ing
requirements should be streamlined
COLi-IER,RE Affliction Unknown BO/Oi/13 2PP
8007140277 Responds to FOIA request fur all info which directed or
discussed ang changes of proposed fire protection rule in
SECY-BO-OBB App documents have been forwarded J Oulbert
B00311 memo withheld Iref F01A Eiemption 5)
FELTDN.J M Division of Rules and Recnids 00/06/26 2pp
9OO7 110334 Comments on proposed rule 1CCFR2D add I reporting
requirements should tie initiated only if uell defined
benefit is to be derived
fiEHTH.G E Mallinrkrodt, Inc 80/06/18 3pp
— B007140291 Staff requirement memo ro S00433 open Affirmation Srnlon
BQ-!B in Washington, DC Includes overall records of
Commission votes re SECY 00-166, SECV 00-177 fc 9ECY-BO-OOQ
CHILK-S J Office of the Secretary of the CommlBBion BO/03/O1
3007110347 Describes status of alternate/dedicated shutdnun Bys as of
800328
CAEE.E Office of Nuclear Reactor Regulation. Director BO/07/10
2np
U0071 10553 Motion to produce documents forthwith t< extend date far
luhmitting comments on proposed rule 10CFR30 until at least
3D (lags following date info requested in KMC Inc 1980 FnIA
request is made available
CONNER. T D KMC, Inc 80/06/24 9pp
BOO71103B6 Forwards info requested by JF AhearnB re status of fire
protection review program. al ternate/dedicated shutdown sys
status as of B00331 t, other outstanding Issues
LAINAS.G Assistant Director for Safety Assessment BO/04/02 7pp
BQ07140002 Statement c-f position re proposed rulemalilng on storagB J>
diiposal of raduaste Complete Eel of acceptability criteria
mag not be possible due to lack of successful site studies
Detailed tests needed far actual site risk assessment
» Interior, Dept of. Geological Survey 80/07/07 38pp
BO07140011 Statement of position re proposed rulemaUng on storage i
disposal of rdduaste NRC should find that no conclusion* can
b» draun as tn uihether or not spent fuel can be laPely
stored until permanent disposal sites are available
SENCEHAL.M £ . OLSON, J F , SPANNAU5. H Minneiota, State of
80/07/03 9pp
— BOO7140014 Comments re proposed rulemaUng on storage !< disposal of
radwaste No scientific bacis may be advanced for safe 40-yr
spent fuel storage
ABRAHAMSDN, D Minnesota. Univ of, Minneapolis 8O/07/02 40pp
SOO7110036 Btatement of position re proposed ruleraalnno on storage t
disposal of raduaste Urjes establishment of positive
finding of confidence Notes evidence of demonstrated uaste
«.gt technolosy re potential toiicity !c full-core discharge
CHAMEH.EM neighbors for the Environment 80/07/04 3pp
— B00714Q040 "Demonstrated Technology Three Eiamples From Hutorg &
Analysis of Nuclear Uaste Mgt. " by JD Has. of Marveij Mudd
College of Engineer-ins & Technology in Claremont, CA
FWE. J D Affiliation Untnoun 77/07/OB 33pp
— B007140297 Discusses fire protection rule proposed in 5ECY-HO-QBH Liitl
JF Ahoarne recommendations re provisions which should be
incorporated in rule Includes info re public comment
peripd !< implementation of nonshutdown sys mods
SAUTER.O Commission SO/04/ 10 Ip
— B007140303 Discusses fire protection rule propound in 8ECY-SQ-OOB
Commission affirmed, u/commonts, proposed fire protection rule
delineating certain mln fire protection niiulrementa at
B00423 Affirmation Session 00-13 Lists recommended ch*nfl«i
^fOTLEy.DP Engitieerinn MetNqlology Standards Branch BO/06/03,
2pp
8007140336 FQIA request for all info uhich directed or dlicuiied inu
changes to proposed fire protection rule in BECY-BO-ODB fc
record of Comimssion's vote re change*
KNUTH,D F Kerr-McOee Chemical Corp (sub* of Kerr-McO«e Corp )
BO/OS/30 Ip
80071403B7 Statement Df position on proposed raduaste itorap> d
disposal rulemaking No aspect of DDE program provide*
reasonable assurance reliable offslte uaste diipoial But
uill be available before current nuclear licenses expire
SHELDON.K P Natural Resources Defense Council SHELDON. K, P
Bhelrfon, Harmon t< Weiss BO/07/07 95pp
B0071404DS Comments on DOE position re proposed raduiast* dliposal b
storage rulemaking Technical Facts inadequately addrteioil or
improperly interpreted DOE defense in depth approach not a>
strong as poaition paper purports
MUDREY.M 0 Wisconsin, State nf 00/07/10 13pp
— B00714040B Comment* on DDE B0041S statement of position re proposvd
raduaste disposal d storage rulemaklng Transportation
impacts through reliance on railroad* could si gnl f icantlg
adi to consumer cost
LEVERANCE.J Wisconsin. State of SO/O7/07 9pp
— H007H04I7 Testimony re DPE statement of position re proposed raduaitt-
storage & disposal rulemaking DDE position doai not dtal
adequatelg uj/soc lal, pol i ti cat & institutional aspects of
rarfwaste mgt ML Symon B00305 1 tr to RW Rtleg end
KEULV.J E Wisconsin, State oP BO/07/1O 31pp
— 800)7140046 1SBM 0-99448-106-1
Evaluating Hazards of Duposing of Wastes from Energy
Production," Bureau of Radiation Protection, Warn sburg, PA
Presented as part of ANS B00227-39 topical meeting re
tfrchnica! assessment pf nuclear power fc alternative
DORNSIFE-W P American Nuclear Bncletv DORNSIFE.H P
Pennsylvania. State of BO/oa/29 19pp
— 8007I400S1 1 D 77-11-07
"Relative Spent F'uel Storage Haiardi " preparetf for AN9
winter fleeting in San Francisco. CA
STWAHL.J F HUS Coi-p DRQBNAN, D F Los Angeles, CA CRAMER, E N
Southern California Ednon Co 77/11/30 EBpp
8007140043 Statement of position re proposed rulemaking on storage &
dlipmal of radwastt Urges determination re recycling
technique *i location Interim aiuay-frum-reactor aites should
be avoided Geological survey list of publications end
MACARTOR, J D Delaware, State of BO/O7/03 SOpp
BQ07140'133 Forward* statement of position re proposed rulemaklng. on
storage t< disposal of raduiasta Requests addition of MJ
Murrag k removal of D Hanaell !. S Bekuler from ivc list
MUfJRAY.M 0 Illinois, State of BO/07/07 Ip
— B007I40439 Statement of position re proposed rul emak ing on storafle i<
disposal of raduiaste DOE conclusions that uaite packaging
methods ui 1 1 be developed when need arises are meanlnglet*
due to insufficient data tr technical uncertainties
MURRAY.M J , SCOTT.W J . VRANKEN, J V lllinoi*, Statl of
BO/07/07 3pp
—8007140449 Affidavit stating that DOE position ri waste packaging mutl*
is misleading DOE statements re interim spent fuel itorag*
inadequate W/bib 1 iographg It proof of svc
RDY,R Illuioit, State of ROY. R Penntglvania State Univ
BO/07/03 Bpp
NONDOCKETED ITEMS
391
B00714O454 Comments pn proposed rules 1QCFR2 & 50 prefers current
regulations rather than proposed options A-D which would
prolong licensing schedule u/o assuring timely decisions
ROBINSON, M J Black t, Veatch BO/06/16 2pp
9007140460 Forward a comments on proposed rule 10CFR50 rule Is vague &
unenforceable Updating Busting reg guides rather than
implementation of App B would better serve safety, fire
protection b financial interest of consumer
DIMJAN.K M Affiliation Unknown BO/06/19 6pp
B00714033B Comments an proposed rules lOCFftH, 19, 20, 21, 30. 40, SI. 6O l< 70
State DF HI Ad Hoc Radioactive Waste Disposal Committee
agrees u/rulemak ing rationale Supports decision to withdraw
proposed Nov 197B general statement of policy
HALBTAD, R J Wisconsin- State of 00/03/27 2pp
B007140343 Comments on proposed rules 1OCFR20 b 50 disagrees w/
Immediate effectiveness requirement for significant fc
nonsignificant events
HOFFMAN, D P Consumers Power Co 80/09/39 5pp
B007140349 Comment! on proposed rule 1OCFRI"? 10CFR19 14(h)jas proposed,
not necessary ft language used does not explicitly define
public accBti or Individuals ui/legi timate interests
Informal conferences in/licensee mgt uould be beneficial
BAODEN, 0 Western Nuclear. Inc (subs of Phelps Dodge Corp >
BO/04/2B 2pp
B007140539 Comments on proposed rules 10CFR20 & SO consolidated
reporting requirement list should be developed & obsolete &
repetitious requirements should be cancelled Addl burden
could distract plant operators
FAViC H Wisconsin Electric Pouer Co BO/06/04 3pp
8007140564 Comments on proposed rule 10CFRSO commends NRC action bo
have NflC certified lab u/contlnual monitoring by ND3
BTEIN, E L Delaware, Btate of 80/03/29 if
6007 140 37 S Comments on proposed rules 10CFR2 & SO favors proposed rule
change to 10CFH2 103, 10CFR30 5B & 1OCFR30 91 NRC capable of
determining significant hazard considerations t< 30-day wait
before amend issuance unnecessary
DALE, L F Mississippi Pouer & Light Co BO/05/HB lp
BQ071403B2 Comment* on proposed rule 10CFR20 proposes that manufacturer
be tested t> certified before TLD clips are allowed on
market- eliminating film processing problem!
MALEK.F A Oulf Nuclear, Inc BO/05/H9 lp
8007130046 Corrects Comment 3 which was miscoded in rulEmaHnj
Requests placement at corrected notice in file
* Docketing & Services Branch SO/06/30 lp
B007130f)51 Corrects Comment 19 luhirh was miscoded in rulemaling
Requests placement of corrected notice in file
* Docketing t, Services Branch BO/06/3Q lp
B0071S0067 Comments on proposed rule 10CFR2O Items B 141 ii C (31 should
contain rof to EDI! concentration stds !i Ite-m D <7> should
also include effluent monitoring
DEBOER.T K lieu, Vork, State of HO/06/1B Ip
BOO715006B Comments on proposed rule 10CFR91 Dffpt of Natural Resources
supports requirement that applicants provide notice of
intent to tender application for CP J months prior to
submlttal Reduces duplication !< insures coordination
* Oeorgia, State nf 90/06/27 2np
BQ07130070 Comments on proposed rule 10CFH20 cost/benefit Bnuatlon o-f
added certification regulation should be considered
Certification does not guarantee improvement Testing labs
should be established by processors tt not under NFTC control
LINTON.O M Affiliation Unknown BO/06/2A lp
8007150073 Comments on proposed rule IOCFR30 program will be large
expense for limited benefit Testing is over emphas i i ed
Requirements for processors should begin ui/c ommit lee of
experienced experts
JONES.D E Affiliation Unknown BO/06/24 4pp
B0071S0077 Comments on proposed rule 1QCFRSO supports mandatory
processor certification process, certification by category,
establishment of certi Fication board (( change In beta
eiposure testing process
DEHART. R H Air Force. Dept of B0/06/2fi 3pp
B0071500BO Comments on proposed rule 10CFRBO testing program maij cauin
processors to design dosimeter merely to past test Program
must evaluate processor in Intangible areas Accuracy
requirements are overly restrictive
JACKSON, P 0 Army. Pep t of BO/Ot/23 3pp
B0071SOOB4 Comments on proposeif rule 10CFR20 HRC program should permit
integration u/sitnilar Federal d state programs All elements
of certification program should be available to all
processors & implementing agencies
VILLFORTH.J C HEU.Dept of. US Public Health Service BO/O6/H7
2pp
8007140391 Comment* on proposed rule 1OCFR2O personnel doslmetry
problem might be helped by periodic insp of personnel t.
Facilities & personnel monitoring establishments
Standard i lation lab could result In greater errors
NURNDERQER.C E Affiliation Unknown BO/05/ 19 Spp
B0071300B9 Comments on proposed rule 10CFR50 objects to requirement! of
Bubpart P to proposed App R Ha reasonable bails eilsta For
requiring either reactor coolant pump fire suppression ay»
or lube all components to withstand BSE
VAN DRUNT.E E Ariiona Public Service Co BO/06/30 lp
8007140399 Comments on proposed rulo 10CFRBO supports NRC position that
certification lab be self-supporting or operated under
contract to govt agencies
tANDOVER.R B , WHEELER. R V Affiliation Unknown BO/OS/30 lp
BOO7H0611 Foriuards final rept of technical review of draft 10CFR60.
Bubpart E technical criteria
DAVia.S Ariiona, Univ of NRC-04-BO-217 BO/02/20 133pp
B007140640 Comments on proposed rule 10CFRHO NRC efforts to revise rule
must proceed in concert u/studies performed by other govt
agencies
VILLFOfiTH.J C HEW.Depl of. US Public Health Service BO/06/B3
Bpp
9007140691 Comments on proponed rule 1OCFRBO NHC radiation protection
*td* should be consistent u/app 11 cable federal guidance
ti Include consideration of work of recogniied natl fc intl
organl latlons
BATES, A Form Usgal - TN BO/06/EO I6pp
8007140D.93 Comments on proposed rule 1OCFR&0 raduaste should be
catagoriied by thermal characteristic, as u«ll as radioactive
characteristic w/dist inction at time period during which
media temp incmase*
DVER.G H Affiliation Unknown BO/O6/S6 4pp
B007190004 Comments on proposed rule tOCFRBO NRC has not adequately
demonstrated need for personnel dosimetry luting !i
certification program Citing improper use of dosimetry data
in epidemiolog ical (tudles as argument is Invalid
MOFFITT, A E Bithlnhem Step! Corp 80/06/24 lOpp
B007130075 Comments on proposed rule 10CFR50 concurs u/nead for Fire
safety rules & to upgrade eiistlng facilities Program should
not relit on existing (JFPA stds NRC shouH develop new fire
codes, especially new fire sprinkler codes
RATION, R H Affiliation Unknown BO/06/ It 9pp
B0071S0103 Comments on proposed rule IOCFR90 supports proposed
regulations Eilsttng fire e< tinguishprs are inferior fire
fighting tools Fixed KUpprus&ton sys for cables should be
automatic !> primary reliance should be uiater spray
PATTON.R M Affiliation Unknnuin BO/Oi/17 2p|i
B007130104 Comments on proposed rule 10CFR20 should incorporate (CRP-S6
u/o exception, urovlied incorporation would be compatible
u/ federal acceptable radiation risk policij
BUCHHOLI-R H General Electric Co ANT-1A-00 SO/06/ 16 3pp
8007190110 Comments on proposvit rule 1OCFJ120 present railiatlon std*
unsafe Federal govt should initiate energy program to
promote conservation !> renewable energy sources
ROHIC.D Affiliation Unknown SO/06/ 16 lp
B007130H2 Comments on proposed rule IOCTR30 oppose* adoption in
present form Deadline of 901101 for implementation ia
unreasonable Pruparatlon of fits needed since shutdown uinuld
cause adverse consequences to environ by pollution
CONNER, T D Affiliation Unknown BO/06/3O 4pp
8007150116 Comments on proposed rule IOCFR20 sperifie tlo-msnti of
radiation protection program should be develoned in reg
guides or other suitable documents Requirements Par
transportation uf radioactive matls already covered bij DDT
BERNSEN-B A Dechtel Power Corp (subs of Deditel Corp )
BO/06/17 2pp
392
NONDOCKETED ITEMS
B007150119 Comments on proposed rule IOCFR5Q impact of ruit
in/act: eji tab 1 e fire protection plan should tie investigated
Section 11, fart A.Paiagraph Sf ui J ] alloui inadequate
protection against aipusure (ires
COHN. D n Gage-Babcocli Associates. I nc BO/OA/26 2pp
on plants
QOO7160779 Comments (in proposed rule 10C.FR60 objects to storing high
level nuclear mastc in rock formations Hastes should be
stored in retrieval storage Facilities until genuine
disposal mot ho a is found
WASSEI1BACH, A C Affiliation Unknown 00/06/11 Ip
BOO7I3O1B2 Commenit-B on proposed rule 10CFF120- for vast majoritlj
individual s, no significant internal eipasura is accumulated
Hepnrling of in-ternal eiposure should only be required For
situations eiteoding 4O-h control measure
D15E, D P Niagara Mohauilc Power Corp BO/Di/17 4pp
BOO7170105 Comments on proposed rule 10CFR2Q promulgation of major
change luoulcf be disruptive ft not advance cause of
occupational radiation safety Licensees should not be
required to defend NRC dose Etds
LEWIS, L Duke Primer Co BO/06/17 llpp
BOO715QI3J Comments on proposed rule 10CFR5Q strongly disaare
fur proposed rule Alternative designs should remain
acceptable Proposed rule i« overly specific Imp Semen tat ion
date of eOliOl cannot be net
VAWN.A D (Jeorgia Power Co SO/06/37 3pp
B007I70I79 Forwards I Remson 900618 comments on proposed rule 10CFH60
to BMI Hydrology can perform containment function for period
its short as 1,000 grs Geocherni stry provides backup solution
to transport problem
NICHOLSON, T J Site Safety Standards Branch 00/06/26 Spp
6007)50134 Comment-! on proposed rules 10CFR2 ti 5O suggests rewording
aF Paragraph 3O tilt,} to reflect const & operation
considerations, gf fr power level inci ease not relevant to
significant haiards Finding
HOFFMAN, D P Consumers Power Co flO/OA/23 Ip
G0071 70191 Comments on proposed rule 10CFRSO on behalf of utils lilted
in Attachment A Eipresnes concern that most utils will be
unable to meet implementation date being mandated by
Commission Pages missing Prom Comment 8 docketed 800430
KNUTH, D F Kerr-McOec Corp BO/Oi/37 4Ipp
CD07130340 Comments on proposed rule lOCFRiO geologic setting
requirement should indicate detailed investigation necessary
to define a c tool & potential impacts Gradients vary due to
thermal conductivity tt boundary condition changes
MCGRAV,J 0 rtTirona, Univ of QO/06/26 3ff
BOQ7210I6B Comments on proposed rule 10CFRSO objects of proposed stds
on procedural 6 substantive grounds General objections
concern inadequacy of technical data & justification
supporting proposed rules
KEAflNEY.J Edison Electric Inatitute GO/Oo/30 SBpp
SOD? J 3-0)143 Comment* on proponed rule IOCFHSO concern* include
app 1 Icab 1 1 i ty, st hadul e !* overall eFFcct on Fire pratectlon
Rule should not apply to mods resolved in EEH iasufd prior
to effective date Implementation schedule unreasonable
HE1DER. L H Vanltee Atomic Electric Co WVC BO-SB eO/06/25
33pp
8007H1OS59 Camments on pr-oposed rule 1OCFR30 pilot study conducted by
Univ oF MI dons not accurately reflect capabilities of all
processors Clerical errors mhich occurred during studu do
not reflect performance of commercial processors
TDDD.W E Affiliation Unknoud QO/06/12 Spp
B0071EO152 Cominents on proposed rule 10CFR5D 20-day revlaui period
inadequate in light of eicesvively specific t- restrictive
requirements Outage time required for mods Bittnsive Co«t
outweighs benefits Alternate methods not permitted
HOWARD. J E DiistCTi Edison CD VP-N BO-i9 BO/Oi/27 6pp
BO 07320093 Comments on proposed rule 10CFR50 filed supresslon sg» For
cables should be automatic, not manual !< primary Reliance
should be placed on uiatcr spray Conventional Fire sprinkler
sys should not be used
PATraN.fi M, AFfiliation Unknpun HO/06/17 Zpp
BO0719O15B Comments on proposed rifle 10CFR90 atds should result in high
level of Fire safety Guidelines slanted toward us-e of uiater
for all tire pro teit ion problems Fir* brigade training
rev i a ion sugges ted
BUNSTRQM.R F Affiliation Unfcfiouio BO/06/34 Spp
— 00072^0102 Comments on proposed ruin 10CFR50 should not rely ovtrlif on
existing NFPA atds NRC should eatablish program to aicertain
viability oF suiting codes & begin to develop neu fire
roles Vendor Fire protection repts encl
PATTDN.H M Affiliation Unknown SO/06/li 7pp
B007I5O166 Comments on propn^ed rule 10CFS50 manually actuated Fire
suppression sys should not he- speciFied Fire barriers &
suppression sys must be inspected to maintain integrity Min
Ptre brigade S|JB questionable
MELOTT.R K Affiliation Uninomn BO/Oo/23 3pp
8007230^39 Comments on proposed rule 10CFR30 to require same spacing of
clear air space horizontally & vertically is inconsistent
Horuontal spacing of SO Ft is considered very ejtreme
FULLER, J K Public Service Co of Colorado P-BO20Q BO/O7/03
4pp
BO-07160196 Forwards comments on proposed rule JOCFR30 wording is vague
It unenf orceah 1 P Flip protection terms mentioned in app are
improperly uteri fe inadequately explained Comment period of
30 daus LS insufficient
BUNSAN.K M Affiliation Unknown BO/OA/19 App
Comments, or proposed rule 1OCFR7O requests NRC «liripliFy
licensing oF nuclear paffirnaiora
SMYTHiN P D Affiliation UnfcnoLini BO/O^/St 2pp
Q007220539 Notice of appearance in proposed rulemaking proceeding re
storage !, disposal of radiuaste Certificate of Svc encl
BEflOER.H F Oklanoma, Btata of QO/07/07 Spp
5007330048 Comments on proposed rule 10CFR30 high priority status for
adil changes to fire protection programs 6 design features
of enisling operating plants uncertain
CAHN, A L Ueehtel Power Cnrp (subs of Bechtel Corp ) BO/06/87
2pp
90071^)0405 toromsnts on propo-ap* rule IOCF R6I , approac h to regulation b
perf ormant e objactivos is highly commendable
flGuGEIS'J . WHEELER. H , uEPUCUlTER. J Los Al»mos Scientific
Laboratory HO/OS/ 11 Bpp
8007S6O415 Comments on proposed rul« 1OCFR50 concerned iii/sub jec tive
nature of many requirements
HATHAWAV.L fi Marsh 8. McLennan. Ire , M t M Nuclear Consultan t*. Inc
Piv 30/06/23 4pp
BO 07160'! 30 Comments an proposed rule 10CFR50 in general too vague for
eFFective imp lomentiHlon SlgniFtcont lack of def Inilions fc
ifiage of msriij tarms
ODDDHIN.C Portland Beneral Elec8i-ic Co 80/OA/27 lOpp
B007330044 Coimnents on proposed rule 1QCFR50 overly specific d In
present form could force changes reducinp, safety of plants
Consolidated Edison Co of Neu York BO/06/30 3pp
B007230M7 Comments on proposed rule 1OCFRBO proposed rule uiould not
allow For Flexibility or alternatives Regulation should
specify requirement d intent of fire protection program
CURTIS, N U Pennsylvania Power & Light Co SO/O6/27 Spp
00Q7230175 Comments on proposed rule 10CFR50 imp leniHntation dates
unreaaonablB >< impracticable Fire protection requirement!
impose Financial burflen on customers i subvert util earlier
compliance e forts
PDlNDEXTEFi, C >l Daltlfflore Oas & Electric Co SO/Oi/30 lipp
8007160593 AflvisBJ OF CPC arioptinn of EEI 800707 statement OP position
re proposed ru I emaliing on storage S< i(i«posa] of ruduaste
OriLLO.J Igham- Lincoln t< Bealc BQJ07/lt If
9007 160619 Comments fin proposed rules 10CFR3 ti SO concurs Wproposed
rule charj)» NRC can make si gretFiq ant hdiard* d'eterml nat i on
Nn publse Interest Is served by reiuiriiiB no~da«; mjit before
issuing amends of OLs Ii CPa
DALE.L F Mississippi Pome) t. Light Co AeC«-BO/lO& 80/05/2B
IP
H00723OIB1 Comments on proposed rule 10CFR90 insufficient comment
peri ad, conf 1 ic ts could exist re previously approved
requirements & value/impact assessment Proposed rule
ovcrpmscnp ti ve & inadequate
UHRIO.R E Florida Power t< Light Co I. -80-307 60/06/30 6pp
aOO723QlB7 Comments on proposed rule 1QCFR30 SER document Id agreements
ahould not be subj to another rovleui or mod Implementation
schedule unreasonable Previously approved agreement! should
not be rescinded
PEuPLES.D L Camrnonuiealth Edison Co BO/06/37 7"pp
NONDOCKETED ITEMS
393
9007230193 Comments on proposed rule 10CFR50 requirements impractical
It eiceaaive Implementation costs t. schedule unrealistic
HAYNARD, P V Florida Pouer Corp 3-F-a 60/06/37 Spp
80072303SO Addl reaponae to fDlA request for all info re changes to
proposed fire protection rule in SECY-BQ-QBS (, record of
Commission's vote Commissioner Bradford concurrence end
Six documents withheld fret FOIA Exemption 5)
FELTON, J M Division of Rules and Recoida 80/07/li 2pp
— 3007230336 Notifies that Commissioner Bradford concurs u/rsvisions in
BQ0416 memo re fire protection rule (3ECY-BO-OBB) Eicerpt
of rule encl
THOMPSONS U Commission BO/O4/21 3pp
0007330262 Comments on proposed rule 1OCFR50 specific fire protection
sys imposition will have severe impact on licensees
complying iii/previously approved programs & ui 1 1 retard
implementation
PRATT, C M Pouor Authority of the State of New York 9O/06/30
9pp
B007230BB3 Forwards affidavit of svc omitted From statement of
poiitlon of State of MM submitted B 00703
QLBON. J F Minnesota. State of 00/071*07 2pp
B007240003 Cammenti on proposed rule 10CFRSO concurs in comment! filed
by llcsnaees Implementation time insufficient Addl criteria
should be identified far redundant sys separation
DALTROFF.3 L Philadelphia Electric Co BO/06/3O 6pp
BQ07340136 Comment* on proposed rule 10CFR30 min fire pratHCtlon
issue should be reopened Arbitrary implementation date
unfair
HOFFMAN, D P Consumei-a Power Co 80/04/37 flpp
BQ072307O3 Comments on proposed rule 11CFR20 urges MltC to identify
10CFR20 or terminate agency action re proposed rulpmaking
LANQNEH.R R Dnu Chemical Cs , DDU Lhcmical U 5 ft Div 45FR1B023
O33 B0/0d/0a Spp
BOO7250710 Comments on proposed rule 1DCFR20 financial cost of
mandatary dosimetry testing program should be kept as low as
possible u/o jeopard I > ing validity of program
HQLDEN.R H Affiliation Unknown 45FRBtM93 032 50/04/25 Spp
8007230009 Comments on proposed rule 10CFR60 NRC should establish
criteria It slds for overall sys of high level radwastc
d i aposal i rather than defining specific performance values
for individual components
HQBIN5QN, R V Enon Nuclear Co . Inc Isubs of Elton Carp )
15FH31393 015 0Q/Q7/11 Jpp
BOQ73aOQI6 Forwards comments on proposed rule 10CFR6.O NFIC should
establish criteria t> stda for overall sya of high level
raduaate d i spocal , rather than defining specific performance
values for individual components
WALSKE.C Atomic Industrial Forum 45FR31393014 90/07/11 Spp
B0072B0024 Comments on proposed rule 10CFR60 rule represents
significant progress toward defining technical cilterla For
high level waste repositories Performance of required
barriers constitutes sound approach to licensing
MENARD.If U Interi or, Dept of. Geological Survey 45FR31393 012
BO/07/10 6pp
80072BOQ33 Comments on proposed rules 1OCFR2 !, 10 requests petition
be denied Requirement to conduct informal public hearing in
every instance would inhibit improvements in facility design
tt/or operation by diverting important resources
O1DDB. DC Atomic Industrial Forum 45FnSiO71 Oil 80/07/01 Spp
B007S4O140 Comments on proposed rule 10CFR50 comment period
Implementation schedule should be extended Comprehensive
value/impact It environ analyses re fire protection should
be conducted
MCOARRY, J H Debevoiee b Liberman 80/06/30 33pp
B0072Q0037 Comments nn proposed rule 10CFR60 draft technical critt
mill provide regulatory means to Implement requirements of
environ stds EPA mill propose in near future
HEDEMAN.H N Environmental Protection Agency 43FTt31393 O23
BO/07/1B 3pp
BO07240149 Comments on proposed rule tOCFRSO rule substantial &
unjustified deviation from past rulemaking practices
Bpecific App R requirements revoke approved alternate
approaches Implementation dates arbitrary
UNITE. L D Rochester Oaa & Electric Corp BO/06/37 <?pp
8007240147 Comments on proposed rule 10CFR61 federal (< state govts
•hould stimulate addl lou level raduiasto disposal site
development Supports establishing min radioactivity level
N»u 1< efficient sites should be developed
JENNINGS, J Affiliation Unknown BO/07/05 3pp
6007240131 Comments on proposed rulo 10CFRSO statement that prior
agr«»ments iu/NRC re firo protection are invalid not
reasonable Power plants have expended significant time d
money for mods to improve fire protection
UTLEY.E E. Carolina Power ft Ulght Co NO-BO-1001 SO/Q6/30 Bpp
B007EB0044 Comments on proposed rule lOCFRiO submitted by CA Energy
Commission draft technical criteria demonstrate that NHC is
auare of ISSUED relevant to repository licensing
VARANINI.E E California, State of 45FH31393 023 HO/07/I4 3pp
BQ072900SS Commenta on proposeil rule 10CFRBO rule raflectx NRC
vacillation Aftpr establishing Epeitfic fire protection
programa.NRC is proposing shift in groundrutes Resulting
safety benefits are feu
MCDDNALD.R P Alabama Power Cn -13FR3iOB3 041 BO/QtH-SJ llpp
B0072B0099 Comments on proposed pule 10CFR50 NRC is hampered because
original rule did not concentrate on dedicated remote
shutdaun capability as solution to fire risk Schedule fa*
completion may be unrealistic
CARNEY. J J American Nuclear Insurers 45FR360B2 O40 BO/06/ 30
2pp
B007240351? Comments on proposed rule 10CFR5O 30-day comment period not
adequate opportunity nor proper mechanism for setting forth
fire protection provisions Ad judicatory hearing would be
preferable
PORTER, M L Duke Power Co BO/06/30 £pp
— BO072B0067 Comments on draft reg guide. "Qua J i Pleat ion Tost for Cabl«
Penetration Tire Stops for Uie in Nuclear Power Plants "
Hgrst case for yenerie acceptance is valid method
SAWYER, R 0 . BDRNHOEFT.W M American Njcloar Insurers 79/OB/3Q
Spp
8007B40367 Comments on proposed rule 10CFRSO previously accepted
Fire protection attenativas should continue to be accepted
Alternate shutdown capability implementation negates
poiltlve mod aspects
THORPE, J R General Public Utilities - GPU Service Corp EliL-2534
BO/06/27 9pp
B0072B0713 Ack receipt of B002I4 1 tr t, petition, on tiehalf of vendor t,
17 utilsire NRC proposal foi interim emergsncu planning
Upgrade regulation Ltr !' petition treated as comments on
proposed rule Comments mill 6e considered
DIRCKS.U J Office of the Executive Director for Operations
BO/07/ 14 lp
8007240373 Comments on proposed rule 10CFR30 opposes proposed rule
ri fire protection because it circumvents reiterated pter
review comments t< is not directed touard power plant safety
enhancement Rule should he withdrawn
PIELAOE. H U Affiliation Unknown 80/06/28 Spp
8007E403B1 Comments on proposed rule 10CFR20 Dept of Commerce Natl
Voluntary Accreditation Program is possible alternative for
identifying competent totting labs Forwards B001S3 FR notice
defining personnel dosimetry criteria for accredited labi
LOCKE, J M Commerce. Dept of BO/06/37 4Spp
BQ07S5O524 Comments on proposed rule lOCFRiO quoting annual ratt
quantitatively apprear premature Concept of relative risk
should be addressed
OOHNSON.fi E Affiliation Unknown 4SFR31393 024 60/07/11 lp
B0072B0716 Acl rnceipt of petition for rulema» inj, on behalf of Dufc
Power Co, TX Utila & Generating Co t, MA Public Pouer Bye.,
requesting deferral of promulgation of final rulp on
proposed emergency plan regulations
DIRCKSiW J Office of the Eiecutwe Director for Operations
00/07/14 lp
B0072900O2 8ECY-aO-291
Recommends that Commlssian approve notice of denial of
Petition for RulemaMng 3-9 filed by Union of Concerned
Scientists !< Natural Resourret Defense Council Draft
documentation encl
BHAPARiH H Office of tlie Eieculive Legal Director 43FR4H621
BO/06/ 17 19pp
394
NONDOCKETED ITEMS
8QQ7S1QQQ5 Forw
role IQCFflEl
RDISMAW.A I
79/03/03 Ip
rds petition for rul-croak ing 2'B & comments on proposed
Natural Resources Defense Council 43FR4Bi21 21
—6007290012 Petition for rulemali ing on anenil to 10CFR31, re exempting
commercial grade tomponflnt supplier* From regulation'
submitted as comment Safety significance unfounded d
Inconsistent iii/past WRC activities
POLLARD, R Union of Concerned Scientists HD IBM AN, A I Natural
Reso
ces Defe-riSE Council 43FS4B6B1 31 79/03/08
14pp
B007270333 Forwards quarterly rept on proposed rules For period a tiding
BO 0430 R&pt provides public u/infn ra NP.C rul t making
activities. Related Ffi notice- Forthcnniinj
FELTON. J H Division OF Rules and Retards CO/06/24 2<bpp
8007S?Q2S6 "Security Facility Approval & Safeguarding of Not I Security
Info & Restricted Data," & "Financial Protection
Requirements t, Indemnity Agreements. " 10CFB9S b 140 final
ml* Reflects revised Canal Zone status
DIRCKS.H J Office at the Eieculive Director For Operation.*
BO/C-5/23 3pp
8007390424 Comments on proposed rule 10CFR30 prop-osed App R re Fir*
protection specific for regulation Regulation* should
provide policy or stat-emfrnl of position Implementation
schedule is unrealistic
DRAPER, E L Qulf 3tat«s Utilities Co -laTHSaOBa O43 E30/O6/2&
(JQ07a9OBSa Comments on proposed rule IOCFR20 recommendations of
natl !i intJ bodies must be followed flfrwisicns must not
be iisued until EPA, guidance is established Sugg-Bits coit-
benefib study
COUNBILhW a Connactlcut VanlieB Atomic Pouti- Co CQUNS1L, H 0
Northeast Nuclear Energy Co (subs of Northeast Utilities).
43FR1B033 71 BO/Qo/Se. 3pp
B00729085B Comments on proposed Tula JOCFH34 fully supports proposed
change
KOVACS, B Foster Uheoler Corp 43FR378B& 00-3 BO/07/IO lo
0007290867 Comments on proposed rule 10CFHSO Nlaoara Mohawk Payer Corp
•indorsee caraniBnts re fire protection Filed on S00i30 on
of van DUS ut I J s
HCBARfiV.J M J>pbevoi*B l< Llberman' 45FB360B2 032 BO/07/I4 tp
B00729D9H7 Hetjueits that util 7907H5 coinintnts on "Study of Nuclear
Pauiar Plant Const During Ad juiJUati on" be considered as
comments on proposed rules 10CFR2 & 50
MtLLS.t- M Tejinessee Valley Authority 45FP31279 OO3 PO/O7/02
Jp
8007300043 Commnnite on proposed rules 1DCFFI2 ft 50 on behalf of Heu
Enslancl Coalition on Nuclear Pollution re Immediate
effectiveness rule Urges implementation of Option C, total
repeal Const should cease during ABLAD proceedings
UEISS, E H Sheldon. Harmon & Weiss 45 FR34279 004 HO/O7/O7
7pp
6007300049 Comments on proposed rule 1OCFR30 endorses EEI comment!
Improvement of previously- approved schedules is
unreasonable Short implementation schedule may, limit careful
consideration OF fire safety provisions
DISC. D P Niagara Mohawk Power Corp 15FR360B2 039 BO/06/30
2pp
BOO-730OO55 Comments OD proposed rule 1OCFR50 Fire prottction rule-
imposes backfilling requirements bi/o affording license*
op-partum tij to legally protect interests Requests uiithflrauij 1
of App K reijulatlons requiring spucific Factual bases
TRIMBLE, D C Arkansas Pouer & Light Co 45FH360BH 037 BO/Oi/30
flpp
0007300064 Comments on proposed rule IOCFR30 case-bu,-cas» rrview
preferable to litgation luhlch would result From proposed
rule rtddl manpotuBi- requirBmentB for fii-u brigade definitions-
6 potential litigation costs eccessive
JflCDDS, S D 9tone & Webster Engineering Corp 45FD360B2 O3S
BO/07/07 4pp
BOO730006A Forwards commenti on projiosBd rule 10CFfi2O Pormalliins t*st
procadurp rraij result in pracesG-ors designing dosimeter to
pass test instead of providing host possible dosimeter
TAHABi 0 N Army, D apt of, Headquarters Material Development ft
Reaflinass Command 1SFR2O493 O47 90/06/24 3pp
3007300073 Commsnli on proposeil rule 10CFR50 modifies t, voids oiittlng
agreements between uti 1 R NBC Rulo Includes neiu rno.uirsmtn.is
not within scope of original fire Jiarard analysis b iaf*ti|
evaliration
HATT1MDE.J1 J Sacramento Municipal Utility District 45-FR3iOS2 044
SOVQ6/3Q 3pp
B0073000S1 Forwards comments on proposed rule 10CFR30 r»nu»»ti than)*
not be ad-opted as written fiequirod completion date ii
unreasonable Deadline does not consider overall fire
protection fn *rlotffnco at facility
MATTIiHaEFj J Sacramento Municipal Utility District 4SFH3iOB2 043
00/07/03 lOpp
B0073000as Cnmrnonti on propose* ru-le JOCrRSD proposed! rule on fire
protection boo .ambiguous Co provide desired results
Implementation date For new nods & rescinding of previously
agreed upon completion dates are unacceptable
FAV( C H Wisconsin Electric Power Co 4SFB36Oa2 049 BQ/O&/3O
B007300009 Foruiards comments on projc-sed rulo 10CFF12Q h»*ty rulBrnaUn
may resulb in adaption at rule before sound certification
pTpjrara hai been established Buog*stlons on estahllshAirnt of
test & certi Fleat I on program Included
EDkARDS,D 14 Yankee Atomic Elsctric Co 4SFRSO493 020 80/OA/B6
9007300014 Comments nn proposed rule 1QCFH2Q supports t*rtl Picatlon of
dosimetru processorB Several facets oF Health Phyiics
8oei*tij Otdi CDmrnlfctseyANSl 5 tit 9 ui 1 1 restrict influence on
determination of individual doses
VODEft.R C Datt«lle M*morial Institute. Pacific Northwest
Laboratorij 45Ffi20493 flfl7 60/06/85 l*?pp
B00730C-01B Comments on prapased rule 10CFREO (tronglu supports
requiring licensees So me tested 6 certified pes-ionnnl
ddtlrnetrij svc Tutino lab should be monitortd by NBB
PARfiOTT.M W Conferenee of Radiation Control Program Directors, inc
43FRS0493 O*B BO/07/03 3pp
B007300027 CuirnentE an proposed ruUs lOCFRa * SO OJi i«h«lf of JJoaton
Edison Co, Houston Lighting t< Power Co It Pug-tt Sountf Power tc
Light Saction a 764 should be reinstated IfflmmfiaU
eff»c tivaneai ruje should tint In amended
OARV.F B LDuiensti«injNBiiJman,n(m, Atelrad & Toll 45FH34a79 009
BO/07/03 3j>p
80073000-33 Coramtnt* on proposed rules 10CFR3 & SO on 4mhalf op utils m
immediate ef f»c tiveneis rule Fifth option, retention of
present s-ys. should be- adopted u/n>ad
* LeBosuF, Lanh, LBibij t- MacRae 4BFR34279 OOi 60/07/07 3pp
BOO7300039 Forwards ECnnents on propoiBd ru-les 10CFR2 l< 90 on bejialf of
UCS re Immediate ef FBC tiveneis rule Option C.ripeal of rul»,
it most appropriate action Cross unPairntis of rule
BTBmplifled blj Beabrook proceoding
WE1BB.E R, Bhaldon. Marmon fe Wuss 45FR34279 007 BO/Q7/O7 6pp
Q007300113 PNL-aaoa
"DisruptivD Event Analysis VolcantBm t, IgnmuB Intrusion "
CflOUE.D M Dattelle Memorial Institute- Pacific Northwest
Lab-oratory 11-102 79/10/31 47pp
800730014! Comments on proposed rule 10CFR50 App R should be abandons!
Ov»r»peciflta.tion of detailed dfeslgn t< procedural
req.uirHffiEnts are inappropriate Overspec i f icatiott voids
efforts to upgrado fire protection capabiliti)
- P Toledo Edison Co 45FR3i,OBH 051 BO/06/30 3pp
Q0073DOS34 Comments an p roo ace-d rule l-OCFRSO vound technical bultn nwg
n-ot enst tn support emeroenc^ planning innea noted in rule
Fif taen-minute no tl Fixation requirement is unrealistic
Specific comments end
CLkT3EN.fi C Energy, Dept of 4SFR751&7 303 BO/07/09 "?pp
800730024"? DNHI-1B
"Eummarv Character i lat Ion I. RetommBn-tfation of Study Areas
for Oulf Interior Rag inn "
» ITattelle H»norinl Institute 111-016 79/O5/3I, 70pp
600730041) Comments o-n proposed rule 10CFR73 re physical protection of
irradiated spent fuel in transit unneccesarlli) duplicative
routing requirements may confuse -carriers b interferi u/
private competi tion In snipping induvtrif
CUNNIHOMAM.O W Energy, Dept of 49FR3731)1? OOH BO/07/11 2pp
B0073001iV Comments on proposed rules, 1OCFR2 tt 90 only acceptable
option is Option £ uihich would retain present »(js unchanged.
Present sij s impacts on J*t t sionma k ing Ftlt only ui/reipect to
envlroni not safety -related concerns
PEOPLES, D L Commonuealth Edison CD 45FR34279 010 BO/07/O7
fipp
NOW DOCKETED ITEMS
395
fl0073OO'!75 Comments un proposed rules lOCFFlJ, 17, SO, 21 , 30i 40. 31 1 iiO t, 70
an behalf of Americans fur Indian (Jppoi tuni ty Part of rules
entitled. "Participation by 3l.it e Govts. ' should mention
Indian tribes
HARRIS. L Affiliation Unknown 44rR7010Q O33 BO/O6/27 lp
HOO7IOO12Q Cofimeritj, on p eti 1 1011 for
Lega 1 Founrta 1 1
costs to industry '. •
beat fnr situations
PDPEO.D J , BEHiltJC, I
.iking 140-2 bi| Wa&li ing tun
JDU III sub s t.nn 1 1 al 1 i
svtners I'r i ce-rtnder son appinacti IB
Dl.u.q slight chancL* uf d ids tor
rtFf i I ution Unknown DO/QA/1B 3pp
B0073Q096S Comments on proponed rule 10CFII34 oubniitted by Hughes
Airwest Supports limiting I equirement 5 for retention of
records at dally readings of pocket dosimeters No need for
retention of records for mum tlinn I gr
MeiER.H 0 Affiliation Unkniiiun 41FF<:]9B56 003 HO/07/ IO 1 p
a0071DQ123 Comments on petitio
petition Liability insurance
stockholders nut i ate p,-iyyrs
EDDLEMAN Affiliation Unknow
aking 14O-2 supports
poid f n I bij
B00730D9t9 Comments on propoacd rules 10rrfl2 t, 1O Cnmniiasion stdy for
granting stags should be rel.iied Basic procedures of
licensing process. inc lucling immediate effpctivcnoa rule, are
• ound
OA1.I-Q.J . WILLIAMS. F C Puhlir Service To of Oklahoma 45FR34379
DOT 00/07/07 tOpp
QO07300S71 Comments on proponed rules 10CTR5O ti SI ntrongeat
regulations possible should be applied to development nf any
EIS required by NEPA Supports Cnmmi "ssloners OilinaVij d
Bradford position
CW1RY.J 0 Affiliation Unlmoiun 43rn40101 005 BU/07/03 lp
3007300973 Comment* on proposed rules lOCDino & 51 all nuclear projects
mil* re CP has not been 1 oBueJi shoul d be required to undergo
investigation of Cult range of consequences possible from
Clas-s 9 ace 1 dent
Texas, State of ISF-flflOlOl 006 BO/07/1Q lp
0007310377 Comments on propnocd rule IQCrnDO implementation schedule
Par fire protection unroaaonab lo App Fl should reflect intent
of r>g flulde uhile allauilug floiibilltu re compliance
methods Proposed revisions unti
DVLVIA.B fi Virginia Eloctrit !, Pouor t-o 41FF136093 O13 BOX06/30
BOO7310441 Comments oti proponod rulea lOCrFIS f, BO present Immediate
•f Pectlvsness pule re const during adjudication should be
retained Recommend* adoption oF (Iptliin E re retaining
present iga
UflLSKE.C Atomic Industrial rorum t!3FH342/9 OH BO/07/0/ lp
--B007310'143 Commonta on "Study of Nuclear Power Plant Const During
Adjudication " Immeitiate cffoc tlvcneos rule should be
retained as It IB currently being Interpreted & implemented
Rule balanced reactor conet needs (. public oafuly
HALSKE.C Atomic Induslrlal Torum 79/Q1/3Q 3pp
B007310436 Comments nn propound rulos lOCFKrJ R 30 Findings 3,3,6,10 It
13 da not prevent convincing cnse fur change In Immediate
f ff ectl veness of rule re const during adjudication
VAN DRUNT.E E Arizona Public Service Co '13FR34E71? 012 00/07/10
Spp
6007310464 Formal1 (It comments on proponed rulea 10CFR2 !, 30 Soabrool
case Is no reason to change >IJF. of immctdiate effectiveness
HOT i uelaij in nucluar tlcennlng procese is intolerable Delay
ll chief ueapon of antlnucluoi movement
VANOENBUnOH. D Yankee Atomic Elcctvlc Co 4'iFna4£!79 013 BO/07/16
31pp.
aOO71OOl?6 CommiJiits un petition (or rulemafcing lflO-3 bij Association of
Dar of Citij of NV Providing nnlg liability iiiEuiatice uoulil
not tie in public intprvit *. lutiuld junpiirdiie nuclfiir pouipr
LEDERER.P D Affiliation Unkru.un 3O'Oi,']B Spp
30O710O130 Comment & nn petition for rulemoking I4O-3 t'niloriD3
oiisting rule fptitioTi does not rnlst" policy issues
requiring attdl ronuderation Pr i ne-Andor s&n At t ti jimpnds
inflect Congressiana] inttnt
NEXDN.H H CommonuBiil th Edibun Co BO/Oi./ia 3pp
OOO710O134 CommontE or, petition For ru 1 uma li i ng Ifld-a dpfonds Price-
Andcraun InsiiT-anLif ti Indemnity Prngra-m by des-cr ih ing
backgrounds oF proginra 6 hidtory nf nut I ear insuranco pools
PflOart. H C Amtncan Nucleai lusurer-i HCLLV. A Mutual Atomic
Energy Liability Underwriters 90/06/13 9pp
BOO7100390 Comments on petition For rulomaking 2-10 proposed mnda to
regulations are imnDededidetrirnent.il tn c F f 1 1 1 cncij ><
contrary to requirements oF law Petition should ba -ilenled
KNOTT9.J 13 Dobevoise % Lilierrnai. BD/0/./li> EJpp
BOO710O34'3 Comments on petitiun -for rulem.iklng 2-10 frenuent public
heannns oF trivial matter" would divert mgl attention !<
engineering re^uurces auaij From |flnrit ofi-erations Ci uuuld be
signifirsnt drain on licensee !< HRC resources
F-EDPLES, 0 L Cammonuiealth iTiinon Co BO/06/ 1A E^p
BOO71OO345 Commenti on petition for rulemaklng 3-1O oiiating rules fur
Formal intcrvenli on are suFficiont to ensure that person*
u/bonn fide interests got full npoortunity tip participate in
proceedings -Cnst-h eno F i t aspects compel donicil
BnOCHL.DJ Portland Denial tlwctiic Lo BO/OCj/11 S(i p
QQO710O335 Comments an petition tar rulemaking 2-IO b-uilgetanj &
personnel impact on NliT uinnlJ bo significant t- uouli!
obstruct •< delay licensing I'rnpo&cd chiingut uioulrl not raiao
quality uf public partlctpatLun or regulatoru, prnceGB.
PATTERSON, J D Middle "South Bervicea, Inc BO/0&/1S app
30O710O337 Comments on petition for rul&making Sl-6 tesl programs
should ho developed in rcactora at remnte tltea to evaluate
cladding & fuel damage d emission oP airborne J. liquid
Hffluonts before increasing nui 1 tai fxinl osscmblii burnup
QULBHANBEN, E A Pittsburgh. Univ nf 00/06/01 Ep p
B007100159 Commonte on petition ror
necessary only in cases uifiei a liL
roquirea EIA Petitioners' fonctrn
by current r eg-ulatoru, plans
DIPIAZZA.R P WBsiinijhiiuEC l£l«cfcric Corp
plemoking 2-10 hearings should be
Jing or reg ul iitory action
ire ad equa to 1 1; Bildresoeil
PETITION ran RULEMAKINQ
0007O3007B Comments on petition for rulemaking 31-6 Part 51 already
contain! provision requiring f.lB in appropriate cases Qulgg
petition should be denied bucniisn no NNC prapoenl for major
FtilHtrnl action is idontiPleJ
THOMAS. H N Virginia Clectrli !. Power Co 331 00/06/16 1pp
6QO703018A Comments on pa-tltion ror rulomaklng 31-6 EIS uf use of nigh
burnup nuclear furl would not he significant NRG review of
generic environ analysis uliould not delay issuance/ of amends
which an conditioned to times uhen fuol undergoes aipusurc
PARKER, W a Dude Poiuer Co no/06/13 9pp
B007O9029fl CommontB on Citiiens Advisory Doord of Metropolitan Area
Planning Agency petition Tor rulemaking 3-1O Opposes request
JUB to addl burden on llcenGing process u/o benefit at
p-rocodure ef ror tlvenestt PreBBiit rogulaLions fulfill request
COUNBIL, W 0 Northtaft Utilities C 1003.1 GO/06/ 1 i 3pp
HO07100077 Comment* on petition Foi rulemaking S-10 requirement for
informal hearing would apnlij License amend Involves no
»ign if leant safstij l*me
VAN BRUNT.C E, Arliona Public Beivice Co rtNPfJ-lS662 80/06/16
3pp.
0007100366 Comments on petition fnr nil emak i ng 15 1 -fc bettor U
utilliation (le-.s mining t- milling) ui 1 1 hnvc pucitivE>
effect on environ Improved UGstmblij designs u i 1 1 result from
current eitenileil burnup proijrdmB
C/WANAUGH, W Arkansas Pouei i< liqht Co 1 -IftO-tO
1pp
B007100370 Conmiunts on petilmn for ru I email i iig Sl-6 plans underuaij to
subject hlgh-burnup aDSemblicB from inventorij to periodic
BUTVoi I lane c to charar tei a jc bcliavior during water pool
storage Propose1; comb mat ion rcrfctai >, pool sui-vtu I lance
JOHNSON, A D Uattello Momori^l Institute, f'anflc Northuiest
Luborfitorij OO/ 06/13 3pp
BOO7H)O3B5 Comments on petition far rulemoking "il-i high burnup fuel
might produce mure radloatlivc ga^ from reactors li spent
fuel pools !< prndure d eter i or.iteiJ Lladding on apimt Fuel
rods NRC should support petition tu rpriuiro full FIS
KRICHIVEIl.n Affi I i at inn Utikntiun OO/OA/16 lp
B00710O'137 Comments on petilio'i for rolemakina 3-10. «n behalf of
Detroit Eitlson, Nugain Muh«iuk I"S( of IN fiorhcstor Gas &
Electric curi pnt NRf practice.1 re public lieanno/i ii
adequate No smenil tn regul.itions is necpsKarij
LEDDEUF.R J , LrtMB.H R , LI in I1, A C Lollocuf- Lamb, Le liy !r HaeflflB
BO/Ob/ih -lp(>
396
NONDOCKETED ITEMS
B007110-191 Comme-nts on petition tor rulenakino 51-A petition tafces
statements out at tonteit ', leaves incorrect implication
that greater fission gas releases are projected to accur to
environ in/use nf high burnup Fuel
LflNSiP M Enerju.Dept of 30/06/1O 2pp
8007110502 Comments on petition for rulemaking 140-2 since liability
insurant* provided by nuclear insurance pools 15 ma i
amount available.no change in regulations re financial
protection warranted
BOUDEN, T J Alaoama Power LO 80/06^23 IP
B0071105OV Comments on petitm" for rulemaling 140-2 requests
initiation of ru leinak ing proceeding to investigate
possibility nf anending raou 1 a 1 1 ons re Financial protection
requirements Far nuclear facilities
UDALL.H H House of Hep p Interior 'r Insular Affairs BO/06/20
IP
BOO7110522 Comments on petition For ru 1 emaliing 51-6 since high burnuo
nuclear Fuel program Is currently under development «V not
f ul 1 1] imp lemented,petitinn i & premature
DIPIAZZ^ff P West ing house Electric C-Dl-p WHD-LA-ISl BO/C6/li
3pp
B0O71I0329 Consents un petition for rutemaling 31-6 preparation of
generic E1S for high burnup nuclear Fuel unwarranted
Petition onould He denied
EDWARDS, D VJ Vonkee Atomic Electric Co HVC BO-SI BO/0A/20 2pp
BOO7140030 Comments on petition For rulemaking 2-1Q requiring formal
public hearings for every aroentfimnd f, suspension of QL mould
place immense burden on util t, NRC
MOODV.J » Vankee Atomic Electric Co WVC 00-19 SO/06/19 2pp
BO07140047 Comment* on petition for ruilemal ing 1 40-2 results sought 6 y
petitioners are beyond NfiC author) ty, utiuJDrkab 1 e !< unwise
To advocate mandatory conversion oF property insurance to
liability insurance is irresponsib! p
WALSKE,C Atomic Industrial Forum QQJOb/23 3pp
BO07140052 Comments on petition Far rulemakinn 1-40-2 NfiC should
Increase amount of primary lager financial protection
licensees are required to maintain
CHAMBERLAIN U M California, btate of SO/Ofa/20 lOpp
B007140235 Comments on petition for rylemalong 31-6 petition should be
denied High turnup Fuel 5fic.ii Id not increase impact an
environ since Fuel fc cladding in pool environ are reSatively
stable & conditions in Fuel stair-age pool less severe
PEOPLES, 0 L Commonwealth Edison Co 30/06/19 4pp
BOO71402'50 Comments on petition for rulema t ing 51-6 petition sftoiild be
denied Developmental progi am for high turnup fuel not
Intended to change eiisting regulatory linits of radioactive
release
MILUS.L M Tennessee Valley rtuthon ty GO/04/ 1 9 2pp
B007t4Q448 CortiniErits on petition For julemaHnj 14O-2 opposes proposed
change Nuclear liability insurance available from American
Mirclear Insurers is mai available From private •anurces at
cost & an reasonable terms
UDQDS,T G Arliona Public Service Co 80/06/20 3pp
BOO71i0410 Comments on petition For rulejrvaJ; ing £0-6 requests 5 minutes
during 600115 meeting ta present view on occupational
radiation eiposure stds
FLEISCHflKEJT. D S fjdtural Resources Defense Council BO/01/11 Sop
H00717027S Comments on petition for rulemalting 51-fa much OF petition Is
based on misinterpretation of technical tenflinol ogy t,
apparent lack of knowledge of cpntemparary, uorlduidE nuclear
Fuel cijcle research
SHIELDS.fl 0 Affiliation Unknown 30/06/13 4pp
SO072102/3 Comments on petition for- rulemakjno 2-1-0 change could prove
counterproduct-ive to public health ?, safety Establishment of
mm criteria on intervention should be designed to encourage
groups w/leg i timatp interest in pi-occ-Bdings to participate
UTUEV.E E Consumers Power Co BO/06/lfi 3pp
£9007230040 Cc""nent5 on petition For rulemaUng 140-2 rationale for-
pelitioneps coniluaion that present liability insurance not
mai insurance available premised on fatiltu analusis Of
insupance ma Wet
COUNSIL.W 3 Northeast Utilities MGC-flO-0-flia B&/0&/33 Spp
8007390002 SECV-80-21?!
Recommends that Commission approve notice oF denial of
Petition for nulemaking 3-*> Filed Siy Onion of Concavned
Scientists t> Natural RBSources Defense Council Draft
docuiriBntat Ion encl t*,^*Am.nt
SHAPAH.H K Office oF the E»ecutive Legal Director 43FFI4UA.H
90/06/17 15pp
— a0072<?OOD3 FoTWJrds petitmn far rulemaMnn. a-B & comments on propoi
rule 10CFK2] M*ej.ai i,
RDISMAH.A 2 Natural Resourtos Defense Council 43FR4H6.il ^1
79/03/O2 Ip
— BQ07S90012 Petition for rul enicik ing on amend to lOCrRBJire eiempting
commercial grade component suppliers from reflul ationi
submitted as comment Safety significance unfounded fc
inconsistent in/past NRC activities
PDLLARD.fl Union of Concerned Scientists ROIBMAN.A Z Natural
Resources Defense Council 43FH4B621 31 79/O3/02 14pp
BOO7300003 Comments on proposed rule 10CFRS1 proposed amends should
clariFg treatment of eiisting reactor sites as candidates
For atfifl reactors d whether product or process-nr i ented
review is required
MtULS, L M Tennessee Valley Authority
Zpp
027
9007300374 Comments on petition For rulemaking 51-6 generic E1S not
appropriate re use of high burnup nuclear fuol in commercial
nuclear reactors since overall environ impact mill be
positive Discusses misconceptions in petition-
TAYLOR.JH Gabcock * WilcOl Co 49FR3S357 014 BO/07/O2 flpp
PROJECTS - PREDOCHET LICENSING
B00710013J Forwards corrected version of Eihibit 1 to anaweri
Dept of Water Resources Fourth sot of interrogator i us
MEISS.FI L Pacific Gas & Electric Co BO/Od/16 Ip
— BOO710OI34 Corrected Eihibit 1 to answers to fourth set op
interrogatories re reliability calculations
* Pacific Oas !• Electric Co BO/06/1& 23pp
Q007! 60691 Advises NRC that proposal to extend LWDR operation Ui
discussed at 241 3 t ACRB meeting ACRS believes it is
acceptable to operate reactor core to 24 i 000 EFPH a«
proposed
PLESBET.M S ACRS - Advisory Committee on Reactor Safeguards
BO/O5/0& 2pp
Q007B30075 Request* revieui oF encl final QE18 on U milling Also
requests statement of concurrence in those sections
contributed by respective oFcs Final QEI9 has been prepared
in response to public comments re draft GE1S W/o oncl
MADT1N.J B Dtvision of Waste Management 00/07/O3 2pp
BO07230fl4O ForuiardB Amend 43 to FSAR
SCHABE.rt R Hanforfl Engineering Development Laboratorg 00/
— 0007230444 Amend 43 to FSfiR
Hanfortl Engineering Development Laboratory
aO07SB01B9 CommKnts on petit-ion for rulemafcing JflO-2 a
rulenaking to reform Price-Anderson Act
GINGHAM. J Hou9e of Rep 43FFOft973 Ol 2 80/07/03
trc-nfllu ur
Ip.
OOS7B BO/0&/Q4
0O07270039 Ac I rsceipt of B003I2 Itr Foruiarding essay, "Ficellsnco
in Operations 1J NRC shares hope that attitude uiill become
general In nuclear field W/o end NRC ta C Eberle Itr
DENTON.H R OFfice of Nuclear Reactor Regulation. Director
BO/07/14 Ip
— B0072'90042 Forwards essay, "Kicellence op Operations" From contest
inspired bu, quote in recent Inside NRC newsletter Hopefully
philosophy can eventually be general attitude of nutliar
field
SUMMERS, J Affiliation Un h iinun BO/O3/1 2 2pp
D007S90-J63 SuggBSta that ANL subcontract u/RAE Corp for Jul-Bept I9BO
to Flnalue App P dadon attenuation models) & App U (radon
control ccet-benefit analusisl for GEIS
MARTIN. D E Uranium Recovery Licensing Branch 80/06/10 Spp
— G007290470 Advises that NRC has no need for further afl«ist*nc» From
Btanleij Consul tants, Inc at present Requests extension of
contract until 800730 ITI case assistance is required for
rcvlttu o" finalned mall •
MARTIN, D E Uranium Recovery Licensing Branch BO/06/18 Ip
IMONDOCKETED ITEMS
397
NDNCOMPLIAWCE REPORTS AND RELATED CORRESPONDENCE
BO07S1OQ79 Part 31 rept re recall of maiding fitting* containing JS3
•grade drill casing matl Armco Steel Co lias completed testing
of all ram mails in plant, all in-process matl & in-process
of checking field complaints It matl returned to Tube Turns
If A V DEN, L E Chamtron Corp , Tube Turns Div BD/07/03 3pp
— 0007010031 Forwards (JA Pingrar
EC notice of deviation
POTAPOVB, U Region A, Da 11 *
Spp
Insp Rcpt
:, Vendor- Inspection Branch BO/05/OB
— B00tt>10039 Notice of deviation from map on 80D422-24
* Region 4, Dallas. Offue of the Director 90/05/06
B00734O371 Part 21 rept re dufectivo Atomic Energy of Canada Limited
commercial products. Mode 1 s Tneratran 60 Si BO & Eldorado 6 &
B teletherapy units Cause not stated Affected subsystem IB
radiation Field lighb sys assembly
R1DDUT. E F Atomic Enorgy of Canada, Ltd QABO-7-129 SO/O7/O3
— BOO7O10031 Of, Program Incp Rept 9190D34Q/S0-OI on 300423-24
N&ncorap 1 lance noted Oft instruction* for control o* magnetic
particle eifltnu bid not contain all info specified bg ABME
Colics
KELLEY.W D , WHITESEtL.D 1= Region 4, Dallas, Vendor Inspection
Branch BO/05/Oi. 9pp
HOO73SQ297 ForiuardB Part 31 ropt re Valcor valve Part VSKiOO-534-1 ,
uhich Palled to cycle immediately Pol lowing sustained period
of continuous energitation Caused bg use of values not
designed far operating condition
BQROO. O 0 Valcor Engineering Corp BO/O7/G3 4pp
80070-10135 Ac* receipt of H00422 & 0515 Itrs informing .NRC of steps
taken to correct violation noted in QA Program Insp Rept
999Q03B4/BO-O1
PDTAPOVB.U Region 4, Dallas, Vendor Inspection Branch BO/06/O4
IP
IOCFR. PART 9 -
7B1 22 10353 Forwards IE Insp Ropt 30-13OS3/7B-01 on 731011 No Items of
noncompliance noted Insp included slam of activities at
Pittsburgh office re radiation safety d compliance u/rules
h regulations W/oot rept
MCCLINTOCK.R 0 Reoion 1. Philadelphia. Fuel Factlltg b Materials
Bafitu, Dranch 7B/1O/31 lp
BOO309-0523 Ack rociipt of fiC0130 1 tr informing NRC of it«p» taken to
eon-act violations noted in IE Insp 79-01 on 791312
MCCUNTOCK.n o Region 1, Philadelphia. Fuel Facility fcMatoriala
Safety Dranch 00/02/26 Ip
— B009O9O&24 Rmponda to NRC B00109 1 tr re violations noted in IE imp an
791212 Corrective action* discussed infractions u/
technicians involved Classes planned in/all technician! on
requirement* tt restrictions
CARMEL, p Rad Bsrvlces, Inc BO/O1/3O Ip
— BOO5090927 Discusses IE Insp 79-01 an 791212 & forwards notice of
violation
MCCLINTOCK. H O Rug ion l, Philadelphia, Fuel Facility * Material*
Eapnty Branch BO/01/09 2pp
-8QQ701O142 Oespundi to NRC OOOSO2 Itr requestiiig adbl info re previou
response to In-ap Ropt 999C103B1/BO-O1 Apologsies for error in
response diie to tgping mi-itulie Product audit does fliist In
QA sijs Tnanual
HUPPERT. W W Gulf t Weslprn Industries. Enc BO/05/IS 2pp
-BOO7O10147 Ack receipt of HO u 4 23 1 tr informing fJRC at steps taken to
correct violation S< deviation noted in OA Program Insp Re-pt
999003B1/BO-01 Requests addl Info
POTAPOVS.U fltgioii 4, Dallas. Vendor Inspection Branch BO/05/Q2
-B0070101S1 Rusponfts to NRC B003&3 Itr re violation & deviation n-otEil In
Oft Program Insp Rept 99900304/30-01 CnrTecUve actions
bulletin re JOCFR2J to emnloijees & dealers has been
distributed Harking prnc e-Jur-cs uil 1 1 bi; updated bg B006O1
HUPPERT.M W Oulf (, WEstern Industries. Inc 90/04/32 ISpp
-0007010154 Foruinrds Oh Program Insp Rept 999OO36il/BO-01 on gOOGO3-07 !.
notices of violation tt deviation
PQTAPQVSiU Region 4. Dallas, Vendor Inspection 0 ranch BO/03/28
— 8007010163 Motice of violation from insp on BO0303-07
* Region 4, Dallas. Office U f the Director 80/03/26
— BOO 3 09 053 9 Notice of violation Prom imp on 791212 Noncomp liance notod
raqulred radiation Burve<|B not performed on packages-
TBCfl ived
» ReSion 1' Philadelphia, Office of the Director BO/01/09 3pp
BOO937O&G3 Ac k receipt of R00421 Itr informing NRC of tttps te*«n to
correct violations noted in IE inap of Licen»fl 37-13139-0-1
on 80OS38
CROCKER, H U Regian 1. Philadelphia. Office of the Director
BO/OS/07 Ip
— 0003290607 Responds to NRC 13003SB Itr re violation! noted in IE insp of
LlcBnse 37-13130-01 on BOQ2SB Corrective actions n«u
procedures will bu developed to improve coordination In
rflcvlpt of incoming radioactlvu samples
KtM^S H Radiation nanagoment Corp BO/O4/EI 2pp
—BOOSZ10i,ia Di»cu»»BS IE insp of License 37-131S7-01 on 000BSB !<
foruards notice of violation
CROCKER, H U Region li Ph i UJolpUia, Office of thi Dlrectar
2pp
— BOO70IOti7 Notice of deviation from mot, on BO0303-O7
* Region 4, Dallas. Office o-f tJie Director BO/O3/SA 4pp
— 8007010171 QA Program Insp Rept 9990O3B4/SO-Q1 on BOQ303-Q7
Noncompliance noted failure to follow IOCFR 31 procedures
Receiving in&p had not been done using sample tobies of insp
manual
FOSTER, W E , HUNNICUTT.D M Rfgiun •!. Dallas. Vendor Inspection
Branch B0/03/2ei lOpp
BD07100326 Ac k receipt of B0033O lr informing NRC of steps taVen to
correct deviation noted in QA Pros ram Ins? Kept
9990004B/BO-01
POTAPOVS> U Region 4, Dallas, Vendor Inspection Dranch SO/O6/O3
IP
— 8007100330 flesiiunds to NRC B0a*>19 Itr re deviation noteed in QA Program
Insp Flejit 99900048/80-01 Corrective actions mill wafce everv
effort to ensure tliat audits are conducted on time
SWAVNE. R U Anchor/Darling Valve Uubs Anchor/Darling
Industr les )
-S009B70616 Notice of violation from imp on BQQS2B Noncompl 1 anc o noted
failure to keep records shouting pncaipt of radioactive
samp les
* RBflion 1. Philadelphia, Office of the Director BO/03/2B Ip
— B007100333 forwards QA Program Insp Rept 9990O049/SO-01 on 000421-33
notice oF deviation
POTAPDVB.U Region A, Dallas. Vendor Inspection Branch 80/03/19
QUALITY ASSURANCE INSPECTIONS
-B007100036 Notice of deviation From 1nsp on 800431-35
* Region 4, Dallas, Vendor Inspection Branch BO/03/13
B00701OQ1S Acfc receipt of B003S3 1 fcr re discrepancy between notice of
deviation contained In OA Program Insp Rept 99700340/00-01 ti
Procedure QAI-031-OO3 Notica of deviation should have been
dlicussod during exit meeting
POTAPOVB, U [legion 4, Da 11 at, Vendor Inspection Branch BO/O&/17
IP
— B007Q10029 Discusas* discrepancy betweeen notice of doviatian ti item
not»d d discuaied bij WK Kalloy during B 004 23 -34 audit &
eiit tntervieui Procedure QAI-021-002 referenced In notice
contains six riaf iciencei Procedures tncl
MVERS.F 8 Yariuau Corp BO/OB/23 IBpp
— 8007100339 QA Program Inip Ropt 9990004H^BQ-01 on HOO'42!-23
Noncompliance noted fallouun torrccttve actions -for audits
not taken ulbhin specified timoframe
WHITE8ELL. D E , HUNTER, V H region 4. Dallas. Vendor Inspection
Branch 60/05/11 5pp
B007 140033 Ac k receipt of SOOIHO 1 lr informing NRC of steps taken to
correct deviatinn noted in QA rrogram Insp Rept
9990040 l/BO-01
PDTAPOVS. U Region 4, Dallas. Vendor Inspection 13 ranch
IP
393
NONDOCKETED ITEMS
— 8007140037 Desponds tp NRC 8O03O2 Itr re deviation noted in QA Program
Inap Rept <J'/I?OQ'»01/BO-O1 Corrective actions all 1980
internal audits have been rpvlcuie-d t, published within 3D
days of p o5t-.iiJ(l 1 1 conferences
FTHERIDGE, M ft Carabun ti on Engineering. Inc 00/03/30 3pp
— HOO7140O31? rnruardB QA Program Insp Re(it 999004Q1 /BO-Ol on 800408-10 b
notice of deviation
POTAPOVS.U Region 1, Dallas, Vendor Inspection Branch BO/OS/02
Spp
— BQ07140042 Notice of deviatic-n. from insp on 500409-10
« ffpgicn 'I, Dallas. Vendor Inspection Branch BO/O5/01 JZpp
— BO0714004B Oft Program luap Kept 9990Q-401/BQ-O1 on S0040B-IO
None &mp 1 l.inc o noted audit repts not issued luithin required
timo b corrective action on previous insp nol taken a*
commi tted
HflLE.C J . [f/JCEKLEV, R H . AGEE, J R Region 4, Dallas, Vendor
Inspection 11 ranch SQ/O3'O] 19pp
8007140057 Ac It receipt of EQQdOa Itr Informing NSC of stops takan to
correct violation noted in OA Program Inap Re-pt
990052 I /QO-01
FQTAPQVS.U Region 4, Dallas, Vendor Inspet lion Branch BO/06/11
ipp
— B007140063 Forwards Bechtel response to 1 tarn op noncomplianc • noted in
OA Program Insp Kept 99900531/80-01 Corrective action
Ini tla ted. hokiever Part SI evaluation not conducted Requests
common t &
POTAPOVS, U Jiegion 4, Dallas. Vendor Inspection Branch 00/04/30
IP
--8007110079 Responds to N/JC B002I1 Itr re violation noted in QA Prooram
Insp Rept 99900921/60-01 corrective actions amended
10CFRS5(e) i-ppt InclurfBs corrective actions & provliioni for
closed loop actions uill be incorpora tetf into practdurts
CrtFlACU. I ft UuchteJ Power Corp (sub* of Oschtal Corp, (
— B0071f>014t Qrt Program Insp RBpt 99900021/00-01 on BQ0421-24 No
noncomp I lance noted Major areas Inspected heat treatment,
nonconformances d correetive action & impl EmBntallon of
lOCFRSO.App B criteria
DAFJNCS, I , HUNNICUTT.D M Region fl. Dallas, Offic* of the
Director 50/04/30 App
8007160150 Forwards QA Program Insp Flopt 999QQ026/SO-D1 un B00411-1B No
noncompl i-ance noted
POTAPOys.U Region 4, Dallas, Vondor Inspection Branch BO/05/14
2pp
— S007160157 QA Program Insp Rept 99900036/QO-O1 on S00414-1S No
noncompliance noted Major areas inspected implementation of
lOCFHSO.App D criteria
OLLER.R E , HUNNKUTT.D M fiegion 4i Dallas, Vendor Inipaction
HTBTfth aO/04./2Q Spp
B007160161 Forwards QA Program Insp Rapt 99900521 /BO-02 an B004E8-03O1
Mo n-oticomp 1 iancs noted
POTAPOVS.U Region 4, Dallas. Vendor Inspection Branch 00/05/19
— 90071*0171 OA Proflram Insp Rept 99900321 /BO-OH on 800420-0301 No
none ompl ianc e noted Major areas inspected implementation af
requirements of 10CFH30, App 'D. in area of design Inputs b
dBfifln insp
BHICKLEV.R H , AOtTE.J R , HALE. C J Region 4, Dallal, Vendor
Inspection Branch BO/OS/ 13 9pp
BOO 714,01 77 Ack receipt oF BQOhQb Itr informing NRC of steps t.k.n to
correct deviation noted in QA Program In«p Rept 99900104/
HO-01
POTAPOVS.U Region 4, Dallas, Vondor Inspection Branch BO/O6/17
IP
— 8007160189 Responds to NRC 800507 Itr re deviation noted in QA Program
Imp Rept 99900104/50-01 Corrective actions welder*
I-* instructed re hardFacing
HVLANDiF D Westlnghouse Electric Corp BO/06/06 Spp
— B00714OOHH Forward* Qfl Prografli Insp Rept 'J9900SS1/00-0 1 on BOOIO7-IO
notice oP violation
PQTAPOVS, W Region 4, Dallas, Vendor In lp»ction Br»nih flO/03/11
3ft
-B007160193 FoTuard) OA Program Insp Itept 99900104/GO-01 on B00421-29 &
notice of deviation
FDTAPDVS,U Region 4, Dallas, Vendor Inspection Branch BO/05/07
— 3007140087 Untie* of violation From ln*p on 300107-10.
0 [legion 4, Dalian, Vendor Inspection Branch 90/02/08
— 8007160202 Notice of deviation From insp an 800421-29
« Region 4. Daili*. Office of the Director 80/09/09
2pp
— 0007110090 O/i Program Intp Kept 99900Saj/aO-01 on B001O7-10
None omul IVITIC c noteif de-sign of &,if etg-rela ted componenti not
evaluated
HALE.C J , ufilCHLEV, R H , OnEAUX, D G Region 4u Dallas. Vendor
Inspection Dr.inch B0^02/Oa 12pp
— aoQ71i0207 QA Prooram Insp Rept 999001 04/QO-01 on B00421-23
Moncomp 1 tance noted' uvlding performed outside parameters of
•isentiat variables
ELLEHBHAW, L E . HUNNICUTT.D M Region 4, Dallas, vendor Inspection
Branch 00/05/09 &pp
000714,009^ Ack r«ceipt oP BOO(iD3 Itr informing NRC of steps taken to
correct ilevintlon noted in DA Program I nap Rppb 999005O3/
BO-01
POTAPOVQ.U Rngion A. Dallas. Vendor Inspection Branch BO/06/17
B007to0393 Ack receipt if B00il3 Itr informing NRC of steps taken to
correct deviation noted in QA Program Insp Rept 99900001/
BO-01
POTAPUVB.U Region 4, Dallas, Vendor Inspection Branch BO/06/1B
IP
— B00716O10V Responds to NRC HOO907 Itr r* dsviation noted in OA Program
ln«p Hept 99900303/ao-O! Ct>i-reelivs actions mod of drawing
ti »pet modified for clarification oF design rtvieu) (e check
pro)CB*6
KENDRICHSDN-T A Burns !, fine Co 80/06/09 7pp
"0007160397 Responds to NRC 800513 Itr re deviation noted in QA Program
Insp Repl 9(??01>001/QO-01 Corrective actions deviated Fuel
roils in tray tagged as to non-conforming condition
QARDCH-C J Dabtocfc & Wilcoi Co . hluclear Material Dlv 80/06/13
4pp
— Q007ifc0115 ForujjirilB OA Program Insp Hept 99900S&3/BO-01 on QOD414-18
tiottcn of dGviatton
POTAPDVS. U (legion A, Dallas, Vendor Inspection Pranch BO/DS/O7
2pp
-H007160404 Forwards OA Projrnm Insp Rept 59900001/80-01 on 800429-0503
tt notice of deviation
POTAFOV3,(J Region 4, Dallas. Vendor Inspection Branch BO/OS/13
2pp
— B00716013I flotjce oP qeviatlon Prom inop on H00414-1B
* Dogion t, DallSK, OFPirt af the Bfcrector SO/03/06 2pp
— 5007160408 Notice of deviation from inap on B00429-OS02
* Region 4, Dallas, Vendor Inspection Branch 80/O3/09 2pp
--B007I6012A QA Prodram Insp Rept 9 9900- 5 03 /BO -01 on SG0414-1B
Nnncomp 1 i sues noted certain saPety-r*l »teil calculation*
lacked veriPUation statament tt some audit* improper 1"J done
FOX.D r , HFlEAUJi. D 0 , HtLE, L J Region 4> Dallas. Vendor
Inspection Dranth DO/O5/06 9pp
8&071&OS33 Foruarils OA Program Imp Raft 9WOOOH1/BO-01 on 600431-2^ No
noncoma) ianc e nntml
PQTAPQV3, U Rpglrin 4, Dallas, Vendor Inttpection Dr-anch BO/OS/Ot
Spp
— B007lfi0411 OA Program Insp Rept 99900001/60-01 on B00429-Q303
Noncofliplianco noted 15 fuel rods not properly tagged
MCNEILL, H M , l-JHITESELL, D E Region 4. Dallas. Vendor Inspection
Branch HO/05/O9 7pp
S00721O257 Fo-riuartfa QA Program Insp Rept 99900390/00-01 on BOO313-li No
none ompl lance noted
PQTAPDVB.U Region 4. Dallas, Vendor Inspection Branch 80/03/87
NOIMDOCKETED ITEMS
399
"0007310361 QA Program Insp Flept 79900390/80-01 on B00313-16 No
noricomp 1 lane e noted Major si eat, inspected implementation of
JQCFRSO.App D, Including control of nonconf ormanc es t,
corrective actions. weld control It audits
BROUN.R L , WHITESELL.D E Region 4, Dallas, Vendor Inspection
Branch BO/O5/23 6pp
B007210269 Forwards QA Program Insp Rapt 99900289/BO-02 on 80O503-09 No
noncomp 1 lance noted
PQTAPtJVB.U Region 4. Dallas, Vendor inspection Branch 80/03/38
Spp
— B007S10273 QA Program Insp Sept 9990O2a9/BQ-OS on BOD505-09 No
noncomp 1 lane e noted Major areas inspected implementation of
lOCFR50,App D !i applicable codes fi stds & action on previous
innp findings
BUTTON, J U , WHITESELL.D E Region 4, Dallas, Vendor Inspection
Branch BO/05/21 4,pp
(3007210536 Forwards QA Program Insp Ftept 99900716/BO-Ol on BQ0313
No noncompl iance noted
POTAPOVS. U Region 4, Dallas, Vendor Inspection Branch BO/05/29
Spp
0007330133 Ac k rtcexpt of HGOAI*? Ur informing NRG oF steps taken to
correct tievidticm netted m Qf\ I'rogtdfn Insp Hept
99900507/QO-O!
POTAPDV5,U Rptjioti 4, Ddll,i5 vrndnr Inspection Branch BO/O7/O2
lp
— B007230160 Responds to NRC HW1532 Hr re deviation noted in HA Program
Insp Rept 99900507/BO-01 Torroctive actions due to other
commitment*. corrective action uii 1 1 IIP delayed until Q00701
MCFARt-AND, J t Sargent ', Umdy. Inc BO/06/19 lp
8007350O52 fit I, receipt eif BOO'iiE Ur informing NRC pf stepe taken to
correct deviation noted in 1A Program Insp Repl
99900036/BO-OI
POTAPOVB.U Region 4, Dallas, Vendor Inspection Branch SO/O6/10
lp
— B0072SQ0^7 Responds to NRC B00424 Itr re deviation noted in OA Program
Insp Rept 99900036/QO-01 Corrective actions personnel !•
supervisors have bean re instruc ted re importance of
yeld mat! segregation
DATES, tj J , M1U.ER. L C . 5TDNE, U A Combustion Engineering, Inc
BO/05/22 Spp
— BQ07B10539 QA Program Insp Kept 9990071 6/BO-01 on BOOS13 No
noncmnpl iance noted Major areas inspected implementation of
cause, corrective action & generic considerations re closure
problems in N1DD23 Fire dampers
OL-LER.R E , HUNNICUTT.O M Region 4. Dallas. Vendor Inspection
Branch 80/05/22 Spp
8007230136 Ark receipt of BDO&53 1 tr informing NRC of eteps taken to
eorrtct deviation noted in OA Program Inap Rept
999000B9/BO-O1
POTAPOVB.U Region 4, Dallas. Vendor Inspection Branch BO/07/07
— BOO7220142 Responds to NRC 80O52B Ir re deviation noted In QA Program
Insp Kept 9990OOB9/BO-O1 Corrective actions personnel from
other depts mill be trained to perform internal audits
HAN, K Huico, Inc 80/06/23 2pp
--B007B2014S Toi-DdrdE QA Program Insp Rept 99900089/80-01 on 800505-08 b
notice of deviation
PQTAPDVB.U Region 4, Dallas, Vendor Inspection Branch BO/03/2B
Spp
™ BOO7320150 Notice of deviation from insp on B00503-OB
» Region 4, Dallas, Office of the Director BO/03/37 lp,
—8007220155 QA Program Insp Hept 999OOOB9/BO-01 on Q00309-OB
Noncomp 1 iance noted dcpt heads did not Include probable
cause or effective date of corrective action in response to
adverse Findings
HUNTER, V M , WH1TEBELL, D E Region 4, Dallas, Vendor Inspection
Branch SO/O3/B7 6pp
8007230182 Ack receipt af 000627 Itr informing NRC of tttps taken to
correct deviation noted in QA Program Insp Rept
99900325/BO-01
POTftPOVB.U Region 4, Dallas, Vendor Inspection Branch 00/07/07
IP
--BOO72201B9 Responds to NRC BOO604 Itr re deviation noted in QA Program
Imp Rept 99900325/80-01 Corrective actions initialed book
fur neu ettruder far all active orders run on that machine
Procedures For scheduling shop orders are being written
AIRDLA.E 13 Brand-Ret Co BO/06/37 3pp
— B007220196 PoruardB QA Program Insp Rept 99900335/BO-01 on 800520-23
I> notice of deviation
POTAPOVB.U Region 4. Dallas, Vendor Inspection Branch 00/06/04
--B007230075 Toriuards QA Program Insp Hept 99900036 /BO -01 on BOO407-11
Ei notice of deviation
POTAPOVS. U Region 4. Dallas, Vendor Inspettlon Branch OO/04/24
2pp
—0007250100 Notice of deviation frum insp on 8004O7-11
« Region 4, Dallas, Office of the Director SO/04/23
3pp
--B00725010? QA Program Insp Rept 99900036/BO-01 on B00407-11
Nontomp liance noted signoff on certain shop traveler ufas n-o t
in accordance in/Criterion a of 10CFR50
BARNES, I , ELLERSHAW. L C , HUNNICUTT. D M Region A, Dallas, Vendor
Inspection Branch 80/04/23 15pp
B007250184 Forwards QA Program Inap Rept 9990071 3/HO-01 on 800429-30
No noncompllance noted
PQTAPOVB.lf Region 4. Dallas. Vendor Inspection Branch BOVOS/14
2pp
--BQQ72501B9 OA Program Insp Rept 99900713/flO-Ol on 900437-30 No
noncompl lance noted Major areas inspected QA program If
possible handling damage to instrumentation
OLLER.R E . HUNNICUTT.D H Region 4, Dallas- Vendor Inspection
Branch BO/OS/13 9p(i
B007230585 Ack receipt of BOO&ZO Itr informing NRC of steps taken to
correct deviation notod In QA Program Insp Dept
99900398/00-01
POTAPOVS.U Region 4, Dallas, Vendor Inspection Branch BO/O6/26
8007230SB7 Responds to NRC 80(1522 Itr re deviation noted in QA Program
Insp Dept 9990039B/80-01 Corrective actions revised Be-ctioti
1 fl, I*aue A of product design engineering manunl to conform
u/ current practices
CONNELLY,D 0 Ooneral Electric Co BO/06/20 6pp
8007250&B9 forwards QA Pi ogi am Inap Rept 9990039B/BO-01 on BO0303-09
d notice of deviation
PBTAPOVS.U Region fl, Dallas, Vendor Inspection Drnnch BO/OS/BS
2pp
-B007390592 Notice of deviation from inap on B00505-09
* Region 4, Dallas. Office of the Director 90/05/20
2pp
— 8007B302O2 Notice of deviation From Inap on 800520-22
* Region 4, Dalian. Vendor Inspertion Branch BO/06/04
3pp
-S007S30594 Qa Program Insp Kept 9990039B/80-01 on B003O3-09
Noncomp 1 ianc e noted practices not consistent u/Criterion 9,
rtpp D to 10CFRSO fc Section 1 4. Issue A of product design
engineering manual
HUNNICUTT.D M , FOSTER, U E Region 4, Dallas, Vendor Inspection
Branch DENNETT. A D Region 4, Dallas, Office of the Director
BO/05/30 9pp
— BOG722020B QA Program Insp Ropt 99900325/BO-01 an B00520-22
Noncompllance noted no clear 1< complete documented
instructions For shop orders initiated ti no eitruding
guidelines generated for several tasks in progress
HWNNICUTT, D M . FOSTER, W C Region 4, Dallas, Vendor Inspection
Branch 80/06/04 9pp
8007S3013B Foruards comments to be incorporated In B&U procedures
Implementing 10CFR21 Remaining actions stated in BOOS20 Itr
re safety matters appear to be adequate Add! verification of
proper implementation uiill tie undertaken
BTELLO.V Office of Inspection & Enforcement, Office of the
Director flO/07/09 3pp
BOO73BOOB3 Forwards OA Prog
No noncompllance noted
POTAPOVS.U Region 4, Dallas, Vendor Inspection Branch
2pp
Insp Rept 99900519/80-01 on BOO324-SB
00^04/29
— BO072HOOBB OA Program Insp Hppt •*9900519/bO-01 on H00334-2B No
noncompl iance noted Major ai eaa inspected design inapj
potential IOCFR21 items !e action on IIIOVIDUE insp finilinfjE
DRICKLEViR H . AOEE, 0 fi . HALE, C J Region 4, Dal la?. Vendor
Inspection Branch BO/04/21 21pp
400
IMONDOCKETED ITEMS
B007290O30 Foruards l/olgenau 7B043H Itr to Gore b SErV-79-44BE. onutte
from V Stello B00709 Itr W/o end
PERANICH.H W Division of Rest tnr Construction Infection
BO/07/17 lp
00Q72903Q7 Foruards Qrt Program Insp Rept 99900404/80-01 on B001S1-24
No noncDnp 1 lante noted
PDTAPDVS.U Regiiin 4. Dallas Vendor Inspection Branch 30/Ot/Ofc
3pp
--B007S9D321 OA Program Irisp Hept 99900404/30-01 on B00121-24 No
nontompl lance noted Major areas inspected review of
procedures t. Controls adofltetf to implement reqoirementi of
Region 4. Dallas, Vendor
ANDERSPN.D G . BRICHLEV.R H . HALE, C j
Inspection Branch 8D/ObfOfa l7pp
HOO7a90327 Forwards OA Program Insp Rept 99900404/BQ-02 on 800S]p-li
No noncompliance noted
POTAPOVS U Region 4. Dallas, Vendor In«pection Branch BO/04,/03
—00073903D7 OA Program Insp Rept 99900404/80-02 on 000312-16 No
noncofflpl lancp noted Major areas inspected design corrective
aclionr interfaces !< inputs
BRICKLEY.R H . ABEE. J R . HALE. C J Region 4, Dallas, Vendor
Inspection Branch BQ/O6/Q4 lapp
0007290338 Ack recsipt of BOOSOB t. 0707 Itrs informinp NHC of steps
taken to correct deviation noted in QA Program Insp Beet
999002 16/60-01
PQTAPQVS.U Rpgion 4. Dallas, vendor Inspection Branch 80/07/31
If
—0007290368 Responds to NfJC BOOS.I7 Itr re deviation noted in OA Program
Insp Rept 9990D216/BO-01 Corrective actions Procedure H-306,
available in draft form during insp. was completed !>
distributed to personnel involved
KAIZ.L Tubeco. Inc SO/07/Q7 2pp
—0007390370 Ac* receipt of 80030B Itr informing NHC of steps taken to
correct deviation noted in OA Program Insp Rept
99900216/BO-01 Addl info requested r» Item M
POTAPQVS, U Region 4, Dallas, Vendor Inspection Branch 80^06/17
*P
—000729039? Responds to NRC 900414 Itr re deviation noted in OA Proa,
Imp Rept 99900216/80-01 Corrective actions area of pipe
attachment uas ground to depth sufficient to rt
contamination & examined by liquid penetrant
OOUDSM1TH.H luoecw, Inc BO/O3/OB 15pp
pipe
possible
—8007390304 QA Program Inap Rept 99900333/BO -01 on BOD1B1-23
Noococopl lane E noted revised uelding procedure spue not
submitted ta customer For approval OA pragrait) not in
3ccavdan.ce u/codo reo.uirem&nts
HARNE5, I • HUNNICUTT, 0 M Region 4, Dallas. Vendor Inspection
Branch 80/02/3] I3pp ,
8007290836 Forwards CIA Program Imp Rcpt 9990Q3li/00-Ol on B0052B-3Q
No noncompl lance noted
POTAPOys.U Region A, Dallas, Vendor Inspection Branch 00/06/H
Spp
— 8007290B62 QA Program Insp Rept 99900316/00-01 on 800520-30 Major dril
inspected action an previous find Jugs. nanconfarmanceB &
corrective action, training- records t, procurement controls
OLLERpR E , POTAPOvS.U Region 4, Dallas, vendor Inspection
Branch 60/06/12 7pp
BOO/J3QQS73 Ack receipt of 8.00316. t, 07Q9 Itrs informing NRC of ttip»
taten to correct deviation noted In OA Program Insp Rept
•S99DD712/BD-D1
POTAPOV9.U Region 4. Dallas, Venflor Inspection Dronch QO/O7/I7
8007300176 RHsponds to NRC 000611 Ui- re deviation noted in QA Proo/rad
Insp Rept 99900712/00-01 Corrective actions internal audit
forms revised la intlude all depts Certified mat! te»t T»pta
obtained for 10 spools of weld uiire in question
CAPRA.L A BuBtemit Control, Inc BO/O7/Q9 &np
-0007300IB2 Aek rei-i-ipt of 000516 Itr informing NTtC of steps taken to
correct deviations noted in OA Program Imp Rept
99900713/BO-01 Requests addl info re actions taken to
prevent eiclusion of any rfppt from twice yearly audlU,
PQTAPQvS.U Region 4, Dallas, Vendor Inspec tion Branch 80/Oi/ll
B0073001B8 Respontfs to NRC 000414 Itr re deviations noted in OA Prog
Insp Rept 99900712/00-01 Corrective actions all
certification on welding matla shall be obtained prior to
releasing to shop Current drawing policy IB boing revised
CAPITA. LA Sijstems Control, Inc 00/03/16 Hpp
Q007300192 Forwards OA Program Inap fiapt 99900712/80-01 on B00325-J7fi
t notice of deviation
POTAPQVS.U Region 4, Dallas, Vnndor Inspsctlon Branch 00/04/14
3pp
8007300194 Notice of deviation from insp on 000333-26
• Region 4, Dallas. Offlco oP the Director 00/01/11 4pp
0007290474 Ack rete.pt of B00415 t, 0515 Itrs informing NRC of steps
* ("""atlons noted '" Ofl "»»'- "»> *•»
POTAPOVS.U Reg.on 4. Dallas, Vendor Inspection Branch BO/06/06
lp
8007300193 QA Program Insp Rept 99900712/00-01 on 000333-26
Noneompaancp noted failure to conduct internal audit, of
I u HI ° available certi PlcationB for ueld wire
assigned reiponsibi \ itu for effectiveness of personnel
HtSI?i"v * i""""-'""10" " "1'br program requirements
Dlv SH-360
POTAPavs,U R.ginn 4, Dalles, w.,dor Inspection Branch SO/07/2I
8007290481 Ac* receipt of B00415 Itr m respon.e to NRC 000S22 Itr
Requests addl info re flct,ons taken to assure effectiveness
of personnel training b indoctrination re continued
compliance w/callbr projram
POTAPOVS.o Region 4. Dallas, vendor Inspection Drench BO/04/29
FoTal>r'>* response to NBC 800222 Jtr re dev,ationB noted in
""? K'"* ™°°™'*°~<» Correct.ve ac^ n' QA "
t0n*rD! r0cl-
-&0073003IS Provides foiiou/up to 800S09 Itr rfi deviation noted in
' r ^tv rrefiet^,T°02I4/BO-°i ForUBrda "»"»« """Sur
i "«;rf;n.p; or^1?^ pr°9ram for nutieir prot"jct "u'iit«
DONEGAN-Q C Anderson-Oreenuiood. (, Co BO/07/09
13pp
PQTAPOUs.U RegiDn „, Da]l3s. Vendor Inspection Branch flO/06/04
|6«lr,K V RBglon 4. D«|l«, Office of the Director BO/02/22
^
POTAPOVS.t, Rfi9lnn ,,
NONDOCKETED ITEMS
401
-8007310179 Responds to NRC BQ0321 Itr
Insp Flept 99900039/79-03 Corrective
requirement UJas result of human irri
possible QA manual modified
SLU1S, B J , VAN DE POLL, W N Rhine-1!
ApparatenDouu KD BOO 1 9 BO/O4/33
re deviation noted in Oft Progran
actions error in sketch
:hcldB-Ve
Sop
0007070416 Comment* on prono*i
0 Ri g Guide B XX NHC hi
is ob 1 i gation to
in right direction
issrq step
EVDOHIMQFF, V fj Boston Ur, i >
. Medical Center Boston
i.HA 80/Ot/lO
IP
-B007310I76 Ack receipt of BOD3I9 Itr informing NHC of steps taken to
correct deviation noted In flA Program Insp Rept
99900039/79-03 Requests addl info
PtJTAPQvS.U Region 4, Dallds. vendor Inspection Branch BO/Q3/34
0007090418 Comments, on prupc
Effects shnula be deleted
Reg Guide B XX
ff data &houi-s nc
nentinn of genetic
effect ti Pear
uihen patient* die not advisi'd Uurmg i-ray procedures
CORNELL, D A 1'rincipia College ao/0t>/03 lp
-B007310183 Responds to NRC 800H4 Itr re deviatmn noted in GA Program
Inop Rept 99900O39/79-OS (.Directive actions missing revision
numbers on master travelers filled in Z< design review of
itreas i-epts mill be conducted
LOD»ER,M Rhine-Schelde-Vct-oIme Ifuiaro Apparat enbouui KD B0013
BO/02/19 &pp
Q0071000'f3 Comments on propt'Pd Reu. Guide B XX NRC regulation of 4-0
tnp 5-hr/uli is lEgiil require men t that bears no relationship
to dost1 recu wed for most rad I onuc ] i d es
MEALY, J U Uo-s Alamo', Scientific Laboratory HH-32 SO/Ofi/04
2pp
-BOO73101B9 Forwards OA Program Insp Rept 99 9Q003<?/79- 03 on 791105-O8
notice of deviation
PQTAPOVS.U Region 4, Dalian, Vendor Inspect 1 on Dranch BO/01/14
3pp
BOQ7IO01QU Comments on proposed Reg Guide 8 XX sufficient eraph;
should be put DTI fact that levels of exposure resulting in
detectable effects are higher, b u. orders of magtii tutl B, than
doses alltiUJi-d ti u current ipqulatton ar attusllij received
DAYNAHU. P Y Florida Power Corp SO/O6/1I 3pp
-B0073J01H9 Notice of deviation from insp on 791IOS-OH
* Reoion 4, Dallas, Office of the Director SQ/G1/11
-B00731019S OA Program Insp Rept 99900039/79-02 on 7"711Q5-QB
Noncomp 1 ianc e noted failure to Include procesR spec revision
number on master traveler & Incorrect definition of test
specimen deptli from forging surface- recorded
BARNES, I , POTAPGVB.U . HUNNICUTT, D M Region 4, Dallas. Vendor
Inspection D ranch BD/Ol/ll lOpp
REGULATORY GUIDES
7V09SlO17t Comments on proposed revision to Reg Guides 5 7,5 11,5 44 E
9- 97 one person adequate as o-b server of offloading *i opening
of itintla J( pactages as long as second employee present
Specified calibr stds should bo permitted
NILSON, R En on Nuclear Co , Inc <&ubs of Enon Corp ) 79/OQ/02
Zpp
S007O1O30B ForiuardB F(l notice of issuance ti availability of draft reg
guide, "Instruction Concerning Risk From Occupat lona 1
Radiation Eiposure " RequeBtt publication at earliest
pacslblc date
CHILK,B J Office of the Secretary nf the Commission 80/03/33
HO0702011B Comtnents on Reg ttuidc 1 125i "Physical Models for Design !<
Opvration of Hydraulic Btrutturus ti Elys for Nuclear Power
Plants " portions eiist uhich applicants may not be able to
follow
LEX.B L Dochtel Power Corp (subs of Dechtel Carp ) 77/O9/3Q
BO0709O395 CommentE on proposed Reg Guide B XX guide mould be valuable
*«*ist to operating personnel HI nor reorganization uould
Improve usefulness Presentation as currently organi led may
•cart potential worker off before understanding situation
HAMPBON, D C Oak Ridon National Laboratory BO/Oi/11 lp
8007090398 Comments on proposed Reg Guide Q XX dissemination of info
•hnuld be considered prior to employment, to mlnimlio
difficulties of Question 31 Same program to Inform local
cttiiens would be appropriate for guidp
MELBDN.R R Firei Corp 80/O&/11 lp
QQ0709-Q400 Comments on proposed Reg Gil i be 8 XX statement that estimates
of radiation rishs are as reliable as estimates from any
other important haiart) is patently false People should be
made aware of different views of highly qualified eiperts
CHILDERS.B Affiliation Unknown BO/OS/39 lp
B007O9040S Forwards ropt cammeriting on proposed Reg Guide I 97 Comments
b*| student! do not represent opinion of faculty Increasing
amount of info reactor operator must know during accident
is not beneficial Computer* should be considered
SAVAGE.M R , MILLER, D W Ohio State Univ BO/OH/OS 159pp
HOO7090413 Comments on proposed Reg Guide B 14 response op Trar* Etch
devices should be determined in environ where used Power
reactor health personnel should be required to make spectra
msaujrements & calculate response of survey meter
RYAN, R H ftensielaer Polytechnic Inst BD/O6/03 3pp
BOO/100113 Comments on proposed fleg Guide 6 XX some discussion on
public perception of riz)< ^dould be i nroTp prated People
need to be f,liown that por[p]'tinn tit nucleai risk is greater
than threat
FORD.C H Heuter-BtokBB. Inc SOVOd/JO 2pp
Q00710011& Comments on proposed Reg Guide B XX cigarette smoke *<
natural radintion are lumped together a* cancer- causea,
implying itlatively equal nirigii i tuil e Such statements are
misleading !, detract Prum realistic evaluation qf risk
TUMft.A T Popular Bluff Hosp Popular Bluff, MO SO/O6/O3 Sffi
a007IOO!Sa Comments on pTOpaspd Reg Guide B XX word "generally" should
be added to Gups-cion 14 Evidence ciists to •support body
repair especially at lou levplb of mpoaurc ?r for large
numbers of people eiposed
DRABTER.J J Affiliation Unknown BO/O6/03 lOji[i
QDQ7I001S'? CommentE on proposed Reg Guide B XX guide Fills vital need
at Bupplijini] sober, ac cur atu fi ccmparotiva data re l-ishs of
life work Reasonable charge tu users mould not be out of
line Highly recommends policy
LUND,H H Memorial Hosp of Natrotia County Casper, WV BO/Oi/10
QOD7100133 Comments on proposed Reg Qmdi' B XX prudence of lera
threshold should be pr«sent-iid En oner ui/some Biplartation of
controversy about assumption Argument presented on medical
vs occupational eiposure d i i ernma is weak
FRIES.C A Chovron Reseflnh Cu B0/0(,/17 lp
HOO71O0135 Comments on projicopd Reg Guide B XX Question 3Q, Answer I Cl,
oliould be eliminated entirely Effect of paragraph mill be
to touch off another •serivs of attempts to Force uamen out
qf nuclear industry
j M S General Electric to BO/06/03 3pp
GOO710DIG7 Comments on propoie-d dcg Guide B XX eitending analysis to
future generations may result in substantial long-range
damage Question 4 should ilrau distinction betuieen
procreating t< nonprucreat i nj unnrknr^
KRAMER. P D Williams College, Massachusetts BO/Ot/11 Epp
Q00710017O Ftiruiaids comments on proposed R-eo. Ouidp B XX clear-It) uiritton
t< auperior to instruction clas^e'S on radiationi effectB
Bibliographic d.ita should be given For "independent study "
BOELDTiEJ Affiliation Unknown 80/06/17 4pp
B0071001U1 COmmetits on proposed Reg Gut dp B XX total bodu, radiation
should nev»r occur other than far that done by
i h iroprac tera, etc Presenta ti on should be reversed to prevent
individuals becoming overly frightened
HENRV-S U Affiliation Unknown BO/OS/P* 2pp
BOO7IOOI9<b Comments on proposed Re() Cuide B XX instructional sheets
will be very hplpful In trying to eiplain risks of radiation
to personnel Table 2 * s B&PPC i al 1>| valuable In relating
risks to other necoss^ru, things in life
BERKEBILE.R D ElyTia Memorial Hosp Elyrla.DH 80/O6/I3 lp
BOO71003B6 Comm-en ti on proponed Revision 1 to Reg Guide 1 131 in
Implementation of ongoing qualification prog rams, environ
conditions of cables that will be need For subsequent tests
should be monitored Jj documented
HASKIM, K P Southein CaHFurnia Ellison Co BC1/OS/30 2pp
402
NONDOCKETED ITEMS
BOO7I0041fa
properly
RANDALL ,fl C
uorfcpr^pflut entire Mi
?jposure fia° not F»per>
* at™,.-. Coordination -ranch
80/4)5/27 lp
B007100425 Cogent* on proposed Beg Guide 9 XX gPitfe should mention
that NHC litensees presently are not required to provide
neutron dosimeters for wnriers t. that na i Hose does nut
reflect eiposure which warier may also cipenence
DREV.l. fl Affiliation Unknown BO/OS/30 lp
B007100437 Cofli™Br.ts by Hie Algom Corp, Lisbon Mine. on propose! FUg G>
B XX info J5 greatly neetled not only For uorkfnefi But general
public Supports NRC in intraducing info in form of
'o Affiliation Unknown 90/Oi/OS 3pp
8007100434 Comments, on proposed Reg tuidf B XX firart 11 uell written,
concise * corrprBh ensive etioujn for general instruction of
radiation uor*ers Ehnulu incliioe dif Far ente in effects of
WhaU-body or critical organ dose It partial Unify dose
ORANLUMD.B U Penn sylvan 10 Stale Unlv BO/Ob/OH lp
flOO7!40475 Cominentt on proposed Beg Guide B XX to eliminate
ulae-sgread irrational fear on part of public, info re
nuclear sys !< polities should be disseminated'
CHAP1N.D Smithsonian Institute BO/O6/I2 2pP
0007140483 Comments nn proposed reg guide. "Instruction Concerning Ri«li
from Dnupatnonal Radiation Eiposiuve " Population base ill
Tables S t 3 doe* not include estimated number of days of
lost life eipectancy
CEMBEH.H Northwestern UmW BO/Ob/3t lp
80071-10573 Comnents on possible use of utl 1 load ilispatt* microwave
linfcs to insure communication between WRC (* plant fc role of
Bej Cuide 1 1? in determining safety vector IE developing
list of utll toad dispatcher telephone numbers
DENTONiH R Office of NucUat fleactor Regulation. Director
BO/O7/01 Sfy
— BQ0714057H Draft specs. "Functional Requirement for Safety Parameter
Displaa Technical Support Ctr Emergencu Offsite Facility
H'jtlsar Data Lint "
I Commission SO/06/07 30pp
B007140i86 Comments on proposed Res Cuitfe -4 1 4, Revision 1 introduction
needs clarification Respondent doe) not understand mhat kind
of environ impact MRC expects after Secommi ssioninj at U
«tllS
MASHIHOTO.K Affiliation Unknown BO/Oi/O? lp
aoO7t500B5 Comments on Reg Guide 1 97. Revision 3 original choice of
fission chamber was prudent 6F3 t D10 detectors inadequate
for measuring neutron sensitivity
LINOREM, C L Affiliation l/nknoun 00/04/31 2pp
BOO715O153 Comments on proposeif R«g Quid? 4 1 fl, Revision I NBC a priori
asiumpt inn* that radiation protection programs Designed far
man are adequate for uildlife are unfounded Proposes
matures to rannjtor uildlife
DANTELSQW, L J National Hi Id life Federation CO/ Oil/ 16 Spp
BO0715O159 Consents on proposied Reg Guide 4 14, Hevia ! o.n 1 environ data
units should be appropriate for control level refF effluent &
environ monitoring data should be separated & drinking uater
• Dm lot'lng requirements ate unreasonable
HOOMEY.R R , PETERSON, D 5 Washington, State nf 60/06/24 2pp
2pp
pmLLIPS, L E
Core performance Branch 60/06/83 31pp
90071BOI74 Responds to request for concurrence f« Reg Ouide 1 Ml,
R,"»l«* 1. ''Containment Isolation Provisions For Fluid
SUB " neoulatory position section of guide sotl sfactory
Should not designate imp lementnti on on Cfl6erbi'7i:a*e *"*'*„
OEMTOH.H R DFfice of Nuclear Reactor Regulation- Director
HO/07/03 4pp
—3007130175 Responds to WM Morrison 80041? memo re Rea Ooid. 1 111.
"Containment Isolation Provisions for Fluiu By* " Approval
u/cownenta recommended Guide should be updated to reflect
latest version of /\NS1/ANS 56 2 when available
WH_ER,W R Containment Systems Branch 80/09/08 Epp
B0071B0175 Comments on proposed Revision 1 to Rea 0«ldt 6 12 concur*
gofde position that dosimctry requirements can generally be
met by quick screening teihnio,uea .„-,,-,,
SHITH.D n Los Alamos Scientific Laboratory Q-14-18-CB-76,
B0071B0330 Comments on proposed Reg Quide B XX. ' Instructions re Rials
from Occupational Radiation Exposure " ApproacH to rl»V
analysis !. training falls In its mission to educatt
Identifies style, ciintenti emphasi 9 & synta« problems
ANDHEHS.J P Catalytic, Inc (subs of Air Products fc Chemicals.
Inc ) BO/Q6/17 4pp
B00724O475 Comments on fire protection Reg Guide I I20'*«ce»i
automation mag present haiards greater than HP» PlooninB t«
collapse of trails may be seri DUB. Hater redistnnco of agld
dry cafilea unknobin
EDEB6DLE.J C ACR9 - Advisory Committee pn Reactor Safeguards
74/09/16 3pp
0007290060 Respond* to B00701 roquost for clarification rt use of
Level I personnel to perform direct inops L»vrl 1 p«rsonnel
may perform ttste using approved procedures Level II
ptTsonnel can evaluate It rept test results
JIAAB5.W P Qualitv Assurance Branch BQ/07/li lp
B0072BOOS7 Commant* on proposed rule 10CFHSQ NRC Is hampered b»c»u«»
orlBlnal rule did not concentrate on dedicated romote
shutdourn copability as solution to fire risk Schedule for
completion may be unrealistic
CARNEYjJ J American NoclBar Insurers 1DFR360B2 040 BO/04/30
2pp
— B0073B0067 Comments an draft rug guide. "Qualification Test for Cabl»
fsnetration Fire Stops for Us" in Nuclear Power P!*ntt "
Marat case for generic acceptance is valid method
SflUVEfl,fi 0 , BDRNHOEFT.H H American Nueleflr Insur»i-« 79/OB/30
Spp
B007310iao Notice of Issuance fc availability of Revision 1 to fi«B fluid*
9 57, "Shipping El Receiving Control of Strategic BNMi "
incorporating recent changes to Commission physical
pro tec ti on regulations
SMITH, R 0 Office of Standards Development. Director, BO/07/OS
3pp
8007150342 Comments on draft reg goii)e> "Instructions Concerning Risk
from Occupational Radiation Eiposure " Question & answer
format unsatisfactory More complete presentation could be
nad« in shorter teit by avonding leading questions
SLABACK.L. A D*f en>E, Drpt of. Defense Nuclear Agency BO/0&/17
Spp.
AND TECHNICAL ASSISTANCE REPORTS
BOOS130445 "UWR Thormal Hydraulic Development Programi " monthly.
highlight Itr for Feb 19BO
JONES. 0 C Brookhaven National Laboretorv FIN A-3043
flOO716D44i Comments on proposed Reg Guide 7 XX. "Measurement oF
Radiation Lewis on Surfaces of Packages of ftadioactlve
Matls " Surface dose rate s-haulrf be redefine-d as that uhen
UtigBr tubs of surveif metei- touchei package -lurface
FfflES- D A Catalytic. Inc (subs of Air Products & Chemical i.
Inc 1 SO/06/13 2yt
BOO71607'?0 Cooneiit» on proposed Reg Guide 1 OS re selection !< training
of nucltar plant personnel qualifications neede-d In plant
penonnel underestimated Operators should meet airline pilot
level requirement*
MILL I Si C A Philippines V9VOA/I1 lp
BOO70200I1 "Nuclear Pouter Plant Design Concepts for B«bot*g»
Protection." fifth quarterly projrB** repti Apr-June 1979
ERICBOff. D H Bandia Laboratorle* FIN A-1210 77/OS/SO llpp
00O703001A "EipenmBntal Criticality Data for Cod* Validation,"
informal monthlg progress rept For May 19BO
BIERMAN.9 R Batten* Memorial Institute. Pacific Northu«»t
Laborato-rij FIN D-2094 80/06/02 3pp
IMONDOCKETED ITEMS
403
0007020085 "Vapor Source Distribution Electrically Hedted Vol-Boiling
Sijs." to be presented at BOOS 1 3- n ASME. Century 5 meeting
symposium on polyphase flow t. transport tethnolog y
GINSBERG. T Brookhaven National Laboratory BNL-NUREG-27461
BO /OS/ 15 12pp
"IiwBBtig.ttion af Po^t-CHF Heat Transfer ffn Water-Con 1
Reactor App ] i cation !. Do vel iipmpnt of Tiuii-F'hasD F- 1 oui
Instrumentation,' monthly piogtuss rppts for Mai -Apr 1 9DO
CHEN, J C , SUriDAIfAM.R V, , NUHAWAM,S I. e hi ah Umv FIN A-4055
NRC-04-74-ieo BO/01/S2 /PP
SO070203SA "Safeguards Analysis for Dyproduct Mails !, Small duantffii
of BNM, " monthly progress rept Mar 19BO
CHESTER. R D , KANAK.K V, , RANDOLPH, M L Oak Rulge National
Laboratory FIN B-610B DnNU/HASBD-75 BO/Q4/14 6pp
800717O61B "Environ A&se&sm
progress rept
21TTEL.H E Oak Ridge National Laboratory
ORNL/ED/E1S-1 30 80/05/31 dp p
of Fuel LUC le Facilities,
nonth! y
3007020364 "Shutdown Heat Removal 9gn Reliability in Thermal Reactors "
SUN.V H , DARI.R A Hrookhaven Motional Laboratory
•BNL-NUREG-27595 BO/06/30 Bpp
(3007030015 "Code Assessment *< App 1 i cations Program Piping SIJE Stress
Dependent Damping Study "
QRUBB.n L EGt.G Idaho, Inc FIN A-6156 79/10/31 SOpp
0007110113 "Physical Protection of Nuclear Facilities. " monthly
progress rept for May 19HO
CHAPMAN, L D Sandia Laboratories. FIN A-JQ6Q BO/06/1B 6pp
B007UO591 "Sanilia Core Melt t. Separate Effects Program," monthly 1 tr
for May 1VHO
HERMAN, H Band i a Laboratories BO/Ofc/23 Bpp
8007140031 "Evaluation of Docket Files of Terminated Licenses," monthly
progress rcpt for Hay 1980
mLDWAV.C F , DICKSON. H W Dak Ridge National Laboratory FIN
A-9OB5-7 GRNL/HASRD-fll BO/05/31 18pp
0007HOD44 "Safeguards Analysis for Byproduct Matls d Small Quantities
9f BNrt. " monthlij progress rent Par May 19BO
CHESTER.R 0 . HANAK.K K , RANDOLPH. M L Oah HJdge National
Laboratory FIN B-6IOB QRNL/HABHD-B3 BO/06/1 1 6pp
&007140903 "Environ atateniDnt'i Projecti" monthlij progress
Hig 19BO
ZITTEL.H E Oak Ridge Mational Laboratory FIN B-Q001
OnNL/ED/EIS-131 PO/OS/31 5pp
n*pt For
O007HO507 "Div af Reactor Safety Research - ORNL Programs." May I960
nonthly highlights
MVNnTT.F R OaV Ridge National Laboratory 60/06/10 36pp
90071 40634 "Technology t, Costs of Termiriatlon Surveys Associated
H/Decommi ssi oning Nuclear Facilities. " monthly progress rept
for Hay 19BO
D1CKBQN.H W , HOLOHAY, C F Dak Ridge National Laboratory FIN
A-<)04a ORNL/HA3RD-B3 BO/09/31 5pp
00071404.43 "Investigation of Post-CHF Heat Transfer for Wattr-Cooled
Rtjctnr Application t< Development of Tula-Phase Flow
J^s trumentation. " monthly progresK rept for Hay 1980
CHEN, J C , BUNDARrtM, R K . NIJHAVMN.S Lehlgh Utiiv FIN (S-4055
NRC-01-74-1BO BO/06/17 fipp
BO07130Olb "Advanced Instrumentation for Reflood Btudiesi" foreion trip
np-t
HEF13KDUITZ.M D . MCCDLUOUQH, N D , ROBERTS. M J Oak Ridge National
Laboratory FIN B-0113 ORNI-/FTR-B50 BO/O6/Q.5 7pp
80O71S0099 "Licensing Audit Calculation (LACE) Models in FRAP-T4 Code
Description & Developmental Assessment. " interim rept for
Apr 19BO
BOHM. M P , SIEFKEN, L J , LDATS, E T EQ&Q Idaho, Inc FIN A-tOSO
EOO-CDAP-3144 80/O4/30 SOHpp
9007130233 "Street Corrosion C tar It ing of PUR Steam Generator Tubing,"
monthly highlights for May I "JBO
BUL1SCHECK.T . VANRDOYEN.l) Brnokhiiven National Laboratory FIN
A-330B 60/06/17 hpp
80071BD3AQ "HTGR bafsty Pt-ogi Jm, " monthly highlights for May 19BO
BASTRE.C Brookhaven National Laboratory FIN A-30,16 SO/O6/O7
5pp
Q0071BO2A5 "TRAL Assessment !< Mode! De VB I npment, "
for May 19BO
8AHA.P BroaVhaven MationaJ Laboratury TIN A-3E1 &
hfp
nth 14 high! ights
BO/05^31
B0071B0353 "Thermal Reactor Ssfctij Code Development. " monthlij
highlights far May 1930
LEVINE.M H Drookhaven Nat-iaiial Laboratory F-IN A-3014 BO/05/31
B0071H0330 "Hathcmatical Simulation of Sediment (. Contaminant Transport
in Surface Haters." ijoarttrlij rept for Oct-Dec 1979
» Battelle Memorial InstltutUi Pacific Northmest Laboratory FIN
B-3371 79/12/31 2ipp
0007190352 "Evaluation of Docket Files of Terminated License-;,11 monthly
progress rent For Apr 1"?80
HOLDUAY.C F > DECKSDN-H M Oak RiJgB National Laboratory FIN
Of!NL/HASRD-77 ^0/01^30 15pp
B007JB0334 "Forerdating Eleclricitu Demand by State t. by Util Svc
Area." progrBia rept for Maij I9BO
CHERN.W B Oak Ridge National Laboratory FIN B-011&-B
ORNL/ED/EAS-BO/ (30/06/11 7pp
B0071803iil "LHR Thermal Kifdiaulir D-eve 1 opment Program." monttllij
highlight itr far May 1?80
AHUAF.N BrooVhoven Natioiiol Laboratory FIN A-3045 BO/03/31
7pp
B007E 10001 "Mathematical Simulation Sediment t« Containment Transport
in Surface Haters." nuarteilij rent for Jan-Mar 19QD
« Dattelle Memorial InstituLc, Pacific Northuost Laboratory FIN
0-2-271 BO/03/31 34pp
8007210003 "SBC Codt Duvelopnient t< Va 1 I diit i nn. " ninrithlij highlight Itr
tar June 19BO
AOftftWAL. A K , GUPPV.J P Iti on kh aveii National Ldboratory FIN
A-3015 80/06^13 7pp
BOOZalOOOS "HRC Nuclear MastG- Kg t Techhlcal Support In Oevelopme-nt of
Nuclear Waste Form Criteria, ' interim rept for May I'JBO
CiysClNSKl.K S , 5HVtER.K ,J . K.LAMUT, C 0- OrooKhavan National
Laboratory FIN A-315S BO/O5/31 95pp-
0007210007 "NdC Nuclear Waste Mg t Technical Support in Development of
Nuclear Waste Form Criteria. " interim re-pi Fol Apr 1981)
ttlDA.O . DAVIS. R F . MACKENZIF.D R Brookhavnn National Laboratory
FIN A-3158 80/0fl/30
8900713006t
"Effect of Dispersed Condensed Phase on Raleigh-Taylor
Instability of Gas-Liquift Interface. " informal rapt,
Mar 19SO
H03IVNSKI,J a , GINSBERG. T Brookhavnn National Laboratory FIN
A-30S4 BO/03/31 41pp
i30071B0407 "BUR Bloudoun/ECC Program Fifty-Fifth Monthly Proemm
Reptm" Hay 1900
BURNETTE.O W General Elertnc Co NRC-01-76-315 BO/03/31 9Sp p
8007310010 "Evaluation, of LHR Residual Heat nemovjil Under Accident
Conditions." mnuthly liighttyhts far May l^BO
BAR1.R A Broufchaven National Laborntory FIN A-331S BO/OA/05
9pp
80073100Sfl "Thermol Hydraulit LMFBR Uafeti) ti per imentai " monthly
highlight Itr for May ItBQ
OINBBERG.T Brook haven National Laboratory FIN A-30B4 BQ/OS/3
4pp
8007130109 "Quick-Lool; Repl on LOFT Nuclear Elpenment Li-5. "
experiment data presentation rept
REEDER.D L EG&G Idaho, Inr FIN A-A04B EEO-LQFT-5163 BO/OA/30
BOO7210017 "LfflFT Program Division." pretRBt prediction rept for .lune
19BO
KEE.E J . TAYLOR, 0 A . CDNTjlE, K G FQS.Q. tnc F1M A-604B
EGO-LOFT-S172 60/06/3(1 Blpp
S0071602BO Progress Rept 38 for Apr 19SO rE value/Impact statement for
do*imetrij testing program
PLATO, P Michigan, Univ of NRC-0 1-77-1 BO 80/01/30 Bpp
B0072-106OS "LWR In-Plant Meaiurpmenl Program," informal monthly
progress reft for May 19BO
MANBLER. J W EGfcO. Inc. FIN A-60^5 80/04/24 4pp
404
NOWDOCKETED ITEMS
B0073IQ607 "Inwes t 1 jat ion of Ventilation Component Response to Large
Pressure Pulse?.. " informal monthly progress rept for May
19QO
QREQOflY, H S La* Alamos Scientific Laboratory FJM A-702S
80/06/27 3pp
BOO7330Q-15 "LOFT Program Div, " nuick-look rept on LOFT Nuclear
Eipsriment L3-7
MCCREEflV.fl E EGS.G Idano, Inc FIN A-A048 EGG-LOFT --5I92
BO/06/30 64pp
B0072BOJ7I "LOFT Monthly Progress Rept for May 19BO "
KAUFMAN, N C EG&S Idafio. Inc LQ-MR-007 8O/O6/30
114pp
T Deterjriinat i on of Inorganic Constituents in
m Shallow Land Raduaste Disposal Bltsa,"
BQ0733QQ47 "Methnid
Trench Leachatpa
informal rept
SARflER. B L Bro-nthaven National Laborritary
BNL-NUREQ-27591 90/03/31 !J5pp
0OO7220053 "Stress Corrosion Cracking of rtllng ibOO Using Constant
Strain flate Test." informal rept for Mar 19BQ
BULISCHECKpT S . VAN ROOYEN. U Broolhaven National La&oratnry
BNL-NUREO-27759 BO/03/31 24pp
BOQ7SB0174 "Modular Drag Disc Turbine qualification Tests "
FLITTDN.V E EQ&Q Idaho, Inc LTR 141-J09 80/06/06 14pp
B0073B017B "TRAC-P1A Calculations For 200V Hat Leg Break t. 300X Hat Leg
Break Simultaneous W/Rupture of lib Steam Generator Tubea
in PUR "
00LANDER,H A EGS-Q Idaho, Inc FIN A-6017 EOQ-CAAP-319!
9O/06/30 7-lpp
8007230106 "TRAC-Plrt Calculation!! for SOOY.. 0 25 Meter Diameter !. 0 10
Meter Diameter- Cold Leg Brnafc in PWR "
WHCATLEY, P D . DOLANDER, M A EB&G Idaho, Inc FIN A-6047
EOB-CAAP-5190 BO/06/30 90pp
B007290174 "PDF TC-1 Teat, Exp arl ment Safety Analysis "
003SHANN.S R Energy, Dept of, Idaho Operation* Office FIN A-6041
EGQ-TFBP-TR-S03 T)/ 1 0/31 33p p
8007320059 "Acoustic Eitii B s>cn/Fldu Relationships for rnservlce
Monitoring of Nuclear Pressure Ves5e>la." monthly progress
rept for Maij-June I9SO
MUTTON. P H Hattelle Memorial Institute, Pacific N&r thrust
Laboratory FIN H-30BH BO/O7/O7 3Spp
8007290065 "FFIIDA Computer Code f-or Dynamic Longitudinal Response of
Fuel Rod! Subjected to Thermal Transients, " interim rept
SINGH, J N , DOKN.M P . EtJCELMrtM. O P ES&fl Idaho. Inc FIN A-60SO
EOC-CDAP-3173 BO/04/30 66pp
B007E30177 "LOFT MnnthJij Progress Rppt For flpr 19QO "
KAUFMAN.N C EGJ.G Idaho, Inc LO-MR-006 BO/O5/31
116pp
9007230135 "LOFT Small Hreal Test Til ermoc Duple Installation "
FORS.R « EGI.Q Idaho, Inc RE-A-SO-(Jfl4 80/05/28 12pp
B007S3O1?4 "Stress Analijiis of Modified Pulsed Neutron Activation S<js
Downstream Shield Support Structure "
flDSBV. U fi EGS.O Idaho, Int FlE-A-SO-O'l? SO/OS/Ba flBpp
8007H30223 "Site Visits to Elghfc Major Dnsimetru. Procoseors "
PLATO, P . HUDSON, C Mielilgar.. Uni^ of 79/05/31 App
B007230231 "Application of Internal Friction NontfastructivB Evaluatinn
Tachnmue for Detecting Incipient CratHno. of Eijpase Lines fc
Pipes in BUR Piping Bys," Progress Repl i for BQ052i-O63O
» Daedalean AssotJates, Inc NRC-C4-7g-JM3 aO/O7/3I Bpp
B007240257 "Hater Realtor ResearcA Directorste Monthly Rept For May
IDSO "
* Idaho National Engineering Laboratory &0/06/3Q 189pp
8007290190 "Eiperlmental Data Rept for Transient Flow Callbr Fflcillty
Tests irmoi. iiBioa. !• iioaoi "
MAMBACH. J L EQJ.O Idaho, Int U6NRC-P394 BO/06/17 97pp
0007290171 "Measurement of Velocity Vectors in Tuio-Phaae Floiui Ueinfl
Five Kola Stagnation probe "
DEABON.V A , FINCKE, J R EO(,G Idahm Inc USNHC-P394 80/06/06
8007390201 "PBF PR-1 Test Experiment Baf?ti| Analysis "
OOashANN. B a EOaO Idaho, Inc FIN A-&04J EOO-TFBP-SOBO,
80/01/31 23 fp
8007290236 "Cal ciilati ons of Large Cold Leg Break W/Staam Oenerator Tube
Ruptures in PUR using TRAC-P1A Computer Program,"
preliminary assessment rept
LARSON. J R EO&0 Idaho, Itic FIN A-6047 E0Q-CAAP-S1B9 SO/06/30,
B3pp
8007S90233 "Physical Protection of Nuclear Facilities." monthly
progress rept for June I960
ChWPMAN.L D Bandia Loboratorios FIN A-1060 80/O7/09 fipp
800-7890341 "DePioitlon of Parameters for Major Accidents at Waste
Solidification fc Spent Fuel Storage Facilities," monthly
proflrpa* rept for June 19BO
FREDERICK, E J Oat Ridge National Laboratory FIN B-0423
80/07^14 6pp
B007290246 "Decontamination as PrBLursor to Decommi ssloninfl' " monthly
projress rept for June 19BO
PERRIOQ, L D Dattelle Memorial Institute, Pacific Northueit
Labarafcorv FIN B-S3O3 BO/O7/O7 3pp
80Q7B4O294 '•Atfvanced Reactor Safety Analysis Technical Assistance,
Rsaetor Projects/" mnnthlu hlghlijhts for May 1 180
BARI.R A Broothaven National Labor-story FIN A-3000 80/06/05
4pp
B007310181 "Shipping Cask Sabotage Source Term Investigation. " informal
monthly progress rept for Nay 19SO
SCHMIDT, E W Battelle Memurial Institute. Columbus LsboratorieB
FIN B-60IS BO/O6/10 17pp
8007380002 "Actidant Aerosol Charac ter 1 1 ation, " informal monthly
prngres* report For June 1<T9Q
OU2ARSK1 P C Dattella H*moi-ia! Institute, Pacific Northwest
Laooratory FIN B-2237 60/07^13 4pp
S0073I01B3 "Shippina Caolf Sabotage Source Term Investigation." informal
monthly progress rept for Apr 19&0
SCHMIDT.EW flattelle Memorial Institute. Columbus Laboratories
FIN D-60I2 80/05/13 4pp
0007260004 "Shipping Cask Sabotage Source Term Jnvestiflation, " informal
monthly progress rept for June I9fft>
SCHMIDT, E W Qattelle Memnrial Institute, Columbus Laboratories
FIN B-6013 SO/07/O7 lOpp
0O07310IG7 "Experimental Cnttcalitij Data for Code Validation,"
informal monthly progress rept for June 1980
BIERMAN, BR BatteHs Memorial Institute. Pacif i c Northuielt
Laboratory FIN D-2071 80/07/03 3fp
BQQ7SBQOB1 "Sandia Core Melc !< Separate Effects Program," monthly
pragress 1 tr Fpr June 198t>
HERMAN, H Sandia Laboratories 4141/M1.-I3 80/07/1O 7jp
60072S0092 "Orei-fltional ftids for Header Operators." foreion trip rept
KIBMEB.R A Oflfc Ridpe National Laboratory. FIN B-O-13B-9
ORNL /FTR-Q39 BO/OS/ 16 17p p
B0072SO099 "Dosjmetry Si Bi c-transpoi-t Models to Implement; AUflRA- "
quarterly progress rept Api — June 19BO
KDCHER.DC , HCDD«£LL-BDYE(?, RYAN, M T Dak Rudja National
l-aboratorv FIN B-O1FJ8 OBNL/HA8RU-B4 aO/06/30 &pp
"PBF LOC-5B Test Experiment Safety Analysis "
OOSSMANN.6 R EG»,G Idaho, Inc FIN A-AO41 EGe-TFCP-5043
79/11/30 lOpji
HO07310S5I "Technology b Ctistu oF Tarmination Surveys Associated W/
DBCommissioning Nuclear Facilities," monthly progress r«pt
for June 19 BO
DICK80N.lt W , HOLDWAV, C F Dak Ridge National Laboratory FIN
BO/O6/3O 6pp
REVIEW OttP NIG RESEARCH REVIEW GROUPS
BOO7220041 Foruiarils sraphs d e«ecutlve summarv from five recint fir«
• upprBSB-ion tests discussed within i-evitiu group Objective
was to obtain fully developed cable tray fire In donor cable
trau Addl tsstB under consideration w/Halon
FEIT.R Division of Reactor Safety Research 00/07/07 7pp
NONDOCKETED ITEMS
405
POSITION PAPERS BEFORE THE COMMISSION
80070105B9 Transcript ot B00624 public meeting in Hashing ton, DC to
dlicuss ASLB rept on clearance rule Pp 1-47 L Bickuit 791109
memo to Commissioners encl
• Commission 00/06/24 67 pp
BQ07020 3 4 B SEC Y -79 -3 7 1 A
Informs Commission of current status of activities in Ofc
for Analysis & Evaluation of Operational Data Mission
statement, personnel assionmen U, task action plan description
Ii status op selected activities end
HELTEMES.C J Director's Office 79/11/21 Bp p
B0070203A2 SECY-R-74-132
Discusses formation Df reflulatory requirements review
committee Program for controlling ratcheting. charter for
regulatory requirements review committee Si press
announcement end
MUNTZINO.L M Atomic Energy Commission 74/03/05 Ivpp
B007020270 SECY-R-74-099
Discusses regulatory program for mlnimiiing !i controlling
ratcheting Ratcheting can be minimized !, controlled but not
completely eliminated Program will make ratcheting part of
licensing process Program ent 1
HUNT!! NO, L M Atomic Energy Commission 73/1S/19 ISpp
8007070598 SECY-6Q-153
Forwards draft PR notice of proposed rulemaking re revision
of reactor siting criteria d draft Ibrs to PtFlQ Si Congress
Recommends approval
MINOOUE.R B Office of Standards Development. Director BO/03/ 1 9
8007OV0033 SQ,Y-B(1-23HA
Forwards WHSS technical rev
consideration in t on June t jor
fuel t component eiports
SHEA.J R Dfficf of Intern
lp
op ponding Tarapur
.igrams, Director SO/O5/13
— BOO709003S ForuarJs proposed NM5H tcchniCiil revieiu for Commission
c onaiderat ton re proposed einorfcis of fuel l< curnpnnents to
Tarapur
BURNETT, R F Division of Safeguards EJO/O5/12 flpp
B0071O009B SECY-79-399
Informs ConmiSEion of results nf NRC study of generic
financial qualifications i HSUP ?i requests decision on encl
proposed rul emating R&cormnends appToval of Alternative 1 c
b publication of proposed rul eniaV ing in PR
DEMTON.H R Offne of Nuclear Realtor Regulation, Director
79/04/37 a4pp
9007100264 BECY-aO-171
Req.uects Commii^ion comments on proposed legislation to
establish state planning council on radu-aste mgl Major
changes proposed by DDE uiould JIVP council budgetary !>
spe'nding autlioritij Rucommends sending uncl 1 cr to DOE
BTAIGER, C R Office of thp Qenerdl Counsel SO/03/31 3pp
80071 104B4 SCCY-BO-107H
Provides balance of addl info requested re proposed Interim
hydrogen control requirements for small c ontalnments
Advisable tu require inerting of all Mark I !i Marl II
containments pending rulemak ing proceeding
DEMTON.H R Office oF Nuclear Reactor Regulation, Director
BOYQ6/30 7pp
B0070B003d 8ECV~75-429
Discusses procedure by uihich NRC can determine uihether
matters of alleged or suspected criminal violations of laui
should be referred to DOJ Recommends that Inspector ti
Auditor Ofc accept full ruspc-ns ib i 1 i ty
BHAPAR.H K, Office of the Eiecutive Ueoal Director 7S/QB/U
3pp
B00709Q015 BECV-BO-273
Discloses f ina 1 i iati on of emergency planning rule changes*
including consideration of public comments Recommends FR
publication re final rulemating Related documentation enc 1
MINOQUE, R Q Office of Standards Development, Director BO/06/03
H9pp
— 8007090017 NUHEQ-068U
Draft "Environ Assessment Por Effective Changes to 10CFRSO
fc App E of lOCFRSOi Emergency Planning Requirements for
Nuclear Poue-r Plants " Related documentation encl
OTT.W H Division of Biting. Health & Safeguards Standards
BO/06/30 &4pp
— 8007090019 Concurs in proposed final rule on emergency planning,
pending resolution of IE comments Resource impact on NRC
for full implementation of rule must be addressed in
Commission Paper
8TEULO.V Office of Inspection & Enforcement, Office of the
Director aO/05/11 lp
— BO 0709003 I Concurs in sending revised emergency preparedness rule
to Commissioners Supplementary Info section should contain
addl info on technical justification for 15-minute
notification requirement
DENTON.H R Office of Nuclear Reactor Regulation. Director
80/03/16 lp
— 8007090023 Com urs in Final rulemaklng on emergency preparedness
Requirements for implementation of federal . state ti local
gnvt exercises apply to nuclear reactors t< not to operations
licensed by NUBS
DIRCKS.W -J Office of Nuclear Material Safety t, Safeguards
BO/05/ IV lp
— 5007090025 Supports final rule an emergency planning NRC final rule is
consistent uj/proposed FEMA procedures for reviBiu of state
emergency p lans
JETT, 0 Federal Emergency Management Agency BO/04/02 lp
BQQ709QQ2B Transcript of BOO516 open Affirmation Session 80-S3 in
Washington, DC re order in Tat>apur eiport Pp 1-3
* Comroi i » i on 80/og/ 16 4p p
— 8007090030 Informs of correction to SECY-BO-23B re proposed exports of
fuel b components to Tarapur Commission SECY papers cited
are Incorrectly referenced Draft mejooi andum fc order encl
BHEA.J R Office of International" Programs, nirector BO/03/13
I3pp
— BOO7110487 Foruarbfi summary of Pr-obab 1 1 *t it Anolyaia BtaFf vieus on
value of inerting to overd n risk reduction based on 791DO3
presentation before ACRS Subcommittee an TMI-2 Inertlng li-a*
small value in terms of overall risk reduction
DERNEIID.R M Probabilistic Analysis aranch (Pre 7^1030)
HO/06/10 lOpp
— aOD71104E;)3 Disrusces Reliability * Disk Assessment Bra rich evaluation of
relative Impact of inerting Hark I containments Prom
overall rlsli standpoint Inerting t an t (t irinent uouli! not
appear to have significant effect on reducing overall risk
MftTTSOH.R J Division or baFety Technology aOVOS/21? llpp
—6007110498 Forwards "DWfi Porspective on Interim Hydrogen Control
Measures. " as addl info on accident prevention for lUJtB
Substantial hydrogen -genei ation 11 off ec tively prevented
in DWR due to unique inherent ilesicjn features
SHERWOOD, 0 G General Electric Co MFN-04F)-flO BO/O4/31 lp
— SOO7110503 "BWft Prrapectlvo on Interim Hydrogen Control Measures "
* General Electric Co BO/04/15 I9pp
O007110332 SECY-BO-a?O
Submits analgsis of basic legal i &5ue in emerge-ncij planning
rulBmaking NRC has sufficient authorlti| to promulgate rules
premised on Commission judgment ro significance of adequate
emergency plans as essential tu public health ti safety
BICKUlT.t. Office of the Ouncral Counsel BO/M/2-7 I9pp
B007110S4B aECY-79-lOt
Provides Commission in/results of furthur i BVIEIU of extent
that licensing or oth*r regulatorij attions relied DTI WASH-
14 OO No reason e>i&ts to altvr previous recommendations
Synopses of items identified in NRC survey encl
DENTONi H R Office of Mu ti car Reactor Regulation' Director
79/02/09 IMpp
80071 4003& SECY-BO-370A
Provides proposBd changes to FR notice re final rule on
emergency preparedness in rofiponse lo CommisE i on directive
from BOQ&1B meetinn Forwards r-pp lacemenfc pages to HCCY-aO-
275
M1NOQUE. R H OfftCE of Standards Development. Director
lOpp
— 8007140059 SELV-8U-273
Replacemont Pages 31 . 29. 25a. BO, 31 . ">la & 47 modifying FR
notice d flnjl rule chanijts re emurgencij prflparcdtiesa
« Office ihf atandards Dovfr 1 ofimenti Director 00/0(j/23 7pp
6007140131 BECY-79-4H1
Req.uestsi Cnirimi 61 i on approval of FR notice Inviting public.
coflimsnt on NRf value-impact guidelines RBLoirmenils approvnl
Draft FB notice, draft Itr ttj (.(ingress !< drnft public
announcement enc 1
HALLER.N H Offitb oF Managemi-nl »nd PrOB'sti Auulysis 79/07/02
33pp
406
NQNDOCKETED ITEMS
, -77-jri3A for
tjgreefl to adopt guidelines
p-inn Jt t analysis
e t-(iniission 7B/01/33
ry of the Coimissmn 79/01/10
B007170244 SECY-BQ-J17
Forwards Eiecutive Branch rosponses rv ttao pending Biport
license applications for Taiwan
SHEA. J n QffiiE of International PrDyroniB, Director HO/O7/GI
lp
— 8007170251 Forwards Executive Branch an>i I us Is i-e Heat 1 ri[phou»«
application fnr license to effort fl, BID hg U~ajS. contained
in 335, BSS kg I*, to Taiuian
NOSEN2O, L. y State, Dept of Bureau of Oceans & Internal! Envivtn
& Scientific Affairs BO/Oti/12 13pp
—6D07I40I35 D»"i"s
inpor tunce of Value/inpact osBessmente in ms
F. otter itatutunj nandgtesi Recant value/
are upll prepared dl though there is room
ADDERS U f, uc-mssion 7(./0-l/l5 lp
pline? • Contains nunerous NBC memoa
delmes reiiftpd tarients 'i s^Vpral brief
elinss
7/11 /JI I91pp
—9007140139 'Va!u*-|i«pj£t
cotfVAien t iri'j en ^ifidelm
ItRC rapt; rf gmdelins
— H007I7G23S Application by. West inghouse For license to eiport U dioildi
sintered pel lets, encgpswl ated in sealed fuel rods &
assembled Into fuel aaaembl ies, to Taiuian
• Westinghouse Electric Corp ICS-7H23 7B/11/J7 lp
000717D3S3 5ECV-BO-31B
Recommends approval of proposer! license t» allow Hi asho-lvua i
American Corp to eipnrt 17 162 Kg U fc 44 003 Kg U~S3t tn
J»pan
SHEfl, J R pfficn of International Programs, Director QO/07/O1
B007140539 SECt-«JO- Ml
R<i!U»sit, i-fvieui at proposed isenanre o» license for GE to
Biport todipcinfnt* tn Finland E«uipment destined for country
not previou'.lu authDruetf In eiport per nuclear
NQnp'Oliferqtion Act of 19/g RBtommends issuance
SHSA..JR Office or International Prograi.5. Director BO/O6/2O
— B007H05-la Forwards app 1 ,c9t ion *u)- license to e,port components to
Finland Ltr of assurance f. draft license end
WILSON fl D General Electric f o BDH-80013 BO/01/30 3pp
80071*0553 SECf-BQ-2'J4
Informs of e,e(atut Branch response on pending license For
Union Carbide Corp to eiport U-235 to France
SHEA.J R OffirB of International Prograns director BO/06/1S
•t
.
Lltenie should b» isiued Llr of BSiUrane end
B007MQ376 SECV-BO-1S3A
Formats rev.s** schedule for proposed ruiEmak.ng on reactor
Siting DlsCus^es need for Di-ejtet de i iberat.cm
NIMW.RB 0»,c. 0- BsMd(ra, D.v..oP™.r D,r«tDr SO
80071SD05D SEC/-BD-39H
jr:rr.;:*r:?I^:;;::»vir»;»j«-':;/:e't;»'''--
«'««t,« Branch ,P.,,PI Burning H/0 att,on S5 Dp^spl) to
SSii»U'ftV''i'tiC:V1'f"ftlc" 'nVOlvefl Draft ItP enc!
aHEA.Jft (,,„„ of Intfrn3tlonal Pr09rams, Director BD/OA/1
B0071S0054 86Cy-ao-207
^H Off,ce of int.rnstl0na, Program, Dlr6t(OP
— BQ07170534 License for NiBSho-Iiuai American Corp to Biport 14 Ot>3 kg
U-23S, contained in 47 165 fij) u, to Japan
PETERSQN.MR Office of International Progr^ma, Director
00/05/01 Bpp
8007170597 Unoffical transcript of SQQ703 public mBEtlnn rt NRG
response to panel presentations nn emergency planning in
Washington, DC Pp 1-3Q
* Commission 80/07/03 60|>p
— B007170604 SECY-BQ-37SB
Proposes mads to FR (, final rule changes on sn>org«ncg
preparedness submitted For Commission approval in
SECV-80-275 Changes do not effect coat entlmates H»plat«*iBnt
pages end
HINOGUE.R B Clffice of Standards Development, Director BQJ07/03
23pp
H007190004 SECv-ao~l32E
Discusses approval of reloaee of Kr-BS From reactor bldg
atmoiphere by controlled purging fiecnmrnenrta authori lallon
for contrDllerf purging Draft negative declaration re puroino
t press release nncl v * *
60/05/30 " ll?pffiCB °* NuclDar ""ttor Regulation. Director
B0072I0009 SECV-BO-316
tne^™!"l
e» '.,*? n
e.ecutive Di
n,nu«lMP, Inr
«" norwards
ft« .
° . "! U'eTlHchei1 *«• " 3»-t
ianch views re proposoJ B»p0rt
OFPice Df International PTogra-ns. Director flO/O7/Ol
rd, B'«utlv« "ranch position re TranBnuc Uor , Inc fr
T r1,"11 CDrP fl"P""t''""' 'or licenses to
L,cBnS..s ohnuid he candi tloned ..
SO/OA,24
Licen,enfor Transnuc lear, Inc to ,(p0rt 39 077 J«g U. ,nr
fl tTt
BO07 150069 SECV-BO-aOe,
Inform* »f propose* retransfer
an
»w
Olrector
ion
• rt- «?IM' ° di5CusS proposed flre protection
rule for faculties operating prior to 790101 pBr BECY-PO-
HOVLE.J C Dffite of the Secretary of the CDmmiss.on BO/06/ 1 9
BO/06/17
^
B007330179 SECV-BO-2fl2
ind^rf *! "T Kennedy B00313 reiluest for info re
i? .' »;»"* do r^r^r^1?3 9roup B.i.t.ne. ;; indUstrU-
SE£T 9 ! r •* ^"^".""v..':"^^:'"-* -"*{
"
BO/07/H
NONDOCKETED ITEMS
407
— BDO729COI9 SECY-BO-374
Recommends approval of publication of regulation! fs
implementation of IAEA requirements for licensee;. Draft FR
notice & press release & summary Bf comments end
MINOGUE.H B Office of Standards Development, Director SHEA. J R
Office of International Programs, Director CIRCUS. W J Office
of Nuclear Material Safety t. Safeguards BO/O6/02 137pp
BQQ723O176 SfcCY-BO-97B
Informs Commission of current status of resources t.
projected end-uf-yr position Mo financial plan cnanges Being
rcc omrnenderi. pend ing several decisions. mo st significantly.
