7"/ B3 c ? T ■> -i rt HORIZONTAL PERMEABILITY CALCULATIONS SG-20 C-b Lease, Rio Blanco County, Colorado DST Interval Permeability No. feet md. Remarks J 848-894 Injected at unknown rate. 2 945-986 Insufficient decline data SG-21 C-b Lease, Rio Blanco County, Colorado DST Interval Permeability No. feet md. Remarks 2 950-1000 No injection information 3 1000-1036 20. II B 258 MIT No, ] 2 3 4 5 6 HORIZONTAL PERMEABILITY CALCULATIONS Core Hole SG-17 • C-b Lease, Rio Blanco County, Colorado Scries 11210-LL 11210-LL 11210-LL 11210-LL 11210-LL 11210-LL Mul ti -Packer Tests Interval feet 1089-1114 1123-1148 1147-1172 1184-1209 1338-1363 1422-1447 Permeability ind. 75 92 Remarks Packer apparently leaked, or bad gauge Middle packer apparently leaked M ii J I i: \ HORIZONTAL PERMEABILITY CALCULATIONS SG-17 Drill Stem Tests C-b Lease, Rio Blanco County, Colorado DST Interval Permeabil ity Remarks No. feet 1918-1970 md. 4.0 31 32 1966-2020 169. 33 2018-2070 No injection 34 2120-2170 30. 35 2220-2270 No injection 36A 2520-2370 No injection 3GB 231 5- 2370 No injection 37 2395-2460 35. J = Jet t in ■■ Test II B-256 HORIZONTAL PERMEABILITY CALCULATIONS SG-17 Drill Stem Tests C-b Lease, Rio Blanco County, Colorado DST Interval Permeability Remarks No. feet 386-436 md. 1 Did not analyze ■ 2 788-808 Did not analyze 3 822-869 11.0 4 866-919 12.7 5 919-970 34.0 6 967-1017 10.7 7 1017-1067 19.9 8 1066-1116 20.0 9 1116-1166 8.0 10 1164-1212 185.0 11 1200-1224 21.2 12 1215-1224 20.8 13 1224-1251 300. 14 1251-1271 8.0 15 1280-1309 13.0 16 1309-1336 Data scattered 17 1327-1373 52. 18 1373-1419 15. l(l 1423-1470 Test failed 20 14 23-1470 23.9 7\ 1473-1522 3.0 22 1428-1522 4.7 23 1512-1572 4.0 24 1561-1572 23.0 24 (J) 1561-1622 No pressure data. Equipment problem. 25 1618-1640 4.0 25 (J) 1618-1670 1.6 26 1668-1679 30.0 26 (J) 1668-1720 7.3 27 1711-1770 6.0 28 1768-1779 42.0 28 (J) 1768-1820 9.8 29 1818-1870 2.0 .vi 1869- 1S80 275. 30 (.)) 1 86 1.920 30. Jott-inr Test I I Date: March 4, 1975 To: John Matis - PCB-555, Denver From: Charles Martin - R138 Piano Subject: Horizontal Permeability Data for Federal SG Wells Nos. 17, 20 and 21 V Attached are horizontal permeability data for Federal SG Wells Nos. 17, 20, and 21. These values were calculated from drill stem tests conducted by Sperry Sun and Johnston. The method of calculation is described in "Pressure Buildup and Flow Tests in Wells" by C. S. Mathews and D. E. Russell, on pages 12-17 and 72-83. This book is published by the Society of Petroleum Engineers. An example calculation is found in Appendix F. GLvL'U Clvu^v Charles Martin CM:dm cc: A. L. Barnes Attachments II B-2S4 characterized as being of good quality. However, below 1800 feet, the character of the water changed and small isolated intervals of saline water were encountered. This leads to the inference that the saline water at depth, beneath the Mahogany zone under Tract Ob, is confined and is not able to migrate upward. Preliminary data from the lower zone phase of the pumping test at AT-1 tend to corroborate this inference. II B-253a (Jetting tests provide only a composite picture of the entire open hole, at any particular time during drilling.) Therefore, routine jetting tests were abandoned in favor of the more useful drill stem tests during the drilling of SG-17. In addition to the standard, single packer drill stem tests, it was decided that more sophisticated multi-packer tests should also be included in the SG-17 drilling package. A three-packer tool was assembled in which water could be selectively withdrawn or injected into very small packed-off intervals. Attached to the bottom of the tool was a special device used to set the string of packers in the open hole. This special device and packers, in total, was called a "hook wall multi-packer assembly." Pressure sensing bombs were located above and below all of the packers, to detect changes in fluid pressures and to determine packer failure. The tool could be rotated at the surface, and the hook "set" into the rock of the well bore. The packers were then expanded and the test conducted. The major aspect of all three multi-packer test series (conducted on December 8, 1974, January 13, 1975; and January 14 to 15, 1975) was to inject water at rates of 5, 10, 20, and 20+ gallons per minute, into the primary packed off interval. The change in pressures in the various zones caused by this injection of water was recorded by the pressure bombs. After completing the injections the tool was loosened, raised to a higher interval, and another test run. Details on procedures and schematics of the tool may be found in the data section, on the Sperry San data 'beets, and on the Goldcr Associates computer plots. Horizontal permeabilities can be calculated from both drill stem tesl results and multi-packer test results, but the primary objective of the multi-packer testing was to determine vertical permeability. The con- figuration of the and packer assembly permits the collection of pressure data which theoretically can be reduced to yield vertical permeability values. It is of great iinjx)rtancc to be able to establish the probable rate of water inflow from the roof of the C-b underground mine, and this involves both horizontal and vertical permeabilities. The calculated horizontal permeabilities from SG-17 drill stem tests and multi-packer tests are presented in the tables on pages II B-255 through 11 ]\ 2S7. (The table on Page 11 B-253 similarly presents the same informal Lon for the drill stem tests in core holes SG-20 and SG-21.) The tost results indicated that vertical permeability is some1 fraction less than the horizontal permeability, although it could not be positively quantified. Data from many of the multi-packer tests also showed evidence of packer failure and therefore could not be quantitatively analyzed for vertical permeability. This led to the conclusion that multi-packer testing probably cannot give absolute values for vertical permeability o\\ Tract C i ) With regard to the water quality data collected during the drilling of SG-17, it can be concluded that the water beneath the SG-17 location i i ratified into a scries of small aquifers separated by unfracturcd rich oil shale zones. The water in the upper strata can generally be II B-253 II B- 8 AQUIFER DATA DRILL SUM TESTS AND MULT I - PACKLR DATA General Comments Included in this segment of the Quarterly Report arc three primary data items : 1) A summary tabic of the intervals tested and the calculated perme- ability values (provided by ARCo's Reservoir Simulation Group at Piano, Texas) 2) Plots of the data from each drill stem test (made by Goldcr Associates). The plots have been inserted for clarity, although no attempt has been made to discuss the "pressure falloff" analytical methods used. The reader is referred to a book entitled "Pressure Buildup and Plow Tests in Wells," by C. S. Mathews and D. E. Russell. The book is published by the Society or Petrol cum Engineers 3) Data sheets from Spcrry Sun and Johnston pressure bombs used during the drill stem tests and multi-packer tests Del ails of Testing Prior to the commencement of drilling, of SG-17, it was determined thai a detailed horizontal permeability and water quality profile of Tract C-b sub-surface conditions would be useful for many purposes. Mining engineers in particular, were concerned with these two important mine design factors. Therefore, it was decided to conduct drill stem tests at regular intervals a ■ an int< gra] part of the core hole drilling of SG- ] 7 . To conduct these drill stem tests, at any given depth, a packer is lowered on drill pipe. The packer is ;< I a1 some interval above the bottom of the hole and then water is jetted out of the drill pipe for some prearranged i] l rval of time. After the jetting e. terminated, the rise or recovery in water Level in the packed-off zone is I. The horizontal permeability of 1 1 nc can then be calculated from the recovery data. i methods are similar to those used for standard jetting tests described in Quarterly Report tfl. Although substantially more expensive, the drill stem test has several i port ant advantag< ; over routine jetting tests: 1) It allows a direct calculation of horizontal permeability for a particular small interval in the hole. 2) It .allows the collection of a water quality sample from a small discrete sub-surface interval. 3) H can be used to provide a permeability and water quality profile, or picture of how conditions change with depth. I 1 B-252 , 00 rt o 3 H Q t/) rt CO I • r ■ * * i . i * . rt-ri-rr- • : •»"•"»" ■mrm-miim OH.ttO. 1 t> ;■ q /cOxnfaT tHTIRyil fill D m-ut, ft. mCUMIOR colli tl»C"lil * Kll ion irni) ■ m»,n FOUUTtOH - O . ••"• "°* 0 »I1MM Of I • J-ll» It) • !!•« DM CUT) ■ m.ii (rim MOOH LQ*M iiDitM or r CMM IMftI UttHOtl M ■TH IFlltl TNI* linil CHTltH ii CHOI c o! • 4 . .iTn lOTfiriu enm nmeiri ItrC 1 UHMH »innm I t. iii rar.i ■ II. Ill ITll.t ■ , ■ ..;.. : • 4 . 1 " ; * * : :* **:.:., ■■ - t *: . . notes: / Test carried out above the air/woter interface. C-b TRACT HYDROLOGY Borehole no. II Drill stem test no. I Date: A/ov7/974 Interval tested:' 36<& 43&>ff Pressure gauge: Johnston (Upper) Formation tested: Evocuot/on Creek -I •! lf«IK o» MCKfJtl ifltn • O««0ll Ot»I" IF(tl) '"II MC0»O C0N1II-I ■ f«lSl " (Mil "(Fini 1 k n w~- ;■ «.«<( »HI.I I — TTfl TJTJn-lTH.r 111 71. tit tTlt.l ii« ti.*«* irn.i notes: / 7es/ carried our above the. air/water interface Golder Associates C-b TRACT HYDROLOGY Borehole no. /7 Drill stem test no. / Date: A/ov 7./9J4 Interval tested: 3&6> -^stb/f Pressure gauge;: Johnston (Lower) Formation tested: Evacuat'ion Creek q r, - f? PlOT 0 liJJ) '"mi" Piri(i'U :.., ■ ■**»■ 1 JOHN CttlHCt IB - ■ o IIM C II" 0 o Q . it ' M >■:■■■■■'■■ ■>■■: 0 o 0 ~> •> :•:•:•:•: .......... I 1 II" - II ■, \ 111 1; ! "* o • ' : '• '.. ' 0 II". o 0 ii !":!" "":! — - 'j i 1: 1:1:!:: :!::•! :. o ■> 3 II" o 0 0 © O i* ....... tfti.i 0 o o 0, nl "1 o _ - " II" - - o- j"' o > o 0 o ' ■• : ■ ■ ' ■•• •■•••• • j - II,' i II" « 'V- o '. o '. o It - '. o i o B n : n w, ,.,., , O in iit.eoo «»».« J "' '"■ "■' : ; i 11 11 .... .... ..... :.... •:... ••.. 1.' - jj~ ~^1F' i! ■> ■i ", || jjp i : II M " :; l>'!>0. *60«^ ': ■;fl '• I";". t..';S % '• ;c ,o '"•"• ""•' *J ! O 0 ....... ...... ; : 1 ii ; ii- o "• o i: 1 1 if r> ° - - o If: „ .. |: n 0 O 0 - O 0 •1 II- - - IfJ '"■'"' ""•, ~) ' •1 II" *) o ", "• j: o o c 1 II o n O 1 !■ ■ • If" © 0 • n ■'• - e 0 "• IT. Ii n -> " •1 II" " . NOTES: Golder Associates C-b TRACT HYDROLOGY Borehole no. II Drill stem lest no. g> Date: Nov 9 1974 Interval tested : 788 - 80& H Pressure gouge: , Johnston (tower) Formation tested: Evocuo//on Creek formation SG- /7 D.S.T. - •1 TIM ••::;?:• ■&■?,'», , '•' •""• '■••• '..;," Z'L"Z l!"™7 : -" ' ; :'"" ; . .. . 11 ! 0 l » ...... „.,.. j ; : : 0 « •"■•• •• : : ■ : : c "'1 11 • ,„.... .,.,.. : : j i II' Q »•••■■ »»•• : j i r O ,„.,., .,.,.. : | ; ; ; 1 • '• 0 If o o • "■I » o i : o • ,.:::;:::..::::•:..: ;,.„ «"•! ■""■ ••■» ■•••: j -j- o 0 •■ i ii;-;:: :;:;•: :. . . . i ,,;,,, ! ..;.... ...... "•••••••: : o o If" o . o o ; °* li Wl'.lll ll\*'.\ • ■ •:••*': :.. . - o n iiiiiii Hi;!: i •':. o o ° !! Wi'.llt IWi'.l '• '■ •t , ■11 Si ; 1 1! ; r "•:. . ! i e D", 0 0 'I i!";*oo »s'»!* ■ i I i : o ■'•' O >• 0 J» -ff-f} '; • o ° If o~ • o « Wi'.rV* "'!;! • ■ II" o 0 O " .■ I i : :': : : 0 0 o O "■| " ,u ,.. : ./;. „>.... ...... '• o » o -■■■ •• : ! j - | c o ©. Tfl IS). Ill HHI ■ '■: 0 II ■? o ""■••• : r o isi.im m* * • " V :: j if '1 1 a »*•».» • • : '"! : ii- * •5 - © o r ^ "' ■«.,.. «... i ii" c - 1 0 •1 ... „..,.. „,.., If • „ , ,„ '"•'•■ ••••■' ; : • I ,„ „.,.. — j : ii*! 0 ; ; ' - '" "••'•■ ■ • • i i j o ■o Z Z ! j o 0 1 «™ ""' ! i II" o 0 o o 11" o 0 i Si! i »; i »' • .11 notes: Golder Associates C-b TRACT HYDROLOGY Borehole no. 17 Drill stem test no. 3 Dote: Nov I/J974 Interval tested: &ZZ-8ft Pressure gouge Johnston (upper) Formation tested: Porachufe Creek above the. A Oroove SG- /7 D.S.T. • notes: C-b TRACT HYDROLOGY Borehole no. / 7 Drill stem test no. 4 Dote; Nov I?, 1974 Interval tested: &&>&>-9l°) f/ Pressure gauge: Johnston ("Lower) j Formation tested: Parachute, Creek o6ove the notes: Golder Associates C-b TRACT HYDROLOGY Borehole no. II Drill stem lest no 8 Date: A/ov20,/97a Interval tested- /Ototp- lll(j> M Pressure gauge: jof^ns-fon (Middle) Formation tested: Poroc/iL/fe. Creek ohove. Jhe. A Groove SG 17 D.S.T. - 8 notes: C-b TRACT HYDROLOGY Borehole no. II Drill stem test no. 9 Date: A'o^ ?e/974 Interval tested: Wic-J/Woft. Pressure gauge: Johns-ton (Lower) Formation tested: Porooho-fe __<2^i.^afl^fr •"•'■'"• " - % I y AMNULUS PRESSURE RESPONSE NOTES STEM PRESSURE RESPONSE Golde r Assoc i a t es C-b TRACT HYDROLOGY Borehole no 17 Drill slem test no // Dote Nov Z5, 1974 Interval tested lZOO-IZZ4fl Pressure gouges . 5perry Sun Formation tested Parachute Creek A Groove SG- 17 D.S.T.- // ANNULUS PRESSURE RESPONSE STEM PRESSURE RESPONSE NOTES Golde r Assoc i a t e s C-b TRACT HYDROLOGY Borehole no 17 Drill slem test no tZ Dote Nov. Z(o, 1974 Interval tesled I2IJ -1224ft Pressure gauges SpGrry Sun f UohnS'ton Formation tested Parachute Creek A Groove SG- 17 D.ST- IZ ANNULUS PRESSURE RESPONSE notes: Golde r Assoc i a t es STEM PRESSURE RESPONSE C-b TRACT HYDROLOGY Borehole no 17 Drill stem lesl no /3 Dote A/ov?7,/974 Interval tested ieea-IS50ft. Pressure gouges Sperru Sun For mot i on tested Parachute. Creek above the m/ne roof. SG- /7 DST- /3 ONNULUS PRESSURE RESPONSE NOTES Golder Assoc i a tes STEM PRESSURE RESPONSE C-b TRACT HYDROLOGY Borehole no n Drill slem test no Id Dole Nov 29.137a Interval lested 1251 I2BO/) Pressure gouges Sperru Sun Formation lesled Parachute CreeA mine rtxif SG- H DST- 14 ■-.. ANNULUS PRESSURE RESPONSE NOTES Golde r Assoc i a tes STEM PRESSURE RESPONSE C-b TRACT HYDROLOGY Borehole no 17 Drill slem lesl no /? Dole A/o^ 30, 1974 Intervol lested IZ80-I309F+ Pressure gouges Sperry Sun Formolpon tested Parachute Creek Mining Zone SG- 17 DST- 15 ui_ ■ jh^J NOTES: Golder Associates C-b TRACT HYDROLOGY Borehole no 11 Drill stem test no. !•• '■"" • '»"• • .0.T0- 0> ••!>■•• Ilffl* ■ 1111 • I.tTM V f.( II) . ( .: :.;,: :,',: :,:,\\V." ■ I ;• : i i \ \ -.»■■■ Golder Associates C-b TRACT HYDROLOGY Borehole no. 17 Drill stem lest no. 17 Dote: Dec 3,117a Interval tested: /3S7- 374ft Pressure gouge: Jonns-fon (Lower) Formation tested: Parachute Creek be'ov the. mine S7oor SG-/7 ANNULUS PRESSURE RESPONSE STEM PRESSURE RESPONSE notes: C-b TRACT HYDROLOGY Borehole no 17 Drill slem lest no 18 Dole Dec 4. interval lested 1373-1419 H Pressure gouges Sperry Sun Formotion tesleO Parachute Creek straddling 8 Groove NOTES: / 7ks? aborted and rerun as D.S.T. eo Golder Associates C-b TRACT HYDROLOGY Borehole no. n Drill stem test no. 13 Dote: DectbJ974 Interval tested: /4?3-llJ70ff Pressure gouges: Johnskn (Upper) Formation tested: PorocSiofe Creek be/on Me 8 Groove so- n D.S.T. ANNULUS PRESSURE RESPONSE NOTES : E^f... '": *, Mil r»"':""-:-~-T-".-;- . . .: ; ; i • * I II HilH-i : - ■ ' : I ™ STEM PRESSURE RESPONSE C-b TRACT HYDROLOGY Borehole no Dot « /rw 17 Drill stem lesl no ?0 IS- all j p 1 \\ v\ ANNULUS PRESSURE RESPONSE STEM PRESSURE RESPONSE notes: C-b TRACT HYDROLOGY ANNULUS PRESSURE RESPONSE STEM PRESSURE RESPONSE NOTES Golder Associates C-b TRACT HYDROLOGY Borehole no 17 Drill stem lesl no 22 Dole Osc IO./974 Interval tested:/429-/S2?« Pressure gouges 5ofr-/-v Sun 4 Johnston Formolion rested Parachute Creek Os/ow the B Gnooi/e SG- n D.ST- 22 ANNULUS PRESSURE RESPONSE notes: STEM PRESSURE RESPONSE Golder Assoc i a tes C-b TRACT HYDROLOGY Borehole no 17 Drill stem tesl no Z3 Dole Oeir IZ,I'?T4 Inler vol lesled W4- 1572 ft Pressure gouges 5perry 5<-/n Eormotion lested Parachute dreek tpeloiv the & Groove SG- 17 DST- Z3 iNNULUS PRESSURE RESPONSE NOTES STEM PRESSURE RESPONSE Golder Associates C-b TRACT HYDROLOGY Borehole no 17 Dr. II slem lesl no S4 Dole Jon PO, 1975 Inlervol lesied 156/- 1623 fr Pressure gouges Sperry Sun Formolion lesled Parachute Creek below fhe £> Groove SG- 17 D S T - ?=%• i ^i S J; I: ■ 5 ii- 'i Nit' - r :ir. „ t £ re ;; .»***« : § =1 = STEM PRESSURE RESPONSE C-b TRACT HYDROLOGY Borehole no II Drill slem lesl no 2(D Dole De>cJ7J°i74 Inter vol lesled ltctoe>n?0# Pressure gouges Sper-ry Sun Formolion lesled Parachute Oeek Oe/ov* /he 3 ^~?nirft w» : - - w- ( ANNULUS PRESSURE RESPONSE STEM PRESSURE RESPONSE notes: C-b TRACT HYDROLOGY Borehole no 17 Drill stem lesl no Z~r Dole Pea IB, 1974 Inlervol lesled I7l/-I770ff. Pressure gouges Sperry Sun For mot i on tested RoraChute OeekL p&lotv the S Groove w» ANNULU5 PRESSURE RESPONSE NOTES STEM PRESSURE RESPONSE C-b TRACT HYDROLOGY Borehole no 17 Drill slem lesl no ZS Dale Pe.a /9 /974 Interval tested I7&8- IBZOfl Pressure gouges Sperry St_,n Formation tested P>or&chute Cr-eek t>e/o^v the & Groove I j •ill ; j M - • s f':5: " ANNULUS PRESSURE RESPONSE NOTES STEM PRESSURE RESPONSE Golder Associates C-b TRACT HYDROLOGY 8orehole no II Drill stem lest no ?9 Dole Oec &,l°>7a Interval lesled /8/8VS70/X Pressure gouges Spar-i-y Sun Formol.on lesled Porac^u/e OeeM be/oyy /he 8 Groove SO- 17 DaT. 23 ; '■" •-V-" V itutw • ci •ana • • ; Hji: -I li li- ki) : 1 -.-Si ; ^ f 3?! •' % -J. ~: '■': ■: " i. 33 Bi. h I nirj 4 ■ ■ 1 isffii 1 «!'!■! : i ii b :TIil .. ANNULUS PRESSURE RESPONSE STEM PRESSURE RESPONSE notes: C-b TRACT HYDROLOGY I * .T.. Tlrrm >, •! % "* *•'■"• • > (1.01(1 l«0i Golder Associates C-b TRACT HYDROLOGY Borehole no. /7 Drill stem test no. 32 Dote: Dec 3/./9T4 Interval tested: /9fato-ZO2O0 Pressure gouge. Jo/7r?s-for? (upper) Formation tested: &Qrac/?u+e* Creek above the /ower rich zone so-/?- D.S.T. - 32 41| 1 ■ ■ ; iJ=i ! ■ Hi. ,<„< * i*». — i- ; 1 ~ | '. ' Ti §! . ' r '. 1 I?=i ? ; i ii= = : i 51 =; : -' ::;:!, ! • "I' •-ill! = :" H : § sen '. i ii ~ •j • " 1. jigs ;■ 1 1! |i . - . . : • ===i •'Iff! ANNULUS PRESSURE RESPONSE notes: ;■ lZZ^^ZZ^J : : =•="_ :-:: : ■ -: ... _ : |i|| """'-■-. '; i Hsj ,. fljf ■; j 1 |i " [""r'r-rt | : j !l M|lr[ LI : :: : ■ ; •= i- ; : : is Hi ■- , ': '. -:S f: ! If 1 ? tlF! w STEM PRESSURE RESPONSE Golde r Assoc i a tes C-b TRACT HYDROLOGY Borehole no 17 Drill stem test no 33 Dole 7onP,/975 Inlervol tested ?0/8-?070ff Pressure gouges Sperru 5un For mot ion tested Parachute Creek tower rich zone SG-/7 D S T - 33 c V^iJAlll^JI-ttUjy^yju f i - : - -r = i j iifll !-i-' II • = :i.Jli • " ! - i'-'S-l i • 1 |§§ .' | 11 |ij --; j . St xx j« '■: IP;;: I lilli E Si! 3 ;: ' ii?'"1 EJs- ANNULUS PRESSURE RESPONSE NOTES. ;, * c ?== ; >=?!;' ■■■ ■ '! ggli ■ • ; ri**! " * :... ' !: |||! :: ' ■:■■:■:■:■;.:... : ■: :^ ¥■ m •J Sfl • E II 11 . STEM PRESSURE RESPONSE C-b TRACT HYDROLOGY Borehole no n Drill slem lest no ~ — _ ■*"■ "wiimt __i ; j°" ' 3* -r! Golder Associates C-b TRACT HYDROLOGY Borehole no. II Drill stem test no. 35 Dote: Jon(b/<$75 Interval tested: 22BO-Z Pressure gouge: Johnston (Upper) Formation tested: Poroc/ha/e Creek beJow /he, /o\*/er neb zone sg- n as j. 35 '■_" ' *: .,,. ...... . ,..., iiimi '""■" : ./...I - • '"'. Euhwk f. iii^ ■ • iiii.ti - - — - - ,. ■ .::: - - — , .... • 1 _ - e - - ic ™J.™...„ •( '•* zz r= ••:--••-;• r - 1° :•••. •:•■•;••!• .:. :... ;: : ; - -!° - :„.' notes: / fes/ aborted rerun as D5 T 3&3 Golder Associates C-b TRACT HYDROLOGY Borehole no. 17 Drill stem test no. o&A Dote: Jon.e,/975 Interval tested: zizo-znofl Pressure gauge: Johnston (Lower) Formation tested: Porachu/e. CmeU t,eto\v the. tower rich zone SG-/7 D.S.T. -3&A 4NNULUS PRESSURE RESPONSE STEM PRESSURE RESPONSE notes: Golde r Assoc i a tes C-b TRACT HYDROLOGY Borehole no 17 Or ill stem test no 368 Dote Jon 8, 1975 interval tested ?3/5-e370f* Pressure gouges Sperru Sun Formation tested Parachute Creek below the /ower rich zone SG-/7 D S T - 36 B CI 1 notes: C-b TRACT HYDROLOGY o d » ._ Golder Associates C-b TRACT HYDROLOGY Borehole no. ZO Drill stem test no / Dole: Oec^,/S>7a Interval tested: 89<£-'3 .i_jii:ii! !si:i : : : : : ! !! "! ! " o i ;: • i — : - -_: j — o - ;; ::::!!! :::;:: : ■ \ \ : '.', : — ! - o i i i i - i ; ;: ; - : ; _; o o "'■"" ""'■'" , p p ! o '..-.,- .„ . , : - ; - :- - : i in .. ; I i : — ~i 1 ii 1 ; ! i • i^ij* iiit-» .. ■ ; -; — -; - : i ii I ; 0 ahr^* "*■"' "■■-' : : • :, ; : ' -■•-[— ° *^ - '::';. '"'. ;.:.";. ,i..!!|r"!:' ' ••;•"-•-! o . ° ° :;' Si: :;:::: :....:...: : ......... o. ■.•:•■:,,: :, : ' ' 1° •J ',])": :;;' : : • : : ; ■ ;' "•■';■■ »•!_- .- :o - ?o ' 11 -^ :.-:; i iiT;;--; — ■>; '"-.' :'.:.:■ '"■ '■ ' ' ; . ; • -:":'.' :. . " ■ • ;; "ii:!: iiiii: : : - : : " : ;: : : ; . • e - ; ; ; ; . ; - - ; • : i i : i __ m :: :;;:::: :;:: : : : : ; ; • c :: :;::;:; :;:;•: : : I : : : e .'- : ; ; ; : i •. i i - i __. 0 , : : : : : *( ; ; ; • ; • n! i« iu.ui ...... : : : ; : i ii i " i — • •'•; : ; : ; .: : i i - ; 0 : " "! — ,o ! : "• •"• ■■ i ; " i - i o ■ : i j : :: i- : i " : °. " : : : : : :0, i 1 i 1 i ■V : : : : : i° - I" ....... ...... ; • • ;i • j • : : - i i : '•'.'.'.'. . • • ^ : :', : ; • • Ml 11 . I i i i '' ■ ■ • • 0 1 • "• •' : ; ; ! ■ _._j„„ . c : : ; — 0 ; o : :. : i : . e in ....... ...... ..... ! ! : ! : - o „. " -"• ■ - i i ii i ' ■■! i 0 0 •°: "• •"• '■• : : : : ; : :,' ; ,° ■• •■• i i i ii i : ; - o .? : : : : ; ; * ; ; o 0 : ; : ; n "' •"■ '■• : - .'O' :;:::- ■ ;«,, » J ! ; ; ° . . ' ; : ;: • m ! • • ... .....I. ...... ; : ; ; ; V • o ; '■ |.j j '■ ° '■''•-. '•■■'• -: ! . • ", "' "• "•■■ : : ' : j: _ • ::: :::::' :r: j.'.'.v.ii'.v.'.!wV-i'f"i" 'l'""!''''.!.^'.'::.. ,,:,..'■: NOTES: C-b TRACT HYDROLOGY J Borehole no. BO Drill stem lest no. S Dole: Dec II, 1974 Inlervol tested : 945- 986 ft Pressure gouge: Johnston (lower) Formotion tested: Parachute Creek above the rn/ne roof s ijmm---^-----i-- ::[■::.[■:. , : -i : '::: „ i i : : :.-i : ;- i i ° »- >„.,.. ...... : | o - o .. »!.'.. ...... j : i : : i : r — : i ;. ! • - jo "• u,m *■* : Golder Associates C-b TRACT HYDROLOGY Borehole no. £7 Drill stem test no / Oote. Dec /9 /974 Interval tested: /000/036?// Pressure gouge: Jotins-for? (Upper) Formation tested: Parachute Creek above, /he mi'oe roof SG- 21 D.S.T. - I i--r : : Is J : ' : ■ I siil I ANNULUS PRESSURE RESPONSE notes: STEM PRESSURE RESPONSE Golder Associates C-b TRACT HYDROLOGY Borehole no Zl Dr-ill Stem Test no srr-^ Sun For. tested Parachute Creek £?oft Pressure gouges Sperru Sun Formation tested Fttr-achuts Creek, above the A Or-oove SG- n MPT- /-<< ANNULUS PRESSURE RESPONSE "BOTTOM OF HOLE" PRESSURE RESPONSE NOTES : Golde r Assoc i a tes C-b TRACT HYDROLOGY Borehole no /7 Multiple packer lest no I -A Dole Dec &, /9774 Interval I e s I e d IOH6. - I/I&, ft Pressure gouges Sperr-u Sun Formation tested Pior*Qc:/7ute fl Pressure gauge: 'ohns-fan (Lower) Formation tested: Parachute Creek mm/no z.one SG- /7 D.ST. - /S ANNULUS PRESSURE RESPONSE notes: Golder Associates STEM PRESSURE RESPONSE C-b TRACT HYDROLOGY Borehole no II Drill stem tesl no 17 Dole Dec 3,1974 Inlervol lested 1387-/374 ft Pressure gouges Sperr-y Swn Formotion tested Parachute Creek below the Mine P/oor SG- a DST- 17 Golder Associates C-b TRACT HYDROLOGY Borehole no. // Drill stem test no. /7 Dote Oec 3. /97~14 Intervol tested- l&ii-IKtOft Pressure gouge: jo*r>s-tor? (Upper) Formotion tested Porachute. Creek beJov, the. B Groove SG- n D.S.T. " Z? ZJ H-l Golder Associates C-b TRACT HYDROLOGY Borehole no. /7 Drill stem test no. 32* Dote: Dec 3Z./974 Interval tested: /9(o(d-20ZQ& Pressure gouge : Johnston f Lower) Formation tested; Porochute. CreeA above the, fo\A/er rich zone. SG-/7 D.S.T. - 32 .tl:,:,- ;.;.:.;/, !o! "• ■ S : . : i ° o ..i ■»• » : 1 • -'u ! !n !!!" : i : • »■• : 1 ; 1 ■ !