Congressional action an NRC FVBO supplemental
DARFlY.l. W Office of the Controller GO/O6/O4 3pp
— GOO729QIBQ "FVBO Mid~Yr Resource Revi
» Division Df Buduet EIO/O1/3D
SECV-BO~30a
Adviifla of near-signature status of NUC info eiihanga
arrangement u/Japan Nuclear Safety Bureau I, Agency of
Natural Resources !< Energy Arrangement uill be signed in
Japanese & English Tfntural authenti c itg verified D Dot 13
SHEA. J R Office of International Programs, Director BH/O6/34
14pp
8007380086 SECY-80-313
Informs of Ciecutive Branch position re application by DDE
to eipnrt mixed ond& fuel pins to United Kingdom flBcoramBHOs
1 Icense be granted
SHEA. J Fl Office of International Programs. Director BO/Oi/3O
IP
BOO7290QQ3 5ECY-BQ-29 1
Recommends that ComnUssion approve notice of dental of
Petition fnr Rulemahing 2-9 Plied bij Union of Concerned
Bctantists tt Natural Resources DEfenGB Council Draft
•documentation enc 1
BHAPAR.H K Office of the Executive Legal Director 13FR4Bi2l
BO/06/17 15pp
— HQ07290005 Forwards petition for rulemakina 2-8 b camments on proposed
ruin 10CFR21
RO I SHAN, A Z Natural Resources Defense Council 43FR4B&21 SI
71/O3/03 Ip
Petition for rultmaking on amend to 10CFR2l,rB exempting
commercial grade component suppliers from regulation'
submitted ds commiml Safety significance unfaundDd ft
inconsistent ui/pao-t NRC activities
PQUUARD.R Union of Concerned Scientists ROISMAN.A Z Natural
Resources Defense Council 43FR4B6BI 21 79/03/03 14pp
8007390033 SECY-BQ-2?1?
Recommends that Commission approve <noil to portion of
security clearance prncos-a ing policy to permit certt F i cali-on
of other federal agency security clearances to serve as
basic for NRC (. erti fi cations Security agreements ui/DOE ent 1
DDNOQHUE.D J DfFico of Administration 8Q/0&/19 |3pa
80O727002B Draft Commission papet re approval of FR publication
of "Ouide for Evaluation of Agreement State Radiatldn
Control Programs. " as proposed pnlicy statement u/r^quest
for comments Draft notice !• guide enc 1
KERFl, Q U Office of State Programs. Director DIRCKS.VJ J Office
of tho Executive Director for- Operations BO/O6/O2 3Bp p
HOO70aOO99 AcV receipt of B0i)4=b Itr inquesting NfIC aasistsnce at MD
Commisfiion nil IrHergu^ ei nrac n t o 3 CDDPPT i.tior SOOdOS meeting
Witness who miLl bi- prcpsrcrt tD antiiiur questions re spent
fuel LH 1 1 be provided J Cl»,i3ei>r ui 1 1 accompany uitne'ss
RYAN.R G OfPiLe nF State f'T tie) J ains, Directot BO/O5J31 Ip
— BOQ7O2O3:3a Reque
flnnapol I a. MD on nut le
quest! one enc 1
EASTER, J H Harijland,
,t BOYO4/2B Sfp
BDO7OS0113 «cV rereipt of tiOO5^1 Itr nip-retsing concern re future rolt
of Off of State Programs NftL lenwiiri' committed to preserving
DinCKS.W J Office of In e E.l'C uti vt. Director (or Operation*
BO/Ot/12 Ip
5007(120156 Forwards, info requested re 1 9LjO Houston Gamma Ray Co
incident Release limit for contamination at that time uas
those, used today
KEHfl. Q H Office of State Pronrrtras, Director bfWECA 80/06/11
IP
B007O303I6 Discusses Div of nines Fi Gpjlojij fault evaltiatiOTi program
for LlvermorD Valley Preliminary •special study icme maps
mill be prepared by DIO70I t. fjult evaluation repti will be
i59iieiJ Supporting d ocumentat i un enc 1
HABT.E W California. State of 1 fc52t SO/O&/04 I3pp
9007020690 Confums Schneider discussion, u/GA Christianson of ND Dept
of li&alth re NRC TU/ieu nf radiation control program !i Tmtes
adequacy of prugram tu protect hcaltli ?i safety
Improvprnents re written onf ore tment- proceduTos recommended
HYAN.IJ G Offite nf State Proarams-, Ciractor BO/O&/1I 13pp
BOO7OSO&19 ffesponds to H005£<? Itr T&c,uMting info re- U milling
operati-ons !i NfiC Agreoment State progrnm PTOViUes addr-sss
for obtaining ilraft GE1S Forwards NURtQ-0511 ^ broctiur*
re Agreement State program H/ a eucls
KERR, G W Office of State Programi.. Director 3rt/CQ 80/06/11
app
Q007O2O76ii Informs, tlist under ^cttion P74 of Atomic Eneroij ftct.NRC tr,
author! i pd to transfer to s t ates. thrciug In dgreeoien t, somo
regulatory authnntij over byproduct source Jv "iNM TuiEnty-four
atates have compatible progi ams
3 Off lie "f Strite Pi og rams, Diieitc-r 90/Oi>/19 2pp
3007030147 Trariscriiit uf 900626 public rapeting. u/repreaentat ives of
Conference of Radiation Contrrl Profiram Directors re
Agreement Statci, program m Wash ingtai, DC Pp 1-19 Morning
session Relatt-t! c orrcs-pondencp PITL]
* Commission 8O/0&/P6 flOji p
H00707O01(> TTanscrlnt of 9006^6 publit meeting u/ i ndu^trij, s tflte !< local
?i special Interest griiup [ijnel>> un emerqoncy planning f-
preparadnes'. rulemaking t' NRv. respcritc Pp 1-131 A*tflinoon
session Related atatementc *- c or rpsp nnrl ence encl
» Commission BO/Ofa/3"i ACOpp
Discusses proposed criteria revisions Poi- evaluation of
agreement states Fundamental issues requiring resolution
include ability of agreement states to bring proper
technical skills to beer on radiological issues
D1RCK9.W J Division af Safeguards UO/OS/33 Spp
3TATE PROD STATE PROGRAMS
9O0701OO39 Forwards specific comments !c recomm end ot ions re pro-gram for
control of agrcnment matla Program adequate to protect
health t< safety UJ/Bcme improvemenL suggested Requests revleu
& tomments on rocommendat i ons
KERRtO W Office of State Programs* Director 00/0&/11 4pp
BOO701O120 Ack receipt of 300602 Itr tn JM Hcmlri e, prai gtng Ofc of
State Programs past efforts t< expressing concerns re Future
rale Close working relations ui/stateii uii 1 1 be- preservod
DIRCKS, W J Office of the Eierutive Director fur Djeratlon*
BO/06/17 Ip
— 8007010133 Praises Ofc of S+»te Programs past efforts
concerns re Future rolo
MUELLER, E W Alaslia, State of BO/Ot/OB Ip
B007J1O165 Toruards list of1 >st,ilp billh not reieived Requests tb-nt
conies b* f orui.tr dnd
QRAMBAU.G OffiEP of State programs. Director (!0/O(.^33 Ip
B007I1O.J77 Informs Butcommi ttx B un Nuclear Regulation of status of
Agreement State roqulatory iirngr.iins Prngram-s in .ill 25
states dutiirnined ndyquale foi CV79 =ii gut t it firtt proaram
deflciencicb found in Crt ^ FL
AHEftRNE. J F Commission il'j/dd/?* ^pp
— B0071103a^ Infurma Subcamnii t tee c-n Environ Energy S- Natural n&5Ou
of status of Agreement tit.ile rcgulntory program Programs
in all 25 states determined adequate FOT CV/^ Slunificant
program dp f ir i enc it 3 fouiid in CA !< TL
AHEABNE. J F Commission BO/06/,'4 i'pp
— BO0711113U7 Infurmt Suhcommi ttec on Fivergy ft Envirun of status of
Agreemunt State regulator progrrfms Programs in all 35
states detPTnnmcU adequatp for CV"? Si^nifiiiiiit (irogrsm
defictoncieE fotind In CA f< 1-1
AHEARNE..I F (. ommiiBion t)i»'Od/p.| ?pn
408
NONDOCKETED ITEMS
— B007I1039J Inforr-i-, Subcommittee on Energy ti Power of status of
Agreement State regulatory programs Programs in all 25
deficiencies found ,„
AHEABNE, J F Comm ssi
2pp
— 8007110395 Discusses statijs Of Agreement State regulatory programs
Programs in all £5 states determined adequate for CV79
Significant program deficiencies Found in CA !, Ft.
RVAN.R G Office of Management and Program Analysis BO/Ofc/19
2pp
— B007210267 Contract "Environ Monitoring Program lu/StatD of NY, "
awarded to State of NV
LANAHAN, M P New Vom. 8tate of MORTON, ft V Research Contract*
Branch FIN D-5IO9 Nfir-03-aO-27l BO/01/OI 16pp
BOQ7230735 Ac k receipt of ODQ512 Itr re progress in cooperative effort*
to reduce packaging & transport problems Full time iriap
coverage at Bcatty should be discontinued Contract re
transportation surveillance mill be forwarded shortly
AHEAflNE.J F Commission BQ/O6/1S IP
800714056" ForuaTds consents
control program
KEfifl.O U Office of State Programs, Direct
ommendations on Stjts of NC radiation
BO/04/27 3pp
"B00723Q739 Advises that full-time NRC inspector mill no longer bv
needed at Heattij.Nv' waste disposal site State mill provide
appropriate insp surveillance as of BOQ601
LIST,/) Nevada, State of 80/05/12 lp
8007150044 fiesiicnds to 8003^'j Itr by forwarding marled-up rept on state
transportation surveillance program 6 updated versions of
Apps I fc II Suggests SOO70B-11 meeting to distuss approach
& p Ian of Action
RYAN, R £ Office of State Programs. Director BO/06/24 34pp
S0071702J4 Discusses results of NRC revieu of state radiation control
program Program foi regulation of agreement matl adequate to
protect public health f. safety ft compatible u/Comini *sion
program Full-time prof should be hired
RVAN.R G Office of State Programs, Director 80/06/27 Spp
8007170254 Confirms info provided in 600617 telcon in response tP
BOO611 Itr Responsibility for mgt of training programs for
state & local emergency planning (. response personnel
transferred from NRC to FEMA
RYAN.R G Office of State Programs, Director BO/07/02 2pp
SOO717Q377 Requests assistance in training local lau enforcement,
emergency response Si health personnel Cortland County
Resolution 106 enc 1
FEUSB. J V MBU y0rk, state of 80/06/11 Spp
B007180017 Expresses appreciation For 600526 Itr to NRC re future role
of Ofc of State Pragrans 'Aeus eipvasses in Iti uill be
carefully considered in any reorganization uihlch may affect
QFc Of State Programs
D1RCKS.W J Office of the E<ecutive Director for tlnBraHnn.
BO/Ofl/04 lp irector Operations
— SQ07IS0023 Eipresses concern re future role of Ofc of State Programs
Single point of contact which can morn effectively u/all
levels of NRC is vital Contact should have sufficient status
to deal directly u/Conmi ssioners J, Eiecutive Director
HVERS, I L Alabama, State of BO/05/26 lp
3007350301 Advisee that F Voung. will be MilC reoreaontat 1 vo to Btotr
Planning Council meetings beginning w/000731 mEeting
R¥AN,R 0 Office of State Programs, Director 00/07/09 lp
6007250326 Recommends that written procedUreE be developed for
escalated enforcement action Written procedures are
necessary so that state can respond adequately & in timely
manner to Incidents involving, agreement mails
RYAN:R 0 Of fits of Stato Programs. Director 80/O7/03 Spp
B00735D639 Confirms comments made at B00603-0t regulatory program
revisu Submits addl comments (, rocommendatlons designed to
improve '< strengthen radioactive matls program
KERR.Q W Office of State Programs, Director BA/JOL BO/07/O2
3pp
B0072BOI62 Ac* receipt of BOOS2? 1 tr inpressing concern re Future ml*
of Ofc of State Programs MRC rpmains committed bo prescrvinj
cla»e worllng volations u/=,tatBs !, CmiPerentt
AHEARNE.J F Commission BO/06/19 lp
— -B0073SOI70 Forwards resolution requesting Commission proceed u/cautlon
in deliberation !< actions re reargani lation of NrtC Off of
State Programs has provided agreement states u/irifo vital to
programs !i improved NRG/state relations
PARROTT.H U Conference of Radiation Control Program Directors,
Inc BO/05/23 3pp
S007S90038 Draft Commission paper re approval of FR publication
of "Oulde For Evaluation of Agreement State Radiation
Control Programs," as proposed policy statement ui/requost
for comments Draft notice ft guide end
HERR.O H Office of State Programs, Director Dl[tCK3,H J Of Fit*
of the Eiecutive Director for Operations BO/OA/02 3Bnp
B0071B002I Forwards Nuclear Engineering Co. Inc 8Q04Q4 application For
renewal of State of W rad.oact.ve mat! Ucense at Beattu
lou level waste disposal site State at NV has requested NRC
comment
8007180214 Ack receipt of BWW>4 Itr e, press, ng concern about future
role of Ofc of State Programs vieus e, pressed will be
D?nr«c i<,"nn«"'M '" 3ni) P"ture ""Banijat.on
B0/o5/o" ,,°"'" °f t)1B fc'"u"^ Oirecto- for Operations
unit in nor =S cnntlnuatllln of Otc of State Programs as viable
unit in NRC organi lational structure Ofc of State Programs
has consistently provided readily accessible source pf
technical, legal (, policy advice
COHEN..) C Ne« Vorl State of BO/06/24 4pp
B007IB05Sa Ack r-ce.pt of BOOS2I Hi- ^/schedule .ions for
cvni°vmp v1 emer9enciJ response operations COL i for
r?:.^n.^?,::_S DPtl0n '"•••"•"I"* ^ ^o has runding
RYAN R 6
Office of State Programs, Director B0/07/OI lp
BO/ 07/07 lp
KERR.O U flff.ce of atate Pr0!trams Director
~ B007290029 Discusnes proposed criteria rBvlsions for evaluation of
agreement states Fundamental issues requiring resolution
include ability of agreement states to bring proper
technical skills to bear on radiological IBSUBB
DIRCHB.W J Division of Safeguards BO/03/23 Spp
B00729004I Forwards third quarterly transportation aurveilUnce
progress rept, first yr, suomi tted by State of W.A under
contract w/DOT b NRC
DFfice of Stato Programs, Dii-ector QO/O7/16 15pp
irter, first yr, transportation contrai
=09 W/o encl
1- Washington, Btate of BO/07/09 lp
ao0729DDhO Foruards third quarterly transportation survnill-nce
progress r.pt. third yr, subml tied by State oF Ml under
contract w/NRC t, DOT covering B0030I-053I
JANINEK.fi nffice of Stale Programs, Director BO/07/li 19pp
HO/06/30 lp
T,^ :"ft tOT thiri quflrtBr oe transportation contract,
AH shipments accepted No inspector onslte
during m* of BOOS19
STRONO.TR Washington, State of BD/07/09 3pp
REIZEN,MS Michigan, State of NRC-06-77-031
""anrh F1NB-5
NRC-03-90-271
AHEARNE, J F
mply
Commi EE! on
by B111I1
BO/06/13
3pp
NONDOCKETED ITEMS
409
— B-Q07270351? Discusses U mill regulations that should be adopted to
triable State of MM to meet requirements of UMTRCA State
*hould take action on difference* between F1TAX EC Environ
Improvement Div recommendations as diacuased in enc 1
H Office of State Programs, Director BO/O3/20 4pp
&00730O06B flck receipt of Itr eipreBSlnii appreciation for NRC
• iiiatariEB In hearing last fall Advises oF Commissioner
Inability to attend 55EB meeting
KENNEDY, R T Commission BQ/Q»/Ob If
— BQQ73CQ074 Eipretses appreciation fur Commission assistance on
eintrgancij radiological planning. environ monitoring S.
transportation hearings Final rapt available from hearings
CAHTEtlpA fl South Carolina. Stats of BO/Q4/24 tp
BDO731O295 Updated list of state liaison officers
• QfFice of State Programs. Director BO/O7/31 llpp
VENDOR REPORTS AND RELATED CORRESPONDENCE
BOQ7O10S36 Ren,ueats reply to Q00331 inqulpg re statue of technical
nvtvui of topical rept on Foi Mnulett rebar cDUpl»r«
submitted 7B0322 Coupler approved by everif major code
writing agency
FQX.C J Foi Industries 80/06/25 Ip
Q007O10349 Notifies that info requested in NRC 000610 Itr will ba
Foruai-dod on 8007 IB Affirmation encl
DAHMIT:EL,R w General Electric CD eo/ofc/aa 2pp
B007OI0307 Fltquests participation at Commission BOOAHfc rat t tin 9 an
hydros »n control Substantial hydrogen generation effectively
prevented in HHR due to design features
6HERWQOD,G 0 General Electric Co 80/07/01 Ip
BQQ70ZOQB9 Forwards status oF TMI Bui In tin* t> Orders Task Force wort
Distunes B&U operating plant response to IE Dulletlns
79-03, 79-OSA. 79-09B (, 79-DSC
HELTEHEB.C J TMI-a Bulletins & Drders IED-79-03 79/O9/13 8pp
— BOO70BOO?3 Forwards summarg of 7*JO910 meeting re status nF IE Bulletins
79-OfiB k 7"7-OtC b jeneric l&sues pertaining to C-E
dtilgnvd reactan
VILLALVA, I, TMI-S Dullitins Ic Orders lED-T'J-O&D 79/09/13
7pp
GOO 7O2O-322 Request! aridl info to complete review of CE-l-A. "Camm Ed QA
Program, " Revision 11 Response requested by BO0627
HAASS, M P Quality Assovance Qrancl> CE-l-A.R 11 BO/06/ 11 Spy
S007O2OS90 Forwards WCAP-974B t, UCAP-7741?, "WeBtinghnuso Owners Group
Aiuniitrlc LOCA Load Eval uatlon, Phase C " Propri etary
vorsion withheld (Ref 10CFR3 790) Application tar uitholdlng
pTDprietarij info end
ANDEftBQNjT M UvstinghousR ElBetric Corp . Niulnar Energy Bystens
N3-TMA-2afifa BO/06/30 llpp
"Hestinjhousft Dtunera Oroup rtaammEtTic LOCA Load Evaluation.
Ptiai* Ci " nDn-propvietari) version
CAMPBELL, T E Ueitlnshouse Eletti-ic. Corp , Nuclear Energy Sgstun*
8007020641 Forwards HCAP 95SB, Revl E ton I tc WCAP 9970, Revision 1,
"Hichanlitlc Fracture Evaluation of Reactor Coolant Pipe
Containing Postulated Clrcurnf erentla I ThroujPs-Wall Crack "
Affidavit encl Proprlctarg r»pt withheld. (r»f lOCF«a 7VO)
ANDERaQM.T H Mestinahouse -Clectrit Corp NS-TMA-H365 60/
lift
HCAP-9970 Rl
"Michaniitie Fracture Evaluatidn o* Reactor Coolant Pipe
Containing Postulated Circumf erenfcial TArough-Uall Crack."
Rtviiion i. nonproprietary version
PftLUBAhY.S S , HARTMANN.A J , ANDERSONS M Westing hnusp ElEC
Corp aO/06/30 SOOpp
BOO7tta0724 Notification of BOO&H7 meeting w/We etlnghousB S. NA1 in
BethmJaiMD to discusi HCAP-9500 review Ws«tinghoua« will
preunt 8«itiDn 1 4 design of 17 x 17 opttmiied fuel as
d*%cribei| m repl
PH1LL1P8.L E Core Performance Brand* 60/06/33 2pp
BOO703032O Pravides ttcitus t ep t/
Bvalgations of BS>W licensee rp^ponse
79-03A, 79-D5B t< 79-05C
CAPRA.R A TM1-3 Dulletins S, DrdEti
u 1 p For issuance of NttC
es t-o IE Bulletins 7<7-O5.
E10 0703(KJ5*f Advises that C rtithelEDn c onctrns. ortgina I ly addressed t a
C-E Sys BO deiigna. should be Fui-uardeil td BiM Re*pons?a
necessaTi| bij 791011 For NUREG-O965 ulriteup
HOS2TOC2V, 2 It TMl-a BullPtins li Orders TifQI/Ob 3pp
000707010(1. GAl'TR-lOd R3ft
Correttions to Feb 1"9BO QAt -TR- lOtn Revision 3A. "QA Program
for Nuclear Power Plants "
* Gilbert/Commonwealth Cos BO/Ofc/23 Ip
Q00707D290 Ack rereipt Of NRC 500630 Itr re corporate organisation WP
Rauach has decn named director of project support & OA diva
b DJ HcCormiclt is manager of corporate OA Corporate
operations manual, Part 11 - Organi latkon enc 1
HENDRICKSON, T Burns & Roe Co SO/Q&/3D 9pp
6O0708024a Notifies that WestinghouBB studij. re inadequate core cooling
conditions will be submitted tij mid-Jkil 1930
flEED.C Commoniuealth Eoi son Co 0,6-35 BO/07/01 Ip
a007090S7-4 Forwards input For 1979 Fuel p or for man i c annual r*pt
including table summary of C-E -fuel irradiated &/ar
diicharged in 197? t< "Pert oTmant e of C-E Piral in Opprattns
PUR s "
BCHGRER.A E C-E Pouer Systems LD-30-O3? BO/07/O1 SDP
"Performance op C-E Fuel in Operating PWF?s "
ANDREWS, M G . Fi1EEDUHN.il H . M DHL BEN. U D C~E Pouer Systems
79/03/OE 3pp
fl0070B03k2 Slffsponds to NRC T-eqvest for info re "Fuel Performance Annual
Hept " Includes info re -current D&M designifuel e«rFarmance
proflrama underway in 1979 fc nummary of BtiW fiinl performance
for 1979
TAYLOR, O H Dabtock & Wilcoi Co BO/07/O3 I5pp
00070901'J-O Forurarils "Effects of Asymmetric LOCA Loadings. Phase H
Analyst* " Flept updates "Effects nf AsymmetMt LOCA
Lnadnngftf Phase 11 Statin." submitted Fv\> 1900
H Qabcock K WiUot Co EEC-LB6 BO/07/01 Ip
— B00709O301 HftW-lfrSk
"Effects oF Asgmmetric LOCA Loailinga. Plia&u II ftnaljsis "
ALLEN. R E , ANTDUM.lt L , AU-YANG.h K Pabcock t, Uilcoi Co
BO/07/31 BOOpp
BOO709031iO Foruiards OE rep t, MEDE-21757-P. "Caorso Safety Relteif Valvu
Discharge Tests Phase' 2 7&*t Rept " Test rapt utthhe'
(ref 10CFR3 79O>
BUCHHOLZ.R H General Electric Co RHH-05I-30 8(- 'O3 Spp
00071O007I5 Notification of B0052B mee'ting u/C-E Diners group in
BatheEda. MD to discuss group obligations for instrumentation
re c arc cao 1 ing
PHILLIPS, L Core Performance Branch BO/C3/23 lp
000710O210 Forwards Amend I to CENPD-1O3, "C-E Methods for Loss of
Flam Analysis "
BCHEHER.A E Combustion EnameerinH, Int LD-(iO-0-33 60/06/24
— B0071002ia CENFD-1B3 Rl
"C-E Methods For Lois of Hou Analijals," Amend 1
» Camfcustlon Eng inear i n.g. Inc LD-BG-035 80/0^/30
I2pp
8O07lOOai9 Foruards "Class IE Qualification -
InstT-uraEntaimn. " Rffvision l.Jul 19BO
SCHERER.A E C-E Power Systems LD-BO-01O
(lualiFicolion of Clas% IE
— H007100220 CtNPD-235 01
"Class IE dual iHcatlnn - Qual l Ftcati on of Class IE
Instrumentation." Revision l.Jul 19SO
» C-E Poimr BijEtem* BU/07/ai BTpp
fi007100253 Foruaros Revision 9 to WCAP-B1B3. "Operational E«pBrlKnce
u/Hestirighoune Cares (up to 791331) "
AMDERSOH.T M Wasting house Electric Curp ELW-DO-OOo SO/Ot/31
8007030211 Discusses concerns re requirement for immediate trip of
reactor coolant pumps In event oP reactor trip 1< safetv
injection initiation camtd by low jn-es»upe condition
.HILBONiB A TMI-2 Dulletlnfi I. Orders 1EB-79-OSC 7^/10/09 5pp
410
NOIMDOCKETED ITEMS
rtP-BltI3 R9
Revision 9 to "Operational Eiperience tuj-Mest i jiohouSB Cores
(up to 771231 I "
SKARITKA,J , JDffil.J A WestinghoUHB Electric Corp 80/04/30
3opp
H007I102IS Forwards "Gadolinla Fuel Properties For LWR Fuel 3afetu.
Evaluation " ffept withheld fref IQCFrtS 79O1 Affidavit encl
OUSLEV.O F Eiton Nuclear Co . ] nc (subs of Euon Corp )
QFQ 09? BO BO/06/0* 4pp
B007I40426 Forwards jddl Copies of NEDQ-25224, "(JESSAR As*«i»«»nt Hept.
Revi*u of BWfl/b PrHtBCtlon In-Depth For Transient & Accident
Events "
BUCHHQLZ. fl H Genera] Electric Cn OHB-O49-00 BO/06/30 lp
8007110630 Forwards topical pept ovaJuatlon of BAU-101B3. "Nuelrar
Applications Software Package. " ra nutlear analysis for
reactor cares
M1I.LER.J R Standard! latian & Special Projects Branch BO'Oo/19
8007110233 Forwards Hevision* 1-"P ft t -NP tn CENP&-1 53-P
"Evaluation of Uncertainty 111 Nuclear- Pouc-r Pealing
Measured by Sel f Pouiemdi Ft x ed ln-Cnre Detection Sijs "
Pavilion 1-1* luitnhtftd Inn1 IOCFR2 79O1 . Affidavit »ncl
SCHEftEHi A C Combustion Englneoi-lnj , Jnc [_D-80~02fl
--BOQ711024n CENfO-153-fJP Fll
"Evaluation of Uncertainty tn Nuclear- Pousr Peaking
Heaturirtl by Self f ow<fr6>d. Fl tea In-Core Detection Sys. "
Revision 1-NP noriprppr ID tari| version
TERNEV-H 0 , CrtUHP.M U Combustion Engineering. In«
BD07IIO341 Forwards XfJ-NF -ao-l7(P ) . Vol » 1 , 2, 9A, 2D, J, 3, X(J-WF-79~39(P),
XM-NF-52.XP) !< XN-HF-/9-7I (P). (levisjon 1 Reptt withheld
(re* IOCFR2 7fOI
OWauEY-0 F EjfiDH Nuclear Co . Inc (SUDS of E»jeon Cprp )
CFO 074 30 EO/OS/aO- 3pji
S0071104')9 Requests rpsponss to BDC! NRC potttion re CE-l-fl.
QA Pr-osram for Nutlear Seneroting Btatio.ni " Vrs of
Bi^BrieneH pequirert COT poBltlon of manager of OA not
de*cr f bed
HMSG. W P aualltj Assurance Branch aO/O3/oa 2pp
"Coram El)
ao07JlO350 NotifiLatlon pf COOAI2 (nBBt-inj tn/OE DWR owners jraup to
discuss current planj of group to satisfy ua requlTEment'S
for reliof valve testing
i J T Oparatinj Fleflctora AftSHBsment Branch. BO/OA/03 2pp
S00711097B MotifliiB at NRt ap|iro.vaJ of XN-NF-1A. Hevision 3. "QA
Program Topical Rep C far Nuclear Fuel Design & Fabrication "
Program rnaHj be Imp 1 orafinte-il u|mn issuance of revision
HAASS, UP OuaJltij Aasurance llranch BO /O 6/37 |p
B007lfl03flii Forwards "EmorgBnc ^ Procodurfl 0-Lrid*] IriEs" for BUR owners
group. oar NUR[:e-Q57B, Requirement 319 BoB-cr i p tian of
ho in analyses of NEDO-3470B J. emergency procedure guideline*
apply to all FSAtl Chapter 13 pvontt forthcoming
B1HTHI ItJL Z . B M Oofieral Electric Cfl MFN-1 17-0O BO/Oi/30 flOpp
B0071403b7 Forwards aupplfl to eqgipdieirt qua I i F i Cfl 1 1 on **st rspt«.
rgviteit dn-u i jiment nuaU f itatl on data pacfcaD^' aiPP licatjon
for ui thholiliny ti affidavit, r* comwi tman ts made in
WCAP-05B7
AWDEflSUN, T (1 Weatinghoute Electric Cor-p H3-1HA-SS60 GO/06/16
8007140373 eaOP-EUe-15 H2
"((•corders Post-Ace 1 rfent Monttorin) E«iuip™«nt dual 1 f Icatlpn
Data Packnge." Revisl&n S Submitteif as part of Supp] 1 to
AHOEItBOH.r H WestindhouBo Elictric Corp
BO/03/31 17pp
Muclaar £ntrytl Su«t*ma
— B007110379 MCAf-OSB7 SS
"HCIB OPTIKrtC 100 fleeordHrB - Cnu IP fluent Qualification Tes
K«ptj " Suppl 3 NnnjiropriB tnry ver"ion of WCAP-B6B?
MCELIWNEV.D 1, , Mlt-tEB. H B , ANDERSON,! M, Wast Hifrhou**
Corp EISA BOV03/31 ASfp
00714040? Fnrwardi "Ea.ulpmant Oi»9l>*lcatJDi» Tc«t Rept Barton
Traiiimittara-OuaMPtcatlon Oroup D " Application for
withholding proprietary Info t< afFittJtvlt encl Ppnpri«tar«
vorsion uithtiuld <ref JOCrfiH 710)
ANDERSON. T M Wus t » nghouio Elt'ttrie Corp NS-T«A~2SSS
lOpp
-B007H041fi HCAP-BI3B7 15S-EOPA
"Equlpunent dual i f ica tion Tost Rupt Darton
Tranismitters - (lual J f 1 ratUn Orouji Q " Nor
MCEUH/lNEV, 0 L . MH-UER, « D „ nWDERBON.T M
Cnrp BO/OS/J1 3flpjt
W»5tinsh&u»e Electric
—9007140637 Topical rept evaluation of QAW-10133, "Nuclear AppliCBtloni
Boftujflj-B Package " Rapt acceptable
DROOKS. W Core Performance Branch SO/06/19 5pp
8007HOA37 Forwards topical report evaluation for NEDE-a4010-P re u»«
of square root of sum of squares method for combining
dynamic loads For Hark II plants
MILUER.J R Standardnation S. Special Project* Branch 80/06/19
IP
—6007140643 Topical rept evaluation of NEDE-2401Q-P, "Teihnlc»l B««ii
for IVie of Sqyaro finot of Sum of Squares Method for
Combining Ognamic Uoads for Marfc II Plants " fiept
accep tab le
» Mechanical Enginet r ing- Branch BO/06/19 app
H00713052A Requests NRC attention to PP1-TB-770I. Revi sion I S«s
ifescribsd in topical rept sold to applicant Revieu of
mbmittal reifuesteiJ as ioon as possible
HrtLL.W C Teladgne Ennrgu Bottems PPD-WCH-H63 BO/07/10 lp
B007150i1& Forward* propriataru version of WCAP-06B7, Supp 1 Si
nonproprletaru version of WCflP-BSH7i Suppl S ic Equipment
QualiPication Data Package EGE-10. Revision 2, uihich is part
of nonproprlBtarg WCAP-03B7, Suppl 1
ANDERSON,! H Hentinflhotue Elpctrlc Corp NS-TMA-3337 QO/06/li
Upp
— 80071 50A33 WCAP-B5B7 S3-E10A
Nonproprietary version "Equipment Qualification Tsst R«pt-
Wuclear Instrumentation Qt]s (Normal d Abnormal Temp &
Humidity Testing) "
vOOEDJNO.E L Westinohouse Electric Corp 60/03/31 26pp
— 0007IS0636 WCAP-B9B7 Rl
Revision 3 of "Equipment Qyal i f ication Data Program Nuclear
Instrumentation Sys (NIB) Console (Power Range Channel I "
nonproprle tary version
AWDERSOM, T M W&stinghousB EUctrli: Corp EODP-E9E-10 00/05/31.
21PP
goo?15072fl Bummariiea SOOtM1? NRC/OE meeting re ECCS licaniing l«su««
conterning LDCA analijGiB model tt amends. 8ESTR modeliECCS
input roverif lea tion program tc core spray program
BUCHHDL2.R H General Electric Co LFR-030-BO 80/07/OQ 4pp
BOO7I60743 Forwards proprietary HCAP-a6B7. Suppl 2-E04A, nonproprittary
WCAP-a5a7. Suppl S-E04A 6 fievision H to Equipment
Qualification Data Package BSE-4, part of nonproprlet»ry
WCAP-H9a7, Guppl J Info withheld IrBF 10CFR3 790)
ANDERSON. T N Meatln9hou»* Electric Corp NS-TrW-2a39 BO/06/16
lOpp
— B00716075J WCAP-BS87 B3-E04A
"EquipmBnt Dual i fi cation Test Rept, Barton Differenttal
Pressure Transmitters - Qualification Ornup B (Seiimic
Deiign Verification Testingl." nonproprietary version
MCE1.HAN£Y,D L . MILLER. R D Hestinflhouse Electric Corp BO/OS/31
30jip
— B0071A0769 HCAP-B397 R2 81
Revision a Buppl 1 to, "equipment Qual i f icatt on Data Package
ESE-4. " nonprnpiatary version
ANDERSON. T II Westlnghouse Electric Corp EQDP-ESE-4 BD/09/31
80-07160805 Offers no comments on Reg Guide 4 li. "Effluent Honitorina
at Nuclear Fuel Processing & Fabrication Plants," in
response tc BOO 592 memo
KNIQHTON.Q W Research ft Standards Coordination Branch aO/06/19,
2pp
— BOO7160B14 Summary of B0052B meeting u/C-E Dinners group in fltth«sif«. MD
re inadequate core coolind List OF attendee* b vieuJgraphi
ericl
PHILLIPS, I. E Core performance Branch BO/06/23 31pp
•f UBStknghciusB ElffctrU Corp
nCfcaB^. " BupJ-1 l' S^i.
GQDP-ESE-E! aO/05/31
, ="
15pp
WONDOCKETED ITEMS
411
0007170417 Forwards "BWK1N Nuclear Reactor Core IMnolitn Code fl&W
viriion of MEKIN" !< affidavit re request for proprietary
tiassif tcatlon
TAVLDR.J H Babcock t. HiUoi Co 80/07/07 lp
— BOOT1704S1 Affidavit re proprietary classification op "BWKIK Nuclear
Core Kinetics Code.DtM Version of MDUN "
TAYLOfl.J H Babcock t< Wiltni Co 80/07./Q9 7pj)
BOO71QQfl7l Forwards B6neric Itr to all opornlln!] PWH» requesting omond
ta Tech Specs for each throe PWR types onel
0 Division of LlcensinQ UO/Ofa/l I 1 (i
ff Emergency flpi
il th Fd isoii Cu
it ing Instruct 1 ons
filEti BO/04/3O
Revision 2
— 'B0073203M "Hef Emorgencg Qp-erating In strut 1 1 ons (UP)." Revision a
« Commanuoal th Edison Co BO/O4/3Q /S(i p
flQ07S204B3 Foriuarda WCAP-975J ', i.|CrtP-'J75* re i nadpauat* core coolino
HtudiHB t. vendor B00711 apfiliratinn for uji th hal d ing inFo u/
supporting effida-vit flepts will provide analytical basis for
guidalmes rn inadequate ciii e couling detection !. remedy
REED.C He^tinghousB Operating Plants Oaincrs Grnup OG-3t.
BO/07/17 3pp
6007100479 Ltr tn all operating PWHs nrqihun ting amend tn Tech
d*ca(j heat removal capability Amend is nBcssiart) to provide
permanent long-term assurance lliat redundant Y will be
maintained
EIBENHUT.DO Division o F L i c ons Ina ilO/Oi/Il lp
Applies CDT withholding jir oprio t sry info in WCAP-7753 From
public diBrlotniro <reF 1DCFR2 790) Previously eubmittnd
affidavit !. ap p Heat i on. AW- J /- 1 B. *r.c 1
HlEEEtlANN.Il rt WcstinghoiiBE tlectric Corp , fjuclaar Energy
Sustems CAW-QO-38 (30/O7/11 lp
B00718CMfl6 BT9 for FJCSi provid ing foi- rodundaneg In MOCJUJ iiaat
capability In all modus of operation
* BBbcock I> WUcoi Co BO/O6/ U Bp|>
o*1 T-oriundancy in Uecag heat r»moval
on
00/06/1,1 9pp
Affidavit justiFyinij ui til tiold i ng of proprietary inFo In
vendor ECCS -refits f T om puBlic disclosure <r&F 10CFR2 790}
HElSEMflNN.n A Weatinghonse SlctCnt Corp AU-77-1B 77/01/20
ipp
STB for RCB. provldina
tapacltg In all mode* of opei-a
* Combustion Engineer in gi Inc
— 8007180501 STS for fiCBi pT'-ovldtng for rodundancy In Jtcflij haat removfll
eapatlllty in all model of op oration
* MvttlnghQusB Electric Corp BQ/Od/U Qpp
BO072100S1 Advliai that DPc af Controller utll bo billing QE for rvvliu
of NeDO-1120v-04Aj "Nuclear Enorgu Dusin»BB Oroup - PWH QA
Program Ducription, " Revision 1
MILLER, W D Lloni* Fee Manaaum»nt Branch BO/O7/01 if
6 0072 102 21? Forward* Amend 5a to H1A> "Nucloar OA Manual," cor»i»tir>a of
ravised Page S
HAAB8-W P duality Assurance l)r*nch CO/ 07/1 7 2pfi
—00073:10333 21 A rtOSA
Aoiint 9a to 31Ai "Nuclaar QA Manual." coniltttng of rtvlned
Page 9
« C F Draun t. Co HO/07/17 lp
9007210366 Forward i ACUTDX Corp 000331 r-triponii to NRC question* on
NE!>E-ai77B-P. "Vent Bys Cojnpres»ib 11 i ty - Cff»ct» on Mark I
Poo-1 Bbitll "
BUCHHOL3!,fi H 0«n»rB) EUctrlt CD HHD-OS9-aO BO/07/14 47 fp
B007aiOfllO Forwards written not i F ieation supplied to customvri on
BG070B re potential for Irvadvirrtflnt boron dilution »vint
uhll* shutdown & operating on RHR tiji Modi flits praviauily
rtrported interim actions
ANDERSON, T H Was t ingtiouft* Electric Coif , PHH Syittmt Dtv
NB-TMA-8a73 BO/07/OB 7pp
8007220134 Forward* roviau of CENPD-1Q3-P fe revliion daicMbing methnd
used to BEtabllah overall me»»uroment uncnrtalntg of con
power flstrlliutlon compononts Rtjit in accept ablo For
rDfannc* in license application*
MILLER- J R Btandardiiatlon & Bpeclnl Project* Dra-nch 00/07/03
3pp.
BOO72a-03a? ForuarJB nonprnprietarv veralon of NEDO-B47Bl-li "Compar-iion
of Single t< Multivenl Chugging at Tuo (3cnle»- " sulnnifcteJ on
behilf of Mark II ouinori group
BUCHHOl.Z,R H General Cltctric Co MFH-liaa--eO BO/Q7/OB lp
—8007220334 NeDO-E47Bl-l
"ComparUon of Hingis & Mult Went Chugging at Two Beaten"
tveinproprielarij vorsion
PAT6L.B.R . DDLAN.F X . DLQCKi J A, Cr»ar>. Inc CHEARE-TN-307
BO/01/31 B4pp
6007330352 Foruari!* procBdure guldoHn** for plant* ui/hlgh fc lnui h«aif
high pressure tafetg Injection 9«Bi emerfl»ncij procedural &
lnt»rim adequate tare cooling instruct! dtis fc ref
tnitructlons for post-LOCA cooldown *i d»pr»»»uri i«t ion
BEED.C Cammonuieatth Edison Co 00-37 00 f 07 f 19 2pp
"UOss of FocdkiatcT Induced LOCA Analysis Rept "
TA^CHEpU Mc5.tinghiiU5B Eleclr" Corp . Nuclear Energy BystofflS
80/09/31
— 8007330903 WCfti''97Sfl
"Ihadoniiate Cere Cooling Studic", of Scenarios tu/ FOB dual or
Available. Uung NOTfiUHP Computer Cede "
THOMPBdN. C M , MAFW.R H , HILL, 0 f. WOE 1 1 nghoL-se Electric Corp
Nuclear Energy Systems 00/06730 ALOpp
B007Z4QOD1 RoruardE OAW-li?3, "Control Rod Cuide Tube Uear MaasuTen
Projram " Rapt dotumenti luear mEfl-aur ement a In reaponse to
NRC 79 II S3 ) tr to OUITUT i of D5.W designed reactors
TAVLOR.J H Dabcpck I. Wiltot Co QO/07/la lp
--BOO734000H BAy-li23
"Control Rod Guitle Tube Wi-rir flaasuremen t
» Babcoct & Hllcai Co
[100733017 fe Advisee that NI4C had accepted DNS-RSS-QOI J1. "Dou Sv> for
Solidification af Loia Lew 1 R-iduiaste from Nuclear Putuer
Plant-B " Tinal re-pi tu be sutuni ttud pending incorporat ic-n
of amends per wuc) NRG guidelines
DDNOVAH, L J Doui Chemical CD 80/07/21 lp
— B0072501B3 Informs of NRC act ep.tatic e of DN5-RSS-OOLP r* rartWiilt*
sol idtf icat ion Fire protection *< tntErPacEa lu/plant »fll
ahoultl be considered interfstB requirements, that will. b«
adirosaed by .ipplicdnts refBrencing rept
MILLER. J R Htandardiiation E, Special PrujBcti Ocanch BO/OA/11?
BOO73S051S rtaquBs-ti approval of proposed chdnge in fuel d*«ign »
dBBtriboi! in NEDL-3'lOl 1 -P-A- 1 , "Qeneric Reload Fuel
Application." hug 1979 Change mould alloui OE to respond to
QWn util requustt le high ca|>ac.itij IB-month optrating tijflt
ENCtL.R E General Elnctrir Co MHt-\.27-f)Q BO/O7/BJ 2pp
Forurardu errata shent to EnAC-1 17-255 01. "Evaluations for
0 A 9 Ground Acre I ova I i on Case - Suppl 2 tn Addl
Investigations to Determine Effect? nF Tomblnod Vihrntonj
Verona Fault." RBvision 1 , "5upp 1 2
L Oc-neral Eloctric. Co BO/07/23 Spp
— B0075BOibt)ii EDftC-117-a33 Ol HI
Errata eheet to "Evaluation tor O & g Oround Acceleration
Case - Suppl 2 tu Addl Investigation* to Del ermine Effects
of Combined Vifcratorg Verona FauSti" Revksinn 1. Suppl E
n Engino Drmg Decialod ^n^lijsiK Companij^ Inc QO^O7/2B Spp
B00729O733 Artvlses of decision not to participate in pretest prediction
of LOFT 1.3-1 B i pt'rlmeiit. 5int e reason's for prediction do not
apply to licensing uiorh ECCS analyses uiill continue to b«
provided to reload fuel customers
OWSLEY.fl F Cnon Nurlsar (u , Inc (=,tibs of Enon Corp >
(JFD 115 80 qo/O7/P4 Lp
-B007S203M "Interface Oul<t«llni!» DetuiBun Eirnrgeney Protidurei b
Inadequate Core Cooling InstrwetiO'ni, "
» CommDnuiBafth Editor Cn BO/07/ltS lp(
-8007320357 "Ref In.triic tion* fot- Post-LOCA Cooldoun fc
DtprtssuriiatiOTii " Revision 0
» Commonwealth EdiHon Co BO/04/30 13pp.
BO073000B6 NIJ 1 1 f itsti on of BOO SOB meeting u/Human Performance
TeKhnologie-B !< fianrtia Lan in bilvur fipriTigp MR to develop
checklist for emergency proLodureB
BTOHE. J C OFTicB af Inspcctmn ?< Enf 01 1 emcnt, Office UP the
Dinctnr
412
NONDOCKETED ITEMS
HOO7300399 Furtner discusses specific info in WCAP~B4BO re upper head
injection Quantitative info needed re high resistance of
flou path in transferring steam tu upper head uih-en pressure
Is iDiuer than flCS
WALLI9.Q B Dartmouth College SQ/O7/24 3pp
BOO707O135 Lists pnoritlicd directives In order to eipedtte contract
completion Further stati ntl ca 1 analysis need not be
underta k en
EADIE.G Uranium Recovery Licensina Branch FIN B-2314 BO/Oe/02
2pp
90073CO'1S2 Foriuaids "NRC Benchmark rlElOi Vert fi ca-ti nn Rep t, Apr 1980 "
ME1OI calculations agree uithin S"J. of ant-uers provided
la/benchmark problems eicept for answers to Problem 3
Rept availaple in Centra-! Piles only
CflHN, A L jlechtel Pouier Corf (subs of Dechtcl Corp ) BO/07/23
8007100431 Responds to 800226 rea.uest for review of Cottar Corj
proposal re disposal of contaminated trash in U mill
tailings impoundment Disposal will have no adverse effect on
Function of impoundment t-I/o end consultant comments
8CAf?ANO. R A Uranium Recovery Licensing Branch BO/03/19 2pp
et)O731O29i. Nodficatlon of aOO7DO-31 meetings u/ventfars ft consultants
in Ban Jn-ne, C/i to discua-g Hdfk 111 LDCA-re lated po-ol
dynamic load criteria
FIELDS. M Containment Systems Branch BO/07/21 4pp
8007110-454 Foriiiards 000613 testimony presented at Railroad Commission
oF TX hearing on application for surface mining &
reclamation permit for prPject Requests issuance of permit
ai soon as possible
DAVIS, Q R Anaconda Co , Anaconda Copper Co Div 16616 BO/06/16
IP
WASTE MOT WUCLEAH WASTE MANAGEMENT
HOD7010270 Responds tn BO0513 request for separate Mlt.CDii computer
output For Bam Mlgue-t are buying station Tallinjs mgt
program k rarf i olog ical impact assessment underway
Prsl 1m i n-ary results !i dose estimates end
SCAB AND. I? A Uranium Recovery Licensing Branch BQ/06/16 3pp
— H007010274 Requests offsite doee commitment output From MILDDS fpr ore
stockp 1 1 csi rpt eivlng hopper. belt conveyor & sampling plant
Comparison of orp boylng station to .offsite dose estimates
for complete mill will be useful to vendor fc NRC
J Coldrado. State- of SO/05/13 9pji
B0'l>702007a Advisei that NRC IE unable to participate in Mom«stalie
Mintnj Co Pitrh project on continoirg basis requested In
BOD21'? Itr due to limited resources for technical assistance
to Agreement States Suggests revleu on state level
6CARANO. R A Uranium Recovery Licensing Branch BO/OA/09 tp
8007O2013Q F(ir wards "Simutat t on Study PF Evaporation Pond Seepage at
Mount Taylor UMlll Project." in partial response In State
a* NM, Environ Improvement Div.SO06O9 renuest for addl info
re proposed gronnduiater discharge plan
ROOERS, W L Gulf OH Corp . Suit Mineral HesourCBE Co 16349,
ao/oi/io ip
— &007020135 -541TL.337
"Simulation Stui'ij oF Evaporation Pond Seepage at Mount
Taylor U Mill Project "
MUKHERJEE.H Qgl f Sciencs fc Technologu Co 16569 BO/OS/30
IBpp
B00702OI4B LVl»ctisse<s review of proposed Nose Rocl( U Mill Hill uiai
propoaed for const in State nf NM ti environ * tailings mjt
revieu was conducted in response to technical assistance
requeat Case considered complete as nf Mar 19SO
MIU.ER.H -1 Uranium Race-very Hcensinj Branch BO/03/BI Sfp
H0070HOSt4 Provides inFo In respnnae to J We lie inquiry ro Unifced
Wucluor CorpiChurcl) Rot! U Hill tailings 790716 dam failure
Failure caused same radioactive tailings solution to be
re leaned into Rio Puerto Released FR oieerpts end
D1RCKS.M J Office of the Executive Director for Operations
flO/06/09 2&PP
--B0071 10457 Ttatimony of Anaconda Copper Co hg OR Davis On S00613. b«foPI
Hflilroad Commission of TX Pp 1-11 Draft afFidavtt fc r»*um»
end
DAVIS. O R Anaconda Cn . Anaconda Copper Ca Dlv 16416
BO/Od/lA 14pp
—3007110459 Testimany of Camp Dresaar fc NcKee by ED Sethnesi on 800413,
before Rail mail Commission of TX Pp 1-5 Resume encl
SETHNE53. E D Camp Dresser tt HcKee. Inc i Environmental
Sclences.Div 16616 BO/O6/13 7pp
—6007110463 Testimony of EL Reed & Associates by EL Reed an 0006 1 3.
before Railroad Commission of TX Pp 1-7 Resume end
REED.E L Ed L Reed % Associates, Inc 16M& 80/06/13 ?PP
S007I50045 "Principle Parameters for Radiological Assessment "
• Daun Mining Co 1A708 80/03/31 aSpp
a0071706<!.0 Forwards "Lou Level Waste Licen»ina Branch Review oF MucliJr
Engineering Cdi Inc Application far Renewal of Be4ttg,KV
Licensei" in response to request
SMITH, n D Lou Level Waste Licensing Branch BO/ 07/03 lp
— B00717066H "Lou Level Haste Licensing Branch Review of Nuclear
Engineering Coi tnc Application for Renewal of Deatty.NV
License "
* Loui Level Waste Licensing Branch BO/07/Q3 40pp
8007180021 Forwards Nuclear Engineering Co, Inc 800404 application For
renewal of State of NV radi-nactive mat! license at Beattg
loin level uraste disposal site State of UV has requested NRC
comment
KEFIR, G \1 Assistant Director for State Agreements Program* SA/RJP
00/06/O3 350pp
SO071B092B Refluests establishment of u/aste mgt docket file MM-13 at H
Street PDR Docket file concern a technical aigiitance to
StatB of NV for state reneiual oP BeattU. NV lou level uraite
Facil itij license
HEDDlNOSjT p Lou Level Waste Licensing Branch BO/07/O? 2pp
0007310104 Forwarils completed Page 4 of Operational Monitoring Rept
3-BO.
CAIN. J Cotter Corp 1674B 60/06/30 2pp
— B0070S0379 Testimony of- WJ Dlrclis before Suti-cnmml ttee on Energy
Environ rv ChOTth Rock U mil) tailings dam failure
DIRCKS,H J Office of the Hieiutive Director for Operations
HOUSB of J?ep , Interior d Insular Affairs 79/10/22 14pp
HO 070203 a I TpTuiards response to Item 1 discucsed at 9004 1 7 meeting,
completing i-nsfionsps to 17 items identified during BQO'Bia
meeting Requests meeting during wk of 0006-09 Overstied
drawings encl
THOMPSON, K A Cyprus Mines Corp 1656B RO/06/Oa lOpp
B00731013B Ack reCBipt of B00619 1 tr re proposed study of potential
U development in CO Total impact study should be conducted
rather than case bit case evaluation Request* moral b
financial support for study
REHPLE.L Citiiens for Safe Environment 16737 BO/06/22 lp
BO0732Q03S Forwards long range plan for processing of Uravan mineral
belt oires !i supporting documentation submitted to Radiation
& Hazardous Maste Control Dlv of CO Dept of Health
REKEMEYER^P C Union Carbide Corp 16693, 0O/06/11? 4pp
B007020359 Bequests- that Union Cariide li Acres American c-onsider- end
i tens in submitting tailings pond 5-taS 1 1> ty analysis to
State of CO. D«pt af Health Inuludoi careful presentation of
all assuraptiont made during modeliTig
JUNOE, W R i CaloradOf State of J65B2 BO/OS/31 S5np.
6O070S070B Corrects tupogrnpnua 1 Brrof» In 300602 renponsB to Itsn 1
ffepjac ement Paoe 3 encl
THOMPSON. M A Cgprus flines Corp 16566 00/06/09 ?p,p
-0007330032 NUS-3B94
"Facilttiea Stack Audit, Uravan U Mill
* NUS Corp 16693 8O/0&/23 Btpp
-SO 07320036 NUS-3503
"40CFH190 Re-Uted Radiological Doles Due to Operation of
Uravan U Mill "
BAFtTRAM, B W , GNOLEHART, (1 W , CONWAV, T W NUB Corp 16693
80/09/30 B4pp
— BQ07OS071 S Cori-Bcted Page 3 in BO-0603 rffsponsa to Item 1
* Cyprus Mines Corp 1AS66 80/06^09 lp
-BOD732004a "Cost flept TaiUngs Btorapo & Evaporation Pond Evaluation.
Long Part tt Paradox VallBij Sites Uravan U Mill. Montroie
County, CO. " for Union Carbide Corp
OODDV. J R Dames A Moore 16693 SO/05/23 ASpp
NONDOCKETED ITEMS
413
-B00732004V "Tailings Storage r, Evaporation Pond Evaluation, Long Park t,
Paradox Valloy Sites, Uravan U Hi 1 1, Montrose County, CO, " for
Union Carbide Corp
DDDDY, J R Dames I. Moore 16693 BO/O5/23 EOOpp
-8007320056 "Uravan Tailings Piles Prior to Reclamation "
uRQUN.H Union Carbide CIJTO 16693 BO/06/09 lp
"000722006-1 "Proposed (tec lamdt i on Plan for Uravan Tailings Piles "
DROWN. R Union Carbide Corp 16693 BO/O6/09 lp
600701000*? Eieiutive Branch position rp DOE application For license
to eiport 32 6 kg U, containing 6 4b U-235, to France Ltr of
NOSENZDxL V State, Dept of, Bureau of OL
Scientific Affairs eO/06'10 3pp
!. Internatl En\i
00Q7O10012 Executive Branch position re Dept of Davy application for
license to export 1,019 kg depleted U to Australia License
should be granted
NOSENZO.L V State, Dept of, Bureau of Oceans !< Internatl Environ
Scientific Affairs BO/06/11 lp
— BOO7220074 "Proposed Plans !. Estimated Costs For Tailings t,
Hoc lamat Ion. Mi 1 1 Dec ommi ss loriing d Pond Reclamation at
Uravan Mill - For Surety Purposes " Memo dtd BQ0530 re
requirements for sub -surface disposal permit encl
» Union Carbide Corp 16693 80/05/30 19pp
— B0072200B1 "First Ouarter, 19BO Summary, Env t ron !. Health Physics
Monitorlng.Uravfln.cn "
JONE8.fi K Union Cnrljide Corp 16693 BO/03/31 63pp
— B00722OOB7 "1979 Annual Summary, Environ ". Health Physics Monitoring,
Uravan. CO "
» Union Carbide Corp 16693 79/13/31 200pp
--B00722Q101 NUB-359-J
"Review of Available Meteorological Data Representative of
Uravan U Hill Bite Vicinity "
COFFEY.M E , MAXWELL, D U , CDNUAY, T W NUB Corp 16693
BO/O-i/07 21pp
— B007220111 NU8-I1544
"Correlation Analysis of Variables Affecting Airborne
Radioactive Participate Concentration Near Uravan U Mill "
Intl Engineering Co, Inc Itr forwarding preliminary const
estimates of proposed disposal sites end
HARTflAH, D H , DQUQHEHTY, D K , ENGLErtAHT, R U NU5 Corp 16693
DO/03/13 200pp
— B007220U9 "Prol iminari) Qnolecrmical Investigation oF Proposed Spring
Creek Mesa Tailings & Effluent Disposal Site Near Uravan.
CO "
KINO.K 0 Morrison Knudsrm Co , Inc 16693 BO/05/31 ISOpo
aOQ723O14S Responds to BOD633~34 memos transmitting State oF NM
response tn Church Rock tailings ilam stability Issues raised
in NRC 791310 Itr NRC rjootecrin ital consultant Is reviewing
rttponsa to determine IF issues are addressed properly
BCARANQi R A Uranium Recovery Licensing Branch BO/06/30 lp
B007330730 Forwards (I Klnneson revlnu of NM Environ Improvement Div
proposed verification sampling echeme W/o encl
EADIE'O Urnnlum Recovery Licensing Dranch 00/07/09 lp
BQQ7B3Q1HQ Requests confirmation oF H0061B telcon re application for
source matls license NRC uilll nut require revised amended
application under new guidelines since environ work was
band on old; guidelines
8HEnMAN.ll 0 Arnold S, Porter 1677? BO/06/25 2pp
3007200194 Foruioido as-built plnns For breacli repair & tailings dam
expansion ll/o tmc I
HILL.T M United Nuclear Corp 16FH7 BO/06/S7 lp
B007B90SPH Confirms that FJODci2b Itr accuratelg describes NKC opinion re
filing OF amnmled application u/Eltate of CO lladiatlon t,
Haiirdaus WflO to Control Div for matls license
BCARANO.H A Uranium Recovery Licensing Dranch 90/07/03 lp
S007010014 License for Marubeni America Corp to eiport 6 g Pu, 1 g
Pu-242, 1O g U-233 ?e 100 g U oiide to Japan
PETERSON.M R Assistant Director far Fi port/Import I. International
Safeguards ZH0126-OU SO/06, 19 2pp
BQ07010019 Eiecutlve Branch position re application for licenses to
eiport highly enriched U to Japan Since no int prmed la te
consignee is used, 1 i censp condition requiring specific
modes of transport is no longer necessary
NDSENZO. L V State, Dept of. Bureau of Dceans I, Internatl Environ t
Scientific Affair? QO/06/IB IP
B00701O102 Application by Uestinghouse
proportional counter to Uest Germany
POCHAL.U F Westinghouse Elsclric Corp ZE-10303 BO/06/09
license to e-iport one BF3
lp
B007010170 License for Horg-Warner Corp to eiport carbon t stainless
steel globe & checfc gate valves to Belgium
PETERSDNi M R Assistant Director for Er port/lrapot t (. International
Safeguards BO/06/ 18 lp
Q007O10972 Requests eitension of eipiration date of license to B1063O,
because of delay on some items due tfi inability to acquira
ran) matl
HOQERS.W F Metal Bellous Corp 80/Ofc/l? la
B007O10577 Application by Aldnch Chemical Co for license to eiport 5
kg deuterium. in 20 kg deuterium oiide.to Belgium
EDELSTEIN.B Aldrich Chemical CD , Inc (subs of Sigira-Aldr i ch
Corp ) 13/00 80/06/12 lp
BOO7020011 Application by Aldnch Chemical Co, Int for license to eiport
1 *g deutenumiin b kg deuterium oilrfe.to Neu Zealand
EDELSTEIN.B Aldrich Chemical Co , Inc (suds of Sigma-Alnr i ch
Corp ) 10/80 90/06/13 lp
FJ007020030 License fnr Panalpina Airfreight, Inc to eiport 7 9 U,
containing 1 61 g U-235. to Finland
PETERSON. H R Assistant Director for Ejport/Import !. Interna t innj 1
Safeguards BO/06/ IB 2pp
B 007 030 057 Requests assistance iii obtaining necessary Itr of assurance
For application for eiport license
PETERSDN.M R Assistant Director for Eipor t/Import !' International
Safeguards BO/06/1B lp
B0070200B-1 Application by Oft Co to amend license to eitend eiplratinn
date until Jul 19B2
HOWRY. W R General Atomic CL, (suns of Gulf Chi Corp ) IEL-11S5
BO/06/09 lp
B007030093 Advises that NRC BOOS16 formal vote determined that
applications to eiport SNM to India Jid not meet criteria
for issuance Applications inert referred to President for
further consideration
SHEA. J R OFdre (if International Programs. Director BO/06/12
H00731Q497 Forwards "Golld Nosto Disposal Rnpt. " for June 1990 to Dept
of H«nJ th. noiliDloglcol It llaiarilous Uaoto Div
JDNE9.R K Union Carhido Cnrp 16954 QO/07/1B lp
~ B007310900 "floltd Woste Disposal Rept. " for June i960
» Union Carbldu Cnrp C10/07/1S 67pp
XPDRTLIC
EXPORT AND IMPORT LICENSES
7706300023 Reiiijustii Fiecutivn Branch position re OE application fnr
licenao to Hiport six detector aoBDmblios to India Forwards
790307 application W/o end
DPLINOER.Q 0 Assistant Ditpctor For Eiport/ Import & International
Saftguardti 77/09/19 lp
B007O30123 Advises that appliration to eiport specially designed! parts
t< components tn India uifls referred to President for addl
consideration NHC unable to Determine that application meet*
criteria of Atomic Energy Act
8HEA.J R Offiie of International Programs. Director BO-/O6/li
IP
8007OSOIS3 Application by Kauecki Derylco industries. I nc for license
to eiport 414 4 ft Zirconium II seamless tubing to Uest
Germany
TRIOLO.K Kauierki Berylca Industries. Inc 76408 BO/O6/O3 lp
B0070a023B Foruarils DRfi Intl. Inc Itr re eiport license U/D encl
PETERSON, M R Assistant Direr tor for Eiporl/Import !. International
Safeguards BO/06/1B IP
NONDOCKETED ITEMS
7CVZ026Q Executive Branch position re DDE application for license to
sport 610 mined oiide fuel pins to United Kingdom Ltrs nf
ssurance enc 1 License should be planted
DSEMZO. U V State, Dept of. Bureau of Oceans r. Inlei-nati Environ (.
.lentific flfUirb 80/Oi/LB fcpp
7020374 License for Trarsnuc 1 ear, Inc to eiport 30,716 kg U.
ontainina !,2t4 kg U-235. *< 12?. 22fl kg natural U to QErmany
ETERSCN.M R Assistant Director for Ei p art/ Import E. International
afeguards rjLM-311? BO-OS'S/ BO/Od/19 Spp
0QD7Q3O23& Requests assistance in obtaining necessary Itr of ntur
for end BQQ&OA eiport license apolicatlon U/o end
PETEFISO.N.M (I /Usiatant Director for Hi port/Import fc International
Bafaguards
HQ0703O3&0 License For Metal Uellous Corp is amended to Bitend
expiration date until 310730 All cither conditions remain
unchang ed
PETERBQNiM Fi Assistant Directar for Export/ Import t. International
Safeguards ft 14471-2 BO/06/34 Ip
7O20277 Poruards 000126 license application tt Favoiabls
iB-cutivff Branch •/ 1 BUS foi re^ieu Under 10CFB 1 1O. Commiss i an
evi BUI no longer I etiuirfld U/n encls
eTERSCN.MR Office of International Programs, Dti-ector SO/06/33
IP
7QSO3B3 Amend 4 to license for GA Co ei tending eipiration data
ram BOO70I to 92O7O1
ETERSCM.M R Assistant Director for Eiport/ Import t, International
aFes"ards IEL-7-40 BO/Oft/19 Ip
70202B9 flmend 3 to License 3 for Eastman Kodali CD eitending
ipiration ddta from OOO701 to H20701
ETERSONi M R Assistant Director for E iport/Impnr t S< 1 ntarna tionol
aPagii-ards &0/06/2O IP
7020344 Requests aisistante in obtaining neceiaarij | tr of assuranca
or application for eiport license
ETEHStlM.HR Assistant DirectDr for Ei por t/ Import f. Internatioral
afsguarilB BO/Ofc/lB Ip
702O34& Suimlts application to amfnd license to -Bitenri oipiration
ate until B&063O, to transfer 0 P31 itiC i tritium to United
ingdum
UTTHE. O KM3 Fusion. Inc (subs nF KH3 Industries. Inc )
IO/O&/Q5 ]p
*702D349 ReiiuestE assistance in obtaining necessary 1 tr of assurance
or application -Tar eiport license
'ETEHSONiM R fissiatant Director for El port /Import & International
afeguards 30/Oi/lD Ip
I7O30351 t-icunsB for HarubBni America Carp to eipoi-t 29,193 kg U,
ontaining SOO hg 0-235, to Japan
'ETEnSCJN.H R Assistant Director for Eipor t/Irrport & International
afeguards AH01IHAW BO/Od/lB 2pp
70203-73 License Pur Ed I oui Intl Co as agent Far Meridian Enterprises
a Bipnrt 503 kg U, contained In AGO lig deplotad U ntidi
ouider, to Taiwan
hETEHSON,M R Assistant Director For Eiport/tmpor t ft International
iafsguards IH-1 8O/O6/24 Bpp
DOO7070004 Foruiards applications far license to eiport fuel rod nuclear
jisaij ogs ti CF-253 iiiurce to Uput OpTmany
HANSEN.L E Enoii Nuclear Co . Inc ( subs of Emon Corn >
SO/Oi/li Ip
— ao07D7OOOfi Application bg Euan Nuclear Corp for licansa to eiport
1 0^ mj Cf-23B neutron source to Wo i t Germany
HANS EN. L E EJIDII Nuclear Co , Int Uuba of Euan Corp )
Ip
— DO0707QQOS Application bi| Eiion Nuclear CO) Inc for licenoi to mport
fuel rod nuclear a«saij aijB to vlett Geimonij
HANSEN.L C Euan Muclear Co , Inc (subs at Euan Corp >
BO/O&/IJ, ipp
80070700(17 licnnse for West i ngh OUBD tn eicort 1 BO uCi Mp-237i contained
In 12 radiation surveillance c ap aule KI to Taiuian
PETERSOHi H ft Asmstant Director for Ei p ort/Import U IntBrnational
Safeguards BO/06/24 Spp
BO-0707001 0 Application by Transmit 1 ear. Ine to amend licinn to extend
atpiratlon iatt to Q11ID1
MATSQM, V Transnut lear, Inc BO/Od/lB Ip
0007070033 Foruisrds application far licon-se enport source mat! to
Italg
KEEHftN, R P Nostinghouse Electric Corp ICS-0417 BO/06/13 Ip
— B007O7O03-4 Application bij Uffst inghomo for llcensn to Biport 3 7 lig
U-233. contained in ft!7 kg dcplated U, to Italy
HEHSCH.H M HestinHhouse Electric Coi-p ICS-O^l? BQ/06/12 Ip
D007070023 Licence far GA Co to eiport 1 O35 kg U -233, contained in 5 8
kg U as TfllQA UtrH fuul cluster element B, to Taiwan
PHTERSON, tt R ASH ii taut Director far Export/Impjort (• International
Safog wards 00/06/34 2pp
HD07070029 Appl i cut ion bg Biflma Chemical Co For license to export 10 kg
deuterium to N?iu Zealand
B Sigma Chemical Co (subs of aigma-Aldricli Corp ) D-46
BO/Od/13 Ip
17020379 Application bij CEBAC, Int For license to eiport 43 ^4 (g
fiori \ntii contained in 5O kg thorium oildeito West OermJinj,
OLTOM, E Cerac. 1 nt 80/0£i/20 Ip
I70S03B3 Afip Ucat j on bg Isotope Products LabB for license ta export
g solid curium metal oiidc as source ui/benjll] urn holder,
a France
1ELM.K. Isotope Products Lali oratories W/0 7Bi33 BO/Ot/19 Ip
17030125 Foruards license ap pi ic-a t tonj favorable Eiecutive Branch
fiewi (< propOBBd license ta-r oiport of 37 I kg U to He»t
Jermanij for Fuel element fabrication License uiill bo i&iueil
J/O encls
'ETERBON.K H Assistant Direct-or For Export/Import ft International
Safeguards HO/Ofe/]-; Ip
37O2063B foruiarda China Na 1 1 Insbruments BOO&Ofc 1 tr re UBB OF
louered detectnrB Westinghcuae 80O61 I merao end
F WeBtlnghousc Electric Corp 80/06/16 3pph
Forwards EiecutivB Bratich response- re encl pending eiport
H-cimae appiicfltion for advance info Requests initiation of
final r*view to Facilitate parly response to forthcominj
action papar U/a ent 1 n
3HEA, J R OffiLO of Internationat Proaramn, Diru-ctor BO/06/1B
>P
80070700^^ ftpplicntion bu Cnrg-Hflrner Corp, Nuclear Valve Div to amand
llcu-nse to eitond explication date to GID701
HAH. 3 V Dorg-Warner Corp . Nuclear Valve Div C9H/BO/256,
GO/Ot/19 la
B0070-70Q-.lfi Liconoe For MitBublonl Intl Corp to e«port 450 mCi Cf-BSZ,
to Japan
PETERBnN.M R rtasiBtntit Director for Export/Import fc Intirnatlonol
gafeguonts BO/O6/23 3pp
BD07O70041 Application bij Heat inghouafi for license to eiport thria
HL-6377 compsnaated ioniiaKon chamtiara tn Franto
POCHAL.H F Westlnohous* Electric Corp ZE-2O359A 00/06/16 Ip
8007070017 License For Cham-Hue loflr Gij«,Inc to export auxiliary
dcminnTl ler ags, including 1 on -e i change run in a, f 1 1 tratlon
matlfflir comprosBori lead shleid-ai pumps, hose* !< mi acel lannawi
•partii to Ta luan
PETERSON, M R Assistant Director for Eiport/Import d International
SaPeguardfi SO/OA/E'l Ip
S00707011I I leant e for OE to cipart 0 25 kg U-233, contained in 2 9 kg
Vi as pellets in ilrconium rode. to Taiwan
PETEflSONi M n /vssntnnt Director for El port /Import li International
Safeguards QO/Oi/24 Spf
07030063 Application b« filtfiich Chemical CQ, Inc for licanse to
sjport 1 lig dcu teriun, in 5 Itg deuterium niiilB.to South
<orea
EDELSTE1N.B Aldrlch Cheirncal Co , Inc (Subs c-P Bl ama-Aldr it h
3orp ) 14/BO QO/06/12 Ip
SOQ7O70123 Eubmlta br oakdcuiin for Taiwan Fuel dasigned loading for
Maanihann 1 & 2 Total eq.ua la 1,1,2,911 kg. containing 4,474
kg U-333
HESSjfi J UeltinBhouse Electric Corp BO/O6/ 1 9 Ip
BOQ7Q7014Q Forward* Nukem Gmhh of West Germany *»!•« re eiport fc
itoraje of IS9, HOO kg natural U, containind 91? kg U-239,
MATSONiV Trnnsiiu clear. Inc BO/0&/OS 2pp
IMONDOCKETED ITEMS
41B
B007070149 Forwards Nukem Qmbh telej re delay in eiport of highly
enriched U
HATSQN.V Transnuclcar, Inc BO/06/O9 3pp
800707042S License for Halprin Supply Co to Biport 135 mCi tritium,
contained in foils in Model 1137-E static electricity
lUtection meter, to SinjaporB
PETERSON, M R Assistant Director for Export/Import (. Inter-national
Safeguard* 80/06/24 2pp
BQ07090028 Transcript of BOO51& open Affirmation Session BO-23 in
Washington, DC re order in Tarapur export Pp 1-3
* Commission SO/OS/ 16 4pp
— 8007110013 Application by Canadian Embassy for license to e.port
4 . 0 3 9 Pu Metal ""M9 e. to Canada
HARRISON J £ Canada DO/G&/09 3pp
G007H0021 Forwards application For license to »ipo
to Belgium
KEENAN.R P Uestinghouse Clectnc Corp IC5-041
rt U oilde pellets
S ao/Oi/12 ip
BOO7110029 License for Hutal Bilious Corp to eiport spare nuclear parts,
to Spain is amended to add another authonied ultimate
consignee
PETERSON, M R Assistant Director for Eip ort/ Import t. International
Safeguards 14345 80/O6/37 Ip
— 8007090030 Informs of correction to SECY-BO-239 re pi-opaied e. ports of
fuel & components to Tarapur Commission SECV papers cited
are incorrectly referenced Draft memorandum t< order end
BHEA.J R Office of International Programs, Director BO/05/13
13pp
— BQ07Q90033 SECY-BO-23BA
Forwards NM6S technical review far Commission's
con li deration in conjunction u/revieiu of pending Tarapur
fu«l & component exports
BHGA, J R Office of 'international Programs, Director BO/05/13
— B00707O030 Forwards proposed NMSB technical review for Commission
consideration re proposed eiports of fuel b components to
Tarapur
BURNETT.R F Division of Safeguards BO/O5/1S 4pp
BOQ7O7O104 Responds to Subcommittee on Nuclear Regulation BQQS01 Itr
poiing questions re Commission approach to foreign health tt
lapaty issues Commission issued decision an reactor eiport
to Philippines on 8O0506 W/response to specific questions
AHEAHNE.d F Commission Bo/Oi/06 llpp
— BOO7O90114 Order granting issuance of licenses to HBstinghouse for
eiport of r factor to Philippines Separate Commissioner
opinions encl
CHILK, S J Office of the Secretary of the Commission BO/05/06
61pp
8007110142 Transcript of 800513 tlossd meeting in Wash ington. DC re
disrussion of Tarapur eiport license Pp 1—14
» Commission BO/06/19 16pp
BO07110213 License For US Dept at Navy to Biport 3.019 kg depleted U,
component of 20mrn ammuni tion, to Australia
PETERSON. M R Assistant Director for Expert/Import !. International
Safeguard? SER 63/779042 90/06/27 Bpp
SO07I1021B License far Hestinghouse to Bipart three compensated
ionuatiDTi chambers. Model WL £377. to France
PETEHSON.M R Assistant Director for E'Qort/Import fc International
Safeguards ZE-20359 80/O7/OI Ip
8O07110226 License far Mestinghouse to eiport one proportional counter
Hodel WX337S5, tu France
PETERBDN'M It Assistant Director for Eipor I/Import b International
Safeguards ZE-30356 BO/O7/01 Ip
B007110337 Application tj Reuter-Btolies. Inc for license to eiport tuo
fission counters, compensated lontiatian chamber t neutron
ion i 13 tion chamber tn Mexico
SKARUPA, J D Heuter-btolies, Inc 80/0&/S5 Ip
BOO711024I License far Aldrich Chemical Co, Inc to eiport 1 kg
deuterium, contained III 5 kg deuterium ciide-to Israel
PETERSON, M R Assistant Director Far Ei port/Import t Inter nati anal
Safeguards 13/BO BO/07/02 2pp
B007090109 License for QA Co to eiport fuel cluster assembly tools,
fuel cluster handling tools. fuel rod insp divice t> fuel rod
storage rack, to Taiwan
PETERSON. M R Assistant Director for Ejport/Import b International
Safeguard K BO/06/24 Ip
8007110252 Requests assistance in obtaining Itr of assurance for encl
BOOilH application for Eiport License XSNM-li95 W/o
application
PETERSON, M R Office of Intarnational Programs, Director BO/Ot/27
tn
BOO71Q0027 Liconae for Byron Jackson Pump Div, Dorg Warner Corp, to
•iport specially designed or prepared parts d components for
uie in primary coolant pumps t> other pumps, to Taiwan
PETERSON. M R Assistant Director For Eiport/Import b International
Blf«Quards BO/06/34 Ip
B00710014& EiBcutivc Branch position re Radium Chemical Cor Inc
application for amend to license to eiport tritium to
Switzerland, Belgium b Hast Germany License amend should be
granted
NOBENZO, L U Stato.Dept of, Bureau of Oceans ti Internal! Environ 1>
Scientific Affairs BO/0&/24 2pp
BO07100263 Forwards application by Mestinghouse for license to export
6,0 kg U oxide pellets, containing mai of 4 S'/, U-233. to
Belgium
KEENAN, n P Mestinghouse Electric Corp IC8-041B QO/Oi/12 Ip
— 8007100271 Application by VlBitinghouse for license to eiport <b 0 kg U
oiide pellets, containing mai of 4 5V, U-335. to Belgium
KEENAN.R P MmtinghouSB Electric Corp IC8-0412 90/06/12 Ip
BO07100HB1 Foruiards application by Mitsui t. Co, Inc for license to
export 9? kg U-235, contained in 3, 640 kg UF-6. to Japan
BAIHI'T Mitsui t. Co , Ltd BO/06/03 Ip
— 9007100287 Application by Mitsui & Co, Inc for license to Blport 99
kg U-23S. contained in 3,640 kg UF-6 > to Japan
TAWA.K Mitsui (. Co - Ltd MBK-TR-12 80/0<b/09 Ip
B007100341 Requests assistance in obtaining Itr of assurance for encl
800609 application for Eiport License XSNM-1694 W/D
application
PETERSON, M R Assistant Director For Export/Import & International
Blfeguards BO/06/:?? Ip
B007110010 Faruinrds application by Canadian Embassy for license to
export 4 i 0 S g Pu Metal H74? 8 to Canada
HARRISON, J E Laos BO/06/09 Ip
B007110271 Amend 1 to license for Transnuc lear, Inc. add ing Allied
Chemical Corp as supplier of natural U Qnlij
PETERSON, M R Assistant Director For Export/Import t. International
Safeguards NUK-319 BO-059 BO/07/01 Ipp
8007110275 Forwards application by Mitsui b Co. Inc for license to
Biport 9,459 Vg enriched U heiaFluonde. enriched to max
3 95'/., to Japan
SAIKI.T Mitsui t, Co , Ltd BO/Od/12 Ip
— B007110293 Application by Mitsui t. Co. Int for license to Biport 5.42"?
fcg enriched U heiaf luoride, enriched to mai 3 95'/,, to Japan
* Mitsui Ei Co , Ltd MBK-F3-R6 (A) BO/0&/12 Ip
B007110469 Forwards NUKEM BOOill 1 tr correcting typing error in
supplemental info accompanying 900430 eiport license
application f. NUKEM 80061! Itr to ANL containing addl
supplemental data
MATSONi V Iran anuc lear, Inc BO/Oi/18 7pp
B00711O4BO Requosts amend to license, to import addl 200 g Pu
MATSON,V Transnuclear- Inc BO/06/IB Ip
B007110491 License for Edlnui Intl to to export 0 SO g Pu, as Pu sulfatn
tstrahydrate, to Japan
PETERSON, M R Assistant Director for Export/Import t> Internationa t
Safeguards S-B9-77 BO/06/27 2pp
BOD71i052Q Submits application to omend license to export adding
Fuerios Elfctncas de Cataluna a& ultimate consignee
ROQERS.H F Metal Bel loU5 Corp BO/O6/26 Ip
B00714O25J Foruards Transnuc 1 ear, Inc B0041B '
re B00506 eiport license application W/o e
PETERSON, M R Assistant Director for e«p
Safeguards 80/06/30 Ip
416
NONDOCKETED ITEMS
6007140256 Advises that SUM shall be eiported under general license
regulations effective 80042 1 Application 16 being processed
as component license
WRIGHT, DL Office of International Programs. Director 90/0-1/16
Q007HO596 License for Toledyne Wah Change Albany to eiport 400 Ibi
Zircalog-2 tube shells, to Norway
PETERSON. MH Assistant Director For Eiport/Import i. International
Safeguards BO/06/30 2pp
BOO71402i6 Advises that 15-day waiting period requirement uas mawed
for license applications to eiport byproduct matl !i
components to Ejion West German facility
PETERSON. M R rtaiistant Dnector for El jior t/Impnr t 6 International
Safeguards 30/06/30 lp
--BOO7140374 license for EIIDI Nuclear Co, Inc to eiport one fuel rod
nuclear assay sys tn Heat Germany
PETERSON.fi R Assistant Director for Eiport/lmport !i International
Sate guards 80/06/30 lp
8007MO6Q3 License for Cerac, Inc to eiport 43 94 kg thorium, contained
in 30 kg thorium oiide/to West Germany
PETERSON. M R Assistant Director for Eiport/Impor t !c International
Safeguards 00/06/30 3pn
B 007140696 Discusses IE insp of License XSW1-142t on BOO61Q
Hn noncomp 1 iance noted Major areas inspected compliance u/
requirements of 10CFfl70 I> 71 re packafling of radioactive
matl for transport
NQHDEFIHAUO.L fl Region S. Ban Francisco* Safeguards nrBnch
60/04/33 2pp
8007140233 Advise? that 13-d.aif uaiting period requirement vat waived
for license application to eipnrt byproduct matl t
CDipponents t-o Euan West Barman facility
PETEflSCIN.H R Assistant Director for Eiport/Import & International
Safeguards 30/06/37 lp
--BOQ714030B License for Eunn Nuclear Co, Inc to eiport 1 0? mg Cf-253
neutron source to West Qffrmany
PETERSON, M R Assistant Director far Eiport/Import t, International
Safeguard B BQ/Oi/37 Kpp
B00714Q293 Ainend 1 to I icense. ei tending eipiration date from 901101 to
BI1I01 & adding two suppliers All other eiport conditions
remain unchanged
PETERBDNiM R Assistant Director for Eiport/Jmport b International
Safeguard! BO/06/30 pp
B007J40339 SEC V-S 0-301
Requests rifvieiii of proposed issuance of license for OE to
export components to Finland Equipment destined for country
not previously flutborlied to eiport per Nuclear
Nonprol i Peratipn Act of 1970 Recommends issuance
5HEA.J R Office of International Programs, Director 00/06/20
3pp
— BQ0714Q546 Fin-yard 5 application For license to eiport components to
Finland Ltr of assurance & draft license encl
HILSOM.B fr General Electric Cu uDW-90013 BO/01/30 3pp
8007140353 BECY-8Q-294
Informs of Eiecutive Branch response on pending license for
UnioEi Carbide Corp to eiport U-H35 to France
SKEA.J R Office nf International Programs, Director SO/Oi/IB
IP
B00714071I License for /Udrich Chemical Co to eiport 1 kg dtuteriun,
contained in 9 kg deuterium oiid», to South Korea
PETERSON, H R Assistant Director for Eiport/Import fc intirnBtlonal
Safeguards 14/EJO SO/07/05 2pp
BOD71SOD01 Forwards application for eiport license for minor nucleor
• iport Ltr of assurance required H/o end
PETERSON, K R Assistant Director for Eiport/Import d Intirnatlotial
BaFiguards GO/07/03 lp
8007190003 License for Sigma Chemical Co to eiport 1O kg deuterium
oiide to France
PETERSON, M R Assistant Director for Eiport/Import & International
Safeguard* D-49 00/07/02 2ap
800715000B License for Aldrich Chemical Co to eiport 1 kg deuterium
oxide to Neiu Zealand
PETERSON- M R Assistant Director for Eiport/Import 1< International
Safeguards 10-BO QO/O7/Oa Spp
8007130013 License for Aldrlch Chemical Co to uport 1 kg deut*riuni
contained in 5 kg deuterium otiie,to Veneiuela
PETERSON. M R Assistant Director far En port /Import b International
Safeguards 11/80 80/07/O2 2pp
B007 130030 Cancels Eiport License Application XBNH-14B6 ilnce Matl can
be eiported under licensee general license
HIJIQHT.B L Office Df International Programs, Director 80/0i/30
6007150034 Cancels Eiport License Application X8NK-1&31 line* matt can
be eiported under licensee general license
L Office of International Programs, Director 00/06/30
— 8007140560 Ciecutive Branch position re application bij Union Carbide
Corp to eiport 9 95 fcg U-23S, enriched to t3/. U, to Trance
License should be issued Ltr of assurance encl
NOBCNZO.L V State, Dept of, Bureau of Oceans t. Internati Environ
* Scientific Affairs 60/O6/11 2pp
B00714OS67 Forwards application for e«port license For minor nuclear
export Ltr of assurance required
PETERSaN.MH Assistant Director for Eiport/Import (. International
Safejuords BO/Od/27 lp
B007J40S77 Amend 1 to license For Radium Chemical Co Inc, entenifing
iiplratlon date from BOOtOl to 310701 t< permitting change In
intended distribution of tritium gas
PETERSON-M R Assistant Director for Eiport/Impnrt t, International
Safeguai-df SO/07/03 lp
BOQ71-40371? License for Uestinghouse to eiport proportional counter to
(IB used as neutron detector For neutron source strength
determination in GUSH research reactor, to West Germany
PETERSON, M ft Assistant Director for Eiport/Import & International
Baf*ouardB QDy07/03 lp
B0071-IOSB3 Forwards Eiecutive Sranch responses on pending applications
for Eiport Licenses XSNM-1431 li X<;NH~1S64 UJhich reouire
Commission review Final review should begin as soon as
potnible H/o enc Is
SHEA.J R Office of Internat innal Programs, Direttor 80/07/01
lp
B00714O5&& License for DDE to Export U-939, contained in 27 i Ig U, to
Urst Germany
PETERBOM, M fi Assistant Direttor for Eiport/Import fc International
SaFeguards QO/07/O3 2pp
B00714058B License for Isotope Products Lab to eiport Ig Cm-244, solid
curium me-tal oaide.to France
PETERSON, M R Assistant DlrBrtor for Eiport/Import !. International
Sflfeguarrfs 80/DA/30 2pp
B00713QO36 Discusses Transnuclear 800914 application to export 103 233
kg Ur enriched to 93 3'/. U-333, to Wilt Germany for conversion
by NUKEM t, fabrication at Hob eg into THTti furl Foruards Itr
justifying need for highly enriched U
MENNKKEN, J H Euratom Supply Agency (Del glum) BO/06/23, 4pp
— 8007150040 Provides technical background inPo necaiiaru, for US
evaluation of technical &• economic juitlf Icatton far
Trininuclear eiport of h-lghly enriched U to H*it Oernanij
to fuel THTR reactor
r1ATZ,0 . MUU-ER.H Nukem OmbH 80/09/21 6pp
H0071S0039 Cancels Eiport License Application XSNM-14B7 vine* matl can
be uported under llcenfe*- general license
URIQHT. D L Office of International Programs, Director BO/Oi/30
IP
8007150050 BECV-BO-a9B
Recommends return of Rockue1!! Intl application for license
to eiport specially-designed valve to India ui/o action
Eocutive Branch prefers mturning u/o action as opposed to
denial due to political differences Involved Draft Itr end.
SHEA.J R Office of International Programs, Director BO/06/19
ipp
B0071B0062 Forwards application for eiport license for minor nuclear
eiport Ltr of assurance required 14/0 encl.
PETERSON. M R Assistant Director for Eiport/Import & International
Safeguards 80/07/OS lp
B007190063 Litenie for Aldrieh Chemical Co to export 3 kg dnuteriun,
contained in 20 kg deuterium oxide, to Belgium
PETEDSQNiM R Assistant Director for Export/Import & International
Safeguards IS/BO 80/O7/O2 2pp
NONDOCKETED ITEMS
417
BOQ715Q073 License for Transnuc 1 ear. Inc to eiport 32 737 kg U-335,
contained in 35 OSB kg U, to Sueden
PETERSON. M R Assistant Director for E. port/Import b International
Bafesuards BO/O6/3O 2pp
800713007B License far Transnuc 1 ear. Inc to eiport 67 736 tig U-233.
contained in 72 6 tg U. to Prance
PETERSON, M R Assistant Director for Eiport/Imporl t. International
Safeguards BO/06/30 2pp
S0071303.33 Forwards supplemental Info on inventory, forwarded directly
to US Dept af State by Euro torn Supply Co
MATBQN, V Transnuc 1 ear, Inc BO/06/ IB 3pp
8007130836 Forwards Eiecutlve Branch response dn pending application
to * I port Pu & U to United Kingdom Application mill require
Commission review Application 5> amend encl W/o encls
SHEA. JR Office of International Programs, Director BO/06/27
IP
BQ07160394 Forwards application by Monsanto Research Corp for license
to eiport one neutron source Model 2763. containing approi
1 ng Cf-232, to India
HOADLEY.S D Monsanto Research Corp 19I-9AO(l> 90/07/01 lp
— 0007160397 Application by Monsanto Research Corp For license to eiport
one neutron source Model 2765. containing approi 1 mg Cf-252,
to India
to India
HOADLEY. S D
Monsanto Research Corp L91-'?AO(I> 80/07/01 lp
8007140403 Application bij Altfrieh Chemical Co, Inc For license to eiport
1 kg deuterium, contained in 5 kg deuterium oiide.to Jamaica
EDELSTEIN, B Aldrieh Chemical Co , Inc (subs at Signta-Aldr ich
Corp ) IS/BO BO/06/27 lp
SOO71&OB02 Ltr of assurance Pe TransnucUar. Inc BOOSS3 application for
license to eiport 704 997 kg U-233, contained in PI. 0417 kg
total U & 0 034 kg U-233. contained in 1 kg total U. to
Switzerland
HOLLER. R E SuitierJand 6S1 313 BO/O6/17 lp
H007140B24 Cancels Eiport License Application XSNM-1549 since matl tan
be eiportBd undir general component license
WfllCHT.B L Office af International Programs. Director BO/06/30
IP
B00717Q323 EiBCutive Branch po-sition TB OA Co application For license
to e.port 1 033 kg U-B35, contai nod in 5 2 *g U< to Taiwan
Ltrs of assurance one 1 License should be granted
NOSEWZO.L V State. Dept af. Bureau at Oceans fc Internet! Environ S.
Scientific Affairs BO/06ME Spp
8007170229 Ltr of assurance re Tr ansnuc ] E.ir. Inc E00523 application for
license to eiport 704 797 kg U-235, cnnta ined in E 1 , 041 7 lg
total U t- O 034 fcg U-239, contained in 1 IIB total U, tn
Swi tierland
MARCHAL.J European Commun i t i us, Commission of QO/Q6/13 lp
0007170235 E.ecutWB Branch position re Gladu Corp application for
license to eiport 40.000 Ib Zircaloy-4 trei tubes to Taiwan
Ltr of assurance end License should be granted
NQSENZO.L V State, Dept of. Bureau of Oceans & InteThatt Environ 8.
Scientific Affdirs 60/06/12 4pp
0007170244 BECV-BO-317
Foruards EiecutivB Branch responses r» tuo pending eiport
license applications for Taiwan
SHEA.Jfi Office of International Programs, Director BO/07/01
— B007170251 Foruards Eiecutive Dranefc analysis re Wea tingji OUBB
application for license to e.port fl, 943 kg U-239, tonta inafl
in 325.832 kg U, to Caiman
NDSENZQ, L V State, Dept of. Qureau oF Oceans J. Intornatl Environ
t Scientific Affairs SO/O6/12 13pp
--B0071702S8 Application by West i nghouse for license to eiport U dioiido
sintered pal lets, encapsu lated in sealed Fuel rods t<
assembled into fuel assemb 1 i ea, to Taiwan
» MEStinghouae Electric Corp 109-7833 79/11/17 lp,
B007170235 Executive Branch position re Tech Aid, Inc application Cor
license to eiport B.613 343 Kg heavy ua t er to Taiuan End
use statement encl
HELFRICH.O F State, DBpt of, Qureau of Ocean* !. Internal! Envifon I,
Sclontific Affairs BO/O6/HA Spp
— B00717O262 Foruiards supp 1 omcntory and use etiitcinent TD opf 1 i cot 1 on For
license to eiport 4 tons heavy utatcr to Tat wan
UU.K Coordination Council For North American Affairs 00/O3/14
20P
6007170003 Eiecutive Branch position re Tech/Dps application for
lic«nse to eiport 5, OOO lia depleted U. In form of metal
ihi*ldlng to Albania, Bulgaria. Ciechosl ovak la. West Germany.
Hungary. Mongolia. Poland & Soviet Union
NOSENZD. L U State. DBpt of. Dureau of Oceans b Internatl Environ &
Scientific Affairs BO/07/07 2pp
B00717007H Eiecutive Branch position re Edloiu Intl Co application for
license to e.port 1O,000 Ci tritium in bulk gaseous form to
Canada License should be granted
NOSENZO.L v State, Dept of, Bureau of Oceans I, Internatl Environ b
BcisntiPic Affairs BO/07/03 2pp
BO0717O077 License for Sigma Chemical Co to eiport 10 kg deuterium
oiid» to New Zealand
PETERSON, M R Assistant Director for Eiport/lmport t, international
Safeguards BO/07/QB 2pp
B00717OO80 License for Mestlnghouse to eiport three compensated
lonliatlon chambers to France
PETERSON. M R Assistant Director for Export/Import & International
Safeguards BO/O7/OB lp
800717O176 Response in opposition to Ctr for Development Policy BO0613
petition to intervene re nuclear reactor export to South
Korea If petition granted, public hearing must be rejected
per applicable statute ti regulations U/Certlf icate oF 3ve
BECKERiJ M Office of the Eiecutive Legal Director BO/07/14
24pp
B007170191 ResponsB in opposition to Ctr for Development Policy B00613
petition to intervene re nuclear reactor eiport to South
Korea Public participation mill adversely affect public
interest Certificate of Svc encl
BETTAUER.R J State, Dept of BO/07/tfl 30pp
BOO7170204 Eiecutive Branch position re Halprln Supply Co application
for license to eiport approi 133 mCi tritium to Singapore
License should be granted
HOBENIO,L v State, Dept of, Dureau oF Oceans t, Internatl Environ t,
Scientific Affairs BO/06/1S Zpp
8007170593 SECV-SO-318
Recommenils approval of proposed license to allow Nlssho-Itual
American Corp to e.port 47 162 Kg U t 41 O-03 Kfl 11-235 to
Japan
BHEA.JR Office of International Programs, Dlrirctor B 0/07/0 1
Spp
— BO07170534 License for NS ssho-luaj American Corp to inport fl4 Don kg
U-233, contained in 47 162 kg U, to Japan
PETERSON, M R Offico nf tnternati Una 1 Proorams, Director
BO/07/01 2pp
B0071B0449 Foruiai ds application for license to
contained In 1 236 g U, to France
KEENAN.R P MestlnghouaB Electric Cnrp ICU-Q456
part 10 g U-B33,
BO/06/1? lp
--B0071B04S3 Application by WpBtinflh oust for license to Hiport 40 j>
U-335, contained in l,22fa g U, to France
KEENAN.R P Uestlnghousc Electric Corp ICS-O^St BO/Od/I7 lp
B007H 10009 6ECV-BO-316
Recommends issuance of proposed license For Tranunuc 1 cofi Inc
to eiport 39 077 kg U, enriched to 93 3Xi to Japan Foruardo
Eiecutive Branch views re proposed eiport
BHEA.JR Office of International Programs, Director flO/07/01
Spp
"8007310076 Foruards Eiecutivo Branch position re Transmit 1 ear. Inc &
Nlssho-luiai American Corp applications For liconsos to
eiport U-233 to Japan Licenses, stum-itl be conditioned ai
noted
NQSENZO.L V State, Dept of. Bureau of Ocann& t, Ititnrnatl Environ
fc Scientific Affairs SO/01/H9 6pp
—8007210D83 LlcenBe for Ti-ansnuc lear, tnc to eiport 39 O77 ku U, Bnrlche
to 93 37,: to Japan
PETERSDN,M R J"i5tant Director For Export/Import t, Internal! nnal
Safeguards (lUK-a31 79-149 BO/07/01 Spp
B007310073 Eiecutive Branch, position re DQ6 application for llcens* to
eiport 3 37 kg U-P35. con tain e-d In 27 1 kB U. to Went Oermanu
Ltr of assurance encl Litense should be granted
NQSENZO.L V State, Dep t of,
ScientiPic Affairs BO/06/)]
au of decani (, InlLornatl Envtron
3pp
418
NONDOCKETED ITEMS
QOQ7310Q9A Eierutive Branch position re Wes C i iijjbouEe application For
license to ciport B. 045 I g U-333, contained In 325.323 hg U,
to Taiwan Ltr of assurance end Licenie should tie grantnif
NOSENZO.!- V State.Dept of, Bureau uf Oceans t. IntPi'natl Environ !<
Scie-ntific Affairs aa/OAM2 l3pp
0007340030 Forwards application for license to export 41 99 g U,
tcntainlns 0 17 a U-233, 1 11 5V g U, c ontaining O 34 Q
U-333, to Japan
SHJHAiB Mitsubishi International Corp <iub& of Mitsubishi Corp.)
BO/06/20 Ip
aOQ7S10124 Amend 1 to liconso TDV [Torii-Warnifr Corp iocruaaino value of
equipment {, eitending oipiration date
PETEREDNaM [I Assistant Director for Etpnr t/ Import I- International
Safeguards A4<73fc5H BO/Oi./27 Ip
aoO7B10lH9 Application by Sigma Che/nlcel Co For licentu to eiport
com.pouinn'B containing deuterium to Australia
6TERH, W C Bifiina Chemical Cn (subs of GiBma-AldT 1 c h Corp » D-47
00/0-6/S3 Ip
eoQ721031fa Apjillcatipn bu ReutBr-ato k en. Inc For licor," to eiport
radiation detectors, Modal HS-U..-O201-S31 , to Spnln End USB
statement end
* Heuter-Btokos. Inc ao/OA/30 2pp
— 8007210318 Advises of dosiro not to apply for eitenslon of License
XSNM-1S97. du-e ID deletion cP requirement Por SNM llconse for
det DC tore
EECKHOUir,A Rou t&r-Bto!( us. Inc 30/0,6/30 Ip
8007330107 Amends Licenae ISNM-1A°9 author 1 1 Ing import of 343 SI kg at
U, containing 103 7H kg U-231 b 345 3 9 of produced Pu
Proposed amand represents Tin substantial change to
circumstances irwolvtJ In issuance of basic License
HDDRE-N Office of Internationa] Programs, Director 60/07/O3
Epp
— B0072201H Amends Transmit 1 oar Inc License IHNM-1A79 Increasing
quantity af Pu authoriied for e-Kporl to Sfl3 3 g
PETERBnWiM Fl AsBistant Director Por Eip-ort/Import ti Internati onnl
Safeguarda BO/O7/03 Ip
8007230307 Addl responsB to FOIA request For documents re proposed
nurlsar reactor-a Intate-d near Qyaeinai Korea Toruorda Jfi Bh*»
draft momn ti> Comml sa ( onerit aeCV-BO-ay? IB located in DC
PDF) Info partially ulthlield iref FHI/t Eismption 51
TELTflM.J H Diviilon OF Rult» and Record* BO/07/13 Spp
— 0007240036 Application hg llltnubiBhi Intl Cqrp for lietnse to export
41 59 g U.containing O 47 d U-S3S t- 41 59 fl U, containing
O 34 B U-333i to .Japan End USD statemont and
SHIHAi 3 Mt tsub iBhi Internationa I Carp <sirbs of htittubivhl
Corp ) 80/06/20 3pp
D007B4004S Requosts Eiocutlvo Drdiich position r* Reutep-8tolc*i Inc
application Par llcenae ta Biport c omp nnnnts for research
reactor to Mei ico
PETEfiSQNjM B rtsBlstant Director for Export/Import & International
Safeguards 00/07/07 Ip
0007340046 Informs that llconoe application for iiport of B 3 metric
tons of hoavij water ta Tfliujati Is being returimt NRC hat
ricelverf Info thot matl Is no longer roqulred by cuitomir
ilnci project has biran cancelled
PETERSONiM R Asslatant Director for Eiport/Import tc International
S*F«guardi! 00/07^09 Ip
0007240032 Notlf IBS that neuter-Stoke* Inc has requested withdrawal af
•iport license application
PETERHON.M R flssistant Director Por Export/Import t. International
Safeguards BO/O7/1O Ip
Q0075400Q9 OiscuiBBi 1C insp at Import License IHNM-79009 on FJD0411 Ho
noncompl lancu noted Major area a inspected selected exam of
procedures Si recordsi IntBrvieuin u/porsnnnel 8< obtervationi
by inspector Portiam withheld (ref 10CFR2 790)
HARTIM, M 0 Region 1< Phi ladelph laP BafeguardB "ranch 00/05/20,
— FJ0072400Q9 IE Insp Rvpt 11-^95/00-03 on Q00411 No noncompllanct noted,
Major areas Inspected irradiated fuel sh Ipmenti generltl
requlroment* Far transportation Portions withheld
(r*f 10CFFIS 790)
SMITH, OC Heglun 1. Philadelphia, Office Of the Director
DEVLIN, J W Roglnn I, Ph i 1 atfelph ia- Bnfujujrds Branch 80/09/13
— Q007HS02I4 Draft Comml sston papor re licensoo for OC to expor't tuo
feac torsj KMU 7 •!< P to KOTBB Reactors uautd bo located on
Ot|dems Foruiards final Eiecutivo Branch vLeuii Info partlallg
utlthKald (ref FHIA Eienption 3)
SHCAi J, H Off i CD of Intorna tkoni 1 Programs, Director BO/O7/13
3pp
Reiponne In oppostclon to Ctr fur Lau tt Development PoH
000413 petition to intervene rn licanao Por root tor export
to South Korea Issues raised re environ Impacts In foreign
caumtrits ere beyond NRC /url sd Ic tlon W/Cnr tlflcfl to of Bye..
CDUArt.O I . HCNRICH.J R Uei tinohDUBB Electric Corp CQUANj D I
Eeknrt. SoamanB, Chertn A Mullott 00/07/14 19pn
I007Z305B7 Foruard* TB notice of applications for «iport llcannRt
received
BBEA, J R Office of I ntornnlldnal PraoramB, Direttor a(J/07/O3
-BOOTH 30 3i ;. Notice of appl i calioni for eicnort licenafff received
BHEA. J R PFfice of Internal 1 onal Pragr«iir>i. Director 00/07/03
i007B30t02 Rcspon** in oppoeltlon to Ctr far Development Pollen B00t>30
petitions to intervene re «Un(fing as mattir of right NF1C
ulll submit npinlon ro poeilbill tg af ili *cr»t loraory boarlng
• fttr E<Btutlvu HrancJi vieus CortlPltate at Bvc one 1
BECKER. JM Qfftre of the Ciocutivu Uugal Director EJO/07/10,
13pp
D07230719 Pl&cusses application for Ucunao to eiport unste gal mgt
treatment igs tn Sou til Africa flpjil Icrat ion hat been foruardeil
to US Dept oF Cuinmsrce uihicli nr, Btimutl U-cunsinfl »uthoritij
aver such Items an 800635
PETERBONrM R Assistant Director Por E« par 6' Import fc Interra tioiidl
fl»feflu-ardB 00/07/16 Ip
J-07330723 Dlscusse'S application For U(eiiie to eiport tuo p*nannBl
air locks to South Africa Application hai been forwarded to
U3 Dept of CDnmerOi uhich *ssumecl licensing authnrlty over
tuch items DTI a 00 i 25
PETERSON. M Fl Assistant Director For Export/Import & International
aaf>guar<U OQ/07/ln Ip
0007240224 Forwards application For ItCDnse to Import GO. 000 kg U,
enricheJ to IDSS than 3 9X. U-23S, From UBBH
HANSEN, L E Eunn Nuclaar Co . Inc (tubs of ETixon Carp )
UQ/06/33 Ip
— S007240?47 Application by Gnon Nuclear Co. In* for license to impori
30, 000 kg U. containing up to 2,000 kg U-233, Prom UBSR
ilANSEW.l- E Enon Nuclear Co . Ine <«ubs af E«xon Corp )
QO/06/23 Ip
0007240363 Liccnim for Ed 1 ou Intl Co to eiport 10,000 Cl tritium gas
to Canada
PETERSON, (1 R Assistant Director for Eiport/Import tt International
BlF»guard* BO/07/15 Ip
0007340370 ftmand 1 to licence for Nlssho-Iunl Am«rican Corp eilendlns
eiplratlon ilate from OOOQ01 to BiOBOl
PETERSON, H R Assistant Director for Eiport/Import t. International
Bafejuardi MACPJ S493HV QO/O7/1& Ip
0007340373 Llcen»« for DOE to eiport 6 43 kg U-239, contained in 32 6 kg
U n« tali ta France
PETERfaON.HH Atsistnnt Director for Enpoi-t/Import k International
gnPtguard! QO/07/11 Spp
B007S40-37? License for (9E to export 31 neutron det»etors, Model NA-200r
to rinland
PETER60N,H n Assistant Director Por Ejport/Imnort & lnt«rnation«l
Safeguard) HDU 0001^ 00/07/13 Ip
0007210409 License for Ml siho-Iuai American Corp to eiport 44 003 kg
11-233, contained in 47 162 kg U metalj to Japan
PETERSON, » R Assistant Director Por E»port/Imporl (< internationjl
SafBgoardl N1AC-7Q-11OG BO/O7/14 2p|>
00107340410 License for Htotinghouse to export 40 9 U-H35. contained in
1.22* g u In 30-A eye 1 ind er. to France
PETER60N. M R Assistant Director for Enport/Import It international
Safeguard I 1CB-Q456 BO/07/1 B 2pp
0007340418 License for Tran*nucloa,ri Inc to e»port 704 997 kg U-a3S,
contained In SI, 044 7 kg U. t 0,034 Ig U-333, contained in
1 kg U. to Builtierland
PETERaON.rlfi Assiitant Director for Export/Import li International
Safeguards RQU 331 BO-1201, 80/07/1-4 2pp
NONDOCKETED ITEMS
41
8007240431 License For Canadian Embassy to eiport 3 g Pu to Canstfa
PETERSON. M R Assistant Director for Eiport/Import & International
Safeguards 00/07/14 2pp
8007240134 Application by Eitl ou Intl Corp for license ID Biport SO
mUroorams Pu-242 in tracer solution to Japan
HARMON, D W Edlou Intel-national Co SHIB-4 BO/O6/30 Ip
8007240440 Eiecutive Branch position re QE application for license to
•>port neutron detectors to Finland License should be
granted
NQSENZO.L V State. Dept of. Bureau of Oceans !, Internatl Envirc-n !.
Scientific Affairs 80/07/07 3pp
B00734O447 Ltr of assurance re Westinghouse licens
U-235, contained in 1,386 g U, to France
MARCHAU. J European Communities, Commission of
to eiport 10 g
00/07/09 Ip
BOQ7240472 Foruiards BOO7O2 Itr of assurance re application for license
to e«port 40.00O 16 Zircalou-4 trei tubes to Taiiuan
DGAN.D Taiwan (Republic of China) 80/07/07 2pp
B007S5003Q Discusses application for license to aiport inservice insp
lus to South Africa NRC forwarded application to US Dept of
Commerce, uh ich assumed eiport licensing authority over such
item! on BOO 62 5
PETERSON. H R Assistant Director for Ei port/Import t. International
Safeguards BO/O7/17 Ip
BOO 72 50033 Discusses application tor license -to e«port four sets of
personnel air lock* to South Africa NRC has forwarded
application to US Dept of Commerce, uh ich assumed eiport
licensing authority over such items on 8O0623
PETERSQN.M R Assistant Director for Eiport/Import fc International
Safeguards BO/O7/17 Ip
8007250041 Discusses application for license to eiport ultrasonic
Insp sys to Argentina NRC has forwarded application to US
Dept of Commerce, which assumed eiport licensing authority
over such items on SQO625
PETERSON.M R Assistant Director for Eiport/lmport (< International
Safeguards BO/O7/16 Ip
B007SS035S Ltr of assurance re eiport of 213 kg U-235, c ontained in
6, 199 ICQ U, to Japan
MIYABAYASH1.M Japan 80/03/27 Ip
8007250563 Foruiards GE BO0617 Itr re license application HVo end
PETERSON, M R Assistant Director for Eiport/Import t International
Safeguards BO/O7/15 Ip
BOQ725065i Forwards draft Commission Action Papers ft applications for
exports to Taiwan Requests comments as soon as possible
SHEA, J R Office of International Programs. Director HO/O7/1S
8007250685 Response in opposition to Ctr for Laui b Development Policy
800&20 petition to intervene Legislative history of Hue 1 ear
Non-Proliferation Act provides guidance TV public
participation W/Certi f icate of Svc
COWAN, D 7 , KENR1CK.J R Hestinflhouse Electric Corp COWAN. B Z
Eckert, Seamans. Ctienn & Mellott BO/07/21 13pp
8007350714 License for Sigma Chemical Co to eiport 10 kg deuterium
glide to Australia
PETER80N.H R Assistant Director for Ei port/Import b International
Safeguards D-47 BO/07/14 2pp
BQ072B007B Returns B00314 application for license to. e»port valve to
India due to Executive Branch position that proposed oiport
does not meet Atomic Energy Act criteria U/o encl
9HEAj J R Office of International Programsj Director BO/Ofa/14
»P
B007SB0117 Amend 1 to license for OE changing name of ultimate
consignee to StudsviJr Energiteknil AB. in Sweden
PETERSON, M R Assistant Director for Ei por l/Impoi-t It International
Safeguards BDW 79202 80/O7/17 Ip
8007380131 Confirm* telcon that <|ual i Pi cat ion program Par subj litense
will require 4& DWR fuel segments. of which 20 mill be
unlrradlated
HILSON.D D Oeneral Electric Co BDW-B0067 SO/0&/17 Ip
80072B0223 Application by neuter-Stokes, Inc for license to eiport one
fission counter, Model R3-P&-160H-1 to. to Uraguay
SKWIUPA.vJ D Reuter-Stofces, Inc SO/07/22 ipp
B0072HO2B9 Furiuards SO07O7 flpp 1 1 1 a tion >< proposed ] irensc for EJport of
90, BOO kg depleted U to Canada Efetutivu Branch position not
required License nil 11 be issued W/D and
PETEnBCN,M R Assistant Dnector for E.p ort/Impart t. International
Safeguarda BO/O7/I5 Ip
BQ0733Q3t3 Returns 730519 application for license to eiport 40,000 lo
Zircaloij-4 trei tubes to Taluian due to American Inst B00702
cancellation of order
PETERSON. M R Assistant EnEctor for Eip or t/Imp ort >. International
Safeguards BO/07/15 Ip
8007380360 Forwards application for license to eiport spare parts u»ed
in refueling iija that loads or unioa^a Fuel slejnents into
reactor to C a nan da
BCHAUD, J B General notors Corp BO/O7/O7 Ip
— B0072aO36i Application by General Motors Corp for license to eiport
spare parts in refueling ^s that loads at- unloads fuel
elements into reactor to Canada
SOKOLOWSKI, O General Motors Ctirp B3344 BO/O7/G1 Ip
B007ECO372 Application by He at inghousc far license to eiport one
compensated icniiation c hamber. Model ML-530B4, t-D Japan
PACHAL.W F Wostinohouse Electric Corp ZE-6OIB5 flO/07/OS 3pp
BO072B03B3 Applicatiun by Air Products tf Chemi calfi, Inc for license to
eiport S4 3 g deuterium to United Kingdom
AIT Products !^ Ch emical a, Inc 80/07/09 2pp
SOO7280393 Appl i tat ion by Sigma Chemical Co For license to export
compounds containing deuterium to France
3TERH, W C Sigma Chemical Co IsubE of Si gma-Al drich Corp ) D-4.8
BO/O7/10 Ipp
BO072B039? Forwards application to etpnrt 198,300 11 depleted U,
contained in 200,000 lb depleted U (0 75V. titanium olltujedt,
to Canada
6CHAEFFER.M R RM! Co , RH1 fitaniura SO/07/07 Ip
— B0072BO4Q3 Application by Fthl Co - Eitrjsion Plant for license to
eiport 19B. 300 lb depleted U, contained In 200, OOO Ib
depleted U (0 73X titanium ello^eOJ.to Canada
SCHAEFFER.M R RMI Co , ftMI Titanium HO/07/07 Spp
80072B04O7 Requests smond to
consi gnee
UILEON, B D General Electric Co
pott license to reflect new ultimate
HO/Ofa/17 Ip
8007250464 Requests amend extending export lic
YAMANA. K Nissno-Iuiai American Corp MACPJ
SO073B0473 Requests import license to reimport 10 kg highly enriched
U-S35, contained in 33 fuel e 1 pmenta, al o-ng u/recovered scrap
matl. Prom France
DALALI5.C 0 Union Carbide Corp 80/07/02 Ip
BO07HB0517 Requests Eiecutive Graneh pusitton re Monsanto Research Carp
application for license to eiport Cf-252 neutron tourcB to
India
PETERSON. M R Assistant Director for Export/imp ort (< I nternatinna 1
Safeguards 6O/07/1O Ip
8O073B0535 Requests Eiecutlve Qranch pnsition re Transnuc lear, Inc
application for license to eiport BNM to TJi e Netherlands
PETERSDN.M R As-sistnnt Director Far Export/Import fc International
Safeguards an/07/14 Ip
HO072BO335 Requests Eiecutivt Qraticli position re Mitsubishi Intl Corp
application For license to export SNM. in form of Hake tubes,
to Japan
FETERSON,M Fl Assistant Dnector for Export/Import S. Internatiotial
Safeguards BO/07/14 Ip
B 007 360 34 7 Eietutive Branch postti-on re Uest inghcuau application for
amend to eiport license eitendin-g eipiralinn date to
B11231
NOSENZO.L V StatB.Dept of, Qureau of Oceans !c Internatl Envtron ti
Scientific Affairs BO/07/OS 2pp
eOQ73BO55"? Eiecutive Branch position re Edlou Intl Co appllcat' —
license to eipart 3 3 <ng Cf-B5S to East Oermanij License
should fee granted
N06ENZD.L V State, Dipt of, Bureau of Oceans t. Intm-natl- F
Scientific Affairs 60/07/11 2pp
420
NONDOCKETED ITEMS
BO07aB05(>9 Amend I to license for Integrated Photomatr 1 1, Int changing
quantity, from 52B micrograms U-335 to 53B mg U-235 (99 9X
enrichment )
PETEnSQH, H R Assistant Director for E. port/ Import ti Internet I ntial
Safeguards BQ/O7Mq Ipp
BOO7290035 Sutimits application For license to import 15,000 kg U,
containing !T25 kg U-^35. from France
MAT90N,y Tran-inuclear, Inc SO-152/02 B&/07/03 3pp
B00731QO44 Submits application to amend license to eitund expiration
date to B31001
WILSON. B D General Electric Co lSOW-aOQ73 BO/07/O7 lp
0007310066 Submits application to amend license to eiport 28 •laments
consisting at fceven strings of Four detectors each, to Unit
Germany
HILSONiB B Oeneral Electric Co , Nuclear Energy Products Dlv
BDH-BOOBO BO/07/ 15 lp
8007290027 Submit* app 1 1 cat ion for 1 icons? to import 14,000 kg U,
containing HO kg U-E35, from France
HATSON.y Transmiclear, Inc BO-IS1/01 BO/O7/07 3pp
0007290044 Acx receipt of BOO106 1 tr f nruari) ing Eiecu-tive Branch
position re He* t inghousu application to eiport tuo pnuer
reactors to South Korea Questions impact of recent political
fleve lopmonta on eiport"
BHEA.J Fi Office of Internal i onal Programs, Director flO/Ofc/3i
IP
900729021S Responds to 7BO729 request for Eiecutlv* Branch position re
Qladii Corp application to eiport 40. OOO Ib af Zlrcalny-4
tubing Applicant abandoned request on 80O708
HELFRICH,ff F State, Dept ofi Bureau a f Oceans (< Internatl Environ !i
Scientific ftffaira BO/07/II lp
S0072?03CJO Submits application for license to import 40. OOO kg U,
containing 140 tg U-235.from France
MAtaON. V Transnuc 1 ear. I nc BO-1 SO/02 8O/07/07 3pp
9007390446. Forwards application by Transnuc 1 ear. Int for license- to
eiport SO OSO Jig U, c onlflining IB 707 kg U-235. to The
Netherlands
MATSON. V Trananocleairj Inc BO/O7/03 lp
— EQ0729045H application oy Ti an&nuc 1 Ear, Inc for license to export 20 OSO
fcg U, containing 13 7O7 kg U -235. to The Netherlands
• Transnu clear- Inc {Nim-333)BO-149 00/07/03 Ipp
0007390460 Forward 5 application by Marubeni America Corp far license to
export 156.333 kg U, contain i ng 3,496 kg U-23B, to Japan
MAKAIiT Marubeni America Corp (subs of Marubeni Corp 3
MAS-740B BO/07/11 lp
— 9007390467 Application by Marubeni America Corp For license to Biport
156.333 kg U, containing 3, ABC, kg U-335, to Japan
NAKA.I.T Marubeni America Corp Caubs of Marubeni Corp )
BK-1169/ZK0170 BO/07/11 lp
0007310069 Forwards application for license to export 12 Bamplei af tl
diaiida pellets earh Ljr for five ijrs, each shipment
cQntalmnn 7 s U-233, to Sufi tierland
KEEMAN.R P Meat i ftghnuse Electric Corp 1C8-0512 80/07/01 lp
"H0073I0073 rtppkitation by Westlnghouae for license to e>port 12 sampl
af Y dlaildc pellets each gr far five yrs, each shipment
containing 7 a U-235, to Suiitierland
KEENAN, n P Wflatinghouao Electric Corp FE-201&2 BO/07/01 lp
E0073100B2 Application by Matheson Goo Products For llcinse to Export
Hlie 3 cyl Indor. c ontoi ning 50O liters deuterium to Braiil
FISHER. H F Mathusan Oas Products 393S X BO/07/11 2pp
0007310007 Application bi| Heuter.-atokes for licence to upart 1 4 g U
nioiide on Internal surface of Model (13-03-3310-114
radiation detector, to Canada Ltr of assurance encl
SKARUPA.J D Rcutor-Stokes, Inc V-B317 BO/04/17 2pp
B007310194 Requests Eiccutive Branch position re Marubeni America. Corp
application for license to eiport BNM to Japan
DEVINE. J E Assistant Director for Eiport/lmport & International
Safeguards QO/O7/22 lp
8007310199 LicenEB for QE to oiport miscellaneous replacement or ipare
parts t< components to Finland
PETERSON. M R Aunt ant Director for Eiport/lmport t> Int«rn*t lonal
BO/O7/10 lp
DOO731oaaa Respond* to FOIn i-eo,ueit for documanti re export of SKIM b
r op lac emeu t parts to India Forwards docuraents listed in App
A, Documents luill be placard In PDR
FELTON.J M Division of Rules and Records BO/07/S4 3pp
— 6007310347 Updatos 000403 anolysis of fuol requirement* for T«r«pur I
b II AnalijtiE IB baaed on more detailed d current info
Provides di-Bcussionicanclusionsiiefueling schedule fc
projected operating schedule far reactor 03 Dedl 1 tr end
Office of Policy Evaluations 79/01/16 9pp
S0072'!0'B97 App 1 itat ion by Reactor Ei per imonts, Inc for license to export
63 4 mg \J-233, c an tamed in i*2 5 mg U, to Japan Ltr of
assurance end
x Reactor Experiments, Inc C1B& 30/07/15 2pp
8007ai?OSB2 Foruardi 800329 telci to Sovift Union rv Teijueit for U-309
stifsi to be Forwarded to State D-ept Further communication!
pr development-: per application mill le forwarded
MULLER-L L DFI& Internationa). Inc 60/0ty04 2pp
BOO730Q037 License for Reuter-Sto kes to eaport one radiation detfctori
Model RB-C3-3510-H, to Canada
DEVINE.J D Assistant Director for Eiport/Import tc Internet 1 onat
Safeouordi V-9317 SO/O7/23 2pp
8007300001 Forwards DFc of Njrlcar Reactor Regulation asseBsment oP
potential radiulogical effects of Korean Nuclear Power
Station on glabdl commons ABae&lmont represent* raasonalile
uppertiDund appraisal »f potential plant release*
DENTONi H R Office of Nuclear Reactor Regulation. Director
30/07/01 Bpp
8007310010 Requests that application tn export tritium to Yugoslavia be
ulthdrauni on dehalf of Hadiochemica 1 Ctr
HftHMDN, D M Edlou International Co BO/07/1B lp
B007310230 Prnvide-B aupplementar^ Info re Tarapur reactnr fu«l
requirements, in response to Commissioner Ah tarn a question re
bails far fue-1 fabrication time DOS provided 9-month
fabrication period Inadequate data available for analg»i»
Office -of Policy Evaluations 79/01/1B Zpp
S0073IOafrO LlHta <iiiBfitlons re revisu) of License XBNM-1379 concerrin(
proponnS eiport of 1 ou enriched fuel to India Requvit*
Etecutivo Branch refiponse
SHiHA.J n Opfiee of International Programs. Director 79/03/88
— Q-007310?6(j Forwnrda updated onalg»ls of estimated fuel requirement* for
Tarapur reactor s, reflecting fuol covered bg application
XBNM-1379 H/o end
DEV1NE, J Office of- Policy Evaluation! 79/06/07 lp
— 8007310270 Application by GE for license to export six traverting
intare probe detector assemblies to India
WILBON.B D General El&ctrU Co BDH-7912S 79/05/07 lp
800731 0453 Application by rttttubishi Intl Corp for llceni* to export
450 raCl CF-?32 -cermet wire to Japan
KUQE, T Mitsubishi International Corp (subs of Mitsubishi Corp 1,
P IT-L-18ia 80/07/23 1 p
BC-073100-aB Ltr of assurance re Mi tshuq i shi Nuclear Fueld Co application
far license to eiporl 399 Kg U-a35i contained in 14.000
Kg U. to Japan
rtlYADAYAGH 1 . M Gambia BO/07/14 1 p
BC-073104B4 App lie at ton by Slnma Chemical Co For licenni to export
compoutids containirfl deuterium to Canada
STEdW.H C Sigma Chomicnl Co Uubs of Sigma-Aldr Ich Corp )
BO/07 /S3 lp
6007310039 Forwards application for export license For minor nuclear
export ',tr of assurance requirBd W/a end
EEVINE. J D AsEistant Director f-ur Eiport/Imporl t< Intsrnatl anal
Baf 8 guards BQ/O7/22 Sp
8007310439 Foruiardc application for license to export reactor vttttl
gailietii retaining tlipa tt retaining clip screws to South
Korea
MUlRiH B OabcacH d Wllcoi Co BO/07/1B lp
B007310043 Submit! application to amend license to eitend Bipi
date to BB1001
WILSON.D D General electric Co QDU-B0074 SO/O7/07 lp
NONDOCKETED ITEMS
421
— BQ07310490 Application bij BS.W far license to eiport reactor vessel
flasJiets. retaining clips t, retaining clip screws to Snuth
Korea
MUIR.H S Babcock (. Wilcoi Co 7BB-998Q32-51 BO/O7/17 Jp
BD07310511 Advises that NBS confirmed thdt rnatl requested for o.port
on application it in sensing components installed in
1 n i trum«n t s Enriched U could be eipc-rted under genera]
license Bijprodutt license required tn Biport Instruments
HRIQHT.B L Office of International Programs, Director BO/07,/24
8007310520 App 1 1
A01P U9A. Inc
btj Agip USA Ini: far license tn eiport
ces to Italy End use statement enr 1
-64 J03-c- BO/D7/07 5pp
Q00731O522 Amend 1 to license f
B3JOOS ?, clarifying categoriB
authorned for eipnrt to West
DEVfHE, JD Assistant Direct
Safeguards 60/07/23 lp
GL eitending etpirabion date to
aF parts &< components-
Eiport/Import ti International
The subject category column in this index gives the tj,ooket
number and the symbol for the category of Information
within that docket; for example, 50-320 P. The docket subject
categories are defined in Appendix A.
Subject categories for nondocketed items are also entered
in this column by symbol; for example, ACRS. These cate-
gories are defined in Appendix B and listed in the Contents.
An asterisk following the accession number in this inde
indicates that the document is an enclosure to anoth
document. To obtain the accession number of the prlnclp
document under which the enclosure is listed, refer to th
index entitled "Cross Reference of Enclosures to Prlnclp.
Documents."
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
ABBOTT. M S
8QQ71S03IB*
70-2631
ABERCROMBIE, H
8QQ7Ba0342
30-259 R
ABERCROMBIE, H
8007220431
30-259 H
ABERCRDMBIE, H
BO07110291
30-240 S
ABERCRQMBIE, H
BO07110423
50-296 B
ABERCROMBIE, tl
BO07290B&4
50-259 S
A0ERCROMBIE, H
B007160S52
30-259 R
ABGRAB.K
80071QQ26S»
50-206 R
ABLER, W I
B007O20452
PR
ABOU-SAYfD, I
8O0723D201
HUSEO
ABRAHAMS DM, »
8007140014*
PR
ABRAWSON. P B
8Q07240459
NUREQ
ADftAMS, R
8007110181
PR
ABT. S R
B007170331*
40-8681
ABT, 8 R
BO071S(H91
40-8681
ABT. S R
B007 170302*
40-8602
ABT, S R
8007I80SBB
40-B602
ABT. 3 R
B00728007O
40-B6H1
ABT. 8 R
8007170332*
40-06B1
ABT. B fi
B007 170333*
40-B6S1
ADT, S R
SO07 170308*
40-B602
ABT, 8 R
8007280066
40-B602
AQT. S R
8O071B0279
40-8681
ABT. S R
B0071 B048O
40-8690
ABT, S R
B0071 70297*
40-S602
ADT.S R
B007 170329*
40-86B1
ABUAF, »
£3007180361
RES
ACERRA, L s
8007170214
SO-373 S
ACKERMAN.W C
8OQ7O20i94
40-8502
ACO6TA, A P
Boo7O2ooaa
40-B584
ACOSTA. A P
80Q7Q10305
40-B5S4
ACOSTA.A P
B00721056O
40-B584
ACOBTA, A P
8007290619
40-B584
ADAM. L D
B007310393
50-289 H
ADLER. T A
BQ0714000B
90-389 0
ADLER T A
9007140009*
90-8S9 0
ADLER, T A
6QQ714000B
50-SB9 O
ADLER, T A
8Q07140009*
90-889 O
ADLER, T A
8Q07250680
50-2B9 O
ADLEH.T A
8Q072S06B9
SO- SB? O
ADLER, T A
8007S 50680
50-289 O
ADLER, T A
B0072306B9
SO-389 0
ADLER, T A
000732000-1
50-399 O
ADLER, T A
B 007220001
30-P89 O
ADLER.T A
B 00722000-2
30-889 0
ADLER, T A
8007320003
30-209 0
ADLER.T A
80072205B3
50-289 0
AOEE, J R
8ao73aooaB»
QA999
AGEE. J R
BQ07HQ04B»
OA999
AOEE, J R,
B0071i017t*
QA999
AOEE-J R
B 007290337*
QA999
AORAWAL, A K
B0072100O3
RES
AHEARNE, J F
8007Q10352*
COMMISSION
AHEARNE. J F
8007220373*
40-299
AHEARNE, J F
B 00710031 11
50-302 P
AUTHOR
ACCESSION
NUMDER
SUBJECT
CATEGORV
AHEARNE, J F
AHEARNE, J. F
AHEARNE, J F
AHEARNE, J. F
AHEARNE, J F
800723010B
B007020303
8007020129
B007090104
8007010547
50-32O H
30-32O U
COMHI6SIOW
COMMISSION
90-320 P
AHEARNE, J. F
AHEARftE. J. F
AHEARNE, J F
AHEARNE, J F
AHEAKNE, J F
B0071I034i
B007090O76
8007110266
B00723073S
9007830743
30-320 H
CQHMtBSItJM
COHMIBSION
CBNMIBSIOH
CDimrsaiOM
AHEARNE.J F
AHEARNE, J F
AHEARNE, J F
AHEARNE, J F
AHEARNE, J. F
8007B80157
80072B0722
8007290347
8007080199
B007160716
COMHIBSItlN
COMMISSION
COMMISSION
50-544 U
COH'f I SB I ON
AHEARNE, J f
AHEARIJEiJ F
AHEARNE, J F
AKEARNE, J F
AKEARIJE, J F
BOO 7280162
8007170419
8007110346
S007H0552*
80O711096fi«t
COMKIS51QN
COMrtlBBIQN
50-458 U
50-482 U
SO-49B U
AHEARNE. J, F
AHEARN6.J F
AHEARHEi J F
AHEARNE, J F
AHEARNE, J F
B007110S6B"
B007 110377
80Q71103B2*
S0071103B7-*
80O7H039B*
50-482 U
COMMISSION
COMMIES I ON
COMMISSION
CQMrtlSBIGN
AHEAHNE, J F
AHEARNE. J F
AHEARNE, J F
AHEARHE.J F
AHEARNE. J F
8007110533
8007140050
B0071 40062*
8007140120
600,7240037
COMMISSION
SO -320 U
50-320 U
COMMISSION
COMMISSION
AHEARNE, J F
AHEARNG, J F
AHEARNE, J F
AHEARNE, J F
AHEARNS, J F
8007240034*
G0072403G3
8007250205
8007110K97*
8007250079
COMMI6BION
70-21S3
COMMIES ION
COHMIBSION
COMMISSION
AHEAflNE, J F
AHEAIlWe. J F
AHEARNE, J F
AHEARNE, J F
AHEAHNE, J F
80072SODB2*
80073SOOB3*
B007250D89*
800725009 B*
8007250101*
COMMISSION
COMMISSION
COMMISSION
COMMISSION
COMMISSION
AHEARNE, J F
AHCARHE, J F
AHEARNE, J F
AHEARNE, J F
AHEARNE, J F
Q007230109N
B007aS01U»
S007B5011B*
B007240480
80072404B10
COMMISSION
COMMISSION
COMMIBBION
COMfllSalOM
COMMISSION
AHEARNE. J F
AHGARNE, J F
AHEARNE, J F
AHEARNE, J F
AHEARWE.J F
8007a404B3»
8007240ia7»
80Q7E40491*
8007240473*
9007340496"
COMMISSION
COMMISSION
COMMISSION
CQMMIBSIOM
COMMISSION
AHEARNE, J F
AIRQLA.E D
AKERS. D W
ALBOSTA, D
ALDEN.W M
80O7240-497»
8007280139-
B007290217
8007160634
8007180433*
COMMISSION
OA999
50-284 P
90-329 H
30-277 R
AUTHOR
ACCESS I OH
NUMBER
SUBJECT
CATEGORY
AUCEflSON, G,E
ALEX IS, C P
ALOERr D. M
ALLANrJ M
ALLEN, J
8007170559
80D7O1018&*
80071*0331
0007290409*
B007O7O079*
30-833
40~67S9
90-1S6
9O-S93
s&-2ao
ALLEN, J
ALLEN, J
ALLEN, B 0
ALLEN. R B
ALLMENDINOER.P
B007070079"
9007300412
80073906-17
8007090201*
8007030334
so~aao
50-290
30-278
TOPREP
PR
AHBERO'P J
AND ALMA (4, E
ANDEFta.U A
ANDERSON, T M
AND-EHSDN, T M
800710026B*
QOD7OB0009
0007140133-
00071 40340"
B007 100353
BO-BOA
fft
SECY
ACRS
TOPflEP
ANDERSON, J L
ANDERSON, T M
ANDERSON, T M
ANDERSON. T M
ANDERSON, T M
8007230*23
B007 140379*
BQ07140<I1&»
B0071S0696*
B0071607A9*
jiuueo
TOPREP
TOPREP
TdPHEP
TOPREP
ANDERSON, T H
ANDERSON, D 0
ANDERSON, T H
ANDERSON T M
ANDCRBON, T M
B007 1 40373B
5007290321-.
B007O1000S
BOO 7 1403 67
8007140407
TOPREP
OA991?
PR
TOPflEP
TOPREP
ANDERSON, T H
ANDERSON, T M
ANDERSON, T. H
AKDERBQM. T H
ANDERSON, D T
B007130i4i
0007140743
B007170230
80070S0371
80O7I0026B*
TOPREP
TOPRCP
30-H93
50-339
50-206
ANDERSON* T H
ANDERSON, T H
ANDERSON, T M
ANDERSON. C,J
AUDEHBOM.T M
B007020441
0007020 64 4 »
8007020590
B007230&21
8007B10410
TOPREP
TOPHEP
TOPREP
90-397
TQPflEP
ANDERSON, N R
ANDEftBQN.C
ANDERSQN.C,
ANDDGNINIjQ C
ANDOOMINI.ft, C,
Q007300099
B0072B017B
BC-0731023I
BC-07230196*
BC-072B02SB*
30-339
30-322
NUflEO
30-293
30-293
AMDOQNINI,« C,
ANDO<3HINI,0 C
ANDDONINI,& C
ANDQ-ONINI.O C
ANDOOMINI.C 0
B00714O41B
3007310006
0007210301
8007030142
B0071S0337
30-293
30-293
BO-293
30-293
30-293
ANDOONINI,0 C
ANDOQNIMI.Q C.
ANDREWS, M 0
ANDREWS, I
ANDREWS, J, (•
B007B 30309
800729099*
0007090283*
Q007020217*
B0071S0230
30-293
30-293 ;
TOPREP •
30-334
REOOD
ANO. W P.
ANKLAM, T 11
ANTOUN.R L
APPELHAN9, A D-
APPLEVftRD.M M
B0071tOB7S»
B007300373
S007O9020U
6007310393
300519063*
90-41&
NUREO !
TOPSEP r
HUREO '
SO -320
423
124
PERSONAL AUTHOR INDEX
AUFHOR
ACCESSION
NUMBER
SUBJECT
CATEQQBY
ARAOON, R
WltijI.Q A
ARCHITZEL,R
ARLOTTO.O A
ARNOLD. R C
SO 073 100 04
80 07220 3B3»
8007210247*
8006270332
B0071 10030*
NUREQ
30-302 P
50-317 Q
PR
50-287 J
ARNOLD, R,C
ARNOLD, R €
ARNOLD, R,C
ARNOLD, R €
ARSENAULT.F J
8007070287
0007170454
8007220485
8007310439
6007250018
50-320 P
50-320 P
50-320 0
50-32,0 P
MISC
ABH.R F
ABHEHDEN.MI C
ABPEROEfl.R 0
ASWELL. D L
ASHELL. D L
BC-0709O339*
B007180011*
B007QBOOQ8
C 0-07 1004 29
6007180417
50-317 Q
50-327 0
SO- 4 52 0
50-302 Q
50-3 B2 a
ABHELL, D L
ABHELL, D L
ASHELL, D L
ABNELL, D L
ABHELL, D I.
B 007290 4 39*
G00701O341
8007010319
8007020397
8007100163
50-3 BE 0
30-3 BE F
50-382 S
30-3 B2 8
50-3 BS K
ABHELL, D L
ASWELL, D.L
ASHELL, D.I.
ASWELL, D L
ASWELL, D L
H00710O164*
8007300399*
80 07060 179
8007090234
8007220373
SO-3B2 K.
50-332 0
50-392 A
50-392 3
90-333 F
ASHELL, D L
ATKINSONS P
AU-YAM8,M K
AUBTIN, M A
AUSTIN, M, A
B007250399
8007220973*
8007090201*
8007 150 1 4S*
80 071 BOS 09
30-332 F
50-414 A
IOPREP
70-344
70-344
AUBTIM, M. A
AUSTIN. M A
AUBTIN, J.H
AUBTIM, M A
AUTIO, H A
B007020O05*
8007130135*
BO 07020 5 66
8-007280311
80 070702 B4
70-135
70-364
30-437 A
71-9022
30-29 fl
AUTld. H A
AVIS, A B.
AXELRAD.M
AXELRAD. H
AXELRAD. M
8007210002
8007EB027I
80070301 1 9
B007020604
B007020604
50-29 0
27-49
PR
50-376 0
50-376 0
•vKELRAD. M
AXELRAD.H
AKELRAD. H
AXELSON.U L
AVER,J E
B007100160
6007530333
6007230333
B007290406
8007090186*
PR
30-376 0
30-376 0
50- 1 55 F
70-1-257
«,YER, J, E
AYER.J E
AVERS, P. J
AYRES, S. T
BAC1.P E
B007210315*
B007090193
8007230332
B00710017S
B007280137*
70-1257
70-1257
30- 1Q D
30-272 6
30-4 9 B Q
B ADR AH, S
BAEfl.T B
BAEfl.T S
BAOAOLIO-M
BAQDEM, 0.
B0070IOS51*
6007240135
B007220SOB
8007310327*
B007140049
30-237 B
71 -A 679
27-46
30-27S 0
PR
BAODEH, 0
BAILEY, R.
BAIR.O 0.
BAISDEN.L,
BAISDEN. L
H006240031
B007230138
B00714031S*
80072 10363
8007310006
40-1162
90-3BO 8
30-344 R
CONTRACT
CONTRACT
BAKER, T,
BAUER, K R
BAKER, K R,
BAKER, B.
BAKER, B.
8007110443"
8007010393*
6007110493*
8007090290
80070902.98-
HUREO
50-258 a
30-155 0
50-446 0
30-466 0
BAKER, B. L
BAKER, B L
BAKER, B
BALAL[B,C 0
BAU.ARD.B L
8007170159
8007170171*
HOQ72306Q3
8007290473
8007070033*
90-466 0
30-466 D
90-466 0
XPORTLIC
30-514 D
BALLARDilt L
BALLENTINE, J M.
BALLINOER.P L
BALLINOER,P L
BALOUOH. R C
8007300033
B00722D338
80070B0393*
8007230423*
B0072I0398
30-28? 0
50-327 R
90-898 R
30-299 R
30-445 11
BANA3ZAK,L, J
BANABIAK.l. J
6ANA8, E H
BARDES, C R
BAR DCS, C, R
B007160B40
8007180368
8007090131
B007II0107*
B0071I01S5*
90-10 D
30-10 D
40-8021
30-3SO J
30-32O J
SARDES, C R
BARDES. C-fl
BARDES, C. R
SARDES, C,R
BAR&Efl, C R
B007U012Bi>
B007I10132*
80071101391)
B00711014D*
80071101431
50-320- 0
5Q-32O J
90-320 J
50-32Q J
30-330 J
AUfHOJi
ACCESSION
NUMBER
SUBJECT
CATEGORY
HARDES.C R
BARGES, C R
BARDES.C R
BARDES.C R
UAROES.C R
B00711Ot47»
0007110151*
8007J 10156*
8007110160*
e0071iat67*
30-320 J
30-320 J
30-320 J
50-330 J
30-320 J
BARDES.C R
BARDEB,C R
BARDES.C f)
BARDES.C R
BARDES.C K
6007110176*
60071 10I7B*
B007110201*
B0071 I020B*
GOQ7J 10212*
80-320 J
90-320 J
80-32O J
SO-32O J
SO-32O J
BARDEB. C R
BARJ.fi A
BARI.R A
BARI.fi A
BARKER. J L
8007110217*
BOO7210010
8 007240294
8007020344
80070700SO*
SO-32O J
RES
RES
fiES
50-10 Q
BARKER, J L
BARKER, D Q
BARLEY, S R
BARNEB, I
BARNES, I
8007230388*
8007300379
8007180110*
H0073i0195*
8007290504*
30-tO 0
50-498 A
30-320 H
OA999
OA999
BARNEB, I
BARNES, I
BARNEICH.J A
BARNES, J H
BARNTHDU8E, L M
BOO72S0109*
BOO7160146*
fl 0070 10364*
8007310237
8007210499
OA999
OA999
30-361 A
FOIA
50-247 P
BAROCH.C J
BARRETT. P A
BARRY, L H
BARTH, C A
BARTH, C A
B007I60397*
8007230066*
B0072SOI76
BOD7030243
8007090311
QA999
30-341 Q
BECY
30-469 0
30-498 0
EARTH, C A.
ffARTLETT.H T
BARTLETT.J 11
BAHTLETT.J
BASTMAN, V
8007350698
BOD7O2O746
B0071001BS*
BOO72B0540
B00724037B"
5D-2B2 0
PR
PR
30-220 H
SO-2B9 H
BARTNQFF, S
BARTRAM, B M
BARTRAK, D V
BASKIN.K P
BABKIN.K P
8007070113
8007220111*
B007ZZOO36*
8007230011
80O725036I
30-219 P
WASTE MOT
HABTE MOT
30-361 Q
30-361 0
BASKIN, K P
BABKIN.K P
BASKIN.K P
BABKIN.K P
BASKIN.K P
80O71 10401
8007100386
8007300303
80O72S033S
80O7310I62
30-206 P
REOOD
30-361 0
50-206 Q
90-206 0
BASKIN, K P
BASKIN.K P
BASKtH.K P
BASKIN, K P
BA9KIN.K P
00-07290489
BO07010465
8007010216
BO 07O 10479
B00701O353
50-361 Q
90-206 P
80-206 R
30-361 A
80-361 A
BASKIN, K P
BASKIN, K P.
BABKIN,K P
BA9KIN, K P
BASKIN.K P
BO 07080091
BO 0731 OHO 1
B0070BO271
B007I5O579
B0072 10463
50-361 A
50-361 Q
50-206 F
50-206 P
80-361 A
BASKIN, R P
BATEHAM, U H
BATEMAN, W H
BATE6,J U
BATES, J, U
B007B90620
8007170692*
B00717O274*
6007100391*
80 071 OM 1 0*
30-361 A
80-354 0
80-334 0
70-1131
70-1201
BATES, J U
BATES, B J
BATES, A
BATES, A
BATES, E F
6007140073*
B0072B0037*
8007030351
6007 140691
BO 072904 78»
70-143
QA999
PR
PR
90-128 H
BATES, A K
BATES, J M
BATES, J. 0
BATTLE, R E
BAUCUB, H
6007090347
B097180316*
B007230507
8007140610
80072S0067*
30-327 P
70-143
30-329 A
NUREO
90-3HO H
BAUER, R H
BAUER, E R
BAUM,E A
BAUM,E A
BAUM,E A
9007240094*
8007280453*
8007030 194
8007070201
9007180569
71-5607
90-317 9
30-280 F
30-339 P
30-339 P
BAUM, E, A
BAUM.E A
BAUM,E A
BAUM.E A
BAUMANN, R 0
9007220579
8007340049
9007260432
B0072S03B3
9007300561*
90-338 F
30-339 A
90-338 F
50-333 F
CONTRACT
BAUM, P M
BAUMACK, U
BAUMACK, U.
BAUNACK. W
BAXLEY.S X
B007150573»
B007SS0263*
B007210255*
B007290OIO
B00701091B*
90-133 R
80-220 0
50-333 0.
50-22O S
80-346 S
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
BAXLEV, 8 X
S00703027B*
50-321
S
BAXLEV, 3 X
8007110442-
90-321
S
BAXLEV, S X
B0072 10492*
50-321
S
BAXTER, T A
8007070310
30-484
0
BAXTER, T A
8007070315"
50-494
0
BAXTER. T A
8007070315*
50-4B4
0
BAXTER. T A
60071 5052.7
50-312
0
BAXTER, T A
B007150S56*
50-312
0
BAXTER, T A
60071 50556*
30-312
0
BAXTER, T A
B00725034S
50-312
P
BAXTER, T A
B00725040B
50-4B4
0
BAXTER, T A
8007250408
50-484
0
BAYNARD, P Y
8007100101
REGGD
BAYNARD, P Y
B0070203S7
50-302
P
BAYNAflD, P V
B007230193
Pfi
BAYNAFID. P Y
B0071 10122
50-302
P
BAYNARD, P Y
BO0715O7OB
50-302
R
BAYNARD, P Y
80072 1 0203
30-302
P
BAYNARD, P Y
8007180294
50-302
P
BAVNARD, P Y
8007 1803 I 3
50-302
P
3AYNARD, P Y,
90071803S4
50-302
P
BAYNARD, P Y
8007230562
30-303
0
BAYNARD, P Y
S007220333
30-302
P
BAYNARD, P Y
8007240074
50-302
P
BAYNARD, P Y
8007250326
50-302
P
BAYNARD, P Y
Q007280127
30-302
P
BAYNARD, P Y
9007280373
30-303
F
BAYNE, J P
8007170314
50-286
Q
BAYNE, J P
8007030S54
50-286
F
BAYNE, J P
9007070212
50-333
F
BAYNE, J P
9007180597
30-286
0
BAYNE, J P
6007140347
50-284
0
BAYNE, J P
9007280471
30-220
0
BAYNE, J P
8007090303
50-296
V
BAYNE, J P
900708033S
30-333
P
BAYNE, J P
80070B0367
50-286
P
BAYNE, J P
900729072B
50-296
P
BAYNE, J P
8007280461
80-286
1
BAYNE, J P
B007290SBO
50-286
P
BAVNE, J P
BQ07S907S3
SO-286
F
QAYNE, J P
B007290692
50-333
P
BEACH, A B
B007110076»
80-382
Q
BEAN, R M
8007310310
NUREO
BECHHQEFER, C
8007090209
90-339
0
DECKHQEFEfl, C
B007140012
80-409
0
BECHHOEFER, C
BOQ71305QS
50-409
Q
BECK, M K
B0072S00731
40-B771
BECK, E J
8007280151
71-8979
BECKER, J M
8007 17O 176
XPORTLIC
DECKER, J H
9007230602
XPORTLIC
BECKMAN, D A
8007230174*
30-334
0
BECK3TED.H F
B007S90448
50-322
B
flEDNAH,L F
8007090368*
30-298
3
BEENV, S T
8007250495
50-399
H
DEENY, S T
9007850485
50-395
M
BEERS, F C
8007190400*
30-271
R
BEHAM, J L
8007180047*
80-322
H
BELANOER, J L
8007310267*
50-303
0
BELCHER, R L
800723049S
80-146
R
DELCRAIR, D P
9007290932
71-370
BELORAIR,D P
8007290934*
71-370
QELIM, A
9007020134
FOIA
BELIM, A
B0071402B9
FOIA
BELI3LE, 0 A
8007220088*
50-335
0
BELKE, W L
8007070101
50-2B6
P
BELL, J J
8007280265
50-289
0
BELL, J J
8007220033*
SO-SB9
H
BELMORE. C I
8007150712*
50-2 1 9
R
QENBERQER, D L
9007170577
50-460
8
BENDER, H
7905140021
30-439
0
BENNETT, H A
8QQ71SOQ49
NUREO
BENNETT, A B
9007250894*
OA999
DENNETT, H A
BOO 73 10241
NUREO
DENBtNO, D
S0071O01HO
PRM
DEROER,R F
80070204 1 3
80-836
0
BEROER.R F
9007310153
50-556
0
BEROER,R F
8007B20539
PR
BERICK, D,
8007030107
PR
DERKEBILErR D
8007100196
REOOD
DERMAN, M
9007110531
RE8
BEOHAN, H
800728009 1
REB
BERNERO, R tl
9007110487*
SECY
BERNSEN, S A
8007150116
PR
HER TELL. R,
9007020449
PR
DETANCOURT, B
8007020693*
30-291
H
PERSONAL AUTHOR INDEX
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
BETETA, P M
BETHUNE. E
BETTAUER,R J
BETTENHAU5EN, L
BEYEA, J
B007LB0169*
8O0711O449
8007170191
8007330221*
BO071 700B9
COMMISSION
50-313 H
XPORTLIC
50-293 Q
30-320 P
BIAL1K, E I
BICKHIT. L
BICKW1T, L
BICKWIT, L
BIDA.O
90071 10121
B007190S29
S007 1 1 0532
B0071401B2
9007210007
PR
COMMISSION
8ECV
30-247 P
RES
B I DOLE, C T
B I DOLE, C T
BIDDLE, C T
B10DLE, C T
HI DOLE, C T
B007020471
B007O20471
SO07O90013
8007080017*
9O070-80015*
50-466 O
50-466 0
50-466 0
50-466 0
50-466 G
BIDDLE. C T
BIDDLE. C T
BIDDLE, C T
B1ELAWSK1, A P
BIELAUSKI, A P
B0070B0017*
8D071B0432
B0071B0433
8007020462
8007020462
50-466 fr
50-466 0
50-466 G
50-599 G
50-599 0
BIELAUSKI, A P
BIEHMAN, s R
BIERMAN, S R
BIGIARELLI.K J
B1NGHAM, J
800723081 O
9007020016
8007310197
SO07100172*
8007200169
30-235 0
RES
RES
50-245 S
PRH
BIRCHELL, R C
BIRCHELL.R C
BIRGEL, 3 H
BtRKEL, R A
BIRKEL, R A
8007290639*
B007290S1B*
B007O30071*
80071 10519
80O7140466
30-327 S
50-327 S
CONTRACT
50-369 A
50-369 A
BIRKEL.R A
BIRKEL, R A
BIRKEL. R A
BIBCHOFF,C A
BISHOP, T U
8007O90091
9007170696-
8007280011
9007300106
8007230639*
50-369 A
50-369 A
50-369 A
50-528 C
50-397 0
BIBHQP.C J
BISHOP, C J
BISHOP.C J
B I SHOP J M
BISHOP.J M
9007090324
8007100023
B0071OO235
8007310116
6007310109
50-376 G
90-293 0
30-443 O
50-466 0
50-466 D
QIBHDP.L L
BISHOP,L L
BISHOP.C J
BISHOP.C J
BISHOP.C J
80071 10043
80071 I004B
9007100238
8007220092
9007220103*
PR
PR
30-320 O
30-273 O
50-275 &
BISHOP.C J
BIBHOP,C J
BISHOP.C J
BISHOP, T A
BIBSETT, P
8007220556
8007310160
9007310463
8007240394
8007180092*
50-445 H
50-344 &
30-309 O
UUftEQ
70-371
BISSETT, P H
OIVINS, H S
BLACK, R L
BLACK, R L
BLACK, R L
8007170630*
900723072 1 »
8007010330
9007080030
8O071O0043
70-135
40-B452
30-928 0
50-466 0
50-341 G
BLACKUELL, R M
BLACKWELL, R 11
BLACK, R L
BLACK. R L
BLACK, R L
8Q072S06BO*
BO07530692*
8O07 180246
8007180260
SO07 1S0426
50-321 R
50-321 R
50-498 G
50-466 G
30-466 G
BLACK, R U
BLACK, R L
BLACK, R L
BLACK, R L
BLAKE. E L
8007220013
SO072 40489
8G07E90748
8G073 10473
8007180394
50-49B G
SO-49B 0
50-498 G
SO-466 0
30-299 0
BLAKE, E L
BLAKE, E L
BLAKE, E L
BLAKE, E L
BLAKE, E L
8O07 180394
8007230321
BO073 30321
BC-073O0437
8007300437
50-2B9 0
50-299 G
50-2B9 0
50-289 0
30-2B9 G
BLAND, J B
BLOCK, J A
BLOEDEL, B A
BLQUfiH, A R
BLUME, M B
8O070 10289
BO07220334*
B007 180049
8007230736*
9007010247
SO-H5S P
TQPREP
NUREG
SO-277 a
50-445 M
BLUME, H B
BLUME. H B
BLUMMBER9, N
BODDY, J R
BODDY, J R
9007010264
B0072B0636*
8007020070*
8007230043*
8007220049*
50-445 M
50-445 M
90-277 Q
WASTE MOT
HASTE MOT
BODTKE, P J
BOELDT, E J,
B09DEM, 0
BDODEN, 0
BQHANAN, fi F
B0071 10414*
B00710017O
9007100091*
0007220314
8007300575
50-259 R
REGOD
40-1142
40-1162
NUREO
AUTHOR
ACCESSION
NUMBER
8U3JECT
CATEGORY
BdHN. M P
B0071S0059
RES
BONN, F! J
BOO 70 10470
50-367
A
BDH1J, M P
5007220065
RES
BQHtl.R J
8007210464
50-367
R
BOHM, R J
B0072B04B2
30-367
R
BOHN R J
B00711043S
50-367
R
BOLANDER.H A
8007280170
REB
BOLANDER.M A
80072S01B6
REB
BOLES, 0 S
6007290656*
50-327
B
BOLES, 0 S
8007 29069 1>
50-327
S
DONZOIJ, L L
0007310007
NUREO
BOOK, H E
B007140609»
27-48
BQOK.H E
S007300BB3«
90-254
a
BOOK, H E
8006110739*
27-10
BOOK. H E
8007310339*
SO-295
a
BOOK, H E
B007140657*
40-2940
BOOK, H E
B007140i63»
40-2 94O
HQOK.H E
B00717035i»
30-3 IB
a
BOOH.H E
80071406700
40-2940
BOOK, H E
Q007t90130«
50-344
a
BOOK, H E
B007110174
50-206
a
BOOK, H E
9007110184*
50-206
a
BOOK. H E
6007130124*
30-344
a
BOOK, H E
B007 180023
30-508
o
BOOK, H E
8007180025*
50-90B
a
BDOK, H E
8007230395*
50-224,
0
BOOK, H E
8007230330
50-224
0
BOOK, H E
8007160721*
40-79B2
BOOK. H E
8007230297*
30-206
Q
BQOK.H E
B007S40331*
70-12S7
BOOK, H E
600723029 1»
50-206
a
BOQX.H E
8007240322
70-1237
BOOK.H E
8007310163
50-268
a
BOOK.H E
8Q0731016B*
30-263
0
BOOX.H E
8007150106
90-344
0
BOOK, H E
8Q072302B2
30-206
0
BOOK H, E
8007100003*
30-320
a
BOQKE, B L
00072E0520
40-1162
BOOKE, B L
8007220330
40-1162
BORDENICK, B H
8007O70046*
30-514
D
BORDENICKi B 11
B007O8000 1
30-320
0
BORDENICK, B It
B007OBOOQ3*
30-32&
D
BORDENICK, B 11
8007OB0006+
50-320
0
BORDENICK, B 11
8007080059
50-322
C
BORDENICK, B 11
8007160601
50-322
&
BORDEN1CK, B H
B0071609B3
30-322
O
BORDENICK, B H
8007170201
30-514
O
BORDENICK, B M
B00734000B
30-322
H
BDRER,P, J
8007230392*
50-298
8
BDROHANN, E A
8007150106*
30-358
G
BORGMAMN.E A
B0070IOOB4
50-353
O
BOflOMANN.E A
6007080317
90-398
A
BQRQMA.NN,E A
B0072 10302+
50-338
a
BOROMANMrE A
8007210313
50-358
a
BORQHANN.E A
B007250616
50-338
0
BOROMANN.E A
8007080374
50-338
a
BQRGHANN.E A
800707025B
50-359
F
BOHGMAW. E A
8007E30376
50-338
a
BDROMAW, E A
8007290096
50-359
0
BDftOHANN. E A
9007140369
30-358
K
BOROMANN.E A
8007210424
90-359
K
BOH8MANN, E A
8007230-137
30-358
a
BOROOrO J
8007160366
50-369
s
BOROQ.O J
8007250297
PT21
BORNHOEFT, M H
8007280067*
PR
BOSCHUITI.H
80073 1052B*
50-2B2
H
BOUKNIOHT, J A
8007230796
50-3B9
M
BOURN I A, A
8007180296
50-438
A
BOUDEN,T J
8007110302
PRM
BOWDEN, D D
S007140617
NUREO
DDMERS-E S
9007020506
50-322
0
BOWERS, E 3
B007O20606
30-332
O
BDWERa.E B
B007O80204
50-322:
C
DQWER9,E S
BOOT 1 10346
SO-4S&
C
BOMERS.E &
B007310167
50-445
0
BOWERS, E B
6007230700
SO- 142
C
BOWNG, U D
8007160490
CONTRACT
BOYD. D C
8007070061 -*
50-232
0
BOYD, t> C
8007010393*
50-253
0
BOVD, D C
8007240210*
30-20?
Q
BOVER, V S
BOQ7S50471
50-352
A
BOZARTH, D P
8007230352*
50-460
A
BOZICH.T A
7910150137
40-4669
BOZICH, T A
8007030099
40-4649
BRADFORD,? A
8007O30213*
50-273
P
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEOORV
BRADFORD, W H
BRADFORD. f> A
BRADFORD, H H
BRADFORD , 0 P
BRADFORD, 0 P
8007070399*
9007 30029 1»
0007 24037 A«
0007S2O203
BOQ7.22O209"
50-34B N
90-23?
30-34fl f
30-269
50-269 i
BRADFORD, 0 P
BRADLEY. R T
BHADLEV.E J
BRADLEY. E J
BRADLEY. E J
0007320217*
B007H0617
OOQ71BO443
9007220591
80072BO3B4
50-287 '
NUREO
90-277
90-277
30-278
BRAMLETT.L 8
BRAMLETT, L 8
BRAMLETT. L 3
BRAMLETT.L B
BRAMLETT, L B
B0070 10480*
B007 150603 ••
BQ0715Q338*
80072 1O432*
BOO 7210413*
30-313 ,
30-313
30-313
30-313
SO-313
BRAMLETT. L 8
BHAMLETT.L B
BHANAOAN.E F
BRANCH, H H
BRANOENBUHO, B
B0071QO318*
80D728O911*
30071 OQ369
8007290929
8007220160
90-313
SO-313
NOAEO
71-36H
30-247 •:
BRANS. H E
BRANDEWBUJ10, B
BdAUN, J
BREAUK, D 0
BHEAUX, D 0
80072 3O5Q2*
8007290522
8007030038*
B007I4OO6B*
BQQ7140126*
90-399 i
90-247
FOTA
OA999
QA999
BRICKLEY. R H
BRICKl,EV-R,H
BRICKLEY-fi H
BRICKLEY.fi H
BRICKLEY.R, H
Q0071400BB*
B 00728 OOBB*
B007HO04B*
B00716Q171*
800729Q337*
QA999
QA999
QA999
QA999
Q.A999
BRICKLEYrfl H
BfttCKLEYrR 11
BRIDGES, A P
BRIOOB.L
BRIOOS.L
9037390321*
800731 0-3 16*
80O7160S13*
8004240213
6004340221
QA999
90-266 S
CONTRACT
50-310
50-217
BfttQHT.R H
BRIGHT, R M
BRIGHT. R H
BRIGHT. R H
BRIGHT, R M
6007030342
8007IB0340
6007010359
800707 O329
60O70BO29?
30-302 P
30-302 n
30-302 P
SO -302
SO -302 r
BRIGHT, R M
BRIGHT. R 11
BRINKLER, J E
BRINKLER, J E
BRIT1S, J B
6007IOQ193
6007190398
80070BQ417*
80O7210431*
6007100001
50-303
30-302 ft
30-309
30-309
PR
BROCKETT, T
BROCKET!, T
BROCKETT, T
BRaCKETT. T U
BRODER1CK.N E
8004240316
6007140330
6007230143
BOO 723 OMB
B00703020B*
1 1C
30-i!l9
HE
30-34
30-2B3
PROEHL, D J
BRQEHLrD J
DRQEHt-rD J
BROEHL.D J
BROEHL, D J
B 00703 0233
fl 007 10 034 5
8007100050*
B 00702 0394
BOO 7070273
30-344 «
PRH
30-341
30-344 »
30-344
BRQEHt.D J
BROEHL, D J
BROEHL, D J
BROEHL, D J
DRDEKL. D J,
60Q7UQ661
60071 BO 347
6007220970
6007290413
800729Q394
90-344 f
30-344
90-344
30-344 f
80-344
BRQQAN. 0 E
BROMBEHQ. B
BROOKS, T R
BROOKS, H
BROOK9, F M
80070 1Q364*
8007210-293
8007070 D8S
800714. 0637*
B 007 160239*
30-361
CONTnACT
Pll
TOPREP
CONTRACT
BKOHNAN, D F,
BROUNG, R J
BROHNC, U C
BROWN, R A
BROWN, 0 F
B00714O031*
0007230019
80061 1O739»
8007190471*
B00709OQ9E!
PR
tJUREO
27-10
50-2HO f
PR
DROWN, B L
BROUN, G
BROWN, E J
BROWN, 0 D,
BROUN, 0 D
•00072.10264*
Q 0071 40494*
B 006 12 0770
B 007 17 0297"
BOQ7170339*
QA999
90-263
080
•lo-a&os
40-BfiSl
BROUN, R,
BROWN, R
BROUN, 0, F
BROWN, 0 D,
BROUN, H H
9007220096*
B007S20064*
9007020633
8007170291
QQ0703004B
HA9TE MOT
WlWTE MOT
PR
40-0602 ,
BO-273 C
BROUN, H H
BHOHN,R A
BROUN, 0 D,
BROUN, Q D
BROWWi C i\
900703004B
9007230296
3007170337
3007830257 •
B0073 00309 «
flO~27S C
70-1177
40-06B1 '
50-313 i
90-263
426
PERSONAL AUTHOR INDEX
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEODJ1V
BROHHrO E>
B007230244
90-313
0
BRCHJN.O E>
B00729D231
40-9103
BROWN, Q 1}
BOQ729D244*
40-8102
BRQMN.S C
3007010363
50-404
A
SRQUN. S C
9007010413
50-338
Q
BROWN.R,
8007390308
NUR.GQ
BROUN. R
9007230205
NUREQ
BRQHN.C 0
8007130112
50-263
Q
EfiOHN.L J
800730.0340
50-133
0
BAOMN.M S
B00709 0392.
50-316
S
BflOWH.U J
8007 1 00246
PR
BRDWN.H 3
8007150703*
50-313
8
BROUN. S C
BOO? 1 9Q37 1
50-281
0
BflOWH, S C
BOD72 50363
5O-2B1
0
BRDMN.fi C
B0073 1 O42 1
30-aao
P
BROUN. H H
8007250429
50-273
0
BRUOOER, R M
B007O802&6
30-1B6
s
BRUOQER, R M
B007O8Q260
50-1B6
s
BRUNEFt.R a
B007230&01*
70-200O
DRUNNER, E J
8004240212
50-206
s
B RUNNER, E J
80042+021 S
50-318
s
BRUNNER, E J
300434022 1
50-219
8
DRUNNER, E J
B00424022B
50-293
8
BRUNNER, C J
B007020049*
50-277
Q
B RUMMER, E J
8007230730*
50-277
Q
BRUNHER.E J
BQ07E20O50
SO-Z19
Q
BRUNHERrE J
9007230202*
50-293
0
BRUNNER. E J
3007K30I57*
30-334
Q
DRUMMER, E J
B007 1 BOO77
50-293
Q
BRUNNER, E J
9007280236-*
5O-293
0
B RUNNER, E J
000731011B*
3O-372
Q
BAUNNER.E J
9O0702Q039
9O-277
Q
HftUHNER.e J.
9O0717O&B8
30-219
a
B RUNNER, E J.
8O072 1 Ol 57
5O-244
Q
BRt/NNER,E J
8O072 1 O24 1
30-317
a
BRUNNER, E J.
90072 3i0250»
50-230
a
DRUNNER, E J
S00721O231
3O-333
a
B RUNNER, E J.
900723O3B9
50-309
a
BRUNNER, E J
9007230130
50-209
Q
BRUNNER, E J
B00723O377
50-309
Q
BRUNNER ,e J
9007O2QS40
50-271
8
B RUNNER. E J.
9007D2OS36
5O-213
S
BRUNNER, E J
8007020145
SO-247
S
BRUNNER, E J
3007310499
5O-B47
0
BRUNNEfl,£ J.
SO073103&1
50-243
a
ERUNNER, E J.
9007180445
90-219
Q
E RUNNER, E J,
30071404,15
3O-334
s
B RUNNER, E J.
9007E3000S
53-244
a
S RUNNER, E J.
9007310052
50-272
0
BRUNNER, E J
900733D1B2
90-293
a
BRUfWER.E J.
9007:230140
50-334
0
BRUNNER, E J
9007330191
90-213
B
B RUNNER, E J.
90072 9O241
50-220
a
B RUNNER, E J
90073 IO104
30-S73
a
BHUNNER.E J
9007290248
30-393
Q
BflUNNER.E J
9007290010
50-230
S
BHUNNER.E J
8007390058
50-286
S
BflUNNER . E J
9007330197
30-219
8
BRUNNER. J E
8007390701
50-329
A
BRYAN, J K
9007190006*
90-483
0
BRYAN, J K
3007150010*
90-403
0
BRYAN, J K
90073 IO1 90
50-483
Q
BRYAN, J K
90071SOS34
50-483
F
BRYAN, J K
9007330336
50-483
S
BRYAN, R H
800731 0594
NUREQ
BUCHHOLZ.R H
B0071S0104
PR
BUCHHOLZ, R H
B007 140396
TOPHEP
BUCHHOLZ.R H
B007 140426
TOPREP
BUCHHOLZ.R 11
B007O90310
TOPREP
BUCHWQLZ,R.H
8007130724
TOPflEP
BUCHHOLZ.R. H
80073:20329
TOPHEP
BUCHHOLZ, R H
80072LO391
NUREO
BUCHHOLZ.R H
B007210366
TOPSEP
BUCKALEM. E4 H
B00731O007
NUREO
BUCKLE/, B.
B0070>20433
50-4&1
A
BUCKLEY, B. C
B007090343
50-275
A
BUCKLEY, B. C
B007230039
50-375
A
BUCKLE V, B.C.
8007230550
50-379
A
BUDNITZi R J
B007230727
50-320
H
BULI6CHECK, T S
8007220093
RE3
BULXSCHECK, T,
B007 190233
RES
BUMPya.B E
9007240476
NUREO
BUNKER, P. L.
BOO 722038 3*
50-303
P
BUNT I MO, J 0
B0071706B11
mac
BURACK, J-A
8007210320
70-157
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
BUflCHETTE. M H
EURO ESS. B L
B00721043S
800724021 0»
50-445
SO-3B2
M
0
EUROER, J F
30 071 0005 0»
PR
BURGER, F J
BURQIN,fl E
B0071B0400*
3007390024
50-371
70-2903
R
BUR I AN, R J
BURKE, T J
3007350110
3007020073*
71-3937
30-322
S
BURKHARDT, W
BURKS, N
9007090183
3007140674
70-1257
FOIA
BURNETT, R F
aOO722034B»
70-143
BURNETT, ft F
BURNETT, R F
8007090036*
B0070200BO
IOCFR
70-1201
BUSNETTE. 0 U
B007 150407
RES
BURNETT. R F
B007020476
70-572
BURNETT, R F
00071 10594
70- 1 43
BURNETT, R F
8007310433
7O-1201
BURNETT, R
00O72S0053*
FOIA
BURNETT, R
80D725Q05B*
FOIA
BURNS, S O
B007070126
50-255
0
BURNS, B O
B007310319
30-353
D
BURTON. R M
8007310133*
30-483
Q
BURUELL, S
8007020224
30-445
A
BUST I ON, R R
0007100030*
PR
BUTLER. M R
8007180177"
flEOOD
BUTLER. B D.
8007180011*
50-327
0
BYERLEY, T E
8007020342
PR
BVERLEY, T E
8007020533*
30-366
S
CADENA.D O
BOO707O174
PR
CAHILLjW J
80O 70 10081
30-3
Q
CAHILL-W J
B0070E0077
30-3
Q
CAHILL, M J
B0071702B7
50-3
Q
CAHILL.H J
BDQ71B0560
50-3
0
CAHILL, M J
BOO 7 180392
50-3
0
CAHILL, M J
0007090339
50-247
P
CAHILL, M J
8007090231
50-347
P
CAHILL, 14 J.
BOO7 170363
50-3
R
CAHN.A L
6007330012
PR
CAHN, A L
BO 073004 52
TDPREP
CAIN,C L
8007300595*
50-354
0
€AIN,C L
8007290344*1
40-B102
CAIN, J
80O721OI04
HASTE MO'
T
CALDUELLrR A
8007100223*
30-267
0
CALDKELL. R A
B007070161*
30-284
0
CALDWELL, E
6007060359
30-139
H
CALHOUN, J ft
BO 070 10302
50-337
S
CALHOUN, J R
GO 070 10439
50-327
S
CALHOUN, J R
80070 1053B
30-337
8
CALHOUN, J R
0007010370
30-296
8
CALHOUN, J. «
80-07010417
90-337
8
CALHOUN, J R
0007010499
90-337
8
CALHOUN, J fl
80070IOS35
80-337
B
CALHOUN. J R
G 0970 10534
90-337
B
CALHOUN, J. R
S 00701 0490
50-327
8
CALHOUN, J R
8007010513
90-327
8
CALHQUN, J. R
B0070B0283
30-327
8
CALHQUN. J. R
BOQ7080393
90-259
8
CALHDUN, J R
0007030301
90-239
B
CALHOUN, J R
00O70B0334
50-327
B
CALHOUN, J. fl
8Q070B0394
30-260
S
CALHOUN, J. R
6007060405
90-260
8
CALHOUN. J R
B007I1037B
90-327
S
CALHQUN, J. R
B0070902B1
30-327
8
CALHQUN, J, R
BO07080370
SO-260
8
CALHOUN, J R
0007090419
30-396
8
CALHQUN, J R
3DO70S0313
50-239
S
CALHQUN. J R
3007090400
50-327
S
CALKQUN'O fl
8007090003
30-339
B
CALHOUN, J ft
S00711037B
50-296
S
CALHOUN, J R
80O711038B
50-296
S
CALHQUN, J R
80071 5043S
30-327
S
CALHOUN, J R
8007190504
80-327
S
CALHOUN. J R
B007 190470
50-327
B
CALHOUN, J R
BO071505BO
90-337
8
CALHOUN. J R
3007180491
50-327
B
CALHOUN- J R
BOO7 130570
50-299
8
CALHOUN. J R
S007I60B19
30-327
8
CALHQUN, d R
8007210461
80-327
3
CALHQUN. 0 R
B007 100301
30-296
8
CALHOUN, J R,
B007320469
30-327
8
CALHQUN, J R
B007230470
50-359
S
CALHDUN- J R
8007250436
30-327
S
CALHDUN, J R
BOO7220568
30-027
S
CALHDUN. J R
8007230490
30-239
8
CALHOUN, J R
0007230323
30-259
8
CALHOUN, J R
8007250418
50-327
8
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
CALHOUN, J R
CALHDUN, J R
CALHQUN. J R
CALHQUIJ, J R
CALHQUN, J R
8007290646
8007290657
6007290790
8007290820
B007290B22
50-337
50-259
50-337
50-296
50-327
a
s
s
a
s
CALHQUN, J R
CALHDUN, J R
CALHQUN, J R
CALHQUN, J R
CALHOUN, J R
6007230411
6007290636
8007390665
8007290720
B007290B10
50-337
30-327
50-327
50-260
50-327
5
a
3
S
S
CALWdUN, J R
CALHQUN, J R
CALHCIUN. J R
CALHQUN- J R
CALHQUN, J H
8007290762
BOO 7390685
S007290695
8007270578
8007290649
90-327
50-337
50-296
50-327
50-327
s
s
s
s
s
CALHQUN, J R
CALHOUN, J R
CALHOUN, J Fl
CALHOUN, J R
CALLAHAN.L J
8007290662
8007290675
B00729070B
8007290737
B007320197*
50-327
50-327
50-327
90-259
50-313
s
8
5
S
0
CAMPBELL, H
CAMPBELL, M
C AMP BELL, M
CAMPBELL, R H
CAMPBELL,! E
B007 170306*
8007170314"
B007 170438"
80071 10003
B007G20996*
FOIA
FOIA
FQIA
70-2909
TOP REP
CANADY, K S
CANLQN, L E
CANNON, 8 H
CANTER, H L
CANTRELL.F B
80071400071
8007110536*
80071505220
B007240420*
8007240329*
30-369
50-424
50-327
50-312
50-513
0
a
p
0
0
CANTRELL.F S
CANTRELL.F 8
CANTRELL.F 8
CAPHTON, D L
CAPHTON, D L
B0071 50452*
8007290361*
8007300594*
6007220060"
8007230231*
50-566
50-433
50-518
50-219
50-293
0
0
0
fl
fl
CAPHTQN, D L
CAPLAN, R
CAPLAN, R
CAPLAN, R
CAPPER, W E
8007310131*
B0070B0046
8007080048
8007310128
8007020630
50-272
30-320
50-320
SO-277
71-331
0
0
C
0
CAPRA, R A
CAPRA, R A
CAPRA, L A
CAPRA, L A
CARACO, I R
8007030220
B007240208
B007300 188»
8007300 178*
8007140073*
TOPREP
30-269
OA999
QA999
QA999
9
CARBAUQH, E H
CARBON, M H
CARDILE, F P
CABEY, W, VJ
CARFAONO, 8 P
8007240009*
7904120321
B007 100369
B0070 10397
B007O70368
30-195
50-333
NUREO
50-271
50-33B
a
a
i
p
CARLSON, R T
CARLSON, R T
CARLSON, R T
CARLSON, R T
CARL80N.fi T
8007030066
8007210326*
8007170665*
8007010229*
8007020216
SO-3E2
50-352
50-33*
50-443
30-334
s
a
a
a
a
CARL8QN. R T
CARLSON. R T
CARLSON. R T
CARLSON, R, T
CARLSON, R T
BOQ7B10345*
8007170606
8007170593
800721 022 1*
8007030155
50-367
30-2S6
50-363
50-352
90-352
a
a
a
a
3
CARLSON. R T
CARLSON. R T
CARLSON, R T
CARLSON, R T
CARLSON, fl T
8007170637
8007010219
8007020111
B007 170269
8007170283
50-397
50-443
50-410
30-354
50-323
a
a
a
a
a
CARLSON, R T
CARLSON, R T
CARLSON., R T
CARLSONS T
CAflLSQN, R T
8007020004
8007170249
8007310201
00072 10308
B00722027B
90-410
50-387
50-410
50-354
50-317
a
a
a
a
a
CARLSON, R T
CARLSON, J D
CARLSON, R T
CARLSON, R T
CARLSON, R T
8007010182
8007170088*
8007170671
8007170610
B007170SB9
50-443
50-133
90-387
50-387
30-443
s
Q
5
8
S
CARLSON, R T
CABLBON.fi T
CARLSON -R T
CARLSON, R, T
CARLSON, R T
B0071B0592
S007300317
8007300326
8007230267
8007280242
30-410
30-384
50-219
90-293
SO-354
Q
0
0
a
0
CARLSON, R T
CARLSON, R T
CARLSON, R T
CARLSON1. R T
CAHL80ff.fi T
8007170654
8007280071
8007160863
B007210013
8007210015
50-384
90-333
30-323
50-443
50-352
0
0
0
A
8
PERSONAL AUTHOR INDEX
427
AU IXOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
CARLSON. R T
8007210049
50-463 S
CARLSON, R T
9007310061
50-277 0
CARLSON, R T
B0072100'15
50-3B7 3
CARLSON, R T
9007210231
90-482 6
CARLSON, R T
8007210276
50-354 Q
CARLSON, R T
8007210334
50-307 Q
CARLSON, R T
9007180534
50-412 8
CARLSON, R T
8007250519
50-443 H
CARLSON, R T
8007210033
50-322 0
CARLSON, R T
8007310457
50-423 B
CARLSON, R T
0007210528
50-311 0
CARLSON, R T
8007250297
50-352 B
CARLSON. R T
B0073I0206
50-352 0
CARLSON. R T
BOO/290249
50-482 8
CAHLSON.fi T
8007290860
50-412 S
CARLSON, R T
8007290965
50-387 S
CARLSON. R T
9007310281
50-352 B
CARLSON, R T
80073 102B9
90-354 S
CARLSON, R T
0007310397
50-482 S
CARLSON, R T
80072 10533
90-423 Q
CARMEL, P
9005090524*
PT9
CARMEAN, S »
9007000230
MISC
CARNEY, J J
8007290059
PR
CARPENTER, J M
8007310009
NUREO
CARPENTER, J M
9007280683
NUREO
CARR.S E
8007020009*
CONTRACT
CARROLL, D E
8007010606
90-10 O
CARROLL, D E
9007010607
ORO
CARROLL. J T
8007230570
50-219 B
CARTER. A R
B007300074*
COMMISSION
CARTER, K IJ
8007070278
50-299 C
CARTWRIQHT, J E
9007030613
50-556 0
CARTWRIOHT, U R
8007010353
50-339 S
CARTWRIQHT, U R
8007010375*
50-339 S
CARTWRIOHT, IJ R
8007010398
50-339 S
CARTWRIOHT, IJ R
8007030363
50-339 S
CARTWRIOHT. IJ R
8007030269
50-333 8
CARTWRIOHT. IJ R
8007O3027O
50-338 S
CARTWRIOHT. IJ R
8007030271*
50-333 B
CARTWRIQHT. W R
8OO7O30273
50-339 S
CARTWfilOHT. U R
8007030275*
50-33? S
CARTWRIQHT, W R
8007030281
50-339 S
CAHTWH10HT. U R
8007030283*
50-33? B
CARTWRIOHT, IJ R
8007030385
90-339 B
CARTWRIGHT. H R
8007030289*
50-339 B
CARTWRIOHT, W R
8007070358
50-339 8
CARTWRIOHT. W R
8007070363*
50-339 S
CARTWRIOHT, IJ R
8007070374
90-339 B
CARTWRIOHT. U R
B007070379*
90-339 B
CARTWRIQHT. IJ R
B007090296
SO-339 B
CARTWRIGHT, W R
8007090304*
50-339 S
CARTWRIOHT, IJ R
8007O9O308
50-339 8
CARTWRIOHT, W R
8007090312*
50-339 S
CARTWRIOHT, IJ R
9007090317
50-339 3
CARTWRIOHT, H R
8007090323*
50-339 S
CARTWRIOHT, W R
8007090335
50-339 8
CARTWRIOHT, W R
8007090342*
50-339 S
CARTWRIOHT, W R
8007090345
50-330 S
CARTWRIOHT, H R
8007090353*
50-339 8
CARTWRIOHT, H fi
0007070373
50-338 S
CARTWRIOHT, W R
8007070381*
50-330 S
CARTWRIOHT, W K
8007140209
50-339 8
CAHTWRIOHT, W R
8007140225*
50-339 S
CARTWRIQHT, tj R
0007150606
50-338 8
CARTWRIQHT.U R
0007150701*
50-330 S
CARTWRIOHT, W R
0007 1 50608
50-339 S
CAflTWfilQHT. IJ R
B007150B10
50-339 B
CARTWRIQHT.U R
8007150915*
80-339 S
CARTWRIOHT, IJ R
B007150317*
50-339 S
CARTWRIOHT, U R
B007 150767
50-33B a
CARTWRIOHT.U fi
B007 150777*
50-338 8
CARTWRIOHT, If R
8007320579
50-338 S
CARTWRIOHT, W R
8007220580*
50-338 a
CARTWRIOHT, W R
8007220907
50-338 8
CARTWRIOHT, W R
8007330512*
50-333 8
CARTWRIOHT, U R
0007220601
50-339 3
CAHTWRIOHT, W R
B00723061I*
50-339 S
CARTWRIOHT, H R
8007230493
50-333 S
CARTWRIQHT, U R
0007330497*
50-333 S
CARTWRIOHT, W R
800729083B
50-338 S
CARTWRIOHT.U R
8007290843*
50-338 S
CASE, E 0
8007140066*
90-330 Q
CASE, E O
0007140071*
50-320 0
CASE, E
0007110547
FOIA
CASHMELL,R J
8007310403
50-196 R
AUTHOR
ACCESSION
NUHDEH
SU9JECT
CATEGORY
CASHWELL. R J
CATTOH, I
CATION, I
CAULDHELL. F S
CAULDNELL, F S
B007310405*
0007220308
8007160240
9007020315
8007030695
50-156
50-3
50-142
PR
PR
R
0
F
CAVANAUQH, W
CAWVNAUGH, (J
CAVANAUQH. W
CECH.L M
CECH. L
B007 100366
8007090066
8007150489
BQ07I10'!23'>
B00711044B*
PRM
SO-36B
50-313
50-346
30-346
P
P
S
S
CEMBER. H
CERNE, A C
CEHNE, A C
CERNE, A C
CERNE. A C
B007 1404B3
8007010335*
6007210209*
8007180561*
BOO 72 10945*
REOGD
50-443
90-410
50-410
50-433
0
0
Q
Q
CHAFFEE. A
CHAMBERLArN W M
CHANANIA, F D
CHANANIA. F D
CHANANIA. F D
9007210107*
8007140052
B007090233
8007090248
80070902B2
50-334
PRU
90-393
50-399
50-393
Q
H
M
M
CHANANIA, F D
CHANANIA, F D
CHANANIA, F D
CHANDLER, L J
CHANDLER, L J
Q007150500
BOQ72B0630
B0072B0636*
B007030373
8007020074
50-445
90-445
90-445
50-320
30-330
M
M
H
H
0
CHANDLER, L J
CHANDLER, L J
CHANDLER, L J
CHANDLER, L J
CHANDLER, L J
8007010304
9007030006
8007140034*
90071-10006
BOO 7070 104
50-320
50-361
90-361
90-320
90-320
H
0
0
T
0
CHANDLER, L J
CHANDLER. L J
CHANDLER, L J
CHANDLER, L J
CHANDLER, L J
0007080061
B007090205
8007170357
9007140032
8007300271
90-330
50-361
30-330
50-361
50-320
D
0
0
0
p
CHANDLER, L J
CHANDLER, L J
CHANDLER, L J
CHANQ.C I
CHAP I H, D
B0073 10467
9007310470
8007310469
8007310225
8007140479
90-320
50-361
30-361
NUREQ
REOOD
0
Q
A
CHAPLIN, 8 D
CHAPLIN, S D
CHAI>LIN,8 D
CHAPLIN, S D
CHAPLIN, S D
80Q701043B*
9007160535*
90071 30319t
B007150514*
8007290BI7*
90-320
50-320
90-320
50-320
30-330
S
8
8
9
S
CHAPMAN, U D
CHAPMAN, L D
CHARNDFF. 0
CHARNDFF, 0
CHA3E. J W
80071 10148
8007290233
8007300381
8007300391
80072804B4*
RES
RES
90-266
50-266
30-259
0
&
Q
CHATTER TON, M
CHATTERTOM, M
CHAUDHARY.S K
CHECK, P 8
CHECK,?, a
8007210102
9007240204
8007210309*
8007010176*
8007010207*
50-338
90-339
90-334
FOIA
FOIA
P
P
Q
CHECK, P B
CHEN, J C
CHEN, J C
CHERN.H S
CHERN.W B
BOO? 170656*
8007170460
BOO? 1 40642
BOO? 180354
B007310346
30-270
RES
RES
RCB
NUREO
P
CHESTER. R 0
CHESTER, R 0
CHE AND, R T
CHIANOI.N J
CHIANQI.N J
8007020356
8007140044
9007010217
80070B0249
8007160377
RE9
RES
NUREO
90-400
50-400
B
S
CHIANG I, H J
CHILDERS. B
CHILDB, W V
CHILDS.W V
CHILDB.H V
8007230247
0007Q904QQ
8007010495*
0007010519*
8007140374*
50-400
REOOD
50-333
50-333
50-333
S
S
5
S
CHILDS, W V
CHILDB, W V
CHILDS, W V
CHILDS. W V
CHILDS, W V
80071 40394»
00071 507 15»
0007380524*
BQ072B0617*
B0072G0667*
50-333
50-333
30-333
30-333
30-333
S
8
8
8
S
CHILES, L J
CHILK, B J
CHILK, a J
CHILK.S J
CHILK.8 J
0007110314*
BOO? 140! 22*
B007140I30"
B007220146*
B007 140291*
50-335
BECY
SECY
50-4B2
FOIA
K
0
CHILK.S J
CHILK.9 J
CHILK.S J
CHILK, g J
CHILK.S J
8007090114*
8007230234*
8007010309
80072800B4*
8007230135
COMMISSION
FOIA
REOOD
ORO
ACRS
AUTHDfl
ACCESSION
NUMBER
SUBJECT
CATEOORY
CHILK, 3 J
6007330134
ACRS
CHILK, 8 J
8007020661
PR
CHILK.S J
80O7O2O663
PR
CHILK, 8 J
BOO7020664
PR
CHILK. B J
BOO 7020663
PH
CHILK.S J
9007210331"
CONTRACT
CHILK.S J
0007020647"
70-H3
CHILK, B J
S007030660*
70-143
CHILK.S J
Q007O2O602
50-443
0
CHILK, B J
a007O3O629
30-371
0
CHILK, S J
B007020656*
7O-143
CHILK, S J
6007020597
30-395
M
CHILK, S J
B007 100036*
30-29*
0
CHILK.S J
S007090297
SQ-45H
0
CHILK.S J
BD0717O282
10CFF1
CHILK.S J
80072 9O7 58
5O-4tB
0
CHILK.S J
0007300369
SO-3KO
H
CHILK, 8 J
BOO73 00394
5O-271
H
CHILK.S J
0007300359
4O-1162
CHILK.S J
0007310462
BO-409
0
CHIL80N.V T
B00734O177*
9O-390
R
CHOKSHI.N
BQ071 00140
90-339
P
CHQNO. L R
QD0721O4B1
3O-320
H
CHQULEB, N C
8007230329*
SO-303
a
CHDW, E T
0007110049*
30-263
a
CHOW, E T
e00734O01B»
30-301
a
CKRI8TIANSOUiW
GOO? 10 029 14
90-331
Q
CHRISTENBUHV, E
SOOM20011
30-261
I
CHRIBTOFFER.O
0007020211*
SO-293
a
CHRISTENDURY.E
0007010138
30-277
i
CHRlSTOFFEft. 0
BOO724Q107*
30-2i3
a
CHft ISTENSEH, S
0007250413
30-344
a
CHURCH. J U
60071 30592"
90-327
p
CHURCHILL, B (J
0007330803
30-30a
0
CHURCHILL, B (J
8007230002
30-002
o
CIESZ1EWICZ.8
80071B0336*
30- 1O
R
CIPOLLA, R C
90 07280 404*
90-S06
8
CLARDY.L
80 071 0039 1«
30-331
a
CLARITV.H K
80072S04B9
90-363
p
CLARK, A T
80070S0417
SO-26H
p
CLARK, A T
B007 130057
70-1308
CLARK, F H
B0071406IO
NUREO
CLARK, R A
B007030194
90-2B3
p
CLARK, R A
800702O233
90-2B2
K
CLARK, R A
80071 80 S3B«
30-344
Q
CLARK.R A
B007100I32
50-333
p
CLARK, R A
8007100136*
30-333
e
CLARK, R A
B007100141*
30-335
p
CLARK.R A
800702029B
30-344
p
CLARK, R A
8007030362
30-334
p
CLARK, C
B007100KB9*
30-392
H
CLARK.R A
00071OOO7Q
30-333
p
CLARK.R A
8007140363
30-344
p
CLARK.R A
BOO 7 1*0372"
30-344
p
CLAtlK, R A
B0071S0379*
30-344
p
CLARK.R A
BOO 7 170172
30-344
p
CLARK.R A
B00717OSDQ
30-36!,
p
CLARK.R A
B0072101B3
30-344
p
CLARK, R A
B007 100034*
30-344
o
CLAfiK.R A
B0071B04B2
30-344
0
CLARK, A T
8007280035
70-1308
CLARK, H A
80071BO441
30-344
p
CLARK.R, A
8007IB044B*
90-344
p
CLARK.R A
8007 1804 94»
90-344
p
CLAY, F, L
a007I50049»
70-1113
CLAY.E L
8007140B27"
70-143
CLAYTON, D M.
8007230396"
90-397
A
CLAYTON. F L
80070 t 0424
50-34*
A
CLAYTON, F L
B007010444
30-34 B
B
CLAVTQN.F L
B0070104B9
50-364
A
CLAYTON, F L
Q007150714
SO-34B
P
CLAYTON, F L
B00701Q406
50-343
B
CLAYTON, F L
0007070292
30-364-
A
CLAYTON, F L
B007070J48
90-349
K
CLAYTON, F, L
B0070B0222
30-364
A
CLAYTON, F L
B007090237
50-364
A
CLAYTON, F L
B007100I03
90-364
A
CLAYTON, F L
BOO? 3 L 0269
30-348
0
CLAYTON, F L
B007090214
NUffEO
CLAYTON, F, L.
B007100177
90-364
A
CLAYTON, F, L
8007140343
30-364
A
CLAYTON. F L
8007160349
50-343
a
CLAYTON, F, L-
8007160879
30-364
A
CLAYTON, F L
8007290839
50-34 Q
a
CLAYTON, F L
8007100261
&0-340I
K
428
PERSONAL AUTHOR INDEX
AUTHQFI
ACCESSION
NUMBER
SUBJECT
CATEGORY
CLAYTON, F L
CLAYTON, F L
CLAYTON, F L
CLAVTDN, F L
CLAYTON, F L
8007 150662
80075104'39
0007220510
8007220558
9007250320
50-3*8 R
50-348 P
50-348 P
50-3.19 P
50-364 A
CLAYTON. F L
CLAYTON, F L
CLAYTON, F L
CLAYTON, F L
CLAYTON, F L
SQ072204B6
B007230554
B007S20410
8007220581
B007230-103
50-364 A
50-349 P
50-364 A
50-364 A
50-348 P
CLAYTON, F L
CLAYTON, F L
CLAYTON, F L
CLAYTON, F L
CLAYTON, F L
B007230485
8007230^92
9007230510
8007230546
8007230553
50-364 A
50-364 A
50-364 Q
50-364 A
50-348 P
CLAYTON, F L
CLAYTON. F L
CLAYTON, F L
CLAYTON, F L
CLAYTON, F L
8007230567
8007230592
900724007!
8007310150
3007380557
30-364 A
90-364 A
50-364 A
50-364 0
50-364 A
CLAYTON. F L
CLAYTON, F L
CLAYTON, F L
CLAYTON, F L
CLAY TON, F L
B007250479
8QD72B0641
B0072BO-190
0007290637
BOO 7290642
50-348 Q
50-348 F
50-364 A
50-364 A
50-364 A
CLAYTON. F L
CLEttENr.C
CLEMENT, C
CLEHONS, P
CLEVELAND. C J
B007310330
BOO 70 104 50*
B007070372*
B0072 10304*
E00722003S
50-364 Q
50-336 8
50-336 S
70-687
50-263 P
CLOSBURN, T
CLUCAB, J A
CLUSEM, R C
COCHKAN, T B
COCHRAN. T B
BQQ7210400*
BOO 70 104 57
8007300234
8007110006
B00714049B
50-368 B
30-279 H
PR
70-143
FOIA
COCHRAN, R 0
COCHRAN, R 0
COCHRAN, R 0
COFFEY, 11 E
CDFFMAN.F D
8007210302
8007210312*
800724003B
QOQ7220101"
8007010093*
30-99 R
30-59 R
50-59 R
HASTE HOT
FOIA
COFFMAN, F 0
COFFHAN. F D
COFFMAN, F D
CQFFMAN. F D
CDFFMAN.F D
8007010103*
8Q07010114B
B0070I0126*
9007010158*
8006120855
FQ1A
FOIA
FOIA
FOIA
OEH TEC IB
COOOIH.C L
COGQIN, C L
COOOIN, C L
COQQIN, C L
CDQOIN. C L
80O7030286*
8007030642*
8007110437*
8007110313*
8007 150642"
30-321 S
50-321 S
50-366 S
50-321 S
50-366 B
CQGOIN, C L
COGS IN, C L
CQGOIM, C L
COGG I M, C L
CQOQIN, C L
90072B0455*
8007170419*
8007210397*
800721 037 1«
80073H0319*
50-366 B
30-321 S
50-366 B
50-321 B
50-321 B
COGQIN, C L
COHEN, 0 L
COHEN, I
COHEN, I
COHEN, B
0007300513*
8006300112*
8007SB0746*
800723049'!*
8007070097"
50-321 B
ACRS
70-1100
70-H20
CONTRACT
COHEN, J C
CQHN, B M
COLBERT, M F
COLEMflN.R
CQLEMAN, R
Q007 1902 17ft
8007150119
6007 160687
BOO? 170 167
8007240168
State Prog
PR
90-341 A
CONTRACT
CONTRACT
COLEMAN.R
CGLEMAN.R
COLEMAN,R
COLLINS, P
COLLINS, R E
B007250556
S0072B071H
9007170217
0007020731*
8007150091*
CONTRACT
CONTRACT
CONTRACT
CONTRACT
50-267 Q
COLLIER. R E
COLLINS, P F
COLLINS, J H
COLLINS, J T
COLLINS, F H
8007140096
6007020319
B0071B042B
B007020I83
6007210331*
PR
90-254 V
90-400 V
50-320 R
CONTRACT
COLLINS, J T
COLLUHS.J T
COLLINS, J T
COLLW3, J T
COLLEH9, J T
8007100)03
B007110293
8007290207
B007250223
B00723020I
50-030 P
50-320 P
5D-3SO B
50-289 B
30-320 S
COLLENS.F M
COLLINS, J T
CQLLGNS, J T
CDLLINS.J T
COLLINS, J T
0007140203*
6007 150053
8007180102
6007850211
8007250231
CONTRACT
50-3PO R
30-320 R
30-320 S
50-320 8
AUTHQfi
ACCESSION
NUMBER
SUBJECT
CATEGORY
f
COLLINS, J T
B007230237
90-320
B
COLLINS. J T
B007 170547
50-320
B
COLLINS. J T
B0071 70462
50-320
R
CDLLINB, J T
B007 170540
50-320
B
COLLINS, J T
0007180539
90-320
R
COLLINS. J T
3007230643
50-320
P
COLLINS, J T
0007170593
50-320
B
COLLINS, J T
B007 170564
50-320
S
COLLINS, J T
0007170997
90-320
3
COLLINS, J T
8007240303
30-320
S
COLLINS. M
B0071 30694
50-368
B
COLLINS, H
0007190702
50-298
B
COLLINS, M
0007150690
50-267
B
COLLINS.J T
9007230719
SO-320
R
COLLINS, J T
B007250713
30-320
F
COLLINS, J T
B007240I1B
30-320
B
COLLINS, J T
B007230210
30-320
B
COLLINS, R C
0QQ72B0023
50-320
P
COLLINS,? F
B007290055
I1IBC
COLLINS, J T
6007310337
50-320
P
COLLINS, H
8007220399
90-295
B
COLLINS, H
0007220400
50-295
B
COLLINS, H
8007220401
30-295
B
COLLINS, N
8007220402
30-295
S
COLLINS, M
8007220404
50-295
B
COLLIN3,M
B007220405
50-295
S
COLLINS,M
B007220406
50-304
B
COLLINS, M
8007220400
50-304
B
CGLLINS, M
B0072B0409
30-304
3
COLLINS, M
60072204 1 1
30-304
S
COLLINS. M
BOO 72204 12
50-304
B
CGLLINS, H
B007220413
30-304
S
COLLINS, M
8007220414
90-304
B
COLLINS, J T
9007310136
50-289
R
COLLINS, M
8007230339
50-237
S
CQLUHS.M
0007230343
90-295
B
COLLINS, H
8007230347
90-299
B
COLLINS, M,
8007230391
50-295
B
COLL INS, M
8007230352
50-295
B
COLLINS, H
8007230337
50-299
8
COLLINS, M
B007230359
90-249
8
COLLINS, M
B007230397
50-263
9
COLLINS, J T
B0073 10336
90-320
P
COLLINS. J T
B00731045B
90-320
P
COLLIER, R P
8007240394
NUREO
COLOMBO, P
8007310216
NUREO
COLOMBO, R H
3007080277"
30-312
a
COLOMBO. R W
8007190592*
50-312
R
COLOMBO, R W
9007310410*
30-312
B
COLT, 0
0007230630*
90-330
H
CDLTON, E
9007020379
XPORTLIC
COMPTON, R M
B007160745*
90-339
Q
CONDIE.K 0
8007210017
REB
CONCEL, F J
B007030373
NUREO
CONGEL.F J
0007100369
NUREO
CQNOELiF J
90Q7170359*
50-320
0
CONLON.T E
0007100413*
90-324
a
CONLONiT E
0007100435*
90-400
Q
CONLtlNrT, E
0007070169*
50-389
a
CONLON.T E
8007100234*
30-353
0
CQNLONiT E
B00710015U
90-269
Q
CONLON, T E
8007130021*
50-269
Q
CONLQNiT E
B0071B0275*
50-395
Q
CONLON.T E
B007290414*
90-424
Q
CQNNERS.E L
8007140027
50-336
P
CONNELLY, D 0
B007200587*
QA9<J9
CONNER, T B
0007110333
PR
CONNER, T B
0007 1501 1 2
PR
CONNELL. C
8007210377*
90-2B6
R
CONNER- T 11
B0071 90030
27-39
CONNER, T D
8007310424
30-395
M
CDNNDLLEY.J L
8007070303ft
3D-2BS
S
CONRAD, E T
00070700SS*
CONTRACT
CONRAD, R E
8007010336
50-334
P
CONTEiR J
8007230207
90-320
B
CDNTEpR J
9007290201
50-330
B
CONTE.R J
0007230214
50-320
B
CONTE, R, J
8007290231
50-320
S
CONTE, R J,
9007290237
50-330
3
CONTE, R J
B007 170347
50-320
B
CONTEiR J
9007170940
50-320
B
CONTE.R J
9007170553
50-320
S
CONTE.R J
8007170D64
50-350
B
CONTE, R J
8007170397
30-320
8
CONTE.R J
B007240203
50-320
S
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEQORY
CONTE.R J
0007340118
30-320 B
CONTE.fi J
8007230219
50-320 B
CQNTI.P L
6007010001
SO-201 I
CONTRELL.F B
0007240329*
50-910 0
CONVERBANO, E
8007070418ft
CONTRACT
CONWAY, T U
8007220101ft
WASTE MOT
CONWAY, J
6007 170692*
90-219 Q
CONWAY, W F
8007230699
30-271 a
CQNWAY, T U
8007220036ft
UA3TE MOT
CONWAY, J T
B007010073
30-247 P
CONWAYiW F
80071 BO 549
90-271 0
CQNWAY, IJ F
9007100594
30-271 0
CONWAY, W F
80071B039B
50-271 R
COOK, R J
8006300139*
30-329 Q
CQDH. R J
80072304 12*
90-329 Q
COOK. J H
8007020226
PR
COOK. J 14
8007020649
30-329 a
COOH, J II
8007020306
50-329 Q
COOK, R J
8007300304*
50-329 Q
COOK, J U
800707O119
30-389 A
COOK, J U
0007200040
50-329 A
COOK, J W
0007310329*
50-329 Q
COOH. J M
8007140331*
50-299 R
coon, j u
S007 130497
30-329 A
COOK, J U
BQ07160612
50-329 0
COOK, J U
8007210493
50-329 A
COOK, J tJ
0007290206
90-329 8
COOK. J U
90072B0124
50-329 R
coouev, N J
0007240331*
70-1 2S7
COONEY, M J
8007070392
90-270 8
COONEY, M J
8007000216
SO-277 B
COQNEY. M J
8007180419
30-277 R
COONEY, H J
S00721037B
30-276 0
COOPER. W E
80073 103B6
30-329 A
COOPER, W E
80071 I04S3
NUREO
COOPER, L J
8007250501
50-299 8
COPELAND. R L
8007030179
PR
COPELAND, R L
8007010366
30-537 T
COPELAND, R L
8007100194
90-337 F
COPELAND. J 0
80070B009B
30-466 0
COPELAND, J 0,
8007090 1B9
30-466 0
COPELAND. J 0
8007000030
90-466 0
COPELAND. J 0
8007090 1 Qt
30-466 0
COPELAND, R L
B0070BQ264
30-337 D
COPELAND, J 0
8007160639
50-466 0
COPELAND. J 0
8007160639
90-466 0
COPELANO, J 0
8007300417
50-498 0
COPFLAND. J 0
8007230424
50-466 0
COPELAND. J 0
8007230424
30-466 0
COPELAND, J 0
8007290082
50-466 0
COPELAND, J 0
8007300413
50-466 0
COPELAHD, J 0
B007300449
SO-466 0
COPELAND, J 0
6007300413
30-466 0
COPELAND, J 0
6007300149
90-466 0
CQPELANO, J 0
800730040B
30-466 0
COPELAND, J 0
BQ07300439
30-466 0
COPELAND, J 0
0007310094
30-4A4 Q
COPE-LAND, J 0
B007310300
30-466 0
COPELAND, J 0
0007300402
30-466 0
COPELAND, J 0
8007300439
30-466 0
COPELAND, J 0
8007310094
30-466 <J
COPELAND, J 0
80073 1030B
50-466 0
CORHETT. J B
8007100461
71-9094
CORDETT, J 8
8007160417
71-9070
CORCORAN. T
8007290221
40-299
CORCORAN. T
8007020089*
50-1O U
CQRDANI.R A
8007010553
71-9341
CORDANI.R A
8007020339
70-27
COR DAN I, R A
8007020358ft
70-27
CORE, M
BOQ707Q383*
90-283 8
CORNELL, D A
B00709041Q
REOQD
CORREA, H A
6007010523
30-272 J
CORREA. M, A
8007310342
30-272 J
COHREA. M A
8007310376
30-272 J
CORRIOAN. J J
800729002B*
COMMISSION
CORWIN, J M
8007110121
PR
CORYELL, 0 P
S007020220*
70-1191
CORYELL, 0 P
9007290223*
70-27
C08TELLO, F
8007170349*
70-1069
C09TELLO, F
8007170438*
FOIA
COSTELLO, F
8007140631*
40-B702
CUTTLE, W T
8007170224*
30-327 Q
COUN8IL. H 0
8007300338*
90-213 P
COUNSIL, H Q
8009300283
PR
COUN31L, H 0
0007100Q3S
PR
PERSONAL AUTHOR INDEX
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEOORV
COUNBIL. W
COUNBIL, W
CdUMBIl., W
COUNBIL, H
COUNEIL, W
i
i
i
1 O O O O O
BQ07I00035
B00702OO39
BOQ702O472
Q007 170491
B00702O472
PR
30-336 Q
PR
50-313 Q
PR
COUNBIL, W
COUNBIL. W
COUN3IL, W
COUNBIL, U
CQUNSIL, H
0
0
0
0
0
B00717Q519
BOO 701 0328
B00717O330
BOO 7 170330
B00721O520*
50-423 Q
50-345 P
50-213 Q
80-313 0
50-423 B
CQUNBIL. W
COUNBIL, W
COUNSIL. H
COUNSIL, H
COUNSIL, W
0
0
0
0
0
B00701O337
8007030356
B00701O337
8007010354
B007030356
50-2 1 3 F
50-345 F
50-213 F
50-423 Q
50-245 F
COUNSIL. W
COUNSIL. W
COUNBIL, W
COUNSIL, U
CQUNSIL, W
0
0
0
0
0
B00701O337
00070902*74
B007180137
8007020569
B0071B0578
50-2 1 3 F
PRM
50-213 0
50-313 P
50-213 0
CDUNSIL, W
COUNSIL, W
COUNSIL, W
CDUNSIL, W
COUNSIL, H
oooc. o
B007020569
S007230048
B007290B52
B0070B0164
8007290052
90-213 P
PRM
PH
50-336 P
PR
COUNSIL, W
CCUNBIL, W
COUNBIL, W
COUNBIL, 14
CQUNSIL. W
fi
0
0
0
0
BQ0708QI35
0007090231
8007070251
8007090331
8007170433
30-245 P
50-213 F
90-245 P
30-213 F
90-213 F
COUN9IL, W
CQUNSIL.tJ
COUNSIL.U
COUNSIL, U
COUNBIL, W
fi
0
D
0
fi
8007170429
B00710Q300
0007210387
BOO? 140344
0007210237
50-213 P
50-243 P
30-249 P
50-336 P
30-2 1 3 P
CQUNSIL. W
COUNSIL, W
COUNBIL.W
CDUNSIL, W
CQUNSIL, W
0
0
fi
0
0
0007 160369
0007210238
8007300324
80Q722O457
BOO 7250300
50-213 Q
30-336 P
50-213 P
SO-24 9 P
50-249 P
COUNBIL. W
COUNSIL, W
COUNSIL, W
COUNSIL. W
CDUAN.F E
fi
0
0
0
0007240053
0007240067
S007280S74
8007380673
800702O60S
50-213 P
30-2 1 3 P
80-24 9 P
30-213 P
50-498 0
COWAN, F
COMAN.fi Z
COWAN, D Z
COWAN, B Z
COWAN, D Z
0007300406
B00722096Q
B007220560
8007250683
8007230693
30-490 0
XPORTLIC
XPCJIITLIC
XPORTLIC
XPORTLIC
COX,F T
COX, 8
CRABTREE, R
CRADDICK.W
CRAMER, E N
A
0
8007110056
8007020433*
8007080217
8007300575
80071 40091*
PR
30-271 H
SO-309 I
NUREO
PR
CRAMER, E M
CRANE, P A
CRANE, P A
CRANE, P A
CRANE, P A
Q0071 40036
B00723Q66B
8007330663
80072B0697
B007230016
PR
50-133 Q
50-133 Q
50-279 Q
30-133 Q
CRANE. P A
CRANE, P A
CRANE. P A
CRANE. P A
CRANE. P A
B007240187
0007250658
8007140242
8007020394
8007010469
80-275 Q
80-279 0
71-9094
80-275 A
80-133 P
CRANE, P A
CRANE, P A
CRANE, P A
CRANE. P A
CRANE. P A
00070 70 1 53
B0073002BO
8007160520
CQ073IO46B
8007190377
SO-273 A
90-275 0
50-275 A
SO- 133 0
50-273 F
CRANE, P A
CRANE, P A
CRANE, P A
CREED, J n
CREED, J R
B00710040S
B007 100340
0007180398
0007010378*
80073 1OS6 7*
50-279 0
50-273 A
50-133 0
70-130B
30-309 Q
CREIQHTON. '
CRERAR.D A
CREWS, J L
CREWS, E H
CREWS, J L
r
8007220224*
0007090269
8007170569*
8007110489
8007220330
MI8C
50-10 D
50-306 0
30-395 5
30-73 0
CREWS, J L
CREWS, J L
CREWS. J L
CREWS, J L
CREWS, J L
8007S1O099
8007170084
8007240309
8007340407
8007240367
30-224 0
30-133 Q
30-278 Q
50-312 0
SO-206 0
AUTHOR
ACCEBSIOW
NUMBER
SUBJECT
CATEGORY
CREUB.E H
B007O90011
50-395
A
CREUSiJ L
Q007170561
50-206
Q
CREUB.E H
8007080393
90-395
A
CREWS, E H
8007230219
50-395
0
CREWS, J L
8007310294
50-312
<J
CREWS. E H
800707D269
90-399
C
CREM3.E H
0007160252
50-395
A
CREWS. d L
8007300293
50-344
0
CREWS, J L
800730033?
50-2O6
0
CREWS, J L
8007300519
50-344
0
CREWS, J L
8007310321
50-37 B
Q
CREWS. E H
B007 170607
SO-395
A
CREWS, E H
8007220390
50-393
F
CREWS, E H
B007220423
50-393
A
CREWS, E H
B007350308
50-393
A
CREWS. E H
8007230459
30-399
S
CHEWS, E H
3007230491
50-393
A
CREWS, C H
8007290626
30-399
F
CRISCIONE, J L
Q00723041O*
90-336
S
CRNICH. J
80070B023?"
30-3Q3
S
CROCKER, It U
8007130163*
70-364
CROCKER, H U
8007090373"
30-371
0
CROCKER. H U
B005290612"
PT9
CROCKER, M H
B007190314
70-2631
CROCKER. H U
8007020121*
70-1100
CflOCKER.H U
9005290603
PT9
CROCKER, H U
3007310291
70-474
CROCKER, H U
B00714O631»
40-0702
CROCKER, H If
8007 140627
40-B702
CROCKER.il U
B007210193*
70-33
CROCKER, H U
aoo7230fioa*
70-2000
CROCKER. H V
B007O 10597
70-2374
CROCKER. H H
B00721019Q»
70-1143
CROCKER, H H
BOO7230212
SQ-245
B
CROCKET, L
BOO73100I9
30-219
P
CROLEY, B 0
a00717O612»
30-393
A
CRDBDY. P J
B007330574*
50-219
B
CROSSMAN.U A
SQ0701O212"
30-498
0
CRQBSMAH.W A
6007110076*
50-383
Q
CRdSSMAU.U A
8007070091*
30-482
Q
GROSSMAN, H A
GOO711019B"
50-462
a
GROSSMAN, W A
60O7100346*
50-498
a
GROSSMAN, W A
B007J10234»
50-445
a
CROSSHAN, W A
B007B40337*
30-498
Q
GROSSMAN, W A
B 00703 0068
50-482
s
CROSS. J L
H00702O740
50-337
Q
cnoaawAM.u A
8007160974*
30-445
a
GROSSMAN, W A
B00723O292*
50-498
a
CRD3SMAN. H A
80072B0193*
30-3B2
Q
CROSS, J L
800731O103
50-259
0
CROSS, J L
8007S50596
50-259
Q
CROSS, J L
8007310067
5O-259
0
CROSB,J L
BO 0730 0374
50-327
K
CRQUSE.R P
BOO7O 10294
30-346
Q
CFiOUBE, R P
B00724Q02B*
50-346
Q
CRQUSE.R P
B007O30040
90-344.
Q
GROUSE, R P
8007130924
50-346
Q
CROUSE, R P
H00717C-064
30-346
a
CRQUSE, R P
Q0071B0310
S0-34i
a
CROUBE, R P
8007140237
30-346
a
CRDUSE. R P
G00701O464
50-346
p
CRDUSE. R P
8007330076
90-346
a
GROUSE, R P
800723O141
50-346
a
CROUSE, R P
800/170532
50-346
a
CF10UBE. R P
B0071SO271
50-346
a
CRQUSE.ft P
8007300141
PR
CROUSE, R P
8007090294
50-346
F
CRQUSE.fl P
8007210216
30-346
Q
CROUSE.fi P
B00731O536*
50-346
a
CROUSE, R P
BO 07 180 670
30-346
p
CHOUSE, R P
BOO723020Q
50-346
a
CROUSE, R P
BO 07330 SOD
50-346
a
GROUSE, R P
8007250372
50-346
a
CROUSE. R P
BOO7B1O434
50-346
p
CRQtfSEiR P
8007290300
50-346
Q
CROUBE, R P
8007310348
30-346
Q
CROUSE, R P
8007230581
50-346
P
CROUSE, R P
800735O427
50-346
P
CRQUSE.R P
B0072S0392
50-346
P
CRQUSE.fi P
8007230434
30-346
P
CROUSE, R. P
8007230483
90-346
P
GROUSE, R. P
BOO 73 10300
30-346
P
CRQH, M T,
BOO 70 10027
70-2909
CROW, M T
SOO 7280 179
70-143
CROW, W, T
8007O20337
70-B24
AUTHCF1
ACCESSION
NUHGER
BUHJPCT
CATEOOFtY
CROU, U T
B0070101B4it
70-38Q5
CROW, U T
a007020233»
70-2910
CROW, U T
aoo703ooaB»
70-1 131
CROW, U T
B0072BO327*
70-1319
CROW, H 7
B007220220J
70-135
CHOW, U T
B007070195*
70-1 1 13
CHQU, U T
Q0071B0070
70-1151
CROU, U T
800723OQ62"
70 -237 S
CROW. \l T
eoo72-toa9o»
70-1738
CROU, IJ T
600/34O1 10-"
70-1201
CROW. VI T
e00724C-123>t
70-27
•CROW. W T
0 007290 OBD*
70-143
CROWE, Q M
B0073001 13
PR
CROWELV, D R
8007070107"
30-335
n
CROWLEV, D R
8007100060*
50-231
d
C ROWLEY, D ft
B007390433«
30~'3£i6
o
c ROWLEY, n n
G007310901*
30-370
0
CflOWN, H M
B00711O539*
CONTflACT
CJ1UHP.M W
6007110246*
TOPREP
CJiUTCHFIELD, D
B007100097
30-206
P
CRUTCHFIELD, D
0007100102-
90-206
1'
CRUTCHFIELD, D
E30071001O7"
90-206
P
CRUTCHFIELD, D
3007030333
30-133
P
CnUTCIFICLD.D
6007 B 003 fH
90-317
P
CRUTCHFtELO, 0
B00710040U
50-21?
P
CRUTCHI-IELD,D
B00710040B1
&0-219
P
CRUTCHFIELD, D
0007160421
90-29
P
CRUTCHrlELD, D
8007160423*
50-39
F»
CRUTCHCIELD, D
0007160427*
50-29
F1
CRUJTCHriELl), D
0007230541
50-155
F'
CnUTCHFlELD, D
BQ07250B46
50-248
n
CRUTCHFIELD- D
D007250534.
90-219
F1
CfiUTCHFIELD, D
0007330B5Q
90-10
P
CRUTCHFIELD, D
8007010003
50-237
I'
CRUTCHFIGLD, D
0007100396
90-233
t>
CRUTCHFIELD.D
0007100299"
50-255
F>
CRUTCHFIELD.U
8007110247
90-235
r1
CRUTCHFIELD. D
00071 10234"
90-333
F>
CRUTCHFIELD. D
B007OI01 11
30-153
P
CRUTCHFICLD, D
8007010113
90-311?
I'
CRUTCHFIELD. D
B007010110
90-39
!>
CRUTCHFIELD, B
8007010120
90-409
P
CflUTCHFlCLD.D
B007010122
50-213
1'
CnUTCHFlELD.D
G00701O134
90-244
F'
CHUTCHF1ELD, D
B007010130
50-B43
n
CRUTCH? I CLD.D
8007010137
50-206
i1
CRUTCHFIELD. D
0007010146
50-1O
c
CRUTCHFIELD. 1)
Q007Oa01BA
90-10
p
CRUTCHFIELD. D
8007020190
90-206
F1
CRUTCHF1CLD.D
8007020193
30-219
F
CRUTCHFIELD.D
GQQ703QHO2
90-409
n
CRUTCHFICLD.D
800/030663
30-10
a
CRUTCHFIfLO.D
8007020666
'30-219
a
CRUTCuriCLD,!)
Q007020A69
t)0-2<]5
a
CHUTCHFICLD.D
00070 ao&76
30-133
a
CRUTCHfieLD,!)
9007010043
•30-10
c
CRUTCHFIELD.D
Q0070102I7
50-10
F'
CRUTCHFICLD,D
B0070 1 Q293
50-10
r1
CRUTCHFIELD, D
Q007 140623
50-244
r>
CRUTCHPIELD.D
B007 140620*
50-244
r1
CRUTCHFIELD-D
GOO/l406aA»
50-244
p
CRUTCHFIELD,D
[30071/00-12-
50-153
F--
CRUTCHFItLUrD
H007 1/0240
30- 40V
r
CRUTCHFIELD, D
BOO 70 204 79
30-10
r1
CRUTCHFIELD, D
B007 160439
50-10
n
CRUTCHFIELD, D
B007ia02D*?
30-23B
p
CRUTCHFJELD, D
UOO 733066 A
30-333
i'
CHUT C HP I ELD, D
QG072Q01O7
30-244
p
CflUTCHFlELD, D
80071001(10
30-139
H
CF1UKHFJELD, D
90073301 !)0
30-206
p
CRUTCHFIELD, D
3007220 liS»
80-206
n
CRUTCHFIELD, D
Q007320169*
30-206
c
CRUTCHFIELD,!)
000724006<?
90-244
p
CRUTCHFIELD, II
30071402^6
90-155
H
CRUTCHPICLD, »
(3007340073
30-248
F'
CRUTCHF1ELD.D
BOO/340079
90-109
F*
CnUKHrlELD,D
QDO/1HO.I36
30-10
F'
CRUTCHFIELD, D
B007 180433
30-10
P
CRUTCHCIELD, D
BOO/IQ04AA
30-29
P
CHUKHF1ELD, I)
00072I063B
30-409
F|
CRUTCHFIELD, I)
800/3301 1 I
50-243
11
CRUTCHriELD, D
BOQ724Q29S.
30-10
F)
CRUTCHFIELD, D
800/?SOi,93
30-333
1'
CRUTCHriELO, D
60072S0694
50-313
1'
CRUTCHFIELD, D
800/200103
50-213
H
430
PERSONAL AUTHOR INDEX
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
CKUrCHFrELI),D
HOD 7390373
SO-ISS
P
cRurcHFreLO,D
8007170049
SO-206
H
CRUTCHFIELD, D
80Q73BO]5Q
50-213
P
CRUTCHFIGLD.D
8007350716
50-219
P
CRUTCHPFELD, D
B0072BQ172
50-206
P
CRUTCHFTCLD, D
GOQ7290364
30-155
P
CHUTCHF1ELD, D
B007180S9A
50-213
F
CHUVCHFfELD* D
8007240144
50-B44
P
CBUTCHFTCLD., 0
B007SS01SO
50-213
P
CRUrCHFlELD, D
8007250032
50-10
P
CRUTCHF1ELD, D
6007380 142
50-244
a
CHUTCHFlELDjD
8007230161
50-255
p
CRUTCHFIELD., D
BQ072S020&
50-213
p
CRUrCHFlELD.D
Q00724025O
90-10
F
CRUTCHFIELD, 0
6007230691
50-219
P
CRUTCHFIELD. D
S007S90673
5O-213
P
CJIUTCHPIELD. 0
S007B30720
5O-21 9
P
•CRUTCHF1ELD. 0
8007200098
50-206
P
tftUTCHflCI-D, 0
Q00723013S
50-244
P
CnUTCHPIELD. D
8007230190
50-409
P
CRUTCHFIELD.D
9007300050
50-244
F
CULP.fi H
Q00709005G
50-466
0
CULP.f! H
Q007080050
50-466
0
CULVER, J F
9007020444
PR
CULVER.M H
B007150713'
50-302
R
CUNNINGHAM, 0 E
3007010595
71-3980
CWNINOHAMrO E
9006190918
71-9139
CUNNINGHAM, R E
8007020073
50-301
P
CUNNINGHAM, R E
8007140580
50-201
P
CUNNINGHAM, 0 E
8007190460
71-9136
CUNNINOKAM, A L
8007290404*
50-390
n
CUNNINGHAM, A L
8007290833*
50-328
a
CUNNINGHAM, 0 E
Q007 230059
71-170
CUNHINOHfcM, Q H
BQQ7300411
PR
CUNNINOHAMi 0 H
9007220003
70-143
CU.1N1NOHAI1, R
D0073103G3
SQ-5
F
CU/1RAN.J M
90070 1 0337*
30-306
B
(WUHAN. 0,11
Q007OB04IO*
30-206
S
CUnflAN.J M
00071 S0599
50-206
R
CUfiltAN.J M
8-0072G039&*
30-206
3
CURRV. J B
G 007300971
PR
CURTIB.J R
C007S30297*
30-206
a
CURTIS. J
0007O300S1
30-206
3
CURTIS. J R
Q007310I&QH
50-288
a
CURTIS. H IJ
8007230147
PR
CURTIS. J IJ
8007110-376*
50-327
B
CUI1TIS. J H
B007H90659*
30-327
3
CUflTCS.N II
8007OB0213
50-397
3
CUJlTrS.N M
B0070B0240
30-337
K.
CUJ1TES.N W
H007140177
90-337
B
cujins.N H
8007140340
30-337
S
CUJITIS.N H
6007140170
30-337
G
CUIiTIS.N W
6007180434
30-337
E
CUflTIB.N U
B007240131
30-337
K
CUfiTI8,N H
8007180232
50-387
S
CWRtrB.N W
B0071B0364
30-3Q7
3
CURTrBrM W
BOO 7340 1*2"
80-397
K
CURTtB, N W
30 07220<Ht
30-337
F
CURTfS, M W
SO 07250 529
90-337
A
CUBTTS. N W
SO 07250 4 87
30-337
S
CURT I S. H M
B0072B021 5
30-387
e
CURTIS, N W
RO 07290 4 99
30-387
B
CURTIS, N M
0007290.623
50-38i7
S
CURTIS, N,U
8007290264
50-397
e
CURTIS, N «
6007270716
30-367
B
CUflTNEflrA P
00072304 73
SO-1E4
p
curcimw H
8007010274
BO-3B7
0
CUTCHHI.J M
B007O10273
SO-3B7
0
CUTCHIHf J M
80071 50709
30-3B7
Q
CYPHERT.S D,
8007170361
50-443
n
CYPHERTrS 0
0007160547
30-449.
n
CYPHEHT,S n
B007300419
30-445
H
CVRpK
8007300390*
50-266
0
CVR.K D
8007100241
30-264
0
CYR.K D
Q007290070
30-266
0
CZYBCrNQKI.K S
00072 10003
RES
CZV8CIN3K1.K 6
8007310471
HUREO
D'AMdRE. «
B0072I0077*
70-1131
DAODJARTBSQM.B
8007310233
HUREO
DAtL.L C,
800703018911
50-413
A
DAIL.L, C
8047210486*
30-413
A
DA1L.L C
S00723Q532
50-488
Q
DALE. L F.
80071&0617*
50-4 Ji
A
DALE, L F
SCO 70206 19
30-416
8
DALE. L F
80071 30579
PR
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATECOJtY
DALE,L r
9007160419
PR
DALE.L F
B00716061O
50-416 A
DALE, L F
90070701 1&
PR
DALE, L F
00072 5052O*
50-416 8
DALE.L F
B00701036I
30-416 F
DALE,L F
3007030245
30-416 A
DALE.L F
8007070243
30-416 E
DALE.L F
8007210270
50-416 Q
DALE,L F
6007110412
50-416 K
DALE. L F
B007H03B8
50-416 E
DALE.L F
0007230494
50-416 A
DftLE.L F
6007180293
50-416 F
DALE, L F
B007220569
50-416 A
DALTflQFF.S L
B007210215>
50-277 Q
DALIflGFF.S L
5007010378
50-277 0
DALTfiQFF.& L
B 007020072
50-277 Q
DflLTfiOFF.S L
B007180I06
50-277 Q
DALTflDFF.S L
6007190117
50-277 Q
DALTflOFF.S L
B007 170507
50-277 Q
DALTilOFF.S L
B0072 40003
PR
DALTfiOFF.S L
B007250631
50-277 0
DALTRGFF.B L
800721 0947
50-277 0
DALTRDFF.S L.
SQ0723Q3J 1
50-277 Q
DANCE, H C
B0070 100B9
50-327 8
DANCE, H C
6007240292*
50-321 0
DANCE, H C
8007280484*
30-259 Q
DANCE, H C
B0071O0066*
3-0-321 Q
DANCE, H C
8007170224*
50-327 0
DANCE, H C
0007310351*
50-359 0
DANFORTH.J C
8007110571*
50-482 U
DAN1ELBON, D H
8007160741*
30-440 0.
DANIELBDN, D K
a007160519*
50-456 Q
DANIELS- F T
8007240253*
SO-35B Q
DANIELSON. D H
fl 00723-0087*
50-358 Q
DANIELSQN, L J
a0071B0153
REQQD
PAHIELSON, D H
8007230333*
50-346 0
DANIELSON, D H
8007230373*
50-304 Q
DANIELSON, D H
ao0723075B*
50-295 0
DANIE4.BQN, D H
800723-0273*
50-373 0
DANIELSOH, & H
S0073 10316*
30-2&& Q
DANIEL, S L
8007290251
MUREO
DARI03, E L
B007020307
PR
DAfiHTTZEL.R U
8007010349
TOPHEP
DARMlTIEL.fi IJ
9007160360
30-70 P
DARMITZEL.J! IJ
8007220349
90-70 P
DAROie.E L
8007020329
PR
DrtUCE, It
8004240250
BO -327 B
DAVIDEON, R II
G00710032B
Pfi
DAVID6QM, D R
6 007 IB 0585*
8-0-440 Q
DAVIDSON, D R
B0071H0591*
30-440 Q
DAVIDBOM, D ft
BO0714O334
30-440 S
DAVIDSON, D ft
B0070D0294
50-440 S
DAVIDBOM, D fi
BO07I30353
30-440 Q
DAVIDSOM. D R
8007230101
50-440 Q
DAVIDEDH, D R
8007230321*
50-440 Q
DMMDEmD R
B007JS0540
50-440 A
DfWIDSflN. D n
8-007 IB 0406
50-440 Q
DAVIDSON, D R
8Q07U059B
50-440 B
DAVI8.S
8007140611
PR
DAVIS. H A
Q007O30024
PR
DAVIS, A B
8O0424025B
ItE
DAVtS.A 0
SQQ4S40K76
It.E
DAVIS. J H
B00707O019*
70-143
DAVtS.R E
BC-072 1 0007
RES
DAVIS. J P
B007030050*
PR
DAVtB.A D
B007 100096
50-546 Q
DAV[S.A 0
GD07140D35
70-B
DAVrs.A D
D007100005
50-409 0
DAVIS, A S
8007170548
50-315 0
DAVrS^O, R
B007I10454
KA3TE HOT
DAVIS, 0 R
600711Ofl57»
HftSTE MOT
DAVI9, A S
8007170300
70-925
DAV 19, A B
800714-0464
50-346 Q
DAVIS, A B
B00711O200
50-10 0
DAVIS, A B
8007280454
30-87 0
DAVIS, A D
8007210501
50-263 Q
DAVIS, A 19
B00723OSA9
50-295 0
DAVIS, A D
800716O700
40-7982
DAVIS, A B
800731O33S
50-295 Q
DAVIS, A D
800725062A
70-928
DAVI8, J F
B007290&22
50-312 P
DAVIS, J P
800721O473
50-3 R
DAV 19, L D
8007210436
30-361 0
DAVI3, A JJ
800728O71O
70-928
DAVIS, L D
80Q7I6O613
50-369 0
AUTHOR
ACCESSION
NUMBER
SUBJECT
CftTEOORV
DAVIS, A B
DAVIS, S M
DAVIS, B M
DAV 1 S, B M
DAWSON. R S
B007230549
BQ072401S3*
BOD72B0453*
B0072B0676*
8007290277
70-923
30-318 8
30-317 B
SO-317 B
71-6717
DAUSON, » H
DAWSON. R S
DAWSOM, R
DEAtE, V B
DEAN, D
B007020611*
BOO 7220279
BOQ7290282*
6007110042
B007240472
7o-iaoa
71-9039
71-6717
50-522 0
XPORTLIC
DEAEOM, V A
DEBOER.T K
DECKARD, J
DECKER, T
DEHART. R M
6007290191
B007 1 50067
8007230246*
BOQ7170536*
6007130077
HES
PF1
30-346 U
30-313 d
PR
PELANEY. J C
DELANEY. J C
DELANEY. J C
DELANEY. J C
DELXiMEY, J C
B0070101B4*
6007010199*
BOO 7020431*
6007020233*
B007020296
70-3883
70-soaa
70-2&09
70-2710
70-143
OEUANEY, J C
DELANEY. J C
DELAHEV. J C
DELAHEY. J, C
DELANEV. J C
BOO 7020304
6007240102*
BOO 7230062*
6007240290*
BOO 7290063*
70-143
70-1339
70-237S
70-173B
70- 1 43
DELO-EOROE. L 0
DELOEOHCE, L O
DELOEOKQE. L O
BELLA RATTA. A
QELONO, S D
8007020076
BOO 7070267
6007160606
BQQ72B0746*
B007 150623*
30-295 0
50-373 K
30-373 A
70-1100
30-313 S
DENNISON. A B
DENNIBDN,A B
DENNY. I L
DENTOM. H R
DENTON.H R
6007110094
6007110094
B00721010B
B00711054H
B00710009B
30-3 5fl 0
50-35B 0
40-2061
SECY
SECY
DENTON. H R
DENTON, H R
DENTON, H R
DENTON< H H
DENTON, H R
6007010213*
B0071700B3
BOO -1240400
B0071607B6
B0071B04B1
FOIA '
30-320 P
30-2B6 P
SECY
30-333 H
DENTON, H R
DENTON, H R
DENTON, H R
DENTON, K R
DENTOH, K R
B0071 10333
B0071BQ463
6007180468
BOO 7 160067
6007100474
30-293 H
50-320 II
30-320 H
30-320 H
30-320 11
DENTON. K R
DENTON, K, R
DENTOM. H R
DENTON. K R
DENTON. H R
6007100492
6007230179
B0071B0060
6007180182
B007ia043B
30-3120 H
SECY
30-219 K
30-320 H
30-339 H
DENTON.K R
DENTON.H R
DENTQN.K R
DENTQN. H R
DENTON.H R
6007290099
Q007 160731
B007E 10046
8007090021*
B0071S0546
mac
30-330 H
30-320 H
SECY
30-320 H
DENTQM- K, R
DENTQN.H R
DENTON.K R
DENTON, K R
DENTON.H R
6007 1905 S3
B00721020B
6006300097
80070200SS
B007 100207
30-320 H
30-330 H
ACR8
30-320 H
30-3O2 P
DENTON.H R
DENTON. H, R
DENTON. K R
DENTON.H R
DENTON.H R
80Q7P30611
8007180004
8007180042
B0071 10195
8007010246
COMMISSION
90-320 P
30-322 H
NUREQ
30-3HO H
DENTON. K R
DENTON.H R
DENTON.H R
DENTON.H R
DENTON.H R
8007020677
8007100392
8007110483
0007170S4B
0007180224
90-320 H
MIBC
90-320 H
30-330 H
MIBC
DENTON.H R
DENTON.H R
DENTON. H R
DENTON, H R
DENTON. H R
0007210530
0007170551
8007210645*
8007210647*
B007020090
50-320 H
30-320 H
80-301 0
30-301 0
50-443 H
DENTOM.H R
DENTOM. H R
DENTdH. H R
DENT OH. H, R
DENTON. H R
BQ07020432
B007030437*
S007100421
6007100424
BOO 7 140269*
30-271 0
30-271 0
30-443 H
80-443 H
30-346 H
DENTQN. H R
DENTON.H R
DENTdN.H R
DENTON.H R
DENTON.H R
8007180462
6007020325
BOO 7 I 40060
6007280593*
B0070102S6
MIBC
COMMISSION
50-320 0
50-320 0
30-404 o
PERSONAL AUTHOR INDEX
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
DENTOM, H n
DENTDN.H R
DENTQN. H R
DENTDN- H R
DENTQN, H R
8007010263*
8007010272
6007030210
B00729O047
G00710O145
50-484 0
30-404 0
50-273 P
30-320 H
50-32O H
DENTOM, H R
DENTON, H R
DENTQN, H R
DENTON. H R
DENTON, H R
8007100399
800729O064
S007Q2O243
B00702Q4S1
B0070204B5*
80-10 P
50-32O H
50-312 0
50-3 0
SO-3 0
DENTOM, H R
DEHTON, H R
DENTON, H R
DENTON. H R
DENTON, H R
8007020690
B00714O106
9007070059
8007070064*
BOQ7070069*
50-528 Q
50-437 H
50-280 H
50-200 H
50-300 H
DENTOM, H R
DENTON, H R
DENTON, H R
DENTQN, H n
DENTON, H R
8007110464
Q007H0021
B0070E0399
B007B9O273
B0072902B7*
SECY
50-323 H
50-320 P
50-327 0
50-337 0
DENTOH, H R
DENTOM, H R
DENTON, H R
DENTOH, H R
DENTON, H R
80071100B2
B00711O556
B007110963*
8007170330*
B007 170333*
30-271 H
50-133 0
50-133 0
30-10 0
50-10 0
DENTON, H R
DENTON, H R
DENTON, H R
DENTON, H R
DENTdN, H R
B007170336*
B007230223
B00723Q626
B0072Q0122
0007290054
30-10 0
30-320 H
SO-32O H
50-3SO H
30-32O H
DENTQN, H R
DENTON, H R
DENTOM, H R
DENTOM, H R
DENTOM, H R
8007300013
BOQ7230542
8007E3O070
B007a3OQBl
B007290236
30-320 H
50-440 H
30-32O H
50-3SQ H
50-312 H
DENTOM- H R
DENTOW, H R
DENTCWrH R
DENTOM. H R
DENTON. H R
80071 4OS72
0007220027
80072S0129
8007300301
B00717O439
REOGD
50-366 H
50-320 P
XPORTL1C
50-339 P
DENTON, H R
DENTDN. H R
DENTON. H R
DENTON, H R
DENTON. H R
0007170443*
B007190174
8007800183
0007280031
B007E302B6
50-339 p
REOSD
30-32O H
50-209 H
30-320 H
DENTON, H R
DENTON, H ft
DENTON, H K
DENTON, H n
DENTON, H R
80072SO72I
8007210643
0007330569
0007240297
8007249302*
COMMISSION
30-301 0
SO-38O H
30-337 P
SO-327 P
DENTON, H R
DENTON, H R
DENTON, H R
DENTON, H R
DENTON. H R
0Q072S0624
800720O14?
0007290039
000725Q699
S007200076
50-289 H
30-361 H
PRQJ
MIBC
50-10 P
DENTON, H R
DENTON, H R
DENTON, H R
DENTON, H R
DENTON, H R
8007290031
00072Q0106
0007290034
8007310949*
000730O284
50-289 H
50-320 H
50-483 A
FDIA
30-239 P
DEPOOHTER. J
DEVELIN, J, H
DEVINE, J
DEVINCENTI8, J
DEVINCENTlB.O
0007160405
0007 1406 IS
800731O266*
0007010223*
8007170596*
PR
30-334 0
FOIA
50-443 Q
30-443 0
DEVINCENTIS, J
DEVINE, J D
DEVINE, J G
DEVINE, J 0
DEVINE, J 5
8007850623
000731O039
8007310194
8007300037
800731O52H
50-443 Q
XPORTLIC
XPOHTLIC
XPORTLIC
XPORTLIC
DEVLIN, J W
DEVLIN, J W
DEVLIN, J U
DEVLIN, J W
DEVLIN, J W
B00710O074*
0005230131
B00724Q059*
B007230308*
0007290199*
50-293 Q
50-245 fi
XPORTLIC
50-2B9 Q
50-244 Q
DEVLIN, J W
DEWEASE. J 0
DEWEY, L S,
DEHEY, L B,
DEWITT, R Q
8007230366*
80072B0443
80071B0719
800723O407
B007100B01*
30-213 Q
50-259 R
80-250 M
50-369 M
50-255 P
DEMITT.fi 8
DHILLDN. H
DIAMOND, M J
DICK. J W
DICKERBON. M W
80071 10209*
8007010619*
0007110101
0007310246
8007130091*
30-153 p
CONTRACT
PR
NUREO
30-267 0
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
DICKINSDN.P
DICKEQN, H W
DJCKfiQN, H H
DICKSON, H IJ
DICKSON. F 3
QOO70IO013
80O71B0353
BOO71'10Q31
BQ07I 40634
B0072G0333
dRO
RES
REB
RES
40-8743
DICKSON, H W
DICKSGN, H IJ
DIEHL, D S
DICTCH, R
DIETCH, R
ao07300Q4!
8007310251
9007030003
BQO702O362
BOO702Q366*
MURED
RES
PR
90-206 P
50-206 P
DIGQS.R 11
DIQQS.R H
DIMEGLIO, A F
DIMEGLIO, A F
D1NCAUZE, D F
8007030510
B007StO156
B007090272
aoo72ioii0
B007 10007?
50-277 P
50-331 P
50-193 P
71-17
PR
DIPIA*ZA,R P
DIP1AZZA.R P
DIP1AZZA, F! P
D1PIAZZA,R P
DIPIAZZA,R P
9006300292
9006300017
BOO702O221
B00710035B
B007110522
70-1131
70-1151
70-1143
PRM
PRM
DIPIAZZA.fi P
DIPIAZZA.fi P
DIRCKB, H J
DIRCKS.W J
DIRCKS.W J
B0o71fl0565
0007240096
B007300103*
6-007020379*
8007300094"
70-1131
71-5430
70-143
WASTE MOT
70-143
D1RCKS, W J
D1RCKS, W J
DIRCKS.W J
DIRCKS.W j
DIHCKS.W J
8 0071 -KM 02*
SOO53OO252
8007090033*.
8007390286
8007290029*
90-397 0
30-320 U
SECY
Pfl
SECY
DlfiCKS.W J
DIfiCKS.W J
DIRCKS.W J
DIRCKS.W J
DIRCKS.W J
8007390059
aoo7i4oiie*
B 007290038
80O72SOOI9"
8007160848
SQ-341 l<
50-277 H
SECY
10CFR
COMMISSION
DIRCKS.W J
DIRCK8, W J
DIRCK8. U J
DIRCKS, W J
DIRCKB, U J
6007160B54
8OQ71BOQ17
BQ06270101
6007030229
6007020264
COMMISSION
StJiti Pros
30-133 H
90-32C H
UABTE MOT
DIRCKS, H J
DIRCKB, U, J
DIRCKB, U J
DIRCKB.U J
DIRCKS, U J
80070201 13
600701O12B
B0070ZO117
0007020198
6007020033
Statt Prog
Btatt Profl
30-271 M
50-324 H
30-500 H
DIIICKS, H J
DIRCKB, U J
DIRCKS, U J
DIRCKB, U J
DIRCKB, U J
BQ0702O091
6007020069
B007020QBH
BQQ7230117
6007110321
50-320 H
HI8C
50-10 U
50-201 P
11 ISC
DIRCKB, U J
DIRCK9, U J
DIHCKS.U J
DIRCKB, U J
DIRCKS, W J
B007 140230
B00711O306
6007110335
6007110338
8007240132
30-10 H
90-339 H
HISC
90-353 U
MURED
DIRCKS, 14 J
DIRCKB, H J
DIRCKB, W J
DIRCKS, W J
DIfiCKS.W J
8007250229
6007B5O277
B0072OO3a3
HOQ72SOS49
flQ07 180214
50-346 U
50-275 H
50-3H9 H
30-171 H
Sbatd Pros
DIRCKS, H J
DIRCKS, U J
DIRCKS.W J
DIRCKS.W J
DIRCKS.U J
S 007230291
B 00723 O509
B057 150743
8007253167
800728-07 13
50-317 H
30-483 U
FQIA
SO-3HQ H
PR
DIRCKS, U J
DIRCKS.W J
DIRCKS, N J
DIRCKS, W J
DIRCKS, H J
60072SO7I6
6007240444
BOQ72SO062
B007250061*
6007310259
PR
50-333 H
30-330 H
FQIA
FOIA
DIRCKB, U J
DIRCKB, U- J
DIRK, H
DICE, 0 P
DI6E, D P
8007310526
6007310933
B007240413*
8007130122
B007070P6I
50-2B3 H
30-158 H
90-2B9 H
PR
50-220 P
DI3E, 0 P
DISE, D P
DISE, D P
DIXOH.O A
DIXOM, B
6007Q7QQB9
0007300049
6007170394*
8007280604*
6007290S03
50-220 0
Pft
50-230 P
50-40<9 o
30-344 0
DOAN, P F
DOH3QN, U Q
DODDa.R T
DODDS.R T
DODD9.fi T
BOQ709Q007*
60073 103B6
6007230639*
8007020191*
0007170270*
50-298 B
50-329 A
50-397 Q
30-3fil Q
50-5SB 0
AUTHDSt
ACCESS 10M
NUMOFtt
SUHJECT
CftTCQQHV
DODD3, R T
DODOS, R T
DODD3, R T
DQDD9, R T
DQDD3, fi T
B0071V0937"
B00710001B>
BOO'7ai057ES<'
G0ft72fl0326»
B0072fl0314>>
90-36,1 Q
50-206 0
SQ-52B 0
30-206 0
30-344 0
DODDB.R T
DDDD6, R T
DOUOETT, fi f<
OOHERTY, J F
UOHERTY, J F
000 7300319"
00073tOS16«
E5Q0710Q174
0007030331"
000 7 230244
50-361 0
so-sas o
SO-J66 0
SO-466 A
90-46A 0
DOLAN, F X
ilOLAN, J E
riOLAN, J E
DDLAN, J E
DDLAN, J E
0007330334.
E!00/3l020il»
0007 11 046 5
Q007030B06
B007 0202-1 9
TOPHEP
30-315 Q
50-313 Q
50-313 Q
50-315 0
DOLAN, J E
DOLE, fi
DON AT, T J
DONAT, T J
DONEOAN, » C
9007020391
SQ07I 10571"
B007240377*
B0073 00330
000730031 5«
50-313 P
50-406 U
50-36-J 0
SO-3&") 3
OA999
DONdOHUe, D J
DQNDVAN.t J
DDRFHAN,*. 0
DanN9IFE,W P
DQRNalFE.U P
B0072?0023
B0072 30476
B007110327*
8007H0046*
3007140046"
BECY
TtlPREP
(1IBC
PR
PR
I10TZLER, T
DOUGHERTY, D J
DOUOHCftTV, D K
DOUGHERTY, D J
DOUGHERTY, D J
B007290296'
800731 0192 "
8007230111*
B007H0633*
H0070103B2"
30-337 0
FOIA
HASTE MOT
COW TRACT
CONTRACT
DOUQHEHTY, D J
DOUOHERTY, D J
DOUGHERTY, D J
DDUOHERTY, D J
DDUOHERTY, D J
B007030Q71-*
B007030357-"
B00711037S*
B00707O052
G00707O0943I
CONTRACT
CONTRACT
CfJNTRACT
CDN TRACT
CONTRACT
DOUGHERTY. D J
DOUGHERTY, 0 J
DOUGHERTY- D j
DOUGHERTY^ D J
DOUGHERTY, D J
H00707G057*
fi 0070700 SO"
S007O7O060*
(1007O7O06K*
aooyiibOfloo
CONTRACT
CONTRACT
CONTRACT
CON (It ACT
CONTACT
DOUGHERTY, D 0
DOUOHERTY. » J
DOUGHERTY, B J
DOUOHERTY, D J
DDUOHERTY, a j
80071 6O49&*
8QQ7UHH9E)*
60071(10304*
800714O313*
6007230 52V*
CONTRACT
CON Tit ACT
CONTRACT
CONTRACT
CONTRACT
DHAOOKETTE, K a
DHAKE.O A
DRAPER, E L
DRAPER, E L,
DRAPER, C t.
SO 07020 760
GO 07030 3A6
8007290.124
G007I604V5
D0072205'7fl
27-47
PR
pn
HUREO
30-433 fl
DHA8TER, J J
DREY. L A
DREY. K
DREY. K
DREY. K
B-007100ia2
0007100'I23
B0070QOP26
BOO/2I0145
B007220336
HCCOD
HEOOD
50-320 II
•10-BS02
30-10 0
DRISKILL.D D
DRISKILL. D 0
DRQMCRICK.A IJ
DROMERICK.A IJ
DUORV.N E
B0072Q0137U
B0071 80009*
D007090033
G0072Q0006
B007I7031D*
50-49B Q
50-49B Q
30-337 1'
50-311 l>
70-923
DUCE.S U
DUCKWORTH, J P
DucKwoarn. j p
DVCKWORTH. J P
DUHHER, 0 M
B0072170217
00072 ID 020
B007090246
B007230-14I
00072 1O23B*
50~H54 P
50-201 Q
30-201 Q
50-2QI Q
CONTRACT
DUNBAR, J
DUNOAN, K H
DUNQrtN, K W
DUNN, C N
DUNN, C N
B007100192*t
B007H01(.B
B007160176
0006230660
B007230130H
30-B37 P
PR
PR
30-334 O
90-034 0
DUNM.C M
DUNN,C N,
DUNNrC N
DUNN,C w
IJUMM, C M
SO 070 1 03-95
B007ai001l
B00?oaoa76
Boo7oaooao
B0070801B6
30-334 P
50-334 O
30-334 O
50-334 P
90-334 P
DUMN, C, N
DUNN, C N
DUNN, c N
DUNN, c, N
DUNN,B D
B007000'ia4
60071 30613
6B071&0364-
0007160694*
80071 70371 »
50-334 0
30-334 O
50-334 P
90-334 0
30-2BO n
DUNN, C N
DUNN. C N
DUMN^C N
DUNN, C N,
DUNN, c N
8007160400
0007160535
B007I6059B
B0071 60617
60071 50403
30-334 P ,
30-334 P i
30-334 Q ;
50-3341 P ,
50-331 ' .
432
PERSONAL AUTHOR INDEX
AUTHOR
ACCESSION
NUMflEft
SUBJECT
CATEGORY
DUNN.C H
DUNW.C M
DUNN. C N
DUNN. C H
DUNN.C H
B007150S67
6007190118
B007220S06
B007 150180
80072205BS
50-334 Q
50-334 R
90-334 3
50-334 P
50-334 Q
DUNN.C H
DUNN, C N
DLJNM.C N
DUNN. C N
DUNNING-. D E
B007170546
8007350294
9007290643
8007390680
B00709O37 1
50-334 0
50-334 0
50-334 P
50-334 0
HUREO
DURKIN. J A
DURR.J P
DURR.J P
DURF1.J P
DUflR , J P
B00711O507
B007020225*
00071 70645»
B007320289"
S007170257*
PR
50-334 0
90-3B7 0
50-317 0
30-3B7 Q
DUTTONi D
DUTTDN, D
DUTTON, D
DUVALL, D D
DWDRAK. J A
BOO7110521*
80070202 IB
3007320575
S0070B0191
8007240394
50-434 Q
SO-424 0
50-424 0
30-354 A
KUHEO
DVER.O H
EADIE,0
EADIE.Q 0
EAD1C.O 0
EADIE.O 0
B007 140699
B00707OIS5
B007 100062
B007330161
B007230279
PR
UABTE MOT
40-8300
40-8714
40-B300
EADIE.O 0
EADJE.O
EAQLETON.T F
EAHLE.Y, A F
EARLY, P J
0007250054
BOO 7330720
aOO7110571*
3007090306
S0071BOH1
40-1341
HASTE HOT
50-4B2 U
50-322 0
50-286 0
EAST , D
EASTER, J-H
EDER&OLE. J C
EBNETER, B D
EBNETEHrB- D
Q00717OI06
BO 07020338"
B007210479
8007 1706 11 #
6007210309*
40-0745
Stite Prog
ACRS
50-286 0
90-354 0
EBNETER , 8 D
EBNETER, 8 D
EBNETER, S D
ECKERMAN.K F
ECKHARDT. V
B007250270"
B0072B0080*
80073 10063"
B007030373
B0071 10278*
90-293 0
50-333 0
90-277 Q
UUREQ
COMMISSION
ECKKARDT.J H
ECKHARDT, 0 H
ECKHARDT. B
EDDLEMAN
EDEL3TEIN, B
80071 70939*
a00731037D»
S 007300365
3007100123
8007010577
90-361 Q
30-52B 0
SO-498 U
PRM
XPORTLIC
E&EL8TEIH, B
ECEL8T6IM, B
EDEL3TEIM, B
EDGEHPRTH.P J
EDGEWOflTH,P J
BO 07020 01 4
BO 07030 063
B0071A0403
B007030337
B&07070032
XPDHTLIC
XPORTLIC
XPORTLIC
CONTRACT
CONTRACT
EDOEWORTH.P J
EOOEHORTH, P J
EOQEHORmP J
EDMOND50M L R
EDHARDS. & U
8007070037
B0070900B4
8007 140636
S0072B-0-327*
B007110339
CONTRACT
CONTRACT
CONTRACT
CONTRACT
PRM
EDUARDB, D U
EECKHOUT, A
EOAN, 0 R
EtiRENSPEROEfi.W
EHREMEPEROER. U
B007300009
B00731O318*
B007280404*
e0070S0344
B007290774
PR
XPORTLIC
90-206 B
90-4H4 H
90-434 F
EICH. E
EICHHQHH, M H
EICHHQHH.W H
EISENHUT.D 0
EISENHUT.D 0
6007320479*
S0070204S3
9007020453
0006090165
a00613D>i23
90-247 R
30-367 0
50-367 0
50-320 P
SO-320 P
EISENHUT, D 0
CI8ENHUT, D O.
EISENHUT, D 0
EISENHUr, D 0
EISENHUT, D 0
B004230110
8006130063
8007020396
B007 160471
80071B0479*
50-273 A
30-330 F
NUREO
TOPREP
TOPREP
EISENKUT, D 0
EISENHUT. D fl
EISENHUT, D O
EI9ENHVfr, D 0
EISENHUT, D 0
8007330099
BOOT 180518
B0072 10032
8007020209
80070201 S3
50-320 P
50-344 0
50-323 11
90-523 A
50-10 H
EISENHUr. D 0
EISENHUT, D 0
EI3ENH4JT, D 0
EISENm/Ti D 6
EISENHUr, D O,
B007 170323
8007 18)0033
80073 B0079
8007310243
8007140231
50-10 0
50-10 0
OSS
30-330 0
90-409 H
EISENHUr, D C
EISENHUr, D 6
EIBENHJTrD O
EI8ENHUT, D O
EISENHUT, D O
8007170309
8007230001
8007240141
B007K40479*
8007250001
50-2B9 P
90-279 A
50-389 P
FOIft
50-320 P
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
EISENHUT.D 0
800717055S
90-334
F
EISENHUT.D 0
8007160190
50-367
F
EISENHUT- D Q
8007280183
50-10
D
EISENHUT.D 0
8007230198
50-369
A
EISENHUT.D 0
8007310022
50-10
H
EISENHUT.D 0
B00731002S*
50-10
H
EIBENHUt.D 0
B0072300B3
50-346
F
EISENHUTiD 0
6007230070
30-269
F
EIHENHUr, D 0
B007230093
3O-312
F
ElSENHUTiD 0
6007330104
50-321
F
EI9CNHUT.D 0
8007230126
50-377
F
EISENHUT.D 0
B007230184
50-303
r
EISENHJTrD 0
8007230208
90-273
A
EI3ENHUT.D 0
8007230616
SO-311
p
EI3ENHUT, D 0
8007230163
50-364
A
EISENHUT.D Q
B007300061
50-339
F
EISENHUT.D 0
BQ073103H8
50-39S
H
CISENHUTpD 0
B007290337
30-239
Q
EIBENHUTD 0
600730027S
30-277
8
EKLUND. 8
8007020674*
COMMISSION
ELIN, J 0
8007240314*
30-344
Q
ELLER8HAU.L E
8007300 I 9B*
OA999
ELLEflEHAU, L E
B007250109*
OA999
ELLEHBHAU.L E
B007I60S07*
OA999
ELLERSHAU.L E
BOO 730031 4*
OA999
ELLIOTT, E D
8007070092
PR
ELLIS, J
0007090327
30-449
0
ELLIS, J
B0073003A6
50-449
&
ELLIS, J
8007310123
30-443
0
ELL IB, J
8007220546
30-445
0
ELLIS, J
8007220959
50-443
0
EMRATH.fi H
80073a0574«
30-327
a
ENOELKENiR H
80071 40E04
30-133
Q
ENCELKEHrR H
8007140587
30-397
0
ENOELKEN, R H
B007020234
50-344
0
ENOELKEN, R H
B007020240
50-312
Q
ENCELKEN,R H
0007020242
30-133
Q
ENCELKEN.R H
8007020246
5Q-S06
0
ENQELKEN, R H
0007010016
90-528
0
ENOELKEN, R H
B007220333
30-333
Q
ENGELKEM.R H
6007220337
30-133
Q
ENQELKEN, R H
BOD7220239
SO-514
a
Et40ELKEN,lt H
8007220341
50-344
a
EMOELKEN.H H
8007220244
50-522
Q
ENQELKEN, H H
8007220249
30-206
a
EHOELKEN.R H
8007320290
30-312
Q
ENOELKEN, R H
8007220293
SO-397
a
ENOELKEN, R H
8007140412
30-133
a
ENOELKEN, R H
8007140414
30-397
a
ENCELKEN.R H
B00714041B
30-522
a
ENGELKEN.R H
6007390000
90-928
0
ENGELKEMiR H
60072900B6
90-279
a
ENSELKEN, R H
8007290086
50-361
Q
CNOELKEN, R H
8007390090
30-397
Q
ENOELKEN, n H
8007030005
70-25
ENOELKEN, R H
8007030008
70-1287
ENQELKEN, ft H
B007030009
70-734
ENOELKEN, R H
8007030010
90-206
a
ENGELKEN, H tl
8007030014
50-312
a
ENGELKEMiR H
8007030017
50-279
Q
ENQELKEN.R H
8007030018
50-344
Q
ENOELKEN, R H
B007030466
90-397
a
EMOELKEN.R H
B007020470
30-344
a
ENOELKEN, R H
6007030474
30-133
a
EMQELKEN'R H
8007030477
30-528
Q
ENOELKEN, R H
80070204 7B
90-206
Q
ENOELKEN, R H
80070204BO
30-312
Q
ENOELKEN, R H
8007180247
30-243
a
ENOELKEN.fi H
80071B0291
50-289
Q
ENQELKEN, R H
8007180332
30-112
0
EHOELKEN.R H
8007180354
50-37
Q
ENOELKEN, R H
B0071B0299
90-324
Q
ENOELKEN, R, H
B007 180261
50-143
Q
ENGELKCN, R H
6007180263
30-433
Q
ENCELKEM.R H
8007100266
50-326
Q
ENGELKEN.R H
8007180269
50-139
Q
ENOELKEN, R K
0007100272
50-220
a
ENOELKEN, R H
0007180274
30-89
a
ENOELKEN, R H
8007180278
50-187
0
ENOELKEN, R H
B0071B0281
30-375
0
ENOELKEN, R H
6007180363
70-964
ENOELKEN, R H
BOO? 100286
50-328
a
ENQELKEN, R H
00071B0387
SO-133
Q
ENOELKEN, R H
B007I80290
50-344
a
ENOELKEHiR H
8007180392
90-206
0
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
ENCELKEN.R H
8007 100295
30-312 Q ,
ENQELKENiR H
80071 80299
50-397 Q
ENQELKEN, R H
S007 190304
70-1257
ENQELKEN, H H
8007 1 S030S
30-70 a
ENOELKEN, H H
80072303B1
SO-32B a
ENQELKEN, R H
8007230389
50-275 a
ENQELKEN, R H
0007230387
00-133 Q
ENQELKEN. R H
8007230390
30-344 Q
ENOELKEN, R hi
0007230393
50-361 (1
ENQELKEN, R H
8007230374
30-206 Q
ENGELKEN.R H
800723039-?
50-312 a
ENOELKEN, R H
B007230401
30-397 Q
ENGELMAN, Q P
8007220063
RES
ENQEL.R E
80071 7O374*
50-260 P
ENOELKEN, R H
B007200143
30-341 Q
ENQELKEN, R H
B0073 10437*
30-344 B
ENOELKEN, R H
8007310447
30-397 A
ENQEL, R E
3007230313
TOPREP
ENQLEHART, R W
8007220111*
WASTE MOT
ENOLEHART.R W
8007220036*
WASTE MOT
EN8LE.N J
fl007300590«t
CONTRACT
ERB.C H
B007 170633-
30-329 Q
ERH, C A
B0071 30023*
50-483 Q
ERICK60N, R A
B007230Q53*
FOIA
ERIC80N, D M
8007020011
RES
ERNST. H L
8007310113
NUREO
ESKRIDOErH E
B007140613
71-6294
ESSIO. T H
B007 100099*
30-346 Q
ESSIO, T K
80072804S7-
50-07 Q
ESBIQ.T H
8007230276*
30-295 Q
ETHERIDOE, M R
B007 140037*
OA999
ETHEflEDOE, L
S0072 30072
FOIA
EURY. L W
80072 10022
30-261 Q
EVANS, R D
6007100030
PR
EVANS, V R
0007160345
50-317 F
EVANS, V R
B0072804BI
30-317 F
EVDOKIHOFF, V N
B007090416
REOOD
FABRIKANT.R
80072B0636*
30-448 M
FAHRNER, W J
B007070098*
50-341 B
FAHRNEfl. H J
8007210136*
30-341 S
FAHRNER, H J
8007140326
30-341 8
FAHRNER, W J
0007 I 70406
30-341 S
FAHRNER, W J
8007230943
30-341 B
FA1RHURST, C
B007030200
PR
FAIROBENT. J £
B0071 70362
50-320 H
FAIRTILE, M B
8007240037
30-302 P
FALK. K H
B0072B0477
30-301 0
FALK. K M
3007230607
90-246 0
FALK, It H
B0073 10373
30-266 H
FANTLE, M
B007140227K
30-409 H
FAR IS, H M
800721O486*
90-413 A
FARLEY, A F
8007030033
30-322 0
FARLEY, A T
8007030053
30-322 0
FARNAN. J ,
8007310280
FOIA
FARNELL, A 8
8007090043
50-329 0
FARNELL, A B
B007090045
30-329 0
FARNELL. A 8
B007 140020
50-329 0
FARNELL, A 8
B0071 40030
90-329 0
FAROOQUI.S H
8007250393*
30-397 A
FAROQQUl.S M
8007230398*
30-397 A
FA9ANQ, A
3007250207
30-320 B
FA8ANO, A
8007230223
50-209 B
FASANQ, A
B0072502Q1
50-320 B
FA3ANO, A
8007230214
50-320 S
FASANCJ. A
B007250231
SO-320 B
FASANQ, A
8007250237
30-320 8
FASANO, A N
8007230218
50-320 B
FAULKENBEHRV, B
8004240286
30-312 S
FAULKENBERRY, B
8004240300
50-206 S
FAULKENBERHY, B
8007170579*
30-206 Q
FAULKENBERRY, B
8007220337*
50-73 0
FAULKENBERflV, B
6007210107*
30-224 Q
FAULKENDERRY, B
8007240420*
30-312 Q
FAULKENBERRY. D
0007240273*
50-206 Q
FAULKENBERRY, B
B00731Q3Q1*
3Q-31H Q
FAULKENBERRY, B
B007300343*
30-206 0
FAUST, R
8007170071*
30-317 P
FAY, C W
0007020340
PR
FAY.C W
0007140939
PR
FAY.C W
8007010030
30-266 0
FAY, C W
8007010062
30-266 Q
FAY. C U
B007 160757
30-266 Q
FAY, C H
8007010043
30-266 Q
FAY, C H
BOO 70 10409
30-266 8
FAY.C W
8007010420*
90-266 S
PERSONAL AUTHOR INDEX
433
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
FAY, C M
S007O903B1
50-301
S
FAY. C H
8007090334*
50-301
S
FAY, C H
8007 1 10342
50-301
3
FAY. C 14
60071 10349*
50-301
S
FAY, C W
8007300033
PR
FAY.C H
8007090230
50-301
'P
FAY.C H
80071 10333
30-246
S
FAY, C H
60071 10340*
50-244
S
FAY.C 14
B0071 10353
50-301
S
FAY.C VJ
B0071 10357*
30-301
S
FAY, C M
00071 90448
50-266
P
FAY, C H
B0071904S2
50-266
P
FAY.C U
B0071 70526
50-866
Q
FAY, C H
9007150653
50-246
P
FAY.C W
B007230071
50-244
0
FAY, C U
8007 1 506 1 B»
50-244
R
FAY.C H
8007210408
50-264
P
FAY.C U
B007240342
50-266
0
FAY.C W
B007150610
50-266
R
FAY, C U
B007300430
30-301
Q
FAY, C U
8007300440
50-266
F
FAY, C W
B007300456
30-266
0
FEE, U F
B007300331*
50-213
P
FEE, U F
800721 0387
50-24S
P
FEE, 14 F
8007210233
30-336
P
FEE, U F
8007220457
30-245
P
FEIERABEND, C D
B00707004U
50-2B2
Q
FEIERADEND. C D
80072^)02 10*
30-282
0
FEIL, R A
8007180561"
50-410
Q
FEIL. R
B007210545*
30-483
Q
FEIT. R
8007220041
REVIE14
GRP
FELTON, J H
80070202B4
FOIA
FELTON. J H
8007130756
FOIA
FELTON. J H
8007170264
70-IB69
FELTON. J H
8007070026
50-314
D
FELTON, J H
B0072B0279*
FOIA
FELTON, J H
8006300220
30-320
H
PEL TON, J M
B007010070
50-249
P
FELTQN. J H
B007030Q04
70-2478
FELTQN. J H
S007030033
FOIA
FELTON. J H
S0071 100O9
90-330
J
FELTON. J M
B007290235
PR
FELTON, J M
9007020122
FOIA
FELTON. J M
B007020I32
FOIft
FELTON, J M
9007020460
FOIA
FELTGN, J M
8007030064
FQIA
PEL TON, J, H
8007030331
FQIA
FELTON, J H
800711017B
30-320
P
FELTONrJ M
8007140312
FOIA
FELTON, J M
8007140277
FOIA
FELTON, J M
B0071000OB
70-143
FELTON, J M
80071 IOOO4
70-143
FELTON, J M
B007U0004
FOIA
FELTON, J H
9007140239
FOIA
FELTON, J H
B0071 40226
FOIA
FELTON, J H
B007140616
50-320
H
FELTON, J H
B0071 40233
30-320
H
FELTON, J H
B007140635
50-458
H
FGLTON, J M
B007140664
FOIA
FELTON, J H
B0071 10139
50-302
H
FELTON, J H
B0071 40245
FOIA
FELTON, J 11
8007110149
FOIA
FELTOH, J H
B007140645
FOIA
FELTON, J H
8007190766
FOIA
FELTON, J H
8007140471
FOIA
FELTON. J tl
8007140511
30-320
H
FELTQN, J H
8007170197
FOIA
FELTON, J M
S0071B009B
BO-302
H
FELTON, J H
8007230207
FOIA
FELTON, J H
8007220263
40-299
FELTON, J 11
B0079S0323
50-320
P
FELTON, J (1
8007220243
70-143
FELTON, J M
B007230224
FOIA
FELTON. J M
B007230332
50-302
H
FELTON, J M
8007230240
SO-466
0
FELTON, J M
B007230250
FOIA
FELTON. J H
B007S50083
FOIA
FELTON, J 11
B0072B0272
FOIA
FELTON, J M
8007300032
70-143
FELTON, J (1
9007230559
50-3BO
U
FELTON, J H
9007230644
50-10
D
FELTON, J 11
B007240193
FOIA
FELTON, J H
9007240431
FOIA
FELTON, J 11
B0072B02B3
FQIA
FELTDN, J H
8007280290
FQIA
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
FELTON, J It
8007240183
FQIA
FELTOtJr J M
BOQ7240474
50-443 H
FELTGN.J M
SOO72B0197
FOIft
FELTOH. J M
8007240453
FOIA
FELTOH. J H
8007250022
FDIA
FELTON, J H
6007350069
FOIA
FELTON, J M
B0072B0267
FdlA
FELTQN, J H
B0073104B1
70-2479
FELTON, J 11
8007310544
FQIft
FELTOH, J H
8007310232
FOIA
FELTOH, J 11
8007310276
FOIA
FELTOH, J 11
0007310493
FOIA
FELTQM, J 11
B0073J02B5
50-320 P
FELTZ.D E
B00729047S*
ao-iae R
FERGUSON. R
BO 07240 1BS»
FOtA
FERGUSON, J H
8007030131
90-280 P
FERQUSDN, J H
S0070B0069
50-339 P
FERGUSON, U J
8007150737
5-0-523 A
FERGUSON. J H
BO 07 11 0364
50-339 P
FERGUSON. J H
B007I4O393
30-338 P
FERNOS, Q
BOQ7I605B1
50-376 0
FERNOS, 0
BO 07230791
50-376 0
FERRARELLD. S
BO 07230973"
50-303 0
FEUSS, J V
30O7i 70377*
Stall Prog
FIDELL. E R
800714061"?
30-320 H
FIELDER, J
8007010516
50-259 J
FIELDER, J
90070B026I
50-364 J
FIELDER, J
8007310435
50-302 J
FIELDER, J
8007310436
50-259 J
FIELDS, K
8007310254,
TOPREP
FIENO, D
8007010103*
50-349 P
FILKIHS, D
80072B0639*
50-244 8
FINCKE. J R
8007290191
RES
FINFRQCK. I R
B007UQ023"
7O-1333
FINFROCK, I R
B007QI046Q
50-219 P
FINFROCK, I R
9007020377
3O-219 Q
FINFROCK, I R
80Q7O30216
5D-219 P
FINFROCK, I H
8007070299
50-219 B
riNFRQCK, I R
80071 10370
50-219 S
FINFROCK, I R
9007110375
30-219 8
F1NFRQCK, I R
B007210Q42
50-219 0
FlNFRdCK, I R
B007O90262
50-219 F
FINFROCK, I R
8007090259
50-219 0
FINFRQCK, I R
8007250309
50-219 0
FINFRDCK, t R
0007130703
50-219 a
FINFRQCK. I R
6007160500
30-219 P
FINFRQCK, I R
B007 170279
50-219 P
FINFRQCK, I R
BOO7iaoi09
50-219 P
FINFROCK, I R
B00710Q4I5*
50-219 P
FINFHQCK, I R
6007290134
50-319 P
FINKEL, ft
BOO? 2 10240*
50-332 Q
FINKEL, A E
BQO7230270*
5O-S93 Q
FINKEL. ft E
BOQ72BOOaO*
50-333 Q
FINKEL, A
BOQ731QOA3*
50-277 Q
FINLEV. A 0
Q007290973*
so-as* a
FINLEY, N C
8007 2902 &1
NUREO
FIORELLI.O
9006300114
50-329 Q
FIQRELLI.Q
8007140522
50-483 Oj
FIORELLI.O
80071 101 53
so—lit a
FIQUELLI.Q
Q007O901 34
90-440 0
FIORELLI.O
6007G90176
30-440 Q
FIQRELLI.O
8007110477
BO-35B 0
FIORELLI.O
BOQ7150017
50-483 fl
FIQS.ELLI.k3
B00716Q725
50-440 a
FIQRELLI.O
8007180508
30-454 a
FIORELLI.O
80071501 13
30-454 a
FIORELLI.O
8007 0200 Bl
50-341 a
F10HELLI.Q
8007160469
SO-S46 Q
F10HELLI.O
9007230002
50-454 fl
FIQRELLI.Q
8007140751
90-461 a
FIORELLI.O
8007230072
50-3sa a
FIQHELLl.Q
8007020027
50-546 a
FIQRELLI.O
9007180495
30-440 S
FIQRELLI.G
8007030324
30-359 3
FIORELLI.O
8007070095
30-341 a
FIQRELLI.O
8007230059
50-341 fl
FlOilELLI.Q
8007230402
30-329 Q
FIQRELLI.O
B007HQ228
90-461 a
FIORELLI.Q
6007110338
50-359 B
FIORELLI.O
8007230327
30-346 0.
FIORELLI.O
6007330349
30-304 ft
FIORELLI.O
B007230693
5O-373 Q
FIORELLI.O
6007230704
50-546 Q
FIORELLI.O
S007O701W
50-3E9 S
FIORELLI.O
6007230266
50-373 0
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
FIORELLI.O
FtORELLI.O
FrDRELLl.fl
FIORELLI.O
FIOHELLI.O
B00723079rt
Q0073 10363
8007140190
BOQ71-W202
B0071 50029
SO-293 0
50-461 Q
30-483 B
90-461 Q
50-33B B
FIORELLI.O
FIORELLI.O
FIQF1ELLKQ
FIORELLI, 0
FltJftELLI, 1
B0071S0032
S0072J0316
80073001 51
Q-0 07300 16O
8007140470
90-329 B
30-461 0
30-483 0
90-403 0
50-341 <1
FIDRELLI.O
FIORELLI. 0
FIORELLI.O
F I QUELL I, 0
FIORELLI, 0
B007300132
B00730013B
8007300300
8007150002
8007 170 186
90-331 0
50-451 0
30-339 0
SO-403 fl
30-306 0
F I ORELL I , 0
F I QUELL 1 , 0
F I ORELL 1 . 0
flDRELLI.Q
F I ORELL I , 0
8007170625
BOO 731 03 04
60071704'9B
BOO 7 170520
B0072I012E9
30-329 Q
30-266 0
30-341 B
90-337 8
30-3 11 G
FIORELLI, 0
FIORGLLI.O
FIORELLI.O
FIORELLI.O
FIORELLI, 0
B0072100OS
3007210012
8007210021
8007B10023
8007210031
30-34 1 S
30-346 3
5Q-B4&. 8
50-546 S
30-54A B
FIORELLI, 0
FIORGLLI.O
FIORELLI, fl
FIORELLI.O
FIORELLI.O
B0072100S4
8007230613
8007130436
00071 BOS 11
8007180336
50-346 B
SO-346 8
SO-4B3 Q
30-461 B
30-346 B
FIOJIELLI.O
FIOHELLI, 0
FIOflELLI.O
FIORELLI.O
F10RELH.O
B007130S03
60071 3058 &
H0071BOSB2
8007240319
9007180545
SO-35B H
30-440 0
SO-440 0
30-946 B
50-440 8
FIORELLI, 0
FIORELLI.O
FIORELLI.O
FISCHER, K L
FISH. R F
Q007B102B3
8007230313
6007240340
8007580406
B007130130"
30-373 Q
30-44O Q
90-436 Q
30-206 P
30-344 Q
FIBH, R
FI6H, R
FISHER, U L
FIStlER, U L
FISHER. C R
B007B30203
Q007B3016D
8007 14004 I*
6007100009*
9007020203
30-344 8
90-312 S
70-B
30-409 Q
pn
FISHER. W L
FISHER, W L
FISHEIl.H L
FISHER, H L
FISHER, M F
8007240009*
800717031Q*
8007I4047U
000731 051 S»
80073 100DS
S0-t53 Q
70-928
80-346 fl
SO-S9S Q
XPORTL1C
FISSE. L fi
FITZPATRICK, T
FITZBIMMDNa, T
FLANDERS, U
FLEGER, S
80070204 3B
000716oa9B«
BQQ72401S-1
B0071103B9*
0007090166*
PR
CQIIMIBBION
71-9132
30-309 R
NUREO
FLEOER. B
FLEI&CHAKEH, D
FLEJSCHAKER, D
FLCISCHAKER, B
FLETSCHAKER, D
BOO 70701 67-"
0007160410
BOQ7JOOI-JO
800723050B
8007230508
NUREO
PRM
30-275 0
50-375 0
SQ-275 0
FLEIBCHAKEft, D
FLEISCHAKER, 1)
FLITTQN, V E
FLOWERS, F D
FLOYD. B 0
Q00730007A
8007300096
8007280174
800707006.7
8007220396 u
50-375 0
BO-27B 0
RES
PR
50-331 P
FLOYD, 8 0
FLYNM, M J
FLYNM, M J
FLYNM, M J
I-LYNW, M j
8007230484*
8007020730
0007030336
6007110935
Q007H10317
50-331 P
CONTRACT
COII1TRACT
CONTRACT
CONTRACT
FLVNN.H J
FLYNM, M J
FLVWt, tt J
FLVNN, M J
FLYNN.M J
6007140200
8007170213
8007100521
8007210103
8007210122
CONTRACT
CONTRACT
CONTRACT
CONTRACT
CONTRACT
FLVNM, M J
FLYNM, M J
FLVNM, M J
FLVNM, M J
FLYNM, J, D
B007210I94
8007140513
8007170133
8007300579
QD07K20280
CONTRACT
CONTRACT
CONTRACT
CONTRACT
50-39B A
FOBES, R L
FCJ9ES. R L
FOQO. 11
FO.NNER, R L
FONNER.R U
8007220484*
Q007S906I6*
6007110299
800721 0283
8007100446*
30-2BS B
50-293 S
30-288 K
4O-QS02
4.0-9302
434
PERSONAL AUTHOR INDEX
AUTHOR
ACCESS ION
NUMBER
SUBJECT
CATEGORY
FOMTECILL.ft,H M
FONTECILLA. H
FORD, U H
FOHD.C H
Fons.n H
600711 0496
80071 C0246«
B007II0318
B007I00113
0007330165
FOIA
FOIA
50-546 U
RECGD
f!ES
FOSTER, U E
FOSTER, H E
FOSTER, U E
FOSTER, J
FOSTER, S C
000701O171*
B0072S0594*
B00722020B»
0007110572
BOQ71 50479
OA999
OA999
OA999
CONTRACT
30- 1 55 J
FDX.C J
FdX.D F
FRANCIS, E
FHAIMCIS, F E
FRANCIS, F E
8007010336
S007I&0126*
BO 07030226
S007 150459
BQ0715O45B
TQPREP
QA999
40-8745
30-4B4 G
50-484 G
FRANCIS, F E
FRANCE- B
FRANKE, B
FRANTZ, 3 P
FREDERICK, £ J
0007150459
8007020554*
B0071 50042
B007020453
Q007290241
50-464 C
SO-320 G
50-320 P
30-367 G
RES
FREEBURN.H R
FREE KAN, R
FREY. D 0
FREY, J H
FRIES. B A
S0070B02B5*
S0072eOi91*
3007010033*
900717041811
9007160446
TQPHEP
50-409 G
50-546 H
COMMISSION
REGCD
FRIES.B A
FRIES,R S
FROST, S R
FROST.S R
FRVLIIJO.R
B007100I33
BO 07230 100
B007100199
8007230473
B007150909
REGGD
40-7402
50-259 P
30-255 P
50-272 0
FULLER, J K
FULLER, F. K.
FURBUSH.M H
FURR-B J
FUHfi, B J
H007220439
8007260645
B 007 160358
B 007 150 097*
6007020067
PR
90-267 0
50-133 G
90-261 0
90-261 0
FUliR, B J
FURft, B J
FUHK, B J
FUim, B J
RJRrt, B J
6007100031
B007220234
6007220260
B007170516
6007220237
50-261 0
30-261 Q
50-324 0
50-324 Q
30-261 Q
FURR, B J
FURR. B J
FURR, B J
FURR, B J
FURR, B J
600724 01S9
8007310449
8007260104
3007280111
B0072S0296
50-324 Q
90-324 0
50-260 Q
90-334 Q
50-324 Q
FURR, B J
FUHR, B J
FURR, B J
GABRIEL, E
GADLER.S J
B007300561
80073 1 O206
80073 1 0306
B00703015B
90072! 01 50
30-324 0
90-324 0
50-324 0
PR
40-1341
OA5LIARDD, T E
OA5NE,Q R
CAHM, J M
CAHM, J M
QfMH, J U
30072 10307»
B0071B0467*
8007010346*
B00708O262*
6007080279*
50-277 Q
MISC
50-267 R
50-267 S
30-267 S
OAHM, J M
OAHH, J U
OAHM. J U
GAUM. J M
OAHMrJ H
00070304S9*
Q0070 10506*
6007090213"
6007090304"
B0070B0409*
50-267 B
80-267 B
50-267 B
50-267 S
50-267 R
QAHH.J M
OAHM, J W
OAHM-J W
GAHM. J M
CAJIC, Z
6007100176*
S007230554*
B007230S55*
300723O539*
B0071 60672*
50-267 S
50-267 8
30-267 B
50-267 S
30-304 S
GALftZEN, T
OALLAGHEH, J U
GALLAGHER, J It
(JALLAGHEft, E J
GALLAGHER, E J
B007290703
B007230722*
6007030041*
B0071 10160*
B007O901S9*
50-484 G
30-277 0
50-277 0
50-461 Q
50-440 0
AUTHOR
ACCESS I ON
NUMBER
SUBJECT
CATEGORY
GAMHILL.y P
OANLEY, 0 E
CARDER. S L
GARCIA, P J
GARCIA. P
8007170679
80071B0066"
8007S20047
B0071 50076
0007100449
MISC
70-371
RES
40-3493
40-1162
GARCIA, P J
OARCIA,P J
GARCIA, P J
GARCIA, P J
GARNER, P L
B0071 40693
0007100088
6007390268
8007230713
800724D459
40-4492
40-1162
40-1162
40-9452
NUflEG
GARNER. D
GARHAHV, J J
CAfinCTT.E G
GARFUTY, J H
GARRITY. J H
8007180229
B0072403Q1?*
B00623037B
60071 10306
8007280601
50-316 P
70-2133
50-309 H
50-309 R
50-309 R
QARRISQN.W A
GARY, R J
GARY.R J
GARY, ft J
GARV.R J
80073 10269»
B007 1 40502*
B007170196
B007110598
8007140455
FOIA
50-449 Q
90-443 Q
30-443 0
50-443 0
GARY. R J
GARY.H J
GARY, F 8
GARY.H J
GARY, R J
6007000062
B0070B0282
6007300037
B0071B0366
B007310332
50-446 S
30-445 F
PR
90-443 A
50-445 8
OARY.R J
GASCHLSfl.J A
QASSEH.E R
GA3TON.H D
GAY,N R
8007210478
80072906S9
8007180193*
80071 40473*
8007010060*
30-445 A
30-267 J
CONTRACT
30-269 0
40-2674
GAY,N R
QEHR. A C
CEHR.A C
GENOLER.M U
GECRQIOU, H S
B0070 10067*
6007 100403
8007300106
0007030305
$007300419
40-2674
50-279 0
50-52B G
50-322 A
30-275 G
OEOROiaU. B S
GEROI.B J
GERSTNEH.M C
GERSTNER.H C
OERTH.O E
BOO 7250429
B0070203U5
G007H0333*
00072105211
8GD71 10534
50-275 0
Pfl
50-461 Q
90-461 Q
PR
GERUBKY, T H
QESSELL, T F
QIDDONS, T B
GIBBS, D C
GIDHS.D C
B0071001B6*
BOQ73I0231
B0071B0275*
8007100003
B0072B0032
50-320 P
IJUREO
30-393 Q
PR
PR
GIBBS, H E
OIBBS.M E
GIBSON. A F
GIBSON, A F
GIBBON, J D
8007210446
8007300421
800707O019*
8007030370*
8Q070203S7
90-233 0
30-339 G
70-143
70-IS01
PR
OIEDT.J fl
GILBERT, L D
GILBERTS. D E
GILBERT, L B
GILBERTS, B E
B0072S0600
B007 100346*
8007170194*
8007110234*
80072 10S09»
40-1162
50-49B Q
90-306 Q
50-445 Q
30-263 0
GILBERTS, D E
GILBERTS, D E
GILBERTS, D E,
GILBERTS, D E
GILBERTS, D E
0007010260
B0070 10267
B0070 10949
B007I60707
8007140192*
50-202 Q
SO-2B2 Q
50-2B2 Q
30-282 0
50-282 Q
GILBERT. R E
GILBERTS, D E
GILBERTS, D E
GILBERTS. D E
GILBERTS, D E
8007880730*
B007020162
B0072101B2
8007210132
000731 0106
50-402 Q
50-263 O
30-263 a
30-263 Q
30-202 a
GILBERTS, D E
GILBERTS. D £
GILBERTS, D E
GILBERTS, D E
GILBERTS, D E
0007250363
8007830077
00072B0057
8007220090
8007220342
50-263 0.
90-262 0
30-263 OJ
30-282 OJ
30-282 0)
GILBERTS, D G
GILBERTS, D E
OILINBKY.V
GILL, 5 A
GILLELAND, J E
5007230211
B007290S41
B007280729*
8007110014
B007300167
50-282 Q
90-263 d
COMMISSION
71-221
50-43Q B
00071003B1*
8007100410»
B007010I23*
B007070003»
8007140073*
7Q-US1
70-1201
70-143
70-2478
70-143
8007150107*
8007140527*
8007030298*
6007180601
8007280175
90-261 0
70-143
70-143
40-B5B4
40-BfiBl
AUTHOH
ACCESSION
NUMBER
SUBJECT
CATEOORY
QILLESPIE, F P
8007110113*
50-333
Q
QILLESPICiF P
0007100093*
30-261
Q
GILLE6PIE, F P
0007290393*
50-364
0
QILLESPIE, F P
8007090170"
50-369
0
OILLEBPIE. F P
00071 400B6*
70-143
QILLESPIE, F P
0007140555*
50-297
Q
OILLESPIE, F P
0007160787*
70-1113
OILLEN. D U
8007230131
40-2259
QILLEBPIE, F P
60071i076H>
50-338
0
QILLETT. W T
80071 S0547»
30-313
R
QILLETT, W T
0007150561*
30-316
R
QILLESPIE.F P
8007180316*
70-143
OILLEN, D M
8007230667
40-B728
OILLEN. D
80072306 73
40-068 1
OILLEN. D
00072306SO
4Q-B3B4
OILLEN, D H
0007230713
40-fl432
QILLILAND, D L
B0072BOS77
30-70
P
01LLILAND, D L
0007200599
TOPREP
OIUUILAND, D L
8007300637
30-70
P
OILLOT, R
8007230201
WUREO
OILMAN, D W
0007090234
90-206
P
QINSBEHOi T
Q007 190066
REB
CINBBERO. T
B0070200B3
REB
OINSBERQ. T
8007210011
REB
OINBBURO, R
8007200537
30-10
D
OIROUX,E J
0007170236
30-510
S
QIROUX.E J
8007170247
30-319
B
OIUFFRE. M S
9007 100 188*
PR
OIVEL, M
H007230237
30-302
H
OLENN, J E
0003020378
HE
QLiaSMEYER.J A
8007170311
NUREO
QODDARD, R J
80070 10331
30-237
0
GOGOL. E
8007230369
90-10
B
GOLDBERG, S C
8007010131
30-399
0
GOLDBERG. S C
00070 7O 104
50-320
0
OOLDBERQrS C
8007070094
30-25O
0
GOLDBERG, S C
B007I70357
90-320
Q
ODLDBERO.fi
8007140073
30-346
H
QQUDBERO, R
8007I4087S
30-346
M
OOLDBERS, S C
8007160391
SO-320
0
GOLDBERG, 8 C
8007880110
90-399
0
OQLDBERO.B C
8007310314
00-308
0
GOLDMAN. H
8007080333*
PR
ODl-DSMITH, R
8007180187"
30- 1O
0
GOLDSMITH. R
8007160212"
50-10
0
QOLDBMITH, R
8007020195*
30-10
H
OOLDSCHMIDT, N
0007020447
PR
GOLDSMITH.R
8007020203*
30-10
H
GOLDSMITH, R
8007140625*
50-320
H
OOLDBMITH. R
8007140629*
30-320
H
GOLDSMITH, W
0007290392*
QA999
GOLDSMITH.R
6007230649
90-10
D
GOLDSMITH, R
8007140337
30-10
0
GOLDSMITH, R
8007140337
30-10
0
GOLDSMITH, R
8007140337
90-10
0
GOLDSMITH. R
8007140337
30-10
0
GOLDSMITH, fl
8007220548
90-10
D
OOUD3MITH.R
S00720.QS37
30-10
D
ooMCALvea, A
8007030332
FOIA
CODDLING, W
B007020237*
SO-320
H
OQQDLINO, B
8007310375
30-2B9
H
GOODMAN, L B
8007160681*
90-409
R
GOODWIN. V L
8007100370*
70-1131
GOODWIN, C
8007280199
30-344
Q
GOODWIN. C
00073 1O47B
50-344
0
GOODWIN, C
BQ072S0330
90-344
Q
GOODWIN. C,
8007300296
50-344
Q
ODODMIN, C
8007130120*
30-344
0
QOODWIH. C
8007250360
50-344
a
OOQDUIH, C,
8007290889
50-344
Q
GOODWIN. H L
8007210077*
70-1131
GOODWIN. C
B0070 10334
50-344
F
QOQDWINiC
8007160420
PR
GOODWIN, C
8007070340
30-344
P
GOODWIN. C
0007090227
50-344
P
GOODWIN, C
8007090300
30-344
F
OOQDUIW, C
8007090329
30-344
a
GOODWIN, C
8007070300
30-344
p
GOODWIN, C
0007070307*
30-344
p
OOODWIN. C
8007090360
30-344
p
QDQDWIM. C
8007160608
30-344
p
QOQDHIN.C
B007 170424
50-344
p
GOODWIN. C
B007230474
90-344
p
GOODWIN, C
B0073003B7
90-344
p
GORDON, 0 J
8007160911
50-397
A
PERSONAL AUTHOR INDEX
435
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
CORDON. C
8007310231
NUREG
GQSSICK. L V
0007170620
70-143
GOSSMANN, 5 R
0007290174
RES
QOBSMANN, S R
3007230164
RES
QOS9MANN, S R
8007290201
RES
QHABDWSKI. A M
9007140001
30-367 0
ORACE. R H
8007070293
30-309 P
ORAESSER.K L
B0071 40337
50-295 R
QRAE8SEH.K L
8007160655
90-293 S
ORAE3BER.K L
B007220449
50-295 8
GRAESSER.H. L
8007230587
SO-304 8
QRAMBAU, 0
8007 11 0163
State Prog
GRAM-UNO, R W
8007100434
REGOO
CRAVES, fi H
a007080077
50-2 1 3 B
QRAVE8, R H
8007140359
50-213 S
CRAVES, R H
0007090321
50-213 S
GRAVES. R H
B007 180390
50-213 R
GRAVES, R H
B007230411
30-213 Q
CRAVES, R H
0007230535
30-213 8
GRAY. F 9
0007020369
PR
CRAY. F 9
00070S0424
PR
ORAV, F B
80070300B2
PR
CRAY, J R
8007100029
30-344 0
CRAY, j R
8007140023
70-130B
CRAY. J R
0007 170 ISO
30-289 0
CRAY. J R
B007170215
70-1308
CRAY, J R
800717O220*
70-1300
GRAY, J R
BOQ725042B
50-344 0
GRAY. J R
8007230433"
50-344 0
GRAY, J fl
8007290437*
30-344 0
GREEN. H J
8007160478*
30-327 P
OREENMAN, E 0
8007230736*
SO-277 0
OREENMAN, E 0
8007020070*
50-277 0
OREENE, 0 A
0007310234
NUREG
OREENMAN, £
0007100101*
30-293 0
OREENMAN, E 0
8007170692*
30-219 0
QREENMAN.E 0
8007230137*
30-289 Q
OREENHAN. E 0
0007020 US
30-247 8
GREEN, D
8007160956*
50-259 R
OREEN, D 0
B0071S0423
30-443 M
OREEN. D 0
B007230441
30-443 N
QREER.R H
0007100099*
50-346 0
OREER,fi J
8007280497*
30-67 Q
QREOER, L R,
8007100039*
30-409 Q
GREOER.L R
80072400090
SO- 135 Q
OREOER.L R
800714047U
50-346 Q
GREGORY. W 8
0007210607
REB
QRENIEfi. B L
0007230652*
50-273 A
GRENIER.B
8007140393*
SO-275 A
OREH, P, C
8007030104
PR
ORIDLEY, R L
8007070249
OEN TEC 18
DRIER, B H
800710000?
50-320 Q
QRIER.B H
8007150141*
70-364
ORIER.B H
0.007310226*
50-277 Q
ORIER.fl H
8007090370
30-271 Q
ORIER.B H
9007 140431
90-354 0
ORIER.B H
6007 140433
30-271 Q
GRIER, B,H
8007 H 0430
50-333 Q
GRIER.B H
8007140440
50-293 Q
DRIER, B H
8007140445
50-219 Q
ORIER.B H
8007140432
SO-24S Q
ORIER.B H
8007140438
50-322 0.
GRIER.B H
S007 140459
50-410 Q
QRIEft.B K
BOQ7 140462
30-277 Q
DRIER, B H
8007140466
90-3B7 0
ORIER.B H
8007140469
50-392 Q
ORIEH.B H
8007140474
50-2SO fl
ORIER.B H
8007250325*
50-206 Q
ORIER.B H
80070S0101
50-29 Q
ORIER.B H
80070201 10
30-334 0
ORIER.B H
8007020116
50-293 0
ORIER.B H
8007020120
90-317 Q
ORIER.B H
BQQ7020124
90-3 Q
ORIER.B H
8007020129
30-271 0
ORIER.B H
8007020133
50-272 fl
ORIER.B H
8007020134
SO-24-J a
SRIER.B H
8007020140
50-213 Q
ORIER.B H
8007020143
90-277 0
GRIER,B H
8007020146
30-243 Q
ORIER.D H
6007020147
30-333 Q
ORIER.B H
8007020134
90-2B6 a
ORIER.B H
B007020137
30-220 0
DRIER. B H
8007020161
90-320 Q
ORIER.B H
B007020163
30-309 Q
ORIER.B H
8007020163
30-219 Q
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
ORIER.B H
8007010258
50-352
a
GRIER.B H
8007010262
50-387
0
ORIER.D H
8007010265
50-443
0
CRIER, B H
0007010266
50-469
Q
ORIER.B H
8007010271
50-354
0
ORIER.B H
8007010275
50-313
0
ORIER.B H
8007010277
50-293
a
ORIER.B H
8007010279
50-317
0
ORIER.B H
0007010260
50-322
Q
ORIER. D H
600701 0283
50-363
0
GRIER.B H
H0070102B6
50-271
0
ORIER.B H
80070 1 0289
50-29
a
GRIER. Q H
8007010294
30-412
G
ORIER.B H
8007010296
50-244
Q
GRIER.B H
6007010300
90-272
0
ORIER.B H
Q007010302
50-333
a
OHIER.fl H
0007010303
50-286
a
ORIER.B M
8007010310
90-277
0
GRIER, B H
6007010312
50-249
Q
ORIER.B H
6007O1O314
90-220
Q
ORIER.B H
8007010315
50-330
0
ORIER.B H
6007010316
50-309
0
OHIER. B H
B00701031B
50-219
a
ORIER.B H
0007010321
50-334
G
ORIER.B H
6007010322
90-3
0
GRIER, B H
8007020097
70-1100
GRIER.B H
8007020010
50-319
F
ORIER.B H
8007030399
50-319
F
GRIER.B H
8007010565
90-219
G
ORIER, D H
6007210591
30-293
a
ORIER.B H
6007210554
50-317
Q
ORIER.B K
0007210533
90-3
Q
ORIER.B H
8007210559
50-213
Q
ORIER.B H
B007210561
50-334
0
DRIER, B H
GO 072 1O 563
30-412
a
GRIER.B H
8007310564
90-219
Q
GRIER.B H
6007210960
50-363
Q
ORIER.B H
8007310571
90-332
Q
ORIER.B H
6007210572
50-320
Q
ORIER.B II
0007210575
50-309
G
GRIER.B H
8007210580
50-243
Q
ORIER.B H
8007210585
50-220
Q
ORIER.D H
8007210590
90-410
Q
ORIER.B H
6007210595
90-333
Q
GRIER.B H
8007210599
50-286
Q
GRIER, B,H
6007210600
50-277
Q
ORIER.D H
6007210604
30-352
a
GRIER.B K
6007210606
50-387
Q
GRIER. Q H
B0072106IO
30-372
Q
ORIER.B H
6007210612
30-334
Q
ORIEFI, B H
8007210613
50-443
0
ORIER.B H
80072 106 1 5
50-4B3
Q
GRIER.n H
8007210619
50-S44
a
ORIER.B H
8007210623
50-271
0
ORIER.B H
0007210626
90-39
Q
DRIER, B H
0007010399
30-319
F
GRIER.B H
B007 160337
30-317
Q
ORIER.B H
0007160341
90-3
Q
ORIER, B,H
6007160344
90-213
Q
GRIER, B,H
6007 16034 5
90-412
Q
QRIER.B H
8007160346
50-363
a
OR I Eft, B H
8007160349
30-320
Q
CRIER, B H
8007160352
30-309
a
OHIER.B, H,
8007160357
50-336
a
QRIEH.B H
8007160358
9Q-306
a
ORIER.B H
8007160362
SO-273
0
QRIER.B H
8007160363
30-443
a
GRIER.B H
6007160364
30-244
0
ORIER.B H
6007160367
50-465
Q
QRIER.B H
8007160370
50-29
Q
ORIER.D. H
8007160398
50-334
0
GRIER.B H
8007 160401
90-916
Q
ORIER.D H
0007160777
50-271
P
ORIER.B H
B0072200B4
50-286
P
GRIER.D H
6007140354
30-219
Q
ORIER.B H
6007140297
90-293
0
ORIER.B H
B007 140360
50-345
G
ORIER.B H
B007 140264
30-410
Q
ORIER.B H
B007I40267
50-277
Q
ORIERi B H
B007 140269
90-333
Q
ORIER.B H
8007140272
90-220
0
ORIER.B H
9007140279
30-271
0
ORIER.B H
8007140278
30-332
0
ORIER.B H
8007140380
30-332
Q
ORIER.B H
0007140284
30-394
a
AUTHOR
ACCESS ION
NUM3ER
SUBOECT
CATEGORY
GRIER, D H
0007140287
50-387
Q
CRIER. E H
6007230576
50-471
Q
DRIER, B H
800729053 1
50-412
Q
GRIER.fl H
S0072B0587
50-363
0
CRIER. B H
90072B0594
SO-3E3
Q
GRIER, B H
8007290600
50-423
Q
GRIER.B H
B0072S0603
50-410
Q
ORIER.B H
30073B0608
50-352
fl
GRIER, B H
3007280612
50-337
0
GRIER, Q H
9007200614
50-354
0
ORIER.B H
B007380616
90-443
0
GRIER, B H
9007200619
50-435
0
ORIER.B H
8007170561
50-277
P
ORIER.B 11
8007180530
50-29
P
ORIER.B H
8007200401
90-293
0
GRIER, B H
8007020612
70-364
GRIER.B H
S 007020 6 14
50-317
Q
CRIER, B H
8007020617
70-371
GRIER, fl H
0007020622
70-320
ORIER.B H
8007020635
70-33
ORIER.B H
8007030631
70-1 143
GRIER, B H
BO 07020683
50-272
a
GRIER, B H
8007020606
50-22O
a
QRIER.B H
80Q7Q20AB7
30-396
a
GRIER, B K
3007020691
90-293
o
GRIER.B H
B00702O692
50-2 1 3
0
GRIER.B H
8007020696
50-334
a
ORIER.B H
8007020697
90-319
3
GRIER.B H
BO07020700
50-243
Q
ORIER.B H
8007020703
50-277
a
ORIER.B H
B00702O704
50-271
0
ORIER.D H
BOO 70207 06
50-29
0
QRIER.B H
80070B0709
50-30?
a
GRIER, B H
8007020710
30-3
Q
ORIER.B H
8007020713
90-244
0
GRIER.B H
600702O7 1 4
50-2O1
a
ORIEfi. H H
B0070207 1 3
SO-3S0
a
ORIER.B H
B007020717
50-333
a
GRIER.B H
8007 150 ISO
70-364
ORIER.B, H
8007020463
50-3 1 7
a
ORIER.B H
80070BQ4B6
30-393
Q
ORIER.B H
80070204B7
30-244
Q
GRIER.B K
0007020-189
90-220
Q
ORIER.B H
6007020191
50-2BA
Q
GRIER.B H
6007020492
90-277
0
GRIER.B H
8007020494
30-248
Q
ORIER.B H
8007020496
30-313
a
GRIER.B H
0Q0702Qf»«P7
50-3
Q
QRIER.B H
0007020'3'JB
50-334
Q
ORIER.B H
6007020501
50-309
0
ORIER.B H
GOD7020502
50-219
Q
ORIER.B H
BQ07020503
50-334
Q
ORIER.B H
S00702Q504
50-412
Q
GRIER.B H
8007020507
30-363
Q
DRIER. B H
8007020908
50-483
a
GRIER.B H
6007020309
50-322
Q
ORIER.B H
8007020511
30-410
Q
QRIER.B H
6007020313
90-307
a
QRIER.B H
8007020516
90-352
a
ORIER.B H
0007020B19
50-272
a
ORIER.B H
8007020521
90-333
Q
QRIER.B H
B007020524
90-443
a
ORIER.B H
6007020526
30-3SO
0
GRIER.B H
B00702033B
50-271
a
ORIER.B H
B00702O530
90-29
0
GRIER.B H
BD0721O120
50-289
Q
ORIER.B H
G007 160693
50-293
a
ORIER.B H
8QQ7160609
90-317
a
ORIER.B H
8007160688
50-3
a
ORIER.B H
8007160670
50-213
a
GRIER.B H
8007160693
30-413
a
ORIER.B H
6007160696
30-334
Q
GRIER.B H,
8007160699
30-219
a
GRIER.B H
6007160701
90-363
a
ORIER.B H
6007160704
30-322
a
ORIER.B H
0007 1 60700
30-3BQ
a
GRIER.B K
BOD7I60711
90-309
a
ORIER.B K
6007160714
50-245
a
GRIER.B H
6007160717
50-410
a
ORIER.B H
B00716O720
30-220
a
ORIER.B H
8007160723
50-333
a
ORIER.B H,
80071 60736
50-296
a
GRIER.B H
0007160720
30-3B2
a
ORIER.B H
0007160733
50-337
a
GRIER.B H
6007160736
90-272
0
PERSONAL AUTHOR INDEX
.UrHOR
ACCESSION
HUNBER
SUBJECT
CATEOORV
.8 H
6007160737
30-354
a
, Q H
SQ07 160-7 40
50-443
a
.B H
BQQ716O741
50-485
a
, n n
B007160747
50-244
a
rB H
S007 16 0790
50-271
a
.B H
8007160752
50-29
a
,E H
30Q7U07BO
70-135
.B H
BOOV 140783
30-201
Q
.B H
B0071407BB
70-1113
.B H
8007160792
30-77
a
,B H
3007160796
50-2OB
a
I, D H
3007160803
30-97
a
,D H
H007 160806
30-5
a
i, B H
H007160S09
30-225
Q
.B H
B007160B13
30-166
a
.B H
BOD7 1 60B20
30-131
a
•n U
B007 1 60B22
BO-199
0
. J H
B007 1 60B29
30-20
a
I.T! H
B007 1 iOB27
30-37
a
, B H
30071 60B28
50-223
a
, B H
3007160929
50-184
a
I, D H
8007160931
70-39B
t. B H
8007160832
50-47
Q
1. B H
8007160333
50-170
a
,a H
B007 160836
50-277
a
;,H H
B007160B37
50-193
o
(,H H
BOQ716GB40
70-1100
, B H
B007UOB42
70-33
,B H
80071608^5
70-620
.0 H
8007160846
70-371
),a H
B0071 60849
SO-54
Q
,B H
B007310IH6
30-77
Q
, B H
B007210127
50-199
Q
.B H
B00721OI33
30-20
0
I, B H
B007aiOJ3*
SO-3
Q
l.B H.