■; i ° i!! : '",'. Z'.'. ; ; ; ! -- i : NOTES c-b TRACT HYDROLOGY Borehole no. /7 Drill stem test no. 33 Date: Jon?j975 Interval tested: ?£>/g - 2O7O0 Pressure gouge : Jonns-ton (i//ty>er) Golder Associates Formation tested Parachute, (s-eek lower rich zone SG-/Z D.S.T. - 33 I lit! ANNULUS PRESSURE RESPONSE STEM PRESSURE RESPONSE NOTES Golde r Assoc i a tes C-b TRACT HYDROLOGY Borehole no Zl Drill stem lest no / Date Dec '9. 1974 Interval tested /OOO-/03&M Pressure gouges S&erry Sun Formation lested Parachute Creek &bo\se the mine roof SG- 27 DST- / ZONE I PRESSURE RESPONSE ZONE 2 PRESSURE RESPONSE notes: Golder Assoc i a t es C-b TRACT HYDROLOGY Borehole no /7 Multiple pocker test no hZ Dote Dec 8. '974 Interval lesled l^49-f^80ft Pressure gouges 5perr-q Sum Formation tested Rora-cftute Creek Mtn& Roof SG- n M P.T- t-Z THJS PAGE WAS INTENTIONALLY LEFT BI.ANK 1 1 B- 303 DRILL STEM TESTS WELL SG-17 II B-324 i HwSTOM 1 :•> \ f] 1 1 u J n ' ! I 0 j ii ?y U; j :ucjv i! r i f -■ ■■■ "^T*f 3 II B-325 F.R. #04361 C PRESSURE LOG5" p) o c o r n o 5 D ID O n at a a M 3 n Field Report No.. Instrument: Number 71 >- /J"^ O c 79 J5^- /6CC /G30 /760 /73$ /fiffl /gzo Page: 1 l OLD .found o better way SURFACE INFORMATION ^k)t;o^ (Rate of Flow) Dpened Tool L IGHT BLOW CLOSED TOOL FINIS hi ED SHUT- I N_ RF-QPFNED TOOL LIGHT B L OW STARTED INJECT I NG WATER LNn TO FORMAT I ON PUMPED IN AT 5 GAL. /M I N. FOR 15 MINUTES. SHUT Time 1425 Pressure (P.S.I.G.) 1426 1456 1513 1557 Surface ChcAe DOWN FOR 3 MINUTES. PUMPE IN AT 10 GAL. /M IN. FOR 15 MINUTES. SHUT DOWN FOR 9 MINUTES. PUMP ED I N AT 20 GAL./MIN. FOR 15 MINUTES SHUT DOWN FOR 16 M I NUTES. PUMPED IN AT 20 GAL./MIN. FOR 15 MINUTES. LET PRES- SURE BLEED OFF FOR 33 M I N- UTES CYCLED TOOL PULLED PACKER LOOSE 1815 EQUIPMENT & HOLE DATA Type Test . Formation Tested Elevation M.F.E. OPEN HOLE GREEN RIVER 7036 G.L. Net Productive Interval ~ Estimated Porosity <-V Ft. Ft % All Depths Measured From . G_ROUN,D LEVEL. Total Depth 436 Main Hole/Casing Size 6 — 0/_4 Rot Hole/Liner Sire Drill Collar Length Drill Pipe Length Packer Depth(s) Ft. 327' 30' 380 c, 386 .I.D._ .1.0. - 2 1/8" 2 5/8" Ft. MULTI-FLOW ^VALUATOR FLUID SAMPLE DATA Cushion Type Amount Pressure Bottom Choke 3/4" iize °l ^ MUD DATA Mud Type Wt. Viscosity , Resist: of Mud Chloride Content Water loss -@ 'F; of Filtrate C.C. _ °F PPM Sampler Pressure Recovery: Cu. Ft. Gas cc. Oil cc. Woter cc. Mud Tot. Liquid cc. P.S.I.G. at Surface Gravity Ga»/Oil Ratio - °API @ cu. ft./bbl. RESISTIVITY CHLORIDE CONTENT Recovery Water Recovery Mud Recovery Mud Filtrate Mud Pit Sample Mud Pit Sample Filtrate @ @ @ CF. °F. °F. °r. ppm ppm ppm RECOVERY DESCRIPTION NO WATER RECOVERY) FEET BARRELS I % OIL ■ % WATER % OTHERS API GRAVITY @ °F. Co) @ @ @ RESISTIVITY @ @ @ @ @ @ (&> CHI. PPM Remarks: DUE TO THE ABSENCE OF FLUID IN THE H 0 LE_T H E RE_WAS_NO_P RE SS JURE. INFLUENCE ON. THE CHARTS PRIOR TO START OF I N J E CT I 0N_._ Address I'or.y SHALER MOTEL? RIFLE, COLORADO 81650; ATTN: MR. D. B._1A1I ATLANTIC RICHFIELD COMPANY Field SORGHUM GULCH Well FEDERAL S-G-17 Test Interval 386' to 436' Location sec.16-3s-96w TT T> "17 - l0Cat,on 11 B'^7 _Te,t# J Date _ _ 11-7-74 County RJ.0 f State Technician MC " *- " '" ^ v i-_ state 1 Aiirwi 1 m( VERNAL j L AUGHL I N\ Telt Approved By COLORADO MR. D • B . T A I T Field Report No. No. Reports Requested 04361 C Page 2 an JOHNSTON ...found a hotter way PRESSURE DATA W ristrument No. Capacity (P.S.I.G.) Instrument Depth Instrument Opening D-essure Gradient P. S.I. /Ft. Well Temperature F. Initial Hydrostatic Mud Initial Shut-in Initial F low J-029 2800 365' INS IDE 80 Final F low Final Shut>in Final Hydrostatic Mud Field Report No. 04361 C TIME DATA Time Given Time Computed . M i n s . Mins. . M i n s . . Mins. . M i n s . .Mins. Mins. Mins. .Mins. .Mins. _Mins. Mins. lark: 'Shut in pressure did not reach static reservoir pressure. Clock Travel inches per min. PRESSURE INCREMENTS PO l r Point ^ ' ;nutes us Pressure T + At Poin' T+At At 5 II Minutes | Pressure | At | ! 1 Point Minutes T + At Pressure ^M ' n" 7. 1 ' 56 152.9 H6 63.3 • ? 29.3 58 155.8 118 62.7 A 44.0 10 155.8 120 62.2 6 55.9 62 155.8 8 121 59.9 0 70.7 64 155.8 122 52.9 10 76.9 66 155.8 124 52.0 12 80.3 68 155.8 126 52.0 - 14 84.9 70 155.8 128 52.5 1 *T ? 15 84.9 6 71 155.8 130 • 52.5 C 1 o 16 54.8 72 134.2 1 132 50.8 18 41.7 74 118.9 134 50.8 20 41.7 76 113.8 9 135 50.8 .22 41.7 78 108.1 24 42.3 :• 80~1 103.0 26 107.5 82 97.9 28 127.4 84 93.4 30 136.5 86 90.0 32 139.9 88 87.1 34 143.3 90 93.7 36 145.6 92 81 .5 . . 38 147.3 94 79.2 4 39 147.8 96 77.5 40 120.0 98 75.2 42 96.2 100 72.9 A 43 96.2 102 71.2 W 44 132.5 [7 104 70.1 4(> 126.3 106 66.1 Ac 135.3 108 66.1 50 139.3 110 66.1 T I V> tTO 52 1 47 . 8 112 65.0 11 15-jZo 54 152.4 114 63.9 cor J T 1 N U E D CONT NUED tLD .found a bettor way GUIDE TO IDENTIFICATION OF DRILL STEFV1 TEST PRESSURE CHARTS r JOHNSTON FIELD REPORTS REPORT NO. RECORDER NO. CAPACITY REQUCSTEO ' £ JOHNSTON ^--J»R«~. j FIELD REPORT NO. 04361 C CAPACITY 2800# © A. Initial Hyd. Mud B. Initial Shut-in C. Initial Flow D. Final Flow E. Final Shut-in F. Final Hyd. Mud The following points are either fluctuating pressures or points indicating other packer settings, (testing different zones). A-l, A-2, A-3, etc. Initial Hyd. Pressures B-l, B-2, B-3, etc Subsequent Shut-in Pressures C-i, C-2, C-3, etc. Flowing Pressures D-l, D-2, D-3, etc. Subsequent Final Flow Pressures E-l, E-2, E-3, etc. Subsequent Final Shut-in Pressures F-l, F-2, F-3, etc. Final Hyd. Mud Pressures Z — Special pressu'e pci~:s such as pumping pressure reccmed for formation breakdown. ■BjV. RECOSDt'f* NO. J- 029 REPORTS REQUESTED 5+ o 12.4 56 166.9 116 84.8 2 40.7 58 169.2 , 118 84.3 4 58.8 60 169.7 120 84.3 6 71.3 62 169.7 8 121 84.3 8 85.4 64 169.7 122 77.5 10 95.0 66 169.7 124 73.0 12 99.0 68 169.7 126 73.0 14 102.4 70 169.7 128 73.0 15 104.1 6 71 169.7 130 73.0 16 91.6 72 164.1 132 73.0 18 69.6 74 139.2 134 72.4 20 65.0 76 133.5 9 135 72.4 22 65.6 78 128.4 24 65.6 1 80 122.8 26 116.5 82 117.7 28 139.7 84 113.7 30 151.1 86 110.3 32^ 155.6 88 106.9 34 158.4 90 104.1 36 161.3 92 101.8 38 162.9 94 99.6 39 164.1 96 97.3 40 155.6 98 95.0 42 119.9 100 93.3 43 117.1 102 92.2 f 44 140.9 7 104 90.5 46 153.9 106 84.8 48 144.3 108 84.8 50 155.6 110 84.8 II B-330 5r' 15'i.r, 11," 84.8 54 166.9 114 84.8 cor T I N U E D CON r I NUED .found a better way \ GUIDE TO IDENTIFI r,CAT!ON OF DRILL STEM TEST PRESSURE CHARTS A. Initial Hyd. Mud B. Initial Shut-in C Initial Flow D. Final Flow E Final Shut-in F. Final Hyd. Mud JOHNSTON FIELD REPORT NO REPORTS RECORDER NO. CAPACITY REQUESTED A F\ / r 1 / B-l / B / \ \ I > ^ 1 \ / D / I C-4 / C-3 C-2 C-l *v. C \ The following points are either fluctuating pressures or points indicating other packer settings, (testing d:tierent zones). A-l, A-2, A-3, etc. Initial Hyd. Pressures B-l, B-2, B-3, etc. Subsequent Shut-in Pressures C-l, C-2, C-3, etc. Flowing Pressures D-l, D-2, D-3, etc. Subsequent Final Flow Pressures E-l, E-2, E-3, etc. Subsequent Final Shut-in Pressures F-l, F-2, F-3. etc. Final Hyd. Mud Pressures Z — Special pressure points such as pumping pressure recorded for formation breakdown. — p— p m FIELD REPORT NO. RECORDED NO. 04361 C CAPACITY J--405 FiEPORTS REQUESTED WS' 2800# 5 + (8)© 0 II B-33] • •. D ® jok?t ;..: - i • rv Cj^ u I IL II B-332 F. R. # 04362 C COS 9 O x . V 00 w — 00£0 y qizo OQZO 0011 0001 L__. ; • • i • t • ■ , - 0010 • r|- 0C90- 1 -- •-■ «o ^^ 9~^ — a t : ■ ■ tL Q . '• •" •> < o ' "J a h S 1 o \ r. i i IL -9 a: 3 O I 00Z0 II B-333 ■ Page 1 JOHNSTON ...found a batter way SURFACE INFORMATION ^^.ription (Rote of Flow) Opened Tool Time 0218 Pressure (P.S.I.G.) Surface Choke MEDIUM BLOW CLOSED FOR INITIAL SHUT-IN 0230 - - F 1 N 1 SHED SHUT- 1 N 0300 - -. RE-OPENED TOOL 0315 - - INJECTING WATER INTO FOR- MATI ON. PUMPED 1 N 5 GAL. /m IN. FOR 15 MINUTES. PUMPED IN 10 GAL. /m IN. FOR 15 MINUTES, WITH 10 MIN. PRESSURE DECLINE. PUMPED I N 20 GAL./m I N. FOR 1 5 M I NUTES , Wl TH 10 MIN. PRESSURE DECL I N . PULLED PACKER LOOSE 1045 - - jft w~^ Cushion Typo Amount Pretiun* Bottom Choke .... 3/4" MUD DATA W.,,d Typ» ~ Viscosity .. ~ -. Roiist of Mod ~ (S> - °F; ol Chloride Content Wt Wotpr l«t« Filtrate c r (Si "F PPM EQUIPMENT & HOLE DATA Type Teit Formation Tested Elevation M. F. E. OPEN HOLE GREEN R I VER 7036'* GRD. Net Productive Interval Estimated Porosity Ft. Ft 20 All Depth, Measured From GROUND LEVEL Total Depth Main Hole/Casing Size Rat Hole/liner Size Drill Collor Length . Drill Pipe Length Packer Depth(j) 6 3/4" Ft 327* I.D. 2 \W 439' ■ n 2 5/8' 784 & 783 Ft. MULTI-FLOW EVALUATOR FLUiD SAMPLE DATA Sampler Pressure Recovery: Cu. Ft. Gos cc. Oil cc. Wafer cc. Mud Tot. Liquid cc. Gravity P.S.I.G. of Surface 'API @ °F. Got/Oil Ratio ■ cu. ft./bbl. Recovery Water Recovery Mud Recovery Mud Filtrate Mud Pit Sample Mud Pit Sample Filtrate RESISTIVITY @ CHLORIDE CONTENT @ @ @ ppm pom ppm RECOVERY DESCRIPTION FRESH WATER FEET 388 BARRELS 1.85 e/o OIL °i WATER % OTHERS API GRAVITY @ F RESISTIVITY @ °F. CHI. PPM @ °F. @ °F. ;■ @ °F. @ °F. @ °F. @ °F. @ °F. @ *F. @ °F. @ °F. @ °F. @ °F. @ °F. <(>■ F. B.mnrlrn Adrf.*. C/° SHALER MOTEL; RIFLE, COLORADO 81650; ATTN: MR. D. B. TA 1 T >p<>ny Test Intrrval County Technician FEDERAL S-G-1 7 788' TO 808' location sec. 16 - 3s-96w __ T..1 # J rw. 11-9-74 fLANCO • ( VERNAL ) Stale Test Approved By COLORADO II B-334 MR. D. B. TA I T Field Report No. No. Reports Requestod 04362 C Page 2 JOHRJSTGfti ...found a bziisr way PRESSURE DATA ^ Instrument No. J -029 ^Capocity (P.S.i.G.) 2800 F ield Report No. 04362 C Instrument Depth 771 * Instrument Opening INSIDE TIME DATA Time Given Time Computed Pressure Gradient P. S.I. /Ft. Well Temperature F. 80 Initial Hydrostatic Mud A Initial Shut-in B Mins Mins. 1 ri 1 1 1 a 1 Flo W C Mins Mins. Mins Mins. Mins Mins. Mins. Final Flow D Mins F ina 1 Shut-in E Mins Mins. Final H ydrostati c Mud F Remark s: Shut in pressure did not reacti staff c reservoir pressure. Clock Travel 0. 0j382 inches per min. PRESSURE INCREMENTS Point Minutes Pressure 1 \t Point T • \t t Minutes Pressure \t Point Minutes T + At Pressure \ t # 0 14.5 1 1 43. 3 22 109.8 I 5l 145.0 I 23 I 24 109.8 10 145.5 24 143. 26 109.8 15 146.1 25^ 1 43. 28 109.8 20 .7 143. 30 109.8 25 '4.2 27 143. 32 109.8 30 147. ^ 2 1 43. 34 109.8 35 " . • . 36 109.8 40 147.2 30 143. 38 109.8 4 45 147.2 144.4 40 109.8 6 0 31. 70 14 . 109.8 1 48.0 90 14 . 9 44 109.8 2 65.6 110 ..0 4«. 88. 3 83.7 130 146.1 10 48 88. 4 99.0 150 147. 10 0 88.2 5 S.7 170 147.2 1 112. 6 116 0 190 147.8 2 125.7 7 122.8 210 147.8 3 1 -. . 8 127.9 230 147.8 4 134.2 9 132.5 7 243 147.8 5 1 3t . 10 ' 1.8 7 0 147.8 6 139.3 11 1 7.0 8 1 160. 7 139.9 12 1 3 .7 2 119.4 8 140.4 13 1 l. 1 4 110.9 9 141.* 14 141 .0 6j 110.4 10 142.1 * 15 141 .6 8 110.4 11 142.7 1 142.1 ' 1 1 0. 4 12 144.4 17 142.1 12 110.4 13 144.4 18 14: . 14 110.4 1 1 B-335 14 144.4 1 l 142. / 1 110.4 1 144.4 20 14: . 1 ■ . ' 1 1.4 21 143.3 20 109.8 17 144.4 Page 3 joh^sto;\3 . . . found a batter way PRESSURE DATA _ Instrument No. J -029 Field Report No. 04362 C E DATA Time Computed Mins. . | Mins. W Capacity (P.S.I.G.) . In strument Depth Instrument Opening Pressure Gradient P. 5.1. /Ft. TIM Time G i ven Mins Mins Well Temperature F. Initial Hydrostatic Mud A Initial Shut-in B Initial r la « C Mins . , Mins. Mins. Mins. . I Mins. Mins Final Flow D Mins Final Shut-in E Mins r i r, a 1 Hydrostatic Mud F Remark s: Shut in pressure did not reach sfotic reservoir pressure. Clock Travel inches per m in. PRESSURE INCREMENTS . Point Minutes Pressure T + At Point T + At Nt Minutes Pressure At Point Minutes Pressure T + At \t 0 32 214.7 PO 1 NTS 19 144. 41 224.9 1 150.1 1 44 . ' 3d 234. 2 8.8 25 145.0J 38 I 242.0 3 14.5 30 145. 14 40' 242. 4 147.2 35i 145.0 42 5 150.6 40 145.0 44 221.0 6 ' 31.0 45 145.0 21 0. 7 147.8 50 145.0 201 .1 8 160.8 55 I . 15 194.3 9 109.8 14l . rj? 224.4 10 88.2 145. 257.8 11 145.0 70 14 . ■ 279.4 12 172.2 14 . 58 304.9 13 157.4 145.d 60 311.2 14 242.0 li ' . 12.9 15 194.3 11 145. 313.4 15 313.4 2 1- . 111 66 313.4 17 227.2 4 H- . • 290.2 18 146.7 163.7 274. I 8 166.5 260.1 10 168.8 74 ■ . 12 1 76 . 14 172.? 1 7 77 227.2 . 12 16 r J 72. 2 20 22 24 16< . li • T. • " B-336 26 1 7 ■ • 30 202.3. Page 4 JOHNSTON i .found a bett3r way PRESSURE DATA ^^ Instrument No. J-405 ^Capacity (P.S.I.G.) 2800 Field Report No. 04362 C Instrument Depth 79 5 ■ Instrument Opening OUTS 1 OE TIME DATA Time Given Time Computed Pressure Grodient P. S.I. /Ft. V/ell Temperature F. 80 Initial Hydrostatic Mud A Initial Shut-in B Mins • Mins. Initial F low C Mins Mins. Mins. Mins Mins Mins. Final F low D Mins Mins. Mins. Final Shut-in E Mins Final Hydrostatic Mud F Remark s: Shut in pressure did not reach stati c reservoir pressure. Clock Travel 0. 02Q4_2 inches per mm. PRESSURE INCREMENTS Point Minutes Pressure T + \t Point T + At Point T+ \t t : Minutes Pressure At Minutes Pressure At j 0 0' 28.8 1 22 156.7 221 123.9 161. 23 t 157.3 123.9 161.3 ! 24 I >157. 26' 123.9 161 . 25i 157. 28 ' 3.9 161 . ■ '. 30 123.3 161 . 27 157. 32 123.3 161.3 157.9 34 123.3 .. 161.3 157.9 36 123.3 40 161.3 30 158.4 38 123.3 4 45 161 . 159.0 I 40 123.3 6 01 45. 159.6 42 123.3 1 63.3 90 159.6 9 44 123.3 3 79.7 11 159.6 46 105.8 98.4 ■ 159.6 103.0 4 113.1 I • 159.6 1 0 103.0 _5_ 6 122 . 170 160.1 1 125.6 12 . 190 160.7 2 138.0 7 13' . 210 160.7 3 143.1 14S . 230 161.3 4 146.5 10 11 14: . 7 243 161.3 5 149.4 14- . 7 0 161.3 6 151.6 150.', 8 1 175.4 71 152.8 1? 152. 2 143.7 8 153.9 • 153. 4 127.3 9 154.5 * 14 15: . I 125.6 10 155.6 # 15! .1 8 12 .1 11 15! .1 • 15! . 10 12 . 12 1 6.2 17 ' .? 12 125.0 1 1 B-337 156.7 1 19 156. 14 124.5 14 156.7 " .7 16 124. r. 15 156. ■ . 1 1 ..'- 11 17 1 . ' 21 156.7 20 123. 156.7 " Page 5 . - ...found a batter \.\ / PRESSURE DATA ^B Instrument No. J-405 Fiel T eopacit y (P.S.I.G.) • d Report No. 04362 C Instrument Depth Instrument Opening TIME DATA ime Given Time Computed Pressure Grodient P. S.I. /Ft. Vi'ell Temperature F Initial Hydrostatic Mi jd A Initiol Shut* in B Min s . Mins. Initial F low C Mins Min«; i Mins Mins. Mins Min*. F inol F low D Mins . ] Min<;. F ina 1 Shut-in E Mins . I Mins. Final Hydrostatic Mu d F Remork s: Shut in pressure did noi reach sfofi C reservoir pressure. Clock Travel inches per min. PRESSURE INCREMENTS - Point Minutes Pressure T • \ t Point T + \ t t Minutes Pressure \t Point Minutes T - \t Pressure \ t W 18; 1 56 . 7 32 220.7 PO 1 NTS 19! 156.7 1.4 1 165.2 20 156.7 ).5 2 26.0 25 1 157.3 251 . 3 28.8 30 157.9 14 4C 4 161.3 35! 158.4 42 240.5 5 165.2 40l 159.0 44 228.6 6 ' 45.2 45! 159.6 21 3.4 7 161.3 50 159.6 48 209.9 8 175.4 55 159.6 1 ■, 9 123.3 ■ 159.6 52 246.7 10 103.0 ■ 159.6 276.1 11 159.6 70 159.6 56 296.5 12 185.6 75 159.6 58 316.3 13 171.4 80 159. ».n 1 .4 14 251.8 11 83 159.6 62 322.6 15 206.5 11 159.6 323.1 16 3.1 2 167. 16 66 323.1 17 3.4 4 173.1 68 . 18 157.9 6 177.1 70 282.9 8 179.9 72 269.4 10 182.2 74 257.5 1? 183.9 76 6.7 14 185.6 17 77 239.4 A 16 185.6 # 181 .1 1 7> . 173.1 II B-338 • 24 1 71 . 4 1 2.2 191 . • l.~4 . rrji «# V»' » fc I ** ^ ...found a better way GUIDE TO IDENTIFICATION OF DRILL STEM TEST PRESSURE CHARTS JOHNSTON FIELD REPORTS REPORT NO. RECORDER NO. CAPACITY REQJESTEO A. Initial Hyd. Mud B. Initial Shut-in C. Initial Flow D. Final Flow E. Final Shut-in F. Final Hyd. Mud The following points are either fluctuating pressures or points indicating other packer settings, (testing different zones). A-l, A-2, A-3, etc. Initial Hyd. Pressures B-l, B-2, B-3, etc. Subsequent Shut-in Pressures C-l, C-2, C-3, etc. Flowing Pressures D-l, D-2, D-3, etc. Subsequent Final Flow Pressures E-l, E-2, E-3, etc. Subsequent Final Shut-in Pressures F-l, F-2, F-3. etc. Final Hyd. Mud Pressures Z — Special pressure points such as pumping pressure recorded for formation breakdown. TLD ...found s better way GUIDE TO IDENTIFICATION OF DRILL STEM TEST PRESSURE CHARTS JOHPJSTOM FIELO REPORTS REPORT NO. RECORDER NO. CAPACITY REQUESTED / C-l X A. Initial Hyd. Mud B. Initial Shut-in C. Initial Flow D. Final Flow E. Final Shut-in F. Final Hyd. Mud The following points are either fluctuating pressures or points indicating other packer settings, (testing different zones). A-l, A-2, A-3, etc. Initial Hyd. Pressures B-l, B-2, B-3, etc. Subsequent Shut-in Pressures C-l, C-2, C-3, etc. Flowing Pressures D-l, D-2, D-3, etc. Subsequent Final Flow Pressures E-l, E-2, E-3, etc. Subsequent Final Shut-in Pressures F-l. F-2, F-3, etc. Final Hyd. Mud Pressures Z — Special pressure points such as pumping pressure recorded for formation breakdown. 1 V 1 1 . , > J I ■ k II B-341 F.R. // 04363 C . 0Sb3 CO 30 / Q09O * r e ' 1 *o S Q ' ld Rcpnrt Nn, 04363 C ^ Copocity (P.S.I.G.) 2800 Instrument Depth 805* TIME DATA Time Given Time Computed Mins. Min s. Instrument Opening 1 NS 1 DE Pressure Grodient P. S.I. /Ft. Well Temperature F. 82 Initial Hydrostatic Mud A Initial Shut-in B Initial F low C Min s. Mins. Mins. Min*. Mins.. Mins. Mins. Fina 1 F low D Mins. F ino 1 Shut-in E Mins. Mins. Final Hydrostatic Mud F Remarks: i . 'Shut in pressure did not reocri stoti c reservoir pressure. Clock Travel inches per min. PRESSURE INCREMENTS Point Minutes Pressure T + \t Point t Minutes Pressure T + At At Point Minutes j Pressure T + At At ▼ ' 1 i.O 142.6 1 54.0 : 3 152.9 I 19 143.8 95 154.6 6 152.9 J 20 144.9 100 155.7 9 152.9 _2L 145.5 105 158.0 12 152.9 22 146.0 110 158.0 15 152.9 23 146.6 115 158.0 18 152.9 24 147.2 120 158.0 ZL 152.9 25 147.8 125 158.5 24 152.9 26 148.3 130 158.5 27 152.9 27 148.9 135 159.1 30 152.9 28 149.5 140 159.1 33 152.9 29 149.5 145 159.7 _3& 152.9 30 150.0 150 159.7 A 38 152.9 -1 150.0 155 159.7 0 30.9 32 150.6 160 159.7 _L 42.3 33 150.6 165 159.7 _a 54.8 34 151 .2 1 70 159.7 _3_ 66.1 35 151 .2 175 159.7 4 78.6 36 151.2 180 159.7 - 90.5 37 151.2 185 159.7 99.6 38 151.7 190 159.7 106.9 39 151 .7 195 159.7 8 112.6 40 151 .7 200 159.7 9 117.7 45 152.3 205 159.7 A 10 122.8 152.9 31 0 159.7 # 126.8 152.9 215, 1! '.7 12 1 ■ . 1' 3.4 7 216 159. ' 13 .1 153. ; 8 1 1 !i 14 i « .•; I I W-sAA 3 141 • L5 138.7 I 1 . ~ -'-1 -r •; 14 . 16 140.4 154. E 14' . 17 141 .5 154.0 8 141 .5 i Page 3 vera ..found a better way PRESSURE DATA 1 1 ■.irumenl No. city (P.S.I.G.) Iiiilrument Depth i, itrumenl Opening^ ! , ...,jre Gradient P. S.I. /Ft. r, -II Temperature F_. Initial Hydro staticMud Initial Shut-in Initial F low F mal F low T mal Shut-in f mal Hydrostatic Mud Remark s: J -029 CONTI NUED Field Report No. 04363 C TIME DATA Time G i ven Time Computed .Mins. . M i n s . Mins. . Mm s. Mins. Mins. _ M i n s . Mins. Mins. Mins. Mins. Mins. S/iut in pressure did not reach static reservoir pressure. Clock Travel inches per min. PRESSURE INCREMENTS Poir M i n u t Pressure T + At At Point Minutes Pressure T i \t Point Minutes Pre T + Ai A, 10 40.9 14 149. 90 156.3 11.5 TT 10.9 15! 149.5* 16' 149.5 95 156.8 100 156.8 1 10.9 17 149.5 105 156.8 10.9 10.9 10.9 10.9 1 149.5 19 150.0 20 21 152.3 1 52 . 12 1 07 156.8 169.3 177.2 T89.6' 26 10.9 10.9 10.9 22 152.3 23 24 152.3 152.3 191 .4 10 196.5 12 199.3 10.9 10.9 25 21 152.3 155.1 13 14 1» 199.3 192.0 10.9 27 155.1 186.9 10.9 10.9 10.9 • 10.9 80.8 03.5 12.0 18.3 24.5 1 2 |. I 33.0 36.4 -11 .') i \.2 44.9 47.8 2n 29 155.1 155.1 30 155.1 J! 32 155.1 33 155.1 155.1 34 155.1 35 155.1 40 155.1 4l. 50 155.1 155.7 55 60 65 70 i0 1- ,.7 1 55/7 1_56_. . 156. 20 182.9 14 22 181.2 24 26 204.5 222 . 28 237.3 30 250.4 32 34 -.4 27S. 3 36 285.5 15 37 II B-345 16 1 . 1 ■ . 3* 40 42 44 47 ■.-■ 278. 1 26( . 254 . i.7 237.3 /.3 274. c Page 4 [ . - - JO- TOM ... found a batier way PRESSURE DATA . Ft. • Mud J-029 CONT I NUED Field Report No. 04363 C TIME DATA Time Given Time Computed . Mins. Mins. Mins. Mins. Mins. Mins. Mins. Mins. Mins. . Mins. Mins. Mins. n 3f reach stolic reservoir presiuic. Clock Travel i nches per m in . PRESSURE INCREMENTS • i kurc T + At Point T-t \t Point T+At it Minutes Pressure \t Minutes Pressure ' At .2 PO 1 MTS 1 149.5' .7 2 6.0 4.9 3 19.0 .6 4 .. 152.9 !■ .6 5 158.0 6 30.9 1.7 7 159.7 7.2 8 180.6 9 140.9 4.0 10 110.9 11 80.8 ■17.0 12 156.8 . / 13 199.3 •■7.0 14 181 .2 . 15 285.5 16 237.3 i.9 17 336.6 In 247.0 19 165.9 . II B-346 1 i Page 5 JOHft!ST0ftJ ...found a beti3r way ' PRESSURE DATA f Jfe Instrument Ko. J-405 Field Report No. TIME Time Given Mins. 04363 C ^ Copocity (P.S.I.G.) • 2800 Instrument IVpth 850' DATA Time Computed j Mins. i Mins. Mins. Mins. Mins. Instrument Opening OUTS I DE Pressure Gradient P. S.I. /Ft. Well Temperature UF. 82 Initial Hydrostatic Mud A Initial Shut-in B Ini 1 io I F low C Mins. Mins. Mins. Final Flow D Mins. Final Shut-in E Mins. I Mins. Final Hydrostatic Mud F Remark s: Shut in pressure did not reach static reservoir pressure. Clock Travel inches per min. PRESSURE INCREMENTS Point Minutes Pressure T + A Al t Point Minutes Pressure T + At At Point Minutes Pressure T+ \t A, P o 28.8 1 164.6 90 174.3 3 175.3 19 165.2 95 174.8 6 175.3 20 166.3 100 175.3 9 1 75. 3 21 166.9 105 175.3 12 175.3 22 167.4 110 175.3 15 175.3 23 168.6 115 175.3 18 175.3 24 169.1 120 175.9 21 175.3 25 169.7 125 175.9 24 175.3 2- 169.7 130 175.9 27 175.3 27 170.2 135 175.9 175. 28 170.2 140 176.5 175.3 29 170.8 145 176.5 175.3 30 171 .4 150 176.5 4 38 175.3 31 171.4 155 177.0 0 53.7 32 171.4 160 177.0 1 75.8 33 171.4 165 177.0 ?. 86.5 34 171.9 1 70 177.0 3 99. 35 171.9 175 177.6 4 111. I 36 172.5 no 177.6 5 12i 37 172.5 185 179.3 ■ 7 8 127.2 1 32. 1 1 3 1.6 172.5 190 179.9 39 172.5 195 181 .6 40 172.5 200 181 .6 1 9 12 13 14 lf> 1f> $.7 14 . T.r.'i ■ . . '■1.2 45 173.1 205 181 .6 50 173.6 210 181.6 55 174.2 215 181 .6 60 174.2 7 216 1 1 .6 1 74.2 I l d 3 1 7 8 1 201.4 70 1 74.2 2 169. 75 . 4 16.",. 174.2 • 11 . 174.8 8 r.O Page 6 - ■ - - - . . found b better nay I PRESSURE DATA A Instrument No. J-405 CONTINUED Fiel T ^Copocity (P.S.I.G.) d Report No. - 04363 C Instrument Depth Instrument Opening TIME DATA me Given Time Computed Pressure Gradient P. S.I. /Ft. Well Temperature F. Initial Hydrostatic Mud A Initial Shut-in B Mins Mins. Initial F low C Mins Mins Mins Mins. Mins Mins. Fina 1 F low D Mins Mins. Mins. Final Shut-in E Mins Finol Hydrostatic Mud F Rcmork s: 'Shut in pressure did not reach static reservoir pressure. Clock Travel inches per min. PRESSURE INCREMENTS r Point Minutes Pressure ft T + At Point T + At Point \t Minutes Pressure \t Minutes T + At Pressure \ t • ' 14 1.0 90 175.3 12! 133.5 1 168.6- 95 175.3 I4j 132.9 1 70. 2 100 175.9 16 132. 17 1 70. 2 ! 105 175.9 1 ■ 133. 1 170.2 12 1 07 175.9 133. 1 170.8 2 187.2 22 133. 20 ■ - . 4 196.3 24 133. 21 175.3 6 203.6 26 133.5 22 175.3 8 209.9 28 133.5 23 175.3 10 ■ 215.5 1 33 . 175.3 12 218.9 i 32 133. 173. 13 14 218.9 34 133.5 26 175.3 16 214.9 ] 36 ■ . ■ 27 175.3 18 209.9 38 132. • 281 175.3 205.3 ' 1 33 . 175. 14 203.1 42 132. 30 175. 4.0 10 44 133. 