6007210138
50-225
0
,B H
S00731O140
90-37
Q
..B H
6007310142
50-223
a
.B H
800721 OH 3
90-166
0
l.B II
8007310144
50-134
a
(.8 H
8007310147
90-34
a
", B H
8007210149
30-1B4
o
t,B H
B007B10151
30-47
Q
,13 H
B007210133
50-208
0
-,B H
BOO 731 01 55
50-97
Q
R.B H
6007210159
50-201
a
(, D H
8007210161
50-193
Q
(, 8 H
8007210164
30-293
a
H,0 H
B007210171
30-317
Q
R.D H
B007H1017S
50-3
Q
R.B H
B007210174
5O-2 1 3
Q
ft. B H
6007210178
90-412
0
ft, D H
8007210131
30-334
Q
K, B H
8007210192
90-363
Q
R-B H
8007210193
50-219
a
R,B H
B007210199
30-322
a
R.B H
6007210202
30-320
Q
R, B H
6007210204
50-309
i
R. B H
6007210207
50-245
0
n. D "
6007210210
5O-4 1 0
Q
«,B H
8007210211
50-220
0
R, B H
•BOO72102tB
50-333
Q
R,B H
B007210322
SO-2B6
0
R.B H
BQ072102S5
30-332
0
R.B H
B00721022B
50--277
0
R.B It
B00721O271
50-387
Q
R.B H
8007210271
50-272
Q
R.B H
B0072 10278
50-354.
Q
R.B H
B0072 10231
SO- 4 43
a
R, B H
80072 1 O284
50-483
a
R. D H
30072 102B6
50-244
a
'R. D H
B0072I0290
30-271
a
-R.B H
3007210291
50-29
a
:R,& H
B0072 10296
50- 1 70
a
!R, B H
800721031 2
30-332
a
:R,B H
8007250S'l3
30-334
a
:a, D H
8007210019
50-236
a
:R.B H
8007E30091
50-293
a
•R,B H
8007230096
50-317
a
R.B H
80072-30106
50-3
a
:R,B H
B00723O107
50-213
a
:R.B H
8007230113
50-334
a
:n,B H
B0072301 15
50-412
a
;«,B H
8007230121
50-363
Q
•R, B H
8007230122
50-219
a
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEQORV
DRIER. B H
DRIER, B If
QRIER.B H
QRIER.B H
ORIER.B H
B00733012S
BQ0723OI29
8007S30I32
B007230I4&
000723O149
50-323 0
50-320 0
3O -3 09 Q
90-215 a
90-220 Q
ORIER.B H
DRIER. 9 H
CRIER. B H
QRIER.B H
ORIER.B H
80072301 SI
8007 230 156
B007230I59
B007230I63
B00723Q166
50-410 Q
50-286 0
50-352 Q
30-277 Q
50-3B7 Q
CRIER. B H
QRIER.B H
&REER. B H
SfllER.B H
DRIER, n H
9007230 J 70
0007330173
0007230178
BC07230180
0007330183
90-354 Q
50-272 0.
50-413 Q
50-485 Q
50-244 Q
QHIER, B H
QRIER.B II
DRIER. B H
QRIER.B H
ORIER, D H
QOO 7230 186
HO 07230 1 B9
6007210289
6007230716
8007210197
90-27 1 Q
50-29 Q
70-iB7
50-277 Q
90-277 0
DRIER, D H
ORIER, B M
ORIEH.B H
ORIER. D H
QRIER.B H
5007210443
6007210491
6007250313
6007210071
60072101 19
30-2 1 3 F
50-272 0
30-H&6 Q
50-243 0
30-820 0
ORIER, B K
ORIER, B H
ORIER, B H
QRIER.B H
DRIER. B H
SQ0724O3P3
BQ07Z4G356
fl 00724 0372
6007240122
8007240430
50-333 Q
50-219 0
30-273 O
30-271 <*
50-277 ft
ORIFFIS. C A
ORlFFtH,W
ORIMES, C T
OR1HES. B K
OR IKES. B K
8007310323
9007110101
800723 002B
B0072202IA
BQQ7140US
NUREO
PR
50-219 P
I1IEC
50-277 H
QRIHEB, B
QRIHEB, B K
QFIIMEB, B K
QRIMES.B K
GRIMES, E K
H007110S17
8007110439
B00703Q013
B007 170299
B007300297
50-277 H
NUflEO
30-536 H
SO-3 H
50-339 E
QROCE, R H
QROCE, R. H
QROCE, R H
OROCE, R K
QnOCErR H
9007210367
8007210399
B007S10454
6007030229
B00731060I
30-309 R
50-29 R
30-271 R
50-309 P
50-309 Q
ORCNEMT'eR.E C
ORQBSMAN, K
OROTENHUIS.M
OROTEHHUIS.M
DROVER. J L
9007290050*
8007140514
8007140519
8007300567
B00720Q1O4II
•State Proo
FOIA
50-250 F
&0-2SO P
50-204 S
QRUDB.fi L
CUILHERT. J
OULBRANBEN-E A
QUHBLE.F U
CUHGLE.F U
BOO 70300 15
8007110242
8007100357
80070104 S5»
B0070B0394*
RES
FOIA
PRM
50-266 E
90-266 B
QUPPY, J,P
GURUNATHAH.S
OU3TAFSON, F A
OU3TAVE.R P
OUTH. R V
6007210003
80&7220593*
8007010627*
B.007020542
B00722053B
RES
90-304. 8
CONTRACT
CONTRACT
50- 1 O D
HftASS.W P
HAASS, W P
HAASS, W P
HAASS! M P
HAA36,H P
800723000911
8007110-499
fiC-06190126
B0070SQ322
B007 110579
30-24.4 Q
TOP REP
30-241 C
TOP REP
TC1FREP
HAASS, U P
HAASS, M P
HAASS, H P
HAASS, U P
HftCKETT.D B,
60071 7 0693
8007H0312*
8007230060
8 007210239
ao07030208»
50-206 P
50-29 P
REOOD
TWHEP
30-293 P
HAFERA. T
HAQA.P B
HAQAN.T F
HAQAN, T £
HAOAN,T T
3007150625*
Q007210399
30.07020366
8007070129
9007100304
50-234 R
50-437 A
COMTRACT
CONTRACT
CONTRACT
HAQAN, T
HAOEN, H
HAQER, R
HAfJEfi.R
HAOEY, H A
8007180186
90O70101O3*
9007O20S5O
3007230613
8007020007
CONTRACT
50-219 P
50-320 0
50-320 0
CONTRACT
HAGEY. H
HAIRSTOH,M 0
HAIRSTQN.W 0
HAJRSTON,W 0
HA1RSTON.W O
B007250569
SQ07Q70176.li
B0070701BQ*
9007070 190»
80070701 94*
CONTRACT
50-348 R
30-349 R
5O-349 R
90-348 ft
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEODRV
HAIB8TON. W 0
HAIRSTOH, M 0
HAIR8TON.U G
HAIRBTOMrW 0
HA1RSTON,U 0
BOO 7070199*
B007070C04*
800707 020B»
8007070214*
B00707Q217*
50-34B R
BO-348 R
30-348 R
50-348 R
50-348 R
HAIR3TQN.H 0
HAIRBTON. U 0
HAinSTQN.U 0
HAIR8TON, W 0
HArRSTON.H Q
8007070219*
8007070223"
8007070226*
B007070E28"
8007O70230*
50-348 R
50-349 R
50-348 R
50-348 R
50-34S R
HAtRBTQM.U 0
HAIRSTON, W 0
HAIR8TQN, M 0
HMRSTQN. W 0
HAIRSTONrW 0
8007070232*
B007160B61
B007O10446*
8007O10412>
8007 1 30668*
50-348 R
50-349 B
30-34Q B
30-349 B
50-348 R
KAIST, D P
HAIST.D P
HAI8T, D, P
HALE. C J
HALE.C J
8007180018*
8007240326*
B00724O314V
8007140088*
8007280038*
30-206 Q
30-206 Q
50-344 0
OA999
•QA999
HALE, C J
HALE, C J
HALE. C J
HALE, C J
HALE, C J
B0071 40048*
B0071&0126*
8007160171*
8007290337*
8007290321*
QA999
QA999
QA999
O.A999
QA999
HALEMAN. 0 R
HALEYi 0
HALL,R E
HALL. R. E
HALL. R £
8007020464
8007100191*
8007110076*
S0071 10234*
8007140447*
PR
PR
30-382 0
90-445 Q
50-382 Q
HALL, R. E
HALL- R. E
HALL. R, E
HALL. R, E
HALL, R E
B0072-40337*
8007280730*
B007 140361
8007010372
8007010379
50-49B Q
30-482 0.
90-171 F
90-263 F
50-333 F
HALLrR E
HAUL,W C
HALL, R E
HALL, R A.
HALLER.N 11
B007290562
80071 SO926
B007290634
8007310269*
S007 140121
30-237 F
TOPfiEP
50-409 F
FOIA
SECY
HAUBTEAD, R 0
HAL8TEAD. R J
HAMILL, M L
HAMMER SCHMIDT
HAHPBDN, D C
B007 140538
80071102B7
8007250396*
B00724040&
B007O70395
PR
PR
50-397 A
50-320 H
REQOD
HAN. K
HAN, 6 Y.
HANAUER.S H
KAHCOCK. D
HANCOCK, T>
BOD7220142*
80070*70034
B007 170371*
8007030127
B0071 10019
QA999
XPORTLIC
30-556 0
PR
PR
HANCOCK. J A
HANCOCK. J A
HANCOCK j J A
HANCOCK, D
HANCOCK, D
8007150303*
B007O10463
8007110402
8007160570
8007160570
50-302 Q
90-302 3
90-302 B
90-466 0
90-466 0
HANCOCK. D
HANCOCK. D
HANKLA. D J
HANRAHAN, E J
HANRAHAM, E J
8007160643
8007160643
800721 036B
8007100032*
B007 100038*
90-466 &
50-466 0
90-250 P
70-143
70-143
HANRAHAN. E J
HAN8EN. H A
HANSELL, D
HAN8EN. L J
HANBEN.L J
80071 401S2
8007140541*
B007070028
B0070S0561
8007070177
90-247 P
90-483 Q
50-914 0
71-9130
71-9130
HANSEN, M A
HAtJSEN, L, E,
HANBEN, L. E
HANSEN.L.E
HANSEfo, L E
8007210123*
8007070004
B007070006*
8007O70008*
8007S40224
50-4B3 Q
XPORTLIC
XPORTLIC
XPORTLIC
XPOfiTLIC
HANSEN, L E
HANBEW, W. A
HANBEM, L E
HANBOH, U, W
HARBISQN.D
9007210247*
8007300169*
B0071603B6
8007220307
8007160B07
XPORTLIC
30-4B3 0
71-6591
40-299
50-329 B
HARMON, D H
HARtWfi D U
HARMOMr D. M,
HARRANr O
HARRIS, J. R
B0073 10303*
8007240434
80O731001B
8007160680*
8007190021*
FOIA
XPORTLIC
XPOfiTLIC
50-243 R
50-269 0
HARRISON. J J
HARfUSOK.H C
HARRISOM.H C
HARRIBQM J E
HARRISON. J E
B007160479*
8007170297*
8007170329"
8007110012*
BOQ7UOOIO
30-546 Q
40-8602
40-B691
XPORTLIC
XPORTLIC
PERSONAL AUTHOR INDEX
437
AUTHOR
ACCESSION SUBJECT
NUMBER CATEGORY
HARRIS, J R
HARRISON, J J
HARRIS, L
8007290414* 50-424 0
8007230710* 50-546 Q
B007300475 PR
HARRISON, P
8007290600* 50-230 S
HART, E M
B0070203I6 StJt* Profl
HART, J
HARTEH.E S
HARTIOAN, J P
HARTIOAN, J P
HARTIOAN. J P
6007080239* 50-382 S
8007010266 40-B43B
8007110397* 50-346 S
8007230378" 50-346 B
B007280602* 50-346 B
HARTIOAN, J P
HAHTMAN. C J
HARTMANN, A J
8007280643* 50-346 S
8007230478 50-135 F
8007020644* TOPREP
HARTMAN, C J
HARVEY. 8 L
S0070S0346 50-135 R
8007170163* 30-339 P
HARVEY, 9 L
HASHIMOTO, K
60071701B9» 50-339 P
80071406B6 REOOD
HATFIELD. M D
HATHAWAY, L R
800702018B* COMMISSION
6007160413 PR
HAUOHNEY, C J
8007020513 50-201 P
HAUOHNEY, C J
HAUOHNEY, C J
HAUOHNEY, C 0
HAVERKAMP, D
HAWKINS, K L
B0070903B4 50-201 P
B007140I93 50-201 P
8007280069 50-201 P
B007230223 50-287 B
8007160644 30-332 H
HAYDEN, L E
B007210079 PT21
HAYES, D W
HAYES, D W
HAYES, 0 W
HAYES, D W
8007090179* 30-440 Q
3007070139* 50-440 Q
8007110479* 90-358 Q
B007330412* 30-329 0
HAYES, D W,
HAYEB, D H
MAVHURST. R S
HAYNEB.J 0
HAZELRIQO, S
8007300143* 50-4B4 0
8007300136* 50-331 Q
80073 10469* 50-320 0
8007290704 50-206 P
8007010500* 30-293 8
HAILE.A J
HEALY, J W
8007010274* WASTE MOT
B007IB0603 ACRS
HCALY. J W
HECTOR, A 0
8007100053 HEQQD
B00711Q019 PR
HEDDINOB, T P
B0071B052B WASTE MOT
HEDEMAN, M N
8007110026 PR
HEDEMAN, W N
8007020400 PR
HEDEMAN, W N
8007280037 PR
HEDEMAN, H N
HEOARTY, W
8007290696 30-10 D
8007240462 FOIA
HEONER.d, D
HEIDER.L H
8007230174* 30-334 Q
B007130143 PR
HEIDER,L H
8007110460 30-271 Q
HEIDER.L H
HEIDER.L H
8007210379 50-271 Q
8007230173 30-271 0
HEIDER.L H,
HEIDER, L H,
HEIDER.L.H
8007250I8B 50-271 Q
800723027B 50-29 0
000714033B 50-29 P
HEIM. 0 E
HEIMEMANN. J M
B007S00236* CONTRACT
800710021B 30-10 D
HEINEKE, J, H
HEINEKE, J M,
HEIBHMAN.R F
HEIBHMAN.R F
HEISHMAN.R F
6007220024 NUREO
8007220034 NUREO
8007220112* 30-313 0
6007K20093 50-315 0
8007100283 30-331 0
HEIBHMAN.R F
HEISHHAN.lt, P
HEISHMAN.R F
8007070091 50-282 0
8007010178 30-233 0
8007140463 30-153 0
HEIBHMAN.R, F
HEISHMAN.R F,
800714034B 50-346 0
8007140487 30-263 0
HEIBHMAN.R F
HEISHMAN.R T
HEISHMAN.R F
HEIBHMAN.R F,
HEISHMAN.R F
B0071 10049* 30-263 Q
8007110044 30-263 0
H007210322 50-346 0
B007240012 00-301 0
8007240185 30-282 0
HEISHMAN.R F
HEISHMAN.R F
HEISHMAN, R,F
HEIBHMAN.R F
HEI5HMAN.H F
8007240236 90-398 Q
8007230296 50-331 Q
8007230314 50-305 Q
B007230371 30-10 0
8007300307 50-263 Q
HEISHMAN.R F
HEIBHMAN.R F
HEIBHMAN.R, F
HEISHMAN, R.F
HEISHMAN.R F,
8007140186 30-282 Q
8007300601 50-346 0
8007130102 50-358 Q
8007230273 50-373 0
8007240307 30-346 0
HEISHMAN.fi F
HEISHMAN.R F
HEIBHMAN.R, F
HEISHMAN.fi F
HEISHMAN.R F
8007210297 50-358 Q
8007240396 30-303 0
B0073I0330 30-373 0
8007310334 50-346 0
8007310278 30-319 Q
AUTHOR
ACCESSION SUBJECT
NUMBER CATEGORY
HELFRICH, 0 F
HELFRICH, 0 F
8007170255 XPDRTLIC
8007290312 XPORTLIC
HELMi K
HELTEMES, C J
HELTEME8. C J
9007030383 XPORTLIC
8007020089 TOPREP
B00702Q248 SECY
HELWIO. R A
HELWICK.C
HEMBY, E 0
HEMMINGER.E 0
6007070054* CONTRACT
8007090197 50-142 0
80072B0487* 50-594 A
8007090362 NUREO
HENDRIE, J M
B007180036 COMMISSION
HENDRIE, J M
HENDRIE, J M
HENDRIE, J M
HENDRICKSQN, T A
7909110639 COMMISSION
7909240333 50-320 U
7909260537 COMMISSION
8007160109* QA999
HENDRIE, J H
BQ070iOS34 COMMISSION
HENDRIE. J M
HENDRICKBON. T
B0070B0672 COMMISSION
8007070370 TOPREP
HENDRIE, J M
HENDRIE, J M
HGNNINQ-BACHS. C
8007250007 COMMISSION
8007250111 COMMISSION
S007290BS1 NUREO
HENRYr L
HENRY. 0 H
8007S90067* 50-320 H
S0071001S1 REOOD
HENSLEY, K D
HENSLEV, K D
HENBLEY.K D
B0071000S2» 70-143
8007100069* 70-143
9007100023* 70-143
HENBLEY.K D
HERBEIN, J 0
HERBEIN. J 0
HGRBE1N, J 0
HERDEIN, J 0
B0071B035S 70-143
80071 10040» 30-320 J
B0071 10032* 50-3SO J
8007010153 SO-2H9 Q
8007020535 50-289 0
HERBEIN. J 0
HERBEIN, J 0
HERBEIN, J 0
HERBEIN, J C
HERDEIN, J 0
8007010326 50-299 P
80070103BS 50-387 F
S007070266 30-2B9 Q
8007070248 50-2B9 S
B0070702B1 30-289 P
HERBEIN, J 0
HERBEIN, J 0
HERDEIN, J 0
HERBEIN. J 0
HERBEIN, J 0
8007070394 50-330 P
B007070302 90-289 S
8007070343 50-369 P
B0070S0074 50-2B9 P
8007080344 50-287 F
HERBEIN, J 0
HERBEIN, J 0
HERBEIN, J 0
HERBEIN, J 0
HERBEIN, j o
B007080338 50-330 P
B0071 10446 50-297 Q
8007 1 40385 50-320 H
8007140419 50-330 P
8007080311 50-289 S
HEflBEIN.J 0
HERBEIN, J 0
HERBEIN, J 0
HERBEIN. J 0
HERBEIN, J 0
8007080375 SO-2B9 0
B007150721 50-2B? 0
B0071-10346 30-289 P
8007140363 50-269 P
8007140381 50-2B9 0
HERBEIN, J 0
HERBEIN, J d
80071B04U 50-289 P
8007130589 50-389 P
HERDEIN, J 0
B007I60524 50-269 S
HERBEIN, J C
8007160618 50-38? S
HERBEIN, J 0
8007160467 90-320 F
HERBEIN, J 0
HERDEIN, J 0
HCRBEJN, J 0
8007320498 71-90B1
8007220353 30-320 F
8007250356 50-269 0
HERBEIN. J 0
HERBEIN, J 0
B0071B0404 90-3SO J
8007210372 50-28? P
HERDEIN. J 0
HERBEIN, J 0
HERBEIN, J 0
HERBEIN, J 0
B0072205B4 30-330 J
B007210378 50-289 Q
8007230504 50-289 0
8007220471 50-289 F
HERBEIN, J 0
S007230592 SO-2B7 Q
HERBEIN, J 0
HERBEIN, J 0
80072S0493 50-289 0
8007230401 50-389 Q
HERBEIN, J 0
80072906(7 30-2B9 Q
HERBEIN, J 0
HERBOLBHEMIER
8007290799 50-289 R
8007290621 30-10 D
HERD, R
HERDT. A R
80071701H9* CONTRACT
B007160B72* 30-414 Q
HERDT,A R
B007070I07* 50-335 0
HERDT.A, R
B007100131* 30-327 0
HERDT. A R
8007IOQ060H 50-251 Q
HERDT.A R
8007 I 607 42* 50-338 Q
HERDT, A R
8007 i 003 I 3* 50-400 Q
HEROT, A R
9007290380* 50-333 Q
HERDT, A R
8007290432* 50-366 0
HERDT, A R
B0073I0245* 50-416 0
HERDT, A R
B007310501* 50-270 0
HEREFORD. J M
B00701050B* 50-327 S
HEREFORD, J M
8007210475* 50-327 S
HERLIHY, D
8007010129 40-B7SB
HERLIHY, D
9007010140* 40-B72B
AUTHOR
ACCESSION SUBJECT
NUMBER- CATEGORY
HERLIHY. D
B0072B0694 40-8733
HERLIHY, D
8007320070* 40-3733
HERLIHl.D
B007220Q63 4O-B729
HERMANN, R A
HERNANDEZ, C
B0070 10234 50-303 P
300723063'?* SO-397 Q
HERNANOEZ, 0
8007170539* SO-361 Q
HERNANDEZ, 0
60072 1 057B* 50-S2S Q
HERR, R K
B0071 30009* 90-493 Q
HERSCH.M M
HEnSKOUITZ.M B
8007070034* XPCRTLIC
B007I50014 RES
HESS, H J
8007S30499* 50-394 A
HESS, R J
0007070135 XPDRTLIC
HESS, R J
80072B0479 50-394 A
HEUHNER, A T
8007030113 PR
HEWARD.R W
0007O3D334 30-320 T
HEYER.R S
HICHEY, A E
90072300B4 40-8335
3007130308* 30-213 F
HICKLE, B J
B0071 703791 50-285 R
HICKMAM, 0 L
B007030033 70-2909
HICKB, M M
8007100348 PR
HIESTAND, 0 B
80071 7036B 50-407 0
HIOOIN3, J C
8007310304* SO-347 0
HILF, C L
3007170574* 30-260 P
HILGERi U
B0071 90063* 50-219 H
HILL, N M
30073100SS* 50-272 0
HILL.T M
8007280194 WASTE MOT
HILL, 0 E
HILLMAN.R E
HIMEDAUCH, N
8007320303* TOPREP
B007150713* 50-219 R
a0070B0348« 50- 1 93 R
HIND, J A
800702O21 l« 50-295 d
HIND, J A
ao0702O199 50-275 a
HIND, J A
900701O578* 70-1308
HIND, J A
6007010573 70-1308
HIND, J A
BQQ7U051.B* 70-923
HIND, J A
B0071I0513 70-925
HIND.J A
BOO7140094 50-2B2 a
HINDi J A
BOQ714Q430 50-153 Q
HIND, J A
800714069211 70-1193
HIND, J A
S007I50096* 70-2609
HINDi J A
B0072401Q7* 50-263 Q
HIND, J A
800714:0673 70-1173
HIND, J A
B007150092 70-2609
HIND, J A
BOO7340104 50-263 Q
HIND. J A
8007240024 50-346 Q
HIND, J A
8007310261 50-303 O
HIND, J A
8007310267* 50-305 Q
HIND, J A
B007290B69 50-254 Q
HINDi J A
ffOO7290a75» 50-254 Q
HINEBiE
8007140191* 50-341 Q
HINE8, E
8007I4042S 30-341 0
HIRATA, Y
8007290487* OA999
HIHATA, Y
QQ 0739 04 77* GA999
HOiF P
800)7240409 NUHEO
HQADLEYiS D
HOADLEV, S D
8007160394 XPOKTLK
B0071603?9» XPORTLIC
HOAGLAND.K E
HQDODON.A P,
HODOES, J W
SOO7310019 50-217 P
80O 7010398 50-449 H
B007140537* 70-U3
HODOEB.J W
HODOEB, J N
S00703029B* 70-143
800729O393" 50-364 <1
HODOES, J U
HODSOIJ.M L
60O7160727* 70-1113
B007070112 PR
HQEFLINO, R K
HOFFMAN, D P
HOFFMAN, D P
B00710024I 30-266 0
800731O427 50-255 R
B00714OS43 PR
HOFFMAN, D P
B0071Q0072 PR
HOFFMAN, D P
HOFFMAN, D P
80070 1O20O 30-135 P
80071 SQ134 PR
HOFFMAN, D P
B0070I0313 50-155 0
HOFFMAN, D P
B00701O447 50-139 P
HOFFMAN, D P
HOFFMAN, D P
8007010473 50-155 F
8007S40I36. PR
HOFFMAN, D P
HOFFMAN, D, P
HOFFMAN, D P
B007070210 30-153 P
B007030230 50-255 P
B007030268 30-155 P
HOFFMAN, D P
HOFFMAN, D P
HOFFMAN, D P
HOFFMAN, D P
8007080189 50-239 S
8007080338 50-258 P
80O731O177 SO-25B Q
B0071 10204 30-155 P
HOFFMAN. D P
B007110358 30-298 P
HOFFMAN, D P
HOFFMAN, D P
8007I4O390 90-255 Q
800714O39f 50-155 F
HOFFMAN. D P
HOFFMAN, D P
8007140310 50-253 Q
BC-07140424 50-153 Q
HOFFMAN, D, P
B007140444 50-153 Q
PERSONAL AUTHOR INDEX
AUTHOR
ACCESSION
NUMBER
SUBJECT
CA reson Y
OFfHfH, D P
S 007 15 0803
SO-255 0
HFFHAN.B P
80Q7U04S8
SD-155 0
FFMAN. D P
9Q07U0505
50-255 P
GFFKAN. D p
BQ071SOfl24
SO- 155 3
OFFMAN, & P
BOQ7SI0394
SO -255 R
(1FFHAU, D P
3007820452
50-155 0
QFFMAN, D P
8007220472
50-t5S Q
nFFMAN,D P
6007230170
50-255 B
QFFHAN, D P
BQ07S20S13
50-255 Q
IOFFMAN, D P
0007330460
50-255 0
OefVW, D P
BOO 7230465
50-1 S3 Q
IQFFtWI, D P
800732034 1
50-155 F
ICFFMAN, D P
BQ07330395
50-253 0
IOFFMAM, D P
6007830516
50-155 0
iOFFMAH, D P
8007240017
50-J5S 0
WFPMftU. D P
BOO7350373
50-155 Q
IOFFKAH, D P
BQO728051??
50-155 J
lOrKKAM, D P
6007310423
50-IS5 J
1QFFMAW, D P
BOQ7260570
50- 1 &S F
HOFFMhIJ, D P
BO 07290 60 fa
30-1&3 Q
HOFFMAN, D P
B007290M4
30-255 S
•iOFFMAM, D P
6007290 £,30
50-255 <1
•iOFFIWJ. D P
BG0730Q439
50-155 F
HGFFMftN. D P
8O072SQ533
50-155 P
•1CFFIW4. D P
BD07H9OA9I
50-155 a
-laOAM. J P
8007100046
PR
HOHME. F.C
8007280200
40-S503
HOL&EM, R H
B0070206B2
PR
HDLDEI1.R H
B 00725 07 JO
PR
•KH-DEN.R B
8007310137
50-332 Q
MLLAHDj P
90072 2Q5B3*
50-H49 B
iOLLIKOSUDHTH
9007170380
50-359 H
IOLQDV, D J
8007020015*
70-135
MUDDY. D
30071 HOOB2*
70-371
HQLOHAY, C F
9007 1 8035B
RES
H0LOWAV, C F
6007140031
RES
HOI.OHAY, C F
S007 1 40634
RES
HDLOHAY, C F
S00730004I
BUHE0
HOLGWAY, C F
B0073102S1
RES
HOLTER, <J II
BQ072402B3
KUREQ
HOLYOAK.R H
00072904 4B
50-373 A
HOUYOfiH.R H
S00739Q693
50-373 A
HOLZWEIO.S r
80070BQ360*
PR
HONBER3ER.R F
80-Q71000B6
PH
HOOD, Q
8007020167*
50-329 A
HOQD, &
BO 070903 93
3Q-329 F
HDQD. D B
B007140496
50-329 A
HOOD, D B
B007240O4Q
50-329 A
HOOD.D S
8007300104
50-329 h
HOOD. D S
B 00730 0261
30-329 A
HOOD, D B
8007290-034
90-329 A
HOPHINB.J D
B007I 10049*
so-ats »
HDPHINS.J B
6007240019*
30-301 0
HEW IN, H A
6007030346
30-445 0
HGHIH, H A
8007030246
50-445 0
HORIN, H A
8007130437
50-M5 (J
HORIN.H A
B007 130437
50-445 0
HC-RIN.H A
80073 1 033B
50-443 0
HQRIN.H A
90073 1 032S
SO-44S 0
HORN. A J
9007240273*
5Q-20& Q
flOSW.A J
8007300343*
50-306 Q
H08BLER.D. E
8007080007
30-320 S
H063LER.D E
B0070a0654
30-320 Q
KQB8E.ER, D E
6007070337
3&-320 O
HOSSLER , D E
8007070333*
50-320 0
HQSSLEft, D E
B007 070365*
30-320 0
HQBBLER, D E
aOO 7 070371*
50-32O 0
HOUGHTON.T C
B0070100S7
50-414 A
HQUCHTCIN.T C
B007010IOO
50-4 I i> A
HQUCKTON.T C
BO-070900&0
50-395 F
BOUCWrON, T C
BQQ7Q30-0(,l
90-375 A
HGUOHTON. T C
B007240Z37
50-416 A
HOUSTON. K D
80070100?9>i
30-309 f
HOVEY.O K
B0070B0534
50-320 P
HOVEY, 0. H
B0070 10454
30-320 3
HQVEY, G, K
80070 tO4iiO
50-320 P
HOVEVr 0. K
9007U05S2
90-320 B
HQVEY, 0. K
9007070320
50-330 P
HQVEV.O K.
B007I 10422
50-330 P
HOVEYiO K.
B007 140352
50-320 p
HQVEV.O K
9007170373
50-320 f
HOVEY.O K
BQ071B037£
50-320 P
HQVEY, 0 K
B007 190499
50-320 P
HQVEV.O K
8007160596
50-320 9
HOYEY, 0, K
8007170338
50-320 P
*™
ACCESSION SUBJECT
IIUffDEH CATEGORY
HOVEY.G K
HOVEY, O «
HQVEY, G K
HQVEY, 0 K
HOVEY, 0 K
0007150507 50-320 F
eoO?!5a5I3 SO-320 S
6002150513 50-3SO B
9007160431 50-320 0
8007170442 50-320 P
HDVEY.O H
KQVEY, O rt
HOUEV. 0 k
HOVEV, 0 K
S00717O395 30-320 P
9007210359 50-320 R
SQ07SIQ383 30-3SO P
B007230442 50-320 P
B0073 10406 30-320 P
HDVEY. G K
HCWEV.G K
HOVE/, 0 K
HOWARCW E
8007230434 50-320 S
900723043? 30-330 S
00072906) 1 30-320 S
6007300447 90-320 P
80071 SO 132 PR
HOWARD, J E
HDVE.P H
HOME. P 11
HOUELL.J C
B007210373 30-293 0
eoo7too422* so-400 a
B0071Q0418* 30-400 Q
BQQ71QQS1? 50-400 <S
BOO7tS01Q7« 30-261 Q
HOHELL, J C
HOMELL, J C
HOHtHSTGN. L C
HCWLETT.Q H
HOfcSON. r a
SCO7090I /O* 30-369 Q
00Q7KO553* 50-297 Q
H00739O145 MURES
B0072tO37S* BO-336 R
S00715O730 SO-320 I
HOVLE.J C
HOVLE. J C
HOVLE, J C
HOVLE, J C
HdVLEjJ C
000731OU35» 5O-195 H
B007OSOSIS ACR3
BO 0723 0030 ACR8
flOO 7230130 rtCRS
8007230012 ACRB
KdVLE.A
HOVLE. J C
HOVLE, J C
HOVLE.J C
HPVLE,J C
8007070414 CONTRACT
S007Z30O13 SO-327 0
60072301 J 2 rtCSS
fl007230023 ACRS
B007230026 ACRS
HOVt-E. J C
HQVLE.J C
HOVLE.J C
HOVLE, J C
HOYLE, J C
80072307E9 ACRS
9007210030 ACRS
80070*0313 SO-3 O
B0071 10002 50-273 0
BOO7170S37 IOCFR
HQYLE, J C
HOYLE, J C
HOYLE, J -C
HCttL&rt
HOVLE, J C
B0071I0330 50-35E3 0
SOori IO331? 5O-2BO 8
8007170334 IOCFR
9007300577 CONTRACT
B007 140363 SO-3 ffl
HUVi-e, J C
HOYLE.J C
HU3SAHD. J H
HUH9ARD, J M
M/BER.J E
S007110i197 50-443 0
8007310334 ACRS
SOO*aiC48<i» SO-413 A
B0070301B9* 30-413 A
60J7SeOl 16i 50-320 M
HUDSON, 0
HUDSON, B D
HUDSON, T D
HUDSGW, I B
HUDSON, r B
8007230223 RES
BO 0728 0263* SO-B20 Q
B007160553 50-498 0
eOO?300070 SO-49B 0
8O07300090 30-498 O
HUFF, D
HUGHES. J
HWWCtffT, D H
HUNNKUTT.& 11
HUHNJtUrr.O M
0007030339 70-33
8007070179* 50-440 0
3Q073f 0)93* QA999
B 007290501!* OA999
e0070IOI71* <iAW?
HUHHICUTT, D H
HLWNfCUTT, 0 If
HUNIJICUTT, D 11
HUHNICUT7, 0 H
HUNMICUTT. D H
8007300193* OA999
a007SSQ109f OA999
B0071601S7. QA997
90071601460 QA999
3007t60207» QA999
HUNNICUTT, D M
HUNftlCUTJ.a H
HuiwicuTTiO M
HUNNICUTT, D ti
HUNMICUTT, D
B007290189* QA999
6007230594* QA999/
so orai 0537* 04999
8007220209. QA999
B007110621 50-313 B
HUNMICUTT, D H
HUNSTAQ,, A A
HVKSTAQ, A A
HVHSTAV, A A
HUNSIAD.A A
6007290331 30-313 8
8007010529* 50-306 B
800.7160362* 50-HB2 R
6007SI 0380* 50-306 8
8007210444* 30-302 B
HUNSTAD, A A
WJNTES, D R
HUNTER^ V H
HUNTER, V H
8007290677* 50-282 S
B007230607« 50-369 Q
B007S 10307* SO-277 0
8007100339* G&999
B00722015S* QA991?
HUNTER! R S
HUNTER, H 8
KMTEK. a 3
HUPPERTiW W,
HUPPER7, W W
B007tB0324 50-313 ft
8007300233 90-313 Q
6007250493 30-315 P
B007O10151* QA99?
AUTHQH
ACCEBSIDM SUBJECT
NUMBER CATEODflY
HURFlAN. 0
HUflSH, <5
HURST, J B
HUSCBV, D E
HUSTON, R W
9007180413* 30-245 R
Q007300370 ^0-312 H
B007230174" 50-330 H
90072B0676* 50-317 S
800709000B 50-255 P
HUSTON, R U
HUTTQN. J n
llUTTON.P H
HVLAND.F B
ICE, 11 D
B007O90314 30-253 S
80070300B4 PR
QOO/22005B RES
B0071601BB* QA999
B007O30064 FOIA
IHRIO.R
INSRAM, F L
INORAH, F L
INDUQE.S
IORII- J A
8007150475 50-484 0
BO07010063 30-273 K
QD072B0129 30-320 H
S007E20234* 30-303 P
B0071002S6* TOPREP
IPPOLITO.T A
IPPOLITQ, T A
IPPOLITO, T A
IPPQLITg, ^ A
IPPOLITO. T A
B007O70207 30-331 F
800701020B 90-293 F
B007U04BO SO-37B P
60071404B6* 50-29B P
S007 140492* 30-29B P
IPPOLITaT A
IPPOLITO, T A
IPFOLtTO, T A
IPPOLITO.T A
IPPOLITO, T A
B007140300 30-254 P
Q007140903* 30-234 P
8007140914* 30-234 P
0007210024 30-259 F
B007I40603 30-323 P
IPPOLITO, T A
IPPOUTO.T A
IPPOLITO.T A
IPPOLITO.T A
IPPOLITO, T A
8007140614* 30-323 P
B007140624* 30-333 P
B00721Q049 30-371 F
9007230028 50-259 P
8007180313 SO-263 P
IPPOLITO.T A
IPPDLITO, T A
IPPOLITO, T A
IPPOL1TO, T A
IFPQLJTO, T A
S007230713 30-S9B F
80072B0229 SO-333 P
B0072B0249* 80-333 p
B007240233 30-39B P
80072402BS BO-Mf P
IPPQLITD. T A
IPPQLITO.T A
IPPOLITO.T A
IPPOLITQ.T A
IP-POLITO, T A
B007240231* 30-B39 P
B007240234* 30-339 P
8007240427 30-323 P
H007240433* 30-323 P
e0072a0073 30-220 0
IPPOLITQ.T, A
JPPOLITQ. T A
IPPOLITQ,T A
IRVINE, R J
IBLEY.T
9007310215 30-331 P
SQO7310222* 30-331 P
B007310229* 80-331 p
90072B0294 FOIA
9007010439* 30-346 B
19LEY.T
ISLEY, T
ISLEV, T
ISRAEL. S L
IBRAEL.& L,
B007 170450* 50-346 B
8007220465* 30-346 S
QOO7880378* 30-346 B
B006240237 30-269 P
B007010UO 30-3 p
IHRAEL. S L
IWANrcKI.FI
IWANtCKI,R E
JADLQN, R A
JAULON, R A
BO 07 170398 50-247 P
B0071B009/ 40-8697
8007B90Q90 40-B697
S007090031 SO-SB1* H
8007090031 30-389 H
JACKIW, I U
JACKIM, I H
JACKSOH, P 0
JACOBS, A
JACOQB, A
8007220112* 50-315 Q
B0071403BB* 90-346 0
B0071300BO PR
B007Q10624 CONTRACT
G007020024. CONTRACT
JftCQSS, A
JACOBS, A
JACOB BOH- R D
JACOBS, B D
JAMEB. H, E
BOO 70 106 13 CONTRACT
fl007300393 CONTRACT
B00710019S* 50-263 S
B007300064 PR
8QO71403BO* 40-299
JANECEK.R F
JANECEK, R F
JANECEK.R F
JftNECEK.R F
B007020736 50-B49 0
B007010190 30-237 P
B007070116 30-10 p
B0070B0063 50-10 P
SOO723067B* 30-10 0
JANECEK.R F
JANECEK.R F
JANECE«,R F
JANGCEH.R, F,
JAWECEK.R F
8007100142 30-234 P
8007)60630 30-237 Q
B007B102I2 30-237 P
8007310333 30-23* 0
B0073004B3 30-237 0
JANECEK.R F
JANECEK, R F
JAKECEK, R F
JAHtNEK.K
JANIMEK.K,
BO 07200593 50-10 D
B0072B0367 NUREO
B00731043S SO-JO 0
B00701Q1S? Btit. Proj
JAM 1 NEK, H,
JAWOH8KI-R L
JELtNEKiJ A
JEHKIMS. R. V
JENK1NS.O R.
S007290060 Bt*t. Prog
B0070B0312 pft
9007220082* 40-8771
S00722Q391* 30-304 8
90071 10376* SQ-321 Q
PERSONAL AUTHOR INDEX
439
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
JENKINS. O R
B007210093*
70-1151
JENKINS, 0 R
8007240376"
50-348 Q
JENKINS. 0 R
8007290404*
50-390 Q
JENKINS, O R
B007290B53*
50-320 Q
JENNINOS, J
0007240147
PR
JERNIOAN. E P
0007300329*
50-219 0
JETT, 0
B007090025*
SECY
JEir. 0
B007 140079*
10CFR
JEWELL, W A
30072401349
50-203 S
JOHN, D F
8007 170380
50-445 K
JOHN, D F
B0071703BB
50-445 M
JOHN, D F
80071703BB
SO-445 M
JOHNSON, H T
6007030013
PR
JOHNSON, C
B007030093
PR
JOHNSON, J
8007290332*
50-236 0
JOHNSON, R E
S007210430*
OEN TEC IS
JOHNSON, J
8007290263*
50-293 Q
JOHNSON. K
S007030367
71-9027
JOHNSON. 0 F
8007210165*
50-244 0
JOHNSON i A H
BOO? 100061*
50-335 Q
JOHNSON, H D
BQQ7220197"
30-313 Q
JOHNSON, I fl
0007210139
ACRS
JOHNS, L 3
B006 170304
HISC
JOHNSON. A
0007210107"
90-224 Q
JOHNSON. A B
8007100370
PRM
JOHNSON. R E
8007210423
OEN TEC IS
JOHNSON. R W
8007100031
50-344 0
JOHNSRUD, J D
8007070273
50-320 0
JOHNSON. M C
8007180296
50-395 Q
JOHNSON, H P
B0072 10601
50-309 0
JOHNSON, R H
8007100039
50-344 0
JOHNSON. P H
8007300295*
50-344 Q
JOHNSON. C R
B007 180469
71-6698
JOHNSON. R E
0007230524
PR
JOHNSON. W P
B007230404
50-307 P
JOHNSTON, M P
800723050B
30-275 0
JOHNSTON, M P
B007230308
50-278 0
JOHNSON. W D
0007290331
50-313 S
JOHNSON. R U
0007310433
50-344 S
JOHNSTON, M P
B00730D096
50-273 0
JOHNSON, J J
B007240478
NUREO
JOHNSON. J
B007090 166»
NUREO
JOHNSON, J
8007090167*
NUREO
JONES. C C
B007020B87*
FOIA
JONES, C C
0007020292*
FQIA
JONES, 0 C
0009130445
RE5
JONES, K A
0007090113
PR
JONES, R K
B00722008I*
WASTE MOT
JONES, 0 C
8007310234
NUREO
JONEB.U C
0007020299
30-2B9 0
JONES, H C
B007110096"
90-285 0
JONES, W C
B007020075
50-2B9 a
JONES, W C
BOQ7210187
50-285 Q
JONCB,W C
B007020430
50-295 0
JONES, C E
0007190118*
50-481 Q
JONES, W C
B007020419
50-285 Q
JDNCS.W C
0007030001
PR
JONES, M C,
8007180122*
90-203 Q
JONESON, B J
0007080096
40-215
JONES, V I
S007140026
30-275 0
JONES, D E
6007190073
PR
JONES. D W
8007 140086*
70-143
JONES, M C,
B007010471
SO-2B3 P
JONES. M C
B00730007B
50-203 P
JONGS. J, A
5007010353
30-400 F
JONES. J A
S007170366
30-400 K
JONES. J A
8007170628
90-400 A
JONES, J A
8007 1706 32
30-400 C
JONES. J U
S007290B30*
50-270 B
JONES, W C
8007080364
90-283 P
JDNEB, V
B007070123
50-275 0
JONES. W. C
B007170376
50-283 R
JONES. W C
BOQ7230530
30-285 F
JONES, M C
8007230358
50-285 Q
JONES. Q W
8007100244
30-599 0
JONES, R K
B0073I0497
WASTE MOT
JONES. M C
6007280530
SO-2BS P
JONES, W C,
8007SB0601
30-285 Q
JQNG3, Y I
8007310466
30-273 G
JONES, B. U
8007220110
50-599 0
JONES, B W
0007230612
50-19B C
JONES. D W
8007280286
90-938 F
JON8SON, A
8007110240*
TOPREP
JORDAN, A 0,
B007100104
PR
JORDAN, W B
8007240030*
COMMISSION
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
JORDAN. M S
B0071 00037*
50-155 G
JORDAN, W S
B0071 00042*
50-153 0
JORDAN. W S
B0071 00033
50-155 0
JORDAN, W 5
8007100037*
50-155 0
JORDAN. H S
B0071 00042*
50-159 G
JORDAN, U S
B0070B0005*
50-289 0
JORDAN, H S
0007000004
50-269 C
JORDAN, M 3
B0070B0005*
50-269 G
JORDAN, U S
B0071 1004B
PR
JORDAN, U S
90071 1004B
PR
JORDAN, U B
0007220539
50-389 0
JORDAN, M S
8007220530*
50-289 G
JORDAN, W S
B007220529
50-28? 0
JORDAN, U 5
8007220930*
50-287 G
JORGENSEN, B L
0007010393*
50-255 Q
JOUKQFF. P
B0071101B4*
50-206 0
JDY. D
BOO710D072*
70-143
JOY, D R
8007100057*
70-143
JOY, D
HOQ710O020*
70-143
JOY. D R
0003230064
70- 1 43
JOY. D R
S00722025I"
70-143
JOY.J. H
8007190603*
50-206 R
JQYNER.J H
8007020013*
70-135
JOYNER.J H
9007140643*
70-139
JDYNER.J H
8007100082*
70-371
JQYNER.J H
B0072S0746*
70-1100
JOVNER.J H
S007 170630*
70-133
JQVNER. J H
3007230124*
70-371
JOVNER, J H
B007290494.
70-820
JUUIAN, C
8007340256
50-296 5
JULIAN, C
B007240260
30-296 S
JUNOE.H R
B007020359
HASTE MOT
JURY, H J
8007220566
30-155 F
JUSTUS, P B
8007900047
50-344 P
KAWLE.J B
8007150049*
70-1113
KAHLE, J B
8007020220*
70-1151
KAHLE, J B
0007010301*
70-024
KAHLE, J Q
S0072S0225*
70-27
KAHLE. R
8007160504*
CONTRACT
KALWIANAKIS.N
8007080162
50-265 S
KALIVIANAVUB.il
B007190619
50-254 R
KALIVIANAKIS, N
8007200470
50-263 P
KALIVIANAKIS, N
0007240112
90-265 S
KALIVIANAKIS, N
8007240105
30-294 S
KALUARF, D R
B007030350
NUREO
KAMMEREft, C
5005160109
50-320 H
HAMMERER, C
B009200282
30-289 H
KAKMERER.C
8009160223
30-320 H
HAMMERER, C
8005200319
30-320 H
KAMMERER, C
8009200324
50-2B9 H
HAMMERER, C
8009200343
50-2B9 H
KAMMERER, C
BOOS 160 1 S4
50-320 H
KAMMERER, C
8005200357
50-330 H
KAMMEREH. C
8005200366
I1IBC
KAMHERER. C
B005200434
SO-320 H
KAMMERER, C
8006120212
50-320 H
KAMMERER, C
6006120438
50-2B9 H
KAMMERER, C
8006120437
90-330 H
KAMMERER, C
B0061204Q4
30-320 H
KAMMERER, C
B0071 00438*
50-320 H
KAMMERER, C
B0061204I9
MIBC
KAMMERER, C
0006120501
50-320 H
KAHMERER.C.
SOOt 120402
11 ISC
KAMMERER, C
B0071 10399
COMMISSION
KAKMERER, C
8007250190
50-320 H
KANAK.K K
8007020356
RES
KANAK.K K
S007140044
RES
KANE.H F
8007140229
50-395 A
KANKUN, J E
8007300143*
90-454 Q
KANN.O A
8007280400»
50-339 P
KAPLAN. A L,
8007150033s
70-1113
KAPLAN. A L
8007030231*
70-1113
KAPLAN. A L
8007130031*
70-1113
KAPLAN. A L
B0070B02I2
70-1113
KAPLAN, A L
0007280077
71-4986
KABCS3AK, R H
B007290689
IJUREO
KA9SEHAUK.N L
0007110571*
SO-4B2 U
KATZ.L
BOO 7290368*
OA999
KAUFMANN.R 3
8007140076
HISC
KAUFMAN, N C
8007230177
RES
KAUFMAtJN, R S
8007100452
40-8502
KAUFMAN*, R 8
8007140607*
40-B502
KAUFMAN, N, C
8007E80I71
RES
KAUFMANN. R 8
B0072 10067
40-B/6S
KAUFMANN, R 8
8007B30667
40-8728
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
KAVANAUGH, P 11
3007160616
50-383
K
KAY, J A
goo7oao3io
50-29
F
KAY, J A
8007090079
50-29
P
KAY, J A
8007 140300
30-29
P
KAY. J A
6007290621
30-3f
P
KAY, J A
BQ07230BBA
50-39
P
KAV, J A
BOQ72B0626
30-29
P
KAY, J A
Q0072S0492
SO-21?
F
KEARNEY. J J
0007020671
PR
KEARNEY, fl W
3007110OI 1
50-320
J
KEARNEY, J
B007S1016B
PR
KEE, E J
8007210017
RES
KEENAN, R P
6007070023
XPORTLIC
KEENAN. R P
B007tO0263
XPOF1THC
KEENAM. R P
6007IO0271*
XPOHTL1C
KEENAN, R P
B007J 10021
XPQRTLIC
KEENAN, T
6007170202
FOIA
KEENAN, R P
60071 B0449
XPORTLIC
KEENAN, R P
600716045311
XPOHTLIC
KEENAN, R P
8007310049
XPOHTLH:
KEENAN, R P
6007310073*
XPCWTLIC
KEENEY.W P
6007BSOIB4
71-9132
KEENY.S M
6007090145
PR
KEESE, B
B007300573
PR
KEHLER.P
B 007 10 0363
NUREO
KEHOE.D V
8007230231*
50-293
Q
KEIMIO.R R
8004240221
50-219
S
KEIMIO.R R
8005230131
50-245
S
KEIMIO.R R
80070BOS36
50-213
S
KCIMIO, R R
8007310365"
50-245
Q
KEIMIO.R R
80073 100S9*
50-272
Q
KEIMIO.R R
8007230191
50-313
8
KEIKIO, R R
8007350197
50-219
S
KELLER, J H
8007290317
50-294
P
KELLEY, U D
B-0070 10031*
QAf99
KELLEV, D L
B007I50171*
90-285
Q
KELLODO.P J
8007100134*
50-416
Q
KELLOOO, P J
800723 D362
so-aao
S
KELLY, A
8007 ID 01 31
PRM
KELLY, J A f
8007100223*
50-267
Q
KELLY. A F
8007100223
SO -267
Q
KELLY, A F
800707016!*
30-284
a
KELLY, A F
0007070157
50-284
a
KELLY, J
8007210162
50-443
S
KELLY. J E
8007140417*
PR
KELLY, A
60072104*2
HISC
KEMPER, J 3
8007210331*
30-352
(1
KEMFER. J S
8007310214*
50-332
0
KEMPER. J 5
8007340236
50-352
S
KEMPER J 3
B007250152
30-332
S
KEMPEB, J S
600731 02B6«
50-353
S
KEMPER, J S
6007090269
50-352
S
KEHPER, J 3
6007310567
50-352
a
KEMPER, J S
B007IB0446*
50-277
p
KEMPER, J 8
6007260300*
50-27B
p
KEMP1NERS.U L
6007 1 A 052 1*
CONTRACT
KENDRICK. H
8007220030*
50-366
H
KENHA, U B
8007)00374*
70-1191
KENNA. U B
B007100404*
70-1201
KENNA, N B
B007QtOU7.
70-113
KENNA. U B
6Q071O0362
70-1151
KENNA, W B
B0071O0390
70-1301
KENNA. U B
B0070BOH13
70-1151
KENNA, N B
6007070003
70-2478
KENNA. U S
B007I 40067*
70-143
KCNNAiU B
6007130101*
50-361
Q
KENNA, U D
B007140513
70-143
KENNA, U B
6007O 1 030 1 •
7O-B34
KENNA, U a
6007O 10293*
7O-B24
KENNA, U B
6007030293*
70-143
KENIJAiU B
6007230220
70-27
KENNA. M B
80070101OB
70-1-13
KENNA, M a
8007150027
70-1113
KENNA, M B
8007110102
SQ-333
Q
KENNA, K, B
B0071O0093
50-261
a
KENNA, H 0
B00729038S
50-364
Q
KENNA, H B
BQ07Q9016S
50-369
a
KENNA, H 0
B007 1 40076
70-1 A3
KENNA, U D
80071500B7
50-261
Q
KENNA, H D
3007140058
70-143
KENNA, U B
9007140542
50-297
0
KENNA, U B
8007160716
70-1113
KENHA, W B
8007 1 &0038
70-1-13
KENNA, H B
80071 60745
30-338
a
KENNA. U B
8007180303
70-M-V3
PERSONAL AUTHOR INDEX
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
INIIEDV.R T
'MNEDYi E H
NMEDV.E H
NNEDY, It T
SNNEDY. R T
30070 20 16B
3007020323*
B0071 10093"
B007130S01
B00730Q06B
COMI1ISSIDN
50-3EO U
50-271 H
COMHIE3ION
COMMISSION
EMHEDV, R T
FCNIJEDY, R T
EWEDY, R T
GNNEDY, R T
ENNEDY, (I T
Q007iaOU4
SOQ7IB0216
Q0071BOS50
60071t30flB9
BQOTIQ0039
CDMHJGSIDN
COMHIB9ION
COHMISSiON
COHMI9BIDN
CDMMI9SIOIJ
ENNETH, D F
ENIJEDV.fl T
HNI1EOV.H T
ENRtCK, J R
ENR1CK, J H
BOO707O12B
3007110270
B0071BO*74
t!0 07220 960
B007220560
71-3^2
COMHISBION
COHMIBBION
XPORTLtC
XPOHTLIC
PtWICK, J R
ENFUCK.O R
FHVOM, T
.EPFORD.C
EPPLEH, J 0
00072906(33
BOQ723Q603
0007300053
80070B0086
B007J40493
KPORTL1C
XPORTLIC
90-327 E
30-320 0
BO-461 0
,EPPLER, J G
lEfPLEfl^J O
IEPPLER, J 0
IEPPLER, J 0
IEPPLER.J 0
B007140SOB
30D7J 40510
9007 1400 17
BQ07U0523
00071 40533
90-34,7 0
50-343 fl
50-135 Q
50-40*9 0
50-263 Q
(EPPLER, J 0
<EPFLER, 0 0
lEPPLEfi J 0
KEPPLER, J 0
^.EPPl-ER, 0 0
fl007140S35
B007140E37
B007H0545
3007140551
B0071 40554
50-331 Q
30-373 0
50-10 Q
90-440 Q
50-353 Q
4EPPLEH-J 0
^EPPLEFt, J «
(.EPPLEH, J 0
\EPPLEH.O 0
tEPPLEft, J ff
9007140557
B00729004B
QOO 7070072
BO 0703002?
0007030034
&0-34J Q
90-346 H
50-10 Q
30-305 0
30-3 58 0
KEPPLER, 0 0
KEPPLEIUJ 0
«ePPLEH,J O
KEPPUER. J 0
HEPPLER.O 0
B007020037
B0070B0043
Q0070SOOSI
2007020054
UO070H0036
30-S66 Q
so-ats o
30-1 59 0
30-H63 Q
30-344. 0.
HEPPLER,./ 0
KEPPLEfl. 0 0
KEPfLER.O 0
HEI'PLGn.O 0
KEPPLEU, J 0
eoo7oaoose
G 00702 0063
G 00 702 0063
0007210353
8007210356
50-4Q9 0
30-331 0
so-io a
30-313 0
30-393 fl
KEPPLER, J 0
MtPPLCR, J 0
KEPPLEfl. J 0
KEPPLCR, J 0
KEPPLER. J 0
00072 10390
8007210360
3007210362
BOQ72 10363
9007210364
90-339 Q
30-339 Q
BO-2B2 0
30-346 Q
30-346 Q
KEPPLER.O 0
KEPPLER, J 0
KEPPLEfl. J 0
KEPPLER, 0 0
KEPPLER, 0 0
13007210401
000721040?
0007210412
B007QL006B
B0070I0071
SO-4H3 Q
30-264 Q
30-303 0
30-313 Q
30-33 B 0
KEPPUGB, J 0
KEPPLFR, J 0
KEPPLFR. J Q
KCPP1.6fl, 0 (J
KEPPLER, 0 0
B007010074
B0070I007B
Ei0070 10000
3007010096
B007QI0104
80-346 0
30-30-3 a
50-366 0
90-JO 0
30-461 0.
KEPPLER, J 0
KEPPLER.O 0
HEPPLER. J 0
KEPPUR. J 0
KEPPLER, J 0
0007010107
B0070101IH
0007010115
B007010H6
8007010133
50-341 0.
30-407 0
30-188 a
50-346 0
30-463 a
KEPPLER, J 0
KEPPLER, J Q
KEPPLER. 0 0
KEPPLER.O 0
KEPPLER, J 0,
Q0070 10127
0007010132
9007010136
B00701013(>
9007010144
30-263 0
50-367 0
SO-331 Q
30-440 Q
30-329 0
HEPPLER. J 0
KEPPLEfl, 0 0
KEPPLER, 0 0
KEPPLER, 0 0
KEPFL'EFt, 0 0
B00717001?'!
00070(0017
00072101 16
B007220I4B
fl00723015(.
SO-373 Q
40-2674
90-103 Q
80-319 Q
50-10 Q
HEPPLER, J 0
KEPPLER. 0 6
KEPPLER, 0 ff
KEPPLERrO »
KEPPLER. J ft
B007220176
0007230178
&007SS01S3
BO 07220 IBB
6007220193
50-330 Q
50-440 0
30-329 0
30-159 0
30-407 0
KEPPLER.O 0
KEPPLER. J 0
KEPPLER. J 0
KEPPLEfl. J Q
KEPPLER- J G
BOO/320193
BOO/220201
8007220204
EIQQ7220206
00072202 IS
SO-341 0
30-331 Q
30-461 0
30-367 0
30-263 -0
AUTHOR
ACCESSION
NUMBER
GUDJECT
CATEOORV
KEPPLEfl. J 0
600722 02 IS
SO- 346
Q
KEPPLER, 0 0
GOQ722021B
50-346
Q
KEPPLER, J 0
8007220232
30-4B3
0
KEPPLEH.O G
S 007220236
SO- 366
Q
KEPPLER, J 0
6007220220
BO-305
Q
KEPPLER. J 0
a 0070 £03 10
50-346
O
KEPPLEfl, J 0
&0071601SB
90-313
0
KCPPLEFt, J 0
BOO? 1601 69
30-295
Q
KEPPLER.O 0
8007160173
30-255
a
KEPPLEfl. 0 0
8007 1601 70
30-329
Q
KEPPI.ER, 0 0
9007160162
5O-2B2
a
KEPPLER.O 0
HQ07160187
30-546
Q
KEPPLEfl. 0 Q
50071601^1
30-346
0
KEPPLER.O 0
0007160179
50-266
0
KEPPLER. J 0
8007160200
30—19,3
Q
KEPPLER. J Q
BOO 7 1602 03
30-303
a
KCPPLCFI- J 0
0007140309
50-10
a
KEPPLEFt, J 0
B0071t03l4
SO -3 73
a
KEPPLER- J 0
B007140317
30-193
a
KEPPLEP,. J 0
8007140319
SO-331
a
KEPPLER, J 0
00071 40331
30-263
Q
KEPPLER. J 0
B00714G323
S 0-367
Q
KEPPLEfl, J 0
BOO? 140325
50-461
a
HEPPLER, J 0
00071-10353
50-341
Q
KEPPLER, J 0
8007140340
5O-440
Q
KEPPLEft, 0.0
BQQ7 140401
&0-35H
Q
KEPPLER, J 0
QQ07240Q04
50-153
a
KEPPLER- J 0
BO,07SBQ62B
SO-4B3
a
REPPLP1, 0 G
B0073B0431
SO-SflA
a
KEPPLEft, 0. Q,
80072 BO&3 5
30-367
a
KEPPtER.O 0
9007280639
90-461
a
KEPPLEH. J 0,
8007280611
30-341
a
KEPPLER. J 3
3007230653
5O-440
a
KEPR.ER.J 0
B0072BOAS7
90-358
0
KEPPLER.O 0
B0072B07Q7
30-327
a
KEPPLER, J, 0
8007200707
50-373
a
KEPPLER., J 0
0007 I 00 4 36
50-483
a
KEPPLER, J 0
8007030023
?o-'?a3
KEPPLER, J 0
BOQ7030QK6
30-305
a
KCPPLEFt, J 0
BOO703Q027
30-331
0
KEPPLER, J 0
B00703G030
BO-266
o
KEPPLER.O 0
BOQ7O3QQ32
50-40=7
a
KEPPLEH.O 0
BO 0703 OQ31
SO-1S3
a
KAPLER, J 0
B007030037
30-10
Q
KEPPLER.O 0
000703 00*»H
30-313
Q
KEPPLER, J 0
8007030043
50-263
Q
KEPPtER, J 0
6007030046
3O-34fr
Q
KEPPLEH, d 0
6Q0702034B
30-046
a
KEPPLER.O <J
G007020349
SO-266
Q
KEPPLER, J. 0
90070 ZQ5S2
50-155
0
K.EPPLER, J 0
9007020555
90-338
a
KEPPtER, J 0
B0070EOB&H
30-303
a
KEPPUER. 0, 0
BOQ702Q999
S0-3*l
a
KEPPLCR.O 0
QOO 7 0305 62
50-387
a
KEPPLER. J 0
8007020569
30-44.0
Q
KEPPLER.O 0
000 7020 9 6(1
90-315
0
KEPPLER, J 0
B007020370
30-403
Q
KEPPLER, J 0
8007020 3 M
30-346
a
KEPPLEfl, J 0
8007020573
50-263
Q
KEPPLER. J 0
B00702Q976
50-331
Q
KEPPLEfl, J 0
B00702037B
30-409
Q
KEPPLER. J 0,
B007020SB4
30-461
Q
K6WLER. J, 0
e<K5702O3B7
30-367
0
KEPPLER.O, 0
800702058'?
80-10
a
KEPPLER. J 0
6007140974
50-483
A
KEPPLCfti 0 0
a 007 140581
SO-S46
A
KEPPLtR,O 0
BQQ7 170422
70-1220
KEPPLER. J. 0
8007170426
90-313
<J
KEPPLER, J 0,
8007170430
50-10
a
KEPPLEtt.O 0
30071704 91?
SO-353
a
KEPPLER, J 0
9007170468
30-440
Q
KEPPLER, 0 0
8007 1704 67
30-329
Q
KEPPL6R.O 0
0007170-1/4
30-133
Q
KEPPIER. J 0
B007 170479
90-407
a
KEPPLEft. 0 0
BOQ7170496
30-341
a
KEPPLEFI.J 0
BQQ71704B9
50-331
0
KEPPLCtl.J 0
8007170499
50-461
a
KEPPLER- J, 0
BO 07 170 500
70-9H5
KEPH-Efl, J 0
9007170301
30-3A7
a
KEPPLEft, J, 0
0007170,306
50-263
a
KEPPLER. J 0
0007170310
30-546
0
KEPPLCR.O 0
B0071V091S
30-346
a
KEPPLER ,0 0
BO071705IH
50-4B3
Q
KEPPLEfl, J &
H 007 t 70324
30-S66
a
KEPPLEfl, J 0
B007170S2(i
50-303
o
AUTHOR.
ACCESSION
NUtlQEt)
SUBJECT
CATEGORY
KEPPLER, 0 0
HEPPLERtJ C
KEPPLER. J 0
KEPPLER.J 0
KEPPLER. J, 0
B00717O6OT
9007170613
800717O617
9007170619
8007170623
70-S
40-3392
30-S6* 0
70-36
70-H89
M.EPPCER. J 0
KEPPLER. J 0
KEPPLER, O 0
KEPPLER, J G
KEPPLER, 0 0
B007 170626
SQ07I7O629
0007170633
SOO7170636
B00717063B
50-87 Q
50-116 0
50-294 Q
30-130 0
30-153 0.
KEPPLER, 0 O
KEPPLER.J 0
KEPPLEfl, J 0
KEPPLER, J 0
KEPPLER, O O
9007170641
B007 170644
0007170646
8007170633
B007 170657
50- IBS Q
50-151 Q
30-123 Q
30-186 0
30-S Q
KEPPLER, J 0
KEPPLER, O &
KEPPLER, 0 0
K6PPLER, 0 O
KEPPLER.J O
8007170662
6007230006
8007140178
8007230289
BOQ723030S
30-136 Q
40-4337
40-7402
30-10 0
30-313 0
KEPPLER. J 0
KEPPLER. J 0
KEPPLER. J O
KEPPLER, J 0
KEPPLER. J O
S007 230307
BOO723Q310
9007230312
BOO 7230320
0007230333
50-338 0
50-440 0
30-158 Q
50-409 Q
50-341 Q
KEPPLER -d 0
KEPPLER, J «
KEPPLER, 0 0
KEPPLER. J <t
KEPPLER, J 0
80O72303S9
BOO7230330
8007230332
B007230336
S007S3033B
50-331 0
30-461 Q
30-367 0
30-263 Q
30-346 Q
KEPPLER, 0 0
KEPPLER, 0. 0
KEPPLER. J 0
KEPPLER, J 0
KEpPueH.J 0
B007230340
8007230343
S0072 30346
BD07230356
8O07Z3035B
30-346 Q
50-483 a
50-266 Q
50-303 Q
30-339 0
KEPPLER.O 0
KEPPtER.J 8
KEPPLER. J O
KEPPLER, J 0
KEPPLER. J O
9007300974
8O0731O507
BOO7 190003
B007210O34
BOO71Q0566
50-234 Q
30-293 0
30-10 Q
30-266 P
30-263 0
KEPFLER. J 0,
KEPPLER, J 0
REPPLER, J Q
KEPPLER, J 0
KEPPLER. J <J
8007180573
BOO71B0497
B0071S0509
8007210330
BOO724024S
30-135 Q
30-331 0.
50-10 Q
40-2674
40-4337
KEPPLER, J O
KEPPLER. 0 0
KEFPLER. J 0
KEPPLER, 0 0
KEPPLEH. 0 0
B0072 40291
Q00728Q4S9
flO072BO6SI
B 007240402
8007290061
30-249 Q
80-346 Q
50-373 Q
30-253 F
50-434 8
KfcPPLER.O 0
KERR. 0 W.
KERRj 0 VI
KERR>O W
KERR.O M
BQ073 10521
0007290339*
90O729002B
80071B0021
8007010017*
50-329 0
COMMISSION
SECY
WASTE HOT
ORO
KERR.O. H
KERR,Q H
KERR. 0 If
KERR.Q M
KERR, O U
0007010039
BOO 7020 136
SO07O20699
0007140569
8007280639
8t*t» Prog
3t*t« Prng
Siat» Pros
State Proj
Statt Prog
KEflR. 0- H
KERRIGAN, J
KERRIQAH, 0
KERRIOftM.-J
KERR 10 AN, J
0007910068
8OO7160416
0007020196
0OO7110534
BO07I10361
8t*tt Prog
30-311 P
50-3SB A
30-311 P
30-311 P
KERRIOAN.J
KERRIGAN* J. D.
KErCWEN-E 0
KGTCHEH.E 0
KETCHEN.E: o.
8007210277
80072B0006
S007D10B0S
9007090320
9007140019
3Q--J11 F
50-311 P
30-369 C
30-369 0
30-369 0
KETZLACH. N
K.ETILACH- N
KETZLACH. N
KEV.W J
KHAR AHA. S 8
9007190B39
BOO724011O»
BOO 72401 2S»
80O7230375*
00O7160369«
70-B24
70-1301
70-27
50-304 Q
30-434 V.
KIEMLE.C.F
KIENLE, B
KIOOINS, B R
KILLOUOHfO 0
R:M( s. M
BOO7250396*
8007020633
8OO7010079
S 007090371
BOO7170416*
30-397 A
30-320 H
FOIA
NUREO
FOIA
KIM, S H
K1MBREU-.M 0
KIMMEL, J J
KIMMEL- J- v"
KIWQ-K 6
SOOSE90607»
H0073 10269*
800710036B"
8007170161*
0007220119*
PT9
FOIA
CONTRACT
CONTRACT
HASTE MOT
PERSONAL AUTHOR INDEX
441
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEOOOY
KINO. W A
8007030357*
CONTRACT
KINNEY. W U
80072101931
70-33
KINNEY, W W
8007210190*
70-1143
KINMEMAN, J D
8007230397
70-2000
KINNEMAN. J D
B007 180338
70-997
KINNEMAN, d D
8007230014
70-IB4
KINNEMAN, J D
8007230216
ISE
KINNEMAN, J D
80073 10273
40-8045
KINNY. W U
8007090373*
30-271
Q
KINTNER, L
8007070009
30-364
A
KINTNER. L
8007100018
30-364
A
KINTNER. L
B0072 10305
50-364
A
KINTNER, L
8007210306
50-364
A
KINTNER, L L
S0072 10393
50-364
A
KINTNER.L L
B0072 10393
50-364
A
KINTNER, L
80073B0121
50-364
A
KIPER.K L
B0072 10624
SO-410
A
KIRK. B L
8007210499
90-247
P
KISNEfl. R. A
B0072B0092
RE8
KISTER. H
8007230332*
30-286
Q
KISTER.H B
8007210163*
30-244
Q
KIBTER. H B
8007250363*
50-220
Q
KIBTER. H B
8007210233*
30-333
Q
KIBTEfi.H B
8007310504*
50-247
Q
KIBTER, H
8007290010
30-320
B
KLAMUT, C J
B00721QOOS
RES
KLEINBOROE.U P
8007100313*
30-400
Q
KLINE. J A
8007030048
50-279
0
KLINE, J A
8007330429
30-273
0
KLINOAMAN. R H
8007140413
50-320
P
HLQTZ, A, S,
8007020439
PR
KLOTZ,A S
8007020441
PR
KNAPP, P,
8007210304*
70-687
KNAPP, P
80071 300B1
30-386
B
KNICELEV, J,R,
8007130096*
70-2609
KNIEL, K
8007010330"
FOIA
KNIOHTDN, 0 W
8007160803
REOOD
KNOP,R C
8006300138"
30-329
Q
KNOP,R C
800711016BM
30-461
Q
KNOP.R C,
80071 40341*
50-483
0
KNOP.R C
B007 130033*
3Q-4B3
a
KNOP.R C
8007160764*
30-461
a
KNOP.R C
8007230066*
SO-341
a
KNQP.R C
8007310367*
30-461
Q
KNOP.R C
8007300169*
30-483
a
KNOP,R C,
B007300304*
90-329
Q
KNOP R C
80073001 37»
30-483
Q
KN0TTS, J B
0007100290
PRM
KNOTTB, J, B,
B007 160633
90-443
H
KNQTTB. J B
8007160623
30-443
M
KNUTH, D, F
8007020667
PR
KNUTH.D F
8007140286
FCJIA
KNUTH, D F
80073 1026K
FOIA
KNUTH, D, F
8007170491
PR
KOCH, L J
B00716063B*
50-461
8
KOCH,L, J,
8007160651*
50-461
S
KOCH, L J
8007160665*
30-461
B
KOCHrL, J,
8007160679*
50-461
8
KOCH, L J
8007230539
50-461
A
KOCH, L J
8007230318
30-461
B
KOCH, L J
8007300439
50-461
5
KOCH. L J
8007280306
80-461
B
KdCHER.D C
80071S0065
NUREO
KQCHER.D C
8007280095
RES
KQEBTER.O. L
B00729Q017*
30-482
Q
HOLT AY, P, B
8007 1706 I U
90-286
Q
KOPACZ, J
B0070B0172*
30-369
S
KOSTMAYEfi. P H
8007110343*
90-332
U
KOTSCH, J L
8007230153
40-6659
KOT8GH, J. L
8007230249
40-6659
KOTSCH, J L
8007300268
40-6659
KC1VACB, B
8007290858
PR
KRACHT, W H
8007290631
30-366
K
KRAMER, P B
S007100137
REOOD
KRAUSE, L
&00714063B
30-458
H
KRAHCZAK.A T
8007010488*
30-293
S
KRAMCZAK.A T
floo?aao493»
50-293
S
KREOER, H, E
8007010C90
30-320
P
KRICHIVER.R
B0071003BS
PRM
KUEHN, L B
B007130S7B*
50-327
P
KUOE. T.
B007310482
XPQRTHC
KUNSITIB, T J
B007020398*
30-338
P
KUSHNERrH L
G007140&4B*
70-139
KYOER.J A,
B007 180031
HUREO
LACEY.L R.
S007300580*
30-321
a
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
LACEY.U S
LACEY.W B
LACEY.U J
LACEY.H S
LACEY.H S
B00709033B*
BQ0709034B*
B0071B0322*
8007320434*
8007250324*
50-334 S
50-334 B
50-334 S
50-334 S
SO-334 S
LACEV.W S
LACEY.U S
LACY, F P
LADD. E
LADUN.R H
8007230331*
3007300388*
0007 130522*
B007160B91*
B007 100074*
50-334 S
50-334 S
50-337 P
COMMISSION
50-293 Q
LADUN.R H
LADUN.R H
LAFEVER.C W
LAFLEUR, J D
LAFLEUR.J D
800723030B*
B007330346"
S007290693"
8007 170509
B007020177
30-2B9 Q
50-213 Q
SO-327 S
50-330 P
50-315 H
LAFLEUR.J D
LAFLEUR, J D
LAFLEUR.J 0
LAFLEUR, J 0
LAFLEUR.J D
6007030181
B0070301B3
6007020189
B007020197
8007020202
50-306 H
30-341 H
37-47
30-171 H
37-10
LAFBER.F A
LAODHARB1NO, R
LAHR, T N
LAINA8, 0
LAINAS, 0
8007390038"
80072S02B4*
80070204 1 S
S0071103B6
B0071I0504
SO-4B3 A
50-375 H
I1ISC
FOIA
FOIA
LAINAS. 0 C
LAINAS, 0, C
LAINAB.O C
LAINA9.0 C
LAINAS. 0 C
B007100310*
B0071 10264»
B0070 10050
8007030300
8007IB0079
90-253 P
50-235 P
30-237 P
50-319 P
50-409 F
LAINAS, 0 C
LAINAS, 0 C
LAINAS, 0 C
LAMB, H R
LAMBERT, R
Q007340056
B0072BOOOB
B0072 10591
8007100437
8007100191*
30-213 P
50-39 P
30-206 5
PRM
PR
LAMPE.W F
LANAHAN. H P
LANCASTER, H F
LANDQVER.R 8
LANDSMAN, R B
80073 1039B
80072102*7*
80071 10410*
8007140599
S007090179*
30-289 H
CONTRACT
SO-302 S
PR
50-440 Q
LANDSMAN, R B
LAND, P M
LANONER.R R
LANPHER.L C
LANPHER.L, C
8007090 1S9«
B007 110451
B00723070S
B007300110
B007300110
50-440 Q
PRM
PR
30-275 C
30-273 0
LANPHER.L C
LANPHER, L C
LANTZ.P M
LAPP.R E
LARKINB, R
9007310399
80073 103B9
8007300041
80071 8022 1»
B007 160773
50-313 0
SO-3 12 G
NUREn
CGMHI8SION
MISC
LAROCHE, 0
LARBOHrH J
LARSON, J R
LASH, T R
LATHAM, B B
B007230168"
800703034B
60072902B6
80070700B4
8007290781
50-2B9 C
PR
RES
PR
OHO
LATHAM, B B
LAWRENCE, J, F
LAWRENCE, J F
LAWRENCE, J F
LAWRENCE, J F
B0072907B1
8007070036*
B007070040*
8007070044*
B007070046*
QRO
30-514 D
30-314 D
30-314 D
50-314 D
LAWRENCE, R D
LAUGQN, J E
LAUTQN.M D.
LAXAUT, P
LAZARUB, U J
8007310217
8007B1049I
BOO? 100427
BOO? 140231*
B00424022B
MUfiEO
NUREO
REOOD
50-10 H
30-293 S
LAZARUB, W
LAZARUS, W
LAZO.R. M
LEACH, F J
LEASE, R S
B007230398"
80072303B3*
S007020620
B007170612*
8007210541*
50-309 Q
50-309 Q
50-369 0
30-395 A
30-316 S
LEBER8TIEN, J H
LEBDEUF. R J
LEDERER, P D
LEE. B.
LEE.B
8007020598*
8007100437
B007100136
B0071B0034*
8007240135*
50-338 P
PRM
PRM
COMMISSION
NUREO
LEE, B
LEE.E W
LEE, E W
LEE, D R
LEE, T, D
8007180579*
8007 160741*
80071BOS19*
8007010234*
BOO? 140086*
COMMISSION
90-440 Q
50-4 S6 Q
30-267 Q
70-143
LEE. W F
LEFEVRE. H
LGFEVRE, H E
LEIBY.A C.
LEMPQE8, T E
8007100035
B007170313
8007300047
8007100437
B0071B0073
PR
50-4B2 A
SO-344 P
PRH
30-220 Q
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
LEMPQES, T E
8007210100
50-220 0
LEMPGES. T E
80073B0463
5O-230 Q
LEMPGES, T E
80 07250 172
50-220 a
LEMPGES. T E
8007170360
5O-220 R
LEMPGES. T E
30073504-72
50-410 A
LEMPQESiT E
9007280279
50-220 I
LEMPGES, T E
80 07290 5B6
50-220 S
LENAHAN, J J
SC0711O53&B
SO-4S4 0.
LENAHAN, J J
BOQ7100435*
50-400 0
LENAHfiN, J J
B007 190334"
50-553 Q
LENTSCH, J W
B007 170562
50-344 R
LENTSCH, J W
BO 07090331
MUftEO
LENTSCH, J W
9007250413
50-344 Q
LESSOR, L C
8007020333
50-298 0
LESSOR, L C
9007030295
50-299 a
LESSOR, L C
B 007090 005
SO-298 B
LESSOR. L C
B00709036S
50-29B 3
LESSOR, L C
6007090391
SO-29B R
LESSOR, L C
B0073BQS84
50-298 S
LESSOR, L C
8007250431
50-298 H
LESSY.R P
B00701Q143
50-376 0
LESSY.R P
B00722O149
27-39
LEVERANCE, J
B00714040B*
PR
LEVER I NO, R
B007230451
SO-10 D
LEVINE.M 11
B007 180253
RES
LEWIS, R C
3007150506*
5O-302 Q
LENIS.R C
9oo7ifioat7»
SO-335 Q
LEWIS, R C
9007220075.
50-335 Q
LEWIS, R C
9007240277*
SO-321 0
LEWIS, R C
8Q07280475*
50-359 Q
LEWIS, R C
8007100059
50-335 Q
LEWIS, R C
B007 100064
50-321 Q
LEWIS, R C
BOQ7340566*
50-2.50 Q
LEWIB,R C
3007100119
SO-416 Q
LEWIS, M I
30O7030349
PR
LEUIS.R C
3007 170319
50-337 0
LEWIS, R C
HD07 130005
90-327 a
LEWIS, R C
fl00717(MBO
50-324 0
LEWIS, M 1
800702046S
PR
LEWIS, L
80Q7030087
PR
LEWIS, L
8007070063
PR
LEWIS, R C
BOQ724036 B»
9O-36.9 Oi
LEWIS- L
B007170105
PR
LEWIS, C
B007 160476*
CONTRACT
LEWIS, R C
B007070394
30-34B O
LEWIS, M I
8007070276
3O-320 0
LEUIB, M I
8007100240
90-320 0
LEWIS, R C
8007190-495
90-302 O
LEWIB.R C
8007220039
50-335 0
LEWIS, H I
BOO? 1002 19
30-10 D
LEWIS, H
Q007140003
50-299 0
LEWIS, R C
S007240256
30-296 B
LEWIS, R C
B007 160797
50-335 Q
LEUIB, R C
Boo72B04ia*
50-270 Q
LEWIS, R C
000724024.0
50-296 S
LEWIS, R C
3007200460
50-259 Q
LEWIS, R C
B00724Q2M
50-230 0
LEWIS, R C
B00731O551
50-261? P
LEUIB, M I
8007310143
50-369 G
LEWIS, R C
BO 073 10538
50-297 0
LEWIS, E H
8007280627
50-445 11
LEX,B L
soo702Qija
FIEOOD
LEY6E, R H
B00735062I-*
COMMISSION
L1,C Y
B0070 1 056B
50-317 P
LI,C Y
H007 170066
90-317 P
LI,C Y
a007O20469
50-317 P
LI.C Y
3007230176
SO-3 1 7 P
LI,C Y
900791006'?
90-317 P
LIBRIZZI.F P
80070703'ia
30-272 R
LIBRIZZI.F P
8007O701 1 0
50-311 P
LIBRIZZI.F P
QQ070800&3
50-272 F
LIBRIIZIiF P
B0070B0267
50-872 S
LIBftlZZl.F P
B0070S0423
90-272 8
LIBRIZZI.F P
B007100197
50-272 B
LIBRIZZI.F P
8007 1505 It
50-272 B
LIBRIZZI.F P
8007110-144
50-272 Q
LIBRIZZI.F P
0.0071506.21
50-273 B
LIBRIZZIiF P
BOQ7150672
50-272 B
LIBRIZZI.F P
8007210365
50-272 P
LIBRIZZI.F P
B007 170437
50-311 S
LIBRIZZI.F P
800732:0331
50-27? 9
H8FUZZI.F P
6 0072206 it
50-373 B
LIBRIZZI.F P
6007210494
50-272 8
LIBRIZZI.F P
8007EBO'14B
50-272 P
LIBRIZZI.F P
SQQ7290A99
30-272 R
PERSONAL AUTHOR INDEX
ftUTHOH
ACCESSION
UUMBFR
SUDJECT
CATEGnnv
.IHRIZZI.F P
_iamzZI,F P
.IDRUZI.r P
-IBR1ZZI.F P
-ICHTEMBEROCR
900723062-1
0007270684
B00729071B
8007370637
B007020103*
50-311 S
50-311 8
30-273 S
30-273 8
70-1100
-ICHTENBEFIOER
,iCHTENBCflOtR
.ICHTEHBEBOEfl
ICHTENBEIWER,
-IC1THA.E A
aoQ7Q20io2
B0072B0737*
£100 7020 1O7
9007220-123
BOG72 10337
71-i079
70-1100
70- SI 00
70-1100
50-929 A
LICITRA.E A
LIEDERHAN, J
LIH, T H
LINOHLAD.U g
LIMDBLAO.W 0
BO 072500 4 6
800>3Q0190»
D007090&77
6007290832"
60072909S3
50-4B2 A
50-366 O
90-324 H
50-914 F
SQ-914 F
LINDER.P
LINQER.F
LINDER.F
LINDER.F
UNDENT
S 00702 06/9
000? J 40371
00071flt>353
0007200696*
0007 1 80342
30-40? a
90-409 fl
30-409 0
30-409 0
30-409 fl
LINDER.r
LINGER. F
LINDER.F
LINDER.F
LINDEfl.F
9007130092
8007140303
8007160677
B007 320094
B007210447
50-109 Q
SO -409 P
50-409 R
SO-409 Q
50-409 P
LINBEH.F
LINDEft. I-
LINDER.F
UNDER, F
LINDEH.F
aoo72BQ05o
S007220S25
BQ07a90<iBO
SO 073002 41
8007310434
80-409 0
50-407 r
50-409 0
50-40? 0
•jO-409 I
LIHEHftN.O J
LIWEHAH.J J
LINEMAN, J J
LINEMAN, d J
L INEHAN, J J
DO 07 10009k"
8O07010569
8007360173
600/1-10393
80071 4flb93
40-1162
40-1162
40-6691
40-6639
40-4492
1 I NEMAN, J J
LINEHAH, J J
1 I NEK AH, J J
LIHCMAH, J J
LINEHMf. J J
0.007070106
9007230153
9007330131
B007230376
9007330667
40-9tG3
40-6659
40-2239
40-66B2
40-3728
UNCHAN. J d
LINEHWI, J J
LINEHAW, J 0
I.INEHAH, J 0
LINEHAM, J J
BQ07 230672
0007 230660
8007230084
0007230245
0007230713
40-9681
4O-B5B4
40-8389
40-fi69T
40-B452
LINEMAN. J J
LlNEflOERQFn.Q A
LINGREN.C L
LINNEMAN.R E
LINTQN, 0 H
BOO 73002 SO
B007H90744i
8007130033
000717032B»
8007090399
<,0-t>t>$<}
90-444 0
FtEOOD
FOlft
PR
UNTQNtO W
LIPIHBKI.W C
LisT.R
LITTLE.H 3
LITTLE.W 8
B007130070
8007210027
G 007230739*
traoviooavi*
0007230303*
PR
ACRB
GOMitaaioN
30-336 Q
90-331 Q
LITILC.rt
LlVEMQRE.H H
LLOYD. L L
LOATB.i: T
LQCHSTET.H A
300728023-1
9QQ73(03&7«
9007020332
BQ071SOOS9
0007 11 0067
CQNntACT
90-4&1 Q
PR
RES
PR
LOCKE, J, W
LOCKE. H F
LOCKE >R F
LOOKER, M
LOQ1UDICE.J M
SOO 72403(11
B007IB03S9
B0072303B(.
8007310182*
B007300BVa»
PR
90-133 0
10-133- 0
QA999
CONTRACT
LQ1S.L
LGNO.F J
LONO, F J.
LOUD, F U
8007010722
B007170S94»
80071 70S &7«
800701 OS33»
30-BS5 P
90-593 0
30-333 0
SO-3B7 0
ni-wo,!? V
AUTHOR
ACCESSION
NUMBER
SU3JECT
CATEOOR^
i
LUNDVALL, A E
LLfNDVALL, A E
LUNDVALL.A E
LUNBVALL, ft E
LUNDVALU, A E
G0071B0600
9007230029
B0070103S9
9007O9O334
9O070EO436
50-317
71-3B3
SO-317
50-317
90-317
0
p
p
p
LUNOVALL. ft C
LUNDVALLr/i E
LUNDVALL. A E
LUNDVAt-L. A E
LUNDVALL, A E
6007250663
8007020557
0007100229
8007310044
9007310574
30-317
50-235
90-317
50-317
90-317
0
p
0
0
0
LUMDVALL. A E
LUHBVALL, A E
LUNDVALL. A E
UJZA, K V,
MftCARTHUR.T G
6007090291
Q00717O352
BO 07220 390
6007210491
aOQ7290410»
50-317
50-317
90-317
NUREC
27-47
p
p
F
HMARTOR. J 0
KftCDONALD.C E
HACDONAUD. C E,
HMDDHALQ.C E
MACDDNALD.C E
BOO? 14 0043
ao0701057i
6007010379*
0007090061
SQQ7090066"
PR
71-352
71-232
71-387
71-3B7
MACDDNALD.C E
HACDDNAU),C E
MACD-ONALD, C C
MACDDNALD, C E
MACBDNALB.C E
Q007OLO57O
B007010574*
B007110U1
a0071lOl46»
Q007100060
71-384
71-3B4
71-900?
7 1 -90-0 f
71-90S9
MACDtlHALQ, C C
HACDDNAL&, C E
MACDON4LD, C E
MACDQNALD. C E
HAC DONALD, C E
8007020036
GOO 7 0204 9 3
BOO 70203 IB
B007OSOS2H»
0007100100
71-169
71-6144
71-391
71-3B1
71-6400
MAC DONALD, C E
HACDONALD, C £
MACDONW.D, C E
HACDOHALD, C E
rlftCDDNALD, C E
BO 07020 500
800702O30&*
8007020512
BO 070203 I 7*
BO070S03a7
71-9942
71-S94B
71-9016
71-9016
71-9013
MACDdNAU). C E,
KACDONALD. C E
MACDDNAU). C E
MACDPKALD. C E
HACOOMAUD, C E
6007020933*
S 00702 0423
B0070B04Za*
Q0070204Q4
aoo7oaosB3»
71-9015
71-6696
71-669B
71-9022:
71-9O22
MACDQNAL.D. C E
MACOONALD.C E
MACDONALD. C E
HACDQNALD, C E
HAC»ONAt.».C E
8007110265
B0071 10270*
B007 110432
800711046.1"
B0071 I 04 A*
71-6375
71-6373
71-607B
71-6078
71-9130
HACDDNAL&, C E
HACDDNALU, C E
MACDONALD. C E
MACDOHALD.C, E
MACDONALDrC E
8007L1046fl«
80071 10473
60071 1047<bt
8007100040
8007100041*
71-9130
71-3926
71-8926
71-6591
71-A5B1
MA-CDOHALO, C C
HACDONALDrC E
MACDONALD. T H
MACOaNALU. C,E
HACDONALD.C E
00071 102B1
B007110270*
80071 104B1
8007140698
B007140702*
71-5430
71-94SO
50-309
71-346
71-346
H
MACDaKALD.C E
HACBONALD.C E
MACDQNALD. C E
HACDONALD.C E
MAqDONALD. C E
S0071A0706
•0007140709*
9007160310
a007160317«
B007160D22
71-5
71-3
71-391
71-391
71-389
MACDDNALD.C E
MACUQNALt). C E
MACDaNALB, C E
MACDONALD. C.E
MACDOAULD C E
B007160335*
B007I60343
g007160347»
B0072200B9
B007Z20097)t
71-3B7
71-393
71-393
71-9136
71-9136
HACDDNALDiC E
HACDONALD. C E
MACDOMALB, C E
HMDDNAl-D, C,E
HArnnuif o, g E
D007170471
B007170476
8007 170 400
B0071704B3
B0071704B?
71-2
71-82
71-109
71-143
71-179
>. C.E
i.C E
C E
C.E
C E.
S007 170498
BO 071 40381
000714039 J»
600716040^
6007160412*
71-27!
71-1B8B
71-1BBB
71-«86
7 1 -4986
E,
E,
E
E
E
B007 160767
Q007160772*
8007170093
9007170097*
3007330044
71-392
71-392
71-3341
71-8341
«-6W!
E
E
,e
E
E
B007170113
8007170UB*
8007170179
0007100034
Boor iao o as
71-5868
7I-DBta
71-9039
71-3450
71-9080
AUTHOS
ACCESSION
NUMBER
SUBJECT
CATEOOR1
y
MACDONALD, C
MACDONALD. C
MACBQNALD, C
MACDONALD, C
MAC DONALD. C
E
e
E
E
B0072109B3
BOO7B105B7*
80673201 1 S
BOO 7320 129»
6QO7230038
71-399B
71-9998
?1-397J
71-9771
71-5<J79
MAC DONALD, C
MAC DONALD, C
MACDONALD, C
E
E,
E
B007B30040*
0D07240450
80072404971
71-3779
71-251
71-251
MACDOKAUD, C
MACOONALD.C
E
E
6007320039
8O07220O53
71-4697
71-249
MAC DONALD, C
MACDONALD, C
E
E
BO07220067*
800722O00A
71-249
MACDOMALB, C
MACDONALDiC
E
E
BO07 220091
8OO7 220099
71-9070
71-121
MACDONALD, C,
E
8007220106*
71-121
MACDONALD, C.
E
9007220131
71-376H
MACDONALD, C
E
B007220I3S*
71-5768
MACDONALD, C
e
3007220143
71-6387
MAC DONALD, C
E
9007220153*
71-6387
MACDONALD, C
e
8007230047
71-4624
MACDONAtD.C
E
BOO 7230053
71-371
MACaoNALD-C
E
B0073tOOt3
71-173
MAC DONALD. C
E
60O7310015*
71-173
MACDONALD. C
E
80072B0932
71-6698
MAC DONALD C
E.
B0072B0543«
71-669B
MACDONALD. C
E
BOO72B0361
71-9030
MACDQKALD, C
E
B0072S0365*
71-7030
MACDONALD, C
E
6007280575
MACDONALD, C
E
SOO72805BO»
71-70*9
MACDONALD, C
E
600728069B
71-9053
HACDQMALD. C
E
8007280703*
71-7033
MACBQNALO. C.
E
SOO7290116
71-9093
MftCDONALD, C
E
80O7240175
71-383
KACDONALD, C
E
BOO7240179*
71-383
MACD-ONALD, C
E
B007S401B6
71-139
MAC DONALD, C
E
BOO7240193*
71-137
MAC DONALD. C,
E
BOO 7240200
71-9044
MACDONALD. C
E
BOO7240201
71-6294
MACDONALD, C
E
BOO7240207*
71-6274
MAC DONALD. C
E
BOO 72402 12
71-9132
MACDONALD, C.
E
BOO7240215*
71-9044
MACDONALD. C
E.
8OO7240217*
71-9132
MACDQNALD.C
E
B007290016
71-9010
MACDONALD. C
E
B007S9001B*
71-9010
MACDONALD. C
E
6007280718
71-4986
•t
MACDOMALD, C
E
8007380780*
71-4986
MAC DONALD, C
E
BOO7S80762
71-90BO
MAG DONALD, C
E
SOD7SB0766*
7I-70BO
MACDONALD.C
E
Q007290008
71-6566
MACDOMALD, C
E,
900729001 1«
71-6368
MACDONALO, C
E
3007280771
71-7139
MACDONALD, C.
E
8OO7280773*
71-9139
MACDONALD, C
E
8007BB0776
71-6387
MACDONALD, c
E
8007280779*
71-6387
MACH, 8 R
8007310325*
30-327
p
MAC I OLE*. H .
t
8007150712*
50-219
8
MACKENZIE.D
R,
B007Z 10007
RES
MADDEN, W
B007020022»
70-1(43
MADDEN. W
SO 07290 199*
30-244
Q
MADEDA,T J
BO07020211*
50-295
fl
MADEDA., T J
8007240107*
50-263
0
MADEDA, T J
6007280433*
30-346
0
MADISON. A
B007140494*
30-263
0
MAOrSQN. W R
8007K20436*
3Q-33B
R
MADSEtJ, C. L
B004240381
30-867
B
MADSEN, C L
aeon sous
30-2B3
a
KAQBEN. 0. L
8007220177
50-313
a
MADSEWrfl L
3007 1 50003
50-247
a
MADSEN. 0 L
3007190125
50-29B
a
MADBEN.O L
BOO730034?
50-313
a
MADBEN. Q U
3007070020
30-313
H
MADBEN. *. L
8007070172
30-313
Q
MAOBENj 0 L
8007010231
30-267
a
SO071IOOS6
50-283
0
MAOSEN,O L
BO073 10334
30-313
s
MADBEN, O L
6007290331
30-313
S
MADSEN, ff L.
SD0730032D
30-313
0
MADSEH, O, L
8007300327
50-313
Q
MAOEE, M
a 007 140904*
FOIA
MAOROH, R.
S0071001B9*
50-237
8
HAOROM, R
8007S20372*
30-237
8
MAKATURA4 U
MAKEPEACE, J.
MAKEPEACE, J.
NALEK.'F. t>
,M
H
S007030264*
B007U0404"
S007240172*
B0071409B2
50-346
30-247
30-247
PR
S
S
PERSONAL AUTHOR INDEX
443
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
MALLORY, R
90070901661'
NUREO
MALLORY, K
9007090167*
UUREO
MALONE.K
9007030019*
SO-596 H
MALONE, T B
8007090163
NUREO
MALONEY, 0 P
80071603S4
50-319 Q
MALONEY. O P
B007290016
50-316 Q
MAUJNEY. 0 P
9007150696
50-315 0
MALONEYtO P
8007220080
50-313 0
MAUQNEY, 0 P
9007230269
50-315 0
MANCU&Q, F
8007010499
NUREO
HANDLER, J W
6007210602
RES
MANOUBI, J
9007070043
PR
MANN. D C
8007310210
NUREO
MANHV, M
8007110285
50-321 8
MANRY. M
BOO 70 10494
50-366 3
MANRY. M
8007010510
30-366 B
MANRY, M
8007030272
90-366 8
MANRY, M
8007030276
SO-321 S
MANRY. M
8007030260
90-366 S
MANFIY, M
8007020629
90-321 P
MANRY, H
8007030261
30-321 S
MANHY, M
8007030284
50-321 8
MANRY. M
B007020520
30-366 8
MANRY, M
6007030277
50-366 8
MANRY. M
9007020639
50-321 B
MANRY, M
9007110307
50-321 B
MANRY, M
8007110400
90-3S1 S
MANRY. M
8007110429
30-366 S
MANRYi M
8007110304
90-321 a
MANRY. M,
9007 1 1 0433
50-321 8
MANRV, M
8007110366
90-366 8
MANRY, M
9007110368
30-321 8
MANRY, M
8007110455
30-321 8
MANRY. M
SQ0711041S
30-321 S
MANRY, M
8007150939
50-321 8
MANRY.M
900715063S
90-366 B
MANRY, M,
8007280450
50-366 S
MANfiY. M
8007150678
90-366 8
MANRYi M
8007190496
50-321 8
MANRY, M
8007150666
30-321 S
MANRY, M
8007170392
50-321 S
MANRY, M
B007 170392
50-321 a
MANRY, H
9007170403
30-366 8
MANRY.H
9007170431
30-321 S
MANRYr M
8007170481
90-321 B
MANRY. M
8007170453
90-366 S
MANRV, M
8007170414
50-321 9
MANRY. M
8007280678
90-321 R
MANRY. H
80072B0686*
50-321 R
MANRY, M
9007210393
30-366 B
MANRy, M
B0072 10370
50-321 S
MANRY, M
8007210384
50-321 S
MANHY. M
8007210484
50-321 8
MANRY, H
80072B0503
50-366 3
MANRY, M
B007310B27
50-321 Q
MANRY. M
8007240124
90-366 B
MANRY, M
9007220514
30-321 B
MANRYr M
SQ07240165
50-366 B
MANRY, M
B007230411
50-366 B
MANRY, M
8007280448
50-321 8
MANRY, M
80072B0518
50-366 8
MANRY, M
8007290449
30-321 S
MANRY, M
8007280372
50-321 S
MANRYi M
80072B06S9
30-321 8
MANRY. M
80072806B2
90-321 B
MANRY, M
9007300392
50-321 B
MANSER, U C
B007160843*
70- 1M
MANSER i W, C
80070700 1 4*
70-143
MANSER, M C
8007010109*
70-143
MANSER. H C
8007140064*
70-143
MANSER. W C
8007030292
70-143
MANSER, U C
9007020637
70-143
MANSER. M C
8007070191
70-143
MANSER. M C
0007070350
70-143
MANSER, W C.
80072B0552
70-143
MANSER, 14 C
9007290464
70-143
MANSER, W, C.
8007290713
70-143
MARCHAL, J
8007170229
XPOHTUIC
MARCHAL, J
B007240447
XPORTLIC
MARK, R. H
8007220503*
TOPREP
MARKEY, E. -J.
8007 H 0343*
30-332 U
MAROTTA, C R
8007HOS01*
90-320 P
MARRACK. D
8007030025
30-466 0
MARRACK, D
8007030029*
30-466 0
MARRACK, D
8007110080
30-466 0
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEOORV
MARRAM, E P
MARRACK D
MAHRACK, D
MARRANZINO. A P
MARRACK, D
9007 1 ftOWa*
9007160560
B007160S65"
6007160692
8007230552
CONTRACT
50-466 0
50-466 G
50-274 F
50-466 0
MARRONE, J
MARRONE, J
MARRCJNE. J
MARROME, J
MARRONE, J
B0071 10077*
6007110051*
8007110052*
S0071 10057*
60071 10060*
50-320 J
50-320 J
50-320 J
50-320 J
90-320 J
MAHRQNG, J
MARRONE, J
MARRONE, J
MARRDNE. J
HAIiRQNE. J
8007110062*
60071 1006B*
00071 10072*
8007110223*
80071 1022rt»
50-320 J
50-320 J
SO-320 J
50-320 J
50-320 J
MARRONE, J
MARRONE, J
MARfiONE, J
MAftROME. J
MARRQNE, J
B0071 10089*
6007110091*
8007110095*
8007110096*
B007110103*
50-320 J
50-320 J
90-320 J
50-330 J
50-320 J
MARRONE. J
MARSHALL, N H
MARSHALL. E H
MARSH, R J
MARSH, R J
9007110094"
8007160649*
B007300012*
6007170564*
9007290390*
50-320 J
90-329 H
50-320 H
50-553 Q
50-335 Q
MARSHALL, U H
MARTIN, T T
MARTIN, J B
MARTIN. R
MARTIH.W 0,
9007140017
6007210307*
0007230663*
8004240250
6007020017*
50-329 0
90-277 Q
50-10 D
90-327 S
70-1143
MARTIN. H 0
MARTIM.W 0
MARTIN, W 0
MAFITIN.W 0
MARTIN. W 0
8007020008s
S007 100071*
6007180071*
9007240059
8007140644
70-135
90-293 0
70-371
XPORTLIC
70-133
MART IN, R D
MARTIN, T T
MARTIN, W 0
MARTIN, L, E
MARTIN, L E
8007070399*
8007290262*
BOO 7230743*
8007070091*
B007 100346*
90-348 Q
50-293 0
70-1100
50-492 Q
50-498 Q
MAHTINiW 0
MARTIN, T J
MARTIN, W 0
MARTIN, M 0
MARTIN.R D
800703001 S
80072 102B2*
8007020002
B007 170622
9007240291*
70-1143
50-354 Q
70-135
70-135
50-290 Q
MARTIN. W 0
MARTIN. H 0,
MARTIN, T
MARTIN, W 0
MARTIN. T T
8007230301
9007290176
900723039B*
8007 100066
6007230363*
50-2B9 Q
90-244 0
50-309 Q
90-293 0
90-309 0
MARTIN-H 0
MARTIN, W 0
MARTIN. T T
MARTIN, I E
HARTIN.H 0
8007230119
6007230361
9007020540
9007280730*
80072504B6
70-371
50-213 Q
90-271 S
90-482 Q
70-920
MARTIN, J E
MART 1 NT J B
MARTIN, D E
HART IN, D E
MARTIN. R
B007070030
8007230671*
8007290463
8007290470*
600701053B
27-39
50-10 D
PROJ
PROJ
50-369 P
MARTIN, R A
MARTIN. T
MARTIN, T J
MART IN, H, 0
MARTIN W 0
8007010581
600719DOB1
8007310293*
8007 1406 IS
B007 190058
50-2B2 P
50-286 8
50-354 B
50-334 8
70-371
MARTIN, fl
MARTIN, T J
MARTIN, J B
MARTIN, W
MARTIN, W 0
8007170076
6007250299
9007230075
8007230 156
8007260733
so-aea P
30-354 Q
PROJ
50-320 S
70-1100
MARTIN, T
MABON. D 0
MASON. T J
MASON, T J
MASON, T J
800729005B
B007100013
6007010065*
8007010077*
B00721059B*
50-2B6 8
PR
40-2674
40-2674
40-2674
MASON, T J
MASSEY.U E
MATHEWS,E R
MATHEWS, E R
MATHEIJS, E R
8007210569*
80071B0031
8007010036
BQ070SG716
8007020032
40-2674
UUREO
50-303 Q
50-305 Q
90-305 Q
HATHEWBiE R
MATHEHS, E R
MATHEHB. E R
MATHEWS.E R
MATHEWa, E R
B007020256
8007230229
8007110317
80070BOE06
B007080386
50-305 0
90-309 P
30-305 8
50-303 P
50-305 B
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
MATHEIIS, E R
60 07140461
50-305 S
MAT HEWS, E R
B007S4O32I
50-305 0
MATHEWB, E R
8007240334
5O-3O5 Q
MA THEWS, E R
SQ07160544
50-305 R
MATHEW5, E R
B007240415
50-305 Q
MATHEIJS, E R
00071 £0135
50-305 3
MATHEIJS, E R
8007280665
50-305 S
MATHEUS, E R
3007280675
5O-305 3
MATHEWS, E R
€007230414
50-305 F
MATHISEN,R L
BOQ7030352
40-9103
MATSON. V
3007070140
XPQRTLIC
HATSOMi V
3007070145
XPQRTLIC
MAT SOU, V
8007070Q18
XPORTLIC
MATSOMi V
B00711O469
XPORTLIC
MATSON. V
9007110400
XPOHTLIC
MATSON. V
B0071503S3
XPONTLIC
MATBOHi V
B007270Q25
XPQRTLIC
MATSdlJ, V
9007290446
XPORTLIC
HATS ON, V
80072900B7
XPORTLIC
MATSON. V
BOQ7290390
XPdHTLIC
MATT I A, M J
9007020287*
FOIft
MATT I A. M J
3007020292*
FOIA
MATT I A, J 0
G00721033B*
50-352 O
MATTIMOE.J J
B007E4019B
50-312 O
MATTIMDE.J J
B00718Q541
50-312 0
MATTIHOE, J J
80072401 93
90-312 a
MATT I A. J C
80072102 4Q»
50-332 0
MATT I A. 11 J
a007O2039B»
CONTRACT
MATT1MQE, J J
B007250676
50-312 0
MATT I A, M J
8007020731*
CONTRACT
MATTIMDE.J J
30072909117
50-312 Q
MATT 1 A, M J
B007170172*
CONTRACT
MATT1A. M J
B007S40170*
CONTRACT
MATTIA, H J
800725 0562*
CONTRACT
MATTIAiM J
3007O70134*
COHTRACT
MATTlAiM J
B007 100312*
CONTRACT
MATT I A, H J
0007140210
CONTRACT
MATTlAiM J
8007100368*
CONTRACT
MATTIMOEiJ J
G007 100203
30-312 P
MATTIA. M J
3007110539*
CONTRACT
MATTIMQE, J J
90070 8027O
50-312 S
MATTIA. H J
8007180193"
CONTRACT
MATTIMOE. J J
8007300072
PR.
MATTIA, M J
90071 7021 A*
CONTRACT
MATT I A, M J
8007170222*
CONTRACT
MATTIA. M J
BOOT 1 80524*
CONTRACT
MATTIAi M J
9007210113*
CONTRACT
MATTIA, M J
a007ai0333«
CONTRACT
MATT I A, M J
a0072l014D»
CONTRACT
MATTIMOE, J J
B0070B01B3
50-312 P
MATTIMOE, J J
3007300081
PR
MATTIA, M J
EQ07 140521*
CONTRACT
MATTIAi M J
B007 170 12:9*
CQNTHACT
MATTIA, M J
8007170161*
CONTRACT
MATTIMQE, J 0
8007330432
50-312 P
MATTIA. M J
B007170149*
CONTRACT
MATT I A, M J
8007300591*
CONTRACT
MATTIMOE, J J
8007310410
50-312 8
MATTSON-R J
6007020(51
50-339 A
MATTSON.R J
80071 1O*9S»
BECY
MATTSON.R J
6007100456
50-330 H
MATTSQN.fi J
30071 10322*
MISC
MATTSON.R J
BOO 7210176
50-322 A
M ATT SDH i R J
B007230635
50-27S A
MATTSQN.R J
800715D061
FINANCIAL
MATZ.O
BOOJ150Q4Q*
XPQRTLIC
MAURO, C L
8007290056
90-320 H
MAXWELL, L V
8007020373*
50-67 R
MAXWELL. 0 F
S007 100432*
50-413 0
MAXWELL, D R
B00722OIOI*
HASTE MOT
MAXWELL. L V
8007020370
50-67 R '
MAYER, L 0
6007030222
50-2fi3 Pi
MAVER.L 0
800701033S
50-263 P I
MAYER i L 0
8007010351
50-263 F1
MAYER, L 0
60070 1O323
90-263 FF
MAYERi L 0
B0070I0531
50-263 S'
MAYER. L 0
80070 1O3 It
50-263 F
MAYER.L 0
9007010376
90-306 P
MAYER. U 0
BOQ70103B1*
50-306 P'
MAYER, L 0
B007010524
50-306 3>
MAYER, L 0
BOO7100133
50-236 F,
MAYER. L 0
60O70B0291
50-243 P
MAYERi L 0
0007100067
50-263 P
MAYER >L 0
8007100190
50-263 a,
MAYER. I. P
B0070BQ265
SO-S63 P<
444
PERSONAL AUTHOR INDEX
AUTHOR
ACCESSION
NUHBEH
SUBJECT
CATEQCJR1
Y
HAYER , L D
MAYEfl.L 0
MAYER, L 0
MAYER, L 0
MAYER, L 0
B007210186
B0072QOOS6
B0071S-0491
B007110H5
6007150611
50-263
71-9019
50-332
50-332
90-263
P
Q
F
R
HAYER, L O
MAYER, L O
MrtYER.L O
MAYER, L 0
MAYEflfL 0
800716055B
8007)70398
0007210379
Q 0073 10437
9007160300
50-282
50-263
50-306
50-282
50-263
R
P
3
5
P
MAYER. L 0
IWYER.L a
HAYER. L 0
MAYER, t. d
HAYER. L 0
B0072fl04rtl
B0072B03B1
B0072B0410
8007Z804BB
9007290669
50-263
50-263
50-263
30-363
30-362
F
F
P
F
B
MA/3, S £
HAYS, S
riCHREARTY, R ft
MCUfllBE.A F
HCCrtBE, E
8007230172
B0070Q0305"
Q0072 10209*
BOO 72 50552*
8004240212
50-334
30-409
5O-410
9O-460
•30-296
P
a
5
MCCABE. E
HCCABE.E C
KCCABE.E C
KCCANM, H
8004 2402 15
8007 330736"
8007 230 174 »
6007310247"
B007I70037"
50-318
50-277
50-334
50-317
30-206
S
0
a
a
H
MCCARTNEY, R 11
HCCARflEL, S F
HCCARREL.8 F
MCCAULEY,3 K
MCCLAINiC K
6007020633
800701 04 IB
B007 300333
8007330513
BOO 722036 4"
30-320
50-344
50-344
50-10
30-219
H
p
G
D
R
MCCLINFOCW.R 0
MCCLIUrOCK.R D
MCCLIIITDCSt.R 0
HCCLINTOCK.R D
MCCLIHTGCK.R 0
G007170337*
0007170345*
6007170341*
8007170349"
B007170407"
70-1869
70-1B69
70-1B69
70-1869
70-1969
MCCLIMFGCK, R 0
MCCLINroCK.R 0
MGCLIIITOCK-R Q
HCCLIHTdCK.R D
MCCLlriTOCK, R 0
8007170292*
8007170306"
7813210553
8007170304*
BO 07 170432*
FOIA
FOIA
PT9
FPIA
FOIA
MCCLlNTOCX,iR 0
MCCLINTQCK, fl 0
MCCLIWTOCA, R D
MCCL1HTOCK, R 0
MCCLINTOCH.. R D
BO 07 170399"
B007170U1*
6O0717C314*
8005090527*
BQ0728Q334
FOIA
FOIA
FOIA
PT9
40-3329
MCCLIIJTOCK., R 0
MCCLtNrOCK, R 0
MCCOLLQUGH, II D
MCCOULOM.K A
HCCOMNELL, J U
80071S0335*
8005090523
B 0071 30016
8007290789
800724(1060
70-3631
PT9
RES
50-344
50-367
0
F
MCCaRKLE.O W
MCCORKIE, G U
HCCQRKLE.O H
HCCORKLE.O U
HCCOflKLE, 0 W
8007240072
B007240080
8007020344
8007020903
8007 I 40598
70-751
70-1253
70-1193
70-1739
7O-135
MCCORKLE. G H
MCCORHLE, 0 U
MCCGRKLE, G U
HCCQRKLE.Q U
HCCRACKEN, « W
3007240076
B0072 30648
Q007310452
8007310475
8007220515*
70-734
7O-27
7O-25
70-25
50-34B
P
KCCSAY.J 0
HCCREEHY, 0 E
J1CDGNA1-D, R P
HCDQUOALL.A J
HCDOUGALL. A J
B007030133
8007230045
B0072B0052
6007170172*
8007 3401 7 3*
PR
RES
PR
CONTRACT
CONTRACT
MCDOWELL-BO YEfl
MCDUFFIE, (1 h
HCDUFFIE.H A
MCDUFFIE.H A
HCDUFFIE.H A
BOO 702042 7
BOO 72202 1 0
80071SOS33
8007220456
RES
30-400
50-400
50-400
SO-400
A
a
A
A
MCDUFFrE.II A
HCEUWJEY, 0 L
NCELHA^EY. 0 L
MCELHAIJEY.D L
HCELHURRY.B R
800 7280 5 07
60O7140379*
80071404160
SO 07 1607 55*
8007100332
30-400
TOPREP
TOPREP
TOPREP
PR
R
MCFARLAND, J E
MCGARHV.O 11
MCGAftaV^J H
HCOAftRY. J H
HCOAffRY. J M
G007230160*
8007140-243
8007240140
8007140004
6007140004
QA999
FQIA
PR
50-369
50-369
a
0
MCOARRV. J n
MCCAUOUY.R W
MCflAUOHY.R W
MCCAUOHY.R W
HCiflAUOHY.R W
6007290387
8007100014*
8007310338*
BOO? 170662"
80070 1 0333*
PR
50-320
90-352
50-354
50-443
a
AUTHQF!
ACCESS10M
HUKBER
SUBJECT
CATEODR'
^
MCOflUGMY.R U
MCGAUSKi'.R II
HCGAUOHV. J P
MCGAUQHY.R W
MCOAUCHY. R W
9007210355"
9007210509"
3007 1 60866*
Q007 170599-
6007210540*
90-337
90-410
50-416
50-363
90-352
a
Q
Q
a
Q
MCQAUQHV,J P
MCQAUQHV, J P
HCOAUOHV, J P
MCGAUQHV.J! U
MCOAUGHY, H W
Q007 170592
S0071605B3
80071606*2
B00717Q271*
Q00717033E3*
30-4 1 6
50-416
30-416
90-334
50-322
s
s
s
0
a
MCOAUQHY, J P
MCCAVI3HY. J P
HCOAUQKY, J P
MCGAUQHY.H W
MCOAUSHY, H W
B007020&79
S007O20640
8007160611
8007170257*
Q0071BO561*
50-416
SO-41A
50-4tfi
SO-3B7
50-410
B
B
3
0
Q
MCOAUQHY.R H
MCflAUQHY. J P
MC8AUGHY, J P
IlCCAUOHf, J P
MCOAUO&m J P
0007210545*
90061 9OS7 7
B0070B0601
Q007160B62*
B00702053B
50- 423
50-4t6
30-416
50-416
30-416
0
S
s
a
B
MCffAUGHV, J P
MCUAUOHY, J P
HCQAUGIW, J P
HCOAUOHr, J f
HC0AU0HV, J P
B 007020630
B 00707 (J29D
B0071I0413
B00711043O
B007 150093
30-416
SO-416
30-41*
50-41A
30-416
8
B
S
B
S
HCOfiUOHV. J P
HCSAUOItV, J P
HC3AUQHY, J P
HCQAUGHY, J P
HCQAUOHV, J P
8007150099
00071 SOIOS
B007 170396
8007170290
6007170^33
SO-41A
50-416
50-416
50-416
50-416
8
S
S
S
&
KCOAUOHV, J P
MCQAUOMV. J P
MCSAUOHV, J P
MCOAU8HY, J P
•HCQAUOMYr J P
800722038 B
B0072203B9
8007230432
8007390510
80072B05i6
50-416
50-416
50-4 1 6
50-416
30-416
3
B
a
3
S
rtCOAUOHY.J P
MCOAUOHV.J P
MCGAUOHV. J P
HCQAl/OHY, J P
MCOMJCHY.J P
9007 3906 5S
8007290666
9007290671
S007al?071fl
3007290791
50-416
50-416
30-4 1 6
30-4 1 6
50-416
3
3
B
B
3
MCQOLDR1CK, F F
MCGOVERN, J J
MCOflAY, J 9
MCGREGOR, L O
MCOREW, J U
B0071SOO74*
(3007210293*
6007130140
B0072 10327*
B00701024O
BECY
70-6B7
PR
30-346
71-4838
Q
MCCREU, J U
MCCntFF. J M
MCGUIHE.D H
HCOUIRE,J P
MCOUIREjP J
6007010245
B00715t)5B5»
BOO731'033S"
SOO7010540
800707 0-37B
71-9030
50-327
30-389
50-293
30-293
8
Q
8
B
MCOUIRE, F J
MCGUIRE, P J
MCCUIfiE.P J
MCGUIRE.P J
MC<9UIRE,P J
BO 07030287
BO 0707 0357
B0070B01S2
S007080f96
B-0070Boa02
50-293
50-293
50-293
50-293
30-293
S
8
B
B
B
HCCUIRE.P J
HCCUIRE.P J
HCOUIRE.P J
HCKENZIE, L
HCMDDEM, J C
B 007 160641
B007 130393
8007150699
8007310004
0007030366
50-293
S 0-293
50-293
HUREO
30-186
6
P
R
B
MCKIBBEN, J C
IICKIBUEN, J C
HCKIWEY, R D
KCLOUOHLIN. M T
MCLOUQHLIN'H T
80070 11026 0
B007 140351
Q007E300&1
8007O10545*
8007070382"
50-lBfe
50-106
40-B745
50-293
50-293
S
3
B
S
MCLOUOHLIfl. M T
J1CLOCOHLIH, M T
HCLOUCHLltJ.M T
HCLOUOHLIH.il T
MCLOUC-HLIN.M T
3007070389*
8007030289"
B007OS0200"
B007OS0205*
80071 406 19»
50-S93
30-293
30-293
30-293
50-293
B
a
8
a
B
MCMASTER.C F
HCNAHARA, A
HCNEItL, W »
HCPHILLIPB. J
MCPHILLIPS.J L
6007 L 400 29
8007 1 SO 590*
0007160411*
8007110003
8007110-053
50-299
30- 3:41
OA999
70-2909
70-2909
H
R
MCPHILLIPS. J L
MCUETHY.P J
MEANB, D S
MEBUS, C F
MECKHHOj M
S007 110059
BOO 7 160227"
B00703030S
600-7230686
BOO5070S13
70-2909
MI8C
50-322
50-320
50-320
A
H
H
MEDLQCK.R L
MEOROW.L ft K
HEIER.M O
HEINCKE, J A
MEIB8, R 4.
9007240007
B00717O132
6007300563
B00711O409
8007100152
30-B4Sa
CONTRACT
PR
30-EB3
PRDJ
R
A"J FHDR
ACCESSION
NUMBER
SUBJECT
CATEOORV
MEKBEL, C
MEULINOER, C 11
MELQTT, R f.
HENARO, H 14
HENARO, H a
8007180566*
3007140013
BOOT 150 166
BOO7030193
Q007SB0034
SO-346 B
SO-2B9 H
PR
PR
PR
MENHICKEN. J Q
HEdR I WEATHER, N
HERRILL. J A
MERBDH, B D
MERSON, 8 D
3007190036
S0071B0275"
B007320OI9
8007010390*
8007010392*
XPORTLIC
50-393 0
HURGO
50-317 D
30-31? R
MEKBDN'8 D
MERBON.e n
MERBON. S D
MESBINOE.R, H
MES6ITT, B R
B0070I03B9
8007320331
60072203 53*
BOO7100O13*
90O7160B30*
30-317 R
UO-317 R
50-317 ft
70-143
90-339 d
ME83ITT- 9 R
MEYER, H D
MEYER.fi Q
MEYEH.R 0
MEYERS, 3
8007170429"
BOO70 10082*
(3007010194"
BO 070 102 10*
9007100024
50-324 a
FOIA
FOIA
FOIA
PR
MEYER, K A
MEYERS. C W
MEYER. J F
MEYER. J F
MICHEL, C J
60O7030007
BO 07 11 0578*
00 070 10608
8007230&46
SO07 130520*
FOIA
CONTRACT
30-247 P
80-247 P
70-143
MICHEL. C J
MICHEL.C J
MICHEC.C J
MICHEL.C J
MICHELiC. J
G0072B0194"
BOO7010101
6O07010121*
8007070333
H0071B0475
70-143
7 I -97 68
71-3769
70-143
71-249
MICHEL.C J
MICHEt, C J
MICHEL, C-J
MI DURA. H J
MICEHAM, J
6007150563
S007I5Q518
8007290547
B 007 1 SO 596
BOO7U0139
70-143
70-143
70-143
50-273 R
FOIA
MILHISER.R J
MILLER, J 0
MILLER, J, 0
MILLER, J,
HILLEft, J 0
9007080339"
3007110023*
90071 10020»
aOO7HO024*
BOO711O013*
30-302 8
70-1333
70-1333
70-1333
70-1333
MILLER, U H
MILLERrD S
MILLER, T
MILLER- D W
J1ILLCR.H J
9007100413*
a00703O099»
BOO7140034
BOO7090409
QOO7020148
50-384 a
PR
50-323 H
REOOD
HASTE MOT
MILLER, L C
MILLER, W H
MILLER, L.
KILLER. R U
MILLER. R B
3007250097*
BOO7100131*
B007170579"
BO 073 10253
000714O379*
QA999
50-369 a
50-206 fl
HUREO
TOPREP
MILLER, R: B
MILLER. R B
MILLER, H 0
MILLER, H D
MILLER, H *!
B007140416*
B00716075S*
B0071105BO
B00702O291
0007170583
TOPfiCP
TOPREP
30-313 P
50-267 P
40-B3BO
MILLER, J R
MILLER, J.fi
MILLER. J-R
MILLER, J R
MILLER, W O
BO07020169
8007030174*
0007020490
9007020493*
8007020250
50-190 P
50-150 P
30-193 P
30-193 P
40-4492
MILLER.H.O
MILLER, J R
MILLER, J R
HILLER, J R
MILLeR.H J
B007030228
8007140630
B00714063?
8D07250493*
B00723D161
70-1113
TQPREP
TOPREP
TOPREP
40-8714
HILLER.D E
MILLER, T B
MILLER, J H
MILLER,!) S
MILLER, D S
8007310513"
9007070382
SOQ7 U0274
B007020607
0007020610*
90-293 Q
50-32? 0
50-463 A
50-309 0
50-30? 0
MILLER, D S
MILLER. D S
MILLER, J 0
MILLER, M I.
MILLER, M I
8007020607
B007030610*
3007250117"
BOOV020462
BO 0702 0462
30-309 0
30-307 0
CQMdIBBION
50-399 0
30-597 0
MILLER, K L
MILLER. J R
MILLER, J R.
MILLER, J R
MILLER. M I,
00 07 14 0006
Q00719002B
00071S0035*
B0071S0041*
BOO 709004 9
50-320 T
30-IB4 P
SO-1B4 P
90-184 P
30-339 8
MILLER, M I
MILLER, U O
MILLER, U 0
MILLER. W 0
MILLER -W D
8O07090045
B00721003?
BO07210041
B 00721 0043
H 0072 10031
90-329 0
70-143
71-59BO
71-9019
TPPREP
PERSONAL AUTHOR INDEX
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
MILLER. W 0
8007180503
70-8
MILLER, H 0
B0072 10039
70-824
MILLER, H 0
B0072 10057
90-293
P
MILLER, H J
B007B30279
40-8200
MILLER, J fi
B007220134
TOPHCP
MILLER, D B
80072B0041
50-329
A
MILLER, W O
B007170621
70-734
MILLER, M 0
80071B0076
50-317
P
MILLER, W 0
B0071B0104
90-269
P
MILLER. M 0
90071B0109
30-244
P
MILLER. M D
B0071B0113
SO-219
P
MILLER. H 0
B00721O074
70-607
MILLER, W 0
Q0072 10097
70-27
MILLER. W 0
Q00723OOS2
50-269
P
MILLER, M 0
B007230057
50-244
P
MILLER, U 0
B00733OI16
50-329
A
MILLER, H 0
900729O707*
50-329
A
MILLER, H J
SOO 7230630
40-8727
MILLER, D B
BOO? 11 034 5
PR
MILLER, D 6
80071 1O349
PR
MILLER. 0 E
B00719O619
30-326
ft
MILLER, 0 E
B00719OA20*
30-326
R
MILLER. M I
B007140020
50-329
0
MILLER, M I
B00714O020
00-329
0
MILLER, J R
SOQ72B0699
50-264
F
MILLER, L K
S007190604»
30-272
R
MILLER, W 0
S00721OOB9
70-1257
MILLER. U 0
8007210094
70-364
MILLER, M E
B00729O7B9
50-344
0
MILLER, U D
B00729OSBO
70-25
HILLER.lt 0
B0072B0064
30-315
P
MILLER, M I
8007220194
50-329
0
MILLER, M 1
8007220194
50-329
0
MILLER, H 0
8007250137
40-B594
MILLER, M E
8007220500
30-449
M
MILLER, W 0
600723O081
90-54
F
KILLER, M 0
80072B0377
40~i622
MILLER. W D
80072B02B2
70-1143
MILLER, U 0
B0072B0564
40-86 Bl
MILLER. M I
9007230910
50-259
0
MILLER, M I
BOO 73303 10
50-259
0
MILLER. D 8
80O730O1S2
50-309
0
MILLER, D S
80Q730Q127*
90-309
0
MILLER, D. B
8007300122
90-309
O
MILLER, D B
8007300127*
90-309
0
MILLSAP.H J
8007030370*
70-1201
MILLS, L. H
80O707026S
50-299
P
MILLS, L H
80O711O039*
50-327
a
MILLS, L H
B007070042
40-1341
MILLS, L M
B007020347
90-327
0
MILLS. L M
B007020499
SO-259
a
MILLS, L. M
B0072B046B*
90-2S9
a
MILL8.L K
8007020619
50-390
8
MILLS, L K
B007160971
50-328
8
MILLS, L, M
S007170664
50-328
S
MILL6,L M
6006350275
50-919
S
MILLS, L. M.
S007140240
PRM
MILLS, L M
SOQ70104S6
90-43B
A
MILLS, L M
S0072505S5
40-1341
MILL8.L 11
8007240279*
50-3 IB
0
MILLS.L M
8007010327
50-337
P
MILLS, L. M
B0070 10339
50-518
A
MILLS, L M
BD070103B&
50-3E8
A
KILLB.L M
B007020S43
90-328
8
MILLS, L M
8007020344
50-328
B
MILLS, L M
B007020627
90-327
a
MILLS, L M
8007180523
30-239
Q
MILLS, L M
8007080220
90-327
a
MILLS, L M
8007100232
50-3S3
B
MILLS, L M
8007080236
30-209
P
MILLS, L M
B0070S0331
50-327
Q
MILLS, L M
8007100205
50-43B
a
MILLS.L, M
B0071O0233
50-433
B
MILLS, L M
B0070B0253
90-390
A
MILLS, L M
8007030360
50-259
P
MILLS, L M,
S0070903SS
90-390
V
MILLS.L. M
80O70?0222
50-390
S
MILLS.L M
80071 00 U9
50-438
0
MILLS.L. M
800722023i
50-518
a
MILLS, L M
8007090249
90-327
8
MILLS, L M
BOO71O0209
90-43B
B
MILLS.L M
B007110320
30-318
8
MILLS, L, M.
BOQ7290927
PR
MILLS, U. H
B007I40349
30-318
S
MILLS.L H
BOO7I40422
30-390
S
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
MILLS.L M
B007t5O472
SO-327
P
MILL9.L M
B007I6O643
50-327
F
MILLS.L K
B00714O443
50-328
S
MILLS.L K
B007160650
50-439
5
MILLS, L K
9007160666
50-33B
S
MILLS.L M
9007210091
SO-259
a
MILLS, L 11
800723O726
50-259
0
MILLS.L H
800728-0615
50-259
0
MILLS,L H
B007150546
50-439
A
MILLS.L 11
B007150551
50-438
A
MILLS.L M
B007150i40
50-327
P
MILLS.L 11
QOO7I 50692
5O-327
P
MILLS.L 11
SO 07 160424
50-438
9
MILLS.L M
8007210036
5O-327
a
MILLS.L <1
8007210996
50-327
0
MILLS. L H
B00719052I
50-327
P
MILLS.L M
BO07160473
50-366
8
MILLS.L M
B-00723025S
50-566
S
MILLS.L M
BOO7300003
PHM
MILLS.L M
8007170272
50-390
a
MILLS.L M
S 007 170342
50-966
s
MILLS.L M
B00717O396
50-96A
B
MILLS.L M
6007130571
30-327
P
MILLS.L M
6007 150659
50-566
S
MILLS, L M
e0071(,0471
SO-327
P
MILLS.L M
QOO7170513
&0-390
8
MILLS.L H
8007170591
50-390
6
MILLS.L M
8007310355
50-239
0
MILLS.L M
6007170560
50-260
P
MILLS, L M
8007220376
90-239
P
MILLS.L M
8007230445
50-299
S
MILLS, L M
80O7230487
50-390
s
MILLS, L M
8007230582
50-390
•a
MILLS, L M
9007310056
50-327
•a
MILLS.L H
B00722O922
50-259
Q
MILLS.L 11
8O0723043I
50-328
3
MILL8,L M
80073 1020B
50-239
a
MILLS, L M
8DO7220460
50-327
A
MILLS,L M
8007330532
50-327
P
MILLS.L M
8007230494
30-328
a
MILLS.L M
800723O499
50-327
F
MILLS.L M
B007230467
30-327
P
MILLS.L H
BO07230477
30-327
P
MILLS.L M
BO072304BO
30-327
P
MILLS.L M
8007230486
50-32B
8
MILLS,!, M
8007230505
50-390
S
MILLS. L M
9007230311
30-327
A
MILLS.L M
8007230528
90-318
5
MILLS.L M
6007230533
50-327
P
MILLS.L M
BOO 7330587
50-390
8
MILLB.L M
8007300572
30-259
Q
MILLS. L M
9007230408
90-327
P
MILLB.L M
8007230979
50-327
F
KILLS, L M
8007290479
50-327
Q
KILLS, L M
BC-07380660
50-43B
S
MILLB.L H
BO07290724
50-327
P
MILLS,L M
00072B054B
50-327
F
MILLB.L M
8007290632
30-3SB
B
MILLS, L M
9007290729
30-438
B
MILLS, L M
SO 0729 07 49
50-433
B
MILLS, L M
8007390913
50-390
a
MILLS.L M
800728049B
SO-327
0
MILLS.L M
B007280633
30-327
P
HILLS, L M
8007290679
90-327
P
MILLS, L M
8007290757
50-327
P
MILLS.L. M,
0007300434
50-327
F
MILLS.L M
B 0073 1 0396
50-337
P
MILLS, L M
BO073104I3
90-327
P
MILLS.L M
B 0073 10323
90-327
P
MILLS, L H
80073 104 11
SO-3E7
P
MILLB.L M
BO07310416
50-327
P
MINARICK. J U
B 0072 30992*
50-460
A
MINECK, D. L
G 0073 30233
90-331
P
MINECK, B L
6007030212
30-331
B
MINECK. J> L
B007O30224
30-331
S
MI HECK, D L
9007030239
30-331
S
MINECK. D L
90071 10411
50-33 t
S
MINECK. 0 L
3007110471
30-331
s
MINECK. D L
S007220599
50-33 i
3
MINECK. D L
9007230484*
50-331
P
MINECK, D L
90072S0497
30-331
S
MINECK, D L
S007220367
30-331
R
MI NECK. D L
BOO 7220394
50-331
P
MINECK, D L
8007230482
50-331
P
MINECK. D L,
9007230464
50-331
B
AUTHOR
ACCESSION
NUMBEff
MINER. L E
MINER. S
MINER. L E
MINNER3, H
MINQOUE, R D
MINC30UE, R D
MINOGUE, R D
HINOGUE. R B
HINDGUE, R B
MINOGUE, fl B
MINDQUE. R B
MINOR, O C
MINTZER.D
HI9HIHA, J
MI SHI MA. J
MITCHELL, W
MITCHELL. D 0
MITCHELL. D O
MITCHELL. D O
MITCHELL. D G
MITCHELL. D Q
MITCHELL. D O
MITTL.R L
MITTL.R L
HITTLiR L
MITTL.R L
HITTL.H L
MITTL.R 1-
MITTL.R L
MIYABAYASHI. M
MIYABAYAEHC.M
M1VASAKI.D H
M0SENQS, L
MDEOLING.J B
MOFFETT. T
MDFFITT.A E
MONBaiBBE.H M
MQNBCllSSE.R M
MQNDOISBE.R I\
MDNBOISSE.R M
HONTAOUE. P
MONTAGUE , P
MONT 1,11 A
MOODY, E E
NODDY, D E
MOODY. C J
MOGDY.D E
MOODY. D E
MOODY.J H
MOODY, D E
MOODY, D E
MOODY. D E
MOODY. D E
MOODV. D E
MOON. H T
MOON, C U
MOON, C II
MOON. C W
MOON. C M
MOOM, C H
HDQNrC M
MOONEV.R R
MOORE. V A
MOORE, V A
MQORE, D E
MOORE. » E
HOORE, O K
MOORE, 0 H
MOORE, J 8
MOORE, 0 C
MOOHE, O C
MOORE, N
•HQORE. 0 C
MOORE, J E
MOORE, J E
MOORE, V A
MQHOAN. H- E
HORIARTY. J M
MORIAHTY.J H
MORIARTY.J M
MORIARTYj J M
MORIN, J P
MORRISON, J Ft
MORRIS. D
MORRILL, P J
B007250012*
B00701O546
B00724025B-
B00739O771
B007 160694*
H007070S9B
B007350019*
B007090015
B00714O576
B007I4O055
BQ0717O6Q1*
B00729OB09*
B00709O186*
800721O315B
800723O19B
B007070296»
B007O7O313*
BOO 7080214*
80071 6O526*
8007160623*
ao07290905n
8007070285
8007030161
8007O30229
8007030244
8007160638
B0073102I9
B0072103B9
B0072S0559
B0073 10029
8007140092
8007100131*
800710032B
8007110363
H007 150004
8007100254
B007 100297"
9007100254
9007100397*
90072203S6
8007300323
B007 1 3O669
B007 1 90090
B00701O057
90071705B2
9007140030
B00721O506
8007140403
B007090233
B007250273
8007280425*
SOO 72400 10
BOO7300397
8007300404
9007300423
8007300424
B007310312
9007130199
8Q07O70053*
S0070700S5*
BOO707O005*
BOO? 10 0093*
8007030546
80070209470
B0072102B7
S 00708 0079
B007190484
fi007220t07
8007150369
8007190711
B007 170354
B0072905HS
9007280218
S007090270*
8007090273*
8007010159
9007010397
S007 £30398
B007Z10047*
B007010S67
B007 170068*
SECY
10CFR
SECY
SECY
PR
PR
PR
PR
Pft
446
PERSONAL AUTHOR INDEX
AU THOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
MORRILL, P J
MORRISON, 11 J1
MORRIS. R H
MPRRDW. D
MORROW, D
B007300525*
B00730DOOS
8007310397
8007070120
B007O70115
50-344 0
ORB
50-275 A
4O-B5Q2
4-0-83BQ.
MORROW, D
MORROW, D
MORROW, D
MORROW, 0
MORROW. 0
S007O20083
B00702043-3
8007020064
0007030219
Q007210066
40-B497
40-B721
40-8697
40-S3BO
40-9502
HOFffiOll, D
MORRDU, D
MOREfOU, D
MORSE, W T
MOHBE, ft K
S007210063
B007880054
S007280303
3007140407
0007280659*
40-8697
40-8502
40-8502
90-443 0
S 0-409 Q
MORSE, A K
MORSE, A
MORTON. K V
MOflTOM, K V
MORTON, R V
9007310101
8007280696
80072102A7*
3007O10627*
80Q7Q30009*
50-409 0
50-409 0
CONTRACT
CONTRACT
CONTRACT
MORTON, K V
MORTON. K V
MORTON, K V
MORTOM. K V
MORTON, K V
9007030029*
8007O20533*
9007O10619*
8007210259*
8007300598*
CONTRACT
CONTRACT
CONTRACT
CONTRACT
CONTRACT
MORTON, K V
MORTON, K V
HOSDY.M R
MOBEteY, N C
MOBELEY, N C
8007310010*
8007230573*
8007230194
8007150773*
80071 10555
CONTRACT
CONTRACT
fiES
QUO
50-315 P
MQ5ELCY. N C
M05ELEY, H C
MOSES, V R
M05ZYNSKI. J R
MOWflY.W R.
Q007 290051
8007350480
B007 1 00090
6007150066
B0070200B4
50-272 S
S 0-266 P
Ffi
RES
XPORTLIC
HROCZKA, E J
MROCZKA. E J
MROCZKA. E J
MROCIKA E J
MRQCZK.A, E J
B007O10443
B007O70318
B007O703A1
6007100157
B007100167
50-336 S
S 0-336 S
50-336 B
50-845 S
SO-24B S
MROCIKA, E J
MflOCIK.0, E J
MROCIKA. E J
MROCIKA, E J
MROCIKA, E J
B007 1 1 O466
B0071B040S
8007 1 60676
B0072 10374
6007180293
50-249 B
50-245 R
50-249 R
50-336 R
50-249 8
MROCIKA, E J
HROCIKA, E J
MUCHNICKI.E D
MUCHNICXI.E D
MUDREY, M 0
8007250409
8007270697
800*110406
9007100246
8007140402
S 0-336 S
50-245 Q
PR
PR
PB
MUELLEH, E H
MUENCH, 0 \4
MUIft.H S
MUIH.H B
MUKSIEft JEE. H
9007010133*
8006300363
80D7310490*
B007310-1B9
8007020135*
Etita Prog
S 0-536 A
XPORTLIC
XPORTLIC
HASTE HOT
MULtER, D R
MULLER. H
MULl-Efl.L L
MULLER, R E
MULLER, D R
8007250063
8007150040*
8007290B82
8007160302
B007240046
50-320 H
XPORTLIC
XPORTLIC
XPDRTLIC
30-445 A
11UN1B
MUNRD, J J
MUNRO, J J
MUNTZIN9,L M
MUNTZINO,L M
9007180470*
0007030375
8007100373
000702027&
B0070S0862
71-9136
71-9039
71-9093
BECY
SECY
MURDOCH, L. T
MURPHY, C E
MURPHY, C E
MURPHV, C E
MURPHY, C E
8007210170*
60071608*9*
8007tOD3G4*
60071 EOS27*
B0071OD423*
40-4492:
50-416 Q
90-324 0
S 0-424 0
50-413 Q
t
t
1r
50-333 0
SO-400 Q
50"3B9 Q
90-384 Q
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEOORY
MURPHY, C E
MURPHY. C E
MURPHY, R
MURPHY, C E
MURPHY, C E
0007290344
8007290409
S 00 7070 178
9007300589
8007100412
SO- 430 0
50-434 0
PH
50-518 0
50-400 0
MURPHY, C E
MURPHY, C E
MURPHY, C E
MURPHY, C E
MURPm.C E
8007100417
B 007290123
80O7310240
8007070097
8 OO7 100396
50-413 Q
50-366 0
50-416 Q
90-333 Q
50-3S4 0
MURPHY, C E
MURPHY, C E
MURPHY, P H
MURPHY, W P
MURPHY. W P
8 007110034
QQO7I 10515
80O7070316
800701031 7
0007010371
50-327 0
90-424 0
50-255 0
90-271 8
50-271 8
MUHPHY, W P
MURPHY, W P
MURPHY. H -J
MURPHY, E S
MLJHPHY, M J
8007010403*
B 007070260
BOD70BOSBO"
BOQ72403B3
3007080426*
50-271 B
50-271 B
50-272 8
NUREQ
SO-272 S
MURPHY, C E
MURPHY, M- J
MURPHY, C E
MURPHY, C E
MURPHY. M J
B007160B60
8007100202*
9007180189
9O073IQ493"
9007130317*
90-416 0
30-272 8
50-353 Q
30-270 0
30-272 S
MURPHY, M J
MURPHY, M J
MURPHY, C E
MURPHY, C E
MURPHY. M J
BOO? 190628*
B007 130679*
B007240265
B007200126
B00717O448*
50-272 8
50-272 S
30-918 Q
30-321 0
50-311 S
MURPHY. H J
MURPHY. M J
MURPHY. M J
MURPHY, H
MURPHY, a
B007220302*
B00722D627*
B0072 10507*
B0072304BS
B007230409*
5O-272 S
SO-272 S
50-272 B
30-271 8
30-271 B
MURPHY. P H
MURPHY, P M
MURPHY, H 0
MURPHY, C E
MURPHY, M J
BOQ723QB10
9007230810
B00729Q632*
900731 O2 IS
B007S9Q711"
50-859 0
30-253 0
30-311 8
50-399 Q
50-311 S
MURPHY, M J
MURPHY, M J
MURRAY, J P
MURRAY, T D
MURRAY, T. D
BQ07290729*
SQO7290S44*
80O73Q0370*
3007010434
9007030260
50-278 8
50-272 B
90-266 0
30-346 S
30-346 S
HURRAY, T D
MURRAY, T. D
MURRAY, T D
MURRAY, T D
MURRAY,! D
90O7 150609
9007110427
9007110371
8007110407
3007110418
S 0-346 S
30-346 S
90-346 8
30-346 S
30-346 S
MURRAY, T D
MURRAY, M J
MURRAY, M J
MURRAY, T D
MURRAY. M. J
8007 11 0440
9007140432
8007140439*
8007140318
B0071 90036
50-346 5
PH
PR
50-346 R
50-367 0
MURRAY, T. D
MURRAY,? D
MURRAY. T. D
MURRAY, T. D,
MURRAY, T D
3007190560
5007240124
B007170441
B007220375
9007220459
50-346 B
30-346 B
50-346 0
50-346 S
50-346 S
MURRAY, H 0
MURRAY, T. D
MURRAY, T »
MURRAY, T. D
MURRAY,? D
3007290442
9007280976
BOO 7380971
B007290630
BOQ7200SB3
27-39
50-346 8
50-346 B
50-34* B
30-346 S
MURRAY, T. D
MUSE, L A
MUSOLF. D.
MYERS. H
MYERS, F S
B007280609
B007 100347
BQ070103B3*
9007230569*
8007010037*
50-346 8
71-3B7
50-282 P
50-320 U
OA799
HVERS, t L
MYNATT. F R
MYRABO, A L
MAIDU,K R
11X11M, a (]
90071B0022*
8007140307
9007150614*
9007110477*
8007170639*
Bt»t» Prog
REB
90-263 R
50-358 Q
50-327 fl
900731022$
9007290460
9007290467 »
8007110326*
90070B0370*
NUREO
XPORTLIC
XPDRTLIC
30-30S 8
30-303 8
S007 160474*
B007160902"
9007160310"
BO072B0674"
90072B060g»
3-0-305 B
50-309 B
30-309 6
30-309 8
90-303 S
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
NAPUDA, 0
NAPUDA, 0
NAPUDA, 0
NARBUT. P P
NARFIOH, L
8007100101*
8007170692*
8007230137*
SQQ7180018*
8007170399"
30-293 Q
30-219 Q
30-289 Q
50-206 Q
50-363 Q
NARROW, L
NASH, D
NAUCHTON.W F-
NAUGHTON.W F
NAUCHTON.W F
B007 170288"
0007250699
0007160627
B00701042B
0007010411
50-322 Q
50-482 M
50-379 C
50-27S P
30-454 A
NAUGHTON.U F
NAUGHTON, U F
NAUQHTON.W F
NAUOHTON.W F
NAUQHTON,H F
8007010211
8007020400
6007020631
B007000299
8007 1 60S S9
30-295 P
90-434 K
30-434 0
90-434 K
30-434 K
NAUOHTDN.W F
NAUGHTON.W F
NAUGHTON.W F
NAUQHTQN.W F
NAUQHTON.H F
60071 S0476
8007390676
8007140320
8007220S40
8007280603
30-295 P
50-494 K
30-434 K
30-434 K
30-293 P
NAUQHTON.W F
NAVARRQ. C C
NEIGHBORS, D
NEILL, R H
NerLSON.fi H
8007200670
00071BQ169"
B007310517
0007030043
B007230633"
30-434 8
COMMISSION
50-8*1 P
PR
FOIA
NEILSQN, L E
NEISLER, J H
NELSON, P R
NELSON. P R
NELSON. P R
0004010434
0007230/00"
B007 170322"
0007170326*
8007170266a
MIEC
90-373 Q
70-1869
FOIA
30-219 Q
NELSON. P R
NELSON, J
NELSON, J D
NELGON. J D
NELBQN. J D
8007170276*
8007020176
800 72101 S3
8007210177
H007230135
30-217 Q
MISC
40-8452
40-8432
10-8492
MEL-BOM, 0
NELSON, C C
NELSON- R R
NELSON, R L
NELSON, J D
B0070BOOB2
0007110535
8007090393
0007230328"
0007830725"
COMMISSION
30-307 P
RECOD
30-303 Q
40-8432
NELSON, C C
NELSON, C C
NEUMAN. R F
NEUMANN, 11 R
NEUMANN. M R
8007100161
0007290007
3004300335
Q007020702
6007030002
30-335 P
30-70 P
30-133 H
40-03SO
40-03BO
NEUMANN, M R
NEUMANN. M R
NFUMANN, M R
NEUMANN, M R
NEUMANN. M R
Q007210166
8007380033
8007240100
8007220032
S007 160390
40-0300
40-0300
40-8380
40-83BQ
40-93SO
NEUHANN, H H
NEHBERRY. B
NEWMAN. H K
NEWMAN. J R
NEUMAN, J R
0007210224
8007110489*
0007010091"
0007020471
8007020471
40-8300
30-320 P
40-2674
BO-466 0
30-466 0
NEWMAN, J R
NEWMAN, J R
NEWMAN. J R
NEWMAN. J R
NEWMAN, J R
S0070B0017*
8007000017*
8007090189
8007090169
8007160370
90-466 0
50-466 0
30-466 0
50-466 0
50-466 0
NEWMAN, J R
NEWMAN, J R
NEWMAN. J R
NEWMAN, J R
NEWMAN, J R
80071*0570
800716064S
8007160645
B007 160639
B007160639
50-466 0
30-466 0
50-466 0
30-466 fl
90-466 0
NEWMAN, J R
NEUMAN, J R
NEWMAN, J R
NEWMAN. J R
NEWMAN- J R
0007180432
S007 100432
8007230424
8007250424
0007270082
90-466 0
50-466 0
SO-466 0
90-466 0
30-466 0
NEWMAN, J R
NEWMAN, J R
NEWMAN, J R
NEWMAN, J R
NEWMAN, J R
0007270002
8007300413
8007300449
8007300413
8007300449
30-466 0
SO-466 9
30-466 •&
90-466 9
30-466 0
NEWMAN, J R
NEWMAN, J R
NEWMAN, J R
NEWMAN, J R
NEKON, H H
8007310094
8007310308
8007310094
8007310308
BOO? 100 130
SO-466 0
30-466 0
90-466 0
30-466 0
PflM
NEY, M R
NICHOLSON,? J
NICHOLS, T, C
NIELSEN, A D
NIELSEN. 0 A
0007070121
8007170179
8007310428
8007140016
8007100337
PR
PR
70-2860
30-273 H
30-409 D
PERSONAL AUTHOR INDEX
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
NIJHAWAN, 8
NIJHAWAN, B
NILSQN.R
NILSON, R
NIMITZ.R
8007I7046O
B00714064B
7909210176
B007070402
S0071500S1
RES
RE0
RECOD
PR
50-2S6 S
NIX. R T
NIK, R T
NIX. R T
NIX, R T
NIX, R T
B007O 10303*
0007O30274*
QOD7O302S2*
8007030279»
80071 10436*
30-366 S
50-366 8
50-366 S
50-366 S
50-321 B
N1X.R T
NIX.R T
NIX.R T
NIX.R T
NIX.R T
0007130344*
800715Q6B5"
B0071S030B*
9007130674"
B0071703B7*
30-321 B
50-366 S
90-321 8
50-321 B
30-321 B
NIX.fi T
NIX.R T
NIX.R T
NIX.R T
N1X.H T
B007 170409"
00071 704 1O»
8007 170463"
9007170497"
B00717046S"
90-321 B
30-366 S
30-321 8
30-321 8
50-366 8
NIX.R T
NIX.R.T
NIX.R T
NIX.R. T,
MIX,R T
B0072B0312*
8007240128*
8007240167*
00072:30412"
80072B0449"
50-366 8
50-366 S
50-366 S
50-366 S
SO-321 B
NIX.R T
NIX, R T
NIX,R T
NIX, R T
NIX.R T
B0072B0526*
B007200446*
8007BB03SS*
80072 B0640*
8O072 80690"
50-366 B
90-381 S
50-321 B
50-3S1 8
50-321 S
NIXON, M A
NIXON, M A
NIXON. M A.
NIXON, U A
NOCELLA, 8, J,
B0072 20220*
Q007S104BO
80073 10271
00073 1032O
8007140248
70-139
40-2061
40-2061
40-9027
FOIA
NOONAN, V,
NORDEfiHAUO, L R
NORDEflHAUO. L. R
NORDGRHAUO, L R
NORDERHAUO, L F1
8004240210
B007 140696
8007010177
8007240032
8007210474.
tt,E
XPOftTUlC
50-344 0
70-1297
50-27 Q
NOFlDEfiHAUQ, L R
NORDERHAUO, L R
NQRDEfiHAUQ, L R
NORDERHAUQ-L R
NORELIUB.C E
B00724049S
0007230194
B007240361
8007310523
B00721012S*
70-23
30-312 8
30-106 Q
50-139 0
30-40J Q
NORELIUB.C E
NORfiHOLH, L J
NORTH, H 8
MOUTH. H
NORTON, B
8007280435*
80073 1009S"
00071 10IB4*
B007230297"
BO07070123
30-346 0
50-278 Q
90-206 Q
90-206 Q
90-279 0
NORTON, B
NOSENZO. L V
NQ9ENZO.L V
NOSENZO. L V
NOSENZO, L V
8007180405
8007210076*
80-0701 00 18
B007 140960*
SO 072 10073
90-H7S 0
BECY
XPORTLIC
BECY
XPORTUIC
NQSENZO.L V
NOSENZO, L V
NOSENZO, L V
NOaENZD.L V
NOSENZO, L V
GO 07 170204
8007170223
8007170235
9007170251 *
8007210096
XPORTLIC
XPORTLIC
XPORTLIC
BECY
XPORTLIC
NOSENZO, L, V
NOSENZO.L V
NOSENZO, L V
NOSENZO, L V
N09ENZD.L V
SO 070 10009
80070 100 19
S007020260
S0071O0146
800717007H
XPORTLIC
XPORTLIC
XPORTLIC
XPDRTL1C
XPORTLIC
N09ENZO.L V
NOSENZO, L, V
NOSENZO, L V
NOSENZO, L V,
NOTLEY, D P
8007170003
8007240440
0007280347
000728053?
B007 140302"
XPORTLIC
XPOHTLIC
XPOHTLK:
XPORTLIC
FOIA
NOVAK, T, M
NDVAK, T
NOVAK, T M
NDVAK, T
NOVAK,! M
8007250702
BQ07Q20314
0007020451
80071 001 S3-
8007100453
30-344 P
90-249 P
50-271 H
30-277 P
50-309 F
NDVAK, T. M,
NOVAK, T M
NDVAK, T M
NOVAK, T. M
NDVAK, T M
8007030371
8007020467
00071O0006
8007110512
00071 10341
90-313 P
80-302 F
30-346 P
mac
90-336 P
NOVAK, T M,
NOVAK, T. M
NOVAK, T. M
NOVAK, T M
NOVAK, T M
'8007020711
80071700*0
8007170444
8007180341
B0072 100SB
90-259 P
90-309 P
90-309 F
30-331 P
90-319 F
AUTHOR
ACCESSION!
NUMBER
SUBJECT
CrtTEOQRY
NOVAK, T H
NOVAK, T H
NOVAK. T H
NOVAK, T H
NOVAK. T M
S00717065L
8007170667
8007180119
8007210004
3007210035
50-289
50-312
50-E77
30-269
50-346
P
P
P
P
P
NOVAK, T H
NOVAK, T H
NDVAK, T 11
NDVAK. T H
NOVAK, T H
60073101 1O
BOO 72101 15
6007310573
8007210591
000721 05B9
30-302
50-346
50-3 4 A
50-303
50-313
P
P
S
P
P
NOVAK, T H
NDVAK, T H
NOVAK, T M
NDVAK, T M
NOVAK, T H
000724024-!
B007 170241
0007180506
B007I70SS0
0007210023
50-312
30-2:47
50-321
50-331
50-313
P
P
P
P
P
NOVAK, T M
NDVAK, T H
NOVAK, T H
NOVAK. T M
NOVAK, T H
0007210026
00072400B5
0007540288
000724030(1
0007240311
50-299
50-266
50-339
50-344
50-360
P
V
p
p
p
NOVAK, T M
NDVAK, T H
NOVAK, T H
NOVAK, T M
NDVAK, T 11
8007240330
0007240333
0007240339
9007240346
B007H403SO
50-26A
90-299
50-335
90-309
50-336
p
p
p
p
p
NOVAK, T M
NOVAK, T M
NDVAK, T M
NOVAK, T M
NOVAKOVICH, D
9007240390
0007H403B0
B007240399
0007HBOI69
B0072B0303
90-317
so-ass
90-70
50-338
XPORTLIC
p
p
p
p
NOVAK, T H
NOVAK, T H
NOVAKiT H
NOVAK, T M
NOVAK, T H
0007210020
H0072B0343
0007280343
80072B0350
0007200353
50-309
50-277
30-289
30-313
50-346
p
p
p
p
p
NOVAK, T H
NOVAK, T M
NDVAK. T H
NOVAK, T M
NDVAK, T H
8007230651
9007230696
0007230708
0007250393
00072B0119
30-313
30-331
50-269
30-302
30-270
p
p
p
p
p
NOVAK, T M
NOVAK, T M
NDVAK. T M
NOVARRD.J P
NDVARRO. J P
8007300553
8007310336
8007310590
0007210010*
8007090243
50-270
30-321
30-346
30-322
30-322
p
p
p
Q
K
NDVARRQ.J P
NDVARRD. J P
NDVARRO. J P
NOW1CKI.S J
HOHICKliS J
9007140390
8007150655
8007230438
8007110129
O00711011D
50-332
30-322
50-322
50-244
30-219
B
A
A
F
F
NOHJCK1.B J
NOUJCKI.S J
MUOENT, E L
NUNN.D E
MURNBEROER. C E
8007100214
8007100217
8007O10443
8007310493
8007140991
30-244
50-206
40-2299
50-361
PR
F
Q
B
NYOAAHD, 0
NYQAARD, 0 R
NYOF10N, J
0 'CONNOR, L A
0 'CONNOR, L A
8007280699*
8007310101
8007140606
8007140333
8007150632
50-409
50-409
40-B902
50-213
50-24S
Q
0
I
I
O'DONNELL, A J
O'HANLON.J P
0 -HEAR, J W
O'NEILL. T V
O'NEILL, J
8007140045
8007380546
0007220973"
B0072900S6*
0007310400
PR
50-313
50-4 16
M1SC
50-193
8
A
0
O'REILLY.J P
O'REILLY.J P
0'REILLY,L A
O'REIULY.J P
O'REILLY.J P
9007 130039"
8007310339"
8007240004
8007340089
90-293
70-1113
30-29B
90-437
50-259
P
Q
Q
Q
O'REILLY.J P
O'REILLY.J P
D'REILLY.J P
O'REILLY, J P
O'REILLY! J P
8007240108
8O07240113
Q007240122
8007240139
8007240202
50-349
90-261
50-269
50-4BB
90-302
Q
0
0
a
Q
O'REILLY.J P
O'REILLY.J P
D'REILLY.J P,
O'REILLY.J P
O'REILLY.J P
9007240206
0007240313
0007240219
8007340220
0007240232
50-250
50-321
30-416
30-393
50-395
ooooo
Q'REILLY.J P
O'REILLY, J P
D'REILLY.J P
O'REILLY.J P
O'REILLY, J P,
8007840230
0007140476
9007140479
8007140404
8007140489
30-280
50-259
30-31B
50-414
30-324
Q
Q
0
Q
Q
AUTHOR
ACCESSION
NUMBER
SUOJEC
CATEQQI
O'REILLY, J P
O'REILLY. J P
O'REILLY, J P
O'REILLY, J P
O'REILLY, J P
30071 ^0470
8007020170
90Q70PO171
0007020173
8007030178
50-321
30-393
90-395
50-416
50-321
O'REILLY, J P
O'REILLY, J P
0'HEILLY, J P
O'REILLY, J P
O'REILLY, J P
B00702O179
9007020130
B007O2O1B7
BOQ702O192
8007020200
50-3O2
50-343
SO- 241
50-259
50-280
O'REILLY, J P
O'REILLY, J P
O'REILLY. J P
O'REILLY, J P
O'REILLY. J P
GOO 7020 Z 04
S00702O231
8007 ISO 4 69*
B007210414
9007210419
90-249
50-250
50-230
50-437
50-343
O'REILLY. J P
O'REILLY, J P
O'REILLY, J P
O'REILLY, J P
O'flEILLV, J P
3007210422
8007210439
0007210449
90072104 SS
8007210463
50-241
90—190
50-249
50-230
9 0-3O a
O'REILLVr J P
0'REILLV,J P
Q'REILLV.J P
O'RElLLVrJ P
O'RElLLVrJ P
B00721O468
B00721047t
Q007210472
B00721O477
BQ0721049B
30-4B4 ,
90-393
50-393
90-2BO
50-327
Q'REILLYrJ P
O'REILLY,J P
0'REILLYrJ P
O'REILLVrJ P
O'REILLY, J P
9007010173
8007010179
S00701019B
E007Q10206
8007010213
50-437
90-S61
50-4BB
30-250
50-269
O'REILLY, J P
Q'REILLY.J P
Q'RCILLY, J P
O'RCILLY, J P
O'REILLY. J P
8007010220
0007010333
B007010239
B0070 10242
600701 024S
50-321
50-259
50-2 BO
50-395
30-393
•O'REILLY, J P
O'REILLY.J P
O'REILLY, J P
O'REILLY. J P
O'REILLV.J P
B0070 10250
B007OI0251
BOO 70 10253
8007310233*
B007220O17
50-416
50-302
30-340
50-3 B9
30-395
Q'REILLY.d P
O'REILLV.J1 P
O'REILLV.J P
O'REILLY, J P
O'fielLLY.J P
8007220020
a 007220 026
800722-0029
0-007220010
B 00722 0043
90-332
50-437
90-S59
30-349
5Q-B61
O'REILLY, J P
O'REILLY.J1 P
O'REILLY.J1 P
Q'REILLY.J' P
O'REILLY, J P
8007220049
B 007320051
S 00722 0062
0007220066
B 00723 0072
30-269
90-4 3B
30-230
90-230
50-321
O'REILLY. J P
O'REILLY, J P
O'REILLY. J P
O'REILLY.J P
O'flEILLV. J P
6007920076
600722007B
6007320033
6007160310
6007160223
50-302
30-416
30-393
50-3 4B
5Q-H61
O'REILLY.J P
O'REILLY, J P
O'REILLY, J P
O'REILLY.J P
O'REILLY. J P
S0071AQ230
3007160255
8007160262
•9007160265
B007 140274
9Q-4B8
50-269
50-302
50-290
50-424
0JRE1LLY, J P
O'REILLY, J P
D'REILLY.J P
O'REILLY.J P
O'REILLY, J P
8007140278
90O7 140281
8007140287
3007140307
0007160313
50-416
90-395
50-327
so-aao
30-437
O'REILLY.J P
O'REILLY.J P
O'REILLY.J P
Q'R£ILLV, J P
O'REILLY. J P
B007 1 4,0289
9007140294
B007 1 4O299
8007 1 4O30 1
aoO? 140306
30-324
50-331
30-416
5Q-31B
30-2S9
O'REILLYrJ P
O'REILLY.J P
O'REILLY.J P
O'REILLY, J P
O'REILLY.J P
80072 5033B
8007SB0339
B007 £30344
9007290368
8007250372
50-364
SO-400
50-361?
SO-4B'
30-"
O'KEILLY.J P
Q'KEILLY.J P
O'REILLY, J P.
O'REILLY.J P
O'REILLY.J P
9007250375
8007250377
BOO 7 35037 Q
BOO 7 350380
9007280361
S'
O'REILLY.J P
O'REILLY, J P
Q'REILLY.J P
0'R.EILLY, J P
O'ftEILLY.J P
B007 23036 4
9007250389
8007310537
SQ07 020721
80070B0723
51
&l
Si
71
71
448
PERSONAL AUTHOR INDEX
AUTHOR
AC C ESS E (IN
NUMBER
SUBJECT
CATEOQFIV
Q'tteiLLY, J P
9007020725
70-1301
O'REILLV, J P
O'REILLY, J P
O'REILLY, J P
O'REILLY, J P
Q00702O729
BQ070 30232
SQ07020733
8007020731
70-143
70-1113
7O-1319
70-1131
O'REILLY. J P
BOO/0^0736
50-321 0
O'REILLY, J P
O'REILLY, J P
O'REILLY, J P
O'REILLY, J P
8007020737
Q007020741
BOO 702074 3
(3007020743
50-395 Q
50-302 0
50-261 0
O'RCILLY-J P
O'REILLY, J P
O'REIU-Vi J P
B0070307+B
S007020751
8007020/33
50-395 0
50-34B 0
50-250 Q
a-REILLYi J P
O'REILLV, J P
0007020737
B007020761
90-290 Q
30-299 ft
O'liEILLV, J P
O'RCtLLY, d P
O'REILLV, J P
O'REILLV, J P
BO 07020 763
600/070010
B007020-374
8Q07OS03EJO
50-269 d
70-143
50-416 0
30-437 a
O'REILLY, J P
SOQ7020381
50 393 a
O'REILLY, J P
O'JIEILLY, J P
O'REILLY, J P
O'REILLY, J P
O'REILLY, J P
0007030384
9007020335
8007020391
B0070 20409
0007030034
90-395 a
50-34B a
50-359 Q
50-303 Q
90-aao Q
D'REILLY.J P
O'REILLY, J P
a'REILLV, J P
O'REILLY.J P
O'REILLY, J P
B00702Q4'IO
B007020445
B007O20'150
0007020457-
50-261 Q
50-400 0
50-321 0
30-230 0
50-269 Q
O'REILtY. J P
O'REILLY, J P
O'REILLY, J P
a-REILLY-J P
O'REILLY.J P
8007290395
B00730097i.
B007310344
B0071607B1
30Q71607R"*
30-239 Q
50-321 Q
30-239 Q
90-399 0
50-393 Q
O'REILLYi J P
6007 160797
90-416 0
Q'flEILLY.J P
O'nCILLY.O P
O'REILLY.J P
O'REILLV, J P
0007 1 607 7 1
8007160794
800/160800
D007 170070
90-302 0
90-261 0
30-257 Q
O'REILLY.J P
O'REILLY, J P
O'REILLY, J P
O'BEILLY, J P
D0071 70076
0007170104
6007170109
60071701 19
90-400 0
50-269 0
50-250 Q
30-321 a
O'REILLY, J P
0007170119
90-300 d
O'REILLY, J P
D'HeiLLY,J P
O'REILLY, J P
O'REILLY, J P
O'REILLY, J P
G0071701H6
BOO? 1701 31
9007170134
8007170137
B007 170141
50-332 Q
70-1319
90-437 a
90-13 Q
70-1 OJ
O'REILLY, J P
3007170144
70-1201
O'HEIt-LY, J P
O'REJLLY, J P
B007170HB
8007170141?
70-B3rt
70-37
O'REILLY, J P
80071 701 52
70-1113
d'HEILLV, J P
Q0071701D4
70-143
0'RtILLY, J J1
Q'REILLV, J P
60071 70 ISfl
B007170U4
30-160 Q
50-111 Q
O'REILLY, J P
0 'FIE ILLY, J P
O'REILLY- J P
8007170U6
8007170173
0007170177
SO-83 Q
30-62 0
30-338 0
O'REILLY. 0 P
Q'REILLY.J P
O'REILLV. J P
0JREILLV, J P
0'HE1LLY. J P
800/1701B1
BOQ71701B3
B00717019Q
0007230199
DO 07830 2 06
50-124 0
30-139 0
90-406 Q
50-437 0
30-348 0
O'REILLY, J P
O'REILLY, J P
0007230210
0007330213
90-302 0
30-416 0
O'R-EILLY, J P
(1007230215
50-379 Q
O'REILLY, J P
BQ0723&217
30-395 0
'W
90-261 a
1
50-480 0
,
90-369 Q
1
30-230 a
I
30-321 0
a
a
1
AUTHOR
ACCESSION
HUMOEFI
SUBJECT
CATEOBHV
tlLAacOAOA.n T
HLDHEIIQi T
C1LIU, IJ E
OLIU.U
OL1UAOOTI.O R
B0073 10341
BOO7O10233'
8O073 10004
8007iA0773
0007280155
NUREO
FOIA
NUREO
MIBC
71-192
OUUEfi.lt E
OLLER, R E
OLLEH, R E
CILLER. R E
tlLKSTEAD' U J
B007IA0157*
80072S0109*
6007210539*
6007290362*
SOQ72 30536
QA999
OA999
OA999
QA999
5O-278 G
OLMSTEAn.W J
OLfeEN, A F
QLEEN. A F
CJL6HAN, L II
DLSHAM, L H
S0073 10461
flOOTOlOOOi
Boovoioa^s
P007110557
800717031"?
3O-27S Q
7O-824
70-B24
50-247 P
SO-249 P
OLSHAN, L 11
OL3HAMIH. L N
OLSON. J r
aL30(J, R C
OLSON, A IJ
B0073 00092
9007310514
9007100203
8007020349
B007110617
30-2BA P
50-atlb P
50-282 0
90-317 P
I1UI4EO
OLBON. J F
OLSON, J F
OLSON, J r
OPLIN8EI1.0 O
apnEft, o H
30071-10011
8007H309fl3
0007250432
770A 200223
B007a3071B
PR
PR
SO-SB2 O
JCPOF1TLIC
30-493 a
DPREA, 0 W
orrtEA, o w
OPREA, 0 H
OPflEA, 0 M
OPRCA, 0 W
B007 1 70203
60O702O6 1 8
6007O9O246
Q007O903(.S
8007110337
50-49B a
50-490 3
50-49B O
30-493 B
30-493 3
OPJiCrt, 0 W
Qpncfi. o w
OPHCA. 0 H
DPREA, 0 IJ
DPF1EA,0 W
8007190445
Q0071&0604
0007310&11
600 7220 57B
8007S305t2
50-498 S
50-49B B
30-49B S
50-470 Q
50-498 B
OPREA, 0 W
OPnCrt.O H
OPIIEfl.O M
tll'REA. 0 11
CPREA.O W
000723052S
000/230476
0007330510
80&73Q0310
BO 07300302
30-49S B
90-498 S
5O-4-9B S
90-466 H
90-198 B
OHUOBKY, P M
flFiLOSKY, P ft
(IHTf-OFr, 0 D
nnviB. u J
CBANN.E W
BOO/PaO&54
0007290694
BOO?aBOOfl7
B0071B0072
B0070BOODS
50-37 R
30-37 R
10-B1O2
NUREO
50-367 0
OSAHN-E W
osr, F
OBTCNDaRF, D I.
agiEn, J
tiaiFR. J
B0070H0055
8007160662*
8007200677*
0007150616
S007290701?
50-367 0
SO-299 8
00-409 0
50-254 J
50-284 J
DBTON, B 0
OBTnANDEfl.r W
OBTnANDEn.F W
aarnANOER.F u
tiarnftMDEn.r u
B007100iaD»
6007300357
GQOV300377*
00073-00'101
fl0073004(70»
PR
S 0-3-1 4 0
50-522 0
30-344 0
50-344 0
OQTRANREn. F II
ClBTRANDEIl, F U
OBTRANDEn. F U
OTT.H, R
DTT€I30N,H U
B007300194*
6007300900*
3007300506*
•3007090017*
0007190003
50-344 0
50-344 0
&0-344 0
SECY
90-306 Q
OTTOSON-H L
CITT03(INiH L
OTTUBUHiH I.
DTT030N. H L
OTTGSON, M L
0007290636
9Q072B0072
00070 10833
B0071002A2
Q0072S039B
30-206 Q
30-H06 Q
30-206 S
30-206 R
50-S06 0
OTT(iaON,ll L
OTT030M.H L
OTTOOQNtH L
OWEN, W H
CHBLGV. 0 F
0007000403
£3007280391
000/200376
000702066H
00071 103fll
50-206 S
30-206 9
50-206 S
PR
VOPflEP
OUG1-EV. 0 F
OUELEY.O.F
OUZAHSKI P C
PACE, P U
PMHAL.H, F
8007110213
0007290733
BOO/2B0002
BOO 7230 -1 21"
000 7290372
TOPREP
TOPRGP
RC8
50-250 8
XPORTLIC
PrtOrtNDiF 0
PACE, 11 0
80O7310193
0007010096
E0070lOa01*
B0070 10094
000701O189
30-330 F
7O- 1063
70-1062
70-2BS5
70-2838
30O7010195*
80O70B04S9
B0070B0330
9007100117
B007O2O34 1
70-2B3B
70-2609
70-E9IO
40-B027
70-6B7
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
PACE, R 0
B007030022
70-1151
PAGE. R 0
90072B0320
70-1319
PA8E.R n
B007220211
70-135
PAOE.fi ffl
B00722O242*
70-133
PAGE, R O
0007070187
70-1113
PAGE.R 0
8007240099
70-1359
PAGE.R 0
Q007230056
70-2375
PAQE.R O
8007240282
70-173B
PAOE.R O
0007240106
70-1201
PAOE,R 0
B0072401 19
70-27
PAOE.R <S
B007290072
70-143
PALCHESKO, C M
8007250343
40-2561
PALUSAMY, S S
B007020644*
TOPREP
PANX.ABK1E, P J
B007O100B2*
FOIA
PANK.A8KIE.P J
S0070101S7*
FOIA
PANKASKIE.P J
B007010191*
FOIA
PANKASKIE.P J
00070 1023B*
FOIA
PAPAY, L T
0007020149"
50-361
Q
PAPAY, L T
80072400B3
50-361
Q
PAPAY, L T
S007 170563*
30-206
Q
PAPAY, L T
B007090330
90-361
6
PAPAY, L T
8007230287*
50-206
Q
PAPAY, L T
8007230579
90-361
B
PAPERIELLO, C J
8004240258
IfcE
PAPERIELLO, C
8004240278
IfeE
PAPPAS, H
B0071 40597
ORO
PAPPAB, H
8007010150
50-10
Q
PAPPAS, H
B007010157
DRC
PAPPAS, H
800702027B
30-10
Q
PAPPAS, H
B0072 10336
ORO
PAPPA8, H
B007I50770
ORO
PAPPAB, H
6007220261
ORO
PAPPAS, H
B0071404H1
ORO
PAPPAS, H
B007H90104
ORO
PAPPAB, H
0007030032
50-10
Q
PAPPAS. H
8007030054
ORO
PAPPAS, H
8007H40065
ORO
PAPPAS, H
B007 170343
ORO
PAPPAS, H
B007I40366
30-10
Q
BOO 7220234*
50-305
P
PARI8,Q H
8007220006
50-320
0
PARKER. W D
B0060S0319
30-369
B
PARKER. H 0
B007100419*
50-413
Q
PAHKER.W 0
8007090402
PR
PARKER, H 0
8007140397
50-269
P
PARKER. M 0
B007010063
50-269
Q
PARKER, U 0
8007140083
NUREO
PARKER, U 0
90070301 B6
PRM
PARKER, H 0
8007020537
50-413
S
PARKER.W 0
BOO? 100036
30-369
a
PARKER.W 0
8007100139
30-270
a
PARKER, H 0
B0071B0349
80-270
Q
PARKER. H 0
B0071300I3
30-269
a
PARKER, M 0
B00701O209
30-269
F
PARKER, W 0
B0070 10309
30-369
F
PARKER, 14 D
8007010360
50-269
P
PARKER, M O
8007180333
30-269
a
PARKER, M 0
8007020873
30-269
F
PARKER, H Q
B007220192
30-269
0
PARKER, U 0)
B007O70319
30-269
9
PARKEfi.W 0
S007230598
30-369
a
PARKER, M 0
B0072B0068
90-269
a
PAHKER.H 0
BOQ70B0223
30-269
p
PARKER, U d
B007090271
50-269
p
PARKER, M 0
8007220249
30-269
a
PARKER, W 0
8007080201
30-270
B
PARKER, U O
8007080343
50-369
A
FAHKEH, W 0
8007 1 1 0360
50-269
s
PARKER, W O
B007240357
50-369
0
PARKEFt.H 0
8007110294
30-269
p
PARKER, H D
B007 160657
30-369
3
P-ARKER. W 0
0007210114
30-369
a
PARKER, U 0
B007B 10261
30-413
a
PARKER, W O
8007240469
90-369
a
PARKER, H 0
8007250166
50-269
a
PARKER, U D
8007110309
30-369
A
PARKER, W 0
8007280416
30-270
a
PARKER ,W 0.
8007180321
5O-270
B
PASKEfi.U Q
PARKER, H 0
B0071B0417
B007290267
90-207
50-270
B
Q
PARKER, U 0
8007150573
50-269
P
PARKER, M 0
PARKER, U D
8007160514
B007210417
30-413
90-269
B
B
PARKER, W 0
PARKER, H. 0
8007210459
8007210609
50-269
50-387
B
9
PERSONAL AUTHOR INDEX
449
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
PARKER, H C
PARKER, W 0
PARKER, H 0
PARKER, W 0
PARKER, W 0
B007220477
B0072103B3
BG072B0437
B0072 10425
8007220563
50-269
50-369
50-269
50-270
50-269
P
A
P
P
S
PARKER, H a
PARKER. H 0
PAflKER.W 0
PARKER. W 0
PARKER, H 0
B0073I0491
B00722Q424
8007220336
8007220561
B007280901
50-270
50-269
50-369
50-259
50-413
Q
S
A
P
S
PARKER, H 0
PARKER, W 0
PARKER, W 0
PARKER, H a
PARKER, W O
6007220363
8007300459
8007280427
80072B0544
BQ07290635
50-369
90-369
30-270
50-269
50-2B7
A
A
P
P
S
PARKER, W 0
PAflKER.W 0
PARKER, W 0
PAfiMENTER, F
PARR 1 8. H 0
8007390824
9007300333
8007310379
8007160547
8007240453
50-270
50-369
50-269
50-449
50-259
S
S
p
M
B
PARR I S. H 0
PARROTT, M W
PARROTT, M W
PARRY. S J S
PARSONS, R
8007290651
B0072B0170*
800730001S
S007 100334*
B007110506
50-327 P
COMMISSION
PR
FOIA
30-320 P
PARTLOW, J 0
PARTLOW, J 0
PARTLQH, J 0,
PARTLOW, J 0,
PARTLOW, J 8
8007 1 00081*
BOO 701 0221
80071 7063B
B007210109
8007290673
70-143
70-143
70-139
70-364
70-1113
PARTLOU. J 0
PARTLOW, J Q
PASSMAN, N A
PASTERNAK. R J,
PASTERNAK, R J
8007250053
B00723071H
8007310430*
S007010164
8007 ISO 128
70-27
70-364
50-286
50-333
50-333
S
0
0
PASTERNAK, R J
PASTERNAK, R J
PASTERNAK, R J
PASTERNAK, R J
PASTERNAK, R J
BOQ70 10486
8007010511
SCO 70 10481
8007290*69
8007090192
90-333
30-333
90-333
90-333
30-333
S
S
S
Q
R
PASTERNAK, R J
PASTERNAK, R J
PA8TERNAK.fi J
PASTERNAK, R J
PABTERNAK, R J
8007210586
BQ0714036B
B007 140383
8007250290
B0071 50707
50-333
50-333
30-333
30-333
50-333
Q
B
B
Q
S
PASTERNAK, R J
PASTERNAK, R J
PASTERNAK, R, J
PASTERNAK, R J
PATE. R J
BQ0731Q474
B0072B0315
8007880610
S007280662
aoo702om*
50-333
50-333
90-333
90-333
30-361
0
S
8
S
Q
PATE, R J
PATEL, B R
PA TON, W D
PATON, W D,
PATON, W D.
800 73003 IB*
0007220334*
8007010333
8007090095
B007 190697
50-361
TQPREP
50-329
50-329
50-329
Q
0
0
H
PATDN,U, D
PATON, U D
PATON, H, D
PATON, W D
PATON, H D
8007170226
8007 170233
S007 170369
8007170383
B0071S0242
90-329
90-329
90-956
90-329
90-329
0
0
0
0
0
PATTERSON, J D
PATTERSON, J D
PATTERSON, J D
PATTERSON, J P
PATTERSON, J P
8007020406
8007020413*
8007100355
S007110B18*
8007140682)1
PR
PR
PRH
70-925
70-1193
PATTERSON, J P
PATTON.fi M
PATTON.R.H,
PATTON, R M
PATTDN.R M
B00729QS73*
80071 80099
8007220102*
8007130103
8007230093
50-25*
PR
PR
Pfi
PR
Q
PAULSON, U A
PAULBON, M A
PAXTON.H C
PECK, C, C
PECK, H,
8007140524
8007310519
80072907B9
8007100003*
B007020457
50-219
30-219
30-344
60-320
PR
P
P
0
Q
PEDERSEN, K
PEDERSEN, K
PEERY, W W,
PEERY, H W
PEERY, W M
8007310247*
B007310S50*
8007010306*
9007010291*
BOO 7290401*
FOIA
FOIA
50-219
50-334
50-239
Q
Q
Q
PELTIER, I A,
PENDERORAFT, R
PENDERORAFT, R
PENDERORAFT, R
PENDERORAFT, R
B0072B0123
B0070 10339*
S0070 10441*
8007010440*
8007080166*
30-358
90-368
50-368
90-368
30-36B
A
S
9
B
S
AU 1 HQR
ACCESSION
NUMBER
SUBJECT
CATEGORY
PENDERGRAFT, R
PENDERQHAFT. R
PENDERQHAFT. R
PENDERGRAFT, R
PENDERGRAFT, R
80070B017S*
8007280655*
8007090336*
8007150660*
9007150693"
SO-36S S
50-369 S
50-368 S
50-368 S
50-360 S
PENDERORAFT, R
PENTZ.D L
PEOPLES, D L
PEOPLES, D L
PEOPLES, D L
8007210382*
80072B0717*
8007020050
8007210292*
8007230231*
50-368 R
CONTRACT
50-295 Q
50-373 G
50-373 a
PEOPLES, D L
PEOPLES, D I.
PEOPLES. D L
PEOPLES, D L
PEOPLES, D L
BOQ70E03S8
8007110206*
8007020074
8007240298*
B007 100004
PR
50-10 G
50-249 Q
50-249 Q
50-10 0
PEOPLES, D L
PEOPLES. D L
PEOPLES, D L
PEOPLES. D L
PEOPLES, D L
8007100343
8007140235
B0072B06B8*
8007010347
S007230187
PHM
PRM
30-373 0
50-10 F
PR
PEOPLES, D L
PEOPLES, D L
PEOPLES, D L
PEOPLES, D L
PEOPLES, D L
S007250641
80072 B0650
S007300469
8007310533*
B007 150529
50-10 0
50-10 0
PR
50-373 0
50-373 A
PEOPLES, D L
PEOPLES, D L
PEOPLES, D L
PEOPLES, D L
PEOPLES, D L
8007240351*
80072S063B
8007280074
8007310357
8007250467
50-456 Q
50-10 G
50-254 0
50-254 Q
90-373 0
PEOPLES, D L
PERANICH. M H
PERLMAN, J
PERLHAN, J
PERLMAN, J
800722051 B
B007290030
80070704 IB*
8007100112*
8007300587*
90-373 A
QA999
CONTRACT
CONTRACT
90-390 A
PERLMAN, J
PERLMAN, J
PERNY. C D
PERRIGO.L D
PERROTTI.D J
8007280236*
8007300590*
BQ07010135*
8007290246
B007I 10276*
CONTRACT
CONTRACT
70-143
RES
50-321 Q
PERROTTI.D J
PERRY. J C
PERRY, J C
PERRY, J C
PERSON, L
B007H10093*
80070B0420*
8007150826*
80072B0553*
8007230576
70-1191
50-344 S
50-344 8
90-344 3
40-6622
PETERSON. R
PETERSON, M R
PETERSON, M R
PETERSON, M R
PETERSON, M R
8007070099
S007010170
8007020020
8007020057
B00702023S
40-1162
XPDRTLIC
XPORTLIC
XPORTLIC
XPORTLIC
PETERSON, M R
PETERSON, M R
PETERSON. M R
PETERBON,M R
PETERSON, H R
8007020344
800702034B
8007020351
8007030236
B007010014
XPDRTLIC
XPORTLIC
XPORTLIC
XPORTLIC
XPORTLIC
PETERSON, M R
PETERSON, M R,
PETERSON, M R
PETERSON, M R
PETERSON, M R
6007020274
80070202B3
8007020.123
S0070202B9
8007020277
XPORTLIC
XPORTLIC
XPORTUC
XPORTLIC
XPORTLEC
PETERSON, K R
PETERSON, A F
PETERSON, D 8
PETERSON, M R,
PETERSON, M R
8007070038
8007070279
8007130159
8007020373
8007030360
XPORTLIC
50-250 0
REOOD
XPOftTLIC
XPORTUC
PETERSON, M Ft
PETERSON, H R,
PETERflOM.M R,
PETERSOM, M R
PETERSON, M R
8007070007
8007070035
8007070047
8007070111
8007070425
XPQflTLIC
XPORTLIC
XPORTLIC
XPORTLIC
XPORTLIC
PETERSON, H R
PETERSON, M R
PETERSON, M R
PETERSON, M R
PETERSON, M R
8007090109
80071000B7
8007110252
6007100341
80071 10029
XPORTLIC
XPORTLIC
XPOHTLIC
XPORTLIC
XPORTLIC
PETERSON, M R
PETERSON. M R
PETERSON, M R
PETERSON. M R
PETERSON. M R
60071 10213
80071 10491
8007140283
8007140288*
8007140567
XPOHTLIC
XPQKTLIC
XPORTLIC
XPORTLIC
XPORTLIC
PETERSON, M R
PETERSON, M R,
PETERSON, M R
PETERSON, M R
PETERSON, M R
8007210124
8007 140353
8007140266
8007140274*
B007140S93
XPORTLIC
XPORTLIC
XPORTLIC
XPORTLIC
XPOHTLIC
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
PETERSON, M R
PETERSON, tl R
PETERSON. M R
PETERSON, H R
PETERSON, M fi
BOC-7140588
SO 0-7 140 596
8007140603
8007150073
8007150078
XPORTLIC
XPOHTLIC
XPOflTLIC
XPDRTLIC
XPQRTLIC
PETERSON, M R
PETERSON, 11 R
PETERSON, M R
PETERSON, M R
PETERSON, M R
8007170534*
BOOTH 021 a
80071102S6
8007110271
8007210083"
SECY
XPDRTLIC
XPDRTLIC
XPORTLIC
SECY
PETERSOM, M R
PETERSON. 11 R
PETERSON, N R
PETERSON, M R
PETERSON, M R
6007110241
B007140711
8007 1 5000 1
8007190003
80O7 190008
XPDRTLIC
XPORTLIC
XPDRTLIC
XPDRTLIC
XPOflTLIC
PETERSON, H R
PETERSON, M R
PETERSON, 11 H
PETERSON, H R
PETERSON, 11 R
8007150012
8007 1 50062
8007 1 50063
B007 140577
B007 14057?
XPORTUC
XPORTLIC
XPOflTLIC
XPOflTLIC
XPORTLIC
PETERSON. H R
PETERSON, 11 R
PETERSON, M R
PETERSON. M R
PETERSON, M R
B007 140586
8007220114*
8007340042
8007170077
8007 170080
XPDRTLIC
XPDRTLIC
XPORTLIC
XPORTLIC
XPORTLIC
PETERSON. M R
PETERSON. M R
PETERSON, M R
PETERSON, H R
PETERSON, M R
8007240046
8007340052
8007S80517
8007310199
8007240373
XPORTLIC
XPORTLIC
XPORTLIC
XPORTLIC
XPORTLIC
PETERBON, M R
PETERSON. M R
PETERSON, M R
PETERSON, M R
PETERSON, H R
B00724040B
B0072404la
B007340431
80072507 14
B007380535
XPQRTLIC
XPDRTLIC
XPDHTL1C
XPORTLIC
XPORTLIC
PETERSON, M R
PETERSON, K R
PETERSON, M R
PETERSON, M R
PETERSON, M R
8QO73B053S
8007280569
80Q7340363
8007240370
8007340379
XPORTLIC
XPORTLIC
XPORTLIC
XPORTLIC
XPORTLIC
PETERSON. M R
PETERSON, H R
PETERSON, M R
PETERSON, M R
PETERSON, 11 R
80072404 to
8007230363
8007380289
6007380293
B007230719
XPOftTLIC
XPOflTLIC
XPORTLIC
XPORTLIC
XPORTLIC
PETERSON, M R
PETERSON, M R
PETERBON, M R
PETERSON, 11 R
PETERSON, M R
80O7330733
8007250041
8007250030
8007250033
8007260117
XPORTLIC
XPORTLIC
XPORTLIC
XPOHTLIC
XPORTLIC
PETRICK, N A
PETRICK. N A
PETRICK. N A
PETRICK, N A
PETSICK.N A
BQD5Q900S3
6007OI0162
B007100441
6007020378
BOO7070323
50-462 S
50-482 Q
50-482 G
50-482 Q
50-482 S
PETRICK-N A
PETRICK, N A
PETRICK, N A
PFAFF,S J
PHILBRICK.S S
00073 10302*
BOO7390590
80O730091 1
S007230020
0097180609
50-482 S
90-482 S
90-482 A
40-6659
50-70 0
PHILLIP8.H B
PHILLIPS, L
PHILLIPS, D L
PHILLIPS, H B
PHILLIPS, L E
8007010212*
BOO? 100073
80070S0302*
8007330292*
8007020734
90-498 Q
TOPHEP
50-H98 S
90-498 0
TOP REP
PHILLIPS, L E
PHILLIPS, J
PHILPOTT, F T
PHILPOTT, F T
PHILPOTT, F T
B007I60B11*
8007330908
8007070323*
8007080207*
8007 S 10363*
REOOD
50-275 0
50-369 B
50-270 B
90-269 S
PHILPOTT. F T
PHILPOTT. F T
PHILPOTT, F T
PHILPOTT. F T
PHILPOTT, F T
6007180336*
8007210421*
8007E10470*
80072 10& 17*
8007320427*
90-270 E
50-369 S
90-269 8
50-2S7 S
50-349 G
PHILPOTT.F T
P1ACSEK, B E
PIAC8GK, B E
P1CKARD, W C
PIELAGE, H W
8007390640*
8007350012*
800734023a*
8DO7070092
S007240375
50-387 B
40-4337
40-4337
CONTRACT
PR
PIERCE, D A
PIERSON, Q H
PIGOTT.D R
PIOOTT, D R
P100TT, D R
S0071 50490
80O7310169
8007140034*
8007140034*
8097300359
50-260 J
40-4492
50-361 G
50-361 0
50-361 0
450
PERSONAL AUTHOR INDEX
AUTHOR
ACCESSION
flUMQHt
SUBJECT
CATEGORY
PILANT, J M
PILrtNT, J M
PILANT, J M
PILrtNT, J H
PILANT, J 11
B00703QI79
9007100016
8007210153
BQQ7!60iMO
B0072UQ452
50-293
50-299
50-299
50-299
50-2?8
0
0
o
p
p
PIRTLE. 0 L
PIIJTLE, 0 L
•PIZZ1CA.P A
PLMiJP, T J
fLANT.R L
BQ0701057B"
B0071SOQ96-
000720015?
tJOO/320122
BQ07O7O2i3
70-1308
70-2609
UUREQ
50-123
50-10
Q
[)
PLASKOH.H E
FLASKON.H E
PLATO, P
PLATO. P
PLATO. P
BOO/OtOOife
B0072105IS
BQ0723Q223
SOQ716Q2SO
BO 07 0206 59
50-5 li
50-S16
JJES
RES
pn
a
0
PLATO, P
PLATO, P
PLEASANT, J C
PLEBSET, M B
PLE3SET, M S
BQ071 10543
0007330330
0007070371
a005 150676
Q007I6O691
OfiG
CONTHACT
IJUflEO
A ens
PflDJ
PLESSCT. 11 B
PLESSCTjII S
PLESSET, 11 9
PLESGET. M B
PLESSET. M 8
BOQ616QOS9
BQ070 10359
B0072102<1B
8007210531
60073 1033-1
ACHS
MRS
50-327
50-327
ACR9
a
a
PLEB3ET, 11 S
FQCHAL.H F
POCHAl ,11 F
PCKHALfU P
POINDEXTEt.C II
B 0072 10533
0Q07O1G102
0 00702 065B
3007070041
800723Q175
ACFiS
XPOHTLIC
XPD-RTLIC
XPDRTLIC
PR
PD.IRIER.M R
PDIJUER.H a
PQLK.P J
POLLAHD.R
POLLARD, R D
BQ-0/150449
BOQ7150441?
H0072D03S31
800729OQ12*
8Q070BC030»
50-443
90-443
90-333
SECY
SO-2B9
11
u
p
0
PDLLAND, R D
PDMEflQV, D L
PQND.Q D
POOLE, D C
PQPEO, D J
B007290D03«
6007010344''
0007020356
BO 07310382
B007IOOI30
QRG
FOlf,
PR
30-302
cnn
0
PQiUEtt, W L
PORTEft. W L
POUTER, W t
POTAPQVB, U
POTAPOVS. U
6007240359
8007030183
aQ07Sio4/6
60O73I019-5"
S0073I0108*
PR
30-413
SO-413
OA99"?
QA999
A
A
PQTAPflVB, U
F-oTAFovSi u
POTAPOVB, U
PQTAPOVS, U
POTAPQVB. U
0007140093*
00073101/6*
aoo7oioi5'i*
8007300192*
SQ073S009&*
OA999
OA999
OA999
&A999
OA999
POTAPDV3, U
POTAPOVfl, U
PQTAPBVa. U
•poTApaYs. u
POMPOUS, U
B00720QQ03
BQ07arJoiBi»
Ei007HOOii3«
600716013,1
8007010147*
OA999
QA999
OA999
QA979
OA999
POTAPOVB, U
POTAPQVS, U
POTAPOVS, U
PQTAPDVS. U
PQTAPflVS, U
B00714Q039*
H00716011S*
B007160193*
9007010031*
0007160404*
OA999
OA979
OA999
071999
QA979
POTAPOVB, U
POTAPOVB, U
POTAPOVS, U
POTAPQVS, U
POTAPOVS, U
B00716015Q
B00725oif)'i
P007 100333*1
B007I40IA1
0007250309"
0/1999
QA999
QA991!
OA9?7
OA"!?9
POTAPOVB, U
POTAPOVB. U
POTAPOVB. U
POTAPOVS, u
POTAPOVS, U
8007210357
800731 0269
£!007P20H3»
0007210536
0007OIOI3Q
OA999
Q/l<?79
QA999
OA999
OA979
POTAPQVB, U
POTAPDVS, U
POTAPBYBiU
PDTAPOVB. U
POTAPOVa, U
6007220 19fta
6007300310
000730031^1
B007I00326
B007290327
OA999
OA99?
QA99?
OA91??
OA97?
POTAPOVS, U
POTAPOVS. U
POTAPaVSjU
POTAPQVBfU
POTAPOVS. U
B007290307
B007290474
GO 072500 52
H0073I0174
B007I 40037
OA999
QA999
QA999
Qft99'7
OA999
POTAPCJVa.U
poivwavs-u
PQTAPQVS, U
PQTAPQi/S. U
POTAPWS, U
Q007S90B34
3007300102*
BOO 7 140033
SOO 7290842*
6007010015
JA999
QA999
OA999
OA999
OW99
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEOOJIV
POTAPOV8, U
PQTAPOVS, U
POTAPdVS, I)
POTAPQIJ3, U
POTAPQVS.U
B007 160096
B007160177
0007290378*
H007 160393
9007290SB2
QA999
QA999
OA997
QA999
QA999
POTAPOVS, U
POT/lPOVS, U
POTAPQVS, U
POTAPOVB, U
PQTAPOVS, U
B00723-0153
BOD?aa013f,
43007220183
S007300I73
B 0072V 0338
QA999
OA999
OA999
QA999
OA999
POTWdVS, U
POTTER, J P
POTTER, J P
POTTER, J P
PDTTHOFFiF H
COOV300300
B0070 10306*
B00701029H
B0071S0471*
BOO? 10027 6*
Qft999
50-S19 Q
50-334 Q
50-280 Q
50-46fa 0
POWERS, 0
PRATT, C H
PRATT, G 11
PRATT, C M
PnEHSTEC.B J
8007030171
0007230362
B0072201&0
6007390523
BOO 7020 577
PR
Pfl
50-247 0
30-S47 0
30-499 11
PRICE! D S
PHITCHAF1D,G C
PliOOM. » C
PROOM, B C
PURCELL, J F
B0071S0511*
BOO? 100 093
S007100134
S007210442
B0072SO 1 4 1
30-302 Q
PR
PRM
M1SC
30-3*7 R
PUSCNEL.M A
QUATTROCCHJ, J
OUENNQI.S M
QUICK, £ R
BftCE, M A
B007350'iaB
B0071IOO17"
a0071IDfl34«
80&7240377-
000'70aOC-39
FOIA
30-32O J
50-346 fi
30-369 Q
50-329 0
RADOBEVIC, J R
FiAE, J B
RAOER.H
HAOER.H
FJAOER.H
BOO 70302 OB"
B0071 40040-
H0070302I7"
0007030233"
S007030241-
50-285 P
PR
50-331 B
50-331 B
50-331 B
RAGERiH
RMEH.H
nANUALUM Q
RANDALL, J D
RANDOLPH, M L
00071 104I9»
B0071 104B?"
B007100416
fl007a90<1fiB
3007020396
50-331 S
50-331 8
REOOD
50-12Q R
RES
RXlNDQLPH.H L
riflNSOHOFF. J rt
RAPHAEL, D
RA8IM,W. H
RATK3UN. 1) J
H007140044
B007330334K
B0072B067S*
0007! 40010*
B0073l049il
RES
71-121
30-409 0
50-369 0
40-299
RATHBUN.D J
HATHDUNi 0 J
RATHK.OPF, C
f?AUNER,L H
HAU3CH, J K
0007300279
00073002BB
BOO? 180464*
B007090377
Q0071O0432*
40-299
40-299
90-339 H
FOIA
SO-413 O
RAUSCH, J K
RAVENBCnOFr, 11
RAVHOND, W J
RAVHOHD, W J
fiERELCWSKI, T
0007250607*
00073 1030A»
Q007070373*
B007020940
B007E50332*
50-369 Q
FOIA
90-371 0
SQ-2V1 B
50-266 Q
REBELaH9KI,T
RECORD, D, J
RECDBfl, D J
REDUDCH, T W
REDHONO, 11 F
00072900SH
flQ07O10532»
00071 5048B*
B0071 40610
8oo7oioaea
50-5B6 S
50-327 8
90-327 8
N<Jtt£0
50-150 S
REED, B, R
REED.C L
REED.C
REED. C
REED.C
00070 103S5»
B0071104&5*
00<07ie0010*
B0070B021B
B 00707 0318
SO -320 P
HA3TE MOT
50-10 Q
TO PREP
50-237 P
neeo,c
REGD.C
HEEDED, D L
REEVES, E A
REEVES, It W
8007KS03S3
0007220482
D007t50409
B007010SB9f
B007020412
TOP REP
TOP REP
RES
50-2B3 P
PR
REOAN.W H
f!EOAN,M H
REHH. T A
REIfM, T A
REHH, T A
0007070031*
0007020 6S4
00070200^3
80071 100-10
BOQ716031&
50-514 D
90- 4 99 H
COMMIES ION
COMHISeiOtJ
COMMISSION
REHH. T A
F1EHM, T A,
REHH, T A
REHM, T A
REID, R V
80070901 ZS
00071 BOS 44
0007240207
0007300088
BOD9270M7
COMMISSION
COM'llBBIG-N
COMMISSION
COMMISSION
30-302 P
REID. R U
REID.R 14
REID, R U
REID, R II
REID, R U
6007010575
B0070200 i 9
6007160429
6007160434.
0007160453*
30-312 P
50-BB9 P
SO-269 P
30-2i9 P
90-369 P
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEOORV
REID.R M
REID, R W
REID.R M
REID.R W
REID, R U
8007100111
B007100H5"
B007100121*
B0070204BB
B007140123
50-302 P
50-302 P
SO-302 P
30-32 1 F
50-289 P
REID, R U
REID.R (J
REID, R U
REID. R U
REID, H W
B00702043S
8007070035
8007170054
B0071 70457
B007I70461*
50-277 P
50-S69 P
30-278 P
SO-346 P
50-346 P
REID.R U
REID, n a
REID.R H
REID, ft H
REID. R U
B007170477*
B007180115
B0071SO134*
80071 BO 13B*
8007210389
50-346 P
50-366 P
30-366 P
50-366 P
30-346 P
REID, R M
REID, H M
REID.R U
REID, R M
REID, R U
B0072 10333"
B0072 103400
6007 1 BO 125
80071 BO 133*
B0071G0149»
30-346 P
30-346 P
50-346 P
50-346 P
SO-346 P
REID, R H
REID, R a
REID.R U
REID.R U
REID, R U
B0071B0484
B0072BOI30
B0071S01S4
B0071H04S7
B007220320
90-321 P
SO-2B? 0
50-2B9 H
50-289 H
50-3HO H
flEID.R U
flEID.R M
REID.H W
REID.R U
FEEID.R U
8007230344
8007240334
0007240371
B007240392
B007240398
90-2B9 H
30-2B9 H
3Q-2B9 H
50-2B7 H
90-2B9 H
REID.R U
REID.R U
REID.R U
ReiD,R M
REID, R U
B007240404
B007240413
B007H40416
B007240419
8007240423
30-2B9 H
50-2B9 H
30-209 H
so-aa? u
30-289 H
REID.. R U
REID.R W,
REIDj R M
HEID, R M
REID. R M
B007240423
B007240238
B007240242*
8007240251 »
B0072S0109
50-28? H
50-277 P
50-277 P
30-277 P
30-346 p
REID. A U
REID.fi M
REIDHAAR.D L
REIDLINOERrB A
REIDLINOER.B A
SOQ7290B74
B007310340
B007090197
B007 140657*
B007 140663*
50-302 S
30-869 F
30-142 0
40-2940
40-3940
REIL, K 0
RETS, E J
REIS, E J
neiar.B D
REIZEN. M B
8007290132
B0070 10143
8007030240
S0070H0054
B007B90065*
NfJREO
30-376 0
50-309 0
30-329 0
St*tt Prog
REKEMEVGR.P C
REKITO, U A
REKITO.W.A
REMLEY.M E
REMPLE.L
800722002S
8007BE0060»
B007310131*
80072303SS*
B00721013B
WASTE HOT
30-219 a
30-272 ft
70-23
HASTE MOT
RENBEROER.D L
RENBEROER, D L
HEMDEROER. D L
OEMBEROER, D L
RENDEROER.D L
B00723Q007
B007250354
B007E90444
800729040S
8007230003
50- 80S ft
30-397 ft
50-46O Q
30-503 0
50-397 0
RENBEROER.D L
RENBERQER.D L
RENBEROER.D L
RENBEROER.D L
RENBEROER.D L
S007230623*
9007300299
B007300306
8007300544
B0070 10002
50-397 Q
50-460 0
30-30B 0
SO-397 0
30-397 A
RENBERQER.D L
RENBEROER.D L
RENBEROER.D L
RENBEROER.D L
RENBEROER.D L
BOO? 160489
B0071906BO
000729051 B
8007310171
B0071B0329
NUREO
30-397 A
SO-46O 0
50-397 Q
50-909 Q
RENBEROER.D L
REUBERGER.D L
RENBEROER.D LP
KEN££ROER,D L
RENBEROER,D L
8Q072SQ391
80073 1 0409
S0072 10392
8007250844
8007270704
30-397 A
30-397 A
30-397 A
30-460 A
30-397 8
RENBEROEH.D L
RENFRD.U
RENTFRQ. W
REQUA. 0
REQUA, 0
B0073O0344
B0071100BO
B0072205S2
B0071I0123
B007140465
50-30B F
30-466 0
90-466 0
30-309 P
90-309 P
REQUA. 0
HEVELEV, If T
REVELEV, W T
REVELEY. M T
REVELEV.W T
800709 03BB
B007090306
8007090306
S0071 70384
8007170384
30-309 P
50-322 0
30-323 0
50-3S2 0
30-382 0
PERSONAL AUTHOR INDEX
45'
AUTHOR
ACCESSION
MUM0ER
SUBJECT
CATEGORY
flEVELEYiW T
REVE3, L A
REVEB,L A
REYNOLDS- S D
REYNOLDS- 8 D
SOO7220446
B007210327*
B007300606»
B007020329*
8007260346*
HIBC
9O-346 0
50-3'16 0
50-334 0
50-354 0
REYNOLDS, B D
REYNOLDS, L E
REYNOLDS. N S
REYNOLDS, U S
REYNOLDS' W 3
8007300321*
BOO70f01B2
BOO7030246
B007030246
0007100437
50-3S4 0
27-47
50-445 0
3O-445 O
5O-445 C
REYNOLDS, N fi
REYNOLDS, R H
REYNOLDS, R H
REYNOLDS. R H
REYNOLDS- R H
80071B0437
B0072?OaOO*
B007290B27*
0007290416"
0007290672*
50-445 O
50-327 B
50-327 S
90-327 S
50-327 S
REYNOLDS. W Q
REYNDLDti.W B
REYNOLDS. R H
REYNOLDS. H 8
REYNOLDS. N S
8007270533
8007270533
80072706.73*
B00731032B
B0073I032D
5O-346 H
9O-346 11
90-327 Q
50-445 0
90-445 9
RHOAD8,0 &
RHODE, 0 «
RHVNE-C A
RtCE.H M
RICHARDS. J R
B0072 10355*
BOO 7090337
B007140489*
8007H70441
60070B0269
50-337 Q
50-410 A
9O-Z67 0
5O-I78 S
PR
RIDDLE, M H
FUDQUT.e F
RJEDEL, J T
RIEGER'S N
RlEOEti.B N
0007210416
8007340391
8007240409
8007010432
8007B90702
50-317 E
PT21
NUREO
40-B728
4O-B7.30
RILEY, J L
RILEY, J L
niLEY, R 0
RIPLEV'W I
RI8CHLINO. J L,
8007030036
0007030040*
8007310210
8007100160k
80071 80397*
90-367 0
50-369 G
HUREO
90-269 H
90-3 IS B
RIBCHLINO. J L
RITaHER. J A
RiTTa.r H
RIZZO.R R
Rirzo.p o
B0071S06'JS»
B0070B0010
0007210435
0007100312*
H007H401S3*
50-316 S
90-443 I
50-443 H
CONTRACT
50-31B S
ROQERTS, U J
(10UERT9, K
RDDERT8, K
RDDERT9, M J
RDBEHTB, J P
B007070162*
B007100I01*
B0072B0262*
BOO? 1500 16
B007180910
90-32O H
50-293 O
30-373 Q
RES
70-2623
ROBERTS, J P
ROBERTS. F P
RQBINSDNiR K
ROBINSON, M J
ROBINSON. F
6007230706
8007320019
800702070 1
0007140454
8007010539*
70-2623
NUREO
PH
PR
50-327 8
ROBINSON,!? K
RdDOERa, •>
AOBRIOUEZ'Ft J
KaECKLElN, A K
KQOERS.R F
80072000O9
S007160409
S007190S83
8007030373
Q007240292*
PR
PR
50-312 R
NUflEO
50-321 Q
RDOERQrR F
RQ(JER9,W L
ROOER0, H L
RDOER8, W F
ROQERB, L
0007100066H
H007020 1 20
00070301*70
P007010S72
0007290010*
90-321 Q
WASTE HOT
PR
XPORTLIC
COMMISSION
FOOERB, W, F
ROGERS, C S
ROGERS, U "
R018MAN, A Z
ROIBMAN, A Z
fl0071 10520
BOO/310133
9007110463*
0007270009*
000729P012"
XPORTLIC
90-596 0
50-321 S
SECY
6CCY
ROMANO, F R
HOMAN, T H
flOMIC.B
RtmlNE, D R
ROMINE, D
8007280179*
0007170361*
8007150110
8007010419*
0007010341*
50-320 H
90-BSO R
PR
90-327 B
90-327 S
ROMINE'P F
RDMINE.D
ROHINE, D
ROMINE. D,
fiO^IINC, D
8007010919*
0007010922*
a0070002BB*
9007000271*
0007280474*
50-327 B
90-327 B
50-327 9
90-327 S
90-3B7 S
RDMINE, D
HDHtNE.D
RDMNEY, N
ROOD. K
ROOD. H
0007290770*
S0072907I 5*
8007100140
6007070421
BQ07020200
50-327 B
50-337 8
30-337 P
50-3*1 A
50-361 A
ROOD. H
ROPNEY, V L
RQONCV.M A
RODNEY, V L
ROOMEY.M A
0007210093
00071000*7
8007020606
0007 1 40S2D
800714003S
30-206 P
50- 1 33 P
70-1308
90-271 P
70-1309
AUTHOR
ACCESS! OIJ
NUMBER
SUBJECT
CATEGORY
ROOflEY.JI A
RODNEY- 11 rt
RODNEY. H fi
RODNEY, H A
ftOONEV. 11 A
S0071.1003S
Q00722O13S
B007220147
Q00722016B
60072201 70
70-1308
70-1308
70-I30S
70-I30B
70-1306
HOONCV.H A
nOONEY, M A
RODNEY, M A
RODNEY, M A
ROOT, I. D
B00722013a
B007220147
B007220160
Q00722O170
S007020719
70-130H
70-1308
70-130B
70-1306
50-331 Q
RODT-L D
ROOT, L D
ROOT.L D
ROOT, L D
RDQT.L D
B007010453
Q007070?72
9007070)42
B007070252
6007160259
90-331 P
50-331 Q
50-331 P
30-331 P
50-331 0
RQQT,i- D
RODT,L D
RODT.L D
ROOT, L, D
RDOTiL D
8007160624
8007140.434
0007 140364-
9007250675
6007290677
50-331 P
50-331 P
50-331 P
30-331 0
50-331 0
ROOT. L D
ROOT. L D
ROOT,!, D
ROOT,!. D
ROOT.L D
0007170563
60072204^4
S00722O544
SOO 7260180
0007360377
50-331 a
50-331 Q
50-331 Q
50-331 P
90-331 P
nOSAUER.P J
ROSENTHAL, A J
flDSEKFIELD.A R
RD3B,D F
FIOSB.D F
BQ07020044
BD073B0205S
B007230201
B00701O149*
B00701OJ52*
71-5
50-10 D
NUREG
FOIA
TPIA
ROSS, D F
ROSS, D F
ROSS, D A
f!QSB,D A
ROSS.D M
8007010204*
800701019B*
8007IB0451*
B007IBOSB9
00072400fO
FOIA
FDIA
50-217 Q
50-217 0
71-3607
ROSB.D A
ROSS, D A
RQ8S, D A
ROSS, D A
R093, D F
B007070265*
B0071 10373*
8007110393*
0007230170
B007 160392
50-219 8
30-219 8
SO-219 3
50-219 Q
50-275 A
RQS9.D A
ROaZTOCZV, Z R
ROTH, J
ROTH. J
ROTH, J
B0073BQ363
B007030359
B007130163"
8007020131*
B00714060B*
90-219 R
TOPHEP
70-364
70-1100
H7-4B
RDTH, J,
ROTH, J
BOTH. A J
ROTHSERO, 0
RDTHFLEISCH. J
8007230212
0007B90003*
B007230798
0007100110
B007210243
50-245 S
70-1 100
5Q-3B9 (1
50-339 P
•10-93BO
ROTHFLEI8CH, J
ROTHFLEISCH, J
ROTHFLEIBCH, J
BOTHFLEiaCHi J
RQTHKCPF, C L
B007170SB3
B007230161
B007330279
B007300042
6007280140*
40-0300
40-9714
4Q-B200
40-0300
50-2B9 0
ROTHSCHILD. H U
ROTHSCHILD, 11 U
ROTHSCHILD, 11 U
ROUSE. L C
ROUBE.L C
8007S20D15
9007220009
0007230011*
0{J070ao423»
B0073IOQ42
70-1308
70-1308
70-1308
50-260 P
70-25
ROUSE, L C
HOUSE, L C
ROV, R
nov.fi
RQVTEH, c
B00721O310
B007S3O2BB
6007 HO 4 49*
BtOTlWVV?*
8007230276*
70-1257
70-1143
PR
PR
50-295 0
RUDDIPH. J P
RUEKDERO, H
RUHLMAN.W A
HUITER,0 H
nuoccHza.J P
8(J072BOfi22»
8007220393
800/220068*
80071405-)9»
9007070 1 34*
90-346 B
50- 1O D
50-333 0
50-305 fi
CONTRACT
iiUQCHE, D C
RU3CHE, fl C
RUSSELL, U B
RUSSELL, L B
RUSSELL, L B
00-07020331"
9007020336*
aoD7aA013S
00072B0451
a(J07Ka04i.1
COMMISSION
COMMISSION
50-319 S
50-317 8
50-317 8
RUSSELL, L D
BUSTLlMOi D H
RYAN, R 0
RYAN, R M
RVAN.R 0
0007300351
B007160A92
0007020099
8007090413
BQOToaOd'JQ
50-3 IB S
90-274 F
SUtfl Prog
REOOD
State Pvos
RYAN. R -0
RVAM.n 0
RYAN.R 0
RVAN, R -0
RYAM.R 0
8007020130
00070204^3*
8007070132
80071103 93"
8007020766
ORO
ORQ
ORO
COMMISSION
atate Prog
AUTHOR
ACCESSION
NUMB El?
SU9JECT
CftTEOORV
RYAN.R 0
HVAN.R 0
RYAN.M T
RYAN, R G
RYAN, H 0
8007 150044
eo0717&234
6007380095
BG071B039S
EC07I7035A
StatD Pmj
State Prog
HES
State Prog
Stato Prog
RYAN. R 0
RVrtN. R 0
SAHOL.A R
SAHA, P
SAIK1. T
BOO725052&
8007250301
BO072I0341*
BD071BOE45
BOQ7I003B1
State Prog
State Prog
50-337 r
HES
XPORTLIC
SA1K1.T
SAUTZMAHi J
BALTZMAN, J
BALTZMAN, J
SALTZMAN, J
8007110375
BQ071 10023*
aoo7uooas»
9007110021"
aoo7iioo2g»
XPDRTL1C
70- 1 333
70- 1 333
70-1333
50-28? J
SAUTZMAN, J
SALTZMAU, J
SAUTZMAN, J
SALTZMAU, J
SAUTZMAN, J
BOO 7V 10030*
S007U0037*
000/110040"
H0071 100331
S007140SS1
50-2B9 J
50-330 J
50-330 J
50-320 J
30-346 11
9AUTZMAN, J
BAt-ZRERO, H
SAMPLES' 11 D
SAMPLES, M D
SANOERB, C I
B0071 40234.
0007230257
3007140633
8007160623
BQ07D70't(>Si
50-346 M
40-299
50-145 M
50-449 «
PH
SANDVIK. R M
SANDVIH. B H
SANOER.H B
BANOEfl.H 9
0ANTMAN, U I)
000730036*
9007300372
8007100047
0007100050*1
S00714952I*
50-344 H
50-522 0
PR
PK
CONTRACT
SARSOUR, D
SAS9ANI, A
SA6TRE. C
3AUAR. T 0
SAUNDEflH, 0 A
6007 140322*
0007310063*
8007130340
BOO 7O 1024 4*
60O7O20273
5 0-3-1 A H
90-277 Q
RES
FdlA
40-0693
BAUrER,Q
8AUTER,G
BAVAQE,M R
BrtHYEH,R &
SAWYER ,H 3
9007140297*
0007100337
0007090400
aOQ72BOOfa7 *
a0072B0336»
FOIA
FCHA
REOOD
PR
30-3H9 H
9AWYER, E E
BC<\RANO, R A
SCAR AND, W A
BCiflRAND, fi A
SCrtRANO, R ft
S007180461*
80O73005bQ*
9007130074
eoO71OO'13l
8007100446*
so-sat H
40-8727
40-BAfB
WASTE MOT
40-B503
SCAHANO, R A
BCARANDiR A
SCARANO' R A
BCARft),O.P h
BCARAMO.H A
00072 102B 5
B0070 10261
S007&10539
a007\00<V«
8007240103
fl 0-8502
•1O- 1 162
40-1162
•UJ-BSQ2
•10-Q5B4
BCARANQ-R A
SCAR AND, R A
BCARANO'R A
5CARAIJO, R A
SCARANO. (I A
90070304'lfi
90071 901 3 I
a0072400I?f
9007020092
90O71 70436*
40-1162
•10-6623
•10-13-11
WASTE HOT
40-3749
SCARAHO.R A
SCAR AND, R A
3CWW4O.H A
SCARAND, R A
SCAR AISO, R A
9007300062*
9007140600
3QQ717Q433
9007130006
9007O10270
40-3749
10-8502
•10-8749
•10-B3BO
WASTE MOT
BCARAND, R A
SCARANO, R A
SCARANO, R A
8CARAHQ, R A
SCARANO, R A
90071000!"?
9007100450
9007310943
900731 OS4A
30O7S1005A
•10-B6BI
40-B5B4
40-i63?
40-B7I4,
40-BE02
BCftHANO.R ft
BCARMJQ, R A
BCARAMQ. R A
BCARAHd. R A
3CARAMQ, R A
UQQ7230O7 1
9007230077
0007330082
90072 3027 4
9007230318
4O-a502
40-BS02 '
40-BS02 |
40-3502
40-0502 ,
SCARANO.R A
BCARAMQ, R A
SGARAMQ, R A
SCARAMQ.R h
aCARANQ, R A
3007230642
0007330171
9007230! 45
9007230050
9007S30294
40-BEOH •
40-H399 ,
WASTE MQT
40-44-72 '
40-3200 .
SCARAMO.lt A
SCARAUO.R h
BCARANd, R A
SCARAMO'R A
8CARAMO, R A
300723071 1
0007290223
8007190303
a007S4030&
fl00730004S
40-ayaa
WASTE MOT'
-IO-84SH
•to-esas
4O-B390
SCARANO, R f,
3CHADE, A R
SCHAEFFER.M, R
BCHAEFFER.K R
SCHAFF6TM.L, R
0007230063
8007250140
9007230397
SOQ7SQ0103*
9007100^20*
40-85-02
PRdJ
XPORTL1C i
XPDRTLIC '
3O-IO P
4B2
PERSONAL AUTHOR INDEX
AUTHOR
ACCESSION
NUI1GER
SUDJECT
CrtTEGORI
SCHAUB, J B
B 00728 03iO
XPGRTLIC
SCKENDEL. K R
B00701O314
40-9599
6CHEHER.A £
6007110343
TOPREP
5CHERER.A E
9007030343
PR
BCHERER. A E
Q007100210
TQPREP
SCHERER.A E
B0070703S1
FJUREO
SC MERER, A E
8007030374
TQPREP
SCHEHER, A E
9007100219
TOPREP
SCMERER.A E
8007160491
NUREQ
SCHMIDT, E H
0007310193
RES
SCHMIDT, E U
B007310JB1
RES
SCHMIDT, A D
0007010193
50-333
S
SCHMIDT, A D
9007080334
50-335
B
SCHMIDT, A D
Q007H02B2
90-339
5
SCHMIDT. A D
B007 1 40364
50-333
S
SCHMIDT, A D
9007150627
50-335
S
SCHMIDT, ft D
8007240174
30-230
n
SCHMIDT, A D
a007IS0532
50-333
s
SCHMIDT, E IJ
8007290004
RES
SCHMIDT. A D
8007230419
50-350
s
SCHNEIDER. F U
80071 70'570
30-272
Q
SCHNEIDEF1-F IJ
B007170642
50-272
0
SCHMELL, D F
B007 100379
50-483
A
SCHNEIDEft, F U
BOQ7030349
30-272
P
SCHNEIDER, F U
9007310608
50-273
a
SCHNEIDER, F U
QD07S10S6B
30-272
0
SCHNEIDER. F IJ
B007 150431
30-272
0
SCHNEIDER, F U
80072 JO 553
50-372
0
SCHNEIDER, F U
8007140.129
50-272
F
SCHOLL, R F
8007160463"
30-10
P
SCHOLL,R F
6007230035*
30-10
P
SCHdPPMAN. H A
aOQ70I0491»
50-333
S
SCHdPPHAN, H A
9007080290*
50-335
5
SCHQPPMAN.M A
B0071403B9«
50-335
B
BCKOPPMAN, 11 A
8007140372"
30-335
5
8CHOPPMAW, K A
8007150636'
50-335
S
BCHOPPKAN, M A
30071 50536»
50-333
S
SCHRQEDER.F
B0070 10249"
FDIA
SCHULTZ, 0
B007 100333
30-367
H
SCMUNACHER.M C
8007310513"
50-295
0
SCHUSTEft, M D
8007330154
50-313
S
ECHWARZ, C E
0007310234
HUHEO
6CHUEND1MAN. L
B0070901B6"
70-1257
BCHWENDltWJ, L
B007210315I'
70-1257
SCHHENSFEIR.R
0007O7004B
70-33
SCHWEIKER.R 3
80071 10323*
MISC
SCHWEIDNINZ.E
B0071 60479*
30-5,16
0
aCHHEI&INZ.E H
8007230019'
50-436
a
SCHHENSFEIH, H
8007210173"
70-33
BCHHENCEft.A
8007030393
50-364
A
SCHWENCER.A
8007110033
SQ-27S
E
ECHHEMCEFi.A
B0070102B7
50-364
A
BCHHEMCER, A
EOQ701Q14B
30-390
A
SCHWENCER, A
0007070109
50-311
E
8CHWENCER.A
8007020473
50-364
A
SCHWENCER, A
0007020747
50-327
P
ECHWENCER, A
BQ070200B6
50-311
P
SCHMENCER.A
8007020012
50-327
P
BCHWENCER.A
8007020707
50-390
A
SCKUENCEn.A
8007020722
30-327
P
SCHWENCER h
BQ0710Q272
50-392
H
BCHHEKCER.A
9007110510
30-333
H
ECWWEHCEfl,fl
8007110576
50-443
F
ECHWENCEft, A
8007O30193
30-327
P
BCHWENCER, A
BQ07020673
50-361
A
aCHWENCER A
8007 1 1 0326
30-539
H
6CHUENCER, A
B0071400H3
50-352
H
SCHWENCEH. A
B007 140053
30-443
D
HCHWENCER.A
8007160451
50-352
A
SCHWENCER. A
8007130091
30-329
A
BCHWEMCER.A
8007100334
30-395
A
BCHWEHCER, A
8007 1 70496
30-337
P
BCHWEtJCER, A
9007 1 70503*
50-327
P
aCHUE«CF,R,A
B007I70517*
50-327
P
aCHUEWCER.A
B007 100061
50-327
P
SCHWENCER, A
80071S0345
30-353
H
SCHUENCER, A
8007100593
50-327
P
aCHWEfJCER.A
60071B0596*
50-337
P
SCHWEHCER.A
80071B.Q399*
30-327
P
BCHWENCER.A
9007 170543*
30-538
0
SCHHENCER, A
8007170338
SO-32B
0
3CHWEMCFR, A
8007160019
50-339
A
SCHWEHCEF, A
6007230190
50-329
H
SCHWENCEH, ft
80072^0312*
50-327
P
SCHrfEHCER. A
S007240081
80-311
P
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEOORV
SCHHENCEFi, A
BCHUENCER, A
SCHWENCER, A
ECHWENCER, A
SCHUENCER, A
S007230004
B0072S047S
60072^0022
9007270322
Q0073 10460
50-353 H
50-352 H
50-327 0
50-416 A
30-311 P
SCOTT, U J
SCOTT, J 11
SCOTT, H J
8CQTT,W J
SCOTT, U J
B0071 40439*
B0071 70374
8007160587
90071B03B7
8007230337
PR
50-466 0
70-130B
70-1308
27-39
SCOTT, W J
SCOTT. J H
SEAL,H M
SEAL, H H
SEAL, H M
6007250442
0007300116
9007030096*
8007140108*
600714002B
27-39
50-466 0
90-443 H
50-437 H
30-367 H
BE IDLE. U C
8EIDLE.U C
BEIDLE.H C
BEIDLE.U C
9EIDLE, U C
Q0072I0137
9007130064
60071B049Q
(3007010203
8007110061
30-439 Q
50-49B 0
50-443 Q
SO-498 0
50-382 Q
SEIDLE.W C
BE IDLE, H C
5EIDLE,U C
SEIDLE.W C
SGI DUE, U C
B0070700B3
800710034?
9007110187
8007110329
8007140436
50-483 0
30-498 0.
SO-4B2 Q
50-445 Q
80-362 Q
SEIDLE.W C
BEIDLE,H C
SEICLE.U C
SEIDLE, H c
SEIDLE,W C
B007240333
B007180567
B007390724
8007140497
8007230270
90-490 Q
50-443 Q
50-4S2 0
50-443 Q
30-498 Q
SEIDLE.W C
BEIDLE.U C
SEIDLE, U C
SEIDLE.H C
8E1FERT, C W
B0072B0144
B007S90433
8007300391
8007390013
B007230023
30-383 0
30-3B2 0
50-3B3 Q
30-4B2 Q
CdHUlSBIGN
BEIKEN, B J
SEIKEN, 8 J
SEKULER, 8 N
SEMJLER. B W
SEKULER, S !J
B007290234»
8007300337
80070B0026
80071603B7
B0071803B7
30-492 S
30-462 A
30-367 0
70-1 306
70-1308
SEKULER, B N
SEKULER, 8, N
BEKULEft. S N
BELLS, D
SEHCEHAL.H E
9007230327
B007S30443
B007310133
B007 180283
8007140011
27-39
27-39
27-39
30-332 A
PR
8ENECHAL, H E
SERAHtAN,J A
SEftAOlAN'J A
BETHNEBS.E D,
BETLVUR.A V
8007250422
0007220205*
BQQ7230Q31»
B007110459*
B007S20334*
50-302 0
30-317 Q
50-277 F
HASTE MOT
30-303 P
QEYFR1T.K V
BEYFRIT.K V
BEYFRtT.K V
8EYFRIT.H V
8EYFR1T, K U
8007510324*
9007240348*
B007390492*
B0072S0316
8007230319
70-137
70-1062
OA999
50-4 3fl Q
30-49B Q
SEYFRIT.K V
SEYFRIT.K V
SEYFRIT.K V
9EVFRIT. K V
SEYFRIT, K V
BD07230331
B007350333
8007230358
8007140563
800714036B
SO-4B2 fl
SO-3B2 0
30-443 Q
30-29B Q
50-439 0
BEYFfllT.K V
SEYFRIT, K V
SEVFRIT.K V
BEYFRIT.K V
8EYFRIT,K V
8007240503
8007240309
9007240310
B007240311
6007240313
30-498 0
30-445 Q
90-3B2 0
30-438 0
30-4B2 Q
BEYFfUT.K V
SEVFRIT.K V
SEVFRIT.K V
SEVFHIT.K V
BEYFRIT.K V
B007030249
8007020233
9007020233
0007020239
9007020261
30-439 0
30-49B Q
80-443 Q
50-462 0
30-3B2 Q
BEYFRIT.K V
BEYFHIT.K V
8EVFRIT, K V
GEVFRIT, K V
BEYFR1T, K V
0007020263
B007020268
Q0070202&9
9007020273
B007310342
30-289 Q
30-39B Q
30-313 Q
30-367 Q
30-313 Q
SEYFRIT.K V
SEVFHIT.K V
SEVFRIT.K V,
BEYFR1T, K V
SEYFRIT.H V
6007210346
8007210348
8007310330
9007310351
B0070 10020
30-3B2 Q
90-402 0
50-885 Q
50-443 Q
90-3B3 0
BEVFfilT.K V
SEVFRIT.K V
SEYFRIT.K V
SEYFRIT.H V
SEYFRIT.K V
8007010033
B007010026
B007010028
BQ070 10037
0007010040
50-493 0
30-445 Q
30-498 0
50-498 0
30-313 Q
AUTHOR
ACCESSION
NUMBER
aUBv^CT
CATEGORY
SEVFRIT.K V
800701 0014
50-267
Q
SEYFRIT.K V
3007010049
SO-29S
0
BEYFRIT.K V
B007010033
SO-3S5
Q
BEYFRIT.K V
8007080673
50-498
A
SEYFRIT.K V
80072200-54
50-313
Q
SEYFRIT. K V
S00722009B
30-490
o.
SEYFRIT.K Y
9007230104
SO-430
0
BEVFRIT.K V
6007230109
30-482
Q
3EVFflIT,K V
8007230113
SO-3B3
Q
SEYFRIT.K V
8007220118
50-336
0
BEYFRIT.K V
8007220120
50-2*8
0
BEYFHIT.K V
8007220124
30-3Q3
Q
BEVFRITiK V
8007220136
30-267
Q
SEYFRIT.K V
0007220 12B
30-443
Q
BEYFR1T, K y
8007030318
30-3B2
A
SEYfRITiK V
8007160321
30-313
Q
BEYFRIT.K V
8007 160324
30-4S2
Q
SEVFRIT.K V
8007160327
30-302
a
SEYFRIT.K V
B007 160331
30-2Q3
a
SEYFRIT, K V
8007160334
30-445
a
BEYFRIT.K V
8007140404
50-430
a
BEYFUIT.K V
8007140410
30-39B
a
BEVFRIT.K V
0007290037
30-43B
a
'SEYFRIT, K V
8Q07390QS9
30-49B
Q
SEYFRIT. K V
8.007290066
30-482
a
SEVFRIT.K V
8007290069
SO-3B3
0
8CYFRIT, K V
8007290075
30-336
0
BEVFRIT.K V
8007290077
30-443
Q
SEYFRIT.K V
8.007010024
30-313
H
SEYFRIT.K V
9007280137*
30-493
a
BEYFRIT.K V
0007340031
30-313
Q
BEYFRIT.K V
0007240038
30-438
a
SEYFRIT.K V
S007240039
50-498
Q
SEYFRIT.K V
8007240043
30-402
a
8EYFRIT. K V
S007340043
30-382
a
BEYFRIT.K V
9007240047
30-2B3
a
SEYFRIT.K V
8007340031
30-298
Q
SEYFRIT.K V
8007340034
30-267
a
SEYFRIT.K V
S007240037
30-443
Q
SEYFRIT.K V
S007380I33
30-490
a
BEVFRIT.K V
8007170669
30-438
a
8EYFRIT.K V,
0007170673
30-482
Q
SEYFRIT, K, V
B007 170676
30-490
Q
SEYFRIT.K V,
8007170690
30-382
a
BEVFRIT.K V
B0071706B3
30-443
a
8EYFRIT, K V
8007230364
30-498
a
SEYFRIT, K V
8007330369
30-302
a
BEYFRIT.K V
B007230370
50-443
a
SEVFRIT.K V
B007K30373
30-483
a
SEYFRIT.K V
8007330376
30-46B
Q
BEVFRIT.K V
8007150007
SO-498
Q
BEVFRIT.K V
B007 130009*
50-498
a
SEYFRIT, K V
8007310324
30-383
Q
SEYFRIT.K V
8007310331
30-313
H
SMALLER. D V
800709020.9
30-316
8
SMALLER, D V
8Q073BQSIO
30-315
B
SHALLER, D V
8007 130386
30-313
B
SMALLER, D V
8007150664
50-316
B
SHALLER, D V
0007130542
50-319
R
SMALLER. D V
80071 30S35
30-316
R
SMALLER, D V
5007130696
50-315
B
8HALLEU, D V
8007310337
BO-316
B
SHALLER, D V
0007310399
30-313
V
SHANBAKY. M M
B007170347
50-320
B
BHANBAKY. tl M
80071 70S10
30-330
B
BHANBAKY, H 11
8007170383
30-320
B
BHANBAKY, H M
8007170364
30-320
B
8HANBAKY.fi M
9007170587
30-320
B
8HANDAKY,H M
9007040203
30-320
B
BHAPAR, H K
0007000036
FOIA
SHAPAR.H V.
8003270154
FOIA
BHAPAR, M K
8007290002
6ECY
BHAPAR, H K
0007230268*
40-299
SHAPAR.H K
8007160607
50-413
M
9HEA, J, R
80073 10260-
FOIA
BHEA.J R
0007090030*
10CFH
SHEA, J, R
B007090033*
10CFR
SHEA, d R
8007330019*
10CFR
SHEA, J R
8007030093
XPORTLJC
BMEA. J, R
S0072BOO7B
XPDRTLIC
BHEA. J, R
BOO 70301 S3
XPORTLIC
SHEA. J R
8007020734
KPORTLIC
BHEA, J R
8007140532
SECY
SHEA, d R,
8007130030
SECY
BHEA. J, R
B0071 40339
BECY
PERSONAL AUTHOR INDEX
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
SHEA, J R
BHEA-J R
BHEft, J R
SHEA. J R
SHEA, J R
S0071SOQ69
B0071 50034
B0072BOOfe2
BOO 7290 04 4
S007190B34
SECY
SECY
SECY
XPQRTL1C
KPORTUIC
SHEA, K M
SHEA, K H
8H£A,K H
SHEA, J ft
BHEA, J R
B007020453
B0070BOO21
BOO 7020 453
&007ZBOO86
00071 40 &83
50-367 0
30-367 0
5O-3A7 0
SECY
XPOBTLIC
6HEA, J R
BHEA, J R
SHEA, J R
SHEA. J fl
SHEA. J R
00071702-44
B007 170923
B007210009
B007230S57
B007230S66*
SECY
SECY
SECY
XPORTLIC
XPORTLIC
8HEA.J R
SHEfW R
SHEDLOBKY, J T
SHEEHAfJ, D P
8HEEHAN, D P
B007220214V
00072506 9i
0007310365*
B0070B0007
S007O70337
FOIA
XPORTLIC
90-245 Q
5O-320 0
5O-320 0
8HEEHAN, D P
BHEEHAN, D P
BHEGHANrD P
BHECKAH. D P
SHELDON, K P
B007070353-
B00707036S*
B007070371*
B0072B06 1 3
^007140387
5O-32Q- O
3O-3ZO- O
SO-320 O
50-320 0
PR
8HELDQN.K P
SHELLEV.W J
SHELLEY, W, J
SHELLEY, M J
SHELLEY, H J
B007 140387
B007030031
800701061 1»
8007110025
80070105'FO
PR
4O-B647
40-8027
40-2061
40-8647
SHELLEV.U J
BHELLEV.U J.
BHELLEY, W J
SHEPHERD, T A
SHEPHERD. T A
8007010609
B007290A34
B007230S64*
BOOV200073
B0072101B3
40-B027
4O-B027
70-929
4O-8452
40-8482
8HEPHEHD-T A
8HEPLEY, B E
aHEflBONDY, B N
SHERMAN, H D
SHERMAN, F L
B007210177
B007170103*
BOO 72 903 74
B007290I50
8007220327
40-0452
90-373 Q
7O-143
WASTE MOT
7O-33
9HERMAN.F L
SHERWOOD, 0 0
SHERWOOD. 0 0
BHERWOOD-0 O
BHERHOOD.O 0
B007230443
B0071A0703*
8007110-190*
800714006B*
S007010S07
70-33
30-341 A
SECY
10CFH
TOPREP
SHEW, D
SHEHMAKER,R E
SHIELDS, 8 W
SHIELDS- 6 H
SHIELDS, R 0
Q0071i020Q
B007010046*-
800702003 1»
B007010096
B007170Z75
CON Tit ACT
90-946 H
50-346 B
50~S46 A
PRM
SHIELDS, 8 U
SHIELDS, 8 W
BHIELDB, 9 M
BHIELDB, 9 M
SHIELDS, S »
B0071 40906
B007210058
H007 100229
800723023B
8007230093
50-546 0
30-B46 A
SO-546 8
50-546 Q
30-346 a
SHIELDS, B U
SHIELDS, S H
SHIELDS, S U
6WELDB,8 U
BHIHA, B,
0007220549
3007200391
BOO 7290397
B007200667
0007240030
50-S46 H
60-546 F
50-846 B
50-546 9
XPORTLIC
SHTMA.B
BHIMSHAK-R
6HINEFHJO.H J.
BHiaaiAS,J A
BHlSaiAB, J A
B0072400-36*
B007000300
8007230SE4
B007U049A
8007030232
XPORTLIC
90-409 P
50-10 D
50-K7E f
30-272 R
BHIVELY.C H
SHIVECV.C N
SHIVELY.C N
SHIVELY.C.N
BHIVELY.C.N
8D07O104140
0007000134*
B00714040S*
8007180690*
8007240150*
80-363 B
90-363 S
90-368 B
90-313 B
50-313 S
SHOLLY, S, C
SHOLLY,S,C
BHOLLY, a, C
BHDLLY, 8 C
aHOLLY. S
0007O20691
B007O2064Q
B007O30097
BOO? 11 0073
80070 B0007
50 -28 9 0
50-209 0
30-289 0
50-320 0
50-32O 0
8HDLLY, 8
SHOtLV, 8
SHOLLY, S
SHDLLY, 3
8HOLLY, S
8Q070S0694
S0070 70337
8007070353*
0007070363*
B00707037H1
SO-320 0
30-3SO 0
90-320 0
90-320 0
50-320 0
BHOLLY, 6 C,
BHOLLY, S C
SHOLLY, B C.
BHOM. F. J
SHORE), E H
0007140006
0007310138
0007 1 702 1 O
8007220006
S0072B0630
50-3BQ T
30 -2B1? 0
50-287 0
50-32O 0
30-367 Q
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGDRY
SHREVE, D B
SHRIVERjB L
BHRQEDER, F
SHUM.E Y
SHUM, E Y
a007020553*
8007310429
B00701024U
B007020514
8007280 i 79
CONTRACT
50-63 F
FDIA
70-2909
70-143
SHUM, E Y
SHUI1, E V
8HURTS, B J
SIEBER.J D
B1EFKEH.L J
B007030O3B*
00071 5091 B
800701 0&4E*
8007390540
80071 SOO59
70-1151
70-1153
50-263 S
50-412 R
RES
81EBEL, B U
SIEGEL, D L
SIECEL, E
BIEGEL, D L
S1EOEL, Q L
B00701O08S"
B007010103*
B0070101 19"
B0070E0149*
000701 DIM*
50-249 P
50-249 P
90-263 P
FOIA
FQIA
SIEOEL, B L
BIEGEL, B i.
BIE&EL, B U
BILB£KQrJ E
BILBERO.J E
B007O1O165*
80070101 69»
80070101 73»
80070206 B9
8007100191*
FDIA
FOIA
FOIA
PR
PR
8ILDERO, J E
SILBERO, J E
SILKEft. W D
SIMQUS, C B
SIMONS, C S
B0073004A3
B0073004A3
800717O311
8007090273
B007O8027B-
50-BB2 G
50-282 0
NUREQ
40-8056
40-B056
SIMPSON, A V.
SINGER. L N
81 NOEfl, L
aiHOEft.L N
aiNOH, J N
B007 1 1 0005
0007070104
80070800,61
aoo7iaotn
8007220065
PR
50-320 0
50-320 0
SO-320 0
RES
SINOH/H
SINKIW. L A
SINKIN'L
8INKIN,L A
SINK1N,L A
300722052A*
8007110001
8007300419
8007310145
Q007310149
30-40? P
30-496 0
30-498 0
50-496 0
50-490 0
BIRI.W E
6KARITHA, J
BKARUPA, J D
6KARLJPA, J B
SKARUPA, J B
BQ072S0023*
BOOT 10 0256*
0007310097
S007I10S37
8007280223
MISC
TDPREP
XPDRTLIC
XPORTLIC
XPORTLIC
BKORDHOO.P H
8LABACK. L A
BLEAR. D 0
SLEHMON3, D B
OLQAN, 0 E
8007020443
B0071S0342
B007140670
B007100112*
E007240393
FOIA
REQQD
50-209 P
CONTRACT
50-329 S
BLQBQDIEH,t1 J
BLUI8, B J
BMEDtfiA, C
BHEDI11A, C
BHfTH, C N
8007170337*
8007310179*
0007230349
000723O334*
B007100076*
70-1869
Oft999
71-131
71-121
70-143
BMITH. 0 H
EMITH, O H
BMITH, 0 H
BMITH.O H
BMITH, R L
B00715O190*
B007 100002
B00701O197*
BOOS020'572
B&0703O3tl
70-364
50-320 0
40-6789
UE
PR
SMITH.O H
SMITH, O II
SKITH.O t(
SMITH, 0 H
SMITH.O H
8007020106*
S007210299*
B006H0736
BO 070 1020 5
8007010299
70-1100
70-687
27-10
SO -334 0
50-219 0
SMITH, 0 H
8HITH, 0 H
SMITH, 0 H
SMITH, 0 H
SMITH.O H
B0072400S1?"
6007140604
B007 140693
B0072)0160«
B0070101BO
XPORTLIC
S7-4B
40-3940
70-33
40-6789
SMITH, 0 H
SMITH, R H
SMITH, P A
SMITH.O H
BMITH, P A
80 06260 3 62
8007390096*
80070IOS00
GO 0721 01 S3
8007030068
50-271 Q
90-3BB Q
COM TRACT
70- 1 1 43
CONTRACT
BMITH, P A
SMITH, R H
BHITH.fi H
SMITH. P A
BMITH, P A
GO 070303 93
BO 072004 OB*
8007020936
0007030369
BOO 7070021
CONTRACT
30- 2 93 0
30-213 9
CONTRACT
CONTRACT
SMITH, P A
SMITH,P A
SMITHrP A
SM I TH, P . A
SMITH, D R
B007070065
8007100010
8007100011
EC07020S72
S007IB0175
CONTRACT
CONTRACT
CONTRACT
CONTRACT
UEOO&
BMITH, P A
SMITH.P- A
SMITH.P, A
BMITH, P A
BMITH.P A
B0071 40590
8007110359
0007150043
0007150095
B0071S0060
CONTRACT
CONTRACT
CONTRACT
CONTRACT
CONTRACT
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGOHY
SMITH, H
8Q07020rt2fr
50-206
SMITH, C H
B007210UT
70-33
SMITH, I 11
B007Q20SB2
50-32? '
5(1 1 TH, G H
B00733001S
30-277
SMITH, 11 T
8007210090
40-8631
SMITH, R L
BQ07070346
SO-271
SMITH, R L
8007070247
50-371
SM I TH. R L
aoo70B0292
50-271 '
SMITH, F H
8OQ7HQ6rti
71-6387
SMITH, I W
8007090220
50-2B-? i
SMITH, P A
0007260530
conrR<icr
SMITH, R D
3007170660
WASTE HUT
3MITH, T H
3007230191
50-213
SMITH, R 0
9007310120
REOOD
SMITH, I U
6007 1 1 0324
30-289 '
SMITH, I U
8007220533*
50-239 C
SMITH, 0 H
B 00723 02 12
50-245
SMITH, 0 H
3007230316
I6E
SMITHSONrJ 0
80Q716O523*
50-327
SMITH, 0 H
80Q72900O1
70-1100
SMITH, I W
SOQ722O083
50-2B9 '_
SMITH, R L
60072 1044B
50-Z7I
BMITH, f? I.
B00725Q4BB
50-371
SMITH, H
H007S80446
50-289 (•
6WTH, W
6O07250452*
50-EB9 G
SMITH- W
B007K50426
50-2 S9 0
SMITH, W
B00725067B
50-253 U
SMITH, W
8007290739
90-289 0
SMITH, W
8007290753
50-38? 11
SMITH. W
8007290730
5O-329 0
SMITH W
8007290752
50-329 »
BMITH, W
B007290766
50-329 S
SMITH.R L
a0072B0661
50-271 F
OMITH.R L
80073103S5
&0-271 P
SMITH, P D
BOO 72404 78
tlUHEO
SMOKER, C S
BQ07I60474*
50-309 S
BMVTHiH P D
BQ07160402
PR
SNAPP.C
B007090218
50-275 H
6NIEZEH, J H
B007020144*
IIISC
SNQU, B f,
90071 505B4
50-244 1
BNOW, B A
8007160637
50-244 8
8NDW, S A
8007210443
30-344 S
SNYDER.T K
B007 30049 B*
50-237 Q
8NYDER, 7 K.
0007 30050 B*
50-237 0
SNYDER, T R
B0073Q050B*
50-237 0
SNYCERrO L
8007230 IBS*
50-320 H
SNYDER, D J
8007070151
90-320 H
SNYDER, D J
8007010290
5O-320 P
SNYDER. B J
BOO? 11 0272
50-320 P
8NYDEH. B J
00071 102BO*
50-320 F'
SNVDER, D J
9007110392"
90-330 P
SNVBER.B J
900707021 1
5Q-320 0
SNVDER, B 0
8007 1 00237
50-320 H
8NVDEH. E9 J
8007100193
50-320 P
SNVDEfl, B J
8007240138
SO -320 P
SNYDER, D J
B007IB0107
50-320 H
SNVDER, B J
B0072B0579
50-320 0
SNWDER.n J
D007210I2I
SO -320 H
SNYDER. 0 J
8007230293
50-320 H
SNYDER, B 0
3007230390
50-320 H
SNVDEft. B J
8007230311
50-320 H
SNYDEft, Q J
3007210033
90 -330 H
SNYDEft, B J
8007300006
50-320 H
SMYDER, B J
(J00730Q010
50-3BO H
BQHINK1, 3 11
800708004 4
50-4i6 0
SOHINKI.S H
G007140013
30-466 0
80HINK.I,S H
&007220021
50-466 0
SQH1NK.I, 3 H
8007220159
30-466 0
EOHINKI.5 M
8007300397
50-4fc6 Q
fiOHINHI.S 11
8007300404
30-466 0
80H!INIU,8 H
B007300423
50-466 0
BOH1NRI.8 N
B007300421
30 -466 Q
601WLDWSK1.*
8007200366*
XPORTLIC
BOLBRI&, C U
6007100363
IJUflEO
BOMI1ER, J C
B007240437
FQIA
EQMNEBDRN, M R
B007020d37
50-320 H
BOONC.A L
B0072fl0327»
70-1311
SOUCY.A R
8007010404
50-29 1
GOUDEF?, J L
B0072100(8
50-52B 11
SOUDER. J L
B007H31J109
50-440 H
I
BOUDER, J L
B0072100B4
50-2B-7 H
SQXMAN,K A
B0072'?fl051«
50-320 II
SPAWQENBERQ, C
BO 072300 IS*
70-1B4
SPANGLES, R <J
BOO7J5013b»
5G-2<3a Q
SPANMAU3. M
B0071400U
PR
PERSONAL AUTHOR INDEX
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEGORY
PANNAUS, W
8007290422
30-2BS
0
PflHKS, E
9007030335
40-B7HB
'EIS.T P
SOQ7170M7
50-27O
P
PELLHAN, 0 IJ
8007230264*
50-317
H
PENCER, 0 S
S007330627*
50-397
0
PENCE R, 0 B
8007 0201 SB*
50-3A1
0
••ENCER.O S
8007170365
50-553
0
PENCER, 0 8
BQ07 170330
50-361
0
PENCER, 0 9
S007 1 800 1 4
50-30A
Q
PENCER. Q S
000721 OSS 6*
30-928
0
PENCER, 0 S
BQ07O30131
9 0-361
a
PENCER, 0 B
B00724031B
50-20A
a
PENCER, 0 S
BOO? 3-1030?
SO-3-)4
a
PENCEfl, <? S
B007300313
30-361
a
PENCER, VI C
B0071606A4
SO-2BI
a
'ENCER, 0 3
00072105-13
90-328
0
'ENCEH. 0 B
8007330619
90-397
0
PENCER. 0 B
(3007240093*
SQ-3&1
a
PENCER, 0 3
BQ07310S05
SO-SSB
a
PENCER, W £
8007110390
5O-2B1
a
PEHBARD. R L
B0070700BG*
5O-10
Q
PESBARD. R L
800717Q1O3*
HO-373
a
PESBARB, R L
80072-3Q3BB*
SO-1O
a
PETH, 0
8007220121*
SO- 599
0
>ETH. 0
0007090118*
PR
'fHNOEfl.D
9006500071*
SO-4DB
0
PHINOER, D
9004200066
50-4B8
Q
'RINGEfl, D
B00702047S
30-4B8
Q
R1NQ..C A
90072 90S28
SO-266
H
FABLE, C R
B00728Q006
50-311
P
FAOQERa, H 0
B0072 50213*
COMHI6BION
rAHl.S*C R
B007E1061B
30-3S7
P
AHL.D 11
9007 1 30431
30-44S
H
lAHL.D M
8007190431
50-445
H
rAIFJER.C FI
8007IO'0264
SECY
FAiMIRIS, P,
0007110497
PH
fftMPLEY, N U
B006300373
90-416
F
rAKPLer.N u
30063-00382*
30-416
F
AHK.F1 M
9007070391
30-3B7
A
AfJKEY.Jt II
Q007 1 50629
50-361
F!
ARK.R H
9007330335
30-387
F
FARKEY. R Q
9007220126
30-261
V
FARKEY, R B
B00722044Q
30-261
B
FARKEY, H Q
8007220445*
5Q-?61
B
ARK'F) H
B0072900Q6
30-397
A
r EARNS, C F
9007170319*
FQIA
r EARNS. C F
BQ07290402
flO-1052
FCTOINO.O E
B 00703 0461
PH
FEELE.P W
0007130049*
70-1113
FEELE. T,A
0007170-368
SO-^09
0
FEEL.C.L
BOQ7B8Q323
so-adB
P
FEIN, E L
B007H0964
PR
F.ELLO, V
7904160336
50-334
P
•ELLO.V
0007250649*
50-103
H
£LLO. V
BOQ714009B*
30-397
a
FELLfl, V
8007140097
30-397
0
eu_a, v
8007090019«
8ECY
GU-Or V
B007I1058B
30-346
H
£LLOr V
S007I40169
so-aao
0
GLLOr V
6007030104
30-498
0
ELLO, V
B007Q10031
30-S46
H
ELLO, V
6Q070B0367
30-2 S>9
0
FELLOr V
6007140153
90-259
0
ELLO. V
6007020396
ao-aai
Q
ELLOr V
60071 40 ISO
30-321
0
[ELLOr V
B 0070900 13
30-346
0
FELLO, V
8007110131
90-354
0
ELLO- V
B007110214
30-346
0
rELLO, V
BOO? 100293
30-3-16
0
ELLO, V
B00710030B*
SO-B46
0
rELLOr V
80071 10 544
90-346
H
ELUQ, V
B007I6046B
1118C
rELLQr V
6007220 140
90-4BZ
0
euLOr v
6007200142
30-S46
A
FELLOr V
6007330433
50-4B2
H
ELLQ.V
8007380033
30-346
a
GLLQ, V
00072 I 0288
50-219
0
EULQ, V
8007H10343*
50-81?
a
ELLO, V
0007320174
90-293
0
fELLO, V
ew220i97»
90-293
a
ELLD, V
BOQ7220J9U
50-293
0
rei.i.o, v
8007230139
OA99-?
FECCQ, v
B007S30089
jo-Das
Q
E4.LQ, V,
6007300039
80-34
a
E(,UQ, V.
B007300040"
30-34
a
MJTHQR
ACCESSION
NUMBER
SUBJECT
CATEGORY
STELLO, V
StELLO, V
8TELLO, V
STENSVAAQ.J II
STEPHEN30N. B fi
8007C1Q28O
BO 07300044
B0072KO3B6
B00709004B
000701O497
30-293 0
30-271 0
50-319 0
PR
50-237 B
aTEPHENSON, B 11
BTEPHEM80IJ, B 0
STEPHEN3QU, B D
STEPHENaDN, B Q
SrEPHENSON.D D
80-0-701 OS 44
B007100179
B007I001Q7
S007IB0333
B00722O455
30-237 S
90-237 3
30-237 S
30-10 R
30-249 S
STEPHEWSON, B tt
STEPHENBQH, B B
BTECHENQQN.fi B
STEPHENS. C R
BTEPTOE.P P
80073)0430
80072BO557
8007220577
0007310493
B007300362
30-249 »
30-237 B
50-249 S
30-283 &
30-293 0
STEPTDE, P P
STEPTGE.P P
STERNDERQ, 0 It
BTERNSERO, D
STERNEIERO, B
B007I30O53
B007150O52
B007010I4U
BOO 7030343
B0071700B9*
50-133 0
50-155 0
30-293 P
30-330 T
50- 1 33 Q
BTERNBERO, B K
BTERN.M, C
BTERHaEflO, D 11
BTEflNBEIlO. D H
STERNDERO, D 11
B007240393"
B007210129
8007300293*
90O7310327*
80073003-23*
30-279 &
XPdHTLIC
30-344 0
30-275 0
30-34+ <l
STERN, H, C,
STERH. H C
BTEVENBOW, R L
sreVEHg.s c
BTeVENB.S C
(1007280393
B0073104B4
8007070 193»
8007070373
8007240130
XPORTLIC
XPQRTHC
70-1113
50-285 B
30-285 S
STEWART. R C
STEWART. K L
8TIEOLI7I, W 0
BTITT. B D
BTITT, B D
BOQ7140447*
8007210BOO
B00713071O
B007310O09
3007280603
30-382 Q
71-139
so-aao p
•NUREO
HUREO
STOCKS, H S
STOHFI.J P
STOHR.J P
STDHR, J P
STDHH, J P
8007020300
80070700 1 &»
8007030068
8007150471»
aoo7H02*a«
PH
70-143
70-1201
50-280 Q
30-32 1 Q
BTDhft, J P
BTDHJt, J P
STOHfti J P
BTOHB. J, P
BTDHR.J P
Q007210DSZ*
B00724O3A7
B007270400
B007E90B16
B0073009GO*
70-1151
90-348 0
&0-370 Q
30-328 0
50-32 1 Q
STOHRr J P
STDHR, J P
BTOHft. J P
BTOIBER. C R
3TO:BCR,C R
fl0072904OA
0007110530
800721 OOA2
C007110296*
000711O282*
27-47
50-321 0
70-1151
coiwsaiOM
COMMIE a I ON
BT01I)ER,C Jl
3TOLLER,S H
STONE, T A
8TQNE BURNER, W
STONE BURNKfl! W
B00701027B
B007070062»
Q007190S22*
B007030O11*
B007030OU"
CQMMIBaiDN
CONTRACT
50-327 P
70-2478
70-247iB
STONE, R J
BTONEBUSWEfl.lV
BTOHEDUflNER.il
aTONEJJUHNER.II
BTONE, R
Q0041109S3
B007030020*
B0073 101B3*
8007310496*
8007240440"
PR
70-2473
70-2479
70-2473
50-333 H
STONE. W A
HTONE.J C,
atRAHL. J F
STRAND. H 0
STRAND, hi 0,
B0072900S7*
0007300036
B007140031*
B00731O49B
B007310302
O.A999
TOPREP
Pfi
90-397 Q
30-397 Q
BTftASHA, J
STREET, P A
STREETER.J F
STHEETEH, J F
STRELDH, R,
a0071104B8
aoo7aioi3i*
6007220112*
B007S400IB*
B007070092
SO -329 H
SO-33O H
80-313 0
50-301 0
PR
8TRQND.T R
SU. T H
B\J. T M.
BDLLIVAN-R F
8ULLWAN, J. H
8007290048*
8007170473
5007230252
8007200404*
800-7130312*
atlta Prog
50-322 A
90-322 A
50-239 Q
30-327 S
BUMMERB, J
BUM, V H
SUMDARAK, R K,
BUMDAnAH, H,K
BUMDEmiAH, P H
0007290042*
B007020364
BOO 71 704 aO
BOO 7 1406 42
6007140230*
PROJ
RES
RES
RES
FQIA
BUN3TROM,n, F
BUTTON, 0 11
SHAN, W B,
8WAH, W. B
SHANflY^O.T,
80071 301 SB
aOQ7S10273"
8007240329*
S007300394*
80072S0291
PR
QA999
80-918 Q
30-518 0
40-3433
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEOOR'
l-
SWAN80M, D T
0007010257
50-522
0
SHANBOM, B R
8007140S5B*
30-346
Q
SWANBOM, D T
0007020469
50-70
0
SWANSOW, D Q
B007170618
(JUREO
SWANSDN, D T
8007010332
50-289
0
BWAMSON, D T
B007100216
50-2B9
P
BWAMSON. D T
8007330617*
50-289
0
BWANSdN, D T
8007310219
50-289
0
SWART, F E
B007020309
SO-267
Q
BWAftTZ. L L
8007010269
50-2B9
0
BWARTZ^L L
8007210503*
50-2B9
0
SMART Zj L L
8007030290
30-289
0
SMART Z, L L
8007030293*
50-289
0
SWARTZ.L L
8007030296*
50-289
0
BWARTZ.L L
8007030397*
30-289
0
SWARTZ.L L
8007030277*
30-2B9
0
BUAflTZ.L L
B007Q30301*
50-2B9
0
5WAHTZ.L L
B0070303Q2*
30-2B7
0
BHARTZ. L L
B007030303»
50-289
0
BWARTZ, L L
B007030304*
50-2S7
0
BWART,F E.
B007090333
50-267
P
aWARTZ.L L
8007090212
50-287
0
aWARTZ.L U
8007170370
50-289
0
SWARTZ.L L
8007220362
30-289
0
9WARTZ. L L
BOO 7220564
50-SS9
0
BWARTrF e
B0072B0493
50-267
P
SWARTZ.L L
8007230900
90-269
0
SWARTZ. L L
8007230609
50-289
0
3WARTZ.L L,
8007230614*
SO-289
0
3WARTZ.L L
80072506B3
50-289
C
SWARTZ.L L.
8007310315
30-289
0
8HAYNE, R W
8007100330*
QA979
3WEAHINQEN, J D.
8007010393*
30-327
S
SHEARINQEN. J 0.
8007130301*
90-327
S
SHETLAND, P
8007230378*
90-309
a
SW1TZER, D. C
B007300331*
30-213
p
aWVLER, K J
B0072IOOOS
REB
SYLVIA, B R
9007240009
30-338
F
SYLVIA. B R
B00702000I
71-3937
SYLVIA, B R.
8007090057
30-280
Q
BYLVIArB R.
8007090423
30-280
Q
SYLVIA, B R.
B007160462
30-280
a
SYLVIAS R.
80071 &0343
50-280
0
BYLVIA, B R.
8007010422
50-280
p
SYLVIA.B R.
8007030136
50-339
p
BYLVIArB R.
8007020436
50-338
p
BYLVIA. B R
8007020SB5
PR
&YLVIA.B R.
8007030131
50-339
p
BYLVIArB R.
S0073 10277
PR
BYLVIA. B R.
9007070800
30-339
E
8YLVIA.B R
8007210030
50-280
Q
SYLVIA, B R
8007070283
30-338
a
SYLVIA, B R
8007210092
50-280
8
SYLVIArB R
90070B0419
50-280
p
BYLVIArB R
8007100273
30-280
p
SYLVIA. B R
8007110189
30-2BO
a
SYLVIA. B R
8007110202
90-339
p
SYLVIA. B R
8007170334
90-290
Q
SYLVIA, B R
8007230343
90-2BO
Q
SYLVIA, B R
9007290B4Q
30-2BO
Q
SYLVIA. B H
8007100159
30-339
P
SYLVIA. B R
3007110336
30-200
0
SYLVIA, B R
. 8007110357
90-339
P
SYLVIA. B.R.
8007110361
30-339
P
SYLVIA. B.H.
8007140158
90-339
P
SYLVIA, B R
B007U01B7
90-339
P
SYLVIA, B R
8007140406
30-339
P
SYLVIA. B R.
8007190671
90-339
a
SYLVIA. B R
8007160307
30-339
p
SYLVIA. R R
8007160671
90-339
p
SYLVIA. B R.
8007 170 173
30-339
p
SYLVIA. B R
8007170389
90-280
R
SYLVIA, B.R.
8007170412
90-2BO
F
SYLVIA, R.R
BOO? 170327
30-290
0
SYLVIA, B R.
8007170601
30-33B
F
BYLVIA. B R
8007210439
30-2SO
P
SYLVIA. B R
B007 170348
30-2BO
V
BYLV I A. B R
Q007320431
30-338
R
BYLVIA'B.R
B007220487
90-339
P
SYLVIA, B R.
B0072 10244
30-339
P
SYLVIA, B R.
B0072I0337
30-339
P
SYLVIA, B. R.
8007210347
50-339
P
SYLVIA, B R.
8007210433
30-281
P
SYLVIA, B. R-
80072203B4
30-339
P
BYLVIA, B R.
8007230447
30-338
a
PERSONAL AUTHOR INDEX
455
AUTHOR
ACCESSION
NUMBER
SUOJECT
CATEGORY
SYLVIA, B R
8007240092
50-33B
F
SYLVIA, B fl
0007290220
50-280
0
SYLVIA.B R
8007240115
30-339
P
SYLVIA, B R
S007240I49
50-339
P
SYLVIA.B R
B00729Q415
30-330
P
SYLVIA.B R
B0072Q0399
50-339
P
SYLVIA.B R
B007230379
90-339
P
SYLVIA.B R
80072503BB
50-339
F
SYLVIA. B R
8007250430
30-339
P
SYLVIA, fl fl
8007280367
50-339
P
SYLVIA.B fl
000/280406
90-339
P
SYLVIA.B R
8007280423
90-339
P
0YLVIA, B fl
8007280440
50-339
F
SYLVIA.B R
B0072B0444
90-339
E
SYLVIA.B fl
B0072806bl
90-338
P
SYLVIA.B fl
8007290700
90-338
P
SYLVIA. B R
8007300499
30-339
P
SYLVIA.B fl
80073001B3
90-339
P
SYLVIA.B fl
B007300490
30-339
P
SYLVIA, a fl
B0073 10390
90-2B1
P
SYLVIA, a R
8007310346
90-339
P
SYLVIA. B R
B0073103B4
30-339
P
SZWAJKOHBKI.R
B0071 40030
70-1309
8ZWAJKOW8KI,R
8007140038
70-1 SOB
BIHAJKOWSKI.R
6007220138
70-1308
B1HAJKOUS*!. R
B007220147
70-1308
BZHAJKOHBKI. R
8007220 16B
70-1308
gZHAJKQUBHI.R
B007220170
70-1309
SZWAJKQWBK I ' R
8007220 130
70-1308
SZHAJKQWSK1.R
8007220147
70-1308
SZWAJROWBKI-R
6007220168
70-1309
SZWAJKQWBtU.R
BOO 7220 170
70-1308
SZWAJH.DH3KI.R
B007230519
70-1308
TAFT.J P
8007290475"
30-120
n
TAH,P
7906220 1B6
90-283
0
TAMBLINQ. T N
8007210327*
50-346
Q
TAMBLINQ, T H
8007240253*
50-338
Q
TAMBLI1JO. T H
8007300606*
90-346
Q
TAPIA, J I,
8007110190*
30-4B2
Q
TAPIA, J I
8007240337*
30-499
0
TAPIA, J
80071S0136*
30-290
0
TAPIA, J I
80072B01S3*
30-383
0
TARAS, D N
6007300066
PR
TAUCHE.W
8007220499"
TOPREP
TAHA, K
B007 100287*
XPORTLIC
TAVLOfi.C H
B007 100029*
70-143
TAYLOR. C H
B007 100044"
70-143
TAVLOR.fi 0
8007180574*
30-449
Q
TAYLOR. J J
8007110492
PR
TAYLOR, J B
80072802B9
FOIA
TAYLOR, 0 A
B007210017
RES
TAYLOR, J H
B007090199
TOPREP
TAYLOR. J H
B007300294
PRM
TAYLOR, J H
B0070B03I2
TOPREP
TAYLORjB J
B007230394
50-409
D
TAYUQR,J H
8007170417
TOPREP
TAYLOR, J H.
B007 170421*
TDPHGP
TAYLOR, J H
8007230239
50-320
8
TAYLOR, J H
8007240001
TOPREP
TAYLOR, L L
8007290149
NUREO
TEDEBCO.R L,
8007010227*
FOIA
TEDEBCO.R L
8007070579
30-364
A
TEDESCO, R L,
8007020302
50-410
Q
TEDE8CO, R, L
8007030175
90-389
A
TEDESCO, R L
9007030196
30-397
A
TEDEBCO.R, L
6007030197
90-460
A
TEDESCO, R L
B007030201
90-491
A
TEDEBCO.R L
B0070101B6
90-413
A
TEDE8CO. R L
800701 022B
50-993
A
TEDEBCQ. R L
B007010B37
30-41&
A
TEDE3CQ.R L
B007010243
30-461
A
TEDESCD-R L
B007010590
90-52B
A
TEDESCO, R, L
8007010557
50-329
A
TEDESCO, R L
8007010558
50-45B
A
TEJ)ESCO,R L
8007010960
50-361
A
TEDESCO, R L
S0070 10561
30-354
A
TEOEBCO.R L
B007010S63
50-311
P
TEDESCO, R L
B007020214
90-440
A
TEDEHCQ.R L
0007020219
90-363
A
UOESCCl.R U
8007020227
50-499
A
TEDESCO, R. L
8007020229
50-327
P
TEDEBCO, R, L
BOO7030232
so-asa
A
TEDE9Cq,R L
8007020232
50-918
A
TEOEBCO, R L
8007020297
30-332
A
TEDEflCO,R L
8007020869
30-514
A
AUTHart
ACCESSION
NUMBER
SUBJECT
CATEODRr
TEDESCO,fi L
TEDEBCD.R L
TEDEBCO.R L
TEDHSCO.R L
TEDE3CO, R L
80070203^0
8007110570
8007210186
80072400*6
3007SB0399
50-364 A
SO-SIB H
50-322 A
50-445 A
50-364 A
TEDESCO, R L
TEDEftCO. R L
TEDESCO, R L
TEDESCO, « L
TEDESCO. R L
80072 -70202
8007230 15A
Q007300033
B007300077
B0073000BO
30-364 A
5Q-33B F
5O-373 A
50-369 F
90-438 A
TEDESCO, (i L
TELFORI). J T
TEMME, K E
TEHNEV.H B
TEUFEL. P
B0073 10330
B007110350
9007210163
30071 1021B*
8007020534*
30-369 A
TOPftEP
40-2359
TOPREP
30-330 0
TEUFEL, D
THEOFANUS, T 0
THIES, A C
THOHr T
THOMAS, R D
8007190042
B0070903BO
6007140463
B0071A0336*
6007100003*
90-3SO P
FOIA
50-269 a
50-2S9 ft
90-320 0
THOMAS. R D
THOMAS, R D
THOMAS, R D
THOMAS, fl D
THOMAS, Ft D
8006110739*
B0073 10339*
8007140657*
a007I40663»
60071 7055A*
27-10
50-395 0
•40-2940
10-2940
5O-31S Q
THDNAB, ft D
THOMAS, R E
THOMAS, M
THOMAS, R D
THOMAS, R, D
800714G670*
B007250390*
B0071SO-452*
6007160721*
B0072-1O331»
40-2940
50-397 A
50-566 ft
40-7982
70-1237
THOMAS, H N
THOMAS, R- D
THOMAS, W N
THOMAS, J 0
THOMAS. W H
6 007030 07B
6007070070
6007010430
8007310153
8007020592
PRM
30-344 S
50-2HO P
50-556 0
30-339 P
THOMAS, H H
THOMAS. C 0
THOMAS, E B
THDMA8,H D
THOMAS, B, D
8007090326*
H 007280089
B007 170393
B00724OI38
B0072t?O330
50-213 B
50-275 A
50-220 F
E&E
27-4B
THOMPSON. D
THOMPSON. H L
THOMPSON. H A
THOMPSON, M A
THOMPSON. H E
G004240316
B007230236»
600702023 [
BOO 7020 708
a0072301?5»
IS.E
FOIA
WASTE HOT
WASTE MOT
50-2B9 F
THOMPSON, C 11
THOMPSON. D
THOMPSON, D
THOMPSON. D
THOMPSON. D
9007330503H
80071405SO
B007230143
8007230149
8007340133
TOPREP
50-219 S
IbE
50-S4 S
50-26? S
THOMSEM. F T
THQMSEN, F T
THOMSEM. F T
THOMSEH. F T
THORNBUflOH, D
B007100171
8007230797
B007230777
B007250331
B0070203I3*
30-522 0
30-9S2 0
50-D32 0
50-322 0
50-320 U
THORPE. J R
TIEPEt,,E,W
TIEPEL, E W
TIEPEL, E W
TIERNCY, F P
S0072403S.7
H0072I0171
80072IO093
8007220303
80071&066O
PR
4O-8902
40-0SOH
40-D304
50-382 B
TIERNEY, F P
TILLMAN, A
TILLHAH. A
TIMKQ, D R
TOBIN.W J
8007290340
8007190I07«
B007110II3»
B0071flO4S2»
B0070100B9
50-2B2 S
30-361 fl
50-335 0
50-334 R
30-337 S
TOHIN.M J
TOHtN.W J
TODD, U E
TGKAR.K
TOKAR.H
B00711O4I3*
80071 607 fr I*
B007H1O25?
B007Q101QH
B00701021B*
30-335 Q
50-338 Q
PR
FOIA
FOIA
TOKAR.H
TOLLISOM. A C
TOLt-ISON-A C
TOLUIBOM. A C
TDLLISON, A C
B0070103a2»
8007240196*
B00710O377X
80070 10S3 6
BQ07QlO5d4»
FOIA
30-334 0
9O-324 Q
50-335 B
3O-32S S
TOLLIEOM, A C
TOLLISDM, A C
TOLLISOM, A C
TOLLISOM, A C
TQLUI60M, A C
B007010501
B0070l050?»
B007010313
B007010521*
B007020334
&0-325 B
50-329 B
30-325 S
30-323 S
SO-324 8
TOLLIBOM. A C
TOLLIBOMi A C
TOLLISON. A C
TOLLIBON, A C
TOLLrBON. A C
8007020341*
a0071fiO&32
8007070234
B007O7Q237*
S0070B0180
30-324 S
50-334 S
50-325 3
50-335 B
50-325 S
AUTHDB
ACCESSION
NUMDER
SUBJECT
CATECDJiV
TaLLISON. A C
8007000185*
20-335
3
TOLL15QN. A C
80071 1C4O5
50-334
ft
TOLL I BON. A C
6007110393
50-324
S
TOLL ISDN, M C
000714O399*
50-324
s
TDLLISQN.rt C
13007150493
SO-334
a
TOLL. ISDN, A C
00071 50454
50-325
a
IdLLlSON. f\ C
8Q0715OA£5»
50-323
5
rOLLIBON, A C
BC07220464
30-324
a
TOLL I SON, A C
BOO722047OJ
50-324
s
TQLL1SDN, A C
BC07220S21
50-324
s
TOLL3&DN, A C
3007250334
50-324
s
TQLL3S-DM, rt C
8007250341"
50-324
s
TOLLSSCU, A C
9007390836
90-325
s
TGLLiSOW, A C
8007290B33*
50-325
B
TaLLISON, A C
8007290623
50-325
B
TOLLIEON, A C
B007290B31*
30-323
B
TOME. A
0007280503
M DP EG
TOME, A
B00723O2O5
NUREO
TOHLINSON, D P
B007110447*
50-3B2
Q
TOHLINSON, D P
B0072BOL53*
50-3B2
Q
TOMPKIN3. B A
B007020646
SO-295
0
TOMPKJHS. B ft
3007300408
50-344
0
TONQUE,T M
Q007O70080*
30-1O
Q
TCOLE'R J
8007330615
50-239
B
TDDLE. n J
BOO 7280483
5Q-2B9
B
TOURTELLOTTE, J
BOO? 070 133
•30-275
Q
TOURTELLQTTE, J
B007 160394
50-289
Q
TOURTELLOrfE, J
8007230536
30-275
0
TRASESER.C H
800710010?
CONTRACT
TRAQE8ER,': 11
8007300584
90-390
A
TRAMMELL, C
B007 020021
50-344
P
TRAMMELL, C H
600714053*?
50-34-1
F
TFtAVCESa-BIAI
BQ0715055A»
90-312
0
TRAVIESO-DIA2
aOQ71S0556»
50-31K
0
TRAVIESO-BIAZ
8007250393
30-320
G
TREAKLE, K
8007020127
FOIA
TREIBEt-, W C
a007fl2Q02S*
CONTRACT
TREVINO. T
0007010382*
CONTRACT
TREVINO, T
8007140650
FOIA
TRIBBLE, J E
8007170323
50-271
0
TR IMBUE. !> C
BOQ7020174
50-313
Q
TRIMBLE, D C
BOO 70202 10
SO-313
P
TfUMDUE, [> C
B0070Z0003
71-39S7
TRIMBLE, D C
B007020201
30-313
a
TRIMBLE, t> C
300701 03 5i
50-313
p
TRIMBLE.!) C
9007010369
50-313
F
TRIMBLE, J) C
8007010527
5D-3tB
B
TRIMULE, D C
G0070 1 043d
50-340
3
THIMBLE, D C
B0070 10470
30-313
R
TRIMBLE, D C
B0070 10407
30-368
3
TRIMBLE, D C
B0070 10437
50-36B
S
TRIMBLE, D C
30070701 4B
90-313
F
TRIMBLE, D C
0007080160
50-3t0
S
TRIMBLE, D C
8007080171
SO-34S
5
TRIMBLE, D C
90071B0095
71-910B
THIMBLE, D C
8007300335*
90-313
a
THIMBLE. D C
S007I00143
90-313
R
TRIMBLE. D C
B0072B0646
50-360
3
TRIMBLE, D C
S0073000S5
PR
TRIMBLE. D C
a007O7Q393
90-313
P
TRIMBLE, D C
B0070902B7
50-313
P
TRIMULE, D C
aoo7iG0ii29
50-313
P
THIMBLE, D C
B0070B0144
30-360
B
THIMBLE,!) C
8007300335*
90-313
a
TRIMBLE, D C
8007090338
50-369
3
TRIMDLE.D C
B007100HB
90-313
H
THIMBLE, D €
BQ0714&394,
50-360
B
TRIMBLE, D C
B00713064I
50-313
S
THIimE. D C
B00716&34S
50-360
P
TRIMBLE, D C
B00715&647
SO-360
S
TRIMBLE, D C
8007130683
50-360
s
TRIMDLE.D C
a 007 IS 0-394
50-313
p
TRIMBLE, D C
S 007 15 0595
SO-313
8
TRIMDLE.D C
8007150-530
50-313
B
TRIMDLE.D C
B00717O201
50-313
F
TRIMBLE, D C
BQ07220495
50-313
Q
TRIMBLE, D C
BOQ72906Q3
50-313
P
TRIMBLE, D C
B0072 10396
50-36B
B
TRIMBLE, D C
0007240120
30-313
P
TRIMBLE, D C
B007SI03B1
50-360
R
TRIMBLE, D C
B0072I0420
50-313
H
TRIMBLE, D C
BOO 7H I 0406
30-313
B
TRIMBLE- D C
B00724Q176
50-313
S
TRIMBLE. D C
BQ071S0312
50-313
3
TRIMDLE.D C
BOO 734 0148
50-313
B
456
PERSONAL AUTHOR INDEX
AUTHDfl
ACCESSION SUBJECT
NUMBER CATEGORY
TRIMBLE, 0 C
TRIOLQ.K
TRIPP.C. £
B0072B0504 50-313 S
B007020153 XPORTLIC
6007020223* 50-334 a
TRIPP.L E
80O7J 70615* 30-337 a
TRIPP.L E
B007S202B5* 50-3 1 7 0.
TftlPP.L E
S007300328* 50-219 0
TBIPP.L E
3007SSO244* 5Q-354 fl
TRIPP L E
TROJArraWSKl.R
TROJANOUB«I,H
9007300321* 50-3 5fl Q
9007110276* 50-321 0
S00734O374* SO-34B 0
TR.OHBETTA, R
BOD714Q33B BO-32O H
TftQMBETTA. R
TftQHBETTA, R
8007140516 50-320 H
8007310299 50-320 P
TR9SKC5KI, W
SDO72 1 O255* SO- 333 3
TftOUP.O L
B0072"?O4o ] * 50-259 3
THBUP.O U
B0072"?O4tO* 27-47
TRGWBRitJOE, G F
80070S04B2 50-320 Q
TRDWBR I BSE. 0 F
TRQWBRIDGE.O F
B00702062] 5O-32O Q
8007O204B2 30-32O ft
TROWBRItHJE.O F
3007030621 SO-32O 0
TROWHR1DQE.G F
8007140006 50-32O T
TROUGH I DOE. Q F
TROWBRIDGE.O F
TRUBATCH. B
90D72306O4 5O-2B9 9
9007230604 SO-289 0
300724OI37* IJUREO
TRUSSELL. H H
90071 70679 lo-aias
TUITE.P T
aQD7l7QSBtH SO-2tf 0
TUHA. A T
a007lO0116 REGOD
TUJJK, S E
9007030291 70-2909
TURK, S E
00071 7024] 50-445 3
TURK, S E
B007230741 50-443 Q
TURK.S E
B00723074B 50-44S 0
TURK, S E
B00725O436 70-2907
TURK 8 E
BO 070303 94* 7O-29O9
TURNER, E A
B007I 50075* 50-498 0
TURNER. E A
B007010072 50-498 Q
TURNER. E A
BQQ702067B* 50-493 A
TURNER, E A
B0071O0433 50-498 B
TURNER. E A
B007100443 30-493 S
TURNER, E A
8Q07J6Q219 30-498 5
TURNER. E A
60O707O3O6 50-493 S
TWEEB,R M
S007300545 IOCFR
TWEED, R M
8007300533 IOCFR
TWEED. R M
B007300537 IOCFR
TYE,L S
80070J 02B4 OR&
UDALL.M K
S0071B0431* COMMISSION
UDALL.M K
800? 1 B0427* CCMMISS ION
UDALL, M K
9004280239 50-352 U
UDALL.ft K
B00711OS09 PHM
UDV.A C
B00725030A 50-325 P
UDY, A C
B007290163 50-324 P
UHR 10, R E
800724007:3 50-250 R
UHR 10, R E
B0070B0330 50-333 H
UHRIO.R E
B007330543 50-H50 R
UHR 10. R C
8007100126 50-250 0
UHfllO, R E
BOO? 070 100* 50-335 Q
UHSIB.fi E.
S007 160910* 50-335 Q
UHR US, R E
8007220069* 50-335 Q
UHRTQ-, R E
B00702039A PR
UHR 1-0, B E
8007160599 50-369 3
UHRJ&, R E
9007100021 50-333 Q
UHR 10, R E
B007100025 50-250 Q
UHR 10, R E
B00724OP6-3* 50-250 Q
UHR I G, R E
BOOV030221 50-335 P
UHR 10, R E
BOOV11O199 50-250 P
UHR re, n E
80073IOB20* 50-389 Q
UHFUG.R E
80070B014O 50-250 P
UNRIG, ft E
8007230181 PR
UHR 1 0, R E
BOOJMOaet 50-335 P
UHR 1 0, R E
8007110361 50-250 P
UHR I Os, R E
SO 07310064 50-230 0
UHRIO,R E
B00711OP56 50-230 P
UHR 10, R E
B0072IO040 50-309 0
UHR 10, R E
8007350312 30-338 0
UHRIO.R E
80071 60375 50-25O O
UHR 1C. R E
6007250872 30-33S Q
UKRIlJifl E
6007230582 50-250 G
UHR I &, R E
8007300538 50-230 0
UHR 1 0, R E
800731 OOfl 4 50-230 Q
UHR I G. R E
8007220374 30-333 P
UHR 10, R. E
80 072203 BO 50-350 P
UH»IO, R F
BO 072303 79 50-335 Q
UHRr<3. R E
8007230442 50-230 F
UHFUO. R E
BO 072304 3 4 50-25O F
(JHRIG.fi £
600728O531 90-25P P
UHR 10, R C
8Q0728056S 30-250 P
AUTHOR
ACCE63ION SUBJECT
NUMBER CATEGORY
UHFUO.R E
8007SB0647 50-335 F
UHFlf U, R E
8007-390634 50-333 F
ULLRICH, U T
6007310403 BO-SI77 B
ULLRICH, a T
G0073B0649 50-277 B
WPftrOHT, C H
8007150511* SO-302 Q
SJPRIOHT, C H
80072200BB* 50-339 0
UPRIOHT, C K
B007160B30* 50-335 0
WPRIGHT, C M
B007100061* 50-339 0
UPR1QHT, C 11
B0071B0011* 50-327 0
UPRIGHT, C H
8007I704291* 50-324 Q
UPRIGHT. C H
8007360425* SO-S70 0
UPTDNrR T
6007390253* 50-312 H
UTLEV.E E
8007S10273 PHM
UTLEVrE E
60070104 It 50-325 P
UTLEV-E E
B0070 10423 50-324 0
UTLEV.E E
B0070103O7 90-2*1 F
UTLEV-E E
60070I03E4 50-324 F
UH-EV. E E
9007010342 50-324 F
UTLEY.E E
00070103B4 50-2A1 P
UTLEV, E E
B0070I0423 50-324 P
UTLEY.E E
90070105U 50-861 F
UTLEY. E E
900724015.1 Pfl
UTLEY.E E
8007 150636 90-261 P
UTLEY.E E
80O7210415 90-324 P
UTLEY.E E
8007350420 90-361 P
UTLEY. E E
80073B0679 50-361 p
UTLEY. E, E
8007390690 30-261 P
VTLEY. E, E
8007390486 50-2AI P
t/TLEY. E E
8007370 73 3 90-324 P
VALENTIME, P C
8007310466 90-275 0
VALDRE. C J
8007110112 50-272 0
VALORE, C J
00071101 13 90-S72 0
VAN ORUNT, E E
8007380063 50-528 Q
VAN BRUNT. E E
8007S903S7 90-52B Q
VAN BRUNT. E E
B007300516 90-82S Q
VAN BRUNT, £ E
B0070207i!-9 Pfi
VrtW BflUHT, E E
B007100077 PRM
VAN BRUNT. E E
6007290533 30-820 Q
VrtM BRUNT, E E
6007210546* 50-520 Q
VAN BRUNT, E E
B007020531 50-S28 S
VAN BRUNT, E E
6007020533 50-528 9
VAN BHUHT. E E
80070B02H7 30-828 A
VAN BHUNT, E E
6007300132 NUREO
VrtM BHt/NT, C E
B007300530 30-820 Q
VAN DRUNT. E C
8007090233 90-520 A
VAN BRWT, E E
8007150039 Pfi
VAM BRUNT, E E
6007110398 30-3EB A
VflM DfiWT. E £
8007140307 30-829 S
VAN BRUNT, E E
8007140339 90-5SB S
VAN BRl/NT, E E
8007390916 50-32:8 Q
VAM BRUNT, E E
8007160346 50-530 8
VrtM BRUNT. £ E
00071606-32 90-92B 3
VAN BRUNT, E E
6007170470 SO-32B 8
VAW BRWT, £ £
B007310456 PR
VAN BRUNT, E E
0007290722 50-Sa0 8
VAN BRUNT, E E
9007H90773 30-528 8
VAN BRUNT, E E
BOQ72805BS 50-928 K
VAN HE POLL.ff
80073101 79» QA997
VAN NESS, S C
8007100I7BI" 30-272 0
VAN PAASSEN. H L
6007170610 NURGO
VAN ROOVEN, D
B007220033 RES
VAN RODYEN. I)
8007100233 RES
VAH WfNK(_e,W,
8007210473 30-247 P
VAHDENBURGH, D
8007140701 NUREO
VANDEN3URQH: D
S0071BOO97 30-27 Q
WMDE«3UROHi D
8007010403 PR
VANQEN3URQH, D
8007170116 30-29 Q
VANDENOURG. D
WNOEWffUROH, D
8007170331 30-309 Q
B007070407 PR
VANDEL, T E
BOQ7170635* 30-327 Q
VANDEW&UROH, D
B007310464 PR
VANDENBUKGH, D
B007280439 90-29 P
VAHDCOKH, P K
9007310235* SO-3EJ9 Q
VANBDORN. P K
VAN8KKEL. J
8007310245* 30-416 Q
9007230371* 50-331 R
VARANINI.E E
8007030104 PR
WRrtNIMf, E E
6007260044 PR
VARDEL, T E
fl007t500S3# 30-493 Q
VAROA.S A
B007020139 H1BC
WRW.fi A
B007020I39 50-3B9 A
VrtftQri.S A
6007020109 50-247 P
yftfiort.a A
8007020337* 30-847 P
VARGrt.a A
8007020330 30-261 F
VAf!GA.3 A
0007210314* 50-250 P
VAROrt.S A
8007100180 50-2il P
AUTHOR
ACCESSION SUBJECT
NUMBER CATEGORY
VAROA, 3 A
8007100136* 30-261 P
VARQA. S A
0007100165* 50-261 P
VAROA. S A
8007210311 30-250 P
VARQA. S A
00073 103B3* 50-250 P
VAROA. 8 A
9007010192 50-247 P
VARQA, 8 A
9007100103 50-306 p
VARQA, S A
0007100106* SO-2B6 P
VARQA, 6 A
900710O1 U* 50-286 P
VAROA, S A
BOQ717O4S3 5D-3I6 P
VARO^B A
8007170427* 50-316 P
VAROA, S A
B00717O434* 50-316 P
VAROA, 8 A
8007170245 90-247 F
VAROA, 9 A
0007170447 50-247 P
VAUQA, S A
8007190m 90-334 P
VAROA. 9 A
9007210037 30-291 P
VARQA. 9 A
9007I6080B 30-250 H
VARQA, B A
9007190044 SO-S06 P
VAROA. S A
8007100046* 30-296 P
VARQA, S A
90071BOQS3* 50-286 P
VAROA, S A
8007310053 80-286 P
VARQA, 9 A
90072100S9 50-247 P
VAfiQA. S A
00073 1O078 50-247 F
VARQA. 3 A
S007300029 90-348 P
VAHON. C
800715O749 FDIA
VERRELLI.D 11
8007140641 30-277 P
VERRELLI.D
8007090389 30-321 P
VERRECCHIA, P
8007200274 F01A
VERfiELU.D M
8007100487* 90-321 P
V1LLALVA, I
000702O095* TQPHEP
VILlJFORTH, J C
9007140640 PR
V1LLFORTH, J C
B00715O084 PR
visa IMS, 5 s
B007230073 90-313 F
VQEOEL1-R J
800729O04O 30-313 p
VOOEDINO. E I,
8007180652* TOPREP
VOQT -LOWELL, H
9007240281* 30-230 Q
VOIQHT, A F
8007240137 71-5080
VOIOTiH H
B007140370 BO-49B 0
VOIOT.H H
8007140370* 90-432 0
VOIOT.H H
800714037B* 50-432 0
VQLOENATJ.E
B00702O69B HISC
VQLLEN.n J
0007000035 30-367 0
VOLLEN, R J.
800708O03S 50-367 0
VOLLMER.R.H
8007020737 FINANCIAL
VOLLMER.R H
80O730 0030 F I NANC I AL
VDN ZELLEN, D H
8007220589 50-10 D
VONKEfiRMANK, J
800728 050B NUREO
VONHERfiMANN, J
B007230203 NUBEO
VOROERBflUEOQEN
VORDERBnUEOOEtJ
8007170270* 90-928 0
8007310516* SO-328 0
VQRBE.J Y
B007J 00095* SO-2A1 0
URAN«EN, J V
8007 140439* PR
WAQMAN, N A
SOO7170311 NUREO
WAGNER, P C
BOOS 190062 30-385 P
MAONER, A 0
8007100124* 30-416 Q
W ACHES! , B
0007110144 30-302 H
WAOMEfi.P.C
8007020067 50-285 P
WAGNER, P C
9007170698 50-208 P
WAONER. T E
0007I40B75 50-346 M
WALBRIDGE. W C
8007290370 50-312 Q
WftLDRIDOE.W C
BOO7310477 80-312 0
WALHRIDGE. W C
8007240123 50-312 P
WALBRIDQE.W C
0007230348* 50-312 P
WALKER, R, D
BOO71 70103* 50-373 Q
WALKER, F M
0007220360* 30-327 Ft
WALL.L B
9007210141 40-9745
WALLIS.O B
9007300399 TDPREP
WALSH, B G
B007070060* CONTRACT
WALSKE, C
8007310448* PR
WALBKE, C
8007230791* COMMISSION
HALSHE. C
8007140047 PRM
HftLBKE, C
B007310441 PR
WALSKE. C
8007280016 PR
WALTERS,!) K
8007070169* 30-389 Q
WALTER/ J F
8007160497 NUREO
WAMBACK.T V
8007110126 90-285 P
WAM0ACH, J L
8007290100 flES
HAMBACH, T V
BOO72S0114 90-285 P
UANDKE, N E
B0072203B7 30-304 S
MANDKE, N E
80070104B4 30-298 8
WANDKE, N E
B007010493 30-299 8
MANDKE, N E
B007 160668 50-304 S
WANO, T
80O7080ai9 40-299
HANQ, C K
80071 505S9 50-JOi H
MANS. C H
8007150649 90-243 P
WARD, D
800/220073* 40-8771
PERSONAL AUTHOR INDEX
457
AUTHOR
ACCESSION
NUHBER
SUBJECT
CATECORV
HAflD, K D
B007330333*
30-346
a
UAR D, D
0007220048
40-B771
WAflD.K D
B007230273"
SO-373
a
HAflD. E C
B00703017B
30-282
R
WAflEMBOURO, D
80070B02S4
50-267
B
UAREMBQURO, D
S0070B0269
50-267
B
UAflEMBQURO. D
S0070B0422
50-267
B
WAflEMBOURQ. D
S00701O344
50-267
R
WAflEMHOURO, D
8007010496
50-367
S
IMKEMBOURG, D
B0070S0210
30-267
S
WAflEHBOURO- D
B0070802B9
30-367
9
WAHEHDOURO, D
B0070B0406
50-267
R
UAflEHBOUfiO, D
B007f00173
50-267
B
WAflEMBOURO, D
8007230S43
50-267
3
UAREMBOURQ, D
8007230543
30-267
B
UAREMBOURO, D
B007230534
90-267
B
WAR I NO, J P
8007010244*
FOIA
UARMICK^R F
H007140494"
30-263
Q
WARNtCK'R F
B00723032B*
50-305
Q
HARNICK. R F
S007300309*
50-263
Q
HA3SERHACH, A E
8007030209»
PR
WAB8ERBACH,A E
B007IS0230*
30-320
H
WASaERBACH.A E
BOO7 160779
PR
WAS9ERHACH, A E
800701 0508
30-320
H
UA&SERBACH. A E
8007030204
Pfl
WATFORD. H
60071 50633«
50-261
R
WATKfNB, D
B007070049*
30-314
D
HATSQM, J H
B007150013
30-437
H
HEAVEft, C L
B007070264
30-10
D
HEAVER, J
B007210390
50-397
U
HEAVER, J
8007300367
30-397
U
WEBB, H
S0072B09SS
90-272
0
WEBB<R E
8007300333
50-272
O
WEBER, D A
9007230196
30-313
P
WEBSTER. E H
8007230362
50-280
B
UEEHS, E. D
800715056B
50-133
R
UEONER.M 8
8007100135
REOOD
UEGBT. W
6007160240
50-142
F
WEIOAND. J 0
8007B1014B*
50-438
Q
WEIL, C H
80072B043B*
30-346
a
WEINER.R E
B0071 -V0190»
50-347
p
WEINEH.R E
8007170390
SO-344
p
WEI6Ef1ANN,R A
S00722O496*
TOPREP
WEISS, A J
B007310216
NUREO
WEISS, A J
8007310471
NUREfi
WEISS, J. D
B00701010A*
71-5760
WE I BB, E R
8007240044*
C OHM I SB I ON
WEISS, D
B007010252
70-734
WEISS, D
8007100462*
71-9094
yEISfl, E R
8007 130332
70-143
weisa,E R
B0070B0043
SO-2B9
0
ME IBS, B H
8007160143
50-320
H
UEISS'O H
3007160155
50-320
H
Wel63,B H
8007160(60
50-320
H
HEISa,B H
B007160167
50-320
H
UEI6S.B H
B007160170
50-320
H
HEIGB.B H
800716O1B3
50-320
H
WE IBS -D
B007280090
70-371
WE IBS, E R
B0071 40023*
SO-289
0
WEI88.E R
B00714001B
50-289
a
HE:SS,E R
B0071400S2*
50-289
0
IJEJBflf E R
B007300039
PR
HEJSS, E R
B007300043
PR
WEJSB,E R
B0072S0043
FDIA
WEJS9, D
8007180372
70-133
HEISS, D
8007210106
70-820
HE 186 1 D,
B007250363
70-371
WEISS, 0
8007SB0027
70-734
HEIS8.J D
S00721009B
70-33
WEI5B.E R,
800723022?