31 175.3 241 . 5 1 11 46 102.9 32 175.3 28 257.4 1 125. 33 175.3 30 271.5 2 1 32. ■ 34 17' . 32 284.0 3 139.7 35 175.3 34 295.3 4 145.4 40 175. 36 305.5 1 50. A 45 175. 15 305.5 * 154.4 50 1 ' . ■; i. '.4 $ 157.2 17' . 40 .! 160.1 1 75. 3 II B-^48 ^- 27* - ■ 162. " . 44 . 10 164.0 70 1 75.3 46 . 11 164.6 7 • 16 47 257. • 1? 165. / ' 175. ■; 13 166.8 1 75.3 .1 Page 7 - ■ J. . OriluS l Oi-J ...found a better woy PRESSURE DATA Ain'.lrument No. J-405 COrjTI NUED Fi.u R.p.rt u„ 04363 C "Copacty (P.S.I.G.) In'.trumcnt Depth TIME DATA Time Given Time Computed Instrument Opening Pressure Gradient P. S.I. /Ft. Wrll Temperature F. Initial Hydrostotic Mud A Initial Shut-in B Mins. Mins. Initial Flow C Min s. M i n «; . Mins. Mins. Mins. Mins. Final F low D Mins. Mins. Final Shut'in E Mins. Mins. Final Hydrostatic Mud F Remarks: * Shut in pressure did no' rcoch stati c reservoir pressure. Clock Travel inches per min. PRESSURE INCREMENTS Point T + At Point T+ \t Point T + At Minutes Pressure At Minutes Pressure \t Minutes ; Pressure \t '§T 340. 6 po ii 351 . 3 1 172.5 _56J 532.4 2 > 28.8 I 68 353.6 3 28. 60 354.7 4 175. ■ • 62 1 354.7 5 180.4 64 336.6 6 53.7 66 322.4 7 181.6 68 303.9 8 201 . 4 70, : •:. 9 163.5 72 28< . 10 132.9 74 27' .1 11 102.9 ■ 268.7 12 175.9 190.1 1 - 218.9 80 188.9 14 203.1 84 188. 15 305.5 187. 16 257.9 19 187.8 17 354.7 18 268.7 19 119.8 $ ll B-349 I J - ...found a better way GUIDE TO IDENTIFICATION OF DRILL STEM TEST PRESSURE CHARTS j- .; .tc;; FIELD . REPORTS REPORT NO. RECORDER NO. CAPACITY REQUESTED A. Initial Hyd. Mud B. Initial Shut-in C. Initial Flow D. Final Flow E. Final Shut-in F. Final Hyd. Mud T/ie following points are either fluctuating pressures or points indicating other packer settings, (testing different zones). A-l, A-2, A-3, etc. Initial Hyd. Pressures B-l, B-2, B-3, etc. Subsequent Shut-in Pressures C-l, C-2, C-3, etc. Flowing Pressures D-l, D-2, D-3, etc. Subsequent Final Flow Pressures E-l, E-2, E-3, etc. Subsequent Final Shut-in Pressures F-l, F-2, F-3, etc. Final Hyd. Mud Pressures Z — Special pressure points such as pumping pressure recorded for formation breakdown. /-* ».»-.- ' I 1 - '. : J -: t ', - i ! . » i |IB l. -. rr— ri - . * -i FIELD REPORT NO. RECOROER NO. cm JOHNSTON . J •~3 . 1 04363 C CAPACITY J-029 REPORTS REQUESTED * • ■ 1 1 2800# — __. (./ ■ - J. w- / 5+ * 1 v. •• --r.TK^KRirT"*" o a s r ■i / ' r r , \ * i i i i t i. i > * 1 1 j . ~XTr^rr 3 SO m \ . L -' - ...found a better way GUIDE TO IDENTIFICATION OF DRILL STEM TEST PRESSURE CHARTS JOHNSTON FIELD REPORTS REPORT NO. RECORDER NO. CAPACITY REQUESTED / C-l A. Initial Hyd. Mud B. Initial Shut-in C. Initial Flow D. Final Flow E. Final Shut-in F. Final Hyd. Mud The following points are cither fluctuating pressures or points indicating other packer settings, (testing different zones). A-l, A-2, A-3, etc. Initial Hyd. Pressures B-l, B-2, B-3, etc. Subsequent Shut-in Pressures C-l, C-2, C-3, etc. Flowing Pressures D-l, D-2, D-3, etc. Subsequent Final Flow Pressures E-l, E-2, E-3, etc. Subsequent Final Shut-in Pressures F-l, F-2, F-3. etc. Final Hyd. Mud Pressures Z — Special pressure points such as pumping pressure recorded for formation breakdown. — • '■.'■JL.'.J.'.'J.si'J ". . ii"tl^JJMiJJL'.iJlfWt4R!Wl'W|WCTUJ>.«.>^ .Ji'Wiwi^w ■■ ■■ i u ■»!■■»■■ FIELD REPORT NO. 04363 C CAPACITY 2800# RECORDER NO. J -405 REPORTS REQUESTED -» y 5+ • -.--* >V X f .■ y \ < <. • i * - \ s ■■■- '•--..-. v ll B-351 JOHSSSSTC i c s t - . -> r • H " ^ u s . . Jit y u 1 I B-352 F.R. //Q4364 C POPO -■ e cm 1 I IT B-353 Page 1 JOHNSTON . . . found a bettor way SURFACE INFORMATION •cription (Rote of Flow) Opened Tool Time 1821 Pressure (P.S.I.G.) Surface Choice L IGHT BLOW ( 1 1- 12-74) CLOSED FOR INITIAL SHUT-IN 1829 F IN ISHED SHUT- 1 N 1859 - - RE-OPENED TOOL 1911 - - L IGHT BLOW JETTED WATER FROM 2322 - - (11-13-74) TO 0022 - - WATER INJECT ION 5 GAL/MIN FOR 15 MIN. FROM 0107 - _ TO 0122 _ — 10 MINUTE DECL INE 10 GAL/MIN FOR 15 MIN. FROM 0133 TO 0148 - 10 M INUTE DECL I NE 20 GAL/MIN FOR 15 MIN. FROM 0158 - - TO 0213 _ - 10 M INUTE DECL 1 NE 20 gal/min for 6 min., cut BACK TO 10 GAl/mIN FOR 9 MINUTES FROM 0223 - - TO 0238 - - 10 M INUTE DECL I NE PULLED PACKER LOOSE 0251 - - | W Cushion Typo Amount Pressure Bottom Choke «.. 3/4" MUD DATA Mud Type ~ Wt. Water Lo » r r Prmtt of Mud ~ © 7 *F; of Filtrate © °F Chlorido Content PPM EQUIPMENT & HOLE DATA M.F.E. OPEN HOLE Formation Tested PARACHUTE CREEK Elevation 7036 F« Net Productive Intervol - Ft. Estimated Porosity 20 % All Depths Measured From GROUND LEVEL Total Depth 919 Ft Moin Hole/Casing Size 6 3/4" Rat Hole/liner Sire _. Drill Collar length Drill Pipe length __ Packer Depth(i) 327' i.o. 2 1/8" 506 ID. 2 5/8" 863 & 866 Ft MULTI-FLOW EVALUATCR FLUID SAMPLE DATA Sampler Pressure Recovery: Cu. Ft. Gas cc. Oil cc. Water cc. Mud Tot. liquid cc. Gravity P.S.I.G. at Surface API ,. °F. Gai/Oil Ratio. ft./bbl. Recovery Water Recovery Mud Recovery Mud Filtrate Mud Pit Sample Mud Pit Sample Filtrate RESISTIVITY @ @ _ CMICRIDE CONTENT @ @ ppm ppm ppm WATER RECOVERY DESCRIPTION FEET 374.1 BARRELS 1.75 % OIL % WATER % OTHERS API GRAVITY @ °F. RESISTIVITY @ °F. — — — — -■ CHI. PPM @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. Rcmorksi 1500 SECURITY LIFE BUILDING; 1616 glenarm; Denver, Colorado 80202 Mipany Will ATLANTIC RICHFIELD COMPANY FEDERAL 5-G //17 ,. ., SORAGUM GULCH B-354 ' Location SEC.16-3S-9 Test Interval 866' TO 919' I I Test # ' 4 11-12-74 ■ l' R 10 BLANCO State COLORADO T«hn«ion M '( VERNAL ) Test Approved By MR^ JERRY L. BUSSELI Field Report No. 04364 C No. Roporti Requested _ 4^1 OXS ) Page 2 I > JOKftSSTOiM ...found a hotter way ' PRESSURE DATA m Instrument No. J-029 W Copacity (P.S.I.G.) 2800 Field Report No. 04364 C Instrument Depth 850' Instrument Opening INS IDE TIME DATA Time Given Time Computed Pressure Gradient P. S.I. /Ft. Well Temperature F. 86 Initial Hydrostatic Mi ;d A Initial Shut-in B Mins Min s. Initiol Flow C Mins Mins . Mins Mins. Mins Mins. Final F low D Mins Mins. Final Shut-in E Mins Mins. Final Hydrostatic Mu d F Remark s: 1 * Shut in pressure did r>< >» reach sfafi c reservoir pressure ClockTravel inchespermin. PRESSURE INCREMENTS PO 1 NTS Point Minutos Pressure T + \t Point T + \t Point T + At t Minutos Pressure \t Minutes Pressure j \t f 1 183.9 0 1 11.7 16! 131.2 i 10.0 • 176.5 • | 17 135.2 3 11.7 6 177.7 16 138.6 4 178.8 9 177.7 19 141.4 5 183. • 177.7 20 144.3 6 22./- 15 177.7 21 146.5 7 183.9 177.7 22 149.3 8 199.8 21 23 151.6 9 118.8 24 178.2 24 152.7 10 96.1 27 178.8 25 154.4 11 176.5 I 30 178.8 2e 155.0 1 229.2 33 178.8 27 156.1 215.1 36 178.8 28 157.3 14 318.8 4 39 178.8 29 159.0 '280. • 30 160.1 352.8 6 0 22.4 31 160.7 17 308. 1 29.8 32 161.8 364.7 2 40.6 33 162.4 1 1 304.0 3 50.2 34 163.5 20 187.9 4 59.3 35 164.1 5 66.6 36 165.2 6 74.0 37 165.8 7 81.4 38 166.3 8 88.7 39 166.9 | 9 97.2 40 167.5 f 10 10 -. 41J 168.0 ! 11 109. 1 4? II .1 12 114.8 11 B-355 II . 11 1. 44 . 14 i; . ■ i.3 127. • . ' < ON r 1 NU! D CON T INUfD Page 3 — G I - ■ - - ...found a batter wcy PRESSURE DATA ^. Instrument No. J- 029 ' Capacity (P.S.I.G.) F ield Report No. 04364 C Instrument Depth Instrument Opening TIME DATA Time Given Time Computed Pressure Gradient P. S.I. /Ft. Well Temperature F. Initial Hydrostatic Mi ,d A Initial Shut»in B Min s Mins. Initio 1 F low C Min* Min* . Mins Mins. Min*. Mins. Mins Final F low D Mins T inc 1 Shut-in E Mins Mins. Final Hydrostatic Mu d F Remark s : 1 'Shut in pressure did not reach sfotic reservoir pressure. ClockTrovel inches per min, PRESSURE INCREMENTS Point Minutes Pressure T+ \t Point T+At Point T + At At: Minutes Pressure At Minutes Pressure At i * 47 1 170.9 1 l!8 1 199. 8 1 | 113.1 48 171.4 2 137. 5 2 119.3 49 171.4 4 ► 123. 9 3 124.4 50 172.0 6 122. 2 4 129.5 51 172.6 8 119. 3 | 5 132.4 52 172.6 10 119. 3 6 136.9 53 173.1 12 119. 3 1 7 140.9 5J_ 173.1 14 119. 3 8 144.3 55 173.7 16 118 .8 9. 146.5 56 173.7 18 118. 8 10 148.8 57 173.7 20 118. 8 11 150.5 58 174.3 22 118. 8 12 152.7 59 174.8 24 118 .8 13 153.9 60 174.8 26 118 .8 14 155.0 70 176.0 28 118. 8 15 155.6 80 176.5 30 118 ,8 16 156.1 90 100 177.1 32 118 2 17 157.3 177.1 34 1 1 8 .2 18 158.4 110 177.1 36 118 2 19 159.0 120 177.1 38 lit 8 20 160.1 130 177.1 40 118 8 21 160.7 140 177.1 a:- ne .8 22 161.8 II 0 177.1 44 118 .8 23 162.9 177.1 46 118 .8 24 164.1 I 177.7 48 118 .8 25 164.6 # 180 177.7 50 118 .8 26 165.2 . 1 118 II B-356 166.3 ?00 1.9 118 . . 1 210 . 9 1 1 8 29 .5 . H 1 . 1 ' . 10 96 1 11 l. 1 7 UCV) C or IT INUEO CON T 1 N U E 0 % Page 4 u . r i : JOHNSTON ...found s tetter way I PRESSURE DATA '"^ Instrument No. J- 029 * Capacity (P.S.I.G.) . Field Report No. 04364 C Instrument Depth Instrument Opening TIME DATA Time Given Time Computed Pressure Gradient P. S.I. /Ft. Well Temperature ' F. Initial Hydrostatic Mud A Initial Shut-in B M ins. ins. ins. ins. ins. ins. Mins. Initial Flow C M Min«i M Mins. M Mins. Final Flow D M Min<;. Final Shut-in E M Mins. Final Hydrostatic Mud F Remark s: Shut in pressure did not reach sfofic reservoir pressure. Clock Travel inches per min. PRESSURE INCREMENTS Point Minutes Pressure T + A. At Point t Minutes Pressure T + At Point >t Minutes J Pressure T + At \t f 3?- 170.3 42 ! 304.6 33 170.9 44 295.5 34 170.9 46 287.0 35 170.9 ill 5 48 280.8 40 172.6 50 314.8 45 174.3 52 343.1 50 175.4 54 350.5 55 176.5 56 350.5 11 57 176.5 56 350.5 2 187.9 60 350.5 196.9 62 352.8 204.9 16 63 352.8 213.4 64 350.5 f 10 219.6 66 339.2 12 225.3 68 328.4 14 1( 229.2 70 318.2 1 229.2 17 72 308.0 j 12 17 229.2 M 327.8 18 226.4 76 349.9 20 221.9 78 3. ) 84 363.5 248.5 86 364.7 . 266.1 18 87 364.7 9 :.-■■ 88 3.5 B-357 34 . 353.9 II I 308.0 '.0 . . 331.2 14 40 . 91 321.0 ! 1 4 . 312.0 CONT INUED 19 99 304.0 • Page 5 ...found a better way PRESSURE DATA Instrument No. Capacity (P.S.I.G.) Instrument Depth Instrument Opening Pressure Gradient P. 5. 1. /Ft. Well Tempercture F. Initial Hydrostatic Mud Initial Shut-in Initial Flow Final F low Final Shut-in Final Hydrostatic Mud J-405 2800 884 OUTS IDE 86 Field Report- No. 04364 C TIME DATA Time G i Time Computed . Mins. Mins. Mins. . Mins. Mins. Mins. Mins. .Mins. .Mins. .Mins. .Mins. Mins. Remark s: *Shi/t in pressure did not reoch static reservoir pressure. Clock Travel inch es per mm. PRESSURE INCREMENTS '0 i f:ii Point Minutes T • \i Point Minutes T + -\i Point Minutes , Pressure T 4 \i ft ! 1 1 200.7 28.8 16 147.5 2 26.0 3 192.7 17 151.5 3 28.8 v 193.9 18 154.9 4 194.4 9 194.4 19 157.7 5 202.4 12 194.4 20 160.5 6 41.8 15 194.4 21 162.8 7 200.7 18 194.4 22 165.6 8 217.1 21 194.4 23 167.3 9 136.8 24 1 . v . • • 24" 169.0 10 113.0 27 194.4 25 170.1 11 190.5 30 194.4 26 171.3 1? 244.2 33 194.4 27 172.4 li 13 232.3 36 194.4 28 173.5 14 334.1 .■ 4 39 194.4 29 174.7 15 297.3 30 175.8 16 368.0 6 0 41.8 31 176.4 17 '3.9 1 46.9 32 177.5 18 9.3 2 58.2 33 178.0 19 320.5 3 68.4 34 178.6 20 205.8 4 76.8 35 179.7 5 84.2 36 180.3 6 90.4 37 180.9 7 98.3 38 181.4 8 105.7 39 182.0 h 9 113.6 40 182.6 f 10 120.4 41 .1 11 126.6 IT B-^R 42 18:-;. l 12 i n.7 4 3 183.7 ■ 1 13 1 J5.6 44 18 . 14 1 19.6 45 i 4.3 15 143.6 46 184.3 COI JT IMUED CONT 1 NUf.D • Page 6 , . . found b batter v.' ay PRESSURE DATA ""^ Instrument No. J- 405 " Capocity (P.S.I.G.) . Field Report No. 04364 C Instrument Depth In •_. trur, , »nl Opening TIME DATA Time Given Time Computed Pressure Gradient P. S.I. /Ft. Well Temperature F. Initial Hydrostatic Mud A Initial Shut-in B Mins. Mins. Initio 1 F low C Mins Mins, Mins Mins. Mins Mins. F ino 1 F low D Mins Mins. Finol Shut'in E Mins Mins. Final Hydrostatic Mud F Remark s: . Shut in pressure did not reach sfofic reservoir pressure. Clock Travel inches per min. PRESSURE INCREMENTS Point Minutes Pressure T + Al Point T + At Point W Minutes Pressure u Minutes Pressure T + At At t 184.8 8 ] 217.1 1 130.0 184.8 \0 2 136.2 49 | 185.4 4j 142.4 3 141.3 50 186.0 6 140.7 4 145.3 51 186.5 8 137.9 5 149.2 _52 186.5 101 137.9 6 153.7 53 187.1 l 1 37 . 9 7 . 157.1 5j4_ 187.1 1 4 | 1 37 . 3 8 160.0 55 187.7 16 136.8 9 162.2 56 188.2 18 137.3 10 163.9 57 188.8 20 137.3 11 166.7 58 188.8 22 137.3 12 167.9 ' • 189.4 24 137.3 13 169.0 • 189.4 26 137.3 14 170.1 70 191.1 28 136.8 15 170.7 191.1 30 136.8 16 171.8 192.2 32 136.8 17 172.4 100 192.2 34 136.8 18 173.0 192.2 36 136.8 19 174.1 120 192.2 38 136.8 20 174.7 130 192.2 40 136.8 21 175.8 . 140 192.2 42 136.8 22 176.4 150 192.2 44 136.8 23 177.5 192.2 46 136.8 24 178.0 1 • 170 192.2 ■ 136.8 25 178.6 1 19: . 50 136.8 26 1 179.7 . • 5; 136.1 i i n- ^Q < J. 3 1 )! . i Jl . 28 . I '! ! ' . i 3 . ; i 1 b l . A '.5 5( 113.6 30 . 7 • 10 ■ 113.0 .1 200.7 CO.'h INUCD i 1, CON T IMUED Page 7 • - U -ij- JUnl . ... i _ ...found a Leilor way 1 i ••* PRESSURE DATA y Instrument No. . J-405 Capacity (P.S.I.G.) Field Report No. 04364 C Instrument Depth Instrument Opening TIME DATA Time Given Time Computed Pressure Gradient P. S.I. /Ft. Well Temperature F. Initial Hydrostatic Mi A A Initial Shut-in B M ins. ins. ins. ins. ins. ins. Mins. Initial Flow C M Mins. M Mins. M Min^. Final Flow 0 M Mins. Mins. Final Shut-in E M Final Hydrostatic Mu d F Remark s: Shut in pressure did not reach slati c reservoir pressure. Clock Trrvel inches per min. PRESSURE INCREMENTS Point ^Minutes Pressure T 3 At Point t Minutes T + \ t Point Pressure \t Minutes T • \; Pressure A| 32 3.1 42 318.3 33 1 3.7 44 309.2 34 4.3 46 300.7 35 184.8 15 48 297.3 40 188.2 334 . 45 189.9 52 4.6 50 190.5 54 . 55 190.5 56 i. 11 57 190.5 58 . ' 2 201.8 GO . 4 211.4 62 368.0 6 220.5 16 368.0 8 227.8 64 ■• '.4 10 235.2 6^ 351.6 12 . 68 340.9 14 •' .I 70 331.8 16 4.2 17 72 323.9 17 4.2 74 351.1 18 242.5 76 369.7 20 238.0 78 374.2 22 4.0 80 375.9 24 .3 82 377.1 2.7 84 378.8 . 28 270.2 86 . 1 30 . 18 87 9.3 32 |. 30i. ■ . 34 314.3 . . 1 5.0 I I B-^dO - 38 334.1 94 344. 1 4 3.9 334.1 5.2 . . r.or t ir:urn 19 0.5 |"j- f ...found a better way GUIDE TO IDENTIFICATION OF DRILL STEM TEST PRESSURE CHARTS ■-~. i jc:;rJ3Torj FIELD REPORT NO REPORTS RECORDER NO. CAPACITY REQUESTED A. Initial Hyd. Mud B. Initial Shut-in C. Initial Flow D. Final Flow E. Final Shut-in F. Final Hyd. Mud The following points are either fluctuating pressures or points indicating other packer settings, (testing d/!/erent zones). A-l, A-2, A-3, etc. Initial Hyd. Fressures B-l. B-2, B-3, etc. Subsequent Shut-in Pressures C-l, C-2, C-3, etc. Flowing Pressures D-l, D-2, D-3, etc. Subsequent Final Flow Pressures E-l, E-2, E-3, etc. Subsequent Final Shut-in Pressures F-l. F-2, F-3, etc. Final Hyd. Mud Pressures Z — Special pressure points such as pumping pressure recorded for formation breakdown. FT' i- • / V FIELD REPORT NO. 04364 C CAPACITY RECORDER NO. '£? J- 02 9 REPORTS REQUESTED 2800# 14+ \ / '\f' <■ > V II B-36] . . Q Johnston ...found a better way GUIDE TO IDENTIFICATION OF DRILL STEM TEST PRESSURE CHARTS : JOHNSTON FIELD • REPORTS REPORT NO. RECORDER NO. CAPACITY REQUESTED / C-l A. Initial Hyd. Mud B. Initial Shut-in C. Initial Flow D. Final Flow E. Final Shut-in F. Final Hyd. Mud The following points are either fluctuating pressures or points indicating other packer settings, (testing different zones). A-l, A-2, A-3, etc. Initial Hyd. Pressures B-l, B-2, B-3, etc. Subsequent Shut-in Pressures C-l, C-2, C-3, etc. Flowing Pressures D-l, D-2, D-3, etc. Subsequent Final Flow Pressures E-l, E-2, E-3. etc. Subsequent Final Shut-in Pressures F-l, F-2, F-3. etc. Final Hyd. Mud Pressures Z — Special pressure points such as pumping pressure recorded for formation breakdown. ^SO-fr - r FIELD REPORT NO. 04364 C CAPACITY RECORDER NO. J-405 REPORTS REOUESTED 28 W 14+ %- < \ •• - Y ' il,: ■ - i ! -s - . A I I I II B-362 »■■>., '''■>■.'-' ; ... ■ • , 0 o POST OFFICE BOX 36363 HOUSTON, TEXAS 77036 (713) 494-3021 j. a. Fouche November 21, 1974 President Mr. F. C. Witmer Atlantic Richfield Company 1500 Security Life Building Denver, Colorado 80202 Dear Sir: Enclosed is the original of our Precision Pressure Gauge Drill Stem Test job SPG-11210-A performed on your Federal SG-17 Well, Tract C-b, Piceance Creek Basin, Sorghum Gulch, Rio Blanco County, Colorado on November 14- 15, 1974. Test interval was 0-866 feet and 866 feet to 919 feet. Also enclosed is the chart for gauge No. 95 and No. 212 with Field Data Sheet. Distribution is also being made according to the attached mailing list. Thank you for this opportunity to be of service. Very truly yours, SPERRY-SUN Carl Kisinger , , Jr . J Manager Pressure Services CK:jg Enclosure 0" • I I B-363 ♦ JOB NUMBER DATE OF JC SPG-U210-A 11-12-74 TO 11-13-7 SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT PREPARED FOR ATLANTIC RICHFIELD COMPANY WELL NUMBER FEDERAL SG-17 FIELD/LEASE SORGHUM GULCH COUNTY/PARISH RIO BLANCO STATE COLORADO TYPE OF TEST DRILL STEM REFERENCE ELEV GROUND LEVEL ADDITIONAL INFORMATION USED GAUGE NO, 2 1 2 WITH 500 LBt ELEMENT GAUGE TEST DEPTH IS 907,27 FEET GROUND LEVEL REFERENCE IS 7036 FEET TESTED tibb FEET TO 919 FEET .< > H B-364 22 POINTS REPORTED THIS JOB PAGE 1 OF 2 PAGES ft JOB NUMBER SPG-U210-A GAUGE/RUN NUMBER 313 RUN NO, i DST NO, 4 DATE OF JO; U-i2«»74 TO 1 1-13-7 DATE OF RU ii-xe-7. > DELTA TIME 0,000 ,033 ,067 .100 .133 .167 ,200 .233 ,267 ,300 ,333 ,3t>7 ,400 ,433 ,467 ,500 ,533 ,567 ,600 ,633 ,667 ,700 SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPCRT PRESSURE CPSI) 17,819 1699021 174,673 178,654 179.165 179,432 179,455 179e548 179e559 179.582 179,617 179.640 179.664 179,687 ,699 c722 .733 ,745 ,745 .757 ,768 ,780 179 179 179 179 179 179 179 179 TIME DATE COMMENTS HR MIN 16 17 NOV 12,1974 INITIAL SHUTIN 18 19 NOV 12,1974 18 21 NOV 12,1^74 16 23 NOV 12, 1974 18 25 NOV 12, 1974 18 27 NOV 12,1974 18 29 NOV 12, 1974 18 31 NOV 12,1974 18 33 NOV 12,1974 18 35 NCV 12,1974 18 37 NOV 12, 1974 18 39 NOV 12, 1974 16 41 NCV 12, 1974 18 43 NCV 12, 1974 18 45 NCV 12, 1974 16 47 NOV 12, 1Q74 18 49 NOV 12, 1974 18 51 NOV 12, 1974 18 53 NOV 12, 1974 18 55 NOV 12,1974 18 57 NOV 12,1974 18 59 NOV 12, 1974 END SHUT-IN II 15-365 22 POINTS REPORTED THI3 RUN PAGE 2 JOB NUMBER 3PG-11210»A GAUGE/RUN NUMBER 212 RUN NQ, 1 DST NO, a il«12-74 SPERRY«SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT. DATE OF JO TO 1 1-13*7 \ DATE OF RUi 11-18-7. DELTA TIME 0,000 ,033 ,067 ,100 • 133 ,167 ,200 ,233 ,267 ,300 ,333 ,367 ,400 .433 ,467 ,500 ,533 ,567 .600 ,633 ,667 ,700 .733 ,767 ,800 ,833 ,867 ,900 ,933 ,967 ,000 ,033 ,067 ,100 ,133 ,167 ,200 ,233 ,267 ,300 PRESSURE (PSI) 36 58 91 106 120 136 138 147 154 161 168 174 176 162 184 186 188 190 191 193 195 196 197 196 199 200 201 201 202 202 203 203 204 204 204 204 205 205 205 205 ,261 ,788 ,006 ,465 ,671 ,397 ,428 .898 ,363 ,999 ,568 ,522 ,843 ,066 .469 ,720 ,716 .58 5 ,j?54 .811 .239 ,516 ,641 ,639 .533 9346 ,065 ,703 ,295 ,783 ,235 ,676 ,025 ,326 e628 ,907 ,116 ,301 ,487 ,638 TIKE DATE COMMENTS HR M ) N 18 59 NOV 12, p1974 OPEN TO FLOW 19 01 NOV 12/ r!974 19 03 NOV 12. p 1974 19 05 NOV 12/ . 1974 19 07 NOV 12/ r 1974 19 09 NOV 12/ r 1974 19 11 NOV 12/ .19 7 4 19 13 NOV 12/ r 1974 19 15 NOV 12/ .1974 19 17 NOV 12, p 1974 19 19 NOV 12, » 1974 19 21 NOV 12, . 1974 19 23 NOV 12< - 1974 19 25 NOV 12. . 1974 19 27 NOV 12/ . 1974 19 29 NOV 12/ p 1^74 19 31 NOV 12 . 1^74 •• 19 33 NOV 12/ r 1974 19 35 NOV 12/ r 1974 19 37 NOV 12/ p 1974 , 19 39 NOV 12 p 1974 19 41 NOV 12 f 1974 19 43 NOV 12 p 1974 19 45 NOV 12 p 1974 19 47 NOV 12/ r 1974 19 49 NOV 12, p 1 9 7 4 19 51 NOV 12 p 1974 19 53 NOV 12 p 1 9 7 4 19 55 NOV 12 p 1974 19 57 NOV 12 p 1974 19 59 NOV 12 ,1974 20 01 NOV 12/ p 1974 20 03 NOV 12/ p 1974 20 05 NOV 12, p1974 20 07 NOV 12 p 1974 20 09 NOV 12/ p 1 9 7 4 20 11 NOV 12 p 1974 20 13 NOV 12/ p 1974 20 15 NOV 12/ p 1974 20 17 NOV 12, p1974 ♦ PAGE 'I B-366 JOB NUMBER SPG-iiaiO-A GAUGE/RUN NUMBER 212 RUN NO, i DST NOB 4 U-12-74 SPERRY-SUN PRECISION SU3SURFACE PRESSURE GAUGE REPORT* DATE OF JO: [ TO 11-13-"/ DATE OF RU; 11-18-7' > DELTA TIME 333 367 400 433 467 500 533 567 600 633 66? 700 733 767 800 833 867 900 933 967 000 033 067 100 133 167 200 233 267 300 333 367 400 433 467 500 533 567 600 633 PRESSURE CP3I) 205.800 205,916 206,032 206.125 206,230 206,299 206. 346 206,450 206t«97 206.555 206,624 206B671 ,706 ,752 .798 r822 206, 845 206.880 ,1/26 .949 ,984 ,996 ,031 ,065 207,069 207,100 207.147 207;158 207-170 207,181 207.205 207.216 239 206 206 206 206 206 206 206 206 207 207 207 207 207 207 207 207 207 207 251 274 297 332 344 355 379 TIME DATE COMMENTS HR MIN 20 19 NOV 12,1974 20 21 NOV 12,1974 20 23 NOV 12, 1974 20 25 NOV 12,1974 20 27 NOV 12,1974 20 29 NOV 12,1974 20 31 NOV 12,1974 20 33 NOV 12,1974 20 35 NOV 12,1974 20 37 NOV 12,1974 20 39 NOV 12,1974 20 41 NOV 12,1974 20 43 NOV 12,1974 20 45 NOV 12,1974 20 47 NOV 12,1974 20 49 NOV 12,1974 20 51 NOV 12,1974 20 53 NOV 12,1974 20 55 NOV 12, 1^74 20 57 NCV 12,1974 > 20 59 NOV 12, 1^74 21 01 NOV 12, 1974 21 03 NOV 12,1*74 21 05 NOV 12,1974 21 07 NOV 12, 1^74 21 09 NOV 12,1974 21 11 NOV 12,1974 21 13 NCV 12, 1974 21 15 NOV 12, 1974 21 17 NOV 12,1974 21 19 NOV 12,1974 21 21 NOV 12,1974 21 23 NCV 12,1974 21 25 NOV 12,1974 21 27 NOV 12, 1974 21 29 NOV 12,1974 21 31 NOV 12, 1974 21 33 NOV 12, 1974 21 35 NOV 12,1974 21 37 NOV 12, 1974 PAGE II B-367 JOB NUMBER 8PG-1121Q-A GAUGE/RUN NUMBER 212 RUN NO, 1 DST NOc 4 li-12-74 > SPERRY-SUN PRECISION SU3SURFACE PRESSURE GAUGE REPORT DATE OF JO [ TO 11-13-7 DATE OF RU . 11M8-7' DELTA TIME > ?. c 2 2 2 2 2 2 2 ?. 