FOIA
WEISS, £ R
B007210495*
30-289
a
WEISS, £ R
8007210497
50-289
&
MEISS.C R
B00721O493*
50-289
a
HEIB3, D
8007230731
40-B6Q1
viEiea, Q
8007290044
70-1237
WEIBS.O
B007230049
70-8
HEIBS.D
BOO 78301 61
70-734
WEIBS.D
80072B004S
70-2623
WEIBB.D
8007390101
70-487
UEIBS.B H
90072 40133
80-289
s
WEfSB, E R
8007290701
ORO
WEISS. E R
S0072907B1
OHO
WEISI. 0
8007100094
PR
WELLER.R A
8007170399*
50-320
Q
UENSLAUAKI.F A
BQ07130130*
50-344
a
AUTHOR
ACCESS I Q(J
NUHDEH
SUBJECT
CATEGOBV
UENSLAWSKI.F ft
B007180025*
50-906
Q
WENSLAUSKI.F A
6007230339*
50-224
Q
MENSLAUSKI.F
B007030021
50-206
S
WEMSLAUSKI.F A
8007310168*
50-28P
a
MERLIMB, J A
BOO 70 10396
SO-334
S
WERLINO, J A
BOO 70 10400*
50-334
S
WERLIMO, J A
80070 104 56*
50-334
S
WERLIMO, J A
SD07010536
50-334
S
WERLINS, J A
8007010536*
50-334
B
WERLINO, J A
0007070296
50-334
S
MERLINS. J A
6007090334
90-334
S
WERLIMQ, J A
B007090340
90-334
3
WERLIW8, J A
60071B0317
90-334
8
WEflLUIO, J A
B007220fl30
50-334
S
WERLUIQ, J A
6007230315
90-334
8
WERLINO, J A
B0073003&3
50-334
S
WERNER, J
B0071HJ416*
50-346
a
WERNER , H J
a007Ea05B9*
90-346
s
WESCDTT, H H
a007110168»
30-461
a
WE8CDTT, H H
S007160764»
50-461
a
WESCOTT. H M
90 07300157-
50-483
a
WEST, J T
80 07 110493*
SO-3HO
p
WESTERMAN, T F
8Q042402BI
50-267
9
WE8TERMAN, T F
B00715017U
90-385
Q
WESTERHAN, T F
BO 07230 197*
50-313
a
WESTERMAN, T F
BOO71S009U
SO-267
a
HESTERMftN.T F
600715013f>«
SO-298
Q
WEBTERMAN.T F
B0073003S4*
50-313
a
WESTFALL.R H
B00.7110493*
50-320
p
WETTERHftHN.i1, J
B007020407
PR
WETTERHAHN.H J
8007150509
50-272
0
WETTEftHAHN,(f J
B0071SOS09
50-272
&
WHARTON, R J
a007140034»
30-361
a
WHARTOM, R J
8007140034*
50-361
&
WHATLEV. H E
8007iB047B»
50-320
H
WHEATLeV-P B
B0072B0196
RE8
WHEELEfi , H
8007160403
PR
WHEELER. R V
B007140S9?
PR
HHIPPLE, 0 H,
80-0'70a0337*
PR
WHITE. J 0
B007160S69*
30-454
K
WHITESIOE8.0 E
8007110493*
50-3HO
P
WHITE, T
BOQ7220I54*
50-462
0
WHITE, 0 fi
B007100014*
so-sao
0
WHITE-SELL, D £
B007D10051*
QA999
WHITESELL.D E
80071604IU
QA999
HHITESELL, D E
9007100339*
QA999
HHITESELL, D E
8007210373*
QA999
WHITE, L D
S00723000B"
50-244
Q
WHITEEELL, D E
8007210264*
OA999
WHITE.M
8007210029
ACRS
HHITESELL, D E
9007230155*
QA999
WHITE. L 0
B00702001S
SO-244
a
HHITE.W H
6007100062*
50-344
0
WHITE, H H
6007100062*
SO-344
0
WHITE, L D
B0071B0141
50-244
Q
WHITE, L D
B00724OI45
PR
WHITENEfi.H L
S007BB0425*
50-270
0
WHITE. L D
8007070342
50-244
F
WHITE, L D
B0070B0272
50-244
P
WHITE. E B
8007100257*
PR
WHITE, L D
800725049B
50-244
Q
WHITE, t D
6007220403
50-244
P
WHITE, L D
B007290740
50-244
P
WHITE, L, D
90072B0633
50-244
a
WHITE, L D
BOD73103SO
50-244
F
WHITE, L D
B0073 10378
50-244
F
WHITE, L D
9007310401
50-244
p
WHITMAN- 0 D
8007310554
NUREO
WHITNCY.O 0
8007080192*
50-393
s
WHITNEY. 0 0
6007 190704*
50-293
R
UICHERS.D L
6007010591
40-BS02
WICHER8, D L
8007030079
40-8302
WITHERS, D L
B0070303S9
40-B303
WICHERB.D L
9007070147
40-B302
WICHERS, D L
8007130631*
40-8302
WICHERS.D L
B007 150644
40-8502
WICHERB-D L
80O721O549*
40-9502
WICHERS, D L
B007210542
40-3502
WICHERB, D L
B007210I01
40-8502
UIUU£R<W A
B007I10HS9*
50-321
0
WIDNEFi.H A
8007240264*
30-321
a
WIBNER.W A
8007090074
30-321
a
WJ1JHER.W h
90O7O1O474
50.-321
P
WIBMER.H A
8007260120*
50-321
Q
W1DNER.W A
80070B02B7
50-321
P
AUTHOR
ACCESSION
NUMB EH
SUBJECT
CATEQQRV
WIDINER, W A
WIDNEFl, W A
HIDNEft, W A
WIDNEft, W A
W1DNER, W A
6007220.281
00070B0323
6007090339
BOQ7I 40357
8007140384
50-321 3
50-331 P
30-321 Q
NUHEQ
50-321 Q
HI ONER, IJ A
WIDNER, W A
UIDNER, U A
WIENER, U A
UtDNER, U A
8007250393
6007310273
60073 IQ3B7*
B007220422
0007280634
50-321 Q
90-321 Q
50-331 Q
50-321 a
30-321 P
MEDNEfl. W A
WIDNEfl, IV A
UIDNER, W A
WIDNER, W A
WIDDFF,M P
80 07380 541
900729O6I8
9007260536
8007200514
B007 140003
50-321 &
50-321 Q
50-321 0
50-331 F
90-239 Q
HI DOFF, H P
WIDOFF, H P
WIDOFF, H P
WIESEMANN. fl A
WIESEHANtl. R A
BO 071 40003
6007390779
B007290779
BQ071B0357
BO 072204 B8»
50- BS? 0
30-28? 0
50-289 0
30-244 P
TdPREP
WIQCIHTON. D
wiooiiiroN-D
W1S8IN, E A
HI OS INS, E J
WIGGINS, E
7904030 1B6
79041OO1S6
3007110031
9007100361
B007I70137
50-334 P
50-334 C
PR
CONTRACT
CONTRACT
UILHORN.L
WILDOURN, Q R
WILCOX* j D
WILD, A ft
WILD, P A
8007230297*
6007150166*
B00716Q872*
9007020655
3007140583
50-313 0
50-327 S
50-414 Q
50-320 H
50-339 S
WILD.P A
WILLIS.C A
WILLIAMS.R E
WILLIAMS C C
WILLIAMS, C C
80071-50601
9007160798
8007010363*
6007 1501 IS"
8007160479*
50-339 S
REGOD
40-1162
50-454 Q
50-546 Q
WILLIAMS, C C
WILLIAMS, C C
WltLIAM8,C C
WKLIAWS.C E
WILLIAMS, J E
8007330019*
6007230700*
BOO 7 2307 10*
600729031 5
B007250117*
50-456 Q
50-373 Q
50-946 Q
71-901O
COHHI6BION
WILLIS, E
WILLIAMS, F C
WILLSE-r, U 8
WILSON, B D
WILSGN. H E
80071 10406*
8007300369
90073101 11
S00731O270*
9007110231*
50-324 R
PR
50-277 R
FOJA
PR
WILSOtJ. U E
WILSON. U E
WILSON. B A
WILSON, D D
WILSON, F K
6007110239*
6007110223
BoQ70aoai i
a00714QS46»
90Q717O317*
PR
PR
TOPflEP
SECY
90-483 A
WILSON, J II
WILSON, B 0
WILSON, B 0
WILSON, J M
WILSaiJ, J tl
3007020131
3007230131
3007330107
3007030239
3007010297
PR
XPORTLIC
XPDRTLIC
50-322 A
50-322 A
WILSON, 0 C
WILSON, J U
WILSON, J U
WILSON, J U
WILSON, J L
3007030051
90070 1O340
30070 1O394»
9007010129
30070 1O442*
SO- 329 0
50-291 S
50-291 9
50-290 B
9Q-2BO S
WILSON, J H
WILSON, J U
WILSON, J U
WILSON, J L
WILSON, J U
3007 1 40519
3Q070703S9
800707O397*
3007070224
90O7O7O229*
50-322 T
50-2BO S
50-2BO S
5O-2BO S
50-260 B
WILSON, R P
WILSGN, J H
WILSON, J N
WILEGW, J M
WILSON, H 0
8007110097
3007 1 70339
BOQ717O317*
30071 7035 1»
8007310042
PR
30-322 A
S 0-322 A
50-322 A
XPORTL1C
WILSON, B D
WILSON, J i,
WILSDlf, J U
WILSON. J N
WILSON, J U
9007310044
B007 140249
80071 40259*
8007240466
B007190319
XPOHTL1C
50-200 3
SO-9BO S
30-3S2 A
50-291 S
WILSON, J U
WILSON, D [>
WILSON, J H
WILSON, J U
WILSON, J U
B007 130327*
80073 1 Q066
8007230133
3007230607
8007330610*
50-281 S
XPORTLIC
50-322 A
50-290 S
50-230 S
WILSON, J L
WINAN3, L r
WINTERS. C E
WI THROW, 0 C
WDFFORD, A W
8007230425
3007100017
80072 4O258
8007190664
3007160867*
50-290 S
Pit
70-10A2
50-153 fl
5O-322 0
58
PERSONAL AUTHOR INDEX
AUTHOR
ACCESSION
flUMDER
SUDJECT
CATEQOIT
V
DHLSEM, U t>
0007080385*
rDPREP
OLF, J F
0007020623
90-320
O
DLF, J F
H007080002
30-320
0
1LF, J F
80071-10006
50-32O
T
QLF, J F
8007220006
30-320
&
DLF, S J
B0072'J0746
50-466
0
DLF£ , S J
SO 07020436
50-466
0
OLFE.S J
BO 070300 6t
50-466
<3
OLFC , S J
6007220004
50-466
0
OLfE. S J
6007330703
30-466
0
QLFE , B J
BO 073003 56
50-145
M
]L:VEH, j
B007220565
50-393
0
JLIVEH, J
B007330S63
90-399
0
3LTNER. E
BOO 7230 1M»
70-371
1HO, r
B007170571
40-299
3NO, T
8007140371
40-299
BQS. E C
800701 033 9
50-309
S
30D, E, C
80070B0413
30-309
S
mo. E c
B0072E01Pa
50-30 9
B
aODHEAD, C P
B007 100043
30-341
Q
JODHCAD.C P
6007300429
SO-40?
0
atlDHVFF.n U
0007300560*
50-321
Q
DODB. ft
BOO 4 2402 10
14.E
DODS, r G
0007140440
PRM
MLEVEfl.E J
H007IB0095
50-412
a
1QLEVER.E J
8007010343
30-412
a
3DLEVEF1.E -J
B007aiQ016
flO-412
Q
1AV. J R
B0072301M*
3Q-23t
0
1AV.J R
0007230112
30-2H9
0
ICHT. Q L
Q007 140258
XPDRTLIC
UGHT.F B
3007030365
Fft
IEOHT, K H
8007020O 1 3
4O-449S
HOHT.O C
8007140493*
SO-15B
0
HQHT.K H
Q007 100034
4O-4492
IIQHT.K M
B007 1 00087
40-44VS
'IQHT.O C
B007230303*
SO-331
Q
UQHT, R U
Q0072703&H
9Q.-43Q
a
UGHT.B L
0007150030
XPQRTLIC
IOHT- B U
3007 1 50034
XPOHTLIC
MQHT, n L
300715003-?
XPOKTLIC
IOHT. Jl L
B0071iOB24
XPORTLIC
1IOHT. B L.
3007310311
KPORTL1C
>.a
3007330620
40-H7i27
l, K
9007170362*
XPQRTLIC
JLLER. G E
9007030215
90-46(
a
ILLER.O E
a0071A06Sft
50-461
B
HTKE, 0
8007020346
XPORTLIC
MANA. K
8007260164
XPORTL1C
.NDELL. L A
aoo7aoo3ai-'
50-313
a
HN, A D
8007130133
PR
AUTHOR
ACCESSION
NUMBER
SUBJECT
CATEODR1
i
YIN, 1 T
Q0072300B7!t
50-38 B
Q
VIM, I T
BOP723073B»
50-3"? 5
0
VIM. 1 T
B00731031i»
90-26&
0
YODEH,R C
B0073000I4
p-a
VOfiE.J R
B007070030»
90-514
D
VOUNOBLOOD, B J
B007 150047
50-HSO
\\
VOUNOrM F
B007290152
NUREC
YOUNG. T
B0072403-!5't
50-275
O
YOUNOBLCQD, D J
B007010571
SO-369
A
VOUMOBLOOD, B J
a0070206H8
50-2B1
H
YOUHOBUDDB.fl J
3007070203
50-339
P
YOUHOBLOOdB J
8007090373
50-3B7
A
YOUTOBLOOO, D J
a0071H0339
50-3B7
G
YOUMQBLGOD, H J
8007110137
50~4fi2
F
YOUNOHLOCD. B J
30071 10J94
50-483
F
YDUHSDLOQQ, B -J
30071 1O583
50-369
A
YOUM3BLODD, B J
aoo7iaoi4o
5O-3B7
Q
YOUNOBLCBD,0 J
3007170605
50-369
A
YDl/NOaLOOB. B J
aoo7iaoo39
50-339
P
YOl/MO, T
a007310327»
50-275
Q
VOl/MOBLODB. D J
a007170449it
50-339
P
YDl/HQDAHL, Ft C
8007140392
50-3
P
YCI/JJOBLODO. H J
3007190042
50-443
A
VUUHOBLOOQ.D J
3007 1 800A9
50-369
A
VOUMOBLDaa. D J
aoo7iao5Bo
50-4 HJ
A
vauNOULOOD. a j
8007^30127
50-3A9
A
VOUNOBLDOD, B J
80072308-17
S-0-4B2
11
VOUMOBLOOD. B -J
8007a3O55a«
50-182
M
VOUHOBUDDO, B J
Q0072B0013
30-4B2
M
YOUKOBLOOD,B J
B007390O19
30-4B2
M
YDUW3PLODO, B J
8007230622
80-443
H
YDUN-aOUODD, B J
9007230 16.fr
30-369
A
VOUNOPLODDiB J
9007390004
80-3B9
M
VflUWOBLOOD, B J
3007290019
30-307
A
VdUNOBLOOO. B J
3007250181
80-369
A
WAN, 0
3007070084
PR
VUHAS-0 P
3007 10D014»
50-320
a
YUHAS, 0 P
9007190023*
SO-SOB
a
YUHA8. 0 P
a0072303BS»
30-224
a
YUNDTrC P
8007090413
50-344
B
VUNOT.C P
9007140312
50-344
R
YUNDT, C P
80071 S05H1
90-344
B
VUNOT.C P
8007 1 50B2O
50-344
S
YUNDT, C P
8007230648
50-344
B
YUN&r. C P
B0072BQ545
50-344
S
VUNDT, C P
9007380863
50-344
B
ZAW.E3, R, E
B007OZ0633
50-889
0
IAlfl-E(l, R E
B007O20633
50-28?
0
ZAHiER.R E,
Q00714O224
50-289
0
lAHtEd, R C
B007140224
50-2B9
0
ZAHLER.R E
80071B0391
30-289
0
ZAULEH.R E
BOO71B0421
50-289
0
ZAHLER.R E
B0071B0391
50-289
0
ZAHLEH.fi E
BO 07 100421
50-289
0
IAHLER. R E
BO 07230306
50-2B9
0
HAULER, R E
BO 072305 14»
50-2B9
0
ZAHLER, R E
8007230610
30-289
0
IAHLER. R E
BO 072305 14*
50-289
0
IAHLER.fi E
8007230610
50-2B9
0
ZAHLER. ft E
80-07290533
50-346
H
ZAHLER, R E
B007290533
30-346
M
ZAJACiL D
600731 024 9»
90-416
Q
£AftAKA8, P
8007230044
PR
IARAKAB, P
B007090279
90-3
P
ZARAKAS, P
8007110396
30-247
S
2 AfiAKAS, P
8007140375
NUREO
lAFJAKAS, P
8007220476
90-247
R
ZARAKAS, P
8007220504
30-247
P
TARAKABi P
8007220923
90-3
R
IARAKAS, P
800723047 1
30-247
P
1ARAKAS, P
B0072401S7
30-3
1
ZARAKABi P
8007240169
90-247
&
ZARAKAS, P
B0072906B2
30-3
H
ZARHA8, P
8007220454
90-247
P
ZECH. 0 0
B007100149
ACRB
IEFF. D W
9007100397*
70-1201
ZELAC.R E
8007100007
PR
ZELLHER.R J
8007280270
FOIA
ZENTNER.M A
8007210331*
CONTRACT
ZENTNER.I1 A
8007140203*
CONTRACT
lOLICIYNBKIr J B
8007210312*
90-39
R
ZIDULSKY.H
8007250494*
70-820
Z IHMERMAN, R P
8005230131
90-249
8
ZIMMERMAN. R P
B0073I0363*
30-243
a
ZITTEL.H, E,
8007140903
REB
ZITTEL. H E
B00717064B
RES
ZULLA.8 B
80072303 17»
50-2B6
a
ZUi-LA.S 3
aoo7oio4sa
30-286
B
ZULLA.S, B
B0070I044B
90-2B6
8
ZULLA.S S
8007030330
30-286
B
ZULLA.B B
B0070B0355
50-2B6
B
ZULLA, 3
8007140333
30-894
B
ZULLA, B S,
8007210466
90-286
a
ZULLA.B S,
8007290052
50-286
s
ZULLA, S 3
8007210376
30-286
R
ZULLA, B S
8007210418
90-286
a
ZULLA, S 8
8007310426
30-286
s
ZUMBRUN, R A
8007100237*
PR
ZUMBRUN, R A
80071O02S7*
PR
ZURAKOWBHI.P R.
8007140670*
40-2940
ZWETZIO, 0 B
80072.20337*
30T73
Q
ZWETZIO, 0 B
8007310301*
30-312
a
The subject category column in this index gives the docket
number and the symbol for the category of Information
within that docket; for example, 50-320 P. The docket subject
categories are defined In Appendix A.
Subject categories for nondocketed items are also entered
In this column by symbol; for example, ACRS. These cate-
gories are defined En Appendix B and listed in the Contents.
An asterisk following the accession number In this index
indicates that the document is an enclosure to another
document. To obtain the accession number of the principal
document under which the enclosuro Is listed, refer to the
index entitled "Cross Reference of Enclosures to Principal
Documents."
AUTHOR
ArFILlATIOH
ACCESSION
NUMBER
SUBJECT
CATEGORY
3M Co , Hinntiot* Mining 8: Mfg Co
G007020419
MI9C
flOIP USA, Int
60073 105EO
XPOHTLIC
Accuracy In Media
B007280294
FOIA
Advanced Technology. Inc
9007090377
FOIA
8007140240
FOIA
Advitoro Council on Historic Preservation
80072101 41
8007170413
40-B745
NUREO
Agricul turti Dtp t of
8007280333
40-Q745
Agrlcul turei D»p t of. Foreit Service
8Q07S90621
50-10
D
Air Forc»j Dep t of
S007020444
PR
B0071S0077
PR
Air Product* It Chemicalii Inc
8007880333
XPORTLIC
Al>b*iri Power Co
Q00701O406
50-34H
S
aoo7oio4ia*
50-310
3
80070 10«4
50-364
A
8007010444
5O-34S
S
8007010446*
50-34B
3
B00701&4B9
50-364
A
8007070149
80-318
R
800707O176*
SO-348
R
8007070 1BO«
5O-348
R
B00707O190*
50-3Hfl
R
800707O194«
80-348
R
8007070199*
S0-34fl
R
S00707O204*
SO-34B
R
S00707O208*
30-34B
R
80070702 1 4*
SO-346
R
B00707O217*
90-346
R
B007070219*
SG-348
R
8007070223*
50-348
R
8007070226+
30-34B
R
B00707022B*
30-346
R
8007070230 *
30-348
R
9007070232*
50-348
R
8007070892
50-364
A
90070B0222
SO-3&4
A
80070BO229«
50-364
A
8007090232 «
BO-364
A
90070BO236-*
50-364
A
80070BO243*
HO-364
A
S0070Q0230*
30-364
A
800709O214
NUREO
S00709O237
SO-364
A
S007100177
50-364
A
80071001B5
BO-364
A
600V 100261
3O-348
K
B007 100261
SO-3^3
K
B007 100267*
SO- 343
K
8007100267*
90-348
K
B007 100276*
30-34S
K
9007100276*
30-318
K
8007110502
PRM
8007140343
5-0-364
A
8007150662
90-346
R
800715O66B*
3.0-34 B
R
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEttDRY
BQ0715Q7I4
B007 16054?
B007160379
BQQ7160S&1
BQ07210H65
30-34a P
50-348 fl
50-364 A
SO-34B S
90-34D 0
BOQ7210479
BOO 72201 1 O
BOO 72204 96
BOQ72S0510
BOQ7220310
30-349 P
50-364 A
50-364 A
50-348 P
SO-34S P
3007220513*
BOQ7220354
BQ07220S54.
B00722035B
B007220559
50-34B P
50-349 P
SO-34B P
50-34B P
50-34B P
B007220SB1
B007230403
B007230403
BOO 72304 03
B007230493
90-364 A
50-349 P
50-343 P
50-344 A
50-364 A
8007230510
0007330546
3007330353
H0072303S3
HO 072303 67
30-364 fl
90-364 A
50-3 4B P
30-348 P
30-364 h
S007230S92
SO 0-72400 71
BO 072503 20
S007250479
BO 072800-52
50-364 A
50-364 A
30-364 A
50-34E3 0
PR
E007280490
B0072GOS37
BO 07280 b HI
BO 07290637
BO 07290642
30-364 A
30-364 A
50-34B F
5O-364 A
50-3 6fl A
Atabamai State of
B00729QB59
B00731O15Q
BO 073 10330
B0073 10374*
B007190O22"
50-3 4B Q
30-3 6 A 0
50-364 0
50-364 0
State Prog
Alaska, State of
AliJrich Chemical Co , Inc Iiubi of
Sigma-Al Srlch Corp )
B007010133*
3007010577
3007020014
SO 07030 063
H0071iO403
State Prog
XPOFtTLIC
XPOftTLIC
XPOHTLIC
XPORTLIC
Allan Spec tor (• A*<oc latei, Utd
Allied Quit rill Nuclear Services
Ai 1 Ij-Cha Inera Corp
BO072H03I7*
EC-071S0049
BO0731O139
EO07U0014
BO0711O016*
40-1162
NUREQ
50-332 Q
71-231
71-231
Atpha-Oneja Services. Inc
BQ072B0151
B0073B01550
BC-072SO 1 60*
BOQ73B0165*
71-3979
71- 5^71
71-5979
71-5979
459
60
CORPORATE SOURCE INDEX
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEOQF1Y
B007280|73»
71-5979
American EJectrii. Poiuer Co , I n,c
BQ07O20412
PR
American Institute For Res-earth in th»
80071B020B*
90-213 F
Behavl oral Sc lent es
ArriBriean Mine Services. Inc
9007170172*
CONTRACT
8007240170*
CONTRACT
3007240173*
CdNTRACT
/i merle an Nuclear Insurer*
B007I00134
PRH
0007210442
MISC
S0072B0059
PR
B0072B0067*
PR
rtmirtcai Nuclear Boeieti)
8007100294
PR
8007100257*
PH
B007140046*
PR
American Warming t Ventilating, Inc
B007240353
50-327 S
ftmer i ham Corp
B00729O932
71-370
B00729O934*
71-370
'Was Labors tori;, Energy & Mineral
B007240157
71-SOSB
fleto-ureci Res Institute
^nacprtd* Co , Anaconda Copper Co t>iv
8007110494
WASTE MST
8007110457*
HASTE MOT
^nKnor/Dar I ing Valve (tirbi Anchor/Bar 1 1
B0071O0330*
GA999
ng Industries!
^nder jon-GreenuooiJ t< Co
8007300319"
OA999
nof-coi Inc
S0072304830-
•S 0-337 P
mil-Nuclear Croup Represent In-j Yor *
B007H20203
90-2B9 Q
B00722O201?*
30-369 Q
B007220217*
90-289 0
iptech Engineering Services
6007280404*
50-206 B
.rgonn* National Laboratory
H0071 00363
NUflES
8007190031
NUREO
B0072 10027
ACR9
3007240459
NUREO
B00725001O*
CDMMrBSlC-N
irgonn* National Laboratory - Argonn*
B0072SOIB4
71-9132
.rlioni" Public Service CD
0007020525
50-520 S
8007020325
50-52B 9
BOO 7020 525
90-529 B
00 07020 329»
90-52B S
S007Q2O539"
30-529 S
9QU7Q2Q929-
30-S3B 8
8007020531
50-923 E
9007020533"
30-529 6
8007020733
PR
B0070B0227
50-S23 A
0007080327
30-520 A
8007080227
30-520 A
8007090365
30-533 A
8007100077
PflM
6007110393
30-52B A
B007 140207
S 0-528 S
0007 1 4O2O7
30-528 B
8007140217*
50-52B S
0007140217*
50-933 S
800714033?
50-523 S
8007140339
50 -538 S
6007140341*
50-529 B
80071 4O341*
50- 523 B
80071 •10448
PKM
SQQ7I500Q9
PR
G007160946
30-530 a
B007U09SH
90-330 S
6007160632
50-S2B 3
B007U0632
50-529 S
3007160652
90-523 9
8007160633*
50-329 S
B007U0658"
30-529 a
BOO 71 606 5Q"
90-528 E
BOO 7 I 704 70
50-saa B
30071 7O470
50-52 B S
300717O493*
50-328 B
6007 1 70493*
50-538 B
\
90-S2B 0
t
40-B77I
5O-S28 Q
BO-52B Q
30-323 K
50-5313 K
10-523 K
10-529 K
W-53B *
IO-S2B K
AUTHOR ACCESSION
AFFILIATION NUMBER
SUBJECT
CAT£OCR\
r
B0072BQ39B*
50-528
K
B0072803'?a*
30-52B
K
800729031 6
50-528
Q
SQ07290S16
50-529
Q
9007390523
90-52B
Q
8007290722
50-528
S
9007290732
30-5ZB
e
8007290773
50-528
3
3007300106
30-32B
Q
9007300106
50-520
e
SCO 7300 1O6
50-528
0
S007300152
NUREO
BQ07300S16
50-328
a
B007300330
50-52B
a
B00730Q530
BO-52B
a
B0Q7300530
50-923
a
8007310456
PR
Ariionj, fltato of B00702QQO9*
CONTRACT
Arieona, Univ of B00703013B
PR
0007140611
PR
8007130140
PR
Artanu* Power (. Light Co 6007010396
50-313
p
B007010369
30-313
F
B0070103BO*
50-313
F
8007010407
90-368
8
BQ07010414*
SO-36B
S
0007010436
30-368
5
8007010437
50-368
S
8007010440*
50-36B
a
600701 044 1#
50-36B
a
B0070 10470
50-313
R
8007010480*
30-313
R
0007010927
50-368
B
8007010933*
30-369
8
9O07020003
71-5957
B007020194
30-313
Q
B007020201
50-313
Q
B007020210
30-313
P
8007070149
30-313
F
BO07070I4B
50-313
F
B0070703S3
50-313
P
B007070233
30-313
P
BO07Q80066
90-36B
P
B0070S0144
SO-36B
S
BOQ70B0154*
50-36B
B
8007080 16O
30-369
8
8007080166*
90-36B
8
aoo7oaoi7i
5O-36fl
9
BOQ70B017B*
50-36B
S
B0070902B7
50-313
P
8007090323
50-369
5
SQ0709033&*
30-340
B
BO07100143
30-313
R
80071 00 14B
30-313
H
B00710Q14B
30-313
H
BD0710D3i>i
PRH
S007 1 40396
80-369
B
8O07 140403*
30-36B
8
B0071B0394
50-313
P
BO 07 150394
90-313
P
800715049.9
30-313
P
80071504B?
30-313
P
B007 150494*
50-313
P
B007 150494*
50-313
P
B007 150330
30-313
S
80071 30S3B*
SO-313
8
B0071 50995
30-313
S
B007 150603*
50-313
S
B007 150641
50-313
S
B0071 50447
90-368
B
S007 150650*
50-313
S
BOO71 50660*
50-36B
S
B0071 90603
50-36B
B
B007 150693*
30-368
S
BOO7 130694
90-368
8
800716034B
30-368
P
SOO7 170201
30-313
F
SOO7170205«
30-313
F
B007 180099
71-910B
8QQ7I80312
30-313
8
80071H031B*
30-313
B
8007180429
50-313
P
800.7180429
30-313
P
B0072 10331
50-368
R
9007210383*
30-36B
R
CORPORATE SOURCE INDEX
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEGORY
BOO72 10396
50-369 S
B007310400*
50-36S B
BOO7210406
50-313 B
80072104 13»
30-313 S
80O72 10420
30-313 R
B007210432*
30-313 R
B007210430
30-313 R
B007320495
50-313 0
Q00724012O
30-313 P
BOO7240148
3O-313 S
BOO7240150*
90-313 S
BOO7240176
90-313 S
8007280222
90-3&B P
6007390226*
5O-36B P
80072B0504
30-313 B
B0072B0511*
30-313 S
30072905 4&
30-313 3
BOO7aB0346
30-313 B
B0072B064i
50-3&B S
SOQ7290655*
SO-36B 8
BOO72?0403
90-31i3 P
3007300093
PR
BOO7300323*
90-313 Q
B007300323*
90-3k3 Q
80O73O0333*
BO-313 Q
8007300333*
30-313 0
Ark*nin. 8tit» of
B00703002-4
PR
Armitrong Cork Co
QOO707040&
BOO7300066
PR
PR
Development & Reidln*n Command
Armiji Dipt of
8QQ7020370
90-i7 R
9007020375*
30-67 R
BOO7020382*
30-67 fi
B00715008O
PR
Arrag.Dapt of, Office of Burgeon Oeninl
BOO70204&1
PR
Arnold V Porter
80O72S01SO
HASTE MOT
Anociation of Americin Oeagr«ph*n
B0071B02S7*
HISC
AtUt Miner*l«
BOO722O29 1
40-3493
Atomic Energy of Canadai Ltd
BOO 7240391
PT21
Atomic Induitrial Forum
BOO703O346
PR
BOO7( 00246
PH
B007I10031
PR
B00714O047
PRM
BOO 733 0731*
COMMISSION
G0072401390
NUREO
S0072B0016
PH
8007230032
PR
8007310441
PR
8007310443*
PR
Auitln, TX
800721 03BS
90-449 M
Automited CorreipondBdce Bg»tem». Inc
BOO717O2S2*
CONTRACT
BDM Corp
B00707006O*
CONTRACT
Bibcock (. Uilcoi Co
BOO701000A
70-B24
BQOJ7010Q1O*
70-824
BOO7010293
70-S24
B0070203St>*
70-824
B0070B0312
TOPREP
B00709019B
TQPREP
8007090201*
TQPREP
8007170417
TOPREP
8007170421*
TOPREP
80071B0486*
TOPREP
8007230239
00-320 S
8007240001
TOPREP
8007240002*
TDPHEP
8007300394
PRM
80O73104B9
XPORTLIC
8007310490*
XPORTLIC
Babcock t Wiltoi Co , Naval Nuclear FUB!
8007010553
71-9341
Dlv
SOO7020339
70-27
8007020353*
70-37
BDO7020365*
70-27
Dabcach & (Jilt on Co , Nuclear Material
B0070SOOOS*
70-135
Div
B0071O0397*
70-1H01
B007150135*
7O-364
0007150149*
7O-364
80O7130BO9
70-364
80071 SOB 14*
70-364
8007160377*
OA999
S00723021 I
71-9022
Badgii* Safe Energy Alliancci Inc
BOO7 150473
5O-4B4 0
Baker & Botts
B007020471
9O-466 0
B0070206O5
90-498 0
AUTHQH
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEGORY
9007000013
50-466
0
8007000017*
50-466
0
80070BQ05B
SO -466
0
B00709Q1B1?
50-466
0
B007 150425
SO-449
M
&Q071S0425
50-445
M
S 007 14 0553
50-490
0
S 007 14 0570
50-466
Q
S 007 14 0639
50-466
C
B007 160-645
90-466
0
SOD7 160433
30-466
G
3007350424
50-466
0
8007230441
30-445
N
8007300090
50-49B
C
8007300402
SO- 4 66
C
8007300406
50-490
Q
6007300413
SO- 4 it
•G
6007300417
30-490
0
6007300335
30-466
0
6007300*49
50-466
0
B0073 10094
50-466
0
BQ073103QB
50-466
0
Baker Tilting Servlceii Inc
B00707012B
71-392
Q 007070 133*
71-392
Baltimore Ga-a k Electric CD
8007010339
30-317
p
BOO701Q399
30-317
R
6007010390*
50-317
R
B 0070 10372*
30-317
R
B 007020 349
50-317
P
6OO70B0349
50-317
P
6007020334"
30-317
P
8t>Q7020334»
50-317
P
8007020436
3O-3 1 7
P
6007020436
50-317
P
6O07020443*
30-317
P
6OO 7020 442*
50-3 1 7
P
BO070E044a»
50-317
P
6O0702044S*
30-3 1 7
P
6007090271
30-317
P
BQ07090324
30-317
P
EQ070903S6
50-3 1 7
Q
BO 07090359*
30-3 1 7
Q
BOQ710022B
30-317
Q
8007100228
50-3 1 7
Q
9007110203)1
NUnEQ
BC07110207»
NUREC
BQ07160243
50-3 1 7
F
BO07160245
50-317
F
B007170111
30-317
Q
BO07 170352
50-3 1 7
P
8007170332
50-3 1 7
P
800717O353*
30-317
P
8007170333*
50-3 1 7
P
fl 007 170 576
30-3 IF
Q
B0071B0600
30-3 1 7
Q
6007210044
30-317
Q
6007210044
50-317
0
60Q7EEQ331
30-317
r<
8007220351
SO-3L7
R
6007220399*
30-3-17
R
S 00722 0-399*
50-317
R
3Q07S2&590
30-317
F
8007230-025
71-303
B 007230 175
PR
B007240152
SO-31B
$
BQ07240153*
50-31B
•B
B0072 50662
50-317
•Q
BOQ72 30662
30-317
0
B007280451
50-317
3
BQQ78a0453*
30-317
5
9007230491
50-317
F
3007280664
50-317
S
90072 &Q676»
SO-3I7
S
3007300351
50-3 IB
S
Hangar Hijdro-El ectrlt Co
B0070S0031*
30-443
I
Barbaij Engineer*! Inr
B007 1 602S9*
CONTRACT
Barr Engineering Co
8007220307
40-299
1
Battelle Memorial Institute
30073 00249
PR
i
Baltelie Memorial Institute, Columbu*
B007140220*
FOIA
i
Laboratori »
3007150712*
30-219
R
B007E 30201
NUREQ
B00724Q394
NUFIEQ
S00725011O
71-5957
8007250115*
71-3957
462
CORPORATE SOURCE INDEX
AUTHOR
AFFILIATIC1U
ACCESSION
DUMBER
SUBJECT
CATEGORY
B007E90Q04
RES
B00731QIB1
RES
B0073101-B3
RES
Battalia Memorial Institute' Pacific
BOG7010ia7«
FOIA
Narthua* t Labor a tori;
aao7oioi9i«
FDIA
BQ0701O238*
FOIA
B007020016
RES
BOO7 030350
NUHEG
BOO 7090 1B6»
70-1237
BO07IOO37B
PKM
9007170311
NUREQ
BQ071S033Q
RE9
8007210001
RES
B007210315*
70-1257
BOD72200I9
NUftEO
8007E30Q5B
R€S
9007240293
Nynee
3007360002
RES
0007250203*
FOIA
8007290246
RES
8007300014
PR
8007300113
PR
G0073101B7
RES
6007310210
NUREO
Dear Creoli Uranium Co
6007240007
40-B4S2
Bechtel Asinciatel Prof* i* tonal Corp
BQQ7070S34*
50-331
P
Dechtal Corp
B007O3024B*
30-416
A
B007 1-10043
PR
8007140049"
PR
8007140123*
30-155
Q
BQ07130BQ6*
50-S33
Q
B00722O396*
30-331
P
5007230464*
SO- 331
P
6007330551*
30-230
P
B007HB0556*
50-230
P
•B007300314*
30-462
A
3007300314*
30-4B2
A
8007300314*
30-4B2
A
G007300517*
50-4B2
A
80073003174
SO-4B2
A
6007300317*
30-492
A
600730 0520*
50-498
A
6007300321*
30-182
A
BOO7300322*
50-492
A
BOQ73Q0322*
SO-flB2
A
B007300522*
50-4B3
A
BOQ73Q0324*
30-4B2
A
60073005261
30-432
A
BG073Q0326*
so-iaa
A
BOO 7300326*
30-4B2
A
90 07300 52a»
30— 1BZ
A
BO 07300529*
3Q-4B2
A
6007300S29*
50-4S2
A
BO 07300 S29»
50-4S2
A
8007300533*
30-492
A
8007300533*
30-482
A
SO 07300 933 H
30-4B2
A
8007300534H
5O-4B2
A
Q0073D0534*
50-4B2
A
8007300534*
50-4B2
A
B007300535*
30-462
A
BOQ7300S36*
50-482
A
BOO730OS36*
50-492
A
BOO 7300336*
50-483
A
8007300S3B*
50-132
A
8007300538*
50-4B2
A
BOO7300S38*
SO-4B2
A
B0073QO339*
50-4B2
A
B007300340*
SO-4B2
A
8007300342*
so-4aa
A
B007300342*
3O-48B
A
8007300342*
50-482
A
B00730O343*
50-462
A
B007300S-IA*
50-4BB
A
B007300S4A*
50-462
A
30073 005«(i*
90~482
A
8007300547*
so-iaa
A
8007300547*
50-482
A
a0073005<7*
50-403
A
H007300349*
SO-402
A
B0073003-I9<f
30-483
A
B007300S49*
30-402
A
S007300551*
50-462
A
0007300334*
30-462
A
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEOOR1
1
B00730035&*
30-462
A
0007300339*
30-402
A
a0073003i2»
50-462
A
0007300364*
50-4B2
A
0007300364*
30-482
A
0007300564*
30-492
A
B007300S66*
50-482
A
H00730056fi»
90-482
A
0007300570»
50-482
A
Q*chtil Poulr Corp dub* of Bechttl
8007020118
REOOD
Carp )
80O71OO062*
30-344
0
8007110073"
OA999
90071301 16
PR
8007230042
PR
6007300432
TOPREP
Hindi i Corp
8007300390*
CONTRACT
Derjt n-Pjttlrton Pipe Support Corp
8007890448
30-322
9
Bernard John«or>j Inc
8007290143
HUREO
Dethlihem Stetl Corp
B007 130004
PR
3 lack t Veitcfi
8007140454
PR
BUcV Hllll Alltancii
8007 1 40674
FOIA
BQ0722Q237
40-299
Gosinj Co
B0072802IB
40-8401
[Took*, Q L
8007820SSO
40-1162
Borg-H*rner Corp , Nuclear Valvo Div
B007070034
XPORTL1C
Qniton Ediion Co
6007010340
30-293
8
0007010343*
30-293
S
BOO 7030 U2
50-293
F
0007030287
30-293
S
6007030289*
30-293
8
B007070337
30-293
8
B00707037B
30-293
B
B0070703B2*
30-293
a
6007070300*
30-293
B
B0070aolB2
30-293
B
8007000192*
30-293
8
6007060196
30-293
3
0007080200*
30-293
8
B007000202
30-293
a
0007080203*
30-293
a
8007140413
30-293
Q
0007130132
PR
8007150557
50-293
p
8007130699
50-293
R
S007 150704*
30-293
R
6007160641
50-293
8
6007 160648*
50-293
B
B007180393
30-293
P
6007180403*
30-293
P
8007210006
30-293
Q
8007210301
50-293
Q
B0072 10373
30-293
Q
8007230196*
30-293
Q
8007230309
50-293
Q
S0072B02B2*
50-293
Q
S007290396
30-293
P
Eoiton Univ Medical Cinter Bo»ton,MA
80070904 16
REOOD
Branch Radiographlc Laboratories.! Inc
8007390929
71-368
6007290931"
71-363
Brand & Hill
B007230483
30-393
M
BOO 7230302*
50-395
H
Drand-Rfi Co
0007220 169*
QA999
DrlpBi Engineering t> Telting
8007020463
FOIA
Dromon Hethodilt Hoip Ka lama zoo, MI
0007060273
40-9036
8007080270*
40-8036
Brookhavan National Labor J tor ij
6003130445
RES
0007010062*
FQI A
B0070I0372
30-263
F
6007010379
50-335
F
BOQ7Q300B5
RES
8007020364
RES
0007140361
30-171
F
8007150066
RE8
0007180233
RES
B0071B0240
RES
B007180245
RE6
8007160233
RES
Q007180361
RES
8007210003
RES
BOO 7210005
RES
8007210007
RES
6007210010
RES
8007210014
RE8
8007220047
RES
CORPORATE SOURCE INDEX
463
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEQORY
8007220053
RES
8007230659*
FOIA
8007240294
REB
8007290562
50-237
F
8007290634
30-409
F
8007310216
NUREQ
8007310217
NUREG
S0073 10234
NUREQ
9007310471
NUREG
Broun tc Caldu* 1 1
8007010226*
30-206
R
Q00710026B*
30-206
R
Broun & Root Carp (tub* af Halliburton
B007290441
50-499
S
Corp }
Brounivi 11*. TX
S007 150449
50-445
M
Bruce Norton
8007180405
50-273
0
Burnt & Rot Co
8007010004*
50-397
A
B0070 10007*
50-397
A
8007010018*
50-397
A
9007010021*
50-397
A
B0070 10023*
50-397
A
B007O 10032*
50-397
A
B007010033*
50-397
A
B00701003B*
50-397
A
8007010041*
50-397
A
8007010045*
90-397
A
BQ07010049*
90-397
A
BOQ7010052*
50-397
A
8007010034*
90-397
A
8007010038»
30-397
A
9007010059*
90-397
A
8007010061*
50-397
A
8007010064*
50-397
A
8007010069*
30-397
A
8007010073*
50-397
A
8007010076*
50-397
A
8007070290
TOPHEP
8007160109*
QA999
C-E Qp«r»tinn Plantt Ouintn Croup
C-E Power Sijttsmj
8007020557
8007020102
50-253
71-6078
P
8007020105*
71-6070
8007020107
70-1100
B007030108*
71-607B
8007020112*
71-6078
B007020114*
70-1100
8007020115*
71-6078
8007020974"
50-293
P
8007020574*
30-255
P
B007020374*
SO-235
P
B007020974*
50-255
P
B007020374*
30-255
P
8007020561*
50-235
P
8007020381*
30-233
P
BO07D20981*
50-295
P
8007020381*
50-239
P
B0070305B1*
50-355
P
B00702Q5B9*
50-239
P
8007020388*
90-233
P
B007020SQ8*
50-253
P
B0070205B8*
50-239
P
BOO7O2098B*
30-233
P
B007020393*
30-299
P
8007020593*
50-239
P
8007020593*
90-233
P
8007030593*
30-235
P
8007020993*
30-233
P
B007020599*
50-253
P
8007020599*
90-235
P
B007020600*
50-299
P
8007020600*
50-255
P
8007020600*
30-255
P
8007020600*
30-253
P
B007020600*
50-235
P
8007030343
PR
8007070351
NUREO
B007080274
TOPREP
B0070B02B5*
TOPREP
8007090333*
30-317
P
8007090332*
50-317
P
8007090341*
50-317
P
8007090341*
30-317
P
8007090346*
90-317
P
8007090346*
30-317
P
B00709Q392*
30-317
P
800709036B*
30-317
P
B007100219
TQPREP
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUHJECT
CATEGORY
8007100330*
TOPREP
9007140613
71-6294
3007140620"
71-6294
B007 160491
NUFiEQ
9007220433
70-1100
C F Braun >. Co
8007210233*
TOPREP
California State Univ, Northr idge
9007010374*
50-36! A
California, State af
9007020316
State Pray
80Q703004&
SO-27S 0
3007030104
PR
90071 OOOB6
PR
9007140032
PRM
B007170145*
CONTRACT
800725042?
30-275 Q
8007290044
PR
9007230486.
50-206 P
900739062?
30-312 P
B007300110
30-273 Q
9007300419
50-275 Q
B00731O389
50-312 0
California, Univ of, Berk el eg
B00709O277
•50-324 H
9007250072
FOIfl
California, Univ of, Davis
B0070B0353*
PR
Call formal, Univ of. Irvine
9007150615
50-326 R
B007 150620*
20-336 R
California, Univ of, Lot Angeles
B00701O619*
CONTRACT
BOQ7O9O197
30-142 Q
B0071 60240
SO-142 F
9007230309
50-3 0
Calvert County, MD
6007210416,
50-317 E
Camp Dreiser !< McKeei Int .Environmental
8007110457*
WASTE M8T
Sc icncei, Div
Canada
8007110013*
XPDIiTLIC
Capital Legal Foundation
800703026?
PR
Carolina Environmental Study Group
BQ0703003A,
30-369 0
9007030036
30-369 0
9007030040"
50-369 0
B007030040*
50-369 Q
Carolina Power 1 Light Co
B0070 10307
50-361 F
9007010324
50-324 F
B007O1Q324.
50-324 F
BQ07OI0342
30-324 F
8007010342
50-324 F
B007010352
5-0-40O F
8007010352
50-40G F
8007010352
S-0-40O F
8007010353
50-40O F
80070 103B4
90-261 P
3007010401
30-24 1 Q
B00701O40S
50-261 S
B007010410
90-261 S
B007010416
50-323 P
9007010423
50-324 P
9007010433
90-324 P
B007010425
30-334 0
80070 1D425
50-324 0
8007010431"
50-324 Q
80070 1Q431»
30-324 0
8007010461
30-361 S
g007OtO46&
50-261 B
9007010301
30-329 S
B007010509*
50-325 S
8007010513
30-325 S
80070 10514
50-2dl F
3007010521*
50-323 a
B007010SS6
SO-323 8
B0070 10564*
50-333 S
B0070 20087
50-261 fl
8007020334
50-334 S
B007020361*
30-324 3
9007020427
30-400 A
6007 020427
30-400 A
8007020437
50-400 A
8007020437
90-400 A
B00702034Q
50-324 9
8007020563
50-324 S
9007070234
50-323 5
8007070237 »
50-323 S
80070B0180
30-325 S
9007090 1Q 3*
50-325 8
BOQ70B0249
50-400 B
8007080237*
50-400 B
8007100031
90-261 0
6007100297
50-400 0
8007100377*
50-324 Q
464
CORPORATE SOURCE INDEX
AUTHOR ACCESSION
AFFILIATION NUMBER
SUBJECT
CATEQOnV
9007100416*
50-400
Q
8007100432*
SO-400
Q
B007 110409
50-324
R
S0071 10405
50-324
R
8007110406*
30-334
f!
B007110406*
30-324
R
8007140393
30-334
S
0007140399*
30-324
5
B007150097*
30-361
0
8007190492
30-334
Q
BQ07 150535
30-400
A
0007150626
90-361
P
80071 50629
50-261
a
B007 150633*
50-261
R
8007150634
90-325
B
0007150663*
50-325
S
H007160377
50-400
S
8007160632
90-324
8
6007170366
50-400
K
6007170366
50-400
K
0007170366
90-400
K
0007170366
SO-400
K
6007170367*
30-400
K
8007170367*
50-400
K
8007170367*
50-400
K
9007170367*
50-400
K
8007170372
30-400
K
B007 170372
50-400
K
8007170372
30-400
K
8007170372
30-400
K
9007170377
30-400
K
8007170377
30-400
K
B007 170377
30-400
K
B007I 70377
30-400
K
0007170516
30-334
0
S007170516
30-324
Q
9007170341
50-400
K
0007170341
50-400
K
S007 170341
50-400
K
8007170341
30-400
K
B007 170373
30-400
K
9007170972
50-400
K
8007170372
30-400
K
0007170372
30-400
K
80071 70579
90-400
K
600717037B
90-400
K
B00717057H
90-400
K
B007I 70578
30-400
K
8007170594
90-400
R
B007170S94
90-400
K
6007170394
30-400
K
8007170394
90-400
K
8007170600
30-400
K
6007170600
90-400
K
8007170600
90-400
K
8007170600
50-400
K
B007170613
30-400
K
8007170615
30-400
K
8007170619
50-400
K
B007170619
30-400
K
8007170627
30-400
K
8007170627
50-400
K
B007 170637
30-400
K
B0071 70627
30-400
K
8007170628
30-400
A
8007 17062B
30-400
A
0007170628
30-400
A
6007170630
50-400
A
8007170639*
30-400
A
9007170639*
30-400
A
8007170639*
30-400
A
8007170637*
30-400
A
B007 170643
50-400
K
8007170643
50-400
K
8007170643
30-400
K
8007170643
30-400
K
8007170650
90-400
K
6007170650
30-400
K
G0071706SO
50-400
K
8007170690
30-400
K
9007170633
90-400
C
8007170632
30-400
C
6007170692
50-400
C
80071 70633
30-400
C
8007170639
90-400
K
AUTHOR ACCESS I ON
AFFILIATION NUMBER
SUBJECT
CATEOOflV
00071 70633
30-400
K
0007170633
50-400
K
B007170633
90-400
K
0007170661
30-400
K
8007170661
50-400
K
H0071 70661
30-400
K
BQ07 170661
90-400
K
8007 170663*
90-400
C
Q0071 70663*
30-400
C
90071706630
90-400
C
B007 170663*
30-400
C
8007170672
30-400
K
9007170673
30-400
K
8007170672
30-400
K
8007170A72
30-400
K
0007170677
30-400
K
8007170*77
50-400
K
8007170677
90-400
K
8007170677
30-400
K
B00717067B*
30-400
C
5007 170679*
30-400
C
800717067B*
BO-400
C
8007 170678-
30-400
C
00071 706B4
50-400
K
8007170684
30-400
K
80071706B4
30-400
K
B007 170604
SO-400
K
0007170686*
30-400
C
8007170606*
SO-400
C
S0071706Bi»
30-400
C
8007 1 70696*
SO-400
C
B0071 70607
90-400
K
8007170687
90-400
K
8007170607
30-400
K
8007170687
SO-400
K
0007170690
90-400
K
8007170690
90-400
K
B007 170690
30-400
K
B007170690
30-400
K
8007100428
90-400
V
8007210022
90-261
Q
8007210415
30-324
P
0007250210
30-400
Q
8007320227
30-361
a
0007220294
30-261
a
8007220260
30-324
a
B007220426
30-261
V
8007220427*
90-261
V
B007S20433*
30-261
V
0007220433*
30-261
V
800722043B*
30-261
V
9007220440
30-261
a
000722044B*
30-261
a
0007220436
30-400
A
8007220436
30-400
A
8007220496
30-400
A
8007220436
30-400
A
9007320464
30-324
B
8007220470*
30-324
S
8007220321
30-324
B
8007220521
30-324
B
8007230247
30-400
B
0007230247
30-400
8
8007230247
30-400
9
8007230247
30-400
B
8007240131
PR
000724018?
30-324
Q
8007240169
30-324
a
8007240196*
30-324
a
800729029&
30-324
Q
B007250334
30-324
S
8007290341*
30-324
B
B0072B0420
30-261
P
0007280104
50-260
a
80072B0111
30-324
a
S0072B0307
30-400
R
B007280307
SO-400
R
B007280507
80-400
R
S007290307
30-400
R
9007280513*
30-400
R
8007280313*
30-400
R
8007280313*
90-400
R
8007280913*
30-400
R
8007200679
30-361
P
B0072906B6
30-261
P
CORPORATE SOURCE INDEX
465
AUTHOR
ACCESSION
SUBJECT
AUTHOR
ACCESSION
SUBJECT
AFFILIATION
NUMBER
CATEOGR'
f
AFFILIATION
NUMBER
CATEOORV
B007290690
50-261
P
8007310123
30-445 0
8007290723
30-324
P
8007310123
30-445 Q
9007290S23
30-335
a
Cltlieni Conce-rned About Nuclear Pauier,
B007300413
50-490 0
8007290826
30-335
s
Inc
B00729083i*
50-323
3
8007310145
50-498 0
CJtliBns for Energy tr Employment
B0070BOOOH
30-452 fl
3007290833*
30-325
S
S007 300361
50-324
Q
Cltlieni for Equitable Utilities
SOO731014B
30-498 0
B007300361
50-324
Q
Citlteni for Safe Environment
S007210J5B
HASTE HOT
B 0073 10206
50-324
Q
Citiient for a Better1 Environment
B007020I9S*
50-10 H
B 007310206
50-324
Q
B007 030203 "
50-10 H
8007 1 40337
50-60 0
8007310306
30-324
Q
9007310306
50-324
Q
H007ta01B7»
5O-10 0
8007310449
50-324
Q
B0071802I2-"
50-10 0
9007310449
50-324
Q
8007220940
50-tO D
Carrier Corp Carrier Air Conditioning
0007170236
SO-SiB
S
8007230649
30-10 D
Div,
8007260537
50-10 0
8007170247
30-518
S
Cltiion* for the Con icrva 1 1 on of Natural
B007 140391
30-376 Q
Case H«i turn
7910150157
40-4669
Ruiourcuii Inc
6007030099
40-4669
8007230791
50-376 0
Catalytic, Inc dubi of Air Producti i
8007160446
REOOD
Cleveland Electric Illuminating CD
B0070BOS94
30-440 B
Chemicalii Inc )
80071 4O534
90-440 B
8007160230
REOOD
80071 SO34Q
90-440 A
Centtr for Lay lc Bocial Policy
8007310237
FOIA
B0071SO533
30-440 a
Center for Law in tne Public Interait
8007020136
FOIA
6007150353
30-440 Q
8007140228
Ft) I A
H007160598
50-440 5
800723050B
50-E73
Q
S007180406
90-440 Q
9007300096
30-273
o
8007IB05S3»
50-440 a
Central & South W*»t Corp
8007130431
50-445
M
BOO71903B3*
SO-440 Q
Central Electric Power Cooperative, Ine
8Q07S50493
50-395
M
80O7180371*
90-44O Q
Central Maine puuier Co
80070S0016*
30-443
I
SOO7IB0591»
30-440 Q
Central Vermont Public Set-vies Corp
90070B001B*
90-443
I
BOO723010I
50-44Q Q
Ce-raci Inc
B007020379
XPORTLIC
80O723010I
50-44O G
Ch*ffl-Nucl»ar Sgitifflii Inc
80070104B2
27-47
9007230331*
50-440 Q
9007100461
71-9094
S007H30321 *
30-440 Q
B007160417
71-9070
8007390533
30-346 M
B007 170446*
90-320
P
Cleveland. OH
B007I40B7S
50-346 M
8007170432*
50-320
P
ClevBland-Clif f « Iron Co
8007290949
40-8200
B0071.7Q4S3*
90-320
P
3007310497
40-8714
B00717045B»
30-320
P
Colorado State Univ
8007 1 70297*
40-Bfi02
80071704641
50-320
P
B007170302«
40-B60B
B0071 70466*
30-330
P
B00717030B*
4O-8602
8007170473*
30-320
P
8007170329^
40-B6B1
BO0717047B*
50-320
P
B00717033H
40-9681
80071 704B2*
50-320
P
BOO7 170332*
40-8681
B0071704B8*
30-3=0
P
BOO7 170333*
4Q-B6B1
B007170490*
50-320
P
3007210177
40-8452
8007170499*
90-320
P
8007210183
40-B452
B00717050H*
50-330
P
8007230135
40-9432
B007I70303*
30-320
P
B007230729»
40-HO2
B00717O311*
30-3-20
P
BOO72SC-066
•10-9602
8007170521*
30-320
P
60O7200070
40-B681
6007170333*
30-320
P
B 0072600 73
40-B4S2
9007170333*
50-320
P
ColorjdOi State of
BO070I0274»
WASTE MOT
Chnmtron Corp
BOO? 180478*
30-320
H
8007020399
WASTE MOT
8007230100
40-7402
•80072 101601"
CONTRACT
Chemtran Corp , Tub* Turn* Div
B007210079
PT21
Colt Industrie!, tnc
8007090270*
30-352 8
Chan fi Anociateii Inc
8007210163
40-2259
S0070'J0273»
90-35B 8
Chevron Reieareh Co
B0071O0133
REOOD
Colt Induibri.es, Inc . FairSanlti Mor»e
6OO701O397
50-373 8
Chickering & Oregarij
8007140034*
50-361
o
Engifii Div
G0073O039?
30-361
0
8007010459
90-373 B
Chri*ta-Marla
S0071O0037*
30-135
<3
Combuiticn Eng inevring . Inc
8007020103*
70-1100
8007100042*
50-153
Q
8007090361*
50-317 P
8007100210
TDPRE-P
Cincinnati Oai t Electric Co
80070100S4
50-358
a
B0070702SB
50-339
F
8007100212*
TOPBEP
8007080317
50-3 58
A
8007110243
TGPfiEP
B0070S0374
50-359
a
BOO711024Si
TQPFtEP
S007140369
3Q-3SB
K
BOO? 140037*
QA999
80 07 180 4 96*
TCIPREP
6007140377*
50-3 SB
K
90 07 190108*
50-358
0
BOQ725CG57*
QA999
8007210302*
30-3 SB
a
8007260737*
70-1100
9007210313
30-358
a
Commerce. D»pfr of
9007020533*
CONTRACT
B0072 10424
50-3 SB
K
8007240381
Pft
Comment, Dept of. National Gceanographlc t
9007240409
NUREO
BO 07220280
50-338
A
Atmoiphiric Admi nt-trat 1 on
8007230437
50-3 3B
a
90072S0576
50-359
Q
Committti for Application of Nuremberg
8007110001
30-498
8007290616
50-338
Q
Prlnclplfi to US Mucltar Power Pruductloi
i
90072BQ096
50-358
a
Coir-monuialth Edlion Co
800-7010190
30-237 r
8007010190
50-237 P
Cltiieni Agatn«t Nuclear Pnmer
SO 07230369
50- 1O
D
8007010211
30-293 P
Citiient Aiiociatlon for- Sound Energy
9007090327
50-443
0
6007010BH
50-293 P
8007220546
50-445
a
8007220346
30-445
a
8007010347
50-10 F
8007220599
50-445
Q
B0070I0347
30-10 F
B007010347
30-IO F
8007250399
50-443
6
8007010347
30-10 F
SO 07300366
50-445
0
B0070I0347
30-10 F
8007300366
30-443
0
66
CORPORATE SOURCE INDEX
AUTHOR ACCESSION
AFFILIATION NUMBER
SUBJECT
CATECGRV
8007010347
50-10
F
B0070 10347
50-10
F
60070104 11
30-494
A
B0070I042B
50-295
P
6007010484
50-295
S
6007010453"
50-295
S
B0070 10493
90-293
S
B0070I0497
50-237
S
B0070 10300*
50-295
S
B0070I050S"
90-237
3
B0070 10544
50-237
S
B00701QS51*
50-237
a
6007020050
50-295
Q
6007030074
50-249
Q
6007020076
50-293
0
B007020076
50-295
Q
B0070303B3
PR
8007020403
50-454
K
B007020408
30-434
K
B007020403
50-494
K
800702040B
SO-434
V.
B007020420*
30-454
K
B00702O420*
50-454
K
BOQ702Q420*
30-45*
K
B007020420*
90-45*
K
8007020462
50-39?
0
B007020631
30-43*
a
B007020631
BO-454
a
B007020756
50-349
Q
B007070116
50-10
P
8007070116
30-10
P
B007070116
50-10
P
B007070267
30-373
K
B007070267
50-373
K
8007070349
50-237
P
8007070349
30-237
P
8007070343
90-237
P
B0070B0063
50-10
P
8007080162
30-265
9
8007080172*
30-265
B
B00708024B
TOPREP
B0070B0299
30-434
K
B0070B0299
50-434
K
B0070B0299
30-434
K
B0070B0299
50-454
K
B007100004
50-10
Q
B007100004
30-10
0
B007100004
50-10
0
B007I00130
PRM
B007I00142
90-2S4
P
B007I00142
50-254
P
8007100147*
30-234
P
8007100147*
30-H34
P
0007100179
30-237
8
8007100187
90-237
S
8007100IB9*
90-237
B
8007100192*
30-H37
B
B007 100343
PRM
B007110206*
30-10
Q
B007 140233
PRM
B007 1*0320
90-45*
K
B007 1 40327
50-299
H
6007140327
90-293
n
B00714032B*
30-*94
V,
B007 140331*
50-295
n
8007140331*
90-299
R
6007150*76
30-293
P
B007190476
30-299
P
B007 150929
50-373
A
8007150616
30-B5*
J
8007190619
30-83*
R
B007150619
30-29*
R
8007 150623*
30-25*
R
B007 1 50625 »
90-83*
R
6007160559
50-454
K
6007160606
30-373
A
8007160627
50-599
C
6007160630
50-237
Q
8007160630
30-237
Q
8007160655
30-295
B
6007160662*
50-295
B
80071A066B
50-304
B
8007140672*
30-304
B
8007180010*
30-10
0
8007100031*
COMMISSION
AUTHOR ACCESSION
AFFILIATION NUMBER
SUBJECT
CATEGORY
BOQ7 180333
30-10
R
B007 160333
90-10
R
BQQ71B0333
90-10
R
BQ071B0336*
90-10
R
B0071 80336*
90-10
R
0007180336*
90-10
R
B0071B0560
30-3
Q
B007180560
30-3
Q
0007100579*
COMMISSION
B007190392
30-3
0
B0071S0392
30-3
0
B007210212
SO- 237
P
8007210212
90-237
P
8007210212
30-237
P
8007210292*
90-373
a
8007210292*
30-373
Q
B0072203S2
TQPREP
B007220334*
TOPREP
B0072203S7"
TOPREP
B007220339*
TOP HEP
8007280361*
TDPREP
8007220387
30-304
8
8007280391*
90-304
8
8007220399
30-293
Q
8007220400
90-293
5
8007220401
30-295
B
BOO 7220402
30-293
8
BD07220404
30-293
B
BOQ722Q403
30-299
B
8007220406
30-304
B
B00722040B
30-304
B
8007220409
90-304
8
8007220411
90-304
a
B00722Q412
30-304
e
0007220413
30-304
8
0007220414
30-304
8
8007220449
90-299
8
80072B0433*
30-293
S
8007220493
50-249
S
£3007220439*
90-249
8
8007220318
90-373
A
8007220340
90-494
K
8007220997
30-237
B
6007220572*
90-237
B
8007220977
90-249
B
B0072203B3*
30-249
6
8007220387
30-304
8
0007220993*
30-304
S
BD072301G7
PR
B007230281*
90-373
a
8007830339
90-237
8
8007230349
30-293
B
8007230347
30-293
B
8007230331
30-293
S
8007230392
80-299
8
0007230337
30-299
8
8007230339
30-249
S
0007B30397
30-249
8
8007230678*
30-10
D
8007240103
90-234
B
8007240109*
30-234
8
3007340112
30-263
B
8007240114*
30-263
8
8007240298*
30-249
Q
8007240331*
30-496
a
0007240351*
30-436
a
8007250448
30-373
A
8007230433*
80-373
A
80072S0467
30-373
Q
8007290638
90-10
Q
8007230638
30-10
a
800723063B
50-10
a
B007230638
90-10
Q
0007230638
90-10
Q
800723063S
30-10
a
8007230641
30-10
Q
8007290641
30-10
a
60072B0641
30-10
a
8007290641
30-10
a
B0072S0641
50-10
a
B0072S0641
30-10
a
0007230641
30-10
fl
B0072SO&30
90-10
Q
80073306.30
80-10
G
8007250650
30-10
a
CORPORATE SOURCE INDEX
467
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEGORY
B007250630
50-10
Q
8007350650
50-10
a
8007230690
30-10
0
8007250650
50-10
a
BO 0728 007 4
30-254
0
0007280470
50-365
p
B0072B0474*
30-265
p
8007200567
NUREQ
80072B0595
50-10
D
8007280605
30-393
P
BQ072B0605
30-295
P
B0072S0670
30-434
5
8007280600*
30-373
Q
8007290670
SO-4S4
K
8007290690
30-373
A
8007290709
50-254
J
8007300469
PR
8007300485
50-237
Q
B0073004S3
50-237
Q
8007300485
50-237
a
8007310353
30-234
0
8007310353
30-254
a
B0073 10337
50-254
Q
8007310432
30-10
Q
B0073 10400
30-249
a
8007310406*
30-B49
a
000731 OS33*
50-373
a
Conftrtntt of Radiation Control Program
8007280170*
COMMISSION
Dinetorii Ini
B0073Q0018
PR
Congrtu (Joint & Rotating Committed.
8006170304
M18C
tic >
8007110363
50-320
u
Connecticut Light ti Pouitr Co
80070B0040I>
50-443
I
Connecticut YanVie Atomic Power Co
8007010337
50-213
F
BOO 70 10337
50-213
F
B007010337
30-213
F
8007020472
PR
8007020569
50-213
P
8007020569
30-213
P
B007030356
50-245
F
80070303S6
50-245
F
800703D3S6
SO-245
F
6007080077
50-213
S
3007090831
30-213
F
6007090331
50-213
S
8007090326*
50-213
S
8007100033
PR
8007140335
50-213
I
8007140339
50-213
3
800716036?
30-213
Q
8007170320
30-213
Q
8007170425
50-213
F
8007 1 70494
30-213
a
8007100390
50-213
R
0007180395*
30-213
R
8007100578
30-213
a
8007210239
50-213
p
6007230411
30-213
a
0007240033
50-213
p
8007240058*
50-213
p
B007240062*
50-213
p
8007240067
30-213
p
9007240070*
30-213
p
8007230939
30-213
s
8007290032
PR
8007300324
90-313
p
8007300331*
30-213
p
0007300330*
30-213
p
8007300342*
30-213
p
Contitc t icuti Btat* at
800701049B
NUF1EG
0007020536
PR
6007030113
PR
0007160358*
COMMISS1
:ON
Connirr Moon 1 Corner
6007020407
PR
B007 130058
27-39
B007 150309
30-272
o
8007310424
30-393
M
C<m»olidated Edison Co of Nau Yarli
8007010001
50-3
Q
8007010001
SO-3
a
0007020077
30-3
0
0007020077
50-3
a
0007030050*
PR
0007090228
50-247
p
6007090231
30-247
p
AUTHOR ACCESSION
AFFILIATION NUMBER
SUBJECT
CATEGORY
6007090279
5O-3
P
6007110396
50-247
S
B0071 10404*
50-247
S
B007140375
NUREO
9007 15066 9
50-3
R
8007170287
50-3
0
8007170363
SO-3
R
6007 1 70363
50-3
R
6007 1 70363
50-3
R
6007 1 7036 S*
50-3
R
6007170365*
50-3
R
B007 170365*
50-3
R
6007210473
50-3
R
B0072 10473
SO-3
H
6007230160
50-247
Q
3007220160
BO-247
Q
8007230434
50-347
P
8007220476
30-247
R
6007220479*
50-247
R
6007230304
50-247
P
BQ072S0523
=0-3
R
0007230323
SO-3
R
6007220333
SO-3
H
0007230524*
50-3
R
8007Z205S4*
50-3
R
8007220524*
30-3
R
8007230044
PR
8007230471
50-247
P
8007340127
50-3
I
60072-40127
50-3
I
6007340129*
50-3
I
8007240169
30-247
5
6007340172*
30-347
9
80Q7E90S22
30-247
fl
8007290662
SO-3
H
:onsoliditBd Rail Corp 6007030341
PR
;on*umer* Power Co BOQ70 10200
50-153
P
6007010313
30-1 SB
a
6007010447
50-153
p
6007010451*
50-135
p
8007010473
50-135
F
8007020226
PR
80070BO306
30-329
a
8007020649
30-329
a
8007030250
50-233
P
800703O251K
50-255
p-
8007030263
30-135
p
8007070119
50-329
A
8007070210
30-155
P
8007080189
50-255
S
8007QB0199»
50-235
a
B0070EQ33B
30-253
p
8007060346
50-155
R
60070B034B»
50- 1 53
R
6007O9000B
50-Z55
p
6007090010*
30-353
p
6007090043
50-329
a
6007090314
30-835
s
6007090319*
30-25S
S
6007100092
PR
8007100199
50-339
p
8007100201*
SO-235
p
8007100204*
50-333
p
8007110204
50-155
p
8007 1 1 0209*
50-155
p
8007110210*
50-153
p
8007110299
30-253
K
8007110301*
50-355
K
8007110399
30-233
P
8007110409
50-355
fl
B0071 10414*
50-255
R
B007 140004
30-369
0
6007140004.
50-369
0
8007140007*
30-369
0
6007H0010*
50-369
a
8007140010*
30-369
a
8007 1 40020
30-329
Q
8007140020
90-329
0
8007140310
50-353
a
8007140350
30-355
a
8007140391
30-135
F
B007 140391
SO-1SS
F
0007 140392
SO-3
P
6007140424
50-158
a
8007140444
30-135
Q
68
CORPORATE SOURCE INDEX
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATGOORY
S007140S43
BOO71 50052
80071501 34
BO 07 130 497
8007 ISO 497
PR
50-155 O
PR
30-339 A
30-329 A
-
B007130BO3
B-00716043B
8007160503
8007160612
30-155 Q
50-293 &
SO- 183 d
50-259 P
30-339 a
6007180424
60072 1O273
80072 1O394
8007210427
3007B 10440*
30-133 a
PRK
30-233 R
30-253 R
30-295 H
6007210483
9007210483
8007220194
000722:0341
B007220452
30-329 A
80-329 A
30-329 0
30-155 F
SO-1S5 Q
3007220472
8007320478
B00722O4B4*
8007230913
8007220566
50-185 Q
90-235 8
50-233 B
50-253 Q
30-183 F
B007 23039 S
8Q0723044O
B007230445
8007230473
900723047 B
50-233 0
50-255 0
50-159 Q
50-233 P
SO-139 F
B007a30479*
B0072304B4*
B007230516
9007230BIO
8007240017
80-139 F
30-331 P
30-135 Q
50-B99 0
30-135 0
B00724013&.
B007240146
8007240146
8007250373
B0072B0041
PR
50-329 K
30-329 K
50-155 0
50-329 A
8007280060
80072S0060
8007260124
B 007280533
B00728057O
30-339 A
90-3 29 A
90-329 B
30-153 P
30-135 F
8007280970
8O07280397
8007290206
2007290606
B007290&14
30-155 F
50-139 J
30-327 3
30-139 Q
30-233 B
B007S90616*
8007290630
BQ072706<71
8007290701
80073 00439
30-239 B
50-233 Q
30-139 Q
30-329 A
30-133 F
B0073 10177
B0073 10422
80073 1 Ola 9 »
800731 0168
B0073 10329*
50-255 Q
30-185 J
30-tS9 J
FOIA
50-329 0
Contra Coit« Industrial X-Raij Co
Contra Coat* Inspection Co
Caop*rativ* Poutr Aisoclabion
800731 03B9»
8007220279'
8007290877
BQ07 290B82*
B007010421
50-329 Q
71-9039
71-6717
71-6717
90-484 I
Coordination Council for North American
B007 170262*
XPORTUC
Corning Olan Uorki, Zircoa Product* Dlv
Cotter Corp
Coulee Region Energy Coalition
Council of Energy Rttouro Trtbei
8007230343
B0078I010*
BQ07140BK7*
B007030 1 98
40-2961
WASTE MOT
30-409 H
PH
Council on Environmental Quality
Crane Co
Crtarti Inc
Critical M*it Energy Project
B00709014B*
8007220 12U
8007240 lil*
B007820334*
B0072B0274
PR
50-399 0
30-339 P
TdPREP
FOIA
Cyprut Minn Corp
D'Appolonla Coniultlng Engin«»r». Inc
DHO International, Ire
8007020281
80070a07OB
8007020712*
B006240082*
8007290 B02
WASTE MOT
HASTE MOT
UABTE MOT
40-1162
XPORTL1C
Daedalean Anociateti Inc
Dairijlanif Poiuer Coopentlvc
8007230231
8007020679
BOO708030O
80071-10303
RGB
90-409 0
30-409 P
90-409 P
AUTHOR
AFFILIATION
ACCESS I ON
NUMBER
SUBJECT
CATEQQftV
0007140971
30-409 Q
B007U0677
00-409 R
80071606910
SO-409 R
S00717036B
90-409 0
B0071800V2
90-409 Q
H0071B0333
50-409 Q
8007180362
SO-409 Q
G007S 10447
30-409 P
8007320096
30-409 0
8007520323
30-409 P
8007S80050
50-409 Q
8007880696*
90-409 0
8007290430
30-409 Q
8007300244
30-409 Q
8007310434
50-409 I
0007310443*
30-409 I
Damn & Hoar*
0007210170*
40-4493
8007B20O48*
HASTE MOT
8007220049*
HASTE MOT
0007220526*
90-409 P
Darling Valve i M#g
8007240136*
30-339 P
8007240159*
30-339 P
Dartmouth Coll*gi
B007300399
TOPREP
Davy McKee Corp
8007240011*
40-0432
B007S40Q13*
40-0492
8007240013*
40-8432
8007240022*
40-0432
D«iun Mining Co
BOOT 190043
HABTE MOT
D* Laval Turbine Inc
B00721Q483*
50-443 A
8007H104B5*
90-445 A
00072 104?0»
90-449 A
B0073104900
50-449 A
8007H1049&*
90-443 A
B007210496«
90-443 A
Q007210900*
50-449 A
80072 10SOO*
50-443 A
8007210904*
30-443 A
B007210S04*
90-443 A
B00721O50a*
30-448 A
80072 10SOB»
30-448 A
8007210910*
30-449 A
aoo7aiosio»
80-443 A
B007210S14*
30-443 A
60072 109 14*
50-449 A
800721 OB 17*
90-440 A
B007210917*
00-443 A
B007210319-
30-443 A
B007210S11)*
30-443 A
8007210527*
50-443 A
8007210527*
90-445 A
D>b«val»i tiUibtrnian
B00703024i
90-443 0
8007100290
PRM
B007 140-004
80-3*9 0
0007140243
FOIA
8007160425
30-449 M
0007180437
30-443 0
8007840140
PR
800729O0B?
PR
0007310328
00-443 0
Diptn**, Dtpt of, Defint* Nuelaar Agency
00071BO342
REOOD
Delau«re< State of
B007140043
PR
B00714O964
PR
Dalta Switchboard Co
8007810927*
90-449 A
OtnnUomA D
8007110094
30-390 0
Detroit Edlion Co.
800707009B-
30-341 S
BOO? 140326
30-341 0
B00714037B*
80-432 0
B007140429
50-341 0
8007140481*
30-341 0
S0071606B7
90-341 A
0007170401,
30-341 8
8007210136*
80-341 0
8007880949
30-341 8
Dojgttti 8 A
0007100174
30-466 0
Uoh»r tg, J F
8007030339
80-466 A
8007230846
30-466 0
Donovan,! Hameitar fc Rattienr Inc
0007070034*
CONTRACT
Dou Chamleal Co
8007230476
TOPREP
Dow ChtmUal Co , Dou Chtmlcal U. 8 A
8007290709
PR
Oiv
Duk* PouiBr Co
0006090319
30-369 8
80Q70100A3
90-269 Q
8007010209
30-269 F
8007010809
50-249 F
B00701020B
30-869 F
CORPORATE SOURCE INDEX
AUTHOR ACCESSION
AFFILIATION NUMBER
SUBJECT
CATS DORY
B007010309
30-369
F
B0070I0360
50-269
P
8007010360
50-369
P
B007Q20537
30-413
S
8007020375
50-269
P
3007 020575
30-269
P
8007O20579
50-369
P
B007020468
PR
8007030097
PR
80070301B5
50-413
A
B007O30IB5
50-413
A
S007O301B6
PRM
B0070301B9*
50-413
A
B007O301S9*
50-413
A
BO07O70Q63
PR
8007070319
50-269
S
6007070319
50-S69
S
B007O70319
50-267
5
8007070333*
30-269
S
BO07O70323*
30-269
a
9007070323*
50-369
s
B007OB02O1
50-270
s
8007O8Q207*
50-270
s
BO07OB0223
30-S69
p
S0070B0233
BO-269
p
6007080223
80-269
p
BO07080349
30-369
A
8007090271
90-269
p
B007O9027I
30-269
p
BDQ7O90276*
30-269
p
8007090276*
30-269
p
8Q07O90402
PR
0007100036
50-369
0
6007 1 00 13?
50-270
a
8007100419*
50-413
a
80071 10294
50-269
p
8007110294
50-269
p
BD07110294
50-269
p
B0071 10309
50-369
A
BO071 10331*
50-269
p
8007110331*
50-269
p
SOQ71 10331*
50-269
p
80071 10360
50-269
s
B0071 10362*
50-269
s
8007140083
NUREQ
8007 1 40397
50-269
p
B007 1404A3
50-269
Q
6007140463
50-269
Q
BO07 140463
50-269
Q
BOO? 1500 19
30-269
0
8007150573
30-269
P
B007150575
30-269
P
80071 309B3»
50-269
P
S0071505B3*
50-269
P
80071 60S 14
50-413
S
BOO? 1605 14
50-413
5
BO0716051B*
30-413
B
B007 1 606 57
50-369
8
B007160657
30-369
5
BOO? 1 60663*
50-369
8
BOO? 1606 A3*
30-369
S
B0071701O5
PR
SQ071B0321
50-270
3
8007IB03S6*
50-270
8
8007180349
50-270
Q
S0071B0417
50-2B7
B
B0071 80933
50-269
0
8007180933
30-269
a
8007180533
50-269
Q
8007210114
30-369
a
8007210114
50-367
a
8Q07210261
30-413
a
BO07S103B5
30-369
A
B007210417
30-269
S
BO072 10421*
50-269
S
8007210425
50-270
P
80072 10426*
50-270
P
B007210459
30-269
8
8007210470*
50-269
B
B0072 10476
50-413
A
8007210486*
50-413
A
9007210486*
50-413
A
9007210609
50-2B7
S
S007210617*
30-207
S
8007220192
50-269
0
AUTHOR ACCESSION
AFFILIATION NUMBER
SUBJECT
CATEGQF1V
30072301'??
50-269
,-,
BOD 72201 9?
30-569
fl
6007220343
50-369
r>
BQD7220349
S 0-269
n
B007220249
50-269
0
B007220365
50-369
A
B007 320424
50-269
~
B007220427*
30-269
3
B007220477
5-0-269
P
B0072204B3*
5O-269
P
9007220536
5O-369
A
S007220561
5O-25<7
P
aoo?aao563
3O-269
S
9007220563
30-269
s
0007220563
3O-269
3
S007240357
3O-369
,-,
B00724O339
PR
B007a404A9
3O-369
ft
8007250166
30-269
n
8007 2 501 6i
SO-269
'-'
8007280166
3O-269
,-,
9007230532
90-4BB
fl
3007290396
3O-369
n
8007280068
SO-2&-7
fi
000723041*
50-270
Q
B007S30427
30-270
p
B007280427
30-27O
p
8007 230430*
50-37O
p
BOO7 280430*
30-270
p
BOO7 380437
30-269
P
6007280437
30-269
p
8007230437
30-269
P
BO 07 29O 43 Bit
30-269
p
6007280433 i
30-269
P
BOQ73B0430*
50-269
P
Q0072B0501
5O-413
S
30073 B034 4
5O-369
p
8007270267
BO-270
a
8007290635
50-287
8
8007290640*
50-237
8
B0072<?OB24
30-270
9
B007270B30*
50-270
a
H0073 00330
50-367
B
8007300330
50-369
a
8007300355
50-369
s
8007300459
50-369
A
9007310379
50-269
p
8007310379
30-269
p
90073 103BJ*
30-269
p
B0073103B1*
30-269
p
8007310382*
50-269
p
80073 103B2*
30-269
p
8007310491
30-270
0
luqueine Light Co 3006230660
50-334
0
30070 1O336
50-334
H
80070 1034B
30-413
0
3007010395
50-334
P
90070 1 O396
30-334
fl
9007010400*
50-334
a
80070 1O4 56*
30-334
a
a00701O52£.
50-334
a
80070 IO936*
30-334
B
3007020316
30-334
n
3007020547*
5O-33fl
fl
BOO 7O7 0296
5O-334
3
B0070BOOSO
30-334
p
30070 B0094*
5O-334
p
B0070B0186
5O-334
f
a0070B027i
50-334
n
BOO7OB0424
50-334
Q
8007090334
50-334
a
3007090338*
50-334
3
9007070340
50-334
3
8D0709034B*
50-334
S
9007150480
50-334
P
B007 1 50483
50-334
Q
B007 1 50367
50-334
a
B007 1 50643
50-334
0,
E3Q07 160480
50-334
fl1
B0071609BS
30-334
P
B007 160964*
50-334
P
B007 160993
50-334
0
Q007 160647
50-334
4
S007I6D654*
30-334
<!
B007 170516
50-334
fl
170
CORPORATE SOURCE INDEX
AU THQR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEOOfiY
B007 160053
BOQ7la0317
90071&0322*
8007te041B
00071B0422*
50 -4 12 Q
50-334 S
50-334 S
50-334 R
50-334 R
8007210011
9007210016
8007320430
9007330434*
8007320506
50-334 0
30-4 13 Q
SO-334 S
30-334 S
50-334 S
B007220SBS
60072301 SO*
0007250294
9007350315
8007350321*
50-334 Q
30-334 0
90-334 Q
SO-334 S
50-334 S
6007350331*
9007290540
9007290643
9007H906SO
B0073003B3
50-334 S
30-412 R
30-334 P
50-334 Q
50-334 S
E L Conutll b Co
EDS Nuclsar, Inc
9007300336*
8007020650
B007O20432*
BOQ7300498*
9007300 4 98*
.30-331 S
71-381
71-391
50-237 Q
SO-B37 Q
9007300+98*
8007300*99*
8007300309*
H0073005.0B*
9007300909*
30-B37 Q
90-237 Q
3O-S37 Q
90-S37 Q
SO-237 Q
EQ5.G- Idaho. Inc
90073QQSOB*
8Q0730050B*
80Q703O015
BOOT 140093
9007150039
50-237 Q
50-237 Q
nes
mjREG
RES
8007150409
B0072B003B
€007230013
B007BSOQ&3
3007230173
RES
50-363 P
RES
HE s
SO-334 P
3007230177
B007S3Q183
B007230194
9007230205
8007230625
RES
RES
REB
NUREG
NUREQ
30072 SOI 86
BOO? £ 5030«
BOO 73 BO 164
6007260171
9007280171
50-313 P
30-325 P
RES
REB
RES
9007280176
80072SD1B6
B007290163
B00729Q1BO
8007 390 11? I
RES
RES
S-0-324 P
RES
RES
EGiO, In«-
9007290201
800J290226
S00731O007
B0073102S-8
B00703020-S*
RES
RES
NUF5EO
MUREO
50-385. P
Ea-stern UtiHtlt* Anoclat**
80O71003&3
9007210017
B007210AOB
BOQ72B090B
9007QB0020*
HUREO
ftEB
REB
NUREO
50-443 I
Eastman Kodak Co
Eb-atco B*rvice*j Inc. Ctubs at Enierch
Corp )
Ebirlin* Iintrumen* Corp
Eckertr Seamani. Chit-in & KUlott
9007010266
BO 0^0203 26»
9007170129«
3007220560
9007890683
40-8439
50-339 0
CONTRACT
XPORTLlC
XPORTLIC
Ecotairt Condtnseri Inc
Eco-logij Action of Qiuego
90073 I 037S
B0070B0046
B0070Q0046
B0070B0046
90070B0046
3Q-2B7 H
50-320 0
50-320 0
SQ-320 0
30-320 0
8007080046
8007090046
9007080049
BQ07080049
B0070Q0048
50-320 8
50-aao o
50-320 0
50-320 0
50-330 0
8007080048
90070B004B
60070H004S
800731 01 20
30-320 0
50-320 0
50-320 0
50-277 0
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEOORY
Ed L Raid It Anociates. Inc
QOQ711O462*
WASTE MOT
Ednon Electric Inititutt
800702O671
PR
B00710OI80*
PR
B007310168
PR
Eilloiii International Co
B00724O434
XPORTLIC
B00731O018
XPORTLIC
8007310303*
FOIA
B007310906*
FOIA
Eichhorn.Eichhorn & LinV
8007020493
BO 070 1 O233*
50-367 0
8007140398*
FOIA
30-3 p
Elijri* Memorial Hoip Elyria.OH
8007100196
REOOD
Energy Producti Group
B00716O497
NUREO
Energy D»p t of
800411OSB3
PR
8007010013
ORO
8007010017*
ORO
8007020635
PR
B007O2O693*
30-281 H
B00703DOB4
PR
B00709009B
PR
8007090103*
PR
B00710O024
PR
8007100094
PR
8007110451
PRM
8007140190*
50-247 P
B0071 30074*
BECY
B007 170091*
30-206 H
B00717O390
50-344 P
B0071B0464*
90-339 H
80Q722O030*
50-966 H
8007240090
71-9607
BQ07840Q94*
71-3607
BOO7B4O134
71-9132
0007280140*
30-889 0
B007300234
PR
8007300411
PR
EncrguiDipt of. Clinch Rtver Breadtr
BOO70 1 0366
90-537 F
Reactor Plant
B007030179
PR
BOO7080264
50-937 B
B007100194
30-937 F
Energy. Dept of, Idaho Operation* Office
B007290174
RES
Engineering D»cltton Analyjtn Company j
8007B20383»
SO-70 P
Inc
8007S203960
30-70 P
8007220362"
30-70 P
8007220366*
50-70 P
6007220369*
50-70 P
8007280606*
TOPREP
Environmental Coalition on Nuclear Power
8007070275
30-320 0
8007080086
90-320 0
Environmental Policy Institute
8007030107
PR
Environmental Protection Agency
8007020400
PR
80O71I0026
PR
8007230594
50-409 D
B007290600
40-1162
80072B0037
PR
B007S90696
90-10 D
Eiie* Corp,
BQ07090163
NUREO
8007090166*
NUREO
B007090167*
NUREO
Euratcm Supply Agency (Belgium^
B007 130036
XPORTLIC
European Communi t lei, Comtninlon of
8007 170229
XPDRTLIC
0007240447
XPORTLIC
Enon Klnvrati Co i USA
80071 7067V
40-9102
80072B0047
40-8102
Enon Nuclear Co . Inc dub* of Exxon
7909210176
REOOD
•Corp )
8007020701
PR
8007070004
XPORTLIC
8007070006*
XPORTLIC
B00707000S*
XPORTLIC
BO 07070402
PR
8007110215
TDPHEP
B0071 10341
TOPREP
8007160306
71-65B1
3007240234
XPORTLIC
8007240B47*
XPORTLIC
BO 07200007
PR
8007290733
TOPREP
Farm Legal - TN
8007140691
PR
Federal American Partn«r»
BO 070200 13
40-4492
8007100084
40-4492
8007100087
40-4492
8007210169
40-4492
CORPORATE SOURCE INDEX
471
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEGORY
Fedsral Emergtncg M»n»s»mtnt Agency
8007090023*
SECY
00071 40079*
10CFR
8007240060
50-369
F
Federal Energy Regulatory Commission
9007100218
50-10
D
Firm Corp
0007090393
REQQD
Fitchburg Gas & Electric Light Co
80070B0019*
50-443
I
Flciich*k*r. D S
8007100198
50-275
0
8007230305
30-275
0
8007300096
30-275
0
Florida Cl tin
8007090051
50-369
M
B00723079B
30-369
M
Florida Pouier & Light Co
B0070104B3
30-335
S
B0070 10491"
50-339
S
B007020296
PR
6007020321*
50-335
0
8007030321
50-335
P
B007070100*
30-333
0
B0070BO 1 40
50-250
P
8007080284
50-335
8
8007080290*
30-335
S
8007080330
50-335
R
B0070S0335*
50-339
R
8007090286
50-335
P
8007100021
50-335
0
8007100023
50-230
0
8007100129
50-330
Q
B0071 10199
50-230
P
B0071 10199
30-230
P
B0071 10236
30-290
P
B0071 10261
30-230
P
B0071 10261
30-250
P
B007 140364
50-335
8
8007140372*
90-333
8
8007140382
50-335
S
8007 1 40389*
50-335
S
B0071 90532
50-335
S
B007I 30534*
50-335
S
B0071 90627
30-335
B
B0071 50636*
50-335
S
80071 6037 S
30-250
Q
8007160599
50-3B9
B
B007160B1Q*
50-335
0
B007210060
50-389
0
BOD7210064
50-250
0
BQ07210064
30-230
a
8007220069"
50-335
Q
B007220374
50-333
P
B007220377
50-335
Q
B007220380
50-2SO
P
9007220419
30-290
S
BOO 7220421*
50-250
a
8007220943
30-250
R
8007220543
50-230
R
8007220550"
30-250
a
8007220550*
30-250
R
B0072301B1
PR
B00723044B
50-250
F
B007230442
30-230
F
8007230454
50-250
F
B007230454
50-230
F
B007230799
50-389
M
8007240075
90-250
R
8007240073
30-2SO
R
8007240036*
30-230
R
8007240086*
50-230
R
8007240174
50-250
R
B007240174
50-250
R
8007240177*
50-250
R
BQ07240177*
50-230
R
B007240263*
30-B30
a
8007250272
50-335
a
3007250283
50-250
Q
3007230232
30-250
Q
8007250312
50-333
Q
8007230931
50-250
P
8007280931
50-850
P
S0072B0562
90-250
P
80072B0562
50-2SO
P
8007260647
90-335
F
80072906B4
50-335
F
B007300B5B
30-290
Q
B007300558
30-250
0
3007310094
30-230
Q
8007310094
30-250
Q
8007310230*
50-3B9
Q
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEGORY
Florida POJBT Corp
6007010355
50-303
p
B007O10463
50-303
S
B0070203B7
30-303
p
6007030242
50-30 3
p
8007070327
30-303
Q
90070B0075
50-303
P
9007080239
50-302
F
80071QQ1O1
REGOD
B007S00153
50-302
P
8007110132
50-303
P
9007110402
50-303
S
a00711041O»
30-302
S
B0071E03B3
50-302
p
B0071504B4
50-303
p
B0071S0503*
50-302
Q
Q00715059B
50-302
0
00071 5070B
50-3 D3
R
B007 150713*
30-303
R
B007 180294
50-303
P
8007 180313
50-303
P
8007150394
30-302
P
3007160340
30-302
0
8007210203
30-303
P
80072S03B3
50-302
P
8007230 1<53
PR
B007230562
30-303
Q
B007B30573*
50-302
Q
B0072 40074
50-303
P
800.7240382
50-302
Q
8007250326
30-302
P
fl007250330»
30-302
P
6007280137
50-302
P
B007280133*
90-303
P
8007280373
50-303
F
Fluor Power Service. Inc
80072 20334*
50-309
P
Foster Uheeler Corp
8007290858
PR
Foundation Sciences. Inc
800717056B*
30-344
R
Fni Induitrl ti
8007010236
TOP HEP
Frankhauieri D D
80072 30569
50-35B
0
Franklin Initl tuti/Frank 1 In Restarth
8007070368
50-338
P
Cnntir
8007310265*
FOIA
Fri«nd» of the Earth
8007110506
50-320
P
B007140034*
8007 1 5Qi 19
50-361
PR
0
Gambia
8007310028
XPQRTLIC
QaiiBF AltaclateirP A
8007190193*
CONTRACT
Oaston Countyr fJG
8007140461
50-269
a
9007140473*
50-269
0
8007140498*
50-269
a
Central Atomic Co (subt of Gulf Oil
B007O202O5
PR
CD )
8007100044
PR
General Atomic Co (subs of Oulf Oil
8007020084
XPORTLIC
Corp )
General Electric Co
Q006 1 909 1 &
71-9139
8007O10090*
50-397
A
B007O10092»
50-397
A
8007010095*
90-397
A
B00701009B*
50-397
A
B0070I034?
TOPREP
9007010507
TOPREP
S007010595
71-39BO-
6007010593*
71-59BO
8007010600*
71-5980
BQ070106O2"
71-5960
8007O 10603*
71-5980
8007010605»
71-5980
80070206-1 1"
70-1308
B007O30231:*
70-1113
80070700fa7
PR
0007070349
OEM TEC
IS
Boo7oaoaia
70-1113
8007090310
TOPREP
B007100135
REG61)
6007100191*
PR
B0071104901
5ECY
8007110503*
SECY
800714003B
70- 1 308
fl00714006B.
tOCffi
B007 140356
TOPBEP
B007 140426
TOP REP
BOO7140430*
30-331
p
8007140946*
SEC If
8007150031*
70- ma
472
CORPORATE SOURCE INDEX
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATECORY
B007 150033*
8007150104
Q0071 50407
0007150724
8007160360
70-1113
PR
RES
TOPREP
50-70 P
8007160703*
80071*0709*
8007170574*
80071 BO 1 23*
B0071B0460
30-341 A
50-341 A
30-260 P
90-277 P
71-9136
80071 B0470*
B0072 10366
B 0073201 33
B007320147
8007220168
71-9136
TOPfiEP
70-1308
70-1308
70-I30B
3007220170
600722033?
B00722Q349
B007250513
00072 50SB7*
70-1308
TOPREP
50-70 P
TOPREP
QA999
8007280058
8007280131
B0072B0407
B007200577
B0072B0599
71-170
XPCRTLIC
XPORTLIC
50-70 P
TOPREP
General Electric Co . Nuclear Energy
Product* Div
B0072BQ637
9007310043
8007310044
80073 10270*
B0073 10391
30-70 P
XPORTLIC
XPORTLIC
FOIA
NUREO
General Hotara Carp
Central Public Utllltit* - CPU Service
COTp
aoo7aaoo77
8007310066
6007230340
B0072B0366*
B007030334
71-4996
XPQRTUC
XPORTLIC
XPORTLIC
30-330 T
Oeo-Center ii Inc
Georgia Fouler Co
B007 130730
B007 160670
8007240367
800716049Q"
8007010474
50-3SQ I
SO-2B9 P
PR
CONTRACT
50-321 P
8007010494
B007010303*
B007010510
BQ0701051H*
B0070202I8
50-364 8
90-366 S
90-366 S
50-366 8
50-424 0
B0070B034S
80070205SQ
B007020S23*
B0070206S8
3007020439
Pfi
50-366 8
50-366 8
SO-321 P
30-321 P
3007020633
80070206420
8007030261
8007030261
BOQ7030272
90-321 S
30-321 8
30-321 8
50-321 8
90-366 9
B007030274*
8007030276
B007030277
B00703027S*
3007030279*
30-366 S
50-321 S
50-366 a
50-321 3
50-366 S
8007030280
B007030283*
BQ070302B4
6007030286*
BQ070B02B7
50-366 S
50-366 S
50-321 8
50-321 S
50-321 P
B0070B02a?
BOQ70B0322
BQ07QB0327*
B007080344
8007090074
90-32 1 P
50-331 P
50-321 P
90-424 H
90-321 0
8007090339
9007090339
3007110239*
8007110263
B0071 10304
50-321 Q
SO-321 Q
30-321 Q
30-321 8
50-321 S
8007110307
6007110313*
B007110366
8007 1 1036B
8007110400
80-321 8
50-321 S
50-366 8
50-321 8
30-321 S
8007110403.
8007110413
B007110426*
50-321 S
50-321 S
30-321 3
AUTHOR ACCESSION
AFFILIATION NUMBER
SUBJECT
CATEOORY
8007110429
30-366
6
6007 11 0432
50-331
S
e007110437»
30-366
B
8007110442»
50-321
8
B0071 10455
50-321
6
5007110463*
50-321
8
8007110321*
50-424
Q
8007140337
NUREO
80071403B4
30-321
Q
S007150133
PR
6007150496
30-321
8
B0071503QB*
SO-321
8
8007130939
50-321
8
80071 50544»
30-321
S
B0071 50638
50-366
S
B007150642*
50-366
8
8007150666
30-321
8
0007130674*
30-331
S
6007150678
50-366
8
80Q71S06B3*
50-366
S
0007170362
50-321
B
B0071703B7»
50-321
a
0007170392
50-321
8
0007170403
50-366
8
B00717040B*
30-331
8
8007 170410*
50-366
3
B007170414
SO-321
S
8007170419*
50-321
8
0007170431
50-321
8
0007170433
30-366
8
0007170463*
50-321
B
Q00717046B*
50-366
8
eOD717<MHl
SQ-3S1
&
8007170497*
50-321
B
0007210370
30-321
B
0007210371*
50-321
6
0007210384
30-321
B
80072103B4
30-321
B
0007210393
SO- 366
S
0007310397*
30-366
B
B0072104S4
30-321
B
8007210492*
90-321
8
00072B0273
50-424
Q
8007220281
50-321
Q
8007220281
50-321
a
8007220422
50-321
Q
8007220S14
30-321
8
8007220919*
50-321
8
6007240184
30-366
e
6007240 12B*
30-366
B
8007240165
50-366
B
8007240167*
50-366
B
8007240264*
50-331
a
0007230292
50-321
Q
8007250292
90-321
Q
000733041 1
50-366
B
00072S04ia«
30-366
8
0007260128*
30-321
a
0007290443
30-321
8
B0072S0446*
30-321
8
80072B044B
30-321
8
00072B0449*
50-321
8
80072B0430
90-366
8
80072B04S3*
50-366
8
00072B0305
80-366
S
0007280312*
50-366
8
8007390914
30-321
F
000728051B
50-366
S
8007380326.*
50-366
B
00072S033B
30-321
Q
0007280541
30-331
a
8007280341
30-321
a
000738037B
30-32 1
8
80072903BB*
30-321
8
80072B0629
30-321
8
80072B0634
30-321
P
0007280634
30-321
P
8007230640*
30-32 1
8
00072S0642*
30-321
P
8007260642*
50-321
P
Q0072B067B
30-321
R
80072B0676
30-321
R
00072S06BO*
30-321
R
8007380683
50-321
B
00072B06B6*
30-321
R
CORPORATE SOURCE INDEX
473
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEGORY
8007230666*
B0072B0690*
BOO7 2S0692*
B007280692»
80072906 IB
30-321 R
30-321 8
80-321 R
50-321 R
50-321 Q
8007290618
8007270774
B0072?0774
8007290777*
B0072f0777»
50-321 Q
50-424 F
30-424 F
50-424 F
50-424 F
8007300392
B007300513«
Q00731027S
8007310375
B0073 10287*
50-321 S
30-32 1 5
50-331 Q
30-321 Q
50-321 Q
Otorgiii St*tt of
Qeorgi^i Unlv of.
B007310297»
8007310527
8007310537
8007190068
B007 100349
50-321 Q
30-321 Q
50-321 Q
PR
71-389
Oirminui Federal Republic of
Cibbi t HIlli Inc (subs of Dravo Corp )
01 Ibirt/Commonujfa 1 th Coi
8007100353*
80070E0554*
&0073102S5
8007210527*
B007070106
71-389
50-320 Q
NUREO
50-445 A
TOPREP
Doldbtrg. Fitldmin b Hjtlmfelt
Ooldtr Anoclatti
Ooldimlth, R
B00722038B"
B007I40B75
8007230362*
B0072B0717*
B007 140337
30-302 P
30-346 M
CONTRACT
CONTRACT
50-10 Q
Onuld-Hroion Boverl
Or»enpt»c« Foundation
Oulf & Ueittrn Induitrtei. Ini
Oulf Nuclear. Inc
B007080191
8007020127
B007010142*
8007010151*
B007140983
B007020123
B007030190
8007020139*
8007160493
S0072I0148*
50-354 A
FDIA
OA999
QA999
PR
WASTE MOT
PR
WASTE HOT
NUREO
50-458 Q
Co
Oulf Scienca & Technology Co
Oulf Statu Utllltlei CD
HEWiDtpt ofi Food & Drug Administration
HH3, Dtp* ofj U3 Public Health Service
8007220394
8007290424
9007110339*
BOO 7070264
6007140640
30-458 0
PR
CONTRACT
50-10 D
PR
htanford Engin*iring Development
Labor*torij
80071SOOB4
B007 140646
8007140649*
6007I40634*
8007140658*
PR
71-63B7
71-6387
71-63B7
71-6397
8007140662*
8007140666*
8007140668*
8007140673*
8007140678*
71-6387
71-6387
71-63B7
71-6387
71-63B7
Harding-Lauion Associates
S0071406B7*
8007140690*
B007250440
8007230444*
8007280236*
71-63B7
71-63B7
PROJ
PROJ
CONTRACT
Harriibura Hoip Harrisburg. PA
Health Phuiicn Eoclitij
High Rock L«l» Alio«i«tion
Hill Christopher t, Phillips
80D3190626
8007 100001
B006200066
0006200071*
B00703004S
30-320 P
Pfi
50-488 S
3O-4BB 0
50-275 0
Hirjit* V*lve Industry Co . Ltd , Kaiuaifcl
Div
Hittffljin Nuclear 8. DvvBlopmant Corp
dub* HIttman Corp )
80073001 1Q
8007310389
8007290477*
B007290487*
B007I702B6*
30-275 0
30-312 Q
QA999
QA999
30-219 0
House of Rep
8007020088*
8007020217*
8007020237*
8007110343*
8007110449
50-10 U
50-334 H
50-330 H
30-352 U
50-313 H
BOO? 160634
B0071B0427*
B0072 10390
B007240406
B0072S0215*
50-329 H
COMMISSION
50-397 U
30-320 H
COMMISSION
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEGORY
BQ072SQIB9
PRM
S00728053&*
30-329 H
B0073O0367
30-397 U
B0073 10375
50-299 H
House of Rep , Foreign Affairs
&007H50284*
50-273 H
House of Rep , Government Operations
G007250246*
50-544 U
House of Rep , Interior !. Insular Affairs
ac-O42B0239
50-352 U
B 00702 02 79*
WASTE MOT
S 007 11 0509
PRh
aoo7iso43i»
CDMKISSICN
G0072305&3*
30-330 U
House of Rep i Intent !• Foreign
•&OQ71 10278*
COHKIBBIDN
Commerce
BOO 730 0365
50-49B U
Hauims fr Urban Development, Dept of
BQ07220031
40-S749
Houiton Lighting t Pouer Co
BO07O 1 0073
50-49B 0
BQ070H0471
30-466 Q
&OQ70BOiia
HO-49Q B
BQQ70EO&78*
50-49B A
BQ0702067B*
30-498 A
0007070306
30-49S B
8007080013*
30-466 0
SQO70H0017*
30-466 0
a 007080058
30-466 C
800709018?
90-466 0
6007090244.
30-479 Q
6007090246
50-470 Q
8007090365
SO-47B B
6007090365
50-49B S
6007100*33
50-47B <3
6007100443
30-493 S
6007100443
30-4^3 S
BOW U 033?
30-499 8
B007 110337
30-49B S
B 0071 50075"
30-493 0
S0071 50423
5Q--M5 M
8OO7 1 50123
50-445 M
8007150425
50-445 M
6007190649
50-4-93 5
B00719O443
30-498 8
S007140SI9
30-<19a S
8007 1602 1 7
30-498 B
3007160970
50-466 0
B007140604
50-496 S
6007160604
30-49B B
H007tfiD409*
90-49 B B
8007160607*
50-493 S
80071iOa3?
50-466 0
3007160645
50-1 A i 0
8007170203
30-493 Q
8007180432
30-46 i G
3007210511
30-499 3
8007210911
30-49B S
8007220378
SO-49B 0
ao 0722097 a
30-49 B Q
3007230476
30-49 B 8
8007230476
30-49& 8
8007230812
30-49B B
8007230912
SO-498 8
8007230835
30-498 8
8007230940
30-49B S
SO 072309 40
30-49B S
80 0723071 B
30-49S 0
80 0723071 a
90-493 0.
BO 072304 24
90-166 0
8007250441
30-443 N
BOQ7290QB2
30-466 G
80Q73Q0090
30-498 Q
B007300Q7Q
30-498 0
0007300343
30-464 H
8007300348
30-466 H
8007300318
30-4AA H
8007300375
30-49S A
S007300373
30-498 A
B0073Q0392
50-496 8
0007300402
30-464 0
B007300413
30-466 0
B00730Q433
BO-46A 0
BOQ73Q0449
50-466 0
B0073IQG94
30-466 Q
B007310309
30-466 O
8007250264* 50-3 1 7 H
Upward Univ
Hud toil Light (• Power Oept
Huicoi I tic
Hunton fc IJilliam*
474
CORPORATE SOURCE INDEX
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEGORY
Hydrology Assoc lates. Inc
BO 070 90 3 06
B0071703B4
8007350446
B007240029"
9007240041*
50-322 Q
30-332 C
MISC
40-6453
40-B433
IRT Corp
iitaho National Engineering Laboratory
800724004B"
8007160490
800724QH57
B0073B06B3
B007290217
40-8432
CONTRACT
RES
NUHEO
30-254 P
Illinois Power Co
B007030215
B007030215
B0071 10333*
B007 1606S6
90071 6063B*
50-461 Q
90-461 0
50-461 Q
30-461 G
30-461 B
9007160651*
8007160665"
8007160679"
8007210521"
8007330318
30-461 B
30-461 S
50-461 S
50-461 0
50-461 S
Illinois Safe Energy Alliance
8007350359
8007290506
B007300429
9007140337
9007330324
50-461 A
50-461 3
30-461 S
50-10 0
30-10 D
Illinois, State of
8007070023
90070H0026
8007140432
8007140439"
8007140449*
50-314 D
30-367 G
PR
PR
PR
6007140521*
B0071B0056
B0071605B7
B0071B03B7
B007S30S37
CONTRACT
30-367 Q
70-1308
70-1308
27-39
Inberg-Ml Her Engineering Co
Indiana >r Michigan ElectrU Co
9007230442
8007310133
8007290321
8007310494
B0070a0245
37-39
27-39
40-279
40-299
30-315 Q
8007030591
B007030206
B0070902B9
90 07090 E 9 2*
8007U0465
50-313 P
50-313 Q
30-316 8
50-316 S
80-315 0
8007150SB6
9007150397*
9007150623*
8007150664
8007130695.
50-315 S
30-315 S
50-313 S
SO-316 S
50-316 S
S007 1 30696
B007 130703*
6007 160384
B007 160324
6007210537
30-315 8
50-313 8
30-313 Q
30-315 0
50-316 8
8007310541*
6007320000
800723QOBO
8007530269
9007230369
50-316 8
50-313 0
50-313 Q
30-313 Q
50-313 Q
8007230016
B0072S0493
B0072B0510
B007300232
B0073 10284"
30-316 Q
50-313 P
30-313 S
50-313 Q
30-313 Q
Indiana 1 Michigan Power Co
B007310399
8007150543
8007130347"
8007150353
8007150361*
50-313 V
30-313 R
30-313 R
30-316 R
30-316 R
Indiana State Univ
Indiana, State Of
Iniide DOE, rkOr«ui-HiU Publication
Institute for Ensrjy t. Environmental
Research Heidelberg, u Germany
Interei Corp
80073500HB*
8007030300
8007170H03
80071S0043
8007310417*
COMMISSION
PR
FOIA
30-330 P
30-377 R
Interior, Dept of
Interior. n«pfc of, Bureau of Mines
Interiori Dept of. Fi(h t. Wildlife Service
B007140016
B007 160311
B0071000B3
6007020033
8007150710
30-275 H
30-397 A
PR
70-2909
30-230 P
Interior. Dept of, Oaolojical Survey
8007210368
B007'310377
B004B80218
8007030193
50-350 P
50-250 P
PR
PR
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEGORY
S007 140002
PR
8007160692
50-274
F
B007 160698*
50-274
F
6007230142
50-289
0
8007230164*
30-289
a
8007290034
PR
8007310397
30-273
A
International Atomic Entrgij Agency
8007O30674"
COMMISSION
(Austria)
B007300007*
ano
International Structural Engineer** Inc
BOO73005B7*
30-390
A
louia Electric Light It Poiuer Co
B007010433
30-331
P
8007030719
3O-331
Q
B007030212
50-331
3
8007030217*
30-331
3
0007030224
30-331
S
B007030233"
30-331
S
0007030333
3O-331
8
8007030241*
30-331
8
8007O70142
30-331
P
8007070233
30-331
P
8007070233*
30-331
P
8007070272
30-331
a
8007110411
50-331
8
B0071 10419*
30-331
8
B007110471
30-331
B
S0071104B2*
30-331
S
8007140366
80-331
P
8007H0434
30-331
P
80071 4Q442*
50-33 1
P
8007160239
50-331
a
8007160634
80-331
p
8007170363
30-331
a
S007220367
30-331
R
8007220371*
30-331
R
8007220394
30-331
P
8007220494
30-331
0
8007220497
30-331
S
8007220544
30-331
Q
S0072BOS99
30-331
B
8007230233
30-331
P
8007230464
30-331
B
B007B30482
50-331
P
B007250673
50-331
a
8007250677
80-331
a
8007200377
30-331
p
B0072B04BO
30-331
p
Ith*mi Lincoln d Beale
6007020462
30-399
9
B0070SQ349
PR
B0070B0360*
PR
8007090043
30-329
0
B007O90316
30-S33
0
8007140030
80-339
0
B0071500S2
30-1S3
0
8007 ISO 431
30-443
M
8007160393
PR
8007210446
30-233
0
8007220174
30-329
0
8007E30310
30-H33
0
8007300362
30-293
0
8007300368
80-135
P
8.007300431
30-339
0
8007300464
30-158
0
S00730046B
50-195
0
Island Cloieup Meui Service
8007140314
FOIA
Iiotope Product* Liboratorlei
8007020383
XPORfLIC
Iiaak Walton League of Amtrica, Porter
80070B0033
80-367
0
Cauntg Chapter
Jack R Benjamin & Atiociateii Inc
8007220372*
50-70
p
Japan
B007SS0333
XPDRTL.IC
Jersey Central Pouer t. Light Co
8007010468
30-319
p
8007020377
50-219
Q
8007030216
30-219
P
B007070113
90-219
P
8007070259
80-219
S
B007070263*
50-219
S
8007090239
30-219
a
B007090263
30-211?
F
8007110023*
70-1333
8007110370
50-219
s
8007110373»
30-219
B
8007110375
30-219
s
B0071103B3"
30-219
B
8007130703
80-319
R
8007160900
30-219
P
CORPORATE SOURCE INDEX
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEOQRV
6007170279
5O-219
P
G007190409
5O-219
P
B0071BOA15"
SO-219
P
B0071B0423*
30-219
P
B007 100451*
50-219
O
8007180589
SO-219
0
B007210042
5O-219
Q
8007220363
50-319
R
B007220364*
50-319
R
8007230570
SO-219
S
8007230571*
50-219
S
H00725017O
5O-219
0
B007S50305
50-219
0
90072901B4
50-2 If
p
Joniti Broiun & Clifford
8007300340
50-133
c
Joneii 0r*g & Bjijleij
8007H002&
50-273
G
Just let, Dipt of
B007 160347
5O-445
M
B007170364
SO-445
H
80072B0636*
50-445
M
B00730041S
5O-445
M
KKC, Inc
S007 110353
PR
KH3 Fuiion, Inc Iiubi of KMB Influttrte
80O70H0346
XPORTLIC
i. Inc )
Kim n Sciincn Carp
B007U0513.
CONTRACT
Kin >i <J»t & Eltctrlc Co
8007290017*
50-482
O
Kin •!> Unlv of
SOO7170317*
90-482
A
Kiu ckl Birglco Induitrlei, Inc
aoo7oaoi53
XPORTLIC
K»r -HcOee Chemical Corp (subs aS
BOO7020667
PR
Ke i — McOe« Corp 1
80O71402B6
FOIA
8007210108
40-2061
H0073 10262
FOIA
Kirr-Kcfi** Carp
BOO? li 0025
40-S06I
80O7110027*
40-2061
BOO7170491
PR
Ktrr-McOci Nuclear Corp
80O701059O
40-B647
B007010S92*
40-BM7
8007010609
40-8027
8007010611*
40-0027
80070 106 IS*
40-6027
8007030031
40-0647
8007030035*
40-8647
B007230564*
70-925
B007250634
40-80H7
Lancnttr Countij, PA
8007200116*
30-320
H
L«oi
B00711001O
XPORTLIC
L*p p. Inc
B007 160221*
COMMISSION
L*ul»ri Matuikg ti Bfcsllij Englneen
B0071 70403"
0007330033*
30-220
MTEC
P
Liiurtnct Livermore L*boratori|
B007140617
NUHEO
BOO718007K
NUREO
80O7SS0024
HUREG
8007220034
NUREO
B007a4047S
NUREO
LtBoiuf, Lamb, Litbu ii HicRae
00O702031E
PR
B007 100437
PRM
B00714037O
90-453
Q
B007 140370
50-493
0
00071 4037B*
30-432
&
B007140378*
5O-453
0
8007140619
30-320
H
6007170393
3O-320
P
8007300033
PR
Liagui oF Women Voter* of San Luti
60070 104 57
50-273
H
ObiipDi CA
Lthlgh Unlv
B007 140642
RES
BOO? 1704 60
RES
8007310019
30-219
P
Latter B Knight h Atiociatei, Inc
8007290036*
MISC
Lavg> Outm'nj Goldberg I Kaplan
B007070Q92
PR
Lif* Cycle Engineering. Inc
8007170935*
80-320
P
Lockheed Environmental Science*
80O70 10226*
50-2O6
R
80O710026B*
50-2O6
R
Long Itland Lighting CD
80070 10066
50-316
Q
BOO7020073*
50-322
S
80O7030053
5O-323
Q
B007090243
50-322
K
8007090345*
30-323
K
8007090306
30-322
a
B007 140390
50-322
B
80071B0653
30-322
f,
8007160B67*
30-322
Q
B0071703B4
50-332
0
B00721004O*
30-332
Q
80O7210515
50-516
Q
AUTHOR
AFF1L1ATIGN
ACCESSION
NUMBER
SUBJECT
CATEGORY
8O0723<H5B
50-323
A
8Q0723O462B
30-332
A
aoo7S3O59B
50-322
K
8007250568
50-332
A
aoo729O689
MURE-0
Los Manas Scientific Laboratory
B00710O053
RECCD
80Q716O'JO5
PR
aoo7iBoi75
REOO&
aQ07iBO&03
ACRE
B00721O607
REE
Los Alamos Technical Aisot i ate Si Inc
e0072SQ209a
FOIA
Los Angeleii CA
GO0714O05HI
PR
Louisiana Fouer !• Light Co
SO07O1O319
50-3S2
5
8007010311
so-3aa
F
\
S00701O343*
30-332
F
B007020397
30-392
9
B00702O40S*
3C-392
a
B0070B0179
SO- 3 92
A
B0070C0234
50-392
a
BO07oaoa39«
5O-3BS
B
BQ07100163
50-3B2
V,
BO071QO166*
SO-3B2
K
8007100169*
50-302
K
GQ0710O429
SO-3H2
Q
B007150417
50-3B2
(1
8007160586
30-3B2
K
8007160616
50-302
K
eoo7Sao373
50- 3 0S
F
8007230399
50-302
F
8007290439*
SO-3B2
a
9O073 00395*
50-382
n
•Lnueniteiiii Newman i ReiaiAielrad t< To 11
80070 H036H
PR
S007OE04B4
PR
H0070E0453
90-3i7
G
8007020471
50-H6A
Q
8007020604
50-376
0
8007030082
PH
80070301(9
PR
80070 B 00 17*
50-466
a
8007000031
50-3-67
a
9QQ70HOOSa
30-466
a
SQ0709O1B9
50-446
0
8O071QO160
PR
8007 1001 BO*
PR
8O07 150425
50-445
H
8007150425
50-445
M
BO0714O370
50-466
0
BQ07 160639
50-466
0
BO0716O615
90-466
0
8007130433
50-466
0
3007230335
50-376
0
8007E 5Q4H4
BO-466
a
8007290441
50-445
N'
B007S900B2
50-466
Q
3007300027
PR
8007300090
S-0-4.9B
0'
9007300413
80-466
0
8O073Q04-19
30-466
0
9007310094
BO-466
a
9007310306
50-4S.6
a
Loiuer All Quay's Creek. KJ
9007110112
50-273
s
MagnaPlui Corp (subs of Fed body Gallon
8O07020044
71-3
Corp )
BOO 7 02004 7*
71-5
Maine Put 1 ic Service Co
eoo7oaooas»
50-443
i
Maine Yankee Atorait Power Co
SO0701033?
50-309
s
8007030325
30-309
p
Q0070Q0217
S 0-309
I
B0070B0413
50-309
B
BO070S0417*
&0-309
S
BOO709O29S
30-309
P,
80071 I03B-&
30-309
fl
B0071103&9*
50-309
fi
B0071i)0403
50-309
0
B00717O321
50-309
Q
eoo7iaoo9o
30-309
Q
8007BI03i.7
SO-309
R
S0072l03fi9*
30-309
R
3007210-425
30-309
S
8007210431*
50-309
G
3007210401
50-309
0
•B0072S0404
30-309
P
flC072S0405.
30-309
P
£1007280 4 5B
30-309
Q
8007360604
90-309
R
476
CORPORATE SOURCE INDEX
AUTHOR
AFFILIATION
ACCESBIGfJ
NUMDER
BUDJECT
CATEGORY
Maine, State of
Malllnckrodt, Inc
Manchester Memorial Husp Manche E ter. CT
Map leton Intsrvenon
B0071104B1
8007110934
B00715031B"
S007140017
50-309 R
30-309 H
PR
70-2651
90-329 Q
Marine Biological Consultants, Inc •
Mark IV Industries, NRD Div
MarquettB Univ
B007 160649*
B0071002&B*
8007110159
8007240259*
50-339 H
50-S06 R
50-206 n
FOIA
40-4337
Marrack, 0
B0072SOOI2*
B007030025
8007030029*
80071 10080
B0071 60560
40-4337
50-466 0
50-466 0
50-466 0
SO-466 0
Marsh & McLennan, Inc . M & H Nu clear
Consulta-its, Inc Div
B007 160S6S*
6007230553
B007010516
8007010523
9007060261
50-466 C
50-466 Q
50-299 J
90-272 J
50-364 J
6007150479
6007 150490
B007160413
8007310342
8007310342
50-155 J
50-360 J
PR
30-272 J
50-272 J
60O73 10376
B0073 10376
8007310435
8007310436
6007310436
50-272 J
90-272 J
90-302 J
50-259 J
50-259 J
Marubeni America Corp iiubs of Marubeni
Corp )
Maryland' State of
Maryland, Univ of
B007290460
B007H90467*
800702033S*
80070700B5
8007230495
XPORTLIC
XPORTLIC
State Prog
PR
SO-166 R
Massachusetts Institute of Technology
Maisachusetti Kunitipal Uholesale Co
Massachusetts. State of
B007 100030
8007210258*
B0070B0037*
8007030363
8007160851*
PR
CQMTRACT
50-443 I
PR
COMMISSION
Maisachuietts, Univ of
Matheson Cas Products
Mayer. Brouin t Platt
B007 100079
B0073100B2
B00702060S
8007140038
8007220136
PD
XPORTLIC
70-1306
70-130B
70-1308
McDermott' Hi 1 1 & Emery
B007220I47
800722016B
SQ07220170
8007230519
B00717038B
70-130B
70-1308
70-1308
70-1308
90-445 M
HeOean Chemical Co , Inc
McGraw-Hill Publications Co
McPhillip*. J L
H«H-Phg<lci, Inc
8007260370
9007020731*
B0071I0003
B00711009S
B00707017B
FOIA
CONTRACT
70-2909
70-3909
PH
H»dinael»ctPlc Coojeva t ivei I nc
Himorlal Hotp of Natrpna Countu,
S0071703B8
8007100129
50-449 M
REGQD
Himphls State Univ
Metal Btllout Corp
8007280386
B0070 10572
SOQ7110538
50-33B F
XPORTLIC
XPORTLIC
Metropolitan Edison Co
8007010155
8007010326
60070 1038B
6007010388
8007010454
50-3B9 Q
30-289 P
30-289 F
50-269 F
50-320 8
80070 104 93*
B0070 10460
B007010460
80070204B2
50-320 8
50-320 P
50-320 P
50-320 0
Q
0
0
0
AUTHOR ACCESSION
AFFILIATION NUMBER
SUBJECT
CATEQQR1
(
S007070313*
30-2B9
3
0007070320
30-320
P
B0070703EH*
30-320
P
8007070343
80-299
P
8007070343
80-2B9
P
B007Q80074
30-809
P
B0070B0211
30-2B9
B
B00700QE14-
30-289
B
B0070B0244
30-289
F
BQ070B0338
90-320
P
8007080358
90-320
P
9007090373
30-309
0
8007110013*
70-1333
B0071 10020*
70-1333
aoo7uooa3»
70-1333
B0071 10024*
70-1333
0007 11 0030*
90-289
J
B007110035Z*
50-320
J
8007110040*
90-320
J
8007110422
30-330
P
8007110446
90-289
Q
BOQ71 40006
30-320
T
0007140224
90-389
0
8007140346
90-2B9
P
8007140392
80-320
P
B007140363
30-2B9
P
B0071403BI
30-289
a
B0071 40309
30-320
H
B0071403BO
90-320
H
BDQ7140413
30-320
P
B007140419
30-320
P
0007140419
90-320
P
BD07 190497
30-320
P
8007130302*
90-320
P
8007130307
30-320
P
8007130513
30-320
a
B007130S14*
30-320
B
6007 1303 19
30-3KO
B
BQQ7130319*
30-320
5
0007190589
30-289
P
8007130721
30-2B9
0
B007I60431
30-320
Q
B0071 60922
30-320
a
8007160924
30-289
B
0007160323*
30-320
B
8007160326*
90-289
B
9007160594
90-320
a
BOO? 1606 19
90-HB9
a
00071 60623*
30-289
a
B007 160667
30-320
F
B007160667
30-320
F
B00717033B
30-320
P
0007170340*
30-320
P
B007 170373
30-320
P
0007170399
30-320
P
80071 704«
90-320
P
8007170436
90-380
P
B0071B0376
30-320
P
B0071B0391
90-289
0
0007100394
30-289
0
BOD7 180396
30-289
0
BQ07180404
30-320
J
0007180404
30-380
J
B0071B0414
SO-2B7
P
80071 B0421
90-2B9
0
BOQ7210397
30-320
R
0007210372
30-2B9
P
0007210303
90-320
P
000721039B
90-EB9
Q
B00782044E
30-320
P
0007220471
30-209
F
B00722048S
90-380
Q
BOQ72SQ492
SO-2B9
Q
8007220493
71 "9081
B0072205S3
50-320
F
0007220353
30-320
F
8007SE0353*
30-320
F
8007220333*
30-320
F
8007220384
30-320
J
80072203B4
50-3BO
J
8007220992
90-389
Q
0007230434
90-320
8
8007330439
50-320
S
8007230314*
90-389
0
8007230521
50-2B9
0
CORPORATE SOURCE INDEX
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEGORY
6007230604
50-2B9 0
BD07230610
50-289 0
B007B50356
50-2B? 0
6007250401
50-289 Q
600725O504
50-289 0
6007S5O613
50-289 S
e0072BO4B3
50-239 S
800729O617
50-2B9 Q
B00729O799
50-289 R
80072-7OB05*
30-289 R
800727O91 1
50-320 S
B00729OB17*
50-320 S
6007300437
50-389 0
B007300447
50-320 P
6007300449
50-466 0
8007310137
50-289 0
SQ0731O406
50-32O P
B0073IO439
50-320 P
Michigan. State of
B00729O065*
State Prog
MicM9"i, Unlv of
B007020659
PR
80070SO357*
PR
60071 1 0543
OHO
B00716OE80
RES
B007230E23
RES
B0072B033B
CONTRACT
Microtech Indul tries. Inn
B00702039B"
CONTRACT
B00707O134*
CONTRACT
Middle South Services. Inc
S007020406
PR
B00702O413D
PR
80071OO009
PR
8007100335
PRM
Mi dweit Environmental Protection
8007210150
40-1341
Anac latlon
Miller Technical Services
B00730O279
40-299
B007300BB3*
4O-299
B00730028B
40-299
B00730O2B9*
4O-299
Miller. D 8
80070EO607
90-309 0
80070206 10»
50-309 0
S00703O059*
PR
S00711O343
PR
BOO7300122
3O-30? 0
BOO7300127*
9O-309 0
Miner & Miner, Inc
8007110575"
CONTRACT
Ministry of Concern for Public Health
S007020449
PR
Minnesota. State of
800710020S
50-282 0
8007140011
PR
8007B30SB3
PR
SOO72504S2
50-232 0
Minnesota. Univ of. Minneapolis
8007030200
PR
BOO7140014*
PR
Mlsilisippi Power b Light Co
8006190577
50-416 B
BOO6300373
SO-4 1 6 F
8006300332*
50-416 F
B006300384*
90-416 F
80O701O361
90-416 F
B007010361
90-416 F
B007020538
50-416 8
800702053S
50-416 S
8007020539*
30-416 S
8OO702O539*
30-416 B
BOO702Q341»
3O-4 1 6 B
BDO7020341*
5O-4 1 6 3
BOO70a0579
50-416 S
B00702.0601
30-416 8
8007020601
50-416 S
BOO7020603*
50-416 B
80D7O20603*
50-416 S
3007020619
50-416 S
8007020630
50-416 S
8007020630
30-416 B
80O7020632*
50-416 S
B00702063B*
30-416 a
8007020640
5O-4 1 6 S
800702:0640
30-416 S
BOO703024S
5O-416 A
B00707011B
PR
B00707011B
PR
3007070245
50-416 E
8007070245
50-416 E
80O7070298
50-416 8
80O707029B
5O-416 8
BOQ7U0412
50-416 K
B0071 10413
90-416 S
8007U0413
50-416 3
AUFHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEGOfiV
B007110417*
BQ0711O417*
B0071 10430
BQ-07 110430
600711)0395
50-416 S
50-416 B
30-416 S
50-416 B
50-416 E
8007140398
BQ071 40575
BOO7150093
6007150093
6007150099
50-416 E
PR
50-416 3
50-416 S
50-416 3
6007150-099
6007150109
8007150105
6007160385
6007560933
50-416 S
30-416 3
50-416 B
90-416 B
50-416 B
60071606SO
6007160611
BOO7160611
BOO7160617*
6007160619
50-416 A
90-416 S
50-416 B
50-4L6 A
PR
60071 4064S
60071 (,5642
6007160B62-*
60071 4 OB66*
6007170290
50-416 S
60-414 Q
50-416 d
50-416 0
50-416 B
6007170290
6007170294-"
B007170294*
8007170396
8007170396
SO-4S6 3
50-416 S
50-416 3
50-416 9
30-416 S
8007170400*
•0007170400*
B007 170439
0007170439
H007 170392
50-416 B
50-416 B
50-416 3
50-416 3
50-416 B
80071&OS93
B0071B0293
8007E 1 0270
8007820366
6007020389
50-416 F
50-416 P
50-4(6 a
50-416 B
SO-4E6 B
80Q7B2Q969
60072209739
6007250435
6007250310
fiOO7250920»
50-416 A
50-416 A
9Q-416 0
90-416 B
50-416 B
eoo725os20»
3007290494
B007280494
6007230366
6007290655
90-416 B
50-416 A
90-416 fit
50-416 B
50-416 8
60072° 0655
6007270666
6007S90666
8007290671
BOQ7E90671
50-416 a
90-416 9
30-416 a
50-416 S
50-416 B
Mi is isilpp lam Against Disposal
8007290714
BOO7HI7O71'1
BOO7270791
BOO7S90791
B0070P0009
80-416 S
SO -41 6 B
50-416 S
30—116 S
PR
Misfiourii State of
Missouri. Unlv of. Columbia
Missouri. Unlv of, Holla
B007a"?0030»
Q0070SOZ&D
8007080344
90071 '1035 1
Q007S2O12S
30-493 A
90-186 3
90-1B6 S
90-186 S
90-IE3 0
Mitsubishi Intornatlonal Corp (subs of
Mitsubishi Corp )
MiUul t* Ca , Ltd
B007240030
B00724003i»
EJ00731O4B2
Q00710029I
80071002B7*
XPORTtH:
XPdRTLIC
XPORTLIC
XPDRTLIC
XPORTUC
Mobile 8ys terns
Mo-n»atito Ruearch Corp
G0071tO27»
B0071I0263II
Q0071 00349 »
QQ071701A14
8007160394
XPOHTUC
XPORTUC
CONTRACT
CONTRACT
XPORTUC
Montanii State of
Morrison KnuJisn Co . Inc
Mount Sinai Hartford, CT
Municipally Ouined Electric Systems
Association
80071 6039?*
BOO 7 02033 2
BOQ722011?*
BOO 7 23060 l»
E0070301B9*
XPORTUC
PR
HASTE HOT
70-2000
50-413 A
Mutual Atomic En»igij Liability Undermrit
01*1
B007 100134
B0072I0442
PRM
MIBC
478
CORPORATE SOURCE INDEX
AUTHOR
AFFILIrtTIO;!
ACCESSION
nUMtiEFi
SDJ1JECT
CATEGOHY
ML Industries, -TJL Nuclear Div
WPS Indus tr i es. 1 nc
NUS Corp
B0072B031S
B007160Q07
B0071OO309*
B007I00309*
Q007IO0311*
71-9010
30-329 S
50-230 P
50-S30 P
50-230 P
B007100315*
B007100313*
3007100315*
90 071 0032 S*
GO 071 0033 S»
50-280 P
3 0-2 BO P
S 0-2 BO P
50-2 BO P
50-330 P
B007 10033 IB
G0071O03-23-
B007t00323»
Q0071 00323*
B0071 00323*
50-230 P
50-2SO P
50-280 P
50-260 P
50-2BO P
S0071O032?"
0007100329*
B007 100329*
B007 100339*
B007 100335*
50-2BO P
30-aeo P
50-2BO P
so-aeo P
30-2SO P
B00710033ait
B00710033a»
B007 100347"
S007100347*
B007100347*
30-2BO P
3Q-2BO P
50-2HO P
30-280 P
50-280 P
80071O0351*
B0071 00351*
8007100351*
B007100359«
B0071 00359*
30-280 P
30-2BO P
so-aao P
50-280 P
30-sao P
B007100339*
B0071003A5*
B00710D3A5*
B0071003i(,5*
B007 100371*
50-230 P
50-280 P
30-2BO P
50-2BO P
30-280 P
30071 0037 l»
8007100373*
B007 100373*
8007100380*
B0071Q0380*
50-280 P
50-230 P
30-200 P
SO-2BO P
90-200 P
B007100383*
B0071003B2"
B007 100387*
B007I003B7*
B007 100391*
50-280 P
50-2BO P
50-200 P
50-2BO P
50-SBO P
3007100391*
30071 OQ403*
8007100407*
B007I004071
B007100409*
50-280 P
30-280 P
50-28O P
50-2BO P
50-2BO P
8007100409*
30071C-04I4*
0007100414*
3007100415*
8007100415*
50-280 P
so-aao P
50-280 P
50-28O P
so-aeo P
B007H0031*
S007320032*
B0073B0036*
B0072E010H
000722 0111 si
PR
WASTE MOT
WA9TE MOT
WASTE MOT
UASTE MOT
NUSAC, |nc
National Audubon Bacletyt Central Miduest
Regional Of flea
National Campatgn tor Radioactive WaatB
Safety
3007280327*
BOQ714C-63&*
6007170089
(3007220326
8007300323
CONTRACT
FOIA
50-320 P
FOIA
50-10 »
National Council on Kadiatlon Protection
>f Measurement*
National CmploijEe Benefit Assoclatai
National Uilriltfe Federation
Natural fieiourc?* Defence Council
80070701H1
B007O30332
B007190133
BO 07070004
PR
FOIA
RCQQD
PR
PR
70-1-13
V
<?Q27
EO
29B 0
E9B Q
898 8
298 S
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEODWY
B0070B0363
B0070B036B*
BOO 7000391
8007080395*
8007O90005
30-29B B
50-298 8
30-298 H
50-298 R
30-278 8
SOO7O90O07*
8007100O16
8007 1 50702
B007 160440
8007210152
30-299 B
30-290 0
50-E9S B
30-298 P
50-290 0
8007240239*
B0072S0421
8007230423*
8007250301
B0072B04S2
50-290 P
30-290 B
50-290 ft
30-290 9
30-290 P
Neighbor! for the Environment
Neutron Products. Int
BOQ72B0467*
B0072B03B4
B0072B0392*
8007140036
B007230349
50-290 P
30-290 B
50-290 B
PR
71-121
Nevada. State of
Now Bedford Oai b Eifiion Light Co
N&u England Coalition an Nucloar
Pol lu tlon
N«u England Pou*r Co
BD07230334*
8007230739*
B007080O22*
8007110049
80070BOO14*
71-121
COMMISSION
30-443 t
PR
50-443 I
Neu Hanpthirci State of
New Jersey/ State of
Neu Meiico, State of
B0071B0467*
8007100175
B007100178*
8007290035*
B007030043
MISC
30-272 0
30-272 0
30-2B9 H
PR
New York Federation for Safe Energy
NEUI York, State Unlv of- Buffalo
8007210133*
B007O1050B
B007030204
8007030209*
B0072B0654
CONTRACT
50-320 H
PR
PR
30-37 Fl
Net" York, Statt of
B007290694
B0071 10121
8007 150067
8007170277*
80071B0047*
50-37 fi
PR
PR
State Prog
50-322 H
Newport NBUI Industrial Corp dub* of
Nauiport Neui Shipbuilding & DrgDack Co
Niagara MohauV Power Corp
B0071B0217*
B0073 10267*
80070B0230
B0070700B9
8007070261
State Prog
CONTRACT
MIBC
30-220 0
50-220 P
B007OB0337
8007150122
8007170360
8007170361*
8007170394*
50-410 A
PR
30-220 R
30-220 B
30-220 P
8007 1 70397*
8007180073
8007210100
B007S30192
8007350472
30-220 P
30-220 0
30-220 0
30-820 Q
30-410 A
8007290273
B007280273
80072 804 A 5
80Q72B0340
8007290586
30-S20 I
50-220 t
50-220 0
30-220 H
50-220 S
Ni»iho-Iiu«f American Corp
North Anna Environmental Coalition
8007290AOO*
8007300049
8007280464
8007O70073*
8007070079*
30-22O B
PR
XPdRTt-IC
30-280 H
30-280 H
North Carolina Electric Membership Corp
North Da io Si. Stats of
Novthcufct Ely
Northeast Nuclear Energy Co dubs of
Horthaait Utl litl«»t
8007300412
8007210486*
8007150438
8007210433
80053002B3
50-280 0
50-413 A
30-4,8* 0
30-4,4 » M
PR
8007O 1 0328
8007010337
B007O I 0337
B007O 10337
8007010334
30-249 P
50-213 F
30-B13 F
30-213 F
30-423 Q
8007010445
80070 104 SO*
S007O20039
BO 07020173
8007OSOS69
30-33* S
30-336. B
PR
30-213 P
B0070303S6
B007O30336
50-249 F
30-245 F
CORPORATE SOURCE INDEX
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEGORY
B007030356
50-245
F
B007O7025I
50-245
P
S007O70318
50-336
S
8007070334*
50-336
s
8007070361
50-336
S
BO0707Q372*
50-336
s
B0070BOI35
50-245
P
0007080164
30-336
P
8007080169*
50-336
P
8007O80176*
50-336
P
0007090231
50-213
F
BQ07090231
30-213
F
BO07100D35
PR
B0071Q0157
50-245
S
B007100164*
50-249
S
8007100167
50-245
s
B007 100172*
50-245
B
*
B007 170425
50-213
F
0007170519
50-433
a
80Q7IS0408
50-245
R
B0071B0413*
SO- 245
R
B00721023B
50-336
P
3007210349*
30-336
P
9007210374
50-336
R
8007 SI 0375*
50-336
R
S0072103B7
50-245
P
9007210520*
50-423
S
9007220437
50-245
P
9007220437
50-243
P
9QQ72S0467*
50-245
P
8007220467*
50-245
P
B007250300
50-245
P
BOQ7250300
30-343
P
B007250303*
50-245
P
90Q725O303»
90-245
P
800725040?
SO-336
B
B007250410*
50-336-
G
B0072B0574
50-345
P
H0072S05S2*
50-345
P
6007290052
PR
Northia»t Utilities
8007010337
30-313
F
900702043?
PR
3007020441
PR
800709O294
PRM
B00710O200
5Q-24S
P
9007100200
50-P45
P
B007HO466
50-343
S
B0071 10474*
SO-S45
5
0007140344
50-336
P
B00715O622
SQ-24S
I
S007 130622
50-243
I
8007 1 6O676
50-245
R
B0071606BO*
50-24S
R
B007170320
50-213
0
B0071B0137
50-313
0
8007180299
50-845
8
B0071BO307*
90-245
a
B00723004S
PRM
BOQ72B0673
30-313
p
8007280673
30-813
p
8007290697
50-249
a
Noi-thirn Illtnoli Univ
S0072203B9
90-10
D
Northern Indiana Public Qirvic* Co
000701047S
30-367
A
B007020493
30-367
0
80071 1043B
30-367
R
8007210464
50-367
R
B0072 50630
50-367
a
BQ07280I18
50-367
R
0007280141
30-367
11
B0072B04B2
30-367
R
Northern States Pouir Co
8007010260
30-283
a
8007010260
50-282
0
8007010267
50-882
0
B007010267
50-202
0
BQ07010311
SO-263
F
8007010325
50-263
F
80070 10335
50-263
P
BOO701O331
50-263
F
B0070 10376
5O-30 6
P
aoQ7oio3ai*
30-306
P
8007010524,
30-306
3
8007010329*
50-306
S
S0070 10331
30-263
8
0007010342*
30-263
8
80070 10349
50-2S2
0
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJCCT
CATEfiOriV
8007010549
30-282
Q
800701O9B3*
SO-2B2
P
E007Q2O162
50-263
Q
B 007030 17B
50-292
(i
BOO 7030 179
30-233
ft
8 007030 1BO»
50-292
R
S 007030 I B0»
SO-2H2
R
Q007030IB3*
SO-2B2
R
B0070301B3*
SO-2B2
R
H007030222
50-363
P
9007070315*
50-434
0
80070 B OSS 1
50-363
P
90070B0269
50-263
P
9007100067
30-263
P
9007100123
30-236
F
B007100190
50-263
S
6007100193*
SO-263
3
0007110119
SO-232
F
E3007110U5
30-202
F
8007140192*
30-232
Q
60071 3048 1
50-282
Q
S0071S061I
50-263
R
9007150614*
30-263
R
30071 60SS9
SO-2B5
n
S007160SA2*
50-232
R
B0071605A2*
50-283
n
6007160660
50-282
s
00071607O7
SO-2B2
Q
80071607-07
50-262
Q
B007170I94X
50-306
Q
0007170399
30-263
P
3007180300
50-263
P
SQ0710Q306*
30-263
P
E007210132
30-263
a
60072)0183
50-263
a
8007210 1B6
50-263
p
B007210196*
50-263
p
a 0072 10379
3O-306
s
OQ073103BO*
50-306
3
8007210437
so-asa
S
8007210444*
50-282
S
00072 I O509*
50-263
0
8007220090
50-282
0
8007220-090
50-232
o
8007220542
50-232
fl
8007220542
50-202
Q
300723021 t
50-202
Q
8 0072302 11
50-2B2
Q
B0072S0077
50-232
Q
B007E 30077
30-2B3
Q
S0072S0340
30-282
B
0007250408
30-494
0
3007250565
30-263
n
8007380056
71-901B
9007260036
71-9018
BOO 7280056
71-9100
B0072BQ037
30-263
ii
BOQ72BQ3ai
30-263
,
00072804 tO
30-263
,
30072804 1O
50-263
•
BOO7280441
30-263
.
B0072B048B
50-263
,
B0072B04B9
SO-263
i
BOO 7290669
50-282
S007290677»
50-28 2
BO 072908 41
9O-263
r
8007300463
30-282
r.
3007310106
SO-2S2
l"
BOO7310106
30-2-Q2
f
lorthern Thunder
B007S90703
30-4B4
1
lor t hu»tl»rn Univ
BC-0714O493
REOOD
B00725057S*
CQNTttACT
[otra Djir.a, Univ af
B007010060*
40-2674
fl007010067n
40-2674
BOO7OI0077>
40-2674
800701 OOB3*
4O-H674
8007010091*
40-2674
B0070 10097*
40-2674
BQ0721095B*
40-S674
B007210S69*
40-2674
luclea? Assurance Corp
8007190469
7I-669B
1
B00722Q068
40-B771
1
B007E20073H
40-B771
8007300001
71-6699
i
luctftar Data, Int
800710Q3IS*
CONTRACT
480
CORPORATE SOURCE INDEX
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEGQRV
Nuclear Energy Liability Insurance
8007110017*
SO-320
J
Anoc \ a tion
B007110043
30-320
J
80071 1004fi»
50-320
J
8007! 10091*
SO-3HO
J
0007110091*
50-320
J
50071 10053*
50-320
J
8007110052*
50-320
J
8007110057*
50-320
J
B007110057*
90-320
J
8Q071100&0*
50-320
J
0007110060*
30-320
J
S0071100&2*
50-320
J
80071 10063*
50-320
J
0007110060*
50-320
J
0007110060*
50-320
J
B007110073"
50-320
J
800711007a»
90-330
J
8007110077*
50-320
J
80071 10084«
50-320
J
8007UOOB9*
30-320
J
8007110091*
30-320
J
8007110095*
90-320
J
8007110098*
30-320
J
8007110098*
30-320
J
B0071 10103*
30-320
J
0007110103*
50-320
J
8007110107*
50-320
J
8007110188*
30-320
J
8007110120*
90-320
J
0007110128*
50-320
J
B0071 10132*
90-320
J
8007110132»
90-320
J
8007110135»
50-320
J
80071 10140*
30-320
J
0007110143*
30-320
J
8007110147*
90-320
J
8007110147*
30-320
J
8007110151*
50-320
J
8007110151*
90-320
J
B0071101S6*
90-320
J
8007110196*
50-320
J
8007110160*
30-320
J
B0071I0167*
50-320
J
8007110173*
SO-320
J
8007110173*
90-320
J
80071 10176*
90-320
J
Q007110176*
90-320
J
8007110178*
30-320
J
8007110201*
90-320
J
B007110208*
90-320
J
0007110212*
30-320
J
8007110217*
90-320
J
8007110222*
90-330
J
8007110222*
50-320
J
8007110224*
SO-320
J
8007110224*
90-320
0
Nuclear Engineering Co • Inc . (subs of
0007220905
B7-48
TelejJgne. Inc )
8007240155
71-6679
Nuclear Fuel Services, Inc dubi of
8007010001
90-201
I
Gettij Oil CD 1
8007010101
71-3768
B007010109*
70-143
8007010121*
71-5768
0007020637
70-143
8007030292
70-143
B007070014»
70-143
8007070191
70-143
B007070333
70-143
8007070339*
70-143
9007070350
70-143
8007100023*
70-143
0007100028*
70-143
8007100044*
70-143
B007 100052*
70- M3
8007100069*
70-143
0007140064*
70-143
8007150318
70-143
8007150920*
70-143
8007190363
70-143
B007 160943*
70-143
80071B047S
71-249
8007180483*
71-249
B007 180491
40-8681
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEgORY
H0071BOS99
0007210028
9007230441
6007250464
0007200104*
70-143
50-201 Q
90-201 Q
70-143
70-143
Nuclear Fuel Services. Inc > Weit Valley
Reprocetilng PI jnt
9007290137*
9007280552
0007290347
0007290713
00070B0246
70-143
70-143
70-143
70-143
30-201 0
Nuclear Pactajinji Inc
6007020561
0007020605*
S007070177
0007070179*
0007070102*
71-9130
71-9130
71-9130
71-9130
71-9130
Nuilear Power Plant Standard* Commit*"
Nuclear 8afety A»*ociatei
William GmbH
8007070103*
60*7280125
B007300337
0007100104*
8007190040*
71-9130
71-192
SO-4BB A
PR
XPORTLIC
Oak Ridge National Laboratory
0007020356
QOO 7090371
8007090395
B007I 10493*
0007140031
RES
NUREO
HEOOD
30-320 P
RES
8007140044
SOD? 140303
B007140507
0007140610
9007 140634
RES
RE6
RES
NUREO
RES
8007150016
800717064B
8007180063
0007100392
0007100334
RES
RES
NUREO
RES
RES
8007210498
B007280092
0007S00D99
8007290541
8007300041
30-247 P
RE0
RES
RE8
NUREO
GfPlct of Manaoemetit b Budgrt
0007300973
800731 024<b
8007310231
0007310SB4
0007170410*
NUREO
NUREO
RE0
NUREO
COMMISSION
Offihore Power 5yit*m« (tubs of
Uettinghouse Eltetrtc Corp )
Ogle Petrol»urtn Inc
Ohio St»te Univ
B0072SQ729*
B0072 10399
8007210404*
8007020293
00070 10383
COMMISSION
30-437 A
50-437 A
40-8693
90-130 0
Ohio. State of
Ok lahomai State of
0007090403
B006110406
8007100246
8007020A13
B007220939
REQ0D
PR
PR
90-956 0
PR
OH shorn j, Univ of
Dmaha Public Power District
B007310133
0007030066
Q007210491
8007010471
BOO7010477*
30-936 Q
FOIA
NUfiSO
50-283 P
50-203 P
BQ07020073
0007020299
0007020312
8007020419
£5007020430
30-283 Q
30-S83 0
PR
30-205 Q
90-203 0
0007030001
8007070373
800707038S*
S0070S0364
B007U0094*
PR
30-283 5
90-205 5
30-283 P
30-3B5 0
0007170376
8007170379*
8007180122*
B007210IB7
8007230930
30-2S3 H
30-283 R
90-283 Q
30-283 Q
90-203 F
8007230330
8007240130
9007240134*
0007200330
8Q072BOA01
50-283 Q
90-285 S
30-203 5
30-283 P
90-283 Q
Oregon State Univ
fl00730007B
00071 90539
0007130962*
30-283 P
30-106 M
30-106 H
CORPORATE SOURCE INDEX
481
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEOORV
8007150649
50-243 P
Ortgon, St*t« of
8007100017
PR
8007190524*
CONTRACT
B0072Q0503
30-344 0
B007300357
90-344 0
B007300364
90-344 H
0007300372
50-522 0
B007300372
50-322 0
8007300377*
30-522 0
8007300377«
50-532 0
90073004B1
30-344 0
8007300490*
50-344 0
SOO 7300494*
50-344 0
8007300SOO»
30-344 0
BOO 7300506*
90-344 0
Qrtloft Mineral Servicei Corp (subs
of B0072B0077*
40-9771
Ortloff Corp )
Qiann< E U
8007000059
50-367 0
PRC Planning & Economics, Alan M
B00722044B*
50-3B7 F
Voorhcei & Atioclafcci Div
P8E *• 0 Reccarch Corp
0007110450*
90-272 0
PX Enginiirina Co < Inc
8006190921
71-9139
0006190923
71-9139
B006 190929
71-9139
Pacific Qai d El «t trie Co
8007010469
90-133 P
0007020394
BO-275 A
B007070123
90-275 0
8007070133
50-279 A
B007070206*
50-275 A
8007100152
PROJ
0007100154*
PRDJ
00071 40242
71-9094
8007150377
90-273 F
00071 50 96B
50-133 fi
8007150573*
50-133 R
8007160320
50-279 A
B007 160521*
50-275 A
B007180340
50-279 A
8007180344*
90-273 A
0007100358
90-133 0
80071B0405
50-273 0
8007810574
50-317 Q
0007230016
30-133 0
8007230662
50-133 0
80072:40107
50-275 0
80078 503B6
50-133 0
80072:50698
30-275 Q
00072S0660
50-133 0
B007290697
50-275 Q
8007390829
30-314 F
B007S90032*
50-514 i F
B007290B33*
90-914 F
8007300280
50-275 0
8007310468
50-133 Q
Pacific Legal Foundation
8007100254
PR
0007100297*
PR
Pathfinder Hinei Corp
B007010443
40-3239
Plnniulvania Power & Light Co
0007080213
30-387 9
B0070B0213
SO-397 S
80070B0240
80-387 K
8007000240
50-387 K
0007140170
30-387 8
0007140170
90-387 8
9007140179*
30-387 a
8007140179*
80-397 B
8007140197
50-387 8
8007140340
30-337 8
8007100282
50-3B7 S
8007190364
50-3B7 8
8007180364
30-387 8
9007180434
90-307 8
8007180434
50-397 8
8007210341*
50-397 Q
8007220441
30-387 F
8007230147
PR
8007240131
30-387 K
B007340131
50-397 K
8Q07S4014S*
30-387 K
8007240142*
50-397 K
8007240143*
30-387 K
8007240143*
30-3B7 K
8007250487
50-367 S
9007290487
90-387 B
8007250929
30-397 A
80072B0213
90-387 8
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEODflY
9007380215
50-3B7
9
90072B065O
50-387
8
80072B063D
30-337
S
9007390264
50-397
s
0007390264
50-397
9
B0072904SS
50-337
3
B007290455
50-387
a
BQ07290623
90-3B7
B
BQ07290623
50-397
B
0007290716
50-397
3
8007290716
50-397
5
Panniulvania State Unw
B007 100434
FJEGGD
BOQ714044"?*
PFJ
BOQ73 10303
SO-5
F
Pennsy Ivaniai State of
8C10701O5SS*
SO- 320
P
B007020313*
50-33O
U
B00707027B
30-239
0
60071 00 IBi*
SO-3BO
P
BOQ714O046*
PR
800716.0444
50-3SH
H
800723069 i
50-320
H
People Against Nuclear Energy
9 0070 9 000 5*
SO-2B9
0
BOQ722Q927
50-209
0
BOQ722Q330*
5O-299
O
B0072BQ613
50-320
O
Perkins. Coie, Stone, 01 a en t, Williams
B0071 00171
30-92H
0
B00723079-7
30-822
Q
8007250351
50-532
0
P»ru
80071301 69 »
COMMIES 1
ON
Petrotomic* i Ini
8007230020
40-665'9
Philadelphia ElettrU Co
B00701037B
50-277
Q
BOO 702004 1 »
50-277
0
B007020072
30-277
Q
BOO 7070352
50-270
B
8007080216
30-377
S
BOG7oao2i i
50-277
8
8007090263
30-332
S
B007090H6S
30-352
S
8007 100 I 5S*
50-277
P
B007170SO7
30-277
Q
8007 100 106
30-277
Q
8007180106
30-277
Q
3007190117
30-277
Q
9007100117
30-377
Q
80071 804 19
30-277
R
9007180*19
SO-H77
R
G0071SO'133»
30-277
R
BOQ7tB0433w
SO-277
R
B0071B0443
30-277
P
BOQ71B0443
30-277
P
9007100446*
50-277
P
80O71SO446*
50-277
P
00Q7210214»
50-382
0
BOO72102I5*
50-277
a
BO 0.721032m
50-352
a
80072tO37B
30-27 B
B
800721O4O3
30-877
B
8007310947
30-277
Q
B007210S47
50-277
Q
BOO72 10567
30-392
0
80Q721O5i7
SO-332
0
80-07250531
30-277
P
9007230723*
30-277
a
S00724QOO3
PR
B00724Q226
30-352
B
800724022*
30-352
B
3007250132
30-332
S
8007250 I H2
30-352
&
8007250471
30-332
A
BOO7230311
30-277
0
9007250511
30-277
a
8007850631
80-277
a
8007250631
30-377
0
9007290304
30-270
p
900728038 H«
30-270
p
BQO72B039Q-*
30-278
p
BQ07S0036-0
B 0-277
a
0007290649
50-277
B
0007290649
30-277
B
800731 0296 »
30-352
3
B0073i029i*
30-352
s
B007310414
80-277
R
PhUlbrtck, 8 a
6007 1 BObOt
30-70
a
Philippine
BCJ07 160796
HEQOD
Pioneer Service 4> Engineering Co.
9007 OBOE O9).
30-305
p
482
CORPORATE SOURCE INDEX
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEOOBY
Pi t tsburBlii UJILV of
B00630D112*
flCRS
S007 100357
PDM
Popular Bluff Hasp Popular Bluff, MO
SOO71OQI16
REOOD
Portland Cement Association
6007310010*
CDNTHftCT
r
Portland Cffnoral Electric Co
a007nj033iJ
SO-SJI
r
BC070104ia
30-344
p
8007020594
50-344
<9
BO 07030233
50-344
0
BC0707Q273
50-344
p
8007070300
30-344
p
8007070307*
50-344
p
8007070340
30-344
p
8007080418
50-344
s
SQ0709Q420*
50-344
B
S007Q90227
30-344
p
3007090300
50-344
F
B0070 9032=?
50-344
a
9007090331
NUREO
3007090340
50-344
p
61007100039
50-344
0
9007100051
50-344
a
6007100Q5B*
50-344
0
B0071000fia»
30-344
a
S0071C0343
PRM
B0071403-12
30-344
R
8007140315*
30-344
n
80 St7 150 ISO*
SQ-344
a
80071 305S1
50-344
8
80071 50B20
BO-344
s
BO0715OB2&»
50-344
s
BOD7 160420
PR
B00716060S
30-344
p
9007160461
50-344
0
8007170424
50-344
p
6O07 170483"
50-344
p
6007170562
50-344
R
80071B0347
30-344
S
SQ07220570
30-344
P
6007230797
50-532
a
B007B5Q350
90-344
a
B007250360
SO-344
a
8007330413
30-314
a
BO 07330 4 74
50-344
p
BOQ7250401*
50-344
p
8007280179
50-344
a
0007280543
50-344
B
B0072B0353*
SO-344
8
B0072SOS43
90-344
S
8007280573*
50-344
B
80072BOM8
30-344
B
3007390994
50-344
a
B0072708B9
90-344
a
3007300296
30-344
a
B0073 00333
50-344
0
B0073003B7
30-344
p
6007310433
30-344
s
8007310472
50-344
a
otomae ReisaTch. Ine
6007300581*
CONTRACT
duel- ^uthovitij of ths State of Maw York
B0070JOI64
50-333
a
8007010440
50-866
s
80O70I0452
30-ZBi
s
8007O10453*
30-aB6
B
8007010481
30-333
8
BOQ70104B:5*
50-333
S
800 701 04fl {,
30-333
S
B007O1Q49S*
50-333
8
3007010511
50-333
8
600701091"?*
30-333
e
B007&3Q234
50-286
F
B007070212
50-333
F
30070 &0303
50-236
V
B007080332
50-333
P
•00Q7CB03SO
50-2B6
S
8007080354*
50-286
B
B0070B03B3
30-296
e
BO 07030362*
90-266
e
B0070B0367
50-2B6
p
8007090192
30-333
R
B007090I 93*
50-333
R
8007140333
90-236
S
6007140347
50-236
Q
30071 40349
50-333
B
BOQ7MO374t
50-333
8
8007HD3B3
50-333
B
S007140394*
50-333
3
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEOOR1
V
8007150707
50-333
B
800715071S*
50-333
S
B007170316
30-2B6
a
8007 1801 H
50-236
a
Q007180128
BO-333
a
8007180397
SO-2Q6
a
8007210376
50-286
R
B007210377#
30-296
H
800721 04 1Q
50-206
8
8007210466
30-236
a
800721 0326
30-333
a
Q007220160
30-247
0
8007230362
PR
8007230290
80-333
a
8007290317*
30-206
a
S0072S0669
50-333
a
8007280461
30-236
i
8007290461
30-204
i
8007280463*
30-2S6
I
8007200463*
30-286
i
8007280471
30-220
a
8007280913
50-333
5
8007280924*
30-333
s
S0072B0610
50-333
e
B0072BOA17*
90-333
B
B007280662
90-333
B
8007280A67*
30-333
B
8007290032
30-2B6
B
B007290322
30-347
0
B007S909BO
90-286
P
8007290692
90-333
P
S0072907EB
30-286
P
8Q07B90739
90-286
F
BOO 73 10426
30-286
S
8007310430*
30-2B6
S
B007310474
50-333
a
Pralrii Alliance
S0071 40337
30-10
0
Preiidant of US & Executive Officti
8007020096*
30-443
H
8007140023
30-367
H
80071 4010B»
30-437
H
B007130013
30-437
H
Prlnctton Unlv
8007090269
30-10
D
Principl* College
B007090418
REOOD
Project AUDciutet
SCO 70704 IB*
CONTRACT
nn— r>ii
000/0 1 0234 i*
S0070 10344
OU~«SQ/
30-267
Q
R
8007010346*
90-267
R
8007010496
50-247
B
8007010906*
SO-267
B
8007020309
30-267
a
6007080210
30-267
s
B0070B021S-
30-267
B
B0070B0234
90-267
B
B0070B02A2*
90-267
S
800708026B
90-267
8
B007080275*
30-267
8
8007080289
90-267
9
8007080304*
90-267
B
8007080406
90-267
R
8007080409*
30-267
R
8007080422
SO-267
S
B0070B0423*
90-267
8
B007090333
30-Z67
P
8007100173
30-267
8
8007100176*
30-267
S
8007130690
30-267
a
B007220439
PR
8007230334
30-267
3
B007230539*
90-267
B
8007230543
90-S67
S
800723034S
90-267
S
8007230534*
30-267
s
8007230339*
30-267
5
B0072B0493
30-267
P
B0072SD&49
90-267
a
80072B0692*
30-267
a
S00729062-?
30-267
j
Public Bervlo Co of Indians. Inc
B007010096
30-54A
A
8007020031*
30-346
a
8007 100229
90-346
8
8007140906
90-346
a
800721 003B
90-34*
A
B007220947
30-346
H
8007230093
30-346
a
8007830230
30-946
a
CORPORATE SOURCE INDEX
483
AUTHOR ACCESSION
AFFILIATION NUMBER
SUBJECT
CATEGDRV
BOQ7250397
50-546
8
80072S0591
50-546
F
9007280667
50-546
B
Public Service Co of New Hampshire 8007010223*
50-443
0
aO£)70B0011»
50-443
I
8007170596*
50-443
s
B0072 50623
90-443
Q
Public Birvici Co ttt Oklahoma 6006300368
50-556
A
8007300569
PR
Public Sirvict EUctric I* Oai Co of N»u 8007030161
50-372
P
Jernij
BQ07Q301A1
30-272
P
80070301329
50-311
P
8007030232
90-272
H
BO 0703024 4
90-311
P
BO 07030249
50-272
P
8007030249
50-272
P
S007O70110
90-311
P
8007070285
30-272
P
8007070209*
50-272
P
8007070289*
50-272
P
BOO707034B
50-272
Ft
80 070703 S6»
50-272
R
B0070B006B
30-272
F
B0070B006B
90-272
F
8007080267
50-272
B
BOQ70B02SO*
90-272
8
80070B0423
90-27H
S
80O7080426*
50-272
B
8007100197
90-272
B
8007100202*
SO-272
8
BOO71 10441
50-272
0
B007U04S6
30-272
P
8007110456
50-272
P
80071 4042?
30-872
F
BOO7 1 50509
50-272
0
8007150916
30-273
S
B0071S0917*
30-272
B
8007130596
90-272
R
800713060**
50-272
R
8007150681
90-272
B
8007150628*
90-272
B
8007190631
50-272
a
8007150672
50-272
B
6007160679*
90-272
s
80O71&062B
50-311
P
B0071A0633*
50-311
P
8007170*37
30-311
3
80.07170448*
50-311
a
8007170570
90-272
Q
8007170570
90-273
0
B007 170642
50-272
Q
BOO7 170642
50-272
Q
8007210219
50-311
P
BOQ72102AB
30-272
Q
80O72102AS
30-272
Q
800721QE82*
BO-354
Q
8007210365
3O-272
P
8007210309
90-311
P
8007210494
50-27S
S
8007210307*
30-272
B
8007210552
50-272
Q
BOO721060B
30-272
fi
BOO72106QB
SO-272
0
BOO72S03B1
30-272
B
B0072203B2*
30-272
a
8007220619
30-278
3
8007220627*
SO-272
B
800723029?
90-334
Q
8007230442
90-272
P
8007230442
90-27B
P
BQO72B0443*
90-273
P
80072B0443*
30-272
P
80072B0624
30-31 1
S
8007280632*
50-31 1
B
S007E70684
90-31 1
S
8007290699
90-278
R
BOQ7290710*
30-272
R
B007290711*
50-31 1
B
80072907 IS
90-272
B
8007290729*
30-272
S
8007290837
30-272
5
8007290844*1
30-272
B
8007310293*
30-3S4
S
Putrta Rico Elictric pouar Author! tij BQ07020604
50-376
Q
AUTHOR
AFFILIATION
ACCESSION
JiUMDER
SUBJECT
CATEGORY
9007230S35
50-376
G
Pur due Ujiiv
BOO 7090380
FOIA
RMI Co , Hfll Titanium
8007280397
XPOflTLlC
80072804O3*
KPORTLIC
HPF Ecological AssDclatsi
6007220538
50-10
D
Rad Ssrvic e«r Inc
6005 09052 4*
PT9
Radiation Detection CD
Q007020fiB2
PR
RadiJtion Manaoament Corp
00052<JOi07»
PT9
B0071703E9*
Fa (ft
9007170416*
FOIA
BOO 7340420*
50-277
H
Ha I pi! Stone & Co
9007160504*
CONTRACT
Reactor Control*. Inc
80070IO193*
50-B37
P
Reactor En piriinentsi Inc
8007290857
XPOflTLlC
Rens»«Ia«r Polytechnic In»t
9007090413
flEOOD
600730059B*
8007100113
CONTRACT
REOOD
8007110237
XPORTLIC
8007210316
XPDRTLIC
60072 1O318*
XPDRTLIC
B0072B0323
XPORTLIC
B0073100B7
XPQRTLIC
Rh in* -Be he 1 de-Veralroe Zuiare Appapatenboi
Jim B007310171?*
QA799
B007310182*
G 0 07O 902 72
OA999
50-193
p
9007210118
71-17
BOO 72 1O 130*
71-17
90Q72403B9*
70-2153
Roch«it»r Gas tr Electric -Carp
8007020018
50-244
Q
9007070342
50-244
F
800709O272
50-244
P
80071509B4
S-Q-244
R
80071 50390 »
30-244
R
8007160637
30-244
B
60071B0141
50-244
a
B007210443
50-244
s
B007220403
50-244
p
H007220407-"
30-244
p
900723000B*
50-244
a
8007B40645
PR
6007290498
50-244
a
B0072B0633
50-244
a
B0072B0639*
30-244
3
BOO 729 0740
50-244
p
8007310350
50-244
F
S00731037B
50-344
F
8007310401
50-244
P
Rock we 1 1 International Corp - Atomic*
8007100013
PR
IntBVnational Olv
Roc knit 11 Int»rna tlonal Corp . Entrg<j
6007230507
50-329
A
By i t im i Div
G0072S05SB*
70-25
Rocky Mountain Energy Cu
8007020702
40-8380
60O7030002
40-9380
BQ07160390
40-8380
BOO71B0057
40-8697
6007210164
40-8380
B00721O224
40-8390
8007220022
40-8380
8007220033
40-8380
B007240100
40-8380
8007290890
40-8697
Ropcc & fflra-j
B007090010
50-443
1
Rural America
80072BO&72*
50-409
0
8007290677*
30-40-7
0
B F Apfhli*nt». ttd
S M Stollor Corp (subs of Arthur D
80070B0056
800707O062*
40-315
CONTRACT
Little, Inc )
SC3 Englnoen, Ire
8007070 OSB*
CONTRACT
SEP Owner* Group
8007 10 0420*
30-10
P
Sacr»n«nto Municipal Utility District
8O070Q01B3
so-31 a
P
8007030-270
50-312
B
8007080277*
50-312
8
8007100203
50-312
P
6007100204*
30-312
P
8007 IS 0556*
30-312
0
8007 IS 0588
5O-3 1 2
R
BOO7 190592*
50-312
R
BD07180541
50-3 1 2
0
8007230432
BO-3 1 2
P
8007230443*
30-3 1 2
P
8007240123
30-312;
P
8007240192
50-3 1 2
a
8007240198
3O-312
Q
B00725034B*
30-312
P
484
CORPORATE SOURCE INDEX
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CflTEOORV
80072S0370
8007250676
S007290B47
3007300072
8007300081
50-312 Q
ao-a 1 3 Q
&0-312 Q
PR
PR
Bilf Energy Allianta
8007300370
B007310410
B00731041B*
B00731D477
B007110003
30-3 1 2 H
30-312 S
SO-312 S
30-312 0
70-2909
Sal 1 iburV' HA
Bdlirda River Electric Cooperative, lie
San Diego Qas £ Electric Co
San Lull Oblspo Mothers fc-r Peace
B0071I005S
BQ07140407
BQO72104B(>*
B007O90234
8007230508
70-2909
30-4-13 0
30-413 A
S 0-206 P
50-273 0
Sand la Laboratorivi
BOQ7300096
B007310466
B007-Q20Q11
S007UOH8
3007110351
50-275 0
50-275 0
RES
FiEB
REB
8007180047
B0073800B1
BQ072901S2
BQ07 290233
0007290351
UUREO
RES
NUREO
RES
HUREO
Sargint >t l_utnlu, Inc
B007310007
BQQ7310231
8007310241
8Q07Q20416
80071504B6
HUREO
HUREO
nunEo
PR
HUHEO
a0071S0537»
8007160346*
S007 160569"
8007160574*
B00723016Q"
50-373 A
50-454 «
SO-434 «
50-454 «
OA999
Sasiafrai Auduban Society
Scanpauer, Inc
Science Application!- Inc
8007010055*
eOQ7O10244»
80070 10SB2*
B007 140633*
80071+0650
50-546 H
F01A
CONTRACT
CONTRACT
FOIA
B(l f-Poiuil-.d Lighting, Ltd
S«fia te
GOO 7290332*
BOO 7f 00213*
8007240462
6007020323*
B007 110093*
3 0-460 A
FOIA
FOIA
50-320 U
30-271 H
B0071I0314»
B007II031B
B0071 10323'
B007I10507
B007I10571*
50-335 H
30-346 U
MIBC
PH
30-4S2 U
S>nata> Appropr lad 1 am
8007140231*
aoo7aio*6B»
80072 S 0067 »
80073 1052B*
9007020 IBB«
HO-10 H
50-333 H
50-320 H
50-282 H
COMMISSION
S*n»te. Judiciary Committee
B»nata. Sinai J Builntu
5>n*lbl« Malcia Pouer
3007110003
aoo?oaooB2
80070S0607
8007020610*
BOO? 11 031 5
PR
COHMISBIQN
30-309 0
30-309 0
P(l
Shannon t Wilion, Inc
B007300122
B0073001S7*
B0072 90393*
B007250396*
B007250398*
50-309 0
00-309 0
50-397 A
50-397 A
30-397 A
BJiatiii Pittmen. Potti & Troubri dg-a
8007020482
BQ07020621
8007020633
9007020689
8007070310
30-320 O
30-33Q G
50-23-} fl
PR
30-484 0
B00707O3IS*
B007I0019I*
B00714O224
G 007150537
SO-484 0
PR
30-2B9 0
50-312 0
50-312 0
50-239 fl
50-289 0
90-2B9 0
50-209 0
"" """ 0
0
0
0
0
P
AUTHOH
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEGORY
B007230333
B007230333
B0072S040B
B007290533
8007300301
90-320 a
30-320 0
50-484 0
30-346 H
30-266 0
Shctnani D P
0007300437
8007300463
B007070337
B007070353*
B00707036S*
30-2B9 0
50-302 0
30-320 0
50-320 0
30-320 0
Sheldoni Harmon ti U»i»t
BOO 7070371*
B0070S0007
B0070B0004
B0070BOOOB.
B0070B0043
30-330 0
30-320 0
30-2B9 0
30-2H9 0
SO-2B9 0
B007 100033
B007 100037*
B007100042t
0007110040
B00714001B
30-133 0
BO- 133 0
30-1 S3 Q
PR
BO-3B9 0
B0071 40022*
B0071403B7
B0071 50352
BOD7210487
B0073 10493*
30-2B9 0
PR
70-143
30-2B9 0
80-389 0
B0073205S9
B007220S30*
8007330229
BOQ7240044*
B0073400SO*
SO-2B9 0
30-2B9 0
FOIA
COMMISSION
CQMM1BBIOH
Bhoriham Opponent! Coalition
B007250043
B0072907B1
8007300039
8007300043
80072907B1
FOIA
OHO
PR
PR
ORO
Sierra Club
31 gnu Chemical Co tiubi of Blgma-Aldrl
ch Corp I
BOO 7290809*
B007030003
B007070029
8007210129
B0072B0393
ORB
PR
XPDRTLIC
XPORTLIC
XPORTLIC
Btagltoniani Concerned About Nuclear
B0073104B4
8007030303
XPORTLIC
50-322 A
81 eminent, D, B
Small Du*lntii Administration
Smith Ionian Inititute
B007100112*
B0072 10331*
8007140473
CONTRACT
CONTRACT
REOOD
Bn»ll t, Wllmer
Social Reuarch Appl icationi Corp
South Carolina Electric & Oat Co
8007180403
B007 160496*
B007070269
B007070270*
B0070B0393
30-273 0
CONTRACT
30-395 C
30-395 C
30-393 A
B007090011
B0071I04B9
BOO? 160232
B007 170607
B007170612*
30-393 A
30-395 B
30-395 A
30-393 A
30-393 A
B0071B0236
B007220219
0007220390
0007220392*
B007220420
30-395 Q
90-395 Q
30-393 F
30-393 F
30-395 A
B00733030B
B007330459
8007230491
B0073906S6
8007290627*
30-393 A
30-395 B
30-393 A
30-393 F
80-395 F
South Carolina, State of
South Dakota. 9-tat* of
Southern California Ed t ton Co
B00731042B
B0071100B7
B007300074*
0007150453
8007010216
70-3860
PR
COMMISSrON
30-484 0
30-206 Fl
0007010216
B0070 10338
8007010338
80070 10465
8007010479
BO-3O6 R
50-361 A
30-361 A
30-206 P
50-361 A
8007010479
8007010533
8007010537*
8007030149*
8007020149*
50-361 A
30-206 8
30-206 8
30-361 Q
50-361 Q
8007020342
8007020366*
B007020372*
30-B06 P
30-206 P
30-206 P
CORPORATE SOURCE INDEX
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEGORY
B0070BOOB1
50-361 A
B007QBOOB1
50-361 A
B007QB0271
S0-20i F
B0070B0403
50-206 S
B0070B0410*
50-206 S
B00709033Q
50-361 S
B007090330
50-361 S
8007090337*
50-361 3
B007090337*
50-361 S
B007 100262
50-206 R
B00710026S
50-206 R
B0071003B6
F1EQOD
0007110401
50-206 P
B007 140034*
50-361 O
0007140034*
50-361 G
8007140091*
PH
BOO? 150579
50-206 P
B007I 50597*
50-206 P
SOQ7 150599
50-206 R
BQ07 150605*
50-206 R
8007170563*
50-S06 O
B0072IO4&3
50-361 A
8007210493
50-361 S
B007230011
50-361 Q
H007230aB7*
50-206 0
B007230579
50-361 S
B007E400BG
50-361 Q
B0072400BB
50-361 Q
8007250335
90-206 Q
8007250338
50-206 Q
8007250361
50-361 Q
8007250636
90-206 Q
B0072B0072
50-206 &
80072B0376
50-206 S
80072B03B2*
50-206 S
B0072B0391
50-206 S
SOQ7260396*
50-206 3
B0072904B9
50-361 a
8007290620
50-361 A
S007290706
30-206 P
ao07290S63
90-206: a
B007300303
90-36L Q
6007310162
50-206. Q
B00731020I
50-361 Q
6007310201
30-361 Q
Southueit Reieinh Imtitute
B00703007I*
CONTRACT
S007070174
PR
Bouthueet Reieirch *nd Inf orm»t Ion Center
8007030127
PR
S007110019
PR
Bpltgtl & McDi»rmld
8007090051
50-309 M
B0071 50449
90-445 M
8007150449
50-449 H
8007150459
90-4B4 0
Bt Elinbtth Hoip Appleton.HI
8007100416
8007090131
REQOD
40—90121
AMOCO)
Standnrdiitd Nuclear Unit Foiuer Plant
8005090053
90-4BE 3
Sgittm
8007010162
50-4BB Q
H0070S037B
90-462 3
B007070325
50-4B2 S
8007070323
90-4B2 S
B0070703S3
90-4B2 S
B007070325
50-483 9
BOO? 100441
90-4Q2 O
B007290294*
30-493 3
B007290590
90-402 S
B007300S11
90-482 A
B0073 10302*
90-492 S
B0073 10302*
30-403 S
B0073 10302*
90-402 S
B0073 10302*
B 0070 1062 7*
50-403 S
CONTRACT
StateiDept of
0t*ttiDept at, Bureau of Qctani $•
B007170191
B007010009
XPdRTLIC
XPORTLIC
Internatl Environ & Scientific Affairs
6007010012
XPQRTLIC
B007010019
XPORTLIC
8007020260
XPDRTLIC
8007100146
XPQRTLIC
BOO? 140560*
SECV
BOO? 170003
XPDRTLIC
BOO? 170072
XPORTLIC
8007170204
XPORTLIC
BOO? 170223
XPORTLIC *
AUTHOR
AFFILIATION
ACCESSION
NUMBER
StearnB-RoflBT. Inc
Stone Is Ifffbi^er Engineering Carp
Uebstei-i luc
Stroock, Strooc i I Lavan
Student Murivi A*-t Delation at Penntijl
la
Siiil tier 1 ind
Bijnurgy, Inc
Bysttm» Control, Inc
TECH-SIL, Inc
Taiwan (Hrputlic of China)
Taunt on Municipal Lighting Plant
Tech/Op* (Tichnic'l Qper*tions, Inc )
Techn*»toclates, Inc
Teknetroni Inc
Teledyne Energy
Taledijne Engineering Bervicei
Temple Unlv
T«nne*aee Va 1 1 oy Aut
9007170333
B007I7O251*
9007170255
B007210073
9007210076"
9007210076
8007340440
Q0072B0547
9007280559
BO 072902 IB
SO 07030039*
BO 07030 047»
3007030059-
S007010172*
3007020337
BO 07 100290*
B007100SB4*
9007100284*
3007100284"
aG071002B9«
9007100893"
9007100293>t
BO 07 100 2 93*
BO 07 100 2 93"
H00710029B*
800710029B»
9007100298*
0007100303"
H007110I93"
B007110I94"
B007110196*
B0072<IQi66.i>
B007300064
B007H0583
B007140601
H0072'10I61"
9Q07240437
9007110443"
BO 07 1 60802
B007O700S3
8007300 17B»
8007300130*
8007170214
BOQ7240472
B0070B0033*
8007030375
80 070303 7fo«
BO 070303 7B*
BO 070303 79"
3007030391"
B007030 3 B4H
B0070303B3*
B0070303B£i»
B007030337*
B007 100373
B007100376*
B007 140203*
B0072 IO331*
B0070700S7«
B007OI0240
8007010249
BO 07 150 326
8007110433
3007310386
B00731O3B7H
8007100007
fl 006230379
B00701O3E7
60070 1O338
8007010350"
8007010370
B00701O377*
B 007010383
S007O 1 03B6
80070 103B6
9007010417
8007010419*
800701 0436
8007010439
3007010438*
3007010490
50-280
so-aeo
30-260
SO-EBO
30-2BO
50-260
50-2BO
so-aoo)
50-2BO
SO-BBO
3Q-2BO
90-2BO
30-2BO
90-2BO
30-2BO
50-2DO
SQ-HBO
90-260
30-337
PR
30-339
30-33?
30-339
SO-3Z9
50-329
PR
30-3 IB
30-327
90-3-18
50-51 D
30-296
30-29fi
30-337
30-327
30-32B
30-328
30-327
30-327
SO-43B
50-327
30-327
30-327
486
CORPORATE SOURCE INDEX
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEQORV
8007010499
aooroio3O2»
B007010Sia
B00701051&*
EDO 7 Q 10532*
3007010533
B007010S29
B007010333*
0007010534
5007010539*
B0070 10541*
B007020347
aotnoao-w?
3007020499
H007030499
0007020499
8007020543
9007020544
3007020545*
9007020531*
6007020619
6007080619
60Q70S0627
B00702Q740
0007020742
8007070012
B00707004S*
B00707026B
HO 07080220
8007080233
0007080233
8007080261
80 070S02B3
8007080236
BOO70B03B6
£007030286
BOO 708020 B*
8007080391*
8007000273
G0070B0277I
9007080301
8007080308*
B0070B0313
6007090331
9007000333*
800708033-1
0007000341*
B0070B0370
0007080373*
8007080300
B 00700-0380
BOD708O300
3007080388
8007060394
600700039?"
6007080400
aO07080402(t
8007080403
B0070BQ4ll«
EQ07080413
00070BQ416*
S0070900O3
8007090006*
8007090222
0007090232
8007090249
BOO 709034 9
0007090238*
S007Q70SSB*
B007 1 00047
B007 100030*
8007100034*
8007100169
9007100205
9007100205
8007100209
B007100209
3007100213*
50-327
50-327
S 0-32 7
g 0-327
50-337
5O-327
3
SO- 327
S
50-337
3
50-327
S
30-327
B
30-327
B
30-327
a
50-239
a
50-259
a
SQ-259
a
50-239
a
50-320
3
EO-333
3
50-328
0
3Q-32B
S
30-370
S
5Q-39O
8
30-327
a
50-327
0
PR
•tO-1341
4.0-1341
50-259
p
50-327
a
50-390
A
50-39O
A
30-337
S
30-337
3
BQ-33<i
P
50-259
P
50-259
P
3-0-337
B
50-327
B
50-259
B
50-359
8
90-299
B
50-259
B
so- as?
8
50-327
a
30-399
a
50-327
s
30-337
a
50-560
a
50-260
B
50-239
P
50-259
P
30-390
V
30-390
V
50-260
8
90-S60
S
50-327
B
50-327
B
90-360
B
50-2iO
8
90-296
B
50-296
a
30-259
B
3O-2S9
B
3O-390
B
30-390
S
30-327
B
30-327
B
30-327
a
80-327
B
PR
PR
PR
30-438
a
50-43B
a
SQ-43B
0
G0071C0233
6007 100233
6007100236*
BO 07 IOCS 36*
0007100232
B0071Q032B
30-438 S
90-43B 6
90-430 S
50-438 E
50-438 B
30-438
30-40fl
JO-43B
50-853
Pft
AUTHOR ACCESSION
AFFILIATION NUMBER
SUBJECT
CATEGORY
8007110039*
50-327
0
9007110291
30-260
a
0007110320
30-Slfl
a
B0071 10320
90-310
8
8007 1 10320
90-91Q
B
S0071 10320
30-31B
8
80071 10320
SO-51B
a
90071 10330
30-518
s
8007110326*
50-510
B
8007110328*
50-518
a
00071 103281
SO-SIB
3
00071 10328*
30-918
a
0007110320*
90-910
a
00071 1032B*
30-91B
s
0007110372
90-327
a
B0071 10374*
90-327
B
8007110370
30-276
B
00071 10380*
30-394
B
0007110300
50-296
S
0007110394*
90-296
a
8007110425
30-276
a
8007140240
PRM
H0071 40349
30-31B
B
00071 40333*
30-518
8
0007140422
90-390
a
8007140122
30-390
B
0007140427*
30-370
B
0007140427*
30-390
B
0007140443
90-32B
8
B007140496*
50-32B
8
8007130493
30-327
8
8007130466*
30-327
a
8007130470
30-327
a
0007130472
30-327
p
00071S0472
30-327
p
B0071 30400*
30-327
8
8007130491
30-327
9
80071S0901*
90-327
a
HQ07 150304
30-327
B
0007190312*
30-327
B
0007130321
90-327
p
8007130921
30-327
p
B007 150322*
50-327
f>
0007150346
30-43Q
A
0007150346
50-43B
A
8007130391
50-438
A
8007130370
30-259
8
0007190371
30-327
P
0007190371
30-337
P
0007130374*
30-257
a
0007130370*
30-327
p
8007130300
30-327
a
80071 30 9B2»
50-327
p
8007130985*
30-327
S
0007130640
50-327
r
0007180640
30-327
p
0007130699
30-966
8
0007130663*
90-366
a
8007130692
30-327
p
8007190692
30-327
p
0007160424
90-43B
8
B007 160424
50-438
a
8007160471
50-327
p
B007160471
50-327
p
0007160473
30-966
B
8007160473
30-566
8
800716047B*
50-327
p
3007160484*
50-327
p
0007Ii0319
50-327
B
0007160523*
30-327
a
8007160853
30-237
R
0007160356*
30-239
R
B007160371
30-32B
s
3007 160371
50-328
8
8007160371
50-328
8
00071&037B*
50-320
s
BOQ7 160370*
30-328
a
B007 160570*
30-328
B
0007160643
30-327
F
0007160643
30-327
F
8007 1 60650
30-43B
8
8007160650
30-43B
B
SQ071iQA36»
30-43B
a
0007160636*
30-438
B
B007I60666
50-330
B
CORPORATE SOURCE INDEX
AUTHOR ACCESSION
AFFILIATION NUMBER
BUDJECT
CATEGORY
8007 J 70272
50-390
Q
8007170342
50-566
S
BO07170342
50-566
8
8007170344"
50-566
S
6007170344*
50-566
S
6007170356
50-566
S
8007170356
50-566
S
B00717035B*
30-566
S
800717035B*
50-366
S
8007170313
50-390
S
B007I70313
50-390
S
B00717052S*
30-370
5
8007170335*
50-390
S
00071 70S tO
SO-260
P
SD07 170591
50-390
8
8007170591
50-390
8
B007 170664
50-338
e
B007 170664
SO-328
5
B007 170664
50-32B
S
BD071B0301
50-296
S
BOQ7180314*
50-296
B
BOQ7IB0323
50-259
Q
B007210036
30-337
0.
8007310036
50-327
Q
B007210036
50-327
0
8007210036
50-327
Q
B00721009I
80-259
a
8O072 10091
50-239
0
B0072 10091
50-259
a
SO07210103
50-239
a
8007210103
50-239
a
BQ07210461
30-327
8
8007210475*
50-327
8
6007210596
50-337
Q
8007220236
50-5 IB
Q
8007S20342
50-299
R
0007230343
50-239
R
8007220342
50-259
R
8007220346*
50-259
R
S007220346*
30-239
ft
B007220346*
50-259
R
8007520358
50-327
R
8007230360*
50-327
R
8007220376
50-259
P
8007220376
50-259
P
B007220376
50-239
P
8007220377*
50-239
P
B007220377*
50-239
P
8007220377*
50-259
P
8007220443
50-239
R
8007220443
SO-259
R
8007220443
SO-259
R
8007220450
50-533
5
8007220460
50-327
A
8007220462*
50-259
R
8007220462*
50-259
R
8007220462*
50-239
R
B007220469
50-327
8
B007220474*
50-327
S
B0072204BI
30-239
H
80072204B1
50-259
R
8007220491
50-239
R
8007220491*
50-239
R
8007220491*
50-259
R
8007220491*
30-239
R
8007230522
30-259
Q
S007220322
SO-239
0
8007220322
30-339
Q
6007220332
30-327
P
8007220968
30-327
9
8007220374*
50-327
8
8007230233
50-566
S
8007230235
50-366
S
8007230403
50-327
P
8007230408
50-327
P
B007230431
50-329
S
8007230449
50-259
S
B007230452*
50-259
S
8007230467
SO-327
P
B007230467
30-327
P
B007230470
30-239
S
8007230474*
50-239
S
8007230477
30-327
P
8007230477
30-327
P
8007230430
30-327
P
AUTHOR ACCESSION
(XFFILIftTION NUMBER
SUBJECT
CATEGORY
6007230430
30-327
P
B0072304ain
30-327
P
BQ072304B1«
30-337
P
B007230486
30-329
S
BOQ72304H7
30-390
S
8007230487
50-390
G
SO 072304 90
30-259
B
500723049111
50-259
S
SO 072304 94
50-32 B
Q
8007230499
50-327
F
8007230305
50-390
S
8007230SO3
30-390
3
0007330511
50-327
A
0007230323
30-259
5
8007230529
50-3 IB
S
8007230331(1
30-237
S
8007230333
50-337
P
8007230333
SO-327
P
8007230575
50-327
F
8007230373
50-327
F
80072303B2
30-390
0
0007330587
30-390
S
0007230397
30-390
8
H007B30591*
30-390
S
B007230591"
30-390
B
BOO 73307 26
50-239
Q
B00723O726
30-299
Q
BOO 72307 26.
50-259
a
8007210279*
SO-SJfl
a
3007240455
50-259
S
8007250414
00-337
B
8007250416*
30-327
B
00072304 [3
30-327
a
8007350436
30-327
8
HQ072S04'??"
30-327
B
B007250SB5
40-1341
B0072303'76
SO-259
Q
8007250396
SO-2S9
Q
80072505"? &
50-23"?
Q
8007280001
SO-327
P
8007aaoooi
30-327
P
6007230468*
SO-239
a
B0072B0468I
50-239
Q
0007290466*
50-259
Q
8007230496
50-327
0
9007230498
30-327
Q
8007280346
90-327
F
8007230516
30-327
F
BQQ7230615
50-259
a
8007230615
50-299
a
8007280613
50-259
a
B0072906I3
50-239
a
8007280623
50-327
p
8007280633
30-3H7
p
B0072B06AQ
30-433
s
B007290479
50-357
Q
B00729037B
50-327
B
B007K9061O
50-338
8
B007K90633
50-328
S
0007290633
30-327
S
6007290636
30-327
B
8007290639*
50-327
8
BOD7290&46
50-327
8
BQ07290649
30-337
8
B0073906S1
50-327
P
B0072 90636*
•SO-327
8
BQ0729Q657
30-239
8
S0072906B9»
30-327
8
B0072.9066E
50-327
8
8007390664*
50-259
8
B007290665
30-327
8
8007290672*
30-327
a
8007290673*
50-327
8
B007290675
50-327
8
800729067'9
30-327
P
fl007290t79
50-327
P
80073706B1*
30-337
S
B0072906B3
S 0-327
8
8007370693"
50-327
S'
8007270695
30-296
8
8007370702*
50-296
a,
aoo7H707oa
50-327
G
800 72907 IB*
30-327
8'
8007290720
50-260
8)
9007290724
30-327
Pi
406
CORPORATE SOURCE INDEX
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEOORY
aoo7ai;o72a
30-337
P
8007290725
50-439
S
8007290725
50-439
S
BO 07290 726»
50-260
s
SOQ7390734
50-510
s
BQ07290737
30-239
s
BO 0729074 4 •
30-351
s
800729O741?
30-438
s
9007290749
50-43S
s
B0072907S7
50-327
p
BG073907S7
50-327
p
HOC 7290 762
50-327
s
BO 072907 70 »
50-327
s
B007290790
50-327
s
3007270800"
50-327
8
B00729QB10
50-3S7
B
B007390B13
30-390
Q
B0072900IB*
50-327
B
8007270820
SO-396
S
3007270833
50-327
S
B00729-OS27*
30-32X
a
aoo7a°OBS9*
30-276
B
3007290364
50-339
S
B007270927
PR
B007300003
PRM
800730016?
50-438
S
B 007300374
30-327
K
8007300376*
30-327
K
B00730037M
SO-327
K
8007300434
50-327
F
BO 073004 34
30-3S7
F
9007300572
50-359
Q
8007300572
50-239
Q
BO 073 100 56
90-337
0
BOO 73 10067
50-259
Q
B0073 10067
SQ--259
Q
8007310067
50 -299
Q
800731030&
50-259
Q
8007310209
SO-259
Q
9007310300
30-859
(1
6007310333
50-337
P
0007310329*
30-327
P
9007310339
30-259
a
8007310396
50-327
p
B007310396
SO-327
p
Q007310411
50-327
p
6007310411
50-327
p
50073104(3
30-327
p
B007310416
50-327
p
8007310416
30-327
p
Tatjon Exploration Drilling CD . Inc
Q007010129
4O-B723
8007010140*
40-8720
BOO 7O 104 32
4Q-B7EB.
a&07SSOi'74
40-B72B
BO 07280 702
40-B7SO
T»ia« A it M Ujiiv
B00721OSOa
30-59
R
Q007210513*
90-99
R
ao&ra'ioosB
50-57
n
B00729046S
50-128
R
BOO 729047 9*
30-123
R
Texas Ini trumeTi ti, Inc
000707004B
70-33
B0072I0173*
70-33
6007230327
70-33
B007S50115
70-33
80072B0147*
50-367
R
Tei-ai PuBllt Interest R»*sarch Group
8007030095
PR
8007170374
50-466
<J
6007300(14
30-466
&
Tendi Utilities GensraUng Co
0007030346
30-143
0
8007060062
SO-4-J6
B
80070B02B2
50-44S
F
80071 10592
30-443
Q
B0071404S5
90-445
0
80071 -10 &02*
50-445
a
8007160623
50-449
M
8007170196
50-445
a
90071B0346
30-449
A
B007180437
50-449
0
B007210352
50-445
8
80&721047B
50-445
A
0007310328
50-443
0
Teiasi Stats of
B007020577
30-498
M
8007110036
PR
0007170316*
CONTRACT
H007 300373
PR
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEQORr
Tciai. Univ of
8007210320
70-137
The Mucl»«r Rtgulatorij Commission
8007290276*
30-327
0
Three Mile Uland Alert
0007140003
30-287
D
0007140008
50-2B7
0
8007 140009*
90-289
0
8007220001
30-2B7
<J
B007220002
SO-3S9
0
8007250680
90-289
9
6007250689
50-2B7
0
8007290779
30-309
9
Time t/ Frenuency Tachnologgi Inc
8007220224*
MISC
Tqdd Shipyardi
B00724022B
70-1062
Tolvdo Ed I ion Co
8007010294
30-346
Q
8007010434
30-346
8
B007Q10439*
30-346
e
8007010464
90-346
p
BQ07020040
90-346
Q
B007030260
30-346
B
8007030264*
30-346
B
8007090234
30-346
F
8007110391
30-346
B
8007110397*
30-346
0
B0071 10407
30-346
8
B007110416*
30-346
S
8007110418
50-346
S
B007110423*
30-346
B
B007 110437
90-346
8
8007110434*
30-346
8
8007110440
30-346
B
B00711044B*
30-346
a
8007140237
30-346
0.
8007140310
30-346
R
8007140322*
30-346
R
8007130360
30-346
8
B00715036&*
30-346
0
8007150609
90-346
a
8007130670
30-346
p
8007150824
50-346
0
B0071 70064
90-346
Q
B007 170441
90-346
a
8007170450*
30-346
s
B007 170332
90-346
0
8007180271
30-346
Q
80071B0310
30-346
0
8007210216
30-346
0
8007210494
90-346
P
8007320373
30-346
B
8007220378*
50-346
S
B00722Q49B
30-346
B
8007220463*
90-346
B
8007230076
30-346
0
8007230141
90-346
a
8007330200
30-346
a
B007230200
90-346
Q
B0072303B1
90-346
p
8007240028*
90-346
a
B007240126
90-346
s
8007230382
90-346
p
8007290427
30-346
p
8007290434
30-346
p
8007230438*
90-346
p
8007330572
30-346
Q
80072804B3
30-346
P
8007280971
30-346
S
800728037B*
30-346
B
8007280583
50-346
3
80072803B9*
30-346
a
8007280996
90-346
a
8007280602*
90-346
B
8007380609
90-346
a
BQ07200632*
90-346
a
8007200630
30-346
s
BQ072B0643*
90-346
s
8007290500
30-346
a
8007300141
PR
80073 1034B
30-346
0
B0073 10380
90-346
p
8007310936*
30-346
a
raninuc l»ari Inc
8007030011*
70-2470
8007030016*
70-2470
8007030020*
70-2478
B007070018
XPQRTLIC
8007070043
PR
8007070140
XPDftTUC
8007070149
KPORTLIC
CORPORATE SOURCE INDEX
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEGORY
Q007 110469
8007110400
8007 1 30353
9007290023
B007290027
XPOHTLIC
XPORTLIC
XPOF1TLIC
XPORTLIC
XPORTLIC
8007290390
8007290446
6007290452*
B0073104S5*
BQ07310496*
XPOHTLIC
KPORTLIC
XPDRTLIC
70-247B
70-3478
Tramp or tat Ion. Dipt of
Tubtco, Ine
Tulsa Qimmt Ray* 'nc
B007020447
8007140521"
S0072903AB"
80072 90392*
B0072 10200
PR
CONTRACT
OA999
OA999
7 1 - 1 39
Tuioffltij, Latham & Schmitt
Undtrurl ter» Laboratory
Union 76 Mtnirali Eiplorat ion Co
B0072 10209*
BQ072907fll
8O070I0373"
B0070 10305
80072 10S60
71-139
QRO
50-313 F
40-8 9B4
40-8384
Union Cirbld* Corp
SQ072 10566*
80070 SOB 1 9
8007140371
8007170571
8007210293*
40-8584
40-299
40-299
40-299
70-687
B00722QQ2S
BO-072200S6"
8007220064*
8007220074*
8007220091*
HASTE MOT
HASTE MOT
WASTE HOT
WASTE MOT
WASTE MOT
B00722QQS7*
B007280473
8007290145
BO 073 10497
9007310500"
WASTE MOT
XPORTLIC
NUREO
WASTE MOT
WASTE MOT
Union Eltctric Co
6007100379
BOG71S0006*
B0071SOOIO*
8007150534
BQ07210199
30-4B3 A
50-4B3 0
30-4S3 Q
50-483 F
50-433 Q
Union Min*rali
Union of Cane«rnnf Scitntiiti
8007250336
G007020Q38
8007290619
9007010234
BOO70B0090*
SO-4B3 8
40-SBB4
1O-8SB4
one
5O-2B9 0
90071 4002S*
B0072I047S*
B007290012*
8007890781
8007290803*
50-239 0
50-889 0
SECV
ORO
ORO
Unit id Illuminating
Unitld Nucliar Corp
BOO70B0012*
BOO71403BO*
B0071B0879
B0071B02B9
80071B04SO
50-443 I
40-2?9
40-B&B1
4O-8602
40-9699
Unit«l Nuclear Carp ihlaval Products Div
Utah, 8tat* of
8007220063
S007S20070*
B0072B0194
90071B006.6*
BOO7210090
40-972B
40-B72B
MA9TE MOT
70-371
4O-B6B1
Utility Horlur* Union of Am«rica
Valcor Englnnring Corp
Valort, C
Vandirbllt Univ.
B0071O0349
9007160366
B007E50277
B007110112
800709004B
PR
5O-369 3
PT2I
50-372 0
PR
Vtrmont Eltctric Cooper*tiv»r Inc
Vermont Yankit Nuclaar Pouiar Corp
80070B0028*
BOO7010317
BOO70 10391
8007010397
B0070104O3"
50-443 I
30-271 8
50-271 S
5O-27 1 I
5O-271 B
8007070247
8007070260
8007070346
B007080292
90O7030296*
50-271 F
30-H71 S
30-271 P
50-271 Q
50-271 0
8007 11 0460
80071 7032 S
8007180393
80071 B0400*
80071BOS49
50-371 0
5O-371 0
50-371 R
50-271 R
SO-271 0
9007180394
8007210448
BOO7BI045A
8007210467*
B00721057'9
30-271 Q
30-271 H
5O-27 1 R
SO-27 1 fi
SO-27 1 0
AUTHOR
AFFILIATION
ACCESS 1 01-1
NUMQER
SUBJECT
CATESORV
30Q72304B8
50-271
S
9007230469*
50-271
S
9007230695
50-271
a
B007250173
50-271
a
BOO72SO1HB
30-271
a
B0072504aa
30-271
p
8007280661
50-271
F
BOO731O3BS
50- 37 J
p
Vermont. State of
80071 10101
PR
Vet rtdnin HOBD Horthpor ti NV
8007070112
8007010340
PR
30-3BE
s
3007010353
8007010'363
30-339
30-401
B
A
S0070iO'37S»
50-339
S
80070i(>391»
so-aai
B
8007010399
30-339
S
H007010413
90-33B
0
8007010415"
50-339
S
00070 104S2
SO- 280
p
BU07010422
90-SBO
p
B007010432
so-aao
p
8007010429
so-a-ao
a
H007010fl30
so-aao
p
8007010430
90-EOO
p
HO 0701 0430
so-aao
p
BO 070 10 430
90-230
p
BO 070 10443*
50-280
0
BO 07020 001
71-5957
B0O7020456
50-338
p
B00702Q5H3
PR
B007020592
30-33B
p
8007020398*
90-339
p
B00703007S
PRM
8007030131
90-aat>
p
8007030131
so-2ao
p
8007030133*
30-280
p
B007030133*
50-280
p
60-07030 1 S 1
30-339
p
8007030136
50-339
p
8007030184
50-280
F
Q0070301B4
30-200
F
BOO 703026 2
50-339
8
B007030263
30-338
B
BOO7030267*
50-339
S
8007030267"
50-33B
8
8007030270
30-338
B
8007030371*
30-338
B
8007O30273
30-339
B
9007030275*
30-339
B
80070302B1
50-339
B
0007030203*
50-339
S
80070302B3
30-339
B
3007030283*
30-339
B
8007070200
50-339
E
8007070201
30-339
P
8007070224
50-280
B
8007070229-
30-280
S
B0070703S3
30-338
a
B007070293
50-336
Q
80070703SB
30-339
8
BQ07070363*
30-339
a
B007070373
30-338
8
B007070374
30-339
ts
8007070379*
S 0-339
S
B0070703B1*
30-336
B
B0070703B9
SO-280
8
B007070397*
SO-2BO
B
B007080069
3O-33B
P
S007080Q72*
90-338
P
8007090419
50-2BO
P
6007090057
30-280
Q
B007090057
50-2BO
0
B007090057
SO-BBO
a
8007090057
SO-SBO
Q
8007090296
&0-339
8
8007090304*
30-339
8
8007090309
50-339
S
8007090312*
SO-339
8
8007090317
30-339
9
80070903E3*
90-339
3
8007090335
S 0-339
8
B00709034H*
3-0-339
S
B00709031&
30-336
8
8007090353*
50-338
B
B007090423
3Q-SBO
a
490
CORPORATE SOURCE INDEX
AUTHOR ACCESSION
AFFILl/lTiaiJ NUMBER
SUBJECT
CATEGORY
8007090423
50-2BO
a
8007090423
50-2BO
0
80Q7IOOI5?
50-339
P
8007100273
SO-2BO
P
BQ07IQ0273
50-2BO
P
B0071O0273
50-2 BO
P
6007100373
so-aeo
P
BOO7U0189
so-aao
Q
B0071101B9
50-SSO
Q
BO 07 110202
50-33?
P
8007110300
50-33 B
3
Q007UO300
50-339
3
B007tlO33£i
50-280
0
600711033d
50-280
a
B007U0359
30-339
p
60071 103M
50-339
p
BOO71103A4
SO-339
p
BOO7 110345*
50-339
p
BOO7110370
90-281
Q
BOO7110-)20
50-339
3
6007110139
30-339
P
BOO7140187
30-339
P
BOO71402O9
50-339
5
0007140225*
50-339
S
SOO7 1402-4 f
50-280
S
80071 4025?*
SO-EBO
S
B00714O393
90-333
P
(30071 10393
50-33B
P
B00714040Q*
50-338
P
B0071 10400*
SO-33B
P
8007180106
90-339-
P
B007140411*
90-339-
P
BQ0715D462
50-230
Q
00071 5046?
90-280-
Q
8007150367
90-330
P
8007150969
50-338
P
8007150671
SO-339
0
BQ071506S6
SO-33B
S
8007130701*
SO-33B
a
BOO 7 ISO 76 7
SO-33B
a
6007150777*
50-33B
s
B007 1 SOBOS
00-339
a
B007150B10
30-339
a
B007150S15»
SO-339
S
B00715O317*
30-339
s
B007 160507
SO-339
p
8007160343
50-200
Q
9007160943
50-200
a
B007 160664
30-201
a
9007 1 60671
30-339
p
B00717017S
SO-339
p
B007I701B3*
50-339
p
8007I70IB9*
90-339
p
8007170334
30-200
0
8007170334
SO-280
Q
3007170334
30-260
G
B007 1 70334
30-260
a
B00717034B
SO-2BO
V
B00717034B
SO-2BO
V
8007 170330"
so-aao
V
8007170309
30-230
R
3007J703B9
50-290
R
6007170391'
30-200
R
SQ07170391*
30-380
R
80071 70"! 12
30-2 BO
F
B0071704ia
30-290
F
6007170539
so-sao
Q
8007970529
30-280
a
0 007 170566*
30-260
p
8007170601
50-3 3 B
F
BOO? 1706 01
50-338
F
B0071BOSI9
30-28 1
S
B007IB0327*
30-281
9
80071803^1
SQ-B81
0
---^
50-360
fl
10
s
10
s
10
s
19
p
11
p
19
p
10
p
10
p
11
p
19
p
AUTHOR
AFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEOGH'i'
B00722043I
B007220431
0007220436*
8007220436*
0007220487
30-338
30-338
90-338
50-338
30-33?
n
H
n
p
9007220507
8007220912*
9007220579
8007220579
8007220579
30-338
30-338
50-338
30-338
50-338
i
90072205BO*
8007220902*
8007220382*
8007220601
8007220611*
90-338
30-338
90-338
30-337
90-337
s
F
F
S
S
8007230447
B007330447
8007230493
8007330497*
9007240003
30-338
30-338
90-338
30-338
50-339
o
a
s
a
F
800724004?
8007340092
8007240092
8O072401I9
9007240116*
50-337
30-338
50-338
30-33?
SO- 337
A
F
f
P
P
B007240149
B007250369
B0072B0379
8007250383
6007250393
SO- 337
3O-2B1
SO- 337
50-338
SO- 338
P
a
p
F
F
B0072S03B5*
80072503B9*
6007250388
8007390419
9007290415
SO- 338
3O-33B
30-339
30-338
3O-33B
F
F
F
P
P
60072S0430
8007250545
9007250949
8007230545
8007330949
5O-339
30-280
30-280
30-280
3Q-B80
P
a
a
a
a
B0072B0367
B0072B0379
B0072B0400*
B0072B0406
B0072B0423
30-339
3O-339
SO-339
30-339
SO- 339
p
p
p
8007280432
B007280432
BOO72H0440
0007200444
B0072B0607
30-33B
SO- 338
30-339
SO-339
30-280
F
F
E
S
B0072B061B*
B0072B0629
B007280651
S0072B0651
B007290220
50-280
30-2180
30-338
50-33H
3O-280
B
S
P
P
Q
6007290220
6007290700
B007270700
B007290B3B
B007270B40
30-280
3O-33B
30-338
50-338
5O-2BO
G
P
F
B
a
8007290B40
S007290B40
B007390B40
B007290B43*
BOO 73001 83
50-280
30-280
50-280
30-338
30-339
a
Q
o
e
f
8007300450
900730049B
B007310277
0007310346
0007310384
50-339
SO-339
PR
50-339
SO-339
p
f
p
p
Virginia Tach
B007310390
8007310421
B007310421
80O723049B
B007230503*
30-aBl
30-2BQ
30-aao
50-124
30-124
p
p
p
F
F
VirijInU. Unlv oP
V»ll«nr W J
B0072 10429
B0072 10429
8007210433*
9007210433*
6007080099
30-62
30-62
50-63
50-367
F
F
F
F
G
HAPdRA, Inc
Me Laugh! In
WJMhlnston Public Pouirr SuppU 9«ittm
6007030357*
8007110144
B0070 10002
6007010033*
CONTRACT
50-303
5Q- 397
30-397
1
f
f
CORPORATE SOURCE INDEX
491
AUTHOR
AFFILIATION
ACCESSION
NUHHER
SUBJECT
CATEGORY
BOQ71S06BO
0007160-10?
B00717OS77
8007I7QS77
B007170SB5*
50-397 A
HUR EG
5O-460 S
50-460 S
50-46O 9
8007 170305*
8007 1 BO 329
8007210392
0007330003
B007230007
50-160 5
SO-SOB Q
50-397 A
50-397 0
50-50H Q
8007230623*
B00725Q334
8007250391
8007250541
B00729O105
50-397 Q
50-397 Q
50-397 A
50-460 A
50-508 0
8007290444
S00729OS1B
B00729O704
9007300899
8007300399
50-46O Q
50-46O Q
50-397 S
50-460 0
50-460 Q
B00730O306
B00730O344
8007300544
90O7310171
800*73 1O409
50-50B Q
50- SOB F
50-397 0
50-397 0
50-397 A
Uathlngton State Univ
BQ0731Q49B
B00731O502
BOQ71 10225
S00711O231*
Q00711Q239*
30-397 Q
30-397 0
PR
PR
Pfi
Washington Univ
U**Hngfcon, St*t» of
80O716054O
B0071B036B
60071 SO 151?
6007310113*
£3007290049*
50-10 D
SO-1O D
fiEOOD
CONTRACT
State Prog
W«»hlngtoni Univ, of
Wtitirn Canada Hydraulic Laboratories,
Ltd
H«»t«rn Nuel»*ri Ine (iub« of Pheln»
Dotfg* Corp 1
8007290050*
60Q7Q20023-
BQ07070130*
0007070099
9007100091*
State Prog
CONTRACT
50-329 A
40-1463
40-1165
W»»tern Kucliarr Inc
Utitlnjhouie Electric Carp
B00714.0S49
0007220314
aoo624ooei
flOO701Q003
B007010079
PR
40-1162
40-1162
PR
FOIA
B0070 10102
B007020221
300702064 1
0007020644*
0007020658
XPORTLIC
70-1143
TOPflEP
TOPREP
XPORTLIC
BOO703Q012
B007070023
B0070700Z4*
BOO7070041
B007070125
PR
XPORTLIC
XPdRTLIC
XPORTLIC
XPORTLIC
BOQ70B0371
BQ07100191*
80071QQ253
80O7 100236*
80O71O0263
50-339 P
PR
TOPREP
TOPREP
XPORTLIC
6007100271*
BOO7f00358
B0071O0370*
000711008!
8007110492
XPORTLIC
PRM
70-115!
XPORTLIC
Pfi
6007110522
BO 07 14034.7
B00714Q379*
BOOT 140407
8007140416*
PRM
TOPREP
TOPREP
TOPRGP
TOPREP
B0071 40420*
B0071 40340*
B007I 50646
B0071S0652*
9007150656*
TOPREP
ACHS
TOPREP
TOPREP
TOPREP
B00716016B*
B007160743
B007 16Q75S*
8007160763*
S007 170230
QM11
TOPREP
TOPHEP
TOPREP
50-293 S
BO071702S9*
8O071B0357
0007180449
BECV
50-244 P
XPORTLIC
AUTHOR
rtFFlLlAI IQ11
ACCESSION
I4UHQER
SUQJECT
CATEQOJ11
V
80071 804S5»
xponrtic
8007100504*
TDPREP
8O07 100565
70-113b
B0073 10077*
70-115!
B0072 10297
70-1143
BQ07220496*
TOPREP
3007250-560
XPORTLIC
a0072300IS«
70-134
HO 07240094,
71-5450
B0072506B5
XPORTL1C
a0072B0373
XPORTLIC
S0072B0479
50-594
A
S0072B0495*
90-59fl
A
8007290667*
30-454
K
B007310Di,9
XPORTLIC
BOOV3 10073*
XPORTLIC
Wsiting house Electric Corp • Nuclear
6007020590
TOPREP
Energi) Sij items
B0070S099i>'
TOPHEP
B007140373H
TOPREP
600732048011
TOPREP
S0072a0499»
TOPREP
B0072E0503*
TOPREP
West inghfluse Elp-ttric Corp • PUR Sijstems
B0063000I7
70-1151
D.v
BO 063 00292
70-1191
B007210410
TQPREP
HestlnflhOuie Operating Plants Ouiners
9007220482
TflPREP
Group
Uharton I Pogdl i BS
B007U0034*
SO-361
Q
Will tej M P Cc-nitiltlng Engineer
B0072 10029
Acna
Widoffr Reager, Selkouilti '- Adler
H007 1 ^10003
30-389
a
a00714000G
50-3B9
Q
B007HJ0001?*
50-2B9
o
B007 220001
50-339
o
B007 320002
50-289
a
8007220585
50-309
c
8007350680
30-2H1?
o
8007250609
30-3B9
o
800739077?
30-SB9
o
Hint ami College, llasiachus afcts
8007100137
REOQD
Will lam-s-Roli Inette d Aasociatea. Inc
BOO 7 240021
40-1163
Ulsconsin Electric Power Co
B007010030
SO-266
Q
8Q07Q10030
50-566
a
0007010036
50-3OS
a
8007010043
50-846
a
8007010062
50-266
a
BOO 70 100 63
50-366
a
80&7Q10'109
50-266
3
H007010420*
50-266
3
Q007020340
PR
B007QB03B1
50-301
•3
0097080394*
50-301
3
3007090330
50-301
p
B0071 10317
50-305
a
BOO7110326X
50-30S
B
8007110333
50-366
S
8007110340*
30-266
a
6007110343
50-301
Q
600711034911
SO-301
s
8007110353
50-301
B
S0071 10357*
50-301
S
B007140559
PR
H00715Q610
50-266
R
800713061B*
30-266
R
H00715061B*
30-246
n
B00715064H
50-266
p
B007 1 50&4B
50-S6&
p
8007190653
30-266
p
B007 I 906B2
30-266
t*
B0071506S2
50-S66
p
90071 £.0757
50-266
n
B007160757
50-266
<j
90071 70B?6
50-266
0
6007170526
30-366
0
BO 0721 01 OB
50-266
i'
a007210408
50-266
p
8007SI043S*
30-266
p
SO 072 10 438*
30-266
p
8007210432*
50-266
p
BOOV210460«
50- £66
p
B007210465«
30-266
p
8007210469*
SO-2&6
p
|
H00722007]
30-266
n
BOQ7230H03
30-503
9
492
CORPORATE SOURCE INDEX
AUTHOR
AFFILIATION
ACCESSION
NUHHER
SUBJECT
CATEOGRY
BOO 7240312
50-266
Q
B007240342
SO-24A
Q
9007000035
PR
BQ0730G3B1
50-366
G
B0073 00430
50-3O1
Q
8007300410
50-266
F
8007300440
30-266
F
B0073Q04Si>
50-266
Q
UUcoeisin Public Service Corp
8007020032
50-305
a
B007020256
50-305
0
B00702071&
50-305
Q
8007030206
SO-30S
P
3007090356
SO -305
S
9007090390*
SO-309
S
3007140464
30-305
3
3007140474*
50-305
S
8007140469
50-305
S
8007140302*
30-305
9
BQ07140510*
30-305
S
8007140344
50-305
R
800714054B9
50-309
ft
9007220239
50-305
P
8007240321
50-303
Q
90072^0334
50-303
a
B0072404L3
30-309
a
B0072G0414
30-305
F
80072B06fa9
30-305
s
S0072BOf>74*
30-305
&
90072B0675
50-303
s
QQ07280&B5H
50-305
B
Ulsconiln'i Environmental Decade
C007330i07
30-266
O
G 00728 0477
30-301
0
6007310373
50-3A6
H
Uliconiln, Statr of
6007110357
PR
B 007 1104 02
PR
6007140408))
PR
B007I40417"
PH
8007140338
PR
S007IS0337
50-40?
D
Wi-iconttni Unlv gf i Mad lion
8007310403
9Q-IS(.
R
6007310405*
30-184
R
Wm Mar»li Riet -Unlv
B007310231
HUREO
Molftjeln,Ei L
8 007030346*
CONTRACT
Wolivor, J »
8007220S6S
50-353
0
Wooduard-C lyde Consultantl. Inc
60070 50344"
50-36 1
A
600706000 3«
90-341
A
00072504 00»
50-3?7
rt
B00723D402*
50-397
A
80072S0403*
50-397
A
Won ham, f'orsijtha & Gampvli
SO 07 1 406 E 5
50-443
M
Hi|Je Laboratoriei
60073 10247*
FGJIA
Wyominj Mineral Carp
G0070I0214
40-8SB3
B007010391
40-8302
B007020079
40-B302
BOQ7Q30358
40-8302
BO 07030363*
40-B503
SO 07030364 r
40-8302
SO-07070147
40-8502
8007150644
40-0502
BO-0715065U
40-B502
80071 506S7*
40-BS02
B007IS0467*
40-3302
8007210095
40-B502
8007210101
40-8302
B007210I91
10-8302
AUTHOR
.YFFILIATION
ACCESSION
NUMBER
SUBJECT
CATEGORY
B0072 10542
40-9302
BOQ721034B*
40-3302
8007210553*
40-B502
8007220303
40- B 304
9007220310*
40-B3W
B007220315*
40-8304
B0072B0200
40-SS02
Wyoming Outdoor Council
S0071701Q6
40-6745
BQ07220920
40-1142
Uynmin9« Stat* of
BOQ7010SA7
40-B3&4
B007Q20064
40-8497
BQ070200B3
40-Bi97
B00702043B
40-B731
BQ07020694
40-B3Q2
8007030219
40-B3BO
8007030224
40-8745
8007030332
40-810?
80070701 IS
40-838-0
S007070120
40-8303
8007210063
40-B697
B0072 10066
40-8502
B0072B0034
40-BS02
B0072B03Q3
40-BS02
Yale Unlv
8007020464
PR
Vattkc* Atgmlc Electric Cd
S0070100S7
50-29 Q
6007010403
Pft
B0070 10404
90-29 1
B007020307
PR
B007020313
PR
B007020329
PF1
8007020693
PR
80070702Q4
50-29 S
8007070407
PR
80070B0079
50-29 P
B0070B0310
50-39 F
8007090233
30-29 F
B0071IOS29
PRH
B007 140030
PRH
0007140300
30-29 P
B00714033B
30-29 P
B007 140701
NUflEE)
8007 ISO 143
PR
8007170116
30-29 Q
80071 703.62
30-29 Q
B0071B0097
50-29 Q
B0071B0144
50-29 Q
B0072 10002
SO-39 Q
B0072 10399
30-29 R
BQQ7B10403*
SO -29 R
B007210S06
50-29 0
80072SQ273
30-29 0
800725027B
80-29 Q
80072BQ439
30-29 P
80072B0439
50-29 P
B0072B0492
30-39 F
B007280SB6
50-29 P
8007280621
50-29 P
80072B06S6
30-29 4>
8007300009
PR
8007-310464
PR
C-flruiay Carp
8007010029*
QA999
Co i-lii PA
BQ07220Q33*
30-299 H
0007300012*
50-320 H
Eimmir Ann Cftlren* - Tinner Art*
BQ07UC094
30-359 0
Citllln* of KY
e subject category column In this index gives the docket
mber and the symbol for the category of information
tnin that docket; for example, 50-320 P. The docket subject
tegorles are defined in Appendix A.
tiject categories for nondocketed items are also entered
*hls column by symbol; for example, ACRS. These eate-
ries are defined in Appendix B and listed in the Contents.
An asterisk following the accession number in this index
indicates that the document is an enclosure to another
document. To obtain the accession number of the principal
document under which the enclosure Is listed, refer to the
index entitled "Cross Reference of Enclosures to Principal
Documents."
REPORT
NUMBER
ACCESSION
NUMBER
SUBJECT
CATEGORY
OTHER REPORT
NUMBER
111-017-02
11600 OS
21 A AOSA
34A93 Rl
44-ITL337
8007220372*
B00723046S1
B007S 10233*
9Q07S104Q4*
B007O20t3S»
50-70 P
30-32S A
TOP REP
30-437 A
HASTE MOT
1&569
•U2SO-1
BO-flD-IOO
90-RD-IOO
B00313O44B
H 007020011
8007310269*
8007010226*
8007100246*
BOOS13Q44S
80070200 U
FOIA
50-206 R
30-206 R
RE9
RE9
a 0070200 16
B007O2008S
BOO7O203S6
8007020364
SQO7O30013
B007020QI6
B007O200BS
B0070303S6
8007020364
B00703001S
RES
fl£3
RES
RES
RES
BNL-NUREO-27461
ORNL/HA8RD-79
BNL-NUREQ-27S9S
00071 1O148
9QQ71 10581
B007I40031
BOQ714OO44
8007140303
B0071I0148
8O071 10351
B007 140031
B007 140044
8007140903
RE9
REB
RES
RE3
RE9
ORNL/HASRD-S1
ORNL/HABRD-&2
ORNL/ED/EI8-131
8007 MO 307
8007140634
B007 1 40642
BQ07 150016
3007180039
8007140507
800/140634
S007140&42
0007130016
B0071 30039
RES
REB
REB
RE9
RES
ORNL/hfASRD-93
NRC-04-74-190
OHNL/FTR-SBO
EOO-CDAP-5144
3007130066
8007130407
80O71SO409
8007160290
B00717O460
0007130066
S007IB0407
9007I3040S
(3007 160280
8007170460
RES
RES
RES
RES
RE9
EEC-LOFT-B16S
NHC-04-74-190
BQ0717O648
900718Q233
BOO7IBQ24Q
3007190245
BO0718G253
800717064B
80071BQ233
8007160240
8O0718Q24S
B007 180233
REB
RE9
REB
RE9
RES
ORNL/ED/EtB-130
BQ0718O330
8007180332
800/180354
S0071B0361
9QO72 10001
B0071S0330
B007JB03S2
80071 3039 4
80071B0361
9007210001
RES
RES
RES
RES
RE9
ORHL/HA9RD-77
ORNL/ED/EAS-SO/
80072IQ003
9007210003
8007210007
80O7B10010
8007210014
8007210003
B007210005
B007B10007
0007210010
8007E10014
RE9
RES
RES
RES
REB
9007210017
000721 O602
90 0721 0607
BQ0722Q03B
9007820043
8007210017
0007210602
B007210607
0007220036
B007220045
RE9
RES
RES
30-263 P
RES
EOO-l.OFT-3172
EOO-EA-Slfl6
EOO-LOFT-5192
B007220047
8007220093
8007220059
8007220063
8007K30172
B007B20047
B007220053
8007220058
8007S20063
8007230172
REB
REB
RES
RE9
30-334 P
GNL-NUREQ-27591
BNL-NUREO-27739
EOO-CDAP-3173
E08-EA-S174
REPDRF
NUMBER
ACCEBSIOU
NUHBER
SUBJECT
CATEQOR1
OTHER REPORT
t NUMBER
80072301 77
900 72301 B5
9007230194
900723Q223
8007230331
8007230177
9007 230 IBS
9007230 1 ?4
00072302 83
9007230231
RES
RES
REB
RES
RES
LD-MR-OOS
RE-A-80-044
RE-A-BO-047
B007240ZS7
BO 07240294
0007250136
BO 07250306
9007280002
B007240257
Q00724O294
B007E901B6
600725O306
80072S0002
REB
REB
30-313
30-339
REB
P EQQ-EA-sm
P EOO-EA-S1"?7
90072B0004
8007280091
B007280092
6007280095
90072B0164
8007280004
BD072B0081
B0072B0093
B007280093
80072BO1&4
RE9
RES
RES
RES
REB
4441 /ML- 13
ORNI./FTR-939
onNL/HAGRO-B4
EOO-TFBP-S043
9007280171
9&072B0174
9007260179
S00728019A
80072901 &3
8007280171
900728017'!
BO 07280173
B0072B0186
B007390I63
RE9
REB
RES
REB
50-324
UO-MR-007
LTR 141-109
EOO-CAAP-3191
EOO-CAAP-8I90
P EOQ-EA-319B
B007290174
90072901SO
8007290191
8007290201
9007270226
600729O174
800729 01 BO
8007290171
8007250201
9-007290326
RES
RES
RE9
REB
RES
EOO-TFDP-Tn-S02
USNflC-P3?4
USMRC-P394
EO(J-CAftP~31B?
9007290233
B007S90241
9007290246
B0073101B1
9007310183-
B007290233
800729O24 1
B007290246
90073101B1
B0073101B3
RES
RES
RES
REB
HE s
B0073101B7
9007310251
B AW- 1621
DAW- 1623
BAW-31B A12 RIO
0007310197
B007310231
900709020 1 *
9007240002*
B00701OOIO*
RES
RES
TOPREP
TO PREP
7O-924
O'-NL/HABR^
BAW-381
CEN-119<B>-!iP
CEN-12MB)-HP
CEN-124<B)-NP PT1
B0070203301
9007090332*
8007090341*
B0070903S2*
B007090361*
70-B21
30-317
30-317
30-317
&0-317
P
P
P
f
CEN-124IBI-NP PT3
CEN-133(B>
CENPD-IS3-NP Rl
CENPD-1B3 Rl
CENPD-2SS HI
90070903681
9007090346*
9O071 10249*
8007100212*
B007100220*
50-317
30-317
TOPHEP
TOPREP
TOPREP
P
P
LD-BO-03S
EDAC-117-233 01 Rt
EDAC-117-253 01 Rl B
EDAC-117-233 01 Rl S
EDAC-117-233 02 Rl
EDAC-117-25B 01
6007280606*
900722O362*
90072S036M
8007220356*
9007220369*
TOPREP
SO- JO
50-70
50-70
90-70
P
P
P
P
EDAC-117-238 02
EE-46-0004
EODP-E3E-15 R2
OAI-TR-106 R2A
I-B 77-11-07
BOQ7220333*
90072B0652*
9007140373*
8007070106
9007140-051*
30-70
50-267
TC1PREP
TOPREP
PR
Q
493
494
REPORT NUMBER INDEX
REPORT
NUMBER
! ACCESS I DIJ
NUMBER
SUBJECT
CATEGDFJV
OTHER REPORT
NUMBER
ISDN 0-99440-IOi-l
J231
NAC-E-B01 Rl
NEDD-34701-1
NUfiEO-0030 V3 N02
9007140046*
8007220317"
B007300001
B007220334*
BOD7240363
PR
40-1 142
71-fi6"!a
TQPREP
fJUREO
16747
16934
CREARE-TN-307
NUREO-0304 V4
NUREG-OS6I Rl
MUREO-0597
NUttEG-0662 VS
NUREG- 06£>H DRFT
8007310004
B007O30374
B007030373
B007 180007*
B00710D361?
tJUREO
KU«EG
lil/REQ
50-330 P
NUREO
NUREO -0£7S 39
MUREG-068Q
NUREO -OfiSS
.NUREG -0687
NUnEG-0694
S007I10036»
9007 1 1 OS60
6007-0 900 17 *
B0071 70440*
BOO 7220369
50-375 E
KUHEO
SECV
40-8745
KUHEO
NUREG-069B
MUREO-13B5
NUREG/CH-020B Rl
NUREO /CH-aSQ9
NUREG /CR-0370 V2 APP
3007280037
8007160049
B007I00363
B007570H5
8007240283
30-320 P
NUREO
NUJ1EO
NUflEG
NUREQ
3AHDHO-7027
flNL-CT-?a-37-a
V/DM-128
NUREG/CR-0742
NUREG/CH-0743
riUHEO/CR~OB30
NUREO/CR-1100
NUBEO/CR-111B
9007310331
90072902SI
O007H200I9
E 0072 10498
8007320034
NUREO
NUREO
Nuneo
30-347 P
UWEQ
8AND78-7017
SAN 079-0 369
PNL-3022
DRNL/NUREO/TM-3
UCRL-52742
NUREO/CR-II1-9
NUREQ/CR-II69 V3
NUREG/CR-119'1
NUREG/CR-1195
Nl/REO/CR-1198 VI
B0073 10225
8007)80072
BOO7310007
B0073'?0ai7
B0073I&241
NUREO
NUREO
NUREO
50-234 P
NUREG
4299
UCRL-32730
SAND79-1787
EN1CO-EO23
BAHD79-2378/1
WmEG/CH-1309
NWEO/CR-1234
WlJlEG/CR~iBS3
NUHEG/CR-iaSfl V2
NUREG/CR-1260
8007310019
8-0 07220024
000717031 1
8007140*17
BOO7300041
50-2 1 9 P
NUREO
NUREO
NUREO
NUREO
yCRL-52744
PNL-3236
UCID-1B123-79-4
ORNL/NUREO/TM-3
NUREQ/CR-1289
NUREG/CR-1295
NUREG/CR-1301
NUflH»/CR-13Jd
NUflEO/CH-1357
0007310216
0007310246
9007310210
BOO703033Q
BOO 731 0234
NUREO
NUREO
NUREO
NUREO
NUHEO
BHL-NUREO-5tl43
ORNL/NUREG-6.3
PNL-3373
PNL-32B8
BNL-NUnEQ-SU37
NUREO/CR-1361
NUREB/CR-1396
NUREO/CR-14L3
NUREO/CK-U25
NUfiEO/CH-l-tS?
BOO 7230625
80072901 S3
80O71BOOiS
Q0073IOSS5
8007310217
WUREO
NUREG
NUREO
NUREG
NUREO
£00-2025
fiANDBO-0020
OHNL/NUREO-70
£00-2032
BNU-NUREO-511B7
NUREWCR-1440
NUREOfCR-ma
NUHEOrt:R-t459
MUSEO/CR-HiO
NUREO/CR-H6J
SOO72BOSOB
S007B30205
B007I 40092
aoo7iaoo3i
B007140610
NUREO
NUHEO
NUDEG
NUREO
NUREO
EOO-EA-S153
EOO-EA-S153
EOO-203B
ANL-BO-43
ORWL/UUREO/TM-3
NUREO^CR-1477
NUREOYCR-1483
NUREff/'CR-14a6
NURE-fr/CR-I 499
NLTRE«/CR-1SOO
9007310554
30O7300S7S
9007^40409
B007»40fl7fl
(1007310491
NUREG
NUftEG
NUREG
NUREO
NUREO
OflNL/NUREO/TM-3
DHNL/NUREO/TM-3
UCRL-5274i
NUREG/CR-JSOpl
NUREO/CR-1312
HUREO/CR-J3I3
NUREO/CR-lSaO
NUHEO/CR-JSSO
Q0072104S9
90071 706 tB
8007310471
9007310009
B007EBO&B3
NUREO
NUREO
NUREO
(JUREO
NUREO
ANL-90-47
ATR-80<7ei'l)-l
BNL-HUREO-Sia(9
EGO-2043
EOO-204S
NUREO/CH-15S3
NUREO/Cfi-1559
WUREOyCR-1557
HUfiEG/CR-lseff VI
«uaeo/cR-isBt> vs
a007090371
30O7530SOI
6007240394
6007090.166*
600 7090 J 67*
NUREO
NUREO
NUBEO
NUREO
NUREG
ORNU/NUREO/TM/-
BHI-2064
BMI-2039
NUS-3544
NUS-33S2
NUS-33-74
NUB-3S9S
ONWI-16
60072201 11*
B 007220036*
6007220032*
80072S0101*
8007300249
WASTE MOT
WASTE MOT
WABTE MOT
HASTE HOT
PR
lt,693
16693
16693
16673
II 1-016
REPORT
NUHDER
ACCESSION
NUMBER
SUBJECT
CATEGORY
OTHER REPORT
NUMBER
ORQ-4207-I3
PNL-2B82
PNL-334O
PNL-334O
8eCY-75-429
9007290475*
8007300113
8007090186*
0Q07S10315*
B0070B0036
30-128 R
Pfi
70-1257
70-1257
FOIA
11-182
UC-11
UC-11
BECY-79-106
BECY-79-299
SECY-79-371A
8ECY-79-424
SECY-80-107A
800711054B
B007 100098
B00702024B
B007H0121
B007 1 60786
BECY
BECY
BECY
BECY
SECY
SECY-90-107B
BECY-aO-132C
8ECY-90-132E
8ECY-80-1B3
SECY-90-IS3A
8007110484
S007 160012*
8007180004
8007070398
8007140576
SECY
30-320 P
30-320 P
SECY
SECY
9ECV-BO-171
BECY-80-101
SECY-60-2SO
SECY-SO-230A
SECY-80-242
B007 100264
8007 I 70033
8007110532
8007090033*
B007230179
BECY
30-320 P
SECY
lOCFfi
BECY
sECY-ao-ar-i
BECY~aO-275
8ECY-ao-R7S
8ECY-90-278A
BECY-BO-Z75B
8007250019*
B007090015
B0071400S9*
B00714003S
8007170604*
10CFR
8ECY
BECY
SECY
10CFR
8ECY-BO-27B
SEcv-BO-aea
SECY-BO- 291
BECY-HO-294
SECY-aO-279
8007290176
S007140182
8007290002
B007 140532
B0071500SO
BECY
SO-B47 P
BECY
SECY
SECY
43FR 48621
BECY-80-299
BECY-80-301
BECV-BO-306
SECY-00-307
SECY-BO- 30B
B007290023
B007 140339
8007150069
8007150034
B0072B0062
SECY
BECY
SECY
SECY
SECY
SECY-BO-313
8ECY-80-316
SECY-BO-317
SECY-80-318
BECY-R-74-093
8007380096
8007210009
B007170244
B007 170323
8007020270
SECY
SECY
SECY
SECY
SECY
BECY-R-74-132
BO-07
TIS-6171
TR-3193-I
TR-3BB7-S Rl HOI
8007020262
8007300007*
80070B0285*
80071 00 18B*
8007310387*
SECY
ORO
TOPREP
PR
30-329 A
SQ-BO-07
URCL-13172
VEP-FHD-3S
WCAP-8IB3 R9
WCAP-83B7 Rl
WCAP-8SB7 R2 91
B00703020B*
B00702039B*
B007100256K
8007130636*
B007160765*
30-293 P
30-338 P
TOPREP
TOPREP
TOPREP
SAN-L-BOI?027
EODP-ESE-10
EODP-ESE-4
HCAP-9597 91
WCAP-95B7 S2
HCAP-aSS? 8H-E02A
WCAP-BSB7 82-E04A
WCAP-9S97 B2-E10A
B007 140420*
8007140379*
B007140416*
8007160733*
B007150632*
TOPREP
TOPREP
TOPREP
TOPREP
TOPREP
EdDP-EBE-2
E15A
WCAP-9570 HI
WCAP-9744
WCAP-9719
WCAP-97B4
HMTP 11 21 RO
8007020644*
8007230499*
B007020S96*
8007220503H
80072I0452»
TOPREP
TOPREP
TOPREP
TQPREP
50-266 P
UMTP 11 HI RO
WMTP it 22 RO
WMTP 11, S3 RO
Y1003JOIA12
B0072 10460*
8007210465*
8007310469*
8007170374*
30-266 P
50-266 P
30-266 P
30-2iO P
Items listed as enclosures are those indicated by an asterisk
following the accession number in the indexes. The second
column gives the accession number of the principal docu-
ment under which the enclosure is listed. Knowing the
accession number of the principal document, the date
issued, and the category enables locating the title listing of
the enclosure.
The subject category column in this index gives the docket
number and the symbol for the category of information
within that docket; for example, 50-320 P. The docket subject
categories are defined in Appendix A.
Subject categories for nondocketed items are also entered
in this column by symbol; for example, ACRS. These cate-
gories are defined in Appendix B and listed in the Contents.
ACCESSION NUHHER
ACCESSION NUMBER
ENCLOSURE
PRINCIPAL
DDCUt*ENT
DATE
ISSUED
SUBJECT
CrtTEGOflY
BOG5090524
8005090523
80/02/26
PT9
BOQS090327
SOQ3090S23
ao/03/36
FT)
8005090329
BOQ3090333
80/03/26
PT9
8003890607
8005390603
BO/03/07
PT9
BOOB290&12
8003290603
BO/O3/07
PT9
80032904,16
BOQ3B90603
BO/O3/O7
PT9
BOOM 1073?
B0061 10736
80/04/24
37-10
BOQ6200O71
B006300066
BO/03/33
SO-4B9
O
B006340082
B0062400G1
BO/03/2Q
40-1163
B006B60143
B006S60143
BQ/O6/10
30-2B9
P
8006300115
HOO6300097
BO/03/33
ACHS
80063.00 13B
BOQ63Q0114
80/09/14
30-339
Q
BOQ630030H
BOO63D0373
BO/06/27
30-4 It
F
8006300304
8006300373
BO/O6/27
SO-416
F
B0070 10004
8007010002
BO/O6/16
30-397
A
B0070 10007
OOQ70 10002
BO/O6/16
30-397
A
60070 10OOB
00070 10003
BO/06/09
30-237
P
B007010O10
BOO70 10006
BO/03/25
70-B24
B007010011
BOO70 10003
BO/O6/O3
60-337
P
OOO7010O17
BGO7010013
80/06/10
ono
BOQ701001B
BOO7010Q02
BO/06/16
30-397
A
B007010D81
8007010002
80/06/16
30-397
A
B0070 10023
B0070 10002
00/06/16
30-397
A
9007010029
80O7010013
BO/06/17
QA999
60070 10O32
BOO70H0003
BO/Q6/16
30-397
A
B007010O33
B0070 10003
00/06/16
30-397
A
BO0701 OO34
BOO7010013
BO/06/ 17
OA^9?
8007010030
BO 07010002
BQ/06/16
30-3?7
A
8007010039
B007010013
BO/O6/17
QA999
8007010041
B0070 10008
BO/O6/16
30-397
A
BOQ701QQ43
SO 07010002
BO/06/16
30-397
A
60070100*6
8007010031
80/06/16
SO-S4&
H
9007010049
800701000Z
BQ/O6/16
30-397
A
8007010091
0O0701001&
80/06/17
QA999
BOO70 10032
B0070 10002:
80/06/16
30-397
A
B007010034
B0070 10002
80/04/16
30-397
A
B00701003S
00070 10031
SO/06/16
30-346
H
B00701003B
BQ070 10002
SO/06/16
30-397
A
BOO701 0039
60070 10002
80/06/16
30-397
A
B0070 10060
8007010047
SO/06/O9
40-2674
B0070 10061
8007010002
BO/06/16
30-377
A
BDO7D1OQ64
8(107010002
00/06/16
50-397
A
B0070 10067
8007010047
BO/06/O9
40-2671
90070 1O069
B0070 10002
BO/06/16
50-397
A
B0070 10073
B0070 10002:
BQ/O6/16
SO -397
A
8007010076
B00701000B
BO/06/ 16
30-397
A
00070 10077
BQ070 10047
80/O6/09
40-B674
BOO70100B2
S007010070
80/06/BO
FDIA
BOO70100B3
8007010002
BO/06/16
30-397
A
B0070100B3
8007010047
BO/06/09
40-8674
ENCLOSURE
PRINCIPAL
DOCUMENT
DATE
ISSUED
SUBJECT
CATEGORY
8007010080
BQ070 1 0090
800701 009 1
B007O1 OO92
BOO7010093
8007010070
B007O1000H
B 0070 10 047
0007010003
HOO7O 10070
BO/06/20
BO/ 06/1 6
BO/ 06/09
BO/ 06/16
BO/06/EO
30-249 P
30-397 A
10-2674
30-397 A
roiA
B0070L0095
B0070L0097
B00701009B
900701009?
ao07O101O3
80O7O10O03
BOO7O10O47
80070 10O02
80070 1007O
B0070 10070
BD/O6/16
30/06/09
BO/O6/16
80/06/20
BO/06/2O
30-397 ft
40-3674
50-397 A
50-309 P
BO -249 P
B007O101O6
8007010103
BOO701O109
B007010114
BOO701O117
0007010101
S0070 1 0070
0007O101OS
B007O 10070
BOO7D 10103
BO/03/2B
80/06/20
go/06/ i i
SO/06/EO
BO/06/11
71-376B
P01A
70-143
FBI ft
70-143
BO07010119
8007010131
8007010123
BOO701O)2t
BOO 70 10 133
90070 1 007O
800701 01 Ol
3007O101O5
HOO7O1 OO70
BQQ7O101ES
BO/Ofa/EO
BO/05/B3
B0/06/]l
flO/06/20
BO/06/17
so-a&s i>
71-576B
7O-I43
raiA
State Prng
E3D07O10134
B007O1014O
B00701O14I
QOO701O14Z
BOO701O145
0007010070
8007O101H9
BOO7O1OO70
BOO7010J3S
8007D1007O
80/06/20
BO/03/Q1
BO/06/20
80/06/04
BO/06/20
30-393 P
40-B7B3
50-293 P
ftA999
FOlfi,
B007010147
BO07010U9
8007010131
B007010152
Q007O1D154
B00701013S
B00701O070
8007010139
8007OI0070
BO07O10133
BO/06/O4
BO/Ofi/20
BO/06/04
80/06/20
90/06/01
aft999
FDIrt
Oft999
FOIfl
Oft999
B00701O15B
BOO701O161
B00701D163
eO070101tB
BO070101fe7
B00701007O
B00701007O
B007010139
B007010070
B0070I0133
BO/06/30
BO/06/20
BO/06/04
BO/06 f2Q
80/O6/04
F01A
FDIA
OA999
FO.IA
OA999
S00701016B
BOO7O1O17I
BOO701O17E
B0070tO173
B0070 10176
B007OJ0070
BOO701O133
3007010164
B007010070
BOO7O10O7O
so/06/ao
80/06/04
BO/0 b/ 11
BO/06/HO
BO/06/30
FOIA
OA999
50-333 0
F01A
FOIA
B007010tBl
BOO701O1B4
BOO70101BB
B0070101B7
BOO701O191
B0070 10070
B00701O094
BO 0701 Ol BO
BO07O1OO7O
BO0701007O
ao/o6/ao
BO/O6/13
BD/05/B8
BO/06/HO
BO/06/20
FDIA
7O-2BBS
40-67B9
FDIA
FOIA
9007010193
Q0070 10194
BO0701019S
B007O 10197
BOO701O19B
8O0701O190
BOO701O070
BOO701O1B9
BO070IOtSO
BO070 I OO70
80/06/24
BO/06/20
80/O6/13
BO/05/E8
BO/06/EO
90-237 P
FOIA
7O-2B3B
40-6789
FOIA
495
496
CROSS REFERENCE OF ENCLOSURES TO
PRINCIPAL DOCUMENTS
ACCESSION NUMBER
ACCESSION NUMBER
ENCLOSURE
PRINCIPAL
DOCUMENT
DATE
ISSUED
SUBJECT
CATEGORY
BQ070 10199
80D7O1O192
BO/0&/13
3D-H47
P
8007010204
8007O 10070
BO/06/2O
FOIA
BOO701O2.O7
BOD7OIOD7O
BO/06/20
FOIA
80070 102O9
80D7OIOI8D
BO/05/2B
40-6709
B00701021Q
3007O 10070
BO/06/30
FQIA
BOQ701021B
80070 1 0203
BO/09/19
50-499
0
B007010215
80070 1 0070
HO/OA/20
FOIA
S007010S1B
BO07D 1 DO7D
BO/06/SO
FQIA
B007010222
B0070 1 0070
ao/OA/20
FOIA
8007010233
BDO7DJD2I9
8O/O3/30
50-443
G
B007Oloa26
S00701O216
BO/06./3S
SO-306
R
8007010337
8007O 10070
BO/OA/2D
FOIA
S-OO7O1O229
S00701O319
BO/O3/30
30-443
D
8007010230
BOQ70 10070
0D/06/2O
FOIA
8007010232
B00701O219
aO/05/30
30-443
a
8007010233
B007OJ0070
80/06/20
FQIA
B0070 10234
C007OI0331
80/06/20
&0-S67
a
BOQ7Q10239
B007010219
BO/D5/3O
3O-443
a
8007010238
B0070 10070
80/06 /SO
FOIA
B00701034I
B00701OO7O
80/06/20
FOIA
8007010244
80070 J 0070
80/06 /SO
FOIA
B007010H49
BOO7O1OO/O
BD/06/2D
FDIA
8O07O10263
B0070 10236
BO/ 06/1 6
SO-4B4
o
B0070IOH74
8007010270
BO/06/16.
WASTE MfiT
B007O1O2SL
8007010056
ao/oi/o?
70-1062
8007010291
8007010283
80/04/34
50-334
0
BOQ7010E9S
B0070 10293
8O/O6/13
70-B24
BOO7Q103O1
8007010293
80/06/13
70-834
80070 10306
B007010299
80/0-1/24.
30-219
a
BOO7010343
8007010341
BO/06/25
3C--3B2
F
BOQ7O1O346
8007O1D344
BO/Ofi/33
50--367
R
BOO7O1O330
S007OI033B
BO/D6/S5
SO-SIB
A
B007OI03A4
8007010338
80/06/27
50-361
A
8007010373
8007010369
BO/06/19
50-313
r-
8007010374
B00701035S
BO/06/27
00-361
A
6007010373
8007010333
QD/0&/24
80-339
B
B007010377
B0070 10370
6O/0&/29
50-396
B
8007010380
B0070 10367
eo/06/i?
SO-313
F
B00701O3BI
B007010376
8O/0&/H7
30-306
P
B0070103B&
8007010362
BO/06/S3
SO -3 27
S
BOD7O10390
B007O103B9
80/0&/13
30-317
R
B007O1O393.
BOO'7OIO3B9
BO/06/13
30-317
n
0007O1O393
8007010178
80/03/22-
30-233
a
0007O1O394
800<7O1O340
eO/Ofi/26
50-361
8
8007010400
B007010396
BO/06/B4
30-33*
8
8007010409
8007010391
flO/Oi/23
50-371
3
8007010412
8007010406
8O/0&/27
30-34B
B
B007010414
BOO 701 0407
80/06/26
30-36B
S
60070104! 5
8007010398
80/06/Bib
50-339
S
B007010419
BDQ7OI04J7
80/06/25
90-327
a
BOD701O420
8Q07OIO409
80/06/23
50-366
s
0007010431
8007OI04B3
BO/06/23
30-324
0
00D7O1043B
S007010435
BO/06/23
30-337
S
8007010439
8007010434
80/06/26
30-346
S
8007010440
8007010437
BO/06/37
SO-36B
S
80070 1 044. 1
8007010436
BO /Ob/3 3
30-369
S
00070 1 0443
8007010427
80/06/26
30-200
S
80O70 1 0446
B007010444
BO/ 06/33
30-3*8
a
80O70 10430
8007010443
80/06/24
50-336
S
8007010491
B0070 10447
BO/06/H7
30- 1 33
P
BOO7O10499
B0070 10448
BO/ 96/27
30-286
B
00070 1 0436
80070 1039A
80/06/24
50-334
S
BOO70 1 049S
BOO? 01 04 54
BO-/06/B&
SQ-320
B
0007010477
B00701047I
BO/06/25
SO-2BS
P
BOO70 1 0480
B00701047O
BO/06/2S
30-313
R
S0070 1 0483
B007OI04B1
BO/ 06/37
30-333
S
80070 1 04BB
B007O10484
BO/0'6/23
30-595
B
B0070 10491
8007010483
BO/ 0-6/1 9
30-335
B
B0070 10493
30070 104B6
80/06/33
30-333
B
B007O1O50O
8007010493
BO/06/26
30-295
B
B007O10SOB
B0070I 0499
80/06/29
30-327
B
00070 1 0303
B007O10494
80/06/24
SO-366
&
80070 1 0303
B0070 1049?
00/O6/S4
30-H37
S
80070 1 0306
SOO70 1 0496
BO/06 /S3
50-267
S
30-325
B
SO-3S7
S
SQ-366
B
10-333
3
0-339
B
ENCLOSURE
PRINCIPAL
DOCUMENT
DATE
ISSUED
SUBJECT
CATEOORV
80070)0539
8007010332
BOQ7010533
0007010536
8007010937
800701Q534
B007O1O529
8007010327
8007010526
6007010533
BO/06/27
80/06/29
00/06/24
00/06/26
BO/06/23
30-306 B
30-327 S
30-360 B
30-334 B
90-206 0
0007010939
GD07010941
0007D1O342
G007010949
0007010331
8007010528
BO 070 10534
6007010531
BO 070 10540
0007010344
BO/06/ 33
00/06/23
BO/06/26
00/06/25
BO/06/24
50-327 B
30-327 0
30-263 0
30-293 S
30-237 0
0007010932
0007010939
0007010362
BO070 10364
00070 J 0574
0007010347
BO 070 10547
8007010397
BOO7010996
0007010570
BO/06/09
00/06/09
BO/03/30
00/06/20
80/06/13
COMMISSION
90-320 P
40-1162
50-335 S
71 -3B4
B00701Q37S
Q0070 10979
0007010382
BOO70109B3
8007010339
0007010373
8007010376
8007010300
8007010 SB 1
8007010301
BO/06/16
BO/06/12
00/06/00
BO/04/ IB
00/06/10
70-1300
71-292
CONTRACT
30-202 P
SO-3B3 P
8007010373
BOO7010598
0007010600
0007010602
B0070I06O3
0007010590
00O701O399
0007010999
B0070 10393
800701 039 9
BO/06 /06
80/03/14
BO/05/14
80/05/14
BO/09/14
40-B647
71-5900
71-39BO
71-5900
71-5900
80070 106O9
D007010611
8007010619
8007010619
0007010627
8007010599
8007010609
8007010609
8007010613
8007010624
BO/09/14
BO/06/ 10
80/06/10
BO/06/16
00/04/16
71-3900
4Q-B027
40-0027
CONTRACT
CONTRACT
BOO7020003
B0070300QB
00O702000?
B0070B0012
000702001 7
B007030002
8QD7030O03
00O7O30OO7
80O7020O03
80O7030O13
BO/09/2B
BO/03/2B
00/05/15
BO/03/2B
80/03/33
70-133
70-133
CONTRACT
70-135
70-1143
800702.0033
BQO7020023
BOQ703O031
0007020041
B0070HQ047
8007020019
8007020034
B007020027
00070B0033
B007020O44
80/03/23
BO/09/28
80/06/13
00/09/38
BO/06/12
70-1143
CONTRACT
30-346 0
30-277 0
71-5
B007020049
8007030060
8007020070
8007030073
BOD702.00BB
80O7020O33
8007020035
8007020033
8007020066
8007020083
00/03/30
00/03/20
HO/03/30
78/09/14
80/06/36
30-377 0
30-277 Q
30-277 Q
80-332 S
30-10 U
B0070H0095
80O7020Q96
BOO70B0103
B007020103
BOO7020106
BQO702QDB9
B007020O90
B007Q3QO97
0007020103
00070BOO97
79/09/13
BO/06/11
BO/09/30
00/03/30
BO/09/30
TOPREP
50-443 H
70-1100
71-6070
70-1100
BOO702010B
60070201 1 2
BOO70Z01 1 4
00070201 IS
BOO703QI21
B007030103
00O7030102
8007030107
0007030103
BOO7020O97
BO/09/30
00/09/30
BO/06/06
00/05/30
BO/03/30
71-6070
71-6078
70-1100
71-6078
70-1100
0007020139
00070201 44
80O7020149
80070201 SB
BOO7020164
80O7020128
0007020139
8007020131
B007020J3I
00070201 39
BO/06/10
79/11/14
BO/06/13
80/06/13
80/03/27
WABTE MOT
HI EC
90-361 Q
50-361 0
30-332 B
BOO7020166
BOO7Q20167
00070*0174
0007020 I7S
8007020188
BOQ7030131
0007030159
BOO7020169
BOO7030131
80O7020129
80/06/13
79/11/26
80/06/16.
BO/06/13
00/06/03
30-361 0
30-329 A
30-150 P
80-361 Q
COMMISSION
BOO7020191
B007030193
BQO7Q20203
0007030311
0007020217
8007020131
8007020183
8007020183
B007030199
8007020178
00/06/13
BO/06/19
00/06/19
BO/06/11
00/06/10
30-361 Q
30-10 H
90-10 H
50-293 Q
50-324 H
B007020320
8007030329
8007020233
80D7030237
B007020271
6007020213
B007020S16
B007020B30
0007030529
0007030S67
00/03/00
80/03/OB
80/06/17
80/06/09
80/06/18
70-1131
30-334 Q
70-2910
90-320 H
30-339 fl
000)7030375
0007020279
00O703O387
0007020290
0007020292
00O7030H67
B007020B64
0007030304
8007030200
8007020204
BO/06/18
00/06/09
00/02/12
00/06/17
00/02/13
90-239 Q
WASTE MOT
F01A
30-344 P
FOIA
CROSS REFERENCE OF ENCLOSURES TO
PRINCIPAL DOCUMENTS
ACCESSION NUMBER
ACCESSION NUMBER
ENCLOSURE
PRINCIPAL
DOCUMENT
DATE
ISSUED
SUBJECT
CATEGORY
60070202.94
80070 2D3 01
8007020303
B007Q20313
6007020321
B0070208Ba
80O702QB9B
8007020998
BQO7020303
6007030317
BO/OA/17
BO/06/19
BO/OA/19
GO/06/04
BO/06/02
30-344 P
30-321 0
30-321 0
90-320 U
50-339 Q
8007020323
8007030336
B007020331
8007020336
BQ0702033G
8007020303
eoo7oaoai7
B007020325
OOO70a0323
BOO7020099
BO/06/04
BO/06/02
BO/06/13
BO/06/13
80/09/21
30-320 U
30-339 Q
COMMISSION
COMMISSION
State Prog
8007020330
8007020334
8007020337
B00702033B
B007Q20361
80O70 10006
BOO7020349
8007020109
BOD7020339
BQO7020334
BO/&3/25
BO/O6/24
ao/os/19
BO/03/30
E30/O6/24
7O-B24
30-317 P
30-247 P
70-27
50-324 8
6007020363
BO07020366
8007020378
8007030373
B0070203B2
BOO7030339
8007020342
80Q7020362
8007020370
8QO7020370
QO/09/30
BD/06/3O
BO/O6/30
BO/O3/14
BO/O3/14
70-27
90-BOA P
30-20A P
50-67 R
50-67 R
QOO702039B
B00702040S
8007020411
B007Q2Q413
BOO7020430
B0070203B6
BOQ70H0397
8007020402
BOO7QHQ406
B00702040B
BO/06/10
BO/O6/B7
BO/O6/11
BO/O6/10
BO/O6/27
CONTRACT
30-382 3
90-409 D
PR
90-434 K
8007020423
8007020428
60O7020431
8007020437
B007Q20442
BOO70E0417
BOO7030422
8007020429
8007020432
B0070B0436
GO/04/23
BO/06/19
HO/06/13
BO/06/ 11
BO/O6/27
SO-26B P
71-6693
70-260?
90-271 0
30-317 P
B007Q20443
BOO702044B
B00702Q433
B007Q204B3
BOO7020493
BOO702Q130
BOO7020436
BOO7030431
80O70204B1
8007020490
BO/O6/13
00/06/27
BO/O6/1Q
BO/O6/19
BO/O6/17
ORO
30-317 P
50-271 H
30-3 0
90-193 P
BOQ7020S06
BOO7020917
8007020922
8007020923
80Q7Q20329
8007020900
8007020912
BOO702091B
B007020920
BOO70B032S
BO/06/18
BO/O6/1B
BO/O6/17
SO/O6/26
BO/O6/26
71-9942
71-9016
71-381
50-366 6
30-92B S
B007Q20B32
B007020933
BOO7020S39
8007020941
8007020743
80070E0927
8007020931
B0070S093B
B00702Q33B
B007020343
BO/06/18
80/06/23
BO/O6/B4
BO/O6/24
60/O6/26
71-9015
30-S2S 8
30-416 B
30-416 B
30-3HB 8
BOO7020347
BOO7030531
BOO7020933
8007020934
B0070B0574
8007020S46
8007050344
8007020942
8007020990
BO 07030357
80/06/29
GO/06/S6
BO/06/10
BO/06/16
GO/O6/30
9O-334 R
90-3B8 S
CONTRACT
SO-32O 0
30-253 P
80070203B1
8007020 BQ3
80O70305B8
BOQ7QB0393
B007020996
BO0702Q337
80070 204B4
BO070 20337
8007020937
8007020970
flO/Ot/30
80/06/19
BO/O6/30
BO/06/30
BO/O6/3D
SO-255 P
7i-90Ea
9O-255 P
90-355 P
TDPREP
8007020 99B
H007030399
80O702O600
B0070206Q3
8007020610
0007020992
BO0703Q3S7
8007020997
B007O2060L
8007020607
80/O6/30
BO/O6/30
80/06/30
BO/O6/13
80/C6/96
3O-33B P
5O-239 P
30-259 P
90-416 S
30-309 0
B00702061 1
6007020633
BQQ7Q20643
8007020644
B007020647
BQ070206QB
8O0702Q630
8O07O20638
8OO/OS0641
BO07020&49
80/06/12
BO/06/23
BO/ 06/87
80/06/30
80/06/27
70-1308
90-416 B
90-331 B
TOPREP
70-143
BOQ7020692
8007020636
80O702O&6O
B007020674
BOO702067B
8007030630
BO07OZ0649
8007020649
8O07030672
80070B067B
BO/Ob/04
BO/Oi/27
BO/OA/37
BO/06/11
BO/06/10
71-381
70-143
70-143
CQHMIBSION
50-498 A
BOQ702Q6B3
B00702Q693
B0070B071B
B00702O731
BO0703O011
800702036 i
B007020A8B
BO07O20708
B007020730
B007O30004
BO/ 06/06
80/06/29
BO/ 06/09
BO/ 06/06
80/06/23
71-9130
90-2B1 H
HASTE MCT
CONTRACT
70-247B
8007030016
B007030017
B007030020
800703003B
BOO703O027
B007030004
8007030010
8007030004
B0070300BS
BO070300E3
BO/06/23
BO/Ofi/23
BO/06/83
80/06/19
BO/06/ 11
70-2470
80-956 H
70-2470
7O-11 91
30-466 0
ENCLOSURE
PRINCIPAL
DOCUMENT
DATE
ISSUEP
SUBJECT
CATEGORY
B007O30033
B007030031
ao/og/o1?
40-B647
eo0703QQ3B
8D0703D033
BO/06/23
FOIA
BOO7030039
B007O3003 1
BO/O3/09
4O-8647
BOO? 03 0040
B007030036
80/O6/09
50-369 Q
B007030047
BO07O3O011
80/05/0*?
4O-B647
Q007030050
B00703OQ45
BO/05/13
PH
B007030055
900703003 I
BO/08/0?
40-B647
S007O3CJ059
8O0703O04S
BO/03/13
PR
8007O3007 1
8007O300iB
SO/O6/13
CONTRACT
8007030135
BO07O3O131
BO/O6/3O
3O-2BO P
G0070301BO
B00703017B
BO/OA/30
30-SB2 R
B007O301S3
900703017B
BO/06/30
SO- 282 R
8007O301B9
8007030185
BO/07/01
50-113 A
B0070302OS
B007O30W4
80/06/04
&0-58 5 P
8007030309
B007O302O4
SO/Ot/17
PR
BOO7030313
B00703031O
EO/O&/16
50-273 P
BOO703OS17
B007030212
SO/06/26
30-331 B
BOO7030331
BOO7 0303H B
BO/O&/19
70-1 1 1 3
BO07030235
8007030224
BO/06/ Sb
&0-33 1 S
BO 07030341
BOD7 03033 B
BO/06736
SO-33 1 B
G00703034B
8007030245
QO/06/30
50-416 A
80070302S1
B007030230
BO/O7/01
30-233 P
B007030264
8007030260
BO/06/27
50-346 S
800703024.7
S0070302A2
BO/O6/30
50-339 E
B007030afc')
BO07O302&3
BO/D6/3O
50-338 B
B007030271
B007030S7O
BO/06/30
30-333 S
BO 07030274
B00703O273
BO/06 / 21
30-366 S
3007030275
8007030273
BO/06/30
9O-D39 S
8007020278
S007Q30274,
BO/OA/24
30-321 S
B007O30279
8007030277
8D/O6/36
50-366 8
B007D342B2
BOO70302BO
BO/OA/24
30-366 S
BOO703D2B3
B0070303Q I
BO/O6/30
30-339 S
B00703Q2B6
0007030294
BO/OA/23
30-331 S
8O070302BQ
HOt>70302B5
80/07/01
50-339 3
BO070302B9
80070302B7
80/07/01
30-293 S
B007030293
B007030290
BO/O7/01
30-299 O
8007030294
B007030291
90/O7/02
70-2909
B007O30293
8007030292
BO/Ofc/17
70-143
8007030396
BOO703oa<JO
80/O7/01
50-239 Q
BOO7030297
BOO703039O
BO/O7/01
30-299 O
BOO703029B
B007030292
BO/06/17
70-143
B007030399
B0070aOS<)0
BO/07/01
30-289 0
BOD70303O1
B007030290
BO/07/01
30-289 0
80070 303O2
8007030290
BO/07/0 S
90-EB9 0
8007030303
B007030390
BO/O77D1
30-289 H
B007O30304
8007030290
80/07/01
30-239 0
8D07O30346
6007030336
BO/-06/12
CONTRACT
BOO70303S7
B007030353
80/06/13
CONTRACT
BOO7030363
BOO703O33B
BO/06/02
40-9302
B007O30364
BOD703D33B
BO/OA7O2
4O-B3O2
B007O3037Q
80O70303&8
BO/O3/07
70-1201
BOO703037fc
B00703Q378
BO/06/13
71-9039
80O703037B
BOO7030373
BO/O6/13
71-9039
BOO7030379
00070303 ?S
BO/06/ J 3
71-9039
BOO703D3B1
B00703037S
BO/06/13:
71-9039
B0070303B4
8D07030373
80/06/13
7 1 -9O39
B0070303B3
8007030375
80/06/13
7 1 -9O39
B0070303B6
•B 00703 0373
BO/ Ob/ 13
71-9039
B007O303B7
8007030375
80-/O&/13
71-9039
8007 030393
B0070303B9
BO/-06/13
70-33
B007070O09
B007070003
BO/OS/O?
7O-2479
BOO70700O6
B007070004
BO/06/ 16
XPORTi-IC
BOO7 0700GB
B0070700Q4
BO/06/16
XPQHTL1C
B007070014
9007070010
80/06/19
70-143
BOO70700 1 S
8007070010
8O/06/19
70-143
8007O70O17
8007070O1O
80/06/19
70-143
80070700 19
BOO7O7001O
BO/06/19
70-143
8007070034
BOO7070023
BO/06/12
XPORTU1C
BOO7070031
B0070700K6
flO/06/19
90-31 fl D
8007070033
B007070026
BO/O6/19
30-514 D
B007O70036
8007070026
80/06/19
50-814 fl
B007O70039
B007O70035
BO/06/ 31
50-269 P
B007O?0'04O
B007070036
BO/06/19
30-314 D
B0070SOO44
BOO7070026
SO/O6/ 1 9
90-314 D
80070V004S
BO 070700 4 2
ao/06/ 1 3
40-1341
B007070046
S007070024
BO/OA/19
50-314 D
BOO7070049
B007O70O26
BO/OA/19
50-314 D
BOO7070030
8007O70026
BO/06/ 19
50-314 0
BO 07070053
8007070026
9O/O6/ 1 9
30-314 D
BO07O700S4
B0070700B3
80/06/ JB
CONTRACT
CROSS REFERENCE OF ENCLOSURES TO
PRINCIPAL DOCUMENTS
ACCESSION NUMBER
AC CESS I DM NUMBER
EMCLOSURE
PRINCIPAL
DOCUMENT
DATE
I SSUEB
SUBJECT
CATEGORY
BQ07070Q55
8007070036
BO/06/1?
50-514 D
BQ070 70056
SOO7Q7O051
BO/OS/2!
5Q-2B2 Q
B007Q-7QQ37
8007070032
BO/06/ IB
CONTWrtCT
8007070056
60070700 SJ
BO/Oi/lB
COflTR^C F
8007070060
BQ07070052
BO/06/ IB
COMTRflCT
B00707006J
B007070051
00/05/31
30-233 Q
Q007O70063
B007O70O53
flo/06/ia
CDMTRftCT
B0070 70064
80070700 5?
BO/0&/20
50-2QO H
BG07070069
£3007070059
BO/06/2O
SO-2BO H
B00707Q074
BOO7O70072
60/05/23
EO-1O Q
B007070075
B007O70059
B&/06/BO
50-2BO H
B007070079
SQ07 070037
GO/06/20
50-3RO H
BOQ70700BO
8QO707OO72
BO/03/2J
50-1O Q
0007070097
Q0070700B3
BO/O5/S3
50*405 G
BQ0707Q09t
B0070700BJ
SD/03/S3
30-1182 Q
Q00707OQ98
0007070095
BO/0&/J7
50-341 S
8007070100
BQ07070097
BO/06/3*
30-335 Q
8007070102
0007070097
BO/06/34
3O-133 Q
8007070103
BOD707QQ<77
BO/O6/E4
50-335 0
8OQ707OIO7
B007Q70097
BO/06/34
5O-333 Q
S007070I 30
80Q7Q7Q119
BO/ 06/26
50-339 A
8007070133
BOO707OI38
80/Ot/lC
71-G92
B007070I 31
0007070129
BO/O6/1O
CONTRACT
BOQ7Q70161
B007070157
BO/ 06/20
30-2B4 B
BOQ7070162
B007070131
BO/06/11
90-330 H
500707016-7
B007070163
00/09/39
50-399 a
BQ0707O176
BOO7O7014B
80/06/30
50-3*8 R
B00707G179
B007070I77
80/06/06
71-9130
800707G100
90070701 66
00/06/30
5O-34B R
B00707OIB3
3007070177
BO/ Oh/06
71-9130
80070701 B5
8007070177
GO/06/Oft
71 -91 30
6007Q7O190
8007070 168
DO/&6/30
30-34B If
6007070194
8007070160
00/06/30
30-3-18 R
6007070193
B0070701B7
BO/06/24
70-1113
B 007070 197
0QO7O7O16B
00/06/30
30-3*8 R
HO07Q70204
QOQ7070168
BO/06/30
50-34B R
0 0070703 Oh
8007070193
BO/07/01
50-273 A
B 0070703 OB
B00707016S
80/06/3O
50-34 B B
B 007070311
8007070160
BO/OJt/30
30-34B i]
BG070702 1 7
8007070 168
BO/O6/3O
50-343 it
0007010311
8007070168
BO/Od/30
90-348 R
8007070223
B00707016B
00/06 /M
30-318 H
8007070326
(TQ0707Q16B
BD/06/30
90-348 R
BC0707022B
6007O7016B
00/06/30
90-3*B R
BO 070705 29
0007070231
00/07/03
30-260 S
6007070230
B 007070 160
60/06/30
50-34 a It
BOQ7070333
60Q7Q70I6B
BO/OA/30
5Q-34B fi
B007O70237
BOO 707 0234
BO/OA/27
50-325 S
600707023*
8007070353
BO/07/01
5.0-331 P
80070703 &5
0007070333
90/07/01
90-331 P
0007070356
BOQ7070248
BO/Oi/30
50-3B7 B
B0070702A&
BO 07070259
ao/OA/a?
50-aif H
BO 07070370
BOO7070269
80/07/03
50-395 C
8007070269
6007070289
80/06/27
3Q-37S P
B0070703G7
BOQ7070300
00/07 /02
30-344 P
0007070313
E 007070303
BO/06/30
30-28*7 8
B007070315
6007070310
BO/07/01
90-484 0
BOO 7070323
B 007070330
ao/07 /oa
30-320 P
BOO 7070323
6007070319
BD/O^/30
30-H69 B
BOO 7070324
B00707031B
BO/06/27
30-336 B
BOO 7070335
0007070333
HO/06/27
70-143
0007070353
60O7O7O337
QO/Ofi/a7
H 0-320 0
BOO 70703 56
B 007070 3*8
80/06/13
BO -272 R
0007070363
6007070358
80/07/03
50-339 B
B007070365
0007070337
80/06/27
30-320 Q
8007070371
8007070337
SO/06/27
30-320 0
B007070372
80070703(, t
BQ/Ofi/27
50-336 8
8007070379
B007O70371
•HO/07/O3
30-339 S
BOO 7070301
BO 070703 73
BO/07/03
50-330 S
0007070383
B00707037B
80/06/35
30-393 B
BQ0707Q3B3
BOO7070373
80/06/23
30-2H9 S
800707030 B
B007Q70397
BO/07/01
80-273 3
0007070397
SOO7070309
BO/07/01
30-260 8
0007070399
BOO707039'!
8O/06/31
30-34B 0
8007070410
BOO70704 1 -t
OO/O6/1B
CONTRACT
8007020003
B00706000I
BO/ 07/03
50-330 0
8007 09000 B
80070B0004
6O/06/30
30-299 0
80070BOOOA
B0070B0001
flO/07/03
90-330 0
800708001 1
B0070B001O
60/07/03
90-413 1
8007000012
BOD70BOD1O
80/07/03
30-443 I
ENCLOSURE
PRINCIPAL
DOCUMENT
DATE
ISSUED
SUBJECT
CATEODflY
BOO7OBOO 1 4
8007060010
00/07/03
30-443
I
B007OBOO 1 3
B00708Q013
BO/06/30
30-466
0
80070500 1 6
8007000010
BO/07/03
50-443
!
8007QBQ017
8007000013
80/06/30
30-466
Q
8007080016
BO07080D10
80/07/03
50-443
I
80O70SOO19
8007080010
80/07/03
30-443
I
80O70B002D
•3007080010
BO/07/03
90-443
I
9007060022
QO07OB0010
80/07/03
30-443
I
80O70BOO29
8007080010
BO/07/03
90-443
I
BOO7080O2B
S0070B0010
80/07/03
30-443
I
BOO7080O31
80070B0010
80/07/03
30-443
I
BOO70BOO33
Q007OB001O
BO/07/03
90-443
I
BOO7QBOO37
G0070B0010
00/07/03
30-443
I
B007OBOO3B
BOO70B0010
BO/07/03
90-443
I
B007OB0040
B0070B0010
80/07/03
90-443
I
8007080030
8007080043
BO/06/S6
50-HB9
0
aoo7oaoo72
13007080069
80/07/03
30-33B
P
BOO7OQOO83
3007000 OBI
BO/07/01
90-3A 1
A
B0070BOOB4
S0070BO000
90/07/03
90-334
P
3007OB0134
SOD70BO144
SO/07/03
90-368
B
6-0070301^6
B0070B0160
BO/06/27
90-368
0
B0070B01A9
BOO70BO 1 64
80/06/26
90-336
P
BOD7090172
800708D162
BO/06/26
30-269
8
8007080176
BO07080164
80/06/26
90-336
P
SOO7D8017S
BO070BO171
00/06/37
30-368
B
B007090IB3
SOD70BD180
80/06/87
90-339
8
B007Oa01'72
H0070B01B3
80/07/03
30-293
3
8007030199
B0070BO169
80/07/01
90-333
S
9007OB020O
B0070B0196
80/07/02
90-293
S
aoo7oaoaos
BQO7QBOEQ2
80/07/03
90-893
S
BO070S0207
80070BOK01
80/07/03
90-870
B
BO070502OB
B0070BOB06
80/07/02
30-303
P
8007080214
B0070BOK11
BO/07/O3
90-889
S
BOO)70SOS19
aooroBOBio
60/07/01
50-267
B
BOO708022B
BO070B023E
BO/04/30
90-364
A
6O07OBOS32
8007080233
BO/06/30
90-364
A
BtK37QBOS3f>
8007060223
BO/06/30
30-364
A
BOO7OB0239
B0070BOE34
00/07/03
30-383
8
B0070B0243
BOO70B0222
80/06/30
30-364
A
B007080800
BOO70BOB32
80/06/30
90-364
A
B0070SOZ57
6DO70BOK49
80/06/30
90-400
6
Q007OBOZ&B
B0070BOK54
60/06/19
30-267
B
BDD70B0275
0O070B026B
BO/06/19
90-267
B
80070B0377
BQ070B0270
80/06/26
90-312
B
B007OB027B
8007030=73
00/06/27
40-8036
D0070B02BO
8O0708D867
00/06/30
30-273
8
BOO70B03S3
8007030274
BO/07/01
TQPREP
B0070B02BB
8007080503
00/06/27
30-327
B
BOO70B029O
80070B0284
BO/06/29
90-339
8
BOQ7QB0291
eoo7oaoKai
80/06/30
50-327
8
B0070B0276
8007030292
BO/07/01
50-271
Q
BOO70B0297
BOO7080&93
80/06/27
90-299
8
8007080302
8OO70aO299
80/06/13
90-29B
B
BOO70803O4
B0070B02B9
80/07/01
30-267
8
BOQ7Q8O3O3
80O70BO300
80/07/03
90-409
P
B00700030B
BOO70aO301
BO/06/H7
90-899
B
6O070BO3S7
B0070B03S3
60/07/02
90-321
P
0O07OB0333
BOO70B0313
BO/07/01
30-339
6
BO070B033S
B0070B0330
79/03/01
30-333
R
B0070B0341
BQO7080334
80/06/37
30-327
8
80070B034B
8007080346
80/07/01
30-199
R
B0070B0333
80070BO349
BO/06/18
PR
8007080394
BOD70aO330
80/07/03
90-866
B
8007080337
BO070BO349
80/06/1S
PR
eoo7oao36o
BOO70BO349
80/06/1B
PR
B0070BO3iK
BOO70BO33S
BO/07/02
90-206
8
6O07DBO36Q
BO070BO3A9
60/06/16
BO-39B
9
B007OBO373
BOO70B0370
BO/06/30
90-360
B
60070BO384
BOO7QBO3B 1
60/06/27
30-301
a
BO07OBO39O
BOO70B03BA
BO/07/02
30-309
B
B0070B039B
B0070B0391
00/07/01
BO-H9B
fl
BO07OB0399
B0070&0394
BO/06/37
30-260
B
6O070B040S
BO070BD4DO
80/07/01
30-387
B
BO070B0409
8O070QO406
80/07/01
30-867
R
BOO70B041D
8O070BO403
BO/07/01
90-306
8
9007080411
8007000409
80/06/27
50-860
B
800708O4 I b
B0070B0410
BO/OA/30
90-296
8
B0070B0417
B0070B0413
BO/07/OS
90-309
B
B007OB04ZO
BDO7080418
00/06/27
30-344
8
6O070BO425
8007080422
80/06/19
90-267
B
CROSS REFERENCE OF ENCLOSURES TO
PRINCIPAL DOCUMENTS
ACCESSION NUMBER
ACCESSION HUME EH
ENCLOSURE
PRINCIPAL
DOCUMENT
DATE
ISSUED
SUBJECT
CATESOHY
0007080426
SOO70B0423
00/07^01
50-272 S
BOO 7 0 TOO O 6
B007090Q03
BO/-07/01
30-259 B
9OO7O9OO07
BOO7090Q05
OO/O6yi3
5Q-S9a S
BOO7O90O 1 0
BOO709000B
SO/07./ 02
50-359 P
8007O9QO14
90O7090013
BO/06/20
50-34(1 Q
BO07090016
BO O7 0900 13
BO/01,/30
•iO-34b Q
BO07O900 1 7
B007D90015
BO/06/03
SECY
0OO7O90O19
8QO7Q9Q01S
BO/Ofi/03
SECY
80Q7Q9OD21
BOO709001S
80/06/03
SECV
SOO7O9OD23
00 0709 001 3
CO/Ofi/03
SECY
B007 070029
BO 070900 IS
BO/OA/O3
SECY
BOO? 0900 30
B00709002B
BO/OS/16
10CFR
BC07O90033
B00709003B
G(J/09/16
10CFR
60D7O90Q3Q
900709 003B
HO/Oa/tA
1OCFR
8O07090O66
B007090061
GO/O6/t2
71-3B7
BOO7Q901O3
B00709009B
80/O5/19
PR
BOO7O9Q114
BO 07090 10-1
BO/O6/O6
COMMISSION
BOO7090 1 40
B007090143-
BO/01/11
PR
SOO7O9O136
8OO7090I54
QO/03/B1
30-440 Q
9007090139
8O07090IB4
flO/OS/21
90-440 0
BOO 7O90 1.66
B007090163
BO/O6/30
NUREQ
BOO7O90167
B007090163
BD/06/30
NUFIEQ
8007Q9O170
BOQ7090I6S
BO/06/24
5O-369 Q
B00709O17B
8007070176
BO/03/31
5O-440 Q
BOO709O179
BO070-70176
BO/03/S1
5O-440 0
BOO7O9OIB6
00070901B3
BO/Ofa/34
70-1357
8007090*99
90O709Q19B
BO/O7/03
50-333 R
8007090201
BOO709O19B
Bo/07/01
TDPREP
B007090243
8007090243
BO/Ofa/27
50-332 K
BOQ709023B
B007090249
80/07/03
30-337 E
BOQ7090270
B007090B4B
BO/O7/03
30-352 S
8007O90375
B007090B65
BO/O7/OS
30-332 S
8007090276
BOO709027 1
BO/O7/01
30-269 P
8007090292
8007090289
BO/O7/02
50-316 B
B007090H9B
B007090290
BO/06/30
5-0-466 0
[3007090304
BOO7O90B96
co/07/oa
50-339 S
B007O90312
90O709030B
BO/O7/02
30-339 S
B007090319
Q007090314
BO/O7/O3
90-253 S
BOO70VO323
B007090317
BO/O7/O2
BO-331? S
BOO7O90336
BOO 7090321
80/07/O4
5O-21 3 B
BOO7O7O332
8007090324
BO/O&/2&
90-317 P
BXK57090336.
SO 07090338
BO/07/ 03
30-36B S
BO07090337
BO07090330
60/06/27
30-361 3
BQ0709033B
B007O90334
BO/07/O2
30-334 S
8007090341
aOO7090331
B0/06/2fa
30-317 P
8007090343
8007090333
80/07/OH
50-339 B
BO07090346
80 0709 033-1
flO/06/26
50-317 P
BQ0709034B
8007090310
ao/07/oa
50-334 B
B007Q90352
8007090334
60/06/26
50-317 P
80O70903S3
3007090343
PO/07/02
5O-33B B
BQ07Q90339
S007070J5A
00/03/27
30-317 Q
B00709O36I
BO070 90321
tlO/04/2A
SO -31 7 P
DOO7 090368
B007090324
SOV06/26
30-317 P
8007070373
BO07O7037O
BO/OS/09
30-27J Q
B0071O0003
B007JOOOO2
ao/os/si
80-320 Q
HQ07100012
B007 100009
ao/oi/09
5O-320 0
BOO710O014
B007 100009
SO/01/09
SO -330 Q
BOO710001S
B 007 10000 3
BO/Ot/27
7O-143
8O0710OOSO
H 0071 0000 B
BO/O6/27
7O-143
BO0710QOB3
BOO7 1 OOOOB
SO/Oi/27
7O-143
BOO71O0026
BO07 1 00033
BO/O7/O3
30-295 0
eoo7ioooaa
Q007 1 OOOOB
BO/06/37
70-143
BOO? looosB
aoo7iooooa
BO/06/H7
70-14S
BOQ7100034
3007100029
SO/ 07/07
Sa-3fl4 G
B00710O037
B007 100033
80/06/26
50-195 0
B0071O003S
BOO? 100008
BO/06/27
70-143
B007 100041
B007100040
BO/Oi/24
71-6581
8007100042
BOO/100033
BO/06/26
30-131 Q
BOQ7100044
80071 OOOOB
B0/06/a7
70-HJ
BO071OOOSO
80O7100047
80/07/07
PR
8007 lOO03a
aoo7tooooa
80/06/27
70-H3
BO071OQ034.
B007 100047
SO/07/07
fit
B0071Q0037
B007IOOOOQ
80/06/27
70-IA3
BO0710003B
B007100031
BO/06/16
50-34 * 0
8OO71 00060
8007 10003S
BO /OS/ 2 9
50-23 1 0
BOO? 100061
80071000S9
80/05/39
50-333 0
aooviooota
BD07100O31
BO/06/16
30-314 0
80O7 100066
H0071000A4
BO/OB/a9
90-321 0
B007 100069
B0071 OOOOB
BO/O6/27
70-143
BOD7 100071
BOD710006B
BO/Ot/04
SO-293 Q
ENCLDSUJ1E
PRlHCIfflL
EDCUMEMT
DATE
IGSOED
SUBJECT
CATEonrr
/
G007100072
ao071C10COE3
80/06/27
70-113
6007100074
SOD?! 00060
BO/06 /01
ao-^9 )
0
80071O007i
80071OOOOD
ao/ot/27
70- H3
0007100081
B00710000H
00/06/27
70-143
80071 OOOB9
Q0071000B9
U0/06/0ri
50-1O7
0
0007100091
B007IOOOBO
B(l/0(,/lft
40-1 !6c!
EJOQ71OOD93
Q007100093
BO/0 hf 20
30-261
0
BQ071O0099
aoo7iooo<»6
aQ/C(,/O3
90-546
tt
8007100102
0007100097
BO/05/29
30-aO(b
n
H007 100103
BO07IOO097
BO/03/39
30-306
P
Q007 100106
9007100103
Htl/Ot,/KJ
30-JH6
c
B0071O0107
B0071O009/
BO/05/29
30-2O6
p
0007100110
Ii007!00fc0.1
00/06/13
90-336
p
0007100112
6007 IOO 109
90/06/10
CDNTOACT
800710011'!
B00710010T
80/06/13
30-306
p
B007100113
aoo/ioaii i
S0/0ij/l«
30-303
p
900710011 0
800710011 ]
so/ot/ia
30-302
p
B0071O0121
00071OOH1
00/0(,/J8
50-3O3
p
B007 1 00 1 34
QOD71O0111?
BO/03/30
30-416
Q
8007100131
B007IOOI07
BO/OD/2Q
50-327
Q
8007100136
Q007100K12
BO/06/13
BO -333
P
B007100133
8007100132
BO/06/13
50-33S
P
B007100141
B007100132
SO/Q6/13
BO -333
P
B007100147
9007100112
80/07/03
50-29-1
P
B0071O01SI
8007100114
BO/03/S7
50-31.1
(]
8007100154
B007IR0182
BO/Ofi/16
PFIDJ
8007100156
B0071001BO
SO/06/ 1 2
BO-^61
P
B007100198
ano7iooi53
80/06/19
50-277
P
BO-07100162
8007100130
HO/06/ 1 a
3 0-261
P
B0071D0164
H007100I37
BO/07/ 02
50-245
b
B00710Q1&5
B0071001HO
BQ/06/12
30-261
P
8007100166
H007 1001*3
00/06/37
!>0-:3B£
V.
B00710OltB
0007 100 163
BO/OA/27
30-3B3
H
B007100I7S
80071001A7
QO/07/02
B 0-2-1 5
!,
8007100176
BOD7IODI73
ao/07 /oa
90-SA/
B
B00710017B
80071001/3
00/06/36
S-Q-372
C
B0071001BO
0007100160
BO/O7/07
PB
6O071001B4
00071 00 1(,0
00/07/07
PR
00071 00 1B6
B0071001U3
BO/06/26
10-330
P
8007100188
Q00710Q160
BO/07 /O7
PR
BO071O0189
80071001/9
00/07 /OH
30-237
6
B0071O019I
B007IOOI60
ao/07 /o;
PFI
B007100192
BOO7100lfJ7
BO/07/03
50-237
!>
0007100193
B007100190
00/07 /Ol
SO-S63
B
8007100201
BOO7100I99
BO/07/OJ
ao-23-i
P
8007100202
8007100197
BO/07/0^!
80-37J
B
B 007100204
8007ICOW9
80/07/03
30-2S3
P
BOO? looaot
B00710O303
DO/06/ 19
90-312
P
0007100211
B00710Oa07
BO/09/2B
30-302
P
B007100B12
800710O310
OO/Od/24
TCTTEC
3007 1 002 1 3
BQ 07 10 0309
HQ/O7/OJ
30-430
3
BOD? 1 00220
BOO7]OOai9
BO/O7/03
TOPFIEP
B007100223
8007100323
BO/Ofi/]/
30-267
a
8007 100236
eoo/iooara
BO/Ofa/30
30-430
H
aoo7tooa'3d.
H007100B93
BO/04/21
TOPttEP
B007 1 002 S/
BOD? 10 OS!)-)
80/07/03
Pfl
3007100267
B0071UOa&l
80/07/01)
30-348
K
B007iooatn
B007100S(,2
BO/06/30
SO-2O6
n
B007 100271
8007 1 00363
BO/Ofi/12
XPDHTL1C
0007100276
Q007100afcl
BO/O7/OI!
30-34B
w
0007100277
11007100373
SO/0//07
SO-2E10
p
8007100290
aoov 100373
80/07/0/
BO-2BO
p
B00710D2B4
00071003/3
80/07/07
5O-2BO
p
B0071003B7
B0071002H1
BO/Ofi/03
XPURTLIC
BDQ71002BB
B007100373
BO/O7/07
Bo-aao
F>
B007IOOafl9
9007100372
80/06/H3
S 0-352
n
8007100391
aoo7iooae^
BO/09/HO
30-33 1
a
B007I00293
P007IOOB73
GO/O7/O7
50-28-0
p
B00710029Q
B007100373
BO/07 /07
30-2BO
p
B007 100299
B007 1 001396
eO/06/Oti
50-335-
p
8007100301
BOO/I C10H97
BO/06/16
flO-100
a
BOO710O303
B007100B73
BO/07/07
90-2BO
p
BOO71OO3O3
B007 100297
OO/OA/16
90-4OO
o
8007100307
B007 100296
BO/06/Ofi
30-B&3
I1
B00710O309
8007100E9S5
80/06/26
10-546
0
S007I00309
B0071002-/T
ao/07 /o;
30-2 BO
p
80071O03IO
B0071C10S96
80/06/06
30-255
p
BOO71003U
B007 100273
BO/07/0/
90-aao
p
B007100312
B007100304
BO/06/10
CONTHftCT
BQ07100313
8007100297
BO/06/16
SO-40O
a
500
CROSS REFERENCE OF ENCLOSURES TO
PRINCIPAL DOCUMENTS
ACCESSION NUMBER
ACCESSION NUMBER
ENCLOSURE
PRINCIPAL
DOCUMENT
DATE
ISSUED
SUDJECT
CATEGORY
BO07100313
B007 100273
80/07/07
3O-2BO P
BQ07 100321
B007 100273
80/07/07
3Q-ESO P
BO0710O323
BOO71OO273
BO/07 /07
30-2BO P
BO07 100329
B007IO0273
BO/O7/O7
50-380 P
BO0710O33Q
BQ071OO326
BO/Ofe/05
awi?
BOO? 100333
80O710Q324
BO/06/05
OA999
BGO71 00334
B007100327
BO/04/16
F01A
BOO? 100333
BOO71O0273
BO/O7/O7
50-230 P
BC-07 100336
B007 100336
BO/06/O5
OA999
8007100339
B007 100273
BO/O7/O7
5O-28O P
BQ07100337
B 007 10 0326
80/06/05
3ft999
60071003*6
8QQ7J00342
ao/os/aa
50-498 0
BOD7 1003*7
8007100373
80/07/07
50-2BO P
BOQ710O331
8OO71O0273
BO/07/07
50-EBO P
B007100353
8007100349
BO/O6/I7
71-3B7
E007100359
B007 100273
BO/O7/O7
SO-2HO P
B007100365
B007 100273
BO/07/07
so-aao P
8007100367
BOO71OO336
BO/O6/H4
SO-324 0
B00710036B
BC-07 100361
BO/06/LB
CONTRACT
B0071 00370
6007100362
BO/04/ 30
70-1151
B007IO0371
8007100273
BO/O7/07
SO-23O P
B007100374
8007100362
BO/04/ 30
70-1131
BO07IQ0373
BOO710O273
BO/07 /O7
30-280 P
B007100376
8007100373
80/06/16
71-9093
SOO7I00377
80D710O356
HO/O6/24
30-334 0
8007100380
BQO7IOO273
BO/O7/07
50-SBO P
B0071003S1
BOQ710036H
BO/04/3-0
70-1151
8007100362
8007100273
BO/07/07
30-200 P
B007 100384
B007100356
EQ/D6/24
50-324 0
B0071003B7
B0071 00273
fl 0/07/07
90-280 P
B007 100391
8007100273
BO/07/07
5O-SBO P
8007100395
HOO71OO356
SO/06/24
3O-321 a
8007 100397
8007100390
80/04/30
70-IE01
8007 1 00398
B00710O356
80/06/24
5O-324 0
B007 100401
8007100374
BO/06/O2
SO-219 P
B007 100403
B007100273
BO/07/O7
BO -280 P
B00710O404
BOO710037O
80/04/30
70-1201
BO071O0403
B0071 00374
B 0/06/0 3
BO-219 P
B00710O4D7
O007100273
BO/07/07
30-360 P
B00710040H
30071003^4
80/06/02
so-ai? P
BOO? 100409
8007100273
6Q/07/D7
so-aao P
8007100410
8007100390
8O/O4/3O
70-1201
8007100413
BOO71O0356
BQ/06/S4
30-334 Q
8007100414
BOO710O373
BO/07/07
SO-2BO P
8007 1 004 1 5
BOOT 100E73
BQ/07/Q7
30-280 P
80071004 IB
BOOT 1001 12
BO/06/23
50-400 0
B007100419
B007100417
BO/06/23
50-413 Q
BOO? 1 OQ42O
8OO71OO399
80/0&/1B
30-10 P
8007100422
8007100412
00/06/23
30-400 0
8OO7 100423
BDD71DD4J7
BO /Oii/23
50-413 0
8007 1 00426
BOD7 100417
BO/06/23
50-413 O
8007 1 00428
8007100412
BO/06/23
50-400 O
B0071 00430
BOO710O412
BD/06/S3
30-400 Q
8007 1 00432
B007100417
80 / 06/33
30-413 Q
B007 100435
B00710Q412
80/06/23
50-400 0
B007J0043B
B0063OO220
80/06/20
30-330 H
B0071OQ446
B007 100445
BO/06/03
40-S9D2
B007I 00462
8007100461
80/06/16
71-9094
B00711CWO7
B007110004
BO / 06 / 27
70-143
B00711OD12
8007110010
BO/06/09
XPOHTLIC
8007110019
B007 1 1 0009
BO/O6/23
70-1333
B007110O16
80D711OO14
80/06/13
71-2B1
B0071 10017
8007 1 1 0009
80/06/23
BO-330 -J
BOO? 11 0020
8007 1 1 0009
80/06/23
70-1333
B007110022
B007 1 1 0009
BO/06/53
7O-1333
BQO7110023
8007110009
BO/06/23
70-1333
8007110024
B007110009
BO/06/H3
70-1333
80071 1 0027
9007 1 1 0025
80/09/28
40-2061
900711-0028
8O07 1 1 0009
80/06/33
50-239 J
B007 110030
B007 1 1 0009
80/06/23
50-88? J
B0071 10032
B0071 1O009
BO/OA/aa
50-320 J
BOOTH 0036
B0071 10033
80/06/13
&0-275 E
a 0071 10037
80071 10009
BO/OA/a3
S 0-320 O
8007110039
0007] 1O034
30/06/24
30-327 0
6007110040
B007] 10009
BO/06/B3
30-320 J
8007110046
8007110009
90/06/33
50-330 J
B0071 100*9
B 0071 10044
80/06/04
30-263 Q
B007110051
8007110009
BO/06 /23
50-330 J
8007110053
8007110009
8O/06/23
50-320 J
B007I100S7
8007110009
80/06 /?3
30-330 J
ENCLOSURE
PRINCIPAL
DOCUMENT
DATE
ISSUED
SUBJECT
CATEGORY
BCD? 11 0060
8007110062
B007110065
B0071 1006B
B007110O70
B007 110009
8007 11 0009
B0071 10061
0007110009
8007110061
BO/06/B3
BO/06/23
80/03/21
80/06/33
80/03/21
30-320 d
30-32O J
30-382 0
30-320 J
90-382 a
8007110O72
8007110076
B007110O77
BOO? 110034
8007110OB9
8007110009
8007110061
B 0071 10009
8007110009
B0071100O9
80/06/23
80/03/21
BO/06/23
80/06/23
BO/ 06/23
90-320 J
30-382 Q
30-32O J
50-320 J
30-320 J
80071 I OO91
B007110O93
80071 10O93
800711009*
8O07110O9B
BOO? 110007
80071100B3
B 007 11 0009
8007110086
BOO71100O9
BO/06/33
80/06/23
BO/06/23
BO/06/20
BO/06/23
90-32O J
30-271 H
30-320 J
90-285 Q
30-330 J
8007110103
BO07110107
BOO? 11 01 13
8007110123
80071 1012B
8007110009
B007110009
BOO71101D3
8007110009
B 007 11 0009
80/06/23
80/06/23
80/06/19
BO/06/23
80/06/23
30-320 J
30-320 J
30-335 Q
30-320 J
30-320 J
8007110132
B0071 10135
8007110136
B007110140
BO07110143
B007110009
8d071 1 0009
8007110131
8007110009
8007110009
80/06/23
BO/06/23
80/06/20
80/06/23
BO/06/23
flO-320 J
30-320 J
30-254 Q
30-320 J
30-320 J
B007110143
8007110147
80071 101 51
8007110136
B007110198
8007110131
BOO? 11 0009
8007110009
BOO? 11 0009
8007110133
BO/06/20
80/06/23
80/06/23
80/06/23
80/03/20
30-354 0
30-320 J
30-320 J
30-320 J
50-461 0
B007110160
8007110166
B007110167
BO07il016B
BO07110173
0007110009
SO07110161
8O071 10009
SO07110153
8007110009
80/06/23
BO/06/13
80/06/23
80/03/20
80/06/23
50-320 J
71-7009
SO- 320 J
30-461 Q
50-320 J
8007110176
8007110170
8007110179
B0071101B4
8007110192
BOD7110009
8007110009
BOD71 10174
8007110174
B0071 10187
BO/06/23
BO/06/23
80/03/23
BO/05/23
80/03/23
30-320 J
30-320 J
30-206 Q
50-206 0
30-482 0
8OD7110193
B007110194
8007110196
BOD711019B
BO071 10201
8O071 10189
8O071101B7
B0071101B9
B0071101B7
8007110009
80/07/07
80/07/07
BO/07/07
80/03/23
BO/06/23
50-200 Q
30-200 Q
30-2BO Q
SO-4B2 Q
30-320 d
BOO? 11 02 03
8007110206
8007110207
8O0711020B
8007110209
8007110193
B007110200
8007110193
BOO? 11 0009
8007110204
BO/O6/O4
80/06/19
80/06/04
80/06/23
BO/07/07
NUREO
30-10 fl
NUREG
50-320 J
50-155 P
B0071 10210
8007110312
8007110217
80071 10220
B0071 10233
8007110204
B007110009
8007110009
B007110214
8007110009
BO/07/07
80/06/23
80/06/23
BO/06/20
BO/06/23
30-133 P
30-320 J
3D -3 2O J
30-346 a
30-320 d
B007110224
BO071 10231
BO071 10233
80071 10234
BO071 10239
8007110009
B0071 10223
BO071 10228
8O071 1 0229
8007110223
BO/O6/23
79/10/08
80/06/19
80/03/23
79/10/OB
30-320 d
PR
5O-461 O
30-443 Q
PR
BO071 10246
8007110248
80071 10234
8007110259
BOO? 11 0262
8007110242
8007110243
B007110247
BOO? 11 0250
B0071 10280
80/04/17
BO/03/16
00/06/06
BO/06/23
BO/06/23
FDIA
TQPfiEP
30-233 P
30-321 a
30-321 Q
8007110964
BOO? 11 0268
8007110270
BOO? 11 0276
800711 027B
B0071 10247
8007110250
B0071 10263
8007110230
8007110266
BO/06/06
BO/D6/23
BO/06/23
80/06/23
BO/06/12
50-233 P
30-381 0
71-6375
30-321 0
COMMISSION
8007110280
B0071 10282
B0071 10283
BOO? 11 0286
8007110290
8007110272
B0071 10266
B0071 10273
8007110272
BOO? 11 0281
80/06/24
BO/06/12
BO/06/12
BO/06/24
00/06/27
30-320 P
COMMISSION
XPORTLIC
50-320 P
71-9450
B0071 10292
8O071 10296
80071 10297
8O071103O1
BO0711Q313
BOO? 11 0272
B007110S66
BOO? 11 0266
B007110299
BOO? 11 0304
80/06/24
80/06/12
80/06/12
80/07/07
80/07/01
90-320 P
COMMISSION
COMMISSION
50-235 K
30-321 E
CROSS REFERENCE OF ENCLOSURES TO
PRINCIPAL DOCUMENTS
ACCESSION NUMBER
ENCLOSURE
PRINC1PAL
DDCUMENT
DATE
I 55UED
SUBJECT
CATEGORY
B007110314
BOO7110322
B007110323
8D071lD35/>
B007110327
8007110306
EOD71 10321
B00711O321
B007H0317
0007110321
BO/ 06/30
BO/ 06/27
BO/06/27
00/07/02
flO/06/27
30-335 H
M1SC
MIBC
30-303 S
H1SC
0007 11 032 B
H007110331
B007II0340
B007110343
B007110349
8007110-330
8007110374
8007110-333
80071 1O33Q
80071 1Q343
SO/O7/O2
8O/07/07
SO/ 07/O3
BO/06/ 30
BO/06/30
30-S1B 9
30-269 P
30-266 3
50-352 U
50-301 S
G007 1 10357
B007 110362
8007110363
8007110373
8007110376
B00711O333
B007UQ360
0007110364
B00711O370
B0071 10372
BO/07/03
BO/07/03
BQ./07/09
BO/07 /Ol
BO/06/27
50-301 S
50-269 S
30-339 P
30-319 9
50-327 S
9007110300
B0071103H2
B0071103B3
9007110397
80071103B9
Q007MO37B
8007110377
BOD711Q373
0007110377
B007110386
80/07/03
BQ/O6/24
8O/07/O1
BO/06/24
BO/07/07
50-396 5
COMMISSION
30-219 S
COMMISSION
30-309 Fi
8007110375
8007110374
B007 110393
B007 110397
B007110403
8007110377
8007110383
800711O377
B007I1Q391
BOOV11O400
00/06/24
HO/O7/O3
80/06/24
BO/07/03
00/06/30
COMMISSION
30-396 8
COMMISSION
50-346 8
30-321 S
0007110404
8007110406
B007 110410
8007110414
0007110416
B0071IO396
B007110405
B00711O4O2
8007110409
8007110407
BO/07/07
BO/07/03
BO/07/07
00/07/03
BO/07/03
50-247 S
50-324 H
50-302 S
50-235 H
50-346 B
B007 110417
BD07110419
BOQ7110423
B0071104H6
8007110434
8007110413
80071 1O4 11
B00711O41B
B007UO419
B007110427
BO/07/02
80/07/03
BO/07 /O3
BO/07/03
BO/07/02
50-116 S
30-331 B
30-346 S
30-331 S
30-346 S
8007110437
8007110413
0007110443
B00711041B
B007H04SO
BOO? 11 0429
BOO? 11 0432
B007 1 1 0439
8D0711Q440
80071 1O444
BO/06/30
BO/07/01
80/06/33
BO/O7/03
BO/07 /OB
90-366 B
50-321 8
NUDEO
50-346 S
30-27.J Q
B007110497
8007110439
8007 It 0461
8007110462
B007U0463
B00711O4S4
0007110434
BQ0711O432
8007110434
8007110455
BO/06/16
BO/06/ 16
BO/06/23
BO/06/16
BO/07/02
WA3TE MIJT
WASTE MOT
71-607B
UASTG HGT
90-3B1 S
B0071104&B
B007U0474
BQ07H0476
B007H0479
B007110482
8007110464
80071IO466
8007110473
8007110477
B0071 10471
BO/06/33
BO/07 /OS
BD/06/23
BD/OS/27
BO/07/03
71-9130
30-243 B
71-5926
50-35B a
30-331 B
0007110409
8007 It 01 B7
8007110493
8007110479
B007H049B
B00711047B
BOO? 11 0484
80071 1O47B
B007110484
B00711O4B4
BO/06/S6
BO/06/20
BO/06/26
BO/06/2Q
QO/06/20
50-320 P
BECY
50-330 P
SECY
SECY
B0071109O1
8007110303
B0071 10918
B0071105B1
80071 103S7
8007 1 1 O47B
80071 1O4B4
B00711O313
B007110S13
B00711OB13
BO/06 fSb
BO/06/HO
BO/06/23
BO/06/24
BO/06/24
so-aao P
SECY
70-<J25
50-424 0
30-424 fl
BOQ7110331
B007110536
8007110339
8007110353
8007110363
80071 1O313
B00711O313
B00711QS33
B0071 10346
B0071 10336
BO/06/21
80/06/24
BO/06/20
BO/Ofc/23
BO/06/26
30-424 0
90-4H4 H
CONTRACT
8Q-4B2 U
30-13S 0
B007110966
3007110960
B007110B71
BOQ7110373
B0071400O7
800-7110346
600-71 10546
8DO711O346
BOO7 1 1 OS72
800-7140004
BO/06/S3
BO/06/23
BO/06/33
B0/0(b/13
BO/07/09
30-4B2 U
50-482 U
SO-4B2 U
CONTRACT
30-369 Q
B0071400G9
B0071400IO
BQ071400I4
BQQ7 140022
B007 140034
BOO71400DB
80O71 40004
80O7140011
BOO714O018
BOO714O032
SO/06/ IB
00/07/09
BO/07/03
BO/07/07
BO/O7/09
SO-HB9 Q
50-369 0
PR
50-2B9 S
30-361 0
B007 140037
B007140Q39
BOO? 1400 40
8007140041
8007140048
BOO7MO033
B00714O033
B007I40036
B007 140035
8007 14 0033
80/06/12
BO/06/12
80/07/04
BO/Ofc/03
BO/06/12
OA999
OA999
PR
70- B
QA999
ACCESSION NUMJ5ER
ENCLOSURE
PRINClPrtt
EOCUMENT
DATE
ISSUED
SUBJECT
CftTEQOHV
B007140016
BOO 7 1400 36
SO/O7/04
PR
B007I40O4B
B007 140033
BO/OA/U
HA999
00071 4 OO49
80O7140O13
BO/O7/03
PR
0007140051
B007 110036
80/07/^04
PR
8007140039
a007!10O55
QO/06/'25
SECY
80071 40062
B007110OSO
90/O6/L33
SO-33O
U
B 007 14 0063
BOO 7 140 037
80/O6/11
QA999
6007340064
BOQ7140O3a
80/06/23
70- 1 43
B007U0066
00O-714006O
BO/O6/I3
SO-32O
G
B00714OO67
Q007140O5B
60/06/23
70-143
8007140068
B007140063
BO/O6/26
10LFH
B00714OO71
8007140060
BO/O6/13
90-320
0
B007U0073
0007110O3B
BO/O6/23
70- 1 43
B007H0073
8007140057
BO/O6/11
QA999
B007U0079
8007140074
60/06," IB
IOCFR
B007UOOB?