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 ,667 .700 ,733 ,767 .800 .833 .867 .900 ,933 e967 t 000 ,033 .067 ,100 ■ 133 .167 ,200 ,233 ,267 .300 ,333 ,367 ,400 ,433 ,467 ,500 .533 ,567 ,600 ,633 ,667 ,700 .733 ,767 ,800 ,833 ,867 ,900 ,933 ,967 PRESSURE CPSI) 207,390 207,402 2073414 207,425 207,448 207,460 207,472 207,483 207-495 207,506 207,518 207.530 207.541 207,553 207,564 207.588 207,576 207.599 207:i34 207,660 207:738 208,098 208.435 209.236 209B410 209,584 209^723 209^862 209^932 210j048 210.141 209,770 209,955 209.595 209.363 209,143 208.957 208.806 208,679 208,574 TIME DATE COMMENTS HR MIN 21 39 NOV 12, 1974 21 41 NOV 12,1974 21 43 NOV 12/1974 21 45 NOV 12,1974 21 47 NOV 12,1^74 21 49 NOV 12,1974 21 51 NOV 12,1974 21 53 NOV 12, 1974 21 55 NCV 12, 1974 21 57 NOV 12,1974 21 59 NOV 12, 1974 22 01 NOV 12, 1974 22 03 NOV 12,1974 22 05 KJOV 12,1974 22 07 KOV 12, 1^74 22 09 NOV 12,1974 22 11 NOV 12,1^74 22 13 NCV 12, 1974 22 15 NOV 12, 1^74 22 17 NOV 12, 1^74 • 22 19 NCV 12, 1^74 22 21 NCV 12,1974 22 23 NOV 12,1974 22 25 NOV 12,1974 22 27 NCV 12,1974 22 29 NCV 12,1974 22 31 NOV 12,1974 22 33 NOV 12,1974 22 35 NOV 12,1974 22 37 NOV 12, 1974 22 39 NOV 12, 1974 22 41 NOV 12,1974 22 43 NOV 12, 1^74 22 45 NOV 12,1974 22 47 NOV 12,1^74 22 49 NOV 12, 1974 22 51 NOV 12, 1974 22 53 NOV 12, 1Q74 22 55 NOV 12,1974 22 57 NOV 12 #1974 PAGE 4 II B-368 JOB NUMBER SPG-J I2i0-A GAUGE/RUN NUMBER 212 RUN NO, i DST NO, n-12-74 SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DATE OF JO TO 11-13-7^ DATE OF RU? 1W8«*7' DELTA TIME • ,000 ,033 ,067 ■ 1013 .133 ,167 ,200 .233 ,267 ,300 ,333 ,367 ,400 ,433 ,4b7 ,500 ,533 ,567 ,600 ,633 ,667 ,700 ,733 ,767 ,800 ,833 ,867 ,900 ,933 ,967 ,000 ,033 ,067 ,100 .133 ,167 ,200 ,233 ,267 ,300 PRESSURE CPSX) 228,603 211,023 192,163 178,515 165,377 152,912 146,703 145,368 143,256 143.279 143,244 143.256 142.710 142.943 143.02a 142,873 142,638 142,745 142.722 142.931 142,943 142.836 142,710 142:873 1421884 142,745 142,594 142,780 142,618 142.478 142, b76 127,971 144.695 151,926 154.676 162,823 170,193 174-731 179,548 182,267 TIME DATE COMMENTS HR HJN 22 59 NOV 12*1974 START AIR 23 01 NOV 12,1974 INJECTION 23 03 NOV 12,1974 23 05 NOV 12,1Q74 23 07 NOV 12,1074 23 09 NOV 12,1074 23 11 NOV 12,1974 23 13 NOV 12,1^74 23 15 NOV 12*1974 23 17 NOV 12,1°74 23 19 NOV 12,1°74 23 21 NOV 12,1974 23 23 \CV 12,1974 23 25 NOV 12,1Q74 23 27 NCV 12,19 74 23 29 K'CV 12, 197 4 23 31 NOV 12, 1974 23 33 NCV 12#197« 23 35 NOV 12,107a 23 37 NOV 12,1974 23 39 NCV 12, 1974 23 41 NCV 12, 1974 23 43 NCV 12,1974 23 45 NOV 12,1974 23 47 NOV 12, 1974 23 49 NOV 12, 1074 23 51 NCV 12,1974 23 53 NCV 12, 1974 23 55 NOV 12,1974 23 57 NCV 12, 1974 23 59 NOV 12, 107^ 00 01 NOV 13,1974 END AIR 00 03 NOV 13,1974 INJECTION 00 05 NOV 13,1974 00 07 NCV 13, 1974 00 09 NCV 13, 1074 00 11 NOV 13,1974 00 13 NOV 13,1974 00 15 NOV 13,1974 00 17 NOV 13,1974 PAGE 5 II B-369 • JOB NUMBER 8PG-U210-A GAUGE/RUN NUMBER 212 RUN NO, J DST NO, 4 ti-12-74 SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT. DATE OF JO' [ TO 11-13-7 DATE OF RUr j 11-18-7- DELTA TIME 5,533 5,367 • ,400 ,433 ,467 ,500 • 533 • 567 ,600 ,633 ,667 ,700 ,733 ,767 ,600 ,633 ,867 ,900 ,933 ,967 ,000 ,033 ,067 ,100 .133 ,167 ,200 ,233 ,267 ,300 ,333 ,367 ,400 ,433 ,467 ,500 ,533 ,567 ,600 ,633 PRESSURE CPSI) 183,865 165,943 187,370 189,413 191,293 193,034 202,934 194.577 196,063 196,249 198,419 199,429 200.287 201,123 201,819 ,458 .015 .514 .932 ,350 ,721 .023 .023 ,689 .080 238,285 244,924 252.015 256,913 256.193 251.667 247.350 243,369 249^891 260.209 2780628 295.746 312.691 327,326 340,975 TIME HR MIN DATE COMMENTS 202 203 203 203 204 204 205 205 221 230 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 01 03 05 07 09 11 13 15 17 19 21 23 25 27 29 31 33 35 37 NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NCV NOV NOV NCV NOV NOV NOV NOV NOV NCV NCV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV o74 ^74 974 974 974 074 974 Q74 974 974 97« Q74 07a 974 97 4 97 4 074 QJU 074 974 974 974 97^ Q74 97a 974 974 97 4 974 974 974 974 9 74 974 974 974 974 974 974 974 START 5 GAL, MIN, INJECTION RATE END 5 GAL, MIN INJECTION RATE START 10 GAL, MIN, INJECTION PAGE 6 II B-370 J03 NUMBER 8PG-U210-A GAUGE/RUN NUMBER 212 RUN NO, 1 DST NO, 4 DATE OF JO U-12-74 TO 11-13-7^ DATE OF RUf • SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA TIME PRESSURE (PSI) TIME HR MIN DATE ' 60 V 700 733 767 800 833 8fa7 900 933 967 000 033 067 100 133 167 200 233 267 300 333 367 400 433 343.934 344,155 605 541 150 378 172 632 ,969 f 029 911 o002 .932 ,734 359,219 349.029 ,069 923 383-998 39Q;6U8 392J633 394,200 395,476 396,207 333 324 316 318 341 380 380 380 380 382 381 369 340 361 01 01 01 01 01 01 01 01 01 01 01 02 02 02 02 02 02 02 02 02 02 02 02 02 39 41 43 45 47 49 51 53 55 57 59 01 03 05 07 09 11 13 15 17 19 21 23 25 NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1Q74 1<574 197" 1974 1974 1^74 1974 1974 1974 1974 1974 COMMENTS END 10 GAL. MIN, INJECTION START 20 GAL, MIN, INJECTION END 20 GAL, MIN, INJECTION START 9 GAL. MIN, INJECTION END 9 GAL, INJ 224 POINTS REPORTED THIS RUN PAGE 7 II B-371 • JUB NUMBtN 8PG«U2J0-A DATE OP JO tl«12-7« TO 11-13-7. SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT PREPARED FOR ATLANTIC RICHFOELD COMPANY WELL NUMBER FEDERAL SG-17 FIELD/LEASE SORGHUM GULCH COUNTY/PARISH RIO BLANCO STATE COLORADO TYPE OF TEST DRILL STEM REFERENCE ELEV GROUND LEVEL . ADDITIONAL INFORMATION USED GAUGE NO, 95 WITH 1000 LB, ELEMENT GAUGE TEST DEPTH IS 826,71 FEET GAUGE IS IN ANNULUS WITH PACKER SET AT 666,0 FEET il POINTS REPORTED THIS JOB PAGE 1 OF 2 PAGES I I B-372 • PRESSURE GAUGE DRILL STEM TEST SHEET Job No.5fcW/Z/^ Date /C'/Z'^^ Run/Vf/ ^-^^^ Office r^^>F^r/d Customer AffS £~r/>£- LocationJ /£.. 3S , s* ■/'-^' £v^r// USE MILITARY TIME FOR ALL TIMES Time Date Time Arrive: Well/Dock 1. "- '' /.'- /?-"/'■' 2. Depart: Well/Dock 1. y " / ■■'. /A/Z-y-V 2. Gauge Start in Hole 1. / ?'- ~ Gauge Out of Hole l.C^^S' /A/g-7" 2. No. Trips / Miles Date Time Charged Total Mileage Hrs. /'? Hrs, Top Gauge # ^j7 Element #JP3*7£j£ Btm. Gauge # f /— Element # ?/;X' ^ ~~ Type Tool / /'.,;' Ranse //" " 2 Time Mode ^ //^/. Range_ Time Mode _Test Depth "T:"'" *T! r' Zero Point^ •/ J • ■? ^ ,- V .c //CA Packer Depth f - *, '' Tail Pipe Depth_ 6/ /'. /■ Top Gauge Depth_ y-^,-7/ y Bottom Hole Temp._ ~\ r~ Atmos. Tcmp._ "2 ■ ?- '3-w • .-• r-v; On Bottom )f/ '' TIME INFORMATION Time Date Bottom Gauge Depth -/^~''- ^"z' PRESSURE INFORMATION Packer Set / '-.-/,/ //. / z - -//^ Initial Open / '1-j- '•?", 1 ^ /'■ ' r • 'A' V Initial Shut-In ';?-?■/?<:*? /'-■'?.-':•>'' ^terfr Flow /rTf -/■?// //-/7-~A' Final Shut-In Packer Unseated r* v //"/:/' /'- '5-VV Initial Hydrostatic Mud Initial Draw Down Initial Build-Up Final Flow Final Build-Up Final Hydrostatic Mud Mud Weight .-/'-> .'A-/ / -/2 -■/*■' Top Gauge '/ ■ " ~ '{?S:."/2r Remarks' '■ , .■'"'-''/ '■ / r£ .-<\"/ .'."• TIME OF SURFACE NULLS Bottom Gauge A^'-T :<*" ^.C^'SL^r L A-1/: / - v • — /■.' ' / ••'-'•.'''>* V 7 ^ — •.) '•'•'' : n? u:/£P- p.-' *A :. : . , >'<»'Y rPz/J SP-A23 11 B-374 > ■• , • / Operator jc.:>btc : - ,, i or: . - - — — H I J U i . . u II H-375 F.R. //04365 C O x Y ! © . wee »F. Ca, °F. @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. Ccu °F. Remarks: Address 1500 SECURITY LIFE BUILDING ; DENVER, COLORADO 80202; ATTN: MR. [ ). B. TA 1 T (. .mpciny Well ATLANTIC RICHFIELD COMPANY Field SORGHUM FEDERAL S-G ^17 Test .ntervol __9±9 ' TO 970 location SEC. 16-3s-96w Test # N B-377 - D°«° 11-14-74 County Tcrhnicion R I 0 BLANCO State COLORADO r 0UJ \ Y( VERNAL) Test Approved By MR. L. M. POW E R S Field Report No. 04365 C No. Reports Requested I 4 [ 1 3 > Page 2 JO!;-:.. '. I .J j ..found a L, tier way 1 PRESSURE DATA f Instrument No. T-254 Copocity (P.S.I.G.) 1700 Field Report No. 04365 C Instrument Depth 896* Instrument Opening 1 NS IDE TIME DATA Time Given Time Computed Pressure Grcdient P. S.I. /Ft. Well Temperature F. 85 Initial Hydrostatic M jd A Initial Shut-in B Mins Mins. Initial Flow C Min?. Min*. Mins Mins. Mins Mins. Final F low D Mins Mins. Final Shut-in E Mins Mins. Final Hydrostatic Mu d F Remarks: ! 'Shut in pressure did not reach static reservoir pressure. Clock Travel inches per min. PRESSURE INCREMENTS PO 1 NTS Point Minutes Pressure | . T + At ■ Point T + At t Minutes Pressure At Point Minutes I Pressure T + At A, f1 226.5 1 A 0 7.9 50 i 69.0 2 257.0 2 249.0 55 73.6 3 7.9 4 .249.8 60 77.8 4 7.9 6 249.8 65 81.6 5 247.9 8 250.2 70 85.5 6 257.8 10 248.7 75 88.9 7 14.0 12 248.3 80 92.7 8 220.8 14 248.3 85 96.6 9 237.2 16 247.9 90 101.5 10 191.0 18 247.9 95 105.7 11 200.9 20 47.9 100 109.5 12 148.1 22 247.9 105 114.5 13 150.4 24 247.9 110 119.1 14 116.0 26 247.9 115 124.1 15 184.5 28 247.9 120 127.5 16 285.4 30 247.9 1 25 130.9 17 448.2 32 247.9 130 134.8 18 440.5 34 247.9 135 138.6 V) 306.0 36 247.9 140 141.6 20 267.8 5 38 247.9 145 143.9 21 238.7 150 146.2 7 0 14.0 155 148.5 5 18.6 100 151.2 10 25.1 165 153. 1 k 15 31.2 170 155.4 9 20 36.5 175 15 . 1 25 41.9 180 1 6< . A | 30 48.0 II H-^7« II 5 16 . 1 1 35 53.7 *- *- L) J / O 190 165.7 40 59.1 195 '.6 45 63.3 II 1.6 ! C : T I NUED CON! IMVt-D Page 3 i - - - Jr- ■ . : - . ..■._ I Vi\i ...found a tett, r wsy 1 PRESSURE DATA f Instrument No. T-254 Copacity (P.S.I.G.) Field ReporrNo. 04365 C Instrument Depth Instrument Opening TIME DATA Time Given Time Computed Pressure Gradient P. S.I. /Ft. Well Temperature F. Initial Hydrostatic M jd A Initial Shut-in B Mins Mins. Initial F low C Mins Min*. Mins Min*. Mins Mins. Fina 1 F low D Mins Mins. Final Shut-in E Mins Mins. Final Hydrostatic Mu d F Remarks: j | *Sr>ut in pressure did not reach stati c reservoir pressure. Clock Travel inches per min. PRESSURE INCREMENTS 1 Point Minutes Pressure T • \t Point T + \ t Point t • Minutes Pressure At Minutes T + At Pressure At 205 171.5 360 1 207.0 ! 26 150.8 ! 210 173.4 207.0 28 150.8 215 175.3 370 '207.8 30 150.4 220 177.2 375 208.5 32 150.4 225 178.7 380 210.8 34 150.4 230 1 180.6 385 211.2 36 150.4 235 182.2 390 211.2 13 38 150.4 240 183.7 395 212.7 40 116.0 245 184.8 400 213.9 42 116.0 250 186.0 405 215.4 14 43 116.0 255 186.7 410 217.7 5 125.2 260 187.9 4 1 5 219.6 10 130.6 265 189.0 A20 220.8 15 1 35. 2 270 190.2 :• 425 220.8 20 139.7 275 191.0 430 220.8 25 142.8 280 192.1 8 431 220.8 30 145.9 285 193.2 35 148.5 290 194.0 9 1 237.2 40 149.7 295 195.2 2 184.1 45 152.0 300 196.3 10 4 191.0 50 154.3 305 197.1 55 158.5 310 197.8 11 6 200.9 60 160.8 31r> 199.0 8 158.1 65 163.4 320 199.7 10 145.9 70 166.5 1 } 325 200.9 12 143.6 75 169.2 w 330 201.7 14 142.8 80 171.5 335 , ^ ;. 1 16 142.8 85 173. -1 . 1 12 18 148.1 - 1 1 B-379 90J 176.0 i 05.5 20 150., 178. 1.0 22 150.8 100 180.2 ;l : 1.0 24 150.8 1 05 U.v CON 7 If.ULD CO,-! i :,">, [i corn INULU Page 4 ■ » r i ' PRESSURE DATA J Instrument No. T-254 Copacit y (P.S.I.G.) Field Roport No. 04365 C Instrument Depth Instrument Opening TIME DATA Time Given Time Computed Pressure Gradient P. S.I. /Ft. Well Temperature F. Initial Hydrostatic Mud A Initial Shut-in B Mins Mins. Ini tic 1 F low C M i n s Mins. Mins Mins. Mins Mins. Final F low D Mins Mins. F inal Shut-in E Mins 1 Mins. Final Hydrostatic Mud F 1 Remark s: I Shui in pressure did not reach static reservoir pressure. Clock Travel inches per min. PRESSURE INCREMENTS Point Minutes Pressure T+At Point T+At Point T + At At Minutes Pressure At Minutes Pressure ! At f 110 184.5 15 111 184.5 - 2| 199.7 4 214.6 6 230. 'i 8 244.8 10 259.4 12 273.9 14 285.4 16 285.4 18 285.4 285.4 1 C 22 285.4 24 299.1 26 320.9 28 348.0 30 375.2 32 401.2 3A 425.6 36 448.2 38 448.2 40 448.2 17 42 44 448.2 442.8 A 46 442.1 r_ 48 441.3 380 50 440.5 T T P 44' '. i i i) 18 440.5 Page 5 - - PRESSURE DATA Instrument No. Copacity (P.S.I.G.) Instrument Depth Instrument Opening Pressure Gradient P. S.I. /Ft. Well Temperature F. Initial Hydrostatic Mud Initial Shut-in Initial F low F inal F low Final Shut-in Final Hydrostatic Mud ^Q22_ _2800 902" NS IDE 85 Field Report No. 04365 C TIME DATA ime uiven Time Computed . Mins . . M i n s . Mins. . Mins. Mins. . Mins. . Min s. .Mins. .Mins. .Mins. .Mins. .Mins. Remarks: Shut in pressure did not reach static reservoir pressure. C lock Trave I inch es per mm. PRESSURE INCREMENTS PO I NTS Point ^Minutes T + A Pn Point Minutes T + A, Point Minutes Pressure T + At At 1 189.0 A 0 6. 1 50! 57.0 ? 213.4 2 208.9* 55 1 61.0 3 6.6 4 208.9 60! 64.4 4 6.6 6 208.9 65! 67.2 | 5 209.4 8 208.9 70 70.6 1 6 216.2 10 208.9 75 i 74.0 7 12.2 12 208.9 | 80 1 76.8 R 186.8 1A 208.9 85 80.8 9 199.8 16 208.9 90 85.3 10 125.0 18 208.9 95 89.3 11 174.3 ?o 208.9 100 92.7 12 123.9 ?? 208.9 105 96.1 13 125.6 24 208.9 no 99.5 14 98.9 26 208.9 n? 103.5 15 155.0 28 209.4 120 106.3 16 241.7 30 209.4 1 25 109.7 17 380.0 32 209.4 130 112.5 18 373.2 34 209.4 135 115.4 19 260.4 36 209.4 140 117.6 20 228.7 5 38 209.4 145 119.3 21 202.6 150 121.6 7 0 12.2 155 123.3 5 13.4 160 125.6 10 19.0 165 127.8 # 15 24.1 170 129.0 20 28.7 175 131.2 25 33.8 I I B-38] 180 132.9 . 38.9 1 :■ ! 135 . 43.4 1 1 31 . 40 47.9 1 95 13; ■ 45 53.0 i.9 COM 1 KJULD C0N1 1 \'ut D Page 6 ..found e bsttsr way 1 PRESSURE DATA W Instrument No. J-029 Copocity (P.S.I.G.) • Field Report No. 04365 C Instrument Depth Instrument Opening TIME DATA Time Given Time Computed Pressure Gradient P. S.I. /Ft. Well Temperature F. Initial Hydrostatic Mud A Initial Shut-in B Mins Mins. Initial Flow C Mins M i r. s . Mins Mins. Mins Mins.. Final Flow D Mins Mins. Final Shut-in E Mins Mins. Final Hydrostatic Mud F Remarks: Shi/t in pressure did not reach static reservoir pressure. Clock Travel inches per min. PRESSURE INCREMENTS * Point Minutes Pressure j T + At Point T + At Point At Minutos Pressure At Minutes T + At Pressure j At w 205 142.0 360 174.3 28 125.6 210 143.7 365 174.9 30 125.6 215! 144.8 370 175.4 32 125.6 220 146.5 375 176.0 34 125.6 225 147.7 380 177.1 36 125.6 230 149.4 385 179.4 13 38 125.6 235 151.1 390 179.4 40 98.9 240 152.8 395 179.4 42 98.9 245 153.9 400 179.4 14 43 98.9 250 155.0 405 181.1 5 104.6 255 155.6 410 183.4 10 108.6 260 156.7 415 185.1 15 112.5 265 157.3 420 186.8 20 115.9 270 157.9 425 186.8 25 118.8 275 159.0 430 186.8 30 121.6 280 160.0 8 431 186.8 35 123.9 285 160.7 40 125.6 290 161.8 9 1 199.8 45 126.1 295 163.0 2 157.3 50 128.9 300 163.5 10 4 125.0 55 133.5 30! i 164. / 11 6 174.3 60 134.1 310 165.2 8 134.6 65 136.9 315 320 166.4 10 123.9 70 138.6 167.5 12 122.7 75 141.4 A 325 168.1 14 122.1 80 143.7 W 169.2 16 122.1 85 145.4 340 170.3 12 18 123.9 I I 1) 7 01 90 I ■] 1 . 1 i / ' . i 20 126.1 D-3«Z 95 I49.4 • 171.5 22 125.6 1 ( >( ) 151.6 i /;.0 [•A 125.6 105 15; . 174.3 26 125.6 110 155. con i! i nuiio cgn inul: CON1 INUED Page 7 ' • _/ £' t etter 1 PRESSUR 5 DAT A J Instrument No. J-029 Capacity (P.S.I.G.) i Field Report No. 04365 C Instrument Depth Instrument Opening Pressure Gradient P. S.I. /Ft. TIME DATA Well Temperature F. Initial Hydrostatic Mud A Time Given Time Computed Initial Shut-in B Mins. Min*. Initial Flow C Mins Min*. Mins Mins. Mins Min*. Finol Flow D Mins Mins. Final Shut-in E Mins Mins. Final Hydrostatic Mud F Remark s: ; * Shuf in pressure did not reach static reservoir pressure. Clock Trovel inches per min. PRESSURE INCREMENTS Point Minutes Pressure 4 T + > At Point T + At Point T + At t ; Minutes Pressure At Minutes Pressure i At i ,T 111 I 155.0 • 2 167.5 4 180.0 > 6 193.0 8 205.5 10 217.9 12 229.8 14 240.6 16 241.7 18 241.7 20 241.7 16 22 241.7 24 257.6 26 280.3 !• 28 304.1 30 326.8 32 348.9 34 36 371.5 380.0 38 380.0 40 380.0 17 42 380.0 A A 377.8 46 376.1 ± 48 374.4 w 50 373.2 51 373.2 1 8 52 373.2 1 I B-383 0 Page 8 ...found a hsttsr ivzy PRESSURE DATA J Instrument No. J- 405 Field Report No. Capacity (P.S.I.G.) • 2800 04365 C Instrument Depth 937' Instrument Opening OUTS IDE TIME DATA Time Given Time Computed Pressure Gradient P. S.I. /Ft. Well Temperature F. 85 Initial Hydrostatic Mud A Initial Shut-in B Mins Mins. Initial F low C Mins Mins. Mins Mins. Mins Mins. Final F low D Mins Mins. F inal Shut-in E Mins Mins. Final Hydrostatic Mud F Remark s: * Shut in pressure did not reach static reservoir pressure. Clock Travel inches per min. PRESSURE INCREMENTS PO ! NTS Point Minutes Pressure T t Point Minutes Pressure T + At A, Point Minutes 1 Pressure T + At At W 1 203.5 H 15.2 50 63.8 I 2 227.8 1 2 220.5 55 68.4 3 19.2 4 220.5 60 72.3 4 15.2 6 220.5 65 75.7 5 220.5 8 220.5 70 79.1 6 226.7 10 220.5 75 82.5 7 23.7 12 220.5 80 85.9 8 200.1 14 220.5 85 89.3 9 212.0 16 220.5 90 93.3 10 174.1 t 18 220.5 95 97.2 11 185.4 20 220.5 100 100.6 12 134.5 22 220.5 105 105.7 13 136.8 24 220.5 110 109.7 14 111.3 26 220.5 115 114.2 15 163.9 28 220.5 120 117.6 16 251.0 30 220.5 125 121.0 17 391.3 32 220.5 130 123.8 18 386.2 34 220.5 135 126.6 19 273.1 36 220.5 140 128.9 20 248.2 5 38 220.5 145 131.1 21 215.4 150 133.4 7 0 23.7 155 135.7 5 23.7 160 1 37 . 4 10 27.6 105 139.1 4 15 32.2 170 141.3 ¥ _ZQ_ 36.7 175 143.0 ?R 41.fi 1fi0 144.7 30 46.9 I I B-384 1 i :.. 147.0 35 50.fi 1 5 'J 148.7 40 55.9 1 95 150.4 45 60. 5 1! . ! r ON r I NUED CON" ' 1 NUED ♦ Page 9 I ...found a letter way PRESSURE DATA Instrument No. Capacity (P.S.I.G.) J- 405 Instrument Depth Instrument Opening Pressure Gradient P. S.I. /Ft. Well Temoerature F. Initial Hydrostatic Mud Initial Shut-in Initial F low Final F I o w Final Shut-in Final Hydrostatic Mud Field Report No. 04365 C TIME DATA Tl me u i ven Time Computed Mins. . Mins. .Mins. .Mins. Mins. M i n s . . Mins. .Mins. .Mins. .Mins. .Mins. Mins. 'Shut in pressure did not reach itofic reservoir pressure. :k Tr _ inches per min. PRESSURE INCREMENTS Point iinutos T+At At Point Minutes At Point Minutes T + .\t 205! 153.. 360 184.9 26 137.9 I 210 156.6 365 186.0 28 137.4 215 158.3 370 186.6 30 137.4 220 159.4 375 187.1 32 137.4 225 159.4 380 188.3 34 136.8 230 161.1 385 188.8 36 136.8 235 162.8 390 189.9 13 38 136.8 240 163.9 395 190.5 40 111.3 245 164.5 400 191.1 42 111.3 250 165.6 405 193.3 14 43 111.3 255 166.2 4 1 0 197.3 5 117.6 260 167.3 415 200.1 10 122.1 265 167.9 420 200.1 15 123.8 270 169.0 425 200.1 20 127.7 275 169.5 430 200.1 25 130.6 280 170.7 8 431 200.1 30 133.4 285 171.3 35 135.7 290 172.4 9 1 212.0 40 136.2 295 173.0 2 169.0 45 137.9 300 174.1 10 4 174.1 50 140.8 305 174.7 11 6 185.4 55 143.0 310 175.8 8 148.1 60 145.3 315 176.4 10 137.9 65 147.5 320 176.9 12 135.7 70 149.8 0 325 178.1 14 135.1 75 152.1 179.2 16 145.1 80 153.8 179.8 12 18 134.5 11 B-385 85 155.5 180.9 20 137.4 157.2 • 345 182.0 22 137.9 159.4 i 182.6 24 137.9 100 160.5 183. 1 1 05 1. 2.1 CON! 1 NUEO CON 1 1 nued CON! 1 NUED # Page 10 . ...found a Ltusr way I , PRESSURE DATA m Instrument No. J -405 Capacity (P.S.I.G.) • Field Report No. 04365 C Instrument Depth Instrument Opening TIME DATA Time Given Time Computed Pressure Gradient P. S.I. /Ft. Well Temperature F. Initial Hydrostatic Mud A Initial Shut-in B Mins Mins. Mins Mins. Mins. Initial F low C Mins Mins Mins Final F low D Mins Mins . Final Shut-in E Mins Mins. Final Hydrostatic Mud F Remark s: Shut in pressure did not reach static reservoir pressure. Clock Travel inches per min. PRESSURE INCREMENTS • Point Minutes Pressure A T + At At Point Minutes Pressure T + At At Point Minutes Pressure T + At At * 110 163.9 15 111 163.9 2 176.9 4 189.4 6 201.8 8 214.3 10 226.7 12 238.9 14 249.3 16 250.5 18 251.0 20 251.0 16 22 251.0 24 253.3 26 277.0 28 300.8 30 322.8 32 344.9 34 367.0 36 391.3 38 391.3 40 391.3 17 42 391.3 44 390.7 46 389.0 " 48 J. 3 50 6.2 51 6.2 -386 . 18 52 6.2 I I B — 0 cm JOHNSTON ...found a better way GUIDE TO IDENTIFICATION OF DRILL STEM TEST PRESSURE CHARTS JOHNSTON FIELD REPORT NO. REPORTS RECORDER NO. CAPACITY REQUESTED -\ C-l A. Initial Hyd. Mud B. Initial Shut-in C. Initial Flow D. Final Flow E. Final Shut-in F. Final Hyd. Mud The following points are either fluctuating pressures or points indicating other packer settings, (testing different zones). A-l, A-2, A-3. etc. Initial Hyd. Pressures B-l, B-2, B-3, etc Subsequent Shut-in Pressures C-l, C-2, C-3, etc. Flowing Pressures D-l, D-2, D-3, etc. Subsequent Final Flow Pressures E-l, E-2, E-3, etc. Subsequent Final Shut-in Pressures F-l, F-2, F-3, etc Final Hyd. Mud Pressures Z — Special pressure points such as pumping pressure recorded for formation breakdown. 11 j.zi.^j.r^rrzTfEaBtJC^Tri . . FIELD REPORT NO. RECORDER NO. 04365 C CAPACITY T-254 REPORTS REQUESTED 1700# 14+ 0 i 3)&3) ' " B-387 GUIDE TO IDENTIFICATION OP DRILL STEM TEST PRESSUR J JOHNSTON FIELD REPORTS REPORT NO. RECORDER NO. CAPACITY REQUESTED uu JUKKbl Ui\i XLD ...found a better nay T ( 3£-L: RE CHARTS A. Initial Hyd. Mud B. Initial Shut-in C. Initial Flow D. Final Flow E. Final Shut-in F. Final Hyd. Mud The following points are either fluctuating pressures or points indicating other packer settings, (testing different zones). A-l, A-2, A-3, etc. Initial Hyd. Pressures B-l, B-2, B-3, etc. Subsequent Shut-in Pressures C-l, C-2, C-3, etc. Flowing Pressures D-l, D-2, D-3, etc. Subsequent Final Flow Pressures E-l, E-2, E-3, etc. Subsequent Final Shut-in Pressures F-l, F-2, F-3, etc. Final Hyd. Mud Pressures Z — Special pressure points such as pumping pressure recorded for formation breakdown. raraaags' ' V»> . -■ FIELD REPORT NO. RECORDER NO. ■vj^^/ 04365 C CAPACITY 2800# J- 029 FiCPOflTS REQUESTED i-1 i 14+ •• i ; i i : * I I B-388 ... ! # on JOHNSTON ...found a betlsr way GUIDE TO IDENTIFICATION OF DRILL STEM TEST PRESSURE CHARTS A. Initial Hyd. Mud jo^nsTorj FIELD REPORTS REPORT NO. RECORDER NO. CAPACITY REQUESTED C-l B. Initial Shut-in C. Initial Flow D. Final Flow E. Final Shut-in F. Final Hyd. Mud The following points are either fluctuating pressures or points indicating other packer settings, (testing different zones). A-l, A-2, A-3, etc. Initial Hyd. Pressures B-l, B-2, B-3, etc. Subsequent Shut-in Pressures C-l, C-2, C-3, etc. Flowing Pressures D-l, D-2, D-3, etc. Subsequent Final Flow Pressures E-l, E-2, E-3. etc. Subseauent Final Shut-in Pressures F-l, F-2, F-3. etc. Final Hyd. Mud Pressures Z — Special pressure points such as pumping pressure recorded for formation breakdown. rm JOHNSTON FIELD REPORT NO. RECORDER NO. :j. ?o- 04365 C CAPACITY J- 405 REPORTS REQUESTED .1 i 2800# 14+ L.- ■ .s. ■4 ii j :}-. II B-389 (72) i£) i .. \ I > JOB NUMBER 3PG-1 1210-B DATE OF JO[ il»ia-7« TO 11-15-7^] SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT PREPARED FOR ATLANTIC RICHFIELD COMPANY ^ WELL NUMBER FEDERAL SG-17 FIELD/LEASE SORGHUM GULCH COUNTY/PARISH RIO BLANCO STATE COLORADO TYPE OF TEST DRILL STEM REFERENCE ELEV GROUND LEVEL ADDITIONAL INFORMATION USED GAUGE NO, 212 WITH 1000 LB, ELEMENT GAUGE TEST DEPTH IS 964,55 FEET A GROUND LEVEL REFERENCE IS 7036 FEET TESTED 919 FEET TO 970 FEET II B-390 93 POINTS REPORTED THIS JOB PAGE 1 OF a PAGES SPG. NUMBER '1121Q-B GAUGE/RUN NUMBER 196 RUN NO, 2 DST N06 5 n»i4»74 SPERRY-SUN 'PRECISION SUBSURFACE PRESSURE GAUGE REPORT DATE OF JO! TO i 1-15-7* ;; > DATE OF RU! 11-18-7* DELTA PRESSURE TIME (PSI) 0,000 15,161 ,017 17a, 546 ,033 1859906 ,050 184,389 ,067 186,689 ,063 187,068 ,100 186,357 ,U7 166,143 .133 186,357 ,150 186,736 ,167 184,223 ,163 182,990 ,200 182,824 ,217 182,661 .233 182.567 ,250 182.421 .317 182,326 ,ai7 182,326 ,433 182,255 ,667 182,278 TIME DATE COMMENTS HR MIN 15 01 NOV 14,1974 SHUT IN 15 02 NOV 14* 1974 15 03 NOV 14, 1974 15 04 NOV 14,1974 15 05 NOV 14,1974 15 06 NOV 14, 1974 15 07 NOV 14, 1974 15 08 NOV 14, 1974 15 09 NOV 14,1974 15 10 NOV 14, 1974 15 11 NOV 14,1974 15 12 NOV 14,1974 15 13 NOV 14, 1974 15 14 NOV 14,1974 15 15 NOV 14, 197" 15 16 NOV 1 4 , 1 9.7 « 15 20 NOV 14, 1974 15 26 NOV 14,1974 15 27 NOV 14,1974 15 41 NOV 14, 1974 END SHUT IN 20 POINTS REPORTED THIS RUN PAGE 2 II B-391 # JOB NUMBER SPG-11210-B GAUGE/RUN NUMBER 196 RUN NO, 2 DST NO, DATE OF JOE Xl-14-74 JO 11-15-7H) DATE OF RUM SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA TIKE ,000 ,017 ,033 e050 ,067 ,06a ,100 « 117 ,13a ,150 ,167 ,16 DATE OF RU, I i- 1 8 - 7 i SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT. DELTA PRESSURE TIKE (PSI) 1, ,503 113.990 1, ,570 116*977 1, ,637 119,660 1, ,704 122,431 1, ,771 125.537 1, ,637 I28e975 1, ,90^ 131.987 1, ,971 135.2U 2, 038 137,416 2, ,155 141.922 2, t2B2 144,293 2, 266 146,593 2, ,355 148,490 2, ,422 150,244 2, ,469 151.951 2, ,556 153,659 2, ,623 155.390 2, ,669 1561978 2 ,823 160^03 2, ,957 163J404 3 ,090 166J818 3 ,224 170,043 3 ,358 173.932 3( ,491 175.924 3, ,625 178.342 3( ,758 180 I 879 3 ,892 183.345 a ,026 185^669 4 ,1^9 187J518 4 ,293 189^012 4, ,427 190.316 a ,560 191,573 4 ,694 192.925 4 ,826 194 I 2? 6 a ,961 195,485 5 ,095 196.742 S ,228 197^880 5 ,379 199.113 5 ,512 200.299 5 ,646 20U413 TIME DATE COMMENTS HR MIN 17 15 NOV 14, 1974 17 19 NOV 14, 1974 17 23 NOV 14, 1974 17 27 NOV 14, 1974 17 31 NOV 14, 1974 17 35 NOV 14, 1974 17 39 NOV 14, 1974 17 43 NOV 14, 1974 17 47 NOV 1 4, 1974 17 54 NOV 14, 1974 17 58 NOV 14, 1974 16 02 NOV 14, 1974 16 06 NOV 14, 197 4 16 10 NOV 14, 1974 16 14 NOV 14 , 1974 18 18 NCV 14, 1974 16 22 NOV 14 , 1974 16 26 NOV 1 4, 1974 18 34 NOV 1 /I 197 4 18 42 NOV 14, 1974 t 18 50 NOV 1 4, 1974 18 58 NOV 14, 1974 19 06 NOV 14, 1974 19 14 NOV 14, 1974 19 22 NOV 14, 1974 19 31 NOV 14, 1974 19 39 NCV 14, 1974 19 47 NOV 14, 1974 19 55 NOV 14, 1974 20 03 NOV 14, 1974 20 11 NOV 14, 1974 20 19 NOV 14, 1974 20 27 NOV 14, 1974 20 35 NOV 14, 1974 20 43 NOV 1 4 t 1974 20 51 NOV 14, 1974 20 59 NOV 14, 1974 21 08 NOV 14, 1974 21 16 NOV 14, 1974 21 24 NOV 14, 1974 PAGE 3 11 B-393 JOB SPG« NUMBER ■U210-B GAUGE/RUN NUMBER 196 RUN NO, 2 DST NO, 5 SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE DATE OF JO: il-14-74 TO 11-15-7^ DATE OF RUN 11-18-74:; REPORT DELTA TIME 5,760 5,913 6,047 6,161 6,31« 6,448 6,582 6,715 6,649 6,962 7,116 7,250 7,383 PRESSURE (PSI) 202.504 203.618 204.638 205,681 206.582 207,714 208.598 209,475 211,111 214,692 216,731 217,608 218,106 TIME DATE COMMENTS MR MIN 21 32 NOV 14,1974 21 40 NOV 14,1974 21 48 NOV 14,1971 21 56 NOV 14,1971 22 04 NOV 14,1974 22 12 NOV 14,1971 22 20 NOV 14,1971 22 28 NOV 14,1971 22 36 NOV 14,1974 22 44 NOV 14, 1971 22 52 NOV 14,1971 23 00 NOV 14,1971 23 08 NOV 14,1974 END FLOW 93 POINTS REPORTED THIS RUN PAGE 4 II B-394 # SPG< GAUG 196 NUMBER •11210-0 E/RUN NUMBER RUN NO, 2 D°- *T NO, 5 DATE OF JOE 11-14-74 TO 11-15-74^ DATE OF RUN;„ 11-18-74* SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT ELTA PRESSURE IKE (PSI) ,000 218, 106 ,017 228,824 c033 206j748 ,050 165,503 ,066 175.497 ,063 193,731 .100 200,014 .life 202,172 ,133 187,827 i 149 167,127 ,166 161.389 ,162 154,621 ,199 151,714 ,216 I50e268 ,232 150.078 ,249 149,936 ,315 15 0,0-0 7 ,332 156.125 ,346 158 ,2*35 ,365 156,604 ,361 158,662 ,398 158,306 ,415 158.045 ,531 157.690 ,663 156,812 ,680 135,211 ,697 128,311 .713 128,359 ,730 129,449 ,746 131,014 .763 133.457 .779 134,879 ,796 136.017 ,813 136,647 ,629 137,748 ,846 138,555 ,862 139,432 ,879 140,238 1,012 146,759 1,144 151,833 TIME DATE COMMENTS HR MIN 23 08 NOV 14,1974 START AIR 23 09 NOV 14,1974 INJECTION 23 10 NOV 14,1974 23 11 NOV 14, 1974 23 12 NOV 14,1974 23 13 NOV 14,1974 23 14 NOV 14,1974 23 15 NOV 14,1974 23 16 NOV 14,1974 23 17 NOV 14,1974 23 18 NOV 14,1974 23 19 NOV 14,1974 23 20 NOV 14,1974 23 21 NOV 14,1974 23 22 NOV 14,1974 23 23 NOV 14,1974 23 27 NOV 14,1974 23 28 NOV 14,197^ 23 29 NOV 14,1974 23 30 NCV 14,1974 23 31 NOV 14, 1974 23 32 NCV 14,1974 23 33 NOV 14,1974 23 40 NOV 14,1974 23 48 NOV 14,1974 23 49 NOV 14, 1974 23 50 NOV 14,1974 END AIR 23 51 NOV 14,1974 INJECTION 23 52 NOV 14, 1974 23 53 NOV 14,1974 23 54 NOV 14,1974 23 55 NOV 14,1974 23 56 NOV 14,1974 23 57 NOV 14,1974 23 58 NOV 14,1974 23 59 NOV 14,1974 00 00 NOV 15,1974 00 01 NOV 15,1974 00 09 NOV 15,1974 00 17 NOV 15,1974 PAGE 2 1 I B-395 JOB NUMBER SPG-11210-3 GAUGE/RUN NUMBER 196 RUN NO, 2 DST NO. 5 DATE OF JO il«*14-74 TO 11-15-74] r DATE OF RUi 11-18-7;: SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA PRESSURE TIME (PSI) 1, ,277 155.461 1, ,410 157;879 1, ,542 160.891 1, ,675 164.732 i, ,808 168p644 1, ,940 172.462 2, ,073 175.758 2, ,20b 178.793 2, ,338 181.757 2, ,471 184.151 2, ,488 189.913 2, ,504 196.007 2, ,521 202,267 2, ,537 208,906 2 ,55^ 215,308 2 ,571 221,758 2 ,567 228.089 2 ,604 234,254 2, ,620 240.300 2, ,637 246.3*23 2, ,653 252.013 2, ,670 258,131 2, ,667 263,727 2, ,703 270,081 2, ,720 272.405 2, ,736 272,500 2, ,753 272,595 2, ,770 272,547 2, ,786 272.358 2, ,803 271 s860 2, ,819 271,812 2, ,836 2713457 2, ,852 271,528 2, ,869 271,077 2 ,886 279.400 2, ,902 290.544 2 ,919 302^803 2 ,935 312.999 2 ,952 326,346 2 ,969 336,449 TIME DATE HR KIN 00 25 NOV 15, ,1974 00 33 NOV 15, , 1974 00 41 NOV 15, , 1974 00 49 NOV 15, , 1974 00 56 NOV 15, , 19/4 01 04 NOV 15, , 1974 01 12 NOV 15, .1974 01 20 NOV 15, .1974 01 28 NOV 15, , 1974 01 36 NOV 15, r 1974 01 37 NOV 15, , 1974 01 38 NOV 15, ■ 19 7 4 01 39 NOV 15, . 1974 01 40 NOV 15, , 1974 01 41 NOV 15 t 1974 01 42 NOV 15, , 1974 01 43 NOV 15 >1974 01 44 NOV 15 . 1974 01 45 NOV 15, . lc>74 01 46 NOV 15 .19 7 4 01 47 NOV 15, - 1974 01 48 NOV 15, . 1974 01 49 NOV 15, . 1974 01 50 NOV 15, - 1974 01 51 NOV 15, F 1974 01 52 NOV 15, , 1974 01 53 NOV 15, , 1974 01 54 NOV 15, r 1974 01 55 NOV 15, - 1974 01 56 NOV 15, , 1°74 01 57 NOV 15, r 1974 01 58 NOV 15, . 1Q74 01 59 NOV 15, . 1^74 02 00 NOV 15, . 1974 02 01 NOV 15, .19/4 02 02 NOV 15, . 1074 02 03 NOV 15, , 1°74 02 04 NOV 15, , 1074 02 05 NOV 15, . 1974 02 06 NOV 15, , 1°?4 COMMENTS START 5 GAL. MIN, INJECTION END 5 GAL. MIN, INJECTION START 10 GAL, MIN, INJECTION PAGE 3 1 I B-396 JOB NUMBER spG-naio«B GAUGE/RUN NUMBER 196 RUN NO, 2 DST NOp 5 DATE OF JO£ U-14-74 TO 11-15-7^ r DATE OF RUf H-18-74 SPERRY~SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA TIME 985 002 Olfl 035 051 068 065 101 118 134 151 166 16U 201 217 23a 250 267 2Ba 300 317 333 350 PRESSURE (PSI) 349,301 360,825 371,627 383,113 393.712 405,900 409.575 409.599 408,319 a 0 6 , 9 a 3 405.781 404, an 403,339 402.272 401 .656 400,683 400,067 399,261 398,5,73 397,814 396.890 396.060 395, 420 TIME DATE COMMENTS HR MI'N 02 07 NOV 15, 1974 02 08 NOV 15,1974 02 09 NOV 15,1974 02 10 NOV 15, 1974 02 11 NOV 15,1974 02 12 NOV 15,1974 02 13 NOV 15,1974 02 14 NOV 15,1974 END 10 GAL, 02 15 NOV 15, 1974 MINI, INJECTION 02 16 NOV 15,1^74 02 17 NOV 15,1974 02 18 NOV 15,1974 02 19 NOV 15,1974 02 20 NOV 15, 1^74 02 21 NOV 15, 1974 02 22 NOV 15, 1974 02 23 NGV 15, 1974 ' 02 24 NOV 15,1^74 02 25 NOV 15, 1974 02 26 NOV 15, 1974 • 02 27 NOV 15, lf>74 02 26 NOV 15, lu74 02 29 NOV 15,1^74 END TEST ♦ 103 POINTS REPORTED THIS RUN PAGE 4 II B-397 JOB NUMBER SP6-U210-B DATE OF JC ti»lfl«74 TO 1 1-15-7 3 f SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT PREPARED FOR ATLANTIC RICHFIELD COMPANY WELL NUMBER FEDERAL SG-17 PIELD/'LEASE SORGHUM GULCH 4 COUNTY/PARISH RIO BLANCO STATE COLORADO TYPE OF TEST DRILL STEM REFERENCE ELEV GROUND LEVEL ADDITIONAL INFORMATION USED GAUGE NO. 204 WITH 1000 LB, ELEMENT GAUGE TEST DEPTH IS 875,49 FEET GAUGE IS IN ANNULUSi WITH PACKER SET AT 919 FEET ♦ 18 POINTS REPORTED THIS JOB PAGE 1 OF 2 PAGES I i B-398 J03 NUMBER EPG«11210«B GAUGE/RUN NUMBER 2Q4 RUN NOe 2 DST NOc 5 DATE OF JC U-14-74 TO i 1-15-7 SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT : DATE OF RU/ 1 1-1S«.7 DELTA PRESSURE TIME cpsn 0,000 165e775 ,567 169,366 1,567 189,275 2,567 189. 549 3,567 189,823 4,567 I90t166 5,567 190,486 6,567 190,783 7,567 191,060 8,567 191.560 9,567 191.538 10,567 191.743 11.567 192,109 11.617 192.178 11,633 192.521 11,650 192.909 12,000 192.452 12,350 179.633 TIME HR MJN DATE 15 15 16 17 18 19 20 21 22 23 00 01 02 02 02 02 03 03 05 39 39 39 39 39 39 39 39 39 39 39 39 42 43 44 05 26 NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV 14 14 14 14 14 14 14 14 14 15 15 15 15 15 15 15 15 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 COMMENTS INIT, HYDRO. FINAL HYDRO. 18 POINTS REPORTED THIS RUN PAGE 2 II B-399 PRESSURE GAUGE DRILL STEM TEST SHEET Job UoSRl'l^lO'S Date/'-W--7V Run Z PST^S" Office C^?£^ I Location TPfcT £~ b ViC£f)h^£ G?£E {'&&*'! Customer AR?0 B^lfiL state Color Pi vo We 1 1 flVc.p.A L ^C^ No . County/Parish ^10 ^Slr)h\Qf) J2 Field Z9g&W0r\ (SllLChf USE MILITARY TIME FOR ALL TIMES Time Date Time Arrive: Well/Dock 1 JO 00 //-/4-7V 2. Date Time Charged Depart: Well/Dock 1. 0£pO> Gauge Start in Hole 1. I [32 O //"/J.7V2. •? ii Gauge Out of Hole 1. OSZB /!-/£-/ No. Trips I Miles *£> Krs. Hrs, Total Mileage ' f /■ Z; Top Gauge if 2 $ rf Element i? 3 Z7 {~ / Range /O ^ .^ Time Mode / H ■'/■ , Btm. Gauge // />7£ Element fl .3^ v £" / Range I 0 O tO Time Mode / ^ '-'• ■ Zero Point-?'/ 2W- Type Tool \ T- -/i-. y/' //r/Tcst Depth ^7/-7- Tail Pipe Depth "/ / - Top Gauge Depth ? -7 Jr , U-l <7 ' i ''-' £T / ►- r r- Bottom Hole Temp. ^ < f" Atrr.os. Temp. u" — f*~ /? ; Bottom Gauge Depth ' & On Bottom Packer Set TIME INFORMATION Time Date / — !*i-~0 Initial Open /£Qf*/SOZ. //~/ti-ytJ Initial Shut-in /5Cj- / ~.y/ t/-/J.~?a Start Flow / S.C / //- /±/~V^ Final Shut-in PRESSURE INFORMATION Initial Hydrostatic Mud //•' ■£. " £ / O -^> J. , '/■/;/ Initial Draw Down / Or- r'/ ' /,«, O * "- .•__■_.— Initial Build-Up J/A/S^S ~z /,' SO - -V-1 ~ /','■ >'■ ^2^ A" 7"^ ^2 /•'/ Packer Unseated C'J&±} //■'£'■/" Final Flow Final Build-Up Final Hydrostatic Mud Mud Weight Pa > ; , y /- 7 1 *77 ? id 7 7 - ^ sy TIME OF SURFACE NULLS Bottom Gauge / / £°Q Top Gauge /Z.Q Oh'^t Rcuiarks^/'V//;' UVr.i- !<=> ff 0 ^T . rk!~r'?/ f^'-'/'V T'lt-i-P- ^Q.-OO 'TrLh'< nO J . SP-423 II B-400 7?4tL//&*nC'f.'\\ Operator // J0H1 .' 5T0 • - ; ♦ m n n f - i . ' 3 . J & n B-401 F.R. TO017 C LU CC ID in c/) * mo rco o r\ s t* •^ ^ a V, ^ vs i I 11 B-402 Page 1 ^i ■ HUSTON ..found a bsitsr way SURFACE [['POTATION ^ iplion (Rote of Flow) Opened Tool Time 1316 Pressure (P.S.I. G.) Surfoce Choke CLOSED FOR INITIAL SHUT-IN 1322 - - F 1 N ISHED SHUT- 1 N 1352 - - RE-OPENED TOOL 1402 - - 1 NJECT 1 NG AIR 1634 - - STOPPED INJECTING AIR 1717 - - STARTED INJECTING WATER 5 GAL. /m IN. 1834 - - STOPPED INJECTING WATER 1849 - - STARTED INJECTING WATER 10 GAL. /M 1 N. 1903 - - STOPPED INJECTING WATER 1914 - - STARTED INJECTING WATER 20 GAL. /M 1 N. 1929 - - STOPPED INJECTING WATER 1944 - STARTED INJECTING FILL-UP 1954 _ _ STOPPED INJECTING FILL-UP 2011 _ _ FILLED ANNULUS 2021 _ _ STOPPED FILLING ANNULUS 2036 _ _ CLOSED FOR FINAL SHUT-IN 2103 - - PULLED PACKER LOOSE 2120 - - A w Cushion Type Amount Pretiur* Bottom Choke 3/4" Sue ' MUD DATA w,.^ Typ- WATER FOAM wt. Vif<-/->«i»y ~ Wnter Ln k - r r Resist: of Mud - (a) ~ °F; of Filtrate (S> °F Chlorido Content ~ PPM EQUIPMENT & HOLO DATA Typn Telt M.F.E. OPEN HOLE Formntion Tested - Elevation - Ft Net Productive Interval - Ft. Estimated Porosity - % All Depths Measured From - Total Depth 1017 Ft. Main Hole/Casing Size - Rat Hole/Liner Size - Drill Collar Length Drill Pipe Length _ Packer Depth(i) 326 I.D. 505' I.D..- 961 & 967 MULTI-FLOW EVALUATOR FLUiD SAMPLE DATA Sampler Pressure Recovery: Cu. Ft. Ga» cc. Oil cc. Water cc. Mud Tot. Liquid cc. . Gravity P.S.I.G. at Surface 'API @ •f. Got/Oil Ratio— 1 ft./bbl. Recovery Water Recovery Mud Recovery Mud Filtrate Mud Pit Sample Mud Pit Sample Filtrate RESISTIVITY @ CHLORIDE CONTENT (a) @ _@ ppm ppm ppm RECOVERY DESCRIPTION FEET BARRELS % OIL % WATER % OTHERS API GRAVITY @ °F. RESISTIVITY @ °F. CHI. PPM @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. Rpmnrkfti 1500 SECURITY LIFE BUILDING , 1616 glenarm; denver, Colorado 80202 ATLANTIC RICHFIELD COMPANY fj^M SORGHUM GULCH Well . Tost Interval County .... federal s-g //17 967' to 1017' RIO BLANCO > LfU4 12 18(.. l 10 215.1 14 186. ! 11 217.3 LI 186.1 i; 218.4 CON' r 1 N U F. D Page 3 ...found e bettor i \ / PRESSURE DATA ^■Instrument No. J- 029 Field Report No. 1 06017 C ^ Capacity (P.S.I.G.) • Instrument Depth TIME DATA Time Given Time Computed Mins . Mins. Instrument Opening Pressure Gradient P. S.I. /Ft. Well Temperature F. Initial Hydrostatic Mud A Initial Shut-in B Initial F low C Mins. Mins. Mins. Mins. Mins . Mins. Final Flow D Mins. Mins. F inal Shut-in E Mins. Mins. Final Hydrostatic Mud F Remark s: Shut in pressure did not reach static reservoir pressure. Clock Travel inches per min. PRESSURE INCREMENTS Point Minutes Pressure T + A At t Point Minutes Pressure T + At At ii Point Minutes i Pressure T + At \t 186. 80 222.4 60 326.1 20 186.1 86 222.4 62 344.2 22 186.1 228.6 64 349.9 12 24i 186.1 230.9 66 370.3 25 1 179.3 232.0 68 386. 1 26! 182.2 232.6 20 69 386. 1 28! 189.5 10 232.6 70 367.4 30 189.5 12 232.6 72 345.9 32 189.5 14 232.6 74 328.3 34 189.5 If, 232.6 76 331.2 36 189.5 16 232.6 300.0 38 189.5 20 228.6 21 79 298.3 40 189.5 22 228.1 80 337.4 13. T4~ 41 42 189.5 24 227.5 82 377.1 187.8 17 25 227.5 84 390.7 43 170.3 26 237.7 86 392.9 1 186.1 28 251.3 88 395.8 201.4 30 259.8 90 398.0 206.'. 32 267.7 92 399.2 210.5 34 275.7 94 399.2 213.9 y, 285.9 22 95 399.2 216.2 38 296.6 96 378.2 217.9 Vci 219.0 40 4? 297.7 98 358.9 274.0 100 341.9 219.6 10 30 220.1 44 46" 261.5 102 326.6 253.0 104 220. 7 48 M> 246.8 241.7 106 4" ; 0 I 70 222.4 .■■ .4 52 238.3 19 54 56 236.6 M B-405 108 110 313.6 301 . i 291.5 282.5 274.5 58 303.4 ll,' 114 CONT 274.0 266.6 NUED < Page 4 ...found a bcx:,;r PRESSURE DATA ^fc Instrument No. J-029 Field Report No. 06017 C ■ Copacity (P.S.I.G.) • Instrument Depth TIME DATA Time Given Time Computed M i n s . M i n s . Instrument Opening Pressure Gradient P. S.I. /Ft. Well Temperature F. Initial Hydrostatic Mud A Initial Shut-in B Initial F low C Mins. Mins. Mins. Mins. Mins. Mins. Final Flow D Mins. Mins. Final Shut-in E Mins. Mins. Final Hydrostatic Mud F Remarks: I 'Shut in pressure did not reach static reservoir pressure. Clock Travel inches per min. PRESSURE INCREMENTS Point Minutes Pressure T + A At t Point Minutes Pressure T + At At Point Minutes | Pressure- T + At At 4 116 260.9 118 255.8 120 251.3 122 247.3 124 243.9 126 241.1 128 238.8 130 236.6 132 234.9 134 233.7 136 138 232.6 231.5 23 139 229.8 140 228.6 14? 228. fc — 144 146 228.6 228.6 148 228.6 24 150 152 154 228.6 228.6 228.6 156 228.6 a • I I B-406 , • I Page 5 i ...found a bziter way < . PRESSURE DATA 1 L— ^ Instrument No. J-405 Field Report No. W Copacity (P.S.I.G.) - 2800 06017 C Instrument Depth 985 • TIME C Time Given Mins. Instrument Opening OUTS IDE Pressure Gradient P. S.I. /Ft. )ATA Weli Temperature F. 87 Initial Hydrostatic Mud A Time Computed Initial Shut-in B Min s. Initial Flow C Mins. Mins. Mins. Mins. Mins. Mins. Final Flow D Mins. Mins. F ina 1 Shut-in E Mins. Mins. Final Hydrostatic Mud F Remarks: Shut in pressure did not reach srofi c reservoir pressure. Clock Travel inches per min. PRESSURE INCREMENTS PO 1 NTS Point Minutes Pressure T + A At Point t Minutes Pressure T + At At Point ! Minutes Pressure 1 T+ At At • 1 228.9 : 4 0 62.1 131 231.1 2 237.9 2 229.4 14 231.7 i 3 47.4 4 230.5 15| 232.2 ! 4 62.1 6 230.5 16 232.2 5 231.7 8 230.5 17 232.8 6 237.3 10 230.5 18 232.8 7 92.6 12 230.5 19 233.4 8 240.2 14 230.5 20 233.4 9 252.6 16 230.5 30 233.9 10 205.1 18 230.5 40 234.5 11 203.4 20 230.5 50 235.1 12 197.8 22 230.5 60 235.1 13 204.6 24 230.5 70 235.6 14 187.6 | 26 231.1 80 235.6 15 233.9 28 231.1 90 236.2 16 245.8 30 231.1 100 236.8 17 241.9 32 231.7 110 237.3 18 309.1 34 231.7 120 238.5 19 20 249.8 5 35 231.7 130 239.6 vi 8. 4 7 0 92.6 140 240.2 21 313.1 1 131.6 150 240.2 22 413.7 2 161.6 b 153 240.2 247.5 3 176.9 9 1 252.6 24 245.8 4 189.9 10 2 205.1 25 228.9 5 200.0 4 203.4 « 6 208.5 6 203.4 7 214.7 8 G.4 8 0.4 H B-407 10 203.4 9 223.8 12 203.4 10 26.6 14 . 03.4 11 228.9 16 ZQQsA 12 230.0 CON i NUED 0 4 Page: 6 era -- - ...found a Lsiior way i PRESSURE DATA ^L Instrument No. J- 405 ^ Copacity (P.S.I.G.) Field Report No. 06017 C Instrument Depth Instrument Opening TIME DATA Time Given Time Computed Pressure Gradient P. S.I. /Ft. Well Temperature F. Initial Hydrostati c Mi ;d A Initial Shut-in B u ins. Mins. Initial F low C w ins. ins. ins . ins. ins. Mins. w Mins. N Mins. Final F low D V Mins. Final Shut-in E rV Mins. Final Hydrostatic Mu d F I Remark s: Shut in pressure did ni 3f reach static reservoir pressure. Clock Travel inches per min. PRESSURE INCREMENTS Point Minutes Pressure '^.„. _ T + A t Po Mint int T + At Point T + Ai \» tes Pressure At Minutes Pressure | At ♦ 18 203.4 80 i 233.9 60 334.0 20J 203.4 15 86 233.9* i 62 353.2 22 203.4 2 240.2 64 356.0 11 24 203.4 4 242.4 66 375.2 12 25 197.8 6 243.5 68 392.2 26 203.4 •8 244.7 20 69 398.4 28 205.1 10 244.7 70 393. , 3 30 205.1 12 245.2 72 368. J 32 205.1 14 245.8 l 74 348.7 34 205.1 16 245.8 76 332.9 36 204.6 16 18 245.8 78 319.9 38 204.6 20 243.0 21 79 313.1 40 204.6 ?? 242.4 80 339.6 13 41 204.6 24 241.9 82 373.5 42 187.6 17 25 241.9 84 399.5 14 43 187.6 26 246.4 86 405.8 1 209.1 28 261.1 88 407.5 2 217.0 30 270.1 90 412.0 3 221.5 3? 278.0 92 413. 1 4 225.5 35 285.4 94 413.7 5 228.3 36 293.9 ?? 95 413.7 6 7 230.5 38 305.2 96 402.4 231.1 18 40 309.1 98 382.6 8 232.2 42 291.0 100 363.9 9 232.8 44 278.6 102 34 f.5 ▼ 10 232.8 46 i 104 334.0 20 232.8 48 261.6 100 30 233.4 50 250.0 I I B-408 108 310.8 40 233.9 52 252.0 110 300. 6 50 1. 9 19 54 49.8 112 233. I 279.2 114 5.4 70 233,9 58 311.4 COM r I NUED I Page 7 ...found s better way PRESSURE DATA ^^ Instrument No. J-405 Copacity (P.S.I.G.) F ield Report No. 06017 C Instrument Depth Instrument Opening TIME DATA Time Given Time Computed Pressure Gradient P. S.I. /Ft. Well Temperature F. Initial Hydrostatic Mud A Initial Shut-in B Mins Mins. Initio 1 F low C Mins Mins. Mins Mins. Mins Mins. Final Flow D Mins Mins. Final Shut-in E Mins Mins. Final Hydrostatic Mud F Remark s: Shut in pressure did not reach sfofic reservoir pressure. Clock Travel inches per min. PRESSURE INCREMENTS Point ,^inutes Pressure T + At Point 1 T+At Af Minutes Pressure At Point Minutes Pressure T + At At 116: 279.2 118 273.5 ♦ 120 269.0 122 265.0 124 261.6 126 258.8 128 256.0 130 253.7 132 252.6 134 250.3 136 249.2 138 248.1 23 139 247.5 140 142 245.8 245.8 1AA 245.8 146 5.8 148 150 245.8 245.8 152 245.8 154 24 156 245.8 245.8 % w i i u /ino 1 J n hUJ . > i TLB ...found a better way GUIDE TO IDENTIFICATION OP DRILL STEM TEST PRESSURE CHARTS johnston FIELD REPORTS REPORT NO. RECORDER NO. CAPACITY REQUESTED B-l / -\ C-l ^ A. Initial Hyd. Mud B. Initial Shut-in C. Initial Flow D. Final Flow E. Final Shut-in F. Final Hyd. Mud The following points are either fluctuating pressures or points indicating other packer settings, (testing different zones). A-l, A-2, A-3, etc. Initial Hyd. Pressures B-l, B-2, 8-3, etc. Subsequent Shut-in Pressures C-l, C-2, C-3, etc. Flowing Pressures D-l, D-2, D-3, etc. Subsequent Final Flow Pressures E-l, E-2, E-3, etc. Subsequent Final Shut-in Pressures F-l, F-2, F-3, etc. Final Hyd. Mud Pressures Z — Special pressure points such as pumping pressure recorded for formation breakdown. UiSBLT^Mu^.j.;^;,^, •. .„-._■„ :^.-j..„!<-^!±.:.i:.i.^:. .. > % U-U JOi-SPJSTOIU ...found c better way GUIDE TO IDENTIFICATION OF DRILL STEM TEST PRESSURE CHARTS JO LSI " - i . . . .. TON FIELD REPORTS REPORT NO. RECORDER NO. CAPACITY REQUESTED A. Initial Hyd. Mud B. Initial Shut-in C. Initial Flow D. Final Flow E. Final Shut-in F. Final Hyd. Mud The following points are either fluctuating pressures or points indicating other packer settings, (testing different zones). A-l, A-2, A-3, etc. Initial Hyd. Pressures B-l, B-2, B-3, etc. Subsequent Shut-in Pressures C-l, C-2, C-3, etc. Flowing Pressures D-l, D-2, D-3, etc. Subsequent Final Flow Pressures E-l, E-2, E-3, etc. Subsequent Final Shut-in Pressures F-l, F-2, F-3, etc. Final Hyd. Mud Pressures Z — Special pressure points such as pumping pressure recorded for formation breakdown. FIELD REPORT NO. RECORDER NO. -YC&&& 06017 C CAPACITY 2800,? J-405 REPORTS REQUESTED 14+ ry- V-.,. Sk \ i n 1 I ■ n p 1 II B-411 ' ' (?) \ i 4 : s ^uZaCX^ui . t^U^i.'.h,l.„ :g.AW*rxv.r ■..- , .. — *,*./*.« . . •<* 4 i-w-**^.' k'twi>*JJi<*<»\tJi*'*.-*j»JLjr."*^-. ■. ... .MJ.J t I POST OFFICE BOX 36363 HOUSTON, TEXAS 77036 (713) 494-3021 j. a. Fouche November 21, 1974 President Mr. F. C. Witmer Atlantic Richfield Company 1500 Security Life Building Denver, Colorado 80202 Dear Sir: Enclosed is the original of our Precision Pressure Gauge Drill Stem Test job SPG-11210-C performed on your Federal SG-17 Well, Tract C-b, Piceance Creek Basin, Sorghum Gulch, Rio Blanco County, Colorado on November 16, 1974. Test interval was 0-967 feet and 967 feet to 1,017 feet.^ Also enclosed is the chart for gauge No. 196 and No. 204 with Field Data Sheet. Distribution is also being made according to the attached mailing list. Thank you for this opportunity to be of service. Very truly yours, SPERRY-SUN Carl Kisinger, Jr. Manager Pressure Services CK:jg Enclosure ' /' '7 II B-412 « JOB NUMBER 8PG»11210«C DATE OF JO- U«i6-7< SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT PREPARED FOR ATLANTIC RICHFIELD COMPANY WELL NUMBER SGcl7 FIELD/LEASE TRACT C-B SORGHUM GULCH COUNTY/PARISH RIO BLANCO STATE COLORADO TYPE OF TEST DRILL STEM REFERENCE ELEV GROUND LEVEL ADDITIONAL INFORMATION USED GAUGE NO, 196 WITH 1000 LB, ELEMENT GAUGE TEST DEPTH IS 1006,98 FEET ^GROUND LEVEL REFERENCE IS 7036 FEET INITIAL HYDROSTATIC IS 243,12 FINAL 6YDR0STATIC IS 244,38 < TEST INTERVAL 967 TO 1017 FEET 235 POINTS REPORTED THIS JOB PAGE 1 OF 6 PAGES I I B-413 < JOB NUMBER •8P6-U210-C GAUGE/RUN NUMBER 196 RUN NOe 3 D5T 6 DATE OF JO; DATE OF RUij SPERRY«SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA PRESSURE TIME CPSI) 0,000 84e493 e017 193,517 ,033 194,513 ,050 197,264 ,067 198,117 ,083 198,544 ,100 198,734 ,117 198.829 .133 198;876 ,167 198,971 .233 198,995 ,367 199s066 ,500 199,090 ,600 1998184 TIME DATE COMMENTS HR MXN 13 17 NOV 16,1974 SHUT-IN 13 18 NOV 16,1974 13 19 NOV 16,1974 13 20 NOV 16,1974 13 21 NOV 16,1974 13 22 NOV 16, 1974 13 23 NOV 16, 1974 13 24 NOV 16, 1974 13 25 NOV 16, 1974 13 27 NOV lb, 1974 13 31 NOV 16, 1974 13 3 9 NOV 16,1974 13 47 NOV 16, 1974 13 53 NOV 16,1974 END 14 POINTS REPORTED THIS RUN PAGE 2 II H-414 i 4 JOB NUMBER 3PGMJ21Q-C GAUGE/RUN NUMBER 196 RUN NO, 3 DST NOB 6 DATE OF JC 1W6-?; DATE OF RU, SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA PRESSURE TIME (PSI) 0, ,000 130,730 ,017 157*950 ,033 193,992 050 208.645 067 219,837 ,063 228.63a ,100 235.392 ,117 241.035 ,133 244,876 ,150 247.816 ,167 249.903 ,163 251,160 ,200 252.013 ,217 252.606 ,233 252.985 ,250 253.223 ,267 253.412 ,263 253,555 ,317 253.721 ,363 253,839 ,517 254,029 ,763 254.242 l! ,050 254,364 i, ,317 254,527 t, ,563 254.598 i, ,783 254s669 1, ,817 254,740 1, ,650 254.930 1, ,963 254,906 2, |267 254.882 2 [533 254,788 2 ,550 262,304 2 ,567 236,008 2 ,583 215.806 2 ,600 216,557 2 ,617 219,861 2 ,650 219,410 2 ,717 218,983 2 ,633 216,082 2 r900 218e130 TIME DATE COMMENTS HR MIN 14 03 NOV 16, 1974 FLOW 14 04 NOV 16, 1974 14 05 NOV 16, rl974 14 06 NOV 16, 1974 14 07 NOV 16, 1974 14 08 NOV 16, -1974 14 09 NOV 16, , 1974 14 10 NOV 16, , 1974 14 11 NOV 16, ,1974 14 12 NOV 16, .1974 14 13 NOV 16, . 1974 14 14 NOV 16, ,1974 14 15 NOV 16, , 1974 14 16 NOV 16, , 1974 14 17 NOV i'6, ,19 7 4 14 18 NOV 16, r 1974 14 19 NOV 16, . 1974 14 20 NOV 16, , 1974 14 22 NOV 16, , 1974 14 26 NOV 16, , 1974 14 34 NOV 16, , 1974 14 50 NOV 16, ,1974 15 06 NOV 16, , 1974 15 22 NOV 16, , 1974 15 38 NOV 16, ,1974 15 50 NOV 16, ,1974 . • 15 52 NOV 16, , 1974 15 54 NOV 16, , 1974 16 02 NOV 16, , 1974 16 19 NOV 16, , 1974 16 35 NOV 16, , 1974 START AIR 16 36 NOV 16, , 1974 16 37 NOV 16, , 1974 16 38 NOV 16, , 1974 16 39 NOV 16 , 1974 16 40 NOV 16 r 1974 16 42 NOV 16 >1974 16 46 NOV 16 t 1974 16 53 NOV 16 ,1974 16 57 NOV 16, » 1 9 7 a PAGE 3 II K-415 I i JOB NUMBER SPG»U210»C GAUGE/RUN NUMBER 196 RUN NOE 3 DST NO DATE OF JO: i i « i 6 -* 7 ^ DATE OF RUf: ii«21-7< SPERRY»SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA TIME 950 967 963 000 017 067 233 250 267 263 300 317 333 350 367 363 400 417 433 450 467 463 500 517 533 550 567 563 600 617 633 650 667 663 700 717 733 750 767 763 PRESSURE (PSI) 2i89367 212,012 220,311 219,979 218,462 217.727 217,645 201,081 204.638 244 495 545 387 445 030 453 614 326 776 132 753 219 233 238 24 2 245 248 249 250 251 251 252 251 252.274 251.942 252.345 252,084 252,468 252,132 252,464 252,440 252,322 252.630 252,511 252,772 252,677 252.796 252,820 252,701 252,985 252,938 253e057 TIME DATE COMMENTS HR MIN 17 00 NOV 16, 1974 17 01 NOV 16, 1974 17 02 NOV 16, 1974 17 03 NOV 16, 1974 17 04 NOV 16, 1974 17 07 NOV 16, 1974 17 17 NOV 16, 1974 17 18 NOV 16, 1974 17 19 NOV 16, 1974 17 20 NOV 16, 1974 17 21 NOV 16, 1974 17 22 NOV 16, 1974 17 23 NOV 16, 1974 17 24 NOV 1,6 , . 