800714O037
BO/O6/11
QA999
8007140086
fl00714007B
BO/O6/ai
70-143
0007 140037
SO 07 140057
BO/O6/11
OA999
B007UOOB9
B007110O57
90/06/11
OA997
B007140O9O
BC-07J 40097
SO/03/05
30-397
U
B007140102
B007 110097
DO/OS/05
SO- 397
Q
B0071 40108
B00711O106
BO/O6/19
50-437
H
B00714011B
BOQ714O113
BO/ 06/09
50-277
H
8007140122
0007140121
79/07/02
BECY
8007140125
B007140123
BO/06/20
SO-2B9
P
80D714O13O
B007140t21
79/07/02
BECY
8007140135
B007I4O121
79/O7/O3
SECY
B00714013i<7
B00714Oi21
79/07/0?
SSCV
B007140153
9007140133
BO/O6/ia
50-239
Q
BO0714O161
B00714O133
BO/06/ IB
3O-S39
0
BOO 71 4O 174
8007140169
90/03/28
50-2BO
a
8007 UO 179
80071 401 7O
80/07/03
30-387
B
B007140190
B0071401B2
HO/06/ IB
50-S47
P
8007140172
B00714O1B6
80/06/35
50-282
0
B007 140203
BOQ714O200
BO/O6/3Q
CONTRACT
B00714O217
9007140207
BO/07/03
50-528
S
B0071 40320
300714021?
60/06/36
FdlA
B00714O225
9007140207
BO/07/O7
5O-339
B
B007UOH27
8007140221
BO/06/36
30-409
H
8007140231
8007140230
BO/06/27
30- iO
H
80O7UO299
B007140249
80/07/C3
50-2BO
S
8007U0265
B007I40a3(i
80/06/11
5O-346
M
B007 140271
B007I1O266
flO/06/30
KPCRTLIC
B0071402B9
B00714O2B3
OO/06/27
XPCRTL1C
B007140291
G00714Q277
ea/06/26
FOTA
B007 140297
8007140277
BO/06/ ah
FOIA
BOO7UO303
8007140377
BO/06/26
Fni/i
8097110315
BOQ714O312
BO/O7/01
30-341
n
H0071403S2
Q007 140318
BO/O7/09
30-346
R
B00714032Q
BO 07 1 4O32O
ao/07/u
50-1D4
K
BOO7HO331
8007140327
BO/07/07
30-295
n
BOO7MO34J
8007140337
BO/07/03
30-32B
Q
B00714O34S
B007I4033H
BO/O7/09
30-29
P
DO07140353
BOO/HO349
BO/O7/03
50-318
H
DQ0714037S
B00714O364
SO/06/3O
30-335
3
B00714O373
BOQ7 140367
BO/06/16
TOPHiEP
B00714O374
Q00714O36B
GO/07/07
30-333
B
B00714O377
800714036?
BO/07/ 1 1
30-3 5B
K
8007140378
8007140370
BO/07/09
30-432
O
6007MO379
8007140367
BO/O6/I6
TDPREP
8007140380
B007140371
SO/O7/07
1)0-399
80071403B*?
B00714O3S2
80/06/29
5O-33D
S
8007140394
B00714O3H3
BO/07/07
30-333
S
B007I40390
G00714O392
BO/07/OB
50-3
P
B007140399
BO 07 140395
BO/07/OB
30-324
a
BOO7 1 4O400
B007I10393
00/07/U
50-33B
p
BOO71404O'5
B007I40396
QO/07/07
50-360
8
H0071 40400
B00714040a
OO/O7/1O
PR
8007140411
B00714O4O6
BO/07/I 1
3O-339
P
B007140416
OOQ71404O7
BO/O6/16
TOP REP
BOO7140417
B007140402
80/07/1O
PR
B007 140430
B00714O4O7
BO/06/16
TOP HEP
8007140427
B007140422
BO/ 07/03
30-390
8
9007140438
B007140424
BO/ 07/0-9
50-155
Cl
8007140439
B00714O132
BO/O7/07
PR
B007 140441
8007140436
80/OS/gB
50-38E
Q
B00714O4-42
0007140431
80/07/03
30-33 1
P
B007 140447
^007140436
BO/05/S9
30-3B2
0
B00714O449
B00714043.2
BO/07/07
PR
BOO714O450
B00714O434
BO/O7/03
50-331
P
502
CROSS REFERENCE OF ENCLOSURES TO
PRINCIPAL DOCUMENTS
ACCEBSIDN NUMBER
ACCESSION NUMBER
ENCLOSURE
PRINCIPAL
DOCUMENT
DATE
1 SSUED
SUBJECT
CATEGORY
8007140496
80-07140443
8-0/07/07
30-32B S
BOO7 1 4047 1
B00714O4A4
BO/06/17
50-346 a
BOO7 140473
B0071flOfl6l
BO/04/3H
30-269 G
B00714D4B1
B007140470
BO/06/25
30-341 0
8007140456
8007140400
BO /04./24
30-298 P
BOD71401BB
8007140461
BO/04/28
50-269 0
fl 007 14 0493
8007I404BO
8O/06/34
50-296 P
BOQ714O493
S00714Q4B3
00/05/27
30-155 0
8007140491
B007 140487
80/05/30
50-263 0
B007140302
8007 1 40497
BO/06/19
30-445 0
0007140504
B007140W
BO/07 /1 0
FD1A
DO 07 110 JOS
Q007140300
BO/ 06/26
50-231 P
B007I40S07
8007140300
BO/06/26
50-234 P
80071405)4
B007HO500
80/06 /Si.
50-234 P
8007140921
BQ07140312
8Q/O7/03
CONTRACT
B00714032fe
80071 40 523
BO/03/ 19
90-4B3 0
8007110337
B00711Q513
SO/05/ 16
70-143
8007140540
B007140531
BO/06/06
ACR5
BOO71 40541
8O07I 40533
00/03/19
50-483 0
B007I4034&
0007140539
BD/0&/2O
BECY
80071 40953
BO07140542
SO/O6/ 3 S
90-297 fl
80O714OS5B
8O0714O&48
BO/03/B7
go -346 Q
8007140360
8007140352
40/06/IB
SECY
B007 140970
B007140372
00/07/01
REGOD
8007140607
B007140AOO
80/06/13
40-8903
BOO? 1 40AOB
8007*40604
BO/05/21
S7-4B
BOD714Q609
B00714O604
BO/09/21
27-40
80O7I40614
B007J40605
BO/07/01
50-325 P
B007 140618
8007 1 4O6O5
00/07/01
50-323 P
80O7140620
BOO? 1406 13
SO/Ofr/20
71-6394
60071 4O624
B00714O605
BO/O7/01
30-325 P
B00714Q6B5
BD07140616
BO/O7/02
30-320 H
BOO7I4O62B
BOO7 1 40623
80/O6/13
50-344 P
B007140629
B007140616
BO/07/02
50-3 SO H
B007 140631
B007140627
00/09/21
4D-B702
8007140632
B007140623
80/06/13
50-244 P
8007140633
B007I40626
BO/06/05
CONTRACT
B007 140636
•B007140623
00/06/13
5P-244 P
BOO71 40637
0007140630
BO/O4/19
TOPHEP
B007140643
8007140639
BO/06/19
TOPREP
B007140648
8007140644
BO/O5/21
70-133
8007140649
BOD714Q64&
BO/O7/02
7I-63B7
B0071406S4
BO 071 40646
BO/07/O2
71-4387
B007 14043d.
B007140643
60/07/0-9
FOIA
B007 1 40497
BO 071 406 53
80/O3/2 1
40-2940
80071406 SB
BOO7140646
BO/07/OE
71-6387
8007140663
BOO7140646
BO/O7/OH
71-63B7
0007140663
B007140653
BO/05/21
40-2940
8007140666
B0071 40646
flD/07/02
71-6307
B00714066B
B007140646
BO/O7/OB
71--63B7
8007140670
B007 140633
BO/05/21
40-2940
8007140673
B007 140644
BO/&7/02
71-63B7
3007140678
0007140646
BO/07/02
71-63B7
80O71406B2
aoo7UOfi?a
80/07/02
70-1193
00071 4 06B7
B007 140616
BO/07/02
71-63B7
B0071 40690
80071 40646
80/07/02
71-63B7
BOO7140702
B007H0690
80/07/01
71-346
8007140709
8OO71407O&
BO/07/01
71-3
8O07190OQ6
3007 IS 0002
BO/06/30
50-183 Q
BO07 190009
8007130007
00/06/30
30-490 Q
BD0713DO10
80071 9000B
BO/06/30
90-4B3 0
8007130019
8007 i 300 19
80/06/23
30-369 (1
8007130021
6007130015
BO/O6/23
30-S6-J Q
8007130023
H007J30O17
80/06/04
50-4B3 0
BOO71 30031
B007 150027
80/06/17
70-1113
7
70-1113.
t
SO-1S4 P
•" IB4 P
113
•LK
ENCLOSURE
PRINCIPAL
DOCUMENT
DATE
ISSUED
SUBJECT
CATEGORY
B007130107
BOO71300B7
00/06/24
90-261
Q
8007130108
BOQ71301Q3
BO/06/30
30-39B
0
B007130110
0007130113
80/06/06
30-454
O
B007150120
B007130106
80/07/02
30-344
a
B007130124
BOO7130106
BO/O7/02
90-344
a
B0071 301H6
BOQ7150106
00/07/02
30-344
Q
8007130130
B007150106
BO/07/02
30-344
0
B007130139
BQ07I9013B
80/06/19
70-364
8007:1 50 136
B0071501B3
BO/06/O6
30-29B
0
B0071S0141
80071 901 SB
80/06/19
70-3&4
8007130140
B00713012B
80/06/19
70-364
B007130130
0007130128
BO/06/19
70-364
BOQ713O136
B00713012H
00/06/19
70-364
0OQ7150163
B00719013B
80/06/19
70-344
B0071 30171
8007130149
BO/O6/04
30-BB3
d
8007190318
80O71 3031 4
SO/04/ 10
70-2691
00071 30323
8007150314
80/04/10
70-2691
B0071 30332
8007190314
BO/ 04/10
70-2631
BOO? 1504 92
8007 190447
00/06/03
30-366
a
8007130466
00071 30433
80/07/07
90-327
a
8007150463
00,07180462
BO/06/20
30-280
0
0007130471
B0071 30442
BO/06/2O
SO-200
a
B0071304BB
BOO7 130470
00/07/08
30-327
s
B007130494
0007130489
BO/06/26
90-313
p
0007 150501
B007 150491
80/07/10
30-337
s
B007 1309-02
B007J 30499
80/07/00
30-320
p
BOO? 1303 03
8007130499
BO/06/B9
30-302
a
000713030*.
B007130493
BO/06/39
30-302
a
8007190908
000-71 30496
BO/O7/OB
90-321
s
B007130310
B0071 30493
80/06/25
9O -302
0
B007130311
B0071 90493
80/06/25
50-302
Q
8007190312
8007190304
BO/07/07
30-327
B
8007130914
B007130513
BO/O7/09
30-320
S
B0071S0817
B007150316
00/07/07
80-872
8
0007130319
8007190913
80/07/09
30-320
0
B007IS03BO
8007190918
80/07/09
70-143
0007130933
0007190321
00/07/09
30-327
P
B007 190336
B0071 30932
BO/07/07
30-339
B
8007190337
6007190339
80/07/08
30-373
A
B007 130338
8007130330
80/07/11
30-313
8
00071 305-14
0007190339
00/07/03
90-321
B
B007 190847
8007130942
BO/07/09
30-313
n
0007130536
8007190327
80/07/11
30-312
0
00071 30361
8007130553
80/07/09
30-316
R
BO07 130342
B0071 30999
80/07/10
30-106
H
B007 150566
8007130960
80/07/10
30-346
B
Q007 190973
8007190968
80/07/07
30-133
R
B0071S0374
8007130970
BO/07/ 1O
90-239
8
B0071B037B
B0071 9037 1
80/07/11
30-327
P
80O71903BK
B007 130971
BO/07/H
90-327
P
B0071303B3
8007 130879
BO/07/11
30-349
P
B0071S03B9
8007130380
80/07/09
30-327
0
B0071503B7
80071 30979
BO/07/09
90-204
P
BOO? 190990
8007190984
80/07/09
30-344
R
B007 190392
B0071909BB
BO/07/07
30-312
ft
8007150397
B0071309B6
BO/07/OB
30-313
9
00071 306Q3
8007130999
BO/07/10
90-313
B
B007 130604
B0071 90396
BO/07/ 10
30-272
R
B0071 306Q3
B0071 90399
80/07/08
90-206
R
8007130614
8007130611
80/07/09
9Q-B63
R
B0071S061S
8007130610
BO/07/10
30-266
R
B007 190620
8007130613
BO/07/OB
30-326
R
BOO7 130623
0007150384
BO/O7/OB
30-313
8
B007 150629
B007190619
BO/07/01
90-SS34
R
B0071 506BB
8007190621
BO/07/OB
90-273
B
B0071 90633
8007190429
80/07/10
90-861
R
8007190636
B0071 80427
BO/07/03
30-335
8
8007190642
0007190633
80/07/03
50-366
8
0007150630
B007 190641
BO/07/07
90-313
B
B0071 50691
H007 130644
BO/06/16
40-8902
8007190632
80071 90646
BO/06/ 16
TQPREP
BOO7190636
80071 00644
80/06/16
TDPREP
0007 13069 7
8007 1 90444
BO/06/16
40-8902
B00719066O
0007190647
BO/07/09
30-360
S
8007130663
6007100699
BO/07/11
30-366
0
B007 1S0463
B007 190654
SO/07/11
50-323
8
0007130667
BOD71 50644
BO/06/16
40-8902
8007130668
H00719066E
BO/ 07/11
90-348
R
8007130674
8007190666
00/07/08
30-321
S
BQO7 130679
800719067B
BO/07/OB
00-272
B
CROSS REFERENCE OF ENCLOSURES TO
PRINCIPAL DOCUMENTS
ACCESSION NUMTJER
ACCESSION NUMBER
ENCLOSURE
PRINCIPAL
DOCUMENT
DATE
I 3SUED
SUBJECT
CATEflDRY
0007150633
B007 1 5&6 /B
80/O7/07
50-36b B
BOO? 130693
BOO71S06B3
BO/07 /09
30-3t,B S
BOO7130695
QOO71SOiB4
QO/07/08
50-316 S
B0071507O1
8007130686
BO/07/07
50-330 6
800715070,3
00O7 150696
BO/07/10
50-319 S
B0071507O4
0007150699
BQ/O7/00
50-373 [I
B0071307I2
0007130703
BO/O7/OB
50-219 R
B00713O713
BOO7 1 HO70B
80/O7/09
50-303 H
B007 1 307 1 5
8007 1 30707
BO/07/10
30-333 S
B007 1 3O777
B007 150767
80/07/10
•50-33B S
8007150778
Q0071 30770
BO/06/ 1H
DHG
80071908Q6
80071 90BQ3
BO/07 /09
50-255 0
800713QB14
80071 30B09
BO/Os/09
70-364
00071 SOB 13
B0071BOBOB
80/O7/07
50-339 S
B007130B17
90071 30B 10
BO/O7/07
90-339 S
BOO? 1 50056
80071 S0820
BO/07/09
90-344 S
800716O1O9
B007 160096
BO/06/ 17
OA997
B00716QU3
B0071 60096
OO/OA/17
OA999
6007160131
8007160096
80/06/17
OA999
80071 601 S6
8007160096
BO/O6/17
Q/1999
0007160146
8007 16O 133
8O/O5/OI
OA999
8007160137
B0071601BO
OO/Oft/14
QA999
B0071 60171
B007I6Q161
BO/O3/I9
OA999
80071 60 ICfl
8007I6O177
80/06/17
QA999
B007160193
BOO716O177
BO/06/17
QA999
8007160202
BO0716O177
8O/O6/17
OA999
0007 160207
B007160177
BO/06/17
GA999
3007160237
BQ0716020B
00/O7/03
CBNTRMT
80071 603 I 7
B0071 60310
QO/O7/OI
71-391
6007160335
BOO71 60322
00/O7/01
71-3B9
8007160347
0007160343
BO/ 07/01
71-393
6007160372
80071 6O363
0O/06/37
50-344 P
8007160376
B00716O3&S
BO/06/B7
30-344 P
B007 160379
8007160363
BO/Q6/27
80-34 fl P
B007 160387
800716O3B1
00/07/07
71-1BB3
0007160399
8007160372
60/07/07
SO-373 A
8007160397
8007160393
BO/Ot,/lB
OA999
80071603-79
0Q0716O394
BO/07/01
KPORTL1C
8007160404
8007160393
Boyob/ia
OA999
B007 160408
0007 1 6O393
80/O6/1S
OA999
BQ07160411
B0071 60393
BO/06/1B
OA999
0007 1604 12
B007160409
BO/ 07/07
71-1986
B0071604E9
80071604^1
80/0&/02
30-29 P
8007140437
800716O421
BO/06/O2
30-29 P
BOO? 160434
B00716O4H9
BO/06/1H
S0-Bi9 P
B0071 604-1 S
8007 160129
BO/O6/12
30-36? P
8007160433
8007160429
QO/06/ia
30-369 P
0007160463
8007160439
BO/Ofi/19
30-1Q P
B007 160474
8007160464
80/07/07
5D-3O3 S
0007160479
800/160471
80/07/11
50-337 P
000716047"?
B007 160469
BO/06/1O
30-346 0
80071 604 B4
80O716047I
00/07/11
30-327 P
S0071 604 96
80O7 160490
BO/06/11?
CONTRACT
80071 604 98
BOO7 1 6O490
80/06/19
CONTRACT
8007160302
BOO7 1 6O403
BO/O7/11
SO-3-Q3 S
0007160304
8007160490
BO/06/19
CONTRACT
0007160310
B007I 60483
00/07/11
30-303 8
8007160313
80O7 160490
80/06/19
CONTRACT
BOO? 1603 IB
80071 60S 14
BO/O7/II
30-113 S
8007160521
8007160320
00/07/10
SO-S73 A
B0071603.33
0007160319
ao/07/ii
90-337 S
8007160S23
80071 t03S2
BO/OA/30
30-320 B
B007 160326
0007160S24
00/07/1!
90-aB9 S
80071 AO 348
BQO71&0544
BO/07/09
30-303 R
B00716Q33I
80071 6054 6
0O/O7/OB
SO-&3D 3
80071 6QSS6
80071 (.0333
BO/O7/10
30-359 R
8007160S62
8007160998
00/07/11
50-332 R
8007160564
8007)60339
80/07/0^
90-334 P
B0071 60565
B0071 60960
BO/O7/OB
50-466 ft
B007 160566
0007160339
BO/O7/03
90-434 V.
8007160369
8007140359
80/O7/03
SO~4S4 K
8007160374
8007160339
BO/O7/03
30-431 K
8007160S7B
80O7160S71
ao/oi/ia
50-3afl S
8007160409
00O7160t04
BO/07/11
SO-49B B
8007160617
BOO7 160610
BO/04/ 11
30-416 A
B007 160633
H00716061B
ao/07/n
50-2B9 B
BOO 7 160633
8007 1 60628
BO/O7/07
50-311 P
0007160638
B007 160626
30/O7/OB
BO-46I S
8007160MB
0007160641
BO/O7/03
50-393 3
8007160649
BOO7 160634
HO/07/OV
50-3S9 M
ENCLOSURE
PRINCIPAL
DOCUMENT
DATE
1 SSUSD
bUUJECT
/
0007160651
8007 1 60626
BO/ 07 /OB
•iO-461
S
8007160654
BQQ716O617
BO/07/09
5O-334
a
B0071&O6S6
8007 160651)
BO/O7/0/
3O-43B
fi
B00716065B
8007160652
BO/ 07/09
9(>-b2S
c,
B007 160662
BOD716«65i
00/07/07
'10-J95
'=
BQ07 160663
B007 1606^7
BO/07/07
10-J69
CJ
B0Q7160663
BO0716O&26
00/OV/OU
5O-4A1
'i
H007160672
B007 1 6O66B
BO/O6/3/
30-304
3
SO 07 16 0679
BDO7 1 60626
BO/07/OB
3O-061
5
BO-071606HO
900716O676
6O/O7/O9
10-341
H
B0071606B1
8007160677
{30/O7/OE3
•j 0-4 09
It
BOO? 160694
BQ071606B7
HO/07/OB
DO-341
A
80D716O69B
BQ0716O67S
BO/O7/OB
1O-274
F
0007U0703
80071 606 B/
BO/07/Ot!
50-341
ft
0007160709
B00716O6B7
BO/07 /OR
SO -341
ft
ao0716071D
80O7160700
BO/06/ J7
4O-79B.2
•B00716O721
BOO 7 1607 00
BO/O6/37
flO-79fl2
B 007 16 0727
8007 1607 IB
BO/06/ 37
70-11 U
fl 007 16 0734
8QQ7160725
BO/O6/O1
50-44-0
0
B007U0741
BOD716O725
BO/06/ 04
•kO-440
n
BOO? 16.0742
800716O732
00/06/0^
90-3 ]B
ti
B0071 60753
8007160743
BO/06/16
TOPfiFP
BOO? 16 07 56
8007160751
UO/06/11
30-461
a
BOO? 160761
0007160745
00/07/01
50-33R
Q
B007 160764
8007160731
SO/06/11
3O-461
«
BOO7 1 6O765
B007 160743
BO/06/16
TOPFIEP
8007160773
B007I60767
BO/0^/O7
71-393
BOD7160B10
BOO 7 160 7 97
BO/Oh/30
30-3J3
(1
8007160314
BO 07 160 BOS
BO/Ot/19
fiEGQD
8007 1 60S 17
BQO-716O797
00/06/3O
50-33&
(1
BOO? 1 60826
0007160797
80/06/30
50-333
ft
BOO? 1 60830
8007160797
00/06/30
3O-33^
0
BOO? 1 60843
OQ0716OQ3B
80/06/27
70-143
B007160B51
80071 6Q94B
00/06/04
CDHMlSSICirt
80O7 1 60B5tJ
BC07160B54
BO/06/04
conni-i'SK
3H
8007160B62
B007160Q60
00/07/01
50-416
<j
8007160B66
0007160360
00/07/01
30-416
0
H00716OB67
B007I60B63
BO/06/23
30-322
ft
8007 1 6OB69
B007160D60
BO/07/01
5O-416
ft
8007160B70
B007I60B60
BO/07 /OJ
90-416
ft
BOO? 16087 2
8007160060
BO/07/01
3O-416
0
B007 170031
000717OO49
BO/07/02
50-206
II
BOO? 170037
BQ07170049
BO/O7/O2
30-2O6
H
BOO? 170071
B007170066
BO/06/16
30-:il7
P
80071700B3
00071700H4
H0/0(./iy
50-133
Q
8007170097
G007170093
GO/07/ 07
71-5141
8007 1 7O09B
6007 17 0091
no/oa/29
30-373
•<i
8007170103
00071 70094
HO/0-&/39
30-373
U
000717O11B
8007170113
BO/O7/09
M-3B62
8007170127
8007170123
BO/O7/OB
CONTRACT
B007170145
EJ 007170135
BO/O7/10
CONTH/1CT
B00717O161
0007170137
ao/07/oa
CtlNTflACT
B007170171
B007J701B9
80/O7/OB
30-466
a
8007 I 7Q 172
B007170t67
00/06/09
CUMRACT
8007 1701 B3
B00717OI79
BO/07/14
30-139
p
800717O1B9
B007170179
BO/07/J4
30-:t39
p
8007 17O 194
0007 1701 06
BO/ 06/30
50-30C.
a
B007170216
B00717O212
60/06/30
CONTR/ICT
B00717Q3HQ
8007170215
BO/0// J 9
70-130B
B007170221
800717O319
oo/ofi/oa
90-32/
o
BOO 7 170233
B007170317
00/Ofa/Et
LOMTHAfl
BOO7I70224
BOO? 1702 19
ao/06/oa
SO -327
(i
80071703:51
B007 1 70344
ao/07/oi
sn v
800-7170237
BOO? 1 70349
BO/06/O3
90~'.1H/
o
B00717023B
8007 170244
BO/07/01
BUCV
8007170263
B00717O233
Bn/O6/26
XPORTL1C
0007170366
0007170364
ao/06/of
30-219
ci
8007170270
0007170265
00/03/20
HO-52B
0
B007 170371
0007170264
BO/06/Oa
90-^19
0
B007I70274
BOO? 1 703A9
BO/O3/3O
•50-334
0
800717O27&
B00717O264
BO/06/OB
&0-^19
C)
OOO717O377
B007170254
00/07/OH
ISt at* Pr<
Jy
BOO717O28S
8007 1 7O2B 1
BO/O7/ 1 1
30-'1 13
|
000717O386
BQ07170264
00/06/02
30-B19
(1
BO071702EF3
8007 1 703 (f 3
BO/05/30
111 -.12 J
(1
0007170292
80071702611
BO/O6/OJ
KOI A
B007 170391
8007170290
BO/07 / 1 J
50-11 b
i;
0007170396
B007I/OEOE1
00/07/01
lOrm
BQ07I70Z97
B007 170291
OO/Od/ 1 (J
4{J-b)60i.'
6QO717Q29B
B00717O364
ao/06/o?
[-OIA
B04
CROSS REFERENCE OF ENCLOSURES TO
PRINCIPAL DOCUMENTS
ACCESSION NUMBER
ACCESSION NUMBER
ENCLOSURE
PRINCIPAL
BOCIWIENT
BATE
ISSUED
EUDJECT
CftTEGDRY
0007170302
B007 170291
BO/06/10
40-8603
B00717O304
BOO717O26-1
BO/06/02
FD1A
S0071 70303
BO07 1 7O30O
80/06/16
70-935
BOO717O30fa
BOO7170B64
EO/06./02
FD1A
3007170308
B00717O291
80/06/10
40-8602
8007170310
BOO717O30O
80/06/1 fi
70-925
B007170314
B00717O261
00/O6/02
F01A
B007170317
B007170313
80/07/03
50-4B2
A
B00717031B
Q0071 70364
BO/O6/O2
FOIA
BQ07I70322
B007J70264
80/06/03
70-1B69
8007170324
B007 170264
BO/06/03
70-1B69
8007170326
BOO717O264
80/06/02
FDIA
80071703EB
B007 170364
GO/06/02
FDIA
B007170329
a 007 170327
80/06/11
40-86B1
B007170330
9007170333
ao/o(./ 1 •;
30-10
a
B007170331
8007170337
BO/06/ 11
40-B6B1
0007170332
BOO717O327
SO/06/ 11
40-B68I
B007170333
BO07S7O323
BO/06/19
30-10
0
0007170333
B0071703S7
80/06/11
40-B6B1
8007170336
BOO717O323
GO/06/ 19
30-10
G
B007 170337
BO071 70264
BO/06/03
70-1B69
B007170340
B00717033B
BO/O7/OS
30-320
P
B00717O341
B007 170264
BO/06/02
70-1869
BOO 7 1703-4 4
B007 170342
BO/07/10
50-566
S
BOO717O345
BO0717O264
80/06/02
70-1869
B007170347
HO07170339
80/07/03
30-322
A
8007 17034?
8 D 07 170 364
ao/chfos
70-1069
8007170350
BOO717034B
BO/O7/I 3
50-2BQ
V
8007170351
0007170339
BO/07/03
50-333
A
0007170333
BO07 170332
80/07 /H
50-317
•P
0007 1 7035 5
BO07I 70354
BO/07/15
50-155
•0
BOO7 170358
B0071703S6
80/07/10
30-366
€
BOO7 170339
QOO717O337
BO/07/07
50-330
0
B007 17O36 1
80071703*0
80/07 / 1 1
50-22O
R
EJ00717O365
HOO717036D
BO/D6/30
30-3
R
EJ007 170367
8007170366
BO/06/26
50-400
K
B007 170371
3007170369
80/07/15
30-336
0
8007170379
0007170376
BO/07/ 01
50-28^
R
BOO717O3B7
SGO71703B2
BO/07/ 08
50-331
E
8007170391
80071703H9
BO/O7/14
SO -2 BO
1)
8007 170394
8007170393
30/07/16
30-230
P
BOO717O397
80071703-73
80/07/16
50-230
P
8007 170399
0007170264
BO/06/03
FOIA
8007170900
BO 07 170396
BO/07/10
50-416
B
BOO7 170402
BO 07 1 70264
BO/06/03
FOIA
8007170403
BO07I70393
BO/07/16
30-820
P
8007 1 70407
B007I70264
BO/06/ 02
70-1869
BOO? 1 70408
BOO7170392
BO/07/OB
1)0-331
5
BD07170410
BOO 7 1704 03
80/O7/OB
50-366
5
BQO717O411
BOO7170264
flO/Ofi/03
FOIA
B007170416
8007170264
80/06/02
FDIA
BOO? 170418
0007170413
80/O6/20
COMMISSION
8007170419
8007170414
60/07/10
30-331
B
8007170421
8007170417
BO/O7/07
TOPREP
B007170437
8007170423
BO/06/ 1 B
30-316
P
B007170429
B007I 70420
00/06/06
SO-324
Q
B007170431
BOO 7 170423
80/06/1-0
50-316
P
B007170438
B007170S.6*
00/06/03
FOIA
BOO7170434
B00717O423
DO/06/ Hi
50-316
P
B007 170436
8007170433
flO/Ob/13
4O-B74D
BOD7 170433
BOQ7170SM
80/06/02
FDIA
BOO7 170440
BOO 7 170433
80/06/13
40-8749
BOO717O443
8007170439
BO/07/03
00-117
P
BOO7170445
B007170439
80/07/03
50-337
P
BOO? 17 0446
8007170442
BO/O7/C9
30-3^0
P
B00717044B
8007170137
BO/07/1O
50-311
S
0007170449
8007170439
SO/07/03
90-339
P
8007170450
BOQ7I70<H1
BO/07/ 11
30-346
H
8007170433
B007170442
BO/ 07/09
50-:]20
P
80O7170433
B00717044H
BO/ 07/09
3O-320
P
BOO7I704SB
8007170142
00/07/09
50-320
!'
6007170461
8007 1 70457
BO/ 07/02
90-J46
P
BQ07170463
8007170451
80/07/OB
50-331
S
BOO? 170 464
8007170443
00/07/09
30-320
P
B007170466
B007170442
BO/O7/09
50-330
P
fl007170it6B
B007170453
BO/07/09
30-366
3
0007170469
B007170457
BO/07/PE!
50-346
P
8007170*73
8007170443
BO/07/OV
SO-3SO
P
B007170477
8007170437
80/07/03
SO-346
P
B00717047B
8007I7044S
BO/O7/O<J
30-3SO
P
ENCLOSURE
PFUNCIPAL
DOCUMENT
DATE
ISSUED
8UBJECT
CATEGORY
8007170483
SQO71704B3
80O7170488
60O7 170490
H0071 70493
8007170442
B0071 70472
8007170442
B007170442
B007170470
BO/07/01?
00/06/30
BO/O7/O9
BO/07/09
80/07/09
50-320 P
30-344 P
30-320 P
30-32O P
90-980 B
80Q7 170497
0007170499
SQO7 170302
8007170303
B007 170303
B007 170481
8007170442
B007170442
8007170496
B00717O442
BO/07/OB
BO/O7/O9
00/07/0"?
BO/O7/O1
80/07/09
90-331 B
30-32O P
90-3SO P
90-327 P
90-320 P
HQO7 170508
SOQ7170S11
BOO717O317
SOO7 170931
BOO7J 70325
B00717O496
8007170442
8007170496
8007170442
B00717Q9I3
80/07/01
BO/O7/O9
BO/07/01
BO/07/09
00/07/11
90-337 P
9O-32O P
90-327 P
30-32O P
50-390 B
0007170333
BQ0717Q334
BO 071 7-033 S
B007170339
0007170542
B007170443
B 007 170323
B 007 170442
0007170530
Q00717053B
00/07/09
BO/07/01
80/07/09
SO/05/80
80/07/02
90-32O P
SECY
30-330 P
50-361 Q
30-528 0
BOD717O350
80O717O396
8007170365
80O717G366
8QO7170S67
H 007 170943
S007170943
8007170361
8007170960
8007170939
80/06/10
BO/06/10
80/07/O1
BO/07/14
80/06/19
30-313 Q
90-313 Q
50-2 O6 Q
90-260 P
50-533 Q
BOO717036B
BOO7 170369
BOO7 170373
BOO7 170374
BOO71 70379
B0071 70963
8007170361
B0071 70961
8007170360
B007170961
00/07/01
BO/O7/O1
80/07/01
BO/07/14
00/07/01
90-344 R
30-206 Q
30-206 0
30-860 P
30-206 B
B0071703B4
B007I703B5
0007170596
B007 170399
0007170604
B007 170959
0007170577
B007 170309
0007170593
8007170597
BO/Oi/19
80/07/11
00/06/12
00/03/33
BO/07/03
90-993 Q
30-460 B
90-443 B
30-363 Q
10CFH
BOQ717O611
BOQ7170612
BQG7 170630
BOO7 170633
00071706.39
B 007 170606
8007170607
SO07 170622
B007I70625
0007I7062B
00/05/HI
BO/07/14
BO/09/2B
BO/06/30
80/06/26
30-206 0
50-395 A
70-133
50-329 Q
30-40O A
0007170643
B00717O&96
8007170663
B007170669
80O717O66B
0007170637
0007170647
8007170632
8007170694
B007170660
00/03/28
00/07/03
BO/06/S6
BO/06/17
BO/07/03
50-3B7 Q
30-270 P
30-400 C
30-394 0
WASTE HOT
00O7 170670
00Q717067B
00071706B1
B007170&B3
B0071706B6
BO07170654
0007170632
BO07170673
0007170634
B007170632
80/06/17
00/06/86
BO/07/OJ
00/06/17
BO/OA/26
30-334 0
30-400 C
NIBC
90-334 0
30-400 C
BOO7 170693
B0071BOQ07
0007100010
00071B0011
BOOT! BOO 12
80071 7 06B8
80071S0004
8007180003
80071 a 0005
0007180004
BO/03/2B
BO/03/30
80/07/01
80/06/03
00/05/30
30-219 0
30-320 P
30-10 0
50-327 Q
30-380 P
80071 BOO IB
B0071 BOO3H
8007180029
8007180O34
8007100046
8007100014
BO07IB0017
B00710D023
B007IB0029
B007 180044
00/03/23
BO/06/04
80/03/23
BO/06/ IS
80/06/27
50-206 0
StatB Prog
90-900 0
COMMISSION
90-206 P
B0071BOQ47
SOO71BD091
aOO71000S3
BOO? 1 BOO 63
B0071BO066
8007180042
B0071 80044
B0071 80044
0007180060
B0071B003B
80/06/03
00/06/27
BO/06/27
80/09/14
BO/06/B7
30-322 H
30-SB6 P
30-286 P
80-219 H
70-371
B00710O070
S0071B0071
B0071000B2
BD071BO101
B0071B0110
B0071B0061
0007180090
B00718003B
B0071B0077
8DO7 180107
BO/07/O1
BO/06/27
BO/06/27
BO/09/23
8O/07/O2
30-337 P
70-371
70-371
30-393 Q
90-320 hi
B0071BO122
8007 ISO 133
B007180133
80071 BO 134
BQO71B0133
8007180112
S0071BOH9
BD07180133
BD071B011B
8O07180113
80/07/01
BO/07/01
00/07/07
80/07/03
00/07/02
90-283 Q
30-277 P
30-346 P
30-366 P
30-366 P
B0071B013B
B0071B0140
BOO71BO149
S0071S0160
80071 BO 169
8B0718Q113
8007100133
BQ071B01P3
8007100154
8007100164
80/07/02
00/07/07
00/07/07
BO/ 07/09
00/03/08
30-366 P
30-346 P
30-346 P
90-209 H
COMMISSION
CROSS REFERENCE OF ENCLOSURES TO
PRINCIPAL DOCUMENTS
ACCESSION NUMBER
ACCESSION NUMDEfi
ENCLOSURE
PRINCIPAL
DOCUMENT
DATE
ISSUED
SUBJECT
CATEGCnY
B007180179
B00718O1B7
B0071S0193
B007180199
BOQ71Q020B
B0071B0174
B007180O32
B00713OIB6
80071 BO 1B9
B0071B0196
80/07/03
BO/O6/I9
8O/Oi/S7
BO/07/C2
BO/06/07
HEGGD
SO- 10 G
CONTRACT
50-553 0
5O-213 T
B0071B0212
B0071B0217
B0071BOBBO
B0071B0221
B0071B0227
B007 180032
B0071BOS14
B0071B01B9
BOOT 1 BOS li
8007160224
80/06/19
80/O7/03
BO/07/02
80/05/12
BD/06/Ob
SO- 10 G
HtatD Prog
5O-553 0
COMMISSION
M1SC
B0071B0234
8007 1802 50
30071B0269
fl0071B037'3
8007100376
B0071801B9
B0071B0237
B0071B025S.
B0071B0256
B0071 B026O
BO/O7/OE
B0/06/2b
BO/06/24
BO/06/24
BO/07/li
50-553 0
90-330 H
50-399 &
5O-39S Q
30-446 fl
80071B030<b
B0071B0307
00071B0314
B0071S031*
80071B031B
B0071B03OO
B007IBOS9B
B007IB0301
B0071B030B
B007IBQ312
BO/07/16
BO/07/11
BO/07/14
BO/07/07
BO/07/17
30-243 P
50-243 8
SO-296 S
70-143
30-313 B
80Q71B0322
80071 B0336
S0071B0337
80071B033A
80071B0344
B0071B0317
B0071B0331
B0071B0319
B0071B0333
B0071B0340
BO/07/11
BO/07/10
BO/07/11
30/07/09
BO/07/15
5O-334 S
50-270 S
5O-281 S
50-10 1?
50-S7S A
80071B0395
B0071B040O
B0071B040&
B0071B0413
B0071B041S
B0071B03TO
B0071B039B
3007 1 30393
8007130403
8007180409
BO/07/11
80/07/OB
80/07/07
BO/07/09
80/07/14
50-213 R
5O-271 R
50-393 P
50-345 R
50-319 P
B00718042B
B007 180423
B0071B0437
B0071B0431
B0071B0433
8007180413
B0071S0409
B0071BOO36
B007180O34
B0071B0419
80/07/11
BO/07/14
73/13/09
73/12/05
80/07/10
30-334 R
30-2 1 9 P
COMMISSION
COMMISSION
50-277 R
B0071B044&
80071 304 IB
B0071B04S1
80071B0453
B0071B0454
B0071B0443
B0071B0441
B007IB0445
3007130441
B007IB0441
BO/07/1A
80/07/10
3O/O6/23
80/07/10
30/07/10
50-277 P
5O-144 P
50-31? 0
5O-344 P
30-344 P
B007tB0455
8007tB0461
3007130464
B007IB0467
B0071B047O
B007IB0449
B0071B0457
BDD71B043B
B0071B0462
30071 30460
BO/O6/19
BO/07/07
BO/OB/ 11
80/06/1 1
00/06/11
KPORTL1C
50-237 H
S-0-339 H
MISC
71-9136
80071B047O
B007 180479
BOD71804B3
BOQ71804B&
B0071S04B7
BOO7 130474
80071B0471
B0071S0475
B0071B0471
B0071804B4
BO/05/13
BO/06/ 11
BO/06/2/
80/06/11
BO/07/07
BO-320 H
TOPREP
71-349
TOPREP
50-321 P
B0071B0496
00071B0499
80071B0504
80071 BOS 13
80071 BOS 19
B00718047I
B0071B0490
B0071B0471
B007180508
B0071 BOSOg
80/06/11
80/04/09
BO/O&/I1
BO/Ot/03
BO/06/05
TOPREP
50-443 0
TOPREP
HO-456 Q
50-454 0
80071B03B4
30071B033B
B0071BD361
B0071B0374
B0071B0379
B0071B0521
B007IBQ51B
B0071BOS32
B007180567
3007130194
BO/O6/30
BO/06/12
BO/06/12
80/06/17
BO/O6/30
CONTRACT
BO-344 O
30-410 Cl
30-443 0
COMMISSION
B0071B03BB
B0071B0391
B0071B0596
B0071B039S
S0071BOS99
B007130SS3
B0071B05B8
B0071BOD9n
B0071B059S
B0071BOS93
BO/07/10
BO/07/OB
30/07/01
BO/07/01
30/07/01
50-440 Q
50-440 0
3O-J27 P
30-327 P
30-327 P
B00721004O
8007210047
B00721007&
B0073 10077
B0073100B2
8007210033
8007210046
30072 10O09
8007210063
3007210062
80/07/01
BO/05/15
80/07/01
BO/07/OB
80/07/OB
50-322 Q
30-320 H
SCCY
70-1131
70-1131
BQ07210QS3
B0072100B6
B007210093
8007210107
3007310113
8007210009
B007210062
3007210063
B0072I0099
B007210103
BO/07/01
BO/07/ 03
BO/07/OB
80/06/11
30/06/30
SECY
70-1151
70-1191
30-324 Q
CONTRACT
8007210125
3007310130
8007310131
8007210135
B007310136
B007310116
B00721011B
B007310121
BOO 731 0132
300721012(1
80/06/10
80/07/01
80/07/09
80/06/30
30/07/01
30-4B3 Q
71-17
50-320 H
CONTRACT
BO-341 S
ENCtDHUFlE
PRINCIPAL
DOCUMENT
DATt
IfiSUFO
SUBJECT
CATEQOfll
t
8007310148
B007S10137
BO/04/01
SO-flSS
a
80072)0160
HOC-721O154
BO/O6/30
CONTRACT
90072 IO1 6 9
E007210137
BO/05/29
50-344
Q
3DD7.2IOI70
H007310169
BO/07/01
HO-1192
30075 1OI 7 9
8007310167
B(VOfi/ai
7O-33
B00721OIBG
BOC-7310167
B0/0(b/a4
70-33
80072 1OIB4
8OO721O167
QO/O6/24
70-33
30072 1O1B9
B007310176
90/06/33
&O-322
f\
80072 1O1 90
BOO7aiQia3
BO/06/O9
70-1141
8007510195
B00731Q167
80/06/34
7O-33
8007210 196
B0072101S6
QO/O7/O3
50-263
P
30072 1O20 9
B0072102QO
B0/0i./a7
71-139
80072 1Q209
B0073102OI
QO/06/03
50-410
Q
300721021'!
B0072 10206
30/07/03
SO -332
Q
8007310215
8007310197
00/07/03
30-277
Cl
8007210331
3007210206
30/07/03
30-352
Q
B0072 1 0226
8007310197
90/07/02
30-277
0
B007H 10330
B00721Q2O6
BO/07/03
30-332
a
0007210233
8007210197
ao/07/oa
30-i277
o
3007310333
8007210229
BO/07/17
TOCRCP
3007310335
3007210197
BO/07703
90-277
a
3QQ7B 1 0240
BO 072 103 Ob
00/07^01
SC-33H
Q
800721 021 5
B00721023B
&0/07yiO
30-336
P
80072 1O347
6007210241
BO/06/04
30-317
Q
80072 1 0235
B007H10231
00/06709
30-333
0
80Q7H 10258
8007210233
ao/ofiys*.
CONTRACT
80072 10264
B007210237
OO/OS/27
QA999
B0072 1 OB67
5007210263
BO/01701
CONTRACT
800721 027 B
B007210369
BO/OS7EB
OA999
80072 1 Q2B2
B00731027t,
ffO/067i!7
30-J51
o
B00721Q292
B0072102B1!
BO/077 1 4
30-373
o
B0072 1 0293
B007aiQEB9
BO/06730
70-637
BQQ72 1 0391
B0073102B13
BO/0770P
30-J19
a
B0072 1 0295
B007210HEJ9
Q0/0£>730
70-687
30072 1 029B
BCO72102B7
00/06/30
70-637
B007B 10299
8007310208
flO/0770a
90-219
a
8007810302
8007210297
fiO/07/11
90-350
a
0007210304
000731020'?
eo/oi/30
70-607
80078 1O307
8007310197
eo/07/oa
SO -277
a
6007210309
800731030P
60/06/04
50-3S4
a
80072 1O3 14
800721031 1
BO/06/1?
50-330
p
0007210315
80072 1O3 10
60/O6/B4
70-1257
£0073 103 IB
D0072103I6
BO/06/30
XI'riHTLIC
B007210319
B0072103I1
GO/06/ 13
30-2SO
p
6007210321
6007210312
BO/06/Et
50-332
a
B0072103B3
B0072103I)
BO/06/13
5o-aao
p
B0073 10324
8007210330
77/09/04
70-137
B007S 10325
BOD721032J
BO/O6/O5
50-346
a
B0072 10326
B007310312
B0/Ofi/Ei>
50-353
a
0007210337
B0072103Ba
BO/06/0&
SO -'146
a
B 0072 10330
B0072103ia
BO/Ot/Hi,
M-.3SJ
Q
B 00721 033 S
B0073103I7
BO/06/S4
CONTRACT
B0073 10333
8007210339
BO/07/03
90-316
p
B007S 10333
B007ai03B9
BO/07/02
90-346
p
60072 1Q33B
0007310312
BQ/OA/H&
30-3SS
0
BOQ7S1034O
O007H10329
BO/O//03
30-31A
p
80D7B 10341
30073103^4
B0/0fi/i27
30-387
Q
80O7S10343
80073102Q8
BO/07/00
30-219
0
8007310343
3007310334
BO/O6/27
30-3H7
0
B007210319
0007210334
BO/06/S7
90-U37
(3
B007B10355
8007 rt 1033 4
BO/OA/S7
30-JB7
0
800721036.9
8007210367
79/OB/H9
90-309
R
BOQ72 10371
80073 1 037O
BO/07/14
30-3E1
s
8007310-375
B0072IOD74
BO/07/11
90-J3A
R
B00721Q377
B007H 1 0371i
00/07/14
90-2B6
R
BC-0731Q3BO
D007HI037'/
BO/O7/14
30-306
S
B0073JO3B2
8007210381
BO/O7/19
50-360
n
B007S10397
B00751O393
BO/O7/1 1
30-366
B
8007310400
B007ai039i
BO/07/ 11
50-36B
B
BQ07210404
8007310390
BO/0// 13
3 0-4 "37
A
6007210405
3007310399
79/OQ/B9
SO -29
R
8007310413
6007310-10*
BO/07/ li.
30-Tia
H
8007210431
8007310417
BO/07/1 I
30-269
B
80073101)26
5007310-129
60/07/16
S 0-370
P
6007210430
FJ007310423
BO/06/ 1 .1
•GtN TEC
IS
000721013!
B0073101S8
BO/07/01/
90-309
B
80072! 04 32
O007a 10420
BO/07/ 1&
30-313
Ft
8007210433
aoo7aioia7
BO/07/1 ft
30-62
r
B00721O43B
3007210400
BO/07/OU
30-266
p
B0072J0440
8007510427
77/03/S?
SO-J33
p
506
CROSS REFERENCE OF ENCLOSURES TO
PRINCIPAL DOCUMENTS
ACCESSION NUMDER-
ACCESSION NUMBER
ENCLQSUJ1E
PRINCIPAL
DOCU.MEWT
DATE
ISSUED
SUBJECT
CATEODflV
B007310444
EQ0731043.2
Boo7aio460
0007310165
8007210467
B0072 10437
•8QO7E1O40B
BOQ72)040B
•B00731O4QB
00072 J 01 56
B07O7/19
HD707/OB
QQjmfOa
80/07/09
79/D0/31
SO -28 a S
50-2Afi iP
50-3*6 P
50-266 P
90-371 R
B0072I 04 t>t
BD073I0470
B00731O473
B00721O4B5
BOO 721 04 B6
eOO72104QB
BQ073 10459
B00721O46I
8007310479
80O7310476
BO/O7/OB
80/07/11
ao/07/ii
30/07/13
80/07 /Ifl
50-266 P
30-2A9 B
30-3E7 B
50-445 A
30-413 A
80O7210490
BOO73I047a
80072104*73
B007atO496
6007210300
BOO72HH7B
B0073104B4
BOO721O4B7
8007310473
H00721O'17a
BO/07/1 S
BO/O7/14
90/07/14
3O/O7/13
80/07/15
50-445 A
30-331 B
30-2B9 0
30-443 A
30-413 A
8007210303
BOD7210304
BOO7210307
3007210500
90O7210309
000721 04B7
B00731047B
B007210474
B00721047B
B00731030I
BO/07/14
BO/Q7/ 1 3
BO/ 07/1 4
BO/07V15
BO/O6/24
30-2B9 0
30—145 A
SO-272 B
SO-44S ft
90-263 O
BOQ7310310
BO0721O312
B007S1Q314
B0072I0517
BOQ721QSI9
B00731047B
BG0721O302
00073104 7B
8007210470
S0072I047B
BO/O7/19
80/07/11
8O/O7/1S
00/07/15
BO/07/15
30-443 ft
30-59 R
30-443 A
10-443 ft
30-445 A
BQ073 1 052O
8007210531
8QQ73 10527
BQ07H 10539
90072 1 OS4 1
B0072104S7
BOO72103I6
8007310478
8007210336
6007210537
BO/07/01
DO/06/24
BO/07/1 3
HO/05/29
BO/07/14
50-133 S
50-461 0
30-443 A
Qrt1??1?
30-314 B
B0072 10345
B007210346
80O73 10540
OOD73 10553
80072 1 0556
B007210333
B007310343
900721034B!
8007319342
8007210543
BO/07/12
BO/07/08
BO/06/30
00/06/20
ao/07/oe
50-433 0
50-52B Q
40-B30H
40- H 502
30-323 fl
8007210350
B0072 10563
BO072 10966
B 0072 10569
9007210570
8007210330
B007210343
BOO? 21 OS AD
B00721033O
E3007?10343
BO/07/10
BO/O7/OB
BD/Ob/O4
DO/07/10
BO/07/O8
40-2674
30-32B a
40-B5B4
40-S674
30-328 0
SQ072105S7
8007210617
BOQ72J064O
8007210645
6007210647
3007210563
9007310609
000731 Ofi38
0007210643
BOQ7S 10643
SO/ 07/09
BO/07/11
BO/ 07/01
BO/ 07/10
80/07/10
71-'J79a
30-2B7 S
50-4 O9 P
SO-3O1 0
50-301 0
B007310649
6007220011
8007230023
B007330030
B007220O32
80073 10643
D007B 20009
000722 00 IB
8007220037
S007230QS5
DO/07/10
80/07 /IB
BO/07/O2
BO/O7/01
BO/06/19
30-301 0
70- 1 308
M1SC
50-566 H
WASTE MOT
B007230033
BO 07220036
SO 072200*2
8007320049
B00733D052
B007320031
B007220023
0007B20033
aoo?Haoo25
a0072200DO
BO/07 /OB
QO/Oi/17
eo/oi/i9
80/06/19
90/05/O9
30-2B9 H
HABTE MOT
HASTE: MOT
HASTE MOT
30-217 fl
0007330056
BOQ723006Q
BOO723Q064
BOO7230067
B007220067
0007220025
80072SO030
e00732O033
B0072EO033
B00732O039
HO/06/19
flO/03/07
00/OA/J?
BO/07/ 1O
80/06/27
HABTE MOT
SO-2J9 D
HASTE M8T
71-349
30-J33 fl
B007220070
B007330073
8007220074
BD07230073
8007320077
6007220063
D00722006G
6007220025
B 007320 039
B0072200iB
BO/Od/17
BO/06/ 30
BO/06/19
BO/06/27
DO/Ot/20
40-B72D
10-B771
WASTE MOT
50-'J35 0
40-B77I
3007320077
B0072200B1
B0072200B3
80D73300B7
soo?2200Ba
6007220039
8007330029
BO0722006B
BO 07330 025
H007220059
SO/Oi/S7
BO/06/ 19
BO/06/20
BO/06/19
SO/O6/H7
50-333 0
HASTE MOT
40-0771
WASTE MOT
30-333 Q
8007 230097
8007230100
B0072201O1
B00733010S
S007220103
B0072200H9
B007330073
BOft732DO?5
BO 072200 9 3
9007220072
00/07/BO
BO/03/OS
flO/Ofi/19
80/06/17
60/O7/15
71-7136
30-315 fl
WflSTE MOT
Pft
30-273 S
8007SS010A
0007220111
8007220112
H007B30114
8007220119
8007330099
80Q7aaOD35
3007220095
B007320107
B007 220023
BO/07/50
BO/06/19
BO/03/O5
BO/ 07/03
BO/06/19
71-121
WASTE MOT
30-31 3 Q
XPOHTLIC
WASTE MOT
ENCLOSURE
PRINCIPAL
DOCUMENT
DATE
ISSUED
SUBJECT
CATEGORY
000-7320131
BOO7220110
BO/O7/1B
30-399
0
BOO-7220133
0007220115
90/07/07
71-3971
BOO 7330 133
8007220131
BO/O7/1O
7I-576B
QOO7220142
B007220136
00/07/07
QA979
BOO73HOt45
8007330136
BO/07/07
QA777
BOO 7320 146
8007230140
BO/07/03
30-482
0
BOO 7820 150
B0073201 36
BO/07/07
QA997
80O7220132
B007320 1 43
80/07/10
71-6397
0007320 1S4
B007220140
BO/07/03
30-483
0
BOO 7230 ISO
6007520136
BO/O7/O7
QA999
BOO 7230 163
60072201 SB
80/06/23
30-206
P
B007H3016S
B00722013B
80/06/23
30-206
P
BOD? 220 175
B007220174
80/O7/OB
30-293
a
BOO7S201Bt
0007220174
BO/07/08
30-273
a
9007220 IBS
B007220177
BD/O6/O5
30-313
a
9007220107
B007320174
BO/07/OB
30-293
a
BOO73301B?
0007330 1B3
60/07/07
QA999
8007220191
B007230174
BO/07/OB
30-293
a
BOO73201-76
80073201 82
00/07/07
GIA777
B007S20197
B 007 230 177
BO/06/03
30-313
a
0007220199
80073201 74
BO/07/08
30-293
a
80O7H202O2
8007220 1B2
80/07/O7
QA999
800722020B
B007330I83
BO/07/07
OA999
60O72-20201?
8007230203
BO/07/OB
30-2S9
a
BOO72-202 1 4
D007220207
BO/07/13
FOIA
B007S20ai7
BOO? 230203
80/07/09
30-2B7
0
8007830230
0007220211
BO/06/23
70-138
80072H0224
8007230216
00/06/09
MIBC
60O72 20234
0007220229
QO/06/20
30-303
P
800723024?
8007320311
80/06/23
70-133
B 0072203-10
8007330343
90/07/16
70-143
BOO722023 1
B007 220243
80/07/16
70-143
BOO7S2026S
8007330363
00/07/13
40-379
BO-072S0273
B007230363
00/07/13
40-277
BOQ7E202B5
B007 220278
HO/06/04
30-3 1 7
Q
BOO7220310
0007220303
BO/07/07
40-B304
BO07220315
B007220303
90/07/07
40-0304
B0072S0317
BQ07230314
80/06/30
40-1163
80O7B30334
B007220327
BO/07/09
TOPREP
00O7330337
B007220330
00/06/04
30-73
a
Bf}D732O34b
8007220342
77/08/17
30-237
R
B0072203S3
B007320349
90/07/17
30-70
p
BOO722033-1
B007320352
80/07/13
TOPREP
BOD7S203SS
D007230331
BO/07/13
30-317
R
80O722Q336
8007320349
80/07/17
30-70
p
eoo7aao337
B007230332
80/07/13
TOPREP
0007220339
8007830333
BO/07/13
TOPREP
BOD722O36O
8007220338
BO/07/14
30-327
R
BO0722O361
8007220352
BO/07/13
TDPHEP
BOO 722.0362
B007BS0349
BO/07/17
30-70
P
{1007320364
8007330363
90/07/13
30-219
R
8007320366
B007H20347
BO/07/17
30-70
P
B007HB0369
8007330349
BO/07/ 17
30-70
P
BOO 7320371
B007320367
BO/07/ 13
30-331
R
BOO7K30372
9007220347
80/07/17
30-70
P
8007230377
8007220376
BO/07/14
30-237
P
8007220376
8007330373
BO/07/ 1 7
30-346
S
BOO7 330362
B0072203B1
00/07/11
30-273
3
BQ078203B3
80073203B3
BO/07/17
30-302
P
BOQ7220391
BOQ7320397
80/03/03
30-304
S
8007320393
B007B30390
00/07/18
30-373
F
BOD783O396
0007220374
BO/07/15
30-331
P
3007330407
0007320403
90/07/14
30-344
P
BOO7220421,
B007220419
BO/O7/10
30-330
S
BO07SH0427
8007330424
BO/07/17
30-269
9
80072 EO4H9
8007330426
BO/07/11
30-261
V
80O722O433
Q007220426
80/07/11
30-261
V
8007320434
B007HS0430
80/07/13
30-334
8
B0072 30433
0007220436
80/07/11
30-261
V
6007E2043b
8007330431
80/07/13
30-33B
R
8O07230438
8007330436
BO/07/11
30-261
V
B007820449
B007ES0440
BO/07/16
30-361
B
B007Ba044B
B007E20441
80/07/17
30-3B7
F
8007230433
9007320449
BO/O7/16
30-293
S
B007Sa0437
80072B0453
BO/07/07
30-249
8
B 007220463
0007220443
79/03/13
30-237
R
B007BH0465
B007220459
BO/07/17
30-346
S
8007330467
B007E30457
BO/07/14
30-243
P
BO07220470
B007220464
BO/07/16
50-324
9
SO07B30474
8007330469
BO/07/14
30-337
S
CROSS REFERENCE OF ENCLOSURES TO
PRINCIPAL DOCUMENTS
ACCESSION NUMBER
ACCESSION NUMDER
ENCLOSURE
PRINCIPAL
DOCUMENT
DftTE
ISSUED
SUBJECT
CATEGORY
B007B20479
B007220476
BO/07/13
3O-247
R
00072204B3
B007230477
80/07/11
30-269
P
B00723O4B4
B00733047B
80/O7/16
50-353
S
B0072204QB
B007330483
00/07/17
TOPfJEP
0007220491
B0072204S1
SO/01/31
30-239
R
B007220496
BQ07220492
BO/07/17
TOPHEF
0007220499
3007220492
HO/07/ 1 7
TOPflEP
B007220303
B0072204S2
80/07/17
TOPREP
B007220513
0007220307
80/07/17
30-3 3B
8
0007320313
B007320310
BO/07/14
SO-340
P
B007220319
B0072209I4
BO/07/17
30-331
B
B007220924
8007330333
BO/07/15
30-3
B
BQ0722O326
8007220923
BO/O7/14
50-409
P
B007220S3O
BQQ7330939
BO/07/16
50-239
0
0007220333
8OO722O329
BO/07/1 fa
30-289
0
8007220350
8007330343
79/03/Q1
30-250
R
3007320835
8007220953
BO/O7/11
50-3BO
F
8007930972
BOO7220937
BO/07/14
30-237
8
B007E20373
B007220969
BO/07/17
30-416
A
8007220574
B00722036B
BO/07/1 0
30-337
B
80D7S205BD
0007230375
00/07/16
30-338
S
fiOD78B0302
0007220379
BO/07/33
SO-3-3S
F
B0072203B3
0007220377
00/07/1 fa
30-349
B
0007220393
B007220SB7
BO/07/lt
50-304
S
B007220611
B007320601
90/07/17
5O-339
S
B007H20627
B007220619
BO/07/11
50-273
S
B007230006
B007230002
ao/06/io
50-436
Q
000723000B
0007230009
BO/06/26
50-344
Q
B007230009
B007330005
BO/06/26
50-344
Q
0007230015
0007230014
BO/07/O3
70-IB4
B007S30019
B007230002
SO/06/ 10
50-456
0
0007330021
B00723001B
BO/06/27
50-377
F
B007S3004D
B007230030
SO/07/ 09
71-5979
B0072300t2
8007230036
BO/ 06/30
70-337S
B00723006A
B007230059
BO/06 / 1 7
50-341
Q
000723007B
B007230072
BO/06/ 1 2
30-350
Q
B0072300B7
B007230073
BO/06/ 1 B
50-35B
Q
B007230124
8007230119
BO/06 / t 1
70-371
B007330137
6007230 1 30
BO/06/ IB
50-239
Q
8007230 ISO
80O723O140
BO/O7/O1
30-334
Q
8007230197
B007230140
BO/07/O1
30-334
Q
8007230160
0007230193
BO/07/ O2
QA97?
8007230162
B007230140
BO/07/01
30-334
Q
8007530164
0007230142
BO/06/04
30-2B9
0
B007230 16fl
0007230 143
BO/06/04
30-369
0
B007230174
0007230140
BO/07/01
30-334
0
8007S30195
B00722047I
BO/07/17
30-2B9
F
8007230 19A
0007230 1B2
BO/06/27
30-393
0
8007230202
0007230 182
BO/06/37
30-293
Q
8007330209
B0073301B3
BO/Ot/27
30-293
0
800733022 1
B0072301B3
BO/06/37
30-293
Q
8007330334
B007230224
00/07 /If.
FDIA
8007230296
0007230290
BO/07 /Ifi
FO1A
B007330B97
8007230344
BO/06/SO
30-313
0
800723027B
0007230 26B
80/06/24
30-293
0
B007230273
0007B30266
BO/06/23
30-373
Q
000723037A
0007230 268
BO/06 /E4
30-393
Q
B0072302B 1
0007330273
BO/07/03
30-373
Q
6007230367
B00723O2B3
SO/07/ It
50-306
Q
B00733029 1
B007230202
BO/07/ 16
30-306
a
60O7230292
800723027B
BO/06/ 19
30-49B
Q
8007330273
8007230262
BO/07 /li
30-2O6
a
8007230297
8007230202
BO/07/16
DO- 206
a
8007030303
0007230296
BO/06/ 10
50-331
0
8007230308
0007230301
BO/03/30
3O-2B9
0
8007230317
8007230314
BO/06/IQ
30-303
0
800733038 1
B007230313
BO/07 / 1 3
3O-440
0
8007230324
0007230111
00/07/01
30-243
P
8007330328
B007230314
BO/06/10
3O-3O3
a
8007330333
800723O327
BO/06/19
3O-346
Q
8007230394
BQ07230349
BO/06/24
71-121
B007330333
8007230330
BO/06 /O9
30-234
0
BD07S3036A
8007230361
BO/06 / t 1
30-313
a
8007330375
B007230365
BO/06/ 19
3O-3D4
0
B007230379
8007230371
BO/06/19
3O-10
0
B0072303B3
8007230377
BO/06/12
50-309
a
BOD72303B3
B007330371
BO/06/19
30-10
Q
B007230390
B0072303B9
BO/06/09
30-309
a
8007230412
B007230402
BO/06/17
30-339
a
B007230443
B007330432
00/07/09
30-313
p
ENCLDSURE
PFlinciPAL
DOCUflENT
DATE
ISSUED
SUBJECT
CftTEGDRY
0007230452
3007230445
90/07/15
SO-J39 3
BO 07330 4 62
3007230436
SO/O7/E1
BO-332 A
0007330474
80O7.23Q47O
BO/O7/I3
50-359 S
0007330*79
8D0723D47B
BO/Ofi/U
50-155 F
B0073304B1
flQ072304BO
00^07/10
50-327 P
6007230483
HQ072304BO
D0/'07/ll]
50-327 P
BOQ7230404
B0072304B2
00/07/19
30-331 P
6007230 4Q9
0007 230166
BO/07/17
50-271 S
6007230491
B007 330490
BO/07/ IB
HO-339 S
6007330497
BOO723O493
60/07/17
DO-13B S
B00723O903
90073304911
6Q707/1B
SO- 134 P
B007230314
0007330306
HO/07/ 1U
5O-2B9 0
0007930531
0007330323
8 0/07/1 H
3O-259 S
O00723Q339
SQ07 330334
BO/07/ IB
3O-367 8
8007330532
8007330547
BO/O7/1O
5O-4B2 H
B00733G534
800733054B
8 0/07/1 5
3O-2&7 B
BQ0723OS53
8007330343
BO/07/1S
30-367 S
flQ0733O564
000733054?
60-/07/ 1 5
7O-933
BQ07B3O563
000723035?
00-/07/17
50-330 U
8Q0723Q366
0007330557
a 0/07/03
XPDRTL1C
Q00723O573
0007330562
80/07/16
5O-302 B
BQ0733G574
B007330570
B 0/07/1 7
3O-2I9 B
0007830371
0007330807
80/07/10
5O-390 B
BO 0723060 I
0007330597
8 0/04/25
7O-2000
BQ0723O608
B007 330597
BO/06/25
70-3000
B00723Q61I
B007 330597
BO/06/25
7O-2000
B007S30614
BOO 7 230607
BO/O7/2 1
50-3B9 0
6007230617
BOO 7 2304,09
BO/07/ HI
3O-2B9 0
0007330633
BOO 72306 IB
BO/07/B1?
30-397 0
6007230629
aoo723Q6ia
60/07/09
•3O-397 Q
80O7230630
8007230626
flO/Oii/26
30-320 H
BQ07230632
80073306 IB
flO/07/07
50-397 0
6007330639
30073306 ID
fl 0/07/09
30-397 0
8007330632
S007330635
6O/06/30
30-275 A
a 007230635
8007S30644
flO/07/17
Fl)!rt
8007330663
B007330644
a 0/07/1 7
30-1O D
0007230471
B007B30644
eo/07/1?
50-10 D
800723067B
0007B30A44
a 0/07/1 7
SO-IO D
atJf)7330700
B007230693
a 0/06/1 9
50-373 Q
aoo72po7io
B007B307O4
a o/06/i 9
50-H46 Q
flQ07330721
B007230719
a 0/07/10
40-0432
fl 007330723
B007B30716
HO/07/01
90-377 0
[9007330729
B007230713
SO/O7/ 1 0
40-B43S
8007330730
B007230716
0-0/O7/01
30-H77 0
B007230732
B007S307 1 6
BO/07/Ob
00-277 Cl
B007230734
BOO 72307 1 6
BO/07/01
30-277 0
B007330736
B007B3071A
BO/07/01
B 0-27 7 Q
BOQ7230739
QOO 72307 33
BO/06/ 1H
CDMMISBIDN
BQ072307SJ
aOQ723D74»
QO/06/1B
COMMISSION
B007230738
BOO-7H307S4
60/06/23
30-395- fl
QOO7240002
Q007240001
OO/OV/lfl
TOI'FICP
80O724QOOA
0007B40004
BO/Ofi/13
SO-J39 0
8007840009
B007240004
BO/OA/13
so-iaa o
90072-1001 1
B007H40007
QO/07/01
40-B412
aoovB-tooia
B0072fl0007
BO/07 /Ol
40-B453
B007240013
0007340007
ao/07/oi
10-6452
80072400 IB
0007340013
ao/ob/ob
30-3O1 0
B00724002B
6007B40007
BO/07/01
40-0432
900724 OOHB
80073400-34
BO/07/03
30-346 0
B007240029
BO 07340007
BO/O7/0!
40-0492
8007240034
HO-07340027
(30/06/30
COhMISSKlH
B00724003A
f]O07240030
BO/06/20
XPOPTLIC
90073400-1 1
HO-07340007
BO/07/01
40-Q452
B0072 4004-4
Q007240027
00/06/30
COMrtlSBION
9007240016
aO07B40007
00/07/01
40 -1)452
3007240030
B0072-10037
80/06/30
CDtlMlOBlON
000734.003 &
B007340033
flO/07/16
5o-aia P
800724:0089
BO07S40033
BO/OS/SO
XPOHTUIC
BOQ7K4006I
6007340096
BO/O6/1A
30-313 P
B007240062
(3O0734OOQ3
BO/O7/1A
90-313 P
B00734QQ70
6007340067
ao/O7/l(.
50-J1J P
B007K400B6
6007240079
7B/OO/30
30-230 - R
B00724Q093
800724OOBB
BO/05/2B
30-361 0
B0072. 4.0094
6007240090
BO/06/BO
71-3607
BOQ7S401Oa
0007S4O09B
BO/ 06/26
70-13H9
B007240I07
B00724O104
80/07/02
50-^63 Q
9007240109
B007240100
ao/07/jfr
30-^34 S
6007.240110
B007H40106
ao/07/oi
70-1201
0007240114
B007K4011E
BO/07/15
5-0-^63 H
8007 240 11 <!•
60073401 IS
QO/07/Ba
BO-339 P
SOB
CROSS REFERENCE OF ENCLOSURES TO
PRINCIPAL DOCUMENTS
ACCESSION NUMBER
ACCESSION NUMBER
ENCLOSURE
PfirNCIPAl.
DOCUMENT
DATE
I SSUED
SUBJECT
•CATEGORY
SOD724D123
9007240119
80/07/01
70-27
fl 0072 4 01 23
80D724O124
8O/O7/1S
3O-366 B
SDO724O129
BCQ7H40127
80/07/13
90-3 I
H 007240131
9007240130
60/07/S1
5O-2B3 S
B007340135
BCO7240132
80/07/01
NUJJEG
8007240137
H007240133
80/07/O1
NUFiEG
3007240142
800724D131
80/O7/1I
5O-3B7 K
6007240143
9007240131
BO/-O7/JI
30-387 K
3007240190
8007240149
80/07/17
5O-313 S
3007240153
GOO 72401 52
BO/07/ 13
5O-31S S
B007340196
B007240119
BO/07/23
BO -339 P
B0072401S9
B00724O149
BO/07/22
BO-339 P
BOO7240161
B007240149
BO/07/23
SO--339 P
BOO72401&6
BOO724O149
00/07/22
SO-339 P
B007240167
B0072401A5
BO/07/17
90-366 S
BOO724O17O
B0072401AB
flO/06/09
CONTRACT
B007240172
BOD7240169
flO/07/17
BO -247 B
BOO724O173
BOD724O16B
BO/06/0-?
COMTfiAC T
B007240177
0007240174.
BO/07/05
90-23O R
9OO724O179
BOO724O175
SO/07/ 1 5
71-3B3
9007310188
B0072401B3
ao/o7/ia
FOIA
SOD724O193
B0072401B6
flO/07/ 1 5
71-139
8007240196
B0072401B9
80/07/03
5O-324 Q
9007240207
B007 240201
BO/07/ 1 &
71-6394
9007240210
0007240163
BO/O&/06
30-282 Q
9007240315
B007 240200
BO/07/15
71-9044
8007240217
B007240212
BO/O7/J*
71-9132
8007240231
B007240223
BO/O7/I9
30-239 P
0007240234
80073402Z5
BO/O7/15
30-239 P
80O7240240
SOD7 240236
BO/O6/1O
BO-33B Q
B007240342
8007240238
BO/ 07/1 9
50-377 P
BOO7240247
B0072402E4
BO/0&X23
XPflRTLIC
B007240349
B00724O23B
BO/ 07/1 5
90-377 P
BO0724O2S1
G00724D23B
BO/07/ 13
50-377 P
B00724O233
BOO724O236
GO/0&/1D
30-39B (1
B00724025B
B00724O245
BO/ 07/1 6
•10-4337
B007240359
B007240255
8O/07/14
30-298 P
B0072402&3
B00724O26 1
BO/07/11
50-23D 0
B007H402.64
B0072402&2
SO/07/)]
50-331 d
BD0724026&
0007340261
BO/O7/11
50-250 tl
B007240272
800724026 1
ao/ 07/ii
30-230 a
BOO724O273
B007240267
BO/06/27
30-S06 Q
S007240276
B00724O261
ao/07/ii
30-250 0
S007E40a77
B007240292
80/07/11
30-321 0
H 00724 0279
B00724O265-
8O/O7/OB
30-51B 0
fl 00724 O2E31
B00724026 1
BO/O7/U
30-290 a
3007240285
B007 240292
BO/O7/11
30-321 0
SOO724O29O
B007 240285
BO/Oii/30
70-1738
3007240292
B007S40252
00/07/11
90-331 Q
8007240293
BDD724D269
BO/07/OB
50-31B 0
8007340290
fl007ff40291
BO/07/17
30-249 fl
8QO7240302
8007340397
80/07/10
30-327 P
8007240305
3007340265
80/07/OB
50-S1B 0
BOO7240306
8007240297
80/07/IQ
30-327 P
80O7B4&3I2
8007240297
ao/07/io
90-327 P
BOO7240313
8007340307
ao/07/io
90-346 a
60O7240314
000734030'?
aO/0(j/B6
90-344 a
BOO7240326
8Q07S-4D31B
80/06/20
90-206 4
GOO7240329
8007240B69
80/07/00
50-918 «
8007240331
B007?4D322
80/0-6/11
70-1237
SDO7240337
B007 240333
80/06/03
90-493 0
80O7240348
B.007 240238
79/0-9/Ofl
70-106H
3007240351
0007240340
BO/O7/lfi
90-456 0
800724 03tB
B007B-40337
BO/O7/03
50-369 0
3007240376
B007240369
BO/06/10
30-348 0
8007340377
90072403b7
BO/07/03
30-369 0
800724-037B
8007240371
QO/07/09
50-Hfl9 H
8007240309
8007240383
80/07/02
70-2 1&3
B007240395
8007240383
ao/o6/ia
50-S75 O
BOD7240113
B007S40404
80/O7/09
SO-SB9 H
B 0072-10 4 2O
B007S40407
BO/04/ 1 B
50-313- 0
B007240433
8007240427
BO/07/13
&0-333 P
BDR7340441
90072401127
HO/07/13
50-323 P
SO 07240 4 57
8007240450
aO/07/09
71-291
BO 07240 4 68
8007240444
80/07/15
SO-339 H
BOO7240479
B007240474
BO/07/21
roiA
BOD72404B1
9007E404BO
BO/07/10
COMMISSION
BO 072404 83
80072 4 04BD
BO/07/10
COMMISSION
BO 07240 4 S7
80072 4 04BO
BO/07/10
COMMISSION
B007240491
90072 104BO
BO/07/10
COMMISSION
ENCLOSURE
PRINCIPAL
DOCUMENT
DATE
ISSUED
SUBJECT
CATEGORY
B007240493
B00724O4BO
BO/07/10
COMMISSION
BQ07240496
S00724O4BO
BO/07/10
COMMISSION
B007240497
0007240400
80/07/10
COMMISSION
£3007350010
0007230007
80/07/02
COMMISSION
BOO72S001B
B00723Q006
80/06/24
40-4337
8007290019
B007290014
80/07/11
10CFR
BOO723002B
0007290023
SO/03/HO
COMMISSION
8007330033
0007230032
80/07/OB
3O-10 P
80O7250091}
0007290022
80/07/53
FDIA
B0072SOO37
B007230092
80/06/10
QA999
BOO72 3003B
B0072S0032
80/07/22
FOIA
BOO72S0061
BQ07S30022
80/07/22
FOIA
80072 SOOA7
B007230062
80/07/13
30-320 H
80O72300B2
0Q07230079
80/07/09
COMMISSION
8007330003
BO07230079
80/07/09
COMMISSION
00072 3OOB9
BO0723Q079
80/07/09
COMMISSION
BO0723O09B
80078300 32
00/06/10
QA999
B007B 30096
80072 3OOB8
BO/07/10
3O-3BB 0
BOQ72S009B
800729QQ79
BO/07/09
COMMISSION
B0072.SO100
B007&50032
00/06/10
a/1999
80O72901OJ
B007230079
BO/07/09
COMMISSION
BQ072SOI03
B007230079
80/O7/09
COMMISSION
B007B30t09
BD07250032
80/06/10
OA999
BD072BGU4
BO072S0079
80/07/07
COMMISSION
BO0723Q115
80072301 10
80/06/11
71-3937
B00723G117
BO07290111
80/07/07
COMMISSION
80072301 IB
B007330079
80/07/09
COMMISSION
60-07350 137
BO07250079
80/07/09
COMMISSION
B00723Q174
BO07330167
80/07/10
90-320 H
BO072301SO
BOQ7290176
BO/06/04
SECY
BOD723O1B9
8007390134
BO/03/14
OA999
BOO723021S
8007230202
80/07/03
COMMISSION
8Q072SO24A
8007230223
BO/ 07/02
90-946 U
BOO72502SB
8007350241
SO/07/OB
30-330 0
3007230263
8007230241
BO/07/OB
90-220 0
B007S30363
8007290241
90/07/08
90-220 a
B0072S02M
B0072SO291
BO/07/07
50-317 H
8007230270
B00723O267
00/06/16
30-293 0
80072502B4
B007230277
BO/07/02
30-273 H
800723O3O3
B00729Q300
BO/07/13
30-243 P
B0072S0317
8007230313
BO/07/ 03
30-286 0
80O72S0324
8007390319
80/07/21
30-334 B
0007230323
800729Q313
80/07/O3
30-286 0
0007230329
9007230313
80/07/03
30-206 0
B00723033O
000729Q326
BO/O7/22
90-302 P
B007BS0331
B00729O315
80/07/21
90-334 B
BOQ7S50332
00O723O313
BO/07/03
90-806 Q
B0072SO341
B00723O334
80/07/17
90-324 B
0007230348
BOO72SO343
80/07/22
90-312 P
B0072BO3B3
00O72SO3B3
BO/07/E4
30-330 F
B007350393
00O723O391
80/07/11
30-397 A
BOD723D376
BOO723O391
BO/07/11
30-397 A
BQ0729O39B
0007HSO391
80/07/11
30-397 A
B007250400
0007230391
BO/07/11
30-397 A
B0072SO4O2
BOO723O391
80/07/11
90-397 A
BOO 72504 O3
BOO72SO391
80/07/11
30-397 A
0007230409
BOO723O404
00/07/16
30-309 P
3007250410
B00723O407
BO/07/18
3O-336 B
0007290412
BOO7S3O41t
BO/07/ t7
3O-366 B
B00723041&
B007250414
BO/07/22
3O-327 B
0007230423
B007230421
BO/07/1 B
90-298 R
B007290433
8007290428
80/07/23
3O-344 0
B007Z3D437
8007230420
80/07/B3
30-344 0
BOD7230438
8007230434
80/O7/22
30-346 P
80072 5O4 4 4
80O7H90440
80/06/04
PROJ
S00723O452
8007290446
80/07/21
30-B89 0
8007230453
800729O44B
BO/ 07/1 a
30-373 A
BOO723O4Bt
BOO789O474
BO/07/2E
30-344 P
8007330483
B007230476
80/07/21
TQPREP
80O723O494
Q00789O406
BO/06/17
70-820
B0072SO499
0007230436
BO/07/19
30-327 S
0007250B02
000729O4B3
00/07/24
30-393 M
0007250320
0007230510
BO/07/21
90-416 B
00073303 SB
9007230944
00/07/22
90-460 A
B007230B63
B00723O936
BO/06/09
CONTRACT
8007330970
BOO7290969
00/07/02
CONTRACT
0007330397
B00723O9B2
BO/06/26
OA999
0007530998
B0072S03BO
BO/07/ 1 1
70-29
0007330389
B0072S0982
80/06/26
QA999
BOO72SO392
B007B90B8S
BO/06/26
QA999
CROSS REFERENCE OF ENCLOSURES TO
PRINCIPAL DOCUMENTS
509
ACCESSION NUMBER
ACCESSION NUMBER
ENCLOSURE
PRINCIPAL
DOCUMENT
DATE
ISSUED
SUBJECT
CATEGORY
8007230594
6007950603
80072 00607
8007250621
8007230649
3007890383
BOO723059B
S00725059B
800725061 1
80O725O633
80/06/26
BO/06/3O
BO/06/30
BO/05/29
BO/07/07
QA999
50-369 Q
90-369 Q
COMMISSION
30-482 M
0007830047
B0072BOOBO
B0072BOOB4
BQ0728009B
8007280113
BOO728OO59
80072S007 1
8OO72B0079
B0072BOOB5
8007280107
BO/06/30
BO/06/17
BO/O6/23
BO/04/S9
BO/06/21
Pf)
30-333 0
ono
QA999
90-244 P
8007280116
0007280129
BO 07280133
B007380136
B0072B0137
8007380106
B0072B0126
B0073B0137
B0073BQ129
B0072B0132
BO/07/ IB
BO/07/09
BO/07/83
BO/06/23
80/0&/23
50-330 H
SO-321 0
50-302 P
50-320 H
30-49H Q
B007S80MO
B0072B0147
B0078BOHB
8007230133
8007280135
B0072B0130
B0072B0141
BOO72BO144
8007280)44
BOQ72BOI31
80/O7/OB
80/07/07
BO/06/20
BO/06 /BO
SO/O6/3O
30-289 0
50-367 R
30-333 Q
30-383 Q
71-3979
80072B0160
B0072B0163
8007280170
8007280173
B007aa0177
BQ072B0151
B0072B0191
B0072B0162
B0072B0151
B0078B015I
BO/0&/30
80/06/30
QO/06/19
80/06/30
BO/06/30
71-5979
71-3979
COMMISSION
71-5979
71-3979
B0073B0184
6007280187
B0072B01BS
BOO72B0193
8007860302
B0072B0179
BQ072BQ179
B0072B01BE
B0072B01B2
B0072B0197
80/06/06
BO/06/06
80/07/07
60/07/07
80/07/21
70-143
70-143
50-320 H
SO-320 H
FOIA
B0078B0209
B007280209
B0078BQ813
B0078B0229
B0072B0226
8007280 IBS
8007280197
B007280197
8007280220
8007280228
BO/07/09
80/07/21
BO/07/21
BO/06/03
BO/07/81
30-10 D
FOIA
FOIA
70-87
30-3 6B P
80072B0236
80072B0246
BQ072B0249
B007280251
3007280252
B007380334
8007280242
B007BBQ339
800733022?
B0072B024B
BO/07/09
80/06/16
BO/ 07/11
BO/07/11
80/07/11
CPNTHACT
30-3 S4 0
50-333 P
30-333 P
50-293 0
B0078B0839
B007BB0236
B0072BQ85B
8007800262
80072B0279
B0072B0229
8007280248
800728024B
800728024B
8007280272
80/07/11
BO/O7/11
BO/07/11
BO/07/11
BO/07/ 16
30-333 P
30-293 0
SO-293 Q
50-293 0
FOIA
8007280327
80072B0366
80072B03B2
B0072B03BB
8007260390
B0072803HO
BQ072B036Q
8007880376
B0072803B4
B0072B0384
BO/06/19
80/07/07
ao/07/ai
BO/07/22
BO/07/88
70-1319
XPDRTLK
50-206 B
30-278 P
50-270 P
8007280396
80072B0400
80072B0403
80072B0404
B00728040B
B0072B0371
B0072B0393
B007SB0397
B0072B0391
B0078B0401
BO/07/16
80/07/22
BO/07/07
80/07/16
BO/06/17
30-206 8
30-339 P
XPDRTLIC
50-206 B
30-H93 Q
BOQ728Q416
BO07880421
B0072B0429
B0078BQ430
B0072B0433
B0073B0416
B0078B0416
B0072B0416
B0072B0427
8007280429
BO/O7/09
80/07/09
80/07/09
BO/07 /2B
BO/07/17
30-270 Q
30-270 0
30-H70 0
30-270 P
30-346 0
B0072B043B
8007200443
BQ072B0446
B007280449
B007BB04S3
8007880437
B0072B0442
B0078B0443
B007BB044S
B0072B0451
BO/07 / 1 8
BO/07/16
BO/07/22
80/07/17
BO/07/1S
90-269 P
30-272 P
30-321 S
30-321 8
30-317 8
80078B049S
B007HB0497
BOQ78B0463
8007880467
B0072B0468
B0072B0430
B0078B04B4
80072B046I
B0072B0452
B0072B0460
8OY07/03
BO/06/23
8CVQ7/24
80/07/16
8O/07/09
90-366 8
30-37 Q
30-2B6 I
30-29S P
30-299 Q
BQ072BQ474
B0072B0475
B007SBQ478
B0078B04B4
B0078B04B7
8007280470
B0072B0460
B0072S0460
B0072B0460
B0072B0479
BO/07/01
BO/07/09
8O/ 07/09
BO/07 /09
8O/07/I3
30-363 P
90-2 S9 Q
30-259 Q
50-239 Q
90-394 A
B0072B0499
BQ072B0511
B0072B091B
B007B80S13
BOQ78B0324
8007280479
80072B0804
B007EB0303
B007BB0907
8007280313
80/07/13
BO/07 /IB
BO/07/14
BO/07 /8I
BO/07/22
50-394 A
50-313 S
50-366 9
30-400 R
50-333 S
ENCLOSURE
PRINCIPAL
DOCUMENT
DATil
1S&UED
SUBJECT
CATEGDHV
B 0072303 2 6
0007280587
BOO7 23033 i,
B0072B0543
B00728053 1
80072B0918
B0072BO520
80072B0523
8QO72OO532
80O72BO531
80/07/17
BO/O7/OJ
BO/07/02
BO/07/11
BO/07/22
50-36h S
CDNTfiACT
50-33? H
71-6670
SQ-230 P
B0072BOS53
BOO72B0356
80073B0565
80072BO973
a0072BOS7B
B0072B0515
B0073B053I
eDO72B036l
6007380363
6aO72Btn71
BO/07/16
BO/Q7/22
BO/07/11
BO/07/16
BO/O7/22
30-344 S
50-250 P
71-9O30
50-3114 B
9O-346 B
B007H80580
BOO72B05B2
B0073B05QB
B0072BO3B9
B0072BO'590
8007230573
•B0070e057'l
3007280573
8007380583
•3007280539
30/07/11
QO/O7/16
QO/ 0-7/23
00/-07/23
SO/O7/3T
71-9049
S0-i!43 P
3O-321 S
^0-J4fa S
bO-52B K
B007SB0572
B0072B059>3
B0073B059B
B0072B0402
B0072B0606
G 007280594
BQt)73fl0579
BOO72a05Q3
B007380596
60072803=39
ao/&7/oa
BO/O7/03
aO/-0-7/33
BO/07/31
BO/07/25
50-J9B S
30-'J2O G
UO-bSB K
SO-346 B
TQPHEP
80072B06 1 1
8007 2 BOA 1 7
80073806 1 B
8007360,622
B007200A32
BDD7280604
B0072B0610
0007280607
B007ano60?
B0072BOfa24
BO/07/24
BO/07/33
BO/07/24
BO/07/23
BO/ 07/2 3
50-309 R
SO -3 33 S
30-260 S
50-346 S
5O-T 1 1 S
8007280636
8007280639
BO 072804 1O
BOQ7280ii42
B007280643
8007^50627
aOO72B0633
a0072B0629
B0073HO&34
B0072U0630
BO/07/3B
BO/07/2-1
20/07/33
QO/ 0-7/1 7
BO/07/33
90-449 M
90-244 S
DO-331 S
50-331 P
HO-34ti $
B0072B0452
S0072B0695
B0072B0639
60072B06S.9
8007200673
BO072B0643
B0073 80646
BO072QD&96
8007280662
QQD72O0656
BO/07/ 16
BO/O6/3O
BO/07/17
SO/O7/22
90/07/17
30-267 Q
50-36B S
5D-409 0
50-J33 S
50 4O9 O
80072BOi74
8007S6067fi
8007260677
8 007280680
B 0072804.84
80072B0665
BOO72B0664
8007SB0656
8007280478
8007?30i56
SO/O7/31
80/07/18
H&/07/17
OOV07/10
BO/O7/17
30-303 a
S0-:il7 3
30-109 0
50-321 f?
30-409 0
D0072B06B3
QO-0731106B6
QQ072B06BB
BO-07280690
BC-07380671
ano7?ao679
aO073BOSi7B
an073306BI
B007U806B2
BD072H0656
BO-/07/EE
BO/07 /!O
BO/07/17
BO/Q7/E2
BO/07/17
30-103 3
SO-321 It
30-373 0
50-321 3
10-1*09 Q
B007300692
BOO?aB&696
8007260703
8007BB0717
8007260720
B0072H0670
BOO72H065(.
Q0072BO&9a
00072(30713
8007200713
BO/O7/1O
80/O7/17
BO/O7/14
OO/Oh/C?
BO/07/21
50-331 R
5O-409 0
71-9053
CONTRACT
7 1 -47H6
fl 00728 0725
B0072D072B
B007SB07S9
B007HB0730
if 0072 Q 0737
B007aB07E2
B0072Q0724
B007Sf30723
B0072Q07?4
B0072B0733
80/06/12
60/06/17
CO/O6/13
•BO/06/17
BO/07/0-9
niMttlSiaiDN
so-in2 a
COMMIE'S ION
30-403 Q
70-1 1OO
G0072B0713
B0078B074A
B007EB07&6
90072B0773
QO072OO779
80072130733
80072G0733
8007C80763
0007300771
HO072D07/fa
BO/07/09
BO/O7/01?
80/07/31
HO/O7/33
ao/07 /an
70-1 !<H>
70-1100
71-9QBO
71-V1T?
71-63H7
8007270003
8007290009
B00729001 1
BD0729QD12
8007890017
BO-07290001
B007290003
B00729000Q
BO 0-7290003
BO D7SVOO 13
BO/07/1 1
BO/06/17
BO/O7/21
B0/0(,/17
BO/07/0'7
70-J 100
UELV
71-A36H
flECV
50-482 0
B007S900J8
B0072900E9
B00739003S
900729003B
8007290042
8007390016
BO072900EB
00072900-31
H007290034
BOO/2TO031?
80/0 1 fid
BO/O/./OJ
BO/07/ U.
BO/07/ai
BO/O7/14
71-TO10
3CCY
50-2O7 II
90-4B3 A
PRO-J
8007290045
3007370090
B0072900S1
BOO? 29003 6
B007E900A5-
B007290D41
B007390041
aOO7E90047
a&072')0053
3007390060
GO/O//1J,
BO/O7/H,
BO/O6/17
BO/0//I7
80/07/16
State Prog
Btota ['roa
SO-32O H
M111C
atale Prog
B007K70067
B0072900B3
B007290I99
8007390237
S00729O24 4
B007290064
8007290072
B00729017A
B007390S31
8007E90331
nO/06/SB
BO/0// Hi
BO/ 05/30
90/06/HO
BO/Ofi/EO-
90-330 H
70-113
90-244 0
40 -fl 102
40-H10a
510
CROSS REFERENCE OF ENCLOSURi
PRINCIPAL DOCUMENTS
ACCESSION NUMBER
ACCESSION NUMBER
ENCLOSUHE
PRINCIPAL
DOCUMENT
DATE
J56UED
SUBJECT
CATEGORY
B007290353
300725023(1
80/06/27
50-313 II
B00729O334
0007290345
QO/O7/03
3O-4B2 S
B0072903B2
B007290277
80/03/01
71-6717
B007S902S7
0007290375
00/06/34
30-327 0
8007390296
BOQ729Q279
00/06/24
50-327 0
fl 007290321
B007H90307
BO/06/06
OA999
SOO729G337
8007290327
30/O6/05
OA999
8007390359
B007290347
80/06/12
CDHHIS3ION
600729O361
CQ07290344
00/06/16
50-43B Q
600739O360
B00729033B
BO/07/21
QA999
B00729O37Q
B00739033B
BO/07/31
QA999
eoa729O3BO
E 007290369
BO/06/ 1 9
50-315 Q
6007390392
60Q7S9033B
SO/07/21
QA999
BOO7290-393
BO 07290305
80/06/20
3D-364 Q
8007290401
B00739O393
BO/06/EO
30-359 Q
6007290404
3007290100
BO/06/17
30-390 Q
Q00729O410
a0072?04Q6
BO/06/20
27-47
S007290414
B0072901O9
BO/O6/16
30-424 Q
8007290433
Q0072901S2
BO/06/23
30-966 Q
8007290439
B007270433
ao/07/oo
30-TO2 a
6007390452
8007390446
BO/07/03
XF-DRTL1C
BQO7290467
B00739'0460
SO/07/11
XPORTLIC
B 007290 4 70
B007290463
CO/O6/1B
PKOJ
8007290475
0007290460
60/07/33
30- 128 R
0007290477
B007290474
80/06/06
OW99
0007290481
0007390474
BO-/06/06
QA999
BHJ07290-1D7
8007390+71
BO/06/06
OA999
BOQ729Q493
B007S 90474
00/06/06
OA999
0007290497
0007290474
00/06/06
QA999
0007290304
00072 9 M 74
B0/06/0f>
QA999
8007390600
B007290386
80/07/32
30-330 S
8O07270iI4
QD07290& 1 4
00707/33
BO-259 8
B007290637
8007290626
80/07/24
SO-39S F
B007290639
3007290636
BO/07/2S
50 -337 B
0007290640
0007300633
BO/-07/24
30-307 B
0007390656
3007290649
80/07/33
30-337 S
B007 290639
8Q07290646
00/07/1 B
30-327 9
8007290664
3007390^97
BO/07/ 10
30-259 0
8007390672
BD07290669
BO/07/ 02
80-337 B
8007290673
9007390663
00/07/29
30-337 0
0007S9067/
B007290669
00/07/24
50-303 S
0007390681
B007290679
BO/07 /2»
BO-327 B
BOO? S 90607
Q00729067B
80/07 /O7
30-434 K
8007290693
0007290605
(30/07/24
30-3S7 8
8007290702
3007890693
QO/07/S4
30-296 B
0007290707
B007B90701
00/07/33
30-329 fi
0007290710
6007290699
BO/07/10
30-372 R
B007E9071I
0007390604
80/07/83
30-3J 1 B
8007290715
B00729070B
00/07/23
50-327 S
8007290726
B007H90720
BO/07/3,3
30-260 8
0007290739
0007290710
(TO/07/23
30-272 S
B007290744
6007390737
(10/07/23
30-239 a
8007E90770
BOO 7 390762
00/07/33
30-337 B
B007290777
B007H 90774
BO/07/33
30-434 F
3007&907BS
80072?077I
00/07/09
one
8007370000
00073W790
GO/07/ 1Q
9OOB7 3
B007890S03
00073 907B1
60/07/83
PRO
B007290D05
B007S 90799
BO-/ 07/31
30-889 H
B007290BO?
B007370701
BO/ 07/85
ana
Q007390B 1 7
t!007290ai 1
00/07/1B
30-320 B
S007290B10
8007390010
00/07/23
50-327 B
8007290037
B0072'90B23
BO/ 07/21
5o~na7 0
0007290839
0007290020
BO/07/lfl
30-296 B
6007290030
B007S90024
BO/07/35
&o-a?o B
B007290B31
BQ07290P23
BO/07/23
90-3E5 B
B007a90B32
0007390029
00/0-7/33
30-310 F
000729093^
B007290B26
BO/07/33
ao-nas B
B007S9DB39
B007270B23
BO/07/33
30-&14 F
BC07290B43
Q007a90D3fl
00/07/23
•JO-J3EI B
BO-07290B44
aa07E70837
80/07/33
3Q-?73 3
BOO7290833
8007290546
80/06/19
5Q--J3B 0
B007390B62
9aD7S90STli
GO/06/11
QWr
0007290071
3007290369
BO/07-/21
90-391 Q
B007290073
9007390869
00/07/31
3O-K34 Q
0007290070
BOQ729DB74
80/07/10
30-3 Oi P
B007 270931
B007S909E9
00/07/11
71-36B
0007370931
600739093B
00/07/H
71-37O
000730Q007
000730000B
BO/07/ IO
afio
0007300013
80B7300010
00/07/14
SO- MO H
80073000-10
6007300030
00/07/11
3O-34 0
ENCLOSURE
PII1N< I PAL
DOCUMENT
DATE
ISSUED
flUDJECI
CM toon v
800730004B
0007300046
BO/06/13
40-074S
H0073O0031
B007300046
BO/06/13
40-0745
60073000SQ
0007300046
80/06/13
40-B71S
8007300063
B007300046
80/06/13
B0073O0074
BOO/300068
80/03/06
CUWtlfhOIOM
B0073O0091
S0073000B2
80/07/16
70-113
a 007300103
B007JOOOS3
BO/07/ 16
70-141
0007300127
800730012,2
BO/07/36
30-JOV Q
8007300136
8007300133
BO/06/83
BQ07300143
0007300139
8O/06/33
30-1M q
6007300157
0007300131
BO/06/34
30-10 t q
B007300164
8007300 16O
BO/06/24
3Q-1D> q
B007300169
B007300160
BO/06/34
30-101 q
B0073O0178
8007300173
BO/07/17
OAV9?
B0073001B2
B007300173
BO/07/17
(1A79V
B 0073 00 100
8007300173
00/07/17
OAVJ9
B007300192
8007300173
BO/07/17
0*999
B0073O0194
8007300173
80/07/17
0007300198
B007300173
BO/07/17
QA99V
6007300203
8007300379
BO/06/ IB
lo-a-j*
BO073 00209
B007300H8B
BO/06/30
40 -391
8007300291
S0073002B4
BO/07/3 t
90-as1) p
S0073fl0293
0007300293
BO/07/00
30 :M* o
B0073Q03D4
0007300300
80/06/26
B007300309
0007300307
00/06/23
30 -till Q
0007300314
8007300310
BO/06/04
GA99V
B007300313
8007300308
80/07/31
OAVY9
BO073O0310
B007300313
80/07/03
30 :n,\ Q
BO07300321
B00730O317
80/06/13
an :m o
B007300323
B007300320
80/07/23
90-313 Q
8007300330
8007300326
BO/06/13
wt'i\v a
8007300331
8007300324
BO/07/14
90-^1 a P
B007300333
BOO73O0329
BO/07/33
no -ji:t Q
B007300338
0007300334
80/07/14
90-IFKI P
B007300342
8007300334
80/07/14
30-3] II P
B007300343
0007300339
80/07/09
30-206 0
8Q0730Q353
0007300349
BO/06/1S
30-3 IS a
B00730O354
0007300349
BO/06/13
90-315 -d
B00730O376
8007300374
80/07/83
90-35; n
B007300377
8007300372
80/07/03
90- 9 W fl
8007300300
B007300383
00/07/84
90-33-4 (I
8007300390
0007300301
00/07/20
90"j)6ft Q
9007300393
B007300391
BO/07/00
30-3fl3 4
B007300490
B0073004B1
BO/07/23
90 'D 1 4 0
80073O0494
B0073004B1
80/07/83
90-3*4 0
aO0730049B
B0073004BS
BO/07/16
90-33; a
8007300300
0007300481
80/07/83
90-3*4 0
800730O306
00073004B1
80/07/33
BO .HI a
8Q073QQ308
B007DOD4B3
BO/07/16
90-93; 9
80 073 DO BOB
B0073004B3
00/07/16
SO-H:I? a
0007300313
B007300392
BO/07/84
5Q-:iai ti
Q00730O314
B007300311
00/07/29
3Q-4BU ft
Q0073OO317
8007300311
80/07/29
ao- ma A
B00730Q320
B007300511
80/07/89
30-ioa A
0007300331
B00730031 1
80/07/29
W-WJ A
BO07300332
800730031 1
00/07/39
90-4IW A
8007300334
8007300S1 1
BO/07/39
90 "4DJ A
B0073DO325
800730051B
BO/07/09
30-nn (i
6007300336
BOD7300311
00/07/29
50 -403 A
B00730D32B
B007300311
00/07/89
90 4119 A
B007300329
8007300311
00/07/29
90-ioa *
B007300S33
B007300S11
80/07/89
so- ma *
B00730O334
8007300311
BO/07/27
90-ttltf A
B00730O333
80073003 1 1
00/07/39
90 "i (lit A
B 0073 00336
800730031 1
BO/07/E9
90-*aa A
B0073DOS30
BOO/300511
80/07/39
90-4B9 A
0O0730Q339
800730011 1
BO/07/29
9D'4-Q3 A
BO0730OB40
8007300311
00/07/29
B0-4BJ A
BO0730034J
B007300311
80/07/29
30 "402 A
B007300343
B00730O3I1
80/07/29
90-402 A
8007300346
B0073003I1
80/07/29
90-10H A
B00730O347
Q00730031 1
BO/07/2?
90 40V A
B00730O349
800730031 1
BO/07/39
90-40? A
B0073O0331
B00730031 1
80/07/39
90'4B!I A
B0073QOBS4
B007300311
BO/07/39
9a-4U2 A
B0073O0336
B007300311
80/07/29
JO-W A
BO 07300339
0007300311
00/07/29
90 1U2 A
8007300360
B007300337
80/04/16
40-0?J?
0007300362
800730031 1
BO/07/29
90 40? A
0007300364
800730031 1
BO/07/S9
90-4lt» *
CROSS REFERENCE OF ENCLOSURES TO
PRINCIPAL DOCUMENTS
511
ACCESSION NUMBER
ACCESSION NUMBER
ENCLOSURE
PRINCIPAL
DOCUMENT
DATE
1BBUED
SUBJECT
CATGQDRV
BOQ730OS66
BOO730O311
BO/07 /29
30-4B2
A
aoo73oosta
BOO 730 OS 11
BO/07 /a^
30-4B3
A
BQO730O37O
BOO730O511
EO/07/B9
30-402
A
BOQ7300380
BOO7300376
EO/O6/23
30-321
H
BOO7300581
SOO7300379
BQ/G7/11
CONTRACT
9007300535
80073O0574
BO/Oi/37
50-254
0
80Q73QOSB7
BOO73OO5B4
QO/07/03
50-390
A
0007300870
BOQ73OQ577
BO/07/10
CONTRACT
80O73Q0394
B0073OO589
80/OA/17
50-S1B
0
BOO7300B9B
B0073QO393
BO/06/27
CONTRACT
BOO73Q0604
9007300601
3O/06./23
30-346
0
BOO7300604.
80O73O0601
ao/ofc/as
SO -346
a
BOQ7310O10
80O731O006
SO/07 /Ol
CONTRACT
BOO7310D19
BOO731O013
QO/O7/11
71-173
BOO7310O23
8QO73 1 0022
BO/O7/IO
30-10
H
BOQ7310Q35
8007310052
8O/O6/36
SO-37K
a
BOQ7310Q63
BO 073 10061
BO/06/26
50-277
a
BOQ731QO73
BOQ73 10069
BO/O7/01
XPDHTLIC
BOQ731011B
BO07310104
ao/07/oa
30-272
0
BOO7310124
BOO731O104
8O/07/OB
50-H7B
0
BOO7310131
BQQ731Q1Q4
BO/O7/OB
50-272
a
BOQ7310I6B
BOO731O163
BO/O6/26
so-aee
a
BOO7310176
BOO73 10174
BO/0-6/10
OA999
BOO7310171?
BOO73 10174
BO/O6/10
art999
BOQ731Q1B2
BOO73 10174
BO/O6/10
0/1999
BOO 73101 SB
B007310174
80/O6/10
«A999
80O731Q189
B007310174
BO/O6/10
flA-599
8007310199
B007310174
BO/06/10
OA.999
8007310230
B0073-1O31B
BO/O7/H1
BO-3Q9
Q
8007310282
0007310215
SO/07/J7
BO-331
P
BOO731Q2H3
BO073102I3
ao/ 07/21
30-399
0
BOO 731 0226
BO0731OS19
8O/07/17
30-331
P
BOO73 1023B
BO0731QS1Z
BO/07/2I
90-3B9
a
B0073102B9
B0073102I5
BO/ 07/1 7
50-331
p
BOO 731 0233
8OO731Oaia
BO/07/31
50-3B7
a
BOO 7310243
8007310240
BO/ 06/23
30-416
a
BOO7310247
BOO7310B32
BO/07/24
FOtA
BQQ731023Q
B0073 10232
BO/O7/24
FOIA
BOO73 10260
BOQ7310B32
BO/07/24
FO!A
80O731O3&9
B00731029B
BO/O7/24
F01A
Boo73ioa&6
B007310232
BO/07/24
FBI A
BOO731 0=4.7
BOO731O241
BO/ 07/11
30-303
Q
BOO731OB69
BQO731O3SB
BO/ 07/24
FQIA
BOO731Q270
BOO731OS32
BO/07/H4
FDIA
BOO73102B4
8DO731O27Q
BO/07/E5
30-313
a
B0073102B6
QOO7310aBt
BO/O7/I1
SO-092
B
BOO731O2B7
8007310373
BO/ 07/1 4
SO-3H1
a
BQO731Q293
BOO73102B9
BO/O7/I1
50-394
B
BOO73 10301
BOO7310S94
BO/07/OB
50-313
Q
BOO731D303
0007310297
BO/ 07/11
30-4B2
B
ENCLOSURE
PRINCIPAL
DOCUMENT
DATE
ISSUED
SUBJECT
CATCQCIRY
B00731O31O
S0073103Bb
BO/O7/B5
50-32O
P
BQ0731031A
300731O304
8O/O6/3O
90-266
a
B00731O325
S00731032J
80/07/2 9
90-127
P
BO 0731 0327
Q0073 10321
SO/O7/10
90-273
a
B00731O339
3007310335
BO/06/30
90-39S
a
BO 073 10341
S007310340
BO/07/S1
5O-2S9
F
B00731033I
B00731O344
BO/O6/23
90-339
a
60073 103&5
0007310361
BO/O6/19
3O-a43
a
S0073 10366
BOO7310363
BO/Ofi/23
30-461
Q
80073 103&7
B007310363
BO/O6/23
30-461
s
80073IO374
BOO731O33O
BO/07/2-J
30-164
Q
B007T1Q3B1
Q007310379
BO/O7/23
50-269
p
S0073103B3
OOO7310379
GO/O7/25
5O-369
p
BOD73103B7
3007311036-6
ao/oay 19
30-329
A
B007310405
{3007310403
SO/O7y I 1
5O-136
R
B007310417
8007310414
8O/O7VOB
30-277
R
C007310410
8007310410
BO/O7,' 1 7
BO-3I3
B
BOO731042O
3007310414
ao/Q7./on
50-277
R
BOO73104S5
B007310422
80/07^23
50-199
J
fl 0073 10430
3007310426
BO/O7^ H9
5O-2B6
B
BOO731O437
3007310433
80/O7/31
SO-J44
S
S0073 10443
8007310434
BO/Q7/24
5O-40?
I
30073 1D44S
0007310441
BO/O7/O7
PR
a 0073 10469
8007310467
00^07^20
50-330
a
80073 104B3
SOQ73EO4B1
80 / 07 J 32
70-247B
80O73104B6
HOD-73I04BO
BO/O7/10
30-349
Q
B0073 10490
BOO73104B9
BO/O7yiB
XPDRILIC
B00731049B
BOO73104B3
BO/O7/24
FOIA
B007310495
BOO7310491
BO/O7/I6
S 0-270
a
8007310496
BOO73 1048k
BO/O7/a2
70-247B
90073 1Q50Q
0007310497
SO/O7/15
HASTE M01
r
BOO7310S01
B00731O491
80/O7/16
50-270
a
9007310303
B0073104B1
80/O7/23
FOIft
B0073 10504
8007310499
80/o&/ia
30-247
a
80073 10506
B007310481
QO/O7/33
FOIft
B007310310
BO 0731 OB<07
30/06/37
50-293
0
00073 1 OS IS
B007310307
BO/O6/a7
50-293
Q
BDO7310316
BOO731O3O3
BO/O7/M
50-320
Q
8007310336
8007310536
BO/O7/24
SO-2GJ}
H
000731032"?
8OO73I0321
DO/07/33
30-3E9
a
B007310533
BOO7310530
BO/O7/3H
50-3/3
Q
QOO7310S39
B007310532
OO/O7/3-1
90-139
H
B007310336
B00731O&31
BO/O7/3H
10-J4(.
0
B007310349-
B007310544
BO/O7/3E
FQIfl
APPENDIX A
DEFINITIONS OF DOCKET 50 CATEGORIES
A. APPLICATION/CONSTRUCTION STAGE DOCUMENTS AND CORRESPONDENCE
This category follows the application from submission to the day preceding the issuance of an oper-
ating license. It includes all correspondence and documents with substantive technical content that
do not fall into other specific categories. Included are:
1. Application for construction permit.
2. General Information submitted with construction permit application.
3. Amendments and changes to items 1 and 2.
4. NRC questions, requests for additional information, and applicant responses.
5. Correspondence and documents relating to unresolved design and construction issues,
6. Meeting announcements and summaries of meeting discussions on issues of item 5.
7. Correspondence regarding the Preliminary Safety Analysis Report (PSAR).
8. Information on laws and changes in regulations or policy that affect the status of the appli-
cation (NEPA, Water Quality Improvement Act, Water Pollution Control Act, etc.).
9. Construction Permit, amendments, and correspondence relating to the construction permit.
10. Scheduling of license application submission or review.
11. Environmental review information.
12. Application for operating license.
13. General Information submitted with operating license application.
14. Amendments and changes to items 12 and 13.
15. Correspondence regarding the Final Safety Analysis Repoit (FSAR).
16. Correspondence and documentation on generic technical matters highlighted by an event at
another facility which may affect the subject facility; not covered by an IE Bulletin.
17. Reports of site visits.
18. Backup technical documents (e.g., topical reports) submitted in support of the application.
B. UTILITY PRELIMINARY SAFETY ANALYSIS REPORT (PSAR) AND AMENDMENTS
This category is strictly limited to the items listed below. All related correspondence is filed in
Category A.
1. Preliminary Safety Analysis Report (PSAR) submitted by utility (formerly called Hazards
Summary Report or Safety Analysis Report).
2. Amendments and changes to the PSAR.
513
3. Transmitta! and acknowledgement letters.
4, Certificates of service to the PSAR,
C. UTILITY ENVIRONMENTAL REPORT (ER), AMENDMENTS AND CORRESPONDENCE
This category is strictly limited to the items listed below. Other environmental documents and
coirespondence are filed in Categoues A, D, M, P or R.
1. Environmental Report (ER) submitted by the utility.
2. Amendments and supplements to the ER.
3. Tiansmittal and acknowledgement letters.
4. Information on scheduling of submittal or review of ER.
5. NRC questions, requests for additional information, and applicant responses.
6. Federal register notices citing the availability of items I and 2,
7. Correspondence relating to the review of ER.
8. Meeting announcements or reports of meetings where the primary subject of discussion is the
ER.
D. NRC DRAFT AND FINAL ENVIRONMENTAL (IMPACT) STATEMENTS (DES AND FES),
SUPPLEMENTS AND CORRESPONDENCE
Tlus category is strictly limited to the items listed below. Other enviionmental documents and
correspondence arc in categoiies A, C, M, P or R.
1. Draft and Final Environmental (Impact) Statements (DES and FES) prepaied by the NRC.
2. Supplements to the DES and FES.
3. Correspondence relating to the DES and FES.
4. Comments from other federal, state and local government agencies.
5. Traiismittal and acknowledgement letters.
6. Documents related to NRC review of environmental issues or of ER obtained for purposes of
writing the environmental statements.
7. Backup technical documents submitted in connection with above,
8. Federal register notice citing availability of items t and 2.
9. Site visits to obtain information for DES or FES.
10. Meeting announcements or reports of meetings where the primary subject of discussion is the
DES or FES.
E. NRC SAFETY EVALUATION REPORT (SER), SUPPLEMENTS AND CORRESPONDENCE
This category is strictly limited to the items listed below. Other documents dealing with safety
related issues are filed in categories A, P or W, depending on the phase of the licensing process.
514
1. Safety Evaluation Repoit (SER) prepared by the NRC (formerly called NRC-AEC Hazard
Analysis Report).
2. Supplements to SER.
3. Correspondence relating to SER.
4. Fedeial register notices citing availability of items 1 and 2.
5. Information on scheduling of SER submittals and review.
6. Requests for additional information for use in preparing SER; responses to such requests.
7. Meeting announcements or reports of meetings where the primary subject of discussion is the
SER.
8. Transnnttal and acknowledgement letters.
F. SECURITY, MEDICAL, EMERGENCY AND FIRE PROTECTION PLANS
All plans in this category are individual submissions. Information submitted as part of the PSAR
or FSAR is excluded.
1. Fire Hazard Protection Plan and surveys.
2. Plant evacuation correspondence.
3. Safeguards Contingency Plans.
4. Review of Health Physics Progiam.
5. Correspondence relating to aforementioned plans.
6. Supplements, changes and revisions to plans.
G. LEGAL AND ADJUDICATORY CORRESPONDENCE
This category contains all non-antitrust Legal and adjudicatory documentation, except for transcripts,
briefings and testimony > which are filed in category T.
1. Atomic Safety and Licensing Boaid (ASLB) and Atomic Safety and Licensing Appeal Board
(ASLAB) hearing related documents.
2. Federal icgister notices regarding hearings.
3. Requests to make appearances at hearings,
4. Motions, briefs, arguments, statements and related correspondence filed by participants for
hearings.
5. Transmittal of supporting documents (e.g,, SER, FES) to the boards.
6. Correspondence to and from intervenors.
7. Board orders and decisions.
8. Petitions for Commission action.
9. Legal filings and Commission orders and decisions resulting from item 8.
515
H. GENERAL CORRESPONDENCE
This category includes documents with little or no bearing on the status of the application or license.
Items that have no substantive technical content or meaning for the status of the license or applica-
tion are included.
1. Change of address notifications,
2. Changes in structure of organization.
3. Changes in service lists
4. NRC requests to applicant for additional copies of documents.
5. Correspondence from the public requesting information about the facility and NRC icsponses.
6. Correspondence on strictly administrative matters.
7. Letters of support, concern or opposition to the facility.
8. Correspondence regarding the Local Public Document Rooms (LPDRs).
9. Professional qualification statements not pertaining to the hearing process.
I. FINANCIAL INFORMATION
This category contains all financial information except that submitted as part of the application or
its amendments or relating to the imposition of civil penalties.
1. Company annual reports.
2. Separately submitted financial information and related correspondence.
J. INSURANCE AND INDEMNITY INFORMATION
1. Indemnity agreements and amendments.
2. Endorsements insurance policies.
3. Other correspondence regarding indemnity and insurance matters.
K. UTILITY FINAL SAFETY ANALYSIS REPORT (FSAR) AND AMENDMENTS
This category is strictly limited to the items listed below. All related correspondence falls in category
A or P.
1. Final Safety Analysis Report (FSAR) (formerly called Final Hazards Summary Report).
2. Amendments and changes to the FSAR,
3. Federal register notices citing availability of items 1 and 2.
4. Transmlttal and acknowledgement letters.
5. Certificates of service to die FSAR.
516
L. LIMITED WORK AUTHORIZATION (LVVA) AND RELATED CORRESPONDENCE
This category is limited to documents pertaining to Limited Work Authorizations (LWA) whereby
applicants can carry out limited site preparation and construction prior to the granting of a con-
struction permit.
1 Limited Work Authorizations (LWA) and amendments.
2, Correspondence pertaining to work performed under LWA's.
M. ANTITRUST REVIEW AND ANTITRUST CORRESPONDENCE
1. Document submitted as part of the applications for a construction permit and operating license
entitled "Information Requested by the Attorney General for Antitrust Review".
2. Correspondence where the primary topic of discussion is antitrust matters,
3. All antitrust proceeding related documents except for hearing transcripts, teslimony and brief-
ings, which are filed in category N.
N, ANTITRUST HEARING TRANSCRIPTS, TESTIMONY AND BRIEFINGS
This category contains word-for-word transcripts of hearings, testimony and briefings in antitrust
matters. Related correspondence falls in category M.
0. ADVISORY COMMITTEE ON REACTOR SAFEGUARDS (ACRS) REPORTS AND
CORRESPONDENCE
1. Correspondence and letter reports relating to Advisory Committee on Reactor Safeguards
(ACRS) reviews.
2. Correspondence from ACRS.
3. Announcement of ACRS meetings.
4. Transmittal and acknowledgement letters.
5. ACRS reports.
6. Statements and written testimony by ACRS members or presented by individuals at ACRS
proceedings.
7. Minutes at ACRS Subcommittee Meetings,
P OPERATING LICENSE STAGE DOCUMENTS AND CORRESPONDENCE
This file assumes the position of the Application/Construction Stage (category A) file for general
technical items dated from the issuance of the operating license to the application for termination
of the license.
1, Operating license, amendments, proposed amendments, changes and related correspondence.
2. Technical specifications and changes.
517
3. Backup technical documents (e.g., topical reports) submitted in support of items 1 and 2.
4. Federal register notices citing availability of items 1 and 2.
5. Correspondence regaiding the Final Safety Analysis Report (FSAR).
6 All genera! technical correspondence, meeting announcements or meeting sumnianes relating
Co technical specifications, the operating license or technical issues arising after Ihc issuance
of the operating license.
7. Correspondence regarding codes (eg., ASME), regulations, laws or changes in policy that may
affect plant opeiation or bear on the operating license
8. Information on the Standard Review Plan (SIP).
9. Results of surveys or tests conducted in accordance with [he technical specifications (not
periodic reports, which fall in category R).
10. Correspondence relating to NRC's Systematic Evaluation Program (SEP).
1 1 Owner's group meeting announcements and reports.
12. Quality assurance information.
13. Environmental matters (technical).
14. Emergency core cooling system documents.
15. Radioactive waste information.
16. Correspondence regarding expansion of spent fuel stoiage pool.
17. Start-up test reports.
IS. Correspondence and documentation on generic technical matters highlighted by an event at
another facility which may affect the subject facility; not covered by an IE Bulletin.
19. Reports of site visits.
Q. INSPECTION REPORTS; IE BULLETINS, CIRCULARS AND INFORMATION NOTICES-
CIVIL PENALTIES AND RELATED CORRESPONDENCE
1. Inspection reports.
2. IE Bulletins (formerly called Regulatory Operations (RO) Bulletins), Ciiculars and Information
Notices.
3. Responses by applicant to IE correspondence.
4. Applicant's determination of proprietary nature of inspection reports.
5. Letters concerning areas of noncompliance.
6. Pre-service and in-service inspections and procedures.
7. Correspondence and orders relating to imposition and payment of civil penalties, including
Notification of Significant Enforcement Actions (EN's).
8. Any correspondence relating to inspection and enforcements that does not specifically relate
to incidents or events as defined in category S. y
518
R. PERIODIC OPERATING REPORTS AND RELATED CORRESPONDENCE
This category includes periodic reports of a routine nature,
1. Monthly, semiannual, or annual operating reports (other than financial).
2. Periodic environmental monitoring, effluent testing, or similar reports.
3. Peiiodic peisonnel exposure reports.
4. Operational Logbooks:
Logbooks on Environmental Data
Logbooks on Radiological Data
Operations Log on Plant Systems Core
Plant Status Summary Sheets.
5. Correspondence or other documents relating to the above listed items.
S. REPORTABLE OCCURRENCES, PNO'S, PNS'S AND RELATED CORRESPONDENCE
This category contains all materials relating to abnormal, unusual, reportable or nonroutine occur-
rences or events. This includes:
1. All 24-hour, 10-day, 30-day, interim and final Licensee Event Reports (LER's) and follow-up
correspondence (also called incident reports, abnormal occurrence reports and reportable
occurrences).
2. Potential or possible reportable deficiency reports and related correspondence.
3. Personnel exposure reports.
4. Construction deficiency reports submitted under 10 CFR 50.55e.
5. Preliminary Notification of Occurrence (PNO's) and Preliminary Notification of Safeguards
Events (PN's).
6. Environmental Technical Specifications violation reports and Environmental Event reports.
7. Part 21 Reports of defects and noncompliance.
8. Correspondence or other documents relating to items 1-7.
T. TRANSCRIPTS, TESTIMONY AND BRIEFINGS ON NON-ANTITRUST MATTERS
This category contains all word-for-word transcripts, except for antitrust matters (category N),
testimony and briefings, and congressional matters (category U).
1. Atomic Safety and Licensing Board (ASLB) and Atomic Safety and Licensing Appeal Board
(ASLAB) transcripts.
2. Testimony and statements submitted to ASLB and ASLAB.
3. Commission meeting transcripts.
4. NRC staff briefings to the Commission.
5. Statements and written testimony submitted at Commission meeting or hearings.
6. Transcripts of utility briefs to NRC staff.
7. Advisory Committee on Reactor Safeguards (ACRS) meeting transcripts.
519
8. Corrections to above items.
U. CONGRESSIONAL/EXECUTIVE CORRESPONDENCE
This category contains correspondence on substantive matters. Routine responses to constituent
inquiries are filed in category H.
1. Statements and testimony before Congress or before bodies/committees appointed by the
Executive or Legislative Branches.
2. Preparatory and backup documents for item 1.
3. Correspondence to and from NRC Office of Congressional Affairs, Congress and the Executive
Branch on other than constituent response matters.
V. LICENSING OPERATORS AND RELATED CORRESPONDENCE
1. Operator licenses or administrative information bearing on licensing of operators.
2. NRC examination results.
3. Power plant examination summary sheet,
W. DECOMMISSIONING STAGE DOCUMENTS AND CORRESPONDENCE
This file assumes the position of the Operating License Stage (category P) file for general technical
items from the application for termination of the operating license onward.
1. Application for authority to voluntarily surrender license.
2. Application to dismantle the facility and dispose of component parts.
3. Technical documents submitted in support of items 1 and 2, such as: Decommissioning Plan,
Dismantling Plan, Environmental Report on Dismantling, Safety Analysis Repoit on Decom-
missioning.
4. Documents relating to disposal of radioactive material and decontamination of the site.
5. Other correspondence relating to above items.
6. All documentation relating to the ongoing operation of the plan, formerly filed in category P.
520
APPENDIX U
DEFINITIONS OF NONDOCKETED CATEGORIES
10CFR — Commission Meeting Records
This categoiy contains documentation pertaining to open and closed Commission meetings. It
includes:
1. Sunshine Act Fedeial Register notices.
2. Full, wntten explanation of closed meetings.
3. Certification of General Counsel on closed meetings.
4. Commission Determination Statements regarding the public disclosure of transcripts of
Commission meetings,
5. Verbatim unofficial and official transcripts or portions of transcripts of open and closed
Commission meetings made publicly available in accordance with provisions of 10CFR Part 9,
the Sunshine Act, and Commission policies.
6. Enclosures to released transcripts, including applicable viewgraphs, staff papers, and staff
conespondence.
7. Staff requirements memoranda for open meetings; memoranda to record; record of votes of
Commissioners on items under consideration at meetings.
ACRS — Advisory Committee on Reactor Safeguards
This category contains documentation pertaining to the responsibilities of the Advisory Committee
on Reactor Safeguards. ACRS serves as an independent advisory committee to the Commission in
safety-related areas. The committee provides advice with respect to the hazards of new or exist-
ing nuclear facilities and the adequacy of related safety standards. The documents in this category
are:
1. Verbatim transcripts of ACRS subcommittee and full committee meetings relating to facility
license applications and safety-related matters.
2. ACRS meeting announcements; description of meeting agendas,
3. ACRS-generated reports, memoranda and correspondence that are publicly available.
4. ACRS consultant reports, comments and related correspondence.
5. ACRS and NRG technical correspondence pertaining to safety matters under review by the
Advisory Committee on Reactor Safeguards.
COMMISSION - NRC Commissioners
This category contains documentation pertaining to the daily conduct of Commission business in
the Office of the Commissioners, including:
1. Incoming and outgoing correspondence to and from the Commissioners relating to official
NRC business, including reports and other enclosures.
521
2. Travel voucheis, telephone logs and official appointment calendais of individual Commissioner
3. Weekly Information Reports (SECY series numbei) piepaied by the Executive Diiecloi foi^
Operations (EDO) lor the Commissioners, piovidmg a summaiy of key events and items ot
interest undertaken by individual staff and program offices.
NOTE- For transcripts of Commission meetings, see 10CFR category. Foi ail othei staff papeii.
with a SECY series designation prepared foi Commission icview, see SECY catcgoiy,
CONTRACT - NRC Contracts and Modifications
This category contains documentation peitaining to AEC and NRC contracts and Inteiagcncy
Agreements, including:
1. Notifications of issuance of request for proposal (RFP) and invitations foi bid (IFB).
2. Solicitations (RFP or IFB) issued by the NRC.
3. Notifications of contract execution, specifying contract number, project title, contiactoi
name, contract type, funding, and period of perfoimance.
4. Contractual documents and contract modifications, if any.
DISCLOSURE — Financial Disclosure Information
This category contains financial disclosure information in accordance with the Ethics in Government
Act of 1978.
FOIA - Freedom of Information Act Requests and Releases
This category contains requests for agency records and records released in accordance with the
orovisions of the Freedom of Information Act (FOIA). Documents in this category include:
1. Requests made by any member of the public (assigned an identifying number YY-NNN
for last two digits of the year— numerical sequence) for NRC records made in accordance
with the provisions of the Freedom of Information Act.
2. Coriespondence between the NRC and the requester relevant to the processing, appeal,
denial or granting of an FOIA request.
3. Records or portions of recoids released in response to specific requests made undei FOIA.
GEN TECH IS - Generic Technical Issues
Tlus category contains records pertaining to unresolved safety issues of a generic nature that are
being analyzed by the Division of Nuclear Reactor Regulation.
1. Draft reports of action plans to accomplish generic tasks in the regulatory program.
2. Correspondence with industry and internal correspondence regarding the methodologies,
analyses, and programmatic and technical aspects of issues.
522
3. Meeting notifications and minutes.
4. Interim findings and status leports on generic tasks addressing related aspects of generic
technical issues.
I&E — Inspection and Enforcement
This categoiy contains bulletins, circulais and information notices that are issued by the Office of
Inspection and Enforcement. These issuances describe particular events that occur at a facility
that may lequiie some follow-up action on the part of licensees. Also included in this category
are preliminary notifications of events (PNOs).
1. I&E Circulars, which describe an event at a licensed facility and are informational in nature.
2. I&E Information Notices, which are similar to circulars but are preliminary in nature and
issued shortly after an event has occurred.
3. I&E Bulletins, which describe an event at a licensed facility and request all recipients to
perform certain actions as a result of this event.
4. Preliminary Notifications of Events (PNOs), winch provide updated information of an event
of safety or public interest significance.
NOTE: For letters forwarding the above issuances, utility responses to such issuances, and
related correspondence, see Category Q of individual docket categories,
MISC — Public Document Room Miscellaneous
This category contains documents that do not fall into the scope of the other non docketed
categories,
NUREG - NUREG Reports and Related Correspondence
These documents are formal reports issued by the U.S. Nuclear Regulatory Commission which
carry the NUREG series code and correspondence pertaining to those reports, NUREG reports
are accounts of woik performed either by the NRC staff or by NRC contractor.
1. These reports are normally final work products and are characterized by the following criteria:
a. They are predecisional documents which present information to be considered in
Commission licensing and policy decisions.
b. They present the results of Commission licensing and policy decisions.
c. They present the results of technical research conducted for the Commission.
2. Correspondence from industry, government and interested members of the public commenting
on reports or requesting clarification or interpretation.
3. Internal NRC memoranda summarizing meetings or discussions pertaining to the content of
the reports.
523
ORG — Correspondence with Other Organizations
This category contains correspondence with professional organizations and associations, records
other than Regulatory Guides that pertain to the activities of NRC's Office of Standards. Develop-
ment; and emergency petitions not assigned Petition for Rulemaking (PRM) numbers that request
the Commission (o take immediate action on some issue. Included are-
1 Meeting summaries and technical correspondence between NRC aad professional associations
and international bodies, such as the Atomic Industrial Forum and the International Atomic
Energy Agency.
2. Correspondence between NRC's Office of Standards Development and other government
agencies m which both parties have joint regulatory responsibility; e.g., EPA has authority
to control all radioactive pollutants emitted into the air.
3. Internal memoranda, correspondence between NRC and Congress, and other technical cor-
respondence dealing with the role and activities of the Office of Standards Development.
4. Statements, motions, orders and correspondence dealing with emergency petitions filed by
parties on such topics as fire protection and re-analysis of the capacity of operating U.S.
plants to withstand earthquakes,
NOTE: For Regulatory Guides and comments to Regulatory Guides issued by the NRC Office
of Standards Development, see the REGGD category.
For petitions for rule makings filed by the public to amend, rescind or change an NRC
regulation, see the PRM category.
PR - Proposed Rule
This category contains records dealing with NRC staff proposals to adopt, amend or repeal a
Commission regulation. Proposed Rules (PRs) are normally the result of a Commission deter-
mination that sufficient grounds exist for it to proceed with a petition for change in an NRC
regulation (PRM) filed by an outside party or person. The documents in this category are:
1, Federal Register notices stating the terms or substance of the proposed rule or a specification
of 'the subject and issues involved,
2. Text of the Proposed Rule (PR).
3,, Comments, statements, information, opinions or arguments on the proposed change to a part
of the Code of Federal Regulations, Title 10.
4. Requests from the nucleai industry, organizations and other parties for written interpretations
of the PR.
PRM - Petition for Rulemaking
This category contains records dealing with petitions filed with the Commission by an outside
party to issue, amend or rescind an NRC regulation. Included are:
1, Petitions filed by any interested person or party to issue, amend or rescind an NRC
regulation.
2. Federal Register cause notices of the filing of the petition.
524
3. Correspondence between NRC and the petitioner regarding the status and substance of the
petition.
4. Comments from the nuclear industry, professional associations, public interest groups and
others in favor of or in opposition to the PRM.
NOTE For staff recommendations to the Commissioners on whether the PRM should be denied
or issued as a Proposed Rule, see the SECY category.
For Commission review of staff recommendations, see the 10CFR category.
PROJ - Projects-Predocket Licensing
This category contains records pertaining to two classes of projects; (1) commercial nuclear power
plants for which NRC has full licensing responsibilities; and (2) government-owned reactors for which
NRC provides technical expertise and occasional review, Both classes are identified with a "P"
prefix, followed by a series of numbers.
1. "Pre-docketed" commercial nuclear power plants
Tliis categoiy contains all documentation up until the time that the NRC considers the appli-
cation and the Preliminary Safety Analysis Report (PSAR) is submitted by the utility for staff
review. The unit is then assigned a docket number, and transferred to the Docket 50 category,
These documents arc grouped together in categories, designated by alphabetic characters, These are
the same categories as those used for the Docket 50 series.
A. Application/Construction Stage
1. Application submitted by the utility.
2. Meeting notices, summaries and correspondence discussing the completeness and
adequacy of the PSAR.
3. Applicant's Quality Assurance Manual.
4. Early site review information.
5. Backup technical documents submitted in support of the application.
6. Early site visits.
B. Utility PSAR and Amendments
1. PSARs submitted by the utility,
2. Amendments and changes to the PSAR.
3. Transmittal letters,
4. Letters acknowledging receipt of the PSAR.
G. Adjudicatory Correspondence
1. Motions, briefs, orders, et al pertaining to pre-hearing conferences, if any.
M. Antitrust Correspondence
1. Submittals and related material pertaining to the .antitrust review.
525
Q. Inspection Reports
1, Inspection reports of the applicant's quality assurance program.
2, Notices of deviations.
3, Follow-up correspondence resolving deviations cited.
2. Government-owned reactors
Meeting summaries and technical correspondence between NRC and other government technical per-
sonnel related to test reactors, critical experiments, and DOD reactors on navy ships and other
sites.
PT21 — Noncompliance Reports and Related Correspondence
Deficiency reports are performed in compliance with Part 21 of Title 10 of the Code of Federal
Regulations and include:
1. Reports by firms involved in the nuclear industry concerning noncompliance with NRC regu-
lations or the existence of defects which could create a substantial safety hazard.
2. Correspondence pertaining to the NRC review of reports to assess the possibility of generic
defects.
3. NRC inspection reports of defects cited.
4. Correspondence specifying appropriate follow-up actions taken by the Agency.
QA999 - Quality Assurance Inspections
This category contains inspection reports of vendors' quality assurance programs and follow-up
correspondence. Each vendor facility is assigned a docket number and is part of the QA999 series.
Vendors are defined here as companies, both U.S. and foreign, that are engaged in the design or the
manufacture of nuclear components for plants licensed by NRC. QA comprises all those planned
and systematic actions necessary to provide adequate confidence that a structure, system or com-
ponent being manufactured will perform satisfactorily once it is put in service, The controlling
criteria are 10 CFR Part 50, Appendix B, vendor QA topical reports, and the PSAR and FSAR
submitted by utilities for specific facilities. Documents in this category include;
1. NRC inspection reports^ conducted on a quarterly or semi-annual basis, of vendor sites. Inspec-
tions may cover the design, fabrication, construction and testing of structural systems and
components.
2. Notices of deviations.
3. Vendor corrective actions and other follow-up correspondence associated with the resolution
of inspection findings.
REGGD - Regulatory Guides
This category contains new and revised regulatory guides issued by the Commission and related cor-
respondence. These guides describe for the industry and the public methods acceptable to the NRC
526
staff for implementing specific parts of the NRC's regulations, They also delineate techniques used
by the staff in evaluating specific problems or postulated accidents, or provide guidance to appli-
cants, Included are.
1. Federal Register notices announcing the issuance and availability of a proposed regulatory
guide.
2. Revised or newly issued Regulatory Guides.
3. NRC value/impact assessment and industry codes, when applicable, that pertain to the issuance
of a specific Regulatory Guide.
4. Comments submitted by the nuclear industry and interested members of the public regarding
a proposed Regulatory Guide.
5. Summaiy of meetings held in the NRC to discuss pioposed Regulatory Guides.
NOTE. For documentation pertaining to other work products and activities of the NRC Office
of Standards Development, see the Organization category.
RES - Research and Technical Assistance Reports
This category contains reports, generally of an interim nature, submitted by NRC contractors pro-
viding research and technical assistance to the Commission. It also includes documentation per-
taining to research activities of the Commission. Included are:
1. Project desciiptlon documents.
2. Letter reports of accomplishments and data reports; for example,
a. model documentation reports
b. code documentation reports
c. code verification reports
3. Pre-test prediction reports.
4. "Quick look" reports,
5. Informal experimental data reports and post-irradiation examination analyses.
6. Conceptual design desciiptions.
7. Letter reports of foreign travel and site visits by contractors.
8. Letter, monthly, quarterly, interim or annual status or progress reports on other research
projects contracted for by the NRC.
9. Meeting summaries and correspondence dealing with technical matters relating to research
and technical assistance contracts.
10. Staff Research Information Letters (RILs) transmitting the documented results from com-
pleted research programs.
NOTE: For final reports of research conducted by contractors, see also NURBG reports.
REVIEW GRP - NRC Research Review Groups
Tliis category contains records pertaining to the activities of NRC Research Review Groups. Swell
groups provide a broad base of technical expertise to aid management in reviewing research in
527
defined technical areas. They review and comment on research plans and predicted results of
major experiments, the validity and applicability of research results, the possible redirection of research
projects, new research projects, and priorities within the technical areas covered by the research
review group. Documents in this category are:
1 . Agendas for quarterly review group meetings.
2. Summary minutes of review group meetings representing views expressed, including dissenting
views .
3. Research plans and predicted results of major experiments; presentations by research contractors.
4. Comments on meetings from attendees, including representatives from contractors, universities,
vendors and other agencies.
5. Internal memoranda relating to topics under discussion.
RM - Rulemakings
This category contains records pertaining to public hearings held on proposed changes (PRs) to the
Commission's regulations. Hearings are instituted at the discretion of the Commission based on
the importance and the magnitude of the subject under consideration. Documents in this category
include.
J. Designations of the presiding officer and any special directions for the conduct of the hearing,
2. Notifications of hearing board meetings,
3. Petitions, motions, testimony and statements submitted by parties to the hearings.
4. Hearing board orders and rulings.
5. Technical reports submitted as evidence in the proceeding.
6. Reports, if any, of the special board to the Commission regarding a rulemakmg proceeding.
SECY - Position Papers Before the Commission
This category consists of staff papers prepared for the information or approval of the Commis-
sioners wliich are assigned a SECY report series code. Included are:
1. Commission Action papers, which normally include alternatives and recommendations by the
staff on a given issue and require Commission action.
2. Consent Calendar items and Policy Session items.
NOTE: For Weekly Information Reports prepared by EDO to the Commissioners providing a
summary of key events and items of interest undertaken by staff and program offices,
see the NRC Commissioners category.
STATE PROG - State Programs
This category contains records that pertain to the Commission's activities and interaction with State
governments. Areas covered include: (1) the State Agreements Program, whereby States may assume
certain of the NRC's regulatory authority over nuclear materials; (2) the Agency's role in assisting
528
State and local governments in planning responses to radiological emergencies; and (3) a wide range
of liaison and cooperative activities regarding such functions as licensing and siting. It includes;
1 . Correspondence between and among NRC Office of State Programs and State officials,
mostly State liaison officers, regarding;
a. cooperative programs in such technical areas as radiation control, emergency response
planning to radiological incidents, water quality and transportation surveillance,
b. technical assistance to Agreement States in reviewing applications, compliance actions,
developing regulations, and other areas.
2. Agendas, repoits and transcripts of regional workshops and training programs on current
matters of policy and regulations; i.e. decommissioning and facility siting.
3. State Legislative Reports.
4. Agreement State licensing Statistics Reports.
NOTE; For specific uranium milling and mining projects in which the Agency is providing technical
assistance to States, see the Projects category.
TOPREP — Vendor Reports and Related Correspondence
This category contains topical reports, generally of a technical generic nature, submitted by
vendors, and correspondence pertaining to the NRC review of these reports. General vendor
related correspondence that is not docket specific is also included in this category.
1. Topical reports, dealing with such technical matters as specifications, testing nnd safety
submitted by architect, enginceis and other vendors.
2. Revisions, modifications and amendments to topical reports.
3. Correspondence between NRC and vendors pertaining to the review of submittals.
4. Meeting agendas, summaries, minutes and correspondence pertinent to vendor activities,
programs, methodologies and design criteria.
NOTE; For reports submitted by utilities that are written by vendors on their behalf and that
relate to docketed cases, see the categories for the Docket 50 series.
WASTE MGT - Nuclear Waste Management
This* category is topical in nature and contains records dealing with the activities of the NRC
Division of Waste Management. Each topic has been assigned a number, with the series designated
by a WM prefix. These documents deal primarily with NRC's interaction with DOE and Us future
role in licensing and regulating DOE facilities designed for the disposal of high-level waste in
geologic repositories. This category will be enlarged later to include records dealing with low-level
waste issues and tasks. The documents in this category are:
1. Meeting agenda and minutes of DOE/NRC meetings in which DOE presents information on
their geological exploration program to identify sites for nuclear waste repositories.
2. Briefings by DOE on research being conducted on spent fuel storage and nuclear waste
management.
529
3. Correspondence pertaining to NRC's advisory role in providing DOE with technical assistance
in the Waste Isolation Pilot Plan (WIPPj for burial of defense wastes.
4. NRC draft staff guides for developing positions on the content and format of environmental
reports for geological repositories.
XPORTLIC - Export and Import Licenses
Tins category contains records relating to the issuance of licenses to export or import nuclear
facilities and materials. Included are:
1. License applications and amendments to export or import special nuclear material, source
material, byproduct material, reactors, nuclear facility components or reactor materials.
2. Correspondence between NRC and applicant or licensee pertaining to the review or status
of a pending application or license amendment,
3. Commission letters requesting Executive Branch views.
4. Review and findings of the Executive Branch on whether issuance of a license would be
inimical to U.S. common defense and security.
5. Correspondence from foreign governments, international organizations, and members of (he
public.
6. Staff position papers (SECY series code) prepared for Commissioners review of import or
export licenses.
7. Filings pursuant to hearing requests or intervention petitions, if any,
8. Hearing records and decisions,
9. Memoranda from the Office of the Secretary to the Executive Director for Operations
regarding the Commission decision on issuance of a proposed license.
10. Licenses, license amendments and license renewals for types specified in item 1.
NOTE: For transcripts of Commission meetings and papers submitted for Commissioner
consideration or information, see IOCFR category.
530