1974 17 25 NOV 16, 1974 17 26 NOV 16, ,1974 17 27 NOV 16, < 197 4 17 28 NOV 16, , 1974 17 29 NOV 16 - 1974 17 30 NOV 16 t 1974 17 31 NOV 16 r 1974 17 32 NOV 16 » 1974 17 33 NOV 16, r 1974 17 34 NOV 16 f 1974 17 35 NOV 16 , 1974 17 36 NOV 16, r 1974 17 37 NOV 16 f 1974 17 38 NOV 16, f 1974 17 39 NOV 16 r 1974 17 40 NOV 16 r 1 9 7 4 17 41 NOV 16 f 1974 17 42 NOV 16 , 1974 17 43 NOV 16 rl974 17 44 NOV 16 t 1974 17 45 NOV 16 r 1974 17 46 NOV 16 t 1974 17 47 NOV 16 , 1974 17 48 NOV 16 , 1974 17 49 NOV 16 , 1974 17 50 NOV 16 r!974 PAGE II B-416 » • JOB SPGi NUMBER •U210-C GAUGE/RUN NUMBER 196 RUN NO, 3 DST NO$ 6 DATE OF JO 11*16-7.. i DATE OP RU' 1 1 - 2 i » 7 <: SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA TIME 3Bei7 PRESSURE CPSX) TIME HR MIN DATE COMMENTS 663 0i7 283 550 700 717 733 750 767 763 600 6J7 633 850 867 683 900 917 933 950 967 983 000 017 033 050 067 063 100 117 133 150 167 163 200 217 233 250 267 253, 253, 253, 254, 254. 254, 256s 259, 261, 262e 263. 263, 264, 264 264 265 265 265 265 265 265 264 261 259 258 257 256 256 255 255 256 264 274 280 285 290 294 298 302 305 246 721 053 171 313 684 340 166 257 087 822 272 675 960 149 410 553 718 861 837 225 403 506 202 254 542 187 902 736 021 936 017 633 707 141 054 345 021 933 17 17 18 18 18 18 18 16 18 18 18 18 18 18 16 18 18 18 18 16 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 52 56 04 20 36 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 START 5 GAL, MIN, INJECTION END 5 GAL, PER MIN, INJECTION START 10 GAL. MIN, INJECTION PAGE 5 11 R-417 r JOB NUMBER SPGMJ210-C GAUGE/RUN NUMBER 196 RUN NO, 3 DST NO, 6 DATE OF JC il-16-7- DATE OF RU li-21-7- SPERRY<*SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA TIME 283 300 317 333 350 367 363 400 417 433 450 467 463 500 517 533 550 567 563 600 617 633 650 667 663 700 717 733 750 767 763 600 817 633 650 867 663 900 917 933 PRESSURE CPSX) 310e106 315fi57 320,695 326,562 328^69 316,476 309,845 302 295 290 285 281 277 274 272 269 267 265 264 302 320 336 348 359 368 377 382 336 346 410 418 407 394 382 372 363 355 347 340 334 400 679 402 636 558 954 729 073 726 734 956 414 637 847 070 256 355 626 921 687 165 216 358 420 939 874 900 536 314 039 404 480 126 TIME DATE COMMENTS HR KIN 19 20 NOV 16, 1974 19 Hi NOV 16, 1974 19 22 NOV 16, 1974 19 23 NOV 16, 1974 19 24 NOV 16, 1974 END 10 GAL, 19 25 NOV 16, 1974 MIN, INJECTION 19 26 NOV 16, 1974 19 27 NOV 16, 1974 19 28 NOV 16, 1974 19 29 NOV 16, 1974 19 30 NOV 16, 1974 19 31 NOV 16, 1974 19 32 NOV 16, 1974 19 33 NOV 16, 1974 19 34 NOV 16, 1974 19 35 NOV 16, 1974 19 36 NOV 16, 1974 19 37 NOV 16, 1974 19 38 NOV 16, 1974 START 20 GAL. 19 39 NOV 16, 1974 MIN, INJECTION 19 40 NOV 16, 1974 19 41 NOV 16, 1974 19 42 NOV 16, 1974 19 43 NOV 16, 1974 19 44 NOV 16, 1974 19 45 NOV 16, 1974 19 46 NOV 16, 1974 19 47 NOV 16, 1974 19 48 NOV 16, 1974 19 49 NOV 16, 1974 19 50 NOV 16, 1974 END 20 GAL, 19 51 NOV 16, 1974 MIN, INJECTION 19 52 NOV 16, 1974 19 53 NOV 16, 1974 19 54 NOV 16, 1974 19 55 NOV 16, 1974 19 56 NOV 16, 1974 19 57 NOV 16, 1974 19 58 NOV 16, 1974 19 59 NOV 16, 1974 PAGE 6 II B-418 c JOB NUMBER 8P6-U2J0-C GAUGE/RUN NUMBER 196 RUN NO, 3 DST NO, DATE OF JO il-16"7' DATE OF RUl lt-21-7' SPERRY*SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA PRESSURE TIME (PSI) 5, 950 326, 103 5, 967 346, 503 5, ,983 363, 883 6, 000 402, 225 t>, ,017 416, ,262 6i ,033 424, 276 6, ,050 425, e89 6, ,067 426, 932 Gi ,083 427, 620 6« 100 427i ,714 *i 117 431, 840 6, ,133 432, ,599 6| ,150 432, ,338 bi ,167 433, ,524 6, ,163 434. ,045 b, ,200 424, ,750 6, ,217 414, ,057 6, ,233 403, ,647 b( .250 394, ,021 6, ,267 384, ,821 b, ,263 376, ,000 6, ,300 368, ,057 6, 317 360, ,374 6, 333 353, 047 6, ,350 346, 645 6i ,367 340. ,409 6, ,363 334, ,481 6, ,400 328, ,791 <>« ,417 323, ,4 32 6. ,433 318, ,453 6, ,450 313, ,781 6, ,467 309, ,608 6 ,463 305, .482 6 ,500 301, .783 6 .517 298, 1274 6 ,533 294 .955 6 ,550 291 ,672 6 ,567 289 [003 6 ,563 286 ,466 6 ,600 284 ,071 TIME DATE COMMENTS HR MIN 20 00 NOV 16, 1974 FILL PIPE 20 20 CM. NOV 16, 1974 GAL. PER MIN, 20 02 NOV 16, 1974 20 03 NOV 16, 1974 20 04 NOV 16, 1974 20 05 NOV 16, 1974 20 06 NOV 16, 1974 20 07 NOV 16, 1974 20 06 NOV 16, 1974 20 09 NOV 16, 1974 20 10 NOV 16, 1974 20 11 NOV 16, 1974 20 12 NOV 16, 1974 20 13 NOV 16, 1974 20 14 NOV 16, 1974 START DECLINE 20 15 NOV 16, 1974 20 16 NOV 16, 197^ 20 17 NOV 16, 1974 20 16 NOV 16, 1974 20 19 NOV 16, 1974 20 20 NOV 16, 1974 20 21 NOV 16, 1974 20 22 NOV 16, 1974 20 23 NOV 16, 1974 20 24 NOV 16, 1974 20 25 NOV 16, 1974 20 26 NOV 16, 1974 20 27 NOV 16, 1974 20 28 NOV 16, 1974 20 29 NOV 16, 1974 20 30 NOV 16, 1974 20 31 NOV 16, 19 7 4 20 32 NOV 16, 1974 20 33 NOV 16, 1974 20 34 NOV 16, 1974 20 35 NOV 16, 1974 20 36 NOV 16, 1974 20 37 NOV 16, 1974 20 38 NOV 16, 1974 20 39 NOV 16, 1974 PAGE II H-419 JOB NUMBER SPG«li210-C GAUGE/RUN NUMBER 196 RUN NO, 3 DST NQe 6 DATE OF JOl 1 1-1 6-7*' DATE OF RU> ii«*2i«7< SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA PRESSURE TIME (PSI) 6?617 261.818 6(633 279^613 6e650 277^716 6e667 275,820 6,663 276p436 6,700 272B476 6,717 271,006 6,733 269,655 6,750 268.398 6e767 267^212 6,763 266.J93 6,600 265,149 6e8J 7 264,272 6,833 263. 490 6,850 262^707 6,667 261^996 6,883 261.450 6,900 260e929 6,917 260.502 6,933 260.099 6,950 259,672 TIME DATE COMMENTS HR MIN 20 40 NOV 16,1974 20 41 NOV 16,1974 20 42 NOV 16,1974 20 43 NOV 16,1974 20 44 NOV 16,1974 20 45 NOV 16, 1974 20 46 NOV 16,1974 20 47 NOV 16,1974 20 48 NOV 16,1974 20 49 NOV 16,1974 20 50 NOV 16, 1974 20 51 NOV 16, 1974 20 52 NOV 16, 1974 20 53 NOV 16, 1974 20 54 NOV 16, 1974 20 55 NOV 16, 1974 20 56 NOV 16, 1974 20 57 NOV 16,1974 20 56 NOV 16, 197 4 20 59 NOV 16,1974 21 00 NOV 16,1974 END OF TEST 221 POINTS REPORTED THIS RUN PAGE 8 II B-420 JOB NUMBER spcuatQrcC DATE OF JQ[ i t « i 6 - 7 * % SPERRY^SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT PREPARED FOR ATLANTIC RICHFIELD COMPANY WELL NUMBER SG-17 FIELD/LEASE TRACT C«B SORGHUM GULCH COUNTY/PARISH RIO BLANCO STATE COLORADO TYPE OF TEST DRILL STEM REFERENCE ELEV GROUND LEVEL ADDITIONAL INFORMATION USED GAUGE NO, 204 WITH 1000 LB, ELEMENT GAUGE TEST DEPTH IS 914,24 FEET -k TEST INTERVAL IS 0 TO 967 ANNULUS 9 INITIAL HYDROSTATIC IS 205,91 FINAL HYDROSTATIC IS 207,26 GROUND LEVEL REFERENCE IS 7036 FEET 77 POINTS REPORTED THIS JOB PAGE 1 OF 3 PAGES 11 B-421 JOB NUMBER 8PC-H210-C GAUGE/RUN NUMBER 204 RUN N06 3 DST NO, 6 PATE OF JOf UM6«»7. DATE OF RUf lt-21-7' SPERRY^SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA TIME 000 067 201 469 473 477 364 381 414 461 548 615 662 816 950 033 050 084 150 217 264 418 422 427 560 577 594 627 878 895 929 996 029 046 063 129 196 213 230 247 PRESSURE (PSI) 212S660 212,294 211,746 211,311 211,380 211,614 212,226 212,409 212.706 213.209 213,506 213,757 214s009 214,237 214,329 214 214 214 214 213 213 213 213 443 420 352 032 689 460 186 094 213.392 213,460 213.506 213,620 213.689 213,780 214el23 215,609 216,775 217,301 217,301 217.163 216,340 215,792 216,466 220,707 222,924 TIME DATE COMMENTS HR MIN 13 17 NOV 16, 1974 13 21 NOV 16, 1974 13 29 NOV 16, 1974 13 45 NOV 16, 1974 14 45 NOV 16, 1974 15 46 NOV 16, 1974 16 39 NOV 16, 197 4 16 40 NOV 16, 1974 16 42 NOV 16, 1974 16 46 NOV 16, 1974 16 50 NOV 16, 1974 16 54 NOV 16, 1974 16 58 NOV 16, 1974 17 06 NOV 1.6, 1974 17 14 NOV 16, 1974 17 19 NOV 16, 19J4 17 20 NOV 16, 197 4 17 22 NOV 16, 1974 17 26 NOV 16, 1974 17 30 NOV 16, 1974 17 34 NGV 16, 1974 17 42 NOV 16, 1974 18 42 NOV 16, 1974 19 43 NOV 16, 1974 19 51 NOV 16, 1974 19 52 NOV 16, 1974 * 19 53 NOV 16, 1974 19 55 NOV 16, 1974 20 10 NOV 16, 1974 20 11 NOV 16, 1974 20 13 NOV 16, 1974 20 17 NOV 16, 1974 20 19 NOV 16, 1974 20 20 NOV 16, 1974 20 21 NOV 16, 1974 20 25 NOV 16, 1974 20 29 NOV 16, 1974 START 20 GAL. 20 30 NOV 16, 1974 MIN, INJECTION 20 31 NOV 16, 1974 20 32 NOV 16, 1974 PAGE I I H-422 • JOB SPG. NUMBER 1121G-C GAUGE/RUN NUMBER 304 RUN NO, 3 DST NO, 6 DATE OF JOE OATE OF RUf il«2I«*7< SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA PRESSURE TIME (PSI) 7,263 2248867 7,260 226.719 7,297 228. 410 7,314 230,239 7,330 232,022 7.347 233.874 7,364 235J520 7,380 237„051 7,397 238,377 7,414 239^589 7,431 240.777 7,447 240,777 7,464 239. 749 7,461 238.583 7,498 237.760 7,514 236,617 7,531 235.360 7,548 234.011 7,565 232,845 7,561 231,794 7,598 230.833 7,615 229e873 7,632 229e028 7,648 228,373 7,665 227,610 7,662 226,902 7,698 226,216 7,715 225.644 7,732 225,164 7,749 224,570 7,765 223.930 7,762 223,198 7,799 222,581 7,816 222.147 7,863 220.569 7,950 219,335 8,067 217,712 TIME OATE COMMENTS HR MIN 20 33 NOV 16, 1974 20 34 NOV 16# 1974 20 35 NOV 16, 1974 20 36 NOV 16, 1974 20 37 NOV 16, 1974 20 38 NOV 16, 1974 20 39 NOV 16, 1974 20 40 NOV 16, 1974 20 41 NOV 16, 1974 20 42 NOV 16, 1974 20 43 NOV 16, 197U 20 44 NOV 16, 1974 END 20 GAL. 20 45 NOV 16, 1974 MIN, INJECTION 20 46 NOV 16, 1974 20 47 NOV 16, 1974 20 48 NOV 16, 197 4 20 49 NOV 16, 1974 20 50 NOV 16, 1974 20 51 NOV 16, 1974 20 52 NOV 16, 1974 20 53 NOV 16, 1974 20 54 NOV 16, 1974 20 55 NOV 16, 1974 20 56 NOV 16, 1974 20 57 NOV 16, 1974 20 58 NOV 16, 1974 20 59 NOV 16, 1974 21 00 NOV 16, 1974 21 01 NOV 16, 1974 21 02 NOV 16, 1974 21 03 NOV 16, 1974 21 04 NOV 16, 1974 21 05 NOV 16, 1974 21 06 NOV 16, 1974 21 10 NOV 16, 1974 21 14 NOV 16, 1974 21 21 NOV 16, 1974 END OF TEST 77 POINTS REPORTED THIS RUN PAGF % II B-423 PRESSURE GAUGE BRILL STEM TEST SHEET Job No.r>>ft6*-//Z/<9-6 Date//Wl>7c/ Run fllZT ^ £s Office {..rl^Pt & Customer ft i.CC> - f"T Hu Location ^g)£6 Pit m UML-dH State C.C\\o£AOl> County/PwMrgh ,?,/P % I # M C-Q Well S 6) No. /7 Field T"fe ^ £T /^ ' h USE MILITARY TIME FOR ALL TIMES Time Date Arrive: Well/©e*k 1 . , Q / 3£? //- /6-7 I Range jOCO*^ Time Mode.-' /■■'//•/« -W Itm. Gauge # / 7£* Element fl JjQl 5 I Range I OOP"*" Time Mode / ,' : * ' /./ Type Too 1 Jo^//^TO ,'./ /A' £) . Te s t Depth ^^7 ~ fO/7 Zero Point 6j- :!.:•:.•. ,WO Lf^iU Packer Depth ^ & 7 Tail Pipe Depth I O \ 1 Top Gau Bottom Hole Temp. ^ / Atmos. Temp. ^5"^ a /V> £■/ /c? //.£-') On Bottom Packer Set TIME INFORMATION Time Date Initial Open .&/L- .!>..)! _JL_LLlLL/ Initial Shut-in ./.W-./^J ihlL^lj Start Flow t /Vw^u j* jv^jy i i ^y Li II B-425 F.R. -'06018 C OOZZ yocZ 09/ o •■ *L '. c ^ M § <*> N V\t ^ s S CN V V u rS f I .' u: .'■: II B-426 Page 1 SU£FAC> INFO WATSON • cription (Rate of Flow) Opened Tool Time 1447 Pressure (P.S.I.G.) Surfoce Choke CLOSED FOR INITIAL SHUT-IN 1448 - - F 1 N ISHED SHUT- 1 N 1518 - - RE-OPENED TOOL 1528 - - STARTED JETT 1 NG AIR 1822 - - STOPPED JETTING AIR 1922 - - STARTED INJECTING V/ATER 5 G A L / M 1 N 2037 - STOPPED INJECTING WATER 2051 - - STARTED INJECTING WATER 10 G AL/M 1 N 2100 _ _ STOPPED INJECTING WATER 2115 _ _ STARTED INJECTING WATER 20 GAL/M IN 2125 _. STOPPED INJECTING WATER 2140 _ _, STARTED P 1 PE F 1 LL-UP 2150 - _ STOPPED PIPE F 1 LL-UP 2205 _ _ STARTED FILLING ANNULUS 20 gal/m 1 N 2215 _ _ STOPPED FILLING ANNULUS 2230 _ _ CLOSED FOR FINAL SHUT-IN 2241 _. _ F IN ISHED SHUT- 1 N _. _, PULLED PACKER LOOSE ______ 2252 - - | Cushion Type Amount Pressun > Bol Sue "r torn Choke /A" MUD DA JA u,.A Typ. WATER FOAM Viscosity . T. Resist: of Mod ~ f3 ~ °F; of Wt. Water lo Filtrate C.C. °F Chloride Content ~ PPM I 4 JOHPJSTOftl ...found a totter way EQUIPMENT HOLE DATA Type Test Formation Tested Elevation M. F. E. OPEN HOLE PARACHUTE MEMBER GREEN 7036 Net Productive Intervol Estimated Porosity 50 POOR All Depths Measured From GROUND LEVEL Total Depth ^67 Moin Hole/Cosing Size Rat Hole/Liner Size Drill Collar Length Drill Pipe length Packer Depth(i) _____ 6 3/4' Ft. Ft. % Ft. 326' 638' I.D.. ID. 1012 & 1017 MULTI-FLOW 5VALUATOR FLUID SAMPLE DATA Sampler Pressure Recovery: Cu. Ft. Ga» cc. Oil cc. V/ater cc. Mud '" Tot. Liquid cc. Gravity . P.S.I.G. at Surface 'API @ Gas/Oil Ratio. cu. ft./bbl. RESISTIVITY CHLORIDE CONTENT Recovery Water (S? Recovery Mud @ Recovery Mud Filtrote @ Mud Pit Sample Mud Pit Sample Filtrate ppm ppm ppm RECOVERY DESCRIPTION FEET BARRELS % OIL % WATER % OTHERS API GRAVITY @ °F. RESISTIVITY @ °F. CHI. PPM @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. @ °F. Bemnrku Address 1500 SECURITY LIFE BUILDING , 1600 glenarm; Denver, Colorado 80202 ATLANT IC-R ICHF I ELD COMPANY Fi„H SORGHUM GULCH Well FEDERAL S-G #17 inrntion 436' fwl-181 'fsl-sec. 16-3s-96w Test Interval County 1017' TO 1067' RIO BLANCO <._t. Te.t # 7 11-18-74 II B-427 COLORADO Field Report No. Reports No. 06018 C Technician _ taylor( vernal) _.. Arp A »y MR. L. M. POWERS Requested 14(1 3X ) Page 2 JOHNSTON ...found a batter way PRESSURE DATA Instrument No. Capacity (P.S.I.G.) Instrument Depth Instrument Opening Pressure Grodient P. S.I. /Ft. Well Temperature F. Initial Hydrostatic Mud Initial Shut-in Initial Flow Final F low F inal Shut«in Final Hydrostatic Mud J-029 2800 1000' INSIDE 90 Field Report No. 06018 C TIME DATA Time Given Time Computed . Mins. . Mins. .Mins. . Mins. Mins. Mins. .Mins. .Mins. .Mins. .Mins. _Mins. .Mins. Remarks: *Shuf in pressure did not reach static reservoir pressure. Clock Travel inches per min. PRESSURE INCREMENTS POINTS — — Point Minutes Pressure T+At Point T + At At Minutes Pressure At Point Minutes Pressure T + At At 1 1 236.4 4 0 i 70.0 i ! 10 237.6 2 239.3 I 1 235.9 . 11 238.1 3 45.6 2 235.9 12 1 238.7 1 4 70.0 3 235.9 13 239.3 ! 5 239.3 4 235.9 14 239.3 6 241.5 5 236.4 15 239.3 7 100.6 6 237.0 16 239.8 8 243.2 7 237.6 17 239.8 9 253.4 8 237.6 18 239.8 10 210.4 9 238.1 19 239.8 11 209.8 10 238.1 20 239.8 12 188.9 11 238.1 30 240.4 13 242.1 12 238.1 40 241.0 14 251.7 13 238.1 50 241.0 15 247.2 14 238.1 60 241.0 16 265.9 15 238.1 70 241.0 17 248.3 20 238.7 80 241 .0 18 327.0 25 238.7 90 241.0 19 255.7 30 239.3 100 241.5 20 424.4 5 31 239.3 110 242.1 21 247.8 120 242.1 22 247.8 7 0 100.6 130 242.1 1 152.1 140 242.1 2 175.9 150 243.2 3 193.4 160 243.2 1 4 207.0 170 243.2 5 217.2 8 173 243.2 6 225.1 II B-428 1 9 175 253. 4 7 230.8 110 178 210.4 8 234.2 10 209.8 9 235.9 20 209.8 COf T I N U E D I C0NT \ NUED Page 3 ...found a botisr wsy PRESSURE DATA I. Instrument No. Capocity (P.S.I.G.) Instrument Depth __ Instrument Opening Pressure Gradient P. S.I. /Ft. Well Temperature J-029 Field Report- No. 06018 C Initial Hydrostatic Mud Initial Shut-in Initial Flow Final F low Final Shut-in Finol Hydrostatic Mud Remarks: TIME DATA i Time Computed . M i n s . . Mins. . Mins. .Mins. .Mins. Mins. Mins. .Mins. .Mins. . Mins. .Mins. _ Mins. *Snuf in pressure did not reach static reservoir pressure. Clock Travel inches per min. PRESSURE INCREMENTS Point Minutes Pressure T + A-t At I Point Minutes Pressure Point Minutes Pressure T + A At 30 40 50 11 58 209.8 20 209.8 209.8 22 24 247.8 247.2 >247 . 2 209.8 15 12 60 1 U 8.9 212.1 222.3 228.5 231.9 234.2 235.9 235.9 237.0 10 20_ 30 40 50 60 70 13 73 237 . 6 25 i 247.2 26 254.6 281 259.1 80| 407.4 82 84 86 88 416.5 419.9 20 89 30 261.4 32 1 262:5 34 36 263.6 264.8 16 40 237.6 240.4 241.5 241.5 241.5 242. 1 242. 1 242. 1 247.2 8 10 12 14 14 J6 17 1 250.0 38 42 44 265.9 265.9 252.9 250.0 17 49 _46 48 50 52 54 251.2 251.7 251.7 251.7 251.7 251.7 251. I 248.9 62 F8 64 56 58 60 66 248.9 248.3 248.3 266.5 281.2 291.4 299.3 306.1 313.4 324.8" 327.0 70 72 19 74 76 78 _292^_5_ 275.5 263.6 II B-429 _90 _92 94 422.7 424.4 424.4 388.2 96 98 100 J02 104 106 108 110 256.8 255.7 329.9 366. 1 112 114 116 118 353.1 327.0 303.8 288.0 273.8 264.2 257.4 254.0 251.2 250.0 249.5 248.9 248.3 J_20 122 248.3 248.3 21 123 124 126 128 130 132 134 135 247.8 247 . 8 247.8 .247 • ■ 247 ."8 247. £ 247.8 __24 I . I 247.^ ffll TLB ...found a better m GUIDE TO IDENTIFICATION OF DRILL STEM TEST PRESSURE CHARTS A. Initial Hyd. Mud B. Initial Shut-in C. Initial Flow D. Final Flow E. Final Shut-in F. Final Hyd. Mud The following points are either fluctuating pressures or points indicating other packer settings, (testing different zones). A-l, A-2, A-3, etc. Initial Hyd. Pressures B-l, B-2, B-3, etc. Subsequent Shut-in Pressures C-l, C-2, C-3, etc. Flowing Pressures D-l, D-2, D-3, etc. Subsequent Final Flow Pressures E-l, E-2, E-3, etc. Subsequent Final Shut-in Pressures F-l, F-2, F-3, etc. Final Hyd. Mud Pressures Z — Special pressure points such as pumping pressure recorded for formation breakdown. RECORDER NO. J- 029 REPORTS REQUESTED 14+ -:-^iv N -/ • 3 5 I I Page: 4 ...found a better way r PRESSURE DATA < Instrument No. J-405 Field Report»No. f Capacity (P.S.I.G.) 2800 06018 C Instrument Depth 1028' TIME C Time Given Mins. i Instrument Opening OUTS 1 DE — _ — . , Pressure Gradient P. S.I. /Ft. )ATA Time Computed Mins. Well Temperature F. 90 Initial Hydrostatic Mud A Initial Shut-in B Initio 1 F low C Mins. Mins. Mins. Mins. Mins. Mins. Mins. Mins. Final F low D Mins. Final Shut'in E Mins . Final Hydrostatic Mud F Remarks: ; 1 * Shut in pressure did no* reach static reservoir pressure. Clock Travel inches per min. PRESSURE INCREMENTS p o | f ' J c' ■ Point Minutes Pressure T ^ -At : Point \t | Minutes Pressure T + At At Point Minutes : Pressure T + At At W i 250.8 4 0 92.6 10! 246.8 ! , 2 251.9 1 251.3 | 11 247.4 ! 3 75.1 2 >251.3 | 12 247.9 1 4 92.6 3 251.3 13 248.5 1 5 251.3 4 251.3 I 14 248.5 1 6 251 .3 5 251.3 I 15 248.5 7 120.3 6 251.3 . I 16 248.5 I 8 258.7 7 251.3 I 17 248.5 9 268.3 8 I 25 1 . 3 18- 249.1 | 10 228.7 9 251.3 19 249.1 I 11 225.3 10 251.3 20 249.1 | 12 205.0 11 251.3 30 250.2 1 13 252.5 12 251.3 40 251.3! 14 263.2 «. 13 251.3 50 251.9 | 15 260.4 14 251.3 60 252.5 ! 16 277.3 15 251.3 70 253.0 17 262.1 20 251.3 80 253.6 I 18 339.5 ?b 251.3 90 254.2 | 19 269.4 30 251.3 100 254.2 20 436.1 i 5 31 251.3 110 254.2 21 264.3 120 254.2 22 264.3 7 0 120.3 130 254.7 — 1 162.1 140 255.3 2 186.4 150 256.4 : 3 203.3 If.O 258.1 I 4 216.3 170 - 5_ 227.0 8 _ 1 1 : - . 6 234.4 II B-43] 9 175 . 2' - 7 23ct.'< 10 178 228. i 8 242.9 10 22 ; . 9 245.7 .1 QQTiy I MUED co-: MNUED Page 5 ...found a battst way PRESSURE DATA PRESSURE INCREMENTS p o I r-j T : Point Minutes T + A t Point Minutes Pressure T \ \t \t Point Minutes Pressure At " 30 227.0 20 260.9 60 j 401.6 i 424. 2_X - 40 225.9 22 1 260.4- 82 I r)0 225.3 24 260.4 84 429.3 1 11 58 i 225.3 I 15 25 260.4 86 433.8 — 12 60 1 205.0 26 263.8 88' 436.1 ! 1 227.0 28 268.8 ■-4 20 89 436.1 | 2 236. 1 30, 271.7 qo 414.6 i 3 241.7 32 273.4 92 378.4 ! — r 4 245.1 34 4.5 | 94 348.5 I 5 247.4 36 275.9 96 3! '4. 2 6 248.5 38 276.8 98 305.6 7 248.5 16 40 277.3 1 00 292.6 8 248.5 42 267.7 102 281.3 9 248.5 44 263.8 104 274.5 10 249. 1 4^ 262.6 106 270.0 20 249.6 48 262.1 108 267.1 30 21)0.2 17 49 262.1 110 266.6 4 0 250.8 50 271.7 112 265.5 50 290. 8 52 288.6 114 265.5 60 251.3 94 300.5 116 265.5 70 252.5 . — — 56 308.4 118 264.3 13 73 2.5 58 315.2 1 20 264.3 .. . 2 258.1 60 322.5 122 264.3 4 260.4 62 332.1 21 123 264.3 _ i 6 261.5 18 64 339.5 1 24 264.3 j i 8 262.1 66 314.0 126 294 . 3 - - 10 i .6 68 2 14.3 128 294 . 12 14 2l 2. 70 281.3 II B-432 130 4.3 .. 72 27; . ! 1 V 2l ■'. I 14 17 .. 19 74 I l. 4 1 34 21 4.3 264. ! i 3.2 331.0 ; ; i $! 18 i 2) 1.5 78 366.6 — ■fr n ; ...found a better way GUIDE TO IDENTIFICATION" OF DRILL STEM TEST PRESSURE CHARTS r~ 1 JOKL'STOPJ FIELD REPORTS REPORT NO. RECORDER NO. CAPACITY REQUESTED / C-l ^ A. Initial Hyd. Mud B. Initial Shut-in C. Initial Flow D. Final Flow E. Final Shut-in F. Final Hyd. Mud The following points are either fluctuating pressures or points indicating other packer settings, (testing dilietent zones). A-l, A-2, A-3, etc. Initial Hyd. Pressures B-l, B-2, B-3, etc. Subsequent Shut-in Pressures C-l, C-2, C-3, etc. Flowing Pressures D-l, D-2, D-3. etc. Subsequent Final Flow Pressures E-l, E-2, E-3, etc. Subsequent Final Shut-in Pressures F-l. F-2, F-3, etc. Final Hyd. Mud Pressures Z — Special pressure points such as pumping pressure recorded for formation breakdown. FIELD REPORT NO. 06018 C CAPACITY 2800# RECORDER NO. J-405 REPORTS REQUESTED : 14+ I i t ■ ! | .': ■ ■ - II R-433 - ..i.i .. -. . _... . i. - .. ..wf. .—._. .**.. . —* ■ -i *- -• -► - - . ...~ — .«1U*..«»- ~». . ..... ♦ % IS POST OFFICE BOX 36363 H OUSTON, TEX AS 77036 (713) 494-3021 December 2, 1974 J. A. Fouche President Mr. F. C. Witmer Atlantic Richfield Company 1500 Security Life Building Denver, Colorado 80202 Dear Sir: Enclosed is the. original of our Precision Pressure Gauge Drill Stem Test Job SPG-11210-D performed on your Federal SG-17 Well, Tract C-b , Piceane Creek Basin, Sorghum Gulch, Rio Blanco County, Colorado on November 19, 1974. Test interval was 1,017 feet (Packer Set) to 1,067 (T.D.) with one gauge inside the annulus above the packer and one gauge inside the drill pipe below the packer. Also enclosed is the chart for gauge number 196 and 204 with Field Data Sheet. Distribution is being made according to the attached mailing list. Thank you for this opportunity to be of service. Very truly yours, SPERRY-SUN Carl Kisingerj/Jr// Manager, Pressure Services RECEIVED JdH~ l0^l DEC 0 5 1974 A* I ROGERS II H-434 % JOB NUMBER SPG*U210"D DATE OF JC 11-19-:*/ SPERRY-SUN P-RECISXON SUBSURFACE PRESSURE GAUGE REPORT PREPARED FOR ATLANTIC RICHFIELD COMPANY I WELL NUMBER FEDERAL SG-17 FIELD/LEASE TRACT C~B SORGHUM GULCH COUNTY/PARISH RIO BLANCO STATE COLORADO TYPE OF TEST DRILL STEM REFERENCE ELEV GROUND LEVEL ADDITIONAL INFORMATION^ USED GAUGE NO, J96 WITH 1000 LB, ELEMENT GAUGE DEPTH IS 1043,05 FEET INSIDE DP GROUND LEVEL REFERENCE IS 7036 FEET INITIAL HYDROSTATIC IS 265,783 FINAL HYDROSTATIC IS 270,263 TEST INTERVAL IS FROM 1017 FEET (PACKER SET) TO 1067 FEET (TD) INSIDE DP II B-435 391 POINTS REPORTED THIS JOB PAGE 1 OF '. I PAGES SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA PRESSURE TIME CPSX) OB000 84,493 ,e*7 267e378 .033 265t647 .050 268,327 ,067 269,512 .063 269,868 .100 270^058 ,117 270,081 .133 270.176 ,150 270.176 ,167 270,176 .163 270.200 ,200 270ii53 .317 270*271 .233 270,271 ,250 270,271 ,267 269,631 ,263 270.200 .300 270,271 .317 270, 342 • 333 270. 413 ,350 270.390 ,367 270,390 ,363 270.318 ,400 270,366 ,417 270,295 ,433 270,437 ,450 270,461 .467 270,413 ,483 270,484 ,500 270,437 ,517 270,461 ,533 270,461 TIME DATE COMMENTS HR MIN 14 46 NOV 19,1974 CLOSE TOOL 14 47 NOV 19,1974 START INITIAL 14 48 NOV 19,1974 SHUT IN 14 49 NOV 19,1974 14 50 NOV 19,1974 14 51 NOV 19,1974 14 52 NOV 19,1974 14 53 NOV 19,1974 14 54 NOV 19,1974 14 55 NOV 19,1974 14 56 NOV 19,1974 14 57 NOV 19,1974 14 58 NOV 19,1974 14 59 NOV 19,1974 15 00 NOV 19,1974 15 01 NOV 19,1974 15 02 NOV 19,1974 15 03 NOV 19,1974 15 04 NOV 19,1974 15 05 NOV 19,1974 15 06 NGV 19, 1974 15 07 NOV 19, 1974 15 08 NOV 19, 1974 .15 09 NOV 19, 1974 15 10 NOV 19, 1974 15 11 NOV 19,1974 15 12 NOV 19,1974 15 13 NOV 19,1974 15 14 NOV 19,1974 15 15 NOV 19, 1974 15 16 NOV 19,1974 15 17 NOV 19,1974 15 18 NOV 19,1974 END SHUT-IN 33 POINTS REPORTED THIS RUN PAGE 2 II B-436 JOB NUMBER SPG-U210-D DATE OF JC 11M9-0 SPERRY^SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT PREPARED FOR ATLANTIC RICHFIELD COMPANY WELL NUMBER FEDERAL SG-17 FIELD/LEASE TRACT C-B SORGHUM GULCH COUNTY/PARISH RIO BLANCO STATE J COLORADO TYPE OF TEST DRILL STEM REFERENCE ELEV GROUND LEVEL ADDITIONAL INFORMATION USED GAUGE NO, J96;WITH 1000 LB, ELEMENT I GAUGE DEPTH IS 1043,05 FEET INSIDE DP GROUND LEVEL REFERENCE IS 7036 F-EET INITIAL HYDROSTATIC IS 265,783 FINAL HYDROSTATIC IS 270,263 TEST INTERVAL IS FROM 1017 FEET (PACKER SET) TO 1067 FEET (TD) INSIDE DP i TI B-437 391 POINTS REPORTED THIS JOB PAGE 1 OF 11 PAGES JOB 8PG- NUMBER •U210-0 GAUGE/RUN NUMBER %9b RUN NO, 4 DST NO, 7 DATE OF JC DATE OP Rl. n«27«7; SPERRY«SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA TIME c.ooo ,017 ,033 ,050 ,067 ,063 ,100 ,117 el33 ,150 ,167 ,163 ,200 t217 ,233 ,250 ,267 ,263 ,300 .317 ,333 ,350 ,367 ,363 ,400 ,ai7 ,433 ,450 ,467 ,463 ,500 ,517 ,533 ,550 ,567 ,563 ,600 ,617 ,633 ,650 'RESSURE CPSIi 176,137 200.346 206.227 232.072 237,075 247,603 255.357 260. 549 264,130 266,335 267,236 268.042 268 268 268 269 269 269 540 872 920 157 157 275 269.299 269,465 269,536 269,607 269,465 269.607 269.939 269,797 269.797 269.844 269.987 269.987 269,773 269,773 270,105 270,129 269,797 269,844 269,821 270,153 270,129 270,247 TIME DATE COMMENTS HR HJN 15 26 NOV 19, 1974 FLOW TEST 15 29 NOV 19, 1974 IN DP 15 30 NOV 19, 1974 15 31 NOV 19, 1974 15 32 NOV 19, 1974 15 33 NOV 19, 1974 15 34 NOV 19, 1974 15 35 NOV 19, 1974 15 36 NOV 19, 1974 15 37 NOV 19, 1974 15 38 NOV 19, 1974 15 39 NOV 19, 1974 15 40 NOV 19, 1974 15 41 NOV 19, 1974 15 42 NOV 19, 1974 15 43 NOV 19, 1974 15 44 NOV 19, 1974 15 45 NOV 19, 1974 15 46 NOV 19, 1974 15 47 NOV 19, 1974 15 48 NOV 19, 1974 15 49 NOV 19, 1974 15 50 NOV 19, 1974 15 51 NOV 19, 1974 15 52 NOV 19, 1974 15 53 NOV 19, 1974 15 54 NOV 19, 1974 15 55 NOV 19, 1974 15 56 NOV 19, 1974 15 57 NOV 19, 1974 > 15 58 NOV 19, 1974 15 59 NOV 19, 1974 16 00 NOV 19, 1974 16 01 NOV 19, 1974 16 02 NOV 19, 1974 16 03 NOV 19, 1974 16 04 NOV 19, 1974 16 05 NOV 19, 1974 16 06 NOV 19, 1974 16 07 NOV 19, 1974 PAGE 2 II B-438 JOB NUMBER 3PG»U2iO-0 GAUGE/RUN NUMBER 16S3 270, >840 I 1 ,700 270, ,962 * ,717 270, ,816 ,733 270, .840 ,750 271, ,030 ,767 270, ,982 ,763 270, ,888 ,800 270, ,840 ,617 271, ,030 ,633 270, ,864 B650 270, t840 ,867 270 ,640 ,683 270 ^745 ,900 271 ,030 ,917 270 ,982 ,933 270 ,868 ,950 270 .888 ,967 270 ,888 ,963 270 ,616 2 ,000 271 ,030 2 ,017 271, ,054 2 ,033 270 ,68e 2 ,050 270 .935 2 ,067 270, ,982 2 ,063 270, ,935 2 ,100 271, ,006 2 ,U7 271, ,172 2 ,133 271, ,030 2 ,150 271, ,101 2 ,167 271, ,077 2 ,183 271, ,030 2 ,200 270, .982 2 .217 270, ,982 2 ,233 271, .030 2 ,250 271 ,030 2 ,267 271 .125 2 ,283 271 B 172 2 ,300 271 -101 2 ■ 317 271 ,077 TIME DATE COHMENTS HR MIN 17 08 NOV 1 .9, 1974 17 09 NOV ! i9, 1974 17 10 NOV ! l9, 1974 17 11 NOV 1 l9, 19 7 4 17 12 NOV ] ,9, 1974 17 13 NOV j l9, 1974 17 14 NOV 1 i9, 1974 17 15 NOV 1 19, 1974 17 16 NOV ] 19, 1974 17 17 NOV 1 19, 1974 17 18 NOV J L9, 1974 17 19 NOV ] 19, 1974 17 20 NOV ] 19, 1974 17 21 NOV 1 l9, 1974 17 22 NOV ! 19, 1974 17 23 NOV ! 19, 1974 17 24 NOV I 19, 1974 17 25 NOV ! L9, 1974 17 26 NOV ! L9, 1974 17 27 NOV ] 19, 1974 17 28 NOV ! 19, 1974 17 29 NOV 1 19, 1974 17 30 NOV ! 19, 1974 17 31 NOV ] 19, 1974 17 32 NOV 1 19, 1974 17 33 NOV 1 19, 1974 17 34 NOV 1 19, 1974 17 35 NOV 1 19, 1974 17 36 NOV 1 l9, 1974 17 37 NOV j 19, 1974 * 17 38 NOV J 19, 1974 17 39 NOV 1 19, 1974 17 40 NOV J 19, 1974 17 41 NOV 1 19, 1974 17 42 NOV 1 19, 1974 17 43 NOV I 19, 1974 17 44 NOV ] 19, 1974 17 45 NOV ] 19, 1974 17 46 NOV 1 19, 1974 17 47 NOV 1 19, 197 4 PAGE 4 II B-440 JOB NUMBER 8PG«U210-D GAUGE/RUN NUMBER 196 RUN NO, 4 DST NO, 7 DATE OF JC 11-19-', DATE OF Rl 11-27-'. SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA PRESSURE TXHE (PSI) 2,333 271 ,196 2,350 271 ,030 2,367 271 • 077 2:e383 271 ,054 2,400 271 .148 2,417 271 ,172 2,433 271 el72 2,450 271 e125 2!»467 271 ,125 2"i,483 271 ,196 2,500 271 ,291 2,517 271 ,362 20533 271 .267 2,550 271 e 765 i!,567 271 .362 21,583 271 .717 2,600 271 [314 2.617 271 i955 2,633 271 .291 2,650 271 ,978 2,667 271 .314 2,663 271 e907 2,700 271 .551 2,717 271 .480 2,733 271 ,955 2,750 271 ,64b 2,767 271 ,741 2,783 271 ,433 2,800 271 9717 2,617 272 ,879 2,833 271 ,623 2,850 271 ,646 2,867 271 e931 2,883 271 • 551 2,900 271 ,433 2,917 271 9551 2,933 271 ,660 2,950 281 • 747 2,967 255 • 878 2,963 238 ,759 TIME DATE COMMENTS HR MIN 17 48 NOV 3 L9, 1974 17 49 NOV 3 L9, 1974 17 50 NOV 1 19, 197 4 17 51 NOV 3 19, 197 4 17 52 NOV j 19, 1974 17 53 NOV 1 19, 1974 17 54 NOV 3 19, 1974 17 55 NOV 3 19, 1974 17 56 NOV 3 19, 1974 17 57 NOV 3 19, 1974 17 56 NOV 3 L9, 1974 17 59 NOV 3 19, 1974 18 00 NOV 3 19, 1974 18 01 NOV 1 19, 1974 18 02 NOV 3 L9, 1974 18 03 NOV 1 19, 1974 18 04 NOV I .9, 1974 18 05 NOV 3 L9, 1974 18 06 NOV ! L9, 1974 18 07 NOV ! L9, 1974 18 08 NOV 3 19, 1974 18 09 NOV 1 19, 1974 - • 18 10 NOV ! 19, 1974 18 11 NOV 3 L9, 1974 18 12 NOV 3 L9, 1974 18 13 NOV 3 L9, 1974 18 14 NOV 3 19, 1974 18 15 NOV ] L9, 1974 18 16 NOV 1 19, 1974 18 17 NOV 3 L9, 1974 18 18 NOV 1 19, 1974 18 19 NOV 3 19, 1974 18 20 NOV 3 L9, 1974 18 21 NOV 3 19, 1974 18 22 NOV 3 L9, 1974 18 23 NOV 1 19, 1974 18 24 NOV 3 19, 1974 START AIR JET 18 25 NOV 3 19, 1974 INSIDE DP 18 26 NOV 3 19, 1974 18 27 NOV 1 19, 1974 PAGE 5 II B-441 JOB NUMBER GAUGE/RUN NUMBER 196 RUN NO DST NO, 7 SPERRY^SUN PRECISION SUBSURFACE PRESSURE GAUGE REPCRT DATE OF JC il-19-7 DATE OF Rl 11-27-", DELTA PRESSURE TIME CPSU £,000 242,055 1.017 242,647 S,033 242,434 $,050 242,197 3,067 241,983 3,083 242,149 3., 100 241,983 SaU7 241,699 2S„133 241,438 £.,167 241,391 ri , 20 0 241,396 S3U233 241,201 5*267 241,082 SS.,300 241,011 m,333 240,916 Si,367 240.845 Xlf400 240-.750 !M33 2401584 S^t.7 240,584 3;,50 0 240.606 3*533 240.584 50567 240,632 3iR60 0 240,656 1*633 240,276 Sr667 240,561 3,700 240,253 3,733 240,442 3,767 240.537 3,800 240,442 3,833 240,418 3,867 240.300 3,900 240. 324 3,917 220.667 3,933 244,378 3,950 247,010 3,967 255,475 3,983 260.763 a, ooo 264,011 a, on 265.790 4,033 266,857 TINE OATE COMMENTS HR MIN 18 28 NOV 19, , 1974 18 29 NOV 19 . 1974 18 30 NOV 19 f 1974 18 31 NOV 19 f 1974 18 32 NOV 19 r 1974 18 33 NOV 19 t 1974 18 34 NOV 19 , 1974 18 35 NOV 19 t 1974 18 36 NOV 19 , 1974 18 38 NOV 19 t 1974 18 40 NOV 19 r 1974 18 42 NOV 19, p 1974 18 44 NOV 19, , 1974 18 46 NOV 19, . 1974 18 4 8 NOV 19 p 1974 - 18 50 NOV 19, > 1974 18 52 NOV 19, r 1974 18 54 NOV 19, . 1974 18 56 NOV 19, - 1974 * 18 53 NOV 19, . 1974 19 00 NOV 19, P 1974 19 02 NOV 19, • 1974 19 04 NOV 19, r 1974 19 06 NOV 19, r 1974 19 08 NOV 19, - 1974 19 10 NOV 19, - 1974 19 12 NOV 19, r 1974 19 14 NOV 19, r 1974 19 16 NOV 19, r 1974 19 18 NOV 19, i 1974 19 20 NOV 19, » 1974 19 22 NOV 19, p 1974 END AIR JET 19 23 NOV 19, p 1974 INSIDE DP 19 24 NOV 19, - 1974 19 25 NOV 19, - 1974 19 26 NOV 19, - 1974 19 27 NOV 19, r 1974 19 28 NOV 19, - 1974 19 29 NOV 19, - 1974 19 30 NOV 19, 1974 PAGE 6 II B-442 JOB NUMBER SPC»U210-0 GAUGE/RUN NUMBER 196 RUN NOe 4 OST NOe 7 D6TE OF JC il-19-7 DATE OF Rl 11-27-/ 8PERRY-»SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA PRESSURE TIME CPSI) a, ,050 267, ,331 «. ,067 267, ,070 4, ,083 268, ,090 «i ,100 268, ,327 .!!, .117 268, ,730 *l .133 269, ,109 .'1. ,150 269, ,228 3j ,1^7 269, ,038 •l ,163 268, ,730 • 1 < ,200 269, ,346 », ,217 269, ,417 «l ,233 269i ,370 <*| ,250 269, ,157 $ ,267 269, ,655 < ,533 439,657 6. ,550 444,077 6, ,567 446,441 6, ,583 448,924 6( ,600 451.075 6, ,617 452,942 6, ,633 454,243 6, ,650 455.046 b, ,667 435,614 6, ,683 417,068 6i ,700 399,901 TIME DATE COMMENTS HR MXN ai 31 NOV 19 ,1974 21 32 NOV 19 ,1974 21 33 NOV 19 f 1974 21 34 NGV 19 r 1974 21 35 NOV 19 p 1974 21 36 NOV 19 f 1974 21 37 NOV 19 p 1974 21 38 NOV 19 ? 1974 21 39 NOV 19 , 1974 21 40 NOV 19 , 1974 21 41 NOV 19 , 1974 21 42 NOV 19 ,1974 END 20 G/M 21 43 NOV ■19, ,1974 DCWN DP 21 44 NOV 19, - 1974 21 45 NOV 19, ,1-974 21 46 NOV 19, , 1974 21 47 NOV 19, . 1974 21 4 8 NOV 19, - 1974 21 49 NOV 19, , 1974 21 50 NOV 19, , 1974 21 51 NOV 19, , 1974 21 52 NOV 19, , 1974 21 53 NOV 19, ,1974 FILL DP 21 54 NOV 19, , 1974 21 55 NOV 19, p 1974 21 56 NOV 19, ,1974 21 57 NOV 19, , 1974 21 56 NOV 19, - 1974 21 59 NOV 19, p 1 9 7 4 22 00 NOV 19, , 1974 22 01 NOV 19, t 1974 22 02 NOV 19, p 1974 22 03 NOV 19, p 1974 22 04 NOV 19, . 1974 ZZ 05 NOV 19, p1974 22 06 NOV 19, 1974 22 07 NOV 19, .1974 DP FILLED ZZ 08 NOV 19, p 1974 22 09 NOV 19, 1974 22 10 NOV 19, 1974 PAGE 10 II B-446 ♦ • J03 NUMBER SPG«U2iO-D GAUGE/RUN NUMBER iAUGE DEPTH IS 977 « 66; FEET OUTSIDE I DP - IN ANNULUS > GROUND LEVEL REFERENCE IS 7036 FEET TEST INTERVAL IS FROM ZERO FEET (SURFACE) TO 1017 FEET (PACKER DEPTH) INSIDE ANNULUS * II B-448 244 POINTS REPORTED THIS JOB PAGE 1 OF 8 PAGES JOB NUMBER SPG«H210~P * GAUGE/RUN NUMBER 204 RUN NO, a DST NO, 7 SPERRY-SUN PRECISION SUBSURFACE PRESSURE DATE Or JO il-19-7 . DATE OF RU: U-27-7/. GAUGE REPORT DELTA PRES! 3URE TIME cpsi) 0,000 229 ,942 ,20 0 232. ^11 ,217 232. ,617 ,233 232, ,731 ,2'jO 232. ,799 ,267 232; ^868 ,263 232. ,959 ,300 233. ■ 028 ,333 233. ,074 ,367 233. ,142 B400 233, ,188 ,467 233 ,234 ,533 233 .257 ,600 233 ,302 ,667 233 .325 ,663 233 .348 ,700 233 .34J8 • 717 233 .348 ,733 233, ,348 ,900 233, i668 .917 233, ,645 ,933 233. ,645 ,950 233, ^600 ,967 233. ,600 1 ,000 233, 577 1,033 233, ,600 1,100 233, 622 1,167 233, ,668 1,233 233. ,737 1,300 233. )714 1,367 233, ,760' 1,433 233, 760 1,500 233. 828 1,567 233, 828 1,700 233, ,920 1,833 233, ,965 1 ,967 234, ,011 2,100 234, ,102 2,163 234, ,102 2.200 234, ,125 TIME HR MIN DATE COMMENTS 14 14 14 14 14 14 14 14 14 14 14 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 16 16 16 16 16 16 16 16 16 34 46 47 48 49 50 51 52 54 56 58 02 06 10 14 15 16 17 18 28 29 30 31 32 34 36 40 44 48 52 56 00 04 08 16 24 32 40 45 46 NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 197 4 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 INITIAL initial HYDRO, SHUTIN END SHUT-IN START FLOW INSIDE DP PAGE 2 1 I B-449 JOB NUMBER SPG-11210-D GAUGE/RUN NUMBER 204 RUN NO, 4 DST NO, 7 DATE OF JO. U-19-74 DATE OF RUN 11-27-74 SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA PRESSURE TIME (psn 2 .217 234 8148 2 ,233 234 ,148 2 .250 234 .148 2 ,267 234, ,148 2 ,283 234, .171 2, ,300 234, .171 2, ,317 234, .171 2, ,333 234, ,171 2, ,350 234, ,171 2, ,367 234, , 1 7 i 2, ,500 234, ,240 2, ,633 234, ,262 2, ,767 234, ,354 2, ,900 234, ,354 3, ,033 234, ,445 3 ,167 234 ,514 3 ,300 234 1537 3 ,433 234 ,560 3 ,567 234 .628 3 ,700 234 [697 3, ,733 234, .697 3 ,767 234 ; 697 3 ,763 234, [697 3 ,800 234 ,697 3 ,817 234 .697 3 ,833 234, ,697 3, ,850 234, ,697 3, ,867 234, ,743 3, ,863 234, ,788 3. ,900 234, ,834 3, ,917 234, ieeo 3, ,933 234, ,994 3, ,950 235, i 063 3, ,967 235, ,085 3, ,983 235, ,085 4, ,000 235, ,131 4, ,017 235, ,177 4, ,033 235, ,223 4, ,050 235, ,223 4 ,067 235, ,291 TIME HR MIN DATE 16 16 16 16 16 16 16 16 16 16 17 17 17 17 17 17 17 18 18 18 18 18 16 18 16 18 18 18 18 18 18 18 18 18 16 18 18 18 18 18 47 NOV 48 NOV 49 NOV 50 NOV 51 NOV 52 NOV 53 NOV 54 NOV 55 NOV 56 NOV 04 NOV 12 NOV 20 NOV 28 NOV 36 NOV 44 NOV 52 NOV 00 NOV 08 NOV 16 NOV 18 NOV 20 NOV 21 NOV 22 NOV 23 NOV 24 NOV 25 NOV 26 NOV 27 NOV 28 NOV 29 NOV 30 NOV 31 NOV 32 NOV 33 NOV 34 NOV 35 NOV 36 NOV 37 NOV 38 NOV 19 19 19 19 19 19 19 19 19 19 19 19 19", 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 19/4 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 1974 COMMENTS END RECOVERY INSIDE DP THIS GAUGE IN ANNULUS START AIR DOWN DP JET PAGE 3 II B-450 * JOB NUMBER SPG-11210«D GAUGE/RUN NUMBER 204 RUN NQe 4 OST NO, 7 DATE Of- JOB DATE OF RUN 11-27-74 SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA PRESSURE TIME (PSI) 4, ,063 235. ,314 4, ,117 235( ,291 4 ,150 235, ,291 4 .217 235, ,291 4 ,283 235, ,291 4 ,417 235, .314 4, B550 235, ,337 4, t683 235, ,360 4, ,700 235, ,360 4, ,717 235, ,405 4, ,733 235, ,405 4, ,750 235, ,451 4| ,767 235. ,451 «, 783 235, ,451 a, 800 235, ,451 a, 817 235, ,474 4t 6 33 235, ,474 ^. ,850 235, ,474 4, ,867 235. ,474 ^, 883 235, ,474 4, ,900 235, ,451 4, ,917 235, ,426 4, ,933 235, ,47 4 A, ,967 235, ,360 5 ,000 235, ,337 5 ,033 235, ,337 5 ,100 235, ,291 5 ,167 235, ,268 5 ,233 235 ,291 5 ,300 235, ,245 5 ,433 235, ,291 5 ,567 235, ,314 5 s717 235, ,360 5 ,850 235 ,360 5 ,983 235, ,383 6 ,000 235, ,428 6 ,017 235, ,428 6 ,033 235, ,428 6 ,050 235, ,428 6, ,067 235, ,451 TIME DATE COMMENTS HR MIN 18 39 NOV 19, 1974 18 41 NOV 19, 1974 18 43 NOV 19, 1974 18 47 NOV 19, 1974 18 51 NOV 19,1974 18 59 NOV 19, 1974 19 07 NOV 19, 1974 19 15 NOV 19,1974 19 16 NOV 19,1974 19 17 NOV 19,1974 19 10 NOV 19, 1974 19 19 NOV 19.»1974 19 20 NOV 19, 1974 19 21 NOV 19, 1974 19 22 NOV 19r1974 END AIR JET 19 23 NOV 19,1974 DOWN ANNULUS 19 24 NOV i (-, i n *t /I 1 9 , 1 V / M 19 25 NOV 19, 1974 19 26 NOV 19, 1974 19 27 NOV 19, 1974 19 28 NOV 19, 1974 19 29 NOV 19, 1974 19 30 NOV 19,1974 19 32 NOV 19,1974 19 34 NOV 19,1974 19 36 NOV 19, 1974 19 40 NOV 19, 1974 19 4 4 NOV 19,1974 19 40 NOV 19,1974 19 52 NOV 19,1974 20 00 NOV 19,1974 20 00 NOV 19,1974 20 17 NOV 19, 1974 20 25 NOV 19,1974 20 33 NOV 19,1974 20 34 NOV 19,1974 20 35 NOV 19,1974 20 36 NOV 19,1974 20 37 NOV 19,1974 20 38 NOV 19,1974 START 5 G/M PAGE 4 II B-451 JOB NUMBER SPG-11210-D GAUGE/RUN NUMBER 204 RUN N09 n DST NOR DATE OF JO!1 11-19-7'! DATE OF RUM 11-27-7'i SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA PRESSURE TIME (PSI) 6,063 235.451 6,100 235*451 6,117 235.474 6,133 235.474 6,150 235,497 6,167 235,451 6,163 235.497 6,200 235,520 6,217 235.543 6,233 235,543 6,250 235,543 6,267 235.565 6,283 235.543 6,300 235.543 6,317 235.565 6,333 235,611 6,350 235 t 558 6,367 235^565 6,383 235.588 6,400 235,588 6,417 235,588 6,433 235,588 6,450 235,588 6,467 235.588 6,483 235e588 6,500 235,588 6,517 235.634 6,533 235,634 6,550 235,634 6,567 235,634 6,583 235,725 6,600 235,725 6,617 235,725 6,633 235,725 6,650 235,748 6,667 235,771 6,683 235,771 6.700 235,771 6,717 235,817 6,733 235,817 TIME DATE COMMENTS HR MIN 20 39 NOV 19,1974 DOWN DP 20 40 NOV 19, 1974 20 41 NOV 19, 1974 20 42 NOV 19,197^ 20 43 NOV 19,1974 20 44 NOV 19,1974 20 45 NOV 19, 1974 20 46 NOV 19,1974 20 47 NOV 19,1974 20 48 NOV 19,1974 20 49 NOV 19,1974 20 50 NOV 19,1974 20 51 NOV 19,1974 20 52 NOV 19,1974 END 5 G/M 20 53 NOV 19,1974 DOWN DP 20 54 NOV 19,1974 20 55 NOV 19,1974 20 56 NOV 19, 1974 20 57 NOV 19, 1974 20 58 NOV 19, 1974 20 59 NOV 19,1974 21 00 NOV 19, 1974 21 01 NOV 19,1974 21 02 NOV 19,1974 21 03 NOV 19,1974 START 10 G/M 21 04 NOV 19,1974 DOWN DP 21 05 NOV 19,1974 21 06 NOV 19,1974 21 07 NOV 19,1974 * 21 08 NOV 19, 1974 21 09 NOV 19,1974 . 21 10 NOV 19,1974 21 11 NOV 19, 1974 21 12 NOV 19, 1974 21 13 NOV 19,1974 21 14 NOV 19,1974 21 15 NOV 19,1974 21 16 NOV 19,1974 21 17 NOV 19, 1974 END 10 G/M 21 18 NOV 19,1974 DOWN DP " PAGE 5 I B-452 JOB NUMBER SPG-1 1210-0 ^ GAUGE/RUN NUMBER ' 204 RUN NO, 4 DST NO, 7 DATE OF JOtJ 11-19-7'; DATE OF RU ! 11-27-70 SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA PRESSURE TIME (PSI) 6 ,750 235,817 6 ,767 235,617 6 ,763 235,817 6 ,60 0 235,817 6 ,817 235.771 6, ,83?/ 235,771 6, ,850 235.771 6, ,867 235.617 6, , 8 8 3 235.817 6, ,90 0 235,840 6, ,917 235,840 6 ,933 235fi863 6, ,950 235.885 6 ,967 235,885 6 ,983 235,931 7, ,00 0 235,931 7 ,017 235,954 7 ,033 235e977 7 ,050 235,977 7, ,067 236,023 7, ,06? 236,046 7, ,100 236,046 7, ,117 236,068 7, ,133 236.068 7, ,150 236^068 7, 167 236,068 7, ,163 236,066 7, 200 236.114 7, ,217 236.046 7, ,233 236,046 7, ,250 2368046 7, ,267 236,091 7, ,28 3 236,046 7, ,30 0 236,023 7, ,317 236,091 7, ,333 236,U4 7, ,350 236,114 7, ,367 236,091 7( ,383 236,183 7 ,400 236,228 TIME DATE COMMENTS HR MIN 21 19 NOV 19,1974 21 20 NOV 19,1974 21 21 NOV 19,1974 21 22 NOV 19, 1974 21 23 NOV 19,1974 21 24 NOV 19,1974 21 25 NOV 19,1974 21 26 NOV 19,1974 21 27 NOV 19,1974 21 28 NOV 19,1974 START 20 G/M 21 29 NOV 19,1974 DOWN DP 21 30 NOV 19,1974 21 31 NOV 19,1974 21 32 NOV 19,1974 21 33 NOV 19,1974 21 34 NOV 19,1974 21 35 NOV 19, 1974 21 36 NOV 19,1974 2r 37 NOV 19,1974 21 38 NOV 19,1974 21 39 NOV 19,1974 21 40 NOV 19,1974 21 41 NOV 19,1974 21 42 NOV 19,1974 END 20 G/M 21 43 NOV 19,1974 DOWN DP 21 44 NOV 19,1974 21 45 NOV 19,1974 21 46 NOV 19,1974 21 47 NOV 19,1974 21 48 NOV 19,1974 21 49 NOV 19,1974 21 50 NOV 19, 1974 21 51 NOV 19, 1974 21 52 NOV 19,1974 21 53 NOV 19,1974 FILL DP 21 54 NOV 19,1974 21 55 NOV 19,1974 21 56 NOV 19,1974 21 57 NOV 19,1974 21 58 NOV 19, 1974 PAGE 6 II B-453 JOB NUMBER SPGM1210-D ^ GAUGE/RUN NUMBER ' 204 RUN NO, 4 DST NO, 7 DATE OF JO! 11-19-7C DATE OP RUM 11*27^7'; SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA PRESSURE TIME (PSI) 7,417 236, ,228 7,433 237. ,120 7,450 237. ,897 7,467 238. .331 7,463 238. 606 7.500 239, 040 7,517 239i 452 7,533 239, 680 7,550 239, 680 7,567 239, 474 7,583 239, 269 7,600 239, 063 7e6l7 238. ,812 7,633 238, .583 7.650 238, ,423 7,667 238, ,286 7,663 233, . i 49 7,700 238, ,034 7,717 239, ,663 7,733 242 ,012 7,750 243 ,864 7,767 245 .578 7,763 247 ,315 7,800 249 .007 7,817 250 ,630 7,833 251 i933 7,850 253 .262 7,867 254, J402 7,883 255, .499 7,900 256, 1414 7,917 257, ,397 7,933 258, , 197 7,950 258, ,059 7,967 257, ,145 7,963 256, ,002 8,000 254, ,813 8,017 253, ,670 8,033 252, ,573 8,050 251 ,522 8,067 250 ,516 •TIME DATE COMMENTS HR MIN 21 59 NOV 19,1974 22 00 NOV 19,1974 22 01 NOV 19,1974 22 02 NOV 19,1974 22 03 NOV 19, 1974 22 04 NOV 19, 1974 22 05 NOV 19,1974 22 06 NOV 19,1974 22 07 NOV 19,1974 DP FILLED 22 08 NOV 19,1974 22 09 NOV 19,1974 22 10 NOV 19,1974 22 11 NOV 19, 1974 22 12 NOV 19,1974 22 13 NOV 19,1974 22 14 NOV 19,1974 22 15 NOV 19,1974 22 16 NOV 19,1974 START 2/ G/M 22 17 NOV 19,1974 DOWN ANNULUS 22 18 NOV 19,1974 22 19 NOV 19, 1974 22 20 NOV 19,1974 22 21 NOV 19,1974 22 22 NOV 19,1974 22 23 NOV 19,1974 22 24 NOV 19,1974 22 25 NOV 19, 1974 22 26 NOV 19,1974 22 27 NOV 19,1974 22 28 NOV 19,1974 22 29 NOV 19, 1974 22 30 NOV 19,1974 END 20 G/M 22 31 NOV 19,1974 DOWN ANNULUS 22 32 NOV 19,1974 22 33 NOV 19,1974 22 34 NOV 19,1974 22 35 NOV 19,1974 22 36 NOV 19,1974 22 37 NOV 19,1974 22 38 NOV 19, 1974 • PAGE 7 II B-454 JOB NUMBER SPG-U210- D ^ GAUGE/RUN NUMBER W 204 RUN NO , 4 DST NO, 7 DATE OF JOR 11-19-7/; DATE OF RUf 11-27-74 SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA TIME 8,083 8,100 8,117 8,317 PRESSURE (PSI) 249,578 248?756 247,247 234c011 TIME HR MIN DATE COMMENTS 22 39 NOV 19,1974 22 40 NOV 19,1974 22 41 NOV 19,1974 22 53 NOV 19,1974 END TEST FINAL HYDRO, 244 POINTS REPORTED THIS RUN PAGE 8 H B-455 rJob"¥o ^SP6-n^)OuQ nate)\^fS-lLf RunPof I Customer VP t s? lt ^ Location_ State (Z-r>' "tt?r*Or> Well ~ C6i No. ("7 Office 'CA<> p- C -^6-H^V A'^^O-i 01 *:r-» 1 County/£axJr6h^_.,< cs iV^f-sp ^ Field USE MILITARY TIME FOR ALL TIMES Time Date Time Arrive: WelUDoek 1. .QkQQ 1H&-7V 2. Depart: Well/Ddfek 1.^300 W-^-l^ 2. Gauge Start in Hole 1. > /2 /? LLJ&lEL-2: Gauge Out of Hole 1 . *,fo!^XCJ> tlll2Sj!i 2» No. Trips 1 Miles V fT Date Time Charged Hrs. Hrs. Total Mileage O Top Gauge #_OOV Range_ • 700^ Element # "i;^ "/ ^ / ^Element # ZO'7c7 / Range lOOo • i Btm. Gauge # Type ToolcJ^w.'ns-ro'V ^v/£> Test Depth )~)\1 " lO'?l Zero Point £> Time Mode Time Mode / ;r? / ,'/ , r, ' '. ^-^ Packer Depth [Q]^ -5 Jail Pipe Depth ' "'-7 Top Gauge Depth 9"77, CC * Bottom Hole Temp._ O f Atmos. Temp. -£T^,5 Bottom Gauge Depth \QLlZ . OS TIME INFORMATION Time Date On Bottom ./^S //-/S-1L/ Packer Set . WZS-. i-jy-j //•/P,-7^ Initial Open . /V3^-.W7 //-/B'7L/ Initial Shut-In .}HL(S't^:!S U'l&'lV Start Flow .fe2S-./&V? II-/&-7*/ Final Shut-in .??*-/ h.?25/t //-/^'7Y Packer Unseated f^^6^ //'/.;WC/ v /3-5--CJ PRESSURE INFORMATION Initial Hydrostatic Mud Initial Draw Down Initial Build-Up Final Flow Final Build-Up Final Hydrostatic Mud Mud Weight TIME OF SURFACE NULLS Top Gauge ./Z/7 f ,iZl%:~-~> ) — .pio^ Bottom Gauge . //VS" A/W^./ff) — ja^ ./V- <9-7i/ Rema r k s / g - // ■ f - ^ £ •> ,f £« < c - . ~T^rY\ ES ^ ^V- S 7 ' ?^ ^ f r ^ cr rr &o-7f!£V SP-423 II B-456 ' Operator A/iT*-'*-^ Zs^rrririt *"/*. - W „•. /*>_ c y -. t > - ~ ^ ( • - ■ " ' 'i " IZZJ POST OFFICE BOX 36363 H O U STON, TE X AS 77036 (713) 494-3021 J. A. Fouche President December 24, 1974 Mr. Frederick R. Scheerer Atlantic-Richfield Company 1500 Security Life Building Denver, Colorado 80202 Dear Sir: DEC cj . 14 Enclosed is the original of data printout of our Precision Pressure Gauge Drill Stem Test Job SPG-11210-D performed on your Federal SG-1/ Well, Tract C-b, Piceance Creek Basin, Sorgmum Gulch, Rio Blanco County, Colorado on November 24, 1974. This report is being resubmitted to include all data points. Thank you for this opportunity to b.e of service. Very truly yours, SPERRY-SUN r,ni^ ) UkU^::-iifp Carl Kisinger,' Jr. Manager, Pressure Services CK:tk Enclosure ,' / i , ! yo/ / - /°j - ^ II B-457 JOB NUMBER 3PG-U2J0-D OATE OF JOE SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT PREPARED FOR ATLANTIC RICHFIELD COMPANY HELL NUMBER FEDERAL SG-17 FIELD/LEASE TRACT C-B SORGHUM GULCH COUNTY/PARISH RIO BLANCO STATE COLORADO TYPE OF TEST j DRILL STEM REFERENCE ELEV GROUND LEVEL ADDITIONAL INFORMATION USED GAUGE NO. 196 WITH 1000 LB, ELEMENT -r>AUGE DEPTH IS 1043,05 FEET INSIDE DP i GROUND LEVEL REFERENCE IS 7036 FEET INITIAL HYDROSTATIC IS 265,783 FINAL HYDROSTATIC IS 270.263 TEST INTERVAL IS FROM 1017 FEET (PACKER SET) TO 1067 FEET (TD) INSIDE DP II B-458 433 POINTS REPORTED THIS JOB PAGE 1 CF 12 PAGES JOB NUMBER SPG-112J0-D ^ GAUGE/RUN NUMBER 196 RUN NO, 4 OST NO DATE OF JOB H«19~74 DATE OF RUN 12*16-74 SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA PRESSURE TIME (PS1) 0e000 176.121 ,017 2003344 ,033 206,222 ,050 232,056 ,067 237.057 ,083 247^581 eioo 255,354 ,U7 2605545 el33 264,124 ,150 266.328 ,167 267.229 8163 268.035 ,200 268,532 ,217 268.864 ,233 268^12 ,250 269.149 ,267 269.149 ,283 269.267 ,300 269.291 .317 269.457 ,333 269.528 ,350 269.599 ,367 269.457 ,363 269.599 ,400 269^931 *417 269,789 ,433 269.789 ,450 269,836 ,467 269.978 ,463 269,978 ,500 269.765 ,517 269.765 ,533 270.097 ,550 270,120 ,567 269.789 ,563 269.836 ,600 269,812 ,617 270,144 ,633 270,120 ,650 270,239 TIME DATE COMMENTS HR MIN 15 28 NOV 19, 1974 FLOW TEST 15 29 NOV 19, 1974 IN DP 15 30 NOV 19, 197 4 15 31 NOV 19, 1974 15 32 NOV 19, 1974 15 33 NOV 19, 1974 15 34 NOV 19, 1974 15 35 NOV 19, 1974 15 36 NOV 19, 1974 15 37 NOV 19, 1974 15 38 NOV 19, 1974 15 39 NOV 19, 1974 15 40 NOV 19> 1974 15 41 NOV 19, 1974 15 42 NOV 19, 197*4 15 43 NOV 19, 197 4 15 44 NOV 19, 1974 15 45 NOV 19, 1974 15 46 NOV 19, 1974 15 47 NOV 19, 1974 15 48 NOV 19, 1974 15 49 NOV 19, 1974 15 50 NOV 19, 197 4 15 51 NOV 19, 1974 . - 15 52 NOV 19, 1974 15 53 NOV 19, 1974 15 54 NOV 19, 1974 15 55 NOV 19, 1974 15 56 NOV 19, 1974 15 57 NOV 19, 1974 15 58 NOV 19, 1974 15 59 NOV 19, 1974 16 00 NOV 19, 1974 16 01 NOV 19, 1974 16 02 NOV 19, 1974 16 03 NOV 19, 1974 16 04 NOV 19, 1974 16 05 NOV 19, 1974 16 06 NOV 19, 1974 16 07 NOV 19, 1974 PAGE 2 J I B-459 f JDS SPG' NUMBER •11210-D GAUGE/RUN NUMBER 196 RUN NO, 4 DST NO, 7 DATE OP JOB 11-19-74 DATE OF RUN 12-16-74 SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPCRT DELTA PRESSURE TIME (PSI) ,667 270,026 ,683 270,026 ,700 270.239 • 717 270,168 .733 270.144 ,750 270,405 e767 27 0,310 «783 270,381 ,800 270.310 ,817 270.239 ,633 270.381 ,850 270,500 ,867 270,310 ,863 270,428 ,900 270.571 ,917 270,428 ,933 270^310 ,950 270.357 ,967 270,452 ,983 270.381 1,000 270,310 1,017 270.286 1,033 270.405 1,050 270.594 1,067 270,452 1,063 270,547 1,100 270.452 1,117 270.500 1,133 270.523 1,150 270.428 1,167 270,594 1.183 270,547 1,200 270,669 1,217 270,547 1.233 270".689 1,250 270,689 1.267 270,571 1,263 270 J808 1,300 270,737 1,317 270,618 TIME DATE COMMENTS HR HIN 16 08 NOV 19, - 1974 16 09 NOV 19, » 1974 16 10 NOV 19, rl974 16 11 NOV 19, f 1974 16 12 NOV 19, r 1974 16 13 NOV 19, r 1974 16 14 NOV 19, . 1974 16 15 NOV 19, f 1974 16 16 NOV 19 » 1974 16 17 NOV 19 t 1974 16 18 NOV 19 r 1974 16 19 NOV 19 f 1974 16 20 NOV 19 r 1. 9 7 a 16 21 NOV 19 . 1974 16 22 NOV 19 t 1974 16 23 NOV 19 r 1974 16 24 NOV 19, r 1974 16 25 NOV 19 t 1974 16 26 NOV 19 . 1974 16 27 NOV 19, f 1974 16 28 NOV 19, - 1974 16 29 NOV 19, - 1974 16 30 NOV 19, » 1974 16 31 NOV 19, ■ 1974 16 32 NOV 19, . 1974 16 33 NOV 19, . 1974 16 34 NOV 19, r 1974 16 35 NOV 19, > 1974 16 36 NOV 19, r 1974 16 37 NOV 19, - 1974 16 38 NOV 19, r 1974 16 39 NOV 19, > 1974 16 40 NOV 19, r 1974 16 41 NOV 19, -1974 16 42 NOV 19, r 1974 16 43 NOV 19, - 1974 16 44 NOV 19, > 1974 16 45 NOV 19, -1974 16 46 NOV 19, 1974 16 47 NOV 19, 197 4 PAGE 3 II B-460 JOB SPG< NUMBER ■U210-D GAUGE/RUN NUMBER 196 RUN NCe 4 DST NO, DATE OF J06 11-19-74 DATE OF RUN 12-16-74 SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA TIME ,333 ,350 ,367 ,383 ,400 ,417 ,433 ,450 t467 ,483 .500 ,517 ,533 ,550 ,567 ,563 .600 ,617 .633 ,650 ,667 ,663 ,700 .717 ,733 ,750 .767 .783 ,800 ,817 ,833 ,850 ,867 .863 ,900 ,917 ,933 ,950 ,967 ,983 PRESSURE CPSI) 270,737 2705855 270,760 270.737 270.655 270,902 270.642 270.926 270.737 270.689 270.618 270.665 270.689 270.737 270.689 270,689 270,760 270.6^8 270.784 270.902 270.713 270.831 270,974 270.808 270.831 271,021 270.974 270.879 270.631 271.021 270,855 631 270 270 270 271 270 270 270 270 .831 .737 ;021 ,974 ,879 ,879 j879 270,808 TIME DATE COMMENTS HR MIN 16 48 NCV 19, 1974 END RECOVERY 16 49 NOV 19, 1974 16 50 NOV 19, 1974 16 51 NCV 19, 1974 16 52 NCV 19, 1974 16 53 NOV 19, '1974 16 54 NOV 19, 1974 16 55 NCV 19, 1974 16 56 NOV 19, 1974 16 57 NOV 19, 1974 16 58 NCV 19/ . 1974 16 59 NCV 19, - 1974 17 00 NOV 19, > 1974 17 01 NOV 19, f 1974 17 02 NOV 19, f 1974 17 03 NOV 19, r 1974 ' 17 04 NCV 19, r 1974 17 05 NOV 19 r 1974 17 06 NOV 19 r 1974 < 17 07 NOV 19 r 1974 17 08 NCV 19 r 1974 17 09 NOV 19 t 1974 17 10 NOV 19 rl974 17 11 NOV 19 r 1974 17 12 NOV 19 r 1974 17 13 NOV 19 r 1974 17 14 NOV 19 p 1974 17 15 NCV 19 f 1974 17 16 NOV 19 t 1974 * 17 17 NOV 19 r 1974 17 18 NOV 19 r 1974 ' 17 19 NOV 19 r 1974 17 20 NCV 19 ? 1974 17 21 NOV 19 f 1974 17 22 NOV 19 t 1974 17 23 NOV 19 r 1974 17 24 NOV 19 t 1974 17 25 NOV 19 r 1974 17 26 NOV 19 f 1974 17 27 NOV 19 rl974 PAGE 4 II B-461 p JOB NUMBER SPGM121Q-D GAUGE/RUN NUMBER 196 RUN NO, 4 DST NO, DATE OF JOB li«»l9-74 DATE OF RUN 12-16-74 SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA TIME 2S000 2,017 2,033 2,050 2,067 2,083 2,100 2,117 2,133 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 PRESSURE (PSI) ,150 ,167 ,163 .200 .217 • 233 ,250 ,267 ,263 ,30 0 ,317 ,333 ,350 ,367 ,363 ,400 ,417 ,433 ,450 ,467 ,463 ,500 ,517 • 533 ,550 ,567 ,583 ,600 .617 ,633 ,650 271 271 270 270 270 270 270 271 271 271 271 271 270 021 045 679 926 ,974 926 ,997 .163 021 092 066 ,021 974 270:974 27U021 271 271 271 271 271 271 271 271 271 271 271 271 271 271 271 271 271 271 271 271 271 271 271 021 116 163 092 066 167 021 068 045 139 163 163 116 116 187 282 353 256 756 353 706 305 945 271,282 271,969 TIME DATE COMMENTS HR WIN 17 28 NOV 19, -1974 17 29 Noy 19, -1974 17 30 NOV 19, -1974 17 31 NOV 19, -1974 17 32 NOV 19, -1974 17 33 NOV 19, . 1974 17 34 NOV 19, -1974 17 35 NOV 19, - 1974 17 36 NOV 19, .1974 17 37 NOV 19, - 1974 17 38 NOV 19, -1974 17 39 NOV 19, . 1974 17 40 NOV 1 9, - 1974 17 41' NOV 19, . 1974 17 42 NOV 19, .19 7 4 17 43 NOV 19, . 1974 17 44 NOV 19, . 1974 17 45 NOV 19, - 1974 17 46 NOV 19, , 1974 17 47 NOV 19, t 1974 17 48 NOV 19, f 1974 17 49 NOV 19, r 1974 17 50 NOV 19 , 1 9 7 4 17 51 NOV 19, r 1974 17 52 NOV 19 r 1974 17 53 NOV 19 f 1 9 7 4 17 54 NOV 19 r 1974 17 55 NOV 19 f 1974 17 56 NOV 19 t 1974 17 57 NOV 19 t 1974 17 58 NOV 19, » 1974 17 59 NOV 19, . 1974 18 00 NOV 19, . 1974 18 01 NOV 19, r 1974 18 02 NOV 19, . 1974 18 03 NOV 19, . 1974 18 04 NOV 19, t 1974 18 05 NOV 19, , 1974 18 06 NOV 19 r 1974 18 07 NOV 19 f 1974 PAGE 5 II B-462 » JOB NUMBER SPG-11210-D GAUGE/RUN NUMBER ^ 196 RUN NO, U DST NOs 7 DATE OF JOB 1 l-l9-7a OATE OF RUN 12-16-74 SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA TIME 2e667 2,663 2e700 2,717 ,733 ,750 ,767 ,783 ,800 ,817 ,833 .850 ,867 .883 ,900 ,917 «^3 .950 ,967 ,963 ,000 ,017 ,033 ,050 ,067 ,063 ,100 «H7 .133 ,150 ,167 ,163 ,200 ,217 ,233 ,250 ,267 ,263 ,300 .317 PRESSURE CPSI) 271,305 271.898 271. 542 271.471 271.945 271.637 271.732 271.424 271.708 272.870 271.614 271.637 271.922 271.542 271 .424 271 271 261 255 238 242 242 242 242 241 242 241 542 651 734 876 740 034 627 414 177 963 129 963 241.679 241.418 241.371 24U229 241,323 24K276 241.205 241,181 241.442 2413063 241,039 240^992 241,015 TIME DATE COMMENTS HR MIN 18 08 NOV 19 ,1974 18 09 NOV 19 .1974 18 10 NOV 19 f 1974 18 11 NOV 19 t 1974 18 12 NOV 19 r 1974 18 13 NOV 19 f 1974 18 14 NOV 19 t 1974 18 15 NOV 19 r 1974 18 16 NOV 19 r 1974 18 17 NOV 19 f 1974 18 18 NOV 19 f 1974 18 19 NOV 19, > 1974 18 20 NOV 19, f 1974 18 21 NOV 19, » 1974 18 22 NOV 19, p 1974 18 23 NOV 19, * 1974 18 24 NOV 19, f 1974 START AIR JET 18 25 NOV 19, - 1974 INSIDE DP 18 26 NOV 19, - 1974 18 27 NOV 19, - 1974 18 28 NOV 19, - 1974 18 29 NOV 19, t 1974 18 30 NOV 19, » 1974 18 31 NOV 19, r 1974 18 32 NOV 19, f 1974 18 33 NOV 19, > 1974 18 34 NOV 19, - 1974 18 35 NOV 19, t 1974 18 36 NOV 19, » 1974 18 37 NOV 19, - 1974 * 18 38 NOV 19, - 1974 18 39 NOV 19, t 1974 18 40 NOV 19, t 1974 18 41 NOV 19, » 1974 18 42 NOV 19, - 1974 18 43 NOV 19, t 1974 18 44 NOV 19, 1974 16 45 NOV 19, 1974 18 46 NOV 19, 1974 18 47 NOV 1 9 i 1974 PAGE 6 IT B-463 f JOB SPG- NUMBER 11210-D GAUGE/RUN NUMBER 196 RUN NO, 4 DST NO, 7 SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DATE OF JOB U-I9«7a DATE OF RUN 12-16-74 DELTA PRESSURE TIME (psn 3f ,333 240,897 3, ,350 240^920 3, ,367 240,826 3, ,383 240.826 3, ,400 240,731 3, ,417 240,660 3, ,433 240.565 3, ,450 240,802 3, ,467 240.565 3, ,463 240.683 3, ,500 240.589 3, ,517 240,541 3, ,533 240,565 3, .550 240,541 3, ,567 240.612 3, .563 240.778 3, ,600 240,636 3, .617 240J6B6 3, ,633 240,257 3. ,650 240.873 3, ,667 240,541 3, tbb3 240.399 3, ,700 240,233 3, ,717 240,589 3, .733 240,423 3 ,750 240,233 3 ,767 240.518 3 .763 240,352 3 ,800 240.423 3 ,817 240.423 3 .833 240.399 3 ,850 240,399 3 ,867 240,281 3 ,883 240,233 3 ,900 240,304 3 ,917 220.656 3 ,933 244,357 3 ,950 246.988 3 ,967 255,473 3 s963 260,758 TIME DATE COMMENTS HR MIN 18 48 NOV 19, 1974 16 49 NOV 19, -1974 18 50 NOV 19, 1974 18 51 NOV 19, . 1974 18 52 NOV 19, f 1974 18 53 NOV 19, - 1974 18 54 NOV 19, -1974 18 55 NOV 19, - 1974 16 56 NOV 19, - 1974 18 57 NOV 19, - 1974 18 58 NOV 19, - 1974 18 59 NOV 19, - 1974 19 00 NOV 19 - 1974 19 01 NOV 19, -1974 19 02 NOV 19 r 1974 19 03 NOV 19 f 197^ 19 04 NOV 19 -1974 19 05 NOV 19 - 1974 19 06 NOV 19, - 1974 ? 19 07 NOV 19, - 1974 19 08 NOV 19, i 1974 19 09 NOV 19, -1974 19 10 NOV 19, - 1974 19 11 NOV 19, - 1974 19 12 NOV 19, - 1974 19 13 NOV 19, - 1974 19 14 NOV 19, - 1974 19 15 NOV 19 - 1974 19 16 NOV 19, - 1974 19 17 NOV 19, - 1974 19 18 NOV 19, -1974 19 19 NOV 19, - 1974 19 20 NOV 19 - 1974 19 21 NOV 19 - 1974 19 22 NOV 19 - 1974 END AIR JET 19 23 NOV 19 - 1974 INSIDE DP 19 24 NOV 19, - 1974 19 25 NOV 19, f 1974 19 26 NOV 19, - 1974 19 27 NOV 19, -1974 PAGE 7 II B-464 JOB 8PG' NUMBER • U210-D GAUGE/RUN NUMBER 196 RUN NOe 4 DST NO, 7 DATE OF JOB il-19-74 DATE OF RUN 12-16-74 SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPCRT DELTA PRESSURE TIME (PSI) 4, 000 264,005 «, 017 265e783 4, 033 266,650 4, 050 267,324 1i 067 267,063 4i 063 268.082 4, 100 2681319 4, 117 268^722 4, 133 269el01 «, 150 269.220 4, 167 269,030 4, 163 268,722 a, 200 269.338 4, 217 269. 409 4, 233 269.362 4, ,250 269.149 ,267 269.646 4, ,263 269.504 ^, ,300 269.528 4, ,317 269.670 4, ,333 269.623 a, ,350 269.883 4, ,367 269.599 4. ,363 270.073 4, ,400 269.907 4, ,417 270.002 a, .433 269,954 ^, ,450 270.168 ^, ,467 270.263 4, ,463 270.361 a, ,500 270,286 4, ,517 270,428 a, ,533 270".500 a .550 2701452 a ,567 270,357 ^ ,563 270,760 4 ,600 270*689 a ,617 270*.618 a ,633 270,713 4 ,650 270,594 TIME DATE COMMENTS HR MIN 19 28 NOV 19, rl974 19 29 NOV 19* 1974 19 30 NOV 19, 1974 19 31 NOV 19, 1974 19 32 NOV 19, 1974 19 33 NOV 19, -1974 19 34 NOV 19, 1974 19 35 NOV 19, 1974 19 36 NOV 19, 1974 if; 37 NOV 19, - 1974 19 38 NOV 19, r 1974 19 39 NOV 19., - 1974 19 40 NOV 19, > 1974 19 41 NOV 19, » 1974 19 42 NOV 19, r 197 4 19 43 NOV 19, » 1974 19 44 NOV 19, , 1974 19 45 NOV 19, - 1974 19 46 NOV 19 > 1974 19 47 NOV 19, f 1974 19 48 NOV 19, r 1974 19 49 NOV 19, t 1974 19 50 NOV 19, - 1974 19 51 NOV 19, p 1974 19 52 NOV 19, p 1974 19 53 NOV 19, r 1974 19 54 NOV 19, p 1974 19 55 NOV 19, p 1974 19 56 NOV 19, p 1974 19 57 NOV 19, r 1974 19 58 NOV 19, » 1974 19 59 NOV 19, p 1974 20 00 NOV 19 r 1974 20 01 NOV 19 p 1974 20 02 NOV 19 f 1974 20 03 NOV 19 r 1974 20 04 NOV 1^ p 1974 20 05 NOV 19 p 1974 20 06 NOV 19 p 1974 ■ 20 07 NOV 19 p1974 PAGE 8 1 I B-465 JOB SPG' NUMBER ■1 1210-D GAUGE/RUN NUMBER ^ 196 RUN NO, 4 DST NO. 7 DATE OF JOB 11-19-74 DATE OF RUN 12-16-7^ SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA PRESSURE TIME (PSI) lU ,667 270,713 4, ,683 270,737 4, ,700 270.713 4, ,717 270,655 4, ,733 270.713 4, ,750 270,879 4, ,767 270.902 4, .783 270.926 4, ,800 270.997 4, ,817 271.092 4. ,833 270.950 4, ,850 270.997 a, ,867 270,902 a, ,663 .270.950 4, ,900 270.902 A, ,917 271.116 4, = 933 2 7 0,907 271.139 4, ,950 a, ,967 271.187 4, ,963 271.187 5, ,000 271 .234 5, ,017 271.353 5, ,033 271.139 5, ,050 271.163 5, ,0b7 271,139 5, ,063 271.187 5 .100 271,258 5, .117 271.23a 5 ,133 27i;2ll 5, ,150 271,400 5, , 14>7 271-329 5 ,163 274,552 5 ,200 276.330 5, ,217 277^563 5, .233 278*,771 5, ,250 279,316 5 ,267 279,719 5 ,263 280*170 5 ,300 280.478 5 ,317 280,549 TIME IR MIN DATE COMMENTS 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 NOV 19,1 NOV 19,1 NOV 19, 1 NOV 19, 1 NOV 19, 1 NOV 19, 1 NOV 19,1 NOV 19, 1 NOV 19, 1 NOV 19, 1 NOV 19, 1 NOV 19, 1 NOV 19, 1 NOV 19, 1 NOV 19, 1 NOV 19, 1 NOV 19,1 NOV 19,1 NOV 19, 1 NOV 19,1 NOV 19, 1 NOV 19, 1 NOV 19,1 NOV 19,1 NOV 19, 1 NOV 19, 1 NOV 19,1 NOV 19, 1 NOV 19, 1 NOV 19, 1 NOV 19, 1 NOV 19, 1 NOV 19, 1 NOV 19, 1 NOV 19, 1 NOV 19, 1 NOV 19, 1 NOV 19, 1 NOV 19, 1 NOV 19, 1 974 974 974 974 974 974 974 974 974 974 974 97 4 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 S1ART 5 DOWN DP G/M PAGE 9 II B-466 JOB NUMBER SPG-U210-D GAUGE/RUN NUMBER 1 196 RUN NO, 4 DST NO, 7 DATE OF JOB 11-IW4 DATE OF RUN 12=16-74 SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA PRESSURE TIME cpsx) 5,333 280,715 5,350 280,762 5,367 280^999 5,363 281,047 5,400 281.118 5,417 280,027 5. 433 277.017 5.450 275.263 5,467 273,984 5.483 273.249 5,500 272.941 5,517 272,609 5,533 272.656 5.550 272,348 5,5o7 272,348 5.563 274,671 5,600 279.17a 5,617 283.440 5,633 286. 048 5.650 287,920 5.667 289Ve034 5.663 289.935 5.700 290.717 5.717 291.096 5,733 291.783 5.750 292,068 5,767 2921660 5,783 293e134 5.800 293.845 5.817 294.367 5,833 293.419 5,650 287,138 5,867 282,208 5,883 279,103 5e900 276.604 5,917 275,263 5,933 274,458 5,950 274.197 5,967 273?604 5,983 273*462 TIME HR MIN 20 48 NOV 20 49 NOV 20 50 NOV 20 51 NOV 20 52 NOV 20 53 NOV 20 54 NOV 20 55 NOV 20 56 NOV 20 57 NOV 20 58 NOV 20 59 NOV 21 00 NOV 21 01 NOV 21 02 NOV 21 03 NOV 21 04 NOV 21 05 NOV 21 06 NOV 21 07 NOV 21 08 NOV 21 09 NOV 21 10 NOV 21 11 NOV 21 12 NOV 21 13 NOV 21 14 NOV 21 15 NOV 21 16 NOV 21 17 NOV 21 18 NOV 21 19 NOV 21 20 NOV 21 21 NOV 21 22 NOV 21 23 NOV 21 24 NOV 21 25 NOV 21 26 NOV 21 27 NOV DATE 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 COMMENTS 974 974 974 974 974 974 974 974 97 4 974 974 974 974 97 4 9 7*4 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 97 4 974 974 974 974 974 974 END DP 5 G/M DOWN START 10 DOWN DP G/M END 10 G/M DOWN DP PAGE 10 1] H-467 JOB NUMBER SI G-U210-0 CAUGE/RUN NUMBER J96 RUN NO, 4 DST NO DATE OF JO: DATE OF RUf 12*16-7^ SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPGRT DELTA PRESSURE TIME cpsn 6, ,000 275s643 6, ,017 2893540 6, ,033 298.420 6, ,050 306^265 k< ,067 313.114 6. ,053 317,655 6, ,100 3223571 6, ,117 325.771 6. ,133 329,871 6, ,150 333,639 6. .167 336.365 6, i 163 339*944 6. ,200 344:708 6. ,217 350.064 6, ,233 354.899 6. ,250 349*567 6, .267 335.867 6. ,263 323.709 6, ,300 313.517 6, ,317 305.340 6, 333 297.377 6, ,350 291.973 6, ,367 287,493 6, ,363 283,962 6, ,400 281,189 6. ,417 307.853 6, ,433 315,508 6. ,450 366.086 6, ,467 367.935 6, ,463 384.431 6. ,500 421.191 6, ,517 427.548 6, ,533 439.646 6, ,550 444.065 6, ,567 446,428 6, .563 448.910 6 ,600 451 .060 6, ,617 452,927 6 ,633 454.226 6, .650 455,030 TIME DATE COMMENTS HR MIN 21 28 NOV 1 I9f 1974 START 20 G/M 21 29 NOV 1 19, 1974 DOWN DP 21 30 NOV \ 19, 1974 21 31 NOV ] 19, 1974 21 32 NOV 1 L9, 1974 21 33 NOV ] 19, 1974 21 34 NOV ! 19, 1974 21 35 NOV 3 [9, 1974 21 36 NOV 1 L9, 1974 21 37 nov : 19/ 1974 21 38 NOV 19, 1974 21 39 NOV L9, 1974 21 40 nov : 19, 1974 21 41 NOV ! L9, 1974 21 42 nov : 19, 1974 END 20 G/M 21 43 nov : 19, 1974 DOWN DP 21 44 ncv : L9, 1974 21 45 NCV ! 19, 1974 2.1 46 NOV 1 19, 1974 21 47 NOV ] L9, 1974 21 48 NOV ! 19, 1974 21 49 NGV ! 19, 1974 21 50 NOV ! 19, 1974 21 51 NOV 1 19, 1974 21 52 NOV ] 19, 1974 21 53 NOV ! 19, 1974 FILL DP 21 54 NOV 1 19, 1974 21 55 NOV ] 19, 1974 21 56 NOV : 19, 1974 21 57 nov : 19, 1974 . 21 58 nov : 19, 1974 21 59 nov : 19, 1974 22 00 nov : 19, 1974 ZZ 01 NOV 1 19, 1974 22 02 NOV ! 19, 1974 22 03 nov : 19, 1974 22 04 ncv : 19, 1974 ZZ 05 NOV ! 19, 1974 ZZ 06 nov : 19, 1974 22 07 NOV 1 L9, 1974 DP FILLED PAGE 11 II B-468 JOB NUMBER SPG-i 121 0-D v GAUGE/RUN NUMBER 196 RUN NOe 4 DST NO, 7 DATE OF JC 11-19-7 DATE OF RU 12-16-7 SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPGRT DELTA TIME ,667 .683 • 700 .717 e733 ,.750 • 767 f763 ,600 ,617 .833 .850 ,867 ,663 .900 ,917 ,933 .950 ,967 .963 i 000 .017 ,033 ,050 .067 ,063 ,100 .117 ,133 .150 ,167 ,200 .217 PRESSURE CPSI) 435,606 417.068 399.884 3833957 369,499 356*796 3442542 334.422 324.372 TIME HR MIN DATE COMMENTS 318 311 304 298 293 289 234 313 795 372 442 792 286.308 283.359 281 280 279 278 277 687 075 245 013 752 277.207 276,675 276.543 276.235 276.212 276.046 275.609 275.714 275.6f/0 275.548 275,477 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 40 41 NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV ■ NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 974 INJECT 20 G/M DOWN ANNULUS END 20 G/M DOWN ANNULUS END TEST 433 POINTS REPORTED THIS RUN PAGE 12 1 I B 169 JOB NUMBER 3PG»H2tO-D DATE OF JC; 1 1-19-7 SPERRY^SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT PREPARED FOR ATLANTIC RICHFIELD COMPANY WELL NUMBER FEDERAL SG-17 FIELD/LEASE TRACT C-B SORGHUM GULCH COUNTY/PARISH RIO BLANCO STATE COLORADO TYPE OF TEST DRILL STEM REFERENCE ELEV GROUND LEVEL ADDITIONAL INFORMATION USED GAUGE NO, 204 WITH 1000 LB, ELEMENT GAUGE DEPTH IS 977.^6 FEET OUTSIDE DP - IN ANNULUS ABOVE PACKER INITIAL HYDROSTATIC IS 229,94 FINAL HYDROSTATIC IS 234,01 TEST INTERVAL IS SURFACE TO 1017 FEET (PACKER DEPTH) * II B-470 33 POINTS REPORTED THIS JOB PAGE 1 OF 2 PAGES i JOB SPG. NUMBER ■1 1 210-D GAUGE/RUN NUMBER 204 RUN NO, 4 DST NO, 7 DATE OF JO: 11-19-7; OATE OF RU; 12-16-7' SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA TIME 05000 ,017 ,033 e050 ,067 ,063 ,100 .117 ,1^3 • 1^0 ,167 ,163 ,200 ,217 |233 ,250 ,267 .263 ,300 .317 «333 ,350 ,367 .363 ,400 .417 .433 ,450 ,467 .463 ,500 ,517 ,533 PRESSURE CPSI) 232*411 232.617 232,731 232,799 232.868 232,959 233.028 233 233 233 074 142 233,142 233,165 233,188 233,211 233,234 233.234 233.234 233.357 233.257 233.257 233,257 233.279 233,279 233.302 233,302 233,302 233.325 233.325 233.325 233,348 233.348 233,3^6 233,348 TIME DATE COMMENTS HR MIN 14 46 NOV 19,1974 CLOSE TOOL 14 47 NOV 19,1974 START INITIAL 14 48 NOV 19,1974 SHUT-IN 14 49 NOV 19,1974 14 50 NOV 19, 1974 14 51 NOV 19,1974 14 52 NOV 19,1974 14 53 NOV 19, 1974 14 54 NOV 19, 1974 14 55 NOV 19,1974 14 56 NOV 19,1974 14 57 NOV 19,1974 14 58 NOV 19,1974 14 59 NOV 19,1974 15 00 NOV 19, 1974 15 01 NOV 19,1974 ' 15 02 NOV 19, 1974 15 03 NOV 19,1974 15 04 NOV 19, 1974 i 15 05 .NOV 19,1974 15 06 NOV 19, 1974 15 07 NOV 19,1974 15 08 NOV 19,1974 15 09 NOV 19, 1974 15 10 NOV 19,1974 15 11 NOV 19, 1974 15 12 NOV 19,1974 15 13 NOV 19,1974 15 14 NOV 19,1974 15 15 NOV 19,1974 15 16 NOV 19, 1974 15 17 NOV 19,1974 15 18 NOV 19,1974 END SHUT-IN 33 POINTS REPORTED THIS RUN PAGE 2 II K-471 JOB NUMBER SPG-U21C»D OATE OF JOE NOVEMBER lef 197' SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT PREPARED FOR ATLANTIC RICHFIELD COMPANY HELL NUMBER FEDERAL SG-17 FIELD/LEASE TRACT C-B SORGHUM GULCH COUNTY/PARISH RIO BLANCO STATE COLORADO TYPE OF TEST DRILL STEM REFERENCE ELEV GROUND LEVEL ADDITIONAL INFORMATION USED GAUGE NO, 204 WITH 1000 LB, ELEMENT GAUGE DEPTH IS 977,66 FEET OUTSIDE DP - IN ANNULUS ABOVE PACKER GROUND LEVEL REFERENCE IS 7036 FEET INITIAL HYDROSTATIC IS 229, 94 FINAL HYDROSTATIC IS 234,01 TEST INTERVAL IS SURFACE TO 1017 FEET (PACKER DEPTH) II B-472 434 POINTS REPORTED THIS JOB PAGE 1 OF 12 PAGES JOB NUMBER SPG-U210-D GAUGE/RUN NUMBER 204 RUN NOe 4 DST N06 7 OATE OF JC NOVEMBER lt, 197 DATE OF RU DECEMBER 16, 197 SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA TIME 0e000 8017 033 050 067 083 100 117 133 150 167 163 200 217 233 250 267 263 300 317 333 350 367 363 400 417 433 450 467 463 500 517 533 550 567 563 600 617 633 650 PRESSURE (PSI) 233,531 233,645 233,645 233.600 233.600 233 233 233 233 233 233 600 577 577 600 600 600 233.622 233,622 2333622 233. 645 233.666 233.668 233,668 233.668 233.691 233.737 233,714 2331691 233.714 233.714 233.737 233.714 233,737 233.760 233.760 233.760 233.760 233.760 233,760 233.805 233,805 233.828 2331828 233.628 233.828 TIME DATE COMMENTS HR MIN 15 28 NOV 19, - 1974 START FICVi 15 29 NOV 19, -1974 INSIDE DP 15 30 NOV 19, r 1974 15 31 NOV 19, - 1974 15 32 NOV 19, -1974 15 33 NOV 19, . 1974 15 34 NOV 19, i 1974 15 35 NOV 19, - 1974 15 36 NOV 19, . 1974 15 37 NOV 19, I 1974 15 38 NOV 19, - 1974 15 39 NOV 19, - 1974 15 40 NOV 19, t 1 9 7 4 15 41 NOV 19, 1974 15 42 NOV 19, . 1^74 15 43 NOV 19, , 197« 15 44 NOV 19, t 1974 15 45 NOV 19 , 1974 15 46 NOV 19 f 1974 i5 47 NOV 19, r 1974 15 48 NOV 19 > 1974 15 49 NOV 19 r 1974 15 50 NOV 19 , 1974 15 51 NOV 19, f 1974 15 52 NOV 19, r 1974 15 53 NOV 19, r 1974 15 54 NOV 19, r 1974 15 55 NOV 19, - 1974 15 56 NOV 19, - 1974 15 57 NOV 19, r 1974 . 15 58 NOV 19, r 1974 15 59 NOV 19, - 1974 16 00 NOV 19, , 1974 16 01 NOV 19, r 1974 16 02 NOV 19, t 1974 16 03 NOV 19, t 1974 16 04 NOV 19, r 1974 16 05 NOV 19, f 1974 16 06 NOV 19, r 1974 16 07 NOV 19, r 1974 PAGE II B-473 JOB NUMBER SPG-11210-D GAUGE/RUN NUMBER 204 RUN NQ9 4 DST NO, DATE OF JC NOVEMBER 1,, 197 DATE OF RU DECEMBER 16, 197 SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA TIME ct67 ,683 ,700 .717 • 733 ,750 ,767 ,783 ,800 ,817 ,633 ,850 ,867 ,883 ,900 e9l7 ,933 ,950 ,967 ,983 ,000 .017 ,033 ,050 ,067 ,083 ,100 .117 .133 .150 ,167 ,163 .200 ,217 ,233 ,250 ,267 ,263 ,300 ,317 PRESSURE cpsn 2333628 233,628 233,874 233,87a 233.87a 233.87a 233.697 233.920 233.920 .920 5920 f9a2 ,9a2 .942 .942 .965 .965 .965 TIME HR MIN DATE COMMENTS 233 233 233 233 233 233 233 233 233 233.965 233 233 233 23a 23a 23a 23a 23a 23a 23a 23a 23a 23a 23a 23a 23a 23a 23a 23a 23a 23a 988 988 988 Oil Oil Oil 03a 03a 057 057 057 057 102 102 102 102 102 102 102 125 las 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 08 09 10 11 12 13 ia 15 16 17 18 19 20 Z\ 22 23 2a 25 26 27 28 29 30 31 32 33 3a 35 36 37 38 39 ao ai a2 a3 a5 46 a7 NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV NOV 19 19 19 19 19 19 19 19 19 19 19 19 1^9 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 197a 197a 197a 197a 197a 197a 197a 197a 197a 197a 197a 197a 1974 1974 1 97 a 197a 197a 197a 197a 197a 197a 197a 197a 197a 197a 197a 197a 197a 197a 197a 197a 197a 197a 197a 197a 197a 197a 197 a 197a 197a PAGE R-474 JOB NUMBER SPG-U21Q-D GAUGE/RUN NUMBER 204 RUN NO, 4 DST NO, DATE OF JC NOVEMBER lt, 197 DATE OF RU DECEMBER 16, 197 SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPCRT DELTA PRESSURE TIME (PSI) 1,333 234-148 1,350 234^148 1,367 234a148 1,363 234.171 1 ,400 234,171 1,417 234,171 1,433 234.J71 1?450 234,171 1 ,467 234.171 1,483 234.171 1,500 234.194 1,517 234,217 1,533 234.217 1,550 234.217 1,567 234,217 1,583 234,217 1,600 234,240 1,617 234. > ,463 236.183 6, ,50 0 236.228 t>, ,517 236,228 6, ,533 237,120 6, ,550 237.897 6, ,567 238.331 6, ,563 238,606 b, ,600 239,040 6. ,617 239,452 6, .633 239.680 6, .650 239J680 TIME DATE COMMENTS HR MIN 21 28 NOV 19, ,1974 START 20 GPM 21 29 NOV 19, ,1974 DOWN DP 21 30 NOV 19, f 1974 21 31 NOV 19, ,1974 21 32 NOV 19, r 1974 21 33 NOV 19, , 1974 21 34 NOV 19, ,1974 21 35 NOV 19, ,1974 21 36 NOV 19, -1974 21 37 NOV 19, ,1974 21 38 NOV 19, » 1974 21 39 NOV 19, r 1974 21 40 NOV 19, f 1974 21 41 NOV 19, 1974 21 42 NOV 19, ,19*7 4 END 20 GPM 21 43 NOV 19, , 1974 DOWN DP 21 44 NOV 19, ,1974 21 45 NOV 19, ,1974 21 46 NOV 19, , 1974 21 47 NOV 19, f 1974 21 48 NOV 19, t 1974 21 49 NOV 19, »1974 21 50 NOV 19, , 1974 21 51 NOV 19, , 1974 21 52 NOV 19, t 1974 21 53 NOV 19, r 197a FILL PIPE 21 54 NOV 19, r 1974 21 55 NOV 19, r 1974 21 56 NOV 19, , 1974 21 57 NOV 19, ,1974 21 58 NOV 19, ,1974 21 59 NOV 19, 1974 22 00 NOV 19, ,1974 22 01 NOV 19, 1974 22 02 NOV 19, ,1974 22 03 NOV 19, -1974 22 04 NOV 19, , 1974 22 05 NOV 19, • 1974 22 06 NOV 19, -1974 22 07 NOV 19, 1974 DP FILLED PAGE 11 II B-482 I JOB NUMBER SPG-U210-D GAUGE/RUN NUMBER 204 RUN NO, 4 DST NO, 7 DATE NOVEMBER 1., OF JC 197 DATE OF RL DECEMBER 16, 197 SPERRY-SUN PRECISION SUBSURFACE PRESSURE GAUGE REPORT DELTA TIME 6*667 6,683 6.700 6,717 6,733 6,750 6,767 6,783 6,800 6,617 6,833 6,850 6.667 6,683 6,900 6,917 to. 933 6,950 6,967 6.963 7,000 7.017 7,033 7.050 067 063 7,100 7,117 7.133 7.150 7,167 7,163 7,200 7,217 7, 7. PRESSURE (PSI) 239,474 239,269 239.063 238,812 238,583 238,423 236,286 238.149 ,034 s663 -012 238 239 242 243 245 247 864 578 315 249,007 250,630 251 253 254 255 256 257 258 258 257 256 254 1-P3 282 402 499 414 397 197 059 145 002 613 253.670 252-573 25U522 250* 51 6 24 9,57 8 248*,756 247,247 TIME DATE COMMENTS HR MIN 22 08 NOV 19, -1974 22 09 NOV 19, - 1974 22 10 NOV 19, -19 74 22 11 NOV 19, . 1974 22 12 NOV 19, -1974 22 13 NOV 19, - 1974 22 14 NOV 19, . 1974 22 15 NOV 19, ' 1974 22 16 NOV 19, } 1^74 START 20 GPM 22 17 NOV 19, t 1974 DOWN ANNULUS 22 18 NOV 19, r 1974 22 19 NOV 19, r 1974 22 20 NGV 19, - 1974 22 ^l NOV 19, -1974 *■ 22 22 NOV 19, r 1974 22 23 NOV 19, 1974 22 24 NOV 19, 1974 22 25 NOV 19, ' 1974 i 22 26 -NOV 19, r 1974 22 27 NOV 19, r 1974 22 28 NOV 19, r 1974 22 29 NOV 19, r 1974 22 30 NOV 19, f 1974 END 20 GPM 22 31 NOV 19, f 1974 DOWN ANNULUS 22 32 NOV 19, r 1974 22 33 NOV 19, r 1974 22 34 NOV 19, r 1974 22 35 NOV 19, - 1974 22 36 NOV 19, r 1974 22 37 NOV 19, r 1974 22 38 NOV 19, - 1974 22 39 NOV 19, - 1974 22 40 NOV 19, t 1974 22 41 NOV 19, t 1974 END TEST 434 POINTS REPORTED THIS RUN PAGE 12 